SUBMITTAL DEADLINE
To be considered, proposals must be submitted no later than Tuesday, March 7, 2024 at 5:00 p.m. to the City Clerk’s Office, 205 South Willowbrook Avenue, Compton, California, 90220.

Postmarks will not be accepted. The City may extend the deadline at its option.

During this period of restricted contact, any attempt by a proposing firm, its representative or agent to contact, lobby, or make a representation to a member of the City Council, or any other official, employee, or agent of the City will be grounds for disqualification.

Vernell McDaniel
City Clerk
Publish: 02/21/2024

Page 3 of 11 ends

REQUEST FOR PROPOSAL

CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT

INTRODUCTION TO THE CITY OF COMPTON
The City of Compton was incorporated in 1888. The City totals approximately 10.2 square miles in size, and is home to more than 93,597 residents (2022). The City has approximately five (5) major parks with recreational facilities, eight (8) neighborhood parks, one (1) Par 3 Golf Course and two (2) commercial swimming pools.

The City has two swimming pools Lueders Park swimming pool built in 1972 and Gonzalez Aquatic Center built in 2002. Both pools need to be updated and we are seeking qualified consultants to provide the following services:

SCOPE OF WORK
The City of Compton is requesting proposals from experienced and qualified vendors, hereinafter referred to as the “Contractor”, to provide aquatic facility construction consulting services including but not limited to:

Task 1 – Project Management, Meetings and Coordination
Task 2 – Research and Data Collection
Task 3 – Prepare Design Built RFP
Task 4 – Bidding Support and Selection
Task 5 – Review Design Built Plans, Specifications and the Estimates Task 6 – Construction Support
Task 7 – Project Close-out

PROPOSAL FORMAT
Your proposal should be submitted in the following format:

Section 1: Describe your firm, including your area of specialization; number of employees; prior experience performing similar services; current workload; current financial environments, etc.

Section 2: Describe your firm’s or employees’ experience working for or with municipal governments.

Page 4 of 11 ends

Section 3: Describe how you typically communicate with City staff regarding your status.

Please provide any report format you currently use to keep City staff informed about the status.

Section 4: Provide the names and backgrounds of the individuals who will be providing the actual services to the City. Include their prior experience providing aquatic facility construction consulting services to municipalities and/or their previous experience working with municipalities.

Section 5: Provide the total annual cost to perform the aquatic facility construction consulting services for the activity levels described in the Proposal Form herein. This shall be the total amount payable to the Service Provider by the City. The total amount shall be divided by twelve (12) and invoiced and paid monthly.

Section 6: Provide any additional information you believe will be helpful to assist in the review of your proposal. Include any attachments, exhibits, or reports which you feel will help us to gain a better understanding of your firm’s ability to provide this service to the City of Compton.

Your proposal must respond to and conform to the Consulting Services” specifications listed in this document.

PROPOSED SCHEDULE OF EVENTS
The following is the proposed schedule for the selection process:

Release of RFP by the City to Service Providers 02/21/2024 RFP’s final submittal date 03/07/2024
Council approval of Agreement (Tentative) 03/26/2024 (tentative) Agreement commencement (Tentative) 04/25/2024 (tentative)

DEFINITION OF TERMS
Whenever the terms listed below appear in the Contract Documents, they shall be defined as follows:

1. City shall mean the City of Compton, California, as it now exists or as its boundaries may from time to time be change.

2. Contractor, Service Provider, Bidder, Firm, Corporation shall mean the person with whom the City has executed the Agreement and who is fully responsible for performance of the work.

Page 5 of 11 ends

MISCELLANEOUS PROVISIONS
These specifications and the draft agreement are complementary. This RFP does not commit the City to enter into an agreement or to pay any costs incurred by proposers in the preparation of a proposal.

The City reserves the right to accept or reject any or all proposals received as a result of this RFP.

The City reserves the right to cancel in part, or in its entirety, this RFP.

Any changes to the RFP requirements will be made by addendum. All addendum shall be signed by bidders and attached to the proposal. Failure to attach any addendum may render the proposal non-responsive and cause it to be eliminated from consideration.

The City may require the selected bidder(s) to participate in negotiations and to submit such prices, technical or other revisions to their proposals as may result from negotiations. Bidder(s) selected for an interview may be asked to submit “best and final” cost proposals as a final step in the selection process.

All responses to the RFP become the property of the City of Compton. At such time a final award is made, all proposals submitted in response to this RFP become a matter of public record and shall be regarded as public records, with the exception of those elements in each proposal which are defined by the bidder as business or trade secrets, and marked “Trade Secret,” “Confidential,” or “Proprietary.”

SELECTION
All proposals will be reviewed by the Department of Recreation Department Director and other relevant staff. The Department of Recreation Department Director and staff will evaluate the proposals based upon price, service plan, experience, and customer service experience.

During the evaluation process, the Department of Recreation Department, at his discretion, may request any or all service providers to provide oral presentations. Such presentations will provide service providers with an opportunity to answer any questions the selection committee may have on a service provider’s proposal. Not all firms may be asked to make oral presentations.

There is no expressed or implied obligation for the City to reimburse responding service providers for any expenses incurred in making an oral presentation to the selection committee.

Upon completion of the evaluation process, the Department of Recreation Department Director will recommend a service provider for selection to the City Council.

Page 6 of 11 ends

1.0 GUIDELINES

1.1 Purpose of Procurement
The purpose of the Request for Proposal (RFP) is to outline the City of Compton’s interest in obtaining the services of a qualified company to provide aquatic facility construction consultant services. Consultant services must meet all consultant services requested. Proposing companies are hereby invited to submit their proposals in accordance with the terms of this document.

1.2 Basic Guidelines for this Request for Proposal
The qualifications shall be evaluated in accordance with the criteria set forth in this Request for Proposal (RFP). Proposing firms shall be afforded fair and equal treatment with respect to any opportunity for discussion and revisions; and such revisions may be permitted after submissions prior to the deadline date for the purpose of obtaining the best and final offers.

Selection shall be made to the proposing firm whose qualifications are determined in writing to be the most advantageous for the City, considering all of the evaluation factors set forth in this RFP. No other factors or criteria shall be used in the evaluation. The City reserves the right to reject any and all proposals submitted in response to this request.

1.3 Contract Term
No award shall be binding upon the City unless and until consummated by a written, fully executed contract. The contract duration is expected to begin March 2024 and conclude at the end of the construction project. The City will retain the right to terminate the contract at any time.

1.4 Withdrawal of Proposal
Proposals submitted early may be withdrawn by the proposing firm prior to the proposal due date specified. Following the proposal date, the proposal constitutes a binding offer and may not be withdrawn prior to the award.

1.5 Costs of Preparation
The proposing firm shall be solely responsible for any and all costs associated with developing and preparing the proposal.

1.6 Reservation of Right
The City of Compton reserves the right to: (a) waive minor irregularities or variances, non-material bid formalities or defects in any proposal;

Page 7 of 11 ends

(b) reject any and all proposals, in whole or in part, submitted in response to this RFP; (c) request clarifications from all proposing firms; (d) request resubmissions from all proposing firms; (e) make partial, progressive or multiple awards; and (f) withdraw or cancel this RFP without prior notice, at any time, at its sole discretion.

2.0 DESCRIPTION OF REQUIREMENTS

2.1 Objective of the Procurement
The overall and ultimate objective of this Request for Proposal is to provide aquatic facility construction consulting services within the City of Compton at Gonzales Aquatic Center and Lueders Park swimming pool from the selected or contracted firm (“Contractor”).

2.2 Duties and Procedures
The Contractor shall adhere to the following duties and procedures in the fulfillment of the scope of services.

2.3 Personnel and Equipment. The work consists of furnishing all labor, materials, machinery, tools, means of transportation, supplies, equipment and services necessary for the aquatic facility construction consulting services in the City.

1. Work Orders and Communication. Work orders for aquatic facility construction consulting services will be provided by e-mail to the Contractor from the City’s representative. The Contractor shall respond by e-mail promptly with an acknowledgment of receipt; if sent before 12:00 pm, the Contractor shall respond by 5:00 pm the same day or if sent after 12:00 pm, the Contractor shall respond by 9:00 am the next day.

Each time work is completed, the Contractor is responsible for cleaning and removing from each area worked in, all debris, materials and equipment associated with the work performed.

2. Notice To Proceed and Schedule. Once the aquatic facility consultant’s construction and renovation plans are approved by the City representative, a Notice to Proceed (NTP) will be issued to the Contractor. The Contractor is not to commence work until an NTP is issued.

3. Responsiveness. The City expects the Contractor to respond promptly through the weekends and holidays. Work shall be performed during or after business hours, on weekends and during holidays if necessary.

4. Property Damage. Services performed under this contract, the Contractor shall notify the City representative within 24 hours if damage occurs and replacement and/or repair shall be done at no cost.

Page 8 of 11 ends

2.4 Additional Requirements

1. Contractor will have ten (10) days to correct any unsatisfactory performance as determined by the City representative for no extra compensation. If the correction is not made within ten (10) days, no payment shall be rendered for the work. If two of these instances occur within a 12-month period without correction in 10 days, the contract may terminate for cause upon 7 days’ notice by the City. Additionally, the contract will be terminated by the City upon 30 days’ notice.

2. The Contractor shall maintain all permits, certificates, and licenses necessary to perform the aquatic facility construction consulting services described herein.

3. The Contractor may not assign this contract or subcontract to another party for performance of the terms and conditions hereof without the written consent of the City. All correspondence authorizing subcontracting must reference the contract and identify the specific job being subcontracted.

3.0 PROPOSAL PACKAGE
A complete proposal package must be submitted to be considered and shall include four (4) copies of your service proposal, one must be digital. The proposal shall consist of the elements within the following sections. E-mail submittals are not accepted.

3.1 Basic Information

1. Provide basic company information: owner, company name, address, name of primary contact, telephone number, fax number, e-mail address, and company website (if available). If the firm has multiple offices, the qualification statement shall include information about the parent company and branch office separately. Provide form of ownership, including state of residency or incorporation, and number of years in business. Indicate if the proposing firm is a sole proprietorship, partnership, corporation, Limited Liability Corporation (LLC), or other structure.

2. Identify and provide the name of the project manager who will be assigned to this contract. The project manager is the foreman or responsible person overseeing and/or participating in the actual work. Provide all relevant experience along with references for the project manager, completed projects and contact information for references.

3. Provide the overall qualifications and experience for the firm itself with references. These references may overlap with those for the project manager.

4. Overall at least three (3) references must be provided, illustrating similar and relevant experience with services provided to organizations, communities or agencies, highlighting successfully completed related projects. Please include references of people, firms, or agencies that may be contacted to verify this experience. Please provide name, e-mail address, and phone number.

Page 9 of 11 ends

References should be able to validate firm experience and project manager experience. Demonstrating successful experience with public agencies is highly desired.

3.2 Cost and Pricing

1. (a) Provide a complete list of rates for services from which the cost of each service request shall be priced.

2. The cost proposals must be inclusive of all related costs including but not limited to: materials, labor, and administrative costs and any taxes that may be levied. It is the responsibility of the bidder to determine any and all taxes and/or fees and include same in the proposal.

3. Pricing shall include all cost, both direct and indirect to perform the work.

3.3 Insurance Requirements
Demonstrate ability to fulfill insurance requirements as follows:

1. Commercial General Liability Insurance. $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

2. Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

3. Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Contractor has no employees and provides, to City's satisfaction, a declaration stating this.

4. Professional Liability. Errors and omissions liability appropriate to Contractor’s profession with limits of not less than $1,000,000 per claim.

The coverage shall also provide an extended two (2) year reporting period commencing upon termination or cancellation of this Agreement.

Endorsements.

For Commercial General Liability Insurance and Automobile Liability Insurance, Contractor will ensure that the policies are endorsed to name the City of Compton and its respective elected and appointed officers, officials, employees, agents and volunteers as “additional insured” with respect to liability arising out of the activities of the Contractor. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City. Prior to City's execution of this Agreement, Contractor will furnish certificates of insurance and endorsements to City.

Waiver of Subrogation.

The policies shall contain a waiver of subrogation for the benefit of City.

Page 10 of 11 ends

4.0 EVALUATION

4.1 Proposals
Each response shall be prepared simply and economically, providing straightforward, concise delineation of proposing firm’s capabilities to satisfy the requirements of this RFP. Emphasis on each proposal must be on completeness and clarity of content. To expedite the evaluation of qualifications, it is essential that proposing firms follow the format and instruction contain herein.

4.2 Proposal Submission
Proposals are due at the location specified below no later than:

Tuesday, March 7, 2024 at 5:00 P.M.

Submit four (4) copies of your service proposal, one must be digital, to:

City of Compton
City Clerk’s Office
205 South Willowbrook Avenue
Compton, CA 90220
Attention: Bryan Spragg
Director of Recreation

4.3 Evaluation Criteria and Process
The following items are evaluation criteria for all qualifying proposals and will be rated on a point system basis by the evaluation team. Submittals must provide all information as required in this RFP.

1. Firm’s qualifications and experience (5 points max)

2. Firm’s references for experience (10 points max)

3. Proposed project manager’s qualifications and experience (10 points max)

4. Proposed project manager’s references for experience (15 points max)

5. Overall examples of similar and relevant work (15 points max)

6. Demonstrated successful experience with public agencies (10 points max)

7. Approach and responsiveness to sign removal and installation services (15 points)

8. Completeness and responsiveness to RFP requirements (10 points)

9. Familiarity with the City of Compton (5 points)

10. Local Hiring Credit (5 points)

4.4 Review of Qualifications
All qualifications received will be reviewed by the City to ensure that all administrative requirements of the RFP package have been met by the proposing firm. Failure to meet these requirements may be cause for rejection of a qualification. All technical qualifications that meet the administrative requirements will then be turned over to the technical evaluation team members for further evaluation.

Page 11 of 11 ends

4.5 Selection and Evaluation Process
The City will complete the selection process and in its sole discretion, and in the course of its evaluation, may request interviews or presentations with one or more selected proposing firms. The selection process shall be completed at the pleasure of the City, but is anticipated to conclude within thirty (30) days after submittal. An invitation will be extended to the finalist to complete a contract for services.

4.6 Preliminary Award of Contract Schedule
The following dates reflect the anticipated schedule for proposal solicitation, selection of Consultant and award of contract.
• Solicit Proposals for Services 02/14/2024
• Proposals Due 03/07/2024
• Review Proposals 03/10/2024 (week of)
• Recommend Award to City Council 03/26/2024 (tentative) • Agreement commencement (tentative) 04/25/2024 (tentative)

5.0 ADDENDUM
All inquiries and questions of this RFP must be submitted in writing by e-mail to [email protected]. Written responses to all written questions will be addressed in the form of an addendum and available on the City’s website at www.comptoncity.org Questions and inquiries will not be answered by any other means. If the website is down, responses will be provided by e-mail or fax upon request.

During this period of restricted contact, any attempt by a proposing firm, its representative or agent to contact, lobby, or make a representation to a member of the City Council, or any other official, employee, or agent of the City will be grounds for disqualification
Aquatic Facility Consultant Services
Submitted By:

Covering the City of Compton Parks

03.07.24 Response to Request for Proposals to Provide
18645 East Gale Avenue | Suite 212 | City of Industry, CA 91748 626.820.1137 | www.jmdiaz.com
18645 East Gale Avenue, Suite 212, City of Industry, CA 91748 (626) 820-1137 Tel ● (626) 820-1136 Fax
www.jmdiaz.com
March 7, 2024
Mr. Bryan Spragg
Director of Recreation
City Clerk’s Office
City of Compton
205 South Willowbrook Avenue
Compton, CA 90220 2024.1112.0017.00
SUBJECT: Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Dear Mr. Spragg:

JMD, a full-service engineering firm, with extensive City of Compton (City) experience, is pleased to submit this proposal to provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools. Our proposal, which remains in effect for a period of 90 days, has been prepared in accordance with the City’s Request for Proposal, issued February 21, 2024 and outlines our qualifications, approach and scope of services for the subject project.

We have assigned one of our most qualified Project Managers, Deepak Solanki, who has over 32 years of experience assisting local agency Land Development Divisions with plan reviews for new developments and has managed numerous Capital Improvement Projects for public works departments. He has extensive experience in the design and plan review of diverse civil engineering projects, such as parks, street, sewer, grading, flood control projects, backbone utility layout and utility relocation. As Project Engineer and Project Manager, he has prepared design plans for single family residential subdivisions, commercial, industrial, educational facilities and Air Force/Naval Base facilities including underground utilities.

Our proposal has been organized to meet the requirements required by the City and includes the following sections:

Section 1 Firm Introduction
Section 2 Project Experience
Section 3 Project Approach and Scope of Work
Section 4 Key Personnel
Section 5 Cost Proposal
We are excited about the possibility of serving the City of Compton on this project and firmly believe we have numerous benefits to offer including:
 A Project Manager and Firm with local knowledge and City of Compton experience.  An Experienced Project Manager with miles of roadway analysis and design experience.  A responsive, innovative and cost-effective project approach and a reputation for quality.

Should you have any questions regarding this proposal, please contact me at (626) 820-1137 ext. 1101.

Sincerely,
JMDiaz, Inc.

Juan M. Diaz, MBA, PE
President/CEO
Page | TOC
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Table of Contents
I. Firm Introduction ..................................................................................................................................... 1 II. Experience and Technical Competence.................................................................................................. 3 III. Project Understanding, Approach and Scope of Services....................................................................... 6 IV. Proposed Staffing................................................................................................................................... 9 V. Cost Proposal ....................................................................................................................................... 18 VI. Additional Information........................................................................................................................... 20 Page | 1
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
I. Firm Description
JMDiaz, Inc. (JMD), a California corporation, offers a
full range of architecture, transportation planning and civil engineering for local agencies, schools, railroads and private entities in California.

Founded by owner Juan M. Diaz in 2001, JMD has
been serving clients from its office in City of Industry, California for over 23 years. Currently, JMD has a staff of 26 professionals and administrative staff.

Through the proven experience of its professionals and
technical staff, JMD has earned a reputation of quality, commitment and responsiveness by providing
innovative and timely design solutions on projects
sponsored by private developers and public agencies.

JMD’s reputation is complemented by its values and
commitment to improve quality of life as expressed in
its mission statement:
“To provide responsive, innovative and effective
solutions that improve quality of life.”
In addition to its comprehensive qualifications, JMD is also certified with local agencies as a:
• Community Business Enterprise (CBE)
• Disadvantaged Business Enterprise (DBE)
• Local Small Business Enterprise (LSBE)
• Minority Business Enterprise (MBE)
Services
JMD offers a wide range of services covering planning,
engineering and management for public and private
sector clients. These services, outlined to the right,
cover all phases of project development from
conceptual design through construction. Such depth of
services is one of JMD’s unique and distinguishing
characteristics that have contributed to its success.

Location
JMD has four (4) office locations:

City of Industry, CA
18645 East Gale Avenue, Suite 212
City of Industry, CA 91748
Phone (626) 820-1137 ● Fax (626) 820-1136
www.jmdiaz.com
• Orange County, CA
• San Diego, CA
• West Covina, CA
Planning
• Civil
Master Plans
Concept Design
Feasibility Studies
• Highways
Project Study Reports
Project Reports
• Land Development
Master Plans
Traffic Impact Studies
• Traffic
Traffic Impact Studies
Warrant Analysis
• Rail
Rail Corridor/Feasibility Studies
Rail Safety Studies/Grade Crossing Analysis
Quiet Zones
• Structures
Grade Separation Feasibility Studies
Engineering
• Highway/Roadway Design
Mainlines/Ramps/Interchanges
Roadway Rehabilitation/Streetscapes
Bikeways/Trails
• Land Development
Residential/Commercial Sites
Campus Expansions/Master Plans
• Rail Design (HSR, Light, Commuter & Freight)
Mainline/Industry/Shoofly Alignment
Grade Crossings/Stations/Quiet Zones
• Structures
Rail/Highway Grade Separations
Pedestrian Bridges
• Traffic/Transit Design
Signing and Striping
Traffic Signals/Lighting/Traffic Control
Rail/Bus Rapid Transit Corridors
Stations/Parking Facilities
Management
• Project/Program Management
• On Site Municipal Services
• Staff Augmentation
• Construction Management
• Construction Inspection
Page | 2
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Service Areas
Planning
JMD develops planning studies for a host of
transportation and land development projects.

Planning studies for transportation projects include the development of project study reports and project
reports related to highway projects involving railroads and State agencies such as Caltrans. JMD
professionals are very familiar with Caltrans project
development procedures, standards and requirements
for State highways. In addition, JMD assists local
agencies with funding applications in accordance with
California Public Utilities Commission (CPUC) and
Caltrans/FHWA requirements.

JMD also prepares feasibility studies for a variety of
projects including roadway and rail corridor projects
including rail/highway grade separations as well as
grade crossing safety and quiet zone projects requiring careful coordination with multiple stakeholders and
sensitive agencies, railroads and communities. JMD
staff is also experienced in the development of traffic studies for site development and transportation
projects. JMD staff have prepared traffic impact studies for land development projects including commercial,
residential, school and large resort projects. These
studies include traffic impact, access, circulation and parking studies.

Engineering
JMD offers expertise in several areas of civil
engineering including highway, land development, rail,
traffic and transit engineering. JMD’s experience
includes the development of plans, specifications and
estimates for a variety of facilities including freeways, roadways, streetscapes, traffic signals, lighting
systems, light rail corridors, railroads, grade crossings and development sites. These projects have required
JMD’s expertise in roadway, grading, drainage, utility, signing & striping, traffic signals, lighting, traffic control, grade crossing, transit and track alignment design.

Management
JMD provides three types of management services,
namely, project management, construction
management and program management. JMD
provides project and program management services to
public agencies in the development of transportation
projects. These services include assisting local
agencies in applying for State and local funding for the development of public works projects including
roadway, trackwork and rail/highway grade separation
projects.

Corporate Stability
JMD is a growing engineering firm properly managed
to maintain stability, innovation, cost effectiveness and responsiveness. Stability is assured through managed
growth whereby resources are made available to meet
client needs. Cost effectiveness is made possible by
effectively monitoring resources and expenses and
passing on achieved savings to clients by way of
offering the lowest overhead costs in the industry. Most importantly, is responsiveness which is made possible
through effective project management and
commitment to meeting project objectives within
schedule and budget. The net result is a successful
organization, growing through repeat business,
leading projects as a prime consultant and successfully competing with the largest firms in the nation.

