LOCAL STREETS AND ROADS
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 ENG-27-029 Arterials & Collectors Pavement
Maintenance
The project focused on installing preventative maintenance treatments on arterial and collector streets citywide. These treatments include slurry seal, cape seal, and other preventive maintenance treatments, chosen based on the specific conditions in each area.

Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
200,000$ 600,000$ - - - ENG-27-030 Arterials & Collectors Pavement
Rehab
The project focused on installing pavement rehabilitation treatments on arterial and collector streets citywide. These treatments include mill-and-fill, overlays, cold-in-place recycling (CIR), full-depth recycling (FDR), and other pavement rehabilitation treatments, chosen based on the specific conditions in each area. Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
200,000$ 600,000$ - - - ENG-27-031 Zone 5 Residential Pavement Project
The project focused on installing preventative maintenance treatments on residential streets within Zone 5. These treatments include slurry seal, cape seal, and other preventive maintenance treatments, chosen based on the specific conditions in each area. Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
- 600,000$ 4,400,000$ - - ENG-27-032 Citywide Residential Pavement Rehab
The project focused on installing rehabilitation treatments on residential streets citywide.

These treatments include base repairs, mill-and-fill, and other pavement rehabilitation methods, chosen based on the specific conditions in each area. Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
- 400,000$ 1,300,000$ - - ENG-27-033 Arterials & Collectors Pavement
Maintenance
The project focused on installing preventative maintenance treatments on arterial and collector streets citywide. These treatments include slurry seal, cape seal, and other preventive maintenance treatments, chosen based on the specific conditions in each area.

Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
- 200,000$ 600,000$ - - ENG-27-034 Arterials & Collectors Pavement
Rehab
The project focused on installing pavement rehabilitation treatments on arterial and collector streets citywide. These treatments include mill-and-fill, overlays, cold-in-place recycling (CIR), full-depth recycling (FDR), and other pavement rehabilitation treatments, chosen based on the specific conditions in each area. Curb ramps will be upgraded as required by the Americans with Disabilities Act.

TIP-Local Streets
and Roads
- 200,000$ 600,000$ - - TRA-27-013 Traffic Management Center
Equipment and Furniture
Design and install Traffic Management Center facility floor plan layout to include furniture, electrical receptacles, ethernet drops, equipment racks, TMC room power and communication bandwidth demand, video display, communication cable routing, Video wall management system, software, and respective recurring O&M and annual license fees TIP-Traffic Signals
200,000$ - - - - TRA-27-015 Transportation and Streetlight Asset
Update and Replacement
Fund transportation assets update and replacement on 10 year cycle. These assets include but not limited to -

1. Rectangular Rapid Flashing Beacon

2. Radar Feedback Sign

3. Pedestrian Pushbutton and APS

4. Bluetooth Devices for Cut-Through Traffic Analysis

5. Streetlight Smart Controllers

6. PTZ Camera

7. Video Camera's at Signals (non-detection)

8. Blank-Out Signs

9. Blinking Stop Signs

10. Covert speed and volume collection devices
TIP-Traffic Signals
- 100,000$ 100,000$ 100,000$ 100,000$

Page 5 of 6 ends
Page 151 of 217 ends

LOCAL STREETS AND ROADS
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 TRA-27-017 Kirker Pass Ro ad Safety Project
This is currently in design and may need to go to construction. This project is following up on the Kirker Pass Safety Analysis prepared by a consultant in April 2024 to review and assess road safety related information specific to the placement of an overhead sign support along Kirker Pass Road.

TIP-Local Streets
and Roads
290,000$ - - - - TRA-27-019 Monument Blvd Trails-to-Transit
Project
Perpare preliminary design document for the Monument Boulevard Trails-to-Transit project.

This project will implement a 1.6-mile Class I Shared Use Path on Monument Boulevard. This project includes a sidewalk-level Class I facility running along the south side of Monument Boulevard. This project will connect to the Iron Horse Trail regional trail system in the west and to an existing Class I shared-use path on Monument Boulevard to the east, which leads to the Concord BART station. The project will include intersection safety improvements at all cross-streets and driveway crossings, including dedicated bike crossing treatments at Mohr Lane, Carey Drive, Reganti Drive, Detroit Avenue, and Walters Way.

TIP-Local Streets
and Roads
- 50,000$ 5,000,000$ 25,000,000$ - TRA-30-003 Pine Hollow Complete Street Project
The project will construct pedestrian and bicycle improvements that are the most needed active transportation facilities along the two miles of Pine Hollow Road and Alberta Way in the Cities of Concord and Clayton. A complete streets feasibility study was conducted in 2022 to identify pedestrian and bicycle improvements along the 2.2 mile segment of Pine Hollow Road and Alberta Way from Clayton Valley Charter High School to Mount Diablo Elementary School. The study recommends a package of milti-modal and operational strategies to improve bicycle and pedestrian safety, transit connection, and circulation improvements.

Grant funding will be pursued to design and construct the recommended improvements.

TIP-Local Streets
and Roads
- - - - 30,000,000$ TRA-29-001 HSIP Cycle 13 Various citywide safety projects TIP-Local Streets
and Roads 0 0 15,000,000 0 0
TOTAL 16,049,781$ 11,210,000$ 36,140,000$ 26,720,000$ 30,560,000$

Page 6 of 6 ends
Page 152 of 217 ends

SANITARY SEWER and STORMWATER
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 2208 Citywide Sewer Condition Assessment
Study
Analyze sewer mains in cities of Clayton and Concord for hydraulic capacity and structural defects to develop a Condition Assessment Prioritization list for repairs and rehabilitation.

CIP-Sewer and
Sanitation 155,000$ 160,000$ 165,000$ 170,000$ 175,000$ 2209 Sewer Capital Facility Replacement -

HOLDING ACCOUNT
This project is a holding account to fund sewer maintenance and rehabilitation projects identified by the Condition Assessment Prioritization list and other sewer repair needs.

CIP-Sewer and
Sanitation 2,000,000$ 1,500,000$ 500,000$ 500,000$ 500,000$ 2244 Citywide Sewer Main and Lateral
Repair Program
Annual construction to repair and replace sanitary sewer mains and City-owned sewer laterals.

CIP-Sewer and
Sanitation 350,000$ 350,000$ 350,000$ 350,000$ 400,000$ 2515 Iron Horse Park GI
This project will construct 9,000 square feet of bioretention area at an existing 24-inch storm drainpipe in order to treat runoff from five acres of existing impervious public roadway and sidewalks. The existing storm drain will be redirected to the bioretention area for treatment prior to flowing to the existing creek outfall. The existing irrigated grass turf within the bioretention footprint will be replaced with drought-tolerant native plantings. Similarly, irrigated grass turf adjacent to the regional trail and in areas of low activity within the park will be replaced with low-water use native plantings to more closely match the naturalized creek planting along the Regional Trail. Interpretive signage explaining the benefits provided by green infrastructure and associated landscaping. Extension of public sidewalk along Solano Wy to improve pedestrian mobility, the existing pathway connecting the two routes is pedestrian focused and improving the connections at each end of the connecting path will ease the maneuvering and encourage use of the park by cyclists. The park is located close to multiple trail connections, so wayfinding and informational signs are proposed, as well as a water station for cyclists.

CIP-Drainage and
Stormwater
- 800,000$ - - - 2518 Civic Center Greening
The Civic Center Greening Project will consist of stormwater green infrastructure reconstruction throughout the Civic Center campus. The project will address current drainage issues, comply with MRP 3.0 Provision C.3 requirements, reduce impervious pavements, and renovate outdoor amenity areas.

Stormwater Green Infrastructure Reconstruction including three parking lots (Salvio St and Willow Pass Rd), City Buildings (Wings A, C, D, G, and Council Chamber), Corner Parcel (Willow Pass Rd/Parkside Dr), and County Library.

CIP-Drainage and
Stormwater
- - 2,900,000$ - - 2705 Citywide Sewer Condition Assessment
Program
The program will use CCTV technology to inspect sewer lines in specific neighborhoods or streets, evaluate their condition, design appropriate repairs, and execute construction before the scheduled paving.

By adopting this programmatic approach to Sewer Condition Assessment and repair, the aim is to minimize long-term construction disruptions in affected neighborhood areas, coordinate sewer and paving projects effectively, and ensure a comprehensive assessment of the entire City’s sewer system.

This program will mainly address spot repairs to clear debris/roots, sewer breaks, deep cleaning, and general pipe material upgrades related to aging infrastructure, increasing the effectiveness and longevity of the system.

CIP-Sewer and
Sanitation
2,060,000$ 1,061,000$ 1,093,000$ 1,126,000$ 1,195,000$ ENG-27-001 Zone 5 Sewer Replacement
This project will perform replace aging sewer pipes in areas identified in Zone 5. PJ 2208 will be used to CCTV City of Concord sewers and Staff will determine the necessary Zone 5 projects based on the inspection reports. This project will include Design and Construction of pipes in need of replacement in Zone 5.

CIP-Sewer and
Sanitation
250,000$ 2,500,000$ - - - ENG-27-002 Zone 4 Sewer Replacement
This project will replace aging sewer pipes in areas identified in Zone 4. PJ 2208 will be used to CCTV City of Concord sewers and Staff will determine the necessary Zone 4 projects based on the inspection reports. This project will include Design and Construction of pipes in need of replacement in Zone 4.

CIP-Sewer and
Sanitation
- 258,000$ 2,580,000$ - -

Page 1 of 2 ends
Page 153 of 217 ends

SANITARY SEWER and STORMWATER
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 ENG-27-003 Zone 1 Sewer Replacement
This project will perform replace aging sewer pipes in areas identified in Zone 1. PJ 2208 will be used to CCTV City of Concord sewers and Staff will determine the necessary Zone 1 projects based on the inspection reports. This project will include Design and Construction of pipes in need of replacement in Zone 1.

CIP-Sewer and
Sanitation
- - 266,000$ 2,660,000$ - ENG-27-004 Zone 3 Sewer Replacement
This project will replace aging sewer pipes in areas identified in Zone 3. PJ 2208 will be used to CCTV City of Concord sewers and Staff will determine the necessary Zone 3 projects based on the inspection reports. This project will include Design and Construction of pipes in need of replacement in Zone 3.

CIP-Sewer and
Sanitation
- - - 274,000$ 2,740,000$ ENG-27-005 Zone 2 Sewer Replacement
This project will replace aging sewer pipes in areas identified in Zone 2. PJ 2208 will be used for CCTV City of Concord sewers, and Staff will determine the necessary Zone 2 projects based on the inspection reports. This project will include the Design and Construction of pipes requiring replacement in Zone 2.

CIP-Sewer and
Sanitation
- - - - 282,000$ ENG-27-006 Zone 5 Sewer Replacement
This project will replace aging sewer pipes in areas identified in Zone 5. PJ 2208 will be used to monitor the CCTV City of Concord sewers, and Staff will determine the necessary Zone 5 projects based on the inspection reports. This project will include the Design and construction of replacement pipes in Zone 5. This project will restart the sewer maintenance rotational program after completing the first iteration of Zone 5 construction in 2028.

CIP-Sewer and
Sanitation
- - - - - ENG-27-011 Treat Blvd Green Infrastructure
Project
Green Infrastructure Project on Treat Blvd, adding bioretention, new planting, a sidewalk, and a small parking lot at the city-owned lot at Treat Blvd/Pembroke Drive.

CIP-Drainage and
Stormwater 120,000$ 1,080,000$ - - - TOTAL 4,935,000$ 7,709,000$ 7,854,000$ 5,080,000$ 5,292,000$

Page 2 of 2 ends
Page 154 of 217 ends

BUILDINGS, PARKS, RECREATION
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31

CONTINUING PROJECTS
2241 Citywide Infrastructure Grant This project includes funds to be used to prepare grant applications, coordinate grant reporting, invoicing, initial studies, and etc., for future CIP projects. CIP-Miscellaneous - - 100,000$ 100,000$ 100,000$ 2257 General Plan Update - HOLDING

ACCOUNT
This project will provide an update to the City's General Plan. This process is initiated approximately every 10 years. The next comprehensive General Plan update is anticipated to start in 2026 or 2027.

CIP-Miscellaneous
700,000$ 700,000$ 700,000$ 700,000$ 700,000$ 2409
Concord Pavilion - City Capital
Expenditure Contribution
Requirement
This project sets aside funds for the City portion of capital expenditures related to the Concord Pavilion facility. On December 10, 2013 the City Council approved a management agreement with Live Nation Worldwide for the Concord Pavilion, with an initial 10-year term and option of a five-year extension to lease, operate, maintain, promote and manage the Concord Pavilion. The agreement outlines a shared capital expenditure contribution requirement. The agreement requires the City to contribute $100,000 calendar year 2014, increasing by 2% each year. $129,360.66 added to FY26-27 and $131,947.88 added to FY27-

28. CIP - Building and
Grounds
129,361$ 131,948$ - - - 2478 Golf Course Maintenance and Safety
Needs
This project allocates funds to address important maintenance and safety needs at Diablo Creek Golf Course.

CIP - Building and
Grounds 100,000$ 100,000$ - - - 2479 Police Department Headquarters
Roofing
This project will repair the roof on the Police Department Building. The flat portions of the Police Department Headquarters roof have reached end-of-life. The building experiences chronic leaking that will eventually result in damage to the building interior if left unattended.

CIP-Building and
Grounds
- - - - - 2553 Police Department HVAC Chiller
The chillers on the Police Department's roof are 20 years old and have reached the end of their useful life. This project will replace this critical part of the HVAC system and increase energy efficiency
CIP-Building and
Grounds - - - - - 2571 Police Department Air Handlers
Replacement
Replace all four air handlers at the police department with new energy efficient units. This will also require some building automation software updates.

CIP-Building and
Grounds - - - - - 2592 Bldg Maintenance - Holding Account
This holding account will fund preventive building maintenance, replacement, and rehabilitation projects. Maintenance performed at the appropriate time will maintain the appearance and usefulness of facilities and will be most cost-effective.

CIP-Building and
Grounds
- - - - - 2627 Council Chambers ADA Upgrades
This project will renovate the dais of the City Council Chambers to be Americans with Disabilities Act (ADA) compliant. Improvements may include shifting the dais forward and constructing a ramp behind the dais. Several design alternatives will be explored including a full redesign on the Council Chamber layout, with final decision on design to be made when funding is available.

CIP-Building and
Grounds
- - 800,000$ - - 2644 Willow Pass Recreation Center Interior
Modernization
This project will revitalize and modernize the interior of the Willow Pass Community Center, revitalize and repair men's and women's restroom walls, fixtures and flooring, replace fixtures, cabinets, counter tops, flooring, doors, door frames and window coverings in the main hall, lobby, kitchen, Arts & Crafts room and the Classroom, paint the entire interior, including offices, and add built-in projector screens and other AV equipment.

CIP-Parks and
Recreation
1,100,000$ - - - - 2655 Police Department Headquarters
Exterior Painting
This project will re-paint and re-caulk the exterior of the Police Department Headquarters to protect the synthetic stucco exterior coating on the building. There will also be repairs made to the IFIS coating.

Funding for this project was transferred to the Concord Community Solar Array Repair Project in order to facilitate expedited repair. Funds will be returned to this project at a later Capital Budget Cycle.

CIP-Building and
Grounds
- - - - - 2746 PD Boiler Replacement This project will replace two boilers in the PD Building. CIP-Building and Grounds - - - - -

Page 1 of 5 ends
Page 155 of 217 ends

BUILDINGS, PARKS, RECREATION
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 2747 PD Chilled Water Circulations Upgrade and replace two chilled water circulation systems in the Police Department. CIP-Building and Grounds - - - - - 2748 PD HVAC VAV & Fan Coils PM and
Replacement
This project will perform preventative maintenance at the Police Department Building and replace the HVAC VAVs (Variable Air Volume - airflow and temperature regulation) & Fan Coils PM and Replacement.

CIP-Building and
Grounds - - - - - 2754 Citywide Median Maintenance and
Refurbishment
This project will address City-wide medians that require refurbishment and renovation.

Irrigation and vegetation will be repaired.

CIP-Parks and
Recreation - 750,000$ 1,000,000$ - - 2755 Citywide Tree Planting & Replacement This project will address sites of previously removed trees and empty planting spaces currently known throughout the City.

CIP-Parks and
Recreation 100,000$ 100,000$ 175,000$ 175,000$ 175,000$ 2757 Citywide Park Recreation Asset
Replacement Program
This is an on-going replacement program. The City has multiple Park and Recreation assets throughout the Parks that are in need of updating and replacement. This includes replacing picnic tables, water fountains, and other assets.

CIP-Parks and
Recreation - - 75,000$ 75,000$ 75,000$ 2758 Playground Replacements
This project will replace and upgrade several City Park Playground assets. Several playgrounds are currently in disrepair. Replacement and repair of these playgrounds will be required in the near future.

CIP-Parks and
Recreation 250,000$ 400,000$ 800,000$ 800,000$ 800,000$ 2759 Ellis Lake Park Restoration This project will provide restoration of the banks, infrastructure, and irrigation system at Ellis Lake Park.

CIP-Parks and
Recreation - - 500,000$ 500,000$ - 2765 Don Fernando Pacheco Adobe
Restoration
This project will restore the Adobe based on the Core Historic Structure Report's (2023) recommendations. Restoration of the Don Fernando Pacheco Adobe structure to meet current building codes including replacement of the wood shingle gable roof.

The Contra Costa County Horseman’s Association leased the Adobe until 2019. The building is currently unoccupied.

The site was listed on the National Register of Historic Places (NRHP) in 1980 at the local level of significance for its architecture and for its association with important events in the growth and settlement of the Concord and the Contra Costa County region.

CIP-Building and
Grounds
2,000,000$ - - - - 2767 Centre Concord Restroom and Lighting
Modernization
The main restrooms and lighting at Centre Concord are in need of modernization. Current materials and fixtures are dated and in poor condition. Restrooms improvements include replacing floors and wall tiles, removing wallpaper, and replacing vanities and fixtures.

Lighting throughout the lobby and adjoining hallway would be replaced with new fixtures.

CIP-Building and
Grounds
- - 190,000$ - - 2768 Centre Concord Exterior Beautification
Centre Concord, which houses the City's preschool program, staff offices, and the City's largest rental space, requires an exterior update. Because the building is unattractive and dated, it does not present well to potential renters and visitors. Beautification could include exterior painting, roof fascia repair, and deep cleaning of roof tiles. Additionally, because the building is located in the back of a parking lot, it can be difficult for customers to locate, and improved wayfinding would be beneficial.

CIP-Building and
Grounds
- - 160,000$ - - 2774 Willow Pass Community Center Court
Yard and Patio Refurbishment
Modernize both patios, replace the entire concrete from the Courtyard and Patio, add extra seating, update spaces, and remove warn-out rubber padding from the back patio. Add new flooring with updated cement designs and decorative walls to cover up metal fencing in the Courtyard. Replace and raise existing exterior walls in the patio next to the sunroom with updated walls for aesthetics and safety. Replace them with updated flooring as well.

CIP-Building and
Grounds
100,000$ - - - - 2778
Camp Concord Dining Hall
Improvements & Equipment
Replacement
Interior improvement to the Dining Hall building including structural, kitchen cabinets, storage, windows, paneling, shutters, and flooring.

CIP-Building and
Grounds 1,000,000$ - - - -

Page 2 of 5 ends
Page 156 of 217 ends

BUILDINGS, PARKS, RECREATION
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 2794 Concord Community Pool - Boiler
Replacement
The four (4) aging boilers at the pool will be replaced with high-efficiency models to improve energy performance, reduce maintenance, and ensure reliable heating. Installation will be scheduled to minimize disruption to pool operation.

CIP-Building and
Grounds 580,000$ - - - -

NEW PROJECTS
ENG-27-026 Civic Center Roof HVAC Replacement
Project
Replace and update all HVAC on Civic Center Roof (Wings A, C & D) to meet current CA Building Code standards. Re-route condensate drains from HVAC; replace all existing HVAC units; and replace mechanical, plumbing, gas, and electrical conduits. Replace all ductwork on Wing A & Wing D, and provide a complete air balancing report for all Wings.

Related to PJ 2429 Civic Center Roof Replacement (see conditions noted on previous building permit). Note: Only Wing C has new ductwork.

CIP-Building and
Grounds
- - 200,000$ 2,850,000$ - ENG-27-035 CDD Wing D Space Planning and
Interior Upgrades
Interior design and space planning to support additional staff positions in Housing and Engineering approved during 2025-2026 operating budget. Includes design, furniture, minor interior remodel.

CIP-Building and
Grounds 500,000$ - - - - PW-27-003 Kidango Baldwin Park Roof
Replacement Roof replacement at Kindango CIP-Building and Grounds - - 550,000$ - - PW-27-005 Willow Pass Park Pixie Playland Well
Pump Upgrades Pump equipment needs to be upgraded. CIP-Building and Grounds 220,000$ - - - - PW-27-008 Parks Renovations Park renovations for turf and plant replacement, irrigation, park service and storage areas, and park fencing and gates.

CIP-Parks and
Recreation 150,000$ - 750,000$ 750,000$ 750,000$ PW-27-009 Parks Pathways Resurfacing Repair, replace, install asphalt pathways in parks where existing sidewalks, decomposed granite paths, and gravel paths are currently installed.

CIP-Parks and
Recreation - - 375,000$ 375,000$ - PW-27-010 Park Well Evaluation Hire consultant to inspect, test, and evaluate all City of Concord wells and ponds. Draft maintenance plan for wells. Seed funding to implement recommendations.

CIP-Parks and
Recreation - - 220,000$ - - PW-27-011 Downtown District Tree Lighting Remove and replace all street tree lights in and around Todos Santos Plaza for beautification of the Downtown District.

CIP-Parks and
Recreation 100,000$ 40,000$ 40,000$ 40,000$ 40,000$ PW-27-014 Fleet Garage Facility Enhancements
The Fleet Garage Facility Enhancement Project includes replacement of approximately 50 high- bay light fixtures with energy-efficient LED lighting (20,000 lux ), a full interior repainting of the 11,880 sq. ft. facility, and the installation of a reflective roof coating to extend roof life and reduce heat. The project scope includes necessary design work for lighting layout and roof coating specifications, and accounts for staff time and contingency. The project supports energy efficiency, worker safety, and long-term facility preservation, and may qualify for utility rebates or State energy grants.

CIP-Building and
Grounds
360,000$ - - - - PW-27-015 Senior Center Solar and Electric Energy
Storage
Provide an energy storage solution to ensure emergency preparedness at the Senior Center consisting of a micro-grid solar system
CIP-Building and
Grounds 250,000$ 750,000$ - - -

Page 3 of 5 ends
Page 157 of 217 ends

BUILDINGS, PARKS, RECREATION
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 PW-27-016
Emergency Operations Center / Police
Department Roofing and Mechanical
Systems Replacement
This project incorporates 7 interrelated projects at the Police Departemnt Headquarters building into a single capital project. The following continuing and new projects are included. *PJ2479 PD HQ Roof Replacement: This project will repair the roof on the Police Department Building. The flat portions of the Police Department Headquarters roof have reached end-of- life. The building experiences chronic leaking that will eventually result in damage to the building interior if left unattended.
*2553 PD Chiller Replacement: The chillers on the Police Department's roof are 20 years old and have reached the end of their useful life. This project will replace this critical part of the HVAC system and increase energy efficiency.
*2571 PD Air Handler Replacement: Replace all four air handlers at the police department with new energy efficient units. This will also require some building automation software updates.
*2746 PD Boiler Replacement: This project will replace two boilers in the PD Building. *2747 PD Chilled Water Pump Replacement: Upgrade and replace two chilled water circulation systems in the Police Department.
*2748 PD VAV & Fan Coil Replacement: This project will perform preventative maintenance at the Police Department Building and replace the HVAC VAVs (Variable Air Volume - airflow and temperature regulation) & Fan Coils PM and Replacement. *2655 PD Exerior Paint: This project will re-paint and re-caulk the exterior of the Police Department Headquarters to protect the synthetic stucco exterior coating on the building.

There will also be repairs made to the IFIS coating.

CIP - Building and
Grounds
13,900,000$ 3,500,000$ - - - PW-28-001 PD IT Server CRAC Replacements The Liebert CRAC units in the PD IT server room are subject to replacements. The 8-ton cooling system appears to be about 15 years old at this point.

CIP-Building and
Grounds - 250,000$ - - - PW-28-002 PD Walk-In Freezer Replacement Walk-in freezer panels have deteriorated. CIP-Building and Grounds - 250,000$ - - - PW-28-003 Meadow Homes Spray Park
Renovations Spray Park features and surrounding areas need upgrades and improvements. CIP-Building and Grounds - - 320,000$ - - PW-28-004 PW Corp Yard Building Electrical
Equipment Upgrades
Funding is needed to upgrade the three (3) PW Corp Yard electric switchgears. They include 800 amp unit for Facilities, 600 amp for Parks, and 1,000 amp for Fleet.

CIP-Building and
Grounds 200,000$ - - - - PW-28-009 Repair Parking Garage Walls and
Floors
Visible cracks have been discovered throughout the structure including both floors and walls.

Repairs are need to prevent further deterioration minimizing general liability and safety concerns.

CIP-Building and
Grounds - 400,000$ 400,000$ - - PW-28-010 Concord Childcare Facility Renovation Repairs of Co ncord Childcare facilities of broken grounds facilities. CIP-Building and Grounds - - 350,000$ - - RS-27-001 Replace Senior Center carpet, tile,
moveable walls, window blinds
The Concord Senior Center is now more than 20 years old and in need of essential capital maintenance to ensure safety, functionality, and an inviting environment for the thousands of seniors and community members who use the facility each year. Many of the building’s original interior features have reached the end of their useful life, including flooring throughout the building, moveable walls used to subdivide rooms, and broken window coverings.

CIP-Building and
Grounds
- 225,000$ 400,000$ - -

Page 4 of 5 ends
Page 158 of 217 ends

BUILDINGS, PARKS, RECREATION
Project Short Description Complete Description Project Type FY27 FY 28 FY 29 FY 30 FY 31 RS-27-003
Replace Centre Concord kitchen hall
counters and cabinets and repaint
walls.

Centre Concord cabinets and counters were installed when the community center opened in the early 90’s and are in of replacement. Shelves and cabinets are worn the wood finish is peeling and stained with white material. The counter tops are chipped, peeling and have several stains. The back hall wall has several missing painting spots, stains and marks on the wall.

CIP-Building and
Grounds
- - 75,000$ - - RS-27-004 Update Markham Science Center
restroom and plumbing.

The Markham Nature Park Science Building is utilized during summer programming and throughout the year for seasonal day camps and a contracted preschool program. The facility currently only has one restroom with a single toilet and wash sink that often experiences plumbing issues due to the age of the facility and old underground pipes infested with plant roots. Update facility restroom and plumbing.

CIP-Building and
Grounds
75,000$ - - - - RS-27-006 Replace Pool Inflatable Obstacle
Courses
In 2015, Concord Community Pool purchased Aflex inflatable obstacle courses to enhance the recreational swim program. The addition was a tremendous success, increasing attendance and revenue during recreational swim hours. In recent years, the inflatables have experienced more frequent rips and tears. When damage occurs, the inflatables must be removed from the water to ensure public safety, resulting in potential revenue loss during rec swim hours.

Repairs typically require a contractor and takes time to complete. To ensure continued safety and maintain revenue projections, replacement of the inflatables is needed.

CIP-Parks and
Recreation
50,000$ - - - - TOTAL 21,864,361$ 7,596,948$ 8,180,000$ 6,365,000$ 2,640,000$

Page 5 of 5 ends
Page 159 of 217 ends

490 Measure V
25%
710 Sewer Operating
18%
475 Measure J
(Local+28a)
15%
266 SB1/RMMR
13%
402 Grants
7%
270 Storm
Water Mgmt
3%
223 General Plan
Reimbursement
2%
- All Other Funds
4%
- Financed
12%
FY 2027 - FY 2028
2-Yr Capital Budget Funding Chart
Attachment 5

Page 160 of 217 ends

$.M
$20.M
$40.M
$60.M
$80.M
$100.M
$120.M
$140.M
FY 2017 & 2018 FY 2019 & 2020 FY 2021 & 2022 FY 2023 & 2024 FY 2025 & 2026 FY 2027 & 2028 $32.4M
$41.2M
$31.7M
$121.2M
$83.1M
$58.8M
Historic 2-Yr Capital Budgets
Attachment 6

Page 161 of 217 ends

FUNDING RECOMMENDATION
Emergency Operations Center / Police Department Roof and Mechanical Systems Replacement (PW-27-016) Previously Appropriated funds
Project Description Fund Amount
2479 Police Department Headquarters Roofing 401 500,000 2553 Police Department HVAC Chiller 401 400,000 2571 Police Department Air Handlers Replacement 490 400,000 2746 PD Boiler Replacement 490 200,000 2747 PD Chilled Water Circulations 490 150,000 2748 PD HVAC VAV & Fan Coils PM and Replacement 490 100,000 Total previously appropriated 1,750,000
New Appropriations
Fund Amount
Measure V fund 490 2,500,000
Federal appropriation 402 1,000,000
Total new appropriations from fund balance 3,500,000
Financing
Amount
7,000,000
Total new funding from borrowing options 7,000,000
Budget Transfers (Completed Projects)
Project Description Fund Amount
2608 Pavement Maint - Zones 5C & 5D 490 600,000
2449 Willow Pass Repave & 6th 401/407 900,000
2527 Citywide Arterial/Collector 2 401/407 320,000
2562 Pavement Maint Zone 4 490 47,000
2581 Monument Blvd Pavement Rehab 407 200,000
2582 Meadow Ln/Market St Paving 407 97,000
2606 Pavement Maint Zn 1G & Ayers 407 975,000
2612 Pavement Maint 3I 490 470,000
2622 Pavement Maint Zn 4C 490 580,000
2626 Pavement Maint Zn 2L & PC Hwy 490 270,000
2736 Street Maintenance 1 407 575,000
2641 Lic Plate Reading Cameras 400 400,000
2653 PD Generator & Xfer Switch 490 100,000
2658 Salvio/Colfax Garage Lighting 407 116,000
Total remaining funds from completed projects $5,650,000 Budget Transfers (Continuing Projects)
Project Description Fund Amount
2343 Furniture Fixtures Equip Rsrve 490 400,000
2366 Police Safety Equipment 400 100,000
2688 Todos Santos Fountain Repairs 490 250,000
2744 Ongoing Storm Drain Maint Lini 490 500,000
Total reduced funds from continuing projects $1,250,000 Attachment 7

Page 162 of 217 ends

From: Barone, Valerie <[email protected]> Sent: Tuesday, May 12, 2026 9:21 AM
To: Thompson, Carlton <[email protected]>; McAuley, Wendy <[email protected]>; McAuley, Wendy
<[email protected]>; Ezell, Justin <[email protected]>; Fockler, Joelle <[email protected]>; Davis, Bruce <[email protected]>; Robinson, Monique
<[email protected]>
Subject: Capital Budget Related Questions from the Mayor--Item 6.b This e-mail is being shared with all Councilmembers

Mayor Nakamura,

Yesterday you asked the following capital project related questions. Each is below with a response from staff.

