In the event the Construction Manager does not concur with the estimate, the Contractor may make the changes necessary to obtain the Construction Manager's concurrence and resubmit the partial-payment estimate, or submit the original progress-payment estimate directly to the Owner's Representative, indicating in writing his reasons for refusing to make the changes necessary to obtain concurrence.

3. RETENTION: The Owner will retain a percentage of each payment except as specified below in accordance with Public Contract Code Section 7201. The retained amount is available for the protection and payment of the person, or persons, mechanics, subcontractors, or materialmen who perform labor or work under the contract, and persons who supply such person, persons or subcontractors with components and supplies for carrying on such work.

LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
00 72 00 – GENERAL CONDITIONS 31 of 37
The Owner will retain 5 percent of each progress payment.

Under no circumstances shall any provision of this section be construed to limit the ability of the Owner to withhold 150 percent of the value of any disputed amount of work from the final payment, as provided for in Section 7107 of the Public Contract Code. In the event of a good faith dispute, nothing in this section shall be construed to require the Owner to pay for work that is not approved or accepted in accordance with the proper plans or specifications.

4. WITHHOLDING: The Construction Manager may refuse to recommend the whole or any part of any payment if in the Construction Manager's opinion it would be incorrect to make such recommendation to the Owner. The Construction Manager may also refuse to recommend any payment, or because of subsequently discovered evidence or the result of any tests, may nullify any payment previously recommended to such extent as may be necessary in the Construction Manager's opinion to protect the Owner from loss as a result of:
a. Defective or damaged work.

b. A deductive change order.
c. Persistent failure of the Contractor to perform the work in accordance with the contract documents, including failure to maintain the progress of the work in accordance with the construction schedule. Persistent failure to maintain the progress of the work means that for a period of two consecutive months following a written notice from the Construction Manager, the Contractor fails to correct a behindschedule condition at a rate that would reasonably indicate that he will finish the project on schedule.
d. Disregard of authority of the Construction Manager or the laws of any public agency having jurisdiction.

The Owner may refuse to make payment of the full amount recommended by the Construction Manager because of claims made against the Owner on account of Contractor's performance or furnishing of the work or because liens have been filed in connection with the work or because there are other items entitling Owner to reduce the amount recommended. In such case, the Owner will give Contractor prompt written notice with a copy to the Construction Manager stating the reasons for each action.

5. STOP PAYMENT NOTICES: The Owner, by and through the Construction Manager or other authorized officers, may at its option and at any time retain out of any amounts due to the Contractor, sums sufficient to cover claims filed pursuant to Section 3179, et seq., of the Civil Code of the State of California.

6. PROMPT PAYMENT: Prompt payment for partial-payment estimates will be made in accordance to Public Contracts Code Section 20104.50.

D. FINAL PAYMENT:

On the condition that no liens or claims are outstanding, Owner will make final payment to the Contractor in the manner provided by law following the expiration of 35 calendar days after acceptance of the work and filing of the notice of completion by the Owner. Final payment must AUGUST 1, 2026 LIGHTHOUSE COVE - CABIN PROJECT
32 of 37 00 72 00 – GENERAL CONDITIONS
include the entire sum found to be due under this contract after deducting previous payments and such other lawful amounts as the terms of this contract describe. Prior estimates and payments, including those relating to extra work or work omitted, are subject to correction by the final payment.

Acceptance by the Contractor of final payments as acts as a release to the Owner of all claims by and all liability to the Contractor other than claims in stated amounts that may be specifically excepted by the Contractor for things done or furnished in connection with this work and for every act and neglect of the Owner and others relating to or arising out of this work. Payment by the Owner does not release the Contractor or his surety from any obligation under the contract or under the performance bond and payment bonds.

7.02 CHANGE ORDERS
A. GENERAL:

The Owner may, at any time, without notice to the sureties, by written order designated or indicated to be a change order, make any change in the work within the general scope of the contract, including but not limited to the following changes:

1. In the specifications (including drawings and designs).

2. In the method or manner of performance of the work.

3. In the Owner-furnished facilities, equipment, materials, services, or site.

4. Directing acceleration in the performance of the work.

Any other written order or an oral order (which terms as used in this paragraph shall include direction, instruction, interpretation, or determination) from the Owner, that causes any such change, must be treated as a change order under this clause, if the Contractor gives the Owner written notice stating the date, circumstances, and source of the order and if the Contractor regards the order as a change order.

Except as provided in this clause, no order, statement, or conduct of the Owner is or may be treated as a change order under this clause nor does it entitle the Contractor to an equitable adjustment.

If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any order, an equitable adjustment must be made and the contract modified in writing accordingly. However, except for claims based on defective specifications, claims will not be allowed for any costs incurred more than 20 days before the Contractor gives written notice as required.

Also, in the case of defective specifications for which the Owner is responsible, the equitable adjustment includes any increased cost reasonably incurred by the Contractor in attempting to comply with such defective specifications.

If the Contractor intends to assert a claim for an equitable adjustment under this clause, he must, within 30 days after receipt of a written change order or the furnishing of a written notice, submit to the Owner a written statement setting forth the general nature and monetary extent of such claim, unless the Owner extends this period. The statement of claim hereunder may be included in the notice.

LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
00 72 00 – GENERAL CONDITIONS 33 of 37
A claim by the Contractor for an equitable adjustment will not be allowed if it is asserted after final payment under this contract.

B. EXTRA WORK:

Extra work means providing materials and equipment and performing work not directly or by implication called for by the contract. Changes in measured quantity under a unit price contract or item are not extra work. If the Owner requires extra work he may (1) do it himself, (2) employ others to do it, (3) direct the Contractor to perform the extra work at unit bid price or a combination of such items, (4) direct the Contractor to perform the extra work at a mutually agreed upon lump sum, or (5) direct the Contractor to perform the extra work on a time and expense basis.

C. OMITTED WORK:

The Owner may, by written order to the Contractor, omit work, equipment, and material to be provided under the contract, and the value of the omitted work, equipment and material will be deducted from the contract price. The deducted value will be a lump sum or unit bid price agreed upon in writing by the Contractor and Owner based on the breakdown and cost information submitted by the Contractor.

D. UNIT BID PRICE CHANGE:

Increases or decreases in the quantity of a contract item of work that was bid on a unit basis will be made by comparing the total pay quantity of such item of work with the Construction Manager's estimate. When changes in quantities exceed 25 percent of the original bid quantity and the total dollar change of that bid item is significant, the Owner will review the unit price to determine if a new unit price should be negotiated. Methods for Changed Quantity Payment Adjustments shall be those specified in the Caltrans Standard Specifications, latest edition.

E. LUMP SUM CHANGES:

Whenever the Contractor is directed to perform extra work on a lump-sum basis, changes in contract price resulting from the extra work will be based on a mutually agreed upon lump-sum price.

The Contractor's proposal for such changes must include a detailed breakdown of labor and materials costs for the extra work to be performed by his forces and the forces of his subcontractors or material suppliers as may be required. The breakdown must include any labor surcharge and any sales- or use-tax cost. Whenever the Owner requests that the Contractor prepare a lump-sum price in connection with a change order, the Contractor is entitled to the costs incurred in the preparation of that price whether or not the lump-sum amount is finally accepted by the Owner. Those costs will be incorporated in the lump-sum amount.

Compensation for the extra work will be based on the direct costs as listed in the detailed proposal, plus a mutually agreed upon percent of direct costs for overhead and profit, plus one percent (1%) of those direct costs for bond. The allowance for overhead and profit must include full compensation for overhead, including superintendence, and additional overhead attributable to a time extension granted because of the change order and no separate charge may be made for overhead.

AUGUST 1, 2026 LIGHTHOUSE COVE - CABIN PROJECT
34 of 37 00 72 00 – GENERAL CONDITIONS
When the change order involves work omitted, the reduction of the contract price will be based on the direct costs listed in the detailed proposal submitted by the Contractor. An additional reduction may be made of an amount that is identified as reduced overhead costs attributable to the work omitted. No reduction will be made for profit originally attributable to the omitted work.

F. TIME AND EXPENSE CHARGES:

1. GENERAL: Whenever the Contractor is directed to perform extra work on a time and expense basis, he or she will maintain accurate records. Each day a record of labor, materials, and equipment costs will be submitted to the Construction Manager for verification. These records will reflect the actual and necessary expenses pertaining to the extra work and will be available for audit. Audits conducted under this provision must be in accordance with generally accepted auditing standards and established procedures and guidelines of the reviewing or audit agency(ies).

Payment to the Contractor for extra work performed on a time-and-expense basis will consist of the actual necessary expense for doing the extra work, plus an allowance of 15 percent of labor, material and equipment rental for overhead, general superintendence and profits, plus one percent (1%) of those direct costs for bond. This basis of payment applies to work done directly by the Contractor and to work done by a subcontractor, except the one percent (1%) allowance for bond does not apply to work performed by a subcontractor. When the work is done by a subcontractor, the Contractor may add five percent (5%) to the subcontractor's charges to cover overhead and profit and one percent (1%) for bond.

In determining time-and-expense compensation, the term "actual necessary expense" means the sum of (1) materials and equipment, (2) labor, (3) supervision, (4) construction equipment, (5) professional services, and (6) other costs. “Charges” for such items means the actual cost whether incurred by the Contractor, a subcontractor or others. The items making up "actual necessary expense" are defined as follows.

2. MATERIALS AND EQUIPMENT: Materials and equipment means costs for materials and equipment provided by the Contractor and necessarily used in the work includes applicable taxes.

3. LABOR: The cost of labor will be the sum of actual wages paid, labor surcharge, and subsistence and travel allowances. Actual wages paid include employer payments to or on behalf of the worker for health and welfare, pension, vacation and similar purposes. The labor surcharge includes applicable labor-related taxes, Workers Compensation Insurance premiums, public liability and property damage insurance premiums, and other legally required costs directly related to labor. Where subsistence and travel allowance are required for performance of extra work, the charges include the actual amount paid to each worker for these items.