JMD is financially strong, with minimal debt, and
without bankruptcy, pending litigation, planned office
closures and impending mergers. Most importantly,
JMD’s strength in completing this project is reinforced by its clients who seek responsiveness regardless of
size. In fact, JMD is currently completing projects for clients who have not been fully satisfied by the work of larger firms.

Financial Condition
Incorporated in 2005, JMDiaz, Inc. (JMD) is 100%
Hispanic-owned by Juan M. Diaz, the firm’s Chief
Executive Officer. JMD is in good standing with
the California Secretary of State and is not a subsidiary of any other firm or entity. In addition, JMD is financially strong, with minimal debt and without bankruptcy,
pending litigation, outstanding claims, planned office
closures and impending mergers. In addition, JMD’s
Dun and Bradstreet Class 1 credit rating of 2R3 is
considered a strong credit rating.

JMD’s strength in completing the subject RFP scope of
services is reinforced by its increasing project contract values currently yielding nearly $4,000,000 in fees
annually. Most importantly, however, is JMD’s earned
trust among its clients who seek responsiveness and
competence regardless of size of firm. In fact, JMD has been retained by several agencies to complete
projects partially or unsatisfactorily completed by other firms.

Page | 3
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
II. Experience and Technical Competence
Project Experience and References
JMD has a history of successful projects with similar
scope and work for many agencies throughout Southern
California. Founded in 2001, JMD has been serving
clients for over 23 years. Currently, JMD has a staff of 28 professionals and administrative staff.

In accordance with the City’s RFP, JMD has provided
prior experience working with various municipalities.

On Call Engineering - Guadalupe Park Trail and
Rehabilitation, City of La Habra
JMD conducted final design for the Guadalupe Park Trail Design for Park Rehabilitation Project in the City. The purpose of this improvement project is to encourage the use of active modes of transportation. This park links to the City’s UPRR Bikeway Project in UPRR property.

This trail is part of the Orange County Loop, a 66-mile multipurpose trail serving 17 cities in the County.

Client: City of La Habra
Contact: Mr. Michael Plotnik, TE, Traffic Manager
110 East La Habra Boulevard
(562) 383-4162 Tel.
[email protected]
Duration: 2019-2023
On Call Engineering – La Bonita Park
City of La Habra
JMD provided design engineering for the La Bonita
Skatepark Security Cameras and Lighting
Improvements Project in the City of La Habra. Security
improvements included installation of new HighDefinition CCTV cameras and lighting fixtures around the skatepark and basketball facilities. Camera design
included communication routing, network server
upgrades, new switches along with troubleshooting of
existing cameras and network. Lighting design included
illumination calculations, conductor and conduit routing, electrical panel upgrade, new flood lights as well as new luminaires and poles.

Client: City of La Habra
Contact: Mr. James Valdez, Assistant Civil Engineer
110 East La Habra Boulevard
(562) 383-4161 Tel.
[email protected]
Duration: 10/2021 - 8/2022
On-Call Engineering Services
City of Covina
JMD provided on-site and off-site, on-call engineering
services to the City of Covina. Services included
resolving questions and concerns regarding public
improvements, field investigations report checking and
plan reviews, front counter coverage, engineering
overview and technical support for public works
department activities. JMD also reviewed traffic signal, traffic control and street lighting plans as well as
performed special investigations or studies related to
safe route to schools including lighting assessments.

Page | 4
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Hollenbeck Park Lighting
JMD provided professional engineering services for the
design of parking lot lighting in Hollenbeck Park. The
design included LED lights and provided illumination
levels meeting current standards.

Contact: City of Covina, Public Works Department
Alex Gonzalez (former Assistant Public
Works Director)
125 East College Street
Covina, CA 91723
(626) 319-8442 Tel.

Duration: 2014 - 2019
Personnel: J.Diaz, S.Itagaki, W.Bautista, P.Kim,
J.Bareng, G.Andrade
Desiderio Park Development – City of Pasadena
JMD prepared PS&E documents for the Desiderio Park
development in the city of Pasadena. The site served as a US Army training facility and was donated to the city for development of a neighborhood park. PS&E
development tasks consisted Civil grading plans, utility water/sewer/electrical plans, erosion control and
SWPPP documents.

Santa Fe Springs Parks, Parking Lot Expansion
Projects – City of Santa Fe Springs
JMD prepared PS&E documents for both the Santa Fe
Springs Park and Los Nietos Park Parking Lot
Expansion Projects in the City of Santa Fe Springs. The existing parking lots were expanded to accommodate
additional vehicles, ADA parking, and walkway
connectivity to remote picnic area. Tasks consisted of
site improvements, drainage and grading, signing and
striping, pavement rehabilitation, parking lot lighting, landscape and irrigation design.

Client: City of Santa Fe Springs
Contact: Mr. Alex Flores
11710 Telegraph Road
Santa Fe Springs, CA 90670
(562) 868-0511 Ext. 7507Tel.
[email protected]
Duration: 2022-2023
Personnel: I.Salvatierra, D.Dardoon, D.Hosseini
Westcliff Street Light Improvement and West
Bonita Creek and San Miguel Park Lighting
Replacement Project
JMD provided professional engineering design services
for the proposed street lighting improvement in the
Westcliff area and the lighting replacement project at
Bonita Creek Park and San Miguel Park. The project
included replacement or refurbishment of existing street light facilities within the Westcliff area. This project involved approximately 160 incandescent lamps and
approximately 30,000 linear feet of conduit and wiring.

In addition to the street lights within the Westcliff area, the existing steel street lights at Bonita Creek Park and San Miguel Park were replaced.

Page | 5
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Contact: City of Newport Beach
Public Works Department
Michael J. Sinacori, P.E., Project Manager
3300 Newport Boulevard
Newport Beach, CA 92658
(949) 644-3342 Tel
[email protected]
Duration: 2008
Personnel: J.Diaz, S.Itagaki, W.Bautista, N.Baclit,
G.Andrade
On Call Engineering – Montwood Park Lighting,
City of La Habra
JMD is currently designing lighting improvements for
Montwood Park in La Habra. The lighting project,
consisting of analysis and design, is meant to enhance
current lighting by adding new lighting fixtures.

Client: City of La Habra
Contact: Mr. Michael Plotnik, TE, Traffic Manager
110 East La Habra Boulevard
(562) 383-4162 Tel.
[email protected]
Duration: 2021-Present
Personnel: J.Diaz, I.Salvatierra, D.Dardoon, D.Hosseini References
JMD encourages you to contact the following five (5)
references, as well as the references listed with the
project descriptions regarding the past record of
performance, quality of work and the ability to maintain project cost and schedules on projects that they have
undertaken with our firm.
• Michael Plotnik, PE, TE
Traffic Manager
City of La Habra
110 E. La Habra Blvd.

La Habra, CA 90631
(562) 383-4162; [email protected]
• Alison Sweet, RCE (Retired)
Former Director of Public Works/City Engineer
City of Glendora Public Works Dept.
444 North Amelia Ave., Apt. 1B
(626) 629-9597; [email protected]
• Glen W. C. Kau, PE
Director of Public Services/ City Engineer
City of Norwalk
12700 Norwalk Blvd, Room 12
Norwalk, CA 90650
(562) 929-5723; [email protected]
• Szeka “Angela” Cheng, PE
City Engineer
City of San Gabriel
917 East Grand Avenue
San Gabriel, CA 91776
(626) 308-2825; [email protected]
• Alex Gonzalez
Director of Development Services & Admin.

City of Industry
15625 Stafford St.

Industry, CA 91744
(626) 319-8442; [email protected]
Page | 6
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
III. Project Understanding, Approach and Scope of Services Project Understanding and Approach
JMD will provide professional engineering support for
aquatic facility construction consultant services
covering the City of Compton pools. JMD will prepare
a Design Build Proposal for upgrades at Gonzales
Park Pool and Lueders Park Pool. The proposal will
be broken down into Phase I and Phase II.

Improvements under Phase I shall be completed and
open for public use during summertime and initiate
improvements for Phase II during end of summer 2024.

JMD Staff will also provide support during bidding
process, responses to RFI’s, review of proposal’s and
assist in selection process.

Management Plan
JMD’s Management Plan, applicable to on-site and offsite tasks, consists of three primary components, namely, People Management, Project Management,
and Quality Management. The first focuses on leading
the team to achieve the desired project objectives. The latter two consist of using appropriate project controls to effectively manage the project deliverables,
schedule and budget. A typical project would be
managed in accordance with each component to meet
the City’s objectives in a timely manner. Each one of
these components is briefly discussed below.

People Management
People management consists of team leadership
through effective planning, staffing, and
communication as discussed below.

Planning
After our kickoff meeting with the City, we will hold an internal team meeting to discuss the project’s
objectives, milestones, staffing needs, schedule, and
task responsibilities. Our goal will be to establish a
realistic plan to meet all project requirements.

Staffing
JMD is committed to delivering quality and timely
services within the City’s time and budget goals. We
have provided sufficient resource capacity to perform
the project or tasks in a timely manner, and confirm that the key personnel proposed for the project will be
available for the duration of the project. Currently, our work level is estimated at approximately 60 percent of
capacity over the anticipated life of this project. Mr.

Solanki, our proposed Project Manager is available
over 60 percent of his time during the next 12 months.

Key Team Member Availability
(%)
Deepak Solanki 60%
Juan M. Diaz, MBA, PE 60%
Algis J. Marciuska, MBA, PE 60%
Jasmine Felix 70%
* Beginning March 1, 2024
During our internal team meeting, we will prepare a
team staffing plan to ensure the right people are
available at the right time for each project or task.

Periodic staffing meetings will take place as needed to adjust staffing levels accordingly to meet staffing
needs.

Communication
The Project Manager will work closely with each task
leader to develop the proposed submittals in
accordance with the project requirements. Through the
use of telephone calls, virtual meetings and e-mails,
the project team, including our subconsultant(s), will
discuss project issues, progress and reviews on a
periodic basis to meet each project milestone. The
ultimate objective is to lead the team to the desired
objectives through effective and timely communication.

Our Project Manager’s experience with the City and
staff augmentation programs confirms that the best
way to minimize delays and address unforeseen
problems is to proactively communicate with the City’s
Project Manager (PM) to alert him or her of potential
issues. In addition, often the City PM is so involved on other projects that he or she may not effectively
communicate changes in the City’s position or direction regarding a project. These situations can be avoided
Page | 7
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
with proper communication and documentation
through meetings, email and telephone conversation
minutes.

Project Management
JMD offers a Project Management and Control System
that allows us to monitor and control schedules and
budgets in a timely manner. JMD’s system is a monthly
Project Management Report containing the following:

Design Status Report - Arranged by task, this report
discusses budget and schedule; design problems
which need to be resolved; coordination required
between the project team, the client staff and other
agencies; and actual versus planned progress.

Project Control Report - This is a customized report
which tracks budget and schedule to meet the specific
project needs to avoid delays. Delays can be avoided
by performing the following project management
techniques:

1. Plan realistically.

2. Use accurate budget and schedule reports.

3. If behind schedule, stop the project, reassess
staffing and schedule needed to recover, assign
your best sharpshooters, give them a very tight
schedule with overtime and direct them to
recover.

Project Scope, Schedule and Cost
Control
The monitoring and controlling of
project scope, schedule and cost will
provide a means to ensure that the
proposed work plan is implemented
in an efficient and timely manner.

Initially, the scope of work will be carefully negotiated with the City to ensure that we understand your intent
and expectations for the project. The negotiated scope
will be translated into a written format with identified budgets, milestones and deliverables. Anticipated
exclusions and items to be provided by the City,
Caltrans and other public agencies will be defined,
reviewed and discussed.

Critical Path Method (CPM) Schedule
JMD has in-house staff with expertise in Microsoft
Project Planner. A comprehensive project schedule will
be initiated by our Project Manager and will serve as
the controlling document for tracking progress of the
work. This schedule will form the framework for
measuring our actual performance to planned
performance and can be used for periodic updating of
the City's work plan and financial planning. The project team will meet prior to beginning work on the project to collectively determine the smaller work tasks required
to complete the major work activities as established in the scope of work. A sequencing plan of these smaller
work tasks, using precedence format, will be
developed which, in turn, will determine the overall
schedule.

Project Control Report
Prior to beginning the project, the Project Manager will prepare the Project Control Document which defines
major tasks, subtasks, milestone submittals and task
budgets. This information is entered into our
centralized accounting system that will provide the
Project Manager with a weekly report of project budget
status based on weekly time cards and direct expense
information. The Project Manager will estimate project
completion weekly and compare the estimate with the
actual project expenditures to date. This comparison
gives a "snapshot" project cost evaluation on a weekly
basis. The Project Manager, with assistance from the
Project Engineers and subconsultants, will prepare a
monthly cost-to-complete estimate that is a valuable
tool in keeping the project on budget and validating the Project Manager's estimate of project progress.

Scope of Services
JMD will provide support stated under following tasks
listed below:

Task 1 – Project Management, Meetings and
Coordination
JMD will meet with City staff and finalize the scope for the pool upgrades, establish key communication
personnel, refine schedules and get better handle on
the required design-built design criteria. After review of the process to be followed, agreement will be reached
on the design build concept and schedule that would
meet all the requirements anticipated by the City staff.

Meetings between the City and JMD will be held to
resolve issues or hangups and keep the project moving
forward for successful completion.

Task 2 – Research and Data Collection
JMD will obtain existing “as-built” plans, data, and
documents to become familiarized with existing
Page | 8
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
conditions of pool equipment and compile all items
requiring upgrades for smooth pool operation.

Task 3 – Prepare Design Built RFP
JMD will prepare one (1) design build RFP for
Gonzales Park Pool and Lueders Park Pool. The RFP
will follow standard City format and requirements.

Phase I and Phase II tasks are to be included in one
RFP along with the start and end time schedule for
completion of both phases.

Task 4- Bidding Support and Selection
JMD will assist the City in the bidding process and
provide responses to Requests for Information (RFI’s)
posted by bidders. JMD will assist the City with the
selection of the Design-Build Contractor.

Task 5 – Review Design Build Plans, Specifications
and the Estimates
JMD will review plans, estimates and specifications for the subject project relying on similar projects within the City. JMD will support City with review and approval of the design plans prepared by the designer for the
subject project.

Task 6 – Construction Support
JMD will assist the City during construction activities by providing the following services:
• Address Questions During Construction
• Final Punch List items and Completion
• Preparation of As-Built Drawings
Task 7 – Project Close-out
JMD can assist the City with all the paperwork required to successfully complete the project.

Page | 9
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
IV. Proposed Staffing
The JMD Team offers a comprehensive mix of management insight and multidiscipline technical expertise to successfully anticipate and handle the various needs of the City’s project.

The JMD Team, illustrated in the organizational chart located in Figure 1 on the following page, consists of a small “team of local experts” to handle project needs in a strategic manner. We offer a wide spectrum of services and multidiscipline capabilities complemented by City of Compton experience to meet all aspects of the City’s project requirements for consistency and continuity.

Our team is built on the notion of offering our best local talent to ensure the City and each project receive optimal value. In addition, our staff are highly committed and available to assist the City and this project without interruption from start-up to completion.

Meet the Project Manager
Assigned to this important project is one
of our most qualified, experienced, and
local Project Managers, Mr. Deepak
Solanki, with over 32 years of experience
assisting local agency Land Development
Divisions with plan reviews for new
developments and has managed
numerous Capital Improvement Projects
for public works departments. He has
extensive experience in the design and plan review of diverse civil engineering projects, such as parks, street, sewer, grading, flood control projects, backbone utility layout and utility relocation. As Project Engineer and Project Manager, he has prepared design plans for single family residential subdivisions, commercial, industrial, educational facilities and Air Force/Naval Base facilities including underground utilities. He is familiar with right of way acquisition research, temporary construction easement documents, legal descriptions/plats, surveying, cost estimates and quantity take-offs.

As Project Manager, Mr. Solanki will lead the team and be the primary contact with the City. With his extensive municipal experience, Deepak understands key stakeholders involved and will be responsible for leading team activities and meetings, providing project direction and overseeing work from project inception to completion. He can be reached at (909) 268- 7639 or via email at [email protected].

Key Personnel Organization
The JMD team organization of the proposed personnel is
illustrated in Figure 1 on the next page, followed by the JMD team roles and availability matrix listed in Table 1. JMD’s Project Manager and Key Personnel are committed and available to serve on the project from start-up to completion.

JMD TEAM BRINGS THE CITY:
• Project Delivery – Project history and
state of the art solutions to start
running for timely delivery to benefit all
parties.
• Constructability – A Team with a
record of minimal to no change orders.
• Innovation and Value – Innovative,
cost effective and responsive
solutions.

Highlights:
• 32 Years of Transportation Experience
• Extensive Municipal Experience
Education:
• MS, University, Faculty of Technology
and Engineering
• BS, Civil Engineering, 1982
Page | 10

1. Executive Summary
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Figure 1 – Organizational Chart
JMD Team Availability
Table 1 below lists the JMD team’s current workload and time available to assist the City with this important project.

Resumes for Key Personnel are located on the following pages.

Table 1 – Current Workload and Availability

PERSONNEL / PROJECT ROLE CURRENT WORKLOAD AVAILABILITY
Juan M. Diaz, MBA, PE
Principal-in-Charge
 Compton Blvd Rehabilitation, City of Compton (15%)
 Alameda Street Widening, LABOE (10%)
 Radio Road At-Grade Crossing, City of Corona (15%)
60%
Algis J. Marciuska, MBA, PE
QA/QC Manager
 Glendora On-Call Engineering, City of Glendora (20%)
 Durfee Avenue Project, City of Pico Rivera (20%)
60%
Deepak Solanki
Project Manager
 On-Call Engineering Services, City of Brea (20%)
 Glendora On-Call Engineering, City of Glendora (20%)
60%
Jasmine Felix
Administration/Clerical Support
 Admin/Marketing/Project Support (30%) 70%
D. Solanki | p. 1
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Deepak Solanki
Project Manager
Mr. Solanki has over 32 years of experience assisting local agency Land Development Divisions with plan reviews for new developments and has managed numerous Capital Improvement Projects for public works departments. He has extensive experience in the design and plan review of diverse civil engineering projects, such as water main, storm drain, sewer, reservoirs, parks, street, grading, flood control projects, backbone utility layout and utility relocation. As Project Engineer and Project Manager, he has prepared design plans for single family residential subdivisions, commercial, industrial, educational facilities and Air Force/Naval Base facilities including underground utilities. He is familiar with right of way acquisition research, temporary construction easement documents, legal descriptions/plats, surveying, cost estimates and quantity take-offs.

Relevant Experience
City Engineering Services – City of Brea
Serving as Plan Reviewer/Project Manager, Inspector responsible for plan checking, project management and construction observation of grading and drainage improvement plans for subdivision and food distribution facilities as well as transportation facilities. Responsibilities entail assisting in generating Conditions of Approvals for different commercial, industrial, and Subdivision Projects. Providing review comments for Capital Improvement Projects (CIP), and reviewing plans that involve improvements within the public right-of-way. The projects include street overlay, widening projects, and Lambert/I-57 Freeway Interchange improvements. The responsibilities also entail reviewing traffic control plans for projects initiated by Time Warner Cable, Southern California Edison, AT&T, and Southern California Gas Company.

Valencia Reservoir Rehabilitation – City of Brea
Served as Construction Inspector overseeing the expansion and rehabilitation of the Valencia Reservoir located at the northeast corner of the City of Brea. The reservoir has a capacity of 10 million gallons and is over 60 years old. The project's main focus was to perform major rehabilitation improvements to keep the reservoir in service and meet the current growth in the City of Brea.

Water Main Replacement Rancho California Water District – City of Temecula
Served as Construction Inspector responsible for the inspection related to the construction of a 30-inch water main for Rancho California Water District in Deluz Area (Riverside County). The water main served as a replacement to the old aging water main serving avocado groves in the area.

Compton Boulevard, HSIP Cycles 7 and 8 Safety Enhancement Projects – City of Compton
Serving as Project Engineer responsible for preparing preliminary and final design plans for Highway Safety Improvement Program (HSIP) and Title
Senior Project Engineer
Years of Experience
32 Registration
Engineer-in-Training, #113733
Education
• B.S., Civil Engineering, 1982,
M.S., University, Faculty of
Technology and Engineering
Affiliations
• American Society of Civil
Engineers
• American Railway Engineering
and Maintenance of Way
Association
D. Solanki | p. 2
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
rehabilitation improvements along Compton Blvd, between the eastern city limit and the western city limit (approximately 3 1/2 miles) in the City of Compton.

The City secured HSIP funds to reconstruct Compton Boulevard, within City boundaries with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads. The additional improvements will focus primarily on improving safety through roadway paving which is in poor condition as well as improving raised median islands, adding Class II bicycle lanes and enhancing pedestrian crossings, as well as improving some parkways, sidewalks and curb ramps which do not meet ADA standards.

Design, Construction Management and Inspection for Local Streets Rehabilitation Program – Phase I, Zone 24 & Miscellaneous Streets, City Project No. 7924 – City of Norwalk Served as Technical Advisor developed design plans, specifications and estimates for the rehabilitation of several residential streets in the City’s Zone 2 in the southeastern portion of the City of Norwalk. The project involved developing pavement design strategies as well as designing street rehabilitation improvements including pavement reconstruction and overlays as well as curb and gutter, sidewalk, driveways, curb ramps, street lighting and traffic signal interfaces. Due to the extremely flat conditions of the area, several ponding areas are being eliminated by adjusting street profiles and providing new compacted subgrade where settlement has occurred. The project involved utility coordination as well as close coordination with the City, local schools and residents in the area.

Alameda Street Widening from 300’ South of Pacific Coast Highway to Anaheim Street, City of Los Angeles Serving as Project Engineer. JMD is responsible for providing civil engineering design services for the widening of Alameda Street from 300’ south of Pacific Coast Highway to Anaheim Street in the Wilmington community of the City of Los Angeles. The project will widen and upgrade a 0.68-mile section of Alameda Street, the gateway to the Ports of Los Angeles and Long Beach, to a modified Boulevard II, increasing the number of lanes in each direction from two to three.