Will funding sources be shared during the PowerPoint presentation for items proposed for funding:

Staff Response: Yes

Is Turtle Creek planned for a repaving?

Staff Response: Turtle Creek is not in the proposed two-year Capital Budget nor in the five-year Capital Infrastructure Plan. Turtle Creek will be evaluated again, as will all roadways, as the five-year roadway investment plan gets updated later this year and its status could change through that process. Please remember that there are more roadways in need of investment than dollars available. Consequently, the City employs critical point investment strategy, and which roadways are selected for investment depends upon a roadway’s scoring through this process. This will be discussed/presented as part of tonight’s presentation on the Capital Budget.

As a reminder: The five-year Capital Investment Plan (CIP) is the two-year capital budget (the focus of tonight’s presentation) and projects proposed to occur in the three following years. The projects in year 3 thru 5 of the CIP are generally not funded (although some show how they could be funded if it is from a known, reliable funding source—like SB 1 or gas tax). Having certain projects in the five-year plan allows staff to pursue grants and Agenda Item No. 6.b
Benched Correspondence
May 12, 2026

Page 163 of 217 ends

assists with future planning but they are not active Capital Projects until funded and placed into a two-year Capital Budget.

Is Pine Hollow planned for a repaving?

Staff Response: Pine Hollow is not in the proposed two-year Capital Budget but is in the five-year Capital Infrastructure Plan as a complete streets project—that will rely on obtaining a grant to occur.

You asked for clarity during tonight’s presentation on what projects are pending, in progress, and/or planned.

Staff Response: During the presentation tonight, staff will present projects in groups, as follows: completed projects, upcoming projects that are already fully funded, new and continuing projects that need more funding. These last two categories make up the two-year Capital Budget that Council will be asked to adopt in June. Planned/partially funded projects outside of the 2-yr Capital Budget, but in the CIP in the out three years will not be presented tonight. These projects are listed in Attachment 4 to the staff report.

Valerie
Valerie Barone, City Manager (she/her/hers)
City of Concord | Website: www.cityofconcord.org
( (925) 671-3150 | * [email protected]
1950 Parkside Drive, MS/01, Concord, CA 94519

Page 164 of 217 ends

FY 2027 & 2028 Capital Budget
Carlton Thompson, City Engineer
Bruce Davis, CIP Manager
May 12, 2026
1

Page 165 of 217 ends

Overview
2 • Capital Budget and CIP Development Process
• Capital Budget Funding Sources
• 5-Year Pavement Maintenance Plan
• Fiscal Year 2026 Accomplishments
• Ongoing funded projects
• Recommended Capital Budget
• Years 3-5 of the 5-Year CIP

Page 166 of 217 ends

Terminology
3 Fiscal Year
• Referred to as “FY” and runs July 1 – June 30 (e.g., FY 2027) Capital Budget
• Includes the approved 2-year list of funded projects
Capital Improvement Plan (CIP)
• Is not a budget, but does forecast future projects and costs • 5-year plan, including the 2-year funded capital budget

Page 167 of 217 ends

Capital Budget/CIP
Development
Process
44

Page 168 of 217 ends

Overview
5 Key Points
• Biennial Budget Cycle
• Focused on Community/Council
Priorities
• Total Recommended Capital Budget
Funding of $58.8M
Challenges
• Funding
• Constrained Construction Market
Development & Approval
• Department & City Staff (Dec 2025)
• Committees & Commissions
• PROSC & Measure V (March 2026)
• Planning Commission (April 2026)
• Council Workshop (May 2026)
• Council Adoption Hearing (June 9,
2026)

Page 169 of 217 ends

6 How does the project
implement one or more
Council Initiatives?
Was the project
previously funded in an
approved Capital
Budget?
Does the project
address failing
infrastructure
necessary to provide
critical public services?
Is the project needed to
satisfy regulatory
compliance issues?
Are their restricted
funds included such as
grants or enterprise
funds?
Does the project
implement any
Complete Street policy
goals?
How does the project
help implement the
City's Climate Action
Plan?
In what ways does the
project conform to
General Plan
Principles?
Has the project been
identified through a
Council approved plan?
Funding
Criteria

Page 170 of 217 ends

Capital Budget
Funding Sources
77

Page 171 of 217 ends

8 All other funds
75% $44.3M
Measure V
25% $14.5M
FY27-FY28 Measure V Funding

Page 172 of 217 ends

SB1, Gas Tax, and Measure J
Road Maintenance Rehabilitation Act (RMRA) – SB1
• Supplemental State Transportation Measure
State Gas Tax
• Funds both Operating and Capital Expenditures
Measure J (Local and 28a)
• Administered through Contra Costa Transportation Authority (CCTA) 9

Page 173 of 217 ends

Enterprise Funds
Sewer Enterprise
• Based on the annual sewer levy
Stormwater Fund
• Based on flat Parcel Tax
Golf Course Enterprise
• Addresses ongoing maintenance investments at Diablo Creek 10

Page 174 of 217 ends

Development Impact Fees/Department Sources
Off-Street Improvement
Program (OSIP)
• Transportation-only fund
Parkland Dedication Fund
• Funding available for both New Parks
and Parks Replacement projects
11 Information Technology
• IT Operating
• PEG Funds
• IT Replacement
Public Works
• Facilities Maintenance
Concord Pavilion Fund
• Per Agreement with Live Nation,
reinvestment required annually

Page 175 of 217 ends

Grant Funding
Grants
• Transportation Development Act (TDA)
• Community Development Block Grant
(CDBG)
• Highway Safety Improvement Program (HSIP)
• Federal Earmarks
12 Partnering Opportunities
• CalTrans
• PG&E
• BART

Page 176 of 217 ends

5-Year Pavement
Maintenance Plan
13

Page 177 of 217 ends

Residential Pavement Neighborhoods
14

Page 178 of 217 ends

Critical Point Management
15 Right treatment,
at the right time,
on the right road

Page 179 of 217 ends

16 3-Year Average Pavement Condition Index (PCI)
50 55
60 65
70 75
80 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Page 180 of 217 ends

5-Year Pavement Maintenance Plan Status
17 • Pavement Technical Assistance Program(PTAP)
• Inspections will begin in late May
• Initial report available in August
• Final report available in October
• I&F Committee review updated 5-year Plan in August
• 5-Year Pavement Maintenance Plan adoptionin the Fall

Page 181 of 217 ends

18 Patch Paving Crew
Status Update
• Equipment and Staffing
complete
• Training began in
February
• Fully Operational in July

Page 182 of 217 ends

Fiscal Year 2026
Accomplishments
19

Page 183 of 217 ends

Willow Pass/Landana Sewer Capacity Improvements
(PJ 2702/2704)
Total Funding: $13.7M
20

Page 184 of 217 ends

21 Willow Pass Road Repaving and Safe Routes
to Transit (PJ 2449)
Total funding $11.3M

Page 185 of 217 ends

Treat Boulevard Phase 2
(PJ 2559)
Total Funding: $16M
22 Before After

Page 186 of 217 ends

Before After
23 Clayton Road Pavement Rehab
(PJ 2609)
Total Funding: $10.2M

Page 187 of 217 ends

24 Clayton Road Traffic Operations
(PJ 2579)
Total Funding: $5.8M

Page 188 of 217 ends

Before After
25 Street Maint Project No. 1 (Bailey Rd)
(PJ 2736)
Total Funding: $2.8M

Page 189 of 217 ends

26 Residential Pavement Maintenance
Total Investment: $36.5M
• Phase C & Concord B
• Phase D
• Phase E & Port Chicago Hwy

Page 190 of 217 ends

Before After
27 Residential Pavement Maintenance – Phase C
(Concord Blvd) (PJ 2606/2618)
Total Funding: $12.2M

Page 191 of 217 ends

Before After
28 Residential Pavement Maintenance – Phase D
(Concord Blvd)(PJ 2612/2614/2622/2625)
Total Funding: $8.8M

Page 192 of 217 ends

Before After
29 Residential Pavement Maintenance – Phase E
(Port Chicago) (PJ 2613/2621)
Total Funding: $15.5M

Page 193 of 217 ends

Public Works Projects
Total Funding: $1.5M
30 • Baldwin Park Preschool Outdoor Enclosure (PJ 2769) • Golf Course Maintenance Building Fire Repair (PJ 2551) • Concord Community Park Solar Array Repair (PJ 2718)
• Fleet Asset & Fuel Management System (PJ 2531)
Facilities Maintenance

Page 194 of 217 ends

Completed ITP Projects
Total Funding: $1.7M
31 • Citywide Electronic Document Management System (PJ 2258) • Point of Sale System Replacement (PJ 2401)
• Broadcast AV for Various Sites (PJ 2416)
• Mobile Data Computer Replacement (PJ 2397)
• Body Worn Cameras (PJ 2487)
• Downtown Security Cameras (PJ 2275)

Page 195 of 217 ends

Ongoing Funded
Projects
32

Page 196 of 217 ends

Monument/Galindo Paving
(PJ 2452)
Total Funding: $7.5M
33 GALINDO ST (2027)MONUMENT BLVD (2026)

Page 197 of 217 ends

Diamond Boulevard Pavement Rehab
(PJ 2727)
Total Funding: $2.6M
34

Page 198 of 217 ends

Residential Paving
Total Funding: $11.2M
35 PHASE F
Residential Pavement
Maint No. 1
Residential Pavement Maint Phase F
(PJ 2528/2611/2624)
• Four neighborhoods
• Summer 2026
Residential Pavement Maint No. 1
(PJ 2741)
• Summer 2026

Page 199 of 217 ends

36 https://www.cityofconcord.org/272/Capital-Improvement-Plan Construction Information

Page 200 of 217 ends

Public Works Projects
Total Funding: $12.1M
37 Facilities Maintenance
• New Transportation Offices and Transportation Management Center at Corp Yard (PJ 2648) • Concord Community Pool: Changing Room/Bulkhead/Shade Structures (PJ 2643/2645/2647) • Concord Parking Garage Elevator Repair (PJ 2763)
• Baldwin Park Dance Studio Bathroom Reconfiguration (PJ 2771) Parks Maintenance
• Newhall Park Dredging (PJ 2353)
• Meadow Homes Restroom Replacement (PJ 2635)
• Camp Concord: Maint Repairs/Elec Undergrounding
(PJ2533/2779)
• City Tree Maintenance (PJ 2753)
• Citywide Tennis Court Maintenance (PJ 2751)

Page 201 of 217 ends

Information Technology Projects
Total Funding: $14.5M
• Citywide Technology Hardware and Software Replacement (PJ 2218) • Enterprise Resource Planning (ERP) System Replacement (PJ 2529) • Lighting and Camera Systems at City Facilities (PJ 2638) • CCTV Public Safety and Crime Prevention Technology Improvements (PJ 2403) • PD Key Card Building Access (PJ 2474)
38

Page 202 of 217 ends

Recommended
Capital Budget
FY 2027 and 2028
39

Page 203 of 217 ends

Capital Budget
Size
40 • Average 2-Yr budget
$35M (2017-2022)
• Peak 2-Yr budget
$121.2M (2023-2024)
• Proposed 2-Yr budget
$58.8 Million

Page 204 of 217 ends

41 Fund Allocations
Total All Sources: $58.8M

Page 205 of 217 ends

• ENG-27-007 Zone 3 Residential Pavement Project
• ENG-27-008 Citywide Residential Pavement Rehab
• ENG-27-027 Zone 2 Residential Pavement Project
• ENG-27-028 Citywide Residential Pavement Rehab
• ENG-27-031 Zone 5 Residential Pavement Project
• ENG-27-032 Citywide Residential Pavement Rehab
42 Residential Pavement Maintenance
Total Funding: $17.8M (SB1, Measure J, Measure V)

Page 206 of 217 ends

43 • 2552 Citywide Paving Maintenance
• 2495 Citywide Street Assessment Study
• ENG-27-009 Arterials & Collectors Maint No.1
• ENG-27-010 Arterials & Collectors Rehab No.1
• ENG-27-029 Arterials & Collectors Maint No. 2
• ENG-27-030 Arterials & Collectors Rehab No. 2
• ENG-27-033 Arterials & Collectors Maint No. 3
• ENG-27-034 Arterials & Collectors Rehab No. 3
Arterials/Collectors Pavement Maintenance
Total Funding: $2.5M (SB1, Measure J, Measure V)

Page 207 of 217 ends

Bicycle & Pedestrian/ADA Accessibility
Total Funding: $2.5M (Measure J, Measure V, Grants)
44 • ENG-27-012 Citywide Accessibility Improvements No. 13 • ENG
-27-013 Citywide Accessibility Improvements No. 14
• ENG-27-017 Concord Blvd Mount Diablo Creek Trail Connection • ENG-27-018 Rocketship/Glenbrook Sidewalk Gap Closure • ENG-27-019 Downtown Sidewalk Repair Project
• ENG-27-021 Sidewalk Maintenance Project No. 1
• ENG-27-025 West Concord Crossing Improvements
• TRA-27-019 Monument Blvd Trails-to-Transit Project

Page 208 of 217 ends

Stormwater Projects
Total Funding: $2M (Stormwater funds)
45 Treat Blvd / Pembrook Dr
• ENG-27-011 Treat Blvd Green Infrastructure Project
• 2515 Iron Horse Park Green Infrastructure

Page 209 of 217 ends

Sewer Projects
Total Funding: $10.6M (Sewer funds)
46 • ENG-27-001 Zone 5 Sewer Replacement
• ENG-27-002 Zone 4 Sewer Replacement
• 2208 Citywide Sewer Condition Assessment Study
• 2209 Sewer Capital Facility Replacement
• 2244 Citywide Sewer Main and Lateral Repair Program • 2705 Citywide Sewer Condition Assessment

Page 210 of 217 ends

Transportation Projects
Total Funding: $2.6M (OSIP , Measure J, Measure V)
• TRA-27-015 Transp and Streetlight Asset Update and Replacement • TRA-27-017 Kirker Pass Road Safety Project
• 2541 Off-Site Street Improvement Program (OSIP) Update • 2783 Adaptive Traffic Control on Major Concord Corridors • 2651 Citywide Traffic Signal LED Replacement
• 2537 Citywide Traffic Monitoring
• 2799 Grant Funded Downtown Parking Implementation
• 2649 Citywide Streetlight Upgrade and Routine Maintenance • 2573 Innovative Transportation Program
• 2539 School Safety Assessment Program
• 2464 Traffic Safety and Traffic Calming Program
• 2577 Transportation Grants Administration (Local Match) 47

Page 211 of 217 ends

EOC/PD Roof and HVAC
Total Funding: $19.1M (Measure V, Grants, General fund, Financing) 48 • PW-27-016 Police Department Roofing and Mechanical Systems Replacement
• 2479 Police Department Headquarters Roofing
• 2748 PD HVAC VAV & Fan Coils PM and Replacements
• 2747 PD Chilled Water Circulations
• 2746 PD Boiler Replacements
• 2553 Police Department HVAC Chiller Replacement
• 2571 Police Department Air Handlers Replacement
• 2655 Police Department Headquarters Exterior Painting

Page 212 of 217 ends

Buildings & Grounds Projects
Total Funding: $7.6M (Measure V, Building Maint, Fleet, IT, Sewer, Grants) • PW-27-005 WP Park Pixie Playland Well Pump
• PW-27-008 Parks Renovations
• PW-27-011 Downtown District Tree Lighting
• ENG-27-035 CDD Wing D Interior Upgrades
• PW-27-014 Fleet Garage Facility Enhancements
• PW-27-015 Senior Center Solar and Energy Storage
• PW-28-001 PD IT Server CRAC Replacements
• PW-28-002 PD Walk-In Freezer Replacement
• PW-28-004 PW Corp Yard Elec Equip Upgrades
• PW-28-009 Repair Parking Garage Walls and Floors
• RS-27-001 Replace Senior Center carpet, tile,
moveable walls, window blinds
• RS-27-004 Markham restroom and plumbing
49 • 2765 Don Fernando Pacheco Adobe Restoration
• 2774 Willow Pass Center Courtyard and Patio
• 2778 Camp Concord Dining Hall and Equipment
• 2794 Concord Community Pool Boiler Replacement
• 2644 Willow Pass Center Interior Modernization
• 2754 Citywide Median Maintenance and Refurb
• 2755 Citywide Tree Planting and Replacement
• 2758 Playground Replacements

Page 213 of 217 ends

FY 2029, 2030,
and 2031
of Five-Year CIP
50

Page 214 of 217 ends

Future Years 3-5 of the Five-Year
Capital Improvement Plan
Advantages
• Efficient scheduling of City resources
• Grant Opportunities
• Outside agencies/utilities coordination
• Master planned projects
• Projects dependent on preceding projects
51

Page 215 of 217 ends

Projects Scheduled for Future Years 3-5
52 Category FY 2029 FY 2030 FY 2031
Local Streets and
Roads
$36M $26M $30M
Sanitary Sewer and
Stormwater
$7.8M $5M $5.3M
Buildings, Parks and
Recreation
$8.2M $6.4M $2.6M

Page 216 of 217 ends

Questions and
Feedback on
Capital Budget
Recommendations
53

Page 217 of 217 ends

Staff Report
Date: May 12, 2026
To: City Council
From: Valerie J. Barone, City Manager
Reviewed by: Kit Jory, Director of Public Works
Prepared by: Abhishek Parikh, Deputy Director PW - Transportation [email protected]
(925) 671-3139
Subject: Considering Adoption of the City of Concord Comprehensive Safety Action Plan (CSAP) developed under the Safe Streets and Roads for All (SS4A) Federal Grant Program.

CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061 (b)(3), 15378, and/or Public Resources Code Section 21065.

Report in Brief
The CSAP is grounded in a five-year collision analysis (2021–2025) of 1,804 total injury collisions, of which 164 (9%) involved fatal (19) or severe injuries (145). The Plan (Attachment 2) identifies the corridors where severe collisions are most concentrated, the High Injury Network; lists the fourteen existing Concord plans that align with CSAP’s goals; outlines a Safe Streets Toolkit of evidence-based countermeasures drawn from Federal Highway Administration (FHWA) research; and establishes a project prioritization framework for implementation. Adoption of the CSAP will enable the City to compete for SS4A implementation grants and other Federal and State safety funding for which an adopted comprehensive safety action plan is a prerequisite.

Recommended Action
Adopt a Resolution adopting the City of Concord Comprehensive Safety Action Plan (CSAP) as developed under the Safe Streets and Roads for All (SS4A) Grant Program; authorize the City Manager to submit the adopted Plan to the U.S. Department of

6.c6.c6.c6.c6.c6.c

Page 1 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
Transportation in accordance with the Safe Streets for All (SS4A) Grant Program requirements; and make the CEQA determinations as provided in this staff report.

Background
In June 2025, City Council approved a Professional Services Agreement with TJKM Transportation Consultants, who led the development of the CSAP. City staff directed the scope, managed the engagement process, provided local data and policy context, conducted community outreach, and shaped the Plan’s recommendations in alignment with City Council’s priorities and the City’s Vision Zero goals. The CSAP was developed using the Safe System Approach — a framework that acknowledges human error is inevitable and designs the road system to minimize the serious consequences of crashes.

The CSAP project objectives include:

1. Data-Driven Analysis: Conduct a comprehensive five-year assessment of traffic collision data to identify high-risk intersections and corridors, high-injury networks, and prevalent contributing factors across all modes.

2. Community Engagement: Engage diverse community stakeholders to gather insights, reflect the safety needs and priorities of all residents, and ensure the Plan’s strategies are informed by those most affected by traffic safety challenges, including residents in historically underserved communities. The CSAP engagement program included a dedicated project website (concordsafestreets.org), a multi-agency Steering Committee convening representatives from four agencies (BART, County Connection, Contra Costa Fire District and Mount Diablo School District) across three steering committee meetings, three public community outreach meetings, a citywide online safety survey generating 651 responses, a web-based map input platform collecting 77 location-specific comments, and a presentation to the Bicycle and Pedestrian Advisory Committee on May 6, 2026.

3. Existing Plans Review: Review and align the CSAP with fourteen existing City and regional plans, policies, and programs, to ensure the Plan improves upon existing efforts and does not duplicate prior safety investments.

4. Safe System Countermeasures: Develop a Safe Streets Toolkit of evidence-based engineering, enforcement, and education countermeasures drawn from FHWA research and calibrated to Concord’s specific collision patterns and High Injury Network findings.

5. Implementation Framework: Provide a clear roadmap for prioritizing and executing recommended safety measures, including project identification, performance metrics, and potential funding sources.

Page 2 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
Enhanced Collision Dashboard: Upgrade Concord’s existing Collision Dashboard to incorporate CSAP implementation tracking, map countermeasures to collisions, automate project identification for grant applications, provide enforcement analytics for red-light running, and develop a query interface to identify trends and correlations among collision factors.

Analysis
CSAP is organized into the following chapters, each addressing a core component of the City’s comprehensive safety strategy:

Chapter 1 – Introduction establishes the CSAP’s purpose, policy context, and organizing framework. It documents the City’s formal commitment to Vision Zero, presents the Safe System Approach and its five pillars (Safe Road Users, Safe Vehicles, Safe Speeds, Safe Roads, and Post-Crash Care), and situates the Plan within its Federal SS4A program context.

Chapter 2 – Existing Plans, Policies, and Programs inventories and synthesizes fourteen existing plans and programs relevant to transportation safety in Concord.

These include the Concord 2030 General Plan Transportation Element (2015), the Bicycle, Pedestrian & Safe Routes to Transit Plan (2016), the Complete Streets Feasibility Study for Willow Pass Road, Galindo Street and Cowell Road (2020), the Local Roadway Safety Plan (2022), the Pine Hollow Road Complete Streets Feasibility Study (2023), the Contra Costa County Complete Streets Safety Assessment (2024), the Five-Year Capital Improvement Plan FY2025–2029 (2024), and the Safe Trips to BART: An Action Plan for Safer Roadways (2025), among others. Each document is assessed for how it informs the CSAP’s goals, ensuring the Plan builds upon and aligns with prior safety investments without duplication.

Chapter 3 – Data-Driven Safety Analysis presents the technical foundation of the CSAP. Five years of collision records (2021–2025) drawn from the Transportation Injury Mapping System (TIMS), the Statewide Integrated Traffic Records System (SWITRS), and Concord Police Department reports were analyzed across multiple dimensions including severity, mode, time of day, day of week, location type, collision type, and contributing factors. Key findings include:
• 1,804 total collisions were reported over the five-year study period. Of these, 164 (9 percent) involved fatal or severe injuries (KSI), comprising 19 fatal collisions (20 fatalities) and 145 severe injury collisions. An additional 427 collisions resulted in visible injuries, while the remaining 1,213 were classified as complaints of pain.
• Vulnerable road users are significantly overrepresented in severe outcomes relative to their share of total collisions: pedestrian-involved collisions account for 28 percent of KSI while representing only 11 percent of all injury collisions;

Page 3 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
bicyclists account for 13 percent of KSI and 8 percent of injury collisions; motorcyclists account for 19 percent of KSI and 7 percent of injury collisions • Broadside collisions are the most prevalent collision type, accounting for 38 percent of all injury collisions and 29 percent of KSI collisions, consistent with the high concentration of collision activity at intersections and identifying intersection safety as the central focus for safety investment. • The analysis culminates in the identification of Concord’s High Injury Network (HIN) the corridors and intersections where fatal and serious injury collisions are most heavily concentrated — which provides the spatial framework for prioritizing safety investments. Collision profiles were also developed to characterize recurring crash patterns by severity, mode, and contributing factor, directly informing the countermeasure selection Chapter 4 – Community Engagement and Outreach documents a robust community engagement program conducted from February through May 2026 to support development of the CSAP. Recognizing that traffic safety is a shared responsibility, the process prioritized input from residents, partner agencies, and local stakeholders to identify concerns, validate technical analyses, and build support for recommended strategies. Engagement efforts included a dedicated project website (www.concordsafestreets.org), a multi-agency Steering Committee, three public outreach meetings, a citywide online safety survey, an interactive web-based map input tool, and a presentation to the Bicycle and Pedestrian Advisory Committee. The project website served as a central information hub, while the Steering Committee—comprising representatives from key local and regional agencies—provided technical oversight and policy guidance through a series of meetings. Three community outreach meetings, held between March and May 2026, created multiple opportunities for the public to review findings, provide feedback, and shape the Plan’s recommendations.

Community input was extensive and directly informed CSAP’s priorities. The online survey generated 651 responses, revealing high levels of concern about traffic safety, with speeding and red-light running identified as top issues and strong support for enforcement and pedestrian-focused improvements. The interactive map tool produced 77 submissions highlighting 106 safety concerns, with the greatest concentration along major corridors such as Willow Pass Road, Concord Boulevard, Treat Boulevard, and Monument Boulevard—locations that align closely with the High Injury Network identified through collision data analysis. Overall, the strong alignment between community-identified concerns and technical findings underscores the validity of the CSAP’s recommendations and reflects a plan that is both data-driven and community- informed.

Chapter 5 – Safe Streets Toolkit presents a comprehensive suite of evidence-based countermeasures drawn from FHWA research, including the Crash Modification Factor (CMF) Clearinghouse, to guide implementation of the CSAP. Countermeasures are

Page 4 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
organized into four categories: Signalized Intersections, Unsignalized Intersections, Roadway Segments, and Additional Countermeasures (education, enforcement, and programmatic initiatives). Each countermeasure is characterized by the collision types it addresses, its Crash Reduction Factor (CRF), expected service life, and systemic implementation potential. The Toolkit is designed as a flexible technical resource for City staff to select context-sensitive improvements based on site-specific conditions, collision history, and available resources — not a prescriptive list. Consistent with the Safe System Approach, the Toolkit integrates engineering, enforcement, and education strategies, recognizing that infrastructure improvements must be complemented by behavioral programs to address speeding, impaired driving, distracted driving, and failure to yield.

Chapter 6 - Proposed Safety Projects identifies 16 proposed projects across four categories, informed by 1,804 injury collisions recorded citywide from 2021–2025. All projects are subject to further engineering analysis and environmental review, and implementation is contingent upon the availability of funding for design and construction.

These projects are also presented in Attachment 3.

High Injury Network Corridor Improvements (Projects 1, 4, 5, 6, 7, 8, 9, and 10) • Project 1 would implement targeted multimodal safety improvements along five HIN-priority corridors — Clayton Road, Monument Boulevard, Willow Pass Road, Concord Avenue, and Galindo Street — collectively associated with 687 injury collisions, including 8 fatalities and 52 severe injuries.

Improvements include speed feedback signs, enhanced lighting, LPI, high- visibility crosswalks, ADA curb ramps, HFST, C-V2X technology, EVP GPS, and access management medians. This project is to be proposed under an SS4A Implementation Grant anticipated to be submitted on June 26. • Project 4 would close bicycle facility gaps on Monument Boulevard, Cowell Road, Galindo Street, Diamond Boulevard, Market Street, and Clayton Road through shared-use path enhancements, protected bike lane intersection treatments, and crossing improvements.
• Project 5 would address Concord Boulevard (SR-242 to Kirker Pass Road) with sidewalk gap closures, HAWK/beacon crosswalk upgrades, and speed feedback signs near two schools.
• Project 6 would implement median, signal, and pedestrian crossing improvements on Port Chicago Highway, including at Bonifacio Street and North 6th Street, where broadside and pedestrian collision patterns exist. • Project 7 would improve delineation, edge lines, rumble strips, and lighting on the northern segment of Willow Pass Road.

Page 5 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
• Project 8 would address Treat Boulevard (Winton Drive to Clayton Road) with signal upgrades, Lead Pedestrian Interval (LPI), Pedestrian Hybrid Beacon (HAWK signals), High Friction Surface Treatment (HFST) and a feasibility study for a bicycle and pedestrian connection between San Miguel Road and Marietta Circle.
• Project 9 would install a raised median, speed feedback signs, and crosswalk enhancements on Oak Grove Road, including at the Contra Costa Trail crossing.
• Project 10 would address geometric, signing, striping, HFST, guardrail, and median improvements on Ygnacio Valley Road and Kirker Pass Road.

Complete Streets and Active Transportation (Projects 2 and 3) • Project 2 would advance design and construction of complete street improvements on Monument Boulevard (Iron Horse Trail to Walters Way), Cowell Road, and Galindo Street, building on an existing feasibility study implementation of the projects listed in this section is anticipated through a combination of competitive Federal, State and Regional funding program. • Project 3 would implement a Safe Routes to School program citywide, including curb reconfiguration, raised crosswalks, advanced stop bars, dynamic signage, and bike lanes near schools.

Citywide Safety Programs (Projects 11 and 12)
• Project 11 would fill sidewalk gaps citywide, prioritizing HIN corridors with pedestrian collision history — including Clayton Road, 6th Street, and Cowell Road.
• Project 12 would install LPI and right-turn-on-red restrictions at approximately 15 intersections with recorded pedestrian severe-injury collisions.

Planning and Policy Initiatives (Projects 13, 14, 15, and 16) • Project 13 would fund complete street feasibility studies and preliminary design on seven HIN corridors — Clayton Road, Willow Pass Road, Treat Boulevard, Concord Avenue, Market Street, Detroit Avenue, and Diamond Boulevard (approximately 12+ miles combined) to establish the engineering foundation for future capital investment.
• Project 14 would establish a corridor speed management program with data collection, hotspot identification, and speed feedback deployment, responding to unsafe speed as a contributing factor in collisions.

Page 6 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
• Project 15 would create a formal citywide traffic calming policy and program for residential neighborhoods, defining program criteria, eligible treatments, and a prioritization process.
• Project 16 would deploy machine-learning traffic conflict sensors and smart infrastructure on key corridors and school zones to identify near-miss patterns and guide future investment, consistent with the City's Transportation Management Center vision and SMART grant eligibility.

