Section 4. EXECUTIVE AND EXEMPT CLASSIFICATIONS
A. Unclassified/EXECUTIVE Classifications
The following classifications are Unclassified/EXECUTIVE (FLSA Exempt):
Assistant City Manager
City Clerk
City Manager
Deputy City Manager
All Department Directors
B. Classified/EXEMPT Classifications
The following full-time classifications are Classified/FLSA Exempt:
Accountant Management Analyst
Assistant to the City Manager Police Captain
Assistant Director of Public Services & Engineering Police Community Relations Coordinator Associate Architect Police Lieutenant
Aquatics Supervisor Police Support Services Manager
Associate Engineer Principal Architect
Associate Planner Principal Engineer
Beach Lifeguard Captain Principal Librarian
Building Official Principal Planner
Communications and Engagement Officer Public Services & Engineering Admin Mgr Deputy City Clerk Public Services Manager
Finance Manager Recreation Services Supervisor
Fire Division Chief Senior Accountant
Emergency Management Coordinator Senior Engineer
Golf Superintendent Senior Librarian
Human Resources and Risk Manager Senior Management Analyst Human Resources Analyst Senior Planner
Information Technology Applications Manager Senior Human Resources Analyst Information Technology Infrastructure Manager Utility Manager Library Services Analyst Utility Supervisor
Section 5. CLASSIFICATIONS REPRESENTED BY EMPLOYEE ASSOCIATIONS (listed by Association)
A. The following classifications are represented by the AMERICAN FEDERATION OF STATE, COUNTY AND MUNICIPAL EMPLOYEES LOCAL 127
(AFSCME):
Electrician Mechanic I
Engineering Technician II Mechanic II
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 272
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
Heavy Equipment Operator Mechanic III
Lead Maintenance Worker Motor Sweeper Operator
Lead Pump Mechanic Special Equipment Mechanic I
Maintenance Worker I Special Equipment Mechanic II
Maintenance Worker II Utility Systems Operator I
Maintenance Worker III Utility Systems Operator II
Master Mechanic Utility Systems Operator III
B. The following classifications are represented by the CORONADO FIREFIGHTERS’ ASSOCIATION (CFA):
Firefighter Firefighter/Paramedic
Fire Captain Fire Engineer
C. The following classifications are represented by the CORONADO POLICE OFFICERS’ ASSOCIATION (CPOA):
Evidence & Property Technician Police Officer
Police Corporal Police Sergeant
Police Dispatcher Police Services Officer I
Police Dispatch Supervisor Police Services Officer II
Section 6. SELF-REPRESENTED CLASSIFICATIONS
SELF-REPRESENTED classifications are those regular full-time and regular part-time positions (defined as employees who work a fixed schedule greater than twenty (20) hours but fewer than forty (40) hours per week and identified in the Annual Budget as regular part-time), which are not classified as Executive and are not represented by an Association.
The following classifications are SELF-REPRESENTED:
Accountant Information Technology Technician
Accounting Technician I Lead Police Records Specialist
Administrative Secretary Librarian II
Aquatics Coordinator Library Assistant II
Aquatics Supervisor Library Assistant III
Assistant Director of Public Services & Eng Library Services Analyst Assistant Engineer Library Technician
Assistant Planner Management Analyst
Assistant to the City Manager Management Assistant
Associate Architect Marketing Assistant
Associate Engineer Payroll Specialist
Associate Human Resources Analyst Police Captain
Associate Information Technology Analyst Police Com. Relations Coord.
Associate Planner Police Lieutenant
Beach Lifeguard Police Officer Recruit
Beach Lifeguard Captain Police Records Specialist
Beach Lifeguard Sergeant Police Support Services Manager Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 273
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
Building Inspector I Principal Architect
Building Inspector II Principal Engineer
Building Official Principal Librarian
Communications and Engagement Officer Principal Planner Community Development Technician Public Services & Engineering Admin Mgr Department Administrative Assistant Public Services Manager Department Administrative Coordinator Recreation Coordinator Deputy City Clerk Recreation Services Supervisor
Executive Assistant to the City Manager Senior Accountant Executive Assistant to the Police Chief Senior Human Resources Analyst Finance Manager Senior Information Technology Analyst
Fire Division Chief Senior Accounting Technician
Fire Prevention Aide Senior Engineer
Golf Superintendent Senior Librarian
Human Resources Analyst Senior Management Analyst
Human Resources and Risk Manager Senior Planner
Information Technology Analyst Utility Manager
Information Technology Applications Manager Utility Supervisor Information Technology Infrastructure Manager
Section 7. TEMPORARY PART-TIME AND SEASONAL CLASSIFICATIONS (Non-Benefited) A. TEMPORARY PART-TIME AND SEASONAL positions do not work regularly scheduled hours. These positions are non-regular, do not accrue benefits, and are exempt from provisions of the Civil Service Rules per Civil Service Rule II:
Classification of Positions, Section 4, Page 4.
B. The following classifications and/or any other classifications listed in Section 3, Section 4, Section 5, and Section 6 may be utilized when hiring TEMPORARY PART-TIME positions:
Administrative Intern Lifeguard Assistant (Beach)
Beach Lifeguard Pool Lifeguard I/II/III
Beach Lifeguard Trainee Recreation Assistant
Emergency Medical Technician Recreation Leader
Librarian I Recreation Specialist
Library Assistant I Seasonal Maintenance Assistant I
Library Monitor Seasonal Maintenance Assistant II
Library Page
C. The salary range steps for all classifications will keep pace with the established California minimum wage rate. The California minimum wage may change after the publication of the Personnel Authorization and Compensation Plan Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 274
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
and any steps below the minimum wage for all TEMPORARY PART-TIME AND SEASONAL classifications will be adjusted accordingly on the next revision.
Section 8. EXCEEDING AUTHORIZED NUMBER OF POSITIONS FOR A CLASSIFICATION Departments shall be allowed to exceed the authorized number of positions in a classification for up to two (2) weeks to enable an employee who is vacating a position to participate in the training of his/her replacement. Longer periods of overlap may be approved by the City Manager.
Section 9. SALARIES
A. All employees, except City Manager and Unclassified Executive employees, shall receive salaries as shown in Section 1.
B. The salaries for all Unclassified Executive Employees are set by the City Manager within the salary ranges as shown in Section 2A.
C. The City Manager’s salary is set by the City Council and is shown in Section 2A.
Section 10. RETIREMENT
A. BENEFIT FORMULAS
1. The City shall provide retirement benefits through the California Public Employees’ Retirement System (CalPERS) to all classified regular full-time and part-time and all unclassified EXECUTIVE employees.
2. For all public safety employees (sworn police and fire positions) hired prior to January 1, 2013, and for all public safety employees who meet the definition of a “classic” member as determined by CalPERS, the City will provide the “3% at 50” retirement benefit formula.
In compliance with the Public Employee Pension Reform Act of 2012, for all public safety employees (sworn police and fire positions) hired after January 1, 2013, who do not meet the CalPERS definition of a “classic” member, the City will provide the “2.7% at 57” retirement benefit formula.
3. For all miscellaneous, non-safety (non-sworn) employees hired prior to January 1, 2013, and for all miscellaneous, non-safety employees who meet the definition of a “classic” member as determined by CalPERS, the City will provide the “3% at 60” retirement benefit formula.
In compliance with the Public Employee Pension Reform Act of 2012, for all miscellaneous, non-safety (non-sworn) employees hired after January 1, 2013, who do not meet the CalPERS definition of a “classic” member, the City will provide the “2% at 62” retirement benefit formula.
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 275
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
B. EMPLOYEE MEMBER CONTRIBUTION
1. All City employees shall be responsible for paying their respective required CalPERS member contribution. For employees who are not classified as “classic” members, the CalPERS member contribution will be determined annually based on the CalPERS actuarial.
2. Effective July 6, 2019, the CalPERS contribution rate for all classic miscellaneous, non-safety members will be 9.5% (previously 8%), and 10.5% for all classic safety members (previously 9%). The formula for new members, enrolled in CalPERS on or after January 1, 2013, is 2% at 62 with a required employee contribution of 7.50%.
C. EMPLOYER CONTRIBUTION (ALL CATEGORIES)
The City will pay the actuarially determined CalPERS employer contribution for all regular positions.
Section 11. LEAVE
A. ADMINISTRATIVE LEAVE
1. Administrative Leave is in lieu of overtime and compensatory time as authorized by the City Manager.
2. Unclassified EXECUTIVE positions and those classified as FLSA/EXEMPT POLICE CAPTAIN shall receive eighty (80) hours of Administrative Leave.
3. Those positions classified as FLSA/EXEMPT, excluding FIRE DIVISION CHIEFS, shall receive sixty (60) hours of Administrative Leave.
4. Administrative Leave is accrued on July 1 and is to be used in the fiscal year in which it is earned in accordance with Civil Service Rule VI, Holidays and Leaves, Section 17. It has no cash value. Unused Administrative Leave shall expire on June 30.
5. Eligible employees hired after July 1 of a fiscal year will receive a pro-rated credit.
B. ANNUAL LEAVE (in lieu of sick leave and vacation)
1. All SELF-REPRESENTED employees shall accrue annual leave on a biweekly basis as follows (which includes both employment with Coronado and lateral service credit, as applicable):
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 276
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
LEAVE ACCRUAL TIER
(YEARS OF SERVICE)
HOURS PER
YEAR
0-5 144
>5-10 192
>10-20 216
>20 232
Maximum accumulation is 480 hours.
Employees working a 56-hour work week shall earn annual leave based on the hours per year shown above, converted using a multiplier of 1.4.
2. Effective July 1, 2018, POLICE LIEUTENANT and POLICE CAPTAIN classifications, similar to sworn law enforcement employees represented by the CORONADO POLICE OFFICERS’ ASSOCIATION will receive annual leave accruals based on years of full-time sworn law enforcement experience including service time spent with other agencies.
3. SELF-REPRESENTED NON-EXEMPT and EXEMPT EMPLOYEES may convert the following annual leave to cash each fiscal year based on their leave accrual tier (which includes both employment with Coronado and lateral service credit, as applicable) :
MAX CONVERSION (HOURS)
LEAVE ACCRUAL TIER
(YEARS OF SERVICE)
SELF-REPRESENTED
EMPLOYEES
0 - 5 80
>5 - 10 120
>10 - 20 160
>20 176
The City Manager may convert up to one-hundred and seventy-six (176) hours of annual leave to cash each fiscal year.
4. Unclassified EXECUTIVES shall accrue annual leave on a biweekly basis as follows and be allowed to convert annual leave to cash each fiscal year based on their leave accrual tier (which includes both employment with Coronado and lateral service credit, as applicable):
LEAVE ACCRUAL TIER
(YEARS OF SERVICE)
HOURS
PER YEAR
MAX CONVERSION
(HOURS)
0-5 184 120
6+ 224 176
Maximum accumulation is 480 hours.
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 277
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
5. SELF-REPRESENTED and unclassified EXECUTIVE employees are eligible to receive Lateral Service Credit. Benefitted full- and part-time employees hired with prior public sector experience may receive credit for prior service through annual leave accrual rates for their years of service with other public agencies.
Public sector experience is defined as employment in a city, county, state, federal government, or special district. This does not include military service time. Prior service applies to benefited full-time and part-time regular positions. Employees must submit proof of prior service time within 30 days of appointment for time to be recognized. New leave accruals will be effective the pay period following the date of prior service documentation submission.
6. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA Leave.
C. SICK LEAVE
1. Temporary Part-Time and Seasonal Employees employed on or after July 1, 2015, and who work for 30 or more days within a year, and who do not accrue other paid leaves, will accrue paid sick leave in compliance with the Healthy Workplace, Healthy Families Act of 2014. Leave will accrue at a rate of one hour for every 30 hours worked, beginning on the first day of employment or July 1, 2015, whichever is later. Subject to limitations, a Temporary Part-Time or Seasonal employee may use sick leave only after the 90th day of employment and up to 40 hours in one calendar year. Upon separation of employment or appointment to a probationary/permanent position, any unused sick leave will be cashed out at the current rate of pay.
2. Refer to the respective CFA MOU for specific details on Sick Leave.
D. BEREAVEMENT LEAVE
1. Unclassified EXECUTIVE and SELF-REPRESENTED employees shall receive up to five (5) work days of leave without loss of base pay or deductions from other leave balances in order to attend customary obligations arising from the death of a relative who is a member of the employee’s immediate family.
2. The “immediate family” shall be defined as: spouse, domestic partner, child, parent, sibling, grandparent, grandchild; the aforementioned, either natural, legally adopted, step, or in-law, or any person over whom the employee acts as legal guardian; or similar relationships as determined by the City Manager or designee.
Section 12. HEALTH/CAFETERIA BENEFIT PLAN
A. The annual allotment for calendar year 2025 and 2026 for the Health/Cafeteria Benefit Plan for SELF-REPRESENTED employees, employees represented by the CORONADO FIREFIGHTERS’ ASSOCIATION, CORONADO POLICE
OFFICERS’ ASSOCIATION, and the AMERICAN FEDERATION OF STATE, COUNTY AND MUNICIPAL EMPLOYEES LOCAL 127 shall be as follows:
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 278
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
January 1 – December 31, 2026: Cafeteria allotment is dependent on medical plan enrollment.
Medical Enrollment Tier 2026 Monthly Cafeteria Allotment Employee + Family $2,298
Employee + 1 $2,068
Employee Only or Waive $1,379
B. The annual allotment for the Health/Cafeteria Benefit Plan for EXECUTIVE employees and ELECTED OFFICIALS shall be as follows:
January 1 – December 31, 2026: Cafeteria allotment is dependent on medical plan enrollment.
Medical Enrollment Tier 2026 Monthly Cafeteria Allotment Employee + Family $2,608
Employee + 1 $2,347
Employee Only or Waive $1,565
C. The annual allotment for the Health/Cafeteria Benefit Plan for retired employees participating in CalPERS health plans shall be as follows:
January 1 – December 31, 2026: $162/month
D. The Health/Cafeteria Benefit Plan allotment is prorated on a calendar-year basis.
Section 13. TUITION REIMBURSEMENT
A. SELF-REPRESENTED and unclassified EXECUTIVE employees are eligible to receive $2,000 per year for both college classes leading to a degree and non-graded classes or short-term seminars that benefit the employee in the performance of city work upon written verification of satisfactory coursework completion, per Administrative Procedure 131. Additionally, SELF-REPRESENTED and unclassified EXECUTIVE employees are able to utilize this benefit for student loans. Reimbursement may be requested, up to the annual maximum as specified in the approved salary resolution, for any eligible unreimbursed expenses incurred on or after July 1 of the current fiscal year.
B. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA Tuition Reimbursement.
Section 14. HOLIDAYS
A. Unclassified EXECUTIVE and SELF-REPRESENTED employees, excluding FIRE DIVISION CHIEFS, receive twelve (12) paid holidays per year.
B. Unclassified EXECUTIVE and SELF-REPRESENTED employees, excluding Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 279
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
FIRE DIVISION CHIEFS, are given eighteen (18) hours credit on July 1 of each year for Lincoln’s Birthday and Farmworkers Day to be used as FLOATING HOLIDAYS. In order to accrue this time, an employee must be employed by the City within the pay period including July 1 of the fiscal year.
C. FIRE DIVISION CHIEFS are given twenty-two and a half (22.5) hours of credit on July 1 of each year in recognition of Lincoln’s Birthday and Farmworkers Day to be used as a FLOATING HOLIDAY. In order to accrue this time, an employee must be employed by the City within the pay period including July 1 of the fiscal year.
D. FIRE DIVISION CHIEFS who are assigned to and work on a twenty-four (24) hour shift basis shall be paid a holiday premium of ½ their regular rate of pay for all hours worked on a holiday. FIRE DIVISION CHIEFS who are on a forty (40) hour assignment and have a regularly scheduled workday fall on a recognized holiday for SELF-REPRESENTED employees, shall receive eight (8) hours of paid holiday leave.
E. Unclassified EXECUTIVE and SELF-REPRESENTED employees, excluding FIRE DIVISION CHIEFS, whose normal day off falls on a holiday will receive a FLOATING HOLIDAY, the quantity being determined by an employee’s typical workweek: Employees working a 40-hour (or more) workweek will receive 8 hours, those working a 30-hour workweek will receive 6 hours, and those working a 20-hour workweek will receive 4 hours. The FLOATING HOLIDAY hours will be added to their leave bank in lieu of time off. If a non-exempt employee is required to work on a holiday, time worked will be paid at the rate of one and one-half times the forty (40) hour work week rate.
F. All FLOATING HOLIDAY leave time must be used in the fiscal year in which it is accrued. Employees who terminate on or before June 30 will be paid straighttime for every hour of unused floating holiday leave time.
G. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA Holidays.
Section 15. OVERTIME
A. All earned overtime shall be payable in overtime wages or Compensatory Time Off (CTO), except as limited by FLSA and on CTO accrual and usage limits described below.
B. The City has established a twenty-eight (28) day, 212 hour work period for FIRE DIVISION CHIEFS. Any hours worked in excess of this schedule shall be paid at straight-time. DIVISION CHIEFS will be compensated portal to portal when assigned to strike team or pre-positioned emergency response, consistent with other fire personnel and where the City is reimbursed for its participation.
C. Any non-exempt SELF-REPRESENTED employees shall receive one and one-half times the regular rate of pay for overtime worked in excess of 40 hours in a week.
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 280
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
During any work cycle in which an employee has paid annual leave, comp time off, scheduled holiday, or floating holiday, said leave hours will be counted as work hours for the purpose of calculating entitlement to overtime during any work cycle.
D. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA Overtime and CTO as applicable.
Section 16. USE AND ACCRUAL OF COMPENSATORY TIME
A. SELF-REPRESENTED employees may not accumulate in excess of two hundred and forty (240) hours of compensatory time.
B. Prior to an appointment to a position in an EXEMPT classification, a non-exempt employee shall be paid for any accrued compensatory time earned.
Section 17. CERTIFICATION PAY
A. Employees in the permanent/probationary Beach Lifeguard classification who possess an Medical Response/First Aid/CPR Instructor Certification are eligible to receive 1.5% of their base salary in certification pay.
B. Employees in the Beach Lifeguard Sergeant or permanent/probationary Beach Lifeguard classifications who possess a Rescue Boat Operator certification and have successfully completed the Field Training Guide for Rescue Boat Operations are eligible to receive 2.5% of their base salary in certification pay.
C. FIRE DIVISION CHIEFS who posses a Paramedic License are eligible to receive
2.0% of their base salary in certification pay.
D. Employees in the Assistant Engineer or Associate Engineer classification who posses a Professional Civil Engineer license in the State of California are eligible to receive 5% of their base salary in certification pay.
E. SELF-REPRESENTED employees in the Recreation Department who posses a California Commerical Drivers’ License are eligible to receive thirty dollars ($30) per pay period in certification pay.
Section 18. BILINGUAL PAY
A. Bilingual pay will be provided to employees in administrative classifications that are required to use bilingual skills to meet the needs of the public. Bilingual skills must be used in the course of work and approved by the appointing authority. In order to receive bilingual pay, employees must successfully pass a bilingual fluency examination. Once designated, eligible employees shall receive sixty-five cents ($0.65) per hour worked.
B. Refer to respective MOUs for specific details on CPOA, and CFA Bilingual Pay.
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 281
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
Section 19. SPECIAL PROJECT PREMIUM PAY
A. Information Technology Analysts will receive an additional $35 per day of special project pay during the time that they are assigned to be on call and are available for work.
B. Aquatics Coordinators, Aquatics Supervisors, Recreation Department Administrative Coordinator, Recreation Services Supervisors, Recreation Coordinators, and Senior Management Analysts, will receive an additional $35 per day of special project pay during the time that they are assigned to be on call and are available for work.
Section 20. OUT-OF-CLASS ASSIGNMENTS
A. SELF-REPRESENTED employees shall be compensated for out-of-class assignments when temporarily assigned to the same higher-level class for more than 80 consecutive working hours. Higher level class is defined as a class with a higher salary range. Employees who meet this criterion shall be compensated by an additional five (5) percent of base salary for each consecutive hour worked in the out-of-class assignment from the 81st hour to the end of the out-of-class assignment.
B. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA Outof-Class Assignments.
Section 21. UNIFORM, CLOTHING AND SAFETY EQUIPMENT
A. The POLICE CHIEF, POLICE CAPTAIN, and POLICE LIEUTENANT classifications will receive a uniform allowance of $1,250 per year.
B. The FIRE CHIEF and FIRE DIVISION CHIEF classifications will receive a uniform allowance of $1,225 per year.
C. Employees represented by the AMERICAN FEDERATION OF STATE, COUNTY AND MUNICIPAL EMPLOYEES LOCAL 127 will be required to wear and maintain in presentable fashion City provided work clothes. The City will report to CalPERS the monetary value for providing and maintaining the employees’ required uniforms. The city will report the uniform allowance on an annual basis to CalPERS in June of each year. The uniform allowance amount reported to CalPERS will derive from the City’s total fiscal year expended amount for providing and maintaining the employees’ uniforms, not to exceed $300 per year, per employee.
D. Refer to respective MOUs for specific details on AFSCME, CPOA, and CFA uniform, clothing, and safety equipment.
Section 22. CITY PAID LIFE INSURANCE
A. All SELF-REPRESENTED and CORONADO FIREFIGHTERS’ ASSOCIATION Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 282
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
employees shall receive City paid group term life and Accidental Death and Dismemberment (AD&D) insurance in an amount equal to one times annual salary or $50,000, whichever is greater.
B. All AMERICAN FEDERATION OF STATE, COUNTY, AND MUNICIPAL EMPLOYEES LOCAL 127 and CORONADO POLICE OFFICERS’
ASSOCIATION employees shall receive City paid group term life and AD&D insurance equal to $25,000.
C. All unclassified EXECUTIVE employees shall receive City paid group term life and AD&D insurance in an amount equal to one times annual salary plus $25,000.
D. The City Manager shall receive City paid group term life and AD&D insurance equal to $400,000.
Section 23. CITY PAID SHORT-TERM DISABILITY INSURANCE
Unclassified EXECUTIVE, SELF REPRESENTED employees, employees represented by the AMERICAN FEDERATION OF STATE, COUNTY AND MUNICIPAL
EMPLOYEES LOCAL 127 and all NON-SWORN employees in the CORONADO POLICE OFFICERS’ ASSOCIATION shall receive City paid group short-term disability insurance for a maximum period of twelve (12) weeks.
Section 24. CITY PAID LONG-TERM DISABILITY INSURANCE
Unclassified EXECUTIVE, SELF-REPRESENTED employees, employees represented by the AMERICAN FEDERATION OF STATE, COUNTY AND MUNICIPAL
EMPLOYEES LOCAL 127 and all NON-SWORN employees in the CORONADO POLICE OFFICERS’ ASSOCIATION shall receive City paid long-term disability insurance at 66 2/3% of the first $5,000 of monthly earnings to normal retirement age as defined by the policy.
Section 25. EDUCATIONAL INCENTIVES
Employees in the classifications of POLICE LIEUTENANT and POLICE CAPTAIN holding an Advanced P.O.S.T Certificate shall receive an educational incentive pay of 10% of base pay per pay period.
Section 26. LONGEVITY PAY
SELF-REPRESENTED and unclassified EXECUTIVE employees are eligible to receive longevity pay in recognition of their years of uninterrupted service to the City. Longevity pay will be issued as a one-time lump payment paid on the closest pay period following the employee’s anniversary date. Longevity pay is not cumulative. • Employees who have five (5) years of uninterrupted service with the City will receive $1,000.
• Employees who have ten (10) years of uninterrupted service with the City will receive Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 283
Personnel Authorization and Compensation Plan
Fiscal Year 2026-27
Amended July 21, 2026
Sections 4 through 30
$1,500.
• Employees who have fifteen (15) years of uninterrupted service with the City will receive $2,000.
• Employees who have twenty (20) years of uninterrupted service with the City will receive $2,500.
• Employees who have twenty-five (25) years of uninterrupted service with the City will receive $3,000.
• Employees will receive $3,000 for every additional five (5) years of uninterrupted employment with the City thereafter.
Section 27. ROUNDING OF SALARIES
All salaries shown in Sections 1 and 2 have been rounded to the nearest two (2) decimal places. Payroll calculations are made to four (4) decimal places.
Section 28. “Z” RATED SALARIES
A. The “Z” rate for any classification is hereby defined as any rate of pay for a specific salary step in excess of the corresponding step of the regular range for the class. An employee shall be paid the “Z” rate solely under one of the following two conditions:
1. Upon the reduction of the salary range for a class, an employee having other than provisional status who, immediately prior to the reduction of the salary range, was paid at a higher rate forsuch class, than the new maximum rate shall, in the absence of any contrary orders by the City Council for economic reasons, continue to be paid at the former rate.
2. Any employee whose position is reallocated from a class in which the employee has acquired permanent status to a class with a lower range shall, in the absence of any contrary orders by the City Council for economic reasons, continue to be paid at the former rate.
B. In the event an across-the-board salary increase is granted to a class held by an employee being paid at the “Z” rate, the employee shall receive the across-the-board increase. Once a position held by a “Z” rated employee is vacated, the position shall be paid at the regular rate.
Section 29. VEHICLE ALLOWANCE
EXECUTIVE positions identified by the City Manager shall receive an auto allowance of up to $350.00 per month.
Section 30. CONFLICT WITH CIVIL SERVICES RULES AND MEMORANDA OF
UNDERSTANDING
In case of conflict, this Compensation Plan supersedes Civil Service Rules. Memoranda of Understandings contain additional detail and supersede this Compensation Plan if there is conflict.
Resolution 2026-49
Exhibit A
Item 4.h
July 21, 2026 City of Coronado Page 284
CITY COUNCIL STAFF REPORT
Authorize the City Manager to Award Contracts and Change Orders for the Street Preventative Maintenance - Zone 2 and 3 Project and Associated Support Services in the Amount of $1,661,180.95; Authorize an Additional Appropriation of $261,300 from the Highway Users Tax Account (HUTA) Fund
RECOMMENDATION
1. Find that the project is categorically exempt from environmental review under Class 1 of the state CEQA Guidelines section 15301, Existing Facilities;
2. Authorize City Manager to Award a Contract to Pavement Coatings, Co. for $1,299,889.75 for the Construction of the Street Preventative Maintenance Project - Zone 2 and 3 Project (Contract No. 26-CO-EN-1139);
3. Authorize the City Manager to Award Task Orders in a form approved by the City Attorney for Associated Support Services to (1) Reddy Engineering for Construction Management support services ($183,208); (2) Ninyo and Moore for Testing and Inspection Services ($48,083.20);
4. Appropriate an Additional $261,300 from HUTA fund 202; and
5. Authorize the City Manager to execute Change Orders within the project budget.
BACKGROUND
The Street Preventative Maintenance project is part of an ongoing maintenance program designed to extend the life of asphalt roadways by applying a slurry seal, a thin (approximately one-eighth of an inch thick) layer of sand and emulsified asphalt mixture that rejuvenates the existing asphalt surface. Every fiscal year, approximately one-seventh of Coronado’s streets and parking lots are rehabilitated by removing old roadway striping and pavement markings, filling cracks wider than a quarter inch, applying a Type I slurry seal, and repainting roadway striping and markings.
The project, formerly the Street Preventative Maintenance Fiscal Year (FY) 2025-26, was renamed “Street Preventative Maintenance – Zone 2 and 3”, as part of the FY 2026-27 Capital Improvement Program (CIP). It will apply a slurry seal to two of seven zones throughout the city. Zone 2 will slurry seal all public streets within the Coronado Cays community while Zone 3 will slurry (generally) all of the City’s public roadways north of Fourth Street. This totals approximately 2,911,355 square feet of slurry seal.
Additionally, approximately 28,134 square feet of asphalt “dig out” repairs will be completed. Asphalt repairs require full depth removal of asphalt material to existing subgrade (or a minimum of 6 in depth) preparation of subgrade as needed, and installation of new asphalt. Asphalt repairs will range in size between a minimum of 4 feet by 4 feet and a maximum of 30 feet by 160 feet at various locations throughout the project area.
A map of the areas included in this preventative maintenance project is included in Attachment 1. No new pavement markings were identified for this area in the City’s Active Transportation Plan or recommended by staff.
ANALYSIS
The project was advertised on May 29, 2026, via PlanetBids. Bids were publicly received and “opened” on-line through Planet Bids on June 26, 2026, with the following results:
Item 4.i
July 21, 2026 City of Coronado Page 285
Bidder Base Project Bid Plus
Additive
Pavement Coatings, Co. $1,299,889.75
American Asphalt South, Inc. $1,382,275.18
Roy Allan Slurry Seal, Inc. $1,497,163.58
Union Pavement Services, Inc. $1,498,777.80
RGC General Engineering, Inc. $1,671,095.07
J&S Asphalt, Inc. $1,714,841.68
Staff reviewed the bid package, insurance, and bonding for Pavement Coatings, Co. In accordance with the Standard Specifications for Public Works Construction, Pavement Coatings, Co. was determined to be the lowest responsible and responsive bidder. Public contracting laws require the City to award the contract to the lowest responsible and responsive bidder, which, in this case, is Pavement Coatings, Co. (Attachment 2). While sufficient resources are available in the project budget to cover the cost of the construction contract, additional funds are required to cover construction inspection, management, and contingency related costs.
Due to the size of the project and limitations of staff availability, it is recommended that a Task Order be issued to Reddy Engineering, one of the City’s on-call construction management consultants, to provide day-to-day construction management and inspection services for the project. The proposal for the proposed Task Order provided as Attachment 3. A Task Order for Geotechnical Engineering (Ninyo and Moore) is also anticipated to be executed for the project as is typical for this type of project to allow for geotechnical inspection of construction activities and material testing, and response to any geotechnical questions from the contractor regarding the project design. The proposal for the proposed Task Order is provided as Attachment 4.
FISCAL IMPACT
The Street Preventative Maintenance Annual Program was initially approved as part of the FY 2025-26 CIP with a project budget of $1,400,000, comprised of $750,000 in TransNet funds and $650,000 in HUTA funds. To date, no funds have been spent as the construction documents were prepared by staff.
An additional appropriation of $261,300 from HUTA fund 202 will be required to complete the project.
Currently, the HUTA fund balance is $371,525. If the additional appropriation is approved, the estimate fund balance on June 30, 2027, will be $110,225.
It is recommended that the project be funded as follows:
Project Budget
TransNet Fund $750,000.00
HUTA Fund $650,000.00
(Less) Expenses to Date ($0.00)
Total Remaining Budget $1,400,000.00
Construction Contract Award ($1,299,889.75)
Project Contingency (~10%) ($130,000.00)
Materials Testing (~4%) ($48,083.20)
Construction Management (~15%) ($183,208.00)
Total Project Cost Estimate $1,661,180.95
Estimated Project Balance -$261,180.95
Additional Appropriation Required
(HUTA Fund 202) $261,300.00
ALTERNATIVE
The Council may elect to reject all bids and provide alternate direction.
Item 4.i
July 21, 2026 City of Coronado Page 286
CALIFORNIA ENVIRONMENTAL QUALITY ACT
Categorically exempt from environmental review under Class 1 of the state CEQA Guidelines section 15301, Existing Facilities.
PUBLIC NOTICE
No public notice is required for this item.
ATTACHMENTS
1. Project Scope and Location Map
2. Pavement Coatings, Co. Contract
3. Reddy Engineering, Inc. Proposal
4. Ninyo and Moore Proposal
Submitted By: Public Services and Engineering / Adriel Lara Item 4.i
July 21, 2026 City of Coronado Page 287
65 Contract No. 26-CO-EN-1139
ACA Approved Template (10-11-21) SD #4821-4737-7394 v1r ZONE 2 – CORONADO CAYS SLURRY LIMITS
DETAIL A: CAYS ENTRANCE
DETAIL B: PARKING LOT
Attachment 1
Item 4.i
July 21, 2026 City of Coronado Page 288
66 Contract No. 26-CO-EN-1139
ACA Approved Template (10-11-21) SD #4821-4737-7394 v1r ZONE 2 – JAMAICA VILLAGE RD PARKING LOT STRIPING
Item 4.i
July 21, 2026 City of Coronado Page 289
68 Contract No. 26-CO-EN-1139
ACA Approved Template (10-11-21) SD #4821-4737-7394 v1r ZONE 3 – CORONADO VILLAGE SLURRY LIMITS
DETAIL A: BRADLEY FIELD PARKING LOT
Item 4.i
July 21, 2026 City of Coronado Page 290
70 Contract No. 26-CO-EN-1139
ACA Approved Template (10-11-21) SD #4821-4737-7394 v1r
DIG OUT LOCATIONS
322 20 10 200 1201 First Street
323 3 3 9 1201 First Street
324 41 5 205 1201 First Street
325 25 3 75 1201 First Street
326 7 7 49 1201 First Street
327 10 3 30 1134 First Street
328 45 6 270 1003 First Street
329 28 3 84 1003 First Street
330 25 25 625 1003 First Street
331 17 4 68 1005 First Street
332 48 10 480 925 First Street
333 5 4 20 909 First Street
334 5 4 20 815 First Street
336 4 4 16 Alameda Blvd And Palm Ave
337 22 7 154 Alameda Blvd
339 7 6 42 Alameda Blvd
340 7 6 42 Alameda Blvd
341 8 7 56 Alameda Blvd
342 7 7 49 229Alameda Blvd
343 4 4 16 211Alameda Blvd
392 21 7 147 1515 Second Street
393 20 15 300 299 Glorietta Blvd
394 8 8 64 354 Glorietta Blvd
395 4 4 16 3040 Glorietta Pl
396 7 6 42 1424 Second Street
397 20 6 120 Second Street And A Ave
398 25 8 200 1322 Second Street
399 70 8 560 1322 Second Street
347 40 6 240 326 J Ave
350 44 4 176 600 H Ave
355 17 5 85 600 H Ave
358 7 4 28 363 G Ave
361 45 10 450 200 G Ave
362 12 10 120 724 F Ave
367 10 10 100 345 F Ave
370 36 10 360 900 E Ave
374 45 3 135 171 C Ave
375 45 5 225 200 C Ave
377 28 5 140 205 Orange Ave
378 45 3 135 205 B Ave
379 45 7 315 202 B Ave
380 9 7 63 208 B Ave
382 25 7 175 265 B Ave
386 21 15 315 248 A Ave
391 12 10 120 277 A Ave
403 41 17 697 320 B Ave
405 34 13 442 345 A Ave
449 19 4 76 304 Palm Ave
Total Areas (SF) 11,150
ID Length Width Area Address
407 160 30 4,800 101 Grand Caribe
408 75 9 675 101 Grand Caribe
409 30 6 180 101 Grand Caribe
410 30 4 120 101 Grand Caribe
411 30 3 90 101 Grand Caribe
412 20 12 240 101 Grand Caribe
414 20 15 300 Coronado Cays Blvd
417 20 6 120 Port Royale Rd And Coronado Cays Blvd
418 33 4 132 Port Royale Rd And Coronado Cays Blvd
419 20 10 200 Blue Anchor Cay Rd And Coronado Cays Blvd 422 12 6 72 Coronado Cays Blvd
424 21 4 84 Coronado Cays Blvd
425 11 5 55 10 Bahana Bond
441 44 2 88 Coronado Cays Blvd
442 12 10 120 Coronado Cays Blvd
443 28 12 336 Coronado Cays Blvd
444 16 4 64 Coronado Cays Blvd
445 26 8 208 Coronado Cays Blvd
446 180 15 2,700 Coronado Cays Blvd
PARK 80 80 6,400 Cays Parking Lot
16,984
ID Length Width Area Address
33 21 4 84 200-308 Glorietta Blvd
174 34 6 204 202 F Ave
297 20 7 140 326 First Street
298 31 4 124 111 First Street
299 6 6 36 111 First Street
300 15 8 120 410 First Street
301 34 6 204 420 First Street
302 8 6 48 411 First Street
303 3 3 9 502 First Street
304 11 9 99 505 First Street
305 16 6 96 514 First Street
306 25 6 150 514 First Street
307 44 5 220 514 First Street
308 60 5 300 600 First Street
309 13 3 39 620 First Street
310 66 3 198 624 First Street
312 23 3 69 724 First Street
313 41 3 123 724 First Street
314 15 3 45 724 First Street
315 6 6 36 800 First Street
316 45 3 135 822 First Street
317 15 8 120 910 First Street
318 45 3 135 1004 First Street
321 15 4 60 1003 First Street
ASPHALT REPLACEMENT - ZONE 2
ASPHALT REPLACEMENT - ZONE 3
Total Areas (SF)
Item 4.i
July 21, 2026 City of Coronado Page 291
71 Contract No. 26-CO-EN-1139
ACA Approved Template (10-11-21) SD #4821-4737-7394 v1r 99 95 24 2,280 3 Sixpence Way
100 70 38 2,660 23 Sandpiper Strand
161 45 25 1,125 6 Green Turtle Rd
413 60 2 120 Coronado Cays Blvd
415 74 44 3,256 Mardi Grass Rd
416 4 4 16 52Mardi Grass Rd
421 65 15 975 20 Spinnaker Way
423 20 18 180 32 Trinidad Bib
426 12 8 96 5 Catspaw Cpe
427 14 13 182 16 Catspaw Cpe
428 13 5 65 18 Catspaw Cpe
429 18 15 270 44 Green Turtle Rd
430 20 10 200 5 Green Turtle Rd
431 71 20 1,420 12 Green Turtle Rd
432 42 6 252 3 Sandpiper Strand
433 26 13 338 23 The Point
434 4 4 16 5 Ginger Tree Lane
435 19 3 57 2 Jamaica Village Rd
436 22 15 165 85 Half Moon Band
437 34 4 136 85 Half Moon Band
438 18 2 36 85 Half Moon Band
439 15 13 195 86 Half Moon Band
440 5 5 25 84 Half Moon Band
Total Areas (SF) 14,065
ASPHALT REPLACEMENT - ZONE 2 (ADD ALTERNATIVE)
348 6 27 162 154 J Ave
360 28 6 168 266 G Ave
365 30 5 150 167 F Ave
383 3 3 9 1415 A Ave
387 12 6 72 239 A Ave
388 17 10 170 247 A Ave
389 18 11 198 263 A Ave
390 10 6 60 263 A Ave
401 15 8 120 300 B Ave
402 5 5 25 310 B Ave
448 5 12 60 323 Palm Ave
450 6 4 24 511 Palm Ave
451 16 4 64 511 Palm Ave
452 11 4 44 230 Palm Ave
453 14 8 112 230 Palm Ave
345 4 3 12 161 J Ave
346 4 3 12 155 J Ave
349 8 8 64 310 J Ave
351 9 7 63 145 H Ave
352 8 8 64 155 H Ave
353 25 4 100 178 H Ave
354 10 5 50 200 H Ave
356 16 4 64 600 H Ave
357 6 6 36 213 H Ave
363 5 5 25 141 F Ave
368 4 4 16 243 E Ave
369 30 7 210 231 E Ave
373 12 8 96 117 E Ave
381 65 10 650 215 B Ave
385 15 6 90 200 A Ave
404 45 4 180 339 B Ave
406 5 5 25 1401 A Ave
447 11 4 44 131 Palm Ave
3239
ASPHALT REPLACEMENT - ZONE 3 (ADD ALTERNATIVE)
Total Areas (SF)
Item 4.i
July 21, 2026 City of Coronado Page 292
CONTRACT
between
THE CITY OF CORONADO
as City
and
PAVEMENT COATINGS CO.
as Contractor
for construction of the
STREET PREVENTATIVE MAINTENANCE – ZONE 2 AND 3
CONTRACT NO. 26-CO-EN-1139
CITY OF CORONADO, CALIFORNIA
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 293
THIS CONTRACT is made as of July 21, 2026, by and between the City and the Contractor.
