Non-Structural Components and Systems for Options B and C Existing anchorage and support details for the majority of the architectural, mechanical, electrical, and plumbing components are unknown. Additional as-built documents or site survey may be required to assess the building's non-structural components and systems conformance to the Performance Objective. The Nonstructural Performance Level for an Essential Facility should satisfy the ASCE 41-13 "Operational" Objective, where the nonstructural components and systems are able to perform the same functions they provided before the earthquake. Per ASCE 41-13, Tables C2-5 and C2-6, non-structural components, such as architectural, mechanical, electrical, and plumbing systems should have only negligible damage after a seismic event. There should be no loss of function to exterior cladding panels and they should remain weather-tight. There should not be any cracked or broken panes in the exterior glazing. There should only be negligible damage to interior partitions and ceilings with no impact on occupancy and functionality. Elevators will remain in operation. HVAC equipments, electrical distribution, and plumbing system remain operational if emergency power and other utilities are provided. Fire alarm systems and emergency lighting should remain operational. Ducts, fire suppression piping, and light fixtures should have only negligible damage.

It is likely the exterior cladding and glazing system needs to be replaced with a new system that can satisfy the Essential Facility performance objective. Anchorage and bracing for the existing suspended ceiling and interior partitions will also need to be strengthened and upgraded. Similarly, the same will apply to all of the existing mechanical, electrical, plumbing, and emergency systems if they remain. It may difficult to meet the operational performance objective for Option B where the existing building systems where not intentionally designed to remain in operation with only negligible damage after a major seismic event. Option C would allow these systems to be explicitly designed to satisfy the operational performance objective. Finally, new or existing roof mounted equipment should be properly anchored to roof framing. For moderate to heavy pieces of equipment, additional localized strengthening of the roof framing members should be anticipated.

Appendix Page 269
164
CC 05-03-2022
164 of 1033
f-)'-
Legerid:
(N) COnefflt* Wall
76- =o-: (N) Pile Cap with Micropiles
Provide 4' wide x 6' long x 4' deep pile
cap with 2 micropilss at each cap.

Micropile capacity +/-150 kip design
load.

TIPPIN(IIMAR

STRUC,TLIRAL ENGINEERING
!ihaRuck AVI )leikeley.
510 549-1906 510 54aA912 fax
Cupertino City Hall I Option B
Cupertino, CA
TM Project: 2014,094 Scale: As Noted
Terrace Level Plan
8eptember29 2014
SO
Appendlx Page 270
165
CC 05-03-2022
165 of 1033
o
z
al
r'=. =i
o
"n
o
o
't
i{
166
CC 05-03-2022
166 of 1033
"" ffl
x
z
o

I I , I
l,:,
{, lil,
4lf., i
i-a'
.h -.11 & a+a
I!; 1% i
}l l'
l'- - - - [- - - -ff Q
I ' "i' -"
il.l.l
.k ( .I
I r
a' i
1" a '.' - 4 l I
:JI' i
t z s '- i
t:, .0 , I,4 ,. v I
t, 1,1
,l 'a
4, ,, ,.f0 !n 2 'I
ffl
gB:!' Z
a 2 5 N,
! 4m
a p 8
167
CC 05-03-2022
167 of 1033
EXIST(NG %VOOD

ROOF BEAM

LAPPING
DOWELS
E)ffSTINO ELEVATE[I
FLOOR SL!'8, CONCRETE
JCI!STS J%MD iBEAllS

EXISTING
RET AININ(; WALt
EX!STING SLA[3
(t=A GRADE .

EXIST{NG ROOF

DIAP)-IRAGM
EXIST)Ne STEa

RO(F BEAM
EXiSTl4G CONCRETE
COl.U'MN BEYOND
NEW I2" CONCRETE SHEAR WALL
OR
-NEW 6' (,ONOFIETE SHEAFI WALL
W/ (E) O" CONCRETE !>HEAR WALL
P!5R PLAN
(N) L8xex3tt8" EACH
SIDE !V/ 2-3/4" D€ A.

THRU BOLTS
(N) 3/4" EPOXY

GROUTED THREADED

ROD EACH SIDE OF

WD GIRDER
EX ST[NG SLAB
(E)U4" PLATE
a-s4M .
5[
tOi'Q!J' 6AEi MAM
\ (N) 2x OR 3x BLKG
} W/ SIMPSON SDS SCREWS
u@ TOP AND A35 CLIPE) @ EITM
DETAIL 4 - COLONNADE TO ROOF ANCHORAGE
WOOD 3X12 SHIM W/
4-3/4" DIA
Nj'.lL.alZ5 &;&;WH IN anll'i tllTA}L
,70K 6L!iiaiy, t
DITAII $ - OIOTaON AT Nff @ONaRff! OHWAR WAII DET A1L2 - STEEL TO STEEL COLLECTOR SPLICE 'rippmiolMAR
SY'RUCT'tJRA $ATGiN6f#
C:upertino City Hall I Option B
OupgrUrio, CA
YM Prolaat: 2014,094 9ca)e; As Noted
DET AIL 1- STEEL TO WOOD COLLECTOR CONN.

Retrofit Details
Ssptombsr29 2014
83 Appendix Page 273168
CC 05-03-2022
168 of 1033

TIPPINGIMAR

ST UCTURAL ENGIN
Shattuck AV& Betkalay,
510 549-1906 5'l0 5494912 fax
'. I,t
t §, ,
Cupertino City Hall I Option C - Light Court
Cup*rtkio, CA
TU PrOj41* 2014,094 Seale: Aa NoUed
mX
;5Ta,":'q-2 (N) Pilei Cap vith MNcropiles
Provide 4' hide x s' lorig x pa deep pile
cap with 2 mtcropiles at each cap.

Mfcroplle capacity +/- 150 kip design
load.

Terrace Leve € Plan
k@amber29 2014
SO
Appendix Page 274
169
CC 05-03-2022
169 of 1033
,4i ( ' ." ' l ty,
4 ' 7 ,t %
l t 'vi =+ -
% X - .."

INFILL (E) OPENING
Cupertino City Hall I Optlon C - Light Court
Cupertino, aA
TM Project: W14,094 Rh,da: Aa Ndb4
Ground Floor Plan
8eptember29 2014
81 Appendix Page 275
170
CC 05-03-2022
170 of 1033
2S €ifl"'
6 N 5 E €
o
o
iil7 'ffi. '+-..-r 4;:'l.):.r
rUI.:; € l,
ij"' -" ""' ""' "':7"'-""""}""'-"'- . "' """""'-""--' ir - :.
lt - .... a'5J'J.. : C :,' :: " ' ...a a " "II . -. . a . it. '.:'=._".' ....': :i .. " '..
' " 'i: ' @ " " .. :' . 'a :' " al,. .. ; .. iy, ..,.. .i ,, 'i' "-' !S , ;",.. -' .=It" - .:= '3 ' - ..

II ,,,, :4. i:. .'; f. -%. ,'i H, , a . %.. - l_ . (. :..." il k ,t)D - . - :t-, __ .,.(tl' ,::f)" :'a ... :. '/ : ',; ::: :I !='=h-';]
il . :'I ' : ;'
l!
.- Z
i. _t
g. '::
l: --
l' ....,....
l"
l' .
_ W:, a ' Wj
('al
:'2
:,
r+,i,;..:f. ,,-a , ,.,j. ":i:
i,__= u,..;,.{).,. .... ,:.,.' ..... ,. .

I - .- .= .!.'_,. -...'..,.,. a - ,u" 4-
_ x 4? a- 'ffi ffi"""a'-.'--7. J, - :, ..l... -4 .. :.. .... ;l .- - , ,,,l.:.,,l,:,(""""" ) . j.ll: ,:,..,,'o""" ::." ; t. : .."::,, .1,...l""'. i . " " " ' a ::. i ' ( .. ::, " . _ " " , : " II . :l :.l: i. ; ,l . , ," ' : ' . . .. . I . ' . " " ,. , :," ' . ..., . " " . ,. . . ' . .11,. ' :, .: : I( . .. = . . , i., % .. .1. ,,, i ii ....a . iiiiii iiiiii __. _.l. i" ll _,_. _ . ii iii :i " i'i :iiiii:iii I'll. ..ll. .ll_l. . iiiisii>iiiiii- .. . s, l!i, i
% '{ f i
o
o
o
171
CC 05-03-2022
171 of 1033

LAPPING
DOWEL!5
EX!STNG aEVATED
FL.OOR StA(3, CONCRETE
J4JSTS AND eEAMS '

EXIISTING
f'lETAiNlt=lO WALL
EXtSTING SLAE3
ON (3RA[)E ....

F:7%:00FEXlSTiHH4TEa
EXiSTt4G CONCRETE

COLUMN BE- YOND
NEW 12" CONCRETE SHEAR WALL
OR
6' (,ONE,RETE SHEAR WALL
Wl (E) 8" CONCRETE SHEAR WALL

PER PLAN
(N) LBx6xS/8" EACH
SIDE W/ 2 3/4" DIA.

THRU .BOLTS
+AT ? 'a'
Rae.x*'tai+- 4
S (Ni2xOR3xBLKG

W/ SIMPSON SDS SCREWS
TOP AND 435 CLIPS @ BTM
(N) 3/4" EPOXY

GROUTED THREADED

FIOD EACH SIDE OF
WD GIRDEREX'ST{NG SLAB
i ;b !l ;l. + !,F 4

EACH SIDE
DET AIL 4 - COLONNADE TO ROOF ANCHORAGE
WOOD 3x12 SHIM W/
4-3/4" DIA
D!TAI! 3 - aia'raow AT mw OONmrr! aHiAR WAIL DETAIL 2 - STEEL TO STEEL COLLECTOR SPLICE DET AIL 1- STEEL TO WOOD COLLECTOR CONN.

TIPPINGIMAR
TRUCTuRAl ffNalNffi[RlNa
19065ha!iudiAi'a Bsiksls:g.syo4
5i05A91906 alOM5-1912%k
Cupartirbo City Hall I Option C
Cupairtfrio, CA
TM ProJeat aOi410M 9(!810: Ae Hated
- Light Court Retrofit Detafis
8eptsmber29 2014
83 Appendix Page 277
172
CC 05-03-2022
172 of 1033
Cupertino City Hall Seismic Evaluation - Tier 1
MME Project No: 21143.P5
November 30, 2021

Page 123 of 171 ends

APPENDIX H Cupertino City Hall MME Analysis 2021
224 Waanut Avenue, Suite B Santa Cruz, CA 831.426.3j86 www.m-me-com 173 CC 05-03-2022
173 of 1033
MME
224 Walnut Ave
Santa Cruz, CA 95060
831-426-3186
LOADS
Floor Superimposed
Carpet & 3/8" underlayment
Suspended Tile System
Plumbing, Mech, Elect - Office
Fire Sprinklers
Movable Partitions
Project# 21143 MasterAgreementfor
Sheet Engineering Services
Calculated by RR DATE: 11/29/21

2.3 PSF
I .8 PSF

4.O PSF

3.O PSF

15.O PSF
Misc
Floor - SuperimposedDead Load
Live Load - Offices
Live Load - Offices - Lobbies and first-floor corridors Live Load - Decks - Office
Floor Structural
3" Concrete Slab
Concrete Joist 6xl2@3'
Concrete Dist. Rib 6xl2@24'
Concrete Girder 16X33@24'
Misc
Dead Load Floor - Structural
Floor

3.9 PSF

30.O PSF

50.O PSF
100.O PSF
ipancy Served

0.O PSF

25.O PSF

3.2 PSF

23.O PSF

0.O PSF

0.O PSF

0.O PSF

0. O PSF

1. 3 PSF

52.5 PSF

0.00 PSF

0.00 PSF

0.O PSF

0.O PSF
Misc
Dead Load Floor -

0.O PSF

0.O PSF

0.00 PSF

0.00 PSF

0.O PSF

0.O PSF
174
CC 05-03-2022
174 of 1033
MME
224 Walnut Ave
Santa Cruz, CA 95060
83'l-426-3186
LOADS
Roof Sloped Super Imposed
Spanish clay tile no mortor
3X Flat T&G
Plumbing, Mech, Elect - Commercial
Fire Sprinklers
Fiberglass Batt R-39 (12")
Suspended Tile System
Misc
Roof Dead Load
Roof Live Load - Ordinary Flat, Pitched, and curved Angle = 18.4
Slope= 4.0 :12.00

19.00 PSF

7.30 PSF

4.00 PSF

3.00 PSF

0. 60 PSF

1. 80 PSF

0.00 PSF

0.00 PSF
Project# 21143
Sheet
Calculated by RR
Master Agreement for
Engineering Services
DATE:

Slope Factor =
09/09/21

1.06 20.1 PSF

7.7 PSF

4.2 PSF

3.O PSF

0.6 PSF
I .8 PSF

0.00 PSF

0.00 PSF

2.4 PSF

40.O PSF

20.O PSF
Roof Sloped Structural
1/2" Plywood or OSB
6X16 @ 6'
W16x3l Perimeter
Concrete Beam 1 0xl8 Perimeter
Slope= 4.0 :12
I .67 PSF

3.30 PSF

0.10 PSF

0.30 PSF
Slope Factor =
I .06
I .06
I.OO

1.00 1.06

1.8 PSF

3.5 PSF

0.1 PSF

0.3 PSF
Misc
Roof Dead Load
Roof Live Load - Ordinary Flat, Pitched, and curved

2.3 PSF

8.O PSF

20.00 PSF
Roof Slope= 0.0 :12

0.00 PSF
Slope Factor =
I .00

1.00 0.O PSF
Misc
Roof Dead Load

0.O PSF

0.O PSF 175
CC 05-03-2022
175 of 1033
224 Walnut Ave
Santa Cruz, CA 95060
831-426-3186
LOADS
Roof Flat Super Imposed
Single Ply Roof Membrane
Plumbing, Mech, Elect - Commercial
Fire Sprinklers
Roof Mechanical Units
Fiberglass Batt R-39 (12')
Suspended Tile System
Misc
Roof Dead Load
Roof Live Load - Ordinary Flat, Pitched, and curved Angle = 0.0
Slope= 0.0 :12.00

0.70 PSF

4.00 PSF

3.00 PSF

3.00 PSF

0. 60 PSF

1. 80 PSF

0.00 PSF

0.00 PSF
Project# 21143
Sheet
Calculated by RR
Master Agreement for
Engineering Services
DATE:

Slope Factor =
I .00

1.00 I .00
1 .00
I .00
I .00
I .00
I .00
09/09/21
1 .00

0.7 PSF

4.O PSF

3.O PSF

3.O PSF

0.6 PSF
I .8 PSF

0.O PSF

0. O PSF

1. 9PSF

15.O PSF

20.O PSF

0.O PSF
Roof Flat - Framing Slope= 0.0 :12
1 /2" Plywood or OSB 1.67 PSF
2x14 at 16" QC 3.70 PSF
W16x3lPerimeter O.IOPSF
W21x55 @ 24' QC 2.30 PSF
Slope Factor =
I .00
I.OO

1.00 1 .00

1.00 1.67 PSF

3.70 PSF

0.10 PSF

2.30 PSF
Misc
Roof Dead Load
Roof Live Load - Ordinary Flat, Pitcmd, and curved

2.2 PSF
IO.O PSF

20.00 PSF

0.00 PSF
Roof Slope=4.0 :12

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF
Misc
Roof Dead Load
Roof Live Load - Ordinary Flat, Pitcbed, and ctuved Slope Factor =

1.06 1.06

1.06 1.06

1.06 1.06

1.06 1.06

1.06 0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.00 PSF

0.O PSF

0. 00 PSF

1. 4 PSF

1.4PSF

20.00 PSF

0.00 PSF
176
CC 05-03-2022
176 of 1033
MME
224 Walnut Ave
Santa Cruz, CA 95060
831-426-3186
LOADS
WallExterior Typical
Drywall - 5/8"
Wood Plank siding (3/4')
1 /2" Plywood or OSB
2 x6 at 16' QC w/3 plates
Wall Plumbing, Mech, Elect
Misc
Dead Load
Project# 21143
Sheet
Calculated by RR
Master Agreement for
Engineering Services
DATE:
% of Wall

2.8 PSF 100%

2.I PSF IOO%

1. 7 PSF 100%

2. 4 PSF 100%

0.5 PSF 100o/o
Wall Exterior - Typical
Wall Exterior Shearwall
Drywall - 5/8"
Wood Plank siding (3/4')
1 /2" Plywood or OSB
2 x4 at 16" QC
2x4 at 16" QC
6" Concrete Slab or Wall

2.8 PSF

2.1 PSF

1.7PSF

1.O PSF
I.O PSF

75.O PSF
% Of Wall
100%
100%
100%
100%
IOO%
100%
IOO%
Misc
Dead Load Wall Exterior - Sheanuall
Walllnterior Typical
Interior Partition Movable (per floor area)
% of Wall

15.OPSF 100%

0.O PSF 100%

0.O PSF 100%

0.O PSF 100%
Misc
Dead Load Wall Interior - Typical
Wall Interior Wood Framed
Drywall - 5/8'
Drywall - 5/8'
Wall Plumbing, Mech, Elect
2x6 at 16' QC w/3 plates
% Of Wall

2.8 PSF 100%

2.8 PSF 100o/o

0.5 PSF 100%

2.4 PSF 100%

0.O PSF 100%
Misc
Dead Load Wall Interior - Wood Framed
10/06/21
Total

2.8 PSF

2.I PSF
I .7 PSF

2.4 PSF

0.5 PSF

0.O PSF

0.O PSF

0. O PSF

1. 5 PSF
II.O PSF
Total

2.8 PSF

2.1 PSF

1.7 PSF

1.O PSF
I.O PSF

75.O PSF

0.O PSF

0.O PSF
1-4 PSF

85.O PSF
Total

15.O PSF

0.O PSF

0.O PSF

0.O PSF

0.O PSF

0.O PSF

0.O PSF

0.O PSF

0.O PSF

15.O PSF
Total

2.8 PSF

2.8 PSF

0.5 PSF

2.4 PSF

0.O PSF

0.O PSF

0.O PSF

0. O PSF

1. 5 PSF

10.O PSF
177
CC 05-03-2022
177 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com
Jn, 21143.P5CupertinoCityHallEQEval

SHEET NO (')F
CALCULATED BY BR nATF
CHECKED BY nATF
SCAIF

AREA FLOOR

EXTERIOR
AREA - FLOOR INTERIOR = 11548 SQ FT
AREA - FLOOR EXTERIOR = 396 SQ FT
AREA - FLOOR VERANDA = 940 SQ FT
AREA - FLOOR TOTAL = 11944 SQ FT
BELOW 1ST FLOOR
LENGTH OF EXT. 12" WALL = 145 FT
LENGTH OF EXT. 18" WALL = 37 FT
LENGTH OF EXT. 18" VERANDA WALLS = 12 FT
LENGTH OF INT. 6" WALLS = 180 FT
# OF INT COLUMNS (BELOW) = (9) x 10.75 FT
178
CC 05-03-2022
178 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
83'l.426.3'l861 www.m-me..com
J.R 211 43.P5 Cupertino City Hall EQ Eval
SHEET Nn
CALCULATED BY BR nATF
CHECKED BY nATF

SCAI F
IX ___ _. ,;
l [%l__ __ _4
l 'I'!L 7
:' I X VI . 'tAlll._%l

1... +_l A&A Jlla 33
I----"a-
'1 _
'l
. {OA l!!-_ <
" 'l
ml
!Ne. A
g.! L: Z..

I!'}ia-
I-=o
,3__14__ q_[:?
i"!i Pi-Dil
r='
r -!;a
'4-
4- .

Th W-'=f;
€ r

1. i
iij
I
P-'---zI
,-!)
7 "='4-'m
4bJh Th-4-
4=-
=.. ?eb'x.
rg. 4g,..
-l' !-J Th
: *< l
A
i3i r
T._"'L-
T
r-'--'
1{Os,3 I.C-
l-':

W. The.V;'l
I-.GJ,.,
a4@ k
7_- :_:'t
i ill
s
i___A,
. 7#,+__"________a
,r
v/ i
J,i_llq + '!"" h.
2[-
i IL'i'il
-J
ffl' i l ; ,--% A. ,, :
7 ,,% *{
i"' +-+ W
I Qi!I
&l II *-
" ' i
I
;, - -- --i
:l I
l
I
"' I r I " i I J'+4 I _i_ a-.

I I I F I y l + l'!:'l I
i i i i t t * -i-7-+ t
_ .1 _ _ y_ I . (x%a& xzb7. 4z;a; a4h-t !', l.,2-on o. c.___ _ '-" II i I' I l= l l'

AREA OF SLOPED ROOF
I il i' I 1 I W
I . i
%b '1-+:l*'-(: z,+ i '7 'F ic- e>M , e. =' ib a:i o_;: +- -1 ""' l rt-bst a ,,,, ,,,-7 I
tT)'a
l- 7'
+" i " I I
A-s (} t I.11'!1 T i I
r' i i" l' l j' I r.
{t=':i
["""""' " l' "'-" "1'-6'..J/., . 4'. 5/
i - 4j .
i a,
l,'
1 l ,
u
l-'.
r' f:Vi',' !
r ,8. ; aa !I f'l'. I " k
I B.!i :
" Ma-
i -(!
I a_.: '; %"'\:
% Q } ,} "
% x ' -
,s!'/" i %'S ,,f' I (A :' ::- :3
i ii a
" N_' A@14 __$2 I "'\-ij , ,, , , ,, , , , , , ,,_, ..

X 0-li
J 6, . v.

I .jl .I
I i ii
S "" .l\
l#e@,:l
',;=';!
. - .___L_-'>___" ._ _."_
'l'"';'1'____4"
+ a,' aa - l -a "' a"a"" - "' -
i_ _ __ .,, _l . __ , l _mfl !.. -H'
_J -r:l
(ill 11
'I.i a. ' :l
t + l'.
r-'_-_"-__ _-.____.__._'--_ ]
r__-____:_
#-_______ :]I 3'j '- b):' -' r-:_ I ! ,: .= W!il'S,llai l' ' a' I E: .ti,' ] a . i ...-a'a "' S :>'lF_"_.. ____-.__._.___________ii F-:'_Z__.'J:'j":J"'___7.'__'-.=z:_ 7." ',,a'a" i tTi ,i i, :ia', 'l : i" I " ' ii !il II ;' :c "'i ":l 'l (+, . il A-i _..+i.
!i":Pi"""' + o ">"% ";'] i=E===-:__'-;E
I - '-- i7,,i_+,,_-"'- '-""-'- ':.' -% - ' -, - %t. -- - ' aa,'- :--.lx'aa'a'a'-'r4-: pX.," - --'a3:'it-':_i:':'ii!-l- "1 I N; sa'_ = '*' X: ' ./':
"N1_'l @ti i .... g. i iS.,,s""dl I - va"-b I :y' S' l 'r',l
ili ...7
kl-5,,=j-, -,Q,2qF_.._+....l___,(,___l.'a'aiZ"'l-...lllllll__'i..xa"'"a;....'" f: %;""- " -a . a - a ' € -
..a 'Z ' a " %, ,
' t ._ _'. l _ _ . 0 _J_ :'4""""""i!""'4'a"""'a"'la"aaa1 8 t sr, :, .,l' .ii, li1 " i ily._y. :'i.,""a'r:,....%""a'l s. 1. . .i...a..+'"a"o -i..."'a!i ...i_,r y___'_-.____.- ..._....-.1 l' i " F "" "_ J-J' "'a =r':2a"_a'a"? ":';":'' a" X ';2ffi-..-...- a4' ____l""." .'.'Q____._..."'._._I I _l l' I I ; I :l ;l
i I
' , " bvi4 ,
t ",_rp=-!-'.' =;Pa,,xycv
:::.-. i,N B_-7_q______n__c_.JA.-<5t=r,tfA"rl_Q-q9-g-_ll" Ml .,-_L. i.A .g.l j
J r I
-- - i I .""""""-""""...--ffir!.. t ' o ]'--..'T:.'J.:T'f'.I:JSJ.Z'-.'..-:Z.'TJ-.._J_Z_S'__--"._____I I \ + i ._. _.. ,___. i ._x' N __'-'-"'7"?"-.U::)(:U":F-'H'ffi=._ i' z'-'iT'-"-' :t:ffl..,,f T.. T..-.: '_'..""'iLIl"'-: ffl... :.."-' .- ._.. i . . J I @' aiy.!' . - ]
r:-______'- f € _ :ffi_____-___ .,J
i_"z'xx_'-'::_'-'____y______-'-=-____-..p:iI a" €a J
;'j_,
i""'-:; -=- -- -"" "-"'
! '% j 4%'a ' !
-4;, .
4 ', !;j ,! :i.= ] j'E.l t5, '_-E'3:'
)______._.__" __ G&_L_. _._ __ L..___ __ ._._____" _. - € __ ;__-4 ;,
i !4 ' ;i4,i'.j
:, , N,
Q I +,
:tm ,-'-j
d. i'_.9 .,.a $
I 'a'a "' [_0: I?-_..-iffi.._...'Jli_-____
r.

II
I
8i I.i I
*, A. 1, , l
y ' : kli;__:.._ii.__... _ I
" bht'r -at i
a8.J * I
§l !
j
11 "s
r_ 7_.._-Z-_+--.I..-__- -_ a"za__. i ;____'.___zz7_____,_______'7__ a_____)Z I ffi"-J-:
i a
l .';AQ a
I"A, I , =..-. ]
r-='__._'____z_'-.
'f"u"7.'"'"''y.4")'a'""aa"a
_;'
7a__7_I_:r_________--_E
W ffi-
-
< I ' -
I
:G. 4 it iii X
r
.. ...[7
a'"'aaal
I
, -.-J
i
I(A)
i
i
'.-
. )
IY-
7 i.+
I
>
-l
-
Z1.

I
'jN'-T ;a
i
r
i'
l-
I
fiiaa P
la -
I + ,.

T
j
I
I
":a-+'a_('l
i.. + I
I

1. :GX Q. !
l
I
I
II/, @. ;l.
-'-'i
I
i_. .... Th
S -' - W'i i
.i4
uill I a",'il_
,t. i 0 '-,(
'f} l l,' - "a
I
' .,'-,!
t
j
I
%@ -E
_=: ;;]
7":'1
'y*
""-=l I 8,
Cll I -yi
,l i J I ,A-
I<a
I , , 5',
%<r, i
q'%:a" 'i{!'l I4vi F % I 4-,'1
i j " 'I
i i'
:. : ai*ia - !
-4 - - -
I
I
I
1,
''i
,.,,J[, ..,.,=:._: f
l
:'T""
' *
__e0.
uunuuu'li. iiiiul
k...,
, ;t Jib,
l..,,.,.,,...,...,...
l,...,,
i(.5)14,_ ;l
I.x.x..x....,..::

I
I ,
L..............
;l:' "';"""
a @-
l - - =-
-, I
=
I
k. ? ),
_a(!a%a--
l '-S
';9S
4 ".
:...> ..

I
- _h-10
_t_ _ _.

I
I 4='a:-;y;
I ,'r 4-+
,L;.11:

S-=-
l->
Lcxie rc)--
€...T-i
:'__i i

1. bj,O !l.-l===
1<0%16(.:
r....."x.t.":..y.
t=...9,.
::lill, 3om.V.
l.....................

I j,
1--7_(
[1...............
!6 -l a
.L____
4ri{4 -*- - -
IDh i4 (;
l.-.-..
i"'i. 4F- a !
JteA,%'
:

AREA OF FLAT-ROOF = 3582 SQ FT
AREA OF SLOPED FIOOF = i3975 SQ FT
AREA OF ROOF TOTAL = i7292 SQ FT
LENGTH OF PARAPET = 244 FT
LENGTH OF VERANDA BEAM = 496 FT
LENGTH OF EXT. WALL TOT AL = 432 FT
LENGTH OF EXT. SHEARWALLS = 68 FT
LENGTH OF EXT. WALLS NON-SHEARWALLS = 364 FT
# OF VERANDA COLUMNS = (26) x 8.5 FT
# OF EXT COLUMNS = (18) x 11.75 FT
# OF INT COLUMNS = (12) x 19.63 FT
179
CC 05-03-2022
179 of 1033
C""ME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
83l.426.3j861www.m-me.com
JOB 2il43.P5CupertinoCityHall
SHEET NO.

CALCULATED BY BR
OF
. .DATE -
CHECKED BY TE .

SCALE
ROOF
l'i,), ,Z
tThJ a

ROOF OVERHANG
4'-0"
C z 5
; , / .'
:1
,,4,
7'-,,
180
CC 05-03-2022
180 of 1033
€ % jE
Civil +
224 Wainut Avenue, Suite B
Santa Cruz, CA 95060
83!,426.3186 I www.m-me.com
J,-,R 21143.P5 Cupertino City Hall
SHEET N(1
CAL(,ULATED BY BR r)ATF

CHECKED FIY DATF
!
-b '7 t% r= ':,,-5 7"-4;;.7
=,..V=,,.5 Ct"=,=ll,:(-=.-=')(%-_ = i-'E'= '
i
'J .f.,,xv,-_ r=;-_,_ r. %=,5 ,'; '<', ::"'-},.. - % 'E'< ' -a,] 0 ' I
i

1. 'i
i
i
i
i
I
I
j
I
181
CC 05-03-2022
181 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.3l861 www.m-me.com
J,R 211 43.P5 Cupertino City Hall

SHEET NO
CALCULATED RY r)ATF
CHECKED BY nATF
SCAIF
Cam
1, Hil li
II II
0 CI D

I II I
ill[lui
( "';'i%
182
CC 05-03-2022
182 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.3l861 www.m-me.com
J(')Fl 211 43.P5 Cupertino City Hall

SHEET NO
CALCULATED FIY nATF
CHECKED BY nATF
SCAI F
A y'4.-4 j 'Sri ": '2,.0
[-?AA 2 f='t"" ;r !pF T 'aa / (a, '1 '
C, T / 0 *z
a a a
V a:;*"';i$L:
ri
183
CC 05-03-2022
183 of 1033
MME
224 Walnut Ave, Santa Cruz
831-426-3186
Unit Weights
Description
Ext - Wood Framed wall
6" Ext Conc wall
Columns - Veranda
Columns - Ext
Columns - Int
Interior - Walls
Interior - Movable Partitions Above
Interior - Movable PartRions Below
Interior Walls - Roof
Interior Walls - Floor Above
Interior Walls - Floor Below
Parapet
Veranda Beam
Ext Beam
Ext - Wood Framed wall
6" Concrete Wall
12" Concrete Wall
18" Concrete Wall
Roof Sloped
Roof Flat
Floor Interior
Floor Exterior
Floor Veranda
Unit
#/ftA2
#/ftA2
L
L
L
#/ftA2
#/ftA2
#/ftA2
Each
Each
Each
L
L
L
#/ftA2
#/ftA2
#/ftA2
#/ftA2
#/ftA2
#/ftA2
#/ftA2
#/ftA2
#/ftA2
JOB: 21t43,P5 Cupertino City Hall
SHEETNO.: OF:

CALCULATEDBY: BR DATE: 10/2021
Unit Weights
o
II
85 163
163
163
15 7.5

7.5 91.9

91.9 45.8
130
188
31 II
75 150
225
120
120
75 Mech units Each 5000
184
CC 05-03-2022
184 of 1033
Weights
Roof
Walls
MME
224 Walnut Ave, Santa Cruz
831-426-3186
Roof Sloped
Roof Flat
Mech units
Roof Total
Ext - Wood Framed wall
6" Ext Conc wall
Columns - Veranda
Columns - Ext
Columns - Int
Interior Walls - Roof
Parapet
Veranda Beam
Ext Beam
Units
#/ftA2
#/ft'2
Each
#/ftA2
#/ft'2
L
L
L
Each
L
L
L
Qty
I
I
I
1 I
1 1
26 18
22 1
1 1
1 JOB: 2'l143.P5 Cupertino City Hall
SHEETNO.: OF:

CALCULATEDBY: BR DATE: 10/2021
Area or L
13975
3582
I
364
68 4. 25

5. 9

9.8 I1S48
244
496
432
W or H
#/ft or
#/ft'2
48 25
5000
o
o
11 85
163
163
163

91.9 130
188
31 W/1000
(kips)
670.8

89.6 5.0

0.0 0.0
765.4

23.6 34.1

18.2 18. 0

19. 2
1061.3

31.7 93.2

13.4 1206.1
Roof & Walls 1971.5
185
CC 05-03-2022
185 of 1033
Weights
Floor
Walls
MME
224 Walnut Ave, Santa Cruz
831-426-3186
Floor Interior
Floor Exterior
Floor Veranda
Floor Total
Above Ext - Wood Framed wall
Above 6" Ext Conc wall
Above Columns - Veranda
Above Columns - Ext
Above Columns - Int
Above Interior Walls - Floor Above
Above
Above
Above
Below
Below
Below
Below
Below
Below
Below
Below
Below
12" Concrete Wall
18" Concrete Wall
18" Concrete Wall
6" Concrete Wall
Columns - Int
Interior Wal'ls - Floor Below
Units
#/ft'2
#/ft'2
#/ftA2
#/ftA2
#/ft'2
L
L
L
Each
#/ft'2
#/ft'2
#/ft'2
#/ftA2
L
Each
Qty
I
I
1 I
I
26 18
12 I
I
I
I
I
9 I
JOB: 21143.P5 Cupertino City Hall
SHEETNO.: OF:

CALCLILATEDBY: BR DATE: 10/2021
Area or L
11548
396
940
364
68 4. 25

5. 9
g.s
11548
145
37 12
180

5.4 11548
#/ft or
W or H #/ft'2
120.00
120.00

75.00 11
85 163
163
163

91.9 o
o
o
150
225
225
75 163

45.8 o
o
o
W/1000
(kips)
1385.8

47.5 70.5

0.0 0.0
1503.8

23.6 34.1

18.2 18. 0

19. 2
1061.3

0.0 117.5

45.0 14.6

72.9 8.1
528.9

0.0 0.0

0.0 1961.4
186
CC 05-03-2022
186 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.3l861www.m-me.com
JnR 21143.P5CupertinoCityHallEQEval
SHEET N(j 0F
CALCULATED BY BR nATF
CHECKED FIY rlATF

SCAI F
7--f-
' 16r. i,b cahxc. aea-i
4 !El 81
C-O-G-= 27-12:

Ground floor = 12

29.1 feet
feet
feet
187
CC 05-03-2022
187 of 1033
NOrth 1008
Souttt 1008
Total 2016 in'2
188
CC 05-03-2022
188 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me-com
JOR
211 43.P5 Cupertino City Hall
SHEET NO.

CALCULATED FIY BR nATF
CHECKED BY r)ATF

SCAI F
N
:Totat
LTotaf
[1(ft} L2(ft) ' (it)

32.7 u 44.7 -

48.5 24$ 73 .
104.8'
20167 inA2 189
CC 05-03-2022
189 of 1033
211 43.P5 Cupertino City Hall
$ Hazards by Location
Search Information
Address: 10300 Torre Ave, Cupertino, CA 95014
Coordinates: 37.3188973, -122.0286498
Elevation: 229 ft
Timestamp: 2021-08-25T20:50:54.2152
Hazard Type: Seismic
Refererice Document: ASCE41-17
Site Class: D-default
Custom Probability:

Horizontal Response Spectrum - Hazard Level BSE-2N Sa(g)
o 2 4 6 8 10 12 Period (s)
Hazard Level BSE-2N
Name
SsUH
CRS
SsRT
SsD
SS
Fa
SXS
SIUH
CRI
SIRT
SID
SI
F
SXI
Value

2.34 0.923

2.159

1.986

1.986

1.2 2.384

0.944

0.904

0.854

0.708

0. 708

1. 7
I .204
Description
Factored uniform-hazard spectral acceleration (2% probability of exceedance in 50 years)
Coefficient of risk (0.2s)
Probabilistic risk-targeted ground motion (0.2s)
Factored deterministic acceleration value (0.2s)
MCER ground motion (period=0.2s)
Site amplification factor at O.2s
Site modified spectral response (0.2s)
Factored unfform-hazard spectral acceleration (2% probability of exceedance in 50 years)
Coefficient of risk (LOs)
Probabilistic risk-targeted ground motion (l.Os)
Factored deterministic acceleration value (1.Os)
MCER ground motion (period:'1.Os)
Site amplification factor at I.Os
Site modified spectral response (1.Os)
Hazard Level BSE-1N
Name Vague
SXS
SXI

1.589

0.803
Description
Site modified spectral response (0.2s)
Site modified spectral response (1.Os)
Hazard Level BSE-2E
Name Value DescripUon
190
CC 05-03-2022
190 of 1033
211 43.P5 Cupertino City Hall
SS 1.687 MCER ground motion (period=0.2s)
Fa 1 .2 Site amplification factor at O.2s
SXS 2.025 Site modified spectral response (0.2s)
SI 0.656 MCER ground motion (period=1.Os)
Fv 1 .7 Site amplification factor at 1.Os
SX1 i.115 Site modified spectral response (LOs)
Hazard Level BSE-IE
Name Value Description
SS 0.873 MCER ground motion (period=0.2s)
Fa 1.2 Site amplification fador at O.2s
SXS 1.048 Site modified spectral response (0.2s)
Sj 0.313 MCER ground motion (period=1.Os)
Fv 1.987 Site amplification factor at I.Os
SX1 0.623 Site modified spectral response (1.Os)
TL Daa
Name Value Description
TI 12 Long-period transition period (s)
The results indicated here DO NOT reflect any state or local amendments to the values or any delineation lines made during the building code adoption process. Users should confirm any output obtained from this tool with the local Authority Having Jurisdiction before proceeding with design.

Disclaimer
Hazard loads are provided by the u.s. Geological Survey Seismic Desiqn Web Services.

