METHOD OF APPROACH
IMPLEMENTATION PLAN
The team proposed on this project have extensive experience in project management, construction management, construction inspection and design. We have successfully utilized CM/ PM Agency delivery on a host of projects.
Through this experience we have developed management procedures that promote collaboration and teamwork, improve quality and maximize the value of the above project. Z&K past performance with Cities, Counties, and other agencies shows our remarkable ability to control costs, guarantee great quality of work, and meet all project deadlines. We understand the importance of Schedule Control and are known in the industry for assisting the contractor to cut the project schedule and to yield significant savings for our clients through reduction of overhead management and construction costs. The most significant saving is less inconvenience to the traveling public and less City exposure due to shortened construction duration. This will help extend excess project funds into other important projects.
PROJECT MANAGEMENT APPROACH | The team proposed on these projects have extensive experience in project management, construction inspection, and construction management. We have successfully utilized PM/CM Agency delivery on a host of projects. Through this experience, we have developed project management procedures that promote collaboration and teamwork, improve quality and maximize the value of the above project. Z&K’s past performance with Cities, Counties, and other agencies shows our remarkable ability to control project costs, guarantee great quality of work, and meet all project deadlines. We understand the importance of adhering to the project budget and schedule control and are known in the industry for assisting the contractor to cut the project schedule and to yield significant savings for our clients through reduction of overhead construction management and construction costs. The most significant saving is less inconvenience to the traveling public and less public exposure due to shortened construction duration. This will help extend excess project funds into other important projects. Our firm is very experienced providing project management services. Our team provides program and project management to numerous agencies throughout Southern California and is very experienced in all of the project life cycles. We understand not only construction, but how to work with designers and architects as an extension of City staff.
Our Project Managers are licensed Professional Engineers have provided project management for many Cities.
They are experts at technical reviews of projects. They are known to push projects through, provide comprehensive constructability and cost savings options, and provide excellent final plans and specifications for bidding and construction. They are very thorough and ensure that the project plans and specifications are clear and inclusive, and do not leave gray areas for contractors to capitalize on. The constructability review will be crucial to the project success. A thorough constructability review of the improvements and the project specifications will be central to construction running smoothly. Z&K will have our proposed CM team, made up of licensed Professional Engineers and certified building officials, certified plan examiners, and certified building/structural/mechanical/electrical and plumbing inspectors perform constructability reviews. In addition to the CM teams review, we will have our in-house architects and structural and MEP designers perform a thorough constructability review.
Since our team will have the opportunity to be brought on during the design phase, we have had a lot of success with pre-purchasing long lead item materials on our projects. We work with the architect/designer to identify the crucial long lead items and procure these items around the 90% design. Some examples of the long lead items are the fire alarm, high performance sports lighting, mechanical equipment, traffic signal poles, etc. This helps architects/designers since they will be able to review the long lead i tem submittals prior to construction and will not be bombarded with all submittals at once. This also helps the project budget because the City avoids mark up on these items. The contractor also does not have to build in the risk of guaranteeing the pric e of the items for longer than the 30 days that vendors quote, so it provides less risk to the contractor and a better priced bid.
Since we are managing the projects, we have the opportunity to employ bidding strategies. In the current bidding environment, we have noticed that bids have been coming in significantly higher than the engineer’s estimate.
This creates problems and delays since the project funding was based on the engineer’s estimate. Due to the current bidding environment, the engineer’s estimate becomes outdated quickly. We have many options for addressing this. Z&K will thoroughly analyze the engineer’s estimate at 90% design and 100% design. Z&K has in-house designers in addition to our strong project management team that are very familiar with cost estimating and the current bidding environment. We will also discuss bidding strategies with the City to help mitigate the effects of the bidding environment. Z&K provides program and project management for many agencies and have created great bidding strategies to keep the bids within budget.
19 301
20 302
21 303
APPROACH TO PROJECTS & CLIENT SATISFACTION
STREET REHABILITATION AND IMPROVEMENT | To support the City with their Street Rehabilitation program, our team with their expertise and local knowledge can provide solutions to extend the life of local streets and major thoroughfares. Our team of roadway and traffic engineers uses a life cycle cost analysis to work towards a pavement design that reduces overall maintenance cost to the City. In addition to pavement repair, other roadway improvement considerations include sidewalks, curb ramps, curb and gutter and drainage correction.
SITE CIVIL, PARKING LOTS, ADA COMPLIANCE | Our strong experience with ADA compliance across a variety of clients gives our team the ability to quickly assess the challenges and develop the right solutions to improve pedestrian safety and accessibility. We consider both temporary and permanent impacts to the project site and adjacent properties in the development of solutions since construction activities will occur near residential and business areas. Based on very recent project experience , we are well-versed at assessing existing ramps and developing solution alternatives that comply with current ADA and municipal standards that minimize impacts to adjacent properties. Our team also has vast experience with civil design in existing and new parking lots for electric vehicle charging stations that must comply with local jurisdiction, EV manufacturer, utility company and ADA standards. We have developed unique and effective solutions when working within an existing parking lot with space constraints to minimize loss of parking stalls and impacts to both pedestrian and vehicular circulation.
DRAINAGE | Our Drainage Team has been providing design services in Orange County for over 15 years. studies have been conducted to identify deficiencies along PCH for a traffic rehabilitation and ADA upgrades project. This experience along with our understanding of the City’s flood protection requirements will provide the City of Costa Mesa with the team to successfully complete any drainage related projects. Our specialized and technical drainage engineers have prepared numerous drainage studies from complex hydrologic modeling to detailed storm drain design. We understand specific requirements and design standards set forth by the City. Our typical approach to drainage follows the same proven process applied to all projects. We take each step of the analysis to ensure that it meets not only the design criteria, but also sound engineering judgment. We eliminate unnecessary assumptions with calculations and documentations. Parameters used in the analysis have been carefully assessed. We don’t take the easy route of being conservative in our design. We make sure every design element has back-up calculations. Drainage Plans will be prepared to follow the City checklist such as catch basin locations, outlets, grading, flow direction, proposed easements, down drains and terrace drains, slopes, channels, and other structures.
TRAFFIC ANALYSIS | Our team will work closely with City’s Traffic Engineering team to review residents' and other stakeholders’ concerns regarding capital improvements, traffic operation and analysis, traffic safety and relevant tasks such as parking demand, traffic control devices, traffic simulation, schools and in general, traffic circulation and traffic operation matters and address their concerns.
We are experienced in performing roadside safety
analysis and traffic safety studies for intersections, pedestrian crossings, bicycle paths, schools, and other areas where the City has a safety concern. Our traffic team can evaluate the need for traffic control devices and lighting conditions to provide improvement plans and alternatives for traffic calming measures. We will conduct site visits to collect required data and relevant information to evaluate the existing condition and utilize appropriate measures and tools to develop effective approaches to address any issues. We have been working with Caltrans and local municipalities and is very familiar with existing guidelines, manuals, specifications, and applicable tools.
We will provide reports to meet Caltrans requirements for TOAR, ICE, DSDD and PEER and other documents.
CONSTRUCTION MANAGEMENT | The Construction Management Team prides itself in delivery projects from cradle to grave. We services begin with constructability reviews for projects that will be anticipate to be list for bid. Our thorough reviews include our findings, potential solutions, and any impacts to the contract. We will meet with the Designer to rectify any matters that may come up, so we ultimately have a buildable and billable b id document. Our services continue throughout the bid phase where we can summarize a validate the bids for the projects. Once bids are received, we will perform a bid analysis with the use of a Bid Summary spreadsheet to assess the most responsive bidder and determine the lowest bidder. We will also assist the City in the preparation of the contract award package and agenda items for City Council meetings. We will also support the City in preparing for the Pre -Construction meeting.
During construction we wi ll provide services that may include roadway inspection, structures inspection, answering RFI’s, submittal revies, shop plan reviews, drafting change orders, claims support, scheduling and review pay estimates. Our team is committed to closing out most projects within 2 months. This includes as-built drawings and providing all documents for the City’s archiving. All documents will be provided both in a hard-copy format as well as electronic copies in an external hard drive for the City’s usage.
22 304
23 305
CITY OF CHINO | ON-CALL SERVICES
Z&K Consultants, Inc. is providing Engineering, Project Management, Construction Management, and Construction Inspection Services for this long -term, on-call contract for the City of Chino. The Z&K team has served a wide range of projects, which includes the following:
• 16th, 17th, & 18th St. Between Tronkeel Ave.
and Tangerine Ave. Street Widening Project
• Ramona Ave. and Walnut Ave. Street
Rehabilitation and Traffic Signal Modifications
Project
• 11th St. Pavement Reconstruction Alley and
Intersection Accessibility Project
• CDBG Alley Project and Alley/Sanitation
Rehabilitation Project
• FY 20/21 Alley/Sanitation Rehabilitation Project
• 11th Street/B Street Project
• Kimball Ave Street Improvement Project
• G6220 - CDBG Alley Project, East-West North
Chino Avenue
• SN231 - Alley Rehabilitation Project - Pioneer St
from Monte Vista Ave to 5th St.
• SN221 - FY21/22 Alley Reconstruction Project
• ST222 - Kimball/El Prado/Central Traffic
Improvement Project
• ADA Grievance 21-004 Curb Ramps at Olive
Place & Walnut Ave
• Madison Street & Kellogg Ave Gap Closure
Project
• MS 222 Slurry Seal Program
• MS 202 & ST 221 Chino Avenue Accessibility and
Curb Ramp Improvements at 15th,17th and
19th Streets and Norton Avenue PCC Walk and
Curb Ramps
• NC231 Schaefer Ave Localized Asphalt Repairs
• ST162 Localized Asphalt Repairs Various
Locations
• R7200 Masonry Block Wall at Chino Police
Department
• Yorba Ave Street Improvements – From
Midblock between Chino Ave to Schaefer Ave
• F Street, G Street, 5th Street - Street
Improvements
• City Hall EMT Parking Lot Improvements
CITY OF NORWALK | CDBG LOCAL STREETS REHABILITATION PROJECT Z&K Consultants, Inc. is pro viding Construction Management and Inspection services for the Local Streets Rehabilitation Project, funded by the Community Development Block Grant (CDBG) fund. The scope of work includes improvements to concrete appurtenances, including cross gutters, cu rb and gutters, upgrades of curb ramps to ADA standards, electrical and lighting improvements, traffic signal improvements, landscaping improvement, drainage improvements, bike lanes, underground utility coordination, conduit installation, and rehabilitation of roadway pavement conditions. The Z&K Team provided engineering support, coordinated efforts between the City and the Contractor, reviewed and tracked RFIs, RFCs, and submittals, reviewed progress payment requests, performed constructability review of the plans and specifications, reviewed the contractor’s schedule, monitored overall project schedule and provided the City with updates of progress, provided public relations services, coordinated with public utilities, ensured compliance with the SWPPP, and coordinated inspection of the work.
CITY OF ALHAMBRA | FY 19-20 & 20-21 STREET REHABILITATION PROJECTS (TWO SEPARATE PHASES) The Z&K Team is performing construction management services for this project, which consists of the pavement and street rehabilitation of 23 local street segments located south of Mission Road, west of Garfield Avenue, east of Atlantic Boulevard, and north of Valley Boulevard. Improvements included slurry seal treatment, varying depths of cold mill and overlay, full depth removal and reconstruction, concrete improvements such as removal and replacement of broke and off-grade sidewalk, ADA ramps that need updating, broke and off-grade curb and gutter, driveway aprons in need or repairs, and concrete cross gutter reconstruction. Z&K provided services such as shop drawing and submittal review, daily inspection and documentation, coordination with contractor, review of contractor pay applications to verify quantities, NPDES inspection and reporting, NPDES inspection and reporting, collection of material deliveries, and quality control services.
CITY OF COMPTON: ANNUAL RESIDENTIAL REHABILITATION PROJECT – PHASE 1 & 2 Z&K Consultants, Inc. provided Construction Management and Inspection Services for this Project, along with Converse Consultants as a subconsultant providing Geotechnical Engineering Services. The scope of work consists of clearing and grubbing, construction of cold mill and AC overlay, slurry seal application, HMA pavement, ARHM overlay, AC base course, aggregate base, full depth AC slot pavement, PCC sidewalk and pavement, PCC curb and gutters, PCC cross gutter, alley intersection, sidewalk, driveway approach, curb ramps including detectable warning surfaces, PCC bus pad construction, signing, striping, markings, pavement legends, speed hump, landscaping, irrigation, storm drain and pipeline improvements, adjusting manhole and utility covers to grade, water valve, water meter, street lighting, installation of loop detectors and bicycle loop detectors, traffic signal improvement, adjustment of streetlight and traffic signal pull boxes to grade.
24 306
25 307
26 308
EXP PROJECT EXPERIENCE
CITY OF CHINO | PHILADELPHIA ST. & MONTE VISTA AVE. MDP SYSTEM 22 The City of Chino Master Plan of Drainage (MPD) was developed in 1993 to recommend the most viable and cost- effective storm drain facilities to relieve the existing deficiencies and meet future needs. The project scope includes: install storm drain along Monte Vista Avenue and Philadelphia Street, connect the proposed storm drain to the existing double reinforced concrete box in Chino storm drain, install new catchbasins to capture surface flow, and also install lateral connections to the new storm drain.
CITY OF CHINO | PINE AVENUE EXTENSION TO STATE ROUTE 71 The project consists of widening SR-71 northbound and southbound off ramps to increase the ramps capacities, install a traffic signal at the SR-71 northbound off ramp to Pine Avenue and restripe the overcrossing between the SR-71 northbound and southbound off ramps in the cities of Chino and Chino Hills in San Bernardino County.
Scope of Work: The need and purpose of the project is to improve the operational efficiency of the interchange. The addition of a right-turn lane at both off-ramps, is expected to significantly improve the operation of the intersections. by reducing delays and queues and improve the overall level of service of the intersection. EXP team is responsible for the Engineering Studies and Right of Way/Utilities, Project Management and complete PS&E package.
CITY OF SEAL BEACH | CIVIL ENGINEERING ON-CALL
EXP is providing comprehensive professional civil engineering services on an on-call/as-needed basis that include developing plans, technical specifications and estimates, bid support, construction management, survey, geotechnical, community outreach, public/private development plans, processing required permits and agreements, hydrology and hydraulic analysis, water and sewers studies, National Pollutant Discharge Elimination System (NPDES), Water Quality Management Plan (WQMP), Storm Water Pollution Preve ntion Plans (SWPPP), Grant Writing and Coastal Commissioning coordination. Task Orders: City of Seal Beach Annual Paving Program:
The City of Seal Beach is proposing to Mill and Overlay four residential streets as well Main Street which intersects the Major State Highway Pacific Coast Highway. The current asphalt is sub -standard with multiple areas with alligator crack failures. EXP recently developed plans, technical specifications and estimates for the Annual Paving Program and was instrumental in providing the IFB package on schedule for the City’s procurement of a contractor. Services include roadway geometric design, Traffic Control Plan, and plan production.
ORANGE COUNTY PUBLIC WORKS | ADA UPGRADES, NORTHEAST TUSTIN The purpose of these ADA upgrades project is to bring the curb ramps to compliance with the 2010 ADA Federal Standards, and to the California Title 24 Disabled Access Requirements. These upgrades will enhance mobility by removing obstacles within the path of travel. In addition, compliant curb ramps benefit wheelchair users by allowing a smooth transition from sidewalk to street and informing the visually impaired of an approaching vehicular travel lane. The proposed project will provide accessibility for pedestrians and wheelchair users with mobility issues and/or other physical impairments. Also, the project will prevent potential injuries and improve comfort for pedestrians.
CALTRANS DISTRICT 12 | SR-1 TRAFFIC SIGNAL UPGRADES AND PAVEMENT REHABILITATION Upgrade Traffic Signal project located on SR 1 between Crystal Heights Drive and First Street, in the cities of Newport Beach, Huntington Beach, and Seal Beach in Orange County. The proposed project lim it is between Crystal Height Drive and First Street in the cities of Newport Beach, Huntington Beach, and Seal Beach. This project would improve 20 intersections between PM 13.0 and PM 33.6. The proposed improvements for this location are to remove and replace the existing traffic signals and equipment due to age and serviceability with current Caltrans standard traffic signals and equipment, upgrade the existing curb ramps to the current ADA standards, relocate/adjust the existing drainage facility due to ADA curb ramp improvements, trim the existing median island, and remove the existing pedestrian push button on the median island.
27 309
28 310
29 311
30 312
31 313
BRITTANY DUHN, PE
Ms. Duhn has extensive experience of program management and project management of major public works and capital improvement projects including transportation, street improvements, roadway widenings, bridges, parks, water and wastewater projects, involving flood risk management, water conservation facilities, water mains, pressure regulating and pumping stations, wells, valves, fittings, and other appurtenances, reservoirs, channels, and storm drains, as well as access roads, culverts, and bridges.
Her recent program and project management experience,
managing the City of Chino water/wastewater projects and a $110 million dollar Wastewater Treatment Plant Expansion and Renovation & Brine Pipeline Project in the city of Beaumont, is a great testament of Britt any’s program management and oversight project experience
. Brittany provided complete project management and
construction management services on this project from inception to substantial completion. She is knowledgeable of the latest construction practices and requirements, communicates effectively, and possesses computer usage and writing skills. His experience includes an extensive background in construction management and inspection, construction contracting, project management, qua lity control and assurance, and project coordination He has excellent skills in understanding construction contracts, review and control project cost and schedule, coordinate and assist in negotiating change orders, provide project updates to the client, ensure timely review of critical path method (CPM) schedule to track any changes in critical path and delays, maintain project as -builts, managing multiple subconsultants and supervise inspection staff. Ms. Duhn provided construction and project management services that included conceptual, 30%, 60%, 90 % and 100% design review and support. She has provided Project Management services for all stages of projects, from design to construction.
Brittany managed and oversaw the discretionary review process of CEQA guidelines and requirements, managed budgets and schedules, assisted with the development of budgets, prepared RFPs, prepared sewer rate fees, provided public assistance and information of water and wastewater affecting the community, prepared reports for committees, commissions, and City Council, prepared staff reports, and made oral presentations. Ms. Duhn has a strong background in the fields of water, wastewater, and recycled water engineering design, operations, and construction.
Relevent Project Experience
City of Chino: On-Call Project Management | Project Manager: Brittany is a Project Manager on various enterprise projects including:
• SD223 - Chino Avenue Storm Drain Improvement
Plan System
• SD222 - Philadelphia Street and Monte Vista Avenue
Storm Drain Extension Project
• WA212 - State Street Water Treatment Plant
• WA214 – Well 17 Equipping Project
• WA224 - B Street Alley Water Main Line
Replacement Project
• WA231 - Wells 4 & 6 Treatment Plant Project
• WA223 - Russell Ave Waterline Replacement Project
• WA17B - Chino Quad 1.2
• SW211 – Yorba Avenue & Eucalyptus Avenue Sewer
Main Line Replacement Project
• WA221 & WA222 - Central Avenue and Dupont
Avenue Waterline Project
• WA211 - Well 11 Pipeline Project
City of Chino: On-Call Project Management | Project Manager: Brittany is a Project Manager on various transportation projects including:
• G6220 - CDBG Alley Project, East-West North Chino
Avenue
• SN231 - Alley Rehabilitation Project - Pioneer St from Monte Vista Ave to 5th St.
• SN221 - FY21/22 Alley Reconstruction Project
• ST222 - Kimball/El Prado/Central Traffic
Improvement Project
• City of Chino – 16th, 17th, and 18th Street between
Tronkeel Avenue and Serene Avenue & Tangerine
Avenue Street Widening
• FY 20/21 Alley/Sanitation Rehab Project, Phase II
• Philadelphia Street and Monte Vista Avenue Storm
Drain Extension Project
• 11th Street Paveme nt Reconstruction Alley
Accessibility and Intersection Accessibility Project
• CDBG Alley Project and Alley/Sanitation Rehab
FY2021-22 Various Locations Project
• Ramona Avenue & Walnut Avenue Street
Rehabilitation and Traffic Signal Modifications
Project
• SD211 – 11th Street/B Street Project
• ST232 – Kimball Ave Street Improvement
• MS202 – ADA Grievance 21-004 Curb Ramps at Olive
Place & Walnut Ave
• SN211 – Alley Sanitation Rehab 20-21 Phase 1, II, and III
• ST223 – Madison St & Kellogg Ave Gap Closure
Project
EDUCATION
» BSCE - Civil Engineering,
California State Polytechnic
University, Pomona
LICENSES & REGISTRATION
» Professional Engineer, P.E.
State of California, #91078
» SWPPP (QSD) & (QSP)
Certificate #27609
» 30-Hr. Cal OSHA
» Defensive Driving Training
BRITTANY DUHN, PE, QSD/P
Project Manager (Designated POC)
32 314
RESUME
Portia Gonzalez, PE, QSD/QSP
Drainage Lead
Professional Registrations
• Professional Engineer (Civil): AZ,
CA
• Qualified SWPPP Developer
(QSD)
• Construction General Permit
Qualified SWPPP Practitioner
(QSP)
Education + Training
• M.S., Water Resources,
California State University-Long
Beach, 2010
• B.S. Civil Engineering, California
State Polytechnic University,
Pomona, CA, 1991
Affiliations + Member ships
• ASCE Orange County, Hydrology
and Hydraulics Executive
Committee Member
Key Projects:
*SR55 (I-5 to I-405), CA, USA
*I-10 Improvement Project, CA
*I-10/Jackson Interchange
Improvement, CA, USA
*I-405 Sepulveda Pass, CA, USA
*TCA Drainage Task Orders, CA
*Perkinsville/SR 78 Intersection
Project, CA
*I-405 Widening (I-605 to SR-55),
CA
*Gerald Desmond Bridge, CA
*Centennial Corridor Project, CA,
*SR-91/East Street Interchange
Project, CA
*City of San Juan Capistrano, Del
Obispo Road Improvement, San
Juan Capistrano, CA
*Katella Smart Street, Anaheim
*City of Laguna Beach Master
Storm Drain Plan, Laguna Beach,
*City of Chino Hills Master Storm
Drain Plan, Chino Hills, CA
*Agua Fria River and Gila Rivers
Analysis of Sand and Gravel
Operations,
*Zone A Floodplain Delineation
for Lower Centennial Wash
Portia Gonzalez brings more than 30 years of experience. She has served as project manager for various transportation projects in California, Arizona and Nevada. Her expertise includes project management, drainage design, hydrologic and hydraulic modeling, storm water management, 2D modeling, river modeling, floodplain delineation studies, storm drain master planning, detention basin design, bridge scour, roadway drainage and design, water resource planning, sediment transport and water distribution. She brings working knowledge of software such as AES, WSPG, HEC-HMS, HEC-6, HEC- RAS, Flow-Master, Storm CAD, CulvertMaster, InRoads Storm and ArcGIS.
She has worked with Caltrans (Districts 7, 8, 11 and 12), SBCTA, RCTC, OCTA, SANDAG and LA Metro, among others.
Project Experience
City of Beaumont, Master Drainage Plan (MDP) Line 2 Stage 1, Beaumont, CA The Beaumont Master Drainage Plan (MDP) Line 2 Stage 1 is a new major storm drain trunk line for the City of Beaumont between Chestnut Avenue and First Street. The project is to design a storm drain for the 100-year storm event from a large watershed. The storm drain will have to accommodate several existing and future systems in the Line 2 watershed including a future UPRR grade separation. The project also includes design of a detention basin to attenuate flows prior to discharging to the existing Berkshire channel. The EXP Team is providing the hydrology, hydraulics, geotechnical studies, storm drain design, environmental document, traffic control, utilities, right of way and UPRR and Caltrans coordination. Portia is serving as Project Manager.
City of Chino Philadelphia St. and Monte Vista Avenue MDP System 22, Chino, CA
The City of Chino Master Plan of Drainage (MPD) was developed in 1993 to recommend the most viable and cost-effective storm drain facilities to relieve the existing deficiencies and meet future needs. The project scope includes:
install a storm drain along Monte Vista Avenue and Philadelphia Street, connecting the proposed storm drain to the existing double -reinforced concrete box in the Chino storm drain, installing new catchbasins to capture surface flow, and also installing lateral connections to the new storm drain.
Portia serves as the Project Manager.
*City of Chino, Hills Storm Drain Master Plan, Chino Hills, CA The City’s Storm Drain Master Plan establishes an approach to creating a prioritized Capital Improvement Projects to mitigate the impacts of stormwater runoff in the City. This document identifies the steps taken to inventory and analyze the existing storm drain system, analyzes capacity restrictions within the storm drain networks and provides recommendations.
Portia was the Project Manager for a team of drainage engineers and GIS specialist that analyzed the existing drainage deficiencies throughout the City and provided a range of drainage concepts for the construction of future facilities required to serve the City at buildout of the General Plan and establishes criteria for selecting and prioritizing projects. AES Software was used to for the hydrology and hydraulic computation. Output data was extracted using a project specific programming. This data was then incorporated into the City’s GIS storm drain data base.
City of Temecula, Diaz Road Improvements, Temecula, CA, USA The project proposes to improve Diaz Road to a major arterial road between Cherry Street and Rancho California Road. Design elements includes roadway widening and extension, raised median, landscaping, curb and gutter, sidewalk and trail realignment, drainage facilities, and treatment BMPs.
Portia is responsible for the drainage analysis to comply with the City’s and Riverside County Flood Control District design criteria, WQMP and PS&E.
33 315
34 316
35 317
ZACK FAQIH, MSCE, PE, QSD/P C.B.O.
Construction Manager: This project included street rehabilitation of seven major City streets. Streets included were:
Caldwell Street, Myrrh Street, Grandee Avenue, 134th/Elva Avenue, Tajauta Avenue, Bradfield Avenue and Alondra Boulevard. Scope of work consisted of construction of cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutter, alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the plans and standard spec ifications. Scope included full -service construction management, pre -construction, management information system, reviewing traffic control plans, meetings, issues management, scheduling, cost control, labor compliance, reviewing RFIs and Submittals, chang e orders, dispute resolution, quality control/inspection, public relations, permits/environmental compliance, progress payments, monthly staff reports, site safety, as-builts drawings, final walkthrough, and project completion reports. Project is within schedule and budget. Project is on-going.
City of Costa Mesa: Citywide Parkway Maintenance, Street Rehabilitation and Slurry Seal Project, No. 21 -03, Costa Mesa, CA | Senior Construction Manager : This citywide street improvement program in the City of Costa Mesa involved mobilization, removal and reconstruction of curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, ADA curb ramps, removal and reconstruction of existing pavement, milling and overlaying with new asphalt, adjustment of manholes and utility covers to grade, application of slurry seal, crack sealing, traffic signing, striping and markings, traff ic markers and speed humps, installation of specialty and bicycle loop detectors, and implementation of traffic control. Mr.
Faqih performed value engineering and constructability review of the project plans and specifications, prepared permits, conducted preconstruction meeting, processed RFIs, submittals, and contract change orders, and managed compliance with federal and state funding requirements.
County of Riverside: I-215/Van Buren Interchange Improvement - Principal Assistant RE / Construction Manager Principal Assistant RE / Construction Manager for $32M project included the realignment of the Van Buren Boulevard, overcrossing bridge over 1 -215 freeway, westbound left turn lane and an eastbound dedicated right turn lane over the freeway, replacing existing railroad overcrossing with pre-cast structure. Roadway improvements included a right-turn lane for eastbound to nort hbound entrance ramp, and two westbound receiving lanes to accommodate the southbound exit ramp, new hook-type ramp, auxiliary lanes added to the mainline and the southbound main lane on I-215 were widened to the west to accommodate the ultimate configurat ion of the freeway. Five retaining walls up to 30 feet high were constructed along Railroad tracks/southbound on -ramp, southbound off ramp, north and south sides of Van Buren Blvd/west of the I -215 freeway, and east of northbound on -ramp to minimize impact to the railroad and MARB right -of- way. Additional features include curb ramps, sidewalk, cross walks, signal and electrical, water line, sewer line, and storm drain installation.
Parks & Public Facilities
City of Costa Mesa: Jack Hammett Sports Complex Improvement Project, Costa Mesa, CA | Senior Construction Manager:
This $2.3M project includes various improvements to the Jack Hammett Sports Complex, a 14.5 -acre park with six illuminated utility fields, a restroom building, picnic benches, and on -site parking. The project involves parking lot improvements, concrete flatwork, ADA improvements, electrical runs to the pull boxes for multiple storage buildings, retaining walls, lighting, irrigation and landscap ing, foundation improvements, construction and installation of two new storage buildings, electrical and mechanical work within the buildings, and all associated work with the buildings.
SilverRock Park Venue Site, City of La Quinta ($5.4M) – Construction Manager This project is a community park for passive use. The SilverRock Park Venue Project is located on the southeast corner of SilverRock Way and Avenue 52. The park site sits on approximately 14 acres with approximately eight (8) acres of walking paths, turf, and landscaping. Construction work includes but is not limited to precise grading, landscaping and irrigation, utility construction including a grinder pump, stream and lake construction with floating fountain, furnishing and installation of pump for lake, furnishing and installation of lighting, decomposed granite parking lot construction, concrete ADA parking space construction, concrete and decomposed walkways, construction of a stage, construction of outlet structures, construction of retaining walls, construction of an outdoor theater with seating area.
