Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 680,000 9,247.86 10,879.83 9,710.25 11,423.82 10,172.64 11,967.81 10,635.03 12,511.80 88.40 190.40 28.00 681,000 9,259.82 10,893.90 9,722.81 11,438.60 10,185.80 11,983.29 10,648.79 12,527.99 88.53 190.68 28.00 682,000 9,271.77 10,907.97 9,735.36 11,453.37 10,198.95 11,998.77 10,662.54 12,544.17 88.66 190.96 28.00 683,000 9,283.73 10,922.04 9,747.92 11,468.14 10,212.11 12,014.24 10,676.29 12,560.35 88.79 191.24 28.00 684,000 9,295.69 10,936.11 9,760.48 11,482.92 10,225.26 12,029.72 10,690.05 12,576.53 88.92 191.52 28.00 685,000 9,307.65 10,950.18 9,773.04 11,497.69 10,238.42 12,045.20 10,703.80 12,592.71 89.05 191.80 28.00 686,000 9,319.61 10,964.25 9,785.59 11,512.46 10,251.57 12,060.68 10,717.55 12,608.89 89.18 192.08 28.00 687,000 9,331.57 10,978.32 9,798.15 11,527.24 10,264.73 12,076.15 10,731.31 12,625.07 89.31 192.36 28.00 688,000 9,343.53 10,992.39 9,810.71 11,542.01 10,277.88 12,091.63 10,745.06 12,641.25 89.44 192.64 28.00 689,000 9,355.49 11,006.46 9,823.27 11,556.78 10,291.04 12,107.11 10,758.81 12,657.43 89.57 192.92 28.00 690,000 9,367.45 11,020.53 9,835.82 11,571.56 10,304.20 12,122.58 10,772.57 12,673.61 89.70 193.20 28.00 691,000 9,379.41 11,034.60 9,848.38 11,586.33 10,317.35 12,138.06 10,786.32 12,689.79 89.83 193.48 28.00 692,000 9,391.37 11,048.67 9,860.94 11,601.10 10,330.51 12,153.54 10,800.07 12,705.97 89.96 193.76 28.00 693,000 9,403.33 11,062.74 9,873.50 11,615.88 10,343.66 12,169.01 10,813.83 12,722.15 90.09 194.04 28.00 694,000 9,415.29 11,076.81 9,886.05 11,630.65 10,356.82 12,184.49 10,827.58 12,738.33 90.22 194.32 28.00 695,000 9,427.25 11,090.88 9,898.61 11,645.42 10,369.97 12,199.97 10,841.34 12,754.51 90.35 194.60 28.00 696,000 9,439.21 11,104.95 9,911.17 11,660.20 10,383.13 12,215.45 10,855.09 12,770.69 90.48 194.88 28.00 697,000 9,451.17 11,119.02 9,923.73 11,674.97 10,396.28 12,230.92 10,868.84 12,786.87 90.61 195.16 28.00 698,000 9,463.13 11,133.09 9,936.28 11,689.74 10,409.44 12,246.40 10,882.60 12,803.05 90.74 195.44 28.00 699,000 9,475.09 11,147.16 9,948.84 11,704.52 10,422.59 12,261.88 10,896.35 12,819.23 90.87 195.72 28.00 700,000 9,487.05 11,161.23 9,961.40 11,719.29 10,435.75 12,277.35 10,910.10 12,835.41 91.00 196.00 28.00 701,000 9,499.01 11,175.30 9,973.96 11,734.07 10,448.91 12,292.83 10,923.86 12,851.60 91.13 196.28 29.00 702,000 9,510.96 11,189.37 9,986.51 11,748.84 10,462.06 12,308.31 10,937.61 12,867.78 91.26 196.56 29.00 703,000 9,522.92 11,203.44 9,999.07 11,763.61 10,475.22 12,323.78 10,951.36 12,883.96 91.39 196.84 29.00 704,000 9,534.88 11,217.51 10,011.63 11,778.39 10,488.37 12,339.26 10,965.12 12,900.14 91.52 197.12 29.00 705,000 9,546.84 11,231.58 10,024.19 11,793.16 10,501.53 12,354.74 10,978.87 12,916.32 91.65 197.40 29.00 706,000 9,558.80 11,245.65 10,036.74 11,807.93 10,514.68 12,370.22 10,992.62 12,932.50 91.78 197.68 29.00 707,000 9,570.76 11,259.72 10,049.30 11,822.71 10,527.84 12,385.69 11,006.38 12,948.68 91.91 197.96 29.00 708,000 9,582.72 11,273.79 10,061.86 11,837.48 10,540.99 12,401.17 11,020.13 12,964.86 92.04 198.24 29.00 709,000 9,594.68 11,287.86 10,074.42 11,852.25 10,554.15 12,416.65 11,033.88 12,981.04 92.17 198.52 29.00 710,000 9,606.64 11,301.93 10,086.97 11,867.03 10,567.30 12,432.12 11,047.64 12,997.22 92.30 198.80 29.00 711,000 9,618.60 11,316.00 10,099.53 11,881.80 10,580.46 12,447.60 11,061.39 13,013.40 92.43 199.08 29.00 712,000 9,630.56 11,330.07 10,112.09 11,896.57 10,593.62 12,463.08 11,075.14 13,029.58 92.56 199.36 29.00 713,000 9,642.52 11,344.14 10,124.64 11,911.35 10,606.77 12,478.55 11,088.90 13,045.76 92.69 199.64 29.00 714,000 9,654.48 11,358.21 10,137.20 11,926.12 10,619.93 12,494.03 11,102.65 13,061.94 92.82 199.92 29.00 715,000 9,666.44 11,372.28 10,149.76 11,940.89 10,633.08 12,509.51 11,116.40 13,078.12 92.95 200.20 29.00 716,000 9,678.40 11,386.35 10,162.32 11,955.67 10,646.24 12,524.99 11,130.16 13,094.30 93.08 200.48 29.00 717,000 9,690.36 11,400.42 10,174.87 11,970.44 10,659.39 12,540.46 11,143.91 13,110.48 93.21 200.76 29.00 718,000 9,702.32 11,414.49 10,187.43 11,985.21 10,672.55 12,555.94 11,157.66 13,126.66 93.34 201.04 29.00 719,000 9,714.28 11,428.56 10,199.99 11,999.99 10,685.70 12,571.42 11,171.42 13,142.84 93.47 201.32 29.00 50
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 720,000 9,726.24 11,442.63 10,212.55 12,014.76 10,698.86 12,586.89 11,185.17 13,159.02 93.60 201.60 29.00 721,000 9,738.20 11,456.70 10,225.10 12,029.54 10,712.01 12,602.37 11,198.92 13,175.21 93.73 201.88 29.00 722,000 9,750.15 11,470.77 10,237.66 12,044.31 10,725.17 12,617.85 11,212.68 13,191.39 93.86 202.16 29.00 723,000 9,762.11 11,484.84 10,250.22 12,059.08 10,738.33 12,633.32 11,226.43 13,207.57 93.99 202.44 29.00 724,000 9,774.07 11,498.91 10,262.78 12,073.86 10,751.48 12,648.80 11,240.18 13,223.75 94.12 202.72 29.00 725,000 9,786.03 11,512.98 10,275.33 12,088.63 10,764.64 12,664.28 11,253.94 13,239.93 94.25 203.00 29.00 726,000 9,797.99 11,527.05 10,287.89 12,103.40 10,777.79 12,679.76 11,267.69 13,256.11 94.38 203.28 30.00 727,000 9,809.95 11,541.12 10,300.45 12,118.18 10,790.95 12,695.23 11,281.44 13,272.29 94.51 203.56 30.00 728,000 9,821.91 11,555.19 10,313.01 12,132.95 10,804.10 12,710.71 11,295.20 13,288.47 94.64 203.84 30.00 729,000 9,833.87 11,569.26 10,325.56 12,147.72 10,817.26 12,726.19 11,308.95 13,304.65 94.77 204.12 30.00 730,000 9,845.83 11,583.33 10,338.12 12,162.50 10,830.41 12,741.66 11,322.71 13,320.83 94.90 204.40 30.00 731,000 9,857.79 11,597.40 10,350.68 12,177.27 10,843.57 12,757.14 11,336.46 13,337.01 95.03 204.68 30.00 732,000 9,869.75 11,611.47 10,363.24 12,192.04 10,856.72 12,772.62 11,350.21 13,353.19 95.16 204.96 30.00 733,000 9,881.71 11,625.54 10,375.79 12,206.82 10,869.88 12,788.09 11,363.97 13,369.37 95.29 205.24 30.00 734,000 9,893.67 11,639.61 10,388.35 12,221.59 10,883.04 12,803.57 11,377.72 13,385.55 95.42 205.52 30.00 735,000 9,905.63 11,653.68 10,400.91 12,236.36 10,896.19 12,819.05 11,391.47 13,401.73 95.55 205.80 30.00 736,000 9,917.59 11,667.75 10,413.47 12,251.14 10,909.35 12,834.53 11,405.23 13,417.91 95.68 206.08 30.00 737,000 9,929.55 11,681.82 10,426.02 12,265.91 10,922.50 12,850.00 11,418.98 13,434.09 95.81 206.36 30.00 738,000 9,941.51 11,695.89 10,438.58 12,280.68 10,935.66 12,865.48 11,432.73 13,450.27 95.94 206.64 30.00 739,000 9,953.47 11,709.96 10,451.14 12,295.46 10,948.81 12,880.96 11,446.49 13,466.45 96.07 206.92 30.00 740,000 9,965.43 11,724.03 10,463.70 12,310.23 10,961.97 12,896.43 11,460.24 13,482.63 96.20 207.20 30.00 741,000 9,977.39 11,738.10 10,476.25 12,325.01 10,975.12 12,911.91 11,473.99 13,498.82 96.33 207.48 30.00 742,000 9,989.34 11,752.17 10,488.81 12,339.78 10,988.28 12,927.39 11,487.75 13,515.00 96.46 207.76 30.00 743,000 10,001.30 11,766.24 10,501.37 12,354.55 11,001.43 12,942.86 11,501.50 13,531.18 96.59 208.04 30.00 744,000 10,013.26 11,780.31 10,513.93 12,369.33 11,014.59 12,958.34 11,515.25 13,547.36 96.72 208.32 30.00 745,000 10,025.22 11,794.38 10,526.48 12,384.10 11,027.75 12,973.82 11,529.01 13,563.54 96.85 208.60 30.00 746,000 10,037.18 11,808.45 10,539.04 12,398.87 11,040.90 12,989.30 11,542.76 13,579.72 96.98 208.88 30.00 747,000 10,049.14 11,822.52 10,551.60 12,413.65 11,054.06 13,004.77 11,556.51 13,595.90 97.11 209.16 30.00 748,000 10,061.10 11,836.59 10,564.16 12,428.42 11,067.21 13,020.25 11,570.27 13,612.08 97.24 209.44 30.00 749,000 10,073.06 11,850.66 10,576.71 12,443.19 11,080.37 13,035.73 11,584.02 13,628.26 97.37 209.72 30.00 750,000 10,085.02 11,864.73 10,589.27 12,457.97 11,093.52 13,051.20 11,597.77 13,644.44 97.50 210.00 30.00 751,000 10,096.98 11,878.80 10,601.83 12,472.74 11,106.68 13,066.68 11,611.53 13,660.62 97.63 210.28 31.00 752,000 10,108.94 11,892.87 10,614.39 12,487.51 11,119.83 13,082.16 11,625.28 13,676.80 97.76 210.56 31.00 753,000 10,120.90 11,906.94 10,626.94 12,502.29 11,132.99 13,097.63 11,639.03 13,692.98 97.89 210.84 31.00 754,000 10,132.86 11,921.01 10,639.50 12,517.06 11,146.14 13,113.11 11,652.79 13,709.16 98.02 211.12 31.00 755,000 10,144.82 11,935.08 10,652.06 12,531.83 11,159.30 13,128.59 11,666.54 13,725.34 98.15 211.40 31.00 756,000 10,156.78 11,949.15 10,664.62 12,546.61 11,172.46 13,144.07 11,680.29 13,741.52 98.28 211.68 31.00 757,000 10,168.74 11,963.22 10,677.17 12,561.38 11,185.61 13,159.54 11,694.05 13,757.70 98.41 211.96 31.00 758,000 10,180.70 11,977.29 10,689.73 12,576.15 11,198.77 13,175.02 11,707.80 13,773.88 98.54 212.24 31.00 759,000 10,192.66 11,991.36 10,702.29 12,590.93 11,211.92 13,190.50 11,721.55 13,790.06 98.67 212.52 31.00 51
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 760,000 10,204.62 12,005.43 10,714.85 12,605.70 11,225.08 13,205.97 11,735.31 13,806.24 98.80 212.80 31.00 761,000 10,216.58 12,019.50 10,727.40 12,620.48 11,238.23 13,221.45 11,749.06 13,822.43 98.93 213.08 31.00 762,000 10,228.53 12,033.57 10,739.96 12,635.25 11,251.39 13,236.93 11,762.81 13,838.61 99.06 213.36 31.00 763,000 10,240.49 12,047.64 10,752.52 12,650.02 11,264.54 13,252.40 11,776.57 13,854.79 99.19 213.64 31.00 764,000 10,252.45 12,061.71 10,765.08 12,664.80 11,277.70 13,267.88 11,790.32 13,870.97 99.32 213.92 31.00 765,000 10,264.41 12,075.78 10,777.63 12,679.57 11,290.85 13,283.36 11,804.07 13,887.15 99.45 214.20 31.00 766,000 10,276.37 12,089.85 10,790.19 12,694.34 11,304.01 13,298.84 11,817.83 13,903.33 99.58 214.48 31.00 767,000 10,288.33 12,103.92 10,802.75 12,709.12 11,317.17 13,314.31 11,831.58 13,919.51 99.71 214.76 31.00 768,000 10,300.29 12,117.99 10,815.31 12,723.89 11,330.32 13,329.79 11,845.34 13,935.69 99.84 215.04 31.00 769,000 10,312.25 12,132.06 10,827.86 12,738.66 11,343.48 13,345.27 11,859.09 13,951.87 99.97 215.32 31.00 770,000 10,324.21 12,146.13 10,840.42 12,753.44 11,356.63 13,360.74 11,872.84 13,968.05 100.10 215.60 31.00 771,000 10,336.17 12,160.20 10,852.98 12,768.21 11,369.79 13,376.22 11,886.60 13,984.23 100.23 215.88 31.00 772,000 10,348.13 12,174.27 10,865.54 12,782.98 11,382.94 13,391.70 11,900.35 14,000.41 100.36 216.16 31.00 773,000 10,360.09 12,188.34 10,878.09 12,797.76 11,396.10 13,407.17 11,914.10 14,016.59 100.49 216.44 31.00 774,000 10,372.05 12,202.41 10,890.65 12,812.53 11,409.25 13,422.65 11,927.86 14,032.77 100.62 216.72 31.00 775,000 10,384.01 12,216.48 10,903.21 12,827.30 11,422.41 13,438.13 11,941.61 14,048.95 100.75 217.00 31.00 776,000 10,395.97 12,230.55 10,915.77 12,842.08 11,435.56 13,453.61 11,955.36 14,065.13 100.88 217.28 32.00 777,000 10,407.93 12,244.62 10,928.32 12,856.85 11,448.72 13,469.08 11,969.12 14,081.31 101.01 217.56 32.00 778,000 10,419.89 12,258.69 10,940.88 12,871.62 11,461.88 13,484.56 11,982.87 14,097.49 101.14 217.84 32.00 779,000 10,431.85 12,272.76 10,953.44 12,886.40 11,475.03 13,500.04 11,996.62 14,113.67 101.27 218.12 32.00 780,000 10,443.81 12,286.83 10,966.00 12,901.17 11,488.19 13,515.51 12,010.38 14,129.85 101.40 218.40 32.00 781,000 10,455.77 12,300.90 10,978.55 12,915.95 11,501.34 13,530.99 12,024.13 14,146.04 101.53 218.68 32.00 782,000 10,467.72 12,314.97 10,991.11 12,930.72 11,514.50 13,546.47 12,037.88 14,162.22 101.66 218.96 32.00 783,000 10,479.68 12,329.04 11,003.67 12,945.49 11,527.65 13,561.94 12,051.64 14,178.40 101.79 219.24 32.00 784,000 10,491.64 12,343.11 11,016.23 12,960.27 11,540.81 13,577.42 12,065.39 14,194.58 101.92 219.52 32.00 785,000 10,503.60 12,357.18 11,028.78 12,975.04 11,553.96 13,592.90 12,079.14 14,210.76 102.05 219.80 32.00 786,000 10,515.56 12,371.25 11,041.34 12,989.81 11,567.12 13,608.38 12,092.90 14,226.94 102.18 220.08 32.00 787,000 10,527.52 12,385.32 11,053.90 13,004.59 11,580.27 13,623.85 12,106.65 14,243.12 102.31 220.36 32.00 788,000 10,539.48 12,399.39 11,066.46 13,019.36 11,593.43 13,639.33 12,120.40 14,259.30 102.44 220.64 32.00 789,000 10,551.44 12,413.46 11,079.01 13,034.13 11,606.59 13,654.81 12,134.16 14,275.48 102.57 220.92 32.00 790,000 10,563.40 12,427.53 11,091.57 13,048.91 11,619.74 13,670.28 12,147.91 14,291.66 102.70 221.20 32.00 791,000 10,575.36 12,441.60 11,104.13 13,063.68 11,632.90 13,685.76 12,161.66 14,307.84 102.83 221.48 32.00 792,000 10,587.32 12,455.67 11,116.69 13,078.45 11,646.05 13,701.24 12,175.42 14,324.02 102.96 221.76 32.00 793,000 10,599.28 12,469.74 11,129.24 13,093.23 11,659.21 13,716.71 12,189.17 14,340.20 103.09 222.04 32.00 794,000 10,611.24 12,483.81 11,141.80 13,108.00 11,672.36 13,732.19 12,202.92 14,356.38 103.22 222.32 32.00 795,000 10,623.20 12,497.88 11,154.36 13,122.77 11,685.52 13,747.67 12,216.68 14,372.56 103.35 222.60 32.00 796,000 10,635.16 12,511.95 11,166.92 13,137.55 11,698.67 13,763.15 12,230.43 14,388.74 103.48 222.88 32.00 797,000 10,647.12 12,526.02 11,179.47 13,152.32 11,711.83 13,778.62 12,244.18 14,404.92 103.61 223.16 32.00 798,000 10,659.08 12,540.09 11,192.03 13,167.09 11,724.98 13,794.10 12,257.94 14,421.10 103.74 223.44 32.00 799,000 10,671.04 12,554.16 11,204.59 13,181.87 11,738.14 13,809.58 12,271.69 14,437.28 103.87 223.72 32.00 52
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 800,000 10,683.00 12,568.23 11,217.15 13,196.64 11,751.30 13,825.05 12,285.44 14,453.46 104.00 224.00 32.00 801,000 10,694.96 12,582.30 11,229.70 13,211.42 11,764.45 13,840.53 12,299.20 14,469.65 104.13 224.28 33.00 802,000 10,706.91 12,596.37 11,242.26 13,226.19 11,777.61 13,856.01 12,312.95 14,485.83 104.26 224.56 33.00 803,000 10,718.87 12,610.44 11,254.82 13,240.96 11,790.76 13,871.48 12,326.71 14,502.01 104.39 224.84 33.00 804,000 10,730.83 12,624.51 11,267.38 13,255.74 11,803.92 13,886.96 12,340.46 14,518.19 104.52 225.12 33.00 805,000 10,742.79 12,638.58 11,279.93 13,270.51 11,817.07 13,902.44 12,354.21 14,534.37 104.65 225.40 33.00 806,000 10,754.75 12,652.65 11,292.49 13,285.28 11,830.23 13,917.92 12,367.97 14,550.55 104.78 225.68 33.00 807,000 10,766.71 12,666.72 11,305.05 13,300.06 11,843.38 13,933.39 12,381.72 14,566.73 104.91 225.96 33.00 808,000 10,778.67 12,680.79 11,317.61 13,314.83 11,856.54 13,948.87 12,395.47 14,582.91 105.04 226.24 33.00 809,000 10,790.63 12,694.86 11,330.16 13,329.60 11,869.69 13,964.35 12,409.23 14,599.09 105.17 226.52 33.00 810,000 10,802.59 12,708.93 11,342.72 13,344.38 11,882.85 13,979.82 12,422.98 14,615.27 105.30 226.80 33.00 811,000 10,814.55 12,723.00 11,355.28 13,359.15 11,896.01 13,995.30 12,436.73 14,631.45 105.43 227.08 33.00 812,000 10,826.51 12,737.07 11,367.83 13,373.92 11,909.16 14,010.78 12,450.49 14,647.63 105.56 227.36 33.00 813,000 10,838.47 12,751.14 11,380.39 13,388.70 11,922.32 14,026.25 12,464.24 14,663.81 105.69 227.64 33.00 814,000 10,850.43 12,765.21 11,392.95 13,403.47 11,935.47 14,041.73 12,477.99 14,679.99 105.82 227.92 33.00 815,000 10,862.39 12,779.28 11,405.51 13,418.24 11,948.63 14,057.21 12,491.75 14,696.17 105.95 228.20 33.00 816,000 10,874.35 12,793.35 11,418.06 13,433.02 11,961.78 14,072.69 12,505.50 14,712.35 106.08 228.48 33.00 817,000 10,886.31 12,807.42 11,430.62 13,447.79 11,974.94 14,088.16 12,519.25 14,728.53 106.21 228.76 33.00 818,000 10,898.27 12,821.49 11,443.18 13,462.56 11,988.09 14,103.64 12,533.01 14,744.71 106.34 229.04 33.00 819,000 10,910.23 12,835.56 11,455.74 13,477.34 12,001.25 14,119.12 12,546.76 14,760.89 106.47 229.32 33.00 820,000 10,922.19 12,849.63 11,468.29 13,492.11 12,014.40 14,134.59 12,560.51 14,777.07 106.60 229.60 33.00 821,000 10,934.15 12,863.70 11,480.85 13,506.89 12,027.56 14,150.07 12,574.27 14,793.26 106.73 229.88 33.00 822,000 10,946.10 12,877.77 11,493.41 13,521.66 12,040.71 14,165.55 12,588.02 14,809.44 106.86 230.16 33.00 823,000 10,958.06 12,891.84 11,505.97 13,536.43 12,053.87 14,181.02 12,601.77 14,825.62 106.99 230.44 33.00 824,000 10,970.02 12,905.91 11,518.52 13,551.21 12,067.03 14,196.50 12,615.53 14,841.80 107.12 230.72 33.00 825,000 10,981.98 12,919.98 11,531.08 13,565.98 12,080.18 14,211.98 12,629.28 14,857.98 107.25 231.00 33.00 826,000 10,993.94 12,934.05 11,543.64 13,580.75 12,093.34 14,227.46 12,643.03 14,874.16 107.38 231.28 34.00 827,000 11,005.90 12,948.12 11,556.20 13,595.53 12,106.49 14,242.93 12,656.79 14,890.34 107.51 231.56 34.00 828,000 11,017.86 12,962.19 11,568.75 13,610.30 12,119.65 14,258.41 12,670.54 14,906.52 107.64 231.84 34.00 829,000 11,029.82 12,976.26 11,581.31 13,625.07 12,132.80 14,273.89 12,684.29 14,922.70 107.77 232.12 34.00 830,000 11,041.78 12,990.33 11,593.87 13,639.85 12,145.96 14,289.36 12,698.05 14,938.88 107.90 232.40 34.00 831,000 11,053.74 13,004.40 11,606.43 13,654.62 12,159.11 14,304.84 12,711.80 14,955.06 108.03 232.68 34.00 832,000 11,065.70 13,018.47 11,618.98 13,669.39 12,172.27 14,320.32 12,725.55 14,971.24 108.16 232.96 34.00 833,000 11,077.66 13,032.54 11,631.54 13,684.17 12,185.42 14,335.79 12,739.31 14,987.42 108.29 233.24 34.00 834,000 11,089.62 13,046.61 11,644.10 13,698.94 12,198.58 14,351.27 12,753.06 15,003.60 108.42 233.52 34.00 835,000 11,101.58 13,060.68 11,656.66 13,713.71 12,211.74 14,366.75 12,766.81 15,019.78 108.55 233.80 34.00 836,000 11,113.54 13,074.75 11,669.21 13,728.49 12,224.89 14,382.23 12,780.57 15,035.96 108.68 234.08 34.00 837,000 11,125.50 13,088.82 11,681.77 13,743.26 12,238.05 14,397.70 12,794.32 15,052.14 108.81 234.36 34.00 838,000 11,137.46 13,102.89 11,694.33 13,758.03 12,251.20 14,413.18 12,808.07 15,068.32 108.94 234.64 34.00 839,000 11,149.42 13,116.96 11,706.89 13,772.81 12,264.36 14,428.66 12,821.83 15,084.50 109.07 234.92 34.00 53
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 840,000 11,161.38 13,131.03 11,719.44 13,787.58 12,277.51 14,444.13 12,835.58 15,100.68 109.20 235.20 34.00 841,000 11,173.34 13,145.10 11,732.00 13,802.36 12,290.67 14,459.61 12,849.34 15,116.87 109.33 235.48 34.00 842,000 11,185.29 13,159.17 11,744.56 13,817.13 12,303.82 14,475.09 12,863.09 15,133.05 109.46 235.76 34.00 843,000 11,197.25 13,173.24 11,757.12 13,831.90 12,316.98 14,490.56 12,876.84 15,149.23 109.59 236.04 34.00 844,000 11,209.21 13,187.31 11,769.67 13,846.68 12,330.13 14,506.04 12,890.60 15,165.41 109.72 236.32 34.00 845,000 11,221.17 13,201.38 11,782.23 13,861.45 12,343.29 14,521.52 12,904.35 15,181.59 109.85 236.60 34.00 846,000 11,233.13 13,215.45 11,794.79 13,876.22 12,356.45 14,537.00 12,918.10 15,197.77 109.98 236.88 34.00 847,000 11,245.09 13,229.52 11,807.35 13,891.00 12,369.60 14,552.47 12,931.86 15,213.95 110.11 237.16 34.00 848,000 11,257.05 13,243.59 11,819.90 13,905.77 12,382.76 14,567.95 12,945.61 15,230.13 110.24 237.44 34.00 849,000 11,269.01 13,257.66 11,832.46 13,920.54 12,395.91 14,583.43 12,959.36 15,246.31 110.37 237.72 34.00 850,000 11,280.97 13,271.73 11,845.02 13,935.32 12,409.07 14,598.90 12,973.12 15,262.49 110.50 238.00 34.00 851,000 11,292.93 13,285.80 11,857.58 13,950.09 12,422.22 14,614.38 12,986.87 15,278.67 110.63 238.28 35.00 852,000 11,304.89 13,299.87 11,870.13 13,964.86 12,435.38 14,629.86 13,000.62 15,294.85 110.76 238.56 35.00 853,000 11,316.85 13,313.94 11,882.69 13,979.64 12,448.53 14,645.33 13,014.38 15,311.03 110.89 238.84 35.00 854,000 11,328.81 13,328.01 11,895.25 13,994.41 12,461.69 14,660.81 13,028.13 15,327.21 111.02 239.12 35.00 855,000 11,340.77 13,342.08 11,907.81 14,009.18 12,474.84 14,676.29 13,041.88 15,343.39 111.15 239.40 35.00 856,000 11,352.73 13,356.15 11,920.36 14,023.96 12,488.00 14,691.77 13,055.64 15,359.57 111.28 239.68 35.00 857,000 11,364.69 13,370.22 11,932.92 14,038.73 12,501.16 14,707.24 13,069.39 15,375.75 111.41 239.96 35.00 858,000 11,376.65 13,384.29 11,945.48 14,053.50 12,514.31 14,722.72 13,083.14 15,391.93 111.54 240.24 35.00 859,000 11,388.61 13,398.36 11,958.04 14,068.28 12,527.47 14,738.20 13,096.90 15,408.11 111.67 240.52 35.00 860,000 11,400.57 13,412.43 11,970.59 14,083.05 12,540.62 14,753.67 13,110.65 15,424.29 111.80 240.80 35.00 861,000 11,412.53 13,426.50 11,983.15 14,097.83 12,553.78 14,769.15 13,124.40 15,440.48 111.93 241.08 35.00 862,000 11,424.48 13,440.57 11,995.71 14,112.60 12,566.93 14,784.63 13,138.16 15,456.66 112.06 241.36 35.00 863,000 11,436.44 13,454.64 12,008.27 14,127.37 12,580.09 14,800.10 13,151.91 15,472.84 112.19 241.64 35.00 864,000 11,448.40 13,468.71 12,020.82 14,142.15 12,593.24 14,815.58 13,165.66 15,489.02 112.32 241.92 35.00 865,000 11,460.36 13,482.78 12,033.38 14,156.92 12,606.40 14,831.06 13,179.42 15,505.20 112.45 242.20 35.00 866,000 11,472.32 13,496.85 12,045.94 14,171.69 12,619.55 14,846.54 13,193.17 15,521.38 112.58 242.48 35.00 867,000 11,484.28 13,510.92 12,058.50 14,186.47 12,632.71 14,862.01 13,206.92 15,537.56 112.71 242.76 35.00 868,000 11,496.24 13,524.99 12,071.05 14,201.24 12,645.87 14,877.49 13,220.68 15,553.74 112.84 243.04 35.00 869,000 11,508.20 13,539.06 12,083.61 14,216.01 12,659.02 14,892.97 13,234.43 15,569.92 112.97 243.32 35.00 870,000 11,520.16 13,553.13 12,096.17 14,230.79 12,672.18 14,908.44 13,248.18 15,586.10 113.10 243.60 35.00 871,000 11,532.12 13,567.20 12,108.73 14,245.56 12,685.33 14,923.92 13,261.94 15,602.28 113.23 243.88 35.00 872,000 11,544.08 13,581.27 12,121.28 14,260.33 12,698.49 14,939.40 13,275.69 15,618.46 113.36 244.16 35.00 873,000 11,556.04 13,595.34 12,133.84 14,275.11 12,711.64 14,954.87 13,289.44 15,634.64 113.49 244.44 35.00 874,000 11,568.00 13,609.41 12,146.40 14,289.88 12,724.80 14,970.35 13,303.20 15,650.82 113.62 244.72 35.00 875,000 11,579.96 13,623.48 12,158.96 14,304.65 12,737.95 14,985.83 13,316.95 15,667.00 113.75 245.00 35.00 876,000 11,591.92 13,637.55 12,171.51 14,319.43 12,751.11 15,001.31 13,330.71 15,683.18 113.88 245.28 36.00 877,000 11,603.88 13,651.62 12,184.07 14,334.20 12,764.26 15,016.78 13,344.46 15,699.36 114.01 245.56 36.00 878,000 11,615.84 13,665.69 12,196.63 14,348.97 12,777.42 15,032.26 13,358.21 15,715.54 114.14 245.84 36.00 879,000 11,627.80 13,679.76 12,209.19 14,363.75 12,790.58 15,047.74 13,371.97 15,731.72 114.27 246.12 36.00 54
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 880,000 11,639.76 13,693.83 12,221.74 14,378.52 12,803.73 15,063.21 13,385.72 15,747.90 114.40 246.40 36.00 881,000 11,651.72 13,707.90 12,234.30 14,393.30 12,816.89 15,078.69 13,399.47 15,764.09 114.53 246.68 36.00 882,000 11,663.67 13,721.97 12,246.86 14,408.07 12,830.04 15,094.17 13,413.23 15,780.27 114.66 246.96 36.00 883,000 11,675.63 13,736.04 12,259.42 14,422.84 12,843.20 15,109.64 13,426.98 15,796.45 114.79 247.24 36.00 884,000 11,687.59 13,750.11 12,271.97 14,437.62 12,856.35 15,125.12 13,440.73 15,812.63 114.92 247.52 36.00 885,000 11,699.55 13,764.18 12,284.53 14,452.39 12,869.51 15,140.60 13,454.49 15,828.81 115.05 247.80 36.00 886,000 11,711.51 13,778.25 12,297.09 14,467.16 12,882.66 15,156.08 13,468.24 15,844.99 115.18 248.08 36.00 887,000 11,723.47 13,792.32 12,309.65 14,481.94 12,895.82 15,171.55 13,481.99 15,861.17 115.31 248.36 36.00 888,000 11,735.43 13,806.39 12,322.20 14,496.71 12,908.97 15,187.03 13,495.75 15,877.35 115.44 248.64 36.00 889,000 11,747.39 13,820.46 12,334.76 14,511.48 12,922.13 15,202.51 13,509.50 15,893.53 115.57 248.92 36.00 890,000 11,759.35 13,834.53 12,347.32 14,526.26 12,935.29 15,217.98 13,523.25 15,909.71 115.70 249.20 36.00 891,000 11,771.31 13,848.60 12,359.88 14,541.03 12,948.44 15,233.46 13,537.01 15,925.89 115.83 249.48 36.00 892,000 11,783.27 13,862.67 12,372.43 14,555.80 12,961.60 15,248.94 13,550.76 15,942.07 115.96 249.76 36.00 893,000 11,795.23 13,876.74 12,384.99 14,570.58 12,974.75 15,264.41 13,564.51 15,958.25 116.09 250.04 36.00 894,000 11,807.19 13,890.81 12,397.55 14,585.35 12,987.91 15,279.89 13,578.27 15,974.43 116.22 250.32 36.00 895,000 11,819.15 13,904.88 12,410.11 14,600.12 13,001.06 15,295.37 13,592.02 15,990.61 116.35 250.60 36.00 896,000 11,831.11 13,918.95 12,422.66 14,614.90 13,014.22 15,310.85 13,605.77 16,006.79 116.48 250.88 36.00 897,000 11,843.07 13,933.02 12,435.22 14,629.67 13,027.37 15,326.32 13,619.53 16,022.97 116.61 251.16 36.00 898,000 11,855.03 13,947.09 12,447.78 14,644.44 13,040.53 15,341.80 13,633.28 16,039.15 116.74 251.44 36.00 899,000 11,866.99 13,961.16 12,460.34 14,659.22 13,053.68 15,357.28 13,647.03 16,055.33 116.87 251.72 36.00 900,000 11,878.95 13,975.23 12,472.89 14,673.99 13,066.84 15,372.75 13,660.79 16,071.51 117.00 252.00 36.00 901,000 11,890.91 13,989.30 12,485.45 14,688.77 13,080.00 15,388.23 13,674.54 16,087.70 117.13 252.28 37.00 902,000 11,902.86 14,003.37 12,498.01 14,703.54 13,093.15 15,403.71 13,688.29 16,103.88 117.26 252.56 37.00 903,000 11,914.82 14,017.44 12,510.57 14,718.31 13,106.31 15,419.18 13,702.05 16,120.06 117.39 252.84 37.00 904,000 11,926.78 14,031.51 12,523.12 14,733.09 13,119.46 15,434.66 13,715.80 16,136.24 117.52 253.12 37.00 905,000 11,938.74 14,045.58 12,535.68 14,747.86 13,132.62 15,450.14 13,729.55 16,152.42 117.65 253.40 37.00 906,000 11,950.70 14,059.65 12,548.24 14,762.63 13,145.77 15,465.62 13,743.31 16,168.60 117.78 253.68 37.00 907,000 11,962.66 14,073.72 12,560.80 14,777.41 13,158.93 15,481.09 13,757.06 16,184.78 117.91 253.96 37.00 908,000 11,974.62 14,087.79 12,573.35 14,792.18 13,172.08 15,496.57 13,770.81 16,200.96 118.04 254.24 37.00 909,000 11,986.58 14,101.86 12,585.91 14,806.95 13,185.24 15,512.05 13,784.57 16,217.14 118.17 254.52 37.00 910,000 11,998.54 14,115.93 12,598.47 14,821.73 13,198.39 15,527.52 13,798.32 16,233.32 118.30 254.80 37.00 911,000 12,010.50 14,130.00 12,611.03 14,836.50 13,211.55 15,543.00 13,812.08 16,249.50 118.43 255.08 37.00 912,000 12,022.46 14,144.07 12,623.58 14,851.27 13,224.71 15,558.48 13,825.83 16,265.68 118.56 255.36 37.00 913,000 12,034.42 14,158.14 12,636.14 14,866.05 13,237.86 15,573.95 13,839.58 16,281.86 118.69 255.64 37.00 914,000 12,046.38 14,172.21 12,648.70 14,880.82 13,251.02 15,589.43 13,853.34 16,298.04 118.82 255.92 37.00 915,000 12,058.34 14,186.28 12,661.25 14,895.59 13,264.17 15,604.91 13,867.09 16,314.22 118.95 256.20 37.00 916,000 12,070.30 14,200.35 12,673.81 14,910.37 13,277.33 15,620.39 13,880.84 16,330.40 119.08 256.48 37.00 917,000 12,082.26 14,214.42 12,686.37 14,925.14 13,290.48 15,635.86 13,894.60 16,346.58 119.21 256.76 37.00 918,000 12,094.22 14,228.49 12,698.93 14,939.91 13,303.64 15,651.34 13,908.35 16,362.76 119.34 257.04 37.00 919,000 12,106.18 14,242.56 12,711.48 14,954.69 13,316.79 15,666.82 13,922.10 16,378.94 119.47 257.32 37.00 55
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 920,000 12,118.14 14,256.63 12,724.04 14,969.46 13,329.95 15,682.29 13,935.86 16,395.12 119.60 257.60 37.00 921,000 12,130.10 14,270.70 12,736.60 14,984.24 13,343.10 15,697.77 13,949.61 16,411.31 119.73 257.88 37.00 922,000 12,142.05 14,284.77 12,749.16 14,999.01 13,356.26 15,713.25 13,963.36 16,427.49 119.86 258.16 37.00 923,000 12,154.01 14,298.84 12,761.71 15,013.78 13,369.42 15,728.72 13,977.12 16,443.67 119.99 258.44 37.00 924,000 12,165.97 14,312.91 12,774.27 15,028.56 13,382.57 15,744.20 13,990.87 16,459.85 120.12 258.72 37.00 925,000 12,177.93 14,326.98 12,786.83 15,043.33 13,395.73 15,759.68 14,004.62 16,476.03 120.25 259.00 37.00 926,000 12,189.89 14,341.05 12,799.39 15,058.10 13,408.88 15,775.16 14,018.38 16,492.21 120.38 259.28 38.00 927,000 12,201.85 14,355.12 12,811.94 15,072.88 13,422.04 15,790.63 14,032.13 16,508.39 120.51 259.56 38.00 928,000 12,213.81 14,369.19 12,824.50 15,087.65 13,435.19 15,806.11 14,045.88 16,524.57 120.64 259.84 38.00 929,000 12,225.77 14,383.26 12,837.06 15,102.42 13,448.35 15,821.59 14,059.64 16,540.75 120.77 260.12 38.00 930,000 12,237.73 14,397.33 12,849.62 15,117.20 13,461.50 15,837.06 14,073.39 16,556.93 120.90 260.40 38.00 931,000 12,249.69 14,411.40 12,862.17 15,131.97 13,474.66 15,852.54 14,087.14 16,573.11 121.03 260.68 38.00 932,000 12,261.65 14,425.47 12,874.73 15,146.74 13,487.81 15,868.02 14,100.90 16,589.29 121.16 260.96 38.00 933,000 12,273.61 14,439.54 12,887.29 15,161.52 13,500.97 15,883.49 14,114.65 16,605.47 121.29 261.24 38.00 934,000 12,285.57 14,453.61 12,899.85 15,176.29 13,514.13 15,898.97 14,128.40 16,621.65 121.42 261.52 38.00 935,000 12,297.53 14,467.68 12,912.40 15,191.06 13,527.28 15,914.45 14,142.16 16,637.83 121.55 261.80 38.00 936,000 12,309.49 14,481.75 12,924.96 15,205.84 13,540.44 15,929.93 14,155.91 16,654.01 121.68 262.08 38.00 937,000 12,321.45 14,495.82 12,937.52 15,220.61 13,553.59 15,945.40 14,169.66 16,670.19 121.81 262.36 38.00 938,000 12,333.41 14,509.89 12,950.08 15,235.38 13,566.75 15,960.88 14,183.42 16,686.37 121.94 262.64 38.00 939,000 12,345.37 14,523.96 12,962.63 15,250.16 13,579.90 15,976.36 14,197.17 16,702.55 122.07 262.92 38.00 940,000 12,357.33 14,538.03 12,975.19 15,264.93 13,593.06 15,991.83 14,210.92 16,718.73 122.20 263.20 38.00 941,000 12,369.29 14,552.10 12,987.75 15,279.71 13,606.21 16,007.31 14,224.68 16,734.92 122.33 263.48 38.00 942,000 12,381.24 14,566.17 13,000.31 15,294.48 13,619.37 16,022.79 14,238.43 16,751.10 122.46 263.76 38.00 943,000 12,393.20 14,580.24 13,012.86 15,309.25 13,632.52 16,038.26 14,252.18 16,767.28 122.59 264.04 38.00 944,000 12,405.16 14,594.31 13,025.42 15,324.03 13,645.68 16,053.74 14,265.94 16,783.46 122.72 264.32 38.00 945,000 12,417.12 14,608.38 13,037.98 15,338.80 13,658.84 16,069.22 14,279.69 16,799.64 122.85 264.60 38.00 946,000 12,429.08 14,622.45 13,050.54 15,353.57 13,671.99 16,084.70 14,293.44 16,815.82 122.98 264.88 38.00 947,000 12,441.04 14,636.52 13,063.09 15,368.35 13,685.15 16,100.17 14,307.20 16,832.00 123.11 265.16 38.00 948,000 12,453.00 14,650.59 13,075.65 15,383.12 13,698.30 16,115.65 14,320.95 16,848.18 123.24 265.44 38.00 949,000 12,464.96 14,664.66 13,088.21 15,397.89 13,711.46 16,131.13 14,334.71 16,864.36 123.37 265.72 38.00 950,000 12,476.92 14,678.73 13,100.77 15,412.67 13,724.61 16,146.60 14,348.46 16,880.54 123.50 266.00 38.00 951,000 12,488.88 14,692.80 13,113.32 15,427.44 13,737.77 16,162.08 14,362.21 16,896.72 123.63 266.28 38.00 952,000 12,500.84 14,706.87 13,125.88 15,442.21 13,750.92 16,177.56 14,375.97 16,912.90 123.76 266.56 39.00 953,000 12,512.80 14,720.94 13,138.44 15,456.99 13,764.08 16,193.03 14,389.72 16,929.08 123.89 266.84 39.00 954,000 12,524.76 14,735.01 13,151.00 15,471.76 13,777.23 16,208.51 14,403.47 16,945.26 124.02 267.12 39.00 955,000 12,536.72 14,749.08 13,163.55 15,486.53 13,790.39 16,223.99 14,417.23 16,961.44 124.15 267.40 39.00 956,000 12,548.68 14,763.15 13,176.11 15,501.31 13,803.55 16,239.47 14,430.98 16,977.62 124.28 267.68 39.00 957,000 12,560.64 14,777.22 13,188.67 15,516.08 13,816.70 16,254.94 14,444.73 16,993.80 124.41 267.96 39.00 958,000 12,572.60 14,791.29 13,201.23 15,530.85 13,829.86 16,270.42 14,458.49 17,009.98 124.54 268.24 39.00 959,000 12,584.56 14,805.36 13,213.78 15,545.63 13,843.01 16,285.90 14,472.24 17,026.16 124.67 268.52 39.00 56
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 960,000 12,596.52 14,819.43 13,226.34 15,560.40 13,856.17 16,301.37 14,485.99 17,042.34 124.80 268.80 39.00 961,000 12,608.48 14,833.50 13,238.90 15,575.18 13,869.32 16,316.85 14,499.75 17,058.53 124.93 269.08 39.00 962,000 12,620.43 14,847.57 13,251.46 15,589.95 13,882.48 16,332.33 14,513.50 17,074.71 125.06 269.36 39.00 963,000 12,632.39 14,861.64 13,264.01 15,604.72 13,895.63 16,347.80 14,527.25 17,090.89 125.19 269.64 39.00 964,000 12,644.35 14,875.71 13,276.57 15,619.50 13,908.79 16,363.28 14,541.01 17,107.07 125.32 269.92 39.00 965,000 12,656.31 14,889.78 13,289.13 15,634.27 13,921.94 16,378.76 14,554.76 17,123.25 125.45 270.20 39.00 966,000 12,668.27 14,903.85 13,301.69 15,649.04 13,935.10 16,394.24 14,568.51 17,139.43 125.58 270.48 39.00 967,000 12,680.23 14,917.92 13,314.24 15,663.82 13,948.26 16,409.71 14,582.27 17,155.61 125.71 270.76 39.00 968,000 12,692.19 14,931.99 13,326.80 15,678.59 13,961.41 16,425.19 14,596.02 17,171.79 125.84 271.04 39.00 969,000 12,704.15 14,946.06 13,339.36 15,693.36 13,974.57 16,440.67 14,609.77 17,187.97 125.97 271.32 39.00 970,000 12,716.11 14,960.13 13,351.92 15,708.14 13,987.72 16,456.14 14,623.53 17,204.15 126.10 271.60 39.00 971,000 12,728.07 14,974.20 13,364.47 15,722.91 14,000.88 16,471.62 14,637.28 17,220.33 126.23 271.88 39.00 972,000 12,740.03 14,988.27 13,377.03 15,737.68 14,014.03 16,487.10 14,651.03 17,236.51 126.36 272.16 39.00 973,000 12,751.99 15,002.34 13,389.59 15,752.46 14,027.19 16,502.57 14,664.79 17,252.69 126.49 272.44 39.00 974,000 12,763.95 15,016.41 13,402.15 15,767.23 14,040.34 16,518.05 14,678.54 17,268.87 126.62 272.72 39.00 975,000 12,775.91 15,030.48 13,414.70 15,782.00 14,053.50 16,533.53 14,692.29 17,285.05 126.75 273.00 39.00 976,000 12,787.87 15,044.55 13,427.26 15,796.78 14,066.65 16,549.01 14,706.05 17,301.23 126.88 273.28 40.00 977,000 12,799.83 15,058.62 13,439.82 15,811.55 14,079.81 16,564.48 14,719.80 17,317.41 127.01 273.56 40.00 978,000 12,811.79 15,072.69 13,452.38 15,826.32 14,092.97 16,579.96 14,733.55 17,333.59 127.14 273.84 40.00 979,000 12,823.75 15,086.76 13,464.93 15,841.10 14,106.12 16,595.44 14,747.31 17,349.77 127.27 274.12 40.00 980,000 12,835.71 15,100.83 13,477.49 15,855.87 14,119.28 16,610.91 14,761.06 17,365.95 127.40 274.40 40.00 981,000 12,847.67 15,114.90 13,490.05 15,870.65 14,132.43 16,626.39 14,774.81 17,382.14 127.53 274.68 40.00 982,000 12,859.62 15,128.97 13,502.61 15,885.42 14,145.59 16,641.87 14,788.57 17,398.32 127.66 274.96 40.00 983,000 12,871.58 15,143.04 13,515.16 15,900.19 14,158.74 16,657.34 14,802.32 17,414.50 127.79 275.24 40.00 984,000 12,883.54 15,157.11 13,527.72 15,914.97 14,171.90 16,672.82 14,816.08 17,430.68 127.92 275.52 40.00 985,000 12,895.50 15,171.18 13,540.28 15,929.74 14,185.05 16,688.30 14,829.83 17,446.86 128.05 275.80 40.00 986,000 12,907.46 15,185.25 13,552.84 15,944.51 14,198.21 16,703.78 14,843.58 17,463.04 128.18 276.08 40.00 987,000 12,919.42 15,199.32 13,565.39 15,959.29 14,211.36 16,719.25 14,857.34 17,479.22 128.31 276.36 40.00 988,000 12,931.38 15,213.39 13,577.95 15,974.06 14,224.52 16,734.73 14,871.09 17,495.40 128.44 276.64 40.00 989,000 12,943.34 15,227.46 13,590.51 15,988.83 14,237.68 16,750.21 14,884.84 17,511.58 128.57 276.92 40.00 990,000 12,955.30 15,241.53 13,603.07 16,003.61 14,250.83 16,765.68 14,898.60 17,527.76 128.70 277.20 40.00 991,000 12,967.26 15,255.60 13,615.62 16,018.38 14,263.99 16,781.16 14,912.35 17,543.94 128.83 277.48 40.00 992,000 12,979.22 15,269.67 13,628.18 16,033.15 14,277.14 16,796.64 14,926.10 17,560.12 128.96 277.76 40.00 993,000 12,991.18 15,283.74 13,640.74 16,047.93 14,290.30 16,812.11 14,939.86 17,576.30 129.09 278.04 40.00 994,000 13,003.14 15,297.81 13,653.30 16,062.70 14,303.45 16,827.59 14,953.61 17,592.48 129.22 278.32 40.00 995,000 13,015.10 15,311.88 13,665.85 16,077.47 14,316.61 16,843.07 14,967.36 17,608.66 129.35 278.60 40.00 996,000 13,027.06 15,325.95 13,678.41 16,092.25 14,329.76 16,858.55 14,981.12 17,624.84 129.48 278.88 40.00 997,000 13,039.02 15,340.02 13,690.97 16,107.02 14,342.92 16,874.02 14,994.87 17,641.02 129.61 279.16 40.00 998,000 13,050.98 15,354.09 13,703.53 16,121.79 14,356.07 16,889.50 15,008.62 17,657.20 129.74 279.44 40.00 999,000 13,062.94 15,368.16 13,716.08 16,136.57 14,369.23 16,904.98 15,022.38 17,673.38 129.87 279.72 40.00 57
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 1,000,000 13,074.90 15,382.23 13,728.64 16,151.34 14,382.39 16,920.45 15,036.13 17,689.56 130.00 280.00 40.00 STANDARD FEES: Standard Plan Check fee is equal to 85% of the building permit fee with a minimum standard plan check fee of $172.77. Permit issuance fee is $58.25.Standard Building Permit Formulas:700 - 25,000 valuation- VALUATION (minus) 1000 (divided by) 1000 (times) 23.73 (plus) 92.10 (times) 1.5 25,001 - 50,000 valuation- VALUATION (minus) 25000 (divided by) 1000 (times) 18.23 (plus) 662.94 (times) 1.550,001 - 100,000 valuation- VALUATION (minus) 50000 (divided by) 1000 (times) 13.80 (plus) 1125.93 (times) 1.5100,001 - up valuation- VALUATION (minus) 100000 (divided by) 1000 (times) 9.38 (plus) 1812.82 (times) 1.5 ENERGY FEES: Energy Building Permit fee is equal to 110 % of the standard building permit fee.