While the information presented on this website is believed to be correct, ATC and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in the report should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output or this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the report. 191
CC 05-03-2022
191 of 1033
MME JOB: 21143.P5 Cupertirbo City Hau Eval
224WalnutAve SHEETNO.: OF:

Santa Cruz, CA 95060 CALCULATED BY: BR DATE: I 0/2021 831-426-3186
TIER I ANALYSIS (ASCE 41, SECTION 4.4)
Building - Cupertino City Hall
# of Stories 2
Hazard Level - BSE-1E Immediate Occupancy
Seismic Coeficients - From ATC Hazard by Location Web site Ss= 0.873
SI= 0.313
Site Class= D (default) Fa = 1.2
Sxs= 1.048 Sxl= 0.447
Fv = 1.4
Period Determination Section 4.4.2.4
hn= 29.1 feet height above base to highest level of the structure Direction 1
Structure type = All other stnictural systems
Ct= 0.02
e= 0.75
T = Cttln'= 0.251 sec
TI= 12.O sec
Pseudo Sesimic Forces Section 4.4.2.1
V=(C * Sa) *W
Sa = Sxl/T (but < Sxs)
C= Table 4.7
Sa= Sxl/T (but < Sxs) =
(C* Sa) =
Level Seismic Weights
4 3
2 Roof 1002.O Kips
'a Floor 1 2012.7 Kips
Total 3014.7 Kips
Direction 'l
Direction 2
Vl=C*Sa*W=
V2=C*Sa*W =
Eq 4-1
Eq 4-3
Direction 1

1.000

1.048

1.048

1.048 " 3014.7 =

1.048 " 3014.7 =
Direction 2
All other structural systems

0.02 0.75

0.25'l sec Eq 4-4

12.O sec
Direction 2
1 .000
I .048

1.048
3158.2 Kips
3158.2 Kips
192
CC 05-03-2022
192 of 1033
MME JOB: 21143.P5 Cupertino City Hall Eval
224WalnutAve SHEETNO.: OF:

SantaCruz,CA95060 CALCULATEDBY: BR DATE: 10/19/2021 831-426-3186
TIER I ANALYSIS (ASCE 41, SECTION 4.4)
Building Cupertino City Hall
Pseudo Sesimic Forces (Cont)
Verticaf Distribution of Seismic forces
Fx:CvxV
Cvx= wxhxK k= 1,0
2Wihi
Section 4.4.2.2
k= 1 for buildings 6 stories or fewer
Strength Design Loads for Main Seismic Force-Resisting System Level W Hx wXhxK
4 - O.OKips O.Ofeet 0
3 - O.OKips O.Ofeet 0
2 Roof 1002.0 Kips 29.1 feet 29158
I Floor 4 2012.7 Kips 12.O feet 24152.4
Total 3014.7 Kips 53311 Kips
Cvx

0.00 0.00

0.55 0.45
I .00
-N/S
Story Shear
rX=c,,v
0 Kips
0 Kips
1 727 Kips
1431 Kips
3158 Kips
E/W
Story Shear
F%C.V
0 Kips
0 Kips
1 727 Kips
1431 Kips
3158 Kips
Average Stress in Shearwalls
Ms= 1.5 Tabfe 4-8 Immediate Occupancy
North South Direction
Level :EFx
4 0 Kips
3 0 Kips
2 Roof 1727 Kips
I Floor 'l 3158 Kips
Shearwall Forces
Fsw =lFX/Ms
0 Kips
0 Kips
'1 152 Kips
2105Kips
Aw
0 inA2
0 inA2
2700 in'2
30182 in'2
Shearwall Stress
v avg = Fsw/42

0.000 Kips/in'2

0.000 Kips/in'2

0.427 Kips/in'2

0.070 Kips/in'2
Vsw =

0.11 K/inA2
OK
OK
NG
OK
East West Direction
Level IFX
4 0 Kips
3 0 Kips
2 Roof 1727 Kips
1 Floor 1 3158 Kips
Shearwall Forces
Fsw =lFx/Ms
0 Kips
0 Kips
1 152 Kips
2105 Kips
AW
0 inA2
0 inA2
2016 in'2
20167 inA2
Shearwall Stress
v avg = Fsw/Lsw

0.000 Kips/in'2

0.000 Kips/in'2

0.571 Kips/in'2

0.104 Kips/in'2
Vsw =

0.11 K/inA2
OK
OK
NG
OK
193
CC 05-03-2022
193 of 1033
MME
224 Walnut Ave
Santa Cruz, CA 95060
831-426-3186
JOB: 21143.P5 Cupertino City Hall Eval
SHEETNO.: OF:

CALCULATEDBY: BR DATE: 10/2021
TIER I ANALYSIS (ASCE 41, SECTION 4.4)
Building - Cupertino City Hall
# of Stories 2
Hazard Level - BSE-2E Life Safety
Seismic Coeficients - From ATC Hazard by Location Web site Ss= 1.687
S1= 0.656
Site Class= D (default) Fa = 1.2
Sxs= 2.024 Sxl= 1.115
Fv=l.7
Perjod Determination Section 4.4,2.4
hn= 29.1 feet height above base to highest level of the structure Direction I
Structure type = All other structural systems
Ct= 0.02
u= 0.75
T = cthnv= 0.251 sec
TL= 12.Osec
Pseudo Sesimic Forces Section 4.4.2.1
V=(C * Sa) *W
Sa = Sxl/T (but < Sxs)
C= Table 4.7
Sa= Sx1/T (but < Sxs) =
(C* Sa) =
Level Seismic Weights
4 3
2 Roof 1002.O Kips
f Floor 1 2012.7 Kips
Total 3014.7 Kips
Direction 1
Direction 2
V'l=C*Sa*VV =
V2=C*Sa*VV =
Eq 4-1
Eq 4-3
Direction I
'I .000

2.024

2.024

2.024 * 3014.7 =

2.024 ' 3014.7 =
Direction 2
All other structural systems

0.02 0.75

0.251 sec Eq 4-4

12.O sec
Direction 2
I .000

2.024

2.024
6103.O Kips
6103.O Kips
194
CC 05-03-2022
194 of 1033
MME JOB: 24143.P5 Cupertino City Hall Eval
224WalnutAve SHEETNO.: OF:

SantaCruz,CA95060 CALCULATEDBY: BR DATE: 10/19/2021 831-426-3186
TIER I ANALYSIS (ASCE 41, SECTION 4.4)
Building Cupertino City Hall
Pseudo Sesimic Forces (Cont)
Vertical Distribution of Seismic forces
Fx=CvxV
Cvx= wXhXK k= 10
:2Wihi
Section 4.4.2.2
k= 1 for buildings 6 stories or fewer
Strength Design Loads for Main Seismic Force-Resisting System Level W Hx wXhx"
4 - O.OKips O.Ofeet 0
3 - O.OKips O.Ofeet 0
2 Roof 1002.0 Kips 29.1 feet 29158
1 Floor 1 2012.7 Kips 12.O feet 24152.4
Total 3014.7 Kips 533'lI Kips
Cvx

0.00 0.00

0.55 0.45
I .00
-N/S
Story Shear
Fx:C.V
0 Kips
0 Kips
3338 Kips
2765 Kips
6103 Kips
-E/W
Story Shear
Fx=C.V
0 Kips
0 Kips
3338 Kips
2765 Kips
6103 Kips
Average Stress in Shearwalls
Ms= 3.O Table 4-8 Life Safety
North South Direction
Level IFx
4 0 Kips
3 0 Kips
2 Roof 3338 Kips
'l Floor 1 6103 Kips
Shearwall Forces
Fsw =lFX/Ms
0 Kips
0 Kips
1 113 Kips
2 034 Kips
Aw
0 inA2
0 in'2
2700 inA2
30182 inA2
Shearwall Stress
v avg = Fsw/42

0.000 Kips/inA2

0.000 Kips/in'2

0.412 Kips/inA2

0.067 Kips/in'2
Vsw =

0.11 K/in'2
OK
OK
NG
OK
East West Direction
Level IFX
4 0 Kips
3 0 Kips
2 Roof 3338 Kips
1 Floor I 6103 Kips
Shearwall Forces
Fsw =lFX/Ms
0 Kips
0 Kips
1 '1 13 Kips
2 034 Kips
AW
0 inA2
0 inA2
2016 inA2
20167 inA2
Shearwall Stress
v avg = Fsw/Lsw

0.000 Kips/in'2

0.000 Kips/in'2

0.552 Kips/in'2

0.101 Kips/in'2
Vsw =

0.11 K/in'2
OK
OK
NG
OK
195
CC 05-03-2022
195 of 1033
MME
224 Walnut Ave
Santa Cruz, CA 95060
831-426-3186
JOB: 21143.P5 Cupertino City Hall Eval
SHEETNO.: OF:

CALCULATEDBY: BR DATE: 10/2021
TIER 1 ANALYSIS (ASCE 41, SECTION 4.4)
Building - Cupertino City Hall
# of Stories 2
Hazard Level - BSE-2E Collapse Prevention
Seismic Coeficients - From ATC Hazard by Location Web site Ss= 1.687
S1= 0.656
Site Class= D (default) Fa = 1.2
Sxs= 2.024 Sx1= 1.115
Fv=1.7
Period Determination Section 4.4.2.4
hn= 29.1 feet height above base to highest level of the structure Direction I
Structure type = All other structural systems
Ct= 0.02
13= 0.75
T = Clhn"= 0.251 sec
TL= 12.Osec
Pseudo Sesimic Forces Section 4.4.2.1
V=(C * Sa) *W
Sa = Sxl/T (but < Sxs)
C= Table 4.7
Sa= Sx1/T (but < Sxs) =
(C* Sa) =
Level Seismic Weights
4 3
2 Roof 1002.O Kips
* Floor 1 2012.7 Kips
Total 3014.7 Kips
Direction 1
Direction 2
Vl=C*Sa"W =
V2=C*Sa"W =
Eq 4-'1
Eq 4-3
Direction I

1.000

2.024

2.024

2.024 " 3014.7 =

2.024 " 3014.7 =
Direction 2
All other structural systems

0.02 0.75

0.251 sec Eq 4-4

12.O sec
Direction 2
I .000

2.024

2.024
6103.O Kips
6103.O Kips
196
CC 05-03-2022
196 of 1033
MME JOB: 21 143.P5 Cupertino City Hall Eval
224WalnutAve SHEETNO.: OF:

SantaCruz,CA95060 CALCULATEDBY: BR DATE: 10/20/2021 831-426-3186
TIER I ANALYSIS (ASCE 41, SECTION 4.4)
Building Cupertino City Hall
Pseudo Sesimic Forces (Cont)
Vertical Distribution of Seismic forces Section 4.4.2.2 Fx:CvxV
Cvx= wXhxK k= 1.O k= 1 for buildings 6 stories or fewer :}Wihi
N/S
Strength Design Loads for Main Seismic Force-Resisting System Level W Hx wxhx"
4 - O.OKips O.Ofeet 0
3 - O.OKips O.Ofeet 0
2 Roof 1002.0 Kips 29.1 feet 29158
1 Floor I 2012.7 Kips 12.O feet 24152.4
Total 3014.7 Kips 53311 Kips
Cvx
0,00

0.00 0.55

0. 45

1. 00
Story Shear
Fx=C.V
0 Kips
0 Kips
3338 Kips
2765 Kips
6103 Kips
E/W
Story Shear
F,:C,V
0 Kips
0 Kips
3338 Kips
2765 Kips
6'l03 Kips
Average Stress in Sheanualls
Ms= 4.5 Table 4-8 Collapse Prevention
North South Direction
Level IFx
4 0 Kips
3 0 Kips
2 Roof 3338 Kips
1 Floor 'I 6103 Kips
Shearwall Forces
Fsw =IFx/Ms
0 Kips
0 Kips
742 Kips
1356 Kips
Aw
0 inA2
0 in'2
2700 in'2
30182 inA2
Shearwall Stress
v avg = Fsw/42

0.000 Kips/in'2

0.000 Kips/in'2

0.275 Kips/inA2

0.045 Kips/in'2
Vsw =

0.11 K/in'2
OK
OK
NG
OK
East West Direction
Level IFx
4 0 Kips
3 0 Kips
2 Roof 3338 Kips
I Floor 1 6103 Kips
Shearwall Forces
Fsw =lFX/Ms
0 Kips
0 Kips
742 Kips
1356 Kips
AW
0 inA2
0 in'2
2016 in'2
20167 inA2
Shearwall Stress
v avg = Fsw/Lsw

0.000 Kips/in'2

0.000 Kips/in'2

0.368 Kips/in'2

0.067 Kips/in'2
Vsw =

0.11 K/in'2
OK
OK
NG
OK
197
CC 05-03-2022
197 of 1033
( ME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com
JOB21143.P5; Cupertjnoqity Hall
SHEETNO. OF
CALCULATEDBY " TE -

CHECKED BY

SCA) F
t a _A r; z..>
rt_'r t'-y""";""""""-'1
%'4 &l !sr " i'A"s&:'-f.r'aa7:!!Ja 7oaan € :'\7L'-'hah-A_______""",*"m_3,"'lli!'-"'Pi-=" R_."'aJ:sTjE!%'L____'Ca'W'_" vJ:b..'4e4tl_'hd s,q J_ ryv x: > i'V 's a4 ;'4 :f""h
..: W.. i..'ataJ"W %J'!,'e;t': a € -J i_______p__i 37g!_':7,,] h'%-rf %khk-'t'i':i
iA'x
I
lm
i A
'zl
' A ,
Ill
1 i
l
(J-"
d :
d
Ce> %
; ,>. l! '
i G'
I
" ='= '-'-"'
7 . (p ,
a b j
: '4'i I
80 M"'
('>';"@fl !?.'
_y t;
"?-'ba 'aQCL'
I '
"F-';"4pvsEl'iai
i
"b" aA i'2&'
i
.____ff
!'4. "'l
ll
t
'2,-
.-... ...... ....!
-'-$-p,o'-'-'- - ]
; 4: e>, '
! '4 4: .@
I , ./%
I _,
I J, b
iI
'ls:\)'A'aa'a'.,-'gZe2ts'
;*4 € !'# ib*h"#
I :,
t'zi
C/>.

I
NOTE. :
198
CC 05-03-2022
198 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com
J,, 21143.P5 Cupertino City Hall
SHEET N('}

CALCULATED FIY BR

CHECKED BY
r)ATF
nATF
SCAIF
,4i
I
I
'i " a) !' i
B %5k5,,F, ZtA':'% ,, !@{, 04;
199
CC 05-03-2022
199 of 1033
't%tt. a':

Civil + Strudui ;ngineering
224 Walnut Avenue, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com
,l,, 215 43.P5 CLipertino City Hall
SHEET Nn
u CALCULATED RY B R nATF
CHECKED BY r1ATF
I a"'*"'i'a""""""'-""""""""""'-"-"""""""""-""""""'-""-""' """"'-"-"-'-""""""""-""""'-""""""""""'-'-"-------"''-""---"-"""""-" V% ;'i
.' [ A u @s,., ,J+, % i.a 's s ' . a
- ': ri')%r;..j'7LA""'!l'f'-,-7.i;t,J45cds,
:j
I
I
,/='#
"%mJ' ., . 2,, ! sl> Z&,,, <' ,,,], ,' ..-.. fff,i,-, .7, ,7 a. ? m,a, _ ' aE-===,, : j - > "73 'F'? f:5,;3) - # I
*
h r,-=,,,=,<i - 2 :?-,_ ! a
r@7 !;=,---. " "'!":p '
I
j. a'a 7"'' < ,#, ,, ,, , 7 /]?y,E, =-i, t, ,,a_ , 7, ., .q, :J,%:,, 7,=7, ,a.l4:, :, 't+; 7,j,. 5 .,,j. yattJ! , ,, , , , , ., = , 0'+ , !: ;..; affl .
a['-t- r-a !- - '3!'-!"- 7 Nr-]- " 'i , th \-.f'
' ""1'(,y4C_ i_ f..i rl-"j_ / _,< a a'4 Sl T"?E, 'E, L' [s -y'%A_7. A ,!"" t J""' - ,;" i f"i .'7" #,h
I
,!=F ,,- . ,-=, [,-. ===-=.,- "a '-; ,=2 2 ' !J = ',, ' I I
I
,? h '!', ! ' -a=.-. t. ,= 'Q
l,,
.. ' %? . x ." :x +. -k a I % .J_ ? dJ- _ .= .. - _ a "-,',_ o !l_ "-!!: " " - " "' -
< a'
. . %?.
d4 " it'
C
_ , ._, i %0:=;4._
% '< ; +
d.,' ! #% 4
€ oa-':"'Ar': x € ' 7'3-y 4',>i")""rf, o.> J!3;7 '){:a+ @ ._ ,J . % ) %.. ,/' %t
#; '; t - "i ) I .:, ' a/(a' ,< '-',a @ , .. i- i t+Y , )) /4 ,
I 4 .. (
-' < i
f '- ,,_ .i4. i. - . .'; a, ';, "'7 ij 9 0 ";=_ _ r= A.( -p af 0 l
200
CC 05-03-2022
200 of 1033
(.,,4E
Civi! + Eng"rxeering
224 Walnut Avenue, Suite B
Santa Cruz, CA 95060
83I.426.3186 i vrw.m-me.com
Jn, 211 43.P5 Cupertino City Hall

SHEET NO
BR
CALCULATED BY r)ATF

CHECKED FIY I)ATF
%,'__3;(_4z's_,4 A7yt,3-1.-.dy4,,p-<77 "-]t%'4"'i"i's _. ' ' -t'#' " : Z' =. :, 18 $., i" _ ,]"€ ,,7... f%J, ; J 4= -+&-34+-a.. I y -T" : '4"' s ' : "7" 4' f" ;..A= 4's ! (
: % J-J v lf 'J' =y, 2 J l' :. .l #,',, !, I 'a.]JV__o" t,a!'l"a""]"A" alill/aTlaro"a'a-"Z".-,0"'a':I-L--'-"oZaax:;m- "'r{iA'?>,x-gH(;:""hp.- x*",ts,--t-_ if s o ,z a., - ,_ - - , , * _+. , /. , .,a ' d' J a 7 ?., " >= , i y _. / j) k
'a'?a y,'(";@.p,4qa.0.7y%,Jaa',;]_tl,,)';;p;i7..,';;. 'AP 4'r2-! m J ' ao 'i, kl.rt_,' H*,'a; l J"+ rf r7 @!_.0 a'+ ii ; -.a'!:: (, - % ,,_,. a.. m' sa, ,,_. "; "-%t . . "Jy, : 7%, _ C, ff" 2- 7" = ) ' Tl- ':.,
, ?,? ; t. 7E;,i I
-a,:;,4.%,,,&, ,r.. : 0, . rJ.. , c,
I y-
1: qL-,tlrE,0J,; ;',:L:::"!75 /""';',?sa"asLIZ{J,I"')Ji'.,Xl-?c')ja ,," 4"':l!ry,,.,""")aai'l424,"" I
I
' i".,a:F' ..p<_""t5- ; 'tri %:;,-@t,_ p_aa7-i%a;...yz3>_" 3"g> 5__;y3 : 0 i % -I ' d J
I a k. P -. -- f- ' 1, & l,z -> t' r4,_ .F , 5 P., : !>. y..4 b ye g=r-J -"-'t"r=' P!-Vt
' , -., =l, .,=,= -= "-,.T' "' "J,:,"',
'- --- h "= - ==-'-!='-- ='Qp)"" .,=-.=,,I " .,'sk- -- " B% ,
Jl ; 'lAt N
f J
:. -= a
,<z ' b ) *
-.t2 ! s I - -
,sl , <-, _ 5 P.,,,,, gl, , - ,],.,, : . . YTh , . y:a !: vs--- ;75; E':"A'h-e;" r:-;a)""ffl- - - ! - ' a o:':----J'
" r-Z" aa i, S 0] 6P ( X, !, s,, ,,,h, I!J; ' ", i" lr '3,,=.,= - '-" ' X"! - L = ! ? 2 !' 'a" '- - - J -"' li a aL- l/' % - + ! ,,-- :!' - j =- - ---_al % i < ' - - fi,/"-. y " ' sa & - - ' - " ,3a y,, , , ! ,_, , - ,....., ,.,s., 'a _ , D ',/ l 4 x- ) - 4 ? ." "
J ) (= k 'a - ='li_ -'
I <_---yx-I .

I .___..I-_-s:--_T__al%. -a,,-4%,lal cll,,. ,:,i_l,,_...,!a_'-' 4,s..,,h%0_,, ?-.'t,,"',f,A.(,' a,. ',/.'a (us"!" '
't(__ : '- 7' (.q) +-y ; a=ri a< i. <_ )A % - - o -" - _ %
24 -;'yt.",,'-:,-"=,'<"==':ol-'=j Q'>-iy)a=:o,====;=,a-='7Hig,,==,"' a'a' x":';a-- ""-"+J ' 201
CC 05-03-2022
201 of 1033
Nb .c
ii"i.B 21143.P5 COpertino City Hall
Gs
Civil + StruduraJ Eng'neering
y 224 Walnut Avenue, Suite B
Santa Cruz, CA 95060
831.426.31861 www.rn-me.com
SHEET N(l
!=!] ] CALCULATED BY

CHECKED BY
BR
rlATF
nATF
""-"' "'-'-"""':l
'-=J !-$=, ,,'- JL4-'1-)]-'-k'C_
./"a'a..0-. '!X A.. ,':. A.--_,y.' !, A,, li
i
7 . .
=-s-)'a"g!'*"Q si a @s'(-yt-.... . t I
a-i ra, ka' X f ' a'aX f r 'sh m, t., %a a
'-'="- '-!J[=-A F o t ' = " '!- 'a , '= -' j " 7 - ' .. -i T'a<-A-.-,, '%-Jp,J".-t: J"-:7tt";V5') '? -%l"'- ' !+=+ _-_ #&mW# d#&a,-A4-.
i k4 'z ' - 2'J t
"T4r=,,==,w,.[-'=p= y_vi=-=rA'=,*<,%= "'s,"j,;'iy' ,
I " "'
r'>S -' x=g < < g y 3 a A ._ F f (f'A t q ei C,L 7: t,; <J 7
/':'I ?' ":"i' !'tJ E - h'; (Z 'T " """ ' (" R":-* "s":"a 7"' f'J Q C !. : f-J ,'. L. !JA-', "'X' 7 kl . i,#TJ
?:: t-=l-at = c G '!_ (,'2_ -. '< r,,- ',; ; ) - S" k Q E5, = 7-@ 2" ', O <. '-:> Cv 8'-; ', " L 2 " ./' a---, '% " " !A -
C A-j,i A : 'L! f's' J' 7, y. f" , .. 7% ,-2L,. c , ,. : ,7' , , T'a ,_:=a%7 ' :, ;0] ml,,_ *.
4'*-" ; I]
"a"aaP ( r-'a'- ,7'P,%.. "'@"' € )""""':"'L' "a"" f%"'j%X"'7' j
-st+:.a, :,r'- ts'-t: ] % - %? a
,,_;it,,z,';,,.: t',A7__.,=c'q </.J.),(<-.-i 51T())' zy_,1,<,0,1,A4%,laA;- I 7I ', <9 7. Z , ' , 1- S- '-
I
_;*:_,_:" a, -"'.' <" !" j'
I D:-"?-_. -. -'- a-" \qs " !=== r=!6._7 ,, , , _ I i
i
I
I
I
I
I
i
202
CC 05-03-2022
202 of 1033
@J M m Iamaq
!f
- ' " 'i ,
J5 J
t-:ifti PROFIS Engineering 3.1.1
21143.P5 Cupertino City Hall
www.hilti.com
Company:

Address:

Phone I Fax:

Design:

Fastening point:

M-ME
224 Walnut Ave
831-426-3l861
Concrete - Oct 7, 2021
Upper floor Shearwall to Diaphragm Conn
Page:

Specifier:

E-Mail:

Date:
[email protected]
10/7/2021
Specifier's comments:

I Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 36 7/8 Item number: not available
Additionalplateorwasher(17.6.2.1.3): dpla,=0.100in.,tpla,=0.l00in.

Effective embedment depth: hef = 9.099 in., Hef,17.6.2.1.3 = 0.000 in.

Material: ASTMF1554
Evaluation Service Report: Hilti Technical Data
Issued I Valid: - I -
Proof: Design Method ACI aal8-"19 / CIP
Stand-off installation:

Profile:

Base material:

Reinforcement:

Seismic loads (cat. C, D, E, or F)
cracked concrete, 3000, fc' = 3,000 psi; h = 120.000 in. tension: not present, shear: not present;
edge reinforcement: none or < No. 4 bar
Tension load: yes (17.10.5.3 (d))
Shear load: yes (17.10.6.3 (a))
Geometry [in.] & Loading [kip, ft.kip]
4 Z
x
Input data arm resuRs mur+t be checked for mrformity wai the emsting oonditions and for plausibility! PROFIS Engineering ( c )2003-2021 Hitu AG, FL-9494 Sdiaan HiRi is a regffitered Trademark of HilU AG, Sdiaan 1 203
CC 05-03-2022
203 of 1033
211 43.P5 Cupertino City Hall
f w m ffll
j,ill:.2i J5 m I!i
Hilti PROFIS Engineering 3.1.1
www.hilti.com
Company:

Address:

Phone I Fax:

Design:

Fastening point:

1.1 Design results
Case
I
M-ME
224 Walnut Ave
831-426-3l861
Concrete - Oct 7, 2021
Upper floor Shearwall to Diaphragm Conn
Page:

Specifier:

E-Mail:

Date:

Description
Combination 1
Forces [kip] / Moments [ft.kip]
N = 0.000: Vx = 1.700: Vy = 0.000;
M, = 0.00000: My = 0.00000; M, = 0.00000:

Seismic
yes
[email protected]
10/7/2021
Max. Util. Anchor [o/o]
95 2 Load case/Resulting anchor forces
Anchor reactions [kipl
Tension force: (+Tension, -Compression)
Anchor Tension force Shear force
q o.ooo "i.700
Shear force x

1.700
Shear force y

0.000
max. concrete compressive strain: - [%o]
max. concrete compressive stress: - [ksi]
resulting tension force in (x/y)=(0.000/0.000): 0.000 [kip} resulting compression force in (x/y)=(0.000/0.000): 0.000 [kipl 3 Tension load
Steel Strength"
Pullout Strength"
Concrete Breakout Failure"
Concrete Side-Face Blowout, direction "
Load "ua [kipl
N/A
" highest loaded anchor "anchor group (anchors in tension) Capacity * Nn [kipl Utilization PH = Nua/l Nn

N/A N/A
Status
N/A
N/A
N/A
fSl/A
Input data and results must be checked for oonformity mth U'ie existing oondions and for plausibility! PROFISEngineering(c)2003-2021HiltiAG,FL-9494Sdiaan HiRiisaregisteredTradernarkofHiRiAG,Sdiaan 2 204
CC 05-03-2022
204 of 1033
211 43.P5 Cupertino City Hall
Hilti PROFIS Engineering 3.tl
www.hilti.com
Company:

Address:

Phone I Fax:

Design:

Fastening point:
4 Shear load
M-ME
224 Walnut Ave
831-426-31861
Concrete - act 7, 2021
Upper floor Sheanuall to Diaphragm Conn
Steel Strength"
Steel failure (with lever arm)"
Pryout Strength"
Concrete edge failure in direction x+"
Load vua [kip]

1.700
N/A

1.700

1.700
" highest loaded anchor "anchor group (relevant anchors)

4.I Steef Strength
Via "a Oa6 "se,vfuta
I Vsteel > Vua
ACI 318-19 Eq. (17.7.l.2b)
ACI 318-19 Table 17.5.2
Variables
"se,V ['n-2]

0.46 Calculations
futa [ksi]

58.000
vsa [kip]

16.078
Results
Vsa [k'P]

16.078
4'steel

0.650
+ Vsa,eq [k'P]

10.450
vua [kip]

1.700
Page:

Specifier:

E-Mail:

Date:

Capacity I Vn [kipl Utilization i3y = Vug/l Vn

10.450 17

N/A N/A

8.068 22

1.793 95
[email protected]
10/7/2021
Status
OK
N/A
OK
OK
Input data and resuLt must be checked for oonfomiity mth Uie mimng oondtHons and for plauaibilityl PROFISEngineering(c)2003-2021HNtiAG,FL-9494Sdiaan t41tiisaregmteredTrademarkofHilUAG,Sdiaan 3 205
CC 05-03-2022
205 of 1033
21143.P5 Cupertino City Halla m{ m R
,] J ]
=i
.aJ
!
H.ilti PROFIS Engineerii'ig 3.1.'l'
www.hilti.com
Company:

Address:

Phone I Fax:

Design:

Fastening point:

M-ME
224 Walnut Ave
83"l-426-31861
Concrete - act 7, 2021
Upper floor Shearwall to Diaphragm Conn
Page:

Specifier:

E-Mail:

Date:

4.2 Pryout Strength
'l' vcp > vua
"Nc See ACI 318-19, Section 17.6.2.1, Fig. R 17.6.2.1(b) 2 ANcO a 9 hef
q ed.N = 0.7 + 0.3( - ) < 10
ACI 318-19 Eq. (l7.7.3.la)
AC1318-19 Table 17.5.2
ACI 318-19 Eq. (17.6.2.1.4)
ACI :318-19 Eq. (l7.6.2.4.1b)
ACI 318-19 Eq. (17.6.2.6.1b)
ACI 318-19 Eq. (17.6.2.2.1)
Variables
kcp
2 hef [in.]

8.000
ca,min [in.]

3.000
W c,N
I .000
cac [in.] Aa

1.000
f'c [psi]
3,000
Calculations
sciin.j
144.00
Results
vcp [kip]

11.526
ANCO ['n-2]
576.00
lncrete

0.700
W ad,N

0.775
4'seismic
'i .ooo
'!cp,N
"i .ooo
Inonductile
I .000
Nb [kip]

29.745
(I) vcp [kip]

8.068
Vua [k'P]
I .700
[email protected]
10/7/2021
Input data and resutts must be diecked for oonfomitty with the existing axdns and for plausibilt§! PROFISEngineering(c)2003-2021HimAG,FL-9494SCtlaan HiltHsaregffiteredTrademarkofHfitiAG,Sdiaan 206
CC 05-03-2022
206 of 1033
21143.P5 Cupertino City Halll M M k Y{
!',.a..-!Ll
-l-'- " - "-----
W !
Hilti PROFIS Engineering 3.1.1
www.hilti.com
Company:

Address:

Phone I Fax:

Design:

Fastening point:

M-ME
224 Walnut Ave
831-426-31860
Concrete - act 7, 2021
upper floor Sheanuall to Diaphragm Conn
Page:

Specifier:

E-Mail:

Date:

4.3 Concrete edge failure in direction x+
I Vcb > Vua
Vc See ACI 318-19, Section 17.7.2.1, Fig. R 17.7.2.1(b) 2 AVcO a 45 ca1
ll/ e,V = 0.7 + 0.31 ; ) < 1.0
ACI 318-19 Eq. (l7.7.2.1a)
ACI 318-19 Table 17.5.2
ACI 318-19 Eq. (17.7.2.1.3)
ACI 318-19 Eq. (17.7.2.4.1b)
ACI 318-19 Eq. (17.7.2.6.1)
ACI 318-al9 Eq. (17.7.2.2.1b)
Variables
cal [in.] ca2 [in.] ' c,V

3.000 12.000 1.000
ha [in.l
120.000
le [in.]

7.000
Aa

1.000
da [in.]

0.875
f'c [psi]
3,000
'! parallel,V
I .000
Calculations
"Vc [in.2]

40.50 "VcO ['n-2]

40.50 '! ed,V

1.000
'l' h,V

1.000
Vb [kipl

2.561
Results
vcb [kip]

2.561
Iconcrete

0.700
't'seismic

1.000
4anondudale

1.000
(l) vcb [kip]

1.793
vLla [kip]

1.700
[email protected]
10/7/2021
Input data am resub must be chedted for confomiity with the exbiting oondtUons and for plausibilttyl PROFIS Engineering ( c )2003-2021 Hilti AG, FL-9494 Sdiaan Hilti % a registered Trademark of HHU AG, Sdiaan 207
CC 05-03-2022
207 of 1033
21143.P5 Cupertino City Hall
I, Design Methoda Load & Resista.nce Factor Design (LRFD) I Connection Type, Lateral loading
l Fastener Type:

Loading Scenariot Single Shear - Concrete Main Member i Main Member: Angle of:i ,O
i Load to Graini
Connection Yield Modes
, Adjusted LRFD Capacity 49 lbs.

Bolt bending yield strength of 45,000 psi is assumed.

The Adjusted LRFD Capacity is only applicable for bolts with adequate end distance, edge distance and spacing per NDS chapter 11.

While every effort has been made to insure the accuracy of the information presented, and special effort has been made to assure that the information reflects the state-of-the-art, neither the American Wood Council nor its members assume any responsibility for any particular design prepared from this on-line Connection Calculator. Those using this on-line Connection Calculator assume all liability from its use.

The Connection Calculator was designed and created by Cameron Knudson, Michael Dodson and David Pollock at Washington State University. Support for development of the Connection Calculator was provided by American Wood Council. 208
CC 05-03-2022
208 of 1033
MME
J(IR
211 43.P5 Cupertino City Hall
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com

SHEET N(')

CALCULATED BY BR

CHECKED FIY
SCAIF
nATF
nATF
y,k!et'- .4
-""""" "L." F'u"!000
': " "' - - ,,', -% a)4 T 4 ri OECAlNCi
' +X mAa_eg5 .' _ _
, .(qOo,y%N4x>:,!,h,b. ,-,," - i._ - . I "iXXlai"aJ _@ !4 A ab, 7ri b,* sl ' 67{iQ'D. 't-'-
a orrn' )
q !6T:40 -",/
_-'-(ze< l& -"-"' - - ,- " ,'i,,,:' W5/,' 46:;!1'2,!in X_,V:,,' _%rCb,C,M+e,&ga ' '-.y . 7a>suva*swi';t"%ap"
%,, , + A4ib, a M'%'s';2:.
% "''@ 7
-l--a
% a
r q!k
Q!l';,"x!,% ME;E- P',.., ---.,a ' !
l" t)l'::"l FkC'K -- "itl
' ]l f I I 4s!4 m b-pi4-
4-',',' § x Fl" AiFge_ ! r! ) ! I 'stv' L(e"ii"EL!i,-'iG NllT"g --"o- ""-a 'i'l 't it *yZ'l. zo>!CiG'aoa'a'
.llilx-'a ii ') ' J
A; t.. b.ll,, .- _,, ,' i-i
OG'b-t-'e-ytzll=x'&
j_ -',"a T_ _
' :-' - a -" ,% .' - " -
,Ay
!6 b 31 a"""a's ,,_,+g tUhlLE=!?.
"""' "" - "-l ,d'CO!,4C, 6RiA[ '.4ALt, '
i ! l lor;; .4,s..- k;- van> :i xo iJ GWE&ga _5!AL'! 645!- _ '}J'= =
I
.1 ,
It_,
s-- A
@ecbu=i',hii-xLo"
-l
Connection at Exterior Connection at Exterior
Wall Columns Wall Columns
Q_- 'F'-'. 4 :'Ai".i"'4t"' H:'ca!':' 5},
'y(ThfZE'iV!:aaZpK'laa.a't-a
-'i"..-.......-..-..:........-..:.'...a...ir.*ii':si.vs+x=.:'.'i'ai'i""x'itv'ii 4"U'a""a'i "QIIY'-'YW3")-'!!'l'h'-gl-'-a!i(;7pl6Q(,@'10tC+, .. . *i .1,/r-l,'.;_-,, - 4;1-A (;> DeC-!'lF' . :S / s, , - ' , a _+ ._ _j _ =.= _ - r .i,za5.-a4-f;gr:".W,)b.5<,5 47 -' :' <y::4_ _l -r- . yl7p- I , -l "- T m, *t;e. w u a_+ " ' = -. _ I i
shreym A'MX . a _1,_ - tb 6 =l
""'u I -;, . "+ -=,.,'l -
'i =- nl
L2;'ag '- ;
7' A.!"j '
1 I
1-
i
,'ja""
l o !' .
"]
' -...L..
/" .

I
aJtr tr: r%lf 6bG-E PL, z7f...l' 5";l" 'T"' """ ='T "' al ll--tgk""ibcohziaebbh. 41"J'i:tbtn,,P,,,,"YFs'CK"'f-"=I'-' l'ill!1,1!llll' %io _v;bbyea:rttasare :'I----='.l-l I i I F ' III-'
209
CC 05-03-2022
209 of 1033
s,-.AE
224 Walnut Avenue, Suite B
Santa Cruz, CA 95060
831.426.31861 vtvtvv.m-rne.com
ant:i 21143.P5CupertinoCityHall
SHEET Nn

CALCULATED FIY
BR r)ATF
CHECKED RY r)ATF
j
=-. (!yO i,,l t='-j .4> F_:_.,.,',) ;z . 3: ;fi >7.7,t- y ,+, -asJ"':'a % P a "
r/,;p,k"";'++( [;,F"as?_, 'z:y>54* ';,T5,"i<;- %J%!:' f,r,, ,,!,,., X7Qa.M-y-4 f
'aa=t, . ,' aa .. ,:,. 2(?, r' , < r r:,,_ * ,/_,4 " !' *' , 'a===a, b . _- k
'
<
\'J"H'JXaa . 1,7" a'aa''4a 's_a L'Ya'-J %} '
'G=,": ?sf'--7 'M-"-=3 '9'%,p ' 2- i
I
!,lfl-A'7J._/:-. 4'--"!;:7',_
S P " V"% e F 'V ""! : )?, a- Q . L . a(
<;,,,h:03a._,,(:1 "r:;,rf%,a,;'1-,,5._.s <,x,0_<_
r4"(,tio4"J-a-'E._ i-,t'-fk'- ";?'a:aa'lfja'J/p'-"_7' / .3(pt5,,-_,p=,7>r>,y..,,, i.='-.-'=-i!<9 i
,,==' 7- ,, " Q : '-, .,", - - '.:: - '-r" ?) A-,fa' +. ., I
i
210
CC 05-03-2022
210 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.31861 www.m-me.com
2ii43.P5 Cupertino City Hall
JOR
SHEET Nn BR

CALCULATED BY

CHECKED BY
nATF
nATF
SCAIF
-l
xi
tm.'
E!
>J
71 ha * i
Ml
Thl
ril
Ml
t.al
mjl
[
l!'l
II
ff
('i
3 -'%
uil
']':
!!
l'll.-A
% I
it
.Th
i_ i
!€(', @lJ)
l')i
!.!-i
0 56
, ,) -_Y i<e-(rr.i, .. ..__ i
Dad
I
iiii L ii iii .'3-
aU ";i- %-!!
/ @ ")"d;!ex. I I
/ l'Ai
I
'r%
l' :. " ' 4
.,i
.(=b
14:
, i
'l""""""'
I
Xq'a'aa'
a
# A aaaa li
:

I
I
I
i%---
J
%! .
-%
/ < ial
6 ,no
'Th
?
.!

8.1. IL'l
fl
13 I
,Jl
\lil
l@
2"v i
,s'-.lQ'l Be'-4. [ l
e'- s0
('_( _...lb7,47.........71"x'J)
g,,t,5!! -. ,!,!
!1, 6'-7" ,_,F'-I" 1,,!7
l-"'l t' ' - " 4 ' j " 4 " j """= '="""" '='=""" """"""""""" " ffll"" da " i # (go' -o'
=-=-""18"l=ll=ll- " "' I """""""""""' """
.
@1,loqA +Lt auav,qig2 (t!ai===!)
-- -"' - '-' -'II
a "zllpll
<II
Sll
,zll
i.,,.. . .. . ol
211
CC 05-03-2022
211 of 1033
Civil +
224 Walnut Avenue Suite B
Santa Cruz, CA 95060
83'i.426.3!86 i www.m-rne.com
.XlFl 211 43.P5 9t-ipertino City Hall

SHEET N(')

CALCULATEDRY BR

CHECKED FIY
nATF
rlATF
j
I
I
I
7J i
I
7 i
:',z"a3a'-.a:]"'<-':t ;x,']"'a"aVa',t -<':Pa'_-lC.-_'l. i I T Y f-, :_ - p ,==,-.- 5 l-; - __-_= = Lr: 7:') ;,l ,= -'. F7':> ,"-' I - J.
4 ?JM '
i -+
I -
""'T B ;. <. -.a A-f +i , vi, a!'4 ' fl'7 ':j'ty ""T' !:! 'r' L 'QoJ 7 J . -/ , _ ++. ,tl >. (?]<i=, 7 " Q :s,.,l'ell' a-' !' '+aJ - -
'! k ":" <s . y .,>4. 7.
- ; a '- -'=
I
'. _ '2,h_ =,,,, .J B,-=,ti != (_,,_, T=, b R ! F o '== p==,,;,>rz '4 G 7-,, '-'- -,, =,' ;j' r, = ai "Q C8'3 = 9 -' s. ry.I ' _ r. 7 s . s'J 4. ,
:' ),l i .7 tk a. m i , 4. t:. _ i tt
I k I H I f ; - + a"" II /
I
I
1 I
i
I
I
I
I
i
I
I
i
i
212
CC 05-03-2022
212 of 1033
MME
JnR 21143.P5 Cupertino City Hall
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
83l.426.3l861 www.m-me.com
SHEET Nn

CALCULATED RY BR

CHECKED BY

SCAI F
nATF
nATF
.
;@ln. 14 u aia. 11 'l l _ia bsal Typlcal )' 11 Typical i i tl ti I
l-ii-:-E, ! z_!Iri Fi '-_,,7i_Jl -H
hbfai VarHcal bata sbawii di*+l bii Th* xm slz* as +$ia typical yaff!aol z!n*ortln43.