La Habra/UPRR (“OC Loop”) Bike Trail – City of La Habra Served as Project Engineer responsible for providing professional engineering services for the design of the La Habra Union Pacific Rail Line Bikeway Project, from the west City limit to the east City limit. The La Habra bikeway will eventually connect to future bikeways to the west in the City of Whittier (Greenway Trail) and to the east to the City of Brea's bikeway as part of OCTA's Regional Commuter Bikeway Priorities and Orange County Loop Project. Project tasks included preliminary and final engineering phases including conceptual design, preparation of environmental documents, schematic design, right-of-way engineering maps and necessary legal descriptions, as well as preparation of final construction plans, specifications and cost estimates. The project included bikeway alignment, drainage, traffic signal, and structural plans for the project.

The Tracks at Brea/UPRR (“OC Loop”) Bike Trail – City of Brea Served as Project Engineer responsible for the analysis and design of the drainage element of the Brea/Union Pacific Rail Line Bikeway Project from the west City limit to the Brea Wash. The Brea bikeway will eventually connect to future bikeways to the west in the City of La Habra as part of OCTA's Regional Commuter Bikeway Priorities and Orange County Loop Project. The project tasks included hydrology analysis, preliminary and final engineering phases including conceptual design, preparation of environmental documents, schematic design, right-of-way engineering maps and necessary legal descriptions. The project included paved bikeway, landscaping, hardscaping, drainage, traffic signals and one bridge.

Ortega High School Elsinore Valley Municipal Water District – City of Lake Elsinore Served as Construction Inspector responsible for the inspection of 1,200 feet of a 12-inch sewer extension for Ortega High School.

Waterline Improvements – City of Chino Hills
Served as Construction Inspector responsible for overseeing the construction of approximately 2,000 feet of a 20-inch diameter water main on Chino Avenue for the City of Chino Hills, crossing San Antonio Creek Bridge.

Aqua Dulce Backbone Storm Drain Facility – City of Aqua Dulce Served as Construction Inspector responsible for the inspection related to the construction of approximately 6,500 feet of a 48-inch storm drain backbone drainage facility to provide relief to the existing 36-inch storm drain.

D. Solanki | p. 3
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Indian Street and Cottonwood Avenue – City of Moreno Valley Served as Construction Inspector responsible for the inspection related to the construction of a Class II and Class III bikeway and street widening. The improvements consisted of removal and replacement of curb, gutter, sidewalk, curb ramps, and driveways; relocation of traffic signals, power poles, light poles, fire hydrants, and utility boxes; and asphalt paving, traffic striping, and other appurtenant site improvements.

On-Call Engineering Services – City of Glendora
Serving Sr. Project Engineer responsible for providing professional on-call engineering services to the City of Glendora on a task order basis. Services include on-site and offsite services including project management, plan checking as well as street, traffic and utility design and construction inspection.

City Engineering Services – City of South Gate
Served as Plan Reviewer/Project Manager responsible for reviewing comments for Capital Improvement Projects (CIP). The projects included street widening, parks, sewer master plan, ADA improvements, and Firestone Bridge widening Project over the Los Angeles River. Assisted in generating Conditions of Approvals for different commercial and industrial projects. The responsibilities also entailed managing Capital Improvement Projects, such as ADA Transition Plan, Citywide ADA ramps improvements, and Traffic Signal ADA improvements on Tweedy Boulevard at State Street and California Avenue
FY 16-17 Annual Pavement Rehabilitation – City of Manhattan Beach Served as Project Engineer/Construction Manager responsible for managing a $2.7 Million Citywide Street Improvement Program for the City of Manhattan Beach. Specifically, the scope of work included the reconstruction of roadways throughout the City which included sidewalks, driveway approaches, curb, gutter, cross-gutter, and ADA curb ramps; the complete restoration of roadway structural sections; grind and overlay; local R&R; crack seal and slurry seal; and traffic striping and signage.

City Engineering Services – City of Industry
Served as Project Engineer responsible for performing engineering plan review and plan checks for all the improvements within public right of way. Also responsible for reviewing and approving design changes during the construction phase for Puente Grade Separation and Fullerton Grade Separation Projects; reviewing improvement plans for encroachment permits; assisting the Planning Department; and providing engineering conditions of approval for development projects. Responsibilities also included reviewing Sewer Capacity Study Reports; Industrial Waste Discharge application (coordination with L.A. County Sanitation District); Domestic Waste Discharge; managing the design and coordination with different stake holders; approval of CIP Projects; and provided front counter support at the City Hall. Acted as the City’s representative and played an important role as a Construction Administrator for projects under construction, three of those projects being grade separation projects at Puente Avenue, Fullerton Road and Fairway Drive which exceeded $80M. He assisted design firms with their technical inquiries and provide guidance to expedite preparation of design plans for new development projects.

J. Diaz | p. 1
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Juan M. Diaz, MBA, PE
Principal-in-Charge
Mr. Diaz has over 38 years of professional engineering experience in the transportation planning and engineering industry. His extensive expertise in highway, traffic, rail and transit engineering has resulted in his management of major highway and rail transit projects in Southern California. Mr. Diaz has conducted studies and prepared designs for numerous agencies including Caltrans, Metro, SCRRA, OCTA, CPUC, NDOT, County of Los Angeles, County of Orange, and numerous local agencies as well as local railroads throughout California and Nevada. His experience includes the analysis and development of PS&E packages for highway, rail transit and freight rail corridor projects.

As a former Metrolink representative and on-call railroad consultant, his experience in coordination with the CPUC has led to more than 500 at-grade crossing and grade separations within the Metrolink systems. His diverse background and experience along with his strong ability in leading community outreach/consensus building efforts has resulted in his direct involvement in the analysis of train/vehicle/pedestrian circulation issues at rail/highway interfaces including interchanges, grade crossings and stations as well as quality of life projects associated with mitigating noise along rail corridors. Mr. Diaz is a former Cal Poly Pomona faculty known for his ability to work and communicate with bilingual communities on sensitive projects.

Relevant Experience
Guadalupe Park Trail Design for Park Rehabilitation – City of La Habra
Served as Project Manager and PIC responsible for providing professional engineering services for the Guadalupe Park Trail Design for Park Rehabilitation Project in the City of La Habra. The purpose of this improvement project is to encourage the use of active modes of transportation; increase trips accomplished by biking and walking; and enhance safety and connectivity by creating a Class I Multi-Use Path through Guadalupe Park and the adjacent City-owned land west of Guadalupe Park. The current trail alignment contains numerous exaggerated sag curves; the City wishes to reduce these curves to be less pronounced and improve the rideability of the trail improvements.

Westcliff Street Light Improvement and West Bonita Creek and San Miguel Park Lighting Replacement Project – Newport Beach Served as Principal-in-Charge responsible for providing professional engineering design services for the proposed street lighting improvement in the Westcliff area and the lighting replacement project at Bonita Creek Park and San Miguel Park. The project included replacement or refurbishment of existing street light facilities within the Westcliff area. This project involves approximately 160 incandescent lamps and approximately 30,000 linear feet of conduit and wiring. In addition to the street lights within the Westcliff area, the existing steel street lights at Bonita Creek Park and San Miguel Park were replaced.

Title
President/Chief Executive Officer
Years of Experience
38 Registration
Registered Professional Engineer, CA,
#C50813
Education
• M.B.A., Business Administration,
1991, California State Polytechnic
University, Pomona
• B.S., Civil Engineering, 1986
California State Polytechnic
University, Pomona
• A.S., Building Technology, 1982
Don Bosco Technical Institute,
Rosemead
Affiliations
• American Society of Civil
Engineers
• Institute of Transportation
• American Railway Engineering
and Maintenance of Way
Association
J. Diaz | p. 2
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Telegraph Road Rehabilitation – Commerce
Served as Project Manager responsible for preparing preliminary and final design plans for the rehabilitation of Telegraph Road, between Atlantic Boulevard and the Rio Hondo Channel (approximately 3 miles) in the City of Commerce. Rehabilitation improvements included street reconstruction and resurfacing. In addition, the project included surface improvements at the Los Nietos Subdivision, a Union Pacific Railroad (UPRR) grade crossing, towards the east end of the project. JMD was responsible for developing roadway, "hot spot" intersection, grade crossing, signing and striping and traffic control plans for the City and Caltrans due to the proximity to I-5. Close coordination with Metro (funding), Caltrans, UPRR, and the California Public Utilities Commission (CPUC) was an important element of the project.

Commerce Way Streetscape – Commerce
JMD is responsible for designing a 0.2 mile long streetscape project between Eastern Avenue and Washington Boulevard in downtown Commerce. The beautification project includes roadway rehabilitation consisting of pavement, curb and gutter, sidewalk, signage and striping improvements, as well as the elimination of two at-grade crossings operated by BNSF. Aesthetic elements included decorative lighting, landscaping, irrigation, and raised median islands to enhance the overall street experience. Median islands had to be limited to maintain access to nearby industries and businesses
Compton Boulevard, HSIP Cycles 7 and 8 Safety Enhancement Projects – City of Compton Serving as Project Manager responsible for preparing preliminary and final design plans for Highway Safety Improvement Program (HSIP) and rehabilitation improvements along Compton Blvd, between the eastern city limit and the western city limit (approximately 3 1/2 miles) in the City of Compton.

The City secured HSIP funds to reconstruct Compton Boulevard, within City boundaries with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads. The additional improvements will focus primarily on improving safety through roadway paving which is in poor condition as well as improving raised median islands, adding Class II bicycle lanes and enhancing pedestrian crossings, as well as improving some parkways, sidewalks and curb ramps which do not meet ADA standards.

Rehabilitation improvements include existing pavement condition review and geotechnical analysis. The project includes 139 curb ramps to be reconstructed. Close coordination with Metro (funding), UPRR and the California Public Utilities Commission (CPUC) is needed to coordinate grade crossing improvements at Willowbrook Avenue and Alameda Street
Central Avenue Street Corridor Transportation Study/PSRE – Compton Serving as Principal–in-Charge responsible for preparing a Transportation Study/PSRE and sought local, State and Federal transportation funds for the improvement of Central Ave Corridor between Artesia Blvd and El Segundo Blvd. in the City of Compton. This Transportation Study/PSRE and Conceptual Plans, considered Phase I of the project, will allow the City to evaluate transportation needs in the key corridor and provide base conceptual engineering plans for the redesign of the corridor focusing on a safe, sustainable, integrated and efficient transportation system. JMD developed three alternatives which consider conventional, complete and green street elements to best address local access and circulation needs on Central Avenue. Such mix of alternatives also increased the likelihood of obtaining project funding.

A. Marciuska | p. 1
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
Algis J. Marciuska, MBA, PE
QA/QC Manager
Mr. Marciuska has over 38 years of professional engineering experience in the civil engineering profession. He has extensive experience in the design of streets and highways, drainage systems, bridges, culverts, public works facilities, institutional projects, signalization projects, geometric design, land development projects, subdivision mapping, construction surveys, construction engineering, and project management. He has prepared many plans, specifications, estimates, and studies for the County of San Bernardino, San Gabriel Valley cities, County of Los Angeles, County of Orange, and City of San Diego.

Relevant Experience
On-Call Engineering Services – City of Glendora
Serving Sr. Project Manager currently providing on-site project management, site development and transportation plan reviews as well as monitoring MS4 drainage requirements. Also, providing design support on the current Metro Gold Line Foothill Extension Project currently in construction within the City of Glendora. This assignment requires coordination with City staff, outside agencies and consultants.

On-Call Project Management Services – City of Pico Rivera Serving as Project Manager providing professional project management services in support of three projects for the City of Pico Rivera including the Passons Blvd. Investigation and Basis of Design Report, the Bartolo Storm Drain Improvement Design, and the Durfee Avenue Miscellaneous Transfer Drain Design.

On-Call Engineering – Guadalupe Park Trail and Rehabilitation – City of La Habra
Served as QA/QC Manager. JMD was responsible for conducting final design for the Guadalupe Park Trail Design for Park Rehabilitation Project in the City. The purpose of this improvement project is to encourage the use of active modes of transportation. This park links to the City’s UPRR Bikeway Project in UPRR property. This trail is part of the Orange County Loop, a 66-mile multipurpose trail serving 17 cities in the County.

City Engineering Services – City of Brea
Serving as Sr. Civil Engineer proving professional engineering services to the City of Brea on an as-needed basis. Responsibilities entail assisting in generating Conditions of Approvals for different commercial, industrial, and Subdivision Projects. Providing review comments for Capital Improvement Projects (CIP), and reviewing plans that involve improvements within the public right-of-way.

Local Streets Rehabilitation Program – Phase 2, Zone 3 – City of Norwalk
Serving as QA/AC Manager as JMD is responsible for developing design plans, specifications and estimates as well as construction management services for the City’s Zone 3 Local Streets Rehabilitation Program. The Title
Senior Project Manager
Years of Experience
38 Registration
Registered Civil Engineer, CA, #44846
Education
• M.B.A., Business Administration,
1991, California State Polytechnic
University, Pomona
• B.S., Civil Engineering, 1986
California State Polytechnic
University, Pomona
• A.S., Building Technology, 1982
Don Bosco Technical Institute,
Rosemead
Affiliations
• Member, American Society of Civil
Engineers
• Member, Institute of
Transportation Engineers
• Member, American Public Works
Association
• Member, Urban Land Institute
• Life Member, Chi Epsilon, National
Civil Engineering Honor Society
• Life Member, Tau Beta Pi,
National Engineering Honor
Society
A. Marciuska | p. 2
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
project involves developing pavement design strategies as well as designing street rehabilitation improvements including pavement reconstruction and overlays as well as curb and gutter, sidewalk, driveways, curb ramps, street lighting and traffic signal interfaces. The project involves utility coordination as well as close coordination with the City, local schools and residents in the area
Compton Boulevard, HSIP Cycles 7 and 8 Safety Enhancement Projects – City of Compton Serving as Senior Civil Engineer responsible for preparing preliminary and final design plans for Highway Safety Improvement Program (HSIP) and rehabilitation improvements along Compton Blvd, between the eastern city limit and the western city limit (approximately 3 1/2 miles) in the City of Compton.

The City secured HSIP funds to reconstruct Compton Boulevard, within City boundaries with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads. The additional improvements will focus primarily on improving safety through roadway paving which is in poor condition as well as improving raised median islands, adding Class II bicycle lanes and enhancing pedestrian crossings, as well as improving some parkways, sidewalks and curb ramps which do not meet ADA standards.

Alameda Corridor East San Gabriel Trench Grade Separation Project – City of San Gabriel Served as City Project Engineer responsible for providing planning, environmental review, plan checking, permitting, inspection, construction management and inter-agency coordination for the $300 million project consisting of four grade separations and a 1.5-mile-long trench in the Union Pacific Railroad right of way in the cities of San Gabriel, Alhambra, Rosemead and Los Angeles County unincorporated community of East San Gabriel.

Alameda Street Widening from 300’ South of Pacific Coast Highway to Anaheim Street, City of Los Angeles Serving as QA/QC Manager, JMD is responsible for providing civil engineering design services for the widening of Alameda Street from 300’ south of Pacific Coast Highway to Anaheim Street in the Wilmington community of the City of Los Angeles. The project will widen and upgrade a 0.68-mile section of Alameda Street, the gateway to the Ports of Los Angeles and Long Beach, to a modified Boulevard II, increasing the number of lanes in each direction from two to three.

Design, Construction Management and Inspection for Local Streets Rehabilitation Program – Phase I, Zone 24 & Miscellaneous Streets, City Project No. 7924 – City of Norwalk Served as QA/AC Manage. JMD was responsible for developing design plans, specifications and estimates as well as construction management services for the rehabilitation of several residential streets in the City’s Zone 2 in the southeastern portion of the City of Norwalk. The project involved developing pavement design strategies as well as designing street rehabilitation improvements including pavement reconstruction and overlays as well as curb and gutter, sidewalk, driveways, curb ramps, street lighting and traffic signal interfaces. Due to the extremely flat conditions of the area, several ponding areas were eliminated by adjusting street profiles and providing new compacted subgrade where settlement has occurred. The project involved utility coordination as well as close coordination with the City, local schools and residents in the area.
2021 Local Road Safety Plan – City of San Gabriel
Served as QA/QC Manager. Provided support services and QA/QC review for the city-developed Local Road Safety Plan (LRSP) for the City’s Engineering Division. Support services included preparing a detailed inventory of study intersections and providing suitable safety measures and improvements as well as identifying existing safety issues to raise the level of safety for San Gabriel streets and intersections including school zones and busy commercial districts.

QA/QC included review of two versions of the LSRP documents, graphics, and accident/citation data.

Page | 18
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
V. Cost Proposal
Per the direction of the City’s RFP, JMD has prepared the attached cost proposal to perform the aquatic facility construction consulting services for the activity levels described in said RFP.

Juan Steve Algis Daniel

PRINCIPAL PROJECT QA/QC ADMIN/

DESCRIPTION IN CHARGE MANAGER MANAGER CLERICAL
TASK Rates $259.21 $187.45 $245.82 $85.71
1 Project Administration, Meetings and Coordination 2 36 8 12 58 $ 337.50 $ 10,599.00 * Deliveries/Mileage/Reproduction 2 Research and Data Collection 4 36 8 8 56 $ - $ 10,437.00 * Deliveries/Mileage/Reproduction 3 Prepare Design Built RFP 4 40 12 12 68 $ - $ 12,513.00 * Deliveries/Mileage/Reproduction 4 Bidding Support and Selection 2 36 8 12 58 $ - $ 10,262.00 * Deliveries/Mileage/Reproduction 5 Review Design Built Plans, Specifications and Estimates 4 180 8 24 216 $ - $ 38,801.07 * Deliveries/Mileage/Reproduction 6 Construction Support 2 90 8 12 112 $ 307.80 $ 20,691.60 * Deliveries/Mileage/Reproduction 7 Project Close-out 0 32 4 20 56 $ - $ 8,696.00 * Deliveries/Mileage/Reproduction 18 450 56 100 624
$ 645 $ 112,000.00
Notes:
a Rates are subject to a 5% annual increase on January 1 without adjustment to the total fee. b Assumes up to 3 meetings for Task 1 thru Task 3
feeproposal.xls

TOTAL ESTIMATED DESIGN COST

REMARKS
TOTAL
LABOR
HOURS
March 7, 2024

TOTAL ESTIMATED LABOR HOURS
TOTAL
COSTS
Cost Proposala-b
City of Compton
DIRECT
COSTS*
Submitted by: JMD
Aquatic Facility Construction Consultant
Page | 20
Proposal to Provide Aquatic Facility Construction Consultant Services Covering the City of Compton Pools
VI. Additional Information
JMD has provided proof of insurance as additional information. Please see the attached Certificate of Insurance used for proposal purposes only.

PLANNING ENGINEERING MANAGEMENT ||
18645 East Gale Avenue, Suite 212
City of Industry, CA 91748-1363
T 626.820.1137 F 626.820.1136
www.jmdiaz.com
3707 W. Garden Grove Blvd Ste #100
Orange, CA 92868
714.568.1010 phone
714.568.10288 fax
www.csgengr.com

PROPOSAL TO THE
City of Compton
Aquatic Facility Construction Consultant Services
M a r c h 7 , 2 0 2 4

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
Table of Contents
SECT ION 1 Firm Profile 3
SECT ION 2 Firm Experience 6
SECT ION 3 Staff Communication 9
SECT ION 4 Key Personnel 11
SECT ION 5 Cost 12
SECT ION 6 Additional Information 13
SECT ION 7 Appendix: Resumes of Key Personnel 18

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
3707 W. Garden Grove Boulevard, Ste. 100, Orange, CA 92868 phone 714.568.1010 | fax 714.568.1028 | www.csgengr.com Cover Letter
March 7, 2024
Bryan Spragg,
Director of Recreation
City of Compton
205 South Willowbrook Avenue, Compton, CA 90220
RE: Request for Qualifications (RFQ) to Provide Aquatic Facility Construction Consultant Services
CSG Consultants, Inc. (CSG) is writing to express our interest in providing consultant project and construction management services as outlined in the Request for Qualifications (RFQ) for Aquatic Facility Construction Consultant Services, dated February 14, 2024. With our extensive experience in project and construction management and a track record of successful project delivery for municipalities throughout California. We are confident in our ability to contribute to the success of your project.

For this project, I will serve as the authorized representative (primary contact) for this contract. My role will be to oversee and support the team throughout the contract. My contact information is:

Peykan Abbassi, PE | Vice President
phone (714) 568-1010 | [email protected]
cell (818) 800-6326
Over the past 33 years, CSG has managed a diverse range of construction and infrastructure projects and possesses a deep understanding of project delivery, from initial scoping and feasibility studies to design, construction, and closeout. Our ability to develop comprehensive project plans, manage budgets and schedules, mitigate risks, and coordinate multidisciplinary teams has consistently resulted in the timely and cost-effective completion of projects.

Key qualifications and attributes that CSG would bring to the City of Compton include:
• Construction Administration and Monitoring: a proven ability to lead projects from initiation to completion, ensuring adherence to scope, schedule, and budget. • Quality Assurance: Prioritizing quality control and assurance throughout the project lifecycle. • Team Leadership: A collaborative leadership style that motivates project teams to perform at their best.

Based on our understanding of your objectives for consultant services to update the Lueders Park swimming pool and Gonzalez Aquatic Center, we are confident that our skills and experience align perfectly with your requirements. We are eager to contribute to your project's success and drive tangible results for the City. Please find attached our detailed Proposal, references, and comprehensive portfolio of past projects for your review.

Several staff members have extensive experience working with the City of Los Angeles as Project and Construction Managers prior to their employment with CSG to include Design-Build projects delivery.

Thank you for considering our application. I look forward to the possibility of working with you and your team.

Should you require any further information or wish to arrange an interview, please do not hesitate to contact me.

Sincerely,
Peykan Abbassi, PE
Vice President, CSG Consultants, Inc.

CSG AT A GLANCE
▪ Multidisciplinary
building, engineering,
planning,
environmental
construction
management, and plan
check services
▪ Founded in 1991
▪ 9 offices
▪ 350+ employees
▪ 100% employee-owned

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
4 Firm Profile
CSG Consultants, Inc. (CSG) is a California company with its corporate office in Foster City. Founded in 1991, CSG has built its reputation around providing both as-needed and project-specific professional engineering services exclusively to public agencies. Many of the individuals at CSG have previously worked for a public agency at some point in their career and as such are keenly aware of the standards, regulatory processes, constraints, and political undertones by which a project is completed.

