Cities Index.
Agenda packet, regular meeting, second session

Colton City Council
June 17, 2025

Document
Agenda packet, regular meeting, second session
Meeting
June 17, 2025
Body
Colton City Council
Pages
41
Original file
72.6 MB
Text extracted from the city's file for reading and search. Open the original on coltonca.api.civicclerk.com. That file is the official record.

12.b
Packet Pg. 402
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) Qty Part # Description List $ Selling $ Ext. Selling $
1 INSTALL Other Product 1 - Surfacing Option 3-
•Install approximately 4,383 sq. ft. of 3½” Pro-Tect TurfTM •100% standard color wear course.
•Standard colors (Blue, Green, Beige, Red).
•Use of California recycled tires.
•Use of aromatic binder.
•Prevailing wages.
•Removal of our construction debris.
•Price includes one (1) move-on only.
•Standard two-year warranty.
$99,995.00 $99,995.00 $99,995.00
1 PPBOND Payment and Performance Bond - Payment & Performance Bond $8,650.00 $8,650.00 $8,650.00 Sub Total $475,214.81
GameTime Freight $17,209.18
GT-Shade Freight $2,715.89
Tax $19,515.55
Total $514,655.43
Comments
Your Sales Rep is Myles Harvey . Please reach out to Myles at 805-320-9007 if you should have any questions regarding this quote.

Due to the volatility of freight costs, the freight pricing is subject to change at the time of order .

Pricing is subject to change. Request updated pricing when purchasing from quotes more than 30 days old.

Shipping to:
2141 Orange Ave
Escondido, CA 92029
Phone (760) 546 2405
Site Address:

Rich Dauer Park
951 Torrey Pines Dr S
Colton, CA 92324
Shipping Contact:

Phone (760) 546 2405
Owner's Kit:

Deb Farrar
[email protected]
670 Colton Avenue
Colton, CA 92324
909-370-6157
*Freight charges are based on listed zip code and are subject to change if shipping information changes. *Deposit may be required.

Customer is responsible for offloading.

Permitting not included, unless otherwise noted
Prevailing Wage
Great Western Installations, Inc
975 S. State Hwy 89
Logan, UT 84321
Cell: 805-320-9007
Office: 435-245-5055
Fax: 435-245-5057
[email protected]
www.gwpark.com
05/29/2025
Quote #
114719-01-03
Rich Dauer Park Playground Option 3

Page 2 of 4 ends

12.b
Packet Pg. 403
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) ACCEPTANCE OF QUOTATION:

Billing and Shipping information will be as stated on quote unless indicated below .

Change billing information to:

Address: _______________________________________________________ ________________________________________________________ Contact: _______________________________________________________ Change shipping information to:

Address: _______________________________________________________ ________________________________________________________ Contact: _______________________________________________________ Colors: Per Renderings Yes or No
Palette _____________________________
Per Submittals ____________________________________________________________ Other Colors, please specify __________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ Purchase Amount: $514,655.43
Signature: _______________________________________ Date: _____________________ Printed Name: ____________________________________ Title: _______________________ Acceptance of this proposal indicates your agreement to the terms and conditions stated herein.

DIR #1000028191 CSLB #929912 B & C61/D34
Great Western Installations, Inc
975 S. State Hwy 89
Logan, UT 84321
Cell: 805-320-9007
Office: 435-245-5055
Fax: 435-245-5057
[email protected]
www.gwpark.com
05/29/2025
Quote #
114719-01-03
Rich Dauer Park Playground Option 3

Page 3 of 4 ends

12.b
Packet Pg. 404
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) TERMS & CONDITIONS:

Remittance Address:
975 S. Hwy 89
Logan, UT 84321
PRICING: Pricing is subject to change. Request updated pricing when purchasing from quotes more than 30 days old.

PAYMENT TERMS: Net 30 days subject to approval by Credit Manager. A signed P.O. made out to Great Western Recreation or this signed quotation is required for all orders unless otherwise noted. Equipment shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Checks should be made payable to Great Western unless otherwise directed.

FINANCE CHARGE: A 1.5% monthly finance charge (or as permitted by law) will be added to invoices over 30 days past due.

TAXES: Taxes will be shown as a separate line item when included. Any applicable taxes not shown will be added to final invoice. A copy of your tax exemption certificate must be submitted at time of order or taxes will be added to your invoice.

MINIMUM ORDER: Our minimum order is $50 (USD) Any order less than $5000 requires cash with order or payment by major credit card.

SHIPMENT: Multiple shipments may be required based on point of origin. Above costs assume one shipment for each vendor quoted.

DELIVERY: It is the responsibility of the owner to offload and inventory equipment, unless other arrangements have been made. Missing or damaged equipment must be reported within 60 days of acceptance of delivery.

INSTALLA TION CONDITIONS:

ACCESS: Site should be clear, level and allow for unrestricted access of trucks and machinery.

STORAGE: Customer is responsible for providing a secure location to off-load and store the equipment during the installation process.

Once equipment has delivered to the site, the owner is responsible should theft or vandalism occur unless other arrangements are made and noted on the quotation.

FOOTER EXCAVATION: Installation pricing is based on footer excavation through earth/soil only. Customer shall be responsible for unknown conditions such as buried utilities (public & private), tree stumps, rock, or any concealed materials or conditions that may result in additional labor or materials cost.

UTILITIES: Owner is responsible for locating any private utilities.

ADDITIONAL COSTS: Pricing is based on a single mobilization for installation unless otherwise noted. Price includes ONLY what is stated in this quotation. If additional site work or specialized equipment is required, pricing is subject to change.

Great Western Installations, Inc
975 S. State Hwy 89
Logan, UT 84321
Cell: 805-320-9007
Office: 435-245-5055
Fax: 435-245-5057
[email protected]
www.gwpark.com
05/29/2025
Quote #
114719-01-03
Rich Dauer Park Playground Option 3

Page 4 of 4 ends

12.b
Packet Pg. 405
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440
Once your order is received, it is sent to the
company headquarters in Fort Payne, Alabama.

You will receive a confirmation letter, confirming
your order and the projected delivery date. If you
have included installation in your order, an installer
will also contact you before the order ships to
confirm the details regarding
• site preparation requirements
• surfacing type and depth
• underground utility locations
• coordination with other trades
• accessibility to the site for delivery/installation.

Your order will ship via common carrier 24-45 days
after its acceptance into the GameTime system.

Depending on how far from Fort Payne, Alabama
you are located, the order should arrive in 3-10 days
after shipment.

AFTER YOU PLACE YOUR ORDER
What to expect in the schedule of events that take place after your order.

THE TIMELINE
Your freight carrier will contact you 24 hours in
advance of the delivery. You will need 2-4 people to
help you unload. Heavier items like the MegaRock®
might require additional helpers.

Your equipment will arrive in large consolidated
boxes. You may want to break them open on the
truck and unload piece by piece for easier handing.

Be sure to locate the box labeled “Installation
Instructions Inside” and set it aside.

You will also want to make sure you have a secure
location to store all your equipment until the
installation day. Your driver will give you a bill of
lading, documenting the number of boxes, as well
as a listing of component number of the parts that
you should have received. Before signing the receipt,
you’ll want to inventory the shipment and note any
missing items on the bill of lading before the driver
leaves.

12.b
Packet Pg. 406
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440

WARRANTY
GameTime offers a comprehensive warranty on all of our products.

For the purpose of this warranty, “lifetime” encompasses no specific term of years, but rather that the Seller warrants to its original customer for as long as the original customer owns the product, and uses the product for its intended purpose, that the product and all its parts will be free from defects in material and manufacturing workmanship.
• Lifetime limited warranty on PowerScape
®, PrimeTime®, Xscape® & IONiX® and Modern City® uprights. • Lifetime limited warranty on Tru-Loc® connections and upright bolt-through connections. • Lifetime limited warranty on all hardware.
• Twenty-Year limited warranty on Timber Décor & Timbers recycled plastic lumber. • Fifteen-Year limited warranty on metal decks, pipes, rungs, rails, loops, braces, and footbucks. • Fifteen-Year limited warranty on rotationally-molded products. • Fifteen-Year limited warranty on VistaRopeTM nylon bearings and ring junction pieces. • Ten-Year limited warranty on GTFit®, THRIVE® and Challenge Course posts & bars. • Ten-Year limited warranty on site furnishings against structural failure. • Ten-Year limited warranty on SunBlox products.
• Ten-Year limited warranty on fiberglass and DHPL signage. • Ten-Year limited warranty on VistaRopeTM WeaveTechTM cables. • Five-Year limited warranty on Tuff Forms® structures, including TuffCrete and PolyShield. • Five-Year limited warranty on nylon-covered cable net climbers and components. • Five-Year limited warranty on GT Symphony FreenotesTM Harmony Park components. • Five-Year limited warranty on Super Seats.
• Five-Year limited warranty on premature wear of VistaRope cables. • Three-Year limited warranty on EveryBODY Plays® polyurea coated foam & rubber strips. • Three-Year limited warranty on SaddleMates rubber and “C”-springs. • Three-Year limited warranty on rubber seat and rubber mats for net events. • One-Year limited warranty on Challenge Course timing components. • One-Year limited warranty on all other GameTime products.

TO THE EXTENT PERMITTED BY LAW, THESE WARRANTIES ARE EXPRESSLY IN LIEU OF ANY OTHER

IMPLIED OR EXPRESSED WARRANTIES OR REPRESENTATIONS BY ANY PERSON, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS. Warranties do not cover damage caused by vandalism or abuse. Warranty claims must be filed within the applicable warranty period and accompanied by a copy of the original invoice or GameTime invoice number.

12.b
Packet Pg. 407
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440
We want to make sure our installers know safety
regulations, industry standards, and how they apply
when installing equipment. It is important to us that
your installation process goes smoothly, and that
everything is done to our exacting specifications. It
isn’t enough to send our installers to a third party
GameTime’s exclusive Certified Installer Training
course has a two-part curriculum. First attendees
learn about installation in a hands-on lab where
they assemble play structures under the watchful
eyes of our on-staff professionals. They learn about
new products, modifications, and new industry
information. They are also instructed on CPSC, ASTM,
and industry regulations in relation to our products
and proper installation. They learn how to properly
locate and drill ground holes, recognize and avoid
underground utilities, and use the tools needed to
ensure an accurate installation.

The course also includes a lecture series, with focuses on risk management, insurance and many other
topics that give installers the knowledge and skills
to make your playground everything you expect it to

INSTALLATION EXCELLENCE
Our manufacturer-specific training course is unique and is acknowledged in the industry as a program that should be a model for all.

INSTALLERS WHO SHARE OUR VISION

CERTIFICATION MATTERS
certification program. We want to meet them,
teach them, and make sure they know how to install
products. All playground equipment is different, and
we want to ensure that when they learn how to put
a play structure together, they are training on one of
ours.
be. With this training, we can have the confidence
all of our playgrounds are being installed correctly,
expertly, and to the exacting standards we maintain
throughout the process.

This manufacturer specific training course is unique
to GameTime, and is acknowledged in the industry
as a program that should be a model for all. It’s just
one more thing that sets GameTime apart, and one
more reason you can trust us to be your playground
company.

12.b
Packet Pg. 408
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440

INSURANCE
GameTime has $51 Million in product liability insurance.

GameTime’s per occurance insurance policy is one of the strongest in the industry. By definition, a Per Occurance policy provides coverage for an accident that occurred during the term of the policy, even if the policy is subsequently changed or terminated. This is superior to a Claims Made policy, which does not provide such coverage. The certificate pictured is for informational purposes only, and may not be current. A copy of the current certificate is available on request.

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-

STATUTE
PER

LIMITS(MM/DD/YYYY)

POLICY EXP
(MM/DD/YYYY)

POLICY EFF

POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE

DAMAGE TO RENTED
$PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-

JECT LOC

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2016 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
C
2,000,000
08/01/2020
MKLV2PBC000367
Manashi Mukherjee
UB-7J602089-19-14-G
10,000,000
ATL-004720415-32
1,000,000
10,000,000
UB-2N159031-19-51-K
X
25674
10,000,000
Aggregate
of Marsh USA Inc.

Atlanta, GA 30326
N
X
Comp./Coll. Ded.: $1,000
SIR $250,000 Per Occ.
08/01/2019
National Union Fire Ins Co. of Pittsburgh PA
12 08/01/2020
08/01/2019
25666
08/01/2020
TJ-CAP-9D897065TIL-19
Excess Umbrella
F
4,000,000
25615
2,000,000
(See Additional Page.)
20699
Travelers Property Casualty Company Of America
1,000,000
X
E
08/02/2019
15,000,000
08/01/2019
15,000,000
08/01/2019
For Information Only
X
08/01/2019

POLICY AGGREGATE
150 PlayCore Drive SE
Fort Payne, AL 35967
GameTime
The Travelers Indemnity Company of America
25,000
X
A
The Charter Oak Fire Insurance Co.