4. SUPERVISION: If, in the Owner's judgment, full-time supervision of the extra work is required, it will be authorized in writing by the Construction Manager and charges for that supervision will be included as an actual necessary expense. Charges for supervision of the extra work by the Contractor's representative are not part of actual necessary expense.

5. CONSTRUCTION EQUIPMENT: Charges for the use of construction equipment required in the performance of extra work will be based on rental rates set forth in the State of California then-current official published document covering rental of equipment used on force account work. For equipment not listed in that document, the rental rate will be as listed by the LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
00 72 00 – GENERAL CONDITIONS 35 of 37
local section of the Associated General Contractors. If the equipment is not listed by the Associated General Contractors, the rental rate will be mutually agreed upon in writing between the Contractor and Owner prior to the use of the unlisted equipment. The reasonable cost of moving equipment onto and off the job site will be included, but equipment rental will not be paid when the equipment is inoperative due to breakdowns. Individual pieces of equipment or small tools having a replacement value of $100 or less are considered expendable and no payment will be made for these.

When equipment is used on the extra work for less than five days, hourly rates will be used.

Less than 30 minutes of operation is considered one-half hour of operations. When equipment is used on the extra work for more than five days, daily rates apply. In that case, less than four hours of operation is considered to be one-half day of operation.

6. PROFESSIONAL SERVICES: Professional services are included in "actual necessary expense" provided both that the Owner has determined that such services are necessary and the Construction Manager has authorized in writing the provision of such services.

7. OTHER COSTS: Charges for items not included in paragraphs 7.02 F.1 through 6 may be included as "actual necessary expense" if such additional items are authorized in advance and in writing by the Construction Manager.

7.03 CHARGES TO CONTRACTOR
Everything charged to the Contractor under the terms of this contract must be paid by the Contractor to the Owner on demand. Such charges may be deducted by the Owner from money due or to become due to the Contractor under the contract. The Owner may recover such charges from the Contractor or from his surety.

7.04 COMPENSATION TO OWNER FOR TIME EXTENSION
The Owner, in exchange for granting an extension of time for avoidable delay, must be compensated by the Contractor for the actual costs to the Owner of engineering, inspection, general supervision, and overhead expenses that are directly chargeable to the work and accrue during the period of such extension. The actual costs do not include charges for final inspection and preparation of the final estimate by the Owner.

7.05 SUBSTANTIAL COMPLETION
The Contractor, upon considering the work to be substantially complete and ready for its intended use, shall so notify the Construction Manager in writing. The notification must include an itemized list of remaining incomplete work. If the Construction Manager determines that the work is not substantially complete, he or she will so notify the Contractor in writing identifying the reasons for such a determination. If the Construction Manager finds the work substantially complete, he or she will meet with the Contractor to (1) prepare a punch list of incomplete items of work; (2) define the division of responsibility between Owner and Contractor with respect to security, operation, maintenance, utilities, insurance, and warranties; and (3) describe any other issues related to acceptance of the substantially completed work. Upon reaching agreement with the Contractor, the Construction Manager will write to the Owner, certifying that the work is substantially complete, listing the items of incomplete work, stating the date for completion of incomplete work, defining the division of responsibilities, and setting forth any other terms related to acceptance.

AUGUST 1, 2026 LIGHTHOUSE COVE - CABIN PROJECT
36 of 37 00 72 00 – GENERAL CONDITIONS
The Owner, who has sole discretion for determination of substantial completion, will review the Construction Manager's certification that the work is substantially complete and concurring with that certification, will notify the Contractor, in writing, that the work is accepted as substantially complete. Except for any portion(s) of work specified for early completion or required by the Owner for early possession (paragraph 00 72 00-7.06), substantial completion will not occur for any work until the entire project is ready for possession and use. The acceptance notice will include a punch list of incomplete work items, set the date for their completion, describe the division of responsibility between the Owner and Contractor, and describe any other terms of acceptance. The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all of its terms and provisions.

Upon receipt of the Contractor's acknowledgment letter, the Owner may take possession of the work or portion of the work and put it into its intended service. The date that the work or portion of the work is put into service will become the date of substantial completion. Unless otherwise specified, warranties will begin on the date of substantial completion.

Subsequent to the substantial completion date, the Owner may exclude the Contractor from the work during such periods when construction activities might interfere with the operation of the project. The Owner, however, shall allow the Contractor reasonable access for completion or correction of incomplete punch list items.

7.06 POSSESSION OF PORTIONS OF THE PROJECT
Should the Contractor fail to meet any date specified for substantial completion of the work or any portion of the work requiring early possession and use by the Owner, the Owner may, after a 10-day written notice to the Contractor, take over such portion or all of the work that is behind schedule. In such case, the Construction Manager will prepare a punch list of incomplete work. The Owner may allow the Contractor reasonable access to the work at such times that the operation of the project will not be affected, or the Owner may complete the work itself after giving the Contractor notice of his intention to do so. The cost of Owner's work will be charged to and deducted from amounts due to the Contractor. The substantial completion date will be established as the date when the Owner begins using the project or a portion of the project for its intended purpose. Division of responsibilities between Owner and Contractor, beginning of warranties, and any other issues relating to substantial completion will be as specified in paragraph 00 72 00-7.05.

7.07 ACCEPTANCE OF THE PROJECT
Upon completion of the work, including portions of the work previously accepted as substantially complete, the Contractor must notify the Construction Manager, in writing, that the work is complete. Upon receipt of the notification, the Construction Manager will determine if the work conforms to the terms of the contract. If the Construction Manager finds materials, equipment, or workmanship that do not meet the terms of the contract, he or she will prepare a punch list of nonconforming items and submit it to the Contractor. Following completion of the corrective work by the Contractor, the Construction Manager must notify the Owner that the work has been completed in accordance with the contract. Final determination of the acceptability will be made by the Owner.

Upon acceptance of the project, the Owner will immediately file a notice of completion. For portions of the project not previously accepted as substantially complete, the conditions of guarantee commence on the date that the Owner files a notice of completion.

The final application for payment must be accompanied by all required documentation called for in the contract, including complete and legally effective releases or waivers of liens in a form LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
00 72 00 – GENERAL CONDITIONS 37 of 37
acceptable to Owner. Subject to prior approval of Owner, Contractor may submit in lieu of the lien releases and waivers: (1) receipts of releases in full; (2) an affidavit that the releases and receipts cover all labor, services, materials, and equipment for which a lien could be filed and that all payrolls, materials, and equipment bills and other indebtedness connected with the work for which Owner or Owner's property might in any way be responsible have been paid or otherwise satisfied; and (3) consent of the surety, if any, to final payment. If any subcontractor or supplier fails to furnish a release or receipt in full, Contractor may furnish a bond or other collateral satisfactory to Owner to indemnify Owner against any lien.

If, after reviewing the Contractor's final application for payment, including all documentation required, the Construction Manager determines that the work is complete, he or she will recommend that final payment, including all retainages, be made by the Owner. The final payment will be due and payable by the Owner within 30 days after any legal notice periods have expired.

END OF SECTION

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
1 of 8
SECTION 01 03 00

SPECIAL PROJECT PROCEDURES
PART 1 — GENERAL

1.01 SECTION INCLUDES
A. This section includes responsibilities and requirements of the Contractor specific to this project.

PART 2 — PRODUCTS (Not Used)
PART 3 - EXECUTION

3.01 INSTALLATION
A. Provide all labor, equipment and material required for the execution of the work including, but not limited to the following:

1. Daily containment and removal of all sanitary debris, work debris and trash resulting from any work activities.
a. Disposal locations for sanitary debris and/or hazardous materials shall be legally certified to accept these materials. Disposal locations for any sanitary debris and/or hazardous materials shall be approved prior to disposal.
b. Manifests of hauling and disposal of such material shall be submitted to the Owner’s Representative by the Contractor.

Hauling and disposal costs will be borne by the Contractor.

2. Coordinate with all trades the work by other utility Owners and jurisdictional agencies, as well as other Owner’s work occurring at or near the project location.
a. Advise the Owner’s Representative as to any discrepancies in the work of others that could affect the work in this project and cooperate with the direction provided.

3. Complete field engineering and layout required. Layout of the Cabins to be provided by the City.

4. Protect work in progress and finished work until the project is completed and final acceptance is granted by the Owner.
a. Project work by others when it affects work in this project or becomes part of this project.

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
2 of 8

5. Project Meetings:
a. Arrive on time
b. Bring:
i. Authorized field representative(s)
ii. Authorized office representative(s)
iii. Each authorized, capable and responsible for committing to delivery, manpower and completion dates for their
work.

6. Complete and submit to Owner’s Representative:
a. Forms, schedules, narratives and reports (including technical data reports and forms) as required by these specifications or as directed in accordance with the project Documents.
i. Failure to submit these in an acceptable and completed manner, and on time could result in a delay in payment.

7. Change Order work will be agreed upon in writing and signed by the Owner before the applicable work may begin.

8. To properly monitor and protect all materials and Owner assets from damage resulting from Contractor’s work activities or weather. a. Damaged materials or assets will be replaced at Contractor’s cost.
b. Cost will be assessed by back charge or other means allowed by the Contract Documents.

9. Work Hours:
a. Work within defined work hours - typically 8:00 am to 5:00 pm Monday through Friday, except for defined holidays. Due to existing guest presence within the park, all equipment, motors, compressors and battery powered devices must
not be on or engaged prior to 8:00 a.m.
b. Other hours may be directed by the Owner or Owner’s
Representative or may be negotiated with the Contractor. c. Work within a public Right-of-Way.