Chapter 7 – Implementation, Evaluation, and Funding Strategy establishes the framework for implementing, monitoring, and evaluating the CSAP to ensure continued progress toward the City’s safety goals. Consistent with SS4A program requirements, the CSAP is intended to function as a living document, with periodic updates to incorporate new collision data, assess the performance of implemented projects, and reflect evolving best practices. Implementation of CSAP recommendations will be coordinated with the City’s Capital Improvement Program (CIP) and prioritized using a data-driven methodology that emphasizes collision frequency and severity, project readiness, and cost-effectiveness, with a focus on locations within the City’s High Injury Network. The chapter establishes a performance monitoring framework that includes tracking key measures such as reductions in fatal and serious injury collisions and implementation progress for prioritized projects. Concords enhanced collision dashboard will support ongoing monitoring and public reporting.

Relationship to Grant Funding
Adoption of this CSAP satisfies SS4A Action Plan requirements and positions the City to compete for SS4A Implementation Grant funding, with awards ranging from $2.5 million to $25 million on an 80/20 Federal-to-local cost split, and a Federal application deadline of May 26, 2026. In addition to SS4A, the Chapter identifies a diversified funding strategy spanning the Highway Safety Improvement Program (HSIP), Active Transportation Program (ATP), Office of Traffic Safety (OTS) grants, One Bay Area Grant (OBAG) program, CCTA Measure J and Measure X, and other Federal and State sources aligned with CSAP project types.

Financial Impact
There is no additional financial impact associated with adopting the CSAP. The total project budget of $445,928.89 was previously approved by City Council in June 2025 and is funded by $400,000 in USDOT SS4A grant funds and $100,000 in local matching funds set aside in CIP Project No. 2782. Adoption of the CSAP will position the City to apply for SS4A implementation grants and other Federal and State safety funding opportunities for which an adopted comprehensive safety action plan is a prerequisite.

Environmental Determination
Pursuant to CEQA Guidelines Sections 15060(c), 15061(b)(3), 15378, and Public Resources Code Section 21065, adoption of the Comprehensive Safety Action Plan is

Page 7 of 363 ends

City Council Agenda Report
Agenda Item No. 6.c
May 12, 2026
not subject to environmental review under the California Environmental Quality Act (CEQA) of 1970, as amended, as it does not constitute a “project”, does not commit the City to a definite course of action, does not constitute discretionary approval of a specific project, and will not result in a direct or reasonably foreseeable indirect physical change in the environment, and in the alternative is exempt from CEQA. This determination reflects the City’s independent judgement and analysis.

Public Contact
The City Council Agenda was posted.

Attachments

1. Resolution Adopting Concord’s Comprehensive Safety Action Plan

2. City of Concord Comprehensive Safety Action Plan (CSAP)

3. Recommended Safety Projects

4. Comprehensive Safety Action Plan Appendix

Page 8 of 363 ends

Res. No. 26-XX

BEFORE THE CITY COUNCIL OF THE CITY OF CONCORD

COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA
Adoption of the City of Concord Comprehensive
Safety Action Plan (CSAP)
Resolution No. 26-XX
/
WHEREAS, the City of Concord is committed to advancing its Vision Zero goals of eliminating traffic fatalities and severe injuries and promoting safe, healthy, and equitable mobility for all road users; and
WHEREAS, traffic fatalities and serious injuries are preventable and represent a significant public safety and public health concern requiring a proactive and coordinated response; and WHEREAS, the City of Concord recognizes that pedestrians, bicyclists, motorcyclists, children, transit riders, older adults, and people with disabilities are among the most vulnerable roadway users and deserve particular attention and protection in transportation planning and design; and
WHEREAS, a commitment to zero traffic deaths and serious injuries reflects the value of human life and the equitable opportunity for all Concord residents to travel safely; and WHEREAS, achieving safer streets requires a comprehensive approach that integrates engineering, education, enforcement, and emergency response strategies; and WHEREAS, the United States Department of Transportation established the Safe Streets and Roads for All (SS4A) program to support local agencies in developing and implementing Comprehensive Safety Action Plans to reduce roadway fatalities and serious injuries; and WHEREAS, in 2023 the U.S. Department of Transportation awarded the City $400,000 in Federal SS4A funds, supplemented by $100,000 in local matching funds from CIP Project 2782, for development of the Comprehensive Safety Action Plan (CSAP); and WHEREAS, the CSAP includes a five-year collision analysis, identification of a High Injury Network, a Safe Streets Toolkit of FHWA endorsed countermeasures, and a project prioritization framework; and
Attachment 1

Page 9 of 363 ends

Res. No. 26-XX 2
WHEREAS, the City conducted four multi-agency Steering Committee meetings with representatives from four agencies (BART, County Connection, Contra Costa Fire Protection District and Mount Diablo School District), three public community outreach meetings, a citywide online safety survey generating 651 responses, a web-based map input platform collecting 77 location- specific comments, and a presentation to the Bicycle and Pedestrian Advisory Committee; and WHEREAS, safety improvements must be pursued in a data-driven and equitable manner responsive to the needs of all communities within the City, including historically underserved and disadvantaged populations, to ensure that safety benefits are distributed fairly across all neighborhoods; and
WHEREAS, implementation of the CSAP requires ongoing collaboration among City departments, partner agencies, community members, residents, business owners, and other stakeholders; and
WHEREAS, the City recognizes the importance of coordination with regional partners, including the Contra Costa Transportation Authority, Metropolitan Transportation Commission, California Department of Transportation, law enforcement agencies, and community organizations, to improve the safety, comfort, and accessibility of streets throughout the City; and WHEREAS, adoption of the CSAP positions the City to apply for competitive SS4A Implementation Grants and other Federal and State transportation safety funds; and WHEREAS, the City of Concord is committed to regular monitoring, reporting, and evaluation of safety outcomes to ensure accountability and measure progress toward achieving the goals of the CSAP; and
WHEREAS, pursuant to CEQA Guidelines Sections 15060(c), 15061(b)(3), 15378, and Public Resources Code Section 21065, adoption of the CSAP is not a project subject to CEQA review and is alternatively exempt; and

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CONCORD DOES RESOLVE AS FOLLOWS:

Section 1. Pursuant to CEQA Guidelines Sections 15060(c), 15061(b)(3), 15378, and Public Resources Code Section 21065, adoption of the Comprehensive Safety Action Plan is not subject to

Page 10 of 363 ends

Res. No. 26-XX 3
environmental review under the California Environmental Quality Act (CEQA) of 1970, as amended, as it does not constitute a “project”, does not commit the City to a definite course of action, does not constitute discretionary approval of a specific project, and will not result in a direct or reasonably foreseeable indirect physical change in the environment, and in the alternative is exempt from CEQA.

This determination reflects the City’s independent judgement and analysis. This determination reflects the City’s independent judgement and analysis.

Section 2. The City Council hereby adopts the Comprehensive Safety Action Plan (CSAP).

Section 3. The City Council commits to a Vision Zero goal of eliminating all traffic-related fatalities and serious injuries on City streets by the year 2040 through a holistic and proactive Safe System Approach.

Section 4. The City Council directs City staff to implement the strategies, programs, and projects identified in the CSAP, prioritizing engineering solutions, education initiatives, equitable enforcement, and interagency coordination.

Section 5. The City Council acknowledges that achieving the Vision Zero goal requires significant and sustained effort, resources, and dedicated safety planning activities, and commits to allocating appropriate resources toward this end.

Section 6. The City Council directs that multimodal safety investments be made in a fair and equitable manner, with special consideration given to vulnerable road users and historically underserved communities.

Section 7. The City Council directs City staff to conduct annual monitoring, reporting, and evaluation of CSAP implementation progress, and to communicate findings clearly to the City Council, partner agencies, and the public.

Section 8. The City Manager, or her designee, is authorized to submit the adopted Plan to the FHWA and the U.S. Department of Transportation.

Section 9. This resolution shall become effective immediately upon its passage and adoption. //
//
//

Page 11 of 363 ends

Res. No. 26-XX 4
PASSED AND ADOPTED by the City Council of the City of Concord on May 12, 2026, by the following vote:

AYES: Councilmembers -
NOES: Councilmembers -
ABSTAIN: Councilmembers -
ABSENT: Councilmembers -
I HEREBY CERTIFY that the foregoing Resolution No. 26-XX was duly and regularly adopted at a regular meeting of the City Council of the City of Concord on May 12, 2026.

Joelle Fockler, MMC
City Clerk
APPROVED AS TO FORM:

Susanne Meyer Brown
City Attorney

Page 12 of 363 ends

Comprehensive
Safety Action Plan
2026
CSAP
City of
Attachment 2

Page 13 of 363 ends

THIS PAGE IS INTENTIONALLY LEFT BLANK

Page 14 of 363 ends

Comprehensive
Safety Action Plan
2026
City of
Prepared by: Signed for Approval:

Nayan Amin, TE
Professional Civil Engineer & Project Manager,
TJKM Transportation Planning Consultants

Page 15 of 363 ends

Concord Comprehensive Safety Action Plan

Page 4 ends

LEADERSHIP COMMITMENT

CITY OF CONCORD
1950 Parkside Drive
Concord, CA 94519
________________, 2026
Dear Members of the Community,
I am writing to affirm the City of Concord’s commitment to the goals established in Resolution No. 26-__, adopted by the City Council on May 12, 2026, which adopts the Comprehensive Safety Action Plan (CSAP) and commits the City to a Vision Zero goal of reducing traffic-related fatalities and severe injuries (also referred to as serious injuries under the Safe Streets and Roads for All program) on City streets by fifty (50) percent by the year 2040, with the eventual goal of eliminating all such fatalities and severe injuries on City streets by the year 2050.

The CSAP responds to a documented and significant roadway safety pattern. Between 2021 and 2025, the City of Concord recorded 1,804 injury collisions, including 164 incidents resulting in fatalities or severe injuries, and 19 fatalities. The CSAP provides a data-driven framework grounded in the Safe System Approach to address this pattern. The Plan draws on a five-year collision review using SWITRS and TIMS data, identifies a High Injury Network where the most significant safety needs are concentrated, and selects FHWA Proven Safety Countermeasures appropriate to local roadway conditions.

As City Manager, I am directing City staff to implement the CSAP through a coordinated, multidisciplinary effort that integrates engineering improvements, education and outreach, enforcement coordination, emergency response collaboration with public safety partners, and post- crash care. Implementation will include sustained interagency coordination with regional, State, and Federal partners, including the Contra Costa Transportation Authority, the Metropolitan Transportation Commission, and the California Department of Transportation, as well as coordination with adjacent jurisdictions and roadway owners on shared corridors and facilities within or affecting the City.

The CSAP was developed through a comprehensive public engagement process. The City conducted three multi-agency Steering Committee meetings with representatives from BART, County Connection, the Contra Costa County Fire Protection District, and the Mount Diablo Unified School District; three public community outreach meetings; a citywide online safety survey that generated 651 responses; a web-based map input platform that collected 77 location-specific comments; and a presentation to the Bicycle and Pedestrian Advisory Committee. This process produced a Plan that reflects the safety priorities of the broader Concord community and its institutional partners.

Building on this foundation, the City of Concord intends to pursue Federal funding under the Safe Streets and Roads for All (SS4A) Implementation Grant program to advance the highest-priority projects identified in the CSAP, with non-Federal matching funds committed in accordance with applicable program requirements. To ensure continued accountability, City staff will conduct annual public reporting on progress toward reducing roadway fatalities and severe injuries and will maintain the CSAP publicly accessible online.

I extend my appreciation to the Mayor and City Council for adopting Resolution No. 26-__, to the multi- agency Steering Committee for its substantive contributions, and to the residents and businesses of Concord who participated in the engagement process. This effort reflects a shared commitment to safer streets for everyone who lives, works, learns, and travels in the City of Concord.

Sincerely,
City Manager, City of Concord

CITY OF CONCORD
1950 Parkside Drive
Concord, CA 94519
________________, 2026
Dear Members of the Community,
On behalf of the City Council of the City of Concord, we reaffirm our commitment to the goals established in Resolution No. 26-__, which adopts the Comprehensive Safety Action Plan (CSAP) and commits the City to a Vision Zero goal of reducing traffic-related fatalities and severe injuries (also referred to as serious injuries under the Safe Streets and Roads for All program) on Concord streets by fifty (50) percent by the year 2040, with the eventual goal of eliminating all such fatalities and severe injuries by 2050. We adopted this resolution at our regular meeting on May 12, 2026.

The safety of every person traveling through Concord remains among the City Council’s highest responsibilities. Each fatality and severe injury represents a preventable loss to a family, a neighborhood, and the broader Concord community. Through the CSAP, the City Council has formalized a commitment to address these losses through proactive, data-driven, and coordinated action. The Plan focuses on the safety of all roadway users, including pedestrians, bicyclists, motorcyclists, motorists, transit users, children, older adults, and people with disabilities.

The City Council supports implementation of the CSAP through a Safe System Approach that recognizes that human error is inevitable but the consequences of that error do not have to be fatal. We have directed City staff to implement the strategies, programs, and projects identified in the Plan, and to assess relevant transportation policies, plans, design guidelines, and standards to identify opportunities to prioritize roadway safety in City operations and decision-making.

The City Council has authorized the City Manager, or her designee, to submit the adopted Plan to the Federal Highway Administration and the U.S. Department of Transportation, and to apply for, accept, and execute grant agreements under the Safe Streets and Roads for All (SS4A) Implementation Grant program and other Federal and State transportation safety funding to advance implementation of the CSAP. We acknowledge that achieving the Vision Zero goal requires significant and sustained effort, resources, and dedicated safety planning activities, and we are committed to allocating appropriate City resources toward this end.

To ensure ongoing transparency and accountability to the residents we serve, the City Council has directed staff to conduct annual public reporting on progress toward reducing roadway fatalities and severe injuries, to maintain the CSAP publicly accessible online, and to communicate findings to the City Council, partner agencies, and the public. Continued public engagement will remain central to this effort.

We commend the work of City staff, the multi-agency Steering Committee, and the residents, businesses, and stakeholders who contributed to the development of the Comprehensive Safety Action Plan. Their dedication has produced a foundation upon which the City Council, in partnership with our regional, State, and Federal transportation agencies, can advance meaningful safety improvements on the streets of Concord.

Sincerely,
Mayor
Vice-Mayor
City Council Members
City of Concord

Page 16 of 363 ends

Concord Comprehensive Safety Action Plan

Page 5 ends

POLICY RESOLUTION

Res. No. 26-

BEFORE THE CITY COUNCIL OF THE CITY OF CONCORD

COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA

Adoption of the City of Concord Comprehensive
Safety Action Plan (CSAP)
Resolution No. 26-
/

WHEREAS the City of Concord is committed to advancing its Vision Zero goals of eliminating traffic fatalities and severe injuries and promoting safe, healthy, and equitable mobility for all road users; and
WHEREAS, traffic fatalities and serious injuries are preventable and represent a significant public safety and public health concern requiring a proactive and coordinated response; and WHEREAS, the City of Concord recognizes that pedestrians, bicyclists, motorcyclists, children, older adults, and people with disabilities are among the most vulnerable roadway users and deserve particular attention and protection in transportation planning and design; and WHEREAS, a commitment to zero traffic deaths and serious injuries reflects the value of human life and the equitable opportunity for all Concord residents to travel safely; and WHEREAS, achieving safer streets requires a comprehensive approach that integrates engineering, education, enforcement, and emergency response strategies; and WHEREAS, the United States Department of Transportation established the Safe Streets and Roads for All (SS4A) program to support local agencies in developing and implementing Comprehensive Safety Action Plans to reduce roadway fatalities and serious injuries; and WHEREAS, in 2023 the U.S. Department of Transportation awarded the City $400,000 in Federal SS4A funds, supplemented by $100,000 in local matching funds from CIP Project 2782, for development of the Comprehensive Safety Action Plan (CSAP); and WHEREAS, the CSAP includes a five-year collision analysis, identification of a High Injury Network, a Safe Streets Toolkit of FHWA endorsed countermeasures, and a project prioritization framework; and
WHEREAS the City conducted three multi-agency Steering Committee meetings with

Res. No. 26- 2
representatives from four agencies (BART, County Connection, Contra Costa Fire Protection District and Mount Diablo School District), three public community outreach meetings, a citywide online safety survey generating 651 responses, a web-based map input platform collecting 77 location- specific comments, and a presentation to the Bicycle and Pedestrian Advisory Committee; and WHEREAS, safety improvements must be pursued in a data-driven and equitable manner responsive to the needs of all communities within the City, including historically underserved and disadvantaged populations, to ensure that safety benefits are distributed fairly across all neighborhoods; and
WHEREAS, implementation of the CSAP requires ongoing collaboration among City departments, partner agencies, community members, residents, business owners, and other stakeholders; and
WHEREAS, the City recognizes the importance of coordination with regional partners, including the Contra Costa Transportation Authority, Metropolitan Transportation Commission, California Department of Transportation, law enforcement agencies, and community organizations, to improve the safety, comfort, and accessibility of streets throughout the City; and WHEREAS adoption of the CSAP positions the City to apply for competitive SS4A Implementation Grants and other Federal and State transportation safety funds; and WHEREAS, the City of Concord is committed to regular monitoring, reporting, and evaluation of safety outcomes to ensure accountability and measure progress toward achieving the goals of the CSAP; and
WHEREAS, pursuant to CEQA Guidelines Sections 15060©, 15061(b)(3), 15378, and Public Resources Code Section 21065, adoption of the CSAP is not a project subject to CEQA review and is alternatively exempt; and

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CONCORD DOES RESOLVE AS FOLLOWS:

Section 1. This item is exempt from California Environmental Quality Act (CEQA) as it does not constitute a "significant effect on the environment" within the meaning of Public Resources Code Section 21065 and pursuant to CEQA Guidelines Sections 15060(c), 15061 (b)(3), and 15378

Page 17 of 363 ends

Concord Comprehensive Safety Action Plan

Page 6 ends

ACKNOWLEDGMENTS CONCORD CSAP STEERING COMMITTEE

CITY OF CONCORD STAFF CONSULTANT TEAM
This Comprehensive Safety Action Plan (CSAP) was developed by the City of Concord with funding provided through a Safe Streets and Roads for All (SS4A) grant awarded by the Federal Highway Administration (FHWA), which is a testament to the City’s commitment to making its streets safer for every resident and visitor.

The CSAP builds on a strong foundation of prior planning work, including the Concord Bicycle, Pedestrian, and Safe Routes to Transit Plan (2016), the Complete Streets Feasibility Study for Willow Pass Road, Galindo Street, and Cowell Road (2020), and the Safe Trips to BART Action Plan (2025). It is further anchored in the principles of Vision Zero, the global movement committed to eliminating all traffic fatalities and severe injuries from our transportation network.

The City of Concord extends its sincere gratitude to the regional partner agencies and community organizations whose
engagement and expertise were indispensable in shaping this plan. The perspectives of stakeholders and community members across Concord ensured that the CSAP reflects the real safety needs and priorities of all residents, whether they travel by foot, bicycle, transit, or car.

The City of Concord is fully committed to implementing
the strategies set forth in this CSAP and to working in close partnership with its partner agencies to achieve the ultimate goal:
zero traffic fatalities and serious injuries on Concord’s streets.

The City of Concord’s CSAP was developed with the guidance and oversight of a multidisciplinary Steering Committee representing key municipal, regional, and institutional stakeholders. The committee provided strategic direction throughout the planning process, contributing expertise in public works, transportation, emergency services, transit operations, and school safety to ensure the CSAP reflects the diverse needs of the Concord community.
• Abhishek Parikh, Deputy Director, Department of Public Works • Virendra Patel, TE, Transportation Program Manager,
Department of Public Works
• Nayan Amin, TE (Project Manager)
• Ruta Jariwala, PE, TE
• Andrew Dickinson
Abhishek Parikh City of Concord Public Works Department Virendra Patel City of Concord Public Works Department, Project Manager Shawn Phalen City of Concord Public Works Department
Jesse Crawford City of Concord
Danielle Thomas Contra Costa County Fire Protection Department Pranjal Dixit Contra Costa County Transportation Authority (CCCTA) Kamla Parks Bay Area Rapid Transit (BART)
Melanie Koslow Mt. Diablo Unified School District

AGENCYREPRESENTATIVE

Page 18 of 363 ends

Concord Comprehensive Safety Action Plan

Page 7 ends

EXECUTIVE SUMMARY
SS4A ACTION PLAN COMPONENTS
The City of Concord has developed this Comprehensive Safety Action Plan (CSAP) in accordance with the requirements of the Safe Streets and Roads for All (SS4A) grant program administered by the U.S.

Department of Transportation. The CSAP is guided by the Safe System Approach and the City’s formal commitment to Vision Zero. Through a City Council Resolution adopted in May 2026, Concord has committed to reducing traffic-related fatalities and serious injuries by 50 percent by 2040, with the ultimate goal of eliminating all such outcomes on City streets by 2050.

The primary objectives of the CSAP are to:
• Conduct a comprehensive, data driven safety analysis of Concord’s transportation network for the period January 2021 through December 2025.
• Identify the City’s High Injury Network (HIN), comprising the corridors and intersections where fatal and serious injury (KSI) collisions are most heavily concentrated. • Develop a Safe Streets Toolkit of evidence-based countermeasures organized under the Safe System Approach to address identified collision patterns and systemic risk factors. • Identify and prioritize a portfolio of actionable safety projects and programs, including both systemic network-wide improvements and targeted interventions at high-injury corridors and intersections. • Establish a framework for implementation, performance monitoring, and funding to ensure sustained, accountable progress toward the City’s Vision Zero goals.

Between January 1, 2021 and December 31, 2025, a total of 1,804 traffic collisions were reported in Concord, of which 164 (approximately nine percent) resulted in KSI, including 19 fatalities and 145 severe injuries. The safety analysis culminates in the identification of the City’s HIN, comprising 15 high-priority corridors and 12 high-priority intersections. Clayton Road rank as the highest-priority corridor, followed by Monument Boulevard, Willow Pass Road, Concord Boulevard, and Treat Boulevard. Together, these corridors and intersections account for a disproportionate share of KSI outcomes citywide and form the spatial foundation for the CSAP’s safety investment strategy.

The CSAP was informed by an inclusive community engagement process encompassing an interactive map-based public survey, community workshops, and a multidisciplinary Steering Committee representing City departments, law enforcement, EMS, schools, regional transportation partners, and community advocacy organizations. Special efforts were made to reach historically underserved communities and to ensure that safety investments reflect both collision data and the lived experiences of all Concord residents. The resulting safety project portfolio spans systemic improvements that proactively address risk across the transportation network and targeted design projects at specific HIN locations, each documented with proposed countermeasures and planning-level cost estimates. Project prioritization weighs safety performance, benefit to vulnerable road users, and proximity to schools, disadvantaged population impacts, and ease of implementation.

The CSAP aligns with the Safe System Approach and the SS4A program requirements, and is intended to function as a living document updated every two to five years. Implementation will be coordinated with the City’s Capital Improvement Program and supported by partnerships with Caltrans District 4, CCTA, MTC, the Concord Unified School District, and law enforcement. Annual performance monitoring will track reductions in KSI collisions and implementation progress, with findings reported publicly to ensure accountability. Through this commitment, the City of Concord aims to serve as a model for other Bay Area communities in achieving the goal of zero traffic fatalities and serious injuries.

Leadership Commitment and Goal Setting Chapter 1
Planning Structure Chapter 1 and Chapter 8
Safety Analysis Chapter 3
Engagement and Collaboration Chapter 4
Policy and Process Changes Chapter 7
Strategy and Project Selections Chapter 5 and Chapter 6 Progress and Transparency Chapter 8 and City of Concord Website Action Plan Adoption Date May 12, 2026

SECTIONACTION PLAN COMPONENTS

Page 19 of 363 ends

Concord Comprehensive Safety Action Plan

Page 8 ends

GLOSSARY
AADT Abbreviation for Average Annual Daily Traffic: A measure of the average volume of vehicle traffic on a roadway segment over a full year, expressed as a daily average.

ATP Abbreviation for Active Transportation Program: A California state grant program administered by Caltrans that funds projects encouraging increased use of active modes, including walking and bicycling.

BART Abbreviation for Bay Area Rapid Transit: The regional heavy- rail transit system serving the San Francisco Bay Area, including two stations within the City of Concord.

CCTA Abbreviation for Contra Costa Transportation Authority:

The Congestion Management Agency (CMA) for Contra Costa County, responsible for countywide transportation planning and the administration of Measure J sales tax funds.

CMA Abbreviation for Congestion Management Agency.

Collision Severity The intensity of a traffic collision, typically classified as: fatal, severe injury (serious injury), minor injury, possible injury, or property damage only (PDO).

CRF Abbreviation for Crash Reduction Factor: The estimated percentage reduction in collision frequency expected from the application of a specific countermeasure or safety treatment.

CSAP Abbreviation for Comprehensive Safety Action Plan.

Disadvantaged Communities Census tracts identified
as experiencing transportation disadvantage using screening tools such as CalEnviroScreen or MTC’s Communities of Concern framework. These communities face cumulative burdens including low income, high pollution exposure, social vulnerability, and limited transportation access.

FHWA Abbreviation for Federal Highway Administration: The federal agency within the U.S. Department of Transportation responsible for managing the national highway system and administering federal-aid highway programs, including HSIP and SS4A.

HIN Abbreviation for High Injury Network: A subset of streets within a jurisdiction typically a small percentage of total lane miles that accounts for a disproportionately large share of KSI collisions.

Prioritizing the HIN allows targeted safety investment for maximum impact.

HSIP Abbreviation for Highway Safety Improvement Program: A federal-aid funding program administered by Caltrans in California that provides funding for projects that demonstrably reduce traffic fatalities and serious injuries on public roads.

KSI Abbreviation for fatal and severe injury collisions (Killed and Severely Injured). KSI collisions are the primary focus of safety action planning as they represent the most critical outcomes of traffic violence.

LPI Abbreviation for Leading Pedestrian Interval: A signal timing strategy that gives pedestrians a head start before vehicles receive a green indication, increasing pedestrian visibility and reducing conflict with turning vehicles.

MOE Abbreviation for Measure of Effectiveness: A quantitative metric used to evaluate the performance of a transportation project or safety countermeasure relative to stated goals.

MTC Abbreviation for Metropolitan Transportation Commission: The transportation planning, financing, and coordinating agency for the nine-county San Francisco Bay Area.

PDO Abbreviation for Property Damage Only: A collision in which no persons were injured or killed, resulting only in damage to vehicles or property.

RAISE Grant Abbreviation for Rebuilding American
Infrastructure with Sustainability and Equity grant program: A U.S. DOT discretionary grant program that funds state and local transportation projects of significant regional or national impact.

Safe System Approach (SSA) A transportation safety
philosophy that acknowledges human error as inevitable and designs the transportation system (roads, speeds, vehicles, and road users) to absorb those errors without resulting in death or serious injury. Adopted by FHWA as the overarching framework for the National Roadway Safety Strategy.

SS4A Abbreviation for Safe Streets and Roads for All: A federal grant program providing $5 billion nationally over five years (2022– 2026) to help metropolitan areas, localities, and tribes develop and implement comprehensive safety action plans to reduce roadway fatalities and serious injuries.

SWITRS Abbreviation for Statewide Integrated Traffic Records System: The California Highway Patrol’s statewide database of traffic collision records, used as the primary crash data source for the Concord CSAP safety analysis.

TDM Abbreviation for Transportation Demand Management:

Strategies and programs that reduce single-occupancy vehicle travel demand through incentives, information, and land use coordination.

Type of Collision A classification of how the vehicles or road users involved in a collision came into contact with each other or with other objects (e.g., broadside, rear-end, head-on, sideswipe, pedestrian).

Vision Zero A national and international transportation safety movement, originating in Sweden, with the goal of eliminating all traffic fatalities and serious injuries. Vision Zero holds that deaths and severe injuries in the transportation system are preventable and unacceptable, and that system design (rather than individual behavior alone) is the primary lever for change.

Page 20 of 363 ends

Concord Comprehensive Safety Action Plan

Page 9 ends

CHAPTER 1

TABLE OF CONTENT

INTRODUCTION

APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G APPENDIX H

EXISTING PLANS,

POLICIES &

PROCESSES

SAFETY ANALYSIS
& HIGH-INJURY

NETWORK

IDENTIFICATION

IMPLEMENTATION,

EVALUATION &

FUNDING STRATEGY

POLICY & PROCESS

CHANGES

SAFETY PROJECTSENGAGEMENT &

COLLABORATION

SAFE STREETS

TOOLKIT
CHAPTER 5CHAPTER 2 CHAPTER 6CHAPTER 3 CHAPTER 7CHAPTER 4 CHAPTER 8

Page 10 ends

VISION ZERO
POLICY

RESOLUTION

ROAD SAFETY

RELATED PROJECTS

FROM EXISTING

PLANNING

COMMUNITY

OUTREACH &STEERING

COMMITTEE

PRESENTATIONS

MAP INPUT
PUBLIC

COMMENTS

ANALYSIS OF

COMMUNITY

SAFETY SURVEY

FHWA PROVEN
SAFETY

COUNTERMEASURES

PRELIMINARY SAFETY

PROJECT COST

ESTIMATES

MATRIX OF RELEVANT

PLANNING GOALS,

OBJECTIVES &POLICIES

Page 21 of 363 ends

CSAP
Introduction

CHAPTER ONE

Page 22 of 363 ends

Concord Comprehensive Safety Action Plan

Page 11 ends

The City of Concord is the largest City in Contra Costa County and a major regional hub within the San Francisco Bay Area.

Incorporated in 1905 as an agricultural community, Concord experienced substantial residential and commercial growth following the launch of Bay Area Rapid Transit (BART) service in 1973. With a 2020 U.S. Census population of approximately 125,410 residents and a total area of approximately 30.5 square miles in central Contra Costa County, Concord has developed into a significant regional center for commerce, employment, and transit.

As a general law city under California state law, Concord’s transportation responsibilities encompass planning and
maintaining the local street network, delivering capital improvement projects, and ensuring compliance with federal and state requirements related to transportation planning and environmental justice. The City maintains close coordination with the Contra Costa Transportation Authority (CCTA) which is the county’s Congestion Management Agency as well as with the Metropolitan Transportation Commission (MTC), Caltrans District 4, and BART on the full range of regional transportation priorities.