B
ACE Property And Casualty Ins Co
CN102326389-CAS-GAUWX-19-20
Each Occurrence

EXCLUDED
08/01/2020
1,000,000
XOOG71549501 001
D
4,000,000
35378
100,000
1,000,000
08/01/2020
UB-2N106953-19-51-R
Two Alliance Center
Marsh USA, Inc.

X
3560 Lenox Road, Suite 2400
Attn: [email protected] / Fax: 212-948-4321 X
A Division of PlayCore WI, Inc.

GameTime
Fort Payne, AL 35967
150 PlayCore Drive SE
X
X
BE 015899319
08/01/2019
A Division of PlayCore Wisconsin, Inc.
08/01/2019
B
08/01/2020
19445
08/01/2020
Evanston Insurance Company

12.b
Packet Pg. 409
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440
• 5” diameter uprights available in aluminum or
galvanized steel
• An extensive offering of play components and
signature products
• Lifetime limited warranty on uprights, posts and
hardware
• Tru-Loc® offers connections with up to 66%
less hardware for easier construction and
maintenance
Our patented Tru-Loc® is far superior to the average
“clamp around” system!
• Patented Direct Bolt connections are stronger
and more durable than other methods
• Connection offers sleeker lines and cleaner
designs
• Tru-Loc® Panel Connector is ASTM/EN/CSA
compliant
• Smooth “kid-friendly” connection point, no
rough edges
• Connections are concealed within the sleeve,
no exposed hardware

POWERSCAPE
GameTime’s premier 5” play system for ultra-tough durability.

EVERYTHING YOU WANT FROM A PLAY SYSTEM

THE TRU-LOC ADVANTAGE
• Largest decks in the industry and slip-resistant
Tuff Clad® deck coatings for increased footing
• Entry archways to help direct traffic and prevent
inadvertent falls
• Tough, baked-on powder coat finish
• Exclusive Direct BoltTM technology
• IPEMA certified to ASTM standards
TRU-LOC® DIRECT BOLTTM CONNECTION STANDARD CLAMP
1 2
3 4
10 11
12 13
5 6
7 8
9 1
2 3 4

12.b
Packet Pg. 410
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440
Several key people at GameTime, including our Manager of Compliance and Standards, serve on the ASTM committee that sets the standards for the entire playground industry. GameTime products conform to that standard, ASTM F1487- 11, the Standard Consumer Safety Performance Specification for Playground Equipment for Public Use.

The Consumer Product Safety Commission is an independent agency within the United States Federal Government with the authority to inform the public of current product safety performance information and recommended practices. The CPSC first published their guidelines for public playgrounds in 1981 and have updated their publication since then. The current CPSC Handbook for Public Playground Safety, publication #325, is an excellent guide for owners and operators of public play environments.

GameTime is one of the founding members of IPEMA, and several of our people serve as board members, committee members and chairpersons of the association. In the interest of public playground safety, IPEMA provides a 3rd party certification, to validate conformance to established standards. Our use of the IPEMA seal is your assurance that GameTime has received written validation from an independent lab that the products associated with the seal conform with the ASTM standard, as well as the Canadian CSA standard CAN Z-614. A list of our validated products may be found on the IPEMA website, www. ipema.org.

GameTime’s GT Impax product provides you with the assurance that our surfacing has been certified as compliant to the appropriate ASTM standard. In the interest of public playground safety, IPEMA provides a third party certification to validate a manufacturer’s conformance to the ASTM F-1292-99 Standard Specification for Impact Attenuation of Surface Systems Under And Around Playground Equipment. The use of the IPEMA Certification Seal signifies that the manufacturer has received written validation from the independent laboratory that the product associated with the use of the seal conforms with the requirements of ASTM F1292-99. A complete list of our validated products may be found on the IPEMA website at www.ipema.com.

GameTime is the only manufacturer to have a lab partnership with an Institute for children with special needs, so that we can develop and test our accessible products before bringing them to market. GameTime is the only manufacturer to meet accessibility guidelines on all of its pre-designed PowerScape and PrimeTime playground plans. We also recommend accessible surfacing options. For more information, log on to www.access-board.gov GameTime is the first playground manufacturer to obtain the ISO 9001:2000 standard. In order to obtain this certification, the company’s manuals, policies, objectives and quality procedures are closely examined during a surveillance audit by ISO representatives. Strict attention is paid to policies and procedures in manufacturing, communication channels, system monitoring, customer relations and order processing, which are reviewed for consistency and standards. Companies who meet the standard are awarded the ISO designation.

An international organization that is a European Union Notified and Competent Body, providing testing and certification.

Use of the TUV seal demonstrates that products have passed a comprehensive testing procedure based upon the European Harmonized Standard for Commercial Playground Equipment, and that the GameTime plant is regularly monitored by TUV.

COMPLIANCE
Industry standards set a minimum level that playground manufacturers must meet. We meet or exceed those standards, because we understand that the ultimate playground offers peace of mind, as well as playful experiences.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
CPSC

IPEMA EQUIPMENT CERTIFICATION

IPEMA SURFACING CERTIFICATION
ADA
ISO 9001:2000
TUV

12.b
Packet Pg. 411
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440
It’s our responsibility to act as stewards of our planet and its natural resources. It’s also our mission to
create fun, active, and innovative places for families
to gather and play. Our environmental sustainability
efforts are intended to help ensure children of
today can take their grandchildren to playgrounds
in the future. Our approach to stewardship and
sustainability encompasses every aspect of
our company - from the way we manufacture
our products to how we do business. Children
learn many valuable life skills on playgrounds.

We’ve learned some important lessons, too.

We continuously strive to be environmentally
responsible and to make sure future generations
benefit from our efforts.

Cardboard: 26.1 tons
Paper: 9.4 tons
Scrap plastics: 137.1 tons
Computer equipment: 5,135 lbs.

Plastic bottles: 26,568
Fluorescent bulbs: (4’) 240
• We work with our suppliers to source the most
environmentally preferable materials for our
products.
• We include as much pre-consumer and post-
consumer recycled content in our products as
possible – without compromising the quality,
durability, and performance.
• We’re updating light fixtures, upgrading air
compressors, and conducting energy audits
because every small improvement leads to
significant reductions in our overall environmental
impact.
• We’ve implemented a variety of initiatives to
reduce water consumption in our facilities,
including the use of high-efficiency technology for
product painting and washing.
• We recycle the vast majority of waste at our
manufacturing facility, including 100% of
manufacturing process waste like scrap metal,
rotationally molded plastic and paper. We recycle
the majority of our administrative waste, too.

RECYCLED AND RECYCLABLE CONTENT
Environmentally responsible play systems that last for decades, not years.

OUR PLAYGROUNDS ARE DESIGNED FOR FAMILIES AND TO
MINIMIZE THE IMPACT ON THE PLANET WHERE WE PLAY.
125,000 INDIVIDUAL PARTS
400,000 SQUARE FEET

ONE ENVIRONMENTAL COMMITMENT

RECYCLING (ANNUAL)
4 5
6 7
1 2
3 4
5 6
7 3
2 1 100% recyclable plastics are manufactured using efficient processes Steel tubing is 100% recyclable and contains 50% post-consumer recycled materials 100% recycled plastic lumber
Aluminum uprights are 100% recyclable and contain 65% pre-consumer and 10% post-consumer recycled content
100% recyclable plastics
Steel decks and stairs are 100% recyclable and contain 30% pre-consumer and 68% post-consumer recycled content
100% recycled plastic curbs
Ballasts: 25
Fork lift batteries: 15
PVC trimmings: 2.4 tons
Steel: 3,404,260 lbs.

Aluminum: 23,568 lbs.

12.b
Packet Pg. 412
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440

MATERIAL COLOR OPTIONS
Actual colors may differ from the images represented here. Contact your local GameTime representative for sample materials.

METAL PLASTIC
Metallic
Champagne
Bronze
Ice Butter
White
Black
Dark Green
Starlight Black
Sage
Beige
Brown
Ice Mint
Green
Vanilla
Azure
Sky Blue
Red
Yellow
Orange
Burgundy
Ocean
Chartreuse
Spring Green
Royal Purple
Blue
Periwinkle
Butterscotch
Sea Mist
Champagne
Beige
Green
Brown
Chartreuse
Spring Green
Blue
Sky Blue
Azure
Periwinkle
Royal Purple
Red
Burgundy
Orange
Yellow
HDPE
Dolphin Gray
Black
Beige
2 COLOR HDPE
Brown
Green
Spring Green
Blue
Sky Blue
Azure
Purple
Burgundy
Red
Orange
Yellow
Azure/White
Purple/White
Beige/Green
Red/White
Black/White
Sky Blue/White
Brown/White
Spring Green/White
Burgundy/White
White/Black
Gray/Black
Yellow/Black
Green/White
Orange/White
Blue/White

12.b
Packet Pg. 413
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) gametime.com 800.235.2440

SHADE FABRIC
Sandstone Deep Granite
RedRed
Sky BlueSky Blue
YellowYellow
BrownBrown
NaturalNatural
BlackBlack
Red/BlackRed/Black
Red/Sky BlueRed/Sky Blue
Sky Blue/YellowSky Blue/Yellow
Green/BrownGreen/Brown
WALLCANO ® HANDHOLDS

SPECIAL ROCK
*Colors for VistaRope products only. All standard GameTime ropes are black.

Beige
Blue
Green
Red
Gray

SITE RECYCLED PLASTIC LUMBER
Tudor
Sand
DECKS

VISTA ROPETM STANDARD

VISTA ROPETM CUSTOM
CharcoalCharcoal
SilverSilver
Forest GreenForest Green
Dove BlueDove Blue
Bottle GreenBottle Green
LimeLime
Navy BlueNavy Blue
True BlueTrue Blue
PurplePurple
YellowYellow
Blue
Brown NEW! Chocolate Gray
CreamCream
BeigeBeige
LatteLatte
CedarCedar
BrownBrown
TurquoiseTurquoise
Royal PurpleRoyal Purple
Sun BlazeSun Blaze
Deep OchreDeep Ochre
OrangeOrange

MATERIAL COLOR OPTIONS

12.b
Packet Pg. 414
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

1 PRO-TECT TURF™
Resilient Playground Surfacing

Presented by:

T.J. Janca Construction, Inc.

Exclusive Distributors and Installers of Pro-Tect Turf™

12.b
Packet Pg. 415
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

2 12.b
Packet Pg. 416
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

3 Pro-Tect Turf™ PLAYGROUND SURFACING

PRODUCT DESCRIPTION

Pro-Tect Turf™ is composed of high grade, granulated rubber and elastomeric resins. These components combine to form a remarkably durable surface that will stretch and contract slightly with temperature changes and minor substrate movement. It is designed to reduce i njury caused by falls, by transferring the impact to the softer shock absorbing cushion. Pro-Tect Turf ™ reduces the impact of a falling child from 2 feet to 1 1 feet, yet is firm enough to support wheelchair access.

Pro-Tect Turf ™ is a two -layer system. The first layer is a shock pad consisting of 100% California recycled raw shredded rubber buffings. The buffings are bound by aromatic urethane and troweled into place. Thickness of shock pad is based on ASTM F1292 -04, "Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment.” The second layer or wear surface is applied over the shock pad and consists of EPDM or TPV colored rubber granules. Pro-Tect Turf™ is suited for installation over hard surfaces such as asphalt, concrete, wood, tile, or brick. It can also be installed over compacted aggregate or sand. Pro-Tect Turf ™ is mixed on site and hand -troweled to the substr ate to create a beautiful, seamless rubber surface.

Shock Pad – Base Mat

Pro-Tect Turf ™ shock absorbing properties are adjusted by the thickness of the shock pad.

Maximum fall heights of the play equipment will determine the thickness of the required sh ock pad.

Wear Surface

Pro-Tect Turf™ wear surface of typically 3/8” – 5/8” thick is designed and installed to meet or exceed guidelines as set by the Consumer Project Safety Commission and the Americans With Disabilities Act (ADA). Pro-Tect Turf ™ demonstrates good to exceptional non -skid characteristics, depending on the troweling methods used.

12.b
Packet Pg. 417
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

4 INSTALLATION

Substrate

Substrate to receive Pro-Tect Turf ™ should be clean asphalt, concrete, wood, tile, brick or compacted sand or aggregate. Substrate to have proper drainage. The proper drainage is defined by the architect or engineer that designed the playground.

Install forming and/or screeds as required. Upon request, T.J. Janca Construction, Inc. can provide pricing and installation o f all substrates, key -ways, curbing, compaction, grading and substrate drainage.