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
3 of 8
i. Comply with local jurisdiction and State DOT
requirements for defined work hours and days.
d. To perform all necessary overtime as ordered, to get their work back on schedule, if necessary.
i. If premium time is required by any other Contractor(s) to bring the project back to the original schedule, the cost of such premium time shall be borne solely by this
Contractor. Contractor is subject to repayment of
additional cost incurred by the Owner due to Owner’s
staff’s overtime or premium time necessary to monitor the Contractor’s efforts to bring the Work back on schedule or complete a task that requires work outside of normal work hours.
ii. Such overtime shall be governed by the requirements and restrictions of the Contract Documents and any
applicable jurisdictional permits and shall not violate any noise ordinances or pose any danger or undue nuisance
to the public.

10. Perform punch list work in a timely manner or be subject to Owner overhead costs. Punch list items, and completion of such items, will be created and completed as stipulated in this Specification. a. Contractor shall first review the Work and develop a punch list. b. Contractor shall provide a copy to the Owner’s Representative. c. Contractor shall complete the work on his punch list and provide the Owner’s Representative with a signed-off copy.
d. Owner’s Representative will review the Work and if determined to be reasonably complete will develop a punch list. If in the opinion of the Owner’s Representative, the Work is determined not to be reasonably complete, the Contractor shall be advised to bring the Work closer to a point of completion that warrants a punch list by the Owner’s Representative.
e. Contractor shall complete the items on the list provided by the Owner’s Representative. At an agreed upon schedule the
Owner’s Representative and the Contractor shall review the progress and the completion of each punch list item.
f. Owner overhead costs will be established and provided to the Contractor.

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
4 of 8
g. Owner overhead costs will be assessed if punch list items are not completed on the agreed upon schedule and reoccurring inspections are required.
h. Overhead cost will be based on total job-related costs of the Owner and will be assessed against the retainage.

11. Provide certificates of insurance prior to mobilization to the job site.

12. Provide a current copy of the workman’s compensation and liability insurance certificate prior to commencing work. Maintain insurance current and provide proof throughout project. Provide insurance coverage on all Contractor’s equipment and tools against theft and damage.
a. No claims will be registered against the Owner for loss or damage of same.
b. The Contractor will not lien the project for payment of any claims on equipment loss or damage due to vandalism of any other form.

13. Workplace Safety:
a. Meet or exceed minimum OSHA requirements.
b. Safety requirements from Owner's Representative, supervising or Field personnel will be considered only if the instructions are stricter than those in OSHA requirements.
c. The Contractor shall maintain all responsibility for initiating, maintaining, and supervising all safety precautions and programs in connection with the Work.

14. Contractor Vehicles:
a. Personal vehicles shall not be parked at the specific work sites. b. All vehicles at the work site must be the property of the Contractor and marked with an identifiable company sign.

15. Changes to Work:
a. Respond to all change notifications within 24 hours. b. Provide the Owner’s Representative with the complete and detailed change estimate cost data within 7 calendar days of notification.

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
5 of 8

16. Contractor shall provide full-time onsite dedicated qualified and suitable supervision of the Work.
a. Notify Owner’s Representative of name, qualifications and contact information for person designated to perform onsite supervision.
b. Notify Owner’s Representative of change of onsite supervisor immediately. No change shall be permitted without Owner’s written permission.
c. Person designated to perform onsite supervision shall have no other responsibilities.

17. Perform work in accordance with agreed upon Schedule:
a. Provide any necessary measures required to achieve and maintain this schedule at no additional cost to the Owner, Program Manager and Owner’s Representative.

B. The following provisions apply regarding the interpretation of Contract Documents:

1. The Contract Documents are complementary; what is required by one is as binding as if required by all.

2. Bring any discrepancies between the drawings and specifications to the attention of the Owner’s Representative immediately.

3. Except as may be otherwise specifically stated in the Contract Documents, or as otherwise directed by the Owner’s Representative, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, other specification, manual, or instruction (whether or not specifically incorporated by reference in the Contract Documents).

4. The Contractor shall assume that the most stringent provisions among the Contract Documents will apply.

C. Overflows/Spills and Damage to Property and Utilities:

1. Schedule and perform the Work in a manner so as to not cause or contribute to incidences of sanitary sewer overflows (SSOs).

2. If Contractor’s activities cause or contribute to spills or SSOs, then Contractor shall:

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
6 of 8
a. Immediately take appropriate action to contain and/or stop the overflow;
i. Cleanup the spillage,
ii. Disinfect the area affected by the SSO or spill.
b. Simultaneously, notify the Owner’s Representative
i. Provide information concerning location, cause,
volume of the SSO, and
ii. Assessment whether the spill entered a stream or
storm drain.
c. The Contractor will be familiar with the details of spill response plan detailed in the Sanitary Sewer Overflow (SSO) Response and Prevention Resource Book, approved by Owner’s
Representative.

3. Indemnify and hold harmless the Owner, the Program Manager and the Owner’s Representatives for any fines or third-party claims for personal or property damage arising out of an SSO or spill fully or partially the responsibility of the Contractor.

4. Including the legal, engineering, and administrative expenses of the Owner, and Owner’s Representatives in defending such fines and claims.

5. Any damage to public or private property due to the work performed by the Contractor is the sole responsibility of the Contractor. a. Damage to municipal or private utilities shall be repaired in a manner approved by the Owner at the Contractor’s expense. b. Damage to utilities or property belonging to other entities shall be repaired by the Contractor to the satisfaction of the utility/property owner at the Contractor’s sole expense. c. Equipment stuck or left in the sewer line/lateral shall be retrieved by the Contractor immediately at the sole expense of the Contractor. All necessary precautions to avoid a spill or SSO shall be employed immediately and maintained until safe service is provided.
d. Notify the Owner, and Owner’ Representative prior to initiating retrieval.

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
7 of 8
e. Damage to the Contractor’s equipment is the Contractor’s sole responsibility.
f. Equipment stuck or left in the sewer line/lateral that causes a SSO or spill.
g. Contractor is liable for the SSO or spill and all associated damages.

6. The Owner and/or the Program Manager reserves the right to make any repairs or retrieve any equipment and charge the Contractor accordingly.

D. Relocations

1. Relocate (including all associated work) structures, such as:
a. light poles,
b. fences,
c. piping,
d. conduits,
e. and drains interfering with the positioning and execution of the Work.

2. Work so ordered will be paid for at the Contract unit prices, if applicable, or as extra work under the Allowance Bid Item. Reference Section 01015 Part 3 – Execution Installation 3.01 G. Protection and Relocation of Existing Structures and Utilities.

E. Effective and suitable temporary provisions necessary for public safety resulting from such relocations, shall be provided by the Contractor at no additional cost to the Owner.

F. Existing Underground Piping, Structures, And Utilities

1. Existing water, gas, telephone, electrical, cable or other utility lines may be existing and may not be indicated on the drawings.
a. Exercise extreme care before and during any excavation activity to locate, preserve, protect and flag these lines so as to avoid damage to the existing lines.
b. Should damage occur to an existing line that was located by USA or by City staff prior to excavation, the Contractor shall repair or pay for repairs to the line to the satisfaction of the

LIGHTHOUSE COVE - CABIN PROJECT
01 03 00 – SPECIAL PROJECT PROCEDURES
8 of 8
utility owner and at no cost to the Owner. If the Owner of the utility requires the use of his own forces to repair the damaged lines, then the Contractor shall pay for all repair costs.

2. Locations of existing underground piping and utilities shown on the Drawings:
a. Are shown without express or implied representation, assurance, or guarantee they are complete or correct, or that they represent a true picture of underground piping to be encountered.
b. Existing piping and utilities interfering with any assessment or construction shall be rerouted.
i. Prior to rerouting, the Contractor must notify the
Owner’s Representative of the location of the pipeline
or utility; and
ii. Reroute or relocate the pipeline or utility as directed.

3. The Contractor shall carefully protect existing utilities that do not interfere with project work. Existing utilities damaged in any way by the Contractor shall be restored or replaced by the Contractor at its expense as directed by the utility owner and the Owner’s Representative.

G. Water for Construction Purposes

1. Water required for the work identified in the Contract may be furnished by the Owner if readily available connections are present. Connections can only be made as approved by the Owner’s Representative.

2. A backflow preventer and calibrated metering device meeting the requirements of the Owner shall be installed in each connection to the Owner’s potable water supply.

END OF SECTION
LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 11 00 - SUMMARY OF WORK 1 of 3
SECTION 01 11 00

SUMMARY OF WORK

1.01 GENERAL
A. The following Summary of Work is not meant to be an all-inclusive description of every item of Work necessary for a complete project. This Summary of Work is meant to aid the Contractor in developing an accelerated understanding of the basic project requirements.

B. Descriptions that are included in this Summary of Work will be considered part of the Specifications and Contract.

1.02 HAZARDOUS MATERIALS

The project does not disturb any pre-existing structures. No hazardous materials are anticipated. Contractor to notify City of any hazardous materials appear on site.

1.03 WORK PERFORMED BY THE CITY, AND IS NOT A PART OF THIS CONTRACT AS

CURRENTLY BIDDING
A. All water, sewer, power and other utilities being supplied to the Cabins will be extended, routed to, and connected to the Cabins by the City.

B. City shall provide at least two corners for the layout of each cabin, and an elevation bench mark adjoining each of the two camp / cabin sites.

C. Obtaining the Coastal Development Permit – the City already has the permit, allowing the work and establishing the location of the Cabins and the required setbacks from the environmentally sensitive areas.

D. The Coastal Development Permit requirements for environmental landscaping is being handled by the City and is not a part of this contract.

1.04 WORK COVERED BY CONTRACT DOCUMENTS
A. DESCRIPTION OF WORK:

1. The location of the project is 900 Sunset Circle, Crescent City, California.

2. Generally, the Work consists of furnishing all labor, materials, equipment and incidentals, and performing all work required to complete the project.

