DATE: 11/25/2024
TO: Honorable Chair and Commissioners
FROM: Planning and Development Department
2024-125
APPLICATION REQUEST:

GPA2020-0002: General Plan Amendment to change the land use designation of 5.5 acres located north of Green River Road and west of Dominguez Ranch Road from Mixed Use II (Industrial & Commercial) to General Commercial, and change the land use designations on the south side of Green River Road and west of Dominguez Ranch Road from General Commercial, Mixed Use II, and Estate Residential to 49.31 acres of Mixed Use II, 20.39 acres of Estate Residential, and 83.34 acres of Open Space-General. (Applicant: PSIP WR Green River LLC, 500 Newport Center Drive, Suite 630, Newport Beach, CA 92660) RECOMMENDED ACTION:

That the Planning and Housing Commission adopt Resolution No. 2650 granting GPA2020- 0002 as part of Cycle I of General Plan Amendments for 2025, and recommend approval of GPA2020-0002 to the City Council based on the findings contained in the staff report and certify the Subsequent Environmental Impact Report to the Green River Ranch Specific Plan Environmental Impact Report (SCH#2022080640).

BACKGROUND
General Plan Amendment (GPA) 2020-0002 is a request by PSIP WR Green River, LLC to amend the city’s General Plan land use map to change and redistribute the General Plan land use designations located within the Green River Ranch Specific Plan. The purpose of the amendment is to facilitate the development of a 49.31-acre business park consisting of five warehouse/industrial buildings totaling 746,167 square feet. The development is located on the south side of Green River Road, between Fresno Road and Dominguez Ranch Road within the specific plan.

Green River Ranch Specific Plan Background
The Green River Ranch Specific Plan was originally approved by the city on February 7, 2021, and encompasses approximately 165.33 acres of undeveloped land located on the north and south sides of Green River Road, between Fresno Road and Dominguez Ranch Road (Exhibit 2). The established General Plan land uses within the specific plan are described below.
• Mixed Use II – Commercial and Industrial (MU II): Four planning areas totaling 59.01 acres are designated MU II. These areas are located on the north and south sides of Green River Road and west of Dominguez Ranch Road. The MU II designation allows for the development of light industrial uses or a mix of “clean” types of industrial and commercial uses.
• General Commercial (GC): Two planning areas totaling 8.12 acres are designated GC.

These areas are located on the south side of Green River Road and east side of Fresno Road. The GC designation allows a range of commercial uses that serve local neighborhoods, the community and visitors.
• Estate Residential (ER): The ER designation encompasses the largest planning area within the specific plan, totaling 98.2 acres, and covers the southern portion of the specific plan. The ER designation allows for the development of single family homes at a density ranging from 1 to 3 dwelling units to the acre (du/ac).

Table 1 summarizes the existing General Plan land use designations, specific plan zoning, acreages, and planning areas within the specific plan.

Table 1
Existing Green River Ranch Specific Plan Land Use Summary Existing General
Plan
Existing
Zoning
Existing
Planning
Area
Existing
Acreage
Existing Allowable Uses
Per the Zoning
Mixed Use II (MU II)
(Commercial &
Industrial)
Mixed Use 1, 2, 5, 7 59.01 Mix of commercial retail,
service, office, hotel, and
light industrial uses.

General
Commercial (GC)
General
Commercial
3, 4 8.12 Mix of commercial services,
retail, restaurant, and
freeway-oriented service
uses.

Estate Residential
(ER)
Estate
Residential
6 98.2 Up to 32 single family
residential dwellings.

Total Acreage 165.331

1. Includes 27.3 acres of manufactured slopes and streets.

Land Use Entitlements
GPA2020-0002 is being reviewed in conjunction with Specific Plan Amendment 2020-0006, Tentative Tract Map 37963, and Precise Plan 2020-0004. The purpose of each entitlement is summarized below.
• Specific Plan Amendment (SPA) 2020-0006 – SPA2020-0006 proposes to amend the Green River Ranch Specific Plan to reorganize the zoning districts and planning areas for consistency with the General Plan land use changes proposed by GPA2020-0002.

The amendment also includes corresponding changes to maps, figures and tables in the document as well as updates to the signage and landscape requirements. • Tentative Tract Map (TTM) 37963 – TTM 37963 proposes to subdivide 154.50 acres into seven (7) lots, which encompasses the areas of the Green River Ranch Specific Plan that are south of Green River Road.
• Precise Plan (PP) 2020-0004 – PP2020-0004 is for the review of the site plan, architecture, landscaping and other features associated with the five warehouse/industrial buildings totaling 746,167 square feet on 49.31acres in the proposed Business Park Industrial designation.

Land Acquisition
The applicant is in the process of acquiring 3.4 acres of city-owned land to be developed as part of the proposed business park (Exhibit 6). The 3.4 acres currently lie outside of the Green River Ranch Specific Plan’s east boundary and consist of 1.46 acres of a portion of the city’s Landscape Maintenance District (LMD) area (APN 101-190-034) and 1.94 acres of a portion of excess street right-of-way on Green River Road and a portion of the LMD property.

On August 16, 2023, the City Council adopted Resolution No. 2023-090 which declared the

3.4 acres as surplus land and that the land is no longer necessary for the city’s use. On July 8, 2024, the city received a written determination from the California Department of Housing and Community Development (HCD) confirming that the city’s disposition of the surplus land complies with the requirements under Surplus Land Act. The applicant is required to execute a Purchase and Sale Agreement with the city prior to the recordation of TTM 37963.

PROPOSED AMENDMENT
GPA2020-0002 proposes to change and redistribute the General Plan land use designations located with the Green River Ranch Specific Plan, including the adjacent 3.4 acres being added to the specific plan by SPA2020-0006. The existing and proposed land use changes are shown on the General Plan Amendment map attached as Exhibit 3 and described below. • Change the General Plan land use designation of the 5.05 acres located on the north side of Green River Ranch Road from MU II to GC.
• Expand the MU II land use designation on the south side of Green River Road replacing the GC designation on 8.12 acres. In total, the MU II designation will be reduced from 53.1 acres to 49.31 acres.
• Reduce the ER designation from 98.2 acres to 20.39 acres and designate 83.34 acres as Open Space General (OSG).

Table 2 summarizes the proposed General Plan land use designations and the compatible zoning designations proposed by SPA2020-0006. The designated land uses are identified by the planning areas established in the specific plan, including the assigned acreages. For reference, the zoning changes proposed by the SPA is provided as Exhibit 5.

Table 2
Proposed Green River Ranch Specific Plan Land Use Summary Proposed
General Plan
Proposed
Zoning
Proposed
Planning
Area
Proposed
Acreage
Proposed
Allowable Uses
Mixed Use II Business Park
Industrial1
1, 2, 3 49.31 Light business park
industrial uses.

General
Commercial
General
Commercial
4 5.50 Mix of commercial
services, retail, restaurant,
and freeway-oriented
service uses.

Estate
Residential
Estate
Residential
5 20.39 Up to 32 single family
residential dwellings.

Open Space
General
Open Space
General1
6 83.34 Permanent open space.

Circulation (Streets) N/A 1.46 ---
Total Acreage 160.00 ---

1. New zoning districts proposed by SPA2020-0006 for the Green River Ranch Specific Plan.

Table 3 provides a side-by-side comparison of the existing and proposed General Plan land use designations and acreages for the land within the specific plan.

Table 3
Existing and Proposed General Plan Land Use Summary
Existing
General Plan and Acreage
Proposed
General Plan and Acreage
Mixed Use II

59.01 acres
Mixed Use II

49.31 acres
General Commercial

8.12 acres
General Commercial

5.50 acres
Estate Residential

98.2 acres
Estate Residential

20.39 acres
N/A Open Space General (new)

83.34 acres
California Housing Accountability Act
The state’s Housing Accountability Act (Government Code Section 65589.5) was amended in 2019 to include the Housing Crisis Act of 2019 (Government Code Section 66300). The Housing Crisis Act of 2019 requires cities to maintain the residential capacity that existed at the time of adoption of the legislation to ensure a no net loss in the zoning for residential units. Cities are allowed to change a General Plan land use designation or rezone residential properties to a non-residential land use designation or zone or a less intense residential land use designation or zone only if the city concurrently changes the land use designation or rezones another parcel to make up for the shortfall in housing units lost under the previous General Plan land use change or zoning.

However, Section 66300(e)(4) provides that the Housing Crisis Act does not apply to a housing development project located within a very high fire hazard severity zone. Because the proposed project involves a housing development project on a site that is located entirely within a Very High Fire Hazard Severity Zone, the Housing Crisis Act does not apply to GPA2020-0002.

ENVIRONMENTAL ANALYSIS
Proposed Constrained Linkage 1
The Green River Ranch Specific Plan contains a wildlife linkage identified by the Western Riverside County’s Multiple Specific Habitat Conservation Plan (MSHCP) as Proposed Constrained Linkage 1 (PCL-1). The current alignment of PCL-1 extends through the specific plan from the Cleveland National Forest south of the specific plan to the Prado Dam and Santa Ana River areas north of the 91 Freeway. An exhibit for PCL-1 is attached as Exhibit 7.

In December 2023, the city submitted a Criteria Refinement Analysis (prepared by the applicant’s biology consultant, Glen Lukos Associates) on behalf of the applicant to the Western Riverside County Regional Conservation Authority (RCA), U.S. Fish and Wildlife Service, and California Department of Fish and Wildlife to have PCL-1 relocated off-site.

Development of the land within the specific plan would require the applicant to also design a wildlife linkage that meets the requirements of the MSCHP. Having PCL-1 relocated offsite would help to alleviate site constraints brought on by the wildlife linkage requirements.

On February 20, 2024 and March 25, 2024 the city and applicant received general agreements from the RCA, U.S. Fish and Wildlife Service, and California Department of Fish and Wildlife to have PCL-1 relocated onto land recently acquired by the RCA. The new alignment is located southwest of the Green River Ranch Specific Plan and outside of Corona’s city limits, within the jurisdiction of Riverside County. The new alignment was considered to be less constrained and superior compared to the current alignment to support wildlife movement.

Green River Ranch Specific Plan Subsequent EIR
The Green River Ranch Specific Plan EIR was certified by the city on February 7, 2021. In accordance with Section 15162 of the CEQA Guidelines, the city prepared a draft Subsequent EIR to the certified Green River Ranch Specific Plan Final EIR to address the potential environmental impacts associated with the revised Green River Ranch Specific Plan project. The Subsequent EIR also addresses the proposed 49.31-acre business park development and the relocation of PCL-1.

The project’s Subsequent EIR identifies environmental impacts that are capable of being mitigated to a less than significant level through the implementation of mitigation measures.

In the areas of biological resources and noise, the revised project would result in a reduction of impacts compared to the 2001 approved specific plan. In the areas of air quality and transportation, the revised project would continue to have significant and unavoidable impacts, even with the implementation of mitigation measures. These significant impacts are discussed further below.

The project’s air quality analysis indicated that the project would exceed the allowable threshold for certain pollutant emissions associated with the project’s operations. The source of the emissions includes stationary sources (chemicals from regular maintenance of landscaped areas, buildings, etc) and mobile sources (vehicles and trucks accessing the site). This impact does not change from the 2001 EIR which disclosed that the original project would exceed the allowable threshold for certain pollutants associated with the original project’s operations.

As it pertains to transportation, the project’s traffic impact analysis indicated that the project would exceed the city’s daily Vehicle Miles Threshold (VMT) threshold. VMT measures the number of miles that would be traveled by vehicles associated with the project. Although the Subsequent EIR proposes mitigation measures (ride share programs, carpooling, etc.) to help reduce the project’s VMT, there is no amount of feasible mitigation that can fully reduce the project’s VMT below the threshold, and therefore, the project’s transportation impact is considered to be significant. However, the number of daily vehicle trips generated by the project would decrease by 61% compared to the original project (original project showed 11,207 daily trips to and from the project site and the current project shows 4,370 daily trips).

Overall, most of the project’s environmental impacts remain similar to the impacts that were previously identified in the 2001 EIR for the original approved specific plan. Table 4 provides a comparison of the environmental impacts between the approved and proposed specific plan.

Table 4
Environmental Impact Comparison
of the Approved GRR Specific Plan vs. Proposed GRR Specific Plan Environmental Area of
Concern
Level of Significance
(Environmental Impact) for
Approved GRR Specific Plan
Proposed GRR Specific
Plan Comparison
Aesthetics Less than Significant with
Mitigation
Similar
Agricultural & Forestry
Resources
Less than Significant Similar
Air Quality Significant and Unavoidable Similar
Biological Resources Significant and Unavoidable Reduced Cultural Resources Less than Significant Similar
Energy No Impact Similar
Geology/Soils/Paleontology Less than Significant with
Mitigation
Similar
Greenhous Gas Emissions Was not required by CEQA to
be addressed in 2001
Less than Significant with
Mitigation
Hazards & Hazardous
Materials
Less than Significant Similar
Hydrology/Water Quality Less than Significant with
Mitigation
Similar
Land Use & Planning Less than Significant Similar
Minerals Less than Significant Similar
Noise Less than Significant with
Mitigation
Reduced
Population & Housing Less than Significant Similar
Public Services Less than Significant with
Mitigation
Similar
Recreation Less than Significant Similar
Transportation Significant and Unavoidable,
(in terms of the number of
vehicle trips to be generated
by the original project)
Similar (in terms of the
project’s daily VMT)
Reduced (in terms of the
number of vehicle trips to
be generated by the
proposed project)
Tribal Cultural Resources Was not required by CEQA to
be addressed in 2001
Less than Significant with
Mitigation
Utilities/Service Systems Less than Significant Similar Wildfire Less than Significant with
Mitigation
Similar

FISCAL IMPACT
The applicant has paid the applicable application processing fees for the project.

PUBLIC NOTICE AND COMMENTS
In accordance with CEQA procedures, the Planning and Development Department mailed a Notice of Availability notifying the public of the release of the draft Subsequent EIR to all property owners within a 500-foot radius of the project site, regulatory agencies, and interested parties on October 11, 2024 for public comment for a period of 45 days. The Notice of Availability was also posted on the project site, submitted to the State Clearinghouse (SCH No. 2022080640), and mailed to the residential properties within the adjacent Montenero Community (most properties were beyond the 500-foot noticing radius).

A separate 20-day public hearing notice for the November 25, 2024 Planning and Housing Commission meeting was mailed to all property owners within a 500-foot radius of the project site, regulatory agencies, and interested parties. The public hearing notice was also advertised on the Sentinel Weekly newspaper, posted onsite, and mailed to the residential properties within the adjacent Montenero Community.

As of the preparation of this staff report, the Planning and Development Department has received written comments in response to the draft Subsequent EIR from the following:
• City of Chino Community Development Department
• Montenero Community Association
• Mr. Paul Ramlo, president of the Montenero Community Homeowner’s Association • Advocates For The Environment
• Riverside County Flood Control & Water Conservation District • Riverside Transportation Authority
• Northwest Mosquito and Vector Control District
• Residents (multiple)
The comments are attached as Exhibit 9.

STAFF ANALYSIS
The proposed amendment to the General Plan land use map aligns with the established goals and policies of the General Plan to provide for a mix of land uses based on the current market and to protect and conserve wildlife and habitat. The Mixed Use II and General Commercial land use designations provide an opportunity for developing the project site according to the objectives of the Green River Ranch Specific Plan. The amendment also preserves the rural and low density residential character of the neighborhood by using the existing Estate Residential land use designation on approximately 21 acres and adding Open Space General on 83.34 acres of natural hillsides.

The amendment overall maintains the existing land use pattern that was established for the Green River Ranch Specific Plan by having the commercial and light industrial uses along Green River Road and the freeway, and maintaining the residential land use on the southern area of the specific plan. The area continues to be buffered from existing surrounding development by Dominguez Ranch Road and natural intervening features such as topography and distance.

Therefore, the Planning and Development Department recommends approval of GPA2020- 0002 based on the recommended conditions of approval in Exhibit 4 and the findings of approval below.

FINDINGS FOR THE APPROVAL OF GPA2020-0002

1. In accordance with Section 15162 of the State Guidelines for Implementing the California Environmental Quality Act (CEQA), the City of Corona, as the lead agency under CEQA, prepared a draft Subsequent Environmental Impact Report (EIR) to the Green River Ranch Specific Plan Final Environmental Impact Report certified by the City Council on February 7, 2001. The Subsequent EIR was prepared to address the potential environmental impacts of the proposed changes to the Green River Ranch Specific Plan.

The Subsequent EIR also addresses the relocation of Proposed Constrained Linkage 1 (PCL-1) of the Riverside County Multiple Species Habitat Conservation Plan as a separate but related project. The Subsequent EIR was submitted to the State Clearinghouse (SCH No. 2022080640). The Subsequent EIR identified most environmental impacts from the previous EIR remain unchanged, with impacts to air quality and transportation being significant and unavoidable.

2. GPA2020-0002 it is in the public interest and would not be detrimental to public health, safety and welfare for the following reason:
a. There is adequate infrastructure in place to accommodate the land use changes proposed by GPA2020-0002. The project site and its intended uses will not unreasonably interfere with the use and enjoyment of neighboring existing or future developments, will not create traffic or pedestrian hazards, and will not otherwise have a negative impact on the aesthetics, health, safety or welfare of neighboring uses because future development allowed by the Mixed Use II, Estate Residential and Open Space General designations will be required to adhere to the development standards required by the zoning of their respective properties and other development standards required by the Green River Ranch Specific Plan, as amended by SPA2020-0006.

3. GPA2020-0002 it is an internally consistent with the elements of the General Plan, including the goals and policies stated therein for the following reasons:
a. The amendment proposes land uses that fit with the current market and facilitates the development of property that is accessible from the freeway and in proximity to other urban land uses, which is consistent with General Plan Land Use Policy LU-3.3, which is to allow flexibility in the defined land use types, densities and intensities to account for changes in housing needs and characteristics, industrial and employment markets, and retail commercial enterprises that will occur during implementation of the General Plan that such deviations be consistent with the Plan’s vision, goals and overall policy intentions. b. The amendment is consistent with General Plan Goal LU-16 by preserving approximately 80 acres of permanent open space land that provides Corona’s residents with opportunities to enjoy the natural environment, provide visual “relief” from urban development, protect significant plant and animal habitats, and protect development from natural environmental hazards. c. The amendment is consistent with General Plan Goal ER-6 by protecting over 80 acres of permanent open space to enhance and sustain significant plant and wildlife species and habitat that exist in Corona and its Planning Areas, for the long-term benefit of the natural environment and Corona residents and visitors. d. The amendment is consistent with General Plan Goal LU-13 by providing the structure for a mix of general commercial, estate residential, business park industrial, and open space uses. The non-residential uses will house a variety of businesses, enhance the local economy and is appropriately situated on Green River Road, a major arterial roadway, near the 91 and 71 freeways. The residential and open space uses preserve the existing low density and rural character of the neighborhood.

4. Pursuant to California Government Code Section 66300 (Housing Crisis Act of 2019), the change in the Estate Residential General Plan land use designation from 98.2 acres of Estate Residential to 20.39 acres of Estate Residential would not individually or cumulatively reduce the site’s residential development capacity for the following reason:
a. The Housing Crisis Act of 2019 (Government Code Section 66300; enacted by Senate Bill 330) prevents a city from changing the general plan land use designation, specific plan land use designation, or zoning of a parcel to a less intensive use below what was in effect on January 1, 2018, unless the city concurrently changes the regulations applicable to other parcels within the jurisdiction to ensure that there is no net loss in residential capacity. (Subds. (b)(1)(A), (h)(1).) However, Section 66300(e)(4) provides that the Housing Crisis Act does not apply to a housing development project located within a very high fire hazard severity zone. Because the proposed Project involves a housing development project on a site that is located entirely within a Very High Fire Hazard Severity Zone, the Housing Crisis Act does not apply to GPA2020-0002.

PREPARED BY: SANDRA VANIAN, PLANNING MANAGER
SUBMITTED BY: JOANNE COLETTA, PLANNING AND DEVELOPMENT DIRECTOR Exhibits:

1. Resolution No. 2650

2. Locational Map

3. General Plan Amendment Map

4. Conditions of Approval

5. Specific Plan Amendment Map

6. Land Acquisition Exhibit

7. Proposed Constrained Linkage 1 Realignment Exhibit

8. Environmental Documentation available at:
https://www.coronaca.gov/government/departments/communitydevelopment/planning-division

9. Public Response
Case Planner: Sandra Vanian (951) 736-2262

RESOLUTION NO. 2650
APPLICATION NUMBER: GPA2020-0002

A RESOLUTION OF THE PLANNING AND HOUSING

COMMISSION OF THE CITY OF CORONA, CALIFORNIA

APPROVING A GENERAL PLAN AMENDMENT TO CHANGE
THE LAND USE DESIGNATION OF 5.5 ACRES LOCATED

NORTH OF GREEN RIVER ROAD AND WEST OF

DOMINGUEZ RANCH ROAD FROM MIXED USE II
(INDUSTRIAL & COMMERCIAL) TO GENERAL

COMMERCIAL, AND CHANGE THE LAND USE

DESIGNATIONS ON THE SOUTH SIDE OF GREEN RIVER

ROAD AND WEST OF DOMINGUEZ RANCH ROAD FROM

GENERAL COMMERCIAL, MIXED USE II, AND ESTATE
RESIDENTIAL TO 49.31 ACRES OF MIXED USE II, 20.39
ACRES OF ESTATE RESIDENTIAL, AND 83.34 ACRES OF
OPEN SPACE-GENERAL AS PART OF CYCLE 1 FOR
GENERAL PLAN AMENDMENTS 2025. (APPLICANT: PSIP

WR GREEN RIVER LLC)
WHEREAS, the Planning and Housing Commission of the City of Corona initiated proceedings through GPA2020-0002 to consider amending the City’s General Plan land use map to change the land use designation of 5.5 acres located north of Green River Road and west of Dominguez Ranch Road from Mixed Use II (Industrial & Commercial) to General Commercial, and change the land use designations on the south side of Green River Road and west of Dominguez Ranch Road from General Commercial, Mixed Use II, and Estate Residential to 49.31 acres of Mixed Use II, 20.39 acres of Estate Residential, and 83.34 acres of Open Space-General; and WHEREAS, the General Plan Amendment was submitted in conjunction with Specific Plan Amendment 2020-0006 (SPA2020-0006), Tentative Tract Map 37963 (TTM 37963), and Precise Plan 2020-0004 (PP2020-0004); and
WHEREAS, the Planning and Housing Commission held a noticed public hearing for GPA2020-0002, SPA2020-0006, TTM 37963, and PP2020-0004 on November 25, 2024 as required by law, and
RESOLUTION NO. 2650
APPLICATION NO. GPA2020-0002
PAGE | 2
WHEREAS, the Planning and Housing Commission after close of the public hearing considered all of the evidence presented in its deliberations; and WHEREAS, the Planning and Housing Commission, by the majority, approved GPA2020-0002 in accordance with the analysis and findings in the staff report; and WHEREAS, the Planning and Housing Commission recommended the City Council approve GPA2020-0002 and certify the Subsequent Environmental Impact Report (EIR) to the Green River Ranch Specific Plan Environmental Impact Report (SCH No. 2022080640) prepared for GPA2020-0002 pursuant to CEQA Guidelines Section 15162, because based on the information contained in the Subsequent EIR and the administrative records for this project, including all written and oral evidence provided during the comment period and presented to the Planning and Housing Commission, the Commission finds that most environmental impacts from the previous EIR remain unchanged, with impacts to air quality and transportation being significant and unavoidable.

NOW, THEREFORE BE IT RESOLVED BY THE PLANNING AND

HOUSING COMMISSION OF THE CITY OF CORONA, CALIFORNIA, DOES ORDAIN AS FOLLOWS:

SECTION 1. CEQA Findings. The Green River Ranch Specific Plan Final EIR was certified by the city on February 7, 2021. In accordance with Section 15162 of the CEQA Guidelines, the city prepared a draft Subsequent EIR to the certified Green River Ranch Specific Plan Final EIR to address the potential environmental impacts associated with the revised Green River Ranch Specific Plan project. The Subsequent EIR also addresses 49.31-acre business park development proposed by PP2020-0004 and the relocation of Proposed Constrained Linkage 1 (PCL-1) of the Western Riverside County Multiple Species Habitat Conservation Plan. The Subsequent EIR was submitted to the State Clearinghouse (SCH No. 2022080640). The Subsequent EIR identified most environmental impacts from the previous EIR remain unchanged, with impacts to air quality and transportation being significant and unavoidable.

Overall, most of the project’s environmental impacts remain similar to the impacts that were previously identified in the 2001 EIR for the original approved specific plan.

SECTION 2. Findings. GPA2020-0002 is internally consistent with the elements of the General Plan, including the goals and policies stated therein for the following reasons:

1. In accordance with Section 15162 of the State Guidelines for Implementing the California Environmental Quality Act (CEQA), the City of Corona, as the lead agency under CEQA, prepared a draft Subsequent Environmental Impact Report (EIR) to the Green River Ranch Specific Plan Final Environmental Impact Report certified by the City Council on February 7, 2001. The Subsequent EIR was prepared to address the potential environmental impacts of the proposed changes to the Green River Ranch Specific Plan. The Subsequent EIR also addresses the relocation of Proposed Constrained Linkage 1 (PCL-1) of the Riverside County RESOLUTION NO. 2650
APPLICATION NO. GPA2020-0002
PAGE | 3
Multiple Species Habitat Conservation Plan as a separate but related project. The Subsequent EIR was submitted to the State Clearinghouse (SCH No. 2022080640). The Subsequent EIR identified most environmental impacts from the previous EIR remain unchanged, with impacts to air quality and transportation being significant and unavoidable.

2. GPA2020-0002 it is in the public interest and would not be detrimental to public health, safety and welfare for the following reason:
a. There is adequate infrastructure in place to accommodate the land use changes proposed by GPA2020-0002. The project site and its intended uses will not unreasonably interfere with the use and enjoyment of neighboring existing or future developments, will not create traffic or pedestrian hazards, and will not otherwise have a negative impact on the aesthetics, health, safety or welfare of neighboring uses because future development allowed by the Mixed Use II, Estate Residential and Open Space General designations will be required to adhere to the development standards required by the zoning of their respective properties and other development standards required by the Green River Ranch Specific Plan, as amended by SPA2020-0006.

3. GPA2020-0002 it is an internally consistent with the elements of the General Plan, including the goals and policies stated therein for the following reasons:
a. The amendment proposes land uses that fit with the current market and facilitates the development of property that is accessible from the freeway and in proximity to other urban land uses, which is consistent with General Plan Land Use Policy LU-3.3, which is to allow flexibility in the defined land use types, densities and intensities to account for changes in housing needs and characteristics, industrial and employment markets, and retail commercial enterprises that will occur during implementation of the General Plan that such deviations be consistent with the Plan’s vision, goals and overall policy intentions.
b. The amendment is consistent with General Plan Goal LU-16 by preserving approximately 80 acres of permanent open space land that provides Corona’s residents with opportunities to enjoy the natural environment, provide visual “relief” from urban development, protect significant plant and animal habitats, and protect development from natural environmental hazards.
c. The amendment is consistent with General Plan Goal ER-6 by protecting over 80 acres of permanent open space to enhance and sustain significant plant and wildlife species and habitat that exist in Corona and its Planning Areas, for the long-term benefit of the natural environment and Corona residents and visitors.

RESOLUTION NO. 2650
APPLICATION NO. GPA2020-0002
PAGE | 4
d. The amendment is consistent with General Plan Goal LU-13 by providing the structure for a mix of general commercial, estate residential, business park industrial, and open space uses. The non-residential uses will house a variety of businesses, enhance the local economy and is appropriately situated on Green River Road, a major arterial roadway, near the 91 and 71 freeways. The residential and open space uses preserve the existing low density and rural character of the neighborhood.

4. Pursuant to California Government Code Section 66300 (Housing Crisis Act of 2019), the change in the Estate Residential General Plan land use designation from 98.2 acres of Estate Residential to 20.39 acres of Estate Residential would not individually or cumulatively reduce the site’s residential development capacity for the following reason:
a. The Housing Crisis Act of 2019 (Government Code Section 66300; enacted by Senate Bill 330) prevents a city from changing the general plan land use designation, specific plan land use designation, or zoning of a parcel to a less intensive use below what was in effect on January 1, 2018, unless the city concurrently changes the regulations applicable to other parcels within the jurisdiction to ensure that there is no net loss in residential capacity. (Subds. (b)(1)(A), (h)(1).) However, Section 66300(e)(4) provides that the Housing Crisis Act does not apply to a housing development project located within a very high fire hazard severity zone. Because the proposed Project involves a housing development project on a site that is located entirely within a Very High Fire Hazard Severity Zone, the Housing Crisis Act does not apply to GPA2020-0002.

THAT THE COMMISSION passes and adopts Resolution No. 2650 approving the General Plan Amendment granted in accordance with Exhibit 3 of the staff report for GPA2020- 0002; and
THAT THE COMMISSION recommends to the City Council that it approve such General Plan Amendment as part of Cycle 1 for General Plan Amendments 2025 and certify the Subsequent Environmental Impact Report to the Green River Ranch Specific Plan Environmental Impact Report (SCH#2022080640) prepared for GPA2020-0002.

LOCATIONAL MAP
General Plan Legend:

ER – Estate Residential
GC – General Commercial
LI – Light Industrial
LMDR – Low Medium Density Residential
MDR – Medium Density Residential
OSR – Open Space Residential
OSG – Open Space General
Zoning Legend:

A – Agricultural
C-3 – General Commercial
FS – Fire Station
LDR – Low Density Residential
LMDR – Low Medium Density Residential
M-1 – Light Manufacturing
MH – Mobile Home Park
OS – Open Space

Details:

LIST OF CONDITIONS

DEPARTMENT CONTACT

PLANNING

1. The project shall comply with all applicable requirements of the Corona Municipal Code (CMC) and ordinances and the relevant Specific Plan, if any, including the payment of all required fees.

2. The applicant or his successor in interest shall comply with the mitigation measures established in the Green River Ranch Subsequent Environmental Impact Report.

3. To the fullest extent permitted by law, the applicant shall defend, indemnify and hold the City of Corona and its directors, officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, proceedings, costs, expenses, liabilities, losses, damages or injuries of any kind, in law or equity, in any manner arising out of, pertaining to, or incident to any attack against or attempt to challenge, set aside, void or annul any approval, decision or other action of the City of Corona, whether such approval, decision or other action was by its City Council, Planning and Housing Commission or other board, director, official, officer, employee, volunteer or agent. To the extent that Government Code Section 66474.9 applies, the City will promptly notify the applicant of any claim, action or proceeding made known to the City to which Government Code Section 66474.9 applies and the City will fully cooperate in the defense. The Applicant's obligations hereunder shall include, without limitation, the payment of any and all damages, consultant and expert fees, and attorney's fees and other related costs and expenses. The City shall have the right to retain such legal counsel as the City deems necessary and appropriate.

4. Nothing herein shall be construed to require City to defend any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action. If at any time Applicant chooses not to defend (or continue to defend) any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action, the City may choose, in its sole discretion, to defend or not defend any such action. In the event that the City decides not to defend or continue the defense, Applicant shall be obligated to reimburse City for any and all costs, fees, penalties or damages associated with dismissing the action or proceeding. If at any time both the Applicant and the City choose not to defend (or continue to defend) any action noted herein, all subject City approvals, decisions or other actions shall be null and void. The Applicant shall be required to enter into any reimbursement agreement deemed necessary by the City to effectuate the terms of this condition.

Project Number: GPA2020-0002
Applied: 8/13/2020 Approved:

Closed: Expired:

Status: RECEIVED
Parent Project: DPR2019-
0030

AMEND GENERAL PLAN FOR GREEN RIVER RANCH

SPECIFIC PLAN
Site Address: GREEN RIVER RD / DOMINGUEZ RANCH RD CORONA, CA 0 GARY EDWARDS, PSIP WR GREEN RIVER, LLC
500 NEWPORT CENTER DRIVE NEWPORT BEACH CA, 92660
Description:

Applicant:
1 of 1
Project Conditions
City of Corona

EXISTING AND PROPOSED SPECIFIC PLAN LAND USE DESIGNATIONS

PA 6
PA 4 PA 3
PA 2
PA 1
PA 7
PA 5

LAND ACQUISITION EXHIBIT
Proposed Constrained Linkage 1 (PCL-1) Relocation Exhibit DRAFT

SU BSEQUENT ENVIRONMENTAL IMPACT REPORT

FOR THE

GREEN RIVER RANCH SPECIFIC PLAN AMENDMENT &

BUSINESS PARK INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PROPOSED CONSTRAINED LINKAGE 1

SCH NO. 2022080640

CITY OF CORONA, CALIFORNIA

September 2024
This Page Intentionally Left Blank

DRAFT

SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

FOR THE

GREEN RIVER RANCH SPECIFIC PLAN AMENDMENT &

BUSINESS PARK INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PROPOSED CONSTRAINED LINKAGE 1
SCH NO. 2022080640

CITY OF CORONA, CALIFORNIA

Prepared For:

City of Corona
Planning and Development Department
400 S. Vicentia Avenue
Corona, California 92882
(951) 736-2434
Prepared by:

Enplanners, Inc.

P.O. Box 960
Lake Arrowhead, California 92352
(951) 289-5233

September 2024
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

TABLE OF CONTENTS

ENPLANNERS
i

TABLE OF CONTENTS

1.0 EXECUTIVE SUMMARY........................................................................................1-1

1.1 PROPOSED CHANGES TO THE APPROVED PROJECT.........................1-1

1.2 PROJECT OBJECTIVES...............................................................................1-2

1.3 REQUIRED APPROVALS............................................................................1-2

1.4 PURPOSE OF A SUPPLEMENTAL ENVIRONMENTAL IMPACT
REPORT.........................................................................................................1-4

1.5 TECHNICAL STUDIES AND RELATED DOCUMENTS
INCORPORATED BY REFERENCE...........................................................1-6

1.6 SCOPING MEETING AND NOTICE OF PREPARATION........................1-8

1.7 PUBLIC REVIEW PERIOD..........................................................................1-8

1.8 SUMMARY OF PROJECT ALTERNATIVES ..........................................1-10

1.9 SUMMARY OF ENVIRONMENTAL IMPACTS AND
MITIGATION MEASURES........................................................................1-11

2.0 INTRODUCTION......................................................................................................2-1

2.1 PURPOSE OF THIS SUBSEQUENT ENVIRONMENTAL IMPACT
REPORT.........................................................................................................2-1

2.2 PROPOSED MODIFIED PROJECT .............................................................2-1

2.3 PROPOSED RELOCATION OF PCL-1 .......................................................2-2

2.4 BASIS FOR AND INTENDED USE OF THIS SUBESQUENT EIR..........2-2

2.5 CONTENT AND ORGANIZATION OF THIS SUBSEQUENT EIT ..........2-4

2.6 LEAD AGENCY CONTACT INFORMATION...........................................2-7

2.7 PUBLIC SCOPING MEETING.....................................................................2-7

2.8 NOP PUBLIC REVIEW PERIOD...............................................................2-13

2.9 DRAFT SEIR REVIEW PERIOD ...............................................................2-26

3.0 PROJECT DESCRIPTION ........................................................................................3-1

3.1 PROJECT LOCATION AND SETTING ......................................................3-1

3.1.1 MODIFIED PROJECT...................................................................................3-1

3.1.2 RELOCATION OF PCL-1.............................................................................3-7

3.2 MODIFIED PROJECT DEFINITION.........................................................3-11

3.2.1 MODIFIED PROJECT OVERVIEW ..........................................................3-11

3.2.2 PROPOSED GENERAL PLAN AMENDMENT........................................3-12

3.2.3 PROPOSED SPECIFIC PLAN AMENDMENT .........................................3-15

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

TABLE OF CONTENTS

ENPLANNERS
ii

3.2.4 PROPOSED TENTATIVE TRACT MAP...................................................3-15

3.2.5 PROPOSED PRECISE PLAN .....................................................................3-19

3.3 RELOCATION OF PCL-1 PROJECT DEFINITION .................................3-24

3.4 EXISTING LAND USES, GENERAL PLAN LAND USE
DESIGNATIONS, AND ZONING..............................................................3-24

3.5 PROJECT OBJECTIVES.............................................................................3-26

3.6 DISCRETIONARY ACTIONS, PERMITS, AND OTHER
APPORVALS...............................................................................................3-27

4.0 MODIFIED PROJECT ENVIRONMENTAL IMPACT ANALYSIS ......................4-1

4.0.1 APPROACH TO THE ENVIRONMENTAL ANALYSIS OF THE
PROPOSED MODIFIED PROJECT .............................................................4-1

4.0.2 MODIFIED ENVIRONMENTAL CHECKLIST..........................................4-2

4.1 AESTHETICS .............................................................................................4.1-1

4.2 AGRICULTURE AND FOREST RESOURCES .......................................4.2-1

4.3 AIR QUALITY ...........................................................................................4.3-1

4.4 BIOLOGICAL RESOURCES.....................................................................4.4-1

4.5 CULTURAL RESOURCES........................................................................4.5-1

4.6 ENERGY.....................................................................................................4.6-1

4.7 GEOLOGY AND SOILS............................................................................4.7-1

4.8 GREENHOUSE GAS EMISSIONS ...........................................................4.8-1

4.9 HAZARDS AND HAZARDOUS MATERIALS.......................................4.9-1

4.10 HYDROLOGY AND WATER QUALITY ..............................................4.10-1

4.11 LAND USE AND PLANNING ................................................................4.11-1

4.12 MINERAL RESOURCES.........................................................................4.12-1

4.13 NOISE .......................................................................................................4.13-1

4.14 POPULATION AND HOUSING .............................................................4.14-1

4.15 PUBLIC SERVICES.................................................................................4.15-1

4.16 RECREATION..........................................................................................4.16-1

4.17 TRANSPORTATION ...............................................................................4.17-1

4.18 TRIBAL CULTURAL RESOURCES ......................................................4.18-1

4.19 UTILITIES AND SERVICE SYSTEMS..................................................4.19-1

4.20 WILDFIRE................................................................................................4.20-1

5.0 RELOCATION OF PCL-1 PROJECT ENVIRONMENTAL IMPACT
ANALYSIS ................................................................................................................5-1

6.0 ALTERNATIVES ......................................................................................................6-1

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

TABLE OF CONTENTS

ENPLANNERS
iii

6.1 INTRODUCTION..........................................................................................6-1

6.2 PROJECT OBJECTIVES...............................................................................6-2

6.3 2001 EIR ALTERNATIVES..........................................................................6-3

6.3.1 2001 EIR ALTERNATIVE 1: NO BUILD ALTERNATIVE.......................6-3

6.3.2 2001 EIR ALTERNATIVE 2: NO PROJECT ALTENATIVE.....................6-4

6.3.3 2001 EIR ALTERNATIVE 3: COMMERCIAL-INDUSTRIAL
ALTERNATIVE ............................................................................................6-4

6.3.4 2001 EIR ALTERNATIVE 4: RESIDENTIAL.............................................6-5

6.3.5 2001 EIR ENVIRONMENTALLY SUPERIOR ALTERNATIVE...............6-5

6.4 ALTERNATIVES TO CONSIDER IN THIS SEIR......................................6-6

6.4.1 ALTERNATIVE 1: NO PROJECT/NO BUILD ALTERNATIVE...............6-6

6.4.2 ALTERNATIVE 2: MIXED USE ALTERNATIVE.....................................6-7

6.4.3 ALTERNATIVE 3: RESIDENTIAL ALTERNATIVE ................................6-9

6.5 SUMMARY OF POTENTIAL IMPACTS OF ALTERNATIVES.............6-10

6.5 ENVIRONMENTALLY SUPERIOR ALTERNATIVE.............................6-12

7.0 OTHER CEQA-REQUIRED ANALYSIS.................................................................7-1

7.1 CEQA REQUIREMENTS .............................................................................7-1

7.2 SIGNIFICANT AND IRREVERSIBLE ENVIRONMENTAL
CHANGES .....................................................................................................7-1

7.3 GROWTH INDUCING IMPACTS ...............................................................7-3

7.4 MANDATORY FINDINGS OF SIGNIFICANCE........................................7-5

8.0 REFERENCES...........................................................................................................8-1

APPENDICES
A: Scoping Meeting Comments
B: NOP, NOP Comments
C: Green River Ranch Visual Impact Analysis
D-1: Air Quality Impact Analysis
D-2: Health Risk Assessment
E-1: Biological Technical Report
E-2: Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis E-3: Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis F: Phase I Cultural Resources Assessment
G: Energy Analysis
H-1: EIR-Level Geotechnical Study
H-2: Update of EIR-Level Geotechnical Study
H-3: Paleontological Resource Record Search Update
I: Greenhouse Gas Analysis
J: Phase I Environmental Site Assessment Update

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

TABLE OF CONTENTS

ENPLANNERS
iv
K-1: Preliminary Drainage Report
K-2: Project Specific Water Quality Management Plan
L: Noise and Vibration Analysis
M-1: Traffic Analysis
M-2: Vehicle Miles Traveled (VMT) Analysis
M-2: Preliminary Wastewater Report
N: Sacred Lands File Search
O-1: Preliminary Wastewater Report
O-2: Preliminary Water Report
O-3: Water Supply Assessment
P: Fire Protection Plan
Q: Criteria Refinement Analysis Relocation of Proposed Constrained Linkage 1

FIGURES
Figure 3.1: Regional Location..............................................................................................................................3-2 Figure 3.2: Project Vicinity..................................................................................................................................3-3 Figure 3.3: PCL-1 Alignment...............................................................................................................................3-5 Figure 3.4: Existing and Proposed General Plan Land Use Designations...........................................................3-7 Figure 3.5: Existing and Proposed Specific Plan Land Use Designations...........................................................3-7 Figure 3.6: Proposed Business Park Site Plan......................................................................................................3-9 Figure 4.1-1: Site Photos...................................................................................................................................4.1-3 Figure 4.1-2: Conceptual Rendering – Aerial Perspective..............................................................................4.1-15 Figure 4.1-3: Conceptual Rendering – Westerly Perspective .........................................................................4.1-17 Figure 4.1-4: B1 Building Elevations 1 of 2 ...................................................................................................4.1-23 Figure 4.1-5: B1 Building Elevations 2 of 2 ...................................................................................................4.1-25 Figure 4.1-6: B2 Building Elevations .............................................................................................................4.1-27 Figure 4.1-7: B3 Building Elevations .............................................................................................................4.1-29 Figure 4.1-8: B4 Building Elevations .............................................................................................................4.1-31 Figure 4.1-9: B5 Building Elevations .............................................................................................................4.1-33 Figure 4.1-10: Conceptual Landscape Plan.....................................................................................................4.1-35 Figure 4.1-11: Site Photometrics B1...............................................................................................................4.1-39 Figure 4.1-12: Site Photometrics B2, 3, 4, 5...................................................................................................4.1-41 Figure 4.4-1: Vegetation Map ...........................................................................................................................4.4-7 Figure 4.4-2: RWQCB Jurisdictional Drainages.............................................................................................4.4-13 Figure 4.4-3: CDFW Jurisdictional Drainages................................................................................................4.4-15 Figure 4.4-4: MSHCP Jurisdictional Drainages..............................................................................................4.4-17 Figure 4.20-1: Fuel Modification Zones.......................................................................................................4.20-13 Figure 4.20-2: Wildfire History ....................................................................................................................4.20-17 Figure 5.1: PCL-1 Vegetation Map....................................................................................................................5-15 TABLES
Table 1-1: Summary of Impacts, Mitigation Measures, and Level of Significance after Mitigation ................1-13 Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting ................................2-7 Table 2-2: Summary of Comments Received in Response to the NOP.............................................................2-13 Table 4.3-1: Overall Construction Emissions Summary – Without Mitigation..............................................4.3-19 Table 4.3-2: Overall Construction Emissions Summary – With Mitigation...................................................4.3-19

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

TABLE OF CONTENTS

ENPLANNERS
v
Table 4.3-3: Summary of Peak Operational Emissions – Without Mitigation ...............................................4.3-20 Table 4.3-4: Summary of Peak Operational Emissions – With Mitigation ....................................................4.3-21 Table 4.3-5: Localized Significance Summary of Operations – Without Mitigation.....................................4.3-23 Table 4.3-6: Localized Significance Summary of Operations – With Mitigation ..........................................4.3-23 Table 4.3-5: Summary of Construction and Operational Cancer and Non-Cancer Risks Without Mitigation....................................................................................................................................4.3-23 Table 4.4-1: Natural Communities within the Project Site and Offsite Improvements....................................4.4-6 Table 4.8-1: Project GHG Emissions..............................................................................................................4.8-19 Table 4.9-1: Trip Generation Comparison Approved Project vs. Modified Project.......................................4.9-10 Table 4.11-1: Comparison of the Approved and Modified Project GRRSP Land Uses.................................4.11-3 Table 4.11-2: GRRSPA (Modified Project) Consistency with Connect SoCal Goals....................................4.11-9 Table 4.11-3: GRRSPA (Modified Project) Conformance with City General Plan Goals ..........................4.11-10 Table 4.13-1: 24-Hour Ambient Noise Level Measurements.........................................................................4.13-3 Table 4.13-2: Significance Criteria Summary ................................................................................................4.13-6 Table 4.13-3: Operational Noise Standards....................................................................................................4.13-7 Table 4.14-1: City of Corona Population, Households, and Employment .....................................................4.14-3 Table 5.4-1: Vegetation Communities within the Existing PCL-1 and Alternate PCL-1..................................5-14 Table 6.5-1 - Comparison of the Project Alternatives ......................................................................................6-10 Table 6.5-2 - Comparison of the Approved Project vs. Modified Project ........................................................6-11

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

TABLE OF CONTENTS

ENPLANNERS
vi
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-1

1.0 EXECUTIVE SUMMARY

1.1 PROPOSED CHANGES TO THE APPROVED PROJECT
The Project Applicant proposes to Amend the Green River Ranch Specific Plan (GRRSP) to modify land uses and rearrange Planning Areas (PAs). The proposed GRRSP Amendment (GRRSPA) would create Business Park Industrial (BPI) PAs that are also proposed for development as part of the Project. The combined affect of the GRRSPA and BPI Development proposal is defined as the Modified Project in this Supplemental Environmental Impact Report (SEIR).

The Project Applicant, PSIP WR Green River, LLC, seeks approval of Amendment No. 1 to the GRRSP to rearrange and change the previously approved land uses, slightly expand the Specific Plan boundary, and designate a large portion of the site as open space for permanent preservation to compliance with the WR-MSHCP. Concurrent with the proposed GRRSPA, the Project Applicant requests entitlements for development of the BPI PAs located in revised PAs 1, 2 and 3. A detailed description of the proposed Modified Project is provided in Section

3.2. To implement the GRRSPA and BPI Development, the project Applicant proposes a General Plan Amendment (GPA), Specific Plan Amendment (SPA), Tentative Tract Map (TTM), and Precise Plan (PP). These discretionary approvals represent the proposed Project, proposed Modified Project, or Modified Project analyzed in this SEIR. These actions are summarized as follows:
• GPA 2020-0002 • SPA 2020-0006
• TTM 37963 • PP 2020-0004
In addition to the proposed changes, the Regional Conservation Agency (RCA) requested that the City apply for a WR-MSHCP Criteria Area Refinement to relocate Proposed Constrained Linkage 1 (PCL-1) from its current alignment to the B Canyon property as the GRRSP Planning Area contains four Criteria Cells (1702, 1704, 1811, and 1812) and PCL-1. The Criteria Cells support PCL-1 that connects Core Area A to the north (Prado Basin/Santa Ana River) with Core Area B to the south (Cleveland National Forest). The RCA recently purchased approximately 670 acres of land adjacent to and west of the GRRSP Planning Area known as the B Canyon property. This property has long been considered a superior location for a wildlife linkage because it removes or reduces the physical barriers at Green River Road, the railroad tracks, and SR-91 associated with the existing alignment of PCL-1. Consequently, the City has agreed to address the proposed Relocation of PCL-1 in this SEIR as a separate but related project. The environmental analysis of the proposed Relocation of PCL-1 is presented in this SEIR on a project level, independent of the Modified Project.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-2

1.2 PROJECT OBJECTIVES
Modified Project
The following project objectives from the previously approved GRRSP EIR remain valid for the proposed Modified Project.
• To provide for the orderly and efficient development of the Green River Ranch property. • To implement the goals, objectives, and policies of the City of Corona General Plan. • To develop land uses which reflect sound economic, market, and financial consideration. • To develop uses which will generate additional revenue for the City of Corona, and establish a strong tax base for the City.
• To provide convenient commercial and industrial services for the community, in addition to similar services for freeway oriented and generated visitors. • To promote organized and well-planned development within the Specific Plan area. • To provide guidance and direction for the future development of this property. • To create an aesthetically pleasing western gateway into the City of Corona.

Relocation of PCL-1
The project objectives for the proposed Relocation of PCL-1 are as follows:
• Improve wildlife linkage between Core Areas A and B by connecting wildlife habitats, between the Santa Ana Mountains, Prado Basin, and Chino Hills. • Establish a superior PCL-1 wildlife corridor due to existing constraints from roads, railroads, SR 91, and development associated with the existing PCL-1 alignment. • Increase overall Covered Habitat as described in the WR-MSHCP through conserving additional lands.

1.3 REQUIRED APPROVALS
The legislative and discretionary actions to be considered by the City as part of the proposed Project include:

Modified Project
• General Plan Amendment No. 2020-0002 (GPA 2020-0002): The Modified Project requires City approval of a GPA to amend the existing GRRSP designations. As discussed in Section 3.2.2, the MU2 designation on approximately 5.5 acres would change to GC.

The current configuration and designation of MU2, GC, ER, and OS-G on 49.31 acres would change to Light Industrial (LI). The current configuration and designation of MU2 and ER on approximately 20.39 acres would change to ER. The configuration and designation of ER on 83.34 acres would change to Open Space.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-3
• Specific Plan Amendment to the GRRSP (SPA 2020-0006): The Modified Project requires City approval of an SPA to amend the existing GRRSP Land Use Plan and the City’s Zoning Map consistent with GRRSPA No. 1. As discussed in Section 3.2.3, the Modified Project would: redesignate 5.5 acres from Mixed Use to General Commercial as part of proposed PA 4; redesignate 49.52 acres of Mixed Use, Hotel/Mixed Use/Office, and General Commercial to BPI as part of proposed PAs 1 through 3; Estate Residential would occur on 20.39 acres within proposed PA 5; Open Space – General would cover

83.34 acres as PA 6; and onsite roadways would be reconfigured to provide a single northsouth oriented access road (Street A), which would connect to Green River Road in the north and provide primary vehicular access to PAs 1, 2, 3, and 5. In addition to amending the land uses, the Modified Project requires City approval of a conceptual grading plan and a conceptual infrastructure plan; amendments to development standards; design Guidelines for site planning, architectural character, landscape architecture, and development phasing, financing, maintenance responsibilities, and administration of the Specific Plan.
• Tentative Tract Map No. 39763 (TTM 37963): The Modified Project requires City approval of a TTM to change the City Zoning Map consistent with GGRSP. As discussed in Section 3.2.4, the Modified Project Site is comprised of Assessor’s Parcel Numbers 101- 180-014; 101-180-015; 101-180-017; 101-180-034; 101-180-035; 101-180-037; 101-180- 038; and 101-190-034. The TTM would subdivide 154.90 acres of the Specific Plan area into nine (9) lots within PAs 1 through 6.
• Precise Plan No. 2020-0004 (PP 2020-004) (pertaining to the industrial park component of the proposed Project in PAs 1, 2 and 3): The Modified Project requires City approval of a PP to approve the final design of the proposed industrial park component of the Project within PAs 1, 2, and 3. As discussed in Section 3.2.5, the PP includes detailed site planning, architectural treatments, landscaping details, and a signage plan for the future construction of five (5) light industrial buildings within the proposed BPI land use designation. The building sizes range from 86,600 square feet to 296,737 resulting in a total of 746,167 square feet. In addition, the PP would include off-site improvements to roads and utilities impacting a total of 12.8 acres.