Energy Plan Check fee is equal to .9350% of the standard building permit fee.
DISABLE ACCESS: Disable Access Building Permit fee is equal to 105% of the standard building permit fee.
Disable Access Plan Check fee is equal to .8925% of the standard building permit fee.
DISABLE ACCESS Energy and Disable Access Building Permit fee is equal to 115% of the standard building permit fee. & ENERGY: Energy and Disable Access Building Plan Check fee is equal to .9775% of the standard building permit fee.STRONG MOTION: Strong Motion Instrumental Program fee is charged at time of permit issuance:
.013 % of the total valuation of a Group R Occupancy,.028 % of the total valuation of all other occupancies,or $.50, whichever amount is higher.
EXCEPTIONS: 1. A combined swimming pool permit may be issued for a new swimming pool, spa or hot tub which will include all building, electrical, plumbing, heating, and excavation work. The total permit fee for the combined swimming pool permit shall be two times the building permit fee.2. A combined building permit for one-family or two-family dwelling and attached garages(s) shall be 1.6 times the building permit fee. (Section 106.5.6 & Section 107.1) Building Permit Fees are pursuant to the California Building Code, Section 107.1 and the County of Los Angeles Building Code Fee Schedule, Table 1-A.
Building Plan Check Fees are pursuant to the California Building Code, Section 107.2 and the County of Los Angeles Building Code Fee Schedule, Table 1-A. 58
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE
50 604.55 341.66
100 604.55 507.96200 810.15 679.92300 1,015.76 851.88400 1,221.36 1,023.84500 1,426.97 1,195.80600 1,632.57 1,367.76700 1,838.18 1,539.72800 2,043.78 1,711.68900 2,249.39 1,883.64 1,000 2,454.99 2,055.602,000 2,630.90 2,201.403,000 2,801.57 2,345.874,000 2,972.24 2,490.335,000 3,142.91 2,634.806,000 3,313.58 2,779.267,000 3,484.25 2,923.738,000 3,654.92 3,068.19 9,000 3,825.59 3,212.66
10,000 3,996.26 3,357.1211,000 4,095.90 3,447.6812,000 4,196.52 3,539.8813,000 4,297.14 3,632.0914,000 4,397.76 3,724.2915,000 4,498.38 3,816.5016,000 4,599.00 3,908.7017,000 4,699.62 4,000.9118,000 4,800.24 4,093.1119,000 4,900.86 4,185.32 VOLUME
(cu. yds.) NOT OVER
GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
59
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
20,000 5,001.48 4,277.5221,000 5,102.10 4,369.7322,000 5,202.72 4,461.9323,000 5,303.34 4,554.1424,000 5,403.96 4,646.3425,000 5,504.58 4,738.5526,000 5,605.20 4,830.7527,000 5,705.82 4,922.9628,000 5,806.44 5,015.1629,000 5,907.06 5,107.3730,000 6,007.68 5,199.5731,000 6,108.30 5,291.7832,000 6,208.92 5,383.9833,000 6,309.54 5,476.1934,000 6,410.16 5,568.3935,000 6,510.78 5,660.6036,000 6,611.40 5,752.8037,000 6,712.02 5,845.0138,000 6,812.64 5,937.2139,000 6,913.26 6,029.4240,000 7,013.88 6,121.6241,000 7,114.50 6,213.8342,000 7,215.12 6,306.0343,000 7,315.74 6,398.2444,000 7,416.36 6,490.4445,000 7,516.98 6,582.6546,000 7,617.60 6,674.8547,000 7,718.22 6,767.0648,000 7,818.84 6,859.2649,000 7,919.46 6,951.4750,000 8,020.08 7,043.67 60
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
51,000 8,120.70 7,135.8852,000 8,221.32 7,228.0853,000 8,321.94 7,320.2954,000 8,422.56 7,412.4955,000 8,523.18 7,504.7056,000 8,623.80 7,596.9057,000 8,724.42 7,689.1158,000 8,825.04 7,781.3159,000 8,925.66 7,873.5260,000 9,026.28 7,965.7261,000 9,126.90 8,057.9362,000 9,227.52 8,150.1363,000 9,328.14 8,242.3464,000 9,428.76 8,334.5465,000 9,529.38 8,426.7566,000 9,630.00 8,518.9567,000 9,730.62 8,611.1668,000 9,831.24 8,703.3669,000 9,931.86 8,795.5770,000 10,032.48 8,887.7771,000 10,133.10 8,979.9872,000 10,233.72 9,072.1873,000 10,334.34 9,164.3974,000 10,434.96 9,256.5975,000 10,535.58 9,348.8076,000 10,636.20 9,441.0077,000 10,736.82 9,533.2178,000 10,837.44 9,625.4179,000 10,938.06 9,717.6280,000 11,038.68 9,809.8281,000 11,139.30 9,902.03 61
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
82,000 11,239.92 9,994.2383,000 11,340.54 10,086.4484,000 11,441.16 10,178.6485,000 11,541.78 10,270.8586,000 11,642.40 10,363.0587,000 11,743.02 10,455.2688,000 11,843.64 10,547.4689,000 11,944.26 10,639.6790,000 12,044.88 10,731.8791,000 12,145.50 10,824.0892,000 12,246.12 10,916.2893,000 12,346.74 11,008.4994,000 12,447.36 11,100.6995,000 12,547.98 11,192.9096,000 12,648.60 11,285.1097,000 12,749.22 11,377.3198,000 12,849.84 11,469.5199,000 12,950.46 11,561.72 100,000 13,051.08 11,653.92110,000 13,355.90 11,887.82120,000 13,634.31 12,117.53130,000 13,912.73 12,347.24140,000 14,191.14 12,576.95150,000 14,469.56 12,806.66160,000 14,747.97 13,036.37170,000 15,026.39 13,266.08180,000 15,304.80 13,495.79190,000 15,583.22 13,725.50200,000 15,861.63 13,955.21210,000 16,140.05 14,184.92220,000 16,418.46 14,414.63 62
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
230,000 16,696.88 14,644.34240,000 16,975.29 14,874.05250,000 17,253.71 15,103.76260,000 17,532.12 15,333.47270,000 17,810.54 15,563.18280,000 18,088.95 15,792.89290,000 18,367.37 16,022.60300,000 18,645.78 16,252.31310,000 18,924.20 16,482.02320,000 19,202.61 16,711.73330,000 19,481.03 16,941.44340,000 19,759.44 17,171.15350,000 20,037.86 17,400.86360,000 20,316.27 17,630.57370,000 20,594.69 17,860.28380,000 20,873.10 18,089.99390,000 21,151.52 18,319.70400,000 21,429.93 18,549.41410,000 21,708.35 18,779.12420,000 21,986.76 19,008.83430,000 22,265.18 19,238.54440,000 22,543.59 19,468.25450,000 22,822.01 19,697.96460,000 23,100.42 19,927.67470,000 23,378.84 20,157.38480,000 23,657.25 20,387.09490,000 23,935.67 20,616.80500,000 24,214.08 20,846.51510,000 24,462.20 21,076.22520,000 24,714.89 21,305.93530,000 24,967.58 21,535.64 63
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
540,000 25,220.27 21,765.35550,000 25,472.96 21,995.06560,000 25,725.65 22,224.77570,000 25,978.34 22,454.48580,000 26,231.03 22,684.19590,000 26,483.72 22,913.90600,000 26,736.41 23,143.61610,000 26,989.10 23,373.32620,000 27,241.79 23,603.03630,000 27,494.48 23,832.74640,000 27,747.17 24,062.45650,000 27,999.86 24,292.16660,000 28,252.55 24,521.87670,000 28,505.24 24,751.58680,000 28,757.93 24,981.29690,000 29,010.62 25,211.00700,000 29,263.31 25,440.71710,000 29,516.00 25,670.42720,000 29,768.69 25,900.13730,000 30,021.38 26,129.84740,000 30,274.07 26,359.55750,000 30,526.76 26,589.26760,000 30,779.45 26,818.97770,000 31,032.14 27,048.68780,000 31,284.83 27,278.39790,000 31,537.52 27,508.10800,000 31,790.21 27,737.81810,000 32,042.90 27,967.52820,000 32,295.59 28,197.23830,000 32,548.28 28,426.94840,000 32,800.97 28,656.65 64
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
850,000 33,053.66 28,886.36860,000 33,306.35 29,116.07870,000 33,559.04 29,345.78880,000 33,811.73 29,575.49890,000 34,064.42 29,805.20900,000 34,317.11 30,034.91910,000 34,569.80 30,264.62920,000 34,822.49 30,494.33930,000 35,075.18 30,724.04940,000 35,327.87 30,953.75950,000 35,580.56 31,183.46960,000 35,833.25 31,413.17970,000 36,085.94 31,642.88980,000 36,338.63 31,872.59990,000 36,591.32 32,102.30 1,000,000 36,844.01 32,332.01
168.46
(plus) 16,139.67
(times) 1.5
153.14
(plus) 7,772.07
(times) 1.5
PERMIT FEE (Above 1,000,000 Cu Yds):
CUBIC YARDS (subtract) 100,000 (divided by) 10,000 (times) Building Permit Fees are pursuant to the California Building Code, Section 107.1 and the County of Los Angeles Building Code Fee Schedule, Table 1-B.Building Plan Check Fees are pursuant to the California Building Code, Section 107.2 and the County of Los Angeles Building Code Fee Schedule, Table 1-C.
PLAN CHECK FEE (Above 1,000,000 Cu Yds):
CUBIC YARDS (subtract) 500,000 (divided by) 10,000 (times) 65
Engineering
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title Current Fee/Charge Unit Code Full Cost Subsidy % Suggested
Fee Fee Δ
1 Issuance Fee 16.10.020
2 Highway Permit $207.00 16.10.020 NA NA $207.00 $03 Fees for Inspection and Other Costs 16.10.0904 General NA NA $0.00 $0 5 Pre-inspection site visit $168.00 16.10.090 A1 NA NA $168.00 $06 Inspection during non-business hours (up to 4 hours) $636.00 16.10.090 A1 NA NA $636.00 $07 Aditional inspections during non-business hours (over 4 hours) $160.00 16.10.090 A1 NA NA $160.00 $08 Construction Inspection NA NA $0.00 $0 9 Inspect curb drain $216.00 16.10.090 A2 NA NA $216.00 $0 10 Inspect parkway drain $890.00 16.10.090 A2 NA NA $890.00 $011 Inspect residential driveway $742.00 16.10.090 A2 NA NA $742.00 $012 Inspect commercial driveway $907.00 16.10.090 A2 NA NA $907.00 $013 Inspect paving - ≤ 500 SF $1,032.00 16.10.090 A2 NA NA $1,032.00 $014 Inspect paving - > 500 SF Actual Cost 16.10.090 A2 NA NA Actual Cost $015 Inspect sidewalk and curb and gutter16 50 LF or less $570.00 16.10.090 A2 NA NA $570.00 $017 Greater than 50 LF - 250 LF $570 + $2.81/LF over 50 LF 16.10.090 A2 NA NA $570 + $2.81/LF over 50 LF
$0
18 Greater than 250 Lf - 500 LF $1,129 + $1.90/LF over 250 LF 16.10.090 A2 NA NA $1,129 + $1.90/LF over 250 LF
$0
19 Greater than 500 LF Actual Cost 16.10.090 A2 NA NA Actual Cost $020 Inspect new well construction21 Diameter ≤ 8", and depth ≤ 50 ft $479.00 16.10.090 A2 NA NA $479.00 $0 22 Diameter > 8", or depth > 50 ft Actual Cost 16.10.090 A2 NA NA Actual Cost $0 23 Inspect well destructions NA NA $0.00 $024 Diameter ≤ 6", and depth ≤ 50 ft $1,086.00 16.10.090 A2 NA NA $1,086.00 $025 6" < Diameter ≤ 18", and depth ≤ 25 ft $1,244.00 16.10.090 A2 NA NA $1,244.00 $026 6" < Diameter ≤ 18", and 25 ft < depth ≤ 50 ft $1,402.00 16.10.090 A2 NA NA $1,402.00 $027 Diameter > 18", or depth > 50 ft Actual Cost 16.10.090 A2 NA NA Actual Cost $028 Inspect pole removal/replacement $616.00 16.10.090 A2 NA NA $616.00 $0 29 Encroachment Inspection30 Inspect lane closure/detour $343.00 per day 16.10.090 A3 NA NA $343.00 $0 31 Inspect awning $411.00 per address 16.10.090 A3 NA NA $411.00 $0 32 Inspect monitoring of existing wells (allows monitoring for 1 year) $711.00 16.10.090 A3 NA NA $711.00 $033 Inspect crane operations $533.00 per day 16.10.090 A3 NA NA $533.00 $034 Inspect temporary storage of construction materials $342.00 per day 16.10.090 A3 NA NA $342.00 $035 Inspect filming permits - road $454.00 16.10.090 A3 NA NA $454.00 $036 Excavation Inspection NA NA $0.00 $0 37 Inspect utility service cuts (Up to 3 within one block) $673.00 16.10.090 A4 NA NA $673.00 $0 38 Inspect potholing (up to 3 within one traffic control setup not exceeding one block) 39 Depth ≤ 10 ft $459.00 16.10.090 A4 NA NA $459.00 $0
40 Depth > 10 ft Actual Cost 16.10.090 A4 NA NA Actual Cost $041 Inspect Soil Borings (up to 3 borings within one traffic control setup not exceeding one block)42 Diameter ≤ 6", and depth ≤ 50 ft $616.00 16.10.090 A4 NA NA $616.00 $0 66
Engineering
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title Current Fee/Charge Unit Code Full Cost Subsidy % Suggested
Fee Fee Δ
43 6" < Diameter ≤ 18", and depth ≤ 25 ft $774.00 16.10.090 A4 NA NA $774.00 $044 6" < Diameter ≤ 18", and 25 ft < depth ≤ 50 ft $929.00 16.10.090 A4 NA NA $929.00 $045 Diameter > 18", or depth > 50 ft Actual Cost 16.10.090 A4 NA NA Actual Cost $046 Transportation Inspections47 Inspect oversize extralegal load moving permit (up to 4 hrs) $1,297.00 16.10.090 A5 NA NA $1,297.00 $048 Actual cost oversized extralegal load moving permit (greater than 4 hrs) Actual Cost 16.10.090 A5 NA NA Actual Cost $049 Permit Mainline Check Fees 16.10.090 B 50 Permit mainline check 0 - 15,000 LF $406 + $0.48/LF 16.10.090 B NA NA $406 + $0.48/LF $051 Permit mainline check > 15,000 LF Actual Cost 16.10.090 B NA NA Actual Cost $052 Permit Processing Fee 16.10.15553 Excavation, construction and encroachment permits $375.00 16.10.155 NA NA $375.00 $054 Joint trench excavation permits for each dry utility $740.00 16.10.155 NA NA $740.00 $055 Road closure (construction or excavation work) $529.00 16.10.155 NA NA $529.00 $056 Banner and pennants $632.00 16.10.155 NA NA $632.00 $057 Traffic control plan review Actual Cost ($350.00 min) 16.10.155 NA NA Actual Cost ($350.00 min) $058 Annual Permit Fees 16.19.05059 Drop box debris container annual permit $2,434.00 16.19.050 NA NA $2,434.00 $060 News Rack Annual Permit 16.24.02061 1 NEW news rack installation per location $207.00 16.24.020 NA NA $207.00 $062 2 NEW news racks installation per location $271.00 16.24.020 NA NA $271.00 $063 3 NEW news racks installation per location $333.00 16.24.020 NA NA $333.00 $064 Permit expiration and renewal 16.24.020 NA NA $0.00 $0 65 Permit renewal application fee $152.00 16.24.020 NA NA $152.00 $066 News rack renewal $59.00 each 16.24.020 NA NA $59.00 $0 67 Outdoor Sidewalk Dining Annual Permit 16.27.050
68 Outdoor sidewalk dining permit (new) $1,556.00 16.27.050 NA NA $1,556.00 $069 Outdoor sidewalk dining permit (renewal) $490.00 16.27.050 NA NA $490.00 $070 Other - Fees below are not in County fee schdule 16.27.05071 Final Tract or Parcel Map & Amendments New $7,747.99 0% $7,747.00 NA New feeFee decreaseFee increase greater than 50%Fee increase greater than 75% 67
27368 Via Industria, Suite 200
Temecula, CA 92590
800.755.6864 | Fax: 888.326.6864
951.587.3500 | Fax: 951.587.3510
www.willdan.com
Attachment B
April 2019
City of Cudahy, California
R e p o r t
Comprehensive Study of Service Fees
June 1, 2026
i Comprehensive Study of Service Fees
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................. i Executive Summary .............................................................................................................................. 1 City Service Fee Background ................................................................................................................. 2 Background .................................................................................................................................................. 2 California Service Fee History ...................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ................................................................................................................................... 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 5 Project Approach and Methodology ..................................................................................................... 6 Conceptual Approach................................................................................................................................... 6 Fully Burdened Hourly Rates........................................................................................................................ 6 Summary Steps of the Study ........................................................................................................................ 7 Allowable Costs ............................................................................................................................................ 7 Methodology ................................................................................................................................................ 8 Quality Control/Quality Assurance .............................................................................................................. 8 Reasons for cost increases/decreases over current fees............................................................................. 8 City Staff Contributions ................................................................................................................................ 9 Cudahy Service Fees ........................................................................................................................... 10 Cost Recovery............................................................................................................................................. 10 Subsidization .............................................................................................................................................. 10 Impact on Demand (Elasticity) ................................................................................................................... 11 Summary .................................................................................................................................................... 11 General Administrative ...................................................................................................................... 12 Analysis ...................................................................................................................................................... 12 Business Licensing .............................................................................................................................. 13 Analysis ...................................................................................................................................................... 13 Animal Control ................................................................................................................................... 14 Analysis ...................................................................................................................................................... 14 Parking Permit ................................................................................................................................... 15
ii Comprehensive Study of Service Fees
Analysis ...................................................................................................................................................... 15 Public Safety ...................................................................................................................................... 16 Analysis ...................................................................................................................................................... 16 Parks and Recreation ......................................................................................................................... 17 Analysis ...................................................................................................................................................... 17 Planning ............................................................................................................................................ 18 Analysis ...................................................................................................................................................... 18 Building & Safety and Engineering ...................................................................................................... 19 Analysis ...................................................................................................................................................... 19 Appendix A – Total Allowable Cost to be Recovered ........................................................................... 20 Appendix B – Fully Burdened Hourly Rates ......................................................................................... 21 Appendix C – Cost Recovery Analysis .................................................................................................. 24
1 Comprehensive Study of Service Fees
Executive Summary
The City of Cudahy engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges service fees. Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and program activities. This report and the appendices herein identify reasonable full cost recovery for City services and the recommended level of recovery as determined through discussion with departmental staff.
The reality of the local government fee environment is that significant increases to achieve 100% cost recovery can often not be feasible, desirable, or appropriate depending on policy direction —particularly in a single year. The recommended fees identified herein are either at or less than full cost recovery.
2 Comprehensive Study of Service Fees
City Service Fee Background
Background
As part of a general cost recovery strategy, local governments adopt fees to fund programs and services that provide limited or no direct benefit to the community as a whole. As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the government is using community funds to pay for private benefit. Unlike most revenue sources, cities have more control over the level of service fees they charge to recover costs, or the subsidies they can institute.
Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218, Proposition 26, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two-thirds of those electors voting because the charge would be considered a tax and not a fee.
California Service Fee History
Before Proposition 13, California cities were less concerned with potential subsidies and recovering the cost of their services from individual fee payers. In times of fiscal shortages, cities simply raised property taxes, which funded everything from police and recreation to development-related services. However, this situation changed with the passage of Proposition 13 in 1978.
Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the imposition of taxes for certain classes of fees. As a result, cities were required to secure a supermajority vote in order to enact or increase taxes. Since the public continues to resist efforts to raise local government taxes, cities have little control and very few successful options for new revenues. Compounding this limitation, the State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation—at the expense of local governments. As an example, in 2004-05, the Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees have severely reduced local tax revenues.
In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seven categories of exceptions. The vast majority of fees that cities would seek to adopt as part of a service fee study will most likely fall into one or more of these exemptions.
3 Comprehensive Study of Service Fees
Additional Policy Considerations
The recent trend for municipalities is to update their fee schedules to reflect the actual costs of certain public services primarily benefitting users. Service Fees recover costs associated with the provision of specific services benefiting the user, thereby reducing the use of General Fund monies for such purposes.
In addition to collecting the direct cost of labor and materials associated with processing and administering services, it is common for local governments to recover reasonable support costs. Support costs are those costs relating to a local government’s central service departments that are properly allocable to the local government’s operating departments. Central service support cost was incorporated using the resulting indirect overhead percentages determined through the Cost Allocation Plan. This plan was developed prior to the fee study to determine the burden placed upon central services by the operating departments to allocate a proportionate share of central service cost.
As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current. Therefore, it is recommended that the City include an inflationary factor in the resolution adopting the fee schedule to allow the City Council, by resolution, to annually increase or decrease the fees.
The City may employ many different inflationary factors. The most used inflator is some form of the Consumer Price Index (CPI) as it is widely well known and accepted as a measure of cost of living increase.
A similar inflator is the Bureau of Labor Statistics employment cost index that has a specific series for state and local government workers. Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor that connects more directly to the personnel costs can be suitable if there is a clear method, or current practice of obtaining said factor.
Each City should use an inflator that they believe works the best for their specific situation and needs but cannot rely solely on the CPI increase as it is incumbent upon each agency to ensure the amount of the fees charged does not exceed the reasonable estimated costs of providing the services. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every three to five years, which would include adding, amending, or removing fees for any programs/services.
4 Comprehensive Study of Service Fees
Study Objective
As the City of Cudahy seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools. These tools provide assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising revenue in local government, the City recognizes that a service fee study is a very cost-effective way to understand the total cost of services and identify potential fee deficiencies. Essentially, a service fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.
The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support. This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.
The principal goal of the study was to help the City determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
Developing a rational basis for setting fees
Identifying subsidy amount, if applicable, of each fee in the model Ensuring compliance with State law
Developing an updatable and comprehensive list of fees Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making informed policy decisions regarding the most appropriate fees, if any, to collect from individuals and organizations that require individualized services from the City.
Scope of the Study
The scope of this study encompasses a review and calculation of the service fees charged by the following Cudahy departments and fee groups:
General Administrative
Business Licensing
Animal Control
Parking Permit
Public Safety
Parks and Recreation
Planning
Building & Safety
Engineering
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultation, quality control, communication and presentations, and calculation of individual service costs (fees) or program cost recovery levels.
5 Comprehensive Study of Service Fees
Aim of the Report
The fee study focused on the cost of City services, as City staff currently provides them at existing, known, or reasonably anticipated service and staff levels. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule. The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide influential dissertation on the qualities of the utilized tools, techniques, or other approaches.
6 Comprehensive Study of Service Fees
Project Approach and Methodology
Conceptual Approach
The basic concept of a service fee study is to determine the “reasonable cost” of each service provided by the City for which it charges a service fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.
The standard fee limitation established in California law for property-related (non-discretionary) fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.
Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits, but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
Salaries & benefits of personnel involved
Operating costs applicable to fee operations
Departmental support, supervision, and administration overhead Indirect City-wide overhead costs calculated through the Cost Allocation Plan An important factor in determining the fully burdened rate is in the calculation of productive hours for personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this figure to account for calculated or anticipated hours’ employees are involved in non-billable activities such as paid vacation, sick leave, emergency leave, holidays, and other considerations as necessary. Dividing the full cost by the number of productive hours provides the FBHR.
The FBHRs are then used in conjunction with time estimates, when appropriate, to calculate a fees' cost based on the personnel and the amount of their time that is involved in providing each service.
7 Comprehensive Study of Service Fees
Summary Steps of the Study
The methodology to evaluate most service fee levels is straightforward and simple in concept. The following list provides a summary of the study process steps:
Allowable Costs
This report identifies three types of costs that, when combined, constitute the fully burdened cost of a service (Appendix A). Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
central services overhead, where
departmental and central service overhead
costs constitute support costs. These cost
types are defined as follows:
Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function. Central Services Overhead: These costs, detailed in the City’s Cost Allocation Plan, represent services provided by those Central Services Departments whose primary function is to support other City departments.
Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
8 Comprehensive Study of Service Fees
Methodology
The two methods of analysis for calculating fees used in this report are the:
Case Study Method (Standard Unit Cost Build-Up Approach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department assists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.
Programmatic Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors and policy concerns (as opposed to actual costs) tend to influence fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit the programs’ needs and goals. Typical programmatic approach cases are facility use fees, penalties, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.
Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for service fee calculations include:
Involvement of knowledgeable City staff
Clear instructions and guidance to City staff
Reasonableness tests and validation
Normalcy/expectation ranges
FTE balancing
Internal and external reviews
Cross-checking
Reasons for cost increases/decreases over current fees
Within the fee tables in Appendix C, the differences identified between the full costs calculated through the study and the fee levels currently in effect. The reasons for differences between the two can arise from a number of possible factors including:
Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions
Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
9 Comprehensive Study of Service Fees
Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
Costs that this study has identified as part of the full cost of services may not have been accounted for in a previous study
o Departmental overhead and administration costs
o Indirect overhead from the Cost Allocation Plan
Changes in processes and procedures within a department, or the City as a whole City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, which contributed and reviewed a variety of components to the study, including:
Budget and other cost data
Staffing structures
Fee and service structures, organization, and descriptions Direct and indirect work hours (billable/non-billable) Time estimates to complete work tasks
Review of draft results and other documentation
A service fee study requires significant involvement of the managers and line staff from the departments— on top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.
10 Comprehensive Study of Service Fees
Cudahy Service Fees
Cost Recovery
The cost recovery models, by department/division fee type, are presented in detail in Appendix C. Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimates for each service rendered were predominately determined by Willdan and City Staff through a time and materials survey conducted for each department/division fee included in the study. The resulting cost recovery amount represents the total cost of providing each service. The City’s current fee being charged for each service, if applicable, is provided in this section, as well, for reference.
It is important to note that the time and materials survey used to determine the amount of time each employee spends assisting in the provision of the services listed on the fee schedule is essential in identifying the total cost of providing each service. Specifically, in providing services, a number of employees are often involved in various aspects of the process, spending anywhere from a few minutes to several hours on the service.
The principal goal of this study was to identify the cost of City services, to provide information to help the City make informed decisions regarding the actual fee levels and charges. The responsibility to determine the final fee levels is a complicated task. City staff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.
City staff assumes the responsibility to develop specific fee level recommendations to present to the City Council. Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of Cudahy and administrative and political discretion.
However, in setting the level of full cost recovery for each fee, one should consider whether the service solely benefits one end user or the general community.
Subsidization
Recalling the definition of a service fee helps guide decisions regarding subsidization. The general standard is that individuals (or groups) whom receive a wholly private benefit should pay 100% of the full cost of the services. In contrast, services that are simply public benefit should be funded entirely by the general fund’s tax dollars. Unfortunately, for the decision makers, many services fall into the range between these two extremes. The graphic on the following page illustrates the potential decision basis.
Further complicating the decision, opponents of fees often assert that the activities subject to the fees provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City.
It is recommended the City consider such factors during its deliberations regarding appropriate fee levels.
Of course, subsidization can be an effective public policy tool, since it can be used to reduce fees to encourage certain activities (such as compliance inspections to ensure public safety) or allow some people to be able to afford to receive services they otherwise could not at the full cost. In addition, subsidies can
11 Comprehensive Study of Service Fees
be an appropriate and justifiable action, such as to allow citizens to rightfully access services, without burdensome costs.
