1 COUNCILMEMBERS
Laura M. Nakamura, Mayor
Dominic D. Aliano, Vice Mayor
Pablo Benavente
Laura M. Hoffmeister
Carlyn S. Obringer
Civic Center
1950 Parkside Drive
Concord, CA 94519
www.cityofconcord.org
Regular Meeting of the
Concord City Council
Tuesday
August 11, 2026
6:30 p.m. - Open Session Council Chamber
1950 Parkside Drive
and/or various
telephonic/electronic
locations
*IMPORTANT NOTICE ABOUT PUBLIC COMMENTS AND MEETING PARTICIPATION* Members of the public are invited to attend and participate at: Council Chamber, 1950 Parkside Drive, Concord, CA, various telephonic/electronic locations indicated below.
Please note the following change to the City’s public comment procedures: Public comment may be provided in-person, remotely, or via email, as set forth below.
Members of the public desiring to provide comments as a part of the meeting are encouraged to either submit written comments by 3:00 p.m. prior to the meeting or to attend the meeting in person.
HOW TO PARTICIPATE
The public is invited to participate in the City Council meeting using any of the following methods:
1. IN PERSON:
a. Members of the public can provide in-person comments in the Council Chamber.
Members of the public are encouraged, but not required, to fill out a speaker card. The Council Chamber will have seating available for members of the public to attend in person up to full seating capacity.
2 2. REMOTE: The public may participate and provide public comment remotely as follows:
a. Zoom:
https://cityofconcord.zoom.us/j/83540236865?pwd=bZD4daeX5Y6efiGmnRCMS7QTL1F t0Q.jn-KytmvKySTg5zc or Zoom Webinar ID: 835 4023 6865 and Passcode: 740691 b. Zoom Phone Numbers. Dial Toll Free: (669) 900-6833 or (346) 348-7799 or (253) 215- 8782.
c. During the meeting, each period for public comment will be announced, and participants may use the “Raise Hand” feature on Zoom to request to speak. If calling in via Zoom use *9 to raise and lower your hand. The meeting host will call on you, by name, and promote you to panelist in the webinar so you can be seen via your camera. Please enable your microphone when it is your turn to speak. In order to ensure the orderly administration of the meeting using this method, providing your name so that we can efficiently call on you when its your turn to speak is encouraged, but is not required. (If you need instructions on how to use this feature, please contact the City Clerk by 3:00 p.m. of the meeting date at [email protected]).
3. EMAIL:
a. Public comments can also be submitted via email to [email protected]. Please note that emailed comments will not be read aloud by staff. Any public comments received up until 3:00 p.m. of the meeting date will be:
1. distributed to the Council before the meeting,
2. posted online for public inspection at
https://stream.ci.concord.ca.us/OnBaseAgendaOnline/Meetings/Search, and
3. inserted into the meeting record.
b. As emails containing public meeting comments are part of the official record, note that personal contact information may be published if it is included with your email.
4. TO WATCH OR LISTEN ONLY:
a. Watch on TV on Comcast Channel 28, Astound/Wave Channels 29, and AT&T U-verse Channel 99
b. Watch the TV broadcast through the City’s website by following THIS LINK c. Watch Live Streaming of the meeting by following THIS LINK d. Join the Zoom webinar by following THIS LINK
3 5. INTERPRETATION OR WRITTEN TRANSLATION:
OPEN SESSION
1. OPENING
Roll Call - Councilmember Announcements of "Just Cause" Remote Participation
Pledge of Allegiance - Councilmember Obringer
2. PUBLIC COMMENT PERIOD
This is a 15-minute Public Comment Period for items within the City Council’s subject matter jurisdiction that are not on this agenda. Each speaker will be limited to approximately three minutes.
State law prohibits the City Council from acting at this meeting on any matter raised during the Public Comment Period. Please see “How to Submit Public Comments” above
3. PRESENTATIONS
a. Presentation – an update on the Contra Costa Water District by Contra Costa Water District Board President Ernesto A. Avila, P.E. Introduction by Mayor Nakamura.
1. To access interpretation or written translation during the meeting, please scan the QR Code or click this link:
Para accesar a la traducción durante la reunion, por favor escanee el Código QR o haga clic en el enlace:
https://attend.wordly.ai/join/SYMQ-8840
2. Choose Language and Click Attend
Seleccione su lenguaje y haga clic en asistir
3. Use a headset on your phone for audio or read the transcript on your device.
Use sus auriculares para escuchar el audio o leer la transcipción en el dispositivo.
4 4. CITY COUNCIL CONSENT CALENDAR
The public is entitled to address the City Council on items appearing on the Consent Calendar before or during the City Council’s consideration of the Consent Calendar. Adoption of the Consent Calendar may be made by one motion of the City Council, provided that any Councilmember, individual or organization may request removal of an item from the Consent Calendar for separate consideration.
If a request for removal of an item from the Consent Calendar has been received, the Mayor may defer action on the particular item and place the same on the regular agenda for consideration in any order s/he deems appropriate. Please see “How to Submit Public Comments” above. a. Considering – approval of minutes from the June 23, and July 28, 2026, Regular Meetings and July 28, 2026, Special Meeting. Recommended by the City Clerk.
b. Considering – the appointment of Brian Capurro to the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029, as recommended by the Council Committee on Youth and Education (Hoffmeister/Obringer). Recommended by the City Clerk. c. Considering – adoption of a Resolution amending Resolution No. 25-47 by deleting a Regular Council Meeting on December 8, 2026, from, and adding a Regular Council Meeting on December 15, 2026, to the 2026 City Council Meeting Calendar. Recommended by the City Clerk.
d. Considering – the following actions for Sewer Maintenance Project No. 1 (Project No. 2733), which will upgrade sewer lines at six locations in Concord and one location in the City of Clayton:
1. Award of a construction contract in the amount of $2,178,433.75 to Ranger Pipelines Incorporated and authorizing up to a 10% contingency for contract change orders; authorizing the Mayor to execute the contract in a form acceptable to City Attorney (Funded by Sewer Enterprise Funds);
2. Approval of Task Order #4 with Ghirardelli Associates Inc. in the not-to-exceed amount of $335,475.56 to provide construction management, inspection, and materials testing services and authorizing the City Manager to execute the task order, in a form acceptable to the City Attorney (Funded by Sewer Enterprise Funds);
3. Approving related Sewer Enterprise budget transfers in the total amount of $1,200,000 from Downtown Sanitary Sewer Upgrade – Phase 4 (Project No. 2598); and
4. Authorizing the City Engineer to accept the improvements upon completion of Project No. 2733 and directing the City Clerk to file a Notice of Completion. Recommended by the Director of Community Development.
5 CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15273, 15378, 15301, 15302, 15304 and/or Public Resources Code 21065.
e. Considering – the following actions for the Camp Concord Maintenance Repairs to Buildings (Project No. 2533) located in South Lake Tahoe:
1. Award of a construction contract in the amount of $562,265.00 to D.G. Granade, Inc. and authorizing up to 10% contingency for contract change orders; and authorize the City Manager to execute the contract in a form acceptable to the City Attorney (Parkland and General Funds);
2. Approval of a budget transfer and appropriation in the amount of $410,000.00 from the Civic Center Roof Replacement (Project No. 2429), (General Fund); and
3. Authorizing the City Engineer to accept the improvements upon completion of the Camp Concord Maintenance Repairs to Buildings and directing the City Clerk to file a Notice of Completion. (Parkland Fund, Capital Projects Fund) Recommended by the Director of Community Development.
CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15273, 15378, 15301, 15302, 15304, and/or Public Resources Code Section 21065.
f. Considering – award of an on-call construction contract for On-Call Citywide Sewer Lateral Replacement & Sewer Main Spot Repair (Project No. 2244) to FJ&I Engineering Inc. for one year (with three one-year extensions possible) in the amount not-to-exceed $350,000 annually; and authorizing the City Manager to execute the contract in a form acceptable to the City Attorney. (Sewer Enterprise Fund) Recommended by the Director of Community Development.
CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15378, 15301, 15302, 15304, and/or Public Resources Code Section 21065.
g. Considering – the following actions to recruit and retain qualified employees:
1. Adopting a Resolution approving the negotiated terms and authorizing the City Manager to execute a three-year memorandum of understanding between the City of Concord and the Office and Professional Employees International Union Local 29 for the period of July 1, 2026, through June 30, 2029, and authorizing budget appropriations of $81,052 in Fiscal Year 2026-27; and
6 2. Adopting a Resolution approving the City of Concord’s Salary Schedule effective August 3, 2026, in accordance with the California Public Employees’ Retirement System (CalPERS) for a publicly available pay schedule. (General Fund) Recommended by the Director of Human Resources.
CEQA: Not a project/exempt pursuant to Public Resources Code Section 21065, California Code of Regulations Title 14 Sections 15016(b)(2), 15061(b)(3), 15273, and/or 15378(b)(4).
h. Considering – a Resolution authorizing an appropriation of $2.5 million from Measure V fund (Fund 125) to the Measure V Projects fund (Fund 490) for the Police Department / EOC Roof and Mechanical Systems Replacement Project (Project No. 2809 / PW-27-016), and approving budget transfers totaling $10.6 million from existing capital projects to fund projects included in the Two-Year Capital Budget for Fiscal Years 2027 and 2028. Recommended by the Director of Community Development.
CEQA: Not a project under Public Resources Code 21065 and CEQA Guidelines Section 15060(c)(2), 15061(b)(3), 15273, and/or 15378.
Public Hearing Item on the Consent Calendar
i. Considering – adoption of a Resolution pursuant to the Tax Equity and Fiscal Responsibility Act of 1982 (TEFRA) and the Internal Revenue Code of 1986 approving the issuance of California Municipal Finance Authority multifamily housing revenue bonds in an aggregate principal amount not-toexceed $75,000,000 for the purpose of financing or refinancing the acquisition, construction, improvement and equipping of Blue Oak Square Apartments, an existing 181-unit affordable multifamily rental housing project located at 2400 Willow Pass Road, Concord, California and certain other matters relating thereto. Recommended by the Director of Community Development.
CEQA: Not a project/exempt pursuant to CEQA Guidelines Sections 15060(c)(2), 15061(b)(3), 15273, 15378 and/or Public Resources Code Section 21065.
7 5. CITY COUNCIL PUBLIC HEARING
Persons who wish to speak on Public Hearings listed on the agenda will be heard when the public hearing is opened, except on public hearing items previously heard and closed to public comment.
After the public has commented, the item is closed to further public comment and brought to the Council level for discussion and action. Further comment from the audience will not be received unless requested by the Council. No public hearing shall commence after 10 p.m. unless approved by majority vote of the City Council. Please see “How to Submit Public Comments” above. a. Considering:
1. Introduction of an Ordinance amending Concord Municipal Code, Title 3 (Revenue and Finance), Chapter 3.10 (Purchasing), to make administrative and clarifying updates, align with current procurement practices, and to allow a design-build procurement procedure for public projects, by reading of the title only and waiving further reading.
2. Approval of a Resolution adopting a Policy and Procedure establishing guidelines for a standard organizational conflict-of-interest policy, applicable to design-build projects procured pursuant to Public Contract Code. Report by Margaret O’Brien, Finance Director.
CEQA: Exempt/not a project pursuant to Public Resources Code Sections 21065, 21080(b)(5), CEQA Guidelines Sections 15060(c)(2), 15061(b)(3), 15270, and/or 15378.
6. CORRESPONDENCE
Correspondence received at the City Council meeting will be listed here on the Annotated Agenda. a. Letter to Matt Kelly, Contra Costa Transportation Authority (CCTA) re:
Support for BART Countywide LED Lighting Upgrades Project - July 23, 2026 b. Letter to Matt Kelly, Contra Costa Transportation Authority (CCTA) re:
Support of the BART Countywide Wayfinding Improvements Project - July 23, 2026
c. Letter to Tim Haile, Executive Director, Contra Costa Transportation Authority re: Support and Partnership Commitment for the Countywide Smart Signals, Phase 2 Project - August 6, 2026
d. Letter to Assemblymembers Wicks and Farias re: SB 1164 (Cervantes) - Oppose Unless Amended - July 31, 2026
e. Letter to Contra Costa Transportation Authority Board of Directors re: Support for the City of Concord's Clayton-Galindo-Monument Multimodal Safety and Connections Project - August 6, 2026
f. Letter to Contra Costa Transportation Authority Board of Directors re: Support for the City of Concord's Cowell Road Class I Path Project - August 6, 2026 8 g. Letter to Federal Highway Administration re: Letter of Support for UCLA's "InfraShield" Proposal to the USDOT/FHWA Intersection Safety Systems Prototyping BAA, Solicitation No. 693JJ3-26-BAA-0004 - July 20, 2026
7. REPORTS AND ANNOUNCEMENTS
Closed Session Announcements
City Manager or Staff Reports
Council Reports
8. ADJOURNMENT
Next Meeting: Regular Meeting
Date: 8/25/2026 6:30 PM
9 NOTICE TO THE PUBLIC
There is a 90-day limit for the filing of a challenge in the Superior Court to certain City administrative decisions and orders which require a hearing by law, the receipt of evidence, and the exercise of discretion. The 90-day limit begins on the date the decision is final (Code of Civil Procedure §1094.6). Further, if you challenge an action taken by the City Council in court, you may be limited by California law to raising only those issues you or someone else raised in the hearing or in a written correspondence delivered to the City Council prior to or at the hearing.
In accordance with the Americans with Disabilities Act and California Law, it is the policy of the City of Concord to offer its public programs, services and meetings in a manner that is readily accessible to everyone, including those with disabilities. If you are disabled and require a copy of a public hearing notice, or an agenda and/or agenda packet in an appropriate alternative format; or if you require other accommodation, please contact the ADA Coordinator Tianjun Cao at (925) 671-3243 or [email protected], at least 24 hours in advance of the meeting. Advance notification within this guideline will enable the City to make reasonable arrangements to ensure accessibility.
CANAL REPLACEMENT
PROGRAM
President Ernesto Avila
General Manager Rachel Murphy
3.a
CCWD UPDATE 2
BOARD OF DIRECTORS
Ernesto A. Avila, P.E.
President
Division 3
Antonio Martinez
Vice President
Division 4
Daniel T. Fitzpatrick
Director
Division 2
Connstance Holdaway
Director
Division 5
Patt Young
Director
Division 1
CCWD UPDATE 3
SERVICE AREA
4 WATER JOURNEY
CCWD UPDATE
TODAY’S FOCUS:
Contra Costa Canal
CCWD UPDATE 5
CONTRA COSTA CANAL
MILITARY
OCEAN
TERMINAL
CONCORD
(MOTCO)
CANAL REPLACEMENT PROGRAM
CCWD UPDATE 6
CCWD UPDATE 7
WHAT IF WE DO NOTHING?
Water Quality
Protection
Treatment
Costs
Emergency
Repairs
Reliability
Risks
Increasing
Water Losses
Public Safety
Hazards
CCWD UPDATE
8 BENEFITS • Improve
Water Quality
• Improve
Reliability
• Increase
Water
Conservation
• Improve
Safety
• Cost-Effective
Conveyance
CCWD UPDATE 9
SCALE AND APPROACH
• 20 miles long
• 8- to 11-foot
diameter pipe
• Constructed
in phases
• Benefits will
span
generations
10 TRACK RECORD OF SUCCESS
Project
Project Cost (millions)
On Time
Budget Final
Los Vaqueros Reservoir $450 $448.7 Yes!
Los Vaqueros Reservoir Expansion $109.6 $108.6 Yes!
Middle River Intake $100 $98.9 Yes!
Multi-Purpose Pipeline $90.2 $86.3 Yes!
Canal Replacement Segment 5B $27.3 $26.1 Yes!
Canal Replacement Segments 3 & 4 $16.7 $15.4 Yes!
CCWD UPDATE
CCWD UPDATE 11
CANAL REPLACEMENT IN OAKLEY
CCWD UPDATE 12
FUNDING AND DELIVERY STRATEGY
• Pursue grants, loans, rate revenues, and other funding tools
• Phase work into buildable construction packages
• Use contractor input to improve constructability
• Manage cost, risk, customer impacts
CCWD UPDATE 13
WORKING WITH PARTNERS
• Minimize construction impacts
• Stormwater management
• Environmental review
• Securing permits
• Future uses of Right-of-Way
• Funding pursuits
CCWD UPDATE 14
SCHEDULE
Recommended Funding Strategy Spring 2027
Geotechnical and Utility Investigations Spring 2027
Complete 30% Design FY28
Programmatic Environmental Impact Report FY28
First Construction Package FY32
CCWD UPDATE
THANK YOU!
Questions?
Visit us online at ccwater.com/CanalReplacement
Call 925-688-8277
Connect with us!
Contra Costa Water District
@ContraCostaWaterDistrict
15
CCWD UPDATE
PIPELINE RENEWAL AND REPLACEMENT
17 $2,327,062
$3,973,933
$10,971,138
$7,909,741
$6,283,839
$0
$2
$4
$6
$8
$10
$12
FY17-18 FY19-20 FY21-22 FY23-24 FY25-26
Millions
CCWD Pipeline Renewal and Replacement Information
Concord Total Investment
REGULAR MEETING OF THE
CONCORD CITY COUNCIL/CITY COUNCIL
SITTING AS THE LOCAL REUSE AUTHORITY
CITY COUNCIL CHAMBER
1950 PARKSIDE DRIVE
CONCORD, CALIFORNIA AND VARIOUS
TELEPHONIC/ELECTRONIC LOCATIONS
TUESDAY, JUNE 23, 2026
The Concord City Council met in a regular meeting in the Council Chamber, located at 1950 Parkside Drive and via various telephonic/electronic locations at 6:30 p.m. on Tuesday, June 23, 2026, with Mayor Nakamura presiding. The pledge of allegiance was led by Councilmember Benavente.
Minutes follow in abbreviated form per Resolution 3361 and Council Minutes of September 26, 1966.
ROLL CALL
COUNCILMEMBERS PRESENT: Dominic Aliano, Pablo Benavente, Laura Hoffmeister Carlyn Obringer, Laura Nakamura
STAFF PRESENT: Jay Wilverding, City Manager; Susanne Brown, City Attorney; Justin Ezell, Assistant City Manager; Monique Robinson, Deputy City Clerk; Jeffrey Lara, Administrative Secretary; Greg Taylor, Director of Information Technology; Guy Bjerke, Director of Economic Development and Base Reuse; Jasmin Loi, Director of Human Resources; Kit Jory, Director of Public Works; Mindy Gentry, Director of Community Development; Mark Bustillos, Chief of Police; Steve Smith, Police Lieutenant; Mark Love, Human Resources Manager; Aaron Sage, Planning Manager;
Melissa Rea, Economic Development Manager; Sophia
Huckabay, Housing Manager; Carlton Thompson, City Engineer; Frank Abejo Principal Planner; Bruce Davis, Senior Civil Engineer; Aldrich Bautista, Associate Civil Engineer
MEMBERS OF THE PUBLIC
WHO ADDRESSED THE COUNCIL: Kayla Turnage, District Representative, Office of Assemblymember Avila Farias; Peter Carver Bennett, Concord; Tim McGallian, Greater Concord Chamber of Commerce;
D’Marco Anthony, Concord, Natalie
PUBLIC COMMENT PERIOD
Kayla Turnage, District Representative, Office of Assemblymember Anamarie Avila Farias, invited the Council to walk with Assemblymember Anamarie Avila Farias in the Fourth of July parade.
Peter Carver Bennett, Concord, spoke of the murder of a civil witness.
Tim McGallian, Greater Concord Chamber of Commerce, shared information about the upcoming Concord Fourth of July parade.
PRESENTATIONS
COMMEMORATING THE 80TH ANNIVERSARY OF DESEGREGATION OF THE UNITED STATES NAVY
Public comment was provided by Peter Bennett, Concord.
4.a
City Council Minutes June 23, 2026
2 ONE DAY AT A TIME PROGRAM UPDATE
Public comment was provided by Diego.
BUSINESS RECOGNITION AWARDS – Min’s Kitchen, Just Trains, and The Moulding Company No public comment was received.
ANNOUCEMENT
COMMISSION ON AGING RECRUITMENT
No public comment was received.
Deputy City Clerk Monique Robinson announced five positions on the Commission on Aging; four positions for the remainder of four-year terms ending June 30, 2027, and one position for the remainder of a four-year term ending June 30, 2029, and setting a deadline of Friday, July 24, 2026, at 5 p.m. for receipt of applications to the City Clerk.
CITY COUNCIL CONSENT CALENDAR
No public comment was received.
APPROVE MINUTES – June 9, 2026, Regular Meeting and June 11, 2026, Special Meeting A motion was made by Benavente and seconded by Hoffmeister to approve the minutes from the June 9, 2026, Regular Meeting and June 11, 2026, Special Meeting. The motion passed by unanimous vote of the Council.
APPROVE AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT – Robert Half Inc.
A motion was made by Benavente and seconded by Hoffmeister to approve the sixth amendment to Professional Services Agreement No. 3328 for financial, accounting, and administrative services with Robert Half Inc. in the amount of $95,000 for a not-to-exceed amount of $625,000 for the term of the agreement, extending the agreement for one year, and authorize the City Manager to execute the agreement in a form acceptable to the City Attorney. The motion passed by unanimous vote of the Council.
AWARD CONSTRUCTION CONTRACT AND ACCEPT IMPROVEMENTS – Oak Grove Fiber Project (Project No. 2781)
A motion was made by Benavente and seconded by Hoffmeister to:
1. Award a Construction Contract in the amount of $947,000 to St. Francis Electric, LLC and a 20% project contingency for contract change orders; and authorize the Mayor to execute the contract in a form acceptable to the City Attorney; and
2. Authorize the City Engineer to accept the improvements upon completion of Project No. 2781 and direct the City Clerk to file a Notice of Completion.
The motion passed by unanimous vote of the Council.
City Council Minutes June 23, 2026
3 APPROVE AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT – 3Di, Inc.
A motion was made by Benavente and seconded by Hoffmeister to approve an amendment to Professional Services Agreement No. CCA-6157 with 3Di, Inc. for an additional $10,000 for Fiscal Year (FY) 2025-2026, bringing the total not-to-exceed amount for FY 25-26 to $90,000, and the six-year contract total through FY 28-29 to $498,000, for the software platform to manage the City’s Rent Registry Program; and authorize the City Manager to execute the amendment in a form acceptable to the City Attorney. The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-43 – Calling for and Ordering a General Municipal Election This item was pulled from consideration on the Consent Calendar by Concord resident D’Marco Anthony.
Public comment was provided by Natalie.
A motion was made by Hoffmeister and seconded by Obringer to adopt Resolution No. 26-43 entitled, “A Resolution Calling for and Ordering a General Municipal Election and Specifications of the Election Order for the Purpose of Electing a Total of Three Members of the City Council to Seats in Districts 1, 3, and 5, one Member for each District, and the City Treasurer, each for Full Terms of Four Years, and Requesting and Consenting to the Consolidation of Said General Municipal Election with the General Election to be Held on November 3, 2026.” The motion passed by unanimous vote of the Council.
APPROVE SEVEN AGREEMENTS - Information Technology Systems A motion was made by Benavente and seconded by Hoffmeister to approve seven agreements involving annual license, maintenance, purchase and support for Information Technology systems in the total not-to-exceed amount of $1,748,590 for the 2026-27 Fiscal Year; and authorize the Director of Information Technology to execute the agreements and supporting documents in a form acceptable to the City Attorney. The motion passed by unanimous vote of the Council.
AWARD CONSTRUCTION CONTRACT, APPROVE BUDGET TRANSFER AND ACCEPT IMPROVEMENTS – Newhall Park Water Quality Improvement Project (Project No. 2353) This item was pulled from consideration on the Consent Calendar by Mayor Nakamura.
A motion was made by Aliano and seconded by Benavente to:
1. Award a Construction Contract in the amount of $2,846,101 to MidCal Dredging, Inc., and a 10% project contingency for contract change orders, and authorize the Mayor to execute the contract in a form acceptable to the City Attorney;
2. Approve budget transfers and appropriate $2,150,000 from various projects to this project to fully fund construction; and
3. Authorize the City Engineer to accept the improvements upon completion of Project No. 2353 and direct the City Clerk to file a Notice of Completion.
The motion passed by unanimous vote of the Council.
City Council Minutes June 23, 2026
4 ADOPT RESOLUTION NO. 26-44 – Accepting and Appropriating Funding for Mental Health Evaluation Team Services (MHET)
This item was pulled from consideration on the Consent Calendar by Councilmember Obringer.
Public comment was provided by Peter Carver Bennett, Concord.
A motion was made by Obringer and seconded by Benavente to adopt Resolution No. 26-44 entitled, “A Resolution Accepting and Appropriating Funding from the Contra Costa County Health Services in the Amount of $590,450 for the Concord Police Department’s Participation in a Joint Outreach Program for Mental Health Evaluation Team (MHET) Services, Approving an Interagency Agreement between the Contra Costa County Health Services and the City of Concord Police Department, and Authorizing the City Manager to Execute the Agreement in a Form Acceptable to the City Attorney.” The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-45 – Approving Final Map for Subdivision 9434, Walnut Grove A motion was made by Benavente and seconded by Hoffmeister to adopt Resolution No. 26-45 entitled, “A Resolution Approving the Final Map for Subdivision 9434, Walnut Grove, Assessor’s Parcel No. 147-251-017.” The motion passed by unanimous vote of the Council.
ADOPT RESOLUTIONS NO. 26-46 AND 26-47 – Declaring 1,000 Square Feet of Right of Way of Helena Drive and Approving Final Map for Subdivision 9676, Alcott Village A motion was made by Benavente and seconded by Hoffmeister to adopt Resolution No. 26-46 entitled, “A Resolution Declaring 1,000 Square Feet of Right of Way at the Southern End of Helena Drive to be Exempt Surplus Land Pursuant to Government Code Section 54221(f)(1)(E) and Taking Related Actions, Including the Subsequent Execution of a Quitclaim to Transfer the Exempt Surplus Property,” and
Adopt Resolution No. 26-47 entitled, “A Resolution Approving the Final Map for Subdivision 9676, Alcott Village, Including the Vacation of a Portion of Helena Drive.” The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-48 – Approving Street Name Tappin Loop for Alcott Village Subdivision, Subdivision No. 9676
The City Attorney noted a correction to Section 5 of the Resolution, reflecting Subdivision 9676 not Subdivision 9729.
A motion was made by Benavente and seconded by Hoffmeister to adopt Resolution No. 26-48 entitled, “A Resolution Approving the Street Name “Tappin Loop” for Alcott Village Subdivision, Subdivision No. 9676, Located at 5291 Concord Boulevard.” The motion passed by unanimous vote of the Council.
CITY COUNCIL CONSIDERATION ITEMS
CONCORD TOURISM IMPROVEMENT DISTRICTS 2024-2025 ANNUAL REPORT Guy Bjerke, Director of Economic Development and Base Reuse. introduced the item and then turned the presentation over to Beth Javens, Executive Director, Visit Concord.
Public comment was provided by Natalie.
City Council Minutes June 23, 2026
5 A motion was made by Obringer and seconded by Hoffmeister to adopt Resolution No. 26-49 entitled, “A Resolution Accepting the Concord Tourism Improvement District’s 2024-2025 Annual Report.” The motion passed by unanimous vote of the Council.
Mayor Nakamura recessed the meeting at 9:12 p.m. The meeting resumed at 9:22 p.m.
APPROVE AMENDMENT TO HOMELESS STRATEGIC PLAN GRANT – Hope Solutions Justin Ezell, Assistant City Manager, provided background on the item and handed the presentation over to Frank Abejo, Principal Planner, who presented the staff report.
Public comment was provided by Peter Carver Bennett, Concord.
A motion was made by Benavente and seconded by Aliano to approve an amendment to the Homeless Strategic Plan Grant Agreement with Hope Solutions to:
1. Modify Desk Clerk coverage as follows:
• Case Manager or Property Manager on site Monday through Friday from 9:00 a.m. to 5:00 p.m., except when off site for client-related activities. • Desk Clerk coverage Thursday through Sunday evenings from 6:00 p.m. to 2:00 a.m. • Resident Monitor coverage for 15 hours per week, Monday through Wednesday from 6:00 p.m. to 11:00 p.m. at a minimum wage.
