ENGINEERING, PLANNING,

ENVIRONMENTAL, ARCHITECTURAL,

AND RELATED SUPPORT SERVICES
(RFQ NO. 2022-01) - QUALIFICATIONS
Prepared for: City of Crescent City Public Works Department March 18, 2022
City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 1
B Cover Letter
2020 L. Street
Suite 400
Sacramento, CA 95811
t 916 414 5800
f 916 414 5850
www.aecom.com
March 18, 2022
City of Crescent City
Public Works Department
Attn: Jon Olson and Andrew Leighton
Submitted via email per the City of Crescent City’s Citizen Portal instructions RE: Engineering, Planning, Environmental, Architectural & Related Support Services | RFQ No. 2022-01 Dear Members of the Selection Committee:

The City of Crescent City has done a great job of
promoting a high-quality of leadership, services, and life to your residents, businesses, and visitors by providing the most efficient, innovative and economically sound
municipal services, based on our diverse history, culture, and unique natural resources. For this on-call contract, AECOM Technical Services, Inc. (AECOM) assembled
a team civil engineering, architecture, environmental,
and planning professionals that have provided on-call
consulting services to many local agencies throughout
California.

Project Manager Howard Michael will lead the team. We
selected Howard because of his experience delivering
public agency infrastructure projects for the City of
Crescent City and Caltrans District 1 dating back to the early 1990s when he modeled the City’s entire water
distribution system and designed several miles of water transmission mains, pump stations, and water tanks. His local experience also includes a roadway improvement project on the City’s Front Street and other highway projects for Caltrans. Howard is a hands-on project manager and will be your primary point of contact, direct the team, assign appropriate staff as task orders are assigned, and will see that all work will be completed to the CIty’s satisfaction.

Howard is supported by a deep pool of resources that are available and can be at your office in a Day. Our key personnel include Bruce Farrell (Architecture) who has 41 years of experience and a vast background in commercial building, industrial, office, and other facility projects. Steve Noll of Design Workshop (Landscape/Planning) has a successful record of creating inviting public spaces and helping clients navigate complex permitting and implementation processes. Matt Korve (Civil Quality, Cost Estimates, Bike and Pedestrian) specializes in transportation planning, and multi-use trail, roadway, roundabout, and freeway design. Toni Horst (Grant Writing) has helped public agencies secure federal and state funds from a variety of sources. Petra Unger (Environmental) has extensive Caltrans and California local assistance environmental experience for a variety of public agency infrastructure projects. We also included James Barnts, former City Engineer on our team as our local representative to address any immediate needs.

Thank you for your time and review of our qualifications. If you have any questions or need additional information, please reach out to Howard Michael.

Regards,
AECOM Technical Services, Inc.

Mark AIkawa, PE Howard Michael, PE
Vice President Project Manager and Associate Vice President 510 874 3034 916 769 6334
[email protected] [email protected]

RFQ REQUIREMENTS
Service Areas of Interest: Civil Engineering,
Architecture, Environmental, Planning, and Other General Professional Services
Specific Services of Interest: AutoCAD, C3D (2017 or later), general design, project management, bidding construction support, drafting and design, shop drawing review,
permitting, field investigations, reports, grant writing, professional / non-professional services, regulatory
compliance, general planning, craft planning, analyses, and staff augmentation
Specific Services Excluded: Land surveying, rapid building inspections, potholing
Contact Information: Howard Michael, PE (CA
#52588), Associate Vice President Ӏ 2020 L Street,
Suite 400, Sacramento, CA 95811 Ӏ t: 916 769 6334
Authority: Principal-in-Charge Mark Aikawa is
authorized to obligate AECOM to perform the
commitments contained in the Statement
City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 2

INTRODUCTION TO AECOM
AECOM is a leader in providing on-call professional
services to state, associated governments / commissions / authorities, and county and city agencies. Our project experience includes, management, architecture,
engineering design, planning and analysis, highways and streets, water and wastewater, structural, geotechnical, traffic, and environmental consulting services.

At AECOM, we focus on the logistics of managing the
team so our clients can focus on their objectives for each project. We bring a strategic interdisciplinary approach to project delivery that provides benefits to all involved, including environmental advocates, functional specialists, community members, city staff, and taxpayers.

We have added Design Workshop on our team who
brings a successful record of integrating landscape
architecture, urban design, planning and strategic services on public agency projects. Whether designing a restorative private garden, developing the vision for a contemporary park or reimagining an under-performing downtown center, Design Workshop goes beyond the project itself to create places of timeless beauty and meaningful connections.

Design Workshop has worked with all levels of federal,
state, regional, and local government agencies and private clients providing on call services similar to those required for this RFQ. Based upon the type of services needed, the project schedule and funding available, we will work closely with the City to provide the staff and expertise best suited to fulfill the tasks.

CIVIL ENGINEERING
AECOM has extensive experience delivering a wide range
of public works projects. These include new roadways;
roadway widening and overlay; pavement resurfacing;
sidewalks; stormwater systems and facilities and post
construction storm water quality features; traffic signals; bike and trail facilities; structure facilities in compliance with City Standards, Caltrans Design and Construction
Standards and Procedures, and Local Assistance
Program and Procedures; design study reports; utility
coordination; traffic analyses; geotechnical engineering; preliminary and final PS&E; bidding support; and design services during construction.

Some of our local experience includes Caltrans District 01 A&E On-Call Design Engineering Services
involving storm damage restoration of 19 repair sites and preparation of 31 disposal sites in Del Norte and other nearby counties. This Contract was managed by Project
Manager, Howard Michael. Front Street Revitalization
which was managed by our Project Manager, Howard
Michael for this on-call contract with delivery support from Steve Noll of Design Workshop.

ENVIRONMENTAL DOCUMENTATION + PERMITTING
AECOM has extensive experience preparing
environmental studies and documents in compliance
with the Caltrans Standard Environmental Reference and
Local Assistance Procedures Manual. Our environmental
team includes environmental planners, a wide variety
of technical specialists, geographic information system (GIS) specialists, and other support staff. Our in-house staff has expertise in the following areas: environmental analysis and CEQA/NEPA documentation; biological
resources surveys/impact assessments; wetland/
regulatory services; endangered Species Act/California
Endangered Species Act (ESA/CESA) compliance; habitat
restoration/mitigation/conservation planning; cultural
resource surveys, impact assessments, mitigation, and
Native American consultation; transportation planning; air quality and greenhouse gas emissions studies; noise and vibration studies; water quality and water supply studies; land use planning; environmental/initial site assessments; visual resources, aesthetics, and visual/photo simulations; GIS mapping and analysis; environmental compliance
monitoring; and public outreach and interagency
coordination.

GRANT WRITING / FUNDING
AECOM’s National Infrastructure Economics practice is
based in California. Our funding strategists have secured millions of dollars of funding over the past 10 years for our clients on transportation projects. We have deep
experience in the delivery of full turnkey applications for clients in which AECOM acts as project coordinator, authors the application, and undertakes the required
analytics and economic evaluation. The output delivered to the client is a designed application tailored to and aligned with the sought-after outcomes of the specific
discretionary grant program.

Our team is also well-versed in winning and administering Caltrans Planning Grants, as well as finding other sources of funding — from regional COGs and TIGER, for example
— for our municipal clients. One example is for the City

FIRM INFORMATION
AECOM Technical Services, Inc. (AECOM) is a wholly
owned indirect subsidiary of AECOM, a Delaware
corporation whose stock is publicly traded on the New
York Stock Exchange (ACM/NYSE).

Type of Organization: Corporation
Year Founded (Predecessor Firm): 1927
Present Corporation: 1970
# of Employees in California: 3,600+
# of Employees: 48,750
Location where work will be performed: Sacramento
C Organization of Firm
City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 3
of Live Oak, where we’ve been successful in securing
$10 million from the U.S. Department of Transportation’s TIGER grant program for the construction of the
streetscape project on State Route 99, after helping
the city obtain an $810,000 grant from the SACOG
for engineering design for the same project. AECOM
also recently secured $248,000 for Stanislaus County
from Caltrans to fund the Crows Landing Corridor
Feasibility Study and $30 million in TCEP funding for
the construction of the Atwater-Merced Expressway.

And for the Solano Interstate 80 Managed Lanes
Project, AECOM secured $123 million in TCEP funding
for the construction. Through out the nation, AECOM
economists and funding strategists have secured over
$1.5B in the past 10 years for our clients.

ARCHITECTURE
AECOM provides a comprehensive approach grounded
in our expertise in each aspect of the project life cycle.

As planners, environmental consultants, designers,
architects, engineers, and program managers, we
knowledgeably lead complex, larger teams to execute the scope of work in an integrated manner.

With more than 150 million square feet of experience
encompassing every US metropolitan area, we bring
specific expertise in the planning, programming, and
design of buildings. Our team has detailed knowledge
of land use and planning and government processes as
well as the comprehensive technical engineering and
environmental experience that is expected in responsible and sustainable development.

Our professional architects and engineers, design
buildings and its systems with future needs in mind. We understand the regulatory, environment, and economic
drivers behind a project and design adaptable solutions towards a sustainable future. Our design approach is
inclusive. We always consider the environmental impact
of a new development or refurbishment on its immediate
surroundings. With a culture of dynamic creativity running through the company, we strive to provide innovative
solutions that work.

TRANSPORTATION PLANNING
AECOM has broad geographic and technical expertise
in the fields of transportation, land-use, master, and
transit operations and environmental planning, as well
as travel demand modeling and public involvement.

We understand the importance of providing thoroughly
comprehensive planning studies. We understand that
each study, regardless of size, is an opportunity to
strengthen the City’s urban fabric. Our staff is skilled at framing localized neighborhood projects in light of the City’s stated goals and visions. We pride ourselves in
taking a holistic approach to planning and engage our
engineers in all planning activities to ensure planning ideas can be built. This allows our clients to identify potential issues early.

Border Coast Regional Airport
Architectural / Engineering Design and
Construction Support
Crescent City Water System
Improvements
AECOM provided civil engineering and architectural
design services to develop and construct a new
terminal. Work included environmental analyses,
geotechnical analyses, financial analyses, coordination of design and funding with FAA, site planning, civil
engineering, building design, baggage conveyors, and
security systems engineering. Terminal site planning
was complicated by close proximity to wetland areas.

Preservation of these areas was a paramount goal of the project, and our solution carefully located the terminal to avoid disruption of the wetlands
AECOM studied and provided design services for
40,900 feet of 24-inch diameter water transmission
main to provide additional domestic water. AECOM
performed a hydraulic network analysis and the model
incorporated multiple storage facilities, including an
elevated reservoir in line with the transmission main
and two reservoir sites located within the distribution network. The analysis identified the system conditions
that had to be monitored, the areas that required control features, and the facilities that needed modifications.

AECOM designed modifications to the Washington
Boulevard reservoir site and pump station to increase
horsepower and a 4-mg steel reservoir.

City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 4
D Related Work Experience and Qualifications

INTRODUCTION
In 2016, the City of Crescent City (City) developed a
Strategic Plan premised on the City’s mission “Promote
a high quality of leadership, services, and life to our residents, businesses, and visitors by providing the most efficient, innovative and economically sound municipal
services, based on our diverse history, culture, and unique natural resources.”
The City owns and operates many facilities, which include a wastewater treatment plant, sewer collection facilities, water distribution facilities including water tanks, elevated water tanks and water pumps, a public swimming pool, fire station, police station, Housing Authority, a Public Works service yard, parks and recreation facilities, street infrastructure, and an administrative office facility. As part to the City’s municipal services, the City’s Public Works Department
(Public Works) is in part responsible for implementing the goals of the Strategic Plan.

To achieve your gals of Support Quality Services,
Community Safety, and Health to Enhance the Quality
of Life and Experience of our Residents and Visitors, the City successfully lobbied and passed Measure S for a
1% sales tax increase in 2020, increasing from 7.5% to

8.5% through 2022, when it will reduce to 8.25% in 2022 once the tax benefits the Del Norte County Fairgrounds.

The sales tax increase will generate $1.3 million annually.

Over the next 5 years, the city plans to spend $1,646,885 of Measure S funds on the Police Department needs,
$1,238,450 on Crescent City Fire Department needs,
$1,755,000 on street improvements, and $1,802,000 on
Fred Endert Municipal Pool maintenance. And a reserve
fund which would set aside 25% of Measure S revenues
annually for a rainy day.

Public Works is comprised Engineering, Field Operations, Fleet Management, Building, Electrical Maintenance, and Water Quality Lab divisions. Public works maintains 23
miles of roads and 5 downtown parking lots; 400 city
blocks with 1600 ADA ramps; 83,000 linear feet of storm drain pipe with 380 inlets; 60 miles of water line with 4,500 water connections, 2,300 valves and 492 Hydrants; 51
miles of sewer line with 3,850 sewer connections and 21 lift stations; 820 Streetlights; and 70 Acres of park land with 7 public restrooms.

At AECOM, we exist to Deliver a Better World. But we
don’t do that alone. We partner with municipalities like the City to understand their vision, the goals to deliver on that vision, and as a teaming partner, we Deliver a Better City through collaborative project delivery. We will benefit the City for these on-call services from our multidisciplinary infrastructure consulting services offering. As a global leader in infrastructure consulting, AECOM can respond
to any service need that Public Works requires. AECOM
has been delivering for municipalities – large and small – for over 100 years. We are a full-service firm offering the City resources in Engineering, Planning, Environmental, Architecture and Related Support Services.

UNDERSTANDING OF UPCOMING DESIGN WORK
We can support the City’s divisions on any project, from fleet management services to converting the City’s fleet to electric vehicles, to implementing areas of the City’s ADA transition plan, safety improvements identified in the Final Regional Systemic Safety Analysis Report, dated June 25, 2019, water or sewer facilities improvements, and street lighting or signal improvements. Projects identified in your RTP include:

Bike and pedestrian facilities: Our team brings extensive, recent experience delivering bicycle and pedestrian
facilities. Although the completion of the California
Coastal Trail through the city was accomplished with the Sunset Circle segment, the Del Norte County Regional
Transportation Plan (RTP), dated March 2021 identifies
the need for multi-use path along Front Street between
A Street and N Street. Project Manager Howard Michael
led the design efforts for the Font Street Revitalization and is passionate about supporting the City to fully
implement that design on Front Street and any associated services with the Beachfront Park. Recently, the Council did authorize funding for the next phase of Front Street development between G and I Streets which includes the
meander and landscape areas.

Sidewalk improvements: To close gaps, like Glen Street
from Small Ave. to Hamilton Ave, pedestrian improvements in cooperation with Caltrans, and even along US 101
through the County Harbor District urban area. Other
recommended improvements include the implementation
of advisory bike lanes where feasible. AECOM offers
alternative transportation planning and engineering
services for other elements of the City’s bikeway,
pedestrian, and park facilities.

City Gateway: At the north and south entrances to the City.

We have include Design Workshop as our subconsultant
to provide Gateway planning efforts that AECOM would the support with civil engineering efforts as needed.

Beachfront Park improvements: On June 5, 2018, voters
passed Proposition 68, a $4 billion “Parks, Environment, and Water Bond Act of 2018” of which the City has
secured $5 million dollars for a coastal bike pump track; an ADA renovated and expanded Kidtown; a cultural
and interpretive education piece on the Tolowa history
and people; and a one-mile exercise and interpretive
loop through the park! Together, AECOM and Design
Workshop can support the City on this project as may be implemented through this on-call contract.

City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 5
City Hall Renovation: The City recently purchased the
old Bank of America property on the corner of H Street
and Second Streets with the intent to move renovate the bank and move City Hall into this building. Our architects, structural engineers, and construction managers who are well versed in converting properties for civic use.

Pavement Improvements: The City’s average pavement
condition index (PCI) is 6.25. AECOM employs geotechnical engineers and pavement specialists to tailor pavement
replacement or rehab strategies to help the City manage this critical asset to prolong the pavement life and manage the City’s financial exposure through effective asset
management strategies.

UNDERSTANDING OF THE CITY’S

REGULATORY COMPLIANCE PROGRAM
AECOM is familiar with environmental review and permitting processes for municipal public works projects and has
performed and coordinated work to meet NEPA and CEQA
requirements and provide permitting strategies, application preparation, mitigation planning, and consultation with regulatory agencies. We have in-house staff that can
perform all of the technical studies typically required for public works projects from biological and cultural resources to air quality/GHG and noise study reports and water
quality, hydrology, and hazards, as well as environmental planners and project managers to prepare environmental
documents and guide the City through CEQA/NEPA and
permitting processes.

AECOM can assist the City in obtaining the necessary state and federal environmental permits for its projects. Typical examples include US Fish and Wildlife Service and National Marine Fisheries Service Biological Opinions, California Department of Fish and Wildlife Streambed Alteration
Agreement, California Department of Fish and Wildlife
Section 2081 Incidental Take Permit, US Army Corps of
Engineers Nationwide or Individual Permits for wetland
impacts, North Coast Regional Water Quality Control
Board 401 water quality certification or waste discharge requirements, and Local Coastal Commission approvals.

We can also prepare archaeological resource treatment
and design plans or unanticipated discovery plans for
Section 106 of the National Historic Preservation Act
compliance. We can also assist the City with contacting and consulting with local tribal representatives.

UNDERSTANDING OF A TYPICAL PLANNING

PROCESS
The City Planning Division provides professional guidance and technical assistance to the City Council, planning
commissions and the public; implements and monitors
city growth and development policies; accepts, processes and analyzes development applications and recommends
action on such applications to the Council, Planning
Commission and Design Committee. The Planning Division
also acts on items such as administrative permits, sign permits, home occupations and code enforcement.

AECOM can support the City Planning Division as follows:

Urban Planning
We have included Design Workshop on our team who has
the skills and experience to provide planning expertise.

They are well versed on processes and procedures for a
wide range of planning related activities including general plan updates, form-based codes, land use planning, master plans, design guidelines, development standards and vison plans. Design Workshop has staff that are AICP certified and can assist with a variety of planning related activities to support City staff in reviewing plans and projects submitted to the city, as well as updating documents and procedures that may be required. They also have public outreach and engagement experts in-house if needed.

Transportation Planning/Funding Acquisition
AECOM’s transportation expertise in Northern California spans more than 100 years and includes developing
comprehensive transportation projects from concept
through operations, as well as planning, engineering, and project management services for cities, counties and
transit agencies. We have successfully integrated planning, urban design, economics, transportation planning and
engineering, and environmental management in one firm, to provide the right resources for each task.

We work with local communities to inform plans that are technically sound, feasible to implement, and support the projects and surrounding community’s context and vision.

Recent AECOM projects such as the Yuba-Sutter Transit
Corridor Enhancement Plan for Yuba and Sutter Counties, and the Lake Transit Authority Bus Passenger Plan for
the Lake Area Planning Council, demonstrate success in
applying strong planning/design approaches and extensive public outreach to project areas that required multiple solutions for diverse transportation and land-use needs.

While our core values include planning for healthy,
equitable, and resilient neighborhoods and cities that
are connected effectively and efficiently with reliable transportation networks, recent events have brought
greater focus to the challenges communities face, and
accelerated the pace at which we must act. We are
committed to advancing this work through prioritizing
equity, diversity, and inclusion within our culture and company and in the way we evaluate, design, and deliver projects in the communities we serve.

Environmental Planning
AECOM will help the City identify the appropriate CEQA, and if necessary, NEPA documentation. AECOM will review the proposed project against the State CEQA Guidelines Article 18 and Article 19 and against 23 CFR 771.117(c) and (d) to determine if the project might be eligible for a Statutory or Categorical Exemption under CEQA and a Categorical
Exclusion under NEPA. If so, AECOM will complete the CE City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 6
form for the City or the Caltrans CE/CE form for review and comment first by the City and then by Caltrans.

There may be instances, when technical memoranda
or studies are warranted to provide evidence of the
magnitude and intensity of an impact. Based on
consultations with the City (and if funding, Caltrans), AECOM will prepare the requisite studies to advance the delivery of the City’s projects.

SIMILAR PROJECT EXPERIENCE
AECOM has long history of successfully providing on-call services to many satisfied local agencies in Northern
California. Our team is experienced in the design of
sidewalks, bicycle facilities, intersection and roadway drainage improvements, roadway reconstruction,
streetscapes, and bridge replacements; environmental
studies and documents in compliance with the Caltrans
Standard Environmental Reference and Local Assistance
Procedures Manual; and transportation planning.

Caltrans District 4, San Francisco Bay Area, CA
On-Call Civil Engineering, Planning, and Environmental
Services
AECOM is a long-term partner of Caltrans District 4,
supporting the delivery of projects from the PID phase
through construction, from the SHOPP program to major
capital improvement projects since 2000. We have
developed productive working relationships with Caltrans staff across all departments and levels of the organization that help us understand how to work collaboratively and effectively with District staff. Over the last 20 years, we have held numerous engineering design and environmental services contracts supporting hundreds of projects
from PID, PA&ED, PS&E, Construction Support, and
Environmental Services. Performance: task orders were
completed on schedule and within budget.

South Main Street Complete Streets & Angels
Camp, Calaveras County, CA
Civil Engineering and Planning Services
This project improves pedestrian accessibility by
installing and upgrading curb ramps, sidewalks, and
driveways to current Americans with Disabilities Act
(ADA) standards and to incorporate Complete Streets
elements to improve pedestrian mobility and accessibility along SR 49 between Pine Street and Brunner Hill Road,
in Angels Camp. AECOM was responsible for performing
preliminary engineering studies and preparing project
report. The work included reviewing the project scope,
geometry, and cost estimates; performing engineering
studies; traffic forecasting/modeling; hydraulics and
hydrology studies; planting design concepts; utility
locations; and traffic studies. Performance: this project is currently on schedule and is expected to be completed on budget.

Caltrans District 4 Planning On-Call, San Mateo
County, CA
Civil Engineering and Planning Services
As part of our on-call contract, AECOM provided planning services for a variety of rehabilitation and preservation projects. The work included various pavement
preservation designs to reduce deterioration on US
101 mainline and ramps as well as concrete barriers,
guardrails, curb ramps, and drainage systems; and
improve ride quality from PM 0.0 to 16.5. On US-101 in
San Mateo County from PM 0.0 to 21.8. AECOM is also
accommodating a ramp metering project that requires
ramp shoulder widening for a California Highway Patrol
enforcement area and widened a single lane on-ramp
to two lanes for ramp metering at another location. This additional lane along a portion of the northbound onramp accommodates ramp metering. Because the project limits are within the Managed Lane Project, AECOM is
coordinating closely with the designer and the scope and cost estimates in the Project Initiation Document reflect an assumption that the project could be combined with
the SLC/SM-101 Managed Lane Project and constructed
as one project. Performance: task orders were
completed on schedule and within budget.

Front Street Revitalization, Crescent City, CA
Civil Engineering Services
Located just off the Harbor in Crescent City, California, Front Street is a gateway into a community rich with
history and culture. Howard Michael of AECOM was
PM with another firm and supported by Steve Noll of
Design Workshop to redevelop this corridor to promote
opportunities for pedestrian and bicycle travel, as well as creating a sense of central space or village atmosphere where people could meet, socialize, and eat. The design reduced the paved width of the roadway for safer
pedestrian crossings and enhancing the character of
Front Street with a gently meandering alignment that
included diagonal on-street parking. A roundabout was
added at B Street to denote the westerly terminus with
way finding iconic features providing direction to the
City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 7
harbor pier, the lighthouse and the rocky northern coast.

A model and photo simulation was created and presented
at a public meeting. The images provided a clear vision for how the beach front commercial and residential areas could be enhanced to attract visitors. Performance:
project was completed on schedule and within budget.

San Mateo County Regional Operations Center,
Redwood City, CA
Architectural Services
This 37,000-square-foot building houses the County’s
mission-critical emergency operations. Located at
the northern edge of historic Redwood City, it is a
contemporary civic addition to the County center that
celebrates the critical and heroic function provided by the facility and its dispatchers. The Regional Operations Center (ROC) provides flexible, non-secure training
spaces, welcomes visitors during public events,
and functions efficiently with great resiliency during
emergency situations. The design for the ROC facility
reflects careful research and an understanding of the
site’s history, surrounding context, bridging documents findings, County and City planning documents, and urban design plans. Performance: the project was completed on schedule and within budget.

Ames Research Center, Moffett Field, CA
Architectural Services
AECOM completed multiple projects for this 220-
acre, 8.8 million square-foot campus, at which we have
provided on-site A-E services since 1995. For the utility engineering services contract, AECOM partnered with
Pacific Gas & Electric through its utility energy services contract to develop a comprehensive energy efficiency
program. Our integrated technical approach delivered a
financially viable project that also greatly improved the reliability of mission critical systems. When numerous
underground natural gas lines were discovered to be
abandoned, AECOM employed an innovative and costeffective horizontal drilling technique to install new underground lines. This approach allowed us to convert
older, steam-heated buildings to natural gas on budget
and without disrupting vehicular and pedestrian traffic.

Traditional methods are costly and require trenching,
installing new lines and repaving. Performance: projects are currently on schedule and are expected to be
completed on budget.

Monterey Salinas Transit Bus Operations Facility,
Monterey, CA
Architectural Services
The 33,000 SF facility houses new services bays,
including new tire-servicing station, fuel and driver
support facilities, larger parts storage, electric bus
charging station, and communications center. AECOM
worked with the District to develop the building program, worked with the lead designer to lay out the plan and
elevations, developed the full list of new and reused
maintenance wash equipment, and coordinated the
multidisciplinary team in producing the final construction documents. Performance: the project was completed on
schedule and within budget.

On-Call Environmental and Biological Support
Services for Transportation Improvements,
Northern California
Environmental Services
Since 2002, AECOM has provided on-call general
environmental services for Caltrans North Region
Districts 1, 2, and 3. More than 100 task orders have been issued. Assignments have included studies for projects
in 15 Northern California counties, including Del Norte, Humboldt, Mendocino, and Lake. Performance: task
orders are currently on schedule and are expected to be completed on budget.

On-call Environmental Services, Sacramento, El
Dorado, Yolo, Solano, and Placer Counties, CA
Environmental Services
AECOM is providing environmental services to support
the construction, repairs, and/or monitoring of various SMUD projects and facilities, such as transmission lines, substations, wind generation, gas pipeline projects,
the Headquarters Renovation Project, and one project
for the UARP. Services include the full range of CEQA
and NEPA compliance documents and supporting
technical such as biological and cultural resources, air quality, traffic, hazardous materials, and water quality, as well as permitting, construction monitoring, and longterm monitoring of compliance with permit conditions.

Performance: projects are currently on schedule and are expected to be completed on budget.

San Joaquin Regional Rail Commission Program
TIRCP and RAISE Grant Applications, San Joaquin
County, CA
Grant Writing Services
Since 2016, AECOM has helped SJRRC secure more than
$1 billion dollars of state and federal grant monies from both federal and state grant programs. AECOM recently
outlined a program of additional needs for the ACE
and San Joaquins systems totaling over $1 billion. The
program includes 5 ACE trains a day into San Jose, 3 ACE trains a day into Union City, and 12 San Joaquins trains a day timed with HSR in Merced into Sacramento and
Oakland. Performance: projects have been completed on
schedule and within budget.

City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 8
E Staffing and Support
Project Advisor / Local Liaison
James Barnts, PE
Project Manager
Howard Michael, PE
Principal in Charge / Quality Assurance
Mark Aikawa, PE
Quality Control
Civil - Matt Korve, PE
Architecture - John Vezirian, RA
Planning - Matthew Gerken
Environmental - Lynn McIntyre
Architecture
Bruce Farrell, RA
Facilities
John Vezirian, RA
Bill Goryl
Quin Wu
Ruohan Wang
Sharon Peng
Structural Engineering
David Hollinger, PE, SE
Malcolm (Andy) Carter, PE, SE
Vincenzo Melchiorre, PE
Landscape
Steve Noll, PLA, AICP (DW)
George Strnad, RLA, RA
Nathan Pepple, RLA
Mechanical(M), Electrical
(E), Plumbing (P)
Shane Russell, PE, LEED AP
(M,P)
Shabad Khalsa, PE (E)
Ray Benjamin, PE (E)
Karinne Mayor (P)
Civil
Howard Michael, PE
Civil/Construction Support
Vanessa Doctolero, PE
Clara Ponce, PE
Sean Jaime, PE
Cindy Jimenez
Traffi c Signals / Lighting
Aswini Rajagopalan, PE
Kevin Wong, PE
Water Quality & Drainage
Study/Design
Matt Korve, PE
Jimmy Medellin, PE
Tom Sweet, PE , LEED AP
Sergio Aviles
Cost Estimates
Clara Ponce, PE
Utility Coordination
Sang Kim, PE
Bridge Design
Jan Hueser, PE
Orin Brown, PE
Jean Freking, PE
Keith Lee, PE
Specifi cations
Maria Sedghi, PE
David Harnagel, PE
Constructability Review
Elie Abi-Jaoude, PE
Amer Bata, PE
CAD
Vanessa Doctolero, PE
Sergio Aviles
Bike and Pedestrian
Matt Korve, PE
Vanessa Doctolero, PE
Planning
Urban
Steve Noll, PLA, AICP (DW)
Transportation
Jordan Karp
Environmental
Petra Unger
Biological Resources/
Environmental Permits
Saana Deichsel
Petra Unger
Cultural Resources
Kathleen Kubal, RPA
Greenhouse Gas + Air
Quality
Paola Pena
Noise Vibration
Mohammad Issa Mahmodi
Visual Assessment
Andrew Jones
Architectural History
Chandra Miller
General Professional
Grant Writing
Toni Horst, PhD
Lisa Reynolds
Lincoln James
Srividya Gopalan
Geotechnical
Paul Boddie, PE, GE
Rob Nixon, PE, GE
Juan Sorensen, PE, GE
Value Engineering
Tammy Dow
Design Support During
Construction
Engineering and architecture
design staff
Shop Drawing Review
Engineering and architecture
design staff
SWPPP
Joy Villafranca, PE, QSD/P
Water Wastewater Facilities
Craig Smith, PE, QSD/P
 Key Personnel
(DW) Design Workshop
This contract will be managed and work will be developed from our Sacramento Office. Project Manager Howard Michael will be responsible for the overall coordination of the contract, maintaining the effectiveness and efficiency of the work, coordinating cost and schedule reporting, and ensuring the City’s satisfaction. Howard will see that off-hour resources are available to the City if needed and we can be at your office in the event of an emergency in eight hours.

City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 9
As a recognized leader in civil engineering, environmental, planning, and architectural services, the AECOM team has worked with many state, cities, and local transportation agencies to improve the efficiency of transportation through superior planning and design. A brief summary of our key personnel’s experience is provided in the table below.

F Key Personnel
Name / Role
Yrs.

Exp.

Education /
License Relevant Experience
Howard Michael
Project Manager 41
BS, Civil
Engineering /
Professional
Civil Engineer,
CA
Howard has led every aspect of project delivery from planning to design, including management of multidisciplinary teams; development of PSRs and PRs with environmental documents; PS&Es; and construction engineering. Experience in rural and urban highway design/geometrics; interchanges; bridge design, replacement/rehabilitation; tunnel design; civil site and structural design of pump stations, operations buildings; water system; pipelines; and a variety building types.