Despite the intent, it is important for the City and public to understand that subsidies must be covered by another revenue source, such as the General Fund. Therefore, the general taxpayer will potentially help to fund private benefits, and/or other City services will not receive funds that are otherwise directed to cover subsidies.
Impact on Demand (Elasticity)
Economic principles of elasticity suggest that increased costs for services (higher fees) will eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions. Either of these conditions may be a desirable effect to the City. However, the level of the fees that would cause demand changes is largely unknown. The Cost of Service Study did not attempt to evaluate the economic or behavioral impacts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.
Summary
If the City’s principal goal of this study were to maximize revenues from service fees, Willdan would recommend setting service fees at 100% of the full cost identified in this study. However, we understand that revenue enhancement is not the only goal of a cost of service study, and sometimes full-cost recovery is not needed, desired, or appropriate. Other City and departmental goals, City Council priorities, policy initiatives, past experience, implementation issues, and other internal and external factors may influence staff recommendations and City Council decisions. In this case, the proper identification of additional services (new or existing services) and creation of a consistent and comprehensive fee schedule was the primary objective of this study. City staff has reviewed the full costs and identified the “recommended fee levels” for consideration by City Council. The attached appendices exhibit these unit fees individually.
The preceding sections provide background for each department or division and the results of this study’s analysis of their fees. For the full list of each fee’s analysis, refer to Appendix C of this report.
12 Comprehensive Study of Service Fees
General Administrative
The Office of the City Clerk is responsible for legislative proceedings, elections, records management, and public records including agenda and minutes. The Office of the City Clerk is committed to quality customer service, maintaining public records and upholding democratic principles through: Ensuring the legislative process, including City elections, City Council and commission meetings, are open and public; Providing access to complete and accurate public information; Working together to ensure the City Council, City Manager and City staff serve the community with openness and integrity.
Analysis
Willdan individually reviewed the services associated with General Administrative. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The services included within General Administrative consist of a yard sale permit fee, duplication fees, and others set by the State. Staff is not recommending any changes to the fee schedule as detailed in Appendix C .
13 Comprehensive Study of Service Fees
Business Licensing
The Business Licensing Division ensures that individual and organization conducting business or performing a service within the City boundaries are issued a license in accordance with City regulations.
Analysis
Willdan individually reviewed the services associated with the Business License Division that qualify as service fees. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of Business License service fees relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro-rata share of departmental costs, including indirect costs for City Central Services.
Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering costs associated with the requested service. The analysis found that current service fees are not in line with the cost of providing services. Based on feedback from Council, staff is recommending the fees be adjusted with increases to take effect January 2027 and the suggested fee amounts being recommended are detailed in Appendix C. As a result, there would be:
An increase for 6 fees implemented in January of 2027; 2 fees would decrease, and;
The remaining 86 licenses and penalties would remain as currently set.
14 Comprehensive Study of Service Fees
Animal Control
The County of Los Angeles Department of Animal Control provides a variety of services to the community that include an annual vaccination clinic that is free of charge to the residents of the City of Cudahy where free micro-chip services are also available on site.
Analysis
Animal Control services are provided by the County of Los Angeles Department of Animal Control, and the associated fees are established by the County. No analysis was done to the Animal Control services and fee levels remain unchanged as detailed in Appendix C.
15 Comprehensive Study of Service Fees
Parking Permit
City residents may request that a permit for overnight vehicle parking in accordance with the Pilot Program be issued for a specific vehicle and dwelling unit.
Analysis
Willdan individually reviewed the services associated with Parking Permits. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
An overall program cost analysis for the Parking Permit program was performed and determined that the program is currently operating at around 71% direct cost recovery. Based on feedback from the Council, staff is recommending no changes to the fee schedule and for all 3 fees to remain as currently set, as detailed in Appendix C.
16 Comprehensive Study of Service Fees
Public Safety
The Public Safety and Services Department works to reduce and eliminate blight throughout the community, enforce the Cudahy Municipal Code, increase public safety, as well as maintain the City’s parks and streets.
Analysis
Willdan individually reviewed the services associated with the Public Safety and Services Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of Public Safety Services relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. The analysis found that the current fees are subsidizing the cost of service. Based on feedback from Council, staff have suggested reasonable fee adjustments as detailed in Appendix C for each specific fee, but they would still retain some level of subsidy. As a result, there would be:
An increase to the Vehicle Impound Release Fee Related to DUI; 3 fees would remain as currently set;
the average estimated fee change would be an increase of around 16%, and; The Vehicle and Parking Violation fees would increase by CPI (3.397%):
o The fee for No Overnight Parking 12am – 6am plus penalties would increase by an average of 51%.
17 Comprehensive Study of Service Fees
Parks and Recreation
The Parks and Recreation department provides the resources necessary to maintain the City's public parks and facilities and offers quality recreation and human services programs ranging from children to senior citizen support.
Analysis
Willdan individually reviewed the services associated with the Parks and Recreation Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of most Parks and Recreation programs encompassed facility rentals and other associated recreation services. The fee for use of government owned facilities and property can be set discretionally by the City per Proposition 26 based on market or policy factors. The cost of acquisition, maintenance, repair, and upgrade to the City and subsequently the community can be offset by rental or facility use fee revenue. As such fees should be set using the knowledge of activity use for the facilities, policy desires of the City, and market factors when desirable. It is generally accepted that some Recreation programs provide a measure of public benefit to the residents and City as a whole. In addition, cities generally want to ensure that their programs and services remain affordable to the community at large, and that the programs remain competitive with surrounding jurisdictions and private businesses. An overall program cost analysis for Parks and Recreation was also performed and determined that the department is currently operating at around 7% direct cost recovery. Based on feedback from Council, staff have suggested reasonable fee adjustments to the fee schedule for non-residents, and they are detailed in Appendix C.
Non-Resident Fees:
An increase to 29 fees,
34 fees would remain as currently set, and;
The average fee change would be an increase of 103% for current fees. o Rental base fees would be increased by 150%
o Staff time fees would be normalized at $18.75
o Programming fees would be set at $90
Resident Fees:
Staff will be bringing a separate resolution for Council’s consideration to establish larger subsidies for residents than is being recommended for non-residents.
18 Comprehensive Study of Service Fees
Planning
The Planning Department is responsible for implementing the City's General Plan and Zoning Code which regulates the type and land uses within the City. Planning assists in guiding the orderly development of the community and ensures that new development is attractive and compatible with the surroundings and consistent with the City's codes and policies. The Department also reviews and processes development entitlement applications for compliance with zoning and subdivision regulations as well as conditional use permits. Planning staff provides technical and administrative support to the City Council and Planning Commission.
Analysis
Willdan individually reviewed the services associated with the Planning Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of Planning Services relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. The analysis found that most Planning fees are currently set below the full cost of providing the service. Based on feedback from Council, staff have suggested increasing fees to full cost recovery as detailed in Appendix C. As a result, there would be:
an increase to 13 fees and deposits (5 fees would change from a deposit to a flat fee); 5 fees would decrease (2 fees would change from a deposit to a flat fee); 37 new fees would be added;
5 fees would remain as currently set, and;
The average estimated fee change would be an increase of 6% for existing flat and deposit-based services.
19 Comprehensive Study of Service Fees
Building & Safety and Engineering
The Building and Safety Department is responsible for the enforcement of building, plumbing, electrical and mechanical codes. It also enforces ordinances and codes to ensure that buildings are safe by providing inspection services and plan check for new construction.
The Engineering Division reviews and approves project plans, subdivision maps, designs, technical reports and calculations of private developments, planning programs and Agency projects to ensure compliance with the Subdivision Map Act and incorporation of City requirements. It recommends, plans, develops, prepares, manages, and provides technical guidance with the development of strategic short and long range implementation of the City’s Capital Improvement Program.
The division is also involved with design, inspection and supervision of Public Works projects including streets, sidewalks, parks and municipal facilities as well as the procurement and administration of transportation grants and funds.
Analysis
The service fee schedule utilized by the Building & Safety Department and Engineering Division is that developed and regularly updated by Los Angeles County. An overall program cost analysis for Building & Safety and Engineering services was also performed and determined that they are currently operating at around 42% direct cost recovery. The Building & Safety and Engineering services and fee levels remain unchanged as detailed in Appendix C and are based on Los Angeles County’s fee schedule.
20 Comprehensive Study of Service Fees
Appendix A – Total Allowable Cost to be Recovered
Below are the total allowable costs that may be recovered through service fees; however, only a percentage of the total cost is realized as staff doesn’t just work on services related to service fees, but also works on an array of other City functions during the operational hours of the City. The amounts listed below will not reconcile to City budgets as costs that should not be included in overhead for personnel in the application of determining fully burdened hourly rates were excluded. Examples of these costs are capital, debt, monetary transfers, passthrough contract costs, and any other costs that is charged directly to the service requestor.
City of Cudahy - User Fee
Overhead Rate Calculations
Department
Total Salaries
& Benefits
Department
Operations &
Administration
Direct
Overhead
%
Indirect
Allocation
%
100: City Clerk 299,940 64,250 21% 0%
100: City Manager 590,586 108,500 18% 0%
100: Facilities Operations 464,572 248,575 54% 0%
100: Community Services 221,353 30,200 14% 91%
100: Finance 412,656 87,450 21% 0%
100: Business License 127,967 0% 55% - 100: Community Development Dept. 92,634 13,700 15% 19% 100: Building Regulation 322,631 8,200 3% 25%
100: Planning 321,908 30,050 9% 52%
100: Engineering 159,599 32,300 20% 40%
100: Code Enforcement 271,274 10,814 4% 310%
100: Recreation 882,596 432,200 49% 91%
100: Parks Maintenance 622,679 382,300 61% 72%
100: Municipal Enforcement 258,287 33,265 13% 78%
201: Gas Tax Fund 797,281 428,200 54% 127%
21 Comprehensive Study of Service Fees
Appendix B – Fully Burdened Hourly Rates
Below are fully burdened hourly rates of staff positions that provide for the services detailed in Appendix C. The FBHRs were used to determine the full cost of each service. They include the salary and benefit costs for each position as well as all applicable overhead amounts for each position. For positions in central service departments, such as the City Clerk and Finance, what is shown is the salary and benefit rate only, as the overhead of central service departments is recovered through the cost allocation plan. When a central service department position works on a fee or project in the purview of an operating department, the overhead rates of the operating department (shown in Appendix A) will be applied to that central service positions’ salary and benefit rate for full cost recovery. For any fee service request that is outside the scope of the fees detailed in Appendix C, or for services for which there is no fee currently set, the City can charge up to the full cost of the FBHR for personnel involved.
City of Cudahy - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
Position Rates
100: Building Regulation Bldg - Building Inspector $94.93 100: Building Regulation Bldg - Community Development Director $188.95 100: Building Regulation Bldg - Permit Technician $70.22 100: Business License Bus. Lic - Accounting Technician $117.70 100: Business License Bus. Lic - Assistant to City Manager $127.76 100: Business License Bus. Lic - Human Resources Specialist $89.36 100: Community Development Dept. CDD - Administrative Analyst $78.64 100: Community Development Dept. CDD - Assistant to City Manager $106.69 100: Community Development Dept. CDD - Community Development Director $618.15 100: Community Development Dept. CDD - Executive Assistant to CM $102.56 100: City Clerk Clerk - Assistant City Clerk $89.76
100: City Clerk Clerk - City Clerk $132.60
100: City Manager CM - Administrative Analyst $68.41
100: City Manager CM - Assistant to City Manager $97.86 100: City Manager CM - City Manager $386.81
100: City Manager CM - Executive Assistant to CM $89.21 100: Code Enforcement Code - Accounting Technician $324.74 100: Code Enforcement Code - Administrative Analyst $246.64 100: Code Enforcement Code - Associate Planner $306.06
100: Code Enforcement Code - Community Development Director $626.65 100: Code Enforcement Code - Community Preservation Manager $359.79
22 Comprehensive Study of Service Fees
City of Cudahy - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
100: Code Enforcement Code - Community Preservation Officer $325.62 100: Code Enforcement Code - Human Resources Specialist $246.55 100: Community Services CS - Community Services Director $221.17 100: Community Services CS - Executive Assistant to CM $163.93 100: Engineering Eng - Administrative Analyst $97.01
100: Engineering Eng - Community Development Director $246.47 100: Engineering Eng - Executive Assistant to CM $126.51 100: Engineering Eng - Permit Technician $91.59
100: Facilities Operations Facilities - Administrative Analyst $88.71 100: Facilities Operations Facilities - Assistant to City Manager $116.50 100: Facilities Operations Facilities - City Manager $309.08 100: Facilities Operations Facilities - Executive Assistant to CM $115.69 100: Facilities Operations Facilities - Human Resources Specialist $88.68 100: Facilities Operations Facilities - Maintenance Worker (Electrician) $103.99 100: Facilities Operations Facilities - Maintenance Worker (Janitorial) $74.44 100: Facilities Operations Facilities - Maintenance Worker Janitorial $82.44 100: Finance Fin - Accounting Technician $92.66
100: Finance Fin - Administrative Analyst $70.04
100: Finance Fin - Assistant to City Manager $95.02
100: Finance Fin - Executive Assistant to CM $91.34
100: Finance Fin - Finance Director $128.83
100: Finance Fin - Human Resources Specialist $70.01
100: Finance Fin - Senior Accountant $127.27
100: Human Resources HR - Administrative Analyst $83.81 100: Human Resources HR - Executive Assistant to CM $109.29 100: Municipal Enforcement Mun. Enfrcmt - Community Development Director $294.71 100: Municipal Enforcement Mun. Enfrcmt - Community Preservation Officer $120.88 100: Municipal Enforcement Mun. Enfrcmt - Executive Assistant to CM $151.27 100: Municipal Enforcement Mun. Enfrcmt - Human Resources Specialist $115.95 100: Parks Maintenance Parks - Maintenance Superintendent $385.91 100: Parks Maintenance Parks - Maintenance Supervisor $182.07 100: Parks Maintenance Parks - Maintenance Worker $126.87 100: Parks Maintenance Parks - Maintenance Worker (Electrician) $197.13 100: Planning Planning - Administrative Analyst $95.83
100: Planning Planning - Assistant Planner $100.08
100: Planning Planning - Associate Planner $118.92
100: Planning Planning - Community Development Director $243.48
23 Comprehensive Study of Service Fees
City of Cudahy - User Fee
Fully Burdened Hourly Rate Calculation
Department Title
Fully Burdened
Hourly Rate
100: Planning Planning - Executive Assistant to CM $124.98 100: Planning Planning - Human Resources Specialist $95.80 100: Planning Planning - Senior Planner $152.24
100: Recreation Rec - Administrative Analyst $164.77
100: Recreation Rec - Assistant Recreation Coordinator $157.12 100: Recreation Rec - Assistant to City Manager $223.55 100: Recreation Rec - Executive Assistant to CM $214.88 100: Recreation Rec - Recreation Coordinator (#1) $181.95 100: Recreation Rec - Recreation Coordinator (#2) $206.96 100: Recreation Rec - Recreation Program Manager $269.64 Part Time Positions
100: Facilities Operations Facilities - Administrative Clerk - PT $44.41 100: Facilities Operations Facilities - Maintenance Aide - PT $36.87 100: Municipal Enforcement Mun. Enfrcmt - Municipal Enforcement Officer - PT $55.84 100: Parks Maintenance Parks - Maintenance Aide - PT $66.56 100: Recreation Rec - Recreation Aide - PT $56.34
100: Recreation Rec - Recreation Leader - PT $56.34
100: Finance Fin - Office Clerk - PT $35.06
100: Parks Maintenance Parks - Communication Specialist - PT $57.80
24 Comprehensive Study of Service Fees
Appendix C – Cost Recovery Analysis
The following tables provide the results of the analysis, resulting full cost recovery amount, and recommended fees. For fees in which the full cost, existing fee and suggested fee is listed as “NA”, the amount or percentage was not calculable based on cost data or variable fee structure. This is most common when either the current or the suggested fee includes a variable component that is not comparable on a one to one basis, a full cost was not calculated (for penalties and fines), or when there is not a current fee amount to compare against.
GENERAL ADMINISTRATIVE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Photocopy/Reproduction of Paper Public Records $0.25 Per Copy $0.25 0% $0.25 $02 CD or DVD of Digital Public Records or Recordings $5.00 Per CD or DVD $5.00 0% $5.00 $03 Returned Check Charge $35.00 NA NA $25 Initial $35 Each Subsequent $0 4 Notice of Intent Initiative Fee $200.00 NA NA $200.00 $05 Nomination Papers Filing Fee $25.00 NA NA $25.00 $0 6 Yard Sale
7 Permit Fee $10.00 NA NA $10.00 $0
1
BUSINESS LICENSE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Ambulance operator License - Per License $10.00 flat rate NA NA $10.00 $02 Ambulance Vehicle License - Per New vehicle $70.00 per unit From 0 - 99,999,999 NA NA $70.00 $03 Ambulance Driver License - Per Vehicle (renew) $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 4 Ambulance Driver License - Per Driver $10.00 per unit From 0 - 99,999,999 NA NA $10.00 $0 5 Ambulance Attendance - Per Attendant $10.00 per unit From 0 - 99,999,999 NA NA $10.00 $0 6 Amusements, Bowling - Annual Fee $70.00 flat rate NA NA $70.00 $0 7 Amusements, Dance Hall - Annual Fee $300.00 flat rate NA NA $300.00 $0 8 Amusement, Circus - Daily Fee $200.00 per unit From 0 - 99,999,999 NA NA $200.00 $0 9 Amusement, Carnival - Daily Fee $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 10 Amusement, Theater - Annual Fee Range11 From 0 - 500 $100.00 step rate NA NA $100.00 $0 12 From 501 - 15,000 $150.00 step rate NA NA $150.00 $0 13 From 15,001 - 99,999,999 $150.00 step rate NA NA $150.00 $0 14 Auction Sales - Weekly Fee $200.00 per unit From 0 - 99,999,999 NA NA $200.00 $0 15 Secondhand Dealer - Annual Fee $70.00 flat rate NA NA $70.00 $0 16 Auto Wrecking - Annual Fee $300.00 flat rate NA NA $300.00 $0 17 Junk Dealers - Annual Fee $300.00 flat rate NA NA $300.00 $0 18 Taxicab/Non-Emergency Operator - Annual Fee $60.00 flat rate NA NA $60.00 $0 19 Taxicab/Non-Emergency Vehicles - Per Vehicle $24.00 per unit From 0 - 99,999,999 NA NA $24.00 $0 20 Taxi/Non-Emergency Driver License - Per Driver $10.00 per unit From 0 - 99,999,999 NA NA $10.00 $0 21 Private Patrolman's License - Annual Fee $10.00 flat rate NA NA $10.00 $0 22 Contractor-General - Annual Fee $200.00 flat rate NA NA $200.00 $0 23 Contractor - 6 Months General $100.00 flat rate NA NA $100.00 $0 24 Contractor - Subcontractor - Annual Fee $100.00 flat rate NA NA $100.00 $0 25 Contractor - 3 Months Subcontractor $25.00 flat rate NA NA $25.00 $0 26 Contractor - 6 Months Subcontractor $50.00 flat rate NA NA $50.00 $0 27 Contractor - 9 Months Subcontractor $75.00 flat rate NA NA $75.00 $0 28 Delivery Vehicle - Per Vehicle $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 29 Other Business Based on Gross NA NA Based on Gross $030 From 0 to 9,000 $50.00 flat rate NA NA $50.00 $0 31 From 10,000 to 49,000 $90.00 flat rate NA NA $90.00 $0 32 From 50,000 to 74,999 $120.00 flat rate NA NA $120.00 $0 33 From 75,000 to 99,000 $140.00 flat rate NA NA $140.00 $0 34 From 100,000 to 199,999 $184.00 flat rate NA NA $184.00 $0 35 From 200,000 to 299,999 $264.00 flat rate NA NA $264.00 $0 36 From 300,000 to 399,999 $336.00 flat rate NA NA $336.00 $0 37 From 400,000 to 499,999 $400.00 flat rate NA NA $400.00 $0 38 From 500,000 to 599,999 $456.00 flat rate NA NA $456.00 $0 39 From 600,000 to 699,999 $504.00 flat rate NA NA $504.00 $0 40 From 700,000 to 799,999 $544.00 flat rate NA NA $544.00 $0 41 From 800,000 to 899,999 $576.00 flat rate NA NA $576.00 $0 42 From 900,000 to 999,999 $600.00 flat rate NA NA $600.00 $0 43 From 1,000,000 to 1,999,999 $740.00 flat rate NA NA $740.00 $044 From 1,200,000 to 1,299,999 $880.00 flat rate NA NA $880.00 $045 From 1,300,000 to 1,399,999 $1,020.00 flat rate NA NA $1,020.00 $0 46 From 1,400,000 to 1,499,999 $1,160.00 flat rate NA NA $1,160.00 $0 47 From 1,500,000 to 1,599,999 $1,300.00 flat rate NA NA $1,300.00 $0 2
BUSINESS LICENSE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 48 From 1,600,000 to 1,699,999 $1,440.00 flat rate NA NA $1,440.00 $0 49 From 1,700,000 to 1,799,999 $1,580.00 flat rate NA NA $1,580.00 $050 From 1,800,000 to 1,899,999 $1,720.00 flat rate NA NA $1,720.00 $051 From 1,900,000 to 1,999,999 $1,860.00 flat rate NA NA $1,860.00 $052 From 2,000,000 to 99,999,999 $2,000.00 flat rate NA NA $2,000.00 $0 53 Motels and Hotels - Annual Fee54 Room/Units 0 - 10 $30.00 step rate NA NA $30.00 $055 Room/Units 11 - 15 $40.00 step rate NA NA $40.00 $0 56 Room/Units 16 - 99,999,999 $50.00 step rate NA NA $50.00 $057 Advertising Billboards - Per Structure $100.00 step rate 0 - 1 NA NA $100.00 $058 Each Additional Structure $10.00 per unit 2 - 99,999,999 NA NA $10.00 $0 59 Advertising, Distributing handbills or merchandise, or both - Annual Fee $100.00 flat fee From 0 - 99,999,999 NA NA $100.00 $060 Advertising, Distributing handbills or merchandise, or both - Monthly Fee $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 61 Advertising, Distributing handbills or merchandise, or both - Daily Fee $20.00 per unit From 0 - 99,999,999 NA NA $20.00 $0 62 Advertising Sound Truck Annual - Per Vehicle $200.00 per unit From 0 - 99,999,999 NA NA $200.00 $063 Advertising Sound Truck - Daily $40.00 per unit NA NA $40.00 $064 Other Outside Business - Annual Fee $50.00 flat rate NA NA $50.00 $0 65 Outside Contractor $200.00 flat rate NA NA $200.00 $0 66 Patrol System - First Year $300.00 flat rate NA NA $300.00 $067 Patrol System - Renewal $150.00 flat rate NA NA $150.00 $0 68 Trucks, Trucking, and U Hire - Annual Fee $70.00 flat rate NA NA $70.00 $0 69 Video Games - Annual Fee $150.00 flat rate Operating and maintenance of video games, per machine NA NA $150.00 $070 Video Games - Annual Fee $250.00 flat rate Offering video games or displayingvideo games for public patronage, one or moremachines per location NA NA $250.00 $0
71 Trailer Park - Per Space $2.00 per unit From 0 - 99,999,999 NA NA $2.00 $072 Inspection Fee - Per Inspection $62.50 per unit From 0 - 99,999,999 $112.04 0% $112.00 $50 73 Annual Inspection Fee $120.00 flat rate $112.04 0% $112.00 -$874 Special Inspection Fee $60.00 flat rate $112.04 0% $112.00 $5275 Solicitors Principal - Annual Fee $200.00 flat rate NA NA $200.00 $076 Solicitors - Quarterly, Each Additional $6.00 per unit From 0 - 99,999,999 NA NA $6.00 $077 Rental Property Manager $30.00 per unit From 5 - 99,999,999 NA NA $30.00 $0 78 Exempt $0.00 NA NA $0.00 $0
79 Non Profit $0.00 NA NA $0.00 $080 Auto Emissions Testing $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 81 Home Occupation $50.00 flat rate NA NA $50.00 $0
82 Handbills - Annual $100.00 flat rate NA NA $100.00 $083 Handbills - Monthly $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $0 84 Handbills - Daily $20.00 per unit From 0 - 99,999,999 NA NA $20.00 $085 Homeowners Association – 1st Year $75.00 flat rate NA NA $75.00 $086 Homeowners Association - Annual Renewal $15.00 flat rate NA NA $15.00 $087 Sale of Goods Wheeled Vehicle - Annual Fee $50.00 per unit From 0 - 99,999,999 NA NA $50.00 $088 Wireless Digital Communication $0.05 per unit From 0 - 99,999,999 NA NA $0.05 $0 3
BUSINESS LICENSE FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 89 Disability Access and Education Fund $4.00 flat rate State AB1186P ($3.60) & AB1186R ($.40) NA NA $4.00 $0 90 Change of Address $5.00 flat rate $58.85 1% $58.00 $53 91 Administration Fee $30.00 flat rate $147.13 0% $147.00 $117 92 Change Business Name $5.00 flat rate $113.30 0% $113.00 $108 93 Late Fee/Penalties 15% a Month Up to 50% maximum NA NA 15% $0 94 Interest 0.5% a Month After maximum penalty is reached NA NA 0.5% $0 95 Processing Fee $30.00 flat rate $113.30 0% $113.00 $8396 Sidewalk Vending Permit $560.00 $457.67 0% $457.00 -$103 New feeFee decreaseFee increase greater than 50%Fee increase greater than 75% 4
ANIMAL CONTROL FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Altered Dog $22.00 Standard Licensing NA NA Set by LA County NA2 Altered Cat $5.45 Standard Licensing NA NA Set by LA County NA 3 Unaltered Dog $65.00 Standard Licensing NA NA Set by LA County NA 4 Unaltered Cat $11.00 Standard Licensing NA NA Set by LA County NA 5 Senior-owned* Dog $8.00 *Senior age is defined as 60 years, Standard Licensing NA NA Set by LA County NA6 Delinquent Charge Equal to amount of License Delinquency charge applies after 10 days NA NA Set by LA County NA7 Field Enforcement Fee $43.00 Licensing initiated in the field NA NA Set by LA County NA 5
PARKING PERMIT FEES
# Title
Current Fee/Charge Unit Notes
Direct Cost (no Indirect) Subsidy % Suggested Fee Fee Δ Resident Overnight Parking Excludes holidays
1 Annual Per Unit Permit $150.00 per vehicle up to three vehicles per property $212.74 29% $150.00 $02 Temporary Permits:3 Weekly permit $20.00 $28.37 29% $20.00 $04 Guest Overnight Parking $3.00 per day Excludes holidays $4.25 29% $3.00 $0 City residents may request that a permit for overnight vehicle parking in accordance with the Pilot Program be issued for a specific vehicle and dwelling unit. 6
PUBLIC SAFTEY FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy %
Suggested
Fee Fee Δ
1 Vehicle impound release fee $271.00 $600.91 55% $271.00 $02 Vehicle impound release fee related to DUI $474.00 $600.91 0% $600.00 $1263 Vehicle inspection for correctable violation $13.50 $119.93 89% $13.50 $04 Verification of disabled person placard for correctable violation $27.00 $119.93 77% $27.00 $0 7
VEHICLE AND PARKING VIOLATIONS
Fines for Specified Violations of the CMC Resolution No. 15-41 # Section Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 10.04.020 Posted Street Weight Limited 6,000 Pounds $114.00 Payment Received Up to 21 days after Notice Date NA NA $118.00 $4 2 1st Penalty $109.00 Payment Received 22 to 35 days after Notice Date NA NA $113.00 $4 3 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1 4 10.04.040(3) No Stopping Anytime $47.00 Payment Received Up to 21 days after Notice Date NA NA $49.00 $2 5 1st Penalty $26.00 Payment Received 22 to 35 days after Notice Date NA NA $27.00 $1 6 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $16.00 $1 7 10.04.050 Unlawful parking city public ground $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 8 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 9 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1 10 10.04.060 Driving on public property and in parks $58.00 Payment Received Up to 21 days after Notice Date NA NA $60.00 $2 11 1st Penalty $52.00 Payment Received 22 to 35 days after Notice Date NA NA $54.00 $2 12 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $113 10.04.070 Election day polling place parking $38.00 Payment Received Up to 21 days after Notice Date NA NA $39.00 $1 14 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 15 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $116 10.04.080(1) Red zone $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 17 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $1 18 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $119 10.04.080(2) Green zone (20 min. only) $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 20 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $1 21 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $122 10.040.080(3) Yellow zone loading and unloading 20 min. $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 23 1st Penalty $16.00 Payment Received 22 to 35 days after Notice Date NA NA $17.00 $1 24 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $125 10.040.080(4) White zone loading and unloading passengers $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 26 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $1 27 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $128 10.04.090 Unlawful Parking Vendors $54.00 Payment Received Up to 21 days after Notice Date NA NA $56.00 $2 29 1st Penalty $49.00 Payment Received 22 to 35 days after Notice Date NA NA $51.00 $2 30 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $131 10.08.060 No Overnight Parking 12am - 6am $47.00 Payment Received Up to 21 days after Notice Date NA NA $64.00 $17 32 1st Penalty $26.00 Payment Received 22 to 35 days after Notice Date NA NA $30.00 $4 33 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $30.00 $1534 10.08.060(2) Restricted Parking Monday 8:30am - 1:30pm $47.00 Payment Received Up to 21 days after Notice Date NA NA $49.00 $2 35 1st Penalty $26.00 Payment Received 22 to 35 days after Notice Date NA NA $27.00 $1 36 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $16.00 $137 10.08.060(2) Restricted Parking Tuesday 8:30am - 1:30pm $47.00 Payment Received Up to 21 days after Notice Date NA NA $49.00 $2 38 1st Penalty $26.00 Payment Received 22 to 35 days after Notice Date NA NA $27.00 $1 39 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $16.00 $140 10.08.060(2) Restricted Parking Monday & Thursday 12:00am - 6:00am $47.00 Payment Received Up to 21 days after Notice Date NA NA $49.00 $2 41 1st Penalty $26.00 Payment Received 22 to 35 days after Notice Date NA NA $27.00 $1 42 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $16.00 $143 15.44.120(b) Parking in non-designated parking area $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 44 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 45 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $146 15.44.140 Failure to park in designated parking spaces $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 47 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 48 2nd Penalty $15.00 Payment Received 36 days after Notice Date NA NA $16.00 $149 15.44.160 No vehicle maintenance in public parking areas $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 50 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 51 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $152 15.64.010 Parking time limits $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 8
VEHICLE AND PARKING VIOLATIONS
Fines for Specified Violations of the CMC Resolution No. 15-41 # Section Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 53 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $154 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $155 15.64.100A Parking disconnected trailer $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $256 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $157 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $158 15.64.140 Temporary no parking $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 59 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $160 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $161 15.64.270A Parking on private/public property without consent $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 62 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $163 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $164 15.64.280 Parking wrong side of street $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 65 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $166 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $167 15.64.310 Parking of Vehicle Transporting Hazardous Materials $385.00 Payment Received Up to 21 days after Notice Date NA NA $398.00 $13 68 1st Penalty $103.00 Payment Received 22 to 35 days after Notice Date NA NA $106.00 $369 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $170 15.76.120A Repairing vehicle on street $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 71 1st Penalty $11.00 Payment Received 22 to 35 days after Notice Date NA NA $11.00 $072 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $173 15.76.130 Washing vehicle on street $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $274 1st Penalty $11.00 Payment Received 22 to 35 days after Notice Date NA NA $11.00 $075 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $176 20.76.250(3) No parking front or side yard $41.00 Payment Received Up to 21 days after Notice Date NA NA $42.00 $177 1st Penalty $11.00 Payment Received 22 to 35 days after Notice Date NA NA $11.00 $078 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $179 22500(b) Parking on crosswalk $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 80 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $181 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $182 22500(e) Blocking driveway $48.84 Payment Received Up to 21 days after Notice Date NA NA $50.00 $183 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $184 2nd Penalty $11.00 Payment Received 36 days after Notice Date NA NA $11.00 $085 22500(f) Vehicles on sidewalk $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 86 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $187 2nd Penalty $11.00 Payment Received 36 days after Notice Date NA NA $11.00 $088 22500(h) Double parking $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 89 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $190 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $191 22500(l) Blocking disabled access ramp $277.00 Payment Received Up to 21 days after Notice Date NA NA $286.00 $9 92 1st Penalty $16.00 Payment Received 22 to 35 days after Notice Date NA NA $17.00 $193 2nd Penalty $0.00 Payment Received 36 days after Notice Date NA NA $0.00 $094 22500.1 Parking in fire lane $65.00 Payment Received Up to 21 days after Notice Date NA NA $67.00 $2 95 1st Penalty $60.00 Payment Received 22 to 35 days after Notice Date NA NA $62.00 $296 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $197 22502(a) Parking 18” from curb $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 98 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $199 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1 100 22507.8(b) Disabled parking off street $358.00 Payment Received Up to 21 days after Notice Date NA NA $370.00 $12 101 1st Penalty $16.00 Payment Received 22 to 35 days after Notice Date NA NA $17.00 $1 102 2nd Penalty $0.00 Payment Received 36 days after Notice Date NA NA $0.00 $0103 22507.8(c) Parking disabled cross hatched boundary lines $358.14 Payment Received Up to 21 days after Notice Date NA NA $370.00 $12 104 1st Penalty $16.00 Payment Received 22 to 35 days after Notice Date NA NA $17.00 $1 9
VEHICLE AND PARKING VIOLATIONS
Fines for Specified Violations of the CMC Resolution No. 15-41 # Section Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 105 2nd Penalty $0.00 Payment Received 36 days after Notice Date NA NA $0.00 $0106 22514 Parking fire hydrant $65.00 Payment Received Up to 21 days after Notice Date NA NA $67.00 $2 107 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $1 108 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1109 22515 Unattended Motor Vehicle Running $43.00 Payment Received Up to 21 days after Notice Date NA NA $44.00 $1 110 1st Penalty $22.00 Payment Received 22 to 35 days after Notice Date NA NA $23.00 $1 111 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1112 4000(a)(1) Expired registration $60.00 Payment Received Up to 21 days after Notice Date NA NA $62.00 $2 113 1st Penalty $54.00 Payment Received 22 to 35 days after Notice Date NA NA $56.00 $2 114 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1115 5200(a) No front plate $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 116 1st Penalty $43.00 Payment Received 22 to 35 days after Notice Date NA NA $44.00 $1 117 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1118 5204(a) No tags $70.00 Payment Received Up to 21 days after Notice Date NA NA $72.00 $2 119 1st Penalty $65.00 Payment Received 22 to 35 days after Notice Date NA NA $67.00 $2 120 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1121 9.04.360 Parking Vehicle for Sale $49.00 Payment Received Up to 21 days after Notice Date NA NA $51.00 $2 122 1st Penalty $27.00 Payment Received 22 to 35 days after Notice Date NA NA $28.00 $1 123 2nd Penalty $16.00 Payment Received 36 days after Notice Date NA NA $17.00 $1 (1) Code references 4000 to 22515 can be found in the State of California Vehicle Code(2) Code references 9.04.360 to 10.040.090 & 20.76.250 can be found in the Cudahy Municipal Code(2) Code references 15.44.120 to 15.76.130 can be found in the Los Angeles County Code. (Per CMC 10.04.010 the City has Adopted Title 15 of the Los Angeles County Code)New feeFee decreaseFee increase greater than 50%Fee increase greater than 75% 10
PARKS & RECREATION DEPARTMENT
# Title
Current Fee/Charge Unit Notes Full Cost Subsidy %
Suggested Fee(Non-Residents) Unit Fee Δ
1 FACILITY RENTAL FEES
2 Clara St Park3 Turner Hall Capacity: Assembly-400 Banquet-220 4 Base $300.00 $4,235.37 82% $750.00 $4505 Deposit (Refundable) $200.00 NA NA $200.00 $06 Insurance $220.00 NA NA NA NA 7 Kitchen $50.00 $705.89 82% $125.00 $75
8 Set-up & Tear-down $93.75 $366.21 36% $234.00 $140
9 Staff Time N/A $1,126.80 98% $18.75 per hour $19
10 MPR 2 Capacity: Assembly-100 Banquet-75
11 Base N/A $1,058.84 76% $250.00 $250
12 Deposit (Refundable) $100.00 NA NA $100.00 $0
13 Insurance $110.00 NA NA NA NA
14 Set-up & Tear-down N/A NA NA NA NA15 Staff Time $18.75 per hour $56.34 67% $18.75 per hour $016 Cudahy Park17 Bedwell Hall Capacity: Assembly-175 Banquet-11018 Base $100.00 $1,411.79 82% $250.00 $150 19 Deposit (Refundable) $100.00 NA NA $100.00 $0
20 Insurance $150.00 NA NA NA NA
21 Kitchen $25.00 $352.95 82% $62.00 $3722 Set-up & Tear-down $50.00 $140.85 11% $125.00 $75 23 Staff Time N/A $1,126.80 98% $18.75 per hour $1924 Lugo Park25 MPR 1 Capacity: Assembly-100 Banquet-75 26 Base $10.00 per hour NA NA $250.00 per hour $240
27 Deposit (Refundable) $100.00 NA NA $100.00 $0
28 Insurance $100.00 NA NA NA NA
29 Kitchen N/A $352.95 82% $62.00 $62
30 Set-up & Tear-down N/A NA NA NA NA
31 Staff Time N/A $56.34 67% $18.75 per hour $19
32 Picnic Shelter33 Base N/A Capacity: Assembly-40 Banquet-40 NA NA NA NA34 Deposit (Refundable) $25.00 NA NA $100.00 $75 35 Insurance N/A NA NA NA NA
36 Kitchen N/A NA NA NA NA37 Set-up & Tear-down N/A NA NA NA NA38 Staff Time N/A NA NA NA NA39 FIELD RENTAL FEE SCHEDULE 40 Cudahy Park41 Baseball Diamond 1 *Must have possession of insurance 42 Base $200.00 per day (7 hours) or $25/hour 7 hours $2,823.58 82% $500.00 $30043 Deposit N/A NA NA NA NA 44 Field Lights $10.00 per hour $10.00 0% $10.00 per hour $0 45 Staff Time $15.00 per hour $56.34 67% $18.75 per hour $4 46 Baseball Diamond 2 *Must have possession of insurance 47 Base $200.00 per day (7 hours) or $25/hour 7 hours $2,823.58 82% $500.00 $300 48 Deposit N/A NA NA NA NA49 Field Lights $10.00 per hour $10.00 0% $10.00 per hour $0 50 Staff Time $15.00 per hour $56.34 67% $18.75 per hour $4 51 Soccer Field (Equivalent Field Size) *Must have possession of insurance 52 Base $200.00 per day (7 hours) or $25/hour 7 hours $2,823.58 82% $500.00 $300 53 Deposit N/A NA NA NA NA54 Field Lights $10.00 per hour $10.00 0% $10.00 per hour $0 11
PARKS & RECREATION DEPARTMENT
# Title
Current Fee/Charge Unit Notes Full Cost Subsidy %
Suggested Fee(Non-Residents) Unit Fee Δ
55 Staff Time $15.00 per hour $56.34 67% $18.75 per hour $4 56 Basketball Courts *Must have possession of insurance 57 Base $200.00 per day (7 hours) or $25/hour 7 hours $2,823.58 82% $500.00 $300 58 Deposit N/A NA NA NA NA59 Field Lights $10.00 per hour $10.00 0% $10.00 per hour $0 60 Staff Time $15.00 per hour $56.34 67% $18.75 per hour $4 61 Lugo Park62 Soccer Field A and B (Whole) *Must have possession of insurance 63 Base $300.00 per day (6 hours) or $40/hour $4,235.37 82% $750.00 $450 64 Deposit (Refundable) $100.00 NA NA $100.00 $0
65 Field Lights $10.00 per hour $10.00 0% $10.00 per hour $0 66 Staff Time $15.00 per hour $56.34 67% $18.75 per hour $467 Clara Park68 Gymnasium (Whole) *Must have possession of insurance 69 Base $50.00 hourly or $90.00 hourly+ per hour (+) Price Reflects during hours of operation $1,270.61 82% $225.00 per hour $135 70 Deposit $200.00 NA NA $200.00 $071 Field Lights N/A NA NA NA NA72 Staff Time $15.00 per hour 100 people in attendance = 2 staff members200 people in attendance = 4 staff members300 people in attendance = 6 staff members $56.34 67% $18.75 per hour $4
73 Programming
74 Youth sports (per 8 week season)75 Registration fee 45.00 per child costs are for 8 week season one game and one practice per week for about 200 participants. 5 divisions, 4 teams per division, does not include purchse of sports equipment, only unifomr and referee costs $364.16 75% $90.00 $45
76 Ballet 45.00 per child currently 10 participants the cost is per quarter $303.34 70% $90.00 $45 77 Karate 45.00 per child currently 25 participants the cost is per quarter $339.40 73% $90.00 $4578 Hiphop 45.00 per child currently 5 participants the cost is per quarter $303.34 70% $90.00 $4579 Swap Meet 80 10ft x 10ft Resident $20.00 Charged monthly NA NA $20.00 $0 81 8ft x 10ft Resident $15.00 Charged monthly NA NA $15.00 $082 10ft x 10ft Non-Resident $25.00 Charged monthly NA NA $25.00 $0 83 8ft x 10ft Non-Resident $20.00 Charged monthly NA NA $20.00 $0 84 Trial Day Resident $30.00 Charged monthly NA NA $30.00 $0 85 Trial Day Non-Resident $35.00 Charged monthly NA NA $35.00 $0 New feeFee decreaseFee increase greater than 50%Fee increase greater than 75%* The Insurance must name the City of Cudahy as an additional insured on the General Liability Policy and provide the City with both a Certificate of Insurance and the appropriate endorsements. 12
PLANNING AND ZONING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy %
Suggested
Fee Fee Δ
1 Public Notice Rates Actual Cost
If applicable, the Applicant is responsible for paying the actual cost of public noticing including but not limited to radius maps, mailing labels, newspaper publications, and distribution costs. The actual cost will be provided to the Applicant by the Planning Division.