2. Authorize staff to prepare a loan agreement for execution by the City Manager providing for a one-year deferral of Parkland fees following issuance of the Certificate of Occupancy.
3. Include a provision requiring Hope Solutions to provide a report on program operations one year after achieving full occupancy.
4. Extend the agreement for six additional years to January 2033.
The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-4735.5 – Approving a Three-Year Memorandum of Understanding between the City of Concord and Teamsters Local 856
Mark Love, Human Resources Manager, presented the staff report, noting that the Council would not be considering adoption of a Resolution approving a three-year Memorandum of Understanding between the City of Concord and the Office and Professional Employees International Union Local 29.
No public comment was received.
A motion was made by Aliano and seconded by Benavente to adopt Resolution No. 26-4735.5 entitled, “A Resolution Approving the Negotiated Terms and Authorizing the City Manager to Execute a Three-Year Memorandum of Understanding between the City of Concord and Teamsters Local 856 for the Period July 1, 2026, through June 30, 2029, and Authorizing Budget Appropriations of $220,324 in Fiscal Year 2026-27.” The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-4735.6 – Approving Base Wage Increases for Unrepresented Employees and the City Attorney, RESOLUTION NO. 26-50 – Amending Policy and Procedure No. 37.15, and RESOLUTION NO. 26-4735.7 – Approving the City of Concord’s Salary Schedule Effective July 1, 2026 Mark Love, Human Resources Manager, presented the staff report.
No public comment was received.
City Council Minutes June 23, 2026
6 A motion was made by Benavente and seconded by Obringer to adopt Resolution No. 26-4735.7 entitled, “A Resolution Approving the Following Base Wage Increases for Unrepresented Employees and the City Attorney: 3% Effective the First Pay Period after July 1, 2026, 3% Effective the First Pay Period after July 1, 2027, and 3% Effective the First Pay Period after July 1, 2028, Approving Adjustments to Payment of Healthcare Premiums for Confidential Employees, and Authorizing Budget Appropriations of $165,145 in Fiscal Year 2026-27;”
Adopt Resolution No. 26-50 entitled, “A Resolution Approving an Amendment to Policy and Procedure No. 37.15, Administrative Leave, and Other Non-Substantive Changes to Reflect Current Practice and Procedures;” and
Adopt Resolution No. 26-4735.7 entitled, “A Resolution Adopting the City of Concord’s Salary Schedule Effective July 1, 2026, in Accordance with the Requirements of the California Public Employees Retirement System (CALPERS) for a Publicly Available Pay Schedule.” The motion passed by unanimous vote of the Council.
CORRESPONDENCE
a. Agenda Item No. 3.b – One Day at a Time PowerPoint Presentation b. Agenda Item No. 5.c – Benched Correspondence
c. Agenda Item No. 5.e – Benched Correspondence
d. Agenda Item No. 6.a – Concord Tourism PowerPoint Presentation e. Agenda Item No. 6.b – Homeless Strategic Plan Grant Agreement Amendment PowerPoint Presentation
f. Agenda Item No. 6.d – Benched Exhibit A to Attachment 3 City of Concord Salary Schedule
COUNCIL REPORTS
AD HOC COMMITTEE – City of Concord’s Library
Mayor Nakamura created an ad hoc committee comprised of herself and Councilmember Benavente to evaluate the feasibility of expanding, relocating, or replacing the City’s library. The committee will exist until final recommendations are made to the full Council or until June 2027, whichever is sooner.
Councilmembers shared information on events and activities in which they had participated since the last meeting and commented on items of interest.
ADJOURNMENT
By order of the Mayor, the meeting was adjourned on June 23, 2026, at 10:59 p.m. in memory of Alan Smith.
LAURA M. NAKAMURA
MAYOR
MONIQUE ROBINSON
DEPUTY CITY CLERK
REGULAR MEETING OF THE
CONCORD CITY COUNCIL
CITY COUNCIL CHAMBER
1950 PARKSIDE DRIVE
CONCORD, CALIFORNIA AND VARIOUS
TELEPHONIC/ELECTRONIC LOCATIONS AND
THE BLACKSTONE AUTOGRAPH
COLLECTION, 636 SOUTH MICHIGAN
AVENUE, LOBBY, CHICAGO, ILLINOIS
TUESDAY, JULY 28, 2026
The Concord City Council met in a regular meeting in the Council Chamber, located at 1950 Parkside Drive and via various telephonic/electronic locations at 6:30 p.m. on Tuesday, June 28, 2026, with Mayor Nakamura presiding. The pledge of allegiance was led by Councilmember Hoffmeister.
Minutes follow in abbreviated form per Resolution 3361 and Council Minutes of September 26, 1966.
ROLL CALL
COUNCILMEMBERS PRESENT: Dominic Aliano, Pablo Benavente (via Zoom), Laura Hoffmeister Carlyn Obringer, Laura Nakamura
STAFF PRESENT: Justin Ezell, Assistant City Manager; Susanne Brown, City Attorney; Joelle Fockler, City Clerk; Monique Robinson, Deputy City Clerk; Jeffrey Lara, Administrative Secretary; Greg Taylor, Director of Information Technology; Mindy Gentry, Director of Community Development; Kit Jory, Director of Public Works, Margaret O’Brien, Director of Finance; James Nakayama, Police Captain; Robert Garcia, Police Lieutenant; Aaron Sage, Planning Manager; Frank Abejo, Principal Planner
MEMBERS OF THE PUBLIC
WHO ADDRESSED THE COUNCIL: Vanessa Chena, Monument Impact/CIPN; Raul Araua, United Latino Voices; Glenda Navarro, Todos Santos Tenants United; Amy Acceola, CIPN; Gwynne Gilson, Concord; Kathryn DurhamHammer, Concord; Robyn Kuslits, Concord
PUBLIC COMMENT PERIOD
Vanessa Chena, Monument Impact/CIPN, requested agendizing a discussion to include community input on City of Concord implementation regarding SB 580.
Raul Araua, United Latino Voices, requested that the City Council make Concord an ICE-free city.
Glenda Navarro, Todos Santos Tenants United, spoke about lack of street repairs on Eureka Lane and issues with submitting requests via Concord Connect Amy Acceola, CIPN, requested that the City Council establish a framework for responding to ICE activity.
Gwynne Gilson, Concord, requested the City to agendize a discussion to evaluate whether City policies and procedures meet the standards of SB 580.
Kathryn Durham-Hammer, Concord, asked the City for implementation of the requirements of SB 580.
City Council Minutes July 28, 2026
2 CITY COUNCIL CONSENT CALENDAR
No public comment was received.
APPROVE PROFESSIONAL SERVICE AGREEMENT – FCS International, Inc. dba FirstCarbon Solutions
This item was pulled from consideration on the Consent Calendar by Councilmember Obringer.
A motion was made by Obringer and seconded by Hoffmeister to approve a professional services agreement with FCS International, Inc. dba FirstCarbon Solutions in an amount not-to-exceed $356,164 to prepare an environmental impact report for the Concord Townsquare Project on the former Coast Guard property at 3295 Haleakala Street and authorize the City Manager to execute the agreement in a form acceptable to the City Attorney. The motion passed by unanimous vote of the Council.
ADOPT RESOLUTION NO. 26-51 – Accepting and Appropriating Grant Funding for Cannabis Tax Fund Grant Program
A motion was made by Hoffmeister and seconded by Aliano to adopt Resolution No. 26-51 entitled, “A Resolution Accepting and Appropriating Grant Funding to Fund 402 from the California Highway Patrol (CHP) in the Amount of $296,197 for the Cannabis Tax Fund Grant Program (CTFGP) to Assist with Reducing and Mitigating the Impacts of Impaired Driving in the City of Concord.” The motion passed by unanimous vote of the Council.
CITY COUNCIL CONSIDERATION ITEM
ADOPT RESOLUTION NO. 26-52 – Calling for and Giving Notice on Proposed Business License Tax Simplification Ballot Measure
Public comment provided by Robyn Kuslits
A motion was made by Aliano and seconded by Benavente to adopt Resolution No. 26-52 entitled, “A Resolution Calling for and Giving Notice of a November 3, 2026, Election on a Proposed Business License Tax Simplification Ballot Measure; and Establishing the Policies and Procedures for Such an Election and Requesting that the County of Contra Costa Conduct Such an Election.” The motion passed by unanimous vote of the Council.
CORRESPONDENCE
a. Letter to Assemblymember Blanca Pacheco re: Assembly Bill 1821 – California Public Records Act: Methods of Submission, Fees, and Agency Response Time – Support (as amended June 10, 2026) – June 17, 2026
b. Agenda Item No. 3.a – Benched Correspondence
c. Agenda Item No. 4.a. – Business License Simplification Ballot Measure PowerPoint Presentation
COUNCIL REPORTS
Councilmember Obringer provided an update on the Green Empowerment Zone Board.
Mayor Nakamura provided an update on Marin Clean Energy Councilmembers shared information on events and activities in which they had participated since the last meeting and commented on items of interest.
City Council Minutes July 28, 2026
3 ADJOURNMENT
By order of the Mayor, the meeting was adjourned on July 28, 2026, at 8:11 p.m. in memory of former Director of Public Works William Tarbox.
LAURA M. NAKAMURA
MAYOR
JOELLE FOCKLER, MMC
CITY CLERK
SPECIAL MEETING OF THE
CONCORD CITY COUNCIL
CITY COUNCIL CONFERENCE ROOM
1950 PARKSIDE DRIVE, WING A
CONCORD, CALIFORNIA
TUESDAY, JULY 28, 2026
The Concord City Council met in a special meeting in the City Council Conference Room, located at 1950 Parkside Drive, Wing A, Concord, California at 6:00 p.m. on Tuesday, July 28, 2026, with Mayor Nakamura presiding and Councilmember Benavente absent. Minutes follow in abbreviated form per Resolution 3361 and Council Minutes of September 26, 1966.
No public comment was received.
A closed session was held on CONFERENCE WITH LABOR NEGOTIATORS PURSUANT TO GOVERNMENT CODE SECTION 54957.6 Agency designated representatives: Jay Wilverding, City Manager; Jasmin Loi, Director of Human Resources; Lisa Charbonneau, Esq., Liebert Cassidy Whitmore Employee organizations: Professional Representation Unit of OPEIU Local 29.
ADJOURNMENT
By order of the Mayor, the meeting was adjourned on July 28, 2026, at 6:25 p.m.
LAURA M. NAKAMURA
MAYOR
JOELLE FOCKLER, MMC
CITY CLERK
Staff Report
Date: August 11, 2026
To: City Council
From: Joelle Fockler, MMC, City Clerk
Prepared by: Monique Robinson, Deputy City Clerk
[email protected]
(925) 671-3295
Subject: Considering the appointment of Brian Capurro to the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029, as recommended by the Council Committee on Youth and Education
(Hoffmeister/Obringer).
Report in Brief
Considering the appointment of Brian Capurro to the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029, as recommended by the Council Committee on Youth and Education (Hoffmeister/Obringer).
Recommended Action
Appoint Brian Capurro to the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029, as recommended by the Council Committee on Youth and Education (Hoffmeister/Obringer).
Background
In accordance with Policy and Procedure No. 89, an announcement was made on April 14, 2026, to fill an unscheduled vacancy on the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029, due to the resignation of Michael Miller effective March 26, 2026. Applications were due to the City Clerk on Friday, May 15, 2025, at 5 p.m.
The Parks, Recreation and Open Space Commission is made up of five adult members that serve four-year terms and two youth members that serve a one-year term.
4.b
City Council Agenda Report
Agenda Item No. 4.b
August 11, 2026
Members must be residents of Concord who hold no other municipal office in the City of Concord. The youth members are appointed by the adult members. The Commission advises the City Council on matters related to public parks, open space, recreation, and youth; reviews and recommends Council action to develop, modify, and/or improve City parks; promotes recreation and park programs, assesses park and recreation needs, and recommends capital improvement projects and fees.
The City's Conflict of Interest Code requires the Parks, Recreation and Open Space Commission members to complete a Conflict of Interest Form 700. Filings are required within 30 days of assuming office and on an annual basis.
A total of nine applications were received, and all applicants qualified to be interviewed.
Jessica Navarrete withdrew her application on June 12, 2026, and Benjamin Potter did not interview. Interviews were held on Tuesday, June 16, 2026, by the Council Committee on Youth and Education (Hoffmeister/Obringer). The applicants interviewed were Robert Ashley, Robert Bagley, Michelle Brown, Brian Capurro, Lance LeDrew, Matthew Lewis, and Kemberly Lopez.
The Council Committee on Youth and Education recommends the appointment of Brian Capurro to the Parks, Recreation, and Open Space Commission for the remainder of a four-year term ending June 30, 2029.
Public Contact
The City Council Agenda was posted.
Attachment
1. Application Packet (Redacted)
Attachment 1
Application
Robert Ashley / as of: 4/16/2026 1 of 4
Department: City of Concord
Parks, Recreation and Open Space Commission
ROBERT L. ASHLEY
Title: Commission Member
SUMMARY
Uniquely experienced planner and crisis management specialist. Between 20 years of leadership assignments in the Army (14 in the Special Forces community), and over 8 years at FEMA Region 9 as a Senior Watch Officer, I have developed a track record of building high-performing teams, planning and executing operations at tactical and operational levels, leading teams through crisis management, and engaging/aiding troubled communities with consequence management. My free time is dedicated to volunteering as a Scoutmaster with my son’s Scouting America Troop; mentoring youth to become good citizens and future leaders.
Military: Retired Major (O4) with 20 years of service (US Army & CA Army National Guard) / 10-point Vet Pref eligible Federal: GS-13-6 with FEMA Region 9 Headquarters
Clearance: DHS Top Secret with SCI
CORE QUALIFICATIONS
• Extensive experience in both deliberate planning and crisis action planning, using the National Incident Management System, Military Decision-Making Process, and Joint Operational Planning Process. • Combat-tested leadership in dynamic situations requiring quick decisions and analysis of complex issues. • Emergency Operations Center (EOC) / Joint Operations Center (JOC) and Regional Response Coordination Center (RRCC) experience in both domestic (FEMA) and foreign situations (Iraq and Afghanistan), focused specifically on fusing multimodal intelligence (classified and unclassified) and leveraging technology such as Geospatial Information Systems (GIS) to make key operational decisions.
• Proven capabilities in logistical planning and organizational management across continents • Professional verbal and written communications – experience addressing USAMB, foreign military officials, colleagues and superiors at the Director level and above both internal and external to the organization.
RECENT EXPERIENCE:
Senior Watch Officer / Emergency Management Specialist (Response) GS-13 / PFT September 2019 – Present Watch Officer / Emergency Management Specialist (Response) GS-12 / PFT August 2017 – September 2019 DHS, Federal Emergency Management Agency, Region 9 Headquarters Oakland, CA Serves as a Senior Watch Officer in the FEMA Region 9 Headquarters, providing 24/7 situational awareness throughout the region, including California, Arizona, Nevada, Hawaii, Guam, and other US interests in the Pacific.
Performs other emergency management tasks including coordinating efforts between Federal Agencies and Region 9’s State, Local, Territorial, and Tribal (SLTT) partners, conducting mission-oriented analysis of disaster/hazard information to enable FEMA Region 9 leadership to take informed, decisive action in an emergency. Responsible for implementing HQ and Regional emergency management standards, regulations, practices, training, and procedures to identify, minimize or eliminate hazards/threats within the Region 9 Watch Center. • Accepted additional duty as the FEMA Region 9 OET (Office of Emerging Threats) Coordinator, responsible for maintaining critical relationships with appropriate Federal and SLTT partners to streamline planning and response efforts associated with CBRN (Chemical, Biological, Radiological, Nuclear) and other threats in the Region. • Served on numerous occasions as the information focal point for FEMA Response operations as disasters ranging from California wildfires, Pacific typhoons, and earthquakes occurred.
EDUCATION
United States Army John F Kennedy Special Warfare Center and School 2008 – 2010 Special Forces Qualification Course Fort Bragg, NC
United States Military Academy at West Point 2000 – 2004 B.S. in Engineering Management, Concentration in Mechanical Engineering (GPA: 3.11) West Point, NY
Robert Ashley / as of: 4/16/2026 2 of 4
ADDITIONAL INFORMATION
• Marital Status: Married with children 18 and 13 years old • Interests: Travel, Skiing, Scouting (Scoutmaster), Youth Sports (HS & CYO Track & Cross Country) • Languages: English (native); Arabic (intermediate); German (intermediate) • Military Awards/Decorations: Defense Meritorious Service Medal (2); Bronze Star Medal (2); Meritorious Service Medal (2); Army Commendation Medal (3); Combat Infantryman Badge; Special Forces Tab; Ranger Tab; Sapper Tab; Senior Parachutist Badge; Estonian, Romanian, Spanish, and Chilean Parachutist Badges. • Combat Deployments: 3x deployments (33 months) to Iraq in support of Operation Iraqi Freedom, Operation New Dawn, and Operation Inherent Resolve / 1x deployment (9 months) in Afghanistan in support of NATO Resolute Support Mission
PRIOR EXPERIENCE:
Director of Plans (J-5) / Liaison Officer to CJTF-OIR MAJ / O-4 September 2022 – August 2024 Special Operations Detachment – North (SOD-N) / USASOC – (CA National Guard) JFTB Los Alamitos, CA Special Operations Advisory Group (Iraq) / Operation Inherent Resolve Baghdad, Iraq Develops long-range contingency and training plans in support of United States Army Special Operations Command (USASOC), Special Operations Command – North (SOCNORTH) and State of California strategic operations, exercises, and initiatives. Responsible for planning and resourcing exercises and operations 12-48 months in advance.
Focused on Special Operations Forces (SOF) interoperability with Joint, Interagency, Multi-National (JIM) partners.
Deployed to Baghdad, Iraq in support of Operation Inherent Resolve to serve on the Special Operations Advisory Group (SOAG) staff, responsible for the Special Operations Advisory mission throughout Iraq. • Provided direct support to the Iraqi Minister of Counterterrorism/Commander of the Iraqi Counterterrorism Service (CTS) during weekly engagements covering parliamentary advocacy, funding, force generation, operational employment, and strategic initiatives.
• Selected to represent the SOAG Commander to Combined Joint Task Force Operation Inherent Resolve (CJTF-OIR), the Joint, Multi-National Headquarters in charge of the Coalition advisory mission in Iraqi and Syria, through daily engagement with the Deputy Commander of CJTF-OIR (BG).
• Retired from the California Army National Guard in August 2024.
Special Forces Company Commander, MAJ / O-4 October 2020 – August 2022 19th Special Forces Group (Airborne) JFTB Los Alamitos, CA Commander of a 120-man Special Forces Company prepared to support unilateral, joint, and combined training and operations in support of United States Special Operations Command’s (USSOCOM) objectives in peace, conflict, or war, as well as the State of California’s objectives during state emergencies. Specialized in Unconventional Warfare, Foreign Internal Defense, Special Reconnaissance, Direct Action, and Defense Support of Civil Authorities (DSCA).
Manages recruiting, retention, training, operational planning, resourcing, and execution of critical missions across the spectrum of conflict.
• Rapidly mobilized Special Forces elements on Emergency State Active Duty in support of the California Military Department’s response to civil unrest following the death of George Floyd, to serve as a rapidly deployable situational assessment and critical communications element.
• Resourced and supervised the execution of three Bi-Lateral training events with the Thai, Nepalese, and South Korean Special Operations Forces.
• Maintained 100% accountability of over $27 Million of military equipment.
Director of Operations (J-3) MAJ / O-4 November 2018 – September 2020 Special Operations Detachment – North (SOD-N) / USASOC (CA National Guard) JFTB Los Alamitos, CA Executes Special Operations plans and policies in support of United States Army Special Operations Command (USASOC), Special Operations Command – North (SOCNORTH) and State of California strategic operations, exercises, and initiatives. Responsible for planning, resourcing, and executing Inactive Duty Training (IDT), Annual Training (AT), exercises and operations in support of national security. Focused on Special Operations Forces (SOF) integration in joint and interagency operations.
• Selected to serve in a position of increased responsibility above current pay grade (MAJ / O-4 in an LTC / O-5 billet) • Routinely represents the Commander (O-6) as necessary to outside organizations to plan, resource, and implement training for SOD-N and operations in support of USASOC, SOCNORTH, and the State of California.
Robert Ashley / as of: 4/16/2026 3 of 4
SOAT Commander / Lead Mentor / Camp Commander MAJ / O-4 February 2018 – October 2018 Special Operations Detachment – North (SOD-N) / USASOC – (CA National Guard) ANASOC Special Operations Advisory Group / NATO Resolute Support Mission Kabul, Afghanistan Commander of a Special Operations Advisory Team (SOAT) responsible for Training, Advising, and Assisting (TAA) the Afghan National Army Special Operations Command (ANASOC) Special Forces Qualification Course (SFQC) and 2x Special Forces Kandaks (SFK). Responsible for the safety, security, and mission success of ~140 soldiers and contractors living on a small Forward Operating Base in Kabul, Afghanistan. • Provided direct daily mentorship to 3x Afghan O-5 Kandak Commanders. Through this habitual interaction, influenced all aspects of the Afghan Special Forces elements including institutional development, selection and training of new operators, operational employment, and strategic initiatives. • As the subject matter expert on Afghan Special Forces growth and operational employment, provided key briefings and recommendations directly to the Commander (MG) of NSOCC-A (NATO Special Operations Component Command – Afghanistan).
Deputy Director of Operations (A/J-3) October 2015 – January 2018 Special Operations Detachment – North / USASOC (CA National Guard) Los Alamitos, CA Executes Special Operations plans and policies in support of Special Operations Command – North (SOCNORTH) and State of California strategic operations, exercises, and initiatives. Responsible for planning, resourcing, and executing Inactive Duty Training (IDT), Annual Training (AT), exercises and operations in support of national security.
Focused on Special Operations Forces (SOF) integration in joint and interagency operations. • Developed working relationships with interagency partners including FEMA to coordinate response during interagency National CAPSTONE exercise focused on Defense of the Homeland (2016). • Prepared unit contingency plan in support of Defense Support of Civil Authorities mission to aid personnel recovery efforts during Oroville Dam Spillway incident (2017).
Senior Account Executive, Electrical & Mechanical Reliability – Northern California January 2014 – July 2017 Siemens Industry, Inc. / Building Technologies Division San Francisco Bay Area, CA Lead Sales Executive responsible for building and sustaining the Electrical and Mechanical Service business lines across Northern California for Siemens, Building Technologies Division. • Recognized for developing the most new-customers in the San Francisco Branch 2 years in a row, with 16 in FY 2014 and 20 in FY 2015.
• Drove consistent year over year growth – 572% from FY14 to FY15 • Fostered excellent relationships with customers, receiving top marks on customer relationship surveys, contributing to an overall rating of 9.17 out of 10.
• Built strong internal relationships within the Sales and Operations teams, as well as with other business lines, driving additional opportunities through cross-selling.
• Successfully negotiated favorable terms with preferred vendors, leading to increased competitive advantage, customer value, and profitability due to reduced operational expenses.
Special Forces Operational Detachment – Alpha (SFODA) Commander October 2013 – October 2015 19th Special Forces Group (Airborne) – (CA National Guard) Los Alamitos, CA Commander of a 12-man Special Forces Operational Detachment - Alpha (SFOD-A) prepared to support unilateral, joint, and combined training and operations in support of United States Special Operations Command’s (USSOCOM) objectives in peace, conflict, or war, as well as the State of California’s objectives during state emergencies. Specialized in Unconventional Warfare, Foreign Internal Defense, Special Reconnaissance, Direct Action, and Defense Support of Civil Authorities (DSCA).
• Led the reconstitution of Maritime Operations capability in the A/5/19th Special Forces Company in the California National Guard. Developed plans to align resources, personnel, and training to reestablish a nascent specialty capable of providing support to State of California DSCA efforts as well as supporting A Company’s federal mission in support of USASOC (United States Army Special Operations Command). • Commended for performance during an Unconventional Warfare exercise for engagement and influence with simulated regional leadership resulting in strategic level implications within the exercise.
Special Forces Company Executive Officer July 2012 – October 2013 10th Special Forces Group (Airborne), US Army Estonia / Romania / Fort Carson, CO Second-in-Command of a 90-man Special Forces Company. Directed and supervised all Company staff (12 personnel). Responsible for the company's training and operational support, logistical requirements, budget, and administration with missions across the Trans-Sahel region of Africa and throughout Central and Eastern Europe.
Robert Ashley / as of: 4/16/2026 4 of 4
• Planned and resourced the logistical support to deploy and command and control (C2) ten operational units across the globe; three simultaneous deployments to the Trans-Sahel region of Africa; and seven deployments across Central and Eastern Europe.
• Selected as the lead US planner for a bi-lateral Estonian National Defense exercise focusing on the integration of NATO Special Operations Forces with conventional units. Recognized by Defense Attaché for seamless interagency integration and coordination.
• Developed and executed a complex training exercise to prepare Romanian Special Operations Task Group 3 (140 soldiers) to deploy to Afghanistan in support of NATO International Security Assistance Forces. • Developed a personnel and logistics tracking mechanism that was adopted by the Special Operations Command – Europe (SOCEUR) Joint Movement Operations Center as the new standard for all forces deploying into the European theater.
• Managed company budgets for training and operations, travel, and Joint Combined Exercise Training (JCET) events, exceeding $1 Million.
Special Forces Operational Detachment – Alpha (SFODA) Commander June 2010 – July 2012 10th Special Forces Group (Airborne), US Army Baghdad, Iraq / Romania / Fort Carson, CO Commander of a 12-man Special Forces Operational Detachment - Alpha (SFOD-A) prepared to support unilateral, joint, and combined training and operations in support of United States Special Operations Command (USSOCOM) objectives in peace, conflict or war. Specialized in Unconventional Warfare, Foreign Internal Defense, Special Reconnaissance and Direct Action. Led detachment during an 8-month tour in support of Operation New Dawn in Baghdad, Iraq. Fused intelligence from disparate sources with operations across the Greater Baghdad Area. • Mentored the 1st Brigade, Iraqi Special Operations Forces (ISOF) – Reconnaissance Commander on evidence-based operations, intelligence collection and analysis, during an eight-month deployment to Baghdad, Iraq. Combined USIraqi efforts facilitated over 50 ISOF operations, resulting in the detention of over 90 targeted individuals. • Utilized proficiency in Arabic language in daily interaction with senior Iraqi leaders to streamline the Iraqi targeting cycle, reducing time from target submission to operational execution from months to weeks. Efforts to focus intelligence collection on producing valid warrants also increased the percentage of detainee convictions in the Iraqi judicial system.
• Advised the 6th Romanian Special Operations Forces Brigade Commander and subordinate elements for two months on force management and institutional development, long range planning, long term acquisitions strategy, and methods to improve the selection and qualification courses within the Romanian Special Forces. • Trained Romanian Special Operations Task Group 2 (100 soldiers) on warrant-based and intelligence-driven operations, and the latest tactics, techniques, and procedures to prepare them for combat operations on a six-month deployment to Afghanistan.
Infantry Rifle Platoon Leader / Company Executive Officer June 2005 – April 2008 82nd Airborne Division, US Army Salah ad Din Province, Iraq / Fort Bragg, NC Platoon Leader of a 40-man Airborne Infantry Platoon (18 months) and subsequently Second-in-Command of a 140- man Airborne Infantry Company (15 months) with a no notice, worldwide deployment capability within 18 hours of notification. Responsible for coordination with staff elements across multiple organizations to manage administrative and logistical support for the company in training and combat. Deployed to Iraq in support of Operation Iraqi Freedom.
Mobilized in support of Hurricane Katrina Relief efforts. • Resourced and deployed Bravo Company (140 soldiers), with no notice, from Patrol Base Woodcock in Ad Dawr to Baqubah, Iraq (over 100 miles) during the surge in Operation Iraqi Freedom. Meticulously planned for and provided logistical support for 10-day sustained clearance operations and two major air assault missions while working for three different Battalion Headquarters.