F I R M S U M M A R Y
LEGAL NAME OF FIRM: CSG Consultants, Inc.

POINT OF CONTACT: Peykan Abbassi, PE | Vice President
LOCAL OFFICE: 3707 W. Garden Grove Boulevard, Suite #100, Orange, CA 92868 (714) 568-1010 phone | (714) 568-1028 fax
HEADQUARTERS 550 Pilgrim Drive, Foster City, CA 94404
www.csgengr.com • [email protected]
YEARS IN BUSINESS: 33 • Founded in 1991
EMPLOYEES: 350+
TYPE OF ORGANIZATION: California Corporation • Incorporated June 15, 2000 Federal ID: 91-2053749

S T A F F C O M P O S I T I O N
Our professional municipal services staff consists of:
 Construction Managers  Civil Engineers
 Construction Inspectors  Transportation Engineers
 Resident Engineers  CASp Professionals
 Program & Project Managers  Structural Engineers
 Land Development Review Engineers  Building Officials  C.3 Review Engineering & Specialized Inspectors  Building Plan Reviewers  Planning Professionals  Fire Plan Reviewers & Inspectors

F I N A N C I A L S T R E N G T H
CSG was formed in the early 1990s and is an employee-owned, multidisciplinary engineering firm. We have a very stable economic base and workforce within our two primary and complementary service lines, building/fire department services and engineering. CSG has grown steadily in both revenue and staff size, and now has over 350 employees serving customers throughout California and Nevada. We are debt-free and have a commercial bank line of credit that is available to use. In addition, we have no contract defaults, bankruptcies, or mergers and no impending mergers. The company is well positioned to service the City. Upon selection for this contract, CSG can provide further details regarding its financial strength, including reviewed financial statements.

SECT ION 1

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
5 S T A F F W O R K L O A D
The current workload of the staff selected for this project is as follows:

Name / Role Company Certifications Years of
Experience
Anticipated Percentage
of Time on Project
Peykan Abbassi
Point of Contact CSG PE 35 10%
Cyril Charles
Sr. Project Manager CSG PE 30 25%
Paul Young
Construction Manager CSG Licensed Architect 30 65%

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
6 Firm Experience
The CSG employees that will be assigned to this project have experience with using the design-build method as a project delivery tool during their time working for the City of Los Angeles, Bureau of Engineering. In addition, they have extensive experience working with public projects including new and existing renovations for departmental office buildings, police, fire, recreation and parks facilities, and animal shelter facilities for the City of Los Angeles and other cities throughout California.

CSG staff has provided project and construction management services to jurisdictions for capital improvement projects throughout California. Project types include public facilities such as recreation and park facilities, fire stations, and navigation centers (homeless facilities). The following are examples of projects for which CSG have performed similar services. Additional projects and references may be provided upon request. For the resumes of the various team members see Section 6 (Appendix).

SHERWOOD RECREATION CENTER | CITY OF SALINAS, CALIFORNIA Client: City of Salinas
Reference: Luis Ochoa, Sr Community Development Analyst, [email protected] Team Members: Cyril Charles, PE; Gelareh Jokar
Period of Performance: 2023 - Present
CSG offers project management services for the renovation of an approximately 12,895 square feet Sherwood Recreation Center, situated in the City of Salinas, California. This site includes a recreation center and aquatic center on the Salinas Rodeo Grounds. The project primarily targets exterior
enhancements, encompassing ADA accessibility, roofing,
window upgrades, painting, landscaping, parking optimization, integration of ADA-compliant parking and pathways, and
various other construction endeavors. CSG's responsibility entails collaborating with and advising City personnel, overseeing the design team and sub-consultants, and ensuring compliance with all municipal requirements. Tasks also encompass cost estimation, fee negotiation with sub-consultants, request for sub-consultant's proposals, design management, chairing progress meetings, NEPA & CEQA documentation, bid solicitation, and subsequent review.

COMMUNITY SWIM CENTER AND 10 MUNICIPAL BUILDINGS| CITY OF HERCULES, CALIFORNIA Client: City of Hercules
Reference: Jeff Brown, Director of Facilities
Team Members: Peykan Abbassi, PE; Cyril Charles, PE
and Paul Young, Architect
Period of Performance: 2023-2024
CSG provided project management services for a facility condition assessment study and 10-year capital improvement report for 11 buildings owned and operated by the City of Hercules including the Community Swim Center with two pools. This work included site inspections of the site and conditions of all major building components and systems for each facility, review of pertinent documents such as as-built drawings, building records, construction documents, building codes and violations, and maintenance records, and data analysis and calculation based on our engineering expertise and experience, our field observations, and accepted reference guides such as BOMA and RS Means.

SECT ION 2

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
7 CHINATOWN NAVIGATION CENTER | CITY OF SALINAS, CALIFORNIA Client: City of Salinas
Reference: Luis Ochoa, Sr Community Development Analyst, [email protected] Team Members: Cyril Charles, PE; Gelareh Jokar
Period of Performance: 2023 - Present
CSG provides project management services for the renovation of the Chinatown Navigation Center (CNC) situated in Salinas. The CNC serves as a hub for homeless services, catering to around 50 men and women, while also offering shower and restroom facilities for individuals living on the streets within the Chinatown neighborhood. The project scope includes enhancing an existing ADA shower, three standard showers, men’s and women’s restrooms, exterior building signage, and refinishing of existing concrete flooring. CSG's role involves collaborating with and advising City personnel, overseeing the design team and sub-consultants, and ensuring adherence to all municipal requirements. Responsibilities further encompass cost estimation, negotiating fees with sub-consultants, managing the design process, leading progress meetings, handling CEQA documentation, soliciting bids, and conducting subsequent reviews.

TOWN HALL EXPANSION AND RENOVATION PROJECT | TOWN OF COLMA, CALIFORNIA Client: Town of Colma
Reference: Daniel Barros, City Manager, (650) 997-8318, [email protected] Project Cost/Contract Amount: $18 M/ $850,000
Period of Performance: 2016-2019
CSG provided the Town of Colma with project management and construction management services for the Town Hall Campus Renovation and Expansion project. CSG was actively involved in the project from the planning phase to construction completion.

The work encompassed management of remodeling the existing 1941 building and creating an addition. The addition facilitated 7,000 square feet of new administrative office space and 3,300 square feet of conditioned basement space, which contains record storage, offices, electrical, mechanical and IT rooms. In addition to construction management and inspection, CSG staff assisted with the constructability review, value engineering, RFI’s and submittals, and scheduling and estimating.

NAVIGATION HOMELESS CENTER | CITY OF VALLEJO, CALIFORNIA Client: City of Vallejo
Reference: Melissa Tigbao, Public Works Director (707) 648-4316, [email protected] Team Members: Peykan Abassi, PE; and Cyril Charles, PE
Period of Performance: 2021–Present
CSG provides project and construction management services for the design and construction of a Navigation Center in the City of Vallejo with an approximate budget of $8 million. The project includes real estate transaction agreements; on and off-site improvements; a Sprung Structure dormitory that sleeps 125 individuals; a Sprung structure community services building that provides operation, dental and medical services; and separate shower and restroom facility structures. CSG role is to work with and advise the City staff, and to manage the design team,

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
8 contractor, operators to ensure that the project is completed on time and within budget. The duties also include cost estimating; negotiation of subconsultants’ fees; managing the design and construction of the project; leading weekly meetings with the design team, the contractor and City staff; and communicating with operators and services providers of the site.

SOUTH BAY REGIONAL PUBLIC COMMINICATIONS AUTHORITY| CITY OF HAWTHORNE, CALIFORNIA Client: City of Hawthorne
Reference: Executive Director, [email protected]
Team Members: Peykan Abassi, PE; Cyril Charles, PE and Paul Young, Architect
Period of Performance: 2023
CSG provided facility condition assessment services for the City of Hawthorne “South Bay Regional Public Communications Authority” that houses essential dispatch services for various cities throughout the South Bay region. This work included site inspection(s) to observe the general site improvements and conditions of all major building systems, review of pertinent documents such as drawings, as built, building records, construction documents, building codes and violations, and maintenance records, and data analysis and calculation based on our engineering expertise and experience, our field observations, and accepted cost guides such as BOMA and RS Means.

PUBLIC FACILITY PROJECTS | CITY OF VENTURA, CALIFORNIA
Client: City of Ventura
Reference: Barbara McCormack, Director of Facilities (815) 652-4545, [email protected] Project Cost/Contract Amount: Ongoing/On-Call
Team Members: Peykan Abassi, PE; and, Cyril Charles
Period of Performance: 2022-2024
CSG is currently conducting project and construction management services for renovation work on the Ventura Police Department, six (6) fire stations, and the Battalion Chief house which serves as the central operations facility for the Fire Department. For the police department, we are tasked with project management activities related to repair and replacement of the existing air handler unit system and mold remediation within the exiting ductwork that require temporary HVAC systems to be installed. This project requires close coordination among stakeholders due to 24/7/365 operation of the facility. CSG is also tasked with managing the design and construction for the complete replacement of the existing HVAC systems for the six (6) fire stations, and the Battalion Chief house. The CSG project team is also tasked with performing a constructability review of the documents to ensure efficient construction with minimum risk of claims and change orders.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
9 Staff Communication
CSG uses a variety of communication modalities to communicate with its clientele and team members as follows:

Email—CSG uses email often to communicate with team members and its clientele.

Project Management Information System (PMIS) — CSG will use a PMIS to facilitate project planning execution, monitoring, and control. This computer-based program serves as a digital command center for project management in maintaining contact and a communication line to the City, team members and stakeholders.

Meetings—CSG will schedule, conduct, and participate in weekly job site progress meeting, plus quality control and special meetings with the City, Consultants, Contractors, and any other stakeholders involved in the Project to discuss such matters as procedures, progress, quality, and scheduling. CSG will prepare and distribute meeting minutes. These meetings may be on-site or virtual via providers such as Teams and Zoom.

Direct Calls—CSG will use a direct call at those times that it is the most appropriate communication based the situation. When a quick answer or message is required because of the urgency of a situation a phone call will be made.

Reports—CSG will create and distribute reports and minutes based on the needs of the project. Typically, there are a variety of reports generated during the progress of a project depending on the audience and the needs of the project. Project status reports are generated to keep stakeholders informed with updates of the costs, risks, schedule, and upcoming milestones within a specific period that are compared against the project plan. CSG will create and distribute reports as required by the City and the needs of the project. CSG can also assist the City with Board or Council Reports if required.

Meeting Minutes will feature the following:
▪ Date, Time and Location of Meeting
▪ Names of the Participants
▪ Agenda Items and Topics Discussed
▪ Action Items
Project Status Reports will have the following features:
▪ Brief Introduction of Topics In the Report
▪ Summary of Completed Work, and Work To Follow.
▪ Project Schedule Update
▪ Budget Status Update
▪ Upcoming Tasks and Milestones
▪ Action Items
▪ Project Risks, Issues, and Mitigation Plans
Construction Weekly Meeting Minutes will have the following features:
▪ Attendees List
▪ Review of Previous Meeting Minutes and Status Update or Response to any Pending Issues ▪ Discussion of Issues, Material Delivery Or Shortages, Site Problems, Shop Drawing Submission and Approvals, Construction Conflicts Etc.
▪ Review of Progress Schedule including Identifying Causes of any Delay ▪ Discussion of New Business including Status of Change Orders In Progress ▪ Contractor Payment Issues Can Be Discussed In General, Especially To Verify the Monthly Cycle of Pencil Copies and Payment Approvals.

SECT ION 3

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
10 ▪ Discussion of Coordination of Owner Supplied Equipment Or Staff Moves As It Relates To Renovation and Occupancy.
▪ Comments and Questions Period.
▪ Time and Place of the Next Meeting.

Board/ City Council Reports will have the following features:
▪ To – (City Board or City Council with Decision and Funding Authority) ▪ From – (City Project Team)
▪ Date – Date of the Meeting
▪ Subject – Project Name, with the Unique Need(s) of the Project Expressed ▪ Recommendations – The items the City Project Team wants the Board or City Council to Approve ▪ Background -
▪ Summary – Synopsis of the actions previously taken with the project. ▪ Funding and Potential Funding

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
11 Key Personnel
Resumes for the following key team members are provided in Section 6:

1. Peykan Abbassi, P.E. – Point of Contact (Principal Engineer)

2. Cyril Charles, P.E. – Sr. Project Manger

3. Paul Young – Construction Manager
SECT ION 4

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
12 Cost
Based on our understanding of the RFP, CSG will assign a Project Construction Manager to provide project management services for 16 hours per week for the total fee of $183,040. For (12) invoices, the monthly fee is $15,253.

This fee proposal is based on the following assumptions:

1. CSG has based the above fee proposal on a project duration for project and construction management services of twelve (12) months.

2. CSG has based the above fee proposal on a project budget for the undefined scope of work of $1,000,000.

3. This fee schedule doesn’t include the provision of an inspector during the construction phase.

Additional time required beyond the hours listed above work will be based on the below schedule of rates.

CSG ENGINEERING RATE SCHEDULE
Professional Engineering Services 2023
Hourly Rate
Principal Engineer $250
Senior Project Manager $235
Construction Manager $185
Asst. Project Manager $155
Document Control $125
All hourly rates include overhead costs including, but not limited to, salaries, benefits, Workers Compensation Insurance, travel, and office expenses. Overtime work will be billed at 1.5x the hourly rates indicated in the table above. On July 1 of each year following the contract start year, CSG will initiate a rate increase based on change in CPI. CSG will mail/email an invoice every month for services rendered during the previous month.

SECT ION 5

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
13 Additional Information
CSG has thoroughly reviewed the City’s Request for Proposals for an Aquatic Facility Construction Consultant to manage the design-build process for the improvements required for swimming pools located at Lauders Park and the Gonzalez Aquatics Center. We fully understand and honor the importance of this project to the Compton community and are committed to providing all necessary project management, construction management and technical expertise to deliver the services that the City requires to ensure the successful delivery of the Project in meeting the City’s scope, budget, and schedule objectives.

P R O J E C T A P P R O A C H
Our approach to this project will include the engagement of City staff and effective teamwork with the selected design-build team and collaboration among other key project stakeholders. We offer a unique experience managing projects that include project team and consultant coordination; project information updates; utility impacts and relocation; design and procurement of temporary recreation facilities; documents review; and full- service staff support during construction.

CSG understands the importance of public information and community outreach in this type of project. As required, we will actively support the City staff and design-build team’s efforts and augment their information flow with tailored and frequent updates to City staff, the City Council, and City boards and commissions as needed. As the design-build team engages the community through design decisions, we will provide regular updates to the City that is vital to the project schedule and the integrity of the City’s decisions.

CSG’s document control is a vital component of Project Management for the project. The assigned project manager will immediately implement an action item tracking system and establish weekly coordination meetings with the City’s project manager.

CSG will thoroughly vet ideas and solutions as the work is occurring to ensure that the project team is not getting out ahead of decision-makers and key stakeholders, and to ensure that participants – at any level of engagement – feel that the process is transparent and that their input will be heard and valued. This is a fundamental CSG approach to project management and will be our commitment to the City.

With this approach CSG has successfully delivered projects of a similar nature. CSG has assembled a team with local expertise and extensive experience in the development and implementation of large public facilities projects. We operate from an office within proximity to City Hall and the project site.

TASK 1 – Project Management, Meetings and Coordination
To begin this task CSG will host an introductory kick-off meeting with City staff and key stakeholders to introduce the CSG project manager and discuss the project. A schedule will be developed for the project and milestones set for the major tasks.

Project Development
Define individual project parameters and scope in coordination with the City and the various agencies; review priorities, opportunities, and constraints as they may impact each project; and provide liaison and coordination with the various agencies for the development of cooperative projects. Administer project compliance with applicable permits, codes, funding requirements, regulations, and entitlements.

SECT ION 6

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
14 TASK 2 – Research and Data Collection
CSG will coordinate with the City to verify that any predesign information such as surveys, soils reports, hazardous material surveys (if necessary), NEPA and/or CEQA documentation is complete readily available for use by the design-build team.

CSG will research the latest trends in public swimming pools materials, equipment and safety procedures with City personnel and the project’s key stakeholders to establish priorities, goals, and objectives for the projects. Assemble related information and develop strategies. Determine the necessary quantitative requirements and limits including limitations set by funding.

TASK 3 - Prepare Design-Build RFP
Project Scope—The Project Manager will prepare a scope of work for the solicitation of project designbuild teams that may include preliminary specifications and estimates for the further development by the selected Design-Build Team.This preliminary scope of work will reflect the needs and desires of the City and its stakeholders in upgrading the two pools.

RFP Documents—CSG will prepare the a draft RFP and issue to the City review and approval. Once the RFP has been approved by the City, CSG will work with the City to upload onto the City’s website for the solicitation of a design-build team.

TASK 4 – Bidding Support and Selection
Pre-Bid Conference and Job Walk—Conduct pre-bid conferences and job walks with prospective Bidders to familiarize them with the RFP Documents, prepare a record of the questions and answers discussed at the pre-bid conference and job walk, and address these questions by preparing addenda.

Bids Submittal and Review—CSG can assist the City with the evaluation of bids for completeness and accuracy through verification for compliance with the RFP Documents. If there is a cost component, CSG can compare listed bid prices to the City reconciled cost estimate and cost database to determine if all project work components have been included in the design-build contractor’s bid and if required, make a recommendation to the City for contract award.

Pre-Award Conferences—If required, our staff will conduct pre-award conferences with the successful design-build contractor.

TASK 5 – Review Design-Build Plans, Specifications, and Estimates Constructability Review— The CSG constructability review process will analyze the plans, specifications and estimates submitted by the selected design-build team for buildability by reviewing and making recommendations to the City with respect to clarity, consistency, constructability, construction cost, sequence of construction, and construction duration. The review will be performed at each submittal phase listed in the RFP and will include an on-going effort by CSG until an approved final set of Construction Set Documents has been issued, i.e., once the project is ready for construction. Some standard elements for review as part of constructability review include site logistics, constraints; conformance among plan/spec design disciplines; conformance with applicable codes and standards; scheduling requirements and restrictions; site safety and access; long lead items and current market conditions/construction costs.

Constructability reviews establish project duration, milestone dates, complexity of design, necessities for construction, expected means and methods, and gives a genuine and realistic idea of what it will take to complete the project from a design-builder perspective and will be the first in what will be multiple items of QA/QC work by CSG on behalf of the City.

Value Engineering— CSG considers the design development period as the most important time with respect to Value Engineering. During this critical stage CSG will review and comment on areas believed to be either over-designed or economically lacking. With the help of the design team, CSG will facilitate revisions to

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
15 ensure efficient and economic design criteria are met. The key to Value Engineering is to maintain the project’s design integrity while altering means and methods being provided by the future Contractor as part of their bid. Typical areas for identifying potential Over-Design scope, pinpointing when direct Owner procurement of items is beneficial, evaluating specified building control/management system functions and operation, material types and quantities, procuring materials locally, Pre-selecting specific means/methods for construction.

Cost Estimating and Scheduling— CSG will review the cost estimates provided with each design submittal to ensure compliance with the City’s project budget, and when there is a difference in costs work with the City to identify reasons for such difference and recommend means to eliminate the difference.

Project Budget—We will evaluate the current City estimate to determine if the current estimate is in alignment with the City Budget for the project and represent the current costs within the industry and work with the City to estimate costs and validate the project budget including contingencies for the project.

Project Schedule—CSG will develop a baseline project schedule that integrates the design team activities with the anticipated construction schedule for the contractor and include the milestones and key activities for the project. Overall progress of work will be measured monthly against this baseline schedule and adjustments made when required. The design-build teams work will be regularly reviewed and monitored for progress against the scheduled milestones, and CSG will advise the City on necessary actions to prevent, minimize or recover from delays. The Schedule will be maintained using the latest available version of the Microsoft Project scheduling software program.

Meetings— CSG will attend all project meetings with City and the Design-Build Team, and all programming and site planning meetings relating to the Project.

TASK 6 – Construction Support
Our approach to construction management is through coordination, communication, reporting, efficiency, and the right expertise to match the project’s specific needs. During this phase, CSG will administer the construction contracts and facilitate communication between the contractors, the Architect, and the City to complete the Project in accordance with the contract documents. We will closely monitor the construction progress and recommend courses of action to the City for any delay or contractor failure to fulfill contractual requirements. We will coordinate the preparation of construction staging areas on-site for the Project and coordinate the preparation of the site for construction, the mobilization of all contractors and construction sequencing.

Some standard items of work that CSG will perform during this phase include:

Temporary Facilities for City Staff— If required, we will work with the City during the preconstruction pkhase to identify and determine a feasible location, research, and select the type of temporary structure, assist with the connection of utilities, and coordination the moving and storage associated with the temporary relocation.

Contract Notice to Proceed– CSG shall administer and review the Contract Agreement with the selected Contractor. Once all items have been reviewed, scope of work verified, and standard logistics addressed, CSG will recommend the City execute the agreement and issue a Notice to Proceed to the Contractor.

Pre-Construction Conference—CSG shall facilitate and conduct a Pre-Construction Conference with the Awarded Design-Build Contractor. CSG will then coordinate the Contractor mobilization period and submission of schedule of values with various items of work.

Project Office—Set up a construction project office, as needed, for use by the City and CSG staff and coordinate with the City for connections for computer equipment.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
16 Permits—Assist the City and the Contractor in obtaining all necessary permits for the Project.

Meetings—CSG will schedule, conduct, and participate in weekly job site progress meetings, plus quality control and special meetings with the City, Contractor, and any other stakeholders involved in the Project to discuss such matters as procedures, progress, quality, and scheduling. CSG will prepare and distribute meeting minutes.

Construction Schedule Monitoring— Our team will conduct weekly project meetings to review the project status, update the project schedule, discuss any outstanding items, resolve disagreements and work collaboratively towards the successful completion of each phase of the project. The contractor construction schedule will be used during these meetings as a tool to track the progress of construction relative to the approved baseline. All changes that impact on the baseline schedule will be closely monitored and discussed at the weekly meetings.