NA NA Actual Cost $0
2 Los Angeles County Register Actual Cost
The Applicant is responsible for all required Los Angeles County posting fees which includes, but is not limited to environmental notices. Please refer to LA County's fees for the actual cost.
NA NA Actual Cost $0
3 Planning Entitlement Fee Schedule
If the entitlement application is terminated pursuant to CMC Section 20.84.090 (C), the applicant must submit a new application, including all additional application fees. 4 Conditional Use Permit (CUP) $5,000.00 Excludes On- and Off- Sale Alcohol Use Permits $7,166.88 0% $7,166.00 $2,1665 Variance (VAR) $5,000.00 $5,796.75 0% $5,796.00 $7966 Zone Change (ZC) or Text Amendment (ZTA) $7,500.00 $5,693.41 0% $5,693.00 -$1,8077 Zoning Clearance (Building Permits) $157.00 $297.30 0% $297.00 $1408 Sign Permit (Permanent) $260.00 $178.38 0% $178.00 -$829 Environmental Review/Determination $10,000.00 Varies by Project. The actual amount payable by the Applicant is subject to final cost confirmation by Planning Division. NA NA $10,000.00 Variable 10 Development Review Permit (DRP), Minor $1,200.00 $1,492.20 0% $1,492.00 $292 11 Development Review Permit (DRP), Major $5,000.00 $7,410.37 0% $7,410.00 $2,41012 Tentative Tract Map (TTM)/Tentative Parcel Map (TPM) $7,500.00 $5,691.26 0% $5,691.00 -$1,80913 Decision Appeal to Community Development Director $1,193.00 $828.59 0% $828.00 -$365 14 Decision Appeal to Planning Commission/City Council $2,495.00 $3,564.77 0% $3,564.00 $1,069 15 Rebuild Letter/Zoning Verification Letter (ZVL) $244.00 $622.71 0% $622.00 $37816 Temporary Use Permit (TUP) $610.00 $1,359.67 0% $1,359.00 $749 17 Lot Line Adjustment/Merger $2,000.00 $2,075.08 0% $2,075.00 $75 18 Development Agreement (DA) $10,000.00 $11,237.23 0% $11,237.00 $1,237 19 Commercial Cannabis Development Agreement $10,000.00 CMC Section 5.20.070(6) - Actual amount payable by applicant subject to final cost confirmation by City $11,389.17 0% $11,389.00 $1,389 20 Cannabis Development Review Permit $6,500.00 Actual amount payable by applicant subject to final cost confirmation by City. $9,252.99 0% $9,252.00 $2,752 21 Cannabis Commercial Permit Application $11,590.00 CMC Section 5.20.060(1) $4,875.95 0% $4,875.00 -$6,71522 Cannabis Retail Permit Application $15,725.00 Resolution No. 23-16 $19,000.57 0% $19,000.00 $3,27523 General Plan Amendment (GPA) New fapp $12,408.04 0% $12,408.00 NA 24 Specific Plan (SP) New $6,358.93 0% $6,358.00 NA
25 Minor Deviation (MD) New $1,491.36 0% $1,491.00 NA
26 Planned Development Permit (PD) New $2,614.55 0% $2,614.00 NA 27 Zoning Clearance (Business License/Home Occupation) New $184.12 0% $184.00 NA 28 Zoning Code Interpretation New $547.95 0% $547.00 NA 29 Temporary Sign Permit (TSP) New $256.33 0% $256.00 NA30 Reasonable Accomodation New $2,020.13 0% $2,020.00 NA 31 Accessory Dwelling Unit Design Variance New $1,398.41 0% $1,398.00 NA32 Project Modification or Amendment, Community Development Director Approval New $659.70 0% $659.00 NA33 Project Modification or Amendment, Planning Commission Approval New $1,279.66 0% $1,279.00 NA34 Project Time Extension Request, Community Development Director Approval New $359.58 0% $359.00 NA35 Project Time Extension Request, Planning Commission Approval New $975.19 0% $975.00 NA36 Preliminary Development Review (Major) New $2,196.22 0% $2,196.00 NA 13
PLANNING AND ZONING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy %
Suggested
Fee Fee Δ
37 Preliminary Development Review (Minor) New $861.51 0% $861.00 NA 38 Off-Menu Bonus Concession Permit New $1,070.75 0% $1,070.00 NA39 Development Review Permit (DRP), Minor (Master Sign Program) New $1,052.78 0% $1,052.00 NA40 Development Review Permit (DRP), Major (Master Sign Program) New $3,146.27 0% $3,146.00 NA41 Conditional Use Permit (CUP)- Minor (Alcohol) New $1,336.49 0% $1,336.00 NA 42 Conditional Use Permit (CUP)- (Alcohol) New $1,849.33 0% $1,849.00 NA 43 Adult-Oriented Business Operator/Entertainer Permit New CMC Section 20.52.020(A)(3)(g) & CMC Section 20.52.020(J)(3)(k) $2,749.73 0% $2,749.00 NA 44 Legal Revew of Conditions, Covenants, and Restrictions (CC&Rs) New CMC Section 20.52.190 $1,375.00 0% $1,375.00 NA 45 Planning Inspection Fee New up to 3 inspections $271.15 0% $271.00 NA46 Density Bonus and/or Concessions Request New $1,070.75 0% $1,070.00 NA 47 Affordable Housing Agreement New Plus City Attorney actual costs $1,126.40 0% $1,126.00 NA48 Inclusionary Housing In-Lieu Fee, Rental Units 62.00 Per Square Foot Refer to Resolution No. 22-15 NA NA $62.00 $049 Inclusionary Housing In-Lieu Fee, For-Sale Units 104.00 Per Square Foot Refer to Resolution No. 22-15 NA NA $104.00 $050 GP/Advanced Planning Maintenance Fee New 8% 0% 8% NA51 RETAIL CANNABIS 52 Cannabis Retail Performance Review New CMC Section 5.30.090(3) $6,921.76 0% $6,921.00 NA53 Cannabis Retail Appeal New CMC Section 5.30.110(2) $3,839.77 0% $3,839.00 NA 54 Cannabis Retail Change of Location Request New CMC Section 5.30.120(1) $2,712.41 0% $2,712.00 NA 55 Cannabis Retail Transfer Request New CMC Section 5.30.130(1) $2,498.33 0% $2,498.00 NA56 Background Check New CMC Section 5.30.180(12) NA NA Actual Cost NA57 COMMERCIAL CANNABIS 58 Application Acceptance & Processsing New 5.20.060(2)(a); 5.20.060(2)(b) $7,213.59 0% $7,213.00 NA59 Issuance Fee New 5.20.060(2)(c); Cost of Preparing Development Agreement, Planning Commission and City Council Review $16,412.14 0% $16,412.00 NA 60 Amendments/Changes to Application New 5.20.060(2)(d); 5.20.070(9)(f) $1,799.44 0% $1,799.00 NA 61 Commercial Cannabis Permit (CCP) Renewal Fee New 5.20.060(2)(e) $5,802.97 0% $5,802.00 NA62 Commercial Cannabis Permit Transfer Request New 5.20.070(9)(b) $3,554.76 0% $3,554.00 NA63 Changing, Altering or Modifying Location Request New 5.20.070(11)(c); Subject to City Council Approval $4,951.52 0% $4,951.00 NA New feeFee decreaseFee increase greater than 50%Fee increase greater than 75% 14
HOUSING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy %
Suggested
Fee Fee Δ
Annual Rental Registration Application Fee $126.00 Resolution No. 24-39 NA NA $126.00 $0Rental Registration Exemption/Verification Fee $91.00 Resolution No. 24-39 NA NA $91.00 $0 15
BUILDING FEES
# Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Administrative Fines Offenses within a 12 month period of time. 2 First offense $108.00 NA NA $108.00 $03 Second offense $217.00 NA NA $217.00 $04 Third or greater offense $542.00 NA NA $542.00 $05 Inspection fee $207.08 per hour $165.15 0% $165.00 -$42 6 Re-inspection fee $199.40 per hour $130.04 0% $130.00 -$69 7 Late payment penalty Payment must be made by date on citation. 10% annual interest on fines not paid within 60 days New feeFee decreaseFee increase greater than 50%Fee increase greater than 75% 16
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
1 For the issuance of each permit $58.252 SYSTEM FEE SCHEDULE Note: The following do not include permit issuing fee. 3 New Residential Buildings4
For new multifamily residential buildings (apartments and condominiums) having three (3) or more living units not including garages, carports, and other noncommercial automobile storage areas constructed at the same time, per square foot. $0.17 per sq. foot
For garages, carports, and other accessory buildings used in conjunction with multi-familyresidential buildings use BRANCH CIRCUIT FEE OR UNIT FEE SCHEDULE. 5 For new single and two-family residential buildings not including garages, carports and other minor accessory buildings constructed at the same time, per square foot. $0.33 per sq. foot
For garages, carports, and other minor accessory buildings constructed at the same timeas the single or two-family residential buildings a fee will not be required. For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use BRANCH CIRCUIT FEE OR UNIT FEE SCHEDULE. 6 Private Swimming Pools7
For new private, residential, inground swimming pools for single, or multifamily occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool $171.15 each
8 For other types of swimming pools, therapeutic whirlpools, spas, hot tubs and alterations to existing swimming pools $115.19 each The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. 17
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
9 Carnivals and Circuses
10 For electric generators and electrically driven rides $82.19 each11 For mechanically driven rides and walk-through attractions or displays having electric lighting $34.46 each 12 For a system of area and booth lighting $34.46 each13 Temporary Power Service14 For a temporary service power pole or pedestal, including all pole or pedestal mounted receptacle outlets and appurtenances $92.06 each 15 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, firework stands, sales booths, additional pole, etc. $45.14 each
16 BRANCH CIRCUIT AND UNIT FEE SCHEDULES
1. The following do not include permit issuing fees;2. Where appropriate either fee schedule may be used 16 Branch Circuit Fees (Alternate to Unit Fees)17
Branch circuit fees apply to new branch circuit wiring and the lighting fixtures, switches and receptacles which are supplied by these branch circuits, including their outlets 18 For 15 or 20 ampere 120 volt lighting or general use receptacles:19 First 10 branch circuits, $36.56 each20 Each additional branch circuit from 11 to 40 inclusive $30.42 each21 Each additional branch circuit over 40 $27.18 each22 For 15 or 20 ampere 208 volt to 277 volt lighting $57.59 each Exception: An individual multiwire branch circuit supplying one appliance may be counted as one circuit. 23 Unit Fees (Alternate to Branch Circuit Fees)
Carnivals, circuses or other traveling shows or exhibitions utilizing transportabletype rides, booths, displays and attractions.
For permanently installed rides, booth, displays, and attractions, use UNIT FEE SCHEDULE 18
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
24 Receptacle, Switch, Lighting, or other25 For receptacle, switch, lighting, or other outlets at which current is used or controlled except services, feeders and meters:26 First 20 $4.53 each27 Additional outlets $3.08 each For multi-outlet assemblies, each five feet or fraction therof may be considered as one outlet. 28 Lighting Fixtures29 For lighting fixtures, sockets, or other lamp holding devices:30 First 20 $4.53 each31 Additional fixtures $3.08 each32 For pole or platform mounted lighting fixtures $5.34 each33 For theatrical-type lighting fixtures or assemblies $5.34 each 34 Residential Appliances of Three Horsepower or Less35 For fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens, counter-mounted cooking tops, electric ranges, self- contained room, console, or through-wall air conditioners, space heaters, food waste grinders, dishwashers, washing machines, water heaters, clothes dryers, or other motor-operated appliances, not exceeding three (3) horsepower (HP) in rating $22.49 each
For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. 36 Other Appliances of Three Horsepower or Less37
For any appliance installed in a non-residential occupancy and not exceeding three (3) horsepower (HP), Kilowatt (KW), or kilovolt-ampere (KVA) in rating, including medical and dental devices, food, beverage, and ice cream cabinets, illuminated showcases, drinking fountains, vending machines, laundry machines, or other similar types of equipment $32.69 each
1. "Non-residential occupancy" includes but is not limited to hotels and motels but excludes apartments and single-family dwellings.2. For other types of air conditioners and other motor-driven appliances having largerelectrical ratings, see Power Apparatus. 19
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
38 Power Apparatus39
For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, with a rating in horsepower (HP) kilowatts (KW), kilovolt amperes (KVA), or kilovolt-amperes-reactive (KVAR) as follows:
1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used.2. These fees include all switches, circuit breakers, contactors, thermostats, relays andother directly related control equipment. 40 Rating over 3 and not over 10 $42.06 each41 Rating over 10 and not over 50 $97.23 each42 Rating over 50 and not over 100 $181.83 each43 Rating over 100 $300.57 each44 Busways45 For cable trays, trolley and plug-in type busways each 100 feet or fraction thereof $55.32 An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways. No fee is required for portable tools. 46 Signs, Outline Lighting, and Marquees47 For signs, outline lighting systems, or marquees supplied from one branch circuit $82.19 each
48 For additional branch circuits within the same sign, outline lighting system, or marquee $27.18 each
49 Services, Switchboards, Switchboard Sections, Motor Control Centers and Panelboards50 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less and not over 399 amperes in rating $82.19 each 20
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
51 For services, switchboards, switchboard sections, motor control centers and panelboards of 600 volts or less, and over 399 amperes to 1,000 amperes in rating $160.97 each
52 For services, switchboards, switchboard sections, motor control centers and panelboards over 600 volts, or over 1,000 amperes in rating $342.63 each 53 Miscellaneous Apparatus, Conduits and Conductors54 For electrical apparatus, conduits and conductors for which a permit is required but for which no fee in herein set forth $137.99 This fee is not applicable when a
fee is paid for one or more services,
outlets, fixtures,appliances, power apparatus, busways, signs or other equipment. 55 Other Inspections
56 For each extra inspection resulting from defective workmanship or materials $69.89 each 57 For inspection of electrical equipment for which not fee is herein set forth and for emergency inspections for the time consumed58 For each hour, or fraction thereof $231.0259 For any single hazardous location area larger than 2,000 sq. ft. or an aggregate area consisting of smaller hazardous location areas totaling over 2,000 sq. ft., a surcharge in addition to any other applicable fees $461.70 each
60 For investigation of alternate materials and methods of construction performed by the Chief Electrical Inspector:61 For the Initial filing fee $462.0262 For each hour or fraction thereof, in excess of two $231.0263 For investigation and review of test reports from local testing laboratories, or to comply with Section 83-3. 64 For one (1) to ten (10) items $533.3665 For eleven (11) to twenty (20) items $1,066.08 21
BUILDING - ELECTRICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
66 For twenty-one (21) to fifty (50) items $1,599.4467 For more than fifty (50) items $1,777.5568 For high voltage switch gears, transformers or substations $1,066.08 each69 Investigation fee for work without a permit shall be equal to the permit fee, but not less than $710.51 70 Exception: One and two family structure, wired by owner-builder $355.2571 Noncompliance Fee:72 For one and two family dwelling occupancies $213.3873 For other occupancies $427.0874 PLAN CHECK FEE 75 The fee shall be equal to seventy percent (70%) of the required electrical permit fee provided, however, the minimum fee shall be: $231.02 76 The fee for each tenant improvement plan check (installations requiring review to verify compliance with the State's Electrical Energy Conservation requirements (Title 24), when a building plan check is not required for that work, the fee shall be as follows:
77 Per 1,000 sq. ft.; provided howerver, $28.8078 the minimum plan check fee shall be $115.8379 For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors, or ommissions, per hour $231.02 per hour
22
BUILDING - MECHANICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
1 For the issuance of each permit $58.252
For the installation, alteration or relocation of each refrigeration compressor or absorption unit, and for each fuel burning furnace, heater, boiler and vented decorative appliance including vents attached thereto:
3 Up to and including 100,000 BTU $57.274 More than 100,000 BTU and up to and including 500,000 BTU $110.335 More than 500,000 BTU $276.306 For each air inlet and air outlet served by any air-conditioning system $8.90 An air-conditioned system includes heating and/or cooling7 Or when the number of air inlets and outlets are unknown, for each 1,000 square feet or fraction thereof of conditioned area $78.478 For the installation, relocation or replacement of each appliance vent- installed and not included in an appliance permit $27.18 9 For the installation or alteration of each air handling unit for air conditioning including ducts attached thereto:
This fee shall not apply to an air handling unit which is a portion fo a factory assesmbled air-conditioning appliance for which a permit is required elsewhere in this Code 10 Up to and including 2,000 CFM11 Each unit up to 10 $27.1812 Each unit over 10 $8.4213 More than 2,000 CFM and up to and including14 10,000 CFM, each $82.19 each15 More than 10,000 CFM, each $138.15 each16 For each evaporative cooler other than portable type $46.2617 For ventilation fans which serve a single register:18 Each fan up to 10 $33.8119 Each fan over 10 $11.81 23
BUILDING - MECHANICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
20 For each ventilation system which is not a portion of any air-conditioning system for which a permit is required elsewhere in this Code. $71.51 21 For the installation of each commercial kitchen hood, spray booth or product conveying duct system, including the fans and ducts attached thereto $138.15
22 For the installation of each fire damper $22.3223 For the alteration of an existing duct system for which a permit is not required elsewhere in this Code. $57.27 24 Investigation fee for work done without a required permit shall be equal to the permit fee, but not less than: $710.51 25 Exception: 1 or 2 family dwellings, when work is performed by owner- builder: $355.2526 Noncompliance fee for R-3 occupancies: $213.3827 Noncompliance fee for other occupancies: $427.0828 For investiagation of alternate materials and methods of construction29 For the initial filing fee $462.0230 For each hour or fraction thereof, in excess of two $231.0231 Note: 1) For a refrigeration system rating; one horsepower, one ton or 12,000 BTU per hour shall mean the same quantity.2) For steam boilers rated in boiler horsepower; one horsepower shall equal 50,000 BTU per hour. 32 PLAN CHECK FEE
33 The plan check fee shall be 50% of the required mechanical permit fee 50% EXCEPTION: Identical appliances of 100,000 BTU or less, installed in a single building; 34 Up to and including 10, (shall be 50% of permit fee) 50%35 For each appliance over 10, (an additional 5% of its permit fee) 5% The Mechanical Code requires plan check fees to be paid at the time of submitting plans and
specifications for:
24
BUILDING - MECHANICAL
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
36 If any of the following systems is included in the work proposed, a surcharge shall be collected for each of these systems as follows:37 (I) A commercial type I or II hood $355.2538 (ii) Garage ventilation systems $355.2539 (iii) Stairs pressurization systems $355.2540 (iv) Product conveying systems $355.2541 The minimum plan checking fee (including all surcharges) shall be $231.0242 Installations of the following individual systems:43 (I) A commercial type I or II hood $533.3644 (ii) Garage ventilation systems $533.3645 (iii) Stairs pressurization systems $533.3646 (iv) Product conveying systems $533.3647 Tenant improvement installations requiring review to verify compliance with the State's Energy Regulations, when a building permit is not required for that work, the fee shall be $57.27 per 1,000 sq. ft. of conditioned space
48 With a minimum fee of $115.8349
For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors or omissions, per hour $231.02 per hour
25
BUILDING - PLUMBING
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
1 Table No. 12 For issuing each permit $58.253 In addition:4 For each plumbing fixture or trap or set of fixtures on one trap (including drainage, vent, water piping and backflow prevention devices therefor), (hose bibbs are considered fixtures) $34.46
5 For each permanent-type dishwasher whether individually trapped or not $34.466 For future stacks or branches, each waste inlet $18.777 For each roof drain $34.468 For each drainage or sewer backwater valve $98.859 For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $34.46
10 For each swimming pool drainage trap and receptor, whether connected to a building drain or a building sewer (water supply for pool not included) $34.46 11 For each gas piping system on any one meter or alteration, extension or retest of existing gas piping system:12 Low pressure system:13 5 outlets or less $34.4614 For each additional outlet over five $8.7315 Medium or high pressure system16 Each system $141.7117 Additional fee for each outlet $8.7318 For each gas meter not under control and maintenance of the serving gas supplier $34.46 19 For each gas pressure regulator other than appliance regulators $34.4620 For each water heater and/or vent $34.4621 For repair or alteration of drainage and/or vent piping, each fixture $34.4622 For each piece of water-treating equipment $34.46 26
BUILDING - PLUMBING
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
23 For each water pressure regulator $34.4624 For potable water not covered elsewhere in fee schedule:25 1-1/2 inch and smaller $34.4626 2 inches to 3 inches $106.9427 Over 3 inches $231.0228 For replacing water piping in a building (1) each fixture, each water treating device and each piece of water-using or dispensing equipment, or (2) each branch or riser that has none of the above items connected thereto $14.24
29 For sprinkling systems on any one meter, each backflow prevention device therefor $34.46 30 For each backflow-prevention device on unprotected water supplies, pools, tanks, vats, etc. (including incidental water piping) $34.46 31 For each trap primer $34.4632 For each solar potable water-heating system, including water heater and vent $115.19
33 Investigation fee for work done without a required permit shall be equal to the permit fee, but not less than $710.51 34 Exception: 1 or 2 family dwellings, when work is performed by owner- builder $355.2535 Noncompliance fee:36 R-3 occupancies $213.3837 Other occupancies $427.0838 For investigation of alternate materials and methods of construction39 For the initial filing fee $462.0240 For each hour or fraction thereof, in excess of two $231.0241 Table No. 242 For issuing each permit $58.2543 In addition:
27
BUILDING - PLUMBING
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
44 For the connection of a house sewer to a public sewer, or for the extension of a house lateral onto a lot for future use (separate permit required for each such connection or extension) $98.85
45 For each house sewer manhole $98.8546 For each installation of a section of house sewer for future use $63.9047 For the connection of each additional building or additional work to a house sewer $63.90 48 For the connection of a house sewer to a private sewage disposal system $63.9049 For each private sewage disposal system (septic tank and seepage pits or pits and/or drainfield) $203.03 50 For each grey water system (storage tanks and disposal/irrigation fields) $203.0351 For each cesspool, overflow seepage pit, percolation test pit, swimming pool drywell, or drainfield extension or replacement $98.85 52 For disconnection, abandonment, alteration or repair of any house sewer or private sewage disposal system or part thereof $63.90 53 Plan Check Fee
54 (a) A plan checking fee as indicated shall be paid to the Chief Plumbing Inspector at the time of submitting plans and specifications for work described in this subsection. Said fee shall be equal to 40% of the required plumbing permit fee as set forth in Table I. 40% of Permit
55 If any of the following systems is included in the work proposed, a surcharge shall be collected for each of these systems as follows:56 1. Combination waste and vent system $355.2557 2. Gas system containing an earthquake actuated shut-off valve $124.0858 3. Chemical waste system $70.7059 4. Rainwater system $231.0260 The minimum plan checking fee (including all surcharges) shall be $231.02 28
BUILDING - PLUMBING
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
61 (b) For plan checking individual systems not required to be reviewed under Subsection (a) above:62 1. Combination waste and vent system $533.3663 2. Gas system containing an earthquake actuated shut-off valve $177.4764 3. Chemical waste system $106.9465 4. Rainwater system $355.2566 5. Grey water system $203.0367 (c) For additional review required by complexity of plans, or revisions of approved plans or reports, or for services beyond the first and second plan check, due to changes, errors or omissions, per hour $231.02 per hour
29
BUILDING - OTHER
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
1 Permit Issuance Fee - to be paid in addition to the fees set forth in a through j below $58.25 1a For site inspection not otherwise covered herein by a fee and which is regulated by the Building Code. $888.78 1b For inspection of any use, occupancy or change in use or occupancy Group R or U Occupancy $461.37 Occupancy groups other than R and UAffected floor area of up to 5,000 square feet $1,137.09Affected floor area of 5,001 to 10,000 square feet $1,368.44Affected floor area of 10,001 to 100,000 square feet $2,275.01Affected floor area of above 100,001 square feet $3,448.17 1c For inspection of the demolition (including sewage system termination) of a building or structure $344.90 1d For inspection of reinspection of Group A, Division 4, structures each $461.37 1e For inspection of structures or devices regulated by Chapter 66, the first inspection of the first structure or device $344.90 and, for each additional structure or device. $55.49
1f For application and investigation fee for relocation building permits as required by Chapter 34:
Floor Area: Up to 2,500 square feet $918.71Floor Area: Over 2,500 square feet $1,837.73 1g For investigation and/or permit for trailer coaches required by Chapter 69 $341.66 1h For inspection outside of normal business hours $207.08 per hour 1i For inspection for which no fee is specifically indicated $207.08 per hour1j For inspection of barriers for swimming pools, spas and hot tubs $194.30 2 For search of office records and a single copy of a permit $6.323 For each hour expended responding to public records requests which do not reasonably describe identifiable records $72.48 4 For Approval in Concept review pursuant to the 1976 Coastal Act (section 30,000 et seq. Public Resources Code) $274.85 5 For geotechnical site review and processing geology or engineering reports submitted pursuant to Sections 110, 111, 113, 1804 and Appendix Section 3309:
5a Geotechnical review of building plans and geotechnical reports i Geotechnical site review (to determine if geotechnical reports are required) $870.17 ii Geotechnical report, site, and plans review (review of initial and two addenda reports) The fee shall be 0.42% of the valuation of the proposed structure 0.42% of the valuation However, the minimum fee shall be $2,147.36
and the maximum fee shall be $13,844.13
iii Review of Geotechnical addenda beyond third review (per hour) $356.55 per hour 30
BUILDING - OTHER
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
5b Geotechnical site inspections and geotechnical report review PRIOR to building permit application i Geotechnical site review (to determine if geotechnical reports are required) $870.17 ii Geotechnical report and plan review prior to building permit application (per review) $1,724.01 5c Geotechnical review of grading plans:
1 - 1,000 cubic yards $1,421.161,001 - 10,000 cubic yards $1,899.8610,001 - 100,000 cubic yards $2,589.48100,001 - 500,000 cubic yards $3,404.49500,001 cubic yards and above $3,404.49 plus/100,000 cubic yards of additional grading $212.73
per 100,000 cubic yards of additional grading
5d Geotechnical report and grading plan review (review of initial & two addenda) 1 - 1,000 cubic yards $2,978.551,001 - 10,000 cubic yards $4,466.5210,001 - 100,000 cubic yards $5,422.59100,001 - 500,000 cubic yards $7,442.64500,001 cubic yards and above $7,442.64 plus/100,000 cubic yards of additional grading $319.50
per 100,000 cubic yards of additional grading
Review of Geotechnical addenda beyond third review (per hour) $356.55 6 For processing Coastal Engineering Reports $817.767 For determining occupant load for purposes of parking requirements pursuant to Title 22 (Zoning Ordinance) $231.02 8 Reproduction of microfilmed plans $65.52
plus additional fee for each sheet to be reproduced $6.32 per each sheet to be reproduced 9 Assignment of house numbers: $113.88
10 For additional review required by changes, addition, or revisions of approved or resubmitted plans or reports $231.02 per hour
11 For additional review required beyond the initial and second check of plans or reports $231.02 per hour12 For the issuance of a Certificate of Occupancy $213.3813 For the issuance of a Temporary Certificate of Occupancy $320.4814 For each extension of a Temporary Certificate of Occupancy $213.3815 For processing of 45-day notice pursuant to Section 103.4 $931.9716 For processing and recording a Notice of Violation pursuant to Section 103.4 $740.7617 For processing and recording a Rescission of Notice of Violation pursuant to Section 103.4 $637.22 31