• Synchronized engineer and logistics assets from multiple echelons across 50km of dangerous terrain to build a company patrol base (Patrol Base Woodcock) in less than a month in Ad Dawr, Iraq. • Planned and executed over 300 reconnaissance, direct action, and presence patrols during combat operations in Tikrit, Samarra, and Ad Dawr, Iraq, resulting in the detention of over 50 anti-Iraqi insurgent forces, removal of over 75 caches, and increased safety along major lines of communication throughout Salah ad Din Province. • Recognized by the Commanding General of the 82nd Airborne Division twice for excellence through the Outstanding Junior Officer Program; once as the best Platoon in the Battalion during a complex Platoon live fire culmination exercise, and again for developing a company training event that raised the standard for subsequent events. • Awarded the Louisiana Emergency Service Medal and an Army Commendation Medal for demonstrated leadership while mobilized to New Orleans in support of Hurricane Katrina relief efforts. Rescued 12 citizens trapped in flooded areas of New Orleans and contributed to the evacuation of over 3500 victims to safety.
Application
Upload a Resume
Question applies to multiple boards
Describe prior service on a board, commission, or any other community service or public body, indicate agency and explain what significant contributions you made:
Served on the Economic Development Committee for San Pablo, where I was a homeowner in the past. New Leaf Services for LGBTQ people with mental Health and drug abuse issues Please state your reason for applying, including qualifications for this position:
I love the parks in the East Bay and they are clearly a vital part of life in Concord. I also believe my connection with visit Concord does have a direct link with tourism and visitors to Concord.
Considering your experience and activities in business, labor, professional, social, or other organizations, indicate the experience, technical training, and/or skills which qualify you for an appointment:
Great awareness of political issues.
How did you hear about this opening?
None Selected
TERMS OF ACCEPTANCE and SIGNATURE
Question applies to multiple boards
I, applicant for a City of Concord Board, Commission or Committee, warrant the truthfulness of the information provided in this application. I certify under penalty of perjury that I am a resident of the City of Concord and meet the eligibility requirements.
Matthew Lewis
Application
CITY OF PALO ALTO August 2022 to November 2023
Program Assistant II
Coordinated and monitored work assignments of temporary/volunteer staff; coordinated volunteer activities, scheduled appointments, screened calls; received visitors, and responded to inquiries.
Acted as liaison with City programs and managerial staff, contractors, community groups and local businesses associated with the assigned programs and projects; Responsibilities included conducting tours and workshops, and meeting attendance; Assisted with the development of the budget; monitored program budget, identified and analyzed trends; Provided regular and specialized reporting; Prepared and tracked payments, purchase requisitions and contracts; Coordinated facility bookings, scheduling, rental process and computerized registration processes where applicable; Taught and developed classes, camps and workshops and coordinated various trainings for programs depending on area of assignment; Developed and prepared evaluations, educational materials, press releases, advertising, and other promotional material for distribution to newspapers, radio, internet, and community organizations; Conducted research for use in the specified areas of assignment in development of material used in reports, promotional materials, design, or dissemination of information to the public; Facilitated the preparation, interpretation and implementation of administrative policies and procedures affected by the assigned programs or projects; Performed calculations, compiled data and wrote reports analyzing and summarizing data; prepared graphs and charts where applicable; Maintained program/project documents according to the processes of the assigned department; Coordinated/scheduled/mentored in-house and outreach programming, customers, hourly and temporary staff, instructors and camp staff; Coordinated support services to produce materials for and set up displays, workshops, classes, and talks; arranged for rooms and speakers; spoke to groups and conducted workshops as required; Typed from draft or oral instructions or composed correspondence and staff, statistical or numerical reports; Filed program related documents, correspondence, reports and other materials; Utilized specialized software applications to assist with department related programs; Answered department communication concerning training, job interest and career development; Acted as liaison for all department training facilities, equipment and materials; Assisted manager with analyses related to staffing requirements and the preparation of job descriptions and justifications for personnel additions and changes; Acted as liaison between managers and other City departments; Scheduled meetings and prepared meeting minutes; Developed and implemented forms, memos, correspondence, and informational materials.
CITY OF PALO ALTO May 2022 to August 2022
Program Assistant I
Acted as receptionist, and coordinator of volunteer activities, meetings, classes, and facility rentals, schedule appointments, screen calls; receives visitors, and respond to inquiries; Act as liaison with City programs and managerial staff, contractors, community groups and local businesses associated with the assigned programs and projects; Establish and maintain a system of monitoring and reporting on the status of the assigned program; Prepare and track payments, purchase requisitions and contracts, purchasing forms; Coordinate facility booking, scheduling, rental process and computerized registration processes where applicable; Perform calculations, compile data and write reports analyzing and summarizing data; prepare graphs and charts where applicable; Coordinate/schedule/mentor in-house and outreach programming, customers, hourly and temporary staff, instructors and camp staff; Coordinate support services to produce materials for and set up displays, workshops, classes, and talks; arrange for rooms and speakers needs; Within established parameters, interpret various department rules, policies and procedures of assigned program.
CITY OF PALO ALTO November 2020 to May 2022
Storekeeper I
Provide excellent customer service to various public works city employees, by taking and fulfilling their orders and answering any queries they may have; Reorder all stocked items that are issued out to city departments; Convey materials and items from receiving area to storage area; Sort and place inventory in storage areas, shelves or in bins according to predetermined sequence such as size, type, or product code; Mark materials or containers with identifying information; Fill requisitions for materials and assist in inventory taking; Keep records of materials or items (including surplus materials) received, shipped or distributed in accordance with established procedure; Make daily data entries for accurate inventory controls including receiving, shipping and disposal functions; Act as liaison with Purchasing Department for ordering supplies and materials.
CITY OF PALO ALTO Oct 2018 to July 2020
Program Assistant I
Acted as receptionist, and coordinator of volunteer activities, meetings, classes, and facility rentals, schedule appointments, screen calls; receives visitors, and respond to inquiries; Act as liaison with City programs and managerial staff, contractors, community groups and local businesses associated with the assigned programs and projects; Establish and maintain a system of monitoring and reporting on the status of the assigned program; Prepare and track payments, purchase requisitions and contracts, purchasing forms; Coordinate facility booking, scheduling, rental process and computerized registration processes where applicable; Perform calculations, compile data and write reports analyzing and summarizing data; prepare graphs and charts where applicable; Coordinate/schedule/mentor in-house and outreach programming, customers, hourly and temporary staff, instructors and camp staff; Coordinate support services to produce materials for and set up displays, workshops, classes, and talks; arrange for rooms and speakers needs; Within established parameters, interpret various department rules, policies and procedures of assigned program.
CITY OF SAN FRANCISCO PARKS & RECREATION Dec 2016 to Oct 2018 Level II Recreation Leader
Perform facility/event management, light office tasks, customer service duties, set up and take down of tables and chairs, occasional janitorial tasks; assists with program delivery, perform related duties as required.
CITY OF HALF MOON BAY Sept 2017 to Oct 2018
Level III Building Attendant
Perform facility/event management, light office tasks, customer service duties, monitor activities during facility rental, occasional janitorial tasks; accept and file facility rental paperwork, perform related duties as required.
CITY OF PALO ALTO Sept. 2017 to Oct 2018
House Manager
Perform facility/event management for Art Center, customer service duties, provide general event support and troubleshooting for building rentals, set up and take down of tables and chairs, perform related duties as required.
CITY OF SAN JOSE Oct. 2017 to Oct 2018
Events Captain
Perform facility/event management for the Rotunda, one of the most recognizable and modern pieces of architecture at San José City Hall, customer service duties, provide general event support and troubleshooting for building rentals, crowd control, perform related duties as required.
CHILDREN’S MUSICAL THEATER SAN JOSE Aug 2010 to Aug 2011 Production Manager
Responsible for of all technical elements, design and artistic oversight, equipment, set materials, personnel, budget and volunteers, as well as function as the on-site CMT representative, throughout the rehearsal and performance periods for one of the nation’s largest youth musical theater and training program. Other responsibilities include:
• Collaboration with the artistic director to build and maintain season calendar and individual show calendars.
• Liaison to facilities personnel, IATSE Union labor and Team San Jose/city. • Recruitment of new production staff and designers as well as conducting staff orientation sessions and meetings for each show.
• The development and management of a set and prop rental program to generate extra revenue.
SWANK AUDIO VISUAL Jul 2007 to Aug 2008
Technical Director
Responsible for the planning, organizing and management of all AV technical requirements and the training, supervision, and development of technical support staff - including the set-up and operation of high-end equipment for trade shows, special events and corporate meetings hosted at the Westin St.
Francis and Marriott Marquis hotels. Other duties include:
• Client liaison to the hotel’s Sales, Catering, Banquet and Convention Services Departments, and technical consultant to all necessary hotel personnel with the development and execution of innovative and effective solutions for client events.
• Worked closely with Swank sales managers during proposal stage of large programs.
ORGANIZED CHAOS EVENT MANAGEMENT / GLOW LIGHTING DESIGN 2001 to 2018 Event Planner, AV Director & Lighting Designer/Owner
• Developed and produced client concepts into professional, high-end private and corporate events. Provided customized theme-environments through creative audio and lighting designs. • Assisted with all stages of event including the development and management of project timelines, the hiring of all service vendors, and site contract negotiations.
EDUCATION:
UNIVERSITY OF ALBERTA, Bachelor’s Degree in Education; English Major 1995 to 1998
Application
Kemberly Lopez
WORK EXPERIENCE
Energy Solutions Oakland, CA Project Manager June 2023 - Present Associate January 2022 - June 2023
● Aligned the PM Checklist with PMO practices and audited 30+ projects, then sent project managers their results with feedback on how to improve.
● Supported migration of PM Checklist workflows from SharePoint to Monday.com by mapping processes, creating FAQ guidance, and leading Office Hours to help answer questions regarding the change. ● Served as a Workday Change Champion and led phase 1 UAT support, translating complex system changes into clear guidance to minimize risk and ensure a smooth go-live experience. ● Strengthened reporting, distributor tools, surveys, and market communications through advanced Excel validations, reusable templates, and updated program materials that improved accuracy and client confidence. ● Supported training and onboarding for teammates by documenting workflows, clarifying roles, and improving process adaptation across shared tools like Monday.com.
Bank of America Walnut Creek, CA Relationship Banker September 2020 - January 2022 ● Advised over 100 customers daily while balancing compliance requirements, service quality, and operational accuracy in a fast-paced environment.
● Explained complex financial policies and procedures clearly to diverse audiences, strengthening trust, informed decision-making, and customer experience.
● Stabilized branch operations during leadership changes by redesigning schedules, clarifying roles, and tracking service metrics to ensure consistent outcomes.
LiKEN Knowledge Santa Barbara, CA Research Assistant January 2020 - August 2020 ● Co-authored a land-use assessment for a $20,000 grant, aligning research with community priorities in Appalachia and partner timelines.
● Interpreted and transcribed interviews with tribal partners, ensuring cultural accuracy, consent, and respectful data management for community-led conservation planning.
LICENSES & CERTIFICATIONS
Project Management Professional (PMP) – Project Management Institute March 2025 Certified Associate in Project Management (CAPM) – Project Management Institute September 2024
EDUCATION
University of California, Santa Barbara Santa Barbara, CA Bachelor of Arts in Environmental Studies June 2020 Universidad de Carlos III de Madrid Madrid, Spain Emphasis on Spanish Culture, Politics, Society August 2019
COMMUNITY & LEADERSHIP
White Pony Express Led food sorting and same-day refrigerated distribution, supporting 98 nonprofit partners 2025 SKILLS
Languages: Intermediate Spanish (spoken and written)
Application
Robert Bagley
Summary
Dedicated maintenance professional with a deep commitment to the safety and functionality of public education facilities. I offer a hands-on background in multi-trade repairs, playground safety compliance, and proactive facility management. My goal is to leverage my operational experience to support the long-term stewardship and accessibility of our community's recreational and public spaces.
Skills Summary
◆ Knowledge of tools and power tools.
◆ Installation of Lightfixtures, bulbs, etc.
◆ Clear communication
◆ Hanging: blinds hinges, frames,
◆ Self-directed and follows
directions
Professional Experience
Berkeley Unified School District April 2023 - Present
Maintenance Technician Berkeley, CA
● Perform skilled maintenance and repair duties across District buildings, facilities, and equipment to ensure a safe environment for students and staff. ● Troubleshoot and repair malfunctions in plumbing systems, including clearing drains and replacing fixtures like sinks and drinking fountains.
● Maintain and repair building hardware such as door frames, locks, hinges, and gates to ensure facility security.
● Playground Safety & Maintenance: Inspect, maintain, and repair playground equipment and surfacing to ensure compliance with safety standards and a secure environment for Student and Public use.
● Perform electrical repairs, including replacing circuits, fuses, switches, ballasts, and lighting fixtures.
● Execute preventative maintenance tasks on HVAC systems, pumps, motors, and fans to maximize equipment longevity.
● Operate and maintain a wide variety of specialized hand and power tools, including drills, gauges, and construction equipment.
● Coordinate with District personnel to prioritize and document work orders, ensuring timely completion of facility repairs.
● Strictly observe health and safety regulations, including fire codes and building ordinances, during all repair activities
Mount Diablo Unified School District Sept 2018 - March 2023 Campus supervisor Walnut Creek, CA
● Supervises students at play and during eating time.
● Observes that safety rules are obeyed and applies school site discipline policy and student conduct code.
● Helps to guide pupils in developing good habits of sportsmanship. ● Communicate effectively with a wide variety of personalities. ● Observe health and safety regulations.
Round Table Pizza August 2017 – June 2018
Robert Bagley
Driver / Manager / Kitchen Crew Pittsburg, CA
● Customer Service, answering phones, taking notes, etc. ● Do what it takes to make the store run smoothly.
● Train, develop and coach others to perform routine job duties to optimize their effectiveness.
● Marketing to the guests with current specials and promotions. ● Achieving stores financial targets.
● Maintaining a safe, clean environment.
● Inventory and daily budgeting.
● Drive to customers as needed, kitchen prepare staff, all positions within the store.
Sarin’s Closet / Traveling Pants July 2014 - Present
Business Manager Concord and Brentwood, CA
◆ Perform all on going minor maintenance for the store. ◆ Framed and built dressing rooms, drywall, and painted. ◆ Repair holes, switched out existing light fixtures, and replacement of bulbs. ◆ Organize and developed business plan and updated policies for organization. ◆ Spearheaded and completed new software initiative for business, to increase efficiency and track performance
Odd Jobs Various June 2010 – August 2015
East Bay Area
◆ Worked with various contractors or sub-contractors or found work on the side. ◆ Did handy man work and small construction jobs.
◆ Painting, Patching, Demolition, Framing, Hanigng, Installing and building.
Student at LMC / DVC June 2012 – August 2014
◆ Returned to Schooling to work on General education to get associates degree Property Manager Public Storage September 2003 – May 2010 Public Storage Martinez, CA
◆ Worked on all maintenance of storage properties, would call in for electrical or plumbing.
Performed all minor fixes.
◆ Prepared all property reports. Managed two assistant property managers.
Education
Los Medanos, Pittsburg
Working towards Associates Degree
References
Available upon request.
Hobby’s and Interests
Actively engaged in youth programs such as Scouts, Sporting programs, and other various community activities.
Application
Please describe any possible personal or professional areas that may present a conflict of interest, or the appearance of conflict of interest, for serving on the board, commission or committee applied for.
While I do not believe any conflict of interest exists, I wish to disclose the following for the sake of transparency. The only real property I own in the city of Concord is the single-family home inhabited by my family from which I do not generate income. Additionally, I have served the following local municipalities as a contractor or employee: • City of Fremont, Landscape Architecture Division – 2012 – 2013 • City of Oakley, Account Manager with private contractor overseeing landscape maintenance contract between the company and City of Oakley – 2013 – 2014 • City of Walnut Creek, Department of Public Works, Parks Division - 2014 • City & County of San Francisco, Recreation & Parks Department – 2014 – 2022 • City & County of San Francisco, Department of Human Resources – 2022 - Date Interests and Experience
Question applies to multiple boards
Describe prior service on a board, commission, or any other community service or public body, indicate agency and explain what significant contributions you made:
I have significant experience providing information to public boards and bodies as well as previous membership on a private board. In my current role as an Equal Employment Opportunity Programs Senior Specialist for the City & County of San Francisco, I regularly represent the position of the City’s Human Resources Director in front of the city’s Civil Service Commission in public meetings on matters related to equal employment and reasonable accommodation complaints and appeals. I previously served as a Director on the Floresta Gardens Homeowners Association Board of Directors in San Leandro, California between 2019 and 2022. In that role, I provided guidance and recommendations to my fellow board members on large capital projects including the repaving of private roadways and the replacement of roadway lighting. I also advised my fellow board members and voted on the contracts awarded to both short and long-term service providers and vendors.
Additionally, I routinely provided professional knowledge and guidance related to infrastructure maintenance and troubleshooting particularly in the areas of landscape maintenance and tree care as well as water-related infrastructure including backflow prevention devices, communally owned water service lines, and irrigation. Working as an intern for the City of Fremont during my senior year of college, I authored the city’s Tree Policy Guidelines Manual, a roughly 100-page document educating city contractors, employees, and residents about tree care and relevant municipal ordinances. While pursuing my undergraduate degree, I served as a pro bono consultant to the County of Los Angeles for the redesign of the county-owned Altadena Community Garden. My work included leading community meetings to obtain public input as well as leading the design and implementation of the property renovation. Following the project’s completion, I was awarded a Commendation by the County of Los Angeles for public service.
Brian Capurro
Staff Report
Date: August 11, 2026
To: City Council
From: Jerome C. Wilverding, City Manager
Prepared by: Joelle Fockler, MMC, City Clerk
[email protected]
Reviewed by: Justin Ezell, Assistant City Manager
Subject: Considering adoption of a Resolution amending Resolution No. 25-47 by deleting a Regular Council Meeting on December 8, 2026, from, and adding a Regular Council Meeting on
December 15, 2026, to the 2026 City Council Meeting Calendar.
Report in Brief
The City Council adopts its regular meeting schedule annually by resolution. Due to scheduling needs, staff identified the need to delete the Regular Council Meeting on December 8, 2026, and add a Regular Council Meeting on December 15, 2026.
Recommended Action
Adopt a Resolution amending Resolution No. 25-47 by deleting a Regular Council meeting on December 8, 2026, from, and adding a Regular Council Meeting on December 15, 2026, to the 2026 City Council Meeting Calendar.
Background
On December 2, 2025, the City Council adopted Resolution No. 25-47, which amended Policy and Procedure No. 2 and established both the regular meeting day and the number of Council meetings per month for 2026.
Analysis
The adopted 2026 meeting calendar includes a meeting on December 8, 2026.
Because the City Council meets only once in December and will not meet again until January 13, 2026, it is better to hold a meeting on December 15 to even out the time
4.c
City Council Agenda Report
Agenda Item No. 4.c
August 11, 2026
between City Council meetings and allow staff to plan accordingly and minimize potential scheduling conflicts.
Public Contact
The City Council Agenda was posted.
Attachment
1. Resolution Amending Resolution No. 25-47 with Exhibit A, 2026 City Council Meeting Calendar
Res. No. 26-XX 1
BEFORE THE CITY COUNCIL OF THE CITY OF CONCORD
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA
A Resolution Amending Resolution No. 25-47 by
Deleting a Regular Council Meeting on December 8,
2026, from and Adding a Regular Council Meeting on
December 15, 2026, to the 2026 City Council Meeting
Calendar
Resolution No. 26-XX
/
WHEREAS, Government Code Section 54954 requires the City Council, by ordinance or resolution, to set forth the time and place for holding regular meetings and Section 2.05.010 of the Concord Municipal Code requires the Council, by resolution, to set forth the day of the week, the number of meetings per month, and the time the regular meetings will convene; and WHEREAS, on December 2, 2025, the City Council adopted Resolution No 25-47 amending Policy and Procedure No. 2 and establishing the day of the week and the number of meetings per month that Council will convene as set forth in the 2026 City Council Meeting Calendar; and WHEREAS, the City Council desires to delete a regular meeting on December 8, 2026, from, add a regular meeting on December 15, 2026, to the 2026 City Council Meeting Calendar.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CONCORD DOES RESOLVE AS FOLLOWS:
Section 1. The City Council hereby amends the 2026 City Council Meeting Calendar to delete a regular meeting on December 8, 2026, and include a regular meeting on December 15, 2026, attached as Exhibit A.
Section 2. This resolution shall become effective immediately upon its passage and adoption. //
//
//
//
//
Attachment 1
Res. No. 26-XX 2
PASSED AND ADOPTED by the City Council of the City of Concord on August 11, 2026, by the following vote:
AYES: Councilmembers -
NOES: Councilmembers -
ABSTAIN: Councilmembers -
ABSENT: Councilmembers -
I HEREBY CERTIFY that the foregoing Resolution No. 26-XX was duly and regularly adopted at a regular meeting of the City Council of the City of Concord on August 11, 2026.
Joelle Fockler, MMC
City Clerk
APPROVED AS TO FORM:
Susanne Meyer Brown
City Attorney
Attachment: Exhibit A – Amended 2026 City Council Meeting Calendar
PROPOSED CALENDAR – 2ND AND 4TH TUESDAYS 2026
The Concord City Council regularly meets the second, and fourth Tuesday each month.
Below are the dates for the second and fourth expected regular meetings and one meeting in December 2026. The Mayor, working with the City Manager, may cancel meetings or call special meetings to support the work of the Council. All meetings are publicly noticed in accordance with State law and Council policy. To the extent meeting indicated below as “cancelled” are reinstated, such reinstated meetings shall constitute regular meetings of the Concord City Council.
Because meeting dates can change, interested parties should always check the City’s website at www.cityofconcord.org or call the City Clerk’s office at (925) 671-3495 if they are interested in attending a meeting.
January 13 July 14 (Cancelled due to Council recess)
January 27 July 28
February 10 August 11
February 24 August 25
March 10 September 8
March 24 September 22
April 14 October 13
April 28 October 27
May 12 November 10
May 26 November 24 (Cancelled due to Thanksgiving)
June 9 December 15
June 23 December 22 (Cancelled due to City Holiday)
Exhibit A to Attachment 1
Staff Report
Date: August 11, 2026
To: City Council
From: Mindy Gentry, Director of Community Development
Reviewed by: Carlton Thompson, PE, City Engineer
Bruce Davis, PE, CIP Manager
Prepared by: Tianjun Cao, PE, Associate Civil Engineer
[email protected]
(925) 671-3243
Subject: Considering the following actions for Sewer Maintenance Project No. 1 (Project No. 2733), which will upgrade sewer lines at six locations in Concord and one location in the City of Clayton:
1. Award of a construction contract in the amount of
$2,178,433.75 to Ranger Pipelines Incorporated and
authorizing up to a 10% contingency for contract change orders; authorizing the Mayor to execute the contract in a form acceptable to City Attorney (Funded by Sewer Enterprise Funds);
2. Approval of Task Order #4 with Ghirardelli Associates Inc. in the not-to-exceed amount of $335,475.56 to provide
construction management, inspection, and materials testing services and authorizing the City Manager to execute the task order, in a form acceptable to the City Attorney (Funded by Sewer Enterprise Funds);
3. Approving related Sewer Enterprise budget transfers in the total amount of $1,200,000 from Downtown Sanitary Sewer Upgrade – Phase 4 (Project No. 2598); and
4. Authorizing the City Engineer to accept the improvements upon completion of Project No. 2733 and directing the City Clerk to file a Notice of Completion.
4.d
City Council Agenda Report
Agenda Item No. 4.d
August 11, 2026
CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15273, 15378, 15301, 15302, 15304 and/or Public Resources Code 21065.
Report in Brief
Sewer Maintenance Project No. 1 (Project No. 2733) will repair existing sanitary sewer lines using various methods at seven locations within Concord and the City of Clayton.
The locations for this project include the Iron Horse Trail by Solano Way and Stanwell Drive, Matheson Road, Armand Drive, Bon Homme Way, Montgomery Avenue, San Simeon Drive near Saint Joseph Drive, and Regency Drive in the City of Clayton (Attachment 1).
A Task Order with Ghirardelli Associates Inc. is required to assist with construction management, inspection, and materials testing during construction of the project. The project has been designed and competitively bid; and is at the point of construction contract award. If award is approved by City Council, project construction is anticipated to begin in September 2026 and be completed in February 2027, weather permitting.
Recommended Action
1. Award of a construction contract in the amount of $2,178,433.75 to Ranger Pipelines Incorporated for the Sewer Maintenance Project No. 1 (Project No. 2733) and authorizing up to a 10% contingency for contract change orders; authorizing the Mayor to execute the contract in a form acceptable to City Attorney (Funded by Sewer Enterprise Funds);
2. Approve Task Order #4 with Ghirardelli Associates Inc. in the not-to-exceed amount of $335,475.56 to provide construction management, inspection, and materials testing services and authorizing the City Manager to execute the task order, in a form acceptable to the City Attorney (Funded by Sewer Enterprise Funds);
3. Approve Sewer Enterprise related budget transfers in the total amount of $1,200,000 from Downtown Sanitary Sewer Upgrade – Phase 4 (Project No. 2598);
4. Authorize the City Engineer to accept the improvements upon completion of Project No. 2733 and directing the City Clerk to file a Notice of Completion; and
5. Make the CEQA determinations as provided in this staff report.
Background
On June 25, 2024, Council approved the Two-Year Capital Budget and Five-Year CIP for Fiscal Years (FY) 2025-2029, which included funding for Sewer Maintenance Project No. 1 (Project No. 2733). This is one of four sewer maintenance projects that were included in the Capital Budget. This project was generated based upon
City Council Agenda Report
Agenda Item No. 4.d
August 11, 2026
recommendations from the Sewer Master Plan that was adopted in March 2023, with this project consisting of the highest priority.
The project scope includes sewer rehabilitation and repair methods such as open trench pipe replacement, pipe bursting, and Cured in Place Pipe (CIPP). Specific project locations include the following streets or areas:
• Matheson Road between Clayton Road and Geneva Avenue
• Armand Drive between Glazier Drive and Thornwood Drive • Bon Homme Way
• Montgomery Avenue between Dormer Avenue and Wexford Drive • Iron Horse Trail by Stanwell Drive and work adjacent to Solano Way within private property easements located in 1850, 1854, 1860, and 1890 Solano Way • San Simeon Drive at 2800 Saint Joseph Drive
• Regency Drive in the City of Clayton
Armand Drive received a surface treatment in May 2025 that came with a paving moratorium of five years. At the time of the paving project, the scope of the future sewer project had not yet been fully defined, and due to spending deadlines, the pavement surfacing project could not be delayed. Due to the surface treatment, the sewer work on this street was kept as an additive bid in order to provide the City with the option of awarding or not awarding this work at this time. After careful consideration, staff is recommending awarding the work on Armand Drive despite the pavement moratorium for several reasons:
1) The closed-circuit television (CCTV) taken of the main line during project design showed much larger deficiencies than that was identified in the Sewer Master Plan. Based upon feedback from Public Works sewer maintenance staff, Engineering determined that the line is vulnerable to major backups in its current condition and should be repaired within the next two years. Armand Drive is located within maintenance Zone 2 and won’t be scheduled for another sewer project until 2032, well beyond the identified two-year time span for repairs. 2) The scope of work for pavement restoration for Armand Drive would be trench restoration and a surface treatment to match the recently completed resurfacing.
The resulting asphalt section along the sewer line trench will be newer and be slightly thicker, resulting in a better roadway condition than the current condition.
City Council Agenda Report
Agenda Item No. 4.d
August 11, 2026
3) The contractor’s bid total for the surface treatment is less than 3% of the total additive bid cost, meaning that the City would be repairing a critical deficiency in the sewer line with only a minor increase in funding required to restore the road.
Analysis/Procurement Process
The project was advertised for construction bids as required by state law and City policy. The Engineer’s Estimate for the Total Bid is $2,776,600. Bids were opened on July 2, 2026. Four (4) bids were received in the amount ranging from $2,178,433.75 to $3,015,789.25. The basis of award for this project is the Total Bid. The lowest bid was received from Ranger Pipelines Incorporated of San Francisco, CA (Ranger). A summary of the three lowest responsive bids is as follows:
BID
SCHEDULE
Engineer's
Estimate
Ranger
Pipelines
Incorporated
KJ Woods
Construction
Inc.
Kerex
Engineering
Base Bid $1,670,600 $1,463,233.00 $1,818,000.00 $1,976,740.50 Additive
Bid #1 $1,106,000 $715,200.75 $670,000.00 $1,018,259.90 Total Bid $2,776,600 $2,178,433.75 $2,488,000.00 $2,995,000.40 Ranger was the low bidder and submitted a responsive and responsible bid. Ranger has an appropriate and valid contractor’s license and satisfactory work references.