Bruce Farrell, RA
Architecture Lead 41
BS,
Architecture
/ Registered
Architect, CA
Bruce leads AECOM’s Northern California architecture practice and has managed and designed a variety of infrastructure design and planning projects. His experience has included transit operations, maintenance and repair facilities, and industrial, office and commercial projects.

Steve Noll, PLA, AICP
Landscape / Planning 38
BA,
Landscape
Architecture /
Professional
Landscape
Architect
Steve specializes in developing awareness of the physical and social aspects important for “great” urban spaces. He has developed the respect and trust of public agencies while navigating his clients through the complex permitting and implementation process. In addition, Steve is involved with many community-based organizations where he provides guidance in areas of mixed-use planning, recreation and public access design and planning, community design, and main street
improvement plans.

Matt Korve
Civil Quality / Cost
Estimates / Bike &
Pedestrians
21 BS, Civil
Engineering /
Professional
Civil Engineer,
CA
Matt specializes in transportation planning, and multi-use trail, roadway, roundabout, and freeway design. He has prepared numerous comprehensive plans, specifications, and estimates (PS&E) packages, as well as project approval documents and planning studies for both State and local clients.

Toni Horst
Grant Writing 27
PhD, Regional
Science / BA
Economics &
Government
Toni has been prominent in thought leadership and coordinating with, advising, and teaching agency reviewers on the manner in which public infrastructure investment is assessed and awarded.

She has successfully helped clients analyze and develop grant applications and implementation strategies for numerous funded transportation projects.

Petra Unger
Environmental 30 MS, Botany
Petra is a senior environmental project manager with a
background in biological resources and extensive Caltrans and California local assistance transportation project experience.

She is thoroughly familiar with the format and requirements of environmental studies for transportation projects and the expectations of local municipalities, Caltrans, and resource agencies, having completed and managed dozens of NESs,
other technical studies, and environmental documents in compliance with the Caltrans Standard Environmental Reference and Local Assistance Procedures Manual.

City of Crescent City Engineering, Planning,
Environmental, Architectural & Related Support Services AECOM 10

AECOM REFERENCES

NASA AMES RESEARCH CENTER
David Rhodes, Project Manager
Nasa Ames Research Center
650.604.2922 | [email protected]

ON-CALL ENVIRONMENTAL SERVICES
Avè Brown, Environmental Division Manager
Contra Costa County Department of Public Works
925.313.2311 | [email protected]

ON-CALL ENGINEERING SERVICES
Allen Lao, Project Manager
Caltrans District 10
209.986.5570 | [email protected]

DESIGN WORKSHOP REFERENCES

VETERANS MEMORIAL BEACH PARK
Mark Cleveland, Senior Park Planner
Sonoma County Regional Parks
707.565.3349 | [email protected]

KINGS BEACH COMMERCIAL CORE
Dan LaPlante, Associate Engineer
Placer County
530.581.6231 | [email protected]

KINGS BEACH COMMERCIAL CORE
John Hitchcock, Planning Manager
City of South Lake Tahoe
530.542.7472 | [email protected]

PERSONNEL REFERENCES

HOAWRD MICHAEL
Matt Lampa, PE, Principal Civil Engineer
Capital SouthEast Connector JPA
916.876.9093 | [email protected]
Allen Lao, PE, Project Manager
Caltrans District 10
209.986.5570 | [email protected]
Jesus Avitia, PE, Special Projects Program Manager
Engineering Division-Special Projects, Public Works
Department
559.621.8804 | [email protected]

BRUCE FARRELL
Dan Leavitt, Manager of Regional Initiatives
SJRRC
209.944.6266 | [email protected]
Kevin Sanderson, Project Manager
BART
510.287.4819 | [email protected]
Carl Wulf, Facilities and Capital Improvements Manger
Monterey-Salinas Transit District
831.227.1432 | [email protected]

STEVE NOLL
Mark Cleveland, Senior Park Planner
Sonoma County Regional Parks
707.565.3349 | [email protected]
Dan LaPlante, Associate Engineer
Placer County
530.581.6231 | [email protected]
John Hitchcock, Planning Manager
City of South Lake Tahoe
530.542.7472 | [email protected]

TONI HORST
Dan Leavitt, Manager of Regional Initiatives
SJRRC
209.944.6266 | [email protected]
Dana Garcia, Project Development Manager
Northern District, New Mexico Department of
Transportation
505.231.7663 | [email protected]
Melanie Johnson, Senior Project Manager
Quandel Consultants
312.634.6200 | [email protected]

MATT KORVE
Matt Lampa, PE, Principal Civil Engineer
Capital SouthEast Connector JPA
916.876.9093 | [email protected]
Allen Lao, PE, Project Manager
Caltrans District 10
209.986.5570 | [email protected]
William Shunk, PE, Senior Engineer
City of Sacramento Department of Public Works Funding
and Project Development
916.808.2986 | [email protected]

PETRA UNGER
Jesse Robertson, Transportation Planning
Caltrans District 1
707.684.6879 | [email protected]
Amber Transou, Senior Environmental Scientist
California State Parks, North Coast Redwoods
707.445.6547 x14 | [email protected]
Jessica Carter, Director of Parks and Public Engagement Save The Red Woods
415.820.5878 | [email protected]
J References

REQUEST FOR

QUALIFICATIONS
City of Crescent City

RFQ Number 2022-001
to provide
Engineering, Planning,
Environmental, Architectural
& Related Support Services

March 18, 2022
Calpo Hom & Dong Architects
March 18, 2022
City of Crescent City
Public Works Department
377 J Street
Crescent City, California 95531
Attn: Jon Olson
Subject : Request for Qualifications : RFQ Number 2022-001 RFQ To Provide Engineering, Planning, Environmental, Architectural & Related Support Services
Mr. Olson and Members of the Review Committee :

Calpo Hom & Dong Architects (CH&D) is pleased to submit our Qualifications to the City of Crescent City.

Proposing Firm: Calpo Hom & Dong Architects
2120 20th Street, Suite One, Sacramento, CA 95818
Authorized Representative: Dennis Dong, Vice President
2120 20th Street, Suite One, Sacramento, CA 95818
530-305-9129 / [email protected]
Contact Person: Dennis Dong, C12.163
Calpo Hom & Dong Architects proposes to provide Architectural Services.

Calpo Hom & Dong Architects has received Addendum No. 1, dated March 9, 2022.

Calpo Hom & Dong Architects proposed services and prices are valid for 180 calendar days from the Statement due date and that the quoted prices are genuine and not the result of collusion or any other anti-competitive activity.

CH&D is very enthused about this unique request and it’s opportunities and challenges. CH&D is eager to work with the City of Crescent City in order to make this a successful project.

CH&D supports a unique combination of qualifications and expertise to this project. • Small Community Experience
CH&D has the experience of working with small communities, and understands their need to get the most out of their projects. CH&D is currently working on Public Safety Facility Projects Smith River (Fire Station), and recently completed work in Yreka (Police Facility) and in Willits (Fire Station).
• Previous Public Facilities Experience
CH&D has an extensive portfolio with Public Works Projects, Public Safety Projects, Civic Projects, Wastewater and Water Treatment Plant Projects, and Renovation Projects. • Del Norte County Experience
CH&D is currently working in Smith River, with the Smith River Fire Protection District, on the feasibility of their Fire Station No. 1 Project.

City of Crescent City – Request for Qualifications
RFQ Number 2022-001
March 18, 2022 - page 2
• Staff Commitment to this Project
CH&D will commit to this project Dennis Dong, AIA, CSI, as Principal-In-Charge and Project Manager, with day-to-day responsibilities for the project. Dennis has a wealth of experience in Public Facilities, is very hands-on, and has great interest in this project for the City of Crescent City. Dennis will be available for the entire duration of the project.
• Proven Record of Service with Public Agencies
CH&D is proud of our record of high quality services, as best demonstrated by the number of Public and Private Clients which have chosen to work with our firm repeatedly. CH&D is organized with strong management skills and technically trained staff to service these needs and clients. CH&D recognizes the need for All Projects to be completed on-time and in-budget, without sacrificing the design opportunities and qualities of the project.
• Enthusiastic Methodology
The Methodology of the CH&D Team is reflected in our Enthusiasm and Spirit for the Project, with the best possible solution to challenges as the End Goal of the Team.

Strong, participatory Management practices embody our Methodology, with all Members involved in spirited discussions.
• Technical Staff Capabilities
The CH&D Team provides comprehensive design services in Programming; Planning; Architecture, Interior Design, Structural Engineering, Mechanical Engineering, Electrical Engineering, Environmental Consulting, and Cost Estimating. Senior Staff, experienced in working with complex projects, will be involved in all areas of Project Management and Quality Assurance.
• Design Team Enthusiasm
As members of the Design Profession, CH&D is highly motivated and enthusiastic about working with the City of Crescent City, and the opportunities and challenges the City presents.

As Principal-In-charge, I will be personally be the managing partner for this project, and am authorized to enter any contracts on behalf of the firm. As the Project Architect for all of the projects mentioned in this proposal, I and the staff of Calpo Hom & Dong Architects look forward to the opportunity to further expound upon our qualifications and relationship with the City of Crescent City.

Sincerely,
Calpo Hom & Dong Architects
Dennis Dong, AIA, CSI
C. Organization of Firm
Firm Name Calpo Hom & Dong Architects
Business Address 2120 20th Street, Suite One
Sacramento, California 95818
Telephone Number 916.446.7741
916.236.4288 Fax
Principal Contact Person Dennis Dong (530.305.9129 cell) E-Mail Address [email protected]
Year Established 1984
Type of Organization California Corporation
Federal Tax ID 68-0022849
Calpo Hom & Dong Architects (CH&D) is a Sacramento-based Architectural, Interiors, and Planning Firm. Founded in 1984, CH&D is managed by five Principal Partners; Dennis Dong, AIA, CSI, Alan C. Hom, AIA, Loangle Newsome, AIA, Andy Kwong, AIA, and Karl Chan.

CH&D is headquartered at 2120 20th Street, Suite One, in Sacramento’s Midtown District.

CH&D offers the full range of Architectural Services, including Master Planning, Feasibility Studies, Design, Interior Design, Space Planning, Construction Administration, Historic Preservation, and Consulting Services. Our portfolio includes Public and Private development for Administrative and Support Facilities for Public and Private Agencies, Essential Services Buildings for Fire Departments and Law Enforcement Agencies, Community Buildings, Schools and Colleges, Commercial Office and Retail Buildings, Multi-Use Facilities, Industrial Projects, Renovation and Adaptive Reuse, and Multiple Housing.

As general practitioners of Architecture, CH&D has designed a widely diverse range of projects, each allowing a different viewpoint to Design Solutions. These different viewpoints, collectively, allow us to foresee a myriad of opportunities within each individual project.

CH&D sees this diversity as advantageous to the City of Crescent City Related Support Services RFQ , with its need to appeal to a variety of Users.

CH&D is best suited to assist the City with Architectural Design and Documentation for Public Projects. As will be displayed in Section D of this RFQ, CH&D has strong experience with Public projects, most notably Public Safety and Public Works. Our experience and knowledge Includes Police Stations, Fire Stations, Corporation Yards, Wastewater Treatment Support Buildings, as well as Civic Facilities, including City Halls and Administrative Offices.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
2 Project Management and Design Solutions start with the Project Team, specifically selected for each project. Calpo Hom & Dong Architects puts together a Team comprised of Architects and Engineers with a solid history of working together, allowing the Team to confidently proceed with the tasks of Solution-Forming. The Owner and the Users are important members of the Project Team, providing the input and feedback vital to the success of the Project.

Working collaboratively, this Team instinctively knows each other’s roles, as well as their own, within a given scope of work. CH&D will serve as the Team Leader in all projects.

CH&D staff is currently
16, with 8 registered
Architects, 3 Designers,
3 CAD Operators, and 2
Support Staff.

CH&D maintains a
workload of 75% of
capacity, leaving a 25%
margin of backup for
“instant” staffing on any
project due to a move-up
of a completion date or
additions to project
scope.

CH&D maintains an
Errors and Omissions
Insurance Policy in the
Amount of $2 million.

Our Insurance Carrier is
Dealey, Renton &
Associates; a complete
policy is available for
review upon request.

CH&D is a 100%
minority-owned firm,
certified by the State of
California (Certification
No. 843171) and the
CalTrans Office of Civil
Rights (Certification No.

CT-006166). CH&D is
a Small Business firm,
certified by the State of
California Department of
General Services
(Certification No.
0027716).

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
3 D. Related Work Experience & Qualifications
Calpo Hom & Dong Architects is best suited to work with and assist the City with the Architectural Design work for City projects. Our experience is very diversified with Public Safety and Public Works types of projects.

Law Enforcement Facilities Experience
Calpo Hom & Dong Architects is well-versed in the design of Law Enforcement Facilities, as well as combination Police/Fire Stations, with emphasis on Operational and Design Concepts.
• Roseville Police Facility
New Police Facility (+/-65,000 square feet, 1997), including Administration, Patrol, Investigations, Crime Analysis, Records, Property/Evidence Storage, Emergency Operations Center, Locker and Training Rooms, Dispatch Center, Communications Tower, Firing Range, Secure Parking, and a Type I Detention Facility with 12 Cells. • Lincoln Public Safety Facility
Planning and design of the incorporation of the Public Safety Department into an existing building (+/-75,000 square feet), master planned on a +/-26 acre site. Project to provide new Police Headquarters and a Fire Station, both programmed and designed for future expansion of the growing department. Police facility includes Administration, Patrol, Investigations, Crime Analysis, Records, Locker and Training Rooms, Dispatch, Booking, Property/Evidence Storage, and an Indoor Firing Range, Emergency Operations Room, and Break Room facilities. This facility was not constructed. • Winters Public Safety Facility
Planning and design of new Two-Story Joint Police (+/-10,413 square feet) and Fire (±18,141 square feet) Facility (+/-33,458 square feet total, 2008). Police Facility includes Administration, Patrol, Investigations, Crime Analysis, Records, Locker Rooms, Booking, Property/Evidence Storage, Emergency Operations Room, and Break Room facilities. • Firebaugh Public Safety Facility Detailed Space Requirements Report Planning and Programming for a new Joint Police and Fire Facility (+/-17,453 square feet total, 2009). Police Facility includes Patrol, Investigations, Records, Administration, Dispatch, Property and Evidence Storage Facilities, Vehicle Sallyport and Booking Area with Holding Cells, and Staff Locker Rooms. This project was a study and not constructed • California Highway Patrol Field and Dispatch Office - Bakersfield Planning and Design of new CHP Office Facility (+/-36,000 square feet, 2016), Vehicle Service Building (+/-6,500 square feet), and Secured/Volatile Equipment Building (+/- 1,000 square feet) , including Administration, Patrol, Records, Evidence Storage, Radio Communications, Communications Tower, Locker Rooms, Emergency Generation facilities, and Vehicle Maintenance and Fueling facilities. This project is Lease-Back Design-Build project with the State of California
• Yreka Police Facility - Yreka
Retrofit of an existing Commercial Building into new Police facilities (+/-10,000 sf, 2018). Facilities include Administrative Offices, Records, Dispatch, Patrol, Investigations, Evidence, and an EOC/Training Room. A new exterior Hall was added to improve the flow of internal circulation. Building was upgraded structurally to comply with the Essential Services Act. Site work includes Secured Parking, Dog Kennels, and a Carport shelter for Squad Cars.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
4 Fire Station Experience
Calpo Hom & Dong Architects has designed over twenty Fire Facilities throughout Northern California, with emphasis on Operational and Design Concepts, with recent experience in New Fire Stations, Remodels and Additions, Administrative Offices, Hose Towers, Training Towers and Facilities, and Pump Testing Facilities.
• El Dorado Hills Fire Station No. 85
New Administrative Headquarters Facility, ±25,000 sf; includes Apparatus Bays (4 x 2 vehicles deep), Living Quarters with accommodations for 11-Person Crew, and Batallion Chief, Training Room, Exercise Room, and District Administrative Offices.

The Design solution includes a Radiant Hear Concrete Slab in the Apparatus Room, and the Department’s trademark Hose Tower. This Station replaces the old Station 85, which had outgrown its effectiveness.
• Ceres Fire Station No. 1
New Administrative Headquarters Facility, ±15,000 sf; includes Apparatus Bays (3 x 2 vehicles deep plus one), Living Quarters with 8-Person Crew accommodations, Captain’s Quarters, Community Room, Exercise Room, Equipment Turnout Room, SCBA Facility, and District Administrative Offices. The Two-Story Design solution replaces the existing Fire Station, and enhances the streetscape for Downtown Ceres. • Lathrop-Manteca Fire Station No. 34
New Facility, ±10,000 sf; includes Apparatus Bays (2 x 2 vehicles deep), Living Quarters with 9-Person Crew accommodations, Offices, Community Room, Exercise Room, Equipment Turnout Room, and Firepole.
• Ceres Fire Station No. 3
Conversion of an Existing Facility, ±10,000 sf; includes Apparatus Bays (3 x 2 vehicles deep plus one), Living Quarters with 8-Person Crew accommodations, Captain’s Quarters, Training Room, Exercise Room, Equipment Turnout Room, and Office Area. The design solution is master-planned for a future Training Yard, expansion of Training Rooms, and Public Parking and Access. • Lincoln Fire Station No. 34
New Facility, ±13,500 sf; includes Apparatus Bays (3 x 2 vehicles deep plus one), Living Quarters with 10-Person Crew accommodations, Battalion Chief’s Quarters, Training Room, Exercise Room, Equipment Turnout Room, Office Area, and 40 foothigh Hose Drying Tower. The design solution includes a Drafting Pit, and is masterplanned for a future Training Yard. • West Sacramento Fire Station No. 45
New Two-Story Administrative HQ Facility, ±26,000 sf,; includes Apparatus Bays (4 x 2 vehicles deep), Administrative Offices, Living Quarters with 12-Person Crew accommodations, Captain’s and Duty Chief’s Quarters, Community/Training Room, Exercise Room, Equipment Turnout Areas, Decontamination Areas, and City Police Service Center.
• Folsom Fire Station No. 39
New Two-Story Facility, ±11,700 sf; includes Apparatus Bays (3 x 2 vehicles deep), Administrative Offices, Living Quarters with 6-Person Crew accommodations, Exercise Room, Turnout Areas, Decontamination Areas, and Fueling Area. • Winters Fire Station No. 26
New Two-Story Joint Police (+/-10,413 square feet) and Fire (±18,141 square feet) Facility (+/-33,458 square feet total). Fire Station includes Apparatus Bays (4 x 2 vehicles deep), Administrative Offices, Living Quarters with 12-Person Crew accommodations, Captain’s Quarters, Training/EOC Room, Exercise Room, Turnout Areas, Decontamination Areas, and Training Grounds, with Drafting Pit.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
5 Municipal Projects Experience
Calpo Hom & Dong Architects is well-versed in the design of Public Works Facilities, with emphasis on Operational and Design Concepts, with recent experience in Corporation Yards, Maintenance Facilities, Crew Rooms, and Civic Facilities.
• Roseville Corporation Yard
Planning and design of four major Facilities (+/-149,000 square feet), including Administration Building (+/-40,000 square feet), Central Stores (+/-32,500 square feet), Vehicle Maintenance Facility (+/-30,500 square feet), and Shops Complex (+/-46,000 square feet); Commons Areas, Exterior Yard Storage, and miscellaneous Accessory Buildings, master planned on a +/-60 acre site. Project to consolidate Roseville Public Works Departments, Vehicle Maintenance Shop, Central Stores Warehousing, and Administration Facilities. Project included numerous Common Meeting Rooms, Locker Rooms, Multi-Purpose Rooms, and Break Room facilities.

Site included Automatic Vehicle Washing Facilities - High Pressure, DriveThrough, Steam Clean - with Water Recycle Facilities and Fueling Facilities. • Tuolumne Utilities District – Centralized Office Facility Planning and design of four major Facilities (+/-32,000 square feet), including Administration Building (+/-12,000 square feet), Warehouse (+/-10,000 square feet), Vehicle Maintenance Facility (+/-5,000 square feet), and Operations Complex (+/-5,000 square feet); Commons Areas, Exterior Yard Storage, and miscellaneous Accessory Structures, master planned on a +/-14 acre site. Site included Wash Rack, Loading Dock, and Fueling Facilities.
• Facilities Support Services Building / Fleet Services Facility Planning and design of Facilities Support Services Building (+/-70,000 square feet) and Fleet Services Facility (+/-14,400 sf), Commons Areas, and Exterior Yard Storage, master planned on a +/-10 acre site. Project to consolidate UCDMC Departments of Fire Safety, Parking Services, Health Physics, Occupational Safety, Plant Operations and Maintenance, Architects and Engineers, and Fleet Operations and Maintenance. Facilities Support Services Building includes Administrative Offices, Shops, Warehousing, Exterior Yard Storage, Laboratories for Health Physics and Occupational Safety. Vehicle Repair Bays, with 50,000 lb. Vehicle Hoists; Overhead Reel System; Waste Oil Evacuation System; Battery Charging Area; 2-Ton Jib Crane; Tire Repair/Storage; Vehicle Wash and Water Recycle Facilities; Fueling Facilities; and Common Restrooms, Conference Rooms, and Break Areas. • Collection System Operations Facility
Planning and design of a major Replacement Facility (+/-22,500 square feet) for the Collection Systems Operations Division, and master planning and design of the existing Corporation Yard layout. Facilities include a new two-story facility housing Crew Operations, Administration, and Warehouse. Specifics include Crew Room, Locker and Shower Facilities, Offices, IT Facilities, Offices, and High-Bay Warehouse. Site work to include Covered Loading and Unloading Areas, Material Bins, Laydown Yard, Fleet Vehicle Parking, and Landscaping, on a 3.5 acre site that varies 70’ in elevation from north to south. Construction is Structural Steel Frame with a 20’ high tie-Back Retaining Wall.
• Placer County Water Agency Business and Administration Center Planning and design of new Business and Administration Center (+/-25,000 square feet); and Site Work, master planned on a +/-2.2 acre site. Project to consolidate PCWA Departments of Administration, Customer Service, Engineering, Accounting, and Human Resources. Facility includes Common Restrooms, MultiPurpose Rooms, and Break Areas.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
6 Space Study Needs Experience
Calpo Hom & Dong Architects is well-versed in the development of Space Study Needs, with emphasis on Operational and Design Concepts. CH&D has recent experience working with Public Government Agencies and Districts.

Space Study Needs Experience
• Yuba County Government Center
Space Study Needs Program to consolidate County Departments under one roof.

Departments include Public Works, Community Development, Personnel, Printing, IT, Agricultural Commission, Air Quality, and Elected Officials and Board of Supervisors. Space Study Needs Program was used to space plan existing +/-80,000 sf facility to house Departments and plan for growth. • City of Lincoln Public Works / Public Safety Facilities Space Study Needs Program to accommodate present and future planning for County Public Works Department and County Public Safety Department. Space Needs Study Program was used to space plan existing +/-60,000 sf facilities to house each Department separately and plan for growth.
• Tuolumne Utilities District Centralized Office Facility Space Study Needs Program to consolidate all Departments in a new complex, designed for expansion and growth. Departments includes Operations, Vehicle Maintenance, Warehousing, and Administration.
• Roseville Police Department Facility Amended Detailed Space Requirements Space Study Needs Program to determine physical expansion and improvements needed for the existing Police Facility. The changes in Law Enforcement practices and the growing population of the City of Roseville dictated the need for the 1997 Police Facility to readapt to keep pace with the City and citizens. • California Highway Patrol Museum
Space Study Needs Program to determine physical size requirements, adjacencies , and site requirements for future CHP Museum. Study included Exhibit and Support spaces for staff and public.
• UC Davis Medical Center Facilities Support Services Building Space Study Needs Program to determine physical size requirements, adjacencies , and site requirements for Support Services Departments, including Fire Safety, Parking Services, Health Physics, Occupational Safety, Plant Operations and Maintenance, Architects and Engineers, and Fleet Operations.

CH&D Architects Facilities
Calpo Hom & Dong Architects, established in 1984, offices are located in the Midtown District of Sacramento. Our offices, +/-5,900 sf, are fully networked to allow working in and out of the office space, with multiple meeting and collaboration spaces.

Detailed information on CH&D’s experience record regarding past performance and the ability to deliver projects on schedule and budget are available upon request, as is detailed information on any of the projects listed n this RFQ Submission.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
7 E. Staffing and Support
Calpo Hom & Dong Architects has a unique way of working with their clients, especially smaller communities, long distances away. In 2015, CH&D was awarded a project with the City of Yreka, for the renovation of an existing commercial building into a new Police and Dispatch Facility. CH&D Offices is located in Midtown, Sacramento, approximately 260 miles from Yreka. The Police Chief, Brian Bowles (retired), had been pushing for this long-needed project for over ten years previous; needless to say, Chief Bowles was super excited to finally see his hard work come to fruition. But Chief Bowles was nervous; during the interview, he asked, “I’ve never done this before, how do I communicate with you?” Dennis Dong, Lead Principle and Project Architect for CH&D, knowing that Civic Leaders in small communities often have to wear many hats, responded, “Chief, if we are awarded this job, I will commit one day each week to be in your office to discuss your project when you can.” The day we were awarded the project, Chief Bowles called Dennis and asked, “when can you come???!!!” Throughout the design process, and later during construction, Dennis Dong, every Tuesday, would have a desk at the old Yreka Police Facility, from 9:00 am to 5:00 pm! The Chief was able to schedule his appointments, bring in other City Officials and Consultants, and the project went very smoothly. Flash forward to 2020-2021, and Dennis Dong could be found biweekly in Willits (approximately 160 miles from Sacramento), with the Little Lake Fire Protection District, overseeing construction of their new fire Station No. 54. Likewise, to a lesser extent, with the Smith River Fire Protection District, on the design and current bidding of the Smith River Fire Station No. 1.

We will work the same with the City of Crescent City. We believe every client, big or small, and every project, big or small, is IMPORTANT! We will make ourselves available to physically be in your offices, respecting your schedules and availability, to best push the project forward. If online meetings are preferred, we will be available for those as well. We understand that each project is different, some large, some small, some straight-forward, some complex; we will treat each assignment with the same professional involvement and passion.

Case History:

Roseville Corporation
Yard
CH&D was selected as
Design Architect for the City
of Roseville Corporation
Yard. A Programming Study
and Master Plan had
previously been done by
another firm. The
Programming and Master
Plan was done under the
direction of the then Director
of Public Works; in the
transition to the Design
Phase, the DPW retired, and a
new position, Director of
Central Services, was created
to manage all CIP projects.

During the review of the
previous Programming and
Master Plan efforts, CH&D
noticed some resentment
amongst the supervisors.

When queried, the
supervisors complained they
were not included in the first
go-around, and did not expect
to have their opinions heard.

At this point, CH&D
requested permission to reconduct interviews with all of the User Groups, and to listen
to their input. By the end of
the sessions, all of the User
Groups had bought in to the
process; they may not have
agreed with all of the results,
but they were aware of the
parameters leading to those
results. The project
proceeded much smoother
after that interlude.

City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
8 F. Key Personnel
Calpo Hom & Dong Architects has made a conscious effort to control the growth of our Firm. This is to ensure to our clients that the Firm’s Principals are directly and actively involved in each project, from inception to completion.

CH&D manages Projects from a unique environment. The Office is set up into Studios, each with a Principal’s hands-on involvement. We have found that this collaboration between Principals with the Studios creates a dynamic and well-thoughtout end product. In this way, the Client always has a team of persons which may be contacted. We have found this to be very effective for allowing the Client’s concerns to get through to the Architect.

The CH&D Principals each contribute a unique strength to all of the Firm’s Projects.

With at least one Principal always active in any Project, the other Principals lend their support and constructive input.

Each Project at CH&D receives the full benefit of full-time participation by one Principal, and the benefits of expertise by the remaining Principals.

For the City of Crescent City Related Support Services RFQ, Calpo Hom & Dong Architects will dedicate Principal Dennis Dong, as the Principal-In-Charge and Project Manager, in charge of the day-to-day hands-on management of the Project. Dennis has a wealth of experience with designing Public Facilities, and also working with smaller jurisdictions and smaller budgets
Dennis Dong, AIA, CSI, maintains unique strengths in Design and Technical Expertise with Public Works, Facility Design, and Essential Services projects • Bachelors of Arts in Architecture,
University of California, Berkeley, 1972
• Licensed Architect, California: C-12,163
Licensed Architect, Nevada: 2,047
Licensed Architect, Arizona: 21,630
Licensed Architect, Oregon: 3,917
Licensed Architect, Montana: 2,119
Licensed Architect, Ohio: 1115287
Licensed Architect, Iowa: ARC79678
• LEED™ AP BD+C
• Member, American Institute of Architects (AIA)
Construction Specifications Institute (CSI)
National Trust for Historic Preservation
• 41 years experience; 38 years as Principal
Relevant Project
Experience for
Dennis Dong
. • Roseville
Corporation Yard
• UC Davis Medical
Center Facilities
Support Services
Building and Fleet
Services Facility
• Roseville Police
Facility
• Tuolumne Utilities
District Centralized
Office Facility
• Placer County Water
Agency (PCWA)
Business and
Administration
Center
• PCWA Corporation
Yard, Foresthill
• Lincoln Corporation
Yard
• Central Contra Costa
Sanitary District
Collections System
Operations Facility
• Dry Creek
Wastewater
Treatment Plant
(DCWWTP)
Collections Building
• DCWWTP
Environmental
Utilities Shop
Building
• Folsom Fire Station
Nos. 34, 36, 38, 39
• El Dorado Hills Fire
Station Nos. 84, 85,
86, 87
• Ceres Fire Station
Nos. 1, 3
• West Sacramento
Fire Station No. 45
• Lincoln Fire Station
Nos. 33, 34
• Winters Police-Fire
Facility
• Yreka Police Facility
• Willits Fire Station
No. 54
• Smith River Fire
Station No. 1
City of Crescent City: Request for Qualifications
Engineering, Planning, Environmental, Architecture & Related Support Services Calpo Hom & Dong Architects
9 J. References
Calpo Hom & Dong Architects appreciates the request for references, and encourages the County to call on and check these references. We feel this is the best way to verify and confirm qualifications.

John Thomen, Deputy Fire Chief, Little Lake Fire Protection District [email protected] / 707-354-4039 cell
Client, Willits Fire Station No. 54 Project
Project: Willits Fire Station No. 54
New Facility, ±11,063 sf; includes Apparatus Bays (5), Sleeping Quarters, Living Quarters, Training Room, and Administration Offices.

Pre-Engineered Metal Building
Dave Gamache, Police Chief, Yreka Police Department
[email protected] / 530-340-2375 cell
Client, Yreka Police Facility Project
Project: Yreka Police Department New Station Retrofit
Retrofit of an existing ca. 2009 Commercial Building (+/-9,000 sf) into new Police Department facilities. Facilities include Administrative Offices, Records, Dispatch, Patrol, Investigations, Evidence, EOC/Training Room, Secured Parking, Dog Kennels, and a Carport shelter for the Squad Cars.

Wood Frame, Concrete Slab, Wood Roof Truss construction.

