It is considered best practice to review the budget on an ongoing basis in order to ensure the fiscal integrity of all City operations. The purpose of this report is to provide current summary information that will assist the City Council in the decision making process. This report includes projections to close the fiscal year for each City fund, as well as all recommended changes to the budget including previously approved Council actions through the date of this report as illustrated in the attached Actual and Projected Fund Balances Worksheet.
ISSUES/ANALYSIS
Staff began the mid-year process by first examining the prior fiscal year’s outcomes, then proceeding to evaluate revenue and expenditure performance in the first six months of current fiscal year, and finally staff has made certain assumptions about performance for the final six months of the fiscal year. Based on this analysis and an analysis of the potential economic impacts of further pandemic-related emergency orders, staff has conservatively estimated ending balances for fiscal year 2021-22.
GENERAL FUND
As of December 31, 2021, with 50% of the fiscal year complete, General Fund revenues are
38.0% received while expenditures are 52.5% spent (including encumbrances 58.8% spent).
Certain major General Fund revenues, such as property taxes, are primarily collected in the second, third and fourth quarters of the fiscal year and thus, at mid-year, will generally show less than 50% collected. Property tax in-lieu of VLF, which represents approximately 13% of estimated revenue, is collected in the third and fourth quarters, and thus has a significant lowering effect on the percentage received in the first half of the fiscal year. In addition, sales tax receipts through December reflect only four months collection due to the required accrual method of accounting.
REVENUES
Overall, based on current estimates, revenues are projected to increase by $4,838,013 over current budgeted revenues, which represents an increase of 10.7% over the current budget and
10.9% over the original budget projections, as illustrated in the table below. 3 Packet Pg. 235
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
$ %
PROPERTY TAXES 6,201,000 6,201,000 6,858,000 657,000 10.6% VLF - PROPERTY TAXES 5,750,000 5,750,000 6,438,000 688,000 12.0% SALES TAXES 10,600,000 10,600,000 13,673,000 3,073,000 29.0% FRANCHISE TAXES 1,760,543 1,760,543 1,760,543 - 0.0%
OTHER TAXES 1,650,000 1,650,000 1,959,000 309,000 18.7% LICENSES & PERMITS 2,080,960 2,080,960 1,925,460 (155,500) -7.5% INTERGOVERNMENTAL 1,165,935 1,441,281 1,406,281 (35,000) -2.4% CHARGES FOR SERVICES 2,196,083 2,196,083 2,514,376 318,293 14.5% USE OF MONEY AND PROPERTY 250,000 250,000 165,000 (85,000) -34.0% FINES AND FORFEITURES 241,000 241,000 271,100 30,100 12.5% GENERAL FUND TRANSFER 10,500,000 10,500,000 10,500,000 - 0.0% OTHER FINANCING SOURCES 1,822,153 2,343,286 2,381,406 38,120 1.6% TOTAL REVENUE 44,217,674 45,014,153 49,852,166 4,838,013 10.7% VARIANCE +/(-)
ESTIMATED GENERAL FUND REVENUES
FY 2021-22 MID-YEAR
ORIGINAL
BUDGET
CURRENT
BUDGET
ESTIMATED
TO CLOSE
The revenue increase is attributed to projected growth in many revenue categories but predominately in the sales taxes, property taxes, and property tax in lieu of VLF categories. The Fiscal Year 2021-22 budget was adopted before the final FY2020-21 sales tax receipts were known, so the City adopted a rather conservative sales tax budget given the projected impacts of the pandemic on the City’s unique sales tax base were still unknown. While stay-at-home orders negatively impacted some sales tax categories as anticipated, such as those from fuel and service stations, but other categories like RV and auto sales and building and construction soared unexpectedly. The composure of the City’s unique sales tax base, coupled with various federal and state assistance programs, resulted in growth in the City’s sales tax over pre-pandemic years.
The $3,073,000 increase in the sales tax category alone represents 63.5% of the revenue increases at mid-year. Additionally, the property tax category improved over the original adopted budget. The City of Colton topped San Bernardino County’s growth comparison chart with an 11.99% change in net taxable value over the prior fiscal year. Contributing factors to the increase in property tax revenue included several large commercial properties adding to the tax roll, including the new warehouse on S La Cadena Dr., the Pellissier Logistics Center, and the California University of Science and Medicine. Additionally, residential sales values for detached, single family residential homes continued to climb through the year, with average and median prices exceeding pre-pandemic levels.
General Fund Transfer
With the adoption of the FY2021-22 budget, the total GFT amount approved by City Council in accordance with Measure V was $10,500,000. The FY2021-22 mid-year budget proposes no change to the GFT. In accordance with the Flow of Funds Ordinance, the GFT is calculated using the prior years’ audited actual gross revenues less any restricted revenue, which was finalized with the presentation of the Annual Comprehensive Financial Report for the year ending June 30, 2021. Therefore, the recommended GFT represents a 17.5% transfer. 3 Packet Pg. 236
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
The GFT Oversight Committee functions in an advisory capacity to the City Council of the City of Colton. It makes recommendations regarding the GFT amount from the Electric Utility Fund to the City’s General Fund. The GFT Committee had a regular meeting scheduled on January 24, 2022 to consider its mid-year recommendations to the City Council. The Committee did not have a quorum for the meeting and, due to timing and noticing requirements, staff was unable to schedule another meeting prior to this City Council meeting. Staff made themselves available to answer questions and educate the Committee Members about the distributed agenda materials in advance of the City Council meeting to ensure Committee Members were able to understand the material. Committee Members were encouraged to reach out to their Council Members and submit their public recommendations on the item to City Council individually.
EXPENDITURES
With respect to expenditures, a majority of costs are relatively straight-line in nature, i.e., there is a proportionate share spent each month. However, there are some operating costs, as well as capital expenditures, that do not follow this pattern. Because of these timing issues, year-to-date expenditure percentages by Department may vary, while the overall budget to actual percentage is right in line with expectations. Overall, General Fund expenditures are estimated to increase by a net amount of $667,180 to close the fiscal year over the current adopted budget. After including the requested mid-year amendments and netting certain one-time items, the FY2021-22 projected General Fund expenditure estimate to close is illustrated as follows.
General Fund expenditures are projected to increase by a net of $667,180. The increase factors in the following:
A $288,842 increase in salaries and benefits based on the recommended mid-year authorized position list and newly adopted MOU implementation netted against salary savings for vacant positions through the first half of the fiscal year. A $150,000 increase in Police Department Overtime netted against a $75,000 savings in Part-time salaries for unfilled positions.
A $100,000 increase in reimbursable development agreements for development project environmental reviews.
A $52,000 increase in Parks Division overtime, which was offset by a $151,308 salary savings resulting from vacant positions through the first half of the year. A $40,000 increase in animal shelter services with Riverside County. A $39,500 increase in fuel across General Fund departments (Police, $27,000; Fire, $10,000; Public Works, $2,500).
A $28,638 increase in part-time salaries in Human Resources. A $23,200 increase in professional services in the Fire Department for grant consulting, ambulance JPA formation feasibility, and standards of response coverage report services. Additional requests include:, Inflationary increases for previously budgeted vehicle purchase, $13,500; Public notices requiring published noticing, $5,000; and other nominal increases/decreases to various line items totaling $1,500 across all departments. 3 Packet Pg. 237
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
The revenue and expenditure adjustments recommended herein are projected to result in the following fund balance outcome for the General Fund:
Total General Fund Balance as of June 30, 2021 $ 37,364,104 Pension Reserve Balance, June 30, 2021 19,820,872
OPEB Reserve Balance, June 30, 2021 7,793,103
Settlement Reserve Balance, June 30, 2021 1,300,000
Total Available General Fund Balance, June 30, 2021 $ 8,450,129 Projected Revenues for FY 2021-22 49,852,166
Projected Expenditures for FY 2021-22 51,291,896
FY 2020-21 Surplus/(Deficit) (1,439,730)
Estimated Fund Balance on June 30, 2022 $ 35,924,374
Available Fund Balance June 30, 2022 8,310,399
Pension Reserve Balance, June 30, 2022 19,820,872
OPEB Reserve Balance, June 30, 2022 7,793,103
These amendments result in a General Fund structural deficit of ($1,439,730), balanced with the use of reserves. The total General Fund reserve balance at June 30, 2022 is projected to be $35,924,374, of which $19,820,872 is committed for pension obligations and $7,793,103 is committed for OPEB obligations. The total available General Fund Reserve Balance at June 30, 2022 is estimated to be $8,310,399, or approximately 16.2% of proposed General Fund expenditures, meeting the City’s 15% reserve requirement.
Personnel Requests
Upon recommendation from the City Manager and the Finance Committee, included in the requested mid-year appropriations are the following personnel requests:
Add one (1) Part-time Administrative Assistant to replace one (1) Full-time Administrative Assistant in the City Manager’s Office.
Adjustment of the salary range for the Deputy City Clerk classification to reflect current market rate. This classification was found to be significantly out of market, despite recent negotiated MOU changes. This recommended adjustment will ensure the classification is paid at market.
Add one (1) Full-time Accountant for department support in grant management and accounting. The City is managing significantly more grants that it has in the past, making it more critical to support grant management and reimbursement requests for grant expenditures. This position will ensure the City can continue to obtain federal awards and manage grants within the framework of the Uniform Guidance for Federal Grants.
3 Packet Pg. 238
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
Add one (1) Full-time Office Specialist I/II in the Fire Department to assist with the Fire Prevention administrative duties and billing. This position is funded by the Fire Prevention revenues in the updated fee schedule adopted by City Council. Add one (1) Full-time Assistant Planner in the Development Services Department. This new classification will assist with employee retention and bridge the disparity in required minimum qualifications between the Planning/Building Technician I/II classification and the Associate Planner classification. Staff will return to City Council to adopt a salary schedule and job description after due diligence is complete. Reclassify one (1) Office Specialist I/II to an Administrative Analyst I/II in the Electric Division of the Public Works & Utility Services Department to better fit the operational needs of the utility and to address a working-out-of-class situation.
PROJECTED GENERAL FUND EXPENDITURES
FY2021-22 MID-YEAR
ORIGINAL CURRENT ESTIMATED VARIANCE +/(-)
BUDGET BUDGET TO CLOSE $ %
CITY COUNCIL 251,020 251,020 251,020 - 0%
CITY CLERK 349,233 355,872 363,386 7,514 2%
CITY MANAGER 598,334 598,334 625,579 27,245 5%
ECONOMIC DEVELOPMENT 552,702 682,747 691,294 8,547 1%
TOTAL CITY MANAGER 1,151,036 1,281,081 1,316,873 35,792 3% NON DEPARTMENTAL (7,389,054) (7,101,809) (7,101,809) - 0% HUMAN RESOURCES 2,396,964 2,546,964 2,535,474 (11,490) 0% CITY ATTORNEY 830,250 830,250 830,250 - 0%
CITY TREASURER 63,839 63,839 64,059 220 0%
FINANCE DEPARTMENT
ADMINISTRATION 1,407,566 1,499,416 1,560,807 61,391 4%
CUSTOMER SERVICE 1,553,870 1,562,270 1,593,089 30,819 2% PURCHASING 346,421 346,421 359,084 12,663 4%
TOTAL FINANCE DEPARTMENT 3,307,857 3,408,107 3,512,980 104,873 3%
POLICE DEPARTMENT
POLICE ADMINISTRATION 11,171,435 12,284,100 12,542,064 257,964 2% PATROL 6,960,784 6,960,784 6,976,695 15,911 0%
DETECTIVES 1,427,730 1,427,730 1,426,819 (911) 0%
CODE ENFORCEMENT 859,584 859,584 977,573 117,989 14%
TOTAL POLICE DEPARTMENT 20,419,533 21,532,198 21,923,151 390,953 2% ORIGINAL CURRENT ESTIMATEDORIGINAL VARINCE +/(-) CURREN BUDGET BUDGET TO CLOSE $ %
FIRE DEPARTMENT
OPERATIONS 12,934,680 13,923,002 13,941,590 18,588 0%
3 Packet Pg. 239
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
SAFETY 413,554 413,554 369,404 (44,150) -11%
WEED ABATEMENT PROGRAM 57,200 57,200 57,200 - 0%
DISASTER PREPAREDNESS 270,540 270,540 228,400 (42,140) -16% TRAINING TEAM 7,000 10,463 10,463 - 0%
TOTAL FIRE DEPARTMENT 13,682,974 14,674,758 14,607,056 (67,702) 0%
PUBLIC WORKS
ADMINISTRATION &
ENGINEERING
1,667,238 1,745,963 1,943,235 197,272 11%
STREETS MAINTENANCE 486,267 490,910 493,410 2,500 1%
PARKS MAINTENANCE 1,217,789 1,217,789 1,118,481 (99,308) -8% TOTAL PUBLIC WORKS 3,371,294 3,454,662 3,555,126 100,464 3%
COMMUNITY SERVICES
ADMINISTRATION 953,422 1,053,187 1,070,076 16,889 2%
RECREATION SERVICES 2,225,987 2,946,901 2,914,902 (31,999) -1% LIBRARY 522,379 522,379 531,308 8,929 2%
TOTAL COMMUNITY SERVICES 3,701,788 4,522,467 4,516,286 (6,181) 0%
DEVELOPMENT SERVICES
PLANNING 2,589,591 3,840,592 3,966,994 126,402 3%
BUILDING 881,984 964,715 951,050 (13,665) -1%
TOTAL DEVELOPMENT SERVICES 3,471,575 4,805,307 4,918,044 112,737 2% TOTAL EXPENDITURES 45,608,309 50,624,716 51,291,896 667,180 1.32%
ENTERPRISE FUNDS
The City’s major enterprise funds, namely Electric, Water and Wastewater, are all recommended for adjustment at mid-year based on current operations and capital improvement expectations through the end of the fiscal year. It should be noted that each of these operations met or exceeded projected operating results for the prior fiscal year.
Electric
The Electric Department is projecting overall revenues for fiscal year 2021-22 to decrease by $194,850 over the current adopted budget. Of the decreased revenues, $300,000 is attributed to a decrease in late charges and penalties and interest. Also expected to decrease over original projections were pooled interest revenue ($275,000) and development fees ($200,000) which were offset by a $550,000 increase in restricted revenue from consigned emissions allowances.
All revenue offsets are considered one-time in nature. Year-end expenditure projections anticipate an increase of $1,888,863 in expenditures over the current budget resulting primarily from a $1,816,413 increase in purchased power for natural gas and firm power.
Based upon current estimates and after factoring out the current net investment in capital assets and required reserve for debt service, the Electric Fund is expected to end the year with an approximate available net position of $16,592,151.
3 Packet Pg. 240
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
Water
The Water Fund revenue projections reflect a net decrease of $78,774 over the current budget, which is mostly attributed to an $80,000 decrease in anticipated interest income offset by some other minor adjustments. Water Fund expenditures through the end of fiscal year 2021-22 are expected to decrease complementarily by $212,837 over the current budget. The decrease in expenditures is mostly attributed to a $229,837 salary savings from vacant positions netted against minor operational adjustments based on year-to-date actuals.
Wastewater
The latest revenue projections in the Wastewater Fund reflect a $96,023 increase over the current budget, attributed to a $172,523 increase in revenue from Grant Terrace sewer charges offset by a $46,500 decrease in interest income and a $30,000 decrease in late charges. Expenditures are also projected to increase over the current budget by $277,383, which is associated with salary increases from previously negotiated MOU changes, a $49,365 increase in overtime, and nominal other adjustments in utilities operations expenses based on year-to-date actuals.
ALL OTHER FUNDS
All revenue or expenditure adjustments recommended for any other funds (not previously mentioned earlier in this report) are considered routine in nature and reflected on the Actual and Projected Fund Balances worksheet attached to this report.
All projections have been updated for balances as reflected in the ACFR for the year ended June 30, 2021, as well as any other known items through the date of this report.
FINANCE COMMITTEE
The Finance Committee met on January 19, 2022 to review the City Manager’s recommended FY2021-22 mid-year budget. The Committee reviewed the proposed General Fund adjustments, personnel requests, General Fund Transfer (GFT) analysis, available fund balance analysis, and a five-year financial forecast for the General Fund. The Committee was in agreement with the mid-year recommendations presented by staff.
Additionally, based on the five-year projections for the General Fund, the Finance Committee recommended that staff bring forward a one percent (1%) Transactions and Use Tax for separate City Council consideration for the November 2022 ballot.
FISCAL IMPACTS
Adoption of Resolution R-10-22, CUA-01-21, and CHA-01-21 will amend the budget to reflect the most current estimates to close the fiscal year. In summary, the respective major fund types are expected to end with the following projected available balances:
General Fund $ 8,310,399
3 Packet Pg. 241
Staff Report to the Mayor and City Council
FY2021-22 Mid-Year Budget Review
February 1, 2022
Special Revenue Funds $ 11,759,304
Capital Projects Funds $ 11,196,003
Debt Service $ 2,852,484
CFD and Special Assessment $ 1,112,478
Enterprise Funds $ 28,442,610
Internal Service Funds $ 3,150,541
Housing Authority $ 952,242
The available General Fund balance will continue to meet the City’s 15% reserve policy and anticipates funding for known General Fund liabilities.
ALTERNATIVES
1. Reject mid-year projections and proceed with current adopted budget
2. Provide alternate direction to staff
ATTACHMENT
1. Resolution R-10-22
2. CUA-01-22
3. CHA-01-22
4. FY21-22 Authorized position list_20220201
5. SALARY TABLE revised 2-1-22
3 Packet Pg. 242
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
RESOLUTION NO. R-10-22
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
COLTON, CALIFORNIA, AMENDING THE BUDGET FOR
FISCAL YEAR COMMENCING JULY 1, 2021 AND ENDING
JUNE 30, 2022
WHEREAS, on May 18, 2021 the City of Colton City Council adopted the budget for the fiscal year commencing July 1, 2021 and ending June 30, 2022; and WHEREAS, the City conducts regular reviews of their budgets as it is fiscally prudent to do so; and
WHEREAS, based upon the review conducted through December 31, 2021 and reviewed by the Finance Committee on January 19, 2022, the City desires to amend the budget;
NOW, THEREFORE, THE CITY COUNCIL DOES HEREBY RESOLVE,
DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The revised budgetary projections reflected on Exhibit A attached hereto and incorporated herein by reference, are hereby approved.
SECTION 2. The General Fund Transfer (the annual administrative transfer from the Electric Utility Fund to the General Fund) shall not exceed 20% of the Electric Utility revenues in accordance with the Flow of Funds Ordinance. The amount of the transfer was reviewed during the mid-year process, and the Council hereby authorizes the General Fund Transfer to remain at $10,500,000, or 17.5%.
SECTION 3. The positions identified in the authorized positions list are hereby authorized for funding, and any vacancies are hereby authorized for recruitment and appointment in accordance with the City’s Personnel System Rules and Regulations.
SECTION 4. Under the direction of the City Manager and Approved by the City Council, the Finance Department may make the reallocation of appropriations within the funds as defined in
3.a
Packet Pg. 243 Attachment: Resolution R-10-22 (3480 : FY2021-22 Mid-Year Budget Review) 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
- 2 -
Exhibit A.
SECTION 5. All recitals stated above are true and correct. Staff’s presentation and all of its attachments and/or other documents distributed to the City Council are also incorporated herein by reference, approved and adopted as findings.
SECTION 7: The FY 2021-22 Budget is in accordance with all applicable Ordinances of the City and all applicable statutes of the State.
APPROVED AND ADOPTED this 1
st day of February, 2022.
FRANK J. NAVARRO, Mayor
ATTEST:
CAROLINA R. PADILLA, City Clerk
3.a
Packet Pg. 244 Attachment: Resolution R-10-22 (3480 : FY2021-22 Mid-Year Budget Review) 123456789
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 -3-
Exhibit A
FY 2021-22
Revenues
FY 2021-22
Expenditures
Year-End Year-End
Projection Projection
General Fund (Available Balance) 49,852,166 51,291,896
General Fund Reserve - Pension - -
General Fund Reserve - Settlement - -
General Fund Reserve - OPEB - -
Total General Fund 49,852,166 51,291,896
Special Revenue Funds
Community Child Care 1,088,544 1,064,091
Special Gas Tax 1,391,606 1,372,283
Library Grant Fund 41,360 86,492
State Traffic Fund (SB-1) 1,063,055 1,271,182
Air Quality Fund (AQMD) 55,000 340,165
CDBG Fund 1,713,103 1,492,914
Drug/Gang Intervention - -
Measure I Fund 1,083,680 1,528,409
Local Fiscal Recovery Fund 7,443,000 1,434,949
ViTep 17,300 -
Miscellaneous Grants 9,723,003 9,101,221
Host City Fees 683,619 672,609
Asset Seizure Fund - 60,000
Total Special Revenue Funds 24,303,269 18,424,316
Capital Projects Funds
Park Development Fund 269,300 -
Traffic Impact Fee Fund 347,500 1,583,520
New Facilities Development Fees 213,400 -
Civic Center Development Fee 75 -
Fire Facility Development Fee 1,500 -
Police Facility Development Fee 2,000 -
Capital Improvement Fund (450) 3,153,288 3,150,215
Colton Crossing Fund (451) - 143,177
Total Capital Projects Funds 3,987,063 4,876,912
3.a
Packet Pg. 245 Attachment: Resolution R-10-22 (3480 : FY2021-22 Mid-Year Budget Review) 123456789
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 -4-
FY 2021-22
Revenues
FY 2021-22
Expenditures
Year-End Year-End
Projection Projection
Debt Service Funds
Public Financing Authority 911,683 906,533
Taxable Pension Bonds 2,167,614 2,066,922
Water Improvement District A 32,029 31,567
Total Debt Service Funds 3,111,326 3,005,022
CFD's and Assessment Districts
CFD 87-1 - 21,663
CFD 88-1 - 311,908
CFD 89-1 Debt Service - 64,760
CFD 89-2 Debt Service - 167,194
CFD 90-1 Debt Service - 65,657
Storm Water 637,559 750,531
LLMD #1 335,120 326,472
LLMD #2 167,915 137,872
Total CFD's and Assessment Districts 1,140,594 1,846,057 Enterprise Funds
Electric Utility 57,519,758 79,259,031
Public Benefit Fund 541,845 2,614,644
Water Utility 14,731,360 27,386,575
Wastewater Utility 10,620,608 16,345,983
Solid Waste 3,026,667 3,026,659
Cemetery Endowment 12,600 -
Total Enterprise Funds 86,452,838 128,632,892
Internal Service Funds
Facility & Equip Maint. Fund 837,949 1,920,296
Automotive Shop 740,337 809,438
Information Services 898,893 1,307,723
Insurances Fund 5,104,018 5,993,081
Total Internal Service Funds 7,581,197 10,030,538
Housing Authority
Total Housing Authority - -
Grand Totals 176,428,453 218,107,633
3.a
Packet Pg. 246 Attachment: Resolution R-10-22 (3480 : FY2021-22 Mid-Year Budget Review) 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
RESOLUTION NO. CUA 01-22
RESOLUTION OF THE UTILITY AUTHORITY OF THE
CITY OF COLTON, CALIFORNIA AMENDING THE
BUDGET FOR FISCAL YEAR COMMENCING JULY 1,
2021 AND ENDING JUNE 30, 2022
WHEREAS, the Colton Utility Authority (CUA) adopted the budget for the fiscal year commencing July 1, 2021 and ending June 30, 2022; and
WHEREAS, the CUA conducts regular reviews of its budgets, as it is fiscally prudent to do so; and
WHEREAS, based upon the review conducted through December 31, 2021, the CUA desires to amend the budget;
NOW, THEREFORE, UTILITY AUTHORITY OF THE CITY OF COLTON DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The budgetary projections amending the budget for the City of Colton for the fiscal year commencing July 1, 2021 and ending June 30, 2022, which includes the Utility Authority operations, is hereby approved and adopted and incorporated herein.
SECTION 2. Under the direction of the City Manager and Approved by the Utility Authority the Finance Department may make the reallocation of appropriations within the funds as defined herein.
SECTION 3: All recitals stated above are true and correct. Staff’s presentation and all of its attachments and/or other documents distributed to the City Council are also incorporated herein by reference, approved and adopted as findings.
SECTION 4: The FY 2021-22 Budget is in accordance with all applicable City Ordinances and all applicable statutes of the State.
3.b
Packet Pg. 247 Attachment: CUA-01-22 (3480 : FY2021-22 Mid-Year Budget Review) 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
- 2 -
APPROVED AND ADOPTED this 1
st day of February, 2022.
FRANK J. NAVARRO, Chairperson
ATTEST:
CAROLINA R. PADILLA, Secretary
3.b
Packet Pg. 248 Attachment: CUA-01-22 (3480 : FY2021-22 Mid-Year Budget Review) 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
RESOLUTION NO. CHA 01-22
RESOLUTION OF THE HOUSING AUTHORITY OF THE
CITY OF COLTON, CALIFORNIA AMENDING THE
BUDGET FOR FISCAL YEAR COMMENCING JULY 1, 2021
AND ENDING JUNE 30, 2022
WHEREAS, the Colton Housing Authority adopted the budget for the fiscal year commencing July 1, 2021 and ending June 30, 2021; and
WHEREAS, the Colton Housing Authority conducts regular reviews of their budgets as it is fiscally prudent to do so; and
WHEREAS, based upon the review conducted through December 31, 2021, the Colton Housing Authority desires to amend the budget;
NOW, THEREFORE, HOUSING AUTHORITY OF THE CITY OF COLTON DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The budgetary projections amending the budget for the City of Colton for the fiscal year commencing July 1, 2021 and ending June 30, 2022, which includes the Housing Authority operations, is hereby approved and adopted and incorporated herein.
SECTION 2. Under the direction of the City Manager and Approved by the Housing Authority the Finance Department may make the reallocation of appropriations within the funds as defined herein.
SECTION 3. All recitals stated above are true and correct. Staff’s presentation and all of its attachments and/or other documents distributed to the Housing Authority are also incorporated herein by reference, approved and adopted as findings.
SECTION 4: The FY 2021-22 Budget is in accordance with all applicable City Ordinances and all applicable statutes of the State.
3.c
Packet Pg. 249 Attachment: CHA-01-22 (3480 : FY2021-22 Mid-Year Budget Review) 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
- 2 -
APPROVED AND ADOPTED this 1
st day of February, 2022.
FRANK J. NAVARRO, Chairperson
ATTEST:
CAROLINA R. PADILLA, Secretary
3.c
Packet Pg. 250 Attachment: CHA-01-22 (3480 : FY2021-22 Mid-Year Budget Review) Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
FY 2021 FY 2022 FY 2022 FY 2022
City Council 7.00 7.00 7.00 7.00
City Clerk 3.00 3.00 3.00 3.00
City Treasurer 1.00 1.00 1.00 1.00
City Manager 6.00 6.00 6.00 5.00
Human Resources Department 4.00 4.00 4.00 4.00
Finance Department 27.00 27.00 27.00 28.00
Community Services Department 14.70 14.70 14.70 14.70
Development Services Department 11.00 12.00 12.00 13.00 Police Department 86.00 89.00 89.00 89.00
Fire Department 42.00 43.00 43.00 44.00
Public Works & Utility Services Department 120.00 121.00 121.00 121.00 321.70 327.70 327.70 329.70
Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
FY 2021 FY 2022 FY 2022 FY 2022
City Council
Mayor 1.00 1.00 1.00 1.00
Council Member 6.00 6.00 6.00 6.00
7.00 7.00 7.00 7.00
City Clerk
Deputy City Clerk 1.00 1.00 1.00 1.00
City Clerk 1.00 1.00 1.00 1.00
Administrative Assistant 1.00 1.00 1.00 1.00
3.00 3.00 3.00 3.00
City Treasurer
City Treasurer 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
City Manager
City Manager 1.00 1.00 1.00 1.00
Assistant City Manager 1.00 1.00 1.00 1.00
Executive Assistant to the City Manager 1.00 1.00 1.00 1.00 Administrative Assistant 1.00 1.00 1.00 0.00
Economic Development Manager 1.00 1.00 1.00 1.00
Economic Development Project Manager I/II 1.00 1.00 1.00 1.00 City Manager Totals: (Full Time Positions) 6.00 6.00 6.00 5.00 City Council Totals: (Full Time Positions)
City Council Totals: (Full Time Positions)
City Treasurer Totals: (Full Time Positions)
TOTAL FUNDED FULL-TIME POSITIONS
DETAIL
Total - City Full-Time Positions
TOTAL FUNDED FULL-TIME POSITIONS
Authorized Full-Time Positions
City of Colton
February 1, 2022
SUMMARY
3.d
Packet Pg. 251 Attachment: FY21-22 Authorized position list_20220201 (3480 : FY2021-22 Mid-Year Budget Review) Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
TOTAL FUNDED FULL-TIME POSITIONS FY 2021 FY 2022 FY 2022 FY 2022 Human Resources
Huamn Resources Director 1.00 1.00 1.00 1.00
Human Resource Analyst 1.00 1.00 1.00 1.00
Human Resource Specialist 2.00 2.00 2.00 2.00
4.00 4.00 4.00 4.00
Finance Department
Finance Director 1.00 1.00 1.00 1.00
Finance
Finance Manager 1.00 1.00 1.00 1.00
Senior Accountant 1.00 1.00 1.00 1.00
Payroll Analyst 1.00 1.00 1.00 1.00
Accountant 1.00 1.00 1.00 2.00
Payroll Technician I/II 1.00 1.00 1.00 1.00
Account Technician I/II 2.00 2.00 2.00 2.00
Customer Service
Purchasing/Customer Service Manager 0.80 0.80 0.80 0.80 Senior Customer Service Representative 2.00 2.00 2.00 2.00 Customer Service Representative I/II 10.00 10.00 10.00 10.00 Purchasing
Purchasing/Customer Service Manager 0.20 0.20 0.20 0.20 Warehouse Supervisor 1.00 1.00 1.00 1.00
Storekeeper 1.00 1.00 1.00 1.00
Account Technician I/II 1.00 1.00 1.00 1.00
Information Systems
I.T. Supervisor 1.00 1.00 1.00 1.00
I.T. Coordinator 1.00 1.00 1.00 1.00
Utilities Business Systems Analyst 0.00 0.00 0.00 0.00
Network Technician 1.00 1.00 1.00 1.00
27.00 27.00 27.00 28.00
Community Services
Community Services Director 1.00 1.00 1.00 1.00
Administrative Assistant 1.00 1.00 1.00 1.00
Community Child Care Manager 1.00 1.00 1.00 1.00
Community Child Care Administrative Assistant 1.00 1.00 1.00 1.00 Community Child Care Site Supervisor 1.00 1.00 1.00 1.00 Community Child Care Asst Site Supervisor 1.70 1.70 1.70 1.70 Library Branch Manager (pending due diligence) 1.00 1.00 1.00 1.00 Homeless Solutions Coordinator 1.00 1.00 1.00 1.00
Recreation Services Manager 1.00 1.00 1.00 1.00
Recreation Services Coordinator 5.00 5.00 5.00 5.00
14.70 14.70 14.70 14.70
Finance Department Totals: (Full Time Positions)
Community Services Totals: (Full Time Positions)
Human Resources Totals: (Full Time Positions)
3.d
Packet Pg. 252 Attachment: FY21-22 Authorized position list_20220201 (3480 : FY2021-22 Mid-Year Budget Review) Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
TOTAL FUNDED FULL-TIME POSITIONS FY 2021 FY 2022 FY 2022 FY 2022 Development Services
Development Services Director 1.00 1.00 1.00 1.00
Planning Manager 1.00 1.00 1.00 1.00
Administrative Assistant 1.00 1.00 1.00 1.00
Senior Office Specialist 0.00 1.00 1.00 1.00
Planning/Building Technician 2.00 2.00 2.00 2.00
Building Official 1.00 1.00 1.00 1.00
Plans Examiner I/II 1.00 1.00 1.00 1.00
Building Inspector I/II 1.00 1.00 1.00 1.00
Business License/Collections Officer 1.00 1.00 1.00 1.00 Senior Planner 1.00 1.00 1.00 1.00
Associate Planner 1.00 1.00 1.00 1.00
Assistant Planner (Pending Due Diligence) 0.00 0.00 0.00 1.00
11.00 12.00 12.00 13.00
Police Department
Police Chief 1.00 1.00 1.00 1.00
Police Captain 1.00 1.00 1.00 1.00
Executive Assistant to Police Chief 1.00 1.00 1.00 1.00 Information Technology Coordinator 1.00 1.00 1.00 1.00
Network Technician 0.00 1.00 1.00 1.00
Community Service Officer 5.00 5.00 5.00 5.00
Police Lieutenant 2.00 2.00 2.00 2.00
Police Sergeant 7.00 7.00 7.00 7.00
Police Corporal/Detective 12.00 12.00 12.00 12.00
Police Officer/Trainee 34.00 34.00 34.00 34.00
Animal Services Officer 2.00 2.00 2.00 2.00
Code Compliance Officer 4.00 4.00 4.00 4.00
Supervising Communication Dispatcher 1.00 1.00 1.00 1.00 Police Dispatcher I/II 9.00 9.00 9.00 9.00
Senior Police Dispatchers 0.00 2.00 2.00 2.00
Administrative Assistant 1.00 0.00 0.00 0.00
Police Records Supervisor 0.00 1.00 1.00 1.00
Police Services Clerk I/II 4.00 4.00 4.00 4.00
Police Maintenance Worker I 1.00 1.00 1.00 1.00
86.00 89.00 89.00 89.00
Fire Department
Fire Chief 1.00 1.00 1.00 1.00
Fire Battalion Chief 3.00 3.00 3.00 3.00
Fire Captain 12.00 12.00 12.00 12.00
Fire Engineer 12.00 12.00 12.00 12.00
Firefighter Medic 12.00 12.00 12.00 12.00
Fire Marshal 1.00 1.00 1.00 1.00
Fire Safety Specialist I/II 0.00 1.00 1.00 1.00
Executive Assistant 1.00 1.00 1.00 1.00
Office Specialist I/II 0.00 0.00 0.00 1.00
42.00 43.00 43.00 44.00
Police Department Totals: (Full Time Positions)
Development Services Totals: (Full Time Positions)
Fire Department Totals: (Full Time Positions)
3.d
Packet Pg. 253 Attachment: FY21-22 Authorized position list_20220201 (3480 : FY2021-22 Mid-Year Budget Review) Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
TOTAL FUNDED FULL-TIME POSITIONS FY 2021 FY 2022 FY 2022 FY 2022 Public Works & Utility Services
Public Works & Utility Services Director 1.00 1.00 1.00 1.00 Assistant Director of Utility Operations 1.00 1.00 1.00 1.00 Assistant Director of Public Works & Engineering 1.00 1.00 1.00 1.00 Public Works - Operations
Public Works Superintendent 1.00 1.00 0.00 0.00
Public Works Supervisor 0.00 0.00 1.00 1.00
Maintenance Worker III 1.00 1.00 1.00 1.00
Equipment Operator I/II 1.00 1.00 1.00 1.00
Maintenance Crew Leader 1.00 1.00 1.00 1.00
Maintenance Worker I/II 19.00 19.00 19.00 19.00
Lead Equipment Mechanic 1.00 1.00 1.00 1.00
Equipment Mechanic 2.00 2.00 2.00 2.00
Building Maintenance Supervisor 1.00 1.00 1.00 1.00
Building Maintenance Worker I/II 2.00 2.00 2.00 2.00
Maintenance Electrician (moved from Substation) 1.00 1.00 1.00 1.00
30.00 30.00 30.00 30.00
Administration
Utilities Planning Manager 1.00 1.00 1.00 1.00
Utilities Executive Assistant 1.00 1.00 1.00 1.00
Administrative Assistant 1.00 1.00 2.00 2.00
Senior Office Specialist 1.00 1.00 0.00 0.00
Office Specialist I/II 1.00 1.00 1.00 0.00
PW/W/WW Administrative Manager 1.00 1.00 1.00 1.00
Utilities Financial Analyst 1.00 0.00 0.00 0.00
Utility Resources Analyst 0.00 1.00 1.00 1.00
Utilities Business Systems Analyst 1.00 1.00 1.00 1.00
Accountant 1.00 1.00 1.00 1.00
Administrative Analyst I 1.00 1.00 1.00 2.00
10.00 10.00 10.00 10.00
Engineering
Elec. Utilities System Designer 1.00 1.00 1.00 1.00
Engineering/GIS Technician 1.00 1.00 1.00 1.00
GIS Specialist 1.00 1.00 1.00 1.00
Utilities Engineer 1.00 1.00 1.00 1.00
Associate Engineer 1.00 1.00 1.00 1.00
Engineering Technician I/II 1.00 1.00 1.00 1.00
Public Works & Utility Inspector 1.00 1.00 1.00 1.00
Senior Electric Utility Inspector 1.00 1.00 1.00 1.00
Capital Project Manager 1.00 1.00 1.00 1.00
9.00 9.00 9.00 9.00
Environmental, Sustainability, & Conservation
Environment & Conservation Supervisor 1.00 1.00 1.00 1.00 Senior Energy Services Specialist 1.00 1.00 1.00 1.00
Senior Water Conservation Specialist 1.00 1.00 1.00 1.00 Office Specialist I/II 2.00 2.00 2.00 2.00
5.00 5.00 5.00 5.00
Public Works Division Totals: (All Positions)
Subtotals:
Subtotals:
Subtotals:
3.d
Packet Pg. 254 Attachment: FY21-22 Authorized position list_20220201 (3480 : FY2021-22 Mid-Year Budget Review) Reorg
(12/15/20)
Original
Adopted
Reorg
(7/6/21)
Mid-Year
Budget
TOTAL FUNDED FULL-TIME POSITIONS FY 2021 FY 2022 FY 2022 FY 2022 Substation
Substation Superintendent 1.00 1.00 1.00 1.00
Substation Operations Supervisor 1.00 1.00 1.00 1.00
Substation Electrician/Substation Apprentice/Sr. Substation Electrician 4.00 5.00 5.00 5.00 Senior Consumer Service Field Rep 1.00 1.00 1.00 1.00
Consumer Service-Field Rep I/II 4.00 4.00 4.00 4.00
11.00 12.00 12.00 12.00
Transmission/Distribution
Transmission/Dist. Superintendent 1.00 0.00 0.00 0.00
Electric Field Operations Foreman 0.00 1.00 1.00 1.00
Line Crew Supervisor 3.00 3.00 3.00 3.00
Service Crew Supervisor 1.00 1.00 1.00 1.00
Powerline Technician/Apprentice/Apprentice Trainee 12.00 12.00 12.00 12.00
17.00 17.00 17.00 17.00
Water Utility
Water & Waste Water Utilities Superintendent 0.50 0.50 0.50 0.50 Water Utilities Supervisor 1.00 1.00 1.00 1.00
Lead Water Quality Specialist 0.00 0.00 0.00 0.00
Senior Water Quality Technician 1.00 1.00 1.00 1.00
Water Quality Technician II 1.00 1.00 1.00 1.00
Senior Water Treatment Operator 1.00 1.00 1.00 1.00
Water Treatment Opertor III 1.00 1.00 1.00 1.00
Water Treatment Operator I/II 1.00 1.00 1.00 1.00
Senior Water Distribution Operator 1.00 1.00 1.00 1.00
Water Distribution Operator I/II 6.00 6.00 6.00 6.00
Water Distribution Operator III 2.00 2.00 2.00 2.00
15.50 15.50 15.50 15.50
Wastewater Utility
Water & Waste Water Utilities Superintendent 0.50 0.50 0.50 0.50 Collection System Maintenance Supervisor 1.00 1.00 1.00 1.00 Senior Collection System Maintenance Technician 1.00 1.00 1.00 1.00 Collection System Maintenance Technician I/II 5.00 5.00 5.00 5.00 Wastewater Utilities Supervisor 1.00 1.00 1.00 1.00
Senior Wastewater Treatment Plant Operator 2.00 2.00 2.00 2.00 Wastewater Treatment Plant Operator I/II 7.00 7.00 7.00 7.00 Wastewater Treatment Plant Mechanic I/II 2.00 2.00 2.00 2.00
19.50 19.50 19.50 19.50
Public Works & Utility Services Department Totals: (Full-time) 120.00 121.00 121.00 121.00 Subtotals:
Subtotals:
Subtotals:
Subtotals:
3.d
Packet Pg. 255 Attachment: FY21-22 Authorized position list_20220201 (3480 : FY2021-22 Mid-Year Budget Review) Job Title Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E Account Technician I general 110 8/21/2021 19.5984 20.5783 21.6072 22.6876 23.8220 3,397.05 3,566.90 3,745.25 3,932.51 4,129.15 40,764.62 42,802.76 44,942.82 47,190.26 49,549.76 Account Technician II general 116 8/21/2021 21.5558 22.6336 23.7652 24.9535 26.2012 3,736.33 3,923.16 4,119.30 4,325.27 4,541.53 44,835.96 47,077.68 49,431.72 51,903.28 54,498.34 Accountant general 142 8/21/2021 26.7039 28.0391 29.4411 30.9131 32.4588 4,628.67 4,860.11 5,103.13 5,358.27 5,626.20 55,544.06 58,321.38 61,237.28 64,299.30 67,514.46 Administrative Analyst I midmngt 204 11/27/2021 27.4654 28.8387 30.2806 31.7947 33.3844 4,760.67 4,998.72 5,248.63 5,511.08 5,786.64 57,127.98 59,984.60 62,983.70 66,132.82 69,439.76 Administrative Analyst II midmngt 234 11/27/2021 30.2095 31.7201 33.3061 34.9713 36.7199 5,236.32 5,498.15 5,773.06 6,061.69 6,364.78 62,836.02 65,977.60 69,276.74 72,740.46 76,377.34 Administrative Assistant general 126 8/21/2021 20.4480 21.4705 22.5439 23.6711 24.8548 3,544.32 3,721.56 3,907.60 4,103.00 4,308.17 42,532.10 44,658.64 46,891.26 49,235.94 51,697.88 Animal Services Officer general 506 8/21/2021 19.3453 20.3126 21.3282 22.3946 23.5144 3,353.18 3,520.86 3,696.88 3,881.73 4,075.83 40,238.38 42,250.00 44,362.76 46,580.82 48,909.90 Assistant City Manager executive 817 12/25/2021 93.2466 16,162.74 193,952.92 Assistant Director of Public Works & Engineering executive 838 12/25/2021 68.2606 71.6737 75.2573 79.0202 82.9713 11,831.85 12,423.44 13,044.61 13,696.84 14,381.68 141,982.14 149,081.25 156,535.32 164,362.09 172,580.19 Assistant Director of Utility Operations executive 841 12/25/2021 68.2606 71.6737 75.2573 79.0202 82.9713 11,831.85 12,423.44 13,044.61 13,696.84 14,381.68 141,982.14 149,081.25 156,535.32 164,362.09 172,580.19 Associate Engineer midmngt 263 11/27/2021 41.3114 43.3770 45.5459 47.8231 50.2143 7,160.64 7,518.69 7,894.62 8,289.34 8,703.82 85,927.66 90,224.16 94,735.16 99,472.10 104,445.90 Associate Planner midmngt 210 11/27/2021 31.7388 33.3260 34.9920 36.7416 38.5788 5,501.39 5,776.51 6,065.28 6,368.55 6,686.99 66,016.86 69,317.82 72,783.62 76,422.58 80,243.80 Building Inspector I general 131 8/21/2021 22.6508 23.7833 24.9726 26.2211 27.5323 3,926.13 4,122.44 4,328.58 4,544.99 4,772.26 47,113.82 49,469.42 51,942.80 54,539.94 57,267.08 Building Inspector II general 179 8/21/2021 26.4774 27.8012 29.1913 30.6509 32.1835 4,589.41 4,818.88 5,059.83 5,312.82 5,578.48 55,072.94 57,826.60 60,717.80 63,753.82 66,941.42 Building Maintenance Supervisor midmngt 253 11/27/2021 34.7250 36.4612 38.2843 40.1985 42.2084 6,019.00 6,319.93 6,635.95 6,967.74 7,316.13 72,228.00 75,839.14 79,631.24 83,612.88 87,793.68 Building Official midmngt 093 11/27/2021 50.1603 52.6683 55.3018 58.0669 60.9702 8,694.44 9,129.17 9,585.64 10,064.92 10,568.17 104,333.32 109,550.22 115,027.64 120,779.10 126,818.12 Business Lic./Collections Ofcr. midmngt 206 11/27/2021 23.5381 24.7150 25.9508 27.2483 28.6108 4,079.94 4,283.94 4,498.14 4,723.04 4,959.21 48,959.30 51,407.20 53,977.82 56,676.36 59,510.36 Capital Project Manager midmngt 837 11/27/2021 40.1264 42.1327 44.2393 46.4513 48.7739 6,955.24 7,303.00 7,668.15 8,051.56 8,454.14 83,462.86 87,636.12 92,017.90 96,618.86 101,449.66 Chief Deputy City Clerk midmngt 278 12/25/2021 28.4724 29.8960 31.3908 32.9604 34.6084 4,935.21 5,181.97 5,441.07 5,713.14 5,998.78 59,222.54 62,183.68 65,292.76 68,557.32 71,985.42 City Clerk elected 1/1/2016 370.00 4,440.00
City Engineer executive 999 12/25/2021 68.4240 11,860.16 142,321.90 City Manager contract 812 12/21/2021 97.6870 16,932.42 203,189.00 City Treasurer elected 1/1/2016 2,225.00 26,700.00
Code Enforcement Officer general 138 8/21/2021 24.7782 26.0170 27.3180 28.6838 30.1180 4,294.89 4,509.62 4,735.12 4,971.86 5,220.45 51,538.50 54,115.36 56,821.18 59,662.20 62,645.44 Collection System Maintenance Supervisor midmngt 257 11/27/2021 38.0026 39.9027 41.8978 43.9927 46.1923 6,587.12 6,916.47 7,262.28 7,625.39 8,006.66 79,045.20 82,997.46 87,147.32 91,504.92 96,080.14 Collection System Maintenance Technician I ibew2 158 1/1/2022 22.1497 23.2573 24.4201 25.6410 26.9230 3,839.27 4,031.27 4,232.82 4,444.44 4,666.65 46,071.48 48,375.08 50,793.60 53,333.54 55,999.84 Collection System Maintenance Technician II ibew2 197 1/1/2022 25.4799 26.7538 28.0917 29.4962 30.9710 4,416.51 4,637.32 4,869.22 5,112.68 5,368.30 52,998.14 55,648.06 58,430.32 61,352.20 64,419.68 Collections Systems Maint Worker in Trg ibew2 190 1/1/2022 17.7242 18.6105 19.5411 20.5181 21.5439 3,072.19 3,225.82 3,387.13 3,556.46 3,734.27 36,866.70 38,709.84 40,645.28 42,677.70 44,811.26 Community Child Care Admin. Asst. general 134 8/21/2021 20.4480 21.4705 22.5439 23.6711 24.8548 3,544.32 3,721.56 3,907.60 4,103.00 4,308.17 42,532.10 44,658.64 46,891.26 49,235.94 51,697.88 Community Child Care Asst Site Supvr. midmngt 261 11/27/2021 17.6725 18.5562 19.4839 20.4581 21.4811 3,063.23 3,216.41 3,377.22 3,546.08 3,723.40 36,758.80 38,596.74 40,526.46 42,552.90 44,680.74 Community Child Care Manager midmngt 252 11/27/2021 33.5136 35.1893 36.9488 38.7962 40.7361 5,809.03 6,099.48 6,404.45 6,724.68 7,060.93 69,708.34 73,193.90 76,853.40 80,696.20 84,730.88 Community Child Care Site Supvr. midmngt 260 11/27/2021 19.6299 20.6115 21.6420 22.7241 23.8603 3,402.51 3,572.65 3,751.29 3,938.85 4,135.78 40,830.14 42,871.66 45,015.36 47,266.18 49,629.32 Community Service Officer general 607 8/21/2021 19.1327 20.0893 21.0937 22.1485 23.2559 3,316.34 3,482.14 3,656.25 3,839.08 4,031.03 39,795.86 41,785.64 43,875.00 46,068.62 48,372.22 Community Services Director * executive 804 12/25/2021 82.9713 14,381.68 172,580.16 Consumer Service Field Rep. I ibew 971 12/30/2017 25.5064 26.7816 28.1208 29.5269 31.0031 4,421.11 4,642.15 4,874.26 5,117.99 5,373.88 53,053.26 55,705.78 58,491.16 61,415.90 64,486.50 Consumer Service Field Rep. II ibew 973 12/30/2017 28.0641 29.4674 30.9406 32.4878 34.1120 4,864.45 5,107.68 5,363.04 5,631.21 5,912.75 58,373.38 61,292.14 64,356.50 67,574.52 70,952.96 Customer Svc. Rep. I general 107 8/21/2021 17.4774 18.3512 19.2688 20.2323 21.2439 3,029.42 3,180.87 3,339.93 3,506.93 3,682.27 36,353.20 38,170.60 40,079.26 42,083.08 44,187.26 Customer Svc. Rep. II general 113 8/21/2021 19.2334 20.1951 21.2049 22.2651 23.3784 3,333.79 3,500.49 3,675.52 3,859.29 4,052.26 40,005.42 42,005.86 44,106.14 46,311.46 48,627.02 Deputy City Clerk cnfdtl 173 2/1/2022 24.3709 25.5894 26.8689 28.2125 29.6231 4,224.29 4,435.50 4,657.28 4,890.16 5,134.67 50,691.68 53,226.16 55,887.52 58,682.00 61,616.10 Deputy Fire Chief executive 993 12/25/2021 64.4060 67.6263 71.0076 74.5580 78.2859 11,163.70 11,721.88 12,307.97 12,923.37 13,569.54 133,964.40 140,662.56 147,695.64 155,080.44 162,834.48 Development Services Director * executive 810 12/25/2021 82.9713 14,381.68 - - - - 172,580.16 Economic Development Manager midmngt 226 11/27/2021 44.7352 46.9719 49.3205 51.7865 54.3759 7,754.11 8,141.79 8,548.88 8,976.33 9,425.16 93,049.06 97,701.50 102,586.90 107,715.92 113,101.82 Economic Development Project Manager I midmngt 272 11/27/2021 31.6130 33.1937 34.8533 36.5960 38.4258 5,479.59 5,753.57 6,041.24 6,343.31 6,660.47 65,755.04 69,042.74 72,494.76 76,119.68 79,925.56 Economic Development Project Manager II midmngt 273 11/27/2021 37.9318 39.8284 41.8198 43.9108 46.1062 6,574.84 6,903.60 7,248.76 7,611.21 7,991.74 78,898.04 82,843.02 86,985.08 91,334.36 95,901.00 Electric Field Operations Foreman ibew 7/6/2021 51.2562 53.8190 56.5100 59.3355 62.3022 8,884.41 9,328.63 9,795.06 10,284.81 10,799.05 106,612.90 111,943.54 117,540.72 123,417.75 129,588.64 Electric Utility Director * executive 836 12/25/2021 88.8063 15,393.09 - - - - 184,717.08 Electric Utility Inspector ibew 920 12/30/2017 35.6983 37.4831 39.3574 41.3251 43.3915 6,187.70 6,497.08 6,821.95 7,163.02 7,521.19 74,252.36 77,964.90 81,863.34 85,956.26 90,254.32 Electric Utility System Designer midmngt 250 11/27/2021 39.9017 41.8968 43.9916 46.1912 48.5008 6,916.30 7,262.11 7,625.20 8,006.48 8,406.80 82,995.38 87,145.24 91,502.58 96,077.80 100,881.56 Electrical Sys Engineer/GIS Project Manager midmngt 221 11/27/2021 38.8821 40.8262 42.8675 45.0109 47.2614 6,739.57 7,076.55 7,430.37 7,801.89 8,191.97 80,874.82 84,918.34 89,164.40 93,622.88 98,303.92 Energy Services Specialist midmngt 231 11/27/2021 33.6458 35.3281 37.0945 38.9492 40.8967 5,831.93 6,123.53 6,429.71 6,751.19 7,088.77 69,983.42 73,482.50 77,156.56 81,014.44 85,064.98 Engineering Assistant midmngt 264 11/27/2021 34.6025 36.3326 38.1492 40.0567 42.0595 5,997.77 6,297.66 6,612.52 6,943.16 7,290.32 71,973.20 75,571.86 79,350.44 83,317.78 87,484.02 Engineering GIS Technician ibew 907 12/30/2017 32.0504 33.6529 35.3356 37.1024 38.9575 5,555.40 5,833.17 6,124.84 6,431.08 6,752.63 66,664.78 69,997.98 73,498.10 77,172.94 81,031.60 Engineering Manager midmngt 207 11/27/2021 43.7660 45.9543 48.2519 50.6645 53.1978 7,586.10 7,965.41 8,363.66 8,781.84 9,220.95 91,033.02 95,585.10 100,364.16 105,382.16 110,651.58 Engineering Technician I general 125 8/21/2021 23.8278 25.0192 26.2702 27.5837 28.9629 4,130.15 4,336.66 4,553.51 4,781.18 5,020.24 49,561.98 52,040.04 54,641.86 57,374.20 60,242.78 Engineering Technician II general 156 8/21/2021 27.4025 28.7727 30.2113 31.7218 33.3079 4,749.77 4,987.27 5,236.62 5,498.45 5,773.37 56,997.20 59,847.06 62,839.40 65,981.50 69,280.64 Environmental and Conservation Supervisor midmngt 238 11/27/2021 38.7059 40.6413 42.6733 44.8070 47.0473 6,709.02 7,044.49 7,396.70 7,766.55 8,154.86 80,508.48 84,533.80 88,760.62 93,198.56 97,858.54 Equipment Mechanic general 129 8/21/2021 22.0781 23.1821 24.3411 25.5581 26.8361 3,826.88 4,018.24 4,219.13 4,430.07 4,651.59 45,922.50 48,218.56 50,629.54 53,160.90 55,819.14 Equipment Operator II general 124 8/21/2021 20.6742 21.7080 22.7933 23.9330 25.1296 3,583.53 3,762.73 3,950.85 4,148.39 4,355.79 43,002.18 45,152.38 47,409.96 49,780.38 52,269.62 Executive Administrator to Mayor and Council cnfdtl 820 12/25/2021 35.4489 37.2213 39.0824 41.0365 43.0884 6,144.47 6,451.70 6,774.28 7,112.99 7,468.66 73,733.66 77,420.46 81,291.60 85,355.92 89,623.82 Executive Assistant midmngt 268 11/27/2021 25.2690 26.5324 27.8591 29.2520 30.7146 4,379.96 4,598.94 4,828.91 5,070.35 5,323.87 52,559.52 55,187.34 57,946.72 60,844.16 63,886.42 Executive Assistant to City Manager cnfdtl 819 12/25/2021 32.2504 33.8629 35.5560 37.3337 39.2004 5,590.07 5,869.57 6,163.05 6,471.18 6,794.74 67,080.78 70,434.78 73,956.22 77,654.20 81,537.04 Executive Assistant to Police Chief midmngt 203 11/27/2021 25.2690 26.5324 27.8591 29.2520 30.7146 4,379.96 4,598.94 4,828.91 5,070.35 5,323.87 52,559.52 55,187.34 57,946.72 60,844.16 63,886.42 Finance Director * executive 807 12/25/2021 82.9713 14,381.68 172,580.16 Finance Manager cnfdtl 460 12/25/2021 47.5736 49.9523 52.4499 55.0725 57.8260 8,246.10 8,658.40 9,091.32 9,545.90 10,023.18 98,953.14 103,900.94 109,095.74 114,550.54 120,278.08 Fire Battalion Chief fire 309 11/27/2021 39.5816 41.5607 43.6387 45.8207 48.1117 9,605.14 10,085.39 10,589.66 11,119.15 11,675.10 115,261.64 121,024.80 127,075.78 133,429.92 140,101.26 Fire Captain fire 304 11/27/2021 31.2762 32.8400 34.4819 36.2062 38.0164 7,589.68 7,969.17 8,367.60 8,786.03 9,225.31 91,076.18 95,629.82 100,411.48 105,432.34 110,703.58 ANNUAL