The City and the Contractor hereby agree as follows:
ARTICLE 1 – BASIC INFORMATION
1.1 City: City of Coronado
1825 Strand Way
Coronado, CA 92118
1.2 Project Name: Street Preventative Maintenance –
Zone 2 and 3
1.3 City’s Address for Notices: Jim Newton, City Engineer City of Coronado
Public Services & Engineering Department
1825 Strand Way
Coronado, California 92118-3005
1.4 Contractor: Pavement Coatings Co.
10240 San Sevaine Way
Jurupa Valley, CA 91752
1.5 Contractor’s Address for Notices: Pavement Coatings Co. 10240 San Sevaine Way
Jurupa Valley, CA 91752
Attention: James Wu
1.6 Project Location: Coronado, CA
1.7 City's Contract Officer: Leon P. Firsht, Director
Public Services & Engineering Department
1825 Strand Way
Coronado, CA 92118
619-522-7383
1.8 City Representative: Adriel Lara , Senior Engineer
Public Services & Engineering Department
(619) 522-6303
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 294
ARTICLE 2 – WORK
2.1 Contractor shall provide all labor, materials, equipment, tools, and services required by and shall perform all Work described in the Contract Documents. Contractor agrees to do additional Work arising from changes ordered by the City pursuant to Section 3 of the Greenbook.
ARTICLE 3 – CONTRACT DOCUMENTS
3.1 The Contract Documents consist of this executed Contract; Pre-Bid Information; Bidding Requirements; Bidder’s Proposal; Notice of Award; Notice to Proceed; General Conditions; Supplementary General Conditions; Exhibits; Specifications; Standard Specifications for Public Works Construction (Greenbook), 2024 Edition; Caltrans Standard Specifications, 2015 Edition; all Drawings shown on the List of Drawings; all Bonds required; the Addenda as shown below; and Change Orders.
3.2 The following addenda are incorporated into the Contract Documents:
No. Date of Issue:
1 June 22, 2026
2 June 23, 2026
3.3 The Contract Documents may not be modified orally or in any manner other than in writing in accordance with Section 3 of the Greenbook. All such modifications shall be incorporated in the Contract Documents.
3.4 Precedence of Contract Documents:
3.4.1 In the event of a conflict between component parts of the Contract Documents, the document highest in precedence shall control. The precedence shall be:
.1 Permits issued by jurisdictional regulatory agencies; .2 Change Orders and supplemental agreements, whichever occurs last; .3 Contract/Agreement;
.4 Bid/Proposal;
.5 Special Provisions and Addenda;
.6 Specifications (Technical Provisions);
.7 Project Plans;
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 295
.8 Standard Drawings, Details, and Specifications as referenced in the Specifications;
.9 Reference Specifications: Greenbook, 2024 Edition, and Caltrans Standard Specifications, 2015 Edition; and
.10 Notice of Award, Notice to Proceed, Pre-Bid Information, Bidding Requirements, Exhibits, Bonds and Bidder’s Proposal.
3.5 The Contract Documents comprise the entire contract between the City and Contractor concerning the Work to be performed for this Project. All prior negotiations or stipulations regarding this matter which preceded or accompanied the executing of these Contract Documents are conclusively deemed to be superseded by these Contract Documents. The Contract Documents are complementary; what is called for in one is binding as if called for by all. To the extent that portions of the Contract Documents are not attached to this Agreement, they shall be deemed incorporated herein by reference.
3.6 The interpretation, validity, and enforcement of the Contract Documents shall be governed by and construed under the laws of the State of California. Any suit, claim, or legal proceeding of any kind related to these Contract Documents shall be filed and heard in a court of competent jurisdiction in the County of San Diego.
ARTICLE 4 – CONTRACT SUM
4.1 City shall pay to Contractor, for the performance of the Work, the Contract Sum pursuant to General Conditions Article 9, subject to adjustment for unit price items, and as modified pursuant to the terms of the Contract Documents.
4.2 Contract Sum, including the Additives accepted by the City, is established as follows:
Contract Sum $1,299,889.75
4.3 The Contract Sum is: One million, two hundred ninety-nine thousand, eight hundred eighty-nine dollars and seventy-five cents.
ARTICLE 5 – CONTRACT TIME
5.1Contractor shall commence the Work on the date specified in the Notice to Proceed.
Construction anticipated to commence early September 2026 . The Work shall be fully completed within 60 working days (“Contract Time”) from the date of commencement specified in the Notice to Proceed, as modified pursuant to the terms of the Contract Document. Time is of the essence in the performance of all obligations under these Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 296
Contract Documents, and all timing requirements shall be strictly adhered to unless otherwise modified by the City.
ARTICLE 6 – LIQUIDATED DAMAGES
6.1 If Contractor fails to complete an area’s Work within the Contract Time as described in Article 5, Contractor shall pay to the City, as liquidated damages and not as a penalty, the sum of one thousand dollars ($1,000.00) for each calendar day after the expiration of the Contract Time per area that the Work remains incomplete. The City and Contractor agree that in the event the Work is not completed within the Contract Time, the City’s damages would be extremely difficult or impracticable to determine and therefore the City and Contractor agree that the amount stated herein is a reasonable estimate of the amount of such damages. The City may deduct any liquidated damages owed to the City, as determined by the City, from any payments otherwise payable to Contractor under this Contract. Nothing contained herein shall limit the City’s rights or remedies against Contractor for any default other than failure to complete the Work within the Contract Time. This provision for liquidated damages shall not be applicable nor act as a limitation upon the City if Contractor abandons the Work. In such event, Contractor shall be liable to the City for all losses incurred.
ARTICLE 7 – INDEMNIFICATION
7.1 In addition to any other obligations contained herein, Contractor shall defend, indemnify, and save harmless the City and its officials, officers, agents, consultants, employees, and volunteers, and each of them, (“City Indemnitees”) from and against any and all liability, claims, judgments, demands, causes of action, damages, costs, expenses, property damage, contract disputes, penalties, losses or liability, in law or in equity, of every kind and nature whatsoever, including but not limited to injuries or damages to persons or property arising directly or indirectly out of the conduct of the Contractor or its employees, agents, subcontractors, or others in connection with the execution of the Work or failure to executed the Work covered by these Contract Documents, except only for those claims or litigation arising from the established sole willful misconduct or active negligence of any City Indemnitee. Contractor’s indemnification shall include all claims for damages arising out of any infringement of patent rights or copyrights incidental to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. Contractor’s indemnification shall include any and all costs, expenses, attorneys’ fees and liability incurred by the City Indemnitees in enforcing the provisions of this section, and in defending against such claims, whether the same proceed to judgment or not. Contractor shall reimburse City for any expenditures, including reasonable attorneys’ fees, City may make by reason of such matters, and Contractor at its own expense shall, upon written request by the City, defend any such suit or action brought against the City Indemnitees.
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 297
ARTICLE 8 – MISCELLANEOUS PROVISIONS
8.1 Successors and Assigns
8.1.1 The City and Contractor respectively bind themselves and their successors, permitted assigns, and legal representatives to the other party and to the successors, permitted assigns, and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. This Contract and any portion thereof shall not be assigned or transferred, nor shall any of the Contractor’s duties be delegated, without the written consent of the City.
Any attempt to assign or delegate this Contract without the written consent of the City shall be void and of no force or effect. A consent by the City to one assignment shall not be deemed to be a consent to any subsequent assignment.
8.2 Survival
8.2.1 The provisions of the Contract, which by their nature survive termination or final completion of the Contract, including all warranties, indemnities, payment obligations, and the City’s right to audit Contractor’s books and records, shall remain in full force and effect after final completion or any termination of the Contract.
8.3 Rights and Remedies
8.3.1 All the City’s rights and remedies under the Contract Documents shall be cumulative and in addition to and not in limitation of all other rights and remedies of the City under the Contract Documents or otherwise available at law or in equity.
8.3.2 No term or provision hereof shall be deemed waived and no default or breach excused, unless such waiver or consent shall be in writing and signed by the party claimed to have waived or consented to such breach. The consent by any party to or waiver of a breach or default by the other shall not constitute a consent to, waiver of, or excuse for any other different or subsequent breach or default.
8.3.3 No provision contained in the Contract Documents shall create or give to third parties any claim or right of action against the City, the City Representative, or Contractor.
8.4 Compliance with Law
8.4.1 The Contractor and its subcontracts are required to comply with all applicable local, state, and federal laws, rules, regulations, orders, policies, protocols and guidance, including , but not limited to, obtaining and maintaining a City Business Certificate during the duration of this Contract and complying with COVID-19 sanitation protocols, health orders and guidance, whether or not said laws are expressly stated or referred to herein or subsequently enacted or amended.
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 298
8.5 The City’s Right to Audit
8.5.1 Contractor shall keep records of the direct reimbursable expenses pertaining to the Work and the records of all accounts between the Contractor and subcontractors.
Contractor shall keep such records on a generally recognized accounting basis. At any time during normal business hours, and as often as City may deem necessary, the Contractor shall make available to the City and entities and agencies designated by the City for examination, reproduction ad audit all of Contractor's books, records, contracts, correspondence, instructions, drawings, receipts, vouchers, purchase orders, and memoranda relating to the Work. Contractor shall preserve all such records for a period of at least four (4) years after final completion or after termination or final payment, whichever is later, and shall provide copies of same at City’s request.
8.6 Notices
8.6.1 All notices, demands, requests, consents, or other communications that this Contract contemplates or authorizes, or requires or permits either party to give to the other, shall be in writing and shall be personally delivered or mailed to the respective party at the addresses set forth in Article 1 of this Agreement. Either party may change its address by notice to the other party as provided herein.
8.6.2 Communications shall be deemed to have been given and received on the first to occur of (1) actual receipt at the offices of the party to whom the communication is to be sent, as designated above; or (2) three (3) working days following the deposit in the United States Mail of registered or certified mail, postage pre-paid, return receipt requested, addressed to the offices of the party to whom the communication is to be sent, as designated above.
8.7 Contract Officer. The City Engineer shall act as the City’s Contract Officer for this Contract. The City’s designated Contract Officer has the authority to direct the Contractor, approve actions, request changes, and approve change orders within her/his authority. Any obligation of the City under this Contract shall be the responsibility of the Contract Officer. Excepting the provisions pertaining to dispute resolution, no other person shall have any authority under this Contract unless specifically delegated in writing.
8.8 Governing Law. This Contract and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Contract shall be held exclusively in a State court in the County of San Diego. Contractor hereby waives the right to remove any action from San Diego County as is otherwise permitted by California Code of Civil Procedure Section 394.
8.9 Drafting Ambiguities. The Parties agree that they are aware that they have the right to be advised by counsel with respect to the negotiations, terms and conditions Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 299
of this Contract, and the decision of whether or not to seek advice of counsel with respect to this Contract is a decision which is the sole responsibility of each Party.
This Contract shall not be construed in favor of or against either Party by reason of the extent to which each Party participated in the drafting of the Contract.
8.10 Non-Discrimination. Contractor shall not discriminate against any employee or applicant for employment because of sex, race, color, age, religion, ancestry, national origin, disability, military or veteran status, medical condition, genetic information, gender expression, marital status, or sexual orientation. Contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their sex, race, color, age, religion, ancestry, national origin, disability, military or veteran status, medical condition, genetic information, gender expression, marital status, or sexual orientation and shall make reasonable accommodation to qualified individuals with disabilities or medical conditions. Such action shall include, but not be limited to the following: employment, upgrading, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay, or other forms of compensation, and selection for training, including apprenticeship. Contractor agrees to post in conspicuous places available to employees and applicants for employment any notices provided by City setting forth the provisions of this nondiscrimination clause.
8.11 Public Works Contract. Contractor acknowledges that this is a public works contract. Contractor represents and warrants that it is familiar with the requirements of the California Labor Code and agrees to comply at all times with relevant statutes and regulations, including, but not limited to the fact that Contractor must pay not less than prevailing wage rates as determined by the Director of Industrial Relations for all work done under this Contract. State of California prevailing wage rates can be found on the internet at http://www.dir.ca.gov/DLSR/PWD/Statewide.html. Contractor is responsible for determining the correct title for job classifications and determining the appropriate wage rate. Contractor agrees to perform this Contract in accordance with Attachment B and all the obligations set forth therein.
8.12 Contractor certifies that Contractor is aware of the requirements of the Immigration Reform and Control Act of 1986 (8 U.S.C. §§ 1101-1525) and has complied and will comply with these requirements, including, but not limited to, verifying the eligibility for employment of Contractor and all its agents, employees, representatives and subcontractors, and any other person performing any of the Work.
8.13 Rights Cumulative. All rights, options, and remedies of the City contained in this Contract shall be construed and held to be cumulative, and no one of the same shall be exclusive of any other, and the City shall have the right to pursue any one of all of such remedies or any other remedy or relief that may be provided by law or in equity, whether or not stated in this Contract.
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 300
8.14 Waiver. No waiver by either Party of a breach by the other Party of any of the terms, covenants, or conditions of this Contract shall be construed or held to be a waiver of any succeeding or preceding breach of the same or any other term, covenant, or condition herein contained. No waiver of any default of either Party hereunder shall be implied from any omission by the other Party to take any action on account of such default if such default persists or is repeated, and no express waiver shall affect a default other than as specified expressly in said waiver.
8.15 Severability. In the event that any part of this Contract is found to be illegal or unenforceable under the law as it is now or hereafter in effect, either Party will be excused from performance of such portion or portions of this Contract that is found to be illegal or unenforceable without affecting the remaining provisions of this Contract.
8.16 Attachments Incorporated. All Attachments and Contract Documents referenced in this Contract are incorporated into the Contract by this reference.
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 301
IN WITNESS WHEREOF, the undersigned represent and warrant that they have the right, power, legal capacity, and authority to enter into and execute this document on behalf of the City and the Contractor as applicable, and do hereby agree to the full performance of the conditions and covenants herein contained, and have caused this document to be executed by setting hereto their names, titles, signatures and date:
CITY: CONTRACTOR:
Pavement Coatings Co.
__________________________________
Tina Friend, City Manager Date
Contract/Agreement is approved for content:
__________________________________
James Wu Date
Vice President/Secretary
__________________________________
Leon P. Firsht, Director Date
___________________________________
Richard Yauney Date
Treasurer/CFO
Contract/Agreement is approved as to form:
__________________________________
Johanna N. Canlas, City Attorney Date
Attest:
__________________________________
Kelsea Holian, MMC, City Clerk Date
Attachment A: State Prevailing Wage Rates and
Obligations
California Contractor’s License(s):
Pavement Coatings Co.
A,C32 303609
(License
Classificat
ion)
(License
Number)
9/30/2026
(Expiration Date)
DIR Registration# 1000003382
Expiration Date:6/30/2027
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 302
ATTACHMENT A
STATE PREVAILING WAGE RATES AND OBLIGATIONS
Prevailing Wage Rates: This project is a "public work" in accordance with California Labor Code §§1720, et seq. It is the sole responsibility of the CONTRACTOR to ensure that all workers employed in the execution of the AGREEMENT are paid the correct prevailing wage rate.
CONTRACTOR is required to comply with California Labor Code Sections 1771, 1775, 1776, 1777.5, 1813 and 1815, which are incorporated by reference, and the CONTRACTOR agrees to comply with all of the above-referenced provisions and all other statutes or regulations that may be applicable to the performance of the DESCRIBED SERVICES. Specifically, CONTRACTOR agrees to:
a. Pay all workers not less than the general prevailing rate of per diem wages for work of similar character in the locality in which the public work is performed. b. Pay all workers not less than the general prevailing rate of per diem wages for holiday and for overtime work that exceeds 8 hours in one day and 40 hours in one week. c. Adhere to the compliance measures outlined in Labor Code section 1775(b) for any subcontractor that the CONTRACTOR chooses to use on this project. d. Maintain, certify and make available for inspection, payroll records as required by Labor Code section 1776.
e. Comply with all apprenticeship requirements pursuant to Labor Code section 1777.5.
Not less than the State general prevailing wages, as determined by the Director of the Department of Industrial Relations, shall be paid by the CONTRACTOR and its subcontractors to all workers employed on the project, as applicable. The statutory provisions for penalties for failure to pay prevailing wages and for failure to comply with state's wage and hour laws will be enforced.
CITY has obtained from the Director of the Department of Industrial Relations said Director's General Prevailing Wage Determinations for the locality in which the work is to be performed.
Said determinations are on file and available for review online at the Department of Industrial Relations’ website located at: http://www.dir.ca.gov/DLSR/PWD SB 854 Notice: CITY public works projects are subject to compliance monitoring and enforcement by the Department of Industrial Relations (“DIR”) in accordance with Labor Code Section 1771.4(a)(1). As part of this program, CONTRACTORS and subcontractors on Public Works Projects are required to be registered with the DIR in accordance with Labor Code Section 1725.5.
Unregistered CONTRACTORS are not qualified to bid on, be listed in a bid, listed as a subcontractor, or engage in the performance of any public works contract, all as more particularly described in Labor Code Section 1771.1(a). CITY has no duty to accept a bid or enter into a contract without proof of the CONTRACTOR’s current registration pursuant to Labor Code Section 1771.1(b). The prime CONTRACTOR shall be required to post the job site with all notices required by regulations per Labor Code Section 1771.4(a)(2), whether or not CITY also posts.
Labor Code Compliance: CONTRACTOR shall comply with the provisions of the Labor Code requiring the payment of prevailing wages on public works, commencing with Section 1720. In Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 303
accordance with Labor Code Section 1775, the CONTRACTOR shall forfeit an amount, as determined by the Labor Commissioner, for each worker paid less than the applicable prevailing wage rate for the work or craft in which that worker is employed for any work done under the AGREEMENT by CONTRACTOR or by any subcontractor. CONTRACTOR agrees to pay the difference between the prevailing wage rate and amount paid to each worker in accordance with Labor Code Section 1775 (a)(2)(E).
Pursuant to Labor Code Section 1770, the Director of the DIR has ascertained the general prevailing rate of per diem wages and a general prevailing rate for legal holiday and overtime work for each craft required for execution of the AGREEMENT. In accordance with Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file and can be viewed during normal business hours at Coronado City Hall, located at 1835 Strand Way, Coronado, CA 92118.
CONTRACTOR shall post a copy of the applicable prevailing wage rates at the job site.
Wage rates set forth are the minimum that may be paid by the CONTRACTOR. Nothing herein shall be construed as preventing the CONTRACTOR from paying more than the minimum rates set. No extra compensation whatsoever will be allowed by the CITY due to the inability of CONTRACTOR to hire labor at minimum rates, nor for necessity for payment by CONTRACTOR of subsistence, travel time, overtime, or other added compensations, all of which possibilities are elements to be considered and ascertained to CONTRACTOR’s own satisfaction in preparing its bid or entering into the AGREEMENT.
If it becomes necessary to employ crafts other than those listed in the General Prevailing Wage Rate, CONTRACTOR shall obtain a wage rate determination. The rates thus determined shall be applicable as minimum from the time of initial employment. CONTRACTOR shall be responsible for paying the applicable rate.
CONTRACTOR and each subcontractor shall keep, certify and make available accurate payroll record in accordance with Labor Code Sections 1771.4(a)(3) and 1776. The record shall contain the names, addresses, social security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by CONTRACTOR and/or subcontractor in connection with the DESCRIBED SERVICES. Payroll records shall be certified and shall be on forms provided by the Division of Labor Standards Enforcement, or shall contain the same information as those forms. Upon written request by the CITY, CONTRACTOR’s and subcontractor's certified payroll records shall be furnished within 10 days. CONTRACTOR’s and subcontractor's certified payroll records shall be available for inspection at the principal office of the CONTRACTOR.
Apprentices: CONTRACTOR and each subcontractor shall comply with the requirements of Labor Code Section 1777.5, and any related regulations regarding the employment of registered apprentices. Properly registered apprentices shall be employed in the execution of the DESCRIBED SERVICES at the ratios required, but in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work. Every apprentice shall be paid the standard wage paid to apprentices under the regulations of the craft or trade at which the apprentice is employed, and shall be employed only at the work of the craft or trade to which the apprentice Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 304
is registered. The CONTRACTOR shall be responsible for compliance with Labor Code Section 1777.5 for all apprenticeable occupations.
Workers’ Compensation: CONTRACTOR and each subcontractor will be required to secure the payment of workers’ compensation to his or her employees and shall comply with the requirements of Labor Code Section 3700, and any related regulations regarding workers’ compensation.
In signing this AGREEMENT, CONTRACTOR certifies as follows:
“I hereby certify that I have read and examined Sections 3700 and 3800 of the California Labor Code. I am aware of and will comply with Section 3700 of the Labor Code, requiring every employer to be insured against liability for workers' compensation or to undertake self-insurance before commencing any of the work. I further certify that if I should consult, contract or subcontract with any person, firm, or company to do all or any part of the work for which this AGREEMENT covers, I shall assure compliance by CONTRACTOR or with Sections 3700 and 3800 of the State Labor Code. I further certify that all CONTRACTORS (both primary and subcontractors) are registered with the State of California Department of Industrial Relations in compliance with Labor Code Section 1725.5.”
Attachment 2
Item 4.i
July 21, 2026 City of Coronado Page 305
RE Services | City of Coronado Street Preventive Maintenance FY 25/26
RE SERVICES
SCOPE OF SERVICES AND FEE PROPOSAL
Street Preventive Maintenance FY 25/26 (SPM26)
Contract No. 26-CO-EN-1139 | City of Coronado
Date June 15, 2026
Prepared By Reddy Engineering Services, Inc. (RE Services) Basis of Fee Estimated 60 Working Days; SPM26 fee schedule Reddy Engineering Services, Inc. (RE Services) is excited to provide this draft scope of services and fee proposal for construction management, inspection, office engineering, community coordination, and optional stormwater and labor compliance support for the City of Coronado's Street Preventive Maintenance FY 25/26 project. We reviewed the bid package and understand that this effort is not simply a slurry seal job - it is a high-visibility, access-sensitive program across Coronado Cays and Coronado Village that requires disciplined contract enforcement, practical field judgment, and proactive communication with residents, businesses, EDCO, emergency services, City operations, and special destinations such as Ferry Landing, Sharp Coronado Hospital, Marriott Hotel, Smart & Final, and Cays clubhouse areas.
Our interest in this project is very strong because it aligns directly with RE Services' award winning pavement preservation, slurry seal, asphalt repair, public outreach, contract administration, and high-touch municipal delivery experience. Our proposed team has recently delivered similar pavement rehabilitation and slurry programs for the City of Vista, City of Carlsbad, City of Encinitas, City of Poway, County of San Diego, and City of Chula Vista. We will bring that same field-proven, resident-sensitive approach to Coronado.
Project-Specific Understanding
The contract documents identify a 60-working-day preventive maintenance project anticipated to start by early September 2026, with $1,000 per calendar day liquidated damages for work that exceeds the contract time. The Engineer's Estimate is $1,235,000. The base bid includes approximately 2,911,355 square feet of Type I emulsion-aggregate slurry, 28,134 square feet of 6-inch-minimum asphalt concrete replacement/dig outs, crack sealing, striping and pavement marking restoration, BMP implementation, traffic control, sweeping, public notification, and closeout. The bid also includes an optional additive for an additional 17,304 square feet of asphalt concrete replacement.
Draft Scope of Services and Fee Proposal
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 306
RE Services | City of Coronado Street Preventive Maintenance FY 25/26 Draft Scope of Services and Fee Proposal
Contract Requirement What RE Services Will Focus On Why It Matters to Coronado 60 working days; LDs of $1,000/calendar
day
Track schedule logic, progress,
sequencing, and working day impacts;
document delays in real time.
Keeps contractor accountable and
protects the City from avoidable time
disputes.
2,911,355 SF of slurry seal across Zone 2
Cays and Zone 3 Village
Confirm surface prep, sweeping, crack
sealing, access control, slurry
consistency, cleanup, re-sweeping, and
segment acceptance.
Slurry work is highly visible; clean
execution reduces complaints and rework.
28,134 SF base dig outs plus 17,304 SF
optional additive
Verify limits, depth to existing subgrade or
6-inch minimum, subgrade preparation,
AC placement, compaction coordination,
and quantity agreement.
Accurate quantities and quality control are
key to budget confidence and pavement
performance.
Public notifications: door hangers 7 days,
No Parking 72 hours, agency notifications
72 hours
Review notices, coordinate distribution
expectations, verify field posting, and
document access-sensitive areas.
Coronado residents and businesses
expect early, accurate, and respectful
communication.
Traffic constraints at Cays Entrance, First
Street/Ferry Landing, Hospital/Marriott,
clubhouses, trash routes, and Smart &
Final
Review traffic control plans against
contract-specific restrictions before work;
monitor field compliance daily.
Maintains access to essential services,
businesses, parking, residences, and
community facilities.
BMP Construction Plan required even
though project is identified as exempt
Review BMP approach, inspect laydown
areas, portable restrooms, wash water,
mark-out removal, sweepings, and runoff
risks.
Prevents small BMP issues from
becoming resident complaints, City
exposure, or regulatory concerns.
Prevailing wage, DIR registration, certified
payroll, and apprenticeship requirements
Provide optional labor compliance review
tied to progress payment and closeout
records.
Reduces audit exposure and avoids
payment or closeout delays.
Contract Features We Will Manage Closely
• Zones and access: The work includes Coronado Cays slurry limits, Jamaica Village Road parking lot striping, Coronado Cays laydown area, Coronado Village slurry limits, Bradley Field parking lot, and the A Avenue laydown area between First and Second Street with Public Services Facility gate access maintained. • Dig out locations: The base asphalt replacement quantities are split between Zone 2 and Zone 3, with large repairs at locations such as 101 Grand Caribe, Coronado Cays Boulevard, the Cays parking lot, First Street, Alameda Boulevard, Second Street, Glorietta Boulevard, A/B/C/E/F/G/H/J Avenue, and Palm Avenue. The optional additive includes additional Cays and Village repairs.
• Submittals: The contractor must provide the construction schedule, traffic control plan, BMP Construction Plan / Water Pollution Control Plan, asphalt concrete mix design, slurry seal mix design, crack sealant product data, and paint/striping/pavement marking submittals.
• Work restrictions and public convenience: RE Services will monitor temporary access, property access during nonworking hours, No Parking postings, door hangers, driveway notices, trash collection schedules, school/post office/EDCO notifications, and the 500-foot pedestrian crossing/parking accommodation intent in the traffic control provisions.
• JMF details: The contract calls for Type I-CQS-1h-EAS slurry, Type III-C2-PG 64-10-R0 asphalt concrete for dig outs, crack cleaning/sealing requirements, protection of decorative/tile crossings, thermoplastic markings for legends/crosswalks, continental crosswalk upgrades, and daily agreed-upon slurry quantities. • Laydown and housekeeping: Available storage areas are limited, must be kept clean, protected with BMPs, fenced/screened where required, and restored at completion, including slurry sealing and pavement marking repainting of affected storage areas.
• Noise, safety, and neighborhood standards: Coronado's construction noise curfew and 75 dBA residential limit, daily hazard removal, temporary signs/barricades, and access during non-working hours will be treated as core inspection items, not administrative afterthoughts.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 307
RE Services | City of Coronado Street Preventive Maintenance FY 25/26 Draft Scope of Services and Fee Proposal
Scope of Services
Task 1.0 - Project Initiation, Preconstruction, and Risk Alignment RE Services will help the City set the project up for a clean start. This task will be used to align the contractor, City staff, field inspectors, materials testing staff, and community coordination expectations before construction begins. • Review the contract documents, attachments, quantity schedule, submittal list, working day requirements, traffic control constraints, laydown areas, public notification provisions, and special access locations. • Prepare and conduct a preconstruction meeting agenda focused on Coronado-specific risks: Cays access, First Street/Ferry Landing constraints, Hospital/Marriott access, Smart & Final notification, EDCO trash schedule, clubhouse access, no parking/door hanger requirements, BMPs, laydown controls, striping restoration, and schedule accountability.
• Confirm communication protocols, emergency contacts, issue escalation procedures, RFI/submittal procedures, payment backup expectations, change-order documentation, labor compliance expectations, and closeout deliverables.
• Develop an early risk register/action log to track schedule-critical submittals, traffic control approvals, material mix designs, public notices, and pending City decisions before field work begins.
Task 1.1 - Construction Management, Office Engineering, and Contract Administration • Provide construction management support and serve as the City's extension of staff for contract administration, meeting coordination, schedule review, RFI/submittal tracking, correspondence, field issue documentation, and progress reporting.
• Review contractor schedule updates and compare progress against the 60-working-day contract time, work sequencing, slurry curing/striping sequence, and contract restrictions that may affect progress. • Track submittals required by the contract, including the construction schedule, traffic control plan, BMP plan/WPCP, asphalt concrete mix design, slurry seal mix design, crack sealant data, and paint/striping/pavement marking materials.
• Support progress payment review, including daily agreed quantities, quantity sheets, backup verification, retention awareness, and coordination of outstanding payroll/BMP/submittal documentation that could affect payment readiness.
• Prepare meeting notes, action items, issue logs, change-order documentation, field order support, and force-account documentation when directed by the City.
• Maintain organized project records suitable for City audit, closeout, and future pavement program reference.
Task 1.2 - Field Inspection and Quality Documentation
• Inspect asphalt dig out work, including sawcut/layout confirmation, removal to existing subgrade or 6-inch minimum depth, unsuitable material observations, subgrade preparation, AC placement, compaction coordination, grade matching, cleanup, and agreed daily quantities.
• Inspect crack sealing, surface preparation, weed/vegetation removal, street sweeping, protection of decorative/tile crossings, valve/manhole protection, slurry application, joint neatness, edge cleanup, re-sweeping, and segment readiness before and after slurry placement.
• Observe slurry consistency and field quality activities, coordinate City material testing for slurry (by Others), bituminous paving materials, and relative compaction, and document rejected or corrective work when necessary. • Inspect removal and restoration of striping, markings, pavement markers, thermoplastic legends, continental crosswalk upgrades, double yellow intersection approach markings, and parking lot striping such as Jamaica Village Road and Bradley Field areas.
• Document daily labor, equipment, materials, visitors, weather, work locations, traffic control, public notifications, incidents, photos, measurements, and conversations with the contractor and City.
Task 1.3 - Traffic Control, Access, and Community Coordination • Review the traffic control plan for consistency with the contract and CA MUTCD, including lane closures, detours, pedestrian routes, driveway access, bus stop coordination, flagging needs, and daily restoration of safe access. • Monitor contract-specific access constraints, including maintaining at least one lane at the Coronado Cays Entrance, access to Montego Court/North Caribe Cay Boulevard/Delaport Way/Tunapuna Lane, access to Cays clubhouses, and uninterrupted access to Sharp Coronado Hospital and Marriott Hotel.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 308
RE Services | City of Coronado Street Preventive Maintenance FY 25/26 Draft Scope of Services and Fee Proposal
• Monitor First Street requirements, including full-closure restrictions, variable message signs, Landing parking lot access, Ferry Landing access, underground parking at The Point condominiums, pedestrian crossing frequency, and business notifications.
• Review and field-check public notifications, including 7-calendar-day door hangers, 72-hour No Parking signs, 72- hour notices to EDCO/Post Office/schools/City Engineer, one-week business notifications at First Street and Orange Avenue, and three-week Smart & Final notification.
• Document resident/business issues and contractor responses so the City has a clear record of concerns, corrective actions, and contract enforcement decisions.
Task 2.0 - Project Closeout and Final Report
• Track punch-list items, deficient work, cleanup, re-sweeping, mark-out removal, striping restoration, laydown restoration, and final corrective work through acceptance. • Support final quantity reconciliation, final payment review, retention release coordination, and verification of record drawings and closeout submittals.
• Prepare a concise closeout memorandum/final report summarizing the work completed, major issues, change orders, final quantities, outstanding warranty considerations, lessons learned, and recommendations for future annual pavement programs.
Task 3.0 - Optional Stormwater Monitoring and BMP Compliance Recommended City value: Although the contract identifies the project as exempt, it still requires an approved BMP Construction Plan, implementation, monitoring, and revision when field conditions change. This optional service is a small investment that gives the City a specialized compliance layer during sweeping, crack sealing, slurry placement, dig outs, laydown use, portable restroom placement, mark-out removal, and potential wash water activities. • Review the contractor's BMP Construction Plan/WPCP for consistency with the contract, City Municipal Code Title 61, MS4/NPDES requirements, GCASP expectations, and field practicality. • Perform targeted stormwater inspections for inlet protection, sediment tracking, slurry/emulsion handling, sweepings, laydown BMPs, portable restroom secondary containment, and mark-out/wash water controls. • Coordinate prompt corrective action with the RE, inspector, City, and contractor before minor BMP concerns become resident-facing or regulatory issues.
• Provide weather monitoring support and pre-rain recommendations if forecast conditions warrant. • Prepare stormwater documentation for the City's project file and closeout record.
Task 4.0 - Optional Labor Compliance
Recommended City value: The contract is a public works project subject to prevailing wage, DIR registration, certified payroll, and apprenticeship requirements. Labor compliance support is a relatively modest cost compared with the construction value, but it materially reduces audit risk, payment delays, and closeout disputes. • Review certified payroll records and supporting documentation for consistency with prevailing wage requirements and contract requirements.
• Monitor apparent classification, fringe benefit, apprenticeship, overtime, subcontractor, and DIR registration issues and coordinate discrepancies with the RE and City.
• Track labor compliance submittals and outstanding items in coordination with progress payment review. • Support written documentation requests, contractor follow-up, discrepancy logs, and labor compliance closeout summaries.
Task 5.0 - Materials Sampling and Testing Coordination (By Others) Materials sampling and testing services are assumed to be provided by others. RE Services will coordinate testing needs with the City, contractor, and testing personnel, including slurry testing, bituminous paving materials, and relative compaction. Our inspection staff will document testing coordination, failing or corrective work, retesting needs, and any impacts to payment or acceptance.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 309
RE Services | City of Coronado Street Preventive Maintenance FY 25/26 Draft Scope of Services and Fee Proposal
Deliverables
• Preconstruction agenda, notes, and action-item/risk log. • Submittal, RFI, and change-order logs.