Dan Allen, Facilities Manager, City of Roseville
[email protected] / 916-223-7741 cell
Client, Numerous Capital Improvement Projects for the City of Roseville Projects: Roseville Corporation Yard; Roseville Police Facility Project; Roseville Fire Training Facility; Roseville Fire Station 3; numerous renovations and remodeling projects for the City of Roseville.

Bruce Muramoto, Police Chief (retired), Winters Police Department [email protected] / 530-681-2867 cell
Client, Winters Police-Fire Facility Project
Project: Planning and design of new Two-Story Joint Police (+/-10,413 square feet) and Fire (±18,141 square feet) Facility (+/-33,458 square feet total).

Fire Station includes Apparatus Bays (4 x 2 vehicles deep), Administrative Offices, and Living Quarters with 12-Person Crew accommodations. Police Facility includes Administration, Patrol, Investigations, Crime Analysis, Records, Locker Rooms, Property/Evidence, Emergency Operations Room, Booking. Pre-Engineered Metal Building and Wood Frame construction. .

Ken Cusano, Fire Chief, Folsom Fire Department
[email protected] / 916-461-6313
Brian Reed, Capital Improvements Project Engineer, DPW, City of Folsom [email protected] / 916-837-9984 cell
Client, Folsom Fire Station Nos. 34, 38, 39 Projects
Project: Folsom Fire Station Nos. 34, 38, 39
Fire Station No. 34: New facility, +/-12,000 sf, design stage.

Fire Station No. 38: Existing facility, +/-4,524 sf, Remodel and Addition.

Fire Station No. 39: New facility, +/-10,000 sf, construction completed. \

CRESCENT CITY

REQUEST FOR QUALIFICATIONS TO PROVIDE

ENGINEERING, PLANNING, ENVIRONMENTAL,

ARCHITECTURAL & RELATED SUPPORT SERVICES

QUALIFICATIONS TO PROVIDE LANDSCAPE ARCHITECTURE,

URBAN DESIGN AND PLANNING SERVICES
SUBMITTED BY DESIGN WORKSHOP, INC.

RFQ #2022-001
MARCH 18, 2022
Design Workshop, Inc.

Landscape Architecture
Planning
Urban Design
Strategic Services
128 Market Street Ste 3E
PO Box 5666
Stateline, NV 89449
775-588-5929
designworkshop.com
March 18, 2022
Attn: Jon Olson
City of Crescent City
Public Works Department
377 J Street
Crescent City, CA 95531
Re: RFQ 2022-001 Request for Qualifications to Provide Engineering, Planning, Environmental, Architectural & Related Support Services
Dear Mr. Olson, Mr. Leighton and members of the selection committee, There are not many places in California or the country where you have access to some of the most beautiful natural landscapes from the ocean to the redwoods within a seven minute drive.

Add to these the rich cultural and historical aspects and the quaint, friendly small-town feeling, its understandable why Crescent City becomes a place to reside or return to on a regular basis.

Design Workshop is very familiar with Crescent City and the area and are excited to submit our qualifications for on-call landscape architecture and planning services and assist the city with future improvements for the community. During our previous experience providing the design inspiration for Front Street, we were able to gain an insight to what is important to those who live or run a business in the city and how important the revitalization of Front Street means to the community.

Our work with the California State Parks and National Park service on their joint master plan for Hiouchi Flat and Jedediah Smith Redwoods State Park informed us of the amazing landscapes that draws visitors from all over to enjoy these special places. The South Beach Trail Connection project expanded our experience and relationship with important stakeholders such as the Elk Valley Rancheria Tribe, the Del Norte Local Transportation Commission and Caltrans.

After reviewing the Request for Qualifications, Design Workshop is well positioned to assist in several ways. For projects that require landscape architectural and urban design services, we have extensive experience assisting cities, counties, public agencies and private landowners with site planning and design, community enhancement, parks and recreational facilities, waterfront revitalization, trails, along with monument signage and wayfinding. This includes full design and construction documents, permitting, and assisting with construction observation. For our planning expertise, Design Workshop has staff that are AICP certified and can assist the city in general plan updates, form-based codes, land use planning, master plans, design guidelines, development standards and vision plans. We can also be an extension of City staff to review plans and projects submitted to the city, as well as updating documents and procedures that may be required. We specialize in public outreach and engagement and are able to assist the city with informing, preparing and facilitating stakeholder meetings, community meetings, open house activities, virtual meetings as well developing content that can be used on the city website or other public forums.

Design Workshop is very familiar with on-call services contracts and currently provide on-call design services for several local, state, and federal agencies. These include several cities and counties, the National Park Service, California Tahoe Conservancy, Sonoma County Regional Parks, Monterey Peninsula Regional Park District, Tahoe Transportation District, and Save the Redwoods League. We recognize that servicing the contract requires good communication and team management to quickly respond to requests both small and large. We are committed to strong project management and providing you with excellent service. In addition, if specific expertise is needed for a project, we have access to a wide range of firms we have worked with in the past or can work with someone the city is comfortable with and can bring them on as a sub consultant with minimal compensation by Design Workshop to manage efforts. We are also included on the AECOM on-call team (under a separate submittal) so would play a similar role under their team structure.

Our success with providing the services required for this contract combined with our team members’ specific expertise ensures the City will receive our highest commitment for each project. Over the years we have truly enjoyed our professional relationship with City staff and are very excited to continue working closely with you as an extension of your staff on the wide range of services listed in the RFQ and other needs that may arise. The staff assigned to this oncall contract are well-versed in providing creative, practical design solutions efficiently and costeffectively. As a whole Design Workshop brings to this contract:
• A broad range of experience with similar projects locally, regionally, and nationally • A clear and inclusive design process that we established and follow • Experience working in remote areas and an understanding of potential design and construction constraints
• A thorough understanding of planning, design, funding, operations, and maintenance elements for parks, trails, and open spaces
• A proven track record gaining approvals in a timely manner for projects of various scale and complexity
• Experience working with multiple agencies and the public to develop and implement projects • An extensive knowledge of regulatory agency codes and ordinances including accessibility • Proprietary tools to manage budget, schedule, and control costs • A wide range of graphic skills to engage and convey project information to the public • Premiere trail planning, design, and mapping expertise • GIS data gathering and analysis capacities to inform decision-making and resource allocation Thank you for the opportunity to provide information about Design Workshop and our team. We appreciate your consideration as you make selections for on-call contracts. We look forward to hearing from you, and please do not hesitate to contact me if you have any questions by phone at 775-588-5929 or by email at [email protected].

Firm Contact Information Design Workshop Inc
PO Box 5666, 128 Market St Ste 3E
Stateline, NV 89449
775-588-5929, [email protected]
Authorized Representative & Contact Steve Noll, Principal CA License # Steve Noll, California Licensed Landscape Architect #3300 Services Proposed to Provide Landscape Architecture, Urban Design, Planning, Park and Recreation Planning, Waterfront Revitalization, Land Planning, Form Based Code, Public Outreach
Respectfully,
Steve Noll
Principal
3 Organization of Firm
Design Workshop
Landscape Architecture,
Urban Design, Planning,
Recreation Planning
Type of Organization
Corporation
Firm Size
Firm: 160 (109 Landscape
Architects/Designers, 20 Planners)
Lake Tahoe Studio: (8 Landscape
Architects/Designers, 2 Planners)
Number of Years in Business
Firm: 53 years
Lake Tahoe Studio: 25 years
Location where work to be
performed
Stateline, NV (Lake Tahoe Studio)
Whether designing a restorative private garden, developing the vision for a contemporary park or re-imagining an under-performing downtown center, we go beyond the project itself to create places of timeless beauty and meaningful connections.

We are a community of designers, planners and strategists, who love what we do. We design for people - not just today but for future generations.

Our performance-based approach yields measurable results and projects that stand the test of time. In other words, we don’t just hope for sustainable projects; we rely on our process to deliver them.

We call this process DW Legacy Design®.

Our team offers both local, regional, national, and international expertise in landscape architecture, urban design, planning and recreation planning. We have built a portfolio of parks, streetscapes, and recreation planning in communities throughout Northern and Central California that help us understand the issues and opportunities related to public projects and the ways in which to successfully create projects that are celebrated. We create places for people, following the dictates of the land – not just today but for future generations.

On-Call Contract Experience
Design Workshop has worked with all levels of federal, state, regional, and local government agencies and private clients providing on-call services similar to those required for this RFQ. Based upon the type of services needed, the project schedule and funding available, we will work closely with the City to provide the staff and expertise best suited to fulfill the tasks.

Organization
of the Firm
Design Workshop is an international design studio,
integrating landscape architecture, urban design,
planning and strategic services. For over 50 years,
“workshop” remains a hallmark of our firm, supporting
collaboration and experimentation where clients and
designers solve problems together.

Organization of the Firm
4 Organization of Firm
Breadth of Services
Providing the breadth of services
associated with retainer contracts
requires a team with a deep
resource base of available
technology and professionals
committed to the timely
completion of the project. Our team
understands the requirements
of such contracts and have the
ability to adjust staffing in order to
provide exemplary service. Design
Workshop’s success as a planning
and design firm is due largely to
careful scheduling, staffing, and a
proactive approach to ensure that
projects are completed on time and
members of the team have been
selected for their proven ability to
complement this capability.

Project Management
To manage the process and
resources, we use a proprietary
project delivery system which is a
repository of all the tools required
for project managers and designers
to successfully organize and lead
projects. This also allows us to
manage any risks or schedule
changes associated with the
process and adjust as needed.

Since we provide landscape
design and planning services
throughout California having a
strong understanding of the current
codes, policies and guidelines at all
levels of government is critical to
the success and longevity of our
firm. Our staff has built a reputation
for developing working relationships
with long lasting positive results
resulting in several current on-call
contracts.

Working Relationships
with Public Agencies
Design Workshop has had a
long and successful history of
working with multiple governing
agencies. Our past and current
client list includes local and state
agencies, non-profit organizations
such as Town of Mammoth
Lakes, Town of Truckee, City of
Angels Camp, Calaveras Council
of Governments, City of Carson
City, Mariposa County, City of
Santa Rosa, Sonoma County,
Monterey Peninsula Regional Parks,
Tahoe Regional Planning Agency,
California State Parks, Nevada
State Parks, California Coastal
Conservancy, National Park Service,
Caltrans, Save the Redwoods
League, and California Tahoe
Conservancy.

We have prided our longevity with
these agencies because we are
rigorous in being on time (both
in design and in construction
management), on budget (provide
cost estimates at every major
milestone of a project), and
anticipating short and long term
operations and maintenance as part
of the design process, not just at
the end of a project.

Providing High Quality,
Permittable Design and
Design Documentation
Our team understands what it takes
to successfully lead projects of
varying size and scale. We like to
say our work ranges in scope from
“a region to a rock”. Regardless of
size, we ensure quality and design
by first asking the hard questions
and then testing and measuring
outcomes to yield robust designs.

We understand how to provide
quality and timely services under
these contract agreements and
have provided a full team that will
be able to exceed your expectations
on planned and future projects.

We also recognize that our public
dollars are finite. Our experience
that sets us apart includes working
with government agencies,
longevity of staff experience and
understanding of public processes,
success getting projects permitted
and receiving environmental
clearance, and recognition from
our peers regarding the quality
and excellence of our planning
documents and built work. We
reduce rework and stay on budget
by utilizing our quality management
and project management processes
throughout the life of the project.

We view our team as being an
extension of Crescent City staff and
find the best way to contribute and
bring our expertise to complement
yours.
5 Work Experience and Qualifications
Related Work Experience and Qualifications
Our Expertise Benefiting
Crescent City
Design Workshop is very familiar with
Crescent City and the surrounding
area and are excited to submit our
qualifications for on-call landscape
architecture and planning services
and assist the city with future
improvements for the community.

As a sub consultant to Drake Haglan
and Associates, Design Workshop
was responsible for developing the
initial design and inspiration for the
redevelopment and realignment for
Front Street. This included developing
the theming, options for gateway
signage and monuments as well as
providing full landscape design for
the project. This involved working
closely with City staff, preparing for
and facilitating the public engagement
process, and developing the ideas that
ultimately resulted in the first phase
of Front Street to be constructed.

Understanding the history of the area,
the importance of Front Street and
Waterfront Park from a residents and
visitor perspective was important
when developing the ideas.

With this on-call services contract
the City will have access our services
which include site planning and
design, community enhancement,
parks and recreational facilities,
waterfront revitalization, trails,
along with monument signage and
wayfinding. This includes providing
full construction and bid documents
as well as construction observation.

We understand there may be a
need to assist the city in planning
related services as well. Our planning
staff has assisted several cities and
counties with general plan updates,
form-based codes, land use planning,
master plans, design guidelines,
development standards and vision
plans. Design Workshop also
specializes in inclusive public outreach
and engagement and we are able to
assist with informing, preparing and
facilitating stakeholder meetings,
community meetings, open house
activities, virtual meetings as well
developing content that can be used
on the city website or other public
forums.

Delivering Projects on
Schedule
Every phase shall involve active
project management from Design
Workshop’s Principal-in-Charge
and the Project Manager. Design
Workshop strives to ensure quality
through clear communication and
dialogue with our clients and amongst
our team. Prior to the Strategic Kick
Off Meeting, we will create and
maintain a detailed project work
schedule that will integrate with
our Deltek Vision software that will
ensure that we have the appropriate
resources for the project secured.
sidewalks, improved public spaces along with bicycle and pedestrian safety improvements contributing to a more
walkable community.

Client Placer County
Services Provided Landscape Architecture, Streetscape
Design, Public Facilitation, Visualizations, Construction Observation
Kings Beach
Commercial Core
Kings Beach, California
As part of the redevelopment of the Kings Beach
commercial core, Design Workshop provided preliminary
studies that explored alternatives for improving land
uses, redevelopment and community enhancement.

Alternatives explored developing transect and form based codes, design guidelines and development standards.

The alternatives were presented and discussed in detail with the public over a series of four public meetings. The preferred alternative was finalized and an environmental impact report performed and certified.

Design Workshop then prepared detailed design drawings
and full construction documents for the streetscape
improvements. Working closely with business owners, the project team ensured their concerns are addressed while integrating private property interface into the streetscape design. The end result was nearly 8,000 linear feet of new 6 Work Experience and Qualifications
through tidal pools and sandy beaches, and on to higher lands of redwood trees and hills.

Client Crescent City
Services Provided Community Planning, Urban Design,
Construction Documentation, Wayfinding, Theming
Front Street
Redevelopment
Crescent City, California
Located just off the Harbor in Crescent City, California, Front Street is a gateway into a community rich with
history and culture. Design Workshop worked with the
city on the redevelopment of this corridor to promote
opportunities for pedestrian and bicycle travel, as well as creating a sense of central space or village atmosphere where people could meet, socialize, and eat. We led
the design and theming for the project, developed the
renderings and graphic illustrations to support the ideas and presented at stakeholder and public meetings. The
images provided a clear vision for how the beach front
commercial and residential areas could be enhanced to
attract visitors and improve business. The improvements and thesis aesthetic theme take the visitor from deep sea, Client
City of Lakeport
Services Provided
Site Analysis, Landscape Architecture, Conceptual Design, Public Outreach

LAKEPORT LAKEFRONT REVITALIZATION PLAN
LAKEPORT, CA • CITY OF LAKEPORT August 2016
Alternative 3a - Focus Area
Dutch
Harbor
Boat Launch
Boat Launch
Boat Launch
Public
Library Docks
Park
Boardwalk
Skate Park
Community Center
Multi-Use Lawn
Promenade
Promenade
Lakeport
Fire Dept.

Lake County
Superior Court Lake County
Museum
City Hall
Pier
Yacht Club
Recreation Center with
Indoor Pool
Boutique Hotel with
Conference
Adventure Play
9th Street
7th Street
6th Street
5th Street
4th Street
3rd Street
2nd Street
1st Street
Main Street Main Street
Forbes Street
Lakeport Lake Front
Revitalization Plan
Lakeport, California
Historically, Clear Lake has been a destination for wateroriented summer recreation for those residing in northern California, and specifically the Bay Area. Lakeport boasts the finest boat ramps and free lake access on Clear
Lake. The City, with approximately 3.8 miles of shoreline, including a public marina and recreation-based businesses, historically has attracted a high number of visitors. A recent decline in visitor due to the development of reservoirs providing similar recreation activities, the closing of Konocti Harbor Resort and Spa, the diminishing water quality
of Clear Lake, and the growth of the Napa Valley wine
industry. Recognizing that the lake front plays a critical role in the city’s identity for both residents and visitors, the Design Workshop worked with the city in a planning effort focused on identifying opportunities to improve the area physically, environmentally, economically and socially. The plan takes an implementable approach to developing the
Lakeport Lake Front Revitalization Plan by understanding existing land uses, current market conditions and
community needs. The plan provides a road map for future improvements, as well as encouraging reinvestment.
7 Work Experience and Qualifications
Services Provided
Park Planning, Landscape Architecture, Public Outreach
and Facilitation
Veterans Memorial
Beach Park
Healdsburg, California
Along the Russian River, this beach is an important asset and recreation resource for residents and visitors to enjoy the river and park for personal and community events.

As the population continues to grow and interest in the park increases, Design Workshop is preparing the first
master plan and an environmental document that provides the framework for allocating funding and resources for
improving and maintaining this community treasure.

Project goals include uniting the beach area and upland area to provide complimentary uses, exploring expanded
uses and amenities, revenue generation, improving
connectivity to the park and improving access to the river with launch and take out opportunities.

Client
Sonoma County Regional Parks
Client
City of South Lake Tahoe
Services Provided
Master Planning, Site Analysis, Public Outreach
56 Acres Park
Master Plan
South Lake Tahoe, California
For over 40 years the site referred to 56 Acres has
provided a wide range of activities and created fond
memories for residents and visitors from all over the world.

The location in the center of the City of South Lake Tahoe, adjacency to Lake View Commons Beach, the existing
recreation and overnight accommodations on site, the
proximity to other recreation and educational facilities and convenient shopping within walking distance makes the
site a community hub and a basecamp for many visitors.

Working closely with the City, stakeholders and the public, the Design Workshop team is developing a master plan
that will elevate the recreation and community enjoyment and experience. The team is focusing their experience
in integrating park design with economic, community,
environmental, and aesthetic considerations to create a master plan for the site that embraces the civic pride and enjoyment of the local community while creating a regional and nationally recognized park destination.
8 Work Experience and Qualifications
athletes. Design Workshop was tasked with creating a
design that did not just limit the honors to Olympic athletes but allowed for past, present and future honorees.

Client City of South Lake Tahoe
Services Provided Landscape Architecture, Streetscape
Design, Construction Documentation and Observation
Harrison Avenue and
Champions Plaza
South Lake Tahoe, California
The Harrison Avenue business district is a classic example of an area built in the beginning of automobile dominance.

Located adjacent to one of the most scenic beach fronts in South Lake Tahoe, it serves as a model for positive
business transformation and partnership between the
City and the business owners. Design Workshop worked
extensively with business and property owners to create a design for this 5-block district that embraced the unique architecture and connected the commercial area with
the surrounding natural environment. Existing conflicts between pedestrians, bicyclists and vehicles have been
resolved to improve overall safety as well preserving
commercial parking spaces. Connectivity to adjacent
destinations such as the lake, recreation center and the school district have been improved with new sidewalks
and a bike path. One of the new spaces created was
Champions Plaza, where a former parking lot with prime
lake views was transformed into a place to celebrate local Client
Tahoe City Public Utility District
Services Provided
Landscape Architecture, Urban Design, Conceptual Design, Public Facilitation, Final Design and Permitting
Heritage Plaza
Tahoe City, California
As part of a retainer contract with the California Tahoe Conservancy, Design Workshop developed conceptual
design solutions for an intimate new community park in
downtown Tahoe City. The site, which is surrounded by
mixed-use retail, is located on a bluff with uninterrupted views of Lake Tahoe and the surrounding mountains and is adjacent to the historic Watson cabin.

Design Workshop facilitated steering committee and
community meetings to discuss the vision, uses, and
importance of this plaza with community stakeholders. The result was a concept that preserves the views of the lake while providing a structure for civic events to take place.

Ample walls for passive seating and relaxing are proposed along with areas for interpretation of the rich historical and cultural aspects of Tahoe City. A lower overlook area provides the stage for small informal performances and is visible from all areas of the park. Design Workshop was retained to finalize the design, aid with environmental permitting, and complete construction documentation.
9 Staffing
A primary focus of the Design
Workshop Lake Tahoe studio is
park and streetscape design and
recreational planning. Each of our
staff has provided similar design and
management skills required for this
on-call services contract.

Our team has the experience and
capacity to meet your individual
project goals and schedules. To
provide the breadth of services
associated with retainer contracts
requires a team with a deep resource
base of available technology and
professionals committed to the timely
completion of the project. Design
Workshop has been involved with a
number of on-call service contracts
and, as such, we understand the
requirements of such contracts and
have the ability to adjust staffing in
order to provide exemplary service.

Our success is due largely to careful
scheduling, staffing and a proactive
approach to ensure that projects are
completed on time and members of
the team have been selected for their
relevant experience and ability to think
critically, take the initiative to problemsolve, and address the specific needs of each project.

We affirm that our team has enough
capacity to manage numerous
on-call projects at any given time.

The Lake Tahoe studio has four
landscape architects, two planners,
four landscape designers and one
administrative support person. In
addition, we consider our firm one
office with long hallways. We
continually work together through
cross office collaboration and
additional firm-wide resources can
be made available to meet individual
project needs.

Our team considers the opportunity
to provide services to the City to be
of utmost importance and, if selected
to provide such services, projects will
receive full commitment by staff.

Project Management
Design Workshop annually invests
in staff training and development
to advance our team’s abilities and
methods to ensure quality deliverables
and service throughout the design
and planning process. This includes
attending multiple courses focused
on servicing our clients. We train and
use management software so project
managers have the best tools available
to organize resources, processes and
budgets. Finally, and most important,
we regularly communicate with
our clients and other consultants.

We find great success and value
providing ongoing dialogue and
interaction to ensure we are able to
deliver the quality of service the City
staff expects within the anticipated
schedule and budget.

Our Principals provide weekly project
reviews to proactively identify project
needs and offer quick access to
national best practices. The staff
identified to service this on-call have
dozens of years of practice leading,
managing and implementing projects
in California with diverse teams of
sub-consultants. Our firm has honed
its processes over 50 years to deliver
high-quality, well-resolved projects by:
• Assigning the most experienced
personnel to given projects
• Using firm standards for design
and documentation
• Using firm policies for diligent
internal design reviews and quality
management reviews
Our project management philosophy is
built upon anticipation and preparation
for all issues that may arise throughout
the project process. By constantly
considering and developing the
appropriate plan to address political,
environmental, social and design
challenges and opportunities, we can
better serve our clients and deliver the
highest quality product.

Strong and effective project
management is essential in
conducting successful projects. We
maintain project schedules and project
milestones, identify and monitor
critical paths to success for projects,
and track and report budget items to
the clients promptly and efficiently.

Off hour resources is not applicable to
our service type.

Staff Expertise
Lake Tahoe Studio
Landscape Architecture Licensed
Stephanie Grigsby, CA #4801, UT
Steve Noll, CA #3300, NV #510
Benjamin Fish, CA #4926, NV#1086
Tyson Murray, NV #1095
LEED Design Certified
Stephanie Grigsby, LEED GA
Benjamin Fish, LEED AP
American Institute of
Certified Planners
Stephanie Grigsby
Steve Noll
Construction Document
Technologists
Stephanie Grigsby
Benjamin Fish
Staffing
10 Key Personnel
Key Personnel
Staff Education/Experience Relevant Experience
STEVE NOLL, PLA, AICP, Principal-in-Charge
Throughout his 37-year career, Steve has led land planning and design projects that have shaped and redefined communities. Due to the strict regulatory environments and economic challenges inherent in the projects he leads, Steve nurtures respect and trust with the public agencies by guiding them through complex projects and implementation processes.

Years of Experience: 37 years
Education
• Bachelor of Science, Landscape
Architecture, California Polytechnic
State University, San Luis Obispo
Licenses/Certifications
• Professional Landscape Architect:

CA #3300
• Council of Landscape Architectural
Regulatory Boards (CLARB)
• American Institute of Certified Planners
• Front Street Redevelopment – Crescent City, CA
• Kings Beach Streetscape and Commercial Core – Kings Beach, CA
• Downtown Carson Street Urban Design – Carson City, NV • Muir Woods Sustainable Access Plan – Mill Valley, CA
• Veteran’s Memorial Beach Park Plan – Healdsburg, CA
• Roseland Community Park and Trail – Santa Rosa, CA
• Austin Park Renovations – Clearlake, CA
• 56 Acre Park Master Plan – South Lake Tahoe, CA
• Austin Park Renovations – Clearlake, CA
• Heritage Park Campus – Henderson, NV
• Heritage Plaza – Tahoe City, CA
BENJAMIN J. FISH, PLA, LEED AP, CDT, Project Manager
Benjamin Fish is a talented project manager, skilled in working collaboratively across disciplines and on a variety of project types. With successful design and management skills gained over the last 21 years, Benjamin will apply his knowledge to encourage collaborative design, communication and a process that runs smoothly.

Years of Experience: 21 years
Education
• Bachelor of Science Landscape
Architecture University of
Massachusetts-Amherst
Licenses/Certifications
• Licensed Landscape Architect:

CA #4926
• LEED®AP
• Certified Construction Document
Technologist (CDT)
• Kings Beach Streetscape and Commercial Core – CA
• Lakeport Lake Front Revitalization Plan –Lakeport, CA • Harrison Avenue Improvements and Champion Plaza – South Lake Tahoe, CA
• Angels Camp Highway & Corridor Plans – Angels Camp, CA • Valley Springs Complete Streets – Valley Springs, CA
• Downtown Carson Street Urban Design – Carson City, NV • Veteran’s Memorial Beach Park Plan – Healdsburg, CA
• Austin Park Renovations – Clearlake, CA
• Tahoe Donner Trails Master Plan Update – Truckee, CA
• 56 Acres Park Master Plan – South Lake Tahoe, CA
• Heritage Plaza – Tahoe City, CA
MADISON PONG, Landscape Designer
Madison has contributed to many public outreach efforts for various Design Workshop projects and is passionate about connecting community and landscape through an understanding of the communities she works with as a designer. Prior to joining Design Workshop, she worked as a horticulturist and has a deep understanding of, and passion for garden cultivation and management.

Years Experience: 4 years
Education
• Bachelor of Landscape Architecture,
Utah State University
• 56 Acres Master Plan – South Lake Tahoe, CA
• Spooner Frontcountry Renovation – Lake Tahoe, NV
• Veteran’s Memorial Beach Park Plan – Healdsburg, CA
• Muir Woods Sustainable Access Plan – Mill Valley, CA
• Tahoe South Events Center – Stateline, NV
• SLT Recreation and Aquatics Center – South Lake Tahoe, CA • San Ramon Walking District Master Plan – San Ramon, CA • Missoula County Pathways and Trails Master Plan – MT
DANI BAIN, Landscape Designer
Dani has experience in both large and small scale projects in institutional, residential, hospitality, recreation, and site management plans. She is able to communicate design by starting a project with draft sketches to using computer graphics and finally using modeling software to visualize project design.

Years Experience: 2 years
Education
• Bachelor of Landscape Architecture
California Polytechnic State University,
San Luis Obispo
• Career Technology Education Academy – Reno, NV
• Carcione & Canepa Ranches Public Access Plan – Mogul, NV • Veteran’s Memorial Beach Park Plan – Healdsburg, CA
• San Ramon Walking District Master Plan – San Ramon, CA • Eagle Valley Middle School – Carson City, NV
11 References
Project References & Key Personnel References
Front Street Redevelopment
Eric Wier, City Manager, City of Crescent City,
[email protected], 707.954.6365
Reference for Steve Noll
56 Acres Park Master Plan
City of South Lake Tahoe, John Hitchcock, Planning
Manager, [email protected], 530.542.7472
Reference for Steve Noll, Ben Fish, Madison Pong
and Dani Bain
Veterans Memorial Beach Park
Sonoma County Regional Parks, Mark Cleveland,
Senior Park Planner, Mark.Cleveland@sonomacounty.org. 707.565.3349 Reference for Steve Noll, Ben Fish, Madison Pong
and Dani Bain
Kings Beach Commercial Core Streetscape
Placer County, Dan LaPlante, Associate Engineer,
[email protected], 530.581.6231
Reference for Steve Noll and Ben Fish
Rancho Corral de Tierra Feasibility Study and
Site Management Plan
National Park Service, Golden Gate National
Recreation Area, Kirsten Holder, Landscape
Architect, Planning and Environmental Programs,
[email protected], 415.423.7665
Reference for Steve Noll, Ben Fish, Madison Pong
and Dani Bain
Harrison Avenue Streetscape and
Champions Plaza
City of South Lake Tahoe, Jim Marino, Capital
Improvements Project Manager, jmarino@cityofslt.
us, 530.542.6027
Reference for Steve Noll and Ben Fish
References

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT STATEMENT OF QUALIFICATIONS

TO PROVIDE ENGINEERING

AND ENVIRONMENTAL

SERVICES

STATEMENT OF QUALIFICATIONS
Prepared by: Prepared for:

EBA Engineering City of Crescent City
825 Sonoma Avenue, Suite C Public Works Department
Santa Rosa, California 95404 March 18, 2022

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
1 COVER LETTER
City of Crescent City March 18, 2022
Public Works Department
377 J Street
Crescent City, CA 95531
RE: Statement of Qualifications to Provide Civil and Environmental Engineering Services EBA Engineering (EBA) is pleased to present this Statement of Qualifications (SOQ) to the City of Crescent City Public Works Department to provide professional civil and environmental engineering services. EBA Engineering is a multi-discipline firm specializing in sustainable design for an evolving world. With over 40 years in business and the experience of thousands of projects in California including current master service agreements with the City of Santa Rosa, the County of Sonoma, the City of Ukiah, and the City of Willits, EBA has the expertise and relationships to help drive your project to a successful outcome. EBA’s civil, environmental, and geologic professionals work closely together to provide you with the depth of experience and a wealth of knowledge to tackle even your toughest project challenges. Our constant involvement with the regulatory agencies ensures that your project stays on track to meet its time and budget goals. In recent years, EBA has continued to grow in a variety of scopes of work and geographical locations, included the development of a satellite office in Eureka, California for services along the North Coast.

EBA’s specific services for consideration in this SOQ include one or more of the following:

Civil Engineering Services:
 General Design
 Preparation of Plans, Specifications, and Opinions of Probable Cost  Land Surveying
 Permitting
 Field Investigations
 Cost estimates
 Providing Professional Services During the Bid Process  Drafting and Design
 Shop Drawing Review
Environmental Engineering Services:
 Permitting
 Field Investigations
 Report Preparation
 Assisting the City in Securing Grant or Project Financing  Regulatory Compliance
 Additional Environmental Services not Specified in RFQ No. 2002-001

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
2 EBA Engineering operates as a private California corporation. EBA’s corporate officers are:
 Nazar Eljumaily, President
 Dale Solheim, Principal Engineer/Vice President
 Damon Morelli, Managing Engineer/Vice President
Any of the above officers; Mr. Eljumaily, Mr. Solheim, or Mr. Morelli are authorized to negotiate on behalf of EBA Engineering and execute the proposed contract. Please direct all correspondence during the Proposal selection process to Damon Morelli, Vice President, EBA Engineering, 825 Sonoma Ave.