Shock Pad

Mechanically mix the recycled rubber buffings and the urethane resin to the specified resin -to- rubber weight ratios until all rubber particles are 100% covered wit h resin. Chunk rubber may be part of the mix ratio. Place, screed, and hand trowel mixture to the required thickness (1” to

4.5”). Allow between 6 and 18 hours for curing time. Curing time will vary depending on thickness, temperature, and humidity.

NOTE: Pro-Tect Turf™ uses 100% California recycled tires.

Wear Surface

Mechanically mix EPDM or TPV granules and the urethane resin to the specified resin-to-rubber ratios until all rubber granules are 100% covered with resin.

Prime shock pad before placing wear surface to insure proper bonding. Place, screed and hand trowel wear surface to the specif ied thickness (3/8” to 5/8”). Curing time is 12 to 24 hours, depending on weather conditions.

Primer to be applied to all solid substrates and on wear surface edges where splices or color changes occur.

Clean-Up

Upon completion of work, remove all tools, equipment, excess material and debris from site.

Protection

Erect barricades and caution tape as required to prevent inadvertent pedestrian traffic on the finished surface for ±24 hours.

Certain chemicals may cause damage to the playground surface and should be avoided:
disinfectants, concentrated chlorine bleach, gasoline, diesel fuel, oils, acids and organic solvents.

A yellowish/amber shading of the top surface will be noticeable when using standard aromatic polyurethane binder to encaps ulate some colors of EPDM /TPV granules. This is an industry wide design issue.

12.b
Packet Pg. 418
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

5 Color

Pro-Tect Turf ™ is available in basic black, green, beige, red, blue, and a rainbow of colors including teal, purple, gold, brown, orange, and yellow. We can also custo mize colors to meet your specific project requirements.

Maintenance

Pro-Tect Turf™ should be kept free of foreign objects, including dirt, sand, rocks, leaves, etc.

Pro-Tect Turf™ can be blown free of surface debris, vacuumed, hosed off or cleaned with soap, water, and a mild bristle brush.

To maintain proper function and wear, the poured -in-place surfacing requires a regular maintenance program of cleaning to remove dirt, sand, and debris. A regular maintenance program also includes periodic roll coa ts with Aromatic/Aliphatic Urethane to protect surfaces and remove damaging dirt or other substances.

SPECIFICATIONS

Pro-Tect Turf™ meets or exceeds guidelines established by the following:

◼ Americans With Disabilities Act (ADA).

◼ ASTM-F-1292-04, “Standard Specifications for Impact Attenuation of Surface Systems Under and Around Playground Equipment.”

◼ ASTM D412, “Standard Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers -- Tension.”

◼ ASTM D624, “Standard Test Methods for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers.”

◼ ASTM D2047, “Standard Test Methods for Static Coefficient of Friction of Polish - Coated Floor Surfaces as Measured by the James Machine.”

◼ ASTM D2859, “Standard Test Method for Flammability of Finished Textile Floor Covering Materials.”

◼ ASTM E303, “Standard Test Methods for Measuring Surface Frictional Properties Using the British Pendulum Tester.”

◼ ASTM F1951, “Standard Specific ation for Determination of Accessibility of Surface Systems Under and Around Playground Equipment.”

◼ U.S. Consumer Product Safety Commission (CPSC).

◼ MSDS documentation is on file in our offices and available upon request. MSDS documents are provide d to T.J. Janca Construction, Inc. field supervisors for posting on jobsites.

12.b
Packet Pg. 419
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

6 Wear Surface

Granulated Peroxide Cured EPDM colored rubber is bound by an aromatic or aliphatic urethane and troweled into place. Not less than a 2 0% ratio of resin to rubber by weight. Granules are available in .5mm to 3mm.

Thermal Plastic Vulcanized (TPV) colored granules are bound by an aromatic or aliphatic urethane and troweled into place. Not less than a 20% ratio of resin to rubber by weight.

Granules are available in .5mm to 3mm.

Binder & Primer

Resin is an aromatic or aliphatic urethane resin. Primer is aromatic /aliphatic urethane resin thinned to bond the shock pad and wear surface.

12.b
Packet Pg. 420
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

7 PRODUCT DATA

General

• Installed any configuration & dimension.

• Two-layer system – base shock pad is 100%
California recycled raw shredded rubber
buffings/chunk bound by urethane; wear
surface consists of EPDM or TPV colored
rubber granules and urethane.

• Wear surface of typically 3/8” – 5/8”
thickness applied over various thickness of
base shock pad.

• Edges formed on-site as required.

Features

• Durable, dual-density configuration.

• Water permeable.

• Environmentally friendly, low maintenance.

• Customization of colors and designs.

Colors

• Black, green, beige, red, blue, turquoise,
purple, mustard, brown, orange, gray and
yellow.

• Color combination in any ratio available.

Color Consideration

• Standard Colors: Standard red, blue, green,
beige, and black.

• Premium Price Colors: bright red, light blue,
turquoise, purple, orange, bright green, 2
shades of gray, cream, mustard, bright
yellow, pink, brown and other colors upon
request. Refer to color chart.

• Variegated or patterned effect can be
achieved by the mixing of a combination of
colors.

• The combination of black and color(s)
EPDM/TPV diminishes the presence of dirt.

With the larger percentage of black in the
wear course, the lower the price.

Urethane’s Effect on Color

A yellowish or amber shading of the top surface
will be noticeable when using standard aromatic
polyurethane binder to encapsulate some colors
of EPDM /TPV granules. This occurs after
exposure to ultraviolet rays. The shading will
lessen ove r time and use. Alternatively,
aliphatic urethane binder will remain clear.

Aliphatic, a special-order urethane, binder
substantially increases the unit price.

Aliphatic urethane binder is not required with the
base shock pad. To maintain a desired r esult, it
is advisable to use aliphatic binder with certain
colors or color combinations. The yellowish
shading is imperceptible with most colors.

The purpose of using aliphatic binder is for
aesthetic reasons, to enhance the color and/or
designs in the wear course. There is no benefit
in using aliphatic binder with the unexposed
base shock pad.

Edge Details

12.b
Packet Pg. 421
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

8 INSTALLATION OVERVIEW

• A urethane primer is applied to all solid
substrates and on wear surface edges,
where splices or color changes may occur.

• SBR buffings and binder ratio -shall not be
less than 1 4% or more than 16% of total
weight of rubber. The lower percentage for
buffing/chunk combinations.

• The shock pad is hand -troweled at a
consistent density of 29 pounds, 10 ounces
per cubic foot (475 kg/m3) to the specified
thickness for pure buffings.

• Primer is aromatic or aliphatic urethane
resin thinned to bond the shock pad and
wear surface.

• EPDM/TPV bound by aromatic or aliphat ic
urethane—not less than a 2 0% ratio of resin
to rubber by weight.

• Trowel mixture over shock pad at an
application rate of 2.60 lbs. per square foot.

ARCHITECTURAL SPECIFICATIONS

Part I – GENERAL

1.01 DESCRIPTION

Material components and application
synopsis required to install Pro-Tect
Turf™ Poured-In-Place system shall be
provided.

1.02 PERFORMANCE ASSURANCE

A. Poured-in-Place system shall be
warranted by manufacturer for any
defects in material and workmanship for
a period of two yea rs from the date of
installation. Additional warranties are
available.

B. Qualifications

1. The applicator shall be trained and
approved by T. J. Janca Construction,
Inc.

C. Design and Detailing

1. Safety surfacing within playground
equipment use zones shall meet or
exceed the performance requirements
of CPSC, ASTM F 1292 -04, CSA
Z614-98, and ADA guidelines.

2. Pro-Tect Turf™ can be applied over
hard surfaces such as asphalt,
concrete, wood, tile and brick, or
compacted aggregate or sand.

3. Approved applicator will verify that
substrate conditions are suitable for
installation of the playground
surfacing system and will not
proceed with installation until
unsuitable conditions are corrected.

1.03. Submittals

The following shall be submitted:

1. Manufacturer's descriptive date and
installation instructions, including
cleaning and preventative
maintenance.

2. Drawings showing shop details of
the safety surfacing system,
including depths of material, sub -
base m aterials, anchoring systems
and edge details.

3. A list of all materials and
components to be installed as part
of the system, by weight, and/or
volume and recommended
coverage, storage requirements,
and precautions, and shall state
chemical composition and test
results to which material has been
subjected in compliance with these
specifications.

4. A listing of at least five installations
where products similar to those
proposed for use have been
installed and have been in
successful service for a mini mum
period of three years. This list shall
state owner or purchaser, address
of installation, organization, date of
installation, contact person, and
phone number.

5. Sample of safety surface, minimum
of 6 inches x 6 inches (150 mm x
150 mm) proposed for this project.

1.04 Delivery, Storage and Handling

12.b
Packet Pg. 422
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

9 A. Materials and equipment shall be
delivered and stored in accordance with
manufacturer recommendations.

B. Store materials protected from exposure
to harmful environmental conditions and
at a minimum temperature of 40 degrees
F (4 degrees C).

1.05 Job Conditions

A. Install surfacing system when minimum
ambient temperature is 40 degrees F (4
degrees C) or greater with temperatures
remaining equivalent for the next 72
hours.

B. Materials shall be protected from weather
conditions and other damage prior to
installation.

C. Install surfacing system on a dry
subsurface, with no prospect of rain
within the initial drying period, at
temperatures recommended by the
manufacturer.

1.06 Alternates and Allowances

A. System to be considered shall be
approved by the Architect in writing.

PART II - PRODUCTS

2.01 Material components for surfacing
system shall meet requirements of this
specification. The surfacing system shall
be acquired from T. J. Janca
Construction Inc., exclusive distributors
and installers of Pro-Tect Turf™.

2.02 Materials

A. Pro-Tect Turf ™ Primer—Aromatic or
Aliphatic urethane resin.

B. Pro-Tect Turf™ Binder—Binder for safety
surfacing shall be VORAMER MR
products, or equivalent which is
specifically designed for use with rubber
granule material for outdoor installations.

• Binder: Aromatic VORAMER MR
product, by DOW Chemical. -is a
single component polyurethane
prepolymer.

• Binder: Aromatic Urethane
Stobielast® 136 by Stockmeier
Urethanes, USA, Inc.

Binder: Aliphatic Urethane
Stobielast® S -026 by Stockmeier
Urethanes, USA, Inc.

• Binder: Aromatic Urethane
Stobielast® S 1020 by Stockmeier
Urethanes, USA, Inc.

• Binder: Aromatic Urethane Accella
3592 or equivalent by Accella
Polyurethane Systems.

• No toluene diphenel isocyanate (TDI)
shall be used.

• No filler materials shall be used in
urethane such as plasticizers and the
catalyzing agent shall contain no
heavy metals.

• Weight of polyurethane shall be no
less than 8.5 lbs/gal (1.02 Kg/1) and
no more than 9.5 lbs/gal (1.14 Kg/1).
• Installer is permitted to select the blend
of urethane required to match weather
conditions. Substitutions must be equal
to or exceed original quality.

C. Pro-Tect Turf™ black SBR— Strands of
SBR may vary from 0.5 mm - 2.0 mm in
thickness by 3.0 mm - 20 mm in length
and contain less than 4% dust.

• 100% California recycled tires.

• Foam or granular rubber is not be
permitted in substrate.

• The substrate shall be compatible
with the wearing surface and shall
meet requirements herein for impact
attenuation.

D. Pro-Tect Turf™ Wear Surface—surface
shall consist of ethylene propylene
diene monomer (EPDM) or Thermal
Plastic Vulcanized (TPV) granules
particles adhered with polyurethane
binder formulated to produce an even,
uniform surface.

• EPDM/TPV particles shall meet
requirements of ASTM D 412 and

12.b
Packet Pg. 423
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

10 CSA Z614-98 for tensile strength and
elongation.

• ASTM D 2240 (Shore A) hardness of
50-70, not less than 25 percent
rubber hydrocarbons.

• EPDM shall be peroxide cured with
an EPDM content of 26 percent and
shall include a processing aid to
prevent hardness.

• TPV shall be peroxide cured with a
TPV content of 26 percent and shall
include a processing aid to prevent
hardness.

• Size of rubber particles shall be not
less than .5 mm, nor greater than 4.0
mm across.

• Binder shall be not less than 2 0
percent of total weight of rubber used
in the wear surface, and shall provide
100 percent coating of the particles.

• Thickness of wear surface shall be a
minimum 3/8 – 5/8 inch.

• The wear surface shall be porous.

E. Pro-Tect Turf™ Poured-In-Place System

System tested for shock attenuation
under ASTM-F1292-04 G-Max & HIC.

System is non-slip and porous.

System shall have Class B fire rating.

