conditionally permit two fast food drive-thru restaurants and a self-storage facility, located within the General Commercial (GC) land use designation of the East Chino Specific Plan (ECSP) within the Mixed Use Overlay (MUO) district, located on the north side of Schaefer Avenue between Euclid Avenue and Fern Avenue (APN: 1052-581-03); and WHEREAS, the Applicant filed a preliminary application with the City on December 20,2024; and
WHEREAS, in compliance with the California Environmental Quality Act (CEQA), an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, dated April 11, 2025, has been prepared by Applied Planning, Inc.; and
WHEREAS, the Planning Commission of the City of Chino has completed its study of the proposed Project; and
WHEREAS, on May 21, 2025, the Planning Commission held a duly noticed public hearing for the Project in compliance with law, including compliance with the relevant provisions of the California Government Code and Chino Municipal Code, entertained the written and oral report of staff, and took public testimony on the Project.
NOW, THEREFORE, the Planning Commission of the City of Chino, California, does hereby FIND, DETERMINE, and RESOLVE as follows:
A. The foregoing recitals are true and correct and incorporated herein.
B. Based on substantial evidence, both written and oral, from the public hearing, the Planning Commission makes the following findings and takes the following actions on PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634), PL24-0081 (Special Conditional Use Permit):
1. PL22-0075 (Site Approval)
a. The proposed Project is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), as General Plan Goal LU-1 aims to enhance livability in the City, with Objective LU-1.1 encouraging a variety of housing types that meet the housing needs of residents of all income levels in Chino. The Project is located on a site designated General Commercial (GC) with a Mixed Use Overlay (MUO), as identified in the City’s 2021-2029 Housing Element, and proposes 264 multifamily units (including 24 affordable units for low-income households), 20,800 square feet of commercial space, and a 132,438 square foot selfstorage facility, located within the Mixed Use Overlay (MUO) within the East Chino Specific Plan (ECSP) and has been designed to meet applicable development standards and design guidelines;
810
RESOLUTION NO. PC2025-009
b. The proposed Project is permitted within the zoning district in which it is proposed and complies with all applicable provisions of the City's Zoning Code. The Project site is located in the GC land use designation of the East Chino Specific Plan and within the MUO district which allows for mixed-use projects with affordable residential units. The proposed Project includes the development of a 264-unit, four-story apartment building, 20,800 square feet of commercial space, and a 132,438 square foot self-storage facility.
The Project complies with all standards including building setbacks, lot coverage, height, parking, and landscape requirements;
c. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape, access, type and intensity of development have been met or exceeded. The 9.82-acre site is flat and will have adequate infrastructure and five points of vehicular access from Euclid Avenue, Fern Avenue and Schaefer Avenue. Utilities and stormwater improvements will be extended to serve the site;
d. The subject site for the Project relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed Project, in that the Project site is located along Fern Avenue and Schaefer Avenue, which are designated as primary arterials and Euclid Avenue, which is designated as an expressway. Access to the site is provided from the adjacent streets. The surrounding streets have been designed to carry the type of traffic visiting the site and additional street improvements will be required of the Project to improve the streets to ultimate conditions where needed; e. The proposed Project is compatible with those on abutting properties and in the surrounding neighborhood. There is an existing commercial center, Stater Brothers Plaza, located to the south of the Project site which will interface with the commercial component of the Project. The parcel to the north is currently vacant with an underlying land use designation of GC and within the MUO, consistent with the Project site. The property to the east is located within the City of Ontario and has been designated Medium Density Residential by the Ontario General Plan, with an Affordable Housing Overlay. The Medium Density designation in Ontario allows development at 11 to 25 units per acre while the Affordable Housing Overlay in Ontario allows a minimum of 20 units per acre and a maximum of 30 units per acre, consistent with the City of Chino MUO. The property west of the Project site is designated RD 4.5 by the ECSP. Compatibility with the property located west of the Project site is achieved through transitional building heights, increased setbacks along Fern Avenue adjacent to single-family homes, and a contemporary architectural design that includes a palette of earth-tone colors;
811
RESOLUTION NO. PC2025-009
f. The proposed location, size, and operating characteristics of the proposed Project will not be detrimental to the public interest, health, safety or general welfare, as the proposed mixed-use development of residential and commercial uses supports walkability and neighborhood serving uses and is consistent with the MUO. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”; g. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
h. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.
2. PL24-0080 (Tentative Parcel Map No. 20634):
a. Consistency with plans. The proposed subdivision, together with the provisions for its design and improvements, is consistent with the City’s General Plan and ECSP. The site lies within the GC land use designation with a MUO, and the subdivision supports development consistent with these designations, including the construction residential, commercial and self-storage uses;
b. Consistency with zoning. The proposed subdivision is consistent with the provisions of the Chino Zoning Ordinance and the ECSP, in that all proposed parcels exceed the minimum 10,000 square foot lot size requirement of the MUO district;
c. Suitability. The site is physically suitable for mixed-use development because all required on and off-site improvements necessary to accommodate the development will be provided in accordance with City requirements. The site is flat and does not have any development constraints that would hinder future development, and the parcels being created are of sufficient size and dimensions to accommodate the mixed812 RESOLUTION NO. PC2025-009
use development in accordance with the requirements of the ECSP and MUO;
d. Environmental damage. The proposed subdivisions or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared for this Project, that concludes that the subdivision would not create any new significant impacts, or impacts that are significantly different than those identified in the City of Chino General Plan EIR; e. Wastewater. The discharge of waste from the proposed subdivision into a community sewer system will not result in violation of existing requirements prescribed by a California Regional Water Quality Control Board pursuant to Division 7 (commencing with Section 13000 of the Water Code); f. Water service. The review of the City Engineer or water service agency concludes that there is sufficient water to provide for the mixed-use development of the subdivision. Studies have been provided as part of the Addendum demonstrating that the capacity of existing water, system is adequate;
g. Soils and geology. There are no adverse soil or geological conditions, according to a soils report provided with the Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project;
h. Public health. The design of the subdivision and the associated improvements will not cause serious health problems because full public improvements will be provided and will also be designed and constructed in conformance with City standards as well as applicable State and federal regulations;
i. Easements. The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. Covenants, Codes, and Restrictions (CC&Rs) are required to be recorded with the final map and will include provisions to assure maintenance of all common areas, including landscaping, site access points and off-street parking areas, and to assure common ingress and egress between parcels;
j. Environmental documentation. The environmental documentation is adequate and conforms with the provisions of the California Environmental Quality Act. An Addendum to City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development 813
RESOLUTION NO. PC2025-009
Project, has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
k. Agricultural suitability. The proposed subdivision will not result in the subdivision of agricultural parcels to a size too small to sustain agricultural use under the conditions for denial listed in Section 66474.4 of the Subdivision Map Act, as the Project site is not currently encumbered with any Williamson Act contracts.
3. PL22-0074 (Special Conditional Use Permit – Self-Storage Facility):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), in that self-storage facilities in the MUO district are allowed, subject to approval of a SCUP.
General Plan Objective LU-1.3 encourages commercial development that will support and enhance vibrant commercial areas and serve existing neighborhoods. Establishing a self-storage facility that is professionally operated at this location will serve the residents and local businesses within the City;
b. The subject site is physically suitable, including but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development. Additionally, the proposed self-storage facility meets all requirements and development standards set forth in Section 20.09.090.E.4 (Public Storage Facilities) in the Zoning Ordinance;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as the self-storage use is located adjacent to Euclid Avenue with direct access to the self-storage facility from two driveways on Euclid Avenue. Euclid Avenue is designated as an expressway and designed to carry the volume of traffic typically generated by self-storage facilities, which is generally low in volume. All other surrounding streets (Fern Avenue and Schaefer Avenue) are also capable of handling the volume of traffic generated by the proposed use; d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood, as the self-storage facility is located at the northeast corner of the Project site, adjacent to Euclid Avenue and a vacant parcel to the north. The self-storage facility will have direct access from 814
RESOLUTION NO. PC2025-009
Euclid Avenue and is anticipated to generate a low volume of traffic based on data provided in the Traffic Impact Analysis that was prepared for the overall Project. There will be no direct views from the self-storage facility to the residential properties located over 162 feet to the north. The selfstorage facility is located over 600 feet from the existing residential homes located on the west side of Fern Avenue. In addition, self-storage facilities are inherently low intensity in terms of traffic generation, noise, and activity levels, resulting in minimal trips that are short and infrequent; e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as self-storage facilities are inherently low impact land uses that generate minimal vehicular traffic, with customer visits typically being short, infrequent, and dispersed throughout the day. In addition, the facility’s design and operational plan will include security measures such as controlled access, lighting and 24/7 surveillance systems, further promoting safety;
f. The proposed use will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”. In addition, the self-storage facility meets all required development standards and policies.
4. PL24-0081 (Special Conditional Use Permit – Drive-Thru Restaurants):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s); in that drive-thru restaurants in the GC land use designation of the ECSP are allowed, subject to approval of a SCUP. Furthermore, Objective LU-1.3 of the City’s General Plan encourages commercial development that will support and enhance vibrant commercial areas to serve existing neighborhoods with a combination of daily and specialty daily needs;
815
RESOLUTION NO. PC2025-009
b. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as site access is provided to the fast-food drive-thru restaurants directly from Euclid Avenue and Schaefer Avenue.
Both streets are designed to carry the traffic typically generated by drivethru restaurants. All surrounding streets are capable of handling the volume of traffic that is consistent with the proposed mixed-use development; d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood; as the drive-thru restaurants, with the approval of a SCUP, is compatible with the commercial development to the south, single family residential to the west, vacant land to the north, and future multi-family residential to the east in the City of Ontario and is consistent with the uses permitted in the GC land use designation of the ECSP. The drive-thru restaurants are strategically plotted at the southeastern corner of the Project site, away from the single-family residential homes to the west and north. Homes to the west are buffered from the proposed apartment building and Fern Avenue, while the homes to the north are buffered by the self-storage facility and vacant 3-acre piece of land;
e. The proposed location, size, and operating characteristics of the propose use will not be detrimental to the public interest, health, safety or general welfare; as the drive-thru restaurants, with the approval of a SCUP, are compatible with the commercial development to the south, single-family residential to the west, vacant land to the north and future multi-family residential to the east in the City of Ontario and is consistent with the uses permitted in the GC land use of the ECSP. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”. In addition, the drive-thru restaurants meet all required development standards and policies;
f. The proposed use will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use 816
RESOLUTION NO. PC2025-009
Development Project, has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. Further, the proposed use meets all required development standards and policies pertaining to self-storage facilities.
5. Affordable Housing Findings:
a. The proposed development meets the affordability criteria for the requested density in accordance with the requirements of subsection (D) and (I). The applicant proposes the construction of 264 multi-family rental units on 9.82 acres, resulting in a density of 26.9 dwelling units per acre. To qualify for this density, the Project is required to provide a minimum of 9% of the total of units as affordable to low income households. In compliance with this requirement, 24 of the 264 units will be affordable units; and b. The increased density would not have a specific adverse impact, as defined in paragraph (2) of subdivision (d) of Section 65589.5 of the Government Code, upon public health and safety or the physical environment or on any real property listed in the California Register of Historic Resources, as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines that confirms the increased density, would not result in any new significant environmental impacts than those already analyzed in the certified General Plan EIR.
6. CEQA Findings. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared by Applied Planning for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Planning Commission has considered the Addendum and Environmental Impact Report as part of its decision on this Project pursuant to Section 15164. The Planning Commission hereby finds that the Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Planning Commission hereby finds that the Project will not have any impacts that would require a revision to the EIR or any other additional environmental review.
7. Approval of PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit). The Planning Commission hereby approves PL22-0074 817
818
EXHIBIT A
DEPARTMENTAL
CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
The departments listed below have reviewed the above referenced application. Those departments marked with an “X” have required conditions of approval to be imposed on the project.
Development Services Department –
[X] Planning Division
[ ] ADA Accessibility Division
Public Works Department –
[X] Engineering Division
[ ] Traffic Division
[X] Chino Valley Independent Fire District
[X] Police Department
[ ] Finance Department
[ ] Community Services, Parks & Recreation Department
819
DEVELOPMENT SERVICES DEPARTMENT
PLANNING DIVISION CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
NOTE: CONDITIONS UNDER SECTION 4.17 AND IN BOLD WERE ADDED BY THE PLANNING COMMISSION.
1.0 TIME LIMITS:
1.1. The above referenced Site Approval and Special Conditional Use Permits shall expire on May 21, 2026, if building permits are not obtained and/or the approved uses have not commenced. The expiration date may be extended upon written request by the applicant on a City application form.
The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.
1.2. The above reference Tentative Tract Map shall expire on May 21, 2027, if the final map is not recorded. The expiration date may be extended upon written request by the applicant on a City application form. The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.
1.3. Should any of the special conditionally permitted uses cease to exist for 180 or more consecutive days, then the permit shall be deemed null and void.
2.0 GENERAL REQUIREMENTS:
2.1. Failure to comply with any conditions of approval shall be deemed just cause for revocation of project approval by the Planning Commission.
2.2. The project shall proceed only in accordance with the approved plans on file with the Development Services Department, and with the conditions contained herein and the Chino Municipal Code.
820
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
2.3. The Director of Development Services shall have the authority to approve minor deviations in the site plan, architecture and/or landscape providing the total approved building area is not exceeded. If it is determined that the changes will be substantial, approval from the Planning Commission will be required.
2.4. Approval of this request shall not waive compliance with all sections of the Chino Municipal Code, all other applicable City ordinances, and applicable specific plans.
2.5. Pursuant to Government Code Section 66020, the applicant is informed that the 90-day period in which the applicant may protest the fees, dedications, reservation or other exaction imposed on this project through the conditions of approval has begun.
2.6. In the event that any condition contained herein is determined to be invalid or legally unenforceable, then all remaining conditions shall remain in force.
2.7. In the event that any condition imposing a fee, exaction, dedication, or other mitigation measure is challenged by the project’s sponsors and/or other parties in an action filed in a court of law, which action is brought within the time period provided for by law, this approval shall be suspended pending dismissal of such action, the expiration of the limitation period applicable to such action, or final resolution of such action. If any condition is invalidated by a court of law, the applicable section of the entire project shall be reviewed by the City and substitute conditions may be imposed.
2.8. The applicant shall indemnify the City and its elected boards, commissions, officers, agents and employees and will hold and save them and each of them harmless from any and all actions, claims, liabilities, losses, damages, penalties, obligations and expenses, including but not limited to attorneys’ fees and costs, (collectively “claims”) against the City for any such claims and shall be responsible for any judgment arising therefrom. The City shall provide the applicant with notice of the pendency of such action and shall request that the applicant defend such action. The applicant may utilize the City Attorney’s office or use legal counsel of its choosing, but shall reimburse the City for any necessary legal cost incurred by City, including for the City’s required participation in defense of the claims. The applicant shall provide a deposit in the amount of 100% of the City’s estimate, in its sole and absolute discretion, of the cost of litigation, including the cost of any award of attorney’s fees, and shall make additional deposits as requested by City to keep the deposit at such level. If the applicant fails to provide or maintain the deposit, the City may 821
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
abandon the action and the applicant shall pay all costs resulting therefrom and City shall have no liability to the applicant.
2.9. The City of Chino has an exclusive contract with Waste Management for all solid waste collection and hauling services within the City. The applicant shall be responsible for making arrangements with Waste Management for disposal of any/all construction debris or trash generated as a result of this permit. Waste Management can be reached at 1-800 423-9986.
2.10. Any change of use in the project shall be reviewed by the Development Services Department for compliance with CEQA.
2.11. All proposed signs shall be designed to conform with Chino Municipal Code Title 16 (Signs) and shall require separate application and approval by the Director of Development Services prior to installation. The applicant shall submit a Sign Program to the Development Services Department for review and approval.
2.12. Pursuant to Public Resources Code Section 21089 and Fish and Wildlife Code Section 711.4, the developer shall provide those fees marked [X] below in the form of a check made payable to the San Bernardino County Clerk of the Board of Supervisors within 5 days of Planning Commission approval. Project approval shall not be complete until the required fee(s) is (are) paid:
[X] $50 for the Notice of Determination filing fee.
2.13. Special Conditions:
2.13.1. Since the project is utilizing the Affordable Housing Overlay component, the applicant shall enter into an Affordable Housing Overlay agreement with the City in a form approved by the City Attorney.
2.13.2. All fees, including City Attorney fees, associated with drafting the Affordable Housing Overlay agreement shall be paid by the developer.
3.0 PRIOR TO RECORDATION OF THE FINAL MAP:
3.1. The Covenants, Conditions, and Restrictions (CC&Rs) shall be prepared in accordance with the City Attorney Policy – Guidelines and Protocol for Review and Approval of CC&Rs and submitted for review and approval by the Development Services and Public Works Departments, Planning and 822
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
Engineering Divisions, and the City Attorney. The approved CC&Rs shall be recorded concurrently with the final map and a recorded copy submitted to the Director of Development Services. The following items shall be included in the final CC&Rs:
3.1.1. Reciprocal agreement to assure maintenance of all common areas, including landscaping, site access points and off-street parking areas, and to assure common ingress and egress between parcels.
The intent of the CC&Rs is to assure that the entire project is designed and maintained in a uniform and comprehensive manner.
3.1.2. Provide a maintenance agreement for review and approval. The proposed maintenance agreement shall contain the Owner’s maintenance obligations with respect to various facilities including, but not limited to, right-of-way landscaping, private streets, sidewalks, utilities, streetlights, and Water Quality Management Plan (WQMP) features. This document must be submitted to and approved by the City before it is submitted to any other governmental entity.
3.1.3. After recordation of Tentative Tract Map No. 20634, provide one hard copy and one electronic copy of the recorded CC&Rs shall be submitted to the Director of Development Services.
4.0 PRIOR TO THE ISSUANCE OF A BUILDING AND/OR GRADING PERMIT:
4.1. The developer shall pay development impact fees per Engineering’s conditions. Other applicable fees may include, but not be limited to, new construction fee, park or open space fees, school fees, drainage fees, sewer fees, building permit and plan check fees.
4.2. Revised plans, incorporating all conditions of approval, shall be submitted for review and approval by the Director of Development Services.
4.3. All plans shall be coordinated for consistency.
4.4. The developer shall submit two sets of structural plans/construction documents. Said plans shall include one set of structural calculations, one set of Title 24 energy calculations, and one soils report. The developer shall also submit the above documents in digital format to the Building Division once approved.
4.5. A construction management plan shall be submitted for review and approval by the Director of Development Services. The plan shall coordinate and address construction activities that may impact residents, 823
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
the Police Department, School District, other parties that provide essential services, and/or surrounding businesses in adjacent areas. Elements of the plan would contain, but not be limited to, the following:
a. Routing of construction equipment
b. Hours of operation
c. Dust control
d. Vector control
e. Vehicle, equipment, and personnel staging
f. Pre-construction meetings
g. Contractor/subcontractor acknowledgement, obligations, and penalties h. Traffic control and coordination
i. Security and interim fencing
j. Signs posted on the site with a contact number for the job site construction manager and the City’s Code Enforcement Division. Signs shall measure at least four feet by eight feet, and shall be posted along every street frontage. The developer shall contact the City immediately upon any change in contact numbers.
k. Building and landscape phasing. This plan shall show which buildings and landscaping will be completed in which phases, and how each completed phase will be closed off from phases under construction so as to minimize conflict between construction vehicles, construction equipment, employees, and residents, as applicable.
4.6. A precise wall plan indicating the design, location and construction details of all walls and fences shall be submitted for review and approval by the Planning and Building Divisions. All perimeter and street-facing walls, including retaining walls, shall be decorative in nature.
4.7. Prior to the issuance of any grading permit, detailed on-site landscaping and irrigation construction drawings along with a copy of the Planning Commission approved conceptual landscape plans and a copy of the conditions of approval shall be submitted for review and approval by the Director of Development Services. A grading permit will not be issued until the City’s outside plan checker has completed one review of detailed landscape and irrigation plans for the development. Payment of the Landscape & Irrigation Plan Review Fee shall be due at the time of submittal. Plans shall be prepared to comply with the City’s Water Efficient Landscape Ordinance, adopted on October 6, 2015, Ordinance No. 2015-008, meet the requirements for a Landscape Documentation Package in accordance with Section 20.19.030 of the Landscape Ordinance, and shall bear the seal of a landscape architect registered with the state of California. If the site includes areas proposed to be placed within a City-maintained Landscape Maintenance District, then the plans shall be prepared on City of Chino, Engineering Division base sheets, and 824
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
shall bear the seal of a landscape architect registered with the state of California. Original mylars shall be submitted to the City upon approval of plans by the City Engineer.
4.7.1. To minimize damage to paved areas due to tree root growth, trees located within five (5) feet of any paved surface area shall be provided with root barriers unless it can be demonstrated, to the satisfaction of the Planning Division, that the root growth characteristics of the type of tree proposed does not warrant their installation.
4.8. Approval of the conceptual landscape plan by the Planning Commission does not constitute final approval. The final landscape approval (during the plan check process and/or following installation) shall be subject to the review and approval of the City’s Landscape Architect Consultant and the Director of Development Services. The City Landscape Architect or Director of Development Services may require additional/fewer trees, shrubs, vines, and ground cover as necessary, based on final site conditions during the landscape plan check process or field review process in order to mitigate any site conditions that were not apparent during either the Planning Commission review or plan check review process.
4.9. All new ground-mounted utilities, including but not limited to cable television facilities, and telephone/fiber optic facilities, shall be undergrounded. Equipment that that is not placed underground such as SCE transformers, backflow prevention devices, irrigation valves and controllers used for common landscape areas shall be placed in areas out of public view and sufficiently screened. The location and method of screening of said utilities shall be reflected in a plan and shall be subject to the review and approval by the Director of Development Services.
4.10. All electrical panels and cabinets shall be completely screened. All electrical panels and cabinets shall be fully enclosed, and integrated into and architecturally compatible with the building to the satisfaction of the Director of Development Services. The locations of the electrical panels and cabinets shall be reflected on a site plan and elevation(s) to be reviewed and approved by the Director of Development Services.
4.11. Prior to the issuance of a building permit, the approved grading plans shall be attached to the construction plan set. The project shall be built according to the plans approved by the Planning Commission on May 21, 2025, as prepared by AO Architects, Sitescapes, and Fuscoe Engineering.
Any substantial modification to the project shall require Planning 825
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
Commission review and approval. If minor in nature, the modification may be reviewed and approved by the Development Services Director.
4.12. A detailed on-site exterior lighting plan shall be submitted for review and approval by the Director of Development Services. Plans shall be designed pursuant to Chino Municipal Code Section 20.10.090 (Outdoor Lighting) and shall indicate fixture design, illumination (photometric), location, height and method of shielding, so as not to adversely affect adjacent properties.
4.13. Upon submittal of construction drawings to the Building Division for plan check review, all departmental conditions of approval for the project shall be included on the sheet following the title sheet, or the first sheet of the plans. A site plan shall also be attached to all sets of construction drawings. This condition shall be a minimum requirement for acceptance of construction drawings for the Building plan check review.
4.14. The applicant is required to contact the West Valley Mosquito and Vector Control District to determine if an inspection or field survey of potential vectors and their ectoparasites is necessary. If the District so determines, an inspection or field survey shall be conducted by the District, at the applicant’s expense, prior to demolition or grading in order to protect the health of and reduce the risk of neighboring residents to vector-borne diseases. Based on the inspection or survey results, the applicant shall take appropriate vector control methods as recommended by the District.
4.15. A Water Quality Management Plan shall be prepared in accordance with County of San Bernardino requirements and submitted for review and approval by the City.
4.16. No grading permits shall be issued until all applicable biological resource mitigation measures, identified in the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, prepared by Applied Planning, Inc., dated September 23, 2024, as they apply to the project area, have been complied with to the satisfaction of the Director of Development Services.
4.17. Special Conditions:
4.17.1. Electrical transformers shall be located in areas that are the least visible to the public and adequately screened to the satisfaction of the Director of Development Services.
826
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
4.17.2. An Administrative Approval (AA) application shall be required if any of the proposed tenants for the drive-thru restaurants are a high-volume drive-thru user that would exceed the current drivethru design capacity.
4.17.3. The massing of the residential building along the north elevation shall be reduced from 4-stories to 3-stories.
4.17.4. The massing of the residential building around the courtyard shall be increased from 3-stories to 4-stories.
4.17.5. Signage and artwork shall be incorporated at key locations as follows:
4.17.5.1. The word “Chino” shall be displayed at the top of the monument signs located at the Euclid Avenue
and Schaefer Avenue driveway entrances.
4.17.5.2. Artwork that reflects the historical significance of the site (e.g. strawberry farming) shall be
provided at the Euclid Avenue and Schaefer
driveway entrances.
4.17.5.3. City of Chino identification signage shall be provided within the planter area located at the
corner of Euclid and Schaefer Avenues.
4.17.5.4. The mural located on the south elevation of the self-storage building shall reflect themes that
represent the City of Chino and the history of the
site.
4.17.5.5. Posters placed at the driveway entrances along Euclid Avenue and Schaefer Avenue shall
incorporate the word “Chino.”
5.0 PRIOR TO START OF CONSTRUCTION:
5.1. A pre-construction meeting, scheduled with the Building Division, shall be held with all applicable City staff members, developer, contractor, superintendent, and all subcontractors prior to start of construction.
5.2. Detailed landscape and irrigation plans for the development shall be approved by the Director of Development Services.
827
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
5.3. The approved construction management plan shall be distributed to all contractors and subcontractors and shall be maintained on-site through the duration of construction.
6.0 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
6.1. All conditions of approval shall be completed to the satisfaction of the Director of Development Services.
6.2. The fee for review of the landscaping and irrigation plans by both the City and the City’s landscape architect shall be paid by the developer.
6.3. All landscaping and irrigation shall be installed in accordance with plans on file with the Development Services Department, and irrigation systems fully operational. In addition, all hardscaped and landscaped areas shall be free of trash and debris.
6.4. A licensed landscape architect or contractor, or other licensed certified professional in a related field shall conduct a final field inspection and shall prepare a certificate of completion, which shall be filed with the Director of Development Services. The certificate of completion shall be prepared in accordance with Section 20.19.030.J of the Landscape Ordinance and shall specifically indicate that plants were installed as specified by the landscape design plan, that the irrigation system was installed as specified by the irrigation design plan, and that an irrigation audit has been performed. All landscape and irrigation audits shall be conducted by a landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape.
6.5. A landscape maintenance program for the entire project site shall be reviewed and approved by the Director of Development Services. The maintenance program shall include general landscape maintenance provisions for pruning, trimming, the replacement of any dead, decayed, or diseased vegetation, ongoing weed abatement, and replacement/repair of the irrigation system, when necessary. The landscape maintenance program shall be included with the contract with the landscape maintenance company to ensure they implement the maintenance program. In addition, the maintenance program should include provisions for periodic inspections to ensure the irrigation system is working properly, and all landscaping is being properly maintained.
6.6. Prior to issuance of a final certificate of occupancy, any temporary construction office buildings/trailers shall be removed from the site. 828
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
6.7. The project site shall be clean and free of trash and construction debris, and all construction equipment shall be removed from the site.
6.8. Special Condition:
6.8.1. Prior to the issuance of a Certificate of Occupancy for the residential component of PL22-0074 (Site Approval), a building permit shall be issued, and construction shall have commenced for the commercial portion of the project.
6.8.2. Provide trees planted in tree wells and/or potted plants with irrigation in areas adjacent to all shops where landscaping is not provided next to building walls, and to break up large, paved areas to enhance the landscape design. The location of these potted plants shall be shown on the landscape plans and the final number and locations shall be subject to the review and approval of the Director of Development Services.
7.0 ENVIRONMENTAL REQUIREMENTS & MITIGATION MEASURES:
7.1. Comply with all mitigation measures identified in the Mitigation Summary Matrix contained within the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project and attached as Exhibit “A” to the conditions of approval, which identifies each environmental mitigation measure, the time in which it will be implemented and the responsible party for monitoring its implementation.
8.0 OTHER REQUIREMENTS:
8.1. The applicant shall disclose to all potential tenants or owners of units or buildings that the businesses/uses must be consistent with the standards of the land use designation/zoning district in which the project site is located.
8.2. The project site shall be cleared of all trash, debris, weeds, and other discarded items, and all existing buildings or structures on the project site that are proposed to be demolished shall be removed or razed within 90 days of Planning Commission approval or issuance of a grading permit, whichever occurs first. The Director of Development Services may approve an extension of time to complete the demolition, based on evidence that the applicant has exercised reasonable progress.
8.3. A coating that will facilitate the removal of graffiti shall be applied over the complete height of one side/both sides of walls and/or fences, and to a 829
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
height of eight feet on building walls. If a coating is not provided, the owner of the property shall paint the buildings and/or walls to remove graffiti within 72 hours of notice.
8.4. Building and Site Design:
8.4.1. Exterior building color shall be reviewed and approved by the Director of Development Services. Colors shall be coordinated between structures, utilizing compatible hues and intensities. Final review and approval of paint colors utilizing a color test may be required prior to painting any structure, if determined necessary in the field by the Director of Development Services.
8.4.2. All building drainage gutters, downspouts, vents, etc., located on the exterior walls shall be architecturally compatible with the exterior building design and color, to the satisfaction of the Director of Development Services, or shall be completely concealed from view. They shall not be located on the exterior of building walls near office areas or other prominent locations on the buildings.
8.4.3. All new mechanical equipment and appurtenances of any type (including, but not limited to, electrical cabinets, HVAC equipment, skylights, stack vents or fans) whether located on rooftops, ground level or anywhere on the building structure, shall be completely screened so as not to be visible from any public street and/or adjacent property, subject to review and approval by the Director of Development Services. The parapet wall should serve as the primary method of screening, or the facilities shall be enclosed within the structure of the building. Such enclosure of facilities shall be of compatible design related to building structure for which such facilities are intended to serve.
8.4.4. Returns for parapet walls shall not be visible from public view and shall be evaluated in the field during construction, and modified if necessary so as not to be visible. All parapet returns shall be a minimum of 4 feet deep.
8.4.5. New ladders for roof access shall be mounted on the inside of the building within the commercial projects.
8.4.6. All new overhead doors, mechanical doors and/or man doors shall be color coordinated with the building.
8.4.7. All landscaping shall be designed and installed in accordance with Chapter 20.19 of the Chino Municipal Code.
830
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
8.5. Parking and Lighting:
8.5.1. All exterior lighting fixtures shall be installed in accordance with plans on file with the Development Services Department and shall be fully operational prior to occupancy.
8.5.2. All building-mounted light fixtures within public areas shall be decorative in nature and architecturally compatible with the building. Building-mounted light fixtures shall be reviewed and approved by the Director of Development Services prior to installation. “Wall-paks” or other standardized exterior lighting shall not be permitted within public areas unless reviewed and approved by the Director of Development Services.
8.5.3. All parking and loading areas shall be paved and double-striped in accordance with plans on file with the Development Services Department, Chino Municipal Code Chapter 20.18 (Parking) and the disabled parking and accessibility requirements of state law (see the CalDAG—California Disabled Accessibility Guidebook).
8.5.4. Drive surfaces contiguous with planter areas shall have a 6-inch raised curb separation.
8.5.5. All parking spaces, aisles, entrances and exits shall be doublestriped per City standards.
8.5.6. All parking spaces for compact cars shall be clearly identified as "Compact Car Only" on the pavement, at the opening of the space.
Compact parking spaces shall be reasonably distributed throughout the parking area, subject to review and approval by the Director of Development Services.
8.5.7. Special Condition:
8.5.7.1. A parking management plan shall be prepared by the applicant and submitted to the Director of Development
Services for review and approval. The plan may include, but not be limited to the following: assignment of parking garage spaces, assignment of open parking, designation
of guest parking, guest parking passes, no parking areas, enforcement, penalties, and towing. Once the plan is
approved by the City, the applicant shall explain the
parking assignments and restrictions to each new tenant within the development prior to commencement of the
lease.
831
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
8.6. Refuse and Recycling:
8.6.1. Separate receptacles (bins) for the collection of refuse, recyclable, and organic materials shall be provided. An adequate number of bins to all for the collection of refuse, recyclable, and organic materials generated by the development shall be provided.
8.6.2. Receptables (bins) shall be located entirely within building(s) or enclosed by a 6-foot- high (1.83 m) wall and provided with a solid roof shade structure that is designed to be architecturally compatible with the building(s), with solid view obstructing gates fitted with self-closing door devices, and be designed with cane bolts in front of the block walls to secure the gates when in the open position. The gates should also be equipped with rod locks and corresponding rod holes in both the open and closed gate positions. Bins containing recyclable materials shall be provided protection from adverse environmental conditions that might render the collection materials unmarketable.
8.6.3. No refuse/recycling enclosure shall be located within any required setback area.
8.6.4. All refuse and recyclable material bin enclosures not located in private yard areas shall be screened with landscaping on all sides, with the exception of the gate area. All sides of the enclosure, with the exception of the gate area, shall be surrounded by a minimum 18” wide planter area for the purpose of providing landscape material.
8.6.5. Refuse storage and recycling areas shall not be used for the storage of materials other than that for which it is designed (refuse and recyclable materials). The premises shall be kept in a neat and orderly condition, and in good repair and appearance at all times.
8.7. Chino Climate Action Plan:
8.7.1. Per Section 15.45.070 of the Chino Municipal Code, demonstrate consistency with the Chino Climate Action Plan by implementing one of the following three options:
a) Exceed the mandatory California Energy Code Title 24, Part 6 standards in effect at the time of application submittal by 5%; or b) Achieve an equivalent reduction through voluntary measures in the California Green Building Standards Code, Title 24, Part 11 (CALGreen) in effect at the time of application submittal; or 832
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
c) Provide other equivalent greenhouse gas (GHG) reductions through measures including but not limited to, non-vehicle transportation infrastructure, transit, ZEV (zero emission vehicle) infrastructure or other incentives, waste diversion, water conservation, tree planting, renewable energy option packages, or any combination of these or other measures such that GHG emissions are reduced by 0.74 MT CO2e per residential dwelling unit per year and/or per TSF of commercial/industrial use per year.
Applicants that choose Option a described above will be required to verify that their project meets the 5% improvement above the mandatory standards through the appropriate certificate of compliance form for residential construction (CF-1R) or for commercial/industrial construction (PERF-1C). Applicants that choose Options b or c described above will be required to utilize the GHG Performance Standard Checklist developed by the City, or provide other valid documentation, such as CalEEMod or other methodologies, as verified by the Director of Development Services to demonstrate the required GHG reductions consistent with the City's CAP.
9.0 THE APPROVED USES SHALL BE OPERATED IN ACCORDANCE WITH THE FOLLOWING:
9.1. All operations shall not create a nuisance due to noise, odor, dust, mud, smoke, steam, vibration or other similar causes.
9.2. The operation or activity shall not cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution that can cause damage to human health, vegetation, or other forms of air pollution that can cause excessive soiling on any other parcel. No emission shall be permitted which exceeds the requirements of the South Coast Air Quality Management District or the requirements of any Air Quality Plan adopted by the City of Chino.
9.3. The operation or activity shall not emit odorous gases or other odorous matter in such quantities as to be dangerous, injurious, noxious, or otherwise objectionable to a level that is detectable with or without the aid of instruments at or beyond the project site boundary.
9.4. The operation shall not discharge, at any point, into any public or private street, public sewer, storm drain, private stream, body of water, or into the ground, any material which can contaminate any water supply, interfere with bacteriological processes in sewerage treatment, or otherwise cause the emission of dangerous or offensive elements, except in accordance 833
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
with the standards approved by the California Department of Public Health, or any other federal, state or local government agency.
9.5. No operation or activity shall emit heat or cold that would cause a temperature increase or decrease on any adjacent parcel in excess of 100F (5.560C).
9.6. No operation or activity shall cause any impermissible source of electronic disturbance that adversely affects persons or the operation of any equipment on any other parcel that is not in conformance with the regulations of the Federal Communications Commission (FCC).
Impermissible interference for the purposes of this document shall mean any interference that violates the rules and regulations of the FCC and/or the Communications Act of 1934, as amended.
9.7. No operation or activity shall be permitted to cause a steady state, earthborne oscillation which is continuous and occurring more frequently than 100 times per minute beyond the project site. Ground vibration caused by moving vehicles, trains, aircraft, or temporary construction or demolition is exempted from this requirement.
9.8. Noise emanating from the project site, and which is received by adjacent land uses, shall not exceed the levels specified below, except that loudspeakers, bells, gongs, buzzers or other noise attention or attracting devices shall not exceed a maximum daytime dBA level of 60 and nighttime dBA of 40, measured anywhere beyond the boundaries of the property within which the noise is created.
10.0 CONSTRUCTION SITE SECURITY:
10.1. Each site shall be completely encircled by a minimum 6’ tall securityquality chain link fence once precise grading has been completed or as determined by the Building Official.
Maximum Time of
Exposure
Noise
Metric
Noise Level Not To Be Exceeded
7 a.m. to 10 p.m. 10 p.m. to 7 a.m.
30 Minutes/Hour L50 55 dBA 50 dBA
15 Minutes/Hour L25 60 dBA 55 dBA
5 Minutes/Hour L8.3 65 dBA 60 dBA
One Minute/Hour L1.7 70 dBA 65 dBA
Any Period of Time Lmax 75 Dba 70 dBA
834
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
10.2. Tennis court or similar screening material shall be securely attached for the length of the fence, excluding gates and 10’ on either side of gates.
10.3. Each site shall have only one entry/exit gate, or as approved by the Planning Division.
10.4. Gate hinge pins shall be spot-welded or altered in such a way as to prevent easy removal.
10.5. Each gate shall have a casehardened lock and chain, or other equivalent security hardware.
10.6. “No Trespassing” signs shall be attached to the exterior of the fence at a minimum distance of a third of a mile and at all entrances.
10.7. On or near the exterior of each gate will be a sign with the address of the site in no less than 6” letters. Both the number and street name will be listed on the sign. The address posted will be used for the entire site until the fence is removed and individual addresses assigned.
10.8. Office trailers and tool bins shall be placed adjacent to gates inside the property to allow observation from outside.
10.9. Lighting on trailers and bins is desirable but shall be directed into the property so as not to impede outside observation or endanger nearby traffic with glare.
10.10. Tool bins shall be secured with casehardened locks, preferably with lock guards.
10.11. A sign stating that theft is not acceptable on the site and will be reported to the police, or wording to that effect, will be displayed prominently near each entrance.
10.12. Each site will have an assigned Crime Prevention Manager who is responsible for the following:
a. Providing his/her name and 24-hour telephone access number to the Chino Police Department.
b. Have available at all times the names and 24-hour contact numbers for all subcontractors.
c. Have the authority to speak for the development/owners on matters concerning trespassing and other criminal matters.
d. Complete routine fence inspections and arrange for prompt repairs or removal of any damage, graffiti, or loose screening. 835
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
e. Ensure that no work or maintenance of construction equipment is being performed on the site between 8 PM and 7 AM.
f. Ensure that all above security requirements are complied with, and that all security hardware, fencing, and lighting are maintained in working order.
g. Ensure that thefts are immediately reported to the police department and that reasonable steps are taken, if evident, to prevent future similar incidents.
Attachment:
Exhibit “A” – Mitigation Monitoring and Reporting Program 836
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-2 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Aesthetics
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all aesthetics impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Agriculture and Forestry Resources
Under the General Plan, the conversion of two parcels that are currently in an active Williamson Act contract, and which are not found within The Preserve Specific Plan Area would occur. The Certified EIR determined this was a significant and unavoidable impact. No mitigation was presented.
As substantiated in this Addendum, all agriculture and forestry resources impacts of the Project would be less-than-significant. No mitigation is required of the Project.
Air Quality
The Certified EIR determined that the proposed land uses would be inconsistent with the previous General Plan upon which the 2007 South Coast Air Quality Management Plan (SCAQMP) was based. As such, the General Plan would therefore fail to conform to the planning assumptions included in the 2007 SCAQMP. The GPU’s conflict with the 2007 SCAQMP was disclosed as a significant and unavoidable impact.
Additionally, increased operational-related vehicle miles travelled (VMT) would result in increased emissions of criteria pollutants for which the region is non-attainment (ozone, PM10, and PM2.5). As such, operational emissions were deemed a significant and unavoidable impact.
No mitigation was available for the preceding impacts, and a statement of overriding considerations was adopted.
As substantiated in this Addendum, all air quality impacts of the Project would be less-than-significant. No mitigation is required of the Project.
837
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-3 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Biological Resources
Mitigation is not identified in the Certified EIR. Impacts to biological resources would be less-than-significant with the incorporation of Measures BIO-1 and BIO-2:
BIO-1 Avoidance of Nesting Migratory Birds: If possible, all vegetation removal activities shall be scheduled from August 1 to February 1, which is outside the general avian nesting season. This would ensure that no active nests would be disturbed and that removal could proceed rapidly. If vegetation is to be cleared during the nesting season, all suitable habitat will be thoroughly surveyed within 72 hours prior to clearing for the presence of nesting birds by a qualified biologist (Biologist). The Biologist shall be approved by the City and retained by the Applicant. The survey results shall be submitted by the Applicant to the City Planning Department. If any active nests are detected, the area shall be flagged and mapped on the construction plans along with a minimum 300-foot buffer, with the final buffer distance to be determined by the Project Biologist. The buffer area shall be avoided until, as determined by the Biologist, the nesting cycle is complete or it is concluded that the nest has failed. In addition, the Biologist shall be present on the site to monitor the vegetation removal to ensure that any nests, which were not detected during the initial survey, are not disturbed.
BIO-2 Avoidance of Nesting Burrowing Owls: No more than 72 hours prior to any site disturbances, focused surveys for the burrowing owl shall be conducted. If absence of this species is confirmed, project work can proceed. If, however, burrowing owl is located on site, the appropriate resource agencies (CDFW and USFWS) shall be contacted. The Applicant shall consult with the wildlife agencies regarding the most appropriate methods and timing for removal of owls. As necessary, owls will be actively evicted following agency approved protocols (i.e., placing a one-way door at the burrow entrance to ensure that owls cannot access the burrow once they leave). Any such active 838
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-4 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
eviction shall occur outside of the breeding/nesting season. That is, if active eviction is required, eviction shall be accomplished between September 1 and February 15. If more than 30 days have elapsed between owl eviction and completion of clearing and grubbing activities, a subsequent survey for the burrowing owl shall be conducted to ensure that owls have not re-populated the site. Any reoccupation by owls will require subsequent protocol active eviction.
Cultural Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all cultural resources impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Energy
The environmental topic “Energy” has been added to the CEQA Guidelines Appendix G, Environmental Checklist Form since the adoption of the Certified EIR, and was therefore not specifically addressed in the Certified EIR. Mitigation is not identified in the Certified EIR.
As substantiated in this Addendum, all energy impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Geology and Soils
Mitigation is not identified in the Certified EIR. Geology and soils impacts would be less-than-significant with the incorporation of Measures GEO-1 and GEO-2:
GEO-1 Design and development of the Project shall comply with recommendations, specifications and performance standards identified within the Project Geotechnical Investigation. Where the Project Geotechnical Investigation is silent, requirements of the California Building Code as adopted and implemented by the City shall prevail.
839
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-5 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
GEO-2 A qualified paleontologist shall be retained to monitor any grading or trenching activities in excess of eight feet. If paleontological resources (fossils) are discovered during Project site-disturbing activities, work shall be halted in that area to assess the significance of the find. The Project paleontologist shall be equipped to record and salvage fossil resources that may be unearthed during site-disturbing activities. The paleontologist shall be empowered to temporarily halt or divert site-disturbing activities to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with the CEQA Guidelines and offered for curation at an accredited facility approved by the City.
Greenhouse Gas Emissions
MM AQ-2 Objective OSC-5.1 Action A1
No later than December 31, 2013, the City shall develop and approve a Climate Action Plan (“CAP”). The CAP shall include, at a minimum, the elements specified in Exhibit D of the Settlement and Release Agreement between CREED and the City of Chino dated December 19/20, 2011.1
GHG impacts would be less-than-significant with the incorporation of Measure GHG-1:
GHG-1 The Project final plans and designs shall conform to the provisions of the CAP Update through implementation of the Screening Table Measures.
The Project shall implement Screening Table Measures providing for a minimum 100 points. The City shall verify incorporation of the identified Screening Table Measures within the Project building plans and site designs prior to the issuance of building permit(s) and/or site plans (as applicable).
Alternatively, the Project would be required to comply with City of Chino Municipal Code Section 15.45.070 - GHG Performance Standards for New Development.
Hazards and Hazardous Materials
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all hazards and hazardous materials impacts of the Eden Mixed-Use Development Project would 1 It is noted that this Mitigation Measure has been revised (as presented) since the adoption of the Certified EIR. 840
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-6 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
be less-than-significant. No mitigation is required of the Project.
Hydrology and Water Quality
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all hydrology and water quality impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Land Use and Planning
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all land use and planning impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Mineral Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all mineral resources impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Noise
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all noise impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Population and Housing
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all population and housing impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Public Services
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all public services impacts of the Eden Mixed-Use Development Project would be less-than-significant.
No mitigation is required of the Project.
841
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-7 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Recreation
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all recreation impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Transportation
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all transportation impacts of the Eden Mixed-Use Development Project would be less-than-significant.
No mitigation is required of the Project.
Tribal Cultural Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all tribal cultural resources impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Utilities and Service Systems
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all utilities and service systems impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Wildfire
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all wildfire impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
842
PUBLIC WORKS CONDITIONS OF APPROVAL
Reviewed/Approved By: J.P. Date: 5/14/25
Template Updated 6/24/24
PROJECT NO. PL22-0075 (SITE APPROVAL) & PL24-0080 (TM 20634) DATE: May 14, 2025 PC MEETING DATE: May 21, 2025
PROJECT DESCRIPTION: Orbis Commercial Center
PROJECT LOCATION: NWC Euclid Avenue (SR-83) & Schaefer Avenue APPLICANT: Clark Schaefer Partners, LLC PROJECT ENGINEER: Isidro Abreo
PRIOR TO THE FOUR MAJOR DEVELOPMENT EVENTS, THE APPLICANT SHALL SATISFY AND FULFILL ALL CONDITIONS OUTLINED BELOW. FAILURE TO COMPLY WITH ANY CONDITIONS OF
APPROVAL SHALL BE DEEMED JUST CAUSE FOR REVOCATION OF PROJECT APPROVAL BY THE PLANNING COMMISSION. HOWEVER, THE PUBLIC WORKS DIRECTOR SHALL HAVE THE
AUTHORITY TO APPROVE MINOR DEVIATIONS IN THE CONDITIONS OF APPROVAL AND ALL PLANS, INCLUDING THE CONSTRUCTION DRAWINGS.
1.0 PRIOR TO MAP RECORDATION (FOR TM 20634):
1.1 Provide a preliminary Title Report no older than 60 days.
1.2 Submit a soils/geology report in accordance with Appendix J of the California Building Code, latest edition to the project engineer for review and approval.
1.3 Make the following dedications:
Street Name Distance Direction From C/L
Fern Avenue(1) 52’ East
Schaefer Avenue(1) 53’ North
Euclid Avenue(1)(3) Varies(2) West
(1) Include corner cut-offs at the northeast corner of the Fern Ave & Schaefer Ave intersection and at the northwest corner of the Euclid Ave & Schaefer Ave intersection. (2) Street dedication ranges between 100 feet and 113 feet along the frontage on Euclid Ave. (3) Additional street dedication or an easement deed is required along the property's frontage to the north (A.P.N.1052-581-04) for the construction of public improvements on Euclid Ave. Those improvements include but are not limited to sidewalk, the project driveway, parkway landscape, curb, gutter, street paving, and utilities.
1.3b Prepare and record necessary drainage easements to implement the project in accordance with drainage law.
1.4 Provide and record a reciprocal use agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.
1.5 Provide a set of proposed Covenants, Conditions and Restrictions (CC&R) for review and approval.
The proposed CC&Rs shall contain the Association’s/Owner’s maintenance obligations with respect to various facilities including, but not limited to, right-of-way landscaping, private streets, sidewalks, utilities, street lights, and Water Quality Management Plan (WQMP) features. This document must be submitted to and approved by the City before it is submitted to any other governmental entity.
843
PL22-0075 (SA) & PL24-0080 (TM 20634) 2 May 14, 2025
1.6 Prepare and record a Covenant & Agreement for the two proposed contiguous parcels, which will include the storage facility building and the retail/food shops building. These parcels are proposed to share a common boundary and structural walls. The Covenant & Agreement shall establish the rights, responsibilities, and obligations of all current and future parties with an interest in either or both parcels. At a minimum, the document shall address the terms and conditions for the sale transaction of one or both of the subject parcels. The document shall also be reviewed and approved by the City prior to recordation.
1.7 Execute a Subdivision Agreement and submit security in an amount acceptable to the City Engineer to guarantee construction of the public improvements listed in 2.8. All security must be accessible to the City at any time and in a form acceptable to the City Engineer, pursuant to Government Code, Section 66499.
1.8 Provide a Monumentation Bond in an amount specified in writing by a Registered Engineer or Licensed Land Surveyor of Record.
1.9 Complete and file the petition for annexation of your project property to the City's Landscape and Street Lighting Maintenance District MD 2002-1.
1.10 Submit a list of proposed street names for the main driveway (new signalized intersection) for the project to the Street Naming Committee for name(s) selection.
1.11 Comply with all applicable requirements of the City Municipal Code.
1.12 Provide a Pedestrian Accessibility Plan that labels and indicates the path location and conceptual design of the following structures and facilities:
a. Sidewalks and walks (public right of way sidewalk, walks within the development); b. Curb ramps (should be directional with one curb ramp provided for each pedestrian crossing and shall comply with the City’s Policy on Accessible Pedestrian Facilities); c. Pedestrian crossings at driveways;
d. Crosswalks (marked, unmarked, signalized); and
e. Path of travel from right-of-way to recreation facilities (parks, restrooms) and each feature pad area or commercial building pad.
1.13 The Pedestrian Accessibility Plan requested in 1.12 should clearly indicate structures that are proposed with this site and future per other phases and/or site plans. Pedestrian facilities (privately or publicly owned) that are open to the public shall comply with accessibility standards in the City’s Policy on Accessible Pedestrian Facilities, the current edition of the CBC in effect at the time of building permit issuance or, if no permit, the date construction commences, and Part 36 of Title 28 of the Americans with Disabilities Act (ADA) regulations, which include the 2010 ADA Standards.
1.14 Existing pedestrian facilities on the frontage of the development, open to the public within the development, shall be evaluated for accessibility. The street frontage includes all adjacent pedestrian facilities, created by, extended from, or connected to any required or provided sidewalks improvements. The frontage may include sidewalks, curb ramps, connecting crosswalks (marked and unmarked), and other associated pedestrian facilities. a. The following existing improvements shall be made compliant with accessibility regulations as a part of this project:
i. sidewalks/walks
a. On Fern Ave, Schaefer Ave, and Euclid Ave.
ii. shared-use paths/multi-purpose paths
iii. curb ramps
a. Two (2) directional curb ramps at the northeast corner of Fern Ave and Schaefer Ave.
844
PL22-0075 (SA) & PL24-0080 (TM 20634) 3 May 14, 2025
b. One directional curb ramp at the northeast corner of New Driveway and Schaefer Ave
c. One directional curb ramp at the southeast corner of New Driveway and Schaefer Ave
d. Two (2) directional curb ramps at the northwest corner of Euclid Ave and Schaefer Ave.
iv. crosswalk pavement and associated pedestrian facilities (pedestrian push buttons, maneuvering space, clear space)
v. driveway approaches crossings
a. Two (2) on Fern Ave.
b. One (1) on Schaefer Ave
c. Two (2) on Euclid Ave
vi. parking space (onsite, no on-street parking)
b. Improvements that are non-compliant with the accessibility standards in effect at the time of construction or alteration, shall be brought up to current accessibility standards. This work shall be incorporated into the scope of this project and shall be completed prior to acceptance by the City.
c. Improvements that are compliant with the accessibility standards in effect at the time of construction, shall be documented on a separate construction plan with detailed specifications (running and cross slopes of all pedestrian walking surfaces, locations, dimensions and slopes of maneuvering spaces and landings, width of sidewalk, clear width and vertical clearance from obstructions). The accessibility of existing improvements will be verified by City inspection staff upon completion of the project. Discrepancies between documented existing conditions and existing conditions as measured by City staff shall be remediated and brought up to accessibility standards as part of the project.
1.15 Pay all applicable fees pursuant to City Municipal Code including, but not limited to, plan check fees.
2.0 PRIOR TO ISSUANCE OF BUILDING PERMITS FOR ANY LOT WITHIN THE SUBDIVISION/ PRIOR TO ISSUANCE OF CONSTRUCTION PERMITS:
2.1 Record Tract Map No. 20634 pursuant to the Subdivision Map Act and in accordance with City Municipal Code. Provide a duplicate photo Mylar of the recorded map to the City Engineer's office.
2.2 All required plans and studies shall be prepared by a Registered Professional Engineer and submitted to the project engineer for review and approval. All project plans must be approved by the City Engineer's office before a Building Permit will be issued. All maps, studies, calculation sheets, reports, etc. must be on and/or folded in an 11-inch x 8 1/2-inch standard format.
2.3 Provide a focused parking and circulation study comprising the project access/egress, internal circulation and project parking analyses. The study is subject to the review and approval of the City Traffic Engineer.
2.4 Prepare and submit a drainage study, including supporting hydraulic and hydrological data to the project engineer for approval. The study shall confirm or recommend changes to the City's adopted Master Drainage Plan by identifying off-site and on-site storm water runoff impacts resulting from build-out of permitted General Plan land uses. In addition, the study shall identify the project's contribution and shall provide locations and sizes of catchments and system connection points and all downstream drainage-mitigating measures.
845
PL22-0075 (SA) & PL24-0080 (TM 20634) 4 May 14, 2025
2.5 Prepare and submit a final grading plan showing building footprints, pad elevations, finished grades, drainage routes, retaining walls, erosion control, slope easements and other pertinent information in accordance with Appendix J of the California Building Code, latest edition.
2.6 Provide a certificate, from a Registered Civil Engineer, certifying that the finished grading has been completed in accordance with the City approved grading plan.
2.7 Design and install a monitoring manhole (per City Standard No. 530) on each domestic sewer lateral connection into a private sewer main that is tributary to the City's main sewer. In addition, a sampling Wye will be designed and installed on a stubbed-out sewer lateral connection into the main sewer for each industrial building in this development.
2.8 Design per City Standards and construct full public improvements for all impacted and interior streets/facilities in accordance with City Code, Standards and Specifications. Such public improvements shall include, but not be limited to, the following: (Please coordinate and verify all requirements with the project engineer.)
Street Names
Fern
Avenue(1)
Schaefer
Avenue
Euclid
Avenue(1)(8)
Curb & Gutter (Offset from Centerline) X(36’) X(84’-98’)(2) Sidewalk (Width) X(6’) X(8’) X(5’)
Asphalt Concrete Pavement on Aggregate
Base (Width from Centerline)(3)
X(3) X X
Asphalt Concrete Overlay X X X
Driveways (# of dwys)(4) X(2) X(1) X(2)
Street Lights(5) X X X
Median Island and Landscaping X(6) X(7)
Parkway Landscaping(9) X X X
Striping and Traffic Controls(10) X X X
Traffic Signal/Signal Modification X(11) X(12) X(13)
Traffic Signal Interconnect(14) X
Sewer(15) X
Storm Drain(16) X X
Domestic Water(17) X X X
Recycled Water
Fire Hydrants as required by CVIFD(18) X X X
(1) All pedestrian facilities along the project frontage shall be made accessible per the City’s Policy on Accessible Pedestrian Facilities. All existing public street improvements not up to current standards shall be remediated. This includes, but is not limited to, the removal and/or repair of any substandard or broken curb, gutter, sidewalks, pedestrian push buttons, crosswalks, and/or curb ramps. (2) An additional southbound right-turn lane is required to provide access to the two new driveways on Euclid Ave. The extent of this lane is between the northerly property line of APN 1052-581-04 and the new driveway closest to the Euclid Ave & Schaefer Ave intersection. (3) Grind and overlay or replacement of the existing street paving shall be required on Fern Avenue, Schaefer Ave, and Euclid Ave along the project frontage from the edge of pavement to the centerline of the streets. This will be based on the R-value and existing pavement condition of said streets as determined by core samples and the extent of any proposed utility improvements. Based on the extent 846
PL22-0075 (SA) & PL24-0080 (TM 20634) 5 May 14, 2025
of the storm drain improvements for this project, the full extent of the Fern Ave and Schaefer Ave intersection will also be included. All paving requirements will be at the discretion of the City Engineer. (4) The proposed driveways shall be constructed per City of Chino Standard No. 250 with 5-ft minimum sidewalks. Truncated domes are to be provided where the driveway approach is signalized or stop controlled, per ADA requirements.
(5) Streetlights on Fern Ave, Schaefer Ave and Euclid Ave shall be designed and constructed for public use using Southern California Edison’s LS-2 rate plan.
(6) Modify the existing median on Fern Avenue, near the north property line, to provide a turn pocket for southbound left turns into the project and allow for westbound left turns from the project. Note: The existing median has an opening precisely in line with the northerly property line that would need to accommodate the southbound left and westbound left turning movements. (7) A southbound left turn lane pocket is required at the Euclid Avenue & Schaefer Ave intersection. This lane requires a median to be constructed between the left-turn lane and the adjacent southbound through lane. The length of the median will be from the Euclid Ave & Schaefer intersection to just north of the new project driveway to enforce a right-in/right-out-only access at the new driveway closest to the intersection. The final design of this turn lane shall be designed and constructed to the satisfaction of the City Engineer. The street improvements shall be designed in conformance with Caltrans Highway Design Manual standards and specifications.
(8) Euclid Avenue is designated as a Major Arterial with a raised median with curbs and landscaping. In lieu of constructing said median improvements and installing landscape and irrigation systems, the developer shall pay an “in-lieu” fee to the City for the City to construct in the future. (9) The property owner is responsible for the parkway landscape maintenance. Parkway landscape and irrigation must be installed along the project frontage on Fern Ave, Schaefer Ave, and Euclid Ave. (10)New signing & striping is required at the new signalized intersection at the new driveway & Schaefer Ave. Both the Fern Ave & Schaefer and the Euclid Ave & Schaefer Ave intersections require restriping to accommodate the new curb ramps, sidewalks, and crosswalks. The City Traffic Engineer will determine the limits of the signing & striping.
(11)Modify the existing traffic signal on Fern Ave and Schaefer Avenue to accommodate the new curb ramps and corresponding pedestrian push buttons.
(12)A new signal is required at the new project driveway and Schaefer Avenue, between Fern Ave and Euclid Ave. Refer to Condition 1.13 for corresponding street improvements at the intersection, including those on the south side of Schaefer Ave.
(13)Modify the existing traffic signal on Euclid Ave and Schaefer Avenue to accommodate a modified southbound left turn pocket lane, new crosswalks, and curb ramps with corresponding pedestrian push buttons.
(14)As directed by the City Traffic Engineer, install conduit and pull boxes along the project frontage to accommodate future traffic signal fiber optics.
(15)A new public sewer lateral is to be constructed on Fern Ave, in line with the new drive aisle near the northern property line. The extent of this public line is from the point of connection to the City main and the proposed sewer monitoring manhole at the R.O.W./property line. The proposed onsite sewer lines shall be private. Refer to Condition 2.15 for private utility maintenance requirements. (16)A new storm drain line is being proposed along Schaefer Ave, connecting with the city’s existing storm drain main line at the Fern Ave & Schaefer Ave intersection. These improvements will require updating the City’s Master Plan of Drainage, as indicated in Condition 2.23. (17)Multiple water meters and service laterals constructed proposed on Schaefer Ave and one on Euclid Ave. Refer to City of Chino Std. 415A&B for 3” or larger meters. Water lines that go from the meter to the structures shall be private. Refer to Condition 2.15 for private utility maintenance requirements. 847
PL22-0075 (SA) & PL24-0080 (TM 20634) 6 May 14, 2025
(18)The applicant/property owner shall be solely responsible for any future maintenance and repair of fire service laterals at the project site in accordance with City Code, Chapters 13.04.175 and 13.12.150.
2.9 All improvements shall comply with federal, state, and local accessibility regulations and standards.
The review or approval of plans and specifications by the City does not permit the violation of any section of the federal law, state law, building code, or local ordinance. Where accessibility standards are contradictory, the provision that provides the most accessible (restrictive) condition shall apply. Where the project’s conditions of approval conflict with accessibility regulations and standards, the prevailing provision shall be determined by City’s Accessibility Coordinator and City Engineer.
2.10 Obtain design and plan approval from appropriate utility companies for undergrounding all overhead (dry) utility lines adjoining and interior to the project, including power lines of 34.5 kV or less, pursuant to City Municipal Code, Chapter 13.32. To accommodate the public improvements on Schaefer Avenue, relocation of the existing poles is required, in addition to the undergrounding of utility lines. Power lines exceeding the 34.5kV threshold can remain above ground with the relocated poles.
2.11 Prepare and submit a sewer collection system analysis to determine if downstream facilities are adequate to handle the proposed development. The analysis will evaluate the proposed point(s) of connection and determine if there are any system deficiencies or needed improvements in order for the proposed development to be connected to the City’s sanitary sewer collection system.
2.12 Pay all applicable fees pursuant to City Municipal Code including, but not limited to, the Development Impact Fees (DIF) and Sewage Facilities Development Fee (SFDF). The actual amount of fees due to the City will be based on the fee schedule in place on the date that the fees are due, or the date that they are paid, whichever occurs last. The fee amount stated in this notice is subject to change based on (1) annual adjustments for inflation, pursuant to Chino Municipal Code, Chapter 3.40.100 or 3.45.100, (2) revisions to the Chino Municipal Code, and (3) updates to the fee studies and nexus reports adopted by the City.
Developer is solely responsible for remaining informed about changes in the fee amounts. City shall have no obligation to inform Developer of changes in the fee amounts unless Developer requests notice of such changes, pursuant to Government Code Section 66019(b) and Chino Municipal Code Chapter 3.40.080(B) or 3.45.080(B).
2.13 All projects developing one (1) acre or more of total land area, or which are part of a larger phased development that will disturb one acre of land, are required to obtain coverage under the State Water Resources Control Board’s (SWRCB) General Permit for storm water discharges associated with construction activity. Proof of filing a Notice of Intent (NOI) with the SWRCB for coverage under this permit is required. A copy of the Waste Discharger’s Identification Number (WDID), issued by the SWRCB, must be submitted to the Project Engineer prior to issuance of grading permits. More detailed information regarding this General Permit, applicable fee information and the necessary forms to complete the NOI are available by calling (916) 341-5537 or on the SWRCB web site at http://www.swrcb.ca.gov/water_issues/programs/stormwater/constpermits.shtml
2.14 Pursuant to Santa Ana Regional Water Quality Control Board Order Number R8-2010-0036, NPDES Permit No. CAS618036, prepare a project-specific Water Quality Management Plan (WQMP) and submit to the project engineer for review and approval. To address NPDES Permit requirements to the maximum extent practicable, the project shall be designed to specify preferential use of Low Impact Development Best Management Practices that reduce pollutants and runoff volume through structural measures (e.g. infiltration, harvesting, and bio-treatment) and non-structural measures (e.g. preserving natural areas, clustering development, and reducing 848
PL22-0075 (SA) & PL24-0080 (TM 20634) 7 May 14, 2025
impervious areas). The WQMP shall conform to the requirements of the San Bernardino County Stormwater Program, 2013 WQMP Technical Guidance Document and include the Trash Order Implementation Plan requirements.
2.15 Any future maintenance and repair of sewer laterals, except for the portion of lateral located within the public right-of-way or public easement, and domestic water or fire service laterals to the project site shall be the sole responsibility of the applicant/property owner in accordance with City Code, Chapter 13.04.175 and 13.12.150.
2.16 Convey ownership of all onsite water wells that may exist to the City and convert to monitoring wells as directed by the City’s Public Works Environmental staff and Water Utilities Supervisor.
Prepare and record any necessary easements to provide the City with access to the monitoring wells. Any existing water wells that cannot be feasibly converted to monitoring wells shall be destroyed (per City Standard No. 465).
2.17 City staff shall determine the type of water (potable or recycled) to be used for grading operations, dust control activities, and common area/public landscape irrigation at the time of permit issuance.
2.18 All public street corners shall have a minimum curb radii per City Municipal Code, Chapter 19.06 and City Standards and Specifications.
2.19 Provide adequate sight distance (per City Standard No. 865) for each project driveway and at all intersections. Landscaping type and height shall be maintained to ensure sight distance requirements are perpetuated.
2.20 Submit to the City electronic files, in Adobe Acrobat PDF format, of all submittals, including reports, studies, improvement plans, and City redlines of previous submittals. Include AutoCAD and Esri GIS shape files as an e-transmitted zip file of all approved improvement plans.
2.21 The developer shall be responsible for the modification of traffic signals at the Fern Ave & Schaefer Ave and Euclid Ave & Schaefer Ave intersections. During construction, the developer shall be responsible for any damages attributed to the construction of related public improvements and shall coordinate with the Transportation Division and the City’s designated traffic signal maintenance company for technical support of the traffic signal during construction until such time as the City accepts the improvements to the satisfaction of the City Engineer.
2.22 Comply with all requirements of the Traffic Impact Analysis (TIA) dated June 13, 2024 including participation in fair share contributions and construction of required improvements and mitigation measures as shown on the Mitigation Monitoring and Reporting Program, to mitigate impacts.
2.23 Provide an addendum to the City of Chino’s Master Plan of Drainage (MPD) to include the proposed storm drain line that is required for this project, which will connect to the City’s existing storm drain line under System 82. Include an analysis of cost impacts to the system and provide updated system drawings to “slip sheet” them into the MPD.
3.0 PRIOR TO REQUEST AND RELEASE OF ANY OCCUPANCY PERMITS:
3.1 Construct and secure Public Works Department approval of all public facilities enumerated under Section 2.8 above (per Resolution No. 88-23).