Relocation of PCL-1
• Relocation of Proposed Constrained Linkage: The proposed Relocation of PCL-1 requires the City, as permittee to the WR-MSHCP, to prepare CEQA documentation and approval of the relocation based on superiority of the proposed alignment in comparison to the alignment of existing PCL-1. This SEIR will be used by RCA, the U.S. Fish and Wildlife Service and California Department of Fish and Wildlife to approve the relocation in their role as Responsible and Trustee agencies.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-4

1.4 PURPOSE OF A SUPPLEMENTAL ENVIRONMENTAL IMPACT
REPORT
The purpose of a Supplemental Environmental Impact Report (SEIR) is to assess the change in the environmental significance conclusions originally reached in a previous Environmental Impact Report (EIR) attributable to either: 1) change in a project; 2) change in the circumstance under which a project is undertaken; or 3) introduction of new information of substantial importance that was not known at the time the previous EIR was certified.

To determine whether a project is eligible for the preparation of an SEIR, the criteria in Section 15162 governing preparation of Subsequent CEQA documents and the additional criteria in Section 15163 governing preparation of Supplemental CEQA documents must be met, as follows:

1. There are no substantial changes associated with the project which require major revisions to the previous EIR due to new significant impacts or a substantial increase in the severity of previously identified significant effects (Section 15162).

2. There are no substantial changes with respect to the circumstances under which the project is undertaken which require major revisions to the previous EIR due to new significant impacts or a substantial increase in the severity of previously identified significant effects (Section 15162).

3. There is no new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified that shows any of the following (Section 15162):
(a) The project will have one or more significant effects not discussed in the previous EIR.
(b) Significant effects previously examined will be substantially more severe than shown in the previous EIR.
(c) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative.
(d) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

4. Only minor additions or changes would be necessary to make the previous EIR adequately apply to the project in the changed situation (Section 15163).

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-5
As stated in Section 15163 of the CEQA Guidelines, the Lead Agency may choose to prepare a Supplemental EIR rather than a Subsequent EIR if:

1. Any of the conditions described in Section 15162 would require the preparation of a subsequent EIR, and

2. Only minor additions or changes would be necessary to make the previous EIR adequately apply to the project in the changed situation.

An SEIR need contain only the information necessary to make the Prior EIR adequate for the Modified Project as revised (Section 15163). Additionally, an SEIR may be circulated in accordance with CEQA Section 15087 by itself without recirculating the Prior EIR. When the Lead Agency decides whether to approve the Modified Project, the decision-making body shall consider the previous EIR as revised by the SEIR. A finding under Section 15091 must be made for each significant effect shown in the previous EIR as revised in the SEIR.

The reason for preparation of this SEIR relates to the first and second conditions (changes in a project; changes in the circumstance under which a project is undertaken) of the four conditions listed above. The project definition contained in the proposed GRRSP Amendment and BPI Development proposal differs from the Approved Project addressed in the previous EIR certified in 2001 for the 165±-acre GRRSP. In addition, development of the GRRSP is affected by the biological resource conservation goals and associated development constraints pursuant to the Western Riverside County Multiple Species Conservation Plan (WR-MSHCP) approved in 2004 after approval of the original Project. The combined affect of the GRRSPA and BPI Development proposal is defined as the Modified Project in this SEIR.

The GRRSP Planning Area is bisected by the existing alignment of Proposed Constrained Linkage 1 (PCL-1) defined in the WR-MSHCP. The Regional Conservation Agency (RCA) recently purchased approximately 670 acres of land adjacent to and west of the GRRSP Planning Area known as the B Canyon property. This property has long been considered a superior location for a wildlife linkage because it removes or reduces the physical barriers at Green River Road, the railroad tracks, and SR-91 associated with the existing alignment of PCL-1. The RCA requested that the City apply for a WR-MSHCP Criteria Area Refinement to relocate PCL-1 from its current alignment to the B Canyon property. Consequently, the City has agreed to address the proposed Relocation of PCL-1 in this SEIR as a separate but related project.

For this reason, this SEIR analyzes each of the two projects. The proposed Modified Project consisting of the GRRSPA and BPI Development proposal is addressed in Section 4. The Proposed Relocation of PCL-1 is addressed in Section 5 as a separate but related project.

Section 2.2 contains a brief summary of the proposed Modified Project. Section 2.3 contains a brief summary of the proposed of the proposed Relocation of PCL-1 Project. The process

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-6
undertaken and the determinations reached by the City governing why this SEIR is being prepared are detailed in Section 2.4.

This SEIR has been prepared by the City in accordance with CEQA and the CEQA Guidelines.

The SEIR will be used by the City, responsible agencies, and the public for the purpose of evaluating the environmental effects associated with the proposed GPA, GRRSPA No. 1, TTM, and PP. The SEIR will also be used by the City, responsible agencies, and the public for the purpose of evaluating the environmental effects associated with the Relocation of PCL-1.

1.5 TECHNICAL STUDIES AND RELATED DOCUMENTS INCORPORATED

BY REFERENCE
This SEIR incorporates by reference several citywide reports and analyses. In addition, technical studies and reports addressing the Modified Project and Relocation of PCL-1 have been used to prepare the applicable analytical sections of the SEIR. These documents are included in SEIR Appendices B through T and include:
• Green River Ranch Visual Impact Analysis, January 8, 2024, T&B Planning (Appendix C)
• Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Air Quality Impact Analysis, June 12, 2024, Urban Crossroads (Appendix D-1) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Health Risk Assessment, June 12, 2024, Urban Crossroads (Appendix D-2) • Biological Technical Report for the Green River Ranch Specific Plan, Revised April 2, 2024, Glenn Lukos Associates, Inc. (Appendix E-1)
• Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis For Impacts to MSHCP Riparian/Riverine Areas Green River Ranch Industrial Project, Revised August 29, 2024, Glenn Lukos Associates, Inc. (Appendix E-2) • Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis Green River Ranch Industrial Project, Revised August 29, 2024, Glenn Lukos Associates, Inc. (Appendix E3)
• A Phase I Cultural Resources Assessment for the Green River Ranch III Project, Revised January 10, 2024, Brian F. Smith and Associates (Appendix F) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Energy Analysis, June 12, 2024, Urban Crossroads (Appendix G)

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-7
• EIR-Level Geotechnical Study Proposed Green River Ranch Business Park Development Southwest of Green River and Dominguez Roads City of Corona, Riverside County, California, August 12, 2020, Petra Geosciences, Inc. (Appendix H1) • Update of EIR-Level Geotechnical Study Proposed Green River Ranch Business Park Development Southwest of Green River and Dominguez Roads City of Corona, Riverside County, California, January 31, 2024, Petra Geosciences, Inc. (Appendix H2) • Paleontological Resource Record Search Update for the Green River Ranch III Project, Revised January 10, 2024, Brian F. Smith and Associates (Appendix H-3) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Greenhouse Gas Analysis, June 12, 2024, Urban Crossroads (Appendix I) • Phase I Environmental Site Assessment Update Assessor’s Parcel Numbers (APNS) 101-180-014, -015, -037 and -038 Corona, Riverside County, California 2882, August 19, 2019, GeoTek, Inc. (Appendix J)
• Preliminary Drainage Report, December 2022, KWC Engineers (Appendix K-1) • Project Specific Water Quality Management Plan, December 12, 2022, KWC Engineers (Appendix K-2)
• Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Noise and Vibration Analysis, June 4, 2024, Urban Crossroads (Appendix L) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Traffic Analysis, June 10, 2024 Urban Crossroads (Appendix M-1) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Vehicle Miles Traveled (VMT) Analysis, June 24, 2024 Urban Crossroads (Appendix M-2) • Sacred Lands File Search, July 9, 2020 (Appendix N)
• Preliminary Wastewater Report Green River Rach Business Park, April 2022, KWC Engineers (Appendix O-1)
• Preliminary Water Report Green River Rach Business Park, November 2021, KWC Engineers (Appendix O-2)
• Water Supply Assessment for the Green River Ranch Business Park, June 2024, Michael Baker International (Appendix O-3)

C I T Y O F C O R O N A
S E P T E M B E R 202 4

D R A F T S U B S E Q U E N T E I R

G R E E N R I V E R R A N C H S P A & B U S I N E S S P A R K I N D U S T R I A L

D E V E L O P M E N T A N D
R E L O C A T I O N O F P C L- 1

EXECUTIVE SUMMARY

ENPLANNERS
1-8
• Fire Protection Plan, Green River Ranch Business Park, April 7, 2023, Herbert A.

Spitzer (Appendix P)
• Criteria Refinement Analysis Relocation of Proposed Constrained Linkage 1, Revised December 12, 2023, Glenn Lukos Associates, Inc. (Appendix Q)

1.6 SCOPING MEETING AND NOTICE OF PREPARATION
The City held a Public Scoping Meeting on September 22, 2022 to solicit agency and public comments on the scope and content of the environmental analysis to be included in the Draft SEIR. Numerous comments were received prior to, during, and after the meeting. The comments are presented in Section

2.0, Table 2-1, along with the location in the SEIR that addresses the issues raised.

The City also distributed a Notice of Preparation (NOP) for a 30-day review period starting August 29, 2022, to solicit agency and public comments on the scope and content of the environmental analysis to be included in the Draft SEIR. Four (4) agency and numerous individual members of the public provided comments on the NOP. The comments are presented in Section 2.0, Table 2-2, along with the location in the SEIR that addresses the issues raised.

Section 15123(b) of the CEQA Guidelines requires that an EIR identify areas of controversy and issues to be resolved. The areas of controversy and issues to be resolved by the lead agency include whether and how to mitigate the significant effects of the proposed project, consideration of the various mitigation measures and alternatives recommended in the Draft SEIR by the City, and whether the discretionary approvals required to implement the proposed Project and its development components should be granted. At this time, there are no areas of controversy and issues to be resolved associated with the proposed Modified Project. Significant and unavoidable impacts have been identified in this SEIR for the proposed Modified Project; therefore, a Statement of Overriding Considerations would be required for the proposed Project. However, the impacts associated with the proposed Project and the level of significance of impacts are similar to those that were previously certified by the City in 2001 For the Approved Project.

1.7 PUBLIC REVIEW PERIOD
The Draft SEIR is being distributed to public agencies and other interested parties for review and comment. The Draft SEIR is also available on the City’s website www.Coronaca.gov and at the following locations:

Corona City Hall Circulation Desk
Planning and Development Department Corona Public Library 400 South Vicentia Avenue 650 South Main Street
Corona, California 92882 Corona, California 92882
Phone: (951) 736-2434 Phone: (951) 736-2381
Hours: Monday through Friday: 8:00 a.m. to 5:00 p.m.

D R A F T S U B S E Q U E N T E I R

G R E E N R I V E R R A N C H S P A & B U S I N E S S P A R K

I N D U S T R I A L D E V E L O P M E N T A N D
R E L O C A T I O N O F P C L- 1

C I T Y O F C O R O N A
S E P T E M B E R 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-9
All comments received from agencies and individuals on the Draft SEIR will be accepted during the public review period, which will not be less than 45 days, in compliance with CEQA. All comments on the Draft SEIR should be sent to the following City contact person:

Sandra Vanian, Planning Manager
City of Corona
Planning and Development Department
400 S. Vicentia Avenue
Corona, California 92882
Following the close of the public review period, the City will prepare responses to all comments and will compile these comments and responses into a Final SEIR. All responses to comments submitted on the Draft SEIR by public agencies during the CEQA comment period will be provided to those agencies at least 10 days prior to final action on the proposed Modified Project and proposed Relocation of PCL-1. The City will make findings regarding the extent and nature of the impacts as presented in the Final SEIR. The Final SEIR will need to be certified as complete by the City Council prior to making a decision to approve or deny the Modified Project (i.e., the GPA, SPA, TTM, and PP) and Relocation of PCL-1. Public input is encouraged at all public hearings (e.g., Planning and Housing Commission, City Council) regarding approval of the proposed Projects.

The Draft SEIR is being distributed to public agencies and other interested parties for review and comment. The Draft SEIR is also available at the following locations and on the City’s website:

Corona City Hall Circulation Desk
Planning & Development Department Corona Public Library 400 South Vicentia Avenue 650 South Main Street
Corona, California 92882 Corona, California 92882
Phone: (951) 736-2434 Phone: (951) 736-2381
Hours: Monday through Friday: 8:00 a.m. to 5:00 p.m. www.Coronaca.gov All comments received from agencies and individuals on the Draft SEIR will be accepted during the public review period, which will not be less than 45 days, in compliance with CEQA. All comments on the Draft SEIR should be sent to the City contact person at the address listed above.

Following the close of the public review period, the City will prepare responses to all comments and will compile these comments and responses into a Final SEIR. All responses to comments submitted on the Draft SEIR by public agencies during the CEQA comment period will be provided to those agencies at least 10 days prior to final action on the Modified Project.

The City will make findings regarding the extent and nature of the impacts as presented in the

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-10
will be provided to those agencies at least 10 days prior to final action on the Modified Project.

The City will make findings regarding the extent and nature of the impacts as presented in the Final SEIR. The Final SEIR will need to be certified as complete by the City Council prior to making a decision to approve or deny the Modified Project (i.e., the GPA, SPA, TTM, and PP.

Public input is encouraged at all public hearings (e.g., Planning and Housing Commission, City Council) regarding the proposed Modified Project before the City.

1.8 SUMMARY OF PROJECT ALTERNATIVES
Section 15126.6 of the CEQA Guidelines identifies the parameters within which consideration and discussion of alternatives to the proposed Project should occur. As stated in this section of the guidelines, alternatives must focus on those that are reasonably feasible and that attain most of the basic objectives of the proposed Project. Each alternative should be capable of avoiding or substantially lessening any significant effects of the proposed Project. The rationale for selecting the alternatives to be evaluated and a discussion of the No Project Alternative are also required, per Section 15126.6.

As presented in Section 6.0 of this SEIR, the proposed PCL-1 Realignment proposed PCL-1 alignment is an environmentally superior alternative and the need to conduct an Alternative analysis would be pointless and therefore not necessary. For these reasons, the Alternatives considered in Section 6.0 of this SEIR focuses on Alternatives to the proposed Modified Project as follows:
• Alternative 1: No Project/No Build Alternative: Under this Alternative, the undeveloped site would remain vacant and unoccupied. No further modification of topography or disturbance of existing biological, cultural, paleontological, or visual resources would be required. This Alternative would dramatically reduce the number of daily vehicle trips in the vicinity of the Project site, resulting in a corresponding reduction in construction and operational emissions, and noise. This Alternative would neither alter existing geologic and hydrologic conditions nor require the implementation of mitigation to reduce potential impacts associated with these issues.

The No Project/No Build Alternative by definition would not meet the objectives of the Modified Project that were discussed earlier in this chapter. Therefore, this Alternative is rejected.
• Alternative 2: Mixed Use Alternative: Under this Alternative, PA 1 through 5 and PA 7 would be developed for mixed (commercial and industrial) use purposes only per the existing GRRSP design guidelines. This Alternative would require a specific plan amendment. Under the Mixed Use Alternative, the Project site would be developed with less intensity of commercial and industrial uses in PAs 1, 2, 3, 4, 5, and 7 while

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-11
PA 6 would remain undeveloped for residential uses. This Alternative would achieve the stated objectives of the existing GRRSP, however it would not meet all the basic goals of the proposed GRRSP (i.e., Modified Project).
• Alternative 3: Residential Alternative: Under this Alternative, development of the Project site would be residential uses only per the existing GRRSP. PA 6 would be developed as stated in the Specific Plan with 32 single-family residential units on lots minimally sized at 3.0 acres each. The northern portion of the Project site would be developed with single-family residential units at a density of 2 dwelling units per acre, resulting in 139 dwellings. Thus, implementation of this Alternative would result in the development of 171 single-family dwelling units on the Project site. Under this Alternative, the Project site would be developed with single-family dwelling units and designated open space. This Alternative would not achieve the basic stated objectives of the Green River Ranch Specific Plan and is, therefore, rejected.

1.9 SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION

MEASURES
Table 1-1, Summary of Environmental Impacts and Mitigation Measures, provides a summary of the impact analysis related to the proposed Modified Project. The table identifies a summary of the significant environmental impacts resulting from the Modified Project pursuant to the CEQA Guidelines Section 15123(b)(1). For more detailed discussion, please see each subsection in Section 4.0 of this document. Table 1-1 also lists the applicable mitigation measures related to identified significant impacts and the level of significance after mitigation is identified. Also, the significance of impacts of the Modified Project compared to the approved Project is provided.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-12
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-13
Table 1-1 - Summary of Impacts, Mitigation Measures, and Level of Significance after Mitigation Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Aesthetics
Threshold AES-1: Scenic
Vistas
Less than
Significant
N/A N/A Equal
Threshold AES-2: Scenic
Highways
Less than
Significant
N/A N/A Equal
Threshold AES-3: Visual
Character
Less than
Significant
N/A N/A Equal
Threshold AES-4: Light and
Glare
Potentially
Significant

4.6.1M: Sources of lighting within the Specific Plan area should be limited to the minimum standard to ensure safe circulation and visibility.

4.6.1N: Street lighting should be limited to intersections and other locations needed to maintain safe access (e.g., sharp curves).

4.6.1O: Exterior lighting for buildings should be of a low profile and intensity.

Less than
Significant
Equal
Cumulative Significant Implement MMs 4.6.1M through 4.6.1O Similar Agricultural and Forestry Resources
Threshold AGF-1: Convert
Prime Farmland to Non-Ag
Use
Less than
Significant
N/A N/A Equal
Threshold AGF-2: Conflict
with Ag Zoning or Williamson
Act Contract
Less than
Significant
N/A N/A Equal
Threshold AGF-3: Conflict
with Forestry Zoning
Less than
Significant
N/A N/A Equal
Threshold AGF-4: Loss of
Forestry Land
Less than
Significant
N/A N/A Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-14
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Threshold AGF-5: Other
Changes Resulting in Loss of
Farmland or Forestry Land
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Air Quality
Threshold AQ-1: Conflict with
or Obstruct an Air Quality Plan
P
Potentially
Significant
AQ-1: During grading of Planning Areas 1, 2, and 3, all Construction Contractors shall ensure that offroad diesel construction equipment complies with Environmental Protection Agency (EPA)/CARB Tier 4 Interim emissions standards or equivalent and shall ensure that all construction equipment is tuned and maintained in accordance with the manufacturer’s specifications.

AQ-2: Legible, durable, weather-proof signs shall be placed at truck access gates, loading docks, and truck parking areas that identify applicable CARB anti-idling regulations. At a minimum, each sign shall include: 1) instructions for truck drivers to shut off engines when not in use; 2) instructions for drivers of diesel trucks to restrict idling to no more than five (5) minutes once the vehicle is stopped, the transmission is set to "neutral" or "park," and the parking brake is engaged; and 3) telephone numbers of the building facilities manager and the CARB to report violations. Prior to the issuance of a certificate of occupancy, the Lead Agency (City of Corona) shall conduct a site inspection to ensure that the signs are in place.

AQ-3: Prior to tenant occupancy for Planning Areas 1, 2 and 3, the Project Applicants or successors in interest shall provide documentation to the Lead Agency (City of Corona) demonstrating that occupants/tenants of the Project site have been provided documentation on funding opportunities, such as the Carl Moyer Program, that provide incentives for using cleaner-than-required engines and equipment.

Significant and
Unavoidable
Increased

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-15
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
AQ-4: The minimum number of automobile electric vehicle (EV) charging stations required by the California Code of Regulations (CCR) Title 24 shall be provided. Final designs of Project buildings shall include electrical infrastructure sufficiently sized to accommodate the potential installation of additional auto and truck EV charging stations.

Threshold AQ-2: Result in
Cumulatively Considerable Net
Increase in any Criteria
Pollutant
Potentially
Significant
Implement MM AQ-1 through AQ-4 Significant and
Unavoidable
Equal
Threshold AQ-3: Expose
sensitive receptors to pollution
Less than
Significant
Implement MM AQ-1 N/A Equal
Threshold AQ-4: Other
Emissions Affecting People
Less than
Significant
N/A N/A Equal
Cumulative Significant Implement MM AQ-1 through AQ-4 Significant and Unavoidable
Equal
Biological Resources
Threshold BIO-1: Candidate,
Non-listed Sensitive, or
Special-Status Species
Potentially
Significant

4.7.1A: Mitigation for impacts to the California gnatcatcher shall consist of acquiring and preserving California gnatcatcher habitat of equal or greater quality at a minimum replacement ratio of 1:1 (acquire at least 1 acre for each acre impacted). The Modified Project would impact 8 acres of habitat used by the California gnatcatcher; therefore, mitigation shall consist of the acquisition and preservation of at least 8 acres of occupied habitat. The acquired habitat shall be in a location that facilitates management for the species (i.e., currently supports the species and is contiguous with a larger area that will be managed for conservation of the species). Potential suitable locations include areas adjacent to existing reserves (such as Stephens’ kangaroo rat reserves) or within established mitigation banks for the California gnatcatcher.

Less than
Significant
Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-16
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Project impacts to the California gnatcatcher and its designated critical habitat will require consultation or other permitting for compliance with the federal ESA that may result in requirements for additional mitigation measures beyond those described above..

4.7.3A: Prior to the commencement of tree removal or grading on the proposed project site during the nesting season (March-July), all suitable habitat shall be thoroughly surveyed for the presence of nesting birds by a qualified biologist. If any active nests are detected, the area shall be flagged and avoided until the nesting cycle is complete. In addition, a biologist shall be present on site to monitor the tree removal and grading to ensure that any nests detected during the initial survey are not disturbed. .

4.7.3B: Alternative) Tree removal and grading shall be delayed until after the nesting season (March-July)..

BIO-1: If the Crotch bumble bee is still a Candidate species or has been confirmed as a State listed species at the time of Modified Project site disturbance, then prior to the issuance of a grading permit that would remove Crotch bumble bee habitat the following measures shall be implemented:
• The Project proponent shall have conveyed or have an agreement to convey approximately 50.96 acres of various scrub habitats and 26 acres of non-native grassland in the southern portion of the Project site to the RCA, which constitutes avoidance of suitable habitat. • If the land to be conserved in the southern portion of the Project site has not been conveyed to the RCA and no agreement is yet in place to convey the property, the Project proponent shall coordinate with CDFW to address the extent of impacts and determine whether an Incidental Take Permit (ITP) for Crotch bumble bee would be required. If an ITP were required, then mitigation may be required by

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-17
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
CDFW as part of the ITP process, and the conservation of the comparable open space habitat would be presented to support the ITP.

Threshold BIO-2: Riparian
Habitat or Other Sensitive
Natural Communities
Potentially
Significant

4.7.2A: All riparian habitat impacted (i.e., removed) by the proposed project shall be replaced through creation of new riparian habitat of equal or greater quality. Impacts to 3.66 acres of CDFW jurisdiction (including

2.10 acres of potential Corps/RWQCB jurisdiction) shall be mitigated at a 3:1 ratio (10.98 acres) through the combination of onsite restoration and preservation, and offsite mitigation (Riverpark Mitigation Bank). The onsite mitigation will consist of the restoration of 2.57 acres of riparian oak woodland and the preservation of 6.36 acres of oak woodlands and streams.

The balance of mitigation would consist of 4.62 acres would be purchased at a Mitigation bank.

It is anticipated that project construction will require permits or approvals from the CDFW (per Section 1601/1603 of the Fish and Game Code), RWQCB (per Section 401 of the federal Clean Water Act), and Corps (per Section 404 of the federal Clean Water Act).

Less than
Significant
Equal
Threshold BIO-3:

Jurisdictional Waters/
Wetlands
Potentially
Significant
Implement MM 4.7.2A Less than
Significant
Equal
Threshold BIO-4: Wildlife
Movement and Migratory
Species
Potentially
Significant
Implement MM 4.7.3A through MM 4.73B Less than
Significant
Equal
Threshold BIO-5: Adopted
Policies and/or Ordinances
Potentially
Significant

4.7.4A: Prior to issuance of grading permits for PA 1, 2, 3, and 5, and 6, the project shall comply with the City’s Hillside Development Overlay Ordinance. This mitigation was previously introduced as mitigation measure 4.6-1. This Ordinance promotes the use of residential clustering techniques and their measures to minimize impacts on hillside sites, typically areas containing oak trees. Home sites shall be clustered into the fewest number of acres possible to minimize the spread of impacts over a Less than
Significant
Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-18
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
large portion of the property to reduce fragmentation of the remaining natural areas.

4.7.4B: Prior to issuance of grading permits for PAs 1, 2, 3, and 5, and 6, the applicant shall design an oak woodland management plan which includes the following:
• Provisions for ongoing maintenance, management, and construction impact practices for all oaks on site.
• Provisions for enhancing oak woodlands not within the development zone.
• Provisions for limiting human and vehicular access to existing oak woodland areas in order to preserve habitat quality.
• Limitations on the use of herbicides or pesticides within the oak woodland areas.

4.7.4C: Prior to grading within PAs 1, 2, 3, and 5, and 6, the applicant shall conduct a revised Tree Survey, based on the staking of the specific limits of grading, to assess opportunities for transplanting the oak trees.

4.7.4D: Prior to issuance of building permits within PAs 1, 2, 3, and 5, and 6, a qualified native plant horticulturist shall determine the sensibility and likelihood of survival of transplanting 10 percent of the oak trees.

4.7.4E: Prior to certification of occupancy, the applicant shall replant 15- gallon size oaks at a ratio of 10 to 1 for all oaks lost but not transplanted.

The location and methods for these plantings would be specified by a qualified native plant biologist/horticulturist.MM 4.7.4E.

Threshold BIO-6: Adopted
habitat Conservation Plans
Potentially
Significant
Implement MM 4.7.2A Less than
Significant
Equal
Cumulative Potentially
Significant
Implement MMs 4.7.1A, 4.7.2A, 4.7.3A, 4.7.3B, 4.7.4A, 4.7.4B, 4.7.4C,

4.7.4D, 4.7.4E, and MM BIO-1
Less than
Significant
Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-19
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Cultural Resources
Threshold CUL-1: Adverse
change in the significance of a
historical resource
Less than
Significant
N/A N/A Equal
Threshold CUL-2: Adverse
change in significance of an
archaeological resource
Potentially
Significant
CUL-1: Mitigation Monitoring and Reporting Program (MMRP) - As a condition of project approval, a MMRP is recommended to identify any cultural resources that may be uncovered during grading, and subsequently, to mitigate potential impacts to any discovered archaeological resources evaluated as significant. This program shall include, but not be limited to, the following actions:
1) Prior to issuance of a grading permit, the applicant shall provide written verification in the form of a letter from the project archaeologist to the lead agency stating that a certified archaeologist has been retained to implement the monitoring program.
2) The project applicant shall provide Native American monitoring during grading when the archaeological monitor identifies undisturbed soil or Native American artifacts. The Native American monitor shall work in concert with the archaeological monitor to observe ground disturbances and search for cultural materials when the potential exists to encounter prehistoric artifacts. 3) The certified archaeologist shall attend the pre-grading meeting with the contractors to explain and coordinate the requirements of the monitoring program.
4) During the cutting of previously undisturbed deposits, the archaeological monitor(s) shall be on-site, as determined by the consulting archaeologist, to perform periodic inspections of the excavations. The frequency of inspections will depend upon the rate of excavation, the materials excavated, and the presence and abundance of artifacts and features. The consulting archaeologist shall have the authority to modify the monitoring program if the potential for cultural resources appears to be less than anticipated.

Less than
Significant
Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-20
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
5) Isolates and clearly non-significant deposits will be minimally documented in the field so the monitored grading can proceed. 6) In the event that previously unidentified cultural resources are discovered, the archaeologist shall have the authority to divert or temporarily halt ground disturbance operation in the area of discovery to allow for the evaluation of potentially significant cultural resources.

The archaeologist shall contact the lead agency at the time of discovery. The archaeologist, in consultation with the lead agency, shall determine the significance of the discovered resources. The lead agency must concur with the evaluation before construction activities will be allowed to resume in the affected area. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the lead agency before being carried out using professional archaeological methods. If any human bones are discovered, the county coroner and lead agency shall be contacted. In the event that the remains are determined to be of Native American origin, the Most Likely Descendant (MLD), as identified by the NAHC, shall be contacted in order to determine proper treatment and disposition of the remains.
7) Before construction activities are allowed to resume in the affected area, the artifacts shall be recovered and features recorded using professional archaeological methods. The project archaeologist shall determine the amount of material to be recovered for an adequate artifact sample for analysis.
8) All cultural material collected during the grading monitoring program shall be processed and curated according to the current professional repository standards. The collections and associated records shall be transferred, including title, to an appropriate curation facility, to be accompanied by payment of the fees necessary for permanent curation.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-21
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
9) A report documenting the field and analysis results and interpreting the artifact and research data within the research context shall be completed and submitted to the satisfaction of the lead agency prior to the issuance of any building permits. The report will include DPR Primary and Archaeological Site Forms.

Threshold CUL-3: Disturb
human remains
Potentially
Significant
CUL-2: Human Remains - If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to Public Resource Code Section 5097.98(b), remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission (NAHC) shall be contacted within the period specified by law (24 hours). Subsequently, the NAHC shall identify the "most likely descendant." The most likely descendant shall then make recommendations and engage in consultation concerning the treatment of the remains as provided in Public Resources Code Section 5097.98.

Less than
Significant
Equal
Cumulative Less than
Significant
N/A N/A Equal
Energy
Threshold EN-1: Wasteful,
inefficient, unnecessary
consumption of energy
Less than
Significant
N/A N/A Equal
Threshold EN-2: Conflict with
or obstruct a state or local plan
for renewable energy or energy
efficiency
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Geology / Soils

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-22
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Threshold GEO-1: Fault
Rupture
Less than
Significant
N/A N/A Equal
GEO-2: Strong seismic ground
shaking
Less than
Significant
N/A N/A Equal
Threshold GEO-3: SeismicRelated Ground FailureLess than Significant
N/A N/A Equal
Threshold GEO-4: Landslides Less than
Significant
N/A N/A Equal
Threshold GEO-5: Soil Erosion
or Loss of Topsoil
Less than
Significant
N/A N/A Equal
Threshold GEO-6: Unstable
Soils
Less than
Significant
N/A N/A Equal
Threshold GEO-7: Expansive
Soils
Less than
Significant
N/A N/A Equal
Threshold GEO-8: Septic
Tanks
Less than
Significant
N/A N/A Equal
Threshold GEO-9: Destroy
paleontological resource
Potentially
Significant
PAL-1: 1) Monitoring of mass grading and excavation activities in areas identified as likely to contain paleontological resources by a qualified paleontologist or paleontological monitor. Full time monitoring of grading or excavation activities should be performed starting from the surface in undisturbed areas of very old Quaternary (middle to early Pleistocene) alluvial fan deposits, and the Tertiary-aged Sespe, Vaqueros, Santiago, and Silverado formations within the project. Paleontological monitors will be equipped to salvage fossils as they are unearthed to avoid construction delays and to remove samples of sediments that are likely to contain the remains of small fossil invertebrates and vertebrates. The monitor must be empowered to temporarily halt or divert equipment to allow for the removal of abundant or large specimens in a timely manner. Monitoring may be reduced if the potentially fossiliferous units are not present in the subsurface, or if present, are determined upon exposure and examination Less than
Significant
Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-23
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
by qualified paleontological personnel to have a low potential to contain or yield fossil resources.
2) Paleontological salvage during trenching and boring activities is typically from the generated spoils and does not delay the trenching or drilling activities. Fossils are collected and placed in cardboard flats or plastic buckets and identified by field number, collector, and date collected.

Notes are taken on the map location and stratigraphy of the site, and the site is photographed before it is vacated and the fossils are removed to a safe place. On mass grading projects, any discovered fossil site is protected by red flagging to prevent it from being overrun by earthmovers (scrapers) before salvage begins. Fossils are collected in a similar manner, with notes and photographs being taken before removing the fossils. Precise location of the site is determined with the use of handheld Global Positioning System units. If the site involves a large terrestrial vertebrate, such as large bone(s) or a mammoth tusk, that is/are too large to be easily removed by a single monitor, Brian F. Smith and Associates, Inc. (BFSA) will send a fossil recovery crew in to excavate around the find, encase the find within a plaster jacket, and remove it after the plaster is set. For large fossils, use of the contractor’s construction equipment is solicited to help remove the jacket to a safe location before it is returned to the BFSA laboratory facility for preparation.
3) Particularly small invertebrate fossils typically represent multiple specimens of a limited number of organisms, and a scientifically suitable sample can be obtained from one to several five-gallon buckets of fossiliferous sediment. If it is possible to dry screen the sediment in the field, a concentrated sample may consist of one or two buckets of material.

For vertebrate fossils, the test is usually the observed presence of small pieces of bones within the sediments. If present, as many as 20 to 40 fivegallon buckets of sediment can be collected and returned to a separate

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-24
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
facility to wet-screen the sediment. In the laboratory, individual fossils are cleaned of extraneous matrix, any breaks are repaired, and the specimen, if needed, is stabilized by soaking in an archivally approved acrylic hardener (e.g., a solution of acetone and Paraloid B-72).
4) Preparation of recovered specimens to a point of identification and permanent preservation, including screen washing sediments to recover small invertebrates and vertebrates, if necessary. Preparation of individual vertebrate fossils is often more time-consuming than for accumulations of invertebrate fossils.
5) Identification and curation of specimens into a professional, accredited public museum repository with a commitment to archival conservation and permanent retrievable storage (e.g., the Western Science Center, 2345 Searl Parkway, Hemet, California 92543). The paleontological program should include a written repository agreement prior to the initiation of mitigation activities.
6) Preparation of a final monitoring and mitigation report of findings and significance, including lists of all fossils recovered and necessary maps and graphics to accurately record their original location. The report, when submitted to the appropriate lead agency (City of Corona), will signify satisfactory completion of the project program to mitigate impacts to any paleontological resources.
7) Decisions regarding the intensity of the MMRP will be made by the project paleontologist based upon the significance of the potential paleontological resources and their biostratigraphic, biochronologic, paleoecologic, taphonomic, and taxonomic attributes, not upon the ability of a project proponent to fund the MMRP.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-25
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Cumulative Potentially
Significant
Implement MM PAL-1 Less than
Significant
Equal
Greenhouse Gas Emissions
Threshold GHG-1: Generate
direct or indirect greenhouse
gas emissions
Potentially
Significant
GHG-1: Prior to issuance of a building permit for each increment of development in the GRRSP, the Project applicant shall provide documentation to the City of Corona Building Division demonstrating that the improvements and/or buildings subject to a building permit application include the measures from the CAP GHG Emissions Screening Tables (Appendix C to the CAP), as needed to achieve a minimum of 100 points for both the residential and non-residential portions of the Project.

Alternatively, specific measures may be substituted for other measures that achieve an equivalent amount of GHG reduction, subject to City of Corona Building Division review.

Less than
Significant
Equal
Threshold GHG-2: Conflict
with a plan, policy, or
regulation adopted to reduce
greenhouse gas emissions
Potentially
Significant
Implement MM GHG-1 Less than
Significant
Equal
Cumulative Potentially
Significant
Implement MM GHG-1 Less than
Significant
Equal
Hazards & Hazardous Materials
Threshold HAZ-1: Routine
Transport, use, or Disposal of
Hazardous Materials
Less than
Significant
N/A N/A Equal
Threshold HAZ-2: Reasonably
Foreseeable Upset and
Accident Conditions
Less than
Significant
N/A N/A Equal
Threshold HAZ-3: Emit
Hazards Near Existing or
Proposed School
Less than
Significant
N/A N/A Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-26
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Threshold HAZ-4: Located on
a Listed Hazardous Materials
Site
Potentially
Significant
HAZ-1: Prior to issuance of a demolition permit for each phase of development requiring demolition and removal of onsite structures, the Project applicant shall provide documentation to the City of Corona Building Division demonstrating that the improvements and/or buildings subject to a demolition permit application include survey testing for asbestos-containing materials (ACM) and lead-based paints (LBP) in accordance with existing federal and state regulations.

Less than
Significant
Equal
Threshold HAZ-5: Within an
Airport Land Use Plan or
Within Two Miles of a Public
Airport
Less than
Significant
N/A N/A Equal
Threshold HAZ-6: Conflict
with Emergency Response
Plans
Less than
Significant
N/A N/A Equal
Threshold HAZ-7: Wildland
Fire Risks
See Wildfire N/A N/A N/A
Cumulative Potentially
Significant
Implement MM HAZ-1 Less than
Significant
Equal
Hydrology / Water Quality
Threshold HYD-1: Violate any
water quality standards or waste
discharge requirements
Potentially
Significant

4.11.1A: The project applicant shall obtain all required permits and clearances from the Corps, the RWQCB, and the CDFG prior to the disturbance of any existing drainage.

4.11.1.B: Drainage facilities within engineered slopes/fills shall be designed and installed in accordance with the City of Corona standards.

4.11.2.A: All proposed storm drain facilities and equipment shall be designed, installed and maintained in a manner to convey peak flows estimated for the project. Drainage plans shall be submitted to the City for review and approval prior to the issuance of grading permits.

Less than
Significant
Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-27
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project

4.11.2B: On-site detention basins shall be constructed to accommodate storm flows from the project site. Such facilities shall be designed, installed and maintained in a manner to reduce on-site runoff to a level that can be accommodated by the existing culverts beneath Green River Road. All required drainage structures shall be designed, installed, and maintained in accordance with applicable City of Corona standards.

4.11.3A: The construction and/or grading contractor shall establish and implement a construction Storm Water Pollution Prevention Plan (SWPPP) and post-construction Water Quality Management Plan (WQMP) in accordance with NPDES permit issued by the Santa Ana RWQCB.

4.11.3.B: In accordance with issuance of a NPDES permit, the construction and/or grading contractor shall establish and implement specific Best Management Practices (BMP) at time of project implementation.

Construction erosion and sediment control plans shall be submitted to the City for review and approval prior to the issuance of grading permits.

BMPs to minimize erosion and/or sedimentation impacts shall include (but not be limited to) the following:

Collection of runoff entering developing areas into surface and subsurface drains for removal to nearby drainages.
• Capture of runoff above steep slopes or poorly vegetated areas and convey-ance to nearby drainages.
• Conveyance of runoff generated on paved or covered areas via drains and swales to natural drainage courses.
• Revegetation of disturbed areas and vegetation of non-disturbed but highly erosive areas.
• Use of drought tolerant plants and irrigation systems which minimize runoff.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-28
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
• Use of other erosion control devices such as rip-rap, gabions, concrete lining, small check dams, etc. to reduce erosion in gullies and active stream channels.
• During the time that on-site soils are exposed, the soil surface shall be approximately 2 feet below the surrounding grade. Any storm water falling on exposed soils will infiltrate on site.
• To the maximum extent possible, on-site vegetation shall be maintained.
• Limit grading disturbance to essential project area.
• Limit grading activities during the rainy season.
• Balance and limit, to the extent possible, the amount of cut and fill. • Water entering and exiting the site shall be diverted through the placement of interceptor trenches or other erosion control devices. • Water shall be sprayed on disturbed areas to limit dust generation. • The construction entrance shall be stabilized to reduce tracking onto adjacent streets.
• Dikes, drains, swales or other features shall be used to divert and/or redirect runoff.

4.11.3.D: Manufactured slopes shall be revegetated to help ensure stability.

Revegetation plans shall be submitted to the City for review and approval prior to the issuance of grading permits. Plant selection shall comply with the Plant Palette contained in Section 4.3.6 of the Green River Ranch Specific Plan.

4.11.4A: Development within the Specific Plan area shall comply with applicable provisions of the NPDES permit and the applicable standards and regulations of responsible agencies.

Threshold HYD-2:

Substantially decrease
groundwater supplies or
Less than
Significant
N/A N/A Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-29
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
interfere substantially with
groundwater recharge
Threshold HYD-3:

Substantially Alter Drainage
Resulting in Erosion or
Siltation Offsite
Less than
Significant

4.11.3A: The construction and/or grading contractor shall establish and implement a construction Storm Water Pollution Prevention Plan (SWPPP) and post-construction Water Quality Management Plan (WQMP) in accordance with NPDES permit issued by the Santa Ana RWQCB.

HYD-1: Erosion of existing natural downstream canyons and hillsides will be mitigated by properly designed grading, detention basins, energy dissipators and erosion protection rip-rap pads at the outlet of storm drain system.

Less than
Significant
Equal
Threshold HYD-4: Alter
Drainage or Increase of Surface
Runoff Resulting in Flooding
On- or Off-site
Potentially
Significant
Implement MM 4.11.2A. Less than
Significant
Equal
Threshold HYD-5: Runoff
Exceeding Capacity of Existing
or Planned Facilities
Less than
Significant
N/A N/A Equal
Threshold HYD-6: Impede or
Redirect Flood Flows
Potentially
Significant
Implement MM 4.11.2A. Less than
Significant
Equal
Threshold HYD-7: Inundation
by Seiche, Tsunami, or
Mudflow
Less than
Significant
N/A N/A Equal
Threshold HYD-8: Conflict
with or obstruct
implementation of a water
quality control plan or
sustainable groundwater
management plan
Less than
Significant
N/A N/A Equal
Cumulative Potentially
Significant
Implement MMs 4.11.1A, 4.11.1.B, 4.11.2.A, 4.11.2B, 4.11.3A, 4.11.3.B,

4.11.3.C, 4.11.3.D, 4.11.4A, 4.11.4B, and HYD-1.

Less than
Significant
Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-30
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Land Use and Planning
Threshold LU-1: Physically
divide an established
community
Less than
Significant
N/A N/A Equal
Threshold LU-2: Conflict with
any land use plan, policy, or
regulation adopted for the
purpose of avoiding or
mitigating an environmental
effect
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Minerals
Threshold MIN-1: Loss of
regionally important minerals
resources
Less than
Significant
N/A N/A Equal
Threshold MIN-2: Loss of
locally important minerals
resources
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Noise
Threshold N-1: Temporary or
permanent ambient noise in
excess of established standards
Less than
Significant
N/A N/A Equal
Threshold N-2: Excessive
groundborne vibration or
groundborne noise levels
Less than
Significant
N/A N/A Equal
Threshold N-3: Exposure to
Excessive Noise from Public or
Private Airport
Less than
Significant
N/A N/A Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-31
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Cumulative Less than
Significant
N/A N/A Equal
Population and Housing
Threshold POP-1: Induce
Substantial Unplanned
Population Growth
Less than
Significant
N/A N/A Equal
Threshold POP-2: Displace
Substantial Numbers of
existing People or Housing
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Public Services
Threshold PUB-1: Impacts
from Construction of New or
Renovated Fire Protection
Facilities
Less than
Significant
N/A N/A Equal
Threshold PUB-2: Impacts
from Construction of New or
Renovated Police Protection
Facilities
Less than
Significant
N/A N/A Equal
Threshold PUB-3: Impacts
from Construction of New or
Renovated School Facilities
Less than
Significant
N/A N/A Equal
Threshold PUB-4: Impacts
from Construction of New or
Renovated Park Facilities
Less than
Significant
N/A N/A Equal
Threshold PUB-5: Impacts
from Construction of New or
Renovated Other Public
Facilities
Less than
Significant
N/A N/A Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-32
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Cumulative Less than
Significant
N/A N/A Equal
Recreation
Threshold REC-1: Existing
Recreational and Park Facilities
Less than
Significant
N/A N/A Equal
Threshold REC-2: New or
Physically Altered Recreation
and Park Facilities
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Transportation
Threshold TRA-1: Conflict
with applicable circulation
system program, plan,
ordinance, or policy.

Less than
Significant
N/A N/A Equal
Threshold TRA-2: Conflict or
be inconsistent with CEQA
Guidelines section 15064.3,
subdivision (b)
Potentially
Significant

4.17.1: Prior to the issuance of building permits for the BPI Development in PA 1, 2 and 3 and the Estate Residential uses in PA 5, separate Transportation Demand Management (TDM) Plans shall be prepared to reduce project VMT. Applicable trip reduction strategies may include but are not limited to the following:
• Implement voluntary local hiring programs.
• Mark preferred parking spaces for vanpools and carpools. • Provide on-site secured bike parking facilities.
• Provide information on carpooling and vanpooling opportunities to employees.
• Provide an on-site message board in each building or other comparable system to encourage and provide information about public transit, carpooling, and vanpooling, and carpool and vanpool ridematching services.

Significant and
Unavoidable
Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-33
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
The TDM Plan shall include an estimate of the vehicle trip reduction anticipated for each strategy proposed based on published research such as California Air Pollution Control Officers Association (CAPCOA), Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (December 2021) (CAPCOA Handbook).

Threshold TRA-3: Hazards
Due to Design Features or
Incompatible Uses
Less than
Significant
N/A N/A Equal
Threshold TRA-4: Inadequate
Emergency Access
Less than
Significant
N/A N/A Equal
Cumulative Potentially
Significant
Implement MM 4.17.1 Significant and
Unavoidable
Equal
Tribal Cultural Resources
Threshold TCR-1: Impacts to
Listed or Eligible Tribal
Cultural Resources
Potentially
Significant
Implement MM CUL-1
TCR-1: Retain a Native American Monitor Prior to Commencement of Ground-Disturbing Activities.

A. The Project applicant/lead agency shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation. The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations(i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, such as public improvement work). “Ground-disturbing activity” shall include, but is not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal, boring, grading, excavation, drilling, and trenching.

Less than
Significant
Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-34
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
B. A copy of the executed monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity.

C. The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of ground-disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe.

Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs will be provided to the project applicant/lead agency upon written request to the Tribe.

D. On-site tribal monitoring shall conclude upon the latter of the following (1) written confirmation to the Kizh from a designated point of contact for the project applicant/lead agency that all grounddisturbing activities and phases that may involve ground-disturbing activities on the project site or in connection with the project are complete; or (2) a determination and written notification by the Kizh to the project applicant/lead agency that no future, planned construction activity and/or development/construction phase at the project site possesses the potential to impact Kizh TCRs.

E. Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the Kizh monitor and/or Kizh archaeologist.

The Kizh will recover and retain all discovered TCRs in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-35
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.

TCR-2: Unanticipated Discovery of Human Remains and Associated Funerary Objects.

A. Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute.

B. If Native American human remains and/or grave goods discovered or recognized on the project site, then all construction activities shall immediately cease. Health and Safety Code Section 7050.5 dictates that any discoveries of human skeletal material shall be immediately reported to the County Coroner and all ground-disturbing activities shall immediately halt and shall remain halted until the coroner has determined the nature of the remains. If the coroner recognizes the human remains to be those of a Native American or has reason to believe they are Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission, and Public Resources Code Section 5097.98 shall be followed.

C. Human remains and grave/burial goods shall be treated alike per California Public Resources Code section 5097.98(d)(1) and (2).

D. Construction activities may resume in other parts of the project site at a minimum of 200 feet away from discovered human remains and/or burial goods, if the Kizh determines in its sole discretion that resuming construction activities at that distance is acceptable and provides the project manager express consent of that determination (along with any other mitigation measures the Kizh monitor and/or archaeologist deems necessary). (CEQA Guidelines Section 15064.5(f).)

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-36
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
E. Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods. Any historic archaeological material that is not Native American in origin (non-TCR) shall be curated at a public, non-profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County or the Fowler Museum, if such an institution agrees to accept the material. If no institution accepts the archaeological material, it shall be offered to a local school or historical society in the area for educational purposes.

F. Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance.

MM TCR-3: Procedures for Burials and Funerary Remains.

A. As the Most Likely Descendant (“MLD”), the Koo-nas-gna Burial Policy shall be implemented. To the Tribe, the term “human remains” encompasses more than human bones. In ancient as well as historic times, Tribal Traditions included, but were not limited to, the preparation of the soil for burial, the burial of funerary objects with the deceased, and the ceremonial burning of human remains.

B. If the discovery of human remains includes four or more burials, the discovery location shall be treated as a cemetery and a separate treatment plan shall be created.

C. The prepared soil and cremation soils are to be treated in the same manner as bone fragments that remain intact. Associated funerary objects are objects that, as part of the death rite or ceremony of a culture, are reasonably believed to have been placed with individual human remains either at the time of death or later; other items made exclusively for burial purposes or to contain human remains can also be considered as associated funerary objects. Cremations will either be removed in bulk or by means as necessary to ensure complete recovery of all sacred materials.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-37
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
D. In the case where discovered human remains cannot be fully documented and recovered on the same day, the remains will be covered with muslin cloth and a steel plate that can be moved by heavy equipment placed over the excavation opening to protect the remains.

If this type of steel plate is not available, a 24-hour guard should be posted outside of working hours. The Tribe will make every effort to recommend diverting the project and keeping the remains in situ and protected. If the project cannot be diverted, it may be determined that burials will be removed.

E. In the event preservation in place is not possible despite good faith efforts by the project applicant/developer and/or landowner, before ground-disturbing activities may resume on the project site, the landowner shall arrange a designated site location within the footprint of the project for the respectful reburial of the human remains and/or ceremonial objects.

F. Each occurrence of human remains and associated funerary objects will be stored using opaque cloth bags. All human remains, funerary objects, sacred objects and objects of cultural patrimony will be removed to a secure container on site if possible. These items should be retained and reburied within six months of recovery. The site of reburial/repatriation shall be on the project site but at a location agreed upon between the Tribe and the landowner at a site to be protected in perpetuity. There shall be no publicity regarding any cultural materials recovered.

G. The Tribe will work closely with the project’s qualified archaeologist to ensure that the excavation is treated carefully, ethically and respectfully. If data recovery is approved by the Tribe, documentation shall be prepared and shall include (at a minimum) detailed descriptive notes and sketches. All data recovery data recovery-related forms of documentation shall be approved in advance by the Tribe. If any data recovery is performed, once complete, a final report shall be submitted

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-38
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
to the Tribe and the NAHC. The Tribe does NOT authorize any scientific study or the utilization of any invasive and/or destructive diagnostics on human remains.

Threshold TCR-2: Impacts to
Lead Agency Defined Tribal
Cultural Resources
Potentially
Significant
Implement MMs CUL-1, TCR-1, TCR-2, and TCR-3 Less than
Significant
Equal
Cumulative Potentially
Significant
Implement MMs CUL-1, TCR-1, TCR-2, and TCR-3 Less than
Significant
Equal
Utilities / Service Systems
Threshold UTL-1: Impacts
from Relocation or
New/Expanded Utilities?
Less than
Significant
N/A N/A Equal
Threshold UTL-2: Sufficient
Water Supplies
Less than
Significant
N/A N/A Equal
Threshold UTL-3: Wastewater
Treatment Capacity
Less than
Significant
N/A N/A Equal
Threshold UTL-4: Exceed
Solid Waste Capacities or
Impair Solid Waste Reduction
Goals
Less than
Significant
N/A N/A Equal
Threshold UTL-5: Solid Waste
Regulations
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal
Wildfire
Threshold FIRE-1: Impair
Emergency Response or
Evacuation plan
Less than
Significant
N/A N/A Equal

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

EXECUTIVE SUMMARY

ENPLANNERS
1-39
Topic Impact Before
Mitigation
Mitigation Measure(s) Level of
Significance
After
Mitigation
Significance
Compared to
Approved
Project
Threshold FIRE-2: Expose
Project Occupants to Wildfire
Pollution or Uncontrolled
Wildfire Spread
Less than
Significant
N/A N/A Equal
Threshold FIRE-3: Install or
Maintain Infrastructure that
would Exacerbate Fire Risk or
Result in Impacts to the
Environment
Less than
Significant
N/A N/A Equal
Threshold FIRE-4: Expose
People or Structures to
Flooding or Landslide Risks
from Runoff, Post-Fire Slope
Instability, or Drainage
Changes
Less than
Significant
N/A N/A Equal
Cumulative Less than
Significant
N/A N/A Equal

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK INDUSTRIAL DEVELOPMENT AND RELOCATION OF PCL - 1

EXECUTIVE SUMMARY

ENPLANNERS
1-40
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-1

2.0 INTRODUCTION

2.1 PURPOSE OF THIS SUBSEQUENT ENVIRONMENTAL IMPACT
REPORT
The objective of a Subsequent Environmental Impact Report (SEIR) is to supplement a previously approved Environmental Impact Report (EIR) with additional analysis necessary to address a project in its modified form. To accomplish this objective, an SEIR assesses the changes in the environmental significance conclusions originally reached in a previous EIR attributable to either: 1) changes in a project; 2) changes in the circumstance under which a project is undertaken; or 3) introduction of new information of substantial importance that was not known at the time the previous EIR was certified. The reason for preparation of this SEIR relates to the first and second conditions. The project definition contained in the proposed Green River Ranch Specific Plan (GRRSP) Amendment and Business Park Industrial development proposal differs from the Project approved as part of the previous EIR certified in 2001 for the 165±-acre GRRSP. In addition, development of the GRRSP is affected by the biological resource conservation goals and associated development constraints pursuant to the Western Riverside County Multiple Species Conservation Plan (WR-MSHCP) approved in 2004 after approval of the original Project.