Staff completed an analysis of Ranger’s bid, determining that this firm along with its subcontractors possess appropriate and valid licenses, and are not on any debarred lists. Ranger is registered with the Department of Industrial Relations as required by Senate Bill 854. Staff is recommending award of the Total Bid. Ranger and their subcontractors have agreed to be bound to the Citywide Project Stabilization Agreement. Should Council award this contract, sewer improvements at seven locations would be constructed.
On May 26, 2026, in conformance with the City’s purchasing policies, staff contacted and issued an informal Request for Proposal (RFP) from Ghirardelli Associates Inc. (Ghirardelli), under the Master Service Agreement (MSA) for Construction Management, Inspection, and Materials Testing Services to provide services for the Sewer Maintenance Project No. 1. The proposal was received and reviewed by Staff.
City Council Agenda Report
Agenda Item No. 4.d
August 11, 2026
City Staff and Ghirardelli negotiated the scope of work and cost for the services and agreed upon $335,475.56 as fair and reasonable compensation for design and related services for the project. Ghirardelli and their materials testing subconsultant, Inspection Services Inc., have both agreed to be bound to the Citywide Project Stabilization Agreement for materials testing services. As the Task Order is over $200,000, Council approval is required.
Financial Impact
The current total budget for the project is $2,000,000, funded by Sewer Enterprise Funds (Fund 710). This amount is insufficient funds to cover the full cost of construction, and a budget transfer is required to fully fund the work.
Staff recommends transferring $1,200,000 from the Downtown Sanitary Sewer Upgrade – Phase 4 (Project No. 2598) (Fund 710). Project No. 2598 is currently in project closeout and the remaining funds are no longer needed. Following this transfer, the revised project budget will total $3,200,000.
Environmental Determination
Pursuant to the California Environmental Quality Act (CEQA) of 1970, Public Resources Code Section 21000, et. seq., as amended and implementing State CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations (collectively “CEQA”), the award of the contract, a budget transfer, and approval of Task Order do not constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Regs. Sections 15060(c), 15273, 15378, as it has no potential for resulting in a direct or reasonably foreseeable indirect physical change in the environment and/or the activities consist of creation of government funding mechanisms or other government fiscal activities which do not constitute a “project”. Even if Council action on this item did constitute a project under CEQA, it falls within the “common sense” exemption set forth in 14 Cal. Code Regs. Section 15061(b)(3), excluding projects where “it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.”
In the alternative, award of this contract is exempt under CEQA Guidelines Sections 15301 – Existing Facilities, 15302 – Replacement and Reconstruction, and 15304 – Minor Alterations to Land, as it involves constructing sewer improvements where there is existing roadways and pavement restoration. No unusual circumstances exist and none of the exceptions under CEQA Guidelines Section 15300.2 applies. This determination reflects the City’s independent judgement and analysis. The Notice of Exemption will be filed with the County Clerk’s office following the Council award of the construction contract.
Public Contact
The City Council Agenda was posted.
City Council Agenda Report
Agenda Item No. 4.d
August 11, 2026
Attachments
1. Project Location Map
2. Bid Summary
3. PJ2733 Construction Contract
4. Task Order #4 (Ghirardelli Associates)
Exhibit A (Proposal) to Task Order #4
Attachment 1
Legend:
Project Locations
Attachment 1
Project Location Map
Sewer Maintenance Project No. 1
City Project No. 2733
Contact: Tianjun ext. 3243
City of Concord
Bid Sheet
PROJECT #2733 Bid Opening:
Sewer Maintenance Thursday,
July 2, 2026
2:00 p.m.
Garden Conference Room
Engineer’s Estimate: To be awarded:
COMPANY TOTAL BID
Ranger Pipelines, Inc.
P.O. Box 24109
San Francisco, CA 94116
DIR: 1000003604
$2,178,433.75
KJ Woods Construction, Inc.
P.O. Box 947
South San Francisco, CA 94083
DIR: 1000002599
$2,488,000.00
Kerex Engineering
P.O. Box 23831
Pleasant Hill, CA 94523
DIR: 1000033698
$2,995,000.40
Cratus, Inc
945 Taraval Street
San Francisco, CA 94116
DIR: 1000007809
$3,015,789.25
Attachment 2
CONTRACT
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
This public works contract (“Contract”) is entered into by and between the City of Concord (“City”) and Ranger Pipelines Incorporated (“Contractor”), for work on the Sewer Maintenance Project No. 1 (City Project No. 2733) (“Project”).
The parties agree as follows:
1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a bid to perform the Work to construct the Project. On August 11, 2026, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below.
2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of all of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, including this Contract.
2.1 Notice Inviting Bids;
2.2 Instructions to Bidders;
2.3 Addenda, if any;
2.4 Bid Form and attachments thereto;
2.5 Contract;
2.6 Payment and Performance Bonds;
2.7 General Conditions;
2.8 Special Conditions;
2.9 Project Plans and Specifications;
2.10 Change Orders, if any;
2.11 Notice of Potential Award;
2.12 Notice to Proceed
3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance
2 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 standards required by the Contract Documents.
4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor $2,178,433.75 (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.
5. Time for Completion. The Project must be fully completed within 64 working days for Base Bid and within 30 working days for Additive Bid (weekends and holidays are excluded) from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin in September 2026 but the anticipated start date is provided solely for convenience and is neither certain nor binding.
The Contractor will fully complete the Work for the Project, meeting all requirements for completion of all bid items within 94 working days from the commencement date given in the Notice to Proceed (“Contract Time”). By signing below, Contractor expressly waives any claim for delayed early completion.
6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions and below, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amounts described below, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract. 1) Contractor shall pay to the City of Concord $2,272 per day for each and every calendar day(s) delay in completing the work in excess of the number of working days specified.
2) The Contractor shall pay to the City of Concord $431 per hour for each hour that the Contractor performs work outside the hours of work without prior approval in writing from the City.
3) The Contractor shall pay to the City of Concord $1,000 per day for each day that the Contractor:
a. Fails to maintain all temporary signage/traffic delineation until final striping is completed.
3 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 b. Repeated failure to meet the sweeping schedule
c. Failure to provide sufficient flaggers, detour signage, or supervision.
7. Labor Code Compliance.
7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.
7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.
7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”
9. Conflicts of Interest. Contractor, its employees, Subcontractors and agents, may not have, maintain or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations.
Any violation of this Section constitutes a material breach of the Contract.
10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City.
4 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery.
Notice for each party must be given as follows:
City:
Sewer Maintenance Project No. 1
1950 Parkside Drive M/S 40
Concord, CA 94519
Attn: Tianjun Cao, Associate Civil Engineer
[email protected]
Contractor:
Name: Ranger Pipelines Incorporated
Address: 1790 Yosemite Avenue
City/State/Zip: San Francisco, CA 94124
Phone: (415) 822-3700
Attn: Thomas Grover
Email: [email protected]
12. General Provisions.
12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns.
12.2 Third Party Beneficiaries. There are no intended third party beneficiaries to this Contract.
12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Contra Costa County Superior Court, and no other place. Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or
5 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 relating to this Contract to a venue outside of Contra Costa County, California.
12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.
12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor.
12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.
12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporation Code § 313.
The parties agree to this Contract as witnessed by the signatures below:
CITY: Approved as to form:
_______________________________ __________________________________ Laura M. Nakamura, Mayor Susanne Brown, City Attorney
Date: ___________________________ Date: ______________________________
6 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 Attest:
_______________________________
Joelle Fockler, City Clerk
Date: ___________________________
CONTRACTOR: Ranger Pipelines Incorporated
_______________________________
Thomas Grover, VP - Estimating
Date: ____________________________
414996, 2/29/2028 .
Contractor’s California License Number(s) and Expiration Date(s) FINANCE DIRECTOR'S CERTIFICATION:
Concord, California
Date:
I HEREBY CERTIFY THAT ADEQUATE FUNDS EXIST OR WILL BE RECEIVED DURING THE CURRENT FISCAL YEAR 25/26 TO PAY THE ANTICIPATED EXPENSES TO BE INCURRED PURSUANT TO THIS CONTRACT.
THE SUM OF $2,178,433.75. Account Code 7109500C999-74200 / 7102733115-74200 Finance Director's Signature
1 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 TASK ORDER
TASK ORDER NO: 4
PROJECT NAME: Sewer Maintenance Project No. 1, PJ 2733
RELATED TO MASTER AGREEMENT WITH: Ghirardelli Associates, Inc., 6777 This Task Order is made and entered into this August 11, 2026, the City of Concord, hereinafter referred to as CITY, and Ghirardelli Associates, Inc., hereinafter referred to as CONSULTANT.
Whereas, the parties hereto entered into a Master Agreement dated July 1, 2024 for a not-to-exceed total amount of $1,000,000.00 per fiscal year from the effective date of July 1, 2024 through June 30, 2027, to provide professional services as needed for various capital improvement projects; and Whereas, CITY desires CONSULTANT to perform certain tasks as hereinafter described for: Sewer Maintenance Project No. 1, PJ 2733.
Now, therefore, in consideration of the mutual promises, covenants, and conditions set forth herein, the parties agree as follows:
SECTION 1 - SCOPE OF SERVICES
CONSULTANT will provide Construction Management Services for Sewer Maintenance Project No. 1, PJ 2733 per Exhibit A, a proposal from Ghirardelli Associates, Inc., dated June 12, 2026, attached hereto and made a part hereof.
SECTION 2 – STAFFING AND ORGANIZATION
CONSULTANT will provide staff technically appropriate for this project.
SECTION 3 - COMPENSATION
CONSULTANT shall be compensated on a time-and-materials basis for construction management, inspection, and materials testing services not to exceed $335,475.56 as rendered under Section 1 of this Agreement. Compensation shall be in accordance with the terms and conditions indicated therein.
CONSULTANT may submit monthly statements for basic and additional services rendered. It is intended that payments to CONSULTANT will be made by CITY within thirty (30) days of receipt of invoice.
2 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 SECTION 4 – TASK ORDER SUMMARY
In Witness whereof, the parties have executed this Task Order No. 4 the day and year written above.
CONSULTANT CITY OF CONCORD
By: ____________________________________ By: ____________________________________ Name: Randall Bruner
Title: President
Email: [email protected]
Name: Carlton Thompson
Title: City Engineer
APPROVED AS TO FORM:
____________________________
ATTEST:
_______________________________________
City Attorney City Clerk
Task
Order
No.
Date
Approv
ed
Purcha
se
Order
No.
$ Amount
Fiscal Year
24/25
$ Amount
Fiscal Year
25/26
$ Amount
Fiscal Year
26/27
Account Code
1 4/1/25 20809 $22,400.24 262-9500-C999-74250
262-2552-117-74250
2 9/22/25 21663 $298,267.43 407-9500-C999-74250
407-2452-117-74250
3 5/15/26 TBD $10,000.00 100-6200-1Z01-63800-400
4 7/9/26 TBD $335,475.56 710-9500-C999-74250
710-2733-117-74250
Grand total, all task orders
including this task order #4
$22,400.24 $308,267.43 $335,475.56
Master Agreement dated
7/1/2024, term through
6/30/27.
$1,000,000.00
per fiscal year
3 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 FINANCE DIRECTOR'S CERTIFICATION:
Concord, California
Date: _______________________, 2026
I HEREBY CERTIFY THAT ADEQUATE FUNDS EXIST OR WILL BE RECEIVED DURING THE CURRENT FISCAL YEAR 26/27 TO PAY ANTICIPATED EXPENSES TO BE INCURRED PURSUANT TO THIS CONTRACT TO THE SUM OF UP TO $335,475.56.
ACCOUNT CODE:
710-9500-C999-74250
710-2733-117-74250
_________________________________
FINANCE DIRECTOR'S SIGNATURE
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 1 File No. 23241.003
June 12, 2026
Tianjun Cao, PE
Associate Civil Engineer
City of Concord
Engineering Services
1950 Parkside Drive, M/S 40
Concord, CA 94519
Via Email: [email protected]
RE: PJ 2733 – Sewer Maintenance Project No. 1 – Construction Management, Inspection, and Materials Testing
Dear Mr. Cao,
Ghirardelli Associates, Inc. (Ghirardelli) is pleased to submit this letter proposal to assist the City of Concord (City) with construction management, inspection, and materials testing services for the Sewer Maintenance Project No. 1.
UNDERSTANDING
The City of Concord Sewer Maintenance Project No. 1 (Project No. 2733) is a comprehensive infrastructure rehabilitation program aimed at improving the reliability and performance of the City’s sanitary sewer system across multiple corridors, including Montgomery Avenue, Solano Way, Iron Horse Trail, Matheson Road, Armand Drive, Bon Homme Way, Regency Drive, and San Simeon Drive. The project involves a combination of trenchless and open-cut construction methods, including pipe bursting, cured-in-place pipe (CIPP) lining, point repairs, and localized open trench replacement to address deteriorated vitrified clay pipelines and structural deficiencies. Work also includes rehabilitation and replacement of manholes and cleanouts, reconnection and restoration of sewer laterals, and maintenance of continuous sewer service via bypass systems during construction. Supporting activities include potholing and protection of existing utilities, CCTV inspection before and after construction, traffic control, stormwater pollution management, and full surface restoration such as pavement, curb, sidewalk, striping, and trail improvements. The project is designed to enhance system capacity, reduce infiltration and inflow, and extend the service life of critical sewer infrastructure while minimizing disruption to the public through coordinated construction practices and stakeholder communication.
STAFFING
Ghirardelli will provide a Resident Engineer, Inspectors, and materials testing services on the project.
Our Resident Engineer, Natasha Ikponmwonba, PE, PMP, has over 15 years of experience delivering public infrastructure projects, including extensive work with underground utilities, trenching, and pavement restoration in active roadways. She excels in construction management, contract compliance, and coordination with agencies and stakeholders to ensure high-quality, compliant project delivery.
Exhibit A to attachment 4
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 2 Supporting her is Construction Inspector, Bridget Supple, who brings over 25 years of experience inspecting public works projects, including installation of sewer, water, storm drain, and joint trench utilities, along with associated paving and site improvements. She provides thorough field oversight, including contractor compliance, SWPPP inspections, quantity tracking, and documentation, supported by strong expertise in environmental regulations and utility coordination.
Ghirardelli has included CAL Pavement Management (CPM) to perform inspection services for the Asphalt Rubber Cape Seal Treatment areas and Inspection Services, Inc. (ISI) to perform materials testing services.
Together, this team will ensure that City needs are met and ensure a quality project is delivered.
Ghirardelli understands that services will begin September 2026 for a period of 64 working days(base bid) or 94 working days (with additive bid) and are fully prepared to begin work immediately upon notice to proceed.
SCOPE OF WORK
Ghirardelli is proposing the following scope of services for the project. The scope of work is divided into three phases: pre-construction, construction, and post- construction.
Pre-Construction Services
Natasha will organize a pre-construction conference with the Contractor, subcontractors, City staff, Designer (Freyer & Laureta, Inc.), construction management (CM) team members, and other interested parties to discuss the project and the work involved. This conference will provide a forum for answering questions from the Contractor and other interested parties as well as addressing issues and coordination that need to be performed before work commences. Ghirardelli’s Resident Engineer will prepare an agenda and meeting minutes.
Construction Services
Natasha will manage the day-to-day administration of the project. She, as appropriate, will be the first point of contact with the Contractor, representing the City and the CM team. Natasha will:
• Prepare letters to the Contractor giving formal direction and instruction, when necessary. • Coordinate with the City, providing informational updates and requesting input, as needed. • Manage and perform project inspection.
• Enforce the CSPP and monitor compliance.
• Document progress and operations with daily photographs. • Coordinate, manage and review materials sampling and testing activities. • Monitor project safety and verify compliance with laws, orders, and regulations. • Review labor compliance documents.
• Prepare punch lists and verify satisfactory completion.
Contract Administration
Natasha will review and respond to submittals and RFIs in coordination with the City’s Project Manager; review and monitor the Contractor’s schedule; coordinate the review of traffic control plans and inspection of traffic control measures; review the Contractor’s compliance with all permits, stormwater
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 3 regulations and permits (SWPPP), and environmental documents; review the Contractor’s compliance with health and safety standards and regulations and reporting of non-compliance; and monitor record documents to ensure proper maintenance and completion by the Contractor. At the conclusion of each week's work, a Weekly Statement of Working Days (WSWD) will be submitted to both the Contractor and City staff.
Project Coordination/Meetings
Natasha will hold weekly meetings with the Contractor, City staff and other interested parties. She will prepare and distribute the weekly project meeting agenda and minutes to attendees. Natasha will be in close communication with the City Project Manager to coordinate project issues and keep the City informed regarding the project status. Natasha will also coordinate with utility agencies and other third parties and arrange meetings for specific issues, as needed.
Scheduling
Natasha will review the Contractor's baseline schedule and determine its conformance with the plans and specifications. She will also review the schedule and look ahead schedules to verify that the project is on schedule. Any slippage will be discussed with the Contractor and the City Project Manager so that action can be taken to minimize delays to project completion.
Progress Payments
Natasha will prepare progress payment estimates and will include the quantity and amount to pay, quantity and amount paid to date, and the quantity and amount remaining for each contract item and change order. She will submit with each progress estimate, source documents justifying the quantities to be paid.
Natasha and Bridget will prepare source documents for payment for work performed for each item listed in the Engineer’s Estimate. These source documents will include calculations, field measurements and counts to document the exact quantity(s) of item work performed each progress pay period. These source documents will be filed in the project records and will be the basis for payment as well as the auditable permanent project records.
Submittals and RFIs
Natasha will review Submittals and RFIs and coordinate with the City Project Manager and the Designer (Freyer & Laureta, Inc.) to respond in a timely manner. By Ghirardelli’s close monitoring of and coordinating the response to Submittals and RFls, we will help to prevent potential project delays and impacts. Document logs will be maintained for correspondence, submittals/shop drawings, RFls, RFCs, change orders and disputes and potential claims.
Construction Inspection
Close adherence to the plans, details, and all applicable specifications is required to properly construct and administer the project. Inspection activities include, but are not limited to, maintaining continuous City coordination, issuing notices of non-compliance, maintaining strict adherence to all local policies, conducting a daily review of the construction operations, and adhering to all applicable contract specifications and standards to include City, State and Federal.
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 4 Bridget will prepare a daily report for each construction day. Bridget’s daily reports (including the reports from material testers) will be provided to Natasha. The daily reports will include the following information:
• Date, project identification, contractor’s name, subcontractor’s name(s), and time of inspections.
• Conditions (weather, moisture, soil, etc.); any inclement weather conditions that hampered or delayed the contractor’s operations.
• Activities detail. Scheduled activities including starting and completion dates. Bid item numbers of all activities should be listed in the daily report. • Difficulties encountered by the contractor.
• Construction issues (disputes, questions in the field, etc.). • Deficiencies and violations (including construction work, safety, labor, etc.). • Major material and equipment deliveries to the site (type, quantity, means of delivery, and condition of materials).
• Record of manpower, construction equipment, and materials testing locations and results.
Asphalt Rubber Cape Seal Inspections
Per the City’s request, Ghirardelli has included CAL Pavement Management (CPM) to perform inspection services for the Asphalt Rubber Cape Seal Treatment areas. Inspections will include:
• Observation of asphalt rubber binder application operation. • Observations of aggregate spreading, rolling, and sweeping activities. • Verification of material temperatures, application rates, and equipment operations. • Monitoring of workmanship and conformance with project specifications. • Documentation of field conditions, production activities, and observed deficiencies. • Preparation of daily inspection reports and photo documentation. • Punch list preparation and follow-up observations.
Change Orders
Natasha will prepare Change Orders, as necessary, in accordance with the Caltrans Construction Manual, Caltrans Local Assistance Procedures Manual and the City’s Project Manager’s instructions. Change Order approval or Authority to Proceed will be secured from the City before any work of the change is performed.
Materials Sampling and Testing (Field and Lab)
Bridget will coordinate all materials testing with Inspection Services, Inc. (ISI). All materials testing (field and laboratory) will be performed at the frequency established by the contract documents including the City’s Quality Assurance Plan (QAP). Bridget will review the test reports for compliance and maintain the required documentation, including a non-conformance log to ensure that all failed tests are retested until meeting compliance.
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 5 Post Construction Services
Natasha and Bridget will work closely with the Designer (Freyer & Laureta, Inc.), City staff and other stakeholders to help to ensure that the project closeout proceedings are performed quickly, accurately and consistently, in accordance with all pertinent policies and procedures. They will review and monitor the Contractor's submittal information respective to the closeout, such as "as-built" information, punch list preparation, final progress payment, warranties, guarantees, etc. Bridget will perform a final inspection and ensure all items from the punch list are completed.
Under the direction of the Natasha, Bridget will provide City staff with an original set of construction documents, cataloged in accordance with the Caltrans Local Assistance Procedures Manual, which includes all documented correspondence, diaries, reports, photos, correspondence, contract documents, labor compliance, materials, material tests, change orders, progress payment and survey records, etc. for storage by the City. All documents will be digitized and filed electronically.
FEE PROPOSAL
Ghirardelli has provided the hourly rates and fee estimates below.
Hourly Rates
PW BILL RATE
First Shift
Name Role ST OT DT
Natasha Ikponmwonba, PE Resident Engineer $235.62 $235.62 $235.62 Bridgette Supple, CPESC Inspector $212.03 $251.78 $293.28 Mike Williams Inspector (10 days) $209.84 $242.68 $282.68 Fee Summary
Bid Estimated Fee
Base Bid (64 Working Days) $253,382.56
Bid Additive (30 Working Days) $ 82,093.00
Total Base Bid + Bid Additive $335,475.56
Estimated Fee (Base Bid – 64 working days)
PRE-CONSTRUCTION
Resident Engineer 16 hours x $235.62/hour = $ 3,769.92
Inspector 8 hours x $212.03/hour = $ 1,696.24
Estimated Pre-Construction Fee $ 5,466.16
CONSTRUCTION
Resident Engineer 192 hours x $235.62/hour = $ 45,239.04 Inspector 512 hours x $212.03/hour = $108,559.36
Inspector (10 days) 80 hours x $209.84/hour = $ 16,787.20 Inspector (CAL Pav.) 40 hours x $250.00/hour = $ 10,000.00 Materials Testing (ISI) $ 40,000.00
Estimated Construction Fee $220,585.60
Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) ghirardelliassoc.com 6
POST CONSTRUCTION
Resident Engineer 80 hours x $235.62/hour = $ 18,849.60 Inspector 40 hours x $212.03/hour = $ 8,481.20
Estimated Post Construction Fee $ 27,330.80
Total Fee Estimate (Base Bid) $253,382.56
Estimated Fee (Bid Additive – 30 working days)
CONSTRUCTION
Resident Engineer 90 hours x $235.62/hour = $21,205.80
Inspector 240 hours x $212.03/hour = $50,887.20
Materials Testing (ISI) $10,000.00
Total Estimated Fee (Bid Additive) $82,093.00
Rate/Fee Assumptions
1. Resident Engineer work estimated at 3 hours per day during construction.
2. Inspector work estimated at full time at Prevailing Wage First Shift/Standard rate during construction.
CLOSING
As a principal of the firm, I have the authority to bind the firm. Our Project Manager, Ms. Janet Navarro, may be contacted directly if you have any questions. Janet can be reached via phone at 510.414.1588 or email at [email protected].
Sincerely,
Ghirardelli Associates, Inc.
Raewyn Lelo-Butcher
Executive Vice President
M| 510.708.7442
E| [email protected]
Attachments:
Resumes, Rubberized Cape Seal Inspection Fee Estimate, and Materials Testing Fee Estimate.
Page | 1
Natasha Ikponmwonba, PE, PMP
Resident Engineer
Natasha Ikponmwonba, PE, PMP is a licensed Professional Engineer and Project Management Professional with over 15 years of experience managing public-sector capital improvement projects for cities, counties, and federal agencies. She has a proven record leading infrastructure and transportation projects involving street pavement rehabilitation, ADA-compliant roadway improvements, utility installation and coordination, and underground infrastructure work from planning through construction and closeout. Natasha excels in the full range of construction management and resident engineering duties—enforcing contract compliance, overseeing trenching and excavation, managing traffic control, coordinating with utility agencies, and maintaining rigorous documentation in compliance with Caltrans, LAPM, and local agency standards. Her structural engineering background strengthens her technical oversight on projects requiring pavement design, utility trenching, curb and gutter reconstruction, and subsurface work.
Project Experience
San Francisco CDBG Curb Ramps and Paths Project
City of South San Francisco; South San Francisco, CA
Resident Engineer / Construction Manager | Led construction administration and field oversight for the replacement and retrofit of 60+ ADA-compliant curb ramps along with new sidewalks, curbs and gutters, pavement reconstruction, and a retaining wall within active public roadways. Served as Resident Engineer responsible for enforcing contract compliance, coordinating with City staff, contractors, utility agencies, and stakeholders, and resolving field issues involving pavement subgrade, drainage, and street restoration. Managed Caltrans-compliant documentation including daily reports, inspection records, RFIs, submittals, change orders, and progress payments in accordance with LAPM and Caltrans standards.
Oversaw traffic control plans, construction staging, and pavement quality assurance to ensure adherence to project schedule, budget, and specifications.
Fiber Optic Project
City of South San Francisco; South San Francisco, CA
Resident Engineer / Construction Manager | Provided construction management and field oversight for underground conduit and fiber optic installation along Westborough Blvd in an active public roadway. Served as Resident Engineer responsible for contract administration, coordination with City staff, utility agencies, and contractor, and resolution of field conflicts affecting existing underground utilities and pavement structure. Oversaw traffic control, open-cut trenching, conduit placement, pull box installation, trench backfill compaction, and pavement restoration to match existing roadway section. Managed project documentation including daily reports, RFIs, submittals, change orders, and progress payments in accordance with Caltrans and local agency standards.
Slurry Seal Repair Project
City of El Cerrito; El Cerrito, CA
Construction / Project Manager | Provided construction engineering and inspection services for the 2022–2023 Slurry Seal Project under the City of El Cerrito’s On-Call Construction Management contract, funded by Measure A Street Improvement Fund.
Project included patch paving, crack sealing, slurry seal treatment, and striping on 14 street segments. Managed contractor compliance with plans and specifications, EXPERIENCE: 15 Years
TENURE W/GA: <1 Year
EDUCATION:
B.S., Civil Engineering,
California State Polytechnic
University, Pomona, 2009
M.B.A., University of
Arkansas Grantham, 2019
Project Management
Certificate, Cornell
University, 2020
REGISTRATIONS:
PE, CA No. 84041
PMP No. 3136657
DAWIA Level II, Facilities
Engineering
Page | 2
NATASHA M. IKPONMWONBA, PE, PMP
RESIDENT ENGINEER
verified pavement surface preparation, monitored application rates and curing, coordinated traffic control, and maintained complete project documentation including daily reports, quantity tracking, and progress payments.
Community Center Playground & Pavement Project
City of Lafayette; Lafayette, CA
Assistant Resident Engineer | Managed playground replacement and expansion project at the Lafayette Community Center, including grading and pavement work, light pole replacement, tree removal, and installation of new playground equipment. Oversaw earthwork, subgrade preparation, and paving operations to meet design grades and drainage requirements. Coordinated contractor activities, enforced contract compliance, managed traffic and pedestrian control, and maintained project documentation including daily reports, RFIs, submittals, change orders, and progress payments.
Project Controls and Assurances
City and County of San Francisco, San Francisco Public Works; San Francisco, CA Associate Engineer | Assigned to project controls and assurances for complex public works construction projects.
Performed constructability reviews, reviewed and approved contractor submittals, and audited daily reports for active construction projects. Assisted Construction Managers with preparation and maintenance of project documentation.
Maintained comprehensive documentation tracking non-compliance reports, construction incidents, work stoppage dates, and daily report status. Aided the Resident Engineer with responses to complaints; prepared and verified quality assurance reports, quantity estimates, and progress payments. Also responsible for intern onboarding and training new employees.