3.2 Underground all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Municipal Code, Chapter 13.32.
3.3 Distribute for signature of all buyers, the information and disclosure notice announcing that the development will be annexed to the City's Landscape and Street Lighting Maintenance Assessment District before transfer of property title and completion and acceptance of all public improvements. 849
PL22-0075 (SA) & PL24-0080 (TM 20634) 8 May 14, 2025
3.4 Distribute for signature of all buyers, the information and disclosure notice announcing that the project property will be subject to an annual special East Chino Specific Plan area Community Facilities District Tax.
3.5 The applicant’s Civil Engineer shall field verify that all BMPs are designed, constructed, and functional in accordance with the approved WQMP. BMPs shall also be inspected by Public Works Environmental staff. Coordinate inspection with staff and submit a completed City of Chino BMP field verification form for review and approval.
3.6 Rehabilitate all street pavement impacted by utility trench repairs as directed by City staff. Install signing and striping per approved plans.
3.7 Provide and record a reciprocal use and maintenance agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.
3.8 Pay all remaining applicable fees pursuant to City Municipal Code.
4.0 PRIOR TO FINAL ACCEPTANCE/PROJECT CLOSEOUT:
4.1 Complete all Conditions of Approval listed under Sections 1-3 above.
4.2 Submit to the City a letter from the surveyor indicating monuments required for the map have been set and they have been fully paid for their services.
4.3 Submit to the City, electronic files of Tract/Parcel Map and “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an e-transmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.
850
Rev. 5/14/2025
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
DEVELOPMENT ENGINEERING DIVISION
PROJECT NO. PL22-0075 (SA) & PL24-0080 (TM 20634)
PROJECT ENGINEER: Isidro Abreo
DATE: 5/14/2025
A COPY OF THIS CHECKLIST MUST BE PROVIDED ALONG WITH A COMPLETED PLAN CHECK REVIEW APPLICATION TO THE
ENGINEERING TECHNICIAN WHEN MAKING AN APPOINTMENT FOR FIRST PLAN CHECK SUBMITTAL Copy of Development Engineering Division Conditions of Approval Plan Check Fee Calculation Form
Maps (Subdivision Only)
Preliminary Title Report (no older than six months) (Subdivision Only) Closure Calculations (Subdivision Only)
Referenced Maps (Subdivision Only)
Preliminary Soils Report (no older than sixty days)
Lot line adjustment certificate
Lot merger
Right-of-way dedication
Rough Grading Plan
Precise Grading Plan
Storm Drain Plan- New public storm drain line on Schaefer Ave Hydrology and Hydraulic Calculations with Backup Data (Signed and Sealed by a Registered Civil Engineer)
Engineering Cost Estimate (On City Forms) with Engineer’s Wet Signature and Stamp Street Improvement Plan
Cross-sections (if street plans are required) at 50’ intervals and extended a minimum of 100’ beyond the limits of improvements
Sewer Plan- Revise record drawings to add the sewer service lateral and monitoring manhole Domestic Water Plan- Revise record drawings to add the water service laterals and meters Street Light Plan
Voltage Drop Calculations (Signed and Sealed by a Registered Engineer) Signing and Striping Plan
Traffic Signal Interconnect Plan- Euclid Avenue
Traffic Signal Plan- New signal plan for ‘New Driveway’ and Schaefer Ave Traffic Signal Mod Plan- Revise existing signal plan for Fern Ave & Schaefer Ave Traffic Signal Mod Plan- Revise existing signal plan for Euclid Ave & Schaefer Ave Water Quality Management Plan
Construction Management Plan
851
Special Districts Leadership Foundation - District of Distinction Since 2008 May 13, 2025
It is a recommendation of the Fire District that the developer of every new construction project facilitate a preconstruction meeting. The meeting is to be scheduled with the Fire District Inspector for said project.
The following are the conditions of the above referenced permit/project. All conditions shall be adhered to, failure to comply with said conditions may result in the revocation of said permit and/or punitive fines as outlined in the Fire District fee schedule.
We look forward to a cooperative working relationship throughout the project. Should you have any questions regarding the project, including the conditions as set forth herein, please feel free to contact our office at (909) 902-5280.
1.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO RECORDATION:
1.1 Fire access roads shall be designed and plans submitted to the Fire District for approval.
Fire access roads shall be constructed of an all-weather hard surface, such as, asphalt or concrete, and be a minimum unobstructed width of 26 feet and minimum clear height of 13’6”. The road grade shall not exceed twelve percent (12%) maximum. An approved turn around shall be provided at the end of each roadway in excess of 150 feet in length. Aerial access shall be provided for any buildings 30’ ft. and higher per 2019 CFC. Appendix D. A 26’ ft. wide access road shall be a minimum of 15’ ft. to the building and a maximum of 30’ ft. from the building. Access roads shall comply with Fire District Standard No. 111.
Chino Valley Fire District
14011 City Center Drive
Chino Hills, CA 91709
(909) 902-5260 Administration
(909) 902-5250 Fax
Chinovalleyfire.org
2022-00003067
Fire Protection Requirements
CLARK SCHAEFER PARTNERS, LLC
280 NEWPORT CENTER DR STE 240
NEWPORT BEACH, CA - California 92660
Project Name: ORBIS COMMERCIAL
PL22-0074-0075, PL23-0111, PL24-0080-0081
Project Address: NW CORNER OF EUCLID &
SCHAEFER AVE, Chino, CA. 91710
Board of Directors
Harvey Luth
President
Sarah-Ramos Evinger
Vice President
John DeMonaco
Tom Haughey
Mike Kreeger
Fire Chief
Dave Williams
852
Special Districts Leadership Foundation - District of Distinction Since 2008
1.2 The development and each phase shall have two (2) points of vehicular access during construction. Fire District Standard No. 111 shall be complied with.
1.3 Water systems shall be designed to meet the required fire flow of this development and be approved by the Community Risk Reduction Division. Buildings in excess of 100,000 square feet shall have a minimum of two (2) connections to a public main. The developer shall furnish the Community Risk Reduction Division with three (3) copies of the water system working plans done by the installing contractor for approval, along with the Fire Flow Availability Form completed by the water purveyor prior to recordation. The required fire flow shall be determined by using the California Fire Code, current adopted edition. For all private systems, the water systems shall comply with Fire District Standard Nos. 101, 102, and 103. In areas without water-serving utilities, fire protection water systems shall be based on NFPA Pamphlet 1231. For water connections and work conducted in the public right of way, please refer to separate plans reviewed and approved by the water purveyor.
1.4 Fire hydrants shall be six-inch (6") diameter with a minimum one four-inch (4") and one two and one-half inch (2-1/2") connections. All fire hydrants shall be spaced a maximum of three hundred feet (300') apart. Private water systems shall comply with Fire District Standard Nos. 101, 102, and 114. All hydrants shall be installed with pavement markers to identify their locations.
1.5 Access drives which cross property lines shall be provided with CC & R's, access easements or reciprocating agreements and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.
1.6 Underground fire mains which cross property lines shall be provided with CC & R's, easements, or reciprocating agreements addressing the use and maintenance of the mains and hydrants and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.
2.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMIT:
2.1 Fire access roads shall be constructed and approved by the Community Risk Reduction Division prior to combustibles being brought onto the site.
2.2 Approved street signs shall be installed prior to issuance of building permits, as well as a job site address.
2.3 Fire Protection water systems shall be tested, operational, and approved by the Community Risk Reduction Division prior to combustible materials being brought to the site.
2.4 All flammable vegetation shall be removed from each building site for a minimum distance of thirty feet (30') from any flammable building material including all structures. 853
Special Districts Leadership Foundation - District of Distinction Since 2008
2.5 A detailed site plan of the development is required to be submitted in electronic (pdf.) format. The plan must show and be limited to: locations of property lines, buildings, and equipment and hazards for emergency response purposes. Please refer to Fire District Standard No. 143. Additional or revised files may be required during construction and/or prior to final signoff.
2.6 The Developer shall submit, as an electronic file, a drawing of the new streets in pdf format to the Fire District with the building construction plans. Format must contain and be restricted to the following layers: A. Right of way; B. Parcel Lines; C. Street Names; D. Address numbers; E. Fire Hydrants. Additional or revised files may be required during construction and/or prior to final signoff.
3.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO OCCUPANCY:
3.1 An automatic protection fire sprinkler system is required for all buildings 5,000 sq. ft or greater. and/or when used for allowable area increase, if applicable. This system shall comply with NFPA Standard No. 13 and Fire District Standard No. 110. An electronic/PDF set of detailed plans along with hydraulic calculations and material specifications shall be submitted to the Community Risk Reduction Division. The system shall be installed, tested and approved prior to system final. Fire sprinkler systems shall be installed by a licensed C-16 contractor and the contractor is required to submit a report to The Compliance Engine (TCE).
3.1 A residential "life safety" fire sprinkler system is required. The developer shall submit an electronic/PDF set of detailed plans and hydraulic calculations to the Community Risk Reduction Division for approval. The system shall be installed, tested and approved prior to occupancy. The system shall meet the standards of NFPA 13R or 13D and Fire District Standard No.126. Dwellings in excess of 5,000 square feet shall provide calculations of the (4) four most remote sprinkler heads. For NFPA 13R systems, the contractor is required to submit a report to The Compliance Engine (TCE).
3.2 An automatic fire alarm system is required. An electronic/PDF set of detailed plans shall be submitted showing the design, system components, signaling devices, fire alarm power supply, control panel and auxiliary devices and functions of the alarm system. Please refer to Fire District Standard No. 133 and current adopted editions of the California Building Code, as well as NFPA Standard 72. The contractor is required to submit a report to The Compliance Engine (TCE).
3.3 Approved in-building, two-way emergency responder communication coverage for emergency responders shall be provided in all new buildings, if ERRC evaluation determines the need for installation of system. In-building, two-way emergency responder communication coverage within the building shall be based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. System shall comply with current adopted edition of the California Fire Code, NFPA 70, 72 & 1221 and the contractor is required to submit a report to The Compliance Engine (TCE).
3.4 An automatic fixed fire extinguishing system may be required. An electronic/PDF set of detailed plans shall be submitted to the Community Risk Reduction Division for approval. 854
Special Districts Leadership Foundation - District of Distinction Since 2008 System shall comply with current adopted edition of the California Fire Code, NFPA Standard 17-A, and UL 300. Please refer to Fire District Standard No. 112. The contractor is required to submit a report to The Compliance Engine (TCE).
3.5 Insulated liquid carbon dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with CFC, Section 5307.3.1., and shall be provided with mechanical ventilation or a gas detection system. The contractor is required to submit a report to The Compliance Engine (TCE).
3.6 A maximum occupant load sign shall be posted in a conspicuous location neat the main entrance/exit of the room, if occupant load is greater than 49 people. Such sign shall be legible.
3.7 Hand-held portable fire extinguishers are required to be installed. The location, type and cabinet design shall be approved by the Community Risk Reduction Division.
3.8 Smoke and Carbon Monoxide alarms are required to be installed per Section 310 of the California Building Code, current adopted edition. Locations shall be in accordance with code requirements.
3.9 Exits, doors, signs and approved path marking shall be installed in accordance with the current adopted edition of the California Building Code, Section 1007
3.10 "No Parking - Fire Lane" signs shall be installed in interior access drives at locations designated by the Community Risk Reduction Division. Curbs shall be painted red at locations designated by the Community Risk Reduction Division. Please refer to Fire District Standard No. 121.
3.11 An approved recessed Fire Department "KNOX" brand key box is required. The key box shall be located at or near the main entrance(s), and shall be provided with a tamper switch and shall be monitored by an approved central station monitoring service. Please refer to Fire District Standard No. 117.
3.12 An approved Knox key switch and/or Knox lock is required on each automatic electric or manual gate that crosses an EVA. All automatic gates shall be provided with a manual override. Fire District Standard No. 116 & 117 shall be complied with.
3.13 Commercial, industrial, and multi-family building addresses shall be posted with a minimum eight inch (8") numbers, visible from the street and during the hours of darkness they shall be internally or externally electrically illuminated. Posted numbers shall contrast with the background used and be legible from the street.
Where building set back exceeds 100 feet from the roadway, additional non-illuminated six inch (6") numbers shall be displayed at the property access entrance. These numbers shall also contrast with the background used. Fire District Standard No. 122 must be complied with.
3.14 Residential street addresses shall be posted with a minimum of four inch (4") numbers, shall be electrically illuminated (by 12-volt power source only) by internal means during the hours of darkness. Posted numbers shall contrast with the background used and be 855
Special Districts Leadership Foundation - District of Distinction Since 2008 legible from the street in accordance with the California Fire Code, current adopted edition. Where building is set back more than 100 feet from the roadway, additional nonilluminated four inch (4") numbers shall be displayed at the property access entrance.
These numbers shall also contrast with the background used. Please refer to Fire District Standard No. 122.
3.15 An electronic/PDF set of plans shall be submitted separately for each of the following listed items to the Fire District for review, approval and permit prior to any installation or work being done. Approved plans must be maintained at the worksite during construction. Fees are due at the time of submittal.
a) Building Construction, includes tenant improvement work b) Private (onsite) Underground Fire Protection Water Systems, if applicable c) Fire Sprinkler Systems, designed by C16 contractor or registered engineer d) Fire Alarm Systems or Sprinkler Monitoring Systems designed by a C7, C10 contractor or registered engineer.
e) Knox box and/or security gate locations.
f) Gas detection systems
g) Emergency Responder Radio Coverage Systems
Applicable Standards:
101, 102, 103, 110, 111, 114, 117, 121, 122, 126, 133, 141, 143 CVFD Standards available online at http://www.chinovalleyfire.org 856
POLICE DEPARTMENT
CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
1.0 GENERAL REQUIREMENTS:
1.1. FLOCK cameras shall be installed and adequately positioned to cover main entrances and exits to the property (Schaefer and Euclid Avenues).
1.2. Install and adequately position license plate reader quality security cameras capable of capturing nighttime video to cover door entrances (directed towards faces), rear of the properties, parking lots, entrance and exit to residential parking structure, and safe storage locations with 24/7 monitoring. Consider private security during nighttime/early morning hours. Allow access to camera system to our Real Time Crime Center Analysts for in progress calls for service/crimes in progress. Contact Leah Green Chino PD (909-334-3060).
1.3. *A CPTED (Crime Prevention Through Environmental Design) inspection can be scheduled to assist with recommendations on camera placement for best coverage.
857
858
859
Subject: Appeal No. 1 - Objection to and Appeal of the Mixed-Use Development by Applicant Orbis Schaefer LLC. Special Condition Use Permit for Storage Facility Should be Denied.
To: All Members of the City Council
Warren Morelion, Director of Development Services
The following objections and appeal of Planning Commission’s decision to approve the Permit Applications under PL22-074; PL22-0075; PL24-0080, and PL22-0081 is being submitted to the City Council in opposition to the building of a storage facility in the proposed Orbis Development on the 10.52 acre parcel having APN 1052-581-03 (Eden Development). The appeal is being submitted under the provisions of Chino Code of Ordinances, including Title 20, Zoning, Section 20.23.150.
OBJECTIONS TO THE STORAGE FACILITY – ORBIS/SCHAEFER DEVELOPMENT The issuance of a special use conditional permit is discretionary and not required. It should be determined on a case-by-case basis. The Planning Commission’s approval of the special conditional use permit for the proposed Orbis development should be overturned and denied and application to build a storage facility should not be permitted.
Zoning laws regulate land uses in two basic ways. Some uses are permitted as a matter of right if the uses conform to the zoning ordinance. Other sensitive land uses require discretionary administrative approval pursuant to criteria in the zoning ordinance. (§ 65901.) They require a conditional use permit. (See Cal. Zoning Practice, supra, § 7.55 et seq.) The reason for discretionary treatment is that these are uses which "cannot be said to be always compatible in some zones while always incompatible in others .... uses that should not be allowed as of course, but could be allowed subject to conditions ...." (Gaylord, Zoning: Variances, Exceptions and Conditional User Permits in California (1958) 5 UCLA L.Rev. 179, 193.) [1] "[T]he traditional purpose of the conditional use permit is to enable a municipality to exercise some measure of control over the extent of certain [156 Cal. App. 3d 1184] uses, such as service stations, which, although desirable in limited numbers, could have a detrimental effect on the community in large numbers." (Van Sicklen v. Browne (1971) 15 Cal. App. 3d 122, 126 [92 Cal. Rptr. 786].) (See Neighborhood Action Group v. County of Calaveras (1984) 156 Cal.App.3d 1176.) The inclusion of the storage facility will be in conflict with, including but not limited to, the following sections of the City of Chino Zoning Code:
Section 20.01.020(B)(1)(2)(4)(5) & (6); and
860
Section 20.23.080(F)(2)(a)(b)(c)(d) & (e); and
Section 20.23.080(G)(1)(2)(4)(5) & (6).
The city has also failed to ensure that it adequately promotes citizen participation and assistance in the zoning code per Section 20.01.020(B)(11) and that our city leaders promote a responsive and accountable city government under Section
20.01.020(B)(10).
OBJECTIONS
Wherein the city updated the zoning code at § 20.09.090.E.4, which requires a special conditional use permit for a storage facility within a mixed-use overlay district, neither the planning commission or the city council has heard or approved for a storage facility to be built in the Eden Development. There was and is no lawful agreement in place or made with the developer (Orbis) that a predetermined approval for this particular storage facility to be built on the property was ever made. It would be a violation of state law (including Gov Code § 65905) and our local zoning code (including Section
20.23.080) for the city to prejudge the storage facility permissibility. The fact that storage facility are subject to conditional approval, does not equate to Orbis having a predetermined and an absolute right to construct a storage facility at the Eden development location.
Mass and Scope: The mass and scope of the Orbis development is too concentrated for the surrounding neighborhood. The proposed 264 (264 units divided by 9.82 acres =
26.88 units rounded up to density of 27 units per acre). These 264 apartment units are planned to be concentrated and squeezed into only an approximate 5.02 acre subdivided lot. The 264 units should be spread out on the 9.82 acre site and the limited acreage not be used for a storage facility. Building all 264 units on a 5.02 acre lots equates to 52.6 units per acre. This jam-packed density is objectionable and is incompatible with the character of the neighborhood. The inclusion of the storage facility only adds to the high density of box-like buildings of excessive height in the development. At a minimum, having a density of 52.5 units per adjusted gross acre on a 5.02 acre lot, with an enormous storage facility taking up other valuable available land space, will be detrimental to the public welfare or injurious to property or improvements in the neighborhood. The property should not be used for the storage facility, but should be used to spread out and to lower the height of the apartment building. The property, in lieu of the storage facility, could also be used to create greater space for parking or open outdoor space. The project as proposed is environmentally illdisposed as it will create excessive traffic during prime time driving periods, crowd too many people into a small area of the city, and destroy the scenic, rural small-town nature of east Chino. The proposed storage facility is not essential or desirable to the 861
public convenience or welfare of the citizens who reside in the area and is in conflict with the general plan and specific plans for the area.
In issuing its findings of fact, the City Council should explain how and why the inclusion of the storage facility is, or is not, compatible and beneficial to the neighborhood and why it is necessary under the reasons promoted by the city leaders for the passage of Measure Y.
Fails to Protect and Promote, Health, Safety, Welfare, and Enhance the Value of Surrounding Residential Property: The project is in conflict with the general plan, including - The Vision of Chino is to be vibrant, safe city with a small-town feel and character. The Community Character Element is to preserve and enhance the character of the existing residential neighborhoods. Land use standards include that neighborhood commercial designation in intended to accommodate such uses as drug stores and a variety of smaller shops.
The storage facility should be removed from the development as it fails to protect and promote the health, safety and welfare of Chino residents. It will not protect or enhance the value of surrounding residential property. By having nearly 8% of the 3,662 housing units from the RHNA allocation (planned MUO affordable housing units of 1,284 low income units plus the RHNA required above moderate income of 2,378 units for the entire city) built on only a 5.02 acre lot will not promote an environmentally sustainable pattern of development in east Chino. There are approximately 18,938 acres in Chino, putting nearly 8% of its proposed RHNA Mixed-Use Overlay Affordable Housing in a such a miniscule area (5.02 acres) is not conductive to the health, safety and welfare of Chino residents. A conditional permit can be denied if it is argued to be detrimental to the public welfare or injurious to property or improvements in the neighborhood. (See Hawkins v. County of Marin (1976) 54 Cal.App.3d 586).
In issuing its findings of fact, the City Council should explain how and why the inclusion of the storage facility is, or is not, compatible and beneficial to the neighborhood and why it is necessary under the reasons promoted by the city leaders for the passage of Measure Y. The quality of life and character of the existing residential neighborhood will be ruined by the inclusion of an atrocious box-like four story storage facility. The scenic views and aesthetics of the surrounding neighborhood and the main focal point and gateway to East Chino will be damaged.
Incompatible with Government Code § 65583.2(c)(2)(B): The parcel at Fern/Schaefer/Euclid has a gross acreage of 10.52 acres. HCD uses gross acreage for SDBL standards. The city has failed to comprehend that the State of California has explicitly declared that parcels over ten acres should not be used for affordable housing under RHNA standards. Government Code, Section 65583.2(c)(2)(B) reads: “A site larger than 10 acres shall not be deemed adequate to accommodate lower 862
income housing need unless the locality can demonstrate that sites of equivalent size were successfully developed during the prior planning period for an equivalent number of lower income housing units as projected for the site or unless the locality provides other evidence to the department that the site can be developed as lower income housing.”
The city has never provided adequate evidence to the public as to how 264 units can be built on 5.02 acres, or even evidence on how the 264 units on a 9.82 acre site is deemed adequate to accommodate such high density housing in such a miniscule area of the city. Furthermore, when the 3 plus acre site just north and adjacent to the Orbis project is developed, it will add approximately 80 more units to this tiny area of the city.
It was ill-advised that the city choose to place such high density housing in a site that cannot accommodate such negative impact on the surrounding neighborhood, particularly when there is no available on-street parking in the development area. Onstreet parking is prohibited on the surrounding streets of Fern, Schaefer and Euclid. The proposed storage facility should be denied as it just adds to the negative impact of the development. Also, there is inadequate public transportation in the area. There is only one scheduled bus (OmniTrans Route 83) every 30 to 60 minutes on Euclid. The need for parking and public transportation for the residential and commercial uses during primetime commuting hours will have a negative impact on traffic and parking in the immediate area. The inclusion of an approximate 50 foot tall monstrous four story storage facility will not resolve, but will aggravate the excess and high density development that is inadequate to accommodate lower income housing needs for the city. The storage facility will further exacerbate the ill-advised and reckless decision to use this site to satisfy HCD default density option. There is sufficient sites to satisfy the RHMA default density option as documented in the 6th Cycle Update (an average density of only 25 units per acre within the Mixed-Use Overlay which have been adjusted by a factor of 0.8 (80%). (see 6th Cycle Update, pages B-30-31 and Table B-6).
In issuing its findings of fact, the City Council should explain how and why the inclusion of the storage facility is, or is not, compatible and beneficial to the neighborhood and why it is necessary under the reasons promoted by the city leaders for the passage of Measure Y.
Storage Facility Will Not Create a Desirable High Quality Neighborhood: The enormous storage facility building will not create a desirable high quality development surrounding a residential neighborhood. Chino’s vision in its Housing Element is for the city to maintain the feel of a rural small-town community will be devastated. The quality of life and character of the existing residential neighborhood will be ruined by the inclusion of an atrocious box-like four story storage facility. Additionally, prior to the hastily and ill-advised changes to the zoning code (during only a two week period between March 6 and March 20, 2023), storage facilities were not permitted to be built 863
within the East Chino Specific Plan (see pages 94 and 97 of East Chino Specific Plan, City of Chino, 9/02). Such public storage facilities were deemed to be incompatible and conflicting with the character of the residential neighborhood. Between March 6 and 20, 2023, the revision to the zoning code under subsection 20.09.090.E.4.d, allowed for the maximum floor area for public storage facilities on a site shall not exceed twenty-five percent of the gross floor area for all residential and non-residential uses. The Planning Commission should clarify how this 25% figure was obtained and how it is compatible with having such a large amount of space to be used for purposes other than affordable housing. Since December 5, 2024, a Public Records Act request concerning the basis of the floor are ratio for the determination of floor space usage has not adequately provided for inspection on how such methodology was determined.
In issuing its findings of fact, the City Council should explain how and why the 25% gross floor area for a storage facility was determined. The Commission should also explain how the inclusion will create a desirable high quality neighborhood.
Project Building Heights are in Conflict with Prior City Workshops: On January 17, 2023, the city held a workshop to review and provide feedback on several key policy questions related to the AHO and MUO and associated development standards. The city council, led by the mayor, held that an additional building height (up to additional one story) should be permitted where necessary to achieve greater density while also providing adequate open space and recreational amenities. It should also be noted that the base density discussed in the workshop held that the overlays should have a base density starting at 20 du/ac and be eligible for increases in allowable density up to 30 du/ac in exchange for a greater share of affordable units. It was not discussed during the workshop that the minimum density was to be increased to 26 du/ac and that a lower percentage of affordable housing would be permitted. The inclusion of storage facilities, taller building heights and increased minimum density levels were not discussed when the city was advocating for the passage of Measure Y. During this workshop, the mayor and the council choose to allow a four story apartment building to allow for more open space (see January 17, 2023 workshop video between 1 hour 11 minutes and 1 hour and 22 minutes). However, the mayor when suggesting an increase to 4 stories, cautioned that the four story buildings should not be next to residential areas as not to impose on the neighborhood. The Orbis development is in conflict with the vision of the city council as expressed during the January 17 workshop.
In its March 6, 2023 letter, Orbis requested the city to implement a 55 foot restriction on building heights to allow in part for an increased opportunity on ground floor retail usage. However, the development as proposed has not used that requested ability to construct any vertical built usage on the property. Should the city allow the storage facility, it should be vertical built above the 13,800 square foot retail building. The city has the ability to approve, deny or alter the plan for the conditional option. The three 864
story vertical building with the storage units on top would allow 1.5 acres of open space to be used for other purposes, such as lowering the mass and scope of the apartment complex, or create more parking spaces. A storage facility built vertically above the retail building would be more than sufficient to accommodate the expected use by renters in the apartment complex.
The additional higher density caused by the inclusion of the storage facility is not compatible to information made public prior to March 20, 2023. No where was it discussed during the workshop or prior to March 20 that storage facilities would be allowed in overlay districts that were being created to allow for affordable housing. It is hypocritical and disingenuous for the city to now allow a monstrous storage facility on the property that is not providing open space or recreational amenities and is squeezing RHNA allocations into a small 5.02 acre lot having an actual density of 52 units per acre. Measure Y was passed to allow affordable housing to meet RHNA default density standards, not to allow storage facilities surrounded by residential neighborhoods..
It was not until the planning commission meeting of March 20, 2023, when the Orbis requested inclusion of the storage facility was made public and that a revised recommendation by city staff had been made. The amended revisions to Section
20.09.090 of the zoning code allowed for the inclusion of storage facilities. Also added to the zoning code not previously made public was a change in the normal maximum building height from 45 to 50 feet within a MUO district. Again the public was not provided acceptable advance tangible notice of an increase in the allowable building heights to be as high as 55 feet under note 2 of Exhibit 20.09-7 were to be allowed.
There was also a dramatic change in the density level from 20 to 30 units per acre to a minimum of 26 units per acre with a sizable reduction in affordable housing percentages. The storage conditional use permit should be denied as it would allow the heights of other buildings in the project to be lowered.
In issuing its findings of fact, the City Council should explain how and why the inclusion of the storage facility is, or is not, compatible and beneficial to the neighborhood and why it is necessary under the reasons promoted by the city leaders for the passage of Measure Y.
Questionable and Suspicious Financial Feasibility Report: There is also a dubious financially feasibility of mixed-use overlay districts that was revised with last minutes changes between March 6 and March 20, 2023. This questionable report allowed for a higher density (26 du/ac) then what is cited in the general plan under the 6th Cycle Housing Element Update (20 to 30 du/ac). The public was provided only minimum notice of these changes without an effective opportunity to have appropriate input or objection. It is argued that the city failed to abide by the standards of Section 865
20.01.020(B)(11) as it did not promote citizen participation and assistance in issues that the public was never informed of before voting for Measure Y or communicated during previous public workshops. The changes were the result of private communications between the developers and planning division staff prior to the planning staff making a recommendation to the planning commission without the community having an effective voice in the outcome. Not only were density restrictions altered; higher building heights and the inclusion of the storage facility was allowed to be amended based upon a letter from Orbis that was not disclosed to the public until a few days before the March 20, 2023 planning commission hearing.
How is now adding the storage facility to an already highly dense residential complex making it compatible and harmonious with the neighborhood? How is adding the storage facility adding open space? The city has a responsibility to be responsive and accountable to it citizens in formulating and explaining the effects of the zoning code.
In issuing its findings of fact, the City Council should explain how and why the inclusion of the storage facility is, or is not, compatible and beneficial to the neighborhood and why it is necessary under the reasons promoted by the city leaders for the passage of Measure Y.
Loss of Sales Tax Revenue: The storage facility will also not generate sales tax revenue. The storage facility will negatively affect the general welfare of all citizens of Chino. Prior to the inept inclusion of the storage facility on March 20, 2023 by the planning commission which came before the city council for adoption two weeks later, the property was zoned as Commercial/General (C/G). The C/G designation was intended to meet the daily and occasional shopping needs of Chino residents. The Orbis acreage was not zoned to allow for a storage facility to be built on the property.
Also of critical importance was the C/G zoning was purposely intended to generate sales tax revenue that would go into city’s coffers to be used for the general welfare of the citizens of Chino.. The inclusion of the storage facility will not generate sales tax revenue. This will negatively impact the general welfare of the city’s residents.
It is not compulsory; it is discretionary for the storage facility to be allowed to be built in the Orbis project. The city needs to listen to the objections of its citizens. The citizens were not adequately informed of the back-door communications between the developers and the city’s development and planning staff in making the misguided and foolish changes to the zoning code that occurred within a two week period in March of 2023. The city planning staff had already made the recommendation to adopt the illadvised zoning changes allowing for the inclusion of storage facilities prior to the public hearing held before the planning commission on March 20, 2023. There had been numerous workshops held over an 18 month period, wherein the inclusion of the storage facility was never discussed in public meetings or postings for the proposed 866
Mixed-Use Overly districts. It is time for our city leaders to listen to its citizens and not the developers who are only out to enrich their profits. The City of Chino should be supporting its citizens participation and assistance, rather than ignoring their objections to the storage facility. The citizens of Chino depends upon its city government to represent the community and not the profit driven developers.
Should the Orbis development special conditional permit go before the planning commission for approval under its quasi-judicial capacity, it is requested that the planning commission issue findings of fact, citing the legal and factual foundation on which the planning commission made its particular decisions It is also requested and expected that the findings of facts should deliberate on the following standards of the zoning code:
Section 20.01.020(B)(1)(2)(4)(5) & (6); Section 20.23.080(F)(2)(a)(b)(c)(d) & (e); and Section 20.23.080(G)(1)(2)(4)(5) & (6).
The denial of the conditional use permit in this case would not prohibit the proposed business within the City of Chino, but only denied the use of the land in question for the storage facility. (See Snow v. City of Garden Grove (1961) 188 Cal.App.2d 496.) It is requested and compulsory that City Council’s zoning decisions include findings of fact based on substantial evidence, meaning the findings must be supported by relevant and competent evidence in the record bridging the gap between raw evidence and the final decision. The Council should clearly explain how their actions align with the local general plan, zoning ordinances, and state statutes.
The inclusion of the storage facility in the Orbis project should be denied or significantly altered to a much smaller, vertically built building over the commercial retail/dining building.
Sincerely,
Robert Nigg
867
Date: May 20, 2025
Subject: Appeal No. 2 - Objection to and Appeal of Zoning Code for the Mixed Use Development; Tentative Tract Map under PL24-0080
To: All Members of the City Council
Warren Morelion, Director of Development Services
The following objections and appeal of Planning Commission approval of the Tentative Tract Map No 20634, under PL24-0080; and in conjunction with Special Conditional Use Permit PL22-074; Site Approval PL22-0075; and Special Conditional Use Permit PL22- 0081 is being submitted to the City Council in opposition to the proposed Orbis Development subdividing the 10.52 acre parcel having APN 1052-581-03 (Eden Development).
This appeal is being submitted under the provisions of Section 19.01.110.B of the Chino Zoning Code. The following objections and appeal of Planning Commission’s decision to approve the Tentative Tract Map is being submitted to the City Council in opposition to the proposed Orbis Development subdividing the 10.52 acre parcel into 5 separate lots.
Objections are made based upon the following standards of law under Government Code Section 66474 and Chino Zoning Code Section, 19.02, including Subsection
19.02.080.
A full hearing required under Subsection 20.23.150.A.2 was requested. The recommendations in the May 21, 2025 memorandum, approved by the Director of Development Services, scheduled to be heard under Agenda Item No.3 before the Planning Commission, failed to acknowledge or address the objections raised by the citizens of this project, including those of this applicant.
Numerous citizens of Chino, after the neighborhood meetings, requested thru the city website for this project, to be notified of all updates on the project. The Memorandum dated May 21, 2025 heard before the planning commission was deficient as it contained no proposed tract maps drawings. The agenda packet which was to satisfy the 72 advance notice requirements of the Brown Act, did not contain the diagrams of the subdivision of the 10.52 acres lot into five separate lots. Since citizens did not have a opportunity for public inspection of the maps, a violation of Government Code § 54954.1 was alleged to have occurred. Therefore, the May 21, 2025 Planning Commission decision was improperly decided. The public hearing on the tentative tract map was not continued until after lawful public notice has been made.
Additionally, the subdividing of the property was never discussed at the prior public or community meetings. Applicant had numerous verbal discussions with the Planning Division, including with the Director, and no mention of these objections to the 868
subdividing of the property was included Memorandum before the Planning Commission. The Commission should have been informed of the concerns raised during the review process to make an informed decision on whether to approve the tentative tract map. The legal requirements under Subsection A.2 required that the Director shall prepare the record before the planning commission on the subject matter of the appeal, including reports, memos and meeting notes, and transmit same to the planning commission. The director of community development shall also prepare a written response to the appeal statement. The May 21, 2025 memorandum in the agenda packet was deficient has it contained no proposed tract maps, no acknowledgement or responses to the project objections as raised by the applicant, Robert Nigg, and the other citizens of Chino. Therefore a full hearing was required after the Director prepared the necessary record.
The Tentative Tract Map should be denied or the project be revised to satisfy the standards of the state density bonus law.
(a) The proposed Tentative Tract Map is Not Consistent with Applicable General and Specific Plans as Specified in Section 65451 of the Government Code
It is argued that the tentative tract map is deficient and does not satisfy the requirements of Section 65451. There is insufficient evidence the subdivision will provide implementation of measures to ensure the development will be consistent with the general and specific plans, including regulations, programs, public works projects, and financing measures necessary to carry out the requirements of paragraphs (1), (2), and (3) of Subsection (a) of Section 65451 including:
(1) The extent of the uses of land, including open space, within the area covered by the plan. Insufficient open space, setbacks, and extreme density are not compatible with the general and specific plans for the Orbis development. (2) The proposed distribution, location, and extent and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, and other essential facilities proposed to be located within the area covered by the plan and needed to support the land uses described in the plan. The proportion and extreme density of over 50 units per acre on a lot will create additional needed infrastructure, including sewer hookups, public transportation, water pressure, and parking. There is also insufficient information the developer will ensure a development agreement to pay for the financing measure to upgrade the infrastructure in the area will be completed and the citizens of Chino will not be paying for the necessary improvements. (3) Standards and criteria by which development will proceed has not been adequately established by the planning staff to ensure for each of the 5 subdivided lots to include if 869
there is suitable open space, adequate parking, necessary building setbacks, compliance to all zoning standards, and adequate local public transportation.
There is insufficient evidence and lack of a statement as to how the relationship of the development with implement the measures of the East Chino Specific Plan and to relationship to the of the specific plan to the general plan.
In issuing its findings of fact, the City Council should explain how and why the subdividing the property into 5 lots and the inclusion of the storage facility is, or is not, compatible with the city’s general plan, the zoning code, and state standards for affordable housing.
(b) The Subdivided Site Density Is Inconsistent with General Plan The subdividing the acreage into five lots is not consistent with applicable general and specific plans. The general plan of Chino per the 6th Cycle Housing Element Update (6th Cycle Update) allows up to 30 dwelling units per acre (30 du/ac), see Table 3-7 on page 3-12. (All page references are from the 6th Cycle unless otherwise noted.) Also see Table 20.09.5 of the Zoning Code. A density of over 30 units per acre should be denied by the planning commission unless the developer chooses to invoke the State Bonus Law (SDBL) under Government Code Section 65915.
The subdivision of 10.52 acre parcel into 5 lots with an approximate 264 units on an approximate 5.02 acre lot will equate to over 52 du/ac. This is not consistent with the general plan as the plan only allows up to 30 units per acre. The City also currently defers to California Government Code Sections 65915-65918 which establish the potential density bonuses for the development of affordable units. See pages 3-10 and 4-21 of the 6th Cycle Update. Under California Government Code Section 65915, SDBL, the density bonus is based on the units per acre allowed by local zoning standards, not the total site acreage.
Table 20.09-7 from the zoning code sets-forth the standards site requirements within the mixed-use overlay (MUO) for the density per lot. Zoning Code Table 20.09-5, also provides for the maximum allowable density (Units per Adjusted Gross Acre). Again, per the requirements of the zoning code, the maximum density per acre is 30 units unless the SDBL under Government Code Section 65915 is used by the developer.
In order to build over 30 dwelling units per acre on the subdivided property, Orbis could build 30 units with 13% allocated for low income housing at below market rate (BMR), then an additional 15 units (50%) under California state law AB 2345, adopted in 2020.
Under Table 3-4 of the 6th Cycle Update, an increase of only a 37% density bonus increase would require a 20% density bonus of 15 units. Gov. Code 95915 currently sets the limits for additional SDBL units at 50%. For a five acre parcel/lot, this would equate to approximately 225 units (45 x 5 = 225) with a required low income affordable 870
housing of BMR of 19.5 units (30 x 13% x 5); and a density bonus of 15 units (15 x 20% x 5) for a combined total of 34.5 units rounded to 35 total affordable housing units for a 5 acre lot. The proposed Tentative Tract Map should be denied unless Orbis develops approximately 225 units with 35 low income units on the subdivided lot of about 5.02 acres.
In issuing its findings of fact, the City Council should explain how and why the subdividing the property into 5 lots and the inclusion of the storage facility is, or is not, compatible with the city’s general plan, the updated housing element, the zoning code, and state standards for affordable housing.
(c) The Subdivided Sites Are Not Physically Suitable for the Type of Development.
Notwithstanding the additional density of 52 units per acre as discussed in subsection (a) above, the area is not suitable to handle the approximate 264 units on such a small acreage of property. Sufficient information has not been presented that the existing sewer, water, and dry utilities on Schaefer and Fern will be able to handle the connections of 264 units from such a small lot area and then also account for the further increased MUO uses on the approximate vacant 3 acre parcel just north of the proposed Orbis development (which could add another 80 or so units in this small geographic portion of the city).
Additionally, by subdividing the apartment complex into only a 5 acre lot, will limit the available on-site parking. There is no known shared parking agreement between the 5 acre apartment complex lot and the other 4 lots being proposed for only commercial use by the developer.
This incompatibility is exacerbated by the fact that there is also no nearby on-street parking for the high density of 264 units. Also, there is inadequate public transportation other than one OmniTrans Route 83 bus every 30 to 60 minutes on Euclid. The need for parking and public transportation for the residential and commercial uses during primetime commuting hours will have a negative impact on traffic and parking in the immediate area.
Additionally, under Zoning Code Section 20.09.090.G, Non-residential development (in a MUO district) shall comply with the standards of the base zoning district with which the MUO district is combined. The proposed storage facility of 132,438 square feet proposed to be built on an approximate 1.5 acre lot, results in a Floor Area Ratio of appropriately 2.02, which exceeds the maximum limits in the zoning code. Additionally, since the proposed subdivided lot for storage facility use will not include any residential units, the base zoning district for the Orbis project is the East Chino Specific Plan. The East Chino Specific Plan restricts the building of storage facilities within the plan area. 871
In issuing its findings of fact, the City Council should explain how and why the subdividing the property into 5 lots and the inclusion of the storage facility is, or is not, compatible with the development standards of Section 20.09.090 of the zoning code, including lot development standards, and how it satisfy the State Density Bonus Law requirements.
(d) The Subdivided Sites are Not Physically Suitable for the Proposed Density of Development.
The State of California, under Government Code Section 65583.2(c)(2)(b): “A site larger than 10 acres shall not be deemed adequate to accommodate lower income housing need unless the locality can demonstrate that sites of equivalent size were successfully developed during the prior planning period for an equivalent number of lower income housing units as projected for the site or unless the locality provides other evidence to the department that the site can be developed as lower income housing.” If the state deemed site larger than 10 acres was not adequate to accommodate the density of lower income housing needs, then squeezing in the density allotted for a 10 acre site into a 5 acre site only exacerbates the problem. HCD uses gross acreage for SDBL standards.
A city cannot claim a site over 10 acres only represents a minimal percentage of the city's total regional housing needs allocation (RHNA) to validate the site without providing further evidence that the site is suitable for such a high density low-income housing development. Sites larger than 10 acres are subject to more scrutiny and require specific justification to demonstrate their suitability for accommodating lowerincome housing needs. The city has not provided any other evidence how the site is suitable for such a large number of low-income housing units. Just an unsupported statement that 264 units only represents a minimum percentage of RHNA allocation is not supported by the verifiable evidence.
The RHNA allocations set by HCD require 1,284 low income units and 2,378 above moderate income units for a total of 3,662 units. The proposed required 264 units for the Orbis project is 7.2% off all the city RHNA allocation for the entire city, including all of the above moderate income units for the city. That is not a minimal or insignificant percentage. Furthermore, the current land area of Chino is calculated to be 18,938 acres. The approximate 10.52 gross acres of the Orbis project represents only .055% of all land in Chino. When placing 7.2% of RHNA required allocations on 0.055% of all acreage in the city, the Orbis project acreage is accounting for over 13,295% of the city’s RHNA allocation for the entire city. When squeezing in the 264 units on only about
5.1 acres, the city is placing over 27,000% of its RHNA allocation on one small lot of all acreage in the city. There is no reasonable justification for the 10.52 gross acreage 872
ever to have been chosen by our city government to have such unproportionate affordable housing to be built on the Orbis site.
The City Council must rectify why this 10.52 acre site was included in the mixed-use overlay districts and then allow an enormous storage facility to be included in the project. The 10.52 acre parcel only represents one half of one percent (.0055%) of all acres in the city. There were numerous other parcels of land in the city that could have been selected to fulfill the states RHNA. State law at Gov. Code 65583.2(c)(3)(B)(iv) that sites allowing at least 30 units per acre are required, not that a minimum of 30 units per acre are required. The state allows a default density option allowing city to choose and designate sufficient sites that would satisfy the RHNA 3,662 units under the low income category. The state did not select the 10.52 acre parcel, nor did the state disallow other sites/parcels from being selected to satisfy the RHNA quota. This error should not be further worsened by allowing a such an enormous storage facility that will have a negative impact on the community.
By subdividing the 10.52 acres into 5 smaller lots, and placing all the affordable housing units onto only 5.02 acres is inconsistent and inadequate under state law at Gov. Code Section 65583.2(c)(2)(b).
As per public information contained on the County of San Bernardino, the property parcel (APN 1052-581-03) is recorded as being purchased in September of 2022 by Orbis Schaefer LC (30% ownership) and Clark Schaefer Partners LLC (70% ownership), hereafter referred to as “Orbis” or “Orbis Real Estate Partners”. The property was acquired from the previous owner, Zivelonghi Investment CO LLC. Under state law, the property is held in tenancy in common. Neither of the tenants in common Orbis Schaefer LC (30% ownership) and Clark Schaefer Partners LLC (70% ownership) have legal single ownership or single control of such property.
THE CITY COUNCIL SHOULD REJECT THE TENTATIVE TRACT MAP AND
SUBDIVISION OF THE PROPERTY FOR THE ORBIS PROJECT TO BE
CONSTRUCTED ON THE SCHAEFER/EUCLID AFFORDABLE HOUSING
DEVELOPMENT HAVING APN 1052-581-03.
By law, the city is required to make the negative findings before it can approve the tentative tract map. Thus, for the city to approve a tentative tract map, it must make the general plan consistency finding in Government Code section 66473.5 and must also find the inverse of the seven “negative” findings in section 66474. It is officially requested that the City Council also perform their due diligence and carefully consider the particulars of these objections. Upon reaching its decisions, the City Council should issue written findings of facts to support their decisions as required under Section
19.01.110.B.5. The findings of fact must be based on substantial evidence, meaning the findings must be supported by relevant and competent evidence in the record bridging 873
the gap between raw evidence and the final decision. The commission should clearly explain how their actions align with the local general plan, zoning ordinance, and state statutes.
Sincerely,
Robert Nigg, citizen of Chino
874
APPEAL NO. 3
The following is being appealed to the City Council under Zoning Code 20.23.150.B. The appeal concerns the decision of the Planning Commission on May 21, 2025. The below matters as decided by the Planning Commission are disputed and is therefore be appealed for a hearing required under California law.
See below for matters in dispute.
Subject: Appeal No. 3 - Objection to and Appeal of the Mixed-Use Development by Applicant Orbis Schaefer LLC. Violations and Inconsistencies in Zoning Code Standards
The following objections and appeal of Director of Development Service’s recommendation to approve the Permit Applications under PL22-074; PL22-0075; PL24- 0080, and PL22-0081 is being submitted to the Planning Commission in opposition to the proposed Orbis Development. It is argued that the development includes violations of zoning standards in violation of the Chino Zoning Code. The development is located on a 10.52 acres parcel having APN 1052-581-03. The appeal is being submitted under the provisions of Chino Code of Ordinances, including Title 20, Zoning, Section 20.23.150.
The asserted violations are:
1. Zoning Code, Section 20.18.030 -Number of Parking Spaces Required Under Table 20.18-1, off-street parking for commercial/shopping center uses requires 4 spaces for each 1,000 sq. ft. of gross leasable floor area (1 for every 250 sq. ft.). For restaurant uses, zoning standards requires 1 parking space for each 100 sq. ft. of public seating area. There are two separate uses (dining and retail) identified as being proposed in the development.
The Planning Division has deficiently accepted the declared usage of all the proposed uses of commercial retail, drive-thru restaurants, and outside dining areas totaling 25,285 sq. ft. as being only commercial/shopping center activity requiring only 102 parking spaces (25,285 divided by 250 ft. = 101.24 rounded up to 102 spaces). This interpretation is in direct conflict with and is inconsistent with the zoning code at Subsection 20.18.030.C which states: “Multiple uses. Whenever more than one land use is conducted on a lot or parcel, the required number of parking spaces shall be the sum of the requirements for each individual use.”
The developer, during public neighborhood meetings promoted the usage in the commercial/retail area as being planned for eating establishments. Reference is made 875
to the PowerPoint presentation, page 32, from the January 23, 2025 Neighborhood Meeting by Orbis.
On March 5, 2025 an email was sent to the Planning Division citing the possible deficiency in that the restaurant/outdoor dining was not being properly calculated for the number of parking spaces required. On May 8
th
, the city planner was again verbally advised of the
restaurant dining seating area was not being properly calculated. The City Planner stated it was the city’s interpretation that the shopping center designation was the correct method to be used to calculate for all of the required number of parking spaces.
This interpretation is in direct conflict with the zoning code which states the required number of parking spaces shall be the sum of the requirements for each individual use.
Without the developer providing specific details of the intended use for the entire 25,285 sq. ft. retail/dining areas, only rational projections can be made. It would not be equitable to consider all 25,285 sq. ft. as being devoted only to dining area usage, which would require 253 parking spaces. However, even if the 20,800 commercial/retail usage were split equally 50/50 between the retail and restaurant usage (a conservative method in favor of the developer), and all outdoor dining areas were to be totaled for each individual use as required in 20.18.030.C, the project would require 191 parking spaces for the retail/ dining uses. In the current plans submitted by Orbis, the developer in claiming only 143 stalls for the commercial part of the project, resulting in a projected shortage of almost 50 parking spaces. As example, per the application for a special conditional use permit under PL-24-0081 for two fast drive-thru restaurants should unquestionably be considered as designated as restaurant use. The Planning Division’s classification for this drive-thru restaurant use as being retail/shopping center cannot be supported by any rational or logically conclusion of facts.
There is already the valid argument that since there is no nearby on-street parking surrounding the project, and there will be a shortage of available parking in the proposed development. This apprehension will only be compounded by even less parking spaces being provided than required by the zoning code standards.
The Planning Commission should deny the application until such time as adequate clarification and details are provided to determine the correct number of parking spaces required in the development. The Planning Commission should require further information from the developer and that the city planning staff utilizes the required standards of applying the sum for each individual use. If additional parking spaces are required to be provided, such an increase would likely cause significant changes to the site plan and building configurations. It would be inappropriate for the Planning Commission to approve 876
the project without having a full understanding of the actual number of parking spaces required under the zoning code standards.
In issuing its findings of fact, the Planning Commission should explain how and why the calculation of required parking spaces should not be determined by each individual use.
2. Zoning Code, Section 20.09.090 for Building Separation and Setbacks Building Separation: Under Table 20.09-7, zoning standards require a minimum of 15 feet of building separation. The site plans for the development disclose that there is only an approximate 7’ 2” separation between the 13,800 retail/dining building and the 132,438 sq. ft. storage facility between building.
Inquiry with the city planner on May 9, determined that the city reads the standards to allow the two buildings to be considered as one building and no separation is needed, making reference to the building codes.
This interpretation is considered inconsistent with the requirements of the zoning code.
While the building codes and zoning codes may have similar terms, they are not the same.
While the building codes might combine the structures for other regulations such as type of construction and for fire protection standards, zoning regulations are specific to land use and separation requirements, and should not be directly overridden by building code interpretations. As example, a 20-story skyscraper could be built within the building code, but it would be in violation of our zoning code.
Zoning regulations control land use and the density of development within a specific area, including setback requirements. Building codes, on the other hand, focus on the structural safety and performance of individual structures.
There is a great amount of controversy in the Orbis proposed development. The height, density and inclusion of the storage facility are opposed by the local community. For the Planning Division to interpret the zoning code that the minimum building separations of 15 feet is not necessary is without any common sense and lacks a basic understanding that the appearance and density of the project will be adversity affected.
The Planning Commission should deny the application until such time as adequate clarification and details are provided to determine the appropriate determination of the zoning code for the minimum standards for building separations. The Planning Commission should seek further clarification from the Planning Division as to why they are using building code standards rather that zoning code standards, particularly when land use and density issues are in question. Should the minimum 15 foot building 877
separation be deemed the appropriate standards, it could require sufficient changes to the site plan and building configurations. It would be inappropriate for the Planning Commission to approve the project at this time without having a full understanding of why the Planning Division is overriding zoning standards.
In issuing its findings of fact, the Planning Commission should explain how and why the use of building codes supersedes the zoning code, since the zoning code standards control the density and building separations, which are critical to developments be compatible to the area.
Setbacks: Under Section 20.09.090.G and Table 20.09-7, Note 2, the zoning code standards require that “The upper story above 40 feet shall be setback back an additional seven feet from the interior property line if the project is adjacent to a Residential zoning district.”
Inquiry with the city planner on May 8, determined that the city did not believe any further setback were needed for the apartment complex facing the north private road in the proposed development. It was stated that the road abutted another mixed-use overlay site which was not considered to be a residential zoning district.
An objection is made to this interpretation, as the language in Note 2 does not use the term “abut” or “abutting”, rather the language of the note specifically used the term “adjacent”. There is clearly a Residential zoning district that is adjacent to the project on the west side of Fern. Therefore, it is argued that the setback should be additional seven feet from the interior property line. Within the zoning code, the term ”abut” was used at least 32 times, but the city did not use this term in Note 2, it used the term “adjacent”.
Therefore, the plain and ordinary meaning of adjacent should be used resulting in the proposed project is adjacent to a Residential zoning district.
There is also the issue of safety. The apartments on the north side of the complex have private outdoor patios. These patios will be located very close to the curb area of the private road. It is estimated that this private road will generate several hundred uses during the normal daily use. Having a patio, where children would be anticipated to be playing very close to the road, without an adequate setback should not be allowed by the city.
The Planning Commission should deny the application until such time as adequate clarification and details are known of the actual setbacks between the private road and the building entrance/exit area and the patio and the curb. A review of the site and architecture plans could not determine the actual setbacks and how such setbacks were being measured. Should additional setbacks be required, it could require sufficient changes to the site plan and building configurations. It would be inappropriate for the 878
Planning Commission to approve the project at this time without having a full understanding of why the Planning Division is overriding zoning standards.
In issuing its findings of fact, the Planning Commission should explain how and why the setback was determined and if it strictly complies with the requirements of Section
20.09.090.G and Table 20.09-7, Note 2 of the zoning code.
Conclusion: Until such time as the parking space, building separations, and setbacks are determined to be in compliance with the zoning code, the Planning Commission should delay any decision to approve the project.
Sincerely,
Robert Nigg
879
880
881
Allen Matkins Leck Gamble Mallory & Natsis LLP
Attorneys at Law
2010 Main Street, 8th Floor | Irvine, CA 92614-7214
Telephone: 949.553.1313 | Facsimile: 949.553.8354
www.allenmatkins.com
Jonathan E. Shardlow
E-mail: [email protected]
Direct Dial: 9498515422 File Number: 392574.00003
Los Angeles | Orange County | San Diego | Century City | San Francisco | New York Allen Matkins
Via Electronic Mail
May 16, 2025
Fred Galante, Esq.
City Attorney
City of Chino
[email protected]
1 Park Plaza Suite 1000
Irvine, California, 92614
Re: Housing Accountability Act and SB 330 Protections Applicable to Eden Mixed-Use Project
Applicant: Orbis Schaefer, LLC | APN: 1052-581-03 | Planning Case Nos. PL22-0074, PL22-0075, PL24-0080, PL24-0081)
Dear Mr. Galante:
This firm represents Orbis Schaefer, LLC (“Applicant”), in connection with the proposed Eden Mixed-Use Development Project (“Project”), which is scheduled for public hearing before the Planning Commission on May 21, 2025. The Project site is located on the north side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03) and encompasses approximately
9.82 acres ("Site"). As currently proposed, the Project includes 264 multifamily residential units (including 24 affordable units), approximately 20,800 square feet of commercial retail, and a 132,438 square foot self-storage facility. The Project also includes a request to subdivide the Site into five lots and associated access, parking, landscaping, and infrastructure improvements. We provide this letter to clarify the applicability of state housing law to the Project as currently proposed and to assist the City in ensuring that the Planning Commission’s consideration remains consistent with the Housing Accountability Act ("HAA") and SB 330.
As confirmed in the staff report for the May 21st public hearing and the City’s administrative record, the Applicant submitted a Preliminary Application pursuant to Senate Bill 330 (“SB 330”) on December 20, 2024. The City properly determined that the Project satisfies the requirements for a “housing development project” under the HAA because more than two-thirds of the proposed floor area is designated for residential use. (Gov. Code, § 65589.5(h)(2)(B).) As such, the Project is entitled to the full protections of the HAA and the Housing Crisis Act of 2019, including the vesting 882
Allen Matkins Leck Gamble Mallory & Natsis LLP
Attorneys at Law
City Attorney, City of Chino
May 16, 2025
of applicable development standards upon SB 330 intake and significant limitations on the City’s discretion to deny or reduce residential density. (Gov. Code, §§ 65589.5(f), (j), (o); § 65941.1.) The HAA only permits local governments to subject housing development projects (defined to include non-residential uses in a qualifying mixed use project) to “objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdiction’s share of the regional housing need ….” (Gov. Code § 65589.5(f)(1).) The HAA’s prohibition of subjective development standards is one of the primary ways that the Act promotes the approval of housing development projects. The HAA defines “objective” as “involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.” (Gov. Code § 65589.5(h)(9).) We recognize that in the context of mixed-use projects, questions are sometimes raised as to whether the HAA's protections apply only to the residential component of the development. Here, with respect to the Project, we understand the possibility of certain unsupported views of the HAA being raised at the upcoming hearing purporting that only the residential component of the Project is protected under the HAA, and that the City may therefore deny approvals, including the SCUP, related to the Project’s commercial and self-storage uses. That interpretation, however, is unsupported by law and directly contrary to published guidance from the California Department of Housing and Community Development (“HCD”).
When a mixed-use project designates at least two-thirds of its total floor area for residential use, the entire development qualifies as a “housing development project” under the HAA (Gov.
Code, § 65589.5(h)(2)(B)). The HAA’s protections are therefore triggered not only for the residential units but for the project as a whole—including non-residential components such as commercial or self-storage uses.
HCD has issued express guidance confirming this interpretation. In HCD’s Housing Accountability Act Technical Assistance Advisory dated September 15, 2020, the question was posed: “Under the HAA, is the retail/commercial component of a mixed-use project subject to review when the housing component must be approved?” HCD’s answer was “Yes.” The local government must apply its objective standards and policies to “the entirety of the mixed-use project” (including the commercial part) so long as those standards were in effect when the application was deemed complete. (HCD Technical Assistance Advisory, at p. 17 [FAQ #12] (Sept. 2020).) In short, the HAA does not allow a city to carve out or separately reject the commercial piece of a qualifying mixed-use development simply because it’s commercial; the project must be reviewed (and if compliant, approved) as an indivisible whole.
Moreover, the HAA defines “disapproval” broadly to include any denial of a required permit or entitlement for the project—including a use permit for a commercial component. Thus, 883
Allen Matkins Leck Gamble Mallory & Natsis LLP
Attorneys at Law
City Attorney, City of Chino
May 16, 2025
withholding approval for a self-storage or retail element within a qualifying mixed-use project would constitute a prohibited “disapproval” under the HAA unless the jurisdiction can make written findings of a specific, unmitigable adverse impact to health or safety (Gov. Code, § 65589.5(d), (j), (h)(6).)
This interpretation is also supported by the legislative history of the 2017 amendments to the HAA (AB 678 and SB 167). California’s HAA (Gov. Code § 65589.5) explicitly includes certain mixed-use developments in its definition of a “housing development project.” Under Section 65589.5(h)(2), a qualifying mixed-use project is one in which at least two-thirds of the project’s total square footage is designated for residential use. In other words, if a development is primarily residential (≥ 67% of floor area), it is treated as a housing development project under the HAA, even though it contains non-residential (commercial) components. This statutory threshold was established by 2017 amendments (AB 678/SB 167) that broadened HAA coverage – replacing a prior, narrower rule that had limited qualifying mixed-use projects to those with “neighborhood commercial” uses on the first floor. The legislative intent behind this change was to ensure any mixed-use project dominated by housing would receive HAA protections, rather than excluding projects just because they contained larger or non-“neighborhood” commercial elements (like selfstorage). (Assem. Floor Analysis of AB 678 (Sept. 13, 2017).). Accordingly, so long as the twothirds residential use test is met, the entire development (including its commercial portions) is considered a protected housing project under the HAA.
Case law interpreting the HAA reinforces this view. In California Renters Legal Advocacy & Education Fund v. City of San Mateo (2021) 68 Cal.App.5th 820, 831–840, the court held that housing developments compliant with objective standards are entitled to approval, and that local governments cannot rely on subjective criteria to deny or reduce such projects. While San Mateo involved a residential-only project, the court emphasized the HAA’s protective scope and legislative purpose—further supporting that a compliant mixed-use project is shielded from piecemeal denial.
Similarly, in Reznitskiy v. County of Marin (2022) 79 Cal.App.5th 1016, 1024, the Court of Appeal confirmed that mixed-use projects meeting the two-thirds residential threshold fall within the statutory definition of “housing development project.”
HCD’s interpretation, coupled with the Legislature’s express intent and judicial application of the HAA, confirms that qualifying mixed-use projects must be evaluated and approved as a unified whole—not fragmented into “protected” and “unprotected” components. Denial of a commercial element is, in effect, a denial of the project, and therefore subject to the full rigor of the HAA’s limitations.
A local government cannot evade the HAA by approving only the residential portion and rejecting or unreasonably conditioning the commercial portion. So long as the proposal before the agency is a single integrated project, the HAA compels the agency to treat it as one housing 884
Allen Matkins Leck Gamble Mallory & Natsis LLP
Attorneys at Law
City Attorney, City of Chino
May 16, 2025
development project. In practical terms, the city must either approve the whole project (with at most objective adjustments) or comply with the HAA’s stringent findings to justify a denial or reduction.
We respectfully urge the City to continue treating the Project as a single, cohesive housing development under the HAA and SB 330, and to ensure that all components—residential and nonresidential—are afforded the full extent of the protections those statutes provide. As the City is aware, when a project qualifies under the HAA, the scope of local discretion is sharply constrained, and the City must approve the project unless it can make very specific, narrowly defined findings related to unmitigable health or safety impacts. We hope this summary is helpful in guiding the City’s review process and in supporting a legally sound basis for Commission action consistent with those state mandates. Please do not hesitate to contact us if we can provide any further clarification or assistance.
Very truly yours,
Jonathan E. Shardlow
885
01225.0005/813665.1
RESOLUTION NO. 2025-048
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHINO,
CALIFORNIA, DENYING ROBERT NIGG’S APPEAL AND APPROVING
PL22-0074 (SPECIAL CONDITIONAL USE PERMIT), PL22-0075 (SITE APPROVAL), PL24-0080 (TENTATIVE TRACT MAP NO. 20634), AND PL24- 0081 (SPECIAL CONDITIONAL USE PERMIT) TO SUBDIVIDE
APPROXIMATELY 9.82 ACRES OF LAND INTO FIVE LOTS FOR THE
CONSTRUCTION OF THE EDEN MIXED-USE DEVELOPMENT PROJECT
CONSISTING OF 20,800 SQUARE FEET OF COMMERCIAL RETAIL, A 132,438 SQUARE FOOT SELF-STORAGE FACILITY, AND A 264-UNIT
RESIDENTIAL RENTAL COMMUNITY CONSISTING OF A FOUR-STORY APARTMENT BUILDING AT A DENSITY OF 26.9 DWELLING UNITS PER
ACRE, AND TO CONDITIONALLY PERMIT TWO FAST FOOD DRIVE-THRU
RESTAURANTS AND A SELF-STORAGE FACILITY, LOCATED WITHIN THE
GENERAL COMMERCIAL (GC) LAND USE DESIGNATION OF THE EAST
CHINO SPECIFIC PLAN WITHIN THE MIXED USE OVERLAY (MUO)
DISTRICT, LOCATED ON THE NORTH SIDE OF SCHAEFER AVENUE
BETWEEN EUCLID AVENUE AND FERN AVENUE (APN: 1052-581-03).
WHEREAS, the Chino 2021-2029 Housing Element (Housing Element) update was adopted by the City Council on January 4, 2022, with revisions to the Housing Element being adopted in December 2024. The Housing Element established an Affordable Housing Overlay (AHO) and Mixed Use Overlay (MUO) on sites throughout the City that had been identified during the drafting of the Housing Element as a strategy for meeting the City’s Regional Housing Need Assessment (RHNA) numbers. Housing sites within both overlays allow for residential development of up to 30 dwelling units per acre (du/ac) provided that projects provide affordable housing for low to very low income households; and
WHEREAS, Orbis Real Estate Partners (the “Applicant”), on October 19, 2022, filed an application with the City of Chino (the “City”) for PL22-0074 (Special Conditional Use Permit) and PL22-0075 (Site Approval) for the development of a commercial center; and WHEREAS, on October 18, 2023, the Applicant revised the scope of the Project for PL22- 0074 (Special Conditional Use Permit) and PL22-0075 (Site Approval) and filed subsequent applications on July 9, 2024 with the City for approval of PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634), and PL24-0081 (Special Conditional Use Permit) (the “Project”) to subdivide approximately 9.82 acres of land into five lots for the construction of the Eden mixed-use development project consisting of 20,800 square feet of commercial retail, a 132,438 square foot self-storage facility, and a 264-unit residential rental community consisting of a four-story apartment building at a density of
26.9 dwelling units per acre, and to conditionally permit two fast food drive-thru restaurants and a self-storage facility, located within the General Commercial (GC) land use designation of the East Chino Specific Plan (ECSP) within the Mixed Use Overlay (MUO) district, located on the north side of Schaefer Avenue between Euclid Avenue and Fern Avenue (APN: 1052-581-03); and
WHEREAS, the Applicant filed a preliminary application with the City on December 20, 2024; and
886
RESOLUTION NO. 2025-048
01225.0005/813665.1
WHEREAS, in compliance with the California Environmental Quality Act (CEQA), an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, dated April 11, 2025, has been prepared by Applied Planning, Inc.; and
WHEREAS, on May 21, 2025, the Planning Commission held a duly noticed public hearing for the Project in compliance with the law, and, after entertaining the written and oral report of staff, and taking public testimony, unanimously approved the Project with a 6-0 (one Commissioner absent); and
WHEREAS, Robert Nigg (the “Appellant”) filed a timely appeal of the approval of the project; and
WHEREAS, on July 15, 2025, the City Council held a duly noticed public hearing to consider Appellant’s appeal.