Change Management—CSG's goal on every project is to resolve changes to the contract expeditiously to mitigate potential claims or disputes. CSG will maintain a submittal log that tracks the processing of change order requests CORs and approval of change orders (COs). (CSG can provide the following but related costs for CSG are not included in this proposal) CSG can provide Change Order and Claim Management is as follows:
▪ Review all documents and coordinate with Design-Build Contractor to substantiate validity of the Change Request
▪ If valid, determine Impacts to Schedule
▪ Develop City estimate for CORs.
▪ Negotiate final costs on behalf of the City.
▪ Provide recommendations to the City for approval or rejection. ▪ can provide estimates for change order requests (CORs) and assist with any analysis of any contractor Time Impact Analyses (TIA).

Project Costs—CSG will track all project costs for work performed by the Contractors to ensure compliance with the Project budget and manage project contingencies and allowances.

Safety—CSG will ensure that its personnel are trained on jobsite safety, and shall review the construction contractor(s)’ Safety Program submittals and review and document the implementation of the construction contractor(s)’ Safety Program and applicable Cal OSHA requirements by ensuring that the contractor(s) submit a job-specific safety plan for the project, discuss safety at each construction meeting, require a pretask analysis and planning for critical events (such as crane picks), require weekly toolbox safety specific meetings for all field personnel, conduct frequent safety inspections by both project and home office personnel, and live by a zero tolerance policy for unsafe acts or practices on our job sites. CSG will also coordinate safe access to the site for inspections and site visits by the City staff and consultants.

Punch List— All project team members will be required to complete a punch list that will be consolidated into one comprehensive list that will be given to the contractor for completion. CSG will work with the Architect and Contractor to ensure proper completion of all items as listed on the “Punch List” prior to recommending the City release the Contractor’s Notice of Completion.

TASK 7 – Project Close-Out
During this phase, CSG will coordinate and schedule for the City occupying the new facility and the closeout of open items on the project. After construction is completed, CSG will manage the close-out, building commissioning and move-in activities and facilitate all required training, acquisition of operations and maintenance manuals, operating procedures, and record documents. Some items of work will include:

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
17 Furniture, fixtures, and Equipment (FF&E) Install – Upon completion of construction by the Contractor, CSG can oversee and manage the installation of furniture, fixtures, and equipment.

Move Management—CSG can coordinate City user relocations and occupancy into the new facility.

Training Sessions—We will coordinate with and schedule the required attendees for each training session or commission and manage the training and commissioning sessions.

Closeout Submittals—CSG will manage the closeout submittal process on the City's behalf. Standard closeout submittals include Operations & Maintenance Manuals, Tests and Balancing Reports, Final As Built and Record Drawings, Warranties, Releases, Bonds and Waivers, Keying/Keys, Commissioning Reports.

Final Completion—The final stages of Construction Management services by CSG shall occur once all work is complete, Staff has occupied the facility, pending claims have been released and closeout documents have been sufficiently reviewed and accepted. At that time CSG will coordinate with the City for Final Acceptance; Final Payment(s), Notice of Completion, Release of Contractor Retention, and Certificate of Occupancy.

Furthermore, CSG shall be available in response to initial post-occupancy complaints about missing or malfunctioning building components and equipment, and contractor/vendor warranty items.

Warranty Inspections- Finally, CSG can coordinate and conduct a year-end walk through immediately prior to the expiration of the warranty period, coordinate the repair of any defects and deficiencies and completion of the project.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
18 Appendix
Resumes for key team members are hereby included:

1. Peykan Abbassi, P.E. – Point of Contact (Principal Engineer)

2. Cyril Charles, P.E. – Mechanical Engineer

3. Paul Young – Architect
SECT ION 7
19 Peykan

LICENSES &

CERTIFICATIONS
Professional Civil Engineer
State of California |51996
Board of Professional Engineers and
Land Surveyors
LEED AP Certificate, United States
Green Building Council
Project Management Certificate,
Bureau of Engineering, City of Los
Angeles
Certificate in Effective Negotiation,
Karrass Institute

EDUCATION
MS Civil Engineering,
University of Southern California
BS Civil Engineering,
University of Southern California
Abbassi PE, LEED AP
Principal En gineer (Poin t of Contact)
Mr. Abbassi is an experienced civil engineer for large programs in Public Works, Transportation, Development and Municipal Engineering with 35 years of experience.

Through the creation of a team environment and project ownership atmosphere he achieved outcomes above and beyond the expected performance levels. He consistently developed cohesive management teams and has experience working with various funding sources and regulatory agencies.

R E L E V A N T E X P E R I E N C E
Project Manager & Construction Manager | Navigation Center Project, City of Vallejo, CA Mr. Abbassi provides project management services for the Navigation Center in Vallejo with approximate budget of $8 million. The project included: all real estate transaction agreements; on and off-site improvements; a Sprung Structure dormitory that sleeps 125 individuals; a Sprung structure services building that provides operation, dental and medical services; and a Linked Building restroom that include showers. Mr. Abbassi works with the design team, contractor, operators, and City staff to ensure the project is completed on time and within budget. His duties include cost estimating; negotiation of subconsultants’ fees; coordinating real estate agreements with Vallejo Flood and Wastewater District and Kiewit; managing the design and construction of the project; lead weekly meetings with the design team, contractor and City staff; and communicating with operators and services providers of the site.

Building Project Management/Construction Management
In the following projects, as the PM/CM I managed planning department requirements, entitlements, public improvement design and construction (B-permit work) in addition to the building permitting process through various regulatory agencies inside and outside the City.

Collaboration and communication with the stakeholders on a regular basis were the reasons for on time and on budget delivery of the projects. In addition, I negotiated the A&E contracts, managed the A & E consultants, and the PM/CM firm augmented the City’s staff. • Police Administration Building Program (Total program budget $430 M Hard and Soft cost, 3-Buildings plus a data center)
Deputy Program Manager
A. Police Administration Building (PAB): $240 M construction budget, value engineered $16 M, 500,000 SF, 10-story with 396 2-level subterranean parking.

B. Motor Transport Division/Main Street Parking (MTD/MSP): $72 M construction budget; 396,000 SF 800 parking in 5-level plus roof, 20,000 SF service shop with 10 service bays, 4 fueling stations, and two level 6000 SF office space.

C. Aiso Street Parking (ASP): $22 M construction budget, 120,000 SF, 300- parking spaces, 2-level subterranean parking with 45,000 SF street level Plaza for Little Tokyo Community events.
• Griffith Observatory Renovation and Expansion: $83 M construction budget, Project Engineer/Construction Manager.
• Pacoima-Gonzales Boxing Facility: $1.5 M construction budget Project Manager/Construction Manager
• Echo Park Childcare Center: $4 M construction budget
Project Manager/Construction Manager
20 Construction Manager/Project Engineer | City of Los Angeles, Construction Management Division Mr. Abbassi performed Construction Management for the $75 million Griffith Observatory Renovation and Expansion Project. He conducted comprehensive coordination between the design and construction activities. Mr.

Abbassi managed A/E consultants and the planning and permit process. Other municipal facilities he managed included Echo Park Childcare Facility and Pacoima Boxing and exercise facility.

Deputy Program Manager | City of Los Angeles, Police Administration Building Program Under a program budget of $430 million, Mr. Abbassi assisted the program manager with budget analysis and continuous monitoring of construction expenditures and consultant contracts. He served as the Project Manager leading the overall planning and management for Metro Transit Division/Main Street parking an 800 stalls parking in a five level, six story structure with a 20,000-sq. ft., 10 bay, 4 fueling stations with a construction budget more than $72 million. He also managed the Aiso Parking Structure, a 300 stalls subterranean structure with a plaza at street level. He managed consultant architects, mechanical, electrical, plumbing, structural, civil, landscaping, security and art consultants.

City Engineer | City of Half Moon Bay, CA
Mr. Abbassi was responsible for complex and technical tasks related to capital infrastructure, utilities, traffic studies and management, land development and other public works-related projects and programs ensuring compliance with all codes and regulations. His work included managing consultants for storm drain and sewer master plans as well as design consultants for the CIP.

Heavy Civil Program Management/Project Management/Construction Management • Chief Development Officer: Lead the Engineering, CIP program, Signal and Systems including Positive Train Control (PTC) projects. Managed the oversight and implementation of over $1 Billion LOSSAN projects, $10 Million North County Transit District (NCTD) CIP Program including two bridge repair (Bridge 243, and 217), Solano Beach station slope stabilization, Del Mar Bluff failure study, design recommendations and implementation, Inland corridor eroded slope repair, and $87 Million NCTD’s PTC projects. • Project Manager: The lead engineer to coordinate and perform oversight of public works improvement for two LAMTA (Los Angeles Metropolitan Transportation Authority) projects (EXPO II, and Regional Connector) for the City of Los Angeles Department of Public Works
• Construction Manager: Installed 5 Storm Drain Filtering systems on major storm drain lines throughout the City of Los Angeles. Average construction costs $1.2 M/unit. • Change Order Engineer: 250 Projects exceeding $63 M (cumulative) construction cost, and a copy of the list of the projects (11 pages) from the logbook is available upon request. I negotiated all the change orders for the 250 projects from 1993 to 2000 (7 years). Among the list are 50 Emergency Sewer and Emergency Storm Drain projects which I was responsible to award, and analyze, negotiate, and approve the cost. Five of these were FEMA funded projects due to the emergency nature and the declaration for emergency in Los Angeles County in 04/05 rainy season. I received commendation and was acknowledged by the Board of Public Works for efficient and timely management of the emergency projects in addition to productive collaboration with the City forces and the contractors. 21 Cyril

LICENSES &

CERTIFICATIONS
Professional Mechanical Engineer
State of California
| M28217
LEED AP Certificate, United States
Green Building Council

EDUCATION
MS Mechanical Engineering,
California State University,
Los Angeles
BS Mechanical Engineering,
University of the West Indies,
Trinidad
Charles ME, LEED AP
Sen ior Project Man ager
Mr. Charles is a previous City of Los Angeles, Department of Public Works senior engineer and project manager. He is a licensed professional engineer with 25+ years of project and construction management experience in all phases of projects who has successfully managed and completed several large municipal facility projects through coordination, developing partnerships, and building positive relationships with architects, engineers, contractors, code enforcement officials, and vendors. Mr. Charles has prepared and issued RFPs, managed contracts for project consultants and contractors including selection and has been responsible for project scope, schedule, cost, and stakeholder management. He has also designed mechanical and plumbing systems for projects and has knowledge of codes and Title 24 compliance. He has been the Owner representative for commissioning and delivery of several LEED projects throughout the City of Los Angeles.

R E L E V A N T E X P E R I E N C E
Project and Construction Management
o Los Angeles Convention Center Renovation and Expansion Project – Project manager to develop Schematic Design (SD+) documents for this estimated $900M+ PublicPrivate-Partnership (P3) project. o Silverlake Reservoir Master Plan Project –Project manager for development of a master plan for this urban reservoir site to include request for proposals (RFP) preparation and issuance, consultant selection and management, and stakeholder management. o LAPD Metro Detention Center – Project Manager for the construction of 512 beds, $85M, 160,000 sq. ft. detention center.
o LAPD Metropolitan Division Facility– Project Manager for the design and construction of this $20M. renovation to the old 62,000 sq. ft. Rampart Police Station. This is a LEED Platinum project.
o Rampart Area Police Station – Project and construction manager for this 52,000 sq. ft. police facility with a 280-vehicle parking garage, vehicle repair facility, car wash and fuel dispensing station.
o West Valley Area Police Station – Construction manager for this 46,000 sq. ft. police facility with a 330-vehicle parking garage, 6,700 sq. ft. vehicle repair facility, car wash and fuel dispensing station.
o City Hall East Data Center Server Upgrade Project – Managed the construction of an expansion upgrade to this data center for the City Hall complex. This project included the installation of an adiabatic chiller as the main source of cooling for the facility. o Los Angeles Convention Center Solar Photovoltaic Project – Project manager for the installation of 2.2 MW of solar panels to the roof of the South Hall building. o North Central Animal Shelter Renovation and Expansion - Project and construction manager for the $23M expansion and renovation of this animal shelter facility.

Plumbing and HVAC Design Projects
o East Valley Solid Resources Management Complex – Designer for HVAC and plumbing systems for a new $30M Bureau of Sanitation facility complex with an administration building, truck maintenance facility, hazardous waste disposal building, and container storage building.
o Pacoima Branch Library – Designer for HVAC and plumbing systems for a new 10,500 sq. ft. library facility.
22 Paul

LICENSES & CERTIFICATIONS
Licensed Architect
State of California | C-19758
Project Management Certificate
City of Los Angeles
Certification - Building Plans Examiner,
International Code Council (ICC)

EDUCATION
BS Architecture,
Howard University, Washington D.C.

Graduate Study in Architecture,
University of Washington
Seattle, Washington
Young
Project M anager - Arch itect
Paul Young is a California Architect with experience with various types of municipal buildings. He has experience in project management, programming, architectural design, and design review. He has coordinated the activities of design consultants among the design disciplines and with the project recipient. He has prepared various status reports for government entities and completed board reports for governing agencies. Has managed contracts, reviewed schedules, invoices, and contract changes. He has worked on the traditional design/bid/build and design/build delivery projects.

R E L E V A N T P R O J E C T E X P E R I E N C E
Project Manager | Los Angeles Street Civic Building
Project Manager for the development of programming and technical requirements for a 20- story, 970,000 square foot office building with 1,173 parking spaces) as a Public/Private Partnership project. Also managed the EIR process for the demolition of Parker Center, the old Los Angeles Police Department LAPD Headquarters building, and the construction of this 20- story office building project. Parker Center was constructed in 1954 was considered an historic building.

Project Manager | Boyle Heights Neighborhood City Hall
Project Management, programming, pre-design, design & construction management for the “Chicago Building”, a 25,000 sq. ft. unreinforced masonry building that was used to accommodate City departments in service to the Boyle Heights neighborhood. The building was purchased and upgraded for seismic safety and to serve as the Boyle Heights Neighborhood City Hall, a constituent service building for the community.

Project Manager | Demolition of Parker Center
The demolition of an eight-story building of approximately 360,000 square feet with two basements that once served as the headquarters for the Los Angeles Police Department. This project also required significant hazardous material abatement prior to the start of demolition.

Project Manager | Asphalt Plant No. 1
A design-build for a $15M project involving the selective demolition of an old administration building and the old asbestos plant and the construction of a new asphalt plant with the ability to utilize recycled asbestos. In addition, the project included an administration building that provided office space and facilities for on-site employees at the Plant.

Project Manager | South District Sewer Sanitation Maintenance Yard (SDMY) SDMY involved the replacement of facilities used for the upkeep of the sewers in the southern region of Los Angeles. The size of the vacuum trucks used for cleaning clogged sewers grew beyond the capacity of the yard of one acre. The existing facility consisted of an administration building and several masonry garage buildings. The buildings were demolished and replaced with a new administration building with office space facilities for the employees that drove the trucks and performed the maintenance activities.

Project Manager | Felipe de Neve Branch Library
Seismic reinforcement and expansion of an unreinforced masonry building built in the 20’s with funds provided by the Carnegie Foundation. One of many Carnegie libraries from this era to be seismically upgraded by the City.

Project Manager | Van Ness Park Gymnasium
Construction of a new gymnasium that accommodates a high school sized basketball court in an existing park in central Los Angeles. The design was from a template derived from the Pecan Park Gymnasium.

WWW.CSGENGR.COM
888.794.2016

CENTRAL COAST
• Paso Robles •

SOUTHERN CALIFORNIA
• Orange •

OFFICES

THROUGHOUT

CALIFORNIA

SAN FRANCISCO BAY AREA
• Foster City • San Jose • Pleasanton •

SACRAMENTO REGION
• Sacramento •

CENTRAL VALLEY
• Newman • Fresno •
3707 W. Garden Grove Blvd Ste #100
Orange, CA 92868
714.568.1010 phone
714.568.10288 fax
www.csgengr.com

PROPOSAL TO THE
City of Compton
Aquatic Facility Construction Consultant Services
M a r c h 7 , 2 0 2 4

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
Table of Contents
SECT ION 1 Firm Profile 3
SECT ION 2 Firm Experience 6
SECT ION 3 Staff Communication 9
SECT ION 4 Key Personnel 11
SECT ION 5 Cost 12
SECT ION 6 Additional Information 13
SECT ION 7 Appendix: Resumes of Key Personnel 18

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
3707 W. Garden Grove Boulevard, Ste. 100, Orange, CA 92868 phone 714.568.1010 | fax 714.568.1028 | www.csgengr.com Cover Letter
March 7, 2024
Bryan Spragg,
Director of Recreation
City of Compton
205 South Willowbrook Avenue, Compton, CA 90220
RE: Request for Qualifications (RFQ) to Provide Aquatic Facility Construction Consultant Services
CSG Consultants, Inc. (CSG) is writing to express our interest in providing consultant project and construction management services as outlined in the Request for Qualifications (RFQ) for Aquatic Facility Construction Consultant Services, dated February 14, 2024. With our extensive experience in project and construction management and a track record of successful project delivery for municipalities throughout California. We are confident in our ability to contribute to the success of your project.

For this project, I will serve as the authorized representative (primary contact) for this contract. My role will be to oversee and support the team throughout the contract. My contact information is:

Peykan Abbassi, PE | Vice President
phone (714) 568-1010 | [email protected]
cell (818) 800-6326
Over the past 33 years, CSG has managed a diverse range of construction and infrastructure projects and possesses a deep understanding of project delivery, from initial scoping and feasibility studies to design, construction, and closeout. Our ability to develop comprehensive project plans, manage budgets and schedules, mitigate risks, and coordinate multidisciplinary teams has consistently resulted in the timely and cost-effective completion of projects.

Key qualifications and attributes that CSG would bring to the City of Compton include:
• Construction Administration and Monitoring: a proven ability to lead projects from initiation to completion, ensuring adherence to scope, schedule, and budget. • Quality Assurance: Prioritizing quality control and assurance throughout the project lifecycle. • Team Leadership: A collaborative leadership style that motivates project teams to perform at their best.

Based on our understanding of your objectives for consultant services to update the Lueders Park swimming pool and Gonzalez Aquatic Center, we are confident that our skills and experience align perfectly with your requirements. We are eager to contribute to your project's success and drive tangible results for the City. Please find attached our detailed Proposal, references, and comprehensive portfolio of past projects for your review.

Several staff members have extensive experience working with the City of Los Angeles as Project and Construction Managers prior to their employment with CSG to include Design-Build projects delivery.

Thank you for considering our application. I look forward to the possibility of working with you and your team.

Should you require any further information or wish to arrange an interview, please do not hesitate to contact me.

Sincerely,
Peykan Abbassi, PE
Vice President, CSG Consultants, Inc.

CSG AT A GLANCE
▪ Multidisciplinary
building, engineering,
planning,
environmental
construction
management, and plan
check services
▪ Founded in 1991
▪ 9 offices
▪ 350+ employees
▪ 100% employee-owned

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
4 Firm Profile
CSG Consultants, Inc. (CSG) is a California company with its corporate office in Foster City. Founded in 1991, CSG has built its reputation around providing both as-needed and project-specific professional engineering services exclusively to public agencies. Many of the individuals at CSG have previously worked for a public agency at some point in their career and as such are keenly aware of the standards, regulatory processes, constraints, and political undertones by which a project is completed.

F I R M S U M M A R Y
LEGAL NAME OF FIRM: CSG Consultants, Inc.

POINT OF CONTACT: Peykan Abbassi, PE | Vice President
LOCAL OFFICE: 3707 W. Garden Grove Boulevard, Suite #100, Orange, CA 92868 (714) 568-1010 phone | (714) 568-1028 fax
HEADQUARTERS 550 Pilgrim Drive, Foster City, CA 94404
www.csgengr.com • [email protected]
YEARS IN BUSINESS: 33 • Founded in 1991
EMPLOYEES: 350+
TYPE OF ORGANIZATION: California Corporation • Incorporated June 15, 2000 Federal ID: 91-2053749

S T A F F C O M P O S I T I O N
Our professional municipal services staff consists of:
 Construction Managers  Civil Engineers
 Construction Inspectors  Transportation Engineers
 Resident Engineers  CASp Professionals
 Program & Project Managers  Structural Engineers
 Land Development Review Engineers  Building Officials  C.3 Review Engineering & Specialized Inspectors  Building Plan Reviewers  Planning Professionals  Fire Plan Reviewers & Inspectors

F I N A N C I A L S T R E N G T H
CSG was formed in the early 1990s and is an employee-owned, multidisciplinary engineering firm. We have a very stable economic base and workforce within our two primary and complementary service lines, building/fire department services and engineering. CSG has grown steadily in both revenue and staff size, and now has over 350 employees serving customers throughout California and Nevada. We are debt-free and have a commercial bank line of credit that is available to use. In addition, we have no contract defaults, bankruptcies, or mergers and no impending mergers. The company is well positioned to service the City. Upon selection for this contract, CSG can provide further details regarding its financial strength, including reviewed financial statements.

SECT ION 1

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
5 S T A F F W O R K L O A D
The current workload of the staff selected for this project is as follows:

Name / Role Company Certifications Years of
Experience
Anticipated Percentage
of Time on Project
Peykan Abbassi
Point of Contact CSG PE 35 10%
Cyril Charles
Sr. Project Manager CSG PE 30 25%
Paul Young
Construction Manager CSG Licensed Architect 30 65%

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
6 Firm Experience
The CSG employees that will be assigned to this project have experience with using the design-build method as a project delivery tool during their time working for the City of Los Angeles, Bureau of Engineering. In addition, they have extensive experience working with public projects including new and existing renovations for departmental office buildings, police, fire, recreation and parks facilities, and animal shelter facilities for the City of Los Angeles and other cities throughout California.

CSG staff has provided project and construction management services to jurisdictions for capital improvement projects throughout California. Project types include public facilities such as recreation and park facilities, fire stations, and navigation centers (homeless facilities). The following are examples of projects for which CSG have performed similar services. Additional projects and references may be provided upon request. For the resumes of the various team members see Section 6 (Appendix).