Variable Message Sign & UCSF Mission Bay Station
San Francisco Metropolitan Transportation Authority; San Francisco, CA Assistant Engineer | Served as project lead on the Variable Message Sign Project for SFMTA, tracking progress across disciplines and coordinating with city agencies, contractors, and the public. Prepared contract documents including engineering estimates, specifications, and bid item descriptions. Designed and analyzed CIDH pile foundations and steel sign structures. Also completed the design of concrete boarding platform for the UCSF Mission Bay Station Platform Extension, performing structural analysis for concrete structure, steel canopy, and steel windscreens.
Reviewed and approved contractor submittals and responded to RFIs and change order requests throughout the construction phase.
Page | 1
Bridget Supple, CMIT, CPESC, QSD
Construction Inspector
Bridget Supple has more than 25 years of experience working on public works and infrastructure projects, including roles in construction management, quality assurance, contract administration, and environmental compliance. She has worked as an owner’s representative, overseeing contractor installation of underground utilities (water, sewer, storm drain, and joint trench), site preparation, stormwater infiltration facilities, and various dredging projects. She is especially qualified to assist clients with her broad range of skills and experience related to stormwater pollution prevention design, planning, and enforcement. Her experience working for the California Coastal Commission and the State Water Resources Control Board provides her with an understanding of regulatory processes and staff contacts. Bridget is a capable inspector with a strong working knowledge of engineering, construction methods, and construction management.
Project Experience
Wilfred Avenue Improvements Project
City of Rohnert Park; Rohnert Park, CA
Construction Inspector | Inspected contractor’s work on the installation of underground utilities (water, sewer, storm drain, and joint trench), soil preparation with lime mixing, placement of subgrade, paving, streetlights, traffic signals, irrigation, and infiltration bioswales. Tracked change orders, reviewed monthly pay requests, issued memos, and conducted SWPPP inspections to ensure contractor work complied with City of Rohnert Park standards and contract documents.
BART C700 Design-Build Utility Extension
Santa Clara Valley Transportation Authority; San Jose, CA Field Engineer | Worked on the C700 design-build project to extend ten miles of the BART system from Fremont to San Jose. Inspected utilities including joint trench, traffic signals, sewer, storm drain, and water. Inspected third-party utility work (PG&E, San Jose Water Company, etc.) to ensure utility relocation work was coordinated with the contractor’s site work. Inspected rebar, concrete placement, and earthwork for structural walls, invert slabs, and temporary support structures for the train trenches and tunnels. Prepared daily reports and documented construction progress using the project’s construction management software and Aconex.
BART C742 Campus Contract – Berryessa Station Site Improvements Santa Clara Valley Transportation Authority; San Jose, CA Field Engineer | Inspected site improvements for the Berryessa BART Station campus including underground utilities, lime treatment of soil, earthwork, CMU soundwalls, decorative concrete, bike paths, sidewalks, curb and gutter, asphalt paving, and bioretention swales. Tracked punch list work and coordinated closeout inspections and testing for the police station and ancillary building. Prepared daily reports, documented construction progress, and ensured contractor compliance with project plans and specifications. Reviewed monthly pay requests, monitored extra work tickets, and coordinated field issues on site.
EXPERIENCE: 25 Years
TENURE W/GA: <1
EDUCATION:
MS, Environmental
Management, University of
San Francisco
BA, Environmental Studies,
Sonoma State University
CERTIFICATIONS:
CPESC
QSP/QSD
CMIT
Member, American
Institute of Construction
Inspectors
Page | 2
BRIDGET SUPPLE, QSD/P
CONSTRUCTION INSPECTOR
Public Works Infrastructure Downtown Redevelopment
City of Petaluma; Petaluma, CA
Project Representative | Worked as a project representative for the construction of public works infrastructure for a downtown redevelopment project. Prepared daily construction progress reports, conducted SWPPP inspections, attended weekly meetings, processed submittals, and kept records of contractor personnel and equipment on site in order to properly document change orders and requests for extra work. Prepared a Request for Proposals (RFP) for Brownfields assessment work in Petaluma.
Stormwater Pollution Prevention Inspections
Caltrans District 4 (Marin, Sonoma, and Napa Counties), CA Inspector | Conducted stormwater pollution prevention inspections. Prepared inspection reports and compliance documentation and reported back to District headquarters to keep environmental staff informed of activities in various construction field offices. Construction sites inspected included paving, highway widening, retaining walls, emergency slide-out projects, and bridge and overpass construction. Co-presented training modules to instruct and educate Caltrans engineers about stormwater compliance and Caltrans policies for implementing construction site monitoring, Caltrans forms and procedures, and guidance manuals to be used to meet compliance goals.
Various Utility Projects
City of Belvedere; Belvedere, CA
Public Works Inspector | Inspected and oversaw a construction crew working on a project to convert overhead utility lines to underground service. Work involved coordinating service tie-ins with homeowners in the district and educating the residents about their responsibilities and options. Prepared monthly bid quantity summaries for use by the contractor and the engineer for payment purposes. Utilized communication skills in dealing with the unique challenge of working on extremely narrow streets, steep hillsides, and expensive homes with residents with a high level of “not in my backyard” attitude towards construction activity. Maintained As-Built drawings, and assisted the City Engineer in managing this $1 million project.
Dumbarton Quarry Park
East Bay Regional Parks District; Oakland, CA
Owner's Representative | The former quarry property was reclaimed by filling in the site with imported spoils, and the Phase 1 development included turning a portion of the site into a regional park. The park includes RV campsites, an outdoor amphitheater, parking lots with EV chargers, trails, landscaping, and six buildings including shower buildings, a camp store, kiosk, and restrooms. Activities inspected included underground utilities, irrigation, landscaping, paving, grading, storm drain, and construction on the buildings, including coordination of Wi-Fi, fire alarm, security alarm, and communications. Assisted the District in overseeing the activities of the design-build property owner who will turn the site over to the District as part of the quarry reclamation agreement.
Self-Anchored Suspension Project at the San Francisco-Oakland Bay Bridge Caltrans OSC; San Francisco Bay Area, CA
Assistant Resident Engineer and Estimator | Assisted the estimating team by reviewing cost proposals submitted by the contractor for change orders for the California Department of Transportation (Caltrans). Negotiated pricing with contractor’s representatives and verified scope of work included in cost proposals. Processed change order documentation and coordinated document control between the owner, the designer, and the contractor using Project Management Integrated Vision (PMIV) software.
Stormwater Pollution Prevention Inspections
Caltrans District 4 (Marin, Sonoma, and Napa Counties), CA Inspector | Conducted stormwater pollution prevention inspections. Prepared inspection reports and compliance documentation and reported back to District headquarters to keep environmental staff informed of activities in various construction field offices. Construction sites inspected included paving, highway widening, retaining walls, emergency slide-out projects, and bridge and overpass construction. Co-presented training modules to instruct and educate Caltrans engineers about stormwater compliance and Caltrans policies for implementing construction site monitoring, Caltrans forms and procedures, and guidance manuals to be used to meet compliance goals.
Page | 1
Michael Williams
Construction Inspector
Michael Williams is an experienced civil and electrical construction inspector with 18 years of experience on public infrastructure, street pavement, and sewer improvement projects throughout the Bay Area. He has a proven track record inspecting pavement rehabilitation, sanitary sewer upgrades, curb and ramp improvements, storm drain work, and sustainable street projects for cities and counties. Mr. Williams is proficient in construction administration, contract compliance, daily reporting, material testing coordination, traffic control oversight, SWPPP monitoring, and quantity verification for progress payments. He brings strong communication skills, a proactive approach, and deep familiarity with local agency standards, having inspected projects for the Cities of Concord, Richmond, San Rafael, San Mateo, and Pacifica, among others.
Project Experience
Whitman Road Sanitary Sewer Improvement
City of Concord; Concord, CA
Construction Inspector |The project involved relocating and upgrading sanitary sewer infrastructure along Whitman Road, including replacing sewer mains, rehabilitating manholes, extending and reconnecting laterals, and a short sewer repair at the Whitman Road/Gilardy Drive intersection. Work also included bypass pumping, pavement rehabilitation, and traffic striping. Construction activities involved traffic control, stormwater pollution prevention, bypass pumping of sewer flows, open trench installation of sewer mains and laterals, manhole installation and rehabilitation, abandonment of the existing sewer main, and concrete work on curbs, gutters, sidewalks, and ramps. Additional tasks included cold-in-place recycling, asphalt paving, slurry seal, and final traffic markings. Ghirardelli provided inspection services and also maintained budget adherence, and ensured timely project completion.
Monument Boulevard Pavement Project
City of Concord; Concord, CA
Construction Inspector | Provided construction inspection for a pavement rehabilitation and pedestrian infrastructure improvement project along Monument Boulevard. Scope included mobilization, traffic control, stormwater pollution control, clearing and grubbing, tree trimming, asphalt concrete grinding and removal, asphalt concrete installation, and rubberized asphalt concrete installation.
Also oversaw asphalt dig-out repairs, lowering and restoring utility covers to grade, survey monument adjustments, and improvements to concrete curb ramps and sidewalks at select locations.
Castro Ranch Road Pavement Rehabilitation
City of Richmond; Richmond, CA
Construction Inspector | Provided construction inspection for the pavement rehabilitation of Castro Ranch Road from Olinda Road to the Richmond City Limit.
Work included traffic control, environmental protection, removal and replacement of concrete curbs, removal of sidewalks, removal and replacement of AC dike, cold milling of asphalt pavement, wedge and conform grinding, and pavement repairs.
Also oversaw thermoplastic traffic striping and markings for new bike lanes, traffic dividers, pedestrian pushbuttons, removing and placing signs and signposts, and median landscaping.
EXPERIENCE: 18 Years
TENURE W/GA: 9 Year
EDUCATION:
Coursework
REGISTRATIONS:
OSHA 30
BART Badge #66474
RWP Training
SSI Clearance
TWIC/Transportation Worker
Identification Credential,
Exp. 02/2029
Page | 2
MICHAEL WILLIAMS
CONSTRUCTION INSPECTOR
FY 2020-21 & 2021-22 Concrete and Curb Ramps Improvement Project City of Pacifica; Pacifica, CA
Construction Inspector | Inspected repair and construction of new concrete sidewalks, ADA curb ramps, driveways, and a storm drain at various locations within the City’s neighborhoods. Work included installing hot mix asphalt plugs and other miscellaneous work over 54 construction working days. Ghirardelli implemented a strict quality control regimen to confirm that the contractor understood the intent of the design and built the new curb ramps and sidewalks to ADA requirements. Mr. Williams worked with the contractor and the client to identify critical issues when laying out pull boxes, ramps, and street furnishings, and maintained compliance with ADA requirements despite steep hills, grade changes at corners, and existing infrastructure that did not always match plans.
Spinnaker Point Parking Modifications & I-80/Central Avenue Improvements City of San Rafael / City of Richmond; CA
Construction Inspector | Spinnaker Point: Inspected construction of retaining walls, new curb and gutter, sidewalk, AC paving, storm drain improvements, a bioretention facility, electrical and lighting, striping and signage, and planting and irrigation. Maintained daily inspection reports including photos, reviewed materials delivered to the site for compliance with specifications, coordinated material testing, monitored SWPPP compliance, and developed punchlists for project closeout. I-80/Central Avenue Phase 1: Inspected improvements at the I-80/Central Avenue interchange including traffic signal installation at I-580 ramps and installation of 17 new ADA curb ramps along Central Avenue between Highways 80 and 580.
I-80/Central Avenue Operational Improvements, Phase 1
City of Richmond; Richmond, CA
Construction Inspector | This project improved the traffic operations at the I-80/Central Avenue interchange and along Central Avenue between Rydin Road and San Pablo Avenue. The project was completed in two phases. Phase I redirected left turns from westbound Central Avenue onto I-80 WB to the adjacent I-580 eastbound on-ramp at Rydin Road during weekend peak hours and installed traffic signals at the I-580 ramps. The project also included installing 17 new ADA curb ramps along Central Avenue between Highways 80 and 580.
North San Mateo Drive Sustainable Street Project
City of San Mateo; San Mateo, CA
Construction Inspector | This project implemented “complete streets” improvements to North San Mateo Drive from Baldwin Avenue to Peninsula Avenue. The project provided pedestrian and bicycle safety improvements and included the installation of Class II bike lanes, curb extensions with green infrastructure, curb ramps, slurry seal/pavement rehabilitation, traffic signal installation, and miscellaneous striping improvements. Mr. Williams inspected and observed the contractor’s work for compliance with the contract documents and prepared daily inspection reports, including photos. Mr. Williams also coordinated material testing and verified quantities for monthly progress payments.
www.calpavements.com
June 4th, 2026
Charlie Krueger, PE | Division Director - Bay Area Region m: 510-867-4452 | 6601 Owens Drive, Suite 155, Pleasanton, CA 94588 Via Email
Subject: Proposal for Sewer Maintenance Project No.1 – Project No. 2733 Dear Mr. Krueger,
Thank you for the opportunity to support Ghirardelli Associates in delivering pavement preservation services to the City of Concord. CAL Pavement Management is pleased to provide this proposal for construction inspection and observation services for the asphalt rubber cape seal portion of the project. Drawing on extensive field experience and technical knowledge in pavement preservation, CAL Pavement Management will provide professional inspection services to assist with quality assurance, documentation, and successful project delivery.
Scope of Services
CAL Pavement Management will provide pavement preservation consulting and inspection services for the following:
Inspection Services for:
City of Concord – Sewer Maintenance Project No.1 – Project No. 2733 (Asphalt Rubber Cape Seal)
Pavement Preservation Services:
Pavement preservation inspection and construction observation services for assigned asphalt rubber cape seal operations, including:
• Observation of asphalt rubber binder application operation. • Observation of aggregate spreading, rolling, and sweeping activities • Verification of material temperatures, application rates, and equipment operation
• Monitoring of workmanship and conformance with project specifications • Documentation of field conditions, production activities, and observed deficiencies
www.calpavements.com
• Preparation of daily inspection reports and photo documentation • Coordination with contractor personnel, Ghirardelli Associates, and City staff as needed
• Attendance at preconstruction meetings and project coordination meetings. • Punch list preparation and follow-up observations.
• Optional inspection and observation services for slurry seal alternate operations if authorized by the City.
Rates and Payment Terms
Cesar Lara will provide construction inspection and observation services for the asphalt rubber cape seal portion of the project. Services will be provided at the hourly rates listed below and billed for actual hours worked.
The total compensation for the asphalt rubber cape seal portion of the project shall not exceed $10,000.00 (ten thousand dollars and zero cents) without prior authorization.
Should the City elect to proceed with the alternate slurry seal portion of the project and inspection services are requested, CAL Pavement Management shall provide those services on a time-and-materials basis for an additional not-to-exceed amount of $4,000.00 (four thousand dollars and zero cents).
Standard OT/Saturday (1.5x) DT/Sunday (2x)
Cesar Lara $250.00 $375.00 $500.00
Invoices will be submitted upon completion of services or monthly, whichever occurs first.
Payment is due within thirty (30) calendar days from the date of invoice (Net 30). Any invoices unpaid beyond this period may be subject to late fees as permitted by law.
www.calpavements.com
Contract Authority
As Principal of CAL Pavement Management, I am authorized to enter into this agreement on behalf of the firm. I will also serve as the main point of contact for this contract. Please direct all questions or correspondence to:
Cesar Lara
Principal, CAL Pavement Management
P: 925-494-8539
E: [email protected]
We appreciate the opportunity to partner with Ghirardelli Associates and support the City of Concord in the successful delivery of this asphalt rubber cape seal project. CAL Pavement Management looks forward to contributing to a quality project through professional inspection services, timely communication, and practical pavement preservation expertise.
Sincerely,
Cesar A. Lara
Principal
CAL Pavement Management
Acknowledgment and Acceptance
By signing below, the undersigned confirms acceptance of this proposal, and the terms outlined above.
Charlie Krueger, PE
Ghirardelli Associates
Client Signature: ____________________________
Date: _______________________________________
I. FIELD AND LABORATORY SERVICES
A. Geotechnical Services
1. 2701 Underground Utilities Compaction Testing (portal-to-portal) $134.00 /hr
2. 2701 Subgrade Compaction Testing (portal-to-portal) $134.00 /hr
3. 2701 Aggregate Base Compaction Testing (portal-to-portal) $134.00 /hr
4. 3451 Fill Acceptance Testing (Sieve & PI/EI) $215.00 /ea
5. 3461 Maximum Density Curves/4" (ASTM D1557) $330.00 /ea
6. 3462 Maximum Density Curves/6" (ASTM D1557) $390.00 /ea
7. 3463 Oversize Correction $86.00 /ea
B. Asphalt Concrete
1. 2801 AC Compaction Testing (w/ Nuclear Gauge, portal-to-portal) $134.00 /hr
2. 3622 Lab Test Maximum Density (LTMD) $530.00 /ea
C. Reinforcing Steel
1. 2201 Reinforcing Steel Placement Inspection $130.00 /hr D. Structural Concrete
1. 1201 Mix Design Review $240.00 /ea
2. 3403 Aggregate Testing $236.00 /ea
3. Cement Testing $160.00 /ea
4. 2301 Slab-on-Grade Concrete Placement & Sampling $130.00 /hr
5. 2301 Misc. Concrete Placement & Sampling $130.00 /hr
6. 2903 Epoxy/Anchor Installation $130.00 /hr
7. 2904 Anchor Proof-Load Testing (w/ equipment, portal-to-portal) $134.00 /hr
8. 3101 Concrete Compression Tests (set of 5/50cy) $68.00 /ea
9. 3136 Non-Shrink Grout Compression Test (set of 3) $86.00 /ea
10. 1302 Sample Transportation $99.00 ea
E. Engineering/Project Management/Miscellaneous
1. 1221 Project Manager $185.00 /hr
2. 1212 Structural Affidavit $575.00 /ea
3. 1307 Travel Time (roundtrip) $130.00 /hr
4. 1305 Mileage (roundtrip) $0.725 /mi
*Based upon (GSA) POV Mileage Reimbursement Rates (current rate is $0.725 per mile)
5. Administrative Fee 10% of Total Invoice
6. Special Handling Fee ** 3% of Total Invoice
ISI shall include the estimated cost to prepare the Final Affidavit on its first invoice to avoid delays. Preceding the release of Final Affidavit prepared by ISI, Client must have paid in full for all services provided by ISI pursuant to this Agreement.
ISI Estimate % of cost $50,000.00
City Of Concord
SPECIAL INSPECTION AND MATERIAL TESTING SERVICES
Sewer Maintenance Project #1
RATES TO PROVIDE
Project Number 2733
Rate
** Applicable when client requests Certified Payroll (CPR) uploads, special system programming/reporting, non-electronic or back-up documentation in addition to what is normally provided.
ISI Proposal tg 5-25-2026 1166
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F: 510.900.2101 Page 1 of 12
ISI Estimate % of cost $50,000.00
City Of Concord
SPECIAL INSPECTION AND MATERIAL TESTING SERVICES
Sewer Maintenance Project #1
RATES TO PROVIDE
Project Number 2733
II. BASIS OF CHARGES
A. Minimum Hourly Charges:
9003 Show-up/Cancellation 2 hours
9003NS Show-up/Cancellation (Night Shift) 8 hours
Inspector/Technician services (0 - 4 hours) 4 hours
Inspector/Technician services (4 - 8 hours) 8 hours
B. Rate for Field Inspectors:
Basic Rate $ 130.00/hr
Basic Rate w/ Testing Equipment $ 134.00/hr
Overtime (over 8 hrs Monday-Friday; first 8 hrs on Saturdays) 1.5 x Basic Rate Double-time (over 12 hrs Mon-Fri; over 8 hrs on Sat; Sundays & Holidays) 2 x Basic Rate Work performed on “RUSH” schedule 1.5 x Basic Rate
Night Shift Differential (shifts starting after 2pm/before 4am) 1.125 x Basic Rate C. Expenses:
1307 Travel Time, if required $ 99.00/hr
1305 Auto Mileage, if required At Cost
1306 Per Diem (Or cost if greater than $125.00/day) $ 185.00/day 1308 Miscellaneous Expenses (Parking/Tolls/Airfare) At Cost 1314 Outside Services Cost + 10%
D. Time and Materials Charges:
It shall be Client's sole responsibility to notify ISI of any prevailing wage requirements before any services are performed for the Project. Should it be revealed subsequent to the execution of an agreement for services that this project is indeed a prevailing wage project and if ISI is thereafter mandated to comply with those requirements, there will be a 10% surcharge to the hourly rates quoted in our Proposal. Additionally, in the event notification is not given to ISI, Client shall be fully responsible for payment of all fines, penalties, and/or damages imposed upon ISI for any failure to comply with the prevailing wage laws.
Actual charges are based solely upon time spent on the job site and the required and/or requested testing and laboratory services. Invoices will be submitted on a monthly or bi-weekly basis in accordance with these rates. All invoices include a summary of work performed to date, budget balance remaining and 10% administrative fee.
Prices quoted are valid through June 30, 2026.
Technical personnel (including laboratory staff) are members of the Operating Engineers (AFL-CIO) Local No. 3 and the above charges are a part of our contractual commitment. An annual COLA increase of 6% will be applied to the entire invoice amount starting on July 1st of each year to cover increases in labor, materials, and operational costs. For assignments that require equipment such as nuclear gauges, hydraulic systems for proofload testing, high-strength torque wrench etc., billing time will include picking up and dropping off the equipment at ISI's laboratory as well as round trip travel and milage.
ISI Proposal tg 5-25-2026 1166
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F: 510.900.2101 Page 3 of 12
CORPORATE HEADQUARTERS
1798 University Avenue
Berkeley, CA 94703-1514
T: 510.900.2100
F: 510.900.2101
Project Number 2733
Sewer Maintenance Project #1
City Of Concord
SCHEDULE OF FEES AND SERVICES
n Services will be performed on a time and materials basis at the unit rates listed. See attached Basis of Charges. n Prices are valid through June 30, 2026.
Personnel hourly rates and material testing rates for general and special services are contained in the following pages. n A 10% Administrative Fee will be added to each invoice total. Invoices requiring certified payroll uploads, or other special handling and/or backup documentation will incur an additional 3% fee added to invoice total.
ISI Fee Schedule
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F:510.900.2101 Page 9 of 12
PROFESSIONAL SERVICES
1109 Expert Witness………………………………………………………. 330.00 /Hr Masonry Division 1101 Principal………….………………………………………………….245.00 /Hr 2501 Masonry Block/Reinforcing/Grout Inspection………………….130.00 /Hr 1108 Geotechnical Engineer………………………………………………225.00 /Hr 2506 Brick Veneer/Exterior Façade Inspection………………………. 130.00 /Hr 1102 Professional Engineer…………………………………………………….. 215.00 /Hr 2504 Brick Veneer Façade Testing…………………………………….. 185.00 /Hr 1103 Staff Engineer…………………………………………………………195.00 /Hr 2505 Masonry Sampling/Tagging……………………………………..130.00 /Hr 1221 Project Manager………………………………………………………185.00 /Hr 2503 DSA Continuous Masonry Inspection……………………………. 185.00 /Hr 2112 Lead Inspector (Group 1)…………………………...………………. 134.00 /Hr 2109 Field Technician/Inspector………………………………………..130.00 /Hr Structural Steel Division 1106 Laboratory Technician………………………………………………. 161.00 /Hr 2601 Field Welding Inspection (visual)…………………………………..132.00 /Hr 1104 Administrative Services…………………………………………….100.00 /Hr 2602 Shop Welding Inspection (visual)………………………………….132.00 /Hr 1314 Contract Labor………………………………………………………. Cost+10% /Ea 2603 High Strength Bolting Inspection………………………………….. 132.00 /Hr 2608 NDT Ultrasonic Testing (UT)………………………………………. 134.00 /Hr INSPECTION SERVICES 2609 NDT Magnetic Testing (MT)……………………………………….134.00 /Hr Oversight Inspections 2610 NDT Liquid Dye Penetrant Testing (PT)………………………..134.00 /Hr 2107 DSA - OSHPD Certified Inspector (IOR)………………………… quote /Hr 2611 Inspection of Misc. Structural Steel/Welding (visual)………………. 132.00 /Hr 2108 Inspection in Hazardous Containment Area………………………235.00 /Hr 2612 Inspection of Steel Deck Welding/Shear Studs (visual)……………… 132.00 /Hr 2613 Witness Welding Qualification Tests……………………………….. 132.00 /Hr Soils/Asphalt Division 2614 Inspection of Welding of Non-Structural Elements………………132.00 /Hr 2701 Field Compaction Testing with Nuclear Gauge………………………………. 134.00 /Hr 2615 Material Identification to CMTR and/or Sampling…………………132.00 /Hr 2703 Soils Observation……………………………………….................. 130.00 /Hr 2616 Inspection of Curtain Wall Attachment……………………………132.00 /Hr 2702 Material Sampling/Transportation…………………………………130.00 /Hr 2617 Radiographic Examination (by others)…………………………….. Cost+10% /Hr 2704 Sampling of Grout for Soil Nails or Tiebacks…………………….130.00 /Hr 2618 Pile Splice Welding Inspection…………………………………….. 132.00 /Hr 2705 Sampling of Soil-Cement Mixture…………………………………. 130.00 /Hr 2620 Sampling of End-Welded Studs………………………………….. 132.00 /Hr 2706 Observation of Soil Nail or Tieback Stressing……………………130.00 /Hr 2621 Sampling of High Strength Bolts (HSB)………………………….132.00 /Hr 2707 Pile/Pier Observation………………………………………………130.00 /Hr 2622 Level III UT and MT Technician……………………………………. 205.00 /Hr 2708 Geotechnical Observation by Inspector………………………….. 134.00 /Hr 2623 Inspection of Cold-formed Metal Framing …………………………132.00 /Hr 2709 Field Compaction Testing with Sandcone………………………..134.00 /Hr 2710 Field Compaction Testing with Rubber Balloon………………….. 134.00 /Hr Fireproofing/Roof/Wood/Waterproofing Division:
2801 AC Observation/Compaction Testing…………………………….. 134.00 /Hr 2901 Fireproofing Density/Thickness Testing…………………………. 130.00 /Hr 2802 QC/QA Technician (Caltrans/FAA/NICET certified)……………………….134.00 /Hr 2906 Firestop System Inspection…………………….. 185.00 /Hr 2803 QC/QA Technician (Caltrans/FAA/NICET) 10hr-day……………………. 1,727.00 /Day 2917 Roofing/Waterproofing Inspection……………………………….. 185.00 /Hr 2804 AC Batch Plant Inspection/Sampling…………………………….130.00 /Hr 2905 Shearwall/Diaphragm Nailing Inspection…………………………185.00 /Hr 2908 Glu-lam Shop Inspection………………………………………….. Cost+10% /Hr Concrete/Shotcrete Division 2918 Inspection of Plaster/Stucco Application/Sampling…………….. 130.00 /Hr 2301 Concrete Placement Inspection……………..……………………130.00 /Hr 2312 Concrete Sampling………………………………………………. 130.00 /Hr Specialty Testing Division 2311 Sampling of Lightweight Insulating Concrete………………………. 130.00 /Hr 2904 Proof Load/Torque Testing……………………………………….. 134.00 /Hr 2308 Installation of Maturity Sensors…………………………………….. 130.00 /Hr 2903 Witness Dowel/Anchor Installation……………………………..130.00 /Hr 2605 NS Grout Inspection/Sampling……………………………………. 132.00 /Hr 2909 Ferroscan Survey………………………………………………….. 235.00 /Hr 2305 Batch Plant Inspection……………………………………………..130.00 /Hr 2920 Ground Penetrating Radar Survey (GPR)…………………………235.00 /Hr 2302 Shotcrete Placement Inspection…………………………………….. 130.00 /Hr 2913 Floor Flatness Survey (Dipstick, F-Meter, D-Meter)………………………………….. 185.00 /Hr 2307 DSA Shotcrete Placement Inspection…………………………….. 185.00 /Hr 2916 Moisture Emission Testing Placement/Pick-Up…………………130.00 /Hr 2303 Witness of Rebar and Shotcrete for Pre-Construction……………… 130.00 /Hr 2914 Intumescent Paint Thickness Inspection…………………………. 134.00 /Hr 2304 Coring/Eval. of Precon Panel (3 cores, up to 6" long)………………….1,725.00 /Ea 2306 Coring Technician, One Man………………………………………. 235.00 /Hr 2310 QC/QA Technician (NICET)………………………………………. 134.00 /Hr 2919 Inspection of Polymer Matrix Composite (Fibrwrap)…………….134.00 /Hr 2921 Inspection of Crack Repair Measures……………………………. 130.00 /Hr Reinforcing/Strand Steel Division 2922 Ground-Resistance Testing……………………………………….. 235.00 /Hr 2201 Rebar Placement Inspection………………………………………. 130.00 /Hr 2902 In-place Brick Mortar Shear Testing………………………………185.00 /Hr 2203 Rebar/Strand ID Sampling/Tagging…………………………… 130.00 /Hr 2915 Rebound Hammer Testing (ASTM C805)………………………… 235.00 /Hr 2204 Rebar/Strand ID Sampling…………………………… 130.00 /Hr 2202 Verification of Rebar Placement with Pachometer………………. 235.00 /Hr 2205 Rebar/Strand Tagging…………………………… 130.00 /Hr 9005 Epoxy Injection Inspection……………………………………….130.00 /Hr 2402 PT Strand Stressing Inspection………………………………….130.00 /Hr 2927 QC/QA Manager……………………………………………… 185.00 /Hr 2403 Prepare Stressing Records (Loads/Elong/Lockoff)……………………….. 130.00 /Hr 2404 Anchor Pocket Grouting after Stressing………………………..130.00 /Hr
PROFESSIONAL SERVICES
qg pyp, p
handling and/or backup documentation will incur an additional 3% fee added to invoice total.