Veteran Sports Park at Tustin Legacy, Tustin, CA – Construction Manager/IOR This project is a $24M major capital improvement project for the City of Tustin. The project is a 31.5-acre sports community park bounded by Lansdowne Road, Valencia Avenue, and Severyns Road. Major improvements include infrastructure improvement, installation of drainage devices, water lines, gas line s, communication lines, interior roadway construction, and ADA compliant facilities such as sidewalks, driveways, curb ramps, and recreational buildings. Mr. Faqih monitored and observed all construction activities on this 31.5 -acre project site including major grading activities, AC & PCC paving, reinforced concrete channels, local street improvements, ADA compliant sidewalks, driveways, and curb ramps, curb & gutter, utility installation including water and sewer lines, landscape, and hardscape. Retaining wall, block wall and site fencing, safety inspection & reporting of daily construction activities, preparing and verifying field measurements for payment, monitoring, and verifying extra work invoices, coordinating field-testing and sampling. Project Scheduling (CPM), material testing, compression and rapture of concrete cylinders and soil sampling.
City of Yorba Linda, CA – Deputy Building Official
Provided plan checking and served as the inspections supervisor. Reviewed architectural, structural, plumbing, mechanical, electrical, acoustic, energy for residential, commercial, and industrial buildings. Supervised construction and the project management staff to assure compliance with the city’s requirements for building facilities, includ ing the city’s community center and the library expansion projects.
36 318
BRITTANY DUHN, PE
Ms. Duhn has extensive experience of program management and project management of major public works and capital improvement projects including transportation, street improvements, roadway widenings, bridges, water and wastewater projects, involving flood risk management, water conservation facilities, water mains, pressure regulating and pumping stations, wells, valves, fittings, and other appurtenances, reservoirs, channels, and storm drains, as well as access roads, culverts, and bridges.
Her recent program and project management experience, managing the City of Chino water/wastewater projects and a $110 million dollar Wastewater Treatment Plant Expansion and Renovation & Brine Pipeline Project in the city of Beaumont, is a great testament of Brittany’s program management and oversight project experience .
Brittany provided complete project management and construction management services on this project from inception to substantial completion. She is knowledgeable of the latest construction practices and requirements, communicates effectively, and possesses computer usage and writing skills. His experience includes an extensive background in construction management and inspection, construction contracting, project management, quality control and assurance, and project coordination He has excellent skills in understanding construction contracts, review and control project cost and schedule, coordinate and assist in negotiating change orders, provide project updates to the client, ensure timely review of critical path method (CPM) schedule to track any changes in critical path and delays, maintain project as -builts, managing multiple subconsultants and supervise inspection staff. Ms. Duhn provided construction and project management services that included conceptual, 30%, 60%, 90 % and 100% design review and support. She has provided Project Management services for all stages of projects, from design to construction.
Brittany managed and oversaw the discretionary review process of CEQA guidelines and requi rements, managed budgets and schedules, assisted with the development of budgets, prepared RFPs, prepared sewer rate fees, provided public assistance and information of water and wastewater affecting the community, prepared reports for committees, commissions, and City Council, prepared staff reports, and made oral presentations. Ms. Duhn has a strong background in the fields of water, wastewater, and recycled water engineering design, operations, and construction.
Relevent Project Experience
Enterprise
City of Chino: On-Call Project Management | Project Manager: Brittany is a Project Manager on various enterprise projects including:
• SD223 - Chino Avenue Storm Drain Improvement
Plan System
• SD222 - Philadelphia Street and Monte Vista Avenue
Storm Drain Extension Project
• WA212 - State Street Water Treatment Plant
• WA214 – Well 17 Equipping Project
• WA224 - B Street Alley Water Main Line
Replacement Project
• WA231 - Wells 4 & 6 Treatment Plant Project
• WA223 - Russell Ave Waterline Replacement Project
• WA17B - Chino Quad 1.2
• SW211 – Yorba Avenue & Eucalyptus Avenue Sewer
Main Line Replacement Project
• WA221 & WA222 - Central Avenue and Dupont
Avenue Waterline Project
• WA211 - Well 11 Pipeline Project
Wastewater
Treatment Plant Expansion/Renovation and Brine Pipeline Installation Project, City of Beaumont - Project Manager/Program Manager: Ms. Duhn provided Project Management Services for the City of Beaumont Project ($110M), sewer lift stations, and ot her sewer/pipeline projects. Brittany provided complete project management and construction management services on this project from inception to substantial completion. She prepared funding applications for CWSRF and IBank. Ms. Duhn managed the Proposition 218 process to increase the City’s sewer rates. This process included coordinating with the Utility Rate Consultant, City, and Beaumont Cherry Valley Water District to calculate the rates and prepare the rate study. She oversaw the City’s community meetings, community outreach for the Notice of Public Hearing, and City Council presentations and agenda items. After the rates were established, Ms. Duhn provided support to the City for customers with questions and concerns. Ms. Duhn managed the process the next year to recalculate the rates based on the new water data and implement the rates to provide a smooth transition for the City and customers. Ms. Duhn assisted in the IS/MND adoption process, CEQA guidelines and requirements, and coordinated with utilities/cities for the Brine Line
EDUCATION
» BSCE - Civil Engineering,
California State Polytechnic
University, Pomona
LICENSES & REGISTRATION
» Professional Engineer, P.E.
State of California, #91078
» SWPPP (QSD) & (QSP)
Certificate #27609
» 30-Hr. Cal OSHA
» Defensive Driving Training
BRITTANY DUHN, PE, QSD/P
Project Manager
37 319
BRITTANY DUHN, PE
Project permits. Ms. Duhn prepared Request for Proposals for Construction Management and bid packages for the three (3) contractors. She managed the constructability review process for the wastewater treatment plant project and brine line projects. Ms. Duhn tracked the budgets for the Wastewater Treatment Plant and Brine Line projects and documented all purchase orders/invoices. She prepared WWTP, Brine Line, and wastewater City Council staff reports for change orders, monthly updates, agreements, and other required items for Council. She assisted the City in any tasks necessary to ensure the Project stays on budget and meets any and all scheduled deadlines.
Transportation
City of Chino: On-Call Project Management | Project Manager: Brittany is a Project Manager on various transportation projects including:
• G6220 - CDBG Alley Project, East-West North Chino
Avenue
• SN231 - Alley Rehabilitation Project - Pioneer St from Monte Vista Ave to 5th St.
• SN221 - FY21/22 Alley Reconstruction Project
• ST222 - Kimball/El Prado/Central Traffic
Improvement Project
• City of Chino – 16th, 17th, and 18th Street between
Tronkeel Avenue and Serene Avenue & Tangerine
Avenue Street Widening
• FY 20/21 Alley/Sanitation Rehab Project, Phase II
• Philadelphia Street and Monte Vista Avenue Storm
Drain Extension Project
• 11th Street Pavement Reconstruction Alley
Accessibility and Intersection Accessibility Project
• CDBG Alley Project and Alley/Sanitation Rehab
FY2021-22 Various Locations Project
• Ramona Avenue & Walnut Avenue Street
Rehabilitation and Traffic Signal Modifications
Project
• SD211 – 11th Street/B Street Project
• ST232 – Kimball Ave Street Improvement
• MS202 – ADA Grievance 21-004 Curb Ramps at Olive
Place & Walnut Ave
• SN211 – Alley Sanitation Rehab 20-21 Phase 1, II, and III
• ST223 – Madison St & Kellogg Ave Gap Closure
Project
City of Compton | Annual Residential Rehabilitation Project (Construction Phase) | Project Manager | The scope of work consisted of asphalt overlay, clearing and grubbing, construction of cold mill and AC overlay, slurry seal application, HMA pavement, ARHM overlay, AC base course, aggregate base, full depth AC slot pavement, PCC sidewalk and pavement, PCC curb and gutters, PCC cross gutter, alley intersection, sidewalk, driveway approach, curb ramps including detectable warning surfaces, signing, stripin g, markings, pavement legends, speed hump, landscaping, irrigation, adjusting manhole and utility covers to grade, water valve, water meter, street lighting, installation of loop detectors and bicycle loop detectors, traffic signal modification, adjustment of streetlight and traffic signal pull boxes to grade.
Parks & Public Facilities
City of Lake Forest | Arbor Mini Parks & Neighborhood Park Renovations Project (Construction Phase) | Project Manager | This project includes removing existing hardscape, in stalling new landscaping and irrigation, and installing decorative iron fencing around the perimeter of the park site. Additional improvements include installation of new playground equipment and other park amenities, and the construction of a concrete walkway/exercise trail with exercise equipment. The Project also includes the installation of rubber surfacing, renovation of the existing shade structure, and the installation of new picnic tables and replacement of other existing site amenities.
City of Beaumont | Wastewater Treatment Plant & Brine Line (Design, Bidding & Construction Phase) | Project Manager | Ms. Duhn provided Project Management Services for the City of Beaumont Project ($110M), sewer lift stations, and other sewer/pipeline projects. She prepared funding applications for CWSRF and IBank. Ms. Duhn managed the Proposition 218 process to increase the City’s sewer rates. This process included coordinating with the Utility Rate Consultant, City, and Beaumont Cherry Valley Water District to calculate the rates and prepare the rate study. She oversaw the City’s community meetings, community outreach for the Notice of Public Hearing, and City Council presentations and agenda items. After the rates were established, Ms. Duhn provided support to the City for customers with questions and concerns. Ms. Duhn managed the process the next year to recalculate the rates based on the new water data and implement the rates to provide a smooth transition for the City and customers.
City of Costa Mesa | Jack Hammett Sports Complex Improvement Project (Bidding & Construction Phase) | Project Manager | Ms. Duhn is provi ding Project Management services for the City of Costa Mesa’s $2.3M Jack Hammett Sports Complex Improvement Project, which involves various improvements to the a 14.5 -acre park, which includes six illuminated utility fields, a restroom building, picnic benches, and on-site parking. The project involves hardscape improvements, ADA parking lot improvements, concrete flatwork, ADA sidewalk improvements, electrical runs to the pull boxes for multiple storage buildings, retaining walls, fencing installation, improvements to lighting, irrigation and landscaping, rough and precise grading, foundation improvements, construction and installation of two new storage buildings, electrical and mechanical work within the buildings, finish grading, flat work and all associated work with the buildings.
38 320
39 321
utility coordination, monitored the project site for safety, maintained public relations with surrounding residents and businesses, and ensured SWPPP compliance.
City of Vernon: 50 th Street Water Main Replacement Project, Vernon, CA | Construction Manager: The project’s scope of work includes demolition and reconstruction of the 12” iron ductile pipeline to the City’s existing water services, such a s installation of all appurtenances, fittings, valves, blow -offs, siphons, concrete pipe supports, thrust blocks, trenching, bedding and backfill, replacement of traffic markings, shoring, over excavation, temporary and permanent pavement, steel plating, and roadway improvements and repair, installation of commercial services and laterals, pressure testing and disinfection of installed pipeline. Mr. Dawson provided construction inspection for this project with daily tasks including inspection of pipeline welding and installation, inspection of the project site to ensure safety and compliance with SWPPP, preparation of daily reports, change order review, and quantity calculations.
City of Lake Forest: Street Resurfacing Program, Lake Forest, CA | Construction Manager:
Mr. Flores is performing
construction inspection services for this project, which involves the street resurfacing of Glenn Ranch Road from Portola Parkway to El Toro Road, as well as the slurry seal of and arterial slurry seal of Jeronimo and Muirlands from Los Alisos to Bake. Relevant project features include street resurfacing and rehabilitation, application of slurry seal, grinding and overlay, cold milling, ARHM pav ement, AC base course, aggregate base, curb and gutters, ADA ramp construction, intersection improvements, traffic signal hardware installation, fiber optic utility coordination, traffic signal loops, signing striping, markings and pavement legends, dig-outs, sewer and storm drain manholes, and water valves and meters.
City of Hesperia and SANBAG: I 15/Ranchero Road Overcrossing Project - Construction Manager: This $50M dollar project was for construction of a new 8 -lane overcrossing bridge and temporary on and off ramps for I -15 both Northbound and Southbound. The project consisted of the construction of new off and on ramps for both Northbound and Southbound, new drainage systems. Mr. F lores worked extensively on all bridge items including, bu t not limited to: bridge pours, pile driving, rebar, backfilling, four -scale grades, field grades, calculating bridge quantities, and falsework construction during day, night, and full closures. In addition, he performed the necessary calculations for falsework review and bridge clearance forms. He inspected roadway excavation, base and sub-base work, grading, AC/PCC pavement, delineation, sign installation, traffic control.
Infill Housing Street Rehabilitation Improvements of Five Major Streets, City of San Bernardino, CA Construction Manager: The project includes concrete improvements and pavement improvements of five major streets in the City of San Bernardino. Streets are as follows: 21st Street, Genevieve Street, Union Street, E Street, and 8th Street. The project also included the rehabilitation and resurfacing of various street intersections. Project included street rehabilitation and resurfacing, full depth removal and replacement of asphalt concrete, cold milling and overlay of existing asphalt concrete, removal of traffic striping, installation of traffic striping and pavement markers, and construction of cross walks.
The concrete improvements included the removal and replacement of sidewalk, driveways, curb and gutter, gross gutters, spandrels, curb ramps along both residential and commercial streets. Additional improvements included cross gutters, curb & gutter, survey monument reestablishment, traffic striping, manhole/utility vault adjustments, replacement of traffic signal loop detectors, and storm drain catch basin adjustment. The project cost was approximately $2.8 Million.
Pavement Rehabilitation and Resurfacing Eleven Major Streets, City of San Bernardino, CA Construction Manager: Project included the pavement rehabilitation and resurfacing of 11 major City streets including North Sierra Way, Valencia Avenue, Baseline Street, North Arrowhead Avenue, Mountain View Avenue, Wabash Street, Olive Street, Waterman Avenue, Temple Street, and Victoria Street. Mr. Flores performed constructability reviews of the project plans and specifications prior to the bid release, and full-service construction management and construction inspection for pre-construction, construction, and project close out of all 11 major City streets. Technical project features include: full depth asphalt concrete removal and replacement, cold mill and overlay of existing asphalt concrete, removal and replacement of sidewalk, curb ramps, curb and gutter, cross gutters, spandrels, cross walks, traffic striping and pavement markers, concrete and asphalt speed humps, traffic signal improvements, adjustment of numerous existing utility manholes, and storm drainage improvement. The project cost is approximately $5.5 Million.
Yvonne Burke John Ham Park & Community Center, City of Lynwood, CA Construction Manager : This project was a 36,000 sf park and community center. The project included educational classrooms, multi-purpose rooms, exercise and wellness center, commercial kitchen. The foundation system was a unique mat foundation. This project was designed for a silver LEED rating and is on track for gold attainment. Project progress is being monitored for compliance with special funding under state proposition 84 requirements. Project technical features include: concrete walkways, curb ramps, landscaping, irrigation, lighting, community center, restrooms, retaining walls, parking lot, curb and gutter, site fencing, mass and precise grading, and utility installation. This project was completed ahead of schedule, within scope, and within budget. Total cost of project was $4.7M.
40 322
41 323
THOMAS DAWSON, CBO, IC C Certified
County Sanitation District (OCSD). Mr. Dawson provided construction inspection for this project with daily tasks including:
inspection of pipeline installation, inspection of the project site to ensure safety and compliance with SWPPP, preparation of daily reports, change order review, and quantity calculations for contractors progress pay estimate. Mr. Dawson understands and is proficient at various maintenance of plan operations, MOPO.
Secondary Treatment Facility, Whittier Narrows Water Reclamation Plant, Los Angeles County Sanitation Districts, Whittier, CA. Senior Electr
ical/Construction Inspector. This $9M project constructed a new RAS pump station and pipe gallery and installed process air compresses, fine air diffusion, mechanical piping, pumping equipment, power, and controls. Mr.
Dawson understands and is proficient at various maintenance of plan operations, MOPO. Mr. Dawson conducted MOPO meetings at project site prior to commencing shutdown for tie- in or modification of specific plant systems. Mr. Dawson reviewed the contractors submitted MOPO including conditions of shutdown, preparation, and installation procedures.
Transportation
City of Compton: Annual Residential Rehabilitation Project ($5.4M) Lead Construction Inspector: This project included street rehabilitation of seven major City streets. Streets included were:
Caldwell Street, Myrrh Street, Grandee Avenue, 134th/Elva Avenue, Tajauta Avenue, Bradfield Avenue and Alondra Boulevard. Scope of work consisted of construction of cold mill, ARHM pavement, AC base course, aggregate base, full depth AC slot pavement, curb and gutters, sidewalks, cross gutter, alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the plans and standard specifications. Scope included full -service construction management, pre-construction, management information system, reviewing traffic control plans, meetings, issues management, scheduling, cost control, labor compliance, reviewing RFIs and Submittals, change orders, dispute resolution, quality control/inspection, public relations, permits/environmental compliance, progress payments, monthly staff reports, site safety, as-builts drawings, final walkthrough, and project completion reports. Project is within schedule and budget. Project is on-going.
Caltrans District 5: SR-264 Paving, Buellton, California Senior Construction Inspector for the project to repair failed roadway areas, cold plane roadway, and repave RHMA on Route 264 from Route 101/264 separation to Santa Rosa Creek (~6 miles). Project was completed within schedule and within project budget.
Pavement Rehabilitation Program – Winchester Road (Jefferson Avenue to Ynez Road), City of Temecula, CA Senior Construction Inspector: for the City of Temecula pavement rehabilitation program. The work for this project generally includes pavement Improvements along Winchester Road from Jefferson Avenue to Ynez Road. Improvements Include, remove and replace existing asphalt pavement, reconstruction of traffic loops, adjust existing manholes and valves for different utilities, and installation of striping and pavement markers. The project cost is approximately $1.4 million.
Technical Features include: Remove and replace existing asphalt pavement, Reconstruction of Traffic loops, Adjust Manholes, Sidewalk, Curb ramps, driveways, Adjust Valves for different utilities, Installation of Striping, Pavement Markers.
Project was completed within schedule and within project budget.
Street Rehabilitation and Resurfacing of Ten City Streets, City of San Bernardino, CA Senior Construction Inspector: This project included the street rehabilitation and resurfacing of 10 City residential and commercial streets. The project technical features include: resurfacing; concrete overlays; unclassified excavation/fill; coldmill & overlay; removal of existing si dewalk, curb and gutter; driveway approaches, and speed humps; and the construction of sidewalk, curb ramps, cross walks, cross gutters, driveway approaches, and asphalt and concrete improvements of several City streets. The project also includes tree removals and several manhole/utility adjustments. The project cost is approximately $5.1 Million.
City of Moreno Valley | 801-0081 Citywide Pavement Rehabilitation Project 18/19 Senior Construction Inspector: The project is a citywide rehab of Moreno Valley C ity Streets. As per plan, it includes cold milling to 1.5” and place 1.5” ARHM asphalt, curb ramps, curb and gutter, cross gutter and spandrels, full depth asphalt removal and replacement, installation of traffic striping and placement of traffic markers, adjustment of existing utility manholes, and asphalt concrete overlay.
County of Riverside: I-215/Van Buren Interchange Improvement Senior Construction Inspector, I-215/Van Buren Interchange Improvement is a $32M project that included the realignment of the Van Buren Boulevard, overcrossing bridge over 1-215 freeway, westbound left turn lane and an eastbound dedicated right turn lane over the freeway, replacing exis ting railroad overcrossing with pre-cast structure. Roadway improvements included a right -turn lane for eastbound to northbound entrance ramp, and two westbound receiving lanes to accommodate the southbound exit ramp, new hook-type ramp, auxiliary lanes added to the mainline and the southbound main lane on I-215 were widened to the west to accommodate the ultimate configuration of the freeway. Five retaining walls up to 30 feet high were constructed along Railroad tracks/southbound on- ramp, southbound off r amp, north and south sides of Van Buren Blvd/west of the I-215 freeway, and east of northbound on-ramp to minimize impact the railroad and MARB right-of-way. Mr. Dawson provided inspection for roadway, traffic control, compliance with the SWPPP Plan, and ADA compliance. He assisted in contract change orders, RFIs, and submittals preparation, review, and analysis. Mr. Dawson assisted in measurement and filling out required ADA forms after project completion and forwarded documentation to
42 324
THOMAS DAWSON, CBO, IC C Certified
Caltrans ADA compliance unit. He worked with Caltrans and the local agencies for final approval and sign off. The ADA inspection included sidewalk, curb ramps, and curb cuts. He worked with the office engineer and Caltrans audit oversite resident engineer to ensure project documentation compliance with the Local Assistance Procedures Manuel and Caltrans filing system. Additional relevant project features include traffic signals, streetlight installation, drainage improvements, water lines, sewer lines, fencing, landscaping and irrigation, street striping, and paving (PCC & asphalt pavement).
Caltrans District 5: SR-264 Paving, Buellton, California Senior Construction Inspector for the proj ect to repair failed roadway areas, cold plane roadway, and repave RHMA on Route 264 from Route 101/264 separation to Santa Rosa Creek (~6 miles).
Pavement Rehabilitation Program – Winchester Road (Jefferson Avenue to Ynez Road), City of Temecula, CA Senior Construction Inspector: for the City of Temecula pavement rehabilitation program. The work for this project generally includes pavement Improvements along Winchester Road from Jefferson Avenue to Ynez Road. Improvements Include, remove and replace existing asphalt pavement, reconstruction of traffic loops, adjust existing manholes and valves for different utilities, and installation of striping and pavement markers. The project cost is approximately $1.4 million.
Technical Features include: Remove and replace existing asphalt pavement, Reconstruction of Traffic loops, Adjust Manholes, Sidewalk, Curb ramps, driveways, Adjust Valves for different utilities, Installation of Striping, Pavement Markers.
City of Moreno Valley | 801-0081 Citywide Pavement Rehabilitation Project 18/19 Senior Construction Inspector: The project is a citywide rehab of Moreno Valley City Streets. As per plan, it includes cold milling to 1.5” and place 1.5” ARHM asphalt, curb ramps, curb and gutter, cross gutter and sp andrels, full depth asphalt removal and replacement, installation of traffic striping and placement of traffic markers, adjustment of existing utility manholes, and asphalt concrete overlay.
County of Riverside Magnolia Avenue Grade Separation, Riverside/Corona, CA Senior Construction Inspector: for Magnolia Project to construct a railroad grade separation at the (BNSF) Burlington Northern-Santa Fe Railroad and Magnolia Avenue at Grade crossing, including a new four-lane overhead structure (bridge) over existing BNSF tracks supported by 9 bents and 2 abutments. Substructure comprises of 13’ diameter x 88’- ~100’ deep CIDH piles (total 18 CIDH piles @ 2 piles per bent). Both bridge approaches are supported by Retaining Walls/MSE Walls systems on both ends, multiple walls systems for pedestrian and vehicular support. Construction of temporary MSE walls, shoring, and casing support system to facilitate construction of CIDH piling, stage construction on both approaches, and temporary bridge over Arlington channel to support temporary detour at the east end of the project. Responsibilities included inspections of the installation of the falsework and shoring systems all throughout the project. Inspections of the large diameter (13’) CIDH, Coordinated flagging operations with BNSF/UPRR and coordinated all structures source inspections , prepares and documented all project activities with captioned photos.
Special Revenue Group
SilverRock Park Venue Site, City of La Quinta ($5.4M) – Senior Construction Inspector This project is a community park for passive use. The SilverRock Park Venue Project is located on the southeast corner of SilverRock Way and Avenue 52. The park site sits on approximately 14 acres with approximately eight (8) acres of walking paths, turf, and landscaping. Construction work includes but is not limited to precise grading, landscaping and irrigation, utility construction including a grinder pump, stream and lake construction with floating fountain, furnishing and installation of pump for lake, furnishing and installation of lighting, decomposed granite parking lot construction, concrete ADA parking space construction, concrete and decomposed walkways, construc tion of a stage, construction of outlet structures, construction of retaining walls, construction of an outdoor theater with seating area.
Veteran Sports Park at Tustin Legacy, Tustin, CA –Senior Construction Inspector This project is a $24M major capital improvement project for the City of Tustin. The project is a 31.5-acre sports community park bounded by Lansdowne Road, Valencia Avenue, and Severyns Road. Major improvements include infrastructure improvement, installation of drainage devices, water li nes, gas lines, communication lines, interior roadway construction, and ADA compliant facilities such as sidewalks, driveways, curb ramps, parking spaces, and recreational buildings. Mr.
Dawson provided construction inspection and deputy inspection for this project. Technical Project features also include:
major grading activities, AC & PCC paving, reinforced concrete channels, local street improvements, ADA compliant sidewalks, driveways, and curb ramps, curb & gutter, utility installation including water and sewer lines, landscape and irrigation, concrete walkways, lighting installation, water features, and hardscape. Retaining wall, block wall and site fencing.
Yvonne Burke John Ham Park & Community Center, City of Lynwood, CA – Senior Construction Inspector Mr. Dawson provided construction inspection and deputy inspection for this 36,000 sf park and community center. The project included educational classrooms, multi -purpose rooms, exercise and wellness center, commercial kitchen. The foundation system was a unique mat foundation. This project was designed for a silver LEED rating and is on track for gold attainment. Project progress is being monitored for compliance with special funding und er state proposition 84 requirements. Project technical features include: concrete walkways, curb ramps, landscaping, irrigation, lighting, community center, restrooms, retaining walls, parking lot, curb and gutter, site fencing, mass and precise grading, and utility installation. This project was completed ahead of schedule, within scope, and within budget. Total cost of project was $4.7M.
43 325
44 326
NOAH HERNANDEZ, CERTIFIE D PUBLIC WORKS INSPECTOR
streets, curb gutter, sidewalk, storm drains structures, sanitary sewers, check line, grade and size for conformance with plans and specifications. Observed, measured and examined sub grade for placement and compaction. Checked field grades for conformance to plans and surveys. Prepared and maintained a variety of records and reports related to project activities such as scheduling, measurements, quantities, contract change orders, daily activities and safety.
University Drive Widening between Campus Drive and MacArthur Boulevard, City of Irvine, CA. Senior Construction Inspector for the $11,472,300 street widening improvements project on University Drive. Inspected the removal of 86 Eucalyptus trees in the center median with coordination of a biologist due to nesting season for native birds along the Upper Newport Bay. Implemented traffic control modification per the traffic plans to allow construction of additional lanes in each direction. Coordinated relocation of Southern California Edison distribution, IRWD water mains, and Cox Communication facilities. Inspected installation of new traffic signals, controllers and appurtenances for the widening of University Drive.
Inspected the const ruction of 1500 linear feet of retaining wall including shoring and bracing. Inspected aggregate base placement for street widening, asphalt concrete base course placement, asphalt concrete cold- milling, pavement fabric installation, asphalt concrete pavement overlays and slurry seal application. Inspected the placement of concrete improvements such as sidewalks, ramps and curbs and gutters. Inspected tasks such as adjusting a survey monument, water valve, sewer cleanout and manhole frames and covers to grade. Inspected installation of striping and pavement markings, providing public notifications and traffic control.
2017-2018 Annual Street Rehabilitation and Slurry Seal, City of Irvine, CA. Senior Construction Inspector for the $7,299,000 2017-2018 Annua l Street Rehabilitation and Slurry Seal project. Inspection included asphalt pavement cold-milling, pavement fabric installation, asphalt concrete pavement overlays and slurry seal application. Also inspected removal and replacement of concrete improvement s such as sidewalks, ramps, curbs and gutters. Inspected tasks such as adjusting a survey monument, water valve, sewer cleanout and manhole frames and covers to grade and installation of striping and pavement markings, providing public notifications and traffic control.
Harvard Avenue Roadway and Streetscape Rehabilitation, City of Irvine, CA. Senior Construction Inspector for the for $1,230,00 improvements on Harvard Avenue project, from Stanford Court to Columbia Ave. Inspected removal/disposal of Stone Pines and replacement with Afghan Pines. Monitored removal and replacement of damaged concrete sidewalks, curb and gutter. Monitored modifications to curb ramps for ADA compliance. Inspected the cold milling of asphalt concrete pavement and placement of a pavement surface overlay.
Planned Area of development (PA) 5 and 6 Residential Development Project, City of Irvine/Irvine Company . Senior Construction Inspector for storm drain improvements. Inspected construction of 18 inch to 120 inches of reinforced - concrete pipe PA 5 and 6, Orchard Hills, including trench backfill, construction of catch basins, local depressions, manholes, junction structures, reinforced concrete box (6-foot-by-4-foot), installation of curb and gutter, sidewalk, street lights, cross gutter, access ramps, drive approaches, base paving, placement of asphalt leveling course, placement of ARHM overlay, PCC pavement, installation of new landscape and irrigation, traffic striping, markings and signage, traffic signal installation, and any other appurtenances necessary to complete the improvements.
Lakeview Senior Center Rehabilitation, City of Irvine, CA. Construction Inspector for project removing and replacing concrete hardscape, installing storm drain and drainage inlet. Reviewed block-wall repair, irrigation and landscaping improvements and removal and replacement of outdoor lighting. Monitored the cleaning and painting of shade structure block walls.