2.03 Technical Requirements

ASTM F2223-04 In Compliance

Compression Endurance No Deterioration
(10,000 cycles w/10 ton load)

Ignition Characteristics In Compliance
(ASTM D2859-02)

Abrasion Resistance 0.3812G Loss
(ASTM D1044)

Skid Resistance 92 dry
(ASTM E303) 52 wet

Flexibility Factor 0-1
(ASTM F147)

Water Permeability: 1.7 ltr/sec/sq. meter

Thermal Stability Range -50 C to +100 C
(-58 F to 212 F)

Freeze/Thaw: No change
(-50 C( -58 F), 40 cycles)

Coefficient of Friction 1.01 dry
(ASTM D2047-04) 0.9 wet

Tensile, psi 200 psi (top surface)
(ASTM D412-98A)

Elongation 173%

Tear Resistance In Compliance
(ASTM D624-00)

PART III - EXECUTION

3.01 Inspection

Prior to installation of Pro-Tect Turf ™
Poured-In-Place System installer will verify
that finished elevations of adjacent areas
are as indicated on the drawings, that the
appropriate sub -grade elevation has
been established for the particular safety
surface to be installed, and that the
subsurface has been installed in a true,
even plane, and sloped to drain as
indicated in drawings.

Tolerance of concrete or bituminous
subsurface shall be within 1/8 inch (3.0
mm) in 10 feet (3050 mm). Tolerance of
aggregate subsurface shall be within 3/8
inch (10 mm) in 10 ft. ( 3050 mm). Verify
that aggregate subsurface has been fully
compacted to 90 percent.

If safety surfacing is to be installed, verify
that concrete subsurface have cured and
that all concrete curing compounds and
other deleterious substances that might
adversely affect adhesion have been
removed. Surface shall be clean and
dry.

Proper drainage is critical to the longevity
of the surfacing system. Inadequate
drainage will cause premature
breakdown of the poured system in
affected areas; and void the warranty.

Verify that sub-surfacing drainage has
been installed to provide positive
drainage.

3.02 INSTALLATION

A. Safety Surface System

12.b
Packet Pg. 424
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

11 Components of the safety surface system
shall be mixed on site in a rotating
tumbler to ensure components are
thoroughly mixed and are in accordance
with manufactures recommendations.

Installation of surfacing shall be
seamless and completely bonded to
subsurface. Material shall cover all
foundations and fill around all elements
penetrating the surface.

B. Substrate

Whenever practical, substrate layer of
surfacing material shall be installed in
one continuous pour on the same day.

When a second pour is required, fully
coat the edge of the previous work with
polyurethane binder to ensure 100
percent bond with new work. Apply
adhesive in small quantities so that new
substrate can be placed before the
adhesive dries.

C. Wear Surface

Wearing surface must be of high quality,
peroxide-cured, virgin EPDM rubber.

Wearing surface shall be bonded to
substrate. Apply adhesive to substrate in
small quantities so that wearing surface
can be applied before adhesive dries.

Surface shall be hand trawled to a
smooth, even finish. Except where
wearing surface is composed of differing
color patterns, pour shall be continuous
and seamless. Where seems are
required due to color change, adjacent
color shall be placed as soon as
possible, before initial pour has c ured.

The edge of initial pour shall be coated
with adhesive and wearing surface
mixture shall be immediately applied.

D. Perimeter

Concrete/asphalt perimeter must be saw
cut to size indicated on plans, or formed
during pour, with surfacing rolled down
inside void. Adhesive must be used in
the void.

E. Thickness

Construction methods, such as use of
measured screeds 1 1/16 inch (1.0 mm)
thicker than the required surfacing depth,
shall be employed to ensure that full
depth of specified su rfacing material is
installed. Surfacing system thickness
throughout the playground equipment
use zone shall be as required to meet the
impact attenuation requirements
specified herein.

F. Clean up

Do not allow adhesive on adjacent
surface. Immediately clean up spills of
excess adhesive.

G. Protection

The synthetic safety surface shall be
allowed to fully cure in accordance with
Manufacturer's instructions. The surface
shall be protected by the owner from all
traffic during the curing period of 48
hours or as instructed by the
manufacturer.

12.b
Packet Pg. 425
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.)

12 Colors and Designs

Pro-Tect Turf™ is available in basic black, green, beige, red, blue, and a rainbow of colors including teal, purple, gol d, brown, orange, and yellow. We can also customize colors to meet your specific project requirements. Custom designs are available.

By definition in the T.J. Janca Construction, Inc. specifications, a “standard” color is:

Red, Blue, Green, Beige

12.b
Packet Pg. 426
Attachment: REV 114719-01_Proposal - Rich Dauer Park Playground Opt3 (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit A-1

EXHIBIT “A”

DAUER PARK PLAYGROUND RENOVATION

SERVICES / SCHEDULE
Vendor will be responsible for the design, provision, and installation of play equipment and surfacing, along with any removal of existing equipment and surfacing.

TIMELINE

 July 1 – September 8, 2025
Play equipment manufacturing lead time (9 weeks)

 September 8 – 19
Site Prep/excavation, concrete curb formation

 September 22 – October 3
Base installation and compaction, Footing layouts to be formed

 October 6 – 17
Installation of Playground Equipment

 October 20 – 22
Installation of Poured In Place Rubber Surfacing

 October 23 – 30
Curing of PIP Surfacing

 November 3
Site Clean Up and Final Walk Through

 November 21
Temporary Fence removal

 November 22
Playground reopening

12.c
Packet Pg. 427
Attachment: Dauer Park Playground Timeline (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

CITY OF COLTON

SHORT FORM CONSTRUCTION CONTRACT

DAUER PARK PLAYGROUND RENOVATION

1. PARTIES AND DATE.

This Contract is made and entered into this 19th day of June, 2025 by and between the City of Colton, a municipal corporation organized under the laws of the State of California with its principal place of business at 650 North La Cadena Drive, Colton, California 92324 , County of San Bernardino, State of California (“City”) and Great Western Installations, Inc., a Corporation, with its principal place of business at 975 S. State Highway 89, Logal, UT 85421 (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. RECITALS.

2.1 City. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing playground equipment purchase, site preparation and installation related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project:

2.3 Project. City desires to engage Contractor to render such services for the DAUER PARK PLAYGROUND RENOVATION (“Project”) as set forth in this Contract.

2.4 Project Documents & Certifications . Contractor has obtained, and delivers concurrently herewith, performance bond, insurance documents and other items as required by the Contract.

3. TERMS

3.1 Incorporation of Documents . This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
• Services/Schedule (Exhibit “A”)
• Plans and Specifications (Exhibit “B”)
• Special Conditions (Exhibit “C”)
• Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”) • Public Works Contractor Registration Certification (Exhibit “E”) • Performance Bonds (Exhibit “F”)
• Federal Requirements (Exhibit “G”)
• Addenda
• Change Orders executed by the City
• 2024 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9

12.d
Packet Pg. 428
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

2 • Contractor’s Bid

3.1.1 Precedence. To the extent there is a conflict between any portions of this Contract, the order of precedence shall be as follows: change orders, special conditions, technical specifications, plans/construction drawings, general contract terms, scope of work, standard plans, advertisements for bid/proposals, bids/proposals or other documents submitted by Contractor.

3.2 Contractor’s Basic Obligation; Scope of Work . Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the “Work”), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject t o, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit “B” attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work . Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion i s approved in advance and in writing by a valid change order executed by the City.

3.2.1.1 Change Orders. Changes to the Contract Time (as defined in Section 3.3) or Total Contract Price shall be in the form of a written Change Order, either signed by both parties or issued unilaterally by the City. No adjustment shall be made to the Contract Time unless th e delay impacts the critical path to completion and the delay was not caused in whole or in part by the Contractor. Failure to timely request a Change Order shall constitute a waiver of any right to adjust the Contract Time or the Total Contract Price. All requests for Change Orders shall be accompanied by detailed supporting documentation, including but not limited to payroll records, invoices, schedules, and any other documentation requested by the City for the purpose of determining the addi tional costs or the impact of any delay. If the change involves Work bid at a unit price, then the Total Contract Price shall be increased at the unit price. If there is no unit price, then the Total Contract Price shall be adjusted to account for costs ac tually incurred plus an allowed mark-up of fifteen percent (15%), which shall constitute the entire amount of profit, mark-ups, field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment id le time for such work. Nothing herein shall prevent the Parties from agreeing to a lump sum cost.
(A) Changes Ordered By City . City may at any time issue a written directive ordering additions, deletions, or changes to the Work. Contractor shall proceed with the work in accordance with the directive. To the extent the directive results in extra work or requires additional Contra ct Time, Contractor shall request a Change Order within seven (7) days of receiving the Work Directive. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined.

12.d
Packet Pg. 429
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

3 (B) Changes Requested By Contractor. With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the potential change within seven (7) days or prior to the alteration of conditions, whichever is earlier. Failure to give notice shall constitute a waiver of Contractor’s right to a change order. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined.

3.2.2 Substitutions/”Or Equal”. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desi red and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain u niform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Con tract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit.

Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the City’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

3.3 Period of Performance and Liquidated Damages . Contractor shall perform and complete all Work under this Contract by DECEMBER 31, 2025, beginning the effective date of the Notice to Proceed (“Contract Time”). Contractor shall perform its Work in strict accordance

12.d
Packet Pg. 430
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

4 with any completion schedule, construction schedule or project milestones developed by the City.

Such schedules or milestones may be included as part of Exhibits “A” or “B” attached hereto, or may be provided separately in writing to Contractor. Contractor agrees that if such Work is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milest ones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of $100 per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract.

3.4 Standard of Performance; Performance of Employees . Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbur sement from the City, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship . City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor sha ll be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 City’s Basic Obligation . City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below - referenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation . As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Contract Price of $514,655.43 Five Hundred, Fourteen Thousand, Six Hundred Fifteen Dollars and Forty-three Cents. (“Total Contract Price ”) provided that such amount shall be subject to adjustment pursuant to the

12.d
Packet Pg. 431
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

5 applicable terms of this Contract or written change orders approved and signed in advance by the City.

3.7.2 Payment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein.

On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.

3.7.3 Prompt Payment . City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Contract Retentions . From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107.

3.7.5 Other Retentions . In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of:
(1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

3.7.6 Substitutions for Contract Retentions . In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pay such monies to Contractor as they come due. Upon satisfactory completion

12.d
Packet Pg. 432
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

6 of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the City has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.

The escrow agreement used for the purposes of this Section shall be in the form provided by the City.

3.7.7 Payment to Subcontractors. Contractor shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 7108.5 of the California Business and Professions Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to Contractor pursuant to this Contract.

3.7.8 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contrac tor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.9 Labor and Material Releases . Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City.

3.8 Labor

3.8.1 Prevailing Wages . Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works ” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at t he project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Cont ractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.8.2 Apprenticeable Crafts . When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon

12.d
Packet Pg. 433
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

7 public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.8.3 Hours of Work . Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one -half (1-1/2) times the basic rate for that worker.

3.8.4 Payroll Records . Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contracto r in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works co ntracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor.

In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the DIR on a weekly basis and in the for mat prescribed by the DIR, which may include electronic submission. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.8.5 Contractor and Subcontractor Registration . Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.8.6 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s

12.d
Packet Pg. 434
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

8 sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affe ct Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and s hall not be compensable by the City.

Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.9 Performance of Work; Jobsite Obligations.

3.9.1 Water Quality Management and Compliance.

3.9.1.1 Water Quality Management and Compliance . Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, withou t limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter -Cologne Water Quality Control Act (Cal Water Code §§ 13000 -14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter -Cologne Water Quality Control Act, to any ground or surface water in the State.

3.9.1.2 Compliance with the Statewide Construction General Permit .

Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor ’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

Without in any way diminishing Contractor's sole responsibility for obtaining coverage under, and complying with, the Permit, the City will use rea sonable efforts to assist Contractor in filing the Notice of Intent when the City's participation is required by the Permit.

3.9.1.3 Other Water Quality Rules , Regulations, and Policies .

Contractor shall comply with the lawful requirements of the Environmental Protection Agency, the State Water Resources Control Board, the Santa Ana Regional Water Quality Control Board, and the City, as well as any other applicable municipality, drainage district, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

12.d
Packet Pg. 435
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

9 3.9.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, hereby acknowledges that it has investigated the risk arising from such waters and assumes any and all risks and liabilities arising therefrom.

3.9.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its directors, officials, officers, employees, volunteers and agents for any alleged violations of this Section

3.9.1.5, including the Permit or any of the laws, rules, regulations and policies provided for herein..

In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor ’s failure to comply with the Permit.

3.9.1.6 Reservation of Right to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City’s attorney ’s fees) associated with, any settlement reached between the City and the relevant enforcement entity.

3.9.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform t he work assigned to them without impacting water quality in violation of the laws, regulations and pol icies described in paragraph 3.9.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.9.1 as they may relate to the Work provided under this Contract.

Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.9.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and life saving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearin g apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.9.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give

12.d
Packet Pg. 436
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

10 all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the publ ic contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.9.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, a City Business License. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City’s applicable business license fee. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.9.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground dur ing the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.9.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, n otify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate.