ISI Fee Schedule
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F:510.900.2101 Page 10 of 12
Aggregate and Soils Mechanics Asphaltic Concrete (cont.) 3401 Sieve Fine/Coarse Aggregates ASTM C136/CT 202………………. . . . . . . 137.00 /Ea 3608 Recommending Optimum Bitumen Content CT 367……………………….. 3,100.00 /Ea 3402 Materials Finer than # 200 Sieve by Washing ASTM C117……………………… 126.00 /Ea 3609 Optimum Bitumen Content of Open Grade CT 368………………895.00 /Ea 3403 Gradation ASTM C117 and C136…………………………………………………... 236.00 /Ea 3610 QC Plan for Caltrans QC/QA projects………………………….. 1,900.00 /Ea 3404 Sp. Gravity/Absorption of Coarse Agg ASTM C128/CT 206……….………… 110.00 /Ea 3611 Tensile Strength Ratio ASTM D4867……………………………………… 1,625.00 /Ea 3405 Specific Gravity/Absorption of Fine Agg ASTM C128/CT 207…….……….. 153.00 /Ea 3612 Marshall Compacted Sample (set of 3) ASTM D1559…………………. 326.00 /Set 3407 Bulk Density (Unit Weight) and Voids of Agg ASTM C29…………….. 137.00 /Ea 3613 Marshall Stability and Flow, Air Voids ASTM D1559, D3203…………………….. 137.00 /Ea 3413 Clay Lumps and Friable Particles in Agg ASTM C142…………………. 86.00 /Ea 3614 Bulk Specific Gravity of Core Sample ASTM D2726…….……………. 93.00 /Ea 3414 Cleanness Value of Coarse Agg CT 227…………….…………….215.00 /Ea 3615 Theoretical Max Specific Gravity (Rice) ASTM D2041………………163.00 /Ea 3416 Aggregate Durability Index ASTM D3744/CT 229…………………………….….. 410.00 /Ea 3616 Sieve Analysis of Extracted Aggregate ASTM D5444……………………… 221.00 /Ea 3417 Percent Crushed Particles ASTM D5821/CT 205…………………………….….. 273.00 /Ea 3617 Marshall Mix Design………………………………………………. 3,100.00 /Ea 3418 Fine Aggregate Angularity ASTM C1252/CT 234…………………………….….. 153.00 /Ea 3618 Bulk Specific Gravity of Compacted Samples ASTM D1188………………………… 137.00 /Ea 3450 Materials Finer than No. 200 Sieve ASTM D1140…………………….…121.00 /Ea 3619 Swell of Bituminous Mixtures CT 305………………………………168.00 /Ea 3451 Liquid Limit, Plastic Limit and PI ASTM D4318/CT 204………….……………. 215.00 /Ea 3620 Moisture Vapor Susceptibility of Mixture CT 307………….…………. 300.00 /Ea 3452 Particle Size Analysis of Soils ASTM D422………………………….…. 221.00 /Ea 3621 Centrifuge Kerosene Equivalent and ABR CT 303……………………… 252.00 /Ea 3453 Hydrometer Analysis, incl Sp. Gravity ASTM D422………………….…500.00 /Ea 3622 Lab Test Maximum Density CT 375………………………………530.00 /Set 3454 Soil Classification ASTM D422, D1140, D4318………………………………………..…. 530.00 /Ea 3455 Specific Gravity of Soils ASTM D854/CT 209………………………………..…… 221.00 /Ea Concrete/Shotcrete Products 3456 Moisture Content of Soil/Agg ASTM D2216/C566/CT 266…………………..…. 48.00 /Ea 3101 Compression Test 4"x8" Cylinder ASTM C39………………………………..... 68.00 /Ea 3457 Moisture Content & Density of Soil from Borings…………… 63.00 /Ea 3105 Compression Test: Shotcrete/Concrete Core ASTM C42…………………… 126.00 /Ea 3458 Sand Equivalent for Soils/Fines ASTM D2419/CT 217………………………..… 184.00 /Ea 3106 Unit Weight of Freshly-Mixed Concrete ASTM C138……………………….. 65.00 /Ea 3459 Lab Compaction (Standard) A/B (4"Mold) ASTM D698…………..……. 330.00 /Ea 3107 Density, Absorption, Voids in Hard Concrete ASTM C642……………….. 103.00 /Ea 3460 Lab Compaction (Standard) C (6"Mold) ASTM D698……………..…... 390.00 /Ea 3108 Concrete Trial Batch (IBC or CCR Title 24, per W/c Ratio)…………………………….. 2,365.00 /Ea 3461 Lab Compaction (Modified) A/B (4" Mold) ASTM D1557……………..… 330.00 /Ea 3120 Modulus of Elasticity of Concrete ASTM C469………………………………….. 300.00 /Ea 3462 Lab Compaction (Modified) C (6" Mold) ASTM D1557………………..… 390.00 /Ea 3121 Compression Test of Samples not Taken by ISI………………….. 86.00 /Ea 3463 Oversize Correction for Lab Compaction ASTM D4718……………..………… 86.00 /Ea 3124 Drying Shrinkage of Concrete Beams ASTM C157 set of 3………………….. 588.00 /Set 3464 Unconfined Comp. Strength inc. MD ASTM D2166/CT 221…..……………….. 179.00 /Ea 3125 Concrete Splitting Tensile Strength ASTM C496………………………. 103.00 /Ea 3465 Density/Unit Weight by Sand Cone Method ASTM D1556…………..…55.00 /Ea 3126 Unit Weight of Controlled Density Material……………………….. 82.00 /Ea 3466 R-Value of Compacted Soils w/no Addt ASTM D2844/CT 301…………………………..….. 583.00 /Ea 3128 Flexural Strength of Concrete ASTM C78/CT 523……………………………. 153.00 /Ea 3467 California Impact Test Max Wet Density CT 216………………….438.00 /Ea 3131 Compressive Strength: Insulating Concrete ASTM C495……………… 82.00 /Ea 3468 Maximum Index Density on Vibratory Table ASTM D4253…………..…. 436.00 /Ea 3132 Density of Lightweight Concrete ASTM C567…………………………………….. 126.00 /Ea 3469 Organic Impurities in Fine Aggregate ASTM C140………………..……. 76.00 /Ea 3133 Creep of Concrete (per month) ASTM C512……………………………………….. 325.00 /Ea 3470 California Bearing Ration (CBR), 3 points ASTM D1883……………..…. 945.00 /Ea 3134 Flexural Toughness (FRC) Beams ASTM C1018……………………………….. 325.00 /Ea 3471 LA Abrasion Resistance ASTM C131………………………………….. 305.00 /Ea 3135 Flexural Toughness (FRC) Round Panels ASTM C1550…………………….. 416.00 /Ea 3472 Aggregate Soundness Sodium Sulfate ASTM C88/CT214……………. 136.00 /Ea 3129 Calibration of Concrete w/ Maturity System (17 cylinders)………………. 1,628.00 /Set 3473 Expansion Index…………………………………………….. 173.00 /Ea 3130 Petrographic Analysis (by others)………………………………….Cost+10% /Hr 3474 R-Value of Compacted Soils w/Field Addt ASTM D2844/CT 301…………………………..….. 630.00 /Ea 3140 Compression Test 6"x12" Cylinder ASTM C39………………………………..... 92.00 /Ea 3475 R-Value of Compacted Soils w/Lab Addt ASTM D2844/CT301………………..……. 725.00 /Ea 2911 Concret Moisture Vapor Emission Kit ASTM F1869…………………………….. 60.00 /Ea 3476 California Bearing Ratio (CBR) no curve ASTM D1883………………..……. 585.00 /Ea 2923 Concrete In-Situ Relative Humidity ASTM F2170 Add to hrly…………….. 60.00 /Ea 3477 Flat & Elongated Particles ASTM D4791………………..…………………. 252.00 /Ea 2924 pH Value Determination Add to hrly rate………………………………………………. 19.00 /Ea 3478 CTB Compressive Strength (Field Mixed ASTM D1633/D559) 163.00 /Ea 2309 Concrete Maturity Sensors…………………………………………. 100.00 /Ea Asphaltic Concrete Products Fireproofing/Roof/Wood/Waterproofing Products 3601 Moisture Content of Asphalt Mixture CT 370…………………….. 86.00 /Ea 3701 Density of Spray Applied Fireproofing UBC 7-6………………………………. 86.00 /Ea 3602 Bulk Specific Gravity of Bituminous Mixture CT 308………………. 100.00 /Ea 2912 Cohesion/Adhesion Test Kit (SFRM)…………………………... ………. 60.00 /Ea 3603 Theoretical Maximum Sp. Gravity and Density CT 309……………………… 158.00 /Ea 3702 Compression Test: Plaster Cylinder/Cube ASTM C472……………. 86.00 /Ea 3604 Asphalt Content by Vacuum Extraction ASTM D2172/CT 362……………………. 142.00 /Ea 3703 Density of Plaster Cylinder or Cube ASTM C472……………………………… 86.00 /Ea 3605 Asphalt Content by Ignition Method ASTM D6307/CT 382……………………… 242.00 /Ea 3704 Bond Strength of Tile ASTM C482………………………………………………………. 462.00 /Set 3606 Asphalt Content by Nuclear Method ASTM D4125/CT 379………………………. 121.00 /Ea 3705 Tensile Test of Polymer Material (Fibrwrap) ASTM D3039………………. 815.00 /Set 3607 Stabilometer Value ASTM D1560/CT 366……………………………………….. 189.00 /Ea 3708 Tensile Test of FRP (delivered by others for testing) ASTM D3039………………. 660.00 /Set 3709 Calibration of Torque Wrench (20-200 ft-lbf) 84.00 /Ea
LABORATORY SERVICES
ISI Fee Schedule
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F:510.900.2101 Page 11 of 12
Masonry Products Engineering Review/Miscellaneous Items 3109 Drying Shrinkage of CMU Units ASTM C426……………………………………. 271.00 /Ea 1201 Concrete Mix Design Review UBC or CCR Title 24……………………………….... 240.00 /Ea 3110 CMU Shrinkage, Absorption, Moisture, Unit Wt. ASTM C140……………….. 1,480.00 /Set 1202 Shotcrete Mix Design Review UBC or CCR Title 24…………………………….... 240.00 /Ea 3123 CMU Core Shear Test CCR Title 24, per side………………………………………….. 126.00 /Ea 1203 Grout Mix Design Review UBC or CCR Title 24………………………………………. 240.00 /Ea 3136 Compression Test 2"x2" Cube ASTM C109……………………………86.00 /Ea 1204 Review of Welding Documents (WPS)………………………………215.00 /Hr 3102 Compression Test 2"x4" Mortar or Grout ASTM C39………………..68.00 /Ea 1205 Review of Documents ………………...……………………………. 215.00 /Hr 3103 Compression Test 4"x4" Grout Prism ASTM C39………………………86.00 /Ea 1206 Jobsite Meetings/Supervision………………………………………. 195.00 /Hr 3104 Compression Test Masonry Prism ASTM C1314………………………. 223.00 /Ea 1210 Final Inspection Affidavit UBC 1701, up to 3 visits……………………………………. 320.00 /Ea 3137 Compression Test Masonry Block ASTM C140………………………. 142.00 /Ea 1211 Final Inspection Affidavit UBC 1701, up to 10 visits…………………………………….. 450.00 /Ea 1212 Final Inspection Affidavit UBC 1701, up to 25 visits……………………………………. 575.00 /Ea Reinforcing Steel Products 1213 Final Inspection Affidavit UBC 1701, up to 100 visits…………………………………. 995.00 /Ea 3201 Tensile and Bend #3 to #8 ASTM A370……………………………….. 153.00 /Ea 1214 Final Inspection Affidavit UBC 1701, more than 100 visits………………………… 1,270.00 /Ea 3202 Tensile and Bend #9 to #11 ASTM A370………………………………205.00 /Ea 1215 Laboratory Final Verified Report DSA or OSHPD…………………………………. 360.00 /Ea 3203 Tensile and Bend #14 and #18 ASTM A370………………………….. 1,082.00 /Ea 1216 Geotechnical Final Verified Report DSA or OSHPD…………………………….. 690.00 /Ea 3204 Slip Test of Mechanical Splice CT 670…………………………………… 132.00 /Ea 1217 QC/QA Engineering Consulting Services………………………….. 215.00 /Hr 3205 PT Strand Breaking Strength……………………………………………….. 378.00 /Ea 1218 Pavement Design/ Consulting……………………………………….. 240.00 /Hr 3206 PT Strand Yield/Breaking Strength/Elongation……………………… 431.00 /Ea 1219 Soil Compaction Test Review (by Geotechnical Engineer)…………………………………………. 240.00 /Hr 3207 Tensile Test of Coupled Rebar…………………………………. 205.00 /Ea 1220 Asphalt Mix Design Review…………………………………………. 240.00 /Ea 3208 Tensile Test of Welded Rebar………………………………………205.00 /Ea 2001 Destructive Exposure of Rebar……………………………………… 235.00 /Hr 2002 Destructive Sampling of Rebar…………………………………….. 235.00 /Hr Structural Steel/Welding Products 2003 Destructive Sampling of Concrete…………………………………. 235.00 /Hr 3301 Rockwell Hardness ASTM A370, E18………………………………………………………. 82.00 /Ea 2004 Patching of Exposed Sample Areas w/ HS Grout………………… 185.00 /Hr 3302 Charpy Impact 45 deg. V (to 100F) ASTM A370, E23………………………….. 431.00 /Ea 3303 Macroetch Examination Welded Test Joints AWS D1.1, 1.4……………. 236.00 /Ea Travel, Mileage, Transportation Expenses 3304 Reduced Section Tensile ASTM A370……………………………….... 147.00 /Ea 1301 Courier/Transportation……………………………………………... 99.00 /Hr 3305 Guided Bends; side, root, or face AWS D1.1………………………..45.00 /Ea 1305 Mileage…………………………………………………………………0.725 /Mile 3306 All Weld Metal Tensile AWS D1.1……………………………………………………….. 147.00 /Ea 1306 Per Diem (or at cost if higher)……………………………………….. 185.00 /Day 3307 Tensile Test of Miscellaneous Steel ASTM A370……………………………….. 147.00 /Ea 1307 Travel Time …………………………………………………………… 130.00 /Hr 3308 Tensile and Bend Test of Miscellaneous Steel ASTM A370…………….. 180.00 /Ea 1308 Parking………………………………………………………………..cost /Ea 3310 Mechanical Properties of HSB w/ nuts/Washers…………………. 362.00 /Set 1309 Bridge Tolls…………………………………………………………..cost /Ea 3311 Mechanical Properties of End-Welded Studs ASTM A370……………168.00 /Ea 1310 Car Rental…………………………………………………………..cost /Ea 3312 Mechanical Properties of Nut Only……………………………………189.00 /Ea 1311 Airfare…………………………………………………………………. cost /Ea 3313 Mechanical Properties of Bolt Only………………………………………. 137.00 /Ea 1312 Equipment Rental……………………………………………………. Cost+10% /Ea 3314 Mechanical Properties of Washer Only………………………………137.00 /Ea 1313 Mobilization……………………………………………………………130.00 /Hr 2604 Calibration of Torque Wrench for HSB…………………………….. 290.00 /Set 1314 Outside Services (Subconsultants/Subcontractors)………………… Cost+10% /Ea 2619 Welder Qualification Test Record (Excluding Lab Tests)………………………….. 132.00 /Hr ISI Fee Schedule
2025A-5/28/2026
1798 University Avenue, Berkeley, CA 94703-1514
T: 510.900.2100 F:510.900.2101 Page 12 of 12
Staff Report
Date: August 11, 2026
To: City Council
From: Mindy Gentry, Director of Community Development
Reviewed by: Carlton Thompson, PE, City Engineer
Bruce Davis, PE, CIP Manager
Prepared by: Justine Gee, PE, Associate Civil Engineer
[email protected]
(925) 671-3284
Subject: Considering the following actions for the Camp Concord Maintenance Repairs to Buildings (Project No. 2533) located in South Lake Tahoe:
1. Award of a construction contract in the amount of
$562,265.00 to D.G. Granade, Inc. and authorizing up to 10% contingency for contract change orders; and authorize the City Manager to execute the contract in a form acceptable to the City Attorney (Parkland and General Funds);
2. Approval of a budget transfer and appropriation in the amount of $410,000.00 from the Civic Center Roof
Replacement (Project No. 2429), (General Fund); and
3. Authorizing the City Engineer to accept the improvements upon completion of the Camp Concord Maintenance
Repairs to Buildings and directing the City Clerk to file a Notice of Completion. (Parkland Fund, Capital Projects
Fund)
4.e
City Council Agenda Report
Agenda Item No. 4.e
August 11, 2026
CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15273, 15378, 15301, 15302, 15304, and/or Public Resources Code Section 21065.
Report in Brief
The Camp Concord Maintenance Repairs to Buildings (Project No. 2533) (Project) will involve maintenance of the cabin decks and the lower bath house at the Camp Concord property located in South Lake Tahoe. The work consists of the replacement of existing cabin decks, the lower bath house roof and structural elements and bathroom fixtures.
See attached location map (Attachment 1).
The Project has been designed, competitively bid, and is ready for construction contract award. If the award is approved by City Council (Council), construction is expected to begin in August 2026 and be completed in October 2026, weather permitting. The construction contract with D.G. Granade, Inc. is attached (Attachment 3).
Recommended Action
1. Award a construction contract in the amount of $562,265.00 to D.G. Granade, Inc. and authorize up to 10% contingency for contract change orders for the Camp Concord Maintenance Repairs to Buildings (Project No. 2533); and authorize the City Manager to execute the contract in a form acceptable to the City Attorney (Parkland and General Funds);
2. Approve a budget transfer and appropriation in the total amount of $410,000.00 from the Civic Center Roof Replacement (Project No. 2429), (General Fund);
3. Authorize the City Engineer to accept the improvements upon completion of Camp Concord Maintenance Repairs to Buildings (Project No. 2533) and direct the City Clerk to file a Notice of Completion; and
4. Make the CEQA determinations as reflected in this staff report.
Background
On June 28, 2022, Council adopted the Two-Year Capital Budget for Fiscal Years 2022- 23 and 2023-24, which included funding for the design and construction of the Project.
The Project is intended to replace 21 cabin decks to meet Americans with Disabilities Act (ADA) requirements, current building codes, and USDA Forest Service’s safety requirements. The Project will also provide needed replacement of the deteriorating lower bath house bathroom fixtures, stall partitions, exterior cinder block walls, and roof.
Since this Project is proposing improvements to the lower bath house’s existing roof, the Project scope at the lower bath house was expanded to also include the replacement of
City Council Agenda Report
Agenda Item No. 4.e
August 11, 2026
the support beams that are part of the Camp Concord Lower Camp Bath House Roof/Structural Upgrade Cabin Flooring Project (Project No. 2776). The structural upgrades were added to the Project to ensure that all planned lower bath house improvements were performed at the same time.
Analysis/Procurement Process
The Project will perform maintenance to existing buildings at Camp Concord, located in South Lake Tahoe. Construction is anticipated to begin in August 2026 and be completed in October 2026, weather permitting.
Construction Contract
The Project was advertised for construction bids as required by state law and City policy with the Engineer’s Estimate for the total bid at $500,000. Two bids were received and opened on July 23, 2026, with amounts ranging from $562,265.00 to $898,613.17.
The basis of award for the Project is the total bid, and the lowest bid was received from D.G. Granade, Incorporated of Shingle Springs, CA (D.G. Granade).
A summary of the two bids is as follows (Attachment 2):
BID
SCHEDULE
Engineer’s
Estimate
D.G. Granade,
Inc.
Pro-Ex
Construction,
Inc.
Total Bid $500,000.00 $562,265.00 $768,903.17
D.G. Granade was the lowest bidder and submitted a responsive and responsible bid.
D.G. Granade has an appropriate and valid contractor’s license and has previously completed many other building projects in the Lake Tahoe area.
City staff completed analysis of D.G. Granade’s bid, determining that this contractor along with its subcontractors possess appropriate and valid licenses, and are not on any debarred lists. D.G. Granade is registered with the Department of Industrial Relations as required by Senate Bill 854.
Financial Impact
The current remaining budget for the Camp Concord Maintenance Repairs to Buildings is $286,000 (Fund 450 – Parkland Funds). There are insufficient funds in the Project to award the construction contract to D.G. Granade and cover a 10% contingency for contract change orders that may occur. A budget transfer in the total amount of $410,000 is needed from the completed Civic Center Roof Replacement (Project No. 2429) (Fund 400 – General/Capital Projects Fund).
Approval of the above budget transfer will fully fund the construction contract with D.G.
Granade and cover the 10% contingency needed for contract change orders.
City Council Agenda Report
Agenda Item No. 4.e
August 11, 2026
Environmental Determination
Pursuant to California Environmental Quality Act (CEQA) of 1970, Public Resources Code Section 21000, et. seq., as amended and implementing State CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations (collectively “CEQA”), the award of the contract does not constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Regs. Sections 15060(c), 15273, 15378, as it has no potential for resulting in a direct or reasonably foreseeable indirect physical change in the environment and/or the activities consist of creation of government funding mechanisms or other government fiscal activities which do not constitute a “project”. Even if Council action on this item did constitute a project under CEQA, it falls within the “common sense” exemption set forth in 14 Cal. Code Regs. Section 15061(b)(3), excluding projects where “it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.” In the alternative, Council action on this item is exempt under CEQA Guidelines Sections 15301 – Existing Facilities, 15302 – Replacement and Reconstruction, and 15304 – Minor Alterations to Land, as it involves pavement rehabilitation, striping, and concrete work. No unusual circumstances exist and none of the exceptions under CEQA Guidelines Section 15300.2 applies. Accordingly, no further environmental review is warranted. This determination reflects the City’s independent judgement and analysis. The Notice of Exemption will be filed with the County Clerk’s office and the State’s Office of Land Use and Climate Innovation following the Council award of the construction contract.
Public Contact
The City Council Agenda was posted.
Attachments
1. Project Location Map
2. Bid Summary
3. Construction Contract with D.G. Granade, Inc.
PROJECT
LOCATIONCAMP CONCORD MAINTENANCE REPAIRS TO BUILDINGS
PROJECT NO. 2533 Attachment 1
City of Concord
Bid Sheet
Bid Opening:
Thursday,
July 23,2026
2:30 p.m.
Camp Concord Maintenance Repairs to
Buildings
Zoom Garden Conference
Engineer's Estimate: $ To be awarded:
CoMPANY ToTAL BID
D.G. Granade, Inc.
4420 Business Drive
Shingle Springs, CA 95682
DIR: 1000004110
$s62,26s.00
Pro-Ex Construction, Inc.
3223 LuyungDr
Rancho Cordova, CA, 95742
DIR: 1000015770
$898,613.17
Contact: Justine ext. 3284
PROJECT #2533
500,000
After bid analysis revised to:
$768,903.17
Attachment 2
Camp Concord Maintenance Repairs 2026 Form CONTRACT
Project 2533 Page 21
Contract
This public works contract (“Contract”) is entered into by and between the City of Concord (“City”) and _______________________________________ (“Contractor”), for work on the Camp Concord Maintenance Repairs to Buildings Project (“Project”).
The parties agree as follows:
1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On _____________, 20___, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below.
City has elected to include the following bid alternate(s) in the Contract: No alternates.
2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all Contract Documents, including this Contract.
2.1 Notice Inviting Bids;
2.2 Instructions to Bidders;
2.3 Addenda, if any;
2.4 Bid Proposal and attachments thereto;
2.5 Contract;
2.6 Payment and Performance Bonds;
2.7 General Conditions;
2.8 Special Conditions;
2.9 Project Plans and Specifications;
2.10 Change Orders, if any;
2.11 Notice of Potential Award;
2.12 Notice to Proceed; and
2.13 The following: No other documents.
3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents.
4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor $___________________ (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.
5. Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, within 30 working days from the start date set forth in the Notice to Proceed (“Contract Time”). See below for specific allowed construction dates.
There will be no exceptions to these dates. By signing below, Contractor expressly waives any claim for delayed early completion.
Lower Bathhouse & Lower Camp Cabin Decks (Animal Cabins): Construction can start on August 10, 2026 at the earliest.
August 11 26
D.G. Granade, Inc.
562,265.00
Attachment 3
Camp Concord Maintenance Repairs 2026 Form CONTRACT
Project 2533 Page 22
Upper Camp Decks (Numbered Cabins): Construction can only take place between September 28 – October 11, 2026, no exceptions.
6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $1,300 per day for each day of unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract.
7. Labor Code Compliance.
7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.
7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.
7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”
9. Conflicts of Interest. Contractor, its employees, Subcontractors, and agents may not have, maintain, or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract.
10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City.
11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated, and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows:
Camp Concord Maintenance Repairs 2026 Form CONTRACT
Project 2533 Page 23
City:
Camp Concord Maintenance Repairs to Buildings (PJ 2533) 1950 Parkside Drive M/S 40
Concord, CA 94519
Attn: Justine Gee, Associate Civil Engineer
[email protected]
Contractor:
Name:_____________________________________
Address:___________________________________
City/State/Zip:_______________________________
Phone:_____________________________________
Attn:_______________________________________
Email:______________________________________
Copy to:____________________________________
12. General Provisions.
12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns.
12.2 Third Party Beneficiaries. There are no intended third party beneficiaries to this Contract.
12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Contra Costa County Superior Court, and no other place.
Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Contra Costa County, California.
12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.
12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor.
12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.
12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code § 313.
D.G. Granade, Inc.
4420 Business Drive
Shingle Springs, CA 95682
530-677-7484
Robert Granade
[email protected]
Camp Concord Maintenance Repairs 2026 Form CONTRACT
Project 2533 Page 24
The parties agree to this Contract as witnessed by the signatures below:
CITY: Approved as to form:
s/_______________________________ s/__________________________________ ________________________________ ___________________________________ Name, Title Name, Title
Date: ___________________________ Date: ______________________________ Attest:
s/_______________________________
_________________________________
Name, Title
Date: ___________________________
CONTRACTOR: ___________________________________________________ Business Name
s/_______________________________ Seal:
_________________________________
Name, Title
Date: ____________________________
Second Signature (See Section 12.8):
s/_______________________________
_________________________________
Name, Title
Date: ____________________________
___________________________________________________
Contractor’s California License Number(s) and Expiration Date(s) FINANCE DIRECTOR'S CERTIFICATION:
Concord, California
Jerome C. Wilverding, City Manager Susanne Brown, City Attorney Joelle Fockler, MMC, City Clerk
D.G. Granade, Inc.
Robert Granade, Vice President
CSLB #581408, Exp. 5/31/2027
Camp Concord Maintenance Repairs 2026 Form CONTRACT
Project 2533 Page 25
Date:
I HEREBY CERTIFY THAT ADEQUATE FUNDS EXIST OR WILL BE RECEIVED DURING THE CURRENT FISCAL YEAR 2025-2026 TO PAY THE ANTICIPATED EXPENSES TO BE INCURRED PURSUANT TO THIS CONTRACT.