Santa Rosa, CA 95404, 707.544.0784, [email protected].

EBA carries insurance that meets or exceeds the requirements of most Standard Professional Services Agreement. The proposed services and prices will remain valid for 180 days following the date of this letter.

Thank you for the opportunity to submit this proposal for your consideration. Damon Morelli, undersigned, is authorized to bind the firm for this contract.

Sincerely,

EBA ENGINEERING
Damon Morelli, PE 63621
Vice President – Managing Engineer

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
3 SECTION I – ORGANIZATION OF FIRM
Organization of the Firm. EBA is comprised of a team of professional and qualified individuals with the direct experience needed to deliver civil engineering and environmental services for the Public Works Department. EBA is a California Corporation since 1988, with the Small Business Enterprise No. 43664. Additionally, EBA holds a California Contractors License (No. 662725) with a Class Certification of “A-HAZ”. The corporate officers for EBA are Nazar Eljumaily (President), Dale Solheim (Principal Engineer/Vice President), and Damon Morelli (Managing Engineer/ Vice President).

The team will be led by Damon Morelli, P.E. for civil engineering and Matt Earnshaw, P.G., C.E.G., C.Hg for environmental service, both of whom are currently serving as Project Managers for our work with other engineering and environmental Master Service Agreements. They will be assisted and backed-up by Matthew Machi, P.E. for civil engineering and David Noren, REA for environmental services. Other available technical support staff are included in the following Organization Chart. Qualifications for the key personnel and their back-ups are included below.
illustratinganagement structure and individuals that will be involved with this Project and will comprise EBs Project Team

Qualifications and Experience.

EBA is fully qualified to perform the civil engineering and environmental services for the Public Works Department. We have relevant background to support proponents of such projects and can work effectively with staff of the Public Works Department and other design professionals who may be engaged on a project. EBA has a history of successfully interfacing and coordinating with the regulatory agencies governing all facets of civil engineering design and environmental permitting. We also recognize and understand the importance of coordination with other design professionals who may be involved with the project throughout the design, permitting, and construction process.

Principal-in-Charge
Dale Solheim, P.E.,

LEED AP

EBA ENGINEERING
Key Personnel Assigned to the Team
Damon Morelli, P.E., LEED AP, QSD
Matthew Earnshaw, P.G., C.E.G., C.Hg. QSD
Backup Personnel
Assigned to the Team
Matthew Machi, P.E.

Matt Kowalski, P.G.

David Noren, REA
Technical Support, Available as
Needed
David Noren, REA
Mike Delmanowski, P.G., C.E.G., C.Hg
Bret McIntyre, P.G., C.E.G., QSD
Max Kruzic, P.G., C.Hg.

Kathy Hicks, P.E.

Chuck Katz, L.S.I.T.

Kevin Coker
Subconsultants
Kenneth R. Hughes, S.E.

Kevin Braun, C.I.H.

Earth Safety Dynamics
Mike Burke, Brokaw Design
Bob Gerhold, Nor Bay Consulting
I
1 ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
4 Firm Profile: Firm size - total 23
Professional Civil Engineers................................................................................6 Professional Geologists ......................................................................................7 Certified Engineering Geologists.........................................................................3 Certified Hydrogeologists ....................................................................................3 Registered Environmental Assessors..................................................................4 Engineer in Training / Land Surveyor in Training.................................................1 Geologist in Training ...........................................................................................1 Environmental and Engineering Staff ..................................................................7 LEED Accredited Professionals...........................................................................3 Qualified SWPPP Developer...............................................................................3 Qualified SWPPP Practitioner.............................................................................2 Administrative / Support Staff .............................................................................4 Note: Some staff are professionally certified in more than one discipline.

EBA has over 40 years of experience providing superior service to our public and private clients. Over the 40 year of service, EBA has performed civil engineering and environmental services throughout the State of California working under multifaceted regulatory requirements. Some of those project include:
 Former Peterson Tractor SLIC Remediation, Eureka, CA
 Ghera Trust SCAP Grant Investigation, Arcata, CA
 CEQA Documentation, Pantheon, Eureka, CA
 Twin Cities Police Headquarters, Larkspur, CA
 Union City Fire Station No. 3, Union City, CA
 Delta Household Hazardous Waste Collection Facility, Pittsburg, CA  Sonoma Valley Sheriff Substation, Sonoma, CA
 San Joaquin County Household Hazardous Waste Facility, Stockton, CA  Santa Rosa Junior College Petaluma Campus Parking Lot Restoration, Petaluma, CA  Amador County Administration Building, Jackson, CA
 Western Placer Public Tipping Facility, Placer County, CA  Central Disposal Site Operational Improvements, Sonoma County, CA  Lake County Transit Facility, Lake County, CA
 CalFire – Tehama / Glenn Ranger Unit Headquarters Replacement, Red Bluff, CA  Stony Point Rock Quarry Groundwater Management Program, Sonoma County, CA  Central Landfill Corrective Action Plan, Sonoma County, CA  Guenoc Winery Environmental Assessment and Monitoring, Lake County, CA  Toland Road Landfill Expansion & Slope Stability Analysis, Ventura County, CA  Visalia Landfill WMU-I Final Closure, Tulare County, CA  SMART Property Environmental Site Investigation, Santa Rosa, CA  Orange Avenue Landfill Final Closure, Fresno, CA
 Elk Grove Special Waste Collection Center, Elk Grove, CA We are proud to provide detailed products, regulatory compliance, and quantifiable results to our clients utilizing the flexibility and fortitude only a small business can provide. The projects listed above are just a small fraction of the work EBA has completed, upon further discussion with the City, we will be happy to detail dozens of additional projects that could be synonymous with the needs of the Public Works Department.
t N G I N t f c K I N G

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
5 SECTION II – RELATED WORK EXPERIENCE AND QUALIFICATIONS

As noted above, the team will be led by Damon Morelli, P.E. for civil engineering services and Matt Earnshaw, P.G., C.E.G., C.Hg., QSD for environmental services. They will be supported and backedup by Matthew Machi, P.E. for civil engineering and Matt Kowalski, P.G. for environmental, in addition, EBA has 23 team members with active rolls in all EBA engineering and environmental projects. An abbreviated list of EBA’s major projects associated with supporting government owned facilities are presented below, a more detailed description of relevant projects are in the following section.

Site Engineering for Public and Private Projects
EBA has experience in planning, designing, and permitting of Public Facilities and private development projects. Services have included all aspects of the development process including site planning and layout, general design, topographic and boundary surveying, developing alternative designs, preparation of design development and construction documents, design of utility replacement, grading and drainage design including LEED requirements, preparation of erosion and sediment control plans and storm water pollution prevention plans for both industrial and construction activities, and construction cost estimating. The following is a partial list of Public Facility and private development projects for which EBA has provided design services.
• Twin Cities Police Headquarters, Larkspur, CA
• Central Sonoma Valley Trail, Sonoma, CA
• Joe Rodota Trail Bridge Replacement Project, Sonoma County, CA • West County Trail – Forestville Sonoma Valley Central Trail, Sonoma, CA • Quinn Central Plant, SRJC – Santa Rosa Campus, Sana Rosa, CA • Emeritus Circle – Parking Improvements-SRJC – Santa Rosa Campus, Sana Rosa, CA • Elliott Avenue Closure – Phases 1 & 2, SRJC Santa Rosa Campus, Santa Rosa, CA • Los Guilicos Complex – Accessibility Improvements, Sonoma County, CA • Elk Grove Special Waste Collection Center, Elk Grove, CA • Repair Active Vehicular Barrier – Main Gate, Nellis Air Force Base, Las Vegas, NV • Presidio Coastal Trail & Golden Gate Conservancy SWPPP, San Francisco, CA • Rodeo Valley Trail Improvements Phase 1 and 2 SWPPP, Marin County, CA Environmental / Geological Projects
EBA has experience on a wide variety of environmental and geologic investigation and remediation projects. Environmental project experience has included the performance of environmental due diligence, investigation, characterization, and remediation. Geological project experience has included engineering geologic evaluations and reports, slope stability analysis, soils classification, hydrogeologic characterization investigations, and evaluation of regional seismicity and faulting. The following is a partial list of the projects for which EBA has provided environmental / geologic design services:
• City of Santa Rosa Municipal Service Center, Santa Rosa, CA • City of Santa Rosa Fire Stations 4,5,6, Santa Rosa, CA • City of Santa Rosa Public Safety Building, Santa Rosa, CA • City of Ukiah Corporation Yard, Ukiah, CA
• City of Willits Corporation Yard, Willits, CA
• City of Healdsburg Former Ag Building, Healdsburg, CA • Former Peterson Tractor, Eureka, CA
• County of Sonoma Administration Drive Center, Sonoma County, CA • County of Sonoma Junior College, Santa Rosa, Petaluma, • Sonoma State University, Rohnert Park, CA
• Graton Fire Protection District UST Investigation and Remediation, Graton, CA • Landfill Sampling/reporting for Sonoma County, Willits, Ukiah, Merced, and Tulare t N G I N t f c K I N G

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
6 PROJECT DESCRIPTIONS
The following pages are descriptions for some of the above relevant projects describing the project and work performed by EBA.

County of Sonoma Los Guilicos Complex – Site Accessibility Improvements Sonoma County, CA
Design Period: July 2017 – October 2017
Construction Period: December 2019 – January 2020
Description of Services: Services provided included civil engineering services, topographic mapping, permitting
assistance, and construction administration for accessible parking and path of travel improvements for the public areas of the Los Guilicos Complex.

Improvement plans consisted of construction notes,
demolition plans, site improvement plan, and construction details sheet. The construction note sheet provide project specific general construction notes and specifications. The demolition plans provided exact limits of pavement and concrete removal while defining exact items to be preserved. The site improvement plan sheets provided grading and drainage improvements for accessible parking stalls, paths of travel connecting the parking stalls to the main entrance to the facility, curb ramps, and crosswalks. The detail sheet provided specific construction details including signing and striping improvements meeting accessibility improvements.

County of Sonoma
Central Sonoma Valley Trail – Trail/Pathway Design
Sonoma County, CA
Design Period: January 2015 – November 2016
Construction Period: July 2017 – April 2018
Description of Services: Services performed include civil engineering services for the design and permitting of 0.42 miles of Class I bike path between Larson Park and Flowery
Elementary School and along Verano Avenue between
Sonoma Creek and Main Street in the Springs Area of Sonoma County.

Improvements consisted of two segments of Class III bike trail, public roadway crossings, private driveway crossings,
installation of a pre-manufactured bridge, grading and
drainage improvements, site accessibility improvements, and public water. Services included topographic surveying,
preparation of easement descriptions, site improvement
design, permitting, and construction administration.

During the design and development of the Central Sonoma Valley Trail project, EBA provided civil engineering services for an adjacent project which include an additional 0.23 miles of Class III bike trail through Sonoma Springs Mixed-Use
Development project. Close coordination was provided
between the two projects to assure a safe and complete route for pedestrian and bicyclist in the area.

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
7 Meredith Pier Demolition
Sonoma County, California
Description of Services: EBA prepared design
drawings for the demolition of the Meredith Pier in
Bodega Bay, CA. Services performed include civil
engineering services for the design and permitting for
the demolition of the pier along with structural
inspection by Mr. Ken Hughes. EBA also is tasked with
construction oversite, sediment sampling, and ambient
air monitoring. Services also included topographic
surveying, preparation of site improvement design, and
construction administration.

County of Sonoma Russell Avenue Environmental Investigations Sonoma County, California
Description of Services: EBA has provided environmental engineering services for multiple projects located along Russell Avenue over the past 10 years. EBA was instrumental in the closure of the multiple sites along Russell Avenue by the NCRWQCB. Environmental consulting work included meeting with NCRWQCB staff prior to beginning construction of the new Fleet building. These include a PCHMA along the Russell Avenue improvements (Mike Volatile), a Soil and Groundwater Management Plan for the New Fleet building, soil characterization for the replacement of a gas line for the MADF, soil sampling as part of parking lot construction in 648 Russell Ave (Mike Volatile).

County of Sonoma Mason’s Marina Environmental Investigation & Remediation Project 1820 Westshore Road, Bodega Bay, California
Feasibility Study: 2016
Initial Site Investigation: 2016
Plans, Permitting & Specifications: 2017
Fuel Tank Removal & Remediation: 2018
Closure: 2022

Description of Services:

EBA was initially retained by the County to conduct a feasibility study for the upgrade of the fueling facility at the Mason’s Marina property in Bodega Bay. An initial site investigation was completed in 2016 that included the installation of soil borings for the purpose of characterizing soil and groundwater conditions. The investigation indicated that petroleum hydrocarbons and fuel related volatile organic compounds had been released to the environment and impacted soil and groundwater.

Plans and specifications were prepared for the removal of the fueling system and the remediation of soil impacts by excavation. The work scope was approved and overseen by the North Coast Regional Water Quality Control Board. Permitting for the project required a Coastal Development permit from the California Coastal Commission due to the proximity of the project within the Coastal Development Zone directly adjacent to Bodega Bay. EBA worked directly with the County to procure competitive bids for the removal of the fueling system and remediation activities. EBA then provided professional services for the project implementation including excavation oversight, regulatory agency liaison, and technical services including soil and groundwater sampling and reporting.

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
8 Sonoma County Junior College District - PCHMA – Haehl Pavilion Geothermal Wells Santa Rosa, California
Description of Services:

As part of the permitting process for drilling and installation of the geothermal heat exchange wells, the County of Sonoma Permit and Resource Management Department (PRMD) and North Coast Regional Water Quality Control Board (NCRWQCB) expressed concerns that the drilling process could pose possible cross contamination issues between historically documented shallow groundwater impacts (petroleum hydrocarbons and chlorinated solvents) and potential deeper water-bearing zones.

Based on this circumstance, the drilling permit process was suspended and SRJC contracted with EBA to assess PRMD’s and NCRWQCB’s concerns and to establish whether any modifications to the proposed geothermal heat exchanger installation protocols are necessary to minimize potential risks. EBA directed and oversaw the advancement of 12 Cone Penetrometer Technology (CPT) borings by Kehoe Testing and Engineering (Kehoe) from Huntington Beach, California. Based on the information collected during the investigation, the SRJC was able to continue with the installation of the Geothermal Wells.

SECTION III – STAFFING AND SUPPORT
EBA’s office is fully equipped with networked computer hardware and up-to-date software for data analysis and calculations, computer-aided drafting (CAD), document production, file management, and word processing. EBA has performed on-call and short-notice services for clients and EBA will provide the same dedicated availability to any project proposed by the Public Works Department. Due to EBA’s location of Santa Rosa, next-day availability for key personnel would be available for site visits. With that said, EBA operates a satellite office located in Eureka, a standard response time by backup personnel to a job site would be approximately three hours in the event of an emergency site visit were needed. EBA’s implementation of safety-oriented field operations is paramount to our success, EBA has a plethora of HAZWOPER certified personnel including four HAZWOPER Supervisors. EBA regularly contracts with a Certified Industrial Hygienist (CIH) on a myriad of projects to develop site specific Health & Safety Programs, including special handling of unexploded ordnances and hazardous soils, implementation of suppressive controls for fugitive dust emissions at construction/ demolition sites, employee inhalation risk monitoring, and human health risk assessments. Routinely, EBA’s HAZWOPER Supervisors are on-site implementing the Health & Safety Programs in a supervisory manner at hazardous material excavation sites, Landfills, and other engineering/environmental sites.

EBA is an organization that is equipped with a multitude of licensed in the fields of civil engineering (6 Professional Engineers) and environmental services (3 Certified Engineering Geologist, 3 Certified Hydrogeologist, 7 Professional Geologist, and 4 Registered Environmental Assessors) along with qualified support staff to provide the integral components for a spectrum of projects. In addition to EBA team, EBA has partnered with various specialist to assist in project completion. Below is a list of specialists whom EBA has partnered with:

STRUCTURAL ENGINEERING SERVICES ELECTRICAL ENGINEERING SERVICES Brokaw Design Brokaw Design
6060 Dawn Drive 6060 Dawn Drive
Rohnert Park, CA 94928 Rohnert Park, CA 94928
v m
i
t
- ::: :
^ -*
H -E!
f
i:z e

ENGINEERING

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
9 415.466.6666 707.827.3064
[email protected] [email protected]

CERTIFIED INDUSTRIAL HYGIENIST (CIH) HAZARDOUS MATERIALS TESTING Kevin Braun, CIH Bob Gerhold
Earth Safety Dynamics (ESD) Nor Bay Consulting
70 Rockrose Street 2400 Las Gallinas Avenue #110
Livermore, CA 94551 San Rafael, CA 94903
[email protected] [email protected]
SECTION IV – KEY PERSONNEL
EBA’s Project Team is comprised of individuals with extensive background and experience related to the civil and environmental engineering services. The Project Team members assigned to this project have been selected based on their prior, related experience to ensure a sound management structure and to provide effective supervision throughout each level of the project team. The following key employees will be assigned to this project and will primarily be responsible for overall management of the contract and services:
 Dale Solheim, P.E., LEED AP (Principal Engineer - 30+ years experience) o Elk Grove Special Waste Collection Center, Elk Grove, CA o Central Disposal Site Operational Improvements, Sonoma County, CA o Coyote Valley Shodakai Casino Site Improvements, Mendocino County, CA  Damon Morelli, P.E., LEED AP (Managing Engineer - 20+ years experience) o Los Guilocos Complex – Site Improvement – Sonoma County, CA o Central Sonoma Valley Trail – Sonoma County
o Twin Cities Police Administration, Larkspur, CA
 Matthew Earnshaw, P.G., C.E.G., C.Hg., QSD (Senior Geologist – 20+ years experience) o County of Sonoma – Multiple Sites – Sonoma County, CA o City of Santa Rosa – Multiple Sites – Santa Rosa, CA
o City of Ukiah – Multiple Sites, Ukiah, CA
 Matthew Machi, P.E. (Senior Engineer – 10+ years experience) o West County Transportation, Sonoma County, CA
o Larson Park Renovations, Sonoma County, CA
o FEMA Emergency Housing at Sonoma County Campground and Lake Mendocino, Sonoma and Mendocino, CA*
 David Noren, REA (Manager Environmental Services – 20+ years experience) o Phase 1 ESA – County of Sonoma, City of Santa Rosa
o CEQA, NEPA – City of Ukiah
o MS4 Stormwater Sampling – City of Santa Rosa
 Matt Kowalski, P.G. (Project Geologist – 10+ years experience) o City of Santa Rosa – Garage #9 UST remedial activities, Sonoma County, CA o Santa Rosa Junior College - Bertonelli Geothermal Field PCHMA o County of Sonoma New Courthouse Prisoner Tunnel PCHMA – Sonoma County, CA t N G I N t f c K I N G

CITY OF CRESCENT CITY

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
10 SECTION V – REFERENCES
As briefly detailed in the previous sections EBA has worked with numerous Cities and Counties on a wide range of engineering and environmental projects at government owned properties. Below are six references and brief descriptions of the scope of work provided to current and former clients.

Mr. Mike Volatile, County of Sonoma General Services Department, Facilities Development & Management Division (FDM)
Phone: 707.565.1975 E-mail: [email protected] Related Projects: Los Guilicos Complex –Site Accessibility Improvements; Russell Avenue PCHMA Environmental Investigation; Meredith Pier PCHMA and Demolition; Sonoma County Administration Complex Environmental UST Investigations & Remediation.

Mr. Ken Tam, Park Planner II, Sonoma County Regional Parks Department Phone: 707.565.3348 E-mail: [email protected]
Related Projects: Central Sonoma Valley Trail – Trail & Pathway Design; West County Trail – Forestville Trailhead; Joe Rodota Trail Bridge Replacement Project
Mr. Mark Cleveland, Sonoma County Parks Department
Phone: 310.430.2063 E-mail: [email protected]

Related Projects: Mason’s Marina Environmental Investigation & Remediation Project

Mr. David Liebman, Project Manager, Santa Rosa Junior College District Phone: 707.522.2836 E-mail: [email protected]

Related Projects: Haehl Pavilion Geothermal Wells; Emeritus Circle - Parking Lot Improvements; Quin Central Plant

Mr. Glen Morelli, Sonoma County Department of Transportation & Public Works Phone: 707.565-7947 Email: [email protected] Related Projects: Sonoma County Landfill Sampling & Reporting

Mr. Dave Hung, Senior Civil Engineer, City of Hayward, Department of Public Works Phone: 510.583.4752 E-mail: [email protected]
Related Projects: City of Hayward Airport PCHMA, City of Hayward Fire Station #6

ENGINEERING
Freshwater Environmental Services
Jon Olson March 16, 2022
Public Works Director
City of Crescent City
377 J Street
Crescent City, CA 95531
Subject: Transmittal of Qualifications for Environmental Support Services Response to RFQ No. 2022-01
Dear Mr. Olson:

Freshwater Environmental Services (FES) is a right-sized local environmental consulting firm with 15 years of experience assisting local municipalities maintain compliance for a broad range of regulatory requirements. FES provides clients with a broad range of environmental reports to meet specific regulatory deadlines and has developed institution-wide environmental compliance programs.

FES is a California S-Corporation and has provided compliance support services to the City of Crescent City for 15 years and is enthusiastic to continue providing a high level of responsiveness and a broad range of expertise. FES meets the minimum insurance requirements outlined in Crescent City Professional Services Agreement Standard 2018.

FES has an office located in Areata, California:

Freshwater Environmental Services
78 Sunny Brae Center
Areata, California
Orrin Plocher, CFO, is authorized to represent the firm and is able to bind the firm to all commitments made in the proposal and will serve as FES’s Project Manager. Orrin Plocher can be contacted at:

Freshwater Environmental Services
78 Sunny Brae Center
Areata, California
(707) 498-9071 (24-hour)
[email protected]
Thank you for your consideration of Freshwater Environmental Services. Please do not hesitate to contact the undersigned with any questions about the attached qualifications (707 498-9071).

Sincerely,
Freshwater Environmental Services
Ofyv
^
- Orrin Plocher
CFO/Project Manager
78 SUNNY BRAE CENTER * ARCATA, CA 95521 * OFFICE (707) 839-0091 STATEMENT of QUALIFICATIONS
To Provide
Engineering, Planning, Environmental
Architectural and Related Support Services
j
RFQ No. 2022-01
Prepared for:

Public Works Department
City of Crescent City
377 J Street
Crescent City, California 95531
March 2022
Prepared by:

Orrin Plocher, Stan Thiesen, and Scott Ferriman
of
Freshwater Environmental Services
78 Sunny Brae Center
Areata, California 95521
Phone (707) 839-0091
Freshwater Environmental Services
Statement of Qualifications

PART I ORGANIZATION OF FIRM

1. Freshwater Environmental Services is a California S-Corporation with the following shareholders and percent ownership:

33.3%;

33.3%; and

33.3%.

Orrin Plocher
Stan Thiesen
Scott Ferriman
FES has no outside debt and is not affiliated with any other company or organization.

2. FES consists of three professional staff including:

Stan Thiesen, California Professional Geologist (Project Manager); Orrin Plocher, (Project Manager, Compliance Specialist); and Scott Ferriman, (Project Manager).

FES has been in business since 2007 and all work for this project will be performed at our office at 78 Sunny Brae Center, Areata, California 95521 and at City of Crescent City offices.

3. FES is not proposing a joint venture for this RFQ. Management responsibility, quality control design, and production coordination will be performed by FES. l

PART II RELATED WORK EXPERIENCE AND QUALIFICATIONS
The following sections include brief descriptions of applicable projects in water and wastewater.

With very few exceptions, the projects listed below were complete within approved budgets and regulatory deadlines.

Regulatory Compliance Management
FES has developed and implemented a regulatory compliance database with over 700 compliance activities over 5 years to aid Crescent City maintain compliance with numerous regulatory programs Including the following categories:
2017 NPDES Permit for WWTP Drinking Water
Pretreatment Hazardous Materials
OSHA State Lands Commission
America's Infrastructure Act Backflow Prevention
Water Rights Lab- Compliance
PFAS Stormwater
FES prepares monthly compliance activities reports for Crescent City staff as reminders of upcoming compliance activities. This system is one way of assuring regulatory compliance consistency even with changes in staffing. The entire database is uploaded to Crescent City on a quarterly basis. The database was developed to be easily used by FES or City Staff. One goal of the system is to preserve institutional knowledge between transitions of City staff or consultants.

FES has developed compliance management tools for tracking FOG activities and for tracking Significant Industrial Users. Database systems are currently being implemented and are kept up to date by City staff. Data systems allow for prioritizing inspections and stores data from individual compliance inspections. Reporting allows the pretreatment inspector to review site details and inspection histories/notes from individual sites which aids in preparing for upcoming site inspections.

FES is currently developing a Backflow Prevention tracking and reporting system that will consolidate historic test results, device photos, and records into a single database, generate mail-merge tables for notice letters, and allow for reporting program progress to regulators.

These compliance management systems are designed to demonstrate program progress and compliance to State and Federal regulators and prevents the loss of institutional knowledge during staff, consultant, and regulator transitions. These programs are intended to outlive individual staff, consultants, and regulators.

Regulatory Report Preparation
FES has experience in preparing regulatory reports for municipal and other regulated clients.

FES has prepared Annual MWELO reports, Annual Electronic Reports, and Annual Water Rights Reports for the City of Crescent City qnd others. Additional examples of regulatory reporting for various programs is included in the sections below. 2 Sanitary Sewer Management Planning
FES has facilitated planning processes with several agencies to develop Sanitary Sewer Management Plans (SSMP), periodic SSMP audits (every 2-years), and SSMP updates (every 5-years).

During the SSMP process, FES has developed several Fats Oils and Grease (FOG) programs, Overflow Emergency Response Plans (OERP), and drafted revisions/additions to Sewer Use Ordinances (SUO). Agencies that FES has provided SSMP services include:

City of Crescent City City of Eureka
McKinleyville Community Services District City of Fortuna Humboldt State University College of the Redwoods
City of Rio Dell Bear River Band of Rohnerville Rancheria Del Norte County CSA Palmer Creek Community Services District City of Fort Bragg
Urban Water Management Planning
FES used existing data and reports provided by several municipal clients to complete the 2010, 2015, and 2020 Urban Water Management Plans (UWMPs).

FES has prepared UWMPs for the following list of clients:

City of Crescent City City of Fortuna
Humboldt Community Services District City of Eureka
McKinleyville Community Services District
AWWA Water Loss Audits
FES has prepared AWWA Water Loss Audits for local municipalities since 2010. AWWA Water Loss Audits are now required annually and quantify non-revenue water and calculate standard metrics useful for comparing to previous audits and for comparing to other municipalities. Each data entry is assigned a data quality grade which result in a cumulative water audit data validity score. The audit process provides recommendations for increasing each data grade which results in system refinements. FES reviews historic water loss audit with a data compiler that tabulates results for easy year to year comparisons and for identifying multi-year trends.

Several water audits performed by FES have resulted in the identification of significant water losses with resulting programs to reduce non-revenue water. FES has prepared AWWA Water Audits for the following list of clients:

City of Crescent City City of Fortuna
Humboldt Community Services District City of Eureka
McKinleyville Community Services District City of Fort Bragg Local Limits Workplah bevelopment and Implementation
FES has prepared workplans for development of technically based Local Limits for several clients. Local Limits Workplans follow a specific EPA methodology to determine pollutants of concern, and sampling methodologies. FES has prepared Local Limits analysis based on site specific sampling results utilizing the Maximum Allowable Headworks Loading (MAHL) methodology and assisted municipalities with the implementation of revised local limits. FES has performed Local Limits assessments for the following agencies:
3 City of Crescent City City of Eureka
McKinleyville Community Services District
Initial Industrial Waste Surveys to Identify Industrial Dischargers Initial Industrial Waste Surveys review current commercial dischargers and determining which dischargers warrant a site inspection to determine if they should be classified as an Industrial User (IU), Significant Industrial Users (SUI), or Federal Categorical discharger. FES has performed initial and updated surveys for municipalities to comply with pretreatment standards.

FES has performed Industrial Waste Surveys for the following agencies:

City of Crescent City City of Fort Bragg
McKinleyville Community Services District City of Fortuna Water Shortage Contingency Planning
FES has prepared and updated Water Shortage Contingency Plans to meet current State standards. Some plans were prepared in response to State-wide drought conditions and emergency draft regulations. FES has preformed Water Shortage Contingency Planning services for the following agencies:

City of Crescent City City of Fort Bragg
McKinleyville Community Services District City of Fortuna Yurok Tribe Humboldt Community Services District
City of Rio Dell
Amendments to Sewer Use Ordinances
FES has assisted several agencies update their Sewer Use Ordinances to better protect their sewer collection system, employees, and treatment works. Updates to general prohibitions, discharge permits, and enforcement authority are often necessary to meet the EPA model ordinance. Several north coast clients have added lateral inspection/correction requirements at the time of property transfers and several other triggers. Lateral inspection/correction requirements are an additional method for controlling excessive inflow and infiltration. FES has worked on ordinances for the following entities:

City of Crescent City City of Fort Bragg
McKinleyville Community Services District City of Fortuna City of Ferndale Yurok Tribe
Humboldt Community Services District City of Rio Dell
Industrial User Inspections/Documentation and Enforcement Support FES has supported several agencies by performing and documenting inspections of industrial discharges and dischargers of FOG. When violations are identified FES has provided documentation and support to the municipality to take the necessary enforcement actions. FES has developed a database application to accumulate data from inspections and aid in scheduling inspections.

Database tools are used to store detailed site information, accumulate inspection observations, and generate summary reports for the annual pretreatment report. FES has performed inspections of wastewater dischargers for the following municipalities:
4 City of Crescent City City of Fort Bragg
City of Fortuna
IU Discharge Permit Development
FES has developed and modified existing wastewater discharge permits for several municipalities. Discharge permits with applicable limits, best management practices, and monitoring/reporting requirements are essential for communicating the requirements and responsibilities to dischargers. Discharge permits are the result of a constructive dialogue between a Wastewater Treatment Plant (WWTP) and a discharger where both parties become educated in the needs of the other.

Enforcement Response Plan Development
FES has developed several Enforcement Response Plans (ERPs) for municipalities to guide staff on enforcement procedure, triggers, and appropriate, reasonable, uniform response. ERPs guide the enforcement authority granted by Sewer Use Ordinances. FES has prepared ERPs for the following entities:

City of Crescent City McKinleyville Community Services District City of Fortuna Yurok Tribe;
City of Rio Dell Humboldt State University
Hauled Waste Program Development
FES has assisted municipalities develop hauled waste programs including developing a process, application, and discharge permit for receipt of hauled wastewater from various sites.

The process defined wastewater testing requirements and discharge limitations that are consistent with the local Sewer Use Ordinances, Regional Water Quality Control Board requirements, and the existing National Pollution Discharge Elimination System (NDPES) permit requirements.