BUILDING - OTHER
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. # Title
Current
Fee/Charge Unit Notes
18 For investigation of alternate materials and methods of construction.
For the initial filing fee $462.02For each hour or fraction thereof, in excess of two $231.02 19 Preliminary plan review for conceptual approval, code application/interpretation prior to submittal of permit application $462.02 (two staff-hour minimum) (Exception: no fee for 15 minutes or less) Additional fee beyond minimum $231.02 per hour or fraction thereof 20 Review of drawings and date which are sufficient to determine nature and scope of work in lieu of submittal of plans and specifications (including pedestrian protection, underground tanks, etc.) $172.77 21 Minimum plan check fee for plans to be "standardized" $317.7222 Plan Maintenance Fee 2% of building permit fee based on valuation of work $27.82 minimum $1,185.03 maximum 23 Investigation fee for work done without a required permit shall be equal to the permit fee, but not less than $710.51 Exception: One or two family dwellings, when work is performed by owner-builder $355.25 24 Noncompliance fee, when person fails to comply with written order:
Group R-3 occupancy $213.38All other occupancies $427.08 25 Request for hearing before Building Board of Appeals $907.05 Exception: a) Regarding the unsafe condition of building or structure per Sec. 102.4.1.b) Regarding the initial determination as a welded steel moment frame building in a high earthquake damaged area.c) Regarding the initial determination as a pre-April 13, 1975 Concrete Tilt-up Building. d) Regarding initial determination as an
unreinforced masonry building (URM)/potentially earthquake hazardous building. 32
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS 700 172.77 92.06 172.77 96.66 172.77 101.26 172.77 105.86 0.50 0.50 1.00 1,000 172.77 138.15 172.77 145.06 172.77 151.97 172.77 158.87 0.50 0.50 1.00 2,000 172.77 173.75 172.77 182.43 172.77 191.12 172.77 199.81 0.50 0.56 1.00 3,000 177.94 209.34 186.84 219.81 195.73 230.27 204.63 240.74 0.50 0.84 1.00 4,000 208.19 244.94 218.60 257.18 229.01 269.43 239.42 281.68 0.52 1.12 1.00 5,000 238.45 280.53 250.37 294.56 262.30 308.58 274.22 322.61 0.65 1.40 1.00 6,000 268.71 316.13 282.14 331.93 295.58 347.74 309.01 363.54 0.78 1.68 1.00 7,000 298.96 351.72 313.91 369.31 328.86 386.89 343.81 404.48 0.91 1.96 1.00 8,000 329.22 387.32 345.68 406.68 362.14 426.05 378.60 445.41 1.04 2.24 1.00 9,000 359.47 422.91 377.45 444.06 395.42 465.20 413.39 486.35 1.17 2.52 1.00 10,000 389.73 458.51 409.22 481.43 428.70 504.36 448.19 527.28 1.30 2.80 1.00 11,000 419.99 494.10 440.98 518.81 461.98 543.51 482.98 568.22 1.43 3.08 1.00 12,000 450.24 529.70 472.75 556.18 495.26 582.66 517.78 609.15 1.56 3.36 1.00 13,000 480.50 565.29 504.52 593.55 528.55 621.82 552.57 650.08 1.69 3.64 1.00 14,000 510.75 600.89 536.29 630.93 561.83 660.97 587.37 691.02 1.82 3.92 1.00 15,000 541.01 636.48 568.06 668.30 595.11 700.13 622.16 731.95 1.95 4.20 1.00 16,000 571.26 672.08 599.83 705.68 628.39 739.28 656.95 772.89 2.08 4.48 1.00 17,000 601.52 707.67 631.60 743.05 661.67 778.44 691.75 813.82 2.21 4.76 1.00 18,000 631.78 743.27 663.36 780.43 694.95 817.59 726.54 854.75 2.34 5.04 1.00 19,000 662.03 778.86 695.13 817.80 728.23 856.75 761.34 895.69 2.47 5.32 1.00 20,000 692.29 814.46 726.90 855.18 761.52 895.90 796.13 936.62 2.60 5.60 1.00 21,000 722.54 850.05 758.67 892.55 794.80 935.06 830.92 977.56 2.73 5.88 1.00 22,000 752.80 885.65 790.44 929.93 828.08 974.21 865.72 1,018.49 2.86 6.16 1.00 23,000 783.05 921.24 822.21 967.30 861.36 1,013.36 900.51 1,059.43 2.99 6.44 1.00 24,000 813.31 956.84 853.98 1,004.68 894.64 1,052.52 935.31 1,100.36 3.12 6.72 1.00 25,000 843.57 992.43 885.74 1,042.05 927.92 1,091.67 970.10 1,141.29 3.25 7.00 1.00 26,000 868.49 1,021.76 911.92 1,072.84 955.34 1,123.93 998.77 1,175.02 3.38 7.28 2.00 27,000 891.74 1,049.10 936.32 1,101.56 980.91 1,154.01 1,025.50 1,206.47 3.51 7.56 2.00 28,000 914.98 1,076.45 960.73 1,130.27 1,006.48 1,184.09 1,052.22 1,237.91 3.64 7.84 2.00 29,000 938.22 1,103.79 985.13 1,158.98 1,032.04 1,214.17 1,078.95 1,269.36 3.77 8.12 2.00 30,000 961.46 1,131.14 1,009.54 1,187.69 1,057.61 1,244.25 1,105.68 1,300.81 3.90 8.40 2.00 31,000 984.71 1,158.48 1,033.94 1,216.40 1,083.18 1,274.33 1,132.41 1,332.25 4.03 8.68 2.00 32,000 1,007.95 1,185.83 1,058.35 1,245.12 1,108.75 1,304.41 1,159.14 1,363.70 4.16 8.96 2.00 33,000 1,031.19 1,213.17 1,082.75 1,273.83 1,134.31 1,334.49 1,185.87 1,395.15 4.29 9.24 2.00 34,000 1,054.44 1,240.52 1,107.16 1,302.54 1,159.88 1,364.57 1,212.60 1,426.59 4.42 9.52 2.00 35,000 1,077.68 1,267.86 1,131.57 1,331.25 1,185.45 1,394.65 1,239.33 1,458.04 4.55 9.80 2.00 36,000 1,100.92 1,295.21 1,155.97 1,359.97 1,211.02 1,424.73 1,266.06 1,489.49 4.68 10.08 2.00 37,000 1,124.17 1,322.55 1,180.38 1,388.68 1,236.58 1,454.81 1,292.79 1,520.93 4.81 10.36 2.00 38,000 1,147.41 1,349.90 1,204.78 1,417.39 1,262.15 1,484.88 1,319.52 1,552.38 4.94 10.64 2.00 39,000 1,170.65 1,377.24 1,229.19 1,446.10 1,287.72 1,514.96 1,346.25 1,583.83 5.07 10.92 2.00 GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 33
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 40,000 1,193.90 1,404.59 1,253.59 1,474.81 1,313.29 1,545.04 1,372.98 1,615.27 5.20 11.20 2.00 41,000 1,217.14 1,431.93 1,278.00 1,503.53 1,338.85 1,575.12 1,399.71 1,646.72 5.33 11.48 2.00 42,000 1,240.38 1,459.28 1,302.40 1,532.24 1,364.42 1,605.20 1,426.44 1,678.17 5.46 11.76 2.00 43,000 1,263.63 1,486.62 1,326.81 1,560.95 1,389.99 1,635.28 1,453.17 1,709.61 5.59 12.04 2.00 44,000 1,286.87 1,513.97 1,351.21 1,589.66 1,415.56 1,665.36 1,479.90 1,741.06 5.72 12.32 2.00 45,000 1,310.11 1,541.31 1,375.62 1,618.38 1,441.12 1,695.44 1,506.63 1,772.51 5.85 12.60 2.00 46,000 1,333.36 1,568.66 1,400.02 1,647.09 1,466.69 1,725.52 1,533.36 1,803.95 5.98 12.88 2.00 47,000 1,356.60 1,596.00 1,424.43 1,675.80 1,492.26 1,755.60 1,560.09 1,835.40 6.11 13.16 2.00 48,000 1,379.84 1,623.35 1,448.84 1,704.51 1,517.83 1,785.68 1,586.82 1,866.85 6.24 13.44 2.00 49,000 1,403.09 1,650.69 1,473.24 1,733.22 1,543.40 1,815.76 1,613.55 1,898.29 6.37 13.72 2.00 50,000 1,426.33 1,678.04 1,497.65 1,761.94 1,568.96 1,845.84 1,640.28 1,929.74 6.50 14.00 2.00 51,000 1,453.16 1,709.60 1,525.81 1,795.07 1,598.47 1,880.55 1,671.13 1,966.03 6.63 14.28 3.00 52,000 1,470.75 1,730.30 1,544.29 1,816.81 1,617.83 1,903.32 1,691.36 1,989.84 6.76 14.56 3.00 53,000 1,488.35 1,751.00 1,562.76 1,838.54 1,637.18 1,926.09 1,711.60 2,013.64 6.89 14.84 3.00 54,000 1,505.94 1,771.70 1,581.24 1,860.28 1,656.53 1,948.86 1,731.83 2,037.45 7.02 15.12 3.00 55,000 1,523.54 1,792.40 1,599.71 1,882.01 1,675.89 1,971.63 1,752.07 2,061.25 7.15 15.40 3.00 56,000 1,541.13 1,813.10 1,618.19 1,903.75 1,695.24 1,994.40 1,772.30 2,085.06 7.28 15.68 3.00 57,000 1,558.73 1,833.80 1,636.66 1,925.48 1,714.60 2,017.17 1,792.53 2,108.86 7.41 15.96 3.00 58,000 1,576.32 1,854.50 1,655.14 1,947.22 1,733.95 2,039.94 1,812.77 2,132.67 7.54 16.24 3.00 59,000 1,593.92 1,875.20 1,673.61 1,968.95 1,753.31 2,062.71 1,833.00 2,156.47 7.67 16.52 3.00 60,000 1,611.51 1,895.90 1,692.09 1,990.69 1,772.66 2,085.48 1,853.24 2,180.28 7.80 16.80 3.00 61,000 1,629.11 1,916.60 1,710.56 2,012.42 1,792.02 2,108.25 1,873.47 2,204.08 7.93 17.08 3.00 62,000 1,646.70 1,937.30 1,729.04 2,034.16 1,811.37 2,131.02 1,893.71 2,227.89 8.06 17.36 3.00 63,000 1,664.30 1,958.00 1,747.51 2,055.89 1,830.73 2,153.79 1,913.94 2,251.69 8.19 17.64 3.00 64,000 1,681.89 1,978.70 1,765.99 2,077.63 1,850.08 2,176.56 1,934.17 2,275.50 8.32 17.92 3.00 65,000 1,699.49 1,999.40 1,784.46 2,099.36 1,869.43 2,199.33 1,954.41 2,299.30 8.45 18.20 3.00 66,000 1,717.08 2,020.10 1,802.93 2,121.10 1,888.79 2,222.10 1,974.64 2,323.11 8.58 18.48 3.00 67,000 1,734.68 2,040.80 1,821.41 2,142.83 1,908.14 2,244.87 1,994.88 2,346.91 8.71 18.76 3.00 68,000 1,752.27 2,061.50 1,839.88 2,164.57 1,927.50 2,267.64 2,015.11 2,370.72 8.84 19.04 3.00 69,000 1,769.87 2,082.20 1,858.36 2,186.30 1,946.85 2,290.41 2,035.35 2,394.52 8.97 19.32 3.00 70,000 1,787.46 2,102.90 1,876.83 2,208.04 1,966.21 2,313.18 2,055.58 2,418.33 9.10 19.60 3.00 71,000 1,805.06 2,123.60 1,895.31 2,229.77 1,985.56 2,335.95 2,075.81 2,442.13 9.23 19.88 3.00 72,000 1,822.65 2,144.30 1,913.78 2,251.51 2,004.92 2,358.72 2,096.05 2,465.94 9.36 20.16 3.00 73,000 1,840.25 2,165.00 1,932.26 2,273.24 2,024.27 2,381.49 2,116.28 2,489.74 9.49 20.44 3.00 74,000 1,857.84 2,185.70 1,950.73 2,294.98 2,043.62 2,404.26 2,136.52 2,513.55 9.62 20.72 3.00 75,000 1,875.44 2,206.40 1,969.21 2,316.71 2,062.98 2,427.03 2,156.75 2,537.35 9.75 21.00 3.00 76,000 1,893.03 2,227.10 1,987.68 2,338.45 2,082.33 2,449.80 2,176.99 2,561.16 9.88 21.28 4.00 77,000 1,910.63 2,247.80 2,006.16 2,360.18 2,101.69 2,472.57 2,197.22 2,584.96 10.01 21.56 4.00 78,000 1,928.22 2,268.50 2,024.63 2,381.92 2,121.04 2,495.34 2,217.45 2,608.77 10.14 21.84 4.00 79,000 1,945.82 2,289.20 2,043.11 2,403.65 2,140.40 2,518.11 2,237.69 2,632.57 10.27 22.12 4.00 34
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 80,000 1,963.41 2,309.90 2,061.58 2,425.39 2,159.75 2,540.88 2,257.92 2,656.38 10.40 22.40 4.00 81,000 1,981.01 2,330.60 2,080.06 2,447.12 2,179.11 2,563.65 2,278.16 2,680.18 10.53 22.68 4.00 82,000 1,998.60 2,351.30 2,098.53 2,468.86 2,198.46 2,586.42 2,298.39 2,703.99 10.66 22.96 4.00 83,000 2,016.20 2,372.00 2,117.01 2,490.59 2,217.82 2,609.19 2,318.63 2,727.79 10.79 23.24 4.00 84,000 2,033.79 2,392.70 2,135.48 2,512.33 2,237.17 2,631.96 2,338.86 2,751.60 10.92 23.52 4.00 85,000 2,051.39 2,413.40 2,153.96 2,534.06 2,256.52 2,654.73 2,359.09 2,775.40 11.05 23.80 4.00 86,000 2,068.98 2,434.10 2,172.43 2,555.80 2,275.88 2,677.50 2,379.33 2,799.21 11.18 24.08 4.00 87,000 2,086.58 2,454.80 2,190.90 2,577.53 2,295.23 2,700.27 2,399.56 2,823.01 11.31 24.36 4.00 88,000 2,104.17 2,475.50 2,209.38 2,599.27 2,314.59 2,723.04 2,419.80 2,846.82 11.44 24.64 4.00 89,000 2,121.77 2,496.20 2,227.85 2,621.00 2,333.94 2,745.81 2,440.03 2,870.62 11.57 24.92 4.00 90,000 2,139.36 2,516.90 2,246.33 2,642.74 2,353.30 2,768.58 2,460.26 2,894.43 11.70 25.20 4.00 91,000 2,156.96 2,537.60 2,264.80 2,664.47 2,372.65 2,791.35 2,480.50 2,918.23 11.83 25.48 4.00 92,000 2,174.55 2,558.30 2,283.28 2,686.21 2,392.01 2,814.12 2,500.73 2,942.04 11.96 25.76 4.00 93,000 2,192.15 2,579.00 2,301.75 2,707.94 2,411.36 2,836.89 2,520.97 2,965.84 12.09 26.04 4.00 94,000 2,209.74 2,599.70 2,320.23 2,729.68 2,430.71 2,859.66 2,541.20 2,989.65 12.22 26.32 4.00 95,000 2,227.34 2,620.40 2,338.70 2,751.41 2,450.07 2,882.43 2,561.44 3,013.45 12.35 26.60 4.00 96,000 2,244.93 2,641.10 2,357.18 2,773.15 2,469.42 2,905.20 2,581.67 3,037.26 12.48 26.88 4.00 97,000 2,262.53 2,661.80 2,375.65 2,794.88 2,488.78 2,927.97 2,601.90 3,061.06 12.61 27.16 4.00 98,000 2,280.12 2,682.50 2,394.13 2,816.62 2,508.13 2,950.74 2,622.14 3,084.87 12.74 27.44 4.00 99,000 2,297.72 2,703.20 2,412.60 2,838.35 2,527.49 2,973.51 2,642.37 3,108.67 12.87 27.72 4.00 100,000 2,315.31 2,723.90 2,431.08 2,860.09 2,546.84 2,996.28 2,662.61 3,132.48 13.00 28.00 4.00 101,000 2,323.31 2,733.30 2,439.47 2,869.97 2,555.64 3,006.63 2,671.80 3,143.30 13.13 28.28 5.00 102,000 2,335.26 2,747.37 2,452.03 2,884.74 2,568.79 3,022.11 2,685.55 3,159.48 13.26 28.56 5.00 103,000 2,347.22 2,761.44 2,464.59 2,899.51 2,581.95 3,037.58 2,699.31 3,175.66 13.39 28.84 5.00 104,000 2,359.18 2,775.51 2,477.14 2,914.29 2,595.10 3,053.06 2,713.06 3,191.84 13.52 29.12 5.00 105,000 2,371.14 2,789.58 2,489.70 2,929.06 2,608.26 3,068.54 2,726.81 3,208.02 13.65 29.40 5.00 106,000 2,383.10 2,803.65 2,502.26 2,943.83 2,621.41 3,084.02 2,740.57 3,224.20 13.78 29.68 5.00 107,000 2,395.06 2,817.72 2,514.82 2,958.61 2,634.57 3,099.49 2,754.32 3,240.38 13.91 29.96 5.00 108,000 2,407.02 2,831.79 2,527.37 2,973.38 2,647.72 3,114.97 2,768.07 3,256.56 14.04 30.24 5.00 109,000 2,418.98 2,845.86 2,539.93 2,988.15 2,660.88 3,130.45 2,781.83 3,272.74 14.17 30.52 5.00 110,000 2,430.94 2,859.93 2,552.49 3,002.93 2,674.03 3,145.92 2,795.58 3,288.92 14.30 30.80 5.00 111,000 2,442.90 2,874.00 2,565.05 3,017.70 2,687.19 3,161.40 2,809.34 3,305.10 14.43 31.08 5.00 112,000 2,454.86 2,888.07 2,577.60 3,032.47 2,700.35 3,176.88 2,823.09 3,321.28 14.56 31.36 5.00 113,000 2,466.82 2,902.14 2,590.16 3,047.25 2,713.50 3,192.35 2,836.84 3,337.46 14.69 31.64 5.00 114,000 2,478.78 2,916.21 2,602.72 3,062.02 2,726.66 3,207.83 2,850.60 3,353.64 14.82 31.92 5.00 115,000 2,490.74 2,930.28 2,615.27 3,076.79 2,739.81 3,223.31 2,864.35 3,369.82 14.95 32.20 5.00 116,000 2,502.70 2,944.35 2,627.83 3,091.57 2,752.97 3,238.79 2,878.10 3,386.00 15.08 32.48 5.00 117,000 2,514.66 2,958.42 2,640.39 3,106.34 2,766.12 3,254.26 2,891.86 3,402.18 15.21 32.76 5.00 118,000 2,526.62 2,972.49 2,652.95 3,121.11 2,779.28 3,269.74 2,905.61 3,418.36 15.34 33.04 5.00 119,000 2,538.58 2,986.56 2,665.50 3,135.89 2,792.43 3,285.22 2,919.36 3,434.54 15.47 33.32 5.00 35
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 120,000 2,550.54 3,000.63 2,678.06 3,150.66 2,805.59 3,300.69 2,933.12 3,450.72 15.60 33.60 5.00 121,000 2,562.50 3,014.70 2,690.62 3,165.44 2,818.74 3,316.17 2,946.87 3,466.91 15.73 33.88 5.00 122,000 2,574.45 3,028.77 2,703.18 3,180.21 2,831.90 3,331.65 2,960.62 3,483.09 15.86 34.16 5.00 123,000 2,586.41 3,042.84 2,715.73 3,194.98 2,845.06 3,347.12 2,974.38 3,499.27 15.99 34.44 5.00 124,000 2,598.37 3,056.91 2,728.29 3,209.76 2,858.21 3,362.60 2,988.13 3,515.45 16.12 34.72 5.00 125,000 2,610.33 3,070.98 2,740.85 3,224.53 2,871.37 3,378.08 3,001.88 3,531.63 16.25 35.00 5.00 126,000 2,622.29 3,085.05 2,753.41 3,239.30 2,884.52 3,393.56 3,015.64 3,547.81 16.38 35.28 6.00 127,000 2,634.25 3,099.12 2,765.96 3,254.08 2,897.68 3,409.03 3,029.39 3,563.99 16.51 35.56 6.00 128,000 2,646.21 3,113.19 2,778.52 3,268.85 2,910.83 3,424.51 3,043.14 3,580.17 16.64 35.84 6.00 129,000 2,658.17 3,127.26 2,791.08 3,283.62 2,923.99 3,439.99 3,056.90 3,596.35 16.77 36.12 6.00 130,000 2,670.13 3,141.33 2,803.64 3,298.40 2,937.14 3,455.46 3,070.65 3,612.53 16.90 36.40 6.00 131,000 2,682.09 3,155.40 2,816.19 3,313.17 2,950.30 3,470.94 3,084.40 3,628.71 17.03 36.68 6.00 132,000 2,694.05 3,169.47 2,828.75 3,327.94 2,963.45 3,486.42 3,098.16 3,644.89 17.16 36.96 6.00 133,000 2,706.01 3,183.54 2,841.31 3,342.72 2,976.61 3,501.89 3,111.91 3,661.07 17.29 37.24 6.00 134,000 2,717.97 3,197.61 2,853.87 3,357.49 2,989.77 3,517.37 3,125.66 3,677.25 17.42 37.52 6.00 135,000 2,729.93 3,211.68 2,866.42 3,372.26 3,002.92 3,532.85 3,139.42 3,693.43 17.55 37.80 6.00 136,000 2,741.89 3,225.75 2,878.98 3,387.04 3,016.08 3,548.33 3,153.17 3,709.61 17.68 38.08 6.00 137,000 2,753.85 3,239.82 2,891.54 3,401.81 3,029.23 3,563.80 3,166.92 3,725.79 17.81 38.36 6.00 138,000 2,765.81 3,253.89 2,904.10 3,416.58 3,042.39 3,579.28 3,180.68 3,741.97 17.94 38.64 6.00 139,000 2,777.77 3,267.96 2,916.65 3,431.36 3,055.54 3,594.76 3,194.43 3,758.15 18.07 38.92 6.00 140,000 2,789.73 3,282.03 2,929.21 3,446.13 3,068.70 3,610.23 3,208.18 3,774.33 18.20 39.20 6.00 141,000 2,801.69 3,296.10 2,941.77 3,460.91 3,081.85 3,625.71 3,221.94 3,790.52 18.33 39.48 6.00 142,000 2,813.64 3,310.17 2,954.33 3,475.68 3,095.01 3,641.19 3,235.69 3,806.70 18.46 39.76 6.00 143,000 2,825.60 3,324.24 2,966.88 3,490.45 3,108.16 3,656.66 3,249.44 3,822.88 18.59 40.04 6.00 144,000 2,837.56 3,338.31 2,979.44 3,505.23 3,121.32 3,672.14 3,263.20 3,839.06 18.72 40.32 6.00 145,000 2,849.52 3,352.38 2,992.00 3,520.00 3,134.48 3,687.62 3,276.95 3,855.24 18.85 40.60 6.00 146,000 2,861.48 3,366.45 3,004.56 3,534.77 3,147.63 3,703.10 3,290.70 3,871.42 18.98 40.88 6.00 147,000 2,873.44 3,380.52 3,017.11 3,549.55 3,160.79 3,718.57 3,304.46 3,887.60 19.11 41.16 6.00 148,000 2,885.40 3,394.59 3,029.67 3,564.32 3,173.94 3,734.05 3,318.21 3,903.78 19.24 41.44 6.00 149,000 2,897.36 3,408.66 3,042.23 3,579.09 3,187.10 3,749.53 3,331.97 3,919.96 19.37 41.72 6.00 150,000 2,909.32 3,422.73 3,054.79 3,593.87 3,200.25 3,765.00 3,345.72 3,936.14 19.50 42.00 6.00 151,000 2,921.28 3,436.80 3,067.34 3,608.64 3,213.41 3,780.48 3,359.47 3,952.32 19.63 42.28 7.00 152,000 2,933.24 3,450.87 3,079.90 3,623.41 3,226.56 3,795.96 3,373.23 3,968.50 19.76 42.56 7.00 153,000 2,945.20 3,464.94 3,092.46 3,638.19 3,239.72 3,811.43 3,386.98 3,984.68 19.89 42.84 7.00 154,000 2,957.16 3,479.01 3,105.02 3,652.96 3,252.87 3,826.91 3,400.73 4,000.86 20.02 43.12 7.00 155,000 2,969.12 3,493.08 3,117.57 3,667.73 3,266.03 3,842.39 3,414.49 4,017.04 20.15 43.40 7.00 156,000 2,981.08 3,507.15 3,130.13 3,682.51 3,279.19 3,857.87 3,428.24 4,033.22 20.28 43.68 7.00 157,000 2,993.04 3,521.22 3,142.69 3,697.28 3,292.34 3,873.34 3,441.99 4,049.40 20.41 43.96 7.00 158,000 3,005.00 3,535.29 3,155.25 3,712.05 3,305.50 3,888.82 3,455.75 4,065.58 20.54 44.24 7.00 159,000 3,016.96 3,549.36 3,167.80 3,726.83 3,318.65 3,904.30 3,469.50 4,081.76 20.67 44.52 7.00 36
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 160,000 3,028.92 3,563.43 3,180.36 3,741.60 3,331.81 3,919.77 3,483.25 4,097.94 20.80 44.80 7.00 161,000 3,040.88 3,577.50 3,192.92 3,756.38 3,344.96 3,935.25 3,497.01 4,114.13 20.93 45.08 7.00 162,000 3,052.83 3,591.57 3,205.48 3,771.15 3,358.12 3,950.73 3,510.76 4,130.31 21.06 45.36 7.00 163,000 3,064.79 3,605.64 3,218.03 3,785.92 3,371.27 3,966.20 3,524.51 4,146.49 21.19 45.64 7.00 164,000 3,076.75 3,619.71 3,230.59 3,800.70 3,384.43 3,981.68 3,538.27 4,162.67 21.32 45.92 7.00 165,000 3,088.71 3,633.78 3,243.15 3,815.47 3,397.58 3,997.16 3,552.02 4,178.85 21.45 46.20 7.00 166,000 3,100.67 3,647.85 3,255.71 3,830.24 3,410.74 4,012.64 3,565.77 4,195.03 21.58 46.48 7.00 167,000 3,112.63 3,661.92 3,268.26 3,845.02 3,423.90 4,028.11 3,579.53 4,211.21 21.71 46.76 7.00 168,000 3,124.59 3,675.99 3,280.82 3,859.79 3,437.05 4,043.59 3,593.28 4,227.39 21.84 47.04 7.00 169,000 3,136.55 3,690.06 3,293.38 3,874.56 3,450.21 4,059.07 3,607.03 4,243.57 21.97 47.32 7.00 170,000 3,148.51 3,704.13 3,305.94 3,889.34 3,463.36 4,074.54 3,620.79 4,259.75 22.10 47.60 7.00 171,000 3,160.47 3,718.20 3,318.49 3,904.11 3,476.52 4,090.02 3,634.54 4,275.93 22.23 47.88 7.00 172,000 3,172.43 3,732.27 3,331.05 3,918.88 3,489.67 4,105.50 3,648.29 4,292.11 22.36 48.16 7.00 173,000 3,184.39 3,746.34 3,343.61 3,933.66 3,502.83 4,120.97 3,662.05 4,308.29 22.49 48.44 7.00 174,000 3,196.35 3,760.41 3,356.17 3,948.43 3,515.98 4,136.45 3,675.80 4,324.47 22.62 48.72 7.00 175,000 3,208.31 3,774.48 3,368.72 3,963.20 3,529.14 4,151.93 3,689.55 4,340.65 22.75 49.00 7.00 176,000 3,220.27 3,788.55 3,381.28 3,977.98 3,542.29 4,167.41 3,703.31 4,356.83 22.88 49.28 8.00 177,000 3,232.23 3,802.62 3,393.84 3,992.75 3,555.45 4,182.88 3,717.06 4,373.01 23.01 49.56 8.00 178,000 3,244.19 3,816.69 3,406.40 4,007.52 3,568.61 4,198.36 3,730.81 4,389.19 23.14 49.84 8.00 179,000 3,256.15 3,830.76 3,418.95 4,022.30 3,581.76 4,213.84 3,744.57 4,405.37 23.27 50.12 8.00 180,000 3,268.11 3,844.83 3,431.51 4,037.07 3,594.92 4,229.31 3,758.32 4,421.55 23.40 50.40 8.00 181,000 3,280.07 3,858.90 3,444.07 4,051.85 3,608.07 4,244.79 3,772.07 4,437.74 23.53 50.68 8.00 182,000 3,292.02 3,872.97 3,456.63 4,066.62 3,621.23 4,260.27 3,785.83 4,453.92 23.66 50.96 8.00 183,000 3,303.98 3,887.04 3,469.18 4,081.39 3,634.38 4,275.74 3,799.58 4,470.10 23.79 51.24 8.00 184,000 3,315.94 3,901.11 3,481.74 4,096.17 3,647.54 4,291.22 3,813.34 4,486.28 23.92 51.52 8.00 185,000 3,327.90 3,915.18 3,494.30 4,110.94 3,660.69 4,306.70 3,827.09 4,502.46 24.05 51.80 8.00 186,000 3,339.86 3,929.25 3,506.86 4,125.71 3,673.85 4,322.18 3,840.84 4,518.64 24.18 52.08 8.00 187,000 3,351.82 3,943.32 3,519.41 4,140.49 3,687.00 4,337.65 3,854.60 4,534.82 24.31 52.36 8.00 188,000 3,363.78 3,957.39 3,531.97 4,155.26 3,700.16 4,353.13 3,868.35 4,551.00 24.44 52.64 8.00 189,000 3,375.74 3,971.46 3,544.53 4,170.03 3,713.32 4,368.61 3,882.10 4,567.18 24.57 52.92 8.00 190,000 3,387.70 3,985.53 3,557.09 4,184.81 3,726.47 4,384.08 3,895.86 4,583.36 24.70 53.20 8.00 191,000 3,399.66 3,999.60 3,569.64 4,199.58 3,739.63 4,399.56 3,909.61 4,599.54 24.83 53.48 8.00 192,000 3,411.62 4,013.67 3,582.20 4,214.35 3,752.78 4,415.04 3,923.36 4,615.72 24.96 53.76 8.00 193,000 3,423.58 4,027.74 3,594.76 4,229.13 3,765.94 4,430.51 3,937.12 4,631.90 25.09 54.04 8.00 194,000 3,435.54 4,041.81 3,607.32 4,243.90 3,779.09 4,445.99 3,950.87 4,648.08 25.22 54.32 8.00 195,000 3,447.50 4,055.88 3,619.87 4,258.67 3,792.25 4,461.47 3,964.62 4,664.26 25.35 54.60 8.00 196,000 3,459.46 4,069.95 3,632.43 4,273.45 3,805.40 4,476.95 3,978.38 4,680.44 25.48 54.88 8.00 197,000 3,471.42 4,084.02 3,644.99 4,288.22 3,818.56 4,492.42 3,992.13 4,696.62 25.61 55.16 8.00 198,000 3,483.38 4,098.09 3,657.55 4,302.99 3,831.71 4,507.90 4,005.88 4,712.80 25.74 55.44 8.00 199,000 3,495.34 4,112.16 3,670.10 4,317.77 3,844.87 4,523.38 4,019.64 4,728.98 25.87 55.72 8.00 37
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 200,000 3,507.30 4,126.23 3,682.66 4,332.54 3,858.03 4,538.85 4,033.39 4,745.16 26.00 56.00 8.00 201,000 3,519.26 4,140.30 3,695.22 4,347.32 3,871.18 4,554.33 4,047.14 4,761.35 26.13 56.28 9.00 202,000 3,531.21 4,154.37 3,707.78 4,362.09 3,884.34 4,569.81 4,060.90 4,777.53 26.26 56.56 9.00 203,000 3,543.17 4,168.44 3,720.33 4,376.86 3,897.49 4,585.28 4,074.65 4,793.71 26.39 56.84 9.00 204,000 3,555.13 4,182.51 3,732.89 4,391.64 3,910.65 4,600.76 4,088.40 4,809.89 26.52 57.12 9.00 205,000 3,567.09 4,196.58 3,745.45 4,406.41 3,923.80 4,616.24 4,102.16 4,826.07 26.65 57.40 9.00 206,000 3,579.05 4,210.65 3,758.01 4,421.18 3,936.96 4,631.72 4,115.91 4,842.25 26.78 57.68 9.00 207,000 3,591.01 4,224.72 3,770.56 4,435.96 3,950.11 4,647.19 4,129.66 4,858.43 26.91 57.96 9.00 208,000 3,602.97 4,238.79 3,783.12 4,450.73 3,963.27 4,662.67 4,143.42 4,874.61 27.04 58.24 9.00 209,000 3,614.93 4,252.86 3,795.68 4,465.50 3,976.42 4,678.15 4,157.17 4,890.79 27.17 58.52 9.00 210,000 3,626.89 4,266.93 3,808.24 4,480.28 3,989.58 4,693.62 4,170.92 4,906.97 27.30 58.80 9.00 211,000 3,638.85 4,281.00 3,820.79 4,495.05 4,002.74 4,709.10 4,184.68 4,923.15 27.43 59.08 9.00 212,000 3,650.81 4,295.07 3,833.35 4,509.82 4,015.89 4,724.58 4,198.43 4,939.33 27.56 59.36 9.00 213,000 3,662.77 4,309.14 3,845.91 4,524.60 4,029.05 4,740.05 4,212.18 4,955.51 27.69 59.64 9.00 214,000 3,674.73 4,323.21 3,858.46 4,539.37 4,042.20 4,755.53 4,225.94 4,971.69 27.82 59.92 9.00 215,000 3,686.69 4,337.28 3,871.02 4,554.14 4,055.36 4,771.01 4,239.69 4,987.87 27.95 60.20 9.00 216,000 3,698.65 4,351.35 3,883.58 4,568.92 4,068.51 4,786.49 4,253.44 5,004.05 28.08 60.48 9.00 217,000 3,710.61 4,365.42 3,896.14 4,583.69 4,081.67 4,801.96 4,267.20 5,020.23 28.21 60.76 9.00 218,000 3,722.57 4,379.49 3,908.69 4,598.46 4,094.82 4,817.44 4,280.95 5,036.41 28.34 61.04 9.00 219,000 3,734.53 4,393.56 3,921.25 4,613.24 4,107.98 4,832.92 4,294.70 5,052.59 28.47 61.32 9.00 220,000 3,746.49 4,407.63 3,933.81 4,628.01 4,121.13 4,848.39 4,308.46 5,068.77 28.60 61.60 9.00 221,000 3,758.45 4,421.70 3,946.37 4,642.79 4,134.29 4,863.87 4,322.21 5,084.96 28.73 61.88 9.00 222,000 3,770.40 4,435.77 3,958.92 4,657.56 4,147.44 4,879.35 4,335.97 5,101.14 28.86 62.16 9.00 223,000 3,782.36 4,449.84 3,971.48 4,672.33 4,160.60 4,894.82 4,349.72 5,117.32 28.99 62.44 9.00 224,000 3,794.32 4,463.91 3,984.04 4,687.11 4,173.76 4,910.30 4,363.47 5,133.50 29.12 62.72 9.00 225,000 3,806.28 4,477.98 3,996.60 4,701.88 4,186.91 4,925.78 4,377.23 5,149.68 29.25 63.00 9.00 226,000 3,818.24 4,492.05 4,009.15 4,716.65 4,200.07 4,941.26 4,390.98 5,165.86 29.38 63.28 10.00 227,000 3,830.20 4,506.12 4,021.71 4,731.43 4,213.22 4,956.73 4,404.73 5,182.04 29.51 63.56 10.00 228,000 3,842.16 4,520.19 4,034.27 4,746.20 4,226.38 4,972.21 4,418.49 5,198.22 29.64 63.84 10.00 229,000 3,854.12 4,534.26 4,046.83 4,760.97 4,239.53 4,987.69 4,432.24 5,214.40 29.77 64.12 10.00 230,000 3,866.08 4,548.33 4,059.38 4,775.75 4,252.69 5,003.16 4,445.99 5,230.58 29.90 64.40 10.00 231,000 3,878.04 4,562.40 4,071.94 4,790.52 4,265.84 5,018.64 4,459.75 5,246.76 30.03 64.68 10.00 232,000 3,890.00 4,576.47 4,084.50 4,805.29 4,279.00 5,034.12 4,473.50 5,262.94 30.16 64.96 10.00 233,000 3,901.96 4,590.54 4,097.06 4,820.07 4,292.15 5,049.59 4,487.25 5,279.12 30.29 65.24 10.00 234,000 3,913.92 4,604.61 4,109.61 4,834.84 4,305.31 5,065.07 4,501.01 5,295.30 30.42 65.52 10.00 235,000 3,925.88 4,618.68 4,122.17 4,849.61 4,318.47 5,080.55 4,514.76 5,311.48 30.55 65.80 10.00 236,000 3,937.84 4,632.75 4,134.73 4,864.39 4,331.62 5,096.03 4,528.51 5,327.66 30.68 66.08 10.00 237,000 3,949.80 4,646.82 4,147.29 4,879.16 4,344.78 5,111.50 4,542.27 5,343.84 30.81 66.36 10.00 238,000 3,961.76 4,660.89 4,159.84 4,893.93 4,357.93 5,126.98 4,556.02 5,360.02 30.94 66.64 10.00 239,000 3,973.72 4,674.96 4,172.40 4,908.71 4,371.09 5,142.46 4,569.77 5,376.20 31.07 66.92 10.00 38
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 240,000 3,985.68 4,689.03 4,184.96 4,923.48 4,384.24 5,157.93 4,583.53 5,392.38 31.20 67.20 10.00 241,000 3,997.64 4,703.10 4,197.52 4,938.26 4,397.40 5,173.41 4,597.28 5,408.57 31.33 67.48 10.00 242,000 4,009.59 4,717.17 4,210.07 4,953.03 4,410.55 5,188.89 4,611.03 5,424.75 31.46 67.76 10.00 243,000 4,021.55 4,731.24 4,222.63 4,967.80 4,423.71 5,204.36 4,624.79 5,440.93 31.59 68.04 10.00 244,000 4,033.51 4,745.31 4,235.19 4,982.58 4,436.86 5,219.84 4,638.54 5,457.11 31.72 68.32 10.00 245,000 4,045.47 4,759.38 4,247.75 4,997.35 4,450.02 5,235.32 4,652.29 5,473.29 31.85 68.60 10.00 246,000 4,057.43 4,773.45 4,260.30 5,012.12 4,463.18 5,250.80 4,666.05 5,489.47 31.98 68.88 10.00 247,000 4,069.39 4,787.52 4,272.86 5,026.90 4,476.33 5,266.27 4,679.80 5,505.65 32.11 69.16 10.00 248,000 4,081.35 4,801.59 4,285.42 5,041.67 4,489.49 5,281.75 4,693.55 5,521.83 32.24 69.44 10.00 249,000 4,093.31 4,815.66 4,297.98 5,056.44 4,502.64 5,297.23 4,707.31 5,538.01 32.37 69.72 10.00 250,000 4,105.27 4,829.73 4,310.53 5,071.22 4,515.80 5,312.70 4,721.06 5,554.19 32.50 70.00 10.00 251,000 4,117.23 4,843.80 4,323.09 5,085.99 4,528.95 5,328.18 4,734.81 5,570.37 32.63 70.28 11.00 252,000 4,129.19 4,857.87 4,335.65 5,100.76 4,542.11 5,343.66 4,748.57 5,586.55 32.76 70.56 11.00 253,000 4,141.15 4,871.94 4,348.21 5,115.54 4,555.26 5,359.13 4,762.32 5,602.73 32.89 70.84 11.00 254,000 4,153.11 4,886.01 4,360.76 5,130.31 4,568.42 5,374.61 4,776.07 5,618.91 33.02 71.12 11.00 255,000 4,165.07 4,900.08 4,373.32 5,145.08 4,581.57 5,390.09 4,789.83 5,635.09 33.15 71.40 11.00 256,000 4,177.03 4,914.15 4,385.88 5,159.86 4,594.73 5,405.57 4,803.58 5,651.27 33.28 71.68 11.00 257,000 4,188.99 4,928.22 4,398.44 5,174.63 4,607.89 5,421.04 4,817.34 5,667.45 33.41 71.96 11.00 258,000 4,200.95 4,942.29 4,410.99 5,189.40 4,621.04 5,436.52 4,831.09 5,683.63 33.54 72.24 11.00 259,000 4,212.91 4,956.36 4,423.55 5,204.18 4,634.20 5,452.00 4,844.84 5,699.81 33.67 72.52 11.00 260,000 4,224.87 4,970.43 4,436.11 5,218.95 4,647.35 5,467.47 4,858.60 5,715.99 33.80 72.80 11.00 261,000 4,236.83 4,984.50 4,448.67 5,233.73 4,660.51 5,482.95 4,872.35 5,732.18 33.93 73.08 11.00 262,000 4,248.78 4,998.57 4,461.22 5,248.50 4,673.66 5,498.43 4,886.10 5,748.36 34.06 73.36 11.00 263,000 4,260.74 5,012.64 4,473.78 5,263.27 4,686.82 5,513.90 4,899.86 5,764.54 34.19 73.64 11.00 264,000 4,272.70 5,026.71 4,486.34 5,278.05 4,699.97 5,529.38 4,913.61 5,780.72 34.32 73.92 11.00 265,000 4,284.66 5,040.78 4,498.90 5,292.82 4,713.13 5,544.86 4,927.36 5,796.90 34.45 74.20 11.00 266,000 4,296.62 5,054.85 4,511.45 5,307.59 4,726.28 5,560.34 4,941.12 5,813.08 34.58 74.48 11.00 267,000 4,308.58 5,068.92 4,524.01 5,322.37 4,739.44 5,575.81 4,954.87 5,829.26 34.71 74.76 11.00 268,000 4,320.54 5,082.99 4,536.57 5,337.14 4,752.60 5,591.29 4,968.62 5,845.44 34.84 75.04 11.00 269,000 4,332.50 5,097.06 4,549.13 5,351.91 4,765.75 5,606.77 4,982.38 5,861.62 34.97 75.32 11.00 270,000 4,344.46 5,111.13 4,561.68 5,366.69 4,778.91 5,622.24 4,996.13 5,877.80 35.10 75.60 11.00 271,000 4,356.42 5,125.20 4,574.24 5,381.46 4,792.06 5,637.72 5,009.88 5,893.98 35.23 75.88 11.00 272,000 4,368.38 5,139.27 4,586.80 5,396.23 4,805.22 5,653.20 5,023.64 5,910.16 35.36 76.16 11.00 273,000 4,380.34 5,153.34 4,599.36 5,411.01 4,818.37 5,668.67 5,037.39 5,926.34 35.49 76.44 11.00 274,000 4,392.30 5,167.41 4,611.91 5,425.78 4,831.53 5,684.15 5,051.14 5,942.52 35.62 76.72 11.00 275,000 4,404.26 5,181.48 4,624.47 5,440.55 4,844.68 5,699.63 5,064.90 5,958.70 35.75 77.00 11.00 276,000 4,416.22 5,195.55 4,637.03 5,455.33 4,857.84 5,715.11 5,078.65 5,974.88 35.88 77.28 12.00 277,000 4,428.18 5,209.62 4,649.59 5,470.10 4,870.99 5,730.58 5,092.40 5,991.06 36.01 77.56 12.00 278,000 4,440.14 5,223.69 4,662.14 5,484.87 4,884.15 5,746.06 5,106.16 6,007.24 36.14 77.84 12.00 279,000 4,452.10 5,237.76 4,674.70 5,499.65 4,897.31 5,761.54 5,119.91 6,023.42 36.27 78.12 12.00 39