FiT TV?ICALCDRffilERRE1NFORCINGOETAIl,
CO L 's,i X N 5C IH" L" 'W/'U L E
MtJ2J,- O-- (,Oiffi, 917:E " vegr. !&lN,$.- .a-8E;i
4XC)1{N_[ ,"ii" "_"" _"" _ffi'A'
h
2 m
':';
c-%
C-'!,
C'3
, ffi " -th'A._-i .
!%rl.'i,"' (a,,
!'A'-i,% '
4 ,!1_
4 @ l:
k 5@
%
*@ :
* z .1
%
it '
' 1€ "
,- )1 )I
IJ
I.,, -
117::10-
"":"fk
I i
n t 5 dla. i"i
akn. R - 3 dis.
iiin.
.1
IIJ
%h
J
c-d-
/ # ei
i-
c.- (p
i<)i5!_4 :

I ]"17i'<.l! "4
.4
4 _4-
4,a,
: A,
%1,
42 '
4 Z , .a
J2
inn -
lI N
13ai'
q
'Ci
5,i
LL
l-
I,Q
u
L
c-%
C-'2
C-3
C,-4
G')
(.o(x-
i'2.;ffi,
, !(
!ia,'-. "
1',:'!5Q. ,
l';%, '
I,"!"';Q.
1/t%%"5,q.
!
4 }
Y
4'
4+
A
#G
%
4k<,
k' ( 'l
"'a'7 '
_ '.(p
%
49 '*2_
42 %
.4kz
l! 11
Il " -
II II
1) ::

It
(y it
T v p s c A L B a R B E N O D [ T a s t s kiQ7 p ' ,,,,, _, ,,, , !_0 r.:%a _ II ._ _ .ii ____ , ,, _%) ia. 1. _ 11 ._ _ , _, _ , _lill_t ffi. YpqS-:ge f f,- Il €e % rp"O.c. !t! Tff q ?.r;rT% L'-Q' of' 49pt4-;'t- -!- 2'-Q!1 %v.g 4.F;)e_JJ7! i'd r-:,oz ,_!AF 5tgs 4o@ ii 11,u ,->:3,, -4-* - - ----%-- ---J i'5a
i j
-l I a
+-:4 ) I - --- " i' i -l
'Y,, '4- - - -
--X------ a="'aa"a* /9f,,y!i: i ,lll" '=. T'itr-I It
-} ,-& 4-
l[ -J
I
%-- - - -_b
"'-A!2aCh"i'ai"'aC(.y"";'JJa'a_ ?i_-o"'q'EAL 5,4"':)!'1,'X& TYFiC.S,L COL'.f,","::-i
l'-if" - iLO"
i"'-""'=- -------- '
IiF.-! " I I uo . ,' ) . ' %]%,d ,- a ;,') . 4151/(' eq, mQc. oxiiMS I " """'-""""-""-'-----'-----'-"-"-""'-"""""""" " "-""""""""' """"-""---"-" _ _, J""-_,il!,"' Cl-EAR
'-. 1'2" '!,
1,lili"i'n't -t i. -
i Il ! ,_,__"'-Q_t- :- al ( II
4b ra_ 'rxz k ri_ aaifY ""
a . l)
i7
'<!:it.il"
zl
ill
ili
)'
t
- 416 Vtf.l @! l'ln(},C.
' ' 5 }5[t"a4 - @ I("' 0-6i
- " "Wp- 'O p-SrZ:J4 l'aLL
'gt=s'logcEiA!e.\;
,[ 4'CZ, 6',2_'F'g
I %4 j ,;,, . aNi s I
I lffl ?
I I: ' :: f'
i ,e;OMG- 6lAP' _ it . J
7'l
!, !]
5,.no< pawsd gzs4N
,, -2318(Or2GlNa IJ" 401
'L"',ra*ki= bt% wi,.1!
I (. .. v ! ] n 2
_ _ _% " _ 11%. . laid.
_l
F k,.,. u
a ' !" """ "" " _" a" '-'l' "' ) " a
..l ... .. .. .. .. -.. .. ..___ o' p, 4i( ? Dr'J1 l-.. ') ai 'l ' a .-t """'-'-""-
I
I -" 3'
i o"Ff-;ikama"':+=lJl,l'i!
y :'!iiii-I
Jul
a ' o"'-" I
"Th
; ,,
' -!
.j
j
4 -:a---g
0 ..")
-%__-,.

Q'a4 'l k -"':
;,g'== !
+"- p-:'=
-=;l i!_"i
%, ,!,,__,.
'V =""='i'Jl'lJ
-"="-' * -.'f
i; I a iit - - :.'[
.._ 7affl._'.
= 4 - -a ' ' "t
(Th .aba-, ' i
")
=___*7-,,l,a'._. r. ; - o - - o ' "'- ' a ' """'a ' a-l I -"a'l " - "
'!i{J'%;'v= :',,,' S -(p'J RQJ: Pj6e
I ':_""-r" a""r ( ""t-a-l"l'a a',<',,' , , '; - - - a + - } I - - " - 1-l y :"':i It la
"-'# adccr-m-
I L4 (l '
I a r' k - a""
- - - - - - - - -'ts- -
l
@scabe '.A'i=ii-oli
r - i- pTt#,+_, :J _i: %
4 = a'a, ' ;l=: 1, ,r a ;a= %a--!l.a'aa:' I.'a\ 4 's. a g4r-L"-a- {l
, -=""l-=),.s;'ci,e:s<)
L"'-F'ic.elZE&', 65!""L l;
!'i'fi.i,'l-!iiii,,__,_L,!T%,,.llll'jlli
6a 4AH -_ _:E,_@bcb'eqlAiia-,74@it
213
CC 05-03-2022
213 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.3l861 www.m-me.com
J(IFI
21143.P5 Cupertino City Hall
SHEET NC) nF
CALCULATEDRY BR nATF
CHECKED BY nATF

SCAI F
@
f'-&" ,, %N= .
...,.............,.h......................._...........................................>...-..... l sa
t-'-
,,,,,,,e'--#:""l:.'=:':+,,,a"""'1"var;j"
"! a au .-'
.@,,, -.ll..%;.,,..,a:0._,l_l. -. : ._. '
,: rr
"p' -=' (>-"h;
I
s
' ....f..... '%
. r J'
t'?ff,l -J-"-2f-.-'-"'dz';l.uzu -- -)"" i
ffilaJ =:i.ih!)a-!'=Ti!s
Mm-i(ptiuh L. .t2a,,'i",=sl
M ")-C" 4'-a"- - -
<:dAt%e.,cl, -"-" '-' >" '6%@ l'2Uo.c,
%- x.l a
X;_*:"*'-(_.I>' "";i "[z'g el'Zlle,c,(TV
i y *-k,- - ,/a Th]""'k l =L o <>Hz
I -i;,-:%.iL-[8,' :_-,t.;:8@,,,-, , kru,:,,5:4ml,S?heP3lCtG ,sl,lit hat o_ % yp(, l(, .f, ov- &mO
2pm.g L=t=-=+=.=g {}LI
c-il(4- cuqapu-:_ogsc er4q iHE-IT-

REVISED
a 3 x %
i
I
,",Th.

HED Architects Inc.

DAT-E: - -- -
yo oa.-t'ieG J-"J-7:Ex>'2j-
214
CC 05-03-2022
214 of 1033
MME
Civil & Structural Engineering
224 Walnut Ave, Suite B
Santa Cruz, CA 95060
831.426.3l861 www.m-me.com
211 43.P5 Cupertino City Hall
SHEET N(")
CALCULATED FIY nATF
CHECKED BY nATF
SCAIF
i) , It
215
CC 05-03-2022
215 of 1033
. LU_E
. %
8 " ",-
e 0
O-0
:,% ,,B
0 0
-O
0 0
MME Full Model
Cupertino City Hall
SK - 2
Bob Riley Nov 30, 2021 at 8:09 AM
21143.P5 Cupertino City Hall.rfl
216
CC 05-03-2022
216 of 1033
1pl1eH A)i3 oui4adn3
1IeH Aliz ou;)yedn3
gdaE:t71,IZ
IZOZ 'OS /ION Ae1iH qoB
g-xs 31/\H/\1
,.----...- :A:I :. ,l
' ax's ..'
I t =-.-a X.:),t , % --.,, , a -% --- %, s, am. ; ,.,, Xa, X, j". "i,
4,=:, - y:i-.,,"' )'Q ," a-'a - =%
,z x, 7 . . . - at' zl X
( 3 ' X' X' X" 47F';" >' :XX""' j'_ycJ I:'%'-' S 4'P'% a ' " " ', %-% " a ' a " ' "',-. "% a : : ' i ' a" 'o % . a " ,,, X, :i. ,., .../:' "%, %, S. ,- =%' "' "' a d % ,. .
..= i .x. " - " .'y -
% = / ]" J " . -' %% 'Q<y ,)
i' (] Xi a"s .i,ita ' aa
a""'' "" Xs...' 41..,7.%:41la' ill (, l.." zX<"""'XIX(,,"" == IXI. ,-., "%- l" ' ,! _,4'%"%_ )t' . € "%, %'-af=it7JE 'l,-"a'a-.." s, '% .. -' ', ( a,l,11,1,o s>,II,'l:,:)',:. ..: X'a""' ""'ts 'Q,.,a 'S@' ,l, x",i':3<,"!,,.1')"'a-" %% 4tgdfY', X"s ,.-' >,",'-,_<,,.% < , s z :l' !.. ' }i % ./' ,- ,." X%,y'X,s;' . =-....
b:. -wf" -j'% ,/ i "' % X, ,- o,
(,J"-8 .,""3 ' X" " % ,l: : : :",. : , , ! " " " ' % % , ,- /" " % X X %, '%, ,,: %/ , , ,' " ' a . =/ lh "% ,/' " " X X %. >'*:4y ) " ' Xaz ""'==,X s7'a"XX"'%,'% 8
' . z X X .X,'///<"'%a""'-,,XC7%,/z"'/zIil/:"Xa" X / % % / % 4"" o%% a ' / /' "" X -,,, /' , /' 4 %= %= ,, 1.1:%%; .':. . . ';!x,,' / <".. '-,: 'o'z/' X"s /' X%. ,' p< X-, X'%=,/ .i.
% Z X :;...s""'a ';"" % -' ffl /', ].....- / ." / "" . XX /""' %' 74 * "%- %. . -%, / /' %, ,r %. 1:) >Ja%/ / d ,s- %. i%:. .1'% .J ,- =' 4' , /' ;',,._, %.. ,,>a's' %/'
/" -/%-, % ,,! > aii /7' . / X'% ,7 ./"-'
I'-90jl?"!.,.,'a""f"a"=%7'l;' - X '-,, X "" *"'% , 'I ,,,d"X' z (i,l@,"X"' ' , g j @'-, , ,,% < s.," ,, , "%,,,>,, , / 's-,,,,'X%%, % % < , , , s . .st""' ./"
i%%=.'.i,) [1,>X,%ll<,xi7a"'--, ,-=""% "s,,,=rsa - 'a"'<.,'::,/./ ill:, .. ,l,,,,=-.,a " -5" l I/' i',>'e.),-=>-..,.;<'k. "'X ,/">"'% / _,-aa
ill ,a; ';, " i. '%,_ %,/" % .. ,,=-aa
" X E j "'a"s a /' ,,a 5" %1:*.1,<1,4.,'-y... 11' -== : '%'s%. % ' " "'% .42 .f t , % .i <" / ' I ',... %. , , . # / , '
/ . .'. l:. , .. 7
- .a % a'x(:: ,-"' % . , <2. : ', X, ',>. ,,,=" ({-.l.'Z"_a}':'*,...:i"""o"a"al'X !'/.,""'.t/["a" .///' "_%.l"-), , . ' YX , .,,,* %- / '. '. - '% '% /a= a/ , "- "(1 X", a..). ,,;-x>:ls 7; I :;;'h%,k;2 "%" .."'-"'-%% ' i'a"]"""""'""
'-......i!6x* " ! '- " .r/ : .
aJ4t' @ Q'.:)a .., ., a-s.l. ' ).' s ,,X' * ; . ' ,! . . i '%,- - -X 0 ') s . . - .*ttx i-,, ,,_ ? i
X Z:

T,Ill,,
A i:
217
CC 05-03-2022
217 of 1033
f%i)
A
CA)
J
Ol
I
o
o
O
;Cl
(D
<
:=
<
m
arJ_"f;'):J'C"':i'i'j,'<:,%,:ii'A%,% 115
g'
01 t!)la. tgJ[
; l
O l:
'=N ---+
*-
x
: ----- /7/]"' = "-""l_f7"">z "'X"
() it , ,( ri 77' / . _ {a % CAt'
,ffi '-.__X ',t' - "' / !%,yA a
I S. ! t s. / I '=,
/ / X. fl "-,
7 ,i , .:a i % y...(. I
a"'+'-y I ' s.."a" ':'-!J ,7,: /' _J ., tJa :<'- 5e ' ],Xs,. '::.JI7s'-fz2,,,,/s 1, =, s, %':,% % X..
.., / X . y %'Q'),,a 1,It
I "' til' ./' %- .. X' < ,.
[__,__,,, // X . t 7 '% X..._,/'t/ !, ,3 > , / '-" ! =...,_ - i / % / = i. %,/%, ,
< , X, , 's.
a /' }, " % / A'z
%/ ' ! '/ ) ! --
/'l/ / %"
V % /' "1 " ;
-.- '% / '%,,,.. / ]
-/ '!'-=
: : / ,, - /%. 't / " t
/ %, % / s 'I "'/'t
t=B7"a X / % % " * % .7 > %( P ; x. X. " . i.t. / % % / "' o<"-V a.a iXla'a' XX"XX /X>/X: . *' X'/!'>'/X/" "' %X'XLu'X'X.%- II,;"//l'a'l""1 a*sz,X.X." i X , ,,!/IXXXXXX'X,X, /,/ / X " ,-Q .
/ ' X % 7H 3!X "" X " ' - """ ' € X X'% , sX'. 4 '%cn LYB / z . ' ,-Q n %,._'.:..J'_:72- ,,,'s 3o/' % !.'X% 5'S @ 1%' 6::"t'l, X% ,[7 i ' !'%%/ '[
<.1 / '!%, , St/si. , ,
+ai,,,' I
. 3% ! ] % % / }./
/ '% " S i7 /, -
z. ,, _._.::X. "' "' " :m /<%/ % /%.
. az..', %:l-J- TJ'i' -# a 7A" X'X% ]%Xs< XXX' a ' ; J" :":"' y (71 4 7 a%a> '? > /: % li s'z ,-aa / " '=. !..!.% i_,.lli_ _ . ('%': e A,. /%,,<!,S,,'%'a " - , , a 7 0 , t a%,, , -,
"-"". '] ,t ga ,i. 0 :, /
s_ ,_ t 753: '
/ _! ! " 'S.. J. X
/t!! )
i ""%m . -" :;
t I -.4.. a"
] ,% ";
' -'-' -----=-7"' !. -a 'o 'Xa (3 a' / a , a':, . /- P, - .." -. 7a '= ] t .- , , =-
/. 'j...,,
/ $ . _.
1, .. . g
/ t =- = ' .:
_ a ' & .
-'-a-% "* - /- 'l'c1 S., a! i [
____,= t '> ,_,,
/ f ' s, ]
J j ia l
/ rnl:l
o
c
n
(D
1 :)
o
o
<"
I
m
I
0 c
n
a:i
:!
)
o
o
<
I
ai
A
z
o
<
CA)
0 N
0 N
(/)
x
(Jl
218
CC 05-03-2022
218 of 1033
Iz.,AX .
%, ,, .. =- ,r- .
% ;o'
..,-"a""'- %s28aJ>'1:<'a"; , / I . ,'
.i .a*i ,, ; /,@
.__;'X% lla""
,,-"a" z2""< '
/ ...@ "
. ' %.
r r z":'tj % - . /-.- _ .' Q- '
/', ,/ -"=
.., %:' iJ;t%,.. 's. -
. /" .-*' ii % %' /. ,i '%, 'iia . .:
},l<,:/. " X ' X' i:" q v .z""' %'<" . % "" %. / /" , ,' aza "s,.-" * % '.. .pia''"' y - '
: , ., / .i ::-.
t,,,,:-'J.' }i, _ /' z"' "" % _. >ll >, < s"", ,e" ".: .Z /" " ' X X1.J ......,, " %s. / ,@ _-:"" g'. a@'. ,X,* X y'-: /a X'. <=', l,%, 7, , ,,, y% jlJ: /. !( .X' % """"a'X,../X, / /%<a"- % '-, ,-niz,sag:ab,k, ).,- 4 ,7 / '%X,
'>1l;ll%o"zpzll"'.t,<@"'.>ll7/71:,,,7 ""s,>Xll%,-x"' @ *a 4<,;,a..X' sI,,yl,%,,.7""'aX%*,Fl:_k:'%7,ao ,l,=0%,I...] % = " %=c ,/' "%' ;" '%C' .-'
% 7
aa"7<s ,, .,z %, >< ,- -B458?!$3 . 'a:."4" i %,
/ 7 X". , %, ,, . , / = .. %" , /:
7, i , %%
%/a- %/ -f -4 %.'% ./'a=.. =f '-" I a '-
- => ' %r" " % A ' X > %/" ' € h , , ] " % 'i-= r. /;: : .y.,) amv.,'< iiaZ' - ,'.. : .'% a,,
i , % /
"-.,, a % /' [ %
% /'
-X,'a ")"'- i
i " ' "" a '% /" /
/="
, ... . , -E34.58!6-3 a
1% ,= : s . t= ---- I , %.. % ,-'
WTh:_,, S
aa - ' %
'i ' % Z ' -z4. . . j %, , ,@@$, .
?fflj!k a.%/' < -a' " X 'S
-'Jk_, %% / ,= > '- % ' %,/ % / %
'fi.zr=-,,< ' , ;k/' .. '%,---.>< ,/ %, ,'a
{ay..,.:l'2"a""'a"'y"";"""'a's %a""' s X "' X %" ""' 157-8g29X' " : X % X-' . iaat i ' % , "i
' l '
i ,,l
J"%X. X'. , ! s."' XI
'.ij;X,':a7%3.-%-,(XJs-,:_,_>,,, -a"o '2 € "''.'ft' . . .,.,, XX ' € fl' " "ora' C '%% , , tt ""-'taaal:'3:"'4"W. '-., .7',t" a"'X "'a""1 ' fflR?s '% %- / ' -. .. ' . ::: % a =-/ "" ' / a' ' " i . shy '% -= '
a my
%
" % / .=l , ,,
' i . %,
'; ' %.
l 'a' XXs k- o '11'-,,,,,=a' ... %, . a " - ...,, a '%%' "-,%_.l,,y '-.,. Xs az" m € '
- %
' / " " mBP" a'
. -' -,, V . y -.,,
( .a' 5:' a X %' " /- " sea"X" % f aE" :$::- a-, %4.,,. , s, , , .' : % '-.. .,=
-' a 5.,5 % . % - 'l smp I, 'X '%
a ,,- ' ,'%, %
,, oal(. X' % ze0'a'aaX
Loads: LC 40, 1E3C 'l B-7 (i)
?W -%. }- -"
'%, ,_=- =J, i F" 3
, X,, 7
EE i%=.-'
MME Cupertino City Hall SK-4
Bob Riley Nov 30, 2021
21143.P5 Cupertino City Hall.rfl
219
CC 05-03-2022
219 of 1033
Company : MME
Designer : Bob Riley
Job Number : 21143.P5
Model Name : Cupertino City Hall
Checked By : DH
Concrete Properties
Label E rksi1 G !ksil Nu Therm. Coeff. rl e5oF-'1 Density rk/ft31 fc rksil Lambda Flex Steel rksi1 Shear Steel rksi1 I Conc3000NW 3156 1372 0.15 0.6 0.145 3 I 60 60
2 Conc3500NW 3409 1482 0.15 0.6 0.145 3.5 I 60 60
3 Conc4000NW 3644 1584 0.15 0.6 0.145 4 I 60 60
4 Conc3000LW 2085 907 0.15 0.6 0.11 3 0.75 60 60
5 Conc3500LW 2252 979 0.15 0.6 - O.II 3.5 0.75 60 60
6 Conc4000LW 2408 1047 0.15 0.6 O.II 4 0.75 60 60
Wall Panel Data
Label A Node B Node C Node D Node Material Type Material SetThickness rin1 Desion Rule Panel/Soacina I WPI F1-N2 F1-N3 N47 N46 Concrete Conc3000NW 18 WALL 18" GUNNITE N/A 2 WP2 FI N4 FI N5 N49 N48 Concrete Conc3000NW 18 WALL 18" GUNNITE N/A 3 WP3 Fl,-N6 Fl-N7 N51 N50 Concrete Conc30QONW 18 WALL 18" GUNNITE N/A 4 WP4 F1,,,N8 Fl-N9 N53 N52 Concrete Conc3000NVl 18 WALL 18" GUNNITE N/A 5 WP5 FI NIO FI ,,NII N55 N54 Concrete Conc3000NW 18 WA[L 18" GUNNITE N/A 6 WP6 F1-N12 FI N13 N57 N56 Concrete Conc3000NW 18 WALL 18" GUNNITE N/A 7 - WP7 F1-N68 F1-N69 N59 N58 Concrete Conc3000NW 18 WALL I8" N/A 8 WP8 FI N70 FI N71 N61 N60 Concrete Conc3000NW 18 WALL I8" N/A g WP9 FI N72 FI N73 N63 N62 Concrete Conc3000NW 18 WALL I8" N/A 10 WPIO F1-N74 Fl-N75 N65 N64 Concrete Conc3000NW 18 WALL 18" N/A 1l WPII F1-N5 Fl-N22 N66 N49 Concrete Conc3000NW 18 a WALL I2" N/A 12 WP12 FI N22 F1 N23 N67 N66 Concrete Conc3000NW 18 WALL I2" N/A 13 WP13 FI N23 Fl N24 N68 N67 Concrete Conc3000NW '1 8 WALL I2" N/A 14 WP14 F1-N24 Fl-N25 N69 N68 Concrete Conc3000NW 18 WALL 12" N/A 15 -WP15 F1-N25 FI N26 N70 N69 Concrete Con53000NW 18 WALL I2" N/A 16 WP16 FI N26 F1 N27 N71 N70 Concrete Conc3000NW 18 WALL I2" N/A 17 WP17 FI N27 FI N2 N46 N71 Concrete Conc3000NW 18 WALL 12" N/A 18 WP25 Fl-N76 Fl-N77 N73 N72 Concrete Conc3000NW 18 WALL 18" N/A 19 WP26 Fl-N78 F1-'N79 N75 N74 Concrete Conc3000NW 18 WALL I8" a N/A 20 WP33 F2, N22 F2 N385 N76 FI N22 Concrete Conc3000NW 6 WALL 6" N/A 21 SW34 F2 N5 F2 N393 N77 FI N5 Concrete Conc3000NW 6 WALL 6" ' N/A 22 SW35 F2-N392 F2-N2 F1,-N2 N78 Concrete Conc3000NW 6 WALL 6" N/A 23 SW36 F2 N2 F2 N391 N79 F1 N2 Conciete Conc3000NW 6 WALL 6" N/A 24 SW37 F2 N389 F2 P265 N81 N80 Concrete Conc3000NW 6 WALL 6" N/A 25 SW38 F2 N386 F2-N27 F'l N27 N82 Concrete Conc3000NW 6 WALL 6" N/A 26 SW39 F2-,,P95 F2, -N396 N84 N83 Concrete Conc3000NW 6 WALL 6" N/A 27 SW40 F2-P110 F2-N394 N86 N85 Concrete Conc3000NW 6 WALL 6" N/A Floor Diaphragms
Elevation MaSS Mass Mal Of Mass X
I 13 757 .302 .993, %5
2 0 9.97e+6 3703, 60 %5
T Wind/Dnft
D2 N/A N/A N/A
D3 aa N/A N/A N/A
RISA-3D Version 19 [ Cupertino City Hall.rfi ] Page 1 220
CC 05-03-2022
220 of 1033
Company : MME
Designer : Bob Riley
Job Number : 21143.P5
Model Name : Cupertino City Hall
Checked By : DH

SEISMIC GENERATION INPUT
Seismic Code: ASCE7-16
Base Elevation: 0 ff
Risk Category: fflV Seismic Weight LC: LC 1: Deflection I S 1: 0.41 g
C - (102TXa
C - 0.75TXExpa
T a Not Entered secXa
S s: 0.69 g S : 0.313 g T : 12 sec
1 L
C,: 0.02 TZ: NotEntered sec
TZExpa Za

SEISMIC GENERATION DETAIL RESULTS
ImportanceFactor: L.S DesignCategory: D
Period Determination:

X - Direction
T a O.1369 saXa
T a O.1917 sX,LIMlTa
Base Shear Determination
C a O.207 sS)C
Z - Direction
T a O.1369 saZa
T a O.1917 sZ,llMlTa
C o O.207 sSZa
ASCE Eqn 72.8-2Vz: 375.5311 kipsASCE Eqn 72.8.-2V X: 375.5311 kips

SEISMIC GENERATION FORCE RESULTS
Floor Level
Floor Plan 2
Base
Height
(ft)
13 Weight Force X Force Z CG X
(kips) (kips) (kips) (ft)
1757.7961 375.5311 375.5311 47.993

56.3639
CG Z
(ft)

60.0291
Total: 375.5311375.53111814.16

SEISMIC GENERATION DIAPHRAGM RESULTS
Floor Level
Floor Plan 2
Widtti (X)
(ft)
112
Length (Z) X Plus X Minus Z Plus Z Minus
(ft) (ft) (ft) (ft) (ft)
$36 5.6 5.6 6J 6J
RISA-3D Version 19 [Cupertino City Hall.rfl ] Page 2 221
CC 05-03-2022
221 of 1033
Company
Designer
Job Number
Model Name
MME
Bob Riley
21143.P5
Cupertino City Hall
Concrete Wa// Seismic Design Ru/e
Label WallT
ACE 318-14 Wa// Panel Concrete Code Checks (In-Plane} Wall Panel Region Max UC Shear UC
-1 WPI Rl "!.3802 37 0.2608 25 -47.2317 594.8201 224.4069 2 WP2 RI t.2432 49 0.2658 19 -44.8B7 598.0166 213.5245
-3 WP3 R'l 0.1081 5 0.0349 49 1596.9862 NC 210.0918
4 WP4 RI 0.1086 5 0.0368 13 1596.9862 NC 219.861
5 WP5 Ral- 0.1061 5 '0:0415 37 1788.885' NC 236.5489
6 WP6 RI 0.1061 5 0.0417 37 1788.885 NC 236.5484
7 WP7 RI 0.0525 13 0.0122 37 887.5349 368.7764 130.6125 8 WP8 RI 0.0525 13 0.0122 37 887.5349 368.7764 130.6125 9 WP9 RI 0.0525 13 0.0122 37 887.5349 368.7764 130.'6125 10 WPIO RI 0.0525 13 0.0122 37 887.5349 368.7765 130.6125 -I I WP11 RI _ 0.0445 46 0.0752 13 NC,' 102891 J3391 3521.1448 12 WP12 RI 0.0791 37 0.1739 37 NC 25205.6233 1760.2056
13 WP13 RI 0.1609 a5 0.0874 28 NC 2897.3351 550.1789
14 WP14 RI 0.0055 31 0.0009 13 NC 27368.5913 1760.5724
15 WP15 -Rl ' a O.1028 a 55 0.0434 ' 10 -NC :zzs'i ;gssz 550.1789 16 WP16 RI 0.2077 19 0.1399 25 NC 6059.8437 880.2862
17 WP17 RI a.'0359' 19 0.0694 -31 28762.9372 _ 48373J78-48 3521 .'l 449 18 WP25 RI 0.068 37 0.0278 13 NC 321.3424 107.328
tg WP26 Eel - 0.0679 49 0.0274 25 - NC "-312.3962 105.4024 20 WP33 RI 4.1699 37 0.8427 37 NC 299.8617 ffl.4281
21 SW34 R.3 4.1618 . 43 0.8411 43 NC - 300.4652 111.6398 22 SW35 RI 3.6942 37 0.9763 43 -16.8404 242.6171 93.8212 23 SW36 ,R-I 3.238! 34 0.8645 40 -13.8886 _. 255.4613 95.37 24 SW37 RI '1.3477 40 0.5481 40 25.4337 1084,5816 198.3539 25 SW38 Rl 4.=!277 55 0.8416 55 NC 302.9365 m.5769
26 SW39 R1 2.7359 40 0.5487 40 10.3615 374.3138 137.175 27 SW40 Rl 3.1426 40 0.7076 40 9.4561 ' a 460.4482 152.1494 ACI 318-14 Wa// Panel Concrete Code Checks (Out-of-Plane) Wall Panel Reoion Max UC Shear UC
Checked By : DH
Diagonal Bar Size
Pn*phi(k1 Mn*phi(k-ftl Vn*phirk1
Pn*phirk/ftl Mn*phirk-fUff1 Vn*phirk/ft1
1 WP1 RI 0.6346 (Int) 43 0.0211 25 -22.4531 NC - 16.7062 2 WP2 RI 0.4216 (Int) 49 0.0197 13 -22.4552 NC 16.7748 3 WP3 RI 0.1081 (Int) 5 0.0008 34 299.6222 28.4641 15.4653 4 WP4 R1 0.1086 (Int) 5 0.0008 40 299.6222 28.4641 15.4687 5 WP5 R1 0.1061 (Int) 5 0.0007 52 298.f475 28.324 15.4672 6 WP6 RI 0.1061 (Int) 5 0.0007 34 298.1475 28.324 15.4671 7 WP7 Rl -0.0491 (Int) 4 0.0008 16 330.a4091 31.3889 15.8335 8 WP8 RI 0.0491 (Int) 4 0-0007 16 330.4091 31.3889 15.8335 9 WP9 RI 0,0491 (Int) 4 0.0006 10 - 330.4091 31.3889 15.8335 10 WPIO RI 0.0491 (Int) 4 0.0007 10 330.4091 31.3889 15.8335 11 WPI1 Rl 0.0573 (Int) _ 25 0-0086 37 NC 17.0313 8.8928 12 WP12 R1 0.0505 (Int) 19 0.0068 13 NC 17.0347 8.9899 13 WP13 R1 0.0616 (Int) 19 0.0225 25 NC 17.0313 8.9906 14 WP14 Rl 0.0218 (Jnt) 28 0-0057 28 NC 17.0313 8.9532 15 WP15 R1 0.0456 (Int) 25 0.0222 13 NC 17.0313 8.9236 16 WP16 RI 0.0458 (Int) 31 0.0108 19 NC 17.0313 8.8506 't7 WP17 RI 0.0539 (Int) 28- 0.0063 31 NC 17.0313 8.9463- 18 WP25 R1 0.0334 (Int) 4 0.0008 31 330-4091 31.3889 15.656 RISA-3D Version 19 [Cupertino City Hall.rfl ] Page 3 222
CC 05-03-2022
222 of 1033
Company
Designer
Job Number
Model Name
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
ACI 318-14 Wall Panel Concrete Code Checks (Out-of-Plane) (Continued) Wal) Panel Reqion Max UC Shear UC Pn*ohirk/ft1 Mn*ohiJk-ft/ft1 Vn*ohirk/ft1 19 WP26 RI 0.0334 (Int) 4 0.0009 13 330.4091- 31.3889 15.656 20 WP33 R1 0.0757 (Int) 6 o 25 NC 2.6372 3.0022
21 SW34 RI 0.0758 (Int) 6 0 19 NC 2.6325 3.0021
22 SW35 RI 1.46'!1 (ant) 52 0.1207 46 -9.9091 0.3472 2.4503 23 SW36 Rl 'J.63% (Wa"at) " 55 0.1819 55 -9.5688 0.4306 . 1.6752 24 SW37 Rl 0.0644 (Int) 55 0.0001 13 NC 2.5958 3.0245
25 SW38 aRl 0.0758 (Int) 6 -O 19 ,, NC 2.e339 3.0021
26 SW39 RI 0.0751 (Int) 7 0.0004 10 91 .0654 5.9'l93 3.0454 27 SW40 RI 0.0705 (Int) 7 0.0004 10 91 .0654 5.9193 3.039 Warning Log
Message
I Wall Panel WP1 is failing, a reinforcement requirement. See detail report..for mare information. 2 Wall Panel WP2 is failing a reinforcement requirement. See detail report for more information. 3 -Wall.Panel WPI 1 is failing a reinforcement requirement. See aetail roe iport f6r'm6re information. 4 Wall Panel WP12 is failing a reinforcement requirement- See detail report for more information. 5 ' WallPffinelWM3isfailingareinforcementrequiremem.Seedetailreportfo-rmoreinformation. 6 Wall Panel WP14 is failing a reinforcement requirement. See detail report for more information. 7 " Wall.Panel WP15 is failirig ffi reinforcement requirement. See 'detail report far rn6re information. 8 Wal) Panel WP16 is failing a reinforcement requirement. See detail report for more information. 9 a Wall Panel WP17 is failing'a reinforcement requirement. See detail 'report for'm6re information.

RISA-3D Version 19 [Cupertino City Hall.rfl ] Page 4 223
CC 05-03-2022
223 of 1033
Company
Designer
Job Number
Model Name
Detail Report WP33
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
:?%'j;?2 "(#x(:rJ(+'-.+-"'a#0.'0#a:a0l JJ==-a-=.'='.a.-:
:- . .. -. }
"' JI,. __, . ' _ , , . . .. )8
I ;- - " }
y ' - ., - "' .. }
% _. l,; . :., .' l _ .. ,+
t. .. ...;,}, ;+" 0 ... y
]
; , , ." . :.' a ' "l .":" ' ,, . . . : '
, , :-' . , # l .,l ,, .. {
" ., .:-:, "- :R!' ": '=.. .." ,:.
, "":-- .: 06 = !
'F
I" 41 ' ""' l:" ::" :::" ' " ":" :';
to.. aa
, "l :R!' ":'
y-. - .. ..=i
a: " a W
i-"-".!
l'- .:-.:
'W!
I :i " i ;;">''H :-,,""""" a " " ' . . ' - .' " ' tll,::laa""'ffil,,l,l"aa""""':;':':'="l"3X!7'5<l+sl"' :,::'-,,l(....<':""Jl,%'::":':':.i.,l." 'a' ! -, - _, - .l,!
.F'tQh22
Material Properties:

Material Set:

Concrete fc (ksi):

Concrete E (k5i):

Concrete G (ksi):

Conc3000NW
3 3156
1372
Conc Density (k/ft3): 0.145
Lambda: 1
Conc Str B)k: Rectangular
: Geometry:
' Total Height (ft):
' Total Length (ft):

Thickness (jH):

K:
13 7.49
6 1
Int Cover (-z, ill):

Ext Cover (+z, i4):

Cover Open/Edge (in):
1 I
2 Input Data:
(.ode:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Horz Bar Size:

Transfer In?:

Transfer Out?:

Group Wall?:

ACI 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (ksi):

Horz Bar Fy (ksi):

Steel E (ksi):
60 60
29000
Use Cracked ?:

In Icr Factor:

Out Icr Factor:

Yes

0.7 0.35
Design Summary: Enveloped Results
.Delta.Max In-Plane
' UC Max Out-of-Plane
UC Shear Out-of-Plane
Delta Max Out-of-Plane
; Region Design
Region RI (In-plane),
Regi-an Rl.'[6ut-ojl-Planej .-"
Result
RISA-3D Version 19 [ Cupertino City Hall.rfl ] Page 5 224
CC 05-03-2022
224 of 1033
Company
Designer
Job Number
Model Name
Detail Report SW34
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
F';t'Jj33m=;r=-'-='-=---='-=--"1
J !,
i. ==)m' a ""
l.,a':...a"" " ' o - .1"" % "
i,:: .:'.' )' .,,...,
. : a a" . .. ,,
: ': _.4z:', '
i""-"-""- '' i
C"_ _. !1. .y.': ii }
.." .. : .. =' I
y . ,:. ,it,
t, :,:" Iffi: ... l', 'i
, ii ...., li i
i, I
- -i
"n' :';,4,''kaazj'
. = ,.,. , . = "-'i
" ""l - I
.. - .. 'u" " " - i- ':. - ". .. - I
:,f,_. .. ,, a., ,.. 0 i
" a ' - " " " ) ': ' a " I.. " " :' &-" :'- "( .. - t4-' -:(;.jr" {

7..:" :. _ :. "' _ ..)r: 7 ';.@ ai, i';;. .:'.. . ; .'.(' ;j ' -.. ... . -l ,,, ): = i,, .' ". ;ia .,, ,' ,,, :.., ", t_ ::,. I il. , .. 111.. _. . .. a ... .. _ I ,ji> :,:,, .,.. _ - ,. ia. ,. ... .il:'. - aa _ _ ,, ,3a. ), j " iia- ===- 'a-" = :::" 'aa o" - -' ... ......'.'La F-?J! €6
Material Properties:

Material Set:

Concrete f'c (ksi):

Concrete E (ksi):

Concrete G (ksi):

Conc3000NW
3 3156
1372
Geometry:

Total Height (ft):
' Total Length (ft):

Thickness (in):

K:
13 7.5042
6 1
Conc Density (k/fta): 0.145
Lambda: I
Conc Str Blk: Rectangular
Int Cover (-z, i4):

Ext Cover (+z, jl-)):

Cover Open/Edge (in):

I
I
2 , Input Data:

Code:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Horz Bar Size:
' Transfer In?:

Transfer Out?:

Group Wall?:

ACI 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (1(5j):

Horz Bar Fy (k5j):

Steel E (ksi):
60 60
29000
Use Cracked ?:
ln Icr Factor:

Out Icr Factor:

Yes

0.7 0.35
Design Summary: Enveloped Results
RISA-3D Version 19 [ Cupertino City Hall.rfl ] Page 6 225
CC 05-03-2022
225 of 1033
Company
Designer
Job Number
Model Name
Detail Report: SW35
MME
Bob Riley
2il43.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
"'--" "'-!
ffi-' a-T-'m
;,;,2_ _ ' !
v. ::- i'i _ _ ;l
I' - .:=;a . 1. ;l
l: " ..,.....
i' . t- . (:J,...@4'..
' "= - % ' , ,: ' ,,
7-'.})
' . " }
i, , .,; " -:, , , ' ..,!
l ." ".; a"_=:
' -' .i
7q@J9gl=.J
- 67 - -
i:--.... ._ ,,:..,, ,,!, .. .... ..
lo_' _._.:.'_.____i:;.';. ..Xf'i'.i:;;i S=t..'..mismm*-m.............t....t....................'.'..___J PtjN2
. Material Properties:

Material Set Conc3000NW
Concrete fc (1(5i): 3
Concrete E (ksi): 3156
Concrete G (ksi): l372
Conc Density (k/ft3): 0.145
Lambda: 1
Conc Str Blk: Rectangular
i Geometry:

Total Height (ft):

Total Length (ft):

Thickness (jH):

K:
13 7.5
6 1
Int Cover (-z, j4):

Ext Cover (+z, in):

Cover Open/Edge (in):
1 1
2 ', Input Data:

Code:

Design Rule:

Seismic Rule:

Loc of r/f.