City of Crescent City City of Fort Bragg
City of Ferndale
Grant Proposal Preparation and Support
FES has a successful track record of preparing grant proposal for clients. Successful Grants include funding from various sources including:

US Environmental Protection Agency (EPA); Deployment of Energy (DOE); Bureau of Reclamation (BOR) Bureau of Indian Affairs
North Coast Resource Partnership (NCRP) Prop 84
Statewide Water Conservation Regulations Support/Drought Support FES supported several agencies respond to the State drought requirements. This included preparation and amending water shortage contingency plans, modification to municipal codes, and preparation of staff reports associated with the various drought stages and the impacts on local water users. Although north coast water providers were not usually impacted by drought conditions or water shortages, they are still required to respond appropriately to the State mandates.
5 PART III STAFFING AND SUPPORT
FES has the following resources available to perform Scope of Services set forth in this RFQ:
o Three Project Managers (over 45 years cumulative consulting experience); and o GIS software and a large format printer.

Staff is generally available during off hours with a 1.5 to 2-hour response time to Crescent City with an additional 0.5 to 1 hours to remote infrastructure in the event of an emergency.

FES will adhere to facility site safety and access rules when performing work onsite including mandatory Personal Protective Equipment (PPE) including hardhats, safety glasses and protective footwear. FES staff are 40-hour OSHA certified with annual 8-hour OSHA refresher training.
6 PART IV KEY PERSONNEL
Key personnel assigned to provide support include:

Orrin Plocher (Project Manager) - Primary client contact responsible for project planning, budget, and schedule. Mr. Plocher will be responsible for performing a majority of the technical services anticipated under this contract including regulatory research, compliance strategy development, regulatory response, permitting, program development, preparation of various reports and compliance documents, and grant proposal assistance for project funding. Mr. Plocher will also provide professional services during the bid process on projects as necessary. Mr. Plocher will responsible for preparation of periodic progress reports and meetings with City Staff, and processing of invoices for services.

Mr. Plocher has been providing Regulatory Compliance Services to the City of Crescent City for over 10 years as well providing services to other clients under various and broad regulatory frameworks for the past 20 years. In the past 15 years Mr. Plocher has focused on providing regulatory support services to municipal water and sewer providers.
7 PART V REFERENCES
FES is providing the following references for our key personnel.

Orrin Plocher
Eric Wier, City of Crescent City, (City Manager), (707) 464-7483 [email protected]
Randy Jensen, City of Rio Dell, (Water Superintendent), (707) 764-3541 [email protected]
Jesse Willor, P.E. City of Eureka (City Engineer, Public Works), (707) 441-4031 [email protected]
Michael Hansen, City of Eureka (Deputy Director of Public Works Utility Operations) (707) 441-4360, [email protected]
John Smith, City of Fort Bragg, (Assistant Director Public Works), (707) 961-2823 x136 [email protected]
8 RFQ: To Provide Engineering, Planning,
Environmental, Architectural & Related
Support Services
PREPARED BY:

Krista Harper
Vice President
1240 E. Ontario Ave.

Corona, CA 92881
PRESENTED TO:

City of Crescent City
ATTN: Jon Olson
Public Works Department
377 J Street
Crescent City, CA 95531
March 18, 2022

HARPER & ASSOCIATES
ENGINEERING, INC.

HARPER & ASSOCIATES
ENGINEERING INC.

JUNE 5, 2020

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 1
T
A
B
L
E
O
F
C
O
N
T
E
N
T
S
I. INTRODUCTION
Cover Letter
Executive Summary
Firm Information
2 3
5 8
6 7
17 III. SCOPE OF WORK
Scope of Work
II. PROJECT TEAM
Organization Chart
Project Team
IV. REFERENCES
References
V. APPENDIX
Resumes
Addendum
Thank you for the opportunity to submit the following comprehensive RFQ to provide Engineering, Planning, Environmental, Architectural & Related Support Services. The Statement of Qualifications (SOQ) was prepared based on receipt and review of the RFQ. HAE is sending this SOQ to provide civil and corrosion engineering and related support services. We are confident our firm offers City of Crescent City an exceptional opportunity to take advantage of our corrosion and civil engineering services with an outstanding array of technical talent and expertise.

The cost estimate, terms, and conditions of this Proposal are valid for ninety (90) days from receipt of Proposal. I certify that I meet the minimum requirements of this RFQ. HAE will provide and maintain in full force and effect, while operating under an agreement with the City, a Comprehensive Liability insurance policy which shall include bodily injury and property damage coverage of $4,000,000 combined single limit, Automobile Liability insurance with limits of $2,000,000, Worker's Compensation insurance with limits of coverage as prescribed by law, and an Errors and Omissions Professional Liability policy with a minimum limit of coverage of $2,000,000. The insurance certificates will state "City of Crescent City is an additional insured."
Please contact me at our office at 1240 E. Ontario Avenue, Suite 102, Corona, CA 92881 or (951) 372-9196, via FAX at (951) 372- 9198, or e-mail at [email protected] regarding contract negotiations, binding the contract, any questions, or if additional information is required.

Respectfully submitted,
HARPER & ASSOCIATES ENGINEERING, INC.

Krista Harper, P.E.

Vice President
PAGE 2

HARPER & ASSOCIATES
ENGINEERING INC.

JUNE 5, 2020

COVER LETTER
www.harpereng.com Page 2

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 3
Harper & Associates Engineering, Inc. (HAE) is a corrosion and tank structural consulting engineering firm specializing in water reservoirs and related facilities, operating since 1979. HAE would be considered a small business in comparison to many larger firms, but the decision was made early on to be a small firm that specializes in this unique field of engineering. The desire is to provide our clients with exceptional knowledge, high quality workmanship, and personalized service on all projects. The fact that HAE has successfully specialized in this unique field for over 40 years speaks well of the firm’s reputation in the industry, integrity, financial stability, and resources to successfully accomplish projects.

As a firm that specializes in services for water storage tanks, we can provide turnkey projects for our clients from the initial evaluation and detailed report, to preparation of comprehensive technical specifications and plans, bid documents, and customized bidding and construction assistance, and finish the project with quality control inspection. The following are advantages which distinguish HAE from other engineering firms.

HAE can accomplish evaluations by drained, dive, and float methods. These evaluations have helped our team develop expertise regarding coatings in tanks, their modes of failure, and the corrosion related structural damage caused by coating failures. Our team has also developed a thorough knowledge of the Cal/OSHA regulations, seismic regulations, and AWWA standards needed to bring a tank into compliance with current codes. By having our own diving crew led by an engineer, we can guarantee our evaluations are thorough and all aspects of tank rehabilitation are carefully considered.
40 years ofspecialty experience

EXECUTIVE SUMMARY

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 4
HAE has developed the most comprehensive technical specifications in the water industry for coating and painting of tanks. Our specifications have been expanded to specifically address the areas within the tank where the coatings are most prone to failure. The specifications for the project will conform to the City format and include City's new specification sections, but will still be comprehensive and specifically address the areas within the tank where the coatings are most prone to failure.

HAE can provide our clients with lower engineering costs for their projects. Our knowledge, comprehensive technical specifications and plans, and customized bidding and construction assistance have been created in a way that is more productive, as we are not spending hours researching means and methods for each individual project. HAE’s vast experience in this industry has also enabled us to provide each client with quick and efficient review of submittals, procedures, and RFI’s, which keep sour management costs down. In addition, because of our efficient services, progress meetings are kept to a minimum, which saves the client's personnel time to work on other pressing matters.

In 1979, HAE was the first engineering firm in Southern California to provide full-time quality control coating and paint inspection. In addition, our founder, William Harper, was a member of the original committee that formulated the NACE coating inspection program and testing. Since HAE was founded we have been diligent in hiring highly qualified inspectors. Our inspectors not only have NACE certifications, but have field experience in coating and painting with many of our inspectors being either past foremen or superintendents for coating contractors.

HAE is currently providing engineering services to the City of Crescent City for the Amador and Washington Tanks. HAE prepared the specifications and plans for the Amador rehabilitation project and provided the bidding and construction assistance and quality control inspection for the first phase of the project. Currently, HAE is preparing the specifications and plans for the Washington Tank rehabilitation project. Based on these projects, HAE is very familiar with City's operations and procedures.

As can be seen in the references provided, many clients have used our engineering services exclusively for their tank projects for many decades. We believe our long-standing service to a variety of public agencies throughout California, many on a continuous basis throughout our 42 years in business, is a testimonial to the quality of services we provide. We encourage the City to confer with any of the references. The primary assurance is the fact that all work will be done by highly qualified and experienced engineers with an outstanding array of technical talent and expertise and who are uniquely familiar with water tank projects.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 5
Harper & Associates Engineering, Inc. (HAE) is a corporation that has been operating since 1979. Our office is located at 1240 E. Ontario Ave., Suite 102, Corona CA 92881. HAE currently has 16 employees. Our personnel include two (2) registered professional engineers, three (3) non-registered engineers, two (2) engineer technicians, and seven (7) seven quality control inspectors. HAE's engineering staff has been active members of the American Water Works Association and National Association of Corrosion Engineers since the inception of the firm. The following are the owners and officers of the corporation and their resumes are included in the Appendix portion of this comprehensive Statement of Qualifications.

Andre Harper President
Krista Harper Vice President

FIRM INFORMATION

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

ORGANIZATION
CHART
The following personnel will be the
team for the City project. Detailed
qualifications are referenced in the
Resumes.
www.harpereng.com Page 6
Coating
Inspector

PARKERBROWN

SSPCPCIII
Owner
CITYOF

CRESCENTCITY
Principal
Engineer/Vice
President
KRISTA
HARPER, P.E.

President
Engineer/Diver

ANDRE HARPER

NACE III
Project
Engineer/Diver

ALEXIS AYALA
NACE I
Cathodic
Protection
Engineer
STEVE
JONES, P.E.

Engineering
Technician/
Diver

BRANDON
BAXTER

NACE II
Coating
Inspector
DENNIS

PAZMINO

NACE III
Coating
Inspector

BEN OLMSTEAD

NACE II
Coating
Inspector

RANDY POWERS
NACE I
Coating
Inspector

PARKERBROWN

SSPCPCIII
Coating
Inspector

ALEXROMERO

NACE II
Coating
Inspector

FRED VALENCIA
NACE I
Project
Engineer/Diver

JAKOB HARPER
NACE I
Structural
Emgineer

GUYKELSEY,
P.E., S.E.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
a year's overview
www.harpereng.com Page 7
Krista Harper, P.E., Principal Engineer
Ms. Harper, as Principal Engineer, will be responsible for QA/QC and will be the Project Manager.

Ms. Harper is a Registered Civil Engineer in the State of California (C71280). For over 25 years, Ms.

Harper has been Senior Project Manager for HAE, working extensively in both corrosion and structural engineering projects, primarily related to steel and concrete tank evaluations and rehabilitation.

Andre Harper, President and Lead Diver
Mr. Harper will accomplish the field evaluation of the reservoirs and prepare specifications. Mr.

Harper holds a degree in engineering from California State Polytechnic University, Pomona, and is NACE Level III certified (55395). Mr. Harper has worked with HAE for over 25 years, performing the diving inspections of hundreds of tanks for the evaluation of coating, painting, and seismic/structural projects. Mr. Harper is a Project Engineer for HAE and supervises all field operations for the firm.

Alexis Ayala, Project Engineer and Diver
Mr. Ayala will be the Project Engineer who will assist with the field inspections and preparing plans and specifications. Mr. Ayala holds a degree in engineering from California State University, Fullerton, and has worked with HAE for three years. Mr. Ayala is bilingual in Spanish and English, both written and oral.

Steve Jones, P.E. Cathodic Protection Engineer
Mr. Jones is a Registered Corrosion Engineer (CR 298) and NACE Certified Corrosion Specialist (2134) with over 50 years of experience. Mr. Jones will be responsible for the evaluation of the existing cathodic protection systems and cathodic protection design. Mr. Jones has been the Cathodic Protection Engineer for HAE for 30 years.

Guy kelsey, P.E., S.E. Structural engineer
Mr. Kelsey has over 10 years of experience in structural engineering, designing both new and retrofit projects for various types of structures including infrastructure, military, commercial, and water/wastewater. Mr. Kelsey has performed extensive seismic analysis, evaluation and condition assessments for existing buildings, infrastructure, military and water/wastewater structures throughout California.

PROJECT TEAM

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
"It has been the mission of HAE to provide ourclients with professional, innovative, and realistic guidance and services always."
www.harpereng.com Page 8

SCOPE OF WORK

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

PRELIMINARY ENGINEERING

SERVICES

1. Telephone conference or virtual meeting with the City to verify approach to project.

2. Review all available reports, record drawings, and photographs of the tanks to determine the condition of the tanks and recommend scope of work for rehabilitation of each tank.

3. Field evaluation of tanks to visually inspect and gather measurements to compile additional information needed to recommend the scope of work would entail dive, float, or exterior inspection methods depending on the information needed. It would be necessary to have the water level 3 to 4 feet below the roof line for dive and float inspections. During the field evaluation, the safety and health code violations will be determined.
a. Corrosion-related structural soundness of the tank, including roof structure, welds, etc.
b. Condition of protective coating and paint; how they are protecting the steel from corrosion, their aesthetic qualities, the percent failures, and their ability to be recoated
c. Environmental and operating conditions which affect the use of the reservoir, maintenance of the reservoir, the aggressiveness of the atmosphere and water, and extent of abrasion damage d. Condition of appurtenances: float, overflow, inlet, ladders, vents, etc.
e. Observe and note structural, safety, and health code violations per DOHS, Cal/OSHA, and AWWA requirements

4. Surfaces would be photographed and entered into a Photographic Survey.
www.harpereng.com Page 9

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

5. Recommendations and cost estimates for the scope of work for rehabilitation of the tank would be prepared and included in the report.

6. Two hard copies and a pdf of the report will be submitted.

7. The following sanitary measures will be fully complied with in accordance with AWWA C652-92, Section 5.
a. Diver's equipment is dedicated for use only in potable water storage tanks. b. No body parts shall come in contact with potable water. i. Diver's suit shall be prophylactic in design. Only non-permeable dry-suits shall be used which incorporate an integrated hard helmet, neck and wrist dams, and boots. ii. Wet suits, hoods, and open or removable masks and face plates are not acceptable for use in potable water.

LABORATORY ANALYSES

1. Remove three (3) samples of interior coating and (2) two samples of exterior paint from the tank to determine if they contain lead, chromium compounds, or zinc as required by Title 22. This removal operation would transpire during the investigation of the tank.

2. A detailed section in the report would be formulated, noting levels of specific heavy metals, and relating this information to the methods of removal, protection of workers and environment, testing of removed coating and spent abrasive for heavy metal content, and determination of wastes as hazardous materials, including disposal methods and operations.

CLEANING OF POTABLE WATER RESERVOIRS

1. Interior vacuuming utilizing certified divers/engineers shall include bottom surfaces, columns, column bases, appurtenances, and shell, as needed.

2. HAE shall assist the City personnel in containing silt for disposal, but City shall be responsible for containment and disposal.

3. Sanitary measures will be fully complied with as noted above. www.harpereng.com Page 10

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

STRUCTURAL/SEISMIC EVALUATION
The objective of this item is to determine the condition of the tank for seismic and structural reliability, related operating parameters, safety and sanitary compliance, and to recommend corrective and preventive measures, including filing a report. Stress calculations will verify whether existing static conditions meet current tank standards. All seismic design load calculations will be based upon seismic Zone 4, as set forth in AWWA Standard D100.

1. Accomplish review of all available records for the tank.

2. Field investigation of the tank would be accomplished during the inspection noted above to verify measurements, physical conditions, and other information to assist in seismic stress load calculations and structural evaluations. Investigation would include the following. a. Steel plate and component thicknesses for calculation purposes would be determined by measurement with an ultrasonic thickness gauge.
b. Evaluate condition of inlet and outlet piping and appurtenances and their relationship to a seismic event.
c. Evaluate condition of foundation as far as is visible above ground.

3. Specific conditions would be noted and included in the written report.

4. Interior and exterior surfaces would have been photographed during the corrosion protection investigation and entered into a Photographic Survey, which would be included as a reference point.

5. The convective and impulsive design accelerations will be calculated from seismic design parameters provided in the USGS Design Maps Summary Report for the site. Freeboard and sloshing wave period will be calculated from the above-noted seismic design parameters and the AWWA D100-11 Standard.
a. A geotechnical study is not included as part of this SOQ. If a geotechnical study is required, this work should be accomplished by a reputable geotechnical consultant.

6. Conclusions, recommendations, and cost estimates, based on field observations, measurements, available drawings and records, and Corrosion Reports, would be prepared and included in a Condition Assessment Report. The report would include recommendations for structural modifications or replacements to bring the tank into compliance with current codes and standards. www.harpereng.com Page 11

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

PREPARATION OF SPECIFICATIONS, PLANS, AND PROJECT COST ESTIMATE The objective of this item is to prepare detailed technical specifications and plans for the rehabilitation of the tanks to bring them into compliance with current codes and standards. HAE has prepared technical specifications and plans for over 40 years and has comprehensive specifications which thoroughly address all items noted in RFP.

1. Kickoff meeting with the City to verify the scope of work, based on utilizing corrosion report, previous reports, and estimated costs to accomplish the work.

2. Accomplish site visit to gather needed measurements and information for preparation of specifications and plans.

3. Prepare technical specification covering interior coating and exterior painting for the reservoir.

4. Prepare technical specifications and CAD drawings for structural, safety and health upgrades.

Drawings to be accomplished in AUTOCAD.

5. Prepare a bid package, including all City Boiler Plate documents, Technical Specifications, and General and Special Provisions.

6. Furnish the City with a cost estimate for the project in accordance with the bid schedule generated.

7. Submit documents to City Water Division Engineering Staff for 90% review. Telephone conference with the City to discuss revisions and accomplish all revisions determined necessary.

8. Submit four (4) signed and stamped copies of documents to City Water Division Engineering Staff for 100% review.

9. Upon final approval, HAE shall furnish a CD, stamped and signed construction plans, specifications, and bid documents.

7. It is noted that upgrading the tank does not guarantee an indestructible structure. Design, etc., should be based on water industry and existing AWWA Standards and UBC, which provide a costeffective design to bring the tank in line with an 80 year experience on the performance of tanks during earthquakes for specific zones.

8. Seismic recommendations will include general site risk assessments. www.harpereng.com Page 12
The objective of this item is to prepare specifications and plans for a sacrificial cathodic protection system to protect the steel surfaces in the submerged surfaces where minor defects develop over time in the new coating system.

1. Prepare technical specifications covering installations of a sacrificial cathodic protection system. Design will consist of all material and installation instructions required to provide the complete cathodic protection system.

2. Prepare technical CAD drawings covering the new cathodic protection system for the tank.

The plans will contain plan and elevation views and details.

3. Plans and specifications shall be submitted in accordance with Task No. 1 contract documents noted above.

BIDDING AND AWARD ASSISTANCE
The objective of this item is to assist the City during the bidding phase of the project to provide thorough bid documents so qualified contractors can prepare competitive bids for the project.

1. Furnish the City with a list of four or more potential bidders to forward Notice Inviting Bids to qualified contractors.

2. Provide telephone and email liaison with the City and potential bidders as regards to all matters concerning bidding of the project. Upon approval of the City, prepare an distribute addenda as required to document design changes or clarifications.

3. Assist the City in conducting MANDATORY Pre-Bid Conference for the project to ensure prospective bidders fully comprehend the scope of work and local conditions. Prepare agenda for meeting. Prepare minutes for the Pre-Bid Conference covering all aspects of contractor's questions and clarifications of the project which would be distributed to all attendees and become part of the contract documentation within (3) days of the meeting.

4. Assist the City in evaluation of bids received and interviewing contractors and make recommendations for award or rejection.

5. Assist City, as required, in preparation of contracts and documents to enable project to be awarded and implemented.

CATHODIC PROTECTION SYSTEM

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 13

CONSTRUCTION ASSISTANCE
The objective of this item is to assist the City in the overall coordination, planning, and management of the rehabilitation project. HAE's project manager will respond to RFI's, prepare change orders, conduct progress meetings, and oversee field inspection to assure the project is completed in accordance with specifications and plans. HAE's proactive approach to project management assures the project stays on time and within budget by troubleshooting and resolving issues before they impact the project.

1. Plan, coordinate, and manage the project in order to achieve project goals within the approved budget and schedule.

2. Determine which agencies will be involved in the project and establish and coordinate communication procedures among all participants. Effectively communicate project status via email, written correspondence, phone, and meetings.

3. Work closely with the City engineering and operations staff.

4. Assist the City in conducting Pre-Construction Conference to enable all relevant parties to comprehend the scope of the project, implementation of specifications, and City requirements.

Prepare agenda for meeting. Prepare minutes of Pre-Construction Conference covering all aspects of Contractor's questions and clarifications of the project and present to all parties within three (3) days of the meeting.

5. Participate weekly meetings as requested by the City.Record the minutes of all meetings and submit a copy of the minutes to the City within three (3) working days after each meeting.

6. Provide the QA/QC for the project and review all major deliverables before delivered to the City.

Maintain regular communication with City staff to confirm the major content of deliverables prior to submitting.

7. Assist the City in the review and approval of Contractor schedule of values, project submittals, and project procedures for coating, painting, and safety modifications. Rejected submittals would be supplemented with an explanation of the reason for rejection and requirements for re-submittal.

Maintain a log of the submittal status and distribute the submittals to the Contractor and City throughout the project.

8. Review the Contractor’s critical path method (CPM) schedule and monitor updates on a weekly basis.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 14

GENERAL INSPECTION SERVICES
Pictures shall be taken at key points in the project documenting the progress of the work.

Daily inspection reports, including diagrams of the coating work accomplished, shall be submitted to the Company.

The objective of this item is to provide management services which will help guarantee the project is completed in accordance with the specifications and plans and to expedite the services as to not impact the project schedule. As a firm that specializes in tank rehabilitation, HAE has a thorough understanding of the management required to provide a successful project.

1. Inspection Activity Reports - Shall identify daily start and stop times, size of Contractor’s crew, equipment used, visitors to job site, climatic conditions throughout the day, quantity of materials used, work accomplished, periods of Contractor down time and cause, inspection procedures used and results, verification and recording of surface preparation, coating material “batch numbers”, mixing, thinning, application, and thickness. All entries shall be dated and timed.

9. Provide telephone liaison with Contractor regarding requests for information (RFI’s) and/or request for clarification (RFC) for the project and prepare response, as required. Prepare supplementary sketches and details, as required, to resolve field construction problems that may be encountered. Develop project alternatives and resolution to issues in a timely manner.

10. Review all Contractor invoices, inspection reports, and inspector estimates of percent completion and make recommendations to the City for payment to Contractor as appropriate.

11. Resolve conflict in plans and specifications and prepare change orders as needed. The modifications communicated by change order would be fully documented with drawings, sketches, and/or written descriptions of the work required.

12. Assist the City in final acceptance of the project upon completion of all work by the Contractor.

Prepare a punch list of items during the final project walk for the Contractor to complete.

13. Assist the City in outreach to the public when determined necessary for the project.

14. Verify and log the Contractor has secured the required permits, bonds, insurance(s), labor affidavits, releases, and waivers throughout construction.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
Weather conditions will be verified by use of an electronic or sling psychrometer to determine suitability of climatic conditions.

Surfaces will be observed to determine compliance with specifications.

Preliminary Cleaning - For Steel Surfaces
Surfaces will be inspected to verify removal of grease, oil, chemicals, etc. after completion of solvent cleaning of surfaces.

Inspect blasted surfaces at the end of each day's shift to determine compliance with specification. Physical tests for surface profile will be performed using a KT Surface Profile Comparator. At completion of blast cleaning each shift, areas not meeting specification will be re-blasted and tests again performed. This cycle will be repeated until surfaces are accepted for material application.

Upon completion of above inspection, dust and other surface contaminants will be removed as specified and surfaces visually and physically inspected for compliance with specification.

2. Notify the Company if out-of-scope work is required prior to the Contractor performing the work.

3. Observe the Contractor for compliance with site and job safety requirements. Inform the Company of any concerns or problems concerning site or job safety observed. Direct the Contractor to comply with all safety orders.

4. Observe and note all deliveries of materials with respect to the Contractor’s conformance to the contract documents and shop drawings.

5. Perform as needed inspection of structural and safety modifications and piping work performed on the reservoir for compliance with the specifications and plans and perform a visual inspection of new welds.

6. SURFACE PREPARATION INSPECTION - Physical inspection of blast cleaned surfaces to verify compliance with specification, removal of dust, etc. a.
i.
b.
i.
ii. Abrasive Blast Cleaning
www.harpereng.com Page 15

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
www.harpereng.com Page 16
Weather conditions will be verified by use of an electronic or sling psychrometer to determine suitability of climatic conditions.

Contractor's equipment will be monitored to ensure operation will not contribute to any degradation of application (oil, moisture, etc.).

Applied materials will be inspected for compliance with specification and mixing/thinning operations will be monitored.

Surfaces will be re-inspected to verify no dust or other contaminants are on surfaces and remedial cleaning performed as required.

After approval of surfaces, application will be carefully monitored to verify materials are evenly applied at the proper thickness and with no overspray to interfere with adhesion.

7. MATERIALS APPLICATION INSPECTION - After approval of surface preparation, ongoing inspection monitors weather conditions, Contractor's application equipment and its operation, mixing of primer, and physical inspection of prime coat application, including spray techniques, cleanliness of surface, thickness, etc.

8. FINISH COAT(S) INSPECTION - After approval of prime coat application, ongoing inspection monitors weather conditions, Contractor's application equipment and its operation, mixing of materials, and physical inspection of material application, including spray techniques, cleanliness of surface, thickness, etc.
a. Procedures outlined in 3. above will be repeated during application of additional materials, including careful examination of areas where cleaning penetrated coating film to verify edges of film have not lifted, curled, etc. Where defects exist, additional cleaning will be performed to bring area into compliance with specification and area will be recoated as required.

9. FINAL INSPECTION - Requires input at conclusion of finish coatings to ensure application, film continuity (holiday detection), and dry film thickness are in complete conformance with specification.
a. DRY FILM THICKNESS TESTING
i. Prior to testing dry film thickness on any given day, inspector will calibrate his instrument against N.B.S. metal plate standard. No plastic shims will be used.

Instrument will be re-calibrated at the beginning of the afternoon session or at any time the instrument may have been subjected to impact against scaffold, structure, etc.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
a year's overview
www.harpereng.com Page 17

REFERENCES
Projects have included dive investigation of all reservoirs, including dive inspection of the interiors for seismic/structural and corrosion protection; testing for lead and heavy metals; preparation of reports with recommendations and cost estimates; preparation of a priority list, technical specifications, and bid packages. Project management and quality control have been provided for 12 of the reservoir rehabilitation projects.

CRESCENTA VALLEY

WATER DISTRICT
CLIENT SINCE: 1997
MR. DAVIDGOULD
2700 FOOTHILLBOULEVARD
LACRESCENTA,CA91214
(818) 248-3925
Projects included underwater investigation and cleaning of the interior of the reservoirs, as well as preparation of reports for each reservoir investigated. The reports included photo surveys, observations, conclusions, recommendations, and cost estimates. The District also required a narrated video for each reservoir. Once all reservoirs were evaluated, a detailed ten-year maintenance schedule was established for the District to assist in long-term planning for maintenance of their reservoirs. HAE prepared the specifications and plans for the rehabilitation of five reservoirs and provided the quality control inspection.

ROWLAND

WATER DISTRICT
CLIENT SINCE: 1998
MR. ERIC HALL
3021 S. FULLERTON ROAD
ROWLAND HEIGHTS,CA91748
(562) 697-1726

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022
a year's overview
www.harpereng.com Page 18

GOLDEN STATE

WATER COMPANY
CLIENT SINCE: 1994
HAE has been accomplishing reservoir projects for the District since 1999. HAE prepared the plans and specifications and provided quality control inspection and construction management for the rehabilitation of 20 reservoirs, including coating, painting, and structural safety upgrades. These projects have included performing dive and float evaluations of all 64 reservoirs for corrosion, structural, and safety compliance and, in the last five years, preparation of a maintenance Prioritization Report for all 64 reservoirs. In addition, HAE has designed eight new reservoirs and provided the construction management and quality control inspection of 22 of the reservoirs. HAE has had multiple projects with the District continuously throughout the last five years.

COACHELLA VALLEY

WATER DISTRICT
CLIENT SINCE: 1999
MR.DAN RUIZ
75-515 HOVLEY LANE EAST
PALM DESERT,CA92211
(760) 398-2661
MR. KIRKPHILLIPS, P.E.
160 E.VIAVERDE, SUITE 100
SAN DIMAS,CA91773
(909) 305-5427
HAE has provided engineering services to Golden State Water Company (GSWC) for the past 26 years in Northern and Southern California. Currently, HAE is working with GSWC on a project to prepare the technical specifications and plans for the rehabilitation of 10 water storage reservoirs. For years, HAE has worked on all aspects of GSWC projects creating a turnkey process for this client. Past projects have included dive investigation of interiors and investigation of exteriors for structural and corrosion protection; testing for lead and heavy metals; preparation of reports with recommendations and cost estimates; preparation of technical specifications for coating, paint, cathodic protection, and safety structural upgrades; preparation of bid packages; project management; and quality control inspection.

HARPER & ASSOCIATES
ENGINEERING, INC. March 18, 2022

Y E ARS

E X P ERI ENC E
3 2
Mr. Harper, President of Harper & Associates Engineering, Inc., has been working for the past 25 years extensively in corrosion and tank structural engineering projects, primarily related to steel and concrete tank evaluations and rehabilitation. Mr. Harper is a Project Engineer for HAE responsible for overseeing all field operations and is the lead diver for diving inspections for the evaluation of coating, painting, and seismic/structural projects.

Mr. Harper has performed over a thousand inspections on steel and concrete water tanks, wastewater treatment plants, elevated tanks, pressure vessels, and pipelines.

OVERVI EW
BSCE, Construction Engineering
California State Polytechnic
University, Pomona
Cal/OSHA Confined Space
Certified
Dive Certified
CPR Certified

EDUCAT IO N
American Water Works
Association
National Association of
Corrosion Engineers
Inland County Water Association
Southern California Water
Utility Association

M E M BERS H I P S

NA C E L E V E L
III

CERT I F I ED
# 5 5 3 9 5

PRE S IDE N T

A N DRE

H ARP ER

Y E ARS

E X P ERI ENC E
3 0
Ms. Harper, Vice President and Principal Engineer of Harper & Associates Engineering, Inc., has been working for the past 25 years extensively in corrosion and tank structural engineering projects, primarily related to steel and concrete tank evaluations and rehabilitation. Ms. Harper is responsible for quality assurance/quality control for all aspects of the firm including analysis of corrosion problems, preparation of specifications and plans, construction management, maintenance programs, inspection, and coordination with clients.

OVERVI EW

VICE PRE S IDE N T

KRI S TA
H ARP ER, P . E .

BSCE, Construction Engineering
California State Polytechnic
University, Pomona
2019 Inductee into the
School of Engineering
Hall of Fame

EDUCAT IO N
American Water Works
Association
Past Chairman of the Tanks,
Reservoirs, Structures,
Maintenance Committee and
Past Chairman Corrosion
Control Committee
National Association of
Corrosion Engineers
Inland County Water Association
Southern California Water
Utility Association

M E M BERS H I P S

REGI S T ERED

C I V I L ENGINE ER
C
7 1 2 8 0
Mr. Ayala has been an Engineer for Harper & Associates Engineering, Inc. since 2017. He provides engineering services for water tanks and wastewater treatment plants. In addition, Mr. Ayala one of the engineers part of HAE’s dive team. Mr. Ayala assists in conducting field evaluations and preparing and editing technical specifications and plans for a variety of projects including water tanks, wastewater treatment plants, pipelines, and pressure vessels.