Where Owner supplies equipment, Contractor is responsible for all other items to create a fully functional system. The work includes, but is not limited to:

Bid Item 1: MOBILIZATION AND SITE BMPs
A. Mobilization costs including the costs of bonds and insurance, and any other project associated costs not included in the other pay items listed below.

LIGHTHOUSE COVE RV PARK - APARTMENT REMODEL JUNE 1, 2026 01 11 00 - SUMMARY OF WORK 2 of 3
Bid Item 2: STORM WATER BEST MANAGEMENT PRACTICES (BMPs) – Contractor is at a minimum responsible for the following BMPs:.

1. Temporary Concrete Washout – Provide an impervious temporary vessel to hold the washout from the concrete placement operations. Contractor is responsible for removing the vessel and all concrete waste material.

2. Cover all soil and material stockpiles on sites prior to rain events.

3. Dust control through moisture control.

4. Vehicle tracking controls. Remove any large clods from gravel roadway and clean pavement if tire tracking makes it to any of the paved surfacing.

5. Waddles or sandbags to prevent site water from leaving the two cabin sites prior to project completion.

6. Debris removal. No uncontained waste debris are to be stockpiled on site.

Bid Item 3: CABIN FOUNDATIONS AND DRAIN ROCK – Layout and remove the sod within the footprint of the cabins. Compact subgrade and place a minimum of 6 inches of compacted aggregate base rock. Base rock required provide a level strip footing should not exceed 10 inches in depth. Form and pour strip footings per plan. Include geotextile fabric and drain rock in this bid item for the area under the cabins.

Bid Item 4: SET CABINS - Furnish and install 8” prefabricated metal piers, and level cabins.

Minimize finish floor height as much as reasonable to maintain access under the cabins. Set piers in locations shown on the cabin drawings. Furnish and install all materials to set cabins on the Xi2 HCD approved permanent foundation, using the concrete strip footing option. Contractor to remove the wheels, but the axles may remain. The wheels are to be made available to the City.

Bid Item 5: CABIN SKIRTING - Furnish and install all skirting materials for cabins. The utility connections are not a part of this contract. Contractor to coordinate with City on location of utility penetrations to avoid potential conflicts. Penetrations and hole sawing to be performed by the City.

Bid Item 6: ADA PARKING STALLS - Confirm path of travel grades and elevations once cabin finish floor elevations are set. Furnish and install ADA parking stalls per plan based off the finish floor elevation of the cabins to maintain ADA compliance.

Bid Item 7: ADA RAMP AND HANDRAILS: Furnish and install ADA concrete ramp and handrails per plan, based off the finish floor elevation of the cabins.

Bid Item 8: CEDAR DECKS - Furnish and install all components of the western red cedar deck, including guardrails, stairs and footings.

Bid Items 1 – 8 conclude the base bid.

Bid Additive - Item 9: Cabin delivery is tentatively scheduled for the week of September 7th. City is working with the factory to hold the cabins to align the completion of the strip footings with the cabin delivery. If the cabins arrive prior to the completion and cure of the strip footings, the cabins will be placed within the Lighthouse Cove RV Park. The Contractor’s responsibility for this bid additive is to move the cabins from their stored location to their respective strip footings. The cabins come on wheels with a 2 ½” ball hitch.

B. CONTRACTOR’S DUTIES:

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 11 00 - SUMMARY OF WORK 3 of 3

1. Except as specifically noted, Contractor is to provide and pay for:
a. Labor, materials, and equipment;
b. Tools, construction equipment, and machinery;
c. All other facilities and services necessary for proper execution and completion of work, including commissioning.

2. Building demolition as needed and indicated on the plans. Obtain all necessary Air Quality Management District permits to perform lead paint and asbestos removal. Disposal of hazardous materials shall conform to all State regulations.

3. Prepare a Construction Schedule and Schedule of Values and receive approval from the Owner as required by these Contract Documents.

4. Procure and maintain all insurance and bonds required by these Contract Documents.

5. Comply with codes, ordinances, rules, regulations, orders, and other legal requirements of public authorities which bear on performance of the Work.

6. Promptly submit written notice to Engineer of observed variance of contract documents from legal requirements.

7. Enforce strict discipline and good order of the employees. Do not employ on work:
a. Unfit persons; or persons not skilled in assigned tasks.

C. PERMITS AND AGREEMENTS:

Obtain and comply with all permits not specifically obtained by Owner.

END OF SECTION
LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
01 11 05 – CONTRACT TIME 1 of 1
SECTION 01 11 05

CONTRACT TIME

1.0 COMPLETION SCHEDULE
Work must be completed by December 15, 2026. Time is of the essence, and the Contractor is encouraged to start as soon as possible.
10 days after Notice to Proceed, contractor must provide a project schedule, including procurement and tentative subcontractor scheduling dates.

END OF SECTION
LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
01 20 00 – MEASUREMENT AND PAYMENT 1 of 1
SECTION 01 20 00

MEASUREMENT AND PAYMENT

1.0 GENERAL
A. LUMP SUM PAYMENT ITEMS:

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the Bid Schedule and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

B. UNIT PRICE PAYMENT ITEMS:

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the Bid Schedule and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

END OF SECTION
LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
01 74 23 – FINAL CLEANING 1 of 2
SECTION 01 74 23

FINAL CLEANING

1.0 GENERAL
A. At the completion of work and immediately prior to final inspection, cleaning of the entire project shall be accomplished according to the following provisions:

1. The Contractor shall thoroughly clean, sweep, wash, and polish all work and equipment provided under the contract, including finishes. The cleaning shall leave the structures and site in a complete and finished condition to the satisfaction of the Construction Manager.

2. All subcontractors shall similarly perform, at the same time, an equivalent thorough cleaning of all work and equipment provided under their contracts.

3. The Contractor shall remove all temporary structures and all debris, including all nails, dirt, sand, gravel, rubbish and waste material.

4. Should the Contractor not remove rubbish or debris or not clean the facilities and site as specified, the Owner reserves the right to have the cleaning done at the expense of the Contractor.

5. Only experienced workers, or professional cleaners, shall be employed for final cleaning.

6. Only cleaning materials recommended by the manufacturer of surface to be cleaned shall be used.

7. Cleaning materials shall be used only on surfaces recommended by the cleaning material manufacturers.

8. In preparation for substantial completion or occupancy, a final inspection of sight-exposed surfaces, and of concealed spaces, shall be conducted.

9. Grease, dust, dirt, stains, labels, fingerprints, and other foreign materials shall be removed from sight-exposed finished surfaces. Polish surfaces so designated to shine finish.

10. Marred surfaces shall be repaired, patched, and touched up to specified finish, to match adjacent surfaces.

11. Materials shall be handled in a controlled manner with as few handlings as possible. Do not drop or throw materials from heights.

LIGHTHOUSE COVE - CABIN PROJECT AUGUST 1, 2026
2 of 2 01 74 23 – FINAL CLEANING

2.0 OWNER OCCUPANCY
As a condition precedent to final acceptance or release of a portion of the facility for use by the Owner, the Contractor and all subcontractors shall thoroughly clean all surfaces to leave same in first-class condition.

3.0 POST-CONSTRUCTION REPAIRS
The Contractor shall make such minor repairs and alterations as may be necessary to make any structure or component ready for occupancy. This section shall not apply after or to the extent that the Owner has taken possession of a portion of the facilities on which the Contractor has performed work.

4.0 SITE CLEANUP
A. For all roadway work, the Contractor shall conform the work to acceptable line and grade, as determined by the Engineer. In addition, the Contractor shall have the sidewalks and streets affected by the work swept by a street or sidewalk cleaner as determined by the Construction Manager. Other surfaces of the grounds shall be rake cleaned. The Owner will not authorize final payment until the Contractor has removed all rubble and debris from the street and adjoining work areas, including all temporary storage and parking areas used by the Contractor.

B. For pipelines, storm sewers, catch basins and manholes, prior to their activation or at the conclusion of the project, the Contractor shall thoroughly clean all of the new pipes by flushing with water for fluid lines. Debris cleaned from the lines shall be removed from the lowest access point.

C. All temporary utility drops, fencing, and water supply outlets shall be removed.

D. All plant gate identification signs, barricades, tools, rubbish collection receptacles and other such items shall be removed by the Contractor.

END OF SECTION
LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 33 00 - SUBMITTALS 1 of 5
SECTION 01 33 00

SUBMITTALS

1.0 GENERAL
Submittals covered by these requirements include manufacturers' information, shop drawings, test procedures, test results, samples, requests for substitutions, and miscellaneous work-related submittals. Submittals also include, but are not limited to, all mechanical, electrical and electronic equipment and systems, materials, reinforcing steel, fabricated items, and piping and conduit details. The Contractor shall furnish all drawings, specifications, descriptive data, certificates, samples, tests, methods, schedules, and manufacturer's installation and other instructions as specifically required in the contract documents to demonstrate fully that the materials and equipment to be furnished and the methods of work comply with the provisions and intent of the contract documents.

2.0 CONTRACTOR'S RESPONSIBILITIES
The Contractor will be responsible for the accuracy and completeness of the information contained in each submittal and must assure that the material, equipment or method of work will be as described in the submittal. The Contractor must verify that all features of all products conform to the specified requirements. Submittal documents must be clearly edited to indicate only those items, models, or series of equipment, which are being submitted for review. All extraneous materials must be crossed out or otherwise obliterated. The Contractor must ensure that there is no conflict with other submittals and notify the Construction Manager in each case where his submittal may affect the work of another contractor or the Owner. The Contractor must coordinate submittals among his subcontractors and suppliers including those submittals complying with unit responsibility requirements specified in applicable technical sections.

The Contractor must coordinate submittals with the work so that work will not be delayed.