Revised Date
FULL TIME CLASSIFICATIONS
SALARY TABLE
Bargaining HOURLY MONTHLY
Unit
FY 2021-22
REVISED 2/1/2022
Pay
Grade
3.e
Packet Pg. 256 Attachment: SALARY TABLE revised 2-1-22 (3480 : FY2021-22 Mid-Year Budget Review) Job Title Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E ANNUAL
Revised Date
FULL TIME CLASSIFICATIONS
SALARY TABLE
Bargaining HOURLY MONTHLY
Unit
FY 2021-22
REVISED 2/1/2022
Pay
Grade
Fire Chief * executive 815 12/25/2021 88.8063 15,393.09 184,717.08 Fire Engineer fire 303 11/27/2021 27.7482 29.1356 30.5924 32.1219 33.7281 6,733.57 7,070.25 7,423.76 7,794.92 8,184.69 80,802.54 84,842.94 89,084.84 93,539.16 98,216.30 Fire Marshal fire 306 11/27/2021 55.3991 58.1690 61.0775 64.1314 67.3379 9,602.51 10,082.62 10,586.77 11,116.11 11,671.91 115,229.92 120,991.52 127,041.20 133,393.26 140,062.78 Fire Safety Specialist I general 157 8/21/2021 22.6508 23.7833 24.9726 26.2211 27.5323 3,926.13 4,122.44 4,328.58 4,544.99 4,772.26 47,113.82 49,469.42 51,942.80 54,539.94 57,267.08 Fire Safety Specialist II general 330 8/21/2021 26.4774 27.8012 29.1913 30.6509 32.1834 4,589.41 4,818.88 5,059.83 5,312.82 5,578.46 55,072.94 57,826.60 60,717.80 63,753.82 66,941.42 Firefighter fire 301 12/29/2018 21.6238 22.7051 23.8404 25.0323 26.2839 5,247.39 5,509.77 5,785.26 6,074.51 6,378.23 62,968.62 66,117.22 69,423.12 72,894.12 76,538.80 Firefighter Medic fire 308 11/27/2021 26.0146 27.3153 28.6810 30.1151 31.6209 6,312.87 6,628.51 6,959.93 7,307.93 7,673.33 75,754.38 79,542.32 83,519.28 87,695.14 92,080.04 GIS Specialist general 166 8/21/2021 24.7655 26.0038 27.3040 28.6691 30.1027 4,292.69 4,507.32 4,732.69 4,969.30 5,217.80 51,512.24 54,087.80 56,792.32 59,631.78 62,613.46 Homeless Solutions Coordinator general 103 8/21/2021 24.3780 25.5969 26.8768 28.2205 29.6316 4,225.52 4,436.80 4,658.65 4,891.55 5,136.15 50,706.24 53,241.50 55,903.64 58,698.90 61,633.78 Human Resources Analyst cnfdtl 835 12/25/2021 33.2305 34.8920 36.6366 38.4683 40.3918 5,759.95 6,047.95 6,350.35 6,667.83 7,001.24 69,119.44 72,575.36 76,203.92 80,014.22 84,015.10 Human Resources Director * executive 994 12/25/2021 82.9713 14,381.68 172,580.16 Human Resources Manager cnfdtl 218 12/25/2021 47.5736 49.9523 52.4499 55.0725 57.8260 8,246.10 8,658.40 9,091.32 9,545.90 10,023.18 98,953.14 103,900.94 109,095.74 114,550.54 120,278.08 Human Resources Specialist cnfdtl 149 12/25/2021 26.7448 28.0820 29.4862 30.9605 32.5085 4,635.76 4,867.54 5,110.94 5,366.49 5,634.81 55,629.08 58,410.56 61,331.14 64,397.84 67,617.42 Human Resources Technician general 145 8/21/2021 22.3614 23.4794 24.6534 25.8861 27.1804 3,875.97 4,069.77 4,273.26 4,486.92 4,711.27 46,511.66 48,837.10 51,279.02 53,843.14 56,535.18 Information Technology Coordinator midmngt 279 11/27/2021 35.1750 36.9338 38.7804 40.7194 42.7554 6,097.00 6,401.85 6,721.94 7,058.02 7,410.94 73,164.00 76,822.46 80,663.18 84,696.30 88,931.44 Information Technology Supervisor midmngt 990 11/27/2021 40.4502 42.4728 44.5964 46.8263 49.1676 7,011.36 7,361.94 7,730.04 8,116.56 8,522.39 84,136.52 88,343.32 92,760.72 97,398.34 102,268.66 Lead Equipment Mechanic general 130 8/21/2021 26.9620 28.3101 29.7256 31.2118 32.7724 4,673.41 4,907.08 5,152.43 5,410.04 5,680.56 56,080.70 58,885.06 61,829.30 64,920.70 68,166.80 Library Manager midmngt 291 11/27/2021 39.4928 41.4674 43.5407 45.7178 48.0038 6,845.41 7,187.68 7,547.05 7,924.42 8,320.66 82,144.92 86,252.14 90,564.76 95,092.92 99,847.80 Line Crew Supervisor ibew 916 12/30/2017 48.1194 50.5254 53.0516 55.7041 58.4894 8,340.69 8,757.73 9,195.62 9,655.38 10,138.16 100,088.30 105,092.78 110,347.38 115,864.58 121,657.90 Literacy Coordinator/Branch Supervisor midmngt 276 11/27/2021 28.8878 30.3323 31.8488 33.4413 35.1133 5,007.21 5,257.61 5,520.45 5,796.49 6,086.30 60,086.52 63,091.08 66,245.66 69,557.80 73,035.82 Maintenance Crew Leader general 178 8/21/2021 23.3810 24.5500 25.7775 27.0664 28.4197 4,052.71 4,255.32 4,468.11 4,691.51 4,926.09 48,632.48 51,064.00 53,617.20 56,298.06 59,113.08 Maintenance Electrician ibew 908 12/30/2017 31.0373 32.5891 34.2185 35.9295 37.7261 5,379.79 5,648.78 5,931.21 6,227.78 6,539.20 64,557.48 67,785.38 71,174.48 74,733.36 78,470.34 Maintenance Worker I general 111 8/21/2021 18.4404 19.3624 20.3305 21.3471 22.4144 3,196.33 3,356.15 3,523.96 3,700.17 3,885.16 38,355.98 40,273.74 42,287.44 44,402.02 46,621.90 Maintenance Worker I, Building general 117 8/21/2021 20.7187 21.7546 22.8423 23.9844 25.1836 3,591.25 3,770.79 3,959.33 4,157.30 4,365.16 43,094.74 45,249.62 47,511.88 49,887.50 52,381.94 Maintenance Worker I, Police general 135 8/21/2021 18.4404 19.3624 20.3305 21.3471 22.4144 3,196.33 3,356.15 3,523.96 3,700.17 3,885.16 38,355.98 40,273.74 42,287.44 44,402.02 46,621.90 Maintenance Worker II general 115 8/21/2021 19.3656 20.3339 21.3506 22.4182 23.5391 3,356.71 3,524.54 3,700.77 3,885.83 4,080.12 40,280.50 42,294.72 44,409.30 46,629.70 48,961.12 Maintenance Worker II, Building general 118 8/21/2021 21.7509 22.8384 23.9804 25.1794 26.4383 3,770.15 3,958.66 4,156.61 4,364.42 4,582.64 45,241.82 47,504.08 49,879.18 52,373.10 54,991.82 Maintenance Worker III general 153 8/21/2021 22.2417 23.3538 24.5215 25.7476 27.0349 3,855.22 4,048.00 4,250.40 4,462.92 4,686.05 46,262.84 48,575.80 51,004.72 53,555.06 56,232.80 Maintenance Worker III, Building general 132 8/21/2021 25.0219 26.2731 27.5867 28.9660 30.4143 4,337.13 4,554.00 4,781.70 5,020.77 5,271.80 52,045.50 54,647.84 57,380.18 60,249.28 63,261.90 Meter Technician ibew 980 12/30/2017 37.8661 39.7594 41.7475 43.8349 46.0266 6,563.46 6,891.63 7,236.23 7,598.05 7,977.95 78,761.54 82,699.50 86,834.80 91,176.54 95,735.38 Meter Technician Apprentice ibew 983 12/30/2017 33.2788 34.9428 36.6899 38.5245 40.4506 5,768.32 6,056.74 6,359.58 6,677.58 7,011.44 69,219.80 72,680.92 76,314.94 80,130.96 84,137.30 Network Technician general 168 8/21/2021 24.3435 25.5607 26.8388 28.1807 29.5897 4,219.54 4,430.52 4,652.06 4,884.65 5,128.88 50,634.74 53,166.36 55,824.60 58,615.96 61,546.68 Office Specialist I general 186 8/21/2021 15.8600 16.6530 17.4857 18.3599 19.2779 2,749.07 2,886.52 3,030.85 3,182.39 3,341.51 32,988.80 34,638.24 36,370.10 38,188.54 40,097.98 Office Specialist II general 106 8/21/2021 16.8292 17.6707 18.5542 19.4819 20.4560 2,917.05 3,062.92 3,216.07 3,376.85 3,545.71 35,004.84 36,754.90 38,592.84 40,522.30 42,548.48 Payroll Analyst cnfdtl 839 12/25/2021 33.2305 34.8920 36.6366 38.4683 40.3918 5,759.95 6,047.95 6,350.35 6,667.83 7,001.24 69,119.44 72,575.36 76,203.92 80,014.22 84,015.10 Payroll Technician I general 121 8/21/2021 21.5620 22.6401 23.7721 24.9607 26.2087 3,737.41 3,924.28 4,120.50 4,326.52 4,542.85 44,848.96 47,091.20 49,446.02 51,918.10 54,514.20 Payroll Technician II general 170 8/21/2021 23.7207 24.9068 26.1521 27.4597 28.8327 4,111.58 4,317.18 4,533.03 4,759.69 4,997.67 49,339.16 51,806.04 54,396.16 57,116.02 59,972.12 Planning Manager midmngt 262 11/27/2021 42.3060 44.4213 46.6424 48.9745 51.4232 7,333.04 7,699.69 8,084.68 8,488.91 8,913.36 87,996.48 92,396.20 97,015.88 101,866.70 106,960.10 Planning/Building Technician general 193 8/21/2021 22.1095 23.2150 24.3758 25.5946 26.8743 3,832.31 4,023.93 4,225.14 4,436.40 4,658.22 45,987.76 48,287.20 50,701.56 53,236.56 55,898.70 Plans Examiner I general 840 8/21/2021 29.1251 30.5813 32.1104 33.7159 35.4018 5,048.36 5,300.76 5,565.81 5,844.08 6,136.31 60,580.26 63,609.26 66,789.58 70,129.28 73,635.64 Plans Examiner II general 342 8/21/2021 32.0376 33.6395 35.3215 37.0875 38.9420 5,553.19 5,830.85 6,122.39 6,428.49 6,749.95 66,638.26 69,970.16 73,468.72 77,142.26 80,999.36 Police Captain cpma 402 11/27/2021 60.3405 63.3574 66.5256 69.8515 73.3443 10,459.02 10,981.95 11,531.11 12,107.59 12,713.00 125,508.24 131,783.34 138,373.30 145,291.12 152,556.04 Police Chief * executive 808 12/25/2021 88.8063 15,393.09 184,717.08 Police Cpl./Detective police 510 8/21/2021 38.0405 39.9426 41.9397 44.0367 46.2384 6,593.69 6,923.39 7,269.54 7,633.04 8,014.65 79,124.24 83,080.66 87,234.42 91,596.44 96,175.82 Police Dispatcher I dispatch 603 9/4/2021 21.0836 22.1379 23.2447 24.4070 25.6273 3,654.50 3,837.23 4,029.07 4,230.55 4,442.06 43,853.94 46,046.78 48,348.82 50,766.56 53,304.68 Police Dispatcher II dispatch 605 9/4/2021 23.2423 24.4043 25.6248 26.9060 28.2513 4,028.68 4,230.09 4,441.62 4,663.71 4,896.88 48,344.14 50,761.10 53,299.48 55,964.48 58,762.60 Police Lieutenant cpma 401 11/27/2021 54.8550 57.5976 60.4779 63.5014 66.6766 9,508.20 9,983.59 10,482.83 11,006.91 11,557.28 114,098.40 119,803.06 125,793.98 132,082.86 138,687.38 Police Officer police 508 8/21/2021 34.2615 35.9746 37.7733 39.6621 41.6452 5,938.66 6,235.58 6,547.36 6,874.77 7,218.50 71,263.92 74,826.96 78,568.36 82,497.22 86,621.86 Police Officer Trainee police2 507 8/21/2021 25.2855 26.5496 27.8772 29.2713 30.7347 4,382.84 4,601.94 4,832.06 5,073.68 5,327.34 52,594.10 55,223.22 57,984.68 60,884.20 63,928.02 Police Records Supervisor midmngt 610 11/27/2021 23.8792 25.0731 26.3268 27.6431 29.0253 4,139.05 4,346.01 4,563.31 4,791.47 5,031.04 49,668.84 52,152.10 54,759.90 57,497.70 60,372.52 Police Sergeant police 511 8/21/2021 45.3347 47.6014 49.9817 52.4805 55.1046 7,858.02 8,250.91 8,663.50 9,096.62 9,551.47 94,296.28 99,010.86 103,962.04 109,159.44 114,617.62 Police Services Clerk I general 601 8/21/2021 16.2501 17.0627 17.9158 18.8116 19.7521 2,816.69 2,957.54 3,105.40 3,260.67 3,423.70 33,800.26 35,490.52 37,264.76 39,128.18 41,084.42 Police Services Clerk II general 602 8/21/2021 17.0621 17.9152 18.8109 19.7515 20.7391 2,957.43 3,105.30 3,260.55 3,423.59 3,594.77 35,488.96 37,263.46 39,126.88 41,082.86 43,137.12 Police Support Services Manager midmngt 512 11/27/2021 35.4489 37.2213 39.0824 41.0365 43.0884 6,144.47 6,451.70 6,774.28 7,112.99 7,468.66 73,733.66 77,420.46 81,291.60 85,355.92 89,623.82 Power Line Helper ibew 905 12/30/2017 27.7414 29.1285 30.5849 32.1141 33.7198 4,808.51 5,048.94 5,301.38 5,566.45 5,844.76 57,702.06 60,587.28 63,616.54 66,797.38 70,137.08 Power Line Technician ibew 918 12/30/2017 41.8401 43.9321 46.1289 48.4353 50.8570 7,252.29 7,614.90 7,995.67 8,395.44 8,815.21 87,027.46 91,378.82 95,948.06 100,745.32 105,782.56 Power Line Technician Apprentice ibew 909 12/30/2017 35.5716 37.3503 39.2178 41.1786 43.2376 6,165.75 6,474.04 6,797.74 7,137.63 7,494.52 73,988.98 77,688.52 81,572.92 85,651.54 89,934.26 Principal Librarian midmngt 211 11/27/2021 30.3920 31.9116 33.5072 35.1826 36.9417 5,267.95 5,531.34 5,807.91 6,098.32 6,403.22 63,215.36 66,376.18 69,695.08 73,179.86 76,838.84 Production Supervisor midmngt 283 11/27/2021 31.2354 32.7971 34.4369 36.1588 37.9668 5,414.13 5,684.84 5,969.06 6,267.53 6,580.91 64,969.58 68,218.02 71,628.96 75,210.46 78,971.10 Public Works & Utilities Director * executive 842 12/25/2021 88.8063 15,393.09 - - - - 184,717.08 Public Works & Utility Inspector ibew2 995 1/1/2022 31.7537 33.3414 35.0085 36.7587 38.5968 5,503.98 5,779.18 6,068.14 6,371.51 6,690.12 66,047.54 69,350.32 72,817.42 76,458.20 80,281.24 Public Works & Water/Wastewater Admin Manager midmngt 200 11/27/2021 45.2325 47.4942 49.8688 52.3623 55.1658 7,840.30 8,232.33 8,643.93 9,076.13 9,562.06 94,083.60 98,787.78 103,727.26 108,913.48 114,744.50 Public Works Director * executive 806 12/25/2021 88.8063 15,393.09 184,717.08 Public Works Engineering Superintendent midmngt 298 11/27/2021 53.4393 56.1113 58.9168 61.8627 65.1657 9,262.81 9,725.97 10,212.25 10,722.88 11,295.39 111,153.90 116,711.66 122,547.10 128,674.52 135,473.78 Public Works Equipment Operator II general 124 8/21/2021 20.6742 21.7080 22.7933 23.9330 25.1296 3,583.53 3,762.73 3,950.85 4,148.39 4,355.79 43,002.18 45,152.38 47,409.96 49,780.38 52,269.62 Public Works Superintendent midmngt 997 11/27/2021 36.8577 38.7006 40.6357 42.6674 44.8008 6,388.66 6,708.11 7,043.52 7,395.69 7,765.48 76,664.12 80,497.30 84,522.10 88,748.14 93,185.56
3.e
Packet Pg. 257 Attachment: SALARY TABLE revised 2-1-22 (3480 : FY2021-22 Mid-Year Budget Review) Job Title Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E Step A Step B Step C Step D Step E ANNUAL
Revised Date
FULL TIME CLASSIFICATIONS
SALARY TABLE
Bargaining HOURLY MONTHLY
Unit
FY 2021-22
REVISED 2/1/2022
Pay
Grade
Public Works Supervisor midmngt 451 11/27/2021 34.7250 36.4612 38.2843 40.1985 42.2084 6,019.00 6,319.93 6,635.95 6,967.74 7,316.13 72,228.00 75,839.40 79,631.24 83,613.14 87,793.68 Purchasing and Customer Service Manager midmngt 224 11/27/2021 46.5037 48.8289 51.2704 53.8339 56.5255 8,060.63 8,463.68 8,886.87 9,331.21 9,797.75 96,727.80 101,564.06 106,642.38 111,974.72 117,573.30 Recreation Services Coordinator general 123 8/21/2021 22.1158 23.2216 24.3827 25.6019 26.8819 3,833.40 4,025.07 4,226.34 4,437.66 4,659.52 46,001.02 48,300.98 50,716.12 53,251.90 55,914.56 Recreation Services Manager midmngt 239 11/27/2021 39.8890 41.8834 43.9777 46.1765 48.4854 6,914.09 7,259.78 7,622.80 8,003.93 8,404.14 82,969.12 87,117.68 91,473.72 96,047.12 100,849.58 Senior Accountant midmngt 233 11/27/2021 32.9850 34.6342 36.3660 38.1842 40.0935 5,717.40 6,003.25 6,303.43 6,618.59 6,949.53 68,608.80 72,039.24 75,641.28 79,423.24 83,394.22 Senior Collection System Maintenance Technician ibew2 198 1/1/2022 26.7538 28.0915 29.4961 30.9710 32.5194 4,637.32 4,869.19 5,112.66 5,368.31 5,636.70 55,648.06 58,430.06 61,351.94 64,419.68 67,640.56 Senior Consumer Service Field Rep ibew 906 12/30/2017 30.8734 32.4169 34.0378 35.7396 37.5265 5,351.39 5,618.93 5,899.88 6,194.87 6,504.59 64,216.62 67,427.10 70,798.52 74,338.42 78,055.12 Senior Customer Service Rep general 122 8/21/2021 22.1158 23.2216 24.3827 25.6019 26.8819 3,833.40 4,025.07 4,226.34 4,437.66 4,659.52 46,001.02 48,300.98 50,716.12 53,251.90 55,914.56 Senior Electric Utility Inspector ibew 982 12/30/2017 40.1339 42.1405 44.2475 46.4600 48.7829 6,956.54 7,304.35 7,669.57 8,053.07 8,455.70 83,478.46 87,652.24 92,034.80 96,636.80 101,468.38 Senior Energy Services Specialist midmngt 992 11/27/2021 37.6974 39.5822 41.5613 43.6394 45.8214 6,534.21 6,860.92 7,203.95 7,564.17 7,942.37 78,410.54 82,331.08 86,447.40 90,769.90 95,308.46 Senior Office Specialist general 120 8/21/2021 18.0501 18.9526 19.9003 20.8953 21.9400 3,128.69 3,285.12 3,449.38 3,621.85 3,802.94 37,544.26 39,421.46 41,392.52 43,462.38 45,635.46 Senior Planner midmngt 228 11/27/2021 37.9948 39.8946 41.8893 43.9837 46.1830 6,585.76 6,915.06 7,260.81 7,623.84 8,005.05 79,029.08 82,980.56 87,129.64 91,485.94 96,060.38 Senior Police Dispatcher dispatch 606 9/4/2021 25.5649 26.8431 28.1853 29.5945 31.0743 4,431.25 4,652.81 4,885.44 5,129.71 5,386.20 53,174.94 55,833.70 58,625.32 61,556.56 64,634.44 Senior Substation Electrician ibew 978 12/30/2017 44.1973 46.4071 48.7275 51.1640 53.7221 7,660.86 8,043.90 8,446.10 8,868.43 9,311.84 91,930.28 96,526.82 101,353.20 106,421.12 111,742.02 Senior Utilities Financial Analyst midmngt 213 11/27/2021 40.3422 42.3594 44.4773 46.7012 49.0362 6,992.64 7,342.29 7,709.40 8,094.87 8,499.60 83,911.88 88,107.50 92,512.94 97,138.60 101,995.40 Senior Wastewater Treatment Plant Mechanic ibew2 12/30/2017 30.4333 31.9550 33.5526 35.2303 36.9919 5,275.10 5,538.87 5,815.78 6,106.58 6,411.93 63,301.16 66,466.40 69,789.46 73,278.92 76,943.10 Senior Wastewater Treatment Plant Operator ibew2 161 1/1/2022 34.3311 36.0477 37.8500 39.7426 41.7297 5,950.73 6,248.26 6,560.66 6,888.71 7,233.15 71,408.74 74,979.32 78,728.00 82,664.66 86,797.88 Senior Water Conservation Specialist general 993 8/21/2021 31.7366 33.3234 34.9896 36.7391 38.5760 5,501.01 5,776.06 6,064.86 6,368.11 6,686.51 66,011.92 69,312.62 72,778.42 76,417.12 80,238.08 Senior Water Distribution Operator ibew2 137 1/1/2022 31.0337 32.5854 34.2146 35.9254 37.7216 5,379.17 5,648.14 5,930.53 6,227.08 6,538.41 64,550.20 67,777.58 71,166.42 74,724.78 78,460.98 Senior Water Quality Technician ibew2 991 1/1/2022 33.4571 35.1302 36.8861 38.7309 40.6675 5,799.22 6,089.24 6,393.59 6,713.36 7,049.03 69,591.08 73,070.40 76,639.68 80,560.22 84,588.40 Senior Water Treatment Operator ibew2 137 1/1/2022 31.0337 32.5854 34.2146 35.9254 37.7216 5,379.17 5,648.14 5,930.53 6,227.08 6,538.41 64,550.20 67,777.58 71,166.42 74,724.78 78,460.98 Senior Water Utilities Operator ibew2 12/30/2017 29.9756 31.4743 33.0480 34.7005 36.4354 5,195.78 5,455.55 5,728.32 6,014.76 6,315.48 62,349.30 65,466.44 68,739.84 72,177.04 75,785.58 Service Crew Supervisor ibew 915 12/30/2017 46.0263 48.3276 50.7439 53.2811 55.9451 7,977.88 8,376.79 8,795.61 9,235.40 9,697.16 95,734.60 100,521.46 105,547.26 110,824.74 116,365.86 Storekeeper general 147 8/21/2021 18.2882 19.2026 20.1628 21.1709 22.2294 3,169.95 3,328.44 3,494.88 3,669.63 3,853.09 38,039.56 39,941.46 41,938.52 44,035.42 46,237.10 Substation Electrician ibew 977 12/30/2017 40.1775 42.1864 44.2956 46.5104 48.8359 6,964.10 7,312.31 7,677.91 8,061.80 8,464.89 83,569.20 87,747.66 92,134.90 96,741.58 101,578.62 Substation Electrician Apprentice ibew 976 12/30/2017 35.9178 37.7138 39.5994 41.5793 43.6584 6,225.74 6,537.05 6,863.89 7,207.07 7,567.45 74,708.92 78,444.60 82,366.70 86,484.84 90,809.42 Substation Operations Supervisor ibew 979 12/30/2017 48.9304 51.3769 53.9458 56.6430 59.4751 8,481.27 8,905.33 9,350.60 9,818.12 10,309.02 101,775.18 106,863.90 112,207.16 117,817.44 123,708.26 Substation Superintendent midmngt 225 11/27/2021 54.9401 57.6870 60.5714 63.6000 66.7800 9,522.95 9,999.08 10,499.03 11,024.00 11,575.20 114,275.20 119,989.22 125,988.46 132,288.00 138,902.40 Supervising Communication Dispatcher dispatch 608 9/4/2021 30.6754 32.2090 33.8194 35.5104 37.2859 5,317.04 5,582.87 5,862.03 6,155.13 6,462.89 63,804.52 66,994.46 70,344.30 73,861.58 77,554.62 Transmission/Distr. Superintendent midmngt 217 11/27/2021 54.9401 57.6870 60.5714 63.6000 66.7800 9,522.95 9,999.08 10,499.03 11,024.00 11,575.20 114,275.20 119,989.22 125,988.46 132,288.00 138,902.40 Utilities Business Systems Analyst midmngt 205 11/27/2021 35.1750 36.9338 38.7804 40.7194 42.7554 6,097.00 6,401.85 6,721.94 7,058.02 7,410.94 73,164.00 76,822.46 80,663.44 84,696.30 88,931.44 Utilities Engineer midmngt 297 11/27/2021 41.3114 43.3770 45.5458 47.8231 50.2143 7,160.64 7,518.69 7,894.60 8,289.33 8,703.82 85,927.66 90,224.16 94,735.42 99,472.10 104,445.64 Utilities Executive Assistant midmngt 998 11/27/2021 25.2690 26.5324 27.8591 29.2520 30.7146 4,379.96 4,598.94 4,828.91 5,070.35 5,323.87 52,559.52 55,187.34 57,946.72 60,844.16 63,886.16 Utilities Financial Analyst midmngt 290 11/27/2021 36.1254 37.9318 39.8284 41.8197 43.9107 6,261.74 6,574.84 6,903.58 7,248.74 7,611.18 75,141.04 78,898.04 82,843.02 86,985.08 91,334.36 Utilities Planning Manager midmngt 450 11/27/2021 50.5129 53.0385 55.6904 58.4750 61.3987 8,755.57 9,193.34 9,653.01 10,135.66 10,642.44 105,066.78 110,320.08 115,836.24 121,628.00 127,709.14 Utilities Plans Examiner midmngt 236 11/27/2021 27.8053 29.1956 30.6554 32.1881 33.7975 4,819.58 5,060.58 5,313.61 5,579.27 5,858.23 57,835.18 60,726.90 63,763.18 66,951.30 70,299.06 Utility Resource Analyst midmngt 497 11/27/2021 41.3114 43.3770 45.5459 47.8231 50.2143 7,160.64 7,518.69 7,894.62 8,289.34 8,703.82 85,927.66 90,224.16 94,735.16 99,472.10 104,445.64 Warehouse Supervisor midmngt 275 11/27/2021 24.0165 25.2174 26.4782 27.8021 29.1922 4,162.86 4,371.02 4,589.55 4,819.03 5,059.98 49,954.32 52,452.14 55,074.50 57,828.42 60,719.88 Wastewater Equip Mech-In-Training ibew2 175 1/1/2022 18.2026 19.1128 20.0686 21.0719 22.1255 3,155.12 3,312.88 3,478.56 3,652.47 3,835.09 37,861.46 39,754.78 41,742.74 43,829.50 46,021.04 Wastewater Operator-in-Training ibew2 167 1/1/2022 17.1936 18.0532 18.9558 19.9037 20.8987 2,980.22 3,129.22 3,285.68 3,449.98 3,622.44 35,762.48 37,550.50 39,428.22 41,399.80 43,469.40 Wastewater Treatment Plant Mechanic I ibew2 155 1/1/2022 23.5008 24.6758 25.9100 27.2051 28.5653 4,073.46 4,277.14 4,491.06 4,715.55 4,951.32 48,881.56 51,325.56 53,892.02 56,586.14 59,415.72 Wastewater Treatment Plant Mechanic II ibew2 159 1/1/2022 30.0073 31.5076 33.0830 34.7371 36.4739 5,201.26 5,461.32 5,734.39 6,021.09 6,322.15 62,415.34 65,535.60 68,812.64 72,252.96 75,865.66 Wastewater Treatment Plant Operator I ibew2 133 1/1/2022 25.9729 27.2714 28.6353 30.0667 31.5703 4,501.97 4,727.05 4,963.45 5,211.55 5,472.18 54,023.58 56,724.72 59,561.06 62,539.10 65,665.86 Wastewater Treatment Plant Operator II ibew2 184 1/1/2022 29.8616 31.3549 32.9223 34.5686 36.2971 5,176.01 5,434.85 5,706.54 5,991.90 6,291.49 62,111.92 65,218.14 68,478.28 71,902.48 75,498.02 Wastewater Utilities Manager midmngt 219 11/27/2021 47.6806 50.0647 52.5678 55.1963 57.9561 8,264.64 8,677.87 9,111.75 9,567.35 10,045.72 99,175.70 104,134.42 109,341.18 114,808.20 120,548.74 Wastewater Utilities Supervisor midmngt 255 11/27/2021 38.0026 39.9027 41.8978 43.9927 46.1923 6,587.12 6,916.47 7,262.28 7,625.39 8,006.66 79,045.20 82,997.46 87,147.32 91,504.92 96,080.14 Water & Wastewater Utilities Superintendent midmngt 299 11/27/2021 55.0739 57.8276 60.7190 63.7549 66.9426 9,546.14 10,023.45 10,524.63 11,050.85 11,603.39 114,553.66 120,281.46 126,295.52 132,610.14 139,240.66 Water Conservation Specialist general 189 8/21/2021 28.7745 30.2132 31.7239 33.3100 34.9756 4,987.58 5,236.96 5,498.81 5,773.73 6,062.43 59,850.96 62,843.56 65,985.66 69,285.06 72,749.04 Water Distribution Operator I ibew2 100 1/1/2022 23.1248 24.2810 25.4951 26.7697 28.1083 4,008.29 4,208.70 4,419.16 4,640.08 4,872.10 48,099.48 50,504.74 53,029.60 55,681.08 58,465.16 Water Distribution Operator II ibew2 146 1/1/2022 25.6989 26.9839 28.3331 29.7498 31.2371 4,454.47 4,677.21 4,911.07 5,156.63 5,414.42 53,453.66 56,126.20 58,933.16 61,879.48 64,973.48 Water Distribution Operator III ibew2 181 1/1/2022 29.5551 31.0327 32.5843 34.2135 35.9242 5,122.88 5,378.99 5,647.94 5,930.34 6,226.86 61,474.40 64,548.12 67,775.24 71,164.34 74,722.18 Water Equipment Operator I ibew2 12/30/2017 18.6728 19.6064 20.5866 21.6160 22.6966 3,236.61 3,398.44 3,568.35 3,746.78 3,934.08 38,839.32 40,781.26 42,820.18 44,961.28 47,208.98 Water Equipment Operator II ibew2 171 1/1/2022 21.4550 22.5275 23.6541 24.8366 26.0785 3,718.87 3,904.76 4,100.05 4,305.02 4,520.27 44,626.40 46,857.20 49,200.58 51,659.92 54,243.02 Water Quality Specialist ibew2 183 1/1/2022 29.8678 31.3612 32.9290 34.5755 36.3043 5,177.09 5,435.94 5,707.69 5,993.09 6,292.75 62,124.66 65,231.40 68,492.32 71,917.30 75,513.10 Water Quality Technician I ibew2 100 1/1/2022 23.1248 24.2810 25.4951 26.7697 28.1083 4,008.29 4,208.70 4,419.16 4,640.08 4,872.10 48,099.48 50,504.74 53,029.60 55,681.08 58,465.16 Water Quality Technician II ibew2 146 1/1/2022 25.6989 26.9839 28.3331 29.7498 31.2371 4,454.47 4,677.21 4,911.07 5,156.63 5,414.42 53,453.66 56,126.20 58,933.16 61,879.48 64,973.48 Water Treatment Operator I ibew2 100 1/1/2022 23.1248 24.2810 25.4951 26.7697 28.1083 4,008.29 4,208.70 4,419.16 4,640.08 4,872.10 48,099.48 50,504.74 53,029.60 55,681.08 58,465.16 Water Treatment Operator II ibew2 146 1/1/2022 25.6989 26.9839 28.3331 29.7498 31.2371 4,454.47 4,677.21 4,911.07 5,156.63 5,414.42 53,453.66 56,126.20 58,933.16 61,879.48 64,973.48 Water Treatment Operator III ibew2 181 1/1/2022 29.5551 31.0327 32.5843 34.2135 35.9242 5,122.88 5,378.99 5,647.94 5,930.34 6,226.86 61,474.40 64,548.12 67,775.24 71,164.34 74,722.18 Water Utilities Manager midmngt 269 11/27/2021 47.5736 49.9523 52.4499 55.0725 57.8260 8,246.10 8,658.40 9,091.32 9,545.90 10,023.18 98,953.14 103,900.94 109,095.74 114,550.54 120,278.08 Water Utilities Operator ibew2 154 1/1/2022 26.9807 28.3296 29.7462 31.2335 32.7952 4,676.65 4,910.46 5,156.00 5,413.80 5,684.51 56,119.96 58,925.36 61,872.20 64,965.68 68,213.86 Water Utilities Supervisor midmngt 254 11/27/2021 38.0011 39.9012 41.8962 43.9911 46.1906 6,586.86 6,916.20 7,262.01 7,625.12 8,006.37 79,042.34 82,994.34 87,144.20 91,501.54 96,076.50 * Executive unit members on contract with maximum allowable salary amounts listed in Step E The City of Colton salary schedule may be updated intermittently to include salary revisions contractually provisioned by Council-approved MOUs
3.e
Packet Pg. 258 Attachment: SALARY TABLE revised 2-1-22 (3480 : FY2021-22 Mid-Year Budget Review) ITEM NO. 4
STAFF REPORT
DATE: FEBRUARY 1, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: CAROLINA PADILLA, CITY CLERK
SUBJECT: APPROVAL OF MINUTES FOR THE CITY COUNCIL REGULAR MEETING HELD ON JANUARY 18, 2022, ON FILE IN THE OFFICE OF THE CITY CLERK.
RECOMMENDED ACTION
Staff recommends that the City Council take the following action:
Approval of Minutes for the City Council Regular Meeting Held on January 18, 2022.
BACKGROUND
Minutes for the City Council Regular Meeting Held on January 18, 2022.
FISCAL IMPACTS
None
ATTACHMENT
1. 01-18-2021 Draft Minutes
4 Packet Pg. 259
2022 JANUARY 18 CC/CUA/CPFA/CHA MEETING 1 -
CITY COUNCIL/COLTON UTILITY AUTHORITY/
COLTON PUBLIC FINANCING AUTHORITY AND COLTON HOUSING AUTHORITY
CLOSED SESSION MINUTES
January 18, 2022
Closed Session Meeting held on the above given date at 5:01 p.m., in City Hall, located at 650 North La Cadena Drive, Colton, California with Mayor Navarro presiding.
CITY COUNCIL ROLL CALL
Councilmembers present were Toro (appeared at 5:02 p.m.), Cisneros, Koperski, González, Echevarria, Suchil; and Mayor Navarro.
STAFF PRESENT
City Manager Smith, City Attorney Campos, and City Clerk Padilla.
CLOSED SESSION
City Attorney Campos announced the City Council would meet in Closed Session to Discuss Item A/B/C.
A. CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
Pursuant to Government Code Section 54956.9(d)(1)
Jose Garcia v. City of Colton, et al.
San Bernardino Superior Court, Case No. CIVDS 1918148
B. CONFERENCE WITH LABOR NEGOTIATIORS
Pursuant to Government Code Section 54957.6
Agency designated representatives: Tom Cody, Human Resources Director Employee Groups: Colton Police Officers Association
Colton Police Management Association
Colton Firefighters Association
C. CLOSED SESSION- CITY ATTORNEY EVALUATION
Public Employee Evaluation
Title: City Attorney
Mayor Navarro adjourned the meeting to Closed Session at 5:02 p.m. and at 6:01 p.m., the meeting reconvened, with all members present heretofore.
City Attorney Campos announced that the City Council did meet in Closed Session and discussed Item A/B/C; with direction to staff and no reportable action.
***************************************************************************
CITY COUNCIL/COLTON UTILITY AUTHORITY/
COLTON PUBLIC FINANCING AUTHORITY AND COLTON HOUSING AUTHORITY
REGULAR MEETING MINUTES
January 18, 2022
Regular Meeting held on the above-given date at 6:02 p.m. in City Hall, located at 650 North La Cadena Drive, Colton, California with Mayor Navarro presiding.
4.a
Packet Pg. 260 Attachment: 01-18-2021 Draft Minutes (3486 : Draft Minutes 1-18-2022) 2022 JANUARY 18 CC/CUA/CPFA/CHA MEETING 2 -
INVOCATION: Pastor Don Duenez- Echoes of Love Ministry
FLAG SALUTE: City Treasurer Aurelio De La Torre (Veteran)
CITY COUNCIL ROLL CALL
Council Members Present Staff Present
Frank J. Navarro, Mayor William R. Smith, City Manager
David J. Toro Carlos Campos, City Attorney
Ernest R. Cisneros Carolina R. Padilla, City Clerk
Kenneth J. Koperski
Dr. Luis S. González
John R. Echevarria
Isaac T. Suchil
Council Members Absent
None
***************************************************************************
MAYOR AND COUNCIL ITEMS
POSSIBLE CONFLICT OF INTEREST DISCLOSURES FOR THE COUNCIL MEETING OF JANUARY 18, 2022.
GIFT DISCLOSURES
Mayor Navarro asked the members present if there were any agenda items that were a conflict of interest pursuant to CMC Section 2.04.030. None disclosed.
AB 1234 ORAL REPORTS
Mayor Navarro asked the members present if there were any brief reports on meetings attended at the expense of the City. (GC Section 53232.3(d). None disclosed.
***************************************************************************
PUBLIC HEARINGS
(1) Development Agreement - Barton Road Logistics Center
TIME AND PLACE FIXED TO CONSIDER A PUBLIC HEARING TO INTRODUCE BY TITLE ONLY ORDINANCE NO. O-03-22, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
COLTON APPROVING THE BARTON ROAD LOGISTICS CENTER DEVELOPMENT AGREEMENT FOR PROPERTY GENERALLY LOCATED AT 21700 BARTON ROAD AND 275, 280 AND 375 DE BERRY STREET IN THE CITY OF COLTON, ORDINANCE NO. O-03-22.
Mayor Navarro declared the Public Hearing open.
City Clerk Padilla submitted the Notice of the Public Hearing (on file in the City Clerk’s Office) and there were no reports of protests or objections thereto.
Staff Presentation
Director Mark Tomich, Development Services, presented for Council consideration an overview of the agenda item and requested approval of staff’s recommendation
4.a
Packet Pg. 261 Attachment: 01-18-2021 Draft Minutes (3486 : Draft Minutes 1-18-2022) 2022 JANUARY 18 CC/CUA/CPFA/CHA MEETING 3 -
Public Comment
The following community members addressed the Council: Jacob Kleespies; Zack Strasters; Thomas Ruiz; Cesar Victorio; Pam Lemos; Ana Gonzales; and Bobbie Forbes.
Motion and Second by CM González/CM Suchil to close the public hearing.
Vote: Unanimous
Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff:
Director Tomich; Asst. Director Victor Ortiz; City Attorney Campos; and City Manager Smith.
Second Motion
Motion and Second by CM Suchil/CM Cisneros to continue the item to another day.
Vote: Motion failed with CM Cisneros/CM Suchil voting YES and CM Toro/MPT Koperski/CM González/CM Echevarria/Mayor Navarro voting NO.
Main Motion
Motion and Second by MPT Koperski/CM Echevarria waive full reading, read by title only and introduce Ordinance No. O-03-22.
Vote: Motion carried with CM González/CM Suchil voting NO and CM Toro/CM Cisneros/MPT Koperski/CM Echevarria/Mayor Navarro voting YES.
BUSINESS ITEMS
(2) Warehouse Moratorium - Ad-Hoc Committee Recommendations - Consider Recommendations of the Warehouse Moratorium Ad-Hoc Committee and Provide Direction to Staff.
Staff Presentation
Director Mark Tomich, Development Services, presented for Council consider recommendations of the Warehouse Moratorium Ad-Hoc Committee and provide direction to staff.
Public Comment
The following community members addressed the Council: Bill Blankenship; Breanna Hall; Ana Gonzales; Tammy Hong; Darby Osnaya; Angie Balderas; Gary Grossich; and Kristen Malaby.
Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff:
Director Tomich and City Manager Smith.
Direction to Staff
Full consensus by Council to approve and direct staff to implement all recommendations of the Warehouse Moratorium Ad-Hoc Committee which include a series of specific Zoning Code and Building Code amendments, policy initiatives which are listed in the body of the Agenda Report under Issues/Analysis and outlined in Attachment 1 of the Agenda Report.
*************************************************************************** Public Comment
The following community members addressed the Council: Pam Lemos ***************************************************************************
4.a
Packet Pg. 262 Attachment: 01-18-2021 Draft Minutes (3486 : Draft Minutes 1-18-2022) 2022 JANUARY 18 CC/CUA/CPFA/CHA MEETING 4 -
CONSENT CALENDAR
Mayor Navarro presents the Consent Calendar Items 3 through 8.
Councilmembers present selected items for discussion and clarification by staff: CM Suchil, Item 8, will be voting NO on this item.
Motion and Second by CM González/MPT Koperski to approve the consent calendar Item 3 through 8.
Vote: Unanimous with CM Suchil voting NO on Item 8.
(3) Minutes - Approval of Minutes for the City Council Regular Meetings Held on December 21, 2021 and January 4, 2022.
(4) Warrants - Approve voucher numbers 196371 to 196436 dated 12/23/2021 and totaling $826,131.89; voucher numbers 196437to 196524 dated 12/28/2021 and totaling $79,290.45; voucher numbers 196525 to 196668 dated 12/30/2021 and totaling 1,306,762.18 and payroll disbursement listing dated 11/13/2021 to 11/26/2021 and totaling $821,144.46.
(5) Agreement - Rivers & Lands Conservancy - Approve Endowment Management Agreement with the Rivers & Lands Conservancy.
(6) Investment Authority - City Treasurer - Approve and Adopt a Resolution for the City Council to delegate Investment Authority to the City Treasurer, RESOLUTION NO. R-06-22. (7) Lease Agreement Extension - Alliance Energy - Approve and Adopt Resolution R-08-22 and Approve the Extension of Land Lease Agreements at the Drews and Century Substations, RESOLUTION R-08-
22. (8) Notice of Completion - FY 2020-21 Asphalt Paving Project - Approve Notice of Completion for the Fiscal Year 20-21 Asphalt Paving Project.
MAYOR AND COUNCIL ORAL REPORTS AND COMMENTS
Comments from Mayor, Council and City Treasurer on various issues and activities throughout the community.
CITY MANAGER'S REPORTS
None
ADJOURNMENT
At 8:26 p.m.. Mayor Navarro adjourned the Regular Council Meeting in Memorium of José Urea and Robert Zermeño.
_________________________________
Carolina R. Padilla
City Clerk
4.a
Packet Pg. 263 Attachment: 01-18-2021 Draft Minutes (3486 : Draft Minutes 1-18-2022) ITEM NO. 5
STAFF REPORT
DATE: FEBRUARY 1, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: AURELIO DE LA TORRE, CITY TREASURER
SUBJECT: RECEIVE AND FILE CITY TREASURER'S REPORT FOR OCTOBER AND NOVEMBER 2021.
RECOMMENDED ACTION
Staff recommends that the City Council take the following action:
Receive and File City Treasurer’s Report for October and November 2021.
ATTACHMENT
1. Treasurer's Report October 2021
2. Treasurer's Report November 2021
5 Packet Pg. 264
5.a
Packet Pg. 265 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 266 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 267 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 268 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 269 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 270 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 271 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 272 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 273 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.a
Packet Pg. 274 Attachment: Treasurer's Report October 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 275 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 276 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 277 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 278 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 279 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 280 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 281 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 282 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 283 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report)
5.b
Packet Pg. 284 Attachment: Treasurer's Report November 2021 (3485 : Treasurer's Report) ITEM NO. 6
STAFF REPORT
DATE: FEBRUARY 1, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: STACEY DABBS, FINANCE DIRECTOR
SUBJECT: APPROVE US BANK VOUCHER DATED 12/29/2021 AND
TOTALING $61,954.27; WIRES DATED 01/06/2022 AND TOTALING $5,199,596.53; VOUCHER NUMBERS 196669 TO 196743 DATED
01/06/2022 AND TOTALING $764,313.11; VOUCHER NUMBERS
196744 TO 196873 DATED 01/13/2022 AND TOTALING $370,406.80; AND PAYROLL DISBURSEMENT LISTING DATED 11/27/2021 TO
12/10/2021 AND TOTALING $898,658.32.
RECOMMENDED ACTION
Staff recommends that the City Council take the following action:
Approve US Bank voucher dated 12/29/2021 and totaling $61,954.27; wires dated 01/06/2022 and totaling $5,199,596.53; voucher numbers 196669 to 196743 dated 01/06/2022 and totaling $764,313.11; voucher numbers 196744 to 196873 dated 01/13/2022 and totaling $370,406.80; and payroll disbursement listing dated 11/27/2021 to 12/10/2021 and totaling $898,658.32.
BACKGROUND
The California Government Code requires that the legislative body ratify all vouchers issued in the course of conducting City business.
ISSUES/ANALYSIS
All vouchers and related backup documentation have been reviewed by the City Treasurer.
FISCAL IMPACTS
None.
6 Packet Pg. 285
Staff Report to the Mayor and City Council
Warrants - Accounts Payable
February 1, 2022
ALTERNATIVES
1. Provide alternative direction to staff.
ATTACHMENTS
1. Fund number & Title legend
2. Voucher lists and payroll disbursements
ATTACHMENT
1. Fund Number and Title Legend
2. Voucher lists
3. Payroll Registers
6 Packet Pg. 286
City of Colton
Fund Number and Title Legend
Fund Title Fund Title
100 GENERAL FUND 701 LLMD #2
150 TREASURERS ACCOUNT GROUP 702 LLMD #1
206 COMMUNITY CHILD CARE 703 CFO 87-1 DEBT SERVICE
209 DSF FLY CONSERVATION 704 CFO 87-1 CONSTRUCTION
210 SPECIAL GAS TAX 707 CFO 88-1 DEBT SERVICE
211 LIBRARY GRANT FUND 708 CFO 88-1 CONSTRUCTION
212 STATE TRAFFIC RELIEF FUND 709 DSF FLY CONSERVATION
213 S.Y.E.T.P. GRANT 722 STORM WATER
214 POLLUTION REDUCTION FUND 733 CFO 89-1 CONSTRUCTION
215 COMMUNITY DEV ACT FUND 734 CFO 89-2 CONSTRUCTION
216 CDBG HOUSING REHAB FUND 744 CFO 89-1 DEBT SERVICE
217 DRUG/GANG INTERVENTION 745 CFO 89-2 DEBT SERVICE
218 MEASURE I FUND 750 AQUA MANSA CFO
219 STATE AID- CAPITAL PROJECTS 754 SB COUNTY HOSPITAL
220 Vi Tep 762 TRUST AND AGENCY
225 MISC GRANTS 766 DEFERRED COMPENSATION
240 HOST CITY FEES - CIP 781 CFO 90-1 DEBT SERVICE
247 Quimby In Lieu Fees 782 CFO 90-1 CONSTRUCTION
248 PARK DEVELOPMENT FUND 850 Redevelopment Obligation Retirement Fund 249 TRAFFIC IMPACT FUND 851 Successor Agency Administration 250 NEW FACILITIES DEVELOPMENT FEE 855 Housing Auth - RM PARK DEVELOPMENT 251 CIVIC CENTER DEVELOPMENT FEE 856 Housing Auth - RANCHO MED BOND PROCEEDS 252 FIRE FACILITY DEVELOPMENT FEE 857 LMI Asset Fund
253 POLICE FACILITY DEVELOPMENT FEE 864 Housing Auth - LOW/MOD BOND PROCEEDS 261 ASSET FORFEITURE 865 Housing Auth - RANCHO MED CHFA 326 AD 94-1 DEBT SERVICE 866 ECONOMIC DEVELOPMENT
332 1971 SEWER BONDS, A & C 867 Consolidation Proj_08-09 350 PFA Debt Fund 870 Housing Auth - RM PARK OPERATIONS 357 POB-Non Enterprise 871 Successor Agcy-RANCHO/M ILL PROJECT AREA 358 PENSION OBLIGATION DEBT SERVICE 872 Successor Agcy-RANCHO/MILL DEBT SERVICE 359 CORP YARD DEBT SERVICE 873 Successor Agcy-RDA II PROJECT FUND 363 1978-2 ASSESSMENT DIST. 874 Housing Auth - LOW/MOD DEBT SERVICE 364 WATER IMPRVMNT DIST A 875 Housing Auth - LOW/MOD BOND PROCEEDS 379 AD 1979-1 DEBT SERVICE 876 Successor Agcy-SANTA ANA RIV BND PROCEED 427 AD 94-1 CONSTRUCTION 877 Successor Agcy-SANTA ANA RIVER CIP 450 Capital Improvement Projects 878 RDA FIXED ASSETS GROUP 451 Colton Crossing Fund 879 Successor Agcy-WEST VALLEY CIP 453 STREET IMPROVEMENTS PRGM 881 Successor Agcy-MT VERNON BOND PROCEEDS 457 CAPITAL IMPROVEMENT 882 Successor Agcy-MT VERNON CIP 469 EQUIPMENT REPLACEMENT 885 Successor Agcy-MT VERNON DEBT SERVICE 520 ELECTRIC UTILITY 886 RDA ADM INISTRATION
521 WATER UTILITY 887 COOLEY RANCH - now 894
522 WASTEWATER UTILITY 888 MT VERNON - now 882
523 SOLID WASTE 889 WEST VALLEY - now 879
524 CEMETERY 890 Successor Agcy-RDA - LONG TERM DEBT GRP 525 RECYCLING 891 Successor Agcy-RDA I DEBT SERVICE FUND 526 PUBLIC BENEFIT FUND 892 Successor Agcy-RDA I - CAPITAL PROJECTS 527 WASTEWATER UTILITY - GRAND TERRACE 893 Successor Agcy-RDA II DEBT SERVICE FUND 551 WATER DEVELOPMENT 894 Successor Agcy-COOLEY RANCH PROJECT 552 SEWER DEVELOPMENT 895 Successor Agcy-COOLEY RANCH DEBT SERV 560 CEMETARY ENDOWMENT CARE 896 SANTA ANA RIVER - now 877 605 Facility & Equipment Maintenance Fund 897 Successor Agcy-SANTA ANA RIVER DEBT SVC 606 INFORMATION SERVICES FUND 898 Housing Auth - LOW/MOD CAPITAL PROJECTS 607 INSURANCE FUND 899 Successor Agcy-WEST VALLEY PRJ - DBT SV 608 AUTOMOTIVE SHOP 941 GENERAL LONG-TERM DEBT
610 AUTOMOTIVE SHOPS 958 GENERAL FIXED ASSETS
990 GASB 34
6.a
Packet Pg. 287 Attachment: Fund Number and Title Legend (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 288 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 289 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 290 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 291 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 292 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 293 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 294 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 295 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 296 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 297 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 298 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 299 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 300 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 301 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 302 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 303 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 304 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 305 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 306 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 307 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 308 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 309 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 310 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 311 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 312 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 313 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 314 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 315 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 316 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 317 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 318 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 319 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 320 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 321 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 322 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 323 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 324 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 325 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 326 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 327 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 328 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 329 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 330 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 331 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 332 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 333 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 334 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 335 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 336 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 337 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 338 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 339 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 340 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 341 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 342 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 343 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 344 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 345 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 346 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 347 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 348 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 349 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 350 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 351 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.b
Packet Pg. 352 Attachment: Voucher lists (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 353 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 354 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 355 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 356 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 357 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 358 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 359 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 360 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable)
6.c
Packet Pg. 361 Attachment: Payroll Registers (3460 : Warrants - Accounts Payable) ITEM NO. 7
STAFF REPORT
DATE: FEBRUARY 1, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: BRIAN DICKINSON, PUBLIC WORKS AND UTILITY SERVICES
DIRECTOR
SUBJECT: ADOPTION OF CEQA-IS/MND FOR BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT.
RECOMMENDED ACTION
Staff recommends that the City Council take the following action:
It is recommended that the City Council adopt the California Environmental Quality Act (CEQA) Initial Study/Mitigated Negative Declaration (IS/MND) for the Barton Bridge over UPRR Track Removal and Road Construction Project.
BACKGROUND
Barton Road Bridge is located between Interstate 215 and La Cadena Drive, and extends over the Union Pacific (UP) railroad right of way. Barton Road bridge is currently rated as “structurally deficient” by the California Department of Transportation (Caltrans) and in need of repairs or replacement. Since the tracks were abandoned and removed by Union Pacific Railroad Company (UPRR), it will be cost effective to remove the bridge and construct a new road. The new road will be a two lane road with bike lane and sidewalk. A joint approach to the Barton Road Bridge Replacement Project (“Project”) has been undertaken by the City of Colton and City of Grand Terrace since the physical location of the Barton Road Bridge lies within the city boundaries of both cities.
On July 12, 2017, the City received the Administering Agency - State Agreement and the Program Supplement Agreement (Preliminary Engineering Phase - Environmental and Design) for the Barton Road Bridge Removal and Road Construction Project. The Administering Agency-State Agreement identifies the State and the Local Agency’s role and responsibility on the Project. The Program Supplement Agreement identifies the funding commitment and 7 Packet Pg. 362
Staff Report to the Mayor and City Council
CEQA - Barton Road Bridge Removal and Road Construction Project February 1, 2022
responsibility for the State and Local Agency. The Project will receive a total of $3,153,863 from Federal Fund - Highway Bridge Program (HBP). The local match required is $408,617 (11.47%) and will be shared equally by Colton and Grand Terrace. A Cooperative Agreement for the Project between the City of Colton and the City of Grand Terrace was approved by the City Council on September 5, 2017. The Cooperative Agreement identifies the funding commitment, and the tasks, role and responsibilities for the development and construction of the Project. The City of Colton is the Lead Agency for the Project.
ISSUES/ANALYSIS
On April 16, 2019, the City awarded a contract to CNS Engineers, Inc. for the preparation of environmental documents, engineering design and right of way support for the Barton Road Bridge Removal and Road Construction Project. The project plan prepared by CNS Engineers, Inc. is attached as Exhibit A and environmental technical studies are completed already. The National Environmental Protection Agency (NEPA) Categorical Exclusions documents were approved by Caltrans on 8/18/2021 (Exhibit B).
The Project’s California Environmental Quality Act (CEQA) Initial Study/Mitigated Negative Declaration (IS/MND) document (Exhibit C) was circulated on July 19, 2021 and closed for review on August 18, 2021 for the 30-day public review process. Only one comment letter was received on the process. The letter was sent by Elsinore Valley Municipal Water District (EVMWD) due to their concern on their existing water lines and well site near the vicinity of bridge removal and road construction project. City and EVMWD staff, and City design and environmental consultants met on 11/4/21 to discuss and resolve the water district comments.
The letter and responses to the comments was incorporated as Appendix H of the IS/MND documents.
The City needs to adopt the IS/MND to complete the environmental phase for the Barton Road Bridge Removal and Road Construction Project. The project will proceed to the right of way phase after the completion of the environmental phase. Construction of the project is estimated to be completed by December 2024.