Outer Bars:

Vert Bar Size:

Horz Bar Size:

Transfer In?:

Transfer Out?:
, Group Wall?:

ACI 318-14
WALI 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (ksi):

Horz Bar Fy (1(5j):

Steel E (ksi):
60 60
29000
Use Cracked ?;
In Icr Factor:

Out Icr Factor:

Yes

0.7 0.35
Design Summary: Enveloped Results
UC Shear In-Plane-
:' Delta Max In-Plane
' Region Design Result
RISA-3D Version 19 [Cupertino City Hall.rfl I Page 7 226
CC 05-03-2022
226 of 1033
Company : MME
Designer : Bob Riley
Job Number : 21143.P5
Model Name : Cupertino City Hall
Detail Report: SW36
Checked By : DH
Enveloped Results
: Input Data:
-'--'- '---------- a -""="""J
i.
-,." -a""""a"-"-'-"
t - ..,-.
- T. "' ._l
.- -i .1.. - _)' .. I
.... '>if,
. ..,, - 7.. . 7 _ E .. 'a li ii
( ::(. "..:.t:- '::p.::::I.':..::. =.. a ,,,:' .,.,)i r , .. - . ji aa. ,,.Q/=. ,.} - o% -
I .. . " '-. " " a
I =4.-'. -"'
I
i ,, , : " '_ 7 " ' " " - - . . - "
' ""- "'-- -=J.= -..,&': , 'i
Tm
'::,:.:....,,,. =...,,]
J"
: a ' . -I
3:.r:.@g,.'B J
_- I
_s a i
__
l=-
: Material Properties:

Material Set Conc3000NW
Concrete fc (1(5j): 3
Concrete E (k5i): 3156
Concrete G (55i): 1372
Conc Density (k/ft3): 0.145
Lambda: 1
Conc Str Blk: Rectangular
: Geometry:
, Total Height (ft):
: Total Length (ft):

Thickness (in):

K:
13 7.5
6 1
Int Cover (-z, in): 1
Ext Cover (+z, in): 1
Cover Open/Edge (in): 2
Code:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Horz Bar Size:

Transfer In?:

Transfer Out?:

Group Wall?:

ACI 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (ksi):

Horz Bar Fy (ksi):

Steel E (35j):
60 60
29000
Use Cracked ?:

In Icr Factor:

Out Icr Factor:

Yes

0.7 0.35
Design Summary: Enveloped Results
UC Max In-Plane
UC Shear Out-of-Plane
Region Design
Region R1 (Out-of-Plane)
Result
RISA-3D Version 19 [Cupertino City Hall.rfl ] Page 8 227
CC 05-03-2022
227 of 1033
Company
Designer
Job Number
Model Name
Detail Report. Sl/V37
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
' Material Properties:

Material Set: Conc3000NW
Concrete fc (ksi): 3
Concrete E (ksi): 3156
, Concrete G (ksi): 1372
Conc Density (k/fta):

Lambda:

Conc Str Blk:

0.145
Rectangular
', Geometry:

Total Height (ft):

Total Length (ft):

Thickness (in):

13.333
Int Cover (-z, in):

Ext Cover (+z, j4):

Cover Open/Edge (j4): 2
' Input Data:

Code:
; Design Rule:
oSeismic Rule:

Loc of r/f:
; Outer Bars:
' Vert Bar Size:

Horz Bar Size:

Transfer In?:

Transfer Out?:

Group Walk?:

AC! 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (ksi):

Horz Bar Fy (k,5i):

Steel E (ksi): 29000
Use Cracked ?:

In Icr Factor:

Out Icr Factor:

Yes
Design Summary: Enveloped Results
UC Max In-Plane
' UC Shear In-Plane '
' Delta M:ax In-Plane
' UC Max Out-of-Plane
UC Shear Out-of-Plane
Delta Max Out-of-Plane
Wall Reinforcement a.

Region Design
Region Rl (In-Plarie)- -'-
Regior; R1 (Out-'of-Plane)
RISA-3D Version 19 [ Cupertino City Hall.rfl ] Page 9 228
CC 05-03-2022
228 of 1033
Company
Designer
Job Number
Model Name
Detail Report S!/V38
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
i Material Properties:

Materia) Set:

Concrete fc (k5i):

Concrete E (ksi):

Concrete G (k5i):

Conc3000NW
3156
1372
, Geometry:

Total Height (fl):

Total Length (fl:):
"tN2Z
Conc Density (k/ft3):

Lambda:

Conc Str Blk:

0.145
Rectangular
Int Cover (-z, in):

Ext Cover (+z, j7):

Input Data:

Code:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Hoiz Bar Size:

Transfer In?:

Transfer Out?:

Group Wall?:

ACI 318-14
WALL 6"
SDR Concl
Ceritered
Vertical
Yes
Yes
Yes
Vert Bar Fy (1(5j):

Horz Bar Fy (ksi):

Steel E (1(5i): 29000
Use Cracked ?:

In Icr Factor:

Yes
Thickness (in): Cover Open/Edge (in): 2 Out Icr Factor:

Design Summary: Enveloped Results
' UC Max In-Plane
Delta Max In-Plane
UC Max Out-of-Plane
UC Shear Out-of-Plane
Delta Max Out-of-Plane
: Wall Reinforcement
, Region Design
RISA-3D Version 19 [ Cupertino City Hall.rfl ] Page 10 229
CC 05-03-2022
229 of 1033
Company
Designer
Job Number
Model Name
MME
Bob Riley
21143.P5
Cupertino City Hall
Detail Report: SW39
Checked By : DH
Enveloped Results
Material Properties:

Material Set: Conc3000NW
Concrete fc (ksi):

Concrete E (ksi): 3156
Concrete G (ksi): 1372
, Geometry:

Total Height (ft):
' Total Length (ft):

Thickness (in):

K:

Conc Density (k/ft3):

Lambda:

Conc Str Blk:

0.145
Rectangular
Int Cover (-z, jH):

Ext Cover (+z, j4):

Cover Open/Edge (in): 2
Input Data:

Code:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Hor2 Bar Size:

Transfer In?:

Transfer Out?:

Group Wall?:

ACI 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (ksi):

Horz Bar Fy (ksi):

Steel E (5i): 29000
Use Cracked ?:

In Icr Factor:

Out Icr Factor:

Yes
Design Summary: Enveloped Results
Region Design Result
RISA-3D Version 19 [Cupertino City Hall.rfl ] Page 11 230
CC 05-03-2022
230 of 1033
MME
Company
Designer
Job Number
Model Name
Detail Report SW40
MME
Bob Riley
21143.P5
Cupertino City Hall
Checked By : DH
Enveloped Results
Material Properties:

Material Set: Conc3000NW
Concrete fc (ksi):

Concrete E (ksi):

Concrete G (ksi):
3156
1372
Conc Density (k/ft3):

Lambda:

Conc Str Blk:

0.145
Rectangular
: Geometry:

Total Height (ft):

Total Length (ft):

Thickness (in):

Int Cover (-z, ill): 1
Ext Cover (+z, jll): I
Cover Open/Edge (in): 2
Input Data:

Code:

Design Rule:

Seismic Rule:

Loc of r/f:

Outer Bars:

Vert Bar Size:

Horz Bar Size:

Transfer In?:
. Transfer Out?:
. Group Wall?:

ACI 318-14
WALL 6"
None
Centered
Vertical
Yes
Yes
Yes
Vert Bar Fy (25j):

Horz Bar Fy (ksi):

Stee! E (ksi): 29000
Use Cracked ?:

In Icr Factor:

Out Icr Factor:

Yes
Design Summary: Enveloped Results
UC Shear In-Plane
,Delta Max In-Plane
UC Max Out-o.f-Plane
, UC'Shear Out-of-Plane
Delta Max Out-of-Plane
: Region Design Result
RISA-3D Version 19 [ Cupertino City Hall.rfl ] Page 12 231
CC 05-03-2022
231 of 1033
TIPPING •4tJ;j STRUCTURAL ENGINEERING
Cupertino City Hall Alternates Study
Structural Evaluation:
10300 Torre Avenue, Cupertino, CA 95014-3202
Prepared By:

Tipping Mar
1906 Shattuck Avenue
Berkeley, CA 94704
510.549.1906 tel I 510.549.1912 fax
TM Job No. 2014,094.00
September 29, 2014
1906 SHATTUCK AVENUE, BERKELEY, CA 94704 510 549-1906
Prepared For:

Perkins+ Will
2 Bryant Street, #300
San Francisco, CA 94105
c/o City of Cupertino
City of Cupertino
CIP Project# ZO f ::> .:. O 1
File# C:;( OC/-),�� www.tippingmar.com
Section # _,Z , / .O - -- --
Attachment G2
232
CC 05-03-2022
232 of 1033
233
CC 05-03-2022
233 of 1033
234
CC 05-03-2022
234 of 1033
235
CC 05-03-2022
235 of 1033
236
CC 05-03-2022
236 of 1033
237
CC 05-03-2022
237 of 1033
238
CC 05-03-2022
238 of 1033
239
CC 05-03-2022
239 of 1033
240
CC 05-03-2022
240 of 1033
241
CC 05-03-2022
241 of 1033
242
CC 05-03-2022
242 of 1033
243
CC 05-03-2022
243 of 1033
244
CC 05-03-2022
244 of 1033
245
CC 05-03-2022
245 of 1033
246
CC 05-03-2022
246 of 1033
247
CC 05-03-2022
247 of 1033
Cupertino City Hall
Essential Services Facility Analysis
Final Report, Revision 1
March 27, 2012
Attachment G3
248
CC 05-03-2022
248 of 1033
Table of Contents

1.0 Project Participants

2.0 Executive Summary

3.0 Structural Analysis

3.1. Scope

3.2. Applicable Codes

3.3. Deficiencies Identified

3.4. General Recommendations

3.5. Specific Recommendations

3.6. Recommendations

Figure 3A Key Structural Building Plan
Figure 3B Key Roof Plan
Figure 3C-G Connect ions Details

4.0 Architectural Analysis

4.1. Scope

4.2. Applicable Codes

4.3. Fire and Life Safety Key Issues

4.4. Other Issues

4.5. Recommendations

Exhibit 4A: Code Analysis Work Sheet
Exhibit 4B: Accessibility for Existing Building
Exhibit 4C: Occupancy Load and Exit Diagram First Floor Exhibit 4D: Occupancy Load and Exit Diagram Basement Floor

5.0 Mechanical, Electrical, Plumbing, Fire Protection Analysis

5.1. Scope

5.2. Applicable Codes and Standards

5.3. Mechanical

5.4. Plumbing

5.5. Fire Protection

5.6. Electrical

Appendix:

Kick-off Meeting Minutes (2/14/2012)
Clarification of Alternatives (2/21/2012 E-mail message)

249
CC 05-03-2022
249 of 1033

1.0 Project Participants

Client:

City of Cupertino
10300 Torre Avenue
Cupertino CA 95014

Carmen Lynaugh Public Works Project Manager
Terry Greene Acti ng City Architect
Larry Squarcia Senior Building Inspector
Albert Salvador Building Official
Arnold Hom Plan Check Engineer
Timm Borden Director of Public Works
Chris Orr Facilities Supervisor
Rick Kitson Public and Environmental Affairs Director

Architect:

Perkins + Will
185 Berry Street, Suite 5100
San Francisco, CA 94107
Phone: 415.856.3000

Karen Alschuler Project Principal
Susan Seastone Project Manager
Haji Ishikawa Project Architect

Structural Engineer:

AKH Structural Engineers Inc.
1505 Meridian Avenue, Suite B
San Jose, CA 95125
Phone: 408.978.1970

Tim Hyde President

Mechanical, Electrical, Plumbing, Fire Protection Engineers:

PAE Consulting Engineers, Inc.
425 California St., Ste. 1200
San Francisco, CA 94104
Phone: 415.544.7500

Mike Lucas Project Principal
Marco Alves Mechanical Project Engineer
Hooshang Pakzadan Electrical Project Engineer

1 250
CC 05-03-2022
250 of 1033

2.0 Executive Summary

This scope of this project is an analysis of the Cupertino City Hall building and its compliance with current codes related to Es sential Services Facility requirements. The objective of this study is to identify both deficiencies and potential improvements to the building necessary to achieve essential facility status by current codes.

Four alternative approaches were identified by the City of Cupertino representatives and the design team for the renovation of the exis ting City Hall facility. These approaches, described below, differ in their scope and anti cipated construction cost. More detail for each item can be found in the body of the report.

Alt #1 No Upgrade: This alternate proposes no modifi cations to the existing City Hall building and a relocation of the existing Em ergency Operations Center (EOC) to another facility.

Alt #2 Minimum Seismic Upgrade: This alternate proposes modifications to the building structure only to bring the facility to a code compliant Essential Services Facility status.

No proposed plan changes are proposed in th is alternate in order to maintain the ability to “grandfather in” the existing EOC in its current configuration. Only structural items triggered by I-factor improvements and maintenance are intended to be modified.

Accessibility upgrade improvements may be triggered in this alternate.

Alt #3 Moderate Upgrade: This alternate proposes that all Alternate #2 items as well as additional plan modifications to address life safety code updates be implemented.

Accessibility upgrade improvements would be triggered in this alternate.

Alt #4 Replacement – This alternate proposes a new City Hall building that aligns with ideas being proposed in the Civic Center Master Plan Study currently in process by Perkins + Will. This new facility would meet all current codes, incorporate sustainable features, and include Essential Services F acility requirements while at the same time address the specific needs and desires of the building occupants.

Following the completion of this report, the Ci ty of Cupertino and th e design team will meet with a cost estimator designated by the city to identify order of magnitude costs for each alternative. After this process has been completed and an alternative is selected, the city may authorize the design team to pr oceed with the design and documentation of the selected alternative.
2 251
CC 05-03-2022
251 of 1033

3.0 Structural Analysis (by AKH)

3.1 Scope
The scope of this section includes recommendations for mitigating structural deficiencies discovered in our assessment report dated November 11, 2011. The report has indicated that the heavy roof tile is a major factor in the deficiencies of the structure. The following recommendations are based on the a ssumption that the heavy tile roofing will be replaced by a lighter roofing material, and possibly with solar panels over some of the sloped roof areas.

3.2 Applicable Codes
The structure was recently as sessed using seismic forces required in the 1985 Uniform Building Code (UBC), as this was the Code to which the 1986 alterations were designed.

Recommendations within this report are base d on seismic forces as dictated by the current 2010 California Building Code (CBC).

3.3 Deficiencies Identified
 Roof Diaphragm Shear Capacity
 Roof Diaphragm Collector Splice Capacity
 Anchor Bolt Connections at top of Shear Walls
 Upper Concrete Shear Wall Flexural Capacity
 Upper Concrete Shear Wall Boundary Members
 Upper Concrete Shear Wall Second Layer of Reinforcing  Concrete Column Reinforcement for Confinement
 Equipment Anchorage Capacities Unknown

3.4 General Recommendations

This structure consists of concrete shear walls with heavy clay roof tiles on the sloped roof areas and heavy gravel ballast in the central area bounded by the upper mansard/screen wall. The roof tiles represen t a significant portion of the building’s mass at the upper level. The design seismic forces on a structure are based directly on a fraction or percentage of the total mass (wei ght) of the building. Thus, the roof tiles represent a significant amount of the seismi c forces that the building’s lateral force- resisting systems must resist. Our recommendations, therefore, include the replacement of the heavy tile roofing with a lighter material. This would also allow for the opportunity to install photovoltaic (PV) solar panels on the roof surface. As the weight of typical PV panels is small relative to the weight of the existing clay roof tiles, future improvements could include the addition of these PV panels while still reducing the building’s mass and resulting seismic design forces.

Also, the upper story of this structure relies on two relatively narrow concrete shear walls on each of the four sides of the building. These shear walls comprise the building’s entire lateral force resistance at the upper level, as the structure does not have any interior walls or structural frames that resist lateral forces. While the shear walls occur on each of the building’s four sides, the walls are relatively narrow compared to their height, resulting in high in-plane shear stresses when resisting the seismic design forces, as well as relatively high tension and compression forces at the ends of the walls. Finally, the use of only two primary force-resisting elemen ts on each side of the structure provides 3 252
CC 05-03-2022
252 of 1033

only minimal redundancy. Overall, the smaller number and length of walls result in a structural configuration that has historically performed less than optimally in resisting lateral, seismic forces in moderate and major earthquakes. Therefore we recommend that additional shear walls be added on each side of the structure. The included key plan of the building indicates where concrete wall s can be added to the building, utilizing portions of existing solid exterior wall. These proposed locations would affect the building’s current aesthetics and function to only a limited degree, if at all. See Fig. 3.A.

In general, if the clay roof tiles are replaced with lighter roofing materials (even including PV panels), the building’s seismic mass would be reduced substantially, and the magnitude of most of the structure’s noted deficiencies are reduced to levels that are more readily addressed.

3.5 Specific Recommendations

In addition to the general recommendations above, following are our specific recommendations for each of the deficiencies noted in the Section 3.3 above:

3.5.1 Roof Diaphragm Shear Capacity

The existing roof diaphragm is co mprised of plywood sheathing with specific nailing along its panel edges to common framing members. Its shear capacity is affected by the type and thickness of plywood used, and the size and spacing of nailing used. The existing roof diaphragm shear capacity is exceeded even if the existing roof tile were to be removed and replaced with a lighter roofing material . The roof diaphragm forces would be reduced significantly with the replacement of the heavy clay roof tiles, although the calculated diaphragm shears would still exceed the diaphragm near the building’s perime ter, which is where the diaphragm shear forces are highest. The plywood diaphragm can be strengthened as needed with added panel edge nailing ne ar the perimeter of the building.

This added nailing would be installed while the roofing is being replaced.

See Figures 3.B and 3.G.

3.5.2 Roof Diaphragm Collector Splice Capacity

The existing roof diaphr agm collectors consist of steel roof beams around the perimeter of the structure, and are aligned parallel to and above the upper-level concrete shear walls. The se elements colle ct the seismic forces within the roof diaphragm and de liver the forces to the shear walls.

Where splices occur in the lines of steel beams at approximately ten (10) locations, the connectors are currently not adequate to transfer the required seismic collector forces. Our recommendation to address this deficiency would be to provide welding around the splice plates to the beams at the splice connections. See Fig. 3.F.

3.5.3 Anchor Bolt Connections at top of Shear Walls

4 253
CC 05-03-2022
253 of 1033

The collector beams mentioned in the previous section are connected to the top of the concrete shear walls with anchor bolts embedded in the walls and extending through the steel beam flange. This is the means through which the seismic forces are transferred from the roof to the shear walls. The current anchor bolts are insufficient to transfer the prescribed forces to the shear walls, even with added shear walls. Our recommendation is to provide adequate anchor bolts to any new walls and provide additional anchor bolts through the existing beams, between the existing anchor bolts, to strengthen the shear-transfer connections sufficiently. See Fig. 3.F.

3.5.4 Concrete Shear Wall In-Plane Flexural Capacity

In-plane flexure results from the shear walls bending when resisting seismic loads at their tops, tending to rotate and bend the wall over, causing tension and compression at wall ends. With the addition of upper-level new shear walls as reco mmended above, this flexural deficiency likely would no longer exist in the existing walls, as the forces resisted by the existing walls would be reduced, as well as the induced flexural forces. The added shear walls would be designed to have sufficient reinforcing to resist bending in the plane of the wall.

3.5.5 Concrete Shear Wall Boundary Members

Boundary members are required where the in-plane flexural forces generate high compressive forces at the wall ends. These compressive forces, when at a certain level, must be resisted by stronger column-type elements, containing internal confinement of the vertical wall reinforcing near the wall ends. The existing walls would require added boundary confinement to resist current Code-level forces. With the removal of the heavy roof tile and gravel, and dependi ng on the lengths and locations of added shear walls as noted above, the compressive flexural forces would be reduced to a level where only the current Code’s prescriptive requirements would be applicable. This could be accomplished in one of two possible means. First, a short length of reinforced wall could be added to the existing, which would mo ve the highest compressive forces away from the existing bars, and woul d contain new bars and confinement complying with Code requirements. Second, if the wall length cannot be increased, a column element that is wider than the wall could be introduced, containing the required confining reinforcement.

3.5.6 Concrete Shear Wall Second Layer of Reinforcing

When calculated in-plane shear stre sses within shear walls exceed a certain threshold, those walls must have two layers of internal reinforcing.

The shear walls currently have one layer of reinforcing, comprised of vertical and horizontal rebar. With the removal of the heavy roof tile and addition of new perimeter shear walls as noted above, the shear stresses 5 254
CC 05-03-2022
254 of 1033

within the walls will likely be reduced to levels such that the second layer is not required.

3.5.7 Concrete Column Reinforcement for Confinement

The existing concrete columns throughout the structure, at both levels, contain longitudinal reinforcement running vertically and transverse, confining tie reinforcement around the lo ngitudinal bars. The ties are of a specific size and occur at a specific spacing. In extreme cases, such as in moderate and major earthquakes, the lateral drift of the structure, combined with the axial forces from the supported structure, can induce extremely high compressive forces in the longitudinal (vertical) column bars. If not confined adequately by ties of sufficient size, at spacing that is close enough, the vertical bars can buckle outward, causing damage to the column, loss of support and possible collapse. Regardless of the calculated forces in the existing columns, the existing column ties do not conform to the current Building Code’s prescriptive requirements for minimum confinement. Thus, supplem ental confinement needs to be added for conformance to the current Code. This added confinement may be required only near the ends of so me columns, or for the full height of the columns, depending on the calculated column loads. Where additional confinement is required, it is recommended that the columns be wrapped with designed layers of carbon fiber and re sin. The total build-up of carbon fiber layers is rela tively thin, and would not adversely affect the spaces where the columns occur.

As indicated in these descriptions, and in general, the noted deficiencies can be addressed and resolved only with a sufficient reduction of the building’s mass through the removal of the heavy clay tile roofing, and with the addition of some lengths of new upper-level concrete shear walls. The recommended alterations combine to reduce the seismic forces acting on the structure, increase the strength and capacities of the load- resisting elements, including the shear walls and collector members. The following key building plan indicates the recommended locations for the proposed added shear walls, which would likely affect the building’s aesthetics and functionality to only a minimal degree.

3.5.8 Equipment Anchorage Capacities Unknown

The capacity of the anchorage of the equipment throughout the building is unknown and warrants a survey of existing on-site conditions, as well as any drawings available that address the methods of anchorage and lateral bracing. The current Building Code excludes some equipment below certain weight limits from requiring anchorage, if the Component Importance Factor (Ip) for determining the anchorage design forces is no higher than 1.0. However, since the entire subject structure is considered an Essential Facility, housing the EOC, the Importance Factor for the overall building’s seismic design, as well as the seismic Component Importance factor, Ip, is 1.50. Thus, the seismic anchorage of all 6 255
CC 05-03-2022
255 of 1033

significant equipment anchorage is governed by the Code. Equipment that should be considered, in particular, includes the following:
 Emergency Generator, including isolators
 Emergency Generator flexible connections for conduit, fuel and coolant piping
 Rooftop HVAC Equipment
 Elevator Equipment
 Electrical Transformers, Panels, Switchgear, Cabinets, etc.  Suspended Light Fixtures
 Ductwork and Piping Supports and Bracing
 Electrical Conduits, Trapezes, Banks and Trays
 Fire Sprinkler Piping
7 256
CC 05-03-2022
256 of 1033
8 257
CC 05-03-2022
257 of 1033
9 258
CC 05-03-2022
258 of 1033
10 259
CC 05-03-2022
259 of 1033
11 260
CC 05-03-2022
260 of 1033

4.0 Architectural Analysis

4.1 Scope

The existing Cupertino City Hall building is a two-story structure containing city administrative and building de partment services as well as the City of Cupertino’s Emergency Operations Center (EOC.) The or iginal building was built completed in 1965 and later renovated in 1986.

This study is based on record documents listed below and received electronically from the city as well as a facility site walk on Feb 14, 2012.
 1965 Drawings for Original Construction
 1986 Drawings for Renovation (except single line Electrical plans)  Current Exiting Diagram included the latest floor layout modifications

The architectural analysis primarily focuses on fire and life safety issues and includes a detailed code compliancy review of the existing City Hall building as an Essential Service Facility. The recommendations follow the analysis and include four alternatives outlined by city representatives and the design team.

The current code, the 2010 California Build ing Code (CBC), and the 1985 Uniform Building Code used for the renovation exhibit significant differences in all chapters. The first step of this analysis was to review the existing building against the 2010 CBC.

Exhibit 4A provides the analysis in detail. Exhibits 4C and 4D show occupancy load calculations, exit occupancy calculations, and required rated wall locations.

The required scope of accessibility modifica tions for the existing building is also summarized to define the extent of potentia l renovation work. Exhibit 4B lists scope requirements from the 2010 CBC Chapter 11B.

4.2 Applicable Codes

The 2010 CBC was used to review code compliancy. The 2010 California Green Building Code (Cal Green) was not used for the analysis of the existing building. Currently, the City of Cupertino does not enforce the Cal Green for the remodel of existing buildings.

The requirements of 2010 ADA Standards for Ac cessible Design is applicable for local government facilities and was also used to review for compliancy.

4.3 Key Fire and Life Safety Issues
The key issues below are extracted from Exhibit 4A - Code Analysis Worksheet.  Occupancy Classification
The existing Council Room is appr oximately 1,300 sf (over 10% of the total floor area of the first floor) with an Occupancy Load of 86. The room cannot be considered an incidental accessory occupancy because it is too large. It needs to be considered an A3 Occupancy, a separate occupancy from rest of the building, which is a B Occupancy.

12 261
CC 05-03-2022
261 of 1033

 Type of Construction
The type of construction is Type VB with an automatic sprinkler system throughout.

 Fire Resistive Separations
Interior Walls:

A 1-hour Fire Barrier separation is required between A and B occupancies. The existing wall is shown as a 1-hour partition in the 1986 drawings. The wall construction above the ceiling needs to be further investigated. The doors in the 1-hour Fire Barrier need to have a 45-minute fire resi stance rating. The existing two doors are labeled with 20-minute ra tings. The label of the third door was covered by finish material and not legible. It will need to be replaced if it cannot be confirmed as compliant. See section

4.5.1 of the 2010 CBC.

Although the 1-hour separation requirement of an incidental use area is exempted because the existing building is equipped with a sprinkler system, the Mechanical Room and Storage Rooms (over 100 sf) require smoke partitions. The 1986 drawings indicate the existing Mechanical Room is enclosed by a 1-hour partition. See section 4.5.2 of the 2010 CBC.

Elevator Shaft Enclosure:

The existing elevator shaft may be deficient. The drawing A2.1 (1986 Renovation) indicates “Carry shaft wall to underside of lobby ceiling”. Fire Barriers need to extend to the underside of the roof sheathing per 707.5 or enclosed at the top with the same fire resistance rating per 708.12. See section 4.5.3 of the 2010 CBC.

Exit Stair Enclosure:

The exit stair enclosure wall needs to be a 1-hour Fire Barrier with a 1-hour rated opening. The existing door on the first floor is labeled as 60-minute. The rating of the door on the basement was not legible and will need to be replaced if it cannot be confirmed as complaint. See section 4.5.4 of the 2010CBC.

 Corridors
The building’s corridors are not required to be separated by fire or smoke partitions because the existing building is A and B Occupancies and equipped with a sprinkler system. The existing corridors open to the public area are rated per the 1986 drawings. The existing openings between the west corridor and the office area are allowed per the current code.

13 262
CC 05-03-2022
262 of 1033

 Interior Finishes
Wall and Ceiling:

Corridors serving the egress of the EOC, West Corridor, Lobby, and South Corridor require Class B finishes on the walls and ceiling.

The existing finish materials need to be further examined to confirm that they meet the ASTM E-84 Class B frame spread rating and the ASTM C 635 or C636 for suspended acoustical ceiling.

See section 4.5.6 of the 2010 CBC.

Floor:

A Class I or II interior floor finish is required in all exit routes. The existing finishes need to be further reviewed and replaced if they cannot be confirmed as compliant. See section 4.5.6 of the 2010 CBC.

 Means of Egress
Occupant Load:

The Occupant Load of the existing building is calculated based upon the area under consideration divided by an occupant load factor per section 1004.1.1 of the 2010 CBC. See Exhibit 4A.

Egress Width:

All existing doors and corridors currently provide more than the required egress width. Exiting occupancies at the exit discharge are:

Basement Terrace 98
Main entrance 57 (113 / 2 exits)
South Corridor Door 35
North Door 29

Accessible Means of Egress:

Accessible means of egress are not required in alterations to existing buildings per section 1007.1 Exception 1 of the 2010 CBC.

Panic Hardware:

Mechanical Room and Transformer Room doors need panic
hardware or fire exit hardwa re per section 1008.1.10 of the 2010 CBC. The existing doors do not have the required hardware.

Vertical Exit Enclosures–Lobby Open Stairs to Basement:

The analysis of the exiting occupancy revealed that the basement floor egress is not code compliant without using the open stairs as means of egress. The 2010 CBC allows for vertical openings in a stairway only if it is not part of means of egress per 708.2 Exceptions; therefore, in order to meet the requirements of the code the stair will require the installation of draft curtains and closely spaced sprinklers. These upgrades based on the interpretation above are believed to be more economical than 14 263
CC 05-03-2022
263 of 1033

converting the open stairway to an enclosed exit stair. See section

3.5.7 of the 2010 CBC.

 Roof Assembly and Rooftop Structure

A roof assembly is required to meet Class A fire test exposure in accordance with the city ordinances. The existing roof equipment shows an incomplete attachment mechanism to the roof deck. See section 3.5.8 of the 2010 CBC.

4.4 Other Issues

4.4.1 Accessibility
The extent of the specific accessibility upgrades will require further study as well as design solutions after a solution is selected. Exhibit 4B describes accessibility requirements for existing buildings.

The 2010 CBC requires that accessibility up grades apply only to the area of specific alteration. The 2010 ADA Standards (Chapter 2, 202) state “each altered element or space shall comply with the applicable requirements”.

The 2010 CBC also outlines construction cost thresholds for specific levels of accessibility upgrades. For a project wher e the construction cost does not exceed $50,000, it requires accessibility compliance only in the area of the actual work and not in supporting areas. For a projec t where the construction cost does not exceed $128,410.86, it allows accessibility compliance to be limited to 20% of the cost of the project. Priority must be given to the accessible elements in the following order.
 sanitary facilities
 drinking fountains
 signs
 public telephone
 additional accessible elements such as parking, storage, and alarms For a project where the construction cost exceeds $128,410.86, the facility must be made fully accessible.

4.4.2 OSHA
Access to all areas for building main tenance will need to meet Cal-OSHA standards. The metal ladder to the roof requires a safety upgrade.

4.4.3 Sustainability
A comprehensive sustainable strategy and specific sustainable solutions are not identified in this report; however, as the project moves to the next phase we would recommend incorporating a sustainable approach into the solution selected.

4.4.4 Architectural & Planning
Several architectural and planning issu es were identified by the building representatives and design team during the Feb 14, 2012 site walk. These items 15 264
CC 05-03-2022
264 of 1033

were captured in the Meeting Minutes, item 2012-02-14.07, and should be addressed if Alternate #3 or Alternate#4 is selected for implementation.

4.5 Recommendations
Four alternative approaches were identified by the City of Cupertino representatives and the design team for the renovation of the existing City Hall facility. These approaches, described belo w, differ in their scope and anticipated construction cost.

Alt #1 No Upgrade: This alternate proposes no modifications to the existing City Hall building and a relocation of the existing EOC to another facility.

Alt #2 Minimum Seismic Upgrade: This alternate proposes modifications to the building structure only to bring the fac ility to a code compliant Essential Service Facility status. No proposed plan changes are proposed in this alternate in order to maintain the ability to “grandfather in” the existing EOC in its current configuration. Only structural items triggered by I-factor improvements and maintenance are intended to be modified. Accessibility upgrade improvements may be triggered in this alternate. The modifications include:
 Replacement of roof tile – as maintenance
 Possible adjustment of roof profile and equipment screen  Connection of collector beam and concrete shear wall
 Additional concrete wall to the main level, if required. (The modification should not affect floor plan and egress)
 Ducts and equipment seismic support
 Accessibility upgrade for 20% of construction cost if required

Alt #3 Moderate Upgrade: This alternate proposes that all Alternate #2 items as well as additional plan modifications to address life safety code updates be implemented. Accessibility upgrade impr ovements would be triggered in this alternate. The modifications include:
 All Alt #2 items
 Fire and Life Safety upgrade to meet 2010 CBC
 MEP upgrades to meet operation requirements as Essential Services Facilities including replacement of HVAC equipment/control, water heater/plumbing pipe, adjustments of sprinkler system, and upgrade of the electrical system after testing and verifications.
 Minimum energy efficiency to meet performance of the existing building  Accessibility upgrade

Alt #4 Replacement – This alternate proposes a new City Hall building that aligns with ideas being proposed in the Civic Center Master Plan Study currently in process with Perkins + Will. This new facility would meet all current codes, incorporate sustainable features, and include Essential Service Facility requirements while at the same time address the specific needs and desires of the building occupants.

16 265
CC 05-03-2022
265 of 1033

These recommendations are based on the findings from the available drawings and observations of the accessible areas during the site walk. As highlighted above, some areas of the existing building have unknown conditions and will require further investigation after an alternate is selected:
 penetrations thru partitions
 above-ceiling conditions
 actual construction of the interior partitions
 storage rooms created during the recent renovation around the EOC  renovated areas in locations where the record drawings were not available

Specific recommendations for the correction of items identified in the code analysis are outlined below. If Alternative #3 or Alternative #4 described above is chosen, all architectural code deficiencies must be integrated into the solution.

4.5.1 1-hour Fire Barrier at Council Room
The existing doors to the Council room n e e d t o b e r e p l a c e d w i t h a t l e a s t 4 5 - minute fire resistance rated doors. The pa rtition may need to be repaired or re- built to meet 1-hour Fire Barrier requirements. The existing rated partition enclosing Council room should be further field investigated.

4.5.2 Smoke Partitions to Mechanical Room and Storage Room The existing doors to the Mechanical Room and Transformer Room need to be replaced with panic hardware. The existing wall and doors enclosing the Mechanical Room need to be rebuilt or repaired to meet smoke partition requirements.

Mechanical Room work space clearances and clear path of travel require further investigation near the 1600 Amp electrica l panel. The room requires either 2 exits with panic hardware or 1 exit door with panic hardware and a clear unobstructed path from panel to exit door, or a single exit door with panic hardware and double the required working space around the panel.

Storage Rooms (areas exceeding 100sf) need to be enclosed by smoke partitions.

The Storage Rooms north of Council Room that were recent additions/modifications exceed 100sf. These walls and doors need to be rebuilt or repaired to meet smoke partition requirements.

4.5.3 Elevator Shaft Enclosure
The construction of the existing elevator shaft enclosure needs further field investigation to verify if it meets the 1- hour Fire Barrier requi rements. The shaft enclosure may either need to extend to the roof sheathing or be enclosed at the top of the shaft with 1-hour fire resistance rated assembly.

4.5.4 60-Minute Door to the Exit Stair at Basement
The exit access door to the existing exit stair should be confirmed as a 60 minute door or replaced with a 60 minute door. The construction of the existing exit stair shaft enclosure needs further field investig ation to verify if it meets the 1 hour Fire Barrier requirements.
17 266
CC 05-03-2022
266 of 1033

4.5.5 Interior Finishes
The finishes of West Corridor, Lobby, and South Corridor need further field investigation to confirm if they meet the current code classifications. The finishes may need to be replaced to meet the requirements.

4.5.6 Lobby Open Stairs to Basement
The existing open stairs from Lobby to the basement should be designated as non- exit stairs. In addition, the draft curtains and closely-spaced sprinklers per NFPA 13 need to be installed. The exit sign should be rearranged accordingly.

4.5.7 Roof Assembly and Rooftop Equipment
The attachment of the roof equipment to the roof deck must be secured following the I factor requirements for the Essential Services Facilities. Reroofing assembly is required to meet Class C roofing.

4.5.8 Replacement of Roof Tile (This item is for Alt #2) As described in the Structural Sectio n 3.4 General Recommendations, the heavy tile roofing should be replaced with a lighter material such as standing seam metal roofing system. A system can be selected to match the appearance of the adjoining buildings in the Civic Center. As the project proceeds an option to integrate photovoltaic panels or film at the roof should be investigated.

18 267
CC 05-03-2022
267 of 1033
Exhibit 4A ‐ Code Analysis Worksheet
This exhibit is prepared to review the code compliancy of the existing City Hall under 2010 California Building Code.

Subject  CBC
Reference
Notes

1.  Building Description
 1 above grade story with 1 below grade basement   Table 503 See 7  OK

2.  Building Height
 Height to highest occupancy Story:   1.8 ft above finish grade (224.9 FG, 226.7 FF)  Height to top of roof:   20’‐11 ½” @ top of beam, 26’ @ top of parapet  Table 503 See 7  OK

3.  Building Separations
 East:    174 ft
 West:     60+ ft  (60 ft to PRW)
 North:    60+ ft   (60 ft to PRW)
 South:  103 ft    (to 1964 PL)
All exceeds 30’ in Table 602 fire Separation distance Table 602 OK

4.  Occupancy
Building Area                         Occupancy
First Floor                               B (Except Concil room: A3, 1,300sf) Basement                               B

Note: EOC Room (former Council Room) will be separated Occupancy from the rest of the building because the area sqft of 1,300sf exceeds 10% of the building area of the floor (508.2.1).  The occupant load of the EOC Room is 1,300/15 = 86.

The two occupancies need to be separated by 1hr fire barrier (Table 508.4 )

508.4

5.  Approximate Building Area
Level 1:      11,520 sf
Basement: 11,520 sf
Total:         23,040 sf

6.  Type of construction
Type V‐B (fully sprinklered)

7.  Allowable Area and Height – Type V‐B (fully‐sprinklered) B occupancy                       A‐3 Occupancy
Allowable / Built                  Allowable / Built
Story (above grade)     2 / 1                                     1 / 1 Height                          40ft / 26 ft                            40ft / 26 ft Floor Area / Story        18,000sf / 11,520sf             12,000sf / 1,300sf

Per 508.4.2
11520/18000 + 1300/12000 = 0.748 < 1.00
Table 503

508.4.2
OK

8.  Fire Resistive Requirements – Type V (fully‐sprinklered) 19 268
CC 05-03-2022
268 of 1033
Subject  CBC
Reference
Notes
 Structural Frame: 0 hrs
 Bearing Walls
o Exterior: 0 hrs
o Interior: 0 hrs
 Non‐bearing Walls
o Exterior: 0 hrs
o Interior: 0 hrs
 Floors: 0 hrs                                       3” concrete floor  Roof: 0 hrs                                         6x6 beam, 2x6 T&G Deck, 5/16” Plywood Table 601 &
602

603.1 &
717.5  OK

9.  Fire Resistive Separations
 1‐hr Fire Barrier separations between B and A1 occupancy  508.4  Incidental Use Areas
o Mech / Boiler Room (031 & 032) –
o Storage over 100 sf (036, 038, New storage north of Council )

1‐hr separation or provide automatic fire extinguishing system – OK w/ Fully sprinklered bldg

Smoke Partition (711; Full ht solid walls w/self‐closing solid drs) is still required
508.2

508.2.5.2
OK

10.  Exterior Walls
 Opening Allowed in exterior walls
 Max area of exterior wall openings allowed: No Limit
Fire Separation distance is > 30’
Table 705.8
OK
 Parapets: not required – exterior wall is not required to be rated  705.11 OK

11.  Interior Walls
 Fire Barriers – separating B & A3 occupancy around fmr. Council Room  707 o Extend from the top of the floor 0 ceiling assembly below to the underside of the floor or roof sheathing.
o Openings are limited to 25 % of length of wall
o Openings are not limited to 156sf if fully‐sprinklered o Opening protection
Wall Type                               Opening Rating
1‐hr shaft / exit enclosures     1 hour
1‐hr fire barrier                        45 min.
707.5

707.6
707.6 exc 1

Table 715
dr & glazing
need
upgrade to
45 min
assembly

 Shaft Enclosures – exit stairs, elevator hoist way  708 o Enclosures to have fire barrier with 1‐hr fire resistance rating o Openings limits are not applicable for for exit enclosures o Opening protection – see above
708.4
707.6
Visually
inaccessibl
e, Need
further
investigatio
n of shaft
termination
above
ceiling
 Corridors – Not req’d to be separated by fire or smoke partitions in A and B occupancy if fully sprinklered.

Table
1018.1  OK
 Enclosed Elevator Lobby
20 269
CC 05-03-2022
269 of 1033
Subject  CBC
Reference
Notes
o not required not mre than 3 stories in Group B 708.14.1 OK o not required for A where the building is fully‐sprinklered 708.14.1 Ex 4  OK

12.  Penetrations
 Thru penetration fire stop systems protecting wall penetrations shall have an F rating equal to the rated wall
713.3.1.2 Visually
inaccessibl
e, Need
further
investigatio
n
 Thru penetration fire stop systems protecting rated horizontal assemblies shall have an F and a T rating of 1 hour or equal to the rated assembly 712.4.1.1.2 Visually
inaccessibl
e, Need
further
investigatio
n

13.  Interior Finish  803.1
 Wall and ceiling finishes per ASTM E‐84, Class A, B & C / NFPA 286  Flame spread Req
Area Served                                     Rating
Exit Enclosures                                 B
Corridors Serving A Occupancy       B
Other rooms & corridors                   C
Table 803.9

 Suspended acoustical ceilings per ASTM C 635 or C636  808.1.1.1 ?  Class I or Class II interior floor finish req’d in all exit route  804.4.1 ?