• Construction meeting notes and progress updates.
• Daily inspection reports, photographs, quantity documentation, agreed quantities, and Q-sheets. • Traffic control, access, notification, BMP, and public issue documentation. • Progress payment support and force-account documentation, as applicable. • Optional stormwater inspection logs and corrective-action tracking, if authorized. • Optional labor compliance review logs, discrepancy tracking, and closeout summary, if authorized. • Punch-list tracking, final quantity support, closeout memorandum/final report, and project records package.
Staffing Plan
Name Role Project-Specific Responsibility
Vinay Reddy, PE, QSD Principal-in-Charge / Senior Construction Manager
Executive oversight, senior CM guidance,
issue escalation, City coordination, quality
assurance, claims/change-order strategy,
and high-touch community delivery
support.
Alex Medina, CMIT Civil Inspector - Prevailing Wage Lead field inspection for dig outs, crack sealing, slurry, striping, traffic control,
BMP observations, daily reports, photos,
agreed quantities, Q-sheets, and field
coordination.
Chrestina Mansoor, EIT, QSP, CESSWI Outreach / Office Engineer / Support Civil Inspector
Office engineering, submittals, RFIs,
payments, meeting notes,
WSWD/schedule support, public outreach
coordination, field support, and closeout
organization.
Amy Comte, CPESC, CESSWI, QSD/P,
ToR
Stormwater Inspector - Prevailing Wage
(Optional)
Specialized BMP plan review, stormwater
inspections, weather monitoring,
laydown/portable restroom/wash water
controls, corrective-action tracking, and
closeout support.
Michalle Beringhaus, PMP, CCM Project Controls Specialist - Labor Compliance (Optional)
Certified payroll review, prevailing wage
monitoring, DIR/eCPR/LCP experience,
discrepancy tracking, documentation
control, and City closeout support.
Project Controls Specialist (Intern) Project Controls / Administrative Support File organization, shadowing inspection, payment backup, issue/action tracking,
logs, and closeout record assembly under
senior staff supervision.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 310
RE Services | City of Coronado Street Preventive Maintenance FY 25/26 Draft Scope of Services and Fee Proposal
Fee Summary
The fee attached is based on the provided SPM 25/26 fee schedule and assumes approximately 60 working days.
Assumptions
• Services are based on the SPM 25/26 fee schedule and an estimated 60 working day construction duration. • Materials sampling and testing will be provided by others; RE Services will coordinate testing needs and document results/impacts.
• The City will provide the executed construction contract, final addenda, contractor schedule, approved plans/specifications, and City templates/forms.
• RE Services will not direct contractor means and methods or assume contractor site safety responsibility; observed noncompliance will be documented and elevated.
• Stormwater, labor compliance, and BridgeDoc are optional and will be performed or used only if authorized by the City.
RE Services appreciates the opportunity to support Coronado with a proactive CM team that understands the City's standards, community sensitivity, and needs firm but practical contract enforcement.
Sincerely,
Vinay Reddy, PE, QSD
Principal-in-Charge
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 311
Estimated Working Days 60
TASK: CM and Inspection RATE: $229.00 $219.00 $189.00 $189.00 $189.00 $80.00 $80.00 HOURS FEE 5 44 44 1 1 1 96 $19,446.00
12 120 360 120 240 852 $138,948.00
2 24 12 38 $7,982.00
48 48 $9,072.00
48 48 96 $7,680.00
0 $80.00
CM and Inspection Services Total 19 188 416 120 49 49 289 230 $183,208.00 EE: $1,235,000.00
CM Fee % 15%
Other Direct Cost (Optional):
BridgeDoc $95/mo @ 6 mo = $570.00
Project
Controls
Specialist
(Intern)
City of Coronado
STREET PREVENTIVE MAINTENANCE FY 25/26
CIP # 26-CO-EN-1139
RE Services
ALT #3
CLASSIFICATION
Principal-inCharge Senior Construction Manager Civil Inspector - Prevailing Wage (75%) Outreach / Office Engineer (25%) Stormwater Inspector - Prevailing Wage (Optional) Project Controls Specialist (Labor Compliance) Notes: Estimate is based on anticipated construction duration of approximately 60 Working Days. The work week runs from Monday through Friday. Construction management and administrative duties are based on the anticipated hours required to complete the work.
Exclusions: Additional effort in the form of longer shifts requiring overtime or an extension in project duration due to issues such as problems with the contract documents, right-ofway delays, utility conflicts, unsuitable materials, or inefficiencies with the Contractor's operations are not considered in this estimate, and may require an amendment to this estimated budget.
3.0 Stormwater Monitoring (Optional)1.0 Construction Management and Administration1.1 Prepare/Conduct/Participate Preconstruction Meeting2.0 Final Reports and Project Closeout5.0 Materials Sampling and Testing (By Others)4.0 Labor Compliance (Optional)1.2 Administrative and Field Inspection Services Attachment
3 Item 4.i
July 21, 2026 City of Coronado Page 312
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Vinay Reddy, PE, QSD Principal-in-Charge /
Senior Construction Manager
a. TOTAL b. WITH CURRENT FIRM
18 8
15. FIRM NAME AND LOCATION (City and State)
RE Services (San Diego, CA)
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) B.S., Civil Engineering, University of California at Davis (2008) Civil Engineer, CA, #86996, exp. June 30, 2027 Qualified SWPPP Practitioner, CA, #86996
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Vinay Reddy is an award-winning Construction Manager and visionary leader behind one of Southern California’s fastestgrowing construction management firms. His and his firm’s expertise centers on asphalt concrete operations, overlays, inlays, slurry seals, and digouts, with a proven record delivering multi-year resurfacing and pavement preservation programs for cities and counties across the region.
As Principal-in-Charge, Vinay has guided Reddy Engineering Services to become a recognized leader in managing complex pavement and slurry seal programs for agencies such as the County of San Diego, City of Chula Vista, City of Encinitas, SANDAG, and Caltrans. Under his leadership, RE Services has earned multiple APWA, ASCE, and CMAA awards for its innovation in recycled asphalt pavement (RAP) and Type II slurry applications, advancing sustainable pavement rehabilitation practices throughout the region.
Vinay continues to champion excellence in construction management by combining technical depth, field-proven quality control, and forward-thinking leadership that is shaping the next generation of asphalt and slurry expertise in Southern California.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Vista CM Services, Slurry Seal Project 2026, Vista, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Served as Principal-in-Charge and Construction Manager for the City of Vista’s Slurry Seal Project 2026, supporting delivery of a citywide pavement rehabilitation program across multiple residential, collector, and arterial streets. Provided construction management, inspection oversight, schedule coordination, quantity verification, progress documentation, contractor coordination, public notification support, traffic control review, materials testing coordination, and contract administration for slurry seal, PMAC overlay, AC dig outs, crack sealing, striping removal and replacement, valve and monument adjustments, detector loop replacement, BMP implementation, and public-facing construction impacts. Supported compliance with City of Vista requirements, Greenbook standards, prevailing wage requirements, stormwater controls, traffic control restrictions, and agency coordination to help maintain safe access, minimize disruptions, and keep the project moving efficiently.
b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Carlsbad CM&I Services, FY 2023 Slurry Seal Project, Carlsbad, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2025 2025
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Served as Project Manager and Resident Engineer for the City of Carlsbad’s $6.6 million slurry seal and overlay program.
Directed construction administration, Q-sheet verification, pay quantity review, materials testing coordination, traffic control oversight, BMP compliance, and non-conformance resolution for patch repairs, cold mill and overlay, slurry seal, utility adjustments, and striping improvements. Helped position the project for efficient delivery through proactive issue management and strong agency coordination. Provided proactive coordination between the City, contractor, inspectors, testing personnel, utility stakeholders, and affected residents to minimize disruptions, maintain public access, and keep construction activities aligned with schedule and quality expectations. Supported efficient delivery through early identification of field conflicts, responsive issue resolution, strong quantity control, and consistent agency communication.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 313
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-2 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Poway CM&I Services, FY 2023-2024 Patch Repair Project, Poway, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2024 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Reddy served as the Resident Engineer on the City of Poway's $2.6 million Patch Repair Project, which involved deep patch repairs and curb ramp improvements in Zone 7, including Scripps Poway Parkway, Community Road, Kirkham Way, Kirkham Road, and part of Tech Center Drive. He managed the construction administration of the project, with daily responsibilities encompassing a wide range of tasks. These included authoring and verifying inspector Q-Sheets, reviewing the validity of daily pay quantities with the contractor, and coordinating materials sampling and testing with Subconsultants.
He also handled unforeseen conditions in collaboration with the Senior Civil Engineer and contractor, managed public relations with residents, and oversaw change controls. Additionally, he reviewed submittals, enforced traffic control permits, coordinated and enforced Best Management Practices (BMPs), authored project correspondence and non-conformance reports, and coordinated with project stakeholders.
d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of San Diego On-Call Construction Management Services, Countywide Slurry Treatments FY21-22, Borrego Springs, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Vinay Reddy, PE, QSD served as the Resident Engineer for the County of San Diego Countywide Slurry Seal Treatments Project, a $2.5 million effort that maintained 18 County road segments through pavement resurfacing, localized repairs, crack sealing, and new striping and delineation. The project incorporated recycled asphalt pavement (RAP) in the Type II slurry and chip seal applications, earning consideration for a Project of the Year award in the sustainability category. Mr. Reddy led weekly construction meetings, reviewed and processed submittals, RFIs, progress payments, and as-builts, and oversaw stormwater management for the Lead Responsible Party. He supervised County and consultant inspection staff to ensure all work complied with the California Department of Transportation Standard Specifications, the Standard Specifications for Public Works Construction (Greenbook), and County of San Diego Standard Drawings. Mr. Reddy coordinated with Maintenance, County Lab, and Design staff to execute timely change orders and avoid remobilization costs. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Chula Vista On-Call Construction Management Services, RMRA Major Pavement Rehabilitation FY19-20, Chula Vista, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2023 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Served as Resident Engineer for the City’s $4.5 million annual roadway maintenance program spanning 130 roadway segments.
Performed constructability review and quantity takeoffs, led the preconstruction meeting, served as the primary communications lead, managed submittals, coordinated City and Caltrans inspections, supported public outreach, processed payments and field orders, oversaw stormwater compliance, and advanced project closeout and as-built documentation. Brought organized, fullservice construction management support to a complex, multi-segment pavement rehabilitation effort.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 314
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Alex Medina, CMIT Civil Inspector - Prevailing Wage
a. TOTAL b. WITH CURRENT FIRM
13 3
15. FIRM NAME AND LOCATION (City and State)
Reddy Engineering Services, Inc. (San Diego, CA)
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) High School Diploma Construction Manager-in-Training (CA CMCI)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Medina brings extensive expertise in hot mix asphalt (HMA) paving and slurry seal, garnered from his involvement in projects spanning the County of San Diego, Caltrans, local municipalities, and private entities. His career encompasses diverse roles, including leading paving crews as a general foreman for a contractor and currently serving as a consultant inspector. With a superior understanding of construction means and methods, production rates, Extra Work at Force Account methodologies and analysis, documentation, as well as specification interpretation, Mr. Medina is uniquely positioned to contribute to a team environment to drive project success. Mr. Medina’s familiarity with regionals systems and standards such as the Caltrans CAT filing system, "Greenbook" Standard Specifications for Public Works Construction, California MUTCD, and Caltrans, and County of San Diego Construction Manuals, Regional Standard Specifications, and Standard Drawings further enhances his effectiveness.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Encinitas CM&I Services, FY 2025-2026 Pavement Rehabilitation Overlay Project (CS26A), Encinitas, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Medina served as Lead Roadway Inspector on the City of Encinitas’ $4.44M FY 2025-2026 Pavement Rehabilitation Project (CS26A), delivered under the Base Bid and Additive Alternates 1 through 4. The project included pavement rehabilitation improvements consisting of asphalt pavement repairs, cold milling, pavement overlay, slurry seal-related work, striping and pavement marking restoration, traffic detector loop coordination, utility adjustments, pedestrian access improvements, traffic control, and related public works improvements. In this role, Mr. Medina led day-to-day field inspection activities, verified contractor compliance with plans, specifications, standard drawings, special provisions, traffic control requirements, and safety requirements, and supported the Resident Engineer and City staff in maintaining quality, schedule, and public access. His responsibilities included verifying pay quantities, tracking production, monitoring traffic control, documenting daily construction activities through reports and photographs, coordinating with contractor foremen and City representatives, supporting submittal/RFI review for field impacts, assisting with change-order and force-account documentation, verifying asphalt placement and compaction, confirming pavement marking layouts, and maintaining project records in accordance with City and Caltrans-style filing expectations. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Carlsbad CM&I Services, 2023 Slurry Seal Project, Carlsbad, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2025 2025
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Medina served as a Lead Construction Inspector on the City of Carlsbad’s $6.6 Mil Pavement Rehabilitation Slurry Seal Project. The project scope consisted of traffic control, erosion control, water pollution control, asphalt pavement repairs, crack sealing, cold milling, paving, and slurry sealing. The project also included removal and replacement of pavement striping and markings and adjustment of manhole valves and survey monuments. Mr. Medina performed field inspections and provided daily updates on work progress. His daily responsibilities included documenting construction progress in daily reports, measuring and agreeing to daily pay quantities with the Contractor, calculating quantities, preparing Q-Sheets, conducting EEO interviews, enforcing traffic control permit, BMP inspection, coordinating unforeseen conditions with the Resident Engineer and City staff, change controls, public relations with residents, and coordinating with other agencies and project stakeholders Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 315
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-2 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Encinitas CM&I Services, FY 2023-2024 Pavement Rehabilitation Overlay Project, Encinitas, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2025 2025
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Medina served as the Lead Roadway Inspector on the City of Encinitas $3.6 Mil Pavement Rehabilitation Overlay Project. The scope consists of Full depth and Surface depth repairs, crack sealing, milling, paving, installation or removal and replacement of concrete ramps, reconstruction of traffic detector loops, installation or removal and replacement of pavement striping and markings, adjustment of manholes valves and survey monuments, and other related work as required by the various details and specifications. Mr. Medina managed the field inspection and document controls portion of the project. His daily responsibilities included calculating quantities, preparing Q-Sheets, conducting EEO interviews, enforcing traffic control permit, BMP inspection, measuring and agreeing to daily pay quantities with Contractor, coordinating unforeseen conditions with the Resident Engineer and City staff, public relations with residents, and change controls, reviewing submittals, reviewing RFIs and Change Orders, Force Account analysis, authoring project correspondence and non-conformance reporting, and coordinating with other agencies and project stakeholders.
d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Poway CM&I Services, FY 2023-2024 Patch Repair Project, Poway, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2024 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Medina served as a Lead Roadway Inspector on the City of Poway $1.3 Mil Patch Repair Project. The scope consists of Deep patch repairs and curb ramp improvements in Zone 7 which includes, Scripps Poway Parkway, Community Road, Kirkham Way, Kirkham Road, and a portion of Tech Center Drive. Mr. Medina managed the field inspection and document controls portion of the project. His daily responsibilities included preparing Q-Sheets, measuring and agreeing to daily pay quantities with Contractor, coordinating unforeseen conditions with the resident engineer and City staff, public relations with residents, and change controls, reviewing submittals, enforcing traffic control permit, BMP inspection, authoring project correspondence and tracking nonconformance reporting, and coordinating with project stakeholders. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Chula Vista On-Call Construction Management Services, RMRA Major Pavement Rehabilitation FY19-20 Project, Chula Vista, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2023 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm RE Services provided construction management services for the Citywide Slurry Seal and Asphalt Concrete maintenance project.
The work involved performing pavement seal road resurfacing on 130 road segments in the Supervisorial Districts 1, 2, and 5 of the unincorporated areas of San Diego County. Additional scopes identified on the project included localized pavement repair (digouts), crack filling, utility adjustments, and pavement delineation. Mr. Medina served as Inspector and his daily responsibilities included documenting construction progress in a daily report, measurement and payment of quantities for processing Q-Sheets, coordinating quality control and assurance with Contractor and testers, coordinating unforeseen conditions with the resident engineer and City staff, public relations with residents, and change controls. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of San Diego On-Call CM Services, FY 2021-2022 Road Maintenance Project Asphalt Concrete Overlay – East, Lakeside, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2023 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Medina served as the General Foreman on the County of San Diego's $12.5 Mil AC Maintenance Project. Mr. Medina managed contractor and subcontractor staff and effectively collaborated with a team of 3 inspectors and Resident Engineer to prosecute field activities including quantity measurement and payment, Q-Sheets, managing quality control including testing coordination and non-conformance activities, and coordinating Extra Work including unforeseen conditions with the resident engineer and County staff, public relations with residents, and change controls.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 316
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Chrestina Mansoor, EIT, QSP, CESSWI Outreach / Office Engineer / Support Civil Inspector - Prevailing Wage
a. TOTAL b. WITH CURRENT FIRM
5 1.5
15. FIRM NAME AND LOCATION (City and State)
Reddy Engineering Services, Inc. (San Diego, CA)
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) B.S., Civil Engineering and Political Science, San Diego State University (2020)
EIT #171180, QSP #29069
CESSWI, CA #11230
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Mansoor has contributed significantly to team projects working closely with contractors, design engineers, traffic engineers, as well as various other stakeholders. Throughout her time at the County of San Diego, she was recognized for her collaborative efforts and achievements through multiple departmental Outstanding Teamwork Awards. Ms. Mansoor has served as a resident engineer as well as an office engineer for the construction engineering section. Her duties include but are not limited to preparing annual reports (such as the Jurisdictional Runoff Management Report), responding to claims and Public Records Acts requests, reviewing and processing payments for all of the construction contracts in her section, overseeing the closeout of construction contracts, and managing construction records. She has excellent communication skills and a tenacious work ethic. She is proficient in MS Office, Primavera, SharpeSoft, ArcGIS, CMIS, Bluebeam, and Adobe Acrobat, and she has experience with Caltrans Standard Plans and Specifications, Caltrans Construction Manual, San Diego Regional Standard Drawings, County of San Diego Public Road Standards, and County of San Diego Design Standards. She completed the Resident Engineer Academy in 2021. Ms. Mansoor is a detail-oriented fast learner which allows her to be a flexible team player.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Encinitas CM&I Services, FY 2025-2026 Pavement Rehabilitation Overlay Project (CS26A), Encinitas, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Mansoor serves as the Resident Engineer / Construction Manager on the City of Encinitas $4.4M FY 2025-2025 Pavement Rehabilitation Project (CS26A). The project scope involves removal and replacement of pedestrian ramps (including stamped and colored concrete ramps), surface and full depth asphalt pavement repairs, roadway widening, crack sealing, milling asphalt pavements, asphalt overlays, slurry seals, reconstruction of traffic detector loops, installation of pavement striping and markings, and adjustment of manholes and valves. Ms. Mansoor’s duties include reviewing submittals, reviewing contractor’s Requests for Information (RFIs), reviewing schedules, issuing Weekly Statements of Working Days (WSWDs), preparing project pay estimates, conducting construction meetings, communicating with residents, and coordinating with various stakeholders to mitigate conflicts.
Ms. Mansoor oversees document and change controls, prepares Contract Change Orders (CCOs) and backup, and ensures project records are filed consistently using the Caltrans 63-category filing system. She also prepares Inspector Work Plans (IWPs) for the various items for work for quality control, outlining inspector duties and ensuring compliance with the contract requirements. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans D11 CM&I Services, SR-78 SHOPP Asset Management Project, Oceanside, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Mansoor served as the Assistant Office Engineer on the $102M State Route 78 Asset Management Project. In general, the project consisted of pavement rehabilitation, construction of ADA pedestrian ramps, highway safety improvements including concrete barriers and Midwest Guardrail System, drainage improvements, electrical improvements, and various irrigation and landscape improvements. As an Assistant Office Engineer, Chrestina was responsible for reviewing and tracking submittals, RFIs, and potential change orders. She also assisted with preparing independent cost estimates to negotiate Contract Change Orders, preparing Contract Change Orders, reviewing quantity sheets and progress pay estimates, and tracking contingency. She was also responsible for preparing the weekly progress meeting agenda and Weekly Statement of Working Days and reviewing Contractor Work Plans to coordinate work scheduled within various cities’ right-of-way.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 317
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-2 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The City of Encinitas CM&I Services, FY 2023-2024 Pavement Rehabilitation Overlay Project, Encinitas, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2025 2025
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Mansoor served as the Office Engineer / Lead Inspector on the City of Encinitas $3.6M FY 2023-2024 Pavement Rehabilitation Overlay Project CS24A. The project scope included but was not limited to surface and full depth repairs, crack sealing, milling asphalt pavements, asphalt overlays, removal and replacement of concrete ramps to comply with ADA guidelines, reconstruction of traffic detector loops, installation of pavement striping and markings, and adjustment of manholes and valves. Ms. Mansoor performed a multitude of tasks including field inspections, conducting biweekly construction meetings, preparing daily agreed upon quantity sheets, processing monthly pay estimates, drafting Field Orders (FOs) and Contract Change Orders (CCOs), tracking extra work at force account, reviewing submittals, reviewing contractor’s Requests for Information (RFIs), reviewing schedules, issuing Weekly Statements of Working Days (WSWDs), communicating with residents, and coordinating with various stakeholders. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ammunition Road and West Alvarado Road Sidewalk Improvement, Fallbrook, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm When the Resident Engineer of the Ammunition Road and West Alvarado Road Sidewalk Improvement project left the Construction Engineering team, Ms. Mansoor, who was serving as the Construction Engineering Section Office Engineer at the time, stepped in to serve as the Resident Engineer for the project. The project involved installing sidewalk, driveway connections, and retaining walls where the contractor encountered a deteriorating stormwater pipe during the excavations that needed to be replaced. Hence, the project had many changes, but Ms. Mansoor quickly familiarized herself with the project.
She performed field inspections, helped the contractor to correct stormwater pollution prevention deficiencies, and responded to outstanding Requests for Information (RFIs). In addition, she established communication with various stakeholders and collaborated with the contractor to address outstanding issues as well as issued payment for extra work by preparing Contract Change Orders (CCOs) and Field Orders (FOs). She tracked time and contingency and worked closely with the contractor to complete the project in a timely manner.
e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED West Aviation Road and Lakeshore Road Sidewalk Improvements, Fallbrook and Lakeside, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Mansoor served as the Resident Engineer on the West Aviation Road and Lakeshore Road Sidewalk Improvements Community Development Block Grant (CDBG) project. The project involved installing sidewalk, curb ramps, and connecting to existing driveways as well as installing a gravity wall. Ms. Mansoor performed field inspections, conducted weekly construction meetings, and negotiated several change orders due to the design changes that arose throughout the project. She responded to various business owners’ concerns as the original design reduced their driveway widths. In coordination with the project manager, she was able to perform field design changes to the curb grades to increase the owners’ driveway widths to match existing conditions while complying with the ADA guidelines. In addition, she worked closely with the utility coordinator, property owners, and design team to install a gravity wall as part of the project where there was no previous potholing data which required field adjusting the depth and base width of the wall. This contract combined two separate projects in two different locations in the same grant which made budgeting a little challenging; however, Ms. Mansoor worked closely with the project manager to stay within the project budget despite all the changes made.
f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Wilma Street Sidewalk Improvement, Lincoln Acres, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Mansoor served as the Resident Engineer for the Sweetwater Road Pathway Improvements with the County of San Diego. The project involved diverting surface runoff to stormwater pipes and improving the pedestrian pathway. The project helped reduce rill formation as well as improved the safety of the pathway by adding fencing along the pathway to separate vehicular and pedestrian traffic. She performed field inspections and administered the contract through completion. Ms. Mansoor’s role included but was not limited to reviewing submittals, responding to contractor’s Requests for Information (RFIs), communicating with residents, coordinating with various utility companies, tracking extra work at force account, executing field orders, preparing quantity sheets, and delivering project closeout documents such as the Final Construction Report (FCR).
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 318
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Michalle Beringhaus, PPM, CCM Project Controls Specialist (Labor Compliance)
a. TOTAL b. WITH CURRENT FIRM
28 <1
15. FIRM NAME AND LOCATION (City and State)
Reddy Engineering Services, Inc. (San Diego, CA)
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) B.S., Landscape Architecture, 1991 and 2006, Mesa State College
A.S., Nursing LPN, 1993, Saddleback College
Project Management Institute (PMI) Certified Project
Management Professional (PMP), No. 2931105
Construction Management Association of America (CMAA)
Certified Construction Manager (CCM), No. 29230
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Michalle Beringhaus has over 20 years of experience in project controls, contract administration, and labor compliance for complex public works programs. She specializes in certified payroll review, prevailing wage monitoring, labor compliance audits, project documentation, cost tracking, fee estimates, staffing plans, earned-value analysis, and schedule/cost reporting. Her experience includes working with SANDAG’s LCP Tracker, the City of San Diego’s PRISM system, and the California DIR eCPR system to identify discrepancies, monitor compliance, and support resolution of potential violations.
Ms. Beringhaus supports project managers and program managers with labor compliance documentation, contract administration, cost proposals, backlog projections, resource planning, and project performance reporting. She also coordinates with resident engineers, agency staff, contractors, and legal teams to uphold contract requirements, maintain accurate project records, and support fiscal accountability from project initiation through closeout.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Chula Vista On-call Construction Management Services, Various Projects, Chula Vista, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Beringhaus provides Labor Compliance Administration for the City of Chula Vista on numerous projects for this asneeded construction management services contract. Ms. Beringhaus verifies compliance with the City’s standards and prevailing wage requirements by reviewing certified payroll records and submitted documentation for these contractors, and coordinates with the Resident Engineer regarding possible violations and discrepancies. KCS is providing construction management and inspection on a variety of capital improvement projects for the City, including street pavement rehabilitation, storm drain, sewer, and sewage pump station construction and rehabilitation; traffic signal modifications; street widenings; ADA curb ramp and sidewalk replacements; as well as signage and striping. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of San Diego West Mission Bay Drive Bridge, San Diego, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2023 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Labor Compliance Services Ms. Beringhaus provided Task Order Management and Labor Compliance services for this high-profile $110M City of San Diego bridge replacement project. West Mission Bay Drive is an important north-south arterial that serves an area of popular tourist sites, including Sea World, Pechanga Arena (formerly Valley View Casino Center/San Diego Sports Arena), and the Mission Bay resort area. Two new structures, which span the San Diego River, replace the previous, functionally obsolete structure to increase traffic capacity and provide upgraded bike facilities and pedestrian walkways. The structures feature post-tensioned concrete box girder superstructures, deep pile foundations, and unique architectural features constructed in stages to maintain open lanes of traffic and minimize impacts to the public. Ms. Beringhaus reviewed certified payroll records and submitted documentation, provided prevailing wage monitoring, and coordinated with the Resident Engineer regarding possible violations and discrepancies. Additionally, she managed and tracked the project certified payroll documents utilizing the City’s PRISM software.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 319
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-2 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Chula Vista On-call Construction Management Services, Major Pavement Rehabilitation FY 18/19 (STM0397), Chula Vista, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Beringhaus served as Labor Compliance Administrator for this $2.2M pavement rehabilitation project on 17 locations throughout the City’s streets. This project involved various types of asphalt concrete paving including leveling courses, overlays using conventional hot mix or rubberized hot mix asphalt, and asphalt rubber aggregate membrane chip seal. Other improvements included concrete curb and gutter, ADA (Americans with Disabilities Act) curb ramps, sidewalk, and stamped concrete median, asphalt concrete dike, installation of vehicle detection loops, and permanent thermoplastic and paint striping. Ms. Beringhaus verified compliance with the City’s standards and prevailing wage requirements by reviewing certified payroll records and submitted documentation for these contractors and coordinated with the Resident Engineer regarding possible violations and discrepancies.
d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED OCTA Laguna Niguel to San Juan Capistrano Passing Siding Project, Orange County, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Beringhaus provided Labor Compliance oversight services for this $30.8M passing siding project. The project consisted of 1.8 miles of new passing siding railroad track between the Laguna Niguel/Mission Viejo Metrolink station and Trabuco Creek in San Juan Capistrano. Ms. Beringhaus reviewed the consultant team’s certified payroll records and submitted documentation and overseed the prevailing wage scope of work being performed by a subconsultant team member. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SANDAG On-call Construction Management Services, Various Projects (Contracts 5001073 and 5007804), San Diego, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Beringhaus serves as a QA/QC I professional and also as the Assistant Task Order Manager for these as-needed construction management services contracts. Contract 5001073 is complete and totaled nearly $35M worth of work. Contract 5007804 has a not-to-exceed value of $60M, of which the firm has encumbered $18M to date. Her responsibilities include assisting with the development of task orders including preparation of cost proposals and developing detailed staffing plans and costs-to-complete. Ms. Beringhaus coordinates with the subconsultant team members to develop subconsultant agreements and task orders. In addition, Ms. Beringhaus has proved instrumental in the development and hands-on use of an in-house customized web-based contract and task order management tool dubbed WoPr, a central interface to house all information related to task orders and contracts. Using this tool, Ms. Beringhaus efficiently prepares and maintains projections, uploads actual invoices, and generates a myriad of reports that are compiled into a monthly report. The system includes assigning funding sources and splits to each project; it also tracks expenditures and projections to assist managing the budgets of various funding sources. ROLE: Labor Compliance Services / Assistant Task Order Management Ms. Beringhaus provides Labor Compliance services and Assistant Task Order Management for this as-needed construction management services contract, worth nearly $24M covering San Diego County. Her responsibilities include reviewing the consultant team’s certified payroll and submitted documentation, preparing all necessary reports, and assisting with the development of task orders including preparation of cost proposals, development of detailed staffing plans, and costs-to-complete. Utilizing an in-house customized web-based contract and task order management tool dubbed WoPr, Ms. Beringhaus efficiently prepares and maintains projections, uploads actual invoices, and generates a myriad of reports that are compiled into a monthly report. Ms. Beringhaus coordinates with the subconsultant team members to develop subconsultant agreements and task orders.
f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans District 11 On-call Construction Management Services, Various Projects, San Diego, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Beringhaus provides Labor Compliance services and Assistant Task Order Management for this as-needed construction management services contract, worth nearly $24M covering San Diego County. Her responsibilities include reviewing the consultant team’s certified payroll and submitted documentation, preparing all necessary reports, and assisting with the development of task orders including preparation of cost proposals, development of detailed staffing plans, and costs-to-complete.
Utilizing an in-house customized web-based contract and task order management tool dubbed WoPr, Ms. Beringhaus efficiently prepares and maintains projections, uploads actual invoices, and generates a myriad of reports that are compiled into a monthly report. Ms. Beringhaus coordinates with the subconsultant team members to develop subconsultant agreements and task orders.
Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 320
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Amy Comte, CPESC, CESSWI, QSD/P, ToR Stormwater Inspector - Prevailing Wage (Optional)
a. TOTAL b. WITH CURRENT FIRM
24 2
15. FIRM NAME AND LOCATION (City and State)
Reddy Engineering Services, Inc. (San Diego, CA)
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BA, Geography - Spatial Technical Analysis, with
Certificates in Urban Planning and GIS, Cal State
University San Bernardino, CA, 2004
Qualified SWPPP Developer/Practitioner (QSD/P), No. 00034 Certified Professional in Erosion and Sediment Control, No. 3410 Certified Erosion Sediment and Storm Water Inspector, No. 0164 Trainer of Record Certificate for QSD/P Training Course, 06/30/2026 SCAQMD Dust Control
HAZWOPER 40 Hour
OSHA 30
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Not a former Caltrans employee.
Ms. Comte has worked 24 years in the construction industry with experience working on various infrastructure projects for multiple transportation agencies, counties, cities and Caltrans. She is familiar with Caltrans Standard Specifications and local stormwater standards and ordinances. Her experience includes water quality monitoring, site inspections, plan preparation and review, SMARTS data entry, sampling and analysis, and leading NPDES stormwater training sessions. She is a member of the California Storm Water Quality Association and is a Construction General Permit Trainer of Record. Ms.
Comte has facilitated the QSD/P training course requirements and various Best Management Practice (BMP) focused trainings for internal staff and clients. Training topics include National Pollutant Discharge Elimination System (NPDES) Regulations; Low Impact Development (LID); Project Planning and Risk Determination; SWPPP Implementation and Preparation; Erosion Process and Sediment Control; BMP Installation Details; Construction Site Monitoring Plans (CSMPs); Sampling and Analysis; Passive and Active Treatment; Inspection Requirements; Reporting; and Project Closeout.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SANDAG/NCTD, Batiquitos Lagoon Double Track, San Diego, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Stormwater Manager. Ms. Comte is providing project storm water management services on this risk level 2 designated federally funded project administered under Caltrans Standards. Duties included reviewing the project SWPPP and amendments for completeness and accuracy, conducting site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring the contractor complies with the 2022-0057 DWQ Construction General Permit, California Coastal Commission, United States Fish and Wildlife, Army Corp Nationwide Permit and Water Quality Certification. She is assisting the resident engineer by keeping regular correspondence with the contractor and attending meetings to discuss storm water regulations with the contractor to ensure compliance with the applicable permits and Contract Special Provisions requirements. Ms. Comte is assisting the CM staff by reviewing various submittals related proposed BMPs, SPCC plan and Beach Nourishment Plan. She is acting as the data submitter in SMARTS to assist the Legally Responsible Person with reporting and filing requirements.
Project Cost: $166 million; Performance Period: 08/2024 – Ongoing b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SBCTA, Mt Vernon Viaduct Project (San Bernardino, CA)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2026 2026
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Stormwater Manager. Ms. Comte is providing project storm water services on this risk level 1 designated federally funded project within the Union Pacific Rail Right of Way administered under Caltrans Standards. Duties included reviewing the project SWPPP and amendments for completeness and accuracy, conducting site inspections, weather monitoring, and ensuring the contractor complied with the Construction General Permit. Assists the resident engineer by keeping regular correspondence with the contractor and attending meetings to discuss storm water regulations with the contractor to ensure compliance with the Construction General Permit and Contract Special Provisions requirements. Assists office engineer staff by maintaining all components of Category 20. Acted as a data submitter in SMARTS to assist the agency with reporting and filing requirements. Successfully transitioned this project from the 2009 CGP to the 2022 CGP.
Project Cost: $230 million; Performance Period: 06/2024 – 03/2026 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 321
RE SERVICES | SOLICITATION # STANDARD FORM 330 (REV. 8/2016) | PAGE E-2 Caltrans District 43 (43A0409, 43A0366), On-Call Professional and Technical Stormwater Quality Assurance Services, Statewide, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2024 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Water Quality Compliance Monitor. Ms. Comte acted as an Independent Quality Assurance Inspector and provided services for the provision of site compliance reviews for construction projects, maintenance facilities, and maintenance activities throughout California within the Caltrans right-of-way. Construction site compliance field reviews of construction projects and construction activities were to determine whether stormwater management practices were being implemented as intended and that proper BMPs were installed and maintained. Reviews also included a compete Category 20 administration evaluation. She performed facility reviews for Caltrans Headquarters Maintenance that included maintenance operated facilities such as Commercial Vehicle Enforcement Facilities (CVEF), equipment shops, material storage areas and maintenance yards. These reviews reviewed drainage systems, material and waste storage, vehicle equipment storage and repair, spill control and treatment BMPs. Additional duties included providing consistency audits of the inspectors on this contract.
Project Cost: $5 million; $4 million; Performance Period: 07/2017 – 05/2024 d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SBCTA, SR-210 Lane Addition/Baseline, San Bernardino, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2024 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Stormwater Manager. This project consists of widening the SR-210. This project includes bridge widening over four waterways of which two were diverted to perform work requiring 401 Water Quality Certification, 404 Army Corp and Fish and Game 1600 permitting. Ms. Comte provided project storm water services on this risk level 2 project within the Caltrans Right of Way. Duties included reviewing the project SWPPP and amendments for completeness and accuracy, conducting site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring proper documentation and CEM forms were submitted. She assisted the resident engineer by keeping regular correspondence with the contractor and attending meetings to discuss storm water regulations with the contractor to ensure compliance with the Construction General Permit and Contract Special Provisions requirements. She participated in independent quality inspection reviews and provided report responses. Ms. Comte acted as a data submitter in SMARTS to assist the Legally Responsible Person with reporting and filing requirements.
Project Cost: $198.7 million; Performance Period: 11/2019 - 01/2024 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED RCTC, Placentia I-215 Interchange, Perris, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2024 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Stormwater Manager. Ms. Comte provided project storm water services on this risk level 1 designated project within the Caltrans right-of-way. Duties included reviewing the project SWPPP and amendments for completeness and accuracy, conducting site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring the contractor complied with the Construction General Permit. She assisted the resident engineer by keeping regular correspondence with the contractor and attending meetings to discuss storm water regulations with the contractor to ensure compliance with the Construction General Permit and Contract Special Provisions requirements. She participated independent quality inspection reviews and the 90% Construction to Maintenance walk. Ms. Comte acted as a data submitter in SMARTS to assist the Legally Responsible Person with reporting and filing requirements.