FISCAL IMPACTS
No fiscal impact for this action.
ENVIRONMENTAL IMPACTS
Adoption of IS/MND will complete the California Environmental Quality Act (CEQA) process for this project. National Environmental Protection Agency (NEPA) process for this Project was completed on 8/18/2021.
ALTERNATIVES
7 Packet Pg. 363
Staff Report to the Mayor and City Council
CEQA - Barton Road Bridge Removal and Road Construction Project February 1, 2022
1. Provide alternative direction to staff.
ATTACHMENT
1. Exhibit A - Barton Bridge Project Pan
2. Exhibit B - 5065(024) Signed NEPA CE 8.18.21
3. Exhibit C_Part1 - Barton Road Bridge Removal ISMND
4. Exhibit C_Part2 - Barton Road Bridge Removal ISMND
7 Packet Pg. 364
7.a
Packet Pg. 365
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) 100
% PLANS
BRIDGE N
O. 54C0379
1337-1 9
7.a
Packet Pg. 366
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) 100% PLANS
BRIDGE NO. 54C0379
1137-1 9
7.a
Packet Pg. 367
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) 100% PLANS
BRIDGE NO. 54C0379
1337-1 9
7.a
Packet Pg. 368
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) 100% PLAN
S
BRIDGE NO. 54C0379
1337-1 9
7.a
Packet Pg. 369
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CITY OF COLTON
Know what's STREET IMPROVEMENT PLAN
PUBLIC WORKS DEPARTMENT
NOTE:
THE CONTRACTOR SHALL VERIFY ALL
CONTROLLING FIELD DIMENSIONS BEFOREORDERING OR FABRICATING ANY MATERIAL. 41660 IVY STREET, SUITE A, MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
100% PLANS
BRIDGE NO. 54C0379
1337-1 9
7.a
Packet Pg. 370
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CITY OF COLTON
Know what's STREET IMPROVEMENT PLAN
PUBLIC WORKS DEPARTMENT
NOTE:
THE CONTRACTOR SHALL VERIFY ALL
CONTROLLING FIELD DIMENSIONS BEFOREORDERING OR FABRICATING ANY MATERIAL. 41660 IVY STREET, SUITE A, MURRIETA, CA 92562
PH. 951.304.9552 FAX 951.304.3568
Engineering & Consulting, Inc.
100% PLANS
BRIDGE NO. 54C0379
1337-1 9
7.a
Packet Pg. 371
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) 25'-6"± 1'-0"±
15'-9"± 9'-9"±
1'-0"±
4'-0"±
ABDN
SW
90100110120130 35'-5"± 34'-0"± 38'-0"± 34'-0"± 35'-4"±
176'-9"±
DATUM Elev 85.00
27'-6"±
CITY OF COLTON
Know what's below.
Call before you dig.
11870 Pierce Street, Suite 265
Riverside, CA 92505
Phone: 951-687-1005
Fax: 951-667-3387
Engineers IncPUBLIC WORKS DEPARTMENT
65% PLANS
NOT FOR CONSTRUCTION
NOTE:
THE CONTRACTOR SHALL VERIFY ALL
CONTROLLING FIELD DIMENSIONS BEFOREORDERING OR FABRICATING ANY MATERIAL.
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT FEDERAL PROJECT NO. BRLS-5065(024)
BRIDGE REMOVAL PLAN
TYPICAL SECTION
1" = 5'
PLAN
1" = 20'
LEGEND:
NOTES:
1. All dimensions shown are approximate. The Contractor shall verify all controlling field dimensions before
ordering or fabricating any material.
2. For as-built information not shown, see As-built Plans (Br. No. 57C0379).
3. See "ROAD PLANS" for utility information not shown.
Exist Structure
Bridge Removal
ELEVATION
1" = 20'
REMOVE Exist RW
Typ
ORIGINAL STRUCTURE
(Br No. 54C0379)
WIDENED
(Br No. 54C0379)
FG
28'-3"± 28'-3"±
21'-6"± 21'-6"±
FG
REMOVE Exist RETAINING WALLNOT SHOWN, SEE "ROAD PLANS" REMOVE Exist RETAINING WALL NOT SHOWN, SEE "ROAD PLANS" BB 34+92.51 ±
Elev 979.14 ±
EB 36+69.26 ±Elev 978.98 ±
BB EB
CIP/RC DECK WITH
AC OVERLAY
ROLLED STEEL BEAM
Typ
STEEL COLUMN BENT, Typ
100% PLANS
1337-1 8 9
7.a
Packet Pg. 372
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CITY OF COLTON
Know what's below.
Call before you dig. SIGNING & STRIPING
PUBLIC WORKS DEPARTMENT
10 SS-01
65% PLANS
NOT FOR CONSTRUCTION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT FEDERAL PROJECT NO. BRLS-5065(024) Ontario, California 91764 3190 C. Shelby Street Tel: (909) 890-9693 Fax: (909) 890-9694
BARTON ROAD
PARKING
TIME
ANY
NO
'0&
$')+0
S. Terrace Ave
S. Terrace Ave Commercial Dwy
Grand Terrace Rd
BARTON ROAD
9 X
100% PLANS
BRIDGE NO. 54C0379
# 1337-1 9 9
7.a
Packet Pg. 373
Attachment: Exhibit A - Barton Bridge Project Pan (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM (rev. 04/2021)
Project Information
Project Name (if applicable): Barton Rd over UPRR Br Removal DIST-CO-RTE: 08-SBd-Colton PM/PM: N/A
EA: N/A Federal-Aid Project Number: BRLS 5065(024)
Project Description
The Cities of Colton and Grand Terrace, in the County of San Bernardino, propose to replace the existing 2-lane bridge (BR No. 54C0379) over the abandoned alignment of the Union Pacific RR with a two-lane at-grade asphalt roadway. Work includes construction of ADA curb ramps, sidewalk and Class II bike land on the north side of the bridge, driveway approaches, remove retaining walls, cut and fill and utility relocation.
The project is in need because the bridge is structurally deficient and does not account for seismic loading. The purpose of the project is to provide safe connectivity between La Cadena and the Barton Rd/I-215 IC. The project will require approx. 12 temporary construction easements and 1 partial acquisition.
Caltrans CEQA Determination (Check one)
☒ Not Applicable – Caltrans is not the CEQA Lead Agency ☐ Not Applicable – Caltrans has prepared an IS or EIR under CEQA Based on an examination of this proposal and supporting information, the project is:
☐ Exempt by Statute. (PRC 21080[b]; 14 CCR 15260 et seq.) ☐ Categorically Exempt. Class _. (PRC 21084; 14 CCR 15300 et seq.) ☐ No exceptions apply that would bar the use of a categorical exemption (PRC 21084 and 14 CCR 15300.2). See the SER Chapter 34 for exceptions. ☐ Covered by the Common Sense Exemption. This project does not fall within an exempt class, but it can be seen with certainty that there is no possibility that the activity may have a significant effect on the environment (14 CCR 15061[b][3].) Senior Environmental Planner or Environmental Branch Chief
N/A N/A N/A
Print Name Signature Date
Project Manager
N/A N/A N/A
Print Name Signature Date
7.b
Packet Pg. 374 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 2 of 9
Federal-Aid Project Number: BRLS 5065(024)
Caltrans NEPA Determination (Check one)
☐ Not Applicable
Caltrans has determined that this project has no significant impacts on the environment as defined by NEPA, and that there are no unusual circumstances as described in 23 CFR 771.117(b). See SER Chapter 30 for unusual circumstances. As such, the project is categorically excluded from the requirements to prepare an EA or EIS under NEPA and is included under the following:
☒ 23 USC 326: Caltrans has been assigned, and hereby certifies that it has carried out the responsibility to make this determination pursuant to 23 USC 326 and the Memorandum of Understanding dated April 18, 2019, executed between FHWA and Caltrans. Caltrans has determined that the project is a Categorical Exclusion under:
☒ 23 CFR 771.117(c): activity (c)(28)
☐ 23 CFR 771.117(d): activity (d)(_)
☐ Activity _ listed in Appendix A of the MOU between FHWA and Caltrans ☐ 23 USC 327: Based on an examination of this proposal and supporting information, Caltrans has determined that the project is a Categorical Exclusion under 23 USC 327.
The environmental review, consultation, and any other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by Caltrans pursuant to 23 USC 327 and the Memorandum of Understanding dated December 23, 2016 and executed by FHWA and Caltrans.
Senior Environmental Planner or Environmental Branch Chief Aaron Burton
Print Name Signature Date
Project Manager/ DLA Engineer
Alberto Vergel de Dios
Print Name Signature Date
Date of Categorical Exclusion Checklist completion (if applicable): N/A Date of Environmental Commitment Record or equivalent: 6/24/2021 Briefly list environmental commitments on continuation sheet if needed (i.e., not necessary if included on an attached ECR). Reference additional information, as appropriate (e.g., additional studies and design conditions). 6/24/2021
08/18/2021
7.b
Packet Pg. 375 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 3 of 9
Federal-Aid Project Number: BRLS 5065(024)
Continuation sheet:
The following studies, checklists and exemptions were prepared during the environmental phase of the project:
• Preliminary Environmental Studies Form: approved 12/12/2019 • Traffic Study: approved 6/25/2020
• Noise Memo: approved 2/24/21
• NADR: Not required per Noise Memo 2/24/21
• AQ Checklist: approved 11/20/2019
• Initial Site Assessment: approved 8/4/2020
• Natural Environment Study (Minimal Impact): approved 9/23/2020 • Area of Potential Effect Map: approved 5/24/2021
• Historic Property Survey Report: approved 5/24/2021
• Archaeological Survey Report: approved 5/24/2021
• Historic Resource Evaluation Report: approved 5/24/2021 Avoidance Measures:
Air Quality
AQ-1: Prior to the commencement of any construction activities, the construction contractor shall submit a Construction Emission Control Plan for review and approval to the City of Colton Department of Public Works, which shall be implemented during construction. The Construction Emissions Control Plan shall comply with federal, State, and local regulations as specified in the measures below:
• The contractor shall adhere to the Caltrans Standard Specifications for Construction, Sections 14.9-01, 14.9-02, 14.9-03, 18-1.02C, and 18-1.03 (or Greenbook equivalent specifications). Section 14-9-02 specifically requires compliance by the contractor with all applicable laws and regulations related to air quality, including air pollution control district and air quality management district regulations and local ordinances.
• Water or a dust palliative shall be applied to the site and equipment as often as necessary to control fugitive dust emissions. Fugitive emissions generally must meet a “no visible dust” criterion either at the point of emissions or at the right-of-way line depending on local regulations in compliance with the SCAQMD Rule 403 (Fugitive Dust).
• Soil binder shall be spread on any unpaved roads used for construction purposes, and on all project construction parking areas (providing an estimated 50 percent reduction of fugitive emissions) in compliance with the SCAQMD Rule 403 (Fugitive Dust).
• Trucks shall be washed as they leave the right-of-way as necessary to control fugitive dust emissions in compliance with the SCAQMD Rule 403 (Fugitive Dust).
7.b
Packet Pg. 376 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 4 of 9
Federal-Aid Project Number: BRLS 5065(024)
• Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low-sulfur fuel as required by California Code of Regulations (CCR) Title 17, Section 93114.
• A dust control plan shall be developed documenting sprinkling, temporary paving, speed limits, and timely revegetation of disturbed slopes as needed to minimize construction impacts to existing communities in compliance with the SCAQMD Rule 403 (Fugitive Dust).
• Equipment and material storage sites shall be located as far away from residential uses as practicable. Construction areas shall be kept clean and orderly in compliance with the SCAQMD Rule 402 (Nuisance).
• Within 500 feet of sensitive air receptors, construction activities involving the extended idling of diesel equipment or vehicles will be prohibited to the extent feasible [as required by CCR Title 13, Section 2485(c)]. • Track-out reduction measures shall be used, such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic, in accordance with the State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4).
• All transported loads of soils and wet materials shall be covered before transport, or adequate freeboard (space from the top of the material to the top of the truck) shall be provided to minimize emission of dust during transportation in compliance with the SCAQMD Rule 403.
• Dust and mud that are deposited on paved, public roads due to construction activity and traffic shall be promptly and regularly removed to reduce PM emissions [State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4)].
• To the extent feasible, construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times (consistent with the traffic control plan approved by the City of Colton Traffic Engineer).
Mulch shall be installed or vegetation planted as soon as practical after grading to reduce windblown PM in the area. Note that certain methods of mulch placement, such as straw blowing, may themselves cause dust and visible emission issues and may require controls such as dampened straw [Caltrans Standard Specifications for Construction, Sections 18.1-02C (Dust Control Binders) and 18-1.03 (Construction – Dust Palliatives) or Greenbook equivalent].
Biological Resources
BIO-1: Prior to construction, an approved bat biologist shall be retained by the Project proponent to conduct a bat assessment survey to determine the presence or absence of bat species that may occur within the Project limits. Should the presence of bat species be determined during this assessment, the following measures shall be implemented:
• Nighttime exit counts and acoustic surveys shall be performed by a qualified bat biologist at all structures and palm trees that may be subject to project-related impacts.
These surveys shall be performed during the recognized bat maternity season (April
7.b
Packet Pg. 377 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 5 of 9
Federal-Aid Project Number: BRLS 5065(024)
1 through August 31, but preferably in June or July) and as far in advance of construction as possible in order to provide adequate time for mitigation planning. • Construction activities at structures housing maternity colonies shall be coordinated with an approved bat biologist and CDFW.
• If direct impacts to bat-roosting habitat are anticipated, humane evictions and exclusions of roosting bats shall be performed under the supervision of an approved bat biologist after August 31 in the fall (September or October) prior to any work activities that would result in direct impacts or direct mortality to roosting bats. This action shall be performed in coordination with the CDFW. To avoid potential mortality of flightless juvenile bats, evictions and exclusions of bats cannot be performed during the maternity season (April 1 through August 31). Winter months are also inappropriate for bat eviction because not all individuals in a roost will emerge on any given night. In addition, long-distance movements to other roost sites are more difficult during the winter when prey availability is scarce, resulting in high mortality rates of evicted bats.
• Alternative bat-roosting habitat structures shall be installed on the structures prior to the eviction/exclusion of bats from that structure. The design, numbers, and locations of these roost structures shall be determined in consultation with an approved bat biologist.
• If permanent, direct impacts to bat-roosting habitat are anticipated and a humane eviction/exclusion is performed, alternative permanent roosting habitat shall be provided to ensure no net loss of bat-roosting habitat. This action shall be coordinated with the CDFW, and locations of these roost structures shall be determined in consultation with an approved bat biologist to ensure that the installed habitat provides adequate mitigation for impacts.
• The loss of a night roost can negatively affect the use of a foraging area, and consequently may result in reduced fecundity in species that are already slow to reproduce. If night roosting is confirmed at any of the structures within the proposed Project area, the following measure to minimize potential impacts to night-roosting and foraging bats shall be implemented:
o At structures where night roosting is suspected or confirmed, work shall be limited to the daylight hours to the greatest extent feasible to avoid potential disruption of foraging. If night work cannot be avoided, night lighting shall be focused only on the area of direct work, airspace access to and from the roost features of the structure shall not be obstructed, and light spillover into the adjacent foraging areas shall be minimized to the greatest extent feasible.
BIO-2: Prior to construction, an approved bat biologist shall be retained by the Project proponent to conduct a bat assessment survey to determine the presence or absence of bat species that may occur within the Project limits. Should the presence of bat species be determined during this assessment, the following measures shall be implemented:
7.b
Packet Pg. 378 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 6 of 9
Federal-Aid Project Number: BRLS 5065(024)
• Nighttime exit counts and acoustic surveys shall be performed by a qualified bat biologist at all structures and palm trees that may be subject to project-related impacts.
These surveys shall be performed during the recognized bat maternity season (April 1 through August 31, but preferably in June or July) and as far in advance of construction as possible in order to provide adequate time for mitigation planning. • Construction activities at structures housing maternity colonies shall be coordinated with an approved bat biologist and CDFW.
• If direct impacts to bat-roosting habitat are anticipated, humane evictions and exclusions of roosting bats shall be performed under the supervision of an approved bat biologist after August 31 in the fall (September or October) prior to any work activities that would result in direct impacts or direct mortality to roosting bats. This action shall be performed in coordination with the CDFW. To avoid potential mortality of flightless juvenile bats, evictions and exclusions of bats cannot be performed during the maternity season (April 1 through August 31). Winter months are also inappropriate for bat eviction because not all individuals in a roost will emerge on any given night. In addition, long-distance movements to other roost sites are more difficult during the winter when prey availability is scarce, resulting in high mortality rates of evicted bats.
• Alternative bat-roosting habitat structures shall be installed on the structures prior to the eviction/exclusion of bats from that structure. The design, numbers, and locations of these roost structures shall be determined in consultation with an approved bat biologist.
• If permanent, direct impacts to bat-roosting habitat are anticipated and a humane eviction/exclusion is performed, alternative permanent roosting habitat shall be provided to ensure no net loss of bat-roosting habitat. This action shall be coordinated with the CDFW, and locations of these roost structures shall be determined in consultation with an approved bat biologist to ensure that the installed habitat provides adequate mitigation for impacts.
• The loss of a night roost can negatively affect the use of a foraging area, and consequently may result in reduced fecundity in species that are already slow to reproduce. If night roosting is confirmed at any of the structures within the proposed Project area, the following measure to minimize potential impacts to night-roosting and foraging bats shall be implemented:
o At structures where night roosting is suspected or confirmed, work shall be limited to the daylight hours to the greatest extent feasible to avoid potential disruption of foraging. If night work cannot be avoided, night lighting shall be focused only on the area of direct work, airspace access to and from the roost features of the structure shall not be obstructed, and light spillover into the adjacent foraging areas shall be minimized to the greatest extent feasible.
7.b
Packet Pg. 379 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 7 of 9
Federal-Aid Project Number: BRLS 5065(024)
Cultural
CR-1: If buried cultural resources are encountered during Project Activities, it is Caltrans policy that work stop in that area until a qualified archaeologist can evaluate the nature and significance of the find.
CR-2: In the event that human remains are found, the county coroner shall be notified and ALL construction activities within 60 feet of the discovery shall stop. Pursuant to Public Resources Code Section 5097.98, if the remains are thought to be Native American, the coroner will notify the Native American Heritage Commission (NAHC) who will then notify the Most Likely Descendent (MLD). The person who discovered the remains will contact the District 8 Division of Environmental Planning; Andrew Walters, DEBC: (909)383-2647. Further provisions of PRC 5097.98 are to be followed as applicable.
CR-3: If deposits of prehistoric or historical archaeological materials are discovered during non-monitored Project activities, all work within 25 feet of the discovery shall be redirected and a qualified archaeologist contacted, if one is not present, to assess the situation, consult with agencies as appropriate, and make recommendations for the treatment of the discovery. The City of Colton and Grand Terrace shall also be notified.
Project personnel shall not collect or move any archaeological materials uncovered by construction activities.
Any adverse impacts to the finds shall be avoided by Project construction activities. If avoidance is not feasible, the archaeological deposits shall be evaluated to determine if they qualify as a historical resource or unique archaeological resource, or as historic property. If the deposits do not so qualify, avoidance is not necessary. If the deposits do so qualify, adverse impacts on the deposits shall be avoided, or such impacts shall be mitigated. Mitigation may consist of, but is not limited to, recovery and analysis of the archaeological deposit; recording the resource; preparing a report of findings; and accessioning recovered archaeological materials at an appropriate curation facility.
Educational public outreach may also be appropriate. Upon completion of the assessment, the archaeologist shall prepare a report documenting the methods and results, and provide recommendations for the treatment of the archaeological deposits discovered. The report shall be submitted to the City of Colton and City of Grand Terrace.
TCR-1: In the event that cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period. Additionally, the San Manuel Band of Mission Indians Cultural Resources Department (SMBMI) shall be contacted, as detailed within TCR-2, regarding any pre-contact and/or historic-era finds and be provided information after the archaeologist makes his/her initial assessment of the nature of the find, so as to provide Tribal input with regard to significance and treatment.
7.b
Packet Pg. 380 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 8 of 9
Federal-Aid Project Number: BRLS 5065(024)
If significant pre-contact and/or historic-era cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to SMBMI for review and comment, as detailed within TCR-2. The archaeologist shall monitor the remainder of the project and implement the Plan accordingly.
If human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the project.
TCR-2: The San Manuel Band of Mission Indians Cultural Resources Department (SMBMI) shall be contacted if any pre-contact and/or historic-era cultural resource(s) are discovered during project implementation and be provided information regarding the nature of the find, so as to provide Tribal input with regard to significance and treatment.
Should the find be deemed significant, as defined by CEQA (as amended, 2015), a cultural resources Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with SMBMI, and all subsequent finds shall be subject to this Plan.
Should SMBMI elect to place a monitor on site, this Plan shall allow for a monitor to be present that represents SMBMI for the remainder of the project.
Any and all Archaeological or cultural documents created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to SMBMI. The Lead Agency and/or applicant shall, in good faith, consult with SMBMI throughout the life of the project.
GEO-1: Prior to issuance of grading permits, the City of Colton shall verify that the following note is included on the construction plans:
“If paleontological resources are encountered during the course of ground disturbance, work within 60 feet of the find shall be halted and an exclusionary buffer shall be established. A paleontologist shall be contacted to assess the find for scientific significance. No ground-disturbing activity within the 60-foot exclusionary buffer may occur without the consent of the paleontologist and the City of Colton. If determined to be significant, the fossil(s) shall be collected from the field. The paleontologist may also make recommendations regarding additional mitigation measures, such as paleontological monitoring. Scientifically significant resources shall be prepared to the point of identification, identified to the lowest taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. If scientifically significant paleontological resources are collected, a report of findings shall be prepared to document the collection.”
HAZ-1: Prior to the commencement of Project construction, a soil management plan shall be developed to identify the appropriate and applicable procedures to be followed with respect to worker health and safety during future excavations and construction activities in areas of potential soil impacts.
7.b
Packet Pg. 381 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project)
CEQA EXEMPTION / NEPA CATEGORICAL EXCLUSION
DETERMINATION FORM
EA: N/A Page 9 of 9
Federal-Aid Project Number: BRLS 5065(024)
The soil management plan shall detail the appropriate and applicable local, State, and federal regulations regarding the proper characterization, treatment, and/or disposal of any impacted soils encountered during excavation or construction activities. Any impacted soil encountered shall be appropriately handled pursuant to the project soil management plan.
HAZ-2: During construction, the Project contractor shall comply with the occupational Safety and Health Administration Standard 1926.6 related to lead abatement, and all other applicable state and federal requirements for handling and disposal of LBP, ACM, and universal wastes. AS ACM, LBP and chromium has been detected in features existing on the Project site, these materials, during Project construction, shall be abated and removed from the site in accordance with all applicable regulations, including Occupational Safety and Health Administration requirements. The City of Colton shall verify that the abatement and removal of ACM, LBP and chromium has been completed prior to any development activities on the Project site.
Permits
N/A
7.b
Packet Pg. 382 Attachment: Exhibit B - 5065(024) Signed NEPA CE 8.18.21 (3479 : CEQA - Barton Road Bridge Removal and Road Construction Project) July 2021
INITIAL STUDY / MITIGATED NEGATIVE
DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT
CITY OF COLTON/CITY OF GRAND TERRACE
SAN BERNARDINO COUNTY, CALIFORNIA
7.c
Packet Pg. 383 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 384 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction July 2021
INITIAL STUDY/MITIGATED NEGATIVE
DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT
CITY OF COLTON/CITY OF GRAND TERRACE
SAN BERNARDINO COUNTY, CALIFORNIA
Prepared for:
City of Colton
Public Works Department
1160 South 10th Street
Colton, California 92324
Prepared by:
LSA Associates, Inc.
1500 Iowa Avenue, Suite 200
Riverside, California 92507
LSA Project No. CNS1901
7.c
Packet Pg. 385 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 386 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT i
TABLE OF CONTENTS
TABLE OF CONTENTS...................................................................................................................................... i FIGURES .................................................................................................................................................. ii TABLES .................................................................................................................................................. ii APPENDICES............................................................................................................................................ ii ACRONYMS AND ABBREVIATIONS ................................................................................................................ v
1.0 INTRODUCTION AND PURPOSE.............................................................................................................. 1
1.1 INTRODUCTION ......................................................................................................................... 1
1.2 PURPOSE.................................................................................................................................... 1
1.3 INTENDED USE OF THIS INITIAL STUDY ..................................................................................... 2
1.4 PUBLIC REVIEW OF THE INITIAL STUDY..................................................................................... 2
2.0 PROJECT DESCRIPTION........................................................................................................................... 3
2.1 PROJECT LOCATION................................................................................................................... 3
2.2 LAND USE................................................................................................................................... 3
2.3 PROJECT DESCRIPTION.............................................................................................................. 3
2.4 METHODOLOGY......................................................................................................................... 5
2.5 REQUIRED PERMITS AND APPROVALS ...................................................................................... 5
2.6 INITIAL STUDY APPENDICES....................................................................................................... 5
3.0 INITIAL STUDY CHECKLIST..................................................................................................................... 13 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED ......................................................................... 14 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)............................................................ 15 EVALUATION OF ENVIRONMENTAL IMPACTS...................................................................................... 16
3.1 AESTHETICS.............................................................................................................................. 17
3.2 AGRICULTURAL RESOURCES.................................................................................................... 20
3.3 AIR QUALITY ............................................................................................................................ 23
3.4 BIOLOGICAL RESOURCES......................................................................................................... 31
3.5 CULTURAL RESOURCES............................................................................................................ 36
3.6 ENERGY.................................................................................................................................... 39
3.7 GEOLOGY AND SOILS............................................................................................................... 41
3.8 GREENHOUSE GAS EMISSIONS................................................................................................ 46
3.9 HAZARDS AND HAZARDOUS MATERIALS ................................................................................ 49
3.10 HYDROLOGY AND WATER QUALITY ........................................................................................ 55
3.11 LAND USE AND PLANNING ...................................................................................................... 64
7.c
Packet Pg. 387 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT ii
3.12 MINERAL RESOURCES.............................................................................................................. 65
3.13 NOISE....................................................................................................................................... 66
3.14 POPULATION AND HOUSING................................................................................................... 72
3.15 PUBLIC SERVICES ..................................................................................................................... 73
3.16 RECREATION............................................................................................................................ 76
3.17 TRANSPORTATION................................................................................................................... 77
3.18 TRIBAL CULTURAL RESOURCES................................................................................................ 82
3.19 UTILITIES AND SERVICE SYSTEMS............................................................................................ 86
3.20 WILDFIRE ................................................................................................................................. 89
3.21 MANDATORY FINDINGS OF SIGNIFICANCE ............................................................................. 92
4.0 REFERENCES ......................................................................................................................................... 95
5.0 MITIGATION MONITORING AND REPORTING PROGRAM.................................................................... 99
5.1 MANDATORY FINDINGS OF SIGNIFICANCE ............................................................................. 99
5.2 STANDARD CONDITIONS ......................................................................................................... 99
FIGURES
Figure 1: Regional Location........................................................................................................................... 7 Figure 2: Project Location ............................................................................................................................. 9 Figure 3: Project Design .............................................................................................................................. 11 TABLES
Table 2.2.A: On-site and Adjacent Land Uses............................................................................................... 3 Table 3.3.A: Maximum Daily Project Construction Emissions.................................................................... 25 Table 3.3.B: Opening Year (2023) and Horizon Year (2045) Regional Vehicle Emissions........................... 27 Table 3.8.A: Construction Greenhouse Gas Emissions............................................................................... 47 Table 3.8.B: Modeled Annual CO2 Emissions and VMT .............................................................................. 47 Table 3.10.A: General Best Management Practices ................................................................................... 56 Table 3.10.B: Pre-Project Condition Peak Flow Rate for Drainage Area..................................................... 57 Table 3.10.C: Post-Project Condition Peak Flow Rate for Drainage Area................................................... 58 Table 3.13.A: Typical Maximum Construction Equipment Noise Levels (Lmax) ........................................... 68 Table 3.13.B: Vibration Source Amplitudes for Construction Equipment.................................................. 70 Table 3.13.C: Vibration Source Amplitudes for Construction Equipment.................................................. 71 Table 3.17.A: Opening Year (2023) and Horizon Year (2045) Intersection LOS.......................................... 79
APPENDICES
A: AIR QUALITY REPORT
B: NATURAL ENVIRONMENT STUDY MINIMAL IMPACTS (NESMI)
C: HISTORIC PROPERTY SURVEY REPORT (HPSR) AND ARCHAEOLOGICAL SURVEY REPORT (ASR) D: INITIAL SITE ASSESSMENT, SUPPLEMENTAL HAZARDOUS MATERIALS SURVEY REPORT, LIMITED SITE
INVESTIGATION AND ADL REPORT
7.c
Packet Pg. 388 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT iii
E: DRAINAGE STUDY
F: NOISE MEMORANDUM
G: TRAFFIC IMPACT ANALYSIS
H: RESPONSES TO PUBLIC COMMENTS RECEIVED
7.c
Packet Pg. 389 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT iv
THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 390 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT v
ACRONYMS AND ABBREVIATIONS
AB Assembly Bill
ACM asbestos-containing material
ADL Aerially Deposited Lead
APN Assessor’s Parcel Number
AQMP Air Quality Management Plan
Basin South Coast Air Basin
BACMs Best Available Control Measures
bgs below ground surface
BMP Best Management Practice
CalEEMod California Emission Estimator Model
CalRecycle California Department of Resources Recycling and Recovery Caltrans California Department of Transportation
CARB California Air Resources Board
CCR California Code of Regulations
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CEQA Guidelines State of California Guidelines for Implementation of the California Environmental Quality Act cfs cubic feet per second
City City of Colton
CO Carbon Monoxide
CO2 Carbon Dioxide
CO2e Carbon Dioxide Equivalent
CWA Federal Clean Water Act
dBA A-weighted decibel
DTSC Department of Toxic Substances Control
EIR Environmental Impact Report
EMFAC Emission Factors
EPA (United States) Environmental Protection Agency
FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
FTA Federal Transit Administration
FTIP Federal Transportation Improvement Program
GHG Greenhouse Gas
in/sec inches per second
IS Initial Study
ISA Initial Site Assessment
LBP lead-based paint
7.c
Packet Pg. 391 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT vi
LID Low Impact Development
Lmax Maximum Noise Level
LOS Level of Service
LRA Local Responsibility Area
MMRP Mitigation Monitoring and Reporting Program
MND Mitigated Negative Declaration
mph miles per hour
MS4 Municipal Separate Storm Sewer System
MT CO2e Metric Ton Carbon Dioxide Equivalent
ND Negative Declaration
NO2 nitrogen dioxide
NOI Notice of Intent
NOx nitrogen oxide
NPDES National Pollutant Discharge Elimination System
PCE passenger car equivalent
PM10 respirable particulate matter
PM2.5 fine particulate matter
PPV peak particle velocity
PRC Public Resources Code
REC recognized environmental conditions
RHWC Riverside Highland Water Company
RL Report Limit
RTP/SCS Regional Transportation Plan/Sustainable Communities Strategy RWQCB Regional Water Quality Control Board
SB Senate Bill
SC Standard Conditions
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SCE Southern California Edison
SMBMI San Manuel Band of Mission Indians Cultural Resources Department STLC Soluble Threshold Limit Concentration
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TPH Total Petroleum Hydrocarbon
TPH-DRO Total Petroleum Hydrocarbon, Diesel Range Organics TPH-MORO Total Petroleum Hydrocarbon, Motor Oil Range Organics TSR Traffic Study Report
TTLC Total Threshold Limit Concentration
UPRR Union Pacific Railroad
7.c
Packet Pg. 392 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT vii
USGS United States Geological Survey
UWMP Urban Water Management Plan
VdB vibration velocity decibels
VHFHSZ Very High Fire Hazard Severity Zone
VMT Vehicle Miles Traveled
VOC Volatile Organic Compounds
WQMP Water Quality Management Plan
7.c
Packet Pg. 393 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT viii
THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 394 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 1 1.0 INTRODUCTION AND PURPOSE
1.1 INTRODUCTION
Section 1.0 of this Initial Study (IS) describes the purpose, environmental authorization, the intended uses of the IS, documents incorporated by reference, and the processes and procedures governing the preparation of the environmental document. Pursuant to Section 15367 of the State of California Guidelines for Implementation of the California Environmental Quality Act (CEQA Guidelines), the City of Colton (City) is the Lead Agency under the California Environmental Quality Act (CEQA). The City has primary responsibility for compliance with CEQA and consideration of the Barton Road Bridge Removal and Road Construction Project (“Project” or “proposed Project”).
The Initial Study is organized as follows:
Section 1.0 Introduction and Purpose provides a discussion of the Initial Study’s purpose, focus, and legal requirements.
Section 2.0 Project Description provides a detailed description of the proposed Project.
Section 3.0 Environmental Checklist includes a checklist and accompanying analyses of the Project’s effect on the environment. For each environmental issue, the analysis identifies the level of Project’s environmental impact.
Section 4.0 References details the references cited throughout the document.
Appendices Includes the technical material prepared to support the analyses contained in the IS.
1.2 PURPOSE
CEQA requires that the proposed Project be reviewed to determine the environmental effects that would result if the Project were approved and implemented. The City is the Lead Agency and has the responsibility of preparing and adopting the associated environmental document prior to consideration of the approval of the proposed Project. The City has the authority to make decisions regarding discretionary actions relating to implementation of the proposed Project.
This IS has been prepared in accordance with the relevant provisions of CEQA (California Public Resources Code Section 21000 et seq.); the CEQA Guidelines,1 and the rules, regulations, and procedures for implementing CEQA as adopted by the City. The objective of the Initial Study is to inform City decisionmakers, representatives of other affected/responsible agencies, the public, and interested parties of the potential environmental consequences of the Project.
As established in CEQA Guidelines Section 15063(c), the purposes of an IS are to:
• Provide the Lead Agency (City of Colton) with information to use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative Declaration (ND), or Mitigated Negative Declaration (MND);
• Enable an applicant or Lead Agency to modify a project, mitigating adverse impacts before an EIR is prepared, thereby enabling the project to qualify for an ND or MND;
1 California Code of Regulations, Title 14, Chapter 3, Sections 15000 through 15387.
7.c
Packet Pg. 395 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 2 • Assist in the preparation of an EIR, if one is required; • Facilitate environmental assessment early in the design of a project; • Provide a factual basis for finding in an ND or MND that a project will not have a significant effect on the environment;
• Eliminate unnecessary EIRs; and
• Determine whether a previously prepared EIR could be used with the project.
1.3 INTENDED USE OF THIS INITIAL STUDY
The City formally initiated the environmental process for the proposed Project with the preparation of this Initial Study. The IS screens out those impacts that would be less than significant and do not warrant mitigation, while identifying those issues that require further mitigation to reduce impacts to a less than significant level. As identified in the following analyses, Project impacts related to various environmental issues either do not occur, are less than significant (when measured against established significance thresholds), or have been rendered less than significant through implementation of mitigation measures.
Based on these analytical conclusions, this IS supports adoption of an MND for the proposed Project.
CEQA2 permits the incorporation by reference of all or portions of other documents that are generally available to the public. The IS has been prepared utilizing information from City planning and environmental documents, technical studies specifically prepared for the Project, and other publicly available data. The documents utilized in the IS are identified in Section 4.0 and are hereby incorporated by reference. These documents are available for review at the City of Colton, Public Works Department.
1.4 PUBLIC REVIEW OF THE INITIAL STUDY
The IS and a Notice of Intent (NOI) to adopt an MND will be distributed to responsible and trustee agencies, other affected agencies, and other parties for a 20-day public review period. Written comments regarding this Initial Study should be addressed to:
Victor P. Ortiz, P.E.
City Engineer
160 S 10th Street
Colton, California 92324
(909) 370-5065
[email protected]
Consideration of comments raised during the 20-day public review period will be taken into account and addressed prior to adoption of the MND by the City.
2 CEQA Guidelines Section 15150.
7.c
Packet Pg. 396 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 3 2.0 PROJECT DESCRIPTION
2.1 PROJECT LOCATION
The Project site is located on Barton Road over the abandoned Union Pacific Rail Road (UPRR) tracks and Southern California Edison (SCE) easement between Terrace Avenue and Grand Terrace Road straddling the boundary of the Cities of Colton and Grand Terrace. Surrounding uses in the vicinity of the Project site include industrial businesses, surface parking lots, the inactive UPRR corridor and SCE easement to the north; Barton Road and single-family residential units to the east; industrial/commercial businesses, surface parking lots, undeveloped land, and the inactive UPRR corridor and SCE easement to the south; and, Barton Road, surface parking lots, and Terrace Avenue to the west. Figure 1: Regional Location and Figure 2: Project Location shows the location of the proposed Project on a regional and local basis.
2.2 LAND USE
The Project site is located on Barton Road over the inactive UPRR corridor and active SCE easement. The Project site itself does not have a land use designation nor a zoning designation. Table 2.2.A summarizes surrounding land uses, General Plan designations and zoning designations.
Table 2.2.A: On-site and Adjacent Land Uses
Direction Existing Land Use
General Plan
Designation Zoning Designation
Project Site Road/Bridge N/A N/A
North
(Colton)
Industrial Uses, Surface Parking Lots, Abandoned UPRR
tracks, SCE Easement
Light Industrial M-1 Light Industrial
North
(Grand
Terrace)
Industrial Businesses, Surface Parking Lots, Inactive UPRR Corridor and SCE Easement
Industrial Restricted
Manufacturing
East (Grand
Terrace)
Residential units and Barton Road Industrial Restricted Manufacturing
South (Colton) Industrial/Commercial Uses, Surface Parking Lots, Abandoned UPRR tracks, SCE Easement
Light Industrial M-1 Light Industrial
South
(Grand Terrace
Industrial/Commercial businesses, surface parking lot,
inactive UPRR corridor and SCE easement
Industrial Restricted
Manufacturing
West
(Colton)
Barton Road, Surface Parking Lots, and Terrace Avenue Light Industrial M-1 Light Industrial
2.3 PROJECT DESCRIPTION
The Project is being proposed to provide a safe connectivity between La Cadena and the Barton Road/Interstate-215 (I-215) interchange and to facilitate efficient access between the Cities of Colton and Grand Terrace. Barton Road Bridge was originally built in 1936 as a two-lane bridge over the UPRR railroad tracks (one lane in each direction). The bridge is structurally unsound and the 25-foot wide bridge deck does not provide adequate pedestrian or bicycle access in accordance with City standards. A review of the existing bridge’s plans shows the design does not account for seismic loading, which is now required in the state of California. The Bridge Inspection Report shows a low sufficiently rating of 58.8 due to low load rating and a roadway geometry that does not meet current American Association of State Highway and Transportation Officials standards. The railroad tracks below the Barton Road Bridge have been abandoned and removed; as such, there is no longer the need to span the railroad tracks with a bridge.
7.c
Packet Pg. 397 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 4 The Cities of Colton (CEQA Lead Agency) and Grand Terrace (Responsible Agency) in cooperation with the California Department of Transportation (Caltrans) proposes to remove the bridge (State Bridge No. 54C0379), fill the area over the railroad corridor, and replace the bridge with a two-lane at grade asphalt roadway to connect to the existing roadway to the east and west of the bridge. There is also the need to provide continuous pedestrian and bicycle access along this stretch of Barton Road through implementation of sidewalks and Class II bicycle lanes to meet the requirements of both the Cities of Colton and Grand Terrace.
Improvements to Barton Road will begin at the east side of Terrace Avenue intersection in the City of Colton and extend to approximately 100 feet west of the intersection of Grand Terrace Avenue in the City of Grand Terrace. The curb-to-curb roadway width of 44 feet widens to approximately 70 feet of west Grand Terrace Avenue to tie into the improvements that have been made to the Barton Road/I-215 interchange. The total length of the roadway improvements is approximately 1,100 feet. The roadway will accommodate a 6-foot wide sidewalk on the north and south side of Barton Road, an 8-foot wide striped Class II bicycle lane on each side of the roadway and 14-foot wide travel lanes. Land configurations transition to join existing improvements west of Grand Terrace Avenue. Improvements associated with the proposed Project include the following:
• Demolition and removal of the existing bridge, abutments, and retaining walls on Barton Road. • Remove and reconstruct the drainage outlet west of Grand Terrace Avenue; construct a drainage culvert across Barton Road in the vicinity of the abandoned tracks. • Relocate the Riverside Highland Water Company line, City waterline, fiber optic cables, and gas line in the existing bridge and roadway; relocate overhead telephone lines spanning along the north side of Barton Road.
• Cut of approximately 5,800 cubic yards and fill of approximately 4,300 cubic yards to bring the bridge area to grade.
• Construct asphalt roadway, remove the vertical crest curve improving stopping sight distance consistent with the Cities standards of Barton Road’s roadway classification. • Construct curb ramps at the intersection of Barton Road and Terrace Avenue to American Disabilities Act standards. (Note: improvements associated with planned developments in the project area will be required to match the profile of the planned Barton Road improvements.) • Construct 6-foot wide sidewalk, and 8-foot wide Class II bike lane on north and south side of Barton Road within the Project limits.
• Construct driveway approaches joining existing driveways to City of Colton and Grand Terrace standards.
• Remove a retaining wall along the north side of Baron Road right of way in front of (current) Lineage Logistics building.
• Identify and provide a construction staging area in the vicinity of the improvements. • Close Barton Road between Terrace Avenue and Grand Terrace Avenue during construction and provide a detour for traffic. The detour will route traffic around the construction zone on Barton Road via S. Terrace Avenue, De Berry Street, and S. La Crosse Avenue.
7.c
Packet Pg. 398 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 5 The proposed Project will require approximately 0.60 acre of temporary construction easements and slope easements. The majority of improvements with the exception of grading of driveways to match the lowered street elevation will be contained to the Cities’ existing right-of-way. Right-of-way acquisitions will occur on the following parcels: APNs 1167 121 06; 1167 121 07; 0275 223 24; 0275 223 58; and, 0275 223 16. Approximately 3,800 square feet will be acquired to increase the right of way at the location of the existing bridge to 50 feet in each direction plus approximately 50 square feet of permanent right of way acquisition will be needed in front of Assessors’ Parcel Number (APN) 0275-223-16 (this parcel is located within the City of Grand Terrace). Figure 3: Project Design shows the design of the proposed Project along Barton Road.
2.4 METHODOLOGY
The analysis in this IS/MND provides an environmental review of the Project pursuant to CEQA. The details of the proposed Project and associated actions have been characterized in this section and are also addressed in detail throughout Section 3.0 of this IS/MND. If the Project is approved, the Project would be allowed without further discretionary approval, so long as the improvements comply with the City’s regulations and project-specific mitigation measures and Conditions of Approval.
2.5 REQUIRED PERMITS AND APPROVALS
The City is expected to use this IS/MND in consideration of the proposed Project and associated actions.
These actions may include, but are not limited to, the following:
• City of Colton/City of Grand Terrace Public Works Department review.
2.6 INITIAL STUDY APPENDICES
The Initial Study is based on the following environmental documents and technical studies:
Appendix A: Air Quality Report
Appendix B: Natural Environment Study Minimal Impacts (NESMI) Appendix C: Historic Property Survey Report (HPSR) and Archaeological Survey Report (ASR) Appendix D: Initial Site Assessment, Supplemental Hazardous Materials Survey Report, Limited Site Investigation and ADL Report
Appendix E: Drainage Study
Appendix F: Noise Memorandum
Appendix G: Traffic Study Report
7.c
Packet Pg. 399 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 6 THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 400 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Service Layer Credits: Copyright:(c) 2014 Esri
Project Location
§¨¦10
§¨¦215
Ã210
Ã60
§¨¦215
§¨¦15
§¨¦215
§¨¦10
Ã330
Ã30
Ã60
Ã210
Ã91
Baseline Ave
Arrow Hwy
San Bernardino Ave
Merrill Ave Mill St
Reche Canyon Rd
Barton Rd
Sierra Ave
Riverside Ave
Riverside Ave
Mount Vernon Ave
Arlington Ave
Perris Blvd
La Cadena Dr
San
Bernardino
County
Riverside
County
SOURCE: Esri (2019)
I:\CNS1901\GIS\MXD\ISMND\RegionalLocation.mxd (12/2/2020) LEGEND FIGURE 1
Project Location
0 1.5 3
MILES
Barton Road Bridge Removal
and Road Construction Project
Regional Location
7.c
Packet Pg. 401 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 8 THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 402 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Service Layer Credits:
Vivienda Ave
Michigan Ave
Rosedale Ave
Earp
St
De Berry St
Litton Ave
Grand Terrace Rd
Bostick
Ave
Stonewood Dr
Merryfields Ave
Terrace Ave
Maria Ct
Burns Ave
Walnut Ave
Maple
Ave
Palm Ave
Commerce Wy
Barton Rd
La Cadena Dr
City of
Colton
City of
Grand
Terrace
§¨¦215
SOURCE: Nearmap (9/20/2019); CNS Engineering (5/19/2020 and 7/13/2020); County of San Bernardino (4/2019) I:\CNS1901\GIS\MXD\ISMND\ProjLoc_Aerial.mxd (10/14/2020) FIGURE 2
Barton Road Bridge Removal
and Road Construction Project
Project Location
0 300 600
FEET
LEGEND
Project Boundary
City Boundary
7.c
Packet Pg. 403 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 10 THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 404 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Service Layer Credits:
Terrace Ave
Grand Terrace Rd
027522344
116712104 116712102
027522327
027522362
027522324
116705102
027522358
027522322
116712107
116712108
116705115
027522326
027522325
116712106 116705118
116712103
Barton Rd
City of
Colton
City of
Grand
Terrace
LEGEND
Project Boundary
Existing Right-of-Way/Parcel Boundaries
City Boundary
Proposed Project Features
New Pavement
Curb/Gutter
Driveway
Toe of Slope
Sidewalk
Staging Area
Right-of-Way Acquisition
Slope/Drainage Easement
Temporary Construction Easement
SOURCE: Nearmap (9/20/2019); CNS Engineering (5/19/2020 and 7/13/2020); County of San Bernardino (4/2019) I:\CNS1901\GIS\MXD\ISMND\ProjectDesign.mxd (10/14/2020) FIGURE 3
Barton Road Bridge Removal
and Road Construction Project
Project Design
0 75 150
FEET
7.c
Packet Pg. 405 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 12 THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 406 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 13 3.0 INITIAL STUDY CHECKLIST
1. Project Title:
Barton Road Bridge Removal and Road Construction Project Federal AID Project No. BRLS-5065(024)
2. Lead Agency Name and Address:
City of Colton
Public Works Department
160 South 10th Street
Colton, California 92324
3. Contact Person and Phone Number:
Victor P. Ortiz, P.E., City Engineer
(909) 370-5065
[email protected]
4. Project Location:
The Project site is located on Barton Road over the abandoned Union Pacific Rail Road (UPRR) tracks and Southern California Edison (SCE) easement between Terrace Avenue and Grand Terrace Road straddling the boundary of the City of Colton and City of Grand Terrace.
5. Project Sponsor’s Name and Address:
Albert Vergel de Dios, P.E.
District Local Assistance Engineer
California Department of Transportation, District 8
464 West Fourth Street, 6th Floor
San Bernardino, California 92401
6. General Plan Designation:
Road and Bridge – No General Plan Designation
7. Zoning:
Road and Bridge – No Zoning Designation
8. Description of Project:
The Cities of Colton (CEQA Lead Agency) and Grand Terrace in cooperation with Caltrans proposes to remove the bridge (State Bridge No. 54C0379), fill the area over the UPRR railroad corridor/SCE easement, and replace the bridge with a two-lane at grade asphalt roadway to connect to the existing roadway to the east and west of the bridge. There is also the need to provide continuous pedestrian and bicycle access along this stretch of Barton Road through implementation of sidewalks and Class II bicycle lanes to meet the requirements of both the Cities of Colton and Grand Terrace. The Project boundary is approximately 2.9 acres. Please refer to Section 2.3 for further detail.
9. Setting and Surrounding Land Uses:
Surrounding uses in the vicinity of the Project site include industrial businesses, surface parking lots, the inactive UPRR corridor and SCE easement to the north; Barton Road and single-family residential units to the east; industrial/commercial businesses, surface parking lots, undeveloped land, and the
7.c
Packet Pg. 407 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 14 inactive UPRR corridor and SCE easement to the south; and, Barton Road, surface parking lots, and Terrace Avenue to the west.
10. Required Actions:
The City is expected to use this IS/MND in consideration of the bridge demolition and roadway improvements and associated actions. These actions may include, but are not limited to, the following:
• Bridge Removal Permit;
• Street Improvement Permit;
• Traffic Management Plan; and
• Encroachment Permit (City of Grand Terrace).
Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code Section 21080.3.1? If so, has consultation begun? Please refer to Checklist Section 3.18 (Tribal Cultural Resources).
Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process. (See Public Resources Code Section 21083.3.2.) Information may also be available from the California Native American Heritage Commission’s Sacred Lands File per Public Resources Code Section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation. Please also note that Public Resources Code Section 21082.3(c) contains provisions specific to confidentiality.
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a potentially significant impact as indicated by the checklist on the following pages. ☐ Aesthetics ☐ Agricultural Resources ☐ Air Quality
☐ Biological Resources ☐ Cultural Resources ☐ Energy
☐ Geology/Soils ☐ Greenhouse Gas Emissions ☐ Hazards & Hazardous Materials ☐ Hydrology/Water Quality ☐ Land Use/Planning ☐ Mineral Resources ☐ Noise ☐ Population/Housing ☐ Public Services
☐ Recreation ☐ Transportation ☐ Tribal Cultural Resources ☐ Utilities/Service Systems ☐ Wildfire ☐ Mandatory Findings of Significance
7.c
Packet Pg. 408 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 15 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)
On the basis of the initial evaluation:
☐ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
☒ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. ☐ I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
☐ I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
☐ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Signature: Date:
7.c
Packet Pg. 409 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 16 EVALUATION OF ENVIRONMENTAL IMPACTS
1. A brief explanation is required for all answers except “No Impact” answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question.
A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).
2. All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3. Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may be significant. If there are one or more “Potentially Significant Impact” entries when the determination is made, an Environmental Impact Report (EIR) is required.
4. “Negative Declaration: Less Than Significant With Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from “Earlier Analyses,” as described in (5) below, may be cross-referenced).
5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D).
In this case, a brief discussion should identify the following:
a. Earlier Analysis Used. Identify and state where they are available for review. b. Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis.
c. Mitigation Measures. For effects that are “Less than Significant with Mitigation Measures Incorporated,” describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project.
6. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated.
7. Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion.
8. This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project’s environmental effects in whatever format is selected.
9. The explanation of each issue should identify:
a. The significance criteria or threshold, if any, used to evaluate each question; and b. The mitigation measure identified, if any, to reduce the impact to less than significance.
7.c
Packet Pg. 410 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 17 3.1 AESTHETICS
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Have a substantial adverse effect on a
scenic vista?
b. Substantially damage scenic resources,
including, but not limited to trees, rock
outcroppings and historic buildings within a
state scenic highway?
c. In non-urbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point.) If the project is in an
urbanized area, would the project conflict
with applicable zoning and other regulations
governing scenic quality?
d. Create a new source of substantial light or
glare that would adversely affect daytime or
nighttime views in the area?
a. Would the project have a substantial adverse effect on a scenic vista? No Impact. Scenic and other important visual features typically include parks, natural open space and topographic features, and native flora. Views of the San Bernardino and San Gabriel Mountains form a scenic backdrop for the northern portion of the City of Colton. These vistas are shared amongst all of the cities surrounding/bordering the City of Colton and Grand Terrace. The only scenic resource within the City of Colton is the Santa Ana River and its surrounding natural areas. Views of this natural feature are accessible from the surrounding area as well as through the recreational use of the San Ana River area.
The Project site is located on Barton Road, straddling the cities of Colton and Grand Terrace boundary, in an urban area. There are no scenic vistas or important visual features within the boundary of the Project site. Motorists traveling westbound on Barton Road have views of the La Loma Hills while motorists traveling eastbound on Barton Road have semi-unobstructed views of Blue Mountain. The San Bernardino and San Gabriel Mountains and the Santa Ana River are not visible to motorists traveling through the Project site on Barton Road. The proposed Project includes the removal of an existing bridge crossing over the abandoned UPRR corridor, filling of the area and development of a new portion of Barton Road in place of the old bridge. No tall structures would be developed with the proposed Project resulting in views of the local hills being obstructed to motorists. The closest single-family residential units to the proposed Project are located along Grand Terrace Road and face predominantly to the east, away from the Project site. As such, the proposed Project would not obstruct views of the La Loma Hills and Blue Mountain.
Overall, no impact on a scenic vista would occur with implementation of the Project and no mitigation is required.
7.c
Packet Pg. 411 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 18 b. Would the project substantially damage scenic resources, including, but not limited to trees, rock outcroppings and historic buildings within a State scenic highway? No Impact. The proposed Project is not located along a State scenic highway, and there are no state scenic highways located within the Project vicinity.3 Therefore, the Project will not affect any scenic resources within a State scenic highway. No impact would occur and no mitigation is required. c. Would the project, in non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point.) If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than Significant Impact. As of July 1, 2019, the United States Census Bureau estimated the City’s population to be 52,148 persons and the City’s land area to be approximately 15.32 square miles.4 The
Project is located in an area with at least 1,000 persons per square mile (3,404 people per square mile) and therefore meets the definition of Urbanized Area under Section 15387 of the CEQA Guidelines.
During construction, the construction vehicles and equipment would be visible during the removal of existing bridge, placement of the fill, the laying of asphalt material, and other visible general construction activity (i.e., utility relocation). However, the presence of construction vehicles would be temporary and would cease once construction is complete. Due to the temporary nature of construction activities, impacts to visual character of the site and its surroundings would be less than significant during construction. No mitigation is warranted.
The major scenic resource in the City of Colton is the Santa Ana River and its surrounding natural area.
Views of the La Loma Hills (within the City) and Blue Mountain (located within the City of Grand Terrace).
The Project consists of removal of the existing bridge crossing over the abandoned UPRR corridor and replacing it with fill to allow development of road to connect Barton Road in lieu of a new bridge. The Project site itself is not zoned by the City of Colton as Barton Road is a public right-of-way owned by the two cities. Approximately 4,500 square feet will be acquired to increase the right of way at the location of the existing bridge to 50 feet in each direction plus approximately 700 square feet of permanent right of way acquisition will be needed in front of APN 027522316. This parcel is located in the City of Grand Terrace and is currently zoned as Restricted Manufacturing; however, once acquisition occurs the portion of the parcel will become right-of-way for Barton Road. While the Project will alter the existing visual condition of the site (temporarily during construction), it would not conflict with applicable zoning and other regulations governing scenic quality, and impacts to the visual character or quality of the site and its surroundings would be less than significant. No mitigation is required. d. Would the project create a new source of substantial light or glare that would adversely affect daytime or nighttime views in the area?
No Impact. Construction of the Project will be limited to between the hours of 8:00 a.m. and 8:00 p.m. on any day except Sunday or between the hours of 9:00 a.m. and 8:00 p.m. on Sunday in accordance with
3 California Scenic Highway Mapping System. San Bernardino County. California Department of Transportation. http://www.dot.ca.gov/hq/LandArch/16_livability/scenic_highways/index.htm (accessed October 5, 2020). 4 QuickFacts, Colton, City of, California. United States Census Bureau. https://www.census.gov/quickfacts/fact/table/ coltoncitycalifornia/PST045219 (accessed October 5, 2020).
7.c
Packet Pg. 412 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 19 Section 8.108.040(e) of the City of Grand Terrace Municipal Code5 Therefore, nighttime lighting during construction would not be necessary. The proposed Project does not include the installation of light standards along the Barton Road once the Project is operational. The proposed Project would not implement features (i.e., guardrails, etc.) that would increase glare in the vicinity of the Project site. No impact would occur as a result on implementation of the proposed Project and no mitigation is required.