SHERWOOD RECREATION CENTER | CITY OF SALINAS, CALIFORNIA Client: City of Salinas
Reference: Luis Ochoa, Sr Community Development Analyst, [email protected] Team Members: Cyril Charles, PE; Gelareh Jokar
Period of Performance: 2023 - Present
CSG offers project management services for the renovation of an approximately 12,895 square feet Sherwood Recreation Center, situated in the City of Salinas, California. This site includes a recreation center and aquatic center on the Salinas Rodeo Grounds. The project primarily targets exterior
enhancements, encompassing ADA accessibility, roofing,
window upgrades, painting, landscaping, parking optimization, integration of ADA-compliant parking and pathways, and
various other construction endeavors. CSG's responsibility entails collaborating with and advising City personnel, overseeing the design team and sub-consultants, and ensuring compliance with all municipal requirements. Tasks also encompass cost estimation, fee negotiation with sub-consultants, request for sub-consultant's proposals, design management, chairing progress meetings, NEPA & CEQA documentation, bid solicitation, and subsequent review.

COMMUNITY SWIM CENTER AND 10 MUNICIPAL BUILDINGS| CITY OF HERCULES, CALIFORNIA Client: City of Hercules
Reference: Jeff Brown, Director of Facilities
Team Members: Peykan Abbassi, PE; Cyril Charles, PE
and Paul Young, Architect
Period of Performance: 2023-2024
CSG provided project management services for a facility condition assessment study and 10-year capital improvement report for 11 buildings owned and operated by the City of Hercules including the Community Swim Center with two pools. This work included site inspections of the site and conditions of all major building components and systems for each facility, review of pertinent documents such as as-built drawings, building records, construction documents, building codes and violations, and maintenance records, and data analysis and calculation based on our engineering expertise and experience, our field observations, and accepted reference guides such as BOMA and RS Means.

SECT ION 2

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
7 CHINATOWN NAVIGATION CENTER | CITY OF SALINAS, CALIFORNIA Client: City of Salinas
Reference: Luis Ochoa, Sr Community Development Analyst, [email protected] Team Members: Cyril Charles, PE; Gelareh Jokar
Period of Performance: 2023 - Present
CSG provides project management services for the renovation of the Chinatown Navigation Center (CNC) situated in Salinas. The CNC serves as a hub for homeless services, catering to around 50 men and women, while also offering shower and restroom facilities for individuals living on the streets within the Chinatown neighborhood. The project scope includes enhancing an existing ADA shower, three standard showers, men’s and women’s restrooms, exterior building signage, and refinishing of existing concrete flooring. CSG's role involves collaborating with and advising City personnel, overseeing the design team and sub-consultants, and ensuring adherence to all municipal requirements. Responsibilities further encompass cost estimation, negotiating fees with sub-consultants, managing the design process, leading progress meetings, handling CEQA documentation, soliciting bids, and conducting subsequent reviews.

TOWN HALL EXPANSION AND RENOVATION PROJECT | TOWN OF COLMA, CALIFORNIA Client: Town of Colma
Reference: Daniel Barros, City Manager, (650) 997-8318, [email protected] Project Cost/Contract Amount: $18 M/ $850,000
Period of Performance: 2016-2019
CSG provided the Town of Colma with project management and construction management services for the Town Hall Campus Renovation and Expansion project. CSG was actively involved in the project from the planning phase to construction completion.

The work encompassed management of remodeling the existing 1941 building and creating an addition. The addition facilitated 7,000 square feet of new administrative office space and 3,300 square feet of conditioned basement space, which contains record storage, offices, electrical, mechanical and IT rooms. In addition to construction management and inspection, CSG staff assisted with the constructability review, value engineering, RFI’s and submittals, and scheduling and estimating.

NAVIGATION HOMELESS CENTER | CITY OF VALLEJO, CALIFORNIA Client: City of Vallejo
Reference: Melissa Tigbao, Public Works Director (707) 648-4316, [email protected] Team Members: Peykan Abassi, PE; and Cyril Charles, PE
Period of Performance: 2021–Present
CSG provides project and construction management services for the design and construction of a Navigation Center in the City of Vallejo with an approximate budget of $8 million. The project includes real estate transaction agreements; on and off-site improvements; a Sprung Structure dormitory that sleeps 125 individuals; a Sprung structure community services building that provides operation, dental and medical services; and separate shower and restroom facility structures. CSG role is to work with and advise the City staff, and to manage the design team,

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
8 contractor, operators to ensure that the project is completed on time and within budget. The duties also include cost estimating; negotiation of subconsultants’ fees; managing the design and construction of the project; leading weekly meetings with the design team, the contractor and City staff; and communicating with operators and services providers of the site.

SOUTH BAY REGIONAL PUBLIC COMMINICATIONS AUTHORITY| CITY OF HAWTHORNE, CALIFORNIA Client: City of Hawthorne
Reference: Executive Director, [email protected]
Team Members: Peykan Abassi, PE; Cyril Charles, PE and Paul Young, Architect
Period of Performance: 2023
CSG provided facility condition assessment services for the City of Hawthorne “South Bay Regional Public Communications Authority” that houses essential dispatch services for various cities throughout the South Bay region. This work included site inspection(s) to observe the general site improvements and conditions of all major building systems, review of pertinent documents such as drawings, as built, building records, construction documents, building codes and violations, and maintenance records, and data analysis and calculation based on our engineering expertise and experience, our field observations, and accepted cost guides such as BOMA and RS Means.

PUBLIC FACILITY PROJECTS | CITY OF VENTURA, CALIFORNIA
Client: City of Ventura
Reference: Barbara McCormack, Director of Facilities (815) 652-4545, [email protected] Project Cost/Contract Amount: Ongoing/On-Call
Team Members: Peykan Abassi, PE; and, Cyril Charles
Period of Performance: 2022-2024
CSG is currently conducting project and construction management services for renovation work on the Ventura Police Department, six (6) fire stations, and the Battalion Chief house which serves as the central operations facility for the Fire Department. For the police department, we are tasked with project management activities related to repair and replacement of the existing air handler unit system and mold remediation within the exiting ductwork that require temporary HVAC systems to be installed. This project requires close coordination among stakeholders due to 24/7/365 operation of the facility. CSG is also tasked with managing the design and construction for the complete replacement of the existing HVAC systems for the six (6) fire stations, and the Battalion Chief house. The CSG project team is also tasked with performing a constructability review of the documents to ensure efficient construction with minimum risk of claims and change orders.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
9 Staff Communication
CSG uses a variety of communication modalities to communicate with its clientele and team members as follows:

Email—CSG uses email often to communicate with team members and its clientele.

Project Management Information System (PMIS) — CSG will use a PMIS to facilitate project planning execution, monitoring, and control. This computer-based program serves as a digital command center for project management in maintaining contact and a communication line to the City, team members and stakeholders.

Meetings—CSG will schedule, conduct, and participate in weekly job site progress meeting, plus quality control and special meetings with the City, Consultants, Contractors, and any other stakeholders involved in the Project to discuss such matters as procedures, progress, quality, and scheduling. CSG will prepare and distribute meeting minutes. These meetings may be on-site or virtual via providers such as Teams and Zoom.

Direct Calls—CSG will use a direct call at those times that it is the most appropriate communication based the situation. When a quick answer or message is required because of the urgency of a situation a phone call will be made.

Reports—CSG will create and distribute reports and minutes based on the needs of the project. Typically, there are a variety of reports generated during the progress of a project depending on the audience and the needs of the project. Project status reports are generated to keep stakeholders informed with updates of the costs, risks, schedule, and upcoming milestones within a specific period that are compared against the project plan. CSG will create and distribute reports as required by the City and the needs of the project. CSG can also assist the City with Board or Council Reports if required.

Meeting Minutes will feature the following:
▪ Date, Time and Location of Meeting
▪ Names of the Participants
▪ Agenda Items and Topics Discussed
▪ Action Items
Project Status Reports will have the following features:
▪ Brief Introduction of Topics In the Report
▪ Summary of Completed Work, and Work To Follow.
▪ Project Schedule Update
▪ Budget Status Update
▪ Upcoming Tasks and Milestones
▪ Action Items
▪ Project Risks, Issues, and Mitigation Plans
Construction Weekly Meeting Minutes will have the following features:
▪ Attendees List
▪ Review of Previous Meeting Minutes and Status Update or Response to any Pending Issues ▪ Discussion of Issues, Material Delivery Or Shortages, Site Problems, Shop Drawing Submission and Approvals, Construction Conflicts Etc.
▪ Review of Progress Schedule including Identifying Causes of any Delay ▪ Discussion of New Business including Status of Change Orders In Progress ▪ Contractor Payment Issues Can Be Discussed In General, Especially To Verify the Monthly Cycle of Pencil Copies and Payment Approvals.

SECT ION 3

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
10 ▪ Discussion of Coordination of Owner Supplied Equipment Or Staff Moves As It Relates To Renovation and Occupancy.
▪ Comments and Questions Period.
▪ Time and Place of the Next Meeting.

Board/ City Council Reports will have the following features:
▪ To – (City Board or City Council with Decision and Funding Authority) ▪ From – (City Project Team)
▪ Date – Date of the Meeting
▪ Subject – Project Name, with the Unique Need(s) of the Project Expressed ▪ Recommendations – The items the City Project Team wants the Board or City Council to Approve ▪ Background -
▪ Summary – Synopsis of the actions previously taken with the project. ▪ Funding and Potential Funding

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
11 Key Personnel
Resumes for the following key team members are provided in Section 6:

1. Peykan Abbassi, P.E. – Point of Contact (Principal Engineer)

2. Cyril Charles, P.E. – Sr. Project Manger

3. Paul Young – Construction Manager
SECT ION 4

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
12 Cost
Based on our understanding of the RFP, CSG will assign a Project Construction Manager to provide project management services for 16 hours per week for the total fee of $183,040. For (12) invoices, the monthly fee is $15,253.

This fee proposal is based on the following assumptions:

1. CSG has based the above fee proposal on a project duration for project and construction management services of twelve (12) months.

2. CSG has based the above fee proposal on a project budget for the undefined scope of work of $1,000,000.

3. This fee schedule doesn’t include the provision of an inspector during the construction phase.

Additional time required beyond the hours listed above work will be based on the below schedule of rates.

CSG ENGINEERING RATE SCHEDULE
Professional Engineering Services 2023
Hourly Rate
Principal Engineer $250
Senior Project Manager $235
Construction Manager $185
Asst. Project Manager $155
Document Control $125
All hourly rates include overhead costs including, but not limited to, salaries, benefits, Workers Compensation Insurance, travel, and office expenses. Overtime work will be billed at 1.5x the hourly rates indicated in the table above. On July 1 of each year following the contract start year, CSG will initiate a rate increase based on change in CPI. CSG will mail/email an invoice every month for services rendered during the previous month.

SECT ION 5

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
13 Additional Information
CSG has thoroughly reviewed the City’s Request for Proposals for an Aquatic Facility Construction Consultant to manage the design-build process for the improvements required for swimming pools located at Lauders Park and the Gonzalez Aquatics Center. We fully understand and honor the importance of this project to the Compton community and are committed to providing all necessary project management, construction management and technical expertise to deliver the services that the City requires to ensure the successful delivery of the Project in meeting the City’s scope, budget, and schedule objectives.

P R O J E C T A P P R O A C H
Our approach to this project will include the engagement of City staff and effective teamwork with the selected design-build team and collaboration among other key project stakeholders. We offer a unique experience managing projects that include project team and consultant coordination; project information updates; utility impacts and relocation; design and procurement of temporary recreation facilities; documents review; and full- service staff support during construction.

CSG understands the importance of public information and community outreach in this type of project. As required, we will actively support the City staff and design-build team’s efforts and augment their information flow with tailored and frequent updates to City staff, the City Council, and City boards and commissions as needed. As the design-build team engages the community through design decisions, we will provide regular updates to the City that is vital to the project schedule and the integrity of the City’s decisions.

CSG’s document control is a vital component of Project Management for the project. The assigned project manager will immediately implement an action item tracking system and establish weekly coordination meetings with the City’s project manager.

CSG will thoroughly vet ideas and solutions as the work is occurring to ensure that the project team is not getting out ahead of decision-makers and key stakeholders, and to ensure that participants – at any level of engagement – feel that the process is transparent and that their input will be heard and valued. This is a fundamental CSG approach to project management and will be our commitment to the City.

With this approach CSG has successfully delivered projects of a similar nature. CSG has assembled a team with local expertise and extensive experience in the development and implementation of large public facilities projects. We operate from an office within proximity to City Hall and the project site.

TASK 1 – Project Management, Meetings and Coordination
To begin this task CSG will host an introductory kick-off meeting with City staff and key stakeholders to introduce the CSG project manager and discuss the project. A schedule will be developed for the project and milestones set for the major tasks.

Project Development
Define individual project parameters and scope in coordination with the City and the various agencies; review priorities, opportunities, and constraints as they may impact each project; and provide liaison and coordination with the various agencies for the development of cooperative projects. Administer project compliance with applicable permits, codes, funding requirements, regulations, and entitlements.

SECT ION 6

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
14 TASK 2 – Research and Data Collection
CSG will coordinate with the City to verify that any predesign information such as surveys, soils reports, hazardous material surveys (if necessary), NEPA and/or CEQA documentation is complete readily available for use by the design-build team.

CSG will research the latest trends in public swimming pools materials, equipment and safety procedures with City personnel and the project’s key stakeholders to establish priorities, goals, and objectives for the projects. Assemble related information and develop strategies. Determine the necessary quantitative requirements and limits including limitations set by funding.

TASK 3 - Prepare Design-Build RFP
Project Scope—The Project Manager will prepare a scope of work for the solicitation of project designbuild teams that may include preliminary specifications and estimates for the further development by the selected Design-Build Team.This preliminary scope of work will reflect the needs and desires of the City and its stakeholders in upgrading the two pools.

RFP Documents—CSG will prepare the a draft RFP and issue to the City review and approval. Once the RFP has been approved by the City, CSG will work with the City to upload onto the City’s website for the solicitation of a design-build team.

TASK 4 – Bidding Support and Selection
Pre-Bid Conference and Job Walk—Conduct pre-bid conferences and job walks with prospective Bidders to familiarize them with the RFP Documents, prepare a record of the questions and answers discussed at the pre-bid conference and job walk, and address these questions by preparing addenda.

Bids Submittal and Review—CSG can assist the City with the evaluation of bids for completeness and accuracy through verification for compliance with the RFP Documents. If there is a cost component, CSG can compare listed bid prices to the City reconciled cost estimate and cost database to determine if all project work components have been included in the design-build contractor’s bid and if required, make a recommendation to the City for contract award.

Pre-Award Conferences—If required, our staff will conduct pre-award conferences with the successful design-build contractor.

TASK 5 – Review Design-Build Plans, Specifications, and Estimates Constructability Review— The CSG constructability review process will analyze the plans, specifications and estimates submitted by the selected design-build team for buildability by reviewing and making recommendations to the City with respect to clarity, consistency, constructability, construction cost, sequence of construction, and construction duration. The review will be performed at each submittal phase listed in the RFP and will include an on-going effort by CSG until an approved final set of Construction Set Documents has been issued, i.e., once the project is ready for construction. Some standard elements for review as part of constructability review include site logistics, constraints; conformance among plan/spec design disciplines; conformance with applicable codes and standards; scheduling requirements and restrictions; site safety and access; long lead items and current market conditions/construction costs.

Constructability reviews establish project duration, milestone dates, complexity of design, necessities for construction, expected means and methods, and gives a genuine and realistic idea of what it will take to complete the project from a design-builder perspective and will be the first in what will be multiple items of QA/QC work by CSG on behalf of the City.

Value Engineering— CSG considers the design development period as the most important time with respect to Value Engineering. During this critical stage CSG will review and comment on areas believed to be either over-designed or economically lacking. With the help of the design team, CSG will facilitate revisions to

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
15 ensure efficient and economic design criteria are met. The key to Value Engineering is to maintain the project’s design integrity while altering means and methods being provided by the future Contractor as part of their bid. Typical areas for identifying potential Over-Design scope, pinpointing when direct Owner procurement of items is beneficial, evaluating specified building control/management system functions and operation, material types and quantities, procuring materials locally, Pre-selecting specific means/methods for construction.

Cost Estimating and Scheduling— CSG will review the cost estimates provided with each design submittal to ensure compliance with the City’s project budget, and when there is a difference in costs work with the City to identify reasons for such difference and recommend means to eliminate the difference.

Project Budget—We will evaluate the current City estimate to determine if the current estimate is in alignment with the City Budget for the project and represent the current costs within the industry and work with the City to estimate costs and validate the project budget including contingencies for the project.

Project Schedule—CSG will develop a baseline project schedule that integrates the design team activities with the anticipated construction schedule for the contractor and include the milestones and key activities for the project. Overall progress of work will be measured monthly against this baseline schedule and adjustments made when required. The design-build teams work will be regularly reviewed and monitored for progress against the scheduled milestones, and CSG will advise the City on necessary actions to prevent, minimize or recover from delays. The Schedule will be maintained using the latest available version of the Microsoft Project scheduling software program.

Meetings— CSG will attend all project meetings with City and the Design-Build Team, and all programming and site planning meetings relating to the Project.

TASK 6 – Construction Support
Our approach to construction management is through coordination, communication, reporting, efficiency, and the right expertise to match the project’s specific needs. During this phase, CSG will administer the construction contracts and facilitate communication between the contractors, the Architect, and the City to complete the Project in accordance with the contract documents. We will closely monitor the construction progress and recommend courses of action to the City for any delay or contractor failure to fulfill contractual requirements. We will coordinate the preparation of construction staging areas on-site for the Project and coordinate the preparation of the site for construction, the mobilization of all contractors and construction sequencing.

Some standard items of work that CSG will perform during this phase include:

Temporary Facilities for City Staff— If required, we will work with the City during the preconstruction pkhase to identify and determine a feasible location, research, and select the type of temporary structure, assist with the connection of utilities, and coordination the moving and storage associated with the temporary relocation.

Contract Notice to Proceed– CSG shall administer and review the Contract Agreement with the selected Contractor. Once all items have been reviewed, scope of work verified, and standard logistics addressed, CSG will recommend the City execute the agreement and issue a Notice to Proceed to the Contractor.

Pre-Construction Conference—CSG shall facilitate and conduct a Pre-Construction Conference with the Awarded Design-Build Contractor. CSG will then coordinate the Contractor mobilization period and submission of schedule of values with various items of work.

Project Office—Set up a construction project office, as needed, for use by the City and CSG staff and coordinate with the City for connections for computer equipment.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
16 Permits—Assist the City and the Contractor in obtaining all necessary permits for the Project.

Meetings—CSG will schedule, conduct, and participate in weekly job site progress meetings, plus quality control and special meetings with the City, Contractor, and any other stakeholders involved in the Project to discuss such matters as procedures, progress, quality, and scheduling. CSG will prepare and distribute meeting minutes.

Construction Schedule Monitoring— Our team will conduct weekly project meetings to review the project status, update the project schedule, discuss any outstanding items, resolve disagreements and work collaboratively towards the successful completion of each phase of the project. The contractor construction schedule will be used during these meetings as a tool to track the progress of construction relative to the approved baseline. All changes that impact on the baseline schedule will be closely monitored and discussed at the weekly meetings.

Change Management—CSG's goal on every project is to resolve changes to the contract expeditiously to mitigate potential claims or disputes. CSG will maintain a submittal log that tracks the processing of change order requests CORs and approval of change orders (COs). (CSG can provide the following but related costs for CSG are not included in this proposal) CSG can provide Change Order and Claim Management is as follows:
▪ Review all documents and coordinate with Design-Build Contractor to substantiate validity of the Change Request
▪ If valid, determine Impacts to Schedule
▪ Develop City estimate for CORs.
▪ Negotiate final costs on behalf of the City.
▪ Provide recommendations to the City for approval or rejection. ▪ can provide estimates for change order requests (CORs) and assist with any analysis of any contractor Time Impact Analyses (TIA).

Project Costs—CSG will track all project costs for work performed by the Contractors to ensure compliance with the Project budget and manage project contingencies and allowances.

Safety—CSG will ensure that its personnel are trained on jobsite safety, and shall review the construction contractor(s)’ Safety Program submittals and review and document the implementation of the construction contractor(s)’ Safety Program and applicable Cal OSHA requirements by ensuring that the contractor(s) submit a job-specific safety plan for the project, discuss safety at each construction meeting, require a pretask analysis and planning for critical events (such as crane picks), require weekly toolbox safety specific meetings for all field personnel, conduct frequent safety inspections by both project and home office personnel, and live by a zero tolerance policy for unsafe acts or practices on our job sites. CSG will also coordinate safe access to the site for inspections and site visits by the City staff and consultants.

Punch List— All project team members will be required to complete a punch list that will be consolidated into one comprehensive list that will be given to the contractor for completion. CSG will work with the Architect and Contractor to ensure proper completion of all items as listed on the “Punch List” prior to recommending the City release the Contractor’s Notice of Completion.

TASK 7 – Project Close-Out
During this phase, CSG will coordinate and schedule for the City occupying the new facility and the closeout of open items on the project. After construction is completed, CSG will manage the close-out, building commissioning and move-in activities and facilitate all required training, acquisition of operations and maintenance manuals, operating procedures, and record documents. Some items of work will include:

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
17 Furniture, fixtures, and Equipment (FF&E) Install – Upon completion of construction by the Contractor, CSG can oversee and manage the installation of furniture, fixtures, and equipment.

Move Management—CSG can coordinate City user relocations and occupancy into the new facility.

Training Sessions—We will coordinate with and schedule the required attendees for each training session or commission and manage the training and commissioning sessions.

Closeout Submittals—CSG will manage the closeout submittal process on the City's behalf. Standard closeout submittals include Operations & Maintenance Manuals, Tests and Balancing Reports, Final As Built and Record Drawings, Warranties, Releases, Bonds and Waivers, Keying/Keys, Commissioning Reports.

Final Completion—The final stages of Construction Management services by CSG shall occur once all work is complete, Staff has occupied the facility, pending claims have been released and closeout documents have been sufficiently reviewed and accepted. At that time CSG will coordinate with the City for Final Acceptance; Final Payment(s), Notice of Completion, Release of Contractor Retention, and Certificate of Occupancy.

Furthermore, CSG shall be available in response to initial post-occupancy complaints about missing or malfunctioning building components and equipment, and contractor/vendor warranty items.

Warranty Inspections- Finally, CSG can coordinate and conduct a year-end walk through immediately prior to the expiration of the warranty period, coordinate the repair of any defects and deficiencies and completion of the project.