Concord’s transportation network is shaped by its
predominantly suburban land use pattern, where more than 70 percent of parcels are devoted to single-family residential uses and commercial activity is concentrated along principal arterials. The City’s most travelled corridors, namely Monument Boulevard, Clayton Road, Willow Pass Road, Galindo Street, Salvio Street, and Concord Boulevard form the backbone of daily movement for tens of thousands of residents. Two BART stations anchor the multimodal network: the Concord Station adjacent to the historic downtown, and the North Concord/ Martinez Station along Port Chicago Highway, both of which serve as critical destinations and transfer points for commuters and residents alike.

Traffic safety is not an abstract policy objective, but it is a direct expression of a community’s values. Every fatality on a public road represents a preventable loss; every severe injury carries consequences that ripple through families and communities for years. Despite sustained investment at the federal, state, and local levels, traffic- related collisions continue to exact an enormous toll in human suffering, economic cost, and diminished quality of life across California and the nation.

The consequences of traffic-related incidents are not borne equally across the community. Pedestrians, cyclists, older adults, children, and individuals with disabilities face a disproportionate share of fatal and serious injuries, and these impacts are most concentrated in communities that have experienced historic underinvestment in transportation infrastructure. In Concord, as in many Bay Area cities, these disparities are most pronounced along high-volume arterial corridors and in lower-income neighborhoods where residents depend most heavily on walking, cycling, and transit for their daily travel needs.

Improving transportation safety is both a civic responsibility and a practical foundation for building livable, sustainable, and inclusive communities. The Safe System Approach provides a proven framework for achieving this goal by shifting primary responsibility from individual road users to the design of the transportation system itself, ensuring that the network is forgiving of human error and that mistakes do not routinely result in death or severe injury. By embracing this approach, the City of Concord can achieve meaningful, lasting reductions in traffic-related fatalities and serious injuries while creating an environment that supports walking, cycling, and transit as safe and viable modes of travel.

The City of Concord recognizes that safe streets are fundamental to the health and vitality of its community. Through this CSAP, the City commits to a proactive, data-driven strategy for eliminating traffic fatalities and serious injuries that is grounded in evidence, guided by community need, and built for lasting impact.

The City of Concord is committed to improving safety across its entire transportation network, in alignment with the statewide goals established under California’s Strategic Highway Safety Plan and the principles of Vision Zero. With a clear recognition of the urgent need to reduce traffic fatalities and serious injuries, the City has set an ambitious but achievable goal: the reduction of traffic related fatalities and severe injuries on City streets by 50 percent by the year 2040, with the eventual goal of eliminating all traffic related fatalities and severe injuries on City streets by the year 2050.

The Concord City Council has formally adopted a Resolution committing to Vision Zero and endorsing this Comprehensive Safety Action Plan as the City’s roadmap for achieving that goal. The full text of the Resolution, together with the City’s Vision Zero policy commitment, is included in Appendix A. In adopting this resolution, the City affirms its resolve to serve as a regional leader in roadway safety, leveraging engineering solutions, sound policy, and sustained investment to fundamentally improve the safety of its streets.

This commitment reflects the City’s core value of prioritizing the safety and wellbeing of all Concord residents, regardless of how they choose to travel. To achieve its Vision Zero goal, the City will pursue a comprehensive, data-driven approach that addresses the full range of factors contributing to traffic collisions from engineering improvements at high-risk locations to education initiatives that promote safe road-user behavior and enforcement efforts that uphold traffic safety laws.

City leadership is fully committed to this vision and has dedicated the resources and institutional will necessary to drive meaningful, measurable progress. Ongoing performance monitoring, rigorous data analysis, and sustained stakeholder engagement will ensure that Concord remains on track toward its safety targets. Through this commitment, the City aims to serve as a model for other communities across the Bay Area and California in achieving the goal of zero traffic fatalities and serious injuries.

IMPORTANCE OF TRANSPORTATION SAFETY LEADERSHIP COMMITMENT AND GOAL SETTING

Page 23 of 363 ends

Concord Comprehensive Safety Action Plan

Page 12 ends

CHAPTER 1: INTRODUCTION
This chapter establishes the purpose, need, and scope of the Comprehensive Safety Action Plan (CSAP) in accordance with Safe Streets and Roads for All (SS4A) program requirements. It introduces the City of Concord’s commitment to the Safe System Approach and Vision Zero, sets forth the City’s safety goals and objectives, and describes the policy context in which the CSAP is situated, including alignment with federal, state, and regional safety priorities.

CHAPTER 2: EXISTING PLANS, POLICIES AND PROCESSES
Consistent with SS4A guidance, this chapter inventories the local and regional plans, policies, and processes that shape roadway safety in Concord. It assesses prior planning efforts, including the Local Roadway Safety Plan, General Plan Transportation Element, Multimodal Corridor Plans, Downtown Specific Plan, Complete Streets Feasibility Study, and Bicycle and Pedestrian Plan, alongside relevant regional initiatives. The review identifies gaps and opportunities, ensuring the CSAP reinforces and integrates with the City’s established planning frameworks rather than duplicating them.

CHAPTER 3: SAFETY ANALYSIS AND HIGH-INJURY NETWORK IDENTIFICATION This chapter presents a comprehensive, data-driven safety analysis of collision patterns across the City of Concord for the period January 2021 through December 2025. Collisions are examined by severity, roadway type, user category, temporal patterns, and primary contributing factors. Consistent with SS4A best practices, the analysis culminates in the identification of the City’s High-Injury Network (HIN), comprising the corridors and intersections where fatal and serious injury collisions are disproportionately concentrated, providing the analytical foundation for targeted safety investment.

CHAPTER 4: ENGAGEMENT AND COLLABORATION
This chapter describes the community engagement process conducted to inform the CSAP, consistent with SS4A requirements. It details outreach methods, including an interactive map-based survey, community workshops, and a multidisciplinary Steering Committee, and highlights efforts to reach historically underserved communities alongside key institutional stakeholders such as public agencies, law enforcement, schools, and advocacy groups. The input gathered through this process directly informed the development of safety priorities and project recommendations.

CHAPTER 5: SELECTION OF SAFETY STRATEGIES (SAFE STREETS TOOLKIT) This chapter presents a comprehensive suite of safety strategies organized under the Safe System

ORGANIZATION OF CSAP
Approach, spanning engineering, education, enforcement, and emerging technology. The Safe Streets Toolkit assembles evidence-based countermeasures drawn from Federal Highway Administration (FHWA) resources, national best practices, and California state guidance. Each strategy is tailored to the risk factors identified in the safety analysis and organized to guide implementation across varied roadway contexts and user groups.

CHAPTER 6: SAFETY PROJECTS
This chapter identifies and prioritizes a portfolio of actionable safety projects and programs consistent with SS4A Action Plan requirements. The project list spans systemic improvements, targeted corridor and intersection treatments, and dedicated enhancements for pedestrians and bicyclists. Each project is documented with a description, location, proposed countermeasures, and planning-level cost estimate.

Prioritization reflects a multi-factor methodology that weighs safety performance data, disadvantaged and vulnerable road user considerations, risk exposure, project readiness, and community input.

CHAPTER 7: POLICY AND PLANNING CHANGES
This chapter presents recommended planning and policy initiatives that address identified gaps in Concord’s current regulatory and operational framework. The initiatives span speed management, street design standards, active transportation planning, traffic impact analysis, and safety performance monitoring. Each initiative is grounded in existing municipal authority, advanced through mechanisms such as Council resolutions, Municipal Code amendments, and departmental policies, and is structured to strengthen the City’s competitiveness for state and federal safety grant programs including SS4A, HSIP, and ATP. Together, these initiatives form the institutional foundation upon which the capital improvements and programs described throughout the CSAP can be delivered, sustained, and evaluated over time.

CHAPTER 8: IMPLEMENTATION, EVALUATION AND FUNDING STRATEGY This chapter establishes the framework for implementing, monitoring, and evaluating the CSAP over time. It defines performance measures aligned with SS4A safety outcomes, including measurable reductions in fatalities and serious injuries, and sets out procedures for tracking progress, reporting results, and updating the plan as conditions evolve. The chapter also identifies a range of potential funding sources, including SS4A grants and complementary federal, state, regional, and local programs, to support project delivery. Throughout, the chapter reinforces the continuous improvement ethos at the core of the Safe System Approach.

Page 24 of 363 ends

Existing Plans,
Policies & Processes
CSAP

CHAPTER TWO

Page 25 of 363 ends

Concord Comprehensive Safety Action Plan

Page 14 ends

Existing Plans, Policies & Processes
This chapter inventories the existing plans, policies, projects, and programs reviewed in the development of the City of Concord Comprehensive Safety Action Plan (CSAP). The review ensures that the CSAP’s vision, goals, and Safe System strategies are aligned with prior planning efforts, planned transportation projects, and established community safety programs. The documents reviewed are as follows:

The following sections include brief descriptions of these documents and how they inform the development of the CSAP.

A detailed list of goals, objectives and relevant policies from the reviewed information is listed in Appendix B, while a list of road safety related improvements and projects are listed in Appendix C.

1. Safe Trips to BART: An Action Plan for Safer Roadways (2025)

2. Five-Year Capital Improvement Plan FY2025-FY2029 (2024)

3. Contra Costa County Complete Streets Safety Assessment (2024)

4. Pine Hollow Road Complete Streets Feasibility Study (2023)

5. Concord Local Roadway Safety Plan (2022)

6. City of Concord Complete Streets Feasibility Study: Willow Pass Road, Galindo Street & Cowell Road (2020)

7. Monument Corridor Community-Based Transportation Plan (2019)

8. Bicycle, Pedestrian & Safe Routes to Transit Plan (2016)

9. Downtown Corridors Plan (2016)

10. Concord 2030 General Plan - Transportation Element (2015)

11. Concord Complete Streets Study (2014)

12. Downtown Specific Plan (2014)

13. Citywide Climate Action Plan (2013)

14. Concord Trails Master Plan (2002)

Page 26 of 363 ends

Concord Comprehensive Safety Action Plan

Page 15 ends

This regional roadway safety action plan was developed by the San Francisco Bay Area Rapid Transit District (BART). It is the first plan of its kind developed by a transit operator in the United States. Guided by the Safe System Approach, the plan analyzed five years of injury crash data (2019–2023) on public streets surrounding all 48 non-airport BART stations across five Bay Area counties to identify a system wide High Injury Network (HIN). The plan produced a four- tier Systemic Roadway Safety Measures Toolbox of more than 30 engineering countermeasures aligned with the FHWA Safe System Roadway Design Hierarchy, and developed Focus Station Area Action Plans (FSAAPs) for seven representative stations, including Concord.

The Five-Year Capital Improvement Plan (CIP) FY2025–FY2029, adopted by City Council in June 2024, provides the financial and programmatic framework for implementing CSAP strategies through capital investments in transportation infrastructure. The CIP evaluation criteria explicitly prioritize projects that implement Complete Streets policy goals and Climate Action Plan strategies, ensuring the systematic integration of safety considerations into all capital planning decisions.

The Contra Costa County Complete Streets Safety Assessment (CSSA), conducted by UC Berkeley SafeTREC, evaluates pedestrian and bicycle safety along Concord Avenue from Contra Costa Boulevard to downtown Concord.

The assessment applies the Safe System Approach, integrating safe road users, safe vehicles, safe speeds, safe roads, and post-crash care. Through crash data analysis, policy benchmarking, and field audits of three focus areas, the CSSA identifies infrastructure countermeasures including Leading Pedestrian Intervals, protected left turns, roundabouts, medians, and enhanced crossings.

The Concord FSAAP directly supports the CSAP by identifying six priority locations on HIN corridors. For each location, the FSAAP provides site-specific countermeasure recommendations organized by Safe System tier with capital cost estimates, offering a ready implementation framework consistent with the CSAP’s Safe System approach. The plan’s system wide finding that arterials and higher-speed roads disproportionately concentrate KSI collisions aligns directly with the CSAP’s goals of targeting investment on high-injury corridors. The plan also provides a documented regional evidence base the City can reference when pursuing federal and state safety grant funding to implement CSAP projects.

The CIP includes dedicated programs that directly advance CSAP objectives, including the School Safety Assessment Program addressing infrastructure conditions at all 50 schools citywide, the street lighting and safety improvement project, and the traffic safety and traffic calming program providing systemic solutions for high-risk areas. These programmatic investments complement project-specific safety improvements across the bicycle and pedestrian network, creating a comprehensive capital framework that translates the CSAP’s vision and goals into funded infrastructure improvements over the five-year planning horizon.

This assessment directly advances CSAP strategies by addressing crossing barriers at I-680 and SR-242, implementing traffic calming through lane narrowing, providing separated bicycle facilities, and enhancing signalized intersection safety. The CSSA’s alignment with the County Vision Zero Resolution adopted in December 2023 demonstrates the regional coordination essential to CSAP success.

Safe Trips to Bart: An Action Plan for Safer Roadways (2025) Five-Year Capital Improvement Plan FY2025-FY2029 (2024) Contra Costa County Complete Streets Safety Assessment (2024) CSAP RelevanceCSAP RelevanceCSAP Relevance

Page 27 of 363 ends

Concord Comprehensive Safety Action Plan

Page 16 ends

CSAP RelevanceCSAP RelevanceCSAP Relevance
The Pine Hollow Road Complete Streets Feasibility Study addresses a critical 2.2- mile corridor segment from Clayton Valley Charter High School to Mount Diablo Elementary School. The study was identified in the City’s Bicycle, Pedestrian and Safe Routes to Transit Plan (2016) as a priority corridor lacking continuous sidewalks or bike lanes and facing challenges from high traffic speeds, heavy truck traffic, and frequent collisions. The study conducted extensive stakeholder engagement, analyzed existing corridor conditions, and recommended innovative and context-sensitive multimodal improvements to enhance bicycle and pedestrian safety, improve auto circulation, enhance trail connectivity, and improve residential and school access.

The Concord Local Roadway Safety Plan (LRSP) provides a systematic, data- driven approach to identifying roadway safety issues and developing targeted countermeasures to reduce fatal and serious injury (KSI) collisions. The LRSP analyzed collision data, identified high-risk locations, and developed emphasis areas focused on Safe System elements including safe road users, safe vehicles, safe speeds, safe roads, and post-crash care. The LRSP establishes a framework to systematically identify and analyze safety problems and recommend improvements following the Safe System approach, which acknowledges that human error is inevitable and designs the road system to minimize the serious consequences of collisions.

The Complete Streets Feasibility Study, completed in February 2020 with Caltrans funding, develops design concepts for 2.4 miles of Willow Pass Road, 1.2 miles of Galindo Street, and 2.1 miles of Cowell Road. The study provides engineering analysis and community-driven recommendations applying complete streets principles including travel lane narrowing to 10–11 feet, widened sidewalks, separated bicycle facilities, curb extensions, green infrastructure, street trees at 25–30 foot spacing, and improved signal timing.

This feasibility study exemplifies the CSAP’s comprehensive approach to corridor safety by addressing multiple modes of transportation, prioritizing vulnerable users near schools, and incorporating community input into design solutions. The study’s focus on complete streets principles and accessibility improvements directly supports the CSAP’s Safe System approach and demonstrates the City’s commitment to the systematic evaluation and improvement of high-priority corridors identified through data analysis and community concern.

The LRSP serves as a critical foundation document for the CSAP, providing detailed collision analysis, proven countermeasures, and implementation roadmaps that directly support the CSAP’s goals. The CSAP builds upon the LRSP’s data-driven approach while expanding its scope to include comprehensive community safetyw analysis, and broader stakeholder and public engagement consistent with SS4A program requirements. The LRSP’s emphasis on Vision Zero principles and the Safe System approach provides the philosophical and technical foundation for the CSAP’s comprehensive safety strategy.

This study supports the CSAP through phased implementation leveraging existing CIP repaving projects, medium-term network connectivity improvements, and long-term road diets converting vehicle capacity to pedestrian and bicycle space. The community engagement process provides a model for incorporating resident priorities into CSAP implementation while addressing documented safety needs.

Pine Hollow Road Complete Streets Feasibility Study (2023) Concord Local Roadway Safety Plan (2022)
City Of Concord Complete Streets Feasibility Study:

Willow Pass Road, Galindo Street & Cowell Road (2020)

Page 28 of 363 ends

Concord Comprehensive Safety Action Plan

Page 17 ends

CSAP RelevanceCSAP RelevanceCSAP Relevance
The Monument Corridor Community-Based Transportation Plan addresses mobility and accessibility challenges along a key corridor in the City of Concord. The plan identified several mobility goals, with community concerns focused specifically on bicycle and pedestrian safety. Users of active transportation are disproportionately affected by collisions in the study area.

Drawing on extensive public feedback, the plan recommends comprehensive actions to improve transportation safety, including Safe Routes to School improvements, enhanced crossings, traffic signal coordination, sidewalk gap closure, commercial driveway consolidation, separated bikeways, wayfinding signage, and volunteer driver programs.

The Bicycle, Pedestrian & Safe Routes to Transit Plan establishes a 20-year vision for improving the walking and bicycling environment throughout Concord.

To achieve a safe and efficient multimodal transportation system, the City recognizes that new streets will need to be developed and existing streets selectively retrofitted through road diets, lane narrowing, traffic calming, and other safety improvements. The plan places safety as its highest priority, developing project recommendations that address known safety challenges based on available collision data. The plan prioritizes travel safety for all modes of transportation and designs active transportation projects that are accessible and comfortable for people of all ages and abilities.

The Downtown Corridors Plan focuses on revitalizing Concord’s downtown area by enhancing three critical corridors: Oak Street, Grant Street from Oak Street to Salvio Street, and Salvio Street from Grant Street to Broadway. These corridors form the eastern half of the green frame conceptualized in the Downtown Specific Plan. The plan aims to improve key pedestrian and bicycle connections between Todos Santos Plaza, employment centers, residential neighborhoods, and regional transit. The design applies familiar materials while establishing more consistent standards, better legibility and accessibility, and improved safety for all users.

This community-based plan demonstrates the CSAP’s commitment to engaging directly with residents and addressing their specific safety concerns. The plan’s emphasis on protecting vulnerable users, particularly pedestrians and cyclists, aligns with Safe System principles and provides a model for comprehensive corridor improvements that balance multiple transportation modes while prioritizing safety. The plan’s recommendations for infrastructure improvements combined with educational and enforcement programs support the CSAP’s multifaceted approach to transportation safety.

This comprehensive plan provides the strategic framework for the CSAP’s active transportation safety goals. The plan’s commitments to regularly reviewing collision data, prioritizing improvements at high-injury intersections and corridors, implementing enforcement and education campaigns, and applying designs that emphasize safety and comfort for vulnerable users directly support the CSAP’s Safe System approach.

The plan’s emphasis on creating a complete and convenient active transportation network provides the infrastructure foundation necessary to achieve Vision Zero objectives while promoting sustainable transportation choices throughout the community.

This corridor-specific plan demonstrates how the CSAP’s comprehensive safety approach can be applied to enhance the pedestrian environment in downtown areas. The plan’s focus on improving connections to transit, employment, and community destinations while prioritizing safety and accessibility directly supports the CSAP’s goals of creating a walkable, bikeable community. The conceptual streetscape plans provide a guide for implementing Safe System infrastructure that transforms the public right- of-way to support safe, sustainable transportation while fostering economic development and community vitality.

Monument Corridor Community-Based Transportation Plan (2019) Bicycle, Pedestrian & Safe Routes to Transit Plan (2016) Downtown Corridors Plan (2016)

Page 29 of 363 ends

Concord Comprehensive Safety Action Plan

Page 18 ends

CSAP RelevanceCSAP RelevanceCSAP Relevance
The Transportation Element of the Concord 2030 General Plan, amended in 2015, provides comprehensive guidance to ensure that people and goods can safely and efficiently move within Concord and connect to the regional transportation system. The Element defines clear priorities within the transportation system, placing pedestrians and cyclists first and prioritizing pedestrian facilities above dedicated bicycle facilities, and both above street trees and parking. The Element incorporates complete streets policies as required by state law, recognizing that roads should be designed to meet the needs of multiple users including motorists, bicyclists, pedestrians, transit users, and persons of different physical capabilities.

The Concord Complete Streets Study provides comprehensive analysis and recommendations for implementing complete streets principles throughout the City. The study examined existing conditions, analyzed collision data from the Transportation Injury Mapping System (TIMS) for pedestrian and bicycle collisions, identified twelve target intersections for safety improvements, and developed specific design recommendations.

The Downtown Specific Plan, adopted in 2014 and amended in 2021, articulates a comprehensive vision to revitalize Downtown Concord and accommodate growth in future population and employment. As a designated Priority Development Area and BART Station Planning Area, Downtown Concord represents a critical opportunity for transit-oriented development. The plan contains specific circulation objectives including developing a green street framework, designing and constructing streets that integrate green streets principles supporting pedestrian, biking, transit, and green infrastructure, and improving access to and from the Downtown Concord BART Station.

This foundational planning document establishes the policy framework that guides all transportation planning and implementation in Concord.

The Element’s clear prioritization of vulnerable users, commitment to complete streets principles, and emphasis on multimodal transportation provide the overarching policy foundation for the CSAP. The specific policies addressing pedestrian circulation, bicycle network development, traffic calming, and safe routes to schools create the regulatory and planning framework necessary to systematically implement the CSAP’s comprehensive safety strategies while ensuring consistency with broader community planning goals.

This study provides detailed technical analysis and specific design solutions that support the CSAP’s implementation strategy. The study’s recommendations for establishing clear ADA accessibility plans, evaluating lower-volume streets as boulevards, implementing consistent bike lanes and sharrows, and creating programs to educate residents and foster a culture of active transportation directly inform the CSAP’s comprehensive approach. The collision data analysis and identification of high-priority intersections provide a data-driven foundation for targeting safety improvements where they are needed most.

This specific plan provides the land use and development framework that supports the CSAP’s comprehensive safety goals. By promoting higher- density, mixed-use development around transit stations and creating walkable, bikeable environments, the plan reduces vehicle miles traveled and creates opportunities for safe active transportation. The plan’s complete streets approach and emphasis on multimodal connectivity directly support the CSAP’s Vision Zero objectives while advancing broader community goals related to economic development, environmental sustainability, and quality of life.

Concord 2030 General Plan - Transportation Element (Amended 2015) Concord Complete Streets Study (2014)
Concord Downtown Specific Plan (2014)

Page 30 of 363 ends

Concord Comprehensive Safety Action Plan

Page 19 ends

CSAP RelevanceCSAP Relevance
The Citywide Climate Action Plan is a comprehensive community document that measures and monitors locally-generated greenhouse gas emissions trends. The plan includes Transportation Systems and Land Use strategies that make incremental, long-term improvements to expand viable transportation options within Concord and improve the energy efficiency of motor vehicle infrastructure. Key strategies include developing pedestrian and bicycle master plans consistent with Complete Streets standards, prioritizing traffic enforcement to protect cyclists and pedestrians, implementing traffic calming measures, creating comprehensive Safe Routes to Schools programs, and implementing complete streets projects that prioritize active transportation users.

The Concord Trails Master Plan establishes a comprehensive network for recreation and alternative transportation modes including hiking, biking, and equestrian use. The plan identifies the need for providing access to BART stations, historic walking tours, new bridges, and filling roadway gaps. The trails are designed to serve multiple purposes including outdoor recreation, transportation for commuters, public health, education, social and economic well-being, and alternative emergency access.

This climate action plan demonstrates how transportation safety improvements directly support broader environmental sustainability goals. The plan’s emphasis on expanding active transportation options, implementing traffic calming, and creating complete streets directly aligns with the CSAP’s Safe System approach while addressing climate change mitigation. By reducing vehicle miles traveled through safe, attractive alternatives for walking and cycling, these strategies advance both Vision Zero objectives and greenhouse gas reduction targets by demonstrating the compounded benefits of comprehensive transportation safety investment.

This trails master plan provides the foundation for developing a comprehensive off-street active transportation network that complements on-street bicycle and pedestrian facilities. The plan’s emphasis on connecting trails to transit, schools, and community destinations while providing safe, grade-separated crossings of major barriers supports the CSAP’s comprehensive approach to transportation safety. By creating attractive, safe alternatives to driving for both recreation and transportation, the trails network advances Vision Zero objectives while enhancing community health, quality of life, and environmental sustainability.

Citywide Climate Action Plan (2013)
Concord Trails Master Plan (2002)

Page 31 of 363 ends

CSAP
Safety Analysis &
High-Injury Network
Identification

CHAPTER THREE

Page 32 of 363 ends

Concord Comprehensive Safety Action Plan

Page 21 ends

The analysis applied a range of complementary techniques to evaluate collision patterns and contributing factors across multiple The CSAP employs a systematic, data-driven methodology to evaluate roadway safety conditions across the City of Concord. Five years of collision records were analyzed to identify trends, recurring patterns, and contributing factors affecting all categories of road users. The findings directly inform the identification of priority safety concerns and the development of targeted, evidence-based countermeasures.

This chapter presents the results of the safety analysis conducted for the City of Concord as part of the Comprehensive Safety Action Plan (CSAP). Grounded in the Safe Streets and Roads for All (SS4A) program requirements and the Safe System Approach, the analysis provides the technical foundation for identifying high-risk locations, understanding systemic safety patterns, and guiding the selection and prioritization of countermeasures.

The analysis is structured around three primary components: (1) collision analysis, (2) High-Injury Network (HIN) identification, and (3) development of collision profiles.

Collision data were drawn from three primary sources: the Transportation Injury Mapping System (TIMS), the Statewide Integrated Traffic Records System (SWITRS), and records maintained by the Concord Police Department. Police reports were used to supplement and validate individual collision details. Together, these sources yield a five-year dataset spanning January 1, 2021, through December 31, 2025, a sufficiently robust timeframe to evaluate long-term safety trends, seasonal patterns, and location-specific risk concentrations.

Drawing on the results of the collision analysis, the City identified a High-Injury Network (HIN) is a defined set of roadway segments and intersections where fatal and severe injury collisions are disproportionately concentrated. The HIN serves as the primary tool for directing safety investments and prioritizing targeted interventions toward the locations where the potential to reduce serious harm is greatest.

Collision profiles were developed to characterize recurring patterns in roadway incidents, capturing key dimensions including collision severity, mode involvement, and contributing factors. These profiles deepen the understanding of systemic safety challenges and directly inform the selection of countermeasures suited to specific collision types and roadway contexts.

The California Office of Traffic Safety (OTS) publishes annual rankings that enable cities to benchmark their traffic safety performance against peers of comparable population. These rankings are produced using an Empirical Bayesian methodology that accounts for population size, vehicle miles traveled, and collision frequency, providing a statistically grounded basis for comparison.

For 2023, the most recent year for which OTS rankings are available, Concord’s results identify several areas warranting focused attention:
• Pedestrian collisions (age 65 and older): 4th out of 62 cities • Speed-related collisions: 15th out of 62 cities
• Hit-and-run collisions: 16th out of 62 cities
• DUI collisions (drivers under age 21): 18th out of 62 cities A full list of all categories is posted on California OTS’s website. These rankings serve as high-level indicators of safety performance and are considered alongside the City’s own local collision analysis to inform planning priorities and funding strategies.

METHODOLOGY

DATA SOURCES

HIGH-INJURY NETWORK IDENTIFICATION

COLLISION PROFILES

OFFICE OF TRAFFIC SAFETY (OTS) RANKINGS
Collision Analysis
Severity Analysis: Classification of collisions by
severity, including fatal, severe injury, visible injury, and complaint of pain.

Temporal Trends: Evaluation of collision patterns by
year, month, day of week, and time of day.

Road User Analysis: Identification of vulnerable road
users, including pedestrians, bicyclists, and motorcyclists.

Demographics Analysis: Assessment of trends related
to age and gender of involved parties.

Collision Characteristics Analysis: Examination
of collision types, primary contributing factors,
roadway characteristics, lighting conditions, and
weather conditions.

Spatial Distribution Analysis: Use of Geographic
Information Systems (GIS) to map collision locations
and identify spatial patterns and clusters.
dimensions. The key components include:

Page 33 of 363 ends

Concord Comprehensive Safety Action Plan

Page 22 ends

Between January 1, 2021, and December 31, 2025, a total of 1,804 traffic collisions were reported within the City of Concord. Of these, 164 collisions (approximately 9
percent) involved fatal or severe injuries (KSI), including 19 fatal collisions and 145 severe injury collisions. An additional 427 collisions (24 percent) resulted in visible injuries, while the remaining 1,213 collisions (67 percent) were categorized as complaint of pain.

This distribution reinforces the importance of directing resources toward strategies that reduce both the
frequency and severity of collisions, with particular
emphasis on those resulting in fatal and serious injuries.

Figure below illustrates injury collisions by severity.

COLLISIONS BY SEVERITY
1,804
INJURY

COLLISIONS
19(1%)
145(8%)
1,213(67%)
427(24%)
0 1 Miles
Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 34 of 363 ends

Concord Comprehensive Safety Action Plan

Page 23 ends

41%
of all KSI on
5 corridors
Willow Pass (17), Clayton Rd (15),
Concord Ave, Monument & Treat (12 ea.)
87% at intersections
39%
of all KSI
in dark conditions
Late-night KSI rates reach 32–27% —
3–4× the 9.1% citywide average.
1 AM: 32% · 5 AM: 27%
85%
of KSI in clear weather —
not conditions, behavior
Speed, signals & turning each drive 23 KS
(42% combined). DUI rate: 14.4%.

Behavior is the primary factor
0 1 Miles

KSI COLLISIONS
164 events · 2021–2025
I
Fatal
Severe Injury

Page 35 of 363 ends

Concord Comprehensive Safety Action Plan

Page 24 ends

24.2%
KSI rate —

2.7× the citywide average
Veh/ped type: 24.3% KSI rate

42.3%
KSI rate — pedestrians
in dark conditions
Nearly 5× citywide avg. Monument Blvd,
Clayton Rd & Willow Pass Rd lead.
~27% of ped crashes in darkness

41.5%
KSI rate — highest
of any violation type
mid-block crossing gaps on arterials.

Exceeds DUI rate of 14.4%

SPEDESTRIAN COLLISIONS
190 total · 46 KSI · 24.2% KSI rate
0 1 Miles
Schools
Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 36 of 363 ends

Concord Comprehensive Safety Action Plan

Page 25 ends

14.1%
KSI rate —
55% above citywide avg

10.5% of all fatalities

20.8%
hit-and-run rate —
nearly 2× citywide
31 of 149 bicycle crashes involved
a hit-and-run departure.
89%
of bicycle KSI
at intersections
Broadside dominant. Fatal sites:

Willow Pass/Diamond · Concord Ave/New Dr.