Kazan/Walnut Traffic Signal Improvements, City of Irvine, CA. Construction Inspector for the installation of new traffic signal at the intersection of Kazan and Walnut. The project included the installation of new traffic signal, safety lighting, controller and appurtenances associated with the traffic signal. Performed inspection for installation of new ADA ramps, the cold milling of asphalt concrete and placement of pavement surface overlay, signing and striping.
Construction Inspection Services, City of Fullerton, CA. Construction Inspector reviewing plans, specifications and inspecting construction projects for conformance with local, State and Federal standards, while implementing and maintaining full oversight of methods, materials, equipment, quantities and safety practices. Performed inspection of streets, curb and gutter, sidewalks, storm drain structures, sanitary sewers, checked line, grade and size for conformance with plans and specifications. Observed, measured and examined sub grade for placement and compaction. Reviewed field grades for conformance to plans and survey. Prepared and maintained a variety of records and reports related to project activities such as scheduling, measurements, quantities, contract change orders, daily activities and safety. Acted as liaison between property owners, businesses, City departments, utility companies and government agencies.
Longview Drive Water Main/Sewer main Replacement and Street Improvements, City of Fullerton, CA. Construction Inspector for water, sewer and street rehabilitation project. The project included replacing 2500 linear feet of 8 -inch DIP water main and appurtenances, 2500 linear feet of 8 -inch VCP, PVC SDR 26 sewer main, new manholes, r emoving and replacing existing sewer and video inspection and abandoning existing water mains and valves. Street and drainage improvement work included cold planning, excavation, asphalt concrete, aggregate base, curb and gutter, access ramps, cross gutter, driveway approach and sidewalk replacement.
Slurry Seal of Various Streets -Fiscal Year 2006 -07, City of Fullerton, CA. Senior Construction inspector to remove traffic striping and legends and apply Type 1 and 2 slurry seal to local streets. The project involved two major arterial streets and 60 residential streets. Construction required re-establishing survey monuments and re-striping all damaged or eradicated striping. Coordinated daily with city personnel, schools, trash collectors, emergency personnel and postal delivery.
45 327
46 328
GREGORY HUNKLE, CBO, ICC Certified
RO system will include two stage screening, grit removal, conventional aeration/biological treatment, and a membrane bioreactor process. The system will continue to utilize UV disinfecti on. The City is also constructing a 23 -mile, 12-inch diameter gravity pipeline from the Beaumont WWTP that will connect to the Inland Empire Brine Line (IEBL) in San Bernardino to discharge brine that will be treated at Orange County Sanitation District (OCSD). The Brine Line is installed within existing right-of-way and unpaved roads using open trench methods, auger jack and bore, and hydraulic directional drilling (HDD). Mr. Hunkle proactively coordinated with project purveyors including frequent coordina tion with SCE. Mr.
Hunkle understands and is proficient at various maintenance of plan operations – MOPO.
Victoria Avenue Recharge Water Facility, Riverside, CA - Inspector of Records/Lead Inspector : This major capital improvement project for Western Municipal Water District includes the installation of new groundwater extraction wells as a means to help increase the groundwater basin quantity and improve its quality. Major improvements on this projec t include: SCADA and Storage Building, mass grading operations, the installation of three stormwater basins, a divergent structure, numerous interior roadway improvements for vehicular and pedestrian access, two concrete trapezoidal rerouting channels into the water basin, stormwater collection structure, the installation of 4000 linear feet of 20” reclaimed water pipeline three local city streets connecting the gage canal reservoir into the three proposed storm water basins. Scada building included constru ction, installation, and furnish SCADA and storage building complete and in place including but not limited to masonry structure, doors, foundation, roofing, reinforcement, electrical switchgear, unit substation, motor load centers, control panels, switchboards, and motor control centers. Mr. Hunkle maintains project records and is the Inspector of Records for this major capital improvement project. His responsibilities include roadway construction inspection, material testing, traffic handling, flagging operations, inspection of concrete and paving activities.
He provides inspection of retaining walls, drainage improvements, water line installation, storm drain installation, sewer line installation, subdrains, ADA compliant sidewalk driveways, and SWPPP. He performs all deputy inspections as per project plans and specifications. Mr. Hunkle coordinates all field material testing and sampling and reviews the results for compliance to the project spec. He reviews the contractors submitted RFIs, CCOs, and concrete, material, and asphalt mix designs submittals and assures compliance with the approved project specs and documents. Mr. Hunkle conducted MOPO meetings at project site prior to commencing shutdown for tie -in or modification of specific plant systems. M r. Hunkle reviewed the contractors submitted MOPO including conditions of shutdown, preparation, and installation procedures.
Wastewater Reclamation Project, Phase I, Hi -Desert Water District, Yucca Valley, CA - Senior Construction/Electrical Inspector: The $93M Sewer Project is comprised of a wastewater treatment and reclamation facility, a collection system, and private property connections that will help property owners comply with the State’s mandated septic discharge prohibition dates. This project consists of three Phases. The collection System includes over 77 miles of pipeline in Phase One, with more to come in Phases 2 and 3. These pipes will transport wastewater that is collected from homes to the wastewater treatment facility. Existing streets where pipelines are installed will be removed and replaced with new roads.
The system will be predominantly gravity fed, reducing energy costs, with three lift stations helping move wastewater uphill where necessary. Pipes ranging from 8 inches to 24 inches in diameter will provide service up to the property line of homes, businesses, and vacant land. The Private Property Connections process includes abandoning existing septic tanks and connecting each property to the pipes in the street that make up the collection system. Mr. Hunkle reviewed the contractors submitted MOPO including conditions of shutdown, preparation, and installation procedures.
Transportation
City of San Marino: Street Rehabilitation Program, San Marino, CA | Senior Construction Inspector: Improvements include cold-milling asphalt concrete pavement and re- paving with HMA and ARHM, clearing and grubbing, localized pavement repairs, replacing impacted traffic striping, markings, pavement legends, loop detectors, curb painting, replacing damaged curb and gutter, curb ramps, cross gutters, sidewalks, driveways and driveway approaches, inspection and replacement of sewer manholes, coordinating with local utilities, preparation and implementation of SWPPP and BMPs, and providing temporary traffic control in conformance with the contract documents and applicable permits. Mr. Hunkle’s responsibilities included construction inspection, reviewing traffic control plans, issues management, cost control, labor compliance, dispute resolution, quality control/inspection, public relations, and ensuring site safety.
Slauson Avenue Revitalization, LACDPW $3M+.
Senior Construction Inspector: This project includes resurfacing of roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of concrete pavement and crosswalks, and streetscape improvements; and the performance of other appurtenant work.
Firestone Blvd. Street Rehabilitation, LACDPW $2.4M+.
Senior Construction Inspector: This project includes resurfacing of roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of concrete pavement and crosswalks, and streetscape improvements; and the performance of other appurtenant work.
Street Rehabilitation and Resurfacing of Ten City Streets, City of San Bernardino, CA Senior Construction Inspector:
This project included the street rehabilitation and resurfacing of 10 City residential and commercial streets. The project technical features include: resurfacing; concrete overlays; unclassified excavation/fill;
47 329
GREGORY HUNKLE, CBO , ICC Certified
coldmill & overlay; removal of existing sidewalk, curb and gutter; driveway approaches, and speed humps; and the construction of sidewalk, curb ramps, cross walks, cross gutters, driveway approaches, and asphalt and concrete improvements of several City streets. The project also includes tree removals and several manhole/utility adjustments. The project cost is approximately $5.1 Million.
San Bernardino County
Transportation Authority (SBCTA): I-10 Cherry Avenue Interchange, Fontana, San Bernardino County Senior Roadway Construction Inspector: This project involved the reconstruction and widening of the interchange by constructing an additional bridge over UPRR tracks. Work included demolishing the existing bridge over I -10 Freeway and replacing it with a new brid ge (2-span CIP-PS Box Girders supported on columns and founded on spread footings). Bridge Widening-PCPS Girders over UPRR Tracks, addition of a new loop on-ramp, constructed several retaining walls (MSE & Type- 1 retaining walls, sound walls), Massive shor ing- stage construction, installed metal beam guardrails, widened Cherry Avenue and rearranged utility company facilities. Mr. Hunkle provided inspection of roadway and bridge construction, including the relocation of utilities and mitigation of various environmentally sensitive areas in and around the project site.
Inspected the installation of the project falsework and shoring systems throughout the project.
County of Riverside: I-215 / Van Buren Interchange Improvement, Moreno Valley, Riverside County, California Senior Civil Construction Inspector: The I- 215/Van Buren Blvd. Interchange Project ($32M) reconfigured the existing interchange with the addition of the new eastbound to northbound entrance ramps, realignment, and widening of Van Buren Boulevard, replacement of the bridge structures over the railroad and freeway, and the addition of a traffic signal at the northbound ramps. The bridge consisted of a 2 -Stage pre-cast/pre-stressed I-girder structure, realignment of the Van Buren Boulevard, construction of a new post-tensioned, cast-in-place box girder overcrossing bridge over the I-215 freeway, new ramps, and auxiliary lanes on the I-215. Five Type 1 retaining walls up to 30 feet high were constructed along Railroad tracks and several ramps. Responsibilities included, inspections of the multiple retaining wall systems, structural drainage system, monitoring of the structural falsework and its release, inspection of the various shoring systems all throughout the project.
Parks & Public
Facilities
SilverRock Park Venue Site, City of La Quinta ($5.4M) – Deputy Inspector: This project is a community park for passive use.
The SilverRock Park Venue Project is located on the southeast corner of SilverRock Way and Avenue 52. The park site sits on approximately 14 acres with approximately eight (8) acres of walking paths, turf, and landscaping. Construction work includes but is not limited to precise grading, landscaping and irrigation, utility construction including a grinder pump, stream and lake construction with floating fountain, furnishing and installation of pump for lake, furnishing and installation of lighting, decomposed granite parking lot construction, concrete ADA parking space construction, concrete and decomposed walkways, construction of a st age, construction of outlet structures, construction of retaining walls, construction of an outdoor theater with seating area.
Veteran Sports Park at Tusti
n Legacy, Tustin, CA – Lead Construction Inspector/Deputy Inspector This project is a $24M major capital improvement project for the City of Tustin. The project is a 31.5-acre sports community park bounded by Lansdowne Road, Valencia Avenue, and Severyns Road. Major improvements include infrastructure improvement, installation of drainage devices, water lines, gas lines, communication lines, interior roadway construction, and ADA compliant facilities such as sidewalks, driveways, curb ramps, parking spaces, and recreational buildings. Mr.
Hunkle provided construction inspection and deputy inspection for this project. Technical Project features also include:
major grading activities, AC & PCC paving, reinforced concrete channels, local street improvements, ADA compliant sidewalks, driveways, and curb ramps, curb & gutter, utility installation including w ater and sewer lines, landscape and irrigation, concrete walkways, lighting installation, water features, and hardscape. Retaining wall, block wall and site fencing.
Yvonne Burke John Ham Park & Community Center, City of Lynwood, CA – Lead Construction Inspector/Deputy Inspector Mr. Hunkle provided construction inspection and deputy inspection for this 36,000 sf park and community center. The project included educational classrooms, multi -purpose rooms, exercise and wellness center, commerci al kitchen. The foundation system was a unique mat foundation. This project was designed for a silver LEED rating and is on track for gold attainment. Project progress is being monitored for compliance with special funding under state proposition 84 requirements. Project technical features include: concrete walkways, curb ramps, landscaping, irrigation, lighting, community center, restrooms, retaining walls, parking lot, curb and gutter, site fencing, mass and precise grading, and utility installation. This project was completed ahead of schedule, within scope, and within budget. Total cost of project was $4.7M.
City of Lynwood: Yvonne Burke John Ham Park & Community Center, Lynwood, CA | Senior Construction Inspector: Mr.
Hunkle provided construction insp ection for this 36,000 -sf park and community center. This project was designed for a silver LEED rating and is on track for gold attainment. Project technical features include concrete walkways, curb ramps, landscaping, irrigation, lighting, community center, restrooms, retaining walls, parking lot, curb and gutter, site fencing, mass and precise grading, and utility installation. Mr. Hunkle provided full time inspection on project site, coordinated materials testing, constructability reviews, maintained co ntract administration, evaluated all contractor claims and reviewed contractor’s CPM schedule and monitored updates on a weekly basis.
48 330
49 331
50 332
51 333
LA County Sanitation District: Secondary Treatment Facility, Whittier Narrows Water Reclamation Plant, Whittier, CA | Senior Construction Inspector. This $9M project constructed a new RAS pump station and pipe gallery and installed process air compresses, fine air diffusion, mechanical piping, pumping equipment, power, and controls. Mr. Alhroob understands and is proficient at various maintenance of plan operations. He provided full construction inspection servi ces, document management, coordinated geotechnical and materials testing with retained laboratory, provided and maintained contract administration, implemented procedures for processing RFIs, and ensured compliance with all project plans and specifications, permitting requirements, agency requirements, and local regulations. Mr. Alhroob conducted preconstruction and field meetings at project site prior to commencing shutdown for tie-in or modification of specific plant systems. Mr. Alhroob reviewed the contractors submitted change orders, responded to contractors’ RFI’s and clarification, and ensured labor compliance.
City of Oceansid
e: Roja Lift Station Improvement Project, Oceanside, CA | Senior Construction Inspector. The project scope of work consists of construction of civil, mechanical, structural, electrical, controls, and instrumentation improvements at the City of Oceanside’s Roja Lift Station. The existing lift station wet well that currently houses submersible pumps and piping is constructed of unlined concrete (pre -cast sections). The lift station structures and mechanical components have reached the end of their useful life and require complete rehabilitation. The existing submers ible pumps will be removed and replaced with new submersible chopper pumps on slide rail systems that will be installed inside of the existing/rehabilitated wet well. The demolition and disposal of existing piping, pumps, valves, chain link fencing, concrete and asphalt pavement is included, per Plan. Additional accessibility improvements will provide Collections staff with a safe and reliable means for ingress and egress, including additional working clearances. The project includes a new concrete valve vault, rehabilitated wet well, replacement of force main yard piping, seismic retrofit of the existing structure, fall - protection safety improvements, such as exterior steel stairwell railings, as well as civil site work, new level control devices, various associated electrical and control system improvements, temporary bypass pumping, and appurtenant lift station improvement features, per Plan. Mr. Albroob provided full construction inspection services, document management, coordinated geotechnical and materials testing with retained laboratory, provided and maintained contract administration, implemented procedures for processing RFIs, and ensured compliance with all project plans and specifications, permitting requirements, agency requirements, and local regulations.
City of Oceanside: San Luis Rey Wastewater Treatment Plant and Aeration Basin Effluent Piping Replacement, Oceanside, CA – Construction Inspector. The project scope of work includes the reconfiguration of system connection piping, including six (6) 24-inch aeration basin effluent piping, as well as seismic retrofit of the existing structure, the installation of new plug valves, fittings, pipe, wall penetrations and installations of gate valves and flow meters or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. Mr. Alhroob coordinated the project start and all meetings included preconstruct ion, field meetings, construction progress meetings, etc., and oversaw all documents pertaining to the project, including change orders, requests for information, as-built drawings, record drawings, contractor submittals, mix designs, etc.
City of Oceanside: San Luis Rey Water Reclamation Facility Digester No. 3 Cleaning and Valve Replacements, Oceanside, CA – Construction Inspector. The scope of work includes construction at the City of Oceanside San Luis Rey Water Reclamation Facility for cleaning and rehabilitating Digester No. 3 and replacing existing valves and sections of pipe and fittings, including:
Cleaning, removal, and disposal of the contents of Digester No. 3, temporary odor control, interior and exterior inspection of coating, seismic retrofit of existing structures, installing plug valves to replace existing valves inside the Control Building for Digester No. 3, reconfiguration and installation of ductile iron pipe and fittings to replace existing PVC pipe and fittings inside the Control Building for Digester No. 3, and installing pipe support for new ductile iron pipe. provided full construction inspection services, document management, coordinated geotechnical and materials testing with retained laboratory, provided and maintained contract administration, implemented procedures for processing RFIs, and ensured compliance with all project plans and specifications, permitting requirements, agency requirements, and local regulations.
Hi-Desert Wat
er District: Wastewater Reclamation Project, Phase I, Yucca Valley, CA | Construction Inspector: This Project is comprised of a wastewater treatment and reclamation facility, a collection system, and private property connections that will help property owners comply with the Stat e’s mandated septic discharge prohibition dates. The system includes over 77 miles of pipeline that will transport wastewater collected from homes to the treatment facility. Existing streets where pipelines are installed will be replaced with new roads. The system will be predominantly gravity fed, reducing energy costs, with three lift stations helping move wastewater uphill where necessary. Mr. Albroob provided full construction inspection services, document management, coordinated geotechnical and materi als testing with retained laboratory, provided and maintained contract administration, implemented procedures for processing RFIs, and ensured compliance with all project plans and specifications, permitting requirements, agency requirements, and local regulations.
52 334
53 335
54 336
RESUME
Portia Gonzalez, PE, QSD/QSP
Drainage Lead
Professional Registrations
• Professional Engineer (Civil): AZ,
CA
• Qualified SWPPP Developer
(QSD)
• Construction General Permit
Qualified SWPPP Practitioner
(QSP)
Education + Training
• M.S., Water Resources,
California State University-Long
Beach, 2010
• B.S. Civil Engineering, California
State Polytechnic University,
Pomona, CA, 1991
Affiliations + Member ships
• ASCE Orange County, Hydrology
and Hydraulics Executive
Committee Member
Portia Gonzalez brings more than 30 years of experience. She has served as project manager for various transportation projects in California, Arizona and Nevada. Her expertise includes project management, drainage design, hydrologic and hydraulic modeling, storm water management, 2D modeling, river modeling, floodplain delineation studies, storm drain master planning, detention basin design, bridge scour, roadway drainage and design, water resource planning, sediment transport and water distribution. She brings working knowledge of software such as AES, WSPG, HEC-HMS, HEC-6, HEC- RAS, Flow-Master, Storm CAD, CulvertMaster, InRoads Storm and ArcGIS.
She has worked with Caltrans (Districts 7, 8, 11 and 12), SBCTA, RCTC, OCTA, SANDAG and LA Metro, among others.
Project Experience
City of Beaumont, Master Drainage Plan (MDP) Line 2 Stage 1, Beaumont, CA The Beaumont Master Drainage Plan (MDP) Line 2 Stage 1 is a new major storm drain trunk line for the City of Beaumont between Chestnut Avenue and First Street. The project is to design a storm drain for the 100-year storm event from a large watershed. The storm drain will have to accommodate several existing and future systems in the Line 2 watershed including a future UPRR grade separation. The project also includes design of a detention basin to attenuate flows prior to discharging to the existing Berkshire channel. The EXP Team is providing the hydrology, hydraulics, geotechnical studies, storm drain design, environmental document, traffic control, utilities, right of way and UPRR and Caltrans coordination. Portia is serving as Project Manager.
City of Chino Philadelphia St. and Monte Vista Avenue MDP System 22, Chino, CA
The City of Chino Master Plan of Drainage (MPD) was developed in 1993 to recommend the most viable and cost-effective storm drain facilities to relieve the existing deficiencies and meet future needs. The project scope includes:
install a storm drain along Monte Vista Avenue and Philadelphia Street, connecting the proposed storm drain to the existing double -reinforced concrete box in the Chi no storm drain, installing new catchbasins to capture surface flow, and also installing lateral connections to the new storm drain.
Portia serves as the Project Manager.
*City of Chino, Hills Storm Drain Master Plan, Chino Hills, CA The City’s Storm Drain Master Plan establishes an approach to creating a prioritized Capital Improvement Projects to mitigate the impacts of stormwater runoff in the City. This document identifies the steps taken to inventory and analyze the existing storm drain system, analyzes capacity 55 337
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
restrictions within the storm drain networks and provides recommendations. Portia was the Project Manager for a team of drainage engineers and GIS specialist that analyzed the existing drainage deficiencies throughout the City and provided a range of drainage concepts for the construction of future facilities required to serve the City at buildout of the General Plan and establishes criteria for selecting and prioritizing projects. AES Software was used to for the hydrology and hydraulic computation. Output data was extracted using a project specific programming. This data was then incorporated into the City’s GIS storm drain data base.
City of Ontario, San Antonio Storm Drain, Ontario and Chino, CA Project Manager. The San Antonio Storm Drain is part of the City’s high priority project that will convey flows from a tributary area of approximately 2,500 acres. The project is approximately 2 miles in length with 3 major storm drain laterals. The proposed system ranges from 60” upstream at Philips St. to a 9’x7.5’ RCB downstream that will discharge to the Sultana-Cypress Channel. Portia is responsible for the delivery of the PS&E including environmental documentation, geotechnical report, hydrology study, hydraulic study, storm drain plans, traffic control plans, utility coordination, and SBCFCD Encroachment Permit.
City of Temecula, Diaz Road Improvements, Temecula, CA, USA The project proposes to improve Diaz Road to a major arterial road between Cherry Street and Rancho California Road. Design elements includes roadway widening and extension, raised median, landscaping, curb and gutter, sidewalk and trail realignment, drainage facilities, and treatment BMPs. Portia is responsible for the drainage analysis to comply with the City’s and Riverside County Flood Control District design criteria, WQMPand PS&E.
City of Temecula, Santa Gertrudis Creek, Phase II, Margarita Under Crossing, Temecula, CA, USA Portia serves as the drainage lead and the project goal is to construct an under crossing for pedestrian/bicycle use at Margarita Road. The 1000’ multi-use trail along Santa Gertrudis Creek crosses Margarita Road atgrade under the existing bridge. The under crossing will provide continuous, safe passage under Margarita Road connecting schools and residential areas
.
City of Hesperia, Peach Avenue Improvement, Hesperia, CA, USA The City of Hesperia proposes to realign Peach Avenue between Centennial Street and Hinton Street on Peach Avenue where it crosses the Antelope Valley Wash. The project consists of realigning and raising the roadway profile over the Antelope Valley Wash with reinforced concrete boxes (RCBs) culvert, with new asphalt concrete pavement.
Portia was responsible for the hydraulic alternative analysis and design of new RCBs. Design include channel realignment, grading and structural details for the RCBs to accommodate the new roadway.
City of Rialto, Street Overlay & Reconstruction Project, Rialto, CA, USA This project is to provide engineering services for the City’s 2020/2021 Street Overlay & Reconstruction Project. The scope of work includes pavement rehabilitation in various degrees, drainage analysis and design, utility identification and coordination, new ADA curb ramps, repair or reconstruction of damaged or deficient PCC curb ramps, curb, gutter, sidewalk, driveways approaches, and cross gutters. Portia is the lead drainage and stormwater engineer that provided the hydrology and hydraulic analysis for multiple locations throughout the City.
SBCTA, I-215 Segment 5 Landscape Project, San Bernardino County, CA Drainage and Stormwater Lead. The project ncludes landscape architecture, environmental, stormwater, traffic, electrical, utilities, and cost estimating through the Project Approval and Environmental Document (PA/ED) phase as well as final Plan, Specifications, and Estimate (PS&E). This 1-mile-long project will provide a palms to pines themed landscape transition along I-215 between Highland Avenue and State Route (SR) 210 in the City of San Bernardino. 56 338
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
The project will require significant coordination with SBCTA and several functional units at Caltrans District 8 including Landscape Architecture, Maintenance, Construction, Traffic, and Water Quality.
SBCTA I-215 Bi-County Landscaping PA/ED and PA&E, San Bernardino County, CA Drainage and Stormwater Lead. The project includes landscape architecture, environmental, stormwater, traffic, electrical, right-of-way, utilities, and cost estimating through the Project Approval and Environmental Document (PA/ED) phase as well as final Plan, Specifications, and Estimate (PS&E). This 5.1 long project will provide a themed landscape transition along the I-215 between the San Bernardino County and Riverside County line and Orange Show Road in the City of San Bernardino. The project has required significant coordination with Caltrans District 8 as well the stakeholder cities of Colton, San Bernardino, and Grand Terrace in order to build consensus and ultimately gain approval of the landscape design and environmental document.
Caltrans 12A1756 SR-1 Project: EA 0P5900 & 0P6800: Traffic Signal Upgrades and Pavement Rehabilitation, Newport Beach, Huntington Beach, Seal Beach, CA, USA
The traffic signal and pavement rehabilitation project is located on State Route (SR) 1 between Newport Beach and Seal Beach. This project would improve 20 intersections between PM 13.0 and PM 33.6 and rehab the pavement between Warner Ave. and County Line. The proposed improvements for this location are to remove and replace the existing traffic signals and equipment due to age and serviceability with current Caltrans standard traffic signals and equipment, upgrade the existing curb ramps to the current American with Disability Act (ADA) standard, relocate/adjust the existing drainage facility due to ADA curb ramp improvements, trim the existing median island, and remove the existing pedestrian push button on the median island. Portia is responsible for the hydrology and hydraulics analysis, drainage report, NPDES compliance, and plan preparation. Tasks include coordinating with roadway and signal designers to ensure drainage needs are implemented. Cost: $ 13.3 M │ Length of time spent on project: 3/2019- Current
I-40 Regrade Median Cross Slope Barstow, CA, USA
The I-40 Regrade Project is to re-grade the existing median cross slope within the clear recovery zone (CRZ) to 10:1 or flatter to reduce the severity and the number of run -off-the road accidents in the median on Interstate 40 from
1.4 miles east of Fort Cady Road (PM R25.0) to Crucero Road (PM R50.0) near Barstow, in San Bernardino County. This project is multi -phased that covers both PA/ED and PS&E phase. Portia is responsible for the drainage analysis and design of over 25 culverts that would be extended to accommodate the proposed fill in the median. Other tasks include Caltrans coordination and stormwater coordination. Cost: $28.5M │ Length of time spent on project: 08/2019 – Current
City of Anaheim, Katella Smart Street - Jean Street to Humor Street, CA, USA Project Manager for a corridor improvement project in the City of Anaheim. Project elements include pavement rehabilitation, new storm drain trunk line, signing and striping, utility relocations, intersection improvements, traffic signal, ADA ramps, and bus turn-outs.
*SANBAG, PA/ED I-10 Express Lane Project, Project Report/Environmental Document, Montclair to Redlands, CA, USA
The I-10 Express Lanes Alternative proposes to construct two express lanes in each direction from the Los Angeles County Line in Montclair to Ford Street in Redlands, a distance of 33-miles, along with additional auxiliary lanes at selected locations. The proposed project will consist of the widening of existing roadbeds and undercrossings, replacements for six overcrossings, the widening of 50 bridges, the realignment of on-/off-ramps, auxiliary lanes, and drainage improvements. The total project length is approximately 35 miles including 2 miles of transitional signage and striping west of the Los Angeles/San Bernardino County Line. Within these limits are three freeway-to-freeway 57 339
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
interchanges (I-15, I-215, and I-210), 30 local interchanges, and more than 50 bridge structures that will be affected by this project. The scope of services to be provided includes the necessary tasks and activities required to complete the PA/ED process, including project management, engineering, HOV and Express Lanes alignment assessment, access/egress planning, traffic forecasts, an HOV report, a PR, Geometric Approval Drawings (GADs), fact sheets, and environmental technical studies.
Drainage Engineer responsible for the PA/ED Phase Drainage Report and Floodplain Report to support the construction of a 26-mile-long HOV lane along I-10. A conceptual drainage plan and hydraulic analysis were prepared to determine onsite and offsite drainage and water quality requirements. As part of this project, I-10 is proposed to be widened at the Santa Ana River crossing. A Preliminary Bridge Hydraulics report was performed to determine whether the proposed pier extensions will impact the river’s 100-year design flows. *Caltrans District 8 PM On-Call, San Bernardino, CA, USA Provided Project Management (PM) services for District 8 mainly in the I-15 Corridor. *I-405 HOV Improvement Project (I-605 to SR-73) Design/Build, CA, USA I-405 Improvement Project proposed to construct two additional lanes in each direction between State Route 73 (SR- 73) and Interstate 605 (I-605). The approximately 16-mile-long project corridor is primarily located in Orange County on I-405 and traverses the cities of Costa Mesa, Fountain Valley, Huntington Beach, Westminster, Garden Grove, Seal Beach, Los Alamitos, Long Beach, and the community of Rossmoor. Portia was Drainage Engineer responsible for preparing the Preliminary Drainage Report, Floodplain Reports, and Water Quality Studies (BMPs). Caltrans, in cooperation with OCTA, proposes to improve the freeway mainline and interchanges on I-405 for approximately 16 miles between Bristol Street and I-605. The Drainage Report identified several onsite and offsite drainage facilities that will be impacted by the project. Preliminary hydraulic evaluation was performed for major river crossings to determine impacts. Several permanent BMPs are proposed along the corridor to mitigate Caltrans water quality requirements.
*Metro Gold Line, Sierra Madre to Azusa, CA, USA
Drainage and Stormwater Manager responsible for 12 miles of the Gold Line extension corridor improvement from Sierra Madre to Azusa. This project crosses the San Gabriel River where an Army Corps of engineers 408 Permit was obtained.