5 The City of Colton as a lead agency under CEQA does not have regulations pertaining to construction noise. Therefore, the City of Grand Terrace construction noise regulations (including hours of construction activity) is applicable to the proposed Project.
7.c
Packet Pg. 413 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 20 3.2 AGRICULTURAL RESOURCES
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including Timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the State’s inventory of forest land, including Forest and Range Assessment Project and the Forest Legacy Assessment Project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board.
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Convert Prime Farmland, Unique Farmland,
or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and
Monitoring Program of the California
Resources Agency, to non-agricultural use?
b. Conflict with existing zoning for agricultural
use, or a Williamson Act contract?
c. Conflict with existing zoning for or cause
rezoning of forest land (as defined in Public
Resources Code section 12220(g), timberland
(as defined by Public Resources Code Section
4526) or timberland zoned Timberland
Production (as defined by Government Code
Section 51104(g))?
d. Result in the loss of forest land or conversion
of forest land to non-forest use?
e. Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of
Farmland to non-agricultural use or
conversion of forest land to non-forest use?
a. Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. The California Department of Conservation, Farmland Mapping and Monitoring Program, compiles Important Farmland maps pursuant to the provisions of Section 65570 of the California Government Code. These maps utilize data from the United States Department of Agriculture, Natural
7.c
Packet Pg. 414 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 21 Resource Conservation Service soil survey and current land use information using eight mapping categories, and they represent an inventory of agricultural resources within San Bernardino County.
No agricultural operations are located on, adjacent to, or near the proposed Project site. The proposed Project site is designated as “Urban and Built-Up Land”.6 As no Prime or Unique Farmlands or Farmland of Statewide Importance (Important Farmlands) are located within or adjacent to the proposed Project site, no conversion of such Important Farmland categories will occur. No impact related to this issue would occur and no mitigation is required.
b. Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. Williamson Act contracts restrict land development of contract lands.7 These contracts typically limit land use to agriculture, recreation, and open space, unless otherwise stated in the contract.
The City of Colton General Plan Update EIR indicates that San Bernardino County does not have any Williamson Act contracts within the City limits or within Colton’s Sphere of Influence.8 The Project site is not zoned, as it is a public roadway located in the Cities of Colton and Grand Terrace. The parcel where the proposed Project will require sliver acquisition is zoned M-1 Light Industrial. Implementation of the proposed Project would not conflict with existing zoning for agricultural use, or Williamson Act contracts.
Therefore, no impact would occur and no mitigation is required. c. Conflict with existing zoning for or cause rezoning of forest land (as defined in Public Resources Code Section 12220(g), timberland (as defined by Public Resources Code Section 4526) or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? No Impact. Neither the Project site nor surrounding properties are zoned for forest land or timberland.
Therefore, the proposed Project would have no impact on forest land or timberland. No mitigation is required.
d. Result in the loss of forest land or conversion of forest land to non-forest use? No Impact. No forest land exists on site. As discussed in response to Checklist Question 3.2c, the proposed Project would not result in the loss of forest land or conversion of forest land to non-forest use. Therefore, no impact would occur and no mitigation is required.
e. Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland to non-agricultural use or conversion of forest land to non-forest use?
No Impact. As discussed in response to Checklist Questions 3.2a and 3.2b, no agricultural operations are located on, adjacent to, or near the proposed Project. The Project site is designated as “Urban and BuiltUp Land” by the Farmland Mapping and Monitoring Program and it is not subject to a Williamson Act Contract. Land surrounding the Project site is occupied by urban uses and is zoned as M-1 Light Industrial.
6 San Bernardino County Important Farmland 2016. State of California Department of Conservation, DLRP Data Downloads. https://gis.conservation.ca.gov/portal/home/group.html?id=b1494c705cb34d01acf78f4927a75b8f#overview (accessed October 6, 2020). 7 The Williamson Act is a procedure authorized under State law to preserve agricultural lands as well as open space. Property owners entering into a Williamson Act contract receive a reduction in property taxes in return for agreeing to protect the land’s open space or agricultural values. 8 City of Colton, City of Colton General Plan Update Environmental Impact Report, Section 4.2 Agricultural and Forest Resources, pg. 4.2-6, May 2013.
7.c
Packet Pg. 415 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 22 Similarly, no forestry uses exist on or near the Project site. In the absence of land designated for agricultural or forestry use, no impact would occur and no mitigation is required.
7.c
Packet Pg. 416 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 23 3.3 AIR QUALITY
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Conflict with or obstruct implementation of
the applicable air quality plan?
b. Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non-attainment under
an applicable federal or State ambient air
quality standard?
c. Expose sensitive receptors to substantial
pollutant concentrations?
d. Result in other emissions (such as those
leading to odors) adversely affecting a
substantial number of people?
The analysis in this section is based on the Air Quality Report that was prepared for the proposed Project in October 2020 (Appendix A: Air Quality Report).
a. Would the project conflict with or obstruct implementation of the applicable air quality plan? Less than Significant Impact. The Project site is in the South Coast Air Basin (Basin), which is managed by the South Coast Air Quality Management District (SCAQMD). The California Air Resources Board (CARB) has designated the Basin as nonattainment for ozone, respirable particulate matter less than 10 micrometers in size (PM10), and fine inhalable particulate matter less than 2.5 micrometers in size (PM2.5) under the California Ambient Air Quality Standards. Under the National Ambient Air Quality Standards, the United States Environmental Protection Agency (EPA) has designated the status of the Basin as extreme nonattainment for ozone and moderate nonattainment for PM2.5.
The SCAQMD and Southern California Association of Governments (SCAG) are responsible for developing and implementing the Air Quality Management Plan (AQMP) for the Basin. The applicable AQMP is the SCAQMD Final 2016 AQMP.
9 The 2016 AQMP incorporates local General Plan land use assumptions and regional growth projections developed by SCAG to estimate stationary and mobile source emissions associated with projected population and planned land uses. If a new land use is consistent with the local General Plan and the regional growth projections adopted in the 2016 AQMP, then the added emissions are considered to have been evaluated, are contained in the 2016 AQMP, and would not conflict with or obstruct implementation of the regional 2016 AQMP.
The proposed Project is not considered a project of statewide, regional, or area-wide significance (e.g., large-scale projects such as airports, electrical generating facilities, petroleum and gas refineries,
9 Final 2016 Air Quality Management Plan. South Coast Air Quality Management District, March 2016.
7.c
Packet Pg. 417 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 24 residential development of more than 500 dwelling units, shopping center or business establishment employing more than 1,000 persons or encompassing more than 500,000 square feet of floor space, etc.) as defined in the California Code of Regulations [Title 14, Division 6, Chapter 3, Article 13, §15206(b)].
The proposed Project is listed in the 2016 financially constrained Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) Amendment No. 2, which was found to conform by SCAG on July 6, 2017, and by the Federal Transit Administration (FTA)/Federal Highway Administration (FHWA) on August 1, 2017. On September 6, 2018, SCAG’s Regional Council adopted the 206 RTP/SCS Amendment No. 3 but conformity determination approval from the FHWA is pending. The proposed Project is listed in the 2017 Federal Transportation Improvement Program (FTIP) 17-00 under ID No.
SDBSL08. The 2017 FTIP Consistency Amendment 17-18 was approved by SCAG on February 23, 2018, and by FTA/FHWA on March 26, 2018. The design concept and scope on the proposed Project is consistent with the Project description in the 2016 RTP and 2017 FTIP and the “open to traffic” assumptions of the SCAG’s regional emissions analysis.
No changes are proposed to either the Colton or Grand Terrace General Plan Land Use Designations and zoning designations as the proposed Project would occur within the Barton Road right-of-way. A small portion of parcel APN 0275-223-16 will be acquired by the proposed Project; however, the remainder of the parcel will not be redesignated to a new land use nor will it be rezoned. Overall, the proposed Project is not growth inducing, rather it is being implemented to improve safety along Barton Road. The proposed Project was already assumed in SCAG’s regional emissions analysis as such, the proposed Project is consistent with the 2016 AQMP. Impacts would be less than significant and no mitigation is required. b. Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard?
Less than Significant with Mitigation Incorporated. Emission Factors (EMFAC) is California’s federally approved on-road mobile source emission inventory model that reflects California-specific driving and environmental conditions, fleet mix, and mobile source regulations. EMFAC is a computer model used for estimating emission rates for on-road mobile sources in California for calendar years 2000 to 2050. The EMFAC Model was used to determine emissions of the proposed Project.
No single project is sufficient in size, by itself, to result in nonattainment of ambient air quality standards.
Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. The SCAQMD developed the thresholds of significance based on the level above which a project’s individual emissions would result in a cumulatively considerable contribution to the Basin’s existing air quality conditions. Therefore, a project that exceeds the SCAQMD project-specific thresholds would also have a cumulatively considerable contribution to a significant cumulative impact.
Construction Emissions. During construction, short-term degradation of air quality may occur due to the release of particulate emissions generated by excavation, grading, hauling, and other activities related to construction. Emissions from construction equipment also are anticipated and would include carbon monoxide (CO), nitrogen oxide (NOx), volatile organic compounds (VOC), directly emitted PM (PM2.5 and PM10), and Toxic Air Contaminants (e.g., diesel exhaust PM).
Site preparation and roadway construction would involve clearing, cut-and-fill activities, grading, and paving roadway surfaces. Construction-related effects on air quality from most roadway projects would be greatest during the site preparation phase because most engine emissions are associated with the
7.c
Packet Pg. 418 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 25 excavation, handling, and transport of soils to and from the site. If not properly controlled, these activities would temporarily generate CO, NOx, VOCs, PM10, and PM2.5. Sources of fugitive dust would include disturbed soils at the construction site and trucks carrying uncovered loads of soils. Unless properly controlled, vehicles leaving the site would deposit mud on local streets, which could be an additional source of airborne dust after drying. PM10 emissions would vary from day to day, depending on the nature and magnitude of construction activity and local weather conditions. PM10 emissions would also depend on soil moisture, the silt content of soil, wind speed, and the amount of equipment operating at the time.
Larger dust particles would settle near the source, while finer particles would be dispersed over greater distances from the construction site.
In addition to dust-related PM10 emissions, heavy trucks and construction equipment powered by gasoline and diesel engines would generate CO, NOx, VOCs, and some soot particulate (PM2.5 and PM10) in exhaust emissions. If construction activities were to increase traffic congestion in the area, CO and other emissions from traffic would increase while those vehicles are delayed. These emissions would be temporary and limited to the immediate area surrounding the construction site. Areas within 500 feet of CARB-defined sensitive land uses would be labeled as no-idle areas where material storage/transfer and equipment maintenance activities are not to occur. Existing land uses in the proposed Project area identified as sensitive receptors include single-family residential and multifamily residential units and a mobile home park.
SO2 is generated by oxidation during combustion of organic sulfur compounds contained in diesel fuel.
Off-road diesel fuel meeting federal standards can contain up to 5,000 parts per million of sulfur, whereas on-road diesel is restricted to less than 15 parts per million of sulfur. However, under California law and CARB regulations, off-road diesel fuel used in California must meet the same sulfur and other standards as on-road diesel fuel, so SO2-related issues due to diesel exhaust would be minimal.
The construction emissions were estimated for the proposed Project using the Sacramento Metropolitan Air Quality Management District’s Road Construction Emissions Model, Version 9.0.0, which is consistent with the guidance provided by the SCAQMD for evaluating construction impacts from roadway projects.
Table 3.3.A: Maximum Daily Project Construction Emissions presents the maximum amount of construction-related emissions during a peak construction day for the proposed Project. The PM10 and PM2.5 emissions assume a 50 percent control of fugitive dust as a result of watering and associated dust control measures. The Project construction emissions presented below are based on the best information available at the time of calculations and specify that the schedule for construction of the Project is anticipated to take approximately 14 months.
Table 3.3.A: Maximum Daily Project Construction Emissions Construction Phase ROG CO NOx Total PM10 Total PM2.5
Grubbing/Land Clearing (lbs/day) 1.11 9.87 11.99 16.52 3.79 Grading/Excavation (lbs/day) 9.30 69.99 105.01 20.31 7.22 Drainage/Utilities/Sub-Grade (lbs/day) 6.38 50.78 69.79 18.91 6.00 Paving (lbs/day) 1.02 13.22 12.02 0.60 0.50
Maximum (lbs/day) 9.30 69.99 105.01 20.31 7.22
Total (tons/construction project) 0.98 7.65 10.96 2.55 0.85 Source: LSA Associates, Air Quality Report Barton Bridge Removal and Road Construction Project Table 4-1: Maximum Daily Project Construction Emissions, page 40.
Notes: CO = Carbon monoxide; lbs/day = pounds per day; NOx = oxides of nitrogen; PM2.5 = particulate matter less than 2.5 microns in size; PM10 = particulate matter less than 10 microns in size; ROG= reactive organic gases.
7.c
Packet Pg. 419 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 26 Construction activities would not last for more than three years at one general location, so constructionrelated emissions do not need to be included in regional and project-level conformity analysis.
Implementation of Mitigation Measure AQ-1 would reduce maximum daily project construction emissions.
Mitigation Measure AQ-1: Prior to the commencement of any construction activities, the construction contractor shall submit a Construction Emission Control Plan for review and approval to the City of Colton Department of Public Works, which shall be implemented during construction. The Construction Emissions Control Plan shall comply with federal, State, and local regulations as specified in the measures below:
• The contractor shall adhere to the Caltrans Standard Specifications for Construction, Sections
14.9-01, 14.9-02, 14.9-03, 18-1.02C, and 18-1.03 (or Greenbook equivalent specifications).
Section 14-9-02 specifically requires compliance by the contractor with all applicable laws and regulations related to air quality, including air pollution control district and air quality management district regulations and local ordinances.
• Water or a dust palliative shall be applied to the site and equipment as often as necessary to control fugitive dust emissions. Fugitive emissions generally must meet a “no visible dust” criterion either at the point of emissions or at the right-of-way line depending on local regulations in compliance with the SCAQMD Rule 403 (Fugitive Dust). • Soil binder shall be spread on any unpaved roads used for construction purposes, and on all project construction parking areas (providing an estimated 50 percent reduction of fugitive emissions) in compliance with the SCAQMD Rule 403 (Fugitive Dust). • Trucks shall be washed as they leave the right-of-way as necessary to control fugitive dust emissions in compliance with the SCAQMD Rule 403 (Fugitive Dust). • Construction equipment and vehicles shall be properly tuned and maintained. All construction equipment shall use low-sulfur fuel as required by California Code of Regulations (CCR) Title 17, Section 93114.
• A dust control plan shall be developed documenting sprinkling, temporary paving, speed limits, and timely revegetation of disturbed slopes as needed to minimize construction impacts to existing communities in compliance with the SCAQMD Rule 403 (Fugitive Dust). • Equipment and material storage sites shall be located as far away from residential uses as practicable. Construction areas shall be kept clean and orderly in compliance with the SCAQMD Rule 402 (Nuisance).
• Within 500 feet of sensitive air receptors, construction activities involving the extended idling of diesel equipment or vehicles will be prohibited to the extent feasible [as required by CCR Title 13, Section 2485(c)].
• Track-out reduction measures shall be used, such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic, in accordance with the State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4). • All transported loads of soils and wet materials shall be covered before transport, or adequate freeboard (space from the top of the material to the top of the truck) shall be provided to minimize emission of dust during transportation in compliance with the SCAQMD Rule 403.
7.c
Packet Pg. 420 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 27 • Dust and mud that are deposited on paved, public roads due to construction activity and traffic shall be promptly and regularly removed to reduce PM emissions [State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4)]. • To the extent feasible, construction traffic shall be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times (consistent with the traffic control plan approved by the City of Colton Traffic Engineer). • Mulch, hydroseeding or effective equivalent will be installed or vegetation planted as soon as practical after grading to reduce windblown PM. Note that certain methods of mulch/hydroseeding placement may cause dust and visible emission issues and may require controls themselves [Calltrans Standard Specifications for Construction, Sections 18.1-02C (Dust Control Binders) and 18-1.03 (Construction – Dust Palliatives)or Greenbook equivalent].
With implementation of Mitigation Measure AQ-1 impacts pertaining to construction air quality emissions would be reduced to a less than significant impact.
Operational Emissions. The purpose of the Project is to provide safe connectivity between La Cadena and the Barton Road/I-215 interchange and to facilitate efficient access between Colton and Grand Terrace.
The potential impact of the proposed Project on regional vehicle emissions was calculated using traffic date for the Project region and emission rates from the Emission Factor Model, Version 2017 (EMFAC 2017). Table 3.3.B: Opening Year (2023) and Horizon Year (2045) Regional Vehicle Emissionssummarizes the Project emissions compared to the existing conditions (2019) and no build alternative conditions.
Table 3.3.B: Opening Year (2023) and Horizon Year (2045) Regional Vehicle Emissions Alternative
Vehicle Exhaust Fugitive Dust
ROG CO NOx PM10 PM2.5 PM10 PM2.5
Opening Year (2023) (lbs/day)
Existing (2019) 0.54 13.78 3.87 0.06 0.58 0.05 0.23
No Build Alternative (2023) 0.64 16.86 4.23 0.05 1.00 0.05 0.40 Change from Existing 0.10 3.09 0.36 0.00 0.41 0.00 0.16 Build Alternative (2023) 0.47 14.33 3.64 0.04 1.00 0.04 0.40 Change from Existing -0.07 0.55 -0.22 -0.02 0.41 -0.01 0.16 Change from No Build Alternative -0.17 -2.53 -0.58 -0.01 0.00 -0.01 0.00 Horizon Year (2045) (lbs/day)
Existing (2019) 0.54 13.78 3.87 0.06 0.58 0.05 0.23
No Build Alternative (2023) 0.56 12.28 2.38 0.03 1.43 0.03 0.57 Change from Existing 0.02 -1.50 -1.49 -0.03 0.85 -0.02 0.34 Build Alternative (2023) 0.50 11.67 2.04 0.03 1.43 0.03 0.57 Change from Existing -0.04 -2.11 -1.83 -0.03 0.85 -0.03 0.34 Change from No Build Alternative -0.06 -0.61 -0.34 0.00 0.00 0.00 0.00 Source: LSA Associates, Air Quality Report Barton Bridge Removal and Road Construction Project Table 4-2: 2023 Opening Year and 2045 Horizon Year Regional Vehicle Emissions, page 43.
Note: Totals may not appear to total correctly due to rounding. Fugitive dust consists of tire and brake wear and re-entrained road dust.
CO = Carbon monoxide; EMFAC = Emission Factor Model; lbs/day = pounds per day; NOx nitrogen oxides; PM2.5 = particulate matter less than 2.5 microns in size; PM10 = particulate matter less than 10 microns in size; ROG = reactive organic gases.
Table 3.3.B shows the vehicle exhaust emissions in 2023, the No Build Alternative and the proposed Project emissions are all lower than the existing condition emissions, except for fugitive dust PM10 and
7.c
Packet Pg. 421 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 28 PM2.5 emissions. Additionally, the proposed Project for horizon year 2045 criteria pollutant emissions from vehicle exhaust are all less than the No Build Alternative emissions under the horizon year. The fugitive PM2.5 and PM10 emissions consist of tire wear, brake dust, and re-entrained road dust emissions that are purely related to the increased regional vehicle miles traveled and not solely generated by the proposed Project. The slight increase in fugitive PM10 and PM2.5 emissions will not cause violations of the State PM10 and PM2.5 ambient air quality standards in the South Coast Air Basin. As such, the proposed Project would not substantially contribute or cause deterioration of existing air quality in the area. Impacts will be less than significant and no mitigation measures are required. c. Expose sensitive receptors to substantial pollutant concentrations? Less than Significant Impact. The Air Quality Report included a decision tree to determine if CO local analysis was required for the proposed Project in accordance to the Caltrans Transportation Project-Level Carbon Monoxide Protocol. The following provides a step-by-step explanation of the decision tree where each level cited is followed by a response as to why CO local analysis is required or not required.
1. Is the Project exempt from all emissions analyses? No. The proposed Project is not one of the exempt projects listed in the Caltrans Transportation Project-Level Carbon Monoxide Protocol; therefore, the proposed Project is not exempt from all emissions analyses.
2. Is the Project exempt from regional emissions analyses? No. Because the proposed Project would expand and add traffic lanes to an existing bridge, it is not exempt from regional emission analysis.
3. Is the Project locally defined as regionally significant? No. The proposed Project would replace an existing two-lane bridge with a widened two-lane surface road. Therefore, the proposed Project is not regionally significant.
4. Are there a currently conforming Regional Transportation Plan (RTP) and Transportation Improvement Plan (TIP)? Yes.
5. Is the Project included in the regional emissions analysis supporting the currently conforming RTP and TIP? Yes. The proposed Project is included in the SCAG 2016 RTP and the 2019 FTIP.
6. Has the Project design concept and/or scope changed significantly from that in the regional analysis? No. Regional conformity for the proposed Project has been demonstrated for the RTP and the FTIP. The proposed Project is consistent with the Project description in the 2016 RTP/SCS and the 2019 FTIP.
7. Is the Project in a CO nonattainment area? No. The Project site is in an area that has demonstrated attainment with the federal CO standards.
8. Was the area redesignated as “attainment” after the 1990 Clean Air Act? Yes.
9. Has “continued attainment” been verified with the local Air District, if appropriate? Yes. The U.S.
EPA designated the Basin as attainment/maintenance on June 11, 2007.
10. Does the Project worsen air quality? No. Because the proposed Project would not meet any criteria discussed below, it would not potentially worsen air quality. a. The project significantly increases the percentage of vehicles operating in cold start mode.
Increasing the number of vehicles operating in cold start mode by as little as 2 percent should be considered potentially significant. The percentage of vehicles operating in cold start mode is the same or lower for the bridge under study compared to those used for the intersections in the attainment plan. It is assumed that all vehicles on the Barton Road are in a fully warmed-up mode.
Therefore, this criterion is not met.
7.c
Packet Pg. 422 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 29 b. The Project significantly increases traffic volumes. Increases in traffic volumes in excess of 5 percent should be considered potentially significant. Increase the traffic volume by less than 5 percent may still be potentially significant if there is also a reduction in average speeds. The proposed Project will improve safety and operation for vehicles traveling on Barton Road between La Cadena and the I-215 interchange. Although the Project would result in lower traffic delays and traffic congestion, the proposed Project would not increase traffic volumes on Barton Road between La Cadena and the I-215 interchange. Therefore, this criterion is not met. c. The Project worsens traffic flow. For uninterrupted roadway segments, a reduction in average speeds (within a range of 3 to 50 miles per hour [mph]) should be regarded as worsening traffic flow. For intersection segments, a reduction in average speed or an increase in average delay should be considered as worsening traffic flow. The proposed Project would represent the lowest volume-to-capacity ratio for the Project’s roadway segment of Barton Road between La Cadena and the I-215 interchange under Opening Day (2023) and Horizon Year (2045) conditions. Because the Project would not worsen traffic flow, rather expanding existing lanes to provide improvements to traffic flow and safety, this criterion is not met.
Based on the CO protocol steps discussed above, the proposed Project would be considered satisfactory, and no further CO analysis is needed.
The U.S. EPA modified the nitrogen dioxide (NO2) NAAQS to include a 1-hour standard of 100 part per billion in 2010. Currently, there is no federal project-level NO2 analysis requirement. However, NO2 is among the near-road pollutants of concern. Within the Project area, it is unlikely NO2 standards for sensitive receptors will be approached or exceeded based on the relatively low ambient concentrations of NO2 in the South Coast Air Basin and on the long-term trend toward reduction of NOx emissions. Based on this, a specific analysis of NO2 was not warranted for the proposed Project.
The existing traffic on Barton Road is well below the criteria of 125,000 average daily trips or 10,000 truck trips pertaining to the requirement for Mobile Source Air Toxics Analysis. The proposed Project is not expected to result in a substantial change to automobile or truck volumes on Barton Road or adjacent streets. Consequently, the emission effects of the proposed Project would be low, and it is expected that there would be no appreciable difference in overall Mobile Source Air Toxics Analysis emissions between the No Build Alternative and the proposed Project. Because the emission effects of the proposed Project would be low, it is expected that there would be no appreciable difference in overall Mobile Source Air Toxics Analysis emissions between no development occurring and the proposed Project occurring.
Overall, the proposed Project would not expose sensitive receptors to substantial pollutant concentrations compared to existing emissions and emissions under a No Build Alternative. Impacts would be less than significant and no mitigation measures would be required. d. Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant Impact. Other emissions, including objectionable odors, may occur during the operation of diesel-fueled equipment during construction of the proposed Project. However, these emissions would be short in duration and are expected to be isolated to the immediate vicinity of the construction site or transport route. SCAQMD Rules 402, 403, and 431.2, as well as Title 13, Section 2449(d)(d) of the CCR, require the Project applicant to include implementation of standard control measures for fugitive dust and diesel equipment emissions. Additionally, operators of off-road vehicles
7.c
Packet Pg. 423 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 30 (i.e., self-propelled diesel-fueled vehicles 25 horsepower and up that were not designed to be driven on road) are required to limit vehicle idling to five minutes or less; register and label vehicles in accordance with CARB Diesel Off-Road Online Reporting System; restrict the inclusion of older vehicles into fleets; and retire, replace, or repower older engines or install Verified Diesel Emission Control Strategies (i.e., exhaust retrofits). The SCAQMD Rule 402 regarding nuisances states: “A person shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a natural tendency to cause injury or damage to business or property.” Adherence to these rules is standard regulatory policy for all construction projects in California and would reduce impact levels from other emissions such as objectionable odors to less than significant. No mitigation is required.
7.c
Packet Pg. 424 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 31 3.4 BIOLOGICAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Have a substantial adverse effect, either
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special-status species in local or
regional plans, policies, or regulations, or by
the California Department of Fish and
Wildlife or U.S. Fish and Wildlife Service?
b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, and regulations or by the
California Department of Fish and Wildlife
or U.S. Fish and Wildlife Service?
c. Have a substantial adverse effect on State
or federally protected wetlands (including,
but not limited to, marsh, vernal pool,
coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
d. Interfere substantially with the movement
of any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
e. Conflict with any local policies or ordinances
protecting biological resources, such as a
tree preservation policy or ordinance?
f. Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural
Community Conservation Plan, or other
approved local, regional, or State habitat
conservation plan?
The analysis in this section is based on the Barton Road Bridge Removal and Road Construction Project Natural Environment Study Minimal Impacts (NESMI) that was prepared and approved for the proposed Project in July 2020 (Appendix B: Natural Environment Study Minimal Impacts [NESMI]).
7.c
Packet Pg. 425 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 32 a. Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less than Significant with Mitigation Incorporated. The proposed Project site is currently occupied by Barton Road and the Barton Road Bridge over the abandoned UPRR corridor. A Biological Study Area (BSA) was created to encompass the proposed Project footprint and typical habitats in the immediate project vicinity that may be directly or indirectly affected by the proposed Project. The BSA includes the Barton Road right-of-way between the east side of the South Terrace Avenue intersection in the City of Colton and extends to approximately 75 feet west of the intersection of Grand Terrace Avenue in the City of Grand Terrace. Vegetative communities within the BSA consist of nonnative grasslands and ornamental trees and shrubs. No natural communities are present in the BSA.
According to the California Natural Diversity Data Base maintained by the California Department of Fish and Wildlife (CDFW)10 and the California Native Plant Society Inventory of Rare and Endangered Plants,11 there are several records of species of plants and animals or sensitive plant associations that are found within the San Bernardino South, California USGS 7.5‐minute quadrangle. Review of these databases indicate that 54 special-status species as being potentially present within the vicinity of the BSA. Of the 54 special-status plant and animal species potentially present in the BSA, 19 are federally/State listed as threatened or endangered, and one is a candidate for State listed as Endangered. No suitable habitat is present for any of the 19 federally/State listed species or single candidate species due to the disturbed/developed site conditions. In addition, no designated critical habitats occur within the BSA.
Thirty-four of the 54 species listed are non-listed special-status species with potential to occur in the Project area. Habitat is not present for 33 of the non-listed special status species in the BSA due to the disturbed/developed conditions; however, habitat is presented for one species, the western yellow bat.
The western yellow bat may utilize the palm trees in the BSA for roosting and may use habitat in the BSA for foraging activities. Implementation of the proposed Project may require removal of ornamental trees, as part of roadway construction. As such, the proposed Project has the potential to affect the yellow bat as well as other non-special status bat species that may use ornamental vegetation for roosting within the BSA. To reduce potential impacts to the yellow bat and other bat species, the following mitigation measures would be implemented.
Mitigation Measure BIO-1: Prior to construction, an approved bat biologist shall be retained by the Project proponent to conduct a bat assessment survey to determine the presence or absence of bat species that may occur within the Project limits. Should the presence of bat species be determined during this assessment, the following measures shall be implemented:
• Nighttime exit counts and acoustic surveys shall be performed by a qualified bat biologist at all structures and palm trees that may be subject to project-related impacts. These surveys shall be performed during the recognized bat maternity season (April 1 through August 31, but preferably in June or July) and as far in advance of construction as possible in order to provide adequate time for mitigation planning.
10 California Natural Diversity Data Base, RareFind 5 and Biogeographic Information and Observation System online mapping tool. California Department of Fish and Wildlife. https://www.wildlife.ca.gov/Data/CNDDB/Maps-and-Data (accessed July 2020). 11 Inventory of Rare and Endangered Plants. California Native Plant Society. http://www.rareplants.cnps.org/ result.html?adv=t&cnps=1A:1B:2A:2B:3:4&fesa=FE:FT&quad=3411716 (accessed July 2020).
7.c
Packet Pg. 426 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 33 • Construction activities at structures housing maternity colonies shall be coordinated with an approved bat biologist and CDFW.
• If direct impacts to bat-roosting habitat are anticipated, humane evictions and exclusions of roosting bats shall be performed under the supervision of an approved bat biologist after August 31 in the fall (September or October) prior to any work activities that would result in direct impacts or direct mortality to roosting bats. This action shall be performed in coordination with the CDFW. To avoid potential mortality of flightless juvenile bats, evictions and exclusions of bats cannot be performed during the maternity season (April 1 through August 31). Winter months are also inappropriate for bat eviction because not all individuals in a roost will emerge on any given night. In addition, long-distance movements to other roost sites are more difficult during the winter when prey availability is scarce, resulting in high mortality rates of evicted bats. • Alternative bat-roosting habitat structures shall be installed on the structures prior to the eviction/exclusion of bats from that structure. The design, numbers, and locations of these roost structures shall be determined in consultation with an approved bat biologist. • If permanent, direct impacts to bat-roosting habitat are anticipated and a humane eviction/exclusion is performed, alternative permanent roosting habitat shall be provided to ensure no net loss of bat-roosting habitat. This action shall be coordinated with the CDFW, and locations of these roost structures shall be determined in consultation with an approved bat biologist to ensure that the installed habitat provides adequate mitigation for impacts. • The loss of a night roost can negatively affect the use of a foraging area, and consequently may result in reduced fecundity in species that are already slow to reproduce. If night roosting is confirmed at any of the structures within the proposed Project area, the following measure to minimize potential impacts to night-roosting and foraging bats shall be implemented:
o At structures where night roosting is suspected or confirmed, work shall be limited to the daylight hours to the greatest extent feasible to avoid potential disruption of foraging. If night work cannot be avoided, night lighting shall be focused only on the area of direct work, airspace access to and from the roost features of the structure shall not be obstructed, and light spillover into the adjacent foraging areas shall be minimized to the greatest extent feasible.
Through implementation of Mitigation Measure BIO-1, impacts to species identified as a candidate, sensitive, or special-status would be reduced to less than significant levels with mitigation incorporated.b.Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? No Impact. Certain habitats/natural communities are considered to be of special concern based on, 1) federal, State, or local laws regulating their development; 2) limited distributions; and/or 3) whether they support the habitat requirements of special-status plants or animals. Per the Natural Environment Study (Minimal Impacts), no riparian habitat, sensitive natural communities, or wetland habitat is located on the Project site. Therefore, no impact would occur to any riparian habitat or other sensitive natural community. No mitigation is required.
7.c
Packet Pg. 427 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 34 c. Have a substantial adverse effect on State or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact. The U.S. Army Corps of Engineers regulates discharges of dredge or fill material into water of the U.S. including wetlands and non-wetland bodies of water that meet specific criteria. To be considered a jurisdictional wetland under Section 404 of the Federal Clean Water Act (CWA), an area must possess three wetland characteristics: hydrophytic vegetation, hydric soils, and wetland hydrology. No potential jurisdictional features were found to be present within the Project limits.
Per the Natural Environment Study (Minimal Impacts), no drainages, vernal pools, or other riparian or wetland areas are located on site; therefore, the Project would not affect potentially jurisdictional waters.
The Project is not subject to the regulatory authority of the U.S. Army Corps of Engineers under Section 404 of the CWA, the Regional Water Quality Control Board (RWQCB) under Section 401 of the CWA, or the CDFW under Sections 1600 et seq. of the California Fish and Game Code. Therefore, the proposed Project would have no effects on State or federally protected wetlands. No impact would occur and no mitigation is required.
d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Less than Significant with Mitigation Incorporated. Habitat fragmentation occurs when a single, contiguous habitat area is divided into two or more areas, or where an action isolates two or more new areas from each other. Isolation of habitat occurs when wildlife cannot move freely from one portion of the habitat to another or to/from one habitat type to another. Habitat fragmentation may occur when a portion of one or more habitats is converted into another habitat, as when scrub habitats are converted into annual grassland habitat because of frequent burning. Wildlife movement includes seasonal migration along corridors, as well as daily movements for foraging. Examples of migration corridors include areas of unobstructed movement for deer, riparian corridors providing cover for migrating birds, routes between breeding waters and upland habitat for amphibians, and between roosting and feeding areas for birds.
The Project site is located on Barton Road in an urbanized area straddling the city boundary of Colton and Grand Terrace. The Project site does not function as a wildlife corridor; however, colonies of bats could use the palm trees within the Project boundary for roosting and nursery sites. Impacts to bats would be reduced through implementation of Mitigation Measure BIO-1 as identified above in Section 3.4(a).
Existing ornamental vegetation within the Project boundary could also support nesting raptors, specialstatus birds, and other migratory bird species between February 15 through August 31 (bird breeding season); therefore, the proposed Project (specifically during construction) may result in direct or indirect impacts to nesting birds. Although the Project does have potential to affect migratory/nesting birds, implementation of Mitigation Measure BIO-2 would protect migratory birds during the nesting bird season when unfledged offspring would not be able to safely flee the site during construction through the provision of appropriate buffers within which construction would not be allowed.
Mitigation Measure BIO-2: If feasible, project construction and any vegetation removal should begin outside of bird breeding season (typically between September 1 and February 14). In the event that project construction cannot be conducted outside the bird breeding season, and vegetation will be removed, focused surveys shall be conducted by a qualified biologist prior to ground-disturbing
7.c
Packet Pg. 428 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 35 activities. Should nesting birds be found, an exclusionary buffer shall be established by a qualified biologist. The buffer may be up to 500 feet in diameter depending on the species of nesting bird found.
This buffer shall be clearly marked in the field by construction personnel under guidance of the qualified biologist, and construction or clearing shall not be conducted within this zone until the qualified biologist determines that the young have fledged or the nest is no longer active. Nesting bird habitat within the BSA shall be resurveyed during bird breeding season if there is a lapse in construction activities longer than seven days.
Implementation of Mitigation Measures BIO-1 and BIO-2 would reduce the Project’s interference with the movement of any native resident or migratory species and would reduce impacts to native wildlife nursery sites. Impacts would therefore be less than significant with mitigation incorporated. e. Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Less than Significant Impact. City of Grand Terrace Municipal Code Section 12.18.100, “Removal,” prohibits tree removal or injury within City streets and parkways without a permit. City of Colton Municipal Code Sections 12.20.040 and 12.20.041 requires permits for planting, trimming, removal, chemical treatment or otherwise disturb any City tree and provides a list of tree protection guidelines, respectively. The proposed Project would require the removal of trees to increase the right-of-way for Barton Road and implementation of sidewalks and a Class II bicycle lane in each direction of the road. The Project proponent, as a condition of approval, would be required to obtain tree permits from each City in order to ensure compliance with each cities Municipal Code Sections. As no conflict with any local policies or ordinances protecting biological resources would occur, no mitigation is required. The Project would not conflict with any ordinances protecting biological resources, such as trees, and impacts would be less than significant.
f. Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan? No Impact. The Project site is not within any adopted habitat conservation plans, natural community conservation plans, or any other regional planning areas identified by the U.S. Fish and Wildlife Service, CDFW, or the cities of Colton and Grand Terrace.
12,13 Therefore, implementation of the proposed Project would not conflict with the provisions of any adopted local or regional conservation plans. No impact to adopted habitat conservation plans would occur and no mitigation is required.
12 California Natural Diversity Data Base, RareFind 5 and Biogeographic Information and Observation System online mapping tool. California Department of Fish and Wildlife. https://www.wildlife.ca.gov/Data/CNDDB/Maps-and-Data (accessed October 8, 2020). 13 Information for Planning and Consultation, Facilities. United States Fish and Wildlife Service. https://ecos.fws.gov/ipac/ location/VKT4QFYV5FHP5FCSEJAK4YRDEM/resources#facilities (accessed October 8, 2020).
7.c
Packet Pg. 429 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 36 3.5 CULTURAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Cause a substantial adverse change in the
significance of a historical resource
pursuant to §15064.5?
b. Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to §15064.5?
c. Disturb any human remains, including those
interred outside of dedicated cemeteries?
The analysis in this section is based on the Historic Property Survey Report (HPSR) and Archaeological Survey Report (ASR) for the Barton Road Bridge Removal and Road Construction that were both prepared for the proposed Project in August 2020 (Appendix C: Historic Survey Report [HPSR] and Archaeological Survey Report [ASR]).
a. Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5?
b. Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
Less than Significant with Mitigation Incorporated. Pursuant to CEQA Guidelines §15064.5, the term “historical resource” shall include:
(1) A resource listed in, or determined to be eligible by the State Historical Resources Commission for listing in, the California Register of Historical Resources (Pub. Res. Code §5024.1, Title 14 CCR, Section 4850 et seq.).
(2) A resource included in a local register of historical resources, as defined in Section 5020.1(k) of the Public Resources Code or identified as significant in an historical resource survey meeting the requirements Section 5024.1(g) of the Public Resources Code, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant. (3) Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be an historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the California Register of Historical Resources (Pub. Res. Code, § 5024.1, Title 14 CCR, Section 4852) including the following:
A. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.
7.c
Packet Pg. 430 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 37 B. Is associated with the lives of persons important in our past.
C. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.
D. Has yielded, or may be likely to yield, information important in prehistory or history.
A “substantial adverse change” to a historical resource, according to Public Resources Code (PRC) §5020.1(q), “means demolition, destruction, relocation, or alteration such that the significance of a historical resource would be impaired.”
The Historic Property Survey Report prepared for the proposed Project indicated that there have been 17 cultural resource studies previously conducted within one mile of the Project site, two of which included parts of the Project site. A linear cultural resource transects the Project site (36-006101, the historic period UPRR route) and 25 additional cultural resources have been documented within one mile of the Project site. The additional cultural resources include prehistoric (habitation site, rock shelters, milling features, and artifactscatters) and historic period (rock shelter) archaeological resources, along with historic period utilities, railroads, water conveyance systems, a residence, school, and bridge. The segment of UPRR route transecting the Project site was evaluated in 2009 as not eligible for the National Register either individually or as contributing segments to the overall alignment. The Barton Road Bridge is listed in the California Historical Significance Local Agency Bridge List as a Category 5 Bridge; however, it is not eligible for the National Register. With the exception of the Barton Road Bridge, none of the resources identified is listed in any of the registers, directories, or inventories. The nearest prehistoric resource (a habitation site and artifact scatter) was documented approximately 0.57 mile north of the proposed Project site.
Additional previous research indicated that two additional built environment resources (21842 Grand Terrace Road and 21892 Grand Terrace Road); however, these two historic period residences were evaluated as not eligible for the National Register and concurred with by the State Historic Preservation Office in 2011.
Due to the minimal results of the records search and the survey conducted for the proposed Project, along with the average depth of road subgrades (3+ feet) and severe disturbance of urban road right-of-way, there is a small potential for intact subsurface cultural deposits being found during Project construction activities. If previously unidentified cultural materials are unearthed during project construction, the following mitigation measure shall be implemented to reduce potential impacts to historic and archaeological resources:
Mitigation Measure CUL-1: If deposits of prehistoric or historical archaeological materials are discovered during non-monitored Project activities, all work within 25 feet of the discovery shall be redirected and a qualified archaeologist contacted, if one is not present, to assess the situation, consult with agencies as appropriate, and make recommendations for the treatment of the discovery. The City of Colton and Grand Terrace shall also be notified. Project personnel shall not collect or move any archaeological materials uncovered by construction activities.
Any adverse impacts to the finds shall be avoided by Project construction activities. If avoidance is not feasible, the archaeological deposits shall be evaluated to determine if they qualify as a historical resource or unique archaeological resource, or as historic property. If the deposits do not so qualify, avoidance is not necessary. If the deposits do so qualify, adverse impacts on the deposits shall be avoided, or such impacts shall be mitigated. Mitigation may consist of, but is not limited to, recovery and analysis of the archaeological deposit; recording the resource; preparing a report of findings; and
7.c
Packet Pg. 431 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 38 accessioning recovered archaeological materials at an appropriate curation facility. Educational public outreach may also be appropriate. Upon completion of the assessment, the archaeologist shall prepare a report documenting the methods and results, and provide recommendations for the treatment of the archaeological deposits discovered. The report shall be submitted to the City of Colton and City of Grand Terrace.
With implementation of Mitigation Measure CUL-1, impacts to “historical resources” as defined under CEQA Guidelines §15064.5 or “archaeological resources” pursuant to CEQA Guidelines §15064.5 would be reduced to less than significant levels with mitigation incorporated. c. Disturb any human remains, including those interred outside of dedicated cemeteries? Less than Significant Impact. No known human remains are present on the Project site and there is no evidence that Native Americans are buried on the Project site. In the unlikely event that human remains are encountered during Project construction, the proper authorities (i.e., San Bernardino County Coroner) shall be notified, and standard procedures for the respectful handling of human remains during the earthmoving activities will be followed. Construction contractors are required to adhere to CCR Section 15064.5(e), PRC Section 5097, and Section 7050.5 of the State’s Health and Safety Code. In the event of an unanticipated discovery of a human burial, human bone or suspected human bone, or funerary objects associated with a human burial, the law requires all excavation or grading in the vicinity of the find halt immediately, the area of the find be protected, and the contractor immediately notify the County Coroner of the find. The construction contractor, project proponent, and the County Coroner are required to comply with the provisions of CCR Section 15064.5(e), PRC Section 5097.98, and Section 7050.5 of the State’s Health and Safety Code. Compliance with these provisions would ensure that any potential impacts to unknown buried human remains would be less than significant by ensuring appropriate examination, treatment, and protection of human remains as required by State law. No specific mitigation is required.
7.c
Packet Pg. 432 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 39 3.6 ENERGY
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Result in potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption of
energy resources, during project
construction or operation?
b. Conflict with or obstruct a state or local plan
for renewable energy or energy efficiency?
a. Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than Significant Impact. The Project’s consumption of energy during construction is calculated via the California Emission Estimator Model (CalEEMod), as detailed in Appendix A: Air Quality Report.
Energy consumption during operation of the proposed Project has not been considered as the proposed Project includes removal of an existing bridge, replacement with fill and new roadbed to reconnect Barton Road, installation of Class II bicycle lanes, and sidewalks for improved safety and pedestrian/bicyclists connection.
The project’s consumption of energy during construction has been calculated via CalEEMod. The CalEEMod output for energy consumption incorporates project compliance with SCAQMD Rule 431.2, Title 13-Section 2449 of the California Code of Regulations. Adherence to this regulation, including the implementation of Best Available Control Measures (BACM), is a standard requirement for any construction or ground disturbance activity occurring within the South Coast Air Basin. BACMs include, but are not limited to, requirements that the Project proponent utilize only low-sulfur fuel (i.e., having a sulfur content of 15 parts per million by weight or less); ensure off-road vehicles (i.e., self-propelled dieselfueled vehicles 25 horsepower and higher that were not designed to be driven on road) limit vehicle idling to five minutes or less; register and label vehicles in accordance with the CARB Diesel Off-Road Online Reporting System; restrict the inclusion of older vehicles into fleets; and retire, replace, or repower older engines or install Verified Diesel Emission Control Strategies (i.e., exhaust retrofits). Additionally, the construction contractor will recycle/reuse at least 50 percent of the construction material (including, but not limited to, proposed aggregate base, soil, mulch, vegetation, concrete, lumber, metal, and cardboard) and use “Green Building Materials,” such as those materials that are rapidly renewable or resource efficient, and recycled and manufactured in an environmentally friendly way, for at least 10 percent of the Project, in accordance with California Department of Resources Recycling and Recovery (CalRecycle) regulations.
Construction Energy Usage. Approximately 5,500 cubic yards of soil will be removed as part of the proposed Project, and 4,300 cubic yards of fill will be imported to the Project site in order to bring the bridge area to grade with Barton Road. The CalEEMod output assumes 330 daily vehicle miles traveled (VMT) for asphalt hauling emissions and 2,360 daily VMT for worker commute emissions. One crawler
7.c
Packet Pg. 433 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 40 tractor, two excavators and one signal board are anticipated to be used during grubbing/land clearing activities; one crane, two crawler tractors, four excavators, two graders, three rollers, three rubber tired loaders, four scrapers, one signal board, and two tractors/loaders/backhoes are anticipated to be used during grading/excavation activities; during drainage/utilities/subgrade activities one air compressor, one generator set, two graders, one plate compactor, one pump, one forklift, four scrapers, one signal board, and two trenchers will be used. During paving activities, one paver, one paving equipment, one roller, one signal board, and two tractors/loaders/backhoes will be used during this stage of construction.
Based on these construction assumptions, construction activities would consume a total of approximately 8,825.60 gallons of gasoline and 1,488,601 gallons of diesel fuel consumption over the 14-month construction period for the proposed Project. Construction of the proposed Project would not result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources. Impacts would be less than significant and no mitigation is required. b. Conflict with or obstruct a State or local plan for renewable energy or energy efficiency? Less than Significant Impact. The Project would be required to comply with codes pertaining to energy conservation standards as stated in Response to Question 3.6a in effect at the time of construction.
Therefore, the proposed Project would be consistent with applicable plans related to renewable energy and energy efficiency. Impacts would be less than significant and no mitigation is required.
7.c
Packet Pg. 434 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 41 3.7 GEOLOGY AND SOILS
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Directly or indirectly cause potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
i. Rupture of a known earthquake
fault, as delineated on the most
recent Alquist-Priolo Earthquake
Fault Zoning Map issued by the State
Geologist for the area or based on
other substantial evidence of a
known fault? Refer to Division of
Mines and Geology Special
Publication 42.
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure,
including liquefaction?
iv. Landslides?
b. Result in substantial soil erosion or the loss
of topsoil?
c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as
a result of the project, and potentially result
in on-site or off-site landslide, lateral
spreading, subsidence, liquefaction, or
collapse?
d. Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code
(1994), creating substantial risks to life or
property?
e. Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems
where sewers are not available for the
disposal of wastewater?
f. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
7.c
Packet Pg. 435 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 42 a. Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
ii Strong seismic ground shaking?
iii Seismic-related ground failure, including liquefaction? iv Landslides?
i. No Impact. The Alquist-Priolo Earthquake Fault Zoning Act (Act) mitigates fault rupture hazards by prohibiting the development of structures for human occupancy across the trace of an active fault.
The Act requires the State Geologist to delineate “Earthquake Fault Zones” along faults that are “sufficiently active” and “well defined.” The boundary of an “Earthquake Fault Zone” is generally 500 feet from major active faults and between 200 and 300 feet from well-defined minor faults. Based on the information published by the Department of Conservation, State of California the Project site is not located within an Alquist-Priolo Special Study Zone. 14 The Rialto-Colton Fault line is approximately
1.6 miles northeast of the Project site.15 Therefore, no impact related to fault rupture would result from the implementation of the project. No mitigation is required. ii. Less than Significant Impact. Like all of southern California, the Project site has and will continue to be subject to ground shaking generated from activity on local and regional faults. Based on United States Seismic Design Maps, the proposed structures may be subject to and must accommodate up to a maximum site horizontal acceleration of 0.910g with two percent probability of being exceeded in 50 years.
16 No permanent occupation of the site would occur as the Project includes replacement of Barton Road Bridge with a filled new portion of Barton Road. In addition, the proposed Project is removing a seismically deficient bridge and replacing it with an at-grade roadway which is a beneficial impact to the traveling public. Impacts would be less than significant because the proposed Project would not construct large-scale, habitable structures or expose site visitors to any geologic or seismic hazards. No mitigation is required.
iii. No Impact. Liquefaction occurs when loose, unconsolidated, water-laden soils are subject to shaking, causing the soils to lose cohesion. Review of the California Department of Conservation Hazard Map indicates the Project site is not in an area susceptible to seismically induced liquefaction.17 Therefore, no impacts related to liquefaction risk are anticipated to occur and no mitigation is required. iv. No Impact. The Project site is characterized by flat topography. Review of the California Department of Conservation Hazard Map indicates the Project site is not in an area susceptible to seismically
14 California Department of Conservation, California Geological Survey, Website: https://maps.conservation.ca.gov/cgs/fam/.
Accessed October 9, 2020. 15 California Department of Conservation, California Geological Survey, Website: https://maps.conservation.ca.gov/cgs/fam/.
Accessed October 9, 2020. 16 California Department of Conservation, Ground Motion Interpolator, Website: https://www.conservation.ca.gov/cgs/ Pages/PSHA/ground-motion-interpolator.aspx. Accessed October 9, 2020. 17 California Department of Conservation, California Geological Survey, Website: https://maps.conservation.ca.gov/cgs/fam/.
Accessed October 9, 2020.
7.c
Packet Pg. 436 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 43 induced landslides.18 The City of Colton General Plan EIR, Exhibit 4.6-4, confirms that the Project site is not located on land susceptible to landslides. Therefore, the likelihood of a landslide on the Project site is low and no impacts associated with landslides would occur. No mitigation is required. b. Result in substantial soil erosion or the loss of topsoil? Less than Significant Impact. The proposed Project site is currently occupied by Barton Road and the Barton Road Bridge spanning the abandoned UPRR corridor. The proposed Project would include the removal of Barton Road Bridge, which will be replaced by fill, to develop a new roadbed that will connect to the existing Barton Road. Approximately 5,500 cubic yards of soil will be removed from the Project site, and replaced with approximately 4,300 cubic yards of fill to bring the bridge area to grade with Barton Road. The proposed Project would implement standard erosion control measures in accordance with Caltrans, the City of Colton Municipal Code Chapter 15.22 Floodplain Management Regulations, and the City of Grand Terrace Municipal Code Chapter 15.62 Floodplain Management, which would reduce substantial soil erosion. The proposed Project will also remove and reconstruct the drainage outlet west of Grand Terrace Avenue and construct a drainage culvert across Barton Road in the vicinity of the abandoned UPRR corridor. These design features will convey stormwater once the Project is complete and would assist in reducing soil erosion and loss of topsoil downstream and in off-site locations around the Project site. Compliance with City’s Municipal Code and National Pollutant Discharge Elimination System (NPDES) requirements would ensure that the proposed project would have a less than significant impact related to soil erosion or loss of topsoil. No mitigation is required. c. Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on-site or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Less than Significant Impact. Liquefaction occurs primarily in saturated, loose, fine-to-medium-grained alluvial soils in areas where the groundwater table is within 50 feet of the surface. Shaking suddenly causes soils to lose strength and behave as a liquid.
Lateral spreading is a type of liquefaction-induced ground failure associated with the lateral displacement of surficial blocks of sediment resulting from liquefaction in a subsurface layer. Once liquefaction transforms the subsurface layer into a fluid mass, gravity plus the seismic inertial forces may cause the mass to move downslope toward a free face (such as a river channel or an embankment). Lateral spreading may cause large horizontal displacements and such movement typically damages pipelines, utilities, bridges, and structures.
Factors that contribute to slope failure and landslides include slope height and steepness, shear strength and orientation of weak layers in the underlying geologic units, and pore water pressures.
Ground subsidence is typically a gradual settling or sinking of the ground surface with little or no horizontal movement, although fissures (cracks and separations) can result from lowering of the ground surface.
Most of the damage caused by subsidence is the result of oil, gas, or groundwater extraction from below the ground surface. Ground subsidence may occur as a response to natural forces such as earthquake
18 California Department of Conservation, California Geological Survey, Website: https://maps.conservation.ca.gov/cgs/fam/.
Accessed October 9, 2020.
7.c
Packet Pg. 437 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 44 movements, which can cause abrupt elevation changes of several feet or densification of low density granular soils during an earthquake event that may cause several inches of settlement.
Hydrocompaction, or soil collapse, typically occurs in recently deposited Holocene (less than 11,000 years before present time) soils that were deposited in an arid or semi-arid environment. Soils prone to collapse are commonly associated with man-made fill, wind-laid sands and silts, and alluvial fan and mudflow sediments deposited during flash floods. Sudden substantial settlement may occur when saturated, collapsible soils lose their cohesion. An increase in surface water infiltration (such as from irrigation) or a rise in the groundwater table, combined with the weight of a building or structure, may initiate settlement, causing foundations and walls to crack.
The proposed Project is located on near level topography and is not located in an area subject to liquefaction, landslides, subsidence, lateral spreading, or collapse. As such, the proposed Project has a low susceptibility to such geological hazards.
Where exposure to these hazards cannot be entirely avoided, the Project would implement established engineering and construction criteria designed to reduce the risk associated with unstable soils, landslides, lateral spreading, subsidence, liquefaction, soils collapse, and expansive soils. Compliance with existing regulations and requirements would reduce the risk of unstable geologic soils or units to less than significant levels. No mitigation is required.
d. Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property?
Less than Significant Impact. Expansive soils generally have a substantial amount of clay particles that can give up water (shrink) or absorb water (swell). The change in the volume exerts stress on structures and other loads placed on these soils. The extent or range of the shrink/swell is influenced by the amount and kind of clay present in the soil. The occurrence of these soils is often associated with geologic units having marginal stability. Expansive soils can be widely dispersed and they can occur in hillside areas as well as low-lying alluvial basins.
Soils on the Project site consist of Greenfield sandy loam, 2 to 9 percent slopes. The City of Colton General Plan EIR, Exhibit 4.6-4, shows that the Project site is not located on soils that are subject to expansive conditions. In addition soils that are used for in-fill onsite would be engineered to not be subject to shrink and swell. Based on the location of the Project on non-expansive soils, impacts would be less than significant and no mitigation is required.
e. Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact. The Project, consisting of road improvements/bridge removal, would not require the construction or expansion of septic tanks or wastewater treatment facilities. Therefore, alternative wastewater disposal systems would not be utilized. No impact would occur and no mitigation is required.
7.c
Packet Pg. 438 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 45 f. Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Less than Significant with Mitigation Incorporated. The Project site is underlain by weakly indurated alluvial fan deposits derived from local terrains of plutonic rocks (Qoa), which are Pleistocene in age.19 Pleistocene sediments mapped at the surface have high potential to contain significant nonrenewable paleontological resources, and therefore are considered high to paleontological sensitivity. Pleistocene alluvial sediments elsewhere throughout Riverside and San Bernardino counties and the Inland Empire have been reported to yield significant fossils of extinct animals from the Ice Age. Fossils recovered from these Pleistocene sediments represent extinct taxa including mammoths, mastodons, ground sloths, dire wolves, saber-toothed cats, large and small horses, large and small camels, and bison, as well as plant macro- and microfossils.