14.  Automatic Sprinkler system – per MEP analysis 903.2.1.3 OK

15  Means of Egress
 Occupant load
Is established in Figure 1 based upon the area under consideration divided by an occupant load factor
Table
1004.1.1
OK
 Egress width  1004
o Considered for floors individually 1004.4 OK
o Stairways – factor .3 in
o Other egress component – factor .2 in
1005.1
OK

 Lighting  1006.2 Noted in
Elect
Section
o 1 fc –at walking surfaces f exit access, exits, and exit discharge o 10 fc – at walking surface of stairs during use
o Emergency power 90min min 1006.4
 Accessible means of egress  1007.1
o Accessible means of egress are not required in alterations to existing buildings
1007.1 Ex 1
OK
 Doors
o Shall have a clear width of at least 32 in and no door leaf shall be greater than 48 in – all egress doors exceed required width
1008.1.1
OK
o With limitations, egress doors may include: 1008.1.4 OK 21 270
CC 05-03-2022
270 of 1033
Subject  CBC
Reference
Notes
 Revolving doors
 Power‐operated doors
 Access‐controlled doors
o Panic hardware is required on exit doors from
 A occupancies
 Elect rooms rated over 1200 A – check with Electrical.

1008.1.10  OK

 Stairways
o Min width is 44 in unless serving fewer than 50 people, except accessible egress stairs
o Handrails may extend 4 ½” from stair wall into req’d clear width 1003.3.3
1012.7
OK

o At accessible egress stairs, the stairs are req’d to have a min clear width between handrails of 48 in min width is 44 in unless serving fewer than 50 people, except accessible egress stairs

7.2.12.2.3 n/a per
1007.1 Ex.

OK
o Min headroom clearance is 80 in 1009.2 OK
o Riser height
 Min 4 in,  Max 7 in
1009.3
OK
o Ramps (for exiting)
o Max slope – 1:12
o Max cross slope – 1:48
o Max vert rise – 30 in
o Ramps with rise greater than 6 in shall have handrails on both sides

1010.3
1010.4
1010.8
n/a
OK
 Handrails and guards
o Shall be provided on both sides of stairs and ramps with risers grater than 6 in
1009.10 Need
further
review
o Intermediate handrails to be provided so that all parts of egress capacity on stairs and ramps area within 30 in of a handrail
1012.8

o Guards required on elevated surfaces with an adjacent droop more than 30 in
1013.1

o Guards to be 42 in high min 1013.2
o Not allow a 4 in diameter sphere to pass 1013.3

 Exit Signs
o Not required in rooms or areas requiring only one exit 1011.1 OK o Required at exit and exit access doors and other areas so that no place in a corridor is more than 100 ft from an exit sign
1011.1
OK
o Exit sign may be either internally or externally illuminated 1011.2 OK o Illumination required to be on emergency power with 90 min duration  1011.5 OK

 Exit Access
o Egress shall not pass through adjoining rooms except where such rooms are accessory to the area served, are not high‐hazard, and provide a discernible path to an exit
1014.2
OK
o When two or more exits are required, they shall be separated by one third the diagonal dimension of the space
 fmr Council – 2 exits provided
 Mech room – 2 exits provided
1015.1

1015.1
1015.3  OK
 Travel Distance
o Max allowable travel distance from any location to an exit A3: 250 ft (w/ fully‐sprinklered) Table  OK
22 271
CC 05-03-2022
271 of 1033
Subject  CBC
Reference
Notes
B: 300 ft (w/ fully‐sprinklered) 1016.1
 Common path of travel distance
o The max allowable common path of travel distance from any location to a point where occupants have a choice between two separate exit paths is limited to 100 feet for Group B and S
1014.3
OK
 Corridors in sprinkler protected B or S may be non‐rated  Table 1018.1  OK
o Corridor width to be OL x 0.2 but not less than 44”
o 36” with a required occupant capacity of less than 50 1005,
1018.2
1018.2 Ex  OK
o Dead ends may not exceed 50 feet in B
 Min number of exits
o OL 1‐500 – 2 exits required 1021 OK

 Vertical Exit Enclosures
o Required rating – 1‐hr
o A max of 50% of exit capacity is permitted to egress through areas in the level of discharge w/ three conditions check (1.2 floor rating of 3” conc) o Stairs to the building permit counter should not be used for egress, to be “communicating stair”
1022.1
1027.1 Ex

Adjust exit
sign
accordingly

 Exterior Exit Stairs and Ramps
o Exterior exit stairways can be used in a means of egress o Must be open at one side
o Not required to have separation per exceptions
1026.2
1026.3
1026.6 Ex.

OK
OK
OK

 Exit Discharge
o A max of 50% of exit capacity is permitted to egress through areas in the level of discharge w/ three conditions check
1027.1 Ex
OK

16  Roof Assembly and Rooftop Structures
 Roofing Classifications – Class A is required per City of Cupertino Ordinances  Table 1505.1
Classificatio
n of (E)
roof
assembly is
unknown.
 Existing roof  replacement – more than 50%  of the total roof area is replaced within any one‐year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair, or replacement of the roof of every existing structure shall be a fire–retardant roof covering that is at least Class C
1505.1.3 To be Class
A per City
of
Cupertino
Ordinances

23 272
CC 05-03-2022
272 of 1033
Exhibit 4B ‐ Accessibility for Existing Buildings
This Exhibit is prepared to summarize the required accessibility upgrade for the existing buildings per 2010 CBC.

Subject  CBC
Reference
Notes

1.  Accessibility for Existing Buildings  1134B
 Provisions apply to renovation, structural repair, alteration and addition to existing buildings
 No decreased accessibility of existing buildings
 Requirements  shall apply only to the area of specific alteration structural repair of addition
o Primary entrance to the building
o Primary path of travel to the specific area of alteration, structural repair or addition
o Followings that serves the ar
ea of alteration, structural repair or addition
 Sanitary facilities
 Drinking fountains
 Signs
 Public telephone
1134B.1

1134B.2

Exceptions #1
 Total construction cost does not exceed $128,410.86 (Jan 2010)  Unreasonable hardship is where exceeds 20% of the cost of the project without these features (disproportionate cost)
 Access shall be provided to the extent that it can be within 20% of the cost of project
 Priority is to these elements that will provide the greatest access following order o An accessible en
trance
o An accessible route to the altered area
o At least one accessible restroom for each sex
o Accessible telephones
o Accessible drinking fountains
o When possible, additional accessible elements; parking storage and alarms
 3 years duration of accumulated cost when the
re are many small work
 Alterations  after Jan 1992 shall be considered in determining if the cost of providing a accessible path of total is disproportionate Exceptions #2
 n/a ‐ Re: privately funded project
Exceptions #3
 Accessibility improvement work itself is limited to the actua l work of the project Exceptions #4
 Work limited to
o HVAC
o Re‐roofing
o Electrical (not included switches and receptacles)
o Cosmetic work
1134.2.1 Ex.

 Alternative uni‐sex per floor will be permitted if technically infeasible  1134B.2.2

24 273
CC 05-03-2022
273 of 1033
Exhibit 4D Basement Floor Occupancy Load and Exit Diagram Exhibit 4C First Floor Occupancy Load and Exit Diagram 25 274
CC 05-03-2022
274 of 1033

5.0 Mechanical, Electrical, Plumbing, Fire Protection Analysis

5.1 Scope
The main goal of this report is to evaluate the MEP equipment and infrastructure serving the Cupertino City Hall and the EOC. The evaluation of the existing MEP systems is being performed according to the following overall facility improvement alternatives:
 Alt #1 No Upgrade - Relocation of EOC
 Alt #2 Min Seismic Upgrade – Duct, pipe, and equipment seismic support (per I factor change)
 Alt #3 Moderate Upgrade - Alt #2 items, Fire & Life Safety upgrade to meet 2010 CBC, MEP upgrade to meet operation requirements as Essential Services Facilities, Energy efficiency to meet performance of the existing building  Alt #4 Replacement – New Building

5.2 Applicable Codes and Standards
Codes:

State of California Code of Regulations (CCR).
2010 California Building Code.
2010 California Electrical Code.
2010 California Mechanical Code.
2010 California Plumbing Code.
2010 California Fire Code.
2010 California Energy Code, Title 24 – 2008
2010 California Green Code, CALGreen
City of Cuppertino Municipal Code
Standards:

ASHRAE Standard 62.1-2010 – Ventilation
ASHRAE Standard 55-2010 – Thermal Comfort
ASHRAE Standard 90.1-2010: Energy Standard for Buildings except Low-Rise Residential Buildings
AMCA – Air Movement and Control Association International, Inc.

ANSI – American National Standards Institute.
26 275
CC 05-03-2022
275 of 1033
ARI – Air Conditioning and Refrigeration Institute.

SMACNA – Fire and Smoke Damper Installation Guide.

SMACNA – Guidelines for Seismic Restraints of Mechanical Systems.

SMACNA – Standards for Duct Construction.

NEMA – National Electrical Manufacturer’s Association.

NEMA - National Electrical Manufacturers Association.

NECA - National Electrical Contractors Association.

IEEE - Institute of Electrical and Electronic Engineers.

UL – Underwriters Laboratories.

NFPA - National Fire Protection Association.

NFPA 90A – Air Conditioning and Ventilating Systems.

NFPA 101 – Life Safety Code.

NFPA 13 – Standard for the Installation of Sprinkler Systems.

5.3 Mechanical HVAC Systems

5.3.1 Heating and Cooling Systems
The HVAC system for the Cupertino City Hall consists of a water-cooled chiller plant (70 Ton) with the cooling tower located on the roof and the chiller located on the lower level. A gas fired non-condensing boiler generates heating hot water.

The boiler is from the 1965 original building construction and is well past its life time. Both of these systems provide chilled and heating hot water to the Air Handling Units (AHU’s) located at the lower level that heat and cool the building through a VAV reheat design. All equipment was installed in ~1986 and is now 26 years old and at the end of its useful life. While the equipment appears to be well maintained, and the AHU’s have been retrofitted with VFD’s, the building operates inefficiently at a rate of $3.63/SF-Year and 106 kBTU/SF-Year (based on 2009 utility bills). A modern, energy efficient office building operates at $1.50/SF-Year and 50 kBTU/SF-Year.

The Cupertino City Hall has a small server room that is cooled by split system AC units, with air-cooled condensers located on the roof. The AC units for the server room appear to have been installed more recently that the rest of the HVAC equipment.

27 276
CC 05-03-2022
276 of 1033

Figure 5A (Closed-Circuit 70 Ton Cooling Tower)

Figure 5B (Water-cooled 70 Ton Chiller)

In the lower level mechanical room, maintenance clearances and an exit pathway may not exist throughout the space. In addition, the combination of chiller, gas boiler, electrical gear, and generator equipment do not meet today’s code 28 277
CC 05-03-2022
277 of 1033
requirement to have separate rooms for each of these pieces of equipment. The room is also not equipped with a refrigerant detection and exhaust systems currently required for chiller rooms, and the combustion air ducts in the boiler room need to be routed to an outdoor location.

Figure 5C (Gas Fired Boiler)

Figure 5D (Server room AC unit (1 of 2))
29 278
CC 05-03-2022
278 of 1033
Recommendations

Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Upgrade all duct, pipe, and equipment anchorage and seismic attachments to building structure. Replace duct and pipe connections with flexible joints where required.

Alt #3 Moderate Upgrade: Replace existing HVAC equipment with smaller, more efficient, better comfort equipment design.

Alt #4 Replacement: New HVAC systems for new building.

5.3.2 Ventilation
The existing AHU’s air intake is located in an airwell that does not provide good air quality air for building occupants. The amount of fresh air brought into the building is not enough by today’s standards and codes, and should be increased and improved.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: No work.

Alt #3 Moderate Upgrade: Obtain fresh air from a different location (i.e. roof louvers) and increase amount of fresh air.

Alt #4 Replacement: New HVAC systems for new building.

5.3.3 Controls
The existing control system is and outdated pneumatic system that does not allow for remote monitoring or the implementation of common energy efficiency strategies in modern buildings. In addition the pneumatic controls system requires more maintenance to upkeep the compressor, air filter, and other mechanical systems required to run the system.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: No work.

Alt #3 Moderate Upgrade: Replace existing system with modern DDC controls system.

Alt #4 Replacement: New HVAC systems for new building.

30 279
CC 05-03-2022
279 of 1033

5.4 Plumbing Systems

5.4.1 Plumbing Fixtures
The existing plumbing fixtures are functioning and meet current code.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: No work.

Alt #3 Moderate Upgrade: No work.

Alt #4 Replacement: New plumbing systems and fixtures for new building.

5.4.2 Domestic Water System
The domestic water piping appears to be copper. An AO Smith boiler gas fires water heater provide domestic hot water to all building plumbing fixtures. The water heater appears to have been installed with the last 5 years.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Upgrade all plumbing pipe and equipment anchorage and seismic attachments to building structure.

Alt #3 Moderate Upgrade: Replace existing plumbing pipe (cold and hot water).

Replace existing water heater with a high efficiency heat pump water heater.

Alt #4 Replacement: New plumbing systems and fixtures for new building.

5.5 Fire Protection Systems

5.5.1 Fire Sprinkler system
The bulling is fully sprinklered and testing station appears to be in proper operating condition given the test log dates.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Upgrade all fire protection pipe and equipment anchorage and seismic attachments to building structure.

Alt #3 Moderate Upgrade: Replace existing pipe and sprinkler heads inside building to match renovation intent.

Alt #4 Replacement: New fire protection system for new building.

31 280
CC 05-03-2022
280 of 1033

5.6 ELECTRICAL

5.6.1 Electrical Systems Summary
This report is an evaluation of the Cupertino Essential Services building electrical systems, located at Rodrigues and Torre Avenue, in Cupertino, California. The data used to develop this report was collected during one site visit conducted on February 15, 2012, as well as interviews of the staff working at the building.

During the field visit, we observed the site conditions and systems exposed to visual observation. No testing or destructive investigation was performed.

Additional information about the building’s power distribution system was gathered by reviewing the building plan sets made available in PDF format. The walk through was intended to evaluate the effectiveness of the existing Electrical systems.

This report provides an overview of existing conditions of the electrical system, identification of potential weaknesses in the systems and suggested improvements to the systems.

All major electrical equipment appear to be original and in working condition. The main distribution equipment is nearly 47 years old and has past its expected useful life. The generator is nearly 34 years old and has passed its useful life.

The existing light fixtures are in serviceable condition. As a possible energy saving project, the building management may want to consider replacing the existing lights with more energy efficient T5, T8, LED, and compact fluorescent fixtures. Another energy saving technique would be to upgrade the lighting control system and incorporate occupancy sensors and/or daylight sensors in addition to using time clock controls.

The main service to the City Hall space is a rated at 1000A at 208V, 3-phase system and provides power for a load density of approximately 12.5 W (or 15.5 VA, using 0.8 power factor) per square foot for the entire building, which is adequate for the current loads.

5.6.2 Assessment of Existing Conditions
Normal Power
Utility Transformer
The building is fed from a utility transformer (PG&E) located outside the building. 32 281
CC 05-03-2022
281 of 1033

Figure 1E (PG&E Transformer)

The secondary power from the transformer to the main switchboard is provided via (4) sets of 4” underground conduits.

The main switchboard is rated 1600A, 208/120V, 3-phase, 4-wire and is located inside the main electrical room.

General Condition
The transformer belongs to PG&E and was recently upgraded. It appears to be in good working condition.

Code Issues
No code issues.

Recommendation:

Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Confirm with PG&E if the new transformer meets current Seismic code
Alt #3 Upgrade: No work. Transformer was recently upgraded.

Alt #4 Replacement: Transformer was recently upgraded.

Main Switchboard
The Main Switchboard is rated at 2000A, 120/208V, 3 phase, 4 wire with a 1600A main breaker manufactured by Industrial Electric Manufacturing, Inc. The main switchboard is feeding a distribution panel via a 1,000Amp breaker. This switchboard serves the City Hall.
33 282
CC 05-03-2022
282 of 1033
The table below summarizes the load on each panel.

Table 5.1 (Panel Load)
Name Size Load Serving

MSB 2000A Section Library,
Future Public Safety Building,
ATS for Generator

Panel DP 1000A Section PANEL F,

PANEL C,

PANEL A,

PANEL E,

PANEL B,

PANEL D,

PANEL G (MCC)

CHILLER,
Future E.O.C. Panel

G (MCC) 600A Pump 1, 2, 3, 4, 5, 6,
Cooling Tower Fan
A/C Fan Basement
A/C Fan 1st Floor
A/C Fan 1st Floor
Remote Radiator
Fuel Pump

34 283
CC 05-03-2022
283 of 1033

Figure 5F (Main Switchboard)

General Condition
The main switchboard appears to be of the original construction and in working condition, although past its useful life. In general, the switchboard is adequately sized to support the existing loads.

Code Issues
Maintenance clearances and exit pathway are required to be investigated around the 1600 Amp electrical panel. Electrical panel is over 1200 Amps, thus requiring either (A) 2 exits with panic hardware, or (B) 1 exit door with panic hardware but a clear and unobstructed path from Panel to exit door, or (C) a single exit door with panic hardware but double the required working space around the Panel.

Recommendation
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Provide adequate support suitable for the seismic and earthquake condition.

Alt #3 Upgrade: The existing main distribution switchboard shall have regular preventative maintenance procedure per NETA (National Electrical Testing Association) standards.

Megger test existing feeders.

Test overcurrent protective devices in the switchboard for proper operation. 35 284
CC 05-03-2022
284 of 1033
Alt #4 Replacement: In order to ensure reliable power distribution to the building and reduce service needs in the future, we recommend the main switchboard be replaced with a new model.

5.6.3 Emergency Power
The emergency power system consists of a generator rated at 125KW, 208/120V and is located inside the main electrical room. The fuel tank, with 1000 gallon capacity, is located outside the room. In the event of a power outage, the generator provides power to the panel DP via a 400A automatic transfer switch (ATS) located in the main electrical room. The generator also provides power to the Chiller but the pump must be “jump” to move chilled water. The generator does not serve the existing elevator. or the chiller, as confirmed by discussions with facility personnel.

Figure 5G (Indoor Generator)

General Condition
The generator was installed in 1978, making it nearly 34 years old, which has exceeded its useful life. It appears to be operational, as confirmed by facility personnel.

Code Issues
No code issues
Recommendation
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Provide adequate support suitable for the seismic and earthquake condition.
36 285
CC 05-03-2022
285 of 1033
Alt #3 Upgrade: The generator should at the minimum be tested per manufacturer’s recommendation to confirm its operation, and the batteries tested to confirm capacity and condition as well.

Alt #4 Replacement: The existing generator is currently loaded to its full capacity.

In order to increase reliability and provide assurance of operation in the future, it is recommended that the generator be replaced with a new unit. We also recommend upsizing the generator to 175kW or above and its associated automatic transfer switch to 500A or above to provide capacity to serve additional loads such as the elevator and any future loads.

5.6.4 Grounding System
The service ground was not readily visible at the Main Switchboard. Feeder and branch circuit ground conductor sizes were not verified. Bonding to the building mechanical systems was not confirmed.

General Condition
No hazard has been identified with the current grounding system.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: No work
Alt #3 Moderate Upgrade: The grounding electrode resistance should be verified and supplemented as needed with additional ground rods. The mechanical and plumbing system bonding should be verified.

Alt #4 Replacement: Provide new grounding system to meet current code.

5.6.5 Lighting
Interior Lighting
The existing lighting system consists mostly of recessed and pendant mounted fluorescent linear T8 32/26 watts source fixtures, with additional recessed incandescent downlight fixtures.

Illumination levels were observed to be uniform and adequate in all common area corridors, offices, work areas, and equipment rooms. Emergency exit signs are provided throughout the building according to Code. Emergency and egress lighting is provided by selected normal fixtures fed by emergency circuits from the generator.Exit lights are LED with battery back-up. Bug-eye type supplemental emergency fixtures was provided in the boiler room.

General Condition
Light fixtures appear to date back to the original construction and are in fair condition, with no operational issues.

Code Issues
37 286
CC 05-03-2022
286 of 1033
Perform functional testing of all existing emergency lighting and measure light levels for code compliance.

Install additional emergency lighting as necessary after the functional testing of the existing installation to provide current code required minimum egress illumination.

Recommendations
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Provide adequate support suitable for the seismic and earthquake condition.

Alt #3 Moderate Upgrade: If improvements to the lighting system are to occur, the existing outmoded T12 source fixtures should be replaced with new higher efficiency T8, T5 or LED source fixtures to reduce energy usage. Newer fixtures will also provide better light distribution and higher uniformity to increase occupant comfort. Any existing incandescent source fixtures should be replaced with higher efficiency compact fluorescent source fixtures.

Alt #4 Replacement: Similar to Alternative 3

5.6.6 Lighting Controls
The existing general lighting is controlled by local switches located within the corridors and at the each room. Lighting in the Kitchen, bathrooms, stairwell and conference room “A” is controlled by motion sensors. Relay control panels provide time schedule control for corridors and general areas, and dimming equipment provides dimming functionality to meeting rooms.

Recommendation
Alt #1 No Upgrade: No work.

Alt #2 Min Seismic Upgrade: Provide adequate support suitable for the seismic and earthquake condition.

Alt #3 Moderate Upgrade: Ceiling mounted occupancy sensors can be added to individual rooms to automatically switch on one-half or all of the fixtures when occupancy is detected and switch off all fixtures when no one is present, to take advantage of irregular occupancy intervals. A time delay of 30 minutes or less can be used to minimize nuisance switching.

To meet current code, reduce energy use, and increase the effectiveness and flexibility of the lighting installation, it is recommended that automatic and multilevel lighting controls be installed in every space.

Alt #4 Replacement: As the perimeter office areas receive good access to daylight, ceiling mounted photosensors may used to provide automated dimming of the perimeter fixtures according to the amount of daylight available, further reducing the lighting load. The existing fluorescent source fixtures within the 38 287
CC 05-03-2022
287 of 1033
perimeter daylight area will need to be provided with dimming ballasts in order to integrate with the photosensor input.

In addition, both occupancy sensing and daylight harvesting through photosensors can be employed together. This will keep lights off when the space is unoccupied and also dim the light output when sufficient daylight is available in order to maximize the energy saving potential.

39 288
CC 05-03-2022
288 of 1033
Meeting Minute s
By: Haji Ishikawa Date: 2/15/2012
Meeting Date: 2/14/2012 Project Name: Cupertino City Hall Essential Services Facility Study
Meeting Time: 10am - 1pm Project No.: 491204.000
Meeting
Location:

Cupertino City Hall
Conference Room C
Attendees: See Attached Sign-In Sheet
Next Meeting
Date:
2/21 1:30pm-2:30pm
Conference Call
Discussion
Items in bold are new, items in italics are revised.

Item No. Description Responsibility Status
Introductions and Scope of Work
2012-02-14.01 Goal of the study is to evaluate Essential Facilities status of the current Emergency Operation Center (EOC) in the City Hall can be maintained by:
1) Upgrade the building to meet the code requirement, OR 2) Relocate EOC out of the City Hall
If any options are desirable the City will be incorporating into the master plan.

Information
Only
n/a
2012-02-14.02 Carmen (Project Manager, Public Works) and Haji (Perkins + Will) will be the day-to-day contacts between the City team and the consultants team.

Information
Only
n/a
Review of Reference Documents
2012-02-14.03 3 CDs with the record pdf drawings from the 1965, 1987 construction, and the current exit plan diagrams were
handed to the consultant team. P+W to share with the
consultants team.

P+W Closed 2/15
2012-02-14.04 There are additional retrofit work after 1987 renovation:
• Council Room area, Main Floor
• NW Open Office, Main Floor
• SW Storage area, Basement
Consultants to refer to the current exit plans for these revisions.

Information
Only
n/a
40 289
CC 05-03-2022
289 of 1033
Item No. Description Responsibility Status
Deliverables
2012-02-14.05 Priority in architectural analysis will be items associated with Fire & Life Safety.

Information
Only
n/a
2012-02-14.06 The City intends to bring Nova Partners to the project to provide cost estimating service.

Information
Only
n/a
2012-02-14.07 The City identified the following additional information and concerns for the consultants team to better understand the context.
1) The wall opening near west corridor on the main level has rating issue. It affected the occupancy certificate of the 1987 renovation.
2) The weight of the tile roof is not helping the structural capability.
3) The City is looking for clean and efficient means of achieving what is required.
4) The operation cost of the current building is
substantially high. Although a specific energy savings target has not been established,
the City is interested in
improvement. The City will share the energy study
report for the MEP consultants to review.
5) The City experiences temperature control difficulty for the occupants, especially during the transition of the
seasons. Some occupants use portable space heaters.
6) Adaption of a new accessibility code is forthcoming.

Concerns on discrepancies between the federal (Dept.
of Justice) standard and CBC Ch. 11 were discussed.

For this study the consultants team will use 2010 CBC.
7) In addition to the study based on 2010 CBC, the
consultants team will identify the foreseeable potential issues that can be effected by the 2013 CBC adaption.
8) Electrical use is currently maxed out. The 1987
renovation gave some improvement.
9) The City shared the idea of installing solar panels on the roof.
10) PG&E has upgraded the transformer serving the
building.
11) The current plan does not provide visual access to the most heavily used areas for the visitors. A receptionist is required at the lobby.
12) The City is looking for a holistic solution if EOC needs to be relocated.
13) In order to have a new City Hall the current building needs to be either deficient or unfixable.
14) The current parking satisfies only 54% to 84% of the demand.
15) IT related space needs expansion and improvement in function.
16) The server room at NW corner provides capacity for
buildings beyond the City Hall.
17) Solid proposal /options are required to be developed before submittal to the council.
18) The City will provide the environmental hazard report to Information
Only

n/a

41 290
CC 05-03-2022
290 of 1033
Item No. Description Responsibility Status
the consultant team.
19) The City experienced a flood problem in the sunken
terrace area and the basement; however the existing
sump tank should be sufficient.

Information
Only

n/a
Schedule and Milestones
2012-02-14.08 The proposed milestone works with City’s subsequent activities.
• 2/14 (Tue) Site Visit and kick-off Meeting
• 2/21 (Tue) Clarifications Conference Call
• 2/28 (Tue) Issue Electronic Rough Draft
• 3/5 (Mon) Rough Draft Comment Response
Conference Call
• 3/9 (Fri) Final Report
• 3/13 (Tue) Cost Estimate Meeting (to be confirmed)

Information
Only
n/a
Other Issues
2012-02-14.09 City encourages the consultants’ team to lead the process for delivery of the report.

Information
Only
n/a

End of Document
42 291
CC 05-03-2022
291 of 1033
43 292
CC 05-03-2022
292 of 1033

From: Ishikawa, Haji
Sent: Tuesday, February 21, 2012 6:05 PM
To: Terry Greene ([email protected]) ([email protected]) Cc: '[email protected]' ([email protected]); Hooshang Pakzadan (hooshang.pakzadan@pae- engineers.com); Marco Alves ([email protected]); Seastone, Susan; [email protected]
Subject: Cupertino City Hall: Target Alternatives

Terry,

Below is the key scope items of the four different alternatives that we discussed  in the teleconference  today.  I would like to share this with the consultants  team as a target to sort out our recommendations  after the analysis is done.  Please let us know if you have any comments.

For the Alt #4, my assumption is a new construction after demolition  of the existing building.

Please clarify.

Facility Improvement  Alternatives

Alt #1 No Upgrade
· Relocation of EOC

Alt #2 Min Seismic Upgrade  – with items triggered by I factor improvement · Replacement  of roof tile – as maintenance
· Possible adjustment of roof profile & equipment screen · Connection of collector  beam and concrete shear wall · Additional concrete wall to the main level, if req’d. (should not affect floor plan and egress) · Ducts & equipment seismic support (per I factor change) · 20% of cost for ADA upgrade

Alt #3 Moderate  Upgrade
· All Alt #2 items
· Fire & Life Safety upgrade to meet 2010 CBC
· MEP upgrade to meet operation requirements as Essential Services Facilities · Energy efficiency to meet performance  of the existing building · ADA upgrade

Alt #4 Replacement  –New Construction
· Meet all the current  codes
· Improve  architectural  and planning issues
44 293
CC 05-03-2022
293 of 1033
Thank you,
Haji

Haji Ishikawa , AIA, LEED AP BD+C

185 Berry St., Lobby One, Suite 5100, San Francisco, CA 94107 t: 415.856.3015 f: 415.856.3001 e: [email protected] www.perkinswill.com | Facebook | Twitter

Perkins+Will. Ideas + buildings that honor the broader goals of society

This email and any files transmitted with it are confidential and intended solely for the addressee.

If you are not the named addressee you should not disseminate, distribute, copy, or alter this email.

Please consider the environment before printing this email.

From: Ishikawa, Haji
Sent: Thursday, February 16, 2012 10:37 AM
To: Marco Alves ([email protected]); '[email protected]' ([email protected]) Cc: Seastone, Susan
Subject: Cupertino City Hall: Additional Information

Marco, Tim,
After the Tuesday meeting Terry Greene mentioned his expectation  of the range of recommendations.   We need to further get into the study before deciding the format, but I’d like to share his input with you.

1.   Do nothing  – I understood this means relocation of the EOC

2.   Min renovation – Likely limited to structural  scope

3.    Moderate renovation – Terry hopes that this doesn’t trigger full ADA upgrade (by exceeding $129,000 construction  cost).  But from structural  point of view Tim thinks even the option #2 min renovation could exceed the threshold.

4.    Substantial Renovation – I understand  this would improve most of the City’s concerns expressed in the meeting (and beyond) to make the building more efficient and functional.

We will be issuing the minutes from Tuesday kick‐off  this shortly.  I have also started a simple architectural  code summary of the existing building.  I will share with both of you by the end of the day today.

Thanks,
Haji

Haji Ishikawa , LEED AP BD+C
Senior Project Architect
185 Berry St., Lobby One, Suite 5100, San Francisco, CA 94107 t: 415.856.3015 f: 415.856.3001 e: [email protected] www.perkinswill.com | Facebook | Twitter
45 294
CC 05-03-2022
294 of 1033
Perkins+Will. Ideas+ buildings that honor the broader goals of society

This email and any files transmitted with it are confidential and intended solely for the addressee.

If you are not the named addressee you should not disseminate, distribute, copy, or alter this email.

Please consider the environment before printing this email. 46 295
CC 05-03-2022
295 of 1033
Attachment G4
296
CC 05-03-2022
296 of 1033
297
CC 05-03-2022
297 of 1033
298
CC 05-03-2022
298 of 1033
299
CC 05-03-2022
299 of 1033
300
CC 05-03-2022
300 of 1033
301
CC 05-03-2022
301 of 1033
302
CC 05-03-2022
302 of 1033
303
CC 05-03-2022
303 of 1033
304
CC 05-03-2022
304 of 1033
305
CC 05-03-2022
305 of 1033
306
CC 05-03-2022
306 of 1033
307
CC 05-03-2022
307 of 1033
308
CC 05-03-2022
308 of 1033
309
CC 05-03-2022
309 of 1033
310
CC 05-03-2022
310 of 1033
ATTACHMENT G5
311
CC 05-03-2022
311 of 1033
312
CC 05-03-2022
312 of 1033
313
CC 05-03-2022
313 of 1033
314
CC 05-03-2022
314 of 1033
315
CC 05-03-2022
315 of 1033
316
CC 05-03-2022
316 of 1033
317
CC 05-03-2022
317 of 1033
318
CC 05-03-2022
318 of 1033
319
CC 05-03-2022
319 of 1033
320
CC 05-03-2022
320 of 1033
321
CC 05-03-2022
321 of 1033
322
CC 05-03-2022
322 of 1033
323
CC 05-03-2022
323 of 1033
324
CC 05-03-2022
324 of 1033
325
CC 05-03-2022
325 of 1033
326
CC 05-03-2022
326 of 1033
327
CC 05-03-2022
327 of 1033

APPENDICES

S
tructural Calculations by AKH

Structural Calculations by Kirk McFarland Engineers
328
CC 05-03-2022
328 of 1033
AKH Structural Engineers, Inc. Phone (408) 978-1970
1505 Meridian Avenue, Suite B Fax (408) 267-7919
San Jose, CA 95125 www.akhse.com
Structural Calculations
Cupertino City Civic Center
Project Number: M05-036 Date: October 2011
Project Engineer: Ward Code: 1985 UBC
Seismic Zone: 4 Wind Zone: 70 mph
Checked By: Hyde Date:

Original Signature Required
To Be Valid Seal
EXP. 3/ 31 / 1 3
No. S3260
329
CC 05-03-2022
329 of 1033

TABLE OF CONTENTS
Loads G1 - G2
Lateral Analysis
L1 - L15
(computer print-out follows these pages)
Girder Analysis B1 - B2
Design References:

1. Uniform Building Code, 1985 Edition

2. Building Code Requirements for Structural Concrete (ACI 318-83)

3. Manual of Steel Construction, 8th Edition
330
CC 05-03-2022
330 of 1033
G1STRUCTURAL LOADS
ROOF TYPE #1: Existing Tile RoofSlope, in/ft.: 4
Material Decking Purlins Beams Seismic
Spanish Tile Roofing 21.0 21.0 21.0 21.0
1/2" Plywood 1.5 1.5 1.5 1.5
3x Decking 8.0 8.0 8.0 8.0
Insulation 0.5 0.5 0.5 0.5
Fire Sprinklers 4.0 3.0 2.0
Ceiling - Suspended wood w/ tile 5.0 5.0 5.0
Purlins - 6x16 @ 6'-0" o.c. 3.5 3.5 3.5
Beams - 16B31 @ 24'-0" o.c. 1.5 1.5
Beams - 7"x19-1/2" Glue-lam beam 1.0 1.0
Miscellaneous 5.1 3.9 4.3 2.5
Sub-Total: 36.1 47.4 49.3 46.5
Slope Factor 2.0 2.6 2.7 2.5
TOTAL DEAD LOAD: 38.0 50.0 52.0 49.0 psf
ROOF TYPE #2: Existing Built-upSlope, in/ft.:0.25
Material Decking Joists Beams Seismic
Roofing - Built-up, gravel6.5 6.5 6.5 6.5
1/2" Plywood 1.5 1.5 1.5 1.5
Insulation 0.5 0.5 0.5 0.5
Fire Sprinklers 4.0 3.0 2.0
Joists - 2x14 @ 16" o.c. 4.0 4.0 4.0
HVAC Equipment 5.0 5.0 5.0
Ceiling - Suspended wood w/ tile 5.0 5.0 5.0
Beams - 21WF55 @ 24'-0" o.c. 2.5 2.5
Miscellaneous 4.5 4.5 4.0 2.0
Sub-Total: 13.0 31.0 32.0 29.0
Slope Factor 0.0 0.0 0.0 0.0
TOTAL DEAD LOAD: 13.0 31.0 32.0 29.0 psf
ROOF TYPE #3: Existing Covered WalkSlope, in/ft.: 2
Material Decking Purlins Beams Seismic
Spanish Tile Roofing 21.0 21.0 21.0 21.0
1/2" Plywood 1.5 1.5 1.5 1.5
2x Decking 4.5 4.5 4.5 4.5
Insulation 0.5 0.5 0.5 0.5
Fire Sprinklers 4.0 3.0 2.0
Purlins - 4x14 @ 6'-0" o.c. 2.5 2.5 2.5
Beams - 16B31 1.5 1.5
Beams - 10"x18" conc. 16.0 16.0
Miscellaneous 4.8 3.9 3.6 1.7
Sub-Total: 32.3 37.9 54.1 51.2
Slope Factor 1.7 2.1 2.9 2.8
TOTAL DEAD LOAD: 34.0 40.0 57.0 54.0 psf
Calculations: Loads
10/6/2011 Page 1
331
CC 05-03-2022
331 of 1033
G2FLOOR TYPE #1:

Material Slab Joists Beams Seismic
Flooring 4.0 4.0 4.0 4.0
Concrete Slab, 3" 37.5 37.5 37.5 37.5
Fire Sprinklers 4.0 3.0 2.0
Ceiling 2.5 2.5 2.5
Joists - 6"x12" @ 3'-0" o.c.29.0 29.0 29.0
Ribs - 6"x12" @ 24'-0" o.c. 3.5 3.5 3.5
Beams - 16"x33" @ 24'-0" o.c. 26.0 26.0
Miscellaneous 4.5 4.5 3.5 1.5
Sub-Total: 46.0 85.0 109.0 106.0
Partitions 20.0 20.0 20.0
TOTAL DEAD LOAD: 46.0 105.0 129.0 126.0 psf
WALL TYPE #1: Stud Wall w/ Gyp Board Each Side
Material Weight
Studs @ 16" o.c. 1.5
Gypsum Board 5.0
Miscellaneous 1.5
TOTAL WEIGHT: 8.0 psf
WALL TYPE #2: Stud Wall w/ Spanish Tile One Side & Plywood One Side -- Mansard Material Weight
Studs @ 16" o.c. 2.5
Spanish Tile Roofing 21.0
1/2" Plywood - 2 sides 3.0
Built-up Roofing, cap 2.0
Miscellaneous 1.5
TOTAL WEIGHT: 30.0 psf
WALL TYPE #3: 6" Concrete 75 psf
WALL TYPE #4: 10" Concrete 125 psf
WALL TYPE #5: 12" Concrete 150 psf
WALL TYPE #6: 18" Concrete 225 psf
LIVE LOADS: Floor
Office Areas 50 psf
Corridors & Lobbies 100 psf
Assembly, Open 100 psf
LIVE LOADS: Roof 0 - 200 201 - 600 > 600 sq. ft.

Slope < 4:12 20 16 12 psf
Slope 4:12 to < 12:12 16 14 12 psf
Slope > 12:12 12 12 12 psf
Calculations: Loads
10/6/2011 Page 2
332
CC 05-03-2022
332 of 1033
L1LATERAL ANALYSIS & DESIGN
Earthquake Data:

Seismic Zone 4 (UBC Figure No. 1)
The building was originally designed in 1964 as a non-essential facitlity. The upper level of the building lateral system consists of existing wood roof diaphragm and concrete shear walls. The lower level consists of a concrete joist floor system over concrete walls & columns. The lower portion was originally a full basement. In 1986, modifications & upgrades were made to the building. The North side of the building was excavated to the depth of the basement and the North basement wall opened up to a new patio. The building currently houses the City's Emergency Operations Center and is therefore an essential facility.

Note: The following analysis is to verify that the existing building, including the 1987 modifications, is adequate as an essential facility under the 1985 Uniform Building Code.

Calculations: Lateral
10/6/2011 Page 1

LOWER LEVEL PLAN
Calculations: Lateral
10/6/2011 Page 1
333
CC 05-03-2022
333 of 1033
L2
Calculations: Lateral
10/6/2011 Page 2

UPPER LEVEL PLAN
Building Mass:

Roof Area Unit Load Mass Roof height hr = 18 ft.

Flat Roof 3456 29 100224
Tile Roof 8281 49 405769
Walkway 5808 54 313632
Mansard 1440 30 43200
Ext. Walls 396 75 29700
Partitions 11305 5 56525
Columns 297 150 44550
Total wr = 993600
lbs ==> 993.6 kips
Floor Area Unit Load Mass Floor height hf = 12 ft.

Floor 14464 106 1533228
Ext. Walls 345 225 77625
Ret. Walls 345 150 51750
Int. Walls 1157 75 86738
Partitions 11305 10 113050
Columns 234 150 35100
Total wf = 1897491
lbs ==> 1897.5 kips
Calculations: Lateral
10/6/2011 Page 2
334
CC 05-03-2022
334 of 1033
L3SEISMIC FACTORS
Seismic Base Shear:

V = ZIKCSW
Z = 1 (Zone 4 - Figure No. 1)
I = 1.5 (Essential Facility - Table No. 23-K)
At Upper Level:

K = 1 (Framing System - Table No. 23-I)
hn = 18 ft. D = 137 ft.

T = 0.05 * hn / (D)1/2 = 0.077 sec.