The Contractor shall coordinate and schedule different categories of submittals, so that one will not be delayed for lack of coordination with another. No extension of time will be allowed because of failure to properly schedule submittals. The Contractor must not proceed with work related to a submittal until the submittal process is complete. This requires that submittals for review and comment must be returned to the Contractor stamped "No Exceptions Taken" or "Make Corrections Noted."
The Contractor shall certify on each submittal document that he has reviewed the submittal, verified field conditions, and complied with the contract documents.

The Contractor may authorize in writing a material or equipment supplier to deal directly with the Construction Manager or with the Owner with regard to a submittal. These dealings will be limited to contract interpretations to clarify and expedite the work.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
2 of 5 01 33 00 – SUBMITTALS

3.0 CATEGORIES OF SUBMITTALS
A. GENERAL:

Submittals fall into two general categories; submittals for review and comment, and submittals which are primarily for information only. Submittals that are for information only are generally specified as PRODUCT DATA in Part 2 of applicable specification sections.

A copy of each specification section, with addendum updates included, and all referenced and applicable sections, with addendum updates included, with each paragraph check-marked to indicate specification compliance or marked to indicate requested deviations from specification requirements. Check marks () denote full compliance with a paragraph as a whole. If deviations from the specifications are indicated, and therefore requested by the Contractor, each deviation must be underlined and denoted by a number in the margin to the right of the identified paragraph, referenced to a detailed written explanation of the reasons for requesting the deviation. The Construction Manager will be the final authority for determining acceptability of requested deviations. The remaining portions of the paragraph not underlined will signify compliance on the part of the Contractor with the specifications. Failure to include a copy of the marked-up specification sections, along with justification(s) for any requested deviations to the specification requirements, with the submittal will be sufficient cause for rejection of the entire submittal with no further consideration.

The Contractor shall submit a submittal schedule listing all submittals and associated submittal dates. Two separate lists must be provided: submittals for review and comment and product data (submittals) for information only. No submittals will be reviewed without a submittal schedule. Three (3) copies of the submittal schedule must be provided to the Construction Manager within 15 days of the pre-construction meeting. The schedule must be updated weekly with approval or rejection notes and dates, re-submittals with associated dates, and any additional information as required by the Construction Manager.

The Contractor shall maintain an accurate submittal log in a form acceptable to the Construction Manager, for the duration of the Contract. Show current status of all submittals at all times. Make the submittal log available for the Construction Manager’s review upon request and with each submittal.

B. SUBMITTALS FOR REVIEW AND COMMENT:

All submittals except where specified to be submitted as product data for information only must be submitted by the Contractor to the Construction Manager for review and comment.

C. SUBMITTALS (PRODUCT DATA) FOR INFORMATION ONLY:

Where specified, the Contractor shall furnish submittals (product data) to the Construction Manager for Information only. If the Construction Manager is dissatisfied with any submittal, submitted as Product Data, or for information only, they may be reviewed and commented upon.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 33 00 - SUBMITTALS 3 of 5

4.0 TRANSMITTAL PROCEDURE
A. GENERAL:

Unless otherwise specified, submittals regarding material and equipment must be accompanied by Transmittal Form 01300-A specified in Section 00 62 00. A separate form must be used for each specific item, class of material, equipment, and items specified in separate, discrete sections, for which the submittal is required. Submittal documents common to more than one piece of equipment must be identified with all the appropriate equipment numbers. Submittals for various items may be made with a single form when the items taken together constitute a manufacturer's package or are so functionally related that expediency indicates checking or review of the group or package as a whole.

A unique number, sequentially assigned, must be noted on the transmittal form accompanying each item submitted. Original submittal numbers will have the following format:
"XXX"; where "XXX" is the sequential number assigned by the Contractor. Resubmittals will have the following format: "XXX-Y"; where "XXX" is the originally assigned submittal number and "Y" is a sequential letter assigned for resubmittals, i.e., A, B, or C being the 1st, 2nd, and 3rd resubmittals, respectively. Submittal 25B, for example, is the second resubmittal of submittal 25.

B. DEVIATION FROM CONTRACT:

If the Contractor proposes to provide material, equipment, or method of work that deviates from the project manual, he or she must so indicate under "deviations" on the transmittal form accompanying the submittal copies.

C. SUBMITTAL COMPLETENESS:

Submittals which do not have all the information required to be submitted, including deviations, are not acceptable and will be returned without review.

5.0 REVIEW PROCEDURE
A. GENERAL:

Submittals are specified for those features and characteristics of materials, equipment, and methods of operation which can be selected based on the Contractor's judgment of their conformance to the specified requirements. Other features and characteristics are specified in a manner that enables the Contractor to determine acceptable options without submittals. The review procedure is based on the Contractor's guarantee that all features and characteristics not requiring submittals conform as specified. Review will not extend to means, methods, techniques, sequences or procedures of construction, or to verifying quantities, dimensions, weights or gages, or fabrication processes (except where specifically indicated or required by the project manual) or to safety precautions or programs incident thereto. Review of a separate item, as such, will not indicate approval of the assembly in which the item functions.

When the contract documents require a submittal, the Contractor shall submit the specified information as follows:

1. Three (3) copies of all submitted information plus one reproducible original of all information must be transmitted with submittals for review and LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
4 of 5 01 33 00 – SUBMITTALS
comment. The reproducible original must be submitted in a three ring binder with spine identification, cover identification, and table of contents and index tabs to identify the various items. Contractor is also advised to submit these documents in electronic (pdf) format, to expedite Engineer’s approval process.

2. Unless otherwise specified, 4 copies of all submitted information must be transmitted with submittals (Product Data) for information only.

B. SUBMITTALS FOR REVIEW AND COMMENT:

Unless otherwise specified, within 30 calendar days after receipt of a submittal for review and comment, the Construction Manager shall review the submittal and return 2 copies of the marked-up reproducible original noted in 1 above. The reproducible original will be retained by the Construction Manager. The returned submittal will indicate one of the following actions:

1. If the review indicates that the material, equipment or work method complies with the project manual, submittal copies will be marked "NO EXCEPTIONS TAKEN." In this event, the Contractor may begin to implement the work method or incorporate the material or equipment covered by the submittal.

2. If the review indicates limited corrections are required, copies will be marked "MAKE CORRECTIONS NOTED." The Contractor may begin
implementing the work method or incorporating the material and equipment covered by the submittal in accordance with the noted corrections.

3. If the review reveals that the submittal is insufficient or contains incorrect data, copies will be marked "AMEND AND RESUBMIT." Except at his own risk, the Contractor may not undertake work covered by this submittal until it has been revised, resubmitted and returned marked either "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED."

4. If the review indicates that the material, equipment, or work method does not comply with the project manual, copies of the submittal will be marked "REJECTED - SEE REMARKS." Submittals with deviations that have not been identified clearly may be rejected. Except at his own risk, the Contractor may not undertake the work covered by such submittals until a new submittal is made and returned marked either "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED."
C. SUBMITTALS (PRODUCT DATA) FOR INFORMATION ONLY:

Such information is not subject to submittal review procedures and will be provided as part of the work under this contract and its acceptability determined under normal inspection procedures.

6.0 EFFECT OF REVIEW OF CONTRACTOR'S SUBMITTALS
Review of contract drawings, methods of work, or information regarding materials or equipment the Contractor proposes to provide, will not relieve the Contractor of his or her responsibility for errors therein and may not be regarded as an assumption of risks or liability by the LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 33 00 - SUBMITTALS 5 of 5
Construction Manager or the Owner, or by any officer or employee thereof, and the Contractor will have no claim under the contract on account of the failure, or partial failure, of the method of work, material, or equipment so reviewed. A mark of "NO EXCEPTIONS TAKEN" or "MAKE CORRECTIONS NOTED" means that the Owner has no objection to the Contractor, upon his own responsibility, using the plan or method of work proposed, or providing the materials or equipment proposed.

7.0 SUBMITTAL SCHEDULE
 03 – Concrete Mix Design for Structural Concrete
 04 – Cedar Decking
 09 – Paint – Samples for color approval

END OF SECTION
LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 41 00 – REGULATORY REQUIREMENTS 1 of 2
SECTION 01 41 00

REGULATORY REQUIREMENTS
PART 1--GENERAL

1.01 PERMITS
A. Contractor shall secure all other permits or licenses required to complete the project and any that may be required to construct the project, including, but not limited to the following:

1. Post at the work site copies of Construction Safety Orders and General Safety Orders issued by the California State Division of Industrial Safety.

2. Any permits required by the appropriate Air Quality Management District for demolition work. For information concerning permits contact North Coast Unified Air Quality Management District (AQMD), Permit/Application Receiving at (707) 443-3093.

3. Any permits required by the appropriate Air Quality Management District to operate construction equipment. For information concerning permits contact North Coast Unified Air Quality Management District (AQMD), Permit/Application Receiving at (707) 443-3093.

B. Contractor shall be responsible for payment of any additional costs or fines due to re-inspection and approval of the work or other related problems deemed necessary by an agency inspector.

C. Contractor shall conform to all requirements stated in these permits and shall make all necessary corrections to the installation that may be directed by agency engineers and inspectors. Once a permit has been acquired, the Contractor shall review the conditions of the permit and assess if they are consistent with the executed Contract. If not, Contractor shall within 10 working days provide notice in writing of changed items not originally included in the Contractor’s Bid or subsequent contract.

1.02 FIRE SAFETY
A. Contractor is to be especially careful in all welding and cutting operations to avoid fire.

B. Onsite inspection shall be required for all hot work. Prior to starting hot work notify the Owner and any adjacent tenants of the property within 100 feet of the hot work location, 48 hours prior to the work.

C. Furnish all safety devices, extinguishers, and fire watch personnel, as necessary to protect the public, the work and the Owner.