*California High-Speed Train, San Jose to Merced and Merced to Fresno Segment, CA, USA The California High-Speed Rail Authority has proposed to construct, operate, and maintain an electric-powered, steel-wheel-on-steel-rail high-speed train (HST) system to link California cities, the Central Valley, Sacramento, and the Bay Area. The HST system will be approximately 800 miles long and capable of operating at speeds of 220 mph on mostly dedicated, fully grade-separated tracks with state-of-the-art safety, signaling, and automated train control systems. Parsons is providing engineering and planning services for the San Jose to Merced section, which includes developing preliminary engineering, planning, and environmental data; preparing a project-specific Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) document; and providing right-of-way preservation and acquisition services. The EIR/EIS will entail engineering and environmental impact analyses for the HST line and facilities, station development, and connections with other modes of transportation. The EIR/EIS process will include involvement from the public; interested groups; and local, state, and federal agencies with approval or permit responsibilities. Lead drainage engineer for the delivery of the Hydrology and Hydraulics Studies, Stormwater Management Plan and Floodplain Evaluation Report. Tasks include hydraulic evaluation for numerous large river crossings, levees, floodplains, and irrigation canals. Floodplain impacts evaluation. Major drainage features studied include the San Joaquin River, Fresno River and Eastside Bypass. 58 340
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
Drainage and Stormwater Manager for the California High-Speed Rail Authority (Authority) electric-powered high- speed rail (HSR) system in California. Provided design engineering and environmental services related to the new high-speed rail. Lead drainage engineer for the delivery of the Hydrology and Hydraulics Studies, Stormwater Management Plan and Floodplain Evaluation Report. Tasks include hydraulic evaluation for numerous large river crossings, levees, floodplains, and irrigation canals. Floodplain impacts evaluation. Major drainage features studied include the San Joaquin River, Fresno River and Eastside Bypass *sbX Bus Rapid Transit, San Bernardino to Redlands, CA, USA Quality Assurance Manager to provide environmental clearance, plans, technical specifications and complete the project development (PD) phase of approximately 15.7 miles and 23 stations. Duties include review of all deliverables including roadway plans, station plans, architecture plans, drainage plans, utility relocation plans, traffic and signal plans. Enforced and ensured Quality Control and Quality Assurance policy prior to agency submittal. *Exposition Light Rail Transit, Los Angeles, CA, USA
Drainage Project Manager and Quality Assurance Manager for a design-build project that included an 8.6-mile double-track extension to the existing metro system. The construction entailed nine new passenger stations measuring 270 feet in length. Three of the passenger stations are on elevated structures crossing major arterials.
Additionally, a 2,200-foot grade separation under the intersections at Exposition, Flower, and Figueroa streets was constructed to facilitate train operations. The traction power system consists of 750-voltage-direct-current (VDC) power from eight traction power substations, distributed to the trains by a low-profile overhead contact system (OCS). Duties include coordination of contractor change orders and drainage design peer review. *High Desert Corridor, Palmdale to Apple Valley, CA, USA Drainage Manager responsible for the Preliminary Hydrology and Hydraulics Report to support the evaluation of a 63-mile long transportation facility. The project evaluated several alignment alternatives, including a tollway, rail transit, bikeway and green energy facilities. Drainage analyses include hydrology study of the Antelope Valley and Mojave River watersheds within Los Angeles County and San Bernardino County. The project area is located in an alluvial fan with several major rivers and streams that traverse the proposed corridor. Hydraulic analyses include over 100 culvert crossings and numerous infiltration basins to address hydromodification and water quality. *City of Fontana, I-15/Duncan Canyon Road, Fontana, CA, USA The City of Fontana proposes a new interchange to provide an additional access point to I-15. The project includes environmental studies and preliminary engineering for several interchange design alternatives. Portia was Drainage Manager responsible the hydrology and hydraulic studies for on- and off-site areas, Stormwater Data Report, preliminary engineering of a major flood control crossing. *City of Moreno Valley, SR-60/Moreno Beach Drive and SR-60/Nason Street, Moreno Valley, CA, USA The City of Moreno Valley proposes to improve the Moreno Beach Drive and Nason Street interchange. The PS&E project included, realigning ramps, adding auxiliary lanes, new traffic signal, new bridges, retaining walls, sound walls, ramp metering, landscaping, irrigation, local street improvements, drainage improvements and utility relocations. Drainage Engineer responsible for the final design plans, hydrology and hydraulic calculations, specifications, and estimate.
*RCTD, Ramon Road Improvement Project, Thousand Palms, CA, USA Lead Drainage Engineer responsible for the off-site and on-site hydrology and hydraulics analysis to improve Ramon Road.
*RCTD, Avenue 52 Railroad Grade Separation, Coachella, CA, USA 59 341
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
The project was to grade separate the at-grade crossing of Avenue 52 with Highway 111 and UPRR and improve Avenue 52 to an urban arterial highway. Lead drainage engineer responsible for the hydrology and hydraulics analysis and PS&E. The project includes design of inlets, storm drains, bridge deck drains, and detention basins. *Caltrans, I-15/SR-74/Central Avenue Interchange, City of Lake Elsinore, CA, USA Drainage Engineer responsible for the PA/ED Phase Drainage Report and Water Quality Assessment. *RCTD, Avenue 56 Airport Blvd/Railroad Grade Separation, Thermal, CA, USA The project was to grade separate the at-grade crossing of Avenue 56 with Highway 111 and UPRR and improve Avenue 56 to an urban arterial highway. Lead drainage engineer responsible for the hydrology and hydraulics analysis and PS&E. The project includes design of inlets, storm drains, bridge deck drains, and detention basins. *Riverside County Flood Control District, Line K-1, City of Moreno Valley, CA, USA Line K-1 is located along Ironwood Avenue and consists of a pipeline constructed upstream of the SR-60/ Moreno Beach Drive interchange which will divert flow away from the interchange and convey it to the Nason Basin located in the northeast quadrant of the Nason Street interchange. At the upstream end of the pipeline, a diversion structure is proposed, comprising two large catch basins that intercept and convey flow to a 1482’ long 90” RCP transitioning to a 90’ long 7’ x 7’ RCB designated as the K-1 Line by the Riverside County Flood Control and Water Conservation District. Line K-1 will outlet to a natural drainage flow path designated as Line K by the County. At the confluence of Line K and Line K-1, a rip rap pad will be constructed to avoid potential downstream erosion of the natural drainage flow path. The conveyance system designated as Line K ultimately conveys the flow to the downstream Nason Basin for detention of peak storm flows. Line K under Ironwood Avenue consists of a 72” CMP which will be modified as part of this project.
Portia managed the drainage team that delivered the PS&E for this Moreno Line K-1. *City of Perris, D Street, SR74 to 3rd Street, Perris, CA, USA Project Manager for the street calming project of D Street. The project includes lane reduction, street parking, pavement overlay, drainage analysis, signal modification and ADA improvements. *City of Wildomar, Bundy Canyon Road, I-15 to Oak Circle Drive, Wildomar, CA, USA The City of Wildomar proposes to improve the Bundy Canyon Road with an additional lane and curb and gutter.
Drainage Lead responsible for the hydrology and hydraulic analysis that includes large off-site tributary areas and new water quality basins.
*SR55 (I-5 to I-405), CA, USA
*I-10 Improvement Project, CA, USA
*I-10/Jackson Interchange Improvement, CA, USA
*I-405 Sepulveda Pass, CA, USA
*TCA Drainage Task Orders, CA, USA
*Perkinsville/SR 78 Intersection Project, CA, USA
*I-405 Widening (I-605 to SR-55), CA, USA
*Gerald Desmond Bridge, CA, USA
*Centennial Corridor Project, CA, USA
*SR-91/East Street Interchange Project, CA, USA
60 342
Portia Gonzalez, PE, QSD/QSP - continued
Drainage Lead
RESUME
*Work performed at previous firm.
*City of San Juan Capistrano, Del Obispo Road Improvement, San Juan Capistrano, CA, USA *Katella Smart Street, Anaheim, CA, USA
*City of Laguna Beach Master Storm Drain Plan, Laguna Beach, CA, USA *City of Chino Hills Master Storm Drain Plan, Chino Hills, CA, USA *Agua Fria River and Gila Rivers Analysis of Sand and Gravel Operations, USA *Zone A Floodplain Delineation for Lower Centennial Wash, USA *SR101L/Thunderbird Ave Widening Drainage Design, AZ, USA *SR101L/Olive Ave Widening Drainage Design, AZ, USA
*Arizona DOT, Task Order, AZ, USA
*City of Phoenix, Task Order, AZ, USA
61 343
RESUME
Christine Brown, PE
Roadway
Professional Registrations
• Professional Engineer (Civil): CA
92510
Education + Training
• B.S., Civil Engineering, California
State Polytechnic University
Languages Spoken
• English
Christine Brown has more than 7 years of civil engineering experience servicing as deputy project manager, task lead, and project engineer for various public improvement projects throughout California.
Her specialties include geometric design and corridor modeling of trail, roadway, and transit corridors including grading, drainage, and wet utilities; intersection improvements including ADA curb ramps and access paths; Complete Streets projects; Safe Routes to Schools projects; and traffic analysis. She is proficient in AutoCAD/Civil 3D, Microstation, MicroStation/InRoads, InfraWorks, SketchUp, PTV Vissim, and MS Project.
Project Experience
SBCTA, SR-210 /Waterman Interchange Project, San Bernardino, CA Christine is serving as the Assistant Project Manager for the Design Engineering Evaluation Report / Environmental Document, and Plans, Specifications, and Estimate phases of the SR210 / Waterman Interchange Project, and is leading the design team which includes roadway and structural engineering, traffic analysis, drainage, environmental, geotechnical, surveying, and utility coordination. The purpose of the project is to improve traffic operations and local circulation at the SR210 / Waterman Avenue interchange. The eastbound on-ramp will be widened from one lane to two lanes; additionally, the intersection of Waterman Avenue and East 30th Street will be restriped to allow for two left-turn lanes in the northbound direction, while the intersection of Waterman Avenue and the eastbound ramps will be widened to allow for two left-turn lanes in the southbound direction. This project requires approval from Caltrans District 8 Oversight.
County of San Bernardino, Phelan Road Widening Project, San Bernardino, CA Christine is serving as the QA/QC Lead for the Project Approval and Environmental Document phase of the Phelan Road Widening project. The purpose of the project is to widen 12.1 miles of Phelan Road from 2 lanes to 4 lanes with a painted median to accommodate for the increased population and resulting traffic in the region. The project will also re-align Phelan Road at State Route 138 to eliminate the existing skewed intersection which will ultimately be approved through Caltrans District 8 Oversight.
SBCTA, I-215 Bi-County Landscaping PA&ED and PS&E, San Bernardino County, CA
SBCTA is proposing landscape improvements to I-215 in order to provide a cohesive corridor between the counties of San Bernardino and Riverside. The project will require significant coordination with all stakeholders including Caltrans 62 344
Christine Brown, PE, QSD - continued
Roadway
RESUME
*Work performed at previous firm.
District 8, and the cities of Colton, San Bernardino, and Grand Terrace in order to obtain approval of the landscape design and environmental document. As project engineer, Christine is responsible for assisting with the design and plan production, as well as the preparation and approval of the Project Report.
City of Temecula, Santa Gertrudis Creek Phase II, Margarita Under-Crossing, Temecula, CA The City of Temecula is proposing to construct an undercrossing for pedestrian / bicycle use along the Santa Gertrudis Creek trail at Margarita Road. The undercrossing will provide continuous, safe passage under Margarita Road, connecting schools and residential areas. Christine is assisting with the development and ongoing management of the project schedule along with liaising between the various team members and subconsultants. As Roadway / Trail Task Lead, Christine is also responsible for the design of the undercrossing including geometric layout, grading, drainage, bicycle lane improvements, and ADA modifications. Christine will also be developing the construction cost estimate and technical specifications for the project.
City of Chino, Pine Avenue Extension to State Route 71, Chino, CA Christine is serving as Roadway Task Lead for the Pine Avenue Widening Project at the SR71 / Pine Avenue interchange in the cities of Chino and Chino Hills. The project includes widening the northbound and southbound off-ramps to increase the ramp capacities, install a traffic signal at the SR71 northbound off-ramp to Pine Avenue, and restripe the overcrossing between the SR-71 northbound and southbound off ramps in the cities of Chino and Chino Hills.
City of Seal Beach, Seal Beach Boulevard & I-405 Pavement Rehabilitation, Seal Beach, CA The City of Seal Beach is proposing a pavement rehabilitation project at the intersection of Seal Beach Boulevard and I-405 EB Ramps / North Gate Road. The project will include pavement rehabilitation for the entire intersection and extending approximately 440 linear feet to the south. As Assistant Project Manager, Christine is responsible for ensuring the project remains on schedule and both identifying and mitigating any potential delays. Christine is also responsible for coordination efforts with the entire team, including teaming partners, and stakeholders (including Caltrans District 12). Finally, Christine is responsible for ensuring the quality and timing of each deliverable, including the Preliminary Environmental Study (PES) and CE /CE, the geotechnical report, the topographic survey, right-of-way certification, utility research, PS&E documents, and any permits required for construction.
City of Downey, Lakewood Boulevard and Imperial Highway Intersection Improvements, Downey, CA The City of Downey is looking to improve traffic circulation and mobility within the I-605 Freeway corridor by minimizing congestion through added capacity and improved operation of the Lakewood Boulevard and Imperial Highway intersection.
As project engineer, Christine is responsible for the design of the roadway widening and civil improvements including the geometric layout, grading, drainage, ADA curb ramp upgrades, and private property improvements. Christine is also assisting with the development of the technical specifications and cost estimate.
Caltrans District 8, Project Management Support Services, San Bernardino, CA EXP is providing consultation, research, professional and technical services required for Program / Project Management Services on an “as-needed” basis to support Caltrans, Division of Program / Project Management (PPM), District 8. As part of the PPM team, Christine assists with providing services to Caltrans including, but not limited to, integration management; scope management; time management; cost management; quality management; resource management; communication management; risk management; project scheduling; project coordination; PM developments and project resource estimating services.
*SBCTA, West Valley Connector Corridor - Pomona to Fontana, CA The West Valley Connector is a bus rapid transit (BRT) project that proposes limited stops, providing speed and quality improvements to the public transit system within the corridor. Among the numerous benefits, BRT provides premium transit 63 345
Christine Brown, PE, QSD - continued
Roadway
RESUME
*Work performed at previous firm.
with 10-15 minute service, Transit Signal Priority (TSP), dedicated lanes, enhanced stations and integration with other bus routes. The project seeks to improve mobility in the San Bernardino Valley with an enhanced, state-of-the-art BRT system to address the growing traffic congestion and the one million people that will be added to the area by 2030. As part of the design team, Christine assisted with the refinement and evaluation of 14 build alternatives, including development of proposed bus routes and station location as well as identification of key impacts to rights-of-way, structures, utilities, and other existing infrastructure.
*SBCTA, Upland Transit-Oriented Development - Upland, CA SBCTA, in conjunction with SCRRA and the City of Upland, proposed a Transit-Oriented Development (TOD) around the Upland Metrolink Station. The goal was to provide the opportunity to shift trips from automobiles to transit and serve as a catalyst for economic development and community improvements. As part of the transit design team, Christine was responsible for preliminary design of railway, station, and parking lot improvements as well as identifying potential utility impacts and coordinating with the respective utility owners. Christine also evaluated various alternatives for pedestrian access to the new station platforms from both the downtown Upland area and proposed developments. *City of Los Angeles, Soto Street Widening (LABOE), Los Angeles, CA The City of Los Angeles is looking to widen Soto Street from two lanes to four, from Multnomah Street north to Mission Road to relieve traffic congestion and improve safety by implementing a retaining wall to help keep hillside debris off the roadway.
The project will tie into the Soto Street / Mission Road bridge removal and street improvement project to the north, and the Soto Street / Valley Boulevard bridge widening project to the south. It will include a wider sidewalk along with Class IV bicycle lanes and will greatly improve vehicular and bicycle mobility throughout the corridor. Christine served as the Deputy Project Manager and was responsible for managing the design schedule and sub-consultants, along with serving as the main point- of-contact with LA BOE. Christine also served as the Roadway Task Lead / Project Designer and was responsible for the discipline design budget as well as the final design of the roadway widening and civil improvements including the geometric layout, grading, drainage, and intersection improvements. *City of Los Angeles, Century Boulevard, Jordan Downs Redevelopment, Los Angeles, CA The City of Los Angeles proposed the extension of Century Boulevard from Grape Street to Alameda Street for a distance of approximately 2,600 feet as part of the Jordan Downs Redevelopment Project. Century Boulevard was underdeveloped in this area and required preparation of new street improvement plan and profile drawings, sewer plans, water plans, street light plans, traffic signal plans, signing and striping plans, storm drain improvement plans, planting and irrigation plans, dry utility plans, and incorporation of “green” elements and structures. As part of the roadway design team, Christine was responsible for portions of the design of the roadway extension, intersections, ADA curb ramps, drainage, and wet utilities along with direct coordination between the City, LA DWP, and the State Resources Control Water Board. *City of Lancaster, 5th Street East Corridor Improvements - Lancaster, CA The City of Lancaster proposed intersection and roadway improvements of the 5th Street East corridor between Avenue H-8 and Avenue J-4. The improvements included curb bulb-outs, ADA curb ramps, pedestrian refuge islands, Class II bicycle lanes, drainage improvements, traffic signal modifications, and signing and striping plans. As part of the roadway design team, Christine was responsible for the design of intersection improvements including curb bulb-outs, ADA curb ramps, and drainage design.
64 346
RESUME
Anh Case, PE, CCM
Construction Management
Professional Registrations
• Professional Engineer, Civil,
64709, CA
• CMAA CCM #5798
• OSHA 30
Education + Training
• MS, Civil Engineering, University
of California, Irvine, 2003
• BS, Civil Engineering, California
Polytechnic State University, San
Luis Obispo, 1999
Affiliations + Memberships
• CMAA Southern CA
─ Events & Awards Chair 2019-
2021
• WTS Orange County
─ Treasurer 2018-present
─ Mentoring Committee 2016-
present
• ASCE Orange County
- Membership Chair 2000-
2018
Languages Spoken
• English
• Cantonese (Chinese)
Anh Case has 24 years of structural and civil engineering experience in the areas of bridges and commercial buildings. Her experience includes construction management, quality assurance/quality control (QA/QC) inspection, planning, scheduling, structural design, quantity takeoffs, cost estimates, plan preparation, and client correspondence. Anh has held positions ranging from bridge design engineer, construction inspector to structures representative, as well as resident engineer. She has worked on various transportation projects, including the I-405 Improvement Project, Borden Bridge Road Improvements, SR 101/Springville Interchange, SR 178/Fairfax Interchange, Metro Exposition Transit Corridor, SR 22 High Occupancy Vehicle (HOV) Widening Design-Build project and the Ocean Boulevard/Terminal Island Freeway Interchange. Anh has worked with a variety of agencies, including California Department of Transportation (Caltrans), Orange County Transportation Authority (OCTA), Port of Long Beach (POLB), Metrolink, and various city agencies including Los Angeles, Bakersfield, Camarillo, San Marcos and Seal Beach.
Anh is experienced in the design and construction of simple-span and multi- span bridges, retaining walls, mechanically stabilized earth (MSE) walls, and retrofit of existing bridges in accordance with Caltrans and American Association of State Highway and Transportation Officials (AASHTO) codes.
She also has experience with highway construction inspection requiring compliance with Caltrans’ procedures, standard plans, and specifications.
Anh is very familiar with the Caltrans electronic lane closure system (LCS) and is well versed with the Manual of Uniform Traffic Control Devices (MUTCD), California Supplement. She is also knowledgeable in the required frequencies and procedures of materials testing in accordance with the Caltrans Construction Manual and the California Test Method. Anh also understands environmental considerations, including storm water pollution prevention plan compliance.
Software proficiency: MS Office Suite (Excel, Word, PowerPoint, SharePoint, OneNote), Bluebeam, Adobe Acrobat, Procore
65 347
Anh Case, PE, CCM – continued
Construction Management
RESUME
*Work performed at previous firm.
Project Experience
Inland Valley Development Agency (IVDA), Mountain View Avenue Roadway Improvements Project, San Bernardino, CA, $12.2M
Structures Representative. Inland Valley Development Agency (IVDA) is the lead agency for the Mountain View Avenue Roadway Improvements Project. This $12.2M project will replace the two-lane bridge at Mission Creek with four lanes, widen Mountain View from the Mission Creek Bridge to the Santa Ana Bridge, provide new curb, gutter and sidewalk to the west side of Mountain View, construct roadway and traffic signals improvements at Victoria and San Bernardino Avenues, realign the access roads to the SCE Mountain View Generating Station, realign and strengthen the walls of Mission Creek and resurface Mountain View Avenue from the Santa Ana River to Mission Creek. The Project will also provide storm drain, water, gas line, and private improvements along Mountain View Avenue. EXP is providing Construction Inspection and Structures Representative Services.
Anh is responsible for reviewing plans such as Girder Erection Plan, Contractor Schedule for Structures related activities and structures grades for substructure and super structure elements.
Other Role / Scope of Services Provided include:
• Management and administration of construction contract activities. • Providing cost, schedule, and document control services. • Assist in Changes and Claims resolution
• Providing project progress reports and attend meetings. • Structures Inspection Services
• Bridge deck 4-scales and grades
• Monitoring construction contractor safety compliance and labor code compliance. • Monitoring construction contractor maintenance and record drawing obligations. • Coordination with the adjacent Redlands Passenger Rail Project.
Dates on project: July 2020 – August 2021
*Orange County Transportation Authority (OCTA), I-405 Improvement Project, Orange County, CA, USA, $600M Structures Segment Lead. Orange County Transportation Authority (OCTA) in cooperation with The California Department of Transportation (Caltrans) is widening the San Diego Freeway (I-405) between State Route 73 (SR-73) and Interstate 605 (I-605). The project will improve 16 miles of I-405 between the SR-73 freeway in Costa Mesa and I-605 near the L.A. County line. The project includes adding one general purpose lane in each direction between Euclid Street and I-605 and making improvements to freeway entrances, exits and bridges. In addition, the project will add the 405 Express Lanes, incorporating the existing carpool lanes and a new lane in each direction between SR-73 and I-605. The project is within 4 City agencies including Seal Beach, Huntington Beach, Westminster and Costa Mesa and includes improvements to 32 utilities and 22 bridges along the corridor. Improvements to the 22 bridges include widenings, rehabilitation, replacements and stage construction.
Anh was the Segment 3 Structures Lead. She was responsible for the oversight of the Caltrans Quality Verification Structures Team in Segment 3. She also manages inspection staff, reviews a variety of submittals such as shoring, falsework, excavation plans, bridge demo plans and concrete mix designs. Anh also review the Quality Management Plans and various construction work plans.
Dates on project: May 2017 - January 2019
66 348
Anh Case, PE, CCM – continued
Construction Management
RESUME
*Work performed at previous firm.
*City of San Marcos, Borden Bridge Road Construction Management, San Marcos, CA , $5M Resident Engineer/Structures Representative. Anh provided construction management services for the Borden Road Bridge, a gap-closure bridge that spans the San Marcos Creek on Borden Road from Twin Oaks Valley Road to Woodward Street. The project included a two-span precast, prestressed T-bulb girder bridge. The bridge was constructed on two types of cast-in-drilled-hole (CIDH) piles and includes two 12-foot traffic lanes in each direction, a five-foot shoulder/bike lane in each direction, a 10-foot wide equestrian/multi-use trail, and a five-foot sidewalk.
Roadway improvements included bridge approaches, drainage, landscaping, and irrigation improvements.
Anh reviewed and coordinated comments from all reviewers for working drawings such as falsework plans, column guying plans, prestress and precast shop plans, rebar shop plans, and pile drivability study. She ensured that the pile driving activity was monitored continuously and the pile driving records were logged and documented for the CIDH piles. She provided the abutment grades, column grades, camber, soffit grades, and top of deck grades using the bridge deck grades (four-scale). Anh also ensured that embankment surcharge loads were built and monitored per the contract specifications. She was also responsible for addressing requests for information (RFIs) pertaining to the bridge. She led preactivity meetings to address milestone activities such as pile drilling, falsework erection and removal, superstructure concrete pours, and prestressing of the girders. Anh worked closely with the City of San Marcos’ material technicians to ensure accurate testing and material acceptance for items used on the project.
Other responsibilities included coordinating with utility entities (Vallecitos Water District and San Diego Gas and Electric) through the bridge structure. She provided daily reports, weekly structural newsletters, and weekly statements of working days and photos to ensure accurate documentation of the project. She also provided quantity sheets and reviewed and negotiated pay estimates with the contractor monthly. She reviewed and negotiated contract change orders (CCOs) and ensured the contractor’s compliance with plans, specifications, and other contract documents to produce quality structures while maintaining a safe environment. At the completion of the project, Anh provided closeout items such as certification of materials, disposition of records, and as-built information.
Dates on project: October 2011 - November 2013.
*Filippin Engineering & City of Camarillo, Springville Interchange/US 101 Interchange Construction Management, Camarillo, CA , $28M
Assistant Resident Engineer/Structures Representative. The project constructed a new diamond interchange with the Springville Drive overcrossing across US 101. Roadway improvements included four new ramps and bridge approaches, as well as associated drainage, landscaping, and irrigation improvements. The overcrossing was a two- span, cast-in-place, prestressed box girder bridge with abutments and columns on pile cap and cast-in-steel-shell (CISS) piles.
Anh reviewed and coordinated comments from all reviewers for working drawings such as falsework plans, column guying plans, pre-stress shop plans, rebar shop plans, structural sign shop plans and pile drivability study. She ensured that the pile driving activity was monitored continuously and the pile driving records were logged and documented for the CISS piles. She provided the abutment grades, column grades, camber, soffit grades, and top of deck grades using the bridge deck grades (four-scale). Anh also ensured that embankment surcharge loads were built and monitored per the contract specifications. She was also responsible for addressing requests for information (RFIs) pertaining to the bridge. She led preactivity meetings to address milestone activities such as placement of shoring boxes, pile driving, falsework erection and removal, superstructure concrete pours and prestressing of the bridge. Anh worked closely with the Caltrans’ Oversight and Materials Engineering and Testing Services (METS) to ensure accurate testing and material acceptance for items used on the project. Other responsibilities included 67 349
Anh Case, PE, CCM – continued
Construction Management
RESUME
*Work performed at previous firm.
coordinating with four different utility entities (Southern California Edison, Verizon, Time Warner Cable, and City of Camarillo sewer) through the bridge structure. She provided daily reports, weekly structural newsletters, and weekly statements of working days and photos to ensure accurate documentation of the project. Anh also led and coordinated partial and full closures on the SR 101 during the shoring box installation, falsework erection, and removal. She also provided quantity sheets and reviewed and negotiated pay estimates with the contractor on a monthly basis. She reviewed and negotiated contract change orders (CCOs) and ensured the contractor’s compliance with plans, specifications, and other contract documents to produce quality structures while maintaining a safe environment. At the completion of the project, Anh provided closeout items such as certification of materials, disposition of records, as-built information, and a Report of Completion of Structures.
Dates on project: May 2010 – May 2012.
68 350
RESUME
Ryan Luong, PE, QSD/QSP
Drainage
Professional Registrations
• Professional Engineer (Civil): CA
• Qualified SWPPP Developer
(QSD)
• Construction General Permit
Qualified SWPPP Practitioner
(QSP)
Education + Training
• B.S. Civil Engineering, California
State Polytechnic University,
Pomona, CA, 1998
Ryan Luong is a California Licensed Civil Engineer with more than 20 years of professional civil engineering experience in planning, design, supervision, project management, and construction management of roadway, highway, rail transit, airport and waterworks infrastructure projects. He has working knowledge of all phases of the projects from conceptual engineering, preliminary design to detailed engineering design and construction contract preparation; Experience with design-build transportation projects in California, Colorado, Indiana and Oregon. His design experience includes roadway/highway design, grading, drainage, hydrology, hydraulic modelling, utility, street improvements, storm drains, sanitary sewers. He is proficient in computer-aided design and drafting software (Microstation, Power Inroads), hydrology and hydraulics analysis software (HEC-RAS, WSPG, StormCAD).
He has worked with Caltrans (Districts 7, 8, 11 and 12), SBCTA, RCTC, OCTA, SANDAG and LA Metro, among others.
Project Experience.
City of Ontario, San Antonio Storm Drain, Ontario and Chino, CA Senior Project Engineer. The San Antonio Storm Drain is part of the City’s high priority project that will convey flows from a tributary area of approximately 2,500 acres. The project is approximately 2 miles in length with 3 major storm drain laterals. The proposed system ranges from 60” upstream at Philips St. to a 9’x7.5’ RCB downstream that will discharge to the Sultana-Cypress Channel. Ryan is responsible for the delivery of the PS&E including hydrology study, hydraulic study, and storm drain plans.
SBCTA and City of San Bernardino, SR 210 at Waterman Avenue Interchange Project, San Bernardino, CA
Senior Project Engineer. The Project will improve traffic operations and local
circulation at the SR 210/Waterman Avenue intersection with East 30th Street and the eastbound SR 210 entrance ramp. The eastbound on-ramp will be widened to two lanes and will include a retaining wall. The bridge will be striped to provide dual northbound and southbound left-turn lanes at the intersection.
69 351
Ryan Luong, PE, QSD/QSP - continued
Drainage
RESUME
*Work performed at previous firm.