The majority of the Project site has already been disturbed due to development of Barton Road, surrounding commercial/industrial uses, and other urbanized uses. Construction activities of the proposed Project will include removal of approximately 5,500 cubic yards of soil, replaced by approximately 4,300 cubic yards of fill to bring the bridge area to grade with Barton Road. It is anticipated excavation will not exceed 16 feet in depth from ground level; as such, the potential to find undiscovered paleontological resources is considered low. Nonetheless, since the proposed Project is located in an area of high paleontological sensitivity, Mitigation Measure GEO-1 is required in the event that unanticipated paleontological resources are unearthed during Project construction.
Mitigation Measure GEO-1: Prior to issuance of grading permits, the City of Colton shall verify that the following note is included on the construction plans:
“If paleontological resources are encountered during the course of ground disturbance, work within 60 feet of the find shall be halted and an exclusionary buffer shall be established. A paleontologist shall be contacted to assess the find for scientific significance. No ground-disturbing activity within the 60-foot exclusionary buffer may occur without the consent of the paleontologist and the City of Colton. If determined to be significant, the fossil(s) shall be collected from the field. The paleontologist may also make recommendations regarding additional mitigation measures, such as paleontological monitoring. Scientifically significant resources shall be prepared to the point of identification, identified to the lowest taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. If scientifically significant paleontological resources are collected, a report of findings shall be prepared to document the collection.” This measure shall be implemented to the satisfaction of the City of Colton.
Implementation of Mitigation Measure GEO-1 would reduce impacts to paleontological resources to less than significant levels with mitigation incorporated by ensuring paleontological resources, if found, would be subject to scientific recovery and evaluation.
19 Geologic Map of the Riverside East and San Bernardino South Quadrangles, Riverside and San Bernardino Counties, California. Dibblee, T.W., and Minch, J.A. United States Geological Survey. 2002. https://ngmdb.usgs.gov/ngmbin/pdp/zui_viewer.pl?id=34334 (accessed October 9, 2020).
7.c
Packet Pg. 439 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 46 3.8 GREENHOUSE GAS EMISSIONS
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment?
b. Conflict with an applicable plan, policy, or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
The analysis in this section is based on the Air Quality Report that was prepared for the proposed Project in October 2020 (Appendix A: Air Quality Report).
a. Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less than Significant Impact. State CEQA Guidelines Section 15064(b) provides that the “determination of whether a project may have a significant effect on the environment calls for careful judgment on the part of the public agency involved, based to the extent possible on scientific and factual data,” and further states that an “ironclad definition of significant effect is not always possible because the significance of an activity may vary with the setting.” Climate change is a global issue and is described in the context of the cumulative environment. Therefore, the Project is considered in the context of multiple sectors and the combined efforts of many industries, including development. The primary greenhouse gas (GHG) emissions generated by the Project would be carbon dioxide (CO2) during Project construction. The following analysis represents an estimate of the Project’s GHG emissions through the quantification of CO2 emissions (Appendix A). It should be noted that methane and nitrous oxide emissions are also anticipated, but are negligible (i.e., less than 1 metric ton per year). The following Project activities were analyzed for their contribution to global CO2 emissions.
Lead agencies may elect to rely on thresholds of significance recommended or adopted by state or regional agencies with expertise in the field of global climate change (CEQA Guidelines Section 15064.7[c]). CEQA leaves the determination of significance to the reasonable of the lead agency and encourages lead agencies and publish thresholds of significance to use in determining the significance of environmental effects.
However, the City of Colton has not established specific quantitative significance threshold for GHG emissions for roadway improvement projects. For all nonindustrial projects, the SCAQMD proposes a screening threshold of 3,000 metric tons CO2 equivalent (MT CO2e) per year. The SCAQMD has determined that projects with emissions less than the screening threshold would not result in a significant cumulative impact. The 3,000 MT CO2e per year screening threshold is used in the analysis below to determine the impact associated with Project construction GHG emissions.
Construction and Operational Emissions. Greenhouse gas emissions associated with the proposed Project will occur over the short term from construction activities, consisting primarily of emissions from equipment exhaust. There would also be long-term GHG emissions associated with Project-related
7.c
Packet Pg. 440 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 47 changes to vehicular trips. The construction emissions were estimated for the proposed Project using the Sacramento Metropolitan Air Quality Management District’s Road Construction Model (RoadMod, Version 9.0.0). The results are presented below in Table 3.8.A: Construction Greenhouse Gas Emissions.
Table 3.8.A: Construction Greenhouse Gas Emissions
Construction Phase CO2e (MT/ Phase)
Grubbing/Land Clearing (lbs/day) 29.99
Grading/Excavating (lbs/day) 1,014.24
Drainage/Utilities/Sub-Grade (lbs/day) 449.59
Paving (lbs/day) 73.44
Maximum (tons/phases) 1,014.24
Total (tons/construction project) 1,727.58
Source: LSA, Air Quality Report, Table 4-3 Project Construction Greenhouse Gas Emissions, pg. 49, October 2020.
Note: MT=Metric tons; CO2e = Carbon dioxide equivalent; lbs/day = pounds/day As indicated in Table 3.8.A, Project construction would result in total emissions of 1,727.58 MT of CO2e, over the 14-month period of construction activity of the proposed Project. The amount of CO2e emissions generated during Project construction will not exceed the SCAQMD 3,000 MT CO2e per year screening threshold; as such, impacts will be less than significant and no mitigation measures are required.
The proposed Project will have low- to no-potential for an increase in GHG emissions. Construction emissions will be unavoidable, but there will likely be long-term GHG benefits from improved operation and smoother traffic flow along Barton Road and nearby roads. Table 3.8.B: Modeled Annual CO2 Emissions and VMT provides the amount of GHG emissions the proposed Project will generate over its life versus existing conditions (2019) versus a No Build Alternative in Opening Year (2023) and Horizon Year (2045) conditions.
Table 3.8.B: Modeled Annual CO2 Emissions and VMT
Alternative CO2 Emissions (metric tons/year) Annual Vehicle Miles Traveled (VMT)1 Existing/Baseline Year 2019 2.18 3,106,177
Opening Year (2023)
No Build 3.33 5,304,145
Project 2.89 5,304,145
Horizon Year (2045)
No Build 3.44 7,574,670
Project 3.27 7,574,670
Source: LSA, Air Quality Report, Table 4-4 Modeled Annual CO2 Emissions and Vehicle Miles Traveled, by Alternative, pg. 50, October 2020.
Note: Traffic data from Traffic Study Report, emissions calculated using EMFAC2017 with SAFE Rule adjustments factors. 1 Annual VMT values derived from Daily VMT values multiplied by 347, per CARB methodology. CO2 = carbon dioxide; VMT = vehicle miles traveled.
Table 3.8.B shows that the Project in the Opening Year and Horizon Year will generate more CO2 emissions compared to the existing conditions of 2019. The increased buildout of the City of Colton and City of Grand Terrace contributes to this increase and is not solely generated by implementation of the proposed Project.
When the proposed Project (in Opening Year 2023 and Horizon Year 2045 conditions) is compared to a No Build Alternative (in Opening Year 2023 and Horizon Year 2045 conditions), the proposed Project will generate lower amounts of CO2 emissions during Opening and Horizon Year conditions. This will occur due to the reduced congestion generated by implementation of the proposed Project. Therefore, impacts related to the generation of GHG emissions, either directly, indirectly or cumulatively, that may have a significant impact on the environment would be less than significant. No mitigation is required.
7.c
Packet Pg. 441 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 48 b. Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less than Significant Impact. The CARB, a part of the California Environmental Protection Agency is responsible for the coordination and administration of both federal and State air pollution control and climate change programs within California. In this capacity, the CARB conducts research, sets California Ambient Air Quality Standards, compiles emission inventories, develops suggested control measures, and provides oversight of local programs. The CARB establishes emissions standards for motor vehicles sold in California, consumer products, and various types of commercial equipment. While the City does not have an established Climate Action Plan, it is one of the partnership cities that participates in the San Bernardino County Regional Greenhouse Gas Reduction Plan.
The proposed Project is required to comply with Title 13-Section 2449 of the CCR and the CalRecycle Sustainable (Green) Building Program regulations, which include implementation of standard control measures for construction equipment emissions. Adherence to these regulations, including the implementation of Best Available Control Measures (BACMs) is a standard requirement for any construction or ground disturbance activity occurring within the South Coast Air Basin.
BACMs include, but are not limited to, requirements that the project proponent utilize only low-sulfur fuel (i.e., having a sulfur content of 15 parts per million by weight or less); ensure off-road vehicles (i.e., self-propelled diesel-fueled vehicles 25 horsepower and up that were not designed to be driven on road) limit vehicle idling to five minutes or less; register and label vehicles in accordance with the CARB Diesel Off-Road Online Reporting System; restrict the inclusion of older vehicles into fleets; and retire, replace, or repower older engines or install Verified Diesel Emission Control Strategies (i.e., exhaust retrofits).
Additionally, the construction contractor will recycle/reuse at least 50 percent of the construction material (including, but not limited to, proposed aggregate base, soil, mulch, vegetation, concrete, lumber, metal, and cardboard) and use “Green Building Materials,” such as those materials that are rapidly renewable or resource efficient, and recycled and manufactured in an environmentally friendly way, for at least 10 percent of the Project, in accordance with CalRecycle regulations.
As stated previously, the proposed Project is required to comply with SCAQMD Rule 431.2; Title 13-Section 2449 of the CCR; and CalRecycle/Green Building Program regulations, which include implementation of standard control measures for diesel equipment emissions. Through compliance with BACMs as part of applicable regulatory policies designed to reduce emissions, the proposed Project’s estimated GHG emissions (1,727.58 MT of CO2e/construction period would be less than the SCAQMD Tier 3 threshold of 3,000 MT CO2e/year, as detailed in Table 3.8.A) would support a more sustainable community in accordance with Executive Order S-3-05 and Assembly Bill (AB) 32. Therefore, the proposed Project will not generate greenhouse gas emissions that will have a significant impact on the environment, nor will the Project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases. Associated impacts will be less than significant and no mitigation is required.
7.c
Packet Pg. 442 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 49 3.9 HAZARDS AND HAZARDOUS MATERIALS
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
b. Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous materials
into the environment?
c. Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter
mile of an existing or proposed school?
d. Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code § 65962.5
and, as a result, would it create a significant
hazard to the public or the environment?
e. For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project
result in a safety hazard or excessive noise
for people residing or working in the project
area?
f. Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
g. Expose people or structures, either directly
or indirectly, to a significant risk of loss,
injury or death involving wildland fires?
The analysis in this section is based on the Initial Site Assessment (ISA) Barton Road Bridge Removal and Road Construction Project that was prepared for the proposed Project in July 2020 (Appendix D: Initial Site Assessment).
7.c
Packet Pg. 443 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 50 a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less than Significant Impact. Potentially hazardous materials such as fuels, oils, and remnant of creosote treated railroad ties may be transported to and from the Project site during the 14-month construction period.
The transport, use, and storage of hazardous materials during construction would be regulated by the City of Colton Fire Department, Grand Terrace Fire Service, under contract with the San Bernardino County Fire Department, in accordance with the City of Colton Local Hazard Mitigation Plan/City of Grand Terrace Hazard Mitigation Plan, and California Occupational Safety and Health Administration regulations.
Additionally, the United States Department of Transportation Office of Hazardous Materials Safety prescribes strict regulations for the safe transport of hazardous materials by truck and rail on State highways and rail lines, as described in Title 49 of the Code of Federal Regulations, and implemented by Title 13 of the CCR.
As detailed in the City of Colton Local Hazard Mitigation Plan and City of Grand Terrace Hazard Mitigation Plan, the transport, use, and storage of hazardous materials during site preparation and project operation would be conducted pursuant to all applicable local, State, and federal laws, and in cooperation with the San Bernardino County Department of Environmental Health Services, Hazardous Materials Division.
Ground disturbance would include removal of the existing Barton Road Bridge, grubbing of vegetation, excavation, and placement of fill up to Barton Road grade to make a new roadbed in place of the removed bridge. Due to the relatively small size of the Project site and scale of proposed construction activities, construction of the Project is not expected to require hazardous materials or a mixture containing a hazardous material in a quantity at any one time above the thresholds described in California Health and Safety Code Section 25503 and Section 25507(a) (1) through (6).
Compliance with all applicable laws and regulations during Project construction and operation would ensure impacts associated with the routine transport, use, storage, or disposal of hazardous materials remain less than significant. No mitigation is required. b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Less than Significant Impact with Mitigation Incorporated. As described previously, the proposed Project would not use or handle significant quantities of hazardous materials. The Initial Site Assessment. prepared for the proposed Project included a records review of the Project site that included selected federal and state environmental regulatory databases as well as responses from state and local regulatory agencies. The Project site was not identified in the current regulatory databases as being a site of hazardous materials concern. The facilities listed in the databases do not appear to represent recognized environmental conditions (REC) to the Project site, with the exception of the following:
• Soils with “black, trace petroleum odor” were encountered in geotechnical boring B-3 (located approximately 100 feet west of the bridge) at a depth of 20 feet below ground surface.
A Limited Site Investigation and Aerially Deposited Lead (ADL) assessment of the Project site was conducted in December 2000. The objective of this investigation was to evaluate the presence of ADL within the shallow shoulders of the unpaved roadway shoulders and evaluate the presence of total
7.c
Packet Pg. 444 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 51 petroleum hydrocarbon (TPH) and volatile organic compound concentrations above laboratory reporting limits. During the investigation, nine shallow soil borings (SB-1 through SB-9) were conducted to a depth of 2 feet below ground surface (bgs) (using hand-auger tooling). One deep soil boring (B-2) was advanced to 31.5 feet bgs (using a truck-mounted hallow-stem auger drill rig). Representative soil samples from each boring were collected, with each documented for soil lithology, color, moisture content, and staining.
The soils encountered generally consisted of alternating layers of silty sand and sand silt. A sandy silt with engineered gravel fill material was collected within 12.5 inches of the deep boring. No soil staining was observed from the soils retrieved from the borings. Twenty-six samples from the borings were selected for laboratory analysis.
VOC concentrations were below the specific laboratory report limit (RL) for soil samples analyzed from the deep boring (20 bgs.) TPH-diesel range organics (DRO) and TPH-motor oil range organics (MORO) were detected in soil boring B-2 at a depth of 20 feet bgs; however, the detected TPH-DRO and TPH-MORO concentrations were several orders of magnitude below their respective environmental screening limits for residential and commercial use.
20 Soil samples were collected to evaluate ADL. Total lead concentrations were detected above the laboratory RL in all but four samples. The detectable concentrations of total lead, total threshold limit concentration (TTLC), ranged from 3.1 to 85 mg/kg, with the maximum total lead concentration in the sample collected at 0.5 feet bgs from soil SB-08-0.5. Further lead analysis, indicated a Soluble Threshold Limit Concentration (STLC) of 6.8 mg/l in sample SB-06-0.5, while the sample one foot bsg at this boring indicated an STLC below the laboratory RL. Elevated lead concentrations, interpreted as ADL, were limited to soil samples collected from 0.5 foot bsg. Total lead concentrations were below the environmental screening limits for commercial use.
Per the investigation, “Based on the field observations and laboratory data, evidence of significant impairment (was) not identified in the areas accessible and investigated, and at the time the investigation was conducted.” Additional assessment of soil in the project area does not appear warranted at this time.
While soil impacts above regulatory screening levels or above the applicable residential and commercial screening levels were not identified at the locations explored, due to current and historical uses, there is the potential that other areas within the project limits may have impacts. Mitigation Measure HAZ-1 has been identified to address potential issues related to any affected soils that may be encountered during the course of project construction.
Mitigation Measure HAZ-1: Prior to the commencement of Project construction, a soil management plan shall be developed to identify the appropriate and applicable procedures to be followed with respect to worker health and safety during future excavations and construction activities in areas of potential soil impacts.
The soil management plan shall detail the appropriate and applicable local, State, and federal regulations regarding the proper characterization, treatment, and/or disposal of any impacted soils encountered during excavation or construction activities. Any impacted soil encountered shall be appropriately handled pursuant to the project soil management plan.
20 Limited Site Investigation and Aerially Deposited Lead Report Barton Road Bridge Removal and Road Construction Project Project No. BRLS-5065(024); Bridge No. 54C-0379, Terracon, April 6, 2021.
7.c
Packet Pg. 445 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 52 Reconnaissance of the Project site resulted in observation of a stormwater drain near the easement located at 21800 Barton Road, on the northeastern perimeter of the site. No evidence of chemical waste disposal, noxious odors, or other indications of releases were observed near the vicinity of the stormwater drain. Based on observation, the drain does not constitute a REC to the site. One gas pipeline marker (Southern California Gas Company) at the northeastern portion of the Barton Road Bridge, and associated pipeline on the underside of the bridge was observed. It was determined that the gas pipe marker and pipeline does not constitute a REC to the site.
A pole-mounted transformer, owned and maintained by Southern California Edison is located on the southern perimeter of the site (southeast of the Barton Road Bridge); however, no information with regard to polychlorinated biphenyls content of the transformer fluids was observed. Evidence of current or prior release of polychlorinated biphenyls was not observed in the vicinity of the electrical equipment during the site reconnaissance; as such, the pole-mounted transformer does not represent a REC to the site.
Miscellaneous household trash (plastic shopping bags, food wrappers, paper drinking cups) were observed scattered throughout the Barton Road Bridge underpass, on the central portion of the Project site. Based on visual observations, the trash did not appear to be hazardous in nature and no evidence of chemical waste disposal, noxious odors, or other indications of releases were observed near the vicinity of the trash. As such, the household trash does not constitute a REC to the site.
Remnants of 12 railroad ties were observed in the area of Barton Road Bridge underpass, on the central portion of the Project site. The railroad ties appeared to be creosote treated, broken and deteriorating.
As such, the railroad ties do not constitute a REC to the Project site.
As part of the Initial Site Assessment an asbestos survey and lead-based paint (LBP) survey of the Project site was conducted. Suspect asbestos-containing material (ACM) was observed during the field surveys on the concrete abutment, concrete retaining wall, concrete encase around valve and pipe, black asphalt road, black creosote, multicolor texture coat on abutment, and black pipe wrap on 12-inch diameter pipe.
No ACM was detected in the samples collected for analysis. The mastic associated with the road reflectors on Barton Road are assumed to be ACM. Suspect LBP was observed during the site field surveys on the gray pain (guard rail and metal cross beam), white paint (concrete with valve under the bridge, metal bollard on the northeastern portion of the road), yellow paint (gas pipe under the bridge), and the red with blue paint (on the curb on the northwestern portion of the site). Lead and chromium were detected in the samples that were analyzed. Implementation of Mitigation Measure HAZ-2 would ensure that ACMs, LBPs and chromium are appropriately collected during Project construction activities and properly removed from the site.
Mitigation Measure HAZ-2: During construction, the Project contractor shall comply with the occupational Safety and Health Administration Standard 1926.6 related to lead abatement, and all other applicable state and federal requirements for handling and disposal of LBP, ACM, and universal wastes. AS ACM, LBP and chromium has been detected in features existing on the Project site, these materials, during Project construction, shall be abated and removed from the site in accordance with all applicable regulations, including Occupational Safety and Health Administration requirements. The City of Colton shall verify that the abatement and removal of ACM, LBP and chromium has been completed prior to any development activities on the Project site.
7.c
Packet Pg. 446 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 53 The Project would be constructed and operated in accordance with applicable local, State, and federal laws pertaining to hazardous materials. Since the proposed Project uses would not include significant quantities of hazardous materials, and the Project site does not currently contain any recognized environmental conditions or historical recognized environmental conditions, release of hazardous materials into the environment from construction and operation of the Project is not reasonably foreseeable. Implementation of Mitigation Measures HAZ-1 and HAZ-2 would also reduce the potential impacts associated with soil contaminated with “black, trace petroleum odor”, ACM, LBP, and chromium in demolition materials. Therefore, impacts would be less than significant with implementation of mitigation measures.
c. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less than Significant Impact. The nearest school to the Project site is Grand Terrace Elementary School (12066 Vivienda Avenue Grand Terrace) approximately 0.26 mile to the northeast. Interstate 215 is between the proposed Project and Grand Terrace Elementary School. The proposed Project during construction and operation would not emit hazardous materials or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts will be less than significant and not mitigation is required.
d. Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
No Impact. Pursuant to Government Code Section 65962.5, the Hazardous Waste and Substances Sites List has been compiled by the California Environmental Protection Agency Hazardous Materials Data Management Program. The Department of Toxic Substances Control (DTSC) compiles information from subsets of the following databases to make up the Cortese List, which includes, but is not limited to:
1. The DTSC list of contaminated or potentially contaminated hazardous waste sites listed in the California Sites database, formerly known as ASPIS, is included;
2. The California State Water Resources Control Board listing of leaking underground storage tanks is included; and
3. The California Integrated Waste Management Board list of sanitary landfills that have evidence of groundwater contamination or known migration of hazardous materials (formerly WB-LF, now AB 3750).
According to the Project specific Initial Site Assessment none of the sites within 500 feet of the Project site nor the Project site itself were included on the Hazardous Waste and Substances Sites (Cortese) List, DTSC (GeoTracker), or RWQCB (EnvironStor) databases. Therefore, no impact related to the Cortese List or other governmental databases compiled pursuant to Government Code Section 65962.5 would occur and no mitigation is required.
e. For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No Impact. The Project site is located approximately 5.57 miles northeast of the Flabob Airport in the City of Jurupa Valley and 5.54 miles southwest of the San Bernardino International Airport, which are the
7.c
Packet Pg. 447 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 54 nearest airports. The Project is not within an airport land use plan21,22 or within two miles of a public airport or public use airport. Therefore, the Project would not result in a substantial safety hazard related to airports. No impact would occur and no mitigation is required. f. Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less than Significant Impact. During construction of the proposed Project, Barton Road will be temporarily closed between Terrace Avenue and Grand Terrace Avenue. The Cities of Colton and Grand Terrace consider Barton Road an emergency evacuation route in their General Plans. As a condition of approval for the Project, a detour plan will be prepared and distributed to emergency service, fire department, and police department staff that provides service to the Project site and surrounding uses. .
The detour will route traffic around the construction zone on Barton Road via S. Terrace Avenue, De Berry Street, and S. La Crosse Avenue throughout the duration of construction. Once the proposed Project is complete, Barton Road between Terrace Avenue and Grand Terrace Avenue and vehicle flow conditions will be restored back to near existing conditions. Based on the above discussion, implementation of the proposed Project would not impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan. Impacts would be less than significant and no mitigation measures are required.
g. Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Less than Significant Impact. The Project site is not located within or immediately adjacent to a State Responsibility Area or Local Responsibility Area (LRA) designated as a Very High Fire Hazard Severity Zone (VHFHSZ) by Cal Fire.23 The western boundary of the Project site is approximately 995 feet east of an LRA designated as a VHFHSZ. The City of Colton Fire Department provides fire suppression and emergency medical services to the City. Fire Station 213 located approximately 1.28 miles to the north at 1100 South The closest fire station is in Colton on La Cadena Drive which will serve the Project site. The City of Grand Terrace is within the service area of the San Bernardino County Fire Department for fire and rescue services. Fire Station 23 is located at 22582 City Center Court in Grand Terrace and is approximately 1 mile east of the Project site. The Project site is therefore adequately served by fire departments.
The proposed Project will remove the Barton Road Bridge (and replace it with fill and new roadbed) which is susceptible to burning in a fire due to its composition. As such, once the proposed Project is complete, Barton Road will be less susceptible to fire destruction in the area over the abandoned UPRR corridor. The proposed Project does not include features that will expose people or structure (either directly or indirectly) to a significant risk of loss, injury or death involving wildland fire. Impacts will be less than significant and no mitigation measures are required.
21 San Bernardino International Airport Authority. 2010. Airport Layout Plan Narrative Report for San Bernardino International Airport. September 22. 22 Riverside County. 2004. Flabob Airport, Riverside County ALUCP—West County Airports Background Data. 23 California State Geoportal, FHSZ in LRA, Website: https://gis.data.ca.gov/datasets/CALFIRE-Forestry::fhsz-in-lra?geometry=- 117.349%2C34.031%2C117.309%2C34.038. Accessed on October 8, 2020.
7.c
Packet Pg. 448 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 55 3.10 HYDROLOGY AND WATER QUALITY
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Violate any water quality standards or
waste discharge requirements or otherwise
substantially degrade surface or
groundwater quality?
b. Substantially decrease groundwater
supplies or interfere with groundwater
recharge such that the project may impede
sustainable groundwater management in
the basin?
c. Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river or through the addition of impervious
surfaces, in a manner which would:
i. Result in substantial erosion or siltation
on or off site?
ii. Substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on or off
site?
iii. Create or contribute runoff water which
would exceed the capacity of existing or
planned storm water drainage systems
or provide substantial additional sources
of polluted runoff?
iv. Impede or redirect flood flows?
d. Result in flood hazard, tsunami, or seiche
zones, or risk release of pollutants due to
project inundation?
e. Conflict with or obstruct implementation of
a water quality control plan or sustainable
groundwater management plan?
The analysis in this section is based on the Drainage Study for Barton Road Improvements that was prepared for the proposed Project in January 2020 (Appendix E: Drainage Study).
7.c
Packet Pg. 449 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 56 a. Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality?
Less than Significant Impact. The Cities of Colton and Grand Terrace are co-permittees under Santa Ana Regional Water Quality Control Board (Santa Ana RWQCB) Order number R8‐2010‐0036, NPDES Permit No. CAS618036, also known as the Municipal Separate Storm Sewer System or MS4 permit. The San Bernardino County Water Quality Management Plan was developed to implement compliance with the MS4 permit. The construction of the proposed Project would require ground-disturbing activities that could result in eroded soils and other pollutants entering watersheds, such as the Santa Ana River watershed. Pollutants, such as sediment, nutrients, heavy metals, toxic organics, trash and debris, and contaminants, may be conveyed by storm runoff from impermeable surfaces (e.g., buildings, streets, and parking lots). The City of Colton implements NPDES requirements for surface water discharge for all qualifying activities.
Short-Term Construction. The Project site is in approximately 2.8 acres in size (excess of one acre); therefore, the Project is required to obtain coverage under an NPDES Construction Permit, which includes the submittal of a Notice of Intent (NOI) application to the Santa Ana RWQCB, the receipt of a Waste Discharge Identification Number from the SWRCB, and the preparation of a Storm Water Pollution Prevention Plan (SWPPP) for construction discharges. An SWPPP is a written document that describes the construction operator’s activities to comply with the requirements in the NPDES permit. The SWPPP is intended to facilitate a process whereby the operator evaluates potential pollutant sources at the site and selects and implements Best Management Practices (BMPs) designed to prevent or control the discharge of pollutants in storm water runoff. During the construction period, the Project applicant would use a series of BMPs to reduce erosion and sedimentation. These measures may include the use of gravel bags, silt fences, check dams, hydroseed, and soil binders. The construction contractor would be required to operate and maintain these controls throughout the duration of on-site activities. In addition, the construction contractor would be required to maintain an inspection log and have the log on site to be reviewed by the City of Colton and representatives of the Santa Ana RWQCB.
An NPDES permit would generally specify an acceptable level of a pollutant or pollutant parameter in a discharge (for example, a certain level of bacteria). The permittee may choose which technologies to use to achieve that level. Some permits, however, do contain certain generic BMPs. Table 3.10.A: General Best Management Practices lists BMPs for runoff control, sediment control, erosion control, and housekeeping that may be used during the construction of the proposed Project.
Table 3.10.A: General Best Management Practices
Runoff Control Sediment Control Erosion Control Good Housekeeping • Minimize clearing
• Preserve natural
vegetation
• Stabilize drainage
ways
• Install perimeter controls
• Install sediment trapping
devices
• Inlet protection
• Stabilize exposed soils
• Protect steep slopes
• Complete construction in
phases
• Create waste collection
area
• Put lids on containers
• Clean up spills
immediately
Source: National Menu of Stormwater Best Management Practices. United States Environmental Protection Agency. https://www.epa.gov/ npdes/national-menu-best-management-practices-bmps-stormwater#constr (accessed July 16, 2019). More detailed Best Management Practices are available at this web site.
The implementation of NPDES permits ensures that the State’s mandatory standards for the maintenance of clean water and the federal minimums are met. Through implementation of the BMPs detailed in an
7.c
Packet Pg. 450 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 57 SWPPP and periodic inspections by the Santa Ana RWQCB staff, water quality impacts during construction would be less than significant and no mitigation is required.
Long-Term Operation. The proposed Project site is located within the jurisdiction of the Santa Ana RWQCB. The overall Project area drains in the westerly direction; however, the abandoned UPRR railroad corridor drains in the northern direction towards the Santa Ana River. The I-215/Barton Road interchange constructed inlets at the easterly limits of the Project boundary and has included several new storm drain inlets and subsurface pipe to collect the runoff from the interchange area. The proposed Project will implement a design concept that perpetuates the existing drainage pattern of the area in order not to impact existing downstream properties.
The Project area has been divided into four drainage areas. Table 3.10.B: Pre-Project Condition Peak Flow Rate for Drainage Areas shows the drainage areas of the Project along with their 100-year flow rate and 10-year flow rate under pre-project construction conditions.
Table 3.10.B: Pre-Project Condition Peak Flow Rate for Drainage Area Subarea Drainage Area (acres) 100-Year Flow Rate (ft3/s) 10-Year Flow Rate (ft3/s) A 0.44 1.42 2.5
B 6.11 9.7 5.9
C 0.4 1.3 0.9
D 0.4 1.2 0.8
Source: JLC Engineering and Consulting, Inc. Drainage Study for Barton Road Improvements, Table 1, pg. 2, March 2, 2020.
As part of the design, the proposed Project will be required to construct storm drain system improvements to ensure storm drain infrastructure has been sized sufficiently to intercept the Project stormwater runoff.
The drain system improvements are as follows:
• Construction of a 30-inch culvert that will be located under the proposed fill area that will replace the existing Barton Road Bridge. The 30-inch culvert will allow flows to be perpetuated from the south side of Barton Road to the north side of Barton Road in order to sustain the existing drainage pattern. • Construction of two inlet structures that will be located west of the existing Barton Road Bridge. The two inlets will intercept the street surface flow and convey the stormwater runoff to a proposed water quality BMP. After the low flows are treated, the runoff will be conveyed into the proposed 30-inch storm drain.
• Construction of an 18-inch storm drain that will convey the runoff from the two existing inlets into the proposed 30-inch culvert. The existing design connects to an existing circular inlet structure that connects to an existing 8-inch outlet pipe. This design is substandard and must be repaired to provide adequate flood protection for Barton Road.
Table 3.10.C: Post-Project Condition Peak Flow Rate for Drainage Areas shows the peak flow 100-year and 10-year rates for the Project drainage areas once the above design features are in place as part of the proposed Project.
The drainage infrastructure improvements for the proposed Project, as indicated in Table 3.10.C, results in a decrease in Area A flow rates and an increase in flow rates for Area B. The changes in the flowrates for these subareas are attributed to the altering of drainage areas that result from the removal of the Barton Road Bridge and the high point that exists over the railroad corridor. Overall, the changes in flow
7.c
Packet Pg. 451 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 58 rate are insignificant and will not adversely affect downstream property owners or downstream receiving waters. Receiving waters will include Santa Ana River Reach 4, Santa Ana River Reach 3, Prado Dam, Santa Ana River Reach 2, Santa Ana River Reach 1, and the Pacific Ocean. The EPA-approved 303(D) List of Water Quality Limited Segments identifies indicator bacteria, coliform bacteria, copper, and lead as 303(D) listed impairments for downstream receiving waters. To address potential water contaminants, the proposed Project would be required to comply with applicable federal, State, and local water quality regulations.
Table 3.10.C: Post-Project Condition Peak Flow Rate for Drainage Area Subarea Drainage Area (acres) 100-Year Flow Rate (ft3/s) 10-Year Flow Rate (ft3/s) A 0.15 0.41 0.26
B 6.56 12.2 7.5
C 0.4 1.2 0.8
D 0.4 1.2 0.8
Source: JLC Engineering and Consulting, Inc. Drainage Study for Barton Road Improvements, Table 2, pg. 2, March 2, 2020.
Standard Conditions: No mitigation is required; however, compliance with the provisions of the NPDES permit and incorporation of a Final Water Quality Management Plan Low Impact Development (LID) BMPs are regulatory requirements that apply to all projects. These requirements are detailed below as Standard Conditions (SC) HYD-1 through HYD-3 to be included in the conditions of approval for the proposed Project.
Standard Condition HYD-1: Prior to the issuance of a grading permit, the City of Colton Public Works Department shall file and obtain a Notice of Intent (NOI) with the RWQCB in order to be in compliance with the State National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit for discharge of surface runoff associated with construction activities. Evidence that this has been obtained (i.e., a copy of the Waste Discharger’s Identification Number) shall be retained by the City of Colton and submitted to Caltrans for coverage under the NPDES General Construction Permit. The NOI shall address the potential for an extended and discontinuous construction period based on funding availability. This measure shall be implemented to the satisfaction of the Director of the City Engineering Division of the Public Works Department or designee.
Standard Condition HYD-2: Prior to the issuance of a grading permit, the City of Colton Public Works Department shall prepare a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire construction period. In addition, the SWPPP shall emphasize structural and nonstructural Best Management Practices (BMPs) to control sediment and non-visible discharges from the Project site. The SWPPP shall include inspection forms for routine monitoring of the site during both the grading and construction phases to ensure National Pollutant Discharge Elimination System (NPDES) compliance and that additional BMPs and erosion control measures will be documented in the SWPPP and utilized if necessary. The SWPPP shall address the potential for an extended and discontinuous construction period based on funding availability. The SWPPP shall be kept on site for the entire duration of Project construction and shall be available to the local RWQCB for inspection at any time. BMPs to be implemented may include the following:
• Sediment discharges from the site may be controlled by the following: sandbags, silt fences, straw wattles and temporary basins (if deemed necessary), and other discharge control devices. The construction and condition of the BMPs shall be periodically inspected during construction, and repairs shall be made when necessary as required by the SWPPP.
7.c
Packet Pg. 452 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 59 • Materials that have the potential to contribute to non-visible pollutants to storm water must not be placed in drainage ways and must be contained, elevated, and placed in temporary storage containment areas.
• All loose piles of soil, silt, clay, sand, debris, and other earthen material shall be protected in a reasonable manner to eliminate any discharge from the site. Stockpiles shall be surrounded by silt fences and covered with plastic tarps.
• In addition, the construction contractor shall be responsible for performing and documenting the application of BMPs identified in the SWPPP. Weekly inspections shall be performed on sandbag barriers and other sediment control measures called for in the SWPPP. Monthly reports and inspection logs shall be maintained by the contractor and reviewed by the City of Colton and the representatives of the State Water Resources Control Board. In the event that it is not feasible to implement specific BMPs, the City of Colton can make a determination that other BMPs will provide equivalent or superior treatment either on or off site.
This measure shall be implemented to the satisfaction of the Director of the City of Colton Public Works Department or his/her designee.
Standard Condition HYD-3: Prior to issuance of a grading permit, the City of Colton Public Works Department shall submit evidence to Caltrans and put into the Project’s administrative record that the Low Impact Development (LID) Best Management Practices (BMPs) specified in a Final Water Quality Management Plan (a Preliminary WQMP) shall be written into the grading and development plans submitted to the City for review and approval to manage water quality and hydrologic effects of the proposed Project. Specifically, the LID BMPs shall be implemented to ensure the Project meets or exceeds the minimum design capture volume of the site.
Periodic maintenance of LID BMPs during Project operation shall be in accordance with the schedule outlined in a Final WQMP. This measure shall be implemented to the satisfaction of the Director of the City of Colton Public Works Department or designee.
The Preliminary WQMP will be prepared and approved as a routine action during the processing of the project by the City; therefore, it is reasonable to conclude that the required measures and features detailed in a Final WQMP to safeguard water quality would be incorporated into the proposed Project.
Adherence to Standard Conditions HYD-1 through HYD-3 and the requirements included in the NPDES permit, SWPPP, and a Final WQMP would ensure potential water quality impacts remain less than significant. No mitigation is required.
b. Substantially decrease groundwater supplies or interfere with groundwater recharge such that the project may impede sustainable groundwater management in the basin? Less than Significant Impact. The Project site is located within the Riverside Highland Water Company (RHWC) service area, and the San Bernardino Valley Municipal Water District. According to the San Bernardino Valley Municipal Water District 2015 Urban Water Management Plan (UWMP), the RHWC’s water supply consists entirely of groundwater extracted from the San Bernardino Basin Area (Bunker Hill Basin portion), the Rialto-Colton Basin, and the Riverside Basin (Riverside North Basin portion).24 The proposed Project includes removal of Barton Road Bridge over the abandoned UPRR corridor, replacement of the bridge with fill and a new roadbed to connect Barton Road in place of where the bridge
24 San Bernardino Valley Municipal Water District. 2015 Urban Water Management Plan. Page 15-13. June 2016.
7.c
Packet Pg. 453 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 60 used to be, installation of drainage improvements, and, installation of sidewalks and Class II bicycle lanes to promoted connectivity for non-motorized transportation between the City of Colton and City of Grand Terrace. All of the actions associated with the proposed Project will occur along the existing Barton Road between South Terrace Avenue and Grand Terrace Road. Therefore, the Project would not substantially contribute to groundwater depletion, nor would it interfere with groundwater recharge. The Project site is not located within a designated groundwater recharge area and it does not propose direct additions or withdrawals of groundwater. Furthermore, the proposed construction does not reach depths that would impair or alter the direction or rate of flow of groundwater.
Through implementation of Standard Condition HYD-3, the LID BMPs specified in a Final WQMP would be implemented to treat the Project site’s minimum design capture volume and on-site storm water runoff will be conveyed off-site in a similar manner as occurring under existing conditions. Periodic maintenance of any BMPs during Project operation will be in accordance with the schedule outlined in the WQMP. Therefore, through implementation of Standard Condition HYD-3, impacts associated with groundwater supplies would be less than significant. No mitigation is required. c. Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i Result in substantial erosion or siltation on or off site? ii Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on or off site?
iii Create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff? iv Impede or redirect flood flows?
i. Less than Significant Impact. There are no known drainages, ponds, or other places where water collects on the Project site. The overall Project area drains in a westerly direction; however, the abandoned UPRR railroad corridor drains in a northern direction towards the Santa Ana River. The I215/Barton Road interchange constructed inlets at the easterly limits of the Project boundary and has included several new storm drain inlets and subsurface pipes to collect the runoff from the interchange area. The proposed Project will implement a design concept that perpetuates the existing drainage pattern of the area in order not to impact existing downstream properties. Pursuant to Standard Condition HYD-2, the City of Colton will prepare an SWPPP prior to the issuance of grading permits. The SWPPP will include a surface water control plan and erosion control plan citing specific measures to control on-site and off-site erosion during the entire grading and construction period. In addition, the SWPPP will emphasize structural and nonstructural BMPs to control sediment and nonvisible discharges from the site. The SWPPP would include inspection forms for routine monitoring of the site during the 14-month construction period to ensure NPDES compliance and that additional BMPs and erosion control measures will be documented in the SWPPP and utilized if necessary. The SWPPP would address the potential for an extended and discontinuous construction period based on funding availability. Upon completion of construction, the Project site would be paved (similar to existing conditions), which would prevent erosion and siltation of sediments. Through implementation of Standard Condition HYD-2, the Project would not result in substantial erosion or siltation on or off site. Impacts would be less than significant and no mitigation is required.
7.c
Packet Pg. 454 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 61 ii. Less than Significant Impact. Pursuant to Standard Condition HYD-3, the LID BMPs specified in the Preliminary WQMP would be implemented to convey the Project site’s minimum design capture volume. According to the project-specific Hydrology Study, development of the proposed Project would result in a decrease in Area A flow rates and an increase in flow rates for Area B during 100- year flows. The changes in the flowrates for these subareas are attributed to the altering of drainage areas that result from the removal of the Barton Road Bridge and the high point that exists over the abandoned UPRR corridor. Overall, the changes of flow rate is insignificant and will not adversely affect downstream property owners or downstream receiving waters considering the anticipated 100- year peak flow rate for the Santa Ana River of 140,000 cubic feet per seconds. Periodic maintenance of any required BMPs during Project operation would be in accordance with the schedule outlined in a Preliminary WQMP. With implementation of Standard Conditions HYD-2 and HYD-3, impacts related to substantial alteration of the existing drainage pattern of the site or area or substantial increase in the rate or amount of surface runoff in a manner that would result in on-site or off-site flooding would be less than significant. No mitigation is required. iii. Less than Significant Impact. The CWA delegates authority to the states to issue NPDES permits for discharges of storm water from construction, industrial, and municipal entities to Waters of the United States. The purpose of the MS4 permit is to meet the Santa Ana RWQB’s requirements to mitigate for the negative impact of increases in storm water runoff caused by new development and redevelopment. The project storm water discharge rates cannot exceed the pre-development runoff condition for 2-year 24-hour storm total or the 85th percentile 24-hour storm runoff event by more than five percent to be in compliance with the MS4 post-construction and site design requirements.
The Project is 2.8 acres in size (over one acre in size) and therefore is required to have coverage under the State’s General Permit for Construction Activities (SWPPP). Pursuant to Standard Condition HYD2, a project-specific SWPPP will be prepared and detailed BMPs will be implemented during construction to reduce/eliminate adverse water quality impacts. All impacts related to runoff during site preparation, and construction would be addressed by the SWPPP.
The overall Project area drains in a westerly direction; however, the abandoned UPRR railroad corridor drains in a northern direction towards the Santa Ana River. The I-215/Barton Road interchange constructed inlets at the easterly limits of the Project boundary and has included several new storm drain inlets and subsurface pipes to collect the runoff from the interchange area. The proposed Project will implement a design concept that perpetuates the existing drainage pattern of the area in order not to impact existing downstream properties.
Pursuant to Standard Condition HYD-3, the LID BMPs specified in a Final WQMP will be implemented to treat the Project site’s minimum design capture volume. Additional Project design features, such as maintenance of existing surface flows across the Project site through the proposed BMPs would further maintain the site’s existing drainage pattern and prevent additional sources of polluted runoff.
Periodic maintenance of any required drainage facilities during Project operation will be in accordance with the schedule outlined in the Preliminary WQMP.
Any sources of storm water pollution will be addressed through adherence to NPDES and MS4 permit requirements. Implementation of Standard Conditions HYD-2 and HYD-3 will ensure polluted runoff during site preparation and construction would be addressed by the SWPPP. Therefore, impacts related to the creation or contribution of runoff water that would exceed the capacity of existing or
7.c
Packet Pg. 455 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 62 planned storm water drainage systems or provide substantial additional sources of polluted runoff would be less than significant. No mitigation is required. iv. Less than Significant Impact. According to the Federal Emergency Management Agency (FEMA) National Flood Hazard Layer, the Project site is located within Panel 06071C8687J in Zone X, identified as an “Area of Minimal Flood Hazard.” The overall Project area drains in a westerly direction; however, the abandoned UPRR railroad corridor drains in a northern direction towards the Santa Ana River. The I-215/Barton Road interchange constructed inlets at the easterly limits of the Project boundary and has included several new storm drain inlets and subsurface pipes to collect the runoff from the interchange area. The proposed Project will implement a design concept that perpetuates the existing drainage pattern of the area in order not to impact existing downstream properties. The drainage infrastructure improvements for the proposed Project, as indicated in Table 3.10.C, results in a decrease in Area A flow rates and an increase in flow rates for Area B. The changes in the flowrates for these subareas are attributed to the altering of drainage areas that result from the removal of the Barton Road Bridge and the high point that exists over the railroad corridor. Overall, the changes of flow rate is insignificant and will not adversely affect downstream property owners or downstream receiving waters. Therefore, the Project would not impede or redirect flood flows. Impacts would be less than significant and no mitigation is required.
d. Result in flood hazard, tsunami, or seiche zones, or risk release of pollutants due to project inundation?
Less than Significant Impact. According to the FEMA National Flood Hazard Layer, the Project site is located within Panel 06071C8687 in Zone X, identified as an “Area of Minimal Flood Hazard.” According to the City’s General Plan EIR, there are no major dams located within the City of Colton.25 The closest dam inundation area is approximately 2.5 miles to the north east of the Project site along the Santa Ana River floodplain in the vicinity of I-10/I-215 interchange. Considering that the Project site is not near this dam inundation zone, the failure of Seven Oaks Dam and failure of Levee ID 4964 will not be a significant threat to the proposed Project site. In the event that local sheet flooding occurs, as it has in the past, storm drain improvements implemented as part of the proposed Project will be constructed to convey water off-site similar to existing conditions.
There would be a less than significant impact regarding inundation of the proposed Project site by a tsunami because the Project site is approximately 42 miles northeast of the Pacific Ocean. The proposed Project is not located near a lake or open body of water; accordingly, a seiche occurrence that could affect the Project site is highly unlikely. Therefore, impacts associated with release of pollutants due to Project inundation would be less than significant. No mitigation is required. e. Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less than Significant Impact. As detailed in response to Checklist Question 3.10b, the proposed Project would not substantially contribute to groundwater depletion, nor would it interfere with groundwater recharge. The Project does not propose direct additions or withdrawals of groundwater, as it is a bridge removal and road improvement Project along Barton Road. Furthermore, construction proposed by the
25 City of Colton. General Plan EIR, Exhibit 4.9-3 Hydrologic Hazards, page 4.9-35, May 2013.
7.c
Packet Pg. 456 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 63 Project would not involve construction at depths that would impair or alter the direction or rate of groundwater flow.
The implementation of NPDES permit in accordance with Standard Condition HYD-1 ensures that the State’s mandatory standards for maintenance of clean water and the federal minimums are met. Through implementation of the BMPS detailed in an SWPPP pursuant to Standard Condition HYD-2, water quality impacts would be less than significant during construction. Since the Project would not inhibit groundwater recharge potential and would only result in minimal potential increase in the demand for water during construction, the Project would not conflict with any applicable water quality control plan or sustainable groundwater management plan. Impacts would be less than significant and no mitigation is required.
Through implementation of Standard Condition HYD-3, the LID BMPs specified in a Final WQMP will be implemented to treat the Project site’s minimum design capture. Periodic maintenance of any BMPs during Project operation will be in accordance with the schedule outlined in the WQMP. Therefore, through implementation of Standard Condition HYD-3, impacts from conflict with or obstruction of a water quality control plan or sustainable groundwater management plan would be less than significant.
No mitigation is required.
7.c
Packet Pg. 457 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 64 3.11 LAND USE AND PLANNING
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Physically divide an established community?
b. Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect?
a. Physically divide an established community?
No Impact. The Project site is currently occupied by Barton Road and Barton Road Bridge. The proposed Project includes removal of the Barton Road Bridge over the abandoned UPRR corridor and will be replaced by fill to build a new portion of Barton Road. The Project will also include sidewalks and new Class II bicycle lanes which will add connectivity along Barton Road for pedestrians and bicyclists. The proposed Project would not physically divide an established community. No impact related to the physical division of an established community would occur and no mitigation is required. b. Cause a significant environmental impact due to a conflict with any applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less than Significant Impact. The proposed Project will be developed on the existing Barton Road on the boundary of the cities of Colton and Grand Terrace. The existing Barton Road Bridge spanning the abandoned UPRR corridor will be removed and replaced with fill and a new portion of Barton Road. The City of Colton General Plan Mobility Element includes discussion about improvements to Barton Road which are consistent with the proposed Project.26 The Project site is not zoned; however, the portion of parcel 0275-223-16-0000 (located in Grand Terrace) that will be acquired by the proposed Project is zoned Restricted Manufacturing by the City of Grand Terrace Zoning Code. Once the sliver portions of the parcel are acquired, the land will no longer be zoned Restricted Manufacturing and will be considered right-ofway for Barton Road. Implementation of the proposed Project would not cause a significant environmental impact due to a conflict with any applicable land use plan, policy or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Impacts will be less than significant and no mitigation is required.
26 City of Colton, City of Colton General Plan Mobility Element, August 20, 2013.
7.c
Packet Pg. 458 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 65 3.12 MINERAL RESOURCES
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the State?
b. Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan or other land use plan?
a. Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State?
b. Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. The Project site is located within Mineral Resource Zone 3 (MRZ-3). 27 MRZ-3 is defined as an
area containing minerals of undetermined significance. The proposed Project is located in an area that is already occupied by Barton Road and urbanized uses. As such, if minerals are located within the Project boundary, they have already been loss due to previous development around the site and development of Barton Road. No mineral resource or mineral resource extraction or processing activity occurs on or adjacent to the Project site. Implementation of the proposed Project would not result in the loss of City or State-identified mineral resources. Therefore, no impacts associated with the loss of mineral resources would occur and no mitigation is required.
27 California Department of Conservation CGS Information Warehouse: Mineral Land Classification, https://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=mlc. Accessed October 6, 2020.
7.c
Packet Pg. 459 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 66 3.13 NOISE
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Result in generation of a substantial
temporary or permanent increase in
ambient noise levels in the vicinity of the
project in excess of standards established in
the local general plan or noise ordinance, or
applicable standards of other agencies?
b. Result in generation of excessive
groundborne vibration or groundborne
noise levels?
c. For a project located within the vicinity of a
private airstrip, or an airport land use plan
or where such a plan has not been adopted,
within two miles of a public airport or public
use airport, would the project expose
people residing or working in the project
area to excessive noise levels?
The analysis in this section is based on the Barton Road Bridge Removal and Road Construction Project Technical Noise Memorandum that was prepared for the proposed Project in June 2020 (Appendix F: Noise Memorandum).
a. Result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less than Significant Impact. Two types of short-term noise could occur during construction of the proposed Project. First, construction crew commutes and the transport of construction equipment and materials to the site would incrementally increase noise levels on roadways in the Project area. There would be a relatively high single-event noise exposure potential causing intermittent noise nuisance (passing trucks at 50 feet would generate up to a maximum of 84 A-weighted decibels [dBA]). The effect on longer-term (hourly or daily) ambient noise levels would be small because the hourly/daily construction-related vehicle trips are small when compared to existing hourly/daily traffic volume on Barton Road. The grading and excavation phase of the Project would generate the most trips of all the construction phases (i.e., 84 vehicles per hour or 171 vehicles per day). Barton Road would be used to access the Project site. The existing hourly/daily traffic volumes on Barton Road are estimated to be 596 vehicles per hour or 7,292 vehicles per day. Construction-related traffic would increase traffic noise levels on nearby roads by up to 0.6 dBA. A noise level increase of less than 3 dBA would not be perceptible to the human ear in an outdoor environment.
Therefore, there would be no incremental increase in ambient noise from construction-related vehicle trips, and short-term, construction-related impacts associated with worker commutes and equipment transport to the Project site would be less than significant and no mitigation is required.
7.c
Packet Pg. 460 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 67 The second type of short-term noise is related to noise generated during excavation, grading, and building erection on the Project site. Construction is completed in discrete steps, each of which has its own mix of equipment and, consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on the site and, therefore, the noise levels surrounding the site as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction-related noise ranges to be categorized by work phase. Table 3.13.A: Typical Maximum Construction Equipment Noise Levels (Lmax) lists typical construction equipment noise levels recommended for noise impact assessments, based on a distance of 50 feet between the equipment and a noise receptor, taken from the 2006 FHWA Roadway Construction Noise Model.28
Typical noise levels at 50 feet from an active construction area range up to 88 dBA Lmax (maximum instantaneous sound level) at 50 feet during the noisiest construction phases. The site preparation phase, which includes excavation and grading of the site, tends to generate the highest noise levels because the noisiest construction equipment is earthmoving equipment. Earthmoving equipment includes excavating machinery such as backfillers, bulldozers, draglines, and front loaders. Earthmoving and compacting equipment includes compactors, scrapers, and graders.
Project construction is expected to require the use of a scrapers, bulldozers, and water trucks/pickup trucks. Noise associated with the use of construction equipment is estimated to be between 55 and 85 dBA Lmax at a distance of 50 feet from the active construction area for the site preparation phase. As detailed in Table 3.13.A, the maximum noise level generated by each scraper is assumed to be approximately 85 dBA Lmax at 50 feet. Each bulldozer would generate approximately 85 dBA Lmax at 50 feet. The maximum noise level generated by water trucks/pickup trucks is approximately 55 dBA Lmax at 50 feet.
Each doubling of the sound sources with equal strength increases the noise level by 3 dBA. Assuming that each piece of construction equipment operates at some distance from the other equipment, the worstcase combined noise level during this phase of construction would be 88 dBA Lmax at a distance of 50 feet from the active construction area. The closest residences to the project construction boundary are 90 feet from the project construction boundary and would be exposed to construction noise levels of 83 dBA Lmax after distance attenuation. In addition, noise generated from the construction activities would stop once project construction is completed. Implementation of measures that include compliance with the construction hours specified by the City of Grand Terrace (the City of Colton does not have noise compliance times in their Municipal Code) prohibiting construction activity between the hours of 8:00 p.m. and 8:00 a.m. would reduce construction noise that could affect nearby residences. Additionally, the proposed Project will implement Caltrans Standard Specifications, Section 14-8.02 (as a condition of approval) which specifies that noise levels from the construction contractor’s operations, between the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86 dBA Lmax at a distance of 50 feet. Therefore, no construction noise impacts would occur with the implementation of measures described above. Shortterm noise impacts would be less than significant and no mitigation is required.
28 Roadway Construction Noise Model. Federal Highway Administration HEP-06-015. DOT-VNTSC-FHWA-06-02. NTIS No.
PB2006-109012. Highway Construction Noise Handbook. August 2006. https://www.fhwa.dot.gov/Environment/noise/ construction_noise/rcnm/index.cfm (accessed July 26, 2019) (FHWA, 2006).
7.c
Packet Pg. 461 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 68 Table 3.13.A: Typical Maximum Construction Equipment Noise Levels (Lmax) Type of Equipment Acoustical Usage Factor (percent)1 Maximum Noise Level (Lmax) at 50 feet 2 Backhoe 40 80
Compactor (ground) 20 80
Compressor 40 80
Crane 16 85
Dozer 40 85
Dump Truck 40 84
Excavator 40 85
Flatbed Truck 40 84
Forklift 40 85
Front-End Loader 40 80
Grader 40 85
Impact Pile Driver 20 95
Jackhammer 20 85
Pavement Scarifier 20 85
Paver 50 85
Pickup Truck 40 55
Pneumatic Tools 50 85
Pump 50 77
Rock Drill 20 85
Roller 20 85
Scraper 40 85
Tractor 40 84
Welder 40 73
Source: Barton Road Bridge Removal and Road Construction Project Technical Noise Memorandum, June 2020, Table A: Typical Construction Equipment Noise Levels, pg. 6.
Note: The noise levels reported in this table are rounded to the nearest whole number. 1 The usage factor is the percentage of time during a construction noise operation that a piece of construction equipment is operating at full power. 2 The maximum noise levels were developed based on Specification 721.560 from the Central Artery/Tunnel program to be consistent with the City of Boston, Massachusetts, Noise Code for the “Big Dig” project. Lmax = maximum instantaneous noise level Long-Term Stationary Noise. The proposed Project includes removal of a bridge on Barton Road spanning over the abandoned UPRR corridor. Once removed, the bridge will be replaced by fill and a new portion of Barton Road will be laid. Sidewalks and Class II bicycle lanes will also be constructed as part of the Project to promote pedestrian/bicyclist connection along Barton Road. The proposed Project will not include design features that would generate stationary noise.
Adjacent off‐site land uses would be potentially exposed to stationary‐source noise impacts from the proposed on‐site container and chassis drop‐off and pick‐up activities, forklift operations, heating, ventilation, and air conditioning equipment, and parking lot activities. Therefore, no long-term stationary noise reduction measures are required. No impacts from long-term stationary noise sources would occur and no mitigation is required.