Annual KSI rate: 2.8%–27% across 5 yrs

BICYCLE COLLISIONS
149 total · 21 KSI · 14.1% KSI rate
Schools
Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 37 of 363 ends

Concord Comprehensive Safety Action Plan

Page 26 ends

Yearly Trends Daily Trends
Hourly TrendsMonthly Trends
Fatal and serious injury (KSI) collisions peaked in 2022, with 39 incidents recorded, which is the highest annual total in the five-year study period. Both 2021 and 2025 followed with 34 KSI collisions each.

Total injury collisions rose from 315 in 2021 to a five-year peak of 383 in both 2022 and 2024, before declining to 341 in 2025. This year-to-year variability reflects the complexity of roadway safety and reinforces the case for sustained, data- informed interventions rather than single-point responses.

KSI collisions are most frequent on Mondays and Sundays, with 28 incidents recorded on each day over the study period.

Total injury collisions follow a different distribution, peaking on weekdays, with Thursday recording the highest volume at 310 collisions, while weekend totals are lower, with 235 on Saturday and 206 on Sunday.

This divergence between weekday and weekend patterns
reflects differences in travel volume and trip purpose.

Weekday commuting drives higher overall collision counts, while severe collisions are distributed more evenly across all days of the week, indicating that high-speed or high-risk travel behaviors are not limited to peak commute periods.

Both KSI and total injury collisions are most frequent during the afternoon and early evening hours. The period between 2:00 p.m. and 5:00 p.m. records the highest activity, with 36 KSI collisions and 420 injury collisions over the five-year study period.

This concentration aligns with the combined pressures
of afternoon commuter traffic and school dismissal trips which is a period of elevated roadway demand that warrants focused safety measures and targeted enforcement during peak hours.

KSI collisions are most frequent in June, with 19 incidents recorded over the five-year period, followed by August and December with 17 each.

Total injury collisions are broadly consistent across the calendar year, though a seasonal pattern is evident: collision frequency rises during the warmer months of May through October. Monthly totals range from a low of 126 in February to a peak of 165 in both September and October.

This seasonal pattern likely reflects the increase in travel activity, including recreational trips and pedestrian
and bicycle use during warmer months. This pattern
underscores the value of heightened safety outreach and targeted interventions timed to peak travel periods.

Collisions were categorized by location type to distinguish between intersection-related and mid-block incidents. Consistent with standard practice, any collision occurring within 250 feet of an intersection was classified as an intersection collision.

Of the 1,804 reported collisions, 1,518 (84 percent) occurred at or near intersections, with the remaining 286 (16 percent) occurring along mid-block segments. This pronounced concentration at intersections identifies them as the primary locus of collision risk in Concord and a central focus for safety investment. The table below summarizes injury collisions by severity and location type.

COLLISIONS BY LOCATION
Fatal 3 16 19
Severe Injury 19 126 145
Visible Injury 79 348 427
Complaint of Pain 185 1,028 1,213
Total 286 1,518 1,804
Roadway
Segment Intersection TotalCollision
Severity

Page 38 of 363 ends

Concord Comprehensive Safety Action Plan

Page 27 ends

12PM
Hourly Trends
Monthly Trends Daily TrendsYearly Trends
0 2022 2024
383
2023
382
28 29 34
2021
383
2025
315
34 39
341
Injury Collisions
KSI
Injury Collisions
KSI
Injury Collisions
KSI
Injury Collisions
KSI
0 Sun
206
235
Sat
26 1918
Fri
261
ThuWed
295
Tue
266
18 2828 27
Mon
231
310
0 Jan JunMar AugFeb JulApr Sep NovMay Oct Dec
150
163 165
154146
12 9
147
162
131 144
165
151
126
121510 13 16 13 1719 1711
12AM 1AM 2AM 3AM 4AM 5AM 6AM 7AM 8AM 9AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 11PM 0 1AM 2AM 3AM 4AM 5AM 6AM 7AM 8AM 9AM 10AM 11AM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM 7 13 118
4 87
25 3 10 46 4 6
16 10
12 767
118
154
15 83
111
148
130133
96 72
9592
80 113
23 52
34 11
6 5
83 88
33 0 1 0 3
87

Page 39 of 363 ends

Concord Comprehensive Safety Action Plan

Page 28 ends

Mode Collision Type
Passenger vehicles are the most frequently involved mode, accounting for 37 percent of KSI collisions and 71 percent of total injury collisions.

Vulnerable road users are significantly overrepresented in severe outcomes relative to their share of total collisions. Pedestrian-involved collisions account for 28 percent of KSI collisions while representing only 11 percent of all injury collisions. Bicyclists account for 13 percent of KSI collisions and 8 percent of injury collisions, and motorcyclists account for 19 percent of KSI collisions and 7 percent of injury collisions. In each case, the gap between KSI share and overall collision share reflects the heightened physical vulnerability of these road users in the event of a collision.

These results affirm the need for safety strategies that specifically address pedestrian, bicycle, and motorcycle safety, consistent with the Safe System Approach’s priority of protecting those most at risk of serious harm.

Broadside collisions are the most prevalent collision type, accounting for 29 percent of KSI collisions and 38 percent of all injury collisions, which shows a consistent pattern with Concord’s high concentration of collision activity at intersections.

Vehicle-pedestrian collisions account for 27 percent of KSI collisions which reflects the physical vulnerability of pedestrians and the severity of outcomes when they are involved in collisions. Rear-end collisions represent 25 percent of total injury collisions but only 10 percent of KSI collisions, indicating that while they are common, they tend to produce less severe outcomes than intersection-related conflict types.

Collisions involving vehicles striking fixed objects contribute 16 percent of KSI collisions and 9 percent of total injury collisions, representing a meaningful share of severe outcomes that warrants attention in roadway design and speed management strategies.

Taken together, these patterns point to the need for countermeasures that address intersection conflict, pedestrian exposure, and roadway departure risk, the three collision types responsible for the greatest share of fatal and severe injury outcomes in Concord.

COLLISION BY MODE

COLLISION BY COLLISION TYPE
1,804
Injury
Collisions
1,804
Injury
Collisions
164 KSI
Collisions
164 KSI
Collisions

Page 40 of 363 ends

Concord Comprehensive Safety Action Plan

Page 29 ends

Unsafe speed is the leading contributing factor in Concord collisions, associated with 14 percent of KSI collisions and 23 percent of all injury collisions. Traffic signal and sign violations are equally prevalent in severe collisions, contributing to 14 percent of KSI collisions and 16 percent of total injury collisions.

Improper turning movements account for 14 percent of KSI collisions and 15 percent of injury collisions, while automobile right-of-way violations contribute 11 percent of KSI and 13 percent of injury collisions. Driving under the influence (DUI) is implicated in 12 percent of KSI collisions and 8 percent of total injury collisions, which shows a disproportionate share given DUI’s share of all trips, underscoring its outsized role in serious collision outcomes.

Pedestrian violations account for 13 percent of KSI collisions, a figure that reflects the complexity of pedestrian-vehicle interactions and the shared responsibility between road users and system design in preventing serious outcomes.

The breadth and variety of contributing factors confirm that no single intervention will resolve Concord’s safety challenges. Effective improvement requires a coordinated combination of engineering measures, targeted enforcement, and public education, each addressing different behaviors and roadway conditions.

COLLISION BY VIOLATION CATEGORY
Violation Lighting
Most collisions occur during daylight hours, accounting for 56 percent of KSI collisions and 70 percent of total injury collisions, a reflection of the greater volume of travel that occurs in daylight rather than any protective quality of darkness.

Collisions under dark conditions with street lighting present a disproportionate risk: they account for 34 percent of KSI collisions while representing only 24 percent of injury collisions overall. This gap indicates that nighttime conditions meaningfully increase the severity risk of a collision even when street lighting is present, reinforcing the importance of roadway lighting quality, visibility enhancements, and treatments that reduce vehicle speeds during low-light hours.

COLLISION BY LIGHTING CONDITIONS
1,804
Injury
Collisions
164 KSI
Collisions
1,804
Injury
Collisions
164 KSI
Collisions

Page 41 of 363 ends

Concord Comprehensive Safety Action Plan

Page 30 ends

Weather
The overwhelming majority of collisions occurred under clear weather conditions, with 88 percent of KSI and 85 percent of all injury collisions.

Cloudy conditions account for 7 percent of both KSI and total injury collisions, while all other weather conditions contribute a minimal share.

The data confirm that adverse weather is not a primary driver of collision risk in Concord. Rather, collisions are concentrated under the everyday travel conditions that most residents experience most of the time, which reinforces the importance of systemic infrastructure improvements that perform under normal operating conditions, not just edge-case scenarios.

COLLISION BY WEATHER CONDITION
Moto Vehicle
Motor vehicle-to-motor vehicle incidents account for the largest share of collisions, with 39 percent of KSI and 65 percent of total injury collisions, reflecting the dominant role of vehicle-to-vehicle conflict in Concord’s collision landscape.

Pedestrian-involved collisions are strongly overrepresented in severe outcomes: they account for 27 percent of KSI collisions while comprising only 10 percent of total injury collisions. Collisions with fixed objects similarly punch above their weight, representing 16 percent of KSI collisions against 9 percent of total injury collisions.

Bicycle-involved collisions account for 11 percent of KSI and 8 percent of injury collisions. Across all vulnerable road user categories, the data consistently show a gap between collision frequency and collision severity, a pattern that directly informs the Safe System priority of designing the transportation network to protect those most at risk.

COLLISION BY MOTOR VEHICLE INVOLVED WITH
1,804
Injury
Collisions
164 KSI
Collisions
1,804
Injury
Collisions
164 KSI
Collisions

Page 42 of 363 ends

Concord Comprehensive Safety Action Plan

Page 31 ends

Age Group
Over the five-year study period, a total of 2,385 individuals were involved in injury collisions within the City of Concord, resulting in 20 fatalities and 2,365 reported injuries. Of those injuries, 152 were classified as severe, 473 as visible, and 1,740 as complaints of pain.

Age and gender data were unavailable for 103 individuals. Among those with complete records, adults aged 20 to 29 account for the largest share of those involved, at 425 individuals (19 percent), followed by those aged 30 to 39 with 404 individuals (18 percent) and those aged 40 to 49 with 346 individuals (15 percent).

Gender distribution is broadly balanced, with males accounting for 51 percent and females for 49 percent of involved individuals.

The concentration of collision involvement among working-age adults aged 20 to 49 is consistent with their higher rates of driving and active transportation use. This age distribution should inform both outreach strategies and the design of safety improvements along corridors most heavily used by this population.

INDIVIDUALS (VICTIMS) INVOLVED IN INJURY COLLISIONS
206 425
80 16484
Male Female
113
219
210
168
149
114
70 32
80 193
194 404
178 346
130 279
124 238
93 163
38 70
Numbers of Collisions
Below 15
15-19
50-59
20-29
60-69
30-39
70-79
40-49
80 & Above

Page 43 of 363 ends

Concord Comprehensive Safety Action Plan

Page 32 ends

The collision analysis culminates in the identification of Concord’s High-Injury Network (HIN) corridors and intersections where fatal and serious injury collisions are most heavily concentrated. Consistent with SS4A guidance and Safe System principles, the HIN provides the spatial framework for prioritizing safety investments and directing resources to locations where the potential for impact is greatest.

Collision locations were mapped and spatially analyzed using ArcGIS to identify areas of elevated KSI and total injury concentration. Each location was evaluated on both collision frequency and severity to ensure that the resulting network reflects the full spectrum of safety risk rather than volume alone.

The output of this analysis is a prioritized list of high-injury corridors and intersections that forms the foundation for the safety project recommendations in Chapter 6 and guides the allocation of limited resources toward locations with the greatest demonstrated need.

The resulting composite Safe System
score for Clayton Road is 11.36.

With a composite score of 11.36,
Clayton Road ranks as the highest-
priority corridor in the network. This
ranking reflects both its substantial
share of fatal and serious injury
collisions and its elevated involvement
of pedestrians and bicyclists, precisely
the combination of factors the Safe
System scoring methodology is
designed to surface.

For Clayton Road, the observed collision data includes:
• Fatal and serious injury (KSI) collisions: 16
• Total injury collisions: 224
• Intersection-related collisions: 208
• Pedestrian-involved collisions: 18
• Bicycle-involved collisions: 20
To identify and prioritize high-injury locations, the City applied a weighted ranking methodology consistent with Safe System principles and FHWA guidance. The approach is designed to reflect the dual priorities of reducing the most severe collisions and protecting vulnerable road users.

The scoring model draws on five collision indicators: KSI collisions, total injury collisions, intersection- related collisions, pedestrian-involved collisions, and bicycle-involved collisions. Each indicator carries a weight that reflects its relative importance to overall safety performance.

KSI collisions carry the highest weight of 30, reflecting the Safe System imperative to eliminate fatal and severe outcomes above all else. Pedestrian and bicycle collisions each receive a weight of 20, consistent with the elevated severity risk these users face. Total injury collisions are also weighted at 20 to capture overall safety performance, while intersection-related collisions receive a weight of 10.

To enable fair comparison across locations of different sizes and volumes, each indicator value is normalized proportionally: the count at each location is divided by the citywide total for that indicator, then multiplied by its assigned weight. The five weighted components are summed to produce a composite Safe System score for each corridor and intersection.

The Safe System score is calculated as follows:

METHODOLOGY
EXAMPLE CALCULATION – Clayton Road (Rank A)
High Injury Network
Locations are ranked by their composite score, with higher scores indicating a greater concentration of severe collisions and a correspondingly higher priority for safety investment.

This transparent, data-driven framework ensures that safety resources are directed to the locations where they can achieve the greatest reductions in fatalities and serious injuries, directly fulfilling SS4A program objectives and the core principles of the Safe System Approach.

These values were normalized using systemwide totals:
• Total KSI collisions: 164
• Total injury collisions: 1,804
• Total intersection collisions: 1,518
• Total pedestrian collisions: 190
• Total bicycle collisions: 149
Each component was weighted and calculated as follows:
• KSI contribution: (16 / 164) × 30 = 2.93
• Injury contribution: (224 / 1,804) × 20 = 2.48
• Intersection contribution: (208 / 1,518) × 10 = 1.37
• Pedestrian contribution: (18 / 190) × 20 = 1.89
• Bicycle contribution: (20 / 149) × 20 = 2.68

Page 44 of 363 ends

Concord Comprehensive Safety Action Plan

Page 33 ends

A Clayton Road: SR-242 to Washington Boulevard 3 13 57 151 16 224 208 18 20 11.36 B Monument Boulevard: Cowell Road to Mohr Lane 3 10 30 101 13 144 114 24 14 9.13 C Willow Pass Road: I-680 to Avila Road 1 16 29 135 17 181 153 16 9 9.02 D Concord Boulevard: Galindo Street to Yolanda Cir 1 9 45 104 10 159 150 9 10 6.87 E Treat Boulevard: Argonne Drive to Clayton Road 2 11 14 51 13 78 71 10 4 5.30 F Concord Avenue: John Glenn Drive to Salvio Street 1 11 17 49 12 78 67 5 7 4.97 G Meadow Lane: Market Street to Monument Boulevard 1 5 14 31 6 51 43 9 8 3.97 H Oak Grove Road: Monument Boulevard to Contra Costa Canal Trail 1 6 7 34 7 48 40 3 6 3.20 I Port Chicago Highway: Clayton Road to Bates Ave 1 7 18 40 8 66 52 4 1 3.09 J Cowell Road: Monument Boulevard to Ygnacio Valley Road 0 5 15 38 5 58 52 2 6 2.92 K Ygnacio Valley Road: Clayton Road to Cowell Road 1 6 13 35 7 55 42 3 2 2.75 L Galindo Street: Salvio Street to Cowell Road 0 2 12 46 2 60 60 5 3 2.36 M Market Street: Concord Avenue to Meadow Lane 0 1 7 28 1 36 30 4 5 1.87 N Detroit Avenue: Clayton Road to Whitman Road 0 1 8 31 1 40 27 6 2 1.70 O Diamond Boulevard: Willow Pass Road to Concord Avenue 1 1 8 36 2 46 30 4 1 1.63

FATAL SEVERE INJURYCORRIDOR NAMERANK OTHER VISIBLE
INJURY

COMPLAINT OF
PAIN
KSI

COLLISIONS

SAFE SYSTEM
SCORE

COLLISIONS

OCCURRED AT

INTERSECTIONS

BICYCLE COLLISIONSPEDESTRIAN

COLLISIONS
INJURY

COLLISIONS
The table below provides the list of top 15 high injury corridors within City of Concord, identified based on the collisions that occurred between January 1, 2021 and December 31, 2025.

Page 45 of 363 ends

Concord Comprehensive Safety Action Plan

Page 34 ends

0 1 Miles
The map illustrates the high injury corridors in City
of Concord.

A Clayton Road: SR-242 to Washington Boulevard
B Monument Boulevard: Cowell Road to Mohr Lane
C Willow Pass Road: I-680 to Avila Road
D Concord Boulevard: Galindo Street to Yolanda Cir
E Treat Boulevard: Argonne Drive to Clayton Road
F Concord Avenue: John Glenn Drive to Salvio Street
G Meadow Lane: Market Street to Monument Boulevard
H Oak Grove Road: Monument Boulevard to Contra Costa Canal Trail I Port Chicago Highway: Clayton Road to Bates Ave
J Cowell Road: Monument Boulevard to Ygnacio Valley Road K Ygnacio Valley Road: Clayton Road to Cowell Road
L Galindo Street: Salvio Street to Cowell Road
M Market Street: Concord Avenue to Meadow Lane
N Detroit Avenue: Clayton Road to Whitman Road
O Diamond Boulevard: Willow Pass Road to Concord Avenue Fatal
Severe Injury
Visible Injury
Complaint of Pain
HIN Corridor#

Page 46 of 363 ends

Concord Comprehensive Safety Action Plan

Page 35 ends

1 Market Street & Concord Avenue 0 0 6 26 0 32 1 1
2 Galindo Street & Clayton Road 1 0 5 21 1 27 2 0
3 Galindo Street & Concord Boulevard 0 1 6 19 1 26 3 2
4 Monument Boulevard & Meadow Lane 1 3 6 13 4 23 4 4
5 Treat Boulevard & Oak Grove Road 0 2 2 17 2 21 0 1
6 Clayton Road & Treat Boulevard 0 0 8 12 0 20 2 0
7 Willow Pass Road & I-680 0 1 2 13 1 16 1 0
8 Concord Boulevard & Farm Bureau Road 0 2 6 7 2 15 0 3 9 Concord Avenue & Salvio Street 0 3 1 9 3 13 3 1
10 Willow Pass Road & Farm Bureau Road 0 1 5 7 1 13 0 2 11 Willow Pass Road & Market Street 0 1 4 8 1 13 1 1
12 Monument Boulevard & Virginia Lane 0 1 2 10 1 13 4 2

FATAL SEVERE INJURYINTERSECTIONS NAMERANK OTHER VISIBLE INJURY

COMPLAINT OF
PAIN
KSI

COLLISIONS BICYCLE COLLISIONSPEDESTRIAN

COLLISIONS
INJURY

COLLISIONS
The table below provides the list of top 12 high injury intersections within City of Concord, identified based on the collisions that occurred between January 1, 2021 and December 31, 2025.

Page 47 of 363 ends

Concord Comprehensive Safety Action Plan

Page 36 ends

0 1 Miles
The map illustrates the high injury intersections in
City of Concord.
1 Market Street & Concord Avenue
2 Galindo Street & Clayton Road
3 Galindo Street & Concord Boulevard
4 Monument Boulevard & Meadow Lane
5 Treat Boulevard & Oak Grove Road
6 Clayton Road & Treat Boulevard
7 Willow Pass Road & I-680
8 Concord Boulevard & Farm Bureau Road
9 Concord Avenue & Salvio Street
10 Willow Pass Road & Farm Bureau Road
11 Willow Pass Road & Market Street
12 Monument Boulevard & Virginia Lane
Fatal
Severe Injury
Visible Injury
Complaint of Pain
HIN Intersection#

Page 48 of 363 ends

Concord Comprehensive Safety Action Plan

Page 37 ends

Collision profiles distill five years of collision data into a set of clearly defined, recurring safety patterns within the City of Concord. Each profile captures a distinct type of collision risk and serves as the analytical basis for selecting targeted countermeasures in the Comprehensive Safety Action Plan (CSAP).

Drawing on collision records from January 2021 through December 2025, the City identified consistent patterns in collision type, contributing factors, road user behavior, and roadway characteristics. These systemic patterns are the focus of the profiles, supporting countermeasure selection that addresses both collision frequency and severity across the network.

The profiles are designed to deepen understanding of the underlying causes of injury collisions and to anchor safety decision-making in evidence. By synthesizing trends across collision type, violation category, travel mode, location context, and lighting conditions, they surface the most effective and context-appropriate safety strategies for each identified risk area.

Rather than organizing safety issues by roadway classification, Concord’s profiles are developed on a citywide basis. This approach captures the most prevalent and severe patterns across the entire transportation network and allows the City to address systemic challenges that cut across roadway types and geographic areas.

Each collision profile is structured around four elements:
• Total number of injury collisions, including those involving fatal and serious injury (KSI) • Key collision trends, including collision types, violation factors, location characteristics, and lighting conditions
• Primary travel modes involved, such as motor vehicles, pedestrians, bicyclists, and motorcyclists • A geographic representation illustrating the spatial distribution of collisions associated with the profile
Together, these elements provide a complete picture of each safety challenge and the evidence base needed to identify effective countermeasures.

The analysis identified ten priority collision profiles representing the most significant and persistent safety challenges on Concord’s roadway network:

Collectively, these ten profiles define the safety priorities that shape every subsequent element of the CSAP, from infrastructure investments and project selection to education campaigns and enforcement strategies. By aligning resources with the conditions and behaviors most strongly associated with fatal and serious injury outcomes, the City can ensure that every safety dollar delivers the greatest possible reduction in harm.

Collision Profiles
Improve Safety at Intersections – 1,518 collisions
Reduce Nighttime Collisions – 544 collisions
Address Traffic Signal and Sign Violations – 292 collisions Reduce Broadside Collisions – 687 collisions
Reduce Rear-End Collisions – 450 collisions
Improve Pedestrian Safety – 190 collisions
Address Collisions Near Schools (within 0.25 miles) – 667 collisions Reduce Unsafe Speed-Related Collisions – 418 collisions Improve Bicycle Safety – 149 collisions
Reduce DUI-Related Collisions – 139 collisions
1 4
7 2
5 8
3 6
9 10

Page 49 of 363 ends

Concord Comprehensive Safety Action Plan

Page 38 ends

0 1 Miles

IMPROVE SAFETY AT

INTERSECTIONS
KSI Collisions 142
Injury Collisions 1,518
Collision Type
Broadside Collisions 607
Rear End Collisions 374
Violation Category
Unsafe Speed Collisions 340
Traffic Signs and Signals Violation Collisions 287
Lighting
Nighttime Collisions 457
Mode
Bicycle 133
Bus 9
Motorcycle 93
Others 6
Passenger Car or Pickup Truck 1,090
Pedestrian 163
Truck 24
The map illustrates the collisions that occurred
at intersections in the City of Concord between
January 1, 2021 and December 31, 2025.
1 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 50 of 363 ends

Concord Comprehensive Safety Action Plan

Page 39 ends

0 1 Miles

REDUCE BROADSIDE

COLLISIONS
KSI Collisions 47
Injury Collisions 687
Violation Category
Collisions at Intersections 607
Traffic Signs and Signals Collisions 253
Automobile Right-of-Way Collisions 190
Improper Turning Collisions 107
Lighting
Nighttime Collisions 179
Mode
Bicycle 89
Bus 6
Motorcycle 50
Others 3
Passenger Car or Pickup Truck 524
Pedestrian 3
Truck 12
The map illustrates the broadside collisions
in the City of Concord between January 1,
2021 and December 31, 2025.
2 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 51 of 363 ends

Concord Comprehensive Safety Action Plan

Page 40 ends

0 1 Miles

ADDRESS COLLISIONS NEAR

0.25 MILE OF SCHOOLS
KSI Collisions 57
Injury Collisions 667
Location Type
Collisions at Intersections 589
Collision Type
Broadside Collisions 243
Rear End Collisions 166
Violation Category
Unsafe Speed Collisions 155
Traffic Signs and Signals Violation Collisions 105
Lighting
Nighttime Collisions 197
Mode
Bicycle 52
Bus 3
Motorcycle 44
Others 4
Passenger Car or Pickup Truck 476
Pedestrian 70
Truck 18
The map illustrates the collisions that occurred within

0.25 miles of schools in the City of Concord between
January 1, 2021 and December 31, 2025.
3 Fatal
Severe Injury
Visible Injury
Complaint of Pain
Schools

Page 52 of 363 ends

Concord Comprehensive Safety Action Plan

Page 41 ends

0 1 Miles

REDUCE NIGHTTIME

COLLISIONS
KSI Collisions 71
Injury Collisions 544
Location Type
Collisions at Intersections 457
Collision Type
Broadside Collisions 179
Rear End Collisions 136
Violation Category
Unsafe Speed Collisions 122
DUI Collisions 107
Mode
Bicycle 33
Bus 1
Motorcycle 39
Others 1
Passenger Car or Pickup Truck 400
Pedestrian 60
Truck 10
The map illustrates the nighttime collisions in
the City of Concord between January 1, 2021 and
December 31, 2025.
4 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 53 of 363 ends

Concord Comprehensive Safety Action Plan

Page 42 ends

0 1 Miles

REDUCE REAR-END

COLLISIONS
KSI Collisions 16
Injury Collisions 450
Location Type
Collisions at Intersections 374
Violation Category
Unsafe Speed Collisions 292
Following Too Closely Collisions 59
Lighting
Nighttime Collisions 136
Mode
Bicycle 10
Bus 4
Motorcycle 16
Others 2
Passenger Car or Pickup Truck 406
Pedestrian 1
Truck 11
The map illustrates rear-end collisions in the
City of Concord between January 1, 2021 and
December 31, 2025.
5 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 54 of 363 ends

Concord Comprehensive Safety Action Plan

Page 43 ends

0 1 Miles

REDUCE UNSAFE SPEED-

RELATED COLLISIONS
KSI Collisions 23
Injury Collisions 418
Location Type
Collisions at Intersections 340
Collision Type
Rear End Collisions 292
Hit Object Collisions 48
Lighting
Nighttime Collisions 122
Mode
Bicycle 9
Bus 2
Motorcycle 24
Others 1
Passenger Car or Pickup Truck 355
Pedestrian 20
Truck 7
The map illustrates the unsafe speed collisions in
the City of Concord between January 1, 2021 and
December 31, 2025.
6 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 55 of 363 ends

Concord Comprehensive Safety Action Plan

Page 44 ends

0 1 Miles

ADDRESS TRAFFIC SIGNS AND

SIGNALS VIOLATIONS
KSI Collisions 23
Injury Collisions 292
Location Type
Collisions at Intersections 287
Collision Type
Broadside Collisions 253
Lighting
Nighttime Collisions 69
Mode
Bicycle 27
Bus 1
Motorcycle 15
Others 1
Passenger Car or Pickup Truck 235
Pedestrian 9
Truck 4
The map illustrates the collisions related to traffic signs and signals violations in the City of Concord between
January 1, 2021 and December 31, 2025.
7 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 56 of 363 ends

Concord Comprehensive Safety Action Plan

Page 45 ends

Fatal
Severe Injury
Visible Injury
Complaint of Pain
0 1 Miles

IMPROVE

PEDESTRIAN SAFETY
KSI Collisions 46
Injury Collisions 190
Location Type
Collisions at Intersections 163
Collision Type
Vehicle/Pedestrian Collisions 181
Violation Category
Pedestrian Right-of-Way Violations 75
Pedestrian Violations 48
Lighting
Nighttime Collisions 60
Mode
Pedestrian 190
The map illustrates the pedestrian-involved
collisions in the City of Concord between January 1,
2021 and December 31, 2025.
8

Page 57 of 363 ends

Concord Comprehensive Safety Action Plan

Page 46 ends

Fatal
Severe Injury
Visible Injury
Complaint of Pain
0 1 Miles

IMPROVE BICYCLE
SAFETY
KSI Collisions 21
Injury Collisions 149
Location Type
Collisions at Intersections 133
Collision Type
Broadside Collisions 89
Improper Turning Collisions 21
Violation Category
Traffic Signs and Signals Collisions 27
Wrong Side of Road Collisions 26
Automobile Right-of-Way Collisions 21
Lighting
Nighttime Collisions 33
Mode
Bicycle 149
The map illustrates the bicycle-involved collisions
in the City of Concord between January 1, 2021 and
December 31, 2025.
9

Page 58 of 363 ends

Concord Comprehensive Safety Action Plan

Page 47 ends

0 1 Miles

REDUCE DUI-RELATED

COLLISIONS
KSI Collisions 20
Injury Collisions 139
Location Type
Collisions at Intersections 113
Collision Type
Rear End Collisions 41
Hit Object Collisions 40
Broadside Collisions 23
Head-On Collisions 21
Lighting
Nighttime Collisions 107
Mode
Bicycle 1
Motorcycle 4
Passenger Car or Pickup Truck 129
Pedestrian 2
Truck 3
The map illustrates the collisions related to DUI
collisions in the City of Concord between January 1, 2021 and December 31, 2025.
10 Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 59 of 363 ends

Engagement &
Collaboration

CHAPTER FOUR
CSAP

Page 60 of 363 ends

Concord Comprehensive Safety Action Plan

Page 49 ends

The development of the Concord Comprehensive Safety Action Plan (CSAP) involved extensive community engagement and close collaboration with stakeholders and residents. Recognizing that traffic safety is a shared responsibility, the process prioritized input from community members, partner agencies, and local stakeholders to identify key concerns, validate technical analyses, and build support for recommended strategies. Incorporating lived experiences from those who use Concord’s streets daily is essential to both the safety analysis and the identification of priority projects.

The CSAP engagement program was designed to reach a broad cross-section of the community and included four primary components:

The following table summarizes all engagement activities.

OVERVIEW SUMMARY OF ENGAGEMENT AND OUTREACH ACTIVITIES
Steering Committee: Established to provide
technical oversight and stakeholder guidance
throughout the plan’s development.