*City of Ontario / Grove Avenue Interchange and Grove Avenue Widening The City of Ontario, in cooperation with the California Department of Transportation (Caltrans), proposed to improve the existing Interstate 10 (I-10) / Grove Avenue Interchange in the City of Ontario, California. The proposed improvements included a new interchange at Grove Avenue and widening of the Grove Avenue corridor from Fourth Street to Airport Drive. Tasks included hydraulic evaluation for major channel crossing, floodplain evaluation, hydrology and hydraulic analyses and preparation of drainage reports. *SANBAG, PA/ED I-10 Express Lane Project, Project Report/Environmental Document, Montclair to Redlands, CA, USA
The I-10 Express Lanes Alternative proposes to construct two express lanes in each direction from the Los Angeles County Line in Montclair to Ford Street in Redlands, 33-miles, along with additional auxiliary lanes at selected locations. The proposed project will consist of the widening of existing roadbeds and undercrossings, replacements for six overcrossings, the widening of 50 bridges, the realignment of on-/off-ramps, auxiliary lanes, and drainage improvements. The total project length is approximately 35 miles including 2 miles of transitional signage and striping west of the Los Angeles/San Bernardino County Line. Within these limits are three freeway-to-freeway interchanges (I-15, I-215, and I-210), 30 local interchanges, and more than 50 bridge structures that will be affected by this project. The scope of services to be provided includes the necessary tasks and activities required to complete the PA/ED process, including project management, engineering, HOV and Express Lanes alignment assessment, access/egress planning, traffic forecasts, an HOV report, a PR, Geometric Approval Drawings (GADs), fact sheets, and environmental technical studies.
*OCTA, I-405 HOV Improvement Project (I-605 to SR-73) Design/Build, CA, USA I-405 Improvement Project proposed to construct two additional lanes in each direction between State Route 73 (SR- 73) and Interstate 605 (I-605). The approximately 16-mile-long project corridor is primarily located in Orange County on I-405 and traverses the cities of Costa Mesa, Fountain Valley, Huntington Beach, Westminster, Garden Grove, Seal Beach, Los Alamitos, Long Beach, and the community of Rossmoor. Ryan was Drainage Engineer responsible for preparing the Preliminary Drainage Report, Floodplain Reports, and Water Quality Studies (BMPs). Caltrans, in cooperation with OCTA, proposes to improve the freeway mainline and interchanges on I-405 for approximately 16 miles between Bristol Street and I-605. The Drainage Report identified several onsite and offsite drainage facilities that will be impacted by the project. Preliminary hydraulic evaluation was performed for major river crossings to determine impacts. Several permanent BMPs are proposed along the corridor to mitigate Caltrans water quality requirements.
*Prado Auxiliary Dike Flood Wall Project
US Army Corps of Engineers proposed 2005 to build Prado Auxiliary Dike Flood Wall in the City of Corona, California for flood protection purposes. Tasks included preparation of project feasibility report. *South Bay Expressway, State Route 125 Toll Road Design-Build Project The South Bay Expressway, a 9.3-mile tolled extension of SR-125 in San Diego County, CA, was developed in 2003 under a long-term public-private (P3) concession by California Transportation Ventures. The project was built in conjunction with the construction of the publicly funded 3.2-mile link to the existing freeway network at the northern end. Tasks included project hydrology and hydraulic calculations, drainage design and preparation of project drainage plans.
70 352
Ryan Luong, PE, QSD/QSP - continued
Drainage
RESUME
*Work performed at previous firm.
*L.A. Metro, Metro Gold Line Foothill LRT Segment 1 Design-Build The project proposed to build 13.7 miles of light rail line and 13 stations in 2000. The project would connect Union Station in Downtown Los Angeles and Pasadena. Tasks included drainage design and at-grade crossing roadway design.
*The Metropolitan Transit Development Board (MTDB), Mission Valley East LRT Extension MTDB proposed to build a 5.9-mile Mission Valley East Light Rail Transit (LRT) extension of its Blue Line in 1999. The project extended the existing system from its current termini east of Interstate 15 to the City of La Mesa, where it would connect to the existing Orange Line near Baltimore Drive. The line served four new stations at Grantville, San Diego State University (SDSU), Alvarado Medical Center and 70th Street, as well as two existing stations at Mission San Diego and Grossmont Center. The proposed project included elevated, at-grade, and tunnel portions and provide two park and ride lots and a new access road between Waring Road and the Grantville Station. Tasks included river hydraulic modeling, drainage design and roadway design. *California Department of Transportation, Palo Comado Canyon Road/US 101 Interchange Final Design, City of Agoura Hills, CA
The interchange was deficient with regard to safety and capacity. The project included bridge widening, street improvements, new on- and off-ramp configuration and modification, landscaping, aesthetics, and street lighting.
Ryan provided final design’s hydrology and hydraulic analyses, drainage design, and a stormwater data report. *Port of Long Beach, POLB Pier E Intermodal Yard Design, Long Beach, California, United States. 7/2015-9/2017.
The new 12-track, on-dock intermodal facility is part of POLB’s Middle Harbor Terminal development project to combine Piers E and F into a 350-acre mega terminal known as Middle Harbor Terminal. The project features included electrified wide-span rail-mounted gantry cranes and provisions for crane and rail yard automation. The scope included final design of concrete beam crane rail foundation, track alignment, grading, drainage, in-ground compressed air, track control, and worker protection systems and support buildings. A simulation modeling of the rail yard operations was performed to evaluate design features.
71 353
RESUME
Mitsuru Tanaka, PE, PTOE, PTP
Traffic Design
Professional Registrations
• Professional Engineer
─ DC #PE922223,
─ VA #0402053361,
─ MD #51273,
─ DE #26195,
─ WV #24605,
─ GA #PE046761,
─ FL #PE91047,
─ IL #062073065,
─ WI #48379-6,
─ OH #88596,
─ OR #66717PE
• Professional Traffic Operations
Engineer (PTOE) #1024
• Professional Transportation
Planner (PTP) #271
Education + Training
• M.S., Civil Engineering,
University of Delaware, 1998
• B.S., Civil Engineering, Hokkaido
University, Japan,
1994Affiliations + Memberships
Select Project Awards
• Project Title, Award Title,
Organization, Year
• i.e. High Road over Long Run
Creek, Honor Award, ACEC-IL,
2009
Mitsuru Tanaka has over 23 years of experience in transportation planning and traffic engineering projects for various state transportation agencies including Caltrans, DDOT, VDOT, MdSHA, MdTA, MTA, DelDOT, PennDOT, NJDOT, GDOT, and FHWA. His areas of expertise include travel demand forecasting, capacity/level of service analysis, traffic safety analysis, traffic impact analysis, traffic signal design, ITS design, signing and pavement marking design, roadway lighting design, and developing Transportation Management Plan (TMP), Maintenance of Traffic (MOT) plans and detour plans. He has been deeply familiar with Highway Capacity Manual (HCM), Manual on Uniform Traffic Control Devices (MUTCD), Highway Safety Manual (HSM), the AASHTO Greenbook, ITE Traffic Engineering Handbook, ITE Trip Generation Manual, ANSI/IESNA RP-8-00, and local and state guidelines for traffic engineering designs and studies. Mitsuru has experience with the following software packages: Synchro/SimTraffic, VISSIM, Highway Capacity Software (HCS), SIDRA, CORSIM, CUBE Voyager, MicroStation, AutoCAD, Visual, and AGI32. Mitsuru has managed more than several small to mid- sized traffic engineering study and design projects for enhancing multi-modal transportation safety and operations in his career.
Project Experience
City of Chino, State Route 71/Pine Avenue Interchange, Chino, CA Senior Traffic Engineer responsible for designing electrical plans at a diamond-shaped freeway interchange. The project included widening the existing off-ramps and traffic signal and electrical system designs at the interchange. There are two traffic signals to be designed and one of them is a new traffic signal for accommodating the expected traffic volume increase due to the roadway extension into the City of Chino. A traffic study including the signal warrant analysis was conducted in advance of developing the electrical plans for justifying the new signal, determining the optimized signal phase and timing, and analyzing the existing and future traffic operations at the interchange. The electrical plans included the modification designs of the existing ramp metering system and highway lighting system as well as the existing and new traffic signal systems at the interchange. In addition, VISSIM traffic simulation models were developed for several scenarios including adjacent two interchanges along SR71 for assessing the traffic impacts to the surrounding area.
72 354
Mitsuru Tanaka, PE, PTOE, PTP - continued
Traffic Design
RESUME
*Work performed at previous firm.
City of Santa Clara, Pedestrian Signal Design and ADA Improvement, Santa Clara, CA Lead Traffic Engineer responsible for the traffic signal modification designs for this ADA Improvement project. The project is for improving sidewalks and roadway geometry ADA ramp access within the City’s right-of-way. The pedestrian push buttons are to be relocated at seven intersections along a major highway corridor in accordance with the California MUTCD due to the new ADA curb ramp improvements. Some intersections also included installing street lighting upgrades for securing enhanced pedestrian safety at night. Two of the signals are located at the intersections with the Santa Clara Valley Transportation Authority Light Rail corridor and coordination with the Light Rail signal system is considered in the signal design as having the pedestrian safety to the top priority.
City of Jurupa Valley, Pacific Avenue Pedestrian and Bicycle Improvements, Jurupa Valley, CA Senior Traffic Engineer. Mitsuru is a senior traffic engineer responsible for developing Signing and Striping Plans in accordance with the City’s guidelines and Caltrans Standard and Specifications. The project is to design street improvement with curb, gutter, sidewalk, driveway approach, drainage and street intersection treatments within its
0.8-mile project limit. The improvement plan is to convert the existing street to two-lane road with the center turn lane as accommodating the bikes on the shared lanes. The Rectangular Rapid-Flashing Beacons (RRFB) were recommended to install at the crosswalk across the existing school. The associated quantities and cost estimates are also prepared for the bidding documents.
City of Chino, Euclid Avenue Restriping Project, Chino, CA Senior Traffic Engineer. Mitsuru is a senior traffic engineer responsible for developing Traffic Control Plans (TCP) including stage construction and traffic handling plans and motorist information plans. The project area is approximately 0.6-mile stretch of a State Highway Route with signalized intersections at both ends. The traffic impact was studied for the lane configuration changes and detoured traffic during the construction phases.
Permanent Signing and Striping Plans were developed as well as the Traffic Control Plans. Associated quantities of signing, striping, and traffic control devices were prepared as well.
Caltrans District 8, Fontana Maintenance Facility, Fontana, CA Senior Traffic Engineer. Mitsuru was a senior traffic engineer responsible for developing Transportation Management Plan (TMP) for the design-build project. The project was for construction of three major buildings for the Caltrans maintenance facility including the roadway improvements in front of the facility. The roadway improvement work was approximately 1,000 feet including installation of curb and gutter, sidewalk, storm drain, and utilities. Traffic Control Plans were developed for the roadway improvements and included in the TMP. The TMP was developed along the Caltrans Transportation Management Plan Guidelines. *Delaware Statewide Traffic Impact Study Review Project, Statewide, DE Project Engineer responsible for reviewing the TIS for completeness and accuracy, re-analyzing all capacity analyses with Highway Capacity Software (HCS) or SYNCHRO, evaluating signal warrant analyses, determining the development’s compliance with local and state comprehensive plans, and writing a review letter recommending approval or rejection of the development and a list of recommended improvements that should be required for the developer. Analysis included approximately 50 single-lane roundabouts using HCS, SIDRA, and the NCHRP Report 03- 65 Methodology. All TIS reviews were to be completed within a quick (18 working-day) turnaround to comply with DelDOT’s review schedule. Over seven years of the contract time period, approximately 230 Traffic Impact Studies (TIS) were assigned under this contract. Mr. Tanaka was assigned to be stationed at DelDOT’s Planning Section for two years.
73 355
Mitsuru Tanaka, PE, PTOE, PTP - continued
Traffic Design
RESUME
*Work performed at previous firm.
*NJ Statewide Traffic Signal Optimization – Southern Region, NJ Route 30 Corridor, Atlantic County, NJ Lead Traffic Engineer responsible for optimizing traffic signal timings, phases, splits, offsets and cycle lengths along the existing major corridor. Clearance intervals were also recalculated and evaluated for the traffic safety purpose. The project area included approximately 4.5-mile arterial stretch with 12 signalized intersections in southern New Jersey. The corridor was modeled in Synchro/SimTraffic software. The existing models were calibrated in SimTraffic based on the field travel times observed by Tru-Traffic software with GPS. Signals were optimized with Synchro and TruTraffic and 5 different timing plans were prepared for different times of the days for implementation.
Traffic Calming Study: Camp Grandview (Pickens County Traffic Engineering IDIQ), Jasper, GA Senior Traffic Engineer responsible for QA/QC the traffic calming study report. This study was for reviewing the applicability of speed tables as a traffic calming measure. The data collection for the study included the vehicle running speed, pedestrian activity, the existing roadway’s geometry, signage, striping and clear zones. Several traffic calming measures were reviewed and considered including various speed tables, raised pedestrian crosswalks, and speed cushions. The study recommended placing the calming measure including raised pedestrian crosswalks the at several key locations for the vehicles to slow down safely as considering their spacings and maintaining the major crosswalk locations in the mid-block of the study area. *Route 7 Corridor Improvement Project, From Jarret Valley to Reston Parkway, Fairfax County, VA Lead traffic engineer responsible for the evaluation of alternative intersection designs for the second phase of the design which includes Displaced Left/Continuous Flow, Green-T, Restricted Crossing Median U-Turn, Median U-turn and roundabout intersections for safely accommodating the vehicles, bikes, and pedestrians all together along the corridor.
VISSIM and Synchro are being used in the evaluation and development of the alternatives. VISSIM software was used to evaluate existing conditions and selected design alternatives for the future conditions. Synchro software was utilized for signal optimization for the signals along the 7-mile corridor and was also used for reinforcing the VISSIM evaluation results. *Hilton Parkway Corridor Safety Study, Baltimore, MD
Project Manager responsible for evaluating the existing safety traffic conditions along Hilton Parkway located in West Baltimore. Approximately 1.1-mile length of the winding parkway was studied with field observation and traffic accident analysis from past five years. The studied parkway segment had two lanes on each direction and a barriered median between the opposite directions. Guide rails has been installed at some length of the studied segment and the street lighting has been installed throughout the study segment. Through the safety study, it was found that there were relatively high number of accidents on wet-surface conditions and at the night. The final recommendation included drainage improvement for the areas with underground water leaks, installing Raised Pavement Markers (PRM), streetlight improvements, and frequent restriping for improving the traffic safety along the corridor. *US13 Business and Naylor Street Intersection Study, Salisbury, MD Project Manager responsible for safety and traffic efficiency improvement at the intersection of US13 Business and Naylor Street. The study was for MDOT SHA District 1 and it included observing traffic counts, signal operations, traffic control device conditions, street lighting conditions, sidewalks and ADA compliance devices at and around the intersection. Crash analysis was also conducted for assessing the intersection safety with the traffic accident data for the past three years at the intersection. Crosswalks replacement, signal interval change, pedestrian signal head installation, audible ADA compliance push button installation, ADA ramp installation, sidewalk repairs, and installing additional warning signs were recommended at the end of the report with the estimated construction cost for each improvement.
74 356
RESUME
Gabriel Rodriguez, PE
Roadway
Professional Registrations
• Professional Engineer (Civil): CA
Education + Training
• B.S., Civil Engineering, California
Polytechnic State University at
Pomona, 2001
Software Proficiency
• MS Office (Word, Excel)
• MS Project
• Bluebeam.
Gabriel Rodriguez has more than 24 years of civil engineering experience in the design and management of transportation and public infrastructure projects. His project experience includes street improvements, state system improvements, storm drain facilities, sanitary sewer and water distribution infrastructure, storm water management and analysis, and dry utility coordination. He has executed projects from preliminary engineering and alternative analysis through final design and construction management.
Gabriel brings experience with a number of agencies, including LA Metro, Orange County Public Works, SBCTA, Riverside County Transportation Department, Riverside Transit Agency, as well as local agencies such as the Cities of Palmdale, Irvine, Fontana and Colton.
Project Experience
*City of Hesperia, Ranchero Road Corridor Improvements, Hesperia, CA Gabriel served as project manager for the Ranchero Road Corridor Improvement project for the City of Hesperia. The proposed improvements will provide capacity for future growth on the east side of the city as well improved access to a new interchange at Interstate 15. The project includes the design of approximately 5 miles of road improvements, two major multi-barrel culvert crossing extensions as well as the approval of a Construction and Maintenance agreement for an at-grade UPRR crossing. Gabriel led the design team that is working with the City of Hesperia, County of San Bernardino, the local water purveyor, and UPRR to facilitate approval of the final plans, specifications and estimate (PS&E). *City of Coachella, Avenue 52 and Grapefruit Grade Separation, Coachella, CA Gabriel served as project manager for the Avenue 52 and Grapefruit Boulevard Grade Separation project in the city of Coachella. The project will grade separate Avenue 52 and the Union Pacific Rail Road (UPRR) line which will provide better access between the west and east sides of the city, as well as more efficient mobility for emergency vehicles. Funding for this project included $10M of TCIF funding which was required to be allocated by the end of 2013. Gabriel led the coordination effort with Caltrans Local Assistance and Riverside County Transportation Commission (RCTC) to gain California Transportation Commission (CTC) and E-76 approval. Mr. Rodriguez also led the design team, which finalized the plans, specifications and estimate and secured agreements with UPRR, Coachella Valley Water District, Imperial Irrigation District, and Verizon/MCI. *Caltrans District 7 Engineering On-Call, Los Angeles, CA Gabriel served as project manager for the Engineering On-Call Contract for Caltrans District 7. A significant portion of the on-call effort was dedicated to the 75 357
Gabriel Rodriguez, PE - continued
Roadway
RESUME
*Work performed at previous firm.
High Desert Corridor of which Gabriel managed an engineering team that provided preliminary high speed rail and grade separation design as a component of the proposed highway corridor between the cities of Victorville and Palmdale. The design effort which included rail, roadway, drainage, and traffic was in support of Caltrans who was the lead for the highway design for the Project Approval and Environmental Document phase. The rail component of the High Desert Corridor termination point in the City of Palmdale is proposed to share the future California High Speed Rail station, which required close coordination with the California High Speed Rail Authority and the City of Palmdale. *City of Palmdale, Rancho Vista Grade Separation, Palmdale, CA Gabriel served as project manager in the early stage of the Rancho Vista Grade Separation project and was responsible for leading the project design team which included roadway, structures, traffic, survey, and geotechnical. The project, located in the city of Palmdale, will provide an overhead grade separation structure on Rancho Vista Boulevard, which will span Sierra Highway as well as existing and future UPRR, Metro, and California High Speed Rail mainline tracks. The project proposes to construct a new eight-lane grade separation structure to improve safety and traffic movement at the rail road crossing as well as 4.5 miles of local roadway improvements to provide connectivity and access to existing parcels adjacent to the project. *City of Irvine, Jamboree Road Widening, Irvine, CA
Gabriel served as project manager for the Jamboree Road Widening project and was responsible for leading the project design team which included roadway, traffic, utility coordination, landscape, survey, environmental, and geotechnical. The project, located in the city of Irvine, proposed to expand Jamboree Road from an 8-lane arterial to a 10-lane arterial for approximately
1.5 miles between Barranca Parkway and the north side of I-405. The design and environmental effort included preliminary engineering, alternative analysis, environmental report, project study, and final plans, specifications and estimates.
Phelan Road Widening Project, for County of San Bernardino, San Bernardino County, CA Gabriel is serving as the project manager for the Phelan Road Widening project and is leading the design team which includes roadway and structural engineering, drainage, environmental, geotechnical, surveying, utility coordination and public outreach.
The purpose of the project is to widen 12.1 miles of Phelan Road to accommodate for the increased population and resulting traffic in the region. The project design will include geometrics and vertical profiles for the widening from two lanes to five lanes, hydrology and hydraulic analysis of 26 culvert crossings, bridge improvements at Sheep Creek, traffic and traffic signal design, utility relocations, and environmental planning and permitting. The project will also require coordination with stakeholders including Caltrans District 8, Union Pacific Railroad, the California Public Utilities Commission, regulatory permitting agencies, and the City of Hesperia.
Lakewood Boulevard and Imperial Highway Intersection Improvement Project, for City of Downey, Downey, CA Gabriel is serving as project manager for the Lakewood Boulevard and Imperial Highway Intersection Improvement project and is responsible for leading the project design team to develop the roadway and storm drain improvement plans. The project located in the City of Downey, proposes to add dual left turn pockets in both directions on Imperial Highway to improve the traffic level of service of the intersection. The project design includes the roadway geometry and vertical profile for the widening of Imperial Highway, PCC improvements, storm drain lateral design, water appurtenance relocations, and private property improvements. The project will also require approval by Los Angeles County for the relocation of the County owned catch basin at the southwest corner of the intersection.
76 358
77 359
78 360
79 361
RESUMES
David Evans and Associates, Inc.
improvements to the public transit system within the corridor. The project seeks to improve mobility in the San Bernardino Valley with an enhanced, state-of-the-art BRT system to address the growing traffic congestion and the one million people that will be added to the area by 2030. Working as a subconsultant, DEA provided topographic mapping and surveying and land surveying services in support of the widenings and improvements along the corridor using DEA’s mobile mapping system. Jerry served as project surveyor on this project.
Subsurface Utility Locating and Mapping, San Bernardino County Transportation Authority, Redlands, California
DEA provided above and below ground utility locating and mapping services.
In collaboration with SBCTA for its Redlands Passenger Rail Project, AECOM was tasked with providing construction management services during the early utility relocation phase of the construction project. Having experienced many challenges with unknown underground utilities on past projects, DEA was requested to provide underground utility mapping. DEA surveyors also established survey control, above-ground supplemental surveys and final deliverables including final utility reports with mapping and exhibits of as- built utilities and found existing subsurface utilities. Jerry served as a project surveyor on this project.
80 362
81 363
82 364
83 365
84 366
X
85 367
NONE
86 368
87 369
88 370
89 371
EXHIBIT C
FEE SCHEDULE
90 372
Z&K Consultants, Inc | 17130 Van Buren Blvd, Suite 122, Riverside, CA 92504 | www.zandkconsultants.com April 6, 2023
Stephanie Urueta
City of Costa Mesa, Public Works Department
77 Fair Drive, 1st Floor, Costa Mesa, CA 92626
Subject: Request for Proposal (RFP No. 23-13) for On-Call Public Works/Engineering Staff Support Services
Dear Ms. Urueta,
Z&K Consultants based our proposal on the scope of work provided in the Request for Proposals. All prevailing wage requirements will be followed by the team and its subconsultants. All team members are in conformance with the State of California Labor compliance requirements. Below is a table with the hourly rate schedule. This offer shall remain firm for 90 days from the RFP close date. The payment terms shall be net thirty (30) days.
A – Z&K Consultants, Inc Hourly Rates:
- Senior Construction Manager/Project Manager ...................................................................................... $157 - Senior Project/Program Manager ............................................................................................................ $148 - Construction Manager .............................................................................................................................. $152 - Senior Construction Inspector .................................................................................................................. $135 - Construction Inspector ............................................................................................................................. $131 - Senior Highway & Bridge Designer/Structural Engineer .......................................................................... $155 - Electrical/I&C Inspector ............................................................................................................................ $140 - SWPPP/Environmental Specialist ............................................................................................................. $130 - Senior Traffic/Signal Engineer .................................................................................................................. $136 - Public Relations/Community Outreach .................................................................................................... $135 - AutoCAD/Microstation Technician ........................................................................................................... $110 - Civil/Land Development Designer ............................................................................................................ $130 - Senior Land Surveyor ................................................................................................................................ $135 - Senior Landscape Architect ...................................................................................................................... $144 - Labor Compliance/Office Engineer .......................................................................................................... $128
Hourly Rates are fully burdened, including all overhead and profit. All subconsultants will be bound to the final terms and conditions of the prime agreement. All subconsultant services are subject to a 10% markup.
ALL INSURANCE WILL BE IN FORCE AT TIME OF CONTRACT EXECUTION ALL RATES WILL ESCALATE BY 3% PER ANNUM
Sincerely,
Crystal Fraire, PE |President
Z&K Consultants Inc.
17130 Van Buren Blvd. | Suite 122 | Riverside, CA 92504 951.310.7470 | [email protected]
91 373
CITY OF COSTA MESA
ENGINEERING ON-CALL
MARCH 30, 2023
LABOR CLASSIFICATIONS FULLY LOADED HOURLY RATE
Project Manager 359.02$
Sr. Principal Engineer 317.34$
Sr. Project Engineer III 219.81$
Sr. Principal Engineer II 196.26$
Sr. Principal Engineer I 171.73$
Project Engineer III 147.19$
Project Engineer II 130.02$
Project Engineer I 123.64$
Design Engineer II 117.93$
Design Engineer I 111.36$
QC/QC Manager 317.34$
EXP HOURLY RATES
92 374
Converse Consultants MTS2023
CONVERSE CONSULTANTS
Schedule of Fees – Materials Laboratory Testing
Compensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. Our services will be performed in accordance with the General Conditions. This fee schedule is valid through December 31, 2023.
AGGREGATES
Moisture Content, ASTM D2216 .............................................. 20.00 Particle Size Analysis
Coarse, ASTM C136, each ............................................... 100.00 Coarse and Fine, ASTM C136 & C137), each .................. 180.00 Specific Gravity & Absorption
Coarse Aggregate, ASTM C127 ....................................... 100.00 Fine Aggregate, ASTM C128 ........................................... 100.00 Unit Weight per Cubic Foot, ASTM C29 ............................. 75.00 Soundness, Sodium or Magnesium, ASTM C88, each ..... 200.00 Potential Alkali Reactivity, ASTM D289 ............................ 300.00 Freeze Thaw Soundness .................................................. 175.00 Los Angeles Abrasion, per class, ASTM C131, C535 ....... 220.00 Sand Equivalent, ASTM D2419 ........................................ 110.00 Lightweight Particles, ASTM C123, each .......................... 100.00 Clay Lumps & Friable Particles, ASTM C142, each .......... 120.00 Stripping Test, ASTM D1664, each .................................... 85.00 Organic Impurities, ASTM C40 ......................................... 100.00 Durability ...................................................................... By Quote
CONCRETE TESTS
Laboratory Trial Batch, ASTM C192 .................................. By Quote Laboratory Mix Design, Historical Data .............................. By Quote Compression Test, 6”x12” Cylinder, ASTM C39, each ............. 45.00 Lightweight Concrete
Compression ...................................................................... 45 .00 Unit Weight ......................................................................... 45 .00 Specimen Preparation, Trimming or Coring, each ................... 60.00 Bond Strength, ASTM C321
Prepared by Converse...................................................... 150.00 Prepared by Others ............................................................ 80.00 Core Compression Test, ASTM C12, each .............................. 80.00 Flexure Test, 6”x6” Beams, ASTM C78, each ........................ 110.00 Modulus of Elasticity, Static, ASTM C469, each .................... 150.00 Length Change, ASTM C157, 3 bars, 5 readings each,
up to 26 days .................................................................... 320.00 Splitting Tensile, 6”x12” Cylinders, each .................................. 80.00 Field Concrete Control (sampling, slump, temperature,
cast 4 cylinders, molds, cylinder pick-up, within 10 miles of office, stand-by extra), ASTM/UBC, hourly rate
schedule, or each cylinder .................................................. 95.00 Field Concrete Control (same as above plus air content test), ASTM/UBC, each cylinder .................................................. 95.00 Hold Cylinder ........................................................................... 10.00 Cylinder Mold, sent to job site but not cast by Converse or returned to Converse ............................................................ 5.00
MASONRY (ASTM C140, E447, UBC STANDARD 24-22)
Moisture Content, as received, each ........................................ 20.00 A
bsorption, each ...................................................................... 50.00 Compression, each .................................................................. 55.00 Shrinkage, ASTM C426, each ............................................... 100.00 Net Area and Volume, each ..................................................... 25.00 Masonry Blocks, per set of 9 .................................................. 450.00 Masonry Core Compression, each........................................... 55.00 Masonry Core Shear, each ...................................................... 55.00 Masonry Core Trimming, each ................................................. 55.00 Compression Test, grouted prisms, 8”x8”x16”, each .............. 120.00 Compression Test, grouted prisms, 12”x16”x16”, each .......... 130.00 Compression Test
2”x4” Mortar Cylinder, each ................................................ 45.00 3”x6” Grout Prisms, each .................................................... 45.00 2” Cubes, ASTM C109, each .............................................. 45.00 Cast by Others ......................................................................... 45 .00 Mortar or Grout Mix Designs .............................................. By Quote
FIREPROOFING TESTS
Oven Dry Density, per sample ................................................. 70.00
MOISTURE EMISSION TEST
Moisture Emission Test Kit ......................................................8 0.00
ASPHALTIC CONCRETE
Stability, Flow, and Unit Weight, ASTM D6927 .....................220.00 Marshall ASTM D1559, ASTM D2726 ...................................220.00 Measured Maximum Specific Gravity of Mix, ASTM D2041,
Rice Method, each ............................................................95.00 Void Analysis of Cores or Marshall Specimens,
Calculations Only, ASTM D3203, set of 2 or 3 ...................60.00 Laboratory Mixing of Asphalt & Concrete, per sample .............75.00 Complete Asphalt Concrete Mix Design
Hveem or Marshall ...................................................... By Quote Extraction of Asphalt and Gradation, ASTM D2172, Method B, or California 310, including ash correction, each .............220.00 Extraction of Rubberized Asphalt & Gradation, each .............250.00 Specific Gravity, ASTM D2726 or ASTM D1188
Uncoated ...........................................................................95.00 Coated .............................................................................105.00 Immersion-Compression .......................................................400.00 Particle Coating, ASTM D2489 ...............................................60 .00 Stripping, ASTM D1664 ..........................................................70.00 Moisture or Volatile Distillates in Paving Mixtures, or Materials Containing Petroleum Products or
By-Products .....................................................................220.00 Retained Strength, ASTM D1074/D1075, 6 specimens ..... By Quote Retained Stability, Mil, Std, 520A, Method 104,
6 specimens ................................................................ By Quote CBR, ASTM D1883, including M/D Curve, 1 point ................350.00 Asphalt Temperature ...............................................................15.00
STRUCTURAL STEEL
Tensile Test #9 Bar or Smaller, each ......................................6 0.00 Bend Test #9 Bar or Smaller, each .........................................6 0.00 Tensile Test #10 Bar or Greater, each ..................................280.00 Tensile Test #14 Bar, each ...................................................310.00 Rebar Coupler Tensile Test ..................................................100.00 Tensile Test, Welded #9 Bar or Smaller, each ......................100.00 Tensile Test, Welded #10 Bar or Greater, each ....................280.00 Tensile Test, Welded #14 Bar, each .....................................310.00 Tensile Test, Mechanically Spliced, #9 Bar or Smaller,
each ................................................................................180.00 Tensile Test, Mechanically Spliced, #10 Bar or Greater, each ................................................................................350.00
HIGH STRENGTH BOLT, NUT, AND WASHER TESTING
Wedge Tensile Test, A490 Bolts
Under 100,000 lbs., each ..................................................6 5.00 Over 100,000 lbs., each ....................................................7 5.00 Wedge Tensile Test, A325 Bolts
Under 100,000 lbs., each ..................................................80 .00 Tensile Test, Anchor Bolts, tested with displacement
transducers, each ............................................................300.00 Nut Hardness, Proof & Cone Proof Load Test, each ...............50.00 Washer Hardness, each ..........................................................50 .00 A325 or A490, Bolt Hardness Only, each ................................50.00 Bolt A325 or A490 Wedge Tensile
Under 10
0,000 lbs. & Hardness, each ...............................90.00 Over 100,000 lbs. & Hardness, each ...............................150.00 Bolt, Nut & Washer, all tests per set with bolts
Under 100,000 lbs. ..........................................................300.00 Over 100,000 lbs. ............................................................380.00
See Schedule of Fees – Geotechnical Laboratory Testing for soil testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon the assumption that samples will be delivered to our laboratory at no cost to Converse.