1.03 TRAFFIC CONTROL
LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
2 of 2 01 41 00 – REGULATORY REQUIREMENTS
Provide all traffic control signs, barricades, and warning devices necessary to control traffic from all directions. Land traffic shall be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) as required in Section 01 55 26 of these Specifications; and water traffic shall be in accordance with the requirements of the U.S. Coast Guard. Traffic control plans shall be submitted within 15 days of the pre-construction meeting.

1.04 SHEETING, SHORING, & BRACING
Pursuant to Labor Code Section 6705, the excavation of any trench or trenches five feet or more in depth requires the submission by the Contractor and acceptance by the Owner or by a registered civil or structural engineer, employed by the Owner, to whom authority to accept has been delegated, in advance of excavation, of a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

Nothing in this clause shall be deemed to allow the use of a shoring, sloping, or protective system less effective than that required by the Construction Safety Orders.

PART 2--NOT USED
PART 3--EXECUTION

3.01 EQUIPMENT (NOT USED)

END OF SECTION
LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 45 00 – QUALITY CONTROL 1 of 7
SECTION 01 45 00

QUALITY CONTROL
PART 1--GENERAL

1.01 DESCRIPTION
This section specifies administrative and procedural requirements for quality control services, field inspections, and field testing of civil and structural constructs required for this project. Contractor is responsible for the quality assurance and quality control of their respective work.

1.02 DEFINITIONS
Quality Control System (QCS): The quality control, assurance, and inspection system established and carried out to ensure compliance with the Plans and Specifications.

QCS Supervisor: That person in responsible charge of the work occurring, as designated by the Contractor in the QCS Plan.

QCS Inspector: Responsible, certified personnel inspecting the various constructs at specified milestones and during the project overall and designated by the Construction Manager. The Special Inspector is part of the QCS Inspector team.

Factory Test: Tests made on various materials, products and component parts prior to shipment to the job site.

Field Tests: Tests and analyses made at or in the vicinity of the job site in connection with the actual construction.

Certified Inspection Report: Reports signed by approved inspectors attesting that the items inspected meet the specification requirements other than any exceptions included in the report
Certificate of Compliance: Certificate from the manufacturer of the material or equipment identifying said manufacturer, product and referenced standard, and shall be signed by a designated officer of the manufacturer.

Standard Compliance: Condition whereby specified materials or equipment must conform to the standards of organizations such as the American National Standard Institute (ANSI), American Society for Testing and Materials (ASTM), Underwriters Laboratories (UL) or similar organization.

Quality Assurance: The day-to-day, in-process supervisory observations of work and materials conducted by the Contractor to assure that the proper methods and materials are being used and installed by tradesmen.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
2 of 7 01 45 00 – QUALITY CONTROL
Source Quality Control: The in-process testing and inspections conducted by the QCS Inspector(s) to verify that the materials, equipment, workmanship and shop manufactured constructs are in compliance with the Contract Documents, applicable Codes and standards.

Field Quality Control: The testing and inspections conducted by the QCS Inspector(s) in the field during and at the completion of each construct to verify that the in-process and completed construction is in compliance with the Contract Documents, applicable Codes and standards.

Energy Star Inspector/Certifier: Designated and paid for by the Owner.

Building Official/Building Inspector: As defined by the IBC and California Code of Regulations Title 24. This project is within the jurisdiction of the Crescent City Building Department. The Owner has retained the services of the Project Designers to perform that role on this project.

1.03 REFERENCES
This section contains references to the following documents. They are a part of this section as specified and modified. Where a referenced document contains references to other standards, those documents are included as references under this section as if referenced directly. In the event of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.

Unless otherwise specified, references to documents shall mean the documents in effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the Agreement if there were no Bids). If referenced documents have been discontinued by the issuing organization, references to those documents shall mean the replacement documents issued or otherwise identified by that organization, or if there are no replacement documents, the last version of the document before it was discontinued. Where document dates are given in the following listing, references to those documents shall mean the specific document version associated with that date, regardless of whether the document has been superseded by a version with a later date, discontinued, or replaced.

Reference Title
ASTM C102 Practice for Laboratories Engaged in the Testing of Building Sealants.

ASTM C802 Practice for Conducting an Inter-Laboratory Test Program to Determine the Precision of Test Methods for Construction.

ASTM D3740 Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.

ASTM D4561 Practice for Quality Control Systems for an Inspection and testing Agency for Bituminous Paving Materials.

ASTM E329 Practice for Use in the Evaluation of Inspection and Testing Agencies as Used in Construction.

IBC 2016 California Building Code

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 45 00 – QUALITY CONTROL 3 of 7

1.04 CONTRACTOR’S RESPONSIBILITIES
Contractor’s responsibilities shall be as follows:

1. Monitor quality assurance over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.

2. Coordinate with, schedule specified inspections by, and provide normal and customary assistance to the QCS Inspectors.

3. Comply fully with manufacturers’ instructions, including each step in sequence.

4. Should manufacturers’ instructions conflict with Contract Documents, request clarification from Construction Manager before proceeding.

5. Comply with specified standards as a minimum quality for the work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

6. Perform work by persons qualified to produce workmanship of specified quality.

7. Notify Building Inspector with 48-hour notice to observe all construction elements related to the project, regardless of trade, prior to covering. No work elements shall be covered prior to written acceptance by the Building Inspector. If so, the work shall be exposed and recovered by and at the sole expense of the Contractor.

8. To demonstrate compliance with the contract requirements, the Contractor must assist the Construction Manager in his performance of inspection work. The Contractor must grant the Construction Manager access to the work and to the site of the work, and to the places where work is being prepared, or whence materials, equipment or machinery are being obtained for the work. The Contractor must provide information requested by the Construction Manager in connection with inspection work.

9. If the Contract Documents, laws, ordinances, or any public regulatory authority require parts of the work to be specially inspected, tested or approved, the Contractor will give the Construction Manager adequate prior written notice of the availability of the subject work for examination.

10. If parts of the work are covered in contravention of the Construction Manager's directive, the cost of exposing the work for inspection and closing must be borne by the Contractor regardless of whether or not the work is found to be in compliance with the contract.

11. If any work is covered in the absence of the Construction Manager's directive to the contrary, the Contractor must, if directed to do so by the Construction Manager, uncover, expose or otherwise make available for LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
4 of 7 01 45 00 – QUALITY CONTROL
inspection, portions of covered work. If it is found that such work is defective, the Contractor must bear the expense of uncovering and reconstructing. If the work is found to be in compliance with the contract, the Contractor will be allowed an increase in the contract price, or an extension in the contract time, or both. A change order will be issued to document the increase, extension or both.

1.05 REGULATORY REQUIREMENTS
A. GENERAL:

Comply with all Federal, State, and local codes as referenced herein. Such regulations apply to activities including, but not limited to, sitework and zoning, building practices and quality, on and offsite disposal, safety, sanitation, nuisance, and environmental quality.

B. SPECIAL INSPECTION:

Special Inspection shall be performed by the Special Inspector under contract with the Construction Manager in conformance with the IBC. Special Inspection is in addition to, but not replacing, other inspections and quality control requirements herein. Where sampling and testing required herein conforms to Special Inspection standards, such sampling and testing need not be duplicated.

C. STRUCTURAL OBSERVATION:

Engineer shall make visual inspections of the work to assess general conformance with the Contract Documents at significant construction stages and at completion of the structural system. The QCS shall include a preliminary set of Structural Observations and what items are expected to be observed. Contractor shall request this preliminary set from Engineer through Construction Manager and submit as part of their QCS submittal.

The following structural milestones shall be considered significant construction stages:
(NONE)

1.06 FIELD SAMPLE PROCEDURES
When field samples are specified in a unit of work, construct each field sample to include work of all trades required to complete the field sample prior to starting related field work. Field samples may be incorporated into the project after acceptance by Construction Manager.

Remove unacceptable field samples when directed by Construction Manager. Acceptable samples represent a quality level for the work.

1.07 MANUFACTURERS’ FIELD SERVICES AND REPORTS
When specified in individual specification sections, product suppliers or manufacturers shall provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance of equipment as applicable, and to provide instructions when necessary. Contractor shall submit qualifications of observer to Construction Manager 30 days in advance of required observations.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 45 00 – QUALITY CONTROL 5 of 7
QCS Inspector shall record observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers’ written instructions.

1.08 JOB SITE CONDITIONS
Schedule to ensure all preparatory work has been accomplished prior to proceeding with current work. Proceeding with the work constitutes acceptance of conditions. Allow adequate time for materials susceptible to temperature and humidity to “stabilize” prior to installation.

1.09 SUBMITTALS
A. The following information shall be provided in accordance with Section 01 33 00:

1. A copy of this specification section, with addendum updates included, and all referenced and applicable sections, with addendum updates included, with each paragraph check-marked to indicate specification compliance or marked to indicate requested deviations from specification requirements. Check marks () shall denote full compliance with a paragraph as a whole. If deviations from the specifications are indicated, and therefore requested by the Contractor, each deviation shall be underlined and denoted by a number in the margin to the right of the identified paragraph, referenced to a detailed written explanation of the reasons for requesting the deviation. The Construction Manager shall be the final authority for determining acceptability of requested deviations.

The remaining portions of the paragraph not underlined will signify compliance on the part of the Contractor with the specifications. Failure to include a copy of the marked-up specification sections, along with justification(s) for any requested deviations to the specification requirements, with the submittal shall be sufficient cause for rejection of the entire submittal with no further consideration.

2. Written description of Contractor’s proposed QCS plan in sufficient detail to illustrate understanding and approach. The QCS plan and submittal shall include a log showing anticipated inspections, Special Inspections, and source and field Quality Assurance procedures. Preliminary submittal of the QCS plan may be made prior to commencing field work.

The preliminary submittal will illustrate the project’s initial three (3) month’s work and be followed one month later by a final QCS plan submittal.