NOW, THEREFORE, the City Council of the City of Chino, California, does hereby FIND, DETERMINE, and RESOLVE as follows:
A. The foregoing recitals are true and correct and incorporated herein.
B. Based on substantial evidence, both written and oral, from the public hearing, the City Council makes the following findings and takes the following actions on the appeal and on PL22- 0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634), and PL24-0081 (Special Conditional Use Permit):
1. PL22-0075 (Site Approval)
a. The proposed Project is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), as General Plan Goal LU-1 aims to enhance livability in the City, with Objective LU-1.1 encouraging a variety of housing types that meet the housing needs of residents of all income levels in Chino. The Project is located on a site designated General Commercial (GC) with a Mixed Use Overlay (MUO), as identified in the City’s 2021-2029 Housing Element, and proposes 264 multi-family units (including 24 affordable units for lowincome households), 20,800 square feet of commercial space, and a 132,438 square foot self-storage facility, located within the Mixed Use Overlay (MUO) within the East Chino Specific Plan (ECSP) and has been designed to meet applicable development standards and design guidelines;
b. The proposed Project is permitted within the zoning district in which it is proposed and complies with all applicable provisions of the City's Zoning Code. The Project site is located in the GC land use designation of the East Chino Specific Plan and within the MUO district which allows for mixed-use projects with affordable residential units. The proposed Project includes the development of a 264-unit, four-story apartment building, 20,800 square feet of commercial space, and a 132,438 square foot self-storage facility. The Project complies with all standards including building setbacks, lot coverage, height, parking, and landscape requirements;
887
RESOLUTION NO. 2025-048
01225.0005/813665.1
c. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape, access, type and intensity of development have been met or exceeded. The 9.82-acre site is flat and will have adequate infrastructure and five points of vehicular access from Euclid Avenue, Fern Avenue and Schaefer Avenue. Utilities and stormwater improvements will be extended to serve the site;
d. The subject site for the Project relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed Project, in that the Project site is located along Fern Avenue and Schaefer Avenue, which are designated as primary arterials and Euclid Avenue, which is designated as an expressway. Access to the site is provided from the adjacent streets. The surrounding streets have been designed to carry the type of traffic visiting the site and additional street improvements will be required of the Project to improve the streets to ultimate conditions where needed;
e. The proposed Project is compatible with those on abutting properties and in the surrounding neighborhood. There is an existing commercial center, Stater Bros.
Plaza, located to the south of the Project site which will interface with the commercial component of the Project. The parcel to the north is currently vacant with an underlying land use designation of GC and within the MUO, consistent with the Project site. The property to the east is located within the City of Ontario and has been designated Medium Density Residential by the Ontario General Plan, with an Affordable Housing Overlay. The Medium Density designation in Ontario allows development at 11 to 25 units per acre while the Affordable Housing Overlay in Ontario allows a minimum of 20 units per acre and a maximum of 30 units per acre, consistent with the City of Chino MUO. The property west of the Project site is designated RD 4.5 by the ECSP. Compatibility with the property located west of the Project site is achieved through transitional building heights, increased setbacks along Fern Avenue adjacent to single-family homes, and a contemporary architectural design that includes a palette of earth-tone colors; f. The proposed location, size, and operating characteristics of the proposed Project will not be detrimental to the public interest, health, safety or general welfare, as the proposed mixed-use development of residential and commercial uses supports walkability and neighborhood serving uses and is consistent with the MUO. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”;
g. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and 888
RESOLUTION NO. 2025-048
01225.0005/813665.1
h. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.
2. PL24-0080 (Tentative Parcel Map No. 20634):
a. Consistency with plans. The proposed subdivision, together with the provisions for its design and improvements, is consistent with the City’s General Plan and ECSP. The site lies within the GC land use designation with an MUO, and the subdivision supports development consistent with these designations, including the construction of residential, commercial and self-storage uses; b. Consistency with zoning. The proposed subdivision is consistent with the provisions of the Chino Zoning Ordinance and the ECSP, in that all proposed parcels exceed the minimum 10,000 square foot lot size requirement of the MUO district;
c. Suitability. The site is physically suitable for mixed-use development because all required on and off-site improvements necessary to accommodate the development will be provided in accordance with City requirements. The site is flat and does not have any development constraints that would hinder future development, and the parcels being created are of sufficient size and dimensions to accommodate the mixed-use development in accordance with the requirements of the ECSP and MUO;
d. Environmental damage. The proposed subdivisions or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared that concludes that the subdivision would not create any new significant impacts, or impacts that are significantly different than those identified in the City of Chino General Plan EIR; e. Wastewater. The discharge of waste from the proposed subdivision into a community sewer system will not result in violation of existing requirements prescribed by a California Regional Water Quality Control Board pursuant to Division 7 (commencing with Section 13000 of the Water Code); f. Water service. The review of the City Engineer or water service agency concludes that there is sufficient water to provide for the mixed-use development of the subdivision. Studies have been provided as part of the Addendum demonstrating that the capacity of the existing water system is adequate; g. Soils and geology. There are no adverse soil or geological conditions, according to a soils report provided with the Addendum to the City of Chino General Plan 889
RESOLUTION NO. 2025-048
01225.0005/813665.1
Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project;
h. Public health. The design of the subdivision and the associated improvements will not cause serious health problems because full public improvements will be provided and will also be designed and constructed in conformance with City standards as well as applicable State and federal regulations; i. Easements. The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. Covenants, Conditions, and Restrictions (CC&Rs) are required to be recorded with the final map and will include provisions to assure maintenance of all common areas, including landscaping, site access points and off-street parking areas, and to assure common ingress and egress between parcels;
j. Environmental documentation. The environmental documentation is adequate and conforms with the provisions of the California Environmental Quality Act. An Addendum to City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, has been prepared pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
k. Agricultural suitability. The proposed subdivision will not result in the subdivision of agricultural parcels to a size too small to sustain agricultural use under the conditions for denial listed in Section 66474.4 of the Subdivision Map Act, as the Project site is not currently encumbered with any Williamson Act contracts.
3. PL22-0074 (Special Conditional Use Permit – Self-Storage Facility):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), in that self-storage facilities in the MUO district are allowed, subject to approval of a SCUP. General Plan Objective LU-1.3 encourages commercial development that will support and enhance vibrant commercial areas and serve existing neighborhoods. Establishing a self-storage facility that is professionally operated at this location will serve the residents and local businesses within the City;
b. The subject site is physically suitable, including but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development. Additionally, the proposed self-storage facility meets all requirements and development standards set forth in Section
20.09.090.E.4 (Public Storage Facilities) in the Zoning Ordinance; c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the 890
RESOLUTION NO. 2025-048
01225.0005/813665.1
proposed use; as the self-storage use is located adjacent to Euclid Avenue with direct access to the self-storage facility from two driveways on Euclid Avenue.
Euclid Avenue is designated as an expressway and designed to carry the volume of traffic typically generated by self-storage facilities, which is generally low in volume. All other surrounding streets (Fern Avenue and Schaefer Avenue) are also capable of handling the volume of traffic generated by the proposed use; d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood, as the self-storage facility is located at the northeast corner of the Project site, adjacent to Euclid Avenue and a vacant parcel to the north. The self-storage facility will have direct access from Euclid Avenue and is anticipated to generate a low volume of traffic based on data provided in the Traffic Impact Analysis that was prepared for the overall Project. There will be no direct views from the self-storage facility to the residential properties located over 162 feet to the north. The self-storage facility is located over 600 feet from the existing residential homes located on the west side of Fern Avenue. In addition, selfstorage facilities are inherently low intensity in terms of traffic generation, noise, and activity levels, resulting in minimal trips that are short and infrequent; e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as selfstorage facilities are inherently low impact land uses that generate minimal vehicular traffic, with customer visits typically being short, infrequent, and dispersed throughout the day. In addition, the facility’s design and operational plan will include security measures such as controlled access, lighting and 24/7 surveillance systems, further promoting safety;
f. The proposed use will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and
g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the City Council deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”. In addition, the self-storage facility meets all required development standards and policies.
4. PL24-0081 (Special Conditional Use Permit – Drive-Thru Restaurants):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s); in that drive-thru restaurants in the GC land use designation of the ECSP are allowed, subject to approval of a SCUP.
Furthermore, Objective LU-1.3 of the City’s General Plan encourages commercial development that will support and enhance vibrant commercial areas to serve existing neighborhoods with a combination of daily and specialty daily needs; 891
RESOLUTION NO. 2025-048
01225.0005/813665.1
b. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as site access is provided to the fast-food drive-thru restaurants directly from Euclid Avenue and Schaefer Avenue. Both streets are designed to carry the traffic typically generated by drive-thru restaurants. All surrounding streets are capable of handling the volume of traffic that is consistent with the proposed mixed-use development;
d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood; as the drive-thru restaurants, with the approval of a SCUP, is compatible with the commercial development to the south, single family residential to the west, vacant land to the north, and future multi-family residential to the east in the City of Ontario and is consistent with the uses permitted in the GC land use designation of the ECSP. The drive-thru restaurants are strategically plotted at the southeastern corner of the Project site, away from the single-family residential homes to the west and north. Homes to the west are buffered from the proposed apartment building and Fern Avenue, while the homes to the north are buffered by the self-storage facility and vacant 3-acre piece of land; e. The proposed location, size, and operating characteristics of the propose use will not be detrimental to the public interest, health, safety or general welfare; as the drive-thru restaurants, with the approval of a SCUP, are compatible with the commercial development to the south, single-family residential to the west, vacant land to the north and future multi-family residential to the east in the City of Ontario and is consistent with the uses permitted in the GC land use of the ECSP. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deemed necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”. In addition, the drive-thru restaurants meet all required development standards and policies;
f. The proposed use will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA; and 892
RESOLUTION NO. 2025-048
01225.0005/813665.1
g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed use and have been imposed as conditions of Project approval by the Chino Planning Commission. Further, the proposed use meets all required development standards and policies pertaining to self-storage facilities.
5. Affordable Housing Findings:
a. The proposed development meets the affordability criteria for the requested density in accordance with the requirements of subsection (D) and (I). The Applicant proposes the construction of 264 multi-family rental units on 9.82 acres, resulting in a density of 26.9 dwelling units per acre. To qualify for this density, the Project is required to provide a minimum of 9% of the total of units as affordable to low income households. In compliance with this requirement, 24 of the 264 units will be affordable units; and
b. The increased density would not have a specific adverse impact, as defined in paragraph (2) of subdivision (d) of Section 65589.5 of the Government Code, upon public health and safety or the physical environment or on any real property listed in the California Register of Historic Resources, as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines that confirms the increased density, would not result in any new significant environmental impacts than those already analyzed in the certified General Plan EIR.
6. CEQA Findings. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project has been prepared by Applied Planning pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The City Council has considered the Addendum and Environmental Impact Report as part of its decision on this Project pursuant to Section 15164. The City Council hereby finds that the Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The City Council hereby finds that the Project will not have any impacts that would require a revision to the EIR or any other additional environmental review.
7. Deny the appeal and grant approval of PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit). The City Council hereby denies the appeal and approves PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24- 0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit) subject to the Conditions of Approval attached hereto as Exhibit “A”. Applicant, including its successors and assigns, shall be responsible for implementing and complying with all conditions set forth in Exhibit “A”.
8. Actions by the City Clerk. The City Clerk is hereby directed to attest to the adoption of this Resolution as of the date set forth below and forthwith transmit a copy of this Resolution, by regular mail, to the Applicant at the address of record set forth in the Application and to the Appellant at the address listed on the appeal.
893
RESOLUTION NO. 2025-048
01225.0005/813665.1
PASSED, APPROVED, AND ADOPTED THIS 15
TH DAY OF JULY 2025.
______
EUNICE M. ULLOA, MAYOR
ATTEST:
__________________________________
NATALIE GONZAGA, CITY CLERK
State of California )
County of San Bernardino ) §
City of Chino )
I, NATALIE GONZAGA, City Clerk of the City of Chino, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting held on the 15 th day of
July, 2025 by the following votes:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
NATALIE GONZAGA, CITY CLERK
Attachment: Exhibit A – Conditions of Approval
894
EXHIBIT A
DEPARTMENTAL
CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
The departments listed below have reviewed the above referenced application. Those departments marked with an “X” have required conditions of approval to be imposed on the project.
Development Services Department –
[X] Planning Division
[ ] ADA Accessibility Division
Public Works Department –
[X] Engineering Division
[ ] Traffic Division
[X] Chino Valley Independent Fire District
[X] Police Department
[ ] Finance Department
[ ] Community Services, Parks & Recreation Department
895
DEVELOPMENT SERVICES DEPARTMENT
PLANNING DIVISION CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
NOTE: CONDITIONS IN BOLD WERE ADDED BY THE PLANNING COMMISSION.
1.0 TIME LIMITS:
1.1. The above referenced Site Approval and Special Conditional Use Permits shall expire on May 21, 2026, if building permits are not obtained and/or the approved uses have not commenced. The expiration date may be extended upon written request by the applicant on a City application form.
The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.
1.2. The above reference Tentative Tract Map shall expire on May 21, 2027, if the final map is not recorded. The expiration date may be extended upon written request by the applicant on a City application form. The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.
1.3. Should any of the special conditionally permitted uses cease to exist for 180 or more consecutive days, then the permit shall be deemed null and void.
2.0 GENERAL REQUIREMENTS:
2.1. Failure to comply with any conditions of approval shall be deemed just cause for revocation of project approval by the Planning Commission.
2.2. The project shall proceed only in accordance with the approved plans on file with the Development Services Department, and with the conditions contained herein and the Chino Municipal Code.
2.3. The Director of Development Services shall have the authority to approve minor deviations in the site plan, architecture and/or landscape providing 896
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
the total approved building area is not exceeded. If it is determined that the changes will be substantial, approval from the Planning Commission will be required.
2.4. Approval of this request shall not waive compliance with all sections of the Chino Municipal Code, all other applicable City ordinances, and applicable specific plans.
2.5. Pursuant to Government Code Section 66020, the applicant is informed that the 90-day period in which the applicant may protest the fees, dedications, reservation or other exaction imposed on this project through the conditions of approval has begun.
2.6. In the event that any condition contained herein is determined to be invalid or legally unenforceable, then all remaining conditions shall remain in force.
2.7. In the event that any condition imposing a fee, exaction, dedication, or other mitigation measure is challenged by the project’s sponsors and/or other parties in an action filed in a court of law, which action is brought within the time period provided for by law, this approval shall be suspended pending dismissal of such action, the expiration of the limitation period applicable to such action, or final resolution of such action. If any condition is invalidated by a court of law, the applicable section of the entire project shall be reviewed by the City and substitute conditions may be imposed.
2.8. The applicant shall indemnify the City and its elected boards, commissions, officers, agents and employees and will hold and save them and each of them harmless from any and all actions, claims, liabilities, losses, damages, penalties, obligations and expenses, including but not limited to attorneys’ fees and costs, (collectively “claims”) against the City for any such claims and shall be responsible for any judgment arising therefrom. The City shall provide the applicant with notice of the pendency of such action and shall request that the applicant defend such action. The applicant may utilize the City Attorney’s office or use legal counsel of its choosing, but shall reimburse the City for any necessary legal cost incurred by City, including for the City’s required participation in defense of the claims. The applicant shall provide a deposit in the amount of 100% of the City’s estimate, in its sole and absolute discretion, of the cost of litigation, including the cost of any award of attorney’s fees, and shall make additional deposits as requested by City to keep the deposit at such level. If the applicant fails to provide or maintain the deposit, the City may abandon the action and the applicant shall pay all costs resulting therefrom and City shall have no liability to the applicant. 897
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
2.9. The City of Chino has an exclusive contract with Waste Management for all solid waste collection and hauling services within the City. The applicant shall be responsible for making arrangements with Waste Management for disposal of any/all construction debris or trash generated as a result of this permit. Waste Management can be reached at 1-800 423-9986.
2.10. Any change of use in the project shall be reviewed by the Development Services Department for compliance with CEQA.
2.11. All proposed signs shall be designed to conform with Chino Municipal Code Title 16 (Signs) and shall require separate application and approval by the Director of Development Services prior to installation. The applicant shall submit a Sign Program to the Development Services Department for review and approval.
2.12. Pursuant to Public Resources Code Section 21089 and Fish and Wildlife Code Section 711.4, the developer shall provide those fees marked [X] below in the form of a check made payable to the San Bernardino County Clerk of the Board of Supervisors within 5 days of Planning Commission approval. Project approval shall not be complete until the required fee(s) is (are) paid:
[X] $50 for the Notice of Determination filing fee.
2.13. Special Conditions:
2.13.1. Since the project is utilizing the Affordable Housing Overlay component, the applicant shall enter into an Affordable Housing Overlay agreement with the City in a form approved by the City Attorney.
2.13.2. All fees, including City Attorney fees, associated with drafting the Affordable Housing Overlay agreement shall be paid by the developer.
3.0 PRIOR TO RECORDATION OF THE FINAL MAP:
3.1. The Covenants, Conditions, and Restrictions (CC&Rs) shall be prepared in accordance with the City Attorney Policy – Guidelines and Protocol for Review and Approval of CC&Rs and submitted for review and approval by the Development Services and Public Works Departments, Planning and Engineering Divisions, and the City Attorney. The approved CC&Rs shall be recorded concurrently with the final map and a recorded copy 898
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
submitted to the Director of Development Services. The following items shall be included in the final CC&Rs:
3.1.1. Reciprocal agreement to assure maintenance of all common areas, including landscaping, site access points and off-street parking areas, and to assure common ingress and egress between parcels.
The intent of the CC&Rs is to assure that the entire project is designed and maintained in a uniform and comprehensive manner.
3.1.2. Provide a maintenance agreement for review and approval. The proposed maintenance agreement shall contain the Owner’s maintenance obligations with respect to various facilities including, but not limited to, right-of-way landscaping, private streets, sidewalks, utilities, streetlights, and Water Quality Management Plan (WQMP) features. This document must be submitted to and approved by the City before it is submitted to any other governmental entity.
3.1.3. After recordation of Tentative Tract Map No. 20634, provide one hard copy and one electronic copy of the recorded CC&Rs shall be submitted to the Director of Development Services.
4.0 PRIOR TO THE ISSUANCE OF A BUILDING AND/OR GRADING PERMIT:
4.1. The developer shall pay development impact fees per Engineering’s conditions. Other applicable fees may include, but not be limited to, new construction fee, park or open space fees, school fees, drainage fees, sewer fees, building permit and plan check fees.
4.2. Revised plans, incorporating all conditions of approval, shall be submitted for review and approval by the Director of Development Services.
4.3. All plans shall be coordinated for consistency.
4.4. The developer shall submit two sets of structural plans/construction documents. Said plans shall include one set of structural calculations, one set of Title 24 energy calculations, and one soils report. The developer shall also submit the above documents in digital format to the Building Division once approved.
4.5. A construction management plan shall be submitted for review and approval by the Director of Development Services. The plan shall coordinate and address construction activities that may impact residents, the Police Department, School District, other parties that provide essential 899
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
services, and/or surrounding businesses in adjacent areas. Elements of the plan would contain, but not be limited to, the following:
a. Routing of construction equipment
b. Hours of operation
c. Dust control
d. Vector control
e. Vehicle, equipment, and personnel staging
f. Pre-construction meetings
g. Contractor/subcontractor acknowledgement, obligations, and penalties h. Traffic control and coordination
i. Security and interim fencing
j. Signs posted on the site with a contact number for the job site construction manager and the City’s Code Enforcement Division. Signs shall measure at least four feet by eight feet, and shall be posted along every street frontage. The developer shall contact the City immediately upon any change in contact numbers.
k. Building and landscape phasing. This plan shall show which buildings and landscaping will be completed in which phases, and how each completed phase will be closed off from phases under construction so as to minimize conflict between construction vehicles, construction equipment, employees, and residents, as applicable.
4.6. A precise wall plan indicating the design, location and construction details of all walls and fences shall be submitted for review and approval by the Planning and Building Divisions. All perimeter and street-facing walls, including retaining walls, shall be decorative in nature.
4.7. Prior to the issuance of any grading permit, detailed on-site landscaping and irrigation construction drawings along with a copy of the Planning Commission approved conceptual landscape plans and a copy of the conditions of approval shall be submitted for review and approval by the Director of Development Services. A grading permit will not be issued until the City’s outside plan checker has completed one review of detailed landscape and irrigation plans for the development. Payment of the Landscape & Irrigation Plan Review Fee shall be due at the time of submittal. Plans shall be prepared to comply with the City’s Water Efficient Landscape Ordinance, adopted on October 6, 2015, Ordinance No. 2015-008, meet the requirements for a Landscape Documentation Package in accordance with Section 20.19.030 of the Landscape Ordinance, and shall bear the seal of a landscape architect registered with the state of California. If the site includes areas proposed to be placed within a City-maintained Landscape Maintenance District, then the plans shall be prepared on City of Chino, Engineering Division base sheets, and shall bear the seal of a landscape architect registered with the state of 900
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
California. Original mylars shall be submitted to the City upon approval of plans by the City Engineer.
4.7.1. To minimize damage to paved areas due to tree root growth, trees located within five (5) feet of any paved surface area shall be provided with root barriers unless it can be demonstrated, to the satisfaction of the Planning Division, that the root growth characteristics of the type of tree proposed does not warrant their installation.
4.8. Approval of the conceptual landscape plan by the Planning Commission does not constitute final approval. The final landscape approval (during the plan check process and/or following installation) shall be subject to the review and approval of the City’s Landscape Architect Consultant and the Director of Development Services. The City Landscape Architect or Director of Development Services may require additional/fewer trees, shrubs, vines, and ground cover as necessary, based on final site conditions during the landscape plan check process or field review process in order to mitigate any site conditions that were not apparent during either the Planning Commission review or plan check review process.
4.9. All new ground-mounted utilities, including but not limited to cable television facilities, and telephone/fiber optic facilities, shall be undergrounded. Equipment that that is not placed underground such as SCE transformers, backflow prevention devices, irrigation valves and controllers used for common landscape areas shall be placed in areas out of public view and sufficiently screened. The location and method of screening of said utilities shall be reflected in a plan and shall be subject to the review and approval by the Director of Development Services.
4.10. All electrical panels and cabinets shall be completely screened. All electrical panels and cabinets shall be fully enclosed, and integrated into and architecturally compatible with the building to the satisfaction of the Director of Development Services. The locations of the electrical panels and cabinets shall be reflected on a site plan and elevation(s) to be reviewed and approved by the Director of Development Services.
4.11. Prior to the issuance of a building permit, the approved grading plans shall be attached to the construction plan set. The project shall be built according to the plans approved by the Planning Commission on May 21, 2025, as prepared by AO Architects, Sitescapes, and Fuscoe Engineering.
Any substantial modification to the project shall require Planning Commission review and approval. If minor in nature, the modification may be reviewed and approved by the Development Services Director. 901
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
4.12. A detailed on-site exterior lighting plan shall be submitted for review and approval by the Director of Development Services. Plans shall be designed pursuant to Chino Municipal Code Section 20.10.090 (Outdoor Lighting) and shall indicate fixture design, illumination (photometric), location, height and method of shielding, so as not to adversely affect adjacent properties.
4.13. Upon submittal of construction drawings to the Building Division for plan check review, all departmental conditions of approval for the project shall be included on the sheet following the title sheet, or the first sheet of the plans. A site plan shall also be attached to all sets of construction drawings. This condition shall be a minimum requirement for acceptance of construction drawings for the Building plan check review.
4.14. The applicant is required to contact the West Valley Mosquito and Vector Control District to determine if an inspection or field survey of potential vectors and their ectoparasites is necessary. If the District so determines, an inspection or field survey shall be conducted by the District, at the applicant’s expense, prior to demolition or grading in order to protect the health of and reduce the risk of neighboring residents to vector-borne diseases. Based on the inspection or survey results, the applicant shall take appropriate vector control methods as recommended by the District.
4.15. A Water Quality Management Plan shall be prepared in accordance with County of San Bernardino requirements and submitted for review and approval by the City.
4.16. No grading permits shall be issued until all applicable biological resource mitigation measures, identified in the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project, prepared by Applied Planning, Inc., dated September 23, 2024, as they apply to the project area, have been complied with to the satisfaction of the Director of Development Services.
4.17. Special Conditions:
4.17.1. Electrical transformers shall be located in areas that are the least visible to the public and adequately screened to the satisfaction of the Director of Development Services.
4.17.2. An Administrative Approval (AA) application shall be required if any of the proposed tenants for the drive-thru restaurants are a 902
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
high-volume drive-thru user that would exceed the current drivethru design capacity.
4.17.3. The massing of the residential building along the north elevation shall be reduced from 4-stories to 3-stories.
4.17.4. The massing of the residential building around the courtyard shall be increased from 3-stories to 4-stories.
4.17.5. Signage and artwork shall be incorporated at key locations as follows:
4.17.5.1. The word “Chino” shall be displayed at the top of the monument signs located at the Euclid Avenue
and Schaefer Avenue driveway entrances.
4.17.5.2. Artwork that reflects the historical significance of the site (e.g. strawberry farming) shall be
provided at the Euclid Avenue and Schaefer
driveway entrances.
4.17.5.3. City of Chino identification signage shall be provided within the planter area located at the
corner of Euclid and Schaefer Avenues.
4.17.5.4. The mural located on the south elevation of the self-storage building shall reflect themes that
represent the City of Chino and the history of the
site.
4.17.5.5. Posters placed at the driveway entrances along Euclid Avenue and Schaefer Avenue shall
incorporate the word “Chino.”
5.0 PRIOR TO START OF CONSTRUCTION:
5.1. A pre-construction meeting, scheduled with the Building Division, shall be held with all applicable City staff members, developer, contractor, superintendent, and all subcontractors prior to start of construction.
5.2. Detailed landscape and irrigation plans for the development shall be approved by the Director of Development Services.
5.3. The approved construction management plan shall be distributed to all contractors and subcontractors and shall be maintained on-site through the duration of construction.
903
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
6.0 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
6.1. All conditions of approval shall be completed to the satisfaction of the Director of Development Services.
6.2. The fee for review of the landscaping and irrigation plans by both the City and the City’s landscape architect shall be paid by the developer.
6.3. All landscaping and irrigation shall be installed in accordance with plans on file with the Development Services Department, and irrigation systems fully operational. In addition, all hardscaped and landscaped areas shall be free of trash and debris.
6.4. A licensed landscape architect or contractor, or other licensed certified professional in a related field shall conduct a final field inspection and shall prepare a certificate of completion, which shall be filed with the Director of Development Services. The certificate of completion shall be prepared in accordance with Section 20.19.030.J of the Landscape Ordinance and shall specifically indicate that plants were installed as specified by the landscape design plan, that the irrigation system was installed as specified by the irrigation design plan, and that an irrigation audit has been performed. All landscape and irrigation audits shall be conducted by a landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape.
6.5. A landscape maintenance program for the entire project site shall be reviewed and approved by the Director of Development Services. The maintenance program shall include general landscape maintenance provisions for pruning, trimming, the replacement of any dead, decayed, or diseased vegetation, ongoing weed abatement, and replacement/repair of the irrigation system, when necessary. The landscape maintenance program shall be included with the contract with the landscape maintenance company to ensure they implement the maintenance program. In addition, the maintenance program should include provisions for periodic inspections to ensure the irrigation system is working properly, and all landscaping is being properly maintained.
6.6. Prior to issuance of a final certificate of occupancy, any temporary construction office buildings/trailers shall be removed from the site.
6.7. The project site shall be clean and free of trash and construction debris, and all construction equipment shall be removed from the site. 904
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
6.8. Special Condition:
6.8.1. Prior to the issuance of a Certificate of Occupancy for the residential component of PL22-0074 (Site Approval), a building permit shall be issued, and construction shall have commenced for the commercial portion of the project.
6.8.2. Provide trees planted in tree wells and/or potted plants with irrigation in areas adjacent to all shops where landscaping is not provided next to building walls, and to break up large, paved areas to enhance the landscape design. The location of these potted plants shall be shown on the landscape plans and the final number and locations shall be subject to the review and approval of the Director of Development Services.
7.0 ENVIRONMENTAL REQUIREMENTS & MITIGATION MEASURES:
7.1. Comply with all mitigation measures identified in the Mitigation Summary Matrix contained within the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Eden Mixed-Use Development Project and attached as Exhibit “A” to the conditions of approval, which identifies each environmental mitigation measure, the time in which it will be implemented and the responsible party for monitoring its implementation.
8.0 OTHER REQUIREMENTS:
8.1. The applicant shall disclose to all potential tenants or owners of units or buildings that the businesses/uses must be consistent with the standards of the land use designation/zoning district in which the project site is located.
8.2. The project site shall be cleared of all trash, debris, weeds, and other discarded items, and all existing buildings or structures on the project site that are proposed to be demolished shall be removed or razed within 90 days of Planning Commission approval or issuance of a grading permit, whichever occurs first. The Director of Development Services may approve an extension of time to complete the demolition, based on evidence that the applicant has exercised reasonable progress.
8.3. A coating that will facilitate the removal of graffiti shall be applied over the complete height of one side/both sides of walls and/or fences, and to a height of eight feet on building walls. If a coating is not provided, the owner of the property shall paint the buildings and/or walls to remove graffiti within 72 hours of notice.
905
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
8.4. Building and Site Design:
8.4.1. Exterior building color shall be reviewed and approved by the Director of Development Services. Colors shall be coordinated between structures, utilizing compatible hues and intensities. Final review and approval of paint colors utilizing a color test may be required prior to painting any structure, if determined necessary in the field by the Director of Development Services.
8.4.2. All building drainage gutters, downspouts, vents, etc., located on the exterior walls shall be architecturally compatible with the exterior building design and color, to the satisfaction of the Director of Development Services, or shall be completely concealed from view. They shall not be located on the exterior of building walls near office areas or other prominent locations on the buildings.
8.4.3. All new mechanical equipment and appurtenances of any type (including, but not limited to, electrical cabinets, HVAC equipment, skylights, stack vents or fans) whether located on rooftops, ground level or anywhere on the building structure, shall be completely screened so as not to be visible from any public street and/or adjacent property, subject to review and approval by the Director of Development Services. The parapet wall should serve as the primary method of screening, or the facilities shall be enclosed within the structure of the building. Such enclosure of facilities shall be of compatible design related to building structure for which such facilities are intended to serve.
8.4.4. Returns for parapet walls shall not be visible from public view and shall be evaluated in the field during construction, and modified if necessary so as not to be visible. All parapet returns shall be a minimum of 4 feet deep.
8.4.5. New ladders for roof access shall be mounted on the inside of the building within the commercial projects.
8.4.6. All new overhead doors, mechanical doors and/or man doors shall be color coordinated with the building.
8.4.7. All landscaping shall be designed and installed in accordance with Chapter 20.19 of the Chino Municipal Code.
906
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
8.5. Parking and Lighting:
8.5.1. All exterior lighting fixtures shall be installed in accordance with plans on file with the Development Services Department and shall be fully operational prior to occupancy.
8.5.2. All building-mounted light fixtures within public areas shall be decorative in nature and architecturally compatible with the building. Building-mounted light fixtures shall be reviewed and approved by the Director of Development Services prior to installation. “Wall-paks” or other standardized exterior lighting shall not be permitted within public areas unless reviewed and approved by the Director of Development Services.
8.5.3. All parking and loading areas shall be paved and double-striped in accordance with plans on file with the Development Services Department, Chino Municipal Code Chapter 20.18 (Parking) and the disabled parking and accessibility requirements of state law (see the CalDAG—California Disabled Accessibility Guidebook).
8.5.4. Drive surfaces contiguous with planter areas shall have a 6-inch raised curb separation.
8.5.5. All parking spaces, aisles, entrances and exits shall be doublestriped per City standards.
8.5.6. All parking spaces for compact cars shall be clearly identified as "Compact Car Only" on the pavement, at the opening of the space.
Compact parking spaces shall be reasonably distributed throughout the parking area, subject to review and approval by the Director of Development Services.
8.5.7. Special Condition:
8.5.7.1. A parking management plan shall be prepared by the applicant and submitted to the Director of Development
Services for review and approval. The plan may include, but not be limited to the following: assignment of parking garage spaces, assignment of open parking, designation
of guest parking, guest parking passes, no parking areas, enforcement, penalties, and towing. Once the plan is
approved by the City, the applicant shall explain the
parking assignments and restrictions to each new tenant within the development prior to commencement of the
lease.
907
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
8.6. Refuse and Recycling:
8.6.1. Separate receptacles (bins) for the collection of refuse, recyclable, and organic materials shall be provided. An adequate number of bins to all for the collection of refuse, recyclable, and organic materials generated by the development shall be provided.
8.6.2. Receptables (bins) shall be located entirely within building(s) or enclosed by a 6-foot- high (1.83 m) wall and provided with a solid roof shade structure that is designed to be architecturally compatible with the building(s), with solid view obstructing gates fitted with self-closing door devices, and be designed with cane bolts in front of the block walls to secure the gates when in the open position. The gates should also be equipped with rod locks and corresponding rod holes in both the open and closed gate positions. Bins containing recyclable materials shall be provided protection from adverse environmental conditions that might render the collection materials unmarketable.
8.6.3. No refuse/recycling enclosure shall be located within any required setback area.
8.6.4. All refuse and recyclable material bin enclosures not located in private yard areas shall be screened with landscaping on all sides, with the exception of the gate area. All sides of the enclosure, with the exception of the gate area, shall be surrounded by a minimum 18” wide planter area for the purpose of providing landscape material.
8.6.5. Refuse storage and recycling areas shall not be used for the storage of materials other than that for which it is designed (refuse and recyclable materials). The premises shall be kept in a neat and orderly condition, and in good repair and appearance at all times.
8.7. Chino Climate Action Plan:
8.7.1. Per Section 15.45.070 of the Chino Municipal Code, demonstrate consistency with the Chino Climate Action Plan by implementing one of the following three options:
a) Exceed the mandatory California Energy Code Title 24, Part 6 standards in effect at the time of application submittal by 5%; or b) Achieve an equivalent reduction through voluntary measures in the California Green Building Standards Code, Title 24, Part 11 (CALGreen) in effect at the time of application submittal; or 908
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
c) Provide other equivalent greenhouse gas (GHG) reductions through measures including but not limited to, non-vehicle transportation infrastructure, transit, ZEV (zero emission vehicle) infrastructure or other incentives, waste diversion, water conservation, tree planting, renewable energy option packages, or any combination of these or other measures such that GHG emissions are reduced by 0.74 MT CO2e per residential dwelling unit per year and/or per TSF of commercial/industrial use per year.
Applicants that choose Option a described above will be required to verify that their project meets the 5% improvement above the mandatory standards through the appropriate certificate of compliance form for residential construction (CF-1R) or for commercial/industrial construction (PERF-1C). Applicants that choose Options b or c described above will be required to utilize the GHG Performance Standard Checklist developed by the City, or provide other valid documentation, such as CalEEMod or other methodologies, as verified by the Director of Development Services to demonstrate the required GHG reductions consistent with the City's CAP.
9.0 THE APPROVED USES SHALL BE OPERATED IN ACCORDANCE WITH THE FOLLOWING:
9.1. All operations shall not create a nuisance due to noise, odor, dust, mud, smoke, steam, vibration or other similar causes.
9.2. The operation or activity shall not cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution that can cause damage to human health, vegetation, or other forms of air pollution that can cause excessive soiling on any other parcel. No emission shall be permitted which exceeds the requirements of the South Coast Air Quality Management District or the requirements of any Air Quality Plan adopted by the City of Chino.
9.3. The operation or activity shall not emit odorous gases or other odorous matter in such quantities as to be dangerous, injurious, noxious, or otherwise objectionable to a level that is detectable with or without the aid of instruments at or beyond the project site boundary.
9.4. The operation shall not discharge, at any point, into any public or private street, public sewer, storm drain, private stream, body of water, or into the ground, any material which can contaminate any water supply, interfere with bacteriological processes in sewerage treatment, or otherwise cause the emission of dangerous or offensive elements, except in accordance 909
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
with the standards approved by the California Department of Public Health, or any other federal, state or local government agency.
9.5. No operation or activity shall emit heat or cold that would cause a temperature increase or decrease on any adjacent parcel in excess of 100F (5.560C).
9.6. No operation or activity shall cause any impermissible source of electronic disturbance that adversely affects persons or the operation of any equipment on any other parcel that is not in conformance with the regulations of the Federal Communications Commission (FCC).
Impermissible interference for the purposes of this document shall mean any interference that violates the rules and regulations of the FCC and/or the Communications Act of 1934, as amended.
9.7. No operation or activity shall be permitted to cause a steady state, earthborne oscillation which is continuous and occurring more frequently than 100 times per minute beyond the project site. Ground vibration caused by moving vehicles, trains, aircraft, or temporary construction or demolition is exempted from this requirement.
9.8. Noise emanating from the project site, and which is received by adjacent land uses, shall not exceed the levels specified below, except that loudspeakers, bells, gongs, buzzers or other noise attention or attracting devices shall not exceed a maximum daytime dBA level of 60 and nighttime dBA of 40, measured anywhere beyond the boundaries of the property within which the noise is created.
10.0 CONSTRUCTION SITE SECURITY:
10.1. Each site shall be completely encircled by a minimum 6’ tall securityquality chain link fence once precise grading has been completed or as determined by the Building Official.
Maximum Time of
Exposure
Noise
Metric
Noise Level Not To Be Exceeded
7 a.m. to 10 p.m. 10 p.m. to 7 a.m.
30 Minutes/Hour L50 55 dBA 50 dBA
15 Minutes/Hour L25 60 dBA 55 dBA
5 Minutes/Hour L8.3 65 dBA 60 dBA
One Minute/Hour L1.7 70 dBA 65 dBA
Any Period of Time Lmax 75 Dba 70 dBA
910
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
10.2. Tennis court or similar screening material shall be securely attached for the length of the fence, excluding gates and 10’ on either side of gates.
10.3. Each site shall have only one entry/exit gate, or as approved by the Planning Division.
10.4. Gate hinge pins shall be spot-welded or altered in such a way as to prevent easy removal.
10.5. Each gate shall have a casehardened lock and chain, or other equivalent security hardware.
10.6. “No Trespassing” signs shall be attached to the exterior of the fence at a minimum distance of a third of a mile and at all entrances.
10.7. On or near the exterior of each gate will be a sign with the address of the site in no less than 6” letters. Both the number and street name will be listed on the sign. The address posted will be used for the entire site until the fence is removed and individual addresses assigned.
10.8. Office trailers and tool bins shall be placed adjacent to gates inside the property to allow observation from outside.
10.9. Lighting on trailers and bins is desirable but shall be directed into the property so as not to impede outside observation or endanger nearby traffic with glare.
10.10. Tool bins shall be secured with casehardened locks, preferably with lock guards.
10.11. A sign stating that theft is not acceptable on the site and will be reported to the police, or wording to that effect, will be displayed prominently near each entrance.
10.12. Each site will have an assigned Crime Prevention Manager who is responsible for the following:
a. Providing his/her name and 24-hour telephone access number to the Chino Police Department.
b. Have available at all times the names and 24-hour contact numbers for all subcontractors.
c. Have the authority to speak for the development/owners on matters concerning trespassing and other criminal matters.
d. Complete routine fence inspections and arrange for prompt repairs or removal of any damage, graffiti, or loose screening. 911
DEVELOPMENT SERVICES DEPARTMENT
CONDITIONS OF APPROVAL
FILE NO.: PL22-0074 (SCUP), -0075 (SA), PL24-0080 (TTM) & -0081 (SCUP) DATE: May 21, 2025
e. Ensure that no work or maintenance of construction equipment is being performed on the site between 8 PM and 7 AM.
f. Ensure that all above security requirements are complied with, and that all security hardware, fencing, and lighting are maintained in working order.
g. Ensure that thefts are immediately reported to the police department and that reasonable steps are taken, if evident, to prevent future similar incidents.
Attachment:
Exhibit “A” – Mitigation Monitoring and Reporting Program 912
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-2 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Aesthetics
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all aesthetics impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Agriculture and Forestry Resources
Under the General Plan, the conversion of two parcels that are currently in an active Williamson Act contract, and which are not found within The Preserve Specific Plan Area would occur. The Certified EIR determined this was a significant and unavoidable impact. No mitigation was presented.
As substantiated in this Addendum, all agriculture and forestry resources impacts of the Project would be less-than-significant. No mitigation is required of the Project.
Air Quality
The Certified EIR determined that the proposed land uses would be inconsistent with the previous General Plan upon which the 2007 South Coast Air Quality Management Plan (SCAQMP) was based. As such, the General Plan would therefore fail to conform to the planning assumptions included in the 2007 SCAQMP. The GPU’s conflict with the 2007 SCAQMP was disclosed as a significant and unavoidable impact.
Additionally, increased operational-related vehicle miles travelled (VMT) would result in increased emissions of criteria pollutants for which the region is non-attainment (ozone, PM10, and PM2.5). As such, operational emissions were deemed a significant and unavoidable impact.
No mitigation was available for the preceding impacts, and a statement of overriding considerations was adopted.
As substantiated in this Addendum, all air quality impacts of the Project would be less-than-significant. No mitigation is required of the Project.
913
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-3 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Biological Resources
Mitigation is not identified in the Certified EIR. Impacts to biological resources would be less-than-significant with the incorporation of Measures BIO-1 and BIO-2:
BIO-1 Avoidance of Nesting Migratory Birds: If possible, all vegetation removal activities shall be scheduled from August 1 to February 1, which is outside the general avian nesting season. This would ensure that no active nests would be disturbed and that removal could proceed rapidly. If vegetation is to be cleared during the nesting season, all suitable habitat will be thoroughly surveyed within 72 hours prior to clearing for the presence of nesting birds by a qualified biologist (Biologist). The Biologist shall be approved by the City and retained by the Applicant. The survey results shall be submitted by the Applicant to the City Planning Department. If any active nests are detected, the area shall be flagged and mapped on the construction plans along with a minimum 300-foot buffer, with the final buffer distance to be determined by the Project Biologist. The buffer area shall be avoided until, as determined by the Biologist, the nesting cycle is complete or it is concluded that the nest has failed. In addition, the Biologist shall be present on the site to monitor the vegetation removal to ensure that any nests, which were not detected during the initial survey, are not disturbed.
BIO-2 Avoidance of Nesting Burrowing Owls: No more than 72 hours prior to any site disturbances, focused surveys for the burrowing owl shall be conducted. If absence of this species is confirmed, project work can proceed. If, however, burrowing owl is located on site, the appropriate resource agencies (CDFW and USFWS) shall be contacted. The Applicant shall consult with the wildlife agencies regarding the most appropriate methods and timing for removal of owls. As necessary, owls will be actively evicted following agency approved protocols (i.e., placing a one-way door at the burrow entrance to ensure that owls cannot access the burrow once they leave). Any such active 914
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-4 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
eviction shall occur outside of the breeding/nesting season. That is, if active eviction is required, eviction shall be accomplished between September 1 and February 15. If more than 30 days have elapsed between owl eviction and completion of clearing and grubbing activities, a subsequent survey for the burrowing owl shall be conducted to ensure that owls have not re-populated the site. Any reoccupation by owls will require subsequent protocol active eviction.
Cultural Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all cultural resources impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Energy
The environmental topic “Energy” has been added to the CEQA Guidelines Appendix G, Environmental Checklist Form since the adoption of the Certified EIR, and was therefore not specifically addressed in the Certified EIR. Mitigation is not identified in the Certified EIR.
As substantiated in this Addendum, all energy impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Geology and Soils
Mitigation is not identified in the Certified EIR. Geology and soils impacts would be less-than-significant with the incorporation of Measures GEO-1 and GEO-2:
GEO-1 Design and development of the Project shall comply with recommendations, specifications and performance standards identified within the Project Geotechnical Investigation. Where the Project Geotechnical Investigation is silent, requirements of the California Building Code as adopted and implemented by the City shall prevail.
915
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-5 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
GEO-2 A qualified paleontologist shall be retained to monitor any grading or trenching activities in excess of eight feet. If paleontological resources (fossils) are discovered during Project site-disturbing activities, work shall be halted in that area to assess the significance of the find. The Project paleontologist shall be equipped to record and salvage fossil resources that may be unearthed during site-disturbing activities. The paleontologist shall be empowered to temporarily halt or divert site-disturbing activities to allow recording and removal of the unearthed resources. Any fossils found shall be evaluated in accordance with the CEQA Guidelines and offered for curation at an accredited facility approved by the City.
Greenhouse Gas Emissions
MM AQ-2 Objective OSC-5.1 Action A1
No later than December 31, 2013, the City shall develop and approve a Climate Action Plan (“CAP”). The CAP shall include, at a minimum, the elements specified in Exhibit D of the Settlement and Release Agreement between CREED and the City of Chino dated December 19/20, 2011.1
GHG impacts would be less-than-significant with the incorporation of Measure GHG-1:
GHG-1 The Project final plans and designs shall conform to the provisions of the CAP Update through implementation of the Screening Table Measures.
The Project shall implement Screening Table Measures providing for a minimum 100 points. The City shall verify incorporation of the identified Screening Table Measures within the Project building plans and site designs prior to the issuance of building permit(s) and/or site plans (as applicable).
Alternatively, the Project would be required to comply with City of Chino Municipal Code Section 15.45.070 - GHG Performance Standards for New Development.
Hazards and Hazardous Materials
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all hazards and hazardous materials impacts of the Eden Mixed-Use Development Project would 1 It is noted that this Mitigation Measure has been revised (as presented) since the adoption of the Certified EIR. 916
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-6 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
be less-than-significant. No mitigation is required of the Project.
Hydrology and Water Quality
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all hydrology and water quality impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Land Use and Planning
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all land use and planning impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Mineral Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all mineral resources impacts of the Eden Mixed-Use Development Project would be
less-than-significant. No mitigation is required of the Project.
Noise
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all noise impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Population and Housing
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all population and housing impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Public Services
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all public services impacts of the Eden Mixed-Use Development Project would be less-than-significant.
No mitigation is required of the Project.
917
©2025 Applied Planning, Inc.
Eden Mixed-Use Development Project Mitigation Summary
Addendum to the City of Chino General Plan Certified EIR (SCH No. 2008091064) Page 5-7 Table 5.1-1
Mitigation Summary Matrix
Certified EIR Eden Mixed-Use Development Project
Recreation
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all recreation impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Transportation
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all transportation impacts of the Eden Mixed-Use Development Project would be less-than-significant.
No mitigation is required of the Project.
Tribal Cultural Resources
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all tribal cultural resources impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Utilities and Service Systems
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all utilities and service systems impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
Wildfire
Mitigation is not identified in the Certified EIR. As substantiated in this Addendum, all wildfire impacts of the Eden Mixed-Use Development Project would be less-than-significant. No mitigation is required of the Project.
918
PUBLIC WORKS CONDITIONS OF APPROVAL
Reviewed/Approved By: J.P. Date: 5/14/25
Template Updated 6/24/24
PROJECT NO. PL22-0075 (SITE APPROVAL) & PL24-0080 (TM 20634) DATE: May 14, 2025 PC MEETING DATE: May 21, 2025
PROJECT DESCRIPTION: Orbis Commercial Center
PROJECT LOCATION: NWC Euclid Avenue (SR-83) & Schaefer Avenue APPLICANT: Clark Schaefer Partners, LLC PROJECT ENGINEER: Isidro Abreo
PRIOR TO THE FOUR MAJOR DEVELOPMENT EVENTS, THE APPLICANT SHALL SATISFY AND FULFILL ALL CONDITIONS OUTLINED BELOW. FAILURE TO COMPLY WITH ANY CONDITIONS OF
APPROVAL SHALL BE DEEMED JUST CAUSE FOR REVOCATION OF PROJECT APPROVAL BY THE PLANNING COMMISSION. HOWEVER, THE PUBLIC WORKS DIRECTOR SHALL HAVE THE
AUTHORITY TO APPROVE MINOR DEVIATIONS IN THE CONDITIONS OF APPROVAL AND ALL PLANS, INCLUDING THE CONSTRUCTION DRAWINGS.
1.0 PRIOR TO MAP RECORDATION (FOR TM 20634):
1.1 Provide a preliminary Title Report no older than 60 days.
1.2 Submit a soils/geology report in accordance with Appendix J of the California Building Code, latest edition to the project engineer for review and approval.
1.3 Make the following dedications:
Street Name Distance Direction From C/L
Fern Avenue(1) 52’ East
Schaefer Avenue(1) 53’ North
Euclid Avenue(1)(3) Varies(2) West
(1) Include corner cut-offs at the northeast corner of the Fern Ave & Schaefer Ave intersection and at the northwest corner of the Euclid Ave & Schaefer Ave intersection. (2) Street dedication ranges between 100 feet and 113 feet along the frontage on Euclid Ave. (3) Additional street dedication or an easement deed is required along the property's frontage to the north (A.P.N.1052-581-04) for the construction of public improvements on Euclid Ave. Those improvements include but are not limited to sidewalk, the project driveway, parkway landscape, curb, gutter, street paving, and utilities.
1.3b Prepare and record necessary drainage easements to implement the project in accordance with drainage law.
1.4 Provide and record a reciprocal use agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.
1.5 Provide a set of proposed Covenants, Conditions and Restrictions (CC&R) for review and approval.
The proposed CC&Rs shall contain the Association’s/Owner’s maintenance obligations with respect to various facilities including, but not limited to, right-of-way landscaping, private streets, sidewalks, utilities, street lights, and Water Quality Management Plan (WQMP) features. This document must be submitted to and approved by the City before it is submitted to any other governmental entity.
919
PL22-0075 (SA) & PL24-0080 (TM 20634) 2 May 14, 2025
1.6 Prepare and record a Covenant & Agreement for the two proposed contiguous parcels, which will include the storage facility building and the retail/food shops building. These parcels are proposed to share a common boundary and structural walls. The Covenant & Agreement shall establish the rights, responsibilities, and obligations of all current and future parties with an interest in either or both parcels. At a minimum, the document shall address the terms and conditions for the sale transaction of one or both of the subject parcels. The document shall also be reviewed and approved by the City prior to recordation.
1.7 Execute a Subdivision Agreement and submit security in an amount acceptable to the City Engineer to guarantee construction of the public improvements listed in 2.8. All security must be accessible to the City at any time and in a form acceptable to the City Engineer, pursuant to Government Code, Section 66499.
1.8 Provide a Monumentation Bond in an amount specified in writing by a Registered Engineer or Licensed Land Surveyor of Record.
1.9 Complete and file the petition for annexation of your project property to the City's Landscape and Street Lighting Maintenance District MD 2002-1.
1.10 Submit a list of proposed street names for the main driveway (new signalized intersection) for the project to the Street Naming Committee for name(s) selection.
1.11 Comply with all applicable requirements of the City Municipal Code.
1.12 Provide a Pedestrian Accessibility Plan that labels and indicates the path location and conceptual design of the following structures and facilities:
a. Sidewalks and walks (public right of way sidewalk, walks within the development); b. Curb ramps (should be directional with one curb ramp provided for each pedestrian crossing and shall comply with the City’s Policy on Accessible Pedestrian Facilities); c. Pedestrian crossings at driveways;
d. Crosswalks (marked, unmarked, signalized); and
e. Path of travel from right-of-way to recreation facilities (parks, restrooms) and each feature pad area or commercial building pad.
1.13 The Pedestrian Accessibility Plan requested in 1.12 should clearly indicate structures that are proposed with this site and future per other phases and/or site plans. Pedestrian facilities (privately or publicly owned) that are open to the public shall comply with accessibility standards in the City’s Policy on Accessible Pedestrian Facilities, the current edition of the CBC in effect at the time of building permit issuance or, if no permit, the date construction commences, and Part 36 of Title 28 of the Americans with Disabilities Act (ADA) regulations, which include the 2010 ADA Standards.
1.14 Existing pedestrian facilities on the frontage of the development, open to the public within the development, shall be evaluated for accessibility. The street frontage includes all adjacent pedestrian facilities, created by, extended from, or connected to any required or provided sidewalks improvements. The frontage may include sidewalks, curb ramps, connecting crosswalks (marked and unmarked), and other associated pedestrian facilities. a. The following existing improvements shall be made compliant with accessibility regulations as a part of this project:
i. sidewalks/walks
a. On Fern Ave, Schaefer Ave, and Euclid Ave.
ii. shared-use paths/multi-purpose paths
iii. curb ramps
a. Two (2) directional curb ramps at the northeast corner of Fern Ave and Schaefer Ave.
920
PL22-0075 (SA) & PL24-0080 (TM 20634) 3 May 14, 2025
b. One directional curb ramp at the northeast corner of New Driveway and Schaefer Ave
c. One directional curb ramp at the southeast corner of New Driveway and Schaefer Ave
d. Two (2) directional curb ramps at the northwest corner of Euclid Ave and Schaefer Ave.
iv. crosswalk pavement and associated pedestrian facilities (pedestrian push buttons, maneuvering space, clear space)
v. driveway approaches crossings
a. Two (2) on Fern Ave.
b. One (1) on Schaefer Ave
c. Two (2) on Euclid Ave
vi. parking space (onsite, no on-street parking)
b. Improvements that are non-compliant with the accessibility standards in effect at the time of construction or alteration, shall be brought up to current accessibility standards. This work shall be incorporated into the scope of this project and shall be completed prior to acceptance by the City.
c. Improvements that are compliant with the accessibility standards in effect at the time of construction, shall be documented on a separate construction plan with detailed specifications (running and cross slopes of all pedestrian walking surfaces, locations, dimensions and slopes of maneuvering spaces and landings, width of sidewalk, clear width and vertical clearance from obstructions). The accessibility of existing improvements will be verified by City inspection staff upon completion of the project. Discrepancies between documented existing conditions and existing conditions as measured by City staff shall be remediated and brought up to accessibility standards as part of the project.
1.15 Pay all applicable fees pursuant to City Municipal Code including, but not limited to, plan check fees.
2.0 PRIOR TO ISSUANCE OF BUILDING PERMITS FOR ANY LOT WITHIN THE SUBDIVISION/ PRIOR TO ISSUANCE OF CONSTRUCTION PERMITS:
2.1 Record Tract Map No. 20634 pursuant to the Subdivision Map Act and in accordance with City Municipal Code. Provide a duplicate photo Mylar of the recorded map to the City Engineer's office.
2.2 All required plans and studies shall be prepared by a Registered Professional Engineer and submitted to the project engineer for review and approval. All project plans must be approved by the City Engineer's office before a Building Permit will be issued. All maps, studies, calculation sheets, reports, etc. must be on and/or folded in an 11-inch x 8 1/2-inch standard format.
2.3 Provide a focused parking and circulation study comprising the project access/egress, internal circulation and project parking analyses. The study is subject to the review and approval of the City Traffic Engineer.
2.4 Prepare and submit a drainage study, including supporting hydraulic and hydrological data to the project engineer for approval. The study shall confirm or recommend changes to the City's adopted Master Drainage Plan by identifying off-site and on-site storm water runoff impacts resulting from build-out of permitted General Plan land uses. In addition, the study shall identify the project's contribution and shall provide locations and sizes of catchments and system connection points and all downstream drainage-mitigating measures.
921
PL22-0075 (SA) & PL24-0080 (TM 20634) 4 May 14, 2025
2.5 Prepare and submit a final grading plan showing building footprints, pad elevations, finished grades, drainage routes, retaining walls, erosion control, slope easements and other pertinent information in accordance with Appendix J of the California Building Code, latest edition.
2.6 Provide a certificate, from a Registered Civil Engineer, certifying that the finished grading has been completed in accordance with the City approved grading plan.
2.7 Design and install a monitoring manhole (per City Standard No. 530) on each domestic sewer lateral connection into a private sewer main that is tributary to the City's main sewer. In addition, a sampling Wye will be designed and installed on a stubbed-out sewer lateral connection into the main sewer for each industrial building in this development.
2.8 Design per City Standards and construct full public improvements for all impacted and interior streets/facilities in accordance with City Code, Standards and Specifications. Such public improvements shall include, but not be limited to, the following: (Please coordinate and verify all requirements with the project engineer.)
Street Names
Fern
Avenue(1)
Schaefer
Avenue
Euclid
Avenue(1)(8)
Curb & Gutter (Offset from Centerline) X(36’) X(84’-98’)(2) Sidewalk (Width) X(6’) X(8’) X(5’)
Asphalt Concrete Pavement on Aggregate
Base (Width from Centerline)(3)
X(3) X X
Asphalt Concrete Overlay X X X
Driveways (# of dwys)(4) X(2) X(1) X(2)
Street Lights(5) X X X
Median Island and Landscaping X(6) X(7)
Parkway Landscaping(9) X X X
Striping and Traffic Controls(10) X X X
Traffic Signal/Signal Modification X(11) X(12) X(13)
Traffic Signal Interconnect(14) X
Sewer(15) X
Storm Drain(16) X X
Domestic Water(17) X X X
Recycled Water
Fire Hydrants as required by CVIFD(18) X X X
(1) All pedestrian facilities along the project frontage shall be made accessible per the City’s Policy on Accessible Pedestrian Facilities. All existing public street improvements not up to current standards shall be remediated. This includes, but is not limited to, the removal and/or repair of any substandard or broken curb, gutter, sidewalks, pedestrian push buttons, crosswalks, and/or curb ramps. (2) An additional southbound right-turn lane is required to provide access to the two new driveways on Euclid Ave. The extent of this lane is between the northerly property line of APN 1052-581-04 and the new driveway closest to the Euclid Ave & Schaefer Ave intersection. (3) Grind and overlay or replacement of the existing street paving shall be required on Fern Avenue, Schaefer Ave, and Euclid Ave along the project frontage from the edge of pavement to the centerline of the streets. This will be based on the R-value and existing pavement condition of said streets as determined by core samples and the extent of any proposed utility improvements. Based on the extent 922
PL22-0075 (SA) & PL24-0080 (TM 20634) 5 May 14, 2025
of the storm drain improvements for this project, the full extent of the Fern Ave and Schaefer Ave intersection will also be included. All paving requirements will be at the discretion of the City Engineer. (4) The proposed driveways shall be constructed per City of Chino Standard No. 250 with 5-ft minimum sidewalks. Truncated domes are to be provided where the driveway approach is signalized or stop controlled, per ADA requirements.
(5) Streetlights on Fern Ave, Schaefer Ave and Euclid Ave shall be designed and constructed for public use using Southern California Edison’s LS-2 rate plan.
(6) Modify the existing median on Fern Avenue, near the north property line, to provide a turn pocket for southbound left turns into the project and allow for westbound left turns from the project. Note: The existing median has an opening precisely in line with the northerly property line that would need to accommodate the southbound left and westbound left turning movements. (7) A southbound left turn lane pocket is required at the Euclid Avenue & Schaefer Ave intersection. This lane requires a median to be constructed between the left-turn lane and the adjacent southbound through lane. The length of the median will be from the Euclid Ave & Schaefer intersection to just north of the new project driveway to enforce a right-in/right-out-only access at the new driveway closest to the intersection. The final design of this turn lane shall be designed and constructed to the satisfaction of the City Engineer. The street improvements shall be designed in conformance with Caltrans Highway Design Manual standards and specifications.
(8) Euclid Avenue is designated as a Major Arterial with a raised median with curbs and landscaping. In lieu of constructing said median improvements and installing landscape and irrigation systems, the developer shall pay an “in-lieu” fee to the City for the City to construct in the future. (9) The property owner is responsible for the parkway landscape maintenance. Parkway landscape and irrigation must be installed along the project frontage on Fern Ave, Schaefer Ave, and Euclid Ave. (10)New signing & striping is required at the new signalized intersection at the new driveway & Schaefer Ave. Both the Fern Ave & Schaefer and the Euclid Ave & Schaefer Ave intersections require restriping to accommodate the new curb ramps, sidewalks, and crosswalks. The City Traffic Engineer will determine the limits of the signing & striping.
(11)Modify the existing traffic signal on Fern Ave and Schaefer Avenue to accommodate the new curb ramps and corresponding pedestrian push buttons.
(12)A new signal is required at the new project driveway and Schaefer Avenue, between Fern Ave and Euclid Ave. Refer to Condition 1.13 for corresponding street improvements at the intersection, including those on the south side of Schaefer Ave.
(13)Modify the existing traffic signal on Euclid Ave and Schaefer Avenue to accommodate a modified southbound left turn pocket lane, new crosswalks, and curb ramps with corresponding pedestrian push buttons.
(14)As directed by the City Traffic Engineer, install conduit and pull boxes along the project frontage to accommodate future traffic signal fiber optics.
(15)A new public sewer lateral is to be constructed on Fern Ave, in line with the new drive aisle near the northern property line. The extent of this public line is from the point of connection to the City main and the proposed sewer monitoring manhole at the R.O.W./property line. The proposed onsite sewer lines shall be private. Refer to Condition 2.15 for private utility maintenance requirements. (16)A new storm drain line is being proposed along Schaefer Ave, connecting with the city’s existing storm drain main line at the Fern Ave & Schaefer Ave intersection. These improvements will require updating the City’s Master Plan of Drainage, as indicated in Condition 2.23. (17)Multiple water meters and service laterals constructed proposed on Schaefer Ave and one on Euclid Ave. Refer to City of Chino Std. 415A&B for 3” or larger meters. Water lines that go from the meter to the structures shall be private. Refer to Condition 2.15 for private utility maintenance requirements. 923
PL22-0075 (SA) & PL24-0080 (TM 20634) 6 May 14, 2025
(18)The applicant/property owner shall be solely responsible for any future maintenance and repair of fire service laterals at the project site in accordance with City Code, Chapters 13.04.175 and 13.12.150.
2.9 All improvements shall comply with federal, state, and local accessibility regulations and standards.
The review or approval of plans and specifications by the City does not permit the violation of any section of the federal law, state law, building code, or local ordinance. Where accessibility standards are contradictory, the provision that provides the most accessible (restrictive) condition shall apply. Where the project’s conditions of approval conflict with accessibility regulations and standards, the prevailing provision shall be determined by City’s Accessibility Coordinator and City Engineer.
2.10 Obtain design and plan approval from appropriate utility companies for undergrounding all overhead (dry) utility lines adjoining and interior to the project, including power lines of 34.5 kV or less, pursuant to City Municipal Code, Chapter 13.32. To accommodate the public improvements on Schaefer Avenue, relocation of the existing poles is required, in addition to the undergrounding of utility lines. Power lines exceeding the 34.5kV threshold can remain above ground with the relocated poles.
2.11 Prepare and submit a sewer collection system analysis to determine if downstream facilities are adequate to handle the proposed development. The analysis will evaluate the proposed point(s) of connection and determine if there are any system deficiencies or needed improvements in order for the proposed development to be connected to the City’s sanitary sewer collection system.
2.12 Pay all applicable fees pursuant to City Municipal Code including, but not limited to, the Development Impact Fees (DIF) and Sewage Facilities Development Fee (SFDF). The actual amount of fees due to the City will be based on the fee schedule in place on the date that the fees are due, or the date that they are paid, whichever occurs last. The fee amount stated in this notice is subject to change based on (1) annual adjustments for inflation, pursuant to Chino Municipal Code, Chapter 3.40.100 or 3.45.100, (2) revisions to the Chino Municipal Code, and (3) updates to the fee studies and nexus reports adopted by the City.
Developer is solely responsible for remaining informed about changes in the fee amounts. City shall have no obligation to inform Developer of changes in the fee amounts unless Developer requests notice of such changes, pursuant to Government Code Section 66019(b) and Chino Municipal Code Chapter 3.40.080(B) or 3.45.080(B).
2.13 All projects developing one (1) acre or more of total land area, or which are part of a larger phased development that will disturb one acre of land, are required to obtain coverage under the State Water Resources Control Board’s (SWRCB) General Permit for storm water discharges associated with construction activity. Proof of filing a Notice of Intent (NOI) with the SWRCB for coverage under this permit is required. A copy of the Waste Discharger’s Identification Number (WDID), issued by the SWRCB, must be submitted to the Project Engineer prior to issuance of grading permits. More detailed information regarding this General Permit, applicable fee information and the necessary forms to complete the NOI are available by calling (916) 341-5537 or on the SWRCB web site at http://www.swrcb.ca.gov/water_issues/programs/stormwater/constpermits.shtml
2.14 Pursuant to Santa Ana Regional Water Quality Control Board Order Number R8-2010-0036, NPDES Permit No. CAS618036, prepare a project-specific Water Quality Management Plan (WQMP) and submit to the project engineer for review and approval. To address NPDES Permit requirements to the maximum extent practicable, the project shall be designed to specify preferential use of Low Impact Development Best Management Practices that reduce pollutants and runoff volume through structural measures (e.g. infiltration, harvesting, and bio-treatment) and non-structural measures (e.g. preserving natural areas, clustering development, and reducing 924
PL22-0075 (SA) & PL24-0080 (TM 20634) 7 May 14, 2025
impervious areas). The WQMP shall conform to the requirements of the San Bernardino County Stormwater Program, 2013 WQMP Technical Guidance Document and include the Trash Order Implementation Plan requirements.
2.15 Any future maintenance and repair of sewer laterals, except for the portion of lateral located within the public right-of-way or public easement, and domestic water or fire service laterals to the project site shall be the sole responsibility of the applicant/property owner in accordance with City Code, Chapter 13.04.175 and 13.12.150.
2.16 Convey ownership of all onsite water wells that may exist to the City and convert to monitoring wells as directed by the City’s Public Works Environmental staff and Water Utilities Supervisor.
Prepare and record any necessary easements to provide the City with access to the monitoring wells. Any existing water wells that cannot be feasibly converted to monitoring wells shall be destroyed (per City Standard No. 465).
2.17 City staff shall determine the type of water (potable or recycled) to be used for grading operations, dust control activities, and common area/public landscape irrigation at the time of permit issuance.
2.18 All public street corners shall have a minimum curb radii per City Municipal Code, Chapter 19.06 and City Standards and Specifications.
2.19 Provide adequate sight distance (per City Standard No. 865) for each project driveway and at all intersections. Landscaping type and height shall be maintained to ensure sight distance requirements are perpetuated.
2.20 Submit to the City electronic files, in Adobe Acrobat PDF format, of all submittals, including reports, studies, improvement plans, and City redlines of previous submittals. Include AutoCAD and Esri GIS shape files as an e-transmitted zip file of all approved improvement plans.
2.21 The developer shall be responsible for the modification of traffic signals at the Fern Ave & Schaefer Ave and Euclid Ave & Schaefer Ave intersections. During construction, the developer shall be responsible for any damages attributed to the construction of related public improvements and shall coordinate with the Transportation Division and the City’s designated traffic signal maintenance company for technical support of the traffic signal during construction until such time as the City accepts the improvements to the satisfaction of the City Engineer.
2.22 Comply with all requirements of the Traffic Impact Analysis (TIA) dated June 13, 2024 including participation in fair share contributions and construction of required improvements and mitigation measures as shown on the Mitigation Monitoring and Reporting Program, to mitigate impacts.