Project Cost: $42 million; Performance Period: 05/2021 – 01/2024 f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED TCA, 241/133 Toll Roads (Silverado Fire Toll Plazas), Irvine, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2023 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Stormwater Manager. Ms. Comte provided project storm water services on this risk level 1 designated project within the Caltrans right-of-way. Duties included reviewing the project SWPPP and amendments for completeness and accuracy, conducting site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring the contractor complied with the Construction General Permit. She assisted the resident engineer by keeping regular correspondence with the contractor and attending meetings to discuss storm water regulations with the contractor to ensure compliance with the Construction General Permit and Contract Special Provisions requirements. Ms. Comte also assisted the office engineer staff by maintaining all components of Category 20 and acted as a data submitter in SMARTS to assist the Legally Responsible Person with reporting and filing requirements.
Project Cost: $6 million; Performance Period: 003/2022 – 01/2023 Attachment 3
Item 4.i
July 21, 2026 City of Coronado Page 322
NINYO & MOORE, A SOCOTEC COMPANY
5710 Ruffin Road | San Diego, California 92123 | p. 858.576.1000 | www.ninyoandmoore.com June 16, 2026
Proposal No. 02SAN06-04046
Mr. Adriel Lara, PE
City of Coronado
1825 Strand Way
Coronado, California 92118
Subject: Proposal for Materials Testing Services
Street Preventative Maintenance FY 25/26
Various Streets in Coronado Cays and Coronado Village
Coronado, California
Dear Mr. Lara:
We are pleased to present this proposal to provide materials testing services during the Street Preventive Maintenance project for fiscal year 2025/2026. Based on the Notice Inviting Bids (NIB) dated May 28, 2026, the project consists of approximately 28,134 square feet (sf) (with a potential additive of another 17,304 sf) of asphalt “dig out” repairs, crack filling/sealing and slurry sealing approximately 2,911,355 sf of asphalt concrete (AC) paved roadways and parking lots in Coronado, California. The AC “dig out” repairs will consist of removal of the existing AC materials, as-needed subgrade preparation, and placement of new AC materials within various areas ranging in size from 4 feet by 4 feet up to 30 feet by 160 feet. The Special Provisions included with the NIB indicate that the AC “dig out” repairs will utilize Type III-C2 AC materials, and the slurry seal will consist of Type I emulsion-aggregate slurry (EAS).
Additional improvements may also include removal and replacement of non-structural concrete driveway aprons and curb-and-gutters, where needed. A contractor’s schedule was not available for review at the time of this proposal, however, per your email dated June 3, 2026, we understand the project has a 3-month duration with a tentative start date in late July 2026 to early August 2026.
SCOPE OF SERVICES
Based on our review of the NIB, our experience and services during previous fiscal year street maintenance projects, and discussions with you, we propose the following scope of services:
• Perform periodic geotechnical observation and testing during subgrade preparation. • Perform periodic observation and testing during AC paving at the dig-out repair areas. • Perform daily field sampling during placement of slurry seal that will include collection of samples of the stockpiled sand, slurry seal, and fabrication of specimens for wet track abrasion tests.
Attachment 4
Item 4.i
July 21, 2026 City of Coronado Page 323
NINYO & MOORE, A SOCOTEC COMPANY
Street Preventative Maintenance, Coronado, California | 02SAN06-04046 | June 16, 2026 2 • Perform weekly sampling of aggregates used for the Type I EAS. • Perform periodic sampling of non-structural concrete during driveway and/or curb-and-gutter placements. Our American Concrete Institute (ACI) technician will sample the fresh concrete material and measure its temperature, and slump, as well as cast one set of five concrete cylinders for the day’s placement.
• Perform laboratory testing of the soil materials exposed at subgrade elevation to evaluate the modified Proctor dry density and optimum moisture content relationship. • Perform laboratory testing of the AC materials to evaluate the Hveem stability and unit weight along with percent asphalt and gradation by extraction.
• Perform laboratory testing of the slurry seal materials, including aggregates. Laboratory testing is anticipated to include an evaluation of wet track abrasion, moisture content of the slurry, emulsion content of the slurry, aggregate gradation, sand equivalent, and oil content of the emulsion. • Perform laboratory testing to evaluate the compressive strength of the non-structural concrete samples.
• Prepare daily reports of sampling and laboratory summary reports of the testing of the samples.
Laboratory results will be forwarded electronically as the tests are completed. In the event that materials do not meet project specifications, the City Inspector will be notified by phone and test results emailed.
ASSUMPTIONS
This proposal has been prepared in accordance with the following assumptions:
• The project is subject to prevailing wage requirements. Our services will be performed under a Work Order as part of our on-call contract (25-PS-ES-973) which is subject to Prevailing Wage Determination SH-23-63-3-2024-2D. Upon awarding the project, the client will provide in writing, the Department of Industrial Relations (DIR) Project ID for the purposes of electronic certified payroll reporting (eCPR) and labor compliance.
• In preparation of this proposal, we have estimated quantities and durations for field services and laboratory testing for the slurry seal materials based on our similar services provided during the previous fiscal year street maintenance projects, which included:
• Onsite sampling of slurry seal materials will generally be performed in 4 hours during day shifts, Monday through Friday.
• We have assumed 20 working days for the slurry seal operations. • Two wet track abrasion samples will be fabricated for laboratory testing daily. • One bulk sample of the sand and/or aggregate will be sampled per week for laboratory analysis.
• Field observations during slurry seal placement will not be needed nor requested. • Concrete is not considered structural and special inspection will not be needed nor requested.
However, based on past experience, we assume the City will request samples of non-structural concrete for informational purposes.
Attachment 4
Item 4.i
July 21, 2026 City of Coronado Page 324
NINYO & MOORE, A SOCOTEC COMPANY
Street Preventative Maintenance, Coronado, California | 02SAN06-04046 | June 16, 2026 3 • Engineering services for evaluation of site conditions or retesting of failing test results are not within our scope of services and will be performed on an as-needed basis. • Daily reports and laboratory results will be provided to the City of Coronado for the project files and a separate final summary report will not be needed.
FEE
The materials testing services will be provided on a time-and-expense basis accrued in accordance with the requested 3.2 percent escalation to the Schedule of Fees in our Agreement for On-Call Professional Services (25-PS-ES-973) between the City of Coronado and Ninyo & Moore. Our proposed estimated fee for the materials testing services as described herein will be $48,083.20. A breakdown of these fees is presented in Table 1.
These estimated costs are based on our discussions and assumptions of the anticipated services and do not include stand-by time or costs associated with retesting or reinspecting materials that were found not to be in compliance with the project plans or specifications. Our services will depend on the construction schedule and the contractor’s operations. It should be noted that the performance of the contractor can substantially affect the duration of our services. Requested engineering and/or field and laboratory testing not within the specified scope of services or in excess of those presented in Table 1 will be provided, based on time and materials. Our fee does not include time to review drawings, preparation of construction specifications, meetings and other activities requested that are not presented in our estimated fee breakdown.
We look forward to working with you on this project. If the terms and conditions of the proposal meet with your approval, please forward a Work Order under our current on-call contract to initiate project activities.
Respectfully submitted,
NINYO & MOORE
Gabriel Smith, PE, GE
Senior Project Engineer
Gregory T. Farrand, PG, CEG
Principal Geologist
Kenneth H. Mansir, PE, GE
Principal Engineer
GS/JTK/GTF/KHM/mp
Attachments: Table 1 – Breakdown of Estimated Fee
Attachment 4
Item 4.i
July 21, 2026 City of Coronado Page 325
Senior Technician, Subgrade and Aggregate Base 40 hours @ $111.45 /hour 4,458.00 $ Senior Technician, Asphalt Concrete 40 hours @ $111.45 /hour 4,458.00 $ Senior Technician, Slurry Seal 80 hours @ $111.45 /hour 8,916.00 $ ACI Concrete Technician 12 hours @ $111.45 /hour 1,337.40 $ Technician, Sample Pick Up 4 hours @ $106.30 /hour 425.20 $ Subtotal $ 19,594.60
Proctor Density - D 1557 4 tests @ $220.00 /test 880.00 $ Hveem Stability and Unit Weight CTM or ASTM, CT 366 2 tests @ $225.00 /test 450.00 $ Extraction, % Asphalt, including Gradation, D 2172, CT 310 2 tests @ $250.00 /test 500.00 $ Slurry Wet Track Abrasion, ASTM D3910 40 tests @ $150.00 /test 6,000.00 $ Moisture Content, CT 370 40 tests @ $95.00 /test 3,800.00 $ Emulsion Content by Ignition 40 tests @ $150.00 /test 6,000.00 $ Sieve Analysis, Fine Aggregate (including wash), C 136 3 tests @ $145.00 /test 435.00 $ Sieve Analysis, Coarse Aggregate, C 136 3 tests @ $120.00 /test 360.00 $ Sand Equivalent, CT 217 3 tests @ $125.00 /test 375.00 $ Specific Gravity, D 854 3 tests @ $125.00 /test 375.00 $ Compression Tests, 6x12 Cylinder, C 39 8 tests @ $35.00 /test 280.00 $ Subtotal $ 19,455.00
Field Vehicle Usage 136 hours @ $15.00 /hour 2,040.00 $ Field Equipment Usage 136 hours @ $15.00 /hour 2,040.00 $ Subtotal $ 4,080.00
Principal Engineer/Geologist/Environmental Scientist 4 hours @ $201.24 /hour 804.96 $ Senior Project Engineer/Geologist/Environmental Scientist 20 hours @ $190.92 /hour 3,818.40 $ Geotechnical/Environmental/Assistant 4 hours @ $82.56 /hour 330.24 $ Subtotal $ 4,953.60
TOTAL ESTIMATED FEE $ 48,083.20
Table 1 – Breakdown of Estimated Fee
Project Management, Engineering Consultation, and Report Preparation Field Services
Laboratory Testing
Reimbursables
NINYO & MOORE, A SOCOTEC COMPANY
Street Preventative Maintenance, Coronado, California | 02SAN06-04046 | June 16, 2026 1 of 1 Attachment 4
Item 4.i
July 21, 2026 City of Coronado Page 326
CITY COUNCIL STAFF REPORT
Review of Three Accessory Dwelling Unit Floor Plans and Designs for the City’s Pre-Approved Accessory Dwelling Unit Program
RECOMMENDATION
Authorize the use of the pre-approved ADU plans as required by the State of California Department of Housing and Community Development.
BACKGROUND
The 2021-2029 Housing Element Update, adopted by the City Council on April 9, 2024, sets goals and programs for the City to accomplish within the Housing Element period. Program H-1.A states that the City shall establish pre-approved plans for accessory dwelling units (ADUs) and provide the plans on the City webpage. The purpose of this program is to provide applicants with the option of using ADU plans that have already been reviewed for compliance with the building code and have all required engineering completed, resulting in a more expedient and cost-efficient process.
On February 11, 2025 the City issued a request for qualifications to select a consultant to prepare the ADU plans offering three different floor plans with three different architectural styles for each model. The City entered into a contract with RRM Design Group (Consultant) on June 5, 2025 to complete the project in coordination with City staff.
On July 14, 2026 the City’s Planning and Design Commission reviewed the three proposed floor plans and designs. Overall, they had positive remarks about the efficiency of the floor plans and the architectural design options. They unanimously recommended that the City Council authorize the use of the pre-approved ADU plans and designs.
ANALYSIS
The consultant started the process by conducting an analysis of the various lot sizes and configurations found throughout the City, the City’s ADU permitting history to determine the size and types of ADUs most commonly sought by residents, and applicable development standards to produce conceptual ADU designs. City staff provided feedback and suggestions on how to refine their analysis and reviewed different iterations of proposed ADU layout and design. Local builders and designers were invited to a meeting on March 3, 2026 with the consultant and City staff to provide feedback on initial designs, and a representative of each trade was in attendance. At the conclusion of this process, three floor plans of varying sizes, each with three exterior styles, were developed with footprints/sizes to optimize the number of lots and configurations that single-story detached ADUs may be constructed on. The three ADU floor plans that were ultimately developed include:
Plan 1: 408 square feet, one bedroom, one bathroom, rectangular floor plan Plan 2: 462 square feet, one bedroom, one bathroom, square floor plan Plan 3: 679 square feet, two bedrooms, one bathroom, rectangular floor plan The three exterior design styles selected are intended to reflect existing home designs and aesthetic styles within the City (see renderings attached here as Attachment 1). Each of the design styles may be paired with any of the three floor plans listed above. Below are the three styles and the design elements that characterize each:
Item 4.j
July 21, 2026 City of Coronado Page 327
Coastal Cottage & Bungalow: Average to steep roof pitches, asphalt composite shingle or flat concrete tile roof, vertical and horizontal wood siding, decorative wood trim at windows and doors.
Spanish & Mediterranean: Light colored stucco, entry portal feature, decorative tile, arched openings, terra cotta clay or red concrete tiled roofs, low slope roofs, decorative venting elements.
Californian Contemporary/Modern: Light colored stucco, flat roofs, parapet or metal roofs, deep overhangs, metal fascia, wooden soffits, high contrast materials, high percentage of glazing.
Once pre-approved ADU plans are in place, property owners will be able to select a floor plan and design style that suits their lot and preferences. By using the pre-approved building plan sets, applicants will only need to submit a basic site plan to demonstrate compliance with setback and parking standards which will require minimal review by City staff. This will reduce costs and review time for the property owner.
Any paint or other color selection would not be regulated by City staff, allowing the applicant to personalize the unit while utilizing the approved materials. Applicants may deviate from the approved plan sets; however, additional review and costs may be required if changes are extensive to ensure compliance with building code standards.
Once the design and layouts are authorized for use by the City Council, the consultant will finalize building and engineering plans, with the goal of having pre-approved ADU plans available for property owners by the end summer.
FISCAL IMPACT
None
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
The development of pre-approved ADU plans is not considered a project under CEQA and is therefore exempt from environmental review.
PUBLIC NOTICE
No public notice is required.
ATTACHMENTS
1. Schematic package prepared by RRM Design Group
Submitted By: Community Development / Kirk Fatland
Item 4.j
July 21, 2026 City of Coronado Page 328
ACCESSORY DWELLING UNIT
ARCHITECTURAL DESIGN
PREPARED BY
RRM Design Group
SHEET INDEX
PLAN 1
A2 PLAN 1 | 1 BED / 1 BA | 408 SF
A3 PLAN 1 | PERSPECTIVE | COASTAL COTTAGE
A4 PLAN 1 | ELEVATIONS | COASTAL COTTAGE
A5 PLAN 1 | PERSPECTIVE | MEDITERRANEAN
A6 PLAN 1 | ELEVATIONS | MEDITERRANEAN
A7 PLAN 1 | PERSPECTIVE | CONTEMPORARY/MODERN
A8 PLAN 1 | ELEVATIONS | CONTEMPORARY/MODERN
PLAN 2
A9 PLAN 2 | 1 BED / 1 BA | 462 SF
A10 PLAN 2 | PERSPECTIVE | COASTAL COTTAGE
A11 PLAN 2 | ELEVATIONS | COASTAL COTTAGE
A12 PLAN 2 | PERSPECTIVE | MEDITERRANEAN
A13 PLAN 2 | ELEVATIONS | MEDITERRANEAN
A14 PLAN 2 | PERSPECTIVE | CONTEMPORARY/MODERN
A15 PLAN 2 | ELEVATIONS | CONTEMPORARY/MODERN
PLAN 3
A16 PLAN 3 | 2 BED / 1 BA | 679 SF
A17 PLAN 3 | PERSPECTIVE | COASTAL COTTAGE
A18 PLAN 3 | ELEVATIONS | COASTAL COTTAGE
A19 PLAN 3 | PERSPECTIVE | MEDITERRANEAN
A20 PLAN 3 | ELEVATIONS | MEDITERRANEAN
A21 PLAN 3 | PERSPECTIVE | CONTEMPORARY/MODERN
A22 PLAN 3 | ELEVATIONS | CONTEMPORARY/MODERN
PREPARED FOR
CITY OF CORONADO
CORONADO
CALIFORNIA
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 329
A2 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026
PROJECT #: 3797-01-PP25
CL
STUDIO/BED LIVING / KITCHEN
12' - 0"
34' - 0"
UNDERCOUNTER W/D
OPTIONAL WALL(S)
OPTIONAL CLOSET
BATH
COVERED FRONT
PORCH
A1.1 PLAN 1 - COASTAL COTTAGE
3797-01-PP25 APRIL 3, 2026
PRE-APPROVED ADUs
FOR THE CITY OF CORONADO
0' 2' 4' 8'
PLAN 1 | STUDIO / 1 BATH | 408 SF
CONTEMPORARY/MODERN 3 3/16" = 1'-0" (11 X 17 SHEET)
MEDITERRANEAN 2 3/16" = 1'-0" (11 X 17 SHEET)
PLAN 1 - COASTAL COTTAGE 1 1/4" = 1'-0" (11 X 17 SHEET) Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 330
A3 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 1 | PERSPECTIVE | COASTAL COTTAGE PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 331
A4 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 1 | ELEVATIONS | COASTAL COTTAGE PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
WOOD COLUMN
W/ STONE VENEER BASE
ASPHALT SHINGLE
ROOF
HORIZONTAL
LAP SIDING
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
12’-7”
12’-7”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
6:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
SHINGLE
SIDING
BAY
WINDOW
WOOD
PERGOLA
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 332
A5
CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 1 | PERSPECTIVE | MEDITERRANEAN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 333
A6 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 1 | ELEVATIONS | MEDITERRANEAN PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
DECORATIVE FAUX
ROOF VENT
S-TILE
ROOF
STUCCO
SIDING
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
13’-4”
13’-4”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
4:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
DECORATIVE
SPANISH TILE
DECORATIVE
ARBOR
WOOD
OUTRIGGERS
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 334
A7
CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 1 | PERSPECTIVE | CONTEMPORARY/MODERN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 335
A8 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026
PROJECT #: 3797-01-PP25
3:12 TYP.
TYP. OVERHANGS
EAVES - 6”
RAKES - 6”
ROOF SLOPE
PLAN 1 | ELEVATIONS | CONTEMPORARY/MODERN
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
13’-4”
13’-4”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
STANDING SEAM
METAL ROOF
STUCCO
WOOD OR ‘WOOD
LOOK’ SIDING WOOD COLUMN
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 336
A9 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026
PROJECT #: 3797-01-PP25
DW
KITCHEN / LIVING
UNDERCOUNTER W/D
OPTIONAL
DISHWASHER
LOCATION
22' - 0"
21' - 0"
COVERED FRONT
PORCH
OPTIONAL
PATIO DOOR
CL
WH
BED LINEN
BATH
OPTIONAL
WALL(S)
A2.1 PLAN 2 - COASTAL COTTAGE
3797-01-PP25 APRIL 3, 2026
PRE-APPROVED ADUs
FOR THE CITY OF CORONADO
0' 2' 4' 8'
PLAN 2 | 1 BED/STUDIO 1 BATH | 462 SF
CONTEMPORARY/MODERN 3 3/16" = 1'-0" (11 X 17 SHEET)
MEDITERRANEAN 2 3/16" = 1'-0" (11 X 17 SHEET)
PLAN 2 - COASTAL COTTAGE 1 1/4" = 1'-0" (11 X 17 SHEET) Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 337
A10 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | PERSPECTIVE | COASTAL COTTAGE PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 338
A11
CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | ELEVATIONS | COASTAL COTTAGE PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
ASPHALT SHINGLE
ROOF
HORIZONTAL
LAP SIDING
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
14’-10”
14’-10”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
6:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
SHINGLE
SIDING
WOOD
PERGOLA
WOOD COLUMN
W/ STONE VENEER BASE
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 339
A12 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | PERSPECTIVE | MEDITERRANEAN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 340
A13 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | ELEVATIONS | MEDITERRANEAN PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
DECORATIVE FAUX
ROOF VENT
S-TILE
ROOF
STUCCO
SIDING
DECORATIVE
SPANISH TILE
WOOD
OUTRIGGERS
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
14’-2”
14’-2”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
4:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 341
A14 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | PERSPECTIVE | CONTEMPORARY/MODERN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 342
A15
CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 2 | ELEVATIONS | CONTEMPORARY/MODERN PROJECT #: 3797-01-PP25 0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
13’-4”
13’-4”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
STANDING SEAM
METAL ROOF
3:12 TYP.
TYP. OVERHANGS
EAVES - 6”
RAKES - 6”
ROOF SLOPE
STUCCO WOOD OR ‘WOOD
LOOK’ SIDING
WOOD COLUMN
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 343
A16 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026
PROJECT #: 3797-01-PP25
DW
BEDROOM BEDROOM
HALLWAY
LAUNDRY
BATH
WH
LIVING / DINING
COVERED FRONT
PORCH
CLOSET CLOSET
QUEEN BED
OPTIONAL 3' X 5'
SHOWER OR TUB
KITCHEN
QUEEN BED
42' - 0"
14' - 8" 3' - 0"
CL
OPTIONAL WALL(S)
OPTIONAL CLOSET
17' - 8"
A3.1 PLAN 3 - COASTAL COTTAGE
3797-01-PP25 APRIL 3, 2026
PRE-APPROVED ADUs
FOR THE CITY OF CORONADO
0' 2' 4' 8'
PLAN 3 | 2 BED / 1 BATH | 679 SF
CONTEMPORARY/MODERN 3 3/16" = 1'-0" (11 X 17 SHEET)
MEDITERRANEAN 2 3/16" = 1'-0" (11 X 17 SHEET)
PLAN 3 - COASTAL COTTAGE 1 1/4" = 1'-0" (11 X 17 SHEET) Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 344
A17
CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | PERSPECTIVE | COASTAL COTTAGE PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 345
A18 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | ELEVATIONS | COASTAL COTTAGE PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
WOOD COLUMN
W/ STONE VENEER BASE
ASPHALT SHINGLE
ROOF
HORIZONTAL
LAP SIDING
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
14’-2”
14’-2”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
6:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
SHINGLE
SIDING
BAY
WINDOWS
WOOD
PERGOLA
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 346
A19 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | PERSPECTIVE | MEDITERRANEAN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 347
A20 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | ELEVATIONS | MEDITERRANEAN PROJECT #: 3797-01-PP25 FRONT ELEVATION 1 1/8" = 1'-0" (11 X 17 SHEET)
LEFT ELEVATION 2 1/8" = 1'-0" (11 X 17 SHEET)
REAR ELEVATION 3 1/8" = 1'-0" (11 X 17 SHEET)
RIGHT ELEVATION 4 1/8" = 1'-0" (11 X 17 SHEET)
DECORATIVE FAUX
ROOF VENT
WOOD
OUTRIGGERS
S-TILE
ROOF
STUCCO
SIDING
0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
14’-2”
14’-2”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
4:12 TYP.
TYP. OVERHANGS
EAVES - 12”
RAKES - 12”
ROOF SLOPE
DECORATIVE
SPANISH TILE
DECORATIVE
ARBOR
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 348
A21 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | PERSPECTIVE | CONTEMPORARY/MODERN PROJECT #: 3797-01-PP25 Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 349
A22 CITY OF CORONADO ADU PROTOTYPES
ISSUE DATE: 06/23/2026 PLAN 3 | ELEVATIONS | CONTEMPORARY/MODERN PROJECT #: 3797-01-PP25 0’-0”FF
0’-0”FF
FINISHED FLOOR
FINISHED FLOOR
9’-1”
9’-1”
PLATE HEIGHT
PLATE HEIGHT
MAX PROPOSED HEIGHT
MAX PROPOSED HEIGHT
16’-0”
16’-0”
14’-2”
14’-2”
MAX ALLOWABLE HEIGHT
MAX ALLOWABLE HEIGHT
STANDING SEAM
METAL ROOF
3:12 TYP.
TYP. OVERHANGS
EAVES - 6”
RAKES - 6”
ROOF SLOPE
STUCCO
WOOD OR ‘WOOD
WOOD COLUMN LOOK’ SIDING
Attachment 1
Item 4.j
July 21, 2026 City of Coronado Page 350
CITY COUNCIL STAFF REPORT
Public Hearing: Approval of a Resolution Adopting the Report of Sewer Service Charges to be Collected on the San Diego County Tax Roll for Fiscal Year 2026-27; and Directing the City Clerk to File the Report with the San Diego County Treasurer Tax-Collector
RECOMMENDATION
1. Hear and consider any protests or objections to the Fiscal Year 2026-27 Sewer Service Charge Report (Report), pursuant to Health and Safety Code Section 5473.2; and
2. Adopt a Resolution adopting the Fiscal Year 2026-27 Report and directing the City Clerk to file the Report with the San Diego County Treasurer Tax-Collector for collection on the Fiscal Year 2026-27 property tax bills, pursuant to Health and Safety Code Section 5473.4.
BACKGROUND
The City of Coronado collects sewer service charges through the San Diego County property tax roll pursuant to Health and Safety Code (HSC) Sections 5470 through 5473.11 and Coronado Municipal Code Chapter 60.08. Charges are levied annually against each parcel receiving sewer service and are collected together with general property taxes by the San Diego County Treasurer Tax-Collector and passed through to the City of Coronado.
On May 5, 2026, following a duly noticed Proposition 218 public hearing, the City Council adopted Resolution No. 2026-26 establishing updated sewer service charge rates effective July 1, 2026, for Fiscal Year (FY) 2026-27 through 2030-31. Separately, the City Council introduced Ordinance No. 2026-02, amending Coronado Municipal Code Section 60.08.050 to allow rate adjustments by resolution rather than ordinance. Ordinance No. 2026-02 was adopted at the May 19, 2026, regular meeting and became effective June 18, 2026.
In order for the City to collect sewer service charges via the tax roll, HSC Section 5473 requires the City to: 1) prepare a written report describing each parcel to receive sewer service and the amount of the charge for each parcel; 2) file the report with the City Clerk; 3) publish notice of the filing and the time at which the City Council will hear and consider objections or protests to the report; and 4) hear and consider any protests or objections before the City Council confirms the report by resolution. Following confirmation, the city files the adopted report with the San Diego County Treasurer Tax-Collector. The adopted report must be submitted by August 10, 2026, in order to be included in the tax roll.
ANALYSIS
The City’s consultant, in collaboration with staff, have prepared the FY 2026-27 Sewer Service Charge Report (Report) in accordance with HSC Section 5473. The Report identifies each parcel receiving sewer service and the annual sewer service charge to be levied for FY 2026-27. Charges are computed in conformance with the applicable land use classification for each parcel in conformance with the schedule of sewer service rates adopted by the City Council in Resolution No. 2026-26.
As part of the annual rate process, staff utilizes available information including but not limited to permit data, customer outreach, site visits, phone interviews and online research to assess appropriate land use classifications. Additionally, reevaluations of rates for parcels with mixed customer classifications are done by request or periodically to ensure each parcel is being charged appropriately. Classification Item 7.a
July 21, 2026 City of Coronado Page 351
corrections identified through the review process have been incorporated into the charges set forth in the Report.
The Report was filed with the City Clerk on July 8, 2026.
FISCAL IMPACT
Sewer service charges generate revenue for the Wastewater Enterprise Fund 610. The FY 2026-27 charges reflect the updated rate schedule adopted in Resolution No. 2026-26 and the corrected parcel classifications identified through the classification review. The projected total annual sewer service charge revenue for FY 2026-27 is approximately $8,015,939, based on current billed unit counts, at the new rates. Of that total, $5,738,819 is anticipated to be collected via the property tax roll.
ALTERNATIVE
The City Council may choose not to confirm the report or may direct staff to make corrections to specific parcel charges prior to confirmation and provide further direction to staff.
CALIFORNIA ENVIRONMENTAL QUALITY ACT
This action is not subject to CEQA.
PUBLIC NOTICE
Notice of the filing of the FY 2026-27 Sewer Service Charge Report and the time at which the City Council will hear and consider protests thereon was provided in accordance with Health and Safety Code Section 5473.1. A legal notice was published in the Coronado Eagle on July 8, 2026, and July 15, 2026.
ATTACHMENTS
1. Resolution No. 2026-50 – Resolution of the City Council of the City of Coronado Adopting the Report of Sewer Service Charges to be Collected on the Sand Diego County Tax Roll for FY 2026-27, and Directing the City Clerk to File the Report with the San Diego County Treasurer Tax-Collector
2. FY 2026-27 Sewer Service Charge Report– Parcel Listing with Charges Submitted By: Public Services and Engineering / Denise Johnson Item 7.a
July 21, 2026 City of Coronado Page 352
Attachment 1
RESOLUTION NO. 2026-50
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CORONADO, CALIFORNIA, ADOPTING THE REPORT OF
SEWER SERVICE CHARGES TO BE COLLECTED ON THE SAN
DIEGO COUNTY TAX ROLL FOR FISCAL YEAR 2026-27, AND
DIRECTING THE CITY CLERK TO FILE THE REPORT WITH THE
SAN DIEGO COUNTY TREASURER TAX-COLLECTOR
WHEREAS, the City of Coronado levies annual sewer service charges on parcels receiving sewer service through the San Diego County property tax roll, pursuant to Health and Safety Code Sections 5470 through 5473.11 and Coronado Municipal Code Chapter 60.08; and WHEREAS, on May 5, 2026, following a duly noticed Proposition 218 public hearing, the City Council adopted Resolution No. 2026-26 establishing the schedule of sewer service charge rates applicable for Fiscal Years 2026-27 through 2031-32; and WHEREAS, staff has prepared the Fiscal Year 2026-27 Sewer Service Charge Report (“the “Report”) in accordance with Health and Safety Code Section 5473, identifying each parcel within the City receiving sewer service and the annual sewer service charge to be levied, computed in conformance with the applicable land use classification for each parcel and the rate schedule adopted in Resolution No. 2026-26; and
WHEREAS, the Report was filed with the City Clerk on July 8, 2026, and notice of the filing and the time at which the City Council would hear and consider protests thereon was provided in accordance with Health and Safety Code Section 5473.1; and WHEREAS, on July 21, 2026, the City Council duly heard and considered all protests and objections pursuant to Health and Safety Code Section 5473.2, at which time all interested persons were afforded the opportunity to present written or oral objections to the Report; and WHEREAS, the City Council has heard and considered all protests and objections, if any, presented at or before the time stated in the notice; and WHEREAS, the City Council finds that the Report, as submitted, is in order and that the charges set forth therein are in conformance with the rate schedule established by Resolution No. 2026-26.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Coronado, California, as follows:
Section 1. The City Council hereby confirms and adopts the Fiscal Year 2026-27 Sewer Service Charge Report, as filed with the City Clerk on July 8, 2026, and approves the annual sewer service charges set forth therein to be levied against each parcel identified in the Report Item 7.a
July 21, 2026 City of Coronado Page 353
Attachment 1
for Fiscal Year 2026-27. This resolution is adopted in accordance with Health and Safety Code 5473; and, accordingly, the City Council hereby authorizes the sewer service charges identified in the Report to be collected on the tax roll by the County of San Diego.
Section 2. The City Clerk is hereby authorized and directed to file the adopted Report and the sewer service charges contained therein with the San Diego County Treasurer Tax-Collector for collection on the Fiscal Year 2026-27 property tax bills, in accordance with Health and Safety Code Section 5473.4. The charges shall be collected at the same time and in the same manner as general County taxes.
Section 3. This Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED by the City Council of the City of Coronado, California, at a regular meeting held on the twenty-first day of July 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________________
JOHN D. DUNCAN, Mayor of the
City of Coronado, California
ATTEST:
__________________________________
KELSEA HOLIAN, MMC, City Clerk of the
City of Coronado, California
Item 7.a
July 21, 2026 City of Coronado Page 354
City of Coronado N
Sewer Tax Roll Fiscal Year 2026-27.11
1 City of Coronado
Fiscal Year (FY) 2026-27 Sewer Service Charge Report
July 7, 2026
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 355
City of Coronado N 2
Sewer Tax Roll Fiscal Year 2026-27.11
TABLE OF CONTENTS
Section Page No.
Introduction 3
Engineers Report 4
Part A – Plans and Specifications 4
Part B – Estimate of Cost 4
Part C – Charge Calculation and Proposed Charges 6
Wastewater Treatment Costs/Pass Through Costs 6
Summary 7
Part D – Boundary Diagram 8
Appendix A – Detailed Assessments Sewer
This report has been prepared and submitted by Carmen C. Kasner Carmen C. Kasner, RCE 50856
Exp 9-30-2027
July 7, 2026
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 356
City of Coronado N 3
Sewer Tax Roll Fiscal Year 2026-27.11
INTRODUCTION
The City of Coronado (The City) provides sewer services to approximately 15,100 connections which include individual condominiums, apartment complexes, and houses, resulting in approximately 7,500 billings. The City collects sewer service charges through the San Diego County property tax roll pursuant to Health and Safety Code (HSC) Sections 5470 through 5473.11 and Coronado Municipal Code Chapters 60.08, for sewer service charges. Charges are levied against each parcel receiving sewer service and are collected together with general property taxes by the San Diego County Treasurer Tax-Collector and passed through to the City. Some property owners are hand-billed, including properties with flow-based charges, federal military properties and certain state and public agency properties.
This Engineer’s Report identifies, by parcel number, each parcel of real property receiving sewer services and the amount of sewer charges for each parcel for FY 2026-27, as required by the California Health and Safety Code Section 5473, et seq., pertaining to collection of sewer charges on the tax roll. The sewer report is included as Attachment A. The full report along with all attachment will be on file with the Office of the City Clerk and available on the City’s website on July 8, 2026. The Notice of Public Hearing was published by the City Clerk’s Office in accordance with Government Code Section 6066.
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 357
N 4
ENGINEER’S REPORT
City of Coronado
Sewer Tax Roll Fiscal Year 2026-27.11
This Engineer’s Report (“Report”) has been prepared for the City of Coronado for Fiscal Year 2026-27.
PART A – PLANS AND SPECIFICATIONS
The City of Coronado FY 2026-27 Wastewater Rate Study (Rate Study) prepared by the City’s rate consultant, Raftelis, dated February 16, 2026, was presented to the Coronado City Council in March of 2026. On May 5, 2026, following a duly noticed Proposition 218 hearing, the City Council approved the rate recommendations, effective July 1, 2026. The Rate Study projected costs and revenue needs for the five-year period of FY 2026-27 through FY 2030-
31. The Rate Study identified anticipated increases in expenses which included details on the services, improvements, and activities to be funded by the sewer service charges within the City as well as the need to increase sewer service revenues across the five-year term.
PART B – ESTIMATE OF COSTS
The following table summarizes the five-year rate plan adopted by the City Council May 5, 2026, effective July 1, 2026, for the FY 2026-27 timeframe. The rate adjustment schedule is commensurate with projected Regional Wastewater treatment cost increases and local operational and capital improvements needed and included analysis of the strength of flows contributing to costs and applied those costs proportionately. The cost of wastewater collection, transportation and treatment have increased dramatically in recent years, and the forecast is for costs to continue to increase in the coming years.
This report only covers properties that are placed on the Tax roll. These are lines 1-8 in Table 1 and do not include properties receiving hand bills nor ones that are flow based.
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 358
N 5
ENGINEER’S REPORT
City of Coronado
Sewer Tax Roll Fiscal Year 2026-27.11
Table 1 - City of Coronado Sewer Services Rates for
Fiscal Years 2026-27 through 2030-31
Line Customer Class Current FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Flat Rates (Monthly)
1 Single Family Unit (SFU) $48.75 $55.48 $60.20 $65.31 $70.86 $76.89 2 Multi-family Unit (MFU)
(per unit) $39.00 $26.70 $28.97 $31.43 $34.10 $37.00
3 Hotel (per room) $19.72 $20.56 $22.31 $24.20 $26.26 $28.49 4 Commercial (per
account) $58.94 $99.32 $107.77 $116.93 $126.86 $137.65
5 Small Restaurant (up to
50 seats) $44.73 $89.65 $97.27 $105.54 $114.51 $124.24
6 Medium Restaurant (51
to 150 seats) $203.21 $199.05 $215.97 $234.32 $254.24 $275.85 7 Large Restaurant (150 or
more seats) $616.62 $731.52 $793.70 $861.17 $934.36 $1,013.79 8 Boat Slips (per slip) $7.66 $12.81 $13.90 $15.08 $16.37 $17.76 Flow Based Rates (Per HCF)
9 Hotel Del Coronado
Laundry $5.38 $6.88 $7.46 $8.10 $8.79 $9.53
10 Laundry Lounge
(Laundromat) $4.52 $5.11 $5.55 $6.02 $6.53 $7.09
11 Port of San Diego $4.41 $5.33 $5.78 $6.27 $6.80 $7.38 12 School $4.46 $5.14 $5.58 $6.05 $6.56 $7.12
13 Hospital $4.69 $5.40 $5.85 $6.35 $6.89 $7.48
Navy Rates – Transportation (Per MG)
14 Navy NAB
(Transportation Only) $3,538.46 $5,131.17 $5,567.32 $6,040.55 $6,553.99 $7,111.08 15 NASNI Navy
(Transportation Only) $3,538.46 $5,131.17 $5,567.32 $6,040.55 $6,553.99 $7,111.08 16 Navy Coastal Campus
(Transportation Only) $3,538.46 $5,131.17 $5,567.32 $6,040.55 $6,553.99 $7,111.08 Navy Rates – Treatment (Per 1,000 Pounds)
17 Navy Coastal Campus
(BOD Strength) $337.02 $428.68 $465.12 $504.65 $547.55 $594.09 18 Navy Coastal Campus
(TSS Strength) $356.51 $640.43 $694.87 $753.93 $818.01 $887.54 Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 359
N 6
ENGINEER’S REPORT
City of Coronado
Sewer Tax Roll Fiscal Year 2026-27.11
PART C – CHARGE CALCULATION & PROPOSED CHARGES
Pursuant to Ordinance No. 2026-02 and Resolution No. 2026-26, the City Council adopted a five-year sewer service fee rate adjustment schedule commensurate with projected Regional Wastewater treatment cost increases and elected to have sewer service charges collected on the tax roll for the majority of its customers.