C = 1 / [15 * (T)1/2] = 0.240 > 0.12 Therefore, use C = 0.12 S = 1.5 (Soil Type S3 for unknown soil)
CS =

0.18 > 0.14 Therefore, use CS = 0.14
V = 0.210 W
At Lower Level:

K = 1.33 (Shear Wall System - Table No. 23-I)
hn = 12 ft. D = 121 ft.

T = 0.05 * hn / (D)1/2 = 0.055 sec.

C = 1 / [15 * (T)1/2] = 0.285 > 0.12 Therefore, use C = 0.12 S = 1.5 (Soil Type S3 for unknown soil)
CS = 0.18 > 0.14 Therefore, use CS =0.14
Calculations: Lateral
10/6/2011 Page 3
CS = 0.18 > 0.14 Therefore, use CS =0.14
V = 0.279 W
Elements of Structures: Wall Seismic Factor:

F p = ZICpW p
Cp = 0.3 (Bearing Walls - Table No. 23-J)
F p = 0.450 W p
Diaphragm & Collector Seismic Factor:

F px = (ΣF n/Σwn)wpx
Max. Fpx = 0.30ZIwpx = 0.450 wpx
Min. Fpx = 0.14ZIwpx = 0.210 wpx
For one-story building, Fpx = V for Upper Level
F px = 0.210 wpx < Max. Fpx = 0.450 wpx
F px = 0.210 wpx = Min. Fpx = 0.210 wpx
F px = 0.210 wpx
Calculations: Lateral
10/6/2011 Page 3
335
CC 05-03-2022
335 of 1033
L4Upper Level Seismic Loads:

Wood frame roof with plywood diaphragm. Concrete shear walls.

Height H = 12 ft. Note: All wall thicknesses t = 6 in.

Note: Wall rigidities are of fixed-fixed walls: R = t / [0.1(H/L)3 + 0.3(H/L)] Wall Length L Rigidity Relative R Wall Length L Rigidity Relative R SW1.2.1 7 5.893 0.5 SWA.2.1 8.5 8.512 0.452
SW1.2.2 7 5.893 0.5 SWA.2.2 9.5 10.336 0.548
ΣR = 12 ΣR = 19
SW5.2.1 7 5.893 0.5 SWF.2.1 13 16.874 0.741
SW5.2.2 7 5.893 0.5 SWF.2.2 7 5.893 0.259
ΣR = 12 ΣR = 23
Total Base Shear V = 208.66 kips
Load to each shear wall line F2 = 104.33 kips
Wall Shear Wall Shear
SW1.2.1 52.16 SW5.2.1 52.16
SW1.2.2 52.16 SW5.2.2 52.16
"1" Total: 104.33 "5" Total: 104.33
Wall Shear Wall Shear
SWA.2.1 47.12 SWF.2.1 77.32
SWA.2.2 57.21 SWF.2.2 27.01
"A" Total: 104.33 "F" Total: 104.33
Out of Plane Loads to Upper Level Walls
12 ft. high x 6" thick walls spanning from podium slab to roof Fp = 0.45 (150pcf x 0.5ft) = 33.75 psf
Assuming pin-pin wall connections (top & bottom)
vmax = Fp x H/2 = 202.5
lbs/ft.

M = Fp x H2/8 = 607.5 ft-lbs
Calculations: Lateral
10/6/2011 Page 4
Mmax = Fp x H2/8 = 607.5 ft-lbs
unsupported length, lu = 144 inches
radius of gyration, r = 0.3 x 6" = 1.8 inches
kl/r = 1.0*lu/r = 80
> 22, slenderness effects must be considered
Load combinations to consider:

1.05D + 1.28L + 1.4E 0.9D+ 1.1E
See Enercalc analysis of slender wall
6" wall w/ #4 @ 12"o.c. ea. way is adequate to span vertically Anchorage for out-of-plane loads:
existing 7/8"dia. x 12" a.b. w/ 3" edge distance:

Allowable shear, V = 4.15k - [(5.25-3)(4.15-2.075)/(5.25-2.63)] = 2.37 kips/bolt (per 1985 UBC table 26-G for 3ksi concrete)
Reaction at top of walls, R = 0.204 klf (ASD)
for 7' long wall, number of A.B. required = R x 7/V = 1 bolt for 13'-10" long wall, number of A.B. required = R x 13.83/V =2 bolts See Enercalc Anaysis of Slender Wall

DEFICIENCIES
: None
Existing Concrete Walls at the Upper Level are adequate for Out-Of-Plane Bending, Deflection and for Anchorage.

Calculations: Lateral
10/6/2011 Page 4
336
CC 05-03-2022
336 of 1033
L5Lower Level Seismic Loads:

Concrete floor slab. Concrete shear walls.

Height H = 12 ft.

Note: All wall thicknesses t = 12in., except along Line 5, where t =18 in.

Note: Wall rigidities are of fixed-fixed walls: R = t / [0.1(H/L) 3 + 0.3(H/L)]
Wall Length L Rigidity Relative R Wall Length L Rigidity Relative R SW1.1.1 48 156.735 0.680 SWA.1.1 97.5 323.367 1.000
SW1.1.2 24 73.846 0.320
ΣR = 231 SWF.1.1 97.5 323.367 1.000
Wall Line 5: Wall has new window & door openings due to 1986 modifications.

Header height H1 = 3.875 ft.

Pier height H2 = 5.75 ft.

Sill height H3 = 2.375 ft.

Note: Wall deflections are of fixed-fixed walls: ∆ = [0.1(H/L)3 + 0.3(H/L)] / t Wall Length L Rigidity Relative R Wall Length L Deflection SW5.1.1 9.33 86.416 0.238 Header 121 0.0005
SW5.1.2 5.67 44.061 0.121
SW5.1.3 6.25 50.866 0.140
SW5.1.4 6.25 50.866 0.140
SW5.1.5 5.67 44.061 0.121 Wall Length L Rigidity Relative R SW5.1.6 9.33 86.416 0.238 Sill 51.92 1310.749 0.500
ΣR = 362.686 2621.498

0.0028 0.0004
∆Total = ∆Header + ∆Piers + ∆Sills = 0.0037 in.

R Total = 1/∆Total = 272.287
ΣR = 2 * R =
∆Sills = 1/ΣR =∆Piers = 1/ΣR =
Calculations: Lateral
10/6/2011 Page 5
Calculations: Lateral
10/6/2011 Page 5
337
CC 05-03-2022
337 of 1033
L6Total Base Shear V = 530.0 kips from lower level mass only Depth D =

97.5 ft.

Length L = 121 ft.

Transverse (N-S) load WN-S = V / L = 4.38 kip/ft.

Longitudinal (E-W) load WE-W = V / D = 5.44 kip/ft.

Load to each wall line from upper level F1 = 104.33 kips Longitudinal seismic distribution, see Enercalc Torsional Analysis of Rigid Diaphragm Program, following pages.

Load to each shear wall line:

Line Shear Total Shear
1 406.15 510.48 kips
5 153.58 257.91 kips
A 282.88 387.21 kips
F 282.88 387.21 kips
Roof Diaphragm
Diaphragm length L = 97 ft. Entire length L1 = 121 ft.

Diaphragm depth D = 121 ft. Entire depth D1 = 145 ft.

Note: The seismic coefficients for base shear & the diaphragm force, at the upper level, are equal to each other.

Diaphragm force Fpx = V = 208.66 kips
Transverse Direction:

Diaphragm shear v = Fpx * (D / D1) * 1000 / L / 2 = 898 plf Existing diaphragm is 1/2" CD-X plywood over 3x T&G decking w/ 10d @ 6" o.c. at all edges, blocked.

Allowable shear for plywood vap = 325
plf (UBC Table No. 25-J-1)
Allowable shear for decking vad = 100 plf (UCBC values.) Allowable shear va = vap + vad = 425 plf < v = 898 plf NG! Overstress = 111.2% > 5.0% NG!
Calculations: Lateral
10/6/2011 Page 6
Overstress = 111.2% > 5.0% NG!
Longitudinal Direction:

Diaphragm shear v = Fpx * (L / L1) * 1000 / D / 2 = 691 plf Existing diaphragm is 1/2" CD-X plywood over 3x T&G decking w/ 10d @ 6" o.c. at all edges, blocked.

Allowable shear va = 425
plf < v = 691 plf NG!
Overstress = 62.6% > 5.0% NG!
Existing Roof Diaphragm Is Highly Overstressed. Therefore, Diaphragm Is NOT Adequate.

DEFICIENCIES: Insufficient Amount Of Diaphragm Nailing -- Diaphragm Nail Spacing Is Too Large.

Calculations: Lateral
10/6/2011 Page 6
338
CC 05-03-2022
338 of 1033
L7Chord & Collector Stresses
Existing chord/collector is 16B31 (W16x31) A36 steel w/ splice plate 1/4"x9"x12" on both sides & (3) 5/8"φ M.B.'s (A307 steel) at each end -- bolts are in double shear. (Note: Originally, there was only a single splice plate, but in the 1986 upgrades, an additional splice plate was added to the opposite side.) Bolts:
db = 0.625 in. d'b = db + .0625" = 0.6875 in.

Beam:
tw = 0.275 in. A = 9.12 in2
F y = 36 ksi F u = 58 ksi
Plates:
tp = 0.25 in. dp = 9 in.

F y = 36 ksi F u = 58 ksi
Allowable shear load on bolts = 6.1 * 3 * 1.33 =24.3 kips Allowable tension load on plates (gross) = 0.60 * Fy * (2 * tp * dp) * 1.33 = 129.3 kips Allowable tension load on plates (net) = 0.50 * Fu * {2 * tp * [dp - (3 * d'b)]} * 1.33 = 133.8 kips Allowable tension load on beam (gross) = 0.60 * Fy * A * 1.33 = 262.0 kips Allowable tension load on beam (net) = 0.50 * Fu * [A - (3 * tw * d'b)] * 1.33 = 329.9 kips Min. allowable load = 24.3 kips <== Bolts capacity governs.

Existing 16B31 perimeter beams are anchored to top of concrete shear walls w/ 7/8"φ A.B.'s (A307 steel).

Allowable shear load on anchor bolts = 4.15 * 1.33 = 5.52 kips (UBC Table No. 26-G) Chord Stress:

Line A (Line F Same)
Chord stress T = Fpx * D 2 / 8 / L / D1 = 27.2 kips
Allowable load = 24.3 kips < T = 27.2 kips NG!
Overstress = 11.5% > 5.0% NG!
Calculations: Lateral
10/6/2011 Page 7
Line 1 (Line 5 Same)
Chord stress T = Fpx * L2 / 8 / D / L1 = 16.8 kips
Allowable load = 24.3 kips > T = 16.8 kips OK
Collector Stresses:

Line A
Force to Line A FA = 104.33 kips
See Program PL-02 - Collector Stress Analysis, following pages.

Max. collector load to SWA.2.1 = 26.9 kips
Max. collector load to SWA.2.2 = 41.4 kips
Max. collector load F = 41.4 kips
Check splice connection:

Allowable load = 24.3 kips < F = 41.4 kips
NG!
Overstress = 70.1% > 5.0% NG!
Check wall anchorage:

Number of anchor bolts N at SWA.2.1 = 6 anchor bolts
Allowable load = 5.52 * N = 33.1 kips > F = 26.9 kips
OK
Number of anchor bolts N at SWA.2.2 = 8 anchor bolts
Allowable load = 5.52 * N = 44.2 kips > F = 41.4 kips
OK
Calculations: Lateral
10/6/2011 Page 7
339
CC 05-03-2022
339 of 1033
L8Line F
Force to Line F FF = 104.33 kips
See Program PL-02 - Collector Stress Analysis, following pages.

Max. collector load to SWF.2.1 = 26.9 kips
Max. collector load to SWF.2.2 = 27.9 kips
Max. collector load F = 27.9 kips
Check splice connection:

Allowable load = 24.3 kips < F = 27.9 kips
NG!
Overstress = 14.6% > 5.0% NG!
Check wall anchorage:

Number of anchor bolts N at SWF.2.1 = 10 anchor bolts
Allowable load = 5.52 * N = 55.2 kips > F = 26.9 kips
OK
Number of anchor bolts N at SWF.2.2 = 4 anchor bolts
Allowable load = 5.52 * N = 22.1 kips < F = 27.9 kips
NG!
Overstress = 26.4% > 5.0% NG!
Line 1 (Line 5 Same)
Force to Line 1 F1 = 104.33 kips
See Program PL-02 - Collector Stress Analysis, following pages.

Max. collector load F = 45.3 kips
Check splice connection:

Allowable load = 24.3 kips < F = 45.3 kips
NG!
Overstress = 86.0% > 5.0% NG!
Check wall anchorage:

Number of anchor bolts N = 7 anchor bolts
Allowable load = 5.52 * N = 38.6 kips < F = 45.3 kips NG! Calculations: Lateral
10/6/2011 Page 8
Allowable load = 5.52 * N = 38.6 kips < F = 45.3 kips NG! Overstress = 17.2% > 5.0% NG!
DEFICIENCIES: Insufficient Number Of Bolts At Each Beam End At Splice Connection.

Existing Anchorage of 16B31 Perimeter Beams To Top Of Concrete Shear Walls, for In-plane shear, Is Overstressed. Therefore, Beam Anchorage Is NOT Adequate.

DEFICIENCIES: Insufficient Number Of Anchor Bolts From Perimeter Beams To Top Of Most Concrete Shear Walls for In-Plane Shear. Walls With Insufficient Anchor Bolts Include All Walls Along Lines 1 & 5 and Wall Along Line F, Near Line 5 Corner.

Existing 16B31 (W16x31) Perimeter Beam Splice Connection, for Collector and Chord forces, Is Highly Overstressed. Therefore, Beam Splice Connection Is NOT Adequate.

Calculations: Lateral
10/6/2011 Page 8
340
CC 05-03-2022
340 of 1033
L9Shear Walls
Upper Level:

Wall SW1.2.1 (Walls SW1.2.2, SW5.2.1, & SW5.2.2 Similar) Wall height H = 12 ft.

Wall length L = 7 ft.

Wall thickness t = 6 in.

Roof tributary width 1 Lr1 = 12 ft. Roof tributary width 2 Lr2 = 4 ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 5.63 kips at 3.5 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 6.3 kips at 3.5 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 1.3 kips at 6 ft. from base of wall.

Applied lateral load F = 52.16 kips at 12 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 887.2 ft.-kips > φMn = 361.6 ft.-kipsNG!
Overstress = 145.4% > 5.0% NG!
Check existing dowelling from wall base to foundation wall:

Vu = 74.8
kips
Existing #5 dowels @ 6" o.c.:φ = 0.85
d = 0.8 * L * 12 = 67.2 in. s = 6 in.

Avf = 0.31 in2
fy = 40 ksi
f'c = 3.5 ksi bw = t = 6 in.
φVs = φ * (Avf * fy * d / s) = 118.1 kips
φVc = φ * [2 * (f'c)1/2 * b * d] = 40.6 kips
φV = φV + φV = 158.6 kips < φV = φ * [10 * (f')1/2 * b * d] = 202.8 kips Calculations: Lateral
10/6/2011 Page 9
φVn = φVs + φVc = 158.6 kips < φVc = φ * [10 * (f'c)1/2 * b * d] = 202.8 kips φVn = 158.6 kips > Vu = 74.8 kips OK
Note: Starting with the 1967 UBC, (vertical) boundary members & boundary ties were required for shear walls that were part of dual systems with frames (K = 0.80). However, in the 1985 UBC, the boundary member requirements were changed to include all shear walls in general.

DEFICIENCIES
: Boundary Members Required. Double Layer of Reinforcing Required.

Existing Concrete Shear Walls Along Lines 1 & 5 Are Highly Overstressed in In-Plane bending.

Therefore, Walls Are NOT Adequate.

Calculations: Lateral
10/6/2011 Page 9
341
CC 05-03-2022
341 of 1033
L10Wall SWA.2.1
Wall height H = 12 ft.

Wall length L = 8.5 ft.

Wall thickness t = 6 in.

Roof tributary width 1 Lr1 = 12 ft. Roof tributary width 2 Lr2 = 4 ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 6.83 kips at 4.25 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 7.7 kips at 4.25 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 1.6 kips at 6 ft. from base of wall.

Applied lateral load F = 47.12 kips at 12 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 805.1 ft.-kips > φMn = 285.4 ft.-kipsNG!
Overstress = 182.1% > 5.0% NG!
Check existing dowelling from wall base to foundation wall:

Vu = 74.8
kips
Existing #5 dowels @ 6" o.c.:φ = 0.85
d = 0.8 * L * 12 = 81.6 in. s = 6 in.

Avf = 0.31 in2
fy = 40 ksi
f'c = 3.5 ksi bw = t = 6 in.
φVs = φ * (Avf * fy * d / s) = 143.3 kips
φVc = φ * [2 * (f'c)1/2 * b * d] = 49.2 kips
φVn = φVs + φVc = 192.6 kips < φVc = φ * [10 * (f'c)1/2 * b * d] = 246.2 kips φVn = 192.6 kips > Vu = 74.8 kips OK
Calculations: Lateral
10/6/2011 Page 10
Existing Concrete Shear Wall Along Line A Is Highly Overstressed in In-Plane bending.

Therefore, Wall Is NOT Adequate.

DEFICIENCIES: Boundary Members Required.

Calculations: Lateral
10/6/2011 Page 10
342
CC 05-03-2022
342 of 1033
L11Wall SWA.2.2
Wall height H = 12 ft.

Wall length L = 9.5 ft.

Wall thickness t = 6 in.

Roof tributary width 1 Lr1 = 12 ft. Roof tributary width 2 Lr2 = 4 ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 7.64 kips at 4.75 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 8.6 kips at 4.75 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 1.8 kips at 6 ft. from base of wall.

Applied lateral load F = 57.21 kips at 12 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 976.2 ft.-kips > φMn = 406.2 ft.-kipsNG!
Overstress = 140.3% > 5.0% NG!
Wall SWF.2.1
Wall height H = 12 ft.

Wall length L = 13 ft.

Wall thickness t = 6 in.

Roof tributary width 1 Lr1 = 12 ft. Roof tributary width 2 Lr2 = 4 ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 10.45 kips at 6.5 ft. from left end of wall.

Existing Concrete Shear Wall Along Line A Is Highly Overstressed in In-Plane bending.

Therefore, Wall Is NOT Adequate.

DEFICIENCIES: Boundary Members Required. Double Layer of Reinforcing Required.

Calculations: Lateral
10/6/2011 Page 11
Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 10.45 kips at 6.5 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 11.7 kips at 6.5 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 2.5 kips at 6 ft. from base of wall.

Applied lateral load F = 77.32 kips at 12 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 1320.0 ft.-kips > φMn = 699.2 ft.-kipsNG!
Overstress = 88.8% > 5.0% NG!
Existing Concrete Shear Wall Along Line F Is Highly Overstressed in In-Plane bending.

Therefore, Wall Is NOT Adequate.

DEFICIENCIES: Double Layer of Reinforcing Required.

Calculations: Lateral
10/6/2011 Page 11
343
CC 05-03-2022
343 of 1033
L12Wall SWF.2.2
Wall height H = 12 ft.

Wall length L = 7 ft.

Wall thickness t = 6 in.

Roof tributary width 1 Lr1 = 12 ft. Roof tributary width 2 Lr2 = 4 ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 5.63 kips at 3.5 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 6.3 kips at 3.5 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 1.3 kips at 6 ft. from base of wall.

Applied lateral load F = 27.01 kips at 12 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 464.7 ft.-kips > φMn = 232.4 ft.-kipsNG!
Overstress = 100.0% > 5.0% NG!
DEFICIENCIES: Boundary Members Required.

Existing Concrete Shear Wall Along Line F Is Highly Overstressed in In-Plane bending.

Therefore, Wall Is NOT Adequate.

Calculations: Lateral
10/6/2011 Page 12
Calculations: Lateral
10/6/2011 Page 12
344
CC 05-03-2022
344 of 1033
L13Lower Level:

Wall SW1.5.1 (Walls along gridline 5 similar)
Wall height H = 5.75 ft.

Wall length L = 5.67 ft.

Wall thickness t = 18 in.

Roof tributary width 1 Lr1 = ft. Roof tributary width 2 Lr2 = ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 0.00 kips at 2.835 ft. from left end of wall.

Wall weight Ww = 150 * t * H * L / 12 / 1000 = 7.3 kips at 2.835 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 1.5 kips at 2.875 ft. from base of wall.

Applied lateral load F = 27.40 kips at 5.75 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 236.7 ft.-kips > φMn = 115.3 ft.-kipsNG!
Overstress = 105.3% > 5.0% NG!
Wall SW1.1.2 (Walls along gridline 1 similar)
Wall height H = 13 ft.

Wall length L = 25 ft.

Wall thickness t = 12 in.

Roof tributary width 1 Lr1 = ft. Roof tributary width 2 Lr2 = ft.

Roof load Wr = [(49 * Lr1) + (54 * Lr2)] * L / 1000 = 0.00 kips at 12.5 ft. from left end of wall.

Existing Concrete Shear Walls Along Line 5 Are Adequate in In-Plane Shear, Bending and for Compressive Forces Due to Overturning.

DEFICIENCIES: None
Calculations: Lateral
10/6/2011 Page 13
Wall weight Ww = 150 * t * H * L / 12 / 1000 = 48.8 kips at 12.5 ft. from left end of wall.

Wall seismic weight Fw = 0.210 * W w = 10.2 kips at 6.5 ft. from base of wall.

Applied lateral load F = 119.50 kips at 13 ft. from base of wall.

See Program PC-02 - Concrete Shear Wall, following pages.

Max. Mu = 2268.0 ft.-kips < φMn = 2293.0 ft.-kipsOK
Overstress = -1.1% < 5.0% OK
DEFICIENCIES: Double layer or reinforcing required
Existing Concrete Shear Walls Along Line 1 Are Adequate in In-Plane Shear, Bending and for Compressive Forces Due to Overturning.

Calculations: Lateral
10/6/2011 Page 13
345
CC 05-03-2022
345 of 1033
B1Girder Check
Applied Loads:

Dead Load =
109 psf GIRDERS
Dead Load = 83 psf JOISTS
Live Load = 50 psf for office spaces
100 psf for assembly, corridor spaces
Live Load reduction L = Lo(0.25+15/sqrt(KLLA T))
K LL = 2 for interior beams
A T = 768 sq. ft. for 32 ft. span girder > 400 sf, reducible 576 sq. ft. for 24 ft. span girder > 400 sf, reducible
no LL reduction for joists
LLoffice = 41.5 psf at 24 ft. span (> 0.5LL, OK)
LLassembly = 60.0 psf at 32 ft. span (no reduction for public assembly) LLcorridor = 63.3 psf at 32 ft. span (> 0.5LL, OK)
PDL Beam B4 = 2600 lbs (framing into girder on gridline E) fy main rebar = 40 ksi
fy ties = 40 ksi
slab effective width used for girder flange:
overhanging flange shall be
smallest of: 8 x slab thickness = 24 in. <-- governs
clear span/2 = 136.02 in.
total width is 2 x 24in + 16in =64 in.
total shall not exceed girder span/4 =

68.01 in.

Calculations: Girders
10/6/2011 Page 1
slab effective width used for joist flange:
overhanging flange shall be
smallest of:
8 x slab thickness = 24 in. <-- governs
clear span/2 = 136.02 in.
total width is 2 x 24in + 12in =60 in.
total shall not exceed joist span/4 =

68.01 in.

Floor Live Load reduction:

A trib = 768 sf A trib = 576 sf
can be reduced at a rate of 0.08 percent of area supported by the member R = 49%
Rmax = 40% <---governs, reduced LLcorridor can be 40psf, LLoffice can be 20psf; Rmax = 48%
50 psf used in all spaces in original analysis
See Enercalc Analyses for Joists & Girders
Calculations: Girders
10/6/2011 Page 1
346
CC 05-03-2022
346 of 1033
B2Original Design; Shear in Girders
Working Stress Design 1964 UBC:

Vmax = 60700 lbs (from original shear diagrams)
vallow = 90 psi for 3ksi concrete w/ stirrups
V' = Vmax - vallow(bjd) = 19120 lbs shear carried by web reinforcement sreq'd = A vfvjd/V' = 13.3 in. Stirrups provided at 12" spacing Current Design; Shear in Girders
Strength Design 2010 CBC:

Vc = 62474 lbs f'c = 3500 psi
fVc = 46855 lbs for (2) #3 tie legs, s = 0.22(40000)33"/Vs = 290400 /Vs fVc/2 = 23428 lbs
Vu
Vs <fVc/2?
spcg for
A vmin1
spcg for
A vmin2
spcg for
A v spacing
80000
44193 no 12.4 11 6 6
70000 30860 no 12.4 11 9 9 Per Enercalc Analysis:
65000 24193 no 12.4 11 12 11 Vu max = 78730 lbs
60000 17526 no 12.4 11 16 11
φVn for ties @ 12" = 65000 lbs
50000 4193 no 12.4 11 69 11 max overstress = 1.21
40000 0 no 12.4 11 not req'd 11
30000 0 no 12.4 11 not req'd 11
Deflection limitations
1964 UBC & 2010 CBC
L/360 for LL
L/240 for DL + LL
50 psf LL
Calculations: Girders
10/6/2011 Page 2
L/240 for DL + LL
50 psf LL
32' span D limit = 1.07 in. (LL only)

1.60 in. (DL + LL) Dmax = 0.154 in.
24' span D limit = 0.80 in. (LL only)

1.20 in. (DL + LL) Dmax = 0.039 in.

Long term deflections due to creep
For 32' span girder
lD = z/(1+50r') = 1.41
in.

Total long term deflection = lD + Dmax = 1.57 in. which is still within code limits for Total Deflection
Existing Concrete Girder Along Line C Is Adequate in Flexure, But is Overstressed in Shear at Two Columns (Gridlines 2 & 3).

DEFICIENCIES: Shear Reinforcement Spacing is Too Large at Some Locations Calculations: Girders
10/6/2011 Page 2
347
CC 05-03-2022
347 of 1033
Concrete Slender Wall ENERCALC, INC. 1983-2011, Build:6.11.9.30, Ver:6.11.8.1 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 5 OCT 2011, 12:38PM
Description : Existing 6" wall
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

General Information
Min Allow Out-of-Plane Defl Ratio = L / 150.0Rebar at wall center =Minimum Vertical Steel % 0.0020
Wall Thickness 6.0in
Bar Size 4#
Bar Spacing 12.0in
=Width of Design Strip 12.0in

1.0λ
Rebar "d" distance in3.0
Lower Level Rebar . . .

Temp Diff across thickness deg F=3.50ksi

40.0ksi
Fr : Rupture Modulus 295.80psi
ρ
3,372.17ksi
Max % of balanced 0.60
144.0pcf=
=Max Pu/Ag = f'c *
=

0.060
Using Stiffness Reduction Factor per ACI R.10.12.3=: Lt Wt Conc Factor Calculations per ACI 318-08 Sec 14.8, IBC 2009, CBC 2010, ASCE 7-05 =
Ec : Concrete Elastic Modulus
=
=
Concrete Density
=f'c : Concrete 28 day strength
Fy : Rebar Yield
One-Story Wall Dimensions

12.0 B
Roof Attachment
A
Floor Attachment
B Parapet height ft=
=Clear Height
Top & Bottom Pinned
A ft
Wall Support Condition
Vertical Loads

0.880 0.2560
Vertical Uniform Loads . . . ( Applied per foot of Strip Width) Ledger Load
Concentric Load
DL : Dead Load
k/ft
k/ft
Lr : Roof Live Load Lf : Floor Live Load S : Snow Load
Eccentricity in
Lateral Loads

15.0 Fp 1.0 = 34.0psf
Full area WIND load
psf Wall Weight Seismic Load Input Method : Direct entry of Lateral Wall Weight Seismic Wall Lateral Load 34.0psf

DESIGN SUMMARY
Actual Values . . . Allowable Values . . .Governing Load Combination . . .

Axial Load Check
+1.40D at 5.20 to 5.60
Max Pu / Ag 26.631psi 0.06 * f'c 210.0psi
Reinforcing Limit Check As/bd =0.005556Controlling As/bd +1.40D

0.02598
Service Deflection Check
D + L + S + E/1.4
Min. Defl. Ratio Max Allow Ratio9,242.33 150.0PASS
FAIL
PASS
Max. Deflection 0.01558in Max. Allow. Defl. 0.960in
PASS
Moment Capacity Check
+1.050D+1.280Lr+1.40E Max Mu 0.8592k-ft Phi * Mn 2.046k-ft Maximum Bending Stress Ratio = 0.420PASS
Minimum Moment Check
+1.40D
k-ft
Top Horizontal E Only
Base Horizontal
E Only 0.2040k
rho bal
Maximum Reactions . . . for Load Combination....

Results reported for "Strip Width" of 12.0 in

0.2040k

0.50 Vertical Reaction
D + L + Lr 2.0k
Mcracking 1.7331.775 Minimum Phi Mn k-ft
348
CC 05-03-2022
348 of 1033
Concrete Slender Wall ENERCALC, INC. 1983-2011, Build:6.11.9.30, Ver:6.11.8.1 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 5 OCT 2011, 12:38PM
Description : Existing 6" wall
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Moment Values 0.6 *
Design Maximum Combinations - Moments

0.06*f'c*b*t
Axial Load
Load Combination Phi MnMu
k
Pu Mcr As RatioAs EffAs rho bal
in^2k-ft in^2k k-ftk-ft
Phi

0.0056 0.248 0.00

2.08 15.120 0.200 0.0260 1.917 0.88 1.77+1.40D at 5.20 to 5.60

0.0056 0.243 0.86 2.05 15.120 0.200 0.0260 1.736 0.88 1.77+1.050D+1.280Lr+1.40E at 5.60 to 6.00

0.0056 0.230 0.67 1.96 15.120 0.200 0.0260 1.207 0.89 1.77+0.90D+1.10E at 5.60 to 6.00 Moment Values DeflectionsStiffness
Design Maximum Combinations - Deflections
Axial Load
Load Combination I crackedMactualPu Mcr Defl. Ratio
in^4k-ft k-ft in^4 in^4 ink
DeflectionI effectiveI gross

0.0 0.000 0.00

13.02 1.597 216.000 216.00 1.77D + L + Lr at 5.60 to 6.00 14,963.8 0.010 0.27 12.73 1.341 216.000 216.00 1.77D + L + W at 5.60 to 6.00 14,963.8 0.010 0.27 12.73 1.341 216.000 216.00 1.77D + L + W + S/2 at 5.60 to 6.00 29,927.6 0.005 0.14 12.73 1.341 216.000 216.00 1.77D + L + S + W/2 at 5.60 to 6.00 9,242.3 0.016 0.44 12.73 1.341 216.000 216.00 1.77D + L + S + E/1.4 at 5.60 to 6.00 21,368.9 0.007 0.19 12.88 1.469 216.000 216.00 1.77D + 0.5(L+Lr) + 0.7W at 5.60 to 6.00 9,427.5 0.015 0.43 12.88 1.469 216.000 216.00 1.77D + 0.5(L+Lr)+ 0.7E at 5.60 to 6.00 Top Horizontal Vertical @ Wall Base
Reactions - Vertical & Horizontal
Base HorizontalLoad Combination
D Only 0.0 0.00

1.744k k k
S Only 0.0 0.00 0.000k k k
W Only 0.1 0.09 0.000k k k
E Only 0.2 0.20 0.000k k k
D + L + Lr 0.0 0.00 2.000k k k
D + L + S 0.0 0.00 1.744k k k
D + L + W + S/2 0.1 0.09 1.744k k k
D + L + S + W/2 0.0 0.05 1.744k k k
D + L + S + E/1.4 0.1 0.15 1.744k k k
349
CC 05-03-2022
349 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line 1 & 5
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 121 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 7 1 6
2 7 113 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 862.2 plf
Shear Wall Load = 7452.1 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 862 -45267 6 0 0
2 45267 -862 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line 1 & 5 - Tile
10/6/2011 Page 1
350
CC 05-03-2022
350 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line A
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 97 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 8.5 25 6
2 9.5 49 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 1075.6 plf
Shear Wall Load = 5796.1 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 26889 -13235 6 0 0
2 3436 -41409 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line A - Tile
10/6/2011 Page 1
351
CC 05-03-2022
351 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line F
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 97 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 13 25 6
2 7 89 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 1075.6 plf
Shear Wall Load = 5216.5 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 26889 -26943 6 0 0
2 27911 -1076 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line F - Tile
10/6/2011 Page 1
352
CC 05-03-2022
352 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 7 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 5.63 3.5
Horizontal Bars 4 (3-9) 2 6.3 3.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 52.16 12
Right End Bar Size 8 (3-10) 2 1.3 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 74.8 kips φVn = 107.6 kips OK DCR = 0.70
Bending Check: φ = 0.88
Mu left = 887.2 ft-kips φMn = 364.1 ft-kips Overstressed! DCR = 2.44 Mu right = 887.2 ft-kips φMn = 364.1 ft-kips Overstressed! DCR = 2.44 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 12.6 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.6 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.6 sq.in. Supplied Number Of Bars = 2 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SW1-2-1 - Tile
10/6/2011 Page 1
353
CC 05-03-2022
353 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 8.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 6.83 4.25
Horizontal Bars 4 (3-9) 2 7.7 4.25
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 47.12 12
Right End Bar Size 9 (3-10) 2 1.6 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 68.2 kips φVn = 120.1 kips OK DCR = 0.57
Bending Check: φ = 0.88
Mu left = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Mu right = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 15.3 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.7 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-1 - Tile
10/6/2011 Page 1
354
CC 05-03-2022
354 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 9.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 7.64 4.75
Horizontal Bars 4 (3-9) 2 8.6 4.75
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 10 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 57.21 12
Right End Bar Size 10 (3-10) 2 1.8 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 82.6 kips φVn = 134.2 kips OK DCR = 0.62
Bending Check: φ = 0.88
Mu left = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Mu right = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 17.1 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.8 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.3 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-2 - Tile
10/6/2011 Page 1
355
CC 05-03-2022
355 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 13 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 10.45 6.5
Horizontal Bars 4 (3-9) 2 11.7 6.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 77.32 12
Right End Bar Size 8 (3-10) 2 2.5 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 111.7 kips φVn = 183.7 kips OK DCR = 0.61
Bending Check: φ = 0.88
Mu left = 1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Mu right =1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SWF-2-1 - Tile
10/6/2011 Page 1
356
CC 05-03-2022
356 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 8.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 6.83 4.25
Horizontal Bars 4 (3-9) 2 7.7 4.25
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 47.12 12
Right End Bar Size 9 (3-10) 2 1.6 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 68.2 kips φVn = 120.1 kips OK DCR = 0.57
Bending Check: φ = 0.88
Mu left = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Mu right = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 15.3 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.7 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-1 - Tile
10/6/2011 Page 1
357
CC 05-03-2022
357 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 9.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 7.64 4.75
Horizontal Bars 4 (3-9) 2 8.6 4.75
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 10 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 57.21 12
Right End Bar Size 10 (3-10) 2 1.8 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 82.6 kips φVn = 134.2 kips OK DCR = 0.62
Bending Check: φ = 0.88
Mu left = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Mu right = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 17.1 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.8 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.3 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-2 - Tile
10/6/2011 Page 1
358
CC 05-03-2022
358 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 13 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 10.45 6.5
Horizontal Bars 4 (3-9) 2 11.7 6.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 77.32 12
Right End Bar Size 8 (3-10) 2 2.5 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 111.7 kips φVn = 183.7 kips OK DCR = 0.61
Bending Check: φ = 0.88
Mu left = 1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Mu right =1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SWF-2-1 - Tile
10/6/2011 Page 1
359
CC 05-03-2022
359 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 7 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 5.63 3.5
Horizontal Bars 4 (3-9) 2 6.3 3.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 27.01 12
Right End Bar Size 9 (3-10) 2 1.3 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 39.6 kips φVn = 107.6 kips OK DCR = 0.37
Bending Check: φ = 0.88
Mu left = 464.7 ft-kips φMn = 232.4 ft-kips Overstressed! DCR = 2.00 Mu right =464.7 ft-kips φMn = 232.4 ft-kips Overstressed! DCR = 2.00 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 12.6 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.6 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWF-2-2 - Tile
10/6/2011 Page 1
360
CC 05-03-2022
360 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.1.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 49 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 12 in. Distance measured from left end of wall, ft.

Unsupported Height 13 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 95.6 24.5
Horizontal Bars 5 (3-9) 2
Spacing 10 in. 3
Vertical Bars 6 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 6 1 225.3 13
Right End Bar Size 6 (3-10) 2 10.2 6.5
Number of Bars 6 3
Distance From End 12 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0015 Actual: 0.0031 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0026 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 10 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 329.7 kips φVn = 1347.4 kips OK DCR = 0.24
Bending Check: φ = 0.89
Mu left = 4193.3 ft-kips φMn = 4503.2 ft-kips OK DCR = 0.93 Mu right = 4193.3 ft-kips φMn = 4503.2 ft-kips OK DCR = 0.93 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW1-1-1 - Tile
10/6/2011 Page 1
361
CC 05-03-2022
361 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.1.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 25 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 12 in. Distance measured from left end of wall, ft.

Unsupported Height 13 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 48.8 12.5
Horizontal Bars 5 (3-9) 2
Spacing 10 in. 3
Vertical Bars 6 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 6 1 119.5 13
Right End Bar Size 6 (3-10) 2 10.2 6.5
Number of Bars 6 3
Distance From End 6 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0015 Actual: 0.0031 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0026 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 10 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 181.6 kips φVn = 687.4 kips OK DCR = 0.26
Bending Check: φ = 0.89
Mu left = 2267.7 ft-kips φMn = 2292.8 ft-kips OK DCR = 0.99 Mu right = 2267.7 ft-kips φMn = 2292.8 ft-kips OK DCR = 0.99 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW1-1-2 - Tile
10/6/2011 Page 1
362
CC 05-03-2022
362 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW5.1.5 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 5.67 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 18 in. Distance measured from left end of wall, ft.