CSG PROPOSAL TO THE CITY OF COMPTON

AQUATIC FACILITY CONSTRUCTION CONSULTANT SERVICES
18 Appendix
Resumes for key team members are hereby included:

1. Peykan Abbassi, P.E. – Point of Contact (Principal Engineer)

2. Cyril Charles, P.E. – Mechanical Engineer

3. Paul Young – Architect
SECT ION 7
19 Peykan

LICENSES &

CERTIFICATIONS
Professional Civil Engineer
State of California |51996
Board of Professional Engineers and
Land Surveyors
LEED AP Certificate, United States
Green Building Council
Project Management Certificate,
Bureau of Engineering, City of Los
Angeles
Certificate in Effective Negotiation,
Karrass Institute

EDUCATION
MS Civil Engineering,
University of Southern California
BS Civil Engineering,
University of Southern California
Abbassi PE, LEED AP
Principal En gineer (Poin t of Contact)
Mr. Abbassi is an experienced civil engineer for large programs in Public Works, Transportation, Development and Municipal Engineering with 35 years of experience.

Through the creation of a team environment and project ownership atmosphere he achieved outcomes above and beyond the expected performance levels. He consistently developed cohesive management teams and has experience working with various funding sources and regulatory agencies.

R E L E V A N T E X P E R I E N C E
Project Manager & Construction Manager | Navigation Center Project, City of Vallejo, CA Mr. Abbassi provides project management services for the Navigation Center in Vallejo with approximate budget of $8 million. The project included: all real estate transaction agreements; on and off-site improvements; a Sprung Structure dormitory that sleeps 125 individuals; a Sprung structure services building that provides operation, dental and medical services; and a Linked Building restroom that include showers. Mr. Abbassi works with the design team, contractor, operators, and City staff to ensure the project is completed on time and within budget. His duties include cost estimating; negotiation of subconsultants’ fees; coordinating real estate agreements with Vallejo Flood and Wastewater District and Kiewit; managing the design and construction of the project; lead weekly meetings with the design team, contractor and City staff; and communicating with operators and services providers of the site.

Building Project Management/Construction Management
In the following projects, as the PM/CM I managed planning department requirements, entitlements, public improvement design and construction (B-permit work) in addition to the building permitting process through various regulatory agencies inside and outside the City.

Collaboration and communication with the stakeholders on a regular basis were the reasons for on time and on budget delivery of the projects. In addition, I negotiated the A&E contracts, managed the A & E consultants, and the PM/CM firm augmented the City’s staff. • Police Administration Building Program (Total program budget $430 M Hard and Soft cost, 3-Buildings plus a data center)
Deputy Program Manager
A. Police Administration Building (PAB): $240 M construction budget, value engineered $16 M, 500,000 SF, 10-story with 396 2-level subterranean parking.

B. Motor Transport Division/Main Street Parking (MTD/MSP): $72 M construction budget; 396,000 SF 800 parking in 5-level plus roof, 20,000 SF service shop with 10 service bays, 4 fueling stations, and two level 6000 SF office space.

C. Aiso Street Parking (ASP): $22 M construction budget, 120,000 SF, 300- parking spaces, 2-level subterranean parking with 45,000 SF street level Plaza for Little Tokyo Community events.
• Griffith Observatory Renovation and Expansion: $83 M construction budget, Project Engineer/Construction Manager.
• Pacoima-Gonzales Boxing Facility: $1.5 M construction budget Project Manager/Construction Manager
• Echo Park Childcare Center: $4 M construction budget
Project Manager/Construction Manager
20 Construction Manager/Project Engineer | City of Los Angeles, Construction Management Division Mr. Abbassi performed Construction Management for the $75 million Griffith Observatory Renovation and Expansion Project. He conducted comprehensive coordination between the design and construction activities. Mr.

Abbassi managed A/E consultants and the planning and permit process. Other municipal facilities he managed included Echo Park Childcare Facility and Pacoima Boxing and exercise facility.

Deputy Program Manager | City of Los Angeles, Police Administration Building Program Under a program budget of $430 million, Mr. Abbassi assisted the program manager with budget analysis and continuous monitoring of construction expenditures and consultant contracts. He served as the Project Manager leading the overall planning and management for Metro Transit Division/Main Street parking an 800 stalls parking in a five level, six story structure with a 20,000-sq. ft., 10 bay, 4 fueling stations with a construction budget more than $72 million. He also managed the Aiso Parking Structure, a 300 stalls subterranean structure with a plaza at street level. He managed consultant architects, mechanical, electrical, plumbing, structural, civil, landscaping, security and art consultants.

City Engineer | City of Half Moon Bay, CA
Mr. Abbassi was responsible for complex and technical tasks related to capital infrastructure, utilities, traffic studies and management, land development and other public works-related projects and programs ensuring compliance with all codes and regulations. His work included managing consultants for storm drain and sewer master plans as well as design consultants for the CIP.

Heavy Civil Program Management/Project Management/Construction Management • Chief Development Officer: Lead the Engineering, CIP program, Signal and Systems including Positive Train Control (PTC) projects. Managed the oversight and implementation of over $1 Billion LOSSAN projects, $10 Million North County Transit District (NCTD) CIP Program including two bridge repair (Bridge 243, and 217), Solano Beach station slope stabilization, Del Mar Bluff failure study, design recommendations and implementation, Inland corridor eroded slope repair, and $87 Million NCTD’s PTC projects. • Project Manager: The lead engineer to coordinate and perform oversight of public works improvement for two LAMTA (Los Angeles Metropolitan Transportation Authority) projects (EXPO II, and Regional Connector) for the City of Los Angeles Department of Public Works
• Construction Manager: Installed 5 Storm Drain Filtering systems on major storm drain lines throughout the City of Los Angeles. Average construction costs $1.2 M/unit. • Change Order Engineer: 250 Projects exceeding $63 M (cumulative) construction cost, and a copy of the list of the projects (11 pages) from the logbook is available upon request. I negotiated all the change orders for the 250 projects from 1993 to 2000 (7 years). Among the list are 50 Emergency Sewer and Emergency Storm Drain projects which I was responsible to award, and analyze, negotiate, and approve the cost. Five of these were FEMA funded projects due to the emergency nature and the declaration for emergency in Los Angeles County in 04/05 rainy season. I received commendation and was acknowledged by the Board of Public Works for efficient and timely management of the emergency projects in addition to productive collaboration with the City forces and the contractors. 21 Cyril

LICENSES &

CERTIFICATIONS
Professional Mechanical Engineer
State of California
| M28217
LEED AP Certificate, United States
Green Building Council

EDUCATION
MS Mechanical Engineering,
California State University,
Los Angeles
BS Mechanical Engineering,
University of the West Indies,
Trinidad
Charles ME, LEED AP
Sen ior Project Man ager
Mr. Charles is a previous City of Los Angeles, Department of Public Works senior engineer and project manager. He is a licensed professional engineer with 25+ years of project and construction management experience in all phases of projects who has successfully managed and completed several large municipal facility projects through coordination, developing partnerships, and building positive relationships with architects, engineers, contractors, code enforcement officials, and vendors. Mr. Charles has prepared and issued RFPs, managed contracts for project consultants and contractors including selection and has been responsible for project scope, schedule, cost, and stakeholder management. He has also designed mechanical and plumbing systems for projects and has knowledge of codes and Title 24 compliance. He has been the Owner representative for commissioning and delivery of several LEED projects throughout the City of Los Angeles.

R E L E V A N T E X P E R I E N C E
Project and Construction Management
o Los Angeles Convention Center Renovation and Expansion Project – Project manager to develop Schematic Design (SD+) documents for this estimated $900M+ PublicPrivate-Partnership (P3) project. o Silverlake Reservoir Master Plan Project –Project manager for development of a master plan for this urban reservoir site to include request for proposals (RFP) preparation and issuance, consultant selection and management, and stakeholder management. o LAPD Metro Detention Center – Project Manager for the construction of 512 beds, $85M, 160,000 sq. ft. detention center.
o LAPD Metropolitan Division Facility– Project Manager for the design and construction of this $20M. renovation to the old 62,000 sq. ft. Rampart Police Station. This is a LEED Platinum project.
o Rampart Area Police Station – Project and construction manager for this 52,000 sq. ft. police facility with a 280-vehicle parking garage, vehicle repair facility, car wash and fuel dispensing station.
o West Valley Area Police Station – Construction manager for this 46,000 sq. ft. police facility with a 330-vehicle parking garage, 6,700 sq. ft. vehicle repair facility, car wash and fuel dispensing station.
o City Hall East Data Center Server Upgrade Project – Managed the construction of an expansion upgrade to this data center for the City Hall complex. This project included the installation of an adiabatic chiller as the main source of cooling for the facility. o Los Angeles Convention Center Solar Photovoltaic Project – Project manager for the installation of 2.2 MW of solar panels to the roof of the South Hall building. o North Central Animal Shelter Renovation and Expansion - Project and construction manager for the $23M expansion and renovation of this animal shelter facility.

Plumbing and HVAC Design Projects
o East Valley Solid Resources Management Complex – Designer for HVAC and plumbing systems for a new $30M Bureau of Sanitation facility complex with an administration building, truck maintenance facility, hazardous waste disposal building, and container storage building.
o Pacoima Branch Library – Designer for HVAC and plumbing systems for a new 10,500 sq. ft. library facility.
22 Paul

LICENSES & CERTIFICATIONS
Licensed Architect
State of California | C-19758
Project Management Certificate
City of Los Angeles
Certification - Building Plans Examiner,
International Code Council (ICC)

EDUCATION
BS Architecture,
Howard University, Washington D.C.

Graduate Study in Architecture,
University of Washington
Seattle, Washington
Young
Project M anager - Arch itect
Paul Young is a California Architect with experience with various types of municipal buildings. He has experience in project management, programming, architectural design, and design review. He has coordinated the activities of design consultants among the design disciplines and with the project recipient. He has prepared various status reports for government entities and completed board reports for governing agencies. Has managed contracts, reviewed schedules, invoices, and contract changes. He has worked on the traditional design/bid/build and design/build delivery projects.

R E L E V A N T P R O J E C T E X P E R I E N C E
Project Manager | Los Angeles Street Civic Building
Project Manager for the development of programming and technical requirements for a 20- story, 970,000 square foot office building with 1,173 parking spaces) as a Public/Private Partnership project. Also managed the EIR process for the demolition of Parker Center, the old Los Angeles Police Department LAPD Headquarters building, and the construction of this 20- story office building project. Parker Center was constructed in 1954 was considered an historic building.

Project Manager | Boyle Heights Neighborhood City Hall
Project Management, programming, pre-design, design & construction management for the “Chicago Building”, a 25,000 sq. ft. unreinforced masonry building that was used to accommodate City departments in service to the Boyle Heights neighborhood. The building was purchased and upgraded for seismic safety and to serve as the Boyle Heights Neighborhood City Hall, a constituent service building for the community.

Project Manager | Demolition of Parker Center
The demolition of an eight-story building of approximately 360,000 square feet with two basements that once served as the headquarters for the Los Angeles Police Department. This project also required significant hazardous material abatement prior to the start of demolition.

Project Manager | Asphalt Plant No. 1
A design-build for a $15M project involving the selective demolition of an old administration building and the old asbestos plant and the construction of a new asphalt plant with the ability to utilize recycled asbestos. In addition, the project included an administration building that provided office space and facilities for on-site employees at the Plant.

Project Manager | South District Sewer Sanitation Maintenance Yard (SDMY) SDMY involved the replacement of facilities used for the upkeep of the sewers in the southern region of Los Angeles. The size of the vacuum trucks used for cleaning clogged sewers grew beyond the capacity of the yard of one acre. The existing facility consisted of an administration building and several masonry garage buildings. The buildings were demolished and replaced with a new administration building with office space facilities for the employees that drove the trucks and performed the maintenance activities.

Project Manager | Felipe de Neve Branch Library
Seismic reinforcement and expansion of an unreinforced masonry building built in the 20’s with funds provided by the Carnegie Foundation. One of many Carnegie libraries from this era to be seismically upgraded by the City.

Project Manager | Van Ness Park Gymnasium
Construction of a new gymnasium that accommodates a high school sized basketball court in an existing park in central Los Angeles. The design was from a template derived from the Pecan Park Gymnasium.

WWW.CSGENGR.COM
888.794.2016

CENTRAL COAST
• Paso Robles •

SOUTHERN CALIFORNIA
• Orange •

OFFICES

THROUGHOUT

CALIFORNIA

SAN FRANCISCO BAY AREA
• Foster City • San Jose • Pleasanton •

SACRAMENTO REGION
• Sacramento •

CENTRAL VALLEY
• Newman • Fresno •
April 16, 2024
TO: HONORABLE MAYOR AND COUNCIL MEMBERS
FROM: MUNICIPAL WATER DEPARTMENT
SUBJECT: A RESOULTION OF THE CITY COUNCIL OF COMPTON AMENDING THE MUNICIPAL WATER DEPARTMENT’S ARPA FISCAL YEAR 2023- 2024 BUDGET, AUTHORIZING THE CITY MANAGER TO ENTER INTO A THREE (3) YEAR SERVICE AGREEMENT AND TO ESTABLISH A
PURCHASE ORDER FOR ZORRO LANDSCAPE INC. FOR THE
PURPOSE OF LANDSCAPE MAINTENANCE SERVICES FOR TWO (2)

WATER STORAGE TANK SITES IN AN AMOUNT NOT TO EXCEED
FIFTY-SEVEN THOUSAND SIX HUNDRED DOLLARS ($57,600).

SUMMARY
The City Council will consider a resolution authorizing the City Manager to amend the Municipal Water Department’s ARPA Fiscal Year 2023-2024 Budget, enter into a Service Agreement and establish a purchase order for Zorro Landscape, Inc. (“Zorro”) for fiscal years 2024-2024, 2024-2025 and 2025-2026 to provide routine landscaping services for two (2) Municipal Water Department water storage tank sites located at 18604 Wilmington Avenue and 1300 El Segundo Blvd. in an amount not to exceed Fifty-Seven Thousand Six Hundred Dollars.

BACKGROUND
The Compton Municipal Water Department (“Department”) is an Urban Retail Water Supplier providing water services to approximately 80% of the incorporated City limits.

The water system consists of approximately 156 miles of water mains, 1,500 fire hydrants, 3,500 valves, 8 water wells, 2 water storage tank locations with 5 storage tanks total and 1 booster pump station.

The City’s Municipal Water Department’s water storage tanks are located at: (1) 18604 Wilmington Avenue and it houses four (4) water storage tanks containing approximately 3 million gallons of water each, and the second location is at 1300 El Segundo Blvd. (Sibrie Park) and houses one (1) water storage tank which stores approximately 750,000 gallons of water.

It is essential to keep the areas surrounding the water storage tanks properly and regularly landscaped to avoid any type of water contamination.

Landscape maintenance of water sites provides the following benefits:

10. Staff Report Zorro Landscape Inc.

April 9, 2024
Page | 2

1. Water Quality: Proper landscaping can prevent erosion, sedimentation, and runoff, which can degrade water quality. Healthy vegetation acts as a natural filter, reducing the influx of pollutants into the reservoir.

2. Ecosystem Stability: The surrounding landscape provides habitats for diverse flora and fauna. Preserving these ecosystems ensures biodiversity and ecological balance, which are essential for the overall health of the environment.

3. Water Conservation: Strategic landscaping can help conserve water by minimizing evaporation and regulating water flow. Trees and other vegetation provide shade, reducing water loss through evapotranspiration and helping to maintain water levels.

4. Aesthetic Value: Well-designed landscapes enhance the visual appeal of water reservoirs, making them more attractive recreational areas for residents and visitors. Aesthetic surroundings can also boost property values and promote community pride.

5. Flood Mitigation: Thoughtful landscaping can mitigate the risk of flooding by absorbing excess water and reducing surface runoff. Wetlands, riparian buffers, and other natural features help regulate water flow and minimize flood damage.

6. Climate Resilience: Climate-resilient landscaping practices, such as planting native species and implementing green infrastructure, can help buffer the impacts of climate change on water resources. These measures enhance the resilience of water reservoirs to extreme weather events and shifting precipitation patterns.

In summary, maintaining the landscape around water tanks/reservoirs is essential for safeguarding water quality, supporting ecosystems, conserving water, enhancing aesthetics, mitigating floods, and building climate resilience.

STATEMENT OF THE ISSUE
The Compton Municipal Water Department (“Department”) has two sites that have water storage tanks located on them. There is one site located in the industrial area of the City at 18604 Wilmington Avenue and a second site located in the residential area of the City at 1300 El Segundo Blvd (Sibrie Park). These parcels require continuous landscape maintenance; which includes weed abatement, trimming services, blowing, hauling and debris removal. The Municipal Water Department would like to contract with a qualified Landscaper to perform landscape maintenance at the water tank storage sites to keep these areas safe from contamination, regularly maintained, and aesthetically pleasing for the community.

In October of 2023, the Municipal Water Department solicited quotes for landscape maintenance services. Three quotes were received as follows:

Contractor Compton Water Tank
Storage Sites
Monthly
Cost
Annual
Cost
Zorro Landscape,
Inc.
18504 Wilmington Ave
1300 El Segundo Blvd
$1600.00 $19,200.00
Staff Report Zorro Landscape Inc.

April 9, 2024
Page | 3
Hidden Gem
Landscaping
18504 Wilmington Ave
1300 El Segundo Blvd
$1700.00 $20,400.00
Excellence
Landscaping
18504 Wilmington Ave
1300 El Segundo Blvd
$2200.00 $26,400.00
Zorro Landscape, Inc. submitted the lowest most responsive bid to the City’s request for landscape maintenance services. It is recommended that Zorro Landscape, Inc. be awarded the Service Agreement to provide landscape maintenance services for the Compton Municipal Water Department at the two (2) water storage tank sites.

The proposed landscape maintenance services shall include monthly: tree trimming, weed abatement, leaf blowing, hauling and debris removal.

ARPA FUND – Drinking Water State Revolving Fund Eligible Uses:

Assistance may be provided to any municipality or intermunicipal, interstate, or State agency for publicly owned water quality projects that remediate or prevent contamination from resource extraction sites. Section 603(c) (1).

FISCAL IMPACT
The Municipal Water Department has a balanced budget and the recommendations are cost neutral to the ARPA funds and do not have a negative impact on the City’s 2023- 2024 Fiscal Year Budget.

After the transfer of funds in the amount of Fifty-Seven Thousand Six Hundred Dollars for fiscal years 2023-2024, 2024-2025, and 2025-2026 ($19,200 annually) are allocated in Municipal Water Department’s ARPA (American Rescue Plan Act) Account 2810-86- 0000-4236/Maintenance/Repair for this expenditure, a purchase order will be established for Zorro Landscape, Inc. for landscaping services for two (2) water storage tank sites located at 18604 Wilmington Avenue and 1300 El Segundo Blvd.

Decrease Budget Account
o 2810-860-000-4391 Capital Outlay- Other $57,600
Increase Budget Account
o 2810-860-000-4236 Maintenance/Repair $57,600
The following budget transactions are necessary in order to transfer funds between ARPA accounts to pay landscape maintenance contractor to properly and regularly maintain multiple Municipal Water Department sites.

RECOMMENDATION
Staff recommends that the City Council adopt the attached Resolution authorizing the City Manager to make budget amendments to the Water Department’s Fiscal Year 2023- 2024 ARPA Budget, authorize the City Manager to enter into a Service Agreement for Staff Report Zorro Landscape Inc.

April 9, 2024
Page | 4
fiscal years 2023-2024, 2024-2025 and 2025-2026 and to issue a purchase order to Zorro Landscape, Inc. in an amount not to exceed Fifty-Seven Thousand Six Hundred Dollars $57,600.

JOSE GARFIAS

INTERIM GENERAL MANAGER

MUNICIPAL WATER DEPARTMENT
APPROVED FOR FORWARDING:

WILLIE A. HOPKINS

CITY MANAGER
RESOLUTION NO. ___________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON AMENDING THE MUNICIPAL WATER DEPARTMENT’S ARPA FISCAL YEAR 2023-2024 BUDGET, AUTHORIZING THE CITY MANAGER TO ENTER INTO A THREE (3) YEAR SERVICE

AGREEMENT AND TO ESTABLISH A PURCHASE ORDER FOR ZORRO LANDSCAPE INC. FOR THE PURPOSE OF LANDSCAPE MAINTENANCE SERVICES FOR TWO (2)

WATER STORAGE TANK SITES IN AN AMOUNT NOT TO EXCEED FIFTY-SEVEN THOUSAND SIX HUNDRED DOLLARS ($57,600).

WHEREAS, the Compton Municipal Water Department (“Department”) is an Urban Retail Water Supplier providing water services to approximately 80% of the incorporated City limits; and
WHEREAS, the water system consists of approximately 156 miles of water mains, 1,000 fire hydrants, 1,000 valves, 8 water wells, 2 water storage tank locations with 5 storage tanks total and 1 booster pump station; and
WHEREAS, there are water storage tanks located at: (1) 18604 Wilmington Avenue houses four (4) storage tanks containing approximately 3 million gallons of water each and (2) 1300 El Segundo Blvd. (Sibrie Park) houses one (1) water storage tank which stores approximately 750,000 gallons of water; and
WHEREAS, it is essential to keep the areas surrounding the water storage tanks properly and regularly landscaped to avoid any type of water contamination; and WHEREAS, landscape maintenance of water sites provides the following benefits:

1. Water Quality: Proper landscaping can prevent erosion, sedimentation, and runoff, which can degrade water quality. Healthy vegetation acts as a natural filter, reducing the influx of pollutants into the reservoir.

2. Ecosystem Stability: The surrounding landscape provides habitats for diverse flora and fauna. Preserving these ecosystems ensures biodiversity and ecological balance, which are essential for the overall health of the environment.

3. Water Conservation: Strategic landscaping can help conserve water by minimizing evaporation and regulating water flow. Trees and other vegetation provide shade, reducing water loss through evapotranspiration and helping to maintain water levels.

4. Aesthetic Value: Well-designed landscapes enhance the visual appeal of water reservoirs, making them more attractive recreational areas for residents and visitors.

Aesthetic surroundings can also boost property values and promote community pride.

5. Flood Mitigation: Thoughtful landscaping can mitigate the risk of flooding by absorbing excess water and reducing surface runoff. Wetlands, riparian buffers, and other natural features help regulate water flow and minimize flood damage.