The City of Coronado sewer services fees for residential and multi-family customers are applied as monthly flat rates for the customer classifications listed in lines 1 through 8 in Table 1. For customers listed on lines 11 through 18 in Table 1, the charges are variable and based on water consumption and the strength of the sewage they generate (rated as low, medium low, medium, medium high or high) are not placed on the tax roll but billed directly by the City’s Public Services and Engineering Department.
The revenue will be incorporated into the FY 2026-27 budget.
Wastewater Treatment Costs/Pass Through Costs
The costs of wastewater collection, transportation and treatment have increased in recent years and the forecast is for costs to continue to increase in the coming years. The City of Coronado is a member of the Metro Wastewater Joint Powers Association (Metro JPA), a twelve-member agency, which uses the City of San Diego treatment facilities, at the Point Loma Treatment Plant located in Point Loma, San Diego and the North City Treatment Plant in the Miramar area, and the Transbay pumps station to treat their wastewater.
The Metro JPA shares the cost of the operation and maintenance of this plant and related infrastructure with the City of San Diego. The City of San Diego is implementing the Pure Water Program with projects around the North City Treatment plant, which also requires some cost sharing for the infrastructure associated with the treatment of the wastewater generated from the JPA. The City is closely monitoring the actual impact on treatment costs as the Pure Water Program costs become more certain.
The City does have the authority by State statute, the option to pass through any increases from other agencies with any annual billing (such as treatment by the City of San Diego). For the FY 2026-27 tax roll billing, there is no proposed pass-through increase required.
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 360
N 7
ENGINEER’S REPORT
City of Coronado
Sewer Tax Roll Fiscal Year 2026-27.11
Summary
Below is a summary of the billings included in Appendix A:
Total on Tax Roll
FY 2026-27 Total Sewer Billing $5,783,818.56
Number of accounts 7,559
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 361
City of Coronado N
Sewer Tax Roll Fiscal Year 2026-27.11
8 ENGINEER’S REPORT
PART D – BOUNDARY DIAGRAM
Below is a diagram showing the exterior boundaries of the territory within the City of Coronado subject to annual sewer services charges, which is coterminous with the boundaries of the City of Coronado. Parcel identification, the lines and dimensions of each lot, parcel, and subdivision of land within proposed sewer services boundary correspond to the San Diego County Assessor's Parcel Maps for said parcels as they existed at the time this Report was prepared and shall include all subsequent subdivisions, lot-line adjustments or parcel changes therein. Reference is hereby made to the San Diego County Assessor's maps for a detailed description of the lines and dimensions of each lot and parcel of land within the City of Coronado and subject to the proposed annual sewer services charges to be levied on behalf of the City.
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 362
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-020-01-00 $665.76 536-500-15-00 $665.76 537-690-15-05 $320.40 536-020-02-00 $665.76 536-500-16-00 $665.76 537-690-15-06 $320.40 536-020-03-00 $665.76 536-500-17-00 $665.76 537-690-15-07 $320.40 536-020-04-00 $665.76 536-500-18-00 $665.76 537-690-15-08 $320.40 536-020-05-00 $665.76 536-500-19-00 $665.76 537-690-15-09 $320.40 536-020-06-00 $665.76 536-500-20-00 $665.76 537-690-15-10 $320.40 536-020-07-00 $986.16 536-500-22-00 $665.76 537-690-15-11 $320.40 536-020-08-00 $665.76 536-500-23-00 $665.76 537-690-15-12 $320.40 536-030-01-00 $665.76 536-500-24-00 $986.16 537-690-15-13 $320.40 536-030-02-00 $665.76 536-500-25-00 $665.76 537-690-15-14 $320.40 536-030-03-00 $665.76 536-500-26-00 $665.76 537-690-15-15 $320.40 536-030-04-00 $665.76 536-500-27-00 $665.76 537-690-15-16 $320.40 536-030-05-00 $665.76 536-500-30-00 $665.76 537-690-15-17 $320.40 536-030-06-00 $665.76 536-500-31-00 $986.16 537-690-15-18 $320.40 536-030-07-00 $665.76 536-500-32-00 $986.16 537-690-15-19 $320.40 536-030-08-00 $665.76 536-500-33-00 $665.76 537-690-15-20 $320.40 536-030-09-00 $665.76 536-500-34-00 $665.76 537-690-15-21 $320.40 536-030-10-00 $665.76 537-021-01-00 $665.76 537-690-15-22 $320.40 536-030-11-00 $665.76 537-021-02-00 $665.76 537-690-15-23 $320.40 536-030-12-00 $665.76 537-021-03-00 $665.76 537-690-15-24 $320.40 536-030-15-00 $665.76 537-021-04-00 $665.76 537-690-15-25 $320.40 536-030-16-00 $665.76 537-021-05-00 $665.76 537-690-15-26 $320.40 536-030-17-00 $986.16 537-021-06-00 $665.76 537-690-15-27 $320.40 536-040-01-00 $665.76 537-021-07-00 $665.76 537-690-15-28 $320.40 536-040-02-00 $665.76 537-021-08-00 $665.76 537-690-15-29 $320.40 536-040-05-00 $665.76 537-021-09-00 $665.76 537-690-15-30 $320.40 536-040-06-00 $665.76 537-022-01-00 $665.76 537-690-15-31 $320.40 536-040-07-00 $665.76 537-022-02-00 $665.76 537-690-15-32 $320.40 536-040-08-00 $665.76 537-022-03-00 $665.76 537-690-15-33 $320.40 536-040-09-00 $665.76 537-022-04-00 $665.76 537-690-15-34 $320.40 536-040-10-00 $665.76 537-022-05-00 $665.76 537-690-15-35 $320.40 536-040-11-00 $665.76 537-022-06-00 $665.76 537-690-15-36 $320.40 536-040-13-00 $665.76 537-022-07-00 $665.76 537-690-15-37 $320.40 536-040-14-00 $665.76 537-022-08-00 $665.76 537-690-15-38 $320.40 536-040-21-00 $665.76 537-022-09-00 $665.76 537-690-15-39 $320.40 536-040-25-00 $665.76 537-022-10-00 $665.76 537-690-15-40 $320.40 536-040-26-00 $665.76 537-022-11-00 $665.76 537-690-15-42 $320.40 536-040-27-00 $665.76 537-022-12-00 $665.76 537-690-15-43 $320.40 536-040-28-00 $665.76 537-022-13-00 $665.76 537-690-15-44 $320.40 536-040-29-00 $665.76 537-022-14-00 $665.76 537-690-15-45 $320.40 536-040-30-00 $665.76 537-022-15-00 $665.76 537-690-15-46 $320.40 536-040-32-00 $665.76 537-022-16-00 $665.76 537-690-15-47 $320.40 536-040-34-00 $665.76 537-023-01-00 $665.76 537-690-15-48 $320.40 536-040-35-00 $665.76 537-023-02-00 $665.76 537-690-15-49 $320.40 536-040-36-00 $665.76 537-023-03-00 $1,331.52 537-690-15-51 $320.40 536-040-37-00 $665.76 537-023-04-00 $665.76 537-690-15-52 $320.40 536-040-38-00 $1,832.64 537-023-05-00 $665.76 537-690-15-53 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 363
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-050-02-00 $320.40 537-023-06-00 $665.76 537-690-15-54 $320.40 536-050-03-00 $320.40 537-023-07-00 $665.76 537-690-15-55 $320.40 536-050-04-00 $320.40 537-023-08-00 $665.76 537-690-15-56 $320.40 536-050-05-00 $320.40 537-023-09-00 $665.76 537-690-15-57 $320.40 536-050-06-00 $320.40 537-023-10-00 $665.76 537-690-15-58 $320.40 536-050-07-00 $320.40 537-023-11-00 $665.76 537-690-15-59 $320.40 536-050-08-00 $320.40 537-023-12-00 $665.76 537-690-15-60 $320.40 536-050-09-00 $320.40 537-023-13-00 $665.76 537-690-15-61 $320.40 536-050-10-00 $320.40 537-023-14-00 $665.76 537-690-15-62 $320.40 536-050-11-00 $320.40 537-023-15-00 $665.76 537-690-15-63 $320.40 536-061-01-00 $665.76 537-023-16-00 $665.76 537-690-15-64 $320.40 536-061-02-00 $665.76 537-024-01-00 $665.76 537-690-15-65 $320.40 536-061-03-00 $665.76 537-024-02-00 $665.76 537-690-15-66 $320.40 536-061-04-00 $665.76 537-024-03-00 $665.76 537-690-15-67 $320.40 536-061-06-00 $1,331.52 537-024-04-00 $665.76 537-690-15-68 $320.40 536-061-07-00 $1,331.52 537-024-05-00 $665.76 537-690-15-69 $320.40 536-061-08-00 $665.76 537-024-06-00 $665.76 537-690-15-70 $320.40 536-061-09-00 $665.76 537-024-07-00 $665.76 537-690-15-71 $320.40 536-061-10-00 $665.76 537-024-08-00 $665.76 537-690-15-72 $320.40 536-061-11-00 $665.76 537-031-02-00 $665.76 537-690-15-73 $320.40 536-062-01-00 $665.76 537-031-03-00 $986.16 537-690-15-74 $320.40 536-062-02-00 $665.76 537-031-04-00 $665.76 537-690-15-75 $320.40 536-062-05-00 $1,331.52 537-031-05-00 $665.76 537-690-15-76 $320.40 536-062-06-00 $665.76 537-031-06-00 $665.76 537-690-15-77 $320.40 536-062-07-00 $665.76 537-031-07-00 $665.76 537-690-15-78 $320.40 536-062-08-00 $986.16 537-031-08-00 $665.76 537-690-15-79 $320.40 536-062-09-00 $665.76 537-031-09-00 $665.76 537-690-15-80 $320.40 536-062-10-00 $665.76 537-032-01-00 $665.76 537-690-15-81 $320.40 536-062-11-00 $665.76 537-032-02-00 $665.76 537-690-16-01 $320.40 536-062-12-00 $665.76 537-032-03-00 $665.76 537-690-16-02 $320.40 536-062-13-00 $986.16 537-032-04-00 $665.76 537-690-16-03 $320.40 536-062-14-00 $665.76 537-032-05-00 $665.76 537-690-16-04 $320.40 536-062-15-00 $665.76 537-032-06-00 $665.76 537-690-16-05 $320.40 536-062-16-00 $1,331.52 537-032-07-00 $665.76 537-690-16-06 $320.40 536-062-17-00 $1,331.52 537-032-08-00 $986.16 537-690-16-07 $320.40 536-062-18-00 $1,331.52 537-032-09-00 $665.76 537-690-16-08 $320.40 536-062-19-00 $665.76 537-032-10-00 $665.76 537-690-16-09 $320.40 536-062-20-00 $665.76 537-032-11-00 $665.76 537-690-16-10 $320.40 536-062-21-00 $665.76 537-032-12-00 $665.76 537-690-16-11 $320.40 536-062-23-00 $665.76 537-032-13-00 $986.16 537-690-16-12 $320.40 536-062-24-00 $665.76 537-032-14-00 $665.76 537-690-16-13 $320.40 536-062-25-00 $665.76 537-033-01-00 $665.76 537-690-16-14 $320.40 536-062-28-00 $665.76 537-033-02-00 $665.76 537-690-16-15 $320.40 536-062-29-00 $1,306.56 537-033-03-00 $665.76 537-690-16-16 $320.40 536-062-32-00 $665.76 537-033-04-00 $665.76 537-690-16-17 $320.40 536-062-33-00 $665.76 537-033-05-00 $665.76 537-690-16-18 $320.40 536-062-34-00 $665.76 537-033-06-00 $665.76 537-690-16-19 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 364
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-062-35-00 $665.76 537-033-07-00 $665.76 537-690-16-20 $320.40 536-063-01-00 $665.76 537-033-08-00 $665.76 537-690-16-21 $320.40 536-063-02-00 $665.76 537-033-09-00 $986.16 537-690-16-22 $320.40 536-063-04-00 $665.76 537-033-10-00 $986.16 537-690-16-23 $320.40 536-063-06-00 $665.76 537-033-11-00 $665.76 537-690-16-24 $320.40 536-063-09-00 $986.16 537-033-12-00 $665.76 537-690-16-25 $320.40 536-063-10-00 $665.76 537-033-13-00 $665.76 537-690-16-26 $320.40 536-063-12-00 $665.76 537-033-14-00 $665.76 537-690-16-27 $320.40 536-063-13-00 $665.76 537-034-01-00 $665.76 537-690-16-28 $320.40 536-071-01-00 $665.76 537-034-02-00 $665.76 537-690-16-29 $320.40 536-071-02-00 $665.76 537-034-03-00 $665.76 537-690-16-30 $320.40 536-071-03-00 $665.76 537-034-04-00 $665.76 537-690-16-31 $320.40 536-071-04-00 $665.76 537-034-05-00 $665.76 537-690-16-32 $320.40 536-071-05-00 $665.76 537-034-06-00 $665.76 537-690-16-33 $320.40 536-071-06-00 $665.76 537-034-07-00 $665.76 537-690-16-34 $320.40 536-071-07-00 $665.76 537-041-01-00 $665.76 537-690-16-35 $320.40 536-071-08-00 $665.76 537-041-02-00 $665.76 537-690-16-36 $320.40 536-071-10-00 $665.76 537-041-03-00 $665.76 537-690-16-37 $320.40 536-071-11-00 $986.16 537-041-04-00 $665.76 537-690-16-38 $320.40 536-071-12-00 $665.76 537-041-05-00 $665.76 537-690-16-39 $320.40 536-071-13-00 $640.80 537-042-01-00 $665.76 537-690-16-40 $320.40 536-071-14-00 $665.76 537-042-02-00 $665.76 537-690-16-41 $320.40 536-071-15-00 $665.76 537-042-03-00 $665.76 537-690-16-42 $320.40 536-071-16-00 $665.76 537-042-04-00 $665.76 537-690-16-43 $320.40 536-071-17-00 $986.16 537-042-05-00 $665.76 537-690-16-44 $320.40 536-071-18-00 $665.76 537-042-06-00 $665.76 537-690-16-45 $320.40 536-071-19-00 $665.76 537-042-07-00 $665.76 537-690-16-46 $320.40 536-071-20-00 $986.16 537-042-08-00 $665.76 537-690-16-48 $320.40 536-071-21-00 $665.76 537-042-09-00 $665.76 537-690-16-49 $320.40 536-071-22-00 $665.76 537-042-10-00 $665.76 537-690-16-50 $320.40 536-071-23-00 $665.76 537-042-11-00 $665.76 537-690-16-51 $320.40 536-071-24-00 $665.76 537-043-01-00 $665.76 537-690-16-52 $320.40 536-071-26-00 $665.76 537-043-02-00 $665.76 537-690-16-53 $320.40 536-071-27-00 $665.76 537-043-03-00 $665.76 537-690-16-54 $320.40 536-071-28-00 $665.76 537-043-04-00 $665.76 537-690-16-55 $320.40 536-072-01-00 $665.76 537-043-05-00 $665.76 537-690-16-56 $320.40 536-072-02-00 $665.76 537-043-06-00 $665.76 537-690-16-57 $320.40 536-072-03-00 $665.76 537-043-07-00 $665.76 537-690-16-58 $320.40 536-072-04-00 $986.16 537-043-08-00 $665.76 537-690-16-59 $320.40 536-072-05-00 $665.76 537-044-01-00 $665.76 537-690-16-60 $320.40 536-072-06-00 $986.16 537-044-02-00 $665.76 537-690-16-61 $320.40 536-072-07-00 $665.76 537-044-03-00 $665.76 537-690-16-62 $320.40 536-072-08-00 $986.16 537-044-04-00 $665.76 537-690-16-63 $320.40 536-072-09-00 $665.76 537-051-01-00 $665.76 537-690-16-64 $320.40 536-072-10-00 $665.76 537-051-02-00 $665.76 537-690-16-65 $320.40 536-072-11-00 $665.76 537-051-03-00 $986.16 537-690-16-66 $320.40 536-072-12-00 $665.76 537-051-04-00 $665.76 537-690-16-67 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 365
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-072-13-00 $665.76 537-051-05-00 $665.76 537-690-16-68 $320.40 536-072-14-00 $986.16 537-051-06-00 $665.76 537-690-16-69 $320.40 536-072-15-00 $986.16 537-051-07-00 $665.76 537-690-16-70 $320.40 536-072-16-00 $986.16 537-051-08-00 $665.76 537-690-17-10 $320.40 536-072-18-00 $986.16 537-051-09-00 $986.16 537-690-21-01 $320.40 536-072-19-00 $665.76 537-051-10-00 $665.76 537-690-21-02 $320.40 536-072-20-00 $665.76 537-051-14-00 $665.76 537-690-21-03 $320.40 536-072-23-00 $665.76 537-051-15-00 $986.16 537-690-21-04 $320.40 536-081-01-00 $665.76 537-051-16-00 $665.76 537-690-21-05 $320.40 536-081-02-00 $665.76 537-051-17-00 $665.76 537-690-21-06 $320.40 536-081-05-00 $665.76 537-051-18-00 $665.76 537-690-21-07 $320.40 536-081-06-00 $665.76 537-051-20-00 $986.16 537-690-21-08 $320.40 536-081-07-00 $986.16 537-051-21-00 $986.16 537-690-21-09 $320.40 536-081-08-00 $665.76 537-052-01-00 $665.76 537-690-21-10 $320.40 536-081-09-00 $986.16 537-052-02-00 $665.76 537-690-21-11 $320.40 536-081-10-00 $986.16 537-052-03-00 $665.76 537-690-21-12 $320.40 536-081-11-00 $665.76 537-052-04-00 $665.76 537-690-21-13 $320.40 536-081-12-00 $665.76 537-052-05-00 $986.16 537-690-21-14 $320.40 536-081-13-00 $665.76 537-052-06-00 $1,331.52 537-690-21-15 $320.40 536-081-14-00 $986.16 537-052-07-00 $665.76 537-690-21-16 $320.40 536-081-15-00 $986.16 537-052-08-00 $665.76 537-690-21-17 $320.40 536-081-16-00 $1,331.52 537-052-09-00 $986.16 537-690-21-18 $320.40 536-081-17-00 $986.16 537-052-10-00 $665.76 537-690-21-19 $320.40 536-081-18-00 $665.76 537-052-11-00 $986.16 537-690-21-20 $320.40 536-081-22-00 $665.76 537-052-12-00 $665.76 537-690-21-21 $320.40 536-081-24-00 $665.76 537-052-13-00 $665.76 537-690-21-22 $320.40 536-081-25-00 $665.76 537-052-14-00 $665.76 537-690-21-23 $320.40 536-081-29-00 $665.76 537-052-15-00 $665.76 537-690-21-24 $320.40 536-081-31-00 $665.76 537-052-16-00 $986.16 537-690-21-25 $320.40 536-081-32-00 $665.76 537-052-17-00 $665.76 537-690-21-26 $320.40 536-081-33-00 $1,306.56 537-052-18-00 $986.16 537-690-21-27 $320.40 536-082-01-00 $665.76 537-052-19-00 $986.16 537-690-21-28 $320.40 536-082-02-00 $665.76 537-052-20-00 $665.76 537-690-21-29 $320.40 536-082-03-00 $986.16 537-052-21-00 $665.76 537-690-21-30 $320.40 536-082-04-00 $665.76 537-052-22-00 $1,306.56 537-690-21-31 $320.40 536-082-05-00 $665.76 537-052-24-00 $665.76 537-690-21-32 $320.40 536-082-06-00 $665.76 537-052-25-00 $665.76 537-690-21-33 $320.40 536-082-07-00 $665.76 537-052-26-00 $665.76 537-690-21-34 $320.40 536-082-08-00 $665.76 537-052-27-00 $665.76 537-690-21-35 $320.40 536-082-09-00 $665.76 537-052-28-00 $665.76 537-690-21-36 $320.40 536-082-10-00 $665.76 537-052-29-00 $665.76 537-690-21-37 $320.40 536-082-11-00 $665.76 537-061-01-00 $665.76 537-690-21-38 $320.40 536-082-12-00 $665.76 537-061-02-00 $665.76 537-690-21-39 $320.40 536-082-13-00 $665.76 537-061-03-00 $986.16 537-690-21-40 $320.40 536-082-14-00 $665.76 537-061-04-00 $665.76 537-690-21-41 $320.40 536-082-15-00 $665.76 537-061-05-00 $665.76 537-690-21-42 $320.40 536-082-17-00 $665.76 537-061-06-00 $665.76 537-690-21-43 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 366
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-082-18-00 $665.76 537-061-07-00 $986.16 537-690-21-44 $320.40 536-091-01-00 $665.76 537-061-08-00 $665.76 537-690-21-45 $320.40 536-091-02-00 $665.76 537-061-09-00 $665.76 537-690-21-46 $320.40 536-091-03-00 $1,306.56 537-061-10-00 $665.76 537-690-21-47 $320.40 536-091-05-00 $665.76 537-061-11-00 $665.76 537-690-21-48 $320.40 536-091-06-00 $665.76 537-061-12-00 $665.76 537-690-21-49 $320.40 536-091-07-00 $986.16 537-061-13-00 $665.76 537-690-21-50 $320.40 536-091-08-00 $665.76 537-061-14-00 $665.76 537-690-21-51 $320.40 536-091-09-00 $1,331.52 537-061-15-00 $665.76 537-690-21-52 $320.40 536-091-10-00 $665.76 537-061-16-00 $665.76 537-690-21-53 $320.40 536-091-11-00 $986.16 537-061-17-00 $665.76 537-690-21-54 $320.40 536-091-12-00 $665.76 537-061-18-00 $665.76 537-690-21-55 $320.40 536-091-13-00 $665.76 537-061-19-00 $986.16 537-690-21-56 $320.40 536-091-14-00 $665.76 537-061-20-00 $665.76 537-690-21-57 $320.40 536-091-15-00 $665.76 537-061-21-00 $986.16 537-690-21-58 $320.40 536-091-16-00 $1,281.60 537-061-22-00 $665.76 537-690-21-59 $320.40 536-091-17-00 $665.76 537-061-23-00 $986.16 537-690-21-60 $320.40 536-091-18-00 $665.76 537-061-24-00 $986.16 537-690-21-61 $320.40 536-091-19-00 $1,281.60 537-061-25-00 $986.16 537-690-21-62 $320.40 536-091-20-00 $665.76 537-061-26-00 $665.76 537-690-21-63 $320.40 536-091-21-00 $665.76 537-061-27-00 $665.76 537-690-21-64 $320.40 536-091-22-00 $1,306.56 537-061-28-00 $665.76 537-690-21-65 $320.40 536-091-23-00 $665.76 537-062-02-00 $665.76 537-690-21-66 $320.40 536-091-24-00 $665.76 537-062-03-00 $665.76 537-690-21-67 $320.40 536-091-25-00 $986.16 537-062-04-00 $665.76 537-690-21-68 $320.40 536-091-26-00 $665.76 537-062-05-00 $665.76 537-690-21-69 $320.40 536-091-27-00 $665.76 537-062-07-00 $665.76 537-690-21-70 $320.40 536-092-05-00 $665.76 537-062-08-00 $665.76 537-690-21-71 $320.40 536-092-06-00 $1,281.60 537-062-10-00 $665.76 537-690-21-72 $320.40 536-092-07-00 $2,563.20 537-062-11-00 $665.76 537-690-21-73 $320.40 536-092-12-00 $1,191.84 537-062-12-00 $665.76 537-690-21-74 $320.40 536-092-13-00 $1,075.80 537-062-13-00 $665.76 537-690-21-75 $320.40 536-092-18-00 $665.76 537-062-14-00 $665.76 537-690-21-76 $320.40 536-092-19-00 $1,191.84 537-062-15-00 $665.76 537-690-21-77 $320.40 536-092-20-00 $665.76 537-062-16-00 $665.76 537-690-21-78 $320.40 536-092-21-00 $1,191.84 537-062-17-00 $665.76 537-690-22-01 $320.40 536-092-22-00 $1,075.80 537-062-18-00 $665.76 537-690-22-02 $320.40 536-092-23-00 $8,778.24 537-062-19-00 $1,997.28 537-690-22-03 $320.40 536-092-24-00 $4,777.20 537-062-20-00 $1,602.00 537-690-22-04 $320.40 536-092-25-00 $1,512.24 537-062-21-00 $640.80 537-690-22-05 $320.40 536-092-29-00 $8,778.24 537-062-22-01 $665.76 537-690-22-06 $320.40 536-092-30-01 $320.40 537-062-22-02 $665.76 537-690-22-07 $320.40 536-092-30-02 $320.40 537-062-25-00 $3,524.40 537-690-22-08 $320.40 536-092-30-03 $320.40 537-062-26-01 $665.76 537-690-22-09 $320.40 536-092-31-00 $5,126.40 537-062-26-02 $665.76 537-690-22-10 $320.40 536-092-33-01 $1,512.24 537-062-28-00 $665.76 537-690-22-11 $320.40 536-092-33-02 $320.40 537-062-29-00 $665.76 537-690-22-12 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 367
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-092-33-03 $320.40 537-062-30-00 $665.76 537-690-22-13 $320.40 536-092-33-04 $320.40 537-062-31-01 $320.40 537-690-22-14 $320.40 536-092-34-00 $8,778.24 537-062-31-02 $320.40 537-690-22-15 $320.40 536-092-39-00 $665.76 537-062-31-03 $320.40 537-690-22-16 $320.40 536-092-40-00 $1,306.56 537-062-31-04 $320.40 537-690-22-17 $320.40 536-101-01-00 $5,964.12 537-062-31-05 $320.40 537-690-22-18 $320.40 536-101-02-00 $2,383.68 537-062-32-00 $665.76 537-690-22-19 $320.40 536-101-08-00 $3,844.80 537-062-33-00 $665.76 537-690-22-20 $320.40 536-101-09-00 $3,344.88 537-062-34-00 $665.76 537-690-22-21 $320.40 536-101-11-00 $1,832.64 537-062-35-00 $665.76 537-690-22-22 $320.40 536-101-18-01 $1,191.84 537-062-36-00 $665.76 537-690-22-23 $320.40 536-101-18-02 $1,191.84 537-062-37-01 $665.76 537-690-22-24 $320.40 536-101-18-03 $1,191.84 537-062-37-02 $665.76 537-690-22-25 $320.40 536-101-18-04 $320.40 537-062-38-00 $665.76 537-690-22-26 $320.40 536-101-18-05 $320.40 537-062-39-01 $665.76 537-690-22-27 $320.40 536-101-18-06 $320.40 537-062-39-02 $665.76 537-690-22-28 $320.40 536-101-18-07 $320.40 537-062-40-00 $665.76 537-690-22-29 $320.40 536-101-18-08 $320.40 537-062-41-00 $665.76 537-690-22-30 $320.40 536-101-18-09 $320.40 537-071-01-01 $320.40 537-690-22-31 $320.40 536-101-18-10 $320.40 537-071-01-02 $320.40 537-690-22-32 $320.40 536-101-22-00 $2,267.64 537-071-01-03 $320.40 537-690-22-33 $320.40 536-101-28-01 $320.40 537-071-01-04 $320.40 537-690-22-34 $320.40 536-101-28-02 $320.40 537-071-02-00 $1,306.56 537-690-22-35 $320.40 536-101-28-03 $320.40 537-071-05-01 $320.40 537-690-22-36 $320.40 536-101-28-04 $320.40 537-071-05-02 $320.40 537-690-22-37 $320.40 536-101-28-05 $320.40 537-071-05-03 $320.40 537-690-22-38 $320.40 536-101-28-06 $320.40 537-071-05-04 $320.40 537-690-22-39 $320.40 536-101-28-07 $320.40 537-071-06-00 $1,602.00 537-690-22-40 $320.40 536-101-28-08 $320.40 537-071-09-00 $986.16 537-690-22-41 $320.40 536-101-28-09 $320.40 537-071-10-00 $665.76 537-690-22-42 $320.40 536-101-28-10 $320.40 537-071-11-00 $2,563.20 537-690-22-43 $320.40 536-101-28-11 $320.40 537-071-12-00 $665.76 537-690-22-44 $320.40 536-101-28-12 $1,191.84 537-071-13-00 $4,165.20 537-690-22-45 $320.40 536-101-28-14 $320.40 537-071-16-00 $986.16 537-690-22-46 $320.40 536-101-28-15 $320.40 537-071-17-00 $665.76 537-690-22-47 $320.40 536-101-29-01 $1,191.84 537-071-18-01 $665.76 537-690-22-48 $320.40 536-101-29-02 $1,191.84 537-071-18-02 $665.76 537-690-22-49 $320.40 536-101-29-03 $1,191.84 537-071-18-03 $665.76 537-690-22-50 $320.40 536-101-29-04 $1,191.84 537-071-18-04 $665.76 537-690-22-51 $320.40 536-101-29-05 $1,191.84 537-071-19-01 $665.76 537-690-22-52 $320.40 536-101-29-06 $1,191.84 537-071-19-02 $665.76 537-690-22-53 $320.40 536-101-29-08 $320.40 537-071-19-03 $665.76 537-690-22-54 $320.40 536-101-29-09 $320.40 537-071-20-00 $1,281.60 537-690-22-55 $320.40 536-101-29-10 $320.40 537-071-21-01 $320.40 537-690-22-56 $320.40 536-101-29-11 $320.40 537-071-21-02 $320.40 537-690-22-57 $320.40 536-101-29-12 $320.40 537-071-21-03 $320.40 537-690-22-58 $320.40 536-101-29-13 $320.40 537-071-21-04 $320.40 537-690-22-59 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 368
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-101-29-14 $320.40 537-071-21-05 $320.40 537-690-22-60 $320.40 536-101-29-15 $320.40 537-071-22-01 $320.40 537-690-22-61 $320.40 536-101-29-16 $320.40 537-071-22-02 $320.40 537-690-22-62 $320.40 536-101-29-17 $320.40 537-071-22-03 $320.40 537-690-22-63 $320.40 536-101-29-18 $320.40 537-071-22-04 $320.40 537-690-22-64 $320.40 536-101-29-19 $320.40 537-071-22-05 $320.40 537-690-22-65 $320.40 536-101-29-20 $320.40 537-071-22-06 $320.40 537-690-22-66 $320.40 536-101-29-21 $320.40 537-071-22-07 $320.40 537-690-22-67 $320.40 536-101-29-22 $320.40 537-071-22-08 $320.40 537-690-22-68 $320.40 536-101-29-23 $320.40 537-071-23-01 $665.76 537-690-22-69 $320.40 536-101-35-00 $1,191.84 537-071-23-02 $665.76 537-690-22-70 $320.40 536-102-20-00 $7,151.04 537-071-24-01 $665.76 537-690-22-71 $320.40 536-102-28-00 $3,459.48 537-071-24-02 $665.76 537-690-22-72 $320.40 536-102-31-00 $1,191.84 537-071-25-01 $665.76 537-690-22-73 $320.40 536-102-33-00 $16,690.68 537-071-25-02 $665.76 537-690-22-74 $320.40 536-102-34-01 $320.40 537-071-26-01 $665.76 537-690-22-75 $320.40 536-102-34-02 $320.40 537-071-26-02 $665.76 537-690-22-76 $320.40 536-102-34-03 $320.40 537-071-27-01 $665.76 537-690-22-77 $320.40 536-102-34-04 $320.40 537-071-27-02 $665.76 537-690-22-78 $320.40 536-102-34-05 $320.40 537-071-28-01 $665.76 537-690-23-01 $320.40 536-102-34-06 $320.40 537-071-28-02 $665.76 537-690-23-02 $320.40 536-102-34-07 $320.40 537-072-01-01 $320.40 537-690-23-03 $320.40 536-102-34-08 $320.40 537-072-01-02 $320.40 537-690-23-04 $320.40 536-102-34-09 $320.40 537-072-01-03 $320.40 537-690-23-05 $320.40 536-102-34-10 $320.40 537-072-01-04 $320.40 537-690-23-06 $320.40 536-102-34-11 $320.40 537-072-02-00 $665.76 537-690-23-07 $320.40 536-102-34-12 $320.40 537-072-03-01 $665.76 537-690-23-08 $320.40 536-102-34-13 $1,191.84 537-072-03-02 $665.76 537-690-23-09 $320.40 536-102-34-14 $1,191.84 537-072-05-01 $320.40 537-690-23-10 $320.40 536-102-34-15 $1,191.84 537-072-05-02 $320.40 537-690-23-11 $320.40 536-102-34-16 $1,191.84 537-072-05-03 $320.40 537-690-23-12 $320.40 536-102-34-17 $1,191.84 537-072-05-04 $320.40 537-690-23-13 $320.40 536-102-34-18 $1,191.84 537-072-06-00 $1,922.40 537-690-23-14 $320.40 536-102-34-19 $1,191.84 537-072-07-00 $665.76 537-690-23-15 $320.40 536-102-34-20 $1,191.84 537-072-08-00 $665.76 537-690-23-16 $320.40 536-110-17-00 $175,899.60 537-072-09-00 $665.76 537-690-23-17 $320.40 536-110-20-01 $320.40 537-072-13-00 $986.16 537-690-23-18 $320.40 536-110-20-02 $320.40 537-072-14-00 $665.76 537-690-23-19 $320.40 536-110-20-03 $320.40 537-072-15-00 $665.76 537-690-23-20 $320.40 536-110-20-04 $320.40 537-072-16-00 $665.76 537-690-23-21 $320.40 536-110-20-05 $320.40 537-072-18-01 $320.40 537-690-23-22 $320.40 536-110-20-06 $320.40 537-072-18-02 $320.40 537-690-23-23 $320.40 536-110-20-07 $320.40 537-072-18-03 $320.40 537-690-23-24 $320.40 536-110-20-08 $320.40 537-072-18-04 $320.40 537-690-23-25 $320.40 536-110-20-09 $320.40 537-072-19-00 $665.76 537-690-23-26 $320.40 536-110-20-10 $320.40 537-072-20-00 $1,306.56 537-690-23-27 $320.40 536-110-20-11 $320.40 537-072-21-00 $1,922.40 537-690-23-28 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 369