Community Outreach Meetings: Three meetings
open to the public, offering opportunities for residents to learn about the project and share feedback.

Public Input Tools: A citywide online safety survey
and an interactive web-based mapping platform that
allowed residents to identify specific locations and
corridors of concern.

Project Website: A dedicated website
(concordsafestreets.org) that served as a central hub
for project information, planning documents, and
engagement opportunities throughout the process.

Project Website
A dedicated project website, concordsafestreets.org, was created to provide residents with ongoing access to CSAP information, planning documents, and survey and map input links throughout the planning process.

Launched in February
2026
Steering Committee Meeting #1
Virtual kickoff meeting with the CSAP Steering Committee to introduce project scope, review the Safe System Approach, and present preliminary collision data analysis findings.

February 23, 2026
Online Survey and Map Input Opens
Launch of the citywide online community safety survey and web-based public map input platform, allowing residents to submit safety concerns and identify specific locations of concern across the city.

March 11, 2026
Community Outreach Meeting #1 (In-
person)
In-person public meeting open to all Concord residents. Collision data analysis and preliminary High Injury Network findings were presented, and the survey and map input platform were introduced.

March 30, 2026
Community Outreach Meeting #2 (Virtual)
In a virtual public meeting, survey and map input results were presented alongside draft project recommendations, and residents provided direct feedback on proposed safety improvements.

April 13, 2026
Steering Committee Meeting #2
Virtual Steering Committee meeting to review engagement outcomes, High Injury Network findings, and draft safety project recommendations.

Guidance was provided on project prioritization and plan finalization.

April 14, 2026
Online Survey and Map Input Closes Engagement period closes. A total of 651 survey responses and 77 map input comments were collected over the online survey period. April 20, 2026 Steering Committee Meeting #3 Virtual Steering Committee meeting to present the Safety Project recommendations and solicit feedback from the Steering Committee. April 30, 2026 Community Outreach Meeting #3 Third Community Outreach meeting to present the Safety Project recommendations and solicit feedback from the residents. May 4, 2026 Bicycle & Pedestrian Advisory Committee
Meeting (In-person)
Bicycle and Pedestrian Advisory Committee (BPAC) meeting presenting the CSAP recommendations. May 6, 2026
Date(s)DescriptionActivity

Page 61 of 363 ends

Concord Comprehensive Safety Action Plan

Page 50 ends

COMMUNITY OUTREACH MEETING #1 PRESENTATION STEERING COMMITTEE MEETING #1 PRESENTATION Appendix D includes presentations of both community outreach meetings and steering committee meetings.

Page 62 of 363 ends

Concord Comprehensive Safety Action Plan

Page 51 ends

The Steering Committee was established as part of the Concord Comprehensive Safety Action Plan (CSAP) to provide technical oversight and stakeholder guidance throughout the plan’s development.

The committee brings together representatives from municipal departments, regional transportation agencies, emergency services, and local institutions to support a coordinated and collaborative approach to improving traffic safety in Concord.

The formation of the Steering Committee reflected the understanding that traffic safety is a shared responsibility that requires coordination across multiple agencies and disciplines. Representatives from the City of Concord Public Works Department, the Contra Costa Transportation Authority (CCTA), Bay Area Rapid Transit (BART), the Contra Costa County Fire Protection District, and the Mt. Diablo Unified School District were convened to contribute their expertise and perspectives. This structure allowed the City to draw on a broad range of institutional knowledge and resources to identify and advance strategies to reduce serious injuries and fatalities on Concord’s roadways.

During the preparation of the CSAP, the Steering Committee played a central role in providing policy direction and technical input. Members contributed insights related to infrastructure, transit operations, emergency response, and school travel safety, helping to develop a comprehensive understanding of Concord’s safety challenges. The committee’s diverse representation ensured that the action plan reflected a wide range of considerations, including capital improvements, corridor redesigns, education, enforcement, and emergency response coordination.

The following table lists Steering Committee members and their affiliated agencies.

A dedicated project website (concordsafestreets.org) was developed to provide residents with ongoing access to CSAP information throughout the planning process. The website served as a central hub for project materials, including a project overview, a preliminary collision analysis summary with an interactive collision map, links to the community survey and map-based input tools, and updates on the project schedule.

The website was promoted through City communication channels and partner agency networks to reach a broad cross-section of Concord residents and encourage participation in the planning process.

By providing accessible and up-to-date information, the website supported transparency and facilitated ongoing community engagement.

The following figure illustrates the project website homepage.

CSAP STEERING COMMITTEE PROJECT WEBSITE
Abhishek Parikh City of Concord Public Works Department Virendra Patel City of Concord Public Works Department, Project Manager Phalen Shwan City of Concord
Jesse Crawford City of Concord
Danielle Thomas Contra Costa County Fire Protection Department Pranjal Dixit Contra Costa County Transportation Authority (CCCTA) Kamla Parks Bay Area Rapid Transit (BART)
Melanie Koslow Mt. Diablo Unified School District

AGENCYREPRESENTATIVE

Page 63 of 363 ends

Concord Comprehensive Safety Action Plan

Page 52 ends

A web-based public map input platform was
made available to allow residents to identify
specific locations and corridors where they had
observed or experienced traffic safety issues.

The platform was open from March 11 to April 20,
2026.

A total of 77 map-based comments were
received during this period. Analysis of these
submissions resulted in 106 categorized safety
concern responses, as individual comments
often referenced multiple issue types. For
example, a single comment at a given location
might identify concerns related to speeding,
school safety, and inadequate street lighting,
with each concern categorized separately in the
analysis. All subsequent analysis in this section is
based on these 106 categorized responses.

The following map illustrates the locations of
all community input comments across the city.

Appendix E contains the complete log of map
input comments and their associated safety
concern categories.

ONLINE MAP INPUT PLATFORM
Bayview
Circle Park
Bayview
Circle Park
Sun
Terrace
ParkSun
Terrace
Park
Willow Pass
Community Park
Willow Pass
Community Park
John
F. Baldwin
Park
John
F. Baldwin
Park
Todos
Santos
Plaza
Todos
Santos
Plaza
Dave
Brubeck
Park
Dave
Brubeck
Park
Ellis Lake
ParkEllis Lake
Park
Meadow
Homes
Park
Meadow
Homes
Park
Markham
Nature Park
and Arboretum Markham
Nature Park
and Arboretum
Newhall
Community
Park
Newhall
Community
Park
Brazil
Quarry Park
Brazil
Quarry Park
Cambridge
Park
Cambridge
Park
Len Hester
Community
Park
Len Hester
Community
Park
BART
Linear
Park
BART
Linear
Park
El Dorado
Fields
El Dorado
Fields
Boatwright
Youth Sports
Complex
Boatwright
Youth Sports
Complex
Greater
Lime Ridge
Open SpaceGreater
Lime Ridge
Open Space
Rick Seers
Neighborhood
Park
Rick Seers
Neighborhood
Park
Krueger
Play
Fields
Krueger
Play
Fields
Bailey Road
Linear Park
Bailey Road
Linear Park
Pine Hollow
Estates
Pine Hollow
Estates
Centre
Concord
Centre
Concord
Concord
Civic
Center
Concord
Civic
Center
Greater
Lime Ridge
Open Space
Greater
Lime Ridge
Open Space
Hillcrest
Community
Park
Hillcrest
Community
Park
Concord
Community
Park
Concord
Community
Park
Lime
Ridge Open
Space
Lime
Ridge Open
Space
Ygnacio
Valley Park
Ygnacio
Valley Park
Iron Horse
Park
Iron Horse
Park
Bailey Road
Cowell Road
Ygnacio Valley Road
Fry Way
Detroit Avenue
Whitman Road
Diamond Boulevard
Olivera Road
Grant Street
Treat Boulevard
Solano Way
San Miguel Road
Oak Grove Road
Crystyl Ranch Drive
Larwin Avenue
Myrtle Drive
Minert Road
Pine Hollow Road
Farm Bureau Road
Arnold Industrial Way
Olive DriveTurtle Creek Road
West Street
Denkinger Road
Kirker Pass Road
Michigan Boulevard
Concord Avenue Clayton Way
East Street
Coventry Road
Citrus Avenue
Ramp
Concord Boulevard
Mohr Lane
Thornwood Drive
Bates Avenue
Lynwood Drive
Mesa Street
Hillsborough Drive
Landana Drive
Clayton Road
Parkside Drive
Sixth Street
Laguna Street
Market Street
Babel Lane
Kirkwood Drive
Alberta Way
Willow Pass Road
David Avenue
Chestnut Avenue
Meadow Lane
Concord Boulevard
Galaxy Way
Ayers RoadMonument Boulevard
Clayton Road
Marsh Drive
Port Chicago Highway
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Public Comments
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
0 1 Miles
Public Comments

Page 64 of 363 ends

Concord Comprehensive Safety Action Plan

Page 53 ends

The following figure provides a summary bar chart of the issue categories.

The highest concentration of comments was received along Willow Pass Road, Concord Boulevard, Treat Boulevard, and Monument Boulevard. These corridors are consistent with the High Injury Network segments identified through the CSAP collision data analysis.

Speeding was the most frequently cited concern, followed by unsafe or illegal parking and poor pavement conditions.

The following tables summarize the corridors receiving the greatest number of comments and the distribution of categorized responses by issue type.

Willow Pass Road 10
Concord Boulevard 7
Treat Boulevard 7
Monument Boulevard 6
Farm Bureau Road 5
Birch Avenue 4
Cowell Road 4
Bancroft Road 3
Crystyl Ranch Drive 3
Krona Lane 3
Morgo Drive 3
Sunshine Drive 3
Speeding 11 10.4%
Unsafe or Illegal Parking 10 9.4%
Pavement 9 8.5%
Bicycle Safety 8 7.5%
Pedestrian Safety 8 7.5%
Signal Timing 8 7.5%
Bike Lane (Request or Gap) 7 6.6%
Sidewalk (Gap or Request) 6 5.7%
Sign or Signal Violation 6 5.7%
Intersection Safety 4 3.8%
Street Racing 4 3.8%
Poor Visibility 3 2.8%
Bicycle Safety
Intersection Safety
Speeding
Street Racing
Sign/Signal Violation
Pedestrian Safety
Bike Lane
Signal Timing
Pavement
Unsafe/Illegal Parking or Parking Violation
Sidewalk
Willow Pass Road
Treat Boulevard
Concord Boulevard
Monument Boulevard
Farm Bureau Road
Birch Avenue
Cowell Road
Bancroft Road
Crystyl Ranch Drive
Krona Lane
Morgo Drive
Sunshine Drive
Note: This graph represents the top 12 corridors and top 11 issue categories from the map input survey responses. Note: 77 map input comments were received. Analysis yielded 106 categorized safety concern responses, as individual comments may address multiple distinct issue types. Percentages are calculated as a share of 106 total responses. 3 2 2 1
1 1 1 1 1
11 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1
1 1
1 1
1 1
1 1
1 1
2 22
Corridor Issue CategoryNumber of Comments # Responses
% of Total
Responses
MAP INPUT: TOP CORRIDORS

BY NUMBER OF COMMENTS
MAP INPUT: CATEGORIZED SAFETY

CONCERN RESPONSES BY ISSUE TYPE

Page 65 of 363 ends

Concord Comprehensive Safety Action Plan

Page 54 ends

An online community safety survey was administered citywide from March 11 to April 20, 2026, generating a total of 651 responses. The survey collected information on travel behavior, safety concerns, personal experiences with traffic incidents, school zone conditions, geographic priorities, and preferred safety improvements.

Key findings from the survey are summarized below. A complete tabulation of results, including cross-tabulation analyses by age, trip purpose, and collision experience, is provided in Appendix F.

COMMUNITY SAFETY SURVEY HIGHLIGHTS COMMUNITY SAFETY SURVEY: HIGHLIGHTS BY TOPIC Respondent
Profile
651 responses collected March 11 to April 20, 2026. 51 percent of respondents were aged 55 or older. 94 percent traveled primarily by personal vehicle, consistent with Concord's auto-oriented street network.

Top Safety
Concerns
Speeding (66 percent) and red-light running (60 percent) are the dominant concerns across all road user groups and represent the clearest, most consistent signal in the survey. Distracted driving (39 percent) and illegal or unsafe e-bike operations (24 percent) are the next most frequently cited concerns.

Pedestrian
Safety
Failure to yield at crosswalks (37 percent) and turning vehicle conflicts (32 percent) are the leading pedestrian safety concerns. Missing sidewalks (19 percent) and missing crossings (13 percent) indicate unmet infrastructure needs.

Bicycle Safety
Cyclists not following traffic rules ranked first (26 percent), followed by absence of bike lanes (18 percent), poor road conditions (15 percent), and no safe routes (12 percent). Multiple open-ended responses noted e-bikes operating on sidewalks, particularly near schools, and called for consistent enforcement of e-bike regulations.

Personal
Incident
Experience
74 percent of respondents reported direct personal experience with a traffic incident on Concord streets. Near-misses (30 percent) and witnessed collisions (30 percent) were most commonly reported, followed by direct collision involvement (11 percent). Only 26 percent reported no personal incident experience.

Time-of-Day
Risk
The afternoon period (3 PM to 6 PM) was the highest-risk window across all modes: 62 percent of drivers, 33 percent of pedestrians, and 26 percent of cyclists identified it as the most dangerous time. Morning commute hours (6 AM to 9 AM) and school hours were the next most-cited periods.

School Zone
Safety
72 percent of respondents expressed concern about school-area safety. Speeding near schools (41 percent), traffic backup at drop-off/ pick-up (36 percent), and double-parking blocking sight lines (29 percent) were the top driver issues. Drivers failing to yield to children (30 percent) and absence of a dedicated bike route to school (19 percent) were prominent pedestrian and bicycle concerns.

Priority
Improvements
Crash-prone intersections (54 percent) and commercial corridors (36 percent) were the most frequently selected geographic focus areas. Increased police enforcement (52 percent), pedestrian signal improvements (38 percent), and high-visibility crosswalks (34 percent) are the most requested interventions.

Behavior
Change
92 percent of respondents modified their travel behavior due to safety concerns. The most common adaptations were avoiding certain streets (32 percent), traveling more cautiously (30 percent), and avoiding certain times of day (30 percent). Corridors most frequently cited for avoidance included Ygnacio Valley Road, Clayton Road, and Treat Boulevard.

Key FindingTopic
Note: Survey data collected via the City of Concord CSAP public engagement platform, March 11–April 20, 2026. Total valid responses: 651. Survey used multi- select, single-select, and open-text question formats. Percentages for multi-select questions exceed 100% as respondents could select multiple options. Open-text responses were reviewed thematically; locations cited fewer than three times were noted but not individually tabulated. Analysis and report prepared by the Transportation Division, Public Works Department, City of Concord. 651
71%
74%
52%
Survey
Responses
Noted
School Zone
Traffic Safety
Concerns
Reported a
Traffic Incident
Experience
Identified
Enforcement as
Their Top
Requested
Improve-
ment

Page 66 of 363 ends

Concord Comprehensive Safety Action Plan

Page 55 ends

Engagement findings were directly integrated into the CSAP’s analytical and planning framework. Input from the community survey and map-based platform both corroborated and enriched the technical collision data analysis. Corridors most frequently identified by residents as areas of concern, including Willow Pass Road, Concord Boulevard, Treat Boulevard, and Monument Boulevard, align closely with the High Injury Network corridors identified through quantitative analysis. Consistent emphasis on issues such as speeding, intersection conflicts, crosswalk violations, and gaps in pedestrian and bicycle infrastructure across both engagement tools further reinforced these concerns as citywide priorities.

Steering Committee guidance helped ensure that engagement outcomes were interpreted within the context of existing plans, programs, and funding opportunities. This coordination supported the development of recommendations that were
feasible within the City’s capital improvement programming and grant funding framework. In addition, three community outreach meetings provided opportunities for the public to review and comment on draft findings and emerging project recommendations, allowing the planning team to refine
priorities through direct dialogue with residents prior to finalizing the CSAP.

HOW ENGAGEMENT & OUTREACH

INFORMED THE CSAP

KEY TAKEAWAYS
Enforcement is the most requested improvement across all contexts.

Speeding and red-light running are the most prevalent safety concerns.

Traffic safety issues are widely experienced by residents.

The afternoon peak period presents the greatest safety risk.

Residents are actively adapting their behavior in response to safety concerns.

It ranked as the top priority in every geographic category, including residential streets, intersections, school zones, and commercial corridors. Support for physical infrastructure improvements was also strong, with pedestrian signals and high-visibility crosswalks consistently ranking second and third.

These issues were cited across all road user groups and geographic areas, indicating that any effective safety strategy should prioritize these behaviors through both enforcement and engineering countermeasures.

Three out of four respondents reported having direct or indirect experience with a traffic incident on Concord streets, indicating that safety concerns are grounded in direct experience rather than perception alone.

Between 3:00 PM and 6:00 PM, the highest share of drivers, pedestrians, and cyclists reported elevated safety concerns. Targeting enforcement, signal operations, and school zone measures during peak periods would benefit the broadest range of users.

The 92 percent rate of behavioral changes, such as avoiding certain routes or shifting travel times, highlights a substantial, often unmeasured burden that extends beyond reported collision data. 1 2
3 4
5

Page 67 of 363 ends

Safe Street Toolkit

CHAPTER FIVE
CSAP

Page 68 of 363 ends

Concord Comprehensive Safety Action Plan

Page 57 ends

Consistent with SS4A guidance, the Toolkit supports a
multidisciplinary approach to safety that integrates Engineering, Enforcement, and Education strategies. While engineering countermeasures form the core of the Toolkit, complementary measures including targeted enforcement and public education campaigns are essential for addressing behavioral risk factors such as The Safe Streets Toolkit presents a comprehensive suite of safety countermeasures to support implementation of the CSAP. The countermeasures are drawn from evidence-based strategies identified by the Federal Highway Administration (FHWA), including the Crash Modification Factor (CMF) Clearinghouse and FHWA guidance documents related to roadway departure, intersection safety, and roadway safety analysis. A complete listing of FHWA Proven Safety Countermeasures is provided in Appendix X.

The Toolkit serves as a technical resource to guide the selection and application of safety treatments that address identified collision patterns and systemic risk factors across the City’s transportation network.

The Safe Streets Toolkit is designed as a flexible reference document rather than a prescriptive list of improvements. All countermeasures are supported by research and have demonstrated safety benefits; however, their applicability varies depending on site-specific conditions, community context, and implementation feasibility.

In accordance with the Safe System Approach, the Toolkit enables City staff to select context-sensitive countermeasures based on factors such as roadway characteristics, user needs, collision history, and available resources. Inclusion of a countermeasure in the Toolkit does not constitute a formal recommendation for implementation; rather, it provides a range of viable options to be considered during project development and design.

For ease of application, countermeasures are organized into the following categories:

Each countermeasure included in the Toolkit is characterized using a standardized set of evaluation criteria to support informed decision-making:

The Toolkit supports both location-specific and systemic safety improvements within Concord. By leveraging data from the High Injury Network (HIN) and broader collision analysis, City staff can identify appropriate countermeasures to address priority safety concerns while also proactively deploying treatments across similar roadway contexts.

The following sections present detailed descriptions of individual countermeasures and provide guidance on their applicability within the City of Concord.

COMPREHENSIVE SAFETY APPROACH

TOOLKIT PURPOSE & APPLICATION

ORGANIZATION OF COUNTERMEASURES

COUNTERMEASURE EVALUATION CRITERIA

APPLICATION IN CONCORD
speeding, impaired driving, distracted driving, and failure to yield.

Implementing these strategies will require coordination with law enforcement agencies, community organizations, and regional partners to ensure a comprehensive and effective response to identified safety challenges.

Signalized Intersections: Treatments applicable to
intersections controlled by traffic signals, including
signal timing modifications, enhanced signage and
pavement markings, and geometric improvements.

Collision Types Addressed: Identifies the types
of collisions the countermeasure is intended to
mitigate, such as all collisions, pedestrian and bicycle collisions, or nighttime crashes.

Unsignalized Intersections: Countermeasures
for stop-controlled or uncontrolled intersections,
including signal installation, roundabouts, and
improved signing and striping.

Crash Reduction Factor (CRF): Provides the expected
percentage reduction in collisions based on empirical
research and national studies.

Roadway Segments: Treatments designed to improve
safety along roadway corridors between intersections,
such as rumble strips, roadway lighting, guardrails, and geometric realignments.

Expected Service Life: Indicates the anticipated
functional lifespan of the countermeasure, typically
ranging from 10 to 20 years, before major rehabilitation or replacement is required.

Additional Countermeasures: Non-infrastructure
strategies, including education, enforcement, and
programmatic initiatives.

Systemic Implementation Potential: Assesses the
suitability of applying the countermeasure using a
systemic, risk-based approach across multiple locations, categorized as Very High, High, Medium, or Low.

Page 69 of 363 ends

Concord Comprehensive Safety Action Plan

Page 58 ends

Includes the installation of new
streetlights, upgraded lighting fixtures,
or the enhancement of existing
lighting to improve visibility for all road
users at intersections. This may involve
increasing the number of luminaires,
improving lighting levels, or adjusting
lighting patterns to enhance visibility
and safety for all road users.

Includes New LED lighting, signal back
plates, retro-reflective tape outlining
the back plates, or visors to increase
signal visibility, larger signal heads,
relocation of the signal heads, or
additional signal heads.

Includes adding phases, lengthening
clearance intervals, eliminating or
restricting higher-risk movements,
and coordinating signals at multiple
locations.

Add Intersection Lighting
Improve Signal Hardware:

Lenses, Back-Plates With
Retroreflective Borders,
Mounting, Size, And Number
Improve Signal Timing
(Coordination, Phases, Red,
Yellow, Or Operation)
Crash Type: Night Crash Type: All Crash Type: All
40% 15% 15%
Medium Very High Very High
20 10 10

CRFCRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SIGNALIZED INTERSECTION COUNTERMEASURES
Corridors that have a history of collisions
involving emergency response
vehicles. The target of this strategy is
signalized intersections where normal
traffic operations impede emergency
vehicles and where traffic conditions
create a potential for conflicts between
emergency and nonemergency
vehicles. These conflicts could lead
to almost any type of crash, due to
the potential for erratic maneuvers of
vehicles moving out of the paths of
emergency vehicles.

Intersections that do not currently have
a left turn lane or a related left-turn
phase that are experiencing a large
number of collisions. Many intersection
safety problems can be traced to
difficulties in accommodating left-
turning vehicles, in particular where
there is currently no accommodation
for left turning traffic. A key strategy
for minimizing collisions related to
left-turning vehicles (angle, rear-end,
sideswipe) is to provide exclusive
left-turn lanes and the appropriate
signal phasing, particularly on high-
volume and high-speed major-road
approaches.

Left turns are widely recognized as the
highest-risk movements at signalized
intersections. Providing Protected left-
turn phases for signalized intersections
with existing left turn pockets
significantly improve the safety for left-
turn maneuvers by removing the need
for the drivers to navigate through
gaps in oncoming/opposing through
vehicles.

Install Emergency Vehicle
Pre-Emption Systems
Install Left-Turn Lane And/Or
Add Turn Phase (Signal Has
No Left-Turn Lane or Phase
Before)
Provide Protected Left Turn
Phase (Left Turn Lane Already
Exists)
Crash Type: Emergency Vehicle Crash Type: All Crash Type: All 70% 55% 30%
High HighLow
10 20 20

CRF CRF CRF

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

Page 70 of 363 ends

Concord Comprehensive Safety Action Plan

Page 59 ends

Converting a signal to a mast arm
from a pedestal-mounted base
provides better visibility of intersection
signs and signals that aid the drivers’
advance perception of the upcoming
intersection. Visibility and clarity of the
signal should be improved without
creating additional confusion or
distraction for drivers.

Includes the installation of flashing
beacons (e.g., yellow beacons,
LED beacons) to alert drivers to an
upcoming signalized intersection or
stop sign. This provides drivers with
increased visual cues, allowing for
earlier identification of the upcoming
intersection and improved reaction
time.

Convert Signal to Mast Arm
(from Pedestal-Mounted)
Install Flashing Beacons as
Advance Warning
Crash Type: All Crash Type: All
30% 30%
Medium Medium
20 10
Signalized Intersections with high
pedestrian-generators nearby (e.g.
transit stops) may experience high
volumes of pedestrians J-walking
across the travel lanes at mid-block
locations instead of walking to the
intersection and waiting to cross
during the walk-phase.

Raised medians next to left turn lanes
at intersections offer a cost effective
means for reducing collisions and
improving operations at higher volume
intersections.

Ladder or zebra crosswalk markings
are added to an intersection to make
the crosswalk more visible and improve
yielding to pedestrians.

Install Pedestrian Median
Fencing on Approaches
Install raised median on
approaches High Visibility Crosswalk
Crash Type: P & B Crash Type: All Crash Type: All, P & B 35% 40%25%
3 Low
20 CRF CRF CRFCRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH
OPPORTUNITY High
20 Medium
Note: N/A refers to Not Applicable
Cellular Vehicle-to-Everything (C-V2X)
Roadside Units (RSUs) enable real-
time communication between
infrastructure and connected vehicles
to broadcast safety messages such
as signal phase and timing (SPaT),
intersection geometry (MAP), and
hazard alerts. RSUs mounted at
signalized intersections transmit
standardized safety messages to
equipped vehicles, enabling in-vehicle
warnings for red-light violations,
pedestrian presence, hard braking
events, and collision hazards. This
technology supports the USDOT’s
Safe System Approach by providing
an additional layer of safety beyond
physical infrastructure. C-V2X RSUs
are most effective when deployed at
high-risk intersections with a history
of fatalities or severe injuries and are
complementary to near-miss analytics
platforms. RSUs require fiber backhaul
connectivity and integration with the
traffic signal controller.

Connected Vehicle
Infrastructure (C-V2X
Roadside Units)
10 Crash Type: All
CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY
N/A
Medium

Page 71 of 363 ends

Concord Comprehensive Safety Action Plan

Page 60 ends

Collisions related to turning maneuvers
include angle, rear-end, pedestrian,
and sideswipe (involving opposing
left turns) type collisions. If any of
these crash types are an issue at an
intersection, restriction or elimination
of the turning maneuver may be the
best way to improve the safety of the
intersection.

The addition of LPI gives pedestrians
the opportunity to enter an intersection
3-7 seconds before vehicles are given
a green indication; only minor signal
timing alteration is required.

For signalized intersections that have
a significant crash problem, one
alternative to change the nature of
the intersection itself is to convert
the intersection into a roundabout.

Roundabouts can also be very
effective at intersections with complex
geometry and intersections with
frequent left-turn movements.

Create Directional Median
Openings to Allow (& Restrict)
Left-Turns & U-Turns (S.i.)
Convert Intersection to
Roundabout
Modify Signal Phasing
to Implement a Leading
Pedestrian Interval (LPI)
Crash Type: All Crash Type: All
50% 60% Varies
Medium Very High Low
20 10 20
Installing pedestrian countdown
signal heads at signalized pedestrian
crossings with walk/don’t walk
indicators, particularly at locations
with a history of pedestrian-vehicle
collisions, provides pedestrians with
a countdown of remaining crossing
time, encouraging safer and more
timely crossing decisions.

Accessible pedestrian signals provide
information in alternative formats such
as verbal message, audible tones and
vibrating surfaces to communicate
information on the status of pedestrian
crossing (Walk, Flashing Don’t Walk,
or Don’t Walk) to people who are
visually impaired. Speech messages
and wayfinding tones aid in navigation
to the pedestrian push button and
to the far side of the street. Speech
messages also aid sighted pedestrians
by alerting them to the pedestrian
signal indication changing from Don’t
Walk to Walk, reducing instances of
late crossings. Messaging that includes
street names aids in wayfinding and
orientation.

Signalized Intersections with no
marked crossing and pedestrian signal
heads, where pedestrians are known to
be crossing intersections that involve
significant turning movements.

They are especially important at
intersections with (1) multiphase traffic
signals, such as left-turn arrows and
split phases, (2) school crossings, and
(3) double-right or double-left turns.

At signalized intersections, pedestrian
crossings are often safer when the left
turns have protected phases that do
not overlap the pedestrian walk phase.

Install Pedestrian Countdown
Signal Heads
Accessible Pedestrian Signal
(APS) Install Pedestrian Crossing
Crash Type: All Crash Type: P & B Crash Type: P & BCrash Type: P & B 45% 25%25%
High
20 20 15
Very HighVery High

CRF CRFCRF CRFCRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

Page 72 of 363 ends

Concord Comprehensive Safety Action Plan

Page 61 ends

Pedestrian Scramble is a form
of pedestrian “WALK” phase at a
signalized intersection in which all
vehicular traffic is required to stop,
allowing pedestrians/bicyclists to
safely cross through the intersection
in any direction, including diagonally.

Pedestrian Scramble may be
considered at signalized intersections
with very high pedestrian/bicycle
volumes, e.g. in an urban business
district.

Installing an advance stop bar
before the crosswalk at signalized
intersections with marked crossings,
particularly where significant bicycle
and/or pedestrian volumes are known
to occur, helps to improve driver
compliance with the red light and
enhance pedestrian safety.

A designated, painted box at signalized
intersections that offers bicyclists
a multi-stage process to safely and
more visibly make a left turn across an
intersection from a bike lane.

Pedestrian Scramble Install Advance Stop Bar
Before Crosswalk Bicycle Turn Box
Crash Type: P & B Crash Type: P & B
40%
Very HighHigh
20 15%15%
10 10
Very High
Crash Type: P & B

CRFCRF CRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Overhead-mounted LED luminaires
that activate upon pedestrian
pushbutton press, providing
targeted crosswalk illumination
during pedestrian crossing phases.

Unlike static intersection lighting,
PPLS concentrates high-intensity
illumination directly on the crosswalk
zone only when a pedestrian is present,
providing a dynamic visual cue to
drivers that a pedestrian is actively
crossing. Particularly effective at
intersections with high percentages of
nighttime or dark-condition pedestrian
collisions. PPLS is most effective when
integrated with APS and LPI timing
to provide a coordinated pedestrian
safety package.

Extending the all-red clearance
interval adds additional time after
one phase ends and before the
conflicting phase begins, allowing
vehicles that entered the intersection
during the yellow change interval to
clear before cross-traffic receives a
green indication. This low-cost signal
timing adjustment is particularly
effective at wide intersections and
locations with a high proportion of
angle and red-light-running collisions.