Long-Term Off-Site Traffic Noise Impacts. The proposed Project includes removal of a bridge on Barton Road spanning over the abandoned UPRR corridor. Once removed, the bridge will be replaced by fill and
7.c
Packet Pg. 462 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 69 a new portion of Barton Road will be laid. Sidewalks and Class II bicycle lanes will also be constructed as part of the Project to promote pedestrian/bicyclist connection along Barton Road. The proposed Project, once completed, will not generate an increase in average daily traffic (ADT) volumes along Barton Road or other surrounding roads beyond what occurs under existing conditions. Under 23 Code of Federal Regulations (CFR) 772.5, this Project is not considered a Type I Project. A Type I Project is defined as follows:
• The construction of a highway on new location or the physical alteration of an existing highway where there is either:
o Substantial Horizontal Alteration. A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition; or, o Substantial Vertical Alteration. A project that removes shielding therefore exposing the line-ofsight between the receptor and the traffic noise source. This is done by either altering the vertical alignment of the highway or by altering the topography between the highway traffic noise source and the receptor; or,
o The addition of a through-traffic lane(s). This includes the addition of a through-traffic lane that functions as an High-Occupancy Vehicle lane, High-Occupancy Toll lane, bus lane, or truck climbing lane; or,
o The addition of an auxiliary lane, except for when the auxiliary lane is a turn lane; or, o The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial interchange; or,
o Restriping existing pavement for the purpose of adding a through-traffic lane or an auxiliary lane; or,
o The addition of a new or substantial alteration of a weigh station, rest stop, ride-share lot or toll plaza; or,
o If a project is determined to be a Type I project under this definition then the entire project area as defined in the environmental document is a Type I project.
Based on the details described above, implementation of the proposed Project would not increase vehicle volume on local roadways. Therefore, no impacts will occur pertaining to project‐related traffic noise impacts on off‐site sensitive receptors would occur. No mitigation measures are required. b. Result in generation of excessive groundborne vibration or groundborne noise levels? Less than Significant Impact. The vibration damage potential threshold criteria for old buildings, older residential structures, and modern industrial buildings is 0.25 peak particle velocity (PPV) (inches per second [in/sec]), 0.3 PPV (in/sec), 0.5 PPV (in/sec), respectively. In addition, the vibration annoyance potential criteria for continuous/frequent intermittent sources from the same manual. The vibration annoyance potential criteria are: barely perceptible at 0.01 PPV (in/sec), distinctly perceptible at 0.04 PPV (in/sec), strongly perceptible at 0.1 PPV (in/sec), and severe at 0.4 PPV (in/sec). Project construction is expected to use a large bulldozer and loaded truck, which would generate ground-borne vibration levels of 0.089 PPV (in/sec) and 0.076 PPV (in/sec), respectively, when measured at 25 feet. Vibration intensive construction equipment such as pile drivers, jackhammers, or vibratory rollers will not be used during Project construction.
7.c
Packet Pg. 463 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 70 The distance to the nearest buildings for vibration impact analysis is measured between the nearest off‐ site buildings and the Project boundary (assuming the construction equipment would be used at or near the Project boundary) because vibration impacts normally occur within the buildings. Table 3.13.B:
Vibration Source Amplitudes for Construction Equipment shows the PPV and vibration velocity decibels (VdB) values at a distance of 25 feet from the construction vibration source. As shown in Table 3.13.B, bulldozers and loaded trucks would generate a groundborne vibration level of 87 and 86 VdB, respectively, when measured at a distance of 25 feet, based on the Transit Noise and Vibration Impact Assessment Manual.
Table 3.13.B: Vibration Source Amplitudes for Construction Equipment Equipment
Reference PPV at 25 Feet (inches/second)
Vibratory Roller 0.210
Large Bulldozer2 0.089
Caisson Drilling 0.089
Loaded Trucks2 0.076
Jackhammer 0.035
Small Bulldozer 0.003
Crack-and-seat operations 2.4
Source: Barton Road Bridge Removal and Road Construction Project Technical Noise Memorandum, June 2020, Table D: Vibration Source Amplitudes for Construction Equipment, pg. 8.
Note: Equipment and associated source vibration levels that are expected to be used on the Project site are shown in bold. PPV = peak particle velocity
Table 3.13.C: Summary of Construction Vibration Levels lists the projected vibration level from various construction equipment expected to be used on the Project site to the nearest buildings in the Project vicinity. For typical construction activity, the equipment with the highest vibration generation potential is the large bulldozer, which would generate 87 VdB at 25 feet. The closest residential building to the south is approximately 100 feet from the project construction boundary. As shown in Table 3.13.C, the closest single‐family residence at 90 feet from the project construction boundary would experience vibration levels of up to 69 VdB (0.011 PPV in/sec). All other residences are farther than 100 feet from the project construction boundary and would experience lower vibration levels.
The nearest industrial building, residential building is located 15 feet, 90 feet, and 25 feet, respectively, from the Project site and would experience vibration levels of up to 0.191 PPV (inches/second), 0.013 PPV (inches/second), and 0.089 PPV (inches/second), respectively. Other industrial buildings in the Project area are farther away and would experience lower vibration levels that would not exceed community annoyance threshold and damage threshold. These vibration levels would range from barely perceptible to strongly perceptible, which may result in community annoyance. However, these vibration levels would not exceed the damage potential threshold criteria for old buildings, old residential structures, and modern industrial buildings at 0.25 PPV (inches/second), 0.3 PPV (inches/second), and 0.5 PPV (inches/second), respectively. Therefore, impacts pertaining to construction vibration would be less than significant and no vibration mitigation measures are required.
Long-Term Operational Vibration. Once developed, the Project would not generate vibration. No impact would occur and no mitigation measures are required.
7.c
Packet Pg. 464 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 71 Table 3.13.C: Vibration Source Amplitudes for Construction Equipment Land Use Direction
Equipment/
Activity
Reference Vibration
Level (PPV) at 25 feet
Distance to
Building (feet)
Vibration
Level (PPV)
Industrial (21700
Barton Road) North
Large
bulldozers 0.089 15 0.191
Loaded trucks 0.076 15 0.164
Industrial (21800
Barton Road) North
Large
bulldozers 0.089 35 0.054
Loaded trucks 0.076 35 0.046
Residential Northeast
Large
bulldozers 0.089 90 0.013
Loaded trucks 0.076 90 0.011
Industrial South
Large
bulldozers 0.089 25 0.089
Loaded trucks 0.076 25 0.076
Old Industrial
Structure South
Large
bulldozers 0.089 25 0.089
Loaded trucks 0.076 25 0.076
Source: Barton Road Bridge Removal and Road Construction Project Technical Noise Memorandum, June 2020, Table E: Summary of Construction Equipment and Activity Vibration, pg. 9.
Notes: The vibration damage potential threshold criteria for old buildings, old residential structures, and modern industrial building is 0.25 PPV (in/sec), 0.3 PPV (in/sec), and 0.5 PPV (in/sec), respectively. PPV = peak particle velocity. c. For a project located within the vicinity of a private airstrip or an airport land use plan or where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project are to excessive noise levels? No Impact. There are no private airstrips located within the vicinity of the Project site. The Project is beyond the 65 dBA Community Noise Equivalent Level impact zone from San Bernardino International Airport based on the Airport Layout Plan Narrative Report for San Bernardino International Airport, 29 and
beyond the 55 dBA Community Noise Equivalent Level noise contour of both Flabob Airport and Riverside Municipal Airport based on the Riverside County Airport Land Use Compatibility Plan. 30 Therefore, the
Project would not expose people residing or working in the project area to excessive noise levels and no impact would occur. No mitigation is required.
29 San Bernardino International Airport Authority. 2010. Airport Layout Plan Narrative Report for San Bernardino International Airport. September 22. 30 Riverside County Airport Land Use Commission. Riverside Municipal Airport; Riverside County Airport Land Use Compatibility Plan, Volume 20 Policy Document. March 2005.
7.c
Packet Pg. 465 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 72 3.14 POPULATION AND HOUSING
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)?
b. Displace substantial amounts of people or
housing, necessitating the construction of
replacement housing elsewhere?
a. Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
No Impact. The proposed Project is a transportation improvement that will include the removal of the Barton Road Bridge over the abandoned UPRR corridor straddling the City of Colton and City of Grand Terrace boundary line. Fill and a new portion of Barton Road will be developed to replace the removed bridge. Additionally, sidewalks and Class II bicycle lanes will be added for pedestrian and bicyclist connectivity as part of the Project. The Project will employ construction workers during construction of the site; however, these positions would likely be filled by individuals local to the area. The Project also does not include any significant infrastructure improvements or the significant extension of roads (as Barton Road already exists) that could indirectly induce growth in either City. Therefore, the proposed Project will not directly or indirectly cause population growth. No impact would occur and no mitigation is required.
b. Displace substantial amounts of people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. The proposed Project will be implemented on Barton Road. A sliver portion of parcel 0275- 223-16-0000 (located in Grand Terrace) will be acquired by the proposed Project. This parcel is zoned as Restricted Manufacturing and is not occupied by housing. As such, implementation of the proposed Project would not displace substantial amounts of people or housing, necessitating the construction of replacement housing elsewhere. Therefore, no impact would occur and no mitigation is required.
7.c
Packet Pg. 466 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 73 3.15 PUBLIC SERVICES
Would the project result in substantial adverse
physical impacts associated with the provision of
new or physically altered governmental facilities,
need for new or physically altered governmental
facilities, the construction of which could cause
significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for any of the public
services:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?
Fire Protection
Less than Significant Impact. The City of Colton Fire Department provides fire suppression and emergency medical services to the City. Fire Station 213 located approximately 1.28 miles to the north at 1100 South La Cadena Drive is the nearest Colton Fire Station that will serve the Project site. Station 213 is staffed by a captain, engineer, and firefighter/paramedic and is the Heavy Rescue Unit headquarters. The station is equipped with one fire engine.31
The City of Grand Terrace is within the service area of the San Bernardino County Fire Department for fire and rescue services.32 Fire Station 23 is located at 22582 City Center Court in Grand Terrace and is approximately 1 mile east of the Project site.
San Bernardino County Fire Station 23 and Colton Fire Department Station 213 is within an estimated three-minute travel time to the Project site. Through compliance with California Vehicle Code 21806(A)(1), which requires all vehicles to yield to emergency vehicles, travel time between the nearest fire station and the Project site is expected to remain approximately three minutes. The National Fire Protection Association maintains a four-minute response time standard for first responders, 90 percent of the time, and the Project site’s proximity to San Bernardino County Fire Station 23 and Colton Fire Department Station 213 would not preclude the Grand Terrace Fire Department’s or City of Colton Fire Department’s ability to meet the National Fire Protection Association standard. Additionally, both cities maintain mutual aid agreements with surrounding cities, which allow for the services of nearby fire departments to assist both cities during major emergencies. Therefore, the Project would not conflict with the City’s response time standard.
During construction, Barton Road will be closed to traffic between Terrace Avenue and Grand Terrace Avenue during the duration of construction activities. As a condition of approval, the construction contractor retained by the Project proponent will be required to develop a road closure detour plan
31 City of Colton, City of Colton General Plan Update Environmental Impact Report, 4.14 Public Services, May 2013, pg. 4.14-
1. 32 Fire. City of Grand Terrace. https://www.grandterrace-ca.gov/departments/fire (accessed October 7, 2020).
7.c
Packet Pg. 467 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 74 (detour plan) to enable motorists to travel safely around the closed portion of Barton Road and to allow fire department and emergency service access to the Project area. The proposed detour will route traffic around the construction zone on Barton Road via S. Terrace Avenue, De Berry Street, and S. La Crosse Avenue. The detour plan will be provided to the Colton Fire Department and San Bernardino Fire Department in order for them to plan emergency routes to the Project site and surrounding uses in the event of an emergency. Once the Project is completed, fire department service would not increase as the Project is not growth inducing. Because of the variety and proximity of existing fire protection services, no new or expanded fire stations are required to service the Project site during construction and operational activities. A less than significant impact would occur and no mitigation is required.
Police Protection
Less than Significant Impact. The City of Colton Police Department will serve the Project site. The Police Department headquarters is in the City’s civic center located at 650 North La Cadena Drive, approximately 3 miles north of the Project site.33 The City of Grand Terrace contracts with the San Bernardino County Sheriff-Coroner Department.
34 The Project site is located two miles to the northwest of the City crime prevention headquarters, with an estimated three-minute travel time to the Project site.
Similar to fire protection services, the Project site is already within the service area of the Colton Police Department and San Bernardino County Sheriff and would continue to be served by both departments upon Project implementation. Compliance with California Vehicle Code 21806(A)(1), which requires all vehicles to yield to emergency vehicles, would ensure response times to the Project site are not significantly altered.
As a condition of approval, the construction contractor retained by the Project proponent will be required to develop a road closure detour plan (detour plan) to enable continuous access to the site and surrounding uses during Project construction. This detour plan will be shared with the Colton Police Department and San Bernardino County Sheriff’s Department to ensure that both can plan proper routing to the Project area during associated road closures. Any construction equipment left at staging areas will be properly secured to reduce vandalism or theft during construction activities. This will reduce calls to service to the Project site from the Colton Police Department and San Bernardino County Sherriff’s Department during the construction period. Once completed, calls for service to the site from local law enforcement is anticipated to be the same as under existing conditions. Since the proposed Project would not generate a substantial increase in population, any incremental increase in demand for police services would not create the need for new or altered police facilities. Therefore, impacts would be less than significant and no mitigation is required.
Schools
No Impact. While the Project site is located within the Colton Joint Unified School District, because the Project does not include a residential component, no direct increase in the local student population would occur. Employment opportunities resulting from the construction of the proposed Projectislikely to be filled by existing local residents; therefore, no significant indirect increase in the local student population would occur and there would be no impact on schools. No mitigation is required.
33 City of Colton, City of Colton General Plan Update Environmental Impact Report, 4.14 Public Services, May 2013, pg. 4.14-2. 34 Police Services. City of Grand Terrace. https://www.grandterrace-ca.gov/departments/police_services (accessed October 7, 2020).
7.c
Packet Pg. 468 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 75 Parks/Recreational Facilities
Less than Significant Impact. Refer to responses to Checklist Questions 3.16a and 3.16b. Impacts would be less than significant and no mitigation is required.
Other Public Facilities
No Impact. The Project does not include a residential component and any employment opportunities resulting from the construction of the proposed Project are likely to be filled by existing local residents; therefore, no significant direct or indirect increase in the City’s population is anticipated.
In the absence of any increase in population, the construction of new or expansion of existing governmental facilities is not required. No impact to other public facilities would occur and no mitigation is required.
7.c
Packet Pg. 469 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 76 3.16 RECREATION
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Increase the use of existing neighborhood
and regional parks or other recreational
facilities such that substantial physical
deterioration of the facility would occur or
be accelerated?
b. Include recreational facilities or require the
construction or expansion of recreational
facilities that might have an adverse
physical effect on the environment?
a. Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b. Include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment? Less than Significant Impact. In the absence of any direct or significant increase in population, no increase in demand for park/recreation facilities would occur; therefore, no expansion of existing or development of new park/recreation areas would occur. While the Santa Ana River Trail is located just north of the Project site, the Project would not impede any City policy or plan to maintain access or connectivity of the trail system. The proposed Project would complete new sidewalk and Class II bike lane connectivity along Barton Road which would promote easier access to the Santa Ana River Trail north of the site via South La Cadena Drive. Therefore, the proposed Project would have less than significant impacts related to the increased use of public parks and recreation facilities or construction or expansion of park or recreation facilities. No mitigation is required.
7.c
Packet Pg. 470 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 77 3.17 TRANSPORTATION
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Conflict with a program, plan, ordinance, or
policy addressing the circulation system,
including transit, roadway, bicycle, and
pedestrian facilities?
b. Would the project conflict or be
inconsistent with CEQA Guidelines Section
15064.3, subdivision (b)?
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp curves
or dangerous intersections) or incompatible
uses (e.g., farm equipment)?
d. Result in inadequate emergency access?
The analysis in this section is based on the Traffic Study Report: Barton Road Bridge Removal and Road Construction Project that was prepared for the proposed Project in February 2020 (Appendix G: Traffic Study Report).
a. Conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities?
Less than Significant Impact. Both the City of Colton and the City of Grand Terrace General Plans identify intersection thresholds of significance. These thresholds use level of service (LOS), a ratio of traffic volume to roadway capacity. Levels of service are defined using the letter grades A through F, in which LOS A35 represents the least amount of traffic congestion and LOS F36 the most. Both cities use LOS D as the minimum level of service criteria for intersections. Any intersection operating at LOS E or F is considered to be unacceptable.
A Project-specific Traffic Study Report (TSR) (Appendix G) was prepared to assess potential circulation impacts associated with the proposed Project. The TSR was conducted to conform to analysis standards and parameters established by the City of Colton. The City of Colton guidelines prescribe the use of the Highway Capacity Manual methodology in determining the level of service for signalized intersections.
The TSR summarized the analysis for the existing year 2019, 2023, and 2045 design year under two conditions, including: (1) Existing, (2) Opening Year, and (3) Buildout Year).
35 LOS A is defined as a delay per vehicle of ≤ 10 seconds for unsignalized intersection and ≤ 10 seconds for signalized intersection. 36 LOS F is defined as a delay per vehicle of > 50 seconds for unsignalized intersection and > 80 seconds for signalized intersection.
7.c
Packet Pg. 471 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 78 Streets in the site vicinity that will be affected by the proposed Project include La Cadena Drive, Terrace Avenue, Grand Terrace Road, and Barton Road. The following provides a summarization of the existing conditions of the roads in the vicinity of the Project site:
La Cadena Drive. La Cadena Drive is a north-south, four-lane roadway divided by a raised median. The posted speed limit in the study area is 50 mph. La Cadena Drive is the only Divided Major Highway in the City of Grand Terrace and runs along the boundary of the two cities. A Divided Major Highway, such as La Cadena Drive, consists of a 120-foot right-of-way with a divided 64-foot improved section and a raised median. La Cadena Drive connects the City of Grand Terrace to the City of Colton to the north and connects to the City of Riverside to the south. According to the Land Use Plans of the Cities of Colton and Grand Terrace, the land uses along La Cadena Drive are light industrial and industrial park zones, respectively.
Terrace Avenue. Terrace Avenue is a north-south, two-lane roadway. It is classified as a Local Street in the Cities of Colton and Grand Terrace. The speed limit for this road in the Project area is 25 mph. Terrace Avenue is divided into two street segments by Barton Road where the north segment extends along the boundary of City of Grand Terrace and City of Colton, and the south segment continues into the City of Colton. This street provides direct access to residential neighborhoods. With a 60-foot right-of-way and a 36-foot improved section, local streets have direct residential lots fronting onto them and are the standard street category within residential neighborhoods. According to both City of Colton and City of Grand Terrace Land Use Plans, the land uses in the vicinity of the Project along Terrace Avenue are light industrial and industrial park zones, respectively.
Grand Terrace Road. Grand Terrace Road is a north-south, two-lane roadway. It is located approximately 550 feet east of the Project site. The posted speed limit of the road in the study area is 25 mph. Grand Terrace Road is one of the collector streets in the City of Grand Terrace and extends partially into the City of Colton and along the boundaries of the two cities. With a 66-foot right-of-way and a 44-foot improved section, this category of roadway connects local traffic with residential neighborhoods and the arterial highway network. According to the Land Use Plans of the two cities, the land uses along Grand Terrace Road are medium density residential and industrial zones.
Barton Road. Barton Road is an east-west, four-lane roadway. The posted speed limit is 40 mph. This is one of the major highways in the City of Grand Terrace and it provides service to non-local commuters along Interstate 215 (I-215) as well as local access to the public. Major highways have a 100-foot right-ofway with a 72-foot improved section. The roadway classification is characterized with four travel lanes, minimal curb cuts, and signalized intersections. Barton Road also provides direct access to the regional freeway I-215 and commercial corridors; it runs through the City of Grand Terrace. Barton Road continues into the City of Colton with most of its land uses designated as general commercial, industrial, and lowdensity residential zones. Barton Road between South La Cadena Drive and Grand Terrace Road has a 2019 average daily traffic (ADT) volume of 7,292 vehicles.
The study area for the TSR encompasses the above identified road segments and four intersections in the Project vicinity. The intersections include: La Cadena Drive and Barton Road; North Leg of Terrace Avenue and Barton Road; South Leg of Terrace Avenue and Barton Road; and Grand Terrace Road and Barton Road. The four intersections, as of 2019, operated at LOS B or LOS C conditions during AM and PM Peak Hours. Table 3.17.A: Opening Year (2023) and Horizon Year (2045) Intersection LOS summarizes the delay time and LOS under each of these conditions at the four study intersections.
7.c
Packet Pg. 472 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 79 As shown in Table 3.17.A, the Barton Road/South Leg Terrace Road intersection will operate at unacceptable LOS F conditions during the PM peak hours in the Horizon Year (2045) and the Barton Road/La Cadena Drive intersection will operate at unacceptable LOS F conditions during the AM peak hours in the Horizon Year (2045). This is due to the anticipated build-out of the Cities of Colton and Grand Terrace and is not directly caused by the proposed Project.
Table 3.17.A: Opening Year (2023) and Horizon Year (2045) Intersection LOS Intersection Peak Hour Control
2023 2045
Delay LOS Delay LOS
Barton Road at La Cadena Drive
AM
Signal
52.3 D 52.3 F
PM 33.3 C 33.3 C
Barton Road at North Leg Terrace Road
AM
TWSC
15.1 C 21.7 C
PM 15.0 C 25.9 D
Barton Road at South Leg Terrace Road
AM
TWSC
16.2 C 25.9 D
PM 28.0 D 131.6 F
Barton Road at Grand Terrace Road
AM
Signal
26.9 C 59.9 E
PM 19.8 B 26.0 C
Source: Table 11: City of Colton and City of Grand Terrace Traffic Study Report: Barton Road Bridge Removal and Road Construction Project Table 11: Opening Year and Horizon Year Traffic Segment ADT, pg. 16, February 2020.
Notes: TWSC = Two-way stop-controlled. Bolded LOS = Unacceptable LOS Barton Road, during Project construction, will be closed, requiring a detour to be implemented. The detour is anticipated to generate some delays in the traffic flow around the proposed Project. The detour will route traffic around the construction zone on Barton Road via S. Terrace Avenue, De Berry Street, and S. La Crosse Avenue. Analysis presented in the TSR determined this detour would not generate major queuing spill back on La Cadena Drive or at Grand Terrace Boulevard. The delay is not significantly higher and both of these intersections will continue to operate at acceptable LOS during Project construction.
The closure of Barton Road during Project construction will, therefore, not contribute to substantial degradation of intersection LOS.
The proposed Project will include new sidewalks and a Class II bicycle lane along Barton Road in the area where the Barton Road Bridge over the UPRR corridor will be removed. These additions associated with the proposed Project will result in a benefit to the Cities of Colton and Grand Terrace bicycle and pedestrian facilities by creating better connectivity for these alternative modes of transportation.
Implementation of the proposed Project will not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities. Impacts will be less than significant and no mitigation measures are required. b. Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)? No Impact. CEQA Guidelines Section 15064.3, subdivision (b) establishes “vehicle miles traveled” (VMT) criteria in lieu of LOS for analyzing transportation impacts and was signed into law as Senate Bill (SB) 743 in 2013. Regulatory changes to the CEQA Guidelines that implement SB 743 were approved by the Office of Planning and Research on December 28, 2018. However, lead agencies had until July 1, 2020, which is the statewide implementation date, to opt-in use of the new VMT metric. In cases where lead agencies use LOS for analyzing transportation impacts, they may continue to do so until July 1, 2020.
7.c
Packet Pg. 473 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 80 In June 2020, the City of Colton published TO#234 City of Colton VMT (Vehicle Miles Traveled) Guidelines for the City of Colton, California which provides the City of Colton VMT methodology for various projects by analyzing the VMT per capita, employee, and/or per service population. In concurrence with the California Office of Planning and Research Guidelines, transportation projects in the City of Colton that will not significantly impact the amount of vehicle travel can be excluded from VMT analysis.37 The proposed Project includes removal of the Barton Road Bridge over the UPRR corridor, replacing the bridge with fill and a new roadbed to connect to Barton Road, new sidewalks, and new Class II bicycle lanes. The Project will not generate more vehicle volume above the existing volume along Barton Road nor will it generate more vehicle miles traveled compared to existing conditions. The proposed Project will therefore not conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b). No impact will occur and no mitigation measures are required.
c. Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less than Significant Impact. The proposed Project is being implemented as the Barton Road Bridge was originally built in 1936 over the UPRR corridor and is now structurally unsound and does not provide adequate, safe, pedestrian or bicycle access along Barton Road. The design of the existing Barton Road Bridge does not account for seismic loading, which is required for public safety in California due to the high seismic activity in the state. If the proposed Project is not implemented, it would continue to present a hazard to the public (motorists, pedestrians, bicyclists) traveling along Barton Road between South Terrace Avenue and Grand Terrace Road. The proposed Project would remove the structurally unsound bridge and replace it with fill and road that would replenish the Barton Road connection where the bridge used to be located. The proposed Project will also implement sidewalks and a Class II bicycle lane designed to City of Colton and City of Grand Terrace standards. This design feature will improve safe travel for pedestrians and bicyclists along Barton Road between South Terrace Avenue and Grand Terrace Road.
Overall, the proposed Project would not substantially increase hazards due to a geometric design feature, but would actually improve the overall safety of Barton Road for pedestrians, motorists, and bicyclists between South Terrace Avenue and Grand Terrace Road. Impacts will be less than significant. No mitigation is required.
d. Result in inadequate emergency access?
Less than Significant Impact. Roadway facilities with regional access typically serve as evacuation routes in the event of an emergency. The City of Grand Terrace General Plan Public Health38 and Safety Element and the City of Colton General Plan Safety Element39 identifies Barton Road and La Cadena Avenue as major evacuation routes. Specific evacuation routes depend upon the type of emergency and its location, but La Cadena Avenue are within 1,000 feet of the proposed Project and the proposed Project is on Barton Road.
During construction of the proposed Project, Barton Road will be temporarily closed between Terrace Avenue and Grand Terrace Avenue. As a condition of approval for the Project, a detour plan will be prepared and distributed to emergency service, fire department, and police department staff that provides service to the Project site and surrounding uses. As part of the detour plan, signs will be installed
37 City of Colton, City of Colton Vehicle Miles Traveled (VMT) Guidelines, Section 2.4 Transportation Projects, page 27. Website:
https://www.ci.colton.ca.us/AgendaCenter/ViewFile/Item/2599?fileID=3138. Accessed October 12, 2020. 38 City of Grand Terrace General Plan –Page V-14. 39 City of Colton General Plan Safety Element, Figure S-11: Evacuation Routes, page S-26, 2018.
7.c
Packet Pg. 474 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 81 along nearby roads to inform motorists that Barton Road is closed and it is necessary to take the detours.
Once the proposed Project is complete, Barton Road between Terrace Avenue and Grand Terrace Avenue and vehicle flow conditions will be restored back to near existing conditions. Based on the above discussion, implementation of the proposed Project would not result in inadequate emergency access.
Impacts would be less than significant and no mitigation measures are required.
7.c
Packet Pg. 475 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 82 3.18 TRIBAL CULTURAL RESOURCES
Would the project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code Section
21074 as either a site, feature, place, cultural
landscape that is geographically defined in terms of
the size and scope of the landscape, sacred place, or
object with cultural value to a California Native
American tribe, and that is:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code Section 5020.1(k)?
b. A resource determined by the lead agency,
in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in subdivision
(c) of Public Resources Code Section 5024.1.
In applying the criteria set forth in
subdivision (c) of Public Resource Code
Section 5024.1, the lead agency shall
consider the significance of the resource to
a California Native American tribe?
a. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k)? The Historic Property Survey Report prepared for the proposed Project indicated that there have been 17 cultural resource studies previously conducted within one mile of the Project site, two of which included parts of the Project site. A linear cultural resource transects the Project site (36-006101, the historic period UPRR route) and 25 additional cultural resources have been documented within one mile of the Project site. The additional cultural resources include prehistoric (habitation site, rock shelters, milling features, and artifactscatters) and historic period (rock shelter) archaeological resources, along with historic period utilities, railroads, water conveyance systems, a residence, school, and bridge. The segment of UPRR route transecting the Project site was evaluated in 2009 as not eligible for the National Register either individually or as contributing segments to the overall alignment. The Barton Road Bridge is listed in the California Historical Significance Local Agency Bridge List as a Category 5 Bridge; however, it is not eligible for the National Register. With the exception of the Barton Road Bridge, none of the resources identified is listed in any of the registers, directories, or inventories. The nearest prehistoric resource (a habitation site and artifact scatter) was documented approximately 0.57 mile north of the proposed Project site.
Additional previous research indicated two additional built environment resources (21842 Grand Terrace Road and 21892 Grand Terrace Road); however, these two historic period residences were evaluated as not eligible for the National Register and concurred with by the State Historic Preservation Office in 2011.
Due to the minimal results of the records search and the survey conducted for the proposed Project, along with the average depth of road subgrades (3+ feet) and severe disturbance of urban road right-of-way, there is a small potential for intact subsurface cultural deposits being found during Project construction
7.c
Packet Pg. 476 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 83 activities. If previously unidentified cultural materials are unearthed during project construction, implementation of previously identified Mitigation Measure CUL-1 would reduce impacts to potential historic resources to a less than significant level.
b. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe? Chapter 532, Statutes of 2014 (i.e., AB 42), requires Lead Agencies evaluate a project’s potential impact to “tribal cultural resources.” Such resources include “[s]ites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American Tribe that are eligible for inclusion in the California Register of Historical Resources or included in a local register of historical resources.” AB 52 also gives Lead Agencies the discretion to determine, supported by substantial evidence, whether a resource qualifies as a “tribal cultural resource.”
Per AB 52 (specifically PRC 21080.3.1), Native American consultation is required upon request by a California Native American tribe that has previously requested that the City provide it with notice of such projects. Pursuant to provisions of AB 52, the City contacted (November 11, 2020) the following Native American groups:
• Agua Caliente Band of Cahuilla Indians;
• Augustine Band Cahuilla Band of Indians;
• Cabazon Band of Mission Indians;
• Cahuilla Band of Indians;
• Gabrieleño Band of Mission Indians – Kizh Nation;
• Gabrieleno/Tongva San Gabriel Band of Mission Indians; • Gabrielino/Tongva Nation;
• Gabrielino Tongva Indians of California Tribal Council; • Gabrielino-Tongva Tribe;
• Los Coyotes Band of Cahuilla and Cupeno Indians;
• Morongo Band of Mission Indians;
• Pala Band of Mission Indians;
• Pechanga Band of Luiseño Indians;
• Quechan Tribe of the Fort Yuma Reservation;
• Ramona Band of Cahuilla;
• Rincon Band of Luiseño Indians;
• San Manuel Band of Mission Indians;
• Santa Rosa Band of Cahuilla Indians;
• Serrano Nation of Mission Indians; and
7.c
Packet Pg. 477 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 84 • Soboba Band of Luiseño Indians.
The Augustine Band of Cahuilla Indians stated in their response (November 16, 2020), “At this time, we are unaware of specific cultural resources that may be affected by the proposed project.” The tribe requested to be notified in the event any cultural material is discovered during project construction.
The Cabazon Band of Mission Indians stated in their response (November 18, 2020), “There is no presence of Native American resources that may be impacted by your future project regarding the replacement of the existing two-lane bridge on Barton Road and road construction project in Colton, CA.” The San Manuel Band of Mission Indians (SMBMI) stated in their response (November 17, 2020), “The proposed project area exists within Serrano ancestral territory and, therefore, is of interest to the Tribe.
However, due to the disturbance, nature, and location of the proposed project, and given the CRM Department’s present state of knowledge, SMBMI does not have any concerns with the project’s implementation, as planned, at this time.”
No other Native American groups responded to the City’s invitation to consult on the project.
The SMBMI requested the following mitigation to address potential future impacts relative to Native American cultural resources:
Mitigation Measure TCR-1: In the event that cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of Interior standards shall be hired to assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period.
Additionally, the San Manuel Band of Mission Indians Cultural Resources Department (SMBMI) shall be contacted, as detailed within TCR-2, regarding any pre-contact and/or historic-era finds and be provided information after the archaeologist makes his/her initial assessment of the nature of the find, so as to provide Tribal input with regard to significance and treatment.
If significant pre-contact and/or historic-era cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to SMBMI for review and comment, as detailed within TCR-2. The archaeologist shall monitor the remainder of the project and implement the Plan accordingly.
If human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the Project.
Mitigation Measure TCR-2: The San Manuel Band of Mission Indians Cultural Resources Department (SMBMI) shall be contacted if any pre-contact and/or historic-era cultural resource(s) are discovered during project implementation and be provided information regarding the nature of the find, so as to provide Tribal input with regard to significance and treatment.
Should the find be deemed significant, as defined by CEQA (as amended, 2015), a cultural resources Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with SMBMI, and all subsequent finds shall be subject to this Plan. Should SMBMI elect to place a monitor on site,
7.c
Packet Pg. 478 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 85 this Plan shall allow for a monitor to be present that represents SMBMI for the remainder of the project.
Any and all archaeological/cultural documents created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to SMBMI. The Lead Agency and/or applicant shall, in good faith, consult with SMBMI throughout the life of the project.
Implementation of Mitigation Measures TCR-1 and TCR-2 would reduce impacts to tribal cultural resources to a less than significant level by ensuring appropriate notification, protection, and assessment of any tribal cultural material encountered during the course of project construction.
7.c
Packet Pg. 479 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 86 3.19 UTILITIES AND SERVICE SYSTEMS
Would the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Require or result in the relocation or
construction of new or expanded water,
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which would
cause significant environmental effects?
b. Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry, and multiple dry years?
c. Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it has
adequate capacity to serve the project’s
projected demand in addition to the
provider’s existing commitments?
d. Generate solid waste in excess of State or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals?
e. Comply with federal, State, and local
management reduction statutes and
regulations related to solid waste?
a. Require or result in the relocation or construction of new or expanded water, drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which would cause significant environmental effects?
Less than Significant Impact. The proposed Project will include the removal and reconstruction of the drainage outlet west of Grand Terrace Avenue, construction of a drainage culvert across Barton Road in the vicinity of the abandoned UPRR corridor, and the relocation of the Riverside Highland Water Company line, the City of Colton waterline, fiber optic cable, and a gas line in the existing bridge and roadway and relocation of overhead telephone lines along the north side of Barton Road. The City of Colton will coordinate directly with the utility providers to ensure relocation of facilities adequately occurs and no additional environmental affects above and beyond those analyzed in this document occurs.
The approval of drainage features/improvements occurs through the City’s plan check process. As part of this process, all project-related drainage features will be required to meet the City’s Public Works Department and Santa Ana RWQCB standards. On-site project-related drainage features will be designed,
7.c
Packet Pg. 480 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 87 installed, and maintained per Public Works Department standards and the requirements identified in the Final WQMP (per Mitigation Measure HYD-3) prepared for the Project.
There would be no significant environmental effects specifically related to the relocation of utility facilities that are not encompassed within the Project’s construction and operational footprint, and therefore already identified, disclosed, and subject to all applicable mitigation measures, as well as local, State, and federal regulations, as part of this Initial Study. Therefore, impacts related to relocation of utilities would be less than significant. No additional mitigation is required. b. Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years? Less than Significant Impact. The Project site is served by the RHWC. According to the SBVR 2015 UWMP, the RHWC relies on groundwater from five separate groundwater basins. The RHWC actual per capita water use per day in 2015 was 166 gallons.40 The proposed Project will require non-potable water during construction activities for dust suppression. The amount of water that will be required during the 14 month construction period will be minimal and will more than likely be trucked in and stored onsite or obtained through hooking up of nearby existing fire hydrants. Once the Project is complete, water use will not be required. Comparing historically low conditions to demand projections, the RHWC has adequate water supplies available to meet projected demands should a multiple-dry year period occur. Also, the RHWC has ample water supply to serve the Project during the 14-month construction period. Impacts would be less than significant and no mitigation is required. c. Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less than Significant Impact. The proposed Project includes removal of the Barton Road Bridge over the abandoned UPRR corridor, installation of fill and new roadbed in place of the bridge, new sidewalks and new Class II bicycle lanes, to provide safe connectivity between La Cadena and the Barton Road/I-215 interchange and efficient access between the Cities of Colton and Grand Terrace. During Project construction, portable restrooms will be set up for construction workers. The portable restrooms will be emptied as required and its contents will be transported to local wastewater facilities for treatment.
Construction of the proposed Project will minimally increase the amount of wastewater generated that will need to be treated at local facilities. Once complete, the proposed Project will not generate wastewater that will need to be treated at local facilities. The wastewater treatment provider will have adequate capacity to serve the Project during its construction period (14 months). Impacts will be less than significant and no mitigation measures are required. d. Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less than Significant Impact. Solid waste collection and disposal within the City are provided by Colton Disposal. There are a number of active landfills that currently serve the City of Colton; however, solid waste is first transported to the CR&R Inland Regional Material Recovery Facility located at 2059 E. Streel Road in Colton. The solid waste is sorted at this facility and non-recyclable waste is then transported to active landfills serving the City of Colton for appropriate disposal. The proposed Project will only generate
40 San Bernardino Valley Regional Urban Water Management Plan, 2016. Page 15-8.
7.c
Packet Pg. 481 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 88 solid waste (construction debris) during the 14-month construction period. The construction debris will be transported to the Inland Regional Material Recovery Facility where it will be sorted for recycling purposes (as applicable) and then transported to the appropriate landfill. The amount of construction debris that will be generated by the proposed Project is estimated to be minimal and will not be enough to exceed the capacity of local active landfills or transfer facilities. Therefore, impacts associated with excessive generation of solid waste would be less than significant. No mitigation is required. e. Comply with federal, State, and local management reduction statutes and regulations related to solid waste?
Less than Significant Impact. The City of Colton requires all projects to adhere to all source reduction programs set forth for the disposal of solid waste, including construction demolition materials. The City General Plan sets out goals and policies to provide for an efficient and environmentally sound solid waste collection, recycling, and disposal system. The proposed Project would adhere to all applicable local, State, and federal solid waste disposal standards. Therefore, impacts associated with solid waste disposal regulations would be less than significant. No mitigation is required.
7.c
Packet Pg. 482 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 89 3.20 WILDFIRE
If located in or near State responsibility areas or
lands classified as very high fire hazard severity
zones, would the project: Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Substantially impair an adopted emergency
response plan or emergency evacuation
plan?
b. Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to,
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
c. Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
result in temporary or ongoing impacts to
the environment?
d. Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
a. Substantially impair an adopted emergency response plan or emergency evacuation plan? Less than Significant Impact. The Project site is not located within or immediately adjacent to a State Responsibility Area or Local Responsibility Area (LRA) designated as a Very High Fire Hazard Severity Zone (VHFHSZ) by Cal Fire.41 The western boundary of the Project site is approximately 995 feet east of an LRA designated as a VHFHSZ. The Project does not include the construction or occupation of any structures or facilities within a wildland fire area.
During construction of the proposed Project, Barton Road will be temporarily closed between Terrace Avenue and Grand Terrace Avenue. As a condition of approval for the Project, a detour plan will be prepared and distributed to emergency service, fire department, and police department staff that provides service to the Project site and surrounding uses. As part of the detour plan, signs will be installed along nearby roads to inform motorists that Barton Road is closed and it is necessary to take the detours.
Once the proposed Project is complete, Barton Road between Terrace Avenue and Grand Terrace Avenue and vehicle flow conditions will be restored back to near existing conditions. Based on the above discussion, implementation of the proposed Project would not substantially impair an adopted emergency
41 California State Geoportal, FHSZ in LRA, Website: https://gis.data.ca.gov/datasets/CALFIRE-Forestry::fhsz-in-lra?geometry=- 117.349%2C34.031%2C117.309%2C34.038. Accessed on October 8, 2020.
7.c
Packet Pg. 483 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 90 plan or emergency evacuation plan. Impacts would be less than significant and no mitigation measures are required.
b. Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Less than Significant Impact. The Project site is currently occupied by Barton Road and the Barton Road Bridge spanning the abandoned UPRR corridor in an urban area straddling the Colton and Grand Terrace city boundary line. Small areas of vegetation exist on land within the site that is not occupied by urban uses. Some of these vegetated areas will be replaced by roadway features with implementation of the proposed Project. The Project site is relatively flat. The proposed Project would not exacerbate wildfire risks due to slope, prevailing winds, or other factors and would not expose the traveling public to pollutant concentrations from a wildfire or uncontrolled spread of a wildfire. Impacts would be less than significant and no mitigation is required.
c. Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may result in temporary or ongoing impacts to the environment?
Less than Significant Impact. The proposed Project will require the removal and reconstruction of the drainage outlet west of Grand Terrace Avenue and construction of a drainage culvert across Barton Road in the vicinity of the abandoned UPRR corridor. The Project will also require relocation of the Riverside Highland Water Company line, the City of Colton waterline, fiber optic cables, and a gas line in the existing bridge and roadway and relocation of overheard telephone lines along the north side of Barton Road. All of these relocation/reconstruction requirements will occur with oversight from owners of the facilities or from public works departments of Colton and Grand Terrace as applicable. These features associated with the proposed Project are not anticipated to result in temporary or ongoing impacts to the environment.
Impacts would be less than significant and no mitigation measures are required. d. Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Less than Significant Impact. The Project site is not located within or immediately adjacent to a State Responsibility Area or Local Responsibility Area (LRA) designated as a Very High Fire Hazard Severity Zone (VHFHSZ) by CAL FIRE.
42 The western boundary of the Project site is approximately 995 feet east of an LRA designated as a VHFHSZ.
The landscape up gradient of the Project site consists of developed land except within the abandoned UPRR corridor where development is absent. The proposed Project will include removal and reconstruction of the drainage outlet west of Grand Terrace Avenue and will also include construction of a drainage culvert across Barton Road in the vicinity of the abandoned UPRR corridor. These features of the Project will improve drainage in the area of the Project site once the proposed Project becomes operational. Since the Project site is located up gradient (upslope) of landscape features that could be subject to post-fire slope instability or drainage changes, the risk of flooding or landslides from wildfires
42 California State Geoportal, FHSZ in LRA, Website: https://gis.data.ca.gov/datasets/CALFIRE-Forestry::fhsz-in-lra?geometry=- 117.349%2C34.031%2C117.309%2C34.038. Accessed on October 8, 2020.
7.c
Packet Pg. 484 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 91 is minimal. Therefore, the risk of downslope or downstream flooding or landslides as a result of runoff, post-fire slope instability, or drainage changes is less than significant. No mitigation is required.
7.c
Packet Pg. 485 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 92 3.21 MANDATORY FINDINGS OF SIGNIFICANCE
Does the project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Have the potential to substantially degrade
the quality of the environment, substantially
reduce the habitat of a fish or wildlife
species, cause a fish or wildlife population
to drop below self-sustaining levels,
threaten to eliminate a plant or animal
community, substantially reduce the
number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods of
California history or prehistory?
b. Have impacts that are individually limited,
but cumulatively considerable?
(“Cumulatively considerable” means that
the incremental effects of a project are
considerable when viewed in connection
with the effects of past projects, the effects
of other current projects, and the effects of
probable future projects.)
c. Have environmental effects that will cause
substantial adverse effects on human
beings, either directly or indirectly?
a. Have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below selfsustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less than Significant with Mitigation Incorporated. The proposed Project’s impacts to biological resources and cultural resources were analyzed in this Initial Study, and all direct, indirect, and cumulative impacts were determined to have no impact, a less than significant impact, or reduced to a less than significant impact with implementation of mitigation. No endangered or threatened species were identified on the Project site. Development of the proposed Project would not cause fish or wildlife populations to drop below self-sustaining levels or restrict the movement/distribution of a rare or endangered species. The proposed Project would not affect any threatened or endangered species or associated habitat. Potential impacts to roosting bats in palm trees on the site and nesting birds would be mitigated to less than significant levels with implementation of Mitigation Measures BIO-1 and BIO-2.
Development of the proposed Project would not affect known historic, archaeological, or paleontological resources. There are no known unique or cultural values associated with the Project site, nor are known
7.c
Packet Pg. 486 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 93 religious or sacred uses associated with the Project site. In the event that undiscovered cultural or archaeological resources are uncovered during Project construction, implementation of Mitigation Measure CUL-1 would ensure impacts are reduced to a less than significant level. Additionally, the Project applicant is required to comply with CCR Section 15064.5(e), California Health and Safety Code Section 7050.5, and PRC Section 5097.98 as a matter of policy in the event human remains are encountered at any time. Furthermore, Mitigation Measures TCR-1 and TCR-2has been identified to address potential impacts if subsurface cultural resources pertaining to Native Americans would be encountered during construction. Implementation of the above identified mitigation measures as well as adherence to regulations governing human remains, would reduce potential impacts to cultural and paleontological resources to less than significant.
b. Have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.)
Less than Significant Impact. The proposed Project has either no impact, a less than significant impact, or a less than significant impact with mitigation incorporated with respect to all environmental issues pursuant to CEQA. Due to the limited scope of direct physical impacts to the environment associated with the proposed Project, the Project’s impacts are primarily project-specific in nature.
The proposed Project is listed in the 2016 financially constrained RTP/SCS Amendment No 2, which was found to conform by SCAG on July 6, 2017, and by the FTA/FHWA on August 1, 2017. On September 6, 2018, SCAG’s Regional Council adopted the 206 RTP/SCS Amendment No. 3 but conformity determination approval from the FHWA is pending. The proposed Project is listed in the 2017 Federal Transportation Improvement Program (FTIP) 17-00 under ID No. SDBSL08. The 2017 FTIP Consistency Amendment 17-18 was approved by SCAG on February 23, 2018, and by FTA/FHWA on March 26, 2018. The design concept and scope on the proposed Project is consistent with the Project description in the 2016 RTP and 2017 FTIP and the “open to traffic” assumptions of the SCAG’s regional emissions analysis.
The proposed Project would not exceed significance thresholds for air-quality impacts during short-term construction-related activities or for operation. As such, standard conditions and/or mitigation measures to reduce air quality impacts are not warranted. Construction and operational noise would not exceed City thresholds; therefore, no standard conditions or mitigation measures are warranted.
The analysis presented in this Initial Study takes into account cumulative effects the proposed Project would have in the Cities of Colton and Grand Terrace. Overall, all impacts described herein have been reduced to a level that is less than significant and the Project’s contribution to cumulative impacts would also be reduced with implementation of site-specific mitigation measures and conditions of approval identified in this document. The proposed Project would have a less than cumulatively considerable impact.
c. Have environmental effects that will cause substantial adverse effects on human beings, either directly or indirectly?
Less than Significant Impact with Mitigation Incorporated. As analyzed throughout this IS/MND, incorporation of mitigation measures and conditions of approval would reduce Project impacts to a level that is less than significant. This document has concluded that the proposed Project would not have environmental effects that will cause direct or indirect substantial adverse effects on human beings.
7.c
Packet Pg. 487 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 94 Overall, impacts would be less than significant with mitigation measures and conditions of approval implemented.
7.c
Packet Pg. 488 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 95 4.0 REFERENCES
California Code of Regulations, Title 14, Chapter 3, Sections 15000 through 15387.
California Department of Conservation. CGS Information Warehouse: Mineral Land Classification, https://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=mlc. Accessed October 6, 2020.
California Department of Conservation. San Bernardino County Important Farmland 2016, DLRP Data Downloads. https://gis.conservation.ca.gov/portal/home/group.html?id= b1494c705cb34d01acf78f4927a75b8f#overview (accessed October 6, 2020).
California Department of Fish and Wildlife. California Natural Diversity Database, RareFind 5 and Biogeographic Information and Observation System online mapping tool. https://www.wildlife.ca.gov/Data/CNDDB/Maps-and-Data (accessed October 2020).
California Department of Forestry and Fire Protection (CAL FIRE). California State Geoportal, FHSZ in LRA, Website: https://gis.data.ca.gov/datasets/CALFIRE-Forestry::fhsz-in-lra?geometry=- 117.349%2C34.031%2C117.309%2C34.038. Accessed on October 8, 2020.
California Department of Transportation. California Scenic Highway Mapping System. San Bernardino County. http://www.dot.ca.gov/hq/LandArch/16_livability/scenic_highways/index.htm (accessed October 5, 2020).
City of Colton, General Plan Update Environmental Impact Report, May 2013.
City of Colton, City of Colton General Plan Mobility Element, Adopted by City Council on August 20, 2013.
City of Colton, City of Colton Vehicle Miles Traveled (VMT) Guidelines, Section 2.4 Transportation Projects, page 27. Website: https://www.ci.colton.ca.us/AgendaCenter/ViewFile/Item/2599?fileID=3138.
Accessed October 12, 2020.
City of Grand Terrace, Draft Program Environmental Impact Report City of Grand Terrace General Plan Update and Amendment No. 6 to the Redevelopment Plan for the Revised Grand Terrace Community Redevelopment Project, January 2010.
City of Grand Terrace, Fire, https://www.grandterrace-ca.gov/departments/fire (accessed October 7, 2020).
City of Grand Terrace, Police Services. https://www.grandterrace-ca.gov/departments/police_services (accessed October 7, 2020).
Dibblee, T.W., and Minch, J.A. 2002. Geologic Map of the Riverside East and San Bernardino South Quadrangles, Riverside and San Bernardino Counties, California. United States Geological Survey. https://ngmdb.usgs.gov/ngm-bin/pdp/zui_viewer.pl?id=34334 (accessed October 9, 2020).
Federal Highway Administration. 2006. Highway Construction Noise Handbook. August 2006. Roadway Construction Noise Model. HEP-06-015. DOT-VNTSC-FHWA-06-02. NTIS No. PB2006-109012.
7.c
Packet Pg. 489 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 96 https://www.fhwa.dot.gov/Environment/noise/construction_noise/rcnm/index.cfm (accessed July 26, 2019) (FHWA, 2006).
JLC Engineering & Consulting, Inc. Drainage Study for Barton Road Improvements, January 15, 2020, Revised March 2, 2020.
KOA. City of Colton and City of Grand Terrace Traffic Study Report: Barton Road Bridge Removal and Road Construction Project, February 2020.
LSA Associates, Inc. Air Quality Report Barton Bridge Removal and Road Construction, October 2020.
LSA Associates, Inc. Historic Property Survey Report for the Barton Road Bridge Removal and Road Construction, May 25, 2021.
LSA Associates, Inc. Barton Road Bridge Removal and Road Construction Project Technical Noise Memorandum, February 24, 2021.
Riverside County Airport Land Use Commission. 2004. Flabob Airport, Riverside County ALUCP—West County Airports Background Data.
Riverside County Airport Land Use Commission. Riverside Municipal Airport; Riverside County Airport Land Use Compatibility Plan, Volume 20 Policy Document. March 2005.
San Bernardino International Airport Authority. 2010. Airport Layout Plan Narrative Report for San Bernardino International Airport. September 22.
San Bernardino Valley Municipal Water District. 2015 Urban Water Management Plan. Page 15-13. June 2016.
South Coast Air Quality Management District, Final 2016 Air Quality Management Plan. March 2016.
State of California Department of Transportation, Barton Road Bridge and Road Construction Project Natural Environment Study (Minimal Impacts), July 2020.
State of California Department of Transportation, Historic Property Survey Report, August 6, 2020.
Terracon, Initial Site Assessment Barton Road Bridge Removal and Road Construction Project, July 29, 2020.
Terracon, Supplemental Hazardous Materials Survey Barton Road Bridge Removal and Road Construction, January 21, 2021.
Terracon, Limited Site Investigation and Aerially Deposited Lead Report Barton Road Bridge Removal and Road Construction Project, Project No. BRLS-5065(024); Bridge No. 54C-0379, Terracon, April 6, 2021.
United States Census Bureau. QuickFacts, Colton, City of, California. https://www.census.gov/quickfacts/ fact/table/coltoncitycalifornia/PST045219 (accessed October 5, 2020).
7.c
Packet Pg. 490 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 97 United States Fish and Wildlife Service. Information for Planning and Consultation, Facilities. https://ecos.fws.gov/ipac/location/VKT4QFYV5FHP5FCSEJAK4YRDEM/resources#facilities (accessed October 8, 2020).
United States Fish and Wildlife Service. Inventory of Rare and Endangered Plants. California Native Plant Society. http://www.rareplants.cnps.org/result.html?adv=t&cnps=1A:1B:2A:2B:3:4&fesa= FE:FT&quad=3411716 (accessed October 2020).
7.c
Packet Pg. 491 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 98 THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 492 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 99 5.0 MITIGATION MONITORING AND REPORTING PROGRAM
The Mitigation Monitoring and Reporting Program (MMRP) has been prepared for use in implementing mitigation for the Barton Road Bridge Removal and Road Construction Project.
The program has been prepared in compliance with State law and the Mitigated Negative Declaration (MND) prepared for the Project by the City of Colton.
CEQA requires adoption of a reporting or monitoring program for those measures placed on a project to mitigate or avoid adverse effects on the environment (Public Resource Code Section 21081.6). The law states the reporting or monitoring program shall be designed to ensure compliance during project implementation.
The MMRP contains the following elements:
1) The mitigation measures are recorded with the action and procedure necessary to ensure compliance.
In some instances, one action may be used to verify implementation of several mitigation measures. 2) A procedure for compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported.
3) The program has been designed to be flexible. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program.
As changes are made, new monitoring compliance procedures and records will be developed and incorporated into the program.
This Mitigation Monitoring and Reporting Program includes mitigation identified in the MND.
5.1 MANDATORY FINDINGS OF SIGNIFICANCE
As the Lead Agency, the City is responsible for ensuring full compliance with the mitigation measures adopted for the proposed project. The City will monitor and report on all mitigation activities. Mitigation measures will be implemented at different stages of development throughout the project site. In this regard, the responsibilities for implementation have been assigned to the Applicant, Contractor, or a combination thereof. If during the course of project implementation, any of the mitigation measures identified herein cannot be successfully implemented, the City shall be immediately informed, and the City will then inform any affected responsible agencies. The City, in conjunction with any affected responsible agencies, will then determine if modification to the project is required and/or whether alternative mitigation is appropriate.
5.2 STANDARD CONDITIONS
Standard Conditions are presented in instances where the proposed project would not create a significant impact but would be required to adhere to regulatory requirements in order to ensure impacts do not become significant. Standard Conditions outline compliance with various federal, State, and/or local acts, laws, rules, regulations, municipal codes, etc.
7.c
Packet Pg. 493 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 100
THIS PAGE INTENTIONALLY LEFT BLANK
7.c
Packet Pg. 494 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 101
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
MITIGATION MEASURES
AIR QUALITY
Mitigation Measure AQ-1: Prior to the
commencement of any construction activities, the
construction contractor shall submit a Construction
Emission Control Plan for review and approval to
the City of Colton Department of Public Works,
which shall be implemented during construction.
The Construction Emissions Control Plan shall
comply with federal, State, and local regulations as
specified in the measures below:
• The contractor shall adhere to the Caltrans
Standard Specifications for Construction,
Sections 14.9-01, 14.9-02, 14.9-03, 18-1.02C,
and 18-1.03 (or Greenbook equivalent
specifications). Section 14-9-02 specifically
requires compliance by the contractor with all
applicable laws and regulations related to air
quality, including air pollution control district
and air quality management district
regulations and local ordinances.
• Water or a dust palliative shall be applied to
the site and equipment as often as necessary
to control fugitive dust emissions. Fugitive
emissions generally must meet a “no visible
dust” criterion either at the point of emissions
or at the right-of-way line depending on local
regulations in compliance with the SCAQMD
Rule 403 (Fugitive Dust).
City of Colton
Department of
Public Works
Prior to
construction
activities.
Review and monitoring
by City of Colton
Department of Public
Works.
Halt in construction
activities.