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-110-20-12 $320.40 537-072-22-01 $320.40 537-690-23-29 $320.40 536-110-20-13 $320.40 537-072-22-02 $320.40 537-690-23-30 $320.40 536-110-20-14 $320.40 537-072-22-03 $320.40 537-690-23-31 $320.40 536-110-20-15 $320.40 537-072-22-04 $320.40 537-690-23-32 $320.40 536-110-20-16 $320.40 537-072-22-05 $320.40 537-690-23-33 $320.40 536-110-20-17 $320.40 537-072-22-06 $320.40 537-690-23-34 $320.40 536-110-20-18 $320.40 537-072-22-07 $320.40 537-690-23-35 $320.40 536-110-20-19 $320.40 537-072-22-08 $320.40 537-690-23-36 $320.40 536-110-20-20 $320.40 537-072-24-00 $961.20 537-690-23-37 $320.40 536-110-20-21 $320.40 537-072-25-00 $665.76 537-690-23-38 $320.40 536-110-20-22 $320.40 537-072-26-00 $665.76 537-690-23-39 $320.40 536-110-20-23 $320.40 537-072-27-00 $1,306.56 537-690-24-01 $320.40 536-110-26-01 $320.40 537-072-28-00 $1,306.56 537-690-24-02 $320.40 536-110-26-04 $320.40 537-072-29-01 $320.40 537-690-24-03 $320.40 536-110-26-05 $320.40 537-072-29-02 $320.40 537-690-24-04 $320.40 536-110-26-06 $320.40 537-072-29-03 $320.40 537-690-24-05 $320.40 536-110-26-07 $320.40 537-072-29-04 $320.40 537-690-24-06 $320.40 536-110-26-08 $320.40 537-072-29-05 $320.40 537-690-24-07 $320.40 536-110-26-09 $320.40 537-072-29-06 $320.40 537-690-24-08 $320.40 536-110-26-10 $320.40 537-072-30-01 $320.40 537-690-24-09 $320.40 536-110-26-11 $320.40 537-072-30-02 $320.40 537-690-24-10 $320.40 536-110-26-12 $320.40 537-072-30-03 $320.40 537-690-24-11 $320.40 536-110-26-13 $320.40 537-072-30-04 $320.40 537-690-24-12 $320.40 536-110-26-14 $320.40 537-072-30-05 $320.40 537-690-24-13 $320.40 536-110-26-15 $320.40 537-072-31-01 $320.40 537-690-24-14 $320.40 536-110-26-16 $320.40 537-072-31-02 $320.40 537-690-24-15 $320.40 536-110-26-17 $320.40 537-072-31-03 $320.40 537-690-24-16 $320.40 536-110-26-18 $320.40 537-072-32-01 $320.40 537-690-24-17 $320.40 536-110-26-19 $320.40 537-072-32-02 $320.40 537-690-24-18 $320.40 536-110-26-20 $320.40 537-072-32-03 $320.40 537-690-24-19 $320.40 536-110-26-21 $320.40 537-072-35-01 $320.40 537-690-24-20 $320.40 536-110-26-22 $320.40 537-072-35-02 $320.40 537-690-24-21 $320.40 536-110-26-23 $320.40 537-072-35-03 $320.40 537-690-24-22 $320.40 536-110-26-24 $320.40 537-072-35-04 $320.40 537-690-24-23 $320.40 536-110-26-25 $320.40 537-081-01-00 $1,922.40 537-690-24-24 $320.40 536-110-26-26 $320.40 537-081-02-00 $665.76 537-690-24-25 $320.40 536-110-26-27 $320.40 537-081-05-00 $665.76 537-690-24-26 $320.40 536-110-26-28 $320.40 537-081-06-00 $665.76 537-690-24-27 $320.40 536-110-26-29 $320.40 537-081-07-01 $665.76 537-690-24-28 $320.40 536-110-26-30 $320.40 537-081-07-02 $665.76 537-690-24-29 $320.40 536-110-26-31 $320.40 537-081-07-03 $665.76 537-690-24-30 $320.40 536-110-26-32 $320.40 537-081-15-01 $320.40 537-690-24-31 $320.40 536-110-26-33 $320.40 537-081-15-02 $320.40 537-690-24-32 $320.40 536-110-26-34 $320.40 537-081-15-03 $320.40 537-690-24-33 $320.40 536-110-26-35 $320.40 537-081-15-04 $320.40 537-690-24-34 $320.40 536-110-26-36 $320.40 537-081-15-05 $320.40 537-690-24-35 $320.40 536-110-26-37 $320.40 537-081-15-06 $320.40 537-690-24-36 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 370
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-110-26-38 $320.40 537-081-16-00 $2,383.68 537-690-24-37 $320.40 536-110-26-39 $320.40 537-082-01-00 $665.76 537-690-24-38 $320.40 536-110-26-40 $320.40 537-082-02-00 $986.16 537-690-24-39 $320.40 536-110-26-41 $320.40 537-082-03-00 $986.16 537-690-24-40 $320.40 536-110-26-42 $320.40 537-082-04-00 $640.80 537-690-24-41 $320.40 536-110-26-43 $320.40 537-082-05-01 $320.40 537-690-24-42 $320.40 536-110-26-44 $320.40 537-082-05-02 $320.40 537-690-24-43 $320.40 536-110-26-45 $320.40 537-082-05-03 $320.40 537-690-24-44 $320.40 536-110-26-46 $320.40 537-082-05-04 $320.40 537-690-24-45 $320.40 536-110-26-47 $320.40 537-082-05-05 $320.40 537-690-24-46 $320.40 536-110-26-48 $320.40 537-082-05-06 $320.40 537-690-24-47 $320.40 536-110-26-49 $320.40 537-082-06-00 $640.80 537-690-24-48 $320.40 536-110-26-50 $320.40 537-082-07-00 $1,306.56 537-690-24-49 $320.40 536-110-26-51 $320.40 537-082-08-01 $665.76 537-690-24-50 $320.40 536-110-26-52 $320.40 537-082-08-02 $665.76 537-690-24-51 $320.40 536-110-26-53 $320.40 537-082-10-01 $665.76 537-690-24-52 $320.40 536-110-26-54 $320.40 537-082-10-02 $665.76 537-690-24-53 $320.40 536-110-26-55 $320.40 537-082-10-03 $665.76 537-690-24-54 $320.40 536-110-26-56 $320.40 537-082-11-01 $320.40 537-690-24-55 $320.40 536-110-26-57 $320.40 537-082-11-02 $320.40 537-690-24-56 $320.40 536-110-26-58 $320.40 537-082-11-03 $320.40 537-690-24-57 $320.40 536-110-26-59 $320.40 537-082-12-00 $2,563.20 537-690-24-58 $320.40 536-110-26-60 $320.40 537-082-13-01 $320.40 537-690-24-59 $320.40 536-110-26-61 $320.40 537-082-13-02 $320.40 537-690-24-60 $320.40 536-110-26-62 $320.40 537-082-13-03 $320.40 537-690-24-61 $320.40 536-110-26-63 $320.40 537-082-14-00 $665.76 537-690-24-62 $320.40 536-110-26-64 $320.40 537-082-26-00 $1,281.60 537-690-24-63 $320.40 536-110-26-65 $320.40 537-083-01-00 $665.76 537-690-24-64 $320.40 536-110-26-66 $320.40 537-083-02-00 $665.76 537-690-24-65 $320.40 536-110-26-67 $320.40 537-083-03-00 $665.76 537-690-24-66 $320.40 536-110-26-68 $320.40 537-083-04-00 $1,997.28 537-690-25-01 $320.40 536-110-26-69 $320.40 537-083-05-00 $1,331.52 537-690-25-02 $320.40 536-110-26-70 $320.40 537-083-06-00 $1,331.52 537-690-25-03 $320.40 536-110-26-71 $320.40 537-083-07-00 $2,883.60 537-690-25-04 $320.40 536-110-26-72 $320.40 537-083-08-00 $665.76 537-690-25-05 $320.40 536-110-26-73 $320.40 537-083-09-00 $665.76 537-690-25-06 $320.40 536-110-26-74 $320.40 537-083-10-00 $3,204.00 537-690-25-07 $320.40 536-110-26-75 $320.40 537-091-05-00 $986.16 537-690-25-08 $320.40 536-110-26-76 $320.40 537-091-06-00 $665.76 537-690-25-09 $320.40 536-110-26-77 $320.40 537-091-07-00 $1,602.00 537-690-25-10 $320.40 536-110-26-78 $320.40 537-091-08-00 $640.80 537-690-25-11 $320.40 536-110-26-79 $320.40 537-091-09-00 $986.16 537-690-25-12 $320.40 536-110-26-80 $320.40 537-091-10-00 $665.76 537-690-25-13 $320.40 536-110-26-81 $320.40 537-091-11-00 $665.76 537-690-25-14 $320.40 536-110-26-82 $320.40 537-091-12-00 $665.76 537-690-25-15 $320.40 536-110-26-83 $320.40 537-091-13-00 $1,281.60 537-690-25-16 $320.40 536-110-26-84 $320.40 537-091-17-00 $665.76 537-690-25-17 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 371
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-110-26-85 $320.40 537-091-18-00 $1,626.96 537-690-25-18 $320.40 536-110-26-86 $320.40 537-091-22-00 $2,383.68 537-690-25-19 $320.40 536-110-26-87 $320.40 537-091-23-00 $2,883.60 537-690-25-20 $320.40 536-110-26-88 $320.40 537-091-24-00 $1,191.84 537-690-25-21 $320.40 536-110-26-89 $320.40 537-091-25-01 $320.40 537-690-25-22 $320.40 536-110-26-90 $320.40 537-091-25-02 $320.40 537-690-25-23 $320.40 536-110-26-91 $320.40 537-091-25-03 $320.40 537-690-25-24 $320.40 536-110-26-92 $320.40 537-091-25-04 $320.40 537-690-25-25 $320.40 536-110-26-93 $320.40 537-091-25-05 $320.40 537-690-25-26 $320.40 536-110-32-01 $320.40 537-091-25-06 $320.40 537-690-25-27 $320.40 536-110-32-02 $320.40 537-091-25-07 $320.40 537-690-25-28 $320.40 536-110-32-03 $320.40 537-091-25-08 $320.40 537-690-25-29 $320.40 536-110-32-04 $320.40 537-091-25-09 $320.40 537-690-25-30 $320.40 536-110-32-05 $320.40 537-091-25-10 $320.40 537-690-25-31 $320.40 536-110-32-06 $320.40 537-091-25-11 $320.40 537-690-25-32 $320.40 536-110-32-07 $320.40 537-091-25-12 $320.40 537-690-25-33 $320.40 536-110-32-08 $320.40 537-091-25-13 $320.40 537-690-25-34 $320.40 536-110-32-09 $320.40 537-091-25-14 $320.40 537-690-25-35 $320.40 536-110-32-10 $320.40 537-091-25-15 $320.40 537-690-25-36 $320.40 536-110-32-11 $320.40 537-091-25-16 $320.40 537-690-25-37 $320.40 536-110-32-12 $320.40 537-091-25-17 $320.40 537-690-25-38 $320.40 536-110-32-13 $320.40 537-091-25-18 $320.40 537-690-25-39 $320.40 536-110-32-14 $320.40 537-091-25-19 $320.40 537-690-25-40 $320.40 536-110-32-15 $320.40 537-091-26-01 $320.40 537-690-25-41 $320.40 536-110-32-16 $320.40 537-091-26-02 $320.40 537-690-25-42 $320.40 536-110-32-17 $320.40 537-091-26-03 $320.40 537-690-25-43 $320.40 536-110-32-18 $320.40 537-091-26-04 $320.40 537-690-25-44 $320.40 536-110-32-19 $320.40 537-091-26-05 $320.40 537-690-25-45 $320.40 536-110-32-20 $320.40 537-091-27-01 $320.40 537-690-25-46 $320.40 536-110-32-21 $320.40 537-091-27-02 $320.40 537-690-25-47 $320.40 536-110-32-22 $320.40 537-091-27-03 $320.40 537-690-25-48 $320.40 536-110-32-23 $320.40 537-091-27-04 $320.40 537-690-25-49 $320.40 536-110-32-24 $320.40 537-091-27-05 $320.40 537-690-25-50 $320.40 536-110-32-25 $320.40 537-091-27-06 $320.40 537-690-25-51 $320.40 536-110-32-26 $320.40 537-092-02-00 $2,242.80 537-690-25-52 $320.40 536-110-32-27 $320.40 537-092-03-01 $320.40 537-690-25-53 $320.40 536-110-32-28 $320.40 537-092-03-02 $320.40 537-690-25-54 $320.40 536-110-34-01 $320.40 537-092-03-03 $320.40 537-690-25-55 $320.40 536-110-34-02 $320.40 537-092-04-00 $961.20 537-690-26-01 $320.40 536-110-34-03 $320.40 537-092-05-00 $986.16 537-690-26-02 $320.40 536-110-34-04 $320.40 537-092-06-00 $1,602.00 537-690-26-03 $320.40 536-110-34-05 $320.40 537-092-07-00 $665.76 537-690-26-04 $320.40 536-110-34-06 $320.40 537-092-08-00 $665.76 537-690-26-05 $320.40 536-110-34-07 $320.40 537-092-09-00 $986.16 537-690-26-06 $320.40 536-110-34-08 $320.40 537-092-10-00 $665.76 537-690-26-07 $320.40 536-110-36-01 $320.40 537-092-14-00 $665.76 537-690-26-08 $320.40 536-110-36-02 $320.40 537-092-15-00 $986.16 537-690-26-09 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 372
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-110-36-03 $320.40 537-092-16-00 $986.16 537-690-26-10 $320.40 536-110-36-04 $320.40 537-092-17-00 $665.76 537-690-26-11 $320.40 536-110-36-05 $320.40 537-092-18-00 $986.16 537-690-26-12 $320.40 536-110-36-06 $320.40 537-092-19-00 $665.76 537-690-26-13 $320.40 536-110-36-07 $320.40 537-092-20-00 $986.16 537-690-26-14 $320.40 536-110-36-08 $320.40 537-092-21-00 $986.16 537-690-26-15 $320.40 536-110-38-01 $320.40 537-092-22-00 $665.76 537-690-26-16 $320.40 536-110-38-02 $320.40 537-092-24-00 $665.76 537-690-26-17 $320.40 536-110-38-03 $320.40 537-092-25-00 $665.76 537-690-26-18 $320.40 536-110-38-04 $320.40 537-092-26-00 $665.76 537-690-26-19 $320.40 536-110-38-05 $320.40 537-092-27-01 $320.40 537-690-26-20 $320.40 536-110-38-06 $320.40 537-092-27-02 $320.40 537-690-26-21 $320.40 536-110-38-07 $320.40 537-092-27-03 $320.40 537-690-26-22 $320.40 536-110-38-08 $320.40 537-092-27-04 $320.40 537-690-26-23 $320.40 536-110-40-01 $320.40 537-092-27-05 $320.40 537-690-26-24 $320.40 536-110-40-02 $320.40 537-092-28-00 $665.76 537-690-26-25 $320.40 536-110-40-03 $320.40 537-092-30-00 $665.76 537-690-26-26 $320.40 536-110-40-04 $320.40 537-092-31-00 $665.76 537-690-26-27 $320.40 536-110-40-05 $320.40 537-101-01-00 $665.76 537-690-26-28 $320.40 536-110-40-06 $320.40 537-101-02-00 $665.76 537-690-26-29 $320.40 536-110-40-07 $320.40 537-101-03-00 $986.16 537-690-26-30 $320.40 536-110-40-08 $320.40 537-101-04-00 $986.16 537-690-26-31 $320.40 536-110-42-01 $320.40 537-101-05-00 $665.76 537-690-26-32 $320.40 536-110-42-02 $320.40 537-101-06-00 $665.76 537-690-26-33 $320.40 536-110-42-03 $320.40 537-101-07-00 $665.76 537-690-26-34 $320.40 536-110-42-04 $320.40 537-101-08-00 $665.76 537-690-26-35 $320.40 536-110-42-05 $320.40 537-101-09-00 $986.16 537-690-26-36 $320.40 536-110-42-06 $320.40 537-101-10-00 $665.76 537-690-26-37 $320.40 536-110-42-07 $320.40 537-101-11-00 $986.16 537-690-26-38 $320.40 536-110-42-08 $320.40 537-101-12-00 $665.76 537-690-26-39 $320.40 536-110-43-01 $320.40 537-101-13-00 $665.76 537-690-26-40 $320.40 536-110-43-02 $320.40 537-101-14-00 $665.76 537-690-26-41 $320.40 536-110-43-03 $320.40 537-101-17-00 $665.76 537-690-26-42 $320.40 536-110-43-04 $320.40 537-101-18-00 $986.16 537-690-26-43 $320.40 536-110-43-05 $320.40 537-101-19-00 $665.76 537-690-26-44 $320.40 536-110-43-06 $320.40 537-101-20-00 $665.76 537-690-26-45 $320.40 536-110-43-07 $320.40 537-101-21-00 $665.76 537-690-26-46 $320.40 536-110-43-08 $320.40 537-102-01-00 $961.20 537-690-26-47 $320.40 536-110-43-09 $320.40 537-102-03-00 $665.76 537-690-26-48 $320.40 536-110-43-10 $320.40 537-102-04-00 $665.76 537-690-26-49 $320.40 536-110-43-11 $320.40 537-102-05-00 $665.76 537-690-26-50 $320.40 536-110-43-12 $320.40 537-102-07-00 $665.76 537-690-26-51 $320.40 536-121-01-00 $665.76 537-102-08-00 $665.76 537-690-26-52 $320.40 536-121-02-00 $665.76 537-102-09-00 $665.76 537-690-26-53 $320.40 536-121-03-00 $986.16 537-102-10-00 $665.76 537-690-26-54 $320.40 536-121-04-00 $665.76 537-102-11-00 $665.76 537-690-26-55 $320.40 536-121-05-00 $665.76 537-102-12-00 $665.76 537-690-26-56 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 373
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-121-06-00 $1,331.52 537-102-17-00 $665.76 537-690-26-57 $320.40 536-121-09-00 $986.16 537-102-20-00 $665.76 537-690-26-58 $320.40 536-121-14-00 $665.76 537-102-21-00 $665.76 537-690-26-59 $320.40 536-121-16-00 $1,331.52 537-102-22-00 $986.16 537-690-26-60 $320.40 536-121-17-00 $986.16 537-102-25-00 $665.76 537-690-26-61 $320.40 536-121-21-00 $665.76 537-102-26-00 $665.76 537-690-26-62 $320.40 536-121-22-00 $665.76 537-102-27-00 $665.76 537-690-26-63 $320.40 536-121-23-00 $665.76 537-102-28-00 $665.76 537-690-26-64 $320.40 536-121-25-00 $665.76 537-102-29-00 $665.76 537-690-26-65 $320.40 536-121-27-00 $665.76 537-102-30-00 $665.76 537-690-26-66 $320.40 536-121-28-00 $665.76 537-102-35-00 $665.76 537-690-26-67 $320.40 536-121-29-00 $665.76 537-102-36-00 $665.76 537-690-26-68 $320.40 536-121-30-00 $665.76 537-110-03-00 $665.76 537-690-26-69 $320.40 536-121-31-00 $665.76 537-110-04-00 $665.76 537-690-26-70 $320.40 536-121-33-00 $665.76 537-110-05-00 $665.76 537-690-26-71 $320.40 536-121-34-00 $665.76 537-110-06-00 $665.76 537-690-26-72 $320.40 536-121-35-00 $665.76 537-110-07-00 $665.76 537-690-26-73 $320.40 536-121-36-00 $665.76 537-110-08-00 $665.76 537-690-26-74 $320.40 536-121-37-00 $665.76 537-110-09-00 $665.76 537-690-26-75 $320.40 536-121-38-00 $665.76 537-110-10-00 $665.76 537-690-26-76 $320.40 536-121-39-00 $665.76 537-110-11-00 $665.76 537-690-26-77 $320.40 536-121-40-00 $320.40 537-110-14-00 $665.76 537-690-26-78 $320.40 536-121-41-00 $665.76 537-110-15-00 $665.76 537-690-26-79 $320.40 536-121-42-00 $665.76 537-110-16-00 $665.76 537-690-26-80 $320.40 536-121-43-00 $665.76 537-110-17-00 $665.76 537-690-26-81 $320.40 536-121-44-00 $665.76 537-110-18-00 $665.76 537-690-27-01 $320.40 536-121-45-00 $665.76 537-110-19-00 $665.76 537-690-27-02 $320.40 536-122-01-00 $665.76 537-110-20-00 $665.76 537-690-27-03 $320.40 536-122-02-00 $665.76 537-110-23-00 $665.76 537-690-27-04 $320.40 536-122-03-00 $986.16 537-110-24-00 $665.76 537-690-27-05 $320.40 536-122-04-00 $665.76 537-110-25-00 $665.76 537-690-27-06 $320.40 536-122-05-00 $665.76 537-110-26-00 $665.76 537-690-27-07 $320.40 536-122-07-00 $1,331.52 537-110-27-00 $665.76 537-690-27-08 $320.40 536-122-08-00 $665.76 537-110-28-00 $665.76 537-690-27-09 $320.40 536-122-09-00 $665.76 537-110-32-00 $665.76 537-690-27-10 $320.40 536-122-10-00 $665.76 537-110-34-00 $665.76 537-690-27-11 $320.40 536-122-11-00 $665.76 537-110-36-00 $665.76 537-690-27-12 $320.40 536-122-12-00 $665.76 537-120-01-00 $665.76 537-690-27-13 $320.40 536-122-13-00 $665.76 537-120-04-00 $665.76 537-690-27-14 $320.40 536-122-17-00 $665.76 537-120-05-00 $665.76 537-690-27-15 $320.40 536-122-18-00 $665.76 537-120-06-00 $665.76 537-690-27-16 $320.40 536-122-19-00 $665.76 537-120-07-00 $665.76 537-690-27-17 $320.40 536-123-01-00 $665.76 537-120-08-00 $665.76 537-690-27-18 $320.40 536-123-02-00 $665.76 537-120-09-00 $665.76 537-690-27-19 $320.40 536-123-03-00 $665.76 537-120-10-00 $665.76 537-690-27-20 $320.40 536-131-01-00 $665.76 537-120-11-00 $665.76 537-690-27-21 $320.40 536-131-02-00 $665.76 537-120-12-00 $665.76 537-690-27-22 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 374
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-131-04-00 $1,331.52 537-120-13-00 $665.76 537-690-27-23 $320.40 536-131-05-00 $665.76 537-120-14-00 $665.76 537-690-27-24 $320.40 536-131-06-00 $665.76 537-120-15-00 $665.76 537-690-27-25 $320.40 536-131-07-00 $665.76 537-120-16-00 $665.76 537-690-27-26 $320.40 536-131-08-00 $665.76 537-120-17-00 $665.76 537-690-27-27 $320.40 536-131-09-00 $665.76 537-120-18-00 $665.76 537-690-27-28 $320.40 536-131-10-00 $1,306.56 537-120-22-00 $665.76 537-690-27-29 $320.40 536-131-11-00 $665.76 537-120-24-00 $665.76 537-690-27-30 $320.40 536-131-12-00 $665.76 537-130-01-00 $665.76 537-690-27-31 $320.40 536-131-14-00 $665.76 537-130-02-00 $665.76 537-690-27-32 $320.40 536-131-15-00 $665.76 537-130-03-00 $665.76 537-690-27-33 $320.40 536-131-16-00 $986.16 537-130-04-00 $665.76 537-690-27-34 $320.40 536-131-20-00 $665.76 537-130-05-00 $665.76 537-690-27-35 $320.40 536-131-23-00 $665.76 537-140-01-00 $665.76 537-690-27-36 $320.40 536-131-24-00 $665.76 537-140-02-00 $665.76 537-690-27-37 $320.40 536-131-25-00 $665.76 537-140-03-00 $665.76 537-690-27-38 $320.40 536-131-26-00 $665.76 537-140-04-00 $986.16 537-690-27-39 $320.40 536-131-27-00 $665.76 537-140-05-00 $665.76 537-690-27-40 $320.40 536-131-28-00 $665.76 537-140-06-00 $665.76 537-690-27-41 $320.40 536-131-29-00 $665.76 537-140-07-00 $665.76 537-690-27-42 $320.40 536-132-01-00 $665.76 537-140-09-00 $665.76 537-690-27-43 $320.40 536-132-02-00 $665.76 537-140-10-00 $665.76 537-690-27-44 $320.40 536-132-03-00 $986.16 537-140-11-00 $665.76 537-690-27-45 $320.40 536-132-04-00 $665.76 537-140-12-00 $665.76 537-690-27-46 $320.40 536-132-05-00 $665.76 537-140-13-00 $640.80 537-690-27-47 $320.40 536-132-06-00 $665.76 537-140-14-00 $665.76 537-690-27-48 $320.40 536-132-07-00 $665.76 537-140-15-00 $665.76 537-690-27-49 $320.40 536-132-08-00 $665.76 537-140-16-00 $665.76 537-690-27-50 $320.40 536-132-09-00 $986.16 537-140-17-00 $665.76 537-690-27-51 $320.40 536-132-10-00 $665.76 537-140-18-00 $665.76 537-690-27-52 $320.40 536-132-11-00 $665.76 537-140-19-00 $665.76 537-690-27-53 $320.40 536-132-12-00 $665.76 537-140-20-00 $665.76 537-690-27-54 $320.40 536-132-13-00 $665.76 537-140-21-00 $986.16 537-690-28-01 $320.40 536-132-14-00 $665.76 537-140-22-00 $986.16 537-690-28-02 $320.40 536-132-15-00 $986.16 537-140-23-00 $665.76 537-690-28-03 $320.40 536-132-16-00 $665.76 537-140-24-00 $665.76 537-690-28-04 $320.40 536-132-17-00 $665.76 537-140-25-00 $665.76 537-690-28-05 $320.40 536-132-18-00 $665.76 537-140-26-00 $665.76 537-690-28-06 $320.40 536-132-19-00 $665.76 537-140-27-00 $665.76 537-690-28-07 $320.40 536-132-20-00 $665.76 537-140-28-00 $665.76 537-690-28-08 $320.40 536-132-21-00 $665.76 537-140-29-00 $665.76 537-690-28-09 $320.40 536-132-22-00 $665.76 537-140-30-00 $665.76 537-690-28-10 $320.40 536-132-23-00 $665.76 537-140-31-00 $665.76 537-690-28-11 $320.40 536-132-24-00 $665.76 537-140-32-00 $665.76 537-690-28-12 $320.40 536-132-25-00 $665.76 537-140-33-00 $665.76 537-690-28-13 $320.40 536-132-26-00 $665.76 537-140-34-00 $665.76 537-690-28-14 $320.40 536-132-27-00 $665.76 537-140-37-00 $665.76 537-690-28-15 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 375
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-132-28-00 $665.76 537-140-38-00 $665.76 537-690-28-16 $320.40 536-141-01-00 $665.76 537-151-01-00 $665.76 537-690-28-17 $320.40 536-141-02-00 $665.76 537-151-02-00 $665.76 537-690-28-18 $320.40 536-141-03-00 $665.76 537-151-03-00 $665.76 537-690-28-19 $320.40 536-141-04-00 $1,331.52 537-151-04-00 $665.76 537-690-28-20 $320.40 536-141-06-00 $665.76 537-151-05-00 $665.76 537-690-28-21 $320.40 536-141-08-00 $665.76 537-151-06-00 $665.76 537-690-28-22 $320.40 536-141-09-00 $665.76 537-151-07-00 $665.76 537-690-28-23 $320.40 536-141-10-00 $1,331.52 537-151-08-00 $665.76 537-690-28-24 $320.40 536-141-11-00 $665.76 537-151-09-00 $665.76 537-690-28-25 $320.40 536-141-13-00 $986.16 537-151-10-00 $665.76 537-690-28-26 $320.40 536-141-14-00 $665.76 537-151-11-00 $665.76 537-690-28-27 $320.40 536-141-15-00 $665.76 537-151-12-00 $665.76 537-690-28-28 $320.40 536-141-16-00 $1,331.52 537-151-13-00 $665.76 537-690-28-29 $320.40 536-141-19-00 $665.76 537-151-14-00 $665.76 537-690-28-30 $320.40 536-141-20-00 $1,331.52 537-151-15-00 $665.76 537-690-28-31 $320.40 536-141-21-00 $665.76 537-151-16-00 $665.76 537-690-28-32 $320.40 536-141-22-00 $665.76 537-151-17-00 $665.76 537-690-28-33 $320.40 536-141-23-00 $665.76 537-151-18-00 $665.76 537-690-28-34 $320.40 536-141-24-00 $665.76 537-152-01-00 $665.76 537-690-28-35 $320.40 536-141-26-00 $665.76 537-152-02-00 $665.76 537-690-28-36 $320.40 536-141-27-00 $1,331.52 537-152-03-00 $665.76 537-690-28-37 $320.40 536-141-29-00 $665.76 537-152-04-00 $665.76 537-690-28-38 $320.40 536-141-30-00 $986.16 537-152-05-00 $665.76 537-690-28-39 $320.40 536-141-31-00 $665.76 537-152-06-00 $665.76 537-690-28-40 $320.40 536-141-32-00 $665.76 537-152-07-00 $665.76 537-690-28-41 $320.40 536-141-33-00 $665.76 537-152-08-00 $665.76 537-690-28-42 $320.40 536-141-34-00 $665.76 537-152-09-00 $665.76 537-690-28-43 $320.40 536-141-35-00 $665.76 537-152-10-00 $665.76 537-690-28-44 $320.40 536-141-36-00 $665.76 537-152-11-00 $665.76 537-690-28-45 $320.40 536-141-37-00 $665.76 537-152-12-00 $986.16 537-690-28-46 $320.40 536-141-38-00 $665.76 537-152-13-00 $665.76 537-690-28-47 $320.40 536-141-39-00 $665.76 537-152-14-00 $665.76 537-690-28-48 $320.40 536-141-40-00 $665.76 537-152-15-00 $665.76 537-690-28-51 $320.40 536-141-41-00 $665.76 537-152-16-00 $665.76 537-690-28-52 $320.40 536-141-42-00 $665.76 537-152-17-00 $665.76 537-690-28-53 $320.40 536-142-01-00 $665.76 537-152-18-00 $665.76 537-690-28-54 $320.40 536-142-02-00 $665.76 537-152-19-00 $665.76 537-690-28-55 $320.40 536-142-04-00 $665.76 537-152-20-00 $665.76 537-690-28-56 $320.40 536-142-05-00 $665.76 537-152-21-00 $665.76 537-690-28-57 $320.40 536-142-06-00 $665.76 537-152-22-00 $665.76 537-690-28-58 $320.40 536-142-08-00 $986.16 537-152-23-00 $665.76 537-690-28-59 $320.40 536-142-09-00 $1,331.52 537-152-24-00 $665.76 537-690-28-60 $320.40 536-142-10-00 $1,331.52 537-152-25-00 $665.76 537-690-28-61 $320.40 536-142-11-00 $1,331.52 537-161-01-00 $665.76 537-690-28-62 $320.40 536-142-12-00 $665.76 537-161-02-00 $665.76 537-690-28-63 $320.40 536-142-13-00 $665.76 537-161-03-00 $665.76 537-690-28-64 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 376
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-142-14-00 $665.76 537-161-04-00 $665.76 537-690-28-65 $320.40 536-142-15-00 $665.76 537-162-01-00 $665.76 537-690-28-66 $320.40 536-142-16-00 $665.76 537-162-02-00 $665.76 537-690-28-67 $320.40 536-142-17-00 $665.76 537-162-03-00 $665.76 537-690-28-68 $320.40 536-142-18-00 $1,331.52 537-162-04-00 $665.76 537-690-28-69 $320.40 536-142-19-00 $986.16 537-162-05-00 $665.76 537-690-28-70 $320.40 536-142-20-00 $986.16 537-162-06-00 $665.76 537-690-28-71 $320.40 536-142-23-00 $1,306.56 537-162-07-00 $665.76 537-690-28-72 $320.40 536-142-24-00 $665.76 537-162-08-00 $665.76 537-690-28-73 $320.40 536-142-25-00 $665.76 537-162-09-00 $665.76 537-690-28-74 $320.40 536-142-26-00 $665.76 537-162-10-00 $665.76 537-690-28-75 $320.40 536-142-27-00 $665.76 537-162-11-00 $665.76 537-690-28-76 $320.40 536-142-28-00 $665.76 537-162-12-00 $665.76 537-690-28-77 $320.40 536-142-29-00 $665.76 537-162-13-00 $665.76 537-690-28-78 $320.40 536-142-30-00 $665.76 537-162-14-00 $665.76 537-690-28-79 $320.40 536-142-31-00 $665.76 537-162-15-00 $665.76 537-690-28-80 $320.40 536-142-32-00 $665.76 537-162-16-00 $665.76 537-690-28-82 $320.40 536-142-33-00 $665.76 537-162-17-00 $665.76 537-690-28-83 $320.40 536-142-34-00 $665.76 537-162-18-00 $665.76 537-690-29-01 $320.40 536-151-01-00 $665.76 537-162-19-00 $665.76 537-690-29-02 $320.40 536-151-02-00 $665.76 537-162-20-00 $665.76 537-690-29-03 $320.40 536-151-03-00 $665.76 537-162-21-00 $665.76 537-690-29-04 $320.40 536-151-04-00 $665.76 537-171-01-00 $665.76 537-690-29-05 $320.40 536-151-05-00 $665.76 537-171-02-00 $665.76 537-690-29-06 $320.40 536-151-06-00 $665.76 537-171-03-00 $665.76 537-690-29-07 $320.40 536-151-07-00 $665.76 537-171-04-00 $665.76 537-690-29-08 $320.40 536-151-08-00 $665.76 537-171-05-00 $665.76 537-690-29-09 $320.40 536-151-09-00 $665.76 537-171-06-00 $665.76 537-690-29-10 $320.40 536-151-10-00 $665.76 537-171-07-00 $665.76 537-690-29-11 $320.40 536-151-11-00 $665.76 537-171-08-00 $665.76 537-690-29-12 $320.40 536-151-12-00 $665.76 537-171-09-00 $665.76 537-690-29-13 $320.40 536-151-13-00 $665.76 537-171-10-00 $665.76 537-690-29-14 $320.40 536-151-14-00 $986.16 537-171-11-00 $665.76 537-690-29-15 $320.40 536-151-15-00 $665.76 537-171-12-00 $665.76 537-690-29-16 $320.40 536-151-16-00 $665.76 537-171-13-00 $665.76 537-690-29-17 $320.40 536-151-17-00 $665.76 537-171-14-00 $665.76 537-690-29-18 $320.40 536-151-18-00 $665.76 537-171-15-00 $665.76 537-690-29-19 $320.40 536-151-19-00 $665.76 537-171-16-00 $665.76 537-690-29-20 $320.40 536-151-20-00 $665.76 537-171-17-00 $665.76 537-690-29-21 $320.40 536-151-21-00 $665.76 537-171-18-00 $665.76 537-690-29-22 $320.40 536-151-22-00 $986.16 537-172-01-00 $665.76 537-690-29-23 $320.40 536-151-23-00 $986.16 537-172-02-00 $665.76 537-690-29-24 $320.40 536-151-24-00 $665.76 537-172-03-00 $665.76 537-690-29-25 $320.40 536-151-25-00 $986.16 537-172-04-00 $665.76 537-690-29-26 $320.40 536-151-26-00 $665.76 537-172-05-00 $986.16 537-690-29-27 $320.40 536-151-27-00 $665.76 537-172-06-00 $665.76 537-690-29-28 $320.40 536-151-28-00 $665.76 537-172-07-00 $665.76 537-690-29-29 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 377
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-152-01-00 $3,204.00 537-172-09-00 $665.76 537-690-29-30 $320.40 536-152-02-00 $3,524.40 537-172-12-00 $665.76 537-690-29-31 $320.40 536-152-03-00 $961.20 537-172-15-00 $665.76 537-690-29-32 $320.40 536-152-04-00 $1,281.60 537-172-16-00 $665.76 537-690-29-33 $320.40 536-152-05-00 $2,883.60 537-180-01-00 $665.76 537-690-29-34 $320.40 536-152-06-01 $665.76 537-180-02-00 $986.16 537-690-29-35 $320.40 536-152-06-02 $665.76 537-180-03-00 $665.76 537-690-29-36 $320.40 536-152-07-00 $1,281.60 537-180-04-00 $665.76 537-690-29-37 $320.40 536-152-08-00 $2,242.80 537-180-05-00 $665.76 537-690-29-38 $320.40 536-152-10-00 $1,281.60 537-180-06-00 $665.76 537-690-29-39 $320.40 536-152-11-00 $3,947.52 537-180-07-00 $665.76 537-690-29-40 $320.40 536-152-12-00 $3,700.80 537-180-08-00 $665.76 537-690-29-41 $320.40 536-152-13-00 $961.20 537-180-09-00 $665.76 537-690-29-42 $320.40 536-152-14-00 $986.16 537-180-10-00 $665.76 537-690-29-43 $320.40 536-152-15-00 $640.80 537-180-11-00 $665.76 537-690-29-44 $320.40 536-152-23-00 $4,806.00 537-180-12-00 $665.76 537-690-29-45 $320.40 536-152-24-01 $320.40 537-180-13-00 $665.76 537-690-29-46 $320.40 536-152-24-02 $320.40 537-180-14-00 $665.76 537-690-29-47 $320.40 536-152-24-03 $320.40 537-180-17-00 $665.76 537-690-29-48 $320.40 536-152-24-04 $320.40 537-180-18-00 $665.76 537-690-29-49 $320.40 536-152-24-05 $320.40 537-190-01-00 $665.76 537-690-29-50 $320.40 536-152-24-06 $320.40 537-190-02-00 $665.76 537-690-29-51 $320.40 536-152-24-07 $320.40 537-190-03-00 $665.76 537-690-29-52 $320.40 536-152-24-08 $320.40 537-190-04-00 $665.76 537-690-29-53 $320.40 536-152-24-09 $320.40 537-190-05-00 $665.76 537-690-29-54 $320.40 536-152-24-10 $320.40 537-190-06-00 $665.76 537-690-29-55 $320.40 536-152-24-11 $320.40 537-190-07-00 $665.76 537-690-29-56 $320.40 536-152-24-12 $320.40 537-190-08-00 $665.76 537-690-29-57 $320.40 536-152-25-01 $320.40 537-190-09-00 $665.76 537-690-29-58 $320.40 536-152-25-02 $320.40 537-190-10-00 $665.76 537-690-29-59 $320.40 536-152-25-03 $320.40 537-190-11-00 $665.76 537-690-29-60 $320.40 536-152-25-04 $320.40 537-190-12-00 $665.76 537-690-29-61 $320.40 536-152-25-05 $320.40 537-190-13-00 $665.76 537-690-29-62 $320.40 536-152-25-06 $320.40 537-190-14-00 $665.76 537-690-29-63 $320.40 536-152-25-07 $320.40 537-190-16-00 $665.76 537-690-29-64 $320.40 536-152-25-08 $320.40 537-190-17-00 $665.76 537-690-29-65 $320.40 536-152-25-09 $320.40 537-190-18-00 $665.76 537-690-29-66 $320.40 536-152-26-01 $665.76 537-190-19-00 $665.76 537-690-29-67 $320.40 536-152-26-02 $665.76 537-190-20-00 $665.76 537-690-29-68 $320.40 536-152-27-01 $665.76 537-190-22-00 $665.76 537-690-30-01 $320.40 536-152-27-02 $665.76 537-190-23-00 $665.76 537-690-30-02 $320.40 536-161-05-00 $1,922.40 537-190-24-00 $665.76 537-690-30-03 $320.40 536-161-06-01 $320.40 537-190-25-00 $665.76 537-690-30-04 $320.40 536-161-06-02 $320.40 537-190-27-00 $665.76 537-690-30-05 $320.40 536-161-06-03 $320.40 537-190-28-00 $665.76 537-690-30-06 $320.40 536-161-06-04 $320.40 537-211-01-00 $665.76 537-690-30-07 $320.40 536-161-06-05 $320.40 537-211-02-00 $986.16 537-690-30-08 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 378