2.23 Provide an addendum to the City of Chino’s Master Plan of Drainage (MPD) to include the proposed storm drain line that is required for this project, which will connect to the City’s existing storm drain line under System 82. Include an analysis of cost impacts to the system and provide updated system drawings to “slip sheet” them into the MPD.
3.0 PRIOR TO REQUEST AND RELEASE OF ANY OCCUPANCY PERMITS:
3.1 Construct and secure Public Works Department approval of all public facilities enumerated under Section 2.8 above (per Resolution No. 88-23).
3.2 Underground all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Municipal Code, Chapter 13.32.
3.3 Distribute for signature of all buyers, the information and disclosure notice announcing that the development will be annexed to the City's Landscape and Street Lighting Maintenance Assessment District before transfer of property title and completion and acceptance of all public improvements. 925
PL22-0075 (SA) & PL24-0080 (TM 20634) 8 May 14, 2025
3.4 Distribute for signature of all buyers, the information and disclosure notice announcing that the project property will be subject to an annual special East Chino Specific Plan area Community Facilities District Tax.
3.5 The applicant’s Civil Engineer shall field verify that all BMPs are designed, constructed, and functional in accordance with the approved WQMP. BMPs shall also be inspected by Public Works Environmental staff. Coordinate inspection with staff and submit a completed City of Chino BMP field verification form for review and approval.
3.6 Rehabilitate all street pavement impacted by utility trench repairs as directed by City staff. Install signing and striping per approved plans.
3.7 Provide and record a reciprocal use and maintenance agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.
3.8 Pay all remaining applicable fees pursuant to City Municipal Code.
4.0 PRIOR TO FINAL ACCEPTANCE/PROJECT CLOSEOUT:
4.1 Complete all Conditions of Approval listed under Sections 1-3 above.
4.2 Submit to the City a letter from the surveyor indicating monuments required for the map have been set and they have been fully paid for their services.
4.3 Submit to the City, electronic files of Tract/Parcel Map and “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an e-transmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.
926
Rev. 5/14/2025
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
DEVELOPMENT ENGINEERING DIVISION
PROJECT NO. PL22-0075 (SA) & PL24-0080 (TM 20634)
PROJECT ENGINEER: Isidro Abreo
DATE: 5/14/2025
A COPY OF THIS CHECKLIST MUST BE PROVIDED ALONG WITH A COMPLETED PLAN CHECK REVIEW APPLICATION TO THE
ENGINEERING TECHNICIAN WHEN MAKING AN APPOINTMENT FOR FIRST PLAN CHECK SUBMITTAL Copy of Development Engineering Division Conditions of Approval Plan Check Fee Calculation Form
Maps (Subdivision Only)
Preliminary Title Report (no older than six months) (Subdivision Only) Closure Calculations (Subdivision Only)
Referenced Maps (Subdivision Only)
Preliminary Soils Report (no older than sixty days)
Lot line adjustment certificate
Lot merger
Right-of-way dedication
Rough Grading Plan
Precise Grading Plan
Storm Drain Plan- New public storm drain line on Schaefer Ave Hydrology and Hydraulic Calculations with Backup Data (Signed and Sealed by a Registered Civil Engineer)
Engineering Cost Estimate (On City Forms) with Engineer’s Wet Signature and Stamp Street Improvement Plan
Cross-sections (if street plans are required) at 50’ intervals and extended a minimum of 100’ beyond the limits of improvements
Sewer Plan- Revise record drawings to add the sewer service lateral and monitoring manhole Domestic Water Plan- Revise record drawings to add the water service laterals and meters Street Light Plan
Voltage Drop Calculations (Signed and Sealed by a Registered Engineer) Signing and Striping Plan
Traffic Signal Interconnect Plan- Euclid Avenue
Traffic Signal Plan- New signal plan for ‘New Driveway’ and Schaefer Ave Traffic Signal Mod Plan- Revise existing signal plan for Fern Ave & Schaefer Ave Traffic Signal Mod Plan- Revise existing signal plan for Euclid Ave & Schaefer Ave Water Quality Management Plan
Construction Management Plan
927
Special Districts Leadership Foundation - District of Distinction Since 2008 May 13, 2025
It is a recommendation of the Fire District that the developer of every new construction project facilitate a preconstruction meeting. The meeting is to be scheduled with the Fire District Inspector for said project.
The following are the conditions of the above referenced permit/project. All conditions shall be adhered to, failure to comply with said conditions may result in the revocation of said permit and/or punitive fines as outlined in the Fire District fee schedule.
We look forward to a cooperative working relationship throughout the project. Should you have any questions regarding the project, including the conditions as set forth herein, please feel free to contact our office at (909) 902-5280.
1.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO RECORDATION:
1.1 Fire access roads shall be designed and plans submitted to the Fire District for approval.
Fire access roads shall be constructed of an all-weather hard surface, such as, asphalt or concrete, and be a minimum unobstructed width of 26 feet and minimum clear height of 13’6”. The road grade shall not exceed twelve percent (12%) maximum. An approved turn around shall be provided at the end of each roadway in excess of 150 feet in length. Aerial access shall be provided for any buildings 30’ ft. and higher per 2019 CFC. Appendix D. A 26’ ft. wide access road shall be a minimum of 15’ ft. to the building and a maximum of 30’ ft. from the building. Access roads shall comply with Fire District Standard No. 111.
Chino Valley Fire District
14011 City Center Drive
Chino Hills, CA 91709
(909) 902-5260 Administration
(909) 902-5250 Fax
Chinovalleyfire.org
2022-00003067
Fire Protection Requirements
CLARK SCHAEFER PARTNERS, LLC
280 NEWPORT CENTER DR STE 240
NEWPORT BEACH, CA - California 92660
Project Name: ORBIS COMMERCIAL
PL22-0074-0075, PL23-0111, PL24-0080-0081
Project Address: NW CORNER OF EUCLID &
SCHAEFER AVE, Chino, CA. 91710
Board of Directors
Harvey Luth
President
Sarah-Ramos Evinger
Vice President
John DeMonaco
Tom Haughey
Mike Kreeger
Fire Chief
Dave Williams
928
Special Districts Leadership Foundation - District of Distinction Since 2008
1.2 The development and each phase shall have two (2) points of vehicular access during construction. Fire District Standard No. 111 shall be complied with.
1.3 Water systems shall be designed to meet the required fire flow of this development and be approved by the Community Risk Reduction Division. Buildings in excess of 100,000 square feet shall have a minimum of two (2) connections to a public main. The developer shall furnish the Community Risk Reduction Division with three (3) copies of the water system working plans done by the installing contractor for approval, along with the Fire Flow Availability Form completed by the water purveyor prior to recordation. The required fire flow shall be determined by using the California Fire Code, current adopted edition. For all private systems, the water systems shall comply with Fire District Standard Nos. 101, 102, and 103. In areas without water-serving utilities, fire protection water systems shall be based on NFPA Pamphlet 1231. For water connections and work conducted in the public right of way, please refer to separate plans reviewed and approved by the water purveyor.
1.4 Fire hydrants shall be six-inch (6") diameter with a minimum one four-inch (4") and one two and one-half inch (2-1/2") connections. All fire hydrants shall be spaced a maximum of three hundred feet (300') apart. Private water systems shall comply with Fire District Standard Nos. 101, 102, and 114. All hydrants shall be installed with pavement markers to identify their locations.
1.5 Access drives which cross property lines shall be provided with CC & R's, access easements or reciprocating agreements and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.
1.6 Underground fire mains which cross property lines shall be provided with CC & R's, easements, or reciprocating agreements addressing the use and maintenance of the mains and hydrants and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.
2.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMIT:
2.1 Fire access roads shall be constructed and approved by the Community Risk Reduction Division prior to combustibles being brought onto the site.
2.2 Approved street signs shall be installed prior to issuance of building permits, as well as a job site address.
2.3 Fire Protection water systems shall be tested, operational, and approved by the Community Risk Reduction Division prior to combustible materials being brought to the site.
2.4 All flammable vegetation shall be removed from each building site for a minimum distance of thirty feet (30') from any flammable building material including all structures. 929
Special Districts Leadership Foundation - District of Distinction Since 2008
2.5 A detailed site plan of the development is required to be submitted in electronic (pdf.) format. The plan must show and be limited to: locations of property lines, buildings, and equipment and hazards for emergency response purposes. Please refer to Fire District Standard No. 143. Additional or revised files may be required during construction and/or prior to final signoff.
2.6 The Developer shall submit, as an electronic file, a drawing of the new streets in pdf format to the Fire District with the building construction plans. Format must contain and be restricted to the following layers: A. Right of way; B. Parcel Lines; C. Street Names; D. Address numbers; E. Fire Hydrants. Additional or revised files may be required during construction and/or prior to final signoff.
3.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO OCCUPANCY:
3.1 An automatic protection fire sprinkler system is required for all buildings 5,000 sq. ft or greater. and/or when used for allowable area increase, if applicable. This system shall comply with NFPA Standard No. 13 and Fire District Standard No. 110. An electronic/PDF set of detailed plans along with hydraulic calculations and material specifications shall be submitted to the Community Risk Reduction Division. The system shall be installed, tested and approved prior to system final. Fire sprinkler systems shall be installed by a licensed C-16 contractor and the contractor is required to submit a report to The Compliance Engine (TCE).
3.1 A residential "life safety" fire sprinkler system is required. The developer shall submit an electronic/PDF set of detailed plans and hydraulic calculations to the Community Risk Reduction Division for approval. The system shall be installed, tested and approved prior to occupancy. The system shall meet the standards of NFPA 13R or 13D and Fire District Standard No.126. Dwellings in excess of 5,000 square feet shall provide calculations of the (4) four most remote sprinkler heads. For NFPA 13R systems, the contractor is required to submit a report to The Compliance Engine (TCE).
3.2 An automatic fire alarm system is required. An electronic/PDF set of detailed plans shall be submitted showing the design, system components, signaling devices, fire alarm power supply, control panel and auxiliary devices and functions of the alarm system. Please refer to Fire District Standard No. 133 and current adopted editions of the California Building Code, as well as NFPA Standard 72. The contractor is required to submit a report to The Compliance Engine (TCE).
3.3 Approved in-building, two-way emergency responder communication coverage for emergency responders shall be provided in all new buildings, if ERRC evaluation determines the need for installation of system. In-building, two-way emergency responder communication coverage within the building shall be based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. System shall comply with current adopted edition of the California Fire Code, NFPA 70, 72 & 1221 and the contractor is required to submit a report to The Compliance Engine (TCE).
3.4 An automatic fixed fire extinguishing system may be required. An electronic/PDF set of detailed plans shall be submitted to the Community Risk Reduction Division for approval. 930
Special Districts Leadership Foundation - District of Distinction Since 2008 System shall comply with current adopted edition of the California Fire Code, NFPA Standard 17-A, and UL 300. Please refer to Fire District Standard No. 112. The contractor is required to submit a report to The Compliance Engine (TCE).
3.5 Insulated liquid carbon dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with CFC, Section 5307.3.1., and shall be provided with mechanical ventilation or a gas detection system. The contractor is required to submit a report to The Compliance Engine (TCE).
3.6 A maximum occupant load sign shall be posted in a conspicuous location neat the main entrance/exit of the room, if occupant load is greater than 49 people. Such sign shall be legible.
3.7 Hand-held portable fire extinguishers are required to be installed. The location, type and cabinet design shall be approved by the Community Risk Reduction Division.
3.8 Smoke and Carbon Monoxide alarms are required to be installed per Section 310 of the California Building Code, current adopted edition. Locations shall be in accordance with code requirements.
3.9 Exits, doors, signs and approved path marking shall be installed in accordance with the current adopted edition of the California Building Code, Section 1007
3.10 "No Parking - Fire Lane" signs shall be installed in interior access drives at locations designated by the Community Risk Reduction Division. Curbs shall be painted red at locations designated by the Community Risk Reduction Division. Please refer to Fire District Standard No. 121.
3.11 An approved recessed Fire Department "KNOX" brand key box is required. The key box shall be located at or near the main entrance(s), and shall be provided with a tamper switch and shall be monitored by an approved central station monitoring service. Please refer to Fire District Standard No. 117.
3.12 An approved Knox key switch and/or Knox lock is required on each automatic electric or manual gate that crosses an EVA. All automatic gates shall be provided with a manual override. Fire District Standard No. 116 & 117 shall be complied with.
3.13 Commercial, industrial, and multi-family building addresses shall be posted with a minimum eight inch (8") numbers, visible from the street and during the hours of darkness they shall be internally or externally electrically illuminated. Posted numbers shall contrast with the background used and be legible from the street.
Where building set back exceeds 100 feet from the roadway, additional non-illuminated six inch (6") numbers shall be displayed at the property access entrance. These numbers shall also contrast with the background used. Fire District Standard No. 122 must be complied with.
3.14 Residential street addresses shall be posted with a minimum of four inch (4") numbers, shall be electrically illuminated (by 12-volt power source only) by internal means during the hours of darkness. Posted numbers shall contrast with the background used and be 931
Special Districts Leadership Foundation - District of Distinction Since 2008 legible from the street in accordance with the California Fire Code, current adopted edition. Where building is set back more than 100 feet from the roadway, additional nonilluminated four inch (4") numbers shall be displayed at the property access entrance.
These numbers shall also contrast with the background used. Please refer to Fire District Standard No. 122.
3.15 An electronic/PDF set of plans shall be submitted separately for each of the following listed items to the Fire District for review, approval and permit prior to any installation or work being done. Approved plans must be maintained at the worksite during construction. Fees are due at the time of submittal.
a) Building Construction, includes tenant improvement work b) Private (onsite) Underground Fire Protection Water Systems, if applicable c) Fire Sprinkler Systems, designed by C16 contractor or registered engineer d) Fire Alarm Systems or Sprinkler Monitoring Systems designed by a C7, C10 contractor or registered engineer.
e) Knox box and/or security gate locations.
f) Gas detection systems
g) Emergency Responder Radio Coverage Systems
Applicable Standards:
101, 102, 103, 110, 111, 114, 117, 121, 122, 126, 133, 141, 143 CVFD Standards available online at http://www.chinovalleyfire.org 932
POLICE DEPARTMENT
CONDITIONS OF APPROVAL
DATE: May 21, 2025
PROJECT FILE NO.: PL22-0074 (Special Conditional Use Permit), PL22-0075 (Site Approval), PL24-0080 (Tentative Tract Map No. 20634) and PL24-0081 (Special Conditional Use Permit)
LOCATION: North side of Schaefer Avenue between Euclid and Fern Avenues (APN: 1052-581-03)
APPLICANT: Orbis Real Estate Partners
1.0 GENERAL REQUIREMENTS:
1.1. FLOCK cameras shall be installed and adequately positioned to cover main entrances and exits to the property (Schaefer and Euclid Avenues).
1.2. Install and adequately position license plate reader quality security cameras capable of capturing nighttime video to cover door entrances (directed towards faces), rear of the properties, parking lots, entrance and exit to residential parking structure, and safe storage locations with 24/7 monitoring. Consider private security during nighttime/early morning hours. Allow access to camera system to our Real Time Crime Center Analysts for in progress calls for service/crimes in progress. Contact Leah Green Chino PD (909-334-3060).
1.3. *A CPTED (Crime Prevention Through Environmental Design) inspection can be scheduled to assist with recommendations on camera placement for best coverage.
933
MEMORANDUM
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
CITY COUNCIL MEETING DATE: JULY 15, 2025
TO: LINDA REICH, CITY MANAGER
FROM: HYE JIN LEE, PE, DIRECTOR OF PUBLIC WORKS
SUBJECT
..titl e
..titl e
Landscape and Streetlight Maintenance District Assessment for Fiscal Year 2025-26. ..end
RECOMMENDATION
..recommendation
1) Conduct the Public Hearing; 2) adopt Resolution No. 2025-042; and 3) direct the City Clerk to file a certified copy of the diagram and assessments with the County Auditor/Controller Recorder.
..body
FISCAL IMPACT
There are sufficient funds in the FY 2025-26 Public Works Department budget within the various Maintenance District Programs.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Positive City Image
Superior Customer Service
Responsible Long-Range Planning
Revenue: 36172601, 36172602, 36172603, 36172604,
36172606, 36172607
Expenditure: 3607260, 36172601, 36172602,
36172603, 36172604, 36172606, 36172607
Transfer In: Transfer Out:
934
CITY COUNCIL MEETING DATE: JULY 15, 2025
TITLE: LANDSCAPE AND STREETLIGHT MAINTENANCE DISTRICT ASSESSMENT FOR FISCAL YEAR 2025-26.
PAGE: 2
BACKGROUND
The Landscape and Lighting Districts are special assessment districts that were established to fund the installation, maintenance, and servicing of public landscaping and lighting improvements. These funds help keep public spaces clean, green, and well-lit, contributing to the safety and appearance of the community. Over the years, pursuant to the Landscaping and Lighting Act of 1972 of the California Streets and Highways Code, the City formed six Landscape and Streetlight Maintenance Assessment Districts. This procedure authorized the City to recover costs that are incurred to provide the landscaping and street lighting maintenance services through a special benefit assessment district procedure.
At the City Council meeting on June 17, 2025, three (3) resolutions were adopted that approved the Engineer’s Report; declared the City’s intention to order improvements; and scheduled a Public Hearing for July 15, 2025.
In past years, the City Council has approved a subsidy to the districts for landscape and lighting maintenance costs. As the costs associated with insurance, maintenance, water, and electricity change, the subsidy has also changed. Staff has reviewed the Fiscal Year 2023-24, 2024-25, and the new Fiscal Year 2025-26 information for expense, revenue, and subsidies from the engineer’s reports provided by Webb Associates. The information is provided as follows:
FY23-24 FY24-25 FY25-26
Total Maintenance Cost $1,195,873.80 $1,288,329.96 $1,289,400.84 Total Revenues Collected $673,432.71 $691,972.92 $700,519.17 City's Subsidy* $522,441.10 $596,357.03 $588,881.67
Required City 50% Contribution
(General Benefit/Perimeter Areas)
$507,189.88 $516,274.29 $507,513.91
Total City Cost $1,029,630.98 $1,112,631.32 $1,096,395.58 *The City Subsidy Contribution funds streetlight, tree, landscape maintenance, water, and electricity costs within the Maintenance Districts. It should be noted that the costs are off by one cent due to rounding issues.
A Proposition 218 mail ballot election, with majority support, would be required for any rate increase to the property owners in the districts above their current maximum assessment.
Certain zones in Exhibit 1 had a 5% or less increase to their assessment for Fiscal Year 2025- 26 since they were not at their maximum assessment. This increase does not trigger a proposition election and will adjust each year until it reaches the maximum rate.
During Fiscal Year 2025-26, staff will continue to monitor expenditures and revenues by Districts and Zones to better track the subsidy.
ISSUES/ANALYSIS
Exhibit 1 enumerates the actual Fiscal Year 2024-25 assessments for the 75-1, 75-2, 76-1, 76-2 and 83-2 assessment districts and staff’s recommended assessments for Fiscal Year 2025-26, 935
CITY COUNCIL MEETING DATE: JULY 15, 2025
TITLE: LANDSCAPE AND STREETLIGHT MAINTENANCE DISTRICT ASSESSMENT FOR FISCAL YEAR 2025-26.
PAGE: 3
holding the per-zone assessments not-to-exceed their Fiscal Year 2024-25 amounts (except in those areas that the rate was below the maximum assessment).
Exhibit 2 enumerates the actual Fiscal Year 2024-25 assessments for the 2002-1 assessment district and staff’s recommended assessments for Fiscal Year 2025-26 which includes a 2.94% CPI rate increase.
The total maintenance cost for Fiscal Year 2025-26 is estimated to be $1,070.88 more than the previous fiscal year. However, the total revenue collected for Fiscal Year 2025-26 is estimated to be $8,546.25 more than the previous fiscal year. This is due to a rate increase for some districts that are not at their maximum assessment rate and District 2002-1 which has an escalator receiving a CPI increase. As a result, the City’s subsidy also increases to offset the total maintenance costs, and the total revenues collected.
It should be noted that the City contributes 50% of the perimeter cost for the common landscape and lighting areas. This cost is the City’s responsibility regardless of the revenue received.
A Public Hearing is required to levy the annual assessments. Pursuant to Section 22629 of the California Streets and Highways Code, all interested people shall be afforded the opportunity to hear and be heard, and upon the conclusion of the Public Hearing, the Council may order changes in any of the matters provided in the report.
Attachments: Resolution 2025-042
FY25-26 CPI
FY25-26 LMD 2002-1 ER
FY25-26 LMDs 75, 76, 83-2 ER
FY25-26 LMDs 75, 76, 83-2 Assessment Diagram
FY25-26 LMD 2002-1 Assessment Diagram
Exhibit 1 - Proposed Rates for LSMD's 75-1, 75-2, 76-1, 76-2, 83-2 Exhibit 2 - Proposed Rates for LSMD 2002-1
936
RESOLUTION NO. 2025-042
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHINO,
CALIFORNIA, LEVYING ASSESSMENTS FOR FISCAL YEAR 2025-26 FOR ASSESSMENT DISTRICTS 75-1, 75-2, 76-1, 76-2, 83-2, AND 2002-1, PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972
WHEREAS, pursuant to Chapter 3 of the Landscaping and Lighting Act of 1972 (“Act”), the City Council directed the City Engineer, the Engineer of Work for Assessment Districts 75-1, 75-2, 76-1, 76-2, 83-2, and 2002-1 (“Districts”), to prepare and file an annual report for Fiscal Year 2025- 26; and
WHEREAS, the Engineer of Work filed the annual report on June 17th, 2025, and the City Council adopted its resolution of intention to levy and collect assessments within the assessment districts for Fiscal Year 2025-26; and
WHEREAS, the City Council set a date for a public hearing, to be held on July 15, 2025, at 6:00 p.m., in the City Council Chambers, 13220 Central Avenue, Chino, California; and WHEREAS, at said public hearing, the City Council afforded to every interested person an opportunity to make a protest to the annual report, either in writing or orally, and the City Council considered each protest.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CHINO DOES HEREBY RESOLVE as follows:
Section 1. The above recitals are true and correct, and by this reference are incorporated herein.
Section 2. Pursuant to prior resolutions, the City Council initiated proceedings and declared its intention to levy assessments against the assessable lots and parcels of property within the District pursuant to the provisions of the Act for the Fiscal Year commencing July 1, 2025, and ending June 30, 2026, and ordered the Engineer to prepare the Engineer’s Report in accordance with the Act (the “Engineer’s Report”). The City Council, by prior resolution, approved such Engineer’s Report.
Section 3. Following notice duly given in accordance with the law, the City Council has held a full and fair public hearing regarding the Engineer’s Report and the levy and collection of the proposed assessments within the Districts for Fiscal Year 2025-26 to pay for the costs and expenses of the improvements described in the Engineer’s Report pursuant to the terms and provisions of the Act. All interested persons were afforded the opportunity to hear and be heard regarding protests and objections to the levy and collection of the proposed assessments against lots or parcels of property within the Districts. The City Council considered all oral and written statements, protests, and communications made or filed by interested persons.
Section 4. Based upon its review of the Engineer’s Report and other reports and information, the City Council hereby finds and determines that (i) the land within the Districts will be benefited by the improvements described in the Engineer’s Report, (ii) the Districts include all of the lands so benefited, and (iii) the net amount to be assessed upon the lands within the Districts for Fiscal Year 2025-26, in accordance with the Engineer’s Report, is apportioned by a formula and method which 937
RESOLUTION NO. 2025-042
PAGE 2
fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements. Any and all oral and written protests and objections are hereby overruled by the City Council.
Section 5. The City Council declares that the diagrams and assessments in the Engineer’s Report are hereby confirmed as filed.
Section 6. The City Council hereby orders the improvements described in the Engineer’s Report to be made.
Section 7. The assessment is in compliance with the provisions of the Act and the City Council has complied with all laws pertaining to the levy of annual assessments pursuant to the Act.
Section 8. The assessments are levied without regard to property valuation.
Section 9. Public property owned by any public agency and in use in the performance of a public function, which is included within the boundaries of the Districts, shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements.
Section 10. The assessments are levied for the purpose of paying the costs and expenses of the improvements described in the Engineer’s Report for Fiscal Year 2025-26.
Section 11. The improvements described in the Engineer’s Report shall be performed pursuant to law.
Section 12. The San Bernardino County Auditor-Controller shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the assessments shall be paid to the City Treasurer.
Section 13. The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund for the respective Districts.
Section 14. The adoption of this Resolution constitutes the levy of assessments against the lots and parcels of land in the District for the Fiscal Year commencing July 1, 2025, and ending June 30, 2026.
Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessments, or a certified copy of the diagram and assessments, with the San Bernardino County Auditor-Controller, together with a certified copy of this Resolution upon its adoption.
Section 16. A certified copy of the assessments and diagram shall be filed in the Public Works Department, with a duplicate copy on file in the City Clerk’s Office, and open for public inspection.
938
RESOLUTION NO. 2025-042
PAGE 3
APPROVED AND ADOPTED THIS 15
th DAY OF JULY 2025.
______________________________
EUNICE M. ULLOA, MAYOR
ATTEST:
____________________________
NATALIE GONZAGA, CITY CLERK
939
RESOLUTION NO. 2025-042
PAGE 4
State of California )
County of San Bernardino )§
City of Chino )
I, Natalie Gonzaga, City Clerk of the City of Chino, do hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting held on the 15 th day of July 2025, by the
following votes:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
____________________________
NATALIE GONZAGA, CITY CLERK
940
941
Engineer’s Report
Fiscal Year 2025-2026
City of Chino
Landscape and Street Light Maintenance
District No. 2002-1
Prepared For
June 2025
942
Table of Contents
Sections
Section i. Engineer’s Statement _________________________________________________i Section 1. Plans and Specifications ______________________________________________ 1 Section 2. Method of Assessment Apportionment__________________________________ 3 Section 3. Cost Estimate ______________________________________________________ 8 Section 4. Assessment Roll ___________________________________________________ 22 Tables
Table 2-1. Fiscal Year 2025-2026 Proposed Assessments _____________________________ 6 Table 3-1. Fiscal Year 2025-2026 Cost Estimate ____________________________________ 9 Appendices
Appendix A. Fiscal Year 2025-2026 Assessment Roll ________________________________ A-1 943
i. Engineer’s Statement
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 i
AGENCY: CITY OF CHINO
PROJECT: LANDSCAPE AND STREET LIGHT MAINTENANCE DISTRICT NO. 2002-1 TO: CITY COUNCIL
CITY OF CHINO
STATE OF CALIFORNIA
Report Pursuant to "Landscaping and Lighting Act of 1972" Pursuant to direction from the City Council (the “City Council”) of the City of Chino (the “City”), State of California, submitted herewith is the Engineer’s Report for Landscape and Street Light Maintenance District No. 2002-1 (the “Report”), consisting of the following parts, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, being the "Landscaping and Lighting Act of 1972" (the “Act”), as amended, commencing with Section 22500, Article XIII D, and which is in accordance with Resolution No. 2025-031 adopted by the City of Chino City Council, San Bernardino County, California ordering the preparation of the Report for Landscape and Street Light Maintenance District No. 2002-1 (the “District”). This Report is applicable for the ensuing 12-month period, being the Fiscal Year commencing July 1, 2025, to June 30, 2026.
SECTION 1 PLANS AND SPECIFICATIONS of the improvements to be maintained and/or improved for the Fiscal Year. The plans and specifications show and describe the existing improvements and are sufficient in showing and describing the general nature, location, and extent of the improvements.
SECTION 2 The METHOD OF ASSESSMENT APPORTIONMENT calculates the receipt of special benefit and the general benefit derived from the installation and maintenance and servicing of the respective improvements located throughout the District, and the methodology used to apportion the total assessment to the properties within the District.
SECTION 3 A COST ESTIMATE of the improvements to be maintained and/or improved for the mentioned Fiscal Year.
SECTION 4 An ASSESSMENT ROLL showing the proportionate amount of the assessment to be charged in proportion to the benefits to be received by each lot or parcel within the boundaries as shown on the Diagram.
944
i. Engineer’s Statement
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 ii
WHEREAS, on June 17, 2025, the City Council under the Act adopted its Resolution Initiating Proceedings for the Annual Levy of Assessments and Ordering the Preparation of an Engineer’s Report for the District; WHEREAS, the Resolution of Initiation directed Webb Municipal Finance, LLC to prepare and file a report presenting plans and specifications describing the general nature, location, and extent of improvements to be maintained, an estimate of the costs of the maintenance, operations and servicing of the improvements for the District for the referenced Fiscal Year, a diagram for the District showing the area and properties to be assessed, and an assessment of the estimated costs of the maintenance, operations and servicing of the improvements, assessing the net amount upon all assessable lots and-or parcels within the District in proportion to the special benefit received;
NOW THEREFORE, the assessments are made to cover the portion of the estimated costs of maintenance, operation, and servicing of said improvements to be paid by the assessable real property within the District in proportion to the special benefit received.
945
946
1. Plans and Specifications
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 1
Landscaping and Lighting Act of 1972: Improvements
The law allows the District, by direct benefit assessments, to provide funding for the installation, maintenance, operation, and administration of the following improvements:
• the installation, construction, repair, renovation, or replacement of public lighting facilities, including, but not limited to, traffic signals and streetlights;
• the installation or planting of landscaping in common landscape areas; • the trimming of trees in common landscape areas;
• the installation or construction of statuary, fountains or other ornamental structures and facilities; • the installation of park or recreational improvements; • the maintenance and/or servicing of the above;
• the acquisition of land for park, recreational or open space purposes; • the installation or construction of facilities appurtenant to the above or which are necessary or convenient for the maintenance and servicing; and
• Incidental expenses related to the District.
The Landscape and Lighting Act of 1972, Section 22573, provides that assessments be apportioned with reference to special benefit rather than according to assessed value. The section states:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to estimated benefits to be received by each such lot or parcel from the improvements. The determination of whether or not a lot or parcel will benefit from the improvements shall be made pursuant to the Improvement Act of 1911 (Division 7 {commencing with Section 5000}).” The Act also provides for the classification of various areas within an assessment district into different zones where:
“By reason of variations in the nature, location, and extent of the improvements, the various areas will receive differing degrees of benefit from the improvements; a zone shall consist of all territory which will receive substantially the same degree of benefit from the improvements.” As the assessments are levied on the basis of benefit, they are not a tax, and therefore are not governed by Article XIIIA of the Constitution of the State of California.
Properties owned by public agencies, such as the city, county, state, or federal government, are no longer exempt from assessment pursuant to the passage of Proposition 218. However, said public parcels will not be assessed during Fiscal Year 2025-2026 because the City of Chino invoked an exemption as noted in Article 4.6 Section 53753.5. (b)(2) of Chapter 4 Part 1 of Division 2 of Title 5 of the Government Code:
“Any assessment imposed pursuant to a petition signed by the persons owning all parcels subject to the assessment at the time the assessment is initially imposed.” When public property is not devoted to public use, it is assessed. Right-of-way owned by Southern California Edison Company and railroad operating right-of-way are also exempt from assessment.
Landscape and Street Lighting District 2002-1
The plans and specifications for the improvements within the District are on file and available for public inspection in the office of the City Engineer and are part of this report to the same extent as if said documents were attached hereto. The Assessor’s maps identifying the boundaries of the parcels located within each zone are on file in the office of the County Assessor and are by reference made a part of this report to the same extent as if they were 947
1. Plans and Specifications
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 2
attached. A detailed parcel list is included as Appendix C. The general nature and extent of improvements are as follows:
The District was established to provide for the installation, ongoing maintenance, operation, and servicing of landscaping and public street lighting improvements installed in connection with the development of parcels within the District.
Streetlights
The maintenance for streetlight improvements may include, but is not limited to, the repair, removal, and replacement of all or any part necessary to provide for the normal operation of streetlights. Routine repairs include replacing of the light bulb, lamp, glassware, fuse, or photocell. Extraordinary repair includes replacement of the ballast, luminaire, or correction of a wiring problem. Also included are the energy costs of the street light system.
Landscaping
The maintenance for landscape improvements includes, but is not limited to, the repair, removal or replacement of the landscaping; providing for the life, growth, health and beauty of the landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, and treating for disease or injury; the removal of trimmings, rubbish, debris, other solid waste; the maintenance, repair and replacement necessary for all irrigation systems; and the removal of graffiti from walls immediately adjacent to the cultivated areas. Also included are the energy costs of the irrigation system.
The engineering drawings for the improvements to be operated and maintained by the District are on file in the office of the City Engineer and are available for public inspection during normal business hours. 948
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 3
Proposition 218 Compliance
On November 5, 1996, California voters approved Proposition 218, entitled “Right to Vote on Taxes Act,” which added Article XIIID to the California Constitution. While its title refers only to taxes, Proposition 218 establishes new procedural requirements for the formation and administration of assessment districts. Proposition 218 also requires that with certain specified exception, which are described below, all existing assessment districts must be ratified by the property owners within the District using the new procedures.
Some of these exceptions include:
1) Any assessments imposed exclusively to finance the capital cost or maintenance and operation expenses for streets.
2) Any assessments levied pursuant to a petition signed by the persons owning all of the parcels subject to the assessment at the time the assessment was initially imposed However, even if assessments are initially exempt from Proposition 218, if the assessments are increased in the future, the City will need to comply with the provisions of Proposition 218 for that portion of the increased assessment formula (e.g., CPI increase).
Proposition 218 does not define the term “streets,” however, based on the opinions of the public agency officials, attorneys, assessment engineers, and Senate Bill 919, it has been determined that streets include all public improvements located within the street rights-of-way. This would include median and parkway landscaping, traffic signals, safety lighting, and street lighting.
Proposition 218 defines “assessment” as “any levy or charge upon real property by an agency for a special benefit conferred upon the real property,” California Constitution, Article XIII D, §2(b). A special assessment, sometimes called a “benefit assessment,” is a charge generally levied upon parcels of real property to pay for benefits the parcels receive from local improvements. Special assessments are levied according to statutory authority granted by the Legislature or, in some instances, local charters. Distinguishing among taxes, fees, and assessments can be difficult and often depends on the context in which the distinction is made. For example, taxes, assessments, and property-related fees all may be imposed on property. The key feature that distinguishes an assessment from a tax, fee, or charge is the existence of a special benefit to real property. Without identifying a special benefit, there can be no assessment.
Distinguishing General and Special Benefit
Proposition 218 added a set of procedures and requirements, which a local government must follow to levy an assessment. In addition to notice, hearing, and assessment ballot proceedings, Proposition 218 provides that “only special benefits are assessable” and requires a local government to “separate the general benefits from the special benefits conferred on a parcel.”
By its nature, most public improvements financed through an assessment district contain an element of public benefit. The test is: does there exist, with relation to the improvement, a special benefit to the property assessed? The law requires that portion of the cost of the improvement, which benefits the public generally to be separated from that portion of the cost of the improvement, which specially benefits assessed properties. Proposition 218 provides the following definition of “Special Benefit”:
“Special Benefit” means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large. General enhancement of property value does not constitute “special benefit”.
949
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 4
Method of Assessment Apportionment
The law, including Article XIIID of the Constitution of the State of California, requires and the statues, including the Proposition 218 Omnibus Implementation Act (Government Code Section 53750 and following), provide that special assessments, as levied pursuant to the “Landscaping and Lighting Act of 1972,” must be based solely on the special benefit properties receive from the improvements. The statutes do not specify the method or formula that should be used to apportion the assessment in any special assessment district proceedings. The City of Chino has retained the firm of Webb Municipal Finance, LLC for the purpose of assisting the City of Chino in making an analysis of the facts in Landscape and Street Light Maintenance District No. 2002-1 and recommending to the City of Chino the correct apportionment of the assessment obligation.
In performing the analysis, it was necessary to identify the benefits that the improvements being financed will render to the properties within the boundaries of this Assessment District and to determine the extent to which such properties receive a direct and special benefit as distinguished from that of the general public.
The method of apportionment of assessment is described below.
Street Lighting
The Street Lighting maintenance provided by the District applies to both Interior Street Lights and Perimeter Street Lights located within the District boundaries. The primary benefits of street lighting consist of safety for pedestrians, motorists and residents living and owning property in the District during the nighttime hours. Street lighting increases nighttime safety on the roads and streets by improving traffic circulation and reducing nighttime accidents, improved ingress and egress to property, improved access of emergency vehicles and reduction in vandalism and other criminal activities.
Interior Street Lights are defined as those located on streets that are not considered a Primary Arterial, Major Arterial, or Secondary Arterials as identified by the City’s General Plan. Based on their location and function, these lights provide a distinct and special benefit to all developed parcels within the District. Each and every parcel within the District receives a particular and distinct benefit from the operation and on-going maintenance of the Interior Street Lights over and above any general benefits that are provided and as such, the entire cost associated with these lights is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the District.
Perimeter Street Lights are defined as those lights located on streets that are classified as Primary Arterials, Major Arterials, or Secondary Arterials as identified by the City’s General Plan. Based on their location and function, the Perimeter Street Lights provide both special and general benefit to all developed parcels within the various Zones in the District. Due to the general benefit that is provided to the surrounding community from the operation and on-going maintenance of these lights, the City contributes 50 percent (50%) of the total annual cost related to the operation and maintenance for all perimeter lights with the various Zones in the District. The remaining 50 percent (50%) of the operation and maintenance cost is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the District.
Landscaping
The landscape maintenance provided to the various zones within the District applies to both Interior Landscaping and Perimeter Landscaping. The primary benefits that well-maintained landscaping provide are the beautification and enhancement of the desirability of the surroundings. These improvements provide special benefit to those developments that are directly adjacent to the landscape improvements as well as some general benefit. It also creates surroundings that are more pleasant for the motorists, residents, equestrians, and pedestrians within the District. Interior Landscaping is defined as areas within the District boundaries that are not considered a Primary Arterial, Major Arterial, or Secondary Arterials as identified by the City’s General Plan. Each and every parcel within 950
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 5
the District receives a particular and distinct benefit from the on-going maintenance of the Interior Landscaping over and above any general benefits that are provided and as such, the entire cost associated with these areas of landscaping is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the District.
Perimeter Landscaping is defined as areas within the District boundaries that are classified as Primary Arterials, Major Arterials, or Secondary Arterials as identified by the City’s General Plan. Based on their location and purpose, the Perimeter Landscaping provides both special and general benefit to all developed parcels within the various Zones in the District. Due to the general benefit that is provided to the surrounding community from the on-going maintenance of these landscaped areas, the City contributes 50 percent (50%) of the total annual cost related to any perimeter landscape maintenance with the various Zones in the District. The remaining 50 percent (50%) of the maintenance cost is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the District.
Annual Adjustments
Per direction of the District’s Engineer’s Report, commencing with Fiscal Year 2004-2005, the assessments may be increased annually for inflation, based on the Consumer Price Index – All Urban Consumers for the Los Angeles – Riverside-Orange County Area (CPI), as determined by the United States Department of Labor, Bureau of Labor Statistics, or its successor. Should the Bureau of Labor Statistics revise such index or discontinue the preparation of such index, this Department shall use a revised index or comparable system for determining fluctuations in the cost of living, as approved by the City Council. The Maximum Assessment is defined as the initial Assessment (approved by property owners within the District) adjusted annually by the CPI. If the proposed annual assessment for a given Fiscal Year is less than or equal to the calculated Maximum Assessment, then the proposed annual assessment is not considered an increased assessment.
In January 2018, the United States Department of Labor, Bureau of Labor Statistics, discontinued the Los Angeles - Riverside - Orange County Consumer Price Index and created a new Riverside - San Bernardino – Ontario Consumer Price Index. This new index is what was used to escalate the Maximum Assessment Rate, for each zone, by 2.94% for Fiscal Year 2025-2026.
Each of the parcels within the zones listed below has been deemed to receive proportional special benefit from the maintenance and operation of the improvements within that zone. The Fiscal Year 2025-2026 assessments per zone are as follows:
951
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 6
Table 2-1 – Fiscal Year 2025-2026 Proposed Assessments
Levy
Benefit Units
(BU)
Maximum
Assessment per
BU
Actual
Assessment per
BU
% of
Maximum Zone Costs
Zone 01 $7,633.38 82 $93.09 $93.09 100.00% $7,633.38
Zone 02 $3,825.12 6 $637.53 $637.52 100.00% $3,825.12
Zone 03 $14,636.16 121 $120.96 $120.96 100.00% $14,636.16 Zone 04 $4,919.10 19 $258.90 $258.90 100.00% $4,963.96
Zone 05 $239.25 15 $15.96 $15.95 99.95% $239.25
Zone 06 $2,498.12 19 $131.48 $131.48 100.00% $2,498.12
Zone 07 $750.31 19 $39.50 $39.49 99.98% $750.31
Zone 08 $3,186.60 4 $796.65 $796.65 100.00% $3,186.60
Zone 09 $19,876.14 23 $864.18 $864.18 100.00% $24,537.88 Zone 10 $1,011.78 11 $91.98 $91.98 100.00% $1,011.78
Zone 11 $2,193.50 2 $1,096.76 $1,096.75 100.00% $2,193.50 Zone 12 $72,739.94 238 $305.64 $305.63 100.00% $96,113.44 Zone 13 $710.43 17 $41.79 $41.79 100.00% $710.43
Zone 14 $331.32 6 $55.23 $55.22 99.98% $331.32
Zone 15 $1,068.72 8 $133.60 $133.59 99.99% $1,068.72
Zone 16 $1,482.47 11 $134.78 $134.77 99.99% $1,924.57
Zone 17 $12,438.90 18 $691.05 $691.05 100.00% $12,438.90 Zone 18 $13,955.48 308 $45.31 $45.31 99.99% $32,169.03
Zone 19 $2,971.29 1 $2,971.30 $2,971.29 100.00% $2,971.29 Zone 20 $505.96 14 $36.15 $36.14 99.97% $505.96
Zone 21 $370.78 2 $185.40 $185.39 100.00% $370.78
Zone 22 $931.05 15 $62.08 $62.07 99.99% $931.05
Zone 23 $442.70 19 $23.30 $23.30 100.00% $442.70
Zone 24 $984.34 14 $70.32 $70.31 99.99% $984.34
Zone 26 $57.58 1 $57.59 $57.58 99.99% $57.58
Zone 27 $3,837.92 17 $225.77 $225.76 100.00% $4,217.55
Zone 28 $944.19 9 $104.91 $104.91 100.00% $944.19
Zone 29 $2,197.80 22 $99.90 $99.90 100.00% $2,197.80
Zone 30 $709.24 4 $177.32 $177.31 99.99% $709.24
Zone 31 $632.40 10 $63.24 $63.24 100.00% $632.40
Zone 32 $2,225.47 17 $130.92 $130.91 99.99% $2,225.47
Zone 33 $635.44 1 $635.45 $635.44 100.00% $635.44
Zone 34 $1,762.68 1 $1,762.69 $1,762.68 100.00% $1,762.68 Zone 35 $1,563.72 3 $521.24 $521.24 100.00% $1,563.72
Zone 37 $1,806.31 11 $164.22 $164.21 100.00% $1,806.31
Zone 38 $560.30 10 $56.03 $56.03 99.99% $560.30
Zone 39 $2,251.65 3 $750.56 $750.55 100.00% $2,251.65
Zone 40 $1,353.22 11 $123.03 $123.02 99.99% $1,750.70
Zone 41 $827.42 1 $827.43 $827.42 100.00% $827.42
Zone 42 $1,022.28 42 $24.35 $24.34 99.98% $1,022.28
Zone 43 $1,178.24 7 $168.33 $168.32 99.99% $1,178.24
Zone 44 $1,127.47 31 $36.38 $36.37 99.98% $1,127.47
Zone 45 $3,087.68 16 $192.98 $192.98 100.00% $3,087.68
952
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 7
Levy
Benefit Units
(BU)
Maximum
Assessment per
BU
Actual
Assessment per
BU
% of
Maximum Zone Costs
Zone 48 $1,408.08 8 $176.02 $176.01 99.99% $1,408.08
Zone 49 $411.48 4 $102.88 $102.87 99.99% $411.48
Zone 50 $1,312.08 8 $164.01 $164.01 100.00% $1,312.08
Zone 51 $256.87 17 $15.11 $15.11 99.97% $256.87
Zone 52 $947.20 2 $473.61 $473.60 100.00% $947.20
Zone 53 $367.56 1 $367.57 $367.56 100.00% $367.56
Zone 54 $332.04 1 $332.05 $332.04 100.00% $332.04
Zone 55 $857.94 1 $857.95 $857.94 100.00% $857.94
Zone 56 $2,596.00 11 $236.01 $236.00 100.00% $2,596.00
Zone 58 $553.47 1 $553.47 $553.47 100.00% $553.47
Zone 59 $785.50 2 $392.76 $392.75 100.00% $785.50
Zone 60 $432.78 1 $432.78 $432.78 100.00% $432.78
Zone 61 $2,977.58 1 $2,977.58 $2,977.58 100.00% $2,977.58 Zone 62 $2,284.74 3 $761.59 $761.58 100.00% $2,284.74
Zone 63 $572.91 39 $14.69 $14.69 100.00% $572.91
Zone 65 $845.31 3 $281.78 $281.77 100.00% $845.31
Zone 66 $5,331.48 84 $63.47 $63.47 99.99% $5,331.48
Zone 67 $3,922.00 53 $74.01 $74.00 99.99% $3,922.00
Zone 68 $1,287.80 94 $13.71 $13.70 99.94% $1,287.80
Zone 69 $965.24 59 $16.36 $16.36 99.99% $965.24
Zone 71 $356.96 23 $15.52 $15.52 99.98% $356.96
Zone 72 $331.94 1 $331.947158 $331.94 100.00% $331.94
Zone 75 $1,962.45 147 $13.36 $13.35 99.93% $1,962.45
Zone 77 $1,949.56 122 $15.98 $15.98 99.98% $1,949.56
Zone 78 $632.83 1 $632.83 $632.83 100.00% $632.83
Zone 79 $355.33 1 $355.34 $355.33 100.00% $355.33
Zone 80 $2,086.80 94 $22.20 $22.20 99.99% $2,086.80
Zone 82 $782.68 1 $782.69 $782.68 100.00% $782.68
Zone 83 $854.31 1 $854.31 $854.31 100.00% $854.31
Zone 84 $214.47 1 $214.48 $214.47 100.00% $214.47
Zone 85 $319.54 2 $159.78 $159.77 100.00% $319.54
Future Annexations
It is anticipated that additional properties will be annexed to the District from time to time and will be assessed according to the adopted methodology and rates.
953
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 8
Annual costs for the Fiscal Year include maintenance, servicing and operation of public lighting and landscaping, and incidental expenses. Incidental expenses may include engineering, consulting, and legal costs for the administration of the District, finance department expenses for processing payments, and the cost of submittal of the annual assessments to the County of San Bernardino Auditor for placement on the tax roll.
The Fiscal Year 2025-2026 estimated costs of the improvements for the District were determined by the City and are summarized in Table 3-1.
954
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 9
Table 3-1 – Fiscal Year 2025-2026 Cost Estimates
Budget Item Zone 01 Zone 02 Zone 03 Zone 04 Zone 05 Zone 06
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $1,833.21 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $2,381.84 $0.00 $8,106.36 $3,693.16 $0.00 $932.43 Subtotal Landscape Maintenance $4,215.05 $0.00 $8,106.36 $3,693.16 $0.00 $932.43
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $1,680.14 $0.00 $1,136.69 $296.53 $0.00 $197.69 Perimeter Street Light Maintenance1 $220.18 $968.78 $329.28 $132.11 $106.26 $209.86 Subtotal Street Light Maintenance $1,900.32 $968.78 $1,465.97 $428.63 $106.26 $407.54
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $2,381.84 $0.00 $8,106.36 $3,693.16 $0.00 $932.43 Lighting General Benefit - City Contribution1 $220.18 $968.78 $329.28 $132.11 $106.26 $209.86 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $2,602.02 $968.78 $8,435.64 $3,825.27 $106.26 $1,142.29
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $268.51 $484.39 $3,108.01 $0.00 $53.13 $669.99 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $2,174.00 $0.00 $0.00 $58.14 $214.38 Subtotal Capital Improvement and Reserve Funding $268.51 $2,658.39 $3,108.01 $0.00 $111.27 $884.36
ADMINISTRATION
Total Annual District Administration $1,249.50 $197.94 $1,955.83 $842.17 $21.71 $273.78 Subtotal Administrative Cost $1,249.50 $197.94 $1,955.83 $842.17 $21.71 $273.78 Total Cost Amount $7,633.38 $3,825.12 $14,636.16 $4,963.96 $239.25 $2,498.12 Total Amount for Levy Submission $7,633.38 $3,825.12 $14,636.16 $4,919.10 $239.25 $2,498.12 Total City Subsidy $0.00 $0.00 $0.00 ($44.86) $0.00 $0.00
DISTRICT
Total Parcels 82 6 121 19 15 19
Total Benefit Units 82 6 121 19 15 19
Calculated Annual Assessment Rate per Benefit Unit $93.09 $637.52 $120.96 $258.90 $15.95 $131.48 Maximum Assessment Rate per Benefit Unit $93.09 $637.53 $120.96 $258.90 $15.96 $131.48 1 Amount Reflects 50% of Calculated Cost
955
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 10
Budget Item Zone 07 Zone 08 Zone 09 Zone 10 Zone 11 Zone 12
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $4,802.88 $0.00 $0.00 $54,177.77 Perimeter Landscape Maintenance1 $0.00 $1,439.32 $13,021.96 $0.00 $0.00 $18,245.43 Subtotal Landscape Maintenance $0.00 $1,439.32 $17,824.84 $0.00 $0.00 $72,423.20
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $197.69 $98.84 $790.74 $0.00 $0.00 $3,558.33 Perimeter Street Light Maintenance1 $153.14 $44.04 $132.11 $545.50 $557.17 $981.86 Subtotal Street Light Maintenance $350.82 $142.88 $922.85 $545.50 $557.17 $4,540.20
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $136.84 $1,627.19 $0.00 $0.00 $1,895.85 Perimeter Equestrian Trail Maintenance1 $0.00 $68.61 $0.00 $0.00 $0.00 $947.93 Subtotal Equestrian Trail Maintenance $0.00 $205.45 $1,627.19 $0.00 $0.00 $2,843.78
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $1,439.32 $13,021.96 $0.00 $0.00 $18,245.43 Lighting General Benefit - City Contribution1 $153.14 $44.04 $132.11 $545.50 $557.17 $981.86 Equestrian General Benefit - City Contribution1 $0.00 $68.61 $0.00 $0.00 $0.00 $947.93 Subtotal General Benefit Expenses - Contributions $153.14 $1,551.97 $13,154.07 $545.50 $557.17 $20,175.22
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $175.41 $893.83 $0.00 $272.75 $278.58 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $152.40 $139.87 $0.00 $82.06 $1,243.91 $0.00 Subtotal Capital Improvement and Reserve Funding $327.81 $1,033.69 $0.00 $354.82 $1,522.49 $0.00
ADMINISTRATION
Total Annual District Administration $71.68 $365.25 $4,163.01 $111.46 $113.84 $16,306.26 Subtotal Administrative Cost $71.68 $365.25 $4,163.01 $111.46 $113.84 $16,306.26 Total Cost Amount $750.31 $3,186.60 $24,537.88 $1,011.78 $2,193.50 $96,113.44 Total Amount for Levy Submission $750.31 $3,186.60 $19,876.14 $1,011.78 $2,193.50 $72,739.94 Total City Subsidy $0.00 $0.00 ($4,661.74) $0.00 $0.00 ($23,373.50)
DISTRICT
Total Parcels 19 4 23 11 2 238
Total Benefit Units 19 4 23 11 2 238
Calculated Annual Assessment Rate per Benefit Unit $39.49 $796.65 $864.18 $91.98 $1,096.75 $305.63 Maximum Assessment Rate per Benefit Unit $39.50 $796.65 $864.18 $91.98 $1,096.76 $305.64 1 Amount Reflects 50% of Calculated Cost
956
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 11
Budget Item Zone 13 Zone 14 Zone 15 Zone 16 Zone 17 Zone 18
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $1,115.75 $3,707.88 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $172.62 $235.20 $2,236.20 $24,802.08 Subtotal Landscape Maintenance $0.00 $0.00 $172.62 $1,350.95 $5,944.09 $24,802.08
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $148.26 $247.11 $235.35 $0.00 Perimeter Street Light Maintenance1 $194.34 $44.04 $88.07 $0.00 $176.14 $1,909.27 Subtotal Street Light Maintenance $194.34 $44.04 $236.34 $247.11 $411.50 $1,909.27
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $172.62 $235.20 $2,236.20 $24,802.08 Lighting General Benefit - City Contribution1 $194.34 $44.04 $88.07 $0.00 $176.14 $1,909.27 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $194.34 $44.04 $260.69 $235.20 $2,412.35 $26,711.35
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $97.17 $22.02 $204.48 $0.00 $3,177.79 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $379.22 $256.27 $371.73 $0.00 $1,606.95 $0.00 Subtotal Capital Improvement and Reserve Funding $476.39 $278.29 $576.21 $0.00 $4,784.74 $0.00
ADMINISTRATION
Total Annual District Administration $39.71 $9.00 $83.56 $326.52 $1,298.58 $5,457.68 Subtotal Administrative Cost $39.71 $9.00 $83.56 $326.52 $1,298.58 $5,457.68 Total Cost Amount $710.43 $331.32 $1,068.72 $1,924.57 $12,438.90 $32,169.03 Total Amount for Levy Submission $710.43 $331.32 $1,068.72 $1,482.47 $12,438.90 $13,955.48 Total City Subsidy $0.00 $0.00 $0.00 ($442.10) $0.00 ($18,213.55)
DISTRICT
Total Parcels 17 6 8 11 18 308
Total Benefit Units 17 6 8 11 18 308
Calculated Annual Assessment Rate per Benefit Unit $41.79 $55.22 $133.59 $134.77 $691.05 $45.31 Maximum Assessment Rate per Benefit Unit $41.79 $55.23 $133.60 $134.78 $691.05 $45.31 1 Amount Reflects 50% of Calculated Cost
957
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 12
Budget Item Zone 19 Zone 20 Zone 21 Zone 22 Zone 23 Zone 24
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $0.00 $162.38 $0.00 $345.95 Perimeter Street Light Maintenance1 $748.61 $106.26 $44.04 $106.26 $88.07 $88.07 Subtotal Street Light Maintenance $748.61 $106.26 $44.04 $268.65 $88.07 $434.02
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $748.61 $106.26 $44.04 $106.26 $88.07 $88.07 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $748.61 $106.26 $44.04 $106.26 $88.07 $88.07
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $374.30 $53.13 $22.02 $134.32 $44.04 $217.01 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $1,695.43 $324.85 $295.73 $473.19 $292.60 $244.63 Subtotal Capital Improvement and Reserve Funding $2,069.73 $377.98 $317.75 $607.51 $336.63 $461.64
ADMINISTRATION
Total Annual District Administration $152.96 $21.71 $9.00 $54.89 $17.99 $88.68 Subtotal Administrative Cost $152.96 $21.71 $9.00 $54.89 $17.99 $88.68 Total Cost Amount $2,971.29 $505.96 $370.78 $931.05 $442.70 $984.34 Total Amount for Levy Submission $2,971.29 $505.96 $370.78 $931.05 $442.70 $984.34 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 1 14 2 15 19 14
Total Benefit Units 1 14 2 15 19 14
Calculated Annual Assessment Rate per Benefit Unit $2,971.29 $36.14 $185.39 $62.07 $23.30 $70.31 Maximum Assessment Rate per Benefit Unit $2,971.30 $36.15 $185.40 $62.08 $23.30 $70.32 1 Amount Reflects 50% of Calculated Cost
958
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 13
Budget Item Zone 26 Zone 27 Zone 28 Zone 29 Zone 30 Zone 31
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $2,358.04 $0.00 $770.32 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $808.79 $0.00 $448.91 $275.85 $0.00 Subtotal Landscape Maintenance $0.00 $3,166.83 $0.00 $1,219.23 $275.85 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $247.11 $0.00 $345.95 $0.00 $0.00 Perimeter Street Light Maintenance1 $24.71 $88.07 $308.25 $44.04 $52.50 $163.65 Subtotal Street Light Maintenance $24.71 $335.18 $308.25 $389.98 $52.50 $163.65
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $808.79 $0.00 $448.91 $275.85 $0.00 Lighting General Benefit - City Contribution1 $24.71 $88.07 $308.25 $44.04 $52.50 $163.65 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $24.71 $896.86 $308.25 $492.95 $328.35 $163.65
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $12.36 $0.00 $154.12 $259.79 $164.18 $81.83 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $15.47 $0.00 $418.83 $0.00 $149.62 $353.49 Subtotal Capital Improvement and Reserve Funding $27.82 $0.00 $572.96 $259.79 $313.80 $435.31
ADMINISTRATION
Total Annual District Administration $5.05 $715.53 $62.98 $328.80 $67.09 $33.44 Subtotal Administrative Cost $5.05 $715.53 $62.98 $328.80 $67.09 $33.44 Total Cost Amount $57.58 $4,217.55 $944.19 $2,197.80 $709.24 $632.40 Total Amount for Levy Submission $57.58 $3,837.92 $944.19 $2,197.80 $709.24 $632.40 Total City Subsidy $0.00 ($379.63) $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 1 17 9 22 4 10
Total Benefit Units 1 17 9 22 4 10
Calculated Annual Assessment Rate per Benefit Unit $57.58 $225.76 $104.91 $99.90 $177.31 $63.24 Maximum Assessment Rate per Benefit Unit $57.59 $225.77 $104.91 $99.90 $177.32 $63.24 1 Amount Reflects 50% of Calculated Cost
959
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 14
Budget Item Zone 32 Zone 33 Zone 34 Zone 35 Zone 37 Zone 38
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $115.74 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $115.74 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $440.36 $0.00 $0.00 $103.73 $296.53 $162.38 Perimeter Street Light Maintenance1 $427.87 $88.07 $396.32 $25.93 $327.30 $0.00 Subtotal Street Light Maintenance $868.22 $88.07 $396.32 $129.66 $623.83 $162.38
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $115.74 $0.00 $0.00 Lighting General Benefit - City Contribution1 $427.87 $88.07 $396.32 $25.93 $327.30 $0.00 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $427.87 $88.07 $396.32 $141.67 $327.30 $0.00
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $434.11 $44.04 $198.16 $122.70 $311.92 $81.19 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $745.74 $485.34 $1,087.22 $1,145.48 $743.10 $283.55 Subtotal Capital Improvement and Reserve Funding $1,179.85 $529.37 $1,285.38 $1,268.18 $1,055.02 $364.74
ADMINISTRATION
Total Annual District Administration $177.40 $17.99 $80.98 $50.14 $127.46 $33.18 Subtotal Administrative Cost $177.40 $17.99 $80.98 $50.14 $127.46 $33.18 Total Cost Amount $2,225.47 $635.44 $1,762.68 $1,563.72 $1,806.31 $560.30 Total Amount for Levy Submission $2,225.47 $635.44 $1,762.68 $1,563.72 $1,806.31 $560.30 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 17 1 1 3 11 10
Total Benefit Units 17 1 1 3 11 10
Calculated Annual Assessment Rate per Benefit Unit $130.91 $635.44 $1,762.68 $521.24 $164.21 $56.03 Maximum Assessment Rate per Benefit Unit $130.92 $635.45 $1,762.69 $521.24 $164.22 $56.03 1 Amount Reflects 50% of Calculated Cost
960
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 15
Budget Item Zone 39 Zone 40 Zone 41 Zone 42 Zone 43 Zone 44
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $1,032.22 $0.00 $0.00 $484.63 $0.00 Subtotal Landscape Maintenance $0.00 $1,032.22 $0.00 $0.00 $484.63 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $88.07 $0.00 $98.84 $243.58 Perimeter Street Light Maintenance1 $484.39 $132.11 $132.11 $220.18 $44.04 $71.83 Subtotal Street Light Maintenance $484.39 $132.11 $220.18 $220.18 $142.88 $315.41
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $289.35 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $289.35 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $1,032.22 $0.00 $0.00 $484.63 $0.00 Lighting General Benefit - City Contribution1 $484.39 $132.11 $132.11 $220.18 $44.04 $71.83 Equestrian General Benefit - City Contribution1 $0.00 $289.35 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $484.39 $1,453.68 $132.11 $220.18 $528.67 $71.83
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $242.20 $0.00 $110.09 $110.09 $313.75 $157.70 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $1,426.09 $0.00 $452.17 $647.03 $108.76 $589.91 Subtotal Capital Improvement and Reserve Funding $1,668.29 $0.00 $562.25 $757.11 $422.52 $747.62
ADMINISTRATION
Total Annual District Administration $98.97 $297.02 $44.99 $44.99 $128.21 $64.44 Subtotal Administrative Cost $98.97 $297.02 $44.99 $44.99 $128.21 $64.44 Total Cost Amount $2,251.65 $1,750.70 $827.42 $1,022.28 $1,178.24 $1,127.47 Total Amount for Levy Submission $2,251.65 $1,353.22 $827.42 $1,022.28 $1,178.24 $1,127.47 Total City Subsidy $0.00 ($397.48) $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 3 11 1 42 7 31
Total Benefit Units 3 11 1 42 7 31
Calculated Annual Assessment Rate per Benefit Unit $750.55 $123.02 $827.42 $24.34 $168.32 $36.37 Maximum Assessment Rate per Benefit Unit $750.56 $123.03 $827.43 $24.35 $168.33 $36.38 1 Amount Reflects 50% of Calculated Cost
961
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 16
Budget Item Zone 45 Zone 48 Zone 49 Zone 50 Zone 51 Zone 52
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $604.22 $0.00 $1,013.72 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $604.22 $0.00 $1,013.72 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $704.57 $98.84 $81.19 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $318.79 $49.42 $0.00 $0.00 $165.82 $318.79 Subtotal Street Light Maintenance $1,023.36 $148.26 $81.19 $0.00 $165.82 $318.79
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $604.22 $0.00 $1,013.72 $0.00 $0.00 Lighting General Benefit - City Contribution1 $318.79 $49.42 $0.00 $0.00 $165.82 $318.79 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $318.79 $653.64 $0.00 $1,013.72 $165.82 $318.79
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $511.68 $376.24 $40.60 $91.24 $57.16 $159.40 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $1,343.54 $125.61 $273.10 $0.00 $0.00 $403.87 Subtotal Capital Improvement and Reserve Funding $1,855.22 $501.85 $313.70 $91.24 $57.16 $563.27
ADMINISTRATION
Total Annual District Administration $209.09 $153.75 $16.59 $207.12 $33.88 $65.14 Subtotal Administrative Cost $209.09 $153.75 $16.59 $207.12 $33.88 $65.14 Total Cost Amount $3,087.68 $1,408.08 $411.48 $1,312.08 $256.87 $947.20 Total Amount for Levy Submission $3,087.68 $1,408.08 $411.48 $1,312.08 $256.87 $947.20 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 16 8 4 8 17 2
Total Benefit Units 16 8 4 8 17 2
Calculated Annual Assessment Rate per Benefit Unit $192.98 $176.01 $102.87 $164.01 $15.11 $473.60 Maximum Assessment Rate per Benefit Unit $192.98 $176.02 $102.88 $164.01 $15.11 $473.61 1 Amount Reflects 50% of Calculated Cost
962
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 17
Budget Item Zone 53 Zone 54 Zone 55 Zone 56 Zone 58 Zone 59
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $44.04 $44.04 $264.21 $647.52 $91.10 $220.18 Subtotal Street Light Maintenance $44.04 $44.04 $264.21 $647.52 $91.10 $220.18
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $44.04 $44.04 $264.21 $647.52 $91.10 $220.18 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $44.04 $44.04 $264.21 $647.52 $91.10 $220.18
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $22.02 $22.02 $132.11 $323.76 $45.55 $110.09 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $292.51 $256.99 $407.63 $1,492.43 $398.20 $410.25 Subtotal Capital Improvement and Reserve Funding $314.53 $279.01 $539.74 $1,816.18 $443.76 $520.33
ADMINISTRATION
Total Annual District Administration $9.00 $9.00 $53.98 $132.30 $18.61 $44.99 Subtotal Administrative Cost $9.00 $9.00 $53.98 $132.30 $18.61 $44.99 Total Cost Amount $367.56 $332.04 $857.94 $2,596.00 $553.47 $785.50 Total Amount for Levy Submission $367.56 $332.04 $857.94 $2,596.00 $553.47 $785.50 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 1 1 1 11 1 2
Total Benefit Units 1 1 1 11 1 2
Calculated Annual Assessment Rate per Benefit Unit $367.56 $332.04 $857.94 $236.00 $553.47 $392.75 Maximum Assessment Rate per Benefit Unit $367.57 $332.05 $857.95 $236.01 $553.470037 $392.76 1 Amount Reflects 50% of Calculated Cost
963
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 18
Budget Item Zone 60 Zone 61 Zone 62 Zone 63 Zone 65 Zone 66
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $2,209.48 Perimeter Street Light Maintenance1 $88.07 $1,056.86 $792.64 $132.11 $238.37 $163.65 Subtotal Street Light Maintenance $88.07 $1,056.86 $792.64 $132.11 $238.37 $2,373.13
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $88.07 $1,056.86 $792.64 $132.11 $238.37 $163.65 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $88.07 $1,056.86 $792.64 $132.11 $238.37 $163.65
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $44.04 $528.43 $396.32 $66.05 $119.19 $1,186.56 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $282.68 $1,176.36 $933.82 $347.76 $439.05 $1,286.91 Subtotal Capital Improvement and Reserve Funding $326.71 $1,704.79 $1,330.15 $413.81 $558.23 $2,473.47
ADMINISTRATION
Total Annual District Administration $17.99 $215.94 $161.95 $26.99 $48.70 $484.88 Subtotal Administrative Cost $17.99 $215.94 $161.95 $26.99 $48.70 $484.88 Total Cost Amount $432.78 $2,977.58 $2,284.74 $572.91 $845.31 $5,331.48 Total Amount for Levy Submission $432.78 $2,977.58 $2,284.74 $572.91 $845.31 $5,331.48 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 1 1 3 39 3 84
Total Benefit Units 1 1 3 39 3 84
Calculated Annual Assessment Rate per Benefit Unit $432.78 $2,977.58 $761.58 $14.69 $281.77 $63.47 Maximum Assessment Rate per Benefit Unit $432.78 $2,977.58 $761.59 $14.69 $281.78 $63.47 1 Amount Reflects 50% of Calculated Cost
964
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 19
Budget Item Zone 67 Zone 68 Zone 69 Zone 71 Zone 72 Zone 75
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $1,399.33 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $220.18 $204.45 $264.21 $63.50 $52.78 $369.58 Subtotal Street Light Maintenance $1,619.51 $204.45 $264.21 $63.50 $52.78 $369.58
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $220.18 $204.45 $264.21 $63.50 $52.78 $369.58 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $220.18 $204.45 $264.21 $63.50 $52.78 $369.58
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $809.76 $102.22 $132.11 $31.75 $26.39 $184.79 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $1,161.83 $939.35 $514.93 $248.74 $241.99 $1,332.57 Subtotal Capital Improvement and Reserve Funding $1,971.59 $1,041.58 $647.04 $280.49 $268.38 $1,517.36
ADMINISTRATION
Total Annual District Administration $330.90 $41.77 $53.98 $12.97 $10.78 $75.51 Subtotal Administrative Cost $330.90 $41.77 $53.98 $12.97 $10.78 $75.51 Total Cost Amount $3,922.00 $1,287.80 $965.24 $356.96 $331.94 $1,962.45 Total Amount for Levy Submission $3,922.00 $1,287.80 $965.24 $356.96 $331.94 $1,962.45 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 53 94 59 23 1 147
Total Benefit Units 53 94 59 23 1 147
Calculated Annual Assessment Rate per Benefit Unit $74.00 $13.70 $16.36 $15.52 $331.94 $13.35 Maximum Assessment Rate per Benefit Unit $74.01 $13.71 $16.36 $15.52 $331.95 $13.36 1 Amount Reflects 50% of Calculated Cost
965
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 20
Budget Item Zone 77 Zone 78 Zone 79 Zone 80 Zone 82 Zone 83
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $0.00 $91.62 $0.00 $0.00 Perimeter Street Light Maintenance1 $372.55 $108.20 $57.70 $190.40 $108.20 $162.30 Subtotal Street Light Maintenance $372.55 $108.20 $57.70 $282.01 $108.20 $162.30
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $372.55 $108.20 $57.70 $190.40 $108.20 $162.30 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $372.55 $108.20 $57.70 $190.40 $108.20 $162.30
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $186.27 $54.10 $28.85 $141.01 $54.10 $81.15 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $1,314.62 $448.43 $256.98 $1,606.16 $598.28 $577.70 Subtotal Capital Improvement and Reserve Funding $1,500.89 $502.53 $285.84 $1,747.16 $652.38 $658.85
ADMINISTRATION
Total Annual District Administration $76.12 $22.11 $11.79 $57.62 $22.11 $33.16 Subtotal Administrative Cost $76.12 $22.11 $11.79 $57.62 $22.11 $33.16 Total Cost Amount $1,949.56 $632.83 $355.33 $2,086.80 $782.68 $854.31 Total Amount for Levy Submission $1,949.56 $632.83 $355.33 $2,086.80 $782.68 $854.31 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 122 1 1 94 3 1
Total Benefit Units 122 1 1 94 1 1
Calculated Annual Assessment Rate per Benefit Unit $15.98 $632.83 $355.33 $22.20 $782.68 $854.31 Maximum Assessment Rate per Benefit Unit $15.98 $632.83 $355.34 $22.20 $782.69 $854.31 1 Amount Reflects 50% of Calculated Cost
966
3. Cost Estimate
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 21
Budget Item Zone 84 Zone 85
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00
Perimeter Landscape Maintenance1 $0.00 $0.00
Subtotal Landscape Maintenance $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00
Perimeter Street Light Maintenance1 $5.84 $32.56
Subtotal Street Light Maintenance $5.84 $32.56
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00
Perimeter Equestrian Trail Maintenance1 $0.00 $0.00
Subtotal Equestrian Trail Maintenance $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00
Lighting Improvements CIP Expenditures $0.00 $0.00
Subtotal Capital Improvement Expenditures $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 Lighting General Benefit - City Contribution1 $5.84 $32.56 Equestrian General Benefit - City Contribution1 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $5.84 $32.56
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $2.92 $16.28
Operational Reserve Contribution $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $204.51 $264.05 Subtotal Capital Improvement and Reserve Funding $207.43 $280.33
ADMINISTRATION
Total Annual District Administration $1.19 $6.65
Subtotal Administrative Cost $1.19 $6.65
Total Cost Amount $214.47 $319.54
Total Amount for Levy Submission $214.47 $319.54
Total City Subsidy $0.00 $0.00
DISTRICT
Total Parcels 1 2
Total Benefit Units 1 2
Calculated Annual Assessment Rate per Benefit Unit $214.47 $159.77 Maximum Assessment Rate per Benefit Unit $214.48 $159.78 1 Amount Reflects 50% of Calculated Cost
967
4. Assessment Roll
City of Chino Landscape and Street Lighting District 2002-1 Engineer’s Report for Fiscal Year 2025-2026 22
The boundaries of Landscape and Street Light Maintenance District No. 2002-1 coincide with the boundaries of the parcels included within the District as of the time of the adoption of the Resolution of Intention and the Initiation of these proceedings.