It can be implemented with existing
signal hardware through controller
programming changes only.

AI-powered video analytics platforms
use computer vision and machine
learning to continuously monitor
intersection operations and detect
near-miss events, traffic conflicts,
and unsafe behaviors in real time.

These systems analyze multimodal
interactions between vehicles,
pedestrians, and bicyclists to generate
conflict heatmaps, identify root
causes of recurring safety issues,
and quantify risk before collisions
occur. Near-miss analytics provide a
proactive, data-driven foundation for
selecting and prioritizing engineering
countermeasures, validating the
effectiveness of implemented safety
treatments, and supporting grant
applications with quantitative safety
evidence. Systems can integrate with
existing traffic cameras or deploy
dedicated sensors, and typically
include automated signal performance
measures (ATSPM) and dashboard
reporting capabilities.

Pushbutton-Activated
Pedestrian Lighting System
(PPLS)
All-Red Clearance Interval
Extension
Near-Miss Video Analytics
Platform
Crash Type: P & B / Nighttime
Very HighHigh
15 15%40%
10 10
Very High
Crash Type: AllCrash Type: All
N/A
Note: N/A refers to Not Applicable

Page 73 of 363 ends

Concord Comprehensive Safety Action Plan

Page 62 ends

CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

NON-SIGNALIZED INTERSECTION COUNTERMEASURES
Intersections that have a high
frequency of right-angle and left-
turn type collisions. Whether such
intersections have existing crash
patterns or not, a roundabout provides
an alternative to signalization.

The primary target locations for
roundabouts should be moderate-
volume unsignalized intersections.

Installing/upgrading larger or
additional stop signs or other
intersection warning/regulatory signs
at or prior to intersections will enhance
the ability of approaching drivers
to perceive them, improving driver
awareness and reducing the risk of
collisions.

Upgrading intersection pavement
markings, which typically includes the
addition of “Stop Ahead” markings,
centerlines, and stop bars, can improve
driver guidance, reduce confusion,
and enhance overall safety at the
intersection.

Convert Intersection to
Roundabout or Mini-
Roundabout
Install/Upgrade Larger or
Additional Stop Signs or
Other Intersection Warning/
Regulatory Signs
Upgrade Intersection
Pavement Markings
Crash Type: All Crash Type: All
Very HighLow
20 25%15%
10 10
Very High
Crash Type: All
Varies
Advance pedestrian warning systems
are activated signs installed upstream
(typically 100–150 feet) of a marked
crosswalk to alert approaching drivers that
a pedestrian is actively in the crosswalk
ahead. Activated by pushbutton, passive
infrared detection, or radar-based
pedestrian sensing, these systems display
flashing W11-2 pedestrian warning signs
with “AHEAD” or distance supplemental
plaques and/or LED-enhanced border
lighting. They are especially effective
on multilane roads where a driver in a
far travel lane may not see a pedestrian
already crossing in front of a stopped
vehicle in a near lane (the “multiple-threat”
scenario). Per MUTCD guidance, advance
RRFBs may also be installed upstream of
the crosswalk to supplement the warning
when sight distance is limited. These
systems are applicable at both signalized
and unsignalized crossings and are distinct
from static pedestrian warning signs by
providing a dynamic, real-time alert only
when a pedestrian is present.

Unsignalized intersection locations
that have a crash history and have
no controls on the major roadway
approaches. However, all-way stop
control is suitable only at intersections
with moderate and relatively balanced
volume levels on the intersection
approaches. Under other conditions,
the use of all-way stop control may
create unnecessary delays and
aggressive driver behavior.

Advance Pedestrian Warning
System (Activated)
Convert to all-way STOP
control (from 2-way or Yield
control)
Crash Type: P & B
40%
High
20 50%
10 High
Crash Type: All

CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Note: N/A refers to Not Applicable
Reduced left-turn conflict intersections
are geometric designs that alter how
left-turn movements occur in order
to simplify decisions and minimize
the potential for related collisions.

Two highly effective designs that rely
on U-turns to complete certain left-
turn movements are known as the
restricted crossing U-turn (RCUT) and
the median U-turn (MUT).

Reduced Left-Turn Conflict
Intersections
Crash Type: All
20 50%CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY
Medium

Page 74 of 363 ends

Concord Comprehensive Safety Action Plan

Page 63 ends

Flashing beacons can reinforce driver
awareness of the Non-Signalized
intersection control and can help
mitigate patterns of right-angle
collisions related to stop sign violations.

Post-mounted advanced flashing
beacons or overhead flashing beacons
can be used at stop-controlled
intersections to supplement and call
driver attention to stop signs.

Installing flashing beacons as advance
warning, such as yellow beacons, to
call drivers’ attention to intersection
control signs, provides increased visual
cues and improves driver awareness of
upcoming intersections.

Curb Extensions (also called Bulb-outs)
extend the sidewalk into the parking
lane at intersections, narrowing the
effective street width and shortening
pedestrian crossing distances. This
countermeasure improves pedestrian
visibility by positioning waiting
pedestrians at the edge of the parking
lane, slows turning vehicle speeds by
reducing corner radii, and reduces
pedestrian exposure time when
crossing the roadway. Bulb-outs also
provide additional space for accessible
curb ramps and prevent parking
encroachment on crosswalks.

Install Flashing Beacons at
Stop-Controlled Intersections
Install Flashing Beacons as
Advance Warning Curb Extensions/Bulb-outs
Crash Type: All Crash Type: All Crash Type: Pedestrian
30% 30%15%
10 10 20
HighHigh
Unsignalized intersections with
restricted sight distance and patterns
of collisions related to lack of sight
distance where sight distance can
be improved by clearing roadside
obstructions without major
reconstruction of the roadway.

Improve Sight Distance to
Intersection (Clear Sight
Triangles)
Crash Type: All
10 The installation of a splitter island
allows for the addition of a stop sign in
the median to make the intersection
more conspicuous.

Many collisions at unsignalized
intersections are related to right-
turn maneuvers. A key strategy
for minimizing such collisions is to
provide exclusive right-turn lanes,
particularly on high-volume and high-
speed major-road approaches. When
considering new right-turn lanes,
potential impacts to non-motorized
users should be considered and
mitigated as appropriate.

Install Splitter-Islands on The
Minor Road Approaches Install Right-Turn Lane
Crash Type: All Crash Type: All
40%55% 20%
Low
20 20
Medium MediumMedium

CRFCRF CRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

Page 75 of 363 ends

Concord Comprehensive Safety Action Plan

Page 64 ends

Intersections that have a long
pedestrian crossing distance, a
higher number of pedestrians, or a
crash history may benefit from the
installation of raised medians/ refuge
islands. Raised medians/refuge islands
decrease the level of exposure for
pedestrians and allow pedestrians
to concentrate on (or cross) only one
direction of traffic at a time.

Installing pedestrian crossings
at uncontrolled locations where
pedestrians are known to cross
intersections involving significant
vehicular traffic, particularly at school
crossings and intersections with right
and/or left-turn pockets, improves
pedestrian safety by providing
designated crossing areas and
enhancing driver awareness.

Many collisions at unsignalized
intersections are related to left-
turn maneuvers. A key strategy for
minimizing such collisions is to provide
exclusive left-turn lanes, particularly on
high-volume and high-speed major-
road approaches. When considering
new left-turn lanes, potential impacts
to non-motorized users should
be considered and mitigated as
appropriate.

Install Raised Medians /
Refuge Islands
Install Pedestrian Crossing at
Uncontrolled Locations
Install Left-Turn Lane (Where
No Left-Turn Lane Exists)
Crash Type: P & B Crash Type: P & BCrash Type: All
45% 25%35%
HighLow
20 20 10
Medium
Installing/upgrading pedestrian
crossings at uncontrolled locations
with enhanced safety features, such
as flashing beacons, curb extensions,
advanced “stop” or “yield” markings,
and other safety features, at locations
where pedestrians are known to
cross intersections with significant
vehicular traffic, particularly at school
crossings and intersections with turn
pockets, improves pedestrian safety by
providing designated crossing areas
and enhancing driver awareness.

Installing traffic signals at unsignalized
intersections or locations with
high traffic volumes and complex
movements can improve traffic flow,
reduce congestion, and enhance
safety for all road users.

Install traffic circles at intersections
to reduce vehicle speeds and conflict
points. This treatment improves safety
by lowering the likelihood and severity
of angle and speed-related collisions
while maintaining continuous traffic
flow.

Install/Upgrade Pedestrian
Crossing at Uncontrolled
Locations (with Enhanced
Safety Features)
Install Traffic Signals Install Traffic Circles
Crash Type: P & B Crash Type: All Crash Type: All
10 20 20
60% 30%
Very High Very High
Low

CRFCRF CRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Varies

Page 76 of 363 ends

Concord Comprehensive Safety Action Plan

Page 65 ends

Areas experiencing head-on collisions
that may be affected by both the
number of vehicles that cross the
centerline and by the speed of
oncoming vehicles. Installing a raised
median is a more restrictive approach
in that it represents a more rigid barrier
between opposing traffic.

Install Raised Median Install Median (Flush)
Crash Type: All Crash Type: All
25% 15%
20 20
MediumMedium
On‐street parking stalls are painted
diagonally to the street roadway in
order to reduce the width of the road.

Diagonal Parking
Crash Type: All
Adding segment lighting along
roadways improves visibility for all road
users, especially during nighttime and
low-visibility conditions, enhancing
safety and reducing the risk of
collisions.

Installing chicanes, which introduce
alternating horizontal deflection in
the roadway through curb extensions,
islands, or other physical features, helps
reduce vehicle speeds and improve
driver attentiveness. This treatment
is particularly effective on local and
collector streets with speeding
concerns or cut-through traffic. By
requiring drivers to navigate a slight
side-to-side alignment, chicanes
discourage high-speed travel, enhance
neighborhood livability, and reduce
the likelihood and severity of speed-
related collisions.

Add Segment Lighting Install Chicanes
Crash Type: Night Crash Type: All
20 10
35% 35%
High

CRF CRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
60%
15 Areas experiencing head-on collisions
that may be affected by both the
number of vehicles that cross the
centerline and by the speed of
oncoming vehicles. Roadways with
oversized lanes offer an opportunity
to restripe the roadway to reduce the
lanes to standard widths and use the
extra width for the median.

ROADWAY SEGMENT COUNTERMEASURES
Medium Medium
This is an easy to maintain, cost effective
measure, created with paint, epoxy,
thermoplastic, or colored asphalt used
to designate bike lanes, bike boxes,
bike conflict zones or intersection
crossings.

Green Pavement for Bicycle
Facilities
Crash Type: Bicycle
40%
10 High
CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

Page 77 of 363 ends

Concord Comprehensive Safety Action Plan

Page 66 ends

Installing pedestrian crossings
at uncontrolled locations where
pedestrians are known to cross
intersections involving significant
vehicular traffic, particularly at school
crossings and intersections with right
and/or left-turn pockets, improves
pedestrian safety by providing
designated crossing areas and
enhancing driver awareness.

Center Line rumble strips/stripes
can be used on virtually any roadway
especially those with a history of head-
on collisions.

Install Pedestrian Crossing at
Uncontrolled Locations
Install centerline rumble
strips/stripes
Crash Type: P & BCrash Type: All
25%
High
10 10
Traffic signs are installed to prevent
undesired turning movements.

Faded/old traffic signs are replaced. A speed feedback trailer is temporarily placed along a street segment to
remind drivers to watch their speed.

Turn movement Restrictions Refresh of Current Signage Portable Speed Feedback Trailer
Crash Type: All Crash Type: All Crash Type: All
10 10 10
20% 20%
High High High High

CRFCRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Install Rectangular Rapid
Flashing Beacon (RRFB)
Crash Type: P & B
Rectangular Rapid Flashing Beacon
(RRFB) includes pedestrian-activated
flashing lights and additional signage
that enhance the visibility of marked
crosswalks and alert motorists to
pedestrian crossings. RRFB uses an
irregular flash pattern that is similar
to emergency flashers on police
vehicles. RRFBs can be installed at
unsignalized intersections and mid-
block pedestrian crossings.
20 35%
Medium
CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY
Varies Varies

Page 78 of 363 ends

Concord Comprehensive Safety Action Plan

Page 67 ends

Areas proven to have collisions that are
the result of drivers not being able to turn
onto a high speed roadway to accelerate
until the desired roadway speed is
reached and areas that do not provide
the opportunity to safety decelerate to
negotiate a turning movement.

Install Acceleration/
Deceleration Lanes
Crash Type: All
25%
Low
Roadways having a high frequency
of drivers being rear-ended while
attempting to make a left turn across
oncoming traffic. Also can be effective
for drivers crossing the centerline
of an undivided multilane roadway
inadvertently.

Add Two-Way Left-Turn Lane
Crash Type: All
30%
20 Medium
20 Roadways with horizontal curves that
have experienced lane departure
collisions as a result of a roadway
segment having compound curves or
a severe radius. This strategy should
generally be considered only when
less expensive strategies involving
clearing of specific sight obstructions
or modifying traffic control devices
have been tried and have failed to
ameliorate the crash patterns.

Improve Horizontal Alignment
(Flatten Curves)
Crash Type: All
20 20
50%
Low
Removing or relocating fixed objects
outside of the Clear Recovery Zone, such
as utility poles, drainage structures,
trees, and other fixed objects, from
locations or roadway segments prone
to collisions, including the outside of
curves, end of lane drops, and within
traffic islands, can significantly reduce
the severity of run-off-road collisions.

Where public right-of-way is limited,
steps should be taken to request
assistance from property owners, as
appropriate.

Remove Or Relocate Fixed
Objects Outside of Clear
Recovery Zone
Crash Type: All
35%
High
20 When drivers approach and traverse
through complex intersections, drivers
may be required to perform unusual
or unexpected maneuvers, so adding
raised pavement markings and
striping can guide motorists through
complex intersections safely.

Install Raised Pavement
Markers & Striping
Crash Type: All
10%
Very High
10 CRFCRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Intersections noted as having a history
of pedestrian vs. vehicle collisions and
in areas where the likelihood of the
pedestrian presence is high. Corridors
should also be assessed to determine if
there are adequate safe opportunities
for non-motorists to cross and if a
pedestrian signal, or a Pedestrian
Hybrid Beacon (PHB) (also called High-
Intensity Activated crossWalK beacon
(HAWK)) are needed to provide an
active warning to motorists when a
pedestrian is in the crosswalk.

Install Pedestrian Signal
(including Pedestrian Hybrid
Beacon (HAWK))
Crash Type: P & B
Low
20 55%CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

Page 79 of 363 ends

Concord Comprehensive Safety Action Plan

Page 68 ends

Additional or new signage with
fluorescent sheeting can address
collisions caused by lack of driver
awareness or compliance of roadway
signing, especially at night.

Installing chevron signs on roadways
with an unacceptable level of collisions
on relatively sharp curves during
periods of light and darkness can
improve driver awareness of upcoming
curves and help prevent run-off-road
collisions.

Install/Upgrade Signs with
New Fluorescent Sheeting
(Regulatory or Warning)
Install Chevron Signs on
Horizontal Curves
Crash Type: All Crash Type: All
15% 40%
10 10
Very High Very High
Installing curve advance warning signs
with flashing beacons on roadways
with an unacceptable level of collisions
on relatively sharp curves can improve
driver awareness and reduce the risk
of run-off-road collisions. However,
the use of flashing beacons should be
limited to curves with a severe crash
history to maintain their effectiveness.

Install Curve Advance
Warning Signs (Flashing
Beacon)
Crash Type: All
30%
High
10 Installing curve advance warning signs,
which may also include horizontal
alignment and/or advisory speed
warning signs, can improve driver
awareness of upcoming curves and
help prevent run-off-road collisions.

Install Curve Advance
Warning Signs
Crash Type: All
10 25%
Very High
Improving pavement friction with
High Friction Surface Treatments can
enhance skid resistance at locations
with high frequencies of wet road
collisions, potentially addressing
collisions caused by a failure to stop.

Improve Pavement Friction
(High Friction Surface
Treatments)
Crash Type: All
Medium
55%
10 Medium

CRFCRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
Traffic control signage, such as truck
restriction signs, is installed along a
street segment.

New/Enhanced Traffic Control
Signage
Crash Type: All
CRF

EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY
10 High
Varies

Page 80 of 363 ends

Concord Comprehensive Safety Action Plan

Page 69 ends

Installation of delineators, reflectors
and/or object markers are intended to
warn drivers of an approaching curve
or fixed object that cannot easily be
removed.

Any road with a history of run-
off-road right, head-on, opposite-
direction-sideswipe, or run-off-road-
left collisions is a candidate for edge
line or centerlines should be installed
where the existing lane delineation is
not sufficient to assist the motorist in
understanding the existing limits of
the roadway. Depending on the width
of the roadway, various combinations
of edge line and/or center line
pavement markings may be the most
appropriate.

With the goal of improving drivers
speed compliance while making
streets safe, vehicle speed feedback
signs use radar to ascertain the speed
of the vehicle and provide information
through LED signs.

Install Delineators, Reflectors
& Object Markers
Install Edge Lines &
CenterlinesVehicle Speed Feedback Sign
Crash Type: All Crash Type: AllCrash Type: All
15% 25%30%
10 10
Very HighHigh Very High
10 Shoulder and edge line milled rumble
strips/stripes should be used on roads
with a history of roadway departure
collisions.

Install Edge Line Rumble
Strips / Stripes
Crash Type: All
15%
High
10 Speed tables are extended and wide
speed humps with a flat top that may
include a pedestrian crossing. Speed
cushions are traffic calming devices
that reduce vehicle speeds, and can
be speed humps or speed tables with
wheel cutouts for large vehicles. They
are often used on emergency response
routes.

Speed Cushions, Speed
Humps and Speed Tables
Crash Type: All
30%
High
10 Reduction in speed limits in school
zones brings significant safety benefits
by reducing vehicular speeds and fatal
and injury collisions.

Reduced Speed School Zone
Crash Type: All
10 CRFCRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY
30%
Medium

CRF CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

Page 81 of 363 ends

Concord Comprehensive Safety Action Plan

Page 70 ends

Separated bike lanes are most
appropriate on streets with high
volumes of bike traffic and/or high bike-
vehicle collisions, typically in an urban
or suburban area. Separation types
range from simple, painted buffers and
flexible delineators, to more substantial
separation measures including raised
curbs, grade separation, bollards,
planters, and parking lanes.

Installing bike lanes on roadway
segments noted as having collisions
between bicycles and vehicles, or
collisions that may be preventable with
a buffer/shoulder, can significantly
improve bicycle safety and reduce the
risk of these types of collisions.

Install Separated Bike LanesInstall Bike Lanes
Crash Type: P & BCrash Type: P & B
45%35%
20 HighHigh
20 Install Sidewalk / Pathway
(to Avoid Walking along
Roadway)
Crash Type: P & B
Installing raised pedestrian crossings
on lower-speed roadways where
pedestrians are known to be crossing
roadways involving significant
vehicular traffic can improve
pedestrian visibility, slow traffic, and
reduce the risk of pedestrian-vehicle
collisions.

When incorporated with a pedestrian
refuge island and appropriate signage
and advance warning, mid-block
crossings may increase safety by
decreasing random and unexpected
pedestrian crossings while allowing
drivers to predict and expect
pedestrian traffic.

Areas noted as not having adequate
or no sidewalks and a history of
walking along roadway pedestrian
collisions. In rural areas asphalt curbs
and/or separated walkways may be
appropriate.

Mid-Block Crosswalks Install Raised Pedestrian
Crossing
Crash Type: P & B Crash Type: P & B
35%
High
10 2020
80% 25%
Medium Medium
CRFCRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

CRF CRF CRF

EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS) EXPECTED LIFE (YEARS)

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

SYSTEMIC APPROACH

OPPORTUNITY

ADDITIONAL

COUNTERMEASURES
Implement additional Safe Routes
educational programming to include
Safe Routes to Parks, Safe Routes for
Seniors and Safe Routes for People
with Disabilities to prioritize vulnerable
population.

Safe Routes Programs
Crash Type: All
Partner with School District to distribute
targeted Vision Zero messaging for
students and employees.

Community Partnership
Crash Type: All

Page 82 of 363 ends

Concord Comprehensive Safety Action Plan

Page 71 ends

Access management refers to the
design, application, and control of
entry and exit points along a roadway.

This includes intersections with
other roads and driveways that serve
adjacent properties.

Police traffic officer patrols a location
to monitor for speeding/unsafe driving.

Corridor Access ManagementTargeted Enforcement
Crash Type: AllCrash Type: All
Direct traffic enforcement efforts
to prioritize the most critical high-
injury corridors identified in the City’s
Vision Zero Action Plan. Concentrate
enforcement activities in areas of City
where engineering and educational
initiatives have already been
implemented.

High Visibility Enforcement
Crash Type: All
Develop a Vision Zero Training Manual
and integrate Vision Zero traffic safety
awareness and education into training
employees who drive City vehicles
on a daily basis or drive while on City
business.

Vision Zero Training Manual
Crash Type: All
Long-term, tailored, and specialized
treatment programs can serve as an
opportunity to assess drinking habits
and refer them for brief interventions
or specialized treatment.

Create a Share the Road Awareness
Program for motorists, bicyclists and
pedestrians that is easily accessible.

Alcohol Use Disorder (AUD)
Assessment & Treatment
Programs
Share the Road Awareness
Program
Crash Type: AllCrash Type: All
There is broad consensus among
global roadway safety experts that
speed control is one of the most
important methods for reducing
fatalities and serious injuries. Speed
is an especially important factor on
non-limited access roadways where
vehicles and vulnerable road users mix.

Appropriate Speed Limits for
All Road Users
Crash Type: All
Expand the Safe Routes to School
Program to include Vision Zero
Training material for students, parents
and teachers.

Create a Rapid Response Safety
Communication Protocol for Vision
Zero. Implement a communication
plan that addresses recent severe and
fatal collisions, with a specific focus on
promoting traffic safety and health-
conscious behaviors to the community.

Create and actively implement a
branding, promotional, and educational
campaign for Vision Zero to enhance
knowledge and understanding of
its principles. Work together with
community organizations to distribute
materials, spread messages, and
organize public events that promote
active transportation and transit as
responsible choices.

Safe Routes to School
Program
Rapid Response Safety
Communication ProtocolEducational Campaign
Crash Type: All Crash Type: AllCrash Type: All
Prioritize educational initiatives
while issuing citations during traffic
enforcement by actively seeking
opportunities to provide educational
resources. This counter measurement’s
expected lifespan is 20 years.

Educational Initiatives over
Citations
Crash Type: All
Design a traffic safety diversion
program specifically for bicycle and
pedestrian traffic violations, with the
primary goal of facilitating access to
safety courses and programs centered
on biking and walking.

Traffic Safety Diversion
Program
Crash Type: All

Page 83 of 363 ends

Safety Projects

CHAPTER SIX
CSAP

Page 84 of 363 ends

Concord Comprehensive Safety Action Plan

Page 73 ends

Systemic projects consist of citywide initiatives designed to address recurring collision risk factors through consistent improvements across the transportation network. Rather than focusing on individual locations, these projects target common deficiencies that contribute to collisions throughout the city, such as pedestrian safety at signalized intersections and gaps in sidewalk infrastructure.

In Concord, systemic projects were identified based on recurring collision patterns observed in the five- year collision analysis. Community input reinforced these findings, with residents highlighting concerns related to pedestrian safety at signalized intersections and the need for improved and continuous sidewalks.

The systemic projects recommended in this CSAP include:

While systemic projects address network-wide risks, design projects focus on specific corridors and intersections where collision concentrations and operational challenges are more pronounced. These targeted improvements respond to unique roadway conditions, traffic patterns, surrounding land uses, and multimodal travel demands.

Design projects were identified through a detailed evaluation of collision history, roadway characteristics, and community-identified safety concerns. High-injury corridors and areas near schools were prioritized due to their disproportionate share of severe collisions and their critical role within the City’s transportation network.

The design projects recommended in this CSAP include:

This chapter outlines a comprehensive, data-driven strategy to reduce traffic collisions, including fatalities and serious injuries within the City of Concord. Guided by the principles of the Safe System approach and informed by detailed collision analysis covering the period from January 2021 through December 2025, the recommended projects translate identified safety challenges into targeted, implementable improvements.

The proposed location-specific countermeasures respond directly to documented collision trends, including a high incidence of broadside and rear-end collisions, unsafe speed-related violations, vehicle–pedestrian conflicts, nighttime visibility concerns, and traffic signal and/or sign violations at both signalized and unsignalized intersections. These recommendations also reflect priorities identified through stakeholder engagement and community feedback.

To effectively address these safety challenges, the CSAP organizes recommended improvements into two categories:

Together, these approaches provide a balanced framework that addresses both widespread risk factors across the transportation network and location-specific collision patterns along high-injury corridors and intersections. This strategy enables the City to strengthen overall network safety while prioritizing investments in areas where they will have the greatest impact.

The Concord Comprehensive Safety Action Plan (CSAP) identifies 16 proposed projects organized into four categories: High Injury Network (HIN) Corridor Improvements, Complete Streets and Active Transportation, Citywide Safety Programs, and Planning and Policy Initiatives. These projects are designed to address collision patterns observed citywide during the study period, with a focus on corridors and locations where injury data indicates elevated risk for all roadway users.

All projects are conceptual and will require further feasibility analysis, preliminary engineering, and environmental review to define final scope, design, and cost. Implementation is contingent upon securing funding for both design and construction phases, and project prioritization may evolve based on additional technical analysis, community input, and emerging funding opportunities.

SYSTEMIC PROJECTS

DESIGN PROJECTS
Systemic Projects Design Projects
Citywide Pedestrian Sidewalk Improvements
High Injury Corridor Improvements
Citywide Pedestrian Signal Improvements
Complete Streets Construction
11 1
12 2
(Monument Boulevard, Concord Avenue, Galindo Street, Willow Pass Road, Clayton Road) (Cowell Road and Galindo Street)

Page 85 of 363 ends

Concord Comprehensive Safety Action Plan

Page 74 ends

Safe Routes to School Improvements
Willow Pass Road Northern Portion Improvements
Concord Boulevard Safety Improvements
Oak Grove Road Safety Improvements
Bicycle Safety Improvements at High Injury Network Corridors Treat Boulevard Safety Improvements
Port Chicago Highway Safety Improvements
Ygnacio Valley Road and Kirker Pass Road Safety Improvements 3 7
5 9
4 8
6 10
These corridors and locations account for a significant share of injury and KSI (Killed or Seriously Injured) collisions within the City. Corridors identified along the High Injury Network represent a disproportionate share of all KSI collisions citywide, underscoring the need for focused safety investments.

Unlike systemic projects, which address risks across the broader network, design projects deliver targeted solutions at locations where data indicates elevated safety risks. These interventions aim to reduce both the frequency and severity of collisions while improving accessibility, connectivity, and overall user comfort.

Together, systemic and design projects form a comprehensive safety framework for the City of Concord.

Systemic projects address widespread collision risk factors across the transportation network, while design projects focus resources on high-injury corridors and intersections with documented safety concerns.

This integrated strategy ensures that safety investments are both proactive and responsive. Systemic improvements aim to prevent future collisions by addressing common roadway deficiencies, while design projects target locations with a demonstrated history of collisions. By combining detailed data analysis, engineering best practices, and community input, the City establishes a strategic roadmap for reducing fatalities and serious injuries across the transportation network.