In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract , but sh all retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.9.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities.

12.d
Packet Pg. 437
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

11 3.9.8 Air Quality.

3.9.8.1 Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel -powered engine. Contractor shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or r egulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.9.8.2 Contractor shall comply, and ensure all subcontractors comply, with all applicable requirements of Title 13, California Code of Regulations Division 3, Chapter 9 (“Regulation”).

3.9.8.3 Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and any subcontractors’ fleet including, without limitation, all Certificates of Reported Compliance, fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

3.9.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9.10 Inspection Of Site . Contractor has visited sites where Work is to be performed and has become acquainted with all conditions affecting the Work. Contractor warrants that it has made such examinations as it deems necessary to determine the condition of the Work sites, its a ccessibility to materials, workmen and equipment, and to determine the Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowances–time or money–will be allowed as to such matters.

3.9.11 Field Measurements. Contractor shall make field measurements, verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing activities.

Errors, inconsistencies or omissions discovered shall be reported to the City immediately and prior to performing any work or altering the condition.

3.10 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a re-inspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain.

12.d
Packet Pg. 438
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

12 Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.11 Claims; Government Code Claim Compliance.

3.11.1 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims.

The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

3.11.2 The following requirements apply to all contracts entered into after January 1, 1991, and all claims to which this section applies:

3.11.2.1 Prerequisites. If any dispute shall arise between the City and Contractor regarding performance of the work, or any alleged change in the work, Contractor shall timely perform the disputed work and shall give written notice of a claim for additional compensation for the work to the City within three (3) days after commencement of the disputed work. Contractor ’s failure to give written notice within the three (3) -day period constitutes an agreement by Contractor that it will receive no extra compensation for the disputed work and shall constitute a waiver of the right to these procedures.

3.11.2.2 Claim Submittal. For purposes of this section, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor’s request for a change has been denied in whole or in part. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failu re to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

3.11.2.3 Supporting Documentation : The Contractor shall submit all claims in the following format:
(1) Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
(2) List of documents relating to claim:
(A) Specifications

12.d
Packet Pg. 439
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

13 (B) Drawings
(C) Clarifications (Requests for Information)
(D) Schedules
(E) Other
(3) Chronology of events and correspondence
(4) Analysis of claim merit
(5) Analysis of claim cost
(6) Time impact analysis in CPM format

3.11.2.4 City’s Response . Upon receipt of a claim pursuant to this section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement. (1) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45 -day period, or extens ion, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
(2) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor.
(3) The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

3.11.2.5 Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand an informal conference to

12.d
Packet Pg. 440
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

14 meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

3.11.2.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement.

Any disputed portion of the claim, as identified by the co ntractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.
(1) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (2) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(3) Unless otherwise agreed to by the City and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(4) The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
(5) If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, inc luding any period of time utilized by the meet and confer conference or mediation.

3.11.2.7 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this section:

12.d
Packet Pg. 441
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

15 (1) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non - binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
(2) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Di scovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(A) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

3.11.2.8 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unres olved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inc lusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

3.11.2.9 City’s Responses. The City’s failure to respond to a claim from the Contractor within the time periods described in this section or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.

3.12 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to

12.d
Packet Pg. 442
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

16 herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this C ontract pursuant to Section 3.18 .3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice.

3.13 Indemnification.

3.13.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, ( collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project or this Contract, including without limitation the payment of all expert witness fees, attorneys’ fees, and other related costs and expenses.

Notwithstanding the foregoing, to the extent required by Civil Cod e section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of t he City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons.

3.13.2 Additional Indemnity Obligations. Contractor shall defend, with counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its of ficials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Contra ctor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall survive expiration or termination of this Contract, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and volunteers.

3.14 Insurance.

3.14.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause.

3.14.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or

12.d
Packet Pg. 443
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

17 damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain t he same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.14.2.1 Minimum Scope of Insurance . Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01) OR Insurance Services Office Owners and Contractors Protective Liability Coverage Form (CG 00 09 11 88) (coverage for operations of designated contractor); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance; and (4) Builders’/All Risk: Builders’/All Risk insurance covering for all risks of loss, including explosion, collapse, underground excavation and removal of lateral support (and including earthquakes and floods if requested by the City). Policies shall not contain exclusions contrary to this Contract, including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 29); or (2) cross liability for claims or suits by one insured against another.

3.14.2.2 Minimum Limits of Insurance . Contractor shall maintain limits no less than: (1) General Liability: $1,000,000 MINIMUM per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used including, but not limited to, form CG 2503, either the general aggregate limit shall apply separately to this Contract/location or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: $1,000,000 MINIMUM per accident for bodily injury and property damage; (3) Workers’ Compensation and Employer’s Liability:

Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 MINIMUM each accident, policy limit bodily injury or disease, and each employee bodily injury or disease; and (4) Builders’/All Risk: Completed value of the project.

Defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.14.2.3 Notices; Cancellation or Reduction of Coverage. At least fifteen (15) days prior to the expiration of any such policy, evidence showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or materially reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. In the event any policy of insurance required under this Contract does not comply with these specifications or is canceled and not replaced, the City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the City will be promptly reimbursed by Contractor or the City may withho ld amounts sufficient to pay premium from Contractor payments. In the alternative, the City may suspend or terminate this Contract.

3.14.3 Insurance Endorsements . The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions to the insurance policies:

12.d
Packet Pg. 444
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

18 3.14.3.1 General Liability. The general liability policy shall include or be endorsed (amended) to state that: (1) using ISO CG forms 20 10 and 20 37, or endorsements providing the exact same coverage, the City of Colton, its directors, officials, officers, employees, agents and volu nteers shall be covered as additional insureds with respect to the Services or ongoing and completed operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; and (2) using ISO form 20 01, or endorsements providing the exact same coverage, the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbr oken chain of coverage excess of Contractor’s scheduled underlying coverage. Any excess insurance shall contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City, before the City’s own primary insurance or self -insurance shall be called upon to protect it as a named insured. Any insurance or self -insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties require d to be named as additional insureds pursuant to this Section

3.14.3.1. 3.14.3.2 Automobile Liability. (1) The City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self -insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall n ot be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be n amed as additional insureds pursuant to this Section 3.14.3.2.

3.14.3.3 Workers’ Compensation and Employer ’s Liability Coverage .

The insurer shall agree to waive all rights of subrogation against the City, its directors, officials, officers, employees, agents and volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.14.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days (10 days for nonpayment of premium) prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.

Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officials, officers, employees, agents and volunteers, or any other additional insureds.

3.14.4 Builders’/All Risk Policy Requirements. The builders’/all risk insurance shall provide that the City be named as loss payee. In addition, the insurer shall waive all rights of subrogation against the City.

12.d
Packet Pg. 445
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

19 3.14.5 Separation of Insureds; No Special Limitations; Waiver of Subrogation.

All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents and volunteers. All policies shall waive any right of subrogation of the insurer against the City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, and shall require similar written express waivers and insurance clauses from each of its subcontractors.

3.14.6 Professional Liability Insurance. All architects, engineers, consultants or design professionals retained by Contractor shall also procure and maintain, for a period of five (5) years following completion of the Contract, errors and omissions liability insurance with a limit of not less than $1,000,000 per occurrence. This insurance shall name the City, its directors, officials, officers, employees, agents and volunteers as additional and insureds with respect to Work performed, and shall otherwise comply with all requirements of this Section. Defense costs shall be paid in addition to the limits.

3.14.7 Deductibles and Self -Insurance Retentions . Any deductibles or self - insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self- insured retentions as respects the City, its directors, officials, officers, employees, agents and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.14.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VIII, licensed to do business in California, and satisfactory to the City.

3.14.9 Verification of Coverage . Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reser ves the right to require complete, certified copies of all required insurance policies, at any time.

3.14.10 Subcontractors. Contractor shall not allow any subcontractors to commence work on any subcontract relating to the work under the Contract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. If requested by Contractor, the City may approve different scopes or minimum limits of insurance for particular subcontractors. The Contractor and the City shall be named as additional insureds on all subcontractors’ policies of Commercial General Liability using ISO form 20 38, or coverage at least as broad. In addition, Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor.

All coverages for subcontractors shall be subject to all of the requirements stated herein.

3.14.11 Reporting of Claims. Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

12.d
Packet Pg. 446
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

20 3.15 Bond Requirements.

3.15.1 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.2 Performance Bond . If specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.3 Bond Provisions . Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the C ontract for cause.

3.15.4 Surety Qualifications . Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.16 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non -conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work.

Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal,

12.d
Packet Pg. 447
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

21 replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, wheth er express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor ’s sole expense.

Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.17 Employee/Labor Certifications.

3.17.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contrac t as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.17.2 Equal Opportunity Employment . Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.17.3 Verification of Employment Eligibility . By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Ac t of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same. The City shall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for in Section 3.17 or any of its sub-sections.

3.18 General Provisions.

3.18.1 City’s Representative. The City hereby designates the Deb Farrar, Community Services Director, or their designee, to act as its representative for the performance of this Contract ( “City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.18.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City (“′Contractor’s Representative”). Following approval by the City, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor ’s Representative shall

12.d
Packet Pg. 448
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

22 supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Co ntractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontract or of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s Representative, Contractor shall provide the information specified above and obtain the City’s written approval.

3.18.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate th is Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offse t City’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, ma terials or other matter prepared or built by Contractor in connection with its performance of this Contract.

Contractor shall be required to provide such document and other information within fifteen (15) days of the request. The City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Contractor shall not be entitled to payment for unperformed Work, including, without limitation, any overhead and profit on the portion of t he Work that is terminated and shall not be entitled to damages or compensation of any kind or nature for termination of Work.

3.18.4 Contract Interpretation . Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City’s Representative, whose decision shall be binding upon Contractor.

3.18.5 Anti-Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Profess ions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties.

12.d
Packet Pg. 449
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

23 3.18.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

CONTRACTOR:

GREAT WESTER INSTALLATIONS, INC
975 S. STATE HYW 89
LOGAN, UT 84321
ATTN: MYLES HARVEY

CITY:

CITY OF COLTON
650 NORTH LA CADENA DRIVE
COLTON, CA 92324
ATTN: DEB FARRAR
Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.18.7 Time of Essence . Time is of the essence in the performance of this Contract.

3.18.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.18.9 No Third Party Beneficiaries . There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.18.10 Laws, Venue. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of San Bernardino, State of California.

3.18.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.18.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

12.d
Packet Pg. 450
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

24 3.18.13 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability.

3.18.14 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Work.

3.18.15 Certification of License.

3.18.15.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.18.15.2 Contractors are required by law to be licensed and regulated by the Contractors ’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.18.16 Authority to Enter Contract . Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.18.17 Entire Contract; Modification . This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.18.18 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.18.19 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects.

12.d
Packet Pg. 451
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

25 3.18.20 Federal Provisions. When funding for the Work is provided, in whole or in part, by an agency of the federal government, Contractor shall also fully and adequately comply with the p rovisions included in Exhibit “G” (Federal Requirements) attached hereto and incorporated herein by reference (“Federal Requirements”). With respect to any conflict between such Federal Requirements and the terms of this Contract and/or the provisions of state law, the more stringent requirement shall control.
[Signatures on Next Page]

12.d
Packet Pg. 452
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

26 SIGNATURE PAGE FOR CONSTRUCTION CONTRACT

BETWEEN THE CITY OF COLTON
AND INNOVATIVE PLAYGROUNDS CO.

IN WITNESS WHEREOF, the Parties have entered into this Contract as of the 19TH day of June, 2025.

CITY OF COLTON INNOVATIVE PLAYGROUNDS CO., INC

By: ____________________________ By: _________________________ WILLIAM R. SMITH

CITY MANAGER CEO

Attest:

____
ISAAC T. SUCHIL
City Clerk

_______________________________
Contractor’s License Number/Classification

_______________________________
DIR Registration Number

Approved as to Form:

______________________________
Best Best & Krieger LLP
City Attorney

12.d
Packet Pg. 453
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit A-1

EXHIBIT “A”

DAUER PARK PLAYGROUND RENOVATION

SERVICES / SCHEDULE
Vendor will be responsible for the design, provision, and installation of play equipment and surfacing, along with any removal of existing equipment and surfacing.