Reference is made to the County Assessor's Roll and Maps for a detailed description of the lines and dimensions of any lot or parcel. The lines and dimensions of each lot shall conform to those shown on the County Assessor's Maps for the Fiscal Year to which the "Report" applies.
Please refer to Appendix A for the Fiscal Year 2025-2026 Assessment Roll. 968
APPENDIX A
Fiscal Year 2025-2026 Assessment Roll
969
APN Levy Amount APN Levy Amount
CC08SP10 - LMD 2002-1 01
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016122010000 $93.09
1016122020000 $93.09
1016122030000 $93.09
1016122040000 $93.09
1016122050000 $93.09
1016122060000 $93.09
1016122070000 $93.09
1016122080000 $93.09
1016122090000 $93.09
1016122100000 $93.09
1016122110000 $93.09
1016122120000 $93.09
1016122130000 $93.09
1016122140000 $93.09
1016122150000 $93.09
1016122160000 $93.09
1016122170000 $93.09
1016122180000 $93.09
1016122190000 $93.09
1016122200000 $93.09
1016131050000 $93.09
1016131060000 $93.09
1016131070000 $93.09
1016131080000 $93.09
1016131090000 $93.09
1016131100000 $93.09
1016131110000 $93.09
1016131120000 $93.09
1016131130000 $93.09
1016131140000 $93.09
1016131150000 $93.09
1016131160000 $93.09
1016131170000 $93.09
1016131180000 $93.09
1016131190000 $93.09
1016131200000 $93.09
1016131210000 $93.09
1016131220000 $93.09
1016131230000 $93.09
1016131240000 $93.09
1016131250000 $93.09
1016131260000 $93.09
1016131270000 $93.09
1016131280000 $93.09
1016131290000 $93.09
1016131300000 $93.09
1016131310000 $93.09
1016131320000 $93.09
1016131330000 $93.09
1016131340000 $93.09
1016131350000 $93.09
1016131360000 $93.09
1016131370000 $93.09
1016131380000 $93.09
1016131390000 $93.09
1016131400000 $93.09
1016131410000 $93.09
1016131420000 $93.09
1016131430000 $93.09
1016131440000 $93.09
1016131450000 $93.09
1016131460000 $93.09
1016131470000 $93.09
1016131480000 $93.09
1016131490000 $93.09
1016131500000 $93.09
1016131510000 $93.09
1016131520000 $93.09
1016131530000 $93.09
1016131540000 $93.09
1016131550000 $93.09
1016131560000 $93.09
1016131570000 $93.09
1016131580000 $93.09
1016131590000 $93.09
1016131600000 $93.09
1016131610000 $93.09
1016131620000 $93.09
1016131630000 $93.09
1016131640000 $93.09
1016131650000 $93.09
1016131660000 $93.09
82 $7,633.38
City of Chino - LMD 2002-1 Page 1 of 80970
APN Levy Amount APN Levy Amount
CC08SP11 - LMD 2002-1 02
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056041030000 $637.52
1056041040000 $637.52
1056161040000 $637.52
1056171080000 $637.52
1056171090000 $637.52
1056191020000 $637.52
6 $3,825.12
City of Chino - LMD 2002-1 Page 2 of 80971
APN Levy Amount APN Levy Amount
CC08SP12 - LMD 2002-1 03
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020121260000 $120.96
1020121270000 $120.96
1020121280000 $120.96
1020121290000 $120.96
1020121300000 $120.96
1020121310000 $120.96
1020121320000 $120.96
1020121330000 $120.96
1020121340000 $120.96
1020121350000 $120.96
1020121360000 $120.96
1020121370000 $120.96
1020121380000 $120.96
1020121390000 $120.96
1020121400000 $120.96
1020121410000 $120.96
1020121420000 $120.96
1020121430000 $120.96
1020121440000 $120.96
1020121450000 $120.96
1020121460000 $120.96
1020121470000 $120.96
1020131030000 $120.96
1020131040000 $120.96
1020131050000 $120.96
1020131060000 $120.96
1020131070000 $120.96
1020131080000 $120.96
1020131090000 $120.96
1020131100000 $120.96
1020131110000 $120.96
1020131120000 $120.96
1020131130000 $120.96
1020131140000 $120.96
1020131150000 $120.96
1020131160000 $120.96
1020131170000 $120.96
1020131180000 $120.96
1020131190000 $120.96
1020131200000 $120.96
1020131210000 $120.96
1020131220000 $120.96
1020131230000 $120.96
1020131240000 $120.96
1020131250000 $120.96
1020131260000 $120.96
1020131270000 $120.96
1020131280000 $120.96
1020131290000 $120.96
1020131300000 $120.96
1020131310000 $120.96
1020131320000 $120.96
1020131330000 $120.96
1020131340000 $120.96
1020131350000 $120.96
1020131360000 $120.96
1020131370000 $120.96
1020131380000 $120.96
1020132010000 $120.96
1020132020000 $120.96
1020132030000 $120.96
1020132040000 $120.96
1020132050000 $120.96
1020132060000 $120.96
1020132070000 $120.96
1020132080000 $120.96
1020132090000 $120.96
1020132100000 $120.96
1020132110000 $120.96
1020132120000 $120.96
1020132130000 $120.96
1020132140000 $120.96
1020132150000 $120.96
1020132160000 $120.96
1020132170000 $120.96
1020132180000 $120.96
1020132190000 $120.96
1020132200000 $120.96
1020132210000 $120.96
1020132220000 $120.96
1020132230000 $120.96
1020132240000 $120.96
1020132250000 $120.96
1020132260000 $120.96
1020132270000 $120.96
1020132280000 $120.96
1020132290000 $120.96
1020132300000 $120.96
1020132310000 $120.96
1020132320000 $120.96
1020132330000 $120.96
1020132340000 $120.96
1020132350000 $120.96
1020132360000 $120.96
1020132370000 $120.96
1020132380000 $120.96
City of Chino - LMD 2002-1 Page 3 of 80972
APN Levy Amount APN Levy Amount
CC08SP12 - LMD 2002-1 03
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020132390000 $120.96
1020132400000 $120.96
1020132410000 $120.96
1020132420000 $120.96
1020132430000 $120.96
1020132440000 $120.96
1020132450000 $120.96
1020132460000 $120.96
1020132470000 $120.96
1020132480000 $120.96
1020132490000 $120.96
1020132500000 $120.96
1020132510000 $120.96
1020132520000 $120.96
1020132530000 $120.96
1020132540000 $120.96
1020132550000 $120.96
1020132560000 $120.96
1020132570000 $120.96
1020132580000 $120.96
1020132590000 $120.96
1020132600000 $120.96
1020132610000 $120.96
1020132620000 $120.96
1020132630000 $120.96
121 $14,636.16
City of Chino - LMD 2002-1 Page 4 of 80973
APN Levy Amount APN Levy Amount
CC08SP13 - LMD 2002-1 04
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020201380000 $258.90
1020201390000 $258.90
1020201400000 $258.90
1020201410000 $258.90
1020201420000 $258.90
1020201430000 $258.90
1020201440000 $258.90
1020201450000 $258.90
1020201460000 $258.90
1020201470000 $258.90
1020201480000 $258.90
1020201490000 $258.90
1020201500000 $258.90
1020201510000 $258.90
1020201520000 $258.90
1020201530000 $258.90
1020201540000 $258.90
1020201550000 $258.90
1020201560000 $258.90
19 $4,919.10
City of Chino - LMD 2002-1 Page 5 of 80974
APN Levy Amount APN Levy Amount
CC08SP14 - LMD 2002-1 05
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021491050000 $15.95
1021491060000 $15.95
1021491070000 $15.95
1021491080000 $15.95
1021491100000 $15.95
1021491110000 $15.95
1021491160000 $15.95
1021491170000 $15.95
1021491180000 $15.95
1021491220000 $15.95
1021491230000 $15.95
1021491250000 $15.95
1021491270000 $15.95
1021491280000 $15.95
1021491290000 $15.95
15 $239.25
City of Chino - LMD 2002-1 Page 6 of 80975
APN Levy Amount APN Levy Amount
CC08SP15 - LMD 2002-1 06
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052031670000 $131.48
1052031680000 $131.48
1052031690000 $131.48
1052031700000 $131.48
1052031710000 $131.48
1052031720000 $131.48
1052031730000 $131.48
1052031740000 $131.48
1052031750000 $131.48
1052031760000 $131.48
1052031770000 $131.48
1052031780000 $131.48
1052031790000 $131.48
1052031800000 $131.48
1052031810000 $131.48
1052031820000 $131.48
1052031830000 $131.48
1052031840000 $131.48
1052031850000 $131.48
19 $2,498.12
City of Chino - LMD 2002-1 Page 7 of 80976
APN Levy Amount APN Levy Amount
CC08SP16 - LMD 2002-1 07
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1013412120000 $39.49
1013412130000 $39.49
1013412140000 $39.49
1013412150000 $39.49
1013412160000 $39.49
1013412170000 $39.49
1013412180000 $39.49
1013412190000 $39.49
1013412200000 $39.49
1013412210000 $39.49
1013412220000 $39.49
1013412230000 $39.49
1013412240000 $39.49
1013412250000 $39.49
1013412260000 $39.49
1013412270000 $39.49
1013412280000 $39.49
1013412290000 $39.49
1013412300000 $39.49
19 $750.31
City of Chino - LMD 2002-1 Page 8 of 80977
APN Levy Amount APN Levy Amount
CC08SP17 - LMD 2002-1 08
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053491410000 $796.65
1053491420000 $796.65
1053491430000 $796.65
1053491440000 $796.65
4 $3,186.60
City of Chino - LMD 2002-1 Page 9 of 80978
APN Levy Amount APN Levy Amount
CC08SP18 - LMD 2002-1 09
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053491180000 $864.18
1053491190000 $864.18
1053491200000 $864.18
1053491210000 $864.18
1053491220000 $864.18
1053491230000 $864.18
1053491240000 $864.18
1053491250000 $864.18
1053491260000 $864.18
1053491270000 $864.18
1053491280000 $864.18
1053491290000 $864.18
1053491300000 $864.18
1053491310000 $864.18
1053491320000 $864.18
1053491330000 $864.18
1053491340000 $864.18
1053491350000 $864.18
1053491360000 $864.18
1053491370000 $864.18
1053491380000 $864.18
1053491390000 $864.18
1053491400000 $864.18
23 $19,876.14
City of Chino - LMD 2002-1 Page 10 of 80979
APN Levy Amount APN Levy Amount
CC08SP19 - LMD 2002-1 10
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021101400000 $91.98
1021101410000 $91.98
1021101420000 $91.98
1021101430000 $91.98
1021101440000 $91.98
1021231180000 $91.98
1021231190000 $91.98
1021231200000 $91.98
1021231210000 $91.98
1021231220000 $91.98
1021261050000 $91.98
11 $1,011.78
City of Chino - LMD 2002-1 Page 11 of 80980
APN Levy Amount APN Levy Amount
CC08SP20 - LMD 2002-1 11
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056051030000 $1,096.75
1056061070000 $1,096.75
2 $2,193.50
City of Chino - LMD 2002-1 Page 12 of 80981
APN Levy Amount APN Levy Amount
CC08SP21 - LMD 2002-1 12
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052331520000 $305.63
1052331530000 $305.63
1052331540000 $305.63
1052331550000 $305.63
1052331560000 $305.63
1052331570000 $305.63
1052331580000 $305.63
1052331590000 $305.63
1052331600000 $305.63
1052331610000 $305.63
1052331620000 $305.63
1052331630000 $305.63
1052331640000 $305.63
1052331650000 $305.63
1052331660000 $305.63
1052331670000 $305.63
1052331680000 $305.63
1052331690000 $305.63
1052331700000 $305.63
1052331710000 $305.63
1052331720000 $305.63
1052331730000 $305.63
1052331740000 $305.63
1052332010000 $305.63
1052332020000 $305.63
1052332030000 $305.63
1052332040000 $305.63
1052332050000 $305.63
1052332060000 $305.63
1052332070000 $305.63
1052332080000 $305.63
1052332090000 $305.63
1052332100000 $305.63
1052332110000 $305.63
1052332120000 $305.63
1052332130000 $305.63
1052332140000 $305.63
1052332150000 $305.63
1052332160000 $305.63
1052332170000 $305.63
1052332180000 $305.63
1052332190000 $305.63
1052332200000 $305.63
1052332210000 $305.63
1052332220000 $305.63
1052332230000 $305.63
1052332240000 $305.63
1052332250000 $305.63
1052332260000 $305.63
1052332270000 $305.63
1052332280000 $305.63
1052332290000 $305.63
1052332300000 $305.63
1052332310000 $305.63
1052332320000 $305.63
1052332330000 $305.63
1052332340000 $305.63
1052332350000 $305.63
1052332360000 $305.63
1052332370000 $305.63
1052332380000 $305.63
1052332390000 $305.63
1052332400000 $305.63
1052332410000 $305.63
1052332420000 $305.63
1052332430000 $305.63
1052332440000 $305.63
1052332450000 $305.63
1052332460000 $305.63
1052332470000 $305.63
1052341210000 $305.63
1052341220000 $305.63
1052341230000 $305.63
1052341240000 $305.63
1052341250000 $305.63
1052341260000 $305.63
1052341270000 $305.63
1052341280000 $305.63
1052341290000 $305.63
1052341300000 $305.63
1052341310000 $305.63
1052341320000 $305.63
1052341330000 $305.63
1052341340000 $305.63
1052341350000 $305.63
1052341360000 $305.63
1052341370000 $305.63
1052341380000 $305.63
1052341390000 $305.63
1052341400000 $305.63
1052341410000 $305.63
1052341420000 $305.63
1052341430000 $305.63
1052341440000 $305.63
1052341450000 $305.63
1052341460000 $305.63
City of Chino - LMD 2002-1 Page 13 of 80982
APN Levy Amount APN Levy Amount
CC08SP21 - LMD 2002-1 12
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052341470000 $305.63
1052341480000 $305.63
1052341490000 $305.63
1052341500000 $305.63
1052341510000 $305.63
1052341520000 $305.63
1052341530000 $305.63
1052341540000 $305.63
1052341550000 $305.63
1052341560000 $305.63
1052341570000 $305.63
1052341580000 $305.63
1052341590000 $305.63
1052341600000 $305.63
1052341610000 $305.63
1052341620000 $305.63
1052341630000 $305.63
1052341640000 $305.63
1052341650000 $305.63
1052341660000 $305.63
1052341670000 $305.63
1052341680000 $305.63
1052341690000 $305.63
1052341700000 $305.63
1052341710000 $305.63
1052341720000 $305.63
1052341730000 $305.63
1052341740000 $305.63
1052341750000 $305.63
1052341760000 $305.63
1052341770000 $305.63
1052341780000 $305.63
1052341790000 $305.63
1052341800000 $305.63
1052341810000 $305.63
1052341820000 $305.63
1052341830000 $305.63
1052341840000 $305.63
1052341850000 $305.63
1052341860000 $305.63
1052341870000 $305.63
1052342010000 $305.63
1052342020000 $305.63
1052342030000 $305.63
1052342040000 $305.63
1052342050000 $305.63
1052342060000 $305.63
1052342070000 $305.63
1052342080000 $305.63
1052342090000 $305.63
1052342100000 $305.63
1052342110000 $305.63
1052342120000 $305.63
1052342130000 $305.63
1052342140000 $305.63
1052342150000 $305.63
1052631150000 $305.63
1052631160000 $305.63
1052631170000 $305.63
1052631180000 $305.63
1052631190000 $305.63
1052631200000 $305.63
1052631210000 $305.63
1052631220000 $305.63
1052631230000 $305.63
1052631240000 $305.63
1052631250000 $305.63
1052631260000 $305.63
1052631270000 $305.63
1052631280000 $305.63
1052631290000 $305.63
1052631300000 $305.63
1052631310000 $305.63
1052631320000 $305.63
1052631330000 $305.63
1052631340000 $305.63
1052631350000 $305.63
1052631360000 $305.63
1052631370000 $305.63
1052631380000 $305.63
1052631390000 $305.63
1052631400000 $305.63
1052631410000 $305.63
1052631420000 $305.63
1052631430000 $305.63
1052631440000 $305.63
1052631450000 $305.63
1052631460000 $305.63
1052631470000 $305.63
1052631480000 $305.63
1052631490000 $305.63
1052631500000 $305.63
1052631510000 $305.63
1052631520000 $305.63
1052631530000 $305.63
1052631540000 $305.63
City of Chino - LMD 2002-1 Page 14 of 80983
APN Levy Amount APN Levy Amount
CC08SP21 - LMD 2002-1 12
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052631550000 $305.63
1052631560000 $305.63
1052631570000 $305.63
1052631580000 $305.63
1052631590000 $305.63
1052631600000 $305.63
1052631610000 $305.63
1052631620000 $305.63
1052631630000 $305.63
1052631640000 $305.63
1052631650000 $305.63
1052631660000 $305.63
1052631670000 $305.63
1052631680000 $305.63
1052631690000 $305.63
1052631700000 $305.63
1052631710000 $305.63
1052631720000 $305.63
1052631730000 $305.63
1052631740000 $305.63
1052631750000 $305.63
1052631760000 $305.63
1052631770000 $305.63
1052631780000 $305.63
1052631790000 $305.63
1052631800000 $305.63
1052631810000 $305.63
1052631820000 $305.63
1052631830000 $305.63
1052631840000 $305.63
1052631850000 $305.63
1052631860000 $305.63
1052631870000 $305.63
1052631880000 $305.63
1052631890000 $305.63
1052631900000 $305.63
1052632010000 $305.63
1052632020000 $305.63
1052632030000 $305.63
1052632040000 $305.63
1052632050000 $305.63
1052632060000 $305.63
1052632070000 $305.63
1052632080000 $305.63
1052632090000 $305.63
1052632100000 $305.63
238 $72,739.94
City of Chino - LMD 2002-1 Page 15 of 80984
APN Levy Amount APN Levy Amount
CC08SP22 - LMD 2002-1 13
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021461090000 $41.79
1021461100000 $41.79
1021461110000 $41.79
1021461120000 $41.79
1021461130000 $41.79
1021461140000 $41.79
1021461150000 $41.79
1021461160000 $41.79
1021461170000 $41.79
1021461180000 $41.79
1021461190000 $41.79
1021461200000 $41.79
1021461210000 $41.79
1021461220000 $41.79
1021461230000 $41.79
1021461240000 $41.79
1021461250000 $41.79
17 $710.43
City of Chino - LMD 2002-1 Page 16 of 80985
APN Levy Amount APN Levy Amount
CC08SP23 - LMD 2002-1 14
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020481640000 $55.22
1020481650000 $55.22
1020481660000 $55.22
1020481670000 $55.22
1020481680000 $55.22
1020481690000 $55.22
6 $331.32
City of Chino - LMD 2002-1 Page 17 of 80986
APN Levy Amount APN Levy Amount
CC08SP24 - LMD 2002-1 15
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052021570000 $133.59
1052021580000 $133.59
1052021590000 $133.59
1052021600000 $133.59
1052021610000 $133.59
1052021620000 $133.59
1052021630000 $133.59
1052021640000 $133.59
8 $1,068.72
City of Chino - LMD 2002-1 Page 18 of 80987
APN Levy Amount APN Levy Amount
CC08SP25 - LMD 2002-1 16
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052021690000 $134.77
1052021700000 $134.77
1052021710000 $134.77
1052021720000 $134.77
1052021730000 $134.77
1052021740000 $134.77
1052021750000 $134.77
1052021760000 $134.77
1052021770000 $134.77
1052021780000 $134.77
1052021790000 $134.77
11 $1,482.47
City of Chino - LMD 2002-1 Page 19 of 80988
APN Levy Amount APN Levy Amount
CC08SP26 - LMD 2002-1 17
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020511250000 $691.05
1020511260000 $691.05
1020511270000 $691.05
1020511280000 $691.05
1020511290000 $691.05
1020511300000 $691.05
1020511310000 $691.05
1020511320000 $691.05
1020511330000 $691.05
1020511350000 $691.05
1020511360000 $691.05
1020511370000 $691.05
1020511380000 $691.05
1020511390000 $691.05
1020511400000 $691.05
1020511410000 $691.05
1020511420000 $691.05
1020511460000 $691.05
18 $12,438.90
City of Chino - LMD 2002-1 Page 20 of 80989
APN Levy Amount APN Levy Amount
CC08SP27 - LMD 2002-1 18
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052362010000 $45.31
1052362020000 $45.31
1052362030000 $45.31
1052362040000 $45.31
1052362050000 $45.31
1052362060000 $45.31
1052362070000 $45.31
1052362080000 $45.31
1052362090000 $45.31
1052362100000 $45.31
1052362110000 $45.31
1052362120000 $45.31
1052362130000 $45.31
1052362140000 $45.31
1052362150000 $45.31
1052362160000 $45.31
1052362170000 $45.31
1052362180000 $45.31
1052362190000 $45.31
1052362200000 $45.31
1052362210000 $45.31
1052362220000 $45.31
1052362230000 $45.31
1052362240000 $45.31
1052362250000 $45.31
1052362260000 $45.31
1052362270000 $45.31
1052362280000 $45.31
1052362290000 $45.31
1052362300000 $45.31
1052362310000 $45.31
1052362320000 $45.31
1052362330000 $45.31
1052362340000 $45.31
1052362350000 $45.31
1052362360000 $45.31
1052362370000 $45.31
1052362380000 $45.31
1052362390000 $45.31
1052362400000 $45.31
1052362410000 $45.31
1052362420000 $45.31
1052362430000 $45.31
1052362440000 $45.31
1052362450000 $45.31
1052362460000 $45.31
1052362470000 $45.31
1052362480000 $45.31
1052362490000 $45.31
1052362500000 $45.31
1052362510000 $45.31
1052362520000 $45.31
1052362530000 $45.31
1052362540000 $45.31
1052362550000 $45.31
1052362560000 $45.31
1052362570000 $45.31
1052362580000 $45.31
1052362590000 $45.31
1052362600000 $45.31
1052362610000 $45.31
1052362620000 $45.31
1052362630000 $45.31
1052362640000 $45.31
1052362650000 $45.31
1052362660000 $45.31
1052362670000 $45.31
1052372010000 $45.31
1052372020000 $45.31
1052372030000 $45.31
1052372040000 $45.31
1052372050000 $45.31
1052372060000 $45.31
1052372070000 $45.31
1052372080000 $45.31
1052372090000 $45.31
1052372100000 $45.31
1052372110000 $45.31
1052372120000 $45.31
1052372130000 $45.31
1052372140000 $45.31
1052372150000 $45.31
1052372160000 $45.31
1052372170000 $45.31
1052372180000 $45.31
1052372190000 $45.31
1052372200000 $45.31
1052372210000 $45.31
1052372220000 $45.31
1052372230000 $45.31
1052372290000 $45.31
1052372300000 $45.31
1052372310000 $45.31
1052372320000 $45.31
1052373010000 $45.31
1052373020000 $45.31
City of Chino - LMD 2002-1 Page 21 of 80990
APN Levy Amount APN Levy Amount
CC08SP27 - LMD 2002-1 18
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052373030000 $45.31
1052373040000 $45.31
1052373050000 $45.31
1052373060000 $45.31
1052373070000 $45.31
1052373080000 $45.31
1052373090000 $45.31
1052373100000 $45.31
1052373110000 $45.31
1052373120000 $45.31
1052373130000 $45.31
1052373140000 $45.31
1052373150000 $45.31
1052373160000 $45.31
1052373170000 $45.31
1052373180000 $45.31
1052373190000 $45.31
1052373200000 $45.31
1052373210000 $45.31
1052373220000 $45.31
1052373230000 $45.31
1052373240000 $45.31
1052373250000 $45.31
1052373260000 $45.31
1052373270000 $45.31
1052373280000 $45.31
1052373290000 $45.31
1052373300000 $45.31
1052373310000 $45.31
1052373320000 $45.31
1052373330000 $45.31
1052373340000 $45.31
1052373350000 $45.31
1052373360000 $45.31
1052373370000 $45.31
1052373380000 $45.31
1052373390000 $45.31
1052373400000 $45.31
1052373410000 $45.31
1052373420000 $45.31
1052373550000 $45.31
1052373560000 $45.31
1052373570000 $45.31
1052373580000 $45.31
1052373590000 $45.31
1052373600000 $45.31
1052373610000 $45.31
1052373620000 $45.31
1052373630000 $45.31
1052373640000 $45.31
1052373650000 $45.31
1052373660000 $45.31
1052373670000 $45.31
1052373680000 $45.31
1052373690000 $45.31
1052373710000 $45.31
1052373720000 $45.31
1052373730000 $45.31
1052373740000 $45.31
1052373750000 $45.31
1052373760000 $45.31
1052373770000 $45.31
1052373780000 $45.31
1052373790000 $45.31
1052373800000 $45.31
1052373810000 $45.31
1052373820000 $45.31
1052373840000 $45.31
1052373850000 $45.31
1052373860000 $45.31
1052592010000 $45.31
1052592020000 $45.31
1052592030000 $45.31
1052592040000 $45.31
1052592050000 $45.31
1052592060000 $45.31
1052592070000 $45.31
1052592080000 $45.31
1052592090000 $45.31
1052592100000 $45.31
1052592110000 $45.31
1052592120000 $45.31
1052592130000 $45.31
1052592140000 $45.31
1052592150000 $45.31
1052592160000 $45.31
1052592170000 $45.31
1052592180000 $45.31
1052592190000 $45.31
1052592200000 $45.31
1052592210000 $45.31
1052592220000 $45.31
1052592230000 $45.31
1052592240000 $45.31
1052592250000 $45.31
1052592260000 $45.31
City of Chino - LMD 2002-1 Page 22 of 80991
APN Levy Amount APN Levy Amount
CC08SP27 - LMD 2002-1 18
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052592270000 $45.31
1052593010000 $45.31
1052593020000 $45.31
1052593030000 $45.31
1052593040000 $45.31
1052593050000 $45.31
1052593060000 $45.31
1052593070000 $45.31
1052593080000 $45.31
1052593090000 $45.31
1052593100000 $45.31
1052593110000 $45.31
1052593120000 $45.31
1052593130000 $45.31
1052593140000 $45.31
1052593150000 $45.31
1052593160000 $45.31
1052593170000 $45.31
1052593180000 $45.31
1052593190000 $45.31
1052593200000 $45.31
1052593210000 $45.31
1052593220000 $45.31
1052593230000 $45.31
1052593240000 $45.31
1052593250000 $45.31
1052593260000 $45.31
1052593270000 $45.31
1052593280000 $45.31
1052593290000 $45.31
1052593300000 $45.31
1052593310000 $45.31
1052593320000 $45.31
1052593330000 $45.31
1052593340000 $45.31
1052593350000 $45.31
1052593360000 $45.31
1052593370000 $45.31
1052593380000 $45.31
1052593390000 $45.31
1052593400000 $45.31
1052593410000 $45.31
1052593420000 $45.31
1052593430000 $45.31
1052593440000 $45.31
1052593450000 $45.31
1052593460000 $45.31
1052593470000 $45.31
1052593480000 $45.31
1052593490000 $45.31
1052593500000 $45.31
1052593510000 $45.31
1052593520000 $45.31
1052593530000 $45.31
1052593540000 $45.31
1052593550000 $45.31
1052593560000 $45.31
1052594010000 $45.31
1052594020000 $45.31
1052594030000 $45.31
1052594040000 $45.31
1052594050000 $45.31
1052594060000 $45.31
1052594070000 $45.31
1052594080000 $45.31
1052594090000 $45.31
1052594100000 $45.31
1052594110000 $45.31
1052594120000 $45.31
1052594130000 $45.31
1052594140000 $45.31
1052594150000 $45.31
1052594160000 $45.31
1052594170000 $45.31
1052594290000 $45.31
1052594300000 $45.31
1052594310000 $45.31
1052594320000 $45.31
1052594330000 $45.31
1052594340000 $45.31
1052594350000 $45.31
1052594360000 $45.31
1052594370000 $45.31
1052594380000 $45.31
1052594390000 $45.31
1052594400000 $45.31
1052594410000 $45.31
1052594420000 $45.31
1052594430000 $45.31
1052594440000 $45.31
1052594450000 $45.31
1052594460000 $45.31
1052594470000 $45.31
1052594480000 $45.31
1052594490000 $45.31
1052594510000 $45.31
City of Chino - LMD 2002-1 Page 23 of 80992
APN Levy Amount APN Levy Amount
CC08SP27 - LMD 2002-1 18
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052594520000 $45.31
1052594530000 $45.31
1052594540000 $45.31
1052594550000 $45.31
1052594560000 $45.31
1052594570000 $45.31
1052594580000 $45.31
1052594590000 $45.31
1052594600000 $45.31
1052594610000 $45.31
1052594620000 $45.31
1052594630000 $45.31
1052594640000 $45.31
1052594650000 $45.31
1052594660000 $45.31
1052594670000 $45.31
1052594680000 $45.31
1052594690000 $45.31
1052594700000 $45.31
1052594710000 $45.31
308 $13,955.48
City of Chino - LMD 2002-1 Page 24 of 80993
APN Levy Amount APN Levy Amount
CC08SP28 - LMD 2002-1 19
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027221030000 $2,971.29
1 $2,971.29
City of Chino - LMD 2002-1 Page 25 of 80994
APN Levy Amount APN Levy Amount
CC08SP29 - LMD 2002-1 20
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021531030000 $36.14
1021531040000 $36.14
1021531050000 $36.14
1021531060000 $36.14
1021531070000 $36.14
1021531080000 $36.14
1021531090000 $36.14
1021531100000 $36.14
1021531110000 $36.14
1021531120000 $36.14
1021531130000 $36.14
1021531140000 $36.14
1021531150000 $36.14
1021531160000 $36.14
14 $505.96
City of Chino - LMD 2002-1 Page 26 of 80995
APN Levy Amount APN Levy Amount
CC08SP30 - LMD 2002-1 21
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021221240000 $185.39
1021221250000 $185.39
2 $370.78
City of Chino - LMD 2002-1 Page 27 of 80996
APN Levy Amount APN Levy Amount
CC08SP31 - LMD 2002-1 22
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021191080000 $62.07
1021191100000 $62.07
1021191110000 $62.07
1021191120000 $62.07
1021191130000 $62.07
1021191140000 $62.07
1021191150000 $62.07
1021191160000 $62.07
1021191170000 $62.07
1021191180000 $62.07
1021191190000 $62.07
1021191200000 $62.07
1021191210000 $62.07
1021191220000 $62.07
1021191230000 $62.07
15 $931.05
City of Chino - LMD 2002-1 Page 28 of 80997
APN Levy Amount APN Levy Amount
CC08SP32 - LMD 2002-1 23
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1022071240000 $23.30
1022071250000 $23.30
1022071260000 $23.30
1022071270000 $23.30
1022071280000 $23.30
1022071290000 $23.30
1022071300000 $23.30
1022071310000 $23.30
1022071320000 $23.30
1022071330000 $23.30
1022071340000 $23.30
1022071350000 $23.30
1022071360000 $23.30
1022071370000 $23.30
1022071380000 $23.30
1022071390000 $23.30
1022071400000 $23.30
1022071410000 $23.30
1022071420000 $23.30
19 $442.70
City of Chino - LMD 2002-1 Page 29 of 80998
APN Levy Amount APN Levy Amount
CC08SP33 - LMD 2002-1 24
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1013331320000 $70.31
1013331330000 $70.31
1013331340000 $70.31
1013331350000 $70.31
1013331360000 $70.31
1013331370000 $70.31
1013331380000 $70.31
1013331390000 $70.31
1013331400000 $70.31
1013331410000 $70.31
1013331420000 $70.31
1013331430000 $70.31
1013331440000 $70.31
1013331450000 $70.31
14 $984.34
City of Chino - LMD 2002-1 Page 30 of 80999
APN Levy Amount APN Levy Amount
CC08SP34 - LMD 2002-1 26
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021061090000 $57.58
1 $57.58
City of Chino - LMD 2002-1 Page 31 of 80 1000
APN Levy Amount APN Levy Amount
CC08SP35 - LMD 2002-1 27
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016211080000 $225.76
1016211090000 $225.76
1016211100000 $225.76
1016211110000 $225.76
1016211120000 $225.76
1016211130000 $225.76
1016211140000 $225.76
1016211150000 $225.76
1016211180000 $225.76
1016211190000 $225.76
1016211200000 $225.76
1016211210000 $225.76
1016211220000 $225.76
1016211230000 $225.76
1016211240000 $225.76
1016211250000 $225.76
1016211270000 $225.76
17 $3,837.92
City of Chino - LMD 2002-1 Page 32 of 80 1001
APN Levy Amount APN Levy Amount
CC08SP36 - LMD 2002-1 28
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027121290000 $104.91
1027121300000 $104.91
1027121310000 $104.91
1027121320000 $104.91
1027121330000 $104.91
1027121340000 $104.91
1027121350000 $104.91
1027121360000 $104.91
1028202260000 $104.91
9 $944.19
City of Chino - LMD 2002-1 Page 33 of 80 1002
APN Levy Amount APN Levy Amount
CC08SP37 - LMD 2002-1 29
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020211420000 $99.90
1020211430000 $99.90
1020211440000 $99.90
1020211450000 $99.90
1020211460000 $99.90
1020211470000 $99.90
1020211480000 $99.90
1020211490000 $99.90
1020211500000 $99.90
1020211510000 $99.90
1020211520000 $99.90
1020211530000 $99.90
1020211540000 $99.90
1020211550000 $99.90
1020211560000 $99.90
1020211570000 $99.90
1020211580000 $99.90
1020211590000 $99.90
1020211600000 $99.90
1020211610000 $99.90
1020211620000 $99.90
1020211630000 $99.90
22 $2,197.80
City of Chino - LMD 2002-1 Page 34 of 80 1003
APN Levy Amount APN Levy Amount
CC08SP38 - LMD 2002-1 30
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1014371580000 $177.31
1014371590000 $177.31
1014371600000 $177.31
1014371610000 $177.31
4 $709.24
City of Chino - LMD 2002-1 Page 35 of 80 1004
APN Levy Amount APN Levy Amount
CC08SP39 - LMD 2002-1 31
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1028202290000 $63.24
1028202300000 $63.24
1028202310000 $63.24
1028202320000 $63.24
1028202330000 $63.24
1028202340000 $63.24
1028202350000 $63.24
1028202360000 $63.24
1028202370000 $63.24
1028202380000 $63.24
10 $632.40
City of Chino - LMD 2002-1 Page 36 of 80 1005
APN Levy Amount APN Levy Amount
CC08SP40 - LMD 2002-1 32
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053431040000 $130.91
1053431050000 $130.91
1053431060000 $130.91
1053431070000 $130.91
1053431080000 $130.91
1053441160000 $130.91
1053441170000 $130.91
1053441180000 $130.91
1053441190000 $130.91
1053441200000 $130.91
1053441210000 $130.91
1053441220000 $130.91
1053441230000 $130.91
1053441240000 $130.91
1053441250000 $130.91
1053441260000 $130.91
1053441270000 $130.91
17 $2,225.47
City of Chino - LMD 2002-1 Page 37 of 80 1006
APN Levy Amount APN Levy Amount
CC08SP41 - LMD 2002-1 33
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056181030000 $635.44
1 $635.44
City of Chino - LMD 2002-1 Page 38 of 80 1007
APN Levy Amount APN Levy Amount
CC08SP42 - LMD 2002-1 34
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056021070000 $1,762.68
1 $1,762.68
City of Chino - LMD 2002-1 Page 39 of 80 1008
APN Levy Amount APN Levy Amount
CC08SP43 - LMD 2002-1 37
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020274030000 $164.21
1020274080000 $164.21
1020274090000 $164.21
1020274100000 $164.21
1020274110000 $164.21
1020274140000 $164.21
1020274170000 $164.21
1020274180000 $164.21
1020274190000 $164.21
1020274200000 $164.21
1020274210000 $164.21
11 $1,806.31
City of Chino - LMD 2002-1 Page 40 of 80 1009
APN Levy Amount APN Levy Amount
CC08SP44 - LMD 2002-1 38
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021142180000 $56.03
1021142190000 $56.03
1021142200000 $56.03
1021142210000 $56.03
1021142220000 $56.03
1021142230000 $56.03
1021142240000 $56.03
1021142250000 $56.03
1021142260000 $56.03
1021142270000 $56.03
10 $560.30
City of Chino - LMD 2002-1 Page 41 of 80 1010
APN Levy Amount APN Levy Amount
CC08SP45 - LMD 2002-1 39
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027041060000 $750.55
1027081030000 $750.55
1027081040000 $750.55
3 $2,251.65
City of Chino - LMD 2002-1 Page 42 of 80 1011
APN Levy Amount APN Levy Amount
CC08SP46 - LMD 2002-1 40
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020371270000 $123.02
1020371280000 $123.02
1020371290000 $123.02
1020371300000 $123.02
1020371310000 $123.02
1020371320000 $123.02
1020371330000 $123.02
1020371340000 $123.02
1020371350000 $123.02
1020371360000 $123.02
1020371370000 $123.02
11 $1,353.22
City of Chino - LMD 2002-1 Page 43 of 80 1012
APN Levy Amount APN Levy Amount
CC08SL77 - LMD 2002-1 41
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027051020000 $827.42
1 $827.42
City of Chino - LMD 2002-1 Page 44 of 80 1013
APN Levy Amount APN Levy Amount
CC08SP47 - LMD 2002-1 42
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1022051100000 $24.34
1022051110000 $24.34
1022051130000 $24.34
1022051140000 $24.34
1022051150000 $24.34
1022051160000 $24.34
1022051170000 $24.34
1022051180000 $24.34
1022051190000 $24.34
1022051200000 $24.34
1022051210000 $24.34
1022051220000 $24.34
1022051230000 $24.34
1022051240000 $24.34
1022051250000 $24.34
1022051260000 $24.34
1022051270000 $24.34
1022051280000 $24.34
1022051290000 $24.34
1022051300000 $24.34
1022051310000 $24.34
1022051320000 $24.34
1022051330000 $24.34
1022051340000 $24.34
1022051350000 $24.34
1022051360000 $24.34
1022051370000 $24.34
1022051380000 $24.34
1022051390000 $24.34
1022051400000 $24.34
1022051410000 $24.34
1022051420000 $24.34
1022051430000 $24.34
1022051440000 $24.34
1022051450000 $24.34
1022051460000 $24.34
1022051470000 $24.34
1022051480000 $24.34
1022051490000 $24.34
1022051500000 $24.34
1022051510000 $24.34
1022051520000 $24.34
42 $1,022.28
City of Chino - LMD 2002-1 Page 45 of 80 1014
APN Levy Amount APN Levy Amount
CC08SP48 - LMD 2002-1 43
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016201690000 $168.32
1016201700000 $168.32
1016201710000 $168.32
1016201720000 $168.32
1016201730000 $168.32
1016201740000 $168.32
1016201750000 $168.32
7 $1,178.24
City of Chino - LMD 2002-1 Page 46 of 80 1015
APN Levy Amount APN Levy Amount
CC08SP49 - LMD 2002-1 44
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020561160000 $36.37
1020561170000 $36.37
1020561180000 $36.37
1020561190000 $36.37
1020561200000 $36.37
1020561210000 $36.37
1020561220000 $36.37
1020561230000 $36.37
1020561240000 $36.37
1020561250000 $36.37
1020561260000 $36.37
1020561270000 $36.37
1020561280000 $36.37
1020561290000 $36.37
1020561300000 $36.37
1020561310000 $36.37
1020561320000 $36.37
1020561330000 $36.37
1020561340000 $36.37
1020561350000 $36.37
1020561360000 $36.37
1020561370000 $36.37
1020561380000 $36.37
1020561390000 $36.37
1020561400000 $36.37
1020561410000 $36.37
1020561420000 $36.37
1020561430000 $36.37
1020561440000 $36.37
1020561450000 $36.37
1020561460000 $36.37
31 $1,127.47
City of Chino - LMD 2002-1 Page 47 of 80 1016
APN Levy Amount APN Levy Amount
CC08SP50 - LMD 2002-1 45
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053431090000 $192.98
1053431100000 $192.98
1053431110000 $192.98
1053431120000 $192.98
1053431130000 $192.98
1053431140000 $192.98
1053431150000 $192.98
1053431160000 $192.98
1053431170000 $192.98
1053431180000 $192.98
1053431190000 $192.98
1053431200000 $192.98
1053431210000 $192.98
1053431220000 $192.98
1053431230000 $192.98
1053431240000 $192.98
16 $3,087.68
City of Chino - LMD 2002-1 Page 48 of 80 1017
APN Levy Amount APN Levy Amount
CC08SP51 - LMD 2002-1 48
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016211280000 $176.01
1016211290000 $176.01
1016211300000 $176.01
1016211310000 $176.01
1016211320000 $176.01
1016211330000 $176.01
1016211340000 $176.01
1016211350000 $176.01
8 $1,408.08
City of Chino - LMD 2002-1 Page 49 of 80 1018
APN Levy Amount APN Levy Amount
CC08SP52 - LMD 2002-1 49
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021142290000 $102.87
1021142300000 $102.87
1021142310000 $102.87
1021142320000 $102.87
4 $411.48
City of Chino - LMD 2002-1 Page 50 of 80 1019
APN Levy Amount APN Levy Amount
CC08SP53 - LMD 2002-1 50
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1025132020000 $164.01
1025132040000 $164.01
1025132050000 $164.01
1025132060000 $164.01
1025132070000 $164.01
1025132110000 $164.01
1025132120000 $164.01
1025132130000 $164.01
8 $1,312.08
City of Chino - LMD 2002-1 Page 51 of 80 1020
APN Levy Amount APN Levy Amount
CC08SP54 - LMD 2002-1 51
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1025133320000 $15.11
1025133330000 $15.11
1025133350000 $15.11
1025133360000 $15.11
1025133380000 $15.11
1025133390000 $15.11
1025133410000 $15.11
1025133420000 $15.11
1025133430000 $15.11
1025133440000 $15.11
1025133450000 $15.11
1025133470000 $15.11
1025133480000 $15.11
1025133500000 $15.11
1025133510000 $15.11
1025133520000 $15.11
1025133530000 $15.11
17 $256.87
City of Chino - LMD 2002-1 Page 52 of 80 1021
APN Levy Amount APN Levy Amount
CC08SP55 - LMD 2002-1 52
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1019491060000 $473.60
1019491070000 $473.60
2 $947.20
City of Chino - LMD 2002-1 Page 53 of 80 1022
APN Levy Amount APN Levy Amount
CC08SP56 - LMD 2002-1 53
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053271100000 $367.56
1 $367.56
City of Chino - LMD 2002-1 Page 54 of 80 1023
APN Levy Amount APN Levy Amount
CC08SP57 - LMD 2002-1 54
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016281010000 $332.04
1 $332.04
City of Chino - LMD 2002-1 Page 55 of 80 1024
APN Levy Amount APN Levy Amount
CC08SP58 - LMD 2002-1 55
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056161050000 $857.94
1 $857.94
City of Chino - LMD 2002-1 Page 56 of 80 1025
APN Levy Amount APN Levy Amount
CC08SP59 - LMD 2002-1 56
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053051060000 $236.00
1053051080000 $236.00
1053051100000 $236.00
1053051110000 $236.00
1053051120000 $236.00
1053051130000 $236.00
1053051140000 $236.00
1053051150000 $236.00
1053051160000 $236.00
1053051170000 $236.00
1053051180000 $236.00
11 $2,596.00
City of Chino - LMD 2002-1 Page 57 of 80 1026
APN Levy Amount APN Levy Amount
CC08SP60 - LMD 2002-1 59
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027201050000 $392.75
1027201060000 $392.75
2 $785.50
City of Chino - LMD 2002-1 Page 58 of 80 1027
APN Levy Amount APN Levy Amount
CC08SL75 - LMD 2002-1 60
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027211060000 $432.78
1 $432.78
City of Chino - LMD 2002-1 Page 59 of 80 1028
APN Levy Amount APN Levy Amount
CC08SL78 - LMD 2002-1 61
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027091030000 $2,977.58
1 $2,977.58
City of Chino - LMD 2002-1 Page 60 of 80 1029
APN Levy Amount APN Levy Amount
CC08SL76 - LMD 2002-1 62
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1027061050000 $761.58
1027061060000 $761.58
1056011080000 $761.58
3 $2,284.74
City of Chino - LMD 2002-1 Page 61 of 80 1030
APN Levy Amount APN Levy Amount
CC08SL81 - LMD 2002-1 63
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016091590000 $14.69
1016091600000 $14.69
1016091610000 $14.69
1016091620000 $14.69
1016091630000 $14.69
1016091640000 $14.69
1016091650000 $14.69
1016091660000 $14.69
1016091670000 $14.69
1016091680000 $14.69
1016091690000 $14.69
1016091700000 $14.69
1016091710000 $14.69
1016091720000 $14.69
1016091730000 $14.69
1016091740000 $14.69
1016091750000 $14.69
1016091760000 $14.69
1016091770000 $14.69
1016091780000 $14.69
1016101070000 $14.69
1016101080000 $14.69
1016101090000 $14.69
1016101100000 $14.69
1016101110000 $14.69
1016101120000 $14.69
1016101130000 $14.69
1016101140000 $14.69
1016101150000 $14.69
1016101160000 $14.69
1016101170000 $14.69
1016101180000 $14.69
1016101190000 $14.69
1016101200000 $14.69
1016101210000 $14.69
1016101220000 $14.69
1016101230000 $14.69
1016101240000 $14.69
1016101250000 $14.69
39 $572.91
City of Chino - LMD 2002-1 Page 62 of 80 1031
APN Levy Amount APN Levy Amount
CC08SL79 - LMD 2002-1 65
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053501050000 $281.77
1053501060000 $281.77
1053501070000 $281.77
3 $845.31
City of Chino - LMD 2002-1 Page 63 of 80 1032
APN Levy Amount APN Levy Amount
CC08SL82 - LMD 2002-1 66
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1015261060000 $63.47
1015261070000 $63.47
1015261080000 $63.47
1015261090000 $63.47
1015261100000 $63.47
1015261110000 $63.47
1015261120000 $63.47
1015261130000 $63.47
1015261140000 $63.47
1015261150000 $63.47
1015261160000 $63.47
1015261170000 $63.47
1015261180000 $63.47
1015261190000 $63.47
1015261200000 $63.47
1015261210000 $63.47
1015261220000 $63.47
1015261230000 $63.47
1015261240000 $63.47
1015261250000 $63.47
1015261260000 $63.47
1015261270000 $63.47
1015261280000 $63.47
1015261290000 $63.47
1015261300000 $63.47
1015261310000 $63.47
1015261320000 $63.47
1015261330000 $63.47
1015261340000 $63.47
1015261350000 $63.47
1015261360000 $63.47
1015261370000 $63.47
1015261380000 $63.47
1015261390000 $63.47
1015261400000 $63.47
1015261410000 $63.47
1015261420000 $63.47
1015261430000 $63.47
1015261440000 $63.47
1015261450000 $63.47
1015261460000 $63.47
1015261470000 $63.47
1015261480000 $63.47
1015261490000 $63.47
1015261500000 $63.47
1015261510000 $63.47
1015261520000 $63.47
1015261530000 $63.47
1015261540000 $63.47
1015261550000 $63.47
1015261560000 $63.47
1015262010000 $63.47
1015262020000 $63.47
1015262030000 $63.47
1015262040000 $63.47
1015262050000 $63.47
1015262060000 $63.47
1015262070000 $63.47
1015262080000 $63.47
1015262090000 $63.47
1015262100000 $63.47
1015262110000 $63.47
1015262120000 $63.47
1015262130000 $63.47
1015262140000 $63.47
1015262150000 $63.47
1015262160000 $63.47
1015262170000 $63.47
1015262180000 $63.47
1015262190000 $63.47
1015262200000 $63.47
1015262210000 $63.47
1015262220000 $63.47
1015262230000 $63.47
1015262240000 $63.47
1015262250000 $63.47
1015262260000 $63.47
1015262270000 $63.47
1015262280000 $63.47
1015262290000 $63.47
1015262300000 $63.47
1015262310000 $63.47
1015262320000 $63.47
1015262330000 $63.47
84 $5,331.48
City of Chino - LMD 2002-1 Page 64 of 80 1033
APN Levy Amount APN Levy Amount
CC08SL83 - LMD 2002-1 67
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053621030000 $74.00
1053621040000 $74.00
1053621050000 $74.00
1053621060000 $74.00
1053621070000 $74.00
1053621080000 $74.00
1053621090000 $74.00
1053621100000 $74.00
1053621110000 $74.00
1053621120000 $74.00
1053621130000 $74.00
1053621140000 $74.00
1053621150000 $74.00
1053621160000 $74.00
1053621170000 $74.00
1053621180000 $74.00
1053621190000 $74.00
1053621200000 $74.00
1053621210000 $74.00
1053621220000 $74.00
1053621230000 $74.00
1053621240000 $74.00
1053621250000 $74.00
1053621260000 $74.00
1053621270000 $74.00
1053621280000 $74.00
1053621290000 $74.00
1053621300000 $74.00
1053621310000 $74.00
1053621320000 $74.00
1053621330000 $74.00
1053621340000 $74.00
1053621350000 $74.00
1053621360000 $74.00
1053621370000 $74.00
1053621380000 $74.00
1053621390000 $74.00
1053621400000 $74.00
1053621410000 $74.00
1053621420000 $74.00
1053621430000 $74.00
1053621440000 $74.00
1053621450000 $74.00
1053621460000 $74.00
1053621470000 $74.00
1053621480000 $74.00
1053621490000 $74.00
1053621500000 $74.00
1053621510000 $74.00
1053621520000 $74.00
1053621530000 $74.00
1053621540000 $74.00
1053621550000 $74.00
53 $3,922.00
City of Chino - LMD 2002-1 Page 65 of 80 1034
APN Levy Amount APN Levy Amount
CC08SL91 - LMD 2002-1 68
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1052053010000 $13.70
1052053020000 $13.70
1052053030000 $13.70
1052053040000 $13.70
1052053050000 $13.70
1052053060000 $13.70
1052053070000 $13.70
1052053080000 $13.70
1052053090000 $13.70
1052053100000 $13.70
1052053110000 $13.70
1052053120000 $13.70
1052053130000 $13.70
1052053140000 $13.70
1052053150000 $13.70
1052053160000 $13.70
1052053170000 $13.70
1052053180000 $13.70
1052053190000 $13.70
1052053200000 $13.70
1052053210000 $13.70
1052053220000 $13.70
1052053230000 $13.70
1052053240000 $13.70
1052053250000 $13.70
1052053260000 $13.70
1052053270000 $13.70
1052053280000 $13.70
1052053290000 $13.70
1052053300000 $13.70
1052053310000 $13.70
1052053320000 $13.70
1052053330000 $13.70
1052053340000 $13.70
1052053350000 $13.70
1052053360000 $13.70
1052053370000 $13.70
1052053380000 $13.70
1052053390000 $13.70
1052053400000 $13.70
1052053410000 $13.70
1052053420000 $13.70
1052053430000 $13.70
1052053440000 $13.70
1052053450000 $13.70
1052053460000 $13.70
1052053470000 $13.70
1052053480000 $13.70
1052053490000 $13.70
1052053500000 $13.70
1052053510000 $13.70
1052053520000 $13.70
1052053530000 $13.70
1052053540000 $13.70
1052053550000 $13.70
1052053560000 $13.70
1052053570000 $13.70
1052053580000 $13.70
1052053590000 $13.70
1052053600000 $13.70
1052053610000 $13.70
1052053620000 $13.70
1052053630000 $13.70
1052053640000 $13.70
1052054010000 $13.70
1052054020000 $13.70
1052054030000 $13.70
1052054040000 $13.70
1052054050000 $13.70
1052054060000 $13.70
1052054070000 $13.70
1052054080000 $13.70
1052054090000 $13.70
1052054100000 $13.70
1052054110000 $13.70
1052054120000 $13.70
1052054130000 $13.70
1052054140000 $13.70
1052054150000 $13.70
1052054160000 $13.70
1052054170000 $13.70
1052054180000 $13.70
1052054190000 $13.70
1052054200000 $13.70
1052054210000 $13.70
1052054220000 $13.70
1052054230000 $13.70
1052054240000 $13.70
1052054250000 $13.70
1052054260000 $13.70
1052054270000 $13.70
1052054280000 $13.70
1052054290000 $13.70
1052054300000 $13.70
94 $1,287.80
City of Chino - LMD 2002-1 Page 66 of 80 1035
APN Levy Amount APN Levy Amount
CC08SL84 - LMD 2002-1 69
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1051643010000 $16.36
1051643020000 $16.36
1051643030000 $16.36
1051643040000 $16.36
1051643050000 $16.36
1051643060000 $16.36
1051643070000 $16.36
1051643080000 $16.36
1051643090000 $16.36
1051643100000 $16.36
1051643110000 $16.36
1051643120000 $16.36
1051643130000 $16.36
1051643140000 $16.36
1051643150000 $16.36
1051643160000 $16.36
1051643170000 $16.36
1051643180000 $16.36
1051643190000 $16.36
1051643200000 $16.36
1051643210000 $16.36
1051643220000 $16.36
1051643230000 $16.36
1051643240000 $16.36
1051643250000 $16.36
1051643260000 $16.36
1051643270000 $16.36
1051643280000 $16.36
1051643290000 $16.36
1051643300000 $16.36
1051643310000 $16.36
1051643320000 $16.36
1051643330000 $16.36
1051643340000 $16.36
1051643350000 $16.36
1051643360000 $16.36
1051643370000 $16.36
1051643380000 $16.36
1051643390000 $16.36
1051643400000 $16.36
1051643410000 $16.36
1051643420000 $16.36
1051643430000 $16.36
1051643440000 $16.36
1051643450000 $16.36
1051643460000 $16.36
1051643470000 $16.36
1051643480000 $16.36
1051643490000 $16.36
1051643500000 $16.36
1051643510000 $16.36
1051643520000 $16.36
1051643530000 $16.36
1051643540000 $16.36
1051643550000 $16.36
1051643560000 $16.36
1051643570000 $16.36
1051643580000 $16.36
1051643590000 $16.36
59 $965.24
City of Chino - LMD 2002-1 Page 67 of 80 1036
APN Levy Amount APN Levy Amount
CC08SL80 - LMD 2002-1 71
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1020091150000 $15.52
1020091160000 $15.52
1020091170000 $15.52
1020091180000 $15.52
1020091190000 $15.52
1020091200000 $15.52
1020091210000 $15.52
1020091220000 $15.52
1020091230000 $15.52
1020091240000 $15.52
1020091250000 $15.52
1020091260000 $15.52
1020091270000 $15.52
1020091280000 $15.52
1020091290000 $15.52
1020091300000 $15.52
1020091310000 $15.52
1020091320000 $15.52
1020091330000 $15.52
1020091340000 $15.52
1020091350000 $15.52
1020091360000 $15.52
1020091370000 $15.52
23 $356.96
City of Chino - LMD 2002-1 Page 68 of 80 1037
APN Levy Amount APN Levy Amount
CC08SL92 - LMD 2002-1 72
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021032080000 $331.94
1 $331.94
City of Chino - LMD 2002-1 Page 69 of 80 1038
APN Levy Amount APN Levy Amount
CC08SL93 - LMD 2002-1 75
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053501090000 $13.35
1053501100000 $13.35
1053501110000 $13.35
1053501120000 $13.35
1053501130000 $13.35
1053501140000 $13.35
1053501150000 $13.35
1053501160000 $13.35
1053501170000 $13.35
1053501180000 $13.35
1053501200000 $13.35
1053501210000 $13.35
1053501220000 $13.35
1053501230000 $13.35
1053501240000 $13.35
1053501250000 $13.35
1053501260000 $13.35
1053501270000 $13.35
1053501280000 $13.35
1053501290000 $13.35
1053501300000 $13.35
1053501310000 $13.35
1053501320000 $13.35
1053501330000 $13.35
1053501340000 $13.35
1053501350000 $13.35
1053501360000 $13.35
1053501370000 $13.35
1053501380000 $13.35
1053501390000 $13.35
1053501400000 $13.35
1053501410000 $13.35
1053501420000 $13.35
1053501430000 $13.35
1053501440000 $13.35
1053501450000 $13.35
1053501460000 $13.35
1053501470000 $13.35
1053501480000 $13.35
1053501490000 $13.35
1053501500000 $13.35
1053501510000 $13.35
1053501520000 $13.35
1053501530000 $13.35
1053501540000 $13.35
1053501550000 $13.35
1053611060000 $13.35
1053611070000 $13.35
1053611080000 $13.35
1053611090000 $13.35
1053611100000 $13.35
1053611110000 $13.35
1053611120000 $13.35
1053611130000 $13.35
1053611140000 $13.35
1053611150000 $13.35
1053611160000 $13.35
1053611170000 $13.35
1053611180000 $13.35
1053611190000 $13.35
1053611200000 $13.35
1053611210000 $13.35
1053611220000 $13.35
1053611230000 $13.35
1053611240000 $13.35
1053611250000 $13.35
1053611260000 $13.35
1053611270000 $13.35
1053611280000 $13.35
1053611290000 $13.35
1053611300000 $13.35
1053611310000 $13.35
1053611320000 $13.35
1053611330000 $13.35
1053611340000 $13.35
1053611350000 $13.35
1053612010000 $13.35
1053612020000 $13.35
1053612030000 $13.35
1053612040000 $13.35
1053612050000 $13.35
1053612060000 $13.35
1053612070000 $13.35
1053612080000 $13.35
1053612090000 $13.35
1053612100000 $13.35
1053612110000 $13.35
1053612120000 $13.35
1053612130000 $13.35
1053612140000 $13.35
1053612150000 $13.35
1053612160000 $13.35
1053612170000 $13.35
1053612180000 $13.35
1053612190000 $13.35
1053612200000 $13.35
City of Chino - LMD 2002-1 Page 70 of 80 1039
APN Levy Amount APN Levy Amount
CC08SL93 - LMD 2002-1 75
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053612210000 $13.35
1053612220000 $13.35
1053612230000 $13.35
1053612240000 $13.35
1053612250000 $13.35
1053612260000 $13.35
1053612270000 $13.35
1053612280000 $13.35
1053612290000 $13.35
1053612300000 $13.35
1053612310000 $13.35
1053612320000 $13.35
1053612330000 $13.35
1053612340000 $13.35
1053612350000 $13.35
1053612360000 $13.35
1053612370000 $13.35
1053612380000 $13.35
1053612390000 $13.35
1053612400000 $13.35
1053612410000 $13.35
1053612420000 $13.35
1053612430000 $13.35
1053612440000 $13.35
1053612450000 $13.35
1053612460000 $13.35
1053612470000 $13.35
1053612480000 $13.35
1053612490000 $13.35
1053612500000 $13.35
1053612510000 $13.35
1053612520000 $13.35
1053612530000 $13.35
1053612540000 $13.35
1053612550000 $13.35
1053612560000 $13.35
1053612570000 $13.35
1053612580000 $13.35
1053612590000 $13.35
1053612600000 $13.35
1053612610000 $13.35
1053612620000 $13.35
1053612630000 $13.35
1053612640000 $13.35
1053612650000 $13.35
1053612660000 $13.35
1053612670000 $13.35
1053612680000 $13.35
1053612690000 $13.35
1053612700000 $13.35
1053612710000 $13.35
147 $1,962.45
City of Chino - LMD 2002-1 Page 71 of 80 1040
APN Levy Amount APN Levy Amount
CC08SL94 - LMD 2002-1 77
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053061110000 $15.98
1053061120000 $15.98
1053061130000 $15.98
1053061140000 $15.98
1053061150000 $15.98
1053061160000 $15.98
1053061170000 $15.98
1053061180000 $15.98
1053061190000 $15.98
1053061200000 $15.98
1053061210000 $15.98
1053061220000 $15.98
1053061230000 $15.98
1053061240000 $15.98
1053061250000 $15.98
1053061260000 $15.98
1053061270000 $15.98
1053061280000 $15.98
1053061290000 $15.98
1053061300000 $15.98
1053061310000 $15.98
1053061320000 $15.98
1053061330000 $15.98
1053061340000 $15.98
1053061350000 $15.98
1053061360000 $15.98
1053061370000 $15.98
1053061380000 $15.98
1053061390000 $15.98
1053061400000 $15.98
1053061410000 $15.98
1053061420000 $15.98
1053061430000 $15.98
1053061440000 $15.98
1053061450000 $15.98
1053061460000 $15.98
1053061470000 $15.98
1053061480000 $15.98
1053061490000 $15.98
1053061500000 $15.98
1053061510000 $15.98
1053061520000 $15.98
1053061530000 $15.98
1053061550000 $15.98
1053061560000 $15.98
1053061570000 $15.98
1053061580000 $15.98
1053061590000 $15.98
1053061600000 $15.98
1053061610000 $15.98
1053061620000 $15.98
1053061630000 $15.98
1053061640000 $15.98
1053061650000 $15.98
1053061660000 $15.98
1053061670000 $15.98
1053061680000 $15.98
1053061690000 $15.98
1053061700000 $15.98
1053061710000 $15.98
1053061720000 $15.98
1053061730000 $15.98
1053061740000 $15.98
1053061750000 $15.98
1053061760000 $15.98
1053061770000 $15.98
1053061780000 $15.98
1053061790000 $15.98
1053061800000 $15.98
1053062010000 $15.98
1053062020000 $15.98
1053062030000 $15.98
1053062040000 $15.98
1053062050000 $15.98
1053062060000 $15.98
1053062070000 $15.98
1053062080000 $15.98
1053062090000 $15.98
1053062100000 $15.98
1053062110000 $15.98
1053062120000 $15.98
1053062130000 $15.98
1053062140000 $15.98
1053062150000 $15.98
1053062160000 $15.98
1053062170000 $15.98
1053062180000 $15.98
1053062190000 $15.98
1053062200000 $15.98
1053062210000 $15.98
1053062220000 $15.98
1053062230000 $15.98
1053062240000 $15.98
1053062260000 $15.98
1053062270000 $15.98
1053062280000 $15.98
City of Chino - LMD 2002-1 Page 72 of 80 1041
APN Levy Amount APN Levy Amount
CC08SL94 - LMD 2002-1 77
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1053062290000 $15.98
1053062300000 $15.98
1053062310000 $15.98
1053062320000 $15.98
1053062330000 $15.98
1053062350000 $15.98
1053062360000 $15.98
1053062370000 $15.98
1053062380000 $15.98
1053062390000 $15.98
1053062400000 $15.98
1053062410000 $15.98
1053062420000 $15.98
1053062430000 $15.98
1053062440000 $15.98
1053062450000 $15.98
1053062460000 $15.98
1053062470000 $15.98
1053062480000 $15.98
1053062490000 $15.98
1053062500000 $15.98
1053062510000 $15.98
1053062520000 $15.98
1053062530000 $15.98
1053062540000 $15.98
1053062550000 $15.98
122 $1,949.56
City of Chino - LMD 2002-1 Page 73 of 80 1042
APN Levy Amount APN Levy Amount
CC08SL85 - LMD 2002-1 79
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056141070000 $355.33
1 $355.33
City of Chino - LMD 2002-1 Page 74 of 80 1043
APN Levy Amount APN Levy Amount
CC08SL87 - LMD 2002-1 80
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1014272010000 $22.20
1014272020000 $22.20
1014272030000 $22.20
1014272040000 $22.20
1014272050000 $22.20
1014272060000 $22.20
1014272070000 $22.20
1014272080000 $22.20
1014272090000 $22.20
1014272100000 $22.20
1014272110000 $22.20
1014272120000 $22.20
1014272130000 $22.20
1014272140000 $22.20
1014272150000 $22.20
1014272160000 $22.20
1014272170000 $22.20
1014272180000 $22.20
1014272190000 $22.20
1014272200000 $22.20
1014272210000 $22.20
1014272220000 $22.20
1014272230000 $22.20
1014272240000 $22.20
1014272250000 $22.20
1014272260000 $22.20
1014272270000 $22.20
1014272280000 $22.20
1014272290000 $22.20
1014272300000 $22.20
1014272310000 $22.20
1014272320000 $22.20
1014272330000 $22.20
1014272340000 $22.20
1014272350000 $22.20
1014272360000 $22.20
1014273010000 $22.20
1014273020000 $22.20
1014273030000 $22.20
1014273040000 $22.20
1014273050000 $22.20
1014273060000 $22.20
1014273070000 $22.20
1014273080000 $22.20
1014273090000 $22.20
1014273100000 $22.20
1014273110000 $22.20
1014273120000 $22.20
1014273130000 $22.20
1014273140000 $22.20
1014273150000 $22.20
1014273160000 $22.20
1014273170000 $22.20
1014273180000 $22.20
1014273190000 $22.20
1014273200000 $22.20
1014273210000 $22.20
1014273220000 $22.20
1014273230000 $22.20
1014273240000 $22.20
1014273250000 $22.20
1014273260000 $22.20
1014273270000 $22.20
1014273280000 $22.20
1014273290000 $22.20
1014273300000 $22.20
1014273310000 $22.20
1014273320000 $22.20
1014273330000 $22.20
1014273340000 $22.20
1014273350000 $22.20
1014273360000 $22.20
1014273370000 $22.20
1014273380000 $22.20
1014273390000 $22.20
1014273400000 $22.20
1014273410000 $22.20
1014273420000 $22.20
1014273430000 $22.20
1014273440000 $22.20
1014273450000 $22.20
1014273460000 $22.20
1014273470000 $22.20
1014273480000 $22.20
1014273490000 $22.20
1014273500000 $22.20
1014273510000 $22.20
1014273520000 $22.20
1014273530000 $22.20
1014273540000 $22.20
1014273550000 $22.20
1014273560000 $22.20
1014273570000 $22.20
1014273580000 $22.20
94 $2,086.80
City of Chino - LMD 2002-1 Page 75 of 80 1044
APN Levy Amount APN Levy Amount
CC08SL96 - LMD 2002-1 82
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1016451250000 $782.68
1016451260000 $782.68
1016451430000 $782.68
3 $2,348.04
City of Chino - LMD 2002-1 Page 76 of 80 1045
APN Levy Amount APN Levy Amount
CC08SL97 - LMD 2002-1 83
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1056061040000 $854.31
1 $854.31
City of Chino - LMD 2002-1 Page 77 of 80 1046
APN Levy Amount APN Levy Amount
CC08SL86 - LMD 2002-1 84
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021142150000 $214.48
1 $214.48
City of Chino - LMD 2002-1 Page 78 of 80 1047
APN Levy Amount APN Levy Amount
CC08SL98 - LMD 2002-1 85
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1021361520000 $159.77
1021361530000 $159.77
2 $319.54
City of Chino - LMD 2002-1 Page 79 of 80 1048
APN Levy Amount APN Levy Amount
CC08SL98 - LMD 2002-1 85
CITY OF CHINO LMD 2002-1
Fiscal Year 2025-26 Assessment Roll
1,993 $234,594.13
Parcel Count Levy Amount
City of Chino - LMD 2002-1 Page 80 of 80 1049
Engineer’s Report
Fiscal Year 2025-2026
City of Chino
Landscape and Street Light Maintenance District
Nos. 75-1, 75-2, 76-1, 76-2, and 83-2
Prepared For
June 2025
1050
Table of Contents
Sections
Section i. Engineer’s Statement__________________________________________________i Section 1. Plans and Specifications_______________________________________________ 1 Section 2. Method of Assessment Apportionment __________________________________ 3 Section 3. Cost Estimate _______________________________________________________ 8 Section 4. Assessment Roll ____________________________________________________ 29 Tables
Table 2-1. Fiscal Year 2025-2026 Proposed Assessments _____________________________ 5 Table 3-1. Fiscal Year 2025-2026 Cost Estimate ____________________________________ 9 Appendices
Appendix A. Fiscal Year 2025-2026 Assessment Roll ________________________________ A-1 1051
i. Engineer’s Statement
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 i
AGENCY: CITY OF CHINO
PROJECT: LANDSCAPE AND STREET LIGHT MAINTENANCE DISTRICT NOS. 75-1, 75-2, 76-1, 76-2, AND 83-2 TO: CITY COUNCIL
CITY OF CHINO
STATE OF CALIFORNIA
Report Pursuant to "Landscaping and Lighting Act of 1972" Pursuant to direction from the City Council (the “City Council”) of the City of Chino (the “City”), State of California, submitted herewith is the Engineer’s Report for Landscape and Street Light Maintenance District Nos. 75-1, 75-2, 76-1, 76-2, and 83-2 (the “Report”), consisting of the following parts, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways Code of the State of California, being the "Landscaping and Lighting Act of 1972" (the “Act”), as amended, commencing with Section 22500, Article XIII D, and which is in accordance with Resolution No. 2025-031 adopted by the City of Chino City Council, San Bernardino County, California ordering the preparation of the Report for Landscape and Street Light Maintenance District Nos. 75-1, 75-2, 76-1, 76-2, and 83-2 (the “Districts”). This Report is applicable for the ensuing 12-month period, being the Fiscal Year commencing July 1, 2025, to June 30, 2026.