The Project Applicant proposes to Amend the GRRSP to modify land uses and rearrange Planning Areas. The proposed GRRSP Amendment (GRRSPA) would create Business Park Industrial (BPI) Planning Areas that are proposed for development. The combined affect of the GRRSPA and BPI development proposal is defined as the Modified Project in this SEIR.

The GRRSP Planning Area is bisected by the existing alignment of Proposed Constrained Linkage 1 (PCL-1) defined in the WR-MSHCP. The Regional Conservation Agency (RCA) recently purchased approximately 670 acres of land adjacent to and west of the GRRSP Planning Area known as the B Canyon property. This property has long been considered a superior location for a wildlife linkage because it removes or reduces the physical barriers at Green River Road, the railroad tracks, and SR-91 associated with the existing alignment of PCL-1. The RCA requested that the City apply for a WR-MSHCP Criteria Area Refinement to relocate PCL-1 from its current alignment to the B Canyon property. Consequently, the City has agreed to address the proposed Relocation of PCL-1 in this SEIR as a separate but related project.

For this reason, this SEIR analyzes each of the two projects. The proposed Modified Project consisting of the GRRSPA and BPI Development proposal is addressed in Section 4. The Proposed Relocation of PCL-1 is addressed in Section 5.

Section 2.2 contains a brief summary of the proposed Modified Project. Section 2.3 contains a brief summary of the proposed of the proposed Relocation of PCL-1 Project. The process

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-2
undertaken and the determinations reached by the City governing why this SEIR is being prepared are detailed in Section 2.4.

2.2 PROPOSED MODIFIED PROJECT
The Project Applicant, PSIP WR Green River, LLC, seeks approval of Amendment No. 1 to the GRRSP to rearrange and change the previously approved land uses, slightly expand the Specific Plan boundary, and designate a large portion of the site as open space for permanent preservation to compliance with the WR-MSHCP. Concurrent with the proposed GRRSPA, the Project Applicant requests entitlements for development of the BPI Planning Areas located in revised Planning Areas 1, 2 and 3. A detailed description of the proposed Modified Project is provided in Section 3.2.

To implement the GRRSPA and BPI development, the project Applicant proposes a General Plan Amendment (GPA), Specific Plan Amendment (SPA), Tentative Tract Map (TTM), and Precise Plan (PP). These discretionary approvals represent the proposed Project, proposed Modified Project, or Modified Project analyzed in this SEIR. These actions are summarized as follows:
• GPA 2020-0002 • SPA 2020-0006
• TTM 37963 • PP 2020-0004

2.3 PROPOSED RELOCATION OF PCL-1
The WR-MSHCP was approved in 2004 after City approval of the GRRSP in 2001. The WRMSHCP identifies areas of habitat within Western Riverside County that shall be conserved to ensure the long-term survivability of the covered species contained in the plan. The habitat areas located on private property are identified by criteria cells, core areas consisting of groups of criteria cells, and wildlife corridors linking core areas. Some of the wildlife corridors are constrained by existing development and are defined as a Proposed Constrained Linkage (PCL). Through conservation of the areas identified for each criteria cell, core area, and wildlife corridor in combination with public open space in government control, the long-term survival of covered species would be obtained.

The GRRSP Planning Area contains four Criteria Cells (1702, 1704, 1811, and 1812) and PCL1. The Criteria Cells support PCL-1 that connects Core Area A to the north (Prado Basin/Santa Ana River) with Core Area B to the south (Cleveland National Forest). Proposed Constrained Linkage 2 (PCL-2) is located further to the east, and both PCL-1 and PCL-2 are intended to connect Core Areas A and B.

Since approval of the WR-MCHCP, discussions regarding the planned location of PCL-1 have occurred because of several known constraints associated with the planned alignment. Most recently in 2016, a Criteria Refinement analysis for the relocation of PCL-1 was submitted to

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-3
the RCA but not approved. The City, RCA, and the U.S. Fish and Wildlife Service and California Department of Fish and Wildlife generally agree relocation of PCL-1 to a superior alignment would better meet the conservation goals of the WR-MSCHP. To this end, RCA recently purchased the property known as B Canyon for the purposes of relocating PCL-1. At the request of RCA, the City proposes to relocate PCL-1 to this alternate location known as the B Canyon property. The property is located west of its current alignment and west of and adjacent to the GRRSP Planning Area. All other interested parties agree it would better serve the objectives of the MSHCP in the proposed relocated alignment. The Project Applicant who has proposed the GRRSPA and BPI Development has agreed to include environmental analysis of the proposed PCL-1 relocation in this SEIR as a separate but related project because it would remove any impediments to development otherwise created by the existing alignment of PCL1 through the GRRSP Planning Area. For this reason, the SEIR analyzes the Modified Project (GRRSPA and BPI Development Project) first followed by analysis of the proposed Relocation of PCL-1. A detailed description of these proposed Relocation of PCL-1 Project is provided in Section 3.3.

2.4 BASIS FOR AND INTENDED USE OF THIS SUBSEQUENT EIR
Basis for this Subsequent EIR
To determine whether the Modified Project is eligible for the preparation of an SEIR, the criteria in Section 15162 governing preparation of Subsequent CEQA documents must be met.

This section states no SEIR shall be prepared unless one or more of the following conditions is present:
• Substantial changes are proposed in the Modified Project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
• Substantial changes occur with respect to the circumstances under which the Modified Project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or • New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
o The Modified Project will have one or more significant effects not discussed in the previous EIR;

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-4
o Significant effects previously examined will be substantially more severe than shown in the previous EIR;
o Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the Modified Project, but the project proponents decline to adopt the mitigation measure or alternative; or
o Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

The City has determined that a SEIR is the appropriate environmental document for the Modified Project because all of the conditions in Section 15162 regarding preparation of a SEIR can be met. An SEIR may be circulated in accordance with CEQA Section 15087 by itself without recirculating the previous EIR. When the Lead Agency decides whether to approve the Modified Project, the decision-making body shall consider the previous EIR as revised by the SEIR. A finding under Section 15091 must be made for each significant effect shown in the previous EIR as revised in the SEIR.

Because this SEIR addresses two (2) separate but related projects, when referenced together they are referred to as either: 1) proposed Projects, or 2) proposed Modified Project and proposed Relocation of PCL-1 Project.

Intended Use of this Subsequent EIR
CEQA and the CEQA Guidelines establish the City as the Lead Agency, which is defined in CEQA Guidelines Section 15367 as “the public agency which has the principal responsibility for carrying out or approving a project.” The City has determined that the proposed Project meets the CEQA definition of a project. The City has determined that the proposed Project is not exempt from CEQA, approval of a Negative Declaration (ND) or Mitigated Negative Declaration (MND) is not appropriate, and preparation of an EIR as supplemented by this SEIR is the appropriate environmental document.

This SEIR has been prepared by the City in accordance with CEQA and the CEQA Guidelines.

The SEIR will be used by the City, responsible agencies, and the public for the purpose of evaluating the environmental effects associated with the proposed GPA, GRRSPA No. 1, TTM, and PP. The SEIR will also be used by the City, responsible agencies, and the public for the purpose of evaluating the environmental effects associated with the Relocation of PCL-1.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-5

2.5 CONTENT AND ORGANIZATION OF THIS SUBSEQUENT EIR
Technical Studies and Reference Documents
This SEIR incorporates by reference several citywide reports and analyses. In addition, technical studies and reports addressing the Modified Project and Relocation of PCL-1 have been used to prepare the applicable analytical sections of the SEIR. These documents are included in SEIR Appendices B through T and include:
• Green River Ranch Visual Impact Analysis, January 8, 2024, T&B Planning (Appendix C) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Air Quality Impact Analysis, June 12, 2024, Urban Crossroads (Appendix D-1) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Health Risk Assessment, June 12, 2024, Urban Crossroads (Appendix D-2) • Biological Technical Report for the Green River Ranch Specific Plan, Revised April 2, 2024, Glenn Lukos Associates, Inc. (Appendix E-1)
• Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis For Impacts to MSHCP Riparian/Riverine Areas Green River Ranch Industrial Project, Revised August 29, 2024, Glenn Lukos Associates, Inc. (Appendix E-2) • Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis Green River Ranch Industrial Project, Revised August 29, 2024, Glenn Lukos Associates, Inc. (Appendix E-3)
• A Phase I Cultural Resources Assessment for the Green River Ranch III Project, Revised January 10, 2024, Brian F. Smith and Associates (Appendix F) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Energy Analysis, June 12, 2024, Urban Crossroads (Appendix G)
• EIR-Level Geotechnical Study Proposed Green River Ranch Business Park Development Southwest of Green River And Dominguez Roads City Of Corona, Riverside County, California, August 12, 2020, Petra Geosciences, Inc. (Appendix H-1) • Update of EIR-Level Geotechnical Study Proposed Green River Ranch Business Park Development Southwest of Green River And Dominguez Roads City Of Corona, Riverside County, California, January 31, 2024, Petra Geosciences, Inc. (Appendix H-2) • Paleontological Resource Record Search Update for the Green River Ranch III Project, Revised January 10, 2024, Brian F. Smith and Associates (Appendix H-3)

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-6
• Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Greenhouse Gas Analysis, June 12, 2024, Urban Crossroads (Appendix I) • Phase I Environmental Site Assessment Update Assessor’s Parcel Numbers (APNS) 101- 180-014, -015, -037 And -038 Corona, Riverside County, California 2882, August 19, 2019, GeoTek, Inc. (Appendix J)
• Preliminary Drainage Report, December 2022, KWC Engineers (Appendix K-1) • Project Specific Water Quality Management Plan, Revised December 16, 2022, KWC Engineers (Appendix K-2)
• Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Noise and Vibration Analysis, June 4, 2024, Urban Crossroads (Appendix L) • Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Traffic Analysis, June 10, 2024 Urban Crossroads (Appendix M-1) • Green River Ranch Specific Plan Amendment Vehicle Miles Traveled (VMT) Analysis, June 24, 2024, Urban Crossroads (Appendix M-2)
• Sacred Lands File Search, July 9, 2020 (Appendix N)
• Preliminary Wastewater Report, April 2022, KWC Engineers (Appendix O-1) • Preliminary Water Report, November 2021, KWC Engineers (Appendix O-2) • Water Supply Assessment For The Green River Ranch Business Park, June 5, 2024, Michael Baker International (Appendix O-3)
• Fire Protection Plan, Green River Ranch Business Park, August 5, 2020 (Revised April 7, 2023), Herbert A. Spitzer (Appendix P)
• Criteria Refinement Analysis Relocation of Proposed Constrained Linkage 1, Revised December 12, 2023, Glenn Lukos Associates, Inc. (Appendix Q) Organization of this Subsequent EIR
The SEIR is organized into the following chapters.
• Chapter 1, Executive Summary, presents an overview of the proposed Modified Project and Relocation of PCL-1; a summary of the alternatives considered as modified to reflect the Modified Project and alternatives to the Relocation of PCL-1; a discussion of known areas of controversy; and a listing of the impacts and mitigation measures in a tabular format, including the significance of impacts before and after proposed mitigation measures.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-7
• Chapter 2, Introduction, explains the purpose of this SEIR; summarizes the proposed Project; discloses the basis for and the purpose of this SEIR; outlines the organization and scope of the document; lists the lead, responsible, and trustee agencies with discretionary authority over the proposed Project; and provides information on public participation.
• Chapter 3, Project Description, provides background on the Modified Project and Relocation of PCL-1; identifies the Modified Project and Relocation of PCL-1 objectives; lists the applicable regulatory requirements; and describes the proposed facilities and activities, affected areas, and operational characteristics of the Modified Project and Relocation of PCL-1.
• Chapter 4, Modified Project Environmental Impact Analysis contains analysis of the environmental impacts associated with the Modified Project and is divided into 20 sections. Section 4.0 introduces the chapter and explains the approach to the environmental analysis of the GRRSP Amendment and Business Park Industrial Development Project. Each of the remaining 20 sections is devoted to a particular topic area and describes the updated environmental setting (the baseline, or existing conditions) and regulatory setting. Following the setting information, each section presents a summary of impacts associated with the Project as originally approved and an analysis of impacts that would result from construction and operation of the proposed Modified Project. Each section identifies mitigation measures that would avoid or eliminate significant impacts or reduce them to less-than-significant and compares the significance of each impact to the significance as concluded in the prior EIR.
• Chapter 5, Relocation of PCL-1 Project Environmental Impact Analysis contains analysis of the Relocation of PCL-1.
• Chapter 6, Alternatives Analysis, contains a discussion of alternatives to development of the proposed Modified Project.
• Chapter 7, Other CEQA-Required Analyses, identifies the growth-inducing impacts, and significant and unavoidable impacts of implementing the proposed Modified Project.
• Chapter 8, Updated Mitigation Monitoring and Reporting Program, includes the updated Mitigation Monitoring and Reporting Program resulting from the analysis of impacts contained in this SEIR.
• Chapter 9, References, provides information about the published documents and other, unpublished information (personal communications) cited in this SEIR.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-8
• Chapter 10, List of Preparers, includes a list of the key individuals who participated in preparing this SEIR.
• Technical Appendices present the background information that supports the SEIR.

2.6 LEAD AGENCY CONTACT INFORMATION
The Lead Agency for the proposed Projects is the City of Corona. The contact person for the Lead Agency is:

Sandra Vanian, Planning Manager
City of Corona
Planning and Development Department
400 S. Vicentia Avenue
Corona, California 92882

2.7 PUBLIC SCOPING MEETING
A public scoping meeting was held on September 22, 2022. The numerous comments received in relation to the public scoping meeting (including prior to, during, and after the meeting) are shown below in Table 2-1 as well as the location in the SEIR that addresses the issues raised.

The comments received in relation to the public scoping meeting are included in Appendix A.

Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
Resident
Jeffrey Meissner
[email protected]
Jeffrey Meissner provided the
following comments related to the
Project:
• Confirm Mixed Use Zoning
includes Light Industrial.
• The Project’s BPI would introduce
significant impacts related to
Noise and Public Services (e.g.
traffic and homeless related
crime).
• The Project’s 750,000 SF BPI is
inherently significant in size and
operation.

Section 4.13 Noise
Section 4.15 Public Services
Section 4.17 Transportation
Section 3.0 Project Description
Section 4.11 Land Use and
Planning

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-9
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
Resident
Dwight Woodward
[email protected]
Dwight Woodward provided the
following comment related to the
Project:
• Would the Project provide an offstreet bike trail along Green River?
Section 4.16 Recreation
Section 4.17 Transportation
Resident
Bruce Fields
[email protected]
Bruce Fields provided the following
comments related to the Project:
• The Project would increase traffic
levels in an area where existing
traffic related conditions at the
Dominguez Ranch/Green River
intersection are already significant.

Does the City propose to improve
existing roads by installing more
signals?
• The Project would increase the
need for Public Safety due to
wildfire and crime.
• The Project would increase
impacts in the residential area as it
relates to Wildfire and Noise.
• What is the City’s response to the
potential impacts to surrounding
property values due to
development of the industrial
park?
• What are the impacts related to
biological resources when
development occurs on vacant
land. Where will the wildlife go?
Section 4.17 Transportation
Section 4.20 Wildfire
Section 4.9 Hazards and
Hazardous Materials
Section 4.15 Public Services
Section 4.13 Noise
Section 4.4 Biological
Resources
Resident
Angel Garcia
[email protected]
Angel Garcia provided the following
questions related to the Project:
• I can see an industrial business
going in, but not a hotel.
• Could a conference/multi-purpose
room for community gatherings be
developed?
The City (Sandra Yang)
provided the following direct
response to Angel Garcia’s
email.
• The current project does not
include a hotel. The Project
is amending the existing
Green River Ranch Specific
Plan to move the hotel use

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-10
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
from the south side of Green
River Road to the parcel that
is located on the north side
of Green River Road.

Someone would have to
submit an application to
propose a hotel. Right now,
the city does not have an
application to develop the
area north of Green River
Road.

Resident
Diana Reuss
Robert Reuss
[email protected]
Diana and Robert Reuss provided the
following comments related to the
Project:
• The Project would increase traffic
flow on Green River, 91 Freeway
and surrounding areas. There are
already considerable wait times
contribute to that already overly
congested situation.
• Who is the proposed tenant for the
Project? There are already
numerous empty business facilities
in the area similar to the
businesses being proposed for this
project.
• The Project would increase
impacts on available resources.
• Development of the Project would
negatively impact the quality of
life in the Sierra del Oro area.

Section 3.0 Project Description
Section 4.17 Transportation
Resident
Jeanmarie Martinez
[email protected]
Jeanmarie Martinez provided the
following comments related to the
Project:
• The Project would increase traffic
related impacts in area with
existing significant related traffic
delays.
• The Project would increase crime
and noise in the area.

Section 4.17 Transportation
Section 4.15 Public Services
Section 4.13 Noise

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-11
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
Resident
Mike Serle
[email protected]
Mike Serle provided the following
comments related to the Project:
• The Project would severely affect
traffic in the area, specifically the
neighborhoods adjacent to Green
River Road and Foothill
Boulevard.

Section 4.17 Transportation
Resident
Tom Pavelich
[email protected]
Tom Pavelich provided the following
comments related to the Project:
• The Project Industrial uses for the
site (with the potential for more
than 746k square feet of industrial
warehouses) will have significant
negative impact on the Traffic in
the area, specifically as it relates to
the Green River on/off ramps to
the 91 Freeway.
• We ask that any traffic studies
relied upon by the Developer be
re-done, ensuring that traffic
studies are conducted during times
when schools are in session and
not on a break (elementary,
middle, high and University),
would object to any traffic studies
conducted since March 2020,
since COVID-related traffic was
reduced during those times. It is
only until only recently that we
have seen traffic in the area begin
to return to its pre-COVID levels.

Section 4.17 Transportation
Resident
Francesca Da Sacco
[email protected]
Francesca Da Sacco provided the
following comments related to the
Project:
• The Project would destroy the
existing scenic landscape.
• The Project would add to the
existing traffic issues in the area
and current infrastructure can’t
handle this development.

Section 4.1 Aesthetics
Section 4.15 Public Services
Section 4.13 Utilities and
Service Systems

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-12
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
• The Project would create a lot of
environmental impacts and create
a major change to the area.
• The City bought land near the
Skyline Trail to protect the City’s
landscape, this Project would
cause such an impact to the City’s
entrance.
• Current infrastructure cannot
support the Project.

Resident
Julie Ackman
[email protected]
Julie Ackman provided the following
comments related to the Project:
• Development of the proposed
industrial buildings might increase
crime and safety concerns in the
area.
• The Project would increase traffic
levels in an area where existing
traffic congestion is already
significant. Does the City propose
to improve existing roads by
installing more signals?
• The Sierra Del Oro area has little
to no services, it would be
fantastic to have additional
restaurant and shopping services.
• We need to keep the integrity of
the gorgeous land intact.

Section 3.0 Project Description
Section 4.1 Aesthetics
Section 4.11 Land Use and
Planning
Section 4.15 Public Services
Section 4.17 Transportation
Resident
Heather Upstone
1631 San Almada Road
Corona, CA 92882
Cell: 714-469-8331
Heather Upstone provided the
following comments related to the
Project:
• Expressed concern regarding
rezoning of the area into an
industrial busines park as it would
highly and negatively impact the
local community.
• Stated the project would result in a
drastic change from the original
and agreed upon plan that was
envisioned as a development
Section 3.0 Project Description
Section 4.1 Biological
Resources
Section 4.11 Land Use and
Planning
Section 4.17 Transportation

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-13
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
project that would benefit the local
community with sit down
restaurants and a hotel.
• The rezoning would create a
nuisance to the locals including
introduction of large big rig
trucks, overcrowding an already
congested commute
• The project would affect more of
our local wildlife. .

Resident
Bill Lemoine
[email protected]
Heather Upstone provided the
following comments related to the
Project:
• Stated that the state can't “keep the
light” on and questions how will
adding the proposed project help?
• Stated there is already a water
shortage and this project will only
make things worse.
• States we are tired of current
traffic which only got worse once
Foothill was finished. Cars and
trucks speed on Green River Road
and we never see police presence.

How is adding more trucks and
cars going to improve things?
• Pollution from the big rigs a huge
concern and will the park be open
24-7?
• Stated nothing should start until
road improvements are done, not
after the project is completed.
• Stated: instead of 80 acres they
should set aside at least 150 acres
so nothing can be accessed behind
/ adjacent to this property for
future development.
• Will the project build roads in
areas no located outside of the
Cleveland National Forest but
further south of the proposed
S Section 3.0 Project
Description
Section 4.4 Biological
Resources
Section 4.11 Land Use and
Planning
Section 4.17 Transportation

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-14
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
buildings.)
• Stated a preference for a nice hotel
with fine dining restaurants.

Resident
Craig Reiter
[email protected]
Craig Reiter provided the following
comments related to the Project:
• Development of the Project site
would impact the entrance to
Corona. It is the first exit from the
Orange Curtain and our "Welcome
to Corona" and we are putting an
Industrial Park.
• The Project area is deprived of
safe family entertainment such as
a theater, grocery store and other
services that are convenient for a
community of this size.
• The Project area does not have
adequate Public Services as the
area is deprived of safe parks and
community areas where people
can get outside and exercise. In
addition, there is not a park in our
community.
• We propose a mixed-use
development with some
commercial, industrial and
residential condos in an outdoor
walking mall environment with a
big "Welcome to Corona" sign to
shows what we are about as a City.
• The City should require the
developer to put in a park and lots
of tree canopies to reduce visual
impacts from development of the
industrial park.

Section 4.1 Aesthetics
Section 3.0 Project Description
Section 4.16 Recreation
Section 4.13 Noise
Section 4.11 Land Use and
Planning

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-15
Table 2-1: Summary of Comments Received in Response to the Public Scoping Meeting Agency / Individual Summary of Comments Response / Section in SEIR Where Issue is Addressed
Resident
Cassandra Stone
[email protected]
Cassandra Stone provided the
following comments related to the
Project:
• Will the Project information from
this be publicly posted online?
• The Project would create visual
impacts to the area and entry into
the City due to the Project’s
development of the industrial
buildings.

Section 4.1 Aesthetics

2.8 NOP PUBLIC REVIEW PERIOD
A notice of preparation (NOP) was distributed to members of the public and public agencies for a 30-day review period starting August 29, 2022. The NOP requested input from recipients regarding the scope and content of the environmental information to be included in the SEIR.

At the conclusion of the review period, four (4) agencies and numerous individual members of the public provided comments on the NOP. A summary of the agency and individual comment letters is shown in Table 2-2 as well as the location in the SEIR that addresses the issues raised.

The NOP and the NOP response letters are included in Appendix A.

Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
South Coast Air Quality
Management District
Sam Wang
[email protected]
(09/28/22)
SCAQMD has provided the following
comments/recommendations:
• Requested a copy of the
SEIR and technical
appendices be sent
directly to SCAQMD.
• The analysis in the
SEIR should use the
CEQA Air Quality
Handbook for guidance
and rely on the
Potential air
quality
impacts are
analyzed in
Section 4.4.

The analysis is
based on an
Air Quality
Analysis (AQ
Analysis)
included in

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-16
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
CalEEMod land use
emissions software.
• Quantify criteria
pollutant emissions and
compare the results to
SCAQMD’s CEQA
regional pollutant
emissions significance
thresholds.
• Calculate localized air
quality impacts and
compare results to
localized significance
thresholds (LSTs).
• Analyze potential
adverse air quality
impacts from all phases
of the project,
including construction
and operations.
• If the project generates
substantial heavy-duty
diesel vehicle trips,
conduct a mobile
source health risk
assessment.

If the project generates significant adverse air quality impacts, alternatives capable of lessening or avoiding the impacts should be considered.

Appendix C.

The AQ
Analysis
includes
analysis using
CalEEMod
and
incorporates
an LST
analysis.

Southern California
Association of Governments
Frank Wen
[email protected]
(09/28/22)
The Southern California Association of Governments
(SCAG) recommends the SEIR compare the Modified
Project’s consistency with the goals and strategies
contained in the 2020-2045 Regional Transportation
Plan/Sustainable Communities Strategies (2020-2045
RTP/SCS). In addition, SCAG offers assistance regarding where to find applicable demographic and growth forecast data and suggestions regarding mitigation measures.

Consistency
with the 2020-
2045
RTP/SCS is
discussed in
Section 4.11.

Because the
Modified
Project is part
of a larger

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-17
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
planning
effort (i.e., the
AHSP) and
the proposed
industrial and
commercial
uses will
bring such
uses and
services into
an area that is
lacking, the
Modified
Project is
consistent
with the 2020-
2045

RTP/SCS
goals and
policies
regarding
location of
land uses to
reduce vehicle
miles
traveled,
reducing
traffic
congestion
and associated
noise and air
quality
impact.

California Department of Fish
and Wildlife
Katrina Rehrer
[email protected]
v
(09/21/22)
CDFW recommends the following information be
provided/assessed within the SEIR:
• An assessment of the
various habitat types
located within the
project footprint and a
Potential
impacts to
biological
resources,
including the
topics raised

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-18
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
map that identifies the
location of each habitat
type.
• A general biological
inventory of the fish,
amphibian, reptile,
bird, and mammal
species present or have
the potential to be
present on the project
site.
• A recent inventory of
rare, threatened,
endangered, or other
sensitive species
located within the
project footprint and
within offsite areas
with the potential to be
affected.
• A recent floristicbased assessment of
special status plants
and natural
communities.
• Information regarding
the regional setting
that is critical to the
assessment of
environmental
impacts.
• A full accounting of all
mitigation/conservatio
n lands within and
adjacent to the project
site.
• A discussion of
potential impacts from
lighting, noise, human
by CDFW, are
discussed in
Section 4.4.

The analysis
in this Section
based on a
Biological
Technical
Report
included in
Appendix H.

The
Biological
Technical
Report also
includes a
MSHCP
Consistency
analysis
(Appendix J),
as suggested
by CDFW. It
is important to
note the
comment
incorrectly
describes the
project site
within the
Stephen’s
Kangaroo Rat
Habitat
Conservation
Plan (SKR
HCP)
boundary. The
project site is
located west
of I-15 and

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-19
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
activity, defensible
space, and wildlifehuman interactions,
including changes to
drainage patterns and
water quality.
• A discussion of
potential indirect
impacts on biological
resources within and
adjacent to the project
footprint.
• An evaluation of
impacts to adjacent
open space lands from
both construction and
long-term operational
and maintenance.
• A cumulative effects
analysis as described
under CEQA
Guidelines Section
15130.
• An analysis of a range
of reasonable project
alternatives.
• CDFW provided
sample mitigation
measures to consider.
• The project is located
within the boundaries
of the MSHCP and
must be evaluated for
consistency.
• The project is located
within the Stephen’s
Kangaroo Rat Habitat
Conservation Plan
not within the
SKR HCP fee
are boundary.

Mitigation
Measures
from the Prior
EIR remain
applicable,
with
modifications,
to the
Modified
Project.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-20
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
(SKR HCP) fee are
boundary.
• The project may be
subject to the Lake and
Streambed Alteration
Program under Section
1602 of the Fish and
Game Code.

Resident
Adam Ruiz
[email protected]
(09/23/22)
Adam Ruiz has Provided the following comments:
• The Project would increase traffic in areas with
preexisting traffic issues from its freeways (CA 91,
CA241, CA71) connecting Los Angeles county,
Orange County, and Riverside county’s traffic in the
first exit going eastbound to green river.
• The Project would increase residential risks of
preexisting wildfire impacts resulting in mudslides
and evacuation impacts.
• The Project would increase the preexisting issue with crime, specifically the homeless in the area causing
fires.
• The Project would eliminate the underdeveloped
Project area which allows for first responders and
forestry fire to use at their disposal as a resource for helping our community.

Section 4.17
Transportatio
n
Section 4.20
Wildfire
Section 4.15
Public
Services
Section 4.20
Wildfire
California Allied for a
Responsible Economy (CARE
CA)
Jeff Modrzejewski
CARE CA provided the following comments and
recommendations for the Project:
• The Project objectives should reflect the fundamental purpose of the Project and not be crafted in a manner
that limits the range of alternatives considered.
• The Project is a ‘speculative’ building. Although
tenant(s) or planned operations are usually unknown
at this stage of development, the DSEIR should reflect
a good faith effort at full disclosure by including as
much information on the nature of operations as can
be reasonably obtained. This is important because
different types of high cube warehouses have different
levels of environmental impacts.

To ensure a conservative analysis, the DSEIR should
Section 3.0
Project
Description
Section 4.3
Air Quality
Section 4.8
Greenhouse
Gas
Emissions

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-21
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
study a reasonable worst-case scenario (i.e., most
impactful), which includes assumptions about the
types of uses so that a broad and diverse range of
environmental impacts are included. Therefore, the
DSEIR should study a combination of the five primary
logistics-type uses at the site,1 including providing
justification and square footage assumed for each use
analyzed to ensure that the unique impacts of each use
(i.e., both truck and vehicular trips, air quality, GHG emissions, public health risk and other environmental
effects) are comprehensively evaluated.
• The Project will have high daily volumes of heavyduty diesel truck traffic and on-site equipment that pollute the air with toxic diesel emissions and expose
nearby communities to air pollution. The City must
make all efforts to minimize air quality effects to the greatest extent possible. A mobile source Health Risk
Assessment (including other emission sources such as
backup generators and on-site diesel-powered
equipment) must be prepared and include both
construction and operational diesel PM emissions and
cancer risk assessment.
• For the Project to mitigate negative public health
effects of industrial operations, the DSEIR should
analyze the impacts of creating a buffer zone between
PA1/ PA3 Business Park Industrial and PA 5
residential zones.
• Project mitigation measures must be effective and
enforceable. Every effort must be made to incorporate
modern technology in the mitigation measures and
MMRP. For example, a requirement that all off-road
equipment and trucks using the site during
construction and operations be zero emission, nearzero emissions or alternative-fueled vehicle would both reduce and/or eliminate air pollution impacts and
CO2 emissions.

Mitigation measures can also include requirements to

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-22
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
install cool roofs to reduce operational energy demand
and solar canopies on the parking lot to generate
energy, electrification of 3 loading docks and
provision of EV charging infrastructure, and measures
to reduce urban heat island effect impacts.

Resident
Robert Schnabel
[email protected]
Robert Schnabel provided the following comments:
• The Project SEIR will need to supply detailed
information regarding traffic and circulation.

Specifically impacts to Green River Rd. and
Dominguez Ranch Rd.
• The Approved Project EIR admitted that the peakhour traffic at the SR 91/ Green River Rd. intersection exceeded the acceptable level of service. There were
references to budgeted improvements by Cal Trans
and the City of Corona and concluded that because of
these future improvements, the level of service at the
SR 91/ Green River intersection would be improved
even with the additional traffic generated by the
proposed development.
• What is the current level of service of peak-hour
traffic at the SR 91/ Green River interchange? Traffic
still routinely backs up beyond Dominguez Ranch Rd
beyond acceptable levels even without any
development in place on the subject site.
• Does the Project call for other signal lights between the ones currently at Dominguez Ranch Rd. and the
SR 91/ Green River Rd. interchange and what effect
will they have on traffic and circulation?
• At peak-hour traffic times, what will be the effect of the fully completed proposed development on
Dominguez Ranch Rd. and Green River Rd.?
Section 4.17
Transportatio
n
Resident
Don Osborne
[email protected]
Don Osborne provided the following comments and
questions related to the Project:
• Zoning should never allow for an Industrial Park (
or...think airport) to be placed in close proximity to an existing residential.
• The proposed 49.52 acre BPI is much larger than the
approved Project Promenade business area. The BPI
Section 3.0
Project
Description
Section 4.13
Noise
Section 4.17
Transportatio

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-23
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
Precise Plan shows the intent of the developer by
skirting any inclusion of PA4 or PA5. The Precise
Business Plan addresses only the 49.52 acres by
showing the 5 concrete Tilt-Up Business Park
Industrial Buildings. Nothing else.
• The applicant states the "Specific Plan already allows the following uses, which are being carried over to the BPI zone. Manufacturing, assembly and fabrication of
goods. Warehouse and distribution.". What are the
approved uses for the area specifically light
Commercial and not Business Industrial?
• What are Project’s impacts related to noise from the
BPI as relates to the proximity to residential receivers? The businesses that generate substantial exterior noise are numerous and once this zoning is approved
(forever) then the local residents are stuck with their new neighbors forever without recourse.

If this amended GGRSP is approved as it is proposed I
can see an injunction and pending lawsuit against the
city being filed on behalf of the local residents.
• Are there adequate electrical services within the grid to support the needs of the Project?
• Are there adequate water services to support the
Project as incoming water pressure drops 8 psi from
10pm to 10am?
• Would the Project result in fire hazard impacts as a
result of the portion of the land between Fresno Rd and PA1 to be designated Open Space General?
• Would the Project have adequate access into the
complex from Green River Rd for trucks
• What is the solution to maximize the RED light time
and minimize the GREEN light time for departing
Dominguez Ranch onto Green River Rd during peak
am/pm hours?
n
Section 4.15
Public
Services
Section 4.20
Wildfire

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-24
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
Resident
Klaus Kraemer
[email protected]
Klaus Kraemer provided the following comment related
to the Project:
• The Project would further increase problematic traffic related impacts in the area.

Section 4.17
Transportatio
n
Riverside County
Transportation Commission
(RCTC)
Tricia Cambell
[email protected]
RCTC provided the following comment and request for
MSHCP compliance:

The Project has not completed its MSHCP compliance.

The Joint Progress Review (JPR) Application will be
placed on hold for comments to be addressed as seen
below in the “Comments Tracking Table” to support
Project consistency with the MSHCP.
• PD-1: Include a discussion regarding whether
maintenance activities associated with the project will be needed for the 2.77-acre wildlife movement path.

Activities including, but are not limited to, weed
abatement, fuel modification, slope maintenance,
fence maintenance, etc. If no maintenance activities
are needed, state that as well. Note that manufactured
slopes and fuel modification zones are not permitted
in the conservation area (i.e., referred to in the
Analysis as “wildlife movement path”).
• PD-2. Include that a Habitat Mitigation and
Monitoring Plan (HMMP) for the restoration of the

2.77-acre wildlife movement path will be prepared. In
addition, this HMMP must be reviewed and approved
by the RCA and Wildlife Agencies.
• PD-3. The Analysis states “An additional 6.35 acres
of land is associated with the Estate Residential area
that will not be graded by the Project but will be
designated as Residentially-Zoned Open Space. This
Residentially-Zoned Open Space is not a part of the
Project.” Although the project can designate the 6.35
acres as “Residentially-Zoned Open Space,” it must
be considered part of the project. Revise all text and
figures to reflect that the 6.35 acres is part of the
project.
• PD-4. Based on the mapping provided, the 6.35 acres
Section 4.4
Biological
Resources

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-25
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
of Residentially-Zone Open Space contains
riparian/riverine features. Based on Sec 6.1.2 of the
MSHCP, if the project proposes to avoid these
features, then a deed restriction or conservation
easement must be place over them. Revise the
Analysis and DBESP to include a discussion
regarding how the project proposes to avoid impacts
to riparian/riverine features within the 6.35-acre open space area. Alternatively, the project 3 can assume
these riparian/riverine feature will be impacted and
then propose mitigation for these impacts in the
DBESP.
• PD-5. Include a discussion regarding the off-site
improvements for Fresno Road and Green River
Road. For example, sidewalks, curb and gutter,
culverts turn lanes, etc. In addition, provide a
discussion regarding how wildlife movement across
Green River Road will not be further impeded by the
proposed improvements.
• PD-7. Provide grading plans for the proposed project. • RA-1. Include a discussion regarding the width of
Proposed Constrained Linkage 1 relative to how the
project proposes to facilitate movement of the
associated Planning Species, which includes
mountain lion and bobcat. In other words, provide
evidence that the proposed 100-foot linkage would
facilitate (i.e., not impede) movement of Planning
Species. Although the project will not impede
Reserve Assembly “acreage” goals for this linkage,
the issue regarding the function of this linkage must
also be addressed.
• RIP/RIV-1. The DBESP needs to include an
Equivalency Analysis to demonstrate that the
project’s proposed mitigation will result in habitat
conditions that are biological equivalent or superior
to the existing conditions. This should be presented as a discussion regarding the functions and values (i.e.,
hydrological regime, flood storage, nutrient retention, sediment trapping and transport, toxicant trapping,

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-26
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
wildlife habitat, and aquatic habitat) of the resources being impacted in comparison to the functions and
values being gained by the proposed mitigation.
• RIP/RIV-2. Include the type of mitigation proposed
(i.e., rehabilitation, re-establishment, or preservation).

Note that the project must provide at least a 1:1
mitigation ratio in the form of re-establishment in
order to prevent no net loss of riparian/riverine
resources. The remainder of the mitigation can
include enhancement or re-establishment.
• RIP/RIV-2. Based on Google Earth Aerials and the
shapefiles provided it appears that the extent of the
riparian/riverine resources are not completely
accounted for. The project depicts segments of
riparian/riverine features that are not connected.

However, on Google Earth these features appear to be
contiguous. Revise the Analysis, DBESP, and
shapefiles to reflect the full extent of riparian/riverine resources on site. Alternately, provide an explanation
to why these features are not fully mapped.
• RIP/RIV-3. According to the Analysis and DBESP
there is no suitable fairy shrimp habitat on the project site. However, based on Google Earth aerials there
appears to be a concrete water basin on the property.

Include a discussion regarding this basin relative to
the potential presence of potential fairy shrimp
habitat.
• PLANT-1. Include whether reference populations
were checked for the narrow endemic and criteria
area plant species surveys.

If so, please provide those details. If the reference
populations were blooming at another location, this
type of comparison may be beneficial in supporting a
conclusion of absence on the project site.
• BUOW-1. Analysis. Include how habitat suitability
for burrowing owl was assessed (e.g., topography,
vegetation, etc.)
• BUOW-2. Due to the presence of suitable habitat,

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-27
Table 2-2: Summary of Comments Received in Response to the NOP Agency / Individual Summary of Comments
Response /
Section in
SEIR Where
Issue is
Addressed
include the follow statement, “A 30-day preconstruction survey for burrowing owls is required prior to initial ground-disturbing activities (e.g.,
vegetation clearing, clearing and grubbing, grading,
tree removal, site watering, equipment staging) to
ensure that no owls have colonized the site in the
days or weeks preceding the ground-disturbing
activities. If burrowing owls have colonized the
project site prior to the initiation of ground-disturbing activities, the project proponent will immediately
inform the Regional Conservation authority (RCA)
and the Wildlife Agencies and will need to coordinate
further with RCA and the Wildlife Agencies,
including the possibility of preparing a Burrowing
Owl Protection and Relocation Plan, prior to
initiating ground disturbance. If ground-disturbing
activities occur, but the site is left undisturbed for
more than 30 days, a pre-construction survey will
again be necessary to ensure that burrowing owl have
not colonized the site since it was last disturbed. If
burrowing owl is found, the same coordination
described above will be necessary.”
• UWIG-1. Include that all fencing plans will be
reviewed and approved by the RCA and Wildlife
Agencies.
• UWIG-2. Include that fencing will be placed along
the western border and along the wildlife movement
path. In addition, include that all fencing proposed
along the wildlife movement path will consist of at
least 8-foot-tall block wall construction.
• UWIG-3. Include that all fuel modification zones will occur entirely within the development footprint. In
addition, fuel modification zones must be depicted on
all applicable figures, and shapefiles must be
provided.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-28

2.9 DRAFT SEIR REVIEW PERIOD
The Draft SEIR is being distributed to public agencies and other interested parties for review and comment. The Draft SEIR is also available on the City’s website www.Coronaca.gov and at the following locations:

Corona City Hall Circulation Desk
Planning & Development Department Corona Public Library 400 South Vicentia Avenue 650 South Main Street
Corona, California 92882 Corona, California 92882
Phone: (951) 736-2434 Phone: (951) 736-2381
Hours: Monday through Friday: 8:00 a.m. to 5:00 p.m.

All comments received from agencies and individuals on the Draft SEIR will be accepted during the public review period, which will not be less than 45 days, in compliance with CEQA. All comments on the Draft SEIR should be sent to the following City contact person:

Sandra Vanian, Planning Manager
City of Corona
Planning & Development Department
400 S. Vicentia Avenue
Corona, California 92882
Following the close of the public review period, the City will prepare responses to all comments and will compile these comments and responses into a Final SEIR. All responses to comments submitted on the Draft SEIR by public agencies during the CEQA comment period will be provided to those agencies at least 10 days prior to final action on the proposed Modified Project and proposed Relocation of PCL-1. The City will make findings regarding the extent and nature of the impacts as presented in the Final SEIR. The Final SEIR will need to be certified as complete by the City Council prior to making a decision to approve or deny the Modified Project (i.e., the GPA, SPA, TTM, and PP and Relocation of PCL-1. Public input is encouraged at all public hearings (e.g., Planning and Housing Commission, City Council) regarding approval of the proposed Projects.

2.10 CUMULATIVE PROJECTS
Because of the nature of individual environmental factors, the cumulative area for every issue addressed in this EIR will not be identical. For example, the cumulative area for air quality impacts (the South Coast Air Basin) is much larger than the cumulative area for public service impacts (the service area of the various service providers.) In determining the cumulative impacts of a proposed Project with other area projects, an EIR may either consider a list of past, present, and probable future projects, or it may consider a

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

INTRODUCTION

ENPLANNERS
2-29
summary of projections method.1 Depending on the topic addressed, this EIR utilizes both methods. The following cumulative project figure presents projects identified by the City in the study area (Figure 2.1). The cumulative project names/locations, land use, and quantities/units for the cumulative projects are also presented in Figure 2.1. The potential exists that several of the projects listed may not be constructed within the reasonably foreseeable future. By including all of the listed projects in the cumulative analysis for the project, this EIR would likely overstate identified cumulative impacts because many of the identified projects may never be built or may not be built at the densities identified. Cumulative projects include commercial, industrial, single-family, and multiple-family residential uses. Figure 2.1 identifies the locations of approved and pending projects within the focused cumulative project area.
1 State CEQA Guidelines, Section 15130(b)(1).

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-30
This Page Intentionally Left Blank
FIGURE 2-1: CUMULATIVE DEVELOPMENT PROJECTS
SOURCE: URBAN CROSSROADS, 2024. PAGE: 2-31

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

INTRODUCTION

ENPLANNERS
2-32
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-1

3.0 PROJECT DESCRIPTION

3.1 PROJECT LOCATION AND SETTING

3.1.1 MODIFIED PROJECT
The proposed Project or Modified Project consists of proposed changes to the Green River Ranch Specific Plan (GRRSP) land uses and GRRSP Planning Area and development of an industrial park in the Planning Areas (PAs) proposed for Business Park Industrial (BPI) uses.

The GRRSP boundary consists of ±160.0-acres located within the western portion of the City, in the County of Riverside, California (Figure 3-1, Regional Location). Regional access to the Planning Area is available from State Route 91 (SR 91) and Green River Road. More specifically, the Planning Area is located south of SR 91, southwest of Dominguez Ranch Road, and southeast of Fresno Road (Figure 3-2, Project Vicinity). Green River Road bisects a small portion of the Planning Area in an east-west alignment. According to the U.S.

Geological Survey (USGS), Black Star Canyon Quadrangle topographic map sheet (7.5- minute series), the Planning Area is located in Sections 30 and 31, Township 3 South, Range 7 West.

Elevations on the proposed Modified Project site (i.e., the GRRSP Planning Area) range from approximately 515 feet above mean sea level (AMSL) to the north beyond Green River Road to approximately 1,800 feet AMSL to the south into the foothills of the Santa Ana Mountains.

The area north of Green River Road is relatively flat and undeveloped, with substantial portions disturbed from prior roadway and railway maintenance and construction staging. The portion of the Modified Project site south of Green River Road is generally undeveloped land with a relatively flat semi-developed area that was previously a horse ranch in the area north of the steep hillsides of the Santa Ana Mountains. The southern property is predominately vegetated with non-native grasses and mixed Chaparral. Steep canyons comprise the southern and southwestern portion of the site, characteristic of the Santa Ana Mountains. These canyons descend to the north and form narrow streambeds which ultimately discharge to pipes and culverts on the south side of Green River Road. Fresno Road is a paved roadway near the western property line.

The northeastern portion of the Modified Project site south of Green River Road consists of various structures associated with a prior horse ranch. These structures include; horse pens; barbed wire and chain link fencing; an asphalt concrete-capped parking lot; a concrete building slab; several mobile homes; a variety of trailers, vehicles, and storage containers; and an unused concrete-lined reservoir and water tank. However, large portions of this area are undeveloped and vegetated with oak trees and mixed chaparral.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-2
This Page Intentionally Left Blank
FIGURE 3-1: REGIONAL LOCATION
SOURCE: T&B PLANNING, INC., 2023. PAGE: 3-3

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-4
This Page Intentionally Left Blank
FIGURE 3-2: PROJECT VICINITY
SOURCE: T&B PLANNING, INC., 2023. PAGE: 3-5

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-6
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-7
The proposed Modified Project’s offsite improvement locations are predominately within the roadways of Green River Road, Dominguez Ranch Road, Fresno Road, and Palisades Drive.

The offsite areas are generally flat, disturbed, and occupied by non-native vegetation.

3.1.2 RELOCATION OF PCL-1
The Modified Project site (i.e., the GRRSP Planning Area) is overlain by four Criteria Cells (1702, 1704, 1811, and 1812) and Proposed Constrained Linkage 1 (PCL-1) defined by the Western Riverside County Multiple Species Habitat Conservation Plan (WR-MSHCP). The Criteria Cells support PCL-1 that connects Core Area A to the north (Prado Basin/Santa Ana River) with Core Area B to the south (Cleveland National Forest). As noted previously in Section 2.0, Introduction, and shown in Figure 3-3 (PCL-1 Alignment), the City proposes to relocate PCL-1 to an alternate location west of its current alignment and west of and adjacent to the GRRSP Planning Area.

The proposed Relocation of PCL-1 runs north to south from the Cleveland National Forest to SR 91. The Relocation of PCL-1 is located on properties known as B Canyon and is approximately 328.30 acres, and consists of the Accessor’s Parcel Numbers (APNs) 101-210- 003, 101-201-004, 101-201-012, 101-201-013, 101-201-015, 101-201-016, 101-201-018, 101- 201-020, 101-201-022, and 101-201-023 that would be added to the WR-MSHCP as Additional Reserve Lands. APN 101-180-036 is also part of the subject property and is already defined as Additional Reserve Lands.

Elevations of the proposed PCL-1 alignment range from approximately 525 feet AMSL at SR 91(west of Fresno Road) in the north to approximately 2,100 AMSL in the south. The northern portion of the PCL-1 alignment is topographically oriented north to south along ridgelines and canyons. The southern portion crosses a series of steep east-west canyons and ridgelines. The proposed PCL-1 is comprised of undeveloped lands heavily vegetated with coastal sage scrub, chaparral, non-native grasslands, coast live oak woodland, and riparian forest, including access roads and canyon routes.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-8
This Page Intentionally Left Blank
LEGEND
FIGURE 3-3: PCL-1 ALIGNMENT
SOURCE: GLENN LUKOS ASSOCIATES, 2024. PAGE: 3-9

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-10
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-11

3.2 MODIFIED PROJECT DEFINITION

3.2.1 MODIFIED PROJECT OVERVIEW
The proposed GRRSP Amendment (GRRSPA) and BPI Development represent the proposed Project or Modified Project under scrutiny in this Subsequent EIR (SEIR). To implement the proposed Project, the Project Applicant, PSIP WR Green River, LLC,seeks approval of several discretionary actions from the City in addition to approval of this SEIR. These actions include approval of a General Plan Amendment (GPA), Specific Plan Amendment (SPA), Tentative Tract Map (TTM), and Precise Plan (PP). Each of these actions, or Project components, are described in the following Sections 3.2.2 through 3.2.5.

The GRRSPA would rearrange and change the previously approved land uses, slightly expand the Specific Plan boundary, and designate a large portion of the site as open space for permanent preservation in compliance with the WR-MSHCP. The proposed reconfigured and changed land uses include 5.5 acres of General Commercial uses on proposed PA 4; ±49.31 acres of Business Park Industrial uses on proposed PAs 1, 2, and 3; up to 32 Estate Residential lots on ±20.39 acres on proposed PA 5; and ±83.34 acres of Open Space General land uses on proposed PA 6.

In addition to the land use changes associated with the GRRSPA, the Project includes proposed entitlement requests that would result in the development of a 746,167 square-foot industrial business park consisting of five industrial buildings on 49.31 acres within proposed PAs 1 (17.16 acres), 2 (17.73 acres) and 3 (14.42 acres) proposed for designation of BPI land uses.

This development represents build out of these PAs.

Consequently, the proposed Project includes: 1) a programmatic component that would change and reconfigure the overall land uses and PAs governed by the GRRSP; and 2) a projectspecific component that would result in the BPI Development consisting of five industrial buildings totaling 746,167 square-feet in PAs 1, 2 and 3. For these reasons, the proposed GRRSPA is evaluated at a programmatic level of detail in this SEIR, while the BPI Development portion of the Project proposed on PAs 1, 2 and 3 is evaluated at a projectspecific level of detail.

Table 3-1 summarizes the Approved Project and Modified Project land use acreages and development quantities by land use type. As shown below, the proposed GRRSPA, or Modified Project, would entail a smaller footprint and less intense development in comparison to the approved GRRSP, or Approved Project. The Approved Project encompasses 167. 8 acres and permits the land use types of Mixed Use (MU) within 59.01 acres, Nonresidential Manufactured Slopes & Public Streets with 27.3 acres, 19,600 sf of General Commercial (GC) uses including hotel on 8.12 acres, and allows up to 32 dwelling units (DUs) on 98.2 acres of Estate Residential (ER) land uses.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-12
Table 3-1: Comparison of the Approved and Modified Project GRRSP Land Uses GRRSP PAs Approved
GRRSPA PAs Modified
Approved Project Modified Project
Acreage
Land Use/
DUs or SF Acreage
Land Use/
DUs or SF
Approved: PAs 1, 2, 3, 4, 5
Modified: PAs 1, 2, 3

53.1 Hotel, Mixed Use1, Office/
150 rooms, 491,300 SF

49.31 Business Park Industrial/
746,167 SF
Approved: PA 7
Modified: PA 4

5.91 Mixed Use1/
10,000 SF

5.5 General Commercial/
19,600 SF
Approved: PA 6
Modified: PA 5

98.2 Estate Residential
/32 DUs

20.39 Estate Residential /
32 DUs
Approved: NA
Modified: PA 5
NA NA

83.34 Open Space
DUs = residential dwelling units SF = commercial building area NA = not applicable 1 Includes a mix of retail, service and support commercial, light industrial, hotel/motel, or office uses and a 150-room hotel.