TIMELINE

• July 1 – September 8, 2025
Play equipment manufacturing lead time (9 weeks)

• September 8 – 19
Site Prep/excavation, concrete curb formation

• September 22 – October 3
Base installation and compaction, Footing layouts to be formed

• October 6 – 17
Installation of Playground Equipment

• October 20 – 22
Installation of Poured In Place Rubber Surfacing

• October 23 – 30
Curing of PIP Surfacing

• November 3
Site Clean Up and Final Walk Through

• November 21
Temporary Fence removal

• November 22
Playground reopening

12.d
Packet Pg. 454
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit B-1

EXHIBIT “B”

PLANS AND SPECIFICATIONS
GREAT WESTER INSTALLATIONS, INC, OPTION 3

12.d
Packet Pg. 455
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit C-1

EXHIBIT “C”

SPECIAL CONDITIONS
ARTICLE 1. BONDS
Concurrently with this Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond shall be for one hundred percent (100%) of the Total Contract Price.

12.d
Packet Pg. 456
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit D-1

EXHIBIT “D”

CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

GREAT WESTERN INSTALLATIONS, INC

By: _________________________
Signature
_________________________
Name (Print)
_________________________
Title (Print)

12.d
Packet Pg. 457
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit E-1

EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor ’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.1
Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:__________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:

1. Contractor shall maintain a current DIR registration for the duration of the project.

2. Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor:____________________
Signature:

Name and Title:

Dated:

1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

12.d
Packet Pg. 458
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-1

EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

12.d
Packet Pg. 459
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-2

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Colton (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements i n the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during w hich time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfull y fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety ’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:

12.d
Packet Pg. 460
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-3

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contra ct price ” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price ” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount pr eviously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

Remainder of This Page is Intentionally Left Blank

12.d
Packet Pg. 461
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-4

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title

(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Principal and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)

(Name and Address of Agent or
Representative for service of
process in California, if different
from above)

(Telephone number of Surety
and Agent or Representative for
service of process in California)

12.d
Packet Pg. 462
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-5

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

12.d
Packet Pg. 463
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-6

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Colton (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20 ____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW, THEREFORE, we, the Principal and __________________________, a corporation organized and existing under the laws of the State of _______________ and authorized to transact surety business under the laws of the State of California as Surety, are held and firmly bound unto City in the sum of ______________ Dollars ($___________) lawful money of the United States of America, the sum not being less than One Hundred Percent (100%) of the total amount of the Contract, for the payment of which sum well and tr uly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials , provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or

12.d
Packet Pg. 464
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-7

released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such cha nge, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

The Remainder of this Page is Intentionally Left Blank

12.d
Packet Pg. 465
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-8

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title

(Corporate Seal) Surety
By

Attorney-in-Fact
Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THE FOLLOWING INFORMATION IS MANDATORY
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

12.d
Packet Pg. 466
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit F-9

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity up on behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

12.d
Packet Pg. 467
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.) 23152.04000\42402756.1

Exhibit G-1

EXHIBIT “G”

FEDERAL REQUIREMENTS

NOT APPLICABLE

12.d
Packet Pg. 468
Attachment: CONTRACT - Great Western Dauer Park Playground Renovation (4987 : Contract Award - Great Western Installations, Inc.)

ITEM NO. 13

STAFF REPORT

DATE: JUNE 17, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: CHAD BLAIS, PUBLIC WORKS AND UTILITY SERVICES

DIRECTOR
SUBJECT: APPROVE THE AWARD OF CONTRACT TO LC PAVING &
SEALING, INC. FOR THE WEST COLTON BIKE LANE PROJECT
FOR THE AMOUNT OF $1,978,522.00, RESOLUTION NO. R-53-25.

RECOMMENDED ACTION

Staff recommends that the City Council take the following action:

Staff recommends that the City Council take the following action:

1. Authorize the award of contract for the West Colton Bike Lane Project to LC Paving & Sealing, Inc. as the lowest responsive and responsible bidder in the amount of $1,978,522 and authorize the City Manager to execute the contract agreement.

2. Approve Resolution R-53-25 (Exhibit C) to amend FY 24/25 Capital Improvement Budget.

BACKGROUND

On March 21, 2019, the City of Colton received notification that the California Transportation Commission (CTC) approved the allocation of ATP funding for the Project Approval/Environmental Document (PA/ED) Phase of the West Colton Class I Bicycle and Pedestrian Path Project. The project is located along an unimproved corridor from John Juarez Way to Eucalyptus Avenue, and Eucalyptus Avenue from San Bernardino Avenue and Randall Avenue. The Project is in the vicinity of Garcia Elementary School, Jehue Middl e School and Morris Elementary School. The project scope include s installation of bike lanes and sidewalks, signalize crossing at Pepper Avenue, striping and signs, irrigation and landscaping, and lighting.

The bike route will be Class II buffered bike lane (with plastic bollard) along Meridian Ave., 13 Packet Pg. 469
Staff Report to the Mayor and City Council
Contract Award - LC Paving & Sealing, Inc.

June 17, 2025

Page 2 ends

Pepper Ave., Eucalyptus Ave, San Bernardino Ave. and Randall Ave. Class II buffered bike lanes provides 2 to 3 feet separation from vehicle lanes.

ISSUES/ANALYSIS

In accordance with Colton Municipal Code (CMC) Section 3.08.090, a request for Notice Inviting Formal Bids was published in The Press Enterprise on May 4, 2025 and May 11, 2025.

Bids were opened on May 22, 2025, and staff received the following bids:

Contractor Bid Amount
LC Paving & Sealing, Inc. $ 1,978,420.00
DM Contracting, Inc. $ 2,064,420.80
Van Engineering $ 2,480,410.80

Staff reviewed and evaluated submitted bids and recommend s awarding the contract (Exhibit B) for the West Colton Bike Lane Project to LC Paving & Sealing, Inc. as the lowest responsive and responsible bidder in the amount of $1,978,420.00.

FISCAL IMPACTS

On March 25, 2025, and on April 29, 2025, the City received ATP funding in the amount of $29,000.00 and $2,079,000.00 respectively , for a total funding amount of $2,108,00.00 (see Exhibit X). The local match required is $110,054.40 and it will be funded by the Local Traffic Impact Fund.

Adoption of RESOLUTION NO. R -53-25 will increase revenues and appropriations to accept the additional ATP funding and appropriate from reserve balance in the Traffic Impact Fund for the City’s required local match. Upon adoption of the budget resolution, there will be sufficient appropriations in the FY2024 -25 budget for the contract award for construction of the West Colton Bike Lane Project.

Funding Account No. Current
Balance
New Funding
per R-53-25
Total
Funding
Contract
Amount
ATP 225-2026-6150-
3890-0000-000 $0 $2,108,000.00 $2,108,000.00 $1,878,522.00 Traffic
Impact
Fund
249-2347-6150-
3890-0000-000 $66,444.00 $110,054.40 $176,494.40 $100,000.00 Total $2,218,054.40 $2,284,494.40 $1,978,522.00

ALTERNATIVES

13 Packet Pg. 470
Staff Report to the Mayor and City Council
Contract Award - LC Paving & Sealing, Inc.

June 17, 2025

Page 3 ends

1. Provide alternative direction to staff.

ATTACHMENT

1. Exhibit A - Plans

2. Exhibit B - Contract

3. Exhibit C- Resolution 53-25

4. Exhibit D - Funding Finance Letter
13 Packet Pg. 471
LEGEND
ABBREVIATIONS:

PROJECT SITE

VICINITY MAP

LOCATION MAP

PROJECT
SITE
Know what'sbelow.
before you dig.Call
R
23 STREET IMPROVEMENT NOTES

CONTRACTOR'S RESPONSIBILITY FOR SAFETYENGINEER'S NOTICE TO CONTRACTOR “
”
“”
“”
’”
–
’

BASIS OF BEARINGS
1 SHEET INDEX
OWNER
GAS

PUBLIC SERVICE AGENCIES

WATER/SEWER

COMMUNICATION

ELECTRIC
04/30/25

13.a
Packet Pg. 472
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
DDDD
D
D
D
D
D
D
D
D
D Y
H
D Y
H
D YH
D
YH D

YH D YH
D YH
D
YH
D Y
H
D
D
D Y
H
D
D Y
H D
D
Y
H
D Y
H
D YH
D
YH
D
D
D
D Y
H
D
D YH
D YH
D Y
H
D
Y
H
D
YH
D Y
H
D
D YH
D
YH
D
Y
H
D
YH
D
YH
D
D D
D YH
D
YH
D
YH
D Y
H
SHEET 11 - SS SHEET 11 - SS SHEET 12 - SS SHEET 12 - SS SHEET 13 - SS SHEET 13 - SS SHEET 14 - SS SHEET 14 - SS SHEET 15 - SS SHEET 16 - SS SHEET 16 - SS SHEET 17 - SS SHEET 17 - SS SHEET 18 - SS SHEET 6 - ST
SHEET 19 - SS
SHEET 15 - SS
SHEET 7 - ST
SHEET 7 - ST
SHEET 8 - ST
SHEET 18 - SS
SHEET 6 - ST
SHEET 19 - SS
SHEET 20 - SS
SHEET 20 - SS
SHEET 9 - STSHEET 21 - SS
SHEET 22 - SS
SHEET 22 - SS
SHEET 5 - DM
SEE PLANNO. 1358-1
2 Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N

INDEX MAP
04/30/25

13.a
Packet Pg. 473
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) 3 Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N

PROPOSED CROSS SECTIONPROPOSED CROSS SECTIONPROPOSED CROSS SECTIONPROPOSED CROSS SECTION PROPOSED CROSS SECTION

PROPOSED CROSS SECTION

COBBLESTONE DETAIL

DEMOLITION NOTES & QUANTITY ESTIMATES CONSTRUCTION NOTES & QUANTITY ESTIMATESIGNING AND STRIPING NOTES & QUANTITY ESTIMATE 04/30/25

13.a
Packet Pg. 474
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
4 Know what'sbelow.
before you dig.Call
R
23 DETAIL "B"

SAN BERNARDINO AVENUEPEPPER AVENUE
DETAIL "A"

SAN BERNARDINO AVENUE

PEPPER AVENUE
DETAIL "C"

SAN BERNARDINO AVENUE

PEPPER AVENUE
DETAIL "D"

SAN BERNARDINO AVENUEPEPPER AVENUE

CONSTRUCTION NOTES
04/30/25

13.a
Packet Pg. 475
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
D
Y
H
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 476
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
D
D
YH
DD
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 477
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D
D
D
D
YH
D
D
D
YH
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 478
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 479
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) Know what'sbelow.
before you dig.Call
R
23 D
YH
D
YH
04/30/25

13.a
Packet Pg. 480
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.)

STANDARD PLACEMENT
DETAIL

PHASE DIAGRAM

CONDUCTOR SCHEDULE

POLE SCHEDULE

CONSTRUCTION NOTESCONSTRUCTION NOTESCONSTRUCTION NOTESCONSTRUCTION NOTESCONSTRUCTION NOTESCONSTRUCTION NOTES

TRAFFIC SIGNAL GENERAL NOTES
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
LEGEND
04/30/25

13.a
Packet Pg. 481
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D YH D
D YH
D YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 482
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D YH
D YH
D YH

EROSION CONTROL OPTIONEROSION CONTROL OPTION

EROSION CONTROL OPTION
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 483
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D YH
D
D D
D YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 484
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D YH
D YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 485
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D
D
D
D YH
D
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 486
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D
D
D YH
D YH
D YH
D YH
D
D
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 487
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D YH
D YH
D YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 488
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
D
D
YH
D YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25
04/30/25

13.a
Packet Pg. 489
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) DD
D
YH
D
D
D
D
D
YH
D
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 490
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D
YH
D
YH
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 491
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
D
Y
H
D
YH
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 492
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 493
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) D
YH
D
YH
Know what'sbelow.
before you dig.Call
R
23 P R E L I M I N A R Y

N O T F O R

C O N S T R U C T I O N
04/30/25

13.a
Packet Pg. 494
Attachment: Exhibit A - Plans (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

CITY OF COLTON

SHORT FORM CONSTRUCTION CONTRACT

WEST COLTON BIKE LANE PROJECT

1. PARTIES AND DATE.

This Contract is made and entered into this 17th day of June, 2025 by and between the City of Colton, a municipal corporation organized under the laws of the State of California with its principal place of business at 650 North La Cadena Drive, Colton, California 92324 , County of San Bernardino, State of California (“City”) and LC Paving & Sealing, Inc. , a Corporation with its principal place of business at 620 Alpine Way, Escondido, CA 92029 (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. RECITALS.

2.1 City. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing installation of traffic signal pole and equipment, PCC curb ramps, sidewalk and curb & gutter realignment, AC pavement, traffic signage, pavement striping and markings per plan no. 1374-1 related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project:

Class “A”.

2.3 Project. City desires to engage Contractor to render such services for the West Colton Bike Lane Project (“Project”) as set forth in this Contract.

2.4 Project Documents & Certifications . Contractor has obtained, and delivers concurrently herewith, PERFORMANCE BOND, PAYMENT BOND, INSURANCE DOCUMENTS AND OTHER CERTIFICATIONS as required by the Contract.