SECTION 1 PLANS AND SPECIFICATIONS of the improvements to be maintained and/or improved for the Fiscal Year. The plans and specifications show and describe the existing improvements and are sufficient in showing and describing the general nature, location, and extent of the improvements.
SECTION 2 The METHOD OF ASSESSMENT APPORTIONMENT calculates the receipt of special benefit and the general benefit derived from the installation and maintenance and servicing of the respective improvements located throughout the District, and the methodology used to apportion the total assessment to the properties within the District.
SECTION 3 A COST ESTIMATE of the improvements to be maintained and/or improved for the mentioned Fiscal Year.
SECTION 4 An ASSESSMENT ROLL showing the proportionate amount of the assessment to be charged in proportion to the benefits to be received by each lot or parcel within the boundaries as shown on the Diagram.
1052
i. Engineer’s Statement
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 ii
WHEREAS, on June 17, 2025, the City Council under the Act, adopted its Resolution Initiating Proceedings for the Annual Levy of Assessments and Ordering the Preparation of an Engineer’s Report for the Districts; WHEREAS, the Resolution of Initiation directed Webb Municipal Finance, LLC to prepare and file a report presenting plans and specifications describing the general nature, location, and extent of improvements to be maintained, an estimate of the costs of the maintenance, operations and servicing of the improvements for the Districts for the referenced Fiscal Year, a diagram for the Districts showing the area and properties to be assessed, and an assessment of the estimated costs of the maintenance, operations and servicing of the improvements, assessing the net amount upon all assessable lots and-or parcels within the Districts in proportion to the special benefit received;
NOW THEREFORE, the assessments are made to cover the portion of the estimated costs of maintenance, operation, and servicing of said improvements to be paid by the assessable real property within the Districts in proportion to the special benefit received.
1053
1054
1. Plans and Specifications
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 1
Landscaping and Lighting Act of 1972: Improvements
The law allows the Districts, by direct benefit assessments, to provide funding for the installation, maintenance, operation, and administration of the following improvements:
• the installation, construction, repair, renovation, or replacement of public lighting facilities, including, but not limited to, traffic signals and streetlights;
• the installation or planting of landscaping in common landscape areas; • the trimming of trees in common landscape areas;
• the installation or construction of statuary, fountains or other ornamental structures and facilities; • the installation of park or recreational improvements; • the maintenance and/or servicing of the above;
• the acquisition of land for park, recreational or open space purposes; • the installation or construction of facilities appurtenant to the above or which are necessary or convenient for the maintenance and servicing; and
• incidental expenses related to the District.
The Landscape and Lighting Act of 1972, Section 22573, provides that assessments be apportioned with reference to special benefit rather than according to assessed value. The section states:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to estimated benefits to be received by each such lot or parcel from the improvements. The determination of whether or not a lot or parcel will benefit from the improvements shall be made pursuant to the Improvement Act of 1911 (Division 7 {commencing with Section 5000}).” The Act also provides for the classification of various areas within an assessment district into different zones where:
“By reason of variations in the nature, location, and extent of the improvements, the various areas will receive differing degrees of benefit from the improvements; a zone shall consist of all territory which will receive substantially the same degree of benefit from the improvements.” As the assessments are levied on the basis of benefit, they are not a tax, and therefore are not governed by Article XIIIA of the Constitution of the State of California.
Properties owned by public agencies, such as the city, county, state, or federal government, are no longer exempt from assessment pursuant to the passage of Proposition 218. However, said public parcels will not be assessed during Fiscal Year 2025-2026 because the City of Chino invoked an exemption as noted in Article 4.6 Section 53753.5. (b)(2) of Chapter 4 Part 1 of Division 2 of Title 5 of the Government Code:
“Any assessment imposed pursuant to a petition signed by the persons owning all parcels subject to the assessment at the time the assessment is initially imposed.” When public property is not devoted to public use, it is assessed. Right-of-way owned by Southern California Edison Company and railroad operating right-of-way are also exempt from assessment.
Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 The plans and specifications for the improvements within the Districts are on file and available for public inspection in the office of the City Engineer and are part of this Report to the same extent as if said documents were attached hereto. The Assessor’s maps identifying the boundaries of the parcels located within each zone are on file in the office of the County Assessor and are by reference made a part of this Report to the same extent as if they were attached. A detailed parcel list is included as Appendix C. The general nature and extent of improvements are as follows:
1055
1. Plans and Specifications
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 2
The Districts were established to provide for the installation, ongoing maintenance, operation, and servicing of landscape and public street lighting improvements installed in connection with the development of parcels within the Districts.
Streetlights
The maintenance for streetlight improvements may include, but is not limited to, the repair, removal and replacement of all or any part necessary to provide for the normal operation of streetlights. Routine repairs include replacing of the light bulb, lamp, glassware, fuse, or photocell. Extraordinary repair includes replacement of the ballast, luminaire, or correction of a wiring problem. Also included are the energy costs of the streetlight system.
Landscaping
The maintenance for landscape improvements include, but is not limited to, the repair, removal or replacement of the landscaping: providing for the life, growth, health and beauty of the landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, and treating for disease or injury; the removal of trimmings, rubbish, debris, other solid waste; the maintenance, repair and replacement, necessary for all irrigation systems, and the removal of graffiti from walls immediately adjacent to the cultivated areas. Also included are the energy costs of the irrigation system.
The engineering drawings for the improvements to be operated and maintained by the Districts are on file in the office of the City Engineer and are available for public inspection during normal business hours. 1056
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 3
Proposition 218 Compliance
On November 5, 1996, California voters approved Proposition 218, entitled “Right to Vote on Taxes Act,” which added Article XIIID to the California Constitution. While its title refers only to taxes, Proposition 218 establishes new procedural requirements for the formation and administration of assessment districts. Proposition 218 also requires that with certain specified exceptions, which are described below, all existing assessment districts must be ratified by the property owners within the District using the new procedures.
Some of these exceptions include:
1) Any assessments imposed exclusively to finance the capital cost or maintenance and operation expenses for streets.
2) Any assessments levied pursuant to a petition signed by the persons owning all of the parcels subject to the assessment at the time the assessment was initially imposed However, even if assessments are initially exempt from Proposition 218, if the assessments are increased in the future, the City will need to comply with the provisions of Proposition 218 for that portion of the increased assessment formula (e.g., CPI increase).
Proposition 218 does not define the term “streets,” however, based on the opinions of the public agency officials, attorneys, assessment engineers, and Senate Bill 919, it has been determined that streets include all public improvements located within the street rights-of-way. This would include median and parkway landscaping, traffic signals, safety lighting, and street lighting.
Proposition 218 defines “assessment” as “any levy or charge upon real property by an agency for a special benefit conferred upon the real property,” California Constitution, Article XIII D, §2(b). A special assessment, sometimes called a “benefit assessment,” is a charge generally levied upon parcels of real property to pay for benefits the parcels receive from local improvements. Special assessments are levied according to statutory authority granted by the Legislature or, in some instances, local charters. Distinguishing among taxes, fees, and assessments can be difficult and often depends on the context in which the distinction is made. For example, taxes, assessments, and property-related fees all may be imposed on property. The key feature that distinguishes an assessment from a tax, fee, or charge is the existence of a special benefit to real property.
Without identifying a special benefit, there can be no assessment.
Distinguishing General and Special Benefit
Proposition 218 added a set of procedures and requirements, which a local government must follow to levy an assessment. In addition to notice, hearing, and assessment ballot proceedings, Proposition 218 provides that “only special benefits are assessable” and requires a local government to “separate the general benefits from the special benefits conferred on a parcel.”
By its nature, most public improvements financed through an assessment district contain an element of public benefit. The test is: does there exist, with relation to the improvement, a special benefit to the property assessed? The law requires that portion of the cost of the improvement, which benefits the public generally to be separated from that portion of the cost of the improvement, which specially benefits assessed properties.
Proposition 218 provides the following definition of “Special Benefit”:
“Special Benefit” means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large. General enhancement of property value does not constitute “special benefit”.
1057
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 4
Method of Assessment Apportionment
The law, including Article XIIID of the Constitution of the State of California, requires and the statutes, including the Proposition 218 Omnibus Implementation Act (Government Code Section 53750 and following), provide that special assessments, as levied pursuant to the “Landscaping and Lighting Act of 1972,” must be based solely on the special benefit properties receive from the improvements. The statutes do not specify the method or formula that should be used to apportion the assessment in any special assessment district proceedings. The City of Chino has retained the firm of Webb Municipal Finance, LLC for the purpose of assisting the City of Chino in making an analysis of the facts in Landscape and Street Light Maintenance District Nos. 75-1, 75-2, 76-1, 76-2, and 83-2, and recommending to the City of Chino the correct apportionment of the assessment obligation.
In performing the analysis, it was necessary to identify the benefits that the improvements being financed will render to the properties within the boundaries of these Assessment Districts and to determine the extent to which such properties receive a direct and special benefit as distinguished from that of the general public.
The method of apportionment of assessment is described below.
Street Lighting
The Street Lighting maintenance provided by the Districts applies to both Interior Street Lights and Perimeter Street Lights located within each District’s boundaries. The primary benefits of street lighting consist of safety for pedestrians, motorists and residents living and owning property in the Districts during the nighttime hours.
Street lighting increases nighttime safety on the roads and streets by improving traffic circulation and reducing nighttime accidents, improving ingress and egress to property, improving access of emergency vehicles and reduction in vandalism and other criminal activities.
Interior Street Lights are defined as those located on streets that are not considered a Primary Arterial, Major Arterial, or Secondary Arterials as identified by the City’s General Plan. Based on their location and function, these lights provide a distinct and special benefit to all developed parcels within the Districts. Each and every parcel within the Districts receives a particular and distinct benefit from the operation and on-going maintenance of the Interior Street Lights over and above any general benefits that are provided and as such, the entire cost associated with these lights is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the Districts.
Perimeter Street Lights are defined as those lights located on streets that are classified as Primary Arterials, Major Arterials, or Secondary Arterials as identified by the City’s General Plan. Based on their location and function, the Perimeter Street Lights provide both special and general benefit to all developed parcels within the various Zones in the Districts. Due to the general benefit that is provided to the surrounding community from the operation and on-going maintenance of these lights, the City contributes 50 percent (50%) of the total annual cost related to the operation and maintenance for all perimeter lights with the various Zones in the Districts. The remaining 50 percent (50%) of the operation and maintenance cost is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the Districts.
Landscaping
The landscape maintenance provided to the various zones within the Districts applies to both Interior Landscaping and Perimeter Landscaping. The primary benefits that well maintained landscaping provides are the beautification and enhancement of the desirability of the surroundings. These improvements provide special benefit to those developments that are directly adjacent to the landscape improvements as well as some general benefit. It also creates surroundings that are more pleasant for motorists, residents, equestrians, and pedestrians within the Districts.
1058
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 5
Interior Landscaping is defined as areas within each District’s boundaries that are not considered a Primary Arterial, Major Arterial, or Secondary Arterials as identified by the City’s General Plan. Each and every parcel within the Districts receives a particular and distinct benefit from the ongoing maintenance of the Interior Landscaping over and above any general benefits that are provided and as such, the entire cost associated with these areas of landscaping is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the Districts.
Perimeter Landscaping is defined as areas within each District’s boundaries that are classified as Primary Arterials, Major Arterials, or Secondary Arterials as identified by the City’s General Plan. Based on their location and purpose, the Perimeter Landscaping provides both special and general benefit to all developed parcels within the various Zones in the Districts. Due to the general benefit that is provided to the surrounding community from the ongoing maintenance of these landscaped areas, the City contributes 50 percent (50%) of the total annual cost related to any perimeter landscape maintenance with the various Zones in the Districts.
The remaining 50 percent (50%) of the maintenance cost is assessed equally to each lot or parcel of benefiting tracts or parcel maps designated by Zones within the Districts.
Each of the parcels within the zones listed below have been deemed to receive proportional special benefit from the maintenance and operation of the improvements within that zone. The Fiscal Year 2025-2026 proposed assessments per zone are as follows:
Table 3-1
Fiscal Year 2025-2026 Proposed Assessments
Levy
Benefit
Units (BU)
Maximum
Assessment per
BU
Actual
Assessment
per BU
% of
Maximum Zone Costs
75-1 $1,640.64 32 $51.27 $51.27 100.00% $3,057.11
75-2 $3,887.62 41 $94.82 $94.82 100.00% $8,565.65
76-1 $5,612.73 38 $165.84 $147.70 89.06% $7,639.72
76-2 $6,665.58 114 $58.47 $58.47 100.00% $13,856.57
83-2 Zone A $1,462.50 50 $29.25 $29.25 100.00% $2,359.68 83-2 Zone B $1,108.23 41 $27.03 $27.03 100.00% $1,751.63 83-2 Zone C $4,437.60 240 $18.49 $18.49 100.00% $6,771.20 83-2 Zone D $823.02 43 $19.14 $19.14 100.00% $1,289.62
83-2 Zone 001 $4,877.91 83 $58.77 $58.77 100.00% $7,140.58 83-2 Zone 002 $6,359.46 83 $76.62 $76.62 100.00% $11,498.48 83-2 Zone 003 $1,425.00 75 $19.00 $19.00 100.00% $2,269.52 83-2 Zone 004 $363.09 21 $17.29 $17.29 100.00% $363.09
83-2 Zone 005 $340.83 21 $16.23 $16.23 100.00% $449.64
83-2 Zone 006 $1,495.11 43 $34.77 $34.77 100.00% $1,746.45 83-2 Zone 007 $1,219.50 45 $27.10 $27.10 100.00% $4,863.28 83-2 Zone 008 $810.73 19 $42.67 $42.67 100.00% $1,205.68 83-2 Zone 009 $810.73 19 $42.67 $42.67 100.00% $1,080.78 83-2 Zone 011 $4,209.60 96 $43.85 $43.85 100.00% $10,385.91 83-2 Zone 012 $745.08 14 $53.22 $53.22 100.00% $1,473.35 83-2 Zone 013 $714.55 31 $23.05 $23.05 100.00% $1,576.51 83-2 Zone 014 $4,361.45 95 $45.91 $45.91 100.00% $6,316.86 83-2 Zone 015 $2,944.04 44 $66.91 $66.91 100.00% $7,784.73 83-2 Zone 016 $1,035.91 54 $29.25 $19.18 65.58% $1,035.91 83-2 Zone 017 $1,623.84 34 $47.76 $47.76 100.00% $3,372.45 83-2 Zone 018 $912.95 19 $48.05 $48.05 100.00% $2,133.98 83-2 Zone 019 $1,123.46 26 $43.21 $43.21 100.00% $3,264.09 1059
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 6
Levy
Benefit
Units (BU)
Maximum
Assessment per
BU
Actual
Assessment
per BU
% of
Maximum Zone Costs
83-2 Zone 020 $215,007.21 1,227 $175.23 $175.23 100.00% $528,246.90 83-2 Zone 022 $407.48 18 $35.91 $22.64 63.04% $407.48
83-2 Zone 024 $2,056.40 20 $102.82 $102.82 100.00% $3,193.25 83-2 Zone 025 $958.64 23 $41.68 $41.68 100.00% $2,664.97 83-2 Zone 026 $53.89 1 $53.89 $53.89 100.00% $69.75
83-2 Zone 027 $233.24 14 $16.66 $16.66 100.00% $348.76
83-2 Zone 028 $240.86 1 $240.86 $240.86 100.00% $349.99 83-2 Zone 029 $471.10 7 $67.30 $67.30 100.00% $568.96
83-2 Zone 030 $446.08 8 $55.76 $55.76 100.00% $458.86
83-2 Zone 031 $245.51 2 $135.28 $122.76 90.74% $245.51
83-2 Zone 032 $377.25 3 $125.75 $125.75 100.00% $1,360.61 83-2 Zone 033 $642.15 1 $642.15 $642.15 100.00% $751.37 83-2 Zone 034 $421.88 4 $105.47 $105.47 100.00% $421.88 83-2 Zone 036 $273.72 2 $136.86 $136.86 100.00% $382.11 83-2 Zone 037 $485.00 5 $97.00 $97.00 100.00% $485.00
83-2 Zone 038 $378.20 1 $378.20 $378.20 100.00% $378.20 83-2 Zone 039 $2,625.35 65 $40.39 $40.39 100.00% $3,845.08 83-2 Zone 041 $8,682.24 128 $67.83 $67.83 100.00% $19,204.28 83-2 Zone 042 $191.06 2 $122.68 $95.53 77.87% $191.06
83-2 Zone 043 $130.89 2 $111.52 $65.45 58.69% $130.89
83-2 Zone 045 $409.19 6 $72.22 $68.20 94.43% $409.19
83-2 Zone 046 $1,178.52 4 $294.63 $294.63 100.00% $1,178.52 83-2 Zone 048 $282.77 10 $28.99 $28.28 97.54% $282.77
83-2 Zone 049 $233.68 1 $233.68 $233.68 100.00% $233.68 83-2 Zone 050 $491.40 15 $38.24 $32.76 85.67% $491.40
83-2 Zone 051 $163.67 3 $72.96 $54.56 74.78% $163.67
83-2 Zone 052 $377.25 3 $125.75 $125.75 100.00% $377.25 83-2 Zone 053 $445.41 21 $21.21 $21.21 100.00% $445.41
83-2 Zone 054 $424.78 15 $29.97 $28.32 94.49% $424.78
83-2 Zone 055 $81.84 1 $163.89 $81.84 49.93% $81.84
83-2 Zone 057 $826.09 15 $55.67 $55.07 98.93% $826.09
83-2 Zone 059 $330.75 7 $47.25 $47.25 100.00% $330.75
83-2 Zone 061 $459.87 3 $153.29 $153.29 100.00% $618.13 83-2 Zone 062 $316.07 3 $270.90 $105.36 38.89% $316.07
83-2 Zone 063 $223.47 1 $233.68 $223.47 95.63% $223.47
83-2 Zone 064 $1,528.63 4 $394.00 $382.16 96.99% $1,528.63 83-2 Zone 065 $102.91 1 $151.96 $102.91 67.72% $102.91
83-2 Zone 067 $719.71 6 $392.17 $119.95 30.59% $719.71
83-2 Zone 069 $1,296.37 8 $227.38 $162.05 71.27% $1,745.94 83-2 Zone 070 $171.11 12 $19.24 $14.26 74.11% $171.11
83-2 Zone 074 $14,679.20 49 $3,693.01 $299.58 8.11% $14,679.20 83-2 Zone 076 $200.95 1 $200.95 $200.95 100.00% $209.25 83-2 Zone 078 $125.74 2 $62.87 $62.87 100.00% $191.05
83-2 Zone 079 $200.96 16 $12.56 $12.56 100.00% $200.96
83-2 Zone 080 $14,290.20 34 $420.30 $420.30 100.00% $27,230.92 83-2 Zone 082 $4,001.78 38 $105.31 $105.31 100.00% $15,117.98 83-2 Zone 086 $247.26 2 $123.63 $123.63 100.00% $292.02 83-2 Zone 087 $628.52 2 $314.26 $314.26 100.00% $999.83 1060
2. Method of Assessment Apportionment
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 7
Levy
Benefit
Units (BU)
Maximum
Assessment per
BU
Actual
Assessment
per BU
% of
Maximum Zone Costs
83-2 Zone 088 $146.32 8 $18.29 $18.29 100.00% $146.32
83-2 Zone 089 $258.17 1 $258.17 $258.17 100.00% $315.73 83-2 Zone 090 $497.04 3 $165.68 $165.68 100.00% $1,528.11 83-2 Zone 091 $206.85 1 $206.85 $206.85 100.00% $232.81 83-2 Zone 093 $309.25 5 $61.85 $61.85 100.00% $309.25
83-2 Zone 094 $69.08 2 $34.54 $34.54 100.00% $81.53
83-2 Zone 095 $565.40 8 $227.79 $70.68 31.03% $565.40
83-2 Zone 096 $326.19 3 $108.73 $108.73 100.00% $326.19 83-2 Zone 097 $211.42 2 $105.71 $105.71 100.00% $269.78 83-2 Zone 098 $6,330.41 83 $76.27 $76.27 100.00% $12,905.22 83-2 Zone 099 $207.82 2 $103.91 $103.91 100.00% $279.01 83-2 Zone 100 $779.82 6 $129.97 $129.97 100.00% $779.82 83-2 Zone 101 $61.96 1 $61.96 $61.96 100.00% $139.50
83-2 Zone 102 $11,387.38 88 $133.31 $129.40 97.07% $16,441.01 83-2 Zone 103 $4,656.40 14 $332.60 $332.60 100.00% $7,539.31 83-2 Zone 104 $154.72 1 $154.72 $154.72 100.00% $154.72 83-2 Zone 105 $154.70 5 $30.94 $30.94 100.00% $249.61
83-2 Zone 106 $82.17 1 $82.17 $82.17 100.00% $82.17
83-2 Zone 107 $107.27 1 $122.37 $107.27 87.66% $107.27
83-2 Zone 108 $7,290.36 3 $2,430.12 $2,430.12 100.00% $16,497.57 83-2 Zone 109 $1,431.72 6 $238.62 $238.62 100.00% $1,953.04 83-2 Zone 110 $56.15 4 $16.56 $14.04 84.77% $56.15
83-2 Zone 111 $429.84 3 $143.28 $143.28 100.00% $429.84 83-2 Zone 112 $12,189.02 61 $199.82 $199.82 100.00% $29,776.78 83-2 Zone 113 $13,983.64 61 $229.24 $229.24 100.00% $26,805.59 83-2 Zone 114 $19,463.04 64 $304.11 $304.11 100.00% $45,825.11 83-2 Zone 115 $4,316.80 38 $113.60 $113.60 100.00% $8,027.38 83-2 Zone 117 $1,989.36 24 $82.89 $82.89 100.00% $1,989.36 83-2 Zone 118 $154.72 1 $154.72 $154.72 100.00% $154.72 83-2 Zone 119A $81.06 10 $9.98 $8.11 81.22% $81.06
83-2 Zone 120 $256.45 2 $251.47 $128.23 50.99% $256.45
83-2 Zone 121 $248.40 1 $255.23 $248.40 97.32% $248.40
83-2 Zone 122 $1,446.60 5 $289.32 $289.32 100.00% $1,446.60 83-2 Zone 123 $64.14 1 $72.21 $64.14 88.83% $64.14
83-2 Zone 124 $76.38 2 $66.61 $38.19 57.33% $76.38
83-2 Zone 125 $140.02 3 $154.72 $46.67 30.17% $140.02
83-2 Zone 126 $226.47 3 $75.49 $75.49 100.00% $226.47
83-2 Zone 127 $349.20 12 $29.10 $29.10 100.00% $349.20
83-2 Zone 128 $5,143.53 147 $34.99 $34.99 100.00% $7,743.81 83-2 Zone 129 $386.85 15 $25.79 $25.79 100.00% $386.85
83-2 Zone 130 $26,893.10 65 $413.74 $413.74 100.00% $72,737.85 83-2 Zone 131 $703.44 19 $39.46 $37.02 93.82% $703.44
83-2 Zone 132 $1,023.06 3 $341.02 $341.02 100.00% $1,023.06 83-2 Zone 133 $107.26 3 $40.42 $35.75 88.45% $107.26
Future Annexations
There will be no future annexations to these Districts. 1061
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 8
Annual costs for the Fiscal Year include maintenance, servicing and operation of public lighting and landscaping, and incidental expenses. Incidental expenses may include engineering, consulting and legal costs for the administration of the Districts, finance department expenses for processing payments, and the cost of submittal of the annual assessments to the County of San Bernardino Auditor for placement on the tax roll.
The costs budgeted to each District’s zones, for the proposed Fiscal Year 2025-2026 assessments, were determined by the City and have been summarized in Table 3-1. 1062
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 9
Table 3-1
Fiscal Year 2025-2026 Cost Estimate
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $1,781.64 $580.63 $2,955.52 Perimeter Landscape Maintenance1 $1,398.08 $3,679.69 $4,357.76 $4,349.49 Subtotal Landscape Maintenance $1,398.08 $5,461.33 $4,938.39 $7,305.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $875.53 $1,459.22 $1,021.46 $3,502.14 Perimeter Street Light Maintenance1 $264.83 $191.87 $383.75 $698.57 Subtotal Street Light Maintenance $1,140.37 $1,651.10 $1,405.20 $4,200.71
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $1,398.08 $3,679.69 $4,357.76 $4,349.49 Lighting General Benefit - City Contribution1 $264.83 $191.87 $383.75 $698.57 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $1,662.91 $3,871.56 $4,741.51 $5,048.05
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $0.00
Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $518.66 $1,453.22 $1,296.13 $2,350.86 Subtotal Administrative Cost $518.66 $1,453.22 $1,296.13 $2,350.86 Total Cost Amount $3,057.11 $8,565.65 $7,639.72 $13,856.57 Total Amount for Levy Submission $1,640.64 $3,887.62 $5,612.73 $6,665.58 Total City Subsidy $1,416.47 $4,678.03 $2,026.99 $7,190.99
DISTRICT
Total Parcels 32 41 38 114
Total Benefit Units 32 41 38 114
Calculated Annual Assessment Rate per Benefit Unit $51.27 $94.82 $147.70 $58.47 Maximum Assessment Rate per Benefit Unit $51.27 $94.82 $147.70 $58.47 1 Amount is 50% of Calculated Cost
Budget Item 75-1 75-2 76-1 76-2
1063
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 10
Zone A Zone B Zone C Zone D Zone 001 Zone 002
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $1,980.18 Perimeter Landscape Maintenance1 $699.04 $417.14 $897.59 $0.00 $4,168.42 $5,589.83 Subtotal Landscape Maintenance $699.04 $417.14 $897.59 $0.00 $4,168.42 $7,570.01
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $970.72 $746.71 $3,882.88 $896.05 $1,194.73 $1,658.76 Perimeter Street Light Maintenance1 $289.59 $290.61 $841.96 $174.78 $565.98 $318.92 Subtotal Street Light Maintenance $1,260.31 $1,037.32 $4,724.84 $1,070.83 $1,760.71 $1,977.68
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $699.04 $417.14 $897.59 $0.00 $4,168.42 $5,589.83 Lighting General Benefit - City Contribution1 $289.59 $290.61 $841.96 $174.78 $565.98 $318.92 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $988.63 $707.75 $1,739.55 $174.78 $4,734.40 $5,908.75
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $400.34 $297.18 $1,148.78 $218.79 $1,211.44 $1,950.79 Subtotal Administrative Cost $400.34 $297.18 $1,148.78 $218.79 $1,211.44 $1,950.79 Total Cost Amount $2,359.68 $1,751.63 $6,771.20 $1,289.62 $7,140.58 $11,498.48 Total Amount for Levy Submission $1,462.50 $1,108.23 $4,437.60 $823.02 $4,877.91 $6,359.46 Total City Subsidy $897.18 $643.40 $2,333.60 $466.60 $2,262.67 $5,139.02
DISTRICT
Total Parcels 50 41 240 43 83 83
Total Benefit Units 50 41 240 43 83 83
Calculated Annual Assessment Rate per Benefit Unit $29.25 $27.03 $18.49 $19.14 $58.77 $76.62 Maximum Assessment Rate per Benefit Unit $29.25 $27.03 $18.49 $19.14 $58.77 $76.62 1 Amount is 50% of Calculated Cost
LLMD 83-2
Budget Item
1064
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 11
Zone 003 Zone 004 Zone 005 Zone 006 Zone 007 Zone 008
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $2,939.77 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $496.19 $266.04 $719.20 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $496.19 $3,205.81 $719.20
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $1,613.76 $224.01 $373.35 $896.05 $672.04 $224.01 Perimeter Street Light Maintenance1 $270.72 $57.92 $0.00 $57.92 $160.35 $57.92 Subtotal Street Light Maintenance $1,884.48 $281.93 $373.35 $953.97 $832.39 $281.93
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $496.19 $266.04 $719.20 Lighting General Benefit - City Contribution1 $270.72 $57.92 $0.00 $57.92 $160.35 $57.92 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $270.72 $57.92 $0.00 $554.11 $426.39 $777.12
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $23.56 $0.00 $0.00 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $23.56 $0.00 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $385.04 $57.60 $76.28 $296.30 $825.09 $204.55 Subtotal Administrative Cost $385.04 $57.60 $76.28 $296.30 $825.09 $204.55 Total Cost Amount $2,269.52 $363.09 $449.64 $1,746.45 $4,863.28 $1,205.68 Total Amount for Levy Submission $1,425.00 $363.09 $340.83 $1,495.11 $1,219.50 $810.73 Total City Subsidy $844.52 $0.00 $108.81 $251.34 $3,643.78 $394.95
DISTRICT
Total Parcels 75 21 21 43 45 19
Total Benefit Units 75 21 21 43 45 19
Calculated Annual Assessment Rate per Benefit Unit $19.00 $17.29 $16.23 $34.77 $27.10 $42.67 Maximum Assessment Rate per Benefit Unit $19.00 $17.29 $16.23 $34.77 $27.10 $42.67 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1065
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 12
Zone 009 Zone 011 Zone 012 Zone 013 Zone 014 Zone 015
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $4,281.29 $184.11 $219.52 $0.00 $3,260.08 Perimeter Landscape Maintenance1 $540.82 $2,570.66 $609.51 $510.42 $3,578.00 $2,297.68 Subtotal Landscape Maintenance $540.82 $6,851.95 $793.62 $729.94 $3,578.00 $5,557.76
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $298.68 $1,344.07 $298.68 $448.02 $1,344.07 $746.71 Perimeter Street Light Maintenance1 $57.92 $427.85 $131.08 $131.08 $323.09 $159.53 Subtotal Street Light Maintenance $356.60 $1,771.93 $429.77 $579.11 $1,667.17 $906.24
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $540.82 $2,570.66 $609.51 $510.42 $3,578.00 $2,297.68 Lighting General Benefit - City Contribution1 $57.92 $427.85 $131.08 $131.08 $323.09 $159.53 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $598.73 $2,998.52 $740.59 $641.50 $3,901.09 $2,457.21
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $183.36 $1,762.04 $249.96 $267.47 $1,071.70 $1,320.73 Subtotal Administrative Cost $183.36 $1,762.04 $249.96 $267.47 $1,071.70 $1,320.73 Total Cost Amount $1,080.78 $10,385.91 $1,473.35 $1,576.51 $6,316.86 $7,784.73 Total Amount for Levy Submission $810.73 $4,209.60 $745.08 $714.55 $4,361.45 $2,944.04 Total City Subsidy $270.05 $6,176.31 $728.27 $861.96 $1,955.41 $4,840.69
DISTRICT
Total Parcels 19 96 14 31 95 44
Total Benefit Units 19 96 14 31 95 44
Calculated Annual Assessment Rate per Benefit Unit $42.67 $43.85 $53.22 $23.05 $45.91 $66.91 Maximum Assessment Rate per Benefit Unit $42.67 $43.85 $53.22 $23.05 $45.91 $66.91 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1066
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 13
Zone 016 Zone 017 Zone 018 Zone 019 Zone 020 Zone 022
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $552.87 $675.36 $1,511.89 $237,312.02 $0.00 Perimeter Landscape Maintenance1 $0.00 $1,401.63 $797.90 $652.82 $166,668.69 $0.00 Subtotal Landscape Maintenance $0.00 $1,954.50 $1,473.26 $2,164.71 $403,980.71 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $672.04 $672.04 $298.68 $298.68 $26,582.78 $298.68 Perimeter Street Light Maintenance1 $87.39 $173.75 $0.00 $246.92 $7,313.22 $0.00 Subtotal Street Light Maintenance $759.43 $845.79 $298.68 $545.60 $33,896.00 $298.68
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $749.70 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $749.70 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $1,401.63 $797.90 $652.82 $166,668.69 $0.00 Lighting General Benefit - City Contribution1 $87.39 $173.75 $0.00 $246.92 $7,313.22 $0.00 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $749.70 $0.00 Subtotal General Benefit Expenses - Contributions $87.39 $1,575.39 $797.90 $899.74 $174,731.61 $0.00
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $121.32 $0.00 $0.00 $0.00 $0.00 $47.77 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $121.32 $0.00 $0.00 $0.00 $0.00 $47.77
ADMINISTRATION
Total Annual District Administration $155.17 $572.16 $362.04 $553.77 $89,620.49 $61.03 Subtotal Administrative Cost $155.17 $572.16 $362.04 $553.77 $89,620.49 $61.03 Total Cost Amount $1,035.91 $3,372.45 $2,133.98 $3,264.09 $528,246.90 $407.48 Total Amount for Levy Submission $1,035.91 $1,623.84 $912.95 $1,123.46 $215,007.21 $407.48 Total City Subsidy $0.00 $1,748.61 $1,221.03 $2,140.63 $313,239.69 $0.00
DISTRICT
Total Parcels 54 34 19 26 1,227 18
Total Benefit Units 54 34 19 26 1,227 18
Calculated Annual Assessment Rate per Benefit Unit $19.18 $47.76 $48.05 $43.21 $175.23 $22.64 Maximum Assessment Rate per Benefit Unit $29.25 $47.76 $48.05 $43.21 $175.23 $35.91 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1067
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 14
Zone 024 Zone 025 Zone 026 Zone 027 Zone 028 Zone 029
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $2,265.42 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $2,265.42 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $298.68 $1,344.07 $0.00 $0.00 $0.00 $298.68 Perimeter Street Light Maintenance1 $87.39 $868.77 $57.92 $289.59 $290.61 $173.75 Subtotal Street Light Maintenance $386.07 $2,212.84 $57.92 $289.59 $290.61 $472.44
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $2,265.42 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $87.39 $868.77 $57.92 $289.59 $290.61 $173.75 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $2,352.81 $868.77 $57.92 $289.59 $290.61 $173.75
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $541.76 $452.13 $11.83 $59.17 $59.38 $96.53 Subtotal Administrative Cost $541.76 $452.13 $11.83 $59.17 $59.38 $96.53 Total Cost Amount $3,193.25 $2,664.97 $69.75 $348.76 $349.99 $568.96 Total Amount for Levy Submission $2,056.40 $958.64 $53.89 $233.24 $240.86 $471.10 Total City Subsidy $1,136.85 $1,706.33 $15.86 $115.52 $109.13 $97.86
DISTRICT
Total Parcels 20 23 1 14 1 7
Total Benefit Units 20 23 1 14 1 7
Calculated Annual Assessment Rate per Benefit Unit $102.82 $41.68 $53.89 $16.66 $240.86 $67.30 Maximum Assessment Rate per Benefit Unit $102.82 $41.68 $53.89 $16.66 $240.86 $67.30 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1068
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 15
Zone 030 Zone 031 Zone 032 Zone 033 Zone 034 Zone 036
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $149.34 $0.00 $579.18 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $231.67 $173.75 $550.59 $623.90 $334.31 $317.28 Subtotal Street Light Maintenance $381.01 $173.75 $1,129.77 $623.90 $334.31 $317.28
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $231.67 $173.75 $550.59 $623.90 $334.31 $317.28 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $231.67 $173.75 $550.59 $623.90 $334.31 $317.28
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $36.26 $0.00 $0.00 $19.26 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $36.26 $0.00 $0.00 $19.26 $0.00
ADMINISTRATION
Total Annual District Administration $77.85 $35.50 $230.84 $127.48 $68.31 $64.83 Subtotal Administrative Cost $77.85 $35.50 $230.84 $127.48 $68.31 $64.83 Total Cost Amount $458.86 $245.51 $1,360.61 $751.37 $421.88 $382.11 Total Amount for Levy Submission $446.08 $245.51 $377.25 $642.15 $421.88 $273.72 Total City Subsidy $12.78 $0.00 $983.36 $109.22 $0.00 $108.39
DISTRICT
Total Parcels 8 2 3 1 4 2
Total Benefit Units 8 2 3 1 4 2
Calculated Annual Assessment Rate per Benefit Unit $55.76 $122.76 $125.75 $642.15 $105.47 $136.86 Maximum Assessment Rate per Benefit Unit $55.76 $135.28 $125.75 $642.15 $105.47 $136.86 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1069
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 16
Zone 037 Zone 038 Zone 039 Zone 041 Zone 042 Zone 043
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $1,510.32 $15,383.66 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $1,510.32 $15,383.66 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $1,493.41 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $305.86 $246.92 $189.00 $562.49 $135.39 $95.94 Subtotal Street Light Maintenance $305.86 $246.92 $1,682.42 $562.49 $135.39 $95.94
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $1,510.32 $15,383.66 $0.00 $0.00 Lighting General Benefit - City Contribution1 $305.86 $246.92 $189.00 $562.49 $135.39 $95.94 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $305.86 $246.92 $1,699.32 $15,946.15 $135.39 $95.94
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $116.64 $80.83 $0.00 $0.00 $28.00 $15.35 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $116.64 $80.83 $0.00 $0.00 $28.00 $15.35
ADMINISTRATION
Total Annual District Administration $62.49 $50.45 $652.34 $3,258.13 $27.66 $19.60 Subtotal Administrative Cost $62.49 $50.45 $652.34 $3,258.13 $27.66 $19.60 Total Cost Amount $485.00 $378.20 $3,845.08 $19,204.28 $191.06 $130.89 Total Amount for Levy Submission $485.00 $378.20 $2,625.35 $8,682.24 $191.06 $130.89 Total City Subsidy $0.00 $0.00 $1,219.73 $10,522.04 $0.00 $0.00
DISTRICT
Total Parcels 5 1 65 128 2 2
Total Benefit Units 5 1 65 128 2 2
Calculated Annual Assessment Rate per Benefit Unit $97.00 $378.20 $40.39 $67.83 $95.53 $65.45 Maximum Assessment Rate per Benefit Unit $97.00 $378.20 $40.39 $67.83 $122.68 $111.52 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1070
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 17
Zone 045 Zone 046 Zone 048 Zone 049 Zone 050 Zone 051
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $396.50 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $396.50 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $149.34 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $289.59 $401.39 $57.92 $131.08 $347.51 $115.84 Subtotal Street Light Maintenance $289.59 $401.39 $207.26 $131.08 $347.51 $115.84
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $396.50 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $289.59 $401.39 $57.92 $131.08 $347.51 $115.84 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $289.59 $797.89 $57.92 $131.08 $347.51 $115.84
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $60.43 $217.60 $33.16 $65.54 $72.89 $24.17 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $10.27 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $60.43 $217.60 $33.16 $75.81 $72.89 $24.17
ADMINISTRATION
Total Annual District Administration $59.17 $163.03 $42.35 $26.78 $71.00 $23.67 Subtotal Administrative Cost $59.17 $163.03 $42.35 $26.78 $71.00 $23.67 Total Cost Amount $409.19 $1,178.52 $282.77 $233.68 $491.40 $163.67 Total Amount for Levy Submission $409.19 $1,178.52 $282.77 $233.68 $491.40 $163.67 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 6 4 10 1 15 3
Total Benefit Units 6 4 10 1 15 3
Calculated Annual Assessment Rate per Benefit Unit $68.20 $294.63 $28.28 $233.68 $32.76 $54.56 Maximum Assessment Rate per Benefit Unit $72.22 $294.63 $28.99 $233.68 $38.24 $72.96 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1071
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 18
Zone 052 Zone 053 Zone 054 Zone 055 Zone 057 Zone 059
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $224.01 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $289.59 $358.17 $87.39 $57.92 $579.31 $115.84 Subtotal Street Light Maintenance $289.59 $358.17 $311.40 $57.92 $579.31 $115.84
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $289.59 $358.17 $87.39 $57.92 $579.31 $115.84 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $289.59 $358.17 $87.39 $57.92 $579.31 $115.84
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $28.49 $14.05 $49.75 $12.09 $128.41 $57.92 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $133.33 Subtotal Capital Improvement and Reserve Funding $28.49 $14.05 $49.75 $12.09 $128.41 $191.25
ADMINISTRATION
Total Annual District Administration $59.17 $73.18 $63.63 $11.83 $118.37 $23.67 Subtotal Administrative Cost $59.17 $73.18 $63.63 $11.83 $118.37 $23.67 Total Cost Amount $377.25 $445.41 $424.78 $81.84 $826.09 $330.75 Total Amount for Levy Submission $377.25 $445.41 $424.78 $81.84 $826.09 $330.75 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 3 21 15 1 15 7
Total Benefit Units 3 21 15 1 15 7
Calculated Annual Assessment Rate per Benefit Unit $125.75 $21.21 $28.32 $81.84 $55.07 $47.25 Maximum Assessment Rate per Benefit Unit $125.75 $21.21 $29.97 $163.89 $55.67 $47.25 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1072
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 19
Zone 061 Zone 062 Zone 063 Zone 064 Zone 065 Zone 067
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $174.78 $115.84 $0.00 $0.00 $0.00 $448.02 Perimeter Street Light Maintenance1 $338.48 $115.84 $131.08 $270.78 $43.69 $0.00 Subtotal Street Light Maintenance $513.26 $231.67 $131.08 $270.78 $43.69 $448.02
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $338.48 $115.84 $131.08 $270.78 $43.69 $0.00 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $338.48 $115.84 $131.08 $270.78 $43.69 $0.00
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $37.07 $65.54 $135.39 $21.85 $180.15 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.06 $1,067.13 $28.44 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $37.07 $65.60 $1,202.52 $50.29 $180.15
ADMINISTRATION
Total Annual District Administration $104.87 $47.34 $26.78 $55.33 $8.93 $91.54 Subtotal Administrative Cost $104.87 $47.34 $26.78 $55.33 $8.93 $91.54 Total Cost Amount $618.13 $316.07 $223.47 $1,528.63 $102.91 $719.71 Total Amount for Levy Submission $459.87 $316.07 $223.47 $1,528.63 $102.91 $719.71 Total City Subsidy $158.26 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 3 3 1 4 1 6
Total Benefit Units 3 3 1 4 1 6
Calculated Annual Assessment Rate per Benefit Unit $153.29 $105.36 $223.47 $382.16 $102.91 $119.95 Maximum Assessment Rate per Benefit Unit $153.29 $270.90 $233.68 $394.00 $151.96 $392.17 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1073
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 20
Zone 069 Zone 070 Zone 074 Zone 076 Zone 078 Zone 079
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $888.09 $0.00 $7,425.78 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $888.09 $0.00 $7,425.78 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $298.68 $0.00 $0.00 $0.00 $158.64 $0.00 Perimeter Street Light Maintenance1 $115.84 $43.69 $1,275.21 $173.75 $0.00 $87.39 Subtotal Street Light Maintenance $414.52 $43.69 $1,275.21 $173.75 $158.64 $87.39
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $147.12 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $147.12 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $888.09 $0.00 $7,425.78 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $115.84 $43.69 $1,275.21 $173.75 $0.00 $87.39 Equestrian General Benefit - City Contribution1 $147.12 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $1,151.05 $43.69 $8,701.00 $173.75 $0.00 $87.39
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $21.85 $4,200.41 $0.00 $0.00 $43.69 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $96.64 $0.00 $0.00 $0.00 $52.02 Subtotal Capital Improvement and Reserve Funding $0.00 $118.49 $4,200.41 $0.00 $0.00 $95.72
ADMINISTRATION
Total Annual District Administration $296.21 $8.93 $1,777.79 $35.50 $32.41 $17.86 Subtotal Administrative Cost $296.21 $8.93 $1,777.79 $35.50 $32.41 $17.86 Total Cost Amount $1,745.94 $171.11 $14,679.20 $209.25 $191.05 $200.96 Total Amount for Levy Submission $1,296.37 $171.11 $14,679.20 $200.95 $125.74 $200.96 Total City Subsidy $449.57 $0.00 $0.00 $8.30 $65.31 $0.00
DISTRICT
Total Parcels 8 12 49 1 2 16
Total Benefit Units 8 12 49 1 2 16
Calculated Annual Assessment Rate per Benefit Unit $162.05 $14.26 $299.58 $200.95 $62.87 $12.56 Maximum Assessment Rate per Benefit Unit $227.38 $19.24 $3,693.01 $200.95 $62.87 $12.56 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1074
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 21
Zone 080 Zone 082 Zone 086 Zone 087 Zone 088 Zone 089
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $18,236.00 $6,328.92 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $18,236.00 $6,328.92 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $1,153.16 $1,269.40 $0.00 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $3,221.86 $343.68 $242.47 $830.20 $115.84 $262.17 Subtotal Street Light Maintenance $4,375.02 $1,613.08 $242.47 $830.20 $115.84 $262.17
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $4,611.11 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $4,611.11 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $18,236.00 $6,328.92 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $3,221.86 $343.68 $242.47 $830.20 $115.84 $262.17 Equestrian General Benefit - City Contribution1 $0.00 $4,611.11 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $21,457.86 $11,283.71 $242.47 $830.20 $115.84 $262.17
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $0.00 $6.82 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $0.00 $6.82 $0.00
ADMINISTRATION
Total Annual District Administration $4,619.90 $2,564.86 $49.54 $169.63 $23.67 $53.57 Subtotal Administrative Cost $4,619.90 $2,564.86 $49.54 $169.63 $23.67 $53.57 Total Cost Amount $27,230.92 $15,117.98 $292.02 $999.83 $146.32 $315.73 Total Amount for Levy Submission $14,290.20 $4,001.78 $247.26 $628.52 $146.32 $258.17 Total City Subsidy $12,940.72 $11,116.20 $44.76 $371.31 $0.00 $57.56
DISTRICT
Total Parcels 34 38 2 2 8 1
Total Benefit Units 34 38 2 2 8 1
Calculated Annual Assessment Rate per Benefit Unit $420.30 $105.31 $123.63 $314.26 $18.29 $258.17 Maximum Assessment Rate per Benefit Unit $420.30 $105.31 $123.63 $314.26 $18.29 $258.17 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1075
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 22
Zone 090 Zone 091 Zone 093 Zone 094 Zone 095 Zone 096
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $38.54 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $38.54 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $1,268.86 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $0.00 $193.31 $57.92 $67.70 $160.56 $251.23 Subtotal Street Light Maintenance $1,268.86 $193.31 $57.92 $67.70 $160.56 $251.23
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $38.54 $0.00 Lighting General Benefit - City Contribution1 $0.00 $193.31 $57.92 $67.70 $160.56 $251.23 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $0.00 $193.31 $57.92 $67.70 $199.10 $251.23
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $28.96 $0.00 $99.55 $23.63 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $210.54 $0.00 $226.08 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $239.50 $0.00 $325.63 $23.63
ADMINISTRATION
Total Annual District Administration $259.25 $39.50 $11.83 $13.83 $40.68 $51.33 Subtotal Administrative Cost $259.25 $39.50 $11.83 $13.83 $40.68 $51.33 Total Cost Amount $1,528.11 $232.81 $309.25 $81.53 $565.40 $326.19 Total Amount for Levy Submission $497.04 $206.85 $309.25 $69.08 $565.40 $326.19 Total City Subsidy $1,031.07 $25.96 $0.00 $12.45 $0.00 $0.00
DISTRICT
Total Parcels 3 1 5 2 8 3
Total Benefit Units 3 1 5 2 8 3
Calculated Annual Assessment Rate per Benefit Unit $165.68 $206.85 $61.85 $34.54 $70.68 $108.73 Maximum Assessment Rate per Benefit Unit $165.68 $206.85 $61.85 $34.54 $227.79 $108.73 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1076
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 23
Zone 097 Zone 098 Zone 099 Zone 100 Zone 101 Zone 102
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $3,176.61 $0.00 $0.00 $0.00 $1,244.38 Perimeter Landscape Maintenance1 $0.00 $5,450.84 $0.00 $0.00 $0.00 $10,010.87 Subtotal Landscape Maintenance $0.00 $8,627.45 $0.00 $0.00 $0.00 $11,255.25
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $224.01 $1,642.76 $0.00 $0.00 $0.00 $1,922.57 Perimeter Street Light Maintenance1 $0.00 $445.56 $231.67 $638.12 $115.84 $473.87 Subtotal Street Light Maintenance $224.01 $2,088.32 $231.67 $638.12 $115.84 $2,396.44
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $5,450.84 $0.00 $0.00 $0.00 $10,010.87 Lighting General Benefit - City Contribution1 $0.00 $445.56 $231.67 $638.12 $115.84 $473.87 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $0.00 $5,896.40 $231.67 $638.12 $115.84 $10,484.74
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.00 $0.00 $11.32 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.00 $0.00 $11.32 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $45.77 $2,189.45 $47.34 $130.38 $23.67 $2,789.32 Subtotal Administrative Cost $45.77 $2,189.45 $47.34 $130.38 $23.67 $2,789.32 Total Cost Amount $269.78 $12,905.22 $279.01 $779.82 $139.50 $16,441.01 Total Amount for Levy Submission $211.42 $6,330.41 $207.82 $779.82 $61.96 $11,387.38 Total City Subsidy $58.36 $6,574.81 $71.19 $0.00 $77.54 $5,053.63
DISTRICT
Total Parcels 2 83 2 6 1 88
Total Benefit Units 2 83 2 6 1 88
Calculated Annual Assessment Rate per Benefit Unit $105.71 $76.27 $103.91 $129.97 $61.96 $129.40 Maximum Assessment Rate per Benefit Unit $105.71 $76.27 $103.91 $129.97 $61.96 $133.31 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1077
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 24
Zone 103 Zone 104 Zone 105 Zone 106 Zone 107 Zone 108
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $8,626.05 Perimeter Landscape Maintenance1 $5,717.29 $0.00 $0.00 $0.00 $0.00 $2,060.88 Subtotal Landscape Maintenance $5,717.29 $0.00 $0.00 $0.00 $0.00 $10,686.93
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $224.01 $0.00 $149.34 $0.00 $74.67 $3,011.72 Perimeter Street Light Maintenance1 $318.92 $115.84 $57.92 $67.70 $0.00 $0.00 Subtotal Street Light Maintenance $542.94 $115.84 $207.26 $67.70 $74.67 $3,011.72
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $5,717.29 $0.00 $0.00 $0.00 $0.00 $2,060.88 Lighting General Benefit - City Contribution1 $318.92 $115.84 $57.92 $67.70 $0.00 $0.00 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $6,036.21 $115.84 $57.92 $67.70 $0.00 $2,060.88
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $15.22 $0.00 $0.64 $17.34 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $15.22 $0.00 $0.64 $17.34 $0.00
ADMINISTRATION
Total Annual District Administration $1,279.09 $23.67 $42.35 $13.83 $15.26 $2,798.92 Subtotal Administrative Cost $1,279.09 $23.67 $42.35 $13.83 $15.26 $2,798.92 Total Cost Amount $7,539.31 $154.72 $249.61 $82.17 $107.27 $16,497.57 Total Amount for Levy Submission $4,656.40 $154.72 $154.70 $82.17 $107.27 $7,290.36 Total City Subsidy $2,882.91 $0.00 $94.91 $0.00 $0.00 $9,207.21
DISTRICT
Total Parcels 14 1 5 1 1 3
Total Benefit Units 14 1 5 1 1 3
Calculated Annual Assessment Rate per Benefit Unit $332.60 $154.72 $30.94 $82.17 $107.27 $2,430.12 Maximum Assessment Rate per Benefit Unit $332.60 $154.72 $30.94 $82.17 $122.37 $2,430.12 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1078
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 25
Zone 109 Zone 110 Zone 111 Zone 112 Zone 113 Zone 114
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $11,773.10 $5,671.30 $13,810.77 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $11,226.77 $14,480.45 $17,396.31 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $22,999.87 $20,151.75 $31,207.08
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $224.01 $1,493.41 $1,642.76 $2,688.15 Perimeter Street Light Maintenance1 $1,621.70 $37.34 $115.84 $231.67 $463.34 $831.16 Subtotal Street Light Maintenance $1,621.70 $37.34 $339.85 $1,725.09 $2,106.10 $3,519.30
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $2,616.91 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $707.29 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $3,324.20
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $11,226.77 $14,480.45 $17,396.31 Lighting General Benefit - City Contribution1 $1,621.70 $37.34 $115.84 $231.67 $463.34 $831.16 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $707.29 Subtotal General Benefit Expenses - Contributions $1,621.70 $37.34 $115.84 $11,458.44 $14,943.79 $18,934.76
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $11.19 $20.55 $0.00 $0.00 $0.00 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $11.19 $20.55 $0.00 $0.00 $0.00
ADMINISTRATION
Total Annual District Administration $331.35 $7.63 $69.44 $5,051.82 $4,547.74 $7,774.52 Subtotal Administrative Cost $331.35 $7.63 $69.44 $5,051.82 $4,547.74 $7,774.52 Total Cost Amount $1,953.04 $56.15 $429.84 $29,776.78 $26,805.59 $45,825.11 Total Amount for Levy Submission $1,431.72 $56.15 $429.84 $12,189.02 $13,983.64 $19,463.04 Total City Subsidy $521.32 $0.00 $0.00 $17,587.76 $12,821.95 $26,362.07
DISTRICT
Total Parcels 6 4 3 61 61 64
Total Benefit Units 6 4 3 61 61 64
Calculated Annual Assessment Rate per Benefit Unit $238.62 $14.04 $143.28 $199.82 $229.24 $304.11 Maximum Assessment Rate per Benefit Unit $238.62 $16.56 $143.28 $199.82 $229.24 $304.11 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1079
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 26
Zone 115 Zone 117 Zone 118 Zone 119A Zone 120 Zone 121
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $2,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $2,783.86 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $5,703.86 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $672.04 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Street Light Maintenance1 $289.59 $270.78 $57.92 $57.92 $203.09 $87.39 Subtotal Street Light Maintenance $961.63 $270.78 $57.92 $57.92 $203.09 $87.39
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $2,783.86 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $289.59 $270.78 $57.92 $57.92 $203.09 $87.39 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $3,073.45 $270.78 $57.92 $57.92 $203.09 $87.39
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $135.39 $28.96 $11.31 $11.87 $43.69 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $1,527.86 $56.01 $0.00 $0.00 $99.46 Subtotal Capital Improvement and Reserve Funding $0.00 $1,663.25 $84.97 $11.31 $11.87 $143.15
ADMINISTRATION
Total Annual District Administration $1,361.90 $55.33 $11.83 $11.83 $41.50 $17.86 Subtotal Administrative Cost $1,361.90 $55.33 $11.83 $11.83 $41.50 $17.86 Total Cost Amount $8,027.38 $1,989.36 $154.72 $81.06 $256.45 $248.40 Total Amount for Levy Submission $4,316.80 $1,989.36 $154.72 $81.06 $256.45 $248.40 Total City Subsidy $3,710.58 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 38 24 1 10 2 1
Total Benefit Units 38 24 1 10 2 1
Calculated Annual Assessment Rate per Benefit Unit $113.60 $82.89 $154.72 $8.11 $128.23 $248.40 Maximum Assessment Rate per Benefit Unit $113.60 $82.89 $154.72 $9.98 $251.47 $255.23 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1080
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 27
Zone 122 Zone 123 Zone 124 Zone 125 Zone 126 Zone 127
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $873.89 $0.00 $0.00 $0.00 $0.00 $74.67 Perimeter Street Light Maintenance1 $173.75 $43.69 $43.69 $57.92 $173.75 $203.09 Subtotal Street Light Maintenance $1,047.65 $43.69 $43.69 $57.92 $173.75 $277.76
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $173.75 $43.69 $43.69 $57.92 $173.75 $203.09 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $173.75 $43.69 $43.69 $57.92 $173.75 $203.09
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $184.90 $11.52 $21.85 $28.96 $17.22 $14.69 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $1.91 $41.31 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $184.90 $11.52 $23.75 $70.27 $17.22 $14.69
ADMINISTRATION
Total Annual District Administration $214.06 $8.93 $8.93 $11.83 $35.50 $56.75 Subtotal Administrative Cost $214.06 $8.93 $8.93 $11.83 $35.50 $56.75 Total Cost Amount $1,446.60 $64.14 $76.38 $140.02 $226.47 $349.20 Total Amount for Levy Submission $1,446.60 $64.14 $76.38 $140.02 $226.47 $349.20 Total City Subsidy $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 5 1 2 3 3 12
Total Benefit Units 5 1 2 3 3 12
Calculated Annual Assessment Rate per Benefit Unit $289.32 $64.14 $38.19 $46.67 $75.49 $29.10 Maximum Assessment Rate per Benefit Unit $289.32 $72.21 $66.61 $154.72 $75.49 $29.10 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1081
3. Cost Estimate
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 28
Zone 128 Zone 129 Zone 130 Zone 131 Zone 132 Zone 133
LANDSCAPE MAINTENANCE
Interior Landscape Maintenance $0.00 $0.00 $24,256.42 $0.00 $0.00 $0.00 Perimeter Landscape Maintenance1 $6,081.49 $0.00 $28,057.54 $0.00 $0.00 $0.00 Subtotal Landscape Maintenance $6,081.49 $0.00 $52,313.96 $0.00 $0.00 $0.00
STREET LIGHT MAINTENANCE
Interior Street Light Maintenance $0.00 $0.00 $2,960.98 $373.35 $262.17 $74.67 Perimeter Street Light Maintenance1 $348.53 $321.11 $560.37 $115.84 $521.26 $0.00 Subtotal Street Light Maintenance $348.53 $321.11 $3,521.35 $489.19 $783.43 $74.67
EQUESTRIAN TRAIL MAINTENANCE
Interior Equestrian Trail Maintenance $0.00 $0.00 $4,562.09 $0.00 $0.00 $0.00 Perimeter Equestrian Trail Maintenance1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Equestrian Trail Maintenance $0.00 $0.00 $4,562.09 $0.00 $0.00 $0.00
PLANNED CAPITAL IMPROVEMENT EXPENDITURES
Landscape Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lighting Improvements CIP Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement Expenditures $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GENERAL BENEFIT EXPENSES
Landscape General Benefit - City Contribution1 $6,081.49 $0.00 $28,057.54 $0.00 $0.00 $0.00 Lighting General Benefit - City Contribution1 $348.53 $321.11 $560.37 $115.84 $521.26 $0.00 Equestrian General Benefit - City Contribution1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal General Benefit Expenses - Contributions $6,430.03 $321.11 $28,617.91 $115.84 $521.26 $0.00
OPERATIONAL RESERVES FUNDING
Operation Reserves Collection $0.00 $0.13 $0.00 $114.30 $79.56 $17.33 Operational Reserve Contribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CAPITAL IMPROVEMENT FUNDING
Capital Improvement Reserves Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Capital Improvement and Reserve Funding $0.00 $0.13 $0.00 $114.30 $79.56 $17.33
ADMINISTRATION
Total Annual District Administration $1,313.79 $65.61 $12,340.44 $99.95 $160.07 $15.26 Subtotal Administrative Cost $1,313.79 $65.61 $12,340.44 $99.95 $160.07 $15.26 Total Cost Amount $7,743.81 $386.85 $72,737.85 $703.44 $1,023.06 $107.26 Total Amount for Levy Submission $5,143.53 $386.85 $26,893.10 $703.44 $1,023.06 $107.26 Total City Subsidy $2,600.28 $0.00 $45,844.75 $0.00 $0.00 $0.00
DISTRICT
Total Parcels 147 15 65 19 3 3
Total Benefit Units 147 15 65 19 3 3
Calculated Annual Assessment Rate per Benefit Unit $34.99 $25.79 $413.74 $37.02 $341.02 $35.75 Maximum Assessment Rate per Benefit Unit $34.99 $25.79 $413.74 $39.46 $341.02 $40.42 1 Amount is 50% of Calculated Cost
Budget Item
LLMD 83-2
1082
4. Assessment Roll
City of Chino Landscape and Street Lighting Districts 75-1, 75-2, 76-1, 76-2, and 83-2 Engineer’s Report for Fiscal Year 2025-2026 29
The boundaries of Landscape and Street Light Maintenance Districts No. 75-1, 75-2, 76-1, 76-2, and 83-2 coincide with the boundaries of the parcels included within the Districts as of the time of the adoption of the Resolution of Intention and the Initiation of these proceedings.