The Modified Project would encompass 160.00 total acres, thereby reducing the footprint by

7.8 acres. The Modified Project would reconfigure the acreage within the footprint to introduce

83.34 acres of dedicated OS. The Modified Project’s reconfiguration of the acreage would provide 49.31 acres of Light Industrial (LI), thereby reducing the more intense MU land use by 9.7 acres. Although the 19,600 sf of GC uses would be unchanged, the Modified Project would reduce GC acreage by 2.62 acres to 5.5 acres and would eliminate hotel uses. The Modified Project would allow for the same, up to 32 residential DUs, however would reduce the ER land use acreage by 77.81 acres to 20.39 acres. Figure 3-4 below, illustrates the existing and proposed General Plan land use designations.

3.2.2 PROPOSED GENERAL PLAN AMENDMENT
The City of Corona General Plan currently designates the GRRSP Planning Area as Mixed Use: Industrial/Commercial (MU2), General Commercial (GC), and Estate Residential (ER), and designates property along Dominguez Ranch Road that is proposed to be added to the Specific Plan boundary as Open Space – General (OS-G). The proposed GPA, GPA2020-0002, proposes to: i) change the MU2 designation on approximately 5.5 acres located north of Green River Road to GC; ii) change the current configuration and designation of MU2, GC, ER, and OS-G on 49.31 acres south of Green River Road to Light Industrial (LI); iii) change the current configuration and designation of MU2 and ER on approximately 20.39 acres south of the proposed LI areas to ER; and iv) change the configuration and designation of ER on 83.34 acres located south of the proposed ER to Open Space.

FIGURE 3-4: EXISTING AND PROPOSED GENERAL PLAN LAND USE DESIGNATIONS SOURCE: T&B PLANNING, INC., 2024. PAGE: 3-13

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-14
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-15

3.2.3 PROPOSED SPECIFIC PLAN AMENDMENT
The approved GRRSP designates 31.5 acres as Mixed Use, 5.8 acres as Hotel/Mixed Use Office, 5.0 acres as General Commercial, and 98.2 acres as Estate Residential, with the remaining portions of the existing GRRSP Planning Area designated for manufactured slopes and public streets. Consistent with the proposed GPA, the proposed GRRSPA would modify planned land uses within the affected planning area. The proposed GRRSPA, SPA2020-0006, redesignates 5.5 acres located north of Green River Road from Mixed Use to General Commercial as part of proposed PA 4. Additionally, the land uses located south of Green River Road would be redesignated from Mixed Use, Hotel/Mixed Use/Office, and General Commercial to Business Park Industrial (BPI) on 49.31 acres within proposed PAs 1, 2, and 3; Estate Residential would occur on 20.39 acres within proposed PA 5, and Open Space – General would cover 83.34 acres as PA 6, of which 80.77 acres are intended for conveyance to the Riverside Conservation Authority (RCA) for inclusion in the WR-MSHCP Conservation Area. Onsite roadways would occur on 1.46 acres and reconfigured to provide a single northsouth oriented access road (Street A), which would connect to Green River Road in the north and provide primary vehicular access to PAs 1, 2, 3, and 5. Figure 3-5 illustrates the proposed Green River Ranch Specific Plan land use designations.

In addition to amending the land uses, SPA2020-0006 proposes a conceptual grading plan and a conceptual infrastructure plan; amendments to development standards to govern future development of the GRRSP Planning Area; and includes design guidelines for site planning, architectural character, and landscape architecture to guide the intended character of future development as well as the proposed Business Park Industrial development in PAs 1, 2, and 3.

SPA2020-0006 also includes an implementation chapter that would govern development phasing, financing, maintenance responsibilities, and administration of the Specific Plan.

3.2.4 PROPOSED TENTATIVE TRACT MAP
Proposed Tentative Tract Map TTM 37963 proposes to subdivide 154.50 acres of the Specific Plan area located south of Green River Road into nine (9) lots. The lots would be in PAs 1, 2, 3, 5, and 6 as proposed by SPA2020-0006. The purpose of the subdivision proposed by TTM 37963 is to facilitate the change of zone proposed by SPA2020-0006 for PAs 1, 2, 3, 5, and 6 and development within PAs 1, 2, and 3 as proposed by PP2020-0004. The Assessor Parcel Numbers (APNs) for the Project include: 101-180-014; 101-180-015; 101-180-017; 101-180- 034; 101-180-035; 101-180-037; 101-180-038; and 101-190-034. PA 4, which is located on the north side of Green River Road, is not part of the subdivision proposed by TTM 37963 because there is currently no associated development plan proposed for PA 4 at this time.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-16
This Page Intentionally Left Blank
FIGURE 3-5: EXISTING AND PROPOSED SPECIFIC PLAN LAND USE DESIGNATIONS SOURCE: ENPLANNERS INC., 2024. PAGE: 3-17

EXISTING SPECIFIC PLAN LAND USE DESIGNATIONS PROPOSED SPECIFIC PLAN LAND USE DESIGNATIONS

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-18
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-19

3.2.5 PROPOSED PRECISE PLAN
Precise Plan PP2020-004 covers the proposed BPI Development component of the Project within proposed PAs 1, 2, and 3. The Precise Plan includes detailed site planning, architectural treatments, landscaping details, and a signage plan for the future construction of five (5) light industrial buildings within the proposed BPI land use designation. The building sizes would range from 86,600 square feet to 296,737. The total building square footage planned within the BPI designation would be 746,167 square feet.

The proposed grading plan would create five building pads designed to be flat to very gently sloping to accommodate flat building foundations and parking areas. The pads would be higher in elevation compared to Green River Road, and Street A would increase in grade as it extends south from Green River Road. Manufactured slopes would be constructed around the development pads, with the manufactured slopes transitioning into the natural condition at certain perimeters. The permanently disturbed area is estimated to be 64.8 acres, with an additional 2.76 acres temporarily disturbed for construction. Approximately 1,267,300 cubic yards of cut and 1,120,300 cubic yards of fill are anticipated. Earthwork volumes are expected to balance after compaction. The proposed BPI Development site plan is shown in Figure 3-6.

Building 1 is proposed within proposed PA 1 and would contain a total of 296,737 square feet of building area (285,535 square feet building footprint; 11,202 square feet of mezzanine space). Truck trailer loading docks are proposed along the southern side of the building and decorative metal fencing is proposed to secure the truck courts and assist in screening the proposed truck docking area from public view. Passenger vehicle parking areas would occur to the west, north, and east of the building, as well as to the south side of the truck trailer docking area. The maximum height of Building 1 is proposed at 46’-6”. Roofline parapets are proposed to screen rooftop equipment and metal mechanical screens are proposed above the proposed ancillary office spaces to additionally shield rooftop mechanical equipment from public view. Access to Building 1 would be provided from a driveway connecting with Street A.

Buildings 2 and 3 are proposed within proposed PA 2. Building 2 would contain a total of 131,695 square feet of building area (125,588 square feet building footprint; 6,107 square feet of mezzanine space) and Building 3 would contain a total of 130,980 square feet of building area (124,693 square feet building footprint; 6,287 square feet of mezzanine space). Truck trailer loading docks are proposed along the east side of Building 2 and along the west side of Building 3. Decorative metal fencing is proposed to secure the truck courts and assist in screening the proposed truck docking areas from public view. Passenger vehicle parking areas are proposed to the west, north, and east of the proposed buildings, with additional passenger vehicle parking proposed along the south side of Building 3. The maximum heights of Buildings 2 and 3 are proposed at 43’-0”. To conceal rooftop mechanical equipment, roofline parapets would be installed and metal mechanical screens are proposed above the ancillary

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-20
This Page Intentionally Left Blank
PAGE: 3-21
FIGURE 3-6: PROPOSED BUSINESS PARK SITE PLAN
SOURCE: BASTIEN AND ASSOCIATES, INC., 2023.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-22
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-23
office areas for additional screening of rooftop equipment from public view. Access to Buildings 2 and 3 would be accommodated by driveways extending from Street A. Buildings 4 and 5 are proposed within proposed Planning Area 3. Building 4 would contain a total of 100,155 square feet of building area (93,868 square feet building footprint and 6,287 square feet of mezzanine space) and Building 5 would contain a total of 86,600 square feet of building area (80,320 square feet building footprint and 6,280 square feet of mezzanine space). Truck trailer loading docks are proposed along the east side of Building 4 and along the west side of Building 5. Decorative metal fencing is proposed to secure the truck courts and assist in screening the proposed truck docking areas from public view. Passenger vehicle parking areas are proposed to the west, south, and east of the proposed buildings, with additional passenger vehicle parking proposed along the north side of Building 5. The maximum heights of Buildings 4 and 5 are proposed at 43’-0”. To conceal rooftop mechanical equipment, roofline parapets would be installed and metal mechanical screens are proposed above the ancillary office areas for additional screening of rooftop equipment from public view. Access to Buildings 4 and 5 would be accommodated by two driveways extending from Street A, and a single emergency-only driveway extending from Dominguez Ranch Road.

The five proposed industrial building exteriors would be constructed using typical concrete tilt-up panels. Variable rooflines and screening elements would be used to break up monotonous roof lengths and widths. Complexity would be added to façades by adding glazing and articulated stone veneer to ancillary office spaces. A mix of colors would be used to further break up facades including brown and light brown colors near offices and light brown and offwhite colors along the remaining portions of the buildings. Metal mechanical screens would be installed above the office spaces to shield roof-top mechanical equipment from public view.

Decorative metal fencing would be used to screen the truck docks from public view.

The landscape plan for the proposed BPI component would be landscaped with a combination of trees, shrubs, and groundcover throughout the site. Surrounding the parking and buildings areas would include a mixture of 24-inch box trees comprised of Chinese pistache, desert museum palo verde, coast live oak, and forest pansy redbud. Landscaping on the manufactured slopes in the southern portions of the site, for slope stabilization and aesthetic purposes, would include hydroseeded and a mixture of 24-inch box trees comprised of California laurel, coast live oak, and Catalina cherry.

In addition, the frontages along Green River Road, Fresno Road, and Dominguez Ranch Road would accommodate a landscaping buffer along proposed manufactured slopes. The parkways of these roads along the site’s frontage would include 24-inch box coast live oak trees, while trees within the landscape buffer would include mixture of 24-inch box trees comprised of California sycamore, California laurel, and crape myrtle .

At the main entrance along Street A, the street corners would include a major entry sign, 48- inch box coast live oak trees, 24-inch box forest pansy redbud accent trees, and shrubs

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-24
including creeping sage, pink muhly, artichoke agave, and century plant. Enhanced landscaping elements at the intersections of Fresno Road at Green River Road and Dominguez Ranch Road at Green River Road would be similar, however would feature a smaller entry sign and corner enhancement landscaping.

The maximum extent of off-site improvements would include roadway improvements and utilities connections adjacent to the Modified Project within the Fresno Road, Green River Road, and Dominguez Ranch Road rights-of-way.

3.3 RELOCATION OF PCL-1 PROJECT DEFINITION
Over the past 20 years since the WR-MSHCP was approved, discussions regarding the existing location of PCL-1 have occurred because of several known constraints associated with its alignment. Most recently in 2016, a Criteria Refinement analysis for the relocation of PCL-1 was submitted to Regional Conservation Authority (RCA) but not approved. The City, RCA, and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Wildlife (CDFW) generally agree relocation of PCL-1 to a superior alignment would better meet the expressed goals of the MSCHP.

As noted previously, there is general agreement that constraints reduce the potential effectiveness of the existing alignment of PCL-1. As such, the proposed Relocation of PCL-1 would ensure that areas to the north and south of SR 91 and the Santa Ana River can be linked to provide a viable wildlife Linkage. Although the alternate PCL-1 would introduce a slight reduction in acreage, the total amount of protected land will be maintained by incorporating new areas outside the original zone. Moreover, the alternate PCL-1 alignment would conserve over 500,000 acres of land, reduce connection obstacles between the Santa Ana Mountains and the Chino Hills, and allow for the development of the GRRSP Planning Area.

3.4 EXISTING LAND USES, GENERAL PLAN LAND USE

DESIGNATIONS, AND ZONING
Modified Project
Table 3-2 provides a summary of existing land uses, General Plan land use designations, and zoning for the GRRSP Planning Area and surrounding areas.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-25
Table 3-2: Modified Project Existing Land Uses, General Plan Land Use Designations, Zoning
Location Current Land Uses
General Plan Land Use
Designations Zoning
Existing
GRRSP
Planning Area
Vacant Mixed Use:

Industrial/Commercial;
General Commercial;
Estate Residential 1-3 du/ac
Green River Ranch Specific
Plan - Mixed Use;
Commercial – General;
Estate Residential;
Manufactured Slopes &
Public Streets.

Northeast Railway;
Vacant
Light Industrial Light Manufacturing.

Northwest SR-91 right-of-way;
Multi-family
development;
Commercial
development.

Open Space General;
Medium Density Residential 6-15
du/ac;
General Commercial.

Open Space;
Low Density Multiple
Family; Residential;
General Commercial.

East Vacant;
Commercial
development.

Open Space General;
General Commercial
Sierra Del Oro Specific Plan -
Neighborhood Commercial
District; Open Space.

South Vacant Rural Mountainous (Corona SOI);
Rural Foundation (Riverside
County)
Rural Residential (Riverside
County)
West Vacant Rural Mountainous (Corona SOI);
Rural Foundation (Riverside
County)
Rural Residential; Multiple
Family Dwellings (Riverside
County)
Source: City of Corona General Plan Land Use Map, 2018. Riverside County General Plan Land Use Element, 2021.

Relocation of PCL-1
Table 3-3 provides a summary of existing land uses, General Plan land use designations, and zoning for the Relocation of PCL-1 alignment and surrounding areas. Note, the PCL-1 alignment is within the City’s Sphere of Influence (SOI) and unincorporated Riverside County.

Table 3-3: Relocation of PCL-1 Existing Land Uses, General Plan Land Use Designations, Zoning
Location Current Land
Uses
General Plan Land Use
Designations
Zoning
Existing
PCL-1
Alignment
Vacant Mixed Use: Industrial/Commercial;
General Commercial;
Estate Residential 1-3 du/ac.

Rural Mountainous (Corona Sphere
of Influence); Rural Foundation
(Riverside County)

GRRSP -
Mixed Use;
Commercial – General;
Estate Residential;
Manufactured Slopes &
Public Streets.

Rural Residential (Riverside
County)

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-26

3.5 PROJECT OBJECTIVES
The California Environmental Quality Act (CEQA) Guidelines require an EIR Project Description include “a statement of objectives sought by the proposed project.” Modified Project
The following project objectives from the previously approved GRRSP EIR remain valid for the proposed Modified Project.
• To provide for the orderly and efficient development of the Green River Ranch property. • To implement the goals, objectives, and policies of the City of Corona General Plan. • To develop land uses which reflect sound economic, market, and financial consideration. • To develop uses which will generate additional revenue for the City of Corona, and establish a strong tax base for the City.
• To provide convenient commercial and industrial services for the community, in addition to similar services for freeway oriented and generated visitors. • To promote organized and well-planned development within the Specific Plan area. • To provide guidance and direction for the future development of this property. • To create an aesthetically pleasing western gateway into the City of Corona.

Table 3-3: Relocation of PCL-1 Existing Land Uses, General Plan Land Use Designations, Zoning
Location Current Land
Uses
General Plan Land Use
Designations
Zoning
Northeast Railway;
Vacant
Light Industrial
Light Manufacturing.

Northwest SR-91 right-of-way;
Multi-family
development;
Commercial
development.

Open Space General;
Medium Density Residential 6-15
du/ac;
General Commercial.

Open Space;
Low Density Multiple
Family; Residential;
General Commercial
East Vacant;
Commercial
development.

Open Space General;
General Commercial
Sierra Del Oro Specific Plan
-
Neighborhood Commercial
District;
Open Space.

South Vacant Cleveland National Forest Cleveland National Forest West Vacant and Star
Ranch;
Rural Mountainous (Corona SOI);
Rural Foundation (Riverside
County); Open-Space (City of
Anaheim).

Rural Residential; Multiple
Family Dwellings (Riverside
County); Open-Space ( City
of Anaheim).

Source: City of Corona General Plan Land Use Map, 2018. Riverside County General Plan Land Use Element, 2021.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

PROJECT DESCRIPTION

ENPLANNERS
3-27
Relocation of PCL-1
The project objectives for the proposed Relocation of PCL-1 are as follows:
• Improve wildlife linkage between Core Areas A and B by connecting wildlife habitats, between the Santa Ana Mountains, Prado Basin, and Chino Hills. • Establish a superior PCL-1 wildlife corridor due to existing constraints from roads, railroads, SR 91, and development associated with the existing PCL-1 alignment. • Increase overall Covered Habitat as described in the WR-MSHCP through conserving additional lands.

3.6 DISCRETIONARY ACTIONS, PERMITS, AND OTHER

APPROVALS
The legislative and discretionary actions to be considered by the City as part of the proposed Project include:

Modified Project
• General Plan Amendment No. 2020-0002 (GPA2020-0002): The Modified Project requires City approval of a GPA to amend the existing GRRSP designations. As discussed in Section 3.2.2, the MU2 designation on approximately 5.5 acres would change to GC.

The current configuration and designation of MU2, GC, ER, and OS-G on 49.31 acres would change to Light Industrial (LI). The current configuration and designation of MU2 and ER on approximately 20.39 acres would change to ER. The configuration and designation of ER on 83.34 acres would change to Open Space. • Specific Plan Amendment to the GRRSP (SPA2020-0006): The Modified Project requires City approval of an SPA to amend the existing GRRSP Land Use Plan and the City’s Zoning Map consistent with GRRSPA No. 1. As discussed in Section 3.2.3, the Modified Project would: redesignate 5.5 acres from Mixed Use to General Commercial as part of proposed PA 4; redesignate 49.52 acres of Mixed Use, Hotel/Mixed Use/Office, and General Commercial to BPI as part of proposed PAs 1 through 3; Estate Residential would occur on 20.39 acres within proposed PA 5; Open Space – General would cover

83.34 acres as PA 6; and onsite roadways would be reconfigured to provide a single northsouth oriented access road (Street A), which would connect to Green River Road in the north and provide primary vehicular access to PAs 1, 2, 3, and 5. In addition to amending the land uses, the Modified Project requires City approval of a conceptual grading plan and a conceptual infrastructure plan; amendments to development standards; design Guidelines for site planning, architectural character, landscape architecture, and development phasing, financing, maintenance responsibilities, and administration of the Specific Plan.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

PROJECT DESCRIPTION

ENPLANNERS
3-28
• Tentative Tract Map No. 39763 (TTM 37963): The Modified Project requires City approval of a TTM to change the City Zoning Map consistent with GGRSP. As discussed in Section 3.2.4, the Modified Project Site is comprised of Assessor’s Parcel Numbers 101- 180-014; 101-180-015; 101-180-017; 101-180-034; 101-180-035; 101-180-037; 101-180- 038; and 101-190-034. The TTM would subdivide 154.90 acres of the Specific Plan area into nine (9) lots within PAs 1 through 6.
• Precise Plan No. 2020-0004 (PP2020-004) (pertaining to the industrial park component of the proposed Project in PAs 1, 2 and 3): The Modified Project requires City approval of a PP to approve the final design of the proposed industrial park component of the Project within PAs 1, 2, and 3. As discussed in Section 3.2.5, the PP includes detailed site planning, architectural treatments, landscaping details, and a signage plan for the future construction of five (5) light industrial buildings within the proposed BPI land use designation. The building sizes range from 86,600 square feet to 296,737 resulting in a total of 746,167 square feet. In addition, the PP would include off-site improvements to roads and utilities impacting a total of 12.8 acres.

Relocation of PCL-1
• Relocation of Proposed Constrained Linkage: The proposed Relocation of PCL-1 requires the City, as permittee to the WR-MSHCP, to prepare CEQA documentation and approval of the relocation based on superiority of the proposed alignment in comparison to the alignment of existing PCL-1. This SEIR will be used by RCA, the U.S. Fish and Wildlife Service and California Department of Fish and Wildlife to approve the relocation in their role as Responsible and Trustee agencies.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

MODIFIED PROJECT ENVIRONMENTAL IMPACT ANALYSIS

ENPLANNERS
4-1

4.0 MODIFIED PROJECT ENVIRONMENTAL IMPACT

ANALYSIS

4.0.1 APPROACH TO THE ENVIRONMENTAL ANALYSIS OF THE

PROPOSED MODIFIED PROJECT
Section 4 of this SEIR presents the impact analysis of the Modified Project. The Modified Project consists of two components, the proposed Amendment to the Green River Ranch Specific Plan (GRRSP) and an entitlement request for development of the Business Park Industrial (BPI) portion of the GRRSP. The GRRSP Amendment (GRRSPA) is analyzed at a programmatic level and the BPI Development is analyzed at a project level. For some environmental topics, the impact analysis for each component is analyzed separately because of the difference between program and project level analysis.

In these instances, subheadings are added to distinguish the separate GRRSPA and BPI Development analyses. In other subsections, the analysis is conducted for the overall GRRSPA inclusive of the BPI Development because the program and project level analyses are the same. In these instances, no subheadings are needed and therefore none are provided.

Because this SEIR addresses two separate but related projects, use of the terms Project, Project site, or Project area in Section 4 is in reference to the proposed Modified Project including the GRRSPA and BPI Development. Similarly, use of these terms in Section 5 is in reference to the proposed Relocation of PCL-1.

Pursuant to CEQA and the State CEQA Guidelines, a lead agency shall focus the EIR’s discussion on significant environmental effects and may limit discussion on other effects to brief explanations about why they are not significant (PRC Section 21002.1, State CEQA Guidelines Section 15128). Potentially significant impacts were identified based on review of comments received as part of the public scoping process (see Appendix A), comments received in response to the Notice of Preparation, (see Appendix B), technical studies prepared for the proposed Project and the Relocation of PCL-1, and additional research and analysis of relevant data during preparation of this Draft SEIR.

The City has determined that the Modified Project has the potential to result in new and/or substantially more severe significant environmental impacts (pursuant to the State CEQA Guidelines [Section 15162]) on the following resources, which are addressed in detail in this Draft SEIR:

4.1 Aesthetics 4.2 Land Use and Planning

4.3 Agricultural & Forest Resources 4.4 Minerals

4.5 Air Quality 4.6 Noise

4.7 Biological Resources 4.8 Population and Housing

4.9 Cultural Resources 4.10 Public Services

4.11 Energy 4.12 Recreation

4.13 Geology / Soils 4.14 Transportation

4.15 Greenhouse Gas Emissions 4.16 Tribal Cultural Resources

4.17 Hazards & Hazardous Materials 4.18 Utilities / Service Systems

4.19 Hydrology / Water Quality 4.20 Wildfire

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

MODIFIED PROJECT ENVIRONMENTAL IMPACT ANALYSIS

ENPLANNERS
4-2
The previously certified EIR included an Initial Study used to screen or focus the EIR to include only those impacts needing further analysis. The certified EIR includes the Initial Study, Draft EIR and supporting technical studies, and Final EIR. For the purposes of this SEIR, references to the previously certified 2001 EIR is defined as all of the analysis contained in the certified EIR including the conclusions from the Initial Study.

4.0.2 MODIFIED ENVIRONMENTAL CHECKLIST
The City created modified checklist headings to address the questions posed by CEQA Guidelines Sections 15162 and 15163 regarding Subsequent and Supplemental documents. The headings are included in Section 4.1 through 4.20 and include the following:
• Would the Modified Project result in new or more severe impacts requiring revisions to the Prior EIR;
• Would the Modified Project be implemented under changed circumstancesresulting in new or more severe impacts requiring revisions to the Prior EIR;
• Is there new information that would result in new or more severe impacts from the Modified Project requiring revisions to the Prior EIR;
• Would the Modified Project result in eliminated, reduced, or no changes to impacts and no changes to the Prior EIR are required.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-1

4.1 AESTHETICS

4.1.1 INTRODUCTION
This section provides a summary of applicable impacts and mitigation measures from the 2001 EIR, describes the existing visual setting and aesthetic character of the GRRSP Planning Area and proposed BPI Development site and evaluates the potential for the Modified Project to result in a change in impacts to scenic vistas and/or conflicts with applicable zoning and other regulations governing scenic quality in comparison to the Approved Project. This analysis focuses on changes to scenic vistas that would be seen from public viewpoints and provides an assessment of whether the Project would conflict with applicable zoning and other regulations governing scenic quality. No NOP comment letters were received pertaining to this topic. A Public Scoping Meeting comment was received from Craig Reiter, Cassandra Stone Francesca Da Sacco pertaining to this topic.

This section of the Draft SEIR is based on the Green River Ranch Visual Impact Analysis, prepared by T&B Planning, dated January 8, 2024 (Appendix C) .

4.1.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The Approved Project impact analysis related to Aesthetics as presented in Section 4.6 of the 2001 EIR as well as any mitigation measures identified to reduce significant impacts are summarized as follows.
a) Affect the scenic vista or scenic highway?
b) Have a demonstrable negative aesthetic effect?
c) Create light or glare?
The 2001 EIR identified a potential impact associated with the Approved Project. Due to the conceptual nature of the documentation provided by the GRRSP, construction of the manufactured slope proposed between PAs 1 and 5 and PA 6 and development of the estate residential homes in PA 6 were determined to be potentially inconsistent with the City’s Hillside Development Overlay Ordinance resulting in a potentially significant impact. The 2001 EIR determined implementation of mitigation measures, MM 4.6.1A through MM

4.6.1L, MM 4.6.2A through MM 4.6.2C, and MM 4.6.3A would reduce such impacts to aesthetics and visual resources related to visual intrusiveness of development to less than significant. Implementation of the mitigation measures were determined to also reduce inconsistencies with the City's Hillside Development Overlay Ordinance to less than significant levels. Additional light and glare visible from adjacent land uses and the light and glare spillover that may affect nearby sensitive residential uses were determined to be less than significant with implementation of Mitigation measures MM 4.6.1M through 4.6.1O. Lastly,

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-2
the EIR concluded neither SR 91 nor Green River Road were identified as a Scenic Highway or Corridor in the City’s General Plan.

Cumulative Impacts
The 2001 EIR also determined cumulative impacts were less than significant as there were no other development projects when considered together would create a significant visual impact over and above those at the Project level. Therefore, implementation of Project level mitigation measures would reduce cumulative impacts to less than significant levels.

4.1.3 ENVIRONMENTAL SETTING
The GRRSP Planning Area is located in the west end of the City in the western portion of Riverside County. The Project area is approximately 160.00 acres located south of SR 91, southwest of Dominguez Ranch Road, and southeast of Fresno Road.

As shown in Figure 4.1-1, Site Photos, the Project area includes steep terrain from northerly trending slopes of the lower foothills of the Santa Ana Mountains and generally level terrain in the northern portions of the GRRSP Planning Area. Elevations range from a height of 1,110 feet above mean sea level (AMSL) in the southwestern corner of the property to 515 feet AMSL adjacent to Green River Road, with a maximum topographic relief of approximately 595 feet. As shown in Figure 4.1-1, photos depict the majority of the GRRSP Planning Area lies within the ridgelines and valleys of the Santa Ana foothills. Beyond the Project area to the north is SR 91 including the SR 71 interchange, the westerly flowing Santa Ana River, and the Chino Hills.

In addition, there is an existing paved roadway (Fresno Road) near the western property line.

As analyzed in the 2001 EIR, the central and northern portions of the site were being used as equestrian stables, however such equestrian operations have been removed. The existing GRRSP Planning Area is currently in a largely undeveloped condition as existing at the time of the 2001 EIR.

FIGURE 4.1-1: SITE PHOTOS
SOURCE: GLENN LUKOS ASSOCIATES, 2023. PAGE: 4.1-3

SOUTHEAST VIEW FROM FRESNO ROAD

WEST VIEW FROM WESTERN BOUNDARY

EAST VIEW FROM SOUTHERN BOUNDARY

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-4
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-5

4.1.4 EXISTING REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL REGULATIONS
There are no federal regulations that apply to the Modified Project.

STATE REGULATIONS
Caltrans Scenic Highway Program
In 1963, California's Scenic Highway Program was created to preserve and protect the natural scenic beauty of California highways and adjacent corridors through special conservation treatment. The state laws governing this program are in the Streets and Highways Code, Sections 260 to 2684, and Caltrans oversees the program. Caltrans defines a scenic highway as any freeway, highway, road, or other public right-of-way that traverses an area of exceptional scenic quality. Suitability for designation as a State Scenic Highway is based on three criteria described in Caltrans’s Guidelines for Official Designation of Scenic Highways (2008):
• Vividness. The extent to which the landscape is memorable. This is associated with the distinctiveness, diversity, and contrast of visual elements. • Intactness. The integrity of visual order and the extent to which the natural landscape is free from visual intrusions (e.g., buildings, structures, equipment, grading). • Unity. The extent to which development is sensitive to and visually harmonious with the natural landscape.

REGIONAL REGULATIONS
There are no regional regulations that apply to the Modified Project.

LOCAL REGULATIONS
City of Corona Design Guidelines
Citywide design guidance is primarily provided through two documents—Residential Development Design Guidelines and Industrial Development Design Guidelines. Additionally, adopted specific plans for certain areas of the city have design guidelines for that planning area. To complement the emphasis on building design, the City also adopted landscape design guidelines for commercial, industrial, and residential use. The guidelines accompany mandatory site development regulations in the zoning ordinance and specific plans. These documents also provide procedural guidance for applicants and guidelines for City staff in reviewing an approving designs and verifying compliance.

Specific Plans
The City has adopted numerous specific plans that provide community identity and development standards for specific areas in the city. In most cases the specific plan is the

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-6
guiding and governing document for certain areas and includes development regulations similar to those found in the city’s Zoning Ordinance.

Corona Zoning Ordinance
The City’s Municipal Code, Title 17, Zoning, provides provisions to guide development in a way that maintains the city’s community character and visual resources in each of the land use districts. The zoning ordinance regulates density, design, height, and setbacks for each of the zoning districts. In addition, the zoning ordinance provides minimum standards for landscaping (Chapter 17.70, Landscaping, Fences, Walls, and Hedges) and signage (Chapter 17.74, Signs).

City of Corona 2020–2040 General Plan
Community Design Element
Goal CD-1: Public street landscapes that unify the City of Corona and contribute to the unique identity of its neighborhoods, districts, and public places.

Policy CD-1.1: Require the planting and maintenance of street trees as part of development applications with consideration for the following principles:
• Physical constraints of the public street right-of-way, maintenance needs, and safety. • Importance of shade, beauty, and variety of species that encourage pedestrian activity. • Reflects the context of the surrounding residential, commercial, office, or industrial land uses.

Policy CD-1.3: Maintain a street landscape master plan that identifies species to be used along public streets throughout the City. A palette of trees and landscaping should be designed to allow for:
• Differentiation within key districts in the City, including Downtown, Sixth Street, North Main, and other locations.
• Differentiation at the street’s key nodal intersections, entryways, and public places. • Sustainable landscaping practices including but not limited to drought-resistant species.

Policy CD-1.5: Require developers of residential subdivisions to submit a landscape plan that defines a program of trees and plantings that uniquely identify streets, principal entries and intersections, and activity centers such as parks and community facilities.

Goal CD-2: Entries that are well defined by signage, landscaping, lighting, and other visual landmarks that provide a clear sense of arrival into and identity for the City of Corona.

Policy CD-2.1: Implement improvements at key entries into Corona from the SR-91 and I-15 corridors that provide a distinct sense of arrival and identity. These may include well designed signage, landscape, lighting, public art, monuments, fountains, structures, and other

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-7
elements that serve as visual landmarks. Common elements (graphics, signage, etc.) should be used to visually distinguish the location as a primary City entry.

Potential locations include the SR-91 interchanges at McKinley Street, Main Street, Grand Boulevard, Lincoln Avenue, Sixth Street, Serfas Club Drive-Auto Center Drive, and Green River Road, and the I-15 interchanges at Magnolia Avenue, Ontario Avenue, and Cajalco Road.

Policy CD-2.2: Coordinate the design of entry improvements with adjoining commercial and industrial property owners, where appropriate. Encourage the owners to incorporate landscape, signage, and architectural design elements in their projects that contribute to and complement the sense of entry from the freeways.

Policy CD-2.3: Continue to promote the establishment of entry monumentation to identify and convey a distinct sense of arrival to designated communities, districts, and neighborhoods in Corona.

Goal CD-3: Well designed, high quality, and distinctive public and private signage that identifies key City districts, public facilities, buildings, and facilitates wayfinding.

Policy CD-3.3: Work with private developers and property owners to develop on-site project signage for identification, traffic direction and wayfinding, and parking that complements the City’s design program, where appropriate.

Policy CD-3.4: Require that signage on private buildings be designed to exhibit a high quality of interest and visual appeal; be integrated into and reflect the building’s architectural design character; and be sized to not overwhelm its scale and mass.

Goal CD-4: A network of trails and greenways that interconnect Corona’s parklands, open spaces, and drainages that provide hiking and bicycle opportunities and access into surrounding open spaces and natural areas.

Policy CD-4.2: New development adjoining open spaces, washes or have the ability to provide pedestrian connections to off-site trails or pathways should be designed to ensure landscape transitions and compatibility with these resources. Such improvements should be designed to provide adequate flood protection for adjoining properties.

Goal CD-5: A city of well-designed residential neighborhoods, commercial districts and corridors, industrial districts, and civic places that are uniquely identifiable in their building form, public places, and landscapes, contributing to a high quality of life for residents and positive image for visitors to the City.

Policy CD-5.8: Require commercial and office centers to enhance their aesthetic quality, image, and “fit” with adjoining land uses. Elements may encompass site and entry identification by signage, landscape, or lighting; extensive on-site landscape; public art; improvements of abutting public streetscapes; and other amenities.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-8
Policy CD-5.9: Require that the renovation of existing buildings and new construction within freeway-oriented and community-oriented commercial centers exhibit a high and distinctive level of architectural character and site design character by adherence to policies in the land use and community design elements and established design guidelines.

Policy CD-5.10: Require industrial projects to enhance their aesthetic quality, image, and “fit” with adjoining land uses. Elements may encompass site and entry identification by signage, landscape, or lighting; extensive on-site landscape; public art; improvements of abutting public streetscapes; and other amenities.

Policy CD-5.11: Require that the renovation of existing buildings and new construction within industrial and business parks exhibit a high level of architectural and site design character by adherence to policies in the land use and community design elements, and established design guidelines.

Goal CD-6: Develop and implement land use controls that preserve significant visual resources from potential loss or disruption.

Policy CD-6.1: Ensure unobstructed view corridors or viewsheds of the San Bernardino, Santa Ana, and San Gabriel Mountains, the Chino and La Sierra Hills, and other significant natural features from public spaces such as parks, termination of streets and community trails, community centers, and school properties, where feasible, as part of the design of development projects.

Policy CD-6.2: Require that project applicants identify and map all slopes greater than 15 percent on parcels within the City’s hillside areas, referred to as the “Hillside Management District,” in increments of 5 percent. Lands within this District shall be subject to administrative review to ensure that development is located and designed to reflect its distinct environmental and topographic characteristics consistent with the policies of this plan, under the provisions of a Hillside Development Ordinance.

Policy CD-6.3: Require that development in hillside areas with greater than 25 percent slope be clustered on the most gently sloping portions of the site, to the extent feasible, according to the following density limitations of the underlying land use plan designations.

Maximum Percentage of
Site to be Graded
Maximum Percent of
Allowable Density
40-44.9% 100%
45-49.9% 90%
50-54.9% 80%
55-59.9% 70%
60-64.9% 60%
65-69.9% 50%

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-9
70-74.9% 40%
75-79.9% 30%
80-84.9% 20%
85+% 10%
Policy CD-6.4: Require that projects be designed and sited to maintain the natural topographic, physiographic, and aesthetic viewshed characteristics of those features, utilizing the following conditions:
• Minimize the area and height of cuts and fills to the extent technically achievable, ensuring that slope tops and bottoms are rounded and facilitate a smooth and seamless transition where natural and built slopes intersect.
• Configure development sites to mimic predevelopment natural topography by clustering sites and individual units and avoiding extensive fragmentation of steep slopes, “stair stepping” and varying terraces of structures, and/or other design practices. • Minimize the size of flat development pads in site grading to that necessary to accommodate the building footprint, a reasonable amount of useable outdoor space, and structural and site stability.
• Encourage building architectural design styles, forms and shapes, materials, and building siting to complement rather than visually dominate their landscape setting. • Minimize the height of retaining walls, and design with smooth flowing forms that follow topography and with material colors and textures that blend in with the surrounding landscape.
• Plant hillside and canyon slopes with natural species of drought-tolerant plantsto soften the visual impact of land grading, retaining walls, structures, and roads and maintain (to the extent feasible) natural vegetation.
• Restore disrupted vegetation, wildlife habitat, natural water courses, drainage swales, and other important viewshed features. Vegetation should be arranged in informal masses to create a textured slope characteristic of natural chaparral mountain slope terrain. (Imp 2)
Goal CD-7: Maintain, establish, develop, and protect the City’s highways and corridors for scenic purposes.

Policy CD-7.2: Regulate new development, substantial rehabilitation, or renovation projects through provisions that require an analysis of impacts of development on the quality of the City’s designated highways and corridors.

Policy CD-7.3: Prohibit installation or expansion of poles, billboards, and other aboveground appurtenances from detracting from the views along the City’s scenic highways and corridors; phase out uses that impair scenic views.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-10

4.1.5 PROJECT DESIGN FEATURES (PDF)
PDF AES -1: GRRSP as Amended: Proposed Amendment No.1 to the Green River Ranch Specific Plan (GRRSP) contains a number of development standards and design guidelines related to visual quality. Subsection 2.2 of the GRRSP indicates that grading activities associated with future development would be required to be conducted in a manner that closely resembles the natural terrain, and requires slopes to be landscaped in “natural-looking” arrangement in conformance with the City of Corona Landscape Design Guidelines.

Subsection 3.3 establishes the development standards within the Specific Plan area, and identifies requirements for building setbacks, heights, lot coverage, and other Green River Ranch Visual Impact Analysis Page 12 requirements. Subsection 3.3 also includes supplemental standards intended to reduce adverse visual effects associated with future development of the Specific Plan area, and includes standards related to walls and fencing; signage; entry monumentation; parking; and off-street loading. Section 4.0 of the GRRSP includes design guidelines related to site planning; landscape architecture; entry treatments; parking areas; wildland/urban interface treatments; walls and fences; lighting; and architectural character. Future development on site would be required to comply with all applicable development standards and design guidelines as established by proposed Amendment No. 1 to the Green River Ranch Specific Plan.

PDF AES-2: Precise Plan No. 2020-0004: Precise Plan P2020-0004 outlines the proposed development of five (5) light industrial buildings within the Business Park Industrial land use designation across PAs 1, 2 , and 3. These buildings ranging from 86,600 to 296,737 square feet, are planned in accordance with PDF-1 with detailed site planning, architecture, landscaping, and signage. The grading plan involves creating a relatively flat (slightly sloping) building pads elevated above Green River Road, with manufactured slopes transitioning into the natural hillside. The exteriors of the industrial buildings will feature concrete tilt-up panels with varied roofline, glazing, stone veneer, and metal screening. Landscaping will comprise a mix of trees, shrubs, and groundcover, with specific species chosen for stability and aesthetics, and along the Project frontages, landscaping buffers will include a variety of tress. Roadway improvements and utility connections are planned as part of off-site improvements adjacent to the Project boundary.

PDF AES-3: Business Park Industrial Buildings Low Glare Windows: Windows to be used for the industrial buildings are to be clear anodized, where approved front glazed, aluminum mullion system with reflective blue/green glass.

4.1.6 THRESHOLDS OF SIGNIFICANCE
Based on the relevant CEQA Guidelines as currently implemented by the City of Corona, significant visual quality impacts would occur if the proposed Project or any Project-related component would:

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-11
Threshold AES-1 Have a substantial adverse effect on a scenic vista? Threshold AES-2 Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway?
Threshold AES-3 In an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
Threshold AES-4 Create a new source of substantial light or glare that would adversely affect daytime or nighttime views in the area?

METHODOLOGY
There are no, locally designated or defined standards or methodologies for the assessment of aesthetic impacts. Consequently, the characterization of aesthetics can be highly subjective.

Therefore, the evaluation of aesthetic resources in the built environment and natural landscape requires the application of a process that objectively identifies the visual features of the landscape and their importance, and the sensitivity of receptors that view them. The characterization of aesthetics involves establishing existing visual character of a project site and its surroundings, including resources and scenic vistas unique to the project area. Visual resources include existing landforms (e.g., topography and grading), views (e.g., scenic resources such as natural features or urban characteristics), viewing points/locations, and existing sources of light and glare (e.g., nighttime illumination). Changes to the existing aesthetic environment that would result from implementation of the Modified Project are identified and qualitatively evaluated based on the modifications to the existing setting and the viewer’s sensitivity that are associated with the proposed GRRSPA and BPI Industrial Development Project.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-12

4.1.7 ENVIRONMENTAL IMPACTS ASSOCIATED WITH MODIFIED PROJECT Impacts
Would the
Modified
Project result
in new or
more severe
impacts
requiring
revisions to
the Prior
EIR?
Would the
Modified Project be
implemented under
changed
circumstances
resulting in new or
more severe
impacts requiring
revisions to the
Prior EIR?
Is there new
information that
would result in
new or more
severe impacts
from the
Modified Project
requiring
revisions to the
Prior EIR?
Would the
Modified
Project result in
eliminated,
reduced, or no
changes to
impacts and no
changes to the
Prior EIR are
required?
Would the project:

AES-1 Have a substantial adverse
effect on a scenic vista?
AES-2 Substantially damage scenic
resources, including, but not
limited to, trees, rock
outcroppings, and historic
buildings within a state
scenic highway?
AES-3 In non-urbanized areas,
substantially degrade the
existing visual character or
quality of public views of
the site and its
surroundings? (public views
are those that are
experienced from publicly
accessible vantage point). In
urbanized areas, would the
project conflict with
applicable zoning and other
regulations governing
scenic quality?
AES-4 Create a new source of
substantial light or glare
which would adversely
affect day or nighttime
views in the area?

IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT
Impact AES-1: Have a substantial adverse effect on a scenic vista? Impact AES-3: Substantially degrade the existing visual character or quality of the site and its surroundings?

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-13
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

A scenic vista is a view that possesses visual and aesthetic qualities of high value to the community. Scenic vistas can provide views of natural features or significant structures and buildings.

As previously depicted on Figure 4.1-1, under existing conditions the southern portions of the Modified Project site are undeveloped and contain large, visually prominent undulating hillsides that are covered with natural vegetation primarily composed of grasslands and lowlying scrub. The northern portions of the property contain more gently sloping topography, with large areas previously used for horse stables and grazing, along with two single-family residences. The northern portions of the property do not comprise a scenic vista as these areas are not highly visible from off-site locations and the prior horse operation has been terminated.

The hillsides in the southern portions of the property are visually prominent and are a major component of the Modified Project’s viewshed.

With implementation of the Modified Project, the northern half of the property (approximately

5.5 acres) would be developed with approximately 19,600 sf of General Commercial uses (PA 4), approximately 746,167 sf of BPI uses (PAs 1, 2, and 3) and up to 32 Estate Residential dwelling units (PA5). The southern half of the Modified Project (approximately 83.34 acres) in PA 6 is proposed for Open Space to be acquired by the RCA and would therefore remain undeveloped in perpetuity.

Development of the Modified Project would be required to comply with the development standards and design guidelines of the GRRSP as amended, while development within the BPI Development portions of the Project would also be required to comply with the site-specific components included as part of Precise Plan No. 2020-0004. The GRRSPA and Precise Plan No. 2020-0004 implement the City’s General Plan policies related to aesthetics and comply with the City’s Landscape Design Guidelines. Development in conformance with the GRRSPA and Precise Plan No. 2020-0004 would ensure that the property is developed in a manner that is consistent with applicable design guidelines in the GRRSPA and General Plan, ensuring scenic resources are unaffected by the development and the development is aesthetically compatible with the existing visual character of surrounding developed structures.

The northern 5.5-acre portion of the Modified Project site are planned for General Commercial land uses in PA 4. This portion of the Modified Project occurs at the property’s lowest elevations and are not highly visible from off-site locations. This portion of the property is currently surrounded by the SR 91 freeway and railroad tracks to the north and Green River Road to the south. Additionally, lands to the east of this portion of the site are developed with business park and commercial retail uses, with residential and commercial uses occurring along the north side of SR 91. No specific development plans are proposed for this portion of the

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-14
Project site at this time, and future development of the General Commercial uses would be governed by the GRRSP as amended. Development of the General Commercial land uses would appear as a continuation of existing development patterns in the local area, and the proposed development would be visually compatible with the existing surrounding land uses.

Additionally, due to the relatively low topography of this portion of the Project site as compared to surrounding areas, development of commercial retail uses as proposed would not obstruct any views of scenic resources, such as the existing hillforms in the southern portions of the site. Development of the proposed General Commercial land uses would not result in an adverse effect on any existing scenic vistas, and would not substantially degrade the existing visual character or quality of public views of the site and its surroundings. Impacts would be less than significant, and no mitigation is required.

The Modified Project’s proposed BPI land uses would occur in PAs 1, 2 and 3 on approximately 37.82 acres south of Green River Road in areas that largely contain gently sloping terrain. This portion of the site would be visible from areas to the north as well as from the existing residential homes to the east of the site. In order to visualize the appearance of the proposed Project, a series of renderings were prepared as depicted on Figure 4.1-2, Conceptual Rendering – Aerial Perspective and Figure 4.1-3, Conceptual Rendering – Westerly Perspective. The renderings were prepared only for the BPI Development proposed as part of Precise Plan No. 2020-0004. The renderings do not depict views of the General Commercial uses in the northern portions of the site, or the 32 Estate Residential uses proposed in PA 5 in the southern portions of the site, as there are currently no development plans proposed for these areas.

Figure 4.1-2 provides a conceptual depiction of the proposed BPI Development buildings proposed as part of Precise Plan No. 2020-0004. This conceptual rendering depicts views from an aerial perspective, looking south.

As shown in the figure, the northern portions of the BPI Development would be graded to provide level pads for development. Landscape buffers are proposed along manufactured slopes to the north of the proposed buildings. While grading would occur at the base of the prominent hillforms on site, the proposed slopes would be contour graded to match the existing topography of these hillforms, and the manufactured slopes would be landscaped with hydroseed and trees. The large hillforms in the southern 83.34 portions of the property proposed for Open Space would continue to be visible from off-site locations.

FIGURE 4.1-2: CONCEPTUAL RENDERING - AERIAL PERSPECTIVE SOURCE: T&B PLANNING, INC., 2024. PAGE: 4.1-15

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-16
This Page Intentionally Left Blank
FIGURE 4.1-3: CONCEPTUAL RENDERING - WESTERLY PERSPECTIVE SOURCE: T&B PLANNING, INC., 2024 PAGE: 4.1-17

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-18
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-19
Figure 4.1-3 depicts views from the existing single-family residential neighborhood to the east of the BPI Development site, looking west. As shown from this perspective, the proposed BPI buildings would be visible from this location. As shown, the BPI development would not obstruct scenic vistas from this location. The hillsides in the southern portion of the Modified Project site would continue to be prominently visible from this location, and the proposed buildings would not obstruct distant views of the Chino Hills hillsides, which also are visible in the distance.

Figure 4.1-3 depicts views from the existing single-family residential neighborhood to the east of the BPI Development site, looking west. As shown from this perspective, the proposed BPI buildings would be visible from this location. As shown, the BPI development would not obstruct scenic vistas from this location. The hillsides in the southern portion of the Modified Project site would continue to be prominently visible from this location, and the proposed buildings would not obstruct distant views of the Chino Hills hillsides, which also are visible in the distance.

The conceptual renderings depicted on Figure 4.1-2 and Figure 4.1-3 demonstrate that development of the proposed BPI Development would not obstruct scenic vistas of the hillforms in the southern portions of the property, or distant views of the Chino Hills that are available from the existing single-family neighborhood to the east of the BPI Development site, and would not substantially degrade the existing visual character or quality of public views of the site and its surroundings. Furthermore, and as previously noted, areas to the east and north of the BPI site are developed with a mixture of commercial retail, business park, and residential land uses, and the proposed BPI Development buildings would further existing development patterns in the local area. Development of the proposed BPI Development would not adversely affect scenic vistas in the area resulting in a less than significant impact and no mitigation is required.

The southern portion of the Modified Project is planned for development of up to 32 Estate Residential single-family dwelling units with a minimum lot size of 25,000 square feet in PA5.

No specific development plans are proposed for this portion of the Modified Project site at this time. However, development throughout the GRRSP Planning Area would be required to comply with the development standards and design guidelines, of the GRRSP as Amended (PDF AES-1). Grading within this portion of the Modified Project would include the establishment of circulation access driveways and homesite pads for the planned 32 dwelling units. Future grading and development would be required to comply with the GRRSP, which includes requirements to ensure grading resembles the natural terrain as closely as possible.

Additionally, landscaping along manufactured slopes would be required to be planted in an informal, more natural-looking arrangement consistent with the City’s Parks and Recreation Community Facilities District landscape design standards, to ensure sufficient plant coverage on the slopes, and to provide a transition between manufactured pads and natural hillsides. The

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-20
planned Estate Residential dwelling units and associated improvements would be visible from off-site locations; however, due to the low intensity of the proposed development and the design requirements of the GRRSP, the planned homes would not substantially impact views of the existing on-site hillsides from off-site locations.

Furthermore, the planned 32 single-family homes would not obstruct or detract from views of other off-site scenic resources within the existing viewshed as the PA’s would be the southernmost development. Moreover, the planned single-family homes would be visually compatible with and less intense than the existing residential development to the east of the Project site. Therefore, within implementation of PDF AES-1, GRRSP as Amended, development of the planned 32 single-family homes would not result in a significant, adverse effect on a scenic vista, and would not substantially degrade the existing visual character or quality of public views of the site and its surroundings. As a result, impacts would be less than significant requiring no mitigation. Therefore, no new or substantially greater impacts related to scenic vistas or the existing visual character or quality of public views of the site and its surroundings would occur with implementation of the proposed Modified Project when compared to those identified in the 2001 EIR. The proposed Modified Project’s impacts are consistent with the impacts identified in the 2001 EIR and the level of impact (less than significant) remains unchanged from that cited in the 2001 EIR.

Mitigation Measure
No mitigation measures are required.

Impact AES-2: Substantially damage scenic resources, including, trees, rock outcroppings, and historic buildings within a state scenic highway? Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The 2001 EIR concluded SR 91 and Green River Road were not identified as a Scenic Highway or Corridor in the then current General Plan. The current General Plan identifies Palisades Drive and the segment of Green River Road between Palisades Drive and SR 91 as a City Designated scenic corridor, while SR 91 and SR 71 are identified as “State Eligible” scenic highways. Thereby, SR 91 and SR 71 are not officially designated as state scenic highways.

Similar to the Approved Project, development of the Modified Project would be visible from these facilities. Nonetheless, potential visual effects to these facilities is provided as follows based on the Visual Impact Analysis prepared for the Modified Project assessed.

As previously depicted on Figure 4.1-3, the Modified Project site does not contain any visually prominent rock outcroppings, and there are no historic buildings on site. Numerous trees are scattered throughout the property, primarily in association with the existing single-family

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-21
homes in the northeastern portions of the property along the Dominguez Ranch Road frontage and the Green River Road frontage.

As previously discussed, the development of General Commercial uses in the northern portion of the Modified Project site (PA 4) is at a relatively low elevation compared to the surrounding area and completely surrounded by SR 91 and railroad tracks to the north, and Green River Road to the south. There are no scenic resources on this portion of the Modified Project site, such as prominently visible trees, rock outcroppings, or historic buildings. Impacts to scenic highways from development of the General Commercial uses in PA 4 would be less than significant.