6. Climate Resilience: Climate-resilient landscaping practices, such as planting native species and implementing green infrastructure, can help buffer the impacts of climate change on water resources. These measures enhance the resilience of water reservoirs to extreme weather events and shifting precipitation patterns; and WHEREAS, in summary, maintaining the landscape around water tanks/reservoirs is essential for safeguarding water quality, supporting ecosystems, conserving water, enhancing aesthetics, mitigating floods, and building climate resilience; and WHEREAS, in October of 2023, the Municipal Water Department solicited quotes for landscape maintenance services. Three quotes were received as follows:

Contractor Compton Water Tank
Storage Sites
Monthly
Cost
Annual
Cost
Zorro Landscape,
Inc.
18504 Wilmington Ave
1300 El Segundo
$1600.00 $19,200.00
Hidden Gem
Landscaping
18504 Wilmington Ave
1300 El Segundo
$1700.00 $20,400.00
RESOLUTION NO. ________________

Page 2 ends

Excellence
Landscaping
18504 Wilmington Ave
1300 El Segundo
$2200.00 $26,400.00
WHEREAS, the Zorro Landscape, Inc. company submitted the lowest most responsive bid to the City’s request for landscape maintenance services and it is recommended that Zorro Landscape, Inc. be awarded the Service Agreement to provide landscape maintenance services for the Compton Municipal Water Department at the two (2) water storage tank sites; and
WHEREAS, ARPA FUND – Drinking Water State Revolving Fund Eligible Uses states: Assistance may be provided to any municipality or intermunicipal, interstate, or State agency for publicly owned water quality projects that remediate or prevent contamination from resource extraction sites. Section 603(c) (1).

WHEREAS, after the transfer of funds in the amount of Fifty-Seven Thousand Six Hundred Dollars for fiscal years 2023-2024, 2024-2025, and 2025-2026 ($19,200 annually) are allocated in Municipal Water Department’s ARPA (American Rescue Plan Act) Account 2810-86-0000-4236/Maintenance/Repair for this expenditure, a purchase order will be established for Zorro Landscape, Inc. for landscaping services for two (2) water storage tank sites located at 18604 Wilmington Avenue and 1300 El Segundo Blvd.

Decrease Budget Account
 2810-860-000-4391 Capital Outlay- Other $57,600
Increase Budget Account
 2810-860-000-4236 Maintenance/Repair $57,600

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. That the City Manager is hereby authorized to make the following budget amendments to the Municipal Water Department APRA 2023-2024 Fiscal Year budget:

Decrease Budget Account
o 2810-860-000-4391 Capital Outlay- Other $57,600
Increase Budget Account
o 2810-860-000-4236 Maintenance/Repair $57,600
Section 2. That the City Manager is hereby authorized to enter into a three (3) year Service Agreement with Zorro Landscape, Inc. for fiscal years 2023-2024, 2024-2025 and 2025-2026 to provide landscape maintenance service at the two (2) Municipal Water Department water tank storage sites; 18604 Wilmington Avenue and 1300 El Segundo Blvd.

Section 3. That a purchase order is hereby authorized to be established for Zorro Landscape, Inc. from Account No. 2810-860-000-4236 Maintenance/Repair to provide landscape maintenance in an amount not to exceed Fifty-Seven Thousand Six Hundred Dollars ($57,600 for fiscal years 2023-2024, 2024-2025 and 2025-2026, $19,200 annually).

Section 4. That funds for this expenditure in the amount of will be available in the Municipal Water Department fiscal year 2023-2024 budget in Account No. 2810-860-000- 4236 Maintenance/Repair for this expenditure.

Section 5. That copies of this Resolution shall be filed in the offices of the City Manager, City Controller, City Clerk, City Attorney and the Municipal Water Department.

Section 6. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

RESOLUTION NO. ________________

Page 3 ends

ADOPTED this _____________ day of ______________, 2024. ________________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
____________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Vernell McDaniel, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on the __________ day of ____________________, 2024.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERSABSENT: COUNCIL MEMBERS- ____________________________________

CITY CLERK OF THE CITY OF COMPTON

SERVICES AGREEMENT

BETWEEN

THE CITY OF COMPTON
AND
ZORRO LANDSCAPE INC.

This AGREEMENT is entered by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) located at 205 South Willowbrook Avenue, Compton, California 90220, and ZORRO LANDSCAPE INC. (hereinafter referred to as “CONTRACTOR”), located at 10509 Angell Street, Norwalk, CA 90650

RECITALS
The City of Compton Municipal Water Department has determined that it requires a contractor to provide landscape services at two storage tank sites: (1) 18604 Wilmington Avenue and (2) 1300 El Segundo Blvd.

The Contractor represents that it is fully qualified to perform such services by virtue of its experience and the training, education and expertise of its principals and employees. Contractor further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

AGREEMENT:

1. Services to be Rendered by Contractor. It is the mutual understanding of the parties that the Contractor shall perform and be responsible for providing and rendering the following services, which shall include, but not be limited to the below-indicated tasks and deliverables:

Monthly Maintenance:
 Weed removal
 Trimming trees under 10ft
 Leaf Blowing
 Hauling
 Debris Removal
Contractor acknowledges that in entering into this Agreement the City is relying on Contractor's special skills and experience to do and perform the services in accordance with best standards of professional practice. While performing the Services, Contractor agrees to perform all the said work and furnish all the necessary materials at its own cost and expense necessary to complete said services in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances and to the reasonable satisfaction of the City.

Contractor services hereunder shall be performed in good, workmanlike and professional manner. Contractor shall be responsible for correcting and completing all errors and omissions related to the services provided by the Contractor for this Agreement at no additional cost to the City. “Errors” and “Omissions” for purposes of this paragraph are defined to mean a failure by the Contractor to meet the standards of its profession as set forth in the preceding paragraph.

Service Agreement
ZORRO LANDSCAPE INC.

Page 2 ends

2 | P a g e
The acceptance of the services by City does not release Contractor from these obligations.

Contractor will be responsible for employing or engaging all persons necessary to perform the services. All of Contractor's staff will be qualified by training and experience to perform their assigned tasks. Contractor will give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and subcontractors, if any, and will keep the services under its control. On demand of City, if any employee or subcontractor of Contractor fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the services performed pursuant to this Agreement.

2. Duration of Contract. Contractor agrees to commence the services provided for herein upon written Notification to Proceed from the City and to continue in a diligent and professional manner, for the duration of the term of this agreement upon completion of the work notated in Scope of Work. The Agreement is proposed for fiscal years 2023-2024, 2024-2025, and 2025-2026.

Contractor will generally adhere to the schedule set forth by the City provided, that City will grant reasonable extensions of time for the performance of the services occasioned by unusually lengthy governmental reviews of Contractor’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Contractor’s officers or employees.

Contractor acknowledges the importance to City of City’s project schedule and agrees to put forth its best professional efforts to perform the services in a manner consistent with that schedule. City understands, however, that Contractor’s performance must be governed by sound practices. Contractor will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

3. Compensation. The method of payment for this Contract will be on a fixed basis as specified within Contractor’s Cost Proposal. The total price paid the Contractor will include compensation for all work, including travel, materials, supplies, vendor services, expenses and subcontracted work. No additional compensation will be paid to the Contractor, unless there is a change in the scope of the work or the scope of the project. In the instance of a change in the scope of work or scope of the project, adjustment to the total compensation will be negotiated between the Contractor and the City. Adjustment in the total compensation will not be effective until authorized and approved in writing by the City.

Progress payments may be made in arrears based on the percentage of work and deliverables completed by the Contractor. If Contractor fails to submit the required deliverable items according to schedule or as required by the Agreement, except for those amounts that are due and not reasonably in dispute, the City shall have the right to delay payment and/or terminate this Agreement in accordance with the provisions noted herein.

Contractor shall be reimbursed within thirty (30) days, or as promptly as fiscal procedures may permit, upon receipt by the City of itemized invoices for services completed. Invoices shall Service Agreement
ZORRO LANDSCAPE INC.

Page 3 ends

3 | P a g e
be submitted no later than 45 calendar days after the performance of work for which the Contractor is billing. Invoices shall detail the work performed on each task as applicable. Invoices shall be delivered or mailed to the Director of [identify department] Department at the following address: City of Compton, 205 South Willowbrook Avenue, Compton, California 90220.

As compensation for performance of all the services performed by the Contractor pursuant to this Agreement, City shall pay, and Contractor agrees to accept, a not-to-exceed monthly sum of Sixteen Hundred ($1,600) Dollars. Contract not to exceed Fifty-Seven Thousand Six Hundred Dollars for the service period of three (3) fiscal years 2023-2024, 2024-2025, and 2025-2026.

In the event of termination, the Contractor shall be entitled to compensation for the undisputed reasonable value of services performed to the effective date of termination, including any noncancellable obligations incurred prior to termination; provided, however, that the City may condition payment of such compensation upon the Contractor’s delivery to the City of any and all City property, documents, reports, records, materials and work product associated with the performance of this Agreement.

4. Ownership of Materials. All product produced by Contractor or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Contractor or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. [Contractor will have the right to make one (1) copy of the Work Product for Contractor’s records.] The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Contractor; provided, however, that if this Agreement is terminated for any reason prior to completion of the Project and if under such circumstances City uses, or engages the services of and directs another Contractor to use, the Work Product, City agrees to hold Contractor harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Contractor, or anyone for whose acts it is responsible, in preparation of the Work Product.

Contractor will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

5. Independent Contractor Status. Contractor, its officers, employees, subContractors, subcontractors, agents and volunteers (collectively hereinafter the “Contractor”), will perform the services in Contractor's own way and pursuant to this Agreement as an independent contractor and in pursuit of Contractor's independent calling, and not as an employee of City. The persons used by Contractor to provide the services under this Agreement will not be considered employees of City for any purposes. Neither the City nor any of its officers, employees, agents or volunteers shall have any control over the conduct of the Contractor, except as expressly set forth in this Agreement. Contractor expressly warrants that while engaged in carrying out and complying with any terms and conditions of this Agreement that Contractor shall not at any time or in any manner, represent that Contractor is in any manner officers, employees, agents or volunteers of the City. Contractor shall obtain no rights to retirement, health care or any other Service Agreement
ZORRO LANDSCAPE INC.

Page 4 ends

4 | P a g e
benefit that accrue to City officials, officers, or employees. Contractor expressly waives any claim to such rights.

The payment made to Contractor pursuant to the Agreement will be the full and complete compensation to which Contractor is entitled. City will not make any federal or state tax withholdings on behalf of Contractor or its agents, employees or subcontractors. City will not pay any workers' compensation insurance, retirement contributions or unemployment contributions on behalf of Contractor or its employees or subcontractors. Contractor agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers' compensation payment which City may be required to make on behalf of Contractor or any agent, employee, or contractor of Contractor for work done under this Agreement. At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Contractor.

6. Successors, Assignment and Delegation. City and the Contractor each binds themselves, their partners, successors, assigns and legal representatives to the other hereto and to partners, successors, assigns and legal representatives of such other party in respect to all covenants, agreements and obligations contained in this Agreement.

The expertise and experience of Contractor are material considerations for this Agreement. Contractor shall not assign or transfer any interest in this Agreement or the performance of any of Contractor’s obligations under this Agreement without the prior written consent of the City. Any attempted assignment or transfer of any of Contractor’s rights, duties or obligations arising under this Agreement shall be null and void.

7. Nondiscriminatory Employment Practices. During the performance of this Agreement, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, sex, creed, color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief in accordance with requirements of City, State or Federal laws and regulations. Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, sex, creed, color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief in accordance with requirements of City, State or Federal laws and regulations. Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoffs or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

The Contractor agrees to post in conspicuous places, available to employees, applicants and subcontractors for employment, notices setting forth the provisions of this non-discrimination clause.

In the event of the Contractor’s non-compliance with the non-discrimination clause of this Agreement, this Agreement may be immediately canceled, terminated or suspended in whole or in part.

8. Subcontracting. Contractor's services are unique and personal. Except as may be specified in Contractor’s Proposal and agreed to by the City, Contractor will not subcontract any portion of the services without prior written approval of City Manager or his/her designee. If Contractor subcontracts any of the services, Contractor will be fully responsible to City for the Service Agreement
ZORRO LANDSCAPE INC.

Page 5 ends

5 | P a g e
acts, errors and omissions of Contractor's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Contractor is for the acts and omissions of persons directly employed by Contractor. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Contractor and City. Contractor will be responsible for payment of subcontractors. Contractor will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Contractor's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

9. Other Contractors. The City reserves the right to employ other Contractors in connection with the services.

10. Indemnification. Contractor shall indemnify and save harmless the City, its officials, officers, employees, agents and volunteers (collectively hereinafter the “City”), against any and all damages to property or injuries to or death of any person or persons, including property and employees or agents of the City and shall indemnify and save the City from any and all liability and expense including reimbursement of reasonable defense costs and legal fees, and claims, demands, suits, actions or proceedings of any kind or nature, including Workers’ Compensation claims, of or by anyone whomsoever to the extent resulting from or arising out of the negligent, reckless or willful misconduct for the Contractor, its officers, employees, subContractors, subcontractors or agents in the performance of the duties undertaken by Contractor pursuant to this Agreement.

This indemnification and hold harmless obligation does not extend to claims arising out of the negligence or willful misconduct of the City.

11. Insurance. Without limiting the Contractor’s indemnification of the City, Contractor shall obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the services by Contractor or Contractor’s agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. Such evidence shall specifically identify this Agreement and shall contain express conditions that the City is to be given written notice at least thirty (30) days in advance of any termination or implementation of a reduction of limits or material change of insurance coverage as specified herein. Failure on the part of the Contractor to procure or maintain insurance shall constitute a material breach upon which the City may immediately terminate this Agreement. All insurance required hereunder shall be primary with respect to any insurance maintained by the City.

Coverages and Limits. Contractor will maintain the types of coverages and minimum limits indicated below, unless the Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Contractor's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Contractor pursuant to this Agreement are adequate to protect Contractor. The coverage will contain no special limitations on the scope of its protection to the below-indicated insureds except for Workers’ Compensation and errors and omissions insurance. Contractor will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Contractor believes that any required insurance coverage is inadequate, Service Agreement
ZORRO LANDSCAPE INC.

Page 6 ends

6 | P a g e
Contractor will obtain such additional insurance coverage, as Contractor deems adequate, at Contractor's sole expense.

11.1 Commercial General Liability Insurance. $1,000,000 combined singlelimit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

11.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

11.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Contractor has no employees and provides, to City's satisfaction, a declaration stating this.

11.4 Professional Liability. Errors and omissions liability appropriate to Contractor’s profession with limits of not less than $1,000,000 per claim. The coverage shall also provide an extended two (2) year reporting period commencing upon termination or cancellation of this Agreement.

Endorsements. For Commercial General Liability Insurance and Automobile Liability Insurance, Contractor will ensure that the policies are endorsed to name the City of Compton and its respective elected and appointed officers, officials, employees, agents and volunteers as “additional insureds” with respect to liability arising out of the activities of the Contractor. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City. Prior to City's execution of this Agreement, Contractor will furnish certificates of insurance and endorsements to City.

Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of City.

12. Permits and Licenses. Contractor, at its own expense, during the term of this Agreement, shall obtain and maintain all appropriate business and professional permits, licenses and certificates that may be required in connection with the performance of services by the Contractor. Upon execution of this Agreement, the Contractor shall show evidence of a business license permit in conformance with Section 9-1.2 of the Compton Municipal Code.

13. Maintenance of Records. Contractor will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Contractor will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement.

Contractor shall maintain all records and will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period and to the extent required by laws relating to audits of public agencies and their expenditures, from the date of final payment under this Agreement.

Service Agreement
ZORRO LANDSCAPE INC.

Page 7 ends

7 | P a g e

14. Warranties. Contractor represents and warrants (i) that Contractor has no obligations, legal or otherwise, inconsistent with the terms of this Agreement or with Contractor’s undertaking this relationship with City, (ii) that the performance of the services called for by this Agreement do not and will not violate any applicable law, rule or regulation or any proprietary or other right of any third party, (iii) that Contractor will not use in the performance of his responsibilities under this Agreement any confidential information or trade secrets of any other person or entity and (iv) that Contractor has not knowingly entered into or will enter into any agreement (whether oral or written) in conflict with this Agreement.

15. Federal and State Withholding Taxes. Contractor shall be responsible for paying when due all federal and state income withholding taxes for all earning under this Agreement.

Contractor agrees to indemnify City for any claims, costs, losses, fees, penalties, interest, or damages suffered by City resulting from Contractor’s failure to comply with this provision.

16. General Compliance with Laws. Contractor will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Contractor, or in any way affect the performance of the services by Contractor. Contractor will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the services with all applicable laws, ordinances and regulations.

17. Termination. In the event of the Contractor's failure to prosecute, deliver, or perform the services, after giving written notice of default and two (2) days to correct the same, then, in addition to any other remedies, City may terminate this Agreement for nonperformance by notifying Contractor in writing. Contractor has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Contractor has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Contractor, whether located at the project site, at Contractor's place of business, or at the offices of a subContractor.

The City’s obligation is payable only from funds appropriated for the purpose of this Agreement. All funds for payments after the end of the current fiscal year are subject to the City’s legislative appropriation for this purpose. In the event this Agreement extends into succeeding fiscal year periods and the City Council does not allocate sufficient funds for the next succeeding fiscal year payments, this Agreement shall terminate immediately upon written notice from the City.

Either Party, upon tendering fifteen (15) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Contractor will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Contractor will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

18. Covenants Against Contingent Fees. Contractor warrants that Contractor has not employed or retained any company or person, other than a bona fide employee working for Service Agreement
ZORRO LANDSCAPE INC.

Page 8 ends

8 | P a g e
Contractor, to solicit or secure this Agreement, and that Contractor has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

19. Claims and Lawsuits. By signing this Agreement, Contractor agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation.

Contractor acknowledges that if a false claim is submitted to City by Contractor, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claim Act, applies to this Agreement and provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney’s fees.

Contractor acknowledges that the filing of a false claim may subject Contractor to an administrative proceeding as a result of which Contractor may be prevented to act as a Contractor on any public work or improvement for a period of up to five (5) years. Contractor acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement.

20. Certifications. The Contractor, under penalty of perjury, certifies that, except as noted below, he/she or any other person association therewith in the capacity of owner, partner, director, officer, manager;
 Is not currently under supervision, voluntary exclusion, or determination of ineligibility by any Federal, State or local agency;
 Has not been suspended, voluntarily excluded or determined ineligible by any Federal, State or local agency within the past 3 years;
 Has not been indicted, convicted or had a civil judgment rendered against he/she/it by a court of competent jurisdiction in any matter involving fraud or official misconduct in connection with obtaining , attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property within the past 3 years.
 Are not presently indicted or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in the preceding paragraph; and
 Have not had one or more public transactions (Federal, State or local) terminated for cause or default within in the past 3 years.

If there are any exceptions to this certification, inset the exceptions in the following space. [Supply exceptions on separate page]
Service Agreement
ZORRO LANDSCAPE INC.

Page 9 ends

9 | P a g e
For any exception noted above, indicate below to whom it applies, initiating agency and dates of action.
[Attach separate page]
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction. The above certifications are part of this contract. Signing this agreement on the signature portion thereof shall also constitute signature of the above certifications.
_________________________ _______________
Sergio Sandoval (Date)
Owner

21. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Los Angeles, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This agreement will be governed by the laws of the State of California.

22. Testimony. Contractor will testify at City's request if litigation is brought against City in connection with Contractor's services under this agreement. Unless the action is brought by Contractor, or is based upon Contractor's actual or alleged negligence or other wrongdoing, City, upon prior written agreement with Contractor will compensate Contractor for time spent in preparation for testimony, testimony, and travel at Contractor's standard hourly rates at the time of actual testimony.

23. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

24. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Agreement.

25. Severability. If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

Service Agreement
ZORRO LANDSCAPE INC.

Page 10 ends

10 | P a g e

26. Amendments. This Agreement may be modified or amended only be written document executed by both Contractor and City’s City Manager and approved as to form by the City Attorney. Such document shall expressly state that it is intended by the parties to amend the terms and conditions of this Agreement.

27. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Contractor in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Contractor will not make any of these documents or information available to any individual or organization not employed by the Contractor or the City without the written consent of the City before any such release.

28. Entire Agreement. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to non-material amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

29. Notices. Any notices required or permitted under this Agreement shall be effective when delivered in person; and effective one (1) business day after delivery by facsimile transmission; and effective five (5) days after mailing by U.S. Mail, postage prepaid and properly addressed as follows:

TO CONTRACTOR: ZORRO LANDSCAPE, INC.

Sergio Sandoval, Owner
10509 Angell Street
Norwalk, CA 90650
562-618-5940
TO CITY: CITY OF COMPTON
205 South Willowbrook Avenue
Compton, California 90220
Attn: General Manager, Water Department
(310) 605-5555
With Copy to: CITY OF COMPTON
205 South Willowbrook Avenue
Compton, California 90220
Attn: City Manager

30. Miscellaneous. No provision of this Agreement is to be interpreted for or against either party because that party or that party’s legal representative drafted such provision.

Should either party hereto, or any representative, successor or assign of either party hereto, resort to litigation to enforce the provisions of this Agreement, the party or parties prevailing in such litigation shall be entitled, in addition to such other relief as may be granted, to recover its or their reasonable attorney’s fees and costs in such litigation from the party or parties Service Agreement
ZORRO LANDSCAPE INC.

Page 11 ends

11 | P a g e
against whom enforcement is sought.

IN WITNESS WHEREOF, CONTRACTOR has executed this Agreement, and the CITY, by its City Manager, who is authorized to do so, has executed this Agreement.

ZORRO LANDSCAPE, INC.

Dated: _______________ By ___________________________________ Sergio Sandoval, Owner

CITY OF COMPTON
Recommended for Approval:

By __________________________________ Dated: ______________ Jose Garfias, Interim General Manager
Water Department
Approved by:

Dated: _______________ By _________________________________ Willie A. Hopkins, Jr., City Manager
Service Agreement
ZORRO LANDSCAPE INC.

Page 12 ends

12 | P a g e
Approved as to form:

By _________________________________ Dated: ______________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: _______________ By __________________________________ Vernell McDaniel, City Clerk