OVERVI EW
Y E ARS 5 E X P ERI ENC E
OHSA/Confined Space Entry
Certified
CPR Certified
Open Water Dive Certified
American Water Works
Association

REGI S TRAT IO N S

P A S T RE L A T ED PROJ E C T E X P ERI ENC E
2020 - Moulton Nigel Water District - Rancho 1 & Rancho 2 Reservoirs Rehabilitation Project
2019 - Long Beach Water District - Alamitos 5 & Alamitos 6 Tanks Rehabilitation Project 2018 - Crescenta Valley Water District - Markridge Reservoir Rehabilitation Project

E N GI N E ER A N D

CERT I F I ED DIVER

AL EXI S
AYALA
BSE, Engineering
California State Fullerton
University

EDUCAT IO N

Y E ARS

E X P ERI ENC E
5 0
Mr. Jones is a Registered Corrosion Engineer and NACE Certified Corrosion Specialist with over 50 years of experience. His specialty is corrosion mitigation with cathodic protection of water storage reservoirs and tanks, water transmission and distribution pipelines, wastewater and reclaimed water facilities, buried storage tanks and associated piping, oil and gas pipelines, docks, piers, and pilings, and related structures. He also performs field testing of existing cathodic protection systems including troubleshooting rectifier and sacrificial anode problems, underground shorts to foreign piping, dielectric insulator testing, and complete reporting with recommendations. Mr. Jones will be responsible for the cathodic protection design.

OVERVI EW

S T EVE
JO N E S P . E .

CAT H ODIC PROT ECT IO N

E N GI N E ER
BSEE, Electrical Engineering,
Kansas State University
Graduate Work at University of
Washington

EDUCAT IO N
American Water Works Association
National Association of Corrosion
Engineers since 1970
Past Chairman of NACE LA Section
Past Chairman of Western Corrosion
Seminar, Cal Poly Pomona
Steel Structures Painting Council
Past Chairman of Southern California
Cathodic Protection Committee, Los
Angeles, CA
I.E.E.E

M E M BERS H I P S

REGI S T ERED

CORROS ION

ENGINE E ER
CR
2 9 8
NA C E

C ERT I F I ED
# 2 1 34

Response
to
CITY OF CRESCENT CITY’S

REQUEST FOR QUALIFICATIONS
FOR

ENGINEERING SUPPORT SERVICES
from
Michael Young - Civil Engineer
3750 Lake Earl Dxive
Crescent City, CA 95531
Michael Young Civil Engineer
3750 Lake Earl Drive
Crescent City, CA. 95531
707-954-5178
r*
—<
March 18, 2022
City of Crescent City
Attn: Jon Olson, Public Works Director
377 J Street
Crescent City, CA. 95531
Re: Qualifications to provide Civil Engineering Services Dear Mr. Olson:

Following is my response to the City’s Request for Qualifications to provide civil engineering services on an “as-needed” basis. This proposal is submitted by the undersigned operating as a sole proprietorship as “Michael Young - Civil Engineer” located at 3750 Lake Earl Drive, Crescent City 95531. I, Michael Young, California Registered Civil Engineer #17413, will be the Project Manager.

To veiy briefly summarize my qualifications, I have been directly involved in almost every major Crescent City water and wastewater project since 1973, not to mention other projects.

As such I bring an unmatched wealth of experience, knowledge and history of the City’s utility systems.

I look forward to discussing the opportunity to be of further assistance to the City.

Sincerely,
Mi Voting

STATEMENT OF QUALIFICATIONS

ORGANIZATION OF FIRM
The firm of “Michael Young - Civil Engineer” is a sole proprietorship with a staff of one person -myself, Michael J. Young. I opened the business in 2004 after I retired as Crescent City’s Director of Public Works. Prior to my employment as Del Norte County Engineer and then Crescent City’s Director of Public Works, I owned and managed Michael Young and Associates, a civil engineering consulting firm (1979 to 1998) which employed, at onetime, 12 persons.

Michael Young and Associates was a general civil engineering consulting firm providing civil and structural engineering services primarily, but not exclusively, in Del Norte County.

RELATED WORK EXPERIENCE AND QUALIFICATIONS
The Request for Qualifications was presented with a view towards ultimately requesting professional services “...to be performed on an on-call, as needed basis.” With that scope of services in mind, I am especially well qualified. I was Crescent City’s;

1. City Manager and City Engineer from 1973 to 1979,

2. County Engineer (Del Norte Country) from 1997 to 2001,

3. Director of Public Works from 2001 to 2003,

4. Interim City Manager from May 2008 to February 2009,

5. Contract Project Manager from February 2013 to August 2014,

6. Contract Project Manager from May 2015 to May 2017, and

7. Interim City Manager from May 2017 to January 2018.

On all these occasions, I was involved in the design and/or operation and/or management of certain City facilities and projects.

My consulting firm, Michael Young and Associates (MYA), was also part of my long-term involvement with the City’s facilities. In the early 1980’s MYA designed the water system expansion that included improvements at the City’s water source (Ranney Collector) and the construction of the 1.5 million gallon Amador Street storage tank. Then, in the late 1980’s MYA, again, designed additional improvements at the Ranney Collector, improvements at the Chlorination Building and a transmission line from the Collector to the then under construction Pelican Bay State Prison.

My most recent projects with municipal type facilities, are:

1. Water system expansion, including production, treatment and storage facilities, wastewater treatment system repair and expansion for the ELWA Hospital expansion and 140 acre mixed use campus, Paynesville, (Monrovia) Liberia.

2. Water system design (production, treatment, distribution and storage) and wastewater system design (collection, special treatment and disposal for relocation of Bethesda Medical Clinic, Vaudreuil (Cap Haitian), Haiti.
1 3. Water system improvements (supply source, treatment and conveyance) for the expansion of the AIC Litein Community Hospital and Medical School, Litein, Kericho County, Kenya (100 beds to 350 beds and 100 to 250 resident medical students),

4. Wastewater system improvements (treatment and disposal) for the expansion of the above AIC Litein Community Hospital and Medical School, Litein, Kericho County, Kenya,

5. Water system improvements (supply source, treatment and conveyance) for the expansion of the CURE Children’s Hospital of Uganda, Mbale, Uganda,

6. Multipurpose Building (20 meters x 26.5 meters, 2 story, reinforced concrete) for a private girls school (on-site residence), Hazrapur, Bangladesh, and

7. Preliminary planning and final design of Crescent City’s “Front Street Drainage Project” funded through a Community Development Block Grant.

As noted on my personal resume (attached), I have 59 years of professional engineering experience and have been a licensed California Civil Engineer since 1967. Approximately half of my professional career has been in the public sector (cities and counties) and half in the private sector. My experience has focused on small to medium size projects utilizing my skills in structural design, primarily buildings, and water and wastewater systems. Water system projects have included work in the development water sources, water treatment and distribution system. Wastewater projects have included work from collection systems to wastewater treatment to its disposal.

STAFFING AND SUPPORT
As a firm of one person, I am the totality of the staff. Besides the professional engineering services, on small projects I often perform some technical staff services such as drafting. On the larger projects, when needed, I use locally available services,such as surveying and drafting, on a subcontract basis.

KEY PERSONNEL
As noted above, I am a single person sole proprietorship and as such I am the key personnel.

REFERENCES
Lee Tromble,Civil Engineer Crescent City, CA
Don Hartley, General Building Contractor, Crescent City, CA Mark Killops, Land Surveyor, Smith River, CA
707-464-1293
707-218-7688
707-954-6314

HOURLY RATES, REIMBURSABLES AND MARK UP ON MATERIALS
See attached “Schedule of Fees” (enclosed in separate envelope) 2 MINIMUM INSURANCE REQUIREMENTS
I have not, ever, carried professional liability (Errors and Omissions) insurance. As a small, part-time, sole proprietorship, it is difficult to obtain such insurance. My schedule of fees do not include provision for E&O insurance. I am willing to discuss this issue if desired. # # # # # # #
3 MICHAEL JAY YOUNG
3750 Lake Earl Drive, Crescent City, CA 95531

WORK EXPERIENCE
January 2004 - present
Part-time self-employed civil engineer with practice focus on domestic and international public service projects, including building design, and water and wastewater systems.

Michael Young -Civil Engineer
May 2008 -February 2009
May 2017 -January 2018
City of Crescent City,California
Interim City Manager
Responsible for the administration and management of all City operations and recruitment of a permanent City Manager (2 tenns)
City of Crescent City,California July 2000 -December 2003 (retired) Director of Public Works/City Engineer
Responsible for the management of a municipal Public Works Department, including engineering; water supply, treatment and distribution; wastewater collection and treatment; streets; stonn drainage; parks; and building inspection.

County of Del Norte, California May 1998 -July 2000
County Engineer, Deputy Director of Community Development Department Directly responsible for engineering; roads; wastewater collection; drainage; and airport.

Indirectly supervised planning and building inspection.

Michael Young and Associates April 1979 -May 1998
General partner of a small (10 person) general civil engineering company involved in the planning and design of residential and commercial land development and building projects.

Work included planning and design of public works infrastructure to serve the developments, and structural design of residential, commercial and industrial buildings. Work also included developing on-site water and wastewater facilities needed to support development.

City of Crescent City, California
City Manager/City Engineer
Responsible for the administration of a small full service municipality, including water, wastewater, police, streets, parks, housing authority, city planning, building inspection and library. Project Manager for the planning and construction of expansion of water and wastewater treatment facilities, including regionalization.

May 1973 -April 1979
4 City of Madera, California
City Engineer/Planner
Responsible for the City engineering, Planning Department, and Building Inspection.

September 1971 -May 1973
Jennings-Bartlett & Associates, Ventura
Project Engineer
Prepared project feasibility studies and design of public and private sector projects, including structural design of commercial buildings.

December 1969 -May 1971
County of Ventura, California
Senior Civil Engineer
In charge of Road Planning Division which included Advanced Planning, Transportation & Traffic Engineering, and Subdivision Review Sections.

December 1968 - December 1969
City of Los Angeles June 1963 -December 1968
Department of Water and Power
Civil Engineer
Broad variety of general civil design and planning work, including structural design, water, wastewater, drainage, streets, etc.

EDUCATION
Bachelor of Science, Civil Engineering - Los Angeles State College Graduate work (30 units), Civil Engineering and Business Administration - University of Southern California and California State University at Los Angeles.

LICENSE
Registered Civil Engineer - California - Cl7413
5 Statement of Qualifications
for
Architectural Services
Prepared For:

City of Crescent City
&
O
c
_>
I85A C N't diIF
Prepared By:

Matson & Vallerga
A R C H I T E C T S , I N C .
3234 T Street
Eureka, CA 95503
(707) 443-1669
Table of Contents
Cover Letter / Letter of Interest
Firm Description
Project Team
References and Project Examples
Fee Description

1. 2.

3. 4.

5.

Page 2 ends
Page 3 ends
Page 5 ends
Page 6 ends
Page 7 ends
Page 13 ends

Q
CT0OOO0
CO
Table of Contents:
rso
March 17, 2022
City of Crescent CityJon Olson, Public Works Director377 J StreetCrescent City, CA 95531Dear Mr. Olson:Subject: Architectural Services - Request for Qualifi cationsThank you for your interest in Matson & Vallerga Architects, Inc. We look forward to a spirit of teamwork with you and are thus very pleased to present the enclosed qualifi cations for your consideration.Our fi rm is supported by considerable history in the planning, design and construction of educational facilities, medical facilities, commercial businesses, and institutional projects throughout the region, extending back to its inception in 1954. Deep in experience, yet intimately accessible, we feel our fi rm would be a true benefi t to the City of Crescent City. In addition to the general historical experience referenced above, our offi ce is very knowledgeable with regard to the specifi c program needs and functional requirements of governmental and institutional work, having completed several successful projects on numerous facilities in the past several years. >
ZJO cr XI O3 m 2F
>
o(S>
=L
Z
.
"t C<5
O

1. Cover Letter
/ Letter of Interest:
oo
4 Firm identification as follows:

Matson & Vallerga Architects, INC.

Mark Gaxiola, AIA, Principal
3234 T Street
Eureka, CA 95503
#C-23899 (5/31/23)
707.443.1669
707.443.4792
[email protected]
License:

Voice:

Fax:

E-mail:

Sincerely,
t
o %
Mark A. Gaxiola, AIA
Principal Architect
Matson & Vallerga office - 1964
Matson & Vallerga Architects, Inc. -
Matson & Vallerga Architects Inc. is the successor to the architectural fi rms of F.T. Georgeson & Associates, Gerald D. Matson, Architect and Matson & Nielsen Architects.

Our fi rm was established when Gerald D. Matson purchased the Eureka offi ce of Franklin T.

Georgeson Architects in 1954 and has operated out of its current location in Eureka since 1960.

Peter L. Vallerga joined the fi rm in 1960. In 1999 the fi rm underwent a name change from Gerald D. Matson Architects, Inc., to Matson & Vallerga Architects, Inc. The fi rm was managed by Peter L. Vallerga following Mr. Matson’s retirement in 1986, with Mark A. Gaxiola taking over management in 2005.

Staff members:
(1) Licensed Architects
(1) Designer / Job Captain
(1) Offi ce Manager / Secretary
Project Team / Offi ce Personnel:

Mark A. Gaxiola, A.I.A., Principal-In-Charge, Architect Renee Miles, Designer / Job Captain
Virginia W. Irving, Offi ce Manager / Secretary
History and Organization
Matson & Vallerga offi ce - Current
5 (/)
O
Q_
O
(/)
<D
E
LL
CM
Mark A. Gaxiola - Principal - Project Architect - Matson & Vallerga Architects, Inc.

Education: California Polytechnic State University, San Luis Obispo B.S. Architecture, 1981Registration:California Licensed Architect—No. C-23899Member: American Institute Of Architects - AIAProfessional Experience: 2005 - Present Owner / Principal Matson & Vallerga Architects, Inc. See Below 11 / 99-2005 Architect Matson & Vallerga Architects, Inc. Client Contact, Preliminary Design, Schematic Design, Cost Estimates, Project Planning, Estimating, Specifi cations, Construction Observation, Contract Administration and State Agency Coordination for a Variety of Projects. 1991-1999 Project Architect Crow/Clay And Associates, Eureka, Ca Supervision, Client Contact, Preliminary Design, Schematic Design, Cost Estimates, Project Planning, Estimating, Specifi cations, Construction Observation, Contract Administration And Coordination For Commercial, Recreational, Educational, Civic, Industrial And Multi-Family Projects. 1987-1991 Chief Designer/Project Manager Ers And Associates, San Diego, Ca Supervision, Client Contact, Preliminary Design, Schematic Design, Cost Estimates, Project Planning, Estimating, Specifi cations, Construction Observation, Contract Administration And Coordination For Commercial, Offi ce, Multi-Family And Custom Residential Projects. 1985-1987 Job Captain Sillman / Wyman And Associates, San Diego, Ca Design, Coordination And Production Of Commerical, Retail, Multi-Family And Medical Projects. 1983-1985 Senior Designer / Job Captain Layson Associates, Escondido, Ca Design, Planning And Production Of Custom Home, Estate And Resort Projects. 1981-1983 Head Of Design Department Cathedralite, Inc., Medford, Or Lead Series Of National Building Seminars, Designed And Hosted World’s Fair Exhibits. Produced Commercial And Residential Plans. 3. Project Team: o Eureka Unifi ed School District Contact: Charley Batini Phone: 707-441-2503 2100 J Street Eureka, CA 95503 Mad River Community Hospital Facilities Contact: Amy Ford Phone: 707-367-8985 3800 Janes Rd. Arcata, CA 95521 Making Headway Center for Brain Injury Recovery Contact: Laurel Northrop Phone: 707-442-7668 Ext 206 730 K Street Eureka, CA 95501 Grant Elementary School - Eureka City School District
Eureka, CAThis 2005 project included construction of a new administration building and modernization of seven classrooms. Student restrooms were renovated and enlarged for accessibility. New covered walkways and a new ramp for playfi eld access were also constructed.• Contact: Mark Gaxiola• Completed: 2005• Bid Amount: 2.75 million• # Change Orders: 6• Price of Change Orders: $240,000• Final Cost: $2.99 million ($180,000.00 Attributed to Addition of Relocatable Building)

4. Project Examples:
oo
The Washington Elementary School project
included modernizing (11) Classrooms, Library, Multi-Use space, Kitchen, Toilet Rooms and the construction of a new Administrative Offi ce wing.• Contact: Mark Gaxiola• Completed: 2005• Bid Amount: 1.88 million• # Change Orders: 3• Price of Change Orders: $420,000• Final Cost: $2.3 million ($300,000.00 Attributed to Addition of Relocatable Building) Washington Elementary School, Eureka, CA

4. Project Examples:

O
The Blue Lake Elementary School project
included construction of a new 8,000 sq. ft. Gymnasium building on the existing campus with seating for 150 spectators and related support areas.• Contact: Mark Gaxiola• Completed: 2014• Bid Amount: 1.51 million• # Change Orders: 1• Price of Change Orders: $79,126• Final Cost: $1.58 million *Section 17406 Leaseback Construction Program (Dinsmore Construction).

Blue Lake Elementary School, Blue Lake, CA

4. O
The Wharfi nger Building project is a community
center project with large 2,100 sq. ft. meeting room, full service kitchen, conference area, accessible restrooms, extensive lower level storage, and was designed and driven with environmental considerations in mind. • Contact: Mark Gaxiola• Completed: 1998• Bid Amount: 1.5 million Wharfi nger Building, Eureka, CA
Entry Ceiling
Meeting Room Trusses

4. Project Examples:

Multiple Assistance Center
City of Eureka, CAEureka, CA
This project was the conversion of an existing city-owned building (consisting of three structures), into a 24-hour transitional living center for families, single men, and single women. The family and single populations are contained separately. Accomodations include sleeping rooms, community rooms, dining hall, children’s area, classrooms, laundry facilities and related staff areas. A covered children’s play area is available for recreation during inclement weather. • Contact: Mark GaxiolaClient: City of EurekaCost: 3.2 Million 24-hour Transitional Living Center

4. Project Examples:
ro
2022.4.004
Prepared for:

City of Crescent City
Public Works Department
377 J Street
Crescent City, CA 95531
Attn: Jon Olson
Submitted by:

Oscar Larson & Associates Consulting Engineers, Inc.
317 Third Street, 2nd Floor
Eureka, CA 95501
800-660-2043 • www.olarson.com
March 18, 2022
Sitericeinnjemj'ii oT CZ^LUJSJUU
^L
HL
-
To iPirovude
u , I i
A OUWILr1 r\ n n n r* , o
-injinceciciLUirsi n n n cs n
KJ LJ LIU U LJOLJ U o—oLJ O
O
Te
^
vu J rs
11“ M
- 2^ 1 r\
' -
\
-0
-
/
- CL. dd ^0
—J X /
[RF 2022-00TJ n

TABLE OF CONTENTS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
i
Page
COVER LETTER .................................................................................................................................. 1 ORGANIZATION OF FIRM ................................................................................................................ 2 RELATED WORK EXPERIENCE AND QUALIFICATIONS........................................................... 3 STAFFING AND SUPPORT ................................................................................................................ 8 KEY PERSONNEL ............................................................................................................................... 9 REFERENCES..................................................................................................................................... 10 HOURLY RATES, REIMBURSABLES AND MARK UP ON MATERIALS................................. 11 MINIMUM INSURANCE REQUIREMENTS................................................................................... 12 APPENDIX 1 – RESUMES
APPENDIX 2 – PROJECT PROFILES

COVER LETTER
phone: 707-445-2043 • phone: 800-660-2043
707-445-8230
e-mail: [email protected]
website: www.olarson.com
Oscar Larson & Associates
Consulting Engineers, Inc.
317 Third Street •2nd Floor •Eureka •CA 95501
fax:

March 18, 2022
City of Crescent City
Public Works Department
377 J Street
Crescent City, CA 95531
Attn: Jon Olson
Subject: Statement of Qualifications for Engineering, Planning, Environmental, Architectural & Related Support Services
Dear Mr. Olson:

Oscar Larson & Associates (OLA) is pleased to submit this statement of qualifications to provide oncall civil engineering, planning and environmental services. Our key staff, Kenneth G. Davlin, MBA, PE #21553, Project Manager and/or Project Engineer; Edward L. Marlow, PE #35073, Staff Engineer; Gregory M. Hall, PE #73260, Staff Engineer; and Jason P. Lawrence, Engineer Technician, are all available to begin work on your project immediately when called, and would be committed to completing each assignment as expeditiously as possible. Depending on the assignment, we will supplement our staff with Larry D. Henderson for Permitting and Environmental Studies; Prairie Moore of Natural Resources Management for Special Environmental Studies; Eric Rauber, PE, GE of LACO, for geotechnical investigations; and David A. Crivelli, PLS. and Michael D. Pulley, PLS. of Points West Surveying for surveying. When electrical and controls work is required, we would assign James Rankins, PE, Electrical Engineer, for that work. When work is required on regulated chemicals we would assign Carter Redding, CHMM.

As discussed further in this statement of qualifications, all are highly experienced in all aspects of civil engineering with many years of experience and having completed numerous successful projects.

We acknowledge receipt of Addendum No. 1, dated March 9, 2022.

The following pages provide our qualifications and other information requested. If you have any questions or require further information, please contact me.

Sincerely,

OSCAR LARSON &

CONSULT
Kenneth i
President

OSCAR LARSON & ASSOCIATES
Engineering»PIanning*Construction Management

CITY OF CRESCENT CITY
i

ORGANIZATION OF FIRM

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
2 Oscar Larson & Associates (OLA) is a California incorporated consulting engineering firm that has provided a variety of services for clients since 1945, a total of 77 years. We are a certified small business with a skilled staff of 3 registered engineers and 5 technicians and clerical personnel. Our office is located in Eureka. Our company cultivates a reputation which includes open communication, initiative, flexibility, and capable project coordination to deliver high quality engineering, planning, and construction management services to clients. Over the years we have had assignments as City Engineers for five cities and District Engineers for two districts. We have also had experience in establishing new water/sewer district service areas and designing the expansion facilities.

Our diverse team of engineers has managed hundreds of projects from the application and financial planning phases, through environmental document preparation and approval, design, and construction monitoring support. Our professional and technical staff interacts effectively with each other and the client to identify and meet clients’ objectives. We have specialized in providing consulting services for both urban and rural agencies in California, Oregon and Nevada. Over the years we have provided services to more than 150 government agencies. Our current workload is light, and the personnel assigned to this project are immediately available to work on any assigned project.

RELATED WORK EXPERIENCE AND QUALIFICATIONS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
3 Overview of Qualifications and Experience
Ken Davlin, MBA, PE #21533, the proposed Project Manager, has been City Engineer for five cities in Humboldt County and District Engineer for two water/sewer districts. OLA has completed designs, provided construction management and project management, conducted surveys, obtained permits, obtained more than $80 million in grants and loans, and provided mitigation measures for roads, streets, bridges, harbors, water, wastewater and drainage improvements.

Mr. Davlin has over 45 years of experience in
the field of civil engineering. His experience
includes project management, project scope
development, designs, feasibility studies,
construction management, and consulting for
coastal, hydroelectric, water, sewage, land
development, roads and streets, buildings, and
industrial, commercial and municipal projects.

He practices engineering as a Project Manager,
Project Engineer, and Design Engineer for
infrastructure development programs. His
Project Management and QA/QC skills
incorporate financing programs, assessment
districts, resource allocation, personnel and system administration.

He has been an engineering Project Manager for the development of the Humboldt Bay Harbor and Conservation District, the Blue Lake Rancheria and authored a study for Saipan of more than $2 billion of power plant, water system and sewer system upgrades. He was the Project Engineer for a 24x106 hockey ice skating arena for a Russian ice hockey team in Kemerovo, Russia. He was a consultant to the Russian government for a water supply system on Lake Baikal.

Mr. Davlin has also done road repair, retaining walls and construction management work for Humboldt County. He has provided similar services to Caltrans on Highway 101 in Humboldt and Del Norte Counties and on Highway 36 in Humboldt County. An example of construction management is the Pebble Beach Drive Cliff Stabilization Project which is described in further detail in the following section, along with other projects that Mr. Davlin has been responsible for.

His experience is broad and includes technical and management responsibilities associated with projects which are represented by the following:
• Water systems up to $40 million
• Coastal facilities projects up to $20 million
• Construction inspection and management projects up to $300 million • Developments up to $60 million; residential and commercial • Financial programs preparation, including assessment districts • Hydroelectric projects up to $40 million
Walmart - Bayshore Mall

RELATED WORK EXPERIENCE AND QUALIFICATIONS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
4 • Industrial projects up to $250 million
• Road/street projects from small projects to five miles of freeway construction on Highway 101 • Site survey projects up to $300 million
• Capital program development for more than $2 billion
• Water and Sewer Rate Studies
• Water system and system piping and pump stations for cities and districts well lift stations and force mains
• Water and Sewer System Planning and Design
• Construction management for water and wastewater treatment facilities • Planning and Design of lift stations and force mains
• Computer modeling of water and sewer systems
• Computer modeling of waste treatment processes
• Studies, evaluations, reports of the impact of wastewater discharge to ground waters, marshlands, tidal sloughs, rivers and open ocean areas
Additional capabilities and experience have been:
• Planning and design of major water transmission lines • Relocation of existing water transmission lines
• Evaluation of water treatment and distribution facilities • Design of water treatment plants
• Design of water distribution and storage facilities
Many of the water pipeline and sewer projects involved construction in public right of ways including roadway repairs.

Mr. Marlow, PE, has more than 35 years of experience in environmental and energy engineering, providing leadership in developing water and wastewater programs; with an emphasis on energy, water and wastewater systems. His renewable energy experience includes photovoltaic systems, solar thermal, biomass, fuel cells and biogas production and usage. During his career, Ed has served as program and project manager for a variety of multi-million-dollar energy, environmental, and water projects throughout the United States.

Mr. Marlow’s background includes adjunct professor at Folsom Lake College, teaching water and wastewater treatment operations. He also taught biology to German students in the German College Prep program. He has been a trainer in Project Management for two firms.

Ed has worked on six Prop 1 funded projects, five projects funded by the Department of Agriculture, and other state grant programs.

Mr. Hall, PE, has over 12 years of experience in water and wastewater systems, road systems, commercial and residential development and public infrastructure planning, design, and construction management. His experience includes:

RELATED WORK EXPERIENCE AND QUALIFICATIONS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
5 • Water and sewer rate studies
• Water transmission main design
• Hydraulic modeling of water distribution systems
• Design of public water supply wells
• Water well/spring production testing
• Water and wastewater treatment process analysis and design • Sanitary sewer design and rehabilitation
• Preparation of stormwater hydrologic reports and calculations • Stormwater detention basin and culvert design
• Onsite wastewater system design and wet weather testing for onsite wastewater systems • Residential and commercial site design including compliance with the Americans with Disabilities Act
• Levee design and construction management
• Coordination with public agencies from planning through post-construction phases • Preparation of construction contract documents, specifications, drawings, and cost estimates • Construction contract management and administration
• Construction observation and inspection for compliance with contract documents • Concrete sampling and testing and soil compaction testing • Construction staking
Recent projects include:
• Design and construction management for the 1.5 million gallon Cochran Road water tank coating project for the McKinleyville Community Services District. • Studies, planning, design and construction management for the City of Eureka Mad River Pipeline improvements in multiple phases since 1996.
• Design and construction management of a well, transmission pipeline and water treatment facility for the Loleta Community Services District (LCSD). • Construction management for the Wastewater Treatment Facility Improvements for the City of Fortuna.
• Design and construction management for the City of Helena Water Tank 2.

Our complete project team is as follows: Kenneth G. Davlin, PE, will be the Project Manager. Mr.

Davlin has over 45 years of experience in planning, design and construction management. The Project Engineer will be Gregory M. Hall, PE, who has over 12 years of experience. Surveying will be performed by David A. Crivelli, PLS and Michael D. Pulley, PLS, of Points West Surveying.

Environmental services will be provided by Larry Henderson with assistance from Prairie Moore of Natural Resources Management Corporation. Geotechnical services will be provided by Eric Rauber PE, GE of LACO.

The organization chart for the project is shown on page 7. Detailed resumes for all staff and subconsultants are included in Appendix 1. Project profiles are included in Appendix 2.

RELATED WORK EXPERIENCE AND QUALIFICATIONS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
6 OLA is experienced and tested in providing engineering planning, design and construction management. As noted above, we have prepared numerous roadway and other design and construction projects during the 70+ years that OLA has been in existence. We develop a relationship with our clients, communicate with all involved parties and assign responsibilities for all aspects of the design, submittal management and construction management. We provide monthly progress reports with copies to all parties and schedule meetings with all parties as appropriate.

In order to provide staff continuity, we always have a backup staff member to take over in the event the primary staff member becomes unavailable.

Our technical ability to deliver and administer civil projects is demonstrated by the numerous projects that Oscar Larson & Associates has completed in the over 77 years the firm has been in existence.

Some of those projects are highlighted starting on page 8.

Com Tower Humboldt County

RELATED WORK EXPERIENCE AND QUALIFICATIONS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
7 City of Crescent City
Engineering, Planning and Environmental Support Services P
r
o
Special
Environmental
Studies
Natural Resources
Management Corp.

Prairie Moore
Surveying Electrical and
Controls
James W. Rankins,
P.E.

Environmental,
Planning, Permits
Larry D. Henderson
Geotechnical
LACO
Erich Rauber, P.E.,
G.E.

Points West Surveying
David A. Crivelli,
P.L.S.

Michael D. Pulley,
P.L.S.

Risk Management Regulated
Chemicals
Carter Redding, CHMM
Project Engineer
Edward L. Marlow, P.E.

Kenneth G. Davlin, P.E.

City of Crescent City
Jon Olson
Director of Public Works
Project Manager
Project Engineer
Gregory M. Hall, P.E.

STAFFING AND SUPPORT

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
8 The resources available to perform the Scope of Services set forth in the RFQ are those detailed in the previous section. All of the Oscar Larson & Associates’ personnel would be available during off hours. Our response time from Eureka to Crescent City would be 1 hour and 45 minutes, baring delays due to road work or weather.

KEY PERSONNEL

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
9 This information was provided in the previous section entitled Related Work Experience and Qualifications, starting on page 3.