Building elevations depicted on Figure 4.1-4 through Figure 4.1-9 from the Visual Impact Analysis visualize the effects of the proposed BPI buildings on Green River Road. The elevations depict street-level views of the BPI Development along Green River Road that is a City designated scenic corridor. As shown within these elevations, the proposed BPI buildings would be developed on level development pads, with manufactured slopes heavily landscaped with trees, shrubs, and groundcover designed to be a buffer between Green River Road and the proposed buildings.

The existing scattered trees onsite would be the only potential scenic resources on this portion of the Project site, however not visually prominent from off-site locations. As seen in Figure

4.1-10, Conceptual Landscape Plan, the existing trees would be replaced with ornamental tree species included as part of the BPI Development’s conceptual landscape plan. Therefore, development of the proposed “Business Park Industrial” buildings would not substantially affect scenic resources visible from nearby scenic highways, and impacts would therefore be less than significant, and no mitigation is required.

Development of the 32 Estate Residential dwelling units in PA 5 would occur in the central portions of the property over approximately 20.39 acres, where there are no visually prominent trees. Although this portion of the property would be visible from off-site locations, the general appearance would continue to be dominated by the existing hillsides and natural vegetation.

Therefore, development of PA 5 would not substantially damage scenic resources visible from nearby City Designated scenic corridors or State Eligible scenic highways, and impacts would be less than significant.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-22
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-23 FIGURE 4.1-4: BUILDING 1 ELEVATIONS (1 of 2)

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-24
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-25 FIGURE 4.1-5: BUILDING 1 ELEVATIONS (2 of 2)

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-26
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-27 FIGURE 4.1-6: BUILDING 2 ELEVATIONS

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-28
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-29 FIGURE 4.1-7: BUILDING 3 ELEVATIONS

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-30
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-31 FIGURE 4.1-8: BUILDING 4 ELEVATIONS

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-32
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES INC., 2024. PAGE: 4.1-33 FIGURE 4.1-9: BUILDING 5 ELEVATIONS

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-34
This Page Intentionally Left Blank
SOURCE: T&B PLANNING, INC., 2024. PAGE: 4.1-35
FIGURE 4.1-10: CONCEPTUAL LANDSCAPE PLAN

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-36
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-37
As stated in the Visual Impact Analysis, the Modified Project would result in a substantial change in the visual character of the property. However, with mandatory compliance of the GRRSP development standards and design guidelines (PDF AES-1), and the site-specific development plans included as part of Precise Plan No. 2020-0004 (PDF AES-2), such compliance would ensure that the Modified Project’s aesthetic design would be aesthetically pleasing and would not substantially damage scenic resources visible from nearby scenic highways. Accordingly, impacts would be less than significant, and no mitigation measures would be required.

Therefore, no new or substantially greater impacts related to scenic resources as viewed from a scenic highway would occur with implementation of the proposed Modified Project when compared to those identified in the 2001 EIR. The proposed Modified Project’s impacts are consistent with those identified in the 2001 EIR and the level of impact (less than significant) remains unchanged from that cited in the 2001 EIR.

Mitigation Measure
No mitigation required.

IMPACT AES-4: Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

As described in the Visual Impact Analysis, the entire Modified Project site (approximately 160 acres) is largely vacant and undeveloped with the exception of the disturbance from the prior equestrian uses and therefore contains no sources of artificial lighting. Implementation of the Modified Project would result in the introduction of new lighting elements to illuminate parking areas, truck docking areas, commercial signage, and building entrances. Lighting elements primarily would be associated with the General Commercial land uses and BPI Development proposed in the northern portions of the site in PAs 1 through 4. Lighting within the planned Estate Residential uses in the southern portions of the site would be minimal and would be limited to residential landscape and safety lighting and lightning from the exterior and interior of the planned residential homes.

Lighting elements on site would be governed by applicable provisions of the City’s Municipal Code (CMC). Specifically, Chapter 17.84 of the City’s Municipal Code requires that “[a]ll areas of exterior lighting shall be designed to direct light downward with minimal spillover onto adjacent residences, sensitive land uses and open space.” In addition, Chapter 17.76 of the City’s Municipal Code requires that “[a]ll outdoor lighting within parking areas shall be designed and arranged with the approval of the City Engineer to restrict to a minimum the

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-38
effects of stray light on adjacent property and city streets.” Such requirements were also stated in the previously certified mitigation measures MM 4.6.1M through MM 4.6.1O.

In order to show compliance with the CMC, the BPI Development’s Precise Plan application materials include photometric plans showing anticipated lighting levels depicted on Figure 4.1- 11, Site Photometrics – Building 1, and Figure 4.1-12, Site Photometrics – Buildings 2, 3, 4 and 5.

The photometric plans demonstrate that proposed lighting associated with the BPI Development would not expose neighboring properties to excessive lighting levels and would not generate lighting levels that could adversely affect daytime or nighttime views in the local area. Photometric plans also would be required in the future prior to development within the General Commercial planned uses in PA 4, which would be required to demonstrate that lighting levels would not adversely affect daytime or nighttime views in the local area. For this reason, the Modified Project’s impacts due to the creation of new sources of substantial light that could adversely affect day or nighttime views in the area would be less than significant with implementation of the GRRSP.

With respect to glare, a majority of the building elements proposed for the BPI Development would consist of tilt-up concrete panels containing ancillary office uses with glass elements.

Similarly, glass elements would be used in the planned General Commercial buildings and Estate Residential structures eventual development in PAs 4 and 5. While window glazing has a potential to result in minor glare effects, such effects would not adversely affect daytime views of surrounding properties, including motorists along adjacent roadways, because the glass elements for the proposed industrial buildings would be low-reflective. Areas proposed for window glazing also would be limited in the BPI Development, as proposed on the application materials and described previously as Project Design Feature, PDF AES-3. The potential for glare would also be further reduced due to landscaping and perimeter walls and fencing associated with the BPI Development. With implementation of PDF AES-3, and MM

4.1.6M through MM 4.1.6O and compliance with the CMC, glare impacts from proposed building elements would be less than significant.

Therefore, no new or substantially greater impacts related to glare would occur with implementation of the proposed Modified Project when compared to those identified in the 2001 EIR. The proposed Modified Project is consistent with the impacts identified in the 2001 EIR and the level of impact (less than significant) remains unchanged from that cited in the 2001 EIR.

Mitigation Measure
The following Mitigation Measures from the previously certified 2001 EIR are applicable to the Modified Project are shown below and further described in detail in Section 4.1.9:
• MM 4.6.1M Visual Intrusiveness of Development, through MM 4.6.1O SOURCE: BASTIEN AND ASSOCIATES, INC., 2021 PAGE: 4.1-39 FIGURE 4.1-11: SITE PHOTOMETRICS - BUILDING 1

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-40
This Page Intentionally Left Blank
SOURCE: BASTIEN AND ASSOCIATES, INC., 2021. PAGE: 4.1-41 FIGURE 4.1-12: SITE PHOTOMETRICS - BUILDINGS 2, 3, 4, & 5

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-42
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-43

4.1.8 CUMULATIVE IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
Less Than Significant Impact/No Changes or No New Information Requiring Preparation of an EIR. As concluded in the preceding analysis, the Modified Project would not change the significance of Aesthetic impacts as compared to the prior 2001 EIR.

The cumulative aesthetics study area for the GRRSP Planning Area is the viewshed from public areas that can view the Project site and locations that can be viewed from the Project site. Consistent with the conclusions in the prior EIR, there are currently no cumulative projects as referenced in Section 2.0 in the vicinity of the GRRSP Planning Area whose impacts would intermingle with the Modified Project and create a cumulatively significant impact related to scenic views, vistas or resources. The Modified Project Site, including the proposed BPI Development and the balance of planned land uses in PAs 4 and 5 would be developed in accordance with the GRRSP as amended, resulting in the development of the planned General Commercial and Estate Residential uses.

Consistent with the conclusions in the prior EIR, there are no cumulative projects in the vicinity whose impacts would intermingle with the Modified Project and create a cumulatively significant degradation of the existing visual character of the site and surroundings. Consistent with the conclusions in the prior EIR, there are no cumulative projects in the vicinity whose impacts would intermingle with the Modified Project that would create cumulatively significant light and glare impacts.

In summary, the Modified Project would not create a cumulatively significant Aesthetic impact similar to the conclusions for the Approved Project as identified in the prior EIR. With implementation of the specific Mitigation Measures from the prior EIR, Project Design Features associated with the GRRSP design guidelines and development standards (i.e., PDF AES-1) and the specific design elements for the BPI Development as contained in the Precise Plan application materials (i.e., PDF AES-2), plus compliance with the City’s Municipal Code and General Plan standards, of the Modified Project in combination with other projects in the area would not result in significant impacts associated with scenic views, scenic resources, degradation of the site or surroundings, or introduction of substantial new source of light and glare.

4.1.9 MITIGATION MEASURES IDENTIFIED IN PRIOR EIR APPLICABLE TO

MODIFIED PROJECT
The following mitigation measures are related to aesthetics were included in the certified 2001 EIR.

4.6.1A: Visual Intrusiveness of Development: The visual intrusiveness of development shall be minimized. Rather than relying on substantial landform

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-44
modification to create artificial building pads, new development shall be designed to fit quietly into the natural character of the area. • Except within bedrock, where manufactured slopes in excess of 5 vertical feet cannot feasibly be avoided, they shall be landform graded. "Landform grading" is a contour grading method which creates artificial slopes with curves and varying slope ratios in the horizontal and vertical planes designed to simulate the appearance of surrounding natural terrain. Grading plans shall identify which slopes are to be landform graded and which are to be conventionally graded.
• Site design should utilize varying setbacks, structure heights, innovative building techniques, and retaining walls to blend structures into the terrain. • Allow for different lot shapes and sizes, as well as the provision of split development pads, with the prime determinant being the natural terrain.

Within the lower elevations of PA 5, allow flag lots in areas where it is demonstrated that the end result is the preservation of natural topography by minimizing grading, and if the lot can be designed to provide adequate visibility for emergency vehicle response.
• Structures shall be sited in a manner that will:
a) fit into the hillside's contour and relate to the form of the terrain; b) retain outward views from the maximum number of units while maintaining the natural character of the hillside;
c) preserve vistas of natural hillside areas and ridgelines from public places and streets; and
d) preserve existing views and allow new dwellings access to views similar to those enjoyed from existing dwellings.
• Streets should follow the natural contours of the hillside to minimize cut and fill. Streets may be split into two, parallel one-way streets (thereby effectively functioning as a two-way street with a median) in steeper areas to minimize grading and blend with the terrain. Cul-de-sacs or loop roads are encouraged where necessary to fit the terrain. On-street parking and sidewalks may be eliminated, subject to City Engineer approval, to reduce required grading.
• Driveways which serve more than one lot (when approved by the Fire Department), as well as diagonal driveways running along contour lines, are encouraged as a means of reducing unnecessary grading, paving, and site disturbance.
• Clustered development is encouraged as a means of preserving the natural appearance of the hillside and maximizing the amount of open space. Under this concept, dwelling units are grouped in the more level portions of the site, while steeper areas are preserved in a natural state. The effect of

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-45
permitted clustering is to enhance the environmental sensitivity of a development project, and facilitate the permanent protection of key features of the natural environment, such as steep slopes, biological habitats, ridgelines, and scenic areas, including the retention of protected open space areas. Clustering is not be used to increase the overall density of an area beyond that which is otherwise permitted by the Specific Plan, nor is clustering to be used to create suburban style subdivisions within the Specific Plan area. All development, including clustered development is to be rural in character.
a) The location of clustered units is to be restricted to portions of a site with less than a 35 percent actual slope.
b) Clustered development must preserve open space in its natural state.

Adequate legal provisions shall be made during additional environmental review of any clustered development projects to ensure the preservation of open space areas in perpetuity.
• The use of retaining walls and structures is encouraged when it significantly reduces site grading. Except where employed to facilitate construction of a residential dwelling, retaining structures shall be located and restricted to 4 vertical feet in height so that they do not become a dominating visual feature. When taller retaining structures are built to accommodate a single family dwelling unit, the retaining structure should be located behind the dwelling so as to be screened from view by the home.
• Where retaining walls face or will be visible from public streets, they should be faced with materials that help blend the wall into the natural character of the terrain.
a) Large retaining walls in a uniform plane should be avoided. Break retaining walls into elements and terraces, and use landscaping to screen them from view.
b) The overall scale and massing of structures shall respect the natural surroundings and unique visual resources of the area by incorporating designs which minimize bulk and mass, follow natural topography, and minimize visual intrusion on the natural landscape.
• Houses shall not be excessively tall so as to dominate their surroundings.

Structures shall be a maximum of 30 feet in height, but may be constructed on split, flat pads contained within a limited envelope parallel to the finished grade, rather than "jutting out" over natural slopes.
• Building forms shall be scaled to the particular environmental setting so as to complement the hillside character and to avoid excessively massive forms that fail to enhance the hillside character.
• Building facades shall change plane or use overhangs as a means to create changing shadow lines to further break up massive forms.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-46
• Wall surfaces facing towards viewshed areas shall be minimized through the use of homes placed on split pads, setbacks, roof pitches, and landscaping.
• Roof lines and elements shall reflect the naturally occurring ridgeline silhouettes and topographical variation, or create an overall variety, that blends with the hillside.
• Architectural style, including materials and colors, should be compatible with the natural setting. The use of colors, textures, materials and forms that will attract attention by not relating to other elements in the neighborhood is to be avoided.
• As part of submittal requirements for tentative tract and parcel maps within PA 5, require that building pads be identified for all proposed development, that tentative maps identify the type of construction (e.g., slab-on-grade, post and beam, etc.), and that tentative maps establish a three-dimensional building envelope for each dwelling.
• Overhead utilities (e.g., electrical, telephone, etc.) should only be permitted under the following circumstances:
a) within the right-of-way of roadways connecting development areas; b) within the rights-of-way of roadways where all lots are 5 acres in size or greater.

In cases where aboveground utilities are permitted within the right-of-way of a roadway, connections to individual dwellings shall be underground. Utilities shall continue to be underground within subdivisions and parcel maps along roadways serving parcels smaller than 5 acres, as currently required. Where overhead utilities are permitted, their adverse visual impact on surrounding properties is to be mitigated through sensitive placement. Clear cutting of vegetation for an overhead utility corridor shall not be permitted.

4.6.1B: The interface between new development and natural open space shall be designed to provide a gradual transition from manufactured areas into natural areas. By extending fingers of planting into existing and sculptured slopes, the new landscape should blend in with the natural vegetation. It is intended that the transition between manufactured areas and natural areas occur sufficiently beyond residential structures so as to permit the development to meet applicable Fire Department brush clearance requirements.

4.6.1C: Planting along the slope side of development shall be designed to allow controlled views out, yet partially screen and soften the architecture. In general, 50 percent screening of new structures with plant materials should be accomplished.

4.6.1D: Trees and shrubs are to be arranged in informal, randomly spaced masses, and shall be placed selectively to reduce the scale of long, steep slopes.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-47

4.6.1E: To protect the public health and safety, development within PAs 1, 5, and 6 shall ensure the ongoing maintenance of manufactured slopes.

4.6.1F: Development within hillside areas shall be conditioned upon the following:
a) Where a manufactured slope over 5 feet in height is created in order to develop a single family dwelling, landowners should be required to record a deed restriction which provides an acknowledgment of the existence of the manufactured slope, requires that such slope be maintained by landowner, and indemnifies the City from damages should the slope fail in the future.
b) In the case of a parcel map or tentative tract map, a declaration of covenants, conditions, and restrictions shall be prepared and recorded providing for the development and maintenance of manufactured slopes over 5 feet in height, and indemnifying the City from damages should the slope fail in the future

4.6.1G: In addition, the applicant for such a land division or subdivision shall include a program and/or make provision for staff for preventive maintenance of manufactured slope areas in excess of 5 feet in height. Such program must be approved prior to approval of a final map, and shall include homeowner slope maintenance requirements and guidelines to be incorporated into the declaration of covenants, conditions, and restrictions.

4.6.1H: A minimum five-year revegetation monitoring and maintenance program is to be required for all development requiring slope bank and/or habitat vegetation.

The revegetation monitoring program shall include monthly inspection for months 1 through 12, quarterly inspection for months 12 through 36, and semiannual inspection for months 36 through 60. Inspections shall be performed by a qualified botanist subject to City approval.

4.6.1I: Primary ridgelines should be protected from any construction activities including, but not limited to roads, structures, water tanks, antennae, utilities, etc. so as to maintain a natural skyline.

4.6.1J: New parcels that have, as their only feasible building site, a primary ridgeline shall not be created. Where the only feasible building site within an existing parcel is on a primary ridgeline, the structure shall be sited at the lowest possible elevation on the site, and along the least visible portion of the ridge upon which a structure can feasibly be constructed.

4.6.1K: Where development is proposed to occur adjacent to a primary ridgeline (a ridge which is visible against the sky as viewed from a public street), it should be set back a sufficient distance so as to be located below the ridgeline. The intent of this requirement is to maintain a natural skyline.

4.6.1L: Planting shall be used along recontoured secondary (non-skyline) ridges to recreate a natural silhouette, and to act as a backdrop for structures. Trees shall be planted to create a continuous linear silhouette since gaps in the planting will not give the desired effect.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-48

4.6.1M: Sources of lighting within the Specific Plan area should be limited to the minimum standard to ensure safe circulation and visibility.

4.6.1N: Street lighting should be limited to intersections and other locations needed to maintain safe access (e.g., sharp curves).

4.6.1O: Exterior lighting for buildings should be of a low profile and intensity.

4.6.2A: Access: Roadways within PA 5 should provide for minimum safe passage of two cars along a paved road section, except in limited circumstances. Within the upper elevations of PA 5, a further reduction in required roadway width for private roadways which will ultimately serve a maximum of four dwellings, based on the maximum allowable density permitted by the Specific Plan, and where not providing such a reduction would effectively preclude access may be permitted upon the approval of the City Engineer. For such roadways, a curbto-curb width which does not allow for passage of two vehicles (minimum 16 feet, measured edge-to-edge) for a distance of up to 150 feet in any one segment may be permitted upon the approval of the City Engineer.

Where such a reduction in roadway width is permitted, owners whose land is served by such a roadway should be required to provide adequate assurance that the roadway will be kept properly maintained at all times. In addition, such landowners will be required to record a deed restriction that prohibits further subdivision of the property, and provides an acknowledgment of this special circumstance. Such owners will also be required to indemnify the City or any other service provider against any liability regarding emergency or nonemergency vehicle access.

4.6.2B: Roadway grades and curves should accommodate safety and emergency vehicles. Existing roadway grade standards shall be applied to all proposed subdivisions and parcel maps. However, the City Engineer may grant exceptions to existing roadway standards for grades and curves where, in his judgement, existing or future access cannot reasonably meet such standards.

These exceptions are to be limited to providing access to a single family dwelling on an existing lot of record along roadways which will ultimately serve a maximum of four dwellings, based on the maximum allowable density in the Specific Plan, and where not providing such an exception would effectively preclude access to an existing lot of record.

Where the City Engineer grants an exception to roadway grade standards, owners whose land is served by such a roadway will be required to provide adequate assurance that the roadway will be kept properly maintained at all times. In addition, such landowners and/or developer will be required to record a deed restriction at the time of tract map recordation that prohibits further subdivision of the property, and provides an acknowledgment of this special circumstance.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AESTHETICS

ENPLANNERS

4.1-49
Such owners will also be required to indemnify the City or any other service provider against any liability regarding emergency or non-emergency vehicle access.

4.6.2C: The provision of adequate flood control and/or erosion control measures for public and private roadways shall occur in a manner consistent with the rural character of PA 5. Require the provision of concrete curbs and gutters to the portions of PA 5 area where they are needed to prevent erosion, as determined by the City Engineer. Within PA 5, rolled curbs are to be the preferred road edge along paved roads where such curbing will be adequate to contain drainage and prevent erosion.

4.6.3A: Preservation of Open Space: Development projects are to be designed to protect habitat values and to preserve significant, viable habitat areas and habitat connections in their natural condition. Manufactured slopes shall be landscaped or revegetated with natural or naturalized, fire-resistant vegetation.

4.1.10 NEW MITIGATION MEASURES APPLICABLE TO MODIFIED PROJECT No new mitigation measures related to aesthetics are required.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AESTHETICS

ENPLANNERS

4.1-50
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-1

4.2 AGRICULTURAL AND FORESTRY RESOURCES

4.2.1 INTRODUCTION
This section provides a summary of applicable impacts and mitigation measures from the 2001 EIR, an overview of existing agricultural and forest resources within the GRRSP Planning Area and surrounding region, a summary of applicable regulations, and analyses of potential changes in impacts to agricultural and forest resources from implementation of the Modified Project in comparison to the Approved Project. No NOP comment letters, or Scoping Meeting comments were received pertaining to this topic.

4.2.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The 2001 EIR determined the Approved Project would not impact Agricultural Resources.

Although impacts related to forest resources were not analyzed in the 2001 EIR because CEQA guidelines at that time did not require such discussion, impact to forest resources will be analyzed below.

The Approved Project impact analysis related to Agricultural Resources as presented in the 2001 EIR as well as any mitigation measures identified to reduce significant impacts are summarized as follows.
a) Affect agricultural resources or operations? (Land Use and Planning) The 2001 EIR concluded the Approved Project would produce no impacts to agricultural resources. At that time, the northern portion of the site south of Green River Road was being used for horse boarding with several pens and corrals located in the northwestern portion of the property. Implementation of the Approved Project would necessitate the removal of the horse boarding activities and associated structures and equipment. Impacts were considered be less than significant. Similar to existing conditions, the Project site was not being used for the production of agricultural crops and does not otherwise contribute to the agricultural productivity of the immediate area, City, region, or state. As the response concluded, the proposed Project would not have an impact on either agricultural production or resources.

Cumulative Impacts
Because the proposed Project would not have an impact on either agricultural production or resources, it can be concluded cumulative impacts would be less than significant as there were no other development projects that would produce impacts that would comingle with those from the Approved Project creating a significant agricultural impact over and above those at the Project level. Therefore, cumulative were determined to be less than significant.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-2

4.2.3 ENVIRONMENTAL SETTING
The GRRSP Planning Area encompasses the area adjacent to Green River Road, east of the SR-91/Green River Road interchange and west of Dominguez Ranch Road. The Project site is largely undeveloped. However, the site is surrounded by residential development to the north (beyond the SR-91), vacant and disturbed land to the south, residential and commercial development to the east, and vacant and disturbed land to the west. Vacant areas are mostly covered with native vegetation, much of which consists of low-lying scrub. Elevations on site range from 1,110 feet in the southwestern corner of the property to 515 feet in the northeastern corner of the property.

The southern portion of the property is in an undeveloped natural condition dominated by rugged hillside terrain of the Santa Ana Mountains vegetated by grass, brush, scrub, and chaparral. Due to the topography of the property, development has been limited to the northern portion of the Specific Plan area. The eastern portion of the GRRSP Planning Area is occupied by two single-family residences. Several equestrian stables, one above water reservoir and a concrete lined stormwater basin related to prior horse boarding operations remain on-site.

The current Farmland Monitoring and Mapping Program (FMMP) map identifies the Project site, which consists of the ±160-acre Project site as having the following designations:

Grazing Land: Existing vegetation is suited to the grazing of livestock.

Urban and Built-up Land: Urban and Built-Up land is occupied by structures with a building density of at least 1 unit to 1.5 acres, or approximately 6 structures to a 10-acre parcel. Common examples include residential, industrial, commercial, institutional facilities, cemeteries, airports, golf courses, sanitary landfills, sewage treatment, and water control structures.

Other Land: land not included in any other mapping category. Examples include low density rural developments.

Farmland of Local Importance: Land of importance to the local agricultural economy as determined by each county's board of supervisors and a local advisory committee.

The Project site does not contain any land defined as prime or farmland of statewide importance, forest land (as defined by Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or land zoned Timberland Production (as defined by Government Code section 51104(g)).

4.2.4 PROJECT DESIGN FEATURES (PDF)
No Project Design Features are proposed for the Modified Project.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-3

4.2.5 EXISITNG REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL REGUALTIONS
There are no federal regulations that apply to the Modified Project.

STATE REGULATIONS
California Land Conservation Act (CLCA)
The CLCA of 1965, also known as the Williamson Act (California Government Code § 51200, et seq.), enables local governments to enter into contracts with private landowners for the purpose of restricting specific parcels of land to agricultural or related open space use. In return, landowners receive property tax assessments that are much lower than normal because they are based upon farming and open space uses as opposed to full market value. Pursuant to California Government Code § 51230, counties and cities may establish Agricultural Preserves, which define boundaries of those areas within which the city or county will be willing to enter into contracts pursuant to the CLCA. Contracts pursuant to the CLCA are only allowed for areas within established Agricultural Preserves. Agricultural Preserves generally must be at least 100 acres in size; however, a city or county may allow for lesser acreage if a finding is made that the characteristics of the agricultural enterprises in the area are unique and that the establishment of preserves of less than 100 acres is consistent with the general plan of the county or city. Once established, land uses within an Agricultural Preserve must be agricultural in nature, or other such uses that are not incompatible with agricultural uses. (CDC, 2019; CA Legislative Info, n.d.)
Farmland Mapping and Monitoring Program (FMMP)
The goal of the CDC’s FMMP is to provide consistent, timely, and accurate data to decision makers for use in planning for the present and future of California's agricultural land resources.

To meet this goal, the FMMP's objective is to provide maps and statistical data to the public, academia, and local, state, and federal governments to assist them in making informed decisions for the best utilization of California's farmland. The FMMP was established in 1982 in response to what was by then a critical need for data on the nature, location, and extent of farmland, grazing land, and urban built-up areas in the State. California Government Code § 65570 mandates FMMP to biennially report to the Legislature on the conversion of farmland and grazing land, and to provide maps and data to local government and the public. The FMMP was also directed to prepare and maintain an automated map and database system to record and report changes in the use of agricultural lands. It was the intent of the Legislature and a broad coalition of building, business, government, and conservation interests that FMMP be non-regulatory, and provide a consistent and impartial analysis of agricultural land use and change in California. With this in mind, FMMP provides basic data from which observations and analyses can be made in the land use planning process. Pursuant to the FMMP, all lands

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-4
within California are classified into one of seven map categories, as previously summarized in subsection 4.2.1. (CDC, 2004)
California Forest Practice Act
The California Department of Forestry and Fire Protection (CAL FIRE) enforces the laws that regulate logging on privately-owned lands in California. The Forest Practice Act was enacted in 1973 to ensure that logging is done in a manner that will preserve and protect fish, wildlife, forests and streams. The State Board of Forestry and Fire Protection (BFFP) enacts and enforces additional rules to protect these resources. (CAL FIRE, n.d.)

REGIONAL REGULATIONS
There are no regional regulations that apply to the Modified Project.

LOCAL REGULATIONS
Corona Municipal Code
The City of Corona’s Municipal Code has an Agricultural zone defined by Chapter 17.06 and two overlay zones of Agricultural Products (AP) and Animal Keeping and Agricultural Operation (AA), defined by Chapter 17.62 that allow for agricultural uses. The agriculture (A) zone was developed to accommodate the agricultural land uses that existed in Corona before urbanization. The AP overlay zones was originally developed during the early 1980s to allow the retail sale of agricultural products on land where the product is grown and has an Agricultural zone. The AA overlay zone was created in 2013 when the city attempted to annex Temescal Valley.

City of Corona 2020-2040 General Plan
Healthy Communities Element
Policy HC-3.1 Allow for limited agricultural uses, including community gardens, in areas of the city that are consistent with land use, zoning, and permitting requirements.

Environmental Resources Element
Policy ER-8.1 Cooperate with federal and state agencies to achieve the sustainable conservation of forest lands as a means of providing open space and protecting natural resources and MSHCP habitat.

Policy ER-8.2 Support conservation programs to reforest privately held forest lands.

Policy ER-8.3 Work with Riverside County to update the Vegetation Map for Corona and the SOI areas in cooperation with the California Department of Fish and Wildlife, the Natural Diversity Data Base, the United States Forest Service, and other knowledgeable agencies.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-5

4.2.6 THRESHOLDS OF SIGNIFICANCE
Based on the relevant CEQA Guidelines as currently implemented by the City of Corona, significant agricultural and forest resources impacts would occur if the proposed Project or any Project-related component would:

Threshold AGF-1 Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
Threshold AGF-2 Conflict with existing zoning for agricultural use or a Williamson Act contract?
Threshold AGF-3 Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
Threshold AGF-4 Result in the loss of forest land or conversion of forest land to non-forest use?
Threshold AGF-5 Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to nonagricultural use or conversion of forest land to non-forest use?

METHODOLOGY
The following analysis was used to assess the potential impacts of the Modified Project on agricultural and forestry resources. Review of existing data sources, such as the California Department of Food and Agriculture's Farmland Mapping and Monitoring Program (FMMP) and the US Forest Service's Forest Inventory and Analysis (FIA) program was used to identify the agricultural and forestry resources in the Project area. In addition, assessment of the Modified Project’s potential impacts on agricultural and forestry resources included evaluation of the potential to convert agricultural land to non-agricultural uses, to disrupt agricultural operations, or to damage forestry resources.

Desktop analysis was used to review existing data sources on agricultural and forestry resources in the Project area. The following data sources were used to assess the potential impacts of the project on agricultural and forestry resources:
• California Department of Food and Agriculture's Farmland Mapping and Monitoring Program (FMMP)
• US Forest Service's Forest Inventory and Analysis (FIA) program

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-6
• National Agricultural Statistics Service
• California Department of Forestry and Fire Protection • Local agricultural and forestry agencies

4.2.7 ENVIRONMENTAL IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
Impacts
Would the
Modified
Project result
in new or
more severe
impacts
requiring
revisions to
the Prior
EIR?
Would the Modified
Project be
implemented under
changed
circumstances
resulting in new or
more severe impacts
requiring revisions
to the Prior EIR?
Is there new
information that
would result in
new or more
severe impacts
from the
Modified Project
requiring
revisions to the
Prior EIR?
Would the
Modified
Project result in
eliminated,
reduced, or no
changes to
impacts and no
changes to the
Prior EIR are
required?
Would the project:

AGF-1 Convert Prime Farmland,
Unique Farmland, or
Farmland of Statewide
Importance (Farmland), as
shown on the maps
prepared pursuant to the
Farmland Mapping and
Monitoring Program of
the California Resources
Agency, to nonagricultural use?
AGF-2 Conflict with existing
zoning for agricultural use
or a Williamson Act
contract?
AGF-3 Conflict with existing
zoning for, or cause
rezoning of, forest land
(as defined in Public
Resources Code section
12220(g)), timberland (as
defined by Public
Resources Code section
4526), or timberland
zoned Timberland
Production (as defined by
Government Code section
51104(g))?
AGF-4 Result in the loss of forest
land or conversion of
forest land to non-forest
use?

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-7
AGF-5 Involve other changes in
the existing environment,
which, due to their
location or nature, could
result in conversion of
Farmland to nonagricultural use or
conversion of forest land
to non-forest use?

IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT
Impact AGF-1: Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

No changes in the location, size, or boundaries of the GRRSP Planning Area boundary have occurred since adoption of the GRRSP in 2001. As discussed in the Project Description, the Modified Project would modify the size and boundaries of the GRRSP, however minimally in the northern portion of the Project site. In addition, the eastern portion of the Project site has been slightly expanded to incorporate appropriate grading limits within the hilly terrain.

Since certification of the EIR in 2001, a revised Important Farmland Map has been issued by the Farmland Mapping and Monitoring Program of the California Resources Agency. Based on the revised California Important Farmland Map (Department of Conservation, 2022) and similar to the analysis within the 2001 EIR, there are no Prime and Unique Farmland within the Specific Plan area. However, the Farmland of Local Importance located on the GRRSP Planning Area (northeastern) designated by the FMMP is not designated as such in the General Plan EIR, Figure 5.2-1, Agricultural Resources. Although the Modified Project increases the GRRSP Planning Area, the Modified Project would have no change in impacts in comparison to those identified in the 2001 EIR. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
No mitigation measures are required.

Impact AGF-2: Conflict with existing zoning for agricultural use or a Williamson Act contract?

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-8
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The Modified Project would not include any new the land use designations beyond those previously analyzed in the 2001 EIR. Therefore, the Project would not conflict with an existing zoning for an agricultural use. As stated in the City’s General Plan EIR, a Williamson Act contract for a preserve in the City was terminated, and there were no Williamson Act contracts in the City. However, the General Plan EIR concluded development of the General Plan would convert Williamson Act Land to nonagricultural uses and the associated loss of agricultural preserve lands under would be significant and unavoidable.

As previously stated, there are no lands currently within the City that are in an existing Williamson Act contract. As a result, no conflicts with Williamson Act contract lands would occur. The Modified Project would result in no conflicts with Williamson Act contract lands.

Although not specifically analyzed in the 2001 EIR, the Modified Project would result in no impact to Williamson Act Contract lands. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR for the Approved Project.

Mitigation Measure
No mitigation measures are required.

Impact AGF-3: Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The Modified Project proposes a minor increase in acreage, and changes to the land use designations within the GRRSP boundary. However, the proposed changes are designed to accommodate build out of the GRRSP and the proposed BPI Development. The GRRSPA would result in minor changes in land uses and these changes would result in no conflicts with existing zoning.

Although not discussed in the 2001 EIR, the City’s General Plan EIR concludes no forest land or timberlands are located within the City. The Cleveland National Forest is southerly adjacent to the City limits, however not within the City. The Modified Project is not zoned for any forest land or timberland uses. No new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-9
Mitigation Measure
No mitigation measures are required.

Impact AGF-4: Result in the loss of forest land or conversion of forest land to nonforest use? Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

As previously discussed in Impact AGF-3, the Modified Project would have no impact on forestland or timberland. The 2001 EIR did not address this topic, however the General Plan EIR determined that there are no current or planned fixed commercial timber operations subject to a Timber Harvesting Plan in southwest Riverside County (CALFIRE) and there are no timber production zones in the City or its SOI. Consequently, implementation of the General Plan Update would not result in loss or conversion of timberland to non-forest uses. It can be concluded the GRRSP Planning Area similarly does not contain any forest land or timberland uses, and implementation of the Modified Project would not result in the conversion of forest land to non-forest uses. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
No mitigation measures are required.

Impact AGF-5: Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to nonagricultural use or conversion of forest land to non-forest use? Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

As discussed above in Impacts AGF-1 through AGF-5, there are no farmlands in the vicinity of the GRRSP Planning Area that would be subject to potential conversion to non-agricultural use, and there are no forest lands in or within the vicinity of the Project. As concluded, the Farmland of Local Importance located on the GRRSP Planning Area (northeastern) designated by the FMMP is not designated as such in the General Plan EIR, Figure 5.2-1, Agricultural Resources. The Modified Project would not convert farmland to non-agricultural uses or forest land to non-forest uses. The Modified Project would not result in impacts to the existing environment, which due to their location or nature, could convert Farmland to non-agricultural use or forest land to non-forest use. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
No mitigation measures are required.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AGRICULTURAL AND FORESTRY RESOURCES

ENPLANNERS

4.2-10

4.2.8 CUMULATIVE IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
Less Than Significant Impact/No Changes or No New Information Requiring Preparation of an EIR.

The Approved Project’s cumulative impacts associated with agricultural and forestry resources was not specifically addressed in the 2001 EIR. However, the cumulative effect of development in the region was already resulting in the conversion of agricultural lands to nonagricultural uses at the time the 2001 EIR was certified. Because agricultural land, including Prime Farmland, Williamson Act land, and land zoned for agricultural operations, is a finite resource, the conversion of Farmland to urban uses, combined with planned and future development in the City and region, represents a significant cumulative impact to agricultural operations and resources that cannot be mitigated. It can be inferred both the Approved and Modified Project would not result in any cumulative impacts associated with farmland and forestry resources because there is no farmland or forestry zoned properties or operations within or near the GRRSP Planning Area. Therefore, the Modified Project would not result in a change in cumulative impacts that would require further analysis and the level of impact would remain the same as can be inferred from the time the 2001 EIR was certified.

4.2.9 MITIGATION MEASURES IDENTIFIED IN PRIOR EIR APPLICABLE TO

MODIFIED PROJECT
No mitigation measures are required.

4.2.10 NEW MITIGATION MEASURES APPLICABLE TO MODIFIED PROJECT No mitigation measures are required.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-1

4.3 AIR QUALITY

4.3.1 INTRODUCTION
This section provides a summary of applicable impacts and mitigation measures from the 2001 EIR, an overview of existing air quality conditions within the GRRSP Planning Area and surrounding region, a summary of applicable regulations, and analyses of potential changes in impacts to air quality from implementation of the Modified Project in comparison to the Approved Project. Mitigation measures are recommended as necessary to reduce significant air quality impacts. NOP comment letters from South Coast Air Quality Management District, Southern California Association of Governments, and California Allied for a Responsible Economy were received pertaining to this topic. No Scoping Meeting comments were received pertaining to this topic.

This section of the Draft SEIR is based in part on the Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Air Quality Impact Analysis, prepared by Urban Crossroads, dated June 12, 2024 (Appendix D-1), and the Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Health Risk Assessment, prepared by Urban Crossroads, dated June 12, 2024 (Appendix D-2).

4.3.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The 2001 EIR screened out from detailed analysis and assessment of impacts associated with:
altering air movement, moisture, or temperature or cause any change in climate; emissions within ¼ mile of school; and burning of wastes as no impact or a less than significant impact was determined. These conclusions were reached because the type of commercial and residential buildings resulting from the GRRSP Plan would not significantly alter existing subregional air movements and none of the land uses GRRSP would significantly alter surrounding levels of moisture, temperature, or local temperatures. In addition, the 2001 EIR determined no schools were located in the Approved Project vicinity and therefore the Approved Project would not emit emissions near schools and the Approved Project would not involve the burning of wastes resulting in no impact. All further impacts were analyzed in detail 2001 EIR.

The Approved Project impact analysis related to air quality as presented in the 2001 EIR as well as any mitigation measures identified to reduce significant impacts are summarized as follows:
a) Conflict with or obstruct implementation of the applicable air quality plan? The 2001 EIR determined the increase in traffic volume resulting from development of the Approved Project would result in more air pollution emission in comparison to the uses that

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-2
could develop on the site per the existing County of Riverside General Plan that existed at that time. The then current Air Quality Management Plan (AQMP) contained air quality attainment goals based on air pollution emissions resulting from population and employment projections provided to SCAG from local agencies. Estimated increases in population and employment resulting from implementation of the Approved Project were determined to be within the population and employment projections provided to SCAG by the County of Riverside.

Consequently, the Approved Project was determined to be consistent with the AQMP and no mitigation was warranted.
b) Violate any air quality standard or contribute to an existing or projected air quality violation?
The 2001 EIR evaluated the significance of construction and operational emissions generated by the Approved Project. Peak grading and construction emissions associated with the Approved Project would exceed the SCAQMD thresholds for the criteria pollutant of NOx and PM10 resulting in a significant impact. Mitigation measures 4.3.1A thru G were identified to be implemented during construction of the Approved Project. Even with implementation of all feasible mitigation measures, the prior EIR determined construction impacts would remain significant and unavoidable.

The 2001 EIR determined area source emissions (stationary source emissions related to operations of a land use) and mobile source emissions (emissions from project related vehicular traffic) associated with the Approved Project would exceed the SCAQMD thresholds for the criteria pollutants CO, ROC, and NOx resulting in a significant impact. Mitigation measures

4.3.2A thru C were identified to be implemented during operations of the Approved Project.

Even with implementation of all feasible mitigation measures, the prior EIR determined operational impacts would remain significant and unavoidable. c) Expose sensitive receptors to substantial pollutant concentrations? The 2001 EIR evaluated the significance of emissions and particulates generated by the Approved Project. Air pollutants generated by the Approved Project would include temporary increased levels of emissions and particulates resulting from grading and construction activities. Air pollutants would be produced from vehicular emissions resulting from project traffic once the planned commercial facilities and residences are occupied. A notable sensitive receptor identified in the 2001 EIR that may be affected by these pollutants was the existing residential subdivision located east of the project on both sides of Dominguez Ranch Road.

However, the CO hot spot analyses determined the Approved Project would not result in CO hot spots impacts. As a result, the Approved Project was determined to have a less than significant impact on local air quality for CO, and no mitigation measures were warranted.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-3
d) Create objectionable odors?
Development of the non-residential land uses proposed by the Approved Project could include typical retail, service commercial, office, light industrial, restaurant and hotel uses. Odors typically associated with these uses are identified with organic material, such as food wastes generated by food and eating establishments. Many temporary or short-term odor releases are potentially associated with construction activity, which include the sources but are not limited to glues, paint, asphalt, and other architectural coatings.

Impacts were determined to be less than significant with proper handling and storage of such materials to prevent significant human exposure to offensive odors. These standard operating procedures, coupled with appropriate setbacks from sensitive off-site uses, were determined to reduce impacts from objectionable odors generated by the Approved Project to less than significant.

Cumulative Impacts
The 2001 EIR determined operational emissions associated with the Approved Project in conjunction with build out of the City's General Plan, would result in significant, cumulative air quality impacts within the Basin. Emissions of NOx during construction of the Approved Project would cumulatively contribute to regional ozone formation, and because the Basin is a non-attainment zone for ozone, this would be a significant air quality impact. Emissions of criteria pollutants and fugitive dust from construction activity would result in localized air quality impacts in the project vicinity. The 2001 EIR determined the Approved Project’s construction emissions would not comingle with construction emissions from other off-site locations and therefore localized air quality impacts would be less than significant. The 2001 EIR concluded that long-term operational stationary and mobile source emissions would contribute to regional criteria pollutant emissions, and these emissions would cumulatively contribute to significant regional air quality impacts. Impacts would be significant and unavoidable even with the implementation of mitigation measures 4.3.2A through C.

4.3.3 ENVIRONMENTAL SETTING
The proposed Project site is within the South Coast Air Basin (SCAB), an area covering approximately 6,745 square miles and bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Los Angeles County portion of the Mojave Desert Air Basin is bounded by the San Gabriel Mountains to the south and west, the Los Angeles / Kern County border to the north, and the Los Angeles / San Bernardino County border to the east. The Riverside County portion of the Salton Sea Air Basin is bounded by the San Jacinto Mountains in the west and spans eastward up to the Palo Verde Valley.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-4
Climate
The regional climate significantly affects the air quality in the SCAB because temperature, wind, humidity, precipitation, and sunshine all play a role. The SCAB including the GRRSP Area has a semi-arid climate with mild temperatures and low rainfall. However, the presence of a marine layer creates moist air near the surface, especially along the coast. This marine layer combined with sunshine are key factors in photochemical smog formation. Wind is also crucial for air quality as it disperses pollutants. Wind patterns vary throughout the year, with some seasonal winds like the Santa Ana winds contributing to higher air pollution.

Temperature inversions act as a lid over the SCAB, trapping pollutants near the ground. These inversions are more common in the summer and winter.

Air Quality
Air pollution contributes to a wide variety of adverse health effects. The EPA has established federal national ambient air quality standards (NAAQS) for six of the most common air pollutants: carbon monoxide (CO), lead (Pb), ozone (O3), particulate matter (PM10 and PM2.5), nitrogen dioxide (NO2), and sulfur dioxide (SO2) which are known as criteria pollutants. The California Air Resource Board (CARB) administers the California ambient air quality standards (CAAQS) first established in 1962. The CAAQS addresses the pollutants covered by the NAAQS and establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). However, at this time, H2S and C2H3Cl are not measured at any monitoring stations in the SCAB because they are not considered to be a regional air quality problem.

Generally, the CAAQS are more stringent than the NAAQS. The SCAQMD monitors levels of various criteria pollutants at 37 permanent monitoring stations and 5 single-pollutant source Pb air monitoring sites throughout the air district. On January 5, 2021, CARB posted the 2020 amendments to the state and national area designations.

SCAQMD has designated general forecast areas and air monitoring areas, Source Receptor Areas (SRA) throughout the district in order to provide Southern California residents about the air quality conditions. The GRRSP Planning Area is located within the Corona/Norco Area SRA 22. The Corona/Norco Area monitoring station is located approximately 5.4 miles northeast of the GRRSP Planning Area and reports air quality statistics for PM10 (2020 year).

As the Corona/Norco Area monitoring station does not include statistics for O3, CO, NO2, PM10 (for the 2019 and 2021 years), and PM2.5 the next nearest station was used within the Air Quality Impact Analysis (AQIA) prepared for the proposed Project. The SRA 33 monitoring station is located 10.7 miles northeast of the GRRSP Planning Area and reports air quality statistics for NO2 and PM2.5. Additionally, the Metropolitan Riverside County (SRA 23) monitoring station, located approximately 15.8 miles northeast of the GRRSP Planning Area, is the next nearest monitoring station that reports air quality statistics for O3, CO, and PM10 (for 2019 and 2021). As discussed in the AQIA (Appendix C-1), from 2019 through 2021 the

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-5
ambient air quality standards were exceeded for the study area, which is considered to be representative of the local air quality at the GRRSP Planning Area.

Sensitive Receptors
SCAQMD defines sensitive receptor locations as residential or other locations where sensitive populations may be located. Other sensitive receptor locations include schools, hospitals, convalescent homes, day care centers, and other locations where children, chronically ill individuals, or other sensitive persons could be exposed.

4.3.4 EXISTING REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL REGULATIONS
Federal Clean Air Act
Air quality is federally protected by the Federal Clean Air Act (FCAA) and its amendments.

Under the FCAA, the United States Environmental Protection Agency (EPA) developed the primary and secondary NAAQS for the criteria air pollutants including O3, NO2, CO, SO2, PM10, PM2.5, and lead. Proposed projects in or near nonattainment areas could be subject to more stringent air permitting requirements. The FCAA requires each state to prepare a State Implementation Plan (SIP) to demonstrate how it would attain the NAAQS within the federally imposed deadlines.

The EPA can withhold certain transportation funds from states that fail to comply with the planning requirements of the FCAA. If a state fails to correct these planning deficiencies within two years of Federal notification, the EPA is required to develop a Federal implementation plan for the identified nonattainment area or areas. The provisions of 40 Code of Federal Regulations Parts 51 and 93 apply in all nonattainment and maintenance areas for transportation-related criteria pollutants for which the area is designated nonattainment or has a maintenance plan. The EPA has designated enforcement of air pollution control regulations to the individual states.

STATE REGULATIONS
California Clean Air Act
CARB, which became part of the CalEPA in 1991, is responsible for ensuring implementation of the California Clean Air Act (Assembly Bill [AB] 2595), responding to the FCAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. As noted previously, CARB established the CAAQS for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). Also noted previously, H2S and C2H3Cl are not measured at any monitoring stations in the SCAB because they are not considered to

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-6
be a regional air quality problem and generally, the CAAQS are more stringent than the NAAQS.

Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non-attainment for each CAAQS.

Serious non-attainment areas are required to prepare an AQMP that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include:
• Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g. motor vehicle use generated by residential and commercial development);
• A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions;
• Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators; • Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for ROGs, NOX, CO and PM10. However, air basins may use alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances.

California Title 24 Energy Efficiency Standards and California Green Building Standards
California Code of Regulations (CCR) Title 24 Part 6: The California Energy Code was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption.

The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on January 1, 2009, and is administered by the California Building Standards Commission. CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2022 California Green Building Code Standards that will be effective on January 1, 2023.

Local jurisdictions are permitted to adopt more stringent requirements, as state law provides methods for local enhancements. CALGreen recognizes that many jurisdictions have

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-7
developed existing construction waste and demolition ordinances and defers to them as the ruling guidance provided, they establish a minimum 65% diversion requirement.

The code also provides exemptions for areas not served by construction waste and demolition recycling infrastructure. The State Building Code provides the minimum standard that buildings must meet in order to be certified for occupancy, which is generally enforced by the local building official.

Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas (GHG) emissions. The 2022 version of Title 24 was adopted by the CEC and will be effective on January 1, 2023.

The 2022 Title 24 standards would result in less energy use, thereby reducing air pollutant emissions associated with energy consumption in the SCAB and across the State of California.

For example, the 2022 Title 24 standards require solar photovoltaic systems for new homes, encourage the use of heat pumps for space and water heating, and require homes to be electric ready to ease the adoption of cleaner electric heating, cooking, and EV charging. The CEC anticipates that the 2022 energy code will provide $1.5 billion in consumer benefits and reduce GHG emissions by 10 million metric tons. The proposed Project would be required to comply with the applicable standards in place at the time building permit document submittals are made.

REGIONAL REGULATIONS
South Coast Air Quality Management District
SCAQMD is the air pollution control agency for Orange County as well as the urban portions of Los Angeles, Riverside, and San Bernardino Counties. The agency’s primary responsibility is ensuring that the federal and state ambient air quality standards are attained and maintained in the Basin. The SCAQMD is also responsible for adopting and enforcing rules and regulations concerning air pollutant sources, issuing permits for stationary sources of air pollutants, inspecting stationary sources of air pollutants, responding to citizen complaints, monitoring ambient air quality and meteorological conditions, awarding grants to reduce motor vehicle emissions, and conducting public education campaigns, as well as many other activities. All projects within the Basin are subject to SCAQMD rules and regulations in effect at the time of construction.

As stated previously, the AQMP is the SIP for the Basin. The AQMP is a regional blueprint for implementing air quality standards within the Basin and some portions of the Salton Sea Air Basin that are under SCAQMD’s jurisdiction. The AQMP asserts that the most effective way to reduce air pollution impacts is to reduce emissions from mobile sources. Additionally, the AQMP relies on partnerships between governmental agencies at the federal, state, regional, and local level. These agencies, which are comprised of USEPA, CARB, local governments, Southern California Association of Governments (SCAG) and the SCAQMD, are the primary

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-8
agencies that implement the AQMP programs. The AQMP incorporates the latest scientific and technical information and planning assumptions, including SCAG’s Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), updated emission inventory methodologies for various source categories, and SCAG's latest growth forecasts, as well as includes integrated strategies and measures to meet the NAAQS.

During construction activities, the proposed Project would be subject to applicable rules established by the SCAQMD including, but not limited to:
• SCAQMD Rule 402: A person shall not discharge from any source whatsoever such quantities of air contaminants or other material that cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or that endanger the comfort, repose, health, or safety of any such persons or the public, or that cause, or have a natural tendency to cause, injury or damage to business or property. The provisions of this rule do not apply to odors emanating from agricultural operations necessary for the growing of crops or the raising of fowl or animals.

Odor Emissions. All uses shall be operated in a manner such that no offensive odor is perceptible at or beyond the property line of that use. • SCAQMD Rule 403: This rule is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human-made) fugitive dust sources by requiring actions to prevent and reduce fugitive dust emissions. Rule 403 applies to any activity or human-made condition capable of generating fugitive dust and requires best available control measures to be applied to earth moving and grading activities.