3. Contractor’s proposed QCS Supervisor, qualifications, and if requested, references.

4. Preliminary structural observation set as described in paragraph 1.05 C.

5. Complete structural system information describing Contractor designed structural systems, including sealed calculations, shop and erection drawings, product literature for the various components, ICBO Evaluation Reports for structural components, and a discussion of risk issues associated with the proposed system which could adversely impact overall project completion.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
6 of 7 01 45 00 – QUALITY CONTROL

6. If requested by the Construction Manager during the work, manufacturer’s field services and reports. If not so requested, treat same as Product Data.

PART 2--PRODUCTS

2.01 SOURCE QUALITY CONTROL
A. CONTRACTOR RESPONSIBILITIES:

Provide source quality control according to the reviewed and accepted QCS plan and paragraph 1.04 herein. Coordinate with Construction Manager to facilitate the work of the Testing Laboratory specified in Section 01 45 29 and Special Inspector. Provide ready access to sampling and inspection locations and incidental labor customary in such sampling and inspections. Timely prepare and submit submittals and revise as indicated by review comments. Comply with technical requirements in each specification Section that applies to the work.

B. CONSTRUCTION MANAGER RESPONSIBILITIES:

Review Contractor’s tracking of QCS activities at monthly meetings. Facilitate completion of submittal review per Section 01 33 00. Assist Contractor to ensure that Special Inspection occurs where and when specified.

C. ACCEPTANCE CRITERIA:

Acceptable characteristics and quality of a particular item or construct is defined in that item’s or construct’s specification Section.

2.02 PRODUCT DATA
A. The following product data shall be provided in accordance with Section 01 33 00:

1. Manufacturers’ field services and reports unless requested by Construction Manager to be submitted for review.

2. Special Inspection reports, unless otherwise directed in each technical specification section.

PART 3--EXECUTION

3.01 FIELD QUALITY CONTROL
A. Field quality control responsibilities of the Contractor and Construction Manager are substantially the same as described in paragraph 2.01, with the exception that this work occurs primarily on the jobsite as the work progresses, and Special Inspection will occur more often than at the source.

B. Acceptable characteristics and quality of a particular item or construct is defined in that item’s or construct’s specification section.

LIGHTHOUSE COVE – CABIN PROJECT AUGUST 1, 2026
01 45 00 – QUALITY CONTROL 7 of 7

3.02 REGULATORY COMPLIANCE – SPECIAL INSPECTIONS
A. The following types of work require Special Inspection according to Chapter 17 of the IBC and each system’s specification section:

1. Structure fill.

2. Structural concrete and reinforcing.

3. Anchor bolts and post-installed anchor systems.

4. Structural steel and aluminum including connections.

B. Section 01 45 29 describes Testing Laboratory sampling, testing and reporting, much of which conforms to Special Inspection requirements, and need not be replicated.

C. Contractor designed structural systems are subject to the same Special Inspection requirements as all other work.

3.03 CORRECTION OF DEFECTIVE WORK
Remove and replace defective, rejected, and condemned work at Contractor’s expense until such work meets the requirements of Contract Documents. Costs for Inspection of corrected work shall be paid by the Contractor.

END OF SECTION

CITY COUNCIL AGENDA REPORT
TO: MAYOR WRIGHT AND MEMBERS OF THE CITY COUNCIL
FROM: ERIC WIER, CITY MANAGER
BY: BRIDGET LACEY, GRANTS AND ECONOMIC DEVELOPMENT

MANAGER
DATE: SEPTEMBER 8, 2026
SUBJECT: CALTRANS SUSTAINABLE TRANSPORTATION PLANNING GRANT ______________________________________________________________________

RECOMMENDATION
• Hear staff report
• Technical questions from the Council
• Receive public comment
• Further Council discussion
• Direct staff to prepare an application for California Department of Transportation funding through the Sustainable Transportation Planning Grant Program for the Redwood Highway Multi-modal Transportation & Land Use Plan (MTLUP) in the amount of up to $600,000 on behalf of the Del Norte Local Transportation Commission.
• Approve a letter to the California Department of Transportation endorsing the Redwood Highway Multi-modal Transportation & Land Use Plan (MTLUP) project.

BACKGROUND
The Sustainable Transportation Planning Grant Program was created to support the California Department of Transportation’s (Caltrans) Mission: Improving lives and communities through transportation.

The California Legislature passed, and Governor Edmund G. Brown Jr. signed into law, Senate Bill 1 (SB 1, Beall, Chapter 5, Statutes of 2017) – The Road Repair and accountability Act of 2017, a transportation funding bill that provides a reliable fund source to maintain and integrate the State’s multimodal transportation system. In addition to the $10 million in traditional State and federal grants, approximately $25 million in SB 1 funds for Sustainable Communities Grants is available for each grant cycle.

SUSTAINABLE TRANSPORTATION PLANNING GRANT APPLICATION
SEPTEMBER 8, 2026
2 The State-funded Sustainable Communities grants ($30.4 million) are intended to support and implement Regional Transportation Plan (RTP) Sustainable Communities Strategies/Alternative Planning Strategies (SCS/APS) (where applicable) and to ultimately achieve the State’s greenhouse gas (GHG) reduction target of 40 and 80 percent below 1990 levels by 2030 and 2050, respectively.

The federal-funded Strategic Partnerships and Strategic Partnership Transit grants ($4.5 million) support Federal Planning Factors and address State highway/transit issues of regional, interregional, and/or statewide significance, in partnership with Caltrans.

Eligible planning projects must have a transportation nexus per Article XIX Sections 2 and 3 of the California Constitution. Therefore, successful planning projects are expected to directly benefit the multimodal transportation system. These grants will also improve public health, social equity, environmental justice, the environment, and provide other important community benefits. The period of grant fund availability spans over three fiscal years and approximately 32 months for grant project activities after the grant agreement is executed and Caltrans issues a Notice to Proceed.

On November 17, 2025, Council directed staff to prepare an application under the fiscal year (FY) 2026-27 Sustainable Transportation Planning Grant Call for Applications under the Sustainable Communities Grants sub-category for the Redwood Highway Multi-modal Transportation & Land Use Plan project in the amount of $443,353, however, the City was not selected for award.

On August 18, 2026, Caltrans released the fiscal year (FY) 2027-28 Sustainable Transportation Planning Grant Call for Applications.

ITEM ANALYSIS
City staff met with Caltrans staff in late July to get feedback on the FY26-27 application and was strongly encouraged to resubmit with the next Call for Applications (FY27-28).

It was also determined that the City’s project may be a better fit under the Strategic Partnerships program, rather than the Sustainable Communities program. Applicants under this category must be either a Metropolitan Planning Organization (MPO) or Regional Transportation Planning Agency (RTPA), which means that the Del Norte Local Transportation Commission would need to be the applicant, rather than the City.

On August 25, 2026, City staff took a request for the Del Norte Local Transportation Commission (LTC) to, both, (1) provide the grant match (up to $120,000) and (2) serve as the applicant and lead agency for the FY27-28 Strategic Partnerships grant application to the LTC Technical Advisory Committee (TAC). The request was approved by the committee and on September 1, 2026 the Del Norte Local Transportation Commission unanimously directed staff to proceed with the application and agendize the approval of the match funding on their October 6th meeting

SUSTAINABLE TRANSPORTATION PLANNING GRANT APPLICATION
SEPTEMBER 8, 2026
3 With LTC as the applicant and lead agency, City staff will still manage the project from start to finish as an extension of the Downtown Specific Plan.

Currently, the Highway 101 corridor through downtown is not an integrated land use and transportation corridor. While this reach of Highway 101 adequately addresses throughtraffic and vehicle mobility, it is not a complete street because it does not integrate adjacent existing or potential land uses, nor does it include adequate facilities for walking, biking and transit modes. With the City's Downtown Specific Plan currently underway, it has become apparent that a critical piece to ensuring a more successful downtown will be to capture some of the traffic from Highway 101 and guide these visitors to the downtown corridor. City staff sees the Sustainable Transportation Grant as a great opportunity to further study and plan for the following elements along Highway 101 from Northcrest to the southern boundary of the City:
• Safety and accessibility for all users
• Multi-modal transportation options
• Link to downtown and harbor districts
• Traffic calming (i.e. narrowing of lanes or "road diet") • Improvements to aesthetics (i.e. landscaping reflective of the City's connection to its natural resources)
With this funding, the City can plan for a more pedestrian and bike friendly Highway 101 corridor with wider sidewalks, protected bike lanes, comfortable transit shelters, and seamless connectivity to the downtown and harbor districts. The estimated timeline is as follows:

Submit application October 9, 2026
Award announcements Spring 2027
Contract execution Spring 2027
Project begins Summer 2027
Grant expenditure deadline June 2030
.

FISCAL ANALYSIS
This grant requires a 20% match which the Del Norte Local Transportation Commission unanimously directed staff to agendize in there October meeting in an amount not to exceed $120,000. With the anticipated DNLTC approval of this match, there is no fiscal impact to the City, aside from the staff time involved in writing the grant and managing the project.

SUSTAINABLE TRANSPORTATION PLANNING GRANT APPLICATION
SEPTEMBER 8, 2026
4 STRATEGIC PLAN ASSESSMENT
This action supports the following Strategic Plan goals:
• Goal 1: Support quality services, community safety, and health to enhance the quality of life and experience of our residents and visitors • Goal 1(A): Enhance collaboration with other agencies and the community to better aid the public
• Goal 1(E): Target economic development improvements that provide additional benefit by enhancing the quality of life for residents • Goal 2(D): Collaborate with other jurisdictions and nonprofits to maximize regional effectiveness and amplify funding opportunities • Goal 2(E): Create an environment that is conducive to attracting and retaining strong, sustainable businesses that reflect community needs and culture
• Goal 2(F)(9): Expand on the success of grant funding by maximizing utilization of opportunities with corresponding community needs

ATTACHMENTS

1. Draft Letter of Support
September 9, 2026
Del Norte Local Transportation Commission
Attn: Executive Director and Commissioners
900 Northcrest Drive, PMB 16
Crescent City, CA 95531
RE: Letter of Support – Redwood Highway Multi-modal Transportation and Land Use Plan
Dear Ms. Leighton,
On behalf of the City of Crescent City, I am pleased to express our strong support for the Del Norte Local Transportation Commission's application for funding to develop the Redwood Highway Multimodal Transportation and Land Use Plan.