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 280,000 4,464.06 5,251.83 4,687.26 5,514.42 4,910.46 5,777.01 5,133.66 6,039.60 36.40 78.40 12.00 281,000 4,476.02 5,265.90 4,699.82 5,529.20 4,923.62 5,792.49 5,147.42 6,055.79 36.53 78.68 12.00 282,000 4,487.97 5,279.97 4,712.37 5,543.97 4,936.77 5,807.97 5,161.17 6,071.97 36.66 78.96 12.00 283,000 4,499.93 5,294.04 4,724.93 5,558.74 4,949.93 5,823.44 5,174.92 6,088.15 36.79 79.24 12.00 284,000 4,511.89 5,308.11 4,737.49 5,573.52 4,963.08 5,838.92 5,188.68 6,104.33 36.92 79.52 12.00 285,000 4,523.85 5,322.18 4,750.05 5,588.29 4,976.24 5,854.40 5,202.43 6,120.51 37.05 79.80 12.00 286,000 4,535.81 5,336.25 4,762.60 5,603.06 4,989.39 5,869.88 5,216.18 6,136.69 37.18 80.08 12.00 287,000 4,547.77 5,350.32 4,775.16 5,617.84 5,002.55 5,885.35 5,229.94 6,152.87 37.31 80.36 12.00 288,000 4,559.73 5,364.39 4,787.72 5,632.61 5,015.70 5,900.83 5,243.69 6,169.05 37.44 80.64 12.00 289,000 4,571.69 5,378.46 4,800.28 5,647.38 5,028.86 5,916.31 5,257.44 6,185.23 37.57 80.92 12.00 290,000 4,583.65 5,392.53 4,812.83 5,662.16 5,042.02 5,931.78 5,271.20 6,201.41 37.70 81.20 12.00 291,000 4,595.61 5,406.60 4,825.39 5,676.93 5,055.17 5,947.26 5,284.95 6,217.59 37.83 81.48 12.00 292,000 4,607.57 5,420.67 4,837.95 5,691.70 5,068.33 5,962.74 5,298.70 6,233.77 37.96 81.76 12.00 293,000 4,619.53 5,434.74 4,850.51 5,706.48 5,081.48 5,978.21 5,312.46 6,249.95 38.09 82.04 12.00 294,000 4,631.49 5,448.81 4,863.06 5,721.25 5,094.64 5,993.69 5,326.21 6,266.13 38.22 82.32 12.00 295,000 4,643.45 5,462.88 4,875.62 5,736.02 5,107.79 6,009.17 5,339.97 6,282.31 38.35 82.60 12.00 296,000 4,655.41 5,476.95 4,888.18 5,750.80 5,120.95 6,024.65 5,353.72 6,298.49 38.48 82.88 12.00 297,000 4,667.37 5,491.02 4,900.74 5,765.57 5,134.10 6,040.12 5,367.47 6,314.67 38.61 83.16 12.00 298,000 4,679.33 5,505.09 4,913.29 5,780.34 5,147.26 6,055.60 5,381.23 6,330.85 38.74 83.44 12.00 299,000 4,691.29 5,519.16 4,925.85 5,795.12 5,160.41 6,071.08 5,394.98 6,347.03 38.87 83.72 12.00 300,000 4,703.25 5,533.23 4,938.41 5,809.89 5,173.57 6,086.55 5,408.73 6,363.21 39.00 84.00 12.00 301,000 4,715.21 5,547.30 4,950.97 5,824.67 5,186.73 6,102.03 5,422.49 6,379.40 39.13 84.28 13.00 302,000 4,727.16 5,561.37 4,963.52 5,839.44 5,199.88 6,117.51 5,436.24 6,395.58 39.26 84.56 13.00 303,000 4,739.12 5,575.44 4,976.08 5,854.21 5,213.04 6,132.98 5,449.99 6,411.76 39.39 84.84 13.00 304,000 4,751.08 5,589.51 4,988.64 5,868.99 5,226.19 6,148.46 5,463.75 6,427.94 39.52 85.12 13.00 305,000 4,763.04 5,603.58 5,001.20 5,883.76 5,239.35 6,163.94 5,477.50 6,444.12 39.65 85.40 13.00 306,000 4,775.00 5,617.65 5,013.75 5,898.53 5,252.50 6,179.42 5,491.25 6,460.30 39.78 85.68 13.00 307,000 4,786.96 5,631.72 5,026.31 5,913.31 5,265.66 6,194.89 5,505.01 6,476.48 39.91 85.96 13.00 308,000 4,798.92 5,645.79 5,038.87 5,928.08 5,278.81 6,210.37 5,518.76 6,492.66 40.04 86.24 13.00 309,000 4,810.88 5,659.86 5,051.43 5,942.85 5,291.97 6,225.85 5,532.51 6,508.84 40.17 86.52 13.00 310,000 4,822.84 5,673.93 5,063.98 5,957.63 5,305.12 6,241.32 5,546.27 6,525.02 40.30 86.80 13.00 311,000 4,834.80 5,688.00 5,076.54 5,972.40 5,318.28 6,256.80 5,560.02 6,541.20 40.43 87.08 13.00 312,000 4,846.76 5,702.07 5,089.10 5,987.17 5,331.44 6,272.28 5,573.77 6,557.38 40.56 87.36 13.00 313,000 4,858.72 5,716.14 5,101.65 6,001.95 5,344.59 6,287.75 5,587.53 6,573.56 40.69 87.64 13.00 314,000 4,870.68 5,730.21 5,114.21 6,016.72 5,357.75 6,303.23 5,601.28 6,589.74 40.82 87.92 13.00 315,000 4,882.64 5,744.28 5,126.77 6,031.49 5,370.90 6,318.71 5,615.03 6,605.92 40.95 88.20 13.00 316,000 4,894.60 5,758.35 5,139.33 6,046.27 5,384.06 6,334.19 5,628.79 6,622.10 41.08 88.48 13.00 317,000 4,906.56 5,772.42 5,151.88 6,061.04 5,397.21 6,349.66 5,642.54 6,638.28 41.21 88.76 13.00 318,000 4,918.52 5,786.49 5,164.44 6,075.81 5,410.37 6,365.14 5,656.29 6,654.46 41.34 89.04 13.00 319,000 4,930.48 5,800.56 5,177.00 6,090.59 5,423.52 6,380.62 5,670.05 6,670.64 41.47 89.32 13.00 40
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 320,000 4,942.44 5,814.63 5,189.56 6,105.36 5,436.68 6,396.09 5,683.80 6,686.82 41.60 89.60 13.00 321,000 4,954.40 5,828.70 5,202.11 6,120.14 5,449.83 6,411.57 5,697.55 6,703.01 41.73 89.88 13.00 322,000 4,966.35 5,842.77 5,214.67 6,134.91 5,462.99 6,427.05 5,711.31 6,719.19 41.86 90.16 13.00 323,000 4,978.31 5,856.84 5,227.23 6,149.68 5,476.15 6,442.52 5,725.06 6,735.37 41.99 90.44 13.00 324,000 4,990.27 5,870.91 5,239.79 6,164.46 5,489.30 6,458.00 5,738.81 6,751.55 42.12 90.72 13.00 325,000 5,002.23 5,884.98 5,252.34 6,179.23 5,502.46 6,473.48 5,752.57 6,767.73 42.25 91.00 13.00 326,000 5,014.19 5,899.05 5,264.90 6,194.00 5,515.61 6,488.96 5,766.32 6,783.91 42.38 91.28 14.00 327,000 5,026.15 5,913.12 5,277.46 6,208.78 5,528.77 6,504.43 5,780.07 6,800.09 42.51 91.56 14.00 328,000 5,038.11 5,927.19 5,290.02 6,223.55 5,541.92 6,519.91 5,793.83 6,816.27 42.64 91.84 14.00 329,000 5,050.07 5,941.26 5,302.57 6,238.32 5,555.08 6,535.39 5,807.58 6,832.45 42.77 92.12 14.00 330,000 5,062.03 5,955.33 5,315.13 6,253.10 5,568.23 6,550.86 5,821.34 6,848.63 42.90 92.40 14.00 331,000 5,073.99 5,969.40 5,327.69 6,267.87 5,581.39 6,566.34 5,835.09 6,864.81 43.03 92.68 14.00 332,000 5,085.95 5,983.47 5,340.25 6,282.64 5,594.54 6,581.82 5,848.84 6,880.99 43.16 92.96 14.00 333,000 5,097.91 5,997.54 5,352.80 6,297.42 5,607.70 6,597.29 5,862.60 6,897.17 43.29 93.24 14.00 334,000 5,109.87 6,011.61 5,365.36 6,312.19 5,620.86 6,612.77 5,876.35 6,913.35 43.42 93.52 14.00 335,000 5,121.83 6,025.68 5,377.92 6,326.96 5,634.01 6,628.25 5,890.10 6,929.53 43.55 93.80 14.00 336,000 5,133.79 6,039.75 5,390.48 6,341.74 5,647.17 6,643.73 5,903.86 6,945.71 43.68 94.08 14.00 337,000 5,145.75 6,053.82 5,403.03 6,356.51 5,660.32 6,659.20 5,917.61 6,961.89 43.81 94.36 14.00 338,000 5,157.71 6,067.89 5,415.59 6,371.28 5,673.48 6,674.68 5,931.36 6,978.07 43.94 94.64 14.00 339,000 5,169.67 6,081.96 5,428.15 6,386.06 5,686.63 6,690.16 5,945.12 6,994.25 44.07 94.92 14.00 340,000 5,181.63 6,096.03 5,440.71 6,400.83 5,699.79 6,705.63 5,958.87 7,010.43 44.20 95.20 14.00 341,000 5,193.59 6,110.10 5,453.26 6,415.61 5,712.94 6,721.11 5,972.62 7,026.62 44.33 95.48 14.00 342,000 5,205.54 6,124.17 5,465.82 6,430.38 5,726.10 6,736.59 5,986.38 7,042.80 44.46 95.76 14.00 343,000 5,217.50 6,138.24 5,478.38 6,445.15 5,739.25 6,752.06 6,000.13 7,058.98 44.59 96.04 14.00 344,000 5,229.46 6,152.31 5,490.94 6,459.93 5,752.41 6,767.54 6,013.88 7,075.16 44.72 96.32 14.00 345,000 5,241.42 6,166.38 5,503.49 6,474.70 5,765.57 6,783.02 6,027.64 7,091.34 44.85 96.60 14.00 346,000 5,253.38 6,180.45 5,516.05 6,489.47 5,778.72 6,798.50 6,041.39 7,107.52 44.98 96.88 14.00 347,000 5,265.34 6,194.52 5,528.61 6,504.25 5,791.88 6,813.97 6,055.14 7,123.70 45.11 97.16 14.00 348,000 5,277.30 6,208.59 5,541.17 6,519.02 5,805.03 6,829.45 6,068.90 7,139.88 45.24 97.44 14.00 349,000 5,289.26 6,222.66 5,553.72 6,533.79 5,818.19 6,844.93 6,082.65 7,156.06 45.37 97.72 14.00 350,000 5,301.22 6,236.73 5,566.28 6,548.57 5,831.34 6,860.40 6,096.40 7,172.24 45.50 98.00 14.00 351,000 5,313.18 6,250.80 5,578.84 6,563.34 5,844.50 6,875.88 6,110.16 7,188.42 45.63 98.28 15.00 352,000 5,325.14 6,264.87 5,591.40 6,578.11 5,857.65 6,891.36 6,123.91 7,204.60 45.76 98.56 15.00 353,000 5,337.10 6,278.94 5,603.95 6,592.89 5,870.81 6,906.83 6,137.66 7,220.78 45.89 98.84 15.00 354,000 5,349.06 6,293.01 5,616.51 6,607.66 5,883.96 6,922.31 6,151.42 7,236.96 46.02 99.12 15.00 355,000 5,361.02 6,307.08 5,629.07 6,622.43 5,897.12 6,937.79 6,165.17 7,253.14 46.15 99.40 15.00 356,000 5,372.98 6,321.15 5,641.63 6,637.21 5,910.28 6,953.27 6,178.92 7,269.32 46.28 99.68 15.00 357,000 5,384.94 6,335.22 5,654.18 6,651.98 5,923.43 6,968.74 6,192.68 7,285.50 46.41 99.96 15.00 358,000 5,396.90 6,349.29 5,666.74 6,666.75 5,936.59 6,984.22 6,206.43 7,301.68 46.54 100.24 15.00 359,000 5,408.86 6,363.36 5,679.30 6,681.53 5,949.74 6,999.70 6,220.18 7,317.86 46.67 100.52 15.00 41
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 360,000 5,420.82 6,377.43 5,691.86 6,696.30 5,962.90 7,015.17 6,233.94 7,334.04 46.80 100.80 15.00 361,000 5,432.78 6,391.50 5,704.41 6,711.08 5,976.05 7,030.65 6,247.69 7,350.23 46.93 101.08 15.00 362,000 5,444.73 6,405.57 5,716.97 6,725.85 5,989.21 7,046.13 6,261.44 7,366.41 47.06 101.36 15.00 363,000 5,456.69 6,419.64 5,729.53 6,740.62 6,002.36 7,061.60 6,275.20 7,382.59 47.19 101.64 15.00 364,000 5,468.65 6,433.71 5,742.09 6,755.40 6,015.52 7,077.08 6,288.95 7,398.77 47.32 101.92 15.00 365,000 5,480.61 6,447.78 5,754.64 6,770.17 6,028.67 7,092.56 6,302.70 7,414.95 47.45 102.20 15.00 366,000 5,492.57 6,461.85 5,767.20 6,784.94 6,041.83 7,108.04 6,316.46 7,431.13 47.58 102.48 15.00 367,000 5,504.53 6,475.92 5,779.76 6,799.72 6,054.99 7,123.51 6,330.21 7,447.31 47.71 102.76 15.00 368,000 5,516.49 6,489.99 5,792.32 6,814.49 6,068.14 7,138.99 6,343.97 7,463.49 47.84 103.04 15.00 369,000 5,528.45 6,504.06 5,804.87 6,829.26 6,081.30 7,154.47 6,357.72 7,479.67 47.97 103.32 15.00 370,000 5,540.41 6,518.13 5,817.43 6,844.04 6,094.45 7,169.94 6,371.47 7,495.85 48.10 103.60 15.00 371,000 5,552.37 6,532.20 5,829.99 6,858.81 6,107.61 7,185.42 6,385.23 7,512.03 48.23 103.88 15.00 372,000 5,564.33 6,546.27 5,842.55 6,873.58 6,120.76 7,200.90 6,398.98 7,528.21 48.36 104.16 15.00 373,000 5,576.29 6,560.34 5,855.10 6,888.36 6,133.92 7,216.37 6,412.73 7,544.39 48.49 104.44 15.00 374,000 5,588.25 6,574.41 5,867.66 6,903.13 6,147.07 7,231.85 6,426.49 7,560.57 48.62 104.72 15.00 375,000 5,600.21 6,588.48 5,880.22 6,917.90 6,160.23 7,247.33 6,440.24 7,576.75 48.75 105.00 15.00 376,000 5,612.17 6,602.55 5,892.78 6,932.68 6,173.38 7,262.81 6,453.99 7,592.93 48.88 105.28 16.00 377,000 5,624.13 6,616.62 5,905.33 6,947.45 6,186.54 7,278.28 6,467.75 7,609.11 49.01 105.56 16.00 378,000 5,636.09 6,630.69 5,917.89 6,962.22 6,199.70 7,293.76 6,481.50 7,625.29 49.14 105.84 16.00 379,000 5,648.05 6,644.76 5,930.45 6,977.00 6,212.85 7,309.24 6,495.25 7,641.47 49.27 106.12 16.00 380,000 5,660.01 6,658.83 5,943.01 6,991.77 6,226.01 7,324.71 6,509.01 7,657.65 49.40 106.40 16.00 381,000 5,671.97 6,672.90 5,955.56 7,006.55 6,239.16 7,340.19 6,522.76 7,673.84 49.53 106.68 16.00 382,000 5,683.92 6,686.97 5,968.12 7,021.32 6,252.32 7,355.67 6,536.51 7,690.02 49.66 106.96 16.00 383,000 5,695.88 6,701.04 5,980.68 7,036.09 6,265.47 7,371.14 6,550.27 7,706.20 49.79 107.24 16.00 384,000 5,707.84 6,715.11 5,993.24 7,050.87 6,278.63 7,386.62 6,564.02 7,722.38 49.92 107.52 16.00 385,000 5,719.80 6,729.18 6,005.79 7,065.64 6,291.78 7,402.10 6,577.77 7,738.56 50.05 107.80 16.00 386,000 5,731.76 6,743.25 6,018.35 7,080.41 6,304.94 7,417.58 6,591.53 7,754.74 50.18 108.08 16.00 387,000 5,743.72 6,757.32 6,030.91 7,095.19 6,318.09 7,433.05 6,605.28 7,770.92 50.31 108.36 16.00 388,000 5,755.68 6,771.39 6,043.47 7,109.96 6,331.25 7,448.53 6,619.03 7,787.10 50.44 108.64 16.00 389,000 5,767.64 6,785.46 6,056.02 7,124.73 6,344.41 7,464.01 6,632.79 7,803.28 50.57 108.92 16.00 390,000 5,779.60 6,799.53 6,068.58 7,139.51 6,357.56 7,479.48 6,646.54 7,819.46 50.70 109.20 16.00 391,000 5,791.56 6,813.60 6,081.14 7,154.28 6,370.72 7,494.96 6,660.29 7,835.64 50.83 109.48 16.00 392,000 5,803.52 6,827.67 6,093.70 7,169.05 6,383.87 7,510.44 6,674.05 7,851.82 50.96 109.76 16.00 393,000 5,815.48 6,841.74 6,106.25 7,183.83 6,397.03 7,525.91 6,687.80 7,868.00 51.09 110.04 16.00 394,000 5,827.44 6,855.81 6,118.81 7,198.60 6,410.18 7,541.39 6,701.55 7,884.18 51.22 110.32 16.00 395,000 5,839.40 6,869.88 6,131.37 7,213.37 6,423.34 7,556.87 6,715.31 7,900.36 51.35 110.60 16.00 396,000 5,851.36 6,883.95 6,143.93 7,228.15 6,436.49 7,572.35 6,729.06 7,916.54 51.48 110.88 16.00 397,000 5,863.32 6,898.02 6,156.48 7,242.92 6,449.65 7,587.82 6,742.81 7,932.72 51.61 111.16 16.00 398,000 5,875.28 6,912.09 6,169.04 7,257.69 6,462.80 7,603.30 6,756.57 7,948.90 51.74 111.44 16.00 399,000 5,887.24 6,926.16 6,181.60 7,272.47 6,475.96 7,618.78 6,770.32 7,965.08 51.87 111.72 16.00 42
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 400,000 5,899.20 6,940.23 6,194.16 7,287.24 6,489.12 7,634.25 6,784.07 7,981.26 52.00 112.00 16.00 401,000 5,911.16 6,954.30 6,206.71 7,302.02 6,502.27 7,649.73 6,797.83 7,997.45 52.13 112.28 17.00 402,000 5,923.11 6,968.37 6,219.27 7,316.79 6,515.43 7,665.21 6,811.58 8,013.63 52.26 112.56 17.00 403,000 5,935.07 6,982.44 6,231.83 7,331.56 6,528.58 7,680.68 6,825.34 8,029.81 52.39 112.84 17.00 404,000 5,947.03 6,996.51 6,244.39 7,346.34 6,541.74 7,696.16 6,839.09 8,045.99 52.52 113.12 17.00 405,000 5,958.99 7,010.58 6,256.94 7,361.11 6,554.89 7,711.64 6,852.84 8,062.17 52.65 113.40 17.00 406,000 5,970.95 7,024.65 6,269.50 7,375.88 6,568.05 7,727.12 6,866.60 8,078.35 52.78 113.68 17.00 407,000 5,982.91 7,038.72 6,282.06 7,390.66 6,581.20 7,742.59 6,880.35 8,094.53 52.91 113.96 17.00 408,000 5,994.87 7,052.79 6,294.62 7,405.43 6,594.36 7,758.07 6,894.10 8,110.71 53.04 114.24 17.00 409,000 6,006.83 7,066.86 6,307.17 7,420.20 6,607.51 7,773.55 6,907.86 8,126.89 53.17 114.52 17.00 410,000 6,018.79 7,080.93 6,319.73 7,434.98 6,620.67 7,789.02 6,921.61 8,143.07 53.30 114.80 17.00 411,000 6,030.75 7,095.00 6,332.29 7,449.75 6,633.83 7,804.50 6,935.36 8,159.25 53.43 115.08 17.00 412,000 6,042.71 7,109.07 6,344.84 7,464.52 6,646.98 7,819.98 6,949.12 8,175.43 53.56 115.36 17.00 413,000 6,054.67 7,123.14 6,357.40 7,479.30 6,660.14 7,835.45 6,962.87 8,191.61 53.69 115.64 17.00 414,000 6,066.63 7,137.21 6,369.96 7,494.07 6,673.29 7,850.93 6,976.62 8,207.79 53.82 115.92 17.00 415,000 6,078.59 7,151.28 6,382.52 7,508.84 6,686.45 7,866.41 6,990.38 8,223.97 53.95 116.20 17.00 416,000 6,090.55 7,165.35 6,395.07 7,523.62 6,699.60 7,881.89 7,004.13 8,240.15 54.08 116.48 17.00 417,000 6,102.51 7,179.42 6,407.63 7,538.39 6,712.76 7,897.36 7,017.88 8,256.33 54.21 116.76 17.00 418,000 6,114.47 7,193.49 6,420.19 7,553.16 6,725.91 7,912.84 7,031.64 8,272.51 54.34 117.04 17.00 419,000 6,126.43 7,207.56 6,432.75 7,567.94 6,739.07 7,928.32 7,045.39 8,288.69 54.47 117.32 17.00 420,000 6,138.39 7,221.63 6,445.30 7,582.71 6,752.22 7,943.79 7,059.14 8,304.87 54.60 117.60 17.00 421,000 6,150.35 7,235.70 6,457.86 7,597.49 6,765.38 7,959.27 7,072.90 8,321.06 54.73 117.88 17.00 422,000 6,162.30 7,249.77 6,470.42 7,612.26 6,778.53 7,974.75 7,086.65 8,337.24 54.86 118.16 17.00 423,000 6,174.26 7,263.84 6,482.98 7,627.03 6,791.69 7,990.22 7,100.40 8,353.42 54.99 118.44 17.00 424,000 6,186.22 7,277.91 6,495.53 7,641.81 6,804.85 8,005.70 7,114.16 8,369.60 55.12 118.72 17.00 425,000 6,198.18 7,291.98 6,508.09 7,656.58 6,818.00 8,021.18 7,127.91 8,385.78 55.25 119.00 17.00 426,000 6,210.14 7,306.05 6,520.65 7,671.35 6,831.16 8,036.66 7,141.66 8,401.96 55.38 119.28 18.00 427,000 6,222.10 7,320.12 6,533.21 7,686.13 6,844.31 8,052.13 7,155.42 8,418.14 55.51 119.56 18.00 428,000 6,234.06 7,334.19 6,545.76 7,700.90 6,857.47 8,067.61 7,169.17 8,434.32 55.64 119.84 18.00 429,000 6,246.02 7,348.26 6,558.32 7,715.67 6,870.62 8,083.09 7,182.92 8,450.50 55.77 120.12 18.00 430,000 6,257.98 7,362.33 6,570.88 7,730.45 6,883.78 8,098.56 7,196.68 8,466.68 55.90 120.40 18.00 431,000 6,269.94 7,376.40 6,583.44 7,745.22 6,896.93 8,114.04 7,210.43 8,482.86 56.03 120.68 18.00 432,000 6,281.90 7,390.47 6,595.99 7,759.99 6,910.09 8,129.52 7,224.18 8,499.04 56.16 120.96 18.00 433,000 6,293.86 7,404.54 6,608.55 7,774.77 6,923.24 8,144.99 7,237.94 8,515.22 56.29 121.24 18.00 434,000 6,305.82 7,418.61 6,621.11 7,789.54 6,936.40 8,160.47 7,251.69 8,531.40 56.42 121.52 18.00 435,000 6,317.78 7,432.68 6,633.67 7,804.31 6,949.56 8,175.95 7,265.44 8,547.58 56.55 121.80 18.00 436,000 6,329.74 7,446.75 6,646.22 7,819.09 6,962.71 8,191.43 7,279.20 8,563.76 56.68 122.08 18.00 437,000 6,341.70 7,460.82 6,658.78 7,833.86 6,975.87 8,206.90 7,292.95 8,579.94 56.81 122.36 18.00 438,000 6,353.66 7,474.89 6,671.34 7,848.63 6,989.02 8,222.38 7,306.70 8,596.12 56.94 122.64 18.00 439,000 6,365.62 7,488.96 6,683.90 7,863.41 7,002.18 8,237.86 7,320.46 8,612.30 57.07 122.92 18.00 43
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 440,000 6,377.58 7,503.03 6,696.45 7,878.18 7,015.33 8,253.33 7,334.21 8,628.48 57.20 123.20 18.00 441,000 6,389.54 7,517.10 6,709.01 7,892.96 7,028.49 8,268.81 7,347.97 8,644.67 57.33 123.48 18.00 442,000 6,401.49 7,531.17 6,721.57 7,907.73 7,041.64 8,284.29 7,361.72 8,660.85 57.46 123.76 18.00 443,000 6,413.45 7,545.24 6,734.13 7,922.50 7,054.80 8,299.76 7,375.47 8,677.03 57.59 124.04 18.00 444,000 6,425.41 7,559.31 6,746.68 7,937.28 7,067.95 8,315.24 7,389.23 8,693.21 57.72 124.32 18.00 445,000 6,437.37 7,573.38 6,759.24 7,952.05 7,081.11 8,330.72 7,402.98 8,709.39 57.85 124.60 18.00 446,000 6,449.33 7,587.45 6,771.80 7,966.82 7,094.27 8,346.20 7,416.73 8,725.57 57.98 124.88 18.00 447,000 6,461.29 7,601.52 6,784.36 7,981.60 7,107.42 8,361.67 7,430.49 8,741.75 58.11 125.16 18.00 448,000 6,473.25 7,615.59 6,796.91 7,996.37 7,120.58 8,377.15 7,444.24 8,757.93 58.24 125.44 18.00 449,000 6,485.21 7,629.66 6,809.47 8,011.14 7,133.73 8,392.63 7,457.99 8,774.11 58.37 125.72 18.00 450,000 6,497.17 7,643.73 6,822.03 8,025.92 7,146.89 8,408.10 7,471.75 8,790.29 58.50 126.00 18.00 451,000 6,509.13 7,657.80 6,834.59 8,040.69 7,160.04 8,423.58 7,485.50 8,806.47 58.63 126.28 19.00 452,000 6,521.09 7,671.87 6,847.14 8,055.46 7,173.20 8,439.06 7,499.25 8,822.65 58.76 126.56 19.00 453,000 6,533.05 7,685.94 6,859.70 8,070.24 7,186.35 8,454.53 7,513.01 8,838.83 58.89 126.84 19.00 454,000 6,545.01 7,700.01 6,872.26 8,085.01 7,199.51 8,470.01 7,526.76 8,855.01 59.02 127.12 19.00 455,000 6,556.97 7,714.08 6,884.82 8,099.78 7,212.66 8,485.49 7,540.51 8,871.19 59.15 127.40 19.00 456,000 6,568.93 7,728.15 6,897.37 8,114.56 7,225.82 8,500.97 7,554.27 8,887.37 59.28 127.68 19.00 457,000 6,580.89 7,742.22 6,909.93 8,129.33 7,238.98 8,516.44 7,568.02 8,903.55 59.41 127.96 19.00 458,000 6,592.85 7,756.29 6,922.49 8,144.10 7,252.13 8,531.92 7,581.77 8,919.73 59.54 128.24 19.00 459,000 6,604.81 7,770.36 6,935.05 8,158.88 7,265.29 8,547.40 7,595.53 8,935.91 59.67 128.52 19.00 460,000 6,616.77 7,784.43 6,947.60 8,173.65 7,278.44 8,562.87 7,609.28 8,952.09 59.80 128.80 19.00 461,000 6,628.73 7,798.50 6,960.16 8,188.43 7,291.60 8,578.35 7,623.03 8,968.28 59.93 129.08 19.00 462,000 6,640.68 7,812.57 6,972.72 8,203.20 7,304.75 8,593.83 7,636.79 8,984.46 60.06 129.36 19.00 463,000 6,652.64 7,826.64 6,985.28 8,217.97 7,317.91 8,609.30 7,650.54 9,000.64 60.19 129.64 19.00 464,000 6,664.60 7,840.71 6,997.83 8,232.75 7,331.06 8,624.78 7,664.29 9,016.82 60.32 129.92 19.00 465,000 6,676.56 7,854.78 7,010.39 8,247.52 7,344.22 8,640.26 7,678.05 9,033.00 60.45 130.20 19.00 466,000 6,688.52 7,868.85 7,022.95 8,262.29 7,357.37 8,655.74 7,691.80 9,049.18 60.58 130.48 19.00 467,000 6,700.48 7,882.92 7,035.51 8,277.07 7,370.53 8,671.21 7,705.55 9,065.36 60.71 130.76 19.00 468,000 6,712.44 7,896.99 7,048.06 8,291.84 7,383.69 8,686.69 7,719.31 9,081.54 60.84 131.04 19.00 469,000 6,724.40 7,911.06 7,060.62 8,306.61 7,396.84 8,702.17 7,733.06 9,097.72 60.97 131.32 19.00 470,000 6,736.36 7,925.13 7,073.18 8,321.39 7,410.00 8,717.64 7,746.81 9,113.90 61.10 131.60 19.00 471,000 6,748.32 7,939.20 7,085.74 8,336.16 7,423.15 8,733.12 7,760.57 9,130.08 61.23 131.88 19.00 472,000 6,760.28 7,953.27 7,098.29 8,350.93 7,436.31 8,748.60 7,774.32 9,146.26 61.36 132.16 19.00 473,000 6,772.24 7,967.34 7,110.85 8,365.71 7,449.46 8,764.07 7,788.07 9,162.44 61.49 132.44 19.00 474,000 6,784.20 7,981.41 7,123.41 8,380.48 7,462.62 8,779.55 7,801.83 9,178.62 61.62 132.72 19.00 475,000 6,796.16 7,995.48 7,135.97 8,395.25 7,475.77 8,795.03 7,815.58 9,194.80 61.75 133.00 19.00 476,000 6,808.12 8,009.55 7,148.52 8,410.03 7,488.93 8,810.51 7,829.34 9,210.98 61.88 133.28 20.00 477,000 6,820.08 8,023.62 7,161.08 8,424.80 7,502.08 8,825.98 7,843.09 9,227.16 62.01 133.56 20.00 478,000 6,832.04 8,037.69 7,173.64 8,439.57 7,515.24 8,841.46 7,856.84 9,243.34 62.14 133.84 20.00 479,000 6,844.00 8,051.76 7,186.20 8,454.35 7,528.40 8,856.94 7,870.60 9,259.52 62.27 134.12 20.00 44
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 480,000 6,855.96 8,065.83 7,198.75 8,469.12 7,541.55 8,872.41 7,884.35 9,275.70 62.40 134.40 20.00 481,000 6,867.92 8,079.90 7,211.31 8,483.90 7,554.71 8,887.89 7,898.10 9,291.89 62.53 134.68 20.00 482,000 6,879.87 8,093.97 7,223.87 8,498.67 7,567.86 8,903.37 7,911.86 9,308.07 62.66 134.96 20.00 483,000 6,891.83 8,108.04 7,236.43 8,513.44 7,581.02 8,918.84 7,925.61 9,324.25 62.79 135.24 20.00 484,000 6,903.79 8,122.11 7,248.98 8,528.22 7,594.17 8,934.32 7,939.36 9,340.43 62.92 135.52 20.00 485,000 6,915.75 8,136.18 7,261.54 8,542.99 7,607.33 8,949.80 7,953.12 9,356.61 63.05 135.80 20.00 486,000 6,927.71 8,150.25 7,274.10 8,557.76 7,620.48 8,965.28 7,966.87 9,372.79 63.18 136.08 20.00 487,000 6,939.67 8,164.32 7,286.66 8,572.54 7,633.64 8,980.75 7,980.62 9,388.97 63.31 136.36 20.00 488,000 6,951.63 8,178.39 7,299.21 8,587.31 7,646.79 8,996.23 7,994.38 9,405.15 63.44 136.64 20.00 489,000 6,963.59 8,192.46 7,311.77 8,602.08 7,659.95 9,011.71 8,008.13 9,421.33 63.57 136.92 20.00 490,000 6,975.55 8,206.53 7,324.33 8,616.86 7,673.11 9,027.18 8,021.88 9,437.51 63.70 137.20 20.00 491,000 6,987.51 8,220.60 7,336.89 8,631.63 7,686.26 9,042.66 8,035.64 9,453.69 63.83 137.48 20.00 492,000 6,999.47 8,234.67 7,349.44 8,646.40 7,699.42 9,058.14 8,049.39 9,469.87 63.96 137.76 20.00 493,000 7,011.43 8,248.74 7,362.00 8,661.18 7,712.57 9,073.61 8,063.14 9,486.05 64.09 138.04 20.00 494,000 7,023.39 8,262.81 7,374.56 8,675.95 7,725.73 9,089.09 8,076.90 9,502.23 64.22 138.32 20.00 495,000 7,035.35 8,276.88 7,387.12 8,690.72 7,738.88 9,104.57 8,090.65 9,518.41 64.35 138.60 20.00 496,000 7,047.31 8,290.95 7,399.67 8,705.50 7,752.04 9,120.05 8,104.40 9,534.59 64.48 138.88 20.00 497,000 7,059.27 8,305.02 7,412.23 8,720.27 7,765.19 9,135.52 8,118.16 9,550.77 64.61 139.16 20.00 498,000 7,071.23 8,319.09 7,424.79 8,735.04 7,778.35 9,151.00 8,131.91 9,566.95 64.74 139.44 20.00 499,000 7,083.19 8,333.16 7,437.35 8,749.82 7,791.50 9,166.48 8,145.66 9,583.13 64.87 139.72 20.00 500,000 7,095.15 8,347.23 7,449.90 8,764.59 7,804.66 9,181.95 8,159.42 9,599.31 65.00 140.00 20.00 501,000 7,107.11 8,361.30 7,462.46 8,779.37 7,817.82 9,197.43 8,173.17 9,615.50 65.13 140.28 21.00 502,000 7,119.06 8,375.37 7,475.02 8,794.14 7,830.97 9,212.91 8,186.92 9,631.68 65.26 140.56 21.00 503,000 7,131.02 8,389.44 7,487.58 8,808.91 7,844.13 9,228.38 8,200.68 9,647.86 65.39 140.84 21.00 504,000 7,142.98 8,403.51 7,500.13 8,823.69 7,857.28 9,243.86 8,214.43 9,664.04 65.52 141.12 21.00 505,000 7,154.94 8,417.58 7,512.69 8,838.46 7,870.44 9,259.34 8,228.18 9,680.22 65.65 141.40 21.00 506,000 7,166.90 8,431.65 7,525.25 8,853.23 7,883.59 9,274.82 8,241.94 9,696.40 65.78 141.68 21.00 507,000 7,178.86 8,445.72 7,537.81 8,868.01 7,896.75 9,290.29 8,255.69 9,712.58 65.91 141.96 21.00 508,000 7,190.82 8,459.79 7,550.36 8,882.78 7,909.90 9,305.77 8,269.44 9,728.76 66.04 142.24 21.00 509,000 7,202.78 8,473.86 7,562.92 8,897.55 7,923.06 9,321.25 8,283.20 9,744.94 66.17 142.52 21.00 510,000 7,214.74 8,487.93 7,575.48 8,912.33 7,936.21 9,336.72 8,296.95 9,761.12 66.30 142.80 21.00 511,000 7,226.70 8,502.00 7,588.04 8,927.10 7,949.37 9,352.20 8,310.71 9,777.30 66.43 143.08 21.00 512,000 7,238.66 8,516.07 7,600.59 8,941.87 7,962.53 9,367.68 8,324.46 9,793.48 66.56 143.36 21.00 513,000 7,250.62 8,530.14 7,613.15 8,956.65 7,975.68 9,383.15 8,338.21 9,809.66 66.69 143.64 21.00 514,000 7,262.58 8,544.21 7,625.71 8,971.42 7,988.84 9,398.63 8,351.97 9,825.84 66.82 143.92 21.00 515,000 7,274.54 8,558.28 7,638.26 8,986.19 8,001.99 9,414.11 8,365.72 9,842.02 66.95 144.20 21.00 516,000 7,286.50 8,572.35 7,650.82 9,000.97 8,015.15 9,429.59 8,379.47 9,858.20 67.08 144.48 21.00 517,000 7,298.46 8,586.42 7,663.38 9,015.74 8,028.30 9,445.06 8,393.23 9,874.38 67.21 144.76 21.00 518,000 7,310.42 8,600.49 7,675.94 9,030.51 8,041.46 9,460.54 8,406.98 9,890.56 67.34 145.04 21.00 519,000 7,322.38 8,614.56 7,688.49 9,045.29 8,054.61 9,476.02 8,420.73 9,906.74 67.47 145.32 21.00 45
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 520,000 7,334.34 8,628.63 7,701.05 9,060.06 8,067.77 9,491.49 8,434.49 9,922.92 67.60 145.60 21.00 521,000 7,346.30 8,642.70 7,713.61 9,074.84 8,080.92 9,506.97 8,448.24 9,939.11 67.73 145.88 21.00 522,000 7,358.25 8,656.77 7,726.17 9,089.61 8,094.08 9,522.45 8,461.99 9,955.29 67.86 146.16 21.00 523,000 7,370.21 8,670.84 7,738.72 9,104.38 8,107.24 9,537.92 8,475.75 9,971.47 67.99 146.44 21.00 524,000 7,382.17 8,684.91 7,751.28 9,119.16 8,120.39 9,553.40 8,489.50 9,987.65 68.12 146.72 21.00 525,000 7,394.13 8,698.98 7,763.84 9,133.93 8,133.55 9,568.88 8,503.25 10,003.83 68.25 147.00 21.00 526,000 7,406.09 8,713.05 7,776.40 9,148.70 8,146.70 9,584.36 8,517.01 10,020.01 68.38 147.28 22.00 527,000 7,418.05 8,727.12 7,788.95 9,163.48 8,159.86 9,599.83 8,530.76 10,036.19 68.51 147.56 22.00 528,000 7,430.01 8,741.19 7,801.51 9,178.25 8,173.01 9,615.31 8,544.51 10,052.37 68.64 147.84 22.00 529,000 7,441.97 8,755.26 7,814.07 9,193.02 8,186.17 9,630.79 8,558.27 10,068.55 68.77 148.12 22.00 530,000 7,453.93 8,769.33 7,826.63 9,207.80 8,199.32 9,646.26 8,572.02 10,084.73 68.90 148.40 22.00 531,000 7,465.89 8,783.40 7,839.18 9,222.57 8,212.48 9,661.74 8,585.77 10,100.91 69.03 148.68 22.00 532,000 7,477.85 8,797.47 7,851.74 9,237.34 8,225.63 9,677.22 8,599.53 10,117.09 69.16 148.96 22.00 533,000 7,489.81 8,811.54 7,864.30 9,252.12 8,238.79 9,692.69 8,613.28 10,133.27 69.29 149.24 22.00 534,000 7,501.77 8,825.61 7,876.86 9,266.89 8,251.95 9,708.17 8,627.03 10,149.45 69.42 149.52 22.00 535,000 7,513.73 8,839.68 7,889.41 9,281.66 8,265.10 9,723.65 8,640.79 10,165.63 69.55 149.80 22.00 536,000 7,525.69 8,853.75 7,901.97 9,296.44 8,278.26 9,739.13 8,654.54 10,181.81 69.68 150.08 22.00 537,000 7,537.65 8,867.82 7,914.53 9,311.21 8,291.41 9,754.60 8,668.29 10,197.99 69.81 150.36 22.00 538,000 7,549.61 8,881.89 7,927.09 9,325.98 8,304.57 9,770.08 8,682.05 10,214.17 69.94 150.64 22.00 539,000 7,561.57 8,895.96 7,939.64 9,340.76 8,317.72 9,785.56 8,695.80 10,230.35 70.07 150.92 22.00 540,000 7,573.53 8,910.03 7,952.20 9,355.53 8,330.88 9,801.03 8,709.55 10,246.53 70.20 151.20 22.00 541,000 7,585.49 8,924.10 7,964.76 9,370.31 8,344.03 9,816.51 8,723.31 10,262.72 70.33 151.48 22.00 542,000 7,597.44 8,938.17 7,977.32 9,385.08 8,357.19 9,831.99 8,737.06 10,278.90 70.46 151.76 22.00 543,000 7,609.40 8,952.24 7,989.87 9,399.85 8,370.34 9,847.46 8,750.81 10,295.08 70.59 152.04 22.00 544,000 7,621.36 8,966.31 8,002.43 9,414.63 8,383.50 9,862.94 8,764.57 10,311.26 70.72 152.32 22.00 545,000 7,633.32 8,980.38 8,014.99 9,429.40 8,396.66 9,878.42 8,778.32 10,327.44 70.85 152.60 22.00 546,000 7,645.28 8,994.45 8,027.55 9,444.17 8,409.81 9,893.90 8,792.07 10,343.62 70.98 152.88 22.00 547,000 7,657.24 9,008.52 8,040.10 9,458.95 8,422.97 9,909.37 8,805.83 10,359.80 71.11 153.16 22.00 548,000 7,669.20 9,022.59 8,052.66 9,473.72 8,436.12 9,924.85 8,819.58 10,375.98 71.24 153.44 22.00 549,000 7,681.16 9,036.66 8,065.22 9,488.49 8,449.28 9,940.33 8,833.34 10,392.16 71.37 153.72 22.00 550,000 7,693.12 9,050.73 8,077.78 9,503.27 8,462.43 9,955.80 8,847.09 10,408.34 71.50 154.00 22.00 551,000 7,705.08 9,064.80 8,090.33 9,518.04 8,475.59 9,971.28 8,860.84 10,424.52 71.63 154.28 23.00 552,000 7,717.04 9,078.87 8,102.89 9,532.81 8,488.74 9,986.76 8,874.60 10,440.70 71.76 154.56 23.00 553,000 7,729.00 9,092.94 8,115.45 9,547.59 8,501.90 10,002.23 8,888.35 10,456.88 71.89 154.84 23.00 554,000 7,740.96 9,107.01 8,128.01 9,562.36 8,515.05 10,017.71 8,902.10 10,473.06 72.02 155.12 23.00 555,000 7,752.92 9,121.08 8,140.56 9,577.13 8,528.21 10,033.19 8,915.86 10,489.24 72.15 155.40 23.00 556,000 7,764.88 9,135.15 8,153.12 9,591.91 8,541.37 10,048.67 8,929.61 10,505.42 72.28 155.68 23.00 557,000 7,776.84 9,149.22 8,165.68 9,606.68 8,554.52 10,064.14 8,943.36 10,521.60 72.41 155.96 23.00 558,000 7,788.80 9,163.29 8,178.24 9,621.45 8,567.68 10,079.62 8,957.12 10,537.78 72.54 156.24 23.00 559,000 7,800.76 9,177.36 8,190.79 9,636.23 8,580.83 10,095.10 8,970.87 10,553.96 72.67 156.52 23.00 46