Dust Control, Operations. Any operation or activity that might cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution, which can cause damage to human health, vegetation, or other forms of property, or can cause excessive soiling on any other parcel, shall conform to the requirements of the South Coast Air Quality Management District.
• SCAQMD Rule 1113: This rule serves to limit the Volatile Organic Compound (VOC) content of architectural coatings used on projects in the SCAQMD. This rule applies to any person who supplies, sells, offers for sale, or manufactures any architectural coating for use on projects.
• SCAQMD Rule 1301: This rule provides pre-construction review requirements to ensure that new or relocated facilities do not interfere with progress in attainment of the National Ambient Air Quality Standards (NAAQS), while future economic growth within the SCAQMD is not unnecessarily restricted. The specific air quality goal is to achieve no net increases from new or modified permitted sources of nonattainment air

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-9
contaminants or their precursors. Rule 1301 also limits emission increases of ammonia, and Ozone Depleting Compounds (ODCs) from new, modified or relocated facilities by requiring the use of Best Available Control Technology (BACT). • SCAQMD Rule 2305: The SCAQMD adopted Rule 2305, the Warehouse Indirect Source Rule, on May 7, 2021. Owners and operators associated with warehouses 100,000 square feet (sf) or larger are required to directly reduce NOX and PM emissions, or to otherwise facilitate emission and exposure reductions of these pollutants in nearby communities.
• SCAQMD Rule 461: Rule 461 governs the operation of gasoline stations and requires that all underground storage tanks are equipped with a “California Air Resources Board (CARB) certified” enhanced vapor recovery system, all fill tubes are equipped with vapor tight caps, all dry breaks are equipped with vapor tight seals, a spill box shall be installed to capture any gasoline spillage, and all equipment is required to be properly maintained per CARB regulations. Rule 461 also providers several additional requirements including detailed maintenance, testing, reporting, and recordkeeping requirements for all gas stations.

Although the proposed Project would comply with the above regulatory requirements, it should be noted that emission reductions associated with Rules 402, 1301, 401, 2305, and 461 cannot be quantified in the California Emissions Estimator Model (CalEEMod) and are therefore not reflected in the emissions presented herein. Conversely, Rule 403 (Fugitive Dust) (2) and Rule 1113 (Architectural Coatings) (3) can be modeled in CalEEMod. As such, credit for Rule 403 and Rule 1113 have been taken in the analysis.

LOCAL REGULATIONS
City of Corona 2020–2040 General Plan
Circulation Element
Policy CE-1.4 Design and employ traffic control measures to ensure City streets and roads function with safety and efficiency.

Policy CE-1.7 Limit driveway and local street access on arterial streets to maintain a desired quality of traffic flow. Wherever possible, consolidate driveways and implement access controls during redevelopment of adjacent parcels.

Policy CE-1.10 Require a traffic analysis to be prepared in accordance with the City’s adopted Traffic Impact Study Guidelines and require projects to mitigate impacts on the City’s circulation system that exceed the City’s adopted service thresholds for near term and future conditions.

Policy CE-3.3 Encourage employers to reduce vehicular trips by offering to employees commute trip reduction programs, such as transit fare subsidies, alternative work schedules

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-10
and telecommuting, employer-sponsored van pools or shuttles, ride share programs, and bike share.

Policy CE-4.2 Work with the Riverside Transit Agency to identify needs for additional bus services and enhancements to existing services.

Policy CE-4.5 Encourage employers to reduce single-occupant vehicular trips by providing employee incentives (e.g., reduced rate transit passes).

Policy CE-4.6 Require new development to provide transit facilities, such as bus shelters and turnouts, where deemed necessary, to encourage the use of transit and other alternative forms of transportation.

Policy CE-4.7 Preserve options for expanding future transit use when designing improvements for roadways or redeveloping major developments and including areas for transit facilities.

Policy CE-5.2 Maintain existing pedestrian facilities and encourage new development to provide walkways between and through developments.

Policy CE-5.3 Provide for safe accessibility to and use of pedestrian facilities by people with disabilities to implement accessibility requirements under the American with Disabilities Act.

Policy CE-5.6 Encourage new and existing development to provide accessible and secure areas for bicycle storage. Provide bicycle racks or storage facilities at public facilities and require bicycle parking, storage, and other support facilities as part of new office and retail developments.

Policy CE-5.7 Use easements and/or rights-or-way along flood control channels, public utilities, railroads, and streets wherever possible for bikeways and equestrian and hiking trails.

Policy CE-6.1 Provide primary truck routes on selected arterial streets that will serve the business community while minimizing the impacts of through truck traffic into residential areas.

Policy CE-6.2 Provide appropriately designed and maintained roadways in accordance with local, state, and federal standards for truck routes so that they can safely accommodate truck travel.

Policy CE-6.3 Develop appropriate treatments along local truck routes to minimize noise and vibration impacts on sensitive land uses that are adjacent to or impacted by the truck route.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-11
Policy CE-6.4 Ensure that new development provides adequate on-site truck loading facilities and enforce prohibition of queuing of trucks on public streets or in other areas not intended for such uses.

Policy CE-6.6 Strive to minimize through truck traffic in residential neighborhoods and other areas not intended for such travel, and enforce City codes that restrict or prohibit trucks on certain streets.

Policy CE-7.3 Encourage employers to include strategic parking provisions in new developments, where feasible, to encourage the use of transit and other modes of travel rather than single-occupancy autos.

Policy CE-7.4 Accommodate joint use of parking facilities as part of an area plan or site plan, based on the peak parking demands of permitted uses in the planning area.

Land Use Element
Policy LU-1.2 Emphasize the development of uses that sustain Corona as a cohesive, distinct, and self- sustaining community and minimize the need for residents to travel to surrounding communities for retail goods, services, and employment.

Policy LU-6.1 Promote sustainable features in new construction and significant renovations, including the use of locally sourced, recycled, and sustainable-sourced building materials, energy- and water-efficient building design, integrated renewable energy and energy storage systems, and waste minimization during construction.

Policy LU-6.2 Require that new residential, commercial, office, and industrial development be designed to minimize consumption of and sustain scarce environmental resources through:
• Site design—concentration and intermixing of development to minimize vehicular trips and promote walking and building orientation for solar access and heat gain and loss. • Landscaping—drought-tolerant species, use of recycled water for irrigation, and other purposes.
• Capture of rainwater and re-use on site.
• Building design and construction materials—energy-and water efficient fixtures, recycled building materials, insulation and wall thickness, permeable paving surfaces, and comparable techniques.

Policy LU-10.6 Establish a multi-use trail system that connects the rural and estate neighborhoods adjoining open spaces and parklands. These may be developed for pedestrians, bicycles, and/or for horseback riding where allowed by zoning.

Policy LU-11.6 Require that transit-supporting facilities, such as bus turnouts, passenger drop-offs, and shelters, be incorporated in new commercial centers or when subject to major

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-12
renovation and improvement, where appropriate to support local, citywide, and regional transit systems. The location and type of facility should be coordinated with transit agencies.

Policy LU-12.7 Regulate the development of industrial uses (consistent with local regulation and state law) that use, store, produce, or transport toxic and hazardous materials; generate unacceptable levels of air or noise pollution; or result in other adverse impacts.

Policy LU-13.2 Limit retail commercial and professional office uses within a mixedresidential- commercial/office use development to those uses that are compatible with residential uses.

Policy LU-13.3 Require that adequate open space and, for larger projects, recreational facilities be incorporated into mixed-use development projects to meet the need of their residents and improve overall aesthetics.

Healthy Community Element
Policy HC-2.5 Require the preparation of air quality, noise, and vibration technical studies to determine the impact of proposed new development on adjacent and surrounding land uses and to identify the appropriate measures required to mitigate such impacts.

Housing Element (2021-2029)
Policy H-1.2 Promote specific plans and zoning map amendments that provide a variety of housing types and densities based on the suitability of the land, including the availability of infrastructure, the provision of adequate City services and recognition of environmental constraints.

Policy H-1.4 Support the development of sustainable projects that reduce demand for water and energy resources, reduce commute times and operational costs, and provide for transitoriented development.

Environment Resources Element
Policy ER-12.1 Promote and encourage alternate employment work schedules for public- and private-sector businesses to achieve a reduction of employee-related motor vehicle emissions in accordance with SCAQMD Rule 2202.

Policy ER-12.2 Continue to cooperate with the SCAQMD and other local authorities in the air basin, in implementing air emission reduction programs and techniques.

Policy ER-12.3 Establish and strictly enforce controls on land use activities that contain operations or materials that individually or cumulatively add significantly to the degradation of air quality in Corona.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-13
Policy ER-12.6 Support major commercial centers and employment center projects, having 100 or more employees, to incorporate transit amenities, access points, and van and carpool parking as part of the project.

Policy ER-12.8 Require new commercial and industrial development and redevelopment projects of sufficient scale and number of employees to provide adequate facilities for bicycles, such as bicycle racks located close to the front entranceways of buildings and shower facilities with lockers.

Policy ER-12.9 Continue to incorporate bicycle lanes in all new and upgrade roadway projects in order to encourage commuter bicycle trips. Also, improve existing bicycle lanes for greater user safety.

Policy ER-12.11 Require that large-scale master-planned residential communities incorporate pedestrian and cycling paths/trails that link with adjacent neighborhoods, schools, areas of shopping and employment, community centers, other places of activity, and transit access points.

Policy ER-12.12 Provide effective utility of pedestrian and cycling paths/trails and place strong limitations on intrusions into these rights-of-way used for pedestrian and bicycling.

Policy ER-12.13 Reduce particulate emissions from paved and unpaved roads, parking lots, and road and building construction through the implementation of best practices as deemed feasible by the City of Corona.

Policy ER-12.14 Reduce energy consumed by commercial and residential uses by requiring the use and installation of energy conservation features in all new construction projects and wherever feasible, retrofitting existing and redevelopment projects.

Policy ER-13.2 Encourage the maximum feasible energy efficiency in site design, building orientation, landscaping, and utilities/infrastructure for all development and redevelopment projects (residential, commercial, industrial, and public agency) to support GHG emissions reductions.

Policy ER-13.3 Evaluate opportunities to reduce energy use and the urban heat island effect through site and building design, materials and landscaping, such as reflective roofs or pavement, vegetated roofs, pervious pavement, shade trees, and re-vegetation of paved areas.

Policy ER-13.4 Support the increase of clean energy supply to existing and new development and municipal facilities through means to include, but not be limited to: onsite or other local renewable energy sources for new and existing buildings and infrastructure.

Policy ER-13.5 Increase use of clean fuel and electric vehicles in the city through the support of the installation of electric vehicle infrastructure; explore opportunities to incentivize and/or facilitate installation of electric vehicle charging stations at convenient locations in Corona.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-14
Policy ER-13.6 Reduce solid waste sent to the landfills and associated community-wide GHG emissions by ensuring all properties have access to curbside solid waste, recycled materials, and green/organic waste programs; target special programs for construction debris, household hazardous waste, etc.

Policy ER-13.7 Support a wide variety of transportation related measures (e.g., active transportation, increased bus and rail transit, transportation system and demand management, etc.) as articulated in the Circulation Element to reduce the number of vehicle miles traveled in Corona.

Infrastructure and Utilities Element
Policy IU-7.7 Encourage the reduction of energy consumption through passive solar building orientation as well as the installation of rooftop solar energy systems and energyefficient technologies.

4.3.5 PROJECT DESIGN FEATURES
No Project Design Features are proposed for the Modified Project.

4.3.6 THRESHOLDS OF SIGNIFICANCE
Based on the relevant CEQA Guidelines as currently implemented by the City of Corona, significant air quality impacts would occur if the proposed Project or any Project-related component would:

Threshold AQ-1 Conflict with or obstruct implementation of the applicable air quality plan?
Threshold AQ-2 Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Threshold AQ-3 Expose sensitive receptors to substantial pollutant concentrations? Threshold AQ-4 Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?

METHODOLOGY
Air quality impacts were assessed in accordance with methodologies recommended by CARB and the SCAQMD. The latest version of CalEEMod (v2022.1), which was released by the SCAQMD in conjunction with CAPCOA and other California air quality districts in May 2022, was used to determine construction and operational air quality emissions of the Modified Project. CalEEMod is a statewide land use emissions computer model designed to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. Project construction-generated air pollutant emissions were

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-15
calculated using CalEEMod model defaults for Orange County. Construction of the proposed Project is anticipated to start in the first quarter of 2024 and the first phase (PAs 1, 2, and 3) would be completed and operational by 2024 and buildout of the Project (phase one plus PAs 4 and 5) operational by third quarter of 2025. Operational air pollutant emissions were based on the proposed Project site plans and the estimated traffic trip generation rates from the Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Traffic Analysis, dated June 10, 2024, and prepared by Urban Crossroads (Appendix S).

4.3.7 ENVIRONMENTAL IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
Impacts
Would the
Modified
Project result
in new or
more severe
impacts
requiring
revisions to
the Prior
EIR?
Would the Modified
Project be
implemented under
changed
circumstances
resulting in new or
more severe impacts
requiring revisions to
the Prior EIR?
Is there new
information that
would result in
new or more
severe impacts
from the
Modified Project
requiring
revisions to the
Prior EIR?
Would the
Modified Project
result in
eliminated,
reduced, or no
changes to
impacts and no
changes to the
Prior EIR are
required?
Would the project:

AQ-1 Conflict with or obstruct
implementation of the
applicable air quality
plan?
AQ-2 Result in a cumulatively
considerable net
increase of any criteria
pollutant for which the
project region is nonattainment under an
applicable federal or
state ambient air quality
standard?
AQ-3 Expose sensitive
receptors to substantial
pollutant
concentrations?
AQ-4 Result in other emissions
(such as those leading to
odors) adversely
affecting a substantial
number of people?

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-16

IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT
Impact AQ-1: Conflict with or obstruct implementation of the applicable air quality plan?
The Modified Project result in new or more severe impacts requiring revisions to the 2001 EIR.

Projects are considered consistent with the AQMP if the growth in socioeconomic factors (e.g., population, employment) is consistent with the underlying regional plans used to develop the AQMP. The future emissions forecasts are primarily based on demographic and economic growth projections provided by SCAG. Thus, demographic growth forecasts for various socioeconomic categories developed by SCAG in their current 2020-2045 RTP/SCS were in turn used to estimate future emissions by SCAQMD in their current 2022 AQMP (SCAQMD 2022).

Pursuant to SCAQMD’s consistency analysis guidelines contained in their CEQA Air Quality Handbook, consistency with the AQMP is affirmed when a project: (1) does not increase the frequency or severity of an air quality standards violation or cause a new violation; and (2) is consistent with the growth assumptions in the AQMP.

AQMP Consistency Criterion 1: The Modified Project would result in long-term operational pollutant emissions that exceed CEQA significance emissions thresholds established by SCAQMD, as demonstrated below; therefore, the proposed Modified Project would result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP. A detailed discussion of this conclusion follows.

As shown below in Table 4.3-1, the Modified Project construction-source emissions would exceed SCAQMD regional thresholds for NOX emissions. However, with implementation of Mitigation Measure, MM AQ-1 as presented in Section 4.3.10, the Modified Project construction source emissions impacts would be reduced to less than significant as shown in Table 4.3-2. Implementation of MM AQ-1 requires that all grading construction contractors ensure offroad diesel construction equipment complies with EPA/CARB Tier 4 Interim emissions standards or equivalent and ensure that all construction equipment is tuned and maintained in accordance with the manufacturer’s specifications. As a result, the Modified Project would not exceed the applicable regional significance thresholds for construction activity with mitigation incorporated. Thus, construction activities related to the Modified Project would be consistent with the first criterion.

As shown below in Table 4.3-3, the Modified Project’s long-term operational activities would exceed summer VOC emissions thresholds and NOX emissions thresholds for both summer and winter. As a result, the Modified Project has the potential to exceed the applicable regional

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-17
significance thresholds during operational activities. The Modified Project is required to comply with SCAQMD Rule 2305, the Warehouse Indirect Source Rule, which requires owners and operators associated with warehouses 100,000 square feet or larger are required to directly reduce NOX and PM emissions, or to otherwise facilitate emission and exposure reductions of these pollutants in nearby communities. As such, the Modified Project would be required to incorporate Mitigation Measures, MM AQ-2 through MM AQ-5 to reduce operational-related emissions, specifically designed to improve truck efficiency. However, the estimated long-term operational emissions generated under full buildout of the Modified Project would exceed the SCAQMD’s regional operational significance thresholds. In addition, Project operational-source VOC emissions during summer cannot be definitively reduced below applicable SCQMD thresholds and therefore would therefore exceed regional operational significance thresholds.

The proposed Project’s main operational-source emissions source would be generated by passenger cars and trucks accessing the Modified Project, and no feasible mitigation beyond the measures to be implemented exist that would reduce Project operational-source VOC and NOX emissions to levels that are less than significant. As a result, the Modified Project would conflict with the AQMP according to this criterion.

AQMP Consistency Criterion 2: The Modified Project would not exceed the growth assumptions in the AQMP. The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to SCAG, which develops regional growth forecasts, which are then used by SCAQMD to develop future air quality forecasts for the AQMP. The Approved Project land uses are consistent with the City’s GP and are therefore consistent with the AQMP growth projections. The Modified Project’s land uses are less intense than the Approved Project, and therefore are also consistent with the AQMP growth projections.

Per the City’s General Plan, PAs 1, 2, and 3 are designated for MU2 and GC uses, and PAs 4 and 5 are designated for MU2 and ER in accordance with the Approved Project. The MU2 land use designation allows for light industrial and commercial uses. The GC land use designation allows for the development of supermarkets, department stores, apparel stores, theaters, and nonretail uses such as offices and banks. The ER land use designation includes the development of single-family homes, light agriculture uses, and accessory buildings. The Modified Project’s proposed uses and development would be consistent with the land use designation intensities stated in the General Plan and the Approved Project (i.e., the GRRSP.

The Project would exceed the applicable SCAQMD regional thresholds for operational-source activity for emissions of summer VOC and NOX. Even with implementation of feasible mitigation, this threshold exceedance is considered significant and unavoidable. Thus, the Modified Project would have the potential to conflict with the second criterion.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-18
As previously discussed, Modified Project operational-source emissions would exceed the applicable SCAQMD regional thresholds for summer VOC and NOX with mitigation incorporated. In addition, the Project’s proposed land use designation for the GRRSP Planning Area would potentially affect the development intensities. As a result, the Project would conflict with the AQMP and result in a significant and unavoidable impact.

In summary, the Modified Project would result in a new increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.

The Modified Project would result in new or more severe impacts in comparison to those identified for the Approved Project in the 2001 EIR.

Mitigation Measure
The Modified Project introduces the following Mitigation Measures and are further described in detail Section 4.3.10.
• MM AQ-1 through AQ-5
Impact AQ-2: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The CAAQS designate the Modified Project area as nonattainment for O3, PM10, and PM2.5 while the NAAQS designates the Modified Project area as nonattainment for O3 and PM2.5. As presented in the AQIA , the analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which SCAB is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project-related construction and operational emissions that exceed SCAQMD thresholds for project-specific impacts would be considered cumulatively considerable.

Construction Impacts
As detailed in the AQIA , the estimated maximum daily construction emissions without mitigation are summarized on Table 4.3-1 below. Under the assumed scenarios, emissions resulting from the Modified Project construction will exceed thresholds established by the SCAQMD for emissions of NOX during construction activity. The exceedance is a result of on-site equipment operations occurring during the 2024 grading activities.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-19
Table 4.3-1: Overall Construction Emissions Summary – Without Mitigation Phase
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
2024 33.76 105.22 77.06 0.30 16.80 7.77
2025 14.03 40.35 46.59 0.07 4.47 2.44
Winter
2024 33.63 106.55 72.64 0.30 16.80 7.90
2025 4.12 37.58 33.46 0.06 7.83 4.52
Maximum Daily Emissions 33.76 106.55 77.06 0.30 16.80 7.90 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? NO YES NO NO NO NO
Source: Urban Crossroads, 2024 (Appendix C-1)
The estimated maximum daily construction emissions with mitigation are summarized on Table 4.3-2 below. As presented above in Impact AQ-1, implementation of MM AQ-1 would be required to reduce the severity of the impacts from construction equipment. As a result, construction-source emissions would be reduced below the applicable SCAQMD thresholds.

Therefore, with implementation of MM AQ-1, Modified Project construction-source emissions would be less than significant with mitigation.

Table 4.3-2: Overall Construction Emissions Summary – With Mitigation Phase
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
2024 33.76 69.91 82.95 0.30 13.62 4.86
2025 14.03 40.35 46.59 0.07 4.47 2.44
Winter
2024 33.63 71.24 82.26 0.30 13.62 7.90
2025 4.12 37.58 33.46 0.06 7.83 4.52
Maximum Daily Emissions 33.76 71.24 82.95 0.30 13.62 7.90 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Source: Urban Crossroads, 2024 (Appendix C-1)

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-20
Operational Impacts
Operational activities associated with the Project will result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Operational emissions are expected from the following primary sources:
• Area Source Emissions
• Energy Source Emissions
• Mobile Source Emissions
• On-Site Cargo Handling Equipment Emissions
• Transportation Refrigeration Unit (TRU) Emissions
• Gasoline Dispensing Emissions
Table 4.3-3: Summary of Peak Operational Emissions – Without Mitigation Phase
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Mobile Source 35.63 59.42 282.46 0.95 67.91 18.03
Area Source 25.13 0.78 35.92 0.01 0.10 0.08
Energy Source 0.35 6.36 5.22 0.04 0.48 0.48
Stationary Sources 4.92 13.76 12.55 0.02 0.72 0.72
On-site Equipment 0.35 1.13 49.33 0.00 0.09 0.08
TRU Source 12.56 13.33 1.50 0.00 0.48 0.44
Fueling Station Source 1.22 0.00 0.00 0.00 0.00 0.00
Total Maximum Daily
Emissions

80.17 94.77 386.99 1.01 69.79 19.85
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? YES YES NO NO NO NO
Winter
Mobile Source 33.37 62.85 241.24 0.91 67.91 18.03
Area Source 19.40 0.48 0.20 0.00 0.04 0.04
Energy Source 0.35 6.36 5.22 0.04 0.48 0.48
Stationary Sources 4.92 13.76 12.55 0.02 0.72 0.72
On-site Equipment 0.35 1.13 49.33 0.00 0.09 0.08

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-21
TRU Source 12.56 13.33 1.50 0.00 0.48 0.44
Fueling Station Source 1.22 0.00 0.00 0.00 0.00 0.00
Total Maximum Daily
Emissions 72.18 97.90 310.06 0.97 69.73 19.80
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? YES YES NO NO NO NO
Source: Urban Crossroads, 2024 (Appendix C-1)
As shown above in Table 4.3-3, the Modified Project’s operational‐source NOX emissions will exceed applicable SCAQMD regional thresholds without implementation of mitigation resulting in a significant impact requiring mitigation.

As previously stated in Impact AQ-1, the Modified Project would be required to incorporate Mitigation Measures, MM AQ-2 through MM AQ-5 to reduce operational-related emissions.

The estimated maximum daily operational emissions with mitigation are summarized on Table

4.3-4 below.

Table 4.3-4: Summary of Peak Operational Emissions – With Mitigation Phase
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Mobile Source 35.63 59.42 282.46 0.95 67.91 18.03
Area Source 25.13 0.78 35.92 0.01 0.10 0.08
Energy Source 0.35 6.36 5.22 0.04 0.48 0.48
Stationary Sources 4.92 13.76 12.55 0.02 0.72 0.72
On-site Equipment 0.35 1.13 49.33 0.00 0.09 0.08
TRU Source 12.56 13.33 1.50 0.00 0.48 0.44
Fueling Station Source 1.22 0.00 0.00 0.00 0.00 0.00
Total Maximum Daily
Emissions

79.81 93.64 337.66 1.01 69.70 19.77
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? YES YES NO NO NO NO
Winter

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-22
Mobile Source 33.37 62.85 241.24 0.91 67.91 18.03
Area Source 19.40 0.48 0.20 0.00 0.04 0.04
Energy Source 0.35 6.36 5.22 0.04 0.48 0.48
Stationary Sources 4.92 13.76 12.55 0.02 0.72 0.72
On-site Equipment 0.35 1.13 49.33 0.00 0.09 0.08
TRU Source 12.56 13.33 1.50 0.00 0.48 0.44
Fueling Station Source 1.22 0.00 0.00 0.00 0.00 0.00
Total Maximum Daily
Emissions

71.83 96.77 260.72 0.97 69.64 19.72
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? YES YES NO NO NO NO
Source: Urban Crossroads, 2024 (Appendix C-1)
As shown above in Table 4.3-4, the Modified Project’s operational‐source NOX emissions will exceed applicable SCAQMD regional thresholds with implementation of mitigation resulting in a significant impact requiring mitigation. As stated in the AQIA, no feasible mitigation beyond the measures to be implemented exist that would reduce Project operational-source VOC and NOX emissions to levels that are less than significant. As a result, the Modified Project would result in a significant and unavoidable impact.

As discussed previously, the 2001 EIR determined the Approved Project would produce construction-related impacts from NOx and PM10 emissions and operational-related emissions from CO, ROC, and NOx that would be significant and unavoidable even with implementation of all feasible mitigation measures. Therefore, no new impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

However, additional mitigation measures MM AQ-1 through MM AQ-5 have been identified for the Modified Project to reduce impacts from construction and operations of the Modified Project to the fullest extent feasible.

Mitigation Measure
The Modified Project introduces the following Mitigation Measures and are further described in detail Section 4.3.10.
• MM AQ-1 through MM AQ-5
Impact AQ-3: Expose sensitive receptors to substantial pollutant concentrations? Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-23
Localized Impact Analysis
The AQIA includes a Localized Significance Threshold (LST) analysis based on SCAQMD methodology. The analysis quantified localized impacts (maximum daily emissions) for all nearest sensitive and non-sensitive receptors compared to the thresholds established by the SCAQMD. Consistent with LST Methodology, the LST emissions were calculated using an air dispersion model because the Project exceeds five acres.

During the peak phases of construction, the LST analysis determined no exceedances of SCAQMD thresholds would occur as shown in Table 4.3-5. Impacts would be less than significant. Notwithstanding, implementation of Mitigation Measure MM AQ-1 would further reduce localized emissions in Planning Areas 1, 2, and 3.

Table 4.3-5: Localized Significance Summary of Peak Construction – Without Mitigation Peak Construction
CO NO2 PM10 PM2.5
Averaging Time
1-Hour 8-Hour 1-Hour 24-Hours 24-Hours
Peak Day Localized Emissions 0.02 0.01 1.43E-02 0.59 0.34 Background ConcentrationA 1.70 1.20 0.085 NA NA
Total Concentration 1.72 1.21 0.10 0.59 0.34
SCAQMD LSTB 20 9 0.18 10.4 10.4
Threshold Exceeded? NO NO NO NO NO
A Highest concentration from the last three years of available data. Per SCAQMD LST guidance, PM10 and PM2.5 background concentrations are not considered. B Significance thresholds are based on SCAQMD’s Air Quality Significance Thresholds for Ambient Air Quality Standards for Criteria Pollutants.

Note: PM10 and PM2.5 background concentrations are expressed in ug/m3. All others are expressed in ppm.

Source: Urban Crossroads, 2024 (Appendix C-1)
The LST operational analysis generally includes on-site sources (area, energy, mobile, TRUs, and on-site cargo handling equipment). The Modified Project operational emissions would not exceed the numerical localized thresholds of significance established by the SCAQMD for any criteria pollutant as shown below in Table 4.3-6. Thus, a less than significant impact would occur for localized Project-related operational-source emissions, and no mitigation is required.

Table 4.3-6: Localized Significance Summary of Peak Operations – Without Mitigation Peak Construction
CO NO2 PM10 PM2.5
Averaging Time
1-Hour 8-Hour 1-Hour 24-Hours 24-Hours
Peak Day Localized Emissions 1.96E-02 8.31E-03 3.33E-03 0.15 0.05

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-24
Background ConcentrationA 1.70 1.20 0.085 NA NA
Total Concentration 1.72 1.21 0.09 0.15 0.05
SCAQMD LSTB 20 9 0.18 2.5 2.5
Threshold Exceeded? NO NO NO NO NO
A Highest concentration from the last three years of available data. Per SCAQMD LST guidance, PM10 and PM2.5 background concentrations are not considered.

B Significance thresholds are based on SCAQMD’s Air Quality Significance Thresholds for Ambient Air Quality Standards for Criteria Pollutants.

Note: PM10 and PM2.5 background concentrations are expressed in ug/m3. All others are expressed in ppm.

Source: Urban Crossroads, 2024 (Appendix C-1)
CO Hot Spot Analysis
The AQIA conducted a CO hot spot analysis to determine if the Modified Project's vehicular traffic additions would result in CO concentrations at nearby roadways and intersections that would result in a violation of ambient air quality standards. It has long been recognized that CO hotspots are caused by emissions from vehicles idling at congested intersections. As vehicle emissions standards have become increasingly stringent resulting in the replacement of older vehicles by newer vehicles in the vehicle fleet, plus the introduction of cleaner burning fuels, CO is now designated as attainment in the SCAB. The AQIA determined the Modified Project along with background and cumulative development would not produce the volume of traffic required to generate a CO hot spot based on empirical data derived from a 2003 Los Angeles hot spot study and based on representative Bay Area AQMD CO threshold considerations. Localized air quality impacts related to CO hot spots from the Modified Project’s mobile-source emissions would therefore be less than significant.

Health Risk Analysis Impacts
The Health Risk Assessment (HRA) prepared for the Modified Project evaluated potential health risk impacts to nearby sensitive receptors. The nearest sensitive receptors are the existing homes and residents to the east/southeast of the GRRSP Planning Area off Dominguez Ranch Road and workers associated with future development of the proposed Project. Health risk impacts result from exposure to Toxic Air Contaminants (TACs) including diesel particulate matter (DPM) as a result of heavy-duty diesel trucks accessing the site. The analysis was conducting in accordance with the SCAQMD’s Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile Source Diesel Idling Emissions for CEQA Air Quality Analysis. DPM emissions concentrations were calculated using the EPA’s AERMOD dispersion model using site specific, area climate, and Project inputs. Project data inputs include the detailed construction assumptions for each phase of the Modified Projects development contained in the AQIA. The phases analyzed were: Phase 1 = 746,167 sf of BPI uses in PAs 1, 2, 3; Phase 2 = Phase 1 plus 19,600 sf of GC uses in PA 4; Phase 3 = Phase 2 plus 32 ER DUs in PA 5.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-25
The individual land use with the maximum exposure to emissions from a project is referred to as the maximally individual receptor (MEIR). The MEIR the proposed Project’s construction and operational DPM source emissions was identified as the backyard of an existing residence on San Viscaya Circle approximately 246 feet east of PAs 1, 2 and 3. As shown in Table 4.3- 5, the maximum incremental cancer risk at the MEIR attributable to the proposed Project construction and operational DPM source emissions is estimated at 5.14 in one million, which is less than SCAQMD’s risk threshold of 10 in one million. Also shown in Table 4.3-5, noncancer risks were estimated to be 0.003 at the MEIR, which is less than SCAQMD’s hazard risk threshold of 1.0. The Modified Project will not cause a significant human health or cancer risk to adjacent land uses as a result of construction and operational activity. All other receptors during construction and operational activity would experience less risk than what is identified for this location. Health risk impacts from the Modified Project’s DPM emissions would therefore be less than significant and no mitigation is required.

Table 4.3-5: Summary of Construction and Operational Cancer and Non-Cancer Risks Time Period Location
Maximum
Lifetime Cancer
Risk (Risk per
Million)
Significance
Threshold
(Risk per
Million)
Exceeds
Significance
Threshold
30 Year
Exposure Maximum Exposed Sensitive Receptor 5.14 10 NO
Time Period Location Maximum Hazard
Index
Significance
Threshold
Exceeds
Significance
Threshold
Annual Average Maximum Exposed Sensitive Receptor 0.003 1.0 NO Source: Urban Crossroads, 2024 (Appendix C-1)
As discussed previously, the 2001 EIR determined the Approved Project would not result in emissions that would affect sensitive receptors. The Modified Project would not result in CO hot spot impacts, construction-related LST impacts from NOx and PM10 emissions, or operational-related LST impacts from CO, ROC, and NOx emissions. In addition, the Modified Project would not result in health risk impacts to nearby sensitive receptors. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR for the Approved Project.

Friant Ranch Case
The California Supreme Court held in 2018 that air quality analyses in an EIR must address the connection between identified air quality impacts to the human health consequences of the identified air quality impacts, or meaningfully explain why such an analysis cannot be provided given correlation of a project’s criteria air pollutant emissions to specific health impacts is challenging. SCAQMD expressed at the time it may be “difficult to quantify health impacts

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-26
for criteria pollutants,” an important opinion coming from one of the State’s are districts with the most sophisticated air quality modeling and health impact evaluation capabilities. Using O3 as an example, SCAQMD expressed why it is impracticable to determine specific health outcomes from criteria pollutants for all but very large, regional-scale projects. First, forming O3 “takes time and the influence of meteorological conditions for these reactions to occur, so ozone may be formed at a distance downwind from the sources.” Second, “it takes a large amount of additional precursor emissions (NOX and VOCs) to cause a modeled increase in ambient ozone levels over an entire region,” referencing a 2012 study showing that “reducing NOX by 432 tons per day (157,680 tons/year) and reducing VOC by 187 tons per day (68,255 tons/year) would reduce ozone levels at the SCAQMD’s monitor site with the highest levels by only 9 parts per billion.”
SCAQMD concluded it “does not currently know of a way to accurately quantify ozone related health impacts caused by NOX or VOC emissions from relatively small projects.” The San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) ties the difficulty of correlating the emission of criteria pollutants to health impacts to how ozone and particulate matter are formed, stating that “[b]ecause of the complexity of ozone formation, a specific tonnage amount of NOX or VOCs emitted in a particular area does not equate to a particular concentration of ozone in that area.” Similarly, the quantity of particulate matter “emitted does not always equate to the local PM concentration because it can be transported long distances by wind,” and “[s]econdary PM, like ozone, is formed via complex chemical reactions in the atmosphere between precursor chemicals such as sulfur dioxides (SOX) and NOX,” meaning that “the tonnage of PM-forming precursor emissions in an area does not necessarily result in an equivalent concentration of secondary PM in that area.” The disconnect between the amount of precursor pollutants and the concentration of ozone or PM formed makes it difficult to determine potential health impacts, which are related to the concentration of ozone and PM experienced by the receptor rather than levels of NOX, SOX, and VOCs produced by a source.

Most local agencies lack the data to do their own assessment of potential health impacts from criteria air pollutant emissions, as would be required to establish customized, locally specific thresholds of significance based on potential health impacts from an individual development project. The use of national or “generic” data to fill the gap of missing local data would not yield accurate results because such data does not capture local air patterns, local background conditions, or local population characteristics, all of which play a role in how a population experiences air pollution. Because it is impracticable to accurately isolate the exact cause of a human disease (for example, the role a particular air pollutant plays compared to the role of other allergens and genetics in cause asthma), existing scientific tools cannot accurately estimate health impacts of the proposed Project’s air emissions without undue speculation.

Instead, readers are directed to the proposed Project’s air quality impact analysis above, which provides extensive information concerning the quantifiable and non-quantifiable health risks related to the Project’s construction and long-term operation.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-27
The LST analysis above determined the proposed Project would not result in emissions exceeding SCAQMD’s LSTs. Therefore, the proposed Project would not be expected to exceed the most stringent applicable federal or state ambient air quality standards for emissions of CO, NOX, PM10, and PM2.5.

As the proposed Project’s emissions will comply with federal, state, and local air quality standards, the proposed Project’s emissions are not sufficiently high enough to use a regional modeling program to correlate health effects on a basin-wide level and would not provide a reliable indicator of health effects if modeled.

Mitigation Measure
The Modified Project introduces the following Mitigation Measures and are further described in detail Section 4.3.10.
• MM AQ-1
Impact AQ-4: Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

As discussed in the AQIA, the Modified Project has the potential to generate objectionable odors from construction and operation related activities. Potential odor sources associated with construction related activities from the Modified Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities. However, standard construction requirements would minimize odor related impacts from construction activities and equipment. Furthermore, the construction odor emissions would be temporary, short-term, and intermittent in nature and would cease upon completion of the respective phase of construction. Therefore, construction odor related impacts are considered to be less than significant.

Land use operations that are generally associated with objectional odor complaints include:
• Agricultural uses (livestock and farming)
• Wastewater treatment plants
• Food processing plants
• Chemical plants
• Composting operations
• Refineries
• Landfills
• Dairies
• Fiberglass molding facilities

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-28
As stated in the AQIA, potential odor related sources during operation of the Modified Project would primarily occur from development of Phase 2 which includes the super convenience gas station (with 12 vehicle fueling stations). Additionally, the refuse that would be stored in covered containers and removed at regular intervals in compliance with the solid waste regulations would be a potential odor related source. Pursuant to SCAQMD Rule 461 the proposed gas station land use would be required to utilize gas dispensing equipment that minimizes vapor and liquid leaks. Furthermore Rule 461 requires the equipment be maintained at proposed worker odor, which will minimize odor impacts occurring from the gasoline and diesel dispensing facilities. With required compliance of SCAQMD Rule 402 and Rule 461, odors associated with the Modified Project construction and operations would be less than significant and no mitigation is required. The 2001 determined the Approved Project would result in less than significant and no mitigation was required. Therefore, no new or substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR for the Approved Project.

Mitigation Measure
No mitigation measures are required.

4.3.8 CUMULATIVE IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
As stated within the AQIA, individual project-related construction and operational emissions that exceed SCAQMD thresholds for project-specific impacts would be considered cumulatively considerable. Due to the Modified Project’s construction-source air pollutant emissions not resulting in exceedances of regional thresholds with implementation of mitigation, cumulative impacts are considered to be less than significant. Alternatively, the Modified Projects operational‐source NOX emissions would exceed applicable SCAQMD regional thresholds. Per SCAQMD significance guidance, these impacts at the Project level are considered cumulatively significant and would persist over the life of the Project. The 2001 EIR determined the Approved Project would result in cumulatively considerable construction impacts from emission of NOx that would contribute to regional ozone formation. The 2001 EIR determined both long-term stationary (on-site energy consumption) and mobile (vehicular traffic) sources would contribute to regional criteria pollutant emissions, resulting in a cumulatively considerable impact. Therefore, no new or substantially greater cumulative impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR for the Approved Project.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-29

4.3.9 MITIGATION MEASURES IDENTIFIED IN PRIOR EIR APPLICABLE TO

MODIFIED PROJECT
The following 2001 EIR mitigation measures reduce air pollutants generated during the Project construction phase.

4.3.1A: The Construction Contractor shall select the construction equipment used on site based on low emission factors and high energy efficiency. The Construction Contractor shall ensure that construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications.

4.3.1B: The Construction Contractor shall utilize electric or diesel-powered equipment in lieu of gasoline-powered engines where feasible.

4.3.1C: The Construction Contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use.

During smog season (May through October), the overall length of the construction period should be extended, thereby decreasing the size of the area prepared each day, to minimize vehicles and equipment operating at the same time.

4.3.1D: The Construction Contractor shall time the construction activities so as to not interfere with peak hour traffic and minimize obstruction of through traffic lanes adjacent to the site; if necessary, a flag person shall be retained to maintain safety adjacent to existing roadways.

4.3.1E: The Construction Contractor shall support and encourage ridesharing and transit incentives for the construction crew.

4.3.1F: Dust generated by the development activities shall be retained on site and kept to a minimum by following the dust control measures listed below:
a. During clearing, grading, earth moving, excavation, or transportation of cut or fill materials, water trucks or sprinkler systems shall be used to prevent dust from leaving the site and to create a crust after each day's activities cease.
b. During construction, water trucks or sprinkler systems shall be used to keep all areas of vehicle movement damp enough to prevent dust from leaving the site. At a minimum, this would include wetting down such areas in the later morning and after work is completed for the day, and whenever wind exceeds 15 miles per hour.
c. After clearing, grading, earth moving, or excavation is completed, the entire area of disturbed soil shall be treated immediately by pickup of the soil until

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-30
the area is paved or otherwise developed so that dust generation will not occur.
d. Soil stockpiled for more than two days shall be covered, kept moist, or treated with soil binders to prevent dust generation.
e. Trucks transporting soil, sand, cut or fill materials and/or construction debris to or from the site shall be tarped from the point of origin.

4.3.1G: The Construction Contractor shall utilize as much as possible precoated/natural colored building materials, water-based or low-VOC coating, and coating transfer or spray equipment with high transfer efficiency, such as high volume low pressure (HVLP) spray method, or manual coatings application such as paint brush, hand roller, trowel, spatula, dauber, rag, or sponge.

4.3.2A: The project shall comply with Title 24 of the California Code of Regulations established by the Energy Commission regarding energy conservation standards. The project applicant shall incorporate the following in building plans:
• Planting trees to provide shade and shadow to building. • Solar or low-emission water heaters shall be used with combined space/water heater unit.
• Refrigerator with vacuum power insulation.
• Double-pained glass or window treatment for energy conservation shall be used in all exterior windows.
• Energy-efficient low-sodium parking lot lights shall be used.

4.3.2B: Use of transportation demand measures (TDM) such as preferential parking for vanpooling/carpooling, subsidy for transit pass or vanpooling/carpooling, flextime work schedule, bike racks, lockers, showers, and on-site cafeteria shall be incorporated in the design of the commercial land uses.

4.3.2C: The project proponent shall determine with the City and the electrical purveyor if it is feasible to pre-wire houses for electrical charges for EV cars and/or opticfibers for home offices. If feasible, install EV charges and/or optic-fibers per the electrical purveyor's direction prior to Certificate of Occupancy.

4.3.10 NEW MITIGATION MEASURES APPLICABLE TO MODIFIED PROJECT The Modified Project introduces the following Mitigation Measures and are further described in detail below. No feasible mitigation measures beyond MM AQ-2 through MM AQ-5 exist that would reduce project-related operational emissions to levels that are less than significant.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

AIR QUALITY

ENPLANNERS

4.3-31
MM AQ-1: During grading of Planning Areas 1, 2, and 3, all Construction Contractors shall ensure that offroad diesel construction equipment complies with Environmental Protection Agency (EPA)/CARB Tier 4 Interim emissions standards or equivalent and shall ensure that all construction equipment is tuned and maintained in accordance with the manufacturer’s specifications.

MM AQ-2: Legible, durable, weather-proof signs shall be placed at truck access gates, loading docks, and truck parking areas that identify applicable CARB antiidling regulations. At a minimum, each sign shall include: 1) instructions for truck drivers to shut off engines when not in use; 2) instructions for drivers of diesel trucks to restrict idling to no more than five (5) minutes once the vehicle is stopped, the transmission is set to "neutral" or "park," and the parking brake is engaged; and 3) telephone numbers of the building facilities manager and the CARB to report violations. Prior to the issuance of a certificate of occupancy, the Lead Agency (City of Corona) shall conduct a site inspection to ensure that the signs are in place.

MM AQ-3: Prior to tenant occupancy for Planning Areas 1, 2 and 3, the Project Applicants or successors in interest shall provide documentation to the Lead Agency (City of Corona) demonstrating that occupants/tenants of the Project site have been provided documentation on funding opportunities, such as the Carl Moyer Program, that provide incentives for using cleaner-than-required engines and equipment.

MM AQ-4: The minimum number of automobile electric vehicle (EV) charging stations required by the California Code of Regulations (CCR) Title 24 shall be provided. Final designs of Project buildings shall include electrical infrastructure sufficiently sized to accommodate the potential installation of additional auto and truck EV charging stations.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

AIR QUALITY

ENPLANNERS

4.3-32
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-1

4.4 BIOLOGICAL RESOURCES

4.4.1 INTRODUCTION
This section of the Draft SEIR assesses the potential impacts associated with biological resources from the implementation of the Proposed Project. The impact discussions for each specific impact topic include a comparison to the impacts evaluated for the Approved Project consistent with the conditions detailed in CEQA Guidelines 15162 regarding a Subsequent EIR. The discussion describes the regulatory framework and existing conditions, identifies criteria used to determine impact significance, provides an analysis of the potential impacts associated with biological resources, and identifies methods to mitigate any potentially significant impacts of the Proposed Project.

This section of the Draft SEIR is based on the Biological Technical Report for the Green River Specific Plan, prepared by Glenn Lukos Associates, Inc. dated April 2, 2024 (Appendix E-1); Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis for impacts to MSHCP Riparian/Riverine Area Green River Ranch Industrial Project, prepared by Glenn Lukos Associates, Inc. dated August 29, 2024 (Appendix E-2); and Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis, prepared by Glenn Lukos Associates, Inc. dated August 29, 2024 (Appendix E-3).

4.4.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The 2001 EIR determined the Approved Project would result in less than significant impacts to: wildlife movement and wildlife corridors; conflicts with any local policies or ordinances protecting biological resources; and conflicts with adopted conservation plan. Impacts to:
migratory birds (MM 4.7.3A and 4.7.3B); federal waters and state streambed and riparian habitat (4.7.2A); and natural communities (MM 4.7.4A and 4.7.4B) were determined to be less than significant with implementation of mitigation. Impacts to endangered species and removal of associated habitat were determined to be significant and unavoidable even with implementation of all feasible mitigation (MM 4.7.1A). The Biological impact analysis related to biological resources is summarized below based on the checklist questions in place at that time.
a) Have a substantial adverse effect, either directly or indirectly or through habitat modification, on any species listed as threatened or endangered under the California or the federal endangered species act or on any species that can be shown to meet the criteria for such listing?
and;

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-2
f) Conflict with the provisions of an adopted habitat conservation plan, natural community conservation plan, or other approved local, regional, or state habitat conservation plan.

Sensitive Species
The 2001 EIR found implementation of the Approved Project could result in short-term impacts during construction from the loss of individual sensitive species members and loss of habitat. The species identified onsite were the San Diego horned lizard, golden eagle, sharpshinned hawk, Cooper’s hawk, loggerhead shrike, and southern California rufous-crowned sparrow. Several other sensitive wildlife species were found to have a moderate potential to occur on site but these species were not seen on site. Because these species were not protected by federal or state listings as threatened or endangered and any loss of individuals would not threaten their regional populations, removal of their habitat was determined to be a less than significant impact.

Listed Species
The 2001 EIR found implementation of the Approved Project could result in the take of an endangered species in the form of direct loss (i.e., complete or partial removal) of at least one California gnatcatcher individual and approximately 8 acres of habitat used by the species.

Such take could result from harassment and harm to the species from being displaced and habitat being graded during lawful grading and construction of the Approved Project. The Approved Project was also found to result in the loss of critical habitat as identified by the USFWS for the California gnatcatcher.

These affects were considered to be a significant impact requiring mitigation. To mitigate such affects, the 2001 EIR required implementation of Mitigation Measure MM 4.7.1A that would replace destroyed California gnatcatcher habitat of equal or greater quality at a minimum ratio of 1:1. The Approved Project would impact 8 acres of California gnatcatcher habitat, and therefore MM 4.7.1A required acquisition and preservation of at least 8 acres of habitat in a location that would facilitate management for the species (i.e., supports the species and contiguous with a larger area managed for conservation of the species).

It should be noted the 2001 EIR determined the Approved Project would also remove many common plants, however these are abundant elsewhere and expected to recover. Thus, impacts were determined to be less than significant.
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the CDFG or the USFWS.
and;

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-3
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.

The 2001 EIR stated development of the Approved Project would result in the direct removal of individual Coast Live Oaks and reduction in approximately 3.90 acres of Coast Live Oak Woodland Communities. Consequently, the 2001 EIR determined impacts to individual oak trees and the reduction of overall Coast Live Oak Woodland Communities would be significant. To minimize such impacts, the 2001 EIR implemented Mitigation Measures MM

4.7.4A thru 4.7.4E of which required the Approved Project to prioritize clustering development and create an oak management plan that includes ongoing maintenance, access limitations, and transplanting opportunities. Additionally, the Approved Project would replant oak trees at a 10:1 ratio to compensate for any lost trees. As such, the 2001 EIR determined impacts to coast live oak woodlands would be reduced to a less than significant level with implementation of Mitigation Measures MM 4.7.4A thru 4.7.4E.
c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means.

The 2001 EIR determined development of the Approved Project would result in the loss of Army Corps of Engineers (Corps) defined jurisdictional waters and California Department of Fish and Game (CDFG) defined jurisdictional streambed and related riparian habitat; therefore, impacts were considered significant due to the cumulative linear distance of stream impact and the complete filling of direct tributaries to the Santa Ana River. CDFG changed its name after certification of the 2001 EIR and is now known as the California Department of Fish and Wildlife (CDFW). CDFW will be referenced from this point forward.

The 2001 EIR stated implementation of the Approved Project would result in the loss of 1.76 acres of Corps jurisdictional waters and 9.81 acres of CDFW jurisdictional streambed and associated riparian habitat and approximately 15,350 linear feet of ephemeral streambed within the GRRSP area. The Approved Project would fill all of the on-site streambeds in the form of manufactured slopes. As previously stated, these impacts in the 2001 EIR were determined significant requiring implementation of Mitigation Measure 4.7.2A. MM 4.7.2A would replace any riparian habitat lost due to the Approved Project. Additionally, MM 4.7.2A required the Approved Project to either create new habitat on-site at a 1.5:1 ratio (e.g., creating

1.5 acres for every 1 acre lost) or purchase credits at a 2:1 ratio from an off-site mitigation bank. The created habitat must be permanent and any oak woodlands established for other mitigation measures can also count towards this goal if placed in riparian areas. Finally, MM

4.7.2A stated the Approved Project would likely need permits from wildlife and water quality agencies due to the impact on riparian habitat.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-4
In conclusion, the 2001 EIR determined impacts to jurisdictional waters were reduced to a less than significant level with implementation of Mitigation Measure MM 4.7.2A, and additional mitigation measures may be imposed by the Corps, CDFW, and Regional Water Quality Control Board (RWQCB) during their respective permitting/approval processes. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native or resident migratory wildlife corridors, or substantially diminish wildlife habitat.

Migratory Wildlife
The 2001 EIR determined development of the Approved Project would disturb or destroy active migratory bird nests, a violation of the Migratory Bird Treaty Act, therefore, creating a potentially significant impact.

Although no nests were observed, the 2001 EIR determined the Approved GRRSP area supports a variety of tall trees (native and non-native) that could potentially support nesting birds, particularly raptors. Consequently, disturbing or destroying active nests is a violation of the Migratory Bird Treaty Act and was determined to be a significant adverse impact.

The 2001 EIR required the implementation of Mitigation Measures MM 4.7.3A and MM

4.7.3.B (Alternative) to protect nesting birds during construction of the Approved Project. This mitigation required the Approved Project to either conduct pre-construction surveys to identify and avoid active nests during nesting season (March-July), or simply delay tree removal and grading activities until after the nesting season is over. The 2001 EIR determined impacts to migratory bird nesting were reduced to a less than significant level with implementation of either Mitigation Measure MM 4.7.3A or 4.7.3B (Alternative).

Wildlife Corridor
The 2001 EIR determined the GRRSP area would not likely be used as a regional wildlife movement corridor and impacts to the site as a result of the Approved Project would not significantly impact regional wildlife movement. Biologists concluded that the GRRSP area was unlikely to be a corridor as the northern portion of the property itself is developed and lacks vegetation, and the surrounding freeways, railroads, and residential and commercial development block wildlife movement. The 2001 EIR concluded the larger undisturbed Coal Canyon with year-round water and diverse habitats is a more suitable path for wildlife traveling between the Santa Ana Mountains and Chino Hills open spaces. The 2001 EIR determined impacts to be less than significant.

Cumulative Impacts
The 2001 EIR stated that as many as 25 sensitive wildlife species, including the California gnatcatcher, (discussed above) could be reasonably expected or demonstrated to occur on the Approved Project site in a resident, seasonal, migratory or transient basis, utilizing coastal sage

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-5
scrub, chaparral, oak woodland, and grassland habitats. The 2001 EIR found that the project would have some impact on sensitive habitats and streambeds, and while the impact on individual species might be small, the overall effect on these resources would be significant.

Furthermore, the 2001 EIR stated the regional loss and fragmentation of coastal sage scrub habitat led to the 1993 listing of the California gnatcatcher as a Threatened species under the federal ESA. The 2001 EIR concluded that the Approved Project would significantly reduce habitat for various sensitive coastal plant and animal species, with efforts to mitigate the impact on the California gnatcatcher, the overall effect on such resources would remain significant and unavoidable even with implementation of mitigation.