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-161-06-06 $320.40 537-211-03-00 $665.76 537-690-30-09 $320.40 536-161-07-00 $1,922.40 537-211-04-00 $665.76 537-690-30-10 $320.40 536-161-08-00 $1,281.60 537-211-05-00 $665.76 537-690-30-11 $320.40 536-161-09-00 $1,306.56 537-211-06-00 $665.76 537-690-30-12 $320.40 536-161-14-00 $665.76 537-211-08-00 $665.76 537-690-30-13 $320.40 536-161-15-00 $665.76 537-211-09-00 $665.76 537-690-30-14 $320.40 536-161-16-00 $665.76 537-211-10-00 $986.16 537-690-30-15 $320.40 536-161-17-00 $665.76 537-211-11-00 $665.76 537-690-30-16 $320.40 536-161-18-00 $665.76 537-211-12-00 $986.16 537-690-30-17 $320.40 536-161-19-00 $665.76 537-211-13-00 $665.76 537-690-30-18 $320.40 536-161-20-00 $665.76 537-211-14-00 $665.76 537-690-30-19 $320.40 536-161-24-00 $986.16 537-211-15-00 $986.16 537-690-30-20 $320.40 536-161-25-00 $1,922.40 537-211-16-00 $986.16 537-690-30-21 $320.40 536-161-26-00 $665.76 537-211-17-00 $665.76 537-690-30-22 $320.40 536-161-27-00 $1,306.56 537-211-18-00 $986.16 537-690-30-23 $320.40 536-161-28-00 $665.76 537-211-19-00 $665.76 537-690-30-24 $320.40 536-161-29-00 $1,281.60 537-211-20-00 $665.76 537-690-30-25 $320.40 536-161-32-00 $15,543.36 537-212-01-00 $665.76 537-690-30-26 $320.40 536-161-33-01 $320.40 537-212-02-00 $986.16 537-690-30-27 $320.40 536-161-33-02 $320.40 537-212-03-00 $986.16 537-690-30-28 $320.40 536-161-33-03 $320.40 537-212-04-00 $665.76 537-690-30-29 $320.40 536-161-33-04 $320.40 537-212-05-00 $986.16 537-690-30-30 $320.40 536-161-33-05 $320.40 537-212-06-00 $986.16 537-690-30-31 $320.40 536-161-33-06 $320.40 537-212-08-00 $665.76 537-690-30-32 $320.40 536-161-33-07 $320.40 537-212-09-00 $986.16 537-690-30-33 $320.40 536-161-33-08 $320.40 537-212-10-00 $665.76 537-690-30-34 $320.40 536-161-34-01 $665.76 537-212-11-00 $665.76 537-690-30-35 $320.40 536-161-34-02 $665.76 537-212-13-00 $665.76 537-690-30-36 $320.40 536-161-35-01 $665.76 537-212-14-00 $665.76 537-690-30-37 $320.40 536-161-35-02 $665.76 537-212-15-00 $665.76 537-690-30-38 $320.40 536-161-36-01 $320.40 537-212-16-00 $986.16 537-690-30-39 $320.40 536-161-36-02 $320.40 537-212-17-00 $665.76 537-690-30-40 $320.40 536-161-36-03 $320.40 537-212-18-00 $665.76 537-690-30-41 $320.40 536-161-36-04 $320.40 537-212-21-00 $665.76 537-690-30-42 $320.40 536-161-37-01 $320.40 537-212-23-00 $665.76 537-690-30-43 $320.40 536-161-37-02 $320.40 537-212-24-00 $665.76 537-690-30-44 $320.40 536-161-37-03 $320.40 537-212-25-00 $665.76 537-690-30-45 $320.40 536-161-37-04 $320.40 537-212-26-00 $665.76 537-690-30-46 $320.40 536-161-40-00 $665.76 537-212-27-00 $665.76 537-690-30-47 $320.40 536-162-01-00 $640.80 537-212-28-00 $665.76 537-690-30-48 $320.40 536-162-02-00 $665.76 537-212-29-00 $665.76 537-690-30-49 $320.40 536-162-03-00 $961.20 537-212-30-00 $665.76 537-690-30-50 $320.40 536-162-04-00 $1,602.00 537-221-01-00 $665.76 537-690-30-51 $320.40 536-162-07-00 $1,922.40 537-221-02-00 $665.76 537-690-30-52 $320.40 536-162-09-00 $1,922.40 537-221-03-00 $665.76 537-690-30-53 $320.40 536-162-12-00 $1,602.00 537-221-04-00 $665.76 537-690-30-54 $320.40 536-162-13-00 $665.76 537-221-05-00 $986.16 537-690-30-55 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 379
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-162-14-00 $665.76 537-221-09-00 $665.76 537-690-30-56 $320.40 536-162-15-00 $1,922.40 537-221-10-00 $665.76 537-690-30-57 $320.40 536-162-16-00 $986.16 537-221-11-00 $665.76 537-690-30-58 $320.40 536-162-17-00 $1,281.60 537-221-12-00 $665.76 537-690-30-59 $320.40 536-162-18-00 $961.20 537-221-13-00 $665.76 537-690-30-60 $320.40 536-162-22-01 $320.40 537-221-14-00 $986.16 537-690-30-61 $320.40 536-162-22-02 $320.40 537-221-15-00 $665.76 537-690-30-62 $320.40 536-162-22-03 $320.40 537-221-16-00 $665.76 537-690-30-63 $320.40 536-162-22-04 $320.40 537-221-17-00 $665.76 537-690-30-64 $320.40 536-162-23-00 $961.20 537-221-18-00 $665.76 537-690-30-65 $320.40 536-162-24-00 $665.76 537-221-19-00 $665.76 537-690-30-66 $320.40 536-162-25-00 $1,997.28 537-221-20-00 $986.16 537-690-30-67 $320.40 536-162-26-01 $320.40 537-221-21-00 $665.76 537-690-30-68 $320.40 536-162-26-02 $320.40 537-221-22-00 $665.76 537-690-30-69 $320.40 536-162-26-03 $320.40 537-221-23-00 $665.76 537-690-30-70 $320.40 536-162-26-04 $320.40 537-221-24-00 $665.76 537-690-31-01 $320.40 536-162-26-05 $320.40 537-221-25-00 $986.16 537-690-31-02 $320.40 536-162-26-06 $320.40 537-221-26-00 $665.76 537-690-31-03 $320.40 536-162-26-07 $320.40 537-221-28-00 $665.76 537-690-31-04 $320.40 536-162-26-08 $320.40 537-221-29-00 $665.76 537-690-31-05 $320.40 536-162-26-09 $320.40 537-221-30-00 $665.76 537-690-31-06 $320.40 536-162-26-10 $320.40 537-221-31-00 $665.76 537-690-31-07 $320.40 536-162-27-00 $1,602.00 537-221-32-00 $986.16 537-690-31-08 $320.40 536-162-29-00 $665.76 537-221-33-00 $665.76 537-690-31-09 $320.40 536-162-30-00 $665.76 537-221-34-00 $665.76 537-690-31-10 $320.40 536-162-31-00 $665.76 537-221-35-00 $665.76 537-690-31-11 $320.40 536-162-32-00 $665.76 537-221-36-00 $665.76 537-690-31-12 $320.40 536-162-33-00 $665.76 537-221-37-00 $665.76 537-690-31-13 $320.40 536-162-34-00 $665.76 537-221-38-00 $665.76 537-690-31-14 $320.40 536-162-35-01 $665.76 537-221-39-00 $665.76 537-690-31-15 $320.40 536-162-35-02 $665.76 537-221-40-00 $665.76 537-690-31-16 $320.40 536-162-36-01 $665.76 537-221-41-00 $665.76 537-690-31-17 $320.40 536-162-36-02 $665.76 537-222-03-00 $665.76 537-690-31-18 $320.40 536-162-37-01 $665.76 537-222-05-00 $665.76 537-690-31-19 $320.40 536-162-37-02 $665.76 537-222-06-00 $665.76 537-690-31-20 $320.40 536-162-38-01 $665.76 537-222-07-00 $640.80 537-690-31-21 $320.40 536-162-38-02 $665.76 537-222-08-00 $665.76 537-690-31-22 $320.40 536-171-01-00 $665.76 537-222-09-00 $665.76 537-690-31-23 $320.40 536-171-02-00 $665.76 537-222-10-00 $986.16 537-690-31-24 $320.40 536-171-05-00 $665.76 537-222-11-00 $665.76 537-690-31-25 $320.40 536-171-07-00 $665.76 537-222-12-00 $665.76 537-690-31-26 $320.40 536-171-08-00 $665.76 537-222-13-00 $986.16 537-690-31-27 $320.40 536-171-09-00 $986.16 537-222-15-00 $665.76 537-690-31-28 $320.40 536-171-10-00 $665.76 537-222-16-00 $665.76 537-690-31-29 $320.40 536-171-11-00 $665.76 537-222-17-01 $320.40 537-690-31-30 $320.40 536-171-12-00 $665.76 537-222-17-02 $320.40 537-690-31-31 $320.40 536-171-13-00 $665.76 537-222-19-00 $2,563.20 537-690-31-32 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 380
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-171-14-00 $665.76 537-222-20-01 $320.40 537-690-31-33 $320.40 536-171-15-00 $665.76 537-222-20-02 $320.40 537-690-31-34 $320.40 536-171-25-00 $665.76 537-222-20-03 $320.40 537-690-31-35 $320.40 536-171-27-00 $665.76 537-222-21-00 $665.76 537-690-31-36 $320.40 536-171-28-00 $665.76 537-222-22-00 $1,922.40 537-690-31-37 $320.40 536-171-31-03 $665.76 537-222-24-00 $986.16 537-690-31-38 $320.40 536-171-31-04 $665.76 537-222-25-00 $665.76 537-690-31-39 $320.40 536-171-32-01 $665.76 537-222-26-00 $665.76 537-690-31-40 $320.40 536-171-37-00 $665.76 537-222-30-00 $1,922.40 537-690-31-41 $320.40 536-171-38-00 $665.76 537-222-31-00 $665.76 537-690-31-42 $320.40 536-171-40-00 $665.76 537-222-32-00 $665.76 537-690-31-43 $320.40 536-171-41-00 $665.76 537-222-33-00 $640.80 537-690-31-44 $320.40 536-171-43-00 $665.76 537-222-34-00 $665.76 537-690-31-45 $320.40 536-171-44-00 $665.76 537-222-35-00 $665.76 537-690-31-46 $320.40 536-171-45-00 $665.76 537-222-36-00 $665.76 537-690-31-47 $320.40 536-171-46-00 $665.76 537-222-37-00 $665.76 537-690-31-48 $320.40 536-171-47-00 $665.76 537-222-38-00 $665.76 537-690-31-49 $320.40 536-171-48-00 $665.76 537-231-01-01 $320.40 537-690-31-50 $320.40 536-171-49-00 $665.76 537-231-01-02 $320.40 537-690-31-51 $320.40 536-171-50-00 $665.76 537-231-01-03 $320.40 537-690-31-52 $320.40 536-171-51-00 $665.76 537-231-02-00 $320.40 537-690-31-53 $320.40 536-171-54-00 $665.76 537-231-03-00 $665.76 537-690-31-54 $320.40 536-171-63-00 $665.76 537-231-05-00 $665.76 537-690-31-55 $320.40 536-171-64-00 $665.76 537-231-06-01 $665.76 537-690-31-56 $320.40 536-171-65-00 $665.76 537-231-06-02 $665.76 537-690-31-57 $320.40 536-171-66-00 $665.76 537-231-07-00 $665.76 537-690-31-58 $320.40 536-172-01-01 $665.76 537-231-08-00 $1,281.60 537-690-31-59 $320.40 536-172-02-01 $665.76 537-231-10-00 $665.76 537-690-31-60 $320.40 536-172-03-01 $665.76 537-231-11-00 $961.20 537-690-31-61 $320.40 536-172-04-01 $665.76 537-231-12-00 $665.76 537-690-31-62 $320.40 536-172-05-01 $665.76 537-231-13-00 $665.76 537-690-31-63 $320.40 536-172-06-01 $665.76 537-231-15-00 $665.76 537-690-31-64 $320.40 536-172-07-01 $665.76 537-231-16-01 $665.76 537-690-31-65 $320.40 536-172-08-01 $665.76 537-231-16-02 $665.76 537-690-31-66 $320.40 536-172-09-01 $665.76 537-231-16-03 $665.76 537-690-31-67 $320.40 536-172-10-01 $665.76 537-231-17-01 $320.40 537-690-31-68 $320.40 536-172-11-01 $665.76 537-231-17-02 $320.40 537-690-31-69 $320.40 536-172-12-01 $665.76 537-231-17-03 $320.40 537-690-31-70 $320.40 536-172-13-01 $665.76 537-231-18-00 $1,281.60 537-690-31-71 $320.40 536-172-14-01 $665.76 537-231-19-00 $1,997.28 537-690-31-72 $320.40 536-172-15-01 $665.76 537-231-20-00 $640.80 537-690-31-73 $320.40 536-172-16-01 $665.76 537-231-21-00 $665.76 537-690-31-74 $320.40 536-172-17-01 $665.76 537-231-22-00 $1,281.60 537-690-31-75 $320.40 536-172-18-01 $665.76 537-231-26-00 $640.80 537-690-31-76 $320.40 536-172-19-00 $665.76 537-231-27-01 $320.40 537-690-31-77 $320.40 536-172-22-00 $665.76 537-231-27-02 $320.40 537-690-31-78 $320.40 536-172-23-00 $665.76 537-231-28-01 $665.76 537-691-01-01 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 381
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-172-24-00 $986.16 537-231-28-02 $665.76 537-691-01-02 $320.40 536-172-25-00 $665.76 537-231-29-01 $665.76 537-691-01-03 $320.40 536-172-26-00 $665.76 537-231-29-02 $665.76 537-691-01-04 $320.40 536-172-27-00 $665.76 537-231-30-01 $665.76 537-691-01-05 $320.40 536-172-28-00 $665.76 537-231-30-02 $665.76 537-691-01-06 $320.40 536-172-32-00 $665.76 537-231-31-01 $665.76 537-691-01-07 $320.40 536-172-33-00 $665.76 537-231-31-02 $665.76 537-691-01-08 $320.40 536-172-34-00 $665.76 537-232-01-01 $665.76 537-691-01-09 $320.40 536-172-35-00 $665.76 537-232-01-02 $665.76 537-691-01-10 $320.40 536-172-38-00 $665.76 537-232-01-03 $665.76 537-691-01-11 $320.40 536-172-39-00 $665.76 537-232-02-00 $665.76 537-691-01-12 $320.40 536-172-40-00 $665.76 537-233-01-00 $986.16 537-691-01-13 $320.40 536-172-41-00 $665.76 537-233-02-00 $665.76 537-691-01-14 $320.40 536-172-42-00 $665.76 537-233-07-00 $1,281.60 537-691-01-15 $320.40 536-172-43-00 $665.76 537-233-08-00 $1,922.40 537-691-01-16 $320.40 536-191-01-00 $665.76 537-233-09-01 $320.40 537-691-01-17 $320.40 536-191-02-00 $1,331.52 537-233-09-02 $320.40 537-691-01-18 $320.40 536-191-03-00 $665.76 537-233-09-03 $320.40 537-691-01-19 $320.40 536-191-05-00 $665.76 537-233-09-04 $320.40 537-691-01-20 $320.40 536-191-06-00 $665.76 537-233-10-01 $320.40 537-691-01-21 $320.40 536-191-07-00 $665.76 537-233-10-02 $320.40 537-691-01-22 $320.40 536-191-10-00 $665.76 537-233-10-03 $320.40 537-691-01-23 $320.40 536-191-11-00 $665.76 537-233-10-04 $320.40 537-691-01-24 $320.40 536-191-15-00 $1,331.52 537-233-10-05 $320.40 537-691-01-25 $320.40 536-191-16-00 $986.16 537-233-10-06 $320.40 537-691-01-26 $320.40 536-191-17-00 $1,331.52 537-233-10-07 $320.40 537-691-01-27 $320.40 536-191-19-00 $665.76 537-233-10-08 $320.40 537-691-01-28 $320.40 536-191-21-00 $986.16 537-233-10-09 $320.40 537-691-01-29 $320.40 536-191-22-00 $665.76 537-233-10-10 $320.40 537-691-01-30 $320.40 536-191-23-00 $665.76 537-233-11-01 $665.76 537-691-01-31 $320.40 536-191-24-00 $665.76 537-233-11-02 $665.76 537-691-01-32 $320.40 536-191-25-00 $665.76 537-233-12-01 $320.40 537-691-01-33 $320.40 536-191-26-00 $665.76 537-233-12-02 $320.40 537-691-01-34 $320.40 536-191-27-00 $665.76 537-233-12-03 $320.40 537-691-01-35 $320.40 536-191-29-00 $665.76 537-233-12-04 $320.40 537-691-01-36 $320.40 536-191-30-00 $665.76 537-233-13-01 $665.76 537-691-01-37 $320.40 536-191-31-00 $665.76 537-233-13-02 $665.76 537-691-01-38 $320.40 536-191-32-00 $665.76 537-233-14-01 $320.40 537-691-01-39 $320.40 536-191-33-00 $665.76 537-233-14-02 $320.40 537-691-01-40 $320.40 536-191-34-00 $1,331.52 537-233-14-03 $320.40 537-691-01-41 $320.40 536-191-35-00 $665.76 537-233-14-04 $320.40 537-691-01-42 $320.40 536-191-36-00 $665.76 537-233-15-00 $1,922.40 537-691-01-43 $320.40 536-191-37-00 $665.76 537-233-16-00 $986.16 537-691-01-44 $320.40 536-191-38-00 $665.76 537-233-17-00 $665.76 537-691-01-45 $320.40 536-191-39-00 $665.76 537-233-18-00 $1,947.36 537-691-01-46 $320.40 536-192-01-00 $986.16 537-233-19-01 $320.40 537-691-01-47 $320.40 536-192-02-00 $665.76 537-233-19-02 $320.40 537-691-01-48 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 382
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-192-03-00 $665.76 537-233-20-01 $320.40 537-691-01-49 $320.40 536-192-04-00 $665.76 537-233-20-02 $320.40 537-691-01-50 $320.40 536-192-06-00 $986.16 537-233-20-03 $320.40 537-691-01-51 $320.40 536-192-07-00 $665.76 537-233-20-04 $320.40 537-691-01-52 $320.40 536-192-11-00 $1,997.28 537-233-20-05 $320.40 537-691-01-53 $320.40 536-192-12-00 $665.76 537-233-20-06 $320.40 537-691-01-54 $320.40 536-192-14-00 $1,331.52 537-233-21-01 $320.40 537-691-01-55 $320.40 536-192-17-01 $665.76 537-233-21-02 $320.40 537-691-01-56 $320.40 536-192-17-02 $665.76 537-233-21-03 $320.40 537-691-01-57 $320.40 536-192-20-00 $665.76 537-233-21-04 $320.40 537-691-01-58 $320.40 536-192-21-00 $665.76 537-233-21-05 $320.40 537-691-01-59 $320.40 536-192-22-00 $665.76 537-233-21-06 $320.40 537-691-01-60 $320.40 536-192-23-00 $665.76 537-234-01-00 $665.76 537-691-01-61 $320.40 536-192-24-00 $665.76 537-234-02-00 $665.76 537-691-01-62 $320.40 536-192-25-00 $665.76 537-234-03-00 $665.76 537-691-01-63 $320.40 536-192-27-00 $665.76 537-241-10-00 $665.76 537-691-01-64 $320.40 536-192-28-00 $665.76 537-241-11-00 $665.76 537-691-01-65 $320.40 536-192-29-00 $665.76 537-241-12-00 $665.76 537-691-01-66 $320.40 536-192-30-00 $1,331.52 537-241-13-01 $665.76 537-691-01-69 $320.40 536-192-31-00 $665.76 537-241-13-02 $665.76 537-691-01-70 $320.40 536-192-32-00 $665.76 537-241-14-00 $665.76 537-691-01-71 $320.40 536-192-33-00 $665.76 537-241-15-00 $665.76 537-691-01-72 $320.40 536-192-34-00 $665.76 537-241-16-00 $665.76 537-691-01-73 $320.40 536-192-35-00 $665.76 537-241-19-00 $986.16 537-691-01-74 $320.40 536-192-36-00 $665.76 537-241-20-01 $320.40 537-691-01-75 $320.40 536-192-37-00 $665.76 537-241-20-02 $320.40 537-691-01-76 $320.40 536-192-38-00 $665.76 537-241-20-03 $320.40 537-691-01-77 $320.40 536-192-39-00 $665.76 537-241-20-04 $320.40 537-691-01-78 $320.40 536-192-40-00 $665.76 537-241-21-00 $986.16 537-691-01-79 $320.40 536-192-41-00 $665.76 537-241-22-00 $986.16 537-691-01-80 $320.40 536-192-42-00 $665.76 537-241-23-01 $665.76 537-691-01-81 $320.40 536-201-05-00 $665.76 537-241-23-02 $665.76 537-691-02-01 $320.40 536-201-06-01 $665.76 537-241-24-01 $320.40 537-691-02-02 $320.40 536-201-06-02 $665.76 537-241-24-02 $320.40 537-691-02-03 $320.40 536-201-07-00 $1,331.52 537-241-24-03 $320.40 537-691-02-04 $320.40 536-201-10-00 $665.76 537-241-24-04 $320.40 537-691-02-05 $320.40 536-201-11-00 $665.76 537-241-24-05 $320.40 537-691-02-06 $320.40 536-201-12-00 $961.20 537-241-24-06 $320.40 537-691-02-07 $320.40 536-201-13-00 $665.76 537-241-24-07 $320.40 537-691-02-08 $320.40 536-201-14-00 $665.76 537-241-24-08 $320.40 537-691-02-09 $320.40 536-201-15-00 $1,331.52 537-241-24-09 $320.40 537-691-02-10 $320.40 536-201-17-00 $1,331.52 537-241-24-10 $320.40 537-691-02-13 $320.40 536-201-18-00 $665.76 537-241-24-11 $320.40 537-691-02-14 $320.40 536-201-19-00 $665.76 537-241-24-12 $320.40 537-691-02-15 $320.40 536-201-20-00 $665.76 537-241-24-13 $320.40 537-691-02-16 $320.40 536-201-21-00 $1,331.52 537-241-24-14 $320.40 537-691-02-17 $320.40 536-201-22-00 $665.76 537-241-24-15 $320.40 537-691-02-18 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 383
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-201-24-00 $665.76 537-241-25-00 $1,306.56 537-691-02-19 $320.40 536-201-26-00 $665.76 537-241-26-00 $640.80 537-691-02-20 $320.40 536-201-27-00 $665.76 537-241-27-00 $665.76 537-691-02-21 $320.40 536-201-28-00 $665.76 537-241-28-01 $320.40 537-691-02-22 $320.40 536-201-29-00 $665.76 537-241-28-02 $320.40 537-691-02-23 $320.40 536-201-30-00 $665.76 537-241-28-03 $320.40 537-691-02-24 $320.40 536-201-31-00 $665.76 537-241-28-04 $320.40 537-691-02-25 $320.40 536-201-32-00 $665.76 537-241-28-05 $320.40 537-691-02-26 $320.40 536-201-33-00 $665.76 537-241-28-06 $320.40 537-691-02-27 $320.40 536-201-34-00 $665.76 537-241-28-07 $320.40 537-691-02-28 $320.40 536-201-35-00 $665.76 537-241-28-08 $320.40 537-691-02-29 $320.40 536-201-36-00 $665.76 537-241-28-09 $320.40 537-691-02-30 $320.40 536-201-37-00 $665.76 537-241-28-10 $320.40 537-691-02-31 $320.40 536-201-38-00 $665.76 537-241-28-11 $320.40 537-691-02-32 $320.40 536-201-39-00 $665.76 537-241-28-12 $320.40 537-691-02-33 $320.40 536-201-40-00 $665.76 537-241-28-13 $320.40 537-691-02-34 $320.40 536-201-41-00 $665.76 537-241-28-14 $320.40 537-691-02-35 $320.40 536-202-01-00 $4,165.20 537-241-28-15 $320.40 537-691-02-36 $320.40 536-202-02-00 $665.76 537-241-30-01 $320.40 537-691-02-37 $320.40 536-202-03-00 $665.76 537-241-30-02 $320.40 537-691-02-38 $320.40 536-202-04-00 $665.76 537-241-30-03 $320.40 537-691-02-39 $320.40 536-202-05-00 $1,306.56 537-241-30-04 $320.40 537-691-02-40 $320.40 536-202-06-00 $665.76 537-241-30-05 $320.40 537-691-02-41 $320.40 536-202-07-00 $665.76 537-241-30-06 $320.40 537-691-02-42 $320.40 536-202-08-00 $665.76 537-241-30-07 $320.40 537-691-02-43 $320.40 536-202-09-00 $986.16 537-241-30-08 $320.40 537-691-02-44 $320.40 536-203-01-00 $1,306.56 537-241-30-09 $320.40 537-691-02-45 $320.40 536-203-02-00 $665.76 537-241-30-10 $320.40 537-691-02-46 $320.40 536-203-03-00 $665.76 537-241-30-11 $320.40 537-691-02-47 $320.40 536-203-04-00 $665.76 537-241-30-12 $320.40 537-691-02-48 $320.40 536-203-05-00 $665.76 537-241-30-13 $320.40 537-691-02-49 $320.40 536-203-07-00 $665.76 537-241-30-14 $320.40 537-691-02-50 $320.40 536-203-08-00 $665.76 537-241-31-01 $320.40 537-691-02-51 $320.40 536-203-09-00 $665.76 537-241-31-02 $320.40 537-691-02-52 $320.40 536-203-10-00 $665.76 537-241-31-03 $320.40 537-691-02-53 $320.40 536-203-11-00 $665.76 537-241-31-04 $320.40 537-691-02-54 $320.40 536-203-12-00 $665.76 537-241-31-05 $320.40 537-691-02-55 $320.40 536-203-13-00 $665.76 537-241-32-01 $320.40 537-691-02-56 $320.40 536-203-14-00 $665.76 537-241-32-02 $320.40 537-691-02-57 $320.40 536-211-02-00 $665.76 537-241-32-03 $320.40 537-691-02-58 $320.40 536-211-03-00 $665.76 537-241-32-04 $320.40 537-691-02-59 $320.40 536-211-05-00 $665.76 537-241-32-05 $320.40 537-691-02-60 $320.40 536-211-08-00 $665.76 537-241-33-01 $665.76 537-691-02-61 $320.40 536-211-09-00 $665.76 537-241-33-02 $665.76 537-691-02-62 $320.40 536-211-10-00 $986.16 537-241-34-01 $665.76 537-691-02-63 $320.40 536-211-11-00 $986.16 537-241-34-02 $665.76 537-691-02-64 $320.40 536-211-12-00 $1,191.84 537-242-01-00 $1,602.00 537-691-02-65 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 384
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-211-13-00 $1,191.84 537-242-02-00 $2,383.68 537-691-02-66 $320.40 536-211-14-00 $665.76 537-242-13-00 $3,459.48 537-691-02-67 $320.40 536-211-15-00 $665.76 537-242-17-00 $1,191.84 537-691-02-68 $320.40 536-211-16-00 $665.76 537-242-18-00 $8,342.88 537-691-02-69 $320.40 536-211-17-00 $986.16 537-242-19-00 $2,383.68 537-691-02-70 $320.40 536-211-18-00 $665.76 537-242-20-01 $1,191.84 537-691-02-71 $320.40 536-211-20-00 $665.76 537-242-20-02 $1,191.84 537-693-01-01 $320.40 536-211-21-00 $665.76 537-242-20-03 $1,191.84 537-693-01-02 $320.40 536-211-22-00 $665.76 537-242-21-00 $1,191.84 537-693-01-03 $320.40 536-211-23-00 $665.76 537-242-23-00 $3,459.48 537-693-01-04 $320.40 536-211-26-00 $665.76 537-242-24-01 $320.40 537-693-01-05 $320.40 536-211-27-00 $665.76 537-242-24-02 $320.40 537-693-01-06 $320.40 536-211-28-00 $1,191.84 537-242-24-03 $320.40 537-693-01-07 $320.40 536-211-29-00 $665.76 537-242-24-04 $320.40 537-693-01-08 $320.40 536-211-30-00 $665.76 537-242-24-05 $320.40 537-693-01-09 $320.40 536-211-31-00 $665.76 537-242-24-06 $320.40 537-693-01-10 $320.40 536-211-32-00 $665.76 537-251-01-00 $1,191.84 537-693-01-11 $320.40 536-211-33-00 $665.76 537-251-02-00 $1,191.84 537-693-01-12 $320.40 536-211-35-00 $665.76 537-251-06-00 $4,651.32 537-693-01-13 $320.40 536-211-36-00 $665.76 537-251-07-00 $3,459.48 537-693-01-14 $320.40 536-211-37-00 $665.76 537-251-08-00 $4,767.36 537-693-01-15 $320.40 536-211-38-00 $665.76 537-251-09-00 $1,191.84 537-693-01-16 $320.40 536-211-39-00 $665.76 537-251-10-00 $3,575.52 537-693-01-17 $320.40 536-211-40-00 $665.76 537-251-11-00 $3,575.52 537-693-01-18 $320.40 536-211-41-00 $665.76 537-251-12-01 $320.40 537-693-01-19 $320.40 536-211-42-00 $665.76 537-251-12-02 $320.40 537-693-01-20 $320.40 536-211-43-00 $665.76 537-251-12-03 $320.40 537-693-01-21 $320.40 536-211-44-00 $665.76 537-251-12-04 $320.40 537-693-01-22 $320.40 536-211-45-00 $665.76 537-251-13-00 $986.16 537-693-01-23 $320.40 536-212-01-00 $665.76 537-251-14-00 $1,997.28 537-693-01-24 $320.40 536-212-02-00 $665.76 537-251-17-00 $665.76 537-693-01-25 $320.40 536-212-03-00 $665.76 537-251-18-00 $2,563.20 537-693-01-26 $320.40 536-212-05-00 $986.16 537-251-21-00 $665.76 537-693-01-27 $320.40 536-212-06-00 $986.16 537-251-22-00 $665.76 537-693-01-28 $320.40 536-212-07-00 $1,331.52 537-251-23-00 $665.76 537-693-01-29 $320.40 536-212-08-00 $665.76 537-251-24-00 $665.76 537-693-01-30 $320.40 536-212-09-00 $665.76 537-251-25-01 $320.40 537-693-01-31 $320.40 536-212-10-00 $986.16 537-251-25-02 $320.40 537-693-01-32 $320.40 536-212-12-00 $665.76 537-251-25-03 $320.40 537-693-01-33 $320.40 536-212-13-00 $665.76 537-251-25-04 $320.40 537-693-01-34 $320.40 536-212-14-00 $665.76 537-251-25-05 $320.40 537-693-01-35 $320.40 536-212-15-00 $665.76 537-251-25-06 $320.40 537-693-01-36 $320.40 536-212-16-00 $665.76 537-251-25-07 $320.40 537-693-01-37 $320.40 536-212-17-00 $665.76 537-251-25-08 $320.40 537-693-01-38 $320.40 536-212-18-00 $986.16 537-251-25-09 $320.40 537-693-01-39 $320.40 536-212-19-00 $665.76 537-251-25-10 $320.40 537-693-01-40 $320.40 536-212-20-00 $665.76 537-251-26-00 $1,191.84 537-693-01-41 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 385
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-212-21-00 $1,331.52 537-251-27-01 $320.40 537-693-01-42 $320.40 536-212-22-00 $665.76 537-251-27-02 $320.40 537-693-01-43 $320.40 536-212-23-00 $665.76 537-251-27-03 $320.40 537-693-01-44 $320.40 536-212-31-00 $665.76 537-251-27-04 $320.40 537-693-01-45 $320.40 536-212-32-00 $665.76 537-251-27-05 $320.40 537-693-01-46 $320.40 536-212-33-00 $665.76 537-251-30-01 $665.76 537-693-01-47 $320.40 536-212-34-00 $665.76 537-251-30-02 $665.76 537-693-01-49 $320.40 536-212-35-00 $665.76 537-251-30-03 $665.76 537-693-01-50 $320.40 536-212-36-00 $665.76 537-251-30-04 $665.76 537-693-01-51 $320.40 536-212-37-00 $665.76 537-252-04-01 $665.76 537-693-01-52 $320.40 536-212-38-00 $665.76 537-252-04-02 $665.76 537-693-01-53 $320.40 536-212-39-00 $665.76 537-252-05-01 $665.76 537-693-01-54 $320.40 536-212-41-00 $665.76 537-252-05-02 $665.76 537-693-01-55 $320.40 536-212-43-00 $986.16 537-252-08-01 $665.76 537-693-01-56 $320.40 536-221-01-00 $665.76 537-252-08-02 $665.76 537-693-01-57 $320.40 536-221-02-00 $665.76 537-252-09-00 $1,602.00 537-693-01-58 $320.40 536-221-03-00 $986.16 537-252-10-00 $665.76 537-693-01-59 $320.40 536-221-04-00 $1,306.56 537-252-11-00 $665.76 537-693-01-60 $320.40 536-221-08-00 $665.76 537-252-12-00 $665.76 537-693-01-61 $320.40 536-221-09-00 $665.76 537-252-13-00 $640.80 537-693-01-62 $320.40 536-221-13-00 $665.76 537-252-20-00 $665.76 537-693-01-63 $320.40 536-221-14-00 $665.76 537-252-21-00 $665.76 537-693-01-64 $320.40 536-221-15-00 $1,331.52 537-252-22-00 $665.76 537-693-01-65 $320.40 536-221-16-00 $1,306.56 537-252-24-00 $665.76 537-693-01-66 $320.40 536-221-18-00 $986.16 537-252-25-00 $665.76 537-693-01-67 $320.40 536-221-19-00 $1,306.56 537-252-26-01 $320.40 537-693-01-68 $320.40 536-221-20-00 $665.76 537-252-26-02 $320.40 537-693-01-69 $320.40 536-221-22-00 $665.76 537-252-26-03 $320.40 537-693-01-70 $320.40 536-221-26-00 $665.76 537-252-26-04 $320.40 537-693-01-71 $320.40 536-221-27-00 $665.76 537-252-26-05 $320.40 537-693-01-72 $320.40 536-221-28-00 $665.76 537-252-26-06 $320.40 537-693-01-75 $320.40 536-221-29-00 $665.76 537-252-26-07 $320.40 537-693-02-01 $320.40 536-221-30-00 $665.76 537-252-26-08 $320.40 537-693-02-02 $320.40 536-221-31-00 $665.76 537-252-26-09 $320.40 537-693-02-03 $320.40 536-221-32-00 $665.76 537-252-26-10 $320.40 537-693-02-04 $320.40 536-221-33-00 $665.76 537-252-26-11 $320.40 537-693-02-05 $320.40 536-221-34-00 $665.76 537-252-26-12 $320.40 537-693-02-06 $320.40 536-221-35-00 $665.76 537-252-26-13 $320.40 537-693-02-07 $320.40 536-221-36-00 $665.76 537-252-26-14 $320.40 537-693-02-08 $320.40 536-221-37-00 $665.76 537-252-26-15 $320.40 537-693-02-09 $320.40 536-221-38-00 $665.76 537-252-26-16 $320.40 537-693-02-10 $320.40 536-221-39-00 $665.76 537-252-26-17 $320.40 537-693-02-11 $320.40 536-221-40-00 $665.76 537-252-26-18 $320.40 537-693-02-12 $320.40 536-221-41-00 $665.76 537-252-27-00 $986.16 537-693-02-13 $320.40 536-221-42-00 $665.76 537-252-28-00 $665.76 537-693-02-14 $320.40 536-221-43-00 $665.76 537-252-30-00 $665.76 537-693-02-15 $320.40 536-222-01-01 $320.40 537-252-31-00 $665.76 537-693-02-16 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 386