3. TERMS

3.1 Incorporation of Documents . This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
• Services/Schedule (Exhibit “A”)
• Plans and Specifications (Exhibit “B”)
• Special Conditions (Exhibit “C”)
• Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”) • Public Works Contractor Registration Certification (Exhibit “E”) • Payment and Performance Bonds (Exhibit “F”)
• Federal Requirements (Exhibit “G”)
• Addenda
• Change Orders executed by the City

13.b
Packet Pg. 495
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

2 • 2024 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
• Notice Inviting Bids, if any
• Instructions to Bidders, if any
• Contractor’s Bid

3.1.1 Precedence. To the extent there is a conflict between any portions of this Contract, the order of precedence shall be as follows: change orders, special conditions, technical specifications, plans/construction drawings, general contract terms, scope of work, standard plans, advertisements for bid/proposals, bids/ proposals or other documents submitted by Contractor.

3.2 Contractor’s Basic Obligation; Scope of Work . Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the “Work”), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject t o, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit “B” attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work . Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion i s approved in advance and in writing by a valid change order executed by the City.

3.2.1.1 Change Orders. Changes to the Contract Time (as defined in Section 3.3) or Total Contract Price shall be in the form of a written Change Order, either signed by both parties or issued unilaterally by the City. No adjustment shall be made to the Contract Time unless the delay impacts the critical path to completion and the delay was not caused in whole or in part by the Contractor. Failure to timely request a Change Order shall constitute a waiver of any right to adjust the Contract Time or the Total Contract Price. All requests for Change Orders shall be accompanied by detailed supporting documentation, including but not limited to payroll records, invoices, schedules, and any other documentation requested by the City for the purpose of determining the additional costs or the impact of any delay. If the change involves Work bid at a unit price, then the Total Contract Price shall be increased at the unit price. If there is no unit price, then the Total Contract Price s hall be adjusted to account for costs ac tually incurred plus an allowed mark-up of fifteen percent (15%), which shall constitute the entire amount of profit, mark-ups, field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment id le time for such work. Nothing herein shall prevent the Parties from agreeing to a lump sum cost.
(A) Changes Ordered By City . City may at any time issue a written directive ordering additions, deletions, or changes to the Work. Contractor shall proceed with the work in accordance with the directive. To the extent the directive results in extra work or requires additional Contra ct Time, Contractor shall request a Change Order within seven (7) days of receiving the Work Directive. If any costs are not capable of being determined within

13.b
Packet Pg. 496
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

3 seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. (B) Changes Requested By Contractor. With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the potential change within seven (7) days or prior to the alteration of conditions, whichever is earlier. Failure to give notice shall constitute a waiver of Contractor’s right to a change order. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined.

3.2.2 Substitutions/”Or Equal ”. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprieta ry name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Con tract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal ” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit.

Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the City’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

13.b
Packet Pg. 497
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

4 3.3 Period of Performance and Liquidated Damages. Contractor shall perform and complete all Work under this Contract within 120 days, beginning the effective date of the Notice to Proceed ( “Contract Time”). Contractor shall perform its Work in strict accordance with any completion schedule, construction schedule or project milestones developed by the City. Such schedules or milestones may be included as part of Exhibits “A” or “B” attached hereto, or may be provided separately in writing to Contractor. Contractor agrees that if such W ork is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of Five-Hundred Dollars ($500) per day for each and every calendar day of delay beyond the Contract Time or beyo nd any completion schedule, construction schedule or Project milestones established pursuant to the Contract.

3.4 Standard of Performance; Performance of Employees . Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbur sement from the City, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship . City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor sha ll be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 City’s Basic Obligation . City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below - referenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation . As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Contract Price of One-Million Nine

13.b
Packet Pg. 498
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

5 Hundred Seventy Eight Thousand Five -Hundred Twenty-Two Dollars ($ 1,978,522.00) (“Total Contract Price ”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the City.

3.7.2 Payment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein.

On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.

3.7.3 Prompt Payment . City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Contract Retentions . From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107.

3.7.5 Other Retentions . In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of:
(1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

3.7.6 Substitutions for Contract Retentions . In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the

13.b
Packet Pg. 499
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

6 City, or with a state or federally chartered bank in California as the escrow agent, and thereafter the City shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the City has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.

The escrow agreement used for the purposes of this Section shall be in the form provided by the City.

3.7.7 Payment to Subcontractors. Contractor shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 7108.5 of the California Business and Professions Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to Contractor pursuant to this Contract.

3.7.8 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it w ill not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.9 Labor and Material Releases . Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City.

3.8 Labor

3.8.1 Prevailing Wages . Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works ” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at t he project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Cont ractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

13.b
Packet Pg. 500
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

7 3.8.2 Apprenticeable Crafts . When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The pri mary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.8.3 Hours of Work . Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one -half (1-1/2) times the basic rate for that worker.

3.8.4 Payroll Records . Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contracto r in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works co ntracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor.

In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the DIR on a weekly basis and in the for mat prescribed by the DIR, which may include electronic submission. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.8.5 Contractor and Subcontractor Registration . Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached h ereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

13.b
Packet Pg. 501
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

8 3.8.6 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole r esponsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City.

Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.9 Performance of Work; Jobsite Obligations.

3.9.1 Water Quality Management and Compliance.

3.9.1.1 Water Quality Management and Compliance . Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, withou t limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter -Cologne Water Quality Control Act (Cal Water Code §§ 13000 -14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter -Cologne Water Quality Control Act, to any ground or surface water in the State.

3.9.1.2 Compliance with the Statewide Construction General Permit .

Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor ’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

Without in any way diminishing Contractor's sole responsibility for obtaining coverage under, and complying with, the Permit, the City will use rea sonable efforts to assist Contractor in filing the Notice of Intent when the City's participation is required by the Permit.

3.9.1.3 Other Water Quality Rules , Regulations, and Policies .

Contractor shall comply with the lawful requirements of the Environmental Protection Agency, the State Water Resources Control Board, the Santa Ana Regional Water Quality Control Board, and the City, as well as any other applicable municipality, drainage district, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

13.b
Packet Pg. 502
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

9 3.9.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, hereby acknowledges that it has investigated the risk arising from such waters and assumes any and all risks and liabilities arising therefrom.

3.9.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its directors, officials, officers, employees, volunteers and agents for any alleged violations of this Section

3.9.1.5, including the Permit or any of the laws, rules, regulations and policies provided for herein..

In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor ’s failure to comply with the Permit.

3.9.1.6 Reservation of Right to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City’s attorney ’s fees) associated with, any settlement reached between the City and the relevant enforcement entity.

3.9.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform t he work assigned to them without impacting water quality in violation of the laws, regulations and pol icies described in paragraph 3.9.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.9.1 as they may relate to the Work provided under this Contract.

Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.9.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and life saving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearin g apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.9.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give

13.b
Packet Pg. 503
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

10 all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the publ ic contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.9.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, a City Business License. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City’s applicable business license fee. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.9.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground dur ing the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.9.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, n otify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate.

In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract , but sh all retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.9.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities.

13.b
Packet Pg. 504
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

11 3.9.8 Air Quality.

3.9.8.1 Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considere d by SCAQMD and CARB to include any item of equipment with a fuel -powered engine. Contractor shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.9.8.2 Contractor shall comply, and ensure all subcontractors comply, with all applicable requirements of Title 13, California Code of Regulations Division 3, Chapter 9 (“Regulation”).

3.9.8.3 Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and any subcontractors’ fleet including, without limitation, all Certificates of Reported Compliance, fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

3.9.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9.10 Inspection Of Site . Contractor has visited sites where Work is to be performed and has become acquainted with all conditions affecting the Work. Contractor warrants that it has made such examinations as it deems necessary to determine the condition of the Work sites, its a ccessibility to materials, workmen and equipment, and to determine the Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowances–time or money–will be allowed as to such matters.

3.9.11 Field Measurements. Contractor shall make field measurements, verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing activities.

Errors, inconsistencies or omissions discovered shall be reported to the City immediately and prior to performing any work or altering the condition.

3.10 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a re-inspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain.

13.b
Packet Pg. 505
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

12 Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.11 Claims; Government Code Claim Compliance.

3.11.1 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims.

The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

3.11.2 The following requirements apply to all contracts entered into after January 1, 1991, and all claims to which this section applies:

3.11.2.1 Prerequisites. If any dispute shall arise between the City and Contractor regarding performance of the work, or any alleged change in the work, Contractor shall timely perform the disputed work and shall give written notice of a claim for additional compensation for the work to the City within three (3) days after commencement of the disputed work. Contractor ’s failure to give written notice within the three (3) -day period constitutes an agreement by Contractor that it will receive no extra compensation for the disputed work and shall constitute a waiver of the right to these procedures.

3.11.2.2 Claim Submittal. For purposes of this section, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor’s request for a change has been denied in whole or in part. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed c onditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

3.11.2.3 Supporting Documentation : The Contractor shall submit all claims in the following format:
(1) Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
(2) List of documents relating to claim:
(A) Specifications

13.b
Packet Pg. 506
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

13 (B) Drawings
(C) Clarifications (Requests for Information)
(D) Schedules
(E) Other
(3) Chronology of events and correspondence
(4) Analysis of claim merit
(5) Analysis of claim cost
(6) Time impact analysis in CPM format

3.11.2.4 City’s Response . Upon receipt of a claim pursuant to this section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement. (1) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45 -day period, or extens ion, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
(2) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor.
(3) The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

3.11.2.5 Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand an informal conference to

13.b
Packet Pg. 507
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

14 meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

3.11.2.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement.

Any disputed portion of the claim, as identified by the co ntractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.
(1) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (2) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(3) Unless otherwise agreed to by the City and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(4) The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
(5) If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, inc luding any period of time utilized by the meet and confer conference or mediation.

3.11.2.7 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this section:

13.b
Packet Pg. 508
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

15 (1) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non - binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
(2) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(A) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

3.11.2.8 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolv ed claims unless a new unrelated claim arises after the Government Code claim is submitted.

3.11.2.9 City’s Responses. The City’s failure to respond to a claim from the Contractor within the time periods described in this section or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.

3.12 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to

13.b
Packet Pg. 509
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

16 herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this C ontract pursuant to Section 3.18 .3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice.

3.13 Indemnification.

3.13.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, ( collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project or this Contract, including without limitation the payment of all expert witness fees, attorneys’ fees, and other related costs and expenses.

Notwithstanding the foregoing, to the extent required by Civil Cod e section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of t he City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons.

3.13.2 Additional Indemnity Obligations. Contractor shall defend, with counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its of ficials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Contra ctor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall survive expiration or termination of this Contract, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and volunteers.

3.14 Insurance.

3.14.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause.

3.14.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or

13.b
Packet Pg. 510
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

17 damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain t he same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.14.2.1 Minimum Scope of Insurance . Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01) OR Insurance Services Office Owners and Contractors Protective Liability Coverage Form (CG 00 09 11 88) (coverage for operations of designated contractor); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance; and (4) Builders’/All Risk: Builders’/All Risk insurance covering for all risks of loss, including explosion, collapse, underground excavation and removal of lateral support (and including earthquakes and floods if requested by the City). Policies shall not contain exclusions contrary to this Contract, including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 29); or (2) cross liability for claims or suits by one insured against another.

3.14.2.2 Minimum Limits of Insurance . Contractor shall maintain limits no less than: (1) General Liability: $1,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used including, but not limited to, form CG 2503, either the general aggregate limit shall apply separately to this Contract/location or the general aggregate limit shall be twice the required occurrence limit ; (2) Automobile Liability: $1,000,000 per accident for bodily injury and property damage; (3) Workers’ Compensation and Employer ’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease; and (4) Builders’/All Risk: Completed value of the project. Defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.14.2.3 Notices; Cancellation or Reduction of Coverage. At least fifteen (15) days prior to the expiration of any such policy, evidence showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or materially reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. In the event any policy of insurance required under this Contract does not comply with these specifications or is canceled and not replaced, the City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the City will be promptly reimbursed by Contractor or the City may withho ld amounts sufficient to pay premium from Contractor payments. In the alternative, the City may suspend or terminate this Contract.

3.14.3 Insurance Endorsements . The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions to the insurance policies:

13.b
Packet Pg. 511
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

18 3.14.3.1 General Liability. The general liability policy shall include or be endorsed (amended) to state that: (1) using ISO CG forms 20 10 and 20 37, or endorsements providing the exact same coverage, the City of Colton, its directors, officials, officers, employees, agents and volu nteers shall be covered as additional insureds with respect to the Services or ongoing and completed operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; and (2) using ISO form 20 01, or endorsements providing the exact same coverage, the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbr oken chain of coverage excess of Contractor’s scheduled underlying coverage. Any excess insurance shall contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City, before the City’s own primary insurance or self -insurance shall be called upon to protect it as a named insured. Any insurance or self -insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties require d to be named as additional insureds pursuant to this Section

3.14.3.1. 3.14.3.2 Automobile Liability. (1) The City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self -insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall n ot be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be n amed as additional insureds pursuant to this Section 3.14.3.2.