93 375
Converse Consultants GLT2023
CONVERSE CONSULTANTS
Schedule of Fees – Geotechnical Laboratory Testing
Compensation for laboratory testing services will be made in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. The rates are based on non- contaminated soil. A surcharge will be charged for handling contaminated material, which will be determined based on the project.
IDENTIFICATION AND INDEX PROPERTIES TESTS
Visual Classification, ASTM D2488 ................................... 20.00 Engineering Classification, ASTM D2487 ......................... 25.00 Moisture Content and Dry (bulk) Density,
ASTM D2216 and D2937 ............................................. 25.00 Moisture Content, ASTM D2216 .................................. 20.00 Shrinkage Limit, ASTM D4943 .......................................... 85.00 Atterberg Limits, ASTM D4318
Several points ............................................................ 150.00 One Point ..................................................................... 50.00 Particle Size Analysis, ASTM D6913
Fine Sieve, from +#200 to #4 ..................................... 100.00 Coarse and Fine Sieve, from #200 to 3 in .................. 180.00 Hydrometer ................................................................ 120.00 Percent Passing #200 Sieve, ASTM D1140 ...................... 80.00 Specific Gravity
Fine, passing #4 sieve, ASTM D854 .......................... 100.00 Coarse, retained on #4 sieve, ASTM C127 ................ 100.00 Sand Equivalent Test, ASTM D2419 ............................... 120.00 Double Hydrometer Dispersion, ASTM D4221 ................ 150.00
COMPACTION AND BEARING STRENGTH
Standard Proctor Compaction, ASTM D698 or ASTM D1557
Method A or B ............................................................ 200.00 Method C, 6” mold ...................................................... 210.00 California Impact Method, Caltrans 216 .......................... 220.00 R-value, ASTM D2844 and CTM301 ............................... 270.00 California Bearing Ratio (CBR), ASTM D1883
1 Point ........................................................................ 530.00 3 Points ...................................................................... 750.00 Relative Density
0.1 Cubic Foot Mold ................................................... 200.00
0.5 Cubic Foot Mold ................................................... 300.00
SHEAR STRENGTH
Torvane/Pocket Penetrometer .......................................... 25.00 Direct Shear
Quick Test .................................................................... 75.00 Consolidated, Drained, granular soil,
ASTM D3080 ........................................................ 220.00 Consolidated, Drained, fine grained soil,
ASTM D3080 ........................................................ 260.00 Consolidated, Undrained, fine grained soil ................. 220.00 Residual Strength, per cycle ........................................ 70.00 Remolded Specimens .................................................. 70.00
ST
ATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS
(PER POINT)
Unconfined Compression, ASTM D2166 ........................ 150.00 Unconsolidated, Undrained, ASTM D2850 ..................... 160.00 Consolidated, Undrained, per point ................................ 700.00 Consolidated, Drained, per point .................................... 700.00 With Pore Pressure Measurement, per load ................... 150.00 Remolded Specimen ......................................................... 90.00
CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE
(ASTM D4546) TESTS
8 Load Increments .......................................................... 250.00 Additional Load Increment ................................................ 50.00 Time-Ratio, per load increment ......................................... 90.00 Single Point, collapse test ................................................. 90.00
Single Load Swell, ASTM D4546
Ring Sample, Field Moisture ......................................... 95.00 Ring Sample, Air Dried ................................................. 95.00 Remolded Sample .............................................................. 70.00 Expansion Index Test, UBC 29-2/ASTM D4829 ................130.00
HYDRAULIC CONDUCTIVITY TESTS
Constant Head, ASTM D2434 ...........................................250.00 Falling Head Flexible Wall, ASTM D5084 .........................300.00 Triaxial Permeability, EPA 9100 ........................................350.00 Remolded Specimen .......................................................... 60.00
CHEMICAL TESTS
Corrosivity (pH, resistivity, sulfates, chlorides) ..................220.00 Organic Content, ASTM D2974 .........................................100.00
Conditions: Unit rates presented on this fee schedule are for routinely performed geotechnical laboratory tests. Numerous other earth material physical tests can be performe d in our geotechnical laboratories, including rock core, soil cement and soil lime mixture tests. Tests not listed can be quoted upon request. This fee schedule is valid through December 31, 2023.
Prices are based on the assumption that samples are uncontaminated and do not contain heavy metals, acids, carcinogens and/or volatile organics which can be measured by an organic vapor analyzer or photoionization detector with a concentration greater than 50 parts -per-million (ppm). Quoted testing fees are based on the assumption that no protective clothing will be required to handle samples. If Level D protective clothing will be required during handling of samples (as defined in Federal CFR Part 1910.120), then a 40% increase in fees presented in this schedule will be applied. Level C protective clothing will be a 60% increase in fees. Converse will not handle samples that require either Level B or Level A protection in our geotechnical laboratories.
Contaminated samples will be returned to the client. Uncontaminated samples will be disposed of 30 days after presentation of test results. The client must disclose the source of samples. Samples imported from out of state will be incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance with the requirement of the State of California, Department of Food and Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration fee will be added to each sample that is required to be incinerated in accordance with State and Federal law.
Test results requiring plots will be presented in a publishable format generated from computer programs. Otherwise, raw test numbers will be presented. A minimum laboratory fee of $50.00 will be charged to present and mail test results. Beyond the standard U.S. Mail delivery, specialized transmittal will be charged at additional cost (e.g. , Federal Express, UPS, etc.). Geotechnical testing does not include engineering and/or geologic review and analysis.
Typical turnaround for geotechnical laboratory testing is two weeks (or roughly ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geotechnical tests require at least one week to perform in accordance with ASTM or other standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based on the assumption that 2.416-inch inside diameter brass ring samples will be provided to the geotechnical laboratory for testing. Remolded specimens will be compacted in standard 2.5 -inch ou tside diameter brass rings for direct shear, consolidation and expansion pressure tests. All fees presented in this schedule are based on the assumption that the client will deliver samples to our laboratory at no additional cost to Converse.
Invoices will be issued monthly and are payable on receipt unless otherwise agreed upon. Interest of 1.5% per month (but not exceeding the maximum allowed by law) will be payable on any amount not paid within thirty days; payment thereafter to be applied first to ac crued interest and then to the principle unpaid amount. The Client shall pay any attorneys' fees or other costs incurred in collecting any delinquent amounts.
94 376
Converse Consultants PW2023 Geotech
CONVERSE CONSULTANTS
Prevailing Wage Schedule of Fees
Geotechnical Personnel
Introduction
It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source of professional advice and opinions. Services will be performed in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. This fee schedule i s valid through December 31, 2023.
Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care.
Field Technical Services (hourly rate including vehicle and equipment) Construction Inspector – ACI/ICC and/or AWS/CWI certified (concrete, post-tension, masonry, structural steel, fireproofing; includes concrete batch plant and local steel fabrication inspections) ............................... $140 DSA Masonry Inspector ........................................................................................................................................................... 1 40 Non-Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant, skidmore, pull testing, torque testing, Schmidt hammer, and pachometer) .......................................................................................................... 145 Coring Technician .................................................................................................................................................................... 1 40 Soils Technician (soil, base, asphalt concrete, and moisture emission testing) ....................................................................... 140 Sample Pick-Up ......................................................................................................................................................................... 50
Professional Services (consultation for field and office, if requested) Staff Professional ................................................................................................................................................................... $140 Senior Staff Professional .......................................................................................................................................................... 150 Project Professional ................................................................................................................................................................. 160 Project Manager ....................................................................................................................................................................... 170 Senior Professional .................................................................................................................................................................. 1 70 Principal Professional ............................................................................................................................................................... 225 Principal Consultant ................................................................................................................................................................. 235
Laboratory Testing
Laboratory Technician ...................................................................................................................................................... Per Test (see Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor .............................................................................................................................................................. $ 90
Office Support
Clerical/Word Processing ......................................................................................................................................................... $85 Drafting ....................................................................................................................................................................................... 85 CAD Operator/Drafting Manager ................................................................................................................................................ 90
Overtime and special shift rates for Field Services personnel are determined in accordance with Prevailing Wage law. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel.
Expenses
1. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent.
2. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or living 50 miles away from the project site are charged at cost plus fifteen percent.
3. Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS milage rate per mile for company-owned vehicles traveling between principal office and project.
4. Other out-of-pocket
direct project expenses (aerial photos, long-distance telephone calls, permits, bonds, outside printing services, tests, etc.) are charged at cost plus fifteen percent.
Invoices
1. Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.
2. Payment is due upon presentation of invoice and is past-due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may immediately cease work hereunder until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed by law) from the due date, has been received.
Further, Converse may at its sole option and discretion refuse to perform any further work irrespective of payment from Client in the event Client fails to pay Converse for services when said payments are due.
3. Client shall pay attorneys’ fees or other costs incurred in collecting any delinquent amount.
General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.
95 377
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 23-1270 Meeting Date: 6/20/2023
TITLE:
AUTHORIZE THE PURCHASE OF FORD FLEET VEHICLES
DEPARTMENT: PUBLIC WORKS DEPARTMENT, MAINTENANCE SERVICES
DIVISION
PRESENTED BY: RAJA SETHURAMAN, PUBLIC WORKS DIRECTOR
CONTACT INFORMATION: ROBERT RYAN, MAINTENANCE SERVICES MANAGER, (714) 327-7499
RECOMMENDATION:
Staff recommends the City Council:
1. Authorize by minute action, that compliance with the bidding requirements and procedures is inefficient and not in the best interest of the City, based on identified conditions and supported by substantial evidence.
2. Authorize the purchase of Ford fleet vehicles from local authorized Ford dealerships.
3. Authorize the City Manager or designee to execute the necessary documents for the purchase of new and replacement Ford fleet vehicles as approved in Fiscal Years 2021-22, 2022-23, and 2023-24 annual budgets.
BACKGROUND:
Consistent with past practices, new and/or replacement vehicle and equipment requests are evaluated during the annual budget process along with Equipment Maintenance staff recommendations.
The vehicles and equipment identified have high mileage and usage, are in poor condition, and have severe mechanical issues. Other factors for replacement consideration include obsolete parts availability and high maintenance and repair costs. All the vehicles and equipment approved for replacement have exceeded their anticipated service lives.
Typically, vehicles and equipment are purchased using contracts through Sourcewell. Utilizing a Sourcewell contract meets all requirements outlined in the City of Costa Mesa’sPurchasing Policy and all requirements set forth by the State of California in regard to regional cooperative purchasing agreements. This process has been utilized successfully by the City for several previous vehicle purchases. However, over the last two (2) years, the availability of vehicles has been severely limited and manufacturers have not been allocating sufficient inventory for government procurement.
Therefore, a total of twenty-two (22) vehicles that were approved by City Council for replacement in
378
File #: 23-1270 Meeting Date: 6/20/2023
Therefore, a total of twenty-two (22) vehicles that were approved by City Council for replacement in Fiscal Years 2021-22 and 2022-23 have not been secured through the Sourcewell contract. These vehicles include thirteen (13) light and medium duty trucks for the Maintenance Division, six (6) support and executive staff type vehicles, an animal control truck for the Police Department, and two (2) trucks to support operations in Parks and Community Services.
In order to address the vehicle procurement issue, Purchasing released an Invitation for Bid (IFB) No. 23-17 on PlanetBids on April 27, 2023, with a response date of May 17, 2023. However, the City received no bids. The IFB was modified after receiving feedback from potential vendors. IFB No. 23- 17 was released for a second time on May 22, 2023, with a response date of June 5, 2023. Once again, the City received no bids.
ANALYSIS:
The purchase of these vehicles is necessary in order to upgrade the City’sfleet of operable vehicles to serve the community and its stakeholders. The necessity of this purchase is exemplified by the continual breakdowns and repairs of the aging fleet of vehicles. The purchase will also provide vehicles to newly added staff that serve the community.
Traditional procurement avenues have been exhausted with no results. Approving the recommendation would allow staff to negotiate directly with one or more local authorized Ford dealership(s) to procure the vehicles necessary to ensure maintenance and safety operations.
Attachment 1 includes the complete list of approved vehicles from Fiscal Years 2021-22 and 2022-23 yet to be procured. Procurement of additional vehicles was also approved as part of the Fiscal Year 2023-24 budget.
ALTERNATIVES:
The City Council could choose not to authorize the direct purchase of vehicles from local authorized Ford dealerships. This is not recommended this would result in further delays in the procurement of approved vehicles and equipment. These delays could potentially result in safety issues as well as maintenance units not being in service promptly causing staff to be operating unreliable vehicles.
FISCAL REVIEW:
Funds for the replacement of City vehicles and equipment as proposed are included in the Equipment Replacement Fund’s Operating Budget.
LEGAL REVIEW:
The City Attorney’s Office has reviewed this report and approves it as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item works toward achieving the following City Council Goals:
· Strengthen the Public’s Safety and Improve Quality of Life · Advance Environmental Sustainability and Climate Resiliency
379
File #: 23-1270 Meeting Date: 6/20/2023
CONCLUSION:
Staff recommends the City Council:
1. Authorize by minute action, that compliance with the bidding requirements and procedures is inefficient and not in the best interest of the city, based on specifically identified conditions and supported by substantial evidence.
2. Authorize the purchase of Ford fleet vehicles from local authorized Ford dealerships.
3. Authorize the City Manager or designee to execute the necessary documents for the purchase of new and replacement City fleet vehicles as approved in Fiscal Years 2021-22, 2022-23, and 2023 -24 annual budgets.
380
381
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 23-1264 Meeting Date: 6/20/2023
TITLE:
RESOLUTION ADOPTING THE FY 2023-2024 STATEMENT OF INVESTMENT POLICY DEPARTMENT: FINANCE DEPARTMENT
PRESENTED BY: CAROL MOLINA, FINANCE DIRECTOR
CONTACT INFORMATION: CAROL MOLINA, FINANCE DIRECTOR, (714) 754-5243 RECOMMENDATION:
Staff recommends the City Council Adopt Resolution No. 2023-xx (Attachment 1) approving the Statement of Investment Policy for FY 2023-2024 (Attachment 2).
BACKGROUND:
Pursuant to California Government Code Section 53646(a)(2), the City Treasurer may annually render a statement of investment policy to the legislative body and any oversight committee, which the legislative body of the local agency shall consider at a public meeting. Any change in the policy shall also be considered by the legislative body of the local agency at a public meeting. City Council reviews and adopts the Invest Policy after City staff presents the policy and any recommended changes to the Finance and Pension Advisory Committee (FiPAC) for review.
The attached Investment Policy has been developed according to the specific needs of the City of Costa Mesa and complies with the California Government Code, guidelines from the California Municipal Treasurer’sAssociation (CMTA), and the Association of Public Treasurers of the United States and Canada (APTUS&C), as well as recommendations by Chandler Asset Management (Chandler), the City’s contracted investment manager.
ANALYSIS:
The City Treasurer, contracted investment manager, and staff annually review the Investment Policy, which follows requirements established by California Government Code, and recommend changes based on investment objectives, legislative changes, investment management practices, or the bond market and economy.
One of the City Treasurer’simportant statutory duties is set forth in California Government Code Section 41001, which states the “citytreasurer shall receive and safely keep all money the treasurer receives.” The basic premise underlying the City's investment philosophy is and continues to be, to ensure that surplus funds are always safe and available when needed. Criteria for selecting investments and the order of priority are:
1. Safety - It is the primary duty and responsibility of the City Treasurer to protect, preserve, and
382
File #: 23-1264 Meeting Date: 6/20/2023
1. Safety - It is the primary duty and responsibility of the City Treasurer to protect, preserve, and maintain intact cash and investments placed in trust with the City Treasurer.
2. Liquidity - An adequate percentage of the portfolio should be maintained in liquid short-term securities, which can be converted to cash if necessary to meet disbursement requirements.
3. Yield - The City Treasurer shall obtain the highest possible yield within the parameters of the City’s authorized investments, provided the criteria for safety and liquidity have been met.
Chandler reviewed the City’s Investment Policy as part of their investment management role to ensure compliance with the California Government Code. There were no material changes to the California Government Code. Therefore, no change is recommended to the City’s Investment Policy.
ALTERNATIVES:
Since there have been no changes to the City's Investment Policy, there are currently no alternative options.
FISCAL REVIEW:
There is no fiscal impact. This item is administrative in nature.
LEGAL REVIEW:
The City Attorney’s Office has reviewed this report and approved it as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the City Council Goal:
· Achieve Long-Term Fiscal Sustainability.
CONCLUSION:
Staff recommends the City Council Adopt Resolution No. 2023-xx (Attachment 1) approving the Statement of Investment Policy for FY 2023-2024 (Attachment 2).
383
Resolution No. 2023-xx Page 1 of 3
RESOLUTION NO. 2023-xx
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COSTA MESA, CALIFORNIA, ADOPTING THE 2023-2024 STATEMENT OF INVESTMENT POLICY
FOR THE CITY, AND DESIGNAT ING THE FINANCE DIRECTOR , ACTING AS CITY
TREASURER, TO INVEST AND REINVEST IDLE MONIES OF THE CITY OF COSTA MESA IN ACCORDANCE WITH THE 2023-2024 STATEMENT OF INVESTMENT POLICY
THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY
RESOLVE AS FOLLOWS:
WHEREAS, the City Council has established and each year approves a Statement of Investment Policy (“Policy”) pertaining to idle funds under the control of the City Treasurer; and
WHEREAS, the Policy specifies the City’s investment objectives in accordance with California law and provides a framework for managing and investing the City’s funds in accordance with these objectives; and
WHEREAS, the Policy provides that it must be reviewed on an annual basis by the Finance and Pension Advisory Committee and approved by the City Council in an open public meeting; and
WHEREAS, on February 23, 2023, the Finance and Pension Advisory Committee reviewed the Policy and approved staff recommendation; and WHEREAS, the City Council desires to approve the 2023-2024 Policy and delegate authority to the City Treasurer to invest idle funds.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Costa Mesa as follows:
1. In accordance with Section 53607 of the California Government Code, the City Council hereby authorizes the Finance Director, acting as the City Treasurer, (a) to invest such portion of idle money in the City Treasury, not required for the immediate necessities of the City as is deemed wise or expedient, in securities in which this City Council is authorized to invest such sums by the provisions of Go vernment Code Section 53601 and Section 53635, in accordance with the provisions of the City’s Statement of Investment Policy; and (b) to sell, or exchange for other eligible securities, ATTACHMENT 1
384
Resolution No. 2023-xx Page 2 of 3
and reinvest the proceeds of the securities purchased. The City Treas urer shall make a monthly report of such transactions to th e City Council. This delegation shall be valid for one (1) year pursuant to Government Code Section 53607.
2. The City Council hereby adopts the 2023-2024 Statement of Investment Policy as set forth in the attached document.
3. The City Clerk shall certify to the passage and adoption of this resolution, and it shall be thereupon in full force and effect.
PASSED AND ADOPTED this 20th day of June, 2023.
_____________________________
John Stephens, Mayor
ATTEST: APPROVED AS TO FORM:
________________________ _____________________________ Brenda Green, City Clerk Kimberly Hall Barlow, City Attorney 385
Resolution No. 2023-xx Page 3 of 3
THIS PAGE IS RESERVED FOR THE CITY CLERK’S OFFICE.
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF COSTA MESA )
I, BRENDA GREEN, City Clerk of the City of Costa Mesa, DO HEREBY CERTIFY that the above and foregoing is the original of Resolution No. 2023-xx and was duly passed and adopted by the City Council of the City of Costa Mesa at a regular meeting held on the 20th day of June, 2023, by the following roll call vote, to wit:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
IN WITNESS WHEREOF, I have hereby set my hand and affixed the seal of the City of Costa Mesa this 20th day of June, 2023.
___________________________
Brenda Green, City Clerk
386
EXHIBIT A
2022-2023 STATEMENT OF INVESTMENT POLICY
387
CITY OF COSTA MESA
STATEMENT OF INVESTMENT POLICY
2022-2023
I. GENERAL INTRODUCTION
Under the laws of the State of California, it is the responsibility of the City Treasurer, at the direction of the City Council, to secure and protect the public funds of the City, and to establish proper safeguards, controls, and procedures to maintain these funds in a lawful, rational and auspicious manner. Said maintenance shall include the prudent and secure investment of idle funds, in a manner anticipated to provide additional benefit to the people of the City of Costa Mesa. The City's Finance Director serves as the City Treasurer.
On an a
nnual basis, this Statement of Investment Policy will be reviewed by the Finance and Pension Advisory Committee and approved by the City Council in an open public meeting. It will be provided to securities dealers, banks, and brokers currently approved for conducting investment transactions with the City Treasurer's office in the ongoing effort to manage the investment portfolio; to other affected persons or entities; and to any members of the public wishing to review this document upon request. The Treasurer reserves the right to provide these documents on a cost basis.
II. SCOPE
This Statement of Investment Policy pertains to those idle funds under the control of the Treasurer, designated for the daily ongoing operations of the City; and concerns the deposit, maintenance, safekeeping, and preservation of all such funds, and the investments made with these funds. This Policy does not apply to pension trust funds, deferred compensation funds, and certain other trust or non-operating funds.
Ill. PURPOSE
The purpose of this Statement of Investment Policy is to provide the City Council, the Finance and Pension Advisory Committee, those involved in servicing the investment requirements of the City, and any other interested party, a clear understanding of the regulations and internal guidelines that will be observed in maintaining and investing City funds. This statement is intended to provide guidelines for the prudent investment of the City's temporary idle cash, and outline the procedures for maximizing the efficiency of the City's cash management system. The ultimate goal of the Investment Policy is to enhance the economic status of the City while safeguarding its assets.
IV. OBJECTIVE
The City's cash management system is designed to accurately monitor and forecast revenues and expenditures, thus enabling the City to invest funds to the fullest extent possible only after the criteria established for safety and liquidity have been met.
ATTACHMENT 2
388
2 The basic premise underlying the City's investment philosophy is and continues to be, to ensure that surplus funds are always safe and available when needed. The City strives to invest all idle funds as near 100 percent as possible, through daily and projected cash flow determinations. Idle cash management and investment transactions are the responsibility of the City Treasurer or his/her designee.
Criteria for selecting investments and the order of priority are:
1. Safety: The safety and risk associated with an investment refers to the potential loss of principal, interest, or a combination of these amounts. The City only operates in those investments that are considered prudent and allowable under current legislation of the State of California Government Code Section 53600 et seq. and the general laws of the City of Costa Mesa.
2. Liquidity: This refers to the ability to "cash in" at any moment in time with a minimal chance of losing some portion of principal or interest.
3. Yield: Yield is the potential dollar earnings an investment can provide, and sometimes is referred to as the rate of return.
V. DELEG&TION OF INVESTMENT AUTHORITY
Authority to manage the City of Costa Mesa's investment program is derived from City of Costa Mesa Council Resolution No. 20-xx. Management responsibility for the investment program is hereby delegated for Fiscal Year 2020-2021 to the City Treasurer or his/her designee, who shall establish written procedures for the operation of the investment program consistent with this Investment Policy. Procedures should include references to: safekeeping, repurchase agreements, wir e transfer agreements, banking service contracts, and collateral/ depository agreements. Such procedures shall include explicit delegation of authority to persons responsible for investment transactions. No person may engage in an investment transaction except as provided under the terms of this policy and the procedures established by the City Treasurer or his/her designee. The City Treasurer or his/her designee shall be responsible for all transactions undertaken and shall establish a system of controls to regulate the activities of subordinate officials.
The City may engage the services of an external investment manager to assist in the management of the City's investment portfolio in a manner consistent with the City's objectives. Such an external manager may be granted discretion to purchase and sell investment securities in accordance with this Investment Policy.
Such a manager must be registered under the Investment Advisers Act of 1940. 389
3 VI. STANDARD OF PRUDENCE
The Treasurer shall perform the investment function in conjunction with the Prudent Investor Standard as set forth in the California Government Code Section 53600.3: "... all governing bodies of local agencies or persons authorized to make investment decisions on behalf of those local agencies investing public funds pursuant to this chapter are trustees and therefore fiduciaries subject to the prudent investor standard. When investing, reinvesting, purchasing, acquiring, exchanging, selling, or managing public funds, a trustee shall act with care, skill, prudence, and diligence under the circumstances then prevailing, including, but not limited to, the general economic conditions and the anticipated needs of the City, that a prudent person acting in a like capacity and familiarity with those matters would use in the conduct of funds of a like character and with like aims, to safeguard the principal and maintain the liquidity needs of the City. Within the limitations of this section and considering individual investments as part of an overall strategy, investments may be acquired as authorized by law."
VII. AUTHORIZED AND SUITABLE INVESTMENTS
All investments will be made in accordance with Sections 53600 et seq. of the Government Code of California and as described within this Investment Policy. Permitted investments under this policy include:
l. Municipal Securities. These include obligations of the City, the State of California, any other states, and any local agency within the State of California, provided that:
a. Long-term obligations are rated "A" or higher, or the equivalent by at least one nationally recognized statistical rating organization (NRSRO);
b. The maximum maturity is five years; and
c. No more than 5 percent per issuer.
2. U.S. Treasury and other government obligations for which the full faith and credit of the United States are pledged for the payment of principal and interest. There are no limits on the dollar amount or percentage that the City may invest in U.S. Treasuries.
3. Federal Agency or United States government-sponsored enterprise obligations, participations, or other instruments, including those issued by or fully guaranteed as to principal and interest by federal agencies or United States government -sponsored enterprises . There are no limits on the dollar amount or percentage that the City may invest in government -sponsored enterprises. No more than 35 percent of the portfolio may be invested in any one issuer.
4. Banker's acceptances provided that:
a. They are issued by institutions with short term debt obligations rated "A-1" or higher, or the equivalent, by at least one NRSRO; and have long-term debt obligations which are rated "A" or higher, or the equivalent by at least one NRSRO;
b. The maturity does not exceed 180 days; and
c. No more than 40 percent of the total portfolio may be invested in banker's acceptances and no more than 5 percent per issuer.
390
4 5. Federally insured time deposits (Non-negotiable certificates of deposit) in state or federally chartered banks, savings and loans, or credit unions, provided that:
a. The amount per institution is limited to the maximum covered under FDIC; and, b. The maturity of such deposits does not exceed five years.