THE SUM OF $______________ Account Code _____________________
Finance Director's Signature
END OF CONTRACT
562,265.00 450-2533-115-74200 & 400-2533-115-74200
Staff Report
Date: August 11, 2026
To: City Council
From: Mindy Gentry, Director of Community Development
Reviewed by: Aaron Sage, Planning Manager
Carlton Thompson, PE, City Engineer
Bruce Davis, PE, CIP Manager
Prepared by: Justine Gee, PE, Associate Civil Engineer
[email protected]
(925) 671-3284
Subject: Considering award of an on-call construction contract for OnCall Citywide Sewer Lateral Replacement & Sewer Main Spot Repair (Project No. 2244) to FJ&I Engineering Inc. for one year (with three one-year extensions possible) in the amount not-toexceed $350,000 annually; and authorizing the City Manager to execute the contract in a form acceptable to the City Attorney. (Sewer Enterprise Fund)
CEQA: Not a project/exempt per CEQA Guidelines Sections 15060(c), 15061(b)(3), 15378, 15301, 15302, 15304, and/or Public Resources Code Section 21065.
Report in Brief
The Capital Improvement Program project titled “On-Call Citywide Sewer Lateral Replacement & Sewer Main Spot Repair (Project No. 2244)” is to provide City staff with access to an on-call sewer contractor to perform as-needed repairs to sewer lateral and main lines. The project is specified as a one-year “on-call” services contract with a renewable option for up to three additional years upon mutual agreement of the Contractor and the City. This on-call service would be used for projects that are either emergencies or have a cost under $75,000, including replacement of damaged City4.f
City Council Agenda Report
Agenda Item No. 4.f
August 11, 2026
owned service laterals and spot-repairs on sewer mains to ensure adequate flow, and to reduce overflows and groundwater infiltration into the sewer system.
Four bids were received and opened on Thursday, July 16, 2026. FJ&I Engineering Inc. of San Pablo, California was considered the apparent low bidder.
Recommended Action
Award an on-call construction contract for On-Call Citywide Sewer Lateral Replacement & Sewer Main Spot Repair (Project No. 2244) to FJ&I Engineering Inc. for one year (with three one-year extensions possible) in a not to exceed amount of $350,000 annually; authorize the City Manager to execute the contract in a form acceptable to the City Attorney; and make the CEQA determinations as provided in this staff report.
Background
The City of Concord owns and operates its sewer collection system and also maintains and operates the system owned by the City of Clayton. Periodic maintenance and repairs for both systems are performed by City of Concord staff except when the scope or complexity of a repair exceeds available staff expertise or equipment.
Responsibility for sewer lateral maintenance varies depending on how the system was constructed. A sewer lateral generally includes an upper portion that extends from a building to a cleanout at the property line and a lower portion that extends from the cleanout to the sewer main in the street. In newer construction where a cleanout has been installed at the property line and the lower lateral has passed pressure testing and has been accepted by the City, Concord takes responsibility for maintaining and repairing the lower portion of the lateral. In situations where no cleanout exists, or where a cleanout exists but the lower lateral has not been accepted by the City, the property owner is responsible for maintenance and repair of the entire lateral.
The bid package for this project was structured as an “on-call” service contract for the repairs to sewer lateral and main lines. In order to provide prospective bidders with a biddable estimate of “on-call” services for the year, staff provided “estimated quantities” of various items of work needed over the year to establish “per unit” costs for each work item. For example, the prospective bidder was asked to provide a per-unit cost for the removal and replacement of a 6-inch sewer main spot repair (up to 6 feet in length).
Determination of the lowest responsive and responsible bidder was based on the total bid for the estimated quantities. Actual work will be outlined on work orders issued to the contractor, as needed, with a limited window for repair. Any individual task will be limited to emergencies and/or situations where the total cost of the project is less than $75,000. The contractor would then be paid as each work order is completed based on the unit prices. The last competitively bid On-Call Citywide Sewer Lateral Replacement & Sewer Main Spot Repair contract was similar in that it was for one year with a renewable option for up to three additional years upon mutual agreement of the
City Council Agenda Report
Agenda Item No. 4.f
August 11, 2026
contractor and the City. The last contract was awarded in June 2023, and two one-year extensions were used, concluding the contract at the end of June 2026.
Procurement Process
The project was advertised for construction bids as required by state law and City policy. Bids were opened on July 16, 2026. Four bids were received in the amount ranging from $293,500 to $363,960 as shown on the Bid Summary (Attachment 1). The lowest responsive bid was received from FJ&I Engineering Inc. of San Pablo, CA. A summary of the lowest bids is as follows:
BID
SCHEDULE
FJ&I
Engineering
Inc.
MBR Plumbing HP
Construction
Kerex
Engineering
Total Bid $293,500 $323,100 $333,200 $363,960
The basis of award for this project is the Total Bid, and there are no additive bids. FJ&I Engineering Inc. was the low bidder and submitted a responsive and responsible bid.
FJ&I Engineering Inc. has an appropriate and valid contractor’s license and satisfactory work references.
The on-call contract will be limited to a not-to-exceed amount of $350,000 per year to perform work as assigned by Public Works on a work order basis. This not-to-exceed amount is not a guarantee of work. The awarded on-call contract will lock in FJ&I Engineering Inc.’s unit prices for the one-year contract and for the three possible additional years of the contract.
Financial Impact
The award of the on-call construction contract does not directly appropriate or expend funds. Funding for each work order would need to be in place prior to issuance of the work order and will be provided from existing capital or operating budget allocations.
The on-call construction contract award limits the maximum annual cumulative value of work performed through all assigned work orders up to $350,000 per year.
Environmental Determination
Pursuant to California Environmental Quality Act (CEQA) of 1970, Public Resources Code Section 21000, et. seq., as amended and implementing State CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations (collectively “CEQA”), the award of the contract does not constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Regs. Sections 15060(c), 15378, as it has no potential for resulting in a direct or reasonably foreseeable indirect physical change in the environment. Even if Council action on this item did constitute a project under CEQA, it falls within the “common sense” exemption set forth in 14 Cal. Code Regs. Section 15061(b)(3), excluding projects where “it can be seen with certainty that
City Council Agenda Report
Agenda Item No. 4.f
August 11, 2026
there is no possibility that the activity in question may have a significant effect on the environment.”
In the alternative, Council action on this item is exempt under CEQA Guidelines Sections 15301 – Existing Facilities, 15302 – Replacement and Reconstruction, and 15304 – Minor Alterations to Land, as it involves pavement rehabilitation, striping, and concrete work. No unusual circumstances exist and none of the exceptions under CEQA Guidelines Section 15300.2 applies. Accordingly, no further environmental review is warranted. This determination reflects the City’s independent judgement and analysis.
Public Contact
The City Council Agenda was posted.
Attachments
1. Bid Summary
2. On-Call Construction Contract with FJ&I Engineering Inc.
PROJECT #2244
City of Concord
Bid Sheet
On-Call Citywide Sewer Lateral
Replacement & Sewer Main Spot Repair
Garden Conf ere nee Room
Engineer's Estimate: $350,000
COMPANY
F J&r Engineering Inc.
1981 21st Street
San Pablo, CA 94806
DIR: 1000714107
MBR Plumbing LLC dba Flowing Water
5915 Pacheco Blvd
Pacheco, CA 94553
DIR: I 001125629
HP Construction Services, Inc.
9000 Crow Canyon Rd
Danville, CA 94506
DIR: I 000455 I 09
Kerex Engit'leering
P.O. Box 23831
Pleasant Hill, CA 94523
DIR: 1000033698
Contact: Justine ext. 3284
Bid Opening:
Thursday,
July 16, 2026
2:00 p.m.
To be awarded:
TOTAL BLD
$293,500.00
$323, I 00.00
$333,200.00
$363,960.00
Attachment 1
On-Call Citywide Sewer 2026 Form CONTRACT
Project 2244 Page 23
Contract
This public works contract (“Contract”) is entered into by and between City of Concord (“City”) and _______________________________________ (“Contractor”), for work on the On-Call Citywide Sewer Lateral Replacement & Sewer Main Spot Repair Project (“Project”).
The parties agree as follows:
1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On _____________, 20___, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below.
City has elected to include the following bid alternate(s) in the Contract: No alternates.
2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all Contract Documents, including this Contract.
2.1 Notice Inviting Bids;
2.2 Instructions to Bidders;
2.3 Addenda, if any;
2.4 Bid Proposal and attachments thereto;
2.5 Contract;
2.6 Payment and Performance Bonds;
2.7 General Conditions;
2.8 Special Conditions;
2.9 Project Plans and Specifications;
2.10 Change Orders, if any;
2.11 Notice of Potential Award;
2.12 Notice to Proceed; and
2.13 The following: No other documents.
3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents.
4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor up to a not-to-exceed amount of _________________ (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.
5. Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, within 20 working days from the start date set forth in the Notice to Proceed (“Contract Time”) for each Work Order. By signing below, Contractor expressly waives any claim for delayed early completion.
6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated FJ&I Engineering Inc.
August 11 26
$350,000 annually
Attachment 2
On-Call Citywide Sewer 2026 Form CONTRACT
Project 2244 Page 24
damages in the amount of $1,290 per day for each day of unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract.
7. Labor Code Compliance.
7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.
7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.
7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”
9. Conflicts of Interest. Contractor, its employees, Subcontractors, and agents may not have, maintain, or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract.
10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City.
11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated, and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows:
City:
On-Call Sewer Lateral Replacement & Sewer Main Spot Repair (PJ 2244) 1950 Parkside Drive M/S 40
Concord, CA 94519
Attn: Justine Gee, Associate Civil Engineer
[email protected]
On-Call Citywide Sewer 2026 Form CONTRACT
Project 2244 Page 25
Contractor:
Name:_____________________________________
Address:___________________________________
City/State/Zip:_______________________________
Phone:_____________________________________
Attn:_______________________________________
Email:______________________________________
Copy to:____________________________________
12. General Provisions.
12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns.
12.2 Third Party Beneficiaries. There are no intended third party beneficiaries to this Contract.
12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Contra Costa County Superior Court, and no other place.
Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Contra Costa County, California.
12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.
12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor.
12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.
12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code § 313. [Signatures are on the following page.]
1981 21st Street
510-650-2655
San Pablo, CA 94806
FJ&I Engineering Inc.
Marco Avila
[email protected]
On-Call Citywide Sewer 2026 Form CONTRACT
Project 2244 Page 26
The parties agree to this Contract as witnessed by the signatures below:
CITY: Approved as to form:
s/_______________________________ s/__________________________________ ________________________________ ___________________________________ Name, Title Name, Title
Date: ___________________________ Date: ______________________________
Attest:
s/_______________________________
_________________________________
Name, Title
Date: ___________________________
CONTRACTOR: ___________________________________________________ Business Name
s/_______________________________ Seal:
_________________________________
Name, Title
Date: ____________________________
Second Signature (See Section 12.8):
s/_______________________________
_________________________________
Name, Title
Date: ____________________________
___________________________________________________
Contractor’s California License Number(s) and Expiration Date(s) Jerome C. Wilverding, City Manager Susanne Brown, City Attorney Joelle Fockler, MMC, City Clerk
FJ&I Engineering Inc.
CSLB #1040314, Exp. 6/30/2028
Marco Avila, Treasurer/GM
On-Call Citywide Sewer 2026 Form CONTRACT
Project 2244 Page 27
FINANCE DIRECTOR'S CERTIFICATION:
Concord, California
Date:
I HEREBY CERTIFY THAT ADEQUATE FUNDS EXIST OR WILL BE RECEIVED DURING THE CURRENT FISCAL YEAR 2026-2027 TO PAY THE ANTICIPATED EXPENSES TO BE INCURRED PURSUANT TO THIS CONTRACT.
THE SUM OF $ Account Code .
Finance Director's Signature
END OF CONTRACT
350,000.00 710-2244-115-74200
Staff Report
Date: August 11, 2026
To: City Council
From: Jasmin Loi, Director of Human Resources
Prepared by: Mark Love, Human Resources Manager
[email protected]
(925) 671-3397
Subject: Considering the following actions to recruit and retain qualified employees:
1. Adopting a Resolution approving the negotiated terms and authorizing the City Manager to execute a three-year
memorandum of understanding between the City of
Concord and the Office and Professional Employees
International Union Local 29 for the period of July 1, 2026, through June 30, 2029, and authorizing budget
appropriations of $81,052 in Fiscal Year 2026-27; and
2. Adopting a Resolution approving the City of Concord’s Salary Schedule effective August 3, 2026, in accordance with the California Public Employees’ Retirement System (CalPERS) for a publicly available pay schedule. (General Fund)
CEQA: Not a project/exempt pursuant to Public Resources Code Section 21065, California Code of Regulations Title 14 Sections 15016(b)(2), 15061(b)(3), 15273, and/or 15378(b)(4).
Report in Brief
The memorandum of understanding between the City of Concord and the Office and Professional Employees International Union Local 29 (“OPEIU Local 29”) expired on June 30, 2026. Over the past several months, City of Concord negotiators and OPEIU Local 29 representatives bargained in good faith regarding a successor memorandum of understanding. The parties reached a tentative agreement and the Union ratified its contract on July 24, 2026.
4.g
City Council Agenda Report
Agenda Item No. 4.g
August 11, 2026
Recommended Action
1. Adopt a Resolution approving the negotiated terms and authorizing the City Manager to execute a three-year memorandum of understanding between the City of Concord and OPEIU Local 29 for the period of July 1, 2026, through June 30, 2029, and authorizing budget appropriations of $81,052 in Fiscal Year 2026-27.
2. Adopt a Resolution approving the City of Concord’s salary schedule effective August 3, 2026, in accordance with the requirements of the California Public Employees’ Retirement System (CalPERS) for a publicly available pay schedule.
Background
The terms of the current memoranda of understanding between the City of Concord and Local 29 expired on June 30, 2026. Over the course of several months, Local 29 and the City bargained in good faith to address employee wages, healthcare cost increases, and operational updates. The parties reached a tentative agreement and the Union ratified its contract on July 24, 2026.
Additionally, the California Code of Regulations (CCR) requires Council to adopt the City’s salary schedule at a public meeting (2 CCR § 570.5). This obligation arises whenever salary ranges/steps are changed to ensure that salary rates are transparent and publicly available. These publicly adopted rates are used by the California Public Retirement System to determine the appropriate compensation earnable for each City employee when calculating their pension benefit.
Analysis
The noteworthy modifications to the memorandum of understanding for Local 29 are outlined below:
1. Wage Increases
a. Effective August 3, 2026, the base salary for all bargaining unit classifications will be increased by three percent (3%). b. Effective the first full pay period of July 2027, the base salary for all bargaining unit classifications will be increased by three percent (3%). c. Effective the first full pay period of July 2028, the base salary for all bargaining unit classifications will be increased by three percent (3%).
2. Medical Benefits and Cost Increases
a. Starting January 1, 2027, the City will pay for the first 5% of any annual healthcare premium increases. This provision sunsets on June 30, 2029. b. Cost Sharing: Any premium increase above 5% will be split using the current 75% City / 25% employee cost-sharing ratio.
City Council Agenda Report
Agenda Item No. 4.g
August 11, 2026
3. Within ninety days from City Council Approval of this MOU, either party may request to meet and confer on the limited topic of compensation for after-hours electronic/remote work by union members in the IT classifications of senior system analyst and senior programmer analyst.
By absorbing the first 5% of healthcare premium increases and maintaining the 75/25 ratio on the remainder through June 2029, this temporary three-year cost-sharing adjustment on health insurance premiums proactively mitigates the impact of rising healthcare inflation on this specific employee group. This adjustment will only be made for the next three years, after which all cost increases revert to the 75/25 ratio. This approach fosters workforce stability, supports talent retention, and promotes long-term equity among all City classifications represented by OPEIU Local 29.
Financial Impact
The total cost of the compensation adjustments is $1.43 million for the OPEIU Local 29 over all three MOU years, Fiscal Years 2026-27, 2027-2028, and 2028-29.
FY 2026-27 budget appropriations of $81,052 for OPEIU Local 29 are necessary to cover the costs of implementation of the negotiated MOUs. Funds are available in the adopted FY 2026-27 Operating Budget. Costs for FYs 2027-28 and 2028-29 will be incorporated into the next biennial budget.
Environmental Determination
City Council action herein is exempt from California Environmental Quality Act (CEQA) review because none of the activities addressed herein constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Regs. Section 15060(c)(2), 15060(c)(3), and/or 15378 because none of the activities has the potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, all of the activities are statutorily exempt pursuant to CEQA Guidelines Section 15273 because they involve government funding/fiscal activities, and, even if any activity was a project under California Environmental Quality Act (CEQA), each is exempt under 14 Cal. Code Regs.
Sections 15061(b)(2), 15061(b)(3), and/or 15378(b)(4). This determination reflects the City of Concord’s independent judgment and analysis.
Public Contact
The City Council Agenda was posted.
City Council Agenda Report
Agenda Item No. 4.g
August 11, 2026
Attachments
1. Resolution approving OPEIU Local 29 memorandum of understanding with Exhibit A: Successor memorandum of understanding (July 1, 2026, to June 30, 2029).
2. Resolution approving the City of Concord’s Salary Schedule effective August 3, 2026, with Exhibit A, Salary Schedule.
BEFORE THE CITY COUNCIL OF THE CITY OF CONCORD
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA
A Resolution Approving the Negotiated Terms and
Authorizing the City Manager to Execute a ThreeYear Memorandum of Understanding between the City of Concord and OPEIU Local 29 for the period
July 1, 2026, through June 30, 2029, and Authorizing
Budget Appropriations of $81,052 in Fiscal Year
2026-27
Resolution No. 26-XX
/
WHEREAS, the term of the current memorandum of understanding between the City of Concord and the Office and Professional Employees International Union Local 29 (“OPEIU Local 29”), expired June 30, 2026; and
WHEREAS, over the past several months, City of Concord negotiators and OPEIU Local 29 representatives bargained in good faith regarding a successor memorandum of understanding and reached a tentative agreement and Union ratified its contract on July 24, 2026; and WHEREAS, the attached successor memorandum of understanding between the City of Concord and OPEIU Local 26 contains the terms and conditions of employment for classifications in the Office and Professional Employees International Union Local 29 for the period July 1, 2026 through June 30, 2029 (Exhibit A); and
WHEREAS, the total cost of the comprehensive negotiated changes to the memorandum of understanding over the three-year team (Fiscal Years 2026-27, 2027-28, 2028-29) is approximately $1,430,000; and
WHEREAS, budget appropriations of $81,052 for Fiscal Year 2026-27 are necessary to cover the costs of the implementation of the terms of the successor memorandum of understanding; and WHEREAS, costs for Fiscal Years 2027-28 and 2028-29 will be incorporated into the next biennial budget; and
//
//
//
Attachment 1
WHEREAS, the City Council, after giving all public notices required by state law and the Concord Municipal Code, held a duly noticed public meeting on August 11, 2026, on this item, and, at such public meeting, Council considered the staff report dated August 11, 2026, together with all other relevant oral and written information, testimony, and comment received before deciding on this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CONCORD DOES RESOLVE AS FOLLOWS:
Section 1. City Council action herein is exempt from California Environmental Quality Act (CEQA) review because none of the activities addressed herein constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Regs. Section 15060(c)(2), 15060(c)(3), and/or 15378 because none of the activities has the potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, all of the activities are statutorily exempt pursuant to CEQA Guidelines Section 15273 because they involve government funding/fiscal activities, and, even if any activity was a project under California Environmental Quality Act (CEQA), each is exempt under 14 Cal. Code Regs.
Sections 15061(b)(2), 15061(b)(3), 15273, and/or 15378(b)(4). This determination reflects the City of Concord’s independent judgment and analysis.
Section 2. Approves the attached successor memorandum of understanding between the City of Concord and OPEIU Local 29 for the period of July 1, 2026, through June 30, 2029.
Section 3. Approves a budget appropriation of $81,052 for Fiscal Year 2026-27.
Section 4. Authorizes the City Manager to execute the successor Memorandum of Understanding on behalf of the City of Concord and to execute such documents and take such other steps as might be necessary or desirable to implement the Memorandum of Understanding.
Section 5. This resolution shall become effective immediately upon its passage and adoption. //
//
//
//
PASSED AND ADOPTED by the City Council of the City of Concord on August 11, 2026, by the following vote:
AYES: Councilmembers -
NOES: Councilmembers -
ABSTAIN: Councilmembers -
ABSENT: Councilmembers -
I HEREBY CERTIFY that the foregoing Resolution No. 26-XX was duly and regularly adopted at a regular meeting of the City Council of the City of Concord on August 11, 2026.
Joelle Fockler, MMC
City Clerk
APPROVED AS TO FORM:
Susanne Meyer Brown
City Attorney
Exhibit A: Memorandum of Understanding between the City of Concord and the Office and Professional Employees International Union Local 29 for the period July 1, 2026, through June 30, 2029
MEMORANDUM OF UNDERSTANDING
Between
The City of Concord
and
Office and Professional Employees
International Union (OPEIU), Local 29
Local
AFL-CIO & CLC
July 1, 2026 – June 30, 2029
29 Exhibit A to Attachment 1
Table of Contents
i
SUBJECT PAGE
1. RECOGNITION.................................................................................................................1
1.1. Representation by Employees..................................................................................2
1.2. Establishment of Classification................................................................................2
1.3. Membership..............................................................................................................2
1.4. Union Release ..........................................................................................................3
2. SCOPE OF AGREEMENT...............................................................................................3
3. EMPLOYEE RIGHTS ......................................................................................................3
4. HOURS OF WORK...........................................................................................................3
4.1 Breaks.......................................................................................................................3
4.2 Clean-up...................................................................................................................3
4.3 Meals........................................................................................................................3
4.4 Alternate Work Schedule .........................................................................................4
4.5 Telecommuting Agreement .....................................................................................4
5. PAY......................................................................................................................................4
5.1 Step Increases...........................................................................................................4
5.2 Pay for Higher Class Work.......................................................................................4
5.3 Pay Administration Tables .......................................................................................5
5.4 Registration Differential...........................................................................................5
5.5 Bilingual Pay ............................................................................................................5
5.6 Salary Changes.........................................................................................................5
5.7 Steps/Merit System ..................................................................................................6
6. OVERTIME........................................................................................................................6
6.2 Comp Time Cash Out ..............................................................................................7
6.3 Call Back .................................................................................................................7
6.4 After Hours Electronic/Remote Work .....................................................................7
6.5 Limited Reopener ....................................................................................................8
7. HOLIDAYS ........................................................................................................................8
8. VACATIONS......................................................................................................................8
Table of Contents
ii
9. REDUCTIONS IN FORCE/LOSS OF EMPLOYMENT STATUS..............................9
9.1 Layoff and Reemployment......................................................................................9
9.2 Loss of Employment Status....................................................................................9
10. LEAVES OF ABSENCE.................................................................................................10
10.1 Sick Leave..............................................................................................................10
10.2 Bereavement Leave................................................................................................11
10.3 Family Care Leave .................................................................................................12
10.4 Catastrophic Leave.................................................................................................12
11. JURY DUTY.....................................................................................................................12
12. NON DISCRIMINATION...............................................................................................12
13. DISCIPLINE PROCEDURE ..........................................................................................12
13.1 Cause of Disciplinary Action.................................................................................12
13.2 Extent of Disciplinary Actions...............................................................................14
13.3 Authority for Disciplinary Actions.........................................................................15
13.4 Notice to Employees ..............................................................................................16
13.5 Employee Response ...............................................................................................16
13.6 Order of Disciplinary Action..................................................................................16
13.7 Effective Date.........................................................................................................17
13.8 Right of Appeal......................................................................................................17
13.9 Employee Representative .......................................................................................17
13.10 Appeal Procedure ...................................................................................................17
13.11 Waiver of Steps or Time Limits.............................................................................19
13.12 No Interruption of Work ........................................................................................19
14. GRIEVANCE PROCEDURE.........................................................................................19
14.1 Definition ...............................................................................................................19
14.2 Employee Representative .......................................................................................20
14.3 Class Actions .........................................................................................................20
14.4 Parties’ Intent .........................................................................................................20
14.5 Procedure................................................................................................................20
14.6 Waiver of Steps or Time Limits ............................................................................22
Table of Contents
iii
14.7 No Interruption of Work........................................................................................22
15. SAFETY AND HEALTH...............................................................................................22
15.1 Safety .....................................................................................................................22
15.2 Wellness Program ..................................................................................................23
15.3 Drug and Alcohol Use and Testing ........................................................................23
16. BENEFIT PLANS ............................................................................................................24
16.1 Medical...................................................................................................................24
16.2 Dental.....................................................................................................................31
16.3 Long Term Disability .............................................................................................32
16.4 Life Insurance.........................................................................................................32
16.5 Retirement..............................................................................................................32
16.6 Deferred Compensation..........................................................................................32
16.7 Employee Assistance..............................................................................................33
16.8 Tuition Reimbursement..........................................................................................33
16.9 Retirement Award Package....................................................................................33
17. ENTIRE AGREEMENT .................................................................................................33
17.2 Severability.............................................................................................................34
18. REVISIONS, AMENDMENTS, EXTENSIONS...........................................................34
19. PAPERLESS PAYROLL................................................................................................34
20. TERM OF AGREEMENT..............................................................................................34 Attachment A: Pay Table Professional Unit .................................................................................i Attachment B: Retirement Award Package .................................................................................vi Attachment C: Educational Incentive Program .........................................................................vii Educational Incentive Program Request Form...........................................................................xii Attachment D: Side Letters........................................................................................................xiii Signatures.................................................................................................................................xviii
This Memorandum of Understanding (MOU) made and entered into effective the first day of July 2023, by and between the City of Concord (hereafter referred to as “City” or “Employer”) and the Office and Professional Employees International Union (OPEIU) Local 29 (hereafter referred to as “Local 29,” or “Unit” as appropriate).
1. RECOGNITION
The City recognizes the OPEIU Local 29 (“Local 29” or “Union”) formerly known as the Concord Associated Professional Employees or “CAPE” as the Certified Employee Organization for the Professional Representation Unit.
This MOU entered into between the Union and the City represents the result of meeting and conferring in good faith in accordance with Section 3505 of the California Government Code.
The adjustments to wages, hours and conditions of employment that are set forth in this MOU have been discussed in good faith between the parties hereto. The members of the Professional Employees, have ratified the terms and conditions in the MOU, and the staff representatives of the City agree to recommend to the City Council that all the adjustments set forth herein be adopted in full by the City Council in the manner and procedure prescribed by law. Unless otherwise noted herein, changes to wages, hours, and conditions of employment are prospective following City Council approval of the MOU.
The section headings in this MOU are for convenience only and are not to be construed as modifying or governing the language in the section referred to.
As used in this MOU, the term “Employee(s)” refers to full time competitive service members of the Unit. The Professional Representation Unit is comprised of employees in the classifications set forth in Exhibit A hereto.
MEMORANDUM OF UNDERSTANDING
Between
The City of Concord
and
Office and Professional Employees
International Union
(OPEIU) Local 29
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
1.1 Representation by Employees
For purposes of meeting and conferring in good faith regarding wages, hours, and working conditions with the Professional Employees, the City, upon 24-hour notice, will provide time off with pay to no more than three City employee members during their normal work hours. Meetings held outside of the employee's normal work hours shall be on the employee's own time.
1.2 Establishment of Classification
When the City establishes a new classification, the City shall notify Local 29 of its intention to establish the new classification and the unit placement of the classification.
Notice under this provision will be accomplished by e-mailing Local 29 a copy of or link to the agenda packet for the meeting at which the City Council is scheduled to establish of the new classification.
OPEIU may request that the Human Resources Director meet to discuss the unit placement of the new classification. Such request shall be in writing and must be made prior to the Council meeting at which the unit placement is to be determined. Except as provided in the City’s Classification Plan, the decision of the Human Resources Director shall be final.
1.3 Membership
1.3.1 Purpose
The parties mutually understand and agree that under the Meyers-Milias- Brown Act (Government Code section 3500 et seq.), all employees represented by Local 29, have the right to join or not join the Union.
1.3.2 Union Dues
(a) Upon written notice from the Union that dues deduction has been authorized by the employee, membership dues will be automatically deducted from an employee’s pay and forwarded by the City to the Union. Dues deductions begin the beginning of the pay period following the City’s receipt of notice from the Union.