3.14.3.3 Workers’ Compensation and Employer ’s Liability Coverage .

The insurer shall agree to waive all rights of subrogation against the City, its directors, officials, officers, employees, agents and volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.14.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days (10 days for nonpayment of premium) prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.

Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officials, officers, employees, agents and volunteers, or any other additional insureds.

3.14.4 Builders’/All Risk Policy Requirements. The builders’/all risk insurance shall provide that the City be named as loss payee. In addition, the insurer shall waive all rights of subrogation against the City.

13.b
Packet Pg. 512
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

19 3.14.5 Separation of Insureds; No Special Limitations; Waiver of Subrogation.

All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents and volunteers. All policies shall waive any right of subrogation of the insurer against the City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, and shall require similar written express waivers and insurance clauses from each of its subcontractors.

3.14.6 Professional Liability Insurance. All architects, engineers, consultants or design professionals retained by Contractor shall also procure and maintain, for a period of five (5) years following completion of the Contract, errors and omissions liability insurance with a limit of not less than $1,000,000 per occurrence. This insurance shall name the City, its directors, officials, officers, employees, agents and volunteers as additional and insureds with respect to Work performed, and shall otherwise comply with all requirements of this Section. Defense costs shall be paid in addition to the limits.

3.14.7 Deductibles and Self -Insurance Retentions . Any deductibles or self - insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self- insured retentions as respects the City, its directors, officials, officers, employees, agents and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.14.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VIII, licensed to do business in California, and satisfactory to the City.

3.14.9 Verification of Coverage . Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commenc es. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.14.10 Subcontractors. Contractor shall not allow any subcontractors to commence work on any subcontract relating to the work under the Contract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. If requested by Contractor, the City may approve different scopes or minimum limits of insurance for particular subcontractors. The Contractor and the City shall be named as additional insureds on all subcontractors’ policies of Commercial General Liability using ISO form 20 38, or coverage at least as broad. In addition, Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor.

All coverages for subcontractors shall be subject to all of the requirements stated herein.

3.14.11 Reporting of Claims. Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

13.b
Packet Pg. 513
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

20 3.15 Bond Requirements.

3.15.1 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.2 Performance Bond . If specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.3 Bond Provisions . Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the C ontract for cause.

3.15.4 Surety Qualifications . Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.16 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non -conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work.

Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal,

13.b
Packet Pg. 514
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

21 replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, wheth er express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor ’s sole expense.

Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.17 Employee/Labor Certifications.

3.17.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contrac t as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.17.2 Equal Opportunity Employment . Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.17.3 Verification of Employment Eligibility . By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Ac t of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same. The City shall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for in Section 3.17 or any of its sub-sections.

3.18 General Provisions.

3.18.1 City’s Representative. The City hereby designates the Chad Blais, Director of Public Works or his or her designee, to act as its representative for the performance of this Contract ( “City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.18.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City (“′Contractor’s Representative”). Following approval by the City, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor ’s Representative shall

13.b
Packet Pg. 515
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

22 supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Co ntractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontract or of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s Representative, Contractor shall provide the information specified above and obtain the City’s written approval.

3.18.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate th is Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offse t City’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, ma terials or other matter prepared or built by Contractor in connection with its performance of this Contract.

Contractor shall be required to provide such document and other information within fifteen (15) days of the request. The City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Contractor shall not be entitled to payment for unperformed Work, including, without limitation, any overhead and profit on the portion of t he Work that is terminated and shall not be entitled to damages or compensation of any kind or nature for termination of Work.

3.18.4 Contract Interpretation . Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City’s Representative, whose decision shall be binding upon Contractor.

3.18.5 Anti-Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties.

3.18.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

13.b
Packet Pg. 516
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

23 CONTRACTOR:

LC PAVING & SEALING, INC.
620 ALPINE WAY
ESCONDIDO, CA 92029
ATTN: JOSE SALINAS, PRESIDENT
CITY:

CITY OF COLTON
650 NORTH LA CADENA DRIVE
COLTON, CA 92324
ATTN: CHAD BLAIS, DIRECTOR OF PUBLIC WORKS
Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.18.7 Time of Essence . Time is of the essence in the performance of this Contract.

3.18.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.18.9 No Third Party Beneficiaries . There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.18.10 Laws, Venue. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of San Bernardino, State of California.

3.18.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.18.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.18.13 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability.

13.b
Packet Pg. 517
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

24 3.18.14 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Work.

3.18.15 Certification of License.

3.18.15.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.18.15.2 Contractors are required by law to be licensed and regulated by the Contractors ’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.18.16 Authority to Enter Contract . Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.18.17 Entire Contract; Modification . This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.18.18 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.18.19 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects.

3.18.20 Federal Provisions. When funding for the Work is provided, in whole or in part, by an agency of the federal government, Contractor shall also fully and adequately comply with the p rovisions included in Exhibit “G” (Federal Requirements) attached hereto and incorporated herein by reference (“Federal Requirements”). With respect to any conflict between such Federal Requirements and the terms of this Contract and/or the provisions of state law, the more stringent requirement shall control.
[Signatures on Next Page]

13.b
Packet Pg. 518
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

25 SIGNATURE PAGE FOR CONSTRUCTION CONTRACT

BETWEEN THE CITY OF COLTON
AND LC PAVING & SEALING, INC.

IN WITNESS WHEREOF, the Parties have entered into this Contract as of the 17th day of June, 2025.

CITY OF COLTON LC PAVING & SEALING, INC.

CORPORATION

By: ____________________________ By: _________________________ William R. Smith Jose Salinas
City Manager President

Attest:

____
Isaac T. Suchil
City Clerk

_______________________________
Contractor’s License Number/Classification

_______________________________
DIR Registration Number

Approved as to Form:

______________________________
Best Best & Krieger LLP
City Attorney

13.b
Packet Pg. 519
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit A-1

EXHIBIT “A”

SERVICES / SCHEDULE
Scope of work - Installation of traffic signal pole and equipment, PCC curb ramps, sidewalk and curb & gutter realignment, AC pavement, tr affic signage, pavement striping and markings per plan no. 1374-1.

13.b
Packet Pg. 520
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit B-1

EXHIBIT “B”

PLANS AND SPECIFICATIONS / PROPOSAL

13.b
Packet Pg. 521
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 522
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 523
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 524
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 525
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 526
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 527
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 528
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 529
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 530
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 531
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 532
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 533
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 534
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 535
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 536
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 537
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 538
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 539
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 540
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 541
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 542
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 543
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 544
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 545
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 546
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.b
Packet Pg. 547
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit C-1

EXHIBIT “C”

SPECIAL CONDITIONS
ARTICLE 1. BONDS
Concurrently with this Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

13.b
Packet Pg. 548
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit D-1

EXHIBIT “D”

CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

LC Paving & Sealing, Inc.

By: _________________________
Signature
_________________________
Name (Print)
_________________________
Title (Print)

13.b
Packet Pg. 549
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit E-1

EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor ’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.1
Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:__________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:

1. Contractor shall maintain a current DIR registration for the duration of the project.

2. Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor:____________________
Signature:

Name and Title:

Dated:

1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

13.b
Packet Pg. 550
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-1

EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

13.b
Packet Pg. 551
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-2

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Colton (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements i n the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during w hich time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfull y fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety ’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:

13.b
Packet Pg. 552
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-3

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contra ct price ” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price ” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount pr eviously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

Remainder of This Page is Intentionally Left Blank

13.b
Packet Pg. 553
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-4

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title

(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Principal and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)

(Name and Address of Agent or
Representative for service of
process in California, if different
from above)

(Telephone number of Surety
and Agent or Representative for
service of process in California)

13.b
Packet Pg. 554
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-5

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

13.b
Packet Pg. 555
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-6

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Colton (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20 ____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW, THEREFORE, we, the Principal and __________________________, a corporation organized and existing under the laws of the State of _______________ and authorized to transact surety business under the laws of the State of California as Surety, are held and firmly bound unto City in the sum of ______________ Dollars ($___________) lawful money of the United States of America, the sum not being less than One Hundred Percent (100%) of the total amount of the Contract, for the payment of which sum well and tr uly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials , provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or

13.b
Packet Pg. 556
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-7

released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such cha nge, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

The Remainder of this Page is Intentionally Left Blank

13.b
Packet Pg. 557
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-8

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title

(Corporate Seal) Surety
By

Attorney-in-Fact
Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THE FOLLOWING INFORMATION IS MANDATORY
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

13.b
Packet Pg. 558
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit F-9

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the p erson(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer

Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

13.b
Packet Pg. 559
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.) 23152.04000\42402756.1

Exhibit G-1

EXHIBIT “G”

FEDERAL REQUIREMENTS

NOT APPLICABLE

13.b
Packet Pg. 560
Attachment: Exhibit B - Contract (4974 : Contract Award - LC Paving & Sealing, Inc.)

1 2

3 4

5 6

7 8

9 10

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

RESOLUTION NO. R-53-25

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLTON
AMENDING THE FISCAL YEAR 24/25 CAPITAL IMPROVEMENT BUDGET

WHEREAS, the City of Colton (“City”) is a municipal corporation duly organized and existing pursuant to the Constitution and laws of the State of California; and,

WHEREAS, the City intends to support the City’s goal to improve the City’s traffic safety and infrastructure; and,

WHEREAS, the City of Colton received Active Transportation Program (ATP) funding from the state in the amount of $2,108,000 for the construction phase of the West Colton Bike Lane Project; and,

WHEREAS, the City of Colton needs to allocate additional funding in the amount of $110,054.40 as local match to complete the construction phase for the West Colton Class I Bike Trail Project; and,

WHEREAS, a budget appropriation not listed in the Fiscal Year 24/25 budget is required and must be approved by resolution of the City Council.

NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF COLTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1 The above recitals are true and correct.

Section 2 The City Council authorizes the following amendment to the FY24/25 budget:

• Increase revenues by $2,108,000 in account number 225-5886-002; and • Appropriate $2,108,000 in Miscellaneous Grants Fund capital improvement account number 225-2026-6150-3890-0000-000 for the West Colton Bike Lane Project. • Appropriate $110,054.40 from reserve balance in the Local Traffic Impact Fund to capital improvement account number 249-2347-6150-3890-0000-000 for the West Colton Class I Bike Trail Project.

PASSED, APPROVED AND ADOPTED THIS 17th DAY OF JUNE 2025.

__________________________
FRANK J. NAVARRO
Mayor

ATTEST:

__________________________________
ISAAC T. SUCHIL
City Clerk

13.c
Packet Pg. 561
Attachment: Exhibit C- Resolution 53-25 (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.d
Packet Pg. 562
Attachment: Exhibit D - Funding Finance Letter (4974 : Contract Award - LC Paving & Sealing, Inc.)

13.d
Packet Pg. 563
Attachment: Exhibit D - Funding Finance Letter (4974 : Contract Award - LC Paving & Sealing, Inc.)

ITEM NO. 14

STAFF REPORT

DATE: JUNE 17, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: BILL SMITH, CITY MANAGER
PREPARED BY: CHAD BLAIS, PUBLIC WORKS AND UTILITY SERVICES

DIRECTOR
SUBJECT: APPROVE AWARD OF CONTRACT TO SYNAGRO FOR HAULING & DISPOSAL OF CLASS B BIO-SOLIDS.

RECOMMENDED ACTION

Staff recommends that the City Council take the following action:

1. Approve a Maintenance Service Agreement with Synagro to provide Hauling and Disposal Services for Class B Bio -Solids waste from the City of Colton Wastewater Treatment Plant for a term of three years at an annual cost of $ 685,000, plus a one -time initial cleanup cost of $ 450,000 and a total not to exceed cost of $ 2,505,000 for a three- year period.

2. Authorize the City Manager to approve and execute up to two, one-year contract extensions at an annual cost of $ 685,000 plus an index CPI at the beginning of each year for years four and five.

BACKGROUND

Biosolids are a byproduct of the wastewater treatment process and must be managed and disposed of in an environmentally responsible manner, in accordance with the U.S.

Environmental Protection Agency (EPA) regulations outlined in 40 CFR Part 503. In addition, the State of California and the County of San Bernardino impose specific environmental standards governing the disposal of biosolids.

The City’s Wastewater Treatment Plant generates approximately 9,000 tons of biosolids annually. The City's contracted hauler is required to comply with all applicable State and County regulations regarding the handling, transport, and disposal of biosolids. 14 Packet Pg. 564
Staff Report to the Mayor and City Council
Contract Award - Synagro
June 17, 2025

Page 2 ends
← All documents from this meeting