Unsupported Height 5.75 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 18.9 2.835
Horizontal Bars 5 (3-9) 2
Spacing 12 in. 3
Vertical Bars 5 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain D S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 3 1 27.4 5.75
Right End Bar Size 6 (3-10) 2 4 2.875
Number of Bars 3 3
Distance From End 3 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0012 Actual: 0.0029 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0029 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 44.0 kips φVn = 243.4 kips OK DCR = 0.18
Bending Check: φ = 0.89
Mu left = 236.7 ft-kips φMn = 252.6 ft-kips OK DCR = 0.94 Mu right = 236.7 ft-kips φMn = 252.6 ft-kips OK DCR = 0.94 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW5-1-5 - Tile
10/6/2011 Page 1
363
CC 05-03-2022
363 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
60 in
12 in
15 in
3 inβ 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2006 IBC & ASCE 7-05
12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft L(0.3) L(0.3) L(0.3) L(0.3) L(0.135) L(0.15) L(0.192) L(0.15)D(0.2490) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 12.0 in, Total Height = 15.0 in, Top Flange Width = 60.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #2 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #3 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 1.50 in from Bottom, from 6.0 to 18.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #4 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 8.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #5 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.0830
Uniform Load on ALL spans : D = 0.0830 ksf, Tributary Width = 3.0 ft Load for Span Number 1
Uniform Load : L = 0.10 ksf, Tributary Width = 3.0 ft, (corridor LL) Load for Span Number 2
Uniform Load : L = 0.10 ksf, Extent = 8.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (assembly LL) Uniform Load : L = 0.10 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 3.0 ft, (coridor) Load for Span Number 3
Uniform Load : L = 0.10 ksf, Extent = 0.0 -->> 18.0 ft, Tributary Width = 3.0 ft, (assembly LL) Uniform Load : L = 0.0450 ksf, Extent = 18.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (office LL) Load for Span Number 4
Uniform Load : L = 0.050 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 3.0 ft, (office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (corridor LL) 364 CC 05-03-2022
364 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load for Span Number 5
Uniform Load : L = 0.050 ksf, Tributary Width = 3.0 ft, (office LL) .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.882: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (LL*L*) Span # where maximum occurs Span # 2
Location of maximum on span 0.000ft
Mn * Phi : Allowable 57.522 k-ft
Typical SectionSection used for this span
Mu : Applied -50.717k-ft
Maximum Deflection
4357
1869
Ratio = 6972
Max Downward L+Lr+S Deflection 0.111in 2595Ratio =
Max Upward L+Lr+S Deflection -0.066in Ratio =
Max Downward Total Deflection 0.154in Ratio =
Max Upward Total Deflection -0.041in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 11.528 5.442 13.998 15.052 11.326 4.012 D Only 6.762 2.359 5.819 6.762 5.819 2.359 L Only, LL Comb Run (****L) 2.347 0.004 0.103 -0.026 -0.388 1.559 L Only, LL Comb Run (***L*) 2.264 -0.014 -0.325 0.081 2.123 -0.194 L Only, LL Comb Run (***LL) 4.611 -0.009 -0.222 0.056 1.736 1.365 L Only, LL Comb Run (**L**) -0.501 0.090 3.950 -0.539 3.126 0.083 L Only, LL Comb Run (**L*L) 1.846 0.094 4.054 -0.564 2.738 1.642 L Only, LL Comb Run (**LL*) 1.763 0.076 3.625 -0.457 5.249 -0.110 L Only, LL Comb Run (**LLL) 4.110 0.081 3.728 -0.483 4.861 1.449 L Only, LL Comb Run (*L***) 0.155 -0.353 4.125 3.919 -0.620 -0.026 L Only, LL Comb Run (*L**L) 2.502 -0.349 4.229 3.893 -1.008 1.533 L Only, LL Comb Run (*L*L*) 2.419 -0.367 3.800 4.000 1.503 -0.219 L Only, LL Comb Run (*L*LL) 4.766 -0.362 3.903 3.974 1.116 1.339 L Only, LL Comb Run (*LL**) -0.346 -0.263 8.076 3.380 2.505 0.058 L Only, LL Comb Run (*LL*L) 2.001 -0.259 8.179 3.354 2.118 1.616 L Only, LL Comb Run (*LLL*) 1.918 -0.277 7.750 3.461 4.629 -0.136 L Only, LL Comb Run (*LLLL) 4.265 -0.273 7.854 3.436 4.241 1.423 L Only, LL Comb Run (L****) -0.052 3.118 -0.775 4.694 0.207 0.009 L Only, LL Comb Run (L***L) 2.295 3.122 -0.672 4.668 -0.181 1.567 L Only, LL Comb Run (L**L*) 2.212 3.104 -1.101 4.775 2.330 -0.185 L Only, LL Comb Run (L**LL) 4.559 3.108 -0.997 4.749 1.943 1.374 L Only, LL Comb Run (L*L**) -0.552 3.207 3.175 4.155 3.332 0.092 L Only, LL Comb Run (L*L*L) 1.795 3.212 3.279 4.129 2.945 1.651 L Only, LL Comb Run (L*LL*) 1.712 3.194 2.850 4.237 5.456 -0.102 L Only, LL Comb Run (L*LLL) 4.058 3.198 2.953 4.211 5.068 1.457 L Only, LL Comb Run (LL***) 0.103 2.765 3.350 8.612 -0.413 -0.017 L Only, LL Comb Run (LL**L) 2.450 2.769 3.454 8.587 -0.801 1.542 L Only, LL Comb Run (LL*L*) 2.367 2.751 3.025 8.694 1.710 -0.211 L Only, LL Comb Run (LL*LL) 4.714 2.755 3.128 8.668 1.322 1.348 L Only, LL Comb Run (LLL**) -0.397 2.854 7.301 8.074 2.712 0.066 L Only, LL Comb Run (LLL*L) 1.950 2.859 7.404 8.048 2.325 1.625 L Only, LL Comb Run (LLLL*) 1.867 2.841 6.975 8.155 4.836 -0.127 L Only, LL Comb Run (LLLLL) 4.213 2.845 7.079 8.129 4.448 1.431 D+L, LL Comb Run (****L) 9.109 2.363 5.922 6.736 5.431 3.918 D+L, LL Comb Run (***L*) 9.026 2.345 5.493 6.844 7.942 2.165 D+L, LL Comb Run (***LL) 11.373 2.350 5.597 6.818 7.555 3.724 D+L, LL Comb Run (**L**) 6.262 2.449 9.769 6.224 8.944 2.442 D+L, LL Comb Run (**L*L) 8.609 2.453 9.872 6.198 8.557 4.001 D+L, LL Comb Run (**LL*) 8.526 2.435 9.444 6.305 11.068 2.249 D+L, LL Comb Run (**LLL) 10.872 2.439 9.547 6.279 10.680 3.808 D+L, LL Comb Run (*L***) 6.917 2.006 9.944 10.681 5.199 2.333 D+L, LL Comb Run (*L**L) 9.264 2.010 10.047 10.655 4.811 3.892 D+L, LL Comb Run (*L*L*) 9.181 1.992 9.619 10.762 7.322 2.140 D+L, LL Comb Run (*L*LL) 11.528 1.997 9.722 10.736 6.934 3.698 D+L, LL Comb Run (*LL**) 6.417 2.096 13.894 10.142 8.324 2.417 D+L, LL Comb Run (*LL*L) 8.764 2.100 13.998 10.117 7.937 3.975 D+L, LL Comb Run (*LLL*) 8.681 2.082 13.569 10.224 10.448 2.223 D+L, LL Comb Run (*LLLL) 11.027 2.086 13.672 10.198 10.060 3.782 D+L, LL Comb Run (L****) 6.701 5.390 4.904 11.653 6.063 2.369 D+L, LL Comb Run (L***L) 9.048 5.392 5.004 11.632 5.676 3.928 D+L, LL Comb Run (L**L*) 8.966 5.382 4.588 11.722 8.184 2.175 D+L, LL Comb Run (L**LL) 11.312 5.384 4.688 11.700 7.797 3.734 365 CC 05-03-2022
365 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 D+L, LL Comb Run (L*L**) 6.196 5.439 8.790 11.206 9.206 2.453 D+L, LL Comb Run (L*L*L) 8.543 5.442 8.890 11.185 8.819 4.012 D+L, LL Comb Run (L*LL*) 8.461 5.432 8.474 11.273 11.326 2.260 D+L, LL Comb Run (L*LLL) 10.808 5.434 8.574 11.252 10.940 3.818 D+L, LL Comb Run (LL***) 6.882 5.290 9.425 15.003 5.342 2.339 D+L, LL Comb Run (LL**L) 9.228 5.289 9.521 14.987 4.956 3.898 D+L, LL Comb Run (LL*L*) 9.147 5.290 9.122 15.052 7.460 2.145 D+L, LL Comb Run (LL*LL) 11.493 5.290 9.218 15.037 7.074 3.704 D+L, LL Comb Run (LLL**) 6.371 5.279 13.218 14.691 8.507 2.424 D+L, LL Comb Run (LLL*L) 8.717 5.278 13.314 14.676 8.122 3.983 D+L, LL Comb Run (LLLL*) 8.636 5.281 12.917 14.737 10.625 2.230 D+L, LL Comb Run (LLLLL) 10.983 5.280 13.012 14.723 10.239 3.789 .Shear Stirrup Requirements
Between 0.00 to 19.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 20.40 to 27.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 27.60 to 45.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 45.60 to 50.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 51.00 to 70.20 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 70.80 to 71.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 72.00 to 95.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 96.00 to 96.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 97.20 to 119.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -43.98 57.52 0.76
Span # 2 2 24.000 -50.72 57.52 0.88
Span # 3 3 48.000 -42.92 57.52 0.75
Span # 4 4 72.000 -35.54 57.52 0.62
Span # 5 5 96.000 -35.80 57.52 0.62
+1.40D
Span # 1 1 23.400 -18.16 57.52 0.32
Span # 2 2 24.000 -21.14 57.52 0.37
Span # 3 3 48.000 -15.85 57.52 0.28
Span # 4 4 95.400 -18.56 57.52 0.32
Span # 5 5 96.000 -21.14 57.52 0.37
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.40 57.52 0.27
Span # 2 2 24.000 -17.95 57.52 0.31
Span # 3 3 48.000 -14.25 57.52 0.25
Span # 4 4 95.400 -24.87 57.52 0.43
Span # 5 5 96.000 -27.38 57.52 0.48
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.07 57.52 0.28
Span # 2 2 24.000 -18.64 57.52 0.32
Span # 3 3 71.400 -19.05 57.52 0.33
Span # 4 4 84.000 16.39 35.90 0.46
Span # 5 5 96.000 -25.55 57.52 0.44
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.91 57.52 0.28
Span # 2 2 24.000 -18.47 57.52 0.32
Span # 3 3 71.400 -16.65 57.52 0.29
Span # 4 4 95.400 -30.37 57.52 0.53
Span # 5 5 96.000 -34.81 57.52 0.61
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.77 35.90 0.24
Span # 2 2 47.400 -24.96 57.52 0.43
Span # 3 3 48.000 -27.37 57.52 0.48
Span # 4 4 72.000 -26.40 57.52 0.46
Span # 5 5 96.000 -14.91 57.52 0.26
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.80 35.90 0.25
Span # 2 2 47.400 -25.60 57.52 0.45
Span # 3 3 48.000 -28.04 57.52 0.49
Span # 4 4 72.000 -23.92 57.52 0.42 366 CC 05-03-2022
366 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 2 2 24.000 -27.01 57.52 0.47
Span # 3 3 48.000 -21.20 57.52 0.37
Span # 4 4 95.400 -18.01 57.52 0.31
Span # 5 5 96.000 -20.22 57.52 0.35
+1.20D+0.50L+0.20S+E, LL Comb Run (
Span # 1 1 23.400 -23.40 57.52 0.41
Span # 2 2 24.000 -27.23 57.52 0.47
Span # 3 3 48.000 -20.35 57.52 0.35
Span # 4 4 72.000 -19.21 57.52 0.33
Span # 5 5 96.000 -19.65 57.52 0.34
+1.20D+0.50L+0.20S+E, LL Comb Run (
Span # 1 1 23.400 -23.35 57.52 0.41
Span # 2 2 24.000 -27.18 57.52 0.47
Span # 3 3 48.000 -20.55 57.52 0.36
Span # 4 4 95.400 -19.73 57.52 0.34
Span # 5 5 96.000 -22.54 57.52 0.39
+0.90D+1.60W+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
+0.90D+E+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 1 0.1540 10.800 -0.0109 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 2 0.0641 13.200 -0.0280 3.600 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 3 0.0787 10.800 -0.0060 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 4 0.0427 10.800 -0.0149 20.400 D+L, LL Comb Run (L*L*L) 5 0.0843 13.200 0.0000 20.400 367
CC 05-03-2022
367 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
60 in
12 in
15 in
3 inβ 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2006 IBC & ASCE 7-05
12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft D(0.2490) L(0.30)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 12.0 in, Total Height = 15.0 in, Top Flange Width = 60.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #2 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #3 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 1.50 in from Bottom, from 6.0 to 18.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #4 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 8.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #5 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.0830, L = 0.10
Uniform Load on ALL spans : D = 0.0830, L = 0.10 ksf, Tributary Width = 3.0 ft .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.890: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*L*LL) Span # where maximum occurs Span # 5
Location of maximum on span 0.000ft
Mn * Phi : Allowable 57.522 k-ft
Typical SectionSection used for this span
Mu : Applied -51.188k-ft
Maximum Deflection
4301
1846
Ratio = 6573
Max Downward L+Lr+S Deflection 0.113in 2549Ratio =
Max Upward L+Lr+S Deflection -0.067in Ratio =
Max Downward Total Deflection 0.156in Ratio =
Max Upward Total Deflection -0.044in
.368
CC 05-03-2022
368 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 15.107 5.448 14.275 15.098 14.275 5.448 D Only 6.762 2.359 5.819 6.762 5.819 2.359 L Only, LL Comb Run (****L) 4.694 0.009 0.207 -0.052 -0.775 3.118 L Only, LL Comb Run (***L*) 3.919 -0.026 -0.620 0.155 4.125 -0.353 L Only, LL Comb Run (***LL) 8.612 -0.017 -0.413 0.103 3.350 2.765 L Only, LL Comb Run (**L**) -0.568 0.095 4.074 -0.568 4.074 0.095 L Only, LL Comb Run (**L*L) 4.125 0.103 4.280 -0.620 3.299 3.212 L Only, LL Comb Run (**LL*) 3.350 0.069 3.454 -0.413 8.199 -0.258 L Only, LL Comb Run (**LLL) 8.044 0.078 3.660 -0.465 7.424 2.859 L Only, LL Comb Run (*L***) 0.155 -0.353 4.125 3.919 -0.620 -0.026 L Only, LL Comb Run (*L**L) 4.849 -0.344 4.332 3.867 -1.395 3.092 L Only, LL Comb Run (*L*L*) 4.074 -0.379 3.505 4.074 3.505 -0.379 L Only, LL Comb Run (*L*LL) 8.767 -0.370 3.712 4.022 2.730 2.739 L Only, LL Comb Run (*LL**) -0.413 -0.258 8.199 3.350 3.454 0.069 L Only, LL Comb Run (*LL*L) 4.280 -0.250 8.406 3.299 2.678 3.187 L Only, LL Comb Run (*LLL*) 3.505 -0.284 7.579 3.505 7.579 -0.284 L Only, LL Comb Run (*LLLL) 8.199 -0.276 7.786 3.454 6.804 2.833 L Only, LL Comb Run (L****) -0.052 3.118 -0.775 4.694 0.207 0.009 L Only, LL Comb Run (L***L) 4.642 3.126 -0.568 4.642 -0.568 3.126 L Only, LL Comb Run (L**L*) 3.867 3.092 -1.395 4.849 4.332 -0.344 L Only, LL Comb Run (L**LL) 8.561 3.100 -1.189 4.797 3.557 2.773 L Only, LL Comb Run (L*L**) -0.620 3.212 3.299 4.125 4.280 0.103 L Only, LL Comb Run (L*L*L) 4.074 3.221 3.505 4.074 3.505 3.221 L Only, LL Comb Run (L*LL*) 3.299 3.187 2.678 4.280 8.406 -0.250 L Only, LL Comb Run (L*LLL) 7.992 3.195 2.885 4.229 7.631 2.868 L Only, LL Comb Run (LL***) 0.103 2.765 3.350 8.612 -0.413 -0.017 L Only, LL Comb Run (LL**L) 4.797 2.773 3.557 8.561 -1.189 3.100 L Only, LL Comb Run (LL*L*) 4.022 2.739 2.730 8.767 3.712 -0.370 L Only, LL Comb Run (LL*LL) 8.716 2.747 2.937 8.716 2.937 2.747 L Only, LL Comb Run (LLL**) -0.465 2.859 7.424 8.044 3.660 0.078 L Only, LL Comb Run (LLL*L) 4.229 2.868 7.631 7.992 2.885 3.195 L Only, LL Comb Run (LLLL*) 3.454 2.833 6.804 8.199 7.786 -0.276 L Only, LL Comb Run (LLLLL) 8.147 2.842 7.011 8.147 7.011 2.842 D+L, LL Comb Run (****L) 11.653 2.369 6.063 6.701 4.904 5.390 D+L, LL Comb Run (***L*) 10.681 2.333 5.199 6.917 9.944 2.006 D+L, LL Comb Run (***LL) 15.013 2.339 5.343 6.881 9.419 5.285 D+L, LL Comb Run (**L**) 6.194 2.454 9.892 6.194 9.892 2.454 D+L, LL Comb Run (**L*L) 11.181 2.465 10.155 6.128 8.909 5.442 D+L, LL Comb Run (**LL*) 10.113 2.428 9.272 6.349 14.018 2.101 D+L, LL Comb Run (**LLL) 14.684 2.436 9.459 6.302 13.325 5.273 D+L, LL Comb Run (*L***) 6.917 2.006 9.944 10.681 5.199 2.333 D+L, LL Comb Run (*L**L) 11.784 2.016 10.183 10.621 4.301 5.375 D+L, LL Comb Run (*L*L*) 10.836 1.980 9.324 10.836 9.324 1.980 D+L, LL Comb Run (*L*LL) 15.107 1.986 9.457 10.803 8.841 5.286 D+L, LL Comb Run (*LL**) 6.349 2.101 14.018 10.113 9.272 2.428 D+L, LL Comb Run (*LL*L) 11.309 2.111 14.275 10.048 8.308 5.428 D+L, LL Comb Run (*LLL*) 10.268 2.075 13.398 10.268 13.398 2.075 D+L, LL Comb Run (*LLLL) 14.774 2.082 13.573 10.224 12.751 5.276 D+L, LL Comb Run (L****) 6.701 5.390 4.904 11.653 6.063 2.369 D+L, LL Comb Run (L***L) 11.601 5.396 5.143 11.601 5.143 5.396 D+L, LL Comb Run (L**L*) 10.621 5.375 4.301 11.784 10.183 2.016 D+L, LL Comb Run (L**LL) 14.974 5.377 4.443 11.755 9.645 5.285 D+L, LL Comb Run (L*L**) 6.128 5.442 8.909 11.181 10.155 2.465 D+L, LL Comb Run (L*L*L) 11.125 5.448 9.166 11.125 9.166 5.448 D+L, LL Comb Run (L*LL*) 10.048 5.428 8.308 11.309 14.275 2.111 D+L, LL Comb Run (L*LLL) 14.642 5.432 8.493 11.270 13.569 5.274 D+L, LL Comb Run (LL***) 6.882 5.290 9.425 15.003 5.342 2.339 D+L, LL Comb Run (LL**L) 11.755 5.290 9.651 14.964 4.442 5.377 D+L, LL Comb Run (LL*L*) 10.803 5.290 8.846 15.098 9.457 1.986 D+L, LL Comb Run (LL*LL) 15.092 5.288 8.970 15.082 8.964 5.283 D+L, LL Comb Run (LLL**) 6.303 5.278 13.333 14.673 9.458 2.436 D+L, LL Comb Run (LLL*L) 11.271 5.279 13.576 14.631 8.491 5.432 D+L, LL Comb Run (LLLL*) 10.224 5.282 12.758 14.763 13.571 2.082 D+L, LL Comb Run (LLLLL) 14.751 5.279 12.922 14.740 12.914 5.274 369 CC 05-03-2022
369 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :
.Shear Stirrup Requirements
Between 0.00 to 19.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 20.40 to 27.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 27.60 to 45.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 45.60 to 51.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 51.60 to 68.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 69.00 to 74.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 75.00 to 92.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 93.00 to 99.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 100.20 to 119.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -44.44 57.52 0.77
Span # 2 2 24.000 -51.19 57.52 0.89
Span # 3 3 48.000 -44.34 57.52 0.77
Span # 4 4 95.400 -44.93 57.52 0.78
Span # 5 5 96.000 -51.19 57.52 0.89
+1.40D
Span # 1 1 23.400 -18.16 57.52 0.32
Span # 2 2 24.000 -21.14 57.52 0.37
Span # 3 3 48.000 -15.85 57.52 0.28
Span # 4 4 95.400 -18.56 57.52 0.32
Span # 5 5 96.000 -21.14 57.52 0.37
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.24 57.52 0.27
Span # 2 2 24.000 -17.79 57.52 0.31
Span # 3 3 48.000 -14.91 57.52 0.26
Span # 4 4 95.400 -33.84 57.52 0.59
Span # 5 5 ##.### 23.10 35.90 0.64
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.53 57.52 0.29
Span # 2 2 24.000 -19.11 57.52 0.33
Span # 3 3 71.400 -25.90 57.52 0.45
Span # 4 4 84.000 26.00 35.90 0.72
Span # 5 5 96.000 -31.68 57.52 0.55
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.21 57.52 0.28
Span # 2 2 24.000 -18.78 57.52 0.33
Span # 3 3 71.400 -21.10 57.52 0.37
Span # 4 4 95.400 -44.06 57.52 0.77
Span # 5 5 96.000 -50.20 57.52 0.87
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.80 35.90 0.25
Span # 2 2 47.400 -25.70 57.52 0.45
Span # 3 3 48.000 -28.14 57.52 0.49
Span # 4 4 72.000 -28.14 57.52 0.49
Span # 5 5 96.000 -14.48 57.52 0.25
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.85 35.90 0.25
Span # 2 2 47.400 -26.98 57.52 0.47
Span # 3 3 48.000 -29.46 57.52 0.51
Span # 4 4 95.400 -30.66 57.52 0.53
Span # 5 5 ##.### 23.65 35.90 0.66
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.65 35.90 0.24
Span # 2 2 47.400 -21.86 57.52 0.38
Span # 3 3 71.400 -37.08 57.52 0.64
Span # 4 4 72.000 -43.02 57.52 0.75
Span # 5 5 96.000 -28.04 57.52 0.49
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.70 35.90 0.24
Span # 2 2 47.400 -23.14 57.52 0.40
Span # 3 3 71.400 -32.28 57.52 0.56
Span # 4 4 95.400 -40.88 57.52 0.71
Span # 5 5 96.000 -46.56 57.52 0.81
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -28.79 57.52 0.50
Span # 2 2 36.000 26.00 35.90 0.72 370 CC 05-03-2022
370 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
+0.90D+1.60W+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
+0.90D+E+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 1 0.1560 10.800 -0.0112 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 2 0.0667 13.200 -0.0289 3.600 D+L, LL Comb Run (L*L*L) 3 0.0869 13.200 0.0000 3.600 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 4 0.0667 10.800 -0.0289 20.400 D+L, LL Comb Run (L*L*L) 5 0.1560 13.200 0.0000 20.400 371
CC 05-03-2022
371 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =60.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft L(0.504) L(0.768) L(0.768)
L(1.536) L(0.768) L(0.504) L(0.768) L(0.504)D(2.616)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Top, from 8.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span 2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 2-#8 at 3.0 in from Bottom, from 16.0 to 24.0 ft in this span Span #3 Reinforcing....
2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 1-#11 at 3.0 in from Top, from 16.0 to 24.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#11 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (Multiuse LL) Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 12.0 ft, (corridor LL) Load for Span Number 2
Uniform Load : L = 0.0640 ksf, Tributary Width = 24.0 ft, (corridor LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) .
372
CC 05-03-2022
372 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.542: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (LL*L) Span # where maximum occurs Span # 2
Location of maximum on span 0.000ft
Mn * Phi : Allowable 649.56k-ft
Typical SectionSection used for this span
Mu : Applied -352.01k-ft
Maximum Deflection
7683
4605
Ratio =32410
Max Downward L+Lr+S Deflection 0.032in 8907Ratio =
Max Upward L+Lr+S Deflection -0.037in Ratio =
Max Downward Total Deflection 0.063in Ratio =
Max Upward Total Deflection -0.009in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.978 38.150 96.809 111.577 106.834 D Only 24.665 24.665 58.299 71.753 71.753
L Only, LL Comb Run (***L) 13.220 -0.136 -3.271 0.818 19.898 L Only, LL Comb Run (**L*) -1.499 0.409 17.445 -2.453 16.627 L Only, LL Comb Run (**LL) 11.721 0.273 14.174 -1.635 36.525 L Only, LL Comb Run (*L**) 0.494 -1.810 21.065 20.078 -2.962 L Only, LL Comb Run (*L*L) 13.713 -1.947 17.794 20.895 16.935 L Only, LL Comb Run (*LL*) -1.005 -1.401 38.510 17.625 13.665 L Only, LL Comb Run (*LLL) 12.214 -1.538 35.239 18.442 33.562 L Only, LL Comb Run (L***) -0.145 13.441 -3.480 21.955 0.870 L Only, LL Comb Run (L**L) 13.075 13.304 -6.751 22.772 20.768 L Only, LL Comb Run (L*L*) -1.644 13.850 13.964 19.501 17.497 L Only, LL Comb Run (L*LL) 11.576 13.713 10.693 20.319 37.395 L Only, LL Comb Run (LL**) 0.349 11.630 17.585 42.032 -2.092 L Only, LL Comb Run (LL*L) 13.568 11.494 14.314 42.850 17.806 L Only, LL Comb Run (LLL*) -1.150 12.039 35.029 39.579 14.535 L Only, LL Comb Run (LLLL) 12.069 11.903 31.758 40.397 34.432 D+L, LL Comb Run (***L) 37.742 24.517 54.783 72.639 91.982 D+L, LL Comb Run (**L*) 23.166 25.074 75.744 69.300 88.380 D+L, LL Comb Run (**LL) 37.333 24.995 73.933 69.776 106.155 D+L, LL Comb Run (*L**) 25.159 22.855 79.365 91.831 68.791 D+L, LL Comb Run (*L*L) 37.956 22.712 75.451 92.768 89.640 D+L, LL Comb Run (*LL*) 23.660 23.264 96.809 89.378 85.418 D+L, LL Comb Run (*LLL) 37.332 23.153 94.223 90.040 104.307 D+L, LL Comb Run (L***) 24.510 38.005 54.631 93.947 72.681 D+L, LL Comb Run (L**L) 37.673 37.947 51.366 94.617 92.701 D+L, LL Comb Run (L*L*) 22.994 38.122 71.626 92.149 89.413 D+L, LL Comb Run (L*LL) 37.308 38.150 70.188 92.351 106.834 D+L, LL Comb Run (LL**) 25.091 37.585 77.866 110.898 69.199 D+L, LL Comb Run (LL*L) 37.978 37.550 74.239 111.577 89.824 D+L, LL Comb Run (LLL*) 23.567 37.593 94.685 109.348 85.976 D+L, LL Comb Run (LLLL) 37.387 37.622 92.523 109.663 104.501 .Shear Stirrup Requirements
Between 0.00 to 4.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 5.40 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 20.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 21.00 to 25.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 10.000 in Between 26.40 to 32.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 33.00 to 40.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 41.40 to 45.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 46.20 to 49.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 50.40 to 54.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 55.20 to 64.20 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 64.80 to 69.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 69.60 to 74.40 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 10.000 in Between 75.00 to 81.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 82.20 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -305.27 649.56 0.47
Span # 2 2 24.000 -352.01 649.56 0.54 373 CC 05-03-2022
373 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 72.000 -145.30 751.89 0.19
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*)D+L, LL Comb Run (L*L*) 1 0.0625 10.800 -0.0033 25.200 D+L, LL Comb Run (*L*L) 2 0.0291 13.200 0.0000 25.200 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 3 0.0261 10.800 -0.0078 20.400 D+L, LL Comb Run (*L*L) 4 0.0608 13.200 0.0000 20.400 374
CC 05-03-2022
374 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G2 (gridline C; fixed seating)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=32.0 ft 16" w x 36" hSpan=16.0 ft 16" w x 36" hSpan=24.0 ft L(1.008) L(1.536) L(1.44) L(1.536) L(1.008) L(1.008)D(2.616) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 15.750 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 6.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 21.750 ft in this span 2-#11 at 3.0 in from Top, from 17.10 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 15.0 ft in this span 2-#8 at 3.0 in from Top, from 17.10 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Bottom, from 1.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 10.0 to 16.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 9.250 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 9.250 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Load for Span Number 2
Uniform Load : L = 0.060 ksf, Tributary Width = 24.0 ft, (Assembly LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Uniform Load : L = 0.0420 ksf, Extent = 8.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Office LL) .
375
CC 05-03-2022
375 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G2 (gridline C; fixed seating)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.841: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*LL*) Span # where maximum occurs Span # 3
Location of maximum on span 0.000ft
Mn * Phi : Allowable 439.06k-ft
Typical SectionSection used for this span
Mu : Applied -369.18k-ft
Maximum Deflection
5289
2118
Ratio = 6791
Max Downward L+Lr+S Deflection 0.120in 3204Ratio =
Max Upward L+Lr+S Deflection -0.073in Ratio =
Max Downward Total Deflection 0.181in Ratio =
Max Upward Total Deflection -0.028in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.310 34.529 108.545 124.971 82.567 D Only 26.609 22.211 63.586 84.361 54.369
L Only, LL Comb Run (***L) 10.212 -0.099 -3.681 0.434 17.326 L Only, LL Comb Run (**L*) -0.553 0.154 11.731 -0.674 9.694 L Only, LL Comb Run (**LL) 9.659 0.055 8.050 -0.240 27.020 L Only, LL Comb Run (*L**) 0.839 -3.190 31.350 25.474 -8.393 L Only, LL Comb Run (*L*L) 11.052 -3.289 27.669 25.908 8.933 L Only, LL Comb Run (*LL*) 0.286 -3.035 43.081 24.800 1.300 L Only, LL Comb Run (*LLL) 10.499 -3.135 39.400 25.234 18.626 L Only, LL Comb Run (L***) -0.115 11.130 -2.721 18.971 1.152 L Only, LL Comb Run (L**L) 10.097 11.031 -6.402 19.404 18.478 L Only, LL Comb Run (L*L*) -0.668 11.284 9.010 18.297 10.845 L Only, LL Comb Run (L*LL) 9.544 11.185 5.329 18.730 28.171 L Only, LL Comb Run (LL**) 0.724 7.940 28.628 44.445 -7.242 L Only, LL Comb Run (LL*L) 10.936 7.841 24.948 44.878 10.084 L Only, LL Comb Run (LLL*) 0.171 8.094 40.360 43.771 2.452 L Only, LL Comb Run (LLLL) 10.383 7.995 36.679 44.204 19.778 D+L, LL Comb Run (***L) 36.362 22.159 59.111 84.759 72.937 D+L, LL Comb Run (**L*) 26.051 22.294 75.204 83.829 64.110 D+L, LL Comb Run (**LL) 35.989 22.213 71.035 84.260 82.183 D+L, LL Comb Run (*L**) 27.860 19.060 98.305 108.859 43.131 D+L, LL Comb Run (*L*L) 37.310 18.992 94.061 109.053 61.991 D+L, LL Comb Run (*LL*) 27.166 19.140 108.545 108.723 53.993 D+L, LL Comb Run (*LLL) 36.883 19.095 105.038 108.770 71.975 D+L, LL Comb Run (L***) 26.564 34.487 62.618 101.063 54.820 D+L, LL Comb Run (L**L) 36.362 34.441 58.234 101.444 73.263 D+L, LL Comb Run (L*L*) 26.004 34.529 74.175 100.611 64.584 D+L, LL Comb Run (L*LL) 35.968 34.491 70.115 100.956 82.567 D+L, LL Comb Run (LL**) 27.765 31.840 97.656 124.675 43.696 D+L, LL Comb Run (LL*L) 37.249 31.741 93.294 124.971 62.569 D+L, LL Comb Run (LLL*) 27.113 31.974 108.401 124.310 54.186 D+L, LL Comb Run (LLLL) 36.858 31.909 104.758 124.446 72.205 .Shear Stirrup Requirements
Between 0.00 to 3.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 4.20 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 19.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.40 to 28.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 5.000 in Between 29.60 to 36.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 36.80 to 44.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 44.80 to 50.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 51.20 to 56.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 8.000 in Between 57.20 to 61.20 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 61.60 to 68.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 69.20 to 71.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 72.00 to 72.60 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 73.20 to 79.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 80.40 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -415.20 646.99 0.64
Span # 2 2 24.000 -463.37 576.91 0.80 376 CC 05-03-2022
376 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 85.800 121.61 474.11 0.26
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 1 0.0426 10.800 -0.0155 20.400 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 2 0.2161 17.600 -0.0085 32.800 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 3 0.0089 17.200 -0.0315 7.200 D+L, LL Comb Run (*L*L) 4 0.0744 13.200 0.0000 7.200 377
CC 05-03-2022
377 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=32.0 ft 16" w x 36" hSpan=16.0 ft 16" w x 36" hSpan=24.0 ft L(1.008) L(1.536) L(1.2) L(0.504) L(1.536) L(0.045) L(1.008)D(2.616) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 15.750 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 6.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 21.750 ft in this span 2-#11 at 3.0 in from Top, from 25.250 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 25.250 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Bottom, from 1.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#11 at 3.0 in from Bottom, from 11.0 to 16.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 9.250 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 9.250 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Load for Span Number 2
Uniform Load : L = 0.10 ksf, Tributary Width = 12.0 ft, (Assembly LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Uniform Load : L = 0.0450 k/ft, Extent = 8.0 -->> 16.0 ft, Tributary Width = 1.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Office LL) .
378
CC 05-03-2022
378 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.894: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*LL*) Span # where maximum occurs Span # 3
Location of maximum on span 0.000ft
Mn * Phi : Allowable 439.06k-ft
Typical SectionSection used for this span
Mu : Applied -392.60k-ft
Maximum Deflection
5354
1776
Ratio =6086
Max Downward L+Lr+S Deflection 0.155in 2481Ratio =
Max Upward L+Lr+S Deflection -0.072in Ratio =
Max Downward Total Deflection 0.216in Ratio =
Max Upward Total Deflection -0.032in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.528 34.517 112.925 129.909 76.522 D Only 26.609 22.211 63.586 84.361 54.369
L Only, LL Comb Run (***L) 10.212 -0.099 -3.681 0.434 17.326 L Only, LL Comb Run (**L*) -0.296 0.108 9.797 -0.474 3.513 L Only, LL Comb Run (**LL) 9.916 0.009 6.117 -0.041 20.839 L Only, LL Comb Run (*L**) 0.993 -3.774 37.097 30.144 -9.932 L Only, LL Comb Run (*L*L) 11.205 -3.873 33.416 30.578 7.394 L Only, LL Comb Run (*LL*) 0.697 -3.666 46.894 29.670 -6.420 L Only, LL Comb Run (*LLL) 10.909 -3.765 43.213 30.104 10.906 L Only, LL Comb Run (L***) -0.115 11.130 -2.721 18.971 1.152 L Only, LL Comb Run (L**L) 10.097 11.031 -6.402 19.404 18.478 L Only, LL Comb Run (L*L*) -0.411 11.238 7.076 18.496 4.664 L Only, LL Comb Run (L*LL) 9.801 11.139 3.395 18.930 21.990 L Only, LL Comb Run (LL**) 0.878 7.356 34.376 49.115 -8.780 L Only, LL Comb Run (LL*L) 11.090 7.257 30.695 49.549 8.546 L Only, LL Comb Run (LLL*) 0.582 7.464 44.173 48.640 -5.268 L Only, LL Comb Run (LLLL) 10.794 7.365 40.492 49.074 12.058 D+L, LL Comb Run (***L) 36.362 22.159 59.111 84.759 72.937 D+L, LL Comb Run (**L*) 26.309 22.263 73.294 83.999 57.918 D+L, LL Comb Run (**LL) 36.179 22.196 69.017 84.412 76.172 D+L, LL Comb Run (*L**) 28.113 18.191 103.990 114.026 41.343 D+L, LL Comb Run (*L*L) 37.528 18.140 99.805 114.157 60.226 D+L, LL Comb Run (*LL*) 27.703 18.258 112.925 113.845 45.582 D+L, LL Comb Run (*LLL) 37.240 18.228 109.103 113.884 64.048 D+L, LL Comb Run (L***) 26.564 34.487 62.618 101.063 54.820 D+L, LL Comb Run (L**L) 36.362 34.441 58.234 101.444 73.263 D+L, LL Comb Run (L*L*) 26.263 34.517 72.293 100.745 58.382 D+L, LL Comb Run (L*LL) 36.170 34.476 68.122 101.102 76.522 D+L, LL Comb Run (LL**) 28.037 30.957 103.781 129.726 41.580 D+L, LL Comb Run (LL*L) 37.470 30.883 99.567 129.909 60.443 D+L, LL Comb Run (LLL*) 27.638 31.029 112.628 129.570 45.862 D+L, LL Comb Run (LLLL) 37.225 30.985 108.922 129.618 64.170 .Shear Stirrup Requirements
Between 0.00 to 3.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 4.20 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 19.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.40 to 29.60 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 4.000 in Between 30.40 to 36.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 36.80 to 44.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 44.80 to 49.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 50.40 to 56.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 6.000 in Between 57.20 to 61.20 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 61.60 to 69.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 70.00 to 71.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 72.00 to 72.00 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 72.60 to 79.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 80.40 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -437.09 646.99 0.68
Span # 2 2 24.000 -485.82 576.91 0.84 379 CC 05-03-2022
379 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 85.800 121.61 474.11 0.26
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 1 0.0426 10.800 -0.0155 20.400 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 2 0.2161 17.600 -0.0085 32.800 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 3 0.0089 17.200 -0.0315 7.200 D+L, LL Comb Run (*L*L) 4 0.0744 13.200 0.0000 7.200 380
CC 05-03-2022
380 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft D(2.6)
L(0.768) L(0.504)
D(0.456)
L(0.768) L(1.008)
L(0.504)
L(1.008)D(2.40)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 3.0 in from Bottom, from 0.0 to 19.0 ft in this span 2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 18.0 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span 1-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 2-#11 at 3.0 in from Bottom, from 18.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 6.0 ft in this span 2-#11 at 3.0 in from Top, from 8.0 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 6.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.10
Uniform Load on ALL spans : D = 0.10 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) Uniform Load : D = 0.0380 ksf, Extent = 0.0 -->> 14.0 ft, Tributary Width = 12.0 ft, (addl slab DL) Point Load : D = 2.60 k @ 14.0 ft
Load for Span Number 2
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (office LL) Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (office LL) Load for Span Number 3
Uniform Load : L = 0.0420 ksf, Tributary Width = 24.0 ft, (office LL) .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.997: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*L*) Span # where maximum occurs Span # 2
Location of maximum on span 12.200ft
Mn * Phi : Allowable 118.80k-ft
Typical SectionSection used for this span
Mu : Applied 118.47k-ft
Maximum Deflection
6969
3572
Ratio =16621
Max Downward L+Lr+S Deflection 0.043in 6648Ratio =
Max Upward L+Lr+S Deflection -0.041in Ratio =
Max Downward Total Deflection 0.081in Ratio =
Max Upward Total Deflection -0.017in
.
381
CC 05-03-2022
381 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 40.666 92.137 103.500 34.360
D Only 27.966 62.342 68.266 23.210
L Only, LL Comb Run (**L) 0.403 15.725 -2.419 10.483 L Only, LL Comb Run (*L*) -1.470 14.870 16.434 -1.418 L Only, LL Comb Run (*LL) -1.067 30.595 14.015 9.065 L Only, LL Comb Run (L**) 13.229 -3.053 19.843 0.509 L Only, LL Comb Run (L*L) 13.632 12.672 17.424 10.992 L Only, LL Comb Run (LL*) 11.758 11.817 36.278 -0.909 L Only, LL Comb Run (LLL) 12.162 27.542 33.858 9.574 D+L, LL Comb Run (**L) 28.375 78.111 65.818 33.673 D+L, LL Comb Run (*L*) 26.550 77.292 84.579 21.778 D+L, LL Comb Run (*LL) 26.815 92.137 82.807 32.632 D+L, LL Comb Run (L**) 40.558 58.323 89.547 23.883 D+L, LL Comb Run (L*L) 40.666 73.764 87.714 34.360 D+L, LL Comb Run (LL*) 40.193 74.841 103.500 22.194 D+L, LL Comb Run (LLL) 40.274 89.845 101.926 32.876 .Shear Stirrup Requirements
Between 0.00 to 5.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 5.60 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.00 to 20.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.20 to 25.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 9.000 in Between 26.00 to 31.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 31.80 to 40.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 40.80 to 46.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 46.80 to 49.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 50.00 to 56.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 56.80 to 67.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 67.60 to 71.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -277.39 367.89 0.75
+1.40D
Span # 1 1 23.800 -205.60 367.89 0.56
Span # 2 2 47.800 -180.07 296.54 0.61
Span # 3 3 48.000 -187.83 367.89 0.51
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -160.88 367.89 0.44
Span # 2 2 47.800 -215.64 296.54 0.73
Span # 3 3 48.000 -222.93 367.89 0.61
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -232.22 367.89 0.63
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -215.46 367.89 0.59
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -216.87 367.89 0.59
Span # 2 2 47.800 -265.82 296.54 0.90
Span # 3 3 48.000 -277.39 367.89 0.75
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 10.000 274.14 399.60 0.69
Span # 2 2 24.000 -263.59 367.89 0.72
Span # 3 3 48.000 -141.46 367.89 0.38
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 10.200 280.63 399.60 0.70
Span # 2 2 24.000 -248.11 367.89 0.67
Span # 3 3 61.800 229.76 399.60 0.57
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 24.000 -320.05 367.89 0.87
Span # 3 3 48.000 -195.92 367.89 0.53
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -289.52 367.89 0.79
Span # 2 2 47.800 -247.10 296.54 0.83 382 CC 05-03-2022
382 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 3 3 48.000 -257.85 367.89 0.70
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -160.88 367.89 0.44
Span # 2 2 47.800 -215.64 296.54 0.73
Span # 3 3 48.000 -222.93 367.89 0.61
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -232.22 367.89 0.63
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -215.46 367.89 0.59
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -216.87 367.89 0.59
Span # 2 2 47.800 -265.82 296.54 0.90
Span # 3 3 48.000 -277.39 367.89 0.75
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 10.000 274.14 399.60 0.69
Span # 2 2 24.000 -263.59 367.89 0.72
Span # 3 3 48.000 -141.46 367.89 0.38
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 10.200 280.63 399.60 0.70
Span # 2 2 24.000 -248.11 367.89 0.67
Span # 3 3 61.800 229.76 399.60 0.57
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 24.000 -320.05 367.89 0.87
Span # 3 3 48.000 -195.92 367.89 0.53
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -289.52 367.89 0.79
Span # 2 2 47.800 -247.10 296.54 0.83
Span # 3 3 48.000 -257.85 367.89 0.70
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -171.43 367.89 0.47
Span # 2 2 47.800 -173.50 296.54 0.59
Span # 3 3 48.000 -180.35 367.89 0.49
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -193.73 367.89 0.53
Span # 2 2 47.800 -170.03 296.54 0.57
Span # 3 3 48.000 -178.02 367.89 0.48
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -188.93 367.89 0.51
Span # 2 2 47.800 -189.18 296.54 0.64
Span # 3 3 48.000 -197.37 367.89 0.54
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -198.93 367.89 0.54
Span # 2 2 24.000 -209.86 367.89 0.57
Span # 3 3 48.000 -154.89 367.89 0.42
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -194.14 367.89 0.53
Span # 2 2 47.800 -167.65 296.54 0.57
Span # 3 3 48.000 -174.25 367.89 0.47
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -216.43 367.89 0.59
Span # 2 2 24.000 -227.51 367.89 0.62
Span # 3 3 48.000 -171.91 367.89 0.47
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -211.63 367.89 0.58
Span # 2 2 47.800 -183.33 296.54 0.62
Span # 3 3 48.000 -191.27 367.89 0.52
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L)D+L, LL Comb Run (L*L) 1 0.0806 10.200 -0.0029 24.600 D+L, LL Comb Run (L*L)D+L, LL Comb Run (L*L) 2 0.0027 24.600 -0.0173 9.000 D+L, LL Comb Run (L*L) 3 0.0519 12.600 0.0000 9.000 383
CC 05-03-2022
383 of 1033
Concrete Slender Wall ENERCALC, INC. 1983-2011, Build:6.11.9.30, Ver:6.11.8.1 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 5 OCT 2011, 12:38PM
Description : Existing 6" wall
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

General Information
Min Allow Out-of-Plane Defl Ratio = L / 150.0Rebar at wall center =Minimum Vertical Steel % 0.0020
Wall Thickness 6.0in
Bar Size 4#
Bar Spacing 12.0in
=Width of Design Strip 12.0in

1.0λ
Rebar "d" distance in3.0
Lower Level Rebar . . .