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-222-01-02 $320.40 537-252-32-00 $665.76 537-693-02-17 $320.40 536-222-01-03 $320.40 537-252-33-00 $665.76 537-693-02-18 $320.40 536-222-01-04 $320.40 537-252-34-00 $665.76 537-693-02-19 $320.40 536-222-02-01 $320.40 537-252-35-00 $665.76 537-693-02-20 $320.40 536-222-02-02 $320.40 537-252-36-00 $665.76 537-693-02-21 $320.40 536-222-02-03 $320.40 537-252-37-00 $665.76 537-693-02-22 $320.40 536-222-04-01 $320.40 537-252-38-00 $665.76 537-693-02-23 $320.40 536-222-04-02 $320.40 537-252-39-01 $665.76 537-693-02-24 $320.40 536-222-04-03 $320.40 537-252-39-02 $665.76 537-693-02-25 $320.40 536-222-04-04 $320.40 537-252-40-01 $665.76 537-693-02-26 $320.40 536-222-06-00 $1,922.40 537-252-40-02 $665.76 537-693-02-27 $320.40 536-222-07-00 $2,563.20 537-252-41-00 $665.76 537-693-02-28 $320.40 536-222-08-00 $320.40 537-252-42-00 $665.76 537-693-02-29 $320.40 536-222-09-01 $320.40 537-252-44-00 $986.16 537-693-02-30 $320.40 536-222-09-02 $320.40 537-252-45-00 $665.76 537-693-02-31 $320.40 536-222-09-03 $320.40 537-261-01-00 $665.76 537-693-02-32 $320.40 536-222-10-00 $665.76 537-261-02-00 $665.76 537-693-02-33 $320.40 536-222-11-00 $665.76 537-261-03-00 $986.16 537-693-02-34 $320.40 536-222-13-00 $986.88 537-261-05-00 $665.76 537-693-02-35 $320.40 536-222-14-00 $986.88 537-261-06-00 $665.76 537-693-02-36 $320.40 536-222-15-00 $1,947.36 537-261-09-00 $986.16 537-693-02-37 $320.40 536-222-18-00 $1,281.60 537-261-10-00 $986.16 537-693-02-38 $320.40 536-222-19-00 $665.76 537-261-11-00 $986.16 537-693-02-39 $320.40 536-222-20-00 $2,267.76 537-261-12-00 $665.76 537-693-02-40 $320.40 536-222-21-00 $665.76 537-261-13-00 $665.76 537-693-02-41 $320.40 536-222-22-00 $2,713.92 537-261-14-00 $665.76 537-693-02-42 $320.40 536-222-23-00 $1,973.76 537-261-15-00 $665.76 537-693-02-43 $320.40 536-222-24-01 $320.40 537-261-16-00 $665.76 537-693-02-44 $320.40 536-222-24-02 $320.40 537-261-17-00 $665.76 537-693-02-45 $320.40 536-222-24-03 $320.40 537-261-18-00 $665.76 537-693-02-46 $320.40 536-222-24-04 $320.40 537-261-19-00 $986.16 537-693-02-47 $320.40 536-222-24-05 $320.40 537-261-20-00 $665.76 537-693-02-48 $320.40 536-222-24-06 $320.40 537-261-21-00 $665.76 537-693-02-49 $320.40 536-222-25-01 $320.40 537-261-22-00 $986.16 537-693-02-50 $320.40 536-222-25-02 $320.40 537-261-23-00 $986.16 537-693-02-51 $320.40 536-222-25-03 $320.40 537-261-24-00 $665.76 537-693-02-52 $320.40 536-222-25-04 $320.40 537-261-25-00 $665.76 537-693-02-53 $320.40 536-222-25-05 $320.40 537-261-26-00 $665.76 537-693-02-54 $320.40 536-222-26-01 $320.40 537-261-27-00 $1,331.52 537-693-02-55 $320.40 536-222-26-02 $320.40 537-261-28-00 $665.76 537-693-02-56 $320.40 536-222-27-00 $665.76 537-261-29-00 $665.76 537-693-02-57 $320.40 536-222-28-01 $320.40 537-261-30-00 $665.76 537-693-02-58 $320.40 536-222-28-02 $320.40 537-261-31-00 $665.76 537-693-02-59 $320.40 536-222-28-03 $320.40 537-261-32-00 $665.76 537-693-02-60 $320.40 536-222-28-04 $320.40 537-261-33-00 $665.76 537-693-02-61 $320.40 536-222-28-05 $320.40 537-261-34-00 $665.76 537-693-02-62 $320.40 536-222-28-06 $320.40 537-262-01-00 $986.16 537-693-02-63 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 387
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-222-28-07 $320.40 537-262-02-00 $665.76 537-695-01-01 $320.40 536-222-28-08 $320.40 537-262-03-00 $665.76 537-695-01-02 $320.40 536-222-28-09 $320.40 537-262-04-00 $665.76 537-695-01-03 $320.40 536-222-28-10 $320.40 537-262-05-00 $665.76 537-695-01-04 $320.40 536-222-28-11 $320.40 537-262-06-00 $665.76 537-695-01-05 $320.40 536-222-28-12 $320.40 537-262-07-00 $665.76 537-695-01-06 $320.40 536-231-01-00 $3,207.36 537-262-08-00 $665.76 537-695-01-07 $320.40 536-231-09-00 $2,563.20 537-262-09-00 $986.16 537-695-01-08 $320.40 536-231-10-00 $665.76 537-262-10-00 $665.76 537-695-01-09 $320.40 536-231-11-00 $665.76 537-262-11-00 $665.76 537-695-01-10 $320.40 536-231-12-00 $665.76 537-262-12-00 $665.76 537-695-01-11 $320.40 536-231-13-00 $665.76 537-262-13-00 $665.76 537-695-01-12 $320.40 536-231-14-00 $986.16 537-262-14-00 $665.76 537-695-01-13 $320.40 536-231-15-00 $986.16 537-262-16-00 $665.76 537-695-01-14 $320.40 536-231-16-00 $1,331.52 537-262-17-00 $665.76 537-695-01-15 $320.40 536-231-17-00 $1,306.56 537-262-18-00 $665.76 537-695-01-16 $320.40 536-231-19-00 $1,281.60 537-262-19-00 $665.76 537-695-01-17 $320.40 536-231-20-00 $665.76 537-262-20-00 $665.76 537-695-01-18 $320.40 536-231-21-00 $665.76 537-262-21-00 $665.76 537-695-01-19 $320.40 536-231-22-00 $665.76 537-271-01-00 $665.76 537-695-01-20 $320.40 536-231-23-00 $665.76 537-271-02-00 $986.16 537-695-01-21 $320.40 536-231-24-00 $665.76 537-271-03-00 $665.76 537-695-01-22 $320.40 536-231-25-01 $320.40 537-271-04-00 $665.76 537-695-01-23 $320.40 536-231-25-02 $320.40 537-271-05-00 $665.76 537-695-01-24 $320.40 536-231-25-03 $320.40 537-271-06-00 $665.76 537-695-01-25 $320.40 536-231-25-04 $320.40 537-271-07-00 $665.76 537-695-01-26 $320.40 536-231-25-05 $320.40 537-271-08-00 $665.76 537-695-01-27 $320.40 536-231-25-06 $320.40 537-271-09-00 $665.76 537-695-01-28 $320.40 536-231-25-07 $320.40 537-272-01-00 $665.76 537-695-01-29 $320.40 536-231-25-08 $320.40 537-272-02-00 $665.76 537-695-01-30 $320.40 536-231-25-09 $320.40 537-272-03-00 $665.76 537-695-01-31 $320.40 536-231-25-10 $320.40 537-272-04-00 $665.76 537-695-01-32 $320.40 536-231-25-11 $320.40 537-272-05-00 $665.76 537-695-01-33 $320.40 536-231-25-12 $320.40 537-272-06-00 $665.76 537-695-01-34 $320.40 536-231-25-13 $320.40 537-272-07-00 $665.76 537-695-01-35 $320.40 536-231-25-14 $320.40 537-272-08-00 $665.76 537-695-01-36 $320.40 536-231-25-15 $320.40 537-272-09-00 $665.76 537-695-01-37 $320.40 536-231-25-16 $320.40 537-272-10-00 $665.76 537-695-01-38 $320.40 536-231-25-17 $320.40 537-272-11-00 $665.76 537-695-01-39 $320.40 536-231-25-18 $320.40 537-272-12-00 $665.76 537-695-01-40 $320.40 536-231-25-19 $320.40 537-272-13-00 $665.76 537-695-01-41 $320.40 536-231-25-20 $320.40 537-272-14-00 $665.76 537-695-01-42 $320.40 536-231-25-21 $320.40 537-272-15-00 $986.16 537-695-01-43 $320.40 536-231-25-22 $320.40 537-272-16-00 $665.76 537-695-01-44 $320.40 536-231-25-23 $320.40 537-273-01-00 $665.76 537-695-01-45 $320.40 536-231-25-24 $320.40 537-273-02-00 $665.76 537-695-01-46 $320.40 536-231-25-25 $320.40 537-273-03-00 $665.76 537-695-01-47 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 388
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-231-25-26 $320.40 537-273-04-00 $665.76 537-695-01-48 $320.40 536-231-25-27 $320.40 537-273-05-00 $665.76 537-695-01-49 $320.40 536-231-25-28 $320.40 537-273-06-00 $665.76 537-695-01-50 $320.40 536-231-25-29 $320.40 537-273-07-00 $665.76 537-695-01-51 $320.40 536-231-25-30 $320.40 537-273-08-00 $665.76 537-695-01-52 $320.40 536-231-25-31 $320.40 537-273-09-00 $665.76 537-695-01-53 $320.40 536-231-25-32 $320.40 537-274-01-00 $665.76 537-695-01-54 $320.40 536-231-25-33 $320.40 537-274-02-00 $665.76 537-695-01-55 $320.40 536-231-25-34 $320.40 537-274-03-00 $665.76 537-695-01-56 $320.40 536-231-25-35 $320.40 537-281-01-00 $986.16 537-695-01-57 $320.40 536-231-25-36 $320.40 537-281-02-00 $665.76 537-695-01-58 $320.40 536-231-25-37 $320.40 537-281-03-00 $665.76 537-695-01-59 $320.40 536-231-25-38 $320.40 537-281-04-00 $665.76 537-695-01-60 $320.40 536-231-25-39 $320.40 537-281-05-00 $665.76 537-695-01-61 $320.40 536-231-25-40 $320.40 537-281-06-00 $665.76 537-695-01-62 $320.40 536-231-25-41 $320.40 537-281-07-00 $665.76 537-695-01-63 $320.40 536-231-25-42 $320.40 537-281-08-00 $665.76 537-695-01-64 $320.40 536-231-25-43 $320.40 537-281-09-00 $665.76 537-695-01-65 $320.40 536-231-25-44 $320.40 537-281-10-00 $986.16 537-695-01-66 $320.40 536-231-25-45 $320.40 537-281-11-00 $665.76 537-695-01-67 $320.40 536-231-25-46 $320.40 537-282-01-00 $665.76 537-695-01-68 $320.40 536-231-25-47 $320.40 537-282-02-00 $665.76 537-695-01-69 $320.40 536-231-25-48 $320.40 537-282-03-00 $665.76 537-695-01-70 $320.40 536-231-26-00 $2,883.60 537-282-04-00 $665.76 537-695-01-71 $320.40 536-231-27-00 $665.76 537-282-06-00 $665.76 537-695-01-72 $320.40 536-231-28-00 $665.76 537-282-07-00 $665.76 537-695-02-01 $320.40 536-232-01-00 $665.76 537-282-08-00 $665.76 537-695-02-02 $320.40 536-232-02-00 $665.76 537-282-09-00 $665.76 537-695-02-03 $320.40 536-232-04-00 $665.76 537-282-10-00 $665.76 537-695-02-06 $320.40 536-232-06-00 $665.76 537-282-11-00 $665.76 537-695-02-07 $320.40 536-232-07-00 $665.76 537-291-01-00 $665.76 537-695-02-08 $320.40 536-232-08-00 $1,306.56 537-291-02-00 $665.76 537-695-02-09 $320.40 536-232-09-00 $665.76 537-291-03-00 $665.76 537-695-02-10 $320.40 536-232-10-00 $665.76 537-291-04-00 $665.76 537-695-02-11 $320.40 536-232-12-00 $1,331.52 537-291-05-00 $665.76 537-695-02-12 $320.40 536-232-14-00 $1,331.52 537-291-06-00 $665.76 537-695-02-13 $320.40 536-232-15-00 $665.76 537-291-07-00 $665.76 537-695-02-14 $320.40 536-232-16-00 $1,331.52 537-291-08-00 $665.76 537-695-02-15 $320.40 536-232-18-00 $1,331.52 537-291-09-00 $665.76 537-695-02-16 $320.40 536-232-19-00 $1,331.52 537-291-10-00 $665.76 537-695-02-17 $320.40 536-232-20-00 $665.76 537-291-11-00 $986.16 537-695-02-18 $320.40 536-232-21-00 $665.76 537-292-01-00 $665.76 537-695-02-19 $320.40 536-232-24-00 $665.76 537-292-02-00 $665.76 537-695-02-20 $320.40 536-232-25-00 $665.76 537-292-03-00 $665.76 537-695-02-21 $320.40 536-232-26-00 $665.76 537-292-04-00 $665.76 537-695-02-22 $320.40 536-232-27-00 $665.76 537-292-05-00 $1,331.52 537-695-02-23 $320.40 536-232-28-00 $665.76 537-292-06-00 $665.76 537-695-02-24 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 389
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-232-29-00 $665.76 537-292-07-00 $665.76 537-695-02-25 $320.40 536-232-30-00 $665.76 537-292-08-00 $665.76 537-695-02-26 $320.40 536-232-31-00 $665.76 537-292-09-00 $986.16 537-695-02-27 $320.40 536-232-32-00 $665.76 537-301-01-00 $986.16 537-695-02-28 $320.40 536-232-33-00 $665.76 537-301-02-00 $665.76 537-695-02-29 $320.40 536-232-34-00 $665.76 537-301-03-00 $665.76 537-695-02-30 $320.40 536-232-35-00 $665.76 537-301-04-00 $665.76 537-695-02-31 $320.40 536-232-36-00 $665.76 537-301-05-00 $665.76 537-695-02-32 $320.40 536-232-37-00 $665.76 537-301-06-00 $986.16 537-695-02-33 $320.40 536-232-38-00 $665.76 537-301-07-00 $986.16 537-695-02-34 $320.40 536-232-39-00 $665.76 537-301-08-00 $665.76 537-695-02-35 $320.40 536-232-40-00 $665.76 537-301-09-00 $986.16 537-695-02-36 $320.40 536-232-41-00 $665.76 537-301-10-00 $1,997.28 537-695-02-37 $320.40 536-241-01-00 $665.76 537-301-11-00 $665.76 537-695-02-38 $320.40 536-241-02-00 $665.76 537-301-12-00 $986.16 537-695-02-39 $320.40 536-241-03-00 $665.76 537-301-13-00 $986.16 537-695-02-40 $320.40 536-241-04-00 $665.76 537-301-14-00 $665.76 537-695-02-41 $320.40 536-241-05-00 $1,306.56 537-301-15-00 $986.16 537-695-02-42 $320.40 536-241-06-00 $665.76 537-301-16-00 $665.76 537-695-02-43 $320.40 536-241-07-00 $665.76 537-301-17-00 $665.76 537-695-02-44 $320.40 536-241-08-00 $665.76 537-302-02-00 $665.76 537-695-02-45 $320.40 536-241-09-00 $1,331.52 537-302-04-00 $665.76 537-695-02-46 $320.40 536-241-10-00 $665.76 537-302-05-00 $986.16 537-695-02-47 $320.40 536-241-11-00 $665.76 537-302-06-00 $665.76 537-695-02-48 $320.40 536-241-12-00 $665.76 537-302-07-00 $986.16 537-695-02-49 $320.40 536-241-13-00 $665.76 537-302-08-00 $986.16 537-695-02-50 $320.40 536-241-14-00 $665.76 537-302-09-00 $665.76 537-695-02-51 $320.40 536-241-15-00 $986.16 537-302-10-00 $665.76 537-695-02-52 $320.40 536-241-16-00 $665.76 537-302-11-00 $665.76 537-695-02-53 $320.40 536-241-17-00 $665.76 537-302-12-00 $665.76 537-695-02-54 $320.40 536-241-18-00 $665.76 537-302-13-00 $665.76 537-695-02-55 $320.40 536-241-19-00 $665.76 537-302-14-00 $665.76 537-695-02-56 $320.40 536-241-20-00 $665.76 537-302-15-00 $665.76 537-695-02-57 $320.40 536-241-21-00 $665.76 537-302-16-00 $665.76 537-695-02-58 $320.40 536-241-22-00 $1,331.52 537-302-17-00 $665.76 537-695-02-59 $320.40 536-242-01-00 $665.76 537-302-18-00 $665.76 537-695-02-60 $320.40 536-242-02-00 $665.76 537-302-19-00 $665.76 537-695-02-61 $320.40 536-242-03-01 $986.16 537-302-20-00 $665.76 537-695-02-62 $320.40 536-242-05-01 $665.76 537-302-22-00 $665.76 537-695-02-63 $320.40 536-242-06-01 $665.76 537-302-23-00 $665.76 537-695-02-64 $320.40 536-242-07-01 $665.76 537-302-24-00 $665.76 615-061-01-00 $665.76 536-242-08-01 $665.76 537-302-26-00 $665.76 615-061-02-00 $665.76 536-242-09-01 $665.76 537-302-27-00 $665.76 615-061-03-00 $665.76 536-242-11-00 $665.76 537-302-28-00 $665.76 615-061-04-00 $665.76 536-242-12-00 $665.76 537-302-29-00 $665.76 615-061-05-00 $665.76 536-242-13-00 $665.76 537-311-01-00 $665.76 615-061-06-00 $665.76 536-242-14-00 $986.16 537-311-02-00 $665.76 615-061-07-00 $665.76
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 390
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-242-15-00 $665.76 537-311-03-00 $665.76 615-061-08-00 $665.76 536-242-16-00 $665.76 537-311-04-00 $986.16 615-061-09-00 $665.76 536-242-17-01 $665.76 537-311-05-00 $986.16 615-061-10-00 $665.76 536-242-18-01 $665.76 537-311-06-00 $986.16 615-061-11-00 $665.76 536-242-19-01 $665.76 537-311-07-00 $665.76 615-061-12-00 $665.76 536-242-20-01 $665.76 537-311-08-00 $665.76 615-061-13-00 $665.76 536-242-21-00 $665.76 537-311-09-00 $665.76 615-061-14-00 $665.76 536-242-22-00 $665.76 537-311-10-00 $665.76 615-061-15-00 $665.76 536-251-01-00 $665.76 537-311-11-00 $665.76 615-061-16-00 $665.76 536-251-02-00 $665.76 537-311-12-00 $1,331.52 615-061-17-00 $665.76 536-251-03-00 $1,331.52 537-311-13-00 $986.16 615-061-18-00 $665.76 536-251-04-00 $665.76 537-311-14-00 $665.76 615-061-19-00 $665.76 536-251-05-00 $665.76 537-311-15-00 $665.76 615-061-20-00 $665.76 536-251-06-00 $665.76 537-311-16-00 $665.76 615-061-21-00 $665.76 536-251-07-00 $665.76 537-311-17-00 $665.76 615-061-22-00 $665.76 536-252-01-00 $665.76 537-311-18-00 $665.76 615-062-02-00 $665.76 536-252-02-00 $665.76 537-311-19-00 $665.76 615-062-03-00 $665.76 536-252-03-00 $1,331.52 537-311-20-00 $986.16 615-062-04-00 $665.76 536-252-04-00 $665.76 537-311-21-00 $665.76 615-062-05-00 $665.76 536-252-05-00 $665.76 537-311-22-00 $986.16 615-062-06-00 $665.76 536-252-06-00 $665.76 537-311-23-00 $665.76 615-062-07-00 $665.76 536-252-07-00 $665.76 537-311-24-00 $986.16 615-062-08-00 $665.76 536-252-15-00 $986.16 537-311-25-00 $665.76 615-062-09-00 $665.76 536-252-19-00 $665.76 537-311-26-00 $665.76 615-062-10-00 $665.76 536-252-20-00 $665.76 537-311-27-00 $665.76 615-062-11-00 $665.76 536-252-21-00 $665.76 537-311-28-00 $665.76 615-062-12-00 $665.76 536-252-22-00 $986.16 537-312-01-00 $665.76 615-062-13-00 $665.76 536-252-23-00 $665.76 537-312-02-00 $665.76 615-062-14-00 $665.76 536-252-24-00 $665.76 537-312-03-00 $665.76 615-062-15-00 $665.76 536-252-25-00 $665.76 537-312-04-00 $665.76 615-062-16-00 $665.76 536-252-26-00 $665.76 537-312-06-01 $320.40 615-062-17-00 $665.76 536-252-27-00 $665.76 537-312-06-02 $320.40 615-062-18-00 $665.76 536-252-31-00 $665.76 537-312-08-00 $986.16 615-062-19-00 $665.76 536-252-33-00 $665.76 537-312-09-00 $986.16 615-062-20-00 $665.76 536-252-34-00 $665.76 537-312-10-00 $665.76 615-062-21-00 $665.76 536-252-35-00 $665.76 537-312-11-00 $665.76 615-062-22-00 $665.76 536-252-53-00 $665.76 537-312-12-00 $665.76 615-062-23-00 $665.76 536-252-54-00 $986.16 537-312-13-00 $665.76 615-062-24-00 $665.76 536-252-55-00 $665.76 537-312-14-01 $320.40 615-062-25-00 $665.76 536-252-56-00 $665.76 537-312-14-02 $320.40 615-062-26-00 $665.76 536-252-57-00 $1,306.56 537-312-14-03 $320.40 615-062-27-00 $665.76 536-252-58-00 $1,306.56 537-312-14-04 $320.40 615-062-28-00 $665.76 536-260-03-00 $665.76 537-313-01-00 $665.76 615-062-29-00 $665.76 536-260-04-00 $665.76 537-313-02-00 $665.76 615-062-30-00 $665.76 536-260-05-00 $986.16 537-313-03-00 $665.76 615-062-31-00 $665.76 536-260-06-00 $665.76 537-313-04-00 $665.76 615-062-32-00 $665.76 536-260-07-00 $665.76 537-313-05-00 $665.76 615-062-33-00 $665.76
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 391
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-260-08-00 $665.76 537-313-06-00 $665.76 615-062-34-00 $665.76 536-260-09-00 $665.76 537-313-09-00 $665.76 615-062-35-00 $665.76 536-260-10-00 $665.76 537-313-10-00 $665.76 615-062-36-00 $665.76 536-260-11-00 $665.76 537-313-11-00 $665.76 615-062-37-00 $665.76 536-260-12-00 $665.76 537-313-12-00 $665.76 615-062-38-00 $665.76 536-260-13-00 $665.76 537-313-13-00 $665.76 615-062-39-00 $665.76 536-260-14-00 $665.76 537-313-14-00 $665.76 615-062-40-00 $665.76 536-260-15-00 $665.76 537-313-15-00 $665.76 615-062-41-00 $665.76 536-260-16-00 $665.76 537-313-16-00 $665.76 615-062-42-00 $665.76 536-260-17-00 $665.76 537-313-17-00 $665.76 615-062-43-00 $665.76 536-260-18-00 $665.76 537-321-04-00 $986.16 615-062-44-00 $665.76 536-260-19-00 $986.16 537-321-06-00 $986.16 615-062-45-00 $665.76 536-260-20-00 $665.76 537-321-07-00 $665.76 615-062-46-00 $665.76 536-260-21-00 $986.16 537-321-08-00 $1,306.56 615-062-47-00 $665.76 536-260-22-00 $986.16 537-321-09-00 $1,306.56 615-062-48-00 $665.76 536-260-23-00 $665.76 537-321-11-00 $640.80 615-062-49-00 $665.76 536-260-24-00 $665.76 537-321-13-00 $665.76 615-062-53-00 $665.76 536-260-25-00 $665.76 537-321-14-01 $320.40 615-062-54-00 $665.76 536-260-26-00 $665.76 537-321-14-02 $320.40 615-062-55-00 $665.76 536-260-27-00 $665.76 537-321-14-03 $320.40 615-062-57-00 $665.76 536-260-28-00 $986.16 537-321-15-00 $986.16 615-062-58-00 $665.76 536-260-29-00 $665.76 537-321-16-00 $1,922.40 615-062-59-00 $665.76 536-260-30-00 $665.76 537-321-17-00 $986.16 615-062-60-00 $665.76 536-260-31-00 $665.76 537-321-18-00 $986.16 615-062-61-00 $665.76 536-260-32-00 $665.76 537-321-19-00 $1,331.52 615-063-20-01 $320.40 536-260-33-00 $665.76 537-321-23-00 $665.76 615-063-20-02 $320.40 536-260-34-00 $665.76 537-321-24-00 $665.76 615-063-20-04 $320.40 536-260-35-00 $665.76 537-321-25-00 $1,281.60 615-063-20-05 $320.40 536-260-36-00 $665.76 537-321-26-00 $4,806.00 615-063-20-06 $320.40 536-260-37-00 $665.76 537-321-29-00 $665.76 615-063-20-08 $320.40 536-260-38-00 $665.76 537-321-30-01 $320.40 615-063-20-09 $320.40 536-271-01-00 $665.76 537-321-30-02 $320.40 615-063-20-10 $320.40 536-271-02-00 $665.76 537-321-30-03 $320.40 615-063-20-12 $320.40 536-271-05-00 $665.76 537-321-30-04 $320.40 615-063-20-13 $320.40 536-271-07-00 $665.76 537-321-30-05 $320.40 615-063-20-14 $320.40 536-271-08-00 $986.16 537-321-30-06 $320.40 615-063-20-16 $320.40 536-271-09-00 $665.76 537-321-31-00 $665.76 615-063-20-17 $320.40 536-271-10-00 $665.76 537-321-32-00 $665.76 615-063-20-18 $320.40 536-271-11-00 $665.76 537-321-33-00 $665.76 615-063-20-20 $320.40 536-271-12-00 $665.76 537-321-34-00 $665.76 615-063-20-21 $320.40 536-271-13-00 $665.76 537-321-35-00 $665.76 615-063-20-22 $320.40 536-271-14-00 $665.76 537-321-36-00 $665.76 615-063-20-24 $320.40 536-271-15-00 $665.76 537-321-37-01 $665.76 615-063-20-26 $320.40 536-271-16-00 $986.16 537-321-37-02 $665.76 615-063-20-27 $320.40 536-271-17-00 $665.76 537-321-38-01 $665.76 615-063-20-28 $320.40 536-271-18-00 $986.16 537-321-38-02 $665.76 615-063-20-30 $320.40 536-271-19-00 $665.76 537-322-02-00 $640.80 615-063-20-31 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 392
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-271-20-00 $665.76 537-322-03-00 $665.76 615-063-20-32 $320.40 536-271-21-00 $665.76 537-322-04-00 $1,947.36 615-063-20-34 $320.40 536-271-22-00 $665.76 537-322-05-00 $640.80 615-063-20-35 $320.40 536-271-23-00 $665.76 537-322-08-01 $665.76 615-063-20-36 $320.40 536-271-24-00 $665.76 537-322-08-02 $665.76 615-063-20-38 $320.40 536-271-25-00 $665.76 537-322-10-00 $640.80 615-063-20-39 $320.40 536-271-26-00 $665.76 537-322-11-00 $665.76 615-063-20-40 $320.40 536-271-27-00 $665.76 537-322-12-00 $986.16 615-063-20-42 $320.40 536-271-28-00 $665.76 537-322-13-00 $665.76 615-063-20-43 $320.40 536-271-29-00 $665.76 537-322-14-00 $665.76 615-063-20-44 $320.40 536-271-30-00 $665.76 537-322-15-00 $665.76 615-063-20-46 $320.40 536-271-31-00 $665.76 537-322-16-00 $665.76 615-063-20-47 $320.40 536-271-32-00 $665.76 537-322-17-00 $986.16 615-063-20-48 $320.40 536-271-33-00 $665.76 537-322-18-01 $320.40 615-063-20-50 $320.40 536-271-34-00 $665.76 537-322-18-02 $320.40 615-063-20-51 $320.40 536-271-35-00 $665.76 537-322-18-03 $320.40 615-063-20-52 $320.40 536-272-01-00 $665.76 537-322-19-00 $961.20 615-063-20-54 $320.40 536-272-02-00 $665.76 537-322-20-00 $665.76 615-063-20-55 $320.40 536-272-03-00 $665.76 537-322-21-00 $2,242.80 615-063-20-56 $320.40 536-272-04-00 $665.76 537-322-22-01 $320.40 615-063-20-58 $320.40 536-272-05-00 $665.76 537-322-22-02 $320.40 615-063-20-59 $320.40 536-272-06-00 $665.76 537-322-22-03 $320.40 615-063-20-60 $320.40 536-272-07-00 $665.76 537-322-23-00 $665.76 615-063-20-62 $320.40 536-272-08-00 $665.76 537-322-24-01 $665.76 615-063-20-63 $320.40 536-272-09-00 $986.16 537-322-24-02 $665.76 615-063-20-64 $320.40 536-272-10-00 $665.76 537-322-24-03 $665.76 615-063-20-66 $320.40 536-272-11-00 $665.76 537-322-28-00 $665.76 615-063-20-67 $320.40 536-272-12-00 $986.16 537-322-29-00 $665.76 615-063-20-68 $320.40 536-272-13-00 $665.76 537-322-30-01 $320.40 615-063-20-70 $320.40 536-272-14-00 $665.76 537-322-30-02 $320.40 615-063-20-71 $320.40 536-272-15-00 $665.76 537-322-30-03 $320.40 615-063-20-72 $320.40 536-272-16-00 $665.76 537-322-30-04 $320.40 615-063-20-74 $320.40 536-272-17-00 $665.76 537-322-30-05 $320.40 615-063-20-75 $320.40 536-272-18-00 $665.76 537-322-31-01 $320.40 615-063-20-76 $320.40 536-272-19-00 $665.76 537-322-31-02 $320.40 615-063-20-78 $320.40 536-272-20-00 $665.76 537-322-31-03 $320.40 615-063-20-79 $320.40 536-272-21-00 $665.76 537-322-31-04 $320.40 615-063-20-80 $320.40 536-272-22-00 $665.76 537-322-31-05 $320.40 615-063-20-82 $320.40 536-272-23-00 $665.76 537-322-32-00 $986.16 615-063-20-83 $320.40 536-272-24-00 $665.76 537-322-33-00 $665.76 615-063-20-84 $320.40 536-272-25-00 $986.16 537-322-34-01 $320.40 615-063-20-86 $320.40 536-272-26-00 $665.76 537-322-34-02 $320.40 615-063-20-87 $320.40 536-272-27-00 $665.76 537-322-34-03 $320.40 615-063-20-88 $320.40 536-272-28-00 $665.76 537-322-34-04 $320.40 615-063-20-90 $320.40 536-281-01-00 $665.76 537-322-35-01 $665.76 615-063-20-91 $320.40 536-281-02-00 $665.76 537-322-35-02 $665.76 615-063-20-92 $320.40 536-281-06-00 $665.76 537-322-36-01 $665.76 615-063-20-94 $320.40
Attachment 2
Item 7.a
July 21, 2026 City of Coronado Page 393
APPENDIX A
CITY OF CORONADO FY 2026-27 SEWER CHARGES BY ASSESSOR PARCEL NUMBER
APN SEWER CHARGE APN SEWER CHARGE APN SEWER CHARGE
536-281-07-00 $665.76 537-322-36-02 $665.76 615-063-20-95 $320.40 536-281-08-00 $986.16 537-331-01-00 $1,602.00 615-063-20-96 $320.40 536-281-10-00 $665.76 537-331-05-00 $1,602.00 615-064-01-00 $665.76 536-281-14-00 $665.76 537-331-06-00 $1,602.00 615-064-02-00 $665.76 536-281-15-00 $665.76 537-331-10-00 $0.00 615-064-03-00 $665.76 536-281-16-00 $665.76 537-331-11-01 $320.40 615-064-04-00 $665.76 536-281-17-00 $665.76 537-331-11-02 $320.40 615-064-05-00 $665.76 536-281-18-00 $665.76 537-331-12-01 $320.40 615-064-06-00 $665.76 536-281-19-00 $665.76 537-331-12-02 $320.40 615-064-07-00 $665.76 536-281-20-00 $1,306.56 537-331-13-00 $665.76 615-064-08-00 $665.76 536-281-22-00 $665.76 537-331-14-00 $665.76 615-064-09-00 $665.76 536-281-23-00 $665.76 537-331-15-00 $3,844.80 615-064-10-00 $665.76 536-281-24-00 $665.76 537-331-16-01 $665.76 615-064-11-00 $665.76 536-281-25-00 $1,331.52 537-331-16-02 $665.76 615-064-12-00 $665.76 536-281-26-00 $665.76 537-331-16-03 $665.76 615-064-13-00 $665.76 536-281-27-00 $665.76 537-331-17-01 $665.76 615-064-14-00 $665.76 536-281-28-00 $665.76 537-331-17-02 $665.76 615-064-15-00 $665.76 536-281-32-00 $665.76 537-331-17-03 $665.76 615-064-16-00 $665.76 536-281-33-00 $665.76 537-331-18-00 $986.16 615-064-17-00 $665.76 536-281-34-00 $665.76 537-331-21-00 $2,242.80 615-064-18-00 $665.76 536-281-35-00 $665.76 537-331-22-00 $986.16 615-064-19-00 $665.76 536-281-36-00 $665.76 537-331-23-00 $2,960.64 615-064-20-00 $665.76 536-281-37-00 $665.76 537-331-24-01 $320.40 615-064-21-00 $665.76 536-281-38-00 $665.76 537-331-24-02 $320.40 615-071-01-00 $665.76 536-281-39-00 $665.76 537-331-24-03 $320.40 615-071-02-00 $665.76 536-281-40-00 $665.76 537-331-24-04 $320.40 615-071-03-00 $665.76 536-281-41-00 $665.76 537-331-25-00 $1,922.40 615-071-04-00 $665.76 536-281-42-00 $1,306.56 537-331-26-01 $320.40 615-071-05-00 $665.76 536-281-43-00 $665.76 537-331-26-02 $320.40 615-071-06-00 $665.76 536-281-44-00 $665.76 537-331-26-03 $320.40 615-071-07-00 $665.76 536-281-47-00 $665.76 537-331-26-04 $320.40 615-071-08-00 $665.76 536-281-49-00 $665.76 537-331-26-05 $320.40 615-071-09-00 $665.76 536-282-01-00 $665.76 537-331-27-01 $320.40 615-071-10-00 $665.76 536-282-02-00 $1,331.52 537-331-27-02 $320.40 615-071-11-00 $665.76 536-282-03-00 $665.76 537-331-27-03 $320.40 615-071-12-00 $665.76 536-282-04-00 $665.76 537-331-27-04 $320.40 615-071-13-00 $665.76 536-282-05-00 $665.76 537-331-27-05 $320.40 615-071-14-00 $665.76 536-282-06-00 $665.76 537-331-27-06 $320.40 615-071-15-00 $665.76 536-282-07-00 $1,331.52 537-331-27-07 $320.40 615-071-16-00 $665.76 536-282-08-00 $665.76 537-331-28-01 $320.40 615-071-17-00 $665.76 536-282-09-00 $665.76 537-331-28-02 $320.40 615-071-18-00 $665.76 536-282-10-00 $665.76 537-331-28-03 $320.40 615-072-01-00 $665.76 536-282-11-00 $665.76 537-331-29-01 $320.40 615-072-02-00 $665.76 536-282-12-00 $665.76 537-331-29-02 $320.40 615-072-03-00 $665.76 536-282-13-00 $665.76 537-331-29-03 $320.40 615-072-04-00 $665.76 536-282-14-00 $665.76 537-331-30-01 $665.76 615-072-05-00 $665.76 536-282-20-01 $320.40 537-331-30-02 $665.76 615-072-06-00 $665.76