The Redwood Highway (U.S. 101) is one of the most important transportation and economic corridors in Crescent City and Del Norte County. In addition to serving as a primary regional transportation route, Highway 101 provides access to local businesses, neighborhoods, employment centers, visitor destinations, and community services. As a gateway to the Redwood Coast, the corridor also plays an important role in introducing visitors to Crescent City and the surrounding region.

The proposed plan will provide an important opportunity to evaluate the corridor comprehensively and identify improvements that better accommodate walking, bicycling, transit, automobiles, and other modes of transportation. The plan will also examine how transportation investments can support appropriate land uses, encourage economic development, improve safety and connectivity, and create a more attractive and functional gateway into the community.

This effort is particularly important because the existing corridor is heavily automobileoriented and has limited facilities for pedestrians, bicyclists, and transit users. A coordinated multimodal and land use planning process will help the City establish a longterm vision for the corridor while identifying practical projects and strategies that can be implemented over time.

We also appreciate the Del Norte Local Transportation Commission's intent to coordinate closely with the City, as well as Caltrans, Del Norte County, Redwood Coast Regional Transit Authority, local businesses, property owners, community organizations, and other stakeholders. This collaborative approach will help ensure that the resulting plan reflects the needs of the community while being consistent with regional and state transportation objectives.

The Redwood Highway corridor represents a significant opportunity to strengthen Crescent City’s economy, improve mobility and safety, support tourism, and enhance the overall quality of life for residents and visitors. The development of a comprehensive multimodal transportation and land use plan is an important first step toward realizing that opportunity.

For these reasons, the City of Crescent City strongly supports the Del Norte Local Transportation Commission’s application for funding for the Redwood Highway Multimodal Transportation and Land Use Plan. We encourage the California Department of Transportation's Sustainable Transportation Planning Grant Program to support this important planning effort.

Thank you for your consideration.
.

Sincerely,
Isaiah Wright
Mayor
City of Crescent City

CITY COUNCIL AGENDA REPORT
TO: MAYOR WRIGHT AND MEMBERS OF THE CITY COUNCIL
FROM: ERIC WIER, CITY MANAGER
BY: DAVE YEAGER, DIRECTOR OF PUBLIC WORKS

JAMES QUEEN, ENGINEERING PROJECT MANAGER

BRIDGET LACEY, GRANTS AND ECONOMIC DEVELOPMENT

MANAGER
DATE: SEPTEMBER 8, 2026
SUBJECT: NORTHCREST CORRIDOR PLAN – CALTRANS TRANSPORTATION

PLANNING GRANT APPLICATION IN PARTNERSHIP WITH DEL

NORTE COUNTY AND DEL NORTE LOCAL TRANSPORTATION

COMMISSION
______________________________________________________________________

RECOMMENDATION
• Hear staff report
• Technical questions from the Council
• Receive public comment
• Further Council discussion
• Approve a letter in support of the Northcrest Corridor Planning project for the Del Norte Local Transportation Commission's grant application for funding under the California Department of Transportation Sustainable Transportation Planning Grant Program.

BACKGROUND
The Sustainable Transportation Planning Grant Program was created to support the California Department of Transportation’s (Caltrans) Mission: Improving lives and communities through transportation.

The California Legislature passed, and Governor Edmund G. Brown Jr. signed into law, Senate Bill 1 (SB 1, Beall, Chapter 5, Statutes of 2017) – The Road Repair and accountability Act of 2017, a transportation funding bill that provides a reliable fund source to maintain and integrate the State’s multimodal transportation system. In addition to the $10 million in traditional State and federal grants, approximately $25 million in SB 1 funds for Sustainable Communities Grants is available for each grant cycle.

SUPPORT FOR NORTHCREST CORRIDOR PLANNING GRANT
September 8, 2026
2 The State-funded Sustainable Communities grants ($30.4 million) are intended to support and implement Regional Transportation Plan (RTP) Sustainable Communities Strategies/Alternative Planning Strategies (SCS/APS) (where applicable) and to ultimately achieve the State’s greenhouse gas (GHG) reduction target of 40 and 80 percent below 1990 levels by 2030 and 2050, respectively.

The federal-funded Strategic Partnerships and Strategic Partnership Transit grants ($4.5 million) support Federal Planning Factors and address State highway/transit issues of regional, interregional, and/or statewide significance, in partnership with Caltrans.

Eligible planning projects must have a transportation nexus per Article XIX Sections 2 and 3 of the California Constitution. Therefore, successful planning projects are expected to directly benefit the multimodal transportation system. These grants will also improve public health, social equity, environmental justice, the environment, and provide other important community benefits. The period of grant fund availability spans over three fiscal years and approximately 32 months for grant project activities after the grant agreement is executed and Caltrans issues a Notice to Proceed.

On August 18, 2026, Caltrans released the FY 2027-28 Sustainable Transportation Planning Grant Call for Applications.

ANALYSIS
The Del Norte Local Transportation Commission has identified the Northcrest Corridor Project as a priority project for the region. The proposed project consists of pedestrian and bicycle improvements for Northcrest Drive from U.S. 101 to Blackwell Lane.

Improvements to this corridor would include designing ADA improvements where the current walkways are out of compliance. The need for Northcrest corridor improvements is also supported by injury-fatality rate statistics. Improving pedestrian and bicycle routes would benefit both the City and County communities.

Northcrest Drive is the busiest roadway through the City not including the state highway.

The City has jurisdiction of Northcrest Drive from Highway 101 to Harding Avenue. The properties on the west side of Northcrest from Harding to Washington Boulevard are also included in the City. Northcrest Drive itself is the responsibility of the County from the north side of Harding to Blackwell Avenue.

This corridor analysis will provide elements of design and justification for future grants and publicly funded street improvement projects. These improvements will benefit the pedestrians and bicyclists utilizing the corridor, but it will also benefit the businesses in the area. Access will be improved to social service providers, local retail centers, schools down Harding and Washington, as well as a charter school with access on Northcrest Drive. There are also many residential areas which are located adjacent to this length of Northcrest that will benefit from the improvements.

SUPPORT FOR NORTHCREST CORRIDOR PLANNING GRANT
September 8, 2026
3 The City and County have jointly requested that the Del Norte Local Transportation Commission (DNLTC) apply for funding through the Sustainable Transportation Planning Grant Program for the Northcrest Corridor Plan. On August 18, 2026, DNLTC approved a contract for grant writing services with Dokken Engineering and on September 1, 2026 DNLTC approved the contribution of the matching funds required for this application.

While DNLTC is funding the consultant to help write the application, supporting information and review will need to be provided by both City and County staff. DNLTC has also requested that each benefiting agency provide a letter of support for the application.

FINANCIAL IMPACT
Approval of the letter of support does not have a direct financial impact on the City. The Del Norte Local Transportation Commission is using DNLTC funds for the grant application and for matching grant funds. Some City staff time will be required to provide information for the grant application.

The City will benefit from the results of the successful Northcrest Corridor Planning project as it will be an available resource for future improvements within the City.

STRATEGIC PLAN ASSESSMENT
This report is consistent with the following 2016 Strategic Plan Goals:

GOAL 1: SUPPORT QUALITY SERVICES, COMMUNITY SAFETY, AND HEALTH TO

ENHANCE THE QUALITY OF LIFE AND EXPERIENCE OF OUR RESIDENTS AND

VISITORS
D. Provide and maintain an efficient, adequate infrastructure to provide for both current and future community needs
F. Incorporate health considerations into decision-making across departments and policy areas by:
• Examining methods to maintain, enhance, and expand park and recreation facilities
GOAL 2: PROMOTE A THRIVING LOCAL ECONOMY
F. Plan and prepare for the growth and future needs of the Crescent City community by:
• Expanding on the success of grant funding by maximizing utilization of opportunities with corresponding community needs

ATTACHMENTS

1. Northcrest Corridor Plan Letter of support.

September 08, 2026
Del Norte Local Transportation Commission
Attn: Executive Director and Commissioners
900 Northcrest Drive, PMB 16
Crescent City, CA 95531
RE: Letter of Support for the DNLTC Caltrans Planning Grant – Northcrest Corridor Plan
Dear Ms. Leighton,
I am writing on behalf of the City of Crescent City to express our strong support for the Northcrest Corridor Plan and for the Del Norte Local Transportation Commission’s (DNLTC) application for funding under the FY 27-28 Caltrans Sustainable Transportation Planning Grant Program. This funding is critical to improving safety and expanding multimodal transportation options along the Northcrest Drive corridor.

Of particular concern is the corridor’s history of injuries and fatalities, especially along the section between Washington Boulevard and the nearby school. These conditions demonstrate the need for a comprehensive and forward-looking approach to improving safety and accessibility. The City is committed to working with DNLTC, Del Norte County, local schools, and other community partners to identify improvements that will make Northcrest Drive safer and more accessible for people of all ages and abilities.

Improving Northcrest Drive will provide benefits beyond transportation. A safer, more connected corridor can encourage walking and bicycling, improve access to schools and community destinations, provide greater mobility for residents who do not drive, and support the City’s broader goals for sustainability, economic vitality, and quality of life.

Thank you for submitting the Northcrest Corridor Plan grant application. Funding from this grant would allow Crescent City and Del Norte County to develop a safer, more efficient multimodal corridor that promotes greater use of carbon-free transportation along our most heavily traveled local roadway.

Sincerely,
Isaiah Wright
Mayor, City of Crescent City