6. Time deposits (Non- negotiable certificates of deposit) in state or federally chartered banks, savings and loans, or credit unions in excess of FDIC insured amounts which shall be fully secured in accordance with California Government Code Section 53652, provided that:
a. No more than 20 percent of the portfolio will be invested in a combination of federally insured and collateralized time deposits;
b. No more than 5 percent per issuer;
c. They are issued by institutions which have long -term debt obligations which are rated "A" or higher, or the equivalent by at least one NRSRO; and/or have short term obligations rated "A-1" or higher, or the equivalent, by at least one NRSRO; and d. The maturity of such deposits does not exceed five years.
7. Certificate of Deposit Placement Service (CDARS)
a. No more than 30 percent of the total portfolio may be invested in a combination of certificates of deposit including CDARS; and
b. The maturity of CDARS deposits does not exceed five years.
8. Negotiable certificates of deposit (NCDs) provided that:
a. They are issued by institutions which have long -term obligations which are rated "A" or higher, or the equivalent by at least one NRSRO; and/or have short term debt obligations rated "A-1" or higher, or the equivalent, by at least one NRSRO; b. The maturity does not exceed five years; and
c. No more than 30 percent of the total portfolio may be invested in NCDs and no more than 5 percent per issuer.
9. Repurchase agreements collateralized with securities authorized under the City's Authorized and Suitable Investments (Section VII) of this policy maintained at a level of at least 102 percent of the market value of the repurchase agreements, provided that:
a. The maximum maturity of repurchase agreements will be one year; b. No more than 30 percent of the total portfolio may be invested in repurchase agreements; c. Securities used as collateral for repurchase agreements will be delivered to the City's custodian bank (See Section X); and
d. The repurchase agreements are the subject of a master repurchase agreement between the City and the provider of the repurchase agreement. The master repurchase agreement will be substantially in the form developed by the Securities Industry and Financial Markets Association (SIFMA).
391
5 10. Commercial paper provided that:
a. The maturity does not exceed 270 days from the date of purchase; b. The issuer is a corporation organized and operating in the United States with assets in excess of $500 million;
c. They are issued by institutions whose short term obligations are rated "A -1" or higher, or the equivalent, by at least one NRSRO; and whose long-term obligations are rated "A" or higher, or the equivalent by at least one NRSRO; and
d. No more than 25 percent of the portfolio is invested in commercial paper and no more than 5 percent per issuer.
11. State of California Local Agency Investment Fund (LAIF), provided that:
a. The City may invest up to the maximum permitted amount in LAIF; and, b. LAIF's investments in instruments prohibited by or not specified in the City's policy do not exclude it from the City's list of allowable investments, provided that the fund's reports allow the Finance Director/Treasurer to adequately judge the risk inherent in LAIF's portfolio.
12. Orange County Treasurer's Pool is a special fund in the County Treasury which local agencies may use to deposit funds for investment. The City may not invest more than 35 percent of its surplus money with the Orange County Treasurer's Pool. The County Treasurer charges investment administration fee to all pool participants. Investment earnings are distributed to the pool participants on a monthly basis, net of the administration fee. The earnings are credited to the participant's accounts on either the last day of the month or the first day of the subsequent month.
13. Corporate medium term notes (MTNs), provided that:
a. Such notes have a maximum maturity of five years;
b. Are issued by corporations organized and operating within the United States or by depository institutions licensed by the United States or any state and operating within the United States; c. Are rated "A" category or better, or the equivalent by at least one NRSRO; and d. Holdings of medium-term notes may not exceed 30 percent of the portfolio and no more than 5 percent per issuer.
14. Mortgage pass -through securities, collateralized mortgage obligations, and asset -backed securities, provided that such securities:
a. Have a maximum stated final maturity of five years;
b. Be issued by an issuer having an "A" or higher rating, or the equivalent for the issuer's debt as provided by an NRSRO;
c. Be rated in a rating category of "AA" or better, or its equivalent by an NRSRO; and d. Purchase of securities authorized by this subdivision may not exceed 20% of the portfolio and no more than 5 percent per issuer.
392
6 15. Money market mutual funds that are registered with the Securities and Exchange Commission under the Investment Company Act of 1940:
a. Provided that such funds meet either of the following criteria:
1. Attained the highest ranking or the highest letter and numerical rating provided by not less than two NRSRO; or
2. Have retained an investment adviser registered or exempt from registration with the Securities and Exchange Commission with not less than five years' experience investing in the securities and obligations authorized by California Government Code Section 53601 (a through j) and with assets under management in excess of $500 million. b. Purchase of securities authorized by this subdivision may not exceed 20 percent of the portfolio.
16. Supranational securities of United States dollar denominated senior unsecured unsubordinated obligations issued or unconditionally guaranteed by the International Bank for Reconstruction and Development, International Finance Corporation, or Inter -American Development Bank, with remaining maturity up to five years, and eligible for purchase and sale within the United States.
Investment under this section shall be rated "AA" or higher, or the equivalent by an NRSRO and shall not exceed 15 percent of the portfolio. No more than 5 percent of the portfolio shall be invested in one issuer.
VIII. INVESTMENT OF BOND PROCEEDS
When investing proceeds from the issuance of bonds, the City of Costa Mesa will follow this Investment Policy when determining allowable investments. Should the trust agreement of a particular bond issue be more restrictive than the City's policy on permitted investments, then the trust agreement will take precedence.
IX. CITY CONSTRAINTS
The City Treasurer or his/her designee will evaluate local banks and savings institutions and may invest idle cash funds with such institutions when the criteria for prudent investment previously stated are met. The City operates its investment pool according to State and self-imposed constraints. Any investment extending beyond a five-year period requires prior City Council approval. Additionally, a minimum of 20 percent of the outstanding investments must mature within a one -year time period.
X. SAFEKEEPING AND COLLATERALIZATION
All security transactions, including collateral for repurchase agreements, entered into by the City shall be conducted on a delivery -versus-payment (DVP) basis. Securities purchased shall be held in third party safekeeping in the Trust Department of a financial institution, in the City's name and control. The account established shall be protected from seizure by creditors should the financial institution holding the City's securities file for bankruptcy protection.
Collateralization will be required on two types of investments: certificates of deposit and repurchase agreements. In order to anticipate market changes and provide a level of security for all funds, a minimum collateralization level is required.
Surplus funds must be deposited in State or national banks, State or Federal savings and loan associations, or State or Federal credit unions within the State of California. The deposits cannot exceed the amount of the bank's or savings and loan's paid- up capital and surplus. 393
7 The bank or savings and loan must secure public funds deposits with eligible securities having a market value of 110 percent of the total amount of the deposits. State law also allows as an eligible security, first trust deeds having a value of 150 percent of the total amount of the deposits. A third class of collateral is 105 percent in the form of a letter of credit drawn on the Federal Home Loan Bank.
The City Treasurer or his/her designee may waive security for that portion of a deposit, which is insured pursuant to Federal law. Currently, the first $250,000 of a deposit is federally insured and deposits in excess of $250,000 are collateralized as previously indicated.
XL PORTFOLIO RISK MANAGEMENT
A. Prohibited investment vehicles and 12.ractices
1. State law notwithstanding, any investments not specifically described herein are prohibited, including, but not limited to futures and options, or stocks.
2. In accordance with Government Code Section 53601.6, investment in inverse floaters, range notes, or mortgage derived interest -only strips is prohibited.
3. Investment in any security that could result in a zero interest accrual if held to maturity is prohibited.
4. Trading securities for the sole purpose of speculating on the future direction of interest rates is prohibited.
5. Purchasing or selling securities on margin is prohibited.
6. The use of reverse repurchase agreements, securities lending or any other form of borrowing or leverage is prohibited.
7. The purchase of foreign currency denominated securities is prohibited.
B. Mitigating credit risk in the portfolio
Credit risk is the risk that a security or a portfolio will lose some or all of its value due to a real or perceived change in the ability of the issuer to repay its debt. The City will mitigate credit risk by adopting the following strategies:
1. The diversification requirements included in Section VII are designed to mitigate credit risk in the portfolio;
2. No more than 5 percent of the total portfolio may be invested in securities of any single issuer, other than the U.S. Government, its agencies and enterprises;
3. The City may elect to sell a security prior to its maturity and record a capital gain or loss in order to improve the quality, liquidity or yield of the portfolio in response to market conditions or City's risk preferences; and
394
8 4. If securities owned by the City are downgraded by an NRSRO to a level below the quality required by this Investment Policy, it will be the City's policy to review the credit situation and make a determination as to whether to sell or retain such securities in the portfolio.
a. If a security is downgraded, the Finance Director/ Treasurer will use discretion in determining whether to sell or hold the security based on its current maturity, the economic outlook for the issuer, and other relevant factors.
b. If a decision is made to retain a downgraded security in the portfolio, its presence in the portfolio will be monitored and reported monthly to the City Council.
C. Mitigating market risk in the portfolio
Market risk is the risk that the portfolio value will fluctuate due to changes in the general level of interest rates. The City recognizes that, over time, longer -term portfolios have the potential to achieve higher returns. On the other hand, longer-term portfolios have higher volatility of return.
The City will mitigate market risk by providing adequate liquidity for short-term cash needs, and by making longer -term investments only with funds that are not needed for current cashflow purposes. The City further recognizes that certain types of securities, including variable rate securities, securities with principal paydowns prior to maturity, and securities with embedded options, will affect the market risk profile of the portfolio differently in different interest rate environments. The City, therefore, adopts the following strategies to control and mitigate its exposure to market risk:
l. The City will maintain a minimum of three months of budgeted operating expenditures in short term investments to provide sufficient liquidity for expected disbursements;
2. The maximum percent of callable securities (does not include "make whole call" securities as defined in the Glossary) in the portfolio will be 20 percent;
3. The maximum stated final maturity of individual securities in the portfolio will be five years, except as otherwise stated in this policy; and
4. The duration of the portfolio will at all times be approximately equal to the duration (typically plus or minus 20 percent) of a Market Benchmark Index selected by the City based on the City's investment objectives, constraints and risk tolerances. The City's current Benchmark will be documented in the investment guidelines.
XII. POLICY COMPLIANCE REGULATIONS
Should the portfolio, for any reason, fall out of compliance with this Investment Policy, immediate liquidation of securities in order to bring the portfolio back into compliance is not required. However, the Treasurer must take action to bring the portfolio into compliance within 12 months from the date the portfolio was determined to be in non- compliance with the provisions of this Investment Policy so long as the action is deemed to be prudent under then current market conditions. Additionally, adequate disclosure as to all instances of noncompliance, and the efforts undertaken to bring the portfolio into compliance, must be made on the monthly Treasurer's Report.
395
9 XIII. REPORTING
Under provisions of Section 53646 of the California Government Code, the Treasurer or his/her designee shall render a quarterly investment report to the City Council, the City Manager, and the City Attorney within 30 days following the end of the quarter covered by the report. However, as a matter of practice, a monthly report shall be submitted listing the type of investments, institution, date of maturity, par value, amount of deposit, rate of interest, current market value for all securities, and such other data as may be required by the City Council on a monthly basis. Furthermore, a Finance and Pension Advisory Committee comprised of the following individuals will meet quarterly to review the City's portfolio and investment strategy.
• Mayor, or his/her designee
• City Treasurer
• Assistant Finance Director
• Revenue Supervisor
• Eleven Committee Members appointed by City Council who are either residents or conduct business within the City and have experience in banking, securities trading, or financial planning.
Monthly reports
Monthly investment reports will be submitted by the City Treasurer or his/her designee to the City Council members, the City Manager and the Finance and Pension Advisory Committee. These reports will disclose, at a minimum, the following information about the risk characteristics of the City's portfolio:
1. An asset listing showing par value, cost and accurate and complete market value of each security, type of investment, issuer, and interest rate;
2. Monthly transactions for the period;
3. A one-page summary report that shows:
a. Average maturity of the portfolio and modified duration of the portfolio; b. Maturity distribution of the portfolio;
c. Average portfolio credit quality; and,
d. Time-weighted total rate of return for the portfolio for the prior one month, three months, twelve months, year to date, and since inception compared to the Benchmark Index returns for the same periods;
4. A statement of compliance with investment policy, including a schedule of any transactions or holdings which do not comply with this policy or with the California Government Code Section 53600 et seq., including a justification for their presence in the portfolio and a timetable for resolution; and,
5. A statement that the City has adequate funds to meet its cash flow requirements for the next six months.
396
IO
X AUTHORIZED FINANCIAL INSTITUTIONS. DEPOSITORIES. AND BROKER/DEALERS
A list will be maintained of financial institutions and depositories authorized to provide investment services. In addition, a list will be maintained of approved security broker/dealers selected by conducting a process of due diligence described in the investment procedures manual. These may include "primary" dealers or regional dealers that qualify under Securities and Exchange Commission (SEC) Rule l 5C3- l (uniform net capital rule).
A. The City Finance Director/Treasurer will determine which financial institutions are authorized to provide investment services to the City. Institutions eligible to transact investment business with the City include:
1. Primary government dealers as designated by the Federal Reserve Bank and non- p
rimary government dealers;
2. Nationally or state-chartered banks;
3. The Federal Reserve Bank; and,
4. Direct issuers of securities eligible for purchase.
B. Selection of financial institutions and broker/dealers authorized to engage in transactions with the City will be at the sole discretion of the City.
C. All financial institutions which desire to become qualified bidders for investment transactions (and which are not dealing only with the investment adviser) must supply the Finance Director/Treasurer with a statement certifying that the institution has reviewed the California Government Code Section 53600 et seq. and the City's Investment Policy.
D. Selection of broker/dealers used by an external investment adviser retained by the City will be at the sole discretion of the investment adviser.
E. Public deposits will be made only in qualified public depositories as established by State law. Deposits will be insured by the Federal Deposit Insurance Corporation, or, to the extent the amount exceeds the insured maximum, will be collateralized in accordance with State law.
XV. POLICY REVIEW
This Statement of Investment Policy shall be reviewed at least annually to ensure its consistency with the overall objectives of preservation of principal, liquidity and return, and its relevance to current law, financial and economic trends.
Should conditions change or legislation become effective that behooves subsequent changes or a liberalization of terms within the policy during the next fiscal year, the revised policy will be submitted to both the Finance and Pension Advisory Committee and Council for adoption of the recommended action. 397
11 XVI. INVESTMENT OBJECTIVES (PERFORMANCE STANDARDS AND EVALUATION)
A. Overall objective: The investment portfolio will be designed with the overall objective of obtaining a total rate of return throughout economic cycles, commensurate with investment risk constraints and cash flow needs.
B. Specific objective: The investment performance objective for the portfolio will be to earn a total rate of return over a market cycle which is approximately equal to the return on the Market Benchmark Index as described in the City's investment guidelines.
398
12 CITY OF COSTA MESA
INVESTMENT GUIDELINES AND STRATEGY
I. GUIDELINES - Guidelines are established to direct and control activities in such a manner that previously established goals are achieved.
1. Investment Transactions. Investment transactions will be periodically reviewed by the Treasurer or his/her designee.
2. Pooled Cash. Whenever practical, City cash is consolidated into one bank account and invested on a pooled concept basis. Interest earnings are allocated monthly according to month-end cash and investment balances for each fund.
3. Competitive Bids. Purchase and sales of securities are made on the basis of competitive offers and bids when practical.
4. Cash Forecast. The cash flow for the City is analyzed with the receipt of revenues and maturity of investments scheduled so that adequate cash will be available to meet disbursement requirements.
5. Investment Limitations. Security purchases and holdings are maintained within statutory limits imposed by the California Government Code. Current limits are:
Bankers' Acceptances
Commercial Paper
Negotiable Certificates of Deposit
Medium Term Notes
Money Market Mutual Funds
Asset-Backed/Mortgage-Backed Securities
Federal Agency restriction
Local Agency Investment Fund
Orange County Treasurer's Pool
Supranational Securities
Portfolio Maturing within one year
40% Section 53601(g)
25% Section 5360l(h)
30% Section 5360l(i)
30% Section 5360l(k)
20% Section 53601(1)
20% Section 53601(0)
35% per Agency Section VII of Policy
$65,000,000 maximum allowed per Section
VII of Policy
35% per Section VII of Policy
15% per Section VII of Policy
20% per Section IX of Policy
6. Liquidity. The marketability of a security is considered at the time of purchase, as the security may have to be sold at a later date to meet unanticipated cash demands.
7. Diversification. The portfolio should consist of a mix of various types of securities, issuers, and maturities.
399
13 CITY OF COSTA MESA
INVESTMENT GUIDELINES AND STRATEGY
(Continued)
8. Evaluate Certificates of Deposit
(a) Certificates of Deposit shall be evaluated in terms of FDIC coverage. For deposits in excess of the FDIC insured maximum, approved collateral at full market value shall be required. (California Government Code Section 53652)
(b) Negotiable Certificates of Deposit shall be evaluated in terms of the credit worthiness of the issuer, as these deposits are uninsured and uncollateralized promissory notes.
9. Benchmark Index. The portfolio has a performance index of ICE BofAML 1-5 Year US Treasury & Agency Index. This index includes all securities with a remaining term to final maturity less than five years.
II. STRATEGY - Strategy refers to the ability to manage financial resources in the most advantageous manner.
1. Economic Forecasts. Economic Forecasts are obtained periodically from economists and financial experts through bankers and brokers to assist the Treasurer or his/her designee with the formulation of an investment strategy for the local agency.
2. Implementing Investment Strategy. Investment transactions are executed which conform with anticipated interest rate trends and the current investment strategy plan.
3. Rapport. A close working relationship is maintained with large vendors of the City. The objective is to pinpoint when large disbursements will clear the City's bank account. It is essential for good cash control that such large expenditures be anticipated, estimated as to dollar amount, and communicated to the Treasurer or his/her designee for liquidity planning purposes.
4. Preserve Portfolio Value. Field standards are developed in order to maintain earnings near the market and to preserve the value of the portfolio.
400
14 CITY OF COSTA MESA
INVESTMENT PROCEDURES
INTERNAL CONTROL - GUIDELINES
OBJECTIVES OF INTERNAL CONTROL
Internal control is the plan of organization and all the related systems established by the management's objective of ensuring, as far as practicable:
• The orderly and efficient conduct of its business, including adherence to management policies.
• The safeguarding of assets.
• The prevention or detection of errors and fraud.
• The accuracy and completeness of the accounting records.
• The timely preparation of reliable financial information.
LIMITATIONS OF INTERNAL CONTROL
No internal control system, however elaborate, can by itself guarantee the achievement of management's objectives. Internal control can provide only reasonable assurance that the objectives are met, because of its inherent limitations, including:
• Management's usual requirement that a control be cost-effective.
• The direction of most controls at recurring, rather than unusual, types of transactions.
• Human error due to misunderstanding, carelessness, fatigue, or distraction.
• Potential for collusion that circumvents controls dependent on the segregation of functions.
• Potential for a person responsible for exercising control abusing that responsibility; a responsible staff member could be in a position to override controls which management has set up. 401
15 CITY OF COSTA MESA
INVESTMENT PROCEDURES
INTERNAL CONTROL - GUIDELINES
(Continued)
ELEMENTS OF INTERNAL CONTROL
Elements of a system of internal control are the means by which an organization can satisfy the objectives of internal control. These elements are:
1. ORGANIZATION
Specific responsibility for the performance of duties should be assigned and lines of authority and reporting clearly identified and understood.
2. PERSONNEL
Personnel should have capabilities commensurate with their responsibilities. Personnel selection and training policies together with the quality and quantity of supervision are thus important.
3. SEGREGATION OF FUNCTIONS
Segregation of incompatible functions reduces the risk that a person is in a position both to perpetrate and conceal errors or fraud in the normal course of duty. If two parts of a transaction are handled by different people, collusion is necessary to conceal errors or fraud. In particular, the functions that should be considered when evaluating segregation of functions are authorization, execution, recording, custody of assets, and performing reconciliations.
4. AUTHORIZATION
All transactions should be authorized by an appropriate responsible individual. The responsibilities and limits of authorization should be clearly delineated. The individual or group authorizing a specific transaction or granting general authority for transactions should be in a position commensurate with the nature and significance of the transactions. Delegation of authority to authorize transactions should be handled very carefully.
5. CONTROLS OVER AN ACCOUNTING SYSTEM
Controls over an accounting system include the procedures, both manual and computerized, carried out independently to ascertain that transactions are complete, valid, authorized, and properly recorded. 402
16 CITY OF COSTA MESA
CASH CONTROLS
PROCEDURES PERFORMED BY EXTERNAL AUDITORS WITH RESPECT TO CASH RECEIPTS
A. City procedures and controls are reviewed. Some of the system strengths are:
1. Receipts are controlled upon receipt by proper registration devices.
2. Receipts are reconciled on a daily basis.
3. Amounts are deposited intact.
4. All bank accounts are authorized by City Manager.
5. Cash counts are done by two or more individuals.
6. Bank reconciliations are reviewed.
7. Prompt posting of cash receipt entries in books.
8. Receipt forms are prenumbered, accounted for, and physically secured.
9. Proper approval required for write-offs of customer accounts.
10. Checks are restrictively endorsed upon receipt or when run through cash register.
11. Adequate physical security over cash.
12. Individuals that handle cash do not post to customer account records or process billing statements.
13. Adequate supervision of Finance Department operations.
B. Significant revenues are confirmed directly with payor and compared with City books to make sure amounts are recorded properly.
C. Cash balances are substantiated by confirming all account balances recorded in books. Bank reconciliations are reviewed for propriety and recalculated by the auditor. All significant reconciling items on bank reconciliations are verified as valid reconciling items by proving to subsequent bank statements.
403
17 CITY OF COSTA MESA
SEGREGATION OF RESPONSIBILITIES OF
THE TREASURY FUNCTIONS
Function Responsibility
1. Authorization of investment
transactions:
Formal investment policy should be:
* Prepared by:
* Submitted to:
Investment transactions
should be approved by
2. Execution of investment
transactions
3. Investment transactions approved
for compliance with investment
policy and/or State law
4. Timely recording of investment
transactions:
Recording of investment
transactions in the
Treasurer's records
Recording of investment
transactions in the
accounting records
5. Verification of investment,
i.e., match broker confirma-
t
ion to Treasurer's records
City Treasurer
City Council
City Treasurer and/or External Investment
Manager
Assistant Finance Director and/or
Revenue Supervisor and/or External Investment
Manager
Assistant Finance Director and/or External
Investment Manager
Revenue Supervisor
Accounting Supervisor and/or
Accountant
Assistant Finance Director and/or
Revenue Supervisor and/or External Investment
Manager
6. Safeguarding of assets and records:
Reconciliation of Treasurer's
records to the accounting records
Reconciliation of Treasurer's
records to bank statements and
safekeeping records
404
18 Revenue Supervisor
Accounting Supervisor
and/or Accountant
405
19 CITY OF COSTA MESA
SEGREGATION OF RESPONSIBILITIES OF
THE TREASURY FUNCTIONS
(Continued)
Function Responsibility
6. Safeguarding of Assets and Records
(continued):
Annual review of (a) financial
institution's financial condition,
(b) safety, liquidity, and potential
yields of investment instruments.
Assistant Finance Director with
Treasurer's approval
7. No less than an annual
review of investment
portfolio as prepared by
Treasurer including:
• Investment types
• Purchase Price
• Par values
• Market values
• Maturity dates
• Investment yields
• Conformance to stated investment policy
• Safekeeping reports
8. Periodic review of investment
portfolio and strategies.
External Independent Auditors
Finance and Pension Advisory Committee
406
20 Glossary of Investment Terms
AGENCIES. Shorthand market terminology for any obligation issued by a government-sponsored entity (GSE), or a federally related institution. Most obligations of GSEs are not guaranteed by the full faith and credit of the US government. Examples are:
FFCB. The Federal Farm Credit Bank System provides credit and liquidity in the agricultural industry.
FFCB issues discount notes and bonds.
FHLB. The Federal Home Loan Bank provides credit and liquidity in the housing market. FHLB issues discount notes and bonds.
FHLMC. Like FHLB, the Federal Home Loan Mortgage Corporation provides credit and liquidity in the housing market. FHLMC, also called "FreddieMac" issues discount notes, bonds and mortgage pass-through securities.
FNMA. Like FHLB and FreddieMac, the Federal National Mortgage Association was established to provide credit and liquidity in the housing market. FNMA , also known as "FannieMae," issues discount notes, bonds and mortgage pass -through securities.
GNMA. The Government National Mortgage Association, known as "GinnieMae," issues mortgage pass-through securities, which are guaranteed by the full faith and credit of the US Government.
PEFCO. The Private Export Funding Corporation assists exporters. Obligations of PEFCO are not guaranteed by the full faith and credit of the US government.
TVA. The Tennessee Valley Authority provides flood control and power and promotes development in portions of the Tennessee, Ohio, and Mississippi River valleys. TVA currently issues discount notes and bonds.
ASKED. The price at which a seller offers to sell a security.
ASSET BACKED SECURITIES. Securities supported by pools of installment loans or leases or by pools of revolving lines of credit.
AVERAGE LIFE. In mortgage-related investments, including CMOs, the average time to expected receipt of principal payments, weighted by the amount of principal expected.
BANKER'S ACCEPTANCE. A money market instrument created to facilitate international trade transactions.
It is highly liquid and safe because the risk of the trade transaction is transferred to the bank which "accepts" the obligation to pay the investor.
BENCHMARK. A comparison security or portfolio. A performance benchmark is a partial market index, which reflects the mix of securities allowed under a specific investment policy.
BID. The price at which a buyer offers to buy a security.
BROKER. A broker brings buyers and sellers together for a transaction for which the broker receives a commission. A broker does not sell securities from his own position.
CALLABLE. A callable security gives the issuer the option to call it from the investor prior to its maturity.
The main cause of a call is a decline in interest rates. If interest rates decline since an issuer issues securities, it will likely call its current securities and reissue them at a lower rate of interest. Callable securities have reinvestment risk as the investor may receive its principal back when interest rates are lower than when the investment was initially made.
CERTIFICATE OF DEPOSIT (CD). A time deposit with a specific maturity evidenced by a certificate. Large denomination CDs may be marketable.
CERTIFICATE OF DEPOSIT ACCOUNT REGISTRY SYSTEM (CDARS). A private placement service that allows local agencies to purchase more than $250,000 in CDs from a single financial institution (must be a participating institution of CDARS) while still maintaining FDIC insurance coverage.
CDARS is currently the only entity providing this service. CDARS facilitates the trading of deposits between the California institution and other participating institutions in amounts that are less than $250,000 each, so that FDIC coverage is maintained.
407
21 COLLATERAL. Securities or cash pledged by a borrower to secure repayment of a loan or repurchase agreement. Also, securities pledged by a financial institution to secure deposits of public monies.
COLLATERALIZED MORTGAGE OBLIGATIONS (CMO). Classes of bonds that redistribute the cash flows of mortgage securities (and whole loans) to create securities that have different levels of prepayment risk, as compared to the underlying mortgage securities.
COMMERCIAL PAPER. The short-term unsecured debt of corporations.
COST YIELD. The annual income from an investment divided by the purchase cost. Because it does not give effect to premiums and discounts which may have been included in the purchase cost, it is an incomplete measure of return.
COUPON. The rate of return at which interest is paid on a bond.
CREDIT RISK. The risk that principal and/or interest on an investment will not be paid in a timely manner due to changes in the condition of the issuer.
CURRENT YIELD. The annual income from an investment divided by the current market value. Since the mathematical calculation relies on the current market value rather than the investor's cost, current yield is unrelated to the actual return the investor will earn if the security is held to maturity.
DEALER. A dealer acts as a principal in security transactions, selling securities from and buying securities for his own position.
DEBENTURE. A bond secured only by the general credit of the issuer.
DELIVERY vs. PAYMENT (DVP). A securities industry procedure whereby payment for a security must be made at the time the security is delivered to the purchaser's agent.
DERIVATIVE. Any security that has principal and/or interest payments which are subject to uncertainty (but not for reasons of default or credit risk) as to timing and/or amount, or any security which represents a component of another security which has been separated from other components ("Stripped" coupons and principal). A derivative is also defined as a financial instrument the value of which is totally or partially derived from the value of another instrument, interest rate, or index.
DISCOUNT. The difference between the par value of a bond and the cost of the bond, when the cost is below par. Some short -term securities, such as T -bills and banker's acceptances, are known as discount securities. They sell at a discount from par, and return the par value to the investor at maturity without additional interest. Other securities, which have fixed coupons, trade at a discount when the coupon rate is lower than the current market rate for securities of that maturity and/or quality.
DIVERSIFICATION. Dividing investment funds among a variety of investments to avoid excessive exposure to any one source of risk.
DURATION. The weighted average time to maturity of a bond where the weights are the present values of the future cash flows. Duration measures the price sensitivity of a bond to changes in interest rates. (See modified duration).
FEDERAL FUNDS RATE. The rate of interest charged by banks for short -term loans to other banks. The Federal Reserve Bank through open -market operations establishes it.
FEDERAL OPEN MARKET COMMITTEE. A committee of the Federal Reserve Board that establishes monetary policy and executes it through temporary and permanent changes to the supply of bank reserves.
LEVERAGE. Borrowing funds in order to invest in securities that have the potential to pay earnings at a rate higher than the cost of borrowing.
LIQUIDITY. The speed and ease with which an asset can be converted to cash.