REFERENCES

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
10 Name: City of Eureka
Contact Person: Jesse J. Willor, PE, City Engineer
Phone Number: 707-441-4194
Name: City of Fortuna
Contact Person: Merritt Perry, Director of Public Works Phone Number: 707-725-7650
Name: McKinleyville Community Services District
Contact Person: Pat Kaspari, PE, General Manager
Phone Number: 707-839-3251
Name: Pacific Charter Financial
Contact Person: Alan Painter
Phone Number: 949-707-6114
Name: City of Sacramento Water Department
Contact Person: Ed Silva, Engineer
Phone Number: 916-801-1738
Name: City of St. Helena
Contact Person: Eric Janzen, Assistant Director of Public Works Phone Number: 707-967-2831
Name: Brooktrails Township
Contact Person: Tamara Alaniz, General Manager
Phone Number: 707-459-2494
Name: Butte Hydro
Contact Person: Dan Ostrander, Owner
Phone Number: 530-345-0665
Name: Placer County
Contact Person: Kayla Yeoman, CSMS, Water Quality Support Technician Phone Number: 530-823-4850
Name: Resort Improvement District #1, Shelter Cove
Contact Person: Justin Robbins, General Manager
Phone number: 707-986-7015

HOURLY RATES, REIMBURSABLES AND MARK UP ON MATERIALS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
11 Our Rate Schedule is provided in a separate sealed envelope.

Oscar Larson & Associates will commit to a maximum of an additional 3.5% increase in hourly billing rates for the next year of July 2022 to June 30, 2023.

MINIMUM INSURANCE REQUIREMENTS

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
12 Oscar Larson & Associates has the required insurance as outlined in the RFQ. Any subconsultants we use will also be required to have the same insurance.

APPENDIX 1 - RESUMES

OSCAR LARSON & ASSOCIATES CITY OF CRESCENT CITY
Engineering•Planning•Construction Management
Kenneth G. Davlin, PE
Edward L. Marlow, PE
Gregory M. Hall, PE, QSD/QSP
Jason P. Lawrence, Engineer Technician
Larry D. Henderson, Environmental Planner
Prairie L. Moore, Botanist
J. Erich Rauber, PE, GE
David A. Crivelli, PLS
Michael D. Pulley, PLS
James W. Rankins, PE
Carter Redding, CHMM

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Engineering • Planning • Construction Management SUMMARY-Mar-21 Kenneth G. Davlin, Professional Engineer (Civil)
Senior Engineer
Oscar Larson & Associates
EDUCATION: M.B.A., UCLA, 1970
B.S., Civil Engineering, Utah State University, 1964
REGISTRATION: Professional Engineer in California No. 21533 Disaster Program Safety Assessment Evaluator for
Cal EMA
INTRODUCTION:

Mr. Davlin has over 50 years of experience in the field of civil engineering. His experience includes project management, project scope development, designs, feasibility studies, construction management, and consulting for coastal, hydroelectric, wind, energy, water, sewage, land development, roads and streets, buildings, and industrial, commercial and municipal projects. He practices engineering as a Project Manager, Project Engineer, Design Engineer and Client Consultant for infrastructure development programs, including responsible Surveyor for site and infrastructure planning and development. His Project Management skills incorporate financing programs, assessment districts, resource and budget allocation, personnel and system administration.

EXPERIENCE:

OSCAR LARSON & ASSOCIATES (OLA)
Mr. Davlin manages project teams who provide solutions to clients' needs. He practices consulting in the fields of civil engineering and surveying. His experience is broad and includes technical and management responsibilities associated with all of the technical elements of projects which are represented by the following:
• Airports, airport facilities, airport business parks up to $600 million • Aquaculture projects in North, Central and South America • Coastal facilities projects up to $60 million
• Commercial developments up to $350 million
• Construction inspection and management projects up to $300 million • Consulting for Program Development of wind projects up to 230,000 acres • Consulting for Program Development on projects up to $2 billion • Financial programs preparation, including assessment districts • Hydroelectric – 12 projects up to $40 million
• Industrial projects up to $350 million
• Rail design, relocation, financing plans, and system repair • Residential developments up to $60 million
• Road and street projects from small projects to eight miles of 4-lane freeway construction on Highway 101
• Site survey projects up to $300 million
• Solid waste to energy plant in Canada
• Wastewater projects up to $30 million
• Water systems, both public and private, up to $40 million • Wave power energy projects – 3 designs in California

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Kenneth G. Davlin (page 2)
Engineering • Planning • Construction Management SUMMARY-Mar-21 He has project experience in Canada, England, Panama and Central America, Alaska, Russia, Siberia, the Northern Mariana Islands, and several states within the United States.

He has served as City Engineer in five California cities:
• City of Blue Lake – 24 years
• City of Trinidad – 8 years
• City of Fortuna – 4 years
• City of Rio Dell – 7 years
• City of Ferndale – 3 years
He served as the District Review Engineer during the development of its signature project, a 235-slip marina, and as Engineer of Record for the Humboldt Bay Harbor, Recreation and Conservation District for about $40 million of projects.

Mr. Davlin is experienced in providing expert witness testimony in depositions, mediations, arbitrations, and court room settings for more than 35 years. He has provided consultations to attorneys and insurance companies as well as expert testimony in the following areas: surveying, property descriptions, evaluation of and resolution of property and deed conflicts, building codes, structures, construction conflicts, land development, land use, drainage and flooding problems, water systems, wastewater systems, roads and highways.

MARTIN METALS, INC.

Corporate Controller of international company in the precious metals markets with management responsibility for financial operations, capital improvement programs including laboratories and processing facilities, external financing, and commodity exchange transactions. Primary author of the “Silver Report” for Iron Age Magazine. Member of the committee which established the Los Angeles Commodity Exchange.

WINZLER & KELLY, CONSULTING ENGINEERS
Mr. Davlin was a Design Engineer during his tenure with Winzler & Kelly. He was responsible for and contributed to the design of commercial buildings, roads, and community water and wastewater systems.

He also served as Resident Inspector during construction of the new City of Klamath where he was responsible for roads, drainage, water and sewage systems.

U.S. NAVY
Mr. Davlin was the Public Works Officer and supervised plant operations and maintenance activities on four naval bases. His duties included planning, operations, budgeting, purchasing, and personnel management for Public Works Department improvements on NAS Pensacola, NAF Saufley, and NAF Ellyson. As Resident Engineer (ROICC) he was responsible for construction of all base improvements.

He managed a major expansion program, including base-wide drainage, water, sewage, training facilities, runways, residential and mess hall buildings to double the number of students in the helicopter pilot training program for the U.S. Navy Pensacola Florida Complex; where he reported to the CO NAS Pensacola and the Assistant Secretary of the Navy. He was also a Public Works Officer and OICC at NAVFAC TURKS assigned to the Caribbean Division of the Naval Facilities Engineering Command. Mr.

Davlin was the Public Works Engineer for rail, docks, and quays to support USS Saratoga and other ships

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Kenneth G. Davlin (page 3)
Engineering • Planning • Construction Management SUMMARY-Mar-21 at Pensacola NAS, including project planning, design, construction management, and shore-side facilities maintenance and improvements.

CALIFORNIA DEPARTMENT OF TRANSPORTATION – DISTRICT 1 (Caltrans) Mr. Davlin was responsible as a Survey Party Chief and Construction Inspector for more than eight miles of four-lane freeway construction, including interchanges, bridges, and overpasses on State Highway 101; Survey Party Chief, Construction Inspector and Construction Manager for two-lane highway upgrade projects on State Highway 36.

PROFESSIONAL ASSOCIATIONS:

American Consulting Engineers Council
• member
American Society of Civil Engineers
• member
• past president, North Coast Branch
• past member, San Francisco Section Board of
Directors
American Society of Military Engineers
• past member
American Water Works Association
• life membership
Association of Environmental Professionals
• charter member
California Water Environment Association
• member
Consulting Engineers and Land Surveyors of
California, and ACEC
• past member
Design-Build Institute of America
• past member
International Code Council
• professional member
International Congress of Building Officials
• professional member
The National Professional Engineering Hall of
Fame
• Award
Water Environment Federation
• charter member
ACTIVITIES:

Association of Governing Boards of Universities
and Colleges
• member
Astro Commuter Airlines
• founder and past Board member
California Community College System
• certification as business instructor
• certification as engineering instructor
City of Eureka Building Department Board of
Appeals for California Building Code
• member
• chairman
Eureka Chamber of Commerce
• past member Board of Directors
Humboldt State University
• member of Advancement Foundation Board of
Directors for 8 years
• chair of Finance Committee for 10 years
• guest lecturer
• Distinguished Alumni Award 2012
Institute of the North Coast
• past member of Advisory Board
International Emergency Services, LLC
• Board member
Junior Achievement Program Director for
Humboldt County Schools
Rotary International
• member and Paul Harris Fellow
S-Matrix Corp
• founder and past Board member
St. Joseph Hospital Board of Trustees
• past president and Board member
St. Joseph of Orange Hospital System Corporation
• Board President
• past member of Strategic Planning Committee
Seaplane Global Services Inc.
• Board member

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Edward L. Marlow, Professional Engineer (Civil)
Project Manager
Oscar Larson & Associates
Engineering • Planning • Construction Management SUMMARY 2020 EDUCATION: MS/1982/Civil Engineering/University of Utah BS/1974/Biology/Westminster College
BS/Biology
BA/Behavioral Science
Licensed to teach in Utah, USA, and Germany
REGISTRATION: 1982/Professional Engineer/California/#35073 EXPERIENCE:

Mr. Marlow has more than 30 years of experience in environmental and energy engineering, providing leadership in developing water and wastewater programs; with an emphasis on energy, water and wastewater systems. His renewable energy experience includes photovoltaic systems, solar thermal, biomass, fuel cells and biogas production and usage. During his career, Ed has served as program and project manager for a variety of multi-million-dollar energy, environmental, and water projects throughout the United States.

Ed’s background includes adjunct professor at Folsom Lake College, teaching water and wastewater treatment operations. He also taught biology to German students in the German College Prep program. He has been a trainer in Project Management for two firms.

Ed has worked on six Prop 1 funded projects, five projects funded by the Department of Agriculture, and other state grant programs.

WATER PROJECTS
Project Engineer/Manager, California Rural Water Association: Ed recently worked with CRWA to provide technical assistance to disadvantaged, small water districts and communities throughout California. The projects were funded under the Prop 1 State Grant program. His most recent projects were:
• Daggett Community Services District, Daggett, CA: Daggett is a small community in San Bernardino County. Their water system is very old and not well maintained. He has performed tests on two wells, two storage tanks, and the community distribution system. The conclusion was that all the facilities should be replaced.
• Apple Valley Foothill County Water District; Apple Valley, CA: Apple Valley Foothill is another small disadvantaged community in San Bernardino County. This District has provided good maintenance, but their equipment is old and doesn’t meet current codes. Their water storage tank is also old and undersized. Their plan is to replace the tank with two smaller tanks, but in total with a larger volume of storage.
• Campo Elementary School, Campo, CA: Campo is an Elementary school near San Diego that has its own water system. The wells were old and not performing properly so they have been replaced. The recommendations for this project are to replace the storage tank and the irrigation system. During the drought the play fields died and need to be reseeded and a new irrigation system installed.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Edward L. Marlow, Professional Engineer (Civil) (page 2) Engineering • Planning • Construction Management SUMMARY 2020 • Sheep Creek Water Company, Phelon, CA: Sheep Creek has 7 storage tanks, Ed was the project manager for evaluating the storage tanks, the largest 1 million gallons. These tanks service three pressure zones. There are no booster pump stations – everything is fed by gravity.

Spring Creek Utilities Company, Spring Creek, NV: Project Manager for a multi-year, water system replacement project. This project involved the replacement of over 70,000 feet of inferior and defective piping, the addition of four water storage tanks, two new wells, two booster pump stations and other ancillary improvements. The community was built in the late 1940’s and the contractor/developer used pipe that was too small to adequately transport the water to the customers. This resulted in areas with too little pressure and other areas with too high of pressure. Water shortages were routine. This $14 million project is a 5-year project funded by rate increases. The water company is a private company and cannot receive grants.

Soledad Well Design, City of Soledad, CA: Project Manager for two new wells to replace two older wells that were contaminated with nitrates. The wells, each 1,000 gpm, had hypochlorite disinfection systems. The project also included two new storage tanks. The funding for the two new wells came from the Farmers Home Administration.

Colusa Rancheria, Well Design, City of Colusa, CA: The Tribal Council of the Colusa Rancheria identified the need to construct a new water supply. Mr. Marlow was the project manager for the design and construction of three new wells to serve the Rancheria. The project included geophysical analysis of the aquifers, water quality sampling, and sizing of the casing, screening and gravel pack. Outfitting the well with pumps was also included.

Arcade Water Line Replacement, Sacramento County, CA: Project Manager for the recently completed design of a water line replacement project for the Arcade Water District in Sacramento. The project consists of the replacement of approximately 30,000 feet of distribution piping and 530 customer service connections. Plans were created using aerial photos as a background for the plan views.

Eastside Water District, Groundwater Study, City of Denair, CA: Project Manager for evaluating the impacts of over drafting of the aquifer under the District. Psomas also recommended methods of finding replacement water to either; use for irrigation replacement or to use for groundwater recharge. Psomas also successfully obtained a $250,000 grant for the project – the District had tried three previous times with another consultant and was unsuccessful.

Lodi Water Storage Tank and Booster Pump Station Design, City of Lodi, CA: Project Manager for a new 1,000,000-gallon water storage tank was needed in the eastside of Lodi. The design included a new welded steel tank and 5,500-gpm booster pumping station. The facility also comes equipped with a standby generation system.

MUNICIPAL WATER AND PIPING CLIENTS
Mr. Marlow has over 30 years of experience in providing more than 60 agency clients with water and piping projects services in California.

WASTEWATER PROJECTS
Wastewater Engineer, City of Marysville, CA: Wastewater Engineer from 1980 through 1995. Projects included sewer rehabilitation, wastewater treatment plant expansions, rehabilitation after the floods of 1986, and rate studies. Initiated a City drive to obtain a low-interest loan from the State of California to

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Edward L. Marlow, Professional Engineer (Civil) (page 3) Engineering • Planning • Construction Management SUMMARY 2020 fund needed improvements. Also served as an advisor to the Public Works Director on sewer ordinance issues. The cost of the various projects ranged from less than $10,000 to over $3 million.

City of Half Moon Bay, Contract City Engineer for Wastewater Issues: Program Manager for the City’s wastewater system for 9 years. He has developed the sewer inspection, rehabilitation and renovation program for the City’s system. The program has included the preparation of GIS mapping of the system and televising of the entire system. The City, under his direction, has rehabilitated over 50,000 lineal feet of pipe and rehabilitated three pump stations and two force mains. He has also directed the City on their program to respond to the upcoming SSMP program.

City of Richmond Wastewater Treatment Plant Competition Analysis, Richmond, CA: Provided management consulting services to assist the City staff in preparing a managed competition proposal for reconstruction and operation of the City’s Wastewater Treatment Plant. Reviewed staffing levels, union agreements, reliability requirements, efficiency measures and lead proposal and interview efforts including City Council presentations.

Groveland Community Services District, Groveland, CA: Project Manager for the evaluation and design of a sewer rehabilitation program to serve all 20 miles of the system. This rehabilitation included 8 lift stations.

Ignacio Wastewater Treatment Plant Expansion, Ignacio, CA: Project Engineer for the design of the expansion of the wastewater treatment plant located in Marin County. The average daily flow was 2.1 MGD with an 11-MGD peak wet-weather flow. The design included new headworks, pump station, modifications to the primary and secondary clarifiers, modifications to the existing rock trickling filter, addition of a new biotower, gravity filters, new chlorine disinfection system, new effluent pump station and solids handling facilities. The new solids handling facilities included a new digester and sludge dewatering beds. The sludge was hauled for land application at a remote site. During the summer months, the effluent was used to irrigate pastures.

Linda County Wastewater Treatment Plant and Collection System Improvements, Linda County Water District, CA: Project Manager for the design of improvements to the Linda County Water District treatment plant. The improvements included piping improvements, new sludge drying beds and modifications to the disposal ponds.

Marysville Wastewater Treatment Plant Expansion and Wastewater Recycling Project, City of Marysville, CA: This project involved the design of improvements to the City’s 50-year old wastewater treatment plant. The project included the design of a tertiary treatment plant so that the City could irrigate 85 acres of youth soccer fields. The project also included the following improvements to the Influent Pump Station: automatic bar screen, rag removal and dewatering devices, and flow measurement. New arms were installed on the two-rock trickling filters. The secondary clarifier was completely refurbished with new rakes and motors. A new disinfection system was also installed.

Soledad Phase II Prison, City of Soledad, CA: Project Manager for the planning and design of the improved facilities. The project design flow was 3.2-MGD. The project included a new headworks (with self-cleaning bar rack, fecal rinsing, dewatering and compacting), flow meters, pump station, standby power, eight-mile force main, aeration for the ponds, and new disposal and reclamation area. A unique feature was the inclusion of an additional feeder line that connected a lettuce processing plant and its seasonal wastewater.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Edward L. Marlow, Professional Engineer (Civil) (page 4) Engineering • Planning • Construction Management SUMMARY 2020

MUNICIPAL WASTEWATER AND PIPING CLIENTS
Mr. Marlow has over 30 years of experience in providing more than 60 agency clients with wastewater and piping projects services in California.

ENERGY PROJECTS
Veterans Administration Washington, DC: Program Manager for the writing of a new RetroCommissioning Process Manual for the Veterans Administration. Retro-Commissioning, sometimes called Existing Building Commissioning, should not be confused with commissioning. Where commissioning takes place during the new construction phase of a building’s life or of a specific piece of equipment, Retro-Commissioning always refers to the commissioning of a building that has never been commissioned. This process manual defined the necessary steps of Retro-Commissioning and presented processes and methodologies for conducting the project. The VA did not have a Process Manual for these types of services.

Veterans Administration VISN 15, St. Louis, MO: Program Manager for the Retro-Commissioning of two large VA hospitals in St. Louis, Missouri. The two hospitals were John Cochran VAMC and Jefferson Barracks VAMC. These two projects involved the energy analysis of the energy consuming systems at the two hospitals. The first phase of the Energy Analysis is to establish existing conditions. A thorough evaluation was made of the past three years of energy use – to establish the baseline energy consumption and to use it as a benchmark for later studies. The intensive studies were highlighted with diagnostic monitoring over a 14-day period and functional testing of all the components of the air handling and HVAC systems.

Veterans Administration VISN 11, Battle Creek, MI. and Ann Arbor, MI.: Program Manager for the Retro-Commissioning of two large VA hospitals in Michigan. The two hospitals were in Battle Creek, MI. and Ann Arbor MI. For these two projects, Mr. Marlow provided client liaison, technical and staffing management. These two projects involved the energy analysis of the energy consuming systems at the two hospitals. The first phase of the Energy Analysis is to establish existing conditions. A thorough evaluation was made of the past three years of energy use – to establish the baseline energy consumption and to use it as a benchmark for later studies. The intensive studies were highlighted with diagnostic monitoring over a 14-day period and functional testing of all the components of the air handling and HVAC systems.

Veterans Administration VISN 8, Nine Hospitals in Florida and Puerto Rico: Program Manager and senior engineer for the execution of ASHRAE Level 1 and 2 Audits of 9 VA Hospitals in San Juan Puerto Rico, Gainesville, Bay Pines, Tampa, West Palm Beach, Miami, Orlando, Ft. Myers and Lake City, Florida. These audits were conducted over a 6-month period and included Benchmarking, Creating Baselines and Energy Conservation Identification.

Veterans Administration VISN 1, Taugus, ME, White River Junction Medical Center, White River Junction VT, and Northampton, MA: Program Manager for the Retro-Commissioning of three large VA hospitals in New England. For these projects, Mr. Marlow provided client liaison, technical and staffing management. These projects began with an energy analysis of the energy consuming systems at each hospital. The first phase of the Energy Analysis was to establish existing operating conditions. A thorough evaluation was made of the past three years of energy use – to establish the baseline energy consumption and to use it as a benchmark for later studies. The intensive studies were highlighted with diagnostic monitoring over a 14-day period and functional testing of all the components of the air handling and HVAC systems. A Retro-Commission Report was the product of these 12-month projects.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Edward L. Marlow, Professional Engineer (Civil) (page 5) Engineering • Planning • Construction Management SUMMARY 2020 Veterans Administration VISN 12, Iron Mt. MI, Jesse Brown Medical Center in Chicago, IL. Oscar G. Johnson Medical Center, Iron Mountain, MI: Program Manager for the Retro-Commissioning of three large VA hospitals in New England. For these projects, Mr. Marlow provided client liaison, technical and staffing management. These projects began with an energy analysis of the energy consuming systems at each hospital. The first phase of the Energy Analysis was to establish existing operating conditions. A thorough evaluation was made of the past three years of energy use – to establish the baseline energy consumption and to use it as a benchmark for later studies. The intensive studies were highlighted with diagnostic monitoring over a 14-day period and functional testing of all the components of the air handling and HVAC systems. A Retro-Commission Report was the product of these 12-month projects.

POLICY AND GOVERNANCE
Interim Assistant City Manager and Public Works Director, City of Half Moon Bay, CA: Mr.

Marlow has held a one-year assignment for the City of Half Moon Bay. The City Council requested that he serve first as the Public Works Director and then as the interim City Manager. In these roles Mr.

Marlow was responsible for day-to-day operations and for long-term infrastructure planning for the City.

He worked closely with City staff and Council members to manage the wastewater and stormwater programs. The work has included preparation of CIP programs, rate studies, management and organization studies, design standards, and the management of project design and construction. He routinely makes presentations before the City Council, the Coastal Commission and the Regional Water Quality Control Board.

Contract District Engineer, Murphys Sanitation District, Murphys, CA: Serves as the District Engineer for this wastewater district in Calaveras County. He is responsible for Capital Improvement Projects, Budgets, Cost Management Programs and Supply Purchasing Programs.

Contract District Engineer, Linda County Water District, City of Marysville, CA: Served as the District Engineer for wastewater and water issues in the District. He supported projects and programs, including master planning, CIP development, rate studies, designs and construction. Represented the District before the Regional Water Quality Control Board and sat as staff at District Board meetings.

City Wastewater Engineer, City of Marysville, CA: Managed wastewater engineering programs for the City of Marysville from 1980 to 1995. During this time, he prepared rate studies, master plans and secured low interest loans from the State Revolving Loan Fund. His duties also included presentations to the City Council and the Regional Water Quality Control Board. He also has reviewed and amended the District’s Ordinance and rate schedule. The rate schedule includes a 45% rate increase for user fees and 200% increase in hook-up fees. The District was using reserves to make improvements for development.

CORRECTIONAL FACILITIES
Mr. Marlow has performed civil engineering work at 17 correctional facilities in California and Nevada.

He was involved with the early environmental planning and design for California’s first new model prison – Mule Creek Prison, Ione, CA.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Engineering • Planning • Construction Management April 2021 Gregory M. Hall, PE, QSD/QSP
Project Engineer
Oscar Larson & Associates
REGISTRATION: California Civil Engineer #73260
EDUCATION: B.S. in Environmental Engineering, minor in
Chemistry, Oregon State University, Corvallis,
Oregon, 2001
EXPERIENCE:

Mr. Hall has more than fifteen years of experience in the field of civil engineering. His experience includes water main design and rehabilitation; evaluation and design of potable water supply wells; production testing of private springs; water distribution system modeling; water and wastewater treatment analysis and design; sanitary sewer main design and rehabilitation; stormwater detention basin and culvert design; residential subdivision design; evaluation and design of onsite wastewater treatment systems; levee rehabilitation and design; construction cost estimating; preparation of construction contract documents, plans and specifications; construction management, monitoring and inspection for compliance with contract documents for systems, buildings and structures; preparation of stormwater pollution prevention plans (SWPPPs) and monitoring SWPPP compliance; concrete sampling and testing; compaction testing; and drafting and design using AutoCAD.

PROJECTS:

W-101 Tank No. 2, 3MG Tank Repair and Painting, St. Helena, California (2019-2021):

Project Engineer for tank repair and interior and exterior recoating in the midst of a forest fire and COVID constraints. Experience included preparation of construction drawings, specifications, cost estimates, bid support, construction management and construction observation. Project bid estimate was $850,000.

W-106 Upgrade of Pump Station and Design of Single Tank to a Potable Water Tank, St.

Helena, California (2019-2021): Project Engineer for pump station and design of a single potable water tank of 500,000 gallons to replace three wooden 150.000 gallon tanks. Experience included preparation of construction drawings, specifications, cost estimates, bid support. Project was put on hold due to forest fires and COVID crisis. Project cost estimate is $400,000.

W-110 Upgrade of Pump Station at Existing Rutherford Pump Station Facility. St. Helena, California (2021-2022): Project Engineer for upgrade of pump station at the existing Rutherford pump station facility. Experience included preparation of construction drawings, specifications and cost estimates. Project to be bid 2021-2022. Project cost estimate is $300,000.

Sewer System Planning and Design to Support Site Development, Sun Lazy J LLC, Arcata, California (2019-2021): Project Engineer for engineering study and design, field surveys, city and CA-DHCD coordination. Project cost estimate to be developed.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 2)
Engineering • Planning • Construction Management April 2021 Failed Culvert-Water Tank Access Road, Bertsch-Ocean View CSD, Crescent City, California (2018-2020: Project Engineer for technical, environmental, fisheries impacts, design, PS&Es, studies, permits and PW compliance review. Project estimate was $500,000.

Design Services/Relocation of Sewer Facilities in Middletown, Lake County Sanitation District, Lakeport, California (2018): Project Engineer for studies, design, construction drawings, specifications and cost estimates for agency sewer line construction in Caltrans Highway. Project cost estimate was $1,100,000.

Airport Slurry Seal Project, Shelter Cove, California (2018): Project Engineer for evaluation/of runway taxi way surface, inspection report, construction plans, specifications, cost estimate, approval and permit process, bidding and award process, construction support and project management. Cost was $550,000.

Cross Town Interceptor Emergency Repair, City of Eureka, California (2017): Project Engineer for the replacement of 820 linear feet of 20-inch ductile iron sanitary sewer force main with 18-inch epoxy lined ductile iron force main pipe. The project included replacement of a 6- inch PVC hydrogen sulfide vent pipe that runs parallel to the force main for the total length of the force main replacement, installation of a temporary force main bypass that included hot taps at four locations and line stop valves installed at two locations, and required that the existing force main be shut down for no more than 8 minutes during construction. Experience included pipeline design, preparation of construction drawings and specifications, construction support, and preparation of record drawings. Due to the emergency nature of the project, construction was performed on a force account basis.

Cochran Road 1.5 MG Tank Painting Project, McKinleyville Community Services District, McKinleyville, California (2016-2017): Project Engineer for the interior and exterior recoating of the District’s 1.5 million gallon potable water storage tank. Experience included preparation of construction drawings and specifications; bid support; and construction observation and management. The project was awarded for construction for $375,000.

Feasibility Study at Clear Lake for Installation of Electronic Boat Ramp Gates at Eight Ramps, Lake County Watershed Protection District (LCWPD), County of Lake, California (2016-2017): Project Engineer for the preparation of a feasibility study for installation of electronic boat ramp gates at eight popular public boat ramp access sites on Clear Lake to augment the current quagga mussel prevention program which LCWPD has in place. If approved by the County, the feasibility study will be use by LCWPD to apply for grants for implementation of the project. Construction of the project is estimated at $1.5 million.

Mad River Pipeline Phase 6, City of Eureka, California (2016): Project Engineer for the design and construction of 6,200 linear feet of 24-inch ductile iron water transmission main located in an urban environment. The project included an emergency bypass line, connections to the existing transmission main at three locations, two interties to the existing transmission main, and replacement of three 20-inch gate valves with 24-inch butterfly valves. Experience included evaluation of four alternative routes for constructability, future maintenance and cost;

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 3)
Engineering • Planning • Construction Management April 2021 preparation of construction drawings and specifications; bidding and construction support; and preparation of record drawings. The project was awarded for construction for $2.0 million.

Techite Pipeline Replacement, Humboldt Bay Municipal Water District, Humboldt County, California (2015): Lead construction observer for the construction of 11,000 linear feet of 20-inch PVC water transmission main, 4,400 linear feet of 12-inch PVC water transmission main, air release valve and blowoff assemblies, and fire hydrant. Work included connections to existing pipelines of various sizes and types, installation of steel casing under railroad tracks by jack and bore method, asphalt paving and overlays, replacement of 8,000 linear feet of rolled AC dike, and replacement of existing fire hydrants and water service laterals. Experience included full-time construction observation, monitoring of Best Management Practices (BMP’s), coordination with testing laboratory and construction team, and review of contractor claims and pay requests. Construction was performed during the “wet weather” period in sensitive dune mat and wetland areas located between Humboldt Bay and the Pacific Ocean. Cost of construction was $3.2 million.

Mad River Pipeline Phase 5, City of Eureka, California (2014): Project Engineer and lead construction observer for the design and construction of 3,700 linear feet of 24-inch ductile iron transmission main located partially within the coastal zone. Experience included pipeline design; preparation of construction contract documents, specifications, drawings, and cost estimate; fulltime construction observation; supporting the City through the Coastal Development Permit application process and in obtaining temporary and permanent easements. Cost of construction was $1.4 million.

Waterfront Trail, City of Eureka, California (2014): Project Engineer for the preliminary design of 6,500 linear feet of multi-use recreational trail along Humboldt Bay. The project includes tidal wetlands, bioremediation swales, and stormwater drainage facilities. Experience included preliminary design showing trail routing, extent of grading or fill, and impacts on existing drainage structures; client coordination; and integration of environmental mapping prepared by others into the preliminary design drawings.

Dollar General, City of Rio Dell, California (2014): Project Civil Engineer for civil design for a new Dollar General store. Experience included preparation of a Due Diligence Report to identify site conditions, zoning, available utilities, approval process, and development encumbrances; site design; grading and utility plans; compliance with ADA; preparation of construction drawings and specifications; preparation of a Storm Water Pollution Prevention Plan; permit assistance; coordination with architect and client; and preparation of record drawings.

Zones 3 and 5 Water System Improvements, City of Fortuna, California (2014): Project Engineer for the planning and design of a water line, pump station improvements, and demolition of an elevated water tank. Cost of construction was $1 million.

Northern Interconnect Pipeline, McKinleyville Community Services District, McKinleyville, California (2014): Project Engineer for the planning and design of 4,000 linear

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 4)
Engineering • Planning • Construction Management April 2021 feet of 18-inch PVC water transmission main to provide the District an alternative water supply in the event that the existing water supply under the Mad River fails. Experience included pipeline design and preparation of construction contract documents, specifications, drawings, and cost estimate. Cost of construction was $900,000.

Mad River Pipeline Phase 4 (2013), City of Eureka, California: Project Engineer and lead construction observer for the design and construction of 2,400 linear feet of 24-inch ductile iron transmission main located within the coastal zone. This project was a continuation of projects OLA completed for the City in 2003, 2004, and 2006. Experience included pipeline design; preparation of construction contract documents, specifications, drawings, and cost estimate; fulltime construction observation; monitoring of Best Management Practices; compaction testing of fill materials; coordination with testing laboratory; coordination with permitting agencies; assisting the City in obtaining Erosivity Waivers from the Regional Water Quality Control Board; and review of contractor pay requests. Cost of construction was $1.2 million.

Norton Road 1.5 MG Tank Painting Project, McKinleyville Community Services District, McKinleyville, California (2012-2013): Project Engineer for interior and exterior recoating of the District’s 1.5 million gallon potable water storage tank. Experience included preparation of construction drawings, specifications, cost estimates, bid support, construction management and observation. The project was awarded for construction in the amount of $333,000.