INTEGRATED SAFETY STRATEGY

Page 86 of 363 ends

Concord Comprehensive Safety Action Plan

Page 75 ends

Bailey Road
Farm
Bureau
Road
Willow Pass R
oad
Cowell R
oad
Detroit
Avenue
Ygnacio
Val ley Road
Salvi
o Str
eet
Whitman Road
Port Chicago H
ighway
Arnold
Industrial Way
Concord Boulevard
Treat Boulevard
Diamond Bou
levard
Oak
Grove Ro
ad
Bates Avenue
Olivera
Road
Grant
Street
GalindoStreet
Mohr
Lane
Turtle CreekRoad
Lan
dan
a
Drive
Solano
Way
San Mig
uelRoad
Burnett
Avenue
Camino
Estr ad a
Crys
tyl Ranch Drive
Babel Lane
La rwin
Avenue
Myrtle Drive
Ma
rk
et
Street
Minert Road
High School
Aven
ue
Park Highlands
Boulevard
ConcordAvenu e
Willow Pass Road
Clayton Road
Concord Boulevard
Olive Drive
Ayer
sRoad
Kirkwood Drive
West Street
Thorn
woodDrive
Monu
ment Bo
ulevard
Boni
facio
St
reet
Denk
inger
Road
Kirk
er Pass Road
Michigan
Boulevard
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Coventry Road
Walnut Avenue
Pine Hollow Road
Citrus
Avenue
Mt
Diablo Str
eet
SanSimeon Drive
Marsh
Drive
EastStreet
Meadow Lane
Alberta Way
Wash
ington
Boulev
ard
Pache
co
Stree
t
Sixth Street
Lynw
ood Dr
ive
MesaStreet
HillsboroughDr
ive
Clayton
Road
Laguna
Street
Sanford Street
Co
lfaxStr
ee
t
David
Avenue
Galaxy
WayOrionAvenue
Meri
dianPark
Bou
leva
rd
Cha
llenge
Drive
ÄÅ242
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Collisions by severity
Fatal
Severe Injury
Visible Injury
Complaint of pain
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
0 1 Miles
High Injury Corridor Improvements (Monument Boulevard, Concord Avenue, Galindo Street, Willow Pass Road, Clayton Road) 1 Project 1 would deliver targeted safety improvements along five HIN-priority corridors: Clayton Road (SR-242 to Washington Boulevard), Monument Boulevard (Cowell Road to Mohr Lane), Willow Pass Road (I-680 to Avila Road), Concord Avenue (John Glenn Drive to Salvio Street), and Galindo Street (Salvio Street to Cowell Road). Potential improvements identified for further design evaluation include speed feedback signs, enhanced street and intersection lighting, pedestrian passive detection, leading pedestrian intervals (LPI), high-visibility crosswalks, ADA-compliant curb ramps, curb reconfiguration, sidewalk gap closures, access management medians, high-friction surface treatment (HFST), intersection safety analytics, protected intersection design, connected vehicle (C-V2X) technology, and emergency vehicle preemption (EVP GPS) at priority
intersections. Collectively, these five corridors are associated with 687 injury collisions over the study period, including 8 fatalities and 52 severe injuries.
709
INJURY

COLLISIONS
8(1%)
52(7%)
494(70%)
155(22%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 87 of 363 ends

Concord Comprehensive Safety Action Plan

Page 76 ends

Bailey Road
Farm
Bure
au
Road
Concord
Boulevard
WillowPas s Road
Cowell R
oad
Detroit
Avenue
Clayton Road
Ygnacio
Val ley Road
FryWay
Salvi
o Street
Whitman Road
Port Chicago H
ighway
Arnold
Industrial Way
Conco
rd Bou
levard
Treat
Bo
uleva
rd
Diamond Bou
levard
Oak G
rov
eRoad
Bates Avenue
Olivera
Road
Grant
Street
Ga
lindo
Stre
et
Mohr
Lane
Turtle CreekRoad
Lan
dan
a
Drive
Solano
Way
San Mig
uelRoad
Burnett
Avenue
Camino
Estr ad a
Crys
tyl Ranch Drive
Marke
t
St
re
et
Babel Lane
La rwin
Avenue
Myrtle Drive
Minert Road
High School
Aven
ue
Park Highland
s
Bou
levard
Willow Pass Road
Clayton Road
Olive Drive
Ayers Roa
d
Kirkwood Drive
West Street
Thorn
woodDrive
Monument Boulevard
Bonifacio Street
Denk
inger
Road
Kirk
er Pass Road
Michigan
Boulevard
Concord
Avenue
Bailey
Road
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Coventry Road
Walnut Avenue
Pine Hollow Road
Citrus
Avenue
Mt Di
abloStreet
SanSimeon Drive
Marsh
Drive
EastStreet
Meadow Lane
Alberta Way
Wash
ington
Boulevard
Sixth Street
Parkside Drive
Lynw
ood Dr
ive
MesaStreet
HillsboroughDr
ive
Laguna Street
Broadway
Street
ConcordBoulevard
Sanford Street
Co
lfaxStre
et
David
Avenue
Galaxy
WayOrionAvenue
Meri
dianPark
Bou
leva
rd
Cha
lle
nge
Driv
e
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Corridor Improvments
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
0 1 Miles
High Injury Corridor Improvements (Monument Boulevard, Concord Avenue, Galindo Street, Willow Pass Road, Clayton Road)

COLLISION TRENDS
1 Clayton Rd Safety Improvements Clayton Rd: SR-242 to Washington Boulevard $5,497,100 Monument Blvd Safety Improvements Monument Blvd: Cowell Road to Mohr Lane $2,609,700 Willow Pass Rd Safety Improvements Willow Pass Rd: I-680 to Avila Road $2,003,000 Concord Ave Safety Improvements Concord Ave: John Glenn Drive to Salvio Street $1,146,400 Galindo St Safety Improvements Galindo St: Salvio St to Cowell Rd $3,234,500

LOCATIONS ESTMATED COST
Contingency Cost $2,898,000
Engineering Cost $5,216,000
Total Cost $22,605,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Rear End
Traffic Signals & Signs
608 Collisions
317 Collisions
210 Collisions
168 Collisions
155 Collisions
86%
45%
30%
24%
22%
1 2
4 3
5 62
5 500
5 46
80 11
MODE

Page 88 of 363 ends

Concord Comprehensive Safety Action Plan

Page 77 ends

Complete Streets Construction
(Cowell Road and Galindo Street) 2
Project 2 would advance the design and potential construction of complete street improvements on three corridors: Monument Boulevard (Iron Horse Trail to Walters Way), Cowell Road (Monument Boulevard to Ygnacio Valley Road), and Galindo Street (Concord Boulevard to Cowell Road), building on an existing feasibility study. Potential improvements include bicycle and pedestrian safety enhancements and transit connection and circulation improvements, with prioritization informed by proximity to schools and parks.

Bailey Road
Farm
Bure
au
Road
Concord
Boulevard
WillowPas s Road
Cowell Road
Detroit
Avenue
Ygnacio
Valley Road
FryWay
SalvioStreet
Whitman Road
Port Chicago H
ighway
Arnold
Industrial Way
Conco
rd Bou
levard
Treat
Bo
uleva
rd
Diamond Bou
levard
Oak
Grove Ro
ad
Bates Avenue
Olivera
Road
Grant
Street
Galin
do Stre
et
Mohr
Lane
Turtle CreekRoad
Lan
dan
a
Drive
Solano
Way
San Mig
uelRoad
Burnett
Avenue
Camino
Estr ad a
Crys
tyl Ranch Drive
Marke
t
St
re
et
Babel Lane
La rwin
Avenue
Myrtle Drive
Minert Road
High School
Aven
ue
Park Highland
s
Bou
levard
Willow Pass Road
Clayton Road
Olive Drive
Ayers Roa
d
Kirkwood Drive
West Street
Thorn
woodDrive
Monu
ment Bo
ulevard
BonifacioStre
et
Denk
inger
Road
Kirk
er Pass Road
Michigan
Boulevard
Concord Avenue
Bailey
Road
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Coventry Road
Walnut Avenue
Pine Hollow Road
Citrus
Avenue
Mt
DiabloStreet
SanSimeon Drive
Marsh
Drive
EastStreet
Meadow Lane
Alberta Way
Wash
ington
Boulev
ard
Pacheco
Street
Sixth Street
ParksideDrive
Lynw
ood Dr
ive
HillsboroughDr
ive
Clayton
Road
Laguna Street
Broadway
Street
ConcordBoulevard
Sanford Street
Colfax
Street
David
Avenue
Galaxy
WayOrionAvenue
Meri
dianPark
Bou
leva
rd
Cha
lle
nge
Driv
e
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Collisions by severity
Fatal
Severe Injury
Visible Injury
Complaint of pain
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
0 1 Miles
Fatal
Severe Injury
Visible Injury
Complaint of Pain
268
INJURY

COLLISIONS
3(1%)
17(6%)
188(70%)
60(23%)

Page 89 of 363 ends

Concord Comprehensive Safety Action Plan

Page 78 ends

Bailey Road
Farm
Bure
au
Road
Concord
Boulevard
WillowPas s Road
Cowell R
oad
Detroit
Avenue
Clayton Road
Ygnacio
Val ley Road
FryWay
Salvi
o Street
Whitman Road
Port Chicago H
ighway
Arnold
Industrial Way
Conco
rd Bou
levard
Treat
Bo
uleva
rd
Diamond Bou
levard
Oak G
rov
eRoad
Bates Avenue
Olivera
Road
Grant
Street
Ga
lindo
Stre
et
Mohr
Lane
Turtle CreekRoad
Lan
dan
a
Drive
Solano
Way
San Mig
uelRoad
Burnett
Avenue
Camino
Estr ad a
Crys
tyl Ranch Drive
Marke
t
St
re
et
Babel Lane
La rwin
Avenue
Myrtle Drive
Minert Road
High School
Aven
ue
Park Highland
s
Bou
levard
Willow Pass Road
Clayton Road
Olive Drive
Ayers Roa
d
Kirkwood Drive
West Street
Thorn
woodDrive
Monument Boulevard
Bonifacio Street
Denk
inger
Road
Kirk
er Pass Road
Michigan
Boulevard
Concord
Avenue
Bailey
Road
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Coventry Road
Walnut Avenue
Pine Hollow Road
Citrus
Avenue
Mt Di
abloStreet
SanSimeon Drive
Marsh
Drive
EastStreet
Meadow Lane
Alberta Way
Wash
ington
Boulevard
Sixth Street
Parkside Drive
Lynw
ood Dr
ive
MesaStreet
HillsboroughDr
ive
Laguna Street
Broadway
Street
ConcordBoulevard
Sanford Street
Co
lfaxStre
et
David
Avenue
Galaxy
WayOrionAvenue
Meri
dianPark
Bou
leva
rd
Cha
lle
nge
Driv
e
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Corridor Improvment
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
Complete Streets Construction
(Cowell Road and Galindo Street) 2
0 1 Miles
Cowell Rd Complete Streets Improvements Cowell Rd: Monument Boulevard to Ygnacio Valley Road $10,000,000 Monument Blvd Complete Streets Improvements Monument Boulevard: Cowell Road to Mohr Lane $30,000,000 Galindo St Complete Streets Improvements Galindo Street: Concord Blvd to Cowell Road $5,000,000

LOCATIONS ESTMATED COST
Contingency Cost $9,000,000
Engineering Cost $18,900,000
Total Cost $72,900,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Rear End
Traffic Signals & Signs
234 Collisions
125 Collisions
68 Collisions
82 Collisions
59 Collisions
87%
47%
25%
31%
22%
1 2
4 3
5 COLLISION TRENDS
22 2
189
4 15
31 5
MODE

Page 90 of 363 ends

Concord Comprehensive Safety Action Plan

Page 79 ends

Safe Routes to School
Improvements 3
Project 3 would implement a Safe Routes to School program in school proximity areas citywide, informed by the City’s 2024 SS4A grant proposal. Potential improvements identified for further evaluation include curb reconfiguration, high-visibility crosswalks with advance stop bars, raised crosswalks, dynamic warning signage, bike lanes, and enhanced school zone circulation improvements. Collision data indicates 131 pedestrian and bicycle collisions in school proximity areas over the study period, including 4 fatalities and 21 severe injuries.

Bailey Road
Farm
Bureau
RoadWillow
Pass
Roa d
Cowell R
oad
Det
roit A
ve
nue
Ygnacio
Val ley Road
Fry Way
Salv
io
Street
Whitman
Road
Port
Chicag
oHighway
Arnold
Industrial Way
Concord Boulevard
Treat B oulevard
Diamond Bou
levard
Oak Gr
ove Ro
ad
O livera
Road
Bates Avenue
Ol
ivera
Road
Gr
ant Stre
et
Ga
lindo
Str
ee
t
Mohr
Lane
Turtle CreekRoad
Lan
dana
Drive
Solano
Way
San Mig
uelRoad
Burnett
Avenue
Camino
Estr ad a
Crys
tyl Ranch Drive
Marke
t
St
re
et
Babel Lane
La rwin
Avenue
Myrtle Drive
Minert
Road
Concord Av
enue
Willow Pass Road
Clayton Road
Concord Boulevard
Olive Drive
Ayers Roa
d
Kirkwood Drive
West Street
Thorn
woodDrive
Monument
Boulevard
Bon
ifacio St
reet
Denk
inger
Road
Kirk
er Pass Road
Michig
anBoulevard
Bailey
Road
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Cov
entry
Road
Walnut Avenue
Pine Hollow RoadCitrus
Avenue
MtDiablo St
reet
San Simeon
Drive
Marsh
Drive
Meadow Lane
Alberta Way
Washington
Boulevard
Six th
Street
Lynw
ood Dr
ive
Hillsboro
ugh
Dr
ive
Clayton
Road
Laguna
Street
Broadway
Street
Sanford Street
David Avenue
Galaxy
WayOrionAvenue
Meri
dianPark
Bou
leva
rd
Cha
lle
nge
Driv
e
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Collisions by severity
Fatal
Severe Injury
Visible Injury
Complaint of pain
Schools
Schools quarter miles
buffer
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
High Visibility Crosswalks
Advanced Stop Bars
Raised Crosswalks
Dynamic Warning Signs
Bike Lanes
Enhanced School Zone Circulation

IMPROVEMENTS
Intersection
Broadside
Rear End
Nighttime
Unsafe Speed Violations
85 Collisions
246 Collisions
169 Collisions
207 Collisions
155 Collisions
12%
36%
25%
30%
23%
5 1
3 2
4 COLLISION TRENDS
687
INJURY

COLLISIONS
7(1%)
53(8%)
463(67%)
164(24%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain
53 3
488
4 44
77 18
MODE

Page 91 of 363 ends

Concord Comprehensive Safety Action Plan

Page 80 ends

Bicycle Safety Improvements at
High Injury Network Corridors 4
Project 4 would deliver bicycle safety improvements across multiple HIN corridors and citywide locations, potentially including Class I shared-use path enhancements, protected bike lane intersection treatments, bike lane gap closures, and crossing improvements at major intersections. Corridors and locations identified for further evaluation include Monument Boulevard (Systron Drive to Mohr Lane), Concord Boulevard (Grant Street to Port Chicago Highway), Cowell Road, Galindo Street, Diamond Boulevard, Market Street, and Clayton Road. Over the study period, 149 bicycle collisions were recorded citywide, with multiple severe injuries at locations identified as candidates for gap improvements.

Bailey Road
Farm Bur
eau
Road
CowellRoad
Willow
Pass R o ad
Detro
it A
ven
ue
Clayton Road
Ygnacio
Val ley Road
FryW
ay
Salvi
o Str
eet
Whitman Road
Port Chi
cago
High
w
ayArnold
Industrial Way
Concord Boulevard
Treat
Boulevard
DiamondBoulevard
Oak
GroveRoad
Bates Avenue
Olivera
Road
GrantStree
t
Mohr
Lane
Turtle CreekRoad
Lan
dan
a
Drive
Solano
Way
San Miguel
Road
Camino
Estr ad a
Cry
styl
Ra
nch
Drive
MarketStreet
Babel Lane
La rwin
Avenue
Myrtle Drive
Minert Road
High School
Aven
ue
Will
ow
Way
Par
k Highlands
Boul evard
Con cord Avenue
Willow Pass Ro
ad
Clayton Road
Olive Drive
Ayers Roa
d
Kirkwood Drive
West Street
Thorn
woodDrive
M
onu
ment
Boulevard
Boni
facio
St
reet
Denk
inger
Road
Kirk
er Pass Road
Mich
igan
Boulevard
Clayton Way
Chestnut
Avenue
Sunvalley
Boulevard
Coventry Road
Walnut Avenue
Pine Hollow Road
Citrus
Avenue
Mt
Diablo Str
eet
SanSimeon Drive
Marsh
Drive
EastStreet
Meadow Lane
Alberta Way
Wash
ington
Boulev
ard
Pache
co
Stree
t
Sixth Street
ParksideDrive
Lynw
ood Dr
ive
MesaStreet
HillsboroughDr
ive
Laguna
Street
ConcordBoulevard
Sanford Street
Colfax
Street
David
Avenue
Galaxy
Way
OrionAvenue
Merid
ianPark
Bouleva
rd
Cha
lle
nge
Driv
e
ÄÅ242
ÄÅ4
ÄÅ4
ÄÅ4
680
680
Collisions by severity
Fatal
Severe Injury
Visible Injury
Complaint of pain
Primary Highways
Major Roadways
Other Roadways
Water
Parks
Concord Citylimit
0 1 20.5
Miles
0 1 Miles

LOCATIONS ESTMATED COST
Contingency Cost
Engineering Cost
Total Cost

IMPROVEMENTS
Intersection
Broadside
Improper Turning
Nighttime
Automobile Right of Way
85 Collisions
60 Collisions
15 Collisions
22 Collisions
13 Collisions
91%
65%
16%
24%
14%
1 2
4 3
5 COLLISION TRENDS
93 INJURY

COLLISIONS
2(2%)
12(13%)
40(43%)
39(42%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain
Protected Bike Lane Intersections Various Signalized Intersections along Concord Blvd $1,660,000 Bike Lane Improvements High Injury Network Corridors with Bicycle Collisions $52,727,830 $18,877,600
$22,842,900
$88,108,400

Page 92 of 363 ends

Concord Comprehensive Safety Action Plan

Page 81 ends

Concord Boulevard Safety
Improvements 5
Project 5 would address safety and active transportation connectivity considerations along Concord Boulevard (SR-242 to Kirker Pass Road). Improvements identified for design consideration include sidewalk gap closures, crosswalk enhancements — including potential HAWK signal conversions and LED beacon installations — sight triangle clearance, raised or separated path improvements near schools, and speed feedback signs. This corridor is associated with 35 collisions where unsafe speed was identified as a contributing factor and 29 rear-end collisions, with noted pedestrian activity in proximity to two schools.

TheAlameda
CaminoEstrada
Myrtle Drive
Kent Way
FarmBureauRoad
West Street
Allegro AvenuePark Street
Baio Lane
East Street
Walnut Avenue Laurel Drive
BeachStreet
Silverleaf Lane
Ramp
La Calle
Tobi Drive
Clark Lane
Clayton Road
BishopDrive
Dover Way
Dianda Drive
ParkingLot
Calaveras Drive
Kimball Way
Fabian Way Wolf Way AyersRoad
Altura Drive
Jerilynn Drive
W
estwoodDrive
Adams Drive
Esperanza Drive
ElmhurstLane
Olive Drive
Salem Street
Wren Avenue
Granada Drive
ThornwoodDriveClayton Way
Concord Boulevard
Grant Street
Colfax Street
Euclid Avenue
Joelle Drive
Hames Drive
Clay Alley
Kirkwood Drive
Holly Drive
GlazierDrive
Fir Street
FifthStreet
Vern Lane
Enid Drive Lodato CourtMendocino Drive
Melody Drive
Brenda Circle
Denkinger Road
Bacon Street
KirkerPassRoad
Joyce Drive
Elm Road
Scott Road
Garnet Lane
Renee Way
Cherokee Drive
Parkside Circle
Netto Drive
Fill Sidewalk Gaps
West of Alary Dr to Woodside Ct
Sutter St to Galindo St
$442,700
Enhance Pedestrian Crossings
2nd St
Contra costa Trail Crossing
$684,600
Sight Distance Improvements Intersections along Corridor $100,000 Speed Feedback Signs Highway 242 to Kirker Pass Rd $150,000 Intersection
Broadside
Nighttime
Unsafe Speed
Traffic Signals & Signs
146 Collisions
65 Collisions
38 Collisions
39 Collisions
95%
42%
25%
25%
22%
1 2
4 3
5 COLLISION TRENDS

LOCATIONS ESTMATED COST
Contingency Cost $9,000,000
Engineering Cost $18,900,000
Total Cost $72,900,000

IMPROVEMENTS
34 Collisions
153
INJURY

COLLISIONS
1(1%)
8(5%)
103(67%)
41(27%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain
10 1
121
10 8
3 MODE MODE

Page 93 of 363 ends

Concord Comprehensive Safety Action Plan

Page 82 ends

Port Chicago Highway Safety
Improvements 6
Project 6 would evaluate and implement safety improvements along Port Chicago Highway (north of High School Avenue to the City Limits), including at Bonifacio Street, East Olivera Road, and North 6th Street. Potential improvements identified for design consideration include median expansion and curb extensions, speed feedback signs, signal timing modifications, protected left-turn phasing, leading pedestrian intervals, high-visibility crosswalks, and ADA-compliant curb ramps. Collision data indicates a pattern of 13 broadside collisions on this segment, including 4 at the 6th Street intersection and 1 pedestrian severe injury at Bonifacio Street.

Pacheco Street
Concord Boulevard
Panoramic Drive
Clayton Road
Willow Pass Road
FloydLane
Sun View Terrace
Mt Diablo Street
Almond Avenue
4 EsperanzaDrive
East Street
Hillsborough Drive
Justin Way
Beach StreetEsperanzaDrive
Bates Avenue
Sixth Street
ParkStreet
Flamingo Drive
San Michele Drive
Jerilynn Drive
Dormer Avenue
Port Chicago Hwy To Sr 4 W Ramp
Port Chicago Highway
Cardinal Drive
Olivera Road
Bonifacio Street
AtheneDrive
Sprig Court
Ranchford Court
First Street
Riverview
Drive
Bayview
Circle
SalvioStreet
Grant Street
Colfax Street
Claudia Drive
Fir Street
Elm Street
Cedar Street
Park Avenue
Welch Court
Purley Lane
St George Drive
Second StreetRonald Way
Bacon StreetSanford Street
Winthrop Street
Pike Lane
Benton Street Reva DriveHolbrook Drive
Dena Drive
Port Chicago Highway
Baker Drive
Fitzpatrick Drive
Erie Drive
Meadowbrook Drive
Ida Drive
ParksideCircleMontgomery AvenuePrestwickAvenue
Commercial Circle
ÄÅ4
Speed Feedback Signs North of High School Ave $30,000
Sight Distance Improvements North of High School Ave $50,000 Median and Access Management North of High School Ave $200,830 Modify Signal Timing and Hardware Traffic Signals $121,000 Protected Left Turn N 6th St $20,000
Pedestrian Crossing Improvements
Bonifacio St
E Olivera Rd
$48,440

LOCATIONS ESTMATED COST
Contingency Cost $94,000
Engineering Cost $197,000
Total Cost $761,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Traffic Signals & Signs
Unsafe Speed
Automobile ROW Violations
51 Collisions
39 Collisions
21 Collisions
22 Collisions
78%
60%
32%
34%
18%
15%
1 2
4 3
5 6

COLLISION TRENDS COLLISION TRENDS
12 Collisions
10 Collisions
65 INJURY

COLLISIONS
1(1%)
7(11%)
39(60%)
18(28%)Fatal
Severe Injury
Visible Injury
Complaint of Pain
1 1
53 3
4 3

MODE MODE

Page 94 of 363 ends

Concord Comprehensive Safety Action Plan

Page 83 ends

Willow Pass Road Northern Portion
Improvements 7
Project 7 would address delineation and roadway edge treatment considerations along Willow Pass Road from north of Lynwood Drive to the City Limits. Potential improvements identified for further evaluation include median delineators to discourage unsafe passing, enhanced curve delineation, widened edge lines, object markers, rumble strips, and streetlight upgrades.

Galindo Street
Ellis Street
Willow Pass Road
Detroit Avenue
Almond Avenue
Adelaide Street
PineStreet Concord Boulevard
Diam
ond
Boulevard
CarlottaDrive
242 Market Street
680
Park Street
Euclid Avenue
Granada Drive
Grant Street
Oak Street
Lynwood
Drive
Landana Drive
Consuelo Road
Laguna Street
Civic Court
FryW
ay
Natoma DriveAlturaDrive
Bonifacio Street
Clayton Road
Sixth Street
Parkside Drive
M
tDiablo
Street
Rogers Road
Harrison Street
Fremont Street
EastStreet
SanVincente Drive
ColfaxStreet
ThirdStreet
Misty Lane
Clay Alley
Fir Street
Elm StreetDate StreetCedar StreetBeach Street
Bedford Road
Clayton Road
Second Street
Ameno Road
Santa Rita Drive
California Street
RicardoDrive
Challenge Drive
Fifth Street
Elderwood Drive
Olivera Road
Parkside Circle
Bailey Road
ÄÅ242
680
Delineators, Wider Edgeline, and Rumble Strips North of Lynwood to City Limits $197,900 Street Lighting North of Lynwood to City Limits $178,500 Enhance Curve Delineation North of Lynwood to City Limits $34,350 Signs and Object Markers North of Lynwood to City Limits $7,500

LOCATIONS ESTMATED COST
Contingency Cost $83,000
Engineering Cost $175,000
Total Cost $677,000

IMPROVEMENTS
152
INJURY

COLLISIONS
1(1%)
14(9%)
110(72%)
27(18%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain
Intersection
Broadside
Nighttime
Unsafe Speed
Traffic Signals & Signs
138 Collisions
75 Collisions
34 Collisions
49 Collisions
91%
49%
22%
32%
20%
1 2
4 3
5 COLLISION TRENDS
31 Collisions
9 116
11 16
MODE

Page 95 of 363 ends

Concord Comprehensive Safety Action Plan

Page 84 ends

Treat Boulevard Safety
Improvements 8
Project 8 would address the Treat Boulevard corridor (Winton Drive to Clayton Road, approximately

3.1 miles) through a combination of planning and physical improvements. Potential elements identified for design consideration include a complete street feasibility study and preliminary design, mast-arm signal head upgrades, sidewalk improvements and gap closures, HAWK signal installation, leading pedestrian intervals (LPI) corridor-wide, speed feedback signs, and curve safety treatments including high-friction surface treatment (HFST) and warning beacons. Evaluation of a bicycle and pedestrian connection between San Miguel Road and Marietta Circle is also identified for further study. This corridor is associated with 76 total injury collisions over the study period, including 5 pedestrian-involved, 5 bicycle-involved, and 1 bus-involved collision.

Bel Air Drive
San
M
iguelRoad
NavaronneW
ay
Oak Grove Road
Rose
Lane
Alfonso Drive
Ryan Road
PembrokeDrive
Cowell Road
Royal Ann Lane
Santa Paula Drive
St Matthew Place
Graymont Circle
CitrusAvenue
Lev Lane
Torino Way
Sussex WayTilley Circle
Lyon CircleSmith Lane
Canterbury Drive
Sherwood Drive
Gladstone Drive
TullyW
ay
Cheshire Drive
FallbrookRoad
Chelsea Way
Barrymore Drive
W
ilm
oreAvenue
San Gabriel Drive
Sean Place
BirchBarkRoad
Daniel Lane
Blenheim Way
Kaski Lane
Ryan Court
Molad Court
M
adiganAvenue
Rustic Road
Tamori Lane
Brannan Place
Treat Boulevard
SanSimeon
Drive
Tokola Drive
Frayne Lane
TurtleCreek
Road
Parking Lot Lynn
Drive
77 INJURY

COLLISIONS
2(3%)
10(13%)
51(66%)
14(18%)Fatal
Severe Injury
Visible Injury
Complaint of Pain
Upgrading pedestal mounted left turn heads to mast arm mounted Various Signalized Intersections $915,000 Fill Sidewalk Gaps Lancelot Drive to Navaronne Way $2,565,200 Advanced Traffic Signal Beacon Treat Blvd and Navaronne Way $130,000 Leading Pedestrian Interval Various Signalized Intersections $27,000 HAWK Signal Treat Blvd and Blarney Ave $650,000
Speed Feedback Signs Argonne Dr to Clayton Rd $90,000
Enhance Curve Delineation Curve Locations $62,000

LOCATIONS ESTMATED COST
Contingency Cost $887,000
Engineering Cost $1,864,000
Total Cost $7,191,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Unsafe Speed
Traffic Signals & Signs
66 Collisions
30 Collisions
21 Collisions
25 Collisions
86%
39%
27%
32%
18%
1 2
4 3
5 COLLISION TRENDS
14 Collisions
6 1
59 3
5 3

MODE MODE

Page 96 of 363 ends

Concord Comprehensive Safety Action Plan

Page 85 ends

Oak Grove Road Safety
Improvements 9
Project 9 would evaluate safety improvements along Oak Grove Road (City Limits to Monument Boulevard), including raised median installation, speed feedback signs, crosswalk enhancements at various locations — including the Contra Costa Trail crossing — and sight distance improvements. Collision data indicates elevated speed and sight distance considerations along this corridor.

SierraRoad
Apple Drive
Peach Place
Pear Drive
SantaPaulaDrive
Ramp
Markham Street
TreatBoulevardMinert Road
Alla Court
Barrymore Drive
Parrin Court
Fox Way
Gilardy Drive
Belann Court
SantaM
ariaDrive
Junction Drive
Scally Court
Sean Place
Apricot Lane
Lyon Circle
Woodmoor Drive
Chanel Court
W
ard
W
ay
Oak Grove Court
Tokola Drive
Virginia Lane
Willy Way
Santa Maria Court
Notre Dame Avenue
Litwin Drive
Risdon Road
HollisCourt
Gilly Lane
Keswick Lane
M
ango
Road Ryan Road
Fox Meadow Way
Median and Access Management Gilly Ln to City Limits $2,235,440 Speed Feedback Signs City Limit to Monument Blvd $90,000 Sight Distance Improvements City Limit to Monument Blvd $80,000 Pedestrian Crossing Enhancements Various Locations including Contra Costa Trail Crossing $41,000

LOCATIONS ESTMATED COST
Contingency Cost $489,000
Engineering Cost $1,027,000
Total Cost $3,963,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Unsafe Speed
Traffic Signals & Signs
39 Collisions
16 Collisions
14 Collisions
15 Collisions
83%
34%
30%
32%
28%
1 2
4 3
5 COLLISION TRENDS
13 Collisions47
INJURY

COLLISIONS
1(2%)
6(13%)
33(70%)
7(15%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain
6 1
36 1
2 1

MODE MODE

Page 97 of 363 ends

Concord Comprehensive Safety Action Plan

Page 86 ends

Ygnacio Valley Road and Kirker
Pass Road Safety Improvements 10
Project 10 would identify and address geometric, striping, and roadway safety considerations along Ygnacio Valley Road (Alberta Way/Pine Hollow Road to Park Highlands Boulevard) and Kirker Pass Road (Concord Boulevard to the City Limits). Potential improvements identified for design consideration include geometric revisions to curb radii and striping, sidewalk and shared path gap closures, overhead signal warning beacons, high-friction surface treatment (HFST), raised median or barrier installation, median street lighting, full corridor restriping, guardrail, and crash cushions.

Collision data indicates elevated speed and sight distance considerations on these high-speed segments, particularly on downhill curves..

Larwin Avenue
Roundtree Drive
Camino Estrada
CrystylRanchDrive
Las Ram
blas
Campus Drive
Olive Drive
Balhan Drive
Allegro Avenue
Lyric Lane
Clark LaneOak
KnollDrive
Lightwood Drive
Parking Lot
PebbleGlenDrive
Jameson CourtConcord
Boulevard
Alberta Way
Preston Court
Leo LaneAyers Road
Wilke Drive
Center Drive
Brookside Lane
Clayton Road
Black Oak Road
MontecitoDrive
Paul Lane
BoulderCourt
New Hampshire Drive
Fill Sidewalk Gaps Sidewalk Gaps $3,864,100
Traffic Signal Warning Beacons Cowell Rd $85,500
High Friction Surface Treatment Cowell Rd \ Ayers/Alberta \ Myrtle to City Limits $564,400 Raised Median or Barrier City Limits to Michigan Blvd $1,625,000 Street Lighting City Limits to Michigan Blvd $2,504,000 Upgrade Striping Whole Corridor $514,800
Install Guardrail SB on Kirker Pass North of Clearbrook Dr $31,000 Crash Cushion Before median barrier on Kirker pass $197,000

LOCATIONS ESTMATED COST
Contingency Cost $1,877,000
Engineering Cost $3,942,000
Total Cost $15,205,000

IMPROVEMENTS
Intersection
Broadside
Nighttime
Unsafe Speed
Traffic Signals & Signs
64 Collisions
40 Collisions
29 Collisions
37 Collisions
77% 2
48% 1
35% 68
45% 6
19% 6
1 2
4 3
5 COLLISION TRENDS MODE
16 Collisions
83 INJURY

COLLISIONS
3(4%)
7(8%)
55(66%)
18(22%)
Fatal
Severe Injury
Visible Injury
Complaint of Pain

Page 98 of 363 ends