LOCAL AGENCY INVESTMENT FUND (LAIF). A voluntary investment fund open to government entities and certain non-profit organizations in California that is managed by the State Treasurer's Office.
LOCAL GOVERNMENT INVESTMENT POOL. Investment pools that range from the State Treasurer's Office Local Agency Investment Fund (LAIF) to county pools, to Joint Powers Authorities (JPAs). These funds are not subject to the same SEC rules applicable to money market mutual funds.
MAKE WHOLE CALL. A type of call provision on a bond that allows the issuer to pay off the remaining debt early. Unlike a call option, with a make whole call provision, the issuer makes a lump sum 408
22 payment that equals the net present value (NPV) of future coupon payments that will not be paid because of the call. With this type of call, an investor is compensated, or "made whole." MARGIN. The difference between the market value of a security and the loan a broker makes using that security as collateral.
MARKET RISK. The risk that the value of securities will fluctuate with changes in overall market conditions or interest rates.
MARKET VALUE. The price at which a security can be traded.
MARKING TO MARKET. The process of posting current market values for securities in a portfolio.
MATURITY. The final date upon which the principal of a security becomes due and payable.
MEDIUM TERM NOTES. Unsecured, investment-grade senior debt securities of major corporations which are sold in relatively small amounts on either a continuous or an intermittent basis. MTNs are highly flexible debt instruments that can be structured to respond to market opportunities or to investor preferences.
MODIFIED DURATION. The percent change in price for a 100 basis point change in yields. Modified duration is the best single measure of a portfolio's or security's exposure to market risk.
MONEY MARKET. The market in which short-term debt instruments (T-bills, discount notes, commercial paper, and banker's acceptances) are issued and traded.
MORTGAGE PASS -THROUGH SECURITIES. A securitized participation in the interest and principal cash flows from a specified pool of mortgages. Principal and interest payments made on the mortgages are passed through to the holder of the security.
MUNICIPAL SECURITIES. Securities is sued by state and local agencies to finance capital and operating expenses.
MUTUAL FUND. An entity which pools the funds of investors and invests those funds in a set of securities which is specifically defined in the fund's prospectus. Mutual funds can be invested in various types of domestic and/or international stocks, bonds, and money market instruments, as set forth in the individual fund's prospectus. For most large, institutional investors, the costs associated with investing in mutual funds are higher than the investor can obtain through an individually managed portfolio.
NATIONALLY RECOGNIZED STATISTICAL RATINGS ORGANIZATION (NRSRO).
A credit rating agency that the Securities and Exchange Commission in the United States uses for regulatory purposes. Credit rating agencies provide assessments of an investment's risk. The issuers of investments, especially debt securities, pay credit rating agencies to provide them with ratings. The three most prominent NRSROs are Fitch, S&P, and Moody's.
NEGOTIABLE CD. A short-term debt instrument that pays interest and is issued by a bank, savings or federal association, state or federal credit union, or state-licensed branch of a foreign bank. Negotiable CDs are traded in a secondary market and are payable upon order to the bearer or initial depositor (investor).
PREMIUM. The difference between the par value of a bond and the cost of the bond, when the cost is above par.
PREPAYMENT SPEED. A measure of how quickly principal is repaid to investors in mortgage securities.
PREPAYMENT WINDOW. The time period over which principal repayments will be received on mortgage securities at a specified prepayment speed.
PRIMARY DEALER. A financial institution (1) that is a trading counterparty with the Federal Reserve in its execution of market operations to carry out U.S. monetary policy, and (2) that participates for statistical reporting purposes in compiling data on activity in the U.S. Government securities market.
PRUDENT PERSON (PRUDENT INVESTOR) RULE. A standard of responsibility which applies to fiduciaries.
In California, the rule is stated as "Investments shall be managed with the care, skill, prudence and diligence, under the circumstances then prevailing, that a prudent person, acting in a like capacity and familiar with such matters, would use in the conduct of an enterprise of like character and with like aims to accomplish similar purposes."
409
23 REALIZED YIELD. The change in value of the portfolio due to interest received and interest earned and realized gains and losses. It does not give effect to changes in market value on securities, which have not been sold from the portfolio.
REGIONAL DEALER. A financial intermediary that buys and sells securities for the benefit of its customers without maintaining substantial inventories of securities and that is not a primary dealer.
REPURCHASE AGREEMENT. Short-term purchases of securities with a simultaneous agreement to sell the securities back at a higher price. From the seller's point of view, the same transaction is a reverse repurchase agreement.
SAFEKEEPING. A service to bank customers whereby securities are held by the bank in the customer's name.
STRUCTURED NOTE. A complex, fixed income instrument, which pays interest, based on a formula tied to other interest rates, commodities or indices. Examples include inverse floating rate notes which have coupons that increase when other interest rates are falling, and which fall when other interest rates are rising, and "dual index floaters," which pay interest based on the relationship between two other interest rates - for example, the yield on the ten-year Treasury note minus the Libor rate. Issuers of such notes lock in a reduced cost of borrowing by purchasing interest rate swap agreements.
SUPRANATIONAL. A Supranational is a multi-national organization whereby member states transcend national boundaries or interests to share in the decision making to promote economic development in the member countries.
TOTAL RATE OF RETURN. A measure of a portfolio's performance over time. It is the internal rate of return, which equates the beginning value of the portfolio with the ending value; it includes interest earnings, realized and unrealized gains, and losses in the portfolio.
U.S. TREASURY OBLIGATIONS. Securities issued by the U.S. Treasury and backed by the full faith and credit of the United States. Treasuries are considered to have no credit risk, and are the benchmark for interest rates on all other securities in the US and overseas. The Treasury issues both discounted securities and fixed coupon notes and bonds.
TREASURY BILLS. All securities issued with initial maturities of one year or less are issued as discounted instruments, and are called Treasury bills. The Treasury currently issues three - and six-month T- bills at regular weekly auctions. It also issues "cash management" bills as needed to smooth out cash flows.
TREASURY NOTES. All securities issued with initial maturities of two to ten years are called Treasury notes, and pay interest semi-annually.
TREASURY BONDS. All securities issued with initial maturities greater than ten years are called Treasury bonds.
Like Treasury notes, they pay interest semi-annually.
VOLATILITY. The rate at which security prices change with changes in general economic conditions or the general level of interest rates.
YIELD TO MATURITY. The annualized internal rate of return on an investment which equates the expected cash flows from the investment to its cost.
410
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 23-1269 Meeting Date: 6/20/2023
TITLE:
AMENDMENT NUMBER THREE TO PROFESSIONAL SERVICES AGREEMENT WITH LYONS SECURITY SERVICE, INC.
DEPARTMENT: PARKS AND COMMUNITY SERVICES
PRESENTED BY: JASON MINTER, PARKS AND COMMUNITY SERVICES
DIRECTOR
CONTACT INFORMATION: JASON MINTER, PARKS AND COMMUNITY SERVICES DIRECTOR (714) 754 - 5009
RECOMMENDATION:
Staff recommends the City Council:
1. Approve proposed Amendment No 3 to the Professional Services Agreement (PSA) with Lyons Security Services, Inc., increasing the maximum compensation by $45,000 for unarmed security guard services for the Lions Park Campus and the Costa Mesa Senior Center, for a total not-to- exceed amount of $300,000 with a contingency of 10%, or $30,000, for a total amount of $330,000.
2. Authorize the City Manager and City Clerk to execute the agreement and all future amendments to the Professional Services Agreement.
BACKGROUND:
The City entered into a professional services agreement to provide security guard services at the Costa Mesa Senior Center (CMSC) in 2014 when the City assumed operations of the facility. In January 2019, City Council approved additional security guard services for the Lions Park Campus on a 24/7/365 basis to monitor activity on the entire campus.
In March 2019, a Request for Proposals (RFP) was released for security guard services at both Lions Park and the Senior Center. Subsequently, in June 2019, City Council approved a Professional Services Agreement (PSA) with Lyons Security for a two (2) year term with three (3) one-year renewal options. This agreement also included an annual Not-to-Exceed (NTE) amount of $255,000 with a contingency of 10%, or $25,500, for a total amount of $280,500.
In 2020, security guard services at the Senior Center were halted as a cost saving measure due to facility closures caused by the COVID-19 pandemic. Security guard services did not resume at the Senior Center until March 2022 when it was determined by staff that the entirety of Lions Park and
411
File #: 23-1269 Meeting Date: 6/20/2023
the Senior Center could not be adequately patrolled by a single security guard.
In July 2022, the City and Lyons Security Service amended the agreement to enter into the second renewal period for Fiscal Year (FY) 2022-23. In addition to extending the term of the agreement, Amendment Number Two also included an hourly rate increase along with the reinstatement of full services from the original agreement.
ANALYSIS:
The need for security guard services at both the Lions Park Campus and the Costa Mesa Senior Center continues to be a priority and aligns with the City Council Strategic Plan goal to Strengthen the Public’sSafety and Improve the Quality of Life. In evaluating the existing agreement, it was determined that the NTE contract amount and contingency was not increased with Amendment Two, and remains at $280,500 annually, despite the increase in hourly rates for security guard personnel for FY 2022-23 as stipulated in the Amendment.
Currently, the projected cost to the City for security guard services through June 30, 2023, totals $285,000, which is $4,500 more than the NTE and contingency. This request is to increase the NTE amount of the PSA with Lyons Security to $300,000 to cover the shortage in FY 2022-23 and to fully fund security guard services through June 30, 2024.
ALTERNATIVES:
City Council may direct staff to alter security guard services hours at the Costa Mesa Senior Center and Lions Park; however, staff does not recommend this action as the public’ssafety and monitoring activity at these City facilities is a priority.
FISCAL REVIEW:
Funding for security guard services is available in the Parks and Community Services Department operating budget for FY 2022-23 and FY 2023-24.
LEGAL REVIEW:
The City’s Attorney’s Office has reviewed this report and approved as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the following City Council Goal:
· Strengthen the Public’s Safety and Improve the Quality of Life
412
File #: 23-1269 Meeting Date: 6/20/2023
CONCLUSION:
Staff recommends the City Council:
1. Approve proposed Amendment No 3 to the Professional Services Agreement (PSA) with Lyons Security Services, Inc., increasing the maximum compensation by $45,000 for unarmed security guard services for the Lions Park Campus and the Costa Mesa Senior Center, for a total not-to- exceed amount of $300,000 with a contingency of 10%, or $30,000, for a total amount of $330,000.
2. Authorize the City Manager and City Clerk to execute the agreement and all future amendments to the Professional Services Agreement.
413
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 23-1189 Meeting Date: 6/20/2023
TITLE:
SMART CAMP MEMORANDUM OF UNDERSTANDING
DEPARTMENT: PARKS AND COMMUNITY SERVICES
PRESENTED BY: JASON MINTER, PARKS AND COMMUNITY SERVICES
DIRECTOR
CONTACT INFORMATION: JASON MINTER, PARKS AND COMMUNITY SERVICES DIRECTOR, (714) 754-5009
RECOMMENDATION:
Staff recommends the City Council approve the Memorandum of Understanding (MOU) between the City and Newport-Mesa Unified School District to provide SMART Camp to Costa Mesa residents and authorize the City Manager and City Clerk to execute the agreement and future amendments to the agreement.
BACKGROUND:
Sports, Music, and Art (SMART) Camp is a free summer camp provided to Costa Mesa’syouth through a joint partnership between the City of Costa Mesa (City) and the Newport Mesa Unified School District (NMUSD). SMART Camp includes three different program areas in which participants receive instruction in various sports, through different artistic mediums, and with a variety of musical instruments. NMUSD Teachers and Coaches provide coordination and instruction in these program areas. Participation is limited to Costa Mesa residents entering 4th through 8th grades.
SMART Camp has been a joint partnership since 2014, with the City handling marketing and registration, and funding all NMUSD teachers and coaches that are hired as SMART Camp contract instructors/coordinators. Over the years, NMUSD has provided busing, nutrition, and use of various camp equipment, classrooms, facilities and fields. In 2019, the League of Cities recognized SMART Camp for its innovative approach to providing high quality enrichment programing to the City’syouth free of charge.
ANALYSIS:
SMART Camp is a highly successful program that has approximately 1,000 enrollments on an annual basis. Planning for SMART Camp requires coordination from various City and NMUSD staff to ensure the camp’s execution is a success. There is traditionally a kick-off meeting in late January, with planning taking place through the month of May. SMART Camp is conducted exclusively on NMUSD property and occurs on campus simultaneously with NMUSD summer school sessions.
In prior years, the planning process between NMUSD and the City had been largely informal. SMART
414
File #: 23-1189 Meeting Date: 6/20/2023
In prior years, the planning process between NMUSD and the City had been largely informal. SMART Camp has grown in popularity and is now a staple of the Parks and Community Services Department’s summer offerings.
The request to create an official Memorandum of Understanding to formalize responsibilities of each party became a necessity due to the expansive scope of SMART Camp’scomponents in conjunction with staff turnover at the City and NMUSD.
This memorandum of understanding (MOU) between the City and NMUSD largely describes the camp as it has occurred since 2014. City staff have conferred with NMUSD staff on the substance of the agreement and arrived at the current draft in mutual agreement (Attachment 1). This agreement is set to go before the NMUSD School Board on June 13, 2023. The term of the agreement is retroactive to June 12, 2023, the first day of 2023 SMART Camp. The term shall continue for a period of five (5) years, ending on August 20, 2028, and will automatically renew every five (5) years thereafter.
One change that is not specifically stated in the MOU, but was recommended by the City Attorney and Risk Manager, is the implementation of additional liability insurance for the contracted teachers and coaches. This additional policy is being implemented for the current SMART Camp program.
ALTERNATIVES:
City Council may direct staff to continue the planning and operation of SMART Camp with NMUSD on an informal basis.
FISCAL REVIEW:
The SMART Camp program is currently included in the Parks and Community Services Department’s annual operating budget.
LEGAL REVIEW:
The City’s Attorney’s Office has reviewed this report and approves it as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the following City Council Goal:
· Strengthen the Public’s Safety and Improve the Quality of Life CONCLUSION:
SMART Camp is an exciting and engaging camp experience that provides valuable enrichment opportunities to our youth in the community. The combination of Sports, Music, and Art in one camp has created a well-rounded program that, with the help of NMUSD teachers and coaches, can improve the quality of life here in the City of Costa Mesa.
Therefore, staff recommends the City Council approve the Memorandum of Understanding (MOU) between the City and Newport-Mesa Unified School District to provide SMART Camp to Costa Mesa residents and authorize the City Manager and City Clerk to execute the agreement and future amendments to the agreement.
415
1 MEMORANDUM OF UNDERSTANDING
BETWEEN THE CITY OF COSTA MESA
AND THE NEWPORT MESA UNIFIED SCHOOL DISTRICT (NMUSD)
FOR SPORTS, MUSIC, AND ART (SMART) CAMP
This Memorandum of Understanding ("Agreement"), entered into this 12 day of June, 2023 ("Effective Date"), by and between the CITY OF COSTA MESA, a municipal corporation ("City"), and the NEWPORT MESA UNIFIED SCHOOL DISTRICT (NMUSD) , to establish joint programming opportunities for the benefit of youth in Costa Mesa.
MISSION STATEMENT
It is the stated goal of this Agreement to have a working partnership between the City and NMUSD to provide a seasonal Sports, Music, and Art (SMART) Camp to the community’s youth at no cost to the participants.
RECITALS
Whereas, City is a municipal corporation duly organized and validly existing under the Constitution and the laws of the State of California.
Whereas, NMUSD is a government entity that provides public elementary and/or secondary education to students within a specific territory.
Whereas, the City is committed to providing programs and services in an equitable manner that enrich the lives of its youth and whose desire it is to expand its services to reach as many youth as possible.
Whereas, NMUSD in partnership with the Costa Mesa - Newport Beach communities, has a mission to graduate students who have acquired the knowledge, skills, and attitudes necessary to achieve significant care er, educational, civic, and personal goals, which will enrich our society.
Whereas, NMUSD and the City have collaborated to provide free summer instructional classes in sports, music, and art on NMUSD campuses , taught by NMUSD teachers and coaches, to the community’s youth since 2014.
NOW THEREFORE, for and in consideration of the mutual covenants and conditions set forth herein, City and NMUSD agree as follows:
1.0 TERM
The term of this Agreement shall commence on the Effective Date and continue for a period of five (5) years, ending on August 30, 2028, and will automatically renew every five ATTACHMENT 1
416
2 (5) years thereafter , provided both parties are in agreement and unless previous ly terminated as provided herein.
2.0 SMART CAMP OPERATION
2.1 Structure
(a) SMART Camp will consist of a series of instructional classes separated into three components: 1) sports, 2) music, and 3) visual and performing arts.
(b) Each component of SMART Camp shall be led by a Camp Coordinator.
Coordinators shall develop the course curriculum, select classrooms and athletic facilities, procure Camp equipment, and supervise SMART Camp Instructors.
(c) SMART Camp Instructors will provide instruction to Camp participants under the general supervision of the Camp Coordinator.
(d) SMART Camp Instructors and Coordinators shall be compensated by the City as independent contractors but must hold q ualifications as determined by NMUSD, or another district in Orange County, as teachers or coaches in good standing and must maintain all relevant certifications and credentials required of those positions. (e) Each component of SMART camp shall provide adequate instruction to accommodate all skill levels of each activity.
(f) The sports comp onent shall exclude any aquatic -related activities or sports and any use of artificial turf fields.
(g) SMART Camp shall require ad vance participant registration; drop -in participation will not be permitted.
(h) SMART Camp will be limited to Costa Mesa residents and NMUSD students entering the fourth through eighth grades.
(i) SMART Camp must be free to all eligible participants.
2.2 Duration
(a) SMART Camp shall take place only within the summer season, as established by the NMUSD academic calendar.
(b) Sports, Music, and Art components will not exceed twelve (12) total class sessions.
417
3 (c) Art and Music class sessions will be held daily on weekdays unless otherwise noted for holidays, will not take place more than 4 days per week, and m ay not exceed three (3) hours in length per day. Sports class sessions will be held daily on weekdays unless otherwise no ted, will not take place more than 4 days per week, and may not exceed two (2) hours in length.
2.3 Location
(a) SMART Camp shall be conducted exclusively on the designated NMUSD campuses, as determined by NMUSD, and no portion of the camp shall be held off NMUSD property.
3.0 CITY RESPONSIBILITIES
3.1 Staff
(a) City will provide a primary staff liaison to represent the City during the planning and operation of SMART Camp.
(b) City will provide ancillary staff prior to and through the duration of SMART Camp to assist with handling class registration and to provide a point of contact for the public.
(c) City will employ NMUSD personnel as independent contract Instructors and Coordinators for the agreed upon duration of SMART Camp. (d) All independent contractors will report to and be supervised by the City’s designated staff liaison.
3.2 Marketing & Registration
(a) City will prepare and disseminate marketing and registration materials to promote SMART Camp.
(b) City staff will seek NMUSD approval on all materials prior to dissemination containing both the City and NMUSD insignia. (c) City shall be the exclusive point of contact for registration for SMART Camp, offering online and in-person registration throughout the duration of camp.
418
4 (d) City shall require parent and/or guardian signatures of all Camp participants on waivers that indemnify and hold harmless both the City and NMUSD prior to participation in any Camp activities. (e) City shall maintain accurate participant records, including participant contact information and camp rosters, in accordance with City’s Record Retention Schedule.
(f) City will provide registration information and statistics to NMUSD upon request.
(g) If NMUSD elects to provide transportation as stipulated in Section 4.4 (a), City will provide relevant NMUSD personnel with weekly transportation rosters beginning the week prior to Camp’s start date and through Camp’s conclusion.
3.3 Funding
(a) City will allocate funding to pay NMUSD personnel as contracted instructors for the duration of SMART camp as established in Section
2.2 of the Memorandum of Understanding.
(b) SMART Camp Coordinator and Instructor hourly wage shall be based off the NMUSD’s salary schedule.
(c) The City will provide funding to NMUSD for the purchase camp materials. The amount of funding provided will be mutually agreed upon by NMUSD and City on an annual basis.
3.4 Miscellaneous
(a) City shall be responsible for placing adequate directional signage at the designated camp location and removing signage materials at the conclusion of camp.
(b) City will handle minor disciplinary issues with camp participants in accordance with the City’s Disciplinary Rules and Regulations for youth camps and programs. City staff shall report all disciplinary issues to NMUSD that include, but are not limited to: criminal behavior, unlawful harassment, and suspected instances of child abuse.
4.0 NMUSD DUTIES
4.1 Staff
419
5 (a) NMUSD personnel authorized to allocate space on NMUSD property for the purposes of conducting SMART Camp in coordination with NMUSD summer school activities and programs shall participate in SMART Camp planning meetings with City staff beginning in February of each calendar year.
(b) NMUSD will make recommendations to the City on qualified personnel to serve as Camp Coordinators as described in 2.1 (a) and 2.1 (b). Once selected, and prior to working as independent contractors for the City, Coordinators will attend planning meetings with aforementioned NMUSD and City personnel.
(c) NMUSD may allow its interested and eligible employees to work as independent contractors for the City for the duration of SMART Camp, subject to the following conditions:
(i) NMUSD employees shall not be required to work as independent contractors for the City for SMART Camp and may decline to participate at their discretion.
(ii) NMUSD employees who choose to work as independent
contractors for the City during SMART Camp shall do so on a voluntary basis and shall be compensate d as independent contractors by the City.
(iii) NMUSD employees who work as independent contractors for the City during SMART Camp shall neither be considered employees of the City nor NMUSD, and the City nor NMUSD shall n ot be responsible for providing them with any employee benefits, including workers' compensation, unemployment insurance, or any other benefits that may be available to City or NMUSD employees.
(iv) NMUSD employees who work as independent contractors for the City during SMART Camp shall be subject to the City's policies and procedures governing independent contractors, including but not limited to those related to insurance, liability, and compliance with all applicable laws and regulations.
(d) In addition to joint planning meetings beginning in February, NMUSD will allocate limited staff time to allow for the planning and preparation of SMART Camp , which may include: producing or procuring camp materials and equipment, planning curriculums , and establishing a Camp Instructor roster.
420
6 (e) NMUSD will provide on-site contact information for custodial personnel for the duration of SMART Camp.
4.2 Facilities and Equipment
(a) NMUSD will reserve athletic facilities and classrooms , that it deems most appropriate, prior to the beginning of SMART Camp for the agreed upon duration of Camp.
(b) NMUSD will reserve and coordinate use of NMUSD-owned athletic equipment, musical instruments, art materials, and use of any other relevant equipment with Camp Coordinators prior to and throughout the duration of SMART Camp.
(c) NMUSD will ensure SMART Camp classrooms, athletic fields, and all pedestrian walkways from the exterior of the campus are accessible prior to the beginning of SMART Camp and are lo cked and secured at the end of SMART Camp.
(d) NMUSD will provide established emergency procedures for the designated SMART Camp location(s). This may include but is not limited to: emergency procedures for fires, earthquakes, and campus lockdowns; designated evacuations routes; and designated rally points. (e) NMUSD will provide limited space to City for storage of a portable canopy, a folding table, and a supply box for the purpose of supporting on-site and day -of registration at select dates during the duration of SMART Camp.
4.3 Marketing
(a) NMUSD will provide free access to distribute SMART camp flyer through PeachJar.
(b) NMUSD insignia shall be printed on all marketing and registration materials alongside City insignia for joint program display.
4.4 Transportation
(a) NMUSD may elect to provide transportation to or from SMART Camp at the expense of the NMUSD. If NMUSD elects to provide transportation, NMUSD transportation staff shall prov ide the City with route plans with accurate drop -off and pick -up times prior to the established SMART Camp registration date. Transportation staff will 421
7 remain in communication with City staff throughout the duration of SMART Camp to ensure safe transit for all eligible participants.
4.5 Nutrition
(a) NMUSD may elect to provide meals to SMART Camp participants, free of charge, as a part of its summer nutritional program, if camp sessions take place in the morning and in the afternoon.
5.0 TERMINATION
NMUSD or City may terminate this Agreement without cau se at any time, by giving one hundred -eighty (18 0) days' wr itten notice to the other party . The notice shall be deemed given when personally delivered to the NMUSD or City representative or three (3) days after the date the notice is deposited in the United States mail, first -class postage paid, and addressed to the appropriate representative as specified in this Agreement.
6.0 INDEMNIFICATION
6.1 NMUSD Obligations NMUSD agrees to defend, indemnify, and hold harmless City, its elected and appointed officials, officers, agents, employees, and volunteers from and against any and all losses, claims, actions, damages, expenses or liabilities, including reasonable attorneys' fe es, arising out of or in any way connected with NMUSD’s negligent performance of this Agreement. NMUSD assumes workers' compensation liability for injury or death of its officers, agents, employees, and volunteers, and, except as provided herein, assumes n o workers' compensation responsibility for the elected and appointed officials, officers, and employees of the City.
6.2 City Obligations City agrees to defend, indemnify, and hold harmless NMUSD, its officers, agents, employees, and volunteers harmless against and from any and all losses, claims, actions, damages, expenses or liabilities, including reasonable attorneys' fees, arising out of or in any way connected with City's negligent performance of this Agreement. Except as pro vided herein, City assumes workers' compensation liability for injury or death of its elected and appointed officials, officers, and employees, and assumes no workers' compensation responsibility for the officers, agents, employees, and volunteers of NMUSD.
7.0 ASSIGNMENT
This Agreement may not be assigned or transferred by either Party without the express written consent of the other Party.
8.0 NOTICE/ REPRESENTATIVES
422
8 The City and NMUSD have designated the following representatives to receive notices and act on their agency's behalf in the administration of this Agreement.
CITY: Parks and Community Services Director
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
DISTRICT: Assistant Superintendent of Secondary Education 2985 Bear Street
Costa Mesa, CA 92627
9.0 NO THIRD PARTY BENEFICIARIES
This Agreement, including, but not limited to, the indemnification provisions, is for the benefit of the Parties only and does not create, nor is it intended to create any benefit or liability to third parties.
10.0 ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement.
11.0 ATTORNEYS' FEES
In the event that litigation is brought by any Party in connection with this Agreement, the prevailing Party shall be entitled to recover from the opposing Party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing Party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof.
12.0 GOVERNING LAW
This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California.
13.0 AMENDMENTS
423
9 Only in writing executed by the parties hereto or their respective successors and assigns may amend this Agreement.
14.0 COUNTERPARTS
This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement.
IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by and through their respective authorized officers, as of the date first written above.
CITY OF COSTA MESA:
By: ____________________________ Date:______________________ Mayor
By: ______________________________ Date: _________________________ City Manager
NEWPORT MESA UNIFED SCHOOL DISTRICT (NMUSD):
By: ______________________________ Date: __________________________ Kerrie Torres, Assistant Superintendent
Secondary Education
ATTEST:
_________________________________ Date: __________________________ City Clerk
City of Costa Mesa
424
10 CITY: APPROVED AS TO FORM: CITY: APPROVED AS TO CONTENT:
________________________________ ___________________________ City Attorney Parks and Community Services Director City of Costa Mesa City of Costa Mesa
NMUSD: APPROVED AS TO FORM:
________________________________ Date: ____________________________ Kerrie Torres, Assistant Superintendent
Secondary Education
425
CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #: 23-1271 Meeting Date: 6/20/2023
TITLE:
COMPENSATION PLAN AND SALARY SCHEDULE REVISIONS FOR DESIGNATED
CLASSIFICATIONS REPRESENTED BY THE COSTA MESA CITY EMPLOYEES ASSOCIATION
AND THE COSTA MESA DIVISION MANAGERS ASSOCIATION
DEPARTMENT: CITY MANAGER’S OFFICE - HUMAN RESOURCES DIVISION PRESENTED BY: KASAMA LEE, HUMAN RESOURCES MANAGER
CONTACT INFORMATION: KASAMA LEE, HUMAN RESOURCES MANAGER, (714) 754- 5169
RECOMMENDATION:
Staff recommends the City Council:
1. Adopt Resolution Number 2023-XX revising the pay ranges for designated classifications represented by the Costa Mesa City Employees Association.
2. Adopt Resolution Number 2023-XX revising the pay ranges for designated classifications represented by the Costa Mesa Division Managers Association.
BACKGROUND:
The Costa Mesa City Employees Association (CMCEA) MOU with the City contains a provision for CMCEA to request up to five compensation inequity studies to be conducted by Human Resources each year. This MOU provision allows for at least five positions in this particular bargaining group to be analyzed by Human Resources to identify whether there is a discrepancy in that position’s compensation relative to the prevailing market.
ANALYSIS:
For the 2022 year (i.e. last year), CMCEA requested the review of the Maintenance Supervisor classification. As part of this review, the Human Resources Division also included a review of the Maintenance Superintendent and Maintenance Services Manager to address compaction and internal alignment.
The market analysis includes an analysis of the average total compensation of comparable classifications in the five cities that border the City of Costa Mesa, as per the City’sstandard practice.
These cities include the cities of Fountain Valley, Huntington Beach, Irvine, Santa Ana and Newport Beach. The total compensation for each classification includes: the classifications’base salary, PERS retirement benefit formulas, employee retirement contributions, and City contribution(s) to medical and dental plans or cafeteria plans. This framework is similar to the framework that has