7.c
Packet Pg. 495 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 102
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
• Soil binder shall be spread on any unpaved
roads used for construction purposes, and on
all project construction parking areas
(providing an estimated 50 percent reduction
of fugitive emissions) in compliance with the
SCAQMD Rule 403 (Fugitive Dust).
• Trucks shall be washed as they leave the rightof-way as necessary to control fugitive dust emissions in compliance with the SCAQMD
Rule 403 (Fugitive Dust).
• Construction equipment and vehicles shall be
properly tuned and maintained. All
construction equipment shall use low-sulfur
fuel as required by California Code of
Regulations (CCR) Title 17, Section 93114.
• A dust control plan shall be developed
documenting sprinkling, temporary paving,
speed limits, and timely revegetation of
disturbed slopes as needed to minimize
construction impacts to existing communities
in compliance with the SCAQMD Rule 403
(Fugitive Dust).
• Equipment and material storage sites shall be
located as far away from residential uses as
practicable. Construction areas shall be kept
clean and orderly in compliance with the
SCAQMD Rule 402 (Nuisance).
• Environmentally sensitive areas shall be
established near sensitive air receptors. Within
7.c
Packet Pg. 496 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 103
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
these areas, construction activities involving
the extended idling of diesel equipment or
vehicles shall be prohibited to the extent
feasible [as required by CCR Title 13, Section
2485(c)].
• Track-out reduction measures shall be used,
such as gravel pads at project access points to
minimize dust and mud deposits on roads
affected by construction traffic, in accordance
with the State Vehicle Code Section 23114,
with special attention to Sections 23114(b)(F),
(e)(2), and (e)(4).
• All transported loads of soils and wet materials
shall be covered before transport, or adequate
freeboard (space from the top of the material
to the top of the truck) shall be provided to
minimize emission of dust during
transportation in compliance with the
SCAQMD Rule 403.
• Dust and mud that are deposited on paved,
public roads due to construction activity and
traffic shall be promptly and regularly removed
to reduce PM emissions [State Vehicle Code
Section 23114, with special attention to
Sections 23114(b)(F), (e)(2), and (e)(4)].
• To the extent feasible, construction traffic shall
be scheduled and routed to reduce congestion
and related air quality impacts caused by idling
vehicles along local roads during peak travel
times (consistent with the traffic control plan
7.c
Packet Pg. 497 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 104
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
approved by the City of Colton Traffic
Engineer).
• Mulch shall be installed or vegetation planted
as soon as practical after grading to reduce
windblown PM in the area. Note that certain
methods of mulch placement, such as straw
blowing, may themselves cause dust and
visible emission issues and may require
controls such as dampened straw [Caltrans
Standard Specifications for Construction,
Sections 18.1-02C (Dust Control Binders) and
18-1.03 (Construction – Dust Palliatives) or
Greenbook equivalent].
BIOLOGICAL RESOURCES
Mitigation Measure BIO-1: Prior to construction,
an approved bat biologist shall be retained by the
Project proponent to conduct a bat assessment
survey to determine the presence or absence of bat
species that may occur within the Project limits.
Should the presence of bat species be determined
during this assessment, the following measures
shall be implemented:
• Nighttime exit counts and acoustic surveys
shall be performed by a qualified bat biologist
at all structures and palm trees that may be
subject to project-related impacts. These
surveys shall be performed during the
recognized bat maternity season (April 1
through August 31, but preferably in June or
July) and as far in advance of construction as
City of Colton
approved Bat
Biologist.
Prior to and
during
construction
activities.
Monitoring by Bat
Biologist.
Stop construction
activities until issues
resolved.
7.c
Packet Pg. 498 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 105
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
possible in order to provide adequate time for
mitigation planning.
• Construction activities at structures housing
maternity colonies shall be coordinated with
an approved bat biologist and CDFW.
• If direct impacts to bat-roosting habitat are
anticipated, humane evictions and exclusions
of roosting bats shall be performed under the
supervision of an approved bat biologist after
August 31 in the fall (September or October)
prior to any work activities that would result in
direct impacts or direct mortality to roosting
bats. This action shall be performed in
coordination with the CDFW. To avoid
potential mortality of flightless juvenile bats,
evictions and exclusions of bats cannot be
performed during the maternity season (April
1 through August 31). Winter months are also
inappropriate for bat eviction because not all
individuals in a roost will emerge on any given
night. In addition, long-distance movements to
other roost sites are more difficult during the
winter when prey availability is scarce,
resulting in high mortality rates of evicted bats.
• Alternative bat-roosting habitat structures
shall be installed on the structures prior to the
eviction/exclusion of bats from that structure.
The design, numbers, and locations of these
roost structures shall be determined in
consultation with an approved bat biologist.
7.c
Packet Pg. 499 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 106
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
• If permanent, direct impacts to bat-roosting
habitat are anticipated and a humane
eviction/exclusion is performed, alternative
permanent roosting habitat shall be provided
to ensure no net loss of bat-roosting habitat.
This action shall be coordinated with the
CDFW, and locations of these roost structures
shall be determined in consultation with an
approved bat biologist to ensure that the
installed habitat provides adequate mitigation
for impacts.
• The loss of a night roost can negatively affect
the use of a foraging area, and consequently
may result in reduced fecundity in species that
are already slow to reproduce. If night roosting
is confirmed at any of the structures within the
proposed Project area, the following measure
to minimize potential impacts to nightroosting and foraging bats shall be implemented:
o At structures where night roosting is
suspected or confirmed, work shall be
limited to the daylight hours to the
greatest extent feasible to avoid potential
disruption of foraging. If night work
cannot be avoided, night lighting shall be
focused only on the area of direct work,
airspace access to and from the roost
features of the structure shall not be
obstructed, and light spillover into the
7.c
Packet Pg. 500 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 107
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
adjacent foraging areas shall be minimized
to the greatest extent feasible.
Mitigation Measure BIO-2: If feasible, project
construction and any vegetation removal should
begin outside of bird breeding season (typically
between September 1 and February 14). In the
event that project construction cannot be
conducted outside the bird breeding season, and
vegetation will be removed, focused surveys shall
be conducted by a qualified biologist prior to
ground-disturbing activities. Should nesting birds
be found, an exclusionary buffer shall be
established by a qualified biologist. The buffer may
be up to 500 feet in diameter depending on the
species of nesting bird found. This buffer shall be
clearly marked in the field by construction
personnel under guidance of the qualified biologist,
and construction or clearing shall not be conducted
within this zone until the qualified biologist
determines that the young have fledged or the nest
is no longer active. Nesting bird habitat within the
BSA shall be resurveyed during bird breeding
season if there is a lapse in construction activities
longer than seven days.
Qualified
Biologist
retained by the
City.
Prior to
construction
and between
September 1
and February
14. Monitoring by Qualified
Biologist.
Stop construction
activities until issues
resolved.
CULTURAL RESOURCES
Mitigation Measure CUL-1: If deposits of
prehistoric or historical archaeological materials
are discovered during non-monitored Project
activities, all work within 25 feet of the discovery
shall be redirected and a qualified archaeologist
Qualified
Archaeologist
retained by
the City.
During
construction.
Monitoring by Qualified
Archaeologist.
Stop construction
activities until issues
resolved.
7.c
Packet Pg. 501 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 108
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
contacted, if one is not present, to assess the
situation, consult with agencies as appropriate, and
make recommendations for the treatment of the
discovery. The City of Colton and Grand Terrace
shall also be notified. Project personnel shall not
collect or move any archaeological materials
uncovered by construction activities.
Any adverse impacts to the finds shall be avoided
by Project construction activities. If avoidance is
not feasible, the archaeological deposits shall be
evaluated to determine if they qualify as a historical
resource or unique archaeological resource, or as
historic property. If the deposits do not so qualify,
avoidance is not necessary. If the deposits do so
qualify, adverse impacts on the deposits shall be
avoided, or such impacts shall be mitigated.
Mitigation may consist of, but is not limited to,
recovery and analysis of the archaeological deposit;
recording the resource; preparing a report of
findings; and accessioning recovered
archaeological materials at an appropriate curation
facility. Educational public outreach may also be
appropriate. Upon completion of the assessment,
the archaeologist shall prepare a report
documenting the methods and results, and provide
recommendations for the treatment of the
archaeological deposits discovered. The report
shall be submitted to the City of Colton and City of
Grand Terrace.
7.c
Packet Pg. 502 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 109
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
GEOLOGY AND SOILS
Mitigation Measure GEO-1: Prior to issuance of
grading permits, the City of Colton shall verify that
the following note is included on the construction
plans:
“If paleontological resources are encountered
during the course of ground disturbance, work
within 60 feet of the find shall be halted and an
exclusionary buffer shall be established. A
paleontologist shall be contacted to assess the
find for scientific significance. No grounddisturbing activity within the 60-foot exclusionary buffer may occur without the
consent of the paleontologist and the City of
Colton. If determined to be significant, the
fossil(s) shall be collected from the field. The
paleontologist may also make
recommendations regarding additional
mitigation measures, such as paleontological
monitoring. Scientifically significant resources
shall be prepared to the point of identification,
identified to the lowest taxonomic level
possible, cataloged, and curated into the
permanent collections of a museum
repository. If scientifically significant
paleontological resources are collected, a
report of findings shall be prepared to
document the collection.”
This measure shall be implemented to the
satisfaction of the City of Colton.
City of Colton Prior to issuance
of grading
permits and
during
construction.
Qualified Paleontologist
retained by the City.
Stop construction
activities until issues
resolved.
7.c
Packet Pg. 503 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 110
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
HAZARDS AND HAZARDOUS MATERIALS
Mitigation Measure HAZ-1: Prior to the
commencement of Project construction, a soil
management plan shall be developed to identify
the appropriate and applicable procedures to be
followed with respect to worker health and safety
during future excavations and construction
activities in areas of potential soil impact.
The soil management plan shall detail the
appropriate and applicable local, State, and federal
regulations regarding the proper characterization,
treatment, and/or disposal of any impacted soils
encountered during excavation or construction
activities. Any impacted soil encountered shall be
appropriately handled pursuant to the project soil
management plan.
City of Colton
Public Works
Department
Prior to
construction.
Preparation of projectspecific Soil Management
Plan.
Delay start of
construction
activities.
Mitigation Measure HAZ-2: During construction,
the Project contractor shall comply with the
occupational Safety and Health Administration
Standard 1926.6 related to lead abatement, and all
other applicable state and federal requirements for
handling and disposal of LBP, ACM, and universal
wastes. AS ACM, LBP and chromium has been
detected in features existing on the Project site,
these materials, during Project construction, shall
be abated and removed from the site in accordance
with all applicable regulations, including
Occupational Safety and Health Administration
requirements. The City of Colton shall verify that
the abatement and removal of ACM, LBP and
Project
construction
contractor.
During
construction.
City of Colton Public
Works Department.
Stop construction
activities until issues
resolved.
7.c
Packet Pg. 504 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 111
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
chromium has been completed prior to any
development activities on the Project site.
TRIBAL CULTURAL RESOURCES
Mitigation Measure TCR-1: In the event that
cultural resources are discovered during project
activities, all work in the immediate vicinity of the
find (within a 60-foot buffer) shall cease and a
qualified archaeologist meeting Secretary of
Interior standards shall be hired to assess the find.
Work on the other portions of the project outside
of the buffered area may continue during this
assessment period. Additionally, the San Manuel
Band of Mission Indians Cultural Resources
Department (SMBMI) shall be contacted, as
detailed within TCR-2, regarding any pre-contact
and/or historic-era finds and be provided
information after the archaeologist makes his/her
initial assessment of the nature of the find, so as to
provide Tribal input with regards to significance
and treatment.
If significant pre-contact and/or historic-era
cultural resources, as defined by CEQA (as
amended, 2015), are discovered and avoidance
cannot be ensured, the archaeologist shall develop
a Monitoring and Treatment Plan, the drafts of
which shall be provided to SMBMI for review and
comment, as detailed within TCR-2. The
archaeologist shall monitor the remainder of the
project and implement the Plan accordingly.
City of Colton
Public Works
Department
Prior to
construction.
Submittal of evidence the
stated measures are
included on construction
documents
Withold demoliton
grading/construction
permits
7.c
Packet Pg. 505 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 112
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
If human remains or funerary objects are
encountered during any activities associated with
the project, work in the immediate vicinity (within
a 100-foot buffer of the find) shall cease and the
County Coroner shall be contacted pursuant to
State Health and Safety Code §7050.5 and that
code enforced for the duration of the project.
Mitigation Measure TCR-2: The San Manuel Band
of Mission Indians Cultural Resources Department
(SMBMI) shall be contacted if any pre-contact
and/or historic-era cultural resource(s) are
discovered during project implementation, and be
provided information regarding the nature of the
find, so as to provide Tribal input with regard to
significance and treatment.
Should the find be deemed significant, as defined
by CEQA (as amended, 2015), a cultural resources
Monitoring and Treatment Plan shall be created by
the archaeologist, in coordination with SMBMI, and
all subsequent finds shall be subject to this Plan.
Should SMBMI elect to place a monitor on site, this
Plan shall allow for a monitor to be present that
represents SMBMI for the remainder of the project.
Any and all archaeological/cultural documents
created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall
be supplied to the applicant and Lead Agency for
dissemination to SMBMI. The Lead Agency and/or
applicant shall, in good faith, consult with SMBMI
throughout the life of the project.
City of Colton
Public Works
Department
Prior to
construction.
Submittal of evidence the
stated measures are
included on construction
documents
Withold demoliton
grading/construction
permits
7.c
Packet Pg. 506 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 113
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
STANDARD CONDITIONS
HYDROLOGY AND WATER QUALITY
SC HYD-1: Prior to the issuance of a grading permit,
the City of Colton Public Works Department shall
file and obtain a Notice of Intent (NOI) with the
RWQCB in order to be in compliance with the State
National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit
for discharge of surface runoff associated with
construction activities. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger’s
Identification Number) shall be retained by the City
of Colton and submitted to Caltrans for coverage
under the NPDES General Construction Permit. The
NOI shall address the potential for an extended and
discontinuous construction period based on
funding availability. This measure shall be
implemented to the satisfaction of the Director of
the City Engineering Division of the Public Works
Department or designee.
City of Colton
Public Works
Department.
Prior to issuance
of grading
permit.
City Director Construction does
not start until issue is
resolved.
SC HYD-2: Prior to the issuance of a grading permit,
the City of Colton Public Works Department shall
prepare a Storm Water Pollution Prevention Plan
(SWPPP). The SWPPP shall include a surface water
control plan and erosion control plan citing specific
measures to control on-site and off-site erosion
during the entire construction period. In addition,
the SWPPP shall emphasize structural and
nonstructural Best Management Practices (BMPs)
to control sediment and non-visible discharges
City of Colton
Public Works
Department.
Prior to issuance
of grading
permit.
City Director Construction does
not start until issue is
resolved.
7.c
Packet Pg. 507 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 114
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
from the Project site. The SWPPP shall include
inspection forms for routine monitoring of the site
during both the grading and construction phases to
ensure National Pollutant Discharge Elimination
System (NPDES) compliance and that additional
BMPs and erosion control measures will be
documented in the SWPPP and utilized if necessary.
The SWPPP shall address the potential for an
extended and discontinuous construction period
based on funding availability. The SWPPP shall be
kept on site for the entire duration of Project
construction and shall be available to the local
RWQCB for inspection at any time. BMPs to be
implemented may include the following:
• Sediment discharges from the site may be
controlled by the following: sandbags, silt
fences, straw wattles and temporary basins (if
deemed necessary), and other discharge
control devices. The construction and
condition of the BMPs shall be periodically
inspected during construction, and repairs
shall be made when necessary as required by
the SWPPP.
• Materials that have the potential to contribute
to non-visible pollutants to storm water must
not be placed in drainage ways and must be
contained, elevated, and placed in temporary
storage containment areas.
• All loose piles of soil, silt, clay, sand, debris, and other earthen material shall be protected in a
7.c
Packet Pg. 508 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 115
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
reasonable manner to eliminate any discharge
from the site. Stockpiles shall be surrounded
by silt fences and covered with plastic tarps.
• In addition, the construction contractor shall
be responsible for performing and
documenting the application of BMPs
identified in the SWPPP. Weekly inspections
shall be performed on sandbag barriers and
other sediment control measures called for in
the SWPPP. Monthly reports and inspection
logs shall be maintained by the contractor and
reviewed by the City of Colton and the
representatives of the State Water Resources
Control Board. In the event that it is not
feasible to implement specific BMPs, the City
of Colton can make a determination that other
BMPs will provide equivalent or superior
treatment either on or off site.
This measure shall be implemented to the
satisfaction of the Director of the City of Colton
Public Works Department or his/her designee.
SC HYD-3: Prior to issuance of a grading permit, the
City of Colton Public Works Department shall
submit evidence to Caltrans and put into the
Project’s administrative record that the Low Impact
Development (LID) Best Management Practices
(BMPs) specified in a Final Water Quality
Management Plan (a Preliminary WQMP) shall be
written into the grading and development plans
submitted to the City for review and approval to
City of Colton
Public Works
Department.
Prior to issuance
of grading
permit.
City Director Construction does
not start until issue is
resolved.
7.c
Packet Pg. 509 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT 116
Project Name: Barton Road Bridge Removal and Road Construction Project Applicant: City of Colton Date: June 2021
Mitigation Measure No. / Implementing Action
Responsible
for Monitoring
Timing of
Verification Method of Verification
Verified
Date/ Initials
Sanctions for NonCompliance
manage water quality and hydrologic effects of the
proposed Project. Specifically, the LID BMPs shall
be implemented to ensure the Project meets or
exceeds the minimum design capture volume of
the site.
Periodic maintenance of LID BMPs during Project
operation shall be in accordance with the schedule
outlined in a Final WQMP. This measure shall be
implemented to the satisfaction of the Director of
the City of Colton Public Works Department or
designee.
7.c
Packet Pg. 510 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
BARTON ROAD BRIDGE REMOVAL AND ROAD CONSTRUCTION PROJECT
APPENDIX A
AIR QUALITY REPORT
7.c
Packet Pg. 511 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction December 2020
AIR QUALITY REPORT
Barton Bridge Removal and Road Construction Project
City of Colton and City of Grand Terrace
San Bernardino County, California
Federal Aid Project No. BRLS 5065(024)
Prepared by
LSA Associates, Inc.
703 Palomar Airport Road, Suite 280
Carlsbad, California 92011
Prepared for
City of Colton
Department of Public Works
160 South 10th Street
Colton, California 92324
Submitted to
California Department of Transportation, District 8
Planning and Local Assistance
64 West 4th Street, 6th Floor (MS-760)
San Bernardino, California 92401-1400
This document contains blank pages to accommodate two-sided printing.
7.c
Packet Pg. 512 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction This page intentionally left blank
7.c
Packet Pg. 513 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction December 2020
AIR QUALITY REPORT
Barton Bridge Removal and Road Construction Project
CITIES OF COLTON AND GRAND TERRACE
SAN BERNARDINO COUNTY, CALIFORNIA
and
CALIFORNIA DEPARTMENT OF TRANSPORTATION DISTRICT 8
FEDERAL PROJECT ID NUMBER BRLS 5065(024)
Prepared by: __________________________________________________ Date: October 8, 2020 Michael Slavick
Senior Air Quality Specialist
703 Palomar Airport Road, Suite 280
Carlsbad, California 92011
Reviewed by: __________________________________________________ Date: _________________________ Antonia Toledo Senior Environmental Planner
California Department of Transportation, District 8
464 West 4th Street
San Bernardino, California 92401
For individuals with sensory disabilities, this document is available in alternative formats.
Please call or write to the California Department of Transportation, Attn: Kiet Ly, ADA Liaison (909) 383-4284, or use the California Relay Service TTY number, 711, or 1-800-735-2922.
7.c
Packet Pg. 514 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction This page intentionally left blank
7.c
Packet Pg. 515 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Contents
i
Contents
1. Proposed Project Description .................................................................................................. 1
1.1 Introduction ............................................................................................................................................................. 1
1.2 Location and Background .................................................................................................................................. 1
1.3 Purpose and Need ................................................................................................................................................ 7
1.3.1 Purpose ...................................................................................................................................................... 7
1.3.2 Need ........................................................................................................................................................... 8
1.4 Baseline and Forecast Conditions for No Build and Build Alternatives ............................................ 8
1.4.1 Existing Roadways and Traffic Conditions .................................................................................... 8
1.4.2 No Build Alternative ............................................................................................................................. 9
1.4.3 Project Build Alternative ................................................................................................................... 10
1.4.4 Comparison of Existing/Baseline and Build Alternatives ..................................................... 12
1.5 Construction Activities and Schedule ......................................................................................................... 13
2. Regulatory Setting .................................................................................................................... 15
2.1 Pollutant-Specific Overview ............................................................................................................................ 15
2.1.1 Criteria Pollutants ............................................................................................................................... 15
2.1.2 Mobile Source Air Toxics .................................................................................................................. 15
2.1.3 Greenhouse Gases .............................................................................................................................. 20
2.1.4 Asbestos ................................................................................................................................................. 21
2.2 Regulations ........................................................................................................................................................... 22
2.2.1 Federal and California Clean Air Acts .......................................................................................... 22
2.2.2 Transportation Conformity .............................................................................................................. 22
2.2.3 National Environmental Policy Act ............................................................................................... 23
2.2.4 California Environmental Quality Act .......................................................................................... 23
2.2.5 Local ......................................................................................................................................................... 23
3. Affected Environment ............................................................................................................. 25
3.1 Climate, Meteorology, and Topography .................................................................................................... 25
3.2 Existing Air Quality ............................................................................................................................................. 26
3.2.1 Criteria Pollutants and Attainment Status ................................................................................. 26
3.2.2 Mobile Source Air Toxics .................................................................................................................. 29
3.2.3 Greenhouse Gas and Climate Change ........................................................................................ 31
3.3 Sensitive Receptors ............................................................................................................................................ 31
3.4 Conformity Status ............................................................................................................................................... 31
3.4.1 Regional Conformity .......................................................................................................................... 35
3.4.2 Project-Level Conformity ................................................................................................................. 36
3.4.3 Interagency Consultation ................................................................................................................ 36
3.5 NEPA Analysis/Requirement ........................................................................................................................... 36
3.6 CEQA Analysis/Requirement .......................................................................................................................... 37
4. Environmental Consequences ............................................................................................... 39
7.c
Packet Pg. 516 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Contents
ii
4.1 Impact Criteria ..................................................................................................................................................... 39
4.2 Short-Term Effects (Construction Emissions) ........................................................................................... 39
4.2.1 Construction Equipment, Traffic Congestion, and Fugitive Dust ..................................... 39
4.2.2 Asbestos ................................................................................................................................................. 42
4.2.3 Lead .......................................................................................................................................................... 42
4.3 Long-Term Effects (Operational Emissions) .............................................................................................. 43
4.3.1 Carbon Monoxide Analysis ............................................................................................................. 44
4.3.2 PM Analysis ........................................................................................................................................... 47
4.3.3 Nitrogen Dioxide Analysis ............................................................................................................... 48
4.3.4 Mobile Source Air Toxics Analysis ................................................................................................ 48
4.3.5 Greenhouse Gas Emission Analysis .............................................................................................. 49
4.4 Cumulative/Regional/Indirect Effects ......................................................................................................... 50
5. Minimization Measures .......................................................................................................... 53
5.1 Short-Term (Construction) .............................................................................................................................. 53
5.2 Long-Term (Operational) ................................................................................................................................. 54
6. Conclusions ................................................................................................................................ 57
7. References .................................................................................................................................. 59
8. Appendices ................................................................................................................................ 63
7.c
Packet Pg. 517 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Appendices
iii
List of Appendices
Appendix A: RTP and FTIP Listings for the Project
Appendix B: Transportation Air Quality Conformity Findings Checklist Appendix C: Construction Emission Calculations
Appendix D: Operational Emission Calculations
Appendix E: CO Flow Chart (Based on the CO Protocol)
7.c
Packet Pg. 518 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Appendices
iv
This page intentionally left blank
7.c
Packet Pg. 519 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Tables
v
List of Tables
Table 1-1. Summary of Existing Traffic Conditions ...................................................................................................... 9 Table 1-2. Summary of Future No Build Traffic Conditions .................................................................................. 10 Table 1-3. Summary of Build Alternative Traffic Conditions ................................................................................. 12 Table 1-4. Summary of Long-Term Operational Impacts on Traffic Conditions of Existing, No Build, and Build Alternatives ...................................................................................................................................... 13 Table 2-1. State and Federal Criteria Air Pollutant Standards and Status for San Bernardino County – South Coast Air Basin ................................................................................................................................ 16 Table 2-2. Air Pollutant Effects and Sources ............................................................................................................... 18 Table 3-1. State and Federal Attainment Status for the South Coast Air Basin ............................................ 29 Table 3-2. Air Quality Concentrations for the Past Five Years Measured at San Bernardino 4th Street Monitoring Station ............................................................................................................................................ 30 Table 3-3. Mobile Source Air Toxics Measured Concentrations in the Project Vicinity ............................. 30 Table 3-4. Status of Plans Related to Regional Conformity .................................................................................. 36 Table 4-1. Maximum Daily Project Construction Emissions ................................................................................. 40 Table 4-2. 2023 Opening Year and 2045 Horizon Year Regional Vehicle Emissions ................................... 43 Table 4-3. Project Construction Greenhouse Gas Emissions ................................................................................ 49 Table 4-4. Modeled Annual CO2 Emissions and Vehicle Miles Traveled, by Alternative ............................ 50
7.c
Packet Pg. 520 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Tables
vi
This page intentionally left blank
7.c
Packet Pg. 521 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Figures
vii
List of Figures
Figure 1-1. Project Location ................................................................................................................................................. 3 Figure 1-2. Proposed Project ............................................................................................................................................... 5 Figure 2-1. Projected National MSAT Trends, 2010–2050 ..................................................................................... 19 Figure 3-1. Predominant Wind Patterns at the San Bernardino County Yard at 24302 4th Street Monitoring Station. ........................................................................................................................................................ 26 Figure 3-2. Map of Air Quality Monitoring Station Located Near the Project .............................................. 27 Figure 3-3. Sensitive Receptors Located Near the Proposed Project. .............................................................. 33 Figure 5-1. The Governor’s Climate Change Pillars: 2030 Greenhouse Gas Reduction Goals ................ 55
7.c
Packet Pg. 522 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction List of Figures
viii
This page intentionally left blank
7.c
Packet Pg. 523 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Acronyms and Abbreviations
ix
Acronyms and Abbreviations
Term Definition
°F degrees Fahrenheit
AASHTO American Association of State Highway and Transportation Officials AB Assembly Bill
ACM asbestos-containing materials
ADA Americans with Disabilities Act
ADL Aerially Deposited Lead
ADT Annual Daily Traffic
APN Assessor’s Parcel Number
AQMP Air Quality Management Plan
CAAA Clean Air Act Amendments
Caltrans California Department of Transportation
CARB California Air Resources Board
CCAA California Clean Air Act
CCR California Code of Regulations
CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CH4 methane
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
cy cubic yard
EMFAC California Emission Factor Model
EO (California) Executive Order
FCAA Federal Clean Air Act
FHWA Federal Highway Administration
FTA Federal Transit Administration
FTIP Federal Transportation Improvement Program
7.c
Packet Pg. 524 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Acronyms and Abbreviations
x
Term Definition
GHG greenhouse gas
Guidance U.S. EPA’s Transportation Conformity Guidance for Quantitative Hot-Spot Analyses in PM2.5 and PM10 Nonattainment and Maintenance Areas GWP global warming potential
HBP Federal Highway Bridge Program
H2S hydrogen sulfide
I-215 Interstate 215
LOS level of service
MOVES Motor Vehicle Emission Simulator
MSAT mobile source air toxics
MMTCO2e million metric tons carbon dioxide equivalent
MTCO2e metric tons carbon dioxide equivalent
NAAQS National Ambient Air Quality Standards
NEPA National Environmental Policy Act
NHTSA National Highway Traffic Safety Administration
NO2 nitrogen dioxide
NOx nitrogen oxide
N2O nitrous oxide
O3 ozone
Pb lead
PM particulate matter
PM2.5 particulate matter less than 2.5 microns in diameter PM10 particulate matter less than 10 microns in diameter POAQC Project of Air Quality Concern
ppm parts per million
Project Barton Road Bridge Removal and Road Construction Project ROG reactive organic gases
RTP Regional Transportation Plan
SB Senate Bill
SCAG Southern California Association of Governments
7.c
Packet Pg. 525 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Acronyms and Abbreviations
xi
Term Definition
SCAQMD South Coast Air Quality Management District
SCS Sustainable Communities Strategy
SIP State Implementation Plan
SO2 sulfur dioxide
TAC toxic air contaminant
TCWG SCAG Transportation Conformity Working Group
UPRR Union Pacific Railroad
USC United States Code
USDOT United States Department of Transportation
U.S. EPA United States Environmental Protection Agency
VMT vehicle miles traveled
VOC volatile organic compounds
7.c
Packet Pg. 526 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Acronyms and Abbreviations
xii
This page intentionally left blank
7.c
Packet Pg. 527 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
1 1. Proposed Project Description
1.1 Introduction
The Cities of Grand Terrace and Colton, in coordination with the California Department of Transportation (Caltrans) District 8, propose to replace the existing two lane bridge on Barton Road over the Union Pacific Railroad tracks (UPRR) between the two cities (proposed Project). The proposed Project will fill the area over the abandoned railroad tracks with on-site earth and build a new two-lane asphalt road at-grade level as shown in Figures 1-1 and 1-2. The new at-grade asphalt road will include pedestrian sidewalks and Class II bicycle lanes in each direction. The purpose of the proposed Project is to reduce congestion and improve pedestrian and bicyclist safety on Barton Road between Terrace Avenue and Grand Terrace Avenue. There will be minor seismic activity contribution during bridge removal. The City of Colton will be the implementing lead agency for design and construction.
The proposed Project will include paving a 1,100-foot long section of Barton Road, between Terrace and Grand Terrace Avenues. East of the Project, westbound Barton Road provides two lanes that are reduced to one lane approximately 400 feet from the end of the Project boundary. The roadway will accommodate a 6-foot wide sidewalk on the north and south sides of Barton Road, an 8-foot wide striped Class II bicycle lane on each side of the roadway, and two 14-foot wide travel lanes. These lane configurations transition to join existing improvements west of Grand Terrace Avenue.
The City of Colton is the lead agency under the California Environmental Quality Act (CEQA).
Because the Project would use federal funds, Caltrans District 8 is the lead agency under the National Environmental Policy Act (NEPA), as assigned by the Federal Highway Administration (FHWA) through NEPA delegation.
1.2 Location and Background
Within the Project limits, Barton Road is bordered by a single-family residence, commercial businesses, a distribution warehouse, a construction storage yard, and a business park. The Project will remove the 25-foot wide Barton Road Bridge, originally built in 1936, as it has been determined to be structurally unsound and does not provide adequate pedestrian or bicycle access. The removal of the Barton Road Bridge (State Bridge No. 54C0379) will allow needed Class II bicycle lanes meeting the requirements of both the Cities of Grand Terrace and Colton.
The Cities, in association with Caltrans, propose to widen the area of the newly built roadway on either side of the Barton Road Bridge. The existing pedestrian path on the bridge has been closed to pedestrians due to safety concerns. The UPRR tracks no longer exist underneath the bridge and, since the bridge is being removed, the areas underneath the bridge will be filled in with earth to
7.c
Packet Pg. 528 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
2 This page intentionally left blank
7.c
Packet Pg. 529 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction I:\CNS1901\G\Project Location.cdr (10/5/2020)
§¨215
CENTER STREET
Project Locaon
SOURCE: USGS 7.5' Quad - San Bernardino South (1980), CA FIGURE 1-1
Barton Road Bridge Removal
and Road Construcon Project
Project Locaon 0 1000 2000
FEET
LEGEND
Project Locaon
BRLS 5056 (024)
San Bernardino
County
Riverside
County
Ã18
Ã330
Ã173
Ã38
Ã210
Ã60
Ã91
Project
Locaon §¨15
§¨215
§¨10
Project Vicinity
7.c
Packet Pg. 530 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
4 This page intentionally left blank
7.c
Packet Pg. 531 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction Service Layer Credits:
027522344
116712104 116712102
027522327
027522362
027522324
116705102
027522358
027522322
116712107
116712108
116705115
027522326
027522325
116712106
116705118
116712103
TERRACE AV
BARTON RD
LEGEND
Project Limits
Existing Right-of-Way/Parcel Boundaries
Proposed Project Features
New Pavement
Curb/Gutter
Driveway
Toe of Slope
Sidewalk
Staging Area
Right-of-Way Acquisition
Slope/Drainage Easement
Temporary Construction Easement
SOURCE: Nearmap (10/13/2020); CNS Engineering (5/19/2020 and 7/13/2020); County of San Bernardino (4/2019) I:\CNS1901\GIS\MXD\AQ\ProposedProjectSite.mxd (12/17/2020) FIGURE 1-2
Barton Road Bridge Removal
and Road Construction Project
Proposed Project
BRLS 5056 (024)
0 40 80
FEET
7.c
Packet Pg. 532 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
6 This page intentionally left blank
7.c
Packet Pg. 533
Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
7 make the new at-grade level roadway. The newly widened roadway will include an 8-foot wide bicycle path and 6-foot wide pedestrian sidewalk on both sides. The proposed Project is listed in the financially constrained list of projects in the 2016 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) under the Federal Highway Bridge Program (HBP) ID# 1056 (see Appendix A). The 2016 RTP was approved by the Regional Council of the Southern California Association of Governments (SCAG) on April 7, 2016, with ongoing amendments as needed, with Amendment No. 2 adopted on July 6, 2017.
The proposed Project is listed in the 2016 financially constrained RTP/SCS Amendment No. 2, which was found to conform by SCAG on July 6, 2017, and by the Federal Transit Administration (FTA)/FHWA on August 1, 2017. On September 6, 2018, SCAG’s Regional Council adopted the 2016 RTP/SCS Amendment No. 3 but conformity determination approval from the FHWA is pending. The proposed Project is listed in the 2017 Federal Transportation Improvement Program (FTIP) 17-00 under ID No. SDBSL08. The 2017 FTIP Consistency Amendment 17–18 was approved by SCAG on February 23, 2018, and by FTA/FHWA on March 26, 2018. The design concept and scope of the proposed Project is consistent with the project description in the 2016 RTP and 2017 FTIP and the “open to traffic” assumptions of the SCAG’s regional emissions analysis.
Under the HBP, the project description for the Barton Road Bridge Removal and Road Construction Project is as follows:
BRIDGE NO. 54C0379, BARTON RD, OVER UP RR, 0.25 MI W ROUTE 215. REPLACE 2-LANE BRIDGE WITH NEW 2-LANE ASPHALT ROADWAY, MINOR SEISMIC CONTRIBUTION. THE CITY OF COLTON WILL BE THE IMPLEMENTING AGENCY FOR DESIGN AND CONSTRUCTION.
1.3 Purpose and Need
The proposed Project will dismantle and remove the Barton Road Bridge (State Bridge No. 54C0379), which has been determined to be structurally unsuitable. The road replacement comes as a viable alternative to replacing the bridge over the now-abandoned UPRR tracks. The goal is to provide a new at-grade level road with Class II bicycle paths and pedestrian sidewalks. The newly constructed roadway will be suitable for heavy duty trucks, passenger vehicles, commercial delivery vehicles, Class II bicycle lanes, and pedestrian sidewalks. The removal of the Barton Road Bridge will allow for needed Class II bicycle lanes meeting the requirements of the Cities of Grand Terrace and Colton.
1.3.1 Purpose
The purpose of the project is to provide safe connectivity between La Cadena Drive and the Barton Road/Interstate 215 (I-215) interchange and to facilitate efficient access between the Cities of Colton and Grand Terrace.
7.c
Packet Pg. 534 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
8 1.3.2 Need
Barton Road Bridge was originally built in 1936 as a two-lane bridge over the Union Pacific Railroad (UPRR) railroad tracks (one lane in each direction). The bridge is structurally unsound and the 25-foot wide bridge deck does not provide adequate pedestrian or bicycle access. The sidewalk that exists on the bridge has been shut down for safety reasons. A review of the existing bridge’s As Built plans shows the design philosophy of the bridge does not account for seismic loading, which is critical for public safety in California. The Bridge Inspection Report shows a low sufficiency rating of 58.8 due to low load rating and a roadway geometry that does not meet the current standards of the American Association of State Highway and Transportation Officials (AASHTO). The railroad tracks below the bridge have been abandoned and removed. There is no longer the need to span the railroad tracks with a bridge.
1.4 Baseline and Forecast Conditions for No Build and
Build Alternatives
The proposed alternatives include the No Build and Build Alternative for opening year 2023 and horizon year 2045. The Project alternatives are described below. Previously referenced Figure 1-2 shows the features of the Build Alternative.
1.4.1 Existing Roadways and Traffic Conditions
The Barton Road Bridge Removal and Road Construction Project is located in the City of Colton at the southern city limit with the neighboring City of Grand Terrace. The City of Colton is proposing to remove an existing 175-foot long by 25-foot wide bridge. The two-lane bridge on Barton Road is approximately 0.25 mile east of La Cadena Drive and 0.25 mile west of the Interstate 215 (I-215) interchange (KOA 2020). The pedestrian pathway on the Barton Road Bridge has been closed to foot and bicycle traffic as it has been deemed unsafe for pedestrian use. The Barton Road Bridge has a posted speed limit of 35 miles per hour on the west side of the bridge. The Baseline (year) used for the analysis is 2019 because those are the most recent traffic data available. Table 1-1 lists the existing (2019) traffic data for the Barton Road between S. La Cadena Drive and Grand Terrace Road.
7.c
Packet Pg. 535 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
9 Table 1-1. Summary of Existing Traffic Conditions
Scenario/
Analysis Year Location
ADT
%
Truck
VMT
(miles) LOS
Average
Speed During
Peak Travel
(mph)
Average
Speed During
Off-Peak
Travel (mph)
Total Truck
Existing/Baseline
Year 2019
Barton Road
between S. La
Cadena Drive &
Grand Terrace
Road
8,776 1,303 14.8 4,668 B 35 35
Source: Traffic Study Report (KOA 2020).
ADT = average daily traffic
LOS = level of service
mph = miles per hour
VMT = vehicle miles traveled
1.4.2 No Build Alternative
The No Build Alternative assumes that no bridge removal or improvements are made to Barton Road.
The No Build Alternative would maintain the existing conditions and provides a baseline for comparison of the impacts under the Build Alternative. Under the No Build Alternative, roadway performance would continue to deteriorate with the forecast increase in traffic.
Under NEPA, the No Build (No Action) Alternative consists of those transportation projects that are already planned for construction by or before opening year 2023. Consequently, the No Build alternative represents future travel conditions in the Barton Road study area without the Project and is the baseline against which the Build Alternative will be assessed to meet NEPA requirements.
Table 1-2 lists the No Build traffic data for the Opening Year 2023 and Horizon Year 2045 for Barton Road between S. La Cadena Drive and Grand Terrace Road.
7.c
Packet Pg. 536 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
10 Table 1-2. Summary of Future No Build Traffic Conditions Scenario/
Analysis
Year
Location
ADT
%
Truck
VMT
(miles) LOS
Average Speed
During Peak
Travel (mph)
Average Speed
During OffPeak Travel
(mph)
Total Truck
No Build
Year 2023
Barton Road
between S. La
Cadena Drive &
Grand Terrace Road
14,986 1,354 9.0 4,720 F 25 35
No Build
Year 2045
Barton Road
between S. La
Cadena Drive &
Grand Terrace Road
21,401 1,933 9.0 4,964 F 25 35
Source: Traffic Study Report (KOA 2020).
ADT = average daily traffic
LOS = level of service
mph = miles per hour
VMT = vehicle miles traveled
1.4.3 Project Build Alternative
The Cities of Colton and Grand Terrace, in cooperation with Caltrans, propose to replace the existing two-lane Barton Road Bridge (which is approximately 175 feet long by 25 feet wide) on Barton Road over an abandoned UPRR single-track railway in Colton and Grand Terrace with a two-lane, at-grade asphalt roadway. Barton Road runs through both Colton and Grand Terrace. Improvements to Barton Road will begin at the east side of the Terrace Avenue intersection in Colton and extend to approximately 100 feet west of the intersection of Grand Terrace Avenue in Grand Terrace. The curbto-curb roadway width of 44 feet widens to approximately 70 feet west of Grand Terrace Avenue to tie into the improvements being made to the Barton Road/I-215 interchange. The total length of the roadway improvements is approximately 1,100 feet. The roadway will accommodate a 6-foot wide sidewalk on the north and south sides of Barton Road, an 8-foot wide striped Class II bicycle lane on each side of the roadway, and two 14-foot wide travel lanes. Lane configurations transition to join existing improvements west of Grand Terrace Avenue.
Improvements include the following:
Demolition and removal of the existing bridge, abutments, and retaining walls on Barton Road. Removal and reconstruction of the drainage outlet west of Grand Terrace Avenue. Construction of a drainage culvert across Barton Road in the vicinity of the abandoned tracks. Relocation of the Riverside Highland Water Company line, the City of Colton waterline, fiber optic cables, and a gas line in the existing bridge and roadway and relocation of overhead telephone lines along the north side of Barton Road.
7.c
Packet Pg. 537 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
11 Removal of approximately 5,500 cubic yards (cy) of soil, and fill of approximately 4,300 cy to bring the bridge area to grade.
Construction of an asphalt roadway and removal of the vertical crest curve, thereby improving stopping sight distance consistent with the Cities’ standards for Barton Road’s roadway classification.
Construction of curb ramps to Americans with Disabilities Act (ADA) standards at the intersection of Barton Road and Terrace Avenue.
Construction of 6-foot wide sidewalks and 8-foot wide Class II bike lanes on the north and south sides of Barton Road within the project limits.
Construction of driveway approaches joining existing driveways in compliance with Grand Terrace and Colton City standards.
Removal of a retaining wall along the north side of the Barton Road right-of-way in front of Lineage Logistics.
Identification and provision of a construction staging area in the vicinity of the improvements. Closure of Barton Road between Terrace Avenue and Grand Terrace Avenue during construction and provision of a detour for traffic.
The Project will require approximately 0.20 acre of temporary construction easements and slope easements. The majority of improvements, with the exception of driveway grading to match the lowered street elevation, will be contained to within the Cities’ existing right-of-way. Approximately 3,800 square feet will be acquired to increase the right-of-way at the location of the existing bridge to 50 feet in each direction. A sliver of permanent right-of-way (approximately 50 square feet) will be acquired in front of Assessor’s Parcel Number (APN) 027-522-316. Previously referenced Figure 1-1 provides the regional and project location map. Previously referenced Figure 1-2 shows the project features.
The Traffic Study Report prepared by KOA Corporation (2020) provided the existing traffic volume data, which serve as a baseline by which the future traffic volume projections are determined. Table 1-3 summarizes the average annual daily traffic (ADT) volumes, truck percentage, levels of service, and average speeds along Barton Road at existing year (2019).
7.c
Packet Pg. 538 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
12 Table 1-3. Summary of Build Alternative Traffic Conditions Scenario/
Analysis
Year
Location
ADT
%
Truck
VMT
(miles) LOS
Average
Speed During
Peak Travel
(mph)
Average Speed
During OffPeak Travel
(mph)
Total Truck
Build
Alternative
2023
Barton Road
between S. La
Cadena Drive &
Grand Terrace Road
14,986 1,350 9.0 4,720 D 30 35
Build
Alternative
2045
Barton Road
between S. La
Cadena Drive &
Grand Terrace Road
21,401 1,770 9.0 4,964 F 25 35
Source: Traffic Study Report (KOA 2020).
ADT = average daily traffic
LOS = level of service
mph = miles per hour
VMT = vehicle miles traveled
1.4.4 Comparison of Existing/Baseline and Build Alternatives CEQA requires that the proposed Project emissions be compared to existing/baseline conditions. The Project would not affect regional traffic demand or distribution, and traffic volumes along the Project roadways are expected to remain the same between Build and No Build Alternatives for both the Opening Year (2023) and the Horizon Year (2045).
The Traffic Study Report prepared for the proposed Project concluded that the proposed Project would improve traffic flow along Barton Road at opening year (2023) and Horizon Year (2045). While volumes are expected to increase from the existing year to future years, this is attributed to regional population growth and other factors external to the operation of the proposed Project.
NEPA requires that the proposed Project emissions be compared to no-build conditions for the Opening and Horizon Years. The proposed Project would improve operations on Barton Road, it would not affect regional traffic demand or distribution, and traffic volumes along the Project roadways are expected to remain the same between Build and No Build Alternatives for both the Opening Year (2023) and the Horizon Year (2045). The Traffic Study Report concluded that the proposed Project would improve traffic flow along Barton Road at Opening Year (2023) and Horizon Year (2045).
Table 1-4 summarizes design features and operational impacts on traffic conditions near the Project Area.
7.c
Packet Pg. 539 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
13 Table 1-4. Summary of Long-Term Operational Impacts on Traffic Conditions of Existing, No Build, and Build Alternatives
Scenario/
Analysis Year ADT Volume-to-Capacity Ratio/LOS
Design Features and Operational Impacts on
Traffic Conditions
Existing Baseline
Conditions 2019 7,292 0.41/B
The existing structure has two narrow lanes with no
median. It is designated as unsuitable and is high
priority for replacement. The bridge currently operates with an LOS of B with a volume-to-capacity ratio of
0.41. No-Build Year 2023 14,986 >0.80/D
The baseline condition of the bridge would be
expected to worsen with the No Build Alternative
under operations with projected growth. The bridge
LOS would rate a D with a volume-to-capacity ratio of
greater than 0.80.
Project Opening Year
2023 14,986 0.83/D
Design features and traffic operations would be most
efficient with the Project on opening day. The road’s
LOS would be a D with the best volume-to-capacity
ratio of 0.83 on opening day, allowing improved LOS
on nearby intersections.
No Build Year 2045 21,401 >1.00/F
The baseline condition of the bridge would be
expected to further worsen with projected growth. The
No Build Alternative would not meet future traffic
demands. The bridge LOS would drop to an F with a
volume-to-capacity ratio of greater than 1.00.
Project Horizon Year
2045 21,401 1.19/F
Traffic operations would be most efficient with the
Project for future traffic demands. Although the road’s LOS would be F, this alternative would provide the
best volume-to-capacity ratio with 1.19, when
compared to the other alternatives.
Source: Traffic Study Report (KOA February 2020)
ADT = Average Daily Traffic
LOS = Level of Service
1.5 Construction Activities and Schedule
During implementation of the Barton Road Bridge Removal and Road Construction, traffic will be detoured around the proposed Project area. The Barton Road Bridge will be closed to through traffic for the duration of the 14-month proposed Project. From the east, traffic will be diverted through S.
La Crosse Avenue, west on De Berry Street, and north on S. Terrace Road before reconnection to Barton Road west of the proposed Project area. From the west, cars will be directed south on S.
Terrace Avenue, east on De Berry Street, and north on La Crosse Avenue before reconnection with Barton Road.
During construction, pedestrians and bicycles would be detoured around the proposed Project site from both directions through the same routes as vehicles diverted. The public transportation bus system is run by OmniTrans, the primary transit agency in the San Bernardino Valley (OmniTrans 2020). The bus line does not use the existing route over Barton Road in the proposed Project area.
Therefore, there will not be disruptions to public transit for the duration of the Project.
7.c
Packet Pg. 540 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
1. Proposed Project Description
14 Construction of the proposed Project would require the closure of Barton Road, which would result in removing several driveways to operational businesses. These businesses will have access to Barton Road, east of the bridge removal, without impacts from continued operation.
The construction equipment and staging for the contractor will be in located north of Barton Road, east of the former track alignment. The location will serve as base of operations for daily activity on the Project site. The removal of the bridge will generate a large number of truck trips for haul away of material and asphalt. The site map provided in Figure 1-2, shows the proposed Project construction boundaries and staging areas.
Construction equipment would enter the Project site from the west side of the proposed Project area on Barton Road, arriving from the designated detour around the Project site from I-215 or from S. La Cadena Drive. The other possible approach is the east side of the proposed Project site on Barton Road, onto the east side of the Barton Road Bridge for the process of removal or grading.
Construction is planned to last approximately 14 months. The proposed Project would be operational in 2023 and the full buildout year is 2045. Emissions from construction-related activities are thus considered temporary as defined in 40 Code of Federal Regulations (CFR) 93.123(c)(5); and are not required to be included in particulate matter (PM) hot-spot analyses to meet conformity requirements.
7.c
Packet Pg. 541 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
15 2. Regulatory Setting
Many statutes, regulations, plans, and policies have been adopted at the federal, State, and local levels to address air quality issues related to transportation and other sources. The proposed Project is subject to air quality regulations at each of these levels. This section introduces the pollutants governed by these regulations and describes the regulation and policies that are relevant to the proposed Project.
2.1 Pollutant-Specific Overview
Air pollutants are governed by multiple federal and State standards to regulate and mitigate health impacts. At the federal level, there are six criteria pollutants for which National Ambient Air Quality Standards (NAAQS) have been established: carbon monoxide (CO), nitrogen dioxide (NO2), ozone (O3), particulate matter (particulate matter less than 10 microns in diameter [PM10] and particulate matter less than 2.5 microns in diameter [PM2.5]), and in some areas (although not in California), sulfur dioxide (SO2). The United States Environmental Protection Agency (U.S. EPA) has also identified nine priority mobile source air toxics (MSAT): 1,3-butadiene, acetaldehyde, acrolein, benzene, diesel particulate matter (diesel PM), ethylbenzene, formaldehyde, naphthalene, and polycyclic organic matter. In California, sulfates, visibility-reducing particles, hydrogen sulfide, and vinyl chloride are also regulated.
2.1.1 Criteria Pollutants
The Federal Clean Air Act (FCAA) requires the U.S. EPA to set NAAQS for six criteria air contaminants:
ozone, particulate matter, carbon monoxide, nitrogen dioxide, lead, and sulfur dioxide. It also permits states to adopt additional or more protective air quality standards if needed. California has set standards for certain pollutants. Table 2-1 documents the current air quality standards, while Table 2-2 summarizes the sources and health effects of the six criteria pollutants and pollutants regulated in California.
2.1.2 Mobile Source Air Toxics
Controlling air toxic emissions became a national priority with the passage of the Clean Air Act Amendments (CAAA) of 1990, whereby Congress mandated that the U.S. EPA regulate 188 air toxics, also known as hazardous air pollutants. The U.S. EPA has assessed this expansive list in its rule on the Control of Hazardous Air Pollutants from Mobile Sources (Federal Register, Vol. 72, No. 37, page 8430, February 26, 2007), and identified a group of 93 compounds emitted from mobile sources that are part of U.S. EPA’s Integrated Risk Information System (https://www.epa.gov/iris). In addition, the U.S. EPA identified nine compounds with significant contributions from mobile sources that are among the national and regional-scale cancer risk drivers or contributors and non-hazard contributors from the 2011 National Air Toxics Assessment (https://www.epa.gov/national-air-toxicsassessment). These are 1,3-butadiene, acetaldehyde, acrolein, benzene, diesel particulate matter
7.c
Packet Pg. 542 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
16 Table 2-1. State and Federal Criteria Air Pollutant Standards and Status for San Bernardino County – South Coast Air Basin
Pollutant Averaging
Time
State Standard A
Federal
Standard B
State Project
Attainment Status
Federal Project Area
Attainment Status
O3 C 1 hour 0.09 ppm D N/A Nonattainment N/A
O3 8 hours 0.070 ppm
0.070 ppm
(4th highest in
3 years)
Nonattainment Extreme Nonattainment
CO E 1 hour 20 ppm 35 ppm Attainment Attainment/Maintenance CO 8 hours 9.0 ppm 9 ppm Attainment Attainment/Maintenance CO
8 hours
(Lake
Tahoe)
6 ppm N/A N/A N/A
PM10 F 24 hours 50 μg/m3 G
150 μg/m3
(expected
number of
days above
standard < or
equal to 1)
Nonattainment Attainment/Maintenance
PM10 Annual 20 μg/m3 N/A Nonattainment N/A
PM2.5 H 24 hours N/A 35 μg/m3 N/A Moderate Nonattainment PM2.5 Annual 12 μg/m3 12.0 μg/m3 Nonattainment Moderate Nonattainment NO2 1 hour 0.18 ppm 0.100 ppm I Attainment Attainment/Maintenance NO2 Annual 0.030 ppm 0.053 ppm Attainment Attainment/Maintenance SO2 J 1 hour 0.25 ppm
0.075 ppm
(99th
percentile
over 3 years)
Attainment/Unclassified Attainment/Maintenance
SO2 3 hours N/A 0.5 ppm K N/A Attainment/Maintenance
SO2 24 hours 0.04 ppm 0.14 ppm (for
certain areas) Attainment/Unclassified Attainment/Maintenance SO2 Annual N/A
0.030 ppm
(for certain
areas)
N/A Attainment/Maintenance
Pb L Monthly 1.5 μg/m3 N/A Attainment/Unclassified N/A
Pb Calendar
Quarter N/A
1.5 μg/m3
(for certain
areas)
N/A Attainment/Maintenance
Pb
Rolling 3-
month
average
N/A 0.15 μg/m3 N/A Attainment/Maintenance
Sulfates 24 hours 25 μg/m3 N/A Attainment/Unclassified N/A H2S 1 hour 0.03 ppm N/A Attainment/Unclassified N/A
Visibility
Reducing
Particles
(VRP) M
8 hours
Visibility of 10
miles or more
(Tahoe: 30
miles) at relative
humidity less
than 70 %
N/A Attainment/Unclassified N/A
Vinyl
Chloride N 24 hours 0.01 ppm N/A Attainment/Unclassified N/A Adapted from the California ARB Air Quality Standards chart (May 4, 2016)
7.c
Packet Pg. 543 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
17 A California standards for ozone, carbon monoxide (except 8-hour Lake Tahoe), sulfur dioxide (1 and 24 hour), nitrogen dioxide, and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations.
B
Federal standards (other than ozone, particulate matter, and those based on annual arithmetic mean) are not to be exceeded more than once a year. The ozone standard is attained when the fourth highest 8-hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24-hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 μg/m3 is equal to or less than one.
For PM2.5, the 24-hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard. Contact the U.S. EPA for further clarification and current national policies.
C On October 1, 2015, the national 8-hour ozone primary and secondary standards were lowered from 0.075 to 0.070 ppm.
Transportation conformity applies in newly designated nonattainment areas for the 2015 national 8-hour ozone primary and secondary standards on and after August 4, 2019 (see Transportation Conformity Guidance for 2015 Ozone NAAQS Nonattainment Areas).
D ppm = parts per million
E
Transportation conformity requirements for CO no longer apply after June 1, 2018 for the following California Carbon Monoxide Maintenance Areas (see U.S. EPA CO Maintenance Letter).
F
On December 14, 2012, the national annual PM2.5 primary standard was lowered from 15 μg/m3 to 12 μg/m3. The existing national 24-hour PM2.5 standards (primary and secondary) were retained at 35 μg/m3 , as was the annual secondary standard of
15 μg/m3
. The existing 24-hour PM10 standards (primary and secondary) of 150 μg/m3 also were retained. The form of the annual primary and secondary standards is the annual mean, averaged over 3 years.
G μg/m3
= micrograms per cubic meter
H The 65 μg/m3
PM2.5 (24-hr) NAAQS was not revoked when the 35 μg/m3 NAAQS was promulgated in 2006. The 15 μg/m3 annual PM2.5 standard was not revoked when the 12 μg/m3 standard was promulgated in 2012. Therefore, for areas designated nonattainment or nonattainment/maintenance for the 1997 and or 2006 PM2.5 NAAQS, conformity requirements still apply until the NAAQS are fully revoked.