Reference is made to the County Assessor's Roll and Maps for a detailed description of the lines and dimensions of any lot or parcel. The lines and dimensions of each lot shall conform to those shown on the County Assessor's Maps for the Fiscal Year to which the "Report" applies.
Please refer to Appendix A for the Fiscal Year 2025-2026 Assessment Roll. 1083
APPENDIX A
Fiscal Year 2025-2026 Assessment Roll
1084
APN Levy Amount APN Levy Amount
CC08SP01 - LMD 75-1
CITY OF CHINO LMD 75
Fiscal Year 2025-26 Assessment Roll
1020142010000 $51.27
1020142020000 $51.27
1020142030000 $51.27
1020142040000 $51.27
1020142050000 $51.27
1020142060000 $51.27
1020142070000 $51.27
1020142080000 $51.27
1020142090000 $51.27
1020142100000 $51.27
1020142110000 $51.27
1020142120000 $51.27
1020142130000 $51.27
1020145790000 $51.27
1020145800000 $51.27
1020145810000 $51.27
1020145820000 $51.27
1020145830000 $51.27
1020145840000 $51.27
1020145850000 $51.27
1020145860000 $51.27
1020145870000 $51.27
1020145880000 $51.27
1020145890000 $51.27
1020145900000 $51.27
1020151560000 $51.27
1020151570000 $51.27
1020151580000 $51.27
1020154010000 $51.27
1020154020000 $51.27
1020154030000 $51.27
1020154040000 $51.27
32 $1,640.64
City of Chino - LMD 75 Page 1 of 3 1085
APN Levy Amount APN Levy Amount
CC08SP02 - LMD 75-2
CITY OF CHINO LMD 75
Fiscal Year 2025-26 Assessment Roll
1019361030000 $94.82
1019361040000 $94.82
1019361050000 $94.82
1019361060000 $94.82
1019361070000 $94.82
1019361080000 $94.82
1019362010000 $94.82
1019362020000 $94.82
1019362030000 $94.82
1019362040000 $94.82
1019362050000 $94.82
1019362060000 $94.82
1019362070000 $94.82
1019362080000 $94.82
1019362090000 $94.82
1019362100000 $94.82
1019362110000 $94.82
1019362120000 $94.82
1019362130000 $94.82
1019362140000 $94.82
1019363100000 $94.82
1019363110000 $94.82
1019363120000 $94.82
1019363130000 $94.82
1019363140000 $94.82
1019363150000 $94.82
1019363160000 $94.82
1019371040000 $94.82
1019371050000 $94.82
1019371060000 $94.82
1019371070000 $94.82
1019371080000 $94.82
1019371090000 $94.82
1019371100000 $94.82
1019371110000 $94.82
1019371120000 $94.82
1019371130000 $94.82
1019371140000 $94.82
1019371150000 $94.82
1019371160000 $94.82
1019371170000 $94.82
41 $3,887.62
City of Chino - LMD 75 Page 2 of 3 1086
APN Levy Amount APN Levy Amount
CC08SP02 - LMD 75-2
CITY OF CHINO LMD 75
Fiscal Year 2025-26 Assessment Roll
73 $5,528.26
Parcel Count Levy Amount
City of Chino - LMD 75 Page 3 of 3 1087
APN Levy Amount APN Levy Amount
CC08SP03 - LMD 76-1
CITY OF CHINO LMD 76
Fiscal Year 2025-26 Assessment Roll
1015161040000 $147.70
1015161050000 $147.70
1015161060000 $147.70
1015161070000 $147.70
1015161080000 $147.70
1015161090000 $147.70
1015161100000 $147.70
1015161110000 $147.70
1015161120000 $147.70
1015161130000 $147.70
1015161140000 $147.70
1015161150000 $147.70
1015161160000 $147.70
1015161170000 $147.70
1015161180000 $147.70
1015161190000 $147.70
1015161200000 $147.70
1015161210000 $147.70
1015161220000 $147.70
1015161230000 $147.70
1015161240000 $147.70
1015161250000 $147.70
1015161260000 $147.70
1015161270000 $147.70
1015161280000 $147.70
1015161290000 $147.70
1015161300000 $147.70
1015161310000 $147.70
1015161320000 $147.70
1015161330000 $147.70
1015161340000 $147.70
1015161350000 $147.70
1015161360000 $147.70
1015161370000 $147.70
1015161380000 $147.70
1015161390000 $147.70
1015161400000 $147.70
1015161410000 $147.70
38 $5,612.60
City of Chino - LMD 76 Page 1 of 4 1088
APN Levy Amount APN Levy Amount
CC08SP04 - LMD 76-2
CITY OF CHINO LMD 76
Fiscal Year 2025-26 Assessment Roll
1019361170000 $58.47
1019361180000 $58.47
1019361190000 $58.47
1019361200000 $58.47
1019361210000 $58.47
1019361220000 $58.47
1019361230000 $58.47
1019361240000 $58.47
1019361340000 $58.47
1019361350000 $58.47
1019361360000 $58.47
1019361370000 $58.47
1019361380000 $58.47
1019361390000 $58.47
1019363010000 $58.47
1019363020000 $58.47
1019363030000 $58.47
1019363040000 $58.47
1019363050000 $58.47
1019363060000 $58.47
1019363070000 $58.47
1019363080000 $58.47
1019363090000 $58.47
1019364010000 $58.47
1019364020000 $58.47
1019364030000 $58.47
1019364040000 $58.47
1019364050000 $58.47
1019364060000 $58.47
1019364070000 $58.47
1019364080000 $58.47
1019364090000 $58.47
1019364100000 $58.47
1019364110000 $58.47
1019364120000 $58.47
1019364130000 $58.47
1019364140000 $58.47
1019364150000 $58.47
1019364160000 $58.47
1019365010000 $58.47
1019365020000 $58.47
1019365030000 $58.47
1019365040000 $58.47
1019365050000 $58.47
1019365060000 $58.47
1019365070000 $58.47
1019365080000 $58.47
1019365090000 $58.47
1019365100000 $58.47
1019365110000 $58.47
1019365120000 $58.47
1019365130000 $58.47
1019365140000 $58.47
1019365150000 $58.47
1019365160000 $58.47
1019371190000 $58.47
1019371200000 $58.47
1019371210000 $58.47
1019371220000 $58.47
1019371230000 $58.47
1019371240000 $58.47
1019371250000 $58.47
1019371280000 $58.47
1019371290000 $58.47
1019371300000 $58.47
1019371310000 $58.47
1019371320000 $58.47
1019371330000 $58.47
1019371340000 $58.47
1019371350000 $58.47
1019371360000 $58.47
1019371370000 $58.47
1019371390000 $58.47
1019371400000 $58.47
1019371410000 $58.47
1019371420000 $58.47
1019371430000 $58.47
1019371440000 $58.47
1019371450000 $58.47
1019371460000 $58.47
1019371470000 $58.47
1019371480000 $58.47
1019371490000 $58.47
1019371500000 $58.47
1019371510000 $58.47
1019371520000 $58.47
1019371530000 $58.47
1019371540000 $58.47
1019371550000 $58.47
1019371560000 $58.47
1019371570000 $58.47
1019371580000 $58.47
1019371590000 $58.47
1019371600000 $58.47
1019371610000 $58.47
1019371620000 $58.47
City of Chino - LMD 76 Page 2 of 4 1089
APN Levy Amount APN Levy Amount
CC08SP04 - LMD 76-2
CITY OF CHINO LMD 76
Fiscal Year 2025-26 Assessment Roll
1019371630000 $58.47
1019371640000 $58.47
1019371650000 $58.47
1019371660000 $58.47
1019371670000 $58.47
1019371680000 $58.47
1019371690000 $58.47
1019371700000 $58.47
1019371710000 $58.47
1019371720000 $58.47
1019371730000 $58.47
1019371740000 $58.47
1019371750000 $58.47
1019371760000 $58.47
1019371770000 $58.47
1019371780000 $58.47
1019371790000 $58.47
1019371800000 $58.47
114 $6,665.58
City of Chino - LMD 76 Page 3 of 4 1090
APN Levy Amount APN Levy Amount
CC08SP04 - LMD 76-2
CITY OF CHINO LMD 76
Fiscal Year 2025-26 Assessment Roll
152 $12,278.18
Parcel Count Levy Amount
City of Chino - LMD 76 Page 4 of 4 1091
APN Levy Amount APN Levy Amount
CC08SP06 - LMD 83-2 A
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016052070000 $29.25
1016052080000 $29.25
1016052090000 $29.25
1016052100000 $29.25
1016052110000 $29.25
1016052120000 $29.25
1016052130000 $29.25
1016052140000 $29.25
1016052150000 $29.25
1016052160000 $29.25
1016052170000 $29.25
1016052180000 $29.25
1016052190000 $29.25
1016052200000 $29.25
1016052210000 $29.25
1016052220000 $29.25
1016052230000 $29.25
1016052240000 $29.25
1016052250000 $29.25
1016052260000 $29.25
1016052270000 $29.25
1016052280000 $29.25
1016052290000 $29.25
1016052300000 $29.25
1016052310000 $29.25
1016052320000 $29.25
1016052330000 $29.25
1016052340000 $29.25
1016052350000 $29.25
1016052360000 $29.25
1016052370000 $29.25
1016052380000 $29.25
1016052390000 $29.25
1016052400000 $29.25
1016052410000 $29.25
1016052420000 $29.25
1016052430000 $29.25
1016052440000 $29.25
1016052450000 $29.25
1016052460000 $29.25
1016052470000 $29.25
1016052480000 $29.25
1016052490000 $29.25
1016052500000 $29.25
1016052510000 $29.25
1016052520000 $29.25
1016052530000 $29.25
1016052540000 $29.25
1016052550000 $29.25
1016052560000 $29.25
50 $1,462.50
City of Chino - LMD 83-2 Page 1 of 132 1092
APN Levy Amount APN Levy Amount
CC08SP61 - LMD 83-2 B
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016341170000 $27.03
1016341180000 $27.03
1016341190000 $27.03
1016341200000 $27.03
1016341210000 $27.03
1016341220000 $27.03
1016341230000 $27.03
1016341240000 $27.03
1016341250000 $27.03
1016341260000 $27.03
1016341270000 $27.03
1016341280000 $27.03
1016341290000 $27.03
1016341300000 $27.03
1016341310000 $27.03
1016341320000 $27.03
1016341330000 $27.03
1016341340000 $27.03
1016341350000 $27.03
1016341360000 $27.03
1016341370000 $27.03
1016341380000 $27.03
1016341390000 $27.03
1016341400000 $27.03
1016341410000 $27.03
1016341420000 $27.03
1016341430000 $27.03
1016341440000 $27.03
1016341450000 $27.03
1016341460000 $27.03
1016341470000 $27.03
1016341480000 $27.03
1016341490000 $27.03
1016341500000 $27.03
1016341510000 $27.03
1016341520000 $27.03
1016341530000 $27.03
1016341540000 $27.03
1016341550000 $27.03
1016341560000 $27.03
1016341570000 $27.03
41 $1,108.23
City of Chino - LMD 83-2 Page 2 of 132 1093
APN Levy Amount APN Levy Amount
CC08SP62 - LMD 83-2 C
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1051451270000 $18.49
1051451280000 $18.49
1051451290000 $18.49
1051451300000 $18.49
1051451310000 $18.49
1051451320000 $18.49
1051451330000 $18.49
1051451340000 $18.49
1051451350000 $18.49
1051451360000 $18.49
1051451370000 $18.49
1051451380000 $18.49
1051451390000 $18.49
1051451400000 $18.49
1051451410000 $18.49
1051451420000 $18.49
1051451430000 $18.49
1051451440000 $18.49
1051451450000 $18.49
1051451460000 $18.49
1051451470000 $18.49
1051451480000 $18.49
1051451490000 $18.49
1051451500000 $18.49
1051451510000 $18.49
1051451520000 $18.49
1051451550000 $18.49
1051451560000 $18.49
1051451570000 $18.49
1051451580000 $18.49
1051451590000 $18.49
1051451600000 $18.49
1051451610000 $18.49
1051451620000 $18.49
1051451630000 $18.49
1051451640000 $18.49
1051451650000 $18.49
1051451660000 $18.49
1051451670000 $18.49
1051451680000 $18.49
1051451690000 $18.49
1051451700000 $18.49
1051451710000 $18.49
1051451720000 $18.49
1051451730000 $18.49
1051451740000 $18.49
1051451750000 $18.49
1051451760000 $18.49
1051451770000 $18.49
1051451780000 $18.49
1051451790000 $18.49
1051451800000 $18.49
1051451810000 $18.49
1051451820000 $18.49
1051451830000 $18.49
1051451840000 $18.49
1051451850000 $18.49
1051451860000 $18.49
1051451870000 $18.49
1051451880000 $18.49
1051451890000 $18.49
1051451900000 $18.49
1051452010000 $18.49
1051452020000 $18.49
1051452030000 $18.49
1051452040000 $18.49
1051452050000 $18.49
1051452060000 $18.49
1051452070000 $18.49
1051452080000 $18.49
1051452090000 $18.49
1051452100000 $18.49
1051452110000 $18.49
1051452120000 $18.49
1051452130000 $18.49
1051452140000 $18.49
1051452150000 $18.49
1051452160000 $18.49
1051452170000 $18.49
1051452180000 $18.49
1051452190000 $18.49
1051452200000 $18.49
1051452210000 $18.49
1051452220000 $18.49
1051452230000 $18.49
1051452250000 $18.49
1051452260000 $18.49
1051452270000 $18.49
1051452280000 $18.49
1051452290000 $18.49
1051452300000 $18.49
1051452310000 $18.49
1051452320000 $18.49
1051452330000 $18.49
1051452340000 $18.49
1051452350000 $18.49
City of Chino - LMD 83-2 Page 3 of 132 1094
APN Levy Amount APN Levy Amount
CC08SP62 - LMD 83-2 C
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1051452360000 $18.49
1051452370000 $18.49
1051452380000 $18.49
1051452390000 $18.49
1051452400000 $18.49
1051452410000 $18.49
1051452420000 $18.49
1051452430000 $18.49
1051452440000 $18.49
1051452450000 $18.49
1051452460000 $18.49
1051452470000 $18.49
1051452480000 $18.49
1051452490000 $18.49
1051452500000 $18.49
1051452510000 $18.49
1051452520000 $18.49
1051452530000 $18.49
1051452540000 $18.49
1051452550000 $18.49
1051452560000 $18.49
1051452570000 $18.49
1051452580000 $18.49
1051452590000 $18.49
1051461250000 $18.49
1051461260000 $18.49
1051461270000 $18.49
1051461280000 $18.49
1051461290000 $18.49
1051461300000 $18.49
1051461310000 $18.49
1051461320000 $18.49
1051461330000 $18.49
1051461340000 $18.49
1051461350000 $18.49
1051461360000 $18.49
1051461370000 $18.49
1051461380000 $18.49
1051461390000 $18.49
1051461400000 $18.49
1051461410000 $18.49
1051461420000 $18.49
1051461430000 $18.49
1051461440000 $18.49
1051461450000 $18.49
1051461460000 $18.49
1051461470000 $18.49
1051461480000 $18.49
1051461490000 $18.49
1051461500000 $18.49
1051461510000 $18.49
1051461520000 $18.49
1051461530000 $18.49
1051461540000 $18.49
1051461550000 $18.49
1051461560000 $18.49
1051461570000 $18.49
1051461580000 $18.49
1051461590000 $18.49
1051461600000 $18.49
1051461610000 $18.49
1051461620000 $18.49
1051461630000 $18.49
1051461640000 $18.49
1051461650000 $18.49
1051462010000 $18.49
1051462020000 $18.49
1051462030000 $18.49
1051462040000 $18.49
1051462050000 $18.49
1051462060000 $18.49
1051462070000 $18.49
1051462080000 $18.49
1051462090000 $18.49
1051462100000 $18.49
1051462110000 $18.49
1051462120000 $18.49
1051462130000 $18.49
1051462140000 $18.49
1051462150000 $18.49
1051462160000 $18.49
1051462170000 $18.49
1051462180000 $18.49
1051462190000 $18.49
1051462200000 $18.49
1051462210000 $18.49
1051462220000 $18.49
1051462230000 $18.49
1051462240000 $18.49
1051462250000 $18.49
1051462260000 $18.49
1051462270000 $18.49
1051462280000 $18.49
1051462290000 $18.49
1051462300000 $18.49
1051462310000 $18.49
City of Chino - LMD 83-2 Page 4 of 132 1095
APN Levy Amount APN Levy Amount
CC08SP62 - LMD 83-2 C
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1051462320000 $18.49
1051462330000 $18.49
1051462340000 $18.49
1051462350000 $18.49
1051462360000 $18.49
1051462370000 $18.49
1051501370000 $18.49
1051501380000 $18.49
1051501390000 $18.49
1051501400000 $18.49
1051501410000 $18.49
1051501420000 $18.49
1051501430000 $18.49
1051501440000 $18.49
1051501450000 $18.49
1051501460000 $18.49
1051501470000 $18.49
1051501480000 $18.49
1051501490000 $18.49
1051501500000 $18.49
1051501510000 $18.49
1051501520000 $18.49
1051501530000 $18.49
1051501540000 $18.49
1051501550000 $18.49
1051501560000 $18.49
1051501570000 $18.49
1051501580000 $18.49
1051501590000 $18.49
1051501600000 $18.49
1051501610000 $18.49
1051501620000 $18.49
1051501630000 $18.49
1051501640000 $18.49
1051501650000 $18.49
1051501660000 $18.49
1051501670000 $18.49
1051501680000 $18.49
1051501690000 $18.49
1051501700000 $18.49
1051501710000 $18.49
1051501720000 $18.49
1051501730000 $18.49
1051501740000 $18.49
1051501750000 $18.49
1051501760000 $18.49
1051501770000 $18.49
1051501780000 $18.49
240 $4,437.60
City of Chino - LMD 83-2 Page 5 of 132 1096
APN Levy Amount APN Levy Amount
CC08SP63 - LMD 83-2 D
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052021090000 $19.14
1052021100000 $19.14
1052021110000 $19.14
1052021120000 $19.14
1052021130000 $19.14
1052021140000 $19.14
1052021150000 $19.14
1052021160000 $19.14
1052021170000 $19.14
1052021180000 $19.14
1052021190000 $19.14
1052021200000 $19.14
1052021210000 $19.14
1052021220000 $19.14
1052021230000 $19.14
1052021240000 $19.14
1052021250000 $19.14
1052021260000 $19.14
1052021270000 $19.14
1052021280000 $19.14
1052021290000 $19.14
1052021300000 $19.14
1052021310000 $19.14
1052021320000 $19.14
1052021330000 $19.14
1052021340000 $19.14
1052021350000 $19.14
1052021360000 $19.14
1052021370000 $19.14
1052021380000 $19.14
1052021390000 $19.14
1052021400000 $19.14
1052021410000 $19.14
1052021420000 $19.14
1052021430000 $19.14
1052021440000 $19.14
1052021450000 $19.14
1052021460000 $19.14
1052021470000 $19.14
1052021480000 $19.14
1052021490000 $19.14
1052021500000 $19.14
1052021510000 $19.14
43 $823.02
City of Chino - LMD 83-2 Page 6 of 132 1097
APN Levy Amount APN Levy Amount
CC08SP64 - LMD 83-2 001
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020522010000 $58.77
1020522020000 $58.77
1020522030000 $58.77
1020522040000 $58.77
1020522050000 $58.77
1020522060000 $58.77
1020522070000 $58.77
1020522080000 $58.77
1020522090000 $58.77
1020522100000 $58.77
1020522110000 $58.77
1020522120000 $58.77
1020522130000 $58.77
1020522140000 $58.77
1020522150000 $58.77
1020522160000 $58.77
1020522170000 $58.77
1020522180000 $58.77
1020522190000 $58.77
1020522200000 $58.77
1020522210000 $58.77
1020522220000 $58.77
1020522230000 $58.77
1020522240000 $58.77
1020522250000 $58.77
1020522260000 $58.77
1020522270000 $58.77
1020522280000 $58.77
1020522290000 $58.77
1020522300000 $58.77
1020522310000 $58.77
1020522320000 $58.77
1020522330000 $58.77
1020522340000 $58.77
1020522350000 $58.77
1020522360000 $58.77
1020522370000 $58.77
1020522380000 $58.77
1020522390000 $58.77
1020522400000 $58.77
1020522410000 $58.77
1020522420000 $58.77
1020522430000 $58.77
1020522440000 $58.77
1020522450000 $58.77
1020522460000 $58.77
1020522470000 $58.77
1020522480000 $58.77
1020522490000 $58.77
1020522500000 $58.77
1020522510000 $58.77
1020522520000 $58.77
1020522530000 $58.77
1020522540000 $58.77
1020522550000 $58.77
1020522560000 $58.77
1020522570000 $58.77
1020522580000 $58.77
1020522590000 $58.77
1020522600000 $58.77
1020522610000 $58.77
1020522620000 $58.77
1020522630000 $58.77
1020522640000 $58.77
1020522650000 $58.77
1020522660000 $58.77
1020522670000 $58.77
1020522680000 $58.77
1020522690000 $58.77
1020522700000 $58.77
1020522710000 $58.77
1020522720000 $58.77
1020522730000 $58.77
1020522740000 $58.77
1020522750000 $58.77
1020522760000 $58.77
1020522770000 $58.77
1020522780000 $58.77
1020522790000 $58.77
1020522800000 $58.77
1020522810000 $58.77
1020522820000 $58.77
1020522830000 $58.77
83 $4,877.91
City of Chino - LMD 83-2 Page 7 of 132 1098
APN Levy Amount APN Levy Amount
CC08SP65 - LMD 83-2 002
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020501570000 $76.62
1020501580000 $76.62
1020501590000 $76.62
1020501600000 $76.62
1020501610000 $76.62
1020501620000 $76.62
1020501630000 $76.62
1020501640000 $76.62
1020501650000 $76.62
1020501660000 $76.62
1020501670000 $76.62
1020501680000 $76.62
1020501690000 $76.62
1020501700000 $76.62
1020501710000 $76.62
1020501720000 $76.62
1020501730000 $76.62
1020501740000 $76.62
1020501750000 $76.62
1020501760000 $76.62
1020501770000 $76.62
1020501780000 $76.62
1020501790000 $76.62
1020501800000 $76.62
1020501810000 $76.62
1020501820000 $76.62
1020501830000 $76.62
1020501840000 $76.62
1020501850000 $76.62
1020501860000 $76.62
1020501870000 $76.62
1020501880000 $76.62
1020501890000 $76.62
1020501900000 $76.62
1020501910000 $76.62
1020501920000 $76.62
1020501930000 $76.62
1020531400000 $76.62
1020531410000 $76.62
1020531420000 $76.62
1020531430000 $76.62
1020531440000 $76.62
1020531450000 $76.62
1020531460000 $76.62
1020531470000 $76.62
1020531480000 $76.62
1020531490000 $76.62
1020531500000 $76.62
1020531510000 $76.62
1020531520000 $76.62
1020531530000 $76.62
1020531540000 $76.62
1020531550000 $76.62
1020531560000 $76.62
1020531570000 $76.62
1020531580000 $76.62
1020531590000 $76.62
1020531600000 $76.62
1020531610000 $76.62
1020531620000 $76.62
1020531630000 $76.62
1020531640000 $76.62
1020531650000 $76.62
1020531660000 $76.62
1020531670000 $76.62
1020531680000 $76.62
1020531690000 $76.62
1020531700000 $76.62
1020531710000 $76.62
1020531720000 $76.62
1020531730000 $76.62
1020531740000 $76.62
1020531750000 $76.62
1020531760000 $76.62
1020531770000 $76.62
1020531780000 $76.62
1020531790000 $76.62
1020531800000 $76.62
1020531810000 $76.62
1020531820000 $76.62
1020531830000 $76.62
1020531840000 $76.62
1020531850000 $76.62
83 $6,359.46
City of Chino - LMD 83-2 Page 8 of 132 1099
APN Levy Amount APN Levy Amount
CC08SP66 - LMD 83-2 003
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020391120000 $19.00
1020391130000 $19.00
1020391140000 $19.00
1020391150000 $19.00
1020391160000 $19.00
1020391170000 $19.00
1020391180000 $19.00
1020391190000 $19.00
1020391200000 $19.00
1020391210000 $19.00
1020391220000 $19.00
1020391230000 $19.00
1020391240000 $19.00
1020391250000 $19.00
1020391260000 $19.00
1020391270000 $19.00
1020391280000 $19.00
1020391290000 $19.00
1020391300000 $19.00
1020391310000 $19.00
1020391320000 $19.00
1020391330000 $19.00
1020391340000 $19.00
1020391350000 $19.00
1020391360000 $19.00
1020391370000 $19.00
1020391380000 $19.00
1020391390000 $19.00
1020391400000 $19.00
1020391410000 $19.00
1020391420000 $19.00
1020391430000 $19.00
1020391440000 $19.00
1020391450000 $19.00
1020391460000 $19.00
1020391470000 $19.00
1020391480000 $19.00
1020391490000 $19.00
1020391500000 $19.00
1020391510000 $19.00
1020391520000 $19.00
1020391530000 $19.00
1020391540000 $19.00
1020391550000 $19.00
1020391560000 $19.00
1020391570000 $19.00
1020391580000 $19.00
1020391590000 $19.00
1020391600000 $19.00
1020391610000 $19.00
1020391620000 $19.00
1020391630000 $19.00
1020391640000 $19.00
1020391650000 $19.00
1020391660000 $19.00
1020391670000 $19.00
1020391680000 $19.00
1020391690000 $19.00
1020391700000 $19.00
1020391710000 $19.00
1020391720000 $19.00
1020391730000 $19.00
1020391740000 $19.00
1020391750000 $19.00
1020391760000 $19.00
1020391770000 $19.00
1020391780000 $19.00
1020391790000 $19.00
1020391800000 $19.00
1020391810000 $19.00
1020391820000 $19.00
1020391830000 $19.00
1020391840000 $19.00
1020391850000 $19.00
1020391860000 $19.00
75 $1,425.00
City of Chino - LMD 83-2 Page 9 of 132 1100
APN Levy Amount APN Levy Amount
CC08SP67 - LMD 83-2 004
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015421290000 $17.29
1015421300000 $17.29
1015421310000 $17.29
1015421320000 $17.29
1015421330000 $17.29
1015421340000 $17.29
1015421350000 $17.29
1015421360000 $17.29
1015421370000 $17.29
1015421380000 $17.29
1015421390000 $17.29
1015421400000 $17.29
1015421410000 $17.29
1015421420000 $17.29
1015421430000 $17.29
1015421440000 $17.29
1015421450000 $17.29
1015421460000 $17.29
1015421470000 $17.29
1015421480000 $17.29
1015421490000 $17.29
21 $363.09
City of Chino - LMD 83-2 Page 10 of 132 1101
APN Levy Amount APN Levy Amount
CC08SP68 - LMD 83-2 005
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052031250000 $16.23
1052031260000 $16.23
1052031270000 $16.23
1052031280000 $16.23
1052031290000 $16.23
1052031300000 $16.23
1052031310000 $16.23
1052031320000 $16.23
1052031330000 $16.23
1052031340000 $16.23
1052031350000 $16.23
1052031360000 $16.23
1052031370000 $16.23
1052031380000 $16.23
1052031390000 $16.23
1052031400000 $16.23
1052031410000 $16.23
1052031420000 $16.23
1052031430000 $16.23
1052031440000 $16.23
1052031450000 $16.23
21 $340.83
City of Chino - LMD 83-2 Page 11 of 132 1102
APN Levy Amount APN Levy Amount
CC08SP69 - LMD 83-2 006
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052031080000 $34.77
1052031090000 $34.77
1052031100000 $34.77
1052031110000 $34.77
1052031120000 $34.77
1052031130000 $34.77
1052031140000 $34.77
1052031150000 $34.77
1052031160000 $34.77
1052031170000 $34.77
1052031180000 $34.77
1052031190000 $34.77
1052031200000 $34.77
1052031210000 $34.77
1052031220000 $34.77
1052031460000 $34.77
1052031470000 $34.77
1052031480000 $34.77
1052031490000 $34.77
1052031500000 $34.77
1052031510000 $34.77
1052031520000 $34.77
1052031530000 $34.77
1052031540000 $34.77
1052031550000 $34.77
1052031560000 $34.77
1052031570000 $34.77
1052031580000 $34.77
1052031590000 $34.77
1052031600000 $34.77
1052031610000 $34.77
1052031620000 $34.77
1052031630000 $34.77
1052041060000 $34.77
1052041070000 $34.77
1052041080000 $34.77
1052041090000 $34.77
1052041100000 $34.77
1052041110000 $34.77
1052041120000 $34.77
1052041130000 $34.77
1052041140000 $34.77
1052041150000 $34.77
43 $1,495.11
City of Chino - LMD 83-2 Page 12 of 132 1103
APN Levy Amount APN Levy Amount
CC08SP70 - LMD 83-2 007
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020492010000 $27.10
1020492020000 $27.10
1020492030000 $27.10
1020492040000 $27.10
1020492050000 $27.10
1020492060000 $27.10
1020492070000 $27.10
1020492080000 $27.10
1020492090000 $27.10
1020492100000 $27.10
1020492110000 $27.10
1020492120000 $27.10
1020492130000 $27.10
1020492220000 $27.10
1020492230000 $27.10
1020492240000 $27.10
1020492250000 $27.10
1020492260000 $27.10
1020492270000 $27.10
1020492280000 $27.10
1020492290000 $27.10
1020492300000 $27.10
1020492310000 $27.10
1020492320000 $27.10
1020492330000 $27.10
1020492340000 $27.10
1020492350000 $27.10
1020492360000 $27.10
1020492370000 $27.10
1020492380000 $27.10
1020492390000 $27.10
1020492400000 $27.10
1020492410000 $27.10
1020492420000 $27.10
1020492430000 $27.10
1020492440000 $27.10
1020492450000 $27.10
1020492550000 $27.10
1020492560000 $27.10
1020492570000 $27.10
1020492580000 $27.10
1020492590000 $27.10
1020492600000 $27.10
1020492610000 $27.10
1020492620000 $27.10
45 $1,219.50
City of Chino - LMD 83-2 Page 13 of 132 1104
APN Levy Amount APN Levy Amount
CC08SP71 - LMD 83-2 008
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019533230000 $42.67
1019533240000 $42.67
1019533250000 $42.67
1019533260000 $42.67
1019533270000 $42.67
1019533280000 $42.67
1019533290000 $42.67
1019533300000 $42.67
1019533310000 $42.67
1019533320000 $42.67
1019533330000 $42.67
1019533340000 $42.67
1019533350000 $42.67
1019533360000 $42.67
1019533370000 $42.67
1019533380000 $42.67
1019533390000 $42.67
1019533400000 $42.67
1019533410000 $42.67
19 $810.73
City of Chino - LMD 83-2 Page 14 of 132 1105
APN Levy Amount APN Levy Amount
CC08SP72 - LMD 83-2 009
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019532020000 $42.67
1019532030000 $42.67
1019532040000 $42.67
1019532050000 $42.67
1019532060000 $42.67
1019532070000 $42.67
1019532080000 $42.67
1019532090000 $42.67
1019532100000 $42.67
1019532110000 $42.67
1019532120000 $42.67
1019532130000 $42.67
1019532140000 $42.67
1019532150000 $42.67
1019532160000 $42.67
1019532170000 $42.67
1019532180000 $42.67
1019532190000 $42.67
1019532200000 $42.67
19 $810.73
City of Chino - LMD 83-2 Page 15 of 132 1106
APN Levy Amount APN Levy Amount
CC08SP73 - LMD 83-2 011
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020491040000 $43.85
1020491050000 $43.85
1020491060000 $43.85
1020491070000 $43.85
1020491080000 $43.85
1020491090000 $43.85
1020491100000 $43.85
1020491110000 $43.85
1020491120000 $43.85
1020491130000 $43.85
1020491140000 $43.85
1020491150000 $43.85
1020491160000 $43.85
1020491170000 $43.85
1020491180000 $43.85
1020491190000 $43.85
1020491200000 $43.85
1020491210000 $43.85
1020491220000 $43.85
1020491230000 $43.85
1020491240000 $43.85
1020491250000 $43.85
1020491260000 $43.85
1020491270000 $43.85
1020491280000 $43.85
1020491290000 $43.85
1020491300000 $43.85
1020491310000 $43.85
1020491320000 $43.85
1020491330000 $43.85
1020491340000 $43.85
1020491350000 $43.85
1020491360000 $43.85
1020491370000 $43.85
1020491380000 $43.85
1020491390000 $43.85
1020491400000 $43.85
1020491410000 $43.85
1020491420000 $43.85
1020491430000 $43.85
1020491440000 $43.85
1020491450000 $43.85
1020491460000 $43.85
1020491470000 $43.85
1020491480000 $43.85
1020491490000 $43.85
1020491500000 $43.85
1020491510000 $43.85
1020491520000 $43.85
1020491530000 $43.85
1020491540000 $43.85
1020491550000 $43.85
1020491590000 $43.85
1020491600000 $43.85
1020491610000 $43.85
1020541040000 $43.85
1020541050000 $43.85
1020541060000 $43.85
1020541070000 $43.85
1020541080000 $43.85
1020541090000 $43.85
1020541100000 $43.85
1020541110000 $43.85
1020541120000 $43.85
1020541130000 $43.85
1020541140000 $43.85
1020541150000 $43.85
1020541160000 $43.85
1020541170000 $43.85
1020541180000 $43.85
1020541190000 $43.85
1020541200000 $43.85
1020541210000 $43.85
1020541220000 $43.85
1020541230000 $43.85
1020541240000 $43.85
1020541250000 $43.85
1020541260000 $43.85
1020541270000 $43.85
1020541280000 $43.85
1020541290000 $43.85
1020541300000 $43.85
1020541310000 $43.85
1020541320000 $43.85
1020541330000 $43.85
1020541340000 $43.85
1020541350000 $43.85
1020541360000 $43.85
1020541370000 $43.85
1020541380000 $43.85
1020541390000 $43.85
1020541400000 $43.85
1020541410000 $43.85
1020541420000 $43.85
1020541430000 $43.85
1020541440000 $43.85
City of Chino - LMD 83-2 Page 16 of 132 1107
APN Levy Amount APN Levy Amount
CC08SP73 - LMD 83-2 011
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
96 $4,209.60
City of Chino - LMD 83-2 Page 17 of 132 1108
APN Levy Amount APN Levy Amount
CC08SP74 - LMD 83-2 012
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052041180000 $53.22
1052041190000 $53.22
1052041200000 $53.22
1052041210000 $53.22
1052041220000 $53.22
1052041230000 $53.22
1052041240000 $53.22
1052041250000 $53.22
1052041260000 $53.22
1052041270000 $53.22
1052041280000 $53.22
1052041290000 $53.22
1052041300000 $53.22
1052041310000 $53.22
14 $745.08
City of Chino - LMD 83-2 Page 18 of 132 1109
APN Levy Amount APN Levy Amount
CC08SP75 - LMD 83-2 013
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052041320000 $23.05
1052041330000 $23.05
1052041340000 $23.05
1052041350000 $23.05
1052041360000 $23.05
1052041370000 $23.05
1052041380000 $23.05
1052041390000 $23.05
1052041400000 $23.05
1052041410000 $23.05
1052041420000 $23.05
1052041430000 $23.05
1052041440000 $23.05
1052041450000 $23.05
1052041460000 $23.05
1052041470000 $23.05
1052041480000 $23.05
1052041490000 $23.05
1052041500000 $23.05
1052041510000 $23.05
1052041520000 $23.05
1052041530000 $23.05
1052041540000 $23.05
1052041550000 $23.05
1052041560000 $23.05
1052041570000 $23.05
1052041580000 $23.05
1052041590000 $23.05
1052041600000 $23.05
1052041610000 $23.05
1052041620000 $23.05
31 $714.55
City of Chino - LMD 83-2 Page 19 of 132 1110
APN Levy Amount APN Levy Amount
CC08SP76 - LMD 83-2 014
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020481090000 $45.91
1020481100000 $45.91
1020481110000 $45.91
1020481120000 $45.91
1020481130000 $45.91
1020481140000 $45.91
1020481180000 $45.91
1020481190000 $45.91
1020481200000 $45.91
1020481210000 $45.91
1020481220000 $45.91
1020481230000 $45.91
1020481240000 $45.91
1020481250000 $45.91
1020481260000 $45.91
1020481270000 $45.91
1020481280000 $45.91
1020481290000 $45.91
1020481300000 $45.91
1020481310000 $45.91
1020481320000 $45.91
1020481330000 $45.91
1020481340000 $45.91
1020481350000 $45.91
1020481360000 $45.91
1020481370000 $45.91
1020481380000 $45.91
1020481390000 $45.91
1020481400000 $45.91
1020481410000 $45.91
1020481420000 $45.91
1020481430000 $45.91
1020481440000 $45.91
1020481450000 $45.91
1020481460000 $45.91
1020481470000 $45.91
1020481480000 $45.91
1020481490000 $45.91
1020481500000 $45.91
1020481510000 $45.91
1020481520000 $45.91
1020481530000 $45.91
1020481540000 $45.91
1020481550000 $45.91
1020481610000 $45.91
1020481620000 $45.91
1020481630000 $45.91
1020551060000 $45.91
1020551070000 $45.91
1020551080000 $45.91
1020551090000 $45.91
1020551100000 $45.91
1020551110000 $45.91
1020551120000 $45.91
1020551130000 $45.91
1020551140000 $45.91
1020551150000 $45.91
1020551160000 $45.91
1020551170000 $45.91
1020551180000 $45.91
1020551190000 $45.91
1020551200000 $45.91
1020551210000 $45.91
1020551220000 $45.91
1020551230000 $45.91
1020551240000 $45.91
1020551250000 $45.91
1020551260000 $45.91
1020551270000 $45.91
1020551280000 $45.91
1020551290000 $45.91
1020551300000 $45.91
1020551310000 $45.91
1020551320000 $45.91
1020551330000 $45.91
1020551340000 $45.91
1020551350000 $45.91
1020551360000 $45.91
1020551370000 $45.91
1020551380000 $45.91
1020551390000 $45.91
1020551400000 $45.91
1020551410000 $45.91
1020551420000 $45.91
1020551430000 $45.91
1020551440000 $45.91
1020551450000 $45.91
1020551460000 $45.91
1020551470000 $45.91
1020551480000 $45.91
1020551490000 $45.91
1020551500000 $45.91
1020551510000 $45.91
1020551520000 $45.91
1020551530000 $45.91
95 $4,361.45
City of Chino - LMD 83-2 Page 20 of 132 1111
APN Levy Amount APN Levy Amount
CC08SP77 - LMD 83-2 015
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020541450000 $66.91
1020541460000 $66.91
1020541470000 $66.91
1020541480000 $66.91
1020541490000 $66.91
1020541500000 $66.91
1020541510000 $66.91
1020541520000 $66.91
1020541530000 $66.91
1020541540000 $66.91
1020541550000 $66.91
1020541560000 $66.91
1020541570000 $66.91
1020541580000 $66.91
1020541590000 $66.91
1020541600000 $66.91
1020541610000 $66.91
1020541620000 $66.91
1020541630000 $66.91
1020541640000 $66.91
1020541650000 $66.91
1020541660000 $66.91
1020541670000 $66.91
1020541680000 $66.91
1020541690000 $66.91
1020541700000 $66.91
1020541710000 $66.91
1020541720000 $66.91
1020541730000 $66.91
1020541740000 $66.91
1020541750000 $66.91
1020541760000 $66.91
1020541770000 $66.91
1020541780000 $66.91
1020541790000 $66.91
1020541800000 $66.91
1020541810000 $66.91
1020541820000 $66.91
1020541830000 $66.91
1020541840000 $66.91
1020541850000 $66.91
1020541860000 $66.91
1020541870000 $66.91
1020541880000 $66.91
44 $2,944.04
City of Chino - LMD 83-2 Page 21 of 132 1112
APN Levy Amount APN Levy Amount
CC08SP78 - LMD 83-2 016
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020501040000 $19.18
1020501050000 $19.18
1020501060000 $19.18
1020501070000 $19.18
1020501080000 $19.18
1020501090000 $19.18
1020501100000 $19.18
1020501110000 $19.18
1020501120000 $19.18
1020501130000 $19.18
1020501140000 $19.18
1020501150000 $19.18
1020501160000 $19.18
1020501170000 $19.18
1020501210000 $19.18
1020501220000 $19.18
1020501230000 $19.18
1020501240000 $19.18
1020501250000 $19.18
1020501260000 $19.18
1020501270000 $19.18
1020501280000 $19.18
1020501290000 $19.18
1020501300000 $19.18
1020501310000 $19.18
1020501320000 $19.18
1020501330000 $19.18
1020501340000 $19.18
1020501350000 $19.18
1020501360000 $19.18
1020501370000 $19.18
1020501380000 $19.18
1020501390000 $19.18
1020501400000 $19.18
1020501410000 $19.18
1020501420000 $19.18
1020501430000 $19.18
1020501440000 $19.18
1020501450000 $19.18
1020501460000 $19.18
1020501470000 $19.18
1020501480000 $19.18
1020501490000 $19.18
1020501500000 $19.18
1020501510000 $19.18
1020501520000 $19.18
1020501530000 $19.18
1020501540000 $19.18
1020501550000 $19.18
1020501560000 $19.18
1020501940000 $19.18
1020501950000 $19.18
1020501960000 $19.18
1020501970000 $19.18
54 $1,035.72
City of Chino - LMD 83-2 Page 22 of 132 1113
APN Levy Amount APN Levy Amount
CC08SP79 - LMD 83-2 017
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020531060000 $47.76
1020531070000 $47.76
1020531080000 $47.76
1020531090000 $47.76
1020531100000 $47.76
1020531110000 $47.76
1020531120000 $47.76
1020531130000 $47.76
1020531140000 $47.76
1020531150000 $47.76
1020531160000 $47.76
1020531170000 $47.76
1020531180000 $47.76
1020531190000 $47.76
1020531200000 $47.76
1020531210000 $47.76
1020531220000 $47.76
1020531230000 $47.76
1020531250000 $47.76
1020531260000 $47.76
1020531270000 $47.76
1020531280000 $47.76
1020531290000 $47.76
1020531300000 $47.76
1020531310000 $47.76
1020531320000 $47.76
1020531330000 $47.76
1020531340000 $47.76
1020531350000 $47.76
1020531360000 $47.76
1020531370000 $47.76
1020531380000 $47.76
1020531390000 $47.76
1020531860000 $47.76
34 $1,623.84
City of Chino - LMD 83-2 Page 23 of 132 1114
APN Levy Amount APN Levy Amount
CC08SP80 - LMD 83-2 018
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020201190000 $48.05
1020201200000 $48.05
1020201210000 $48.05
1020201220000 $48.05
1020201230000 $48.05
1020201240000 $48.05
1020201250000 $48.05
1020201260000 $48.05
1020201270000 $48.05
1020201280000 $48.05
1020201290000 $48.05
1020201300000 $48.05
1020201310000 $48.05
1020201320000 $48.05
1020201330000 $48.05
1020201340000 $48.05
1020201350000 $48.05
1020201360000 $48.05
1020201370000 $48.05
19 $912.95
City of Chino - LMD 83-2 Page 24 of 132 1115
APN Levy Amount APN Levy Amount
CC08SP81 - LMD 83-2 019
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1014381110000 $43.21
1014381120000 $43.21
1014381130000 $43.21
1014381140000 $43.21
1014381150000 $43.21
1014381160000 $43.21
1014381170000 $43.21
1014381180000 $43.21
1014381190000 $43.21
1014381200000 $43.21
1014381210000 $43.21
1014381220000 $43.21
1014381230000 $43.21
1014381240000 $43.21
1014381250000 $43.21
1014381260000 $43.21
1014381270000 $43.21
1014381280000 $43.21
1014381290000 $43.21
1014381300000 $43.21
1014381310000 $43.21
1014381320000 $43.21
1014381330000 $43.21
1014381340000 $43.21
1014381350000 $43.21
1014381360000 $43.21
26 $1,123.46
City of Chino - LMD 83-2 Page 25 of 132 1116
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020511040000 $175.23
1020511050000 $175.23
1020511060000 $175.23
1020511070000 $175.23
1020511080000 $175.23
1020511090000 $175.23
1020511100000 $175.23
1020511110000 $175.23
1020511120000 $175.23
1020511130000 $175.23
1020511140000 $175.23
1020511150000 $175.23
1020511160000 $175.23
1020511170000 $175.23
1020511180000 $175.23
1020511190000 $175.23
1020511200000 $175.23
1020511210000 $175.23
1020511220000 $175.23
1020511230000 $175.23
1020521060000 $175.23
1020521070000 $175.23
1020521080000 $175.23
1020521090000 $175.23
1020521100000 $175.23
1020521110000 $175.23
1020521120000 $175.23
1020521130000 $175.23
1020521140000 $175.23
1020521150000 $175.23
1020521160000 $175.23
1020521170000 $175.23
1020521180000 $175.23
1020521190000 $175.23
1020521200000 $175.23
1020521210000 $175.23
1020521220000 $175.23
1021071030000 $175.23
1021071040000 $175.23
1021071050000 $175.23
1021071060000 $175.23
1021071070000 $175.23
1021071080000 $175.23
1021071090000 $175.23
1021071100000 $175.23
1021071110000 $175.23
1021071120000 $175.23
1021081030000 $175.23
1021081040000 $175.23
1021081050000 $175.23
1021081060000 $175.23
1021081070000 $175.23
1021081080000 $175.23
1021081090000 $175.23
1021081100000 $175.23
1021081110000 $175.23
1021081120000 $175.23
1021081130000 $175.23
1021081140000 $175.23
1021081150000 $175.23
1021081160000 $175.23
1021081170000 $175.23
1021081180000 $175.23
1021081190000 $175.23
1021081200000 $175.23
1021081210000 $175.23
1021081220000 $175.23
1021081230000 $175.23
1021081240000 $175.23
1021081250000 $175.23
1021081260000 $175.23
1021081270000 $175.23
1021081280000 $175.23
1021081290000 $175.23
1021081300000 $175.23
1021081310000 $175.23
1021081320000 $175.23
1021081330000 $175.23
1021081340000 $175.23
1021081350000 $175.23
1021081360000 $175.23
1021081370000 $175.23
1021081380000 $175.23
1021081390000 $175.23
1021081400000 $175.23
1021081410000 $175.23
1021081420000 $175.23
1021081430000 $175.23
1021081440000 $175.23
1021081450000 $175.23
1021081460000 $175.23
1021081470000 $175.23
1021081480000 $175.23
1021081490000 $175.23
1021081500000 $175.23
1021081510000 $175.23
City of Chino - LMD 83-2 Page 26 of 132 1117
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021081520000 $175.23
1021081530000 $175.23
1021081540000 $175.23
1021081550000 $175.23
1021081560000 $175.23
1021081570000 $175.23
1021081580000 $175.23
1021081590000 $175.23
1021081600000 $175.23
1021081610000 $175.23
1021081620000 $175.23
1021081630000 $175.23
1021081640000 $175.23
1021081650000 $175.23
1021081660000 $175.23
1021081670000 $175.23
1021081680000 $175.23
1021081690000 $175.23
1021081700000 $175.23
1021081710000 $175.23
1021081720000 $175.23
1021081730000 $175.23
1021081740000 $175.23
1021081750000 $175.23
1021081760000 $175.23
1021081770000 $175.23
1021081780000 $175.23
1021081790000 $175.23
1021081800000 $175.23
1021081810000 $175.23
1021081820000 $175.23
1021081830000 $175.23
1021091030000 $175.23
1021091040000 $175.23
1021091050000 $175.23
1021091060000 $175.23
1021091070000 $175.23
1021091080000 $175.23
1021091090000 $175.23
1021091100000 $175.23
1021091110000 $175.23
1021091120000 $175.23
1021091130000 $175.23
1021091140000 $175.23
1021091150000 $175.23
1021091160000 $175.23
1021091170000 $175.23
1021091180000 $175.23
1021091190000 $175.23
1021091200000 $175.23
1021091210000 $175.23
1021091220000 $175.23
1021091230000 $175.23
1021091240000 $175.23
1021091250000 $175.23
1021091260000 $175.23
1021091270000 $175.23
1021091280000 $175.23
1021091290000 $175.23
1021091300000 $175.23
1021091310000 $175.23
1021091320000 $175.23
1021091330000 $175.23
1021091340000 $175.23
1021091350000 $175.23
1021091360000 $175.23
1021091370000 $175.23
1021091380000 $175.23
1021091390000 $175.23
1021091400000 $175.23
1021091410000 $175.23
1021091420000 $175.23
1021091430000 $175.23
1021091440000 $175.23
1021091450000 $175.23
1021091460000 $175.23
1021091470000 $175.23
1021091480000 $175.23
1021091490000 $175.23
1021091500000 $175.23
1021091510000 $175.23
1021091520000 $175.23
1021091530000 $175.23
1021091540000 $175.23
1021091590000 $175.23
1021091600000 $175.23
1021091610000 $175.23
1021091620000 $175.23
1021091630000 $175.23
1021091640000 $175.23
1021091650000 $175.23
1021091660000 $175.23
1021091670000 $175.23
1021091680000 $175.23
1021091690000 $175.23
1021091700000 $175.23
City of Chino - LMD 83-2 Page 27 of 132 1118
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021091710000 $175.23
1021091720000 $175.23
1021091750000 $175.23
1021091760000 $175.23
1021091770000 $175.23
1021091780000 $175.23
1021091790000 $175.23
1021091820000 $175.23
1021091840000 $175.23
1021091850000 $175.23
1021091860000 $175.23
1021091870000 $175.23
1021091880000 $175.23
1021091890000 $175.23
1021091900000 $175.23
1021091910000 $175.23
1021091920000 $175.23
1021241040000 $175.23
1021241050000 $175.23
1021241060000 $175.23
1021241070000 $175.23
1021241080000 $175.23
1021241090000 $175.23
1021241100000 $175.23
1021241110000 $175.23
1021241120000 $175.23
1021241130000 $175.23
1021241140000 $175.23
1021241150000 $175.23
1021241160000 $175.23
1021241170000 $175.23
1021241180000 $175.23
1021241190000 $175.23
1021241200000 $175.23
1021241210000 $175.23
1021241230000 $175.23
1021241240000 $175.23
1021241250000 $175.23
1021241260000 $175.23
1021241270000 $175.23
1021241280000 $175.23
1021241290000 $175.23
1021241300000 $175.23
1021241310000 $175.23
1021241320000 $175.23
1021241330000 $175.23
1021241340000 $175.23
1021241350000 $175.23
1021241360000 $175.23
1021241370000 $175.23
1021241380000 $175.23
1021241390000 $175.23
1021241400000 $175.23
1021241410000 $175.23
1021241420000 $175.23
1021241430000 $175.23
1021241440000 $175.23
1021241450000 $175.23
1021251030000 $175.23
1021251040000 $175.23
1021251050000 $175.23
1021251060000 $175.23
1021251070000 $175.23
1021251080000 $175.23
1021251090000 $175.23
1021251100000 $175.23
1021251110000 $175.23
1021251120000 $175.23
1021251130000 $175.23
1021251140000 $175.23
1021251150000 $175.23
1021251180000 $175.23
1021251200000 $175.23
1021251210000 $175.23
1021251220000 $175.23
1021581230000 $175.23
1052291040000 $175.23
1052291050000 $175.23
1052291060000 $175.23
1052291070000 $175.23
1052291080000 $175.23
1052291090000 $175.23
1052291100000 $175.23
1052291110000 $175.23
1052291120000 $175.23
1052291130000 $175.23
1052291140000 $175.23
1052291150000 $175.23
1052291160000 $175.23
1052291170000 $175.23
1052291180000 $175.23
1052291190000 $175.23
1052291200000 $175.23
1052291210000 $175.23
1052291220000 $175.23
1052291230000 $175.23
City of Chino - LMD 83-2 Page 28 of 132 1119
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052291240000 $175.23
1052291250000 $175.23
1052291260000 $175.23
1052291270000 $175.23
1052291280000 $175.23
1052291290000 $175.23
1052291300000 $175.23
1052291310000 $175.23
1052291320000 $175.23
1052291330000 $175.23
1052291340000 $175.23
1052291350000 $175.23
1052291360000 $175.23
1052291370000 $175.23
1052291380000 $175.23
1052291390000 $175.23
1052291400000 $175.23
1052291410000 $175.23
1052291420000 $175.23
1052291430000 $175.23
1052291440000 $175.23
1052291450000 $175.23
1052291460000 $175.23
1052291470000 $175.23
1052291480000 $175.23
1052291490000 $175.23
1052291500000 $175.23
1052291510000 $175.23
1052291520000 $175.23
1052291530000 $175.23
1052291540000 $175.23
1052291550000 $175.23
1052291560000 $175.23
1052291570000 $175.23
1052291580000 $175.23
1052291590000 $175.23
1052291600000 $175.23
1052291610000 $175.23
1052291620000 $175.23
1052291630000 $175.23
1052291640000 $175.23
1052291650000 $175.23
1052291660000 $175.23
1052291670000 $175.23
1052291680000 $175.23
1052291690000 $175.23
1052291700000 $175.23
1052291710000 $175.23
1052291720000 $175.23
1052291730000 $175.23
1052291740000 $175.23
1052291750000 $175.23
1052301020000 $175.23
1052302010000 $175.23
1052302020000 $175.23
1052302030000 $175.23
1052302040000 $175.23
1052302050000 $175.23
1052302060000 $175.23
1052302070000 $175.23
1052302080000 $175.23
1052302090000 $175.23
1052302100000 $175.23
1052302110000 $175.23
1052302120000 $175.23
1052302130000 $175.23
1052302140000 $175.23
1052302150000 $175.23
1052302160000 $175.23
1052302170000 $175.23
1052302180000 $175.23
1052302190000 $175.23
1052302200000 $175.23
1052302210000 $175.23
1052302220000 $175.23
1052302230000 $175.23
1052302240000 $175.23
1052302250000 $175.23
1052302260000 $175.23
1052302270000 $175.23
1052302280000 $175.23
1052302290000 $175.23
1052302300000 $175.23
1052302310000 $175.23
1052302320000 $175.23
1052302330000 $175.23
1052302340000 $175.23
1052302350000 $175.23
1052302360000 $175.23
1052302370000 $175.23
1052302380000 $175.23
1052302390000 $175.23
1052302400000 $175.23
1052302410000 $175.23
1052302420000 $175.23
1052302430000 $175.23
City of Chino - LMD 83-2 Page 29 of 132 1120
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052302440000 $175.23
1052311040000 $175.23
1052311050000 $175.23
1052311060000 $175.23
1052311070000 $175.23
1052311080000 $175.23
1052311090000 $175.23
1052311100000 $175.23
1052311110000 $175.23
1052311120000 $175.23
1052311130000 $175.23
1052311140000 $175.23
1052311150000 $175.23
1052311160000 $175.23
1052311170000 $175.23
1052311180000 $175.23
1052311190000 $175.23
1052311200000 $175.23
1052311210000 $175.23
1052311220000 $175.23
1052311230000 $175.23
1052311240000 $175.23
1052311250000 $175.23
1052311260000 $175.23
1052311270000 $175.23
1052311280000 $175.23
1052311290000 $175.23
1052311300000 $175.23
1052311310000 $175.23
1052311320000 $175.23
1052311330000 $175.23
1052311340000 $175.23
1052311350000 $175.23
1052311360000 $175.23
1052311370000 $175.23
1052311380000 $175.23
1052311390000 $175.23
1052311400000 $175.23
1052311410000 $175.23
1052311420000 $175.23
1052311430000 $175.23
1052311440000 $175.23
1052311450000 $175.23
1052311460000 $175.23
1052311470000 $175.23
1052311480000 $175.23
1052311490000 $175.23
1052311500000 $175.23
1052311510000 $175.23
1052311520000 $175.23
1052311530000 $175.23
1052311540000 $175.23
1052311550000 $175.23
1052311560000 $175.23
1052311570000 $175.23
1052311580000 $175.23
1052311590000 $175.23
1052311600000 $175.23
1052311610000 $175.23
1052311620000 $175.23
1052311630000 $175.23
1052311640000 $175.23
1052311650000 $175.23
1052311660000 $175.23
1052311670000 $175.23
1052311680000 $175.23
1052311690000 $175.23
1052311700000 $175.23
1052311710000 $175.23
1052311720000 $175.23
1052311730000 $175.23
1052311740000 $175.23
1052311750000 $175.23
1052311760000 $175.23
1052311770000 $175.23
1052311780000 $175.23
1052311790000 $175.23
1052311800000 $175.23
1052311810000 $175.23
1052311820000 $175.23
1052311830000 $175.23
1052311840000 $175.23
1052311850000 $175.23
1052311860000 $175.23
1052311870000 $175.23
1052311880000 $175.23
1052311890000 $175.23
1052311900000 $175.23
1052321030000 $175.23
1052321040000 $175.23
1052321050000 $175.23
1052321060000 $175.23
1052321070000 $175.23
1052321080000 $175.23
1052321090000 $175.23
1052321100000 $175.23
City of Chino - LMD 83-2 Page 30 of 132 1121
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052321110000 $175.23
1052321120000 $175.23
1052321130000 $175.23
1052321140000 $175.23
1052321150000 $175.23
1052321160000 $175.23
1052321170000 $175.23
1052321180000 $175.23
1052321190000 $175.23
1052321200000 $175.23
1052321210000 $175.23
1052321220000 $175.23
1052321230000 $175.23
1052321240000 $175.23
1052321250000 $175.23
1052321260000 $175.23
1052321270000 $175.23
1052321280000 $175.23
1052321290000 $175.23
1052321300000 $175.23
1052321310000 $175.23
1052321320000 $175.23
1052321330000 $175.23
1052321340000 $175.23
1052321350000 $175.23
1052321360000 $175.23
1052321370000 $175.23
1052321380000 $175.23
1052321390000 $175.23
1052321400000 $175.23
1052321410000 $175.23
1052321420000 $175.23
1052321430000 $175.23
1052321440000 $175.23
1052321450000 $175.23
1052321460000 $175.23
1052321470000 $175.23
1052321480000 $175.23
1052321490000 $175.23
1052321500000 $175.23
1052321510000 $175.23
1052321520000 $175.23
1052321530000 $175.23
1052321540000 $175.23
1052321550000 $175.23
1052321560000 $175.23
1052321570000 $175.23
1052321580000 $175.23
1052321590000 $175.23
1052321600000 $175.23
1052321610000 $175.23
1052321620000 $175.23
1052321630000 $175.23
1052321640000 $175.23
1052321650000 $175.23
1052321660000 $175.23
1052321670000 $175.23
1052321680000 $175.23
1052321690000 $175.23
1052321700000 $175.23
1052321710000 $175.23
1052321720000 $175.23
1052321730000 $175.23
1052351030000 $175.23
1052351040000 $175.23
1052351050000 $175.23
1052351060000 $175.23
1052351070000 $175.23
1052351080000 $175.23
1052351090000 $175.23
1052351100000 $175.23
1052351110000 $175.23
1052351120000 $175.23
1052351130000 $175.23
1052351140000 $175.23
1052351150000 $175.23
1052351160000 $175.23
1052351170000 $175.23
1052351180000 $175.23
1052351190000 $175.23
1052351200000 $175.23
1052351210000 $175.23
1052351220000 $175.23
1052351230000 $175.23
1052351240000 $175.23
1052351250000 $175.23
1052351260000 $175.23
1052351270000 $175.23
1052351280000 $175.23
1052351290000 $175.23
1052351300000 $175.23
1052351310000 $175.23
1052351320000 $175.23
1052351330000 $175.23
1052351340000 $175.23
1052351350000 $175.23
City of Chino - LMD 83-2 Page 31 of 132 1122
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052351360000 $175.23
1052351370000 $175.23
1052351380000 $175.23
1052351390000 $175.23
1052351400000 $175.23
1052351410000 $175.23
1052351430000 $175.23
1052351440000 $175.23
1052351450000 $175.23
1052351460000 $175.23
1052351470000 $175.23
1052351480000 $175.23
1052351490000 $175.23
1052351500000 $175.23
1052351510000 $175.23
1052351520000 $175.23
1052351530000 $175.23
1052351540000 $175.23
1052351550000 $175.23
1052351560000 $175.23
1052351570000 $175.23
1052351580000 $175.23
1052351590000 $175.23
1052351600000 $175.23
1052351610000 $175.23
1052351620000 $175.23
1052351630000 $175.23
1052351640000 $175.23
1052351650000 $175.23
1052351660000 $175.23
1052351670000 $175.23
1052351680000 $175.23
1052351690000 $175.23
1052351700000 $175.23
1052351710000 $175.23
1052351720000 $175.23
1052351730000 $175.23
1052351740000 $175.23
1052351750000 $175.23
1052351760000 $175.23
1052351770000 $175.23
1052351780000 $175.23
1052351790000 $175.23
1052351800000 $175.23
1052351810000 $175.23
1052351820000 $175.23
1052351830000 $175.23
1052601030000 $175.23
1052601040000 $175.23
1052601050000 $175.23
1052601060000 $175.23
1052601070000 $175.23
1052601080000 $175.23
1052601090000 $175.23
1052601100000 $175.23
1052601110000 $175.23
1052601120000 $175.23
1052601130000 $175.23
1052601140000 $175.23
1052601150000 $175.23
1052601160000 $175.23
1052601170000 $175.23
1052601180000 $175.23
1052601190000 $175.23
1052601200000 $175.23
1052601210000 $175.23
1052601220000 $175.23
1052601230000 $175.23
1052601240000 $175.23
1052601250000 $175.23
1052601260000 $175.23
1052601270000 $175.23
1052601280000 $175.23
1052601290000 $175.23
1052601300000 $175.23
1052601310000 $175.23
1052601320000 $175.23
1052601330000 $175.23
1052601340000 $175.23
1052601350000 $175.23
1052601360000 $175.23
1052601370000 $175.23
1052601380000 $175.23
1052601390000 $175.23
1052601400000 $175.23
1052601410000 $175.23
1052601420000 $175.23
1052621050000 $175.23
1052621060000 $175.23
1052621070000 $175.23
1052621080000 $175.23
1052621090000 $175.23
1052621100000 $175.23
1052621110000 $175.23
1052621120000 $175.23
1052621130000 $175.23
City of Chino - LMD 83-2 Page 32 of 132 1123
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052621140000 $175.23
1052621150000 $175.23
1052621160000 $175.23
1052621170000 $175.23
1052621180000 $175.23
1052621190000 $175.23
1052621200000 $175.23
1052621210000 $175.23
1052621220000 $175.23
1052621230000 $175.23
1052621240000 $175.23
1052621250000 $175.23
1052621260000 $175.23
1052621270000 $175.23
1052621280000 $175.23
1052621290000 $175.23
1052621300000 $175.23
1052621310000 $175.23
1052621320000 $175.23
1052621330000 $175.23
1052621340000 $175.23
1052621350000 $175.23
1052621360000 $175.23
1052621370000 $175.23
1052621380000 $175.23
1052621390000 $175.23
1052621400000 $175.23
1052621410000 $175.23
1052621420000 $175.23
1052621430000 $175.23
1052621440000 $175.23
1052621510000 $175.23
1052621520000 $175.23
1052621530000 $175.23
1052621540000 $175.23
1052621550000 $175.23
1052621560000 $175.23
1052621570000 $175.23
1052621580000 $175.23
1052621590000 $175.23
1052621600000 $175.23
1052621610000 $175.23
1052621620000 $175.23
1052621630000 $175.23
1052621640000 $175.23
1052621650000 $175.23
1052621660000 $175.23
1052621670000 $175.23
1052621680000 $175.23
1052621690000 $175.23
1052621700000 $175.23
1052621710000 $175.23
1052621720000 $175.23
1052621730000 $175.23
1052621740000 $175.23
1052621750000 $175.23
1052621760000 $175.23
1052621770000 $175.23
1052621780000 $175.23
1052621790000 $175.23
1052621800000 $175.23
1052621810000 $175.23
1052621820000 $175.23
1052621830000 $175.23
1052621840000 $175.23
1052621850000 $175.23
1052621860000 $175.23
1052621870000 $175.23
1052621880000 $175.23
1052621890000 $175.23
1052621900000 $175.23
1052621910000 $175.23
1052641070000 $175.23
1052641080000 $175.23
1052641090000 $175.23
1052641100000 $175.23
1052641150000 $175.23
1052641160000 $175.23
1052641170000 $175.23
1052641180000 $175.23
1052641190000 $175.23
1052641200000 $175.23
1052641210000 $175.23
1052641220000 $175.23
1052641230000 $175.23
1052641240000 $175.23
1052641250000 $175.23
1052641260000 $175.23
1052641270000 $175.23
1052641280000 $175.23
1052641290000 $175.23
1052641300000 $175.23
1052641310000 $175.23
1052641320000 $175.23
1052641330000 $175.23
1052641340000 $175.23
City of Chino - LMD 83-2 Page 33 of 132 1124
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052641350000 $175.23
1052641380000 $175.23
1052641390000 $175.23
1052641400000 $175.23
1052641410000 $175.23
1052641420000 $175.23
1052641430000 $175.23
1052641440000 $175.23
1052641450000 $175.23
1052641460000 $175.23
1052641470000 $175.23
1052641480000 $175.23
1052641490000 $175.23
1052641500000 $175.23
1052641510000 $175.23
1052641520000 $175.23
1052641530000 $175.23
1052641540000 $175.23
1052641550000 $175.23
1052641560000 $175.23
1052641570000 $175.23
1052641580000 $175.23
1052641590000 $175.23
1052641600000 $175.23
1052641610000 $175.23
1052641620000 $175.23
1052641630000 $175.23
1052641640000 $175.23
1052641650000 $175.23
1052641660000 $175.23
1052641670000 $175.23
1052641680000 $175.23
1052641690000 $175.23
1052641700000 $175.23
1052641710000 $175.23
1052641720000 $175.23
1052641750000 $175.23
1052641760000 $175.23
1052641770000 $175.23
1052641780000 $175.23
1052641790000 $175.23
1052641800000 $175.23
1052641810000 $175.23
1052641820000 $175.23
1052641830000 $175.23
1052641840000 $175.23
1052641850000 $175.23
1052641880000 $175.23
1052641900000 $175.23
1052641910000 $175.23
1053021040000 $175.23
1053021050000 $175.23
1053021080000 $175.23
1053021090000 $175.23
1053021100000 $175.23