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 560,000 7,812.72 9,191.43 8,203.35 9,651.00 8,593.99 10,110.57 8,984.62 10,570.14 72.80 156.80 23.00 561,000 7,824.68 9,205.50 8,215.91 9,665.78 8,607.14 10,126.05 8,998.38 10,586.33 72.93 157.08 23.00 562,000 7,836.63 9,219.57 8,228.47 9,680.55 8,620.30 10,141.53 9,012.13 10,602.51 73.06 157.36 23.00 563,000 7,848.59 9,233.64 8,241.02 9,695.32 8,633.45 10,157.00 9,025.88 10,618.69 73.19 157.64 23.00 564,000 7,860.55 9,247.71 8,253.58 9,710.10 8,646.61 10,172.48 9,039.64 10,634.87 73.32 157.92 23.00 565,000 7,872.51 9,261.78 8,266.14 9,724.87 8,659.76 10,187.96 9,053.39 10,651.05 73.45 158.20 23.00 566,000 7,884.47 9,275.85 8,278.70 9,739.64 8,672.92 10,203.44 9,067.14 10,667.23 73.58 158.48 23.00 567,000 7,896.43 9,289.92 8,291.25 9,754.42 8,686.08 10,218.91 9,080.90 10,683.41 73.71 158.76 23.00 568,000 7,908.39 9,303.99 8,303.81 9,769.19 8,699.23 10,234.39 9,094.65 10,699.59 73.84 159.04 23.00 569,000 7,920.35 9,318.06 8,316.37 9,783.96 8,712.39 10,249.87 9,108.40 10,715.77 73.97 159.32 23.00 570,000 7,932.31 9,332.13 8,328.93 9,798.74 8,725.54 10,265.34 9,122.16 10,731.95 74.10 159.60 23.00 571,000 7,944.27 9,346.20 8,341.48 9,813.51 8,738.70 10,280.82 9,135.91 10,748.13 74.23 159.88 23.00 572,000 7,956.23 9,360.27 8,354.04 9,828.28 8,751.85 10,296.30 9,149.66 10,764.31 74.36 160.16 23.00 573,000 7,968.19 9,374.34 8,366.60 9,843.06 8,765.01 10,311.77 9,163.42 10,780.49 74.49 160.44 23.00 574,000 7,980.15 9,388.41 8,379.16 9,857.83 8,778.16 10,327.25 9,177.17 10,796.67 74.62 160.72 23.00 575,000 7,992.11 9,402.48 8,391.71 9,872.60 8,791.32 10,342.73 9,190.92 10,812.85 74.75 161.00 23.00 576,000 8,004.07 9,416.55 8,404.27 9,887.38 8,804.47 10,358.21 9,204.68 10,829.03 74.88 161.28 24.00 577,000 8,016.03 9,430.62 8,416.83 9,902.15 8,817.63 10,373.68 9,218.43 10,845.21 75.01 161.56 24.00 578,000 8,027.99 9,444.69 8,429.39 9,916.92 8,830.79 10,389.16 9,232.18 10,861.39 75.14 161.84 24.00 579,000 8,039.95 9,458.76 8,441.94 9,931.70 8,843.94 10,404.64 9,245.94 10,877.57 75.27 162.12 24.00 580,000 8,051.91 9,472.83 8,454.50 9,946.47 8,857.10 10,420.11 9,259.69 10,893.75 75.40 162.40 24.00 581,000 8,063.87 9,486.90 8,467.06 9,961.25 8,870.25 10,435.59 9,273.44 10,909.94 75.53 162.68 24.00 582,000 8,075.82 9,500.97 8,479.62 9,976.02 8,883.41 10,451.07 9,287.20 10,926.12 75.66 162.96 24.00 583,000 8,087.78 9,515.04 8,492.17 9,990.79 8,896.56 10,466.54 9,300.95 10,942.30 75.79 163.24 24.00 584,000 8,099.74 9,529.11 8,504.73 10,005.57 8,909.72 10,482.02 9,314.71 10,958.48 75.92 163.52 24.00 585,000 8,111.70 9,543.18 8,517.29 10,020.34 8,922.87 10,497.50 9,328.46 10,974.66 76.05 163.80 24.00 586,000 8,123.66 9,557.25 8,529.85 10,035.11 8,936.03 10,512.98 9,342.21 10,990.84 76.18 164.08 24.00 587,000 8,135.62 9,571.32 8,542.40 10,049.89 8,949.18 10,528.45 9,355.97 11,007.02 76.31 164.36 24.00 588,000 8,147.58 9,585.39 8,554.96 10,064.66 8,962.34 10,543.93 9,369.72 11,023.20 76.44 164.64 24.00 589,000 8,159.54 9,599.46 8,567.52 10,079.43 8,975.50 10,559.41 9,383.47 11,039.38 76.57 164.92 24.00 590,000 8,171.50 9,613.53 8,580.08 10,094.21 8,988.65 10,574.88 9,397.23 11,055.56 76.70 165.20 24.00 591,000 8,183.46 9,627.60 8,592.63 10,108.98 9,001.81 10,590.36 9,410.98 11,071.74 76.83 165.48 24.00 592,000 8,195.42 9,641.67 8,605.19 10,123.75 9,014.96 10,605.84 9,424.73 11,087.92 76.96 165.76 24.00 593,000 8,207.38 9,655.74 8,617.75 10,138.53 9,028.12 10,621.31 9,438.49 11,104.10 77.09 166.04 24.00 594,000 8,219.34 9,669.81 8,630.31 10,153.30 9,041.27 10,636.79 9,452.24 11,120.28 77.22 166.32 24.00 595,000 8,231.30 9,683.88 8,642.86 10,168.07 9,054.43 10,652.27 9,465.99 11,136.46 77.35 166.60 24.00 596,000 8,243.26 9,697.95 8,655.42 10,182.85 9,067.58 10,667.75 9,479.75 11,152.64 77.48 166.88 24.00 597,000 8,255.22 9,712.02 8,667.98 10,197.62 9,080.74 10,683.22 9,493.50 11,168.82 77.61 167.16 24.00 598,000 8,267.18 9,726.09 8,680.54 10,212.39 9,093.89 10,698.70 9,507.25 11,185.00 77.74 167.44 24.00 599,000 8,279.14 9,740.16 8,693.09 10,227.17 9,107.05 10,714.18 9,521.01 11,201.18 77.87 167.72 24.00 47
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 600,000 8,291.10 9,754.23 8,705.65 10,241.94 9,120.21 10,729.65 9,534.76 11,217.36 78.00 168.00 24.00 601,000 8,303.06 9,768.30 8,718.21 10,256.72 9,133.36 10,745.13 9,548.51 11,233.55 78.13 168.28 25.00 602,000 8,315.01 9,782.37 8,730.77 10,271.49 9,146.52 10,760.61 9,562.27 11,249.73 78.26 168.56 25.00 603,000 8,326.97 9,796.44 8,743.32 10,286.26 9,159.67 10,776.08 9,576.02 11,265.91 78.39 168.84 25.00 604,000 8,338.93 9,810.51 8,755.88 10,301.04 9,172.83 10,791.56 9,589.77 11,282.09 78.52 169.12 25.00 605,000 8,350.89 9,824.58 8,768.44 10,315.81 9,185.98 10,807.04 9,603.53 11,298.27 78.65 169.40 25.00 606,000 8,362.85 9,838.65 8,781.00 10,330.58 9,199.14 10,822.52 9,617.28 11,314.45 78.78 169.68 25.00 607,000 8,374.81 9,852.72 8,793.55 10,345.36 9,212.29 10,837.99 9,631.03 11,330.63 78.91 169.96 25.00 608,000 8,386.77 9,866.79 8,806.11 10,360.13 9,225.45 10,853.47 9,644.79 11,346.81 79.04 170.24 25.00 609,000 8,398.73 9,880.86 8,818.67 10,374.90 9,238.60 10,868.95 9,658.54 11,362.99 79.17 170.52 25.00 610,000 8,410.69 9,894.93 8,831.23 10,389.68 9,251.76 10,884.42 9,672.29 11,379.17 79.30 170.80 25.00 611,000 8,422.65 9,909.00 8,843.78 10,404.45 9,264.92 10,899.90 9,686.05 11,395.35 79.43 171.08 25.00 612,000 8,434.61 9,923.07 8,856.34 10,419.22 9,278.07 10,915.38 9,699.80 11,411.53 79.56 171.36 25.00 613,000 8,446.57 9,937.14 8,868.90 10,434.00 9,291.23 10,930.85 9,713.55 11,427.71 79.69 171.64 25.00 614,000 8,458.53 9,951.21 8,881.45 10,448.77 9,304.38 10,946.33 9,727.31 11,443.89 79.82 171.92 25.00 615,000 8,470.49 9,965.28 8,894.01 10,463.54 9,317.54 10,961.81 9,741.06 11,460.07 79.95 172.20 25.00 616,000 8,482.45 9,979.35 8,906.57 10,478.32 9,330.69 10,977.29 9,754.81 11,476.25 80.08 172.48 25.00 617,000 8,494.41 9,993.42 8,919.13 10,493.09 9,343.85 10,992.76 9,768.57 11,492.43 80.21 172.76 25.00 618,000 8,506.37 10,007.49 8,931.68 10,507.86 9,357.00 11,008.24 9,782.32 11,508.61 80.34 173.04 25.00 619,000 8,518.33 10,021.56 8,944.24 10,522.64 9,370.16 11,023.72 9,796.07 11,524.79 80.47 173.32 25.00 620,000 8,530.29 10,035.63 8,956.80 10,537.41 9,383.31 11,039.19 9,809.83 11,540.97 80.60 173.60 25.00 621,000 8,542.25 10,049.70 8,969.36 10,552.19 9,396.47 11,054.67 9,823.58 11,557.16 80.73 173.88 25.00 622,000 8,554.20 10,063.77 8,981.91 10,566.96 9,409.62 11,070.15 9,837.34 11,573.34 80.86 174.16 25.00 623,000 8,566.16 10,077.84 8,994.47 10,581.73 9,422.78 11,085.62 9,851.09 11,589.52 80.99 174.44 25.00 624,000 8,578.12 10,091.91 9,007.03 10,596.51 9,435.94 11,101.10 9,864.84 11,605.70 81.12 174.72 25.00 625,000 8,590.08 10,105.98 9,019.59 10,611.28 9,449.09 11,116.58 9,878.60 11,621.88 81.25 175.00 25.00 626,000 8,602.04 10,120.05 9,032.14 10,626.05 9,462.25 11,132.06 9,892.35 11,638.06 81.38 175.28 26.00 627,000 8,614.00 10,134.12 9,044.70 10,640.83 9,475.40 11,147.53 9,906.10 11,654.24 81.51 175.56 26.00 628,000 8,625.96 10,148.19 9,057.26 10,655.60 9,488.56 11,163.01 9,919.86 11,670.42 81.64 175.84 26.00 629,000 8,637.92 10,162.26 9,069.82 10,670.37 9,501.71 11,178.49 9,933.61 11,686.60 81.77 176.12 26.00 630,000 8,649.88 10,176.33 9,082.37 10,685.15 9,514.87 11,193.96 9,947.36 11,702.78 81.90 176.40 26.00 631,000 8,661.84 10,190.40 9,094.93 10,699.92 9,528.02 11,209.44 9,961.12 11,718.96 82.03 176.68 26.00 632,000 8,673.80 10,204.47 9,107.49 10,714.69 9,541.18 11,224.92 9,974.87 11,735.14 82.16 176.96 26.00 633,000 8,685.76 10,218.54 9,120.05 10,729.47 9,554.33 11,240.39 9,988.62 11,751.32 82.29 177.24 26.00 634,000 8,697.72 10,232.61 9,132.60 10,744.24 9,567.49 11,255.87 10,002.38 11,767.50 82.42 177.52 26.00 635,000 8,709.68 10,246.68 9,145.16 10,759.01 9,580.65 11,271.35 10,016.13 11,783.68 82.55 177.80 26.00 636,000 8,721.64 10,260.75 9,157.72 10,773.79 9,593.80 11,286.83 10,029.88 11,799.86 82.68 178.08 26.00 637,000 8,733.60 10,274.82 9,170.28 10,788.56 9,606.96 11,302.30 10,043.64 11,816.04 82.81 178.36 26.00 638,000 8,745.56 10,288.89 9,182.83 10,803.33 9,620.11 11,317.78 10,057.39 11,832.22 82.94 178.64 26.00 639,000 8,757.52 10,302.96 9,195.39 10,818.11 9,633.27 11,333.26 10,071.14 11,848.40 83.07 178.92 26.00 48
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 640,000 8,769.48 10,317.03 9,207.95 10,832.88 9,646.42 11,348.73 10,084.90 11,864.58 83.20 179.20 26.00 641,000 8,781.44 10,331.10 9,220.51 10,847.66 9,659.58 11,364.21 10,098.65 11,880.77 83.33 179.48 26.00 642,000 8,793.39 10,345.17 9,233.06 10,862.43 9,672.73 11,379.69 10,112.40 11,896.95 83.46 179.76 26.00 643,000 8,805.35 10,359.24 9,245.62 10,877.20 9,685.89 11,395.16 10,126.16 11,913.13 83.59 180.04 26.00 644,000 8,817.31 10,373.31 9,258.18 10,891.98 9,699.04 11,410.64 10,139.91 11,929.31 83.72 180.32 26.00 645,000 8,829.27 10,387.38 9,270.74 10,906.75 9,712.20 11,426.12 10,153.66 11,945.49 83.85 180.60 26.00 646,000 8,841.23 10,401.45 9,283.29 10,921.52 9,725.36 11,441.60 10,167.42 11,961.67 83.98 180.88 26.00 647,000 8,853.19 10,415.52 9,295.85 10,936.30 9,738.51 11,457.07 10,181.17 11,977.85 84.11 181.16 26.00 648,000 8,865.15 10,429.59 9,308.41 10,951.07 9,751.67 11,472.55 10,194.92 11,994.03 84.24 181.44 26.00 649,000 8,877.11 10,443.66 9,320.97 10,965.84 9,764.82 11,488.03 10,208.68 12,010.21 84.37 181.72 26.00 650,000 8,889.07 10,457.73 9,333.52 10,980.62 9,777.98 11,503.50 10,222.43 12,026.39 84.50 182.00 26.00 651,000 8,901.03 10,471.80 9,346.08 10,995.39 9,791.13 11,518.98 10,236.18 12,042.57 84.63 182.28 27.00 652,000 8,912.99 10,485.87 9,358.64 11,010.16 9,804.29 11,534.46 10,249.94 12,058.75 84.76 182.56 27.00 653,000 8,924.95 10,499.94 9,371.20 11,024.94 9,817.44 11,549.93 10,263.69 12,074.93 84.89 182.84 27.00 654,000 8,936.91 10,514.01 9,383.75 11,039.71 9,830.60 11,565.41 10,277.44 12,091.11 85.02 183.12 27.00 655,000 8,948.87 10,528.08 9,396.31 11,054.48 9,843.75 11,580.89 10,291.20 12,107.29 85.15 183.40 27.00 656,000 8,960.83 10,542.15 9,408.87 11,069.26 9,856.91 11,596.37 10,304.95 12,123.47 85.28 183.68 27.00 657,000 8,972.79 10,556.22 9,421.43 11,084.03 9,870.07 11,611.84 10,318.71 12,139.65 85.41 183.96 27.00 658,000 8,984.75 10,570.29 9,433.98 11,098.80 9,883.22 11,627.32 10,332.46 12,155.83 85.54 184.24 27.00 659,000 8,996.71 10,584.36 9,446.54 11,113.58 9,896.38 11,642.80 10,346.21 12,172.01 85.67 184.52 27.00 660,000 9,008.67 10,598.43 9,459.10 11,128.35 9,909.53 11,658.27 10,359.97 12,188.19 85.80 184.80 27.00 661,000 9,020.63 10,612.50 9,471.66 11,143.13 9,922.69 11,673.75 10,373.72 12,204.38 85.93 185.08 27.00 662,000 9,032.58 10,626.57 9,484.21 11,157.90 9,935.84 11,689.23 10,387.47 12,220.56 86.06 185.36 27.00 663,000 9,044.54 10,640.64 9,496.77 11,172.67 9,949.00 11,704.70 10,401.23 12,236.74 86.19 185.64 27.00 664,000 9,056.50 10,654.71 9,509.33 11,187.45 9,962.15 11,720.18 10,414.98 12,252.92 86.32 185.92 27.00 665,000 9,068.46 10,668.78 9,521.89 11,202.22 9,975.31 11,735.66 10,428.73 12,269.10 86.45 186.20 27.00 666,000 9,080.42 10,682.85 9,534.44 11,216.99 9,988.46 11,751.14 10,442.49 12,285.28 86.58 186.48 27.00 667,000 9,092.38 10,696.92 9,547.00 11,231.77 10,001.62 11,766.61 10,456.24 12,301.46 86.71 186.76 27.00 668,000 9,104.34 10,710.99 9,559.56 11,246.54 10,014.78 11,782.09 10,469.99 12,317.64 86.84 187.04 27.00 669,000 9,116.30 10,725.06 9,572.12 11,261.31 10,027.93 11,797.57 10,483.75 12,333.82 86.97 187.32 27.00 670,000 9,128.26 10,739.13 9,584.67 11,276.09 10,041.09 11,813.04 10,497.50 12,350.00 87.10 187.60 27.00 671,000 9,140.22 10,753.20 9,597.23 11,290.86 10,054.24 11,828.52 10,511.25 12,366.18 87.23 187.88 27.00 672,000 9,152.18 10,767.27 9,609.79 11,305.63 10,067.40 11,844.00 10,525.01 12,382.36 87.36 188.16 27.00 673,000 9,164.14 10,781.34 9,622.35 11,320.41 10,080.55 11,859.47 10,538.76 12,398.54 87.49 188.44 27.00 674,000 9,176.10 10,795.41 9,634.90 11,335.18 10,093.71 11,874.95 10,552.51 12,414.72 87.62 188.72 27.00 675,000 9,188.06 10,809.48 9,647.46 11,349.95 10,106.86 11,890.43 10,566.27 12,430.90 87.75 189.00 27.00 676,000 9,200.02 10,823.55 9,660.02 11,364.73 10,120.02 11,905.91 10,580.02 12,447.08 87.88 189.28 28.00 677,000 9,211.98 10,837.62 9,672.58 11,379.50 10,133.17 11,921.38 10,593.77 12,463.26 88.01 189.56 28.00 678,000 9,223.94 10,851.69 9,685.13 11,394.27 10,146.33 11,936.86 10,607.53 12,479.44 88.14 189.84 28.00 679,000 9,235.90 10,865.76 9,697.69 11,409.05 10,159.49 11,952.34 10,621.28 12,495.62 88.27 190.12 28.00 49
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 680,000 9,247.86 10,879.83 9,710.25 11,423.82 10,172.64 11,967.81 10,635.03 12,511.80 88.40 190.40 28.00 681,000 9,259.82 10,893.90 9,722.81 11,438.60 10,185.80 11,983.29 10,648.79 12,527.99 88.53 190.68 28.00 682,000 9,271.77 10,907.97 9,735.36 11,453.37 10,198.95 11,998.77 10,662.54 12,544.17 88.66 190.96 28.00 683,000 9,283.73 10,922.04 9,747.92 11,468.14 10,212.11 12,014.24 10,676.29 12,560.35 88.79 191.24 28.00 684,000 9,295.69 10,936.11 9,760.48 11,482.92 10,225.26 12,029.72 10,690.05 12,576.53 88.92 191.52 28.00 685,000 9,307.65 10,950.18 9,773.04 11,497.69 10,238.42 12,045.20 10,703.80 12,592.71 89.05 191.80 28.00 686,000 9,319.61 10,964.25 9,785.59 11,512.46 10,251.57 12,060.68 10,717.55 12,608.89 89.18 192.08 28.00 687,000 9,331.57 10,978.32 9,798.15 11,527.24 10,264.73 12,076.15 10,731.31 12,625.07 89.31 192.36 28.00 688,000 9,343.53 10,992.39 9,810.71 11,542.01 10,277.88 12,091.63 10,745.06 12,641.25 89.44 192.64 28.00 689,000 9,355.49 11,006.46 9,823.27 11,556.78 10,291.04 12,107.11 10,758.81 12,657.43 89.57 192.92 28.00 690,000 9,367.45 11,020.53 9,835.82 11,571.56 10,304.20 12,122.58 10,772.57 12,673.61 89.70 193.20 28.00 691,000 9,379.41 11,034.60 9,848.38 11,586.33 10,317.35 12,138.06 10,786.32 12,689.79 89.83 193.48 28.00 692,000 9,391.37 11,048.67 9,860.94 11,601.10 10,330.51 12,153.54 10,800.07 12,705.97 89.96 193.76 28.00 693,000 9,403.33 11,062.74 9,873.50 11,615.88 10,343.66 12,169.01 10,813.83 12,722.15 90.09 194.04 28.00 694,000 9,415.29 11,076.81 9,886.05 11,630.65 10,356.82 12,184.49 10,827.58 12,738.33 90.22 194.32 28.00 695,000 9,427.25 11,090.88 9,898.61 11,645.42 10,369.97 12,199.97 10,841.34 12,754.51 90.35 194.60 28.00 696,000 9,439.21 11,104.95 9,911.17 11,660.20 10,383.13 12,215.45 10,855.09 12,770.69 90.48 194.88 28.00 697,000 9,451.17 11,119.02 9,923.73 11,674.97 10,396.28 12,230.92 10,868.84 12,786.87 90.61 195.16 28.00 698,000 9,463.13 11,133.09 9,936.28 11,689.74 10,409.44 12,246.40 10,882.60 12,803.05 90.74 195.44 28.00 699,000 9,475.09 11,147.16 9,948.84 11,704.52 10,422.59 12,261.88 10,896.35 12,819.23 90.87 195.72 28.00 700,000 9,487.05 11,161.23 9,961.40 11,719.29 10,435.75 12,277.35 10,910.10 12,835.41 91.00 196.00 28.00 701,000 9,499.01 11,175.30 9,973.96 11,734.07 10,448.91 12,292.83 10,923.86 12,851.60 91.13 196.28 29.00 702,000 9,510.96 11,189.37 9,986.51 11,748.84 10,462.06 12,308.31 10,937.61 12,867.78 91.26 196.56 29.00 703,000 9,522.92 11,203.44 9,999.07 11,763.61 10,475.22 12,323.78 10,951.36 12,883.96 91.39 196.84 29.00 704,000 9,534.88 11,217.51 10,011.63 11,778.39 10,488.37 12,339.26 10,965.12 12,900.14 91.52 197.12 29.00 705,000 9,546.84 11,231.58 10,024.19 11,793.16 10,501.53 12,354.74 10,978.87 12,916.32 91.65 197.40 29.00 706,000 9,558.80 11,245.65 10,036.74 11,807.93 10,514.68 12,370.22 10,992.62 12,932.50 91.78 197.68 29.00 707,000 9,570.76 11,259.72 10,049.30 11,822.71 10,527.84 12,385.69 11,006.38 12,948.68 91.91 197.96 29.00 708,000 9,582.72 11,273.79 10,061.86 11,837.48 10,540.99 12,401.17 11,020.13 12,964.86 92.04 198.24 29.00 709,000 9,594.68 11,287.86 10,074.42 11,852.25 10,554.15 12,416.65 11,033.88 12,981.04 92.17 198.52 29.00 710,000 9,606.64 11,301.93 10,086.97 11,867.03 10,567.30 12,432.12 11,047.64 12,997.22 92.30 198.80 29.00 711,000 9,618.60 11,316.00 10,099.53 11,881.80 10,580.46 12,447.60 11,061.39 13,013.40 92.43 199.08 29.00 712,000 9,630.56 11,330.07 10,112.09 11,896.57 10,593.62 12,463.08 11,075.14 13,029.58 92.56 199.36 29.00 713,000 9,642.52 11,344.14 10,124.64 11,911.35 10,606.77 12,478.55 11,088.90 13,045.76 92.69 199.64 29.00 714,000 9,654.48 11,358.21 10,137.20 11,926.12 10,619.93 12,494.03 11,102.65 13,061.94 92.82 199.92 29.00 715,000 9,666.44 11,372.28 10,149.76 11,940.89 10,633.08 12,509.51 11,116.40 13,078.12 92.95 200.20 29.00 716,000 9,678.40 11,386.35 10,162.32 11,955.67 10,646.24 12,524.99 11,130.16 13,094.30 93.08 200.48 29.00 717,000 9,690.36 11,400.42 10,174.87 11,970.44 10,659.39 12,540.46 11,143.91 13,110.48 93.21 200.76 29.00 718,000 9,702.32 11,414.49 10,187.43 11,985.21 10,672.55 12,555.94 11,157.66 13,126.66 93.34 201.04 29.00 719,000 9,714.28 11,428.56 10,199.99 11,999.99 10,685.70 12,571.42 11,171.42 13,142.84 93.47 201.32 29.00 50
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 720,000 9,726.24 11,442.63 10,212.55 12,014.76 10,698.86 12,586.89 11,185.17 13,159.02 93.60 201.60 29.00 721,000 9,738.20 11,456.70 10,225.10 12,029.54 10,712.01 12,602.37 11,198.92 13,175.21 93.73 201.88 29.00 722,000 9,750.15 11,470.77 10,237.66 12,044.31 10,725.17 12,617.85 11,212.68 13,191.39 93.86 202.16 29.00 723,000 9,762.11 11,484.84 10,250.22 12,059.08 10,738.33 12,633.32 11,226.43 13,207.57 93.99 202.44 29.00 724,000 9,774.07 11,498.91 10,262.78 12,073.86 10,751.48 12,648.80 11,240.18 13,223.75 94.12 202.72 29.00 725,000 9,786.03 11,512.98 10,275.33 12,088.63 10,764.64 12,664.28 11,253.94 13,239.93 94.25 203.00 29.00 726,000 9,797.99 11,527.05 10,287.89 12,103.40 10,777.79 12,679.76 11,267.69 13,256.11 94.38 203.28 30.00 727,000 9,809.95 11,541.12 10,300.45 12,118.18 10,790.95 12,695.23 11,281.44 13,272.29 94.51 203.56 30.00 728,000 9,821.91 11,555.19 10,313.01 12,132.95 10,804.10 12,710.71 11,295.20 13,288.47 94.64 203.84 30.00 729,000 9,833.87 11,569.26 10,325.56 12,147.72 10,817.26 12,726.19 11,308.95 13,304.65 94.77 204.12 30.00 730,000 9,845.83 11,583.33 10,338.12 12,162.50 10,830.41 12,741.66 11,322.71 13,320.83 94.90 204.40 30.00 731,000 9,857.79 11,597.40 10,350.68 12,177.27 10,843.57 12,757.14 11,336.46 13,337.01 95.03 204.68 30.00 732,000 9,869.75 11,611.47 10,363.24 12,192.04 10,856.72 12,772.62 11,350.21 13,353.19 95.16 204.96 30.00 733,000 9,881.71 11,625.54 10,375.79 12,206.82 10,869.88 12,788.09 11,363.97 13,369.37 95.29 205.24 30.00 734,000 9,893.67 11,639.61 10,388.35 12,221.59 10,883.04 12,803.57 11,377.72 13,385.55 95.42 205.52 30.00 735,000 9,905.63 11,653.68 10,400.91 12,236.36 10,896.19 12,819.05 11,391.47 13,401.73 95.55 205.80 30.00 736,000 9,917.59 11,667.75 10,413.47 12,251.14 10,909.35 12,834.53 11,405.23 13,417.91 95.68 206.08 30.00 737,000 9,929.55 11,681.82 10,426.02 12,265.91 10,922.50 12,850.00 11,418.98 13,434.09 95.81 206.36 30.00 738,000 9,941.51 11,695.89 10,438.58 12,280.68 10,935.66 12,865.48 11,432.73 13,450.27 95.94 206.64 30.00 739,000 9,953.47 11,709.96 10,451.14 12,295.46 10,948.81 12,880.96 11,446.49 13,466.45 96.07 206.92 30.00 740,000 9,965.43 11,724.03 10,463.70 12,310.23 10,961.97 12,896.43 11,460.24 13,482.63 96.20 207.20 30.00 741,000 9,977.39 11,738.10 10,476.25 12,325.01 10,975.12 12,911.91 11,473.99 13,498.82 96.33 207.48 30.00 742,000 9,989.34 11,752.17 10,488.81 12,339.78 10,988.28 12,927.39 11,487.75 13,515.00 96.46 207.76 30.00 743,000 10,001.30 11,766.24 10,501.37 12,354.55 11,001.43 12,942.86 11,501.50 13,531.18 96.59 208.04 30.00 744,000 10,013.26 11,780.31 10,513.93 12,369.33 11,014.59 12,958.34 11,515.25 13,547.36 96.72 208.32 30.00 745,000 10,025.22 11,794.38 10,526.48 12,384.10 11,027.75 12,973.82 11,529.01 13,563.54 96.85 208.60 30.00 746,000 10,037.18 11,808.45 10,539.04 12,398.87 11,040.90 12,989.30 11,542.76 13,579.72 96.98 208.88 30.00 747,000 10,049.14 11,822.52 10,551.60 12,413.65 11,054.06 13,004.77 11,556.51 13,595.90 97.11 209.16 30.00 748,000 10,061.10 11,836.59 10,564.16 12,428.42 11,067.21 13,020.25 11,570.27 13,612.08 97.24 209.44 30.00 749,000 10,073.06 11,850.66 10,576.71 12,443.19 11,080.37 13,035.73 11,584.02 13,628.26 97.37 209.72 30.00 750,000 10,085.02 11,864.73 10,589.27 12,457.97 11,093.52 13,051.20 11,597.77 13,644.44 97.50 210.00 30.00 751,000 10,096.98 11,878.80 10,601.83 12,472.74 11,106.68 13,066.68 11,611.53 13,660.62 97.63 210.28 31.00 752,000 10,108.94 11,892.87 10,614.39 12,487.51 11,119.83 13,082.16 11,625.28 13,676.80 97.76 210.56 31.00 753,000 10,120.90 11,906.94 10,626.94 12,502.29 11,132.99 13,097.63 11,639.03 13,692.98 97.89 210.84 31.00 754,000 10,132.86 11,921.01 10,639.50 12,517.06 11,146.14 13,113.11 11,652.79 13,709.16 98.02 211.12 31.00 755,000 10,144.82 11,935.08 10,652.06 12,531.83 11,159.30 13,128.59 11,666.54 13,725.34 98.15 211.40 31.00 756,000 10,156.78 11,949.15 10,664.62 12,546.61 11,172.46 13,144.07 11,680.29 13,741.52 98.28 211.68 31.00 757,000 10,168.74 11,963.22 10,677.17 12,561.38 11,185.61 13,159.54 11,694.05 13,757.70 98.41 211.96 31.00 758,000 10,180.70 11,977.29 10,689.73 12,576.15 11,198.77 13,175.02 11,707.80 13,773.88 98.54 212.24 31.00 759,000 10,192.66 11,991.36 10,702.29 12,590.93 11,211.92 13,190.50 11,721.55 13,790.06 98.67 212.52 31.00 51
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 760,000 10,204.62 12,005.43 10,714.85 12,605.70 11,225.08 13,205.97 11,735.31 13,806.24 98.80 212.80 31.00 761,000 10,216.58 12,019.50 10,727.40 12,620.48 11,238.23 13,221.45 11,749.06 13,822.43 98.93 213.08 31.00 762,000 10,228.53 12,033.57 10,739.96 12,635.25 11,251.39 13,236.93 11,762.81 13,838.61 99.06 213.36 31.00 763,000 10,240.49 12,047.64 10,752.52 12,650.02 11,264.54 13,252.40 11,776.57 13,854.79 99.19 213.64 31.00 764,000 10,252.45 12,061.71 10,765.08 12,664.80 11,277.70 13,267.88 11,790.32 13,870.97 99.32 213.92 31.00 765,000 10,264.41 12,075.78 10,777.63 12,679.57 11,290.85 13,283.36 11,804.07 13,887.15 99.45 214.20 31.00 766,000 10,276.37 12,089.85 10,790.19 12,694.34 11,304.01 13,298.84 11,817.83 13,903.33 99.58 214.48 31.00 767,000 10,288.33 12,103.92 10,802.75 12,709.12 11,317.17 13,314.31 11,831.58 13,919.51 99.71 214.76 31.00 768,000 10,300.29 12,117.99 10,815.31 12,723.89 11,330.32 13,329.79 11,845.34 13,935.69 99.84 215.04 31.00 769,000 10,312.25 12,132.06 10,827.86 12,738.66 11,343.48 13,345.27 11,859.09 13,951.87 99.97 215.32 31.00 770,000 10,324.21 12,146.13 10,840.42 12,753.44 11,356.63 13,360.74 11,872.84 13,968.05 100.10 215.60 31.00 771,000 10,336.17 12,160.20 10,852.98 12,768.21 11,369.79 13,376.22 11,886.60 13,984.23 100.23 215.88 31.00 772,000 10,348.13 12,174.27 10,865.54 12,782.98 11,382.94 13,391.70 11,900.35 14,000.41 100.36 216.16 31.00 773,000 10,360.09 12,188.34 10,878.09 12,797.76 11,396.10 13,407.17 11,914.10 14,016.59 100.49 216.44 31.00 774,000 10,372.05 12,202.41 10,890.65 12,812.53 11,409.25 13,422.65 11,927.86 14,032.77 100.62 216.72 31.00 775,000 10,384.01 12,216.48 10,903.21 12,827.30 11,422.41 13,438.13 11,941.61 14,048.95 100.75 217.00 31.00 776,000 10,395.97 12,230.55 10,915.77 12,842.08 11,435.56 13,453.61 11,955.36 14,065.13 100.88 217.28 32.00 777,000 10,407.93 12,244.62 10,928.32 12,856.85 11,448.72 13,469.08 11,969.12 14,081.31 101.01 217.56 32.00 778,000 10,419.89 12,258.69 10,940.88 12,871.62 11,461.88 13,484.56 11,982.87 14,097.49 101.14 217.84 32.00 779,000 10,431.85 12,272.76 10,953.44 12,886.40 11,475.03 13,500.04 11,996.62 14,113.67 101.27 218.12 32.00 780,000 10,443.81 12,286.83 10,966.00 12,901.17 11,488.19 13,515.51 12,010.38 14,129.85 101.40 218.40 32.00 781,000 10,455.77 12,300.90 10,978.55 12,915.95 11,501.34 13,530.99 12,024.13 14,146.04 101.53 218.68 32.00 782,000 10,467.72 12,314.97 10,991.11 12,930.72 11,514.50 13,546.47 12,037.88 14,162.22 101.66 218.96 32.00 783,000 10,479.68 12,329.04 11,003.67 12,945.49 11,527.65 13,561.94 12,051.64 14,178.40 101.79 219.24 32.00 784,000 10,491.64 12,343.11 11,016.23 12,960.27 11,540.81 13,577.42 12,065.39 14,194.58 101.92 219.52 32.00 785,000 10,503.60 12,357.18 11,028.78 12,975.04 11,553.96 13,592.90 12,079.14 14,210.76 102.05 219.80 32.00 786,000 10,515.56 12,371.25 11,041.34 12,989.81 11,567.12 13,608.38 12,092.90 14,226.94 102.18 220.08 32.00 787,000 10,527.52 12,385.32 11,053.90 13,004.59 11,580.27 13,623.85 12,106.65 14,243.12 102.31 220.36 32.00 788,000 10,539.48 12,399.39 11,066.46 13,019.36 11,593.43 13,639.33 12,120.40 14,259.30 102.44 220.64 32.00 789,000 10,551.44 12,413.46 11,079.01 13,034.13 11,606.59 13,654.81 12,134.16 14,275.48 102.57 220.92 32.00 790,000 10,563.40 12,427.53 11,091.57 13,048.91 11,619.74 13,670.28 12,147.91 14,291.66 102.70 221.20 32.00 791,000 10,575.36 12,441.60 11,104.13 13,063.68 11,632.90 13,685.76 12,161.66 14,307.84 102.83 221.48 32.00 792,000 10,587.32 12,455.67 11,116.69 13,078.45 11,646.05 13,701.24 12,175.42 14,324.02 102.96 221.76 32.00 793,000 10,599.28 12,469.74 11,129.24 13,093.23 11,659.21 13,716.71 12,189.17 14,340.20 103.09 222.04 32.00 794,000 10,611.24 12,483.81 11,141.80 13,108.00 11,672.36 13,732.19 12,202.92 14,356.38 103.22 222.32 32.00 795,000 10,623.20 12,497.88 11,154.36 13,122.77 11,685.52 13,747.67 12,216.68 14,372.56 103.35 222.60 32.00 796,000 10,635.16 12,511.95 11,166.92 13,137.55 11,698.67 13,763.15 12,230.43 14,388.74 103.48 222.88 32.00 797,000 10,647.12 12,526.02 11,179.47 13,152.32 11,711.83 13,778.62 12,244.18 14,404.92 103.61 223.16 32.00 798,000 10,659.08 12,540.09 11,192.03 13,167.09 11,724.98 13,794.10 12,257.94 14,421.10 103.74 223.44 32.00 799,000 10,671.04 12,554.16 11,204.59 13,181.87 11,738.14 13,809.58 12,271.69 14,437.28 103.87 223.72 32.00 52