4.4.3 ENVIRONMENTAL SETTING
The Modified Project site is located within the western portion of the City and consist of approximately 175 acres of various vegetation communities. Due to the topography of the property, development has historically been limited to the northern portion of the site. The property slopes to the north toward Green River Road. The southern portion of the site is dominated by the rugged hillside terrain of the Santa Ana Mountains. Northerly trending ridges with intervening northerly drainage tributary canyons flow from the high terrain. As these canyons descend to the north into the Study Area, the canyons transition to narrow streambeds that ultimately discharge to series of pipes and culverts on the south side of Green River Road. The central portion of the site contains several low foothills and deeply incised drainages, while the northern portion of the property is characterized by gently sloping to flat terrain. Elevations within the Project site range from approximately 525 feet above mean sea level (MSL) at Green River Road to over 2,500 feet above MSL in the southcentral portions.

The Modified Project area is located south of SR 91, southwest of Dominguez Ranch Road, and southeast of Fresno Road. Green River Road bisects a small portion of the GRRSP Planning Area in an east-west alignment. The Modified Project site is bounded by undeveloped land on the north, partially developed land to the east, the 91 Freeway to the west, and undeveloped land to the south. Further to the south, is the Cleveland National Forest. The Open Space and Estate Residential portions of the Project are located within the foothills of the Santa Ana Mountains. The BPI portion of the Modified Project is located at the base of these foothills.

Plant Community/Habitat Classification
Vegetation is similar to that outlined within the 2001 EIR. The Study Area supports the following MSHCP vegetation and land-cover types: Riparian Scrub, Woodland, Forest/Riverine Vegetation, Coastal Sage Scrub, Chaparral, Desert, Developed/Disturbed Land, and Grassland. Within the Riparian Scrub, Woodland, Forest/Riverine Vegetation classification, there are two different vegetation alliances: Coast Live Oak Woodland and Elderberry Stands. For the Coastal Sage Scrub classification, the following alliances are

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-6
present: Coastal Sage Scrub and Riversidean Sage Scrub/Mixed Chaparral. In the Chaparral classification there are four alliances: Disturbed Mixed Chaparral, Lower Montane Mixed Chaparral, Mixed Chaparral, Southern Mixed Chaparral. In the Desert classification there is one alliance: Saltbush Scrub. The Grassland classification is vegetated by Non-native Grassland. The description of the natural communities is provided below and on Table 4.4-1 and in Figure 4.4.1.

Table 4.4-1: Natural Communities within the Project site and Offsite Improvements Natural Community Onsite Project Site
(Acres)
Offsite
Improvements
(Acres)
Scrub Communities
Coastal Sage Scrub 1.27 1.15
Saltbush Scrub 0.25 0.76
Chaparral Communities
Riversidean Sage Scrub/Mixed Chaparral 1.90 0.00
Mixed Chaparral 41.69 0.00
Disturbed Mixed Chaparral 15.59 0.03
Southern Mixed Chaparral 3.45 0.00
Lower Montane Mixed Chaparral 0.94 0.00
Grassland Communities
Ruderal/Non-Native Grassland 69.37 1.64
Woodland Communities
Elderberry Savannah 0.55 0.26
Coast Live Oak Woodland 4.74 0.00
Disturbed or Developed Areas
Disturbed/Developed 18.29 10.94
Residential/Urban/Exotic 1.78 0.52
Total 159.82 15.30
PAGE: 4.4-7
FIGURE 4.4-1: PROJECT VEGETATION MAP
SOURCE: GLENN LUKOS ASSOCIATES, 2024.

LEGEND
Specific Plan Boundary (Onsite)
Offsite Improvements
Coast Live Oak Woodland
Coastal Sage Scrub
Disturbed Mixed Chaparral
Disturbed/Developed
Elderberry Savannah
Lower Montane Mixed Chaparral
Mixed Chaparral
Residential/Urban/Exotic
Riversidean Sage Scrub/Mixed Chaparral
Ruderal/Non-native grassland
Saltbush Scrub
Southern Mixed Chaparral

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-8
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-9
Coastal Sage Scrub
The Study Area supports approximately 2.42 acres of coastal sage scrub within the southwestern Project boundary and north of Green River Road, of which 1.27 acres are within the Specific Plan (onsite) and 1.15 acres are located in the offsite improvement areas. This plant community is dominated with California sagebrush (Artemisia californica), California brittlebush (Encelia californica), California buckwheat (Eriogonum fasciculatum), occasional individuals or small patches of deerweed (Acmispon glaber), and non-native grasses in the understory.

Saltbush Scrub
The Study Area supports approximately 1.01 acres of Southern Saltbush Scrub, of which 0.25 acre is within the Specific Plan (onsite) and 0.76 acre is located in the offsite improvement areas. This plant community occurs primarily on along the shoulders of Green River Road.

This plant community is dominated by big saltbush (Atriplex lentiformis), with laurel sumac, California buckwheat, California sagebrush, California brittlebush, and coyote bush (Baccharis pilularis).

Riversidean Sage Scrub/Mixed Chaparral
The Study Area contains 1.90 acres of Riversidean Sage Scrub/Mixed Chaparral, all of which is in the Specific Plan (onsite). This plant community occurs primarily within the southern portions of the Study Area. This plant community is dominated primarily with deerweed (Acmispon glaber), black sage (Salvia mellifera), and California sagebrush.

Mixed Chaparral
The Study Area supports approximately 41.69 acres of Mixed Chaparral, all of which is in the Specific Plan (onsite). This plant community occurs primarily on the southern portion of the Study Area. This plant community is dominated by laurel sumac, California sagebrush, California buckwheat, and chaparral yuca.Disturbed Mixed Chaparral The Study Area supports approximately 15.62 acres of Disturbed Mixed Chaparral, of which

15.59 acres are within the Specific Plan (onsite) and 0.03 acre is located in the offsite improvement areas. This plant community occurs primarily within the southwestern Project boundary. This plant community is dominated by laurel sumac (Malosma laurina), lemonade berry (Rhus integrifolia), California sagebrush, California buckwheat, and chaparral yucca (Hesperoyucca whipplei).

Southern Mixed Chaparral
The Study Area supports approximately 3.45 acres of Southern Mixed Chaparral, all of which is in the Specific Plan (onsite). This plant community occurs primarily on the southern portion of the Study Area. This plant community is dominated by lemonade berry, chamise

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-10
(Adenostoma fasciculatum), California sagebrush, California buckwheat, laurel sumac, California buckwheat, and chaparral yucca.

Lower Montane Mixed Chaparral
The Study Area supports approximately 0.94 acre of Lower Montane Mixed Chaparral, all of which is in the Specific Plan (onsite). This plant community occur primarily within the western portion of the Study Area south of Fresno Road. This plant community is dominated by toyon (Heteromeles arbutifolia) in the shrub layer along with black sage (Salvia mellifera), and California sagebrush. The understory is sparsely vegetated.

Ruderal/Non-Native Grassland
The Study Area supports approximately 71.01 acres of Ruderal/Non-Native Grassland, of which 69.37 acres are within the Specific Plan (onsite) and 1.64 acres are located in the offsite improvement areas. This plant community is present throughout the Study Area. As such, this plant community is dominated by non-native ruderal species including red brome (Bromus madritensis ssp. rubens), Russian thistle (Salsola tragus), foxtail barley (Hordeum murinum), Mediterranean grass (Schismus barbatus), black mustard (Brassica nigra), tocalote (Centaurea melitensis), and coastal heron’s bill (Erodium cicutarium).

Elderberry Savannah
The Study Area supports approximately 0.81 acre of Elderberry Savannah, of which 0.55 acre is within the Specific Plan (onsite) and 0.26 acre is located in the offsite improvement areas.

This plant community occurs within the northern portions of the Study Area just north of Green River Road in the offsite Commercial Development. This plant community is dominated with blue elderberry (Sambucus nigra ssp. caerulea) with a non-native grasses in the understory.

Coast Live Oak Woodland
The Study Area supports approximately 4.74 acres of coast live oak woodland near the southern and eastern Project boundary, all of which is in the Specific Plan (onsite). This plant community is dominated with coast live oak (Quercus agrifolia) with non-native grasses in the understory. This plant community is riparian vegetation associated with drainage features.

Disturbed/Developed
The Study Area supports approximately 29.23 acres of disturbed/developed lands, of which

18.29 acres are within the Specific Plan (onsite) and 10.94 acres are located in the offsite improvement areas. This land-cover type occurs primarily within the northern portions of the Study Area. Developed areas are areas where human disturbance has resulted in permanent modification of the existing landscape. These include paved areas, equestrian uses, Green River Road, and buildings. As such, this land cover type does not represent a natural plant community.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-11
Residential/Urban/Exotic
The Study Area contains 2.30 acres of Residential/Urban/Exotic vegetation, of which 1.78 acres are within the Specific Plan (onsite) and 0.52 acre is located in the offsite improvement areas. Residential/Urban/Exotic vegetation includes areas where the vegetation predominately consists of introduced or escaped non-native horticultural plants, including trees, shrubs, flowers, and turf grass. This plant community occurs primarily along Green River Road, the eastbound SR-91 onramp, and along Dominguez Ranch Road. This plant community include eucalyptus (Eucalyptus sp.), Peruvian pepper tree (Schinus molle), and fountain grass (Pennisetum setaceum).

Sensitive Plant Surveys
Similar to the 2001 EIR, sensitive plant surveys were conducted concurrently with other survey efforts for the Modified Project and in accordance with published survey guidelines. Sensitive plant species include those listed as threatened or endangered or candidates for listing by USFWS, CDFW, and listed by CNPS as extinct, rare, threatened, or endangered (CNPS list 1A, 1B, and 2). Because the Project lies within the potential Quino checkerspot butterfly (QCB) range, exhaustive survey efforts were undertaken to identify any potential host plant species for the QCB. The level of detail necessary to identify those host plants also led to a thorough survey for all sensitive plant species potentially occurring on the subject property.

Plant surveys were focused within all habitat communities on site. All plant species observed were recorded in field notes.

Several sensitive plant species were reported in the Biological Technical Report (Appendix D1) as potentially existing in the region. Table 4-3 in Appendix D-1 provides a complete list of sensitive plant species and likelihood of presence/absence within the Study Area. However, none of the sensitive plant species were observed on the within the development footprint.

Coast live oaks woodland occurs on site (4.74 acres) in the easterly and the centrally located drainages of the property.

Waters of the U.S. and Wetlands
A jurisdictional wetlands and waters of the U.S. assessment of the Project site was conducted according to the methods outlined in the Corps Wetland Delineation Manual (1987). Nonwetland waters of the U.S. were delineated based on the limits of the an ordinary high water mark (OHWM) as determined by erosion, the deposition of vegetation or debris, and changes in vegetation. The CDFW jurisdiction was defined to the bank of the stream/channels or to the limit of the adjacent riparian vegetation.

Jurisdictional features addressed within the Study Area include three major drainage systems, referred to herein as Drainage Systems A, B, and C. Each of these systems includes several small tributaries that feed into the larger drainages and are sometimes connected to the system

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-12
by non-jurisdictional swale-like features that do not possess an OHWM or obvious bed, bank, or channel. There is also a small drainage feature located north of Green River Road that is referred to herein as Drainage D. Drainage C contained a pocket of riparian vegetation in an upper reach. The vegetation consists of mature coast live oak, arroyo willow (Salix lasiolepis), red willow (Salix laevigata), Fremont cottonwood (Populus fremontii), and black cottonwood (Populus balsamifera).

All drainages are identified as being ephemeral.

Identified within the three major drainage systems and their respective tributaries, the RWQCB jurisdiction totals 18,838 linear feet, of which 467 linear feet occurs offsite. The total acreage of RWQCB jurisdiction is 3.03 acres, of which 0.06 acres occurs offsite. No Corps jurisdiction was identified. The existing Corps and RWQCB jurisdictional drainages are shown on Figure

4.4-2.

Identified within the three major drainage system and their respective tributaries, total CDFW jurisdiction is 8,838 linear feet, of which 467 linear feet occurs offsite. The total acreage of CDFW jurisdiction is 8.30 acres, of which 0.10 acres occurs offsite. Of the 8.30 acres of CDFW jurisdiction, a total of 4.66 acres is identified as riparian habitat. The existing CDFW jurisdictional drainages are shown on Figure 4.4-3.

Identified within the three major drainage system and their respective tributaries, total Riparian/Riverine MSHCP jurisdiction is 8.30 acres, of which 0.10 acres occurs offsite. Of the

8.30 acres, 3.64 acres is considered MSHCP Riverine habitat, and 4.66 acres is considered MSHCP Riparian habitat. The existing Riparian/Riverine jurisdictional drainages are shown on Figure 4.4-4.

General Wildlife Inventory
General wildlife surveys were conducted concurrent with all site investigations. Animals identified during the diurnal field surveys by sight, call, tracks, nests, scat, remains, or other signs were recorded. In addition to species observed on the property, species expected to use the site were derived from analysis of habitats on the site and known preferences of regionally occurring wildlife species were listed as potentially present on the property.

The property is located along the southern edge of a significant natural area, which surrounds the Santa Ana River in the western most edge of Riverside County. The area is labeled as site number RIV 14 by the CDFW (Significant Natural Areas of Riverside County, 1999).

Wildlife species common to the region and habitat types occurring on site are expected or observed to be present on site. Special status species observed during the Biological and focused surveys include least Bell’s vireo, Crotch’s bumble bee, yellow warbler, and Southern California rufous-crowned sparrow.

FIGURE 4.4-2: RWQCB JURISDICTIONAL DRAINAGES
PAGE: 4.4-13
LEGEND
SOURCE: GLENN LUKOS ASSOCIATES, 2024.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-14
This Page Intentionally Left Blank
FIGURE 4.4-3: CDFW JURISDICTIONAL DRAINAGES
SOURCE: GLENN LUKOS ASSOCIATES, 2024. PAGE: 4.4-15
LEGEND

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-16
This Page Intentionally Left Blank
PAGE: 4.4-17
FIGURE 4.4-4: MSHCP JURISDICTIONAL DRAINAGES
SOURCE: GLENN LUKOS ASSOCIATES, 2024.

LEGEND

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-18
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-19
Wildlife species observed as well as those expected to occur within the study area are summarized in Appendix B of the Biological Resources Assessment (Appendix E-1 to this Supplemental EIR).

Regional Connectivity / Wildlife Movement Corridor Assessment The Project site and adjacent lands support the movement of multiple mammalian species, including mountain lion, mule deer, bobcat, coyote, and grey fox, utilizing an extension system of ridges, canyons, and trails. The Project site occurs within an area that the MSHCP identifies as Proposed Constrained Linkage 1 (PCL-1). PCL-1 is intended to connect Existing Core A (north of the Project site) with Existing Core B to the south and is expected to provide for movement of mountain lion, bobcat, and other wildlife. However, the northern portion of PCL1 contains multiple constraints to wildlife movement, including SR-91, the Burlington Northern Santa Fe (BNSF) railroad line, and Green River Road. Because of these constraints and the presence of an important wildlife movement area to the west (referred to as “B Canyon”), the RCA, Wildlife Agencies, and the City of Corona have for a number of years discussed the possibility of relocating PCL-1 to the west to coincide with the B Canyon area.

However, because the B Canyon lands have until recently been privately owned, it was not possible to accomplish a Criteria Refinement necessary to formally re-designate the Linkage, referred to within this document as the Alternative Alignment of PCL-1. Recently the RCA completed the acquisition of approximately 740 acres of lands located south and west of the Specific Plan Project that coincide with B Canyon. Concurrent with the land acquisition, GLA submitted a Criteria Refinement Analysis via the City of Corona to the RCA to support the formal relocation of PCL-1. The RCA issued Criteria Refinement Review Findings (CR# 24- 01-10-01, dated February 20, 2024) in support of the Criteria Refinement and those (Appendix D-4).

RCA and Wildlife Agencies have conceptually approved the Refinement Criteria and Alternative Alignment of PCL-1 (Appendix D-4). Additional information and environmental analysis of the Alternative Alignment of PCL-1 can be found in Section 5.0.

In further support of the assembly of PCL-1, the Project conserves 80.77 acres of land within the southern half of the Project site. The proposed conservation is contiguous with the lands recently acquired by the RCA for the MSHCP Reserve. The 80.77 acres of proposed conservation contains the structural topography and vegetative cover to facilitate regional wildlife movement. It also aligns with the wildlife linkage/corridor conservation goals of the MSHCP.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-20

4.4.4 EXISTING REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL
Federal Endangered Species Act
The Federal Endangered Species Act (FESA) of 1973 defines an endangered species as “any species that is in danger of extinction throughout all or a significant portion of its range.” A threatened species is defined as “any species that is likely to become an endangered species within the foreseeable future throughout all or a significant portion of its range.” Under provisions of Section 9(a)(1)(B) of the FESA it is unlawful to “take” any listed species. “Take” is defined in Section 3(18) of FESA: “...harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct.” Further, the USFWS, through regulation, has interpreted the terms “harm” and “harass” to include certain types of habitat modification that result in injury to, or death of species as forms of “take.” These interpretations, however, are generally considered and applied on a case-by-case basis and often vary from species to species. In a case where a property owner seeks permission from a federal agency for an action that could affect a federally listed plant and animal species, the property owner and agency are required to consult with USFWS. Section 9(a)(2)(b) of the FESA addresses the protections afforded to listed plants.

Section 7 of the ESA outlines the procedures for Federal interagency cooperation to conserve Federally listed species and designated critical habitat. Section 7 of the Act requires federal agencies to consult with the USFWS on proposed actions which may affect threatened or endangered species or which may affect critical habitat. Section 7 also requires federal agencies to confer with the USFWS if the agency determines that its action is likely to jeopardize the continued existence of any proposed species or result in the destruction or adverse modification of proposed critical habitat. This consultation may take place in two steps:

1. Informal consultation is an optional process that includes all discussions, correspondence, etc. between the USFWS and the federal agency or a designated non-federal representative. Informal consultation is designed to assist the involved agencies in determining whether an action may affect a listed species. If the USFWS concurs that an action is not likely to adversely affect a listed species, Section 7 consultation ends. During informal consultation, the USFWS may suggest modifications to the action that the federal agency and/or permittee could make to avoid the likelihood of adverse effect.

2. If the project is likely to adversely affect a listed species, formal consultation between the USFWS and the federal agency is initiated. During formal consultation, the USFWS evaluates information relating to potential project effects on the listed species. At the conclusion of this evaluation, the USFWS formulates

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-21
a Biological Opinion as to whether the project is likely to jeopardize the continued existence of the listed species. If a "jeopardy opinion" is issued, the USFWS is to include reasonable and prudent alternatives to the federal action. In the case of a "no jeopardy opinion" (or with the implementation of reasonable and prudent alternatives), the USFWS may also issue an "incidental take" statement, which allows the incidental take of a listed species in accordance with terms and conditions specified in the Biological Opinion.

Section 10 of the ESA provides the regulatory mechanism which allows the incidental take of a listed species by private interests and non-federal government agencies during lawful land, water, and ocean use activities. Under these conditions habitat conservation plans (HCPs) for the impacted species must be developed, approved by the USFWS, and implemented by the permittee. It is the goal through the HCP to minimize impacts to the species and develop viable mitigation measures to offset the unavoidable impacts.

STATE
California Endangered Species Act
California’s Endangered Species Act (CESA) defines an endangered species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant which is in serious danger of becoming extinct throughout all, or a significant portion, of its range due to one or more causes, including loss of habitat, change in habitat, overexploitation, predation, competition, or disease.” The State defines a threatened species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that, although not presently threatened with extinction, is likely to become an endangered species in the foreseeable future in the absence of the special protection and management efforts required by this chapter. Any animal determined by the commission as rare on or before January 1, 1985 is a threatened species.” Candidate species are defined as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that the commission has formally noticed as being under review by the department for addition to either the list of endangered species or the list of threatened species, or a species for which the commission has published a notice of proposed regulation to add the species to either list.” Candidate species may be afforded temporary protection as though they were already listed as threatened or endangered at the discretion of the Fish and Game Commission. Unlike the Federal Endangered Species Act (FESA), CESA does not list invertebrate species.

Article 3, Sections 2080 through 2085, of the CESA addresses the taking of threatened, endangered, or candidate species by stating “No person shall import into this state, export out of 18 this state, or take, possess, purchase, or sell within this state, any species, or any part or product thereof, that the commission determines to be an endangered species or a threatened species, or attempt any of those acts, except as otherwise provided.” Under the CESA, “take”

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-22
is defined as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill.” Exceptions authorized by the state to allow “take” require permits or memoranda of understanding and can be authorized for endangered species, threatened species, or candidate species for scientific, educational, or management purposes and for take incidental to otherwise lawful activities. Sections 1901 and 1913 of the of the California Fish and Game Code provide that notification is required prior to disturbance.

State authorizations of impacts to or incidental take of a listed species by a private individual or other private entity would be granted as outlined within Sections 2090-2097 of the CESA.

This requires that the state lead agency consult with CDFW on projects with potential impacts on state-listed species. These provisions also require CDFW to coordinate consultations with USFWS for actions involving federally listed as 19 well as state-listed species. In certain circumstances, Section 2080.1 of the California Fish and Game Code allows CDFW to adopt the federal incidental take statement or the 10(a) permit as its own based on its findings that the federal permit adequately protects the species under state law.

Clean Water Act, Section 404
Pursuant to Section 404 of the Clean Water Act, the Corps regulates the discharge of dredged and/or fill material into waters of the United States. The term "waters of the United States" is defined in Corps regulations at 33 CFR Part 328.3(a) as:
(1) All waters which are currently used, or were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide;
(2) All interstate waters including interstate wetlands; (3) All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds, the use, degradation or destruction of which could affect foreign commerce including any such waters:
(i) Which are or could be used by interstate or foreign travelers for recreational or other purposes; or
(ii) From which fish or shell fish are or could be taken and sold in interstate or foreign commerce; or
(iii) Which are used or could be used for industrial purpose by industries in interstate commerce...
(4) All impoundments of waters otherwise defined as waters of the United States under the definition;
(5) Tributaries of waters identified in paragraphs (a) (1)-(4) of this section; (6) The territorial seas;
(7) Wetlands adjacent to waters (other than waters that are themselves wetlands) identified in paragraphs (a) (1)-(6) of this section.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-23
(8) Waters of the United States do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other federal agency, for the purposes of the Clean Water Act, the final authority regarding Clean Water Act jurisdiction remains with the EPA.

Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of CWA (other than cooling ponds as defined in 40 CFR 123.11(m) which also meet the criteria of this definition) are not waters of the United States.

In the absence of wetlands, the limits of Corps jurisdiction in non-tidal waters, such as intermittent streams, extend to the OHWM which is defined at 33 CFR 328.3(e) as: ...that line on the shore established by the fluctuation of water and indicated by physical characteristics such as clear, natural line impressed on the bank, shelving, changes in the character of soil, destruction of terrestrial vegetation, the presence of litter and debris, or other appropriate means that consider the characteristics of the surrounding areas.

The term “wetlands” (a subset of “waters of the United States”) is defined at 33 CFR 328.3(b) as "those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support...a prevalence of vegetation typically adapted for life in saturated soil conditions." In 1987 the Corps published the Wetland Manual to guide its field personnel in determining jurisdictional wetland boundaries. The methodology set forth in the Wetland Manual and the Arid West Supplement generally require that, in order to be considered a wetland, the vegetation, soils, and hydrology of an area exhibit at least minimal hydric characteristics. While the Wetland Manual and Arid West Supplement provide great detail in methodology and allow for varying special conditions, a wetland should normally meet each of the following three criteria:
• More than 50 percent of the dominant plant species at the site must be hydrophytic in nature as published in the most current national wetland plant list; • Soils must exhibit physical and/or chemical characteristics indicative of permanent or periodic saturation (e.g., a gleyed color, or mottles with a matrix of low chroma indicating a relatively consistent fluctuation between aerobic and anaerobic conditions); and
• Whereas the Wetland Manual requires that hydrologic characteristics indicate that the ground is saturated to within 12 inches of the surface for at least five percent of the growing season during a normal rainfall year, the Arid West Supplement does not include a quantitative criteria with the exception for areas with “problematic hydrophytic vegetation”, which require a minimum of 14 days of ponding to be considered a wetland.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-24
Clean Water Act, Section 401
The California Regional Water Quality Control Board (RWQCB) is responsible for the administration of Section 401 of the Clean Water Act. RWQCB and each of its nine Regional Boards regulate the discharge of waste (dredged or fill material) into waters of the United States and waters of the state. Waters of the United States are defined above in Section II.A and waters of the state are defined as “any surface water or groundwater, including saline waters, within the boundaries of the state” (California Water Code 13050[e]).

The Project is within the jurisdiction of the Santa Ana RWQCB and will require a water quality certification or waiver. Section 401 of the CWA requires certification for any federal permit or license authorizing impacts to waters of the U.S. (i.e., waters that are within federal jurisdiction), such as Section 404 of the CWA and Section 10 of the Safe Rivers and Harbors Act, to ensure that the impacts do not violate state water quality standards. When a project could impact waters outside of federal jurisdiction, the Regional Board has the authority under the Porter-Cologne Water Quality Control Act to issue Waste Discharge Requirements (WDRs) to ensure that impacts do not violate state water quality standards. Clean Water Act Section 401 Water Quality Certifications, WDRs, and waivers of WDRs are also referred to as orders or permits.

California Fish and Wildlife Section 1600
Sections 1600-1603 of the California Fish and Game Code, the California Department of Fish and Wildlife (CDFW) regulates all diversions, obstructions, or changes to the natural flow or bed, channel, or bank of any river, stream, or lake, which supports fish or wildlife.

CDFW defines a stream (including creeks and rivers) as "a body of water that flows at least periodically or intermittently through a bed or channel having banks and supports fish or other aquatic life. This includes watercourses having surface or subsurface flow that supports or has supported riparian vegetation." CDFW's definition of "lake" includes "natural lakes or manmade reservoirs." CDFW also defines a stream as “a body of water that flows, or has flowed, over a given course during the historic hydrologic regime, and where the width of its course can reasonably be identified by physical or biological indicators.” It is important to note that the Fish and Game Code defines fish and wildlife to include: all wild animals, birds, plants, fish, amphibians, invertebrates, reptiles, and related ecological communities including the habitat upon which they depend for continued viability (FGC Division 5, Chapter 1, section 45 and Division 2, Chapter 1 section 711.2(a) respectively).

Furthermore, Division 2, Chapter 5, Article 6, Section 1600 et seq. of the California Fish and Game Code does not limit jurisdiction to areas defined by specific flow events, seasonal changes in water flow, or presence/absence of vegetation types or communities.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-25

REGIONAL
Western Riverside Multiple Species Habitat Conservation Plan The Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) was adopted on June 17, 2003, and an Implementing Agreement (IA) was executed between the federal and state wildlife agencies and participating entities. The MSHCP is a comprehensive habitat conservation-planning program for western Riverside County. The intent of the MSHCP is to preserve native vegetation and meet the habitat needs of multiple species, rather than focusing preservation efforts on one species at a time. As such, the MSHCP is intended to streamline review of individual projects with respect to the species and habitats addressed in the MSHCP, and to provide for an overall Conservation Area that would be of greater benefit to biological resources than would result from a piecemeal regulatory approach. The MSHCP provides coverage (including take authorization for listed species) for special-status plant and animal species, as well as mitigation for impacts to sensitive species pursuant to Section 10(a) of the FESA.

Through agreements with the U.S. Fish and Wildlife Service (USFWS) and the California Department of Fish and Wildlife (CDFW), the MSHCP designates 146 special-status animal and plant species that receive some level of coverage under the plan. Of the 146 “Covered Species” designated under the MSHCP, the majority of these species have no additional survey/conservation requirements. In addition, through project participation with the MSHCP, the MSHCP provides mitigation for project-specific impacts to Covered Species so that the impacts would be reduced to below a level of significance pursuant to CEQA. As noted above, project-specific survey requirements exist for species designated as “Covered Species not yet adequately conserved”. These include Narrow Endemic Plant Species, as identified by the Narrow Endemic Plant Species Survey Areas (NEPSSA); Criteria Area Plant Species identified by the Criteria Area Species Survey Areas (CASSA); animal species as identified by survey area; and plant and animal species associated with riparian/riverine areas and vernal pool habitats (Volume I, Section 6.1.2 of the MSHCP document).

For projects that have a federal nexus such as through federal Clean Water Act Section 404 permitting, take authorization for federally listed covered species would occur under Section 7 (not Section 10) of FESA and that USFWS would provide a MSHCP consistency review of the proposed project, resulting in a biological opinion. The biological opinion would require no more compensation than what is required to be consistent with the MSHCP.

LOCAL
City of Corona 2020–2040 General Plan
The City of Corona 2020–2040 General Plan includes several goals and policies relating to biological resources including:

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-26
Environmental Resources Element
Goal ER-4: Proper management of floodplain and riparian areas for their importance to wildlife habitat, unique and sensitive plant life, water recharge, and public health and safety.

Policy ER-4.4: Preserve and enhance existing native riparian habitat and prevent obstruction of natural watercourses to the extent feasible in new private and public developments or implement on-site replacement as mitigation.

Goal ER-5: Preservation and protection of natural and man-made wetlands from development impacts for their importance to wildlife habitat, unique and sensitive plant life, water recharge, and scenic value.

Policy ER-5.5: Prohibit the planting of invasive, nonnative species in areas that would encroach and affect watercourses, their banks, and riparian areas.

Goal ER-6: Protection, enhancement, and sustaining of significant plant and wildlife species and habitat that exist in Corona and its Planning Area, for the long-term benefit of the natural environment and Corona residents and visitors.

Policy ER-6.1: Support the rehabilitation and enhancement of the biological diversity, and integrity of the City’s natural resources through such means as vegetation restoration, control of alien plants and animals, landscape buffering, and natural watercourse channel restoration.

Policy ER-6.2: Preserve the wildlife and plant species and habitats listed in Tables 4- 12 and 4-13 of the Technical Background Report for the General Plan and EIR and those that may be considered by the City of Corona in the future.

Policy ER-6.3: Ensure that new developments and circulation improvements demonstrate compliance with state and federal regulations concerning the status, location, and condition of significant and sensitive biological species and habitats and riparian and riverine corridors. Biological surveys, as required and defined by the Western Riverside County Multiple Species Habitat Conservation Plan, should identify potential impacts on biological resources and include mitigation measures to protect/replace resources in like kind.

Policy ER-6.4: Ensure that new developments through the development review process adhere to the Western Riverside County Multiple Species Habitat Conservation Plan, the Stephens’ Kangaroo Rat Habitat Conservation Plan, and other habitat plans as appropriate to conserve biological diversity through protection of natural communities.

Policy ER-6.5: Preserve wildlife habitat of significant natural open space areas, including expanding habitat ranges, movement corridors, and nesting sites by adhering to and implementing the core biological linkages identified in the MSHCP for parts of the Temescal Canyon Area Plan in the City. Any proposed recreational use of those areas such as trails shall be designed to not interfere with the preservation efforts established in the MSHCP.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-27
Goal ER-7: Adequate protection of biological resources and increased public awareness of their value to the community.

Policy ER-7.1: Require that public and private construction activities be conducted in a manner to minimize adverse impacts on natural resources and biological resources in proximity to MSHCP conservation areas and adhere to the MSHCP Guidelines pertaining to Urban/Wildlife Interface for drainage, toxics, lighting, noise, invasive barriers and grading [MSHCP Section 6.1.4].

Goal ER-8: Protection, enhancement, and sustaining of significant plant and wildlife species and habitat that exist in Corona and its Planning Area, for the long-term benefit of the natural environment and Corona residents and visitors.

Policy ER-6.1: Support the rehabilitation and enhancement of the biological diversity, and integrity of the City’s natural resources through such means as vegetation restoration, control of alien plants and animals, landscape buffering, and natural watercourse channel restoration.

Goal ER-8: Protection of forest and vegetation resources in the City of Corona.

Policy ER-8.1: Cooperate with federal and state agencies to achieve the sustainable conservation of forest lands as a means of providing open space and protecting natural resources and MSHCP habitat.

Policy ER-8.4: Maintain and conserve superior examples of native trees (including oak trees), natural vegetation, stands of established trees, and other features for aesthetic and water conservation purposes.

Policy ER-8.5: Conserve the oak tree resources in the City to the extent feasible.

Goal ER-9: Protection of regional washes and waterways and their use for recreational and open space purposes such as trails, habitat preservation, and groundwater recharge.

Policy ER-9.1: Protect sensitive biological resources in the Temescal Canyon Area Plan through adherence to policies in the Western Riverside County MSHCP.

Policy ER-9.2: Conserve existing wetlands and wetland functions and values in the Temescal Canyon Wash, Prado Basin, and the Santa Ana River with a focus on conservation of existing riparian, woodland, coastal sage scrub, alluvial fan scrub, and open water habitats.

Policy ER-9.3: Conserve existing known populations of least Bell’s vireo and southwestern willow flycatcher within the Temescal Canyon Area Plan including locations at Prado Basin, Santa Ana River, and Temescal Wash. Maintain existing breeding habitat for these species at Prado Basin, Santa Ana River, and Temescal Wash where applicable to a particular project and location.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-28
Policy ER-9.4: Conserve and manage suitable habitat for species known to exist in the Temescal Canyon Area Plan of Western Riverside County’s Multiple Species Habitat Conservation Plan.

Policy ER-9.5: Conserve clay soils supporting sensitive plant species known to occur in the Temescal Canyon area, including Munz’s onion, Palmer’s grappling hook, smallflowered morning glory, long-spined spineflower, thread-leaved brodiaea, smallflowered microseris, and many-stemmed dudleya.

Policy ER-9.6: Conserve sandy soils co-occurring with chaparral supporting Palomar monkeyflower, known to occur in the Temescal Canyon area.

Policy ER-9.7: Conserve locations supporting California muhly, heart-lived pitcher sage, Hall’s monardella, and other sensitive plant species that may occur in a wide variety of habitat types within the Temescal Canyon Area Plan.

Policy ER-9.8: Provide for and maintain connection(s) from the Cleveland National Forest to Prado Basin and the Santa Ana River within Temescal Canyon, providing opportunities for offsite connections to Chino Hills State Park.

Policy ER-9.10: Conserve floodplain areas supporting sensitive plant species known to occur in Temescal Canyon, including Parry’s spineflower, peninsular spineflower, and smooth tarplant, and Coulter’s matilija poppy.

Policy ER-9.11: Conserve rocky soils co-occurring with coastal sage scrub, peninsular jumper, or chaparral supporting Payson’s jewelflower, known to occur in the Temescal Canyon area.

Policy ER-9.12: Provide for and maintain a continuous linkage along Temescal Wash from the southern boundary of the Temescal Canyon area to the Santa Ana River.

4.4.5 PROJECT DESIGN FEATURES
No biological resource project design features.

4.4.6 THRESHOLDS OF SIGNIFICANCE
Criteria for determining the significance of impacts related to biological resources are based on criteria contained in Appendix G of the State CEQA Guidelines and the City’s CEQA Manual. The proposed Project could have a significant impact on the environment if it would:

Threshold BIO-1 Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-29
Threshold BIO-2 Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
Threshold BIO-3 Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Threshold BIO-4 Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Threshold BIO-5 Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Threshold BIO-6 Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?

METHODOLOGY
The following analysis is based, in part, on information provided by the Biological Technical Report for the Green River Specific Plan, prepared by Glenn Lukos Associates, Inc. dated April 2, 2024 (Appendix D-1); Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis for impacts to MSHCP Riparian/Riverine Area Green River Ranch Industrial Project, prepared by Glenn Lukos Associates, Inc. dated April 11, 2024 (Appendix D-2); and Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis, prepared by Glenn Lukos Associates, Inc. dated April 11, 2024 (Appendix D-3). The information obtained from these sources and other relevant materials was reviewed to evaluate the potential presence of biological resources on the Project site.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-30

4.4.7 ENVIRONMENTAL IMPACTS ASSOCIATED WITH MODIFIED

PROJECT
Impacts
Would the
Modified
Project result in
new or more
severe impacts
requiring
revisions to the
Prior EIR?
Would the
Modified
Project be
implemented
under changed
circumstances
resulting in new
or more severe
impacts
requiring
revisions to the
Prior EIR?
Is there new
information that
would result in
new or more
severe impacts
from the
Modified
Project requiring
revisions to the
Prior EIR?
Would the
Modified Project
result in
eliminated,
reduced, or no
changes to impacts
and no changes to
the Prior EIR are
required?
Would the Project:

BIO-1 Have a substantial adverse
effect, either directly or
through habitat
modifications, on any
species identified as a
candidate, sensitive, or
special status species in
local or regional plans,
policies, or regulations, or
by the California
Department of Fish and
Game or U.S. Fish and
Wildlife Service.

BIO-2 Have a substantial adverse
effect on any riparian
habitat or other sensitive
natural community
identified in local or
regional plans, policies,
regulations or by the
California Department of
Fish and Game or U.S.

Fish and Wildlife Service.

BIO-3 Have a substantial adverse
effect on state or federally
protected wetlands
(including, but not limited
to, marsh, vernal pool,
coastal, etc.) through
direct removal, filling,
hydrological interruption,
or other means.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-31
Impacts
Would the
Modified
Project result in
new or more
severe impacts
requiring
revisions to the
Prior EIR?
Would the
Modified
Project be
implemented
under changed
circumstances
resulting in new
or more severe
impacts
requiring
revisions to the
Prior EIR?
Is there new
information that
would result in
new or more
severe impacts
from the
Modified
Project requiring
revisions to the
Prior EIR?
Would the
Modified Project
result in
eliminated,
reduced, or no
changes to impacts
and no changes to
the Prior EIR are
required?
Would the Project:

BIO-4 Interfere substantially
with the movement of any
native resident or
migratory fish or wildlife
species or with established
native resident or
migratory wildlife
corridors, or impede the
use of native wildlife
BIO nursery sites. -5 Conflict with any local
policies or ordinances
protecting biological
resources, such as a tree
preservation policy or
ordinance.

BIO-6 Conflict with the
provisions of an adopted
Habitat Conservation
Plan, Natural Community
Conservation Plan, or
other approved local,
regional, or state habitat
conservation plan.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-32

IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT
Impact BIO-1: Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
New information that would result in new or more severe impacts from the Modified Project requiring revisions to the Prior EIR.

As previously stated in the 2001 EIR, construction of the Approved Project would result in the loss of common plant species. One special status plant species was observed with the updated survey for the Modified Project and includes Coulter's matilija poppy. This species is a covered species under the MSHCP. This species is not a state or federally listed species, but is classified as Rank 4. As summarized in Table 3-1 of the Biological Study, Rank 4 species are currently thought to be limited in distribution or range whose vulnerability or susceptibility to threat is currently low. Given the low sensitivity of this species and the limited presence within the Modified Project site, impacts to the matilija poppy would be less than significant.

Three special-status birds were observed during the updated biological surveys for the Modified Project including yellow warbler, southern California rufous-crowned sparrow and least Bell’s vireo. The Project would impact habitat for the rufous-crowned sparrow, least Bell’s vireo, and yellow warbler. Additionally, the Project would remove habitat with the potential to support white-tailed kite and would reduce the suitable foraging and/or nesting habitat (e.g., chaparral, coastal sage scrub, oak woodland, and scrub oak chaparral). The rufous-crowned sparrow is not listed and is not a California Species of Concern, but does have a S3 State Ranking, and therefore is marginally considered to have special-status. However, based on the relatively low sensitivity ranking, broad distribution, and limited impact by the Project compared to the large range of species and the Project’s adjacency to MSHCP conservation areas to the south and to the west where proximate foraging habitat is available, impacts to the rufous-crowned sparrow would be less than significant.

Impacts to the least Bell’s vireo and yellow warbler that would occur upon development of the Commercial component would be potentially significant. However, as the MSHCP provides coverage for both species, the Project’s participation in the MSHCP through mandatory MSHCP fee payments and compliance with the biological requirements of the MSHCP ensures that any impacts to covered special status plants would be less than significant. In addition, the loss of habitat for the least Bell’s vireo would require mitigation and the impacts would require the approval of a DBESP by the Wildlife Agencies.

Construction of the BPI Industrial Development would potentially impact least Bell’s vireo, and as part of the JPR process for the development project RCA is requiring construction

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-33
mitigation for such indirect impacts. This is considered to be a significant impact requiring mitigation. MM 4.7.3.A and MM 4.7.3.B (alternative) remain applicable to the Modified Project to reduce impacts to Migratory Birds to a less than significant level. With the inclusion of additional construction mitigation contained in MM BIO-1 for indirect impacts to the least Bell’s vireo, impacts would be mitigated to less than significant.

Mitigation Measure MM BIO-1: If construction will occur within 300 feet of potential vireo habitat between March 15 and September 30, a biologist shall determine whether vireo individuals are present within the adjacent habitat. If work will start prior to March 15 and continue into the vireo season, or will start between March 15 and April 30, the biologist shall survey the adjacent habitat weekly for eight weeks[1] starting on or around March 15 until vireo are detected, or until eight visits are completed and the vireo is confirmed absent. If construction work will start after April 30, then surveys will start on or around April 10 (the formal start of the vireo survey period), and surveys will follow the survey intervals as stated above.

If vireo individuals are detected, the biologist will determine necessity and applicability of measures to address edge effects for construction activities occurring within 300 feet of occupied vireo habitat to protect the vireo. At minimum the following are recommended.
1) Noise: Given the proximity of the vireo habitat to the existing Green River Road and the adjacent SR-91, there is already an existing noise baseline from heavy traffic use, and it is possible that construction noise would not exceed that baseline. The Project proponent will retain a qualified biologist to perform noise monitoring to determine the ambient noise level at the habitat edge without construction activities occurring within 300 feet of the habitat edge, and then determine noise levels while construction activities are occurring. If it is determined that with construction, the noise levels exceed the ambient levels, then noise attenuation measures may be implemented, including the construction of a temporary noise attenuation barrier (sound wall) along the disturbance limits north of Green River Road. If it is determined that noise levels cannot be attenuated, then the specific construction activities resulting in the noise will need to be temporarily ceased until August 31, or prior if it is determined through surveys that the vireo are no longer present.
2) Lighting: Any night lighting needed during construction within 300 feet of occupied vireo habitat will be down shielded or directed away from the vireo habitat to prevent the illumination of the adjacent habitat.
3) Dust Emissions: The Project, as a part of standard best management practices (BMPs) pursuant to South Coast Air Quality Management District Rule 403, will introduce dust control measures for the duration of construction activities to minimize any dust-related effect on adjacent vireos.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-34
4) Trespassing: Prior to the start of construction activities along the northern side of Green River Road, the edge of the disturbance limits adjacent to the vireo habitat will be demarcated with orange construction fencing to prevent trespassing into the adjacent habitat. In addition, the Project proponent will implement an Environmental Awareness Training program prior to the start of construction to advise workers of sensitive biological areas adjacent to the development footprint, including the habitat areas north of Green River Ranch Road.

In 2019 the Crotch Bumble Bee was listed as a State Candidate Endangered (SCE) Species.

Crotch bumble bee was observed onsite during focused surveys for this species. The overall Study Area supports potentially suitable habitat for the Crotch bumble bee primarily within the non-native grasslands and within the scrub; however, this species is a habitat generalist as it will occur in a variety of plant communities throughout its range. Individuals were detected on the lower slopes in the southern portion of the Project’s impact footprint where the grassland areas are less disturbed and native scrub vegetation is present. Furthermore, if Crotch bumble bee remains as a SCE or has otherwise been confirmed as a State Endangered species at the time of Project site disturbance, then an Incidental Take Permit (ITP) may be required prior to the disturbance of the occupied habitat. Impact would be considered potentially significant.

The following mitigation measure which includes the conservation of 50.96 acres of scrub habitat and 26 acres of non-native grasslands and conservation of open space will offset impacts to the Crotch Bumble Bee and bring impacts to a less than significant level.

Mitigation Measure MM BIO-2: If the bumble bee is still a Candidate species or has been confirmed as a State listed species at the time of Project site disturbance, then prior to the issuance of a grading permit that would remove Crotch bumble bee habitat:
1) The Project proponent shall have conveyed or have an agreement to convey approximately 50.96 acres of various scrub habitats and 26 acres of non-native grassland in the southern portion of the Project site to the RCA, which constitutes avoidance of suitable habitat.
2) If the land to be conserved in the southern portion of the Project site has not been conveyed to the RCA and no agreement is yet in place to convey the property, the Project proponent shall coordinate with CDFW to address the extent of impacts and determine whether an ITP for Crotch bumble bee would be required. If an ITP were required, then mitigation may be required by CDFW as part of the ITP process, and the conservation of the comparable open space habitat would be presented to support the ITP.

This impact is new information or more severe impact as a result of the Modified Project, however, with the addition of Mitigation Measure MM BIO-2 impacts would be reduced to a less than significant level.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-35
As identified in the 2001 EIR for the Approved Project, suitable habitat occurs onsite for Plummer’s mariposa lily and intermediate mariposa lily and they have a moderate potential to occur onsite. These species were not observed during the updated surveys for the Modified Project. Many-stemmed dudleya and Brauton’s milk-vetch have a low likelihood of occurring onsite. These species were not observed during the updated surveys for the Modified Project, therefore impacts remain similar to those identified in the 2001 EIR for the Approved Project, which is less than significant.

Several sensitive wildlife species were observed on site during the updated surveys for the Modified Project. Several other sensitive wildlife species have at least a moderate potential to occur on site, identified within Appendix A and Append B of the Biological Technical Report.

As identified within the 2001 EIR for the Approved Project, short-term impacts may occur to the species as a result of construction activities. These species are not protected by federal or state listings as threatened or endangered and any loss of individuals would not threaten their regional populations. Removal of their habitat represents a less than significant impact to regional populations of these species.

As identified within the 2001 EIR, implementation of the Approved Project would result in a direct loss of at least one California gnatcatcher and occupied live-in habitat for the species.

While the loss of habitat for the species is now covered by the MSHCP, the Modified Project prohibits clearing occupied habitat during breeding season (March 1 through August 31).

These impacts remain potentially significant for the Modified Project. Mitigation Measure

4.7.1.A remain applicable to the Modified Project to reduce impacts to California gnatcatcher to a less than significant level.

The 2001 EIR concluded implementation of the Modified Project would result in potential impacts to migratory birds and the nests. Mitigation Measure 4.7.3.A and Mitigation Measure 4.7.3.B (alternative) remain applicable to the Modified Project to reduce impacts to Migratory Birds to a less than significant level.

With the inclusion of the additional Mitigation Measure for the Crotch Bumble Bee, Impacts would be more severe impacts from the Modified Project requiring revisions to the Prior EIR. With the include of the additional Mitigation Measure MM BIO-1 for the Crotch Bumble Bee, impacts are reduced to a less than significant level.

Impact BIO-2: Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-36
Under the Modified Project, a total of 2.10 acres of Regional Board jurisdiction would be permanently impacted (all non-wetland waters), including 2.07 acres onsite and 0.03 acre offsite.

A total of 3.66 acres of CDFW Jurisdiction would be permanently impacted as part of the BIP Development. This includes 2.51 acres of non-riparian streambed and 1.15 acres of riparian streambed.

As identified in the 2001 EIR of the Approved Project, a total of 1.76 acres of Corps/RWQCB jurisdiction and 9.81 acres of CDFW jurisdiction would be impacted as a result of the Approved Project implementation. Per the 2001 EIR Mitigation Measure 4.7.2.A, impacts to riparian habitat would be replaced through creation of new riparian habitat at a minimum of

1.5:1 onsite or alternatively, or in combination with onsite crease, riparian or wetlands mitigation credits shall be acquired in an offsite mitigation bank at a replacement ratio of 2:1.

While RWQCB impacts have slightly increase for the Modified Project, these impacts are minor. Furthermore, impacts to CDFW jurisdiction as a result of the Modified Project has decreased significantly. Mitigation Measure 4.7.2.A remains applicable for the Modified Project with the clarification that impacts to the 3.66 acres of CDFW jurisdiction shall be mitigated at a greater than 3:1 ratio (11.14 acres). The Mitigation would be a combination of onsite restoration and preservation, and purchase of offsite mitigation bank (Riverpark Mitigation Bank). The onsite mitigation would consist of restoration of 2.57 acres of riparian oak woodland and preservation of 3.80 acres of oak woodlands and streams. The remaining balance of 4.68 acres would be purchased at a Mitigation bank. As such, Mitigation Measure

4.7.2.A would be clarified to include the following language.

Mitigation Measure 4.7.2A All riparian habitat impacted (i.e., removed) by the proposed project shall be replaced through creation of new riparian habitat of equal or greater quality. Permanent impacts to 3.47 acres of CDFW jurisdiction (including 1.96 acres of potential Corps/RWQCB jurisdiction) shall be mitigated through the combination of onsite restoration and preservation, and offsite mitigation (Riverpark Mitigation Bank: Should Riverpark Mitigation Bank become unavailable in the future, an alternative mitigation strategy through another mitigation bank within the MSHCP Plan Boundary shall be reviewed and approved by the RCA and Wildlife Agencies (CDFW and USFWS) prior to issuance of a grading permit). The onsite mitigation will consist of the restoration of 2.57 acres of riparian oak woodland and the preservation of 6.36 acres of oak woodlands and streams. The balance of mitigation would consist of 4.62 acres would be purchased at a Mitigation bank.

It is anticipated that project construction will require permits or approvals from the CDFW (per Section 1601/1603 of the Fish and Game Code), and RWQCB (per Section 401 of the federal Clean Water Act).

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-37
If habitat creation is conducted on site, the replacement ratio shall be a minimum of

1.5:1(create 1.5 acres of habitat for each 1 acre impacted). Suitable locations for onsite creation of habitat include proposed debris basins and drainage corridors that may be retained or established in the proposed estate residential area. Any portions of the basins that are used for habitat creation will be excluded from any debris removal, sediment removal, or other maintenance operations. The created habitat shall be retained in a natural condition in perpetuity. Since the existing coast live oak woodland is primarily associated with drainage courses, oak woodlands established as mitigation for measures 4.7.4A will also qualify as created riparian habitat if established in riparian settings including in or adjacent to the proposed debris basins.

With the clarification language for the Modified Project, impacts would be less than significant within mitigation, as previously identified in the 2001 EIR for the Approved Project.

Impact BIO-3: Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The biological studies prepared for the Modified Project determined the site does not support any wetlands. Consequently, no impact to state or federally protected wetlands would occur and no mitigation is required.

Impact BIO-4: Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The Modified Project will impact the lower portions of north-south ridges and canyons that terminate at the flat portion of the property at Green River Road that support the local movement of wildlife.

As discussed above, the City is currently pursuing a Criteria Refinement through the RCA and Wildlife Agencies to formally relocated PCL-1 west to coincide with the B Canyon area.

Additional information and environmental analysis of the Alternative Alignment of PCL-1 can be found in Section 5.0. The processing of the Criteria Refinement coincides with the RCA’s

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-38
recent acquisition of approximately 740 acres of lands located south and west of the Project site that contain B Canyon. The RCA issued Criteria Refinement Review Findings (CR# 24- 01-10-01, dated February 20, 2024) in support of the Criteria Refinement stating approval of the realignment of PCL-1. The findings letter is included as Appendix D-4.

The formal relocation of PCL-1 removes the Modified Project site from the Linkage and thereby greatly reduces the relative importance of the Project site to facilitate wildlife movement and to connect Core A and Core B. In further support of the assembly of PCL-1, the Modified Project proponent is proposing to conserve 80.77 acres of land within the southern half of the site. The proposed conservation is contiguous with the lands recently acquired by the RCA for the MSHCP Reserve. The 80.77 acres of proposed conservation contains the structural topography and vegetative cover to facilitate regional wildlife movement. It aligns with the wildlife linkage/corridor conservation goals of the MSHCP.