1053021110000 $175.23
1053021120000 $175.23
1053021130000 $175.23
1053021140000 $175.23
1053021150000 $175.23
1053021160000 $175.23
1053021170000 $175.23
1053021180000 $175.23
1053021190000 $175.23
1053021200000 $175.23
1053021210000 $175.23
1053021220000 $175.23
1053021230000 $175.23
1053021240000 $175.23
1053021250000 $175.23
1053021260000 $175.23
1053021270000 $175.23
1053021280000 $175.23
1053021290000 $175.23
1053021300000 $175.23
1053021310000 $175.23
1053021320000 $175.23
1053021330000 $175.23
1053021340000 $175.23
1053021350000 $175.23
1053021360000 $175.23
1053021370000 $175.23
1053021380000 $175.23
1053021390000 $175.23
1053021400000 $175.23
1053021410000 $175.23
1053021420000 $175.23
1053021430000 $175.23
1053021440000 $175.23
1053021450000 $175.23
1053021460000 $175.23
1053021470000 $175.23
1053021480000 $175.23
1053021490000 $175.23
1053021500000 $175.23
1053021510000 $175.23
City of Chino - LMD 83-2 Page 34 of 132 1125
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053021520000 $175.23
1053021530000 $175.23
1053021540000 $175.23
1053021550000 $175.23
1053021560000 $175.23
1053021570000 $175.23
1053021580000 $175.23
1053021590000 $175.23
1053021600000 $175.23
1053021610000 $175.23
1053021620000 $175.23
1053021630000 $175.23
1053021640000 $175.23
1053021650000 $175.23
1053021660000 $175.23
1053021670000 $175.23
1053021680000 $175.23
1053021690000 $175.23
1053021700000 $175.23
1053021710000 $175.23
1053021720000 $175.23
1053021730000 $175.23
1053021780000 $175.23
1053021790000 $175.23
1053021800000 $175.23
1053021810000 $175.23
1053021820000 $175.23
1053021830000 $175.23
1053021840000 $175.23
1053021850000 $175.23
1053021860000 $175.23
1053021870000 $175.23
1053021880000 $175.23
1053021890000 $175.23
1053021900000 $175.23
1053021910000 $175.23
1053021920000 $175.23
1053021930000 $175.23
1053031030000 $175.23
1053031040000 $175.23
1053031050000 $175.23
1053031060000 $175.23
1053031070000 $175.23
1053031080000 $175.23
1053031090000 $175.23
1053031100000 $175.23
1053031110000 $175.23
1053031120000 $175.23
1053031130000 $175.23
1053031140000 $175.23
1053031150000 $175.23
1053031160000 $175.23
1053031170000 $175.23
1053031180000 $175.23
1053031190000 $175.23
1053031200000 $175.23
1053031210000 $175.23
1053031220000 $175.23
1053031280000 $175.23
1053031290000 $175.23
1053031300000 $175.23
1053031310000 $175.23
1053031320000 $175.23
1053031330000 $175.23
1053031340000 $175.23
1053031350000 $175.23
1053031360000 $175.23
1053031370000 $175.23
1053031380000 $175.23
1053031390000 $175.23
1053031400000 $175.23
1053031410000 $175.23
1053031420000 $175.23
1053031430000 $175.23
1053031440000 $175.23
1053031450000 $175.23
1053031460000 $175.23
1053031470000 $175.23
1053031480000 $175.23
1053031490000 $175.23
1053031500000 $175.23
1053031510000 $175.23
1053031520000 $175.23
1053031530000 $175.23
1053031540000 $175.23
1053031550000 $175.23
1053031560000 $175.23
1053031570000 $175.23
1053031580000 $175.23
1053031590000 $175.23
1053031600000 $175.23
1053031610000 $175.23
1053031620000 $175.23
1053031630000 $175.23
1053031640000 $175.23
1053031650000 $175.23
City of Chino - LMD 83-2 Page 35 of 132 1126
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053031660000 $175.23
1053031670000 $175.23
1053031680000 $175.23
1053031690000 $175.23
1053031700000 $175.23
1053031710000 $175.23
1053031720000 $175.23
1053031730000 $175.23
1053031740000 $175.23
1053031750000 $175.23
1053031760000 $175.23
1053031770000 $175.23
1053031780000 $175.23
1053031790000 $175.23
1053031800000 $175.23
1053031810000 $175.23
1053031820000 $175.23
1053031830000 $175.23
1053031840000 $175.23
1053031850000 $175.23
1053031860000 $175.23
1053031870000 $175.23
1053031880000 $175.23
1053031890000 $175.23
1053031900000 $175.23
1053031910000 $175.23
1053031920000 $175.23
1053031930000 $175.23
1053031940000 $175.23
1053031950000 $175.23
1053031960000 $175.23
1053031970000 $175.23
1053031980000 $175.23
1053041060000 $175.23
1053041070000 $175.23
1053041080000 $175.23
1053041090000 $175.23
1053041100000 $175.23
1053041110000 $175.23
1053041120000 $175.23
1053041130000 $175.23
1053041140000 $175.23
1053041150000 $175.23
1053041160000 $175.23
1053041170000 $175.23
1053041180000 $175.23
1053041190000 $175.23
1053041200000 $175.23
1053041210000 $175.23
1053041220000 $175.23
1053041230000 $175.23
1053041240000 $175.23
1053041250000 $175.23
1053041260000 $175.23
1053041270000 $175.23
1053041280000 $175.23
1053041320000 $175.23
1053041330000 $175.23
1053041340000 $175.23
1053041350000 $175.23
1053041360000 $175.23
1053041370000 $175.23
1053041380000 $175.23
1053041390000 $175.23
1053041400000 $175.23
1053041410000 $175.23
1053041420000 $175.23
1053041430000 $175.23
1053041440000 $175.23
1053041450000 $175.23
1053041460000 $175.23
1053041470000 $175.23
1053041490000 $175.23
1053041500000 $175.23
1053041510000 $175.23
1053041520000 $175.23
1053041530000 $175.23
1053041540000 $175.23
1053041550000 $175.23
1053041560000 $175.23
1053041570000 $175.23
1053041580000 $175.23
1053041590000 $175.23
1053041600000 $175.23
1053041610000 $175.23
1053041620000 $175.23
1053041630000 $175.23
1053041640000 $175.23
1053041650000 $175.23
1053041660000 $175.23
1053041670000 $175.23
1053041680000 $175.23
1053041690000 $175.23
1053041700000 $175.23
1053041710000 $175.23
1053041720000 $175.23
City of Chino - LMD 83-2 Page 36 of 132 1127
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053041730000 $175.23
1053041740000 $175.23
1053041750000 $175.23
1053041760000 $175.23
1053041770000 $175.23
1053041780000 $175.23
1053041790000 $175.23
1053041800000 $175.23
1053041810000 $175.23
1053041820000 $175.23
1053041830000 $175.23
1053041840000 $175.23
1053041850000 $175.23
1053041860000 $175.23
1053041870000 $175.23
1053041880000 $175.23
1053231050000 $175.23
1053231060000 $175.23
1053231070000 $175.23
1053231080000 $175.23
1053231090000 $175.23
1053231100000 $175.23
1053231110000 $175.23
1053231120000 $175.23
1053231130000 $175.23
1053231140000 $175.23
1053231150000 $175.23
1053231160000 $175.23
1053231170000 $175.23
1053231180000 $175.23
1053231210000 $175.23
1053231220000 $175.23
1053231230000 $175.23
1053231240000 $175.23
1053231250000 $175.23
1053231260000 $175.23
1053231270000 $175.23
1053231280000 $175.23
1053231290000 $175.23
1053231300000 $175.23
1053231320000 $175.23
1053231330000 $175.23
1053241030000 $175.23
1053241040000 $175.23
1053241050000 $175.23
1053241060000 $175.23
1053241070000 $175.23
1053241080000 $175.23
1053241090000 $175.23
1053241100000 $175.23
1053241110000 $175.23
1053241120000 $175.23
1053241130000 $175.23
1053241140000 $175.23
1053241150000 $175.23
1053241160000 $175.23
1053241170000 $175.23
1053241180000 $175.23
1053241190000 $175.23
1053241200000 $175.23
1053241210000 $175.23
1053241220000 $175.23
1053241230000 $175.23
1053241240000 $175.23
1053241250000 $175.23
1053241260000 $175.23
1053241270000 $175.23
1053241280000 $175.23
1053241290000 $175.23
1053241300000 $175.23
1053241310000 $175.23
1053241320000 $175.23
1053241330000 $175.23
1053241340000 $175.23
1053241350000 $175.23
1053241360000 $175.23
1053241370000 $175.23
1053241380000 $175.23
1053241390000 $175.23
1053241400000 $175.23
1053241410000 $175.23
1053241420000 $175.23
1053241430000 $175.23
1053241440000 $175.23
1053241450000 $175.23
1053241460000 $175.23
1053241470000 $175.23
1053241480000 $175.23
1053241490000 $175.23
1053241500000 $175.23
1053241510000 $175.23
1053241520000 $175.23
1053241530000 $175.23
1053241540000 $175.23
1053241550000 $175.23
1053241560000 $175.23
City of Chino - LMD 83-2 Page 37 of 132 1128
APN Levy Amount APN Levy Amount
CC08SP82 - LMD 83-2 020
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053241570000 $175.23
1053241580000 $175.23
1053241590000 $175.23
1053241600000 $175.23
1053241610000 $175.23
1053241620000 $175.23
1053241630000 $175.23
1053241640000 $175.23
1053241650000 $175.23
1053241660000 $175.23
1053241670000 $175.23
1053261050000 $175.23
1053261060000 $175.23
1053261070000 $175.23
1053261080000 $175.23
1053261090000 $175.23
1053261100000 $175.23
1053261110000 $175.23
1053261120000 $175.23
1053261130000 $175.23
1053261140000 $175.23
1053261150000 $175.23
1053261160000 $175.23
1053261170000 $175.23
1053261180000 $175.23
1053261190000 $175.23
1053261200000 $175.23
1053261210000 $175.23
1053261220000 $175.23
1053261230000 $175.23
1053261240000 $175.23
1053261250000 $175.23
1053261260000 $175.23
1053261270000 $175.23
1053261280000 $175.23
1053261290000 $175.23
1053261300000 $175.23
1053261310000 $175.23
1053261320000 $175.23
1053261330000 $175.23
1053261340000 $175.23
1053261350000 $175.23
1053261360000 $175.23
1053261370000 $175.23
1053261380000 $175.23
1053261390000 $175.23
1053261400000 $175.23
1053261430000 $175.23
1053261440000 $175.23
1053261450000 $175.23
1053261460000 $175.23
1053261470000 $175.23
1053261480000 $175.23
1053261490000 $175.23
1053261500000 $175.23
1053261510000 $175.23
1053261520000 $175.23
1053261530000 $175.23
1053261540000 $175.23
1053261550000 $175.23
1053261560000 $175.23
1053261570000 $175.23
1053261580000 $175.23
1053261590000 $175.23
1053261600000 $175.23
1053261610000 $175.23
1053261620000 $175.23
1053261630000 $175.23
1053261640000 $175.23
1053261650000 $175.23
1053261660000 $175.23
1053261670000 $175.23
1053261680000 $175.23
1053261690000 $175.23
1053261700000 $175.23
1,227 $215,007.21
City of Chino - LMD 83-2 Page 38 of 132 1129
APN Levy Amount APN Levy Amount
CC08SP83 - LMD 83-2 022
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1014621290000 $22.64
1014621300000 $22.64
1014621310000 $22.64
1014621320000 $22.64
1014621330000 $22.64
1014621340000 $22.64
1014621350000 $22.64
1014621360000 $22.64
1014621370000 $22.64
1014621380000 $22.64
1014621390000 $22.64
1014621400000 $22.64
1014621410000 $22.64
1014621420000 $22.64
1014621430000 $22.64
1014621440000 $22.64
1014621450000 $22.64
1014621460000 $22.64
18 $407.52
City of Chino - LMD 83-2 Page 39 of 132 1130
APN Levy Amount APN Levy Amount
CC08SP84 - LMD 83-2 024
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1013361260000 $102.82
1013361270000 $102.82
1013361280000 $102.82
1013361290000 $102.82
1013361300000 $102.82
1013361310000 $102.82
1013361320000 $102.82
1013361330000 $102.82
1013361340000 $102.82
1013361350000 $102.82
1013361360000 $102.82
1013361370000 $102.82
1013361380000 $102.82
1013361390000 $102.82
1013361400000 $102.82
1013361410000 $102.82
1013361420000 $102.82
1013361430000 $102.82
1013361440000 $102.82
1013361450000 $102.82
20 $2,056.40
City of Chino - LMD 83-2 Page 40 of 132 1131
APN Levy Amount APN Levy Amount
CC08SP85 - LMD 83-2 025
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1028501010000 $41.68
1028501020000 $41.68
1028501030000 $41.68
1028501040000 $41.68
1028501100000 $41.68
1028501110000 $41.68
1028501260000 $41.68
1028501310000 $41.68
1028501320000 $41.68
1028501330000 $41.68
1028501340000 $41.68
1028501350000 $41.68
1028511010000 $41.68
1028511020000 $41.68
1028511030000 $41.68
1028511040000 $41.68
1028511050000 $41.68
1028511060000 $41.68
1028511070000 $41.68
1028511080000 $41.68
1028511210000 $41.68
1028511220000 $41.68
1028511230000 $41.68
23 $958.64
City of Chino - LMD 83-2 Page 41 of 132 1132
APN Levy Amount APN Levy Amount
CC08SP86 - LMD 83-2 026
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019451180000 $53.89
1 $53.89
City of Chino - LMD 83-2 Page 42 of 132 1133
APN Levy Amount APN Levy Amount
CC08SP87 - LMD 83-2 027
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020351200000 $16.66
1020351210000 $16.66
1020351220000 $16.66
1020351230000 $16.66
1020351240000 $16.66
1020351250000 $16.66
1020351260000 $16.66
1020351270000 $16.66
1020351280000 $16.66
1020351290000 $16.66
1020351300000 $16.66
1020351310000 $16.66
1020351320000 $16.66
1020351330000 $16.66
14 $233.24
City of Chino - LMD 83-2 Page 43 of 132 1134
APN Levy Amount APN Levy Amount
CC08SP88 - LMD 83-2 028
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021071140000 $240.86
1 $240.86
City of Chino - LMD 83-2 Page 44 of 132 1135
APN Levy Amount APN Levy Amount
CC08SP89 - LMD 83-2 029
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019481170000 $67.30
1019481180000 $67.30
1019481190000 $67.30
1019481200000 $67.30
1019481210000 $67.30
1019481220000 $67.30
1019481230000 $67.30
7 $471.10
City of Chino - LMD 83-2 Page 45 of 132 1136
APN Levy Amount APN Levy Amount
CC08SP90 - LMD 83-2 030
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1028491010000 $55.76
1028491020000 $55.76
1028491030000 $55.76
1028491040000 $55.76
1028491050000 $55.76
1028491060000 $55.76
1028491070000 $55.76
1028491080000 $55.76
8 $446.08
City of Chino - LMD 83-2 Page 46 of 132 1137
APN Levy Amount APN Levy Amount
CC08SP91 - LMD 83-2 031
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020561130000 $122.76
1020561140000 $122.76
2 $245.52
City of Chino - LMD 83-2 Page 47 of 132 1138
APN Levy Amount APN Levy Amount
CC08SP92 - LMD 83-2 032
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025111060000 $125.75
1025111070000 $125.75
1025111080000 $125.75
3 $377.25
City of Chino - LMD 83-2 Page 48 of 132 1139
APN Levy Amount APN Levy Amount
CC08SP93 - LMD 83-2 033
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022471040000 $642.15
1 $642.15
City of Chino - LMD 83-2 Page 49 of 132 1140
APN Levy Amount APN Levy Amount
CC08SP94 - LMD 83-2 034
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021361410000 $105.47
1021361420000 $105.47
1021361430000 $105.47
1021361440000 $105.47
4 $421.88
City of Chino - LMD 83-2 Page 50 of 132 1141
APN Levy Amount APN Levy Amount
CC08SP95 - LMD 83-2 036
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016301210000 $136.86
1016311190000 $136.86
2 $273.72
City of Chino - LMD 83-2 Page 51 of 132 1142
APN Levy Amount APN Levy Amount
CC08SP96 - LMD 83-2 037
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021021230000 $97.00
1021021240000 $97.00
1021021250000 $97.00
1021021260000 $97.00
1021021270000 $97.00
5 $485.00
City of Chino - LMD 83-2 Page 52 of 132 1143
APN Levy Amount APN Levy Amount
CC08SP97 - LMD 83-2 038
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022441090000 $378.20
1 $378.20
City of Chino - LMD 83-2 Page 53 of 132 1144
APN Levy Amount APN Levy Amount
CC08SP98 - LMD 83-2 039
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016191060000 $40.39
1016191070000 $40.39
1016191080000 $40.39
1016191090000 $40.39
1016191100000 $40.39
1016191110000 $40.39
1016191120000 $40.39
1016191130000 $40.39
1016191140000 $40.39
1016191150000 $40.39
1016191160000 $40.39
1016191170000 $40.39
1016191180000 $40.39
1016191190000 $40.39
1016191200000 $40.39
1016191210000 $40.39
1016191220000 $40.39
1016191230000 $40.39
1016191240000 $40.39
1016191250000 $40.39
1016191260000 $40.39
1016191270000 $40.39
1016191280000 $40.39
1016191290000 $40.39
1016191300000 $40.39
1016191310000 $40.39
1016191320000 $40.39
1016191330000 $40.39
1016191340000 $40.39
1016191350000 $40.39
1016191360000 $40.39
1016191370000 $40.39
1016191380000 $40.39
1016191390000 $40.39
1016191400000 $40.39
1016191410000 $40.39
1016191420000 $40.39
1016191430000 $40.39
1016191440000 $40.39
1016191450000 $40.39
1016191460000 $40.39
1016191470000 $40.39
1016191480000 $40.39
1016191490000 $40.39
1016191500000 $40.39
1016191510000 $40.39
1016191520000 $40.39
1016191530000 $40.39
1016191540000 $40.39
1016191550000 $40.39
1016191560000 $40.39
1016191570000 $40.39
1016191580000 $40.39
1016191590000 $40.39
1016191600000 $40.39
1016191610000 $40.39
1016191620000 $40.39
1016191630000 $40.39
1016191640000 $40.39
1016191650000 $40.39
1016191660000 $40.39
1016191670000 $40.39
1016191680000 $40.39
1016191690000 $40.39
1016191700000 $40.39
65 $2,625.35
City of Chino - LMD 83-2 Page 54 of 132 1145
APN Levy Amount APN Levy Amount
CC08SP99 - LMD 83-2 041
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019111270000 $67.83
1019111280000 $67.83
1019111290000 $67.83
1019111300000 $67.83
1019111310000 $67.83
1019111320000 $67.83
1019111330000 $67.83
1019111340000 $67.83
1019111350000 $67.83
1019111360000 $67.83
1019111370000 $67.83
1019111380000 $67.83
1019111390000 $67.83
1019111400000 $67.83
1019111410000 $67.83
1019111420000 $67.83
1019111430000 $67.83
1019111440000 $67.83
1019111450000 $67.83
1019111460000 $67.83
1019111470000 $67.83
1019111480000 $67.83
1019111490000 $67.83
1019111500000 $67.83
1019111510000 $67.83
1019111520000 $67.83
1019111530000 $67.83
1019111540000 $67.83
1019111550000 $67.83
1019111560000 $67.83
1019111570000 $67.83
1019111580000 $67.83
1019111590000 $67.83
1019111600000 $67.83
1019111610000 $67.83
1019111620000 $67.83
1019111630000 $67.83
1019111640000 $67.83
1019111650000 $67.83
1019111660000 $67.83
1019122010000 $67.83
1019122020000 $67.83
1019122030000 $67.83
1019122040000 $67.83
1019122050000 $67.83
1019122060000 $67.83
1019122070000 $67.83
1019122080000 $67.83
1019122090000 $67.83
1019122100000 $67.83
1019122110000 $67.83
1019122120000 $67.83
1019122130000 $67.83
1019122140000 $67.83
1019122150000 $67.83
1019122160000 $67.83
1019122170000 $67.83
1019122180000 $67.83
1019122190000 $67.83
1019122210000 $67.83
1019122220000 $67.83
1019122230000 $67.83
1019122240000 $67.83
1019122250000 $67.83
1019122260000 $67.83
1019122270000 $67.83
1019122280000 $67.83
1019122290000 $67.83
1019122300000 $67.83
1019122310000 $67.83
1019122320000 $67.83
1019122330000 $67.83
1019122340000 $67.83
1019122350000 $67.83
1019122360000 $67.83
1019122400000 $67.83
1019122410000 $67.83
1019122420000 $67.83
1019122430000 $67.83
1019122440000 $67.83
1019122450000 $67.83
1019122460000 $67.83
1019123010000 $67.83
1019123020000 $67.83
1019123030000 $67.83
1019123040000 $67.83
1019123050000 $67.83
1019123060000 $67.83
1019123070000 $67.83
1019123080000 $67.83
1019123090000 $67.83
1019123100000 $67.83
1019123110000 $67.83
1019123120000 $67.83
1019123130000 $67.83
1019123140000 $67.83
City of Chino - LMD 83-2 Page 55 of 132 1146
APN Levy Amount APN Levy Amount
CC08SP99 - LMD 83-2 041
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019123150000 $67.83
1019123160000 $67.83
1019123170000 $67.83
1019123180000 $67.83
1019123190000 $67.83
1019123200000 $67.83
1019123210000 $67.83
1019123220000 $67.83
1019123230000 $67.83
1019123240000 $67.83
1019123250000 $67.83
1019123260000 $67.83
1019123270000 $67.83
1019123280000 $67.83
1019123290000 $67.83
1019123300000 $67.83
1019123310000 $67.83
1019123320000 $67.83
1019123330000 $67.83
1019123340000 $67.83
1019123350000 $67.83
1019123360000 $67.83
1019123370000 $67.83
1019123380000 $67.83
1019123390000 $67.83
1019123400000 $67.83
1019123410000 $67.83
1019123420000 $67.83
1019123430000 $67.83
1019123440000 $67.83
1019123450000 $67.83
1019123460000 $67.83
128 $8,682.24
City of Chino - LMD 83-2 Page 56 of 132 1147
APN Levy Amount APN Levy Amount
CC08SL01 - LMD 83-2 042
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015511280000 $95.53
1015511290000 $95.53
2 $191.06
City of Chino - LMD 83-2 Page 57 of 132 1148
APN Levy Amount APN Levy Amount
CC08SL02 - LMD 83-2 043
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019531140000 $65.45
1019531150000 $65.45
2 $130.90
City of Chino - LMD 83-2 Page 58 of 132 1149
APN Levy Amount APN Levy Amount
CC08SL03 - LMD 83-2 045
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022451030000 $68.20
1022451060000 $68.20
1022451070000 $68.20
1022461040000 $68.20
1022461050000 $68.20
1022461090000 $68.20
6 $409.20
City of Chino - LMD 83-2 Page 59 of 132 1150
APN Levy Amount APN Levy Amount
CC08SL04 - LMD 83-2 046
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1014591160000 $294.63
1014591170000 $294.63
1014601190000 $294.63
1014601200000 $294.63
4 $1,178.52
City of Chino - LMD 83-2 Page 60 of 132 1151
APN Levy Amount APN Levy Amount
CC08SL05 - LMD 83-2 048
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016091120000 $28.28
1016091130000 $28.28
1016091140000 $28.28
1016091150000 $28.28
1016091160000 $28.28
1016091170000 $28.28
1016091180000 $28.28
1016091190000 $28.28
1016091200000 $28.28
1016091210000 $28.28
10 $282.80
City of Chino - LMD 83-2 Page 61 of 132 1152
APN Levy Amount APN Levy Amount
CC08SL06 - LMD 83-2 049
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020441010000 $233.68
1 $233.68
City of Chino - LMD 83-2 Page 62 of 132 1153
APN Levy Amount APN Levy Amount
CC08SL07 - LMD 83-2 050
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019461120000 $32.76
1019461130000 $32.76
1019461140000 $32.76
1019461150000 $32.76
1019461160000 $32.76
1019461170000 $32.76
1019461180000 $32.76
1019461190000 $32.76
1019461200000 $32.76
1019461210000 $32.76
1019461220000 $32.76
1019461230000 $32.76
1019461240000 $32.76
1019461250000 $32.76
1019461260000 $32.76
15 $491.40
City of Chino - LMD 83-2 Page 63 of 132 1154
APN Levy Amount APN Levy Amount
CC08SL08 - LMD 83-2 051
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016011120000 $54.56
1016011130000 $54.56
1016011140000 $54.56
3 $163.68
City of Chino - LMD 83-2 Page 64 of 132 1155
APN Levy Amount APN Levy Amount
CC08SL09 - LMD 83-2 052
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016592080000 $125.75
1016592090000 $125.75
1023051090000 $125.75
3 $377.25
City of Chino - LMD 83-2 Page 65 of 132 1156
APN Levy Amount APN Levy Amount
CC08SL10 - LMD 83-2 053
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021051020000 $21.21
1021051030000 $21.21
1021051040000 $21.21
1021051060000 $21.21
1021051100000 $21.21
1021051110000 $21.21
1021051120000 $21.21
1021051130000 $21.21
1021051140000 $21.21
1021051150000 $21.21
1021051160000 $21.21
1021051170000 $21.21
1021051180000 $21.21
1021051190000 $21.21
1021051200000 $21.21
1021051210000 $21.21
1021051220000 $21.21
1021051230000 $21.21
1021051260000 $21.21
1021051270000 $21.21
1021051280000 $21.21
21 $445.41
City of Chino - LMD 83-2 Page 66 of 132 1157
APN Levy Amount APN Levy Amount
CC08SL11 - LMD 83-2 054
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016421200000 $28.32
1016421210000 $28.32
1016421220000 $28.32
1016421230000 $28.32
1016421240000 $28.32
1016421250000 $28.32
1016421260000 $28.32
1016421270000 $28.32
1016421280000 $28.32
1016421290000 $28.32
1016421300000 $28.32
1016421310000 $28.32
1016421320000 $28.32
1016421330000 $28.32
1016421340000 $28.32
15 $424.80
City of Chino - LMD 83-2 Page 67 of 132 1158
APN Levy Amount APN Levy Amount
CC08SL12 - LMD 83-2 055
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020341080000 $81.84
1 $81.84
City of Chino - LMD 83-2 Page 68 of 132 1159
APN Levy Amount APN Levy Amount
CC08SL13 - LMD 83-2 057
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1014601090000 $55.07
1014601100000 $55.07
1014601110000 $55.07
1014601120000 $55.07
1014601130000 $55.07
1014601140000 $55.07
1014601150000 $55.07
1014601160000 $55.07
1014611720000 $55.07
1014611730000 $55.07
1014611740000 $55.07
1014611750000 $55.07
1014611780000 $55.07
1014611790000 $55.07
1014611800000 $55.07
15 $826.05
City of Chino - LMD 83-2 Page 69 of 132 1160
APN Levy Amount APN Levy Amount
CC08SL14 - LMD 83-2 059
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021111080000 $47.25
1021111090000 $47.25
1021111100000 $47.25
1021111110000 $47.25
1021111120000 $47.25
1021111130000 $47.25
1021111140000 $47.25
7 $330.75
City of Chino - LMD 83-2 Page 70 of 132 1161
APN Levy Amount APN Levy Amount
CC08SL15 - LMD 83-2 061
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015271100000 $153.29
1015281270000 $153.29
1015281280000 $153.29
3 $459.87
City of Chino - LMD 83-2 Page 71 of 132 1162
APN Levy Amount APN Levy Amount
CC08SL16 - LMD 83-2 062
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025211230000 $105.36
1025211260000 $105.36
1025211280000 $105.36
3 $316.08
City of Chino - LMD 83-2 Page 72 of 132 1163
APN Levy Amount APN Levy Amount
CC08SL17 - LMD 83-2 063
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015391470000 $223.47
1 $223.47
City of Chino - LMD 83-2 Page 73 of 132 1164
APN Levy Amount APN Levy Amount
CC08SL18 - LMD 83-2 064
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016443150000 $382.16
1016443160000 $382.16
1016443170000 $382.16
1016443180000 $382.16
4 $1,528.64
City of Chino - LMD 83-2 Page 74 of 132 1165
APN Levy Amount APN Levy Amount
CC08SL19 - LMD 83-2 065
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021032060000 $102.91
1 $102.91
City of Chino - LMD 83-2 Page 75 of 132 1166
APN Levy Amount APN Levy Amount
CC08SL20 - LMD 83-2 067
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020371200000 $119.95
1020371210000 $119.95
1020371220000 $119.95
1020371230000 $119.95
1020371240000 $119.95
1020371250000 $119.95
6 $719.70
City of Chino - LMD 83-2 Page 76 of 132 1167
APN Levy Amount APN Levy Amount
CC08SL21 - LMD 83-2 069
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1013351320000 $162.05
1013351330000 $162.05
1013351340000 $162.05
1013351350000 $162.05
1013351360000 $162.05
1013351370000 $162.05
1013351380000 $162.05
1013351390000 $162.05
8 $1,296.40
City of Chino - LMD 83-2 Page 77 of 132 1168
APN Levy Amount APN Levy Amount
CC08SL22 - LMD 83-2 070
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021231050000 $14.26
1021231060000 $14.26
1021231070000 $14.26
1021231080000 $14.26
1021231090000 $14.26
1021231100000 $14.26
1021231110000 $14.26
1021231120000 $14.26
1021231130000 $14.26
1021231140000 $14.26
1021231150000 $14.26
1021231160000 $14.26
12 $171.12
City of Chino - LMD 83-2 Page 78 of 132 1169
APN Levy Amount APN Levy Amount
CC08SL23 - LMD 83-2 074
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022031020000 $299.58
1022082030000 $299.58
1022082040000 $299.58
1022082070000 $299.58
1022082110000 $299.58
1022082120000 $299.58
1022082130000 $299.58
1022082150000 $299.58
1022082180000 $299.58
1022082190000 $299.58
1022082200000 $299.58
1022082210000 $299.58
1022082220000 $299.58
1022082230000 $299.58
1022251050000 $299.58
1022251060000 $299.58
1022251070000 $299.58
1022251080000 $299.58
1022251090000 $299.58
1022251100000 $299.58
1022251110000 $299.58
1022251120000 $299.58
1022251130000 $299.58
1022251140000 $299.58
1022251150000 $299.58
1022251160000 $299.58
1022261080000 $299.58
1022261090000 $299.58
1022271160000 $299.58
1022271170000 $299.58
1022271180000 $299.58
1022271190000 $299.58
1022271200000 $299.58
1022271210000 $299.58
1022381040000 $299.58
1022391150000 $299.58
1022391160000 $299.58
1022391170000 $299.58
1022391180000 $299.58
1022391190000 $299.58
1022391200000 $299.58
1022391210000 $299.58
1022401060000 $299.58
1022401070000 $299.58
1022571070000 $299.58
1022571080000 $299.58
1022571090000 $299.58
1022571100000 $299.58
1022581040000 $299.58
49 $14,679.42
City of Chino - LMD 83-2 Page 79 of 132 1170
APN Levy Amount APN Levy Amount
CC08SL24 - LMD 83-2 076
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016091220000 $200.95
1 $200.95
City of Chino - LMD 83-2 Page 80 of 132 1171
APN Levy Amount APN Levy Amount
CC08SL25 - LMD 83-2 078
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015324090000 $62.87
1015324100000 $62.87
2 $125.74
City of Chino - LMD 83-2 Page 81 of 132 1172
APN Levy Amount APN Levy Amount
CC08SL26 - LMD 83-2 079
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021101230000 $12.56
1021101240000 $12.56
1021101250000 $12.56
1021101260000 $12.56
1021101270000 $12.56
1021101280000 $12.56
1021101290000 $12.56
1021101300000 $12.56
1021101310000 $12.56
1021101320000 $12.56
1021101330000 $12.56
1021101340000 $12.56
1021101350000 $12.56
1021101360000 $12.56
1021101370000 $12.56
1021101380000 $12.56
16 $200.96
City of Chino - LMD 83-2 Page 82 of 132 1173
APN Levy Amount APN Levy Amount
CC08SL27 - LMD 83-2 080
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022101060000 $420.30
1022101100000 $420.30
1022101110000 $420.30
1022101120000 $420.30
1022101130000 $420.30
1022101140000 $420.30
1022101150000 $420.30
1022111060000 $420.30
1022111070000 $420.30
1022111080000 $420.30
1022111090000 $420.30
1022111120000 $420.30
1022111130000 $420.30
1022111140000 $420.30
1022111150000 $420.30
1022121120000 $420.30
1022231040000 $420.30
1022241050000 $420.30
1022241060000 $420.30
1022241070000 $420.30
1022411050000 $420.30
1022421090000 $420.30
1022421120000 $420.30
1022421130000 $420.30
1022421160000 $420.30
1022421170000 $420.30
1022421180000 $420.30
1022421200000 $420.30
1022421210000 $420.30
1022421220000 $420.30
1022421230000 $420.30
1022421240000 $420.30
1022431090000 $420.30
1022561020000 $420.30
34 $14,290.20
City of Chino - LMD 83-2 Page 83 of 132 1174
APN Levy Amount APN Levy Amount
CC08SL28 - LMD 83-2 082
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019601110000 $105.31
1019601120000 $105.31
1019601130000 $105.31
1019601140000 $105.31
1019601150000 $105.31
1019601160000 $105.31
1019601170000 $105.31
1019601180000 $105.31
1019601190000 $105.31
1019601200000 $105.31
1019601210000 $105.31
1019601220000 $105.31
1019601230000 $105.31
1019601240000 $105.31
1019601250000 $105.31
1019601260000 $105.31
1019601270000 $105.31
1019601280000 $105.31
1019601290000 $105.31
1019601300000 $105.31
1019601310000 $105.31
1019601320000 $105.31
1019601330000 $105.31
1019601340000 $105.31
1019601350000 $105.31
1019601360000 $105.31
1019601370000 $105.31
1019601380000 $105.31
1019601390000 $105.31
1019601400000 $105.31
1019601410000 $105.31
1019601420000 $105.31
1019601440000 $105.31
1019601460000 $105.31
1019601480000 $105.31
1019601500000 $105.31
1019601520000 $105.31
1019601540000 $105.31
38 $4,001.78
City of Chino - LMD 83-2 Page 84 of 132 1175
APN Levy Amount APN Levy Amount
CC08SL29 - LMD 83-2 086
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015382020000 $123.63
1015382030000 $123.63
2 $247.26
City of Chino - LMD 83-2 Page 85 of 132 1176
APN Levy Amount APN Levy Amount
CC08SL30 - LMD 83-2 087
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022141260000 $314.26
1022141270000 $314.26
2 $628.52
City of Chino - LMD 83-2 Page 86 of 132 1177
APN Levy Amount APN Levy Amount
CC08SL31 - LMD 83-2 088
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021111170000 $18.29
1021111180000 $18.29
1021111190000 $18.29
1021111200000 $18.29
1021111210000 $18.29
1021111220000 $18.29
1021111230000 $18.29
1021111240000 $18.29
8 $146.32
City of Chino - LMD 83-2 Page 87 of 132 1178
APN Levy Amount APN Levy Amount
CC08SL32 - LMD 83-2 089
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020511030000 $258.17
1 $258.17
City of Chino - LMD 83-2 Page 88 of 132 1179
APN Levy Amount APN Levy Amount
CC08SL33 - LMD 83-2 090
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025211160000 $165.68
1025211240000 $165.68
1025211290000 $165.68
3 $497.04
City of Chino - LMD 83-2 Page 89 of 132 1180
APN Levy Amount APN Levy Amount
CC08SL34 - LMD 83-2 091
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020571070000 $206.85
1 $206.85
City of Chino - LMD 83-2 Page 90 of 132 1181
APN Levy Amount APN Levy Amount
CC08SL35 - LMD 83-2 093
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020551540000 $61.85
1020551550000 $61.85
1020551560000 $61.85
1020551570000 $61.85
1020551580000 $61.85
5 $309.25
City of Chino - LMD 83-2 Page 91 of 132 1182
APN Levy Amount APN Levy Amount
CC08SL36 - LMD 83-2 094
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021031220000 $34.54
1021031250000 $34.54
2 $69.08
City of Chino - LMD 83-2 Page 92 of 132 1183
APN Levy Amount APN Levy Amount
CC08SL37 - LMD 83-2 095
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1014361050000 $70.68
1014361280000 $70.68
1014361290000 $70.68
1014621470000 $70.68
1014621480000 $70.68
1014621490000 $70.68
1014621500000 $70.68
1014621510000 $70.68
8 $565.44
City of Chino - LMD 83-2 Page 93 of 132 1184
APN Levy Amount APN Levy Amount
CC08SL38 - LMD 83-2 096
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021061050000 $108.73
1021061060000 $108.73
1021061070000 $108.73
3 $326.19
City of Chino - LMD 83-2 Page 94 of 132 1185
APN Levy Amount APN Levy Amount
CC08SL39 - LMD 83-2 097
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022521330000 $105.71
1022521340000 $105.71
2 $211.42
City of Chino - LMD 83-2 Page 95 of 132 1186
APN Levy Amount APN Levy Amount
CC08SL40 - LMD 83-2 098
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019201040000 $76.27
1019201050000 $76.27
1019201060000 $76.27
1019201070000 $76.27
1019201080000 $76.27
1019201090000 $76.27
1019201100000 $76.27
1019201110000 $76.27
1019201120000 $76.27
1019201130000 $76.27
1019201140000 $76.27
1019201150000 $76.27
1019201160000 $76.27
1019201170000 $76.27
1019201180000 $76.27
1019201190000 $76.27
1019201200000 $76.27
1019201210000 $76.27
1019201220000 $76.27
1019201230000 $76.27
1019201240000 $76.27
1019201250000 $76.27
1019201260000 $76.27
1019201270000 $76.27
1019201280000 $76.27
1019201290000 $76.27
1019201300000 $76.27
1019201310000 $76.27
1019201320000 $76.27
1019201330000 $76.27
1019201340000 $76.27
1019201350000 $76.27
1019201360000 $76.27
1019201370000 $76.27
1019201380000 $76.27
1019201390000 $76.27
1019201400000 $76.27
1019201410000 $76.27
1019201420000 $76.27
1019201430000 $76.27
1019201440000 $76.27
1019201450000 $76.27
1019201460000 $76.27
1019651010000 $76.27
1019651020000 $76.27
1019651030000 $76.27
1019651040000 $76.27
1019651050000 $76.27
1019651060000 $76.27
1019651070000 $76.27
1019651080000 $76.27
1019651090000 $76.27
1019651100000 $76.27
1019651110000 $76.27
1019651120000 $76.27
1019651130000 $76.27
1019651140000 $76.27
1019651150000 $76.27
1019651160000 $76.27
1019651170000 $76.27
1019651180000 $76.27
1019651190000 $76.27
1019651200000 $76.27
1019651210000 $76.27
1019651220000 $76.27
1019651230000 $76.27
1019651240000 $76.27
1019651250000 $76.27
1019651260000 $76.27
1019651270000 $76.27
1019651280000 $76.27
1019651290000 $76.27
1019651300000 $76.27
1019651310000 $76.27
1019651320000 $76.27
1019651330000 $76.27
1019651340000 $76.27
1019651350000 $76.27
1019651360000 $76.27
1019651370000 $76.27
1019651380000 $76.27
1019651390000 $76.27
1019651400000 $76.27
83 $6,330.41
City of Chino - LMD 83-2 Page 96 of 132 1187
APN Levy Amount APN Levy Amount
CC08SL41 - LMD 83-2 099
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021071150000 $103.91
1021071160000 $103.91
2 $207.82
City of Chino - LMD 83-2 Page 97 of 132 1188
APN Levy Amount APN Levy Amount
CC08SL42 - LMD 83-2 100
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022491050000 $129.97
1022501040000 $129.97
1022501050000 $129.97
1022501060000 $129.97
1022501070000 $129.97
1022501080000 $129.97
6 $779.82
City of Chino - LMD 83-2 Page 98 of 132 1189
APN Levy Amount APN Levy Amount
CC08SL43 - LMD 83-2 101
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1023051100000 $61.96
1 $61.96
City of Chino - LMD 83-2 Page 99 of 132 1190
APN Levy Amount APN Levy Amount
CC08SL44 - LMD 83-2 102
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019202010000 $129.40
1019202020000 $129.40
1019202030000 $129.40
1019202040000 $129.40
1019202050000 $129.40
1019202060000 $129.40
1019202070000 $129.40
1019202080000 $129.40
1019202090000 $129.40
1019202100000 $129.40
1019202110000 $129.40
1019202120000 $129.40
1019202130000 $129.40
1019202140000 $129.40
1019202150000 $129.40
1019202160000 $129.40
1019202170000 $129.40
1019202180000 $129.40
1019202190000 $129.40
1019202200000 $129.40
1019202210000 $129.40
1019202220000 $129.40
1019202230000 $129.40
1019202240000 $129.40
1019202250000 $129.40
1019202260000 $129.40
1019202270000 $129.40
1019202280000 $129.40
1019202290000 $129.40
1019202300000 $129.40
1019202310000 $129.40
1019202320000 $129.40
1019202330000 $129.40
1019202340000 $129.40
1019202350000 $129.40
1019202360000 $129.40
1019202370000 $129.40
1019202380000 $129.40
1019202390000 $129.40
1019652010000 $129.40
1019652020000 $129.40
1019652030000 $129.40
1019652040000 $129.40
1019652050000 $129.40
1019652060000 $129.40
1019652070000 $129.40
1019652080000 $129.40
1019652090000 $129.40
1019652100000 $129.40
1019652110000 $129.40
1019652120000 $129.40
1019652130000 $129.40
1019652140000 $129.40
1019652150000 $129.40
1019652160000 $129.40
1019652170000 $129.40
1019652180000 $129.40
1019652190000 $129.40
1019652200000 $129.40
1019652210000 $129.40
1019652220000 $129.40
1019652230000 $129.40
1019652240000 $129.40
1019652250000 $129.40
1019652260000 $129.40
1019652270000 $129.40
1019652280000 $129.40
1019652290000 $129.40
1019652300000 $129.40
1019652310000 $129.40
1019652320000 $129.40
1019652330000 $129.40
1019652340000 $129.40
1019652350000 $129.40
1019652360000 $129.40
1019652370000 $129.40
1019652380000 $129.40
1019652390000 $129.40
1019652400000 $129.40
1019652410000 $129.40
1019652420000 $129.40
1019652430000 $129.40
1019652440000 $129.40
1019652450000 $129.40
1019652460000 $129.40
1019652470000 $129.40
1019652480000 $129.40
1019652490000 $129.40
88 $11,387.20
City of Chino - LMD 83-2 Page 100 of 132 1191
APN Levy Amount APN Levy Amount
CC08SL45 - LMD 83-2 103
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053251210000 $332.60
1053251220000 $332.60
1053251230000 $332.60
1053251240000 $332.60
1053251250000 $332.60
1053251260000 $332.60
1053251270000 $332.60
1053251280000 $332.60
1053251290000 $332.60
1053251300000 $332.60
1053251310000 $332.60
1053251320000 $332.60
1053251330000 $332.60
1053251340000 $332.60
14 $4,656.40
City of Chino - LMD 83-2 Page 101 of 132 1192
APN Levy Amount APN Levy Amount
CC08SL46 - LMD 83-2 104
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021061020000 $154.72
1 $154.72
City of Chino - LMD 83-2 Page 102 of 132 1193
APN Levy Amount APN Levy Amount
CC08SL47 - LMD 83-2 105
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016381790000 $30.94
1016381800000 $30.94
1016381810000 $30.94
1016381820000 $30.94
1016381830000 $30.94
5 $154.70
City of Chino - LMD 83-2 Page 103 of 132 1194
APN Levy Amount APN Levy Amount
CC08SL48 - LMD 83-2 106
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025092020000 $82.17
1 $82.17
City of Chino - LMD 83-2 Page 104 of 132 1195
APN Levy Amount APN Levy Amount
CC08SL49 - LMD 83-2 107
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1022521350000 $107.27
1 $107.27
City of Chino - LMD 83-2 Page 105 of 132 1196
APN Levy Amount APN Levy Amount
CC08SL50 - LMD 83-2 108
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020281280000 $2,430.12
1020283270000 $2,430.12
1020283280000 $2,430.12
3 $7,290.36
City of Chino - LMD 83-2 Page 106 of 132 1197
APN Levy Amount APN Levy Amount
CC08SL51 - LMD 83-2 109
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021621030000 $238.62
1021621040000 $238.62
1021621050000 $238.62
1021621060000 $238.62
1021631010000 $238.62
1021631020000 $238.62
6 $1,431.72
City of Chino - LMD 83-2 Page 107 of 132 1198
APN Levy Amount APN Levy Amount
CC08SL52 - LMD 83-2 110
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1015342200000 $14.04
1015342210000 $14.04
1015342220000 $14.04
1015342230000 $14.04
4 $56.16
City of Chino - LMD 83-2 Page 108 of 132 1199
APN Levy Amount APN Levy Amount
CC08SL53 - LMD 83-2 111
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020571090000 $143.28
1020571100000 $143.28
1020571110000 $143.28
3 $429.84
City of Chino - LMD 83-2 Page 109 of 132 1200
APN Levy Amount APN Levy Amount
CC08SL54 - LMD 83-2 112
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052611030000 $199.82
1052611040000 $199.82
1052611050000 $199.82
1052611060000 $199.82
1052611070000 $199.82
1052611080000 $199.82
1052611090000 $199.82
1052611100000 $199.82
1052611110000 $199.82
1052611120000 $199.82
1052611130000 $199.82
1052611140000 $199.82
1052611150000 $199.82
1052611160000 $199.82
1052611170000 $199.82
1052611180000 $199.82
1052611190000 $199.82
1052611200000 $199.82
1052611210000 $199.82
1052611220000 $199.82
1052611230000 $199.82
1052611240000 $199.82
1052611250000 $199.82
1052611260000 $199.82
1052611270000 $199.82
1052611280000 $199.82
1052611290000 $199.82
1052611300000 $199.82
1052611310000 $199.82
1052611320000 $199.82
1052611330000 $199.82
1052611340000 $199.82
1052611350000 $199.82
1052611360000 $199.82
1052611370000 $199.82
1052611380000 $199.82
1052611390000 $199.82
1052611400000 $199.82
1052611410000 $199.82
1052611420000 $199.82
1052611430000 $199.82
1052611440000 $199.82
1052611450000 $199.82
1052611460000 $199.82
1052611470000 $199.82
1052611480000 $199.82
1052611490000 $199.82
1052611500000 $199.82
1052611510000 $199.82
1052611520000 $199.82
1052611530000 $199.82
1052611540000 $199.82
1052611550000 $199.82
1052611560000 $199.82
1052611570000 $199.82
1052611580000 $199.82
1052611590000 $199.82
1052611600000 $199.82
1052611610000 $199.82
1052611620000 $199.82
1052611630000 $199.82
61 $12,189.02
City of Chino - LMD 83-2 Page 110 of 132 1201
APN Levy Amount APN Levy Amount
CC08SL55 - LMD 83-2 113
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1052601430000 $229.24
1052601440000 $229.24
1052601450000 $229.24
1052601460000 $229.24
1052601470000 $229.24
1052601480000 $229.24
1052601490000 $229.24
1052601500000 $229.24
1052601510000 $229.24
1052601520000 $229.24
1052601530000 $229.24
1052601540000 $229.24
1052601550000 $229.24
1052601560000 $229.24
1052601570000 $229.24
1052601580000 $229.24
1052601590000 $229.24
1052601600000 $229.24
1052601610000 $229.24
1052601620000 $229.24
1052601630000 $229.24
1052601640000 $229.24
1052601650000 $229.24
1052601660000 $229.24
1052601670000 $229.24
1052601680000 $229.24
1052601690000 $229.24
1052601700000 $229.24
1052601710000 $229.24
1052601720000 $229.24
1052601730000 $229.24
1052601740000 $229.24
1052601750000 $229.24
1052611660000 $229.24
1052611670000 $229.24
1052611680000 $229.24
1052611690000 $229.24
1052611700000 $229.24
1052611710000 $229.24
1052611720000 $229.24
1052611730000 $229.24
1052611740000 $229.24
1052611750000 $229.24
1052611760000 $229.24
1052611770000 $229.24
1052611780000 $229.24
1052611790000 $229.24
1052611800000 $229.24
1052611810000 $229.24
1052611820000 $229.24
1052611830000 $229.24
1052611840000 $229.24
1052611850000 $229.24
1052611860000 $229.24
1052611870000 $229.24
1052611880000 $229.24
1052611890000 $229.24
1052611900000 $229.24
1052611910000 $229.24
1052611920000 $229.24
1052611930000 $229.24
61 $13,983.64
City of Chino - LMD 83-2 Page 111 of 132 1202
APN Levy Amount APN Levy Amount
CC08SL56 - LMD 83-2 114
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053631030000 $304.11
1053631040000 $304.11
1053631050000 $304.11
1053631060000 $304.11
1053631070000 $304.11
1053631080000 $304.11
1053631090000 $304.11
1053631100000 $304.11
1053631110000 $304.11
1053631120000 $304.11
1053631130000 $304.11
1053631140000 $304.11
1053631150000 $304.11
1053631160000 $304.11
1053631170000 $304.11
1053631180000 $304.11
1053631190000 $304.11
1053631200000 $304.11
1053631210000 $304.11
1053631220000 $304.11
1053631230000 $304.11
1053631240000 $304.11
1053631250000 $304.11
1053631260000 $304.11
1053631270000 $304.11
1053631280000 $304.11
1053631290000 $304.11
1053631300000 $304.11
1053631310000 $304.11
1053631320000 $304.11
1053631330000 $304.11
1053631340000 $304.11
1053631350000 $304.11
1053631360000 $304.11
1053641010000 $304.11
1053641020000 $304.11
1053641050000 $304.11
1053641060000 $304.11
1053641070000 $304.11
1053641080000 $304.11
1053641090000 $304.11
1053641100000 $304.11
1053641110000 $304.11
1053641120000 $304.11
1053641130000 $304.11
1053641140000 $304.11
1053641150000 $304.11
1053641160000 $304.11
1053641170000 $304.11
1053641180000 $304.11
1053641190000 $304.11
1053641200000 $304.11
1053641210000 $304.11
1053641220000 $304.11
1053641230000 $304.11
1053641240000 $304.11
1053641250000 $304.11
1053641260000 $304.11
1053641270000 $304.11
1053641280000 $304.11
1053641290000 $304.11
1053641300000 $304.11
1053641350000 $304.11
1053641360000 $304.11
64 $19,463.04
City of Chino - LMD 83-2 Page 112 of 132 1203
APN Levy Amount APN Levy Amount
CC08SL57 - LMD 83-2 115
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016081140000 $113.60
1016081150000 $113.60
1016081160000 $113.60
1016081170000 $113.60
1016081180000 $113.60
1016081190000 $113.60
1016081200000 $113.60
1016081210000 $113.60
1016081220000 $113.60
1016081230000 $113.60
1016081240000 $113.60
1016081250000 $113.60
1016081260000 $113.60
1016081270000 $113.60
1016081280000 $113.60
1016081290000 $113.60
1016081300000 $113.60
1016081310000 $113.60
1016081320000 $113.60
1016081330000 $113.60
1016081340000 $113.60
1016081350000 $113.60
1016081360000 $113.60
1016081370000 $113.60
1016081380000 $113.60
1016081390000 $113.60
1016081400000 $113.60
1016081410000 $113.60
1016081420000 $113.60
1016081430000 $113.60
1016081440000 $113.60
1016081450000 $113.60
1016081460000 $113.60
1016081470000 $113.60
1016081480000 $113.60
1016081490000 $113.60
1016081500000 $113.60
1016081510000 $113.60
38 $4,316.80
City of Chino - LMD 83-2 Page 113 of 132 1204
APN Levy Amount APN Levy Amount
CC08SL58 - LMD 83-2 117
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1028202210000 $82.89
1028202250000 $82.89
1028202290000 $82.89
1028202300000 $82.89
1028202310000 $82.89
1028202320000 $82.89
1028202330000 $82.89
1028202340000 $82.89
1028202350000 $82.89
1028202360000 $82.89
1028202370000 $82.89
1028202380000 $82.89
1028202400000 $82.89
1028202410000 $82.89
1028202420000 $82.89
1028202430000 $82.89
1028202440000 $82.89
1028202450000 $82.89
1028202460000 $82.89
1028202470000 $82.89
1028202500000 $82.89
1028202510000 $82.89
1028202520000 $82.89
1028202530000 $82.89
24 $1,989.36
City of Chino - LMD 83-2 Page 114 of 132 1205
APN Levy Amount APN Levy Amount
CC08SL59 - LMD 83-2 118
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016281110000 $154.72
1 $154.72
City of Chino - LMD 83-2 Page 115 of 132 1206
APN Levy Amount APN Levy Amount
CC08SL60 - LMD 83-2 119A
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020421220000 $8.11
1020421230000 $8.11
1020421240000 $8.11
1020421250000 $8.11
1020421260000 $8.11
1020421270000 $8.11
1020421280000 $8.11
1020421290000 $8.11
1020421300000 $8.11
1020421310000 $8.11
10 $81.10
City of Chino - LMD 83-2 Page 116 of 132 1207
APN Levy Amount APN Levy Amount
CC08SL61 - LMD 83-2 120
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016071510000 $128.23
1016081090000 $128.23
2 $256.46
City of Chino - LMD 83-2 Page 117 of 132 1208
APN Levy Amount APN Levy Amount
CC08SL62 - LMD 83-2 121
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020431140000 $248.40
1 $248.40
City of Chino - LMD 83-2 Page 118 of 132 1209
APN Levy Amount APN Levy Amount
CC08SL63 - LMD 83-2 122
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025151090000 $289.32
1025151100000 $289.32
1025151120000 $289.32
1025151140000 $289.32
1025151160000 $289.32
5 $1,446.60
City of Chino - LMD 83-2 Page 119 of 132 1210
APN Levy Amount APN Levy Amount
CC08SL64 - LMD 83-2 123
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021061080000 $64.14
1 $64.14
City of Chino - LMD 83-2 Page 120 of 132 1211
APN Levy Amount APN Levy Amount
CC08SL65 - LMD 83-2 124
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020441050000 $38.19
1020441060000 $38.19
2 $76.38
City of Chino - LMD 83-2 Page 121 of 132 1212
APN Levy Amount APN Levy Amount
CC08SL66 - LMD 83-2 125
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021121070000 $46.67
1021121100000 $46.67
1021121110000 $46.67
3 $140.01
City of Chino - LMD 83-2 Page 122 of 132 1213
APN Levy Amount APN Levy Amount
CC08SL67 - LMD 83-2 126
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021011220000 $75.49
1021011230000 $75.49
1021011240000 $75.49
3 $226.47
City of Chino - LMD 83-2 Page 123 of 132 1214
APN Levy Amount APN Levy Amount
CC08SL68 - LMD 83-2 127
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1020461260000 $29.10
1020461270000 $29.10
1020461280000 $29.10
1020461290000 $29.10
1020571120000 $29.10
1020571130000 $29.10
1020571140000 $29.10
1020571150000 $29.10
1020571160000 $29.10
1020571170000 $29.10
1020571180000 $29.10
1020571190000 $29.10
12 $349.20
City of Chino - LMD 83-2 Page 124 of 132 1215
APN Levy Amount APN Levy Amount
CC08SL69 - LMD 83-2 128
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1051503010000 $34.99
1051503020000 $34.99
1051503030000 $34.99
1051503040000 $34.99
1051503050000 $34.99
1051503060000 $34.99
1051503070000 $34.99
1051503080000 $34.99
1051503090000 $34.99
1051503100000 $34.99
1051503110000 $34.99
1051503120000 $34.99
1051503130000 $34.99
1051503140000 $34.99
1051503150000 $34.99
1051503160000 $34.99
1051503170000 $34.99
1051503180000 $34.99
1051503190000 $34.99
1051503200000 $34.99
1051503210000 $34.99
1051503220000 $34.99
1051503230000 $34.99
1051503240000 $34.99
1051503250000 $34.99
1051503260000 $34.99
1051503270000 $34.99
1051503280000 $34.99
1051503290000 $34.99
1051503300000 $34.99
1051503310000 $34.99
1051503320000 $34.99
1051503330000 $34.99
1051503340000 $34.99
1051503350000 $34.99
1051503360000 $34.99
1051503370000 $34.99
1051503380000 $34.99
1051503390000 $34.99
1051503400000 $34.99
1051503410000 $34.99
1051503420000 $34.99
1051503430000 $34.99
1051503440000 $34.99
1051503450000 $34.99
1051503460000 $34.99
1051503470000 $34.99
1051503480000 $34.99
1051503490000 $34.99
1051503500000 $34.99
1051503510000 $34.99
1051503520000 $34.99
1051503530000 $34.99
1051503540000 $34.99
1051503550000 $34.99
1051503560000 $34.99
1051503570000 $34.99
1051503580000 $34.99
1051503590000 $34.99
1051503600000 $34.99
1051632010000 $34.99
1051632020000 $34.99
1051632030000 $34.99
1051632040000 $34.99
1051632050000 $34.99
1051632060000 $34.99
1051632070000 $34.99
1051632080000 $34.99
1051632090000 $34.99
1051632100000 $34.99
1051632110000 $34.99
1051632120000 $34.99
1051632130000 $34.99
1051632140000 $34.99
1051632150000 $34.99
1051632160000 $34.99
1051632170000 $34.99
1051632180000 $34.99
1051632190000 $34.99
1051632200000 $34.99
1051632210000 $34.99
1051632220000 $34.99
1051632230000 $34.99
1051632240000 $34.99
1051632250000 $34.99
1051632260000 $34.99
1051632270000 $34.99
1051632280000 $34.99
1051632290000 $34.99
1051632300000 $34.99
1051632310000 $34.99
1051632320000 $34.99
1051632330000 $34.99
1051632340000 $34.99
1051632350000 $34.99
1051632360000 $34.99
City of Chino - LMD 83-2 Page 125 of 132 1216
APN Levy Amount APN Levy Amount
CC08SL69 - LMD 83-2 128
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1051632370000 $34.99
1051632380000 $34.99
1051632390000 $34.99
1051632400000 $34.99
1051632410000 $34.99
1051632420000 $34.99
1051632430000 $34.99
1051632440000 $34.99
1051632450000 $34.99
1051632460000 $34.99
1051632470000 $34.99
1051632480000 $34.99
1051632490000 $34.99
1051632500000 $34.99
1051632510000 $34.99
1051632520000 $34.99
1051632530000 $34.99
1051632540000 $34.99
1051632550000 $34.99
1051632560000 $34.99
1051632570000 $34.99
1051632580000 $34.99
1051632590000 $34.99
1051632600000 $34.99
1051632610000 $34.99
1051632620000 $34.99
1051632630000 $34.99
1051632640000 $34.99
1051632650000 $34.99
1051632660000 $34.99
1051632670000 $34.99
1051632680000 $34.99
1051632690000 $34.99
1051632700000 $34.99
1051632710000 $34.99
1051632720000 $34.99
1051632730000 $34.99
1051632740000 $34.99
1051632750000 $34.99
1051632760000 $34.99
1051632770000 $34.99
1051632780000 $34.99
1051632790000 $34.99
1051632800000 $34.99
1051632810000 $34.99
1051632820000 $34.99
1051632830000 $34.99
1051632840000 $34.99
1051632850000 $34.99
1051632860000 $34.99
1051632870000 $34.99
147 $5,143.53
City of Chino - LMD 83-2 Page 126 of 132 1217
APN Levy Amount APN Levy Amount
CC08SL70 - LMD 83-2 129
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1021501030000 $25.79
1021501040000 $25.79
1021501050000 $25.79
1021501060000 $25.79
1021501070000 $25.79
1021501080000 $25.79
1021501090000 $25.79
1021501100000 $25.79
1021501110000 $25.79
1021501120000 $25.79
1021501130000 $25.79
1021501140000 $25.79
1021501150000 $25.79
1021501160000 $25.79
1021501170000 $25.79
15 $386.85
City of Chino - LMD 83-2 Page 127 of 132 1218
APN Levy Amount APN Levy Amount
CC08SL71 - LMD 83-2 130
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1053451030000 $413.74
1053451040000 $413.74
1053451050000 $413.74
1053451060000 $413.74
1053451070000 $413.74
1053451080000 $413.74
1053451090000 $413.74
1053451100000 $413.74
1053451110000 $413.74
1053451120000 $413.74
1053451130000 $413.74
1053451140000 $413.74
1053451150000 $413.74
1053451160000 $413.74
1053451170000 $413.74
1053451180000 $413.74
1053451190000 $413.74
1053451200000 $413.74
1053451210000 $413.74
1053451220000 $413.74
1053451230000 $413.74
1053451240000 $413.74
1053451250000 $413.74
1053451260000 $413.74
1053451270000 $413.74
1053451280000 $413.74
1053451290000 $413.74
1053451300000 $413.74
1053451310000 $413.74
1053451320000 $413.74
1053451330000 $413.74
1053451340000 $413.74
1053451350000 $413.74
1053461040000 $413.74
1053461050000 $413.74
1053461060000 $413.74
1053461070000 $413.74
1053461080000 $413.74
1053461090000 $413.74
1053461100000 $413.74
1053461110000 $413.74
1053461120000 $413.74
1053461130000 $413.74
1053461140000 $413.74
1053461150000 $413.74
1053461160000 $413.74
1053461170000 $413.74
1053461180000 $413.74
1053461190000 $413.74
1053461200000 $413.74
1053461210000 $413.74
1053461220000 $413.74
1053461230000 $413.74
1053461240000 $413.74
1053461250000 $413.74
1053461260000 $413.74
1053461270000 $413.74
1053461280000 $413.74
1053461290000 $413.74
1053461300000 $413.74
1053461310000 $413.74
1053461320000 $413.74
1053461330000 $413.74
1053461340000 $413.74
1053461350000 $413.74
65 $26,893.10
City of Chino - LMD 83-2 Page 128 of 132 1219
APN Levy Amount APN Levy Amount
CC08SL72 - LMD 83-2 131
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1016201500000 $37.02
1016201510000 $37.02
1016201520000 $37.02
1016201530000 $37.02
1016201540000 $37.02
1016201550000 $37.02
1016201560000 $37.02
1016201570000 $37.02
1016201580000 $37.02
1016201590000 $37.02
1016201600000 $37.02
1016201610000 $37.02
1016201620000 $37.02
1016201630000 $37.02
1016201640000 $37.02
1016201650000 $37.02
1016201660000 $37.02
1016201670000 $37.02
1016201680000 $37.02
19 $703.38
City of Chino - LMD 83-2 Page 129 of 132 1220
APN Levy Amount APN Levy Amount
CC08SL73 - LMD 83-2 132
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1025151210000 $341.02
1025151220000 $341.02
1025151230000 $341.02
3 $1,023.06
City of Chino - LMD 83-2 Page 130 of 132 1221
APN Levy Amount APN Levy Amount
CC08SL74 - LMD 83-2 133
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
1019461300000 $35.75
1019461310000 $35.75
1019461320000 $35.75
3 $107.25
City of Chino - LMD 83-2 Page 131 of 132 1222
APN Levy Amount APN Levy Amount
CC08SL74 - LMD 83-2 133
CITY OF CHINO LMD 83-2
Fiscal Year 2025-26 Assessment Roll
3,804 $446,933.83
Parcel Count Levy Amount
City of Chino - LMD 83-2 Page 132 of 132 1223