I
Final 1-hour NO2 NAAQS published in the Federal Register on February 9, 2010, effective March 9, 2010. Initial area designation for California (2012) was attainment/unclassifiable throughout. Project-level hot spot analysis requirements do not currently exist. Near-road monitoring starting in 2013 may cause re-designation to nonattainment in some areas after 2016.
J
On June 2, 2010, a new 1-hour SO2 standard was established and the existing 24-hour and annual primary standards were revoked. To attain the 1-hour national standard, the 3-year average of the annual 99th percentile of the 1-hour daily maximum concentrations at each site must not exceed 75 ppb. The 1971 SO2 national standards (24-hour and annual) remain in effect until one year after an area is designated for the 2010 standard, except that in areas designated nonattainment for the 1971 standards, the 1971 standards remain in effect until implementation plans to attain or maintain the 2010 standards are approved.
K
Secondary standard, the levels of air quality necessary to protect the public welfare from any known or anticipated adverse effects of a pollutant rather than health. Conformity and environmental analysis address both primary and secondary NAAQS.
L
Lead NAAQS are not considered in Transportation Conformity analysis.
M In 1989, the ARB converted both the general statewide 10-mile visibility standard and the Lake Tahoe 30-mile visibility standard to instrumental equivalents, which are "extinction of 0.23 per kilometer" and "extinction of 0.07 per kilometer" for the statewide and Lake Tahoe Air Basin standards, respectively.
N The ARB has identified vinyl chloride and the particulate matter fraction of diesel exhaust as toxic air contaminants. Diesel exhaust particulate matter is part of PM10 and, in larger proportion, PM2.5. Both the ARB and U.S. EPA have identified lead and various organic compounds that are precursors to ozone and PM2.5 as toxic air contaminants. There are no exposure criteria for adverse health effect due to toxic air contaminants, and control requirements may apply at ambient concentrations below any criteria levels specified above for these pollutants or the general categories of pollutants to which they belong.
7.c
Packet Pg. 544 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
18 Table 2-2. Air Pollutant Effects and Sources
Pollutant Principal Health and Atmospheric Effects Typical Sources Ozone (O3) High concentrations irritate lungs. Long-term exposure may cause lung tissue damage and cancer. Long-term
exposure damages plant materials and reduces crop
productivity. Precursor organic compounds include
many known toxic air contaminants. Biogenic VOC may
also contribute.
Low-altitude ozone is almost entirely formed from
reactive organic gases/volatile organic compounds
(ROG or VOC) and nitrogen oxides (NOx) in the
presence of sunlight and heat. Common precursor
emitters include motor vehicles and other internal
combustion engines, solvent evaporation, boilers,
furnaces, and industrial processes.
Carbon
Monoxide
(CO)
CO interferes with the transfer of oxygen to the blood
and deprives sensitive tissues of oxygen. CO also is a
minor precursor for photochemical ozone. Colorless,
odorless.
Combustion sources, especially gasoline-powered
engines and motor vehicles. CO is the traditional
signature pollutant for on-road mobile sources at
the local and neighborhood scale.
Respirable
Particulate
Matter (PM10)
Irritates eyes and respiratory tract. Decreases lung
capacity. Associated with increased cancer and
mortality. Contributes to haze and reduced visibility.
Includes some toxic air contaminants. Many toxic and
other aerosol and solid compounds are part of PM10.
Dust- and fume-producing industrial and agricultural
operations; combustion smoke & vehicle exhaust;
atmospheric chemical reactions; construction and
other dust-producing activities; unpaved road dust
and re-entrained paved road dust; natural sources.
Fine
Particulate
Matter (PM2.5)
Increases respiratory disease, lung damage, cancer, and premature death. Reduces visibility and produces
surface soiling. Most diesel exhaust particulate matter – a toxic air contaminant – is in the PM2.5 size range.
Many toxic and other aerosol and solid compounds are
part of PM2.5.
Combustion including motor vehicles, other mobile
sources, and industrial activities; residential and
agricultural burning; also formed through
atmospheric chemical and photochemical reactions
involving other pollutants including NOx, sulfur
oxides (SOx), ammonia, and ROG.
Nitrogen
Dioxide (NO2)
Irritating to eyes and respiratory tract. Colors
atmosphere reddish-brown. Contributes to acid rain &
nitrate contamination of storm water. Part of the “NOx” group of ozone precursors.
Motor vehicles and other mobile or portable
engines, especially diesel; refineries; industrial
operations.
Sulfur Dioxide
(SO2)
Irritates respiratory tract; injures lung tissue. Can yellow plant leaves. Destructive to marble, iron, steel.
Contributes to acid rain. Limits visibility.
Fuel combustion (especially coal and high-sulfur oil),
chemical plants, sulfur recovery plants, metal
processing; some natural sources like active
volcanoes. Limited contribution possible from heavyduty diesel vehicles if ultra-low sulfur fuel not used.
Lead (Pb) Disturbs gastrointestinal system. Causes anemia, kidney disease, and neuromuscular and neurological
dysfunction. Also a toxic air contaminant and water
pollutant.
Lead-based industrial processes like battery
production and smelters. Lead paint, leaded
gasoline. Aerially deposited lead from older gasoline
use may exist in soils along major roads.
Sulfate Premature mortality and respiratory effects.
Contributes to acid rain. Some toxic air contaminants
attach to sulfate aerosol particles.
Industrial processes, refineries and oil fields, mines, natural sources like volcanic areas, salt-covered dry
lakes, and large sulfide rock areas.
Hydrogen
Sulfide (H2S)
Colorless, flammable, poisonous. Respiratory irritant.
Neurological damage and premature death. Headache,
nausea. Strong odor.
Industrial processes such as: refineries and oil fields, asphalt plants, livestock operations, sewage
treatment plants, and mines. Some natural sources
like volcanic areas and hot springs.
VisibilityReducing
Particles (VRP)
Reduces visibility. Produces haze. NOTE: not directly
related to the Regional Haze program under the
Federal Clean Air Act, which is oriented primarily
toward visibility issues in National Parks and other
“Class I” areas. However, some issues and measurement
methods are similar.
See particulate matter above. May be related more
to aerosols than to solid particles.
Vinyl Chloride Neurological effects, liver damage, cancer.
Also considered a toxic air contaminant.
Industrial processes.
Source: Caltrans Standard Environmental Reference (Accessed September 2020).
Caltrans = California Department Of Transportation
NOx = Nitrogen Oxide
SOx = Sulfur Oxides
ROG = Reactive Organic Gases
VOC = Volatile Organic Compounds
7.c
Packet Pg. 545 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
19 (diesel PM), ethylbenzene, formaldehyde, naphthalene, and polycyclic organic matter. While the FHWA considers these the priority mobile source air toxics, the list is subject to change and may be adjusted in consideration of future U.S. EPA rules.
The 2007 U.S. EPA rule mentioned above requires controls that will dramatically decrease MSAT emissions through cleaner fuels and cleaner engines. According to an FHWA analysis using U.S. EPA's MOVES 2014a model, even if vehicle activity (vehicle-miles traveled, VMT) increases by 45 percent from 2010 to 2050 as forecast, a combined reduction of 91 percent in the total annual emission rate for the priority MSATs is projected for the same time period, as shown in Figure 2-1.
Source: Federal Highway Administration. Website: https://www.fhwa.dot.gov/ environMent/air_quality/air_toxics/policy_and_guidance/msat/ Figure 2-1. Projected National MSAT Trends, 2010–2050
7.c
Packet Pg. 546 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
20 2.1.3 Greenhouse Gases
The term greenhouse gas (GHG) is used to describe atmospheric gases that absorb solar radiation and subsequently emit radiation in the thermal infrared region of the energy spectrum, trapping heat in the Earth’s atmosphere. These gases include carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), and water vapor, among others. A growing body of research attributes long-term changes in temperature, precipitation, and other elements of Earth’s climate to large increases in GHG emissions since the mid-19th century, particularly from human activity related to fossil fuel combustion.
Anthropogenic GHG emissions of particular interest include CO2, CH4, N2O, and fluorinated gases.
GHGs differ in how much heat each traps in the atmosphere (global warming potential, or GWP). CO2 is the most important GHG, so amounts of other gases are expressed relative to CO2, using a metric called “carbon dioxide equivalent” (CO2e). The global warming potential of CO2 is assigned a value of 1, and the warming potential of other gases is assessed as multiples of CO2. For example, the 2007 International Panel on Climate Change Fourth Assessment Report calculates the GWP of CH4 as 25 and the GWP of N2O as 298 over a 100-year time horizon.1 Generally, estimates of all GHGs are summed to obtain total emissions for a project or given time period, usually expressed in metric tons (MTCO2e), or million metric tons (MMTCO2e).2
As evidence has mounted for the relationship of climate changes to rising GHGs, federal and state governments have established numerous policies and goals targeted to improving energy efficiency and fuel economy, and reducing GHG emissions. Nationally, electricity generation is the largest source of GHG emissions, followed by transportation. In California, however, transportation is the largest contributor to GHGs.
At the federal level, NEPA (42 United States Code [USC] Part 4332) requires federal agencies to assess the environmental effects of their proposed actions prior to making a decision on the action or project.
To date, no national standards have been established for nationwide mobile-source GHG reduction targets, nor have any regulations or legislation been enacted specifically to address climate change and GHG emissions reduction at the project level. However, the U.S. EPA and the National Highway Traffic Safety Administration issued the first corporate fuel economy standards in 2010, requiring cars and light-duty vehicles to achieve certain fuel economy targets by 2016, with the intention of gradually increasing the targets and the range of vehicles to which they would apply.
California has enacted aggressive GHG reduction targets, starting with Assembly Bill (AB) 32, the California Global Warming Solutions Act of 2006. AB 32 is California’s signature climate change legislation. It set the goal of reducing statewide GHG emissions to 1990 levels by 2020, and required the California Air Resources Board (CARB) to develop a Scoping Plan that describes the approach
1 See Table 2.14 in IPCC Fourth Assessment Report: Climate Change 2007 (AR4): The Physical Science Basis. Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change [Solomon, S., D. Qin, M. Manning, Z. Chen, M. Marquis, K.B. Averyt, M. Tignor and H.L. Miller, eds.]. New York and Cambridge, United Kingdom:
Cambridge University Press, Website: www.ipcc.ch/pdf/assessment-report/ar4/wg1/ar4-wg1-chapter2.pdf (accessed April 2018). 2 See http://www.airquality.org/Businesses/CEQA-Land-Use-Planning/CEQA-Guidance-Tools.
7.c
Packet Pg. 547 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
21 California will take to achieve that goal and to update it every 5 years. In 2015, Governor Jerry Brown enhanced the overall adaptation planning effort with Executive Order (EO) B-30-15, establishing an interim GHG reduction goal of 40 percent below 1990 levels by 2030, and requiring State agencies to factor climate change into all planning and investment decisions.
Senate Bill (SB) 375, the Sustainable Communities and Climate Protection Act of 2008, furthered State climate action goals by mandating coordinated transportation and land use planning through the preparation of Sustainable Communities Strategies (SCSs). The CARB sets GHG emissions reduction targets for passenger vehicles for each region. Each regional metropolitan planning organization must include in its regional transportation plan an SCS proposing action toward achieving the regional emission reduction targets.3
With these and other State Senate and Assembly bills and executive orders, California advances an innovative and proactive approach to dealing with GHG emissions and climate change.
2.1.4 Asbestos
Asbestos is a term used for several types of naturally occurring fibrous minerals that are a human health hazard when airborne. The most common type of asbestos is chrysotile, but other types such as tremolite and actinolite are also found in California. Asbestos is classified as a known human carcinogen by state, federal, and international agencies and was identified as a toxic air contaminant by CARB in 1986. All types of asbestos are hazardous and may cause lung disease and cancer.
Asbestos can be released from serpentine and ultramafic rocks when the rock is broken or crushed.
At the point of release, the asbestos fibers may become airborne, causing air quality and human health hazards. These rocks have been commonly used for unpaved gravel roads, landscaping, fill projects, and other improvement projects in some localities. Asbestos may be released to the atmosphere due to vehicular traffic on unpaved roads, during grading for development projects, and at quarry operations. All of these activities may have the effect of releasing potentially harmful asbestos into the air. Natural weathering and erosion processes can act on asbestos-bearing rock and make it easier for asbestos fibers to become airborne if such rock is disturbed.
Serpentine may contain chrysotile asbestos, especially near fault zones. Ultramafic rock, a rock closely related to serpentinite, may also contain asbestos minerals. Asbestos can also be associated with other rock types in California, though much less frequently than serpentinite and/or ultramafic rock. Serpentinite and/or ultramafic rock are known to be present in 44 of California’s 58 counties.
These rocks are particularly abundant in counties of the Sierra Nevada foothills, the Klamath Mountains, and Coast Ranges. The California Department of Conservation, Division of Mines and Geology has developed a map showing the general location of ultramafic rock in the state (www.conservation.ca.gov/cgs/minerals/hazardous_minerals/asbestos/Pages/index.aspx).
3 California Air Resources Board. Sustainable Communities. Website: https://www.arb.ca.gov/cc/sb375/sb375.htm.
7.c
Packet Pg. 548 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
22 2.2 Regulations
2.2.1 Federal and California Clean Air Acts
The FCAA, as amended, is the primary federal law that governs air quality while the California Clean Air Act (CCAA) is its companion State law. These laws and related regulations by the U.S. EPA and CARB set standards for the concentration of pollutants in the air. At the federal level, these standards are called NAAQS. NAAQS and State ambient air quality standards have been established for six transportation-related criteria pollutants that have been linked to potential health concerns: CO; NO2; O3; PM, which is broken down for regulatory purposes into PM10 and PM2.5; and SO2. In addition, national and state standards exist for lead (Pb), and state standards exist for visibility reducing particles, sulfates, hydrogen sulfide (H2S), and vinyl chloride. The NAAQS and State standards are set at levels that protect public health with a margin of safety, and are subject to periodic review and revision. Both State and federal regulatory schemes also cover Toxic Air Contaminants (TACs); some criteria pollutants are also TACs, or may include certain TACs in their general definitions.
2.2.2 Transportation Conformity
The conformity requirement is based on FCAA Section 176(c), which prohibits the U.S. Department of Transportation (USDOT) and other federal agencies from funding, authorizing, or approving plans, programs, or projects that do not conform to the State Implementation Plan (SIP) for attaining the NAAQS. “Transportation Conformity” applies to highway and transit projects and takes place on two levels: the regional—or, planning and programming level—and the project level. The proposed project must conform at both levels to be approved.
Conformity requirements apply only in nonattainment and “maintenance” (former nonattainment) areas for the NAAQS, and only for the specific NAAQS that are or were violated. The U.S. EPA regulations at 40 CFR 93 govern the conformity process. Conformity requirements do not apply in unclassifiable/attainment areas for NAAQS and do not apply at all for state standards regardless of the status of the area.
Regional conformity is concerned with how well the regional transportation system supports plans for attaining the NAAQS for CO, NO2, O3, PM10, PM2.5, and in some areas (although not in California), SO2. California has attainment or maintenance areas for all of these transportation-related “criteria pollutants” except SO2, and also has a nonattainment area for Pb; however, Pb is not currently required by the FCAA to be covered in transportation conformity analysis. Regional conformity is based on emission analysis of RTPs and FTIPs that include all transportation projects planned for a region over a period of at least 20 years (for the RTP), and 4 years (for the FTIP). RTP and FTIP conformity uses travel demand and emission models to determine whether or not the implementation of those projects would conform to emission budgets or other tests at various analysis years showing that requirements of the FCAA and the SIP are met. If the conformity analysis is successful, the Metropolitan Planning Organization, the FHWA, and the FTA make the determinations that the RTP and FTIP are in conformity with the SIP for achieving the goals of the
7.c
Packet Pg. 549 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
23 FCAA. Otherwise, the projects in the RTP and/or FTIP must be modified until conformity is attained. If the design concept, scope, and “open-to-traffic” schedule of a proposed transportation project are the same as described in the RTP and the FTIP, then the proposed project meets regional conformity requirements for purposes of project-level analysis.
Project-level conformity is achieved by demonstrating that the project comes from a conforming RTP and FTIP and the project has a design concept and scope4 that has not changed significantly from those in the RTP and FTIP. If the design concept and scope have changed substantially from that used in the RTP Conformity analysis, RTP and FTIP amendments may be needed. Project-level conformity also needs to demonstrate that project analyses have used the latest planning assumptions and U.S. EPA-approved emissions models; the project complies with any control measures in the SIP in PM areas. Furthermore, additional analyses (known as hot-spot analyses) may be required for projects located in CO and PM nonattainment or maintenance areas to examine localized air quality impacts.
2.2.3 National Environmental Policy Act
NEPA requires that policies and regulations administered by the federal government be consistent with its environmental protection goals. NEPA also requires that federal agencies use an interdisciplinary approach to planning and decision-making for any actions that could affect the environment. It requires environmental review of federal actions including the creation of environmental documents that describe the environmental effects of a proposed project and its alternatives (including a section on air quality impacts).
2.2.4 California Environmental Quality Act
CEQA5 is a statute that requires State and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible. CEQA documents address CCAA requirements for transportation projects. Although State standards are often stricter than federal standards, the State has no conformity process.
2.2.5 Local
The U.S. EPA has delegated responsibility to air districts to establish local rules to protect air quality.
Caltrans’ Standard Specification 14-9.02 (Caltrans 2015) requires compliance with all applicable air quality laws and regulations including local and air district ordinances and rules.
SCAQMD and the SCAG are responsible for formulating and implementing the Air Quality Management Plan (AQMP) for the South Coast Air Basin. The main purpose of an AQMP is to bring
4 "Design concept" means the type of facility that is proposed, such as a freeway or arterial highway. "Design scope" refers to those aspects of the project that would clearly affect capacity and thus any regional emissions analysis, such as the number of lanes and the length of the project. 5
For general information about CEQA, see: http://resources.ca.gov/ceqa/more/faq.html.
7.c
Packet Pg. 550 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
2. Regulatory Setting
24 the area into compliance with federal and State air quality standards. Every three years, SCAQMD prepares a new AQMP, updating the previous plan and 20-year horizon (SCAQMD 2016).
SCAQMD approved the 2016 AQMP on March 3, 2017, and submitted the plan to CARB on March 10, 2017. Key elements of the 2016 AQMP include the following:
Calculating and taking credit for co-benefits from other planning efforts (e.g., climate, energy, and transportation).
A strategy with fair-share emission reductions at the federal, State, and local levels. Investment in strategies and technologies meeting multiple air quality objectives. Seeking new partnerships and significant funding for incentives to accelerate deployment of zero-emission and near-zero emission technologies.
Enhanced socioeconomic assessment, including an expanded environmental justice analysis. Attainment of the 24-hour PM2.5 standard in 2019 with no additional measures. Attainment of the annual PM2.5 standard by 2025 with implementation of a portion of the O3 strategy.
Attainment of the 1-hour O3 standard by 2022 with no reliance on “black box” future technology (FCAA Section 182(e)(5) measures).
SCAG is responsible under the FCAA for determining the conformity of projects, plans, and programs with the SCAQMD AQMP. As indicated in the SCAQMD CEQA Air Quality Handbook (1993), there are two main indicators of consistency:
Whether the project would result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations, or delay timely attainment of air quality standards or the interim emission reductions specified in the AQMP; and Whether the project would exceed the AQMP’s assumptions for 2020 or increments based on the year of project buildout and phase.
7.c
Packet Pg. 551 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
25 3. Affected Environment
The topography of a region can substantially affect airflow and resulting pollutant concentrations.
California is divided into 15 air basins with similar topography and meteorology to better manage air quality throughout the State. Each air basin has a local air district that is responsible for identifying and implementing air quality strategies to comply with ambient air quality standards.
The Barton Road Bridge Removal and Road Construction Project is on the boundary of the City of Colton and the City of Grand Terrace, in San Bernardino County, an area within the South Coast Air Basin, which also includes non-desert portions of Los Angeles County and the western portions of San Bernardino and Riverside Counties. The SCAQMD administers air quality regulation in the South Coast Air Basin. Current population for San Bernardino County is 2.18 million (U.S. Census 2019). San Bernardino County’s economy is largely driven by retail trade, healthcare, manufacturing, transport/warehouse, and accommodation/food (San Bernardino County Economic Development Agency 2020).
3.1 Climate, Meteorology, and Topography
Meteorology (weather) and terrain can influence air quality. Certain weather parameters are highly correlated to air quality, including temperature, the amount of sunlight, and the type of winds at the surface and above the surface. Winds can transport ozone and ozone precursors from one region to another, contributing to air quality problems downwind of source regions. Furthermore, mountains can act as a barrier that prevents ozone from dispersing.
The San Bernardino climatological station, maintained by SCAQMD, is located near the Project site and is representative of meteorological conditions near the proposed Project. Figure 3-1 shows a wind rose illustrating the predominant wind patterns near the proposed Project. The climate of the Project Area is generally Mediterranean in character, with cool winters (lows average 42.1° Fahrenheit [°F] in January) and warm, dry summers (average 97.3 °F in August).6 Temperature inversions are common, affecting localized pollutant concentrations in the winter and enhancing ozone formation in the summer. The San Gabriel Mountains, ranging to 10,000 feet in altitude (U.S. Forest Service 2015), tend to trap pollutants in the region by limiting airflow. Annual average rainfall is 16.01 inches (at San Bernardino County Yard SBYC1), mainly falling during the winter months.
6 Data from Western Regional Climate Center. Website:
https://mesonet.agron.iastate.edu/sites/monthlysum.php?station=SBYC1&network=CA_DCP, accessed April 2020.
7.c
Packet Pg. 552 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
26 Figure 3-1. Predominant Wind Patterns at the San Bernardino County Yard at 24302 4th Street Monitoring Station.
3.2 Existing Air Quality
This section summarizes existing air quality conditions near the Project area. It includes attainment statuses for criteria pollutants, describes local ambient concentrations of criteria pollutants for the past five years, and discusses MSAT and GHG emissions.
The SCAQMD operates several air quality monitoring station near the Project area. The San Bernardino Air Quality Monitoring Station is the closest to the proposed Project. Figure 3-2 shows the location of the San Bernardino 24302 4th Street Monitoring Station.
3.2.1 Criteria Pollutants and Attainment Status
Air quality monitoring stations are located throughout the nation and are maintained by local air districts and State air quality regulating agencies. The U.S. EPA uses data collected at permanent monitoring stations to identify regions as “attainment,” “nonattainment,” or “maintenance,” depending on whether the regions meet the requirements stated in the primary NAAQS.
7.c
Packet Pg. 553 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction San Bernardino Monitoring Station
SOURCE Bing, ESRI :
FEET
0 2000 4000
N
FIGURE 3-2
I:\CNS1901\G\Monitoring Station.cdr (10/5/2020)
Barton Road Bridge Removal
and Road Construcon Project
Map of Air Quality Monitoring Staon Located Near the Project BRLS 5056 (024)
Project Site - Barton Road Bridge
7.c
Packet Pg. 554 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
28 This page intentionally left blank
7.c
Packet Pg. 555 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
29 Nonattainment areas are imposed with additional restrictions as required by the U.S. EPA. In addition, different classifications of nonattainment (e.g., marginal, moderate, serious, severe, and extreme) are used to classify each air basin in the State on a pollutant-by-pollutant basis. The classifications are used as a foundation to create air quality management strategies to improve air quality and comply with the NAAQS. Table 3-1 lists the State and federal attainment status for all regulated pollutants.
Table 3-1. State and Federal Attainment Status for the South Coast Air Basin Pollutant State Attainment Status Federal Attainment Status Ozone (O3) Nonattainment (1-hour and 8-hour) Extreme Nonattainment (8-hour) Respirable Particulate Matter (PM10) Nonattainment Attainment/Maintenance Fine Particulate Matter (PM2.5) Nonattainment Moderate Nonattainment Carbon Monoxide (CO) Attainment Attainment/Maintenance
Nitrogen Dioxide (NO2) Attainment Attainment/Maintenance Sulfur Dioxide (SO2) Attainment/Unclassified Attainment/Unclassified Lead (Pb) Nonattainment (Los Angeles County only) Nonattainment (Los Angeles County only) Visibility-Reducing Particles Attainment/Unclassified Not Applicable Sulfates Attainment/Unclassified Not Applicable
Hydrogen Sulfide Attainment/Unclassified Not Applicable Vinyl Chloride Attainment/Unclassified Not Applicable
Source: California Air Resources Board. Air Quality Standards and Area Designations. Website: http://www.arb.ca.gov/desig/desig.htm (accessed September 2020).
The SCAQMD San Bernardino Air Quality Monitoring Station located at San Bernardino at 24302 4th Street, monitors five criteria pollutants (O3, CO, NO2, PM10 and PM2.5). Table 3-2 lists air quality trends identified for data collected at both air quality monitoring stations between 2015 and 2019.
3.2.2 Mobile Source Air Toxics
In addition to the criteria air pollutants for which there are NAAQS, the EPA also regulates air toxics.
Most air toxics originate from human-made sources, including on-road mobile sources, non-road mobile sources (e.g., airplanes), area sources (e.g., dry cleaners), and stationary sources (e.g., factories).
Controlling air toxic emissions became a national priority with the passage of the FCAA Amendments of 1990, whereby Congress mandated that the U.S. EPA regulate 188 air toxics, also known as hazardous air pollutants. The U.S. EPA has assessed this expansive list in its latest rule on the Control of Hazardous Air Pollutants from Mobile Sources (Federal Register, Volume 73, No. 201, page 61,358; October 16, 2008) and identified a group of 93 compounds emitted from mobile sources that are listed in its Integrated Risk Information System. In addition, the U.S. EPA identified nine compounds with significant contributions from mobile sources that are among the national and regional-scale cancer risk drivers from its 2011 National Air Toxics Assessment. These are acrolein, benzene, 1,3- butadiene, acetaldehyde, diesel PM, ethylbenzene, formaldehyde, naphthalene, and polycyclic organic matter. While the FHWA considers these the priority MSAT, the list is subject to change and may be adjusted in consideration of future U.S. EPA rules. Table 3-3 lists the ambient concentrations
7.c
Packet Pg. 556 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
30 Table 3-2. Air Quality Concentrations for the Past Five Years Measured at San Bernardino 4th Street Monitoring Station
Pollutant Standard 2015 2016 2017 2018 2019
Ozone
Max 1-hour concentration (ppm) 0.134 0.158 0.158 0.138 0.127 No. days exceeded: State 0.09 ppm 52 70 81 63 96
Max 8-hour concentration (ppm) 0.118 0.118 0.136 0.116 0.114 No. days exceeded: State
Federal
0.070 ppm
0070 ppm
79 78 108106 114 112
107
102
73 96
Carbon Monoxide
Max 1-hour concentration (ppm) 2.3 2.2 2.5 2.7 1.3
No. days exceeded: State
Federal
20 ppm
35 ppm
0 0
0 0
0 0
0 0
0 0
Max 8-hour concentration (ppm) 1.8 1.7 2.3 2.5 1.1
No. days exceeded: State
Federal
9.0 ppm
9 ppm
0 0
0 0
0 0
0 0
0 0
PM10
Max 24-hour concentration (μg/m3) 187.0 277.0 157.8 130.2 112.0 No. days exceeded: State
Federal
50 μg/m3
150 μg/m3
19.2 7.1
ND
ND
ND
1.1 30.9
0 36.0
0 Max annual concentration (μg/m3) 31.7 ND ND 33.0 29.9 No. days exceeded: State 20 μg/m3 3 ND 14 5 4
PM2.5
Max 24-hour concentration (μg/m3) 53.5 53.5 38.2 30.1 34.8 No. days exceeded: Federal 35 μg/m3 6.9 3.0 3.3 0 0
Max annual concentration (μg/m3) 10.7 32.5 25.6 22.9 10.1 No. days exceeded: State
Federal
12 μg/m3
12 μg/m3
ND
2 ND
1 1
ND
0 ND
0 ND
Nitrogen Dioxide
Max 1-hour concentration (ppb) 71.4 60.1 65.8 57.3 59.3 No. days exceeded: State
Federal
180 ppb
100 ppb
0 0
0 0
0 0
0 0
0 0
Max annual concentration (ppb) 15.2 16.6 15.8 15.8 14.3 No. days exceeded: State
Federal
30 ppb
53 ppb
0 0
0 0
0 0
0 0
0 0
Source: U.S. EPA, Air Quality Data. Website: https://www.epa.gov/outdoor-air-quality-data (accessed September 2020).
ND = No data available or monitored
µg/m3 = micrograms per cubic meter
avg. = average
max = maximum
PM10 = particulate matter less than 10 microns in size
PM2.5 = particulate matter less than 2.5 microns in size ppb = parts per billion
ppm = parts per million
U.S. EPA = United States Environmental Protection Agency Table 3-3. Mobile Source Air Toxics Measured Concentrations in the Project Vicinity MSAT Unit Measured Maximums
2015 2016 2017 2018 2019
Acrolein ppb 1.0 1.3 0.6 2.1 ND
Benzene ppb 0.62 0.82 1.1 1.2 ND
1,3-Butadiene ppb 0.23 0.17 0.14 0.16 ND
Acetaldehyde ppb 2.6 2.7 2.8 ND ND
Ethylbenzene ppb 0.3 0.9 0.5 0.5 ND
Formaldehyde ppb 6.5 7.7 7.4 ND ND
Source: CARB, website: https://www.arb.ca.gov/adam/toxics/toxics.html (accessed September 2020).
Notes: 2015–2018 data from Riverside - Rubidoux Station, 2019 data is not available.
The diesel PM, naphthalene, and polycyclic organic matter MSATs are not monitored.
CARB = California Air Resources Board
MSAT = mobile source air toxics
ND = No data available or monitored
PM = particulate matter
ppb = parts per billion
7.c
Packet Pg. 557 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
31 of the MSATs at the San Bernardino 4th Street Monitoring Station (the closest MSAT monitoring station) in the Project vicinity.
3.2.3 Greenhouse Gas and Climate Change
CO2, as part of the carbon cycle, is an important compound for plant and animal life, but also accounted for 84 percent of California’s total GHG emissions in 2017. Transportation, primarily onroad travel, is the single largest source of CO2 emissions in the State.
The proposed Project is located in San Bernardino County, and is included in the SCAG RTP/SCS and FTIP. The proposed Project appears on the Grouped Projects listing under the Adopted Final 2019 FTIP under the Federal Highway Bridge Program (HBP) ID# 1056. The Final 2019 FTIP HBP was adopted on September 6, 2018, by the SCAG Regional Council, and later updated to the 2019 Grouped Projects Detailed Backup Lists on November 1, 2019. The proposed Project is described in the 2019 FTIP HBP as the removal of Barton Road Bridge (Bridge No. 54C0379) over the previous Union Pacific rail road tracks 0.25 mile west of the I-215. The proposed Project would replace the two-lane bridge with a four-lane asphalt road at grade-level, with associated bicycle lanes. Minor seismic activity contribution would occur during bridge removal. The City of Colton will be the implementing lead agency for design and construction.
3.3 Sensitive Receptors
Existing land uses in the proposed Project area include single-family and multifamily residences, a mobile home park, industrial storage yards, food distribution facilities, commercial uses, vacant land, and a clinical laboratory.
Land uses north of Barton Road and west of the S. La Cadena Drive include single-family residences, a mobile home park, commercial park, and industrial food distribution center.
Land uses south of Barton Road adjacent to the proposed Project area consist of a construction equipment yard, commercial supply companies, a collision center, and office uses.
Land uses east of the proposed Project area include a clinical laboratory, and a mobile home park.
Figure 3-3 presents the locations of the sensitive receptors near the Project area.
3.4 Conformity Status
The Transportation Conformity Rule is based on FCAA Section 176(c), which prohibits the USDOT and other federal agencies from funding, authorizing, or approving plans, programs, or projects that do not conform to the SIP for attaining the NAAQS. Conformity applies to highway and transit projects
7.c
Packet Pg. 558 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
32 This page intentionally left blank
7.c
Packet Pg. 559 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction SOURCE Google Earth :
FEET
0 165 330
N
FIGURE 3-3
I:\CNS1901\G\Sensitive Receptors.cdr (10/5/2020)
Barton Road Bridge Removal
and Road Construcon Project
Sensive Receptors Located Near the Proposed Project
BRLS 5056 (024)
LEGEND
Project SiteResidential Areas
Residential
Barton Rd
Terrace Ave
Grand Terrace Rd La Cadena DR
Palm Ave
215
Residential
Residential
7.c
Packet Pg. 560
Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
3. Affected Environment
34 This page intentionally left blank
7.c
Packet Pg. 561
Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge
3. Affected Environment
35 and takes place on two levels: the regional (or planning and programming) level and the project level. The proposed Project must conform at both levels to be approved.
Conformity requirements apply only in nonattainment and maintenance (former nonattainment) areas for the NAAQS, and only for the specific NAAQS that are or were violated. U.S. EPA regulations at 40 CFR 93 govern the conformity process. Conformity requirements do not apply in unclassifiable/attainment areas for the NAAQS and do not apply at all for State standards regardless of the status of the area.
3.4.1 Regional Conformity
Regional conformity is concerned with how well the regional transportation system supports plans for attaining the NAAQS for CO, NO2, O3, PM10, and PM2.5, and in some areas (although not in California), SO2. California has nonattainment or maintenance areas for all of these transportationrelated “criteria pollutants” except SO2, and also has a nonattainment area for Pb; however, the FCAA does not currently require Pb to be covered in transportation conformity analysis.
As part of the Clean Air Rules of 2004, the U.S. EPA published a final rule in the Federal Register on July 1, 2004, to amend the Transportation Conformity Rule to include criteria and procedures for the new 8-hour O3 and PM2.5 NAAQS. The final rule addressed a March 2, 1999, court decision by incorporating U.S. EPA and USDOT guidance. On July 20, 2004, the EPA published a technical correction notice to correct two minor errors in the July 1, 2004, notice. To remain consistent with the stricter federal standards, CARB approved a new 8-hour O3 standard (0.07 parts per million [ppm], not to be exceeded) on April 28, 2005. Additionally, the CARB retained the current 1-hour-average standard for O3 (0.09 ppm) and the current monitoring method for O3, which uses the ultraviolet photometry method.
Table 2 of 40 CFR, Section 93.126 lists the types of projects that are exempt. The bridge removal and new at-grade level street widening with no additional lanes as part of the Build Alternative is one of the exempt projects listed in Table 2. Therefore, the proposed Project is exempt from all emissions analyses. Projects that are included in Table 3 of 40 CFR, Section 93.127 are exempt from regional conformity. Because the proposed Project would remove the Barton Street Bridge and widen a new at-grade level asphalt road with no additional lanes, it is exempt from regional emissions analysis.
The proposed Project is located in San Bernardino County, located in the 2019 FTIP under the HBP, is consistent with the SCAG’s approved RTP/SCS. The Final 2019 FTIP includes all federally funded transportation projects, the regional plan RTP/SCS was adopted by SCAG on September 6, 2018. The proposed Project appears on the Grouped Projects listing under the Adopted Final 2019 FTIP under the HBP ID No. 1056. The Final 2019 FTIP HBP 1056 was also adopted on September 6, 2018, by the SCAG Regional Council, and updated to the 2019 Grouped Projects Detailed Backup Lists on November 1, 2019 (Appendix A).
7.c
Packet Pg. 562 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
36 The design concept and scope of the proposed Project is consistent with the project description in the 2016 RTP and 2019 FTIP and the “open to traffic” assumptions of the SCAG’s regional emissions analysis. Table 3-4 summarizes conformity status information. Appendix A includes copies of relevant pages from the RTP/SCS and FTIP.
Table 3-4. Status of Plans Related to Regional Conformity MPO Plan/TIP
Date of
Adoption by
MPO
Date of SCAG
Approval
Last
Amendment
Date of FHWA
Approval of Last
Amendment
SCAG Regional Transportation
Plan/Sustainable Communities Strategy April 7, 2016 September 17, 2018 Amendment No. 19–16 December 31, 2019 SCAG Transportation Improvement Program
(FSTIP approval)
September 14,
2016 February 23, 2018 Amendment No. 17–18 March 26, 2018 FHWA = Federal Highway Administration
FSTIP = Federal Statewide Transportation Improvement Program MPO = Metropolitan Planning Organization
SCAG = Southern California Association of Governments
TIP = Transportation Improvement Program
3.4.2 Project-Level Conformity
The proposed Project is in an attainment/maintenance area for federal CO standards, a nonattainment area for federal PM2.5, and an attainment/maintenance area for federal PM10 standards; thus, 40 CFR 93.109 requires a project-level hot-spot analysis for all three pollutants. The proposed Project does not cause or contribute to any new localized CO, PM2.5, and/or PM10 violations, or delay timely attainment of any NAAQS or any required interim emission reductions or other milestones during the timeframe of the transportation plan (or regional emissions analysis).
3.4.3 Interagency Consultation
Pursuant to the transportation conformity rules and regulations, all nonexempt projects must go through review by the SCAG Transportation Conformity Working Group (TCWG). Based on the exempt projects listed in Table 2 of 40 CFR 93.126 - Widening narrow pavements or reconstructing bridges (no additional travel lanes), the proposed Project is exempt from all project-level conformity requirements. A copy of the Transportation Air Quality Conformity Findings Checklist is included in Appendix B.
3.5 NEPA Analysis/Requirement
NEPA applies to all projects that receive federal funding or involve a federal action. NEPA requires that all reasonable alternatives for a proposed project be rigorously explored and objectively evaluated. As described above, the proposed Project is listed in a conforming RTP and FTIP.
Construction will last less than three years and will not substantially affect traffic due to detours, road
7.c
Packet Pg. 563 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
37 closures, and/or temporary terminations. Thus, impacts of the resulting traffic flow changes do not need to be analyzed.
3.6 CEQA Analysis/Requirement
This air quality study addresses pollutants for which California has established air quality standards (O3, PM10, PM2.5, CO, NO2, SO2, Pb, visibility-reducing particles, sulfates, H2S, and vinyl chloride), as well as GHGs, MSAT, and asbestos. Similar to NEPA, the analysis/documentation requirements for CEQA vary by pollutant (see the table in Section 4.1), ranging from a narrative describing that the pollutant is typically not a transportation issue to an emission analysis. Because construction would not last more than three years or substantially affect traffic due to detours, lane closures, and/or temporary bridge closures, the impacts of the resulting traffic flow changes do not need to be analyzed. For CEQA analyses, emissions from the future year Build Alternative scenarios are compared to emissions from the existing/baseline conditions.
EMission FACtors (EMFAC) is California’s federally-approved on-road mobile source emission inventory model that reflects California-specific driving and environmental conditions, fleet mix, and mobile source regulations. EMFAC is a computer model used for estimating emission rates for onroad mobile sources in California for calendar years 2000 to 2050. The EMFAC model supports CARB's regulatory and air quality planning efforts and fulfills the Federal Clean Air Act and the Federal Highway Administration’s transportation planning requirements. The U.S. EPA has approved EMFAC2017 for use in State Implementation Plan (SIP) and transportation conformity analyses. On September 27, 2019, the U.S. EPA and the National Highway Traffic Safety Administration (NHTSA) published the “Safer Affordable Fuel-Efficient (SAFE) Vehicles Rule Part One: One National Program.” (84 Fed. Reg. 51,310 (September 27, 2019.) The Part One Rule revokes California’s authority to set its own greenhouse gas emissions standards and set zero emission vehicle mandates in California.
Therefore, the approval of the Rule means that the previously approved EMFAC2017 model no longer accurately estimates future transportation emissions and requires off-model adjustment factors until the next update in order to reflect the impacts of the Rule. Note that the Rule affects emissions only from gasoline-powered Light Duty Vehicles (i.e. LDA, LDT1, LDT2, and MDV vehicle categories). CARB has provided off-model adjustment factors for EMFAC2017 to account for the impacts of the Rule (CARB 2019). These adjustment factors are multipliers that were applied to EMFAC emissions outputs for this project.
7.c
Packet Pg. 564 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
3. Affected Environment
38 This page intentionally left blank
7.c
Packet Pg. 565 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
39 4. Environmental Consequences
This section describes the methods, impact criteria, and results of air quality analyses of the proposed Project. Analyses in this report were conducted using methodology and assumptions that are consistent with the requirements of NEPA, CEQA, the CAAAs of 1990, and the CCAA of 1988. The analyses also use guidelines and procedures provided in applicable air quality analysis protocols, such as the Transportation Project-Level Carbon Monoxide Protocol (CO Protocol; Garza et al., 1997), Transportation Conformity Guidance for Quantitative Hot-Spot Analyses in PM10 and PM2.5 Nonattainment and Maintenance Areas (U.S. EPA 2015), and the FHWA Updated Interim Guidance on Air Toxics Analysis in NEPA Documents (FHWA 2016).
4.1 Impact Criteria
Project-related emissions would have an adverse environmental impact if they result in pollutant emission levels that either create or worsen a violation of an ambient air quality standard (identified in previously referenced Table 2-1) or contribute to an existing air quality violation. As analyzed in the following sections, neither the short-term construction impacts nor the long-term operational impacts would exceed thresholds with implementation of minimization measures.
4.2 Short-Term Effects (Construction Emissions)
4.2.1 Construction Equipment, Traffic Congestion, and Fugitive Dust
During construction, short-term degradation of air quality may occur due to the release of particulate emissions generated by excavation, grading, hauling, and other activities related to construction. Emissions from construction equipment also are anticipated and would include CO, NOx, volatile organic compounds (VOCs), directly emitted PM (PM2.5 and PM10), and TACs (e.g., diesel exhaust PM).
Site preparation and roadway construction would involve clearing, cut-and-fill activities, grading, and paving roadway surfaces. Construction-related effects on air quality from most roadway projects would be greatest during the site preparation phase because most engine emissions are associated with the excavation, handling, and transport of soils to and from the site. If not properly controlled, these activities would temporarily generate CO, NOx, VOCs, PM10, and PM2.5. Sources of fugitive dust would include disturbed soils at the construction site and trucks carrying uncovered loads of soils.
Unless properly controlled, vehicles leaving the site would deposit mud on local streets, which could be an additional source of airborne dust after drying. PM10 emissions would vary from day to day, depending on the nature and magnitude of construction activity and local weather conditions. PM10
7.c
Packet Pg. 566 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
40 emissions would also depend on soil moisture, the silt content of soil, wind speed, and the amount of equipment operating at the time. Larger dust particles would settle near the source, while finer particles would be dispersed over greater distances from the construction site.
In addition to dust-related PM10 emissions, heavy trucks and construction equipment powered by gasoline and diesel engines would generate CO, NOx, VOCs, and some soot particulate (PM2.5 and PM10) in exhaust emissions. If construction activities were to increase traffic congestion in the area, CO and other emissions from traffic would increase while those vehicles are delayed. These emissions would be temporary and limited to the immediate area surrounding the construction site. Areas within 500 feet of CARB-defined sensitive land uses would be labeled as no-idle areas where material storage/transfer and equipment maintenance activities are not to occur.
SO2 is generated by oxidation during combustion of organic sulfur compounds contained in diesel fuel. Off-road diesel fuel meeting federal standards can contain up to 5,000 ppm of sulfur, whereas on-road diesel is restricted to less than 15 ppm of sulfur. However, under California law and CARB regulations, off-road diesel fuel used in California must meet the same sulfur and other standards as on-road diesel fuel, so SO2-related issues due to diesel exhaust would be minimal.
The construction emissions were estimated for the proposed Project using the Sacramento Metropolitan Air Quality Management District’s Road Construction Emissions Model, Version 9.0.0, which is consistent with the guidance provided by the SCAQMD for evaluating construction impacts from roadway projects. Table 4-1 presents the maximum amount of construction-related emissions during a peak construction day (model data are provided in Appendix C). The PM10 and PM2.5 emissions assume a 50 percent control of fugitive dust as a result of watering and associated dustcontrol measures. The Project construction emissions presented below are based on the best information available at the time of calculations and specify that the schedule for construction of the Build Alternative is anticipated to take approximately 14 months. Additionally, the SCAQMD has established rules for reducing fugitive dust emissions. With the implementation of standard construction measures (providing 50 percent effectiveness) such as frequent watering (e.g., a minimum of twice per day) as well as Minimization Measures AQ-1 through AQ-6 (see Chapter 6, Minimization Measures), fugitive dust and exhaust emissions from construction activities would not result in any adverse air quality impacts.
Table 4-1. Maximum Daily Project Construction Emissions Project Phases ROG CO NOx Total PM10 Total PM2.5
Grubbing/Land Clearing (lbs/day) 1.11 9.87 11.99 16.52 3.79 Grading/Excavation (lbs/day) 9.30 69.99 105.01 20.31 7.22 Drainage/Utilities/Sub-Grade (lbs/day) 6.38 50.78 69.79 18.91 6.00 Paving (lbs/day) 1.02 13.22 12.02 0.60 0.50
Maximum (lbs/day) 9.30 69.99 105.01 20.31 7.22
Total (tons/construction project) 0.98 7.65 10.96 2.55 0.85 Source: Compiled by LSA (September 2020).
CO = carbon monoxide
lbs/day = pounds per day
NOx = oxides of nitrogen
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
7.c
Packet Pg. 567 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
41 Construction activities would not last for more than three years at one general location, so construction-related emissions do not need to be included in regional and project-level conformity analysis (40 CFR, Section 93.123(c)(5)).
Prior to the commencement of any construction activities, the Construction Contractor will submit a Construction Emission Control Plan for review and approval to the City of Colton Department of Public Works, which will be implemented during construction. The Construction Emission Control Plan will comply with federal, State, and local regulations as specified below:
The contractor will adhere to the Caltrans Standard Specifications for Construction, Sections
14.9-01, 14.9-02, 14-9.03, 18-1.02C, and 18-1.03 (or Greenbook equivalent specifications). Section 14-9-02 specifically requires compliance by the contractor with all applicable laws and regulations related to air quality, including air pollution control district and air quality management district regulations and local ordinances.
Water or a dust palliative will be applied to the site and equipment as often as necessary to control fugitive dust emissions. Fugitive emissions generally must meet a “no visible dust” criterion either at the point of emissions or at the right-of-way line depending on local regulations in compliance with the SCAQMD Rule 403 (Fugitive Dust). Soil binder will be spread on any unpaved roads used for construction purposes, and on all project construction parking areas (providing an estimated 50 percent reduction of fugitive emissions) in compliance with the SCAQMD Rule 403 (Fugitive Dust). Trucks will be washed as they leave the right-of-way as necessary to control fugitive dust emissions in compliance with the SCAQMD Rule 403 (Fugitive Dust). Construction equipment and vehicles will be properly tuned and maintained. All construction equipment will use low-sulfur fuel as required by California Code of Regulations (CCR) Title 17, Section 93114.
A dust control plan will be developed documenting sprinkling, temporary paving, speed limits, and timely revegetation of disturbed slopes as needed to minimize construction impacts to existing communities in compliance with the SCAQMD Rule 403 (Fugitive Dust). Equipment and material storage sites will be located as far away from residential and park uses as practicable. Construction areas will be kept clean and orderly in compliance with the SCAQMD Rule 402 (Nuisance).
Environmentally sensitive areas will be established near sensitive air receptors. Within these areas, construction activities involving the extended idling of diesel equipment or vehicles will be prohibited to the extent feasible [as required by CCR Title 13, Section 2485(c)]. Track-out reduction measures will be used, such as gravel pads at project access points to minimize dust and mud deposits on roads affected by construction traffic, in accordance with the State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4). All transported loads of soils and wet materials will be covered before transport, or adequate freeboard (space from the top of the material to the top of the truck) will be provided to minimize emission of dust during transportation in compliance with the SCAQMD Rule 403.
7.c
Packet Pg. 568 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
42 Dust and mud that are deposited on paved, public roads due to construction activity and traffic will be promptly and regularly removed to reduce PM emissions [State Vehicle Code Section 23114, with special attention to Sections 23114(b)(F), (e)(2), and (e)(4)]. To the extent feasible, construction traffic will be scheduled and routed to reduce congestion and related air quality impacts caused by idling vehicles along local roads during peak travel times (consistent with the traffic control plan approved by the City of Colton Traffic Engineer). Mulch will be installed or vegetation planted as soon as practical after grading to reduce windblown PM in the area. Note that certain methods of mulch placement, such as straw blowing, may themselves cause dust and visible emission issues and may require controls such as dampened straw [Caltrans Standard Specifications for Construction, Sections 18.1-02C (Dust Control Binders) and 18-1.03 (Construction – Dust Palliatives) or Greenbook equivalent].
4.2.2 Asbestos
The proposed Project is in San Bernardino County, which is among the counties listed as containing serpentine and ultramafic rock. However, the portion of San Bernardino County in which the proposed Project lies is not known to contain serpentine or ultramafic rock, according to the California Department of Conservation, Division of Mines and Geology (2000). Therefore, the impact from naturally occurring asbestos during Project construction would be minimal to zero. In the unlikely event that naturally occurring asbestos, serpentine, or ultramafic rock is discovered, SCAQMD will be notified per Section 93105, Title 17 of the CCR.
There is the potential for asbestos-containing materials (ACM) to be present in the existing bridge structure or in buildings on properties that would be acquired. If asbestos is found to be present in structures that would be modified as part of the Build Alternative, the certified asbestos abatement specialist would monitor the removal and disposal of the ACMs as they are uncovered. The contractor will be required to comply with Caltrans Standard Specifications Section 14-9.02 or Greenbook equivalent specification pertaining to air pollution control compliance with rules, regulations, ordinances, and statutes during renovation and demolition activities.
4.2.3 Lead
Lead is normally not an air quality issue for transportation projects unless the Project involves disturbance of soils containing high levels of aerially deposited lead, or painting or modification of structures with lead-based coatings. An aerially deposited lead (ADL) survey will be conducted to identify soils within the Project area containing high levels lead.
There is the potential for lead-based coatings in buildings on properties that would be acquired. If lead-based coatings are found to be present in structures that would be modified as part of the Build Alternative, the lead abatement specialist would monitor the removal and disposal of the lead-based coatings/soils as they are uncovered. The contractor will be required to comply with Caltrans Standard Specifications 14-9.02, 2015 or Greenbook equivalent specification pertaining to air
7.c
Packet Pg. 569 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
43 pollution control compliance with rules, regulations, ordinances, and statutes during renovation and demolition activities.
4.3 Long-Term Effects (Operational Emissions)
The purpose of the project is to provide safe connectivity between La Cadena and the Barton Road/Interstate 215 (I-215) interchange and to facilitate efficient access between Colton and Grand Terrace. The potential impact of the proposed Project on regional vehicle emissions was calculated using traffic data for the Project region and emission rates from the Emission Factor Model, Version 2017 (EMFAC2017).
The Project Area traffic for the existing Baseline, No Build Alternative, and Build Alternative were estimated using data from the Traffic Study Report (KOA 2020). The traffic data, along with the EMFAC2017 emission rates, were used to calculate the CO, reactive organic gases (ROG), NOx, PM10, and PM2.5 emissions for the existing condition (2019), opening year 2023, and horizon year 2045. The modeling results are summarized in Table 4-2 and are included in Appendix D.
Table 4-2. 2023 Opening Year and 2045 Horizon Year Regional Vehicle Emissions Alternative
2023 Opening Year (lbs/day)
Vehicle Exhaust Fugitive Dust
ROG CO NOx PM10 PM2.5 PM10 PM2.5
Existing (2019) 0.54 13.78 3.87 0.06 0.58 0.05 0.23
No Build Alternative (2023) 0.64 16.86 4.23 0.05 1.00 0.05 0.40 Change from Existing 0.10 3.09 0.36 0.00 0.41 0.00 0.16 Build Alternative (2023) 0.47 14.33 3.64 0.04 1.00 0.04 0.40 Change from Existing -0.07 0.55 -0.22 -0.02 0.41 -0.01 0.16 Change from No Build
Alternative -0.17 -2.53 -0.58 -0.01 0.00 -0.01 0.00
Alternative
2045 Horizon Year (lbs/day)
Vehicle Exhaust Fugitive Dust
ROG CO NOx PM10 PM2.5 PM10 PM2.5
Existing (2019) 0.54 13.78 3.87 0.06 0.58 0.05 0.23
No Build Alternative (2045) 0.56 12.28 2.38 0.03 1.43 0.03 0.57 Change from Existing 0.02 -1.50 -1.49 -0.03 0.85 -0.02 0.34 Build Alternative (2045) 0.50 11.67 2.04 0.03 1.43 0.03 0.57 Change from Existing -0.04 -2.11 -1.83 -0.03 0.85 -0.03 0.34 Change from No Build
Alternative -0.06 -0.61 -0.34 0.00 0.00 0.00 0.00
Source: Compiled by LSA using EMFAC2017 with SAFE Rule adjustment factors.
Note: Totals may not appear to total correctly due to rounding. Fugitive dust consists of tire and brake wear and re-entrained road dust.
CO = carbon monoxide
EMFAC = Emission Factor Model
lbs/day = pounds per day
NOx = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
7.c
Packet Pg. 570 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
44 As Table 4-2 shows for the vehicle exhaust emissions in 2023, the No Build and Build Alternative emissions are all lower than the existing condition emissions, except for fugitive dust PM10 and PM2.5 emissions. Additionally, the Build Alternative for horizon year 2045 criteria pollutant emissions from vehicle exhaust are all less than the No Build Alternative emissions. The fugitive PM2.5 and PM10 emissions consist of tire wear, brake dust, and re-entrained road dust emissions that are purely related to the increased regional VMT. The slight increase in fugitive dust PM10 and PM2.5 emissions will not cause violations of the State PM10 and PM2.5 ambient air quality standards in the South Coast Air Basin. The proposed Project would not substantially contribute to or cause deterioration of existing air quality.
4.3.1 Carbon Monoxide Analysis
The methodology required for a CO local analysis is summarized in the Caltrans Transportation Project-Level Carbon Monoxide Protocol (CO Protocol), Section 3 (Determination of Project Requirements) and Section 4 (Local Analysis).
In Section 3, the CO Protocol provides two conformity requirement decision flowcharts designed to assist project sponsors in evaluating the requirements that apply to specific projects. The flowchart in Figure 1 (Appendix E of this report) of the CO Protocol applies to new projects and was used in this local analysis conformity decision. The following provides a step-by-step explanation of the flowchart. Each level cited is followed by a response, which in turn determines the next applicable level of the flowchart for the project (Garza et al., 1997).
The flowchart begins with Section 3.1.1:
3.1.1. Is this project exempt from all emissions analyses? No.
Table 1 of the CO Protocol is Table 2 of 40 CFR, Section 93.126. The CO flowchart inquires whether the project is exempt. Such projects appear in Table 1 of the CO Protocol. The Build Alternative is not one of the exempt projects listed in Table 1 of the CO Protocol; therefore, the proposed Project is not exempt from all emission analyses. 3.1.2. Is the project exempt from regional emissions analyses? No.
Table 2 of the CO Protocol is Table 3 of 40 CFR, Section 93.127. The question attempts to determine whether the proposed Project is listed in Table 2. Projects that are included in Table 2 of the CO Protocol are exempt from regional conformity. Because the proposed Project would expand and add traffic lanes to an existing bridge, it is not exempt from regional emission analysis.
7.c
Packet Pg. 571 Attachment: Exhibit C_Part1 - Barton Road Bridge Removal ISMND (3479 : CEQA - Barton Road Bridge Removal and Road Construction
4. Environmental Consequences
45 3.1.3. Is the project locally defined as regionally significant? No.
As noted above, the proposed Project would replace an existing two lane bridge with a widened two-lane surface road. Therefore, the proposed Project is not regionally significant. 3.1.4. Is the project in a federal attainment area?
No.
The proposed Project is within an attainment/maintenance area for the federal CO standard; therefore, the Project is subject to a regional conformity determination. 3.1.5. Are there a currently conforming Regional Transportation Plan (RTP) and Transportation Improvement Program (TIP)?
Yes.
Refer to Appendix A.
3.1.6. Is the project included in the regional emissions analysis supporting the currently conforming RTP and TIP?
Yes.