The Modified Project includes the construction of a wildlife fence between the proposed MSHCP conservation areas and the of the Project. The fencing will be constructed along the western and southern edges of the Project site to direct wildlife to the west along the rerelocated PCL-1 Route in B Canyon. The fence will start at the eastern property boundary, extending west along the limits of the proposed MSHCP Conservation until the fence reaches the western boundary shared with the existing MSHCP Additional Reserve Lands. Then the fence will turn north along the property boundary to the terminus of Fresno Road, then northwest where the fence will terminate at the limits of Caltrans’ easement for SR-91. The fence is proposed to be chain link (at least 8 feet tall) and will include one-way swing gates to allow for wildlife escape access to the open space to the south and west.

Temporary disturbances to wildlife movement may occur during construction; however, these disturbances would primarily occur during day-time hours during construction activities and would not interfere significantly with wildlife movement on a landscape level. The Project’s consistency with the MSHCP and adherence to mandatory MSHCP requirements would reduce impacts to wildlife movement to a level of less than significant under CEQA.

Additionally, no native wildlife nursery sites were observed within the Project area and therefore, no impacts to wildlife nursery sites would occur.

The Project’s construction activities have the potential to impact active bird nests if vegetation is removed during the nesting season (February 1 to September 15). To avoid impacts to nesting birds, as identified within the 2001 EIR Mitigation Measure 4.7.3.A and Mitigation Measure 4.7.3.B (alternative) remain applicable to the Modified Project to reduce impacts to Migratory Birds to a less than significant level.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-39
Impact BIO-5: Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The 2001 EIR identified 3.90 acres of coast live oak that would be impacted as a result of the Approved Project. Mitigation Measures 4.7.4.A through 4.7.4.E was included to mitigate for the impacts associated with coast live oak woodlands to a less than significant level.

The Modified Project would also implement Mitigation Measures 4.7.4.A through 4.7.4.E to reduce impacts to coast live oak. However, the Modified Project would impact 1.13 acres of coast live oak woodland, which is significantly less impacts than the Approved Project.

Furthermore, the Modified Project would avoid and conserve 3.50 acres of coast live oak woodland. Therefore, the Modified Project reduces impacts to coast live oak woodland in comparison to the Approved Project.

While the City has no direct tree preservation ordinance, the City’s 2020–2040 General Plan includes several goals and policies relating to biological resources. The goals and policies of the General Plan are intended to support consistency with the MSHCP and to protect and preserve biological resources including plants and wildlife, vegetation communities, and wetlands and drainages.

The Project will not conflict with any local policies or ordinances protecting biological resources. The Project proponent is proposing permanent conservation of 80.77 acres of land within the southern half of the Study Area, and all development associated with the Modified Project will comply with the requirements of the MSHCP. The conservation of native land and compliance with the MSCHP in conjunction with avoidance, minimization, and mitigation will render the Project compliant with and not conflict with the biological resource policies of the City of Corona 2020–2040 General Plan. With implementation of Mitigation Measures

4.7.4.A through 4.7.4.E, impacts are considered less than significant.

Impact BIO-6: Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

The Modified Project occurs within the MSHCP Temescal Area Plan, specifically in Subunit 1 (Santa Ana River to Santa Ana Mountains), Criteria Cells 1702, 1704, 1811, and 1812 [Exhibit 5A – MSHCP Overlay Map]. Lands described for conservation within these Criteria Cells are intended support the assembly of Proposed Constrained Linkage 1 (“PCL-1”) and

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-40
Proposed Constrained Linkage 2 (“PCL-2”) further to the east. The City is currently pursuing a Criteria Refinement through the RCA and Wildlife Agencies to formally relocate PCL-1 west to coincide with the B Canyon area. Additional information and environmental analysis of the Alternative Alignment of PCL-1 can be found in Section 5.0. The processing of the Criteria Refinement coincides with the RCA’s recent acquisition of approximately 740 acres of lands located south and west of the Specific Plan Project that contain B Canyon. The RCA issued Criteria Refinement Review Findings (CR# 24-01-10-01, dated February 20, 2024) in support of the Criteria Refinement stating approval of the realignment of PCL-1. The findings letter is included as Appendix D-4.

The formal relocation of PCL-1 removes the Modified Project site from the Linkage and thereby greatly reduces the relative importance of the Project site to facilitate wildlife movement and to connect Core A and Core B. Even with the approval of the Criteria Refinement, i.e., the relocation of PCL-1, the Modified Project is still subject to JPR for the RCA to determine the Project’s overall consistency with the MSHCP; however, the Modified Project would no longer be required to conserve lands in support of the original PCL-1 alignment. Regardless, the Modified Project would conserve approximately 80.77 acres of land within the southern half of the site to contribute to the MSHCP Reserve. The conserved lands would be dedicated to the RCA and managed and protected in perpetuity.

The Modified Project would impact approximately 3.66 acres of MSHCP riparian/riverine areas, including 1.15 acres of riparian vegetation and 2.51 acres of unvegetated riverine areas.

The functions of impacted MSHCP riparian areas must be replaced such that the resulting project is “biologically equivalent or superior” to the existing site conditions. A DBESP must be approved by the wildlife agencies (USFWS and CDFW) for the proposed Modified Project.

Per the submitted DBESP prepared by GLA on January 17, 2022 and revised August 29, 2024 included as Appendix E-2, the modified Project avoids a total of 80.77 acres in the southern portion of the site, and protect in perpetuity 6.36 acres which contain 2.57 acres of riparian/riverine areas and 3.80 acres of coast live oak woodland.

In comparison, of the 3.66 acres of impacts to riparian/riverine areas, more than half of the impacts (2.07 acres) include drainage features in the northern portion of the Project site that have been disturbed through past land uses, with 1.01 acres mapped as disturbed or developed;

0.96 acre as supporting vegetation associated with ruderal areas, including non-native grasses and forbs; and 0.10 acre in areas mapped as residential/urban/exotic. These drainage features do not contain habitats described for conservation, nor do they contain habitat that support Section 6.1.2 species. However, the Project will impact 1.59 acres of riverine areas supporting native vegetation communities, including 1.12 acres of coast like oak woodland, 0.03 acre of elderberry stands, and 0.44 acre of native upland scrub. The coast live oak woodland and elderberry stands are classified as riparian communities.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-41
With the implementation of Mitigation Measure 4.7.2.A, impacts would be less than significant. Furthermore, with the realignment and conservation of PCL-1, the Project would conserve 80.77 acres of lands, which increases habitat for sensitive and listed species. These lands would be protected in perpetuity via the MSHCP Reserve to support Covered Species.

Lastly, the Project will conserve and protect 2.57 acres of riparian/riverine areas, including

3.80 acres of coast live oak woodland and 0.64 acre of native upland scrub communities (chaparral and Riversidean sage scrub. The Project will conserve habitat functions at a 2.5:1 to nearly 3:1 ratio to the quantity impacted. In addition, the Project will further mitigate impacts to 3.66 acres of MSHCP riparian/riverine areas through the onsite restoration of 2.57 acres of oak woodland and the additional purchase of 4.62 acres of mitigation credits at the Riverpark Mitigation Bank.

4.4.8 CUMULATIVE IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
Less than Significant Impact with Mitigation. Cumulative impacts are defined as the direct and indirect effects of a proposed project which, when considered alone, would not be deemed a substantial impact, but when considered in addition to the impacts of related projects in the area, would be considered potentially significant. “Related projects” refers to past, present, and reasonably foreseeable probable future projects, which would have similar impacts to the proposed Project.

Anticipated cumulative impacts are addressed by the MSHCP, which, as currently adopted, addresses 146 “Covered Species” that represent a broad range of habitats and geographical areas within western Riverside County, including threatened and endangered species and regionally- or locally-sensitive species that have specific habitat requirements and conservation and management needs. The MSHCP addresses biological impacts for take of Covered Species within the MSHCP area. Impacts to Covered Species and establishment and implementation of a regional conservation strategy and other measures included in the MSHCP are intended to address the federal, state, and local mitigation requirements for these species and their habitats.

Impacts to the special-status vegetation communities could be potentially cumulatively significant, prior to mitigation. These vegetation communities are Coast Live Oak Woodland, Coastal Sage Scrub, Elderberry Savannah, and Riparian/Riverine resources for the Modified Project. For those non-riparian/riverine vegetation communities, the MSHCP provides full mitigation for proposed impacts. For the proposed impacts to riparian/riverine resources, the MSHCP requires equivalent or superior preservation that is detailed in a DBESP. As presented above, the Modified Project would mitigate 3.04 acres of riparian/riverine resources (1.11 acres of riparian and 1.93 acres of unvegetated streambed). This would mitigate impacts to a level

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-42
of less than significant under CEQA and would be consistent with MSHCP requirements in that equivalent or superior preservation is provided.

The proposed BPI Project would remove several Coulter’s matilija poppy, a non-listed special status plant species that is covered and adequately conserved by the MSHCP. The removal of Coulter’s matilija poppy by the Modified Project would not pose a cumulatively considerable contribution to the regional decline of this species.

Impacts to the following animal species would be potentially cumulatively significant, prior to mitigation, as a result of the loss of potential habitat for these species: Crotch’s bumble bee, least Bell’s vireo, Cooper’s hawk, yellow warbler, southern California rufous-crowned sparrow, western mastiff bat, western yellow bat, coast horned lizard, coast patch-nosed snake, coastal whiptail, orange throat whiptail, red-diamond rattlesnake, and southern California legless lizard.

Some of these species are fully covered species under the MSHCP and as such any proposed impacts would be fully mitigated under the MSHCP. For others such as the bat species, impacts would be potentially cumulatively significant, however the Project is proposing permanent natural land conservation in the southern portion of the Project site. With implementation of Project mitigation in combination with the Project’s proposed design feature of open space conservation, the potential for the Project to make a cumulatively considerable contribution to the regional decline of any of these species would not occur.

With implementation of the Modified Project’s open space and in combination with Mitigation Measure 4.7.1.A for impacts to California gnatcatchers, Additional information and environmental analysis of the Alternative Alignment of PCL-1 can be found in Section

5.0. for Crotch bumble bee, Mitigation Measure 4.7.2.A for mitigation for impacts to jurisdictional features, Mitigation Measure 4.7.3.A for nesting birds, Mitigation Measure BIO-1 for least Bell’s vireo, Mitigation Measure BIO-2 for Crotch’s bumble bee, Mitigation Measure 4.7.4 through 4.7.4.E for oak woodlands mitigation, the Modified Project would have a less than significant with mitigation cumulative impact regarding biological resources.

4.4.9 MITIGATION MEASURES IDENTIFIED IN PRIOR EIR APPLICABLE TO

MODIFIED PROJECT
With minor modifications in some instances, all mitigation as identified within the 2001 EIR are applicable to the Modified Project as follows.

4.7.1A: Prior to issuance of grading permits for each increment of development, applicable pre-construction California gnatcatcher surveys shall be conducted and a survey report approved by the City. The report shall identify mitigation for impacts to the California gnatcatcher consisting of acquiring and preserving California gnatcatcher habitat of equal or greater quality at a minimum

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-43
replacement ratio of 1:1 (acquire at least 1 acre for each acre impacted). The Modified Project would impact 8 acres of habitat used by the California gnatcatcher; therefore, mitigation shall consist of the acquisition and preservation of at least 8 acres of occupied habitat. The acquired habitat shall be in a location that facilitates management for the species (i.e., currently supports the species and is contiguous with a larger area that will be managed for conservation of the species). Potential suitable locations include areas adjacent to existing reserves (such as Stephens’ kangaroo rat reserves) or within established mitigation banks for the California gnatcatcher.

Project impacts to the California gnatcatcher and its designated critical habitat may require consultation or other permitting for compliance with the federal ESA that may result in requirements for additional mitigation measures beyond those described above.

4.7.2A: Prior to issuance of grading permits for each increment of development, applicable pre-construction riparian area surveys shall be conducted and a survey report approved by the City. The report shall identify all riparian habitat impacted (i.e., removed) by the proposed project and such impacted areas shall be replaced through creation of new riparian habitat of equal or greater quality.

Impacts to 3.66 acres of CDFW jurisdiction (including 2.10 acres of potential RWQCB jurisdiction) shall be mitigated at a 3:1 ratio (10.98 acres) through the combination of onsite restoration and preservation, and offsite mitigation (Riverpark Mitigation Bank). The onsite mitigation will consist of the restoration of 2.57 acres of riparian oak woodland and the preservation of 6.36 acres of oak woodlands and streams. The balance of mitigation would consist of 4.62 acres would be purchased at a Mitigation bank.

It is anticipated that project construction may require permits or approvals from the CDFW (per Section 1601/1603 of the Fish and Game Code) and RWQCB (per Section 401 of the federal Clean Water Act),.

4.7.3A: Prior to the commencement of tree removal or grading on the proposed project site during the nesting season (March-July), all suitable habitat shall be thoroughly surveyed for the presence of nesting birds by a qualified biologist.

If any active nests are detected, the area shall be flagged and avoided until the nesting cycle is complete. In addition, a biologist shall be present on site to monitor the tree removal and grading to ensure that any nests detected during the initial survey are not disturbed.

4.7.3B: (Alternative) Tree removal and grading shall be delayed until after the nesting season (March-July).

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-44

4.7.4A: Prior to issuance of grading permits for PA 1, 2, 3, and 5, the project shall comply with the City’s Hillside Development Overlay Ordinance. This mitigation was previously introduced as mitigation measure 4.6-1. This Ordinance promotes the use of residential clustering techniques and their measures to minimize impacts on hillside sites, typically areas containing oak trees. Home sites shall be clustered into the fewest number of acres possible to minimize the spread of impacts over a large portion of the property to reduce fragmentation of the remaining natural areas.

4.7.4B: Prior to issuance of grading permits for PAs 1, 2, 3, and 5, the applicant shall design an oak woodland management plan which includes the following:
• Provisions for ongoing maintenance, management, and construction impact practices for all oaks on site.
• Provisions for enhancing oak woodlands not within the development zone. • Provisions for limiting human and vehicular access to existing oak woodland areas in order to preserve habitat quality.
• Limitations on the use of herbicides or pesticides within the oak woodland areas.

4.7.4C: Prior to grading within PAs 1, 2, 3, and 5, the applicant shall conduct a revised Tree Survey, based on the staking of the specific limits of grading, to assess opportunities for transplanting the oak trees.

4.7.4D: Prior to issuance of building permits within PAs 1, 2, 3, and 5 a qualified native plant horticulturist shall determine the sensibility and likelihood of survival of transplanting 10 percent of the oak trees.

4.7.4E: Prior to certification of occupancy, the applicant shall replant 15-gallon size oaks at a ratio of 10 to 1 for all oaks lost but not transplanted. The location and methods for these plantings would be specified by a qualified native plant biologist/horticulturist.

4.4.10 NEW MITIGATION MEASURES APPLICABLE TO MODIFIED PROJECT MM BIO-1: If construction will occur within 300 feet of potential vireo habitat between March 15 and September 30, a biologist shall determine whether vireo individuals are present within the adjacent habitat. If work will start prior to March 15 and continue into the vireo season, or will start between March 15 and April 30, the biologist shall survey the adjacent habitat weekly for eight weeks[1] starting on or around March 15 until vireo are detected, or until eight visits are completed and the vireo is confirmed absent. If construction work

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-45
will start after April 30, then surveys will start on or around April 10 (the formal start of the vireo survey period), and surveys will follow the survey intervals as stated above.

If vireo individuals are detected, the biologist will determine necessity and applicability of measures to address edge effects for construction activities occurring within 300 feet of occupied vireo habitat to protect the vireo. At minimum the following are recommended.
1) Noise: Given the proximity of the vireo habitat to the existing Green River Road and the adjacent SR-91, there is already an existing noise baseline from heavy traffic use, and it is possible that construction noise would not exceed that baseline. The Project proponent will retain a qualified biologist to perform noise monitoring to determine the ambient noise level at the habitat edge without construction activities occurring within 300 feet of the habitat edge, and then determine noise levels while construction activities are occurring. If it is determined that with construction, the noise levels exceed the ambient levels, then noise attenuation measures may be implemented, including the construction of a temporary noise attenuation barrier (sound wall) along the disturbance limits north of Green River Road.

If it is determined that noise levels cannot be attenuated, then the specific construction activities resulting in the noise will need to be temporarily ceased until August 31, or prior if it is determined through surveys that the vireo are no longer present.
2) Lighting: Any night lighting needed during construction within 300 feet of occupied vireo habitat will be down shielded or directed away from the vireo habitat to prevent the illumination of the adjacent habitat. 3) Dust Emissions: The Project, as a part of standard best management practices (BMPs) pursuant to South Coast Air Quality Management District Rule 403, will introduce dust control measures for the duration of construction activities to minimize any dust-related effect on adjacent vireos.
4) Trespassing: Prior to the start of construction activities along the northern side of Green River Road, the edge of the disturbance limits adjacent to the vireo habitat will be demarcated with orange construction fencing to prevent trespassing into the adjacent habitat. In addition, the Project proponent will implement an Environmental Awareness Training program prior to the start of construction to advise workers of sensitive biological areas adjacent to

CITY OF CORONA
SEPTEMBER 202 4

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

BIOLOGICAL RESOURCES

ENPLANNERS

4.4-46
the development footprint, including the habitat areas north of Green River Ranch Road.

MM BIO-2: If the Crotch bumble bee is still a Candidate species or has been confirmed as a State listed species at the time of Modified Project site disturbance, then prior to the issuance of a grading permit that would remove Crotch bumble bee habitat the following measures shall be implemented:
• The Project proponent shall have conveyed or have an agreement to convey approximately 50.96 acres of various scrub habitats and 26 acres of nonnative grassland in the southern portion of the Project site to the RCA, which constitutes avoidance of suitable habitat.
• If the land to be conserved in the southern portion of the Project site has not been conveyed to the RCA and no agreement is yet in place to convey the property, the Project proponent shall coordinate with CDFW to address the extent of impacts and determine whether an Incidental Take Permit (ITP) for Crotch bumble bee would be required. If an ITP were required, then mitigation may be required by CDFW as part of the ITP process, and the conservation of the comparable open space habitat would be presented to support the ITP.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-1

4.5 CULTURAL RESOURCES

4.5.1 INTRODUCTION
This section provides a summary of applicable impacts and mitigation measures from the 2001 EIR, an overview of existing cultural resources within the GRRSP Planning Area and surrounding region, a summary of applicable regulations, and analyses of potential changes in impacts to cultural resources from implementation of the Modified Project in comparison to the Approved Project. No NOP comment letters, or Scoping Meeting comments were received pertaining to this topic.

This section of the Draft SEIR is based on the Phase I Cultural Resources Assessment for the Green River Ranch III Project (CRA), prepared by Brian F. Smith Associates, Inc. (BFSA), dated August 7, 2020, revised January 10, 2024 (Appendix F).

4.5.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The Approved Project impact analysis related to cultural resources as presented in the 2001 EIR as well as any mitigation measures identified to reduce significant impacts are summarized as follows:
b) Archeological resources?
c) Historical site or building?
d) Ethnic cultural values?
As stated in the 2001 EIR, the GRRSP area contained two manufactured homes, facilities for a horse boarding operation, and a church operating out of an old restaurant building. In addition, a 1939 concrete culvert at the extreme north end of the Project area was evaluated for consideration as a historic resource, but was not considered a historic resource and not eligible for inclusion in the National Register. The remainder of the Project area was undeveloped and no other potential historic structures existed on site. As a result, the 2001 EIR determined no impact would result.
e) Restriction of sacred uses?
Although the GRRSP area included a church on site, the 2001 EIR determined there were no known unique ethnic or cultural values associated with the site. In addition, there were no known religious or sacred uses on site which would be affected by the Approved development, and no significant impact on religious/sacred uses attributable to the Approved Project would be expected.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-2
Cumulative Impacts
The 2001 EIR determined there were no significant prehistoric or historic archeological resources located within the GRRSP Planning Area. As a result, the 2001 EIR determined, there was no cumulative impact anticipated by the implementation of Approved Project.

4.5.3 ENVIRONMENTAL SETTING
The GRRSP Planning Area is located in the northwestern portion of the Santa Ana Mountains at the eastern entrance to the Santa Ana Canyon. Topographically, the surrounding area of the GRRSP site slopes down north and west towards Wardlow Wash and the Santa Ana River, and slopes down to the north from the Santa Ana Mountain hillside to Green River Ranch Road.

The northern portion of the GRRSP Planning Area consists of gently sloping to almost flat terrain. However, the southern portion of the Planning Area is comprised of the steep slopes of the Santa Ana Mountains which are separated by seasonal drainages extending from higher elevations north through the property into the Santa Ana River and the Wardlow Wash.

Topographic elevation for the GRRSP Planning Area include ranges from approximately 515 to 1,800 feet above mean sea level (AMSL).

The Santa Ana Mountains are composed of Pleistocene nonmarine, Oligocene nonmarine, Upper Cretaceous, and Paleocene marine and include two faults, the Chino and the WhittierElsinore fault. The alluvial and aeolian deposition and faults combined with erosion processes are responsible for the modern appearance of the region.

Records Search
As stated in the CRA, A request was submitted to the Eastern Information Center (EIC) for a records search; however, due to the current pandemic (2020 COVID-19 outbreak), results of the archaeological records search have yet to be obtained. However, in support of the 2001 EIR, the entire property was surveyed in 1999 by LSA Associates, Inc., including four previous times (Kirkish and McCoy 1972; Leonard 1975; Lipp 1977; Tedlock 1977). None of these studies identified any cultural resources on the property. Although, a historic concrete culvert stamped “1939” was identified in the northern portion of the development, LSA evaluated the culvert as not eligible for the California Register of Historical Resources (CRHR) (LSA 2000).

A Sacred Lands File (SLF) search was also requested from the Native American Heritage Commission (NAHC). The NAHC SLF search did not indicate the presence of any sacred sites or locations of religious or ceremonial importance within the search radius.

Field Survey
BFSA conducted the survey of the GRRSP Planning Area on July 10, 2020 by Senior Field Archaeologist Clarence Hoff with assistance from field archaeologists James Shrieve. The archaeological survey of the Planning. Area was a reconnaissance consisting of a series of parallel survey transects spaced at approximately 10-meter intervals, except where the steep

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-3
slopes and dense vegetation prohibited systematic transects. The appropriate primary records form is included in the technical study contained in Appendix E.

4.5.4 PROJECT DESIGN FEATURES (PDF)
No Project Design Features are proposed for the Modified Project.

4.5.5 EXISITNG REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL REGULATIONS
National Historic Preservation Act (NHPA)
The NHPA of 1966 established a federal program to identify and protect historic places. It created the National Register of Historic Places, an inventory of districts, sites, buildings, structures, and objects deemed significant for their history, architecture, archaeology, engineering, or culture. The NHPA also requires federal agencies to consider the potential effects of their undertakings on historic properties. This process, outlined in Section 106 of the NHPA, ensures that consulting parties are identified, the significance of historic properties is assessed, and adverse effects are avoided, minimized, or mitigated.

STATE REGULATIONS
California Public Resources Code Section 5097.5
Public Resources Code section 5097.5 provides for the protection of cultural and paleontological resources and prohibits the removal, destruction, injury, or defacement of archaeological and paleontological features on any lands under the jurisdiction of State or local authorities.

California Register of Historical Resources Section 5020 State law also protects cultural resources by requiring evaluations of the significance of prehistoric and historic resources in CEQA documents. A cultural resource is an important historical resource if it meets any of the criteria found in Section 15064.5(a) of the State CEQA Guidelines. These criteria are nearly identical to those of the National Register.

The State Historic Preservation Officer (SHPO) maintains the California Register. Properties listed, or formally designated eligible for listing, on the National Register are nominated to the California Register and then selected to be listed on the California Register, as are the State Landmarks and Points of Interest.

California Penal Code Section 622.5
California Penal Code section 622.5 provides misdemeanor penalties for injuring or destroying objects of historic or archaeological interest located on public or private lands, but specifically excludes the landowner.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-4
California Health and Safety Code Sections 7050.5 and 7052 California Health and Safety Code section 7050.5 declares that in the event of the discovery of human remains outside a dedicated cemetery, all ground disturbance must cease and the county coroner must be notified. California Health and Safety Code section 7052 establishes a felony penalty for mutilating, disinterring, or otherwise disturbing human remains, except by relatives.

REGIONAL REGULATIONS
There are no regional regulations that apply to the Modified Project.

LOCAL REGULATIONS
City of Corona 2020-2040 General Plan
Historic Resources Element
Goal HR-3 Recognize the importance of archeological and paleontological resources and ensure the identification and protection of those resources within the City of Corona.

Policy HR-3.1 Require appropriate treatment/preservation of archaeological collections in a culturally appropriate manner, in accordance with state and federal standards, and in consultation with interested Native American tribes that have traditional cultural affiliation with the project area and/or the resources affected by the project.

Policy HR-3.2 Require that development proposals incorporate specific measures to identify, protect, and preserve cultural resources in the planning, environmental review, and development process.

Policy HR-3.3 Archaeological resources found prior to or during construction shall be evaluated by a qualified archaeologist and appropriate mitigation measures applied, pursuant to § 21083.2 of CEQA, before the resumption of development activities. Any measures applied shall include the preparation of a report meeting professional standards, which shall be submitted to the appropriate CHRIS information center.

Policy HR-3.4 Any project that involves earth-disturbing activities in an area determined to be archaeologically or culturally sensitive shall require evaluation of the site by a qualified archaeologist. The applicant shall implement the recommendations of the archaeologist, subject to the approval of the City. Planning Department.

Policy HR-3.5 Any project that involves earth-disturbing activities in an area determined to be archaeologically or culturally sensitive shall require consultation by the applicant with interested federally recognized American Indian Tribe(s) that have a traditional cultural affiliation with the project area and/or the resources affected by the project, for the purposes of determining resources impacts and appropriate mitigation to address such impacts.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-5
Applicant shall also arrange for monitoring of earth-disturbing activities by interested federally recognized American Indian Tribe(s) that have a traditional cultural affiliation with the project area and/or the resources affected by the project, if requested.

Policy HR-3.8 In the event of the discovery of a burial, human bone, or suspected human bone, all excavation or grading in the vicinity of the find shall halt immediately and the area shall be protected and the project applicant immediately shall notify the Riverside County Coroner and comply with provisions of the Health and Safety Code § 7050.5, including PRC § 5097.98, if applicable. If the find is determined to be Native American human remains, the applicant shall consult with the Most Likely Descendent to determine appropriate treatment for such remains.

4.5.6 THRESHOLDS OF SIGNIFICANCE
Based on the relevant CEQA Guidelines as currently implemented by the City of Corona, significant cultural resources impacts would occur if the proposed Project or any Projectrelated component would:

Threshold CUL-1 Cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5?
Threshold CUL-2 Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5?
Threshold CUL-3 Disturb any human remains, including those interred outside of dedicated cemeteries?

METHODOLOGY
Cultural resource impacts are assessed based on the potential for the Modified Project to significantly affect existing known and unknown historic and archaeological resources. The methodology entails identifying significant cultural resources and whether the Modified Project would cause a substantial adverse change in the significance of the resource. Examples of substantial adverse changes include physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of an historical resource would be materially impaired.

A review of the CRA comprised of an archaeological survey consisting of an institutional records search, a sacred lands file (SLF) search, and a pedestrian survey within the prior 164- acre Project Boundary (now 160 acres).

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-6

4.5.7 ENVIRONMENTAL IMPACTS
Impacts
Would the
Modified
Project result
in new or
more severe
impacts
requiring
revisions to
the Prior EIR?
Would the Modified
Project be
implemented under
changed
circumstances
resulting in new or
more severe impacts
requiring revisions to
the Prior EIR?
Is there new
information that
would result in
new or more severe
impacts from the
Modified Project
requiring revisions
to the Prior EIR?
Would the
Modified Project
result in
eliminated,
reduced, or no
changes to
impacts and no
changes to the
Prior EIR are
required?
Would the project:

CUL-1 Cause a substantial
adverse change in
the significance of a
historical resource
pursuant to §
15064.5?
CUL-2 Cause a substantial
adverse change in
the significance of
an archaeological
resource pursuant to
§ 15064.5?
CUL-3 Disturb any human
remains, including
those interred
outside of dedicated
cemeteries?

IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT
Impact CUL-1: Cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5?
Eliminated, Reduced, or No Changes to Impacts and No Changes to the Prior EIR are Required.

An adverse effect is found when a project may alter, directly or indirectly, any of the characteristics of a historic resource that would diminish the integrity of the property’s location, design, setting, materials, workmanship, feeling, or association. Substantial adverse change in the significance of an historical resource means physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of an historical resource would be materially impaired (CEQA, Title 14, Chapter 3, p78; Federal Register, 36 CFR Part 800).

As discussed in the Project Description, no changes in the location, size, or boundaries of the GRRSP Planning Area boundary have occurred since adoption of the GRRSP in 2001. In

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-7
addition, the Modified Project would modify the size and boundaries of the GRRSP, however minimally in the northern portion of the Project site. In addition, the eastern portion of the Project site has been slightly expanded to incorporate appropriate grading limits within the hilly terrain. As such, BFSA conducted this updated assessment to locate and record any cultural resources identified within the Modified Project boundary in compliance with the California Environmental Quality Act (CEQA) and following City of Corona Environmental Guidelines.

As stated in the CRA prepared for the Modified Project, the previously discussed 1939 culvert recorded by LSA has been completely replaced when the City of Corona conducted improvements to Green River Road between 2015 and 2016. Although the 1939 culvert has been replaced, additional historic features were identified in the Modified Project’s CRA within the GRRSP Planning Area. Within the CRA, BFSA identified these features as Site Temp-1 of which consist of a board-formed concrete water tank, a concrete-lined reservoir, and a front-gabled cinderblock garage. Based upon aerial photographs and property research, Site Temp-1 appears to be associated with the ranching operations first visible on aerial photographs from 1946. However, Site Temp-1 is not eligible for listing on the CRHR and do not qualify as significant resources under CEQA. As determined in the CRA prepared for the Modified Project, there are no significant resources identified within the GRRSP Planning Area. Therefore, no new or substantially greater impacts related to historical resources would occur with implementation of the proposed Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
No mitigation measures are required.

Impact CUL-2: Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5?
Change in Circumstance or New Information Requiring Major or Minor EIR Revisions.

The archaeological surveys conducted within the GRRSP Planning Area for the 2001 EIR revealed no archaeological or cultural resources. Similarly, the CRA prepared for the Modified Project (Appendix E) determined that no significant resources were identified within the GRRSP Planning Area boundary. However, the CRA states that given the prior disturbance and historic use of the Project site, and the proximity to multiple natural sources of water, unknown buried archaeological deposits may be encountered within the Planning Area during grading operations. Due to current best practices and the City’s General Plan, it is understood that unknown resources may be encounter during development of the Modified Project may occur resulting in a significant impact.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-8
As stated below in Mitigation Measure, MM CUL-1, all earthwork for development of the Modified Project would be required to be monitored by a qualified archaeologist and protocols within the Mitigation Monitoring Reporting Program (MMRP) are to be followed. As a result, with implementation of MM CUL-1 impacts to unknown archaeological resources would be reduced to less than significant. However, no substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
The Modified Project introduces the following Mitigation Measures and are further described in detail Section 4.5.10.
• MM CUL-1 Mitigation Monitoring and Reporting Program (MMRP) Impact CUL-3: Disturb any human remains, including those interred outside of dedicated cemeteries?
Change in Circumstance or New Information Requiring Major or Minor EIR Revisions.

As previously stated, no changes in the location, size, or boundaries of the Specific Plan area have occurred since the 2001 EIR. In addition, the Modified Project would modify the size and boundaries of the GRRSP, however minimally. No evidence suggesting the area has been utilized in the past for human burials has been identified in the approved GRRSP Planning Area. Nevertheless, the remote potential exists that human remains may be unearthed during grading and excavation activities associated with Modified Project construction should Project-related construction activities extend into previously undisturbed soils.

As stated in Mitigation Measure, MM CUL-2, in the unlikely event human remains are discovered during grading or construction activities within the area, compliance with State law (Health and Safety Code § 7050.5) (HSC § 7050.5) would be required. As stated in the City’s General Plan, these requirements have been imposed on any construction activity in which human remains are detected after certification of the 2001 EIR. Therefore, the potential to encounter human remains would occur as a result of the Modified Project and implementation of MM CUL-2 would be required per State Law and render potential impacts to less than significant. However, no substantially greater impacts would occur with implementation of the Modified Project when compared to those identified in the 2001 EIR.

Mitigation Measure
The Modified Project introduces the following Mitigation Measures and are further described in detail Section 4.5.10.
• MM CUL-2 Human Remains

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-9

4.5.8 CUMULATIVE IMPACTS ASSOCIATED WITH THE MODIFIED

PROJECT
As stated in the 2001 EIR, the cumulative impact area for cultural resources is the City of Corona. Similar to the Modified Project, the 2001 EIR determined no significant prehistoric or historic archeological resources were located within the Project area. Moreover, the previously identified concrete culvert located at the north end of the Project area was evaluated for consideration as a historic resource is not considered a historic resource and is not eligible for inclusion in the National Register. Therefore, as determined in the 2001 EIR, there are no cumulative impact anticipated by the implementation of the Modified Project.

4.5.9 MITIGATION MEASURES IDENTIFIED IN PRIOR EIR APPLICABLE TO

MODIFIED PROJECT
No mitigation measures were included in the 2001 EIR.

4.5.10 NEW MITIGATION MEASURES APPLICABLE TO MODIFIED PROJECT The Modified Project introduces the following Mitigation Measures and are further described in detail below. In some instances, the new measures to be implemented reflect current regulations and/or best practices, but the measures substantively accomplish the same level of significance as the 2001 EIR.

MM CUL-1: Mitigation Monitoring and Reporting Program (MMRP) - As a condition of project approval, a MMRP is recommended to identify any cultural resources that may be uncovered during grading, and subsequently, to mitigate potential impacts to any discovered archaeological resources evaluated as significant.

This program shall include, but not be limited to, the following actions:
1) Prior to issuance of a grading permit, the applicant shall provide written verification in the form of a letter from the project archaeologist to the lead agency stating that a certified archaeologist has been retained to implement the monitoring program.
2) The project applicant shall provide Native American monitoring during grading when the archaeological monitor identifies undisturbed soil or Native American artifacts. The Native American monitor shall work in concert with the archaeological monitor to observe ground disturbances and search for cultural materials when the potential exists to encounter prehistoric artifacts.
3) The certified archaeologist shall attend the pre-grading meeting with the contractors to explain and coordinate the requirements of the monitoring program.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-10
4) During the cutting of previously undisturbed deposits, the archaeological monitor(s) shall be on-site, as determined by the consulting archaeologist, to perform periodic inspections of the excavations. The frequency of inspections will depend upon the rate of excavation, the materials excavated, and the presence and abundance of artifacts and features. The consulting archaeologist shall have the authority to modify the monitoring program if the potential for cultural resources appears to be less than anticipated.
5) Isolates and clearly non-significant deposits will be minimally documented in the field so the monitored grading can proceed. 6) In the event that previously unidentified cultural resources are discovered, the archaeologist shall have the authority to divert or temporarily halt ground disturbance operation in the area of discovery to allow for the evaluation of potentially significant cultural resources.

The archaeologist shall contact the lead agency at the time of discovery.

The archaeologist, in consultation with the lead agency, shall determine the significance of the discovered resources. The lead agency must concur with the evaluation before construction activities will be allowed to resume in the affected area. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the lead agency before being carried out using professional archaeological methods. If any human bones are discovered, the county coroner and lead agency shall be contacted. In the event that the remains are determined to be of Native American origin, the Most Likely Descendant (MLD), as identified by the NAHC, shall be contacted in order to determine proper treatment and disposition of the remains. 7) Before construction activities are allowed to resume in the affected area, the artifacts shall be recovered and features recorded using professional archaeological methods. The project archaeologist shall determine the amount of material to be recovered for an adequate artifact sample for analysis.
8) All cultural material collected during the grading monitoring program shall be processed and curated according to the current professional repository standards. The collections and associated records shall be transferred, including title, to an appropriate curation facility, to be accompanied by payment of the fees necessary for permanent curation.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 202 4

CULTURAL RESOURCES

ENPLANNERS

4.5-11
9) A report documenting the field and analysis results and interpreting the artifact and research data within the research context shall be completed and submitted to the satisfaction of the lead agency prior to the issuance of any building permits. The report will include DPR Primary and Archaeological Site Forms.

MM CUL-2: Human Remains - If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin.

Further, pursuant to Public Resource Code Section 5097.98(b), remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission (NAHC) shall be contacted within the period specified by law (24 hours). Subsequently, the NAHC shall identify the "most likely descendant." The most likely descendant shall then make recommendations and engage in consultation concerning the treatment of the remains as provided in Public Resources Code Section 5097.98.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CULTURAL RESOURCES

ENPLANNERS

4.5-12
This Page Intentionally Left Blank

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 2024
ENERGY

ENPLANNERS

4.6-1

4.6 ENERGY

4.6.1 INTRODUCTION
This section provides a summary of applicable impacts and mitigation measures identified in the 2001 EIR for the Approved Project, an overview of existing environmental conditions and regulatory requirements related to energy, and analyses of potential changes in impacts associated with energy consumption from implementation of the Modified Project in comparison to the Approved Project. Mitigation measures are recommended as necessary to reduce significant energy related impacts. No NOP comment letters, or Scoping Meeting comments were received pertaining to this topic.

This section of the Draft SEIR is based in part on the Green River Ranch Specific Plan Amendment, SP00-001 Amendment No.1, Energy Analysis, June 12, 2024, Urban Crossroads dated (Appendix G).

4.6.2 SUMMARY OF IMPACTS AND MITIGATION MEASURES FROM THE 2001 EIR
The following summarizes the determination from the 2001 EIR as it relates to energy impacts from the Approved Project.
a) Conflict with energy conservation plans?
As determined in the 2001 EIR, development of the Approved Project would not conflict with any adopted energy conservation plan by the City. Although the Approved Project would consume approximately 21,077 kilowatt hours of electricity per day, this was determined to be an insignificant amount of the electrical energy when compared to the amount of electricity supplied daily by Southern California Edison or of the energy consumption in the City. As a result, impacts were determined to be less than significant. b) Use of non-renewable resources?
Although energy in the form of fossil fuels and electricity would be utilized by construction vehicles and lighting during construction, post-construction, and occupancy use of the structures, the 2001 EIR determined construction of the Approved Project would not require use of large or wasteful amounts of fuel or energy. The use of energy to construct the Approved Project would be an irrevocable commitment of fossil fuel resources. However, the Approved Project would comply with the City's policies relevant to energy conservation, and would incorporate designs that include energy conservation features consistent with Uniform Building Code (UBC) standards and State Building Energy Efficiency Standards (under Title 24 of the California Administrative Code). Development of the Approved Project was not expected to use construction materials or energy in a wasteful or inefficient manner. As a result,

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1
ENERGY

ENPLANNERS

4.6-2
the 2001 EIR determined impacts from the approved Project’s use of non-renewable resources to be less than significant requiring no mitigation.

4.6.3 ENVIRONMENTAL SETTING
Due to the topography of the property, development has been limited to the northern portion of the GRRSP Planning Area. Previous on-site structures included two residential homes and horse boarding facilities (corrals, feed and tack storage containers, pasture, etc.) in the northern and flatter portions of the Project site south of Green River Road. Most of these structures and facilities have been removed after approval of the Approved Project. Currently, the GRRSP Planning Area is primarily undeveloped and vacant with the exception of drainage facilities installed within the hillside of the southeastern border of the site. As a result, the Planning Area does not consume energy.

Electricity
Electricity is a man-made resource. The production of electricity requires the consumption or conversion of renewable and non-renewable energy resources including water, wind, oil, gas, coal, solar, geothermal, and nuclear resources into energy. Electricity is used for a variety of purposes (e.g., lighting, heating, cooling, and refrigeration, and for operating appliances, computers, electronics, machinery, and public transportation systems).

The GRRSP Planning Area is within the service territory of Southern California Edison (SCE).

SCE provides electricity to more 15 million people, 180 incorporated cities, 15 counties, 5,000 large businesses, and 280,000 small businesses throughout its 50,000-square-mile service area.

According to the California Energy Commission (CEC), total electricity consumption in the SCE service area in 2022 was approximately 85,869 GWh. (31,603 GWh for the residential sector). Total electricity consumption in Riverside County in 2022 was 17,781 GWh (for residential and nonresidential sectors).

Natural Gas
Natural gas is a non-renewable fossil fuel. Natural gas is a combustible mixture of hydrocarbon compounds (primarily methane) that is used as a fuel source. Natural gas is found in naturally occurring reservoirs in deep underground rock formations. Natural gas is used for a variety of uses including heating buildings, generating electricity, and powering appliances such as stoves, washing machines and dryers, gas fireplaces, and gas grills.

The Southern California Gas Company (SoCalGas) is the natural gas service provider for the Project site. SoCalGas provides natural gas to approximately 21.8 million people in a 24,000 square-mile service area. According to the CEC, total natural gas consumption in the SoCalGas service area in 2022 was approximately 5,026 million therms (2,230 million therms for the residential sector). Total natural gas consumption in Riverside County in 2022 was approximately 431 million therms (284 million therms for the residential sector).

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 2024
ENERGY

ENPLANNERS

4.6-3
Petroleum Transportation Energy
Petroleum is also a non-renewable fossil fuel. According to the U.S. Energy Information Administration (EIA), gasoline is the most used transportation fuel in California, being consumed by passenger vehicles including light-duty cars, pickup trucks, and sport utility vehicles. According to the EIA, in 2021, total consumption of energy in California was 6,923 trillion British Thermal Units (BTU). In 2021, California consumed approximately 12,157 million gallons in motor gasoline (33.31 million per day) and approximately 3,541 million gallons of diesel fuel (9.7 million per day).

4.6.4 EXISTING REGULATIONS, PLANS, PROGRAMS, AND POLICIES

FEDERAL REGULATIONS
Intermodal Surface Transportation Efficiency Act Of 1991 (ISTEA) The ISTEA promoted the development of inter‐modal transportation systems to maximize mobility as well as address national and local interests in air quality and energy. ISTEA contained factors that Metropolitan Planning Organizations (MPOs) were to address in developing transportation plans and programs, including some energy‐related factors. To meet the new ISTEA requirements, MPOs adopted explicit policies defining the social, economic, energy, and environmental values guiding transportation decisions.

Transportation Equity Act for the 21st Century (TEA-21) The TEA‐21 was signed into law in 1998 and builds upon the initiatives established in the ISTEA legislation, discussed above. TEA‐21 authorizes highway, highway safety, transit, and other efficient surface transportation programs. TEA‐21 continues the program structure established for highways and transit under ISTEA, such as flexibility in the use of funds, emphasis on measures to improve the environment, and focus on a strong planning process as the foundation of good transportation decisions. TEA‐21 also provides for investment in research and its application to maximize the performance of the transportation system through, for example, deployment of Intelligent Transportation Systems, to help improve operations and management of transportation systems and vehicle safety.

STATE REGULATIONS
Integrated Energy Policy Report (IEPR)
Senate Bill 1389 (Bowen, Chapter 568, Statutes of 2002) requires the CEC to prepare a biennial integrated energy policy report that assesses major energy trends and issues facing the state’s electricity, natural gas, and transportation fuel sectors and provides policy recommendations to conserve resources; protect the environment; ensure reliable, secure, and diverse energy supplies; enhance the state’s economy; and protect public health and safety (Public Resources Code § 25301[a]). The CEC prepares these assessments and associated policy

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1
ENERGY

ENPLANNERS

4.6-4
recommendations every two years, with updates in alternate years, as part of the Integrated Energy Policy Report. The 2022 IEPR was adopted February 2023, and continues to work towards improving electricity, natural gas, and transportation fuel energy use in California.

The 2022 IEPR introduces a new framework for embedding equity and environmental justice at the CEC and the California Energy Planning Library which allows for easier access to energy data and analytics for a wide range of users. Additionally, energy reliability, western electricity integration, gasoline cost factors and price spikes, the role of hydrogen in California’s clean energy future, fossil gas transition and distributed energy resources are topics discussed within the 2022 IEPR.

State of California Energy Plan
The CEC is responsible for preparing the State Energy Plan, which identifies emerging trends related to energy supply, demand, conservation, public health and safety, and the maintenance of a healthy economy.

The Plan calls for the state to assist in the transformation of the transportation system to improve air quality, reduce congestion, and increase the efficient use of fuel supplies with the least environmental and energy costs. To further this policy, the plan identifies several strategies, including assistance to public agencies and fleet operators and encouragement of urban designs that reduce vehicle miles traveled (VMT) and accommodate pedestrian and bicycle access.

California Code Title 24, Part 6, Energy Efficiency Standards California Code of Regulations (CCR) Title 24 Part 6: The California Energy Code was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption.

The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on January 1, 2009, and is administered by the California Building Standards Commission. CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2022 California Green Building Code Standards that will be effective on January 1, 2023.

Local jurisdictions are permitted to adopt more stringent requirements, as state law provides methods for local enhancements. CALGreen recognizes that many jurisdictions have developed existing construction waste and demolition ordinances and defers to them as the ruling guidance provided, they establish a minimum 65% diversion requirement.

The code also provides exemptions for areas not served by construction waste and demolition recycling infrastructure. The State Building Code provides the minimum standard that

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 2024
ENERGY

ENPLANNERS

4.6-5
buildings must meet in order to be certified for occupancy, which is generally enforced by the local building official.

Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas (GHG) emissions. The 2022 version of Title 24 was adopted by the CEC and will be effective on January 1, 2023.

The 2022 Title 24 standards would result in less energy use, thereby reducing air pollutant emissions associated with energy consumption in the SCAB and across the State of California.

For example, the 2022 Title 24 standards require solar photovoltaic systems for new homes, encourage the use of heat pumps for space and water heating, and require homes to be electric ready to ease the adoption of cleaner electric heating, cooking, and EV charging. The CEC anticipates that the 2022 energy code will provide $1.5 billion in consumer benefits and reduce GHG emissions by 10 million metric tons (19). The Project would be required to comply with the applicable standards in place at the time building permit document submittals are made.

These require, among other items (20):

Residential Mandatory Measures
• Electric vehicle (EV) charging stations. New construction shall comply with Section

4.106.4.1, 4.106.4.2, 4.106.4.3, to facilitate future installation and use of EV chargers.

Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code, Article 625. (4.106.4).
o New one- and two-family dwellings and town-houses with attached private garages. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device.
o New hotels and motels. All newly constructed hotels and motels shall provide EV spaces capable of supporting future installation of EVSE. The construction documents shall identify the location of the EV spaces. The number of required EV spaces shall be based on the total number of parking spaces provided for all types of parking facilities in accordance with Table 4.106.4.3.1. • Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with Sections 4.303.1.1,

4.303.1.2, 4.303.1.3, and 4.303.1.4.

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1
ENERGY

ENPLANNERS

4.6-6
• Outdoor potable water use in landscape areas. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resource ‘Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent.
• Operation and maintenance manual. At the time of final inspection, a manual, compact disc, web-based reference or other media acceptable to the enforcing agency which includes all of the following shall be placed in the building:
o Directions to the owner or occupant that the manual shall remain with the building throughout the life cycle of the structure.
o Operations and maintenance instructions for the following:

1. Equipment and appliances, including water-saving devices and systems, HVAC systems, photovoltaic systems, EV chargers, water-heating systems and other major appliances and equipment.

2. Roof and yard drainage, including gutter and downspouts.

3. Space conditioning systems, including condensers and air filters.

4. Landscape irrigation systems.

5. Water reuse systems.
o Information from local utility, water and waste recovery providers on methods to future reduce resource consumption, including recycle programs and locations. o Public transportation and/or carpool options available in the area. o Educational material on the positive impacts of an interior relative humidity between 30-60% and what methods an occupants may use to maintain the relative humidity level in that range.
o Information about water-conserving landscape and irrigation design and controllers which conserve water.
o Instructions for maintaining gutters and downspouts and the importance of diverting water at least 5 feet away from the foundation. o Information about state solar energy and incentive programs available. o A copy of all special inspection verifications required by the enforcing agency of this code.
o Information from CALFIRE on maintenance of defensible space around residential structures.

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1

CITY OF CORONA
SEPTEMBER 2024
ENERGY

ENPLANNERS

4.6-7
• Any installed gas fireplace shall be direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with U.S. EPA New Source Performance Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified to meet the emission limits. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. • Paints and coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of the CARB Architectural Suggested Control Measure, as shown in Table

4.504.3, unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table

4.504.3 shall be determined by classifying the coating as a Flat, Nonflat, or Nonflathigh Gloss coating, based on its glass, as defined in subsections 4.21, 4.36, and 4.37 of the 2007 CARB, Suggested Control Measure, and the corresponding Flat, Nonflat, Nonflat-high Gloss VOC limit in Table 4.504.3 shall apply.

Nonresidential Mandatory Measures
• Short-term bicycle parking. If the new project or an additional alteration is anticipated to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors’ entrance, readily visible to passers-by, for 5% of new visitor motorized vehicle parking spaces being added, with a minimum of one two-bike capacity rack (5.106.4.1.1).
• Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more tenant-occupants, provide secure bicycle parking for 5% of the tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility (5.106.4.1.2). • Designated parking for clean air vehicles. In new projects or additions to alterations that add 10 or more vehicular parking spaces, provide designated parking for any combination of low-emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.2 (5.106.5.2).
• EV charging stations. New construction shall facilitate the future installation of EV supply equipment. The compliance requires empty raceways for future conduit and documentation that the electrical system has adequate capacity for the future load. The number of spaces to be provided for is contained in Table 5.106. 5.3.3 (5.106.5.3).

Additionally, Table 5.106.5.4.1 specifies requirements for the installation of raceway conduit and panel power requirements for medium- and heavy-duty electric vehicle supply equipment for warehouses, grocery stores, and retail stores. • Outdoor light pollution reduction. Outdoor lighting systems shall be designed to meet the backlight, uplight and glare ratings per Table 5.106.8 (5.106.8).

CITY OF CORONA
SEPTEMBER 2024

DRAFT SUBSEQUENT EIR

GREEN RIVER RANCH SPA & BUSINESS PARK

INDUSTRIAL DEVELOPMENT AND
RELOCATION OF PCL - 1
ENERGY

ENPLANNERS

4.6-8
• Construction waste management. Recycle and/or salvage for reuse a minimum of 65% of the nonhazardous construction and demolition waste in accordance with Section

5.408.1.1. 5.405.1.2, or 5.408.1.3; or meet a local construction and demolition waste management ordinance, whichever is more stringent (5.408.1). • Excavated soil and land clearing debris. 100% of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reuse or recycled.

For a phased project, such material may be stockpiled on site until the storage site is developed (5.408.3).
• Recycling by Occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage, and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals or meet a lawfully enacted local recycling ordinance, if more restrictive (5.410.1).
• Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following:
o Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush (5.303.3.1)
o Urinals. The effective flush volume of wall-mounted urinals shall not exceed 0.125 gallons per flush (5.303.3.2.1). The effective flush volume of floor- mounted or other urinals shall not exceed 0.5 gallons per flush (5.303.3.2.2). o Showerheads. Single showerheads shall have a minimum flow rate of not more than

1.8 gallons per minute and 80 psi (5.303.3.3.1). When a shower is served by more than one showerhead, the combine flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi (5.303.3.3.2).
o Faucets and fountains. Nonresidential lavatory faucets shall have a maximum flow rate of not more than 0.5 gallons per minute at 60 psi (5.303.3.4.1). Kitchen faucets shall have a maximum flow rate of not more than 1.8 gallons per minute of 60 psi (5.303.3.4.2). Wash fountains shall have a maximum flow rate of not more than 1.8 gallons per minute (5.303.3.4.3). Metering faucets shall not deliver more than 0.20 gallons per cycle (5.303.3.4.4). Metering faucets for wash fountains shall have a maximum flow rate not more than 0.20 gallons per cycle (5.303.3.4.5). • Outdoor potable water uses in landscaped areas. Nonresidential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources’ Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent (5.304.1).