(b) The employee’s earnings must be sufficient after the other legal and required deductions are made to cover the amount of the dues authorized. When an employee is in a non-pay status for an entire pay period, no withholding will be made to cover the pay period from future earnings. In the case of an employee in a non-pay status only during part of the pay period, whose salary is not sufficient to cover the full withholding, no deduction shall be made. In the case of an employee who is receiving catastrophic leave benefits during a pay period, no deduction shall be made. In this connection, all other legal and required deductions (including health care and insurance deductions) have priority over Union dues.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
(c) The provisions of the above shall not apply during periods that an employee is separated from the representation unit, but shall be reinstated upon the return of the employee to the representation unit. For the purpose of this section, the term separation includes transfer out of the representation unit, layoff, and leave of absence without pay.
1.3.3 New employee orientation and membership information is attached as Attachment D
1.3.4 Indemnification
The Union agrees to hold harmless, indemnify and defend the City and its officers, employees and agents against any and all claims, proceedings and liability arising, directly or indirectly, out of any actions taken or not taken by or on behalf of the City under this Section.
1.4 Union Release
The City agrees to pay up to eight (8) hours biannually for a maximum of two (2) stewards to attend stewards’ council meetings, training, and other union-sponsored meetings. Requests for time off pursuant to this article shall be made at least two (2) weeks in advance, except by mutual agreement.
2. SCOPE OF AGREEMENT
This MOU applies to all classifications assigned to Local 29 by the Personnel Board pursuant to Policy and Procedure No. 37.34, Section 4.
3. EMPLOYEE RIGHTS
3.1 The Parties hereby incorporate by reference Policy and Procedure No. 37.34, Section 3, in effect on the date of this MOU. Changes to any Policy and Procedure referenced in this MOU will become effective only after satisfying the City’s meet and confer obligations.
4. HOURS OF WORK
4.1 Breaks
There shall be provided one 15-minute relief break within each 4-hour work period, with no travel time permitted to go to some other site for the break. Relief break time may not be accumulated, and, if not taken, shall be lost.
4.2 Clean-up
There shall be provided, if necessary, five minutes cleanup time prior to the meal period and also at the end of the employee's workday.
4.3 Meals
All City vehicles involved in field crew operations will not leave the field job site
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
during the meal period and employees are not to be provided travel time to return to yard or other locations for meals. The City will provide waterless soap and towels for those at work in the field.
4.4 Alternate Work Schedule
By mutual agreement between the Department Head and employee, subject to approval of the City Manager and side letter signed by the Union, the parties may agree to an alternate work schedule. Any agreement will be subject to a thirty (30) day termination notice by either party. The City will provide at least two weeks’ notice to return from regularly scheduled telecommuting, whenever possible. The City reserves the right to require an employee to return with less than 2-weeks’ notice in cases such as emergencies or a significant unexpected operational need as determined by the City.
4.5 Telecommuting Agreement
By mutual agreement between the Department Head and the employee, subject to approval of the City Manager and side letter signed by the Union, the parties may agree to a Telecommuting Agreement. Any agreement will be subject to a thirty (30) day termination notice by either party. (See Administrative Directive No. 162, section K, and Administrative Directive No. 118.)
5. PAY
5.1 Step Increases
The Parties hereby incorporate by reference Policy and Procedure No. 37.7 Employment Status – Pay Plan, Section 3.4, in effect on the date of this MOU.
Changes to Policy and Procedure No. 37.7, Section 3.4 will become effective only after satisfying the City’s meet and confer obligations.
5.2 Pay for Higher Class Work
The Parties hereby incorporate by reference Policy and Procedure No. 37.6 Classification Plan, in effect on the date of this MOU. Changes to Policy and Procedure No. 37.6 will become effective only after satisfying the City’s meet and confer obligations.
The City will continue its practice of budgeting and paying all employee costs related to training and fees associated with required professional certification as specified in the respective job classifications.
5.2.1 Working Out of Class
5.2.1.1 Definition. Employees who are temporarily assigned by the City Manager, or designee, to perform a substantial amount of additional work customarily assigned to a higher classification.
5.2.1.2 Pay Differential. The salary increase received by an employee
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
when working out-of-class will be determined by the City Manager based on the range of duties assigned. However, the standard increase will be five percent (5%). Once the Out-ofClass assignment ends, the pay differential shall be terminated.
Termination of the pay differential is not discipline and the disciplinary appeal process does not apply under these
circumstances.
5.2.1.3 Duration. Out-of-Class assignments must not extend past six (6) months except through written authorization of the City Manager, or designee.
5.2.1.4 The parties agree that to the extent permitted by law, the City shall report this pay to CalPERS as special compensation for Classic members only (as that term is defined by CalPERS) under 2 CCR 571(a)(3) – Temporary Upgrade Pay.
5.3 Pay Administration Tables
5.3.1 Pay Table Professional Unit - Table of Pay Grades and Hourly Rate Ranges as of the first full pay period following ratification and approval of the MOU is found at Attachment A
5.3.2 Any class that is placed in a salary rate higher than its assigned pay grade shall carry the class's assigned pay grade designation as recommended by that study, coded by the letter "M" indicating a special rate authorized due to competitive rates found in the market place, or for whatever reason agreed upon as a result of the meet and confer process.
5.4 Registration Differential
The registration differential for Junior Civil Engineers and for Assistant Civil Engineers who have received registration from the Board of Registration for Professional Engineers of the California Department of Consumer Affairs shall be non-cumulative 5% of each step within the pay range. The amount of this registration differential shall be included in base pay and subject to related fringe benefits.
5.5 Bilingual Pay
The City will pay a $150 per month bilingual premium to City-designated employees who have been certified as fluent in a language that meets the City’s operational needs The parties agree that to the extent permitted by law, the City shall report this pay to CalPERS as special compensation under Title 2 CCR, Sections 571(a)(4) and 571.1(b)(3) as Bilingual Premium.
5.6 Salary Changes
Effective the first full pay period after Council approval of this MOU or the first full pay
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
period of July 2026, whichever is later, bargaining unit members shall receive a three percent (3%) wage increase.
Effective the first full pay period after July 1, 2027, bargaining unit members shall receive a three percent (3%) wage increase.
Effective the first full pay period after July 1, 2028, all bargaining unit members shall receive a three percent (3%) wage increase.
5.7. Steps/Merit System
Effective October 1, 2013, Local 29 members began participation in the Results Based Performance Management System for salary step increase eligibility.
Normally, and as a general rule, upon employment, reemployment, rehire, and upon progress and productivity, employees shall be considered for initial placements and subsequent step advancement according to Policy & Procedure 37.7 Employment Status – Pay Plan.
An employee who receives an overall “Not Fully Achieves Expectations” will not be considered for any merit or length of service step advancement until an overall “Achieves Expectations” rating is established. Where an employee receives an overall rating of “Not Fully Achieves Expectations” on two consecutive occasions, disciplinary action may be taken by the appointing authority as provided in Section 13.
An employee who receives an overall “Not Fully Achieves Expectations” and does not receive a step increase may appeal this decision to his or her Department Head. If the employee is not satisfied with the outcome of the decision he/she may request a meeting with the City Manager. The City Manager will meet with the employee to discuss the evaluation. The employee may be accompanied by their union representative. The decision of the City Manager will be final.
6. OVERTIME
6.1 The Parties hereby incorporate by reference Policy and Procedure No. 37.14, Overtime, in effect on the date of this MOU. In the event of any conflict between this MOU and Policy and Procedure No. 37.14, Overtime, the terms of this MOU shall prevail. All classifications covered by this MOU shall be assigned to Overtime Group A.
Overtime hours are defined as hours worked, including all authorized paid leave hours, in excess of forty (40) per week. All overtime work must be authorized and approved in advance by the Department Head or designee. Employees shall not perform overtime work without such prior approval except in emergency situations where immediate action is necessary to protect life, safety, property, or the continuity of essential public services.
Employees shall be granted either time off equivalent to one and one-half times the overtime hours worked, or cash compensation equivalent to one and one-half times their straight time rate of pay for the overtime hours worked. Employees entitled to overtime may accumulate up to a maximum of one hundred and sixty (160) hours compensatory
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
time off with pay. The City shall balance accounts twice annually in April and October.
6.2 Comp Time Cash Out
An employee may request up to forty (40) hours of Compensatory Time earned (Comp Time) to be paid in cash in accordance with the following provisions:
6.2.1 During the periods April 15 through April 30 and October 15 through October 30, the employee may elect to receive cash for up to forty (40) hours’ worth of Comp Time earned.
6.2.2 Payment of the cash in lieu of Comp Time off shall be made no later than the last payday occurring in the following month.
6.2.3 Payment of cash in lieu of time off shall not exceed the employee’s Comp Time balance on hand at the time of the payment.
6.3 Call Back
Employees called back to work after the conclusion of their regular workday or called into work on the scheduled day off, including scheduled off observed holidays, shall be paid a minimum of two (2) hours of overtime or receive Comp Time. Court appearances related to official duties are also subject to the same minimum compensation.
Call back includes (1) an employee’s return to work upon the City’s request after the conclusion of the employee’s normal work shift, provided the employee has left the worksite to return home or to personal activities off-site; (2) employees called into work on their regular scheduled day off, including scheduled off observed holidays. Call Back does not include scheduled requests that an employee report to work prior to the commencement of the employee’s regular work shift.
As used here, “called back to work" means required to physically return to the worksite.
When a court appearance, which has been scheduled to occur on the employee’s time off, is cancelled and less than six (6) hours’ notice of the cancellation is given, the employee shall be paid two (2) hours of overtime. Personal contact or a message left on the employee’s department voice mail is considered adequate notice.
6.4 After Hours Electronic / Remote Work
After hours work performed remotely, from home, or through electronic means, including but not limited to telephone calls, electronic mail, text messages, remote computer access, video conferencing, or other similar communications, shall not constitute a call back and shall not qualify for the minimum two (2) hour call back guarantee.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
Employees who perform authorized work remotely or electronically outside their regular work schedule shall be compensated for the greater of fifteen (15) minutes (one quarter of an hour) or actual time worked in accordance with the overtime provisions of this Agreement and applicable law.
6.5 Limited Reopener
Within ninety days from City Council approval of this MOU, either party may request to meet and confer on the limited topic of compensation for after-hours electronic/remote work by union members in the IT classifications of senior systems analyst and senior programmer analyst.
7. HOLIDAYS
The following shall be provided as holidays for purposes of wages and hours of work for eligible full time employees:
Observed
New Year’s Day ..............................................................January 1st Martin Luther King Jr. Day ...........................................Third Monday in January Washington's Birthday.................................................Third Monday in February Memorial Day..................................................................Last Monday in May Independence Day...........................................................July 4th Labor Day.........................................................................First Monday in September Veteran's Day...................................................................November 11th Thanksgiving Day...........................................................As Proclaimed by the President Day Following Thanksgiving ....................................As Proclaimed by the President Christmas Eve ............................................................December 24th Christmas Day .................................................................December 25th
7.1 In addition, the City will credit each full-time employee’s compensatory time bank with an additional three (3) hours of straight time leave in the first pay period in March.
8. VACATIONS
8.1 Except as provided immediately below, the Parties hereby incorporate by reference Policy and Procedure No. 37.17 in effect on the date of this MOU. Provided, however, that the maximum vacation balance available for an employee at any one time shall be the amount of the employee's vacation accrual for the previous anniversary year plus the amount of the vacation accrual for the current anniversary year. However, upon approval of the Department Head, up to 40 additional days of vacation may be accumulated for a period
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
not to exceed one anniversary year. Changes to Policy and Procedure No. 37.17 will become effective only after satisfying the City’s meet and confer obligations.
8.1.1 Annual Vacation Cash-Out. For the purposes of reducing excess vacation accrual, employees may elect to receive compensation (“cash-out”), annually, for a maximum of 40 hours of accrued vacation each year, so long as two workweeks of accrued vacation remain for the benefit of the employee after the cash-out is taken. This election must be made in writing no later than December 31 of the calendar year prior to when the cash-out is scheduled to occur. By way of illustration, employees seeking a cash-out in calendar year 2016 must submit their cash-out election by December 31, 2015. This compensation shall occur on the first full pay period in August following submission of the irrevocable election form (which will be made available in the Human Resources Department). No exceptions will be made to this policy. If the non-revocable election is not made by December 31, there will be no other opportunity to cash-out vacation accruals until/unless the nonrevocable election is made by the employee on or before December 31 of the following year.
8.1.2 On September 9 of each calendar year, employees in pay status shall accrue an additional eight (8) hours of vacation in lieu of an Admissions Day holiday.
Such vacation accrual shall occur at the end of the pay period which includes September 9 and shall be credited to the employee's vacation balance regardless of the number of hours paid during the pay period. However, such vacation accrual shall not be credited in any amount that exceeds the employee's vacation accrual maximum unless specifically authorized by, and at the sole discretion of, the City Manager after considering alternatives that may be available. The City agrees to provide advance notification to those employees who may, as a result of such crediting, exceed their vacation maximum so that they may schedule vacation time or initiate other appropriate action in order to avoid a loss. Such notification shall be with the understanding that it is the employee's responsibility to initiate the appropriate request. For purposes of this section, pay status means the employee has worked or is on authorized paid leave of absence for at least four hours on the workday prior to and following the holiday. Employees on authorized or unauthorized leaves of absence without pay are not considered to be in pay status during the leave of absence.
9. REDUCTIONS IN FORCE/LOSS OF EMPLOYMENT STATUS
9.1 Layoff and Reemployment
The Parties hereby incorporate by reference Policy & Procedure No. 37.33 Layoff, Displacement, Re-employment in effect on the date of this MOU. Changes to Policy & Procedure No. 37.33 will become effective only after satisfying the City’s meet and confer obligations.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
Layoffs shall proceed consistent with the terms of existing City policy. However, in the event layoffs are required, the City will provide up to thirty (30) calendar days’ notice to affected bargaining unit employees. If the City determines it is appropriate to give less than thirty (30) calendar days’ notice, it will pay the employee the difference between the notice period and the thirty calendar days. For example, if the City gives an employee ten (10) days’ notice of layoff, the City will pay the employee his or her normal pay for the period between the tenth and thirtieth day.
9.2 Loss of Employment Status
The Parties hereby incorporate by reference Policy & Procedure No. 37.7 Employment Status – Pay Plan, Section 2.3.6, and Policy & Procedure No. 37.20 Personal Leave, Section 3.8 in effect on the date of this MOU. Changes to Policy & Procedure No. 37.7, Section 2.3.6, and Policy & Procedure No. 37.20, Section 3.8 will become effective only after satisfying the City’s meet and confer obligations.
10. LEAVES OF ABSENCE
10.1 Sick Leave
The Parties hereby incorporate by reference Policy and Procedure No. 41, in effect on the date of this MOU, subject to the changes described below. Changes to Policy and Procedure No. 41, other than those to incorporate the exceptions below, will become effective only after satisfying the City’s meet and confer obligations.
10.1.1 The accrual of sick leave for an eligible employee (an employee in the Competitive Service or those in Appointive Positions) shall be at the rate of 3.692 hours credited at the end of each full bi-weekly pay period during which such an employee receives 56 hours straight time pay. No sick leave credit shall accrue to an eligible employee who receives less than 56 hours straight time pay for the bi-weekly pay period. Such straight time pay may consist of pay for regular hours worked or pay for approved vacation, sick leave, or compensatory time off.
10.1.2 Upon retirement, or termination when eligible for retirement, unused accrued sick leave can be used to extend service credit and an employee will receive 0.004 years of service credit for each 8 hours of unused accrued sick leave. Alternatively, an employee can elect to cash out up to 800 hours of unused accrued sick leave at the rate of two hours of pay for each 8 hours of unused accrued sick leave. An employee can also elect a combination of cash out up to the maximum 800 hours (200 hours pay) and extended service for the balance.
10.1.3 For an eligible full-time employee, sick leave shall be available as it accrues at the end of each pay period following date of eligible employment.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
10.1.4 In the event of the death of a parent-in-law, grandparents of employee or spouse, the employee's sick leave benefit may be used in the same manner as applies to the employee's "immediate family" under provisions of Policy & Procedure No. 41, titled "SICK LEAVE".
10.1.5 In the case of the employee's illness due to pregnancy, sick leave shall apply to those periods when the employee is expected to return to work during the term of the pregnancy. If the employee is ordered to cease work by her physician due to pregnancy, the employee should be allowed to use any available sick leave, vacation, or compensatory time, and authorized leave of absence without pay during the period commencing with the cessation of work to the date released to return to work by the attending physician. An extension of paid absence beyond this period through the use of available vacation and comp time is at the discretion of the appointing authority. An extension of authorized leave of absence without pay shall be in accordance with Policy & Procedure No. 77 Family and Medical Leave.
10.1.6 Not more than one hundred and twenty (120) hours of sick leave within any calendar year may be granted to an employee for the care or attendance upon the members of the employee's immediate family.
10.1.7 Use of Sick Leave. An eligible employee can only be granted sick leave with pay upon recommendation of the appointing authority for the following:
10.1.7.1 In the case of a bona fide illness of the employee.
10.1.7.2 In the event of the serious illness a member of the employee’s immediate family.
Immediate Family means an employee's: spouse;
biological, adoptive or foster parent (including a stepparent, or legal guardian of an employee or the employee’s spouse or registered domestic partner, or a
person who stood in loco parentis when the employee
was a minor child); child (defined to include a biological or legally adopted child, a foster child, a step-child, legal ward, or a child to whom the employee stands in loco
parentis. This definition of child is applicable regardless of age or dependency status.); registered domestic
partner; parent-in-law; sibling; grandchild; grandparent; designated person, which is defined as any individual
related by blood or whose association with the employee is the equivalent of a family relationship (the employee may identify one designated person per 12-month period
at the time they request the leave); or any or either of
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
them.
10.1.7.3 In the event of a scheduled medical or dental appointment for the eligible employee, the employee’s spouse, the employee’s registered domestic partner, or the employee’s dependent children that requires the employee’s absence from work.
10.2 Bereavement Leave
10.2.1 Paid Bereavement Leave
An employee will be entitled to a maximum of five (5) paid days of bereavement leave due to the death of an employee’s family member. For purposes of this section, the term “family member” means spouse or a child, child-in-law, parent, parent-in-law, sibling, grandparent, grandchild, grandchild-in-law, or domestic partner as defined by California Government Code 12945.2.
10.2.2 Other Conditions
Days of bereavement leave need not be consecutive but shall be completed within three months of the date of death of the family member.
If requested by the City, the employee, within thirty (30) days of the first day of leave, shall provide documentation of the death of the family member. As used in this section, “documentation” includes, but is not limited to, a death certificate, a published obituary, or written verification of death, burial, or memorial services from a mortuary, funeral home, burial society, crematorium, religious institution, or governmental agency.
10.3 Family Care Leave
The parties hereby incorporate by reference Policy and Procedure No. 77, in effect on the date of this MOU. Changes to Policy and Procedure No. 77 will become effective only after satisfying the City’s meet and confer obligations.
10.4 Catastrophic Leave
The parties hereby incorporate by reference Administrative Directive No. 157, in effect on the date of this MOU. Changes to Administrative Directive No. 157 will become effective only after satisfying the City’s meet and confer obligations.
11. JURY DUTY
The parties hereby incorporate by reference Policy and Procedure No. 47, in effect on the date of this MOU. Changes to Policy and Procedure No. 47 will become effective only after satisfying the City’s meet and confer obligations.
12. NON DISCRIMINATION
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
The parties fully subscribe to the City’s policy providing an environment free of unlawful discrimination in its work place, programs, and activities. An employee who engages in impermissible discrimination will be subject to appropriate remedial action, which may include discipline, up to and including termination, depending upon the nature and severity of the discriminatory act.
13. DISCIPLINE PROCEDURE
13.1 Cause of Disciplinary Action
Disciplinary measures may be taken for any good and sufficient cause. Cause for disciplinary action shall include:
13.1.1 Fraud in securing appointment or falsification concerning records, fellow employees, or work performed.
13.1.2 Incompetency or inefficiency.
13.1.3 Inexcusable neglect of duty.
13.1.4 Insubordination.
13.1.5 Willful disobedience.
13.1.6 Endangering self or others, or failure to follow adopted safety practices, or failure to properly use required personal protective gear or equipment.
13.1.7 Being under the influence of alcohol or any controlled substances while on duty; including but not limited to drunkenness on duty or intoxication on duty.
13.1.8 Illegal use of narcotics or drugs or use to the detriment of work performance.
13.1.9 Dishonesty or immorality.
13.1.10 Conviction by any state or by the Federal Government for a crime, the punishment for which could have been imprisonment in a federal penitentiary or a state prison; or conviction of any crime involving moral turpitude.
13.1.1 Unauthorized absence without leave.
13.1.12 Discourteous or non-cooperative treatment of the public or other employees.
13.1.13 Misuse of or misappropriation of City property or funds.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
13.1.14 Improper political activity as defined in Section 2.40.180 of the Municipal Code.
13.1.15 Failure to abide by any condition of employment stipulated in the Personnel Ordinance; Personnel Rules, any personnel Policy & Procedure, Administrative Directive or Memorandum of Understanding used in the establishment and maintenance of the City's personnel program; or by formal action of the Council or Board.
13.1.16 Failure to meet financial obligations to the extent that this leads to repeated attachment or garnishment of wages.
13.1.17 Acceptance of gifts or gratuities for favors or services performed during the course of City employment or due to City employment.
13.1.18 No City-owned, leased, or rented equipment, autos, trucks, instruments, tools, supplies, machines, or any other item which is the property of the City shall be used by any City employee while said employee is engaged in any outside employment or activity for compensation or otherwise for personal use, except upon prior authorization of the City Manager.
Further, no City employee shall allow any person to rent, borrow, or use any of the items mentioned, except upon prior authorization of the City Manager.
Violations and Penalties. Any violation of these provisions respecting use of City property shall constitute sufficient grounds for disciplinary action, including immediate dismissal of the employee from the City service.
13.1.19 Any other acts or omissions which are incompatible with or unfavorable to the public service.
13.1.20 Consuming, purchasing, or transporting any alcoholic beverages or illegal substances, or abusing the use of controlled substances during any portion of the paid duty time. This includes all coffee breaks, unpaid lunch breaks and during any overtime hours worked. The consumption of alcoholic beverages or illegal substances during unpaid lunch breaks is likewise prohibited.
Note: The Union’s agreement to prohibit consuming alcoholic beverages or illegal substances during unpaid lunch breaks was conditioned upon implementation of the same policy for managers and professional as well as the ATC/F&O units. That condition has been fulfilled.
13.2 Extent of Disciplinary Actions
The extent of the disciplinary action taken shall be commensurate with the offense,
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
provided that the prior employment history of the employee may also be considered pertinent. The disciplinary actions that may be taken are written reprimand, suspension without pay, reduction in step within range, demotion without consent, dismissal, or any appropriate combination of these.
13.2.1 Warning Notice is an informal procedure used by a supervisor to caution an employee and is not an official disciplinary action. The warning notice may be issued verbally or in writing. If the notice is presented in writing, the form titled “Employee Discussion Record” (Form PER 30) shall be used, and it shall be retained within the employee's department and purged after one (1) year if the situation corrects itself. In using this procedure, a written warning is not to be forwarded to the Human Resources Director for filing in the employee's official personnel file. Warning notices are not subject to either the grievance procedure or discipline appeal process; however, they may be considered as pertinent evidence or information in any hearing resulting from any subsequent official action taken.
13.2.2 Written Reprimand as a disciplinary action means official notification to the employee that there is cause for dissatisfaction with the employee's services and that further disciplinary measures may be taken if said cause is not corrected. Written reprimands shall be given in the manner and on forms prescribed or accepted by the Human Resources Director. Written reprimands shall be made a part of the employee's official personnel record and may be considered as pertinent evidence or information in any hearing. Written reprimands are not subject to the discipline appeal procedure, but may be subject to the grievance procedure.
13.2.3 Suspension without pay shall be a temporary separation from City service not to exceed thirty (30) consecutive days.
13.2.4 Reduction in Step within range as a disciplinary measure is the withdrawal of step advancements granted for merit, efficiency, and length of service.
Reduction in pay shall become effective on the effective date of the disciplinary action. Reduction may be made on permanent or temporary basis.
13.2.5 Demotion without consent as a disciplinary action shall be a reduction in classification to a classification having a lower maximum salary with reduction in salary in accordance with Policy & Procedure 37.7 Employment Status – Pay Plan, section 3.4.7. Demotion without consent may be made to the classification having the lowest maximum salary in the classification series or a classification series comparable to that within which the employee's position is located. Demotion may be made on a permanent or temporary basis.
13.2.6 Dismissal means the termination of an employee from the City service.
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
13.3 Authority for Disciplinary Actions
The appointing authority shall have authority to take disciplinary action, provided also that the appointing authority shall delegate to subordinate supervisory employees the authority to make immediate suspensions in emergency situations.
The duration of such suspensions may not be stipulated, however, except by the appointing authority. The Human Resources Director shall be notified of any contemplated disciplinary action prior to the time it is taken, provided that in emergency situations or other instances when prior notification is not practicable, the Human Resources Director may be notified as soon as possible subsequent to the time the action is taken.
13.4 Notice to Employees
Before taking any of the disciplinary actions specified in Section 13.2 of the MOU against any employee who has passed a probationary period for a position in the City's Competitive Service, the City shall cause to be served, personally or by certified mail, to the employee a “Notice of Intent to Take Disciplinary Action”.
Such notice shall contain:
13.4.1 A statement describing the proposed disciplinary action.
13.4.2 A reference to the rule or standard violated.
13.4.3 A summary of the facts, including acts or omissions, which substantiate that the rule or standard was violated.
13.4.4 A statement that the employee may review and request copies of materials upon which the proposed disciplinary action is based.
13.4.5 A statement that the employee upon whom such Notice of Intent to take Disciplinary Action has been served shall have at least five (5) working days from the receipt of the notice to respond to the City, either orally or in writing, before the proposed action is taken.
13.4.6 A statement that failure to respond to the notice will be regarded as a waiver of the employee's subsequent right to respond to the notice.
13.5 Employee Response
Upon the employee’s request, and for cause acceptable to the appointing authority, the City may extend the period for submitting a response. The City shall confirm such extension in writing. If the employee's response is not received within the period specified in the original Notice of Intent, or within an authorized extension period, any subsequent right to respond shall be forfeited.
13.6 Order of Disciplinary Action
Memorandum of Understanding between the
City of Concord and OPEIU Local 29 July 1, 2026 - June 30, 2029
At the expiration of the response period, and after consideration of the employee’s response, if any, the appointing authority shall determine if disciplinary action is warranted. If so, a written notice, including specific charges as to offense and the time, place, and circumstances of such offense shall be made to the employee at the time when any disciplinary action is made effective, provided that in emergency situations or other instances when simultaneous notification is not practicable, written notification may be given the following normal City working day. Said notice shall, whenever possible, be made in the form prescribed by the Human Resources Director and copies shall be submitted to the Human Resources Director for the employee's official personnel record.
13.7 Effective Date
A disciplinary action shall be effective as of the time designated by the person or persons authorizing the action, provided that no disciplinary action shall be recorded with an effective date which is prior to the date such action is taken. In addition, except for suspensions under emergency situations, the effective date shall not be earlier than the date of the notice of Order of Disciplinary Action.
13.8 Right of Appeal
An employee who has been suspended, demoted, dismissed, or whose pay step is reduced in the pay range shall be entitled to request a hearing as set forth below.
Written reprimands shall not be subject to the discipline appeal process, but may be subject to the grievance procedure as provided in Section 14 (Grievance Procedure).
13.9 Employee Representative
At any step in the discipline appeal procedure, the employee concerned will be represented by the Union or, alternatively, may elect self-representation. In either case, the employee concerned shall be personally present at all stages unless that employee specifically waives the right in writing.
13.10 Appeal Procedure
The following procedure shall be used in the appeal process:
13.10.1 Protest. Within seven (7) working days of the receipt of written notice of Order of Disciplinary Action, the disciplined employee may protest the disciplinary action. Such protest shall be in writing and given to the Human Resources Director.
13.10.2 Hearing. The Human Resources Director, within seven (7) working days of the receipt of such an employee's protest, shall initiate arrangements to hold a hearing between the City Manager or designee and the employee.