Martin Slough Interceptor Project Phase 1: Gravity Interceptor (2012), City of Eureka, California: Lead construction observer for the construction of 1,600 linear feet of 18-inch gravity sewer pipe; 3,700 linear feet of 24-inch gravity sewer pipe; 800 linear feet of 30-inch gravity sewer pipe; 600 linear feet of 42-inch gravity sewer pipe; 18 manholes ranging in size from 72-inch diameter to 84-inch diameter with poured in place concrete bases up to 20 feet deep; three auger bores; all weather access roads; asphalt concrete paving and overlays; culvert replacements; fencing; relocation of 500 linear feet of 6-inch water main; relocation of pressure sewer and irrigation lines; and modifications to two sewer lift stations. Experience included fulltime construction observation, monitoring of Best Management Practices and reporting to the project Qualified Stormwater Pollution Prevention Plan Practitioner, coordinating with testing laboratory and resident engineer, sampling of water pumped from trenches for compliance with Low Threat Discharge permit requirements, review of contractor extra work reports, and review of contractor pay requests. Cost of construction was $4 million.

Community Drinking Water Well #2 (2011), Wiyot Tribe, Table Bluff Reservation, California: Project Engineer for the design and construction of a new 500-foot deep 33-gpm public water supply well and 1,200 linear feet of 3-inch PVC water transmission pipe to serve the reservation. The purpose of the project was to provide the tribe with a more reliable and higher quality water source, and add redundancy to the water system. Experience included well and pipeline design; preparation of construction contract documents, specifications, drawings, and cost estimate; pump selection; and construction management and administration. Cost of construction was $220,000.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 5)
Engineering • Planning • Construction Management April 2021 Water System Improvements (2011), Loleta Community Services District, Humboldt County, California: Project Engineer for the design and construction of a new 200-foot deep 140-gpm public water supply well, 1,600-feet of 4-inch transmission main, 200-feet of 6-inch transmission main, an iron/manganese removal treatment plant and building, and associated site grading and improvements including ADA compliant facilities. Experience included well and pipeline design; site grading design; preparation of construction contract documents, specifications, drawings, and cost estimate; pump selection; and construction contract management and administration. Cost of construction was $900,000.

Various Projects (2011), Spring Creek Utilities Company, Spring Creek, Nevada: Design team member for a new drinking water booster pump station, 300,000 gallon welded steel ground level potable water storage tank, several thousand feet of 16-inch PVC potable water main, and two public water supply wells. Experience included preparation of construction contract documents and specifications.

Levee Repair Project (2011), Lassen Union High School District, Susanville, California:

Project Manager for repairs and upgrades to 175-feet of levee along the Wild and Scenic Susan River damaged by winter 2006 storms. Experience included acquisition of FEMA and California OES funding; preliminary levee design and calculations utilizing green gabions; and construction cost estimation. This project was not constructed. The estimated cost of construction was $365,000.

Spring Creek Roundabout Water Line Relocation (2010), Spring Creek Utilities Company, Spring Creek, Nevada: Project Engineer for the relocation and upgrade of 500-feet of 8-inch water main to 12-inch. The water main relocation was required by Nevada Department of Transportation (NDOT) due to conflicts with a new NDOT planned roundabout. The project included installation of ±150-feet of pipeline through a steel casing installed by jacking and boring under the NDOT highway. Experience included pipeline design; preparation of construction contract documents, specifications, drawings, and cost estimate; bidding assistance; and preparation of record drawings. Cost of construction was $120,000.

Reservoir Maintenance and Security Project Phase 2 – Electrical, Pumps, and Security (2009), City of Eureka, California: Project Engineer during the construction management phase for upgrades to the City’s water reservoir which included construction of a concrete building to house a new standby generator and related electrical, site grading and paving, replacement of vertical turbine pumps, widening of the existing access road around the reservoir, driveway improvements, new fencing, and a new security sensor system. Experience included equipment anchorage calculations and design; design of alteration to driveway entry portion of the site to be ADA compliant and preparation of construction drawings; concrete pad design for new a transformer; management of construction observation and materials testing team; and construction contract management and administration. Cost of construction was $1.2 million.

Levee Repairs Site #9 Sheet Piling (2009), Levee Repairs Project ‘A’ (2008) and Fall 2006 Emergency Repairs (2007), Reclamation District 768, Humboldt County, California:

Project Engineer for the design and construction of FEMA and CalEMA (formerly California

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 6)
Engineering • Planning • Construction Management April 2021 OES) funded emergency projects which included marine grade sheet piling and rock slope protection repairs and upgrades to 3.1-miles of the 4.9-mile long District owned levee system along northern Humboldt Bay and Mad River Slough which were damaged by winter 2006 storms. Experience included permitting assistance; coordination with public agencies; levee design and calculations; preparation of construction contract documents, specifications, drawings, and cost estimate; construction management and administration; full-time construction observation; management of construction observer team; and soils compaction testing. Cost of construction was $6.6 million.

Sewer Replacement and Prop. 1B Paving Projects (2008), City of Ferndale, California:

Staff Engineer for the replacement of ±50 linear feet of 6-inch sanitary sewer main including replacement of one manhole, and asphaltic concrete overlay of ±7,800 linear feet of city streets.

Experience included preparation of construction contract documents, specifications, drawings and cost estimate; bidding assistance; and construction management. Cost of construction was $340,000.

Waterfront Drive Extension, City of Eureka, California (2008-2006): Staff Engineer for the realignment of 400-linear feet of existing two lane roadway and sidewalks, 1.4-miles of new two lane roadway with sidewalk and Class II bike lanes, and 1.1-miles of new Class I multi-use recreational trail. The project included relocation of existing utilities, relocation of 1,430-linear feet of existing NCRA railroad tracks, new railroad crossings, new tidal wetlands and bioremediation swales, new stormwater drainage facilities, new intersections, and retaining walls. Experience included roadway design and calculations; stormwater drainage studies; preparation of maps and figures to supplement the planning and permitting process; preparation of preliminary construction drawings; client coordination; and coordination with public agencies.

This project was not constructed.

Pahrump Water Improvement Projects, Utilities Inc. of Central Nevada (2007): Project Engineer for the design of 24,000 linear feet of 8”, 12”, and 14” PVC water transmission mains and appurtenances including mainline valves, fire hydrant assemblies, and service assemblies.

Experience included pipeline design, management of design team, and preparation of construction drawings.

Wastewater Treatment Facility 2004 Expansion Project, City of Fortuna, California (2007): Staff Engineer for the construction management of the City’s wastewater treatment facility expansion project. The project consisted of headworks and secondary treatment expansion and a new solids handling facility including anaerobic digestion, cogeneration, and dewatering components. Experience included construction observation and submittal review.

Cost of construction was $11 million.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 7)
Engineering • Planning • Construction Management April 2021 Mad River Parallel Pipeline, City of Eureka, California (2006-2003): Design team member, lead construction observer, construction management and materials testing for the design and construction of water transmission mains, valves, and valve structures including 5,100 linear feet of 24-inch ductile iron pipe completed in 2006 ($1.7 million), 5,600 linear feet of 18-inch ductile iron pipe completed in 2004 ($1.4 million), and 26,900 linear feet of 28-inch high density polyethylene pipe completed in 2003 ($4.2 million). Experience included pipeline design and calculations; preparation of construction drawings; full-time construction observation; concrete testing; compaction testing of backfill materials; sampling of water pumped from dewatering wells and excavations for compliance with Regional Water Quality Control Board discharge requirements; submittal review; review of contractor pay requests; client coordination; and preparation of record drawings. Cost of construction for the three projects totaled $7.3 million.

Clearwell and Backwash Water Recycling Project, Brooktrails Township Community Services District, California (2006): Design team member and materials testing for the relocation of an existing 50,000-gallon welded steel clearwell tank, conversion of the existing clearwell tank to a chlorine contact basin, design of a new 160,000-gallon steel clearwell tank, utility design, and design of backwash water recovery ponds and outlet structures. Experience included clearwell and backwash water recovery pond design; site layout and grading design; preparation of construction drawings; client coordination; bidding assistance; construction observation; concrete testing; and compaction testing of backfill materials. Cost of construction was $1.2 million.

Eureka High School Gymnasium Phase 1A Construction, Eureka, California (2005):

Design team member for the estimated $12 million project which included demolition of the existing gymnasium and construction of a new gymnasium. Experience included site layout and grading design; water, sewer and storm-drainage utility design; emergency vehicular and ADA accessibility design; preparation of demolition, grading, drainage, utilities, and paving plans; and coordination with design team members and public agencies. This project was not constructed.

H Street Sewer Basin Rehab, City of Eureka, California (2003): Design team member and lead construction observer for the lining of 2,900 linear feet of 6-inch vitrified clay pipe and 800 linear feet of 8-inch vitrified clay pipe with similar size polyvinyl chloride pipe using fold and reform trenchless technologies, and the rehabilitation of manholes using epoxy coating.

Experience included sanitary sewer inflow and infiltration studies; preparation of construction drawings; bidding assistance; full-time construction observation; submittal and pay request review; client coordination; and preparation of record drawings. Cost of construction was $300,000. Mr. Hall received special thanks from the City of Eureka for his support on this project.

MISCELLANEOUS PROJECTS:

Project Engineer and design team member for various private and commercial developments, including McCabe Subdivision, McKinleyville, California (2006); Yurok Indian Housing Authority Residential Site Developments (2006 & 2005) and Office Parking Lot Improvement Plans (2005); Davlin and Diehl Minor Subdivision, Crescent City, California (2005); Hunter

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 8)
Engineering • Planning • Construction Management April 2021 Mini-Storage, McKinleyville, California (2005); Roger Johnson Minor Subdivision, McKinleyville, California (2005); Blue Lake Rancheria Parking Lot Addition, Blue Lake, California (2004); Turner Subdivision, McKinleyville, California (2003); Fay Slough Wildlife Area Tidal Restoration, Eureka, California (2002).

Materials testing on various projects, including concrete testing for Yurok Indian Housing Authority Residential Site Developments (2007); concrete and compaction testing for the City of Eureka Mad River Pipeline Projects, Eureka, California (2012, 2006, 2004, & 2003); concrete and compaction testing for the Southern Humboldt Senior Care Apartments, Garberville, California (2004); concrete testing for Brooktrails Township Community Services District Clearwell and Backwash Water Recycling Project, Willits, California (2004); concrete and compaction testing for the Manila Dunes Recreational Trail and Access Project, Manila, California (2003); concrete testing for Brookings Jr. High School and High School Gymnasium Projects, Brookings, Oregon (2002).

Various designs, reports and studies, including a water distribution study for the City of Etna, California (2003); a preliminary onsite wastewater treatment system design for Bear River Casino, Humboldt County (2003); a feasibility study for wastewater collection and treatment for the town of Laytonville, California (2001); an ADA accessibility study for the Mad River Hospital, Arcata, California (2001); and groundwater level monitoring, percolation testing, and design of various residential onsite wastewater treatment systems.

AFFILIATIONS:
• American Society of Civil Engineers, Associate Member • Engineers Without Borders, North Coast Professional Chapter Vice President PROFESSIONAL SEMINARS AND WORKSHOPS:
• Stormwater Management for Oil & Gas Operations, 2013. • BMP Maintenance: Don’t Get Caught With Your Fence Down!, 2012. • Track-Out: Constructions Most Common and Costly BMP Violation, 2011. • Best Practices in Manufacturing and Placement of Rubberized Hot Mix Asphalt, 2011. • FEMA Elevation Certificate Workshop, 2009.
• Consulting Engineers and Land Surveyor of California Future Leaders Level 1, 2007. • Tricks, Traps, and Ploys used in Construction Scheduling and Delay Claims in California, 2006.
• Design and Installation of Buried Pipes, 2004.
• Land Desktop Release 3: Customer Application Workshop, 2003. • Working Together for Successful Stormwater Management: A Workshop for Clean Water and Phase 2 Stormwater Compliance, 2002.

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Gregory M. Hall, PE, QSD/QSP (page 9)
Engineering • Planning • Construction Management April 2021 CERTIFICATES:
• Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner (QSP), Certificate #00371
• National Flood Insurance Program FEMA Elevation Certificate, 2009. • Radiation Safety and Use of Nuclear Gauges, 2003 & 2007. • Radiation Safety Officer for Nuclear Gauges, 2003.
• HAZMAT Certification, June 2016
• Certified Safety Assessment Program Evaluator, State of California

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Engineering • Planning • Construction Management Mar-22 Jason P. Lawrence
Engineer Technician
Oscar Larson & Associates
EDUCATION: Graduate San Luis Obispo High School, 1989
INTRODUCTION:

Mr. Lawrence has more than fifteen years of experience in the review and management of water and wastewater projects, sewer rehabilitation, coastal development, commercial and residential developments, and residential subdivisions. His experience started with answering phones and filing, then moved into the field to included materials testing, coordination with public agencies, reviewing of design calculations, construction cost estimating, onsite wastewater evaluation, report preparation, construction observation, construction management, construction drawing preparation, and site drainage.

EXPERIENCE:

Construction observer and engineering technician on a $10 million FEMA/OES funded levee project for the Reclamation District 768, Humboldt Bay, California. The project included emergency repairs and upgrades of 4.9 miles of levee along northern Humboldt Bay and Mad River Slough damaged by winter 2006 storms. Experience included levee design calculations, preparation of specifications, compaction testing, processing of progress payments and contract change orders, full-time construction observation, and coordination with contractor, client, FEMA and OES.

Design team member for McCabe minor subdivision in McKinleyville, California. Experience included concrete and compaction testing, watershed drainage development, preparation of Record Drawings, drafting in AutoCAD, and onsite inspections.

Program Manager for Building/Wastewater Design and Permitting for Cannabis Permits on Private Lands, experience was gained in coordination and communication with multiple State and County agencies.

Project review and coordination for the repair of the City of Fortuna’s wastewater treatment plant percolation beds. Experience included coordination with various local, state, and federal agencies to receive FEMA funding.

Design team member for the Yurok Indian Housing Authority Bennett Site in Klamath, California.

Experience included watershed drainage, drafting in AutoCAD, project coordination, and concrete and compaction testing for residential site development.

Construction observer and engineering technician on the Wiyot Well Site; experience was gained in water well drilling and water drainage.

Nuclear Gauge compacting experience was gained at the Eureka Water District Reservoir as well as at the Loleta Water Improvements and Mad River pipe line improvements.

CERTIFICATES:
• C.P.N. Radiation Safety and Use of Nuclear Gauges, 2007 • AutoCAD 1, CAD Masters, 2007
• AutoCAD 2, CAD Masters, 2008
• Fundamentals of Drilling, 2010
• HAZMAT Certification, May 2016

OSCAR LARSON & ASSOCIATES
CONSULTING ENGINEERS, INC.

Engineering • Planning • Construction Management 2019
Larry Henderson
Planner
Oscar Larson & Associates
EDUCATION: B.S., Civil Engineering, Humboldt State University, 1970 M.U.P., Urban Planning, University of Oregon, 1972
REGISTRATION: California EIT #XE093566
INTRODUCTION:

Mr. Henderson has over 40 years of planning and engineering experience in both the public and private sectors. Prior to association with Oscar Larson & Associates, he worked as a planner and regulator in the public sector for 20 years, and then in the private sector as an engineer and planning and permitting consultant.

EXPERIENCE:

Mr. Henderson has been actively and professionally engaged with planning, permitting, and regulatory compliance at all governmental levels…tribal, local, state, and federal. Agencies he has worked with include special service districts, local city and county governments, the California and Oregon coastal commissions and other California regulatory agencies, and the Army Corps of Engineers and other federal agencies. He has worked and consulted on shortand long-range projects throughout the northern California and southern Oregon regions, and even internationally through the U.S. State and Defense Departments.

In the public sector, Mr. Henderson oversaw the planning programs and permitting operations for cities and counties in Oregon and California. After leaving the public sector, he practiced civil engineering, and retired as a regional manager of an interstate consulting firm of engineers, geologists, and environmental scientists. In retirement, he has continued to consult for public agencies, civic organizations, professional associations, and private parties. He recently served our country, at home and overseas, as a trainer and a military advisor on Middle East affairs.

ACCOMPLISHMENTS:

Through his work, Mr. Henderson has gained extensive knowledge of planning, permitting and regulatory processes and the practical applications of environmental study and conflict resolution.

TRAINING
In addition to his formal education, Mr. Henderson continued advanced courses on local, state, and federal regulatory laws. He has stayed current with ‘best-practices’ for regulatory compliance through seminars and workshops. He has attended—and participated in presenting— numerous workshops for municipal and local government officials on planning and permitting programs and procedures.

Mr. Henderson has completed several independent studies on project management and strategic planning to advance him in his profession. He is a PSMJ Certified Project Manager. The U.S.

State and Defense Departments consult with him as a qualified Subject Matter Expert on strategic matters related to intergovernmental operations and reconstruction of communities.

OSCAR LARSON & ASSOCIATES
Larry Henderson (page 2)
Engineering • Planning • Construction Management 2019

PLANNING ACCOMPLISHMENTS
Mr. Henderson’s long-range planning projects included several rural community plans for Lane County, Oregon; the general plans for the City of Creswell, Oregon, and the City of Fortuna, California; and the general plan and coastal plans for Humboldt County, California.

PERMITTING ACCOMPLISHMENTS
Mr. Henderson authored the first zoning ordinance for the City of Creswell, Oregon, and the subdivision ordinances for the Cities of Fortuna and Rio Dell, California. For Humboldt County, California he supervised zoning and subdivision ordinance updates, and the preparation of ordinances implementing California’s Timberland Productivity Act, Agricultural Land Conservation Act, and Coastal Act.

Mr. Henderson’s permitting projects for Lane County, Oregon, and Humboldt County, California, included processing of subdivision reviews and approvals; processing of rezonings and zoning permits; processing of coastal development permits; and review and processing of state and federal environmental documents.

He served as Humboldt County’s Zoning and Permitting Administrator.

ENGINEERING ACCOMPLISHMENTS
Mr. Henderson designed, engineered, and managed the development of numerous minor and several major subdivision projects, the largest being the Rancho Bueno and Hilras Way Subdivisions in the City of Fortuna; and Liberty Bell Court and London Drive Subdivisions in the City of Eureka. He also designed and engineered several major site development projects including Nordstrom Apartment Complex PUD plan, Arcata; Eureka Mall grading plan, Eureka; Upper Rohner Creek drainage plan, Fortuna; and Newburg Road and Elizabeth Barcus Way road construction plans, Fortuna. Other types of his engineering projects and work included traffic and safety studies; water and sewer utility plans; construction surveying and inspections; and contract administration and management.

CEQA AND NEPA ACCOMPLISHMENTS
In both the public and private sectors, Mr. Henderson has authored and supervised the preparation of numerous CEQA documents. His significant work with CEQA environmental studies included supervising and authoring the Initial Study for development of the Forexco Natural Gas Field in the Eel River Basin of Humboldt County, California; the EIR for the Jackson Demonstration Forest Master Plan in Mendocino County, California; and the EIR for the Martin’s Slough Interceptor Sewer Line in the City of Eureka, California.

Mr. Henderson also supervised NEPA documents, including the EIS for the Exxon Oil Platform for the City of Eureka and County of Humboldt; the EIS for the South Humboldt Bay Dredging Project in Humboldt County; and the EIS for the Sewer Ocean Outfall Pipeline for Port Orford, Oregon.

OSCAR LARSON & ASSOCIATES
Larry Henderson (page 3)
Engineering • Planning • Construction Management 2019

PRESENTATION ACCOMPLISHMENTS
Mr. Henderson has given presentations throughout his professional career to decision-making officials and leaders at all levels…local to international. His presentations include work and testimony as part of the support staff, as a subject matter expert, or as a proponent or opponent of projects and proposals. Groups he has given presentations to include ad hoc committees, planning commissions, legislative bodies, State and Federal agencies, U.S. diplomats, and military commanders and advisors.

CONTRIBUTIONS:

In addition to Mr. Henderson’s professional accomplishments, he has contributed significantly to the community in several volunteer positions. He served as President of St. Bernard’s Catholic School Board of Directors and the Humboldt Taxpayers League, and as a board member for Blue Ox Community High School, Sacred Heart Catholic Church, and Eureka Theatre Restoration.

His public service positions included chairing the Humboldt County Workforce Investment Board and the North Coast Business Leaders Roundtable. He was a founding member and leader for the Citizens for Humboldt Bay Port Development and the North Coast Railroad Support Coalition.

He founded and is still active with Nascent Associates...an alliance with semi-retired, independent professionals in planning, engineering, permitting, and financing who promote and facilitate affordable housing projects.

Mr. Henderson now chairs the Humboldt Bay Harbor Work Group and is an active member of the East-West Railroad Alliance and the Timber Heritage Association. His current ‘specialinterest’ project is working with the College of the Redwoods to create a Public Safety Training Campus to serve Northern California and Southern Oregon coastal region.

Natural Resources Management Corporation
1434 Third St., Eureka, CA 95501 • ph: 707.269-1382; fax: 707.442-8823 • [email protected] • www.nrmcorp.com Prairie L. Moore
Vice President
Environmental Services Director
Professional Botanist

SUMMARY
Mrs. Moore is a botanist/ restoration ecologist with 12 years’ experience in a professional setting.

As a botanist she has conducted field research and surveys for rare plants, restoration monitoring, wetlands and fire effects in California and Washington. She has experience with both wetland delineation and wetland mitigation. She has designed studies in riparian restoration ecology with attention to succession and the effectiveness of various planting plans. Ms. Moore’s master thesis investigated restoring the understory plant species community in riparian forests. She has designed and overseen the implementation of numerous re-vegetation/ restoration projects in wetland and riparian environments. Ms. Moore has coordinated with agencies, land managers, principal investigators and field technicians to ensure studies were conducted in a rigorous manner. Mrs. Moore has excellent communications skills, both oral and written. She has 10 years of experience writing NEPA and CEQA reports. She has authored multiple Ecological Assessments, Biological Assessments, Biological Reports, Initial Studies, and Mitigated Negative Declarations. Ms. Moore has 10 years’ experience coordinating with different state and federal agencies during the CEQA and NEPA process. She has experience providing clients with Environmental Permitting assistance, and has secured numerous 401 and 404 certifications, CDFW 1600 permits, and Coastal Development Permits. She has experience monitoring construction projects for environmental permit guidelines. She is knowledgeable with GIS and data analysis. Ms. Moore is currently the director of NRM’s Environmental Services Department and acts as the project lead on all wetlands, vegetation, wildlife, fisheries and environmental permitting projects. Her duties include managing projects, writing reports, supervising biologists/ botanists and communicating with agencies, clients and other professionals.

PROFESSIONAL EXPERIENCE
Environmental Services Director, Natural Resources Management Corp., Eureka, CA (2012- current)
Staff Botanist, Natural Resources Management Corp., Eureka, CA (2009-2012) Interpretive Specialist, California State Parks, Weott, CA (2009) Research Scientist, California State University Chico, (2006-2008) Botanical Technician, North State Resources, Chico CA, (2008) Project Manger, Chico Research Foundation, Chico CA, (2008) Interpretive Specialist, California State Parks, Weott, CA, (summer seasons 2003-2004) Wetlands Nursery Worker, Fresh Water Farms, Eureka CA, (2002 – 2003) Field Research Assistant, University of California, Santa Cruz CA, (1999 – 2001)

EDUCATION
M.S., Botany, 2009, California State University Chico
B.A., Biology/ Ecology, 2001, University of California, Santa Cruz PRAIRIE L. MOORE
Environmental Services Director Page 2
Natural Resources Management Corporation

PROFESSIONAL AFFILIATIONS
California Native Plant Society, 2008- present

REFEREED PUBLICATIONS
Moore, P.L, K.D. Holl and D.M. Wood, 2011, Strategies for Restoring Native Riparian Understory Plants along the Sacramento River: Timing, Shade, Non-native control, and Planting Method. San Francisco Estuary and Watershed Science 9(2): 1-15

SELECTED NRM PROJECT EXPERIENCE
• Project Manager for NRM’s Third Party Regional Water Quality Control Board cannabis compliance program. Coordinate with Regional Water Quality Control Board and California Department Fish and Game. Oversee site visits, surveys, and the drafting of Water Resource Protection Plans, 1600 permit applications, Clean up and Restoration Plans and other documents required. (2016-2020)
• Lead author for wetland and riparian mitigation and restoration plan. Coordinated with the Regional Water Quality Control Board, and Trinity County to draft and implement a mitigation and restoration plan for a bridge replacement. (2016-2018) • Project lead for Ealison Apartments wetland delineation. Delineated wetlands on 2.5 acres of undeveloped property in Blue Lake California using the ACOE standards. GPS and flagged wetland area in the field. Authored wetland delineation report. (2015) • Writer/ Editor for Resource Management Plan/ Environmental Impact Statement and the Record of Decision for the Jarbridge office of the BLM. (2013 to 2015) • Project lead and technical author for CEQA and other permitting processes for a levee repair.

Coordinated with Costal Commission, California Department Fish and Game, Army Corps of Engineers, NOAA, US Fish and Wildlife, Regional Water Quality Control Board and local entities. Authored Initial Study and Biological Assessment. (2013) • Technical author for a BA and EA for the NEPA process involving a Forest Service visitor center construction project. Coordinated with the Forest Service and other entities. (2009) • Technical author of the CE and BA for the NEPA process involving a Forest Service plantation maintenance project. Coordinated with the Forest Service and other entities. (2010)
• Technical author of the CE and BA for the NEPA process involving a Forest Service fuels reduction and forest restoration project. Coordinated with the Forest Service and other entities. (2010)
• Project lead for wetland delineation, mitigation, and monitoring project at the Bear River Rancheria. Assisted with wetland design. Oversaw wetland construction. Coordinated and performed wetland sampling, report writing and future restoration efforts for five year monitoring plan. (2010-present)
PRAIRIE L. MOORE
Environmental Services Director Page 3
Natural Resources Management Corporation
• Project lead on environmental permitting process for private road development stream crossing. Coordinated with California Department Fish and Game, Army Corp of Engineers, Regional Water Quality Control Board, and local entities. (2012) • Author of the Re-vegetation Mitigation and Monitoring Plan for the city of Eureka’s water pipeline repair project. Created re-vegetation design and monitoring plan for riparian forest that was destroyed during pipeline installation. Monitored plant installation. Conducted first annual monitoring and authored monitoring report. (2014 to present) • Project lead for riparian restoration, mitigation, and monitoring project at the Bear River Rancheria. Created planting design. Oversaw plant installation. Coordinated and performed annual monitoring, report writing and future restoration efforts for five year monitoring plan. (2012-present)
• Project Manager for Biological Monitoring for the construction of mitigation areas for the Willits bypass project. Oversaw crew of 4 wildlife biologists monitoring construction.

Reviewed daily monitoring reports to ensure construction followed permit guidelines.

Coordinated directly with Caltrans and Faltiron (prime contractor) staff. (2014) • Project Manager for Northern Spotted Owl surveys on the Mendocino National Forest.

Oversaw wildlife technicians conducting the surveys. Authored weekly and final reports including GIS analysis. (2014)
• Wetland delineation and special status plant surveys for city of Eureka pipeline repairs.

Preformed wetland delineation, botanical surveys, overall site assessment and authored reports. (2012)
• Site Assessment for wetlands and special status botanical species for Fortuna pipeline repairs. (2012)
• Project manager for botanical surveys for special status species on timber lands. Coordinated and preformed field surveys and report writing. (2009 to present) • Project lead for Northern Spotted Owl, Osprey, Heron and Golden Eagle Surveys. Report writing and agency consultation. (2012 to present)
• Project manager for a riparian forest restoration project. Oversaw implementation of restoration plan. Coordinated and performed vegetation sampling, report writing and future restoration efforts. (2009 to 2013)
• Project manager for Forest Service vascular and nonvascular botanical surveys. Coordinated field work, biweekly submissions and final reports. Oversaw the field crew. (2010)

J . E r i c h R a u b e r, P. E ., G. E .

Geotechnical Engineer / Civil Engineer
Areas of Expertise
Project Management
Geotechnical Engineering
Civil Engineering
Environmental Engineering

P R O F E S S I O N A L E X P E R I E N C E
Mr. Rauber is a licensed Civil Engineer and Geotechnical Engineer in California with over 35 years of experience in civil and environmental engineering and project management. He has...
• Managed civil and environmental engineering projects; conducted geotechnical investigations and managed
design and construction oversight projects, and remediated contaminated sites. Projects included roads, water tanks, earth and concrete dams, mine sites, waterfront facilities, commercial developments, design/build projects, and rail facilities.
• Lead and/or participated in the design and construction of numerous landslide characterization slope stability analyses using a variety of analysis methods and software packages, and stabilization projects. Characterization techniques successfully employed include, seismic fraction surveys, drive sample/Pitcher Barrel/Core barrel sampling and core
evaluations, inclinometers and piezometers, surface
monument control. Stabilization measures successfully
employed include rock anchors, soldier pile and tie-back retaining walls, vertical and horizontal drains, micro-piles and shear pins, roller compacted concrete buttress and tiebacks, mechanically stabilized earth walls, Gabion walls, and earthen buttresses.
• Supervised and participated in solid-waste landfill design and operation plans. Designed and implemented seepage
control and interception and diversion of groundwater,
utilizing systems such as slurry trench cut-off walls, pumping wells, and collection trenches.
• Developed site characterization and clean up strategies for numerous CERCLA and RCRA sites, negotiated permits under the Clean Water Act, and successfully negotiated with state and federal regulatory agencies in several states and
regions.
• Coordinated preconstruction activities, prepared budgets and engineer’s estimates, and prepared final construction documents. He has solicited, reviewed and evaluated
contractor and subcontractor bids;understands critical path management and has extensive scheduling experience with several project management software packages.

Education
M.S. -Civil Engineering,University of
California, Berkeley
B.S.- Civil Engineering, University of
California, Berkeley
Registrations and Certifications
Geotechnical Engineer- California
Professional Engineer (Civil) - California,
Colorado,Oregon
Dormant:Kentucky. New Mexico,
Utah,Washington, and Alberta,
Canada
Professional Memberships
American Society of Civil Engineers
Sonoma County Alliance
Continuing Education and Training
OSHA 40 hour hazardous materials/waste
health and safety training and annual
8-hour refresher courses through the
'present
Understanding Migration, Assessment, and
Remediation of Non-Aqueous Phase
Liquids,National Groundwater
Association
Environmental Regulations,Resource
Conservation and Recovery Act
(RCRA) Regulations
Strong Ground Motion Seminar,
Earthquake Engineering Research
Institute
Project Management,Ira Bitz & Associates
Water Tank Replacement, Shelter Cove, California - Lead geotechnical engineer for the replacement of 6 potable water storage tanks with sizes varying from 30,000 to 900,000 gallons on unstable hillside slopes;two of the tank sites are on landslide debris. The San Andreas fault passes through the Shelter Cove community.

Developed recommendations to minimize future slope instability, subsidence, and earthquake damage.

New Shop Building, Class Rooms, and Multi-Purpose Building, Kelseyville Unified School District, Kelseyville, California -Project manager and lead geotechnical engineer for geotechnical investigation and geologic hazards evaluations for a New Shop Building and class rooms at Kelseyville High School, and Multi-Purpose Building at Kelseyville Elementary School.

Page 1 of 9 ends