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 800,000 10,683.00 12,568.23 11,217.15 13,196.64 11,751.30 13,825.05 12,285.44 14,453.46 104.00 224.00 32.00 801,000 10,694.96 12,582.30 11,229.70 13,211.42 11,764.45 13,840.53 12,299.20 14,469.65 104.13 224.28 33.00 802,000 10,706.91 12,596.37 11,242.26 13,226.19 11,777.61 13,856.01 12,312.95 14,485.83 104.26 224.56 33.00 803,000 10,718.87 12,610.44 11,254.82 13,240.96 11,790.76 13,871.48 12,326.71 14,502.01 104.39 224.84 33.00 804,000 10,730.83 12,624.51 11,267.38 13,255.74 11,803.92 13,886.96 12,340.46 14,518.19 104.52 225.12 33.00 805,000 10,742.79 12,638.58 11,279.93 13,270.51 11,817.07 13,902.44 12,354.21 14,534.37 104.65 225.40 33.00 806,000 10,754.75 12,652.65 11,292.49 13,285.28 11,830.23 13,917.92 12,367.97 14,550.55 104.78 225.68 33.00 807,000 10,766.71 12,666.72 11,305.05 13,300.06 11,843.38 13,933.39 12,381.72 14,566.73 104.91 225.96 33.00 808,000 10,778.67 12,680.79 11,317.61 13,314.83 11,856.54 13,948.87 12,395.47 14,582.91 105.04 226.24 33.00 809,000 10,790.63 12,694.86 11,330.16 13,329.60 11,869.69 13,964.35 12,409.23 14,599.09 105.17 226.52 33.00 810,000 10,802.59 12,708.93 11,342.72 13,344.38 11,882.85 13,979.82 12,422.98 14,615.27 105.30 226.80 33.00 811,000 10,814.55 12,723.00 11,355.28 13,359.15 11,896.01 13,995.30 12,436.73 14,631.45 105.43 227.08 33.00 812,000 10,826.51 12,737.07 11,367.83 13,373.92 11,909.16 14,010.78 12,450.49 14,647.63 105.56 227.36 33.00 813,000 10,838.47 12,751.14 11,380.39 13,388.70 11,922.32 14,026.25 12,464.24 14,663.81 105.69 227.64 33.00 814,000 10,850.43 12,765.21 11,392.95 13,403.47 11,935.47 14,041.73 12,477.99 14,679.99 105.82 227.92 33.00 815,000 10,862.39 12,779.28 11,405.51 13,418.24 11,948.63 14,057.21 12,491.75 14,696.17 105.95 228.20 33.00 816,000 10,874.35 12,793.35 11,418.06 13,433.02 11,961.78 14,072.69 12,505.50 14,712.35 106.08 228.48 33.00 817,000 10,886.31 12,807.42 11,430.62 13,447.79 11,974.94 14,088.16 12,519.25 14,728.53 106.21 228.76 33.00 818,000 10,898.27 12,821.49 11,443.18 13,462.56 11,988.09 14,103.64 12,533.01 14,744.71 106.34 229.04 33.00 819,000 10,910.23 12,835.56 11,455.74 13,477.34 12,001.25 14,119.12 12,546.76 14,760.89 106.47 229.32 33.00 820,000 10,922.19 12,849.63 11,468.29 13,492.11 12,014.40 14,134.59 12,560.51 14,777.07 106.60 229.60 33.00 821,000 10,934.15 12,863.70 11,480.85 13,506.89 12,027.56 14,150.07 12,574.27 14,793.26 106.73 229.88 33.00 822,000 10,946.10 12,877.77 11,493.41 13,521.66 12,040.71 14,165.55 12,588.02 14,809.44 106.86 230.16 33.00 823,000 10,958.06 12,891.84 11,505.97 13,536.43 12,053.87 14,181.02 12,601.77 14,825.62 106.99 230.44 33.00 824,000 10,970.02 12,905.91 11,518.52 13,551.21 12,067.03 14,196.50 12,615.53 14,841.80 107.12 230.72 33.00 825,000 10,981.98 12,919.98 11,531.08 13,565.98 12,080.18 14,211.98 12,629.28 14,857.98 107.25 231.00 33.00 826,000 10,993.94 12,934.05 11,543.64 13,580.75 12,093.34 14,227.46 12,643.03 14,874.16 107.38 231.28 34.00 827,000 11,005.90 12,948.12 11,556.20 13,595.53 12,106.49 14,242.93 12,656.79 14,890.34 107.51 231.56 34.00 828,000 11,017.86 12,962.19 11,568.75 13,610.30 12,119.65 14,258.41 12,670.54 14,906.52 107.64 231.84 34.00 829,000 11,029.82 12,976.26 11,581.31 13,625.07 12,132.80 14,273.89 12,684.29 14,922.70 107.77 232.12 34.00 830,000 11,041.78 12,990.33 11,593.87 13,639.85 12,145.96 14,289.36 12,698.05 14,938.88 107.90 232.40 34.00 831,000 11,053.74 13,004.40 11,606.43 13,654.62 12,159.11 14,304.84 12,711.80 14,955.06 108.03 232.68 34.00 832,000 11,065.70 13,018.47 11,618.98 13,669.39 12,172.27 14,320.32 12,725.55 14,971.24 108.16 232.96 34.00 833,000 11,077.66 13,032.54 11,631.54 13,684.17 12,185.42 14,335.79 12,739.31 14,987.42 108.29 233.24 34.00 834,000 11,089.62 13,046.61 11,644.10 13,698.94 12,198.58 14,351.27 12,753.06 15,003.60 108.42 233.52 34.00 835,000 11,101.58 13,060.68 11,656.66 13,713.71 12,211.74 14,366.75 12,766.81 15,019.78 108.55 233.80 34.00 836,000 11,113.54 13,074.75 11,669.21 13,728.49 12,224.89 14,382.23 12,780.57 15,035.96 108.68 234.08 34.00 837,000 11,125.50 13,088.82 11,681.77 13,743.26 12,238.05 14,397.70 12,794.32 15,052.14 108.81 234.36 34.00 838,000 11,137.46 13,102.89 11,694.33 13,758.03 12,251.20 14,413.18 12,808.07 15,068.32 108.94 234.64 34.00 839,000 11,149.42 13,116.96 11,706.89 13,772.81 12,264.36 14,428.66 12,821.83 15,084.50 109.07 234.92 34.00 53
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 840,000 11,161.38 13,131.03 11,719.44 13,787.58 12,277.51 14,444.13 12,835.58 15,100.68 109.20 235.20 34.00 841,000 11,173.34 13,145.10 11,732.00 13,802.36 12,290.67 14,459.61 12,849.34 15,116.87 109.33 235.48 34.00 842,000 11,185.29 13,159.17 11,744.56 13,817.13 12,303.82 14,475.09 12,863.09 15,133.05 109.46 235.76 34.00 843,000 11,197.25 13,173.24 11,757.12 13,831.90 12,316.98 14,490.56 12,876.84 15,149.23 109.59 236.04 34.00 844,000 11,209.21 13,187.31 11,769.67 13,846.68 12,330.13 14,506.04 12,890.60 15,165.41 109.72 236.32 34.00 845,000 11,221.17 13,201.38 11,782.23 13,861.45 12,343.29 14,521.52 12,904.35 15,181.59 109.85 236.60 34.00 846,000 11,233.13 13,215.45 11,794.79 13,876.22 12,356.45 14,537.00 12,918.10 15,197.77 109.98 236.88 34.00 847,000 11,245.09 13,229.52 11,807.35 13,891.00 12,369.60 14,552.47 12,931.86 15,213.95 110.11 237.16 34.00 848,000 11,257.05 13,243.59 11,819.90 13,905.77 12,382.76 14,567.95 12,945.61 15,230.13 110.24 237.44 34.00 849,000 11,269.01 13,257.66 11,832.46 13,920.54 12,395.91 14,583.43 12,959.36 15,246.31 110.37 237.72 34.00 850,000 11,280.97 13,271.73 11,845.02 13,935.32 12,409.07 14,598.90 12,973.12 15,262.49 110.50 238.00 34.00 851,000 11,292.93 13,285.80 11,857.58 13,950.09 12,422.22 14,614.38 12,986.87 15,278.67 110.63 238.28 35.00 852,000 11,304.89 13,299.87 11,870.13 13,964.86 12,435.38 14,629.86 13,000.62 15,294.85 110.76 238.56 35.00 853,000 11,316.85 13,313.94 11,882.69 13,979.64 12,448.53 14,645.33 13,014.38 15,311.03 110.89 238.84 35.00 854,000 11,328.81 13,328.01 11,895.25 13,994.41 12,461.69 14,660.81 13,028.13 15,327.21 111.02 239.12 35.00 855,000 11,340.77 13,342.08 11,907.81 14,009.18 12,474.84 14,676.29 13,041.88 15,343.39 111.15 239.40 35.00 856,000 11,352.73 13,356.15 11,920.36 14,023.96 12,488.00 14,691.77 13,055.64 15,359.57 111.28 239.68 35.00 857,000 11,364.69 13,370.22 11,932.92 14,038.73 12,501.16 14,707.24 13,069.39 15,375.75 111.41 239.96 35.00 858,000 11,376.65 13,384.29 11,945.48 14,053.50 12,514.31 14,722.72 13,083.14 15,391.93 111.54 240.24 35.00 859,000 11,388.61 13,398.36 11,958.04 14,068.28 12,527.47 14,738.20 13,096.90 15,408.11 111.67 240.52 35.00 860,000 11,400.57 13,412.43 11,970.59 14,083.05 12,540.62 14,753.67 13,110.65 15,424.29 111.80 240.80 35.00 861,000 11,412.53 13,426.50 11,983.15 14,097.83 12,553.78 14,769.15 13,124.40 15,440.48 111.93 241.08 35.00 862,000 11,424.48 13,440.57 11,995.71 14,112.60 12,566.93 14,784.63 13,138.16 15,456.66 112.06 241.36 35.00 863,000 11,436.44 13,454.64 12,008.27 14,127.37 12,580.09 14,800.10 13,151.91 15,472.84 112.19 241.64 35.00 864,000 11,448.40 13,468.71 12,020.82 14,142.15 12,593.24 14,815.58 13,165.66 15,489.02 112.32 241.92 35.00 865,000 11,460.36 13,482.78 12,033.38 14,156.92 12,606.40 14,831.06 13,179.42 15,505.20 112.45 242.20 35.00 866,000 11,472.32 13,496.85 12,045.94 14,171.69 12,619.55 14,846.54 13,193.17 15,521.38 112.58 242.48 35.00 867,000 11,484.28 13,510.92 12,058.50 14,186.47 12,632.71 14,862.01 13,206.92 15,537.56 112.71 242.76 35.00 868,000 11,496.24 13,524.99 12,071.05 14,201.24 12,645.87 14,877.49 13,220.68 15,553.74 112.84 243.04 35.00 869,000 11,508.20 13,539.06 12,083.61 14,216.01 12,659.02 14,892.97 13,234.43 15,569.92 112.97 243.32 35.00 870,000 11,520.16 13,553.13 12,096.17 14,230.79 12,672.18 14,908.44 13,248.18 15,586.10 113.10 243.60 35.00 871,000 11,532.12 13,567.20 12,108.73 14,245.56 12,685.33 14,923.92 13,261.94 15,602.28 113.23 243.88 35.00 872,000 11,544.08 13,581.27 12,121.28 14,260.33 12,698.49 14,939.40 13,275.69 15,618.46 113.36 244.16 35.00 873,000 11,556.04 13,595.34 12,133.84 14,275.11 12,711.64 14,954.87 13,289.44 15,634.64 113.49 244.44 35.00 874,000 11,568.00 13,609.41 12,146.40 14,289.88 12,724.80 14,970.35 13,303.20 15,650.82 113.62 244.72 35.00 875,000 11,579.96 13,623.48 12,158.96 14,304.65 12,737.95 14,985.83 13,316.95 15,667.00 113.75 245.00 35.00 876,000 11,591.92 13,637.55 12,171.51 14,319.43 12,751.11 15,001.31 13,330.71 15,683.18 113.88 245.28 36.00 877,000 11,603.88 13,651.62 12,184.07 14,334.20 12,764.26 15,016.78 13,344.46 15,699.36 114.01 245.56 36.00 878,000 11,615.84 13,665.69 12,196.63 14,348.97 12,777.42 15,032.26 13,358.21 15,715.54 114.14 245.84 36.00 879,000 11,627.80 13,679.76 12,209.19 14,363.75 12,790.58 15,047.74 13,371.97 15,731.72 114.27 246.12 36.00 54
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 880,000 11,639.76 13,693.83 12,221.74 14,378.52 12,803.73 15,063.21 13,385.72 15,747.90 114.40 246.40 36.00 881,000 11,651.72 13,707.90 12,234.30 14,393.30 12,816.89 15,078.69 13,399.47 15,764.09 114.53 246.68 36.00 882,000 11,663.67 13,721.97 12,246.86 14,408.07 12,830.04 15,094.17 13,413.23 15,780.27 114.66 246.96 36.00 883,000 11,675.63 13,736.04 12,259.42 14,422.84 12,843.20 15,109.64 13,426.98 15,796.45 114.79 247.24 36.00 884,000 11,687.59 13,750.11 12,271.97 14,437.62 12,856.35 15,125.12 13,440.73 15,812.63 114.92 247.52 36.00 885,000 11,699.55 13,764.18 12,284.53 14,452.39 12,869.51 15,140.60 13,454.49 15,828.81 115.05 247.80 36.00 886,000 11,711.51 13,778.25 12,297.09 14,467.16 12,882.66 15,156.08 13,468.24 15,844.99 115.18 248.08 36.00 887,000 11,723.47 13,792.32 12,309.65 14,481.94 12,895.82 15,171.55 13,481.99 15,861.17 115.31 248.36 36.00 888,000 11,735.43 13,806.39 12,322.20 14,496.71 12,908.97 15,187.03 13,495.75 15,877.35 115.44 248.64 36.00 889,000 11,747.39 13,820.46 12,334.76 14,511.48 12,922.13 15,202.51 13,509.50 15,893.53 115.57 248.92 36.00 890,000 11,759.35 13,834.53 12,347.32 14,526.26 12,935.29 15,217.98 13,523.25 15,909.71 115.70 249.20 36.00 891,000 11,771.31 13,848.60 12,359.88 14,541.03 12,948.44 15,233.46 13,537.01 15,925.89 115.83 249.48 36.00 892,000 11,783.27 13,862.67 12,372.43 14,555.80 12,961.60 15,248.94 13,550.76 15,942.07 115.96 249.76 36.00 893,000 11,795.23 13,876.74 12,384.99 14,570.58 12,974.75 15,264.41 13,564.51 15,958.25 116.09 250.04 36.00 894,000 11,807.19 13,890.81 12,397.55 14,585.35 12,987.91 15,279.89 13,578.27 15,974.43 116.22 250.32 36.00 895,000 11,819.15 13,904.88 12,410.11 14,600.12 13,001.06 15,295.37 13,592.02 15,990.61 116.35 250.60 36.00 896,000 11,831.11 13,918.95 12,422.66 14,614.90 13,014.22 15,310.85 13,605.77 16,006.79 116.48 250.88 36.00 897,000 11,843.07 13,933.02 12,435.22 14,629.67 13,027.37 15,326.32 13,619.53 16,022.97 116.61 251.16 36.00 898,000 11,855.03 13,947.09 12,447.78 14,644.44 13,040.53 15,341.80 13,633.28 16,039.15 116.74 251.44 36.00 899,000 11,866.99 13,961.16 12,460.34 14,659.22 13,053.68 15,357.28 13,647.03 16,055.33 116.87 251.72 36.00 900,000 11,878.95 13,975.23 12,472.89 14,673.99 13,066.84 15,372.75 13,660.79 16,071.51 117.00 252.00 36.00 901,000 11,890.91 13,989.30 12,485.45 14,688.77 13,080.00 15,388.23 13,674.54 16,087.70 117.13 252.28 37.00 902,000 11,902.86 14,003.37 12,498.01 14,703.54 13,093.15 15,403.71 13,688.29 16,103.88 117.26 252.56 37.00 903,000 11,914.82 14,017.44 12,510.57 14,718.31 13,106.31 15,419.18 13,702.05 16,120.06 117.39 252.84 37.00 904,000 11,926.78 14,031.51 12,523.12 14,733.09 13,119.46 15,434.66 13,715.80 16,136.24 117.52 253.12 37.00 905,000 11,938.74 14,045.58 12,535.68 14,747.86 13,132.62 15,450.14 13,729.55 16,152.42 117.65 253.40 37.00 906,000 11,950.70 14,059.65 12,548.24 14,762.63 13,145.77 15,465.62 13,743.31 16,168.60 117.78 253.68 37.00 907,000 11,962.66 14,073.72 12,560.80 14,777.41 13,158.93 15,481.09 13,757.06 16,184.78 117.91 253.96 37.00 908,000 11,974.62 14,087.79 12,573.35 14,792.18 13,172.08 15,496.57 13,770.81 16,200.96 118.04 254.24 37.00 909,000 11,986.58 14,101.86 12,585.91 14,806.95 13,185.24 15,512.05 13,784.57 16,217.14 118.17 254.52 37.00 910,000 11,998.54 14,115.93 12,598.47 14,821.73 13,198.39 15,527.52 13,798.32 16,233.32 118.30 254.80 37.00 911,000 12,010.50 14,130.00 12,611.03 14,836.50 13,211.55 15,543.00 13,812.08 16,249.50 118.43 255.08 37.00 912,000 12,022.46 14,144.07 12,623.58 14,851.27 13,224.71 15,558.48 13,825.83 16,265.68 118.56 255.36 37.00 913,000 12,034.42 14,158.14 12,636.14 14,866.05 13,237.86 15,573.95 13,839.58 16,281.86 118.69 255.64 37.00 914,000 12,046.38 14,172.21 12,648.70 14,880.82 13,251.02 15,589.43 13,853.34 16,298.04 118.82 255.92 37.00 915,000 12,058.34 14,186.28 12,661.25 14,895.59 13,264.17 15,604.91 13,867.09 16,314.22 118.95 256.20 37.00 916,000 12,070.30 14,200.35 12,673.81 14,910.37 13,277.33 15,620.39 13,880.84 16,330.40 119.08 256.48 37.00 917,000 12,082.26 14,214.42 12,686.37 14,925.14 13,290.48 15,635.86 13,894.60 16,346.58 119.21 256.76 37.00 918,000 12,094.22 14,228.49 12,698.93 14,939.91 13,303.64 15,651.34 13,908.35 16,362.76 119.34 257.04 37.00 919,000 12,106.18 14,242.56 12,711.48 14,954.69 13,316.79 15,666.82 13,922.10 16,378.94 119.47 257.32 37.00 55
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 920,000 12,118.14 14,256.63 12,724.04 14,969.46 13,329.95 15,682.29 13,935.86 16,395.12 119.60 257.60 37.00 921,000 12,130.10 14,270.70 12,736.60 14,984.24 13,343.10 15,697.77 13,949.61 16,411.31 119.73 257.88 37.00 922,000 12,142.05 14,284.77 12,749.16 14,999.01 13,356.26 15,713.25 13,963.36 16,427.49 119.86 258.16 37.00 923,000 12,154.01 14,298.84 12,761.71 15,013.78 13,369.42 15,728.72 13,977.12 16,443.67 119.99 258.44 37.00 924,000 12,165.97 14,312.91 12,774.27 15,028.56 13,382.57 15,744.20 13,990.87 16,459.85 120.12 258.72 37.00 925,000 12,177.93 14,326.98 12,786.83 15,043.33 13,395.73 15,759.68 14,004.62 16,476.03 120.25 259.00 37.00 926,000 12,189.89 14,341.05 12,799.39 15,058.10 13,408.88 15,775.16 14,018.38 16,492.21 120.38 259.28 38.00 927,000 12,201.85 14,355.12 12,811.94 15,072.88 13,422.04 15,790.63 14,032.13 16,508.39 120.51 259.56 38.00 928,000 12,213.81 14,369.19 12,824.50 15,087.65 13,435.19 15,806.11 14,045.88 16,524.57 120.64 259.84 38.00 929,000 12,225.77 14,383.26 12,837.06 15,102.42 13,448.35 15,821.59 14,059.64 16,540.75 120.77 260.12 38.00 930,000 12,237.73 14,397.33 12,849.62 15,117.20 13,461.50 15,837.06 14,073.39 16,556.93 120.90 260.40 38.00 931,000 12,249.69 14,411.40 12,862.17 15,131.97 13,474.66 15,852.54 14,087.14 16,573.11 121.03 260.68 38.00 932,000 12,261.65 14,425.47 12,874.73 15,146.74 13,487.81 15,868.02 14,100.90 16,589.29 121.16 260.96 38.00 933,000 12,273.61 14,439.54 12,887.29 15,161.52 13,500.97 15,883.49 14,114.65 16,605.47 121.29 261.24 38.00 934,000 12,285.57 14,453.61 12,899.85 15,176.29 13,514.13 15,898.97 14,128.40 16,621.65 121.42 261.52 38.00 935,000 12,297.53 14,467.68 12,912.40 15,191.06 13,527.28 15,914.45 14,142.16 16,637.83 121.55 261.80 38.00 936,000 12,309.49 14,481.75 12,924.96 15,205.84 13,540.44 15,929.93 14,155.91 16,654.01 121.68 262.08 38.00 937,000 12,321.45 14,495.82 12,937.52 15,220.61 13,553.59 15,945.40 14,169.66 16,670.19 121.81 262.36 38.00 938,000 12,333.41 14,509.89 12,950.08 15,235.38 13,566.75 15,960.88 14,183.42 16,686.37 121.94 262.64 38.00 939,000 12,345.37 14,523.96 12,962.63 15,250.16 13,579.90 15,976.36 14,197.17 16,702.55 122.07 262.92 38.00 940,000 12,357.33 14,538.03 12,975.19 15,264.93 13,593.06 15,991.83 14,210.92 16,718.73 122.20 263.20 38.00 941,000 12,369.29 14,552.10 12,987.75 15,279.71 13,606.21 16,007.31 14,224.68 16,734.92 122.33 263.48 38.00 942,000 12,381.24 14,566.17 13,000.31 15,294.48 13,619.37 16,022.79 14,238.43 16,751.10 122.46 263.76 38.00 943,000 12,393.20 14,580.24 13,012.86 15,309.25 13,632.52 16,038.26 14,252.18 16,767.28 122.59 264.04 38.00 944,000 12,405.16 14,594.31 13,025.42 15,324.03 13,645.68 16,053.74 14,265.94 16,783.46 122.72 264.32 38.00 945,000 12,417.12 14,608.38 13,037.98 15,338.80 13,658.84 16,069.22 14,279.69 16,799.64 122.85 264.60 38.00 946,000 12,429.08 14,622.45 13,050.54 15,353.57 13,671.99 16,084.70 14,293.44 16,815.82 122.98 264.88 38.00 947,000 12,441.04 14,636.52 13,063.09 15,368.35 13,685.15 16,100.17 14,307.20 16,832.00 123.11 265.16 38.00 948,000 12,453.00 14,650.59 13,075.65 15,383.12 13,698.30 16,115.65 14,320.95 16,848.18 123.24 265.44 38.00 949,000 12,464.96 14,664.66 13,088.21 15,397.89 13,711.46 16,131.13 14,334.71 16,864.36 123.37 265.72 38.00 950,000 12,476.92 14,678.73 13,100.77 15,412.67 13,724.61 16,146.60 14,348.46 16,880.54 123.50 266.00 38.00 951,000 12,488.88 14,692.80 13,113.32 15,427.44 13,737.77 16,162.08 14,362.21 16,896.72 123.63 266.28 38.00 952,000 12,500.84 14,706.87 13,125.88 15,442.21 13,750.92 16,177.56 14,375.97 16,912.90 123.76 266.56 39.00 953,000 12,512.80 14,720.94 13,138.44 15,456.99 13,764.08 16,193.03 14,389.72 16,929.08 123.89 266.84 39.00 954,000 12,524.76 14,735.01 13,151.00 15,471.76 13,777.23 16,208.51 14,403.47 16,945.26 124.02 267.12 39.00 955,000 12,536.72 14,749.08 13,163.55 15,486.53 13,790.39 16,223.99 14,417.23 16,961.44 124.15 267.40 39.00 956,000 12,548.68 14,763.15 13,176.11 15,501.31 13,803.55 16,239.47 14,430.98 16,977.62 124.28 267.68 39.00 957,000 12,560.64 14,777.22 13,188.67 15,516.08 13,816.70 16,254.94 14,444.73 16,993.80 124.41 267.96 39.00 958,000 12,572.60 14,791.29 13,201.23 15,530.85 13,829.86 16,270.42 14,458.49 17,009.98 124.54 268.24 39.00 959,000 12,584.56 14,805.36 13,213.78 15,545.63 13,843.01 16,285.90 14,472.24 17,026.16 124.67 268.52 39.00 56
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 960,000 12,596.52 14,819.43 13,226.34 15,560.40 13,856.17 16,301.37 14,485.99 17,042.34 124.80 268.80 39.00 961,000 12,608.48 14,833.50 13,238.90 15,575.18 13,869.32 16,316.85 14,499.75 17,058.53 124.93 269.08 39.00 962,000 12,620.43 14,847.57 13,251.46 15,589.95 13,882.48 16,332.33 14,513.50 17,074.71 125.06 269.36 39.00 963,000 12,632.39 14,861.64 13,264.01 15,604.72 13,895.63 16,347.80 14,527.25 17,090.89 125.19 269.64 39.00 964,000 12,644.35 14,875.71 13,276.57 15,619.50 13,908.79 16,363.28 14,541.01 17,107.07 125.32 269.92 39.00 965,000 12,656.31 14,889.78 13,289.13 15,634.27 13,921.94 16,378.76 14,554.76 17,123.25 125.45 270.20 39.00 966,000 12,668.27 14,903.85 13,301.69 15,649.04 13,935.10 16,394.24 14,568.51 17,139.43 125.58 270.48 39.00 967,000 12,680.23 14,917.92 13,314.24 15,663.82 13,948.26 16,409.71 14,582.27 17,155.61 125.71 270.76 39.00 968,000 12,692.19 14,931.99 13,326.80 15,678.59 13,961.41 16,425.19 14,596.02 17,171.79 125.84 271.04 39.00 969,000 12,704.15 14,946.06 13,339.36 15,693.36 13,974.57 16,440.67 14,609.77 17,187.97 125.97 271.32 39.00 970,000 12,716.11 14,960.13 13,351.92 15,708.14 13,987.72 16,456.14 14,623.53 17,204.15 126.10 271.60 39.00 971,000 12,728.07 14,974.20 13,364.47 15,722.91 14,000.88 16,471.62 14,637.28 17,220.33 126.23 271.88 39.00 972,000 12,740.03 14,988.27 13,377.03 15,737.68 14,014.03 16,487.10 14,651.03 17,236.51 126.36 272.16 39.00 973,000 12,751.99 15,002.34 13,389.59 15,752.46 14,027.19 16,502.57 14,664.79 17,252.69 126.49 272.44 39.00 974,000 12,763.95 15,016.41 13,402.15 15,767.23 14,040.34 16,518.05 14,678.54 17,268.87 126.62 272.72 39.00 975,000 12,775.91 15,030.48 13,414.70 15,782.00 14,053.50 16,533.53 14,692.29 17,285.05 126.75 273.00 39.00 976,000 12,787.87 15,044.55 13,427.26 15,796.78 14,066.65 16,549.01 14,706.05 17,301.23 126.88 273.28 40.00 977,000 12,799.83 15,058.62 13,439.82 15,811.55 14,079.81 16,564.48 14,719.80 17,317.41 127.01 273.56 40.00 978,000 12,811.79 15,072.69 13,452.38 15,826.32 14,092.97 16,579.96 14,733.55 17,333.59 127.14 273.84 40.00 979,000 12,823.75 15,086.76 13,464.93 15,841.10 14,106.12 16,595.44 14,747.31 17,349.77 127.27 274.12 40.00 980,000 12,835.71 15,100.83 13,477.49 15,855.87 14,119.28 16,610.91 14,761.06 17,365.95 127.40 274.40 40.00 981,000 12,847.67 15,114.90 13,490.05 15,870.65 14,132.43 16,626.39 14,774.81 17,382.14 127.53 274.68 40.00 982,000 12,859.62 15,128.97 13,502.61 15,885.42 14,145.59 16,641.87 14,788.57 17,398.32 127.66 274.96 40.00 983,000 12,871.58 15,143.04 13,515.16 15,900.19 14,158.74 16,657.34 14,802.32 17,414.50 127.79 275.24 40.00 984,000 12,883.54 15,157.11 13,527.72 15,914.97 14,171.90 16,672.82 14,816.08 17,430.68 127.92 275.52 40.00 985,000 12,895.50 15,171.18 13,540.28 15,929.74 14,185.05 16,688.30 14,829.83 17,446.86 128.05 275.80 40.00 986,000 12,907.46 15,185.25 13,552.84 15,944.51 14,198.21 16,703.78 14,843.58 17,463.04 128.18 276.08 40.00 987,000 12,919.42 15,199.32 13,565.39 15,959.29 14,211.36 16,719.25 14,857.34 17,479.22 128.31 276.36 40.00 988,000 12,931.38 15,213.39 13,577.95 15,974.06 14,224.52 16,734.73 14,871.09 17,495.40 128.44 276.64 40.00 989,000 12,943.34 15,227.46 13,590.51 15,988.83 14,237.68 16,750.21 14,884.84 17,511.58 128.57 276.92 40.00 990,000 12,955.30 15,241.53 13,603.07 16,003.61 14,250.83 16,765.68 14,898.60 17,527.76 128.70 277.20 40.00 991,000 12,967.26 15,255.60 13,615.62 16,018.38 14,263.99 16,781.16 14,912.35 17,543.94 128.83 277.48 40.00 992,000 12,979.22 15,269.67 13,628.18 16,033.15 14,277.14 16,796.64 14,926.10 17,560.12 128.96 277.76 40.00 993,000 12,991.18 15,283.74 13,640.74 16,047.93 14,290.30 16,812.11 14,939.86 17,576.30 129.09 278.04 40.00 994,000 13,003.14 15,297.81 13,653.30 16,062.70 14,303.45 16,827.59 14,953.61 17,592.48 129.22 278.32 40.00 995,000 13,015.10 15,311.88 13,665.85 16,077.47 14,316.61 16,843.07 14,967.36 17,608.66 129.35 278.60 40.00 996,000 13,027.06 15,325.95 13,678.41 16,092.25 14,329.76 16,858.55 14,981.12 17,624.84 129.48 278.88 40.00 997,000 13,039.02 15,340.02 13,690.97 16,107.02 14,342.92 16,874.02 14,994.87 17,641.02 129.61 279.16 40.00 998,000 13,050.98 15,354.09 13,703.53 16,121.79 14,356.07 16,889.50 15,008.62 17,657.20 129.74 279.44 40.00 999,000 13,062.94 15,368.16 13,716.08 16,136.57 14,369.23 16,904.98 15,022.38 17,673.38 129.87 279.72 40.00 57
Permit Issuance Fee $58.25
P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE P.C. FEE PERMIT FEE R-OCC. OTHERS GREEN
FEES
CITY OF CUDAHY
Building Permit and Plan Checking Fees
VALUATION
NOT OVER
STANDARD + DISABLED ACCESS + ENERGY + ENERGY & DISABLED SMIP FEES The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County. 1,000,000 13,074.90 15,382.23 13,728.64 16,151.34 14,382.39 16,920.45 15,036.13 17,689.56 130.00 280.00 40.00 STANDARD FEES: Standard Plan Check fee is equal to 85% of the building permit fee with a minimum standard plan check fee of $172.77. Permit issuance fee is $58.25.Standard Building Permit Formulas:700 - 25,000 valuation- VALUATION (minus) 1000 (divided by) 1000 (times) 23.73 (plus) 92.10 (times) 1.5 25,001 - 50,000 valuation- VALUATION (minus) 25000 (divided by) 1000 (times) 18.23 (plus) 662.94 (times) 1.550,001 - 100,000 valuation- VALUATION (minus) 50000 (divided by) 1000 (times) 13.80 (plus) 1125.93 (times) 1.5100,001 - up valuation- VALUATION (minus) 100000 (divided by) 1000 (times) 9.38 (plus) 1812.82 (times) 1.5 ENERGY FEES: Energy Building Permit fee is equal to 110 % of the standard building permit fee.
Energy Plan Check fee is equal to .9350% of the standard building permit fee.
DISABLE ACCESS: Disable Access Building Permit fee is equal to 105% of the standard building permit fee.
Disable Access Plan Check fee is equal to .8925% of the standard building permit fee.
DISABLE ACCESS Energy and Disable Access Building Permit fee is equal to 115% of the standard building permit fee. & ENERGY: Energy and Disable Access Building Plan Check fee is equal to .9775% of the standard building permit fee.STRONG MOTION: Strong Motion Instrumental Program fee is charged at time of permit issuance:
.013 % of the total valuation of a Group R Occupancy,.028 % of the total valuation of all other occupancies,or $.50, whichever amount is higher.
EXCEPTIONS: 1. A combined swimming pool permit may be issued for a new swimming pool, spa or hot tub which will include all building, electrical, plumbing, heating, and excavation work. The total permit fee for the combined swimming pool permit shall be two times the building permit fee.2. A combined building permit for one-family or two-family dwelling and attached garages(s) shall be 1.6 times the building permit fee. (Section 106.5.6 & Section 107.1) Building Permit Fees are pursuant to the California Building Code, Section 107.1 and the County of Los Angeles Building Code Fee Schedule, Table 1-A.
Building Plan Check Fees are pursuant to the California Building Code, Section 107.2 and the County of Los Angeles Building Code Fee Schedule, Table 1-A. 58
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE
50 604.55 341.66
100 604.55 507.96200 810.15 679.92300 1,015.76 851.88400 1,221.36 1,023.84500 1,426.97 1,195.80600 1,632.57 1,367.76700 1,838.18 1,539.72800 2,043.78 1,711.68900 2,249.39 1,883.64 1,000 2,454.99 2,055.602,000 2,630.90 2,201.403,000 2,801.57 2,345.874,000 2,972.24 2,490.335,000 3,142.91 2,634.806,000 3,313.58 2,779.267,000 3,484.25 2,923.738,000 3,654.92 3,068.19 9,000 3,825.59 3,212.66
10,000 3,996.26 3,357.1211,000 4,095.90 3,447.6812,000 4,196.52 3,539.8813,000 4,297.14 3,632.0914,000 4,397.76 3,724.2915,000 4,498.38 3,816.5016,000 4,599.00 3,908.7017,000 4,699.62 4,000.9118,000 4,800.24 4,093.1119,000 4,900.86 4,185.32 VOLUME
(cu. yds.) NOT OVER
GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
59
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
20,000 5,001.48 4,277.5221,000 5,102.10 4,369.7322,000 5,202.72 4,461.9323,000 5,303.34 4,554.1424,000 5,403.96 4,646.3425,000 5,504.58 4,738.5526,000 5,605.20 4,830.7527,000 5,705.82 4,922.9628,000 5,806.44 5,015.1629,000 5,907.06 5,107.3730,000 6,007.68 5,199.5731,000 6,108.30 5,291.7832,000 6,208.92 5,383.9833,000 6,309.54 5,476.1934,000 6,410.16 5,568.3935,000 6,510.78 5,660.6036,000 6,611.40 5,752.8037,000 6,712.02 5,845.0138,000 6,812.64 5,937.2139,000 6,913.26 6,029.4240,000 7,013.88 6,121.6241,000 7,114.50 6,213.8342,000 7,215.12 6,306.0343,000 7,315.74 6,398.2444,000 7,416.36 6,490.4445,000 7,516.98 6,582.6546,000 7,617.60 6,674.8547,000 7,718.22 6,767.0648,000 7,818.84 6,859.2649,000 7,919.46 6,951.4750,000 8,020.08 7,043.67 60
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
51,000 8,120.70 7,135.8852,000 8,221.32 7,228.0853,000 8,321.94 7,320.2954,000 8,422.56 7,412.4955,000 8,523.18 7,504.7056,000 8,623.80 7,596.9057,000 8,724.42 7,689.1158,000 8,825.04 7,781.3159,000 8,925.66 7,873.5260,000 9,026.28 7,965.7261,000 9,126.90 8,057.9362,000 9,227.52 8,150.1363,000 9,328.14 8,242.3464,000 9,428.76 8,334.5465,000 9,529.38 8,426.7566,000 9,630.00 8,518.9567,000 9,730.62 8,611.1668,000 9,831.24 8,703.3669,000 9,931.86 8,795.5770,000 10,032.48 8,887.7771,000 10,133.10 8,979.9872,000 10,233.72 9,072.1873,000 10,334.34 9,164.3974,000 10,434.96 9,256.5975,000 10,535.58 9,348.8076,000 10,636.20 9,441.0077,000 10,736.82 9,533.2178,000 10,837.44 9,625.4179,000 10,938.06 9,717.6280,000 11,038.68 9,809.8281,000 11,139.30 9,902.03 61
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
82,000 11,239.92 9,994.2383,000 11,340.54 10,086.4484,000 11,441.16 10,178.6485,000 11,541.78 10,270.8586,000 11,642.40 10,363.0587,000 11,743.02 10,455.2688,000 11,843.64 10,547.4689,000 11,944.26 10,639.6790,000 12,044.88 10,731.8791,000 12,145.50 10,824.0892,000 12,246.12 10,916.2893,000 12,346.74 11,008.4994,000 12,447.36 11,100.6995,000 12,547.98 11,192.9096,000 12,648.60 11,285.1097,000 12,749.22 11,377.3198,000 12,849.84 11,469.5199,000 12,950.46 11,561.72 100,000 13,051.08 11,653.92110,000 13,355.90 11,887.82120,000 13,634.31 12,117.53130,000 13,912.73 12,347.24140,000 14,191.14 12,576.95150,000 14,469.56 12,806.66160,000 14,747.97 13,036.37170,000 15,026.39 13,266.08180,000 15,304.80 13,495.79190,000 15,583.22 13,725.50200,000 15,861.63 13,955.21210,000 16,140.05 14,184.92220,000 16,418.46 14,414.63 62
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
230,000 16,696.88 14,644.34240,000 16,975.29 14,874.05250,000 17,253.71 15,103.76260,000 17,532.12 15,333.47270,000 17,810.54 15,563.18280,000 18,088.95 15,792.89290,000 18,367.37 16,022.60300,000 18,645.78 16,252.31310,000 18,924.20 16,482.02320,000 19,202.61 16,711.73330,000 19,481.03 16,941.44340,000 19,759.44 17,171.15350,000 20,037.86 17,400.86360,000 20,316.27 17,630.57370,000 20,594.69 17,860.28380,000 20,873.10 18,089.99390,000 21,151.52 18,319.70400,000 21,429.93 18,549.41410,000 21,708.35 18,779.12420,000 21,986.76 19,008.83430,000 22,265.18 19,238.54440,000 22,543.59 19,468.25450,000 22,822.01 19,697.96460,000 23,100.42 19,927.67470,000 23,378.84 20,157.38480,000 23,657.25 20,387.09490,000 23,935.67 20,616.80500,000 24,214.08 20,846.51510,000 24,462.20 21,076.22520,000 24,714.89 21,305.93530,000 24,967.58 21,535.64 63
Permit Issuance Fee $58.25 P.C. FEE PERMIT FEE VOLUME (cu. yds.) NOT OVER GRADING
CITY OF CUDAHY
Grading Fees
TAKE THE HIGHEST CUT/FILL (& ADD any OVEREXCAVATION) FOR PC & PERMIT FEES
The City utilizes the most up to date fees established by LA County for the below services. The below fee table reflects the fees currently adopted by LA County.
540,000 25,220.27 21,765.35550,000 25,472.96 21,995.06560,000 25,725.65 22,224.77570,000 25,978.34 22,454.48580,000 26,231.03 22,684.19590,000 26,483.72 22,913.90600,000 26,736.41 23,143.61610,000 26,989.10 23,373.32620,000 27,241.79 23,603.03630,000 27,494.48 23,832.74640,000 27,747.17 24,062.45650,000 27,999.86 24,292.16660,000 28,252.55 24,521.87670,000 28,505.24 24,751.58680,000 28,757.93 24,981.29690,000 29,010.62 25,211.00700,000 29,263.31 25,440.71710,000 29,516.00 25,670.42720,000 29,768.69 25,900.13730,000 30,021.38 26,129.84740,000 30,274.07 26,359.55750,000 30,526.76 26,589.26760,000 30,779.45 26,818.97770,000 31,032.14 27,048.68780,000 31,284.83 27,278.39790,000 31,537.52 27,508.10800,000 31,790.21 27,737.81810,000 32,042.90 27,967.52820,000 32,295.59 28,197.23830,000 32,548.28 28,426.94840,000 32,800.97 28,656.65 64