Temp Diff across thickness deg F=3.50ksi

40.0ksi
Fr : Rupture Modulus 295.80psi
ρ
3,372.17ksi
Max % of balanced 0.60
144.0pcf=
=Max Pu/Ag = f'c *
=

0.060
Using Stiffness Reduction Factor per ACI R.10.12.3=: Lt Wt Conc Factor Calculations per ACI 318-08 Sec 14.8, IBC 2009, CBC 2010, ASCE 7-05 =
Ec : Concrete Elastic Modulus
=
=
Concrete Density
=f'c : Concrete 28 day strength
Fy : Rebar Yield
One-Story Wall Dimensions

12.0 B
Roof Attachment
A
Floor Attachment
B Parapet height ft=
=Clear Height
Top & Bottom Pinned
A ft
Wall Support Condition
Vertical Loads

0.880 0.2560
Vertical Uniform Loads . . . ( Applied per foot of Strip Width) Ledger Load
Concentric Load
DL : Dead Load
k/ft
k/ft
Lr : Roof Live Load Lf : Floor Live Load S : Snow Load
Eccentricity in
Lateral Loads

15.0 Fp 1.0 = 34.0psf
Full area WIND load
psf Wall Weight Seismic Load Input Method : Direct entry of Lateral Wall Weight Seismic Wall Lateral Load 34.0psf

DESIGN SUMMARY
Actual Values . . . Allowable Values . . .Governing Load Combination . . .

Axial Load Check
+1.40D at 5.20 to 5.60
Max Pu / Ag 26.631psi 0.06 * f'c 210.0psi
Reinforcing Limit Check As/bd =0.005556Controlling As/bd +1.40D

0.02598
Service Deflection Check
D + L + S + E/1.4
Min. Defl. Ratio Max Allow Ratio9,242.33 150.0PASS
FAIL
PASS
Max. Deflection 0.01558in Max. Allow. Defl. 0.960in
PASS
Moment Capacity Check
+1.050D+1.280Lr+1.40E Max Mu 0.8592k-ft Phi * Mn 2.046k-ft Maximum Bending Stress Ratio = 0.420PASS
Minimum Moment Check
+1.40D
k-ft
Top Horizontal E Only
Base Horizontal
E Only 0.2040k
rho bal
Maximum Reactions . . . for Load Combination....

Results reported for "Strip Width" of 12.0 in

0.2040k

0.50 Vertical Reaction
D + L + Lr 2.0k
Mcracking 1.7331.775 Minimum Phi Mn k-ft
384
CC 05-03-2022
384 of 1033
Concrete Slender Wall ENERCALC, INC. 1983-2011, Build:6.11.9.30, Ver:6.11.8.1 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 5 OCT 2011, 12:38PM
Description : Existing 6" wall
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Moment Values 0.6 *
Design Maximum Combinations - Moments

0.06*f'c*b*t
Axial Load
Load Combination Phi MnMu
k
Pu Mcr As RatioAs EffAs rho bal
in^2k-ft in^2k k-ftk-ft
Phi

0.0056 0.248 0.00

2.08 15.120 0.200 0.0260 1.917 0.88 1.77+1.40D at 5.20 to 5.60

0.0056 0.243 0.86 2.05 15.120 0.200 0.0260 1.736 0.88 1.77+1.050D+1.280Lr+1.40E at 5.60 to 6.00

0.0056 0.230 0.67 1.96 15.120 0.200 0.0260 1.207 0.89 1.77+0.90D+1.10E at 5.60 to 6.00 Moment Values DeflectionsStiffness
Design Maximum Combinations - Deflections
Axial Load
Load Combination I crackedMactualPu Mcr Defl. Ratio
in^4k-ft k-ft in^4 in^4 ink
DeflectionI effectiveI gross

0.0 0.000 0.00

13.02 1.597 216.000 216.00 1.77D + L + Lr at 5.60 to 6.00 14,963.8 0.010 0.27 12.73 1.341 216.000 216.00 1.77D + L + W at 5.60 to 6.00 14,963.8 0.010 0.27 12.73 1.341 216.000 216.00 1.77D + L + W + S/2 at 5.60 to 6.00 29,927.6 0.005 0.14 12.73 1.341 216.000 216.00 1.77D + L + S + W/2 at 5.60 to 6.00 9,242.3 0.016 0.44 12.73 1.341 216.000 216.00 1.77D + L + S + E/1.4 at 5.60 to 6.00 21,368.9 0.007 0.19 12.88 1.469 216.000 216.00 1.77D + 0.5(L+Lr) + 0.7W at 5.60 to 6.00 9,427.5 0.015 0.43 12.88 1.469 216.000 216.00 1.77D + 0.5(L+Lr)+ 0.7E at 5.60 to 6.00 Top Horizontal Vertical @ Wall Base
Reactions - Vertical & Horizontal
Base HorizontalLoad Combination
D Only 0.0 0.00

1.744k k k
S Only 0.0 0.00 0.000k k k
W Only 0.1 0.09 0.000k k k
E Only 0.2 0.20 0.000k k k
D + L + Lr 0.0 0.00 2.000k k k
D + L + S 0.0 0.00 1.744k k k
D + L + W + S/2 0.1 0.09 1.744k k k
D + L + S + W/2 0.0 0.05 1.744k k k
D + L + S + E/1.4 0.1 0.15 1.744k k k
385
CC 05-03-2022
385 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line 1 & 5
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 121 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 7 1 6
2 7 113 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 862.2 plf
Shear Wall Load = 7452.1 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 862 -45267 6 0 0
2 45267 -862 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line 1 & 5 - Tile
10/6/2011 Page 1
386
CC 05-03-2022
386 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line A
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 97 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 8.5 25 6
2 9.5 49 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 1075.6 plf
Shear Wall Load = 5796.1 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 26889 -13235 6 0 0
2 3436 -41409 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line A - Tile
10/6/2011 Page 1
387
CC 05-03-2022
387 of 1033
Program: PL-02 COLLECTOR STRESS ANALYSIS
Designation: Wall Line F
Input Data:

Total Lateral Load: 104330 lbs.

Overall Collector Length: 97 ft.

Wall No. Length (ft) Begin (ft.)* Wall No. Length (ft) Begin (ft.)* 1 13 25 6
2 7 89 7
3 8
4 9
5 10
* Begin location is distance from left end of overall collector length to left end of shear wall.

Collector Load = 1075.6 plf
Shear Wall Load = 5216.5 plf
Collector Loads:

Wall No. Begin (lbs.) End (lbs.) Wall No.Begin (lbs.)End (lbs.) 1 26889 -26943 6 0 0
2 27911 -1076 7 0 0
3 0 0 8 0 0
4 0 0 9 0 0
5 0 0 10 0 0
Program PL-02: Collector Stress - Line F - Tile
10/6/2011 Page 1
388
CC 05-03-2022
388 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 7 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 5.63 3.5
Horizontal Bars 4 (3-9) 2 6.3 3.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 52.16 12
Right End Bar Size 8 (3-10) 2 1.3 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 74.8 kips φVn = 107.6 kips OK DCR = 0.70
Bending Check: φ = 0.88
Mu left = 887.2 ft-kips φMn = 364.1 ft-kips Overstressed! DCR = 2.44 Mu right = 887.2 ft-kips φMn = 364.1 ft-kips Overstressed! DCR = 2.44 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 12.6 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.6 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.6 sq.in. Supplied Number Of Bars = 2 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SW1-2-1 - Tile
10/6/2011 Page 1
389
CC 05-03-2022
389 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 8.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 6.83 4.25
Horizontal Bars 4 (3-9) 2 7.7 4.25
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 47.12 12
Right End Bar Size 9 (3-10) 2 1.6 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 68.2 kips φVn = 120.1 kips OK DCR = 0.57
Bending Check: φ = 0.88
Mu left = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Mu right = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 15.3 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.7 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-1 - Tile
10/6/2011 Page 1
390
CC 05-03-2022
390 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 9.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 7.64 4.75
Horizontal Bars 4 (3-9) 2 8.6 4.75
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 10 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 57.21 12
Right End Bar Size 10 (3-10) 2 1.8 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 82.6 kips φVn = 134.2 kips OK DCR = 0.62
Bending Check: φ = 0.88
Mu left = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Mu right = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 17.1 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.8 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.3 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-2 - Tile
10/6/2011 Page 1
391
CC 05-03-2022
391 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 13 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 10.45 6.5
Horizontal Bars 4 (3-9) 2 11.7 6.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 77.32 12
Right End Bar Size 8 (3-10) 2 2.5 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 111.7 kips φVn = 183.7 kips OK DCR = 0.61
Bending Check: φ = 0.88
Mu left = 1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Mu right =1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SWF-2-1 - Tile
10/6/2011 Page 1
392
CC 05-03-2022
392 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 8.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 6.83 4.25
Horizontal Bars 4 (3-9) 2 7.7 4.25
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 47.12 12
Right End Bar Size 9 (3-10) 2 1.6 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 68.2 kips φVn = 120.1 kips OK DCR = 0.57
Bending Check: φ = 0.88
Mu left = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Mu right = 805.1 ft-kips φMn = 285.4 ft-kips Overstressed! DCR = 2.82 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 15.3 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.7 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-1 - Tile
10/6/2011 Page 1
393
CC 05-03-2022
393 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWA.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 9.5 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 7.64 4.75
Horizontal Bars 4 (3-9) 2 8.6 4.75
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 10 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 57.21 12
Right End Bar Size 10 (3-10) 2 1.8 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 82.6 kips φVn = 134.2 kips OK DCR = 0.62
Bending Check: φ = 0.88
Mu left = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Mu right = 976.2 ft-kips φMn = 406.2 ft-kips Overstressed! DCR = 2.40 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 17.1 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.8 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.3 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWA-2-2 - Tile
10/6/2011 Page 1
394
CC 05-03-2022
394 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 13 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 10.45 6.5
Horizontal Bars 4 (3-9) 2 11.7 6.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 8 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 2 1 77.32 12
Right End Bar Size 8 (3-10) 2 2.5 6
Number of Bars 2 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 111.7 kips φVn = 183.7 kips OK DCR = 0.61
Bending Check: φ = 0.88
Mu left = 1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Mu right =1320.0 ft-kips φMn = 699.2 ft-kips Overstressed! DCR = 1.89 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SWF-2-1 - Tile
10/6/2011 Page 1
395
CC 05-03-2022
395 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SWF.2.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 7 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 6 in. Distance measured from left end of wall, ft.

Unsupported Height 12 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 5.63 3.5
Horizontal Bars 4 (3-9) 2 6.3 3.5
Spacing 12 in. 3
Vertical Bars 4 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 9 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 1 1 27.01 12
Right End Bar Size 9 (3-10) 2 1.3 6
Number of Bars 1 3
Distance From End 4 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0025 Actual: 0.0028 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Single Reinforcing Curtain Allowed Hooked Shear Reinforcing Check: Hooked Shear Reinforcing IS Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 39.6 kips φVn = 107.6 kips OK DCR = 0.37
Bending Check: φ = 0.88
Mu left = 464.7 ft-kips φMn = 232.4 ft-kips Overstressed! DCR = 2.00 Mu right =464.7 ft-kips φMn = 232.4 ft-kips Overstressed! DCR = 2.00 Boundary Member Check:

Boundary Member Required: YES
Minimum Boundary Member Length = 12.6 in.

Minimum Boundary Member Thickness = 9.0 in.

Minimum Boundary Member Steel = 0.6 sq.in. Minimum Number Of Bars = 4 Actual Boundary Member Steel = 1.0 sq.in. Supplied Number Of Bars = 1 Maximum Tie Spacing = 0.0 in.

Length/Width Ratio Of Hoop Ties Shall Not Exceed 3
Cross Ties Or Hoops Shall Be Spaced 12 in. o.c. Maximum Alternate Vertical Bars Shall Be Confined By Cross Tie Or Hoop Corner Ties At Vertical Bar Splices Shall Be Spaced At 4 in. o.c. Maximum Horizontal Wall Reinforcing Shall Be Hooked At Boundary Edge Lap Splices Of Horizontal Reinforcing Not Allowed In Boundary Members Program PC-03: Shear Wall SWF-2-2 - Tile
10/6/2011 Page 1
396
CC 05-03-2022
396 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.1.1 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 49 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 12 in. Distance measured from left end of wall, ft.

Unsupported Height 13 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 95.6 24.5
Horizontal Bars 5 (3-9) 2
Spacing 10 in. 3
Vertical Bars 6 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 6 1 225.3 13
Right End Bar Size 6 (3-10) 2 10.2 6.5
Number of Bars 6 3
Distance From End 12 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0015 Actual: 0.0031 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0026 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 10 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 329.7 kips φVn = 1347.4 kips OK DCR = 0.24
Bending Check: φ = 0.89
Mu left = 4193.3 ft-kips φMn = 4503.2 ft-kips OK DCR = 0.93 Mu right = 4193.3 ft-kips φMn = 4503.2 ft-kips OK DCR = 0.93 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW1-1-1 - Tile
10/6/2011 Page 1
397
CC 05-03-2022
397 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW1.1.2 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 25 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 12 in. Distance measured from left end of wall, ft.

Unsupported Height 13 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 48.8 12.5
Horizontal Bars 5 (3-9) 2
Spacing 10 in. 3
Vertical Bars 6 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain S S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 6 1 119.5 13
Right End Bar Size 6 (3-10) 2 10.2 6.5
Number of Bars 6 3
Distance From End 6 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0015 Actual: 0.0031 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0026 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 10 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 181.6 kips φVn = 687.4 kips OK DCR = 0.26
Bending Check: φ = 0.89
Mu left = 2267.7 ft-kips φMn = 2292.8 ft-kips OK DCR = 0.99 Mu right = 2267.7 ft-kips φMn = 2292.8 ft-kips OK DCR = 0.99 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW1-1-2 - Tile
10/6/2011 Page 1
398
CC 05-03-2022
398 of 1033
Program: PC-03 CONCRETE SHEAR WALL
Designation: SW5.1.5 1998 CBC (1985 UBC Sim.)
Input Data:

Wall Length 5.67 ft. Vertical Loads, kips: (Special = assembly, > 100 psf or garage) Wall Thickness 18 in. Distance measured from left end of wall, ft.

Unsupported Height 5.75 ft. Load No. Dead, kipsLive, kipsDistance Special (Y/N) 1 18.9 2.835
Horizontal Bars 5 (3-9) 2
Spacing 12 in. 3
Vertical Bars 5 (3-9) 4
Spacing 12 in. 5
Single or Double Curtain D S/D
Lateral Loads
Left End Bar Size 6 (3-10) Load No. Force, kipsHeight, ft.

Number of Bars 3 1 27.4 5.75
Right End Bar Size 6 (3-10) 2 4 2.875
Number of Bars 3 3
Distance From End 3 in. 4
Boundary Tie Bars (3-6) if required. 5
6 Concrete Strength, f'c 3.5 ksi
Reinforcing Yield, Fy 40 ksi Note: Program does not calculate wall self weight! Code Minimum Checks:

Minimum Wall Vertical Reinforcing Ratio: 0.0012 Actual: 0.0029 OK Minimum Wall Horizontal Reinforcing Ratio: 0.0020 Actual: 0.0029 OK Maximum Vertical Reinforing Spacing: 18 Actual: 12 OK
Maximum Horizontal Reinforing Spacing: 18 Actual: 12 OK Double Curtain Reinforcing Check: Double Reinforcing Curtain Required Hooked Shear Reinforcing Check: Hooked Shear Reinforcing Not Required Maximum Axial Load Check: OK
Shear Check:
φ = 0.85
Vu = 44.0 kips φVn = 243.4 kips OK DCR = 0.18
Bending Check: φ = 0.89
Mu left = 236.7 ft-kips φMn = 252.6 ft-kips OK DCR = 0.94 Mu right = 236.7 ft-kips φMn = 252.6 ft-kips OK DCR = 0.94 Boundary Member Check:

Boundary Member Required: NO
* * *
* * *
* * * * *
* * * * *
* * *
*
*
*
*
*
*
Program PC-03: Shear Wall SW5-1-5 - Tile
10/6/2011 Page 1
399
CC 05-03-2022
399 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
60 in
12 in
15 in
3 inβ 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2006 IBC & ASCE 7-05
12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft L(0.3) L(0.3) L(0.3) L(0.3) L(0.135) L(0.15) L(0.192) L(0.15)D(0.2490) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 12.0 in, Total Height = 15.0 in, Top Flange Width = 60.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #2 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #3 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 1.50 in from Bottom, from 6.0 to 18.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #4 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 8.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #5 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.0830
Uniform Load on ALL spans : D = 0.0830 ksf, Tributary Width = 3.0 ft Load for Span Number 1
Uniform Load : L = 0.10 ksf, Tributary Width = 3.0 ft, (corridor LL) Load for Span Number 2
Uniform Load : L = 0.10 ksf, Extent = 8.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (assembly LL) Uniform Load : L = 0.10 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 3.0 ft, (coridor) Load for Span Number 3
Uniform Load : L = 0.10 ksf, Extent = 0.0 -->> 18.0 ft, Tributary Width = 3.0 ft, (assembly LL) Uniform Load : L = 0.0450 ksf, Extent = 18.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (office LL) Load for Span Number 4
Uniform Load : L = 0.050 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 3.0 ft, (office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 3.0 ft, (corridor LL) 400 CC 05-03-2022
400 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load for Span Number 5
Uniform Load : L = 0.050 ksf, Tributary Width = 3.0 ft, (office LL) .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.882: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (LL*L*) Span # where maximum occurs Span # 2
Location of maximum on span 0.000ft
Mn * Phi : Allowable 57.522 k-ft
Typical SectionSection used for this span
Mu : Applied -50.717k-ft
Maximum Deflection
4357
1869
Ratio = 6972
Max Downward L+Lr+S Deflection 0.111in 2595Ratio =
Max Upward L+Lr+S Deflection -0.066in Ratio =
Max Downward Total Deflection 0.154in Ratio =
Max Upward Total Deflection -0.041in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 11.528 5.442 13.998 15.052 11.326 4.012 D Only 6.762 2.359 5.819 6.762 5.819 2.359 L Only, LL Comb Run (****L) 2.347 0.004 0.103 -0.026 -0.388 1.559 L Only, LL Comb Run (***L*) 2.264 -0.014 -0.325 0.081 2.123 -0.194 L Only, LL Comb Run (***LL) 4.611 -0.009 -0.222 0.056 1.736 1.365 L Only, LL Comb Run (**L**) -0.501 0.090 3.950 -0.539 3.126 0.083 L Only, LL Comb Run (**L*L) 1.846 0.094 4.054 -0.564 2.738 1.642 L Only, LL Comb Run (**LL*) 1.763 0.076 3.625 -0.457 5.249 -0.110 L Only, LL Comb Run (**LLL) 4.110 0.081 3.728 -0.483 4.861 1.449 L Only, LL Comb Run (*L***) 0.155 -0.353 4.125 3.919 -0.620 -0.026 L Only, LL Comb Run (*L**L) 2.502 -0.349 4.229 3.893 -1.008 1.533 L Only, LL Comb Run (*L*L*) 2.419 -0.367 3.800 4.000 1.503 -0.219 L Only, LL Comb Run (*L*LL) 4.766 -0.362 3.903 3.974 1.116 1.339 L Only, LL Comb Run (*LL**) -0.346 -0.263 8.076 3.380 2.505 0.058 L Only, LL Comb Run (*LL*L) 2.001 -0.259 8.179 3.354 2.118 1.616 L Only, LL Comb Run (*LLL*) 1.918 -0.277 7.750 3.461 4.629 -0.136 L Only, LL Comb Run (*LLLL) 4.265 -0.273 7.854 3.436 4.241 1.423 L Only, LL Comb Run (L****) -0.052 3.118 -0.775 4.694 0.207 0.009 L Only, LL Comb Run (L***L) 2.295 3.122 -0.672 4.668 -0.181 1.567 L Only, LL Comb Run (L**L*) 2.212 3.104 -1.101 4.775 2.330 -0.185 L Only, LL Comb Run (L**LL) 4.559 3.108 -0.997 4.749 1.943 1.374 L Only, LL Comb Run (L*L**) -0.552 3.207 3.175 4.155 3.332 0.092 L Only, LL Comb Run (L*L*L) 1.795 3.212 3.279 4.129 2.945 1.651 L Only, LL Comb Run (L*LL*) 1.712 3.194 2.850 4.237 5.456 -0.102 L Only, LL Comb Run (L*LLL) 4.058 3.198 2.953 4.211 5.068 1.457 L Only, LL Comb Run (LL***) 0.103 2.765 3.350 8.612 -0.413 -0.017 L Only, LL Comb Run (LL**L) 2.450 2.769 3.454 8.587 -0.801 1.542 L Only, LL Comb Run (LL*L*) 2.367 2.751 3.025 8.694 1.710 -0.211 L Only, LL Comb Run (LL*LL) 4.714 2.755 3.128 8.668 1.322 1.348 L Only, LL Comb Run (LLL**) -0.397 2.854 7.301 8.074 2.712 0.066 L Only, LL Comb Run (LLL*L) 1.950 2.859 7.404 8.048 2.325 1.625 L Only, LL Comb Run (LLLL*) 1.867 2.841 6.975 8.155 4.836 -0.127 L Only, LL Comb Run (LLLLL) 4.213 2.845 7.079 8.129 4.448 1.431 D+L, LL Comb Run (****L) 9.109 2.363 5.922 6.736 5.431 3.918 D+L, LL Comb Run (***L*) 9.026 2.345 5.493 6.844 7.942 2.165 D+L, LL Comb Run (***LL) 11.373 2.350 5.597 6.818 7.555 3.724 D+L, LL Comb Run (**L**) 6.262 2.449 9.769 6.224 8.944 2.442 D+L, LL Comb Run (**L*L) 8.609 2.453 9.872 6.198 8.557 4.001 D+L, LL Comb Run (**LL*) 8.526 2.435 9.444 6.305 11.068 2.249 D+L, LL Comb Run (**LLL) 10.872 2.439 9.547 6.279 10.680 3.808 D+L, LL Comb Run (*L***) 6.917 2.006 9.944 10.681 5.199 2.333 D+L, LL Comb Run (*L**L) 9.264 2.010 10.047 10.655 4.811 3.892 D+L, LL Comb Run (*L*L*) 9.181 1.992 9.619 10.762 7.322 2.140 D+L, LL Comb Run (*L*LL) 11.528 1.997 9.722 10.736 6.934 3.698 D+L, LL Comb Run (*LL**) 6.417 2.096 13.894 10.142 8.324 2.417 D+L, LL Comb Run (*LL*L) 8.764 2.100 13.998 10.117 7.937 3.975 D+L, LL Comb Run (*LLL*) 8.681 2.082 13.569 10.224 10.448 2.223 D+L, LL Comb Run (*LLLL) 11.027 2.086 13.672 10.198 10.060 3.782 D+L, LL Comb Run (L****) 6.701 5.390 4.904 11.653 6.063 2.369 D+L, LL Comb Run (L***L) 9.048 5.392 5.004 11.632 5.676 3.928 D+L, LL Comb Run (L**L*) 8.966 5.382 4.588 11.722 8.184 2.175 D+L, LL Comb Run (L**LL) 11.312 5.384 4.688 11.700 7.797 3.734 401 CC 05-03-2022
401 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 D+L, LL Comb Run (L*L**) 6.196 5.439 8.790 11.206 9.206 2.453 D+L, LL Comb Run (L*L*L) 8.543 5.442 8.890 11.185 8.819 4.012 D+L, LL Comb Run (L*LL*) 8.461 5.432 8.474 11.273 11.326 2.260 D+L, LL Comb Run (L*LLL) 10.808 5.434 8.574 11.252 10.940 3.818 D+L, LL Comb Run (LL***) 6.882 5.290 9.425 15.003 5.342 2.339 D+L, LL Comb Run (LL**L) 9.228 5.289 9.521 14.987 4.956 3.898 D+L, LL Comb Run (LL*L*) 9.147 5.290 9.122 15.052 7.460 2.145 D+L, LL Comb Run (LL*LL) 11.493 5.290 9.218 15.037 7.074 3.704 D+L, LL Comb Run (LLL**) 6.371 5.279 13.218 14.691 8.507 2.424 D+L, LL Comb Run (LLL*L) 8.717 5.278 13.314 14.676 8.122 3.983 D+L, LL Comb Run (LLLL*) 8.636 5.281 12.917 14.737 10.625 2.230 D+L, LL Comb Run (LLLLL) 10.983 5.280 13.012 14.723 10.239 3.789 .Shear Stirrup Requirements
Between 0.00 to 19.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 20.40 to 27.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 27.60 to 45.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 45.60 to 50.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 51.00 to 70.20 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 70.80 to 71.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 72.00 to 95.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 96.00 to 96.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 97.20 to 119.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -43.98 57.52 0.76
Span # 2 2 24.000 -50.72 57.52 0.88
Span # 3 3 48.000 -42.92 57.52 0.75
Span # 4 4 72.000 -35.54 57.52 0.62
Span # 5 5 96.000 -35.80 57.52 0.62
+1.40D
Span # 1 1 23.400 -18.16 57.52 0.32
Span # 2 2 24.000 -21.14 57.52 0.37
Span # 3 3 48.000 -15.85 57.52 0.28
Span # 4 4 95.400 -18.56 57.52 0.32
Span # 5 5 96.000 -21.14 57.52 0.37
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.40 57.52 0.27
Span # 2 2 24.000 -17.95 57.52 0.31
Span # 3 3 48.000 -14.25 57.52 0.25
Span # 4 4 95.400 -24.87 57.52 0.43
Span # 5 5 96.000 -27.38 57.52 0.48
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.07 57.52 0.28
Span # 2 2 24.000 -18.64 57.52 0.32
Span # 3 3 71.400 -19.05 57.52 0.33
Span # 4 4 84.000 16.39 35.90 0.46
Span # 5 5 96.000 -25.55 57.52 0.44
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.91 57.52 0.28
Span # 2 2 24.000 -18.47 57.52 0.32
Span # 3 3 71.400 -16.65 57.52 0.29
Span # 4 4 95.400 -30.37 57.52 0.53
Span # 5 5 96.000 -34.81 57.52 0.61
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.77 35.90 0.24
Span # 2 2 47.400 -24.96 57.52 0.43
Span # 3 3 48.000 -27.37 57.52 0.48
Span # 4 4 72.000 -26.40 57.52 0.46
Span # 5 5 96.000 -14.91 57.52 0.26
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.80 35.90 0.25
Span # 2 2 47.400 -25.60 57.52 0.45
Span # 3 3 48.000 -28.04 57.52 0.49
Span # 4 4 72.000 -23.92 57.52 0.42 402 CC 05-03-2022
402 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 2 & 3; assembly)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 2 2 24.000 -27.01 57.52 0.47
Span # 3 3 48.000 -21.20 57.52 0.37
Span # 4 4 95.400 -18.01 57.52 0.31
Span # 5 5 96.000 -20.22 57.52 0.35
+1.20D+0.50L+0.20S+E, LL Comb Run (
Span # 1 1 23.400 -23.40 57.52 0.41
Span # 2 2 24.000 -27.23 57.52 0.47
Span # 3 3 48.000 -20.35 57.52 0.35
Span # 4 4 72.000 -19.21 57.52 0.33
Span # 5 5 96.000 -19.65 57.52 0.34
+1.20D+0.50L+0.20S+E, LL Comb Run (
Span # 1 1 23.400 -23.35 57.52 0.41
Span # 2 2 24.000 -27.18 57.52 0.47
Span # 3 3 48.000 -20.55 57.52 0.36
Span # 4 4 95.400 -19.73 57.52 0.34
Span # 5 5 96.000 -22.54 57.52 0.39
+0.90D+1.60W+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
+0.90D+E+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 1 0.1540 10.800 -0.0109 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 2 0.0641 13.200 -0.0280 3.600 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 3 0.0787 10.800 -0.0060 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 4 0.0427 10.800 -0.0149 20.400 D+L, LL Comb Run (L*L*L) 5 0.0843 13.200 0.0000 20.400 403
CC 05-03-2022
403 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
60 in
12 in
15 in
3 inβ 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2006 IBC & ASCE 7-05
12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft 12" w x 15" hSpan=24.0 ft D(0.2490) L(0.30)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 12.0 in, Total Height = 15.0 in, Top Flange Width = 60.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #2 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #3 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 1.50 in from Bottom, from 6.0 to 18.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 18.0 to 24.0 ft in this span Span #4 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 8.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 6.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 16.0 to 24.0 ft in this span Span #5 Reinforcing....
1-#8 at 1.50 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 1.50 in from Bottom, from 4.0 to 24.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 20.0 ft in this span 1-#8 at 2.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 2.0 in from Top, from 4.0 to 24.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.0830, L = 0.10
Uniform Load on ALL spans : D = 0.0830, L = 0.10 ksf, Tributary Width = 3.0 ft .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.890: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*L*LL) Span # where maximum occurs Span # 5
Location of maximum on span 0.000ft
Mn * Phi : Allowable 57.522 k-ft
Typical SectionSection used for this span
Mu : Applied -51.188k-ft
Maximum Deflection
4301
1846
Ratio = 6573
Max Downward L+Lr+S Deflection 0.113in 2549Ratio =
Max Upward L+Lr+S Deflection -0.067in Ratio =
Max Downward Total Deflection 0.156in Ratio =
Max Upward Total Deflection -0.044in
.404
CC 05-03-2022
404 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 15.107 5.448 14.275 15.098 14.275 5.448 D Only 6.762 2.359 5.819 6.762 5.819 2.359 L Only, LL Comb Run (****L) 4.694 0.009 0.207 -0.052 -0.775 3.118 L Only, LL Comb Run (***L*) 3.919 -0.026 -0.620 0.155 4.125 -0.353 L Only, LL Comb Run (***LL) 8.612 -0.017 -0.413 0.103 3.350 2.765 L Only, LL Comb Run (**L**) -0.568 0.095 4.074 -0.568 4.074 0.095 L Only, LL Comb Run (**L*L) 4.125 0.103 4.280 -0.620 3.299 3.212 L Only, LL Comb Run (**LL*) 3.350 0.069 3.454 -0.413 8.199 -0.258 L Only, LL Comb Run (**LLL) 8.044 0.078 3.660 -0.465 7.424 2.859 L Only, LL Comb Run (*L***) 0.155 -0.353 4.125 3.919 -0.620 -0.026 L Only, LL Comb Run (*L**L) 4.849 -0.344 4.332 3.867 -1.395 3.092 L Only, LL Comb Run (*L*L*) 4.074 -0.379 3.505 4.074 3.505 -0.379 L Only, LL Comb Run (*L*LL) 8.767 -0.370 3.712 4.022 2.730 2.739 L Only, LL Comb Run (*LL**) -0.413 -0.258 8.199 3.350 3.454 0.069 L Only, LL Comb Run (*LL*L) 4.280 -0.250 8.406 3.299 2.678 3.187 L Only, LL Comb Run (*LLL*) 3.505 -0.284 7.579 3.505 7.579 -0.284 L Only, LL Comb Run (*LLLL) 8.199 -0.276 7.786 3.454 6.804 2.833 L Only, LL Comb Run (L****) -0.052 3.118 -0.775 4.694 0.207 0.009 L Only, LL Comb Run (L***L) 4.642 3.126 -0.568 4.642 -0.568 3.126 L Only, LL Comb Run (L**L*) 3.867 3.092 -1.395 4.849 4.332 -0.344 L Only, LL Comb Run (L**LL) 8.561 3.100 -1.189 4.797 3.557 2.773 L Only, LL Comb Run (L*L**) -0.620 3.212 3.299 4.125 4.280 0.103 L Only, LL Comb Run (L*L*L) 4.074 3.221 3.505 4.074 3.505 3.221 L Only, LL Comb Run (L*LL*) 3.299 3.187 2.678 4.280 8.406 -0.250 L Only, LL Comb Run (L*LLL) 7.992 3.195 2.885 4.229 7.631 2.868 L Only, LL Comb Run (LL***) 0.103 2.765 3.350 8.612 -0.413 -0.017 L Only, LL Comb Run (LL**L) 4.797 2.773 3.557 8.561 -1.189 3.100 L Only, LL Comb Run (LL*L*) 4.022 2.739 2.730 8.767 3.712 -0.370 L Only, LL Comb Run (LL*LL) 8.716 2.747 2.937 8.716 2.937 2.747 L Only, LL Comb Run (LLL**) -0.465 2.859 7.424 8.044 3.660 0.078 L Only, LL Comb Run (LLL*L) 4.229 2.868 7.631 7.992 2.885 3.195 L Only, LL Comb Run (LLLL*) 3.454 2.833 6.804 8.199 7.786 -0.276 L Only, LL Comb Run (LLLLL) 8.147 2.842 7.011 8.147 7.011 2.842 D+L, LL Comb Run (****L) 11.653 2.369 6.063 6.701 4.904 5.390 D+L, LL Comb Run (***L*) 10.681 2.333 5.199 6.917 9.944 2.006 D+L, LL Comb Run (***LL) 15.013 2.339 5.343 6.881 9.419 5.285 D+L, LL Comb Run (**L**) 6.194 2.454 9.892 6.194 9.892 2.454 D+L, LL Comb Run (**L*L) 11.181 2.465 10.155 6.128 8.909 5.442 D+L, LL Comb Run (**LL*) 10.113 2.428 9.272 6.349 14.018 2.101 D+L, LL Comb Run (**LLL) 14.684 2.436 9.459 6.302 13.325 5.273 D+L, LL Comb Run (*L***) 6.917 2.006 9.944 10.681 5.199 2.333 D+L, LL Comb Run (*L**L) 11.784 2.016 10.183 10.621 4.301 5.375 D+L, LL Comb Run (*L*L*) 10.836 1.980 9.324 10.836 9.324 1.980 D+L, LL Comb Run (*L*LL) 15.107 1.986 9.457 10.803 8.841 5.286 D+L, LL Comb Run (*LL**) 6.349 2.101 14.018 10.113 9.272 2.428 D+L, LL Comb Run (*LL*L) 11.309 2.111 14.275 10.048 8.308 5.428 D+L, LL Comb Run (*LLL*) 10.268 2.075 13.398 10.268 13.398 2.075 D+L, LL Comb Run (*LLLL) 14.774 2.082 13.573 10.224 12.751 5.276 D+L, LL Comb Run (L****) 6.701 5.390 4.904 11.653 6.063 2.369 D+L, LL Comb Run (L***L) 11.601 5.396 5.143 11.601 5.143 5.396 D+L, LL Comb Run (L**L*) 10.621 5.375 4.301 11.784 10.183 2.016 D+L, LL Comb Run (L**LL) 14.974 5.377 4.443 11.755 9.645 5.285 D+L, LL Comb Run (L*L**) 6.128 5.442 8.909 11.181 10.155 2.465 D+L, LL Comb Run (L*L*L) 11.125 5.448 9.166 11.125 9.166 5.448 D+L, LL Comb Run (L*LL*) 10.048 5.428 8.308 11.309 14.275 2.111 D+L, LL Comb Run (L*LLL) 14.642 5.432 8.493 11.270 13.569 5.274 D+L, LL Comb Run (LL***) 6.882 5.290 9.425 15.003 5.342 2.339 D+L, LL Comb Run (LL**L) 11.755 5.290 9.651 14.964 4.442 5.377 D+L, LL Comb Run (LL*L*) 10.803 5.290 8.846 15.098 9.457 1.986 D+L, LL Comb Run (LL*LL) 15.092 5.288 8.970 15.082 8.964 5.283 D+L, LL Comb Run (LLL**) 6.303 5.278 13.333 14.673 9.458 2.436 D+L, LL Comb Run (LLL*L) 11.271 5.279 13.576 14.631 8.491 5.432 D+L, LL Comb Run (LLLL*) 10.224 5.282 12.758 14.763 13.571 2.082 D+L, LL Comb Run (LLLLL) 14.751 5.279 12.922 14.740 12.914 5.274 405 CC 05-03-2022
405 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :
.Shear Stirrup Requirements
Between 0.00 to 19.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 20.40 to 27.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 27.60 to 45.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 45.60 to 51.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 51.60 to 68.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 69.00 to 74.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 75.00 to 92.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 93.00 to 99.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.4.5.1, use stirrups spaced at 6.000 in Between 100.20 to 119.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -44.44 57.52 0.77
Span # 2 2 24.000 -51.19 57.52 0.89
Span # 3 3 48.000 -44.34 57.52 0.77
Span # 4 4 95.400 -44.93 57.52 0.78
Span # 5 5 96.000 -51.19 57.52 0.89
+1.40D
Span # 1 1 23.400 -18.16 57.52 0.32
Span # 2 2 24.000 -21.14 57.52 0.37
Span # 3 3 48.000 -15.85 57.52 0.28
Span # 4 4 95.400 -18.56 57.52 0.32
Span # 5 5 96.000 -21.14 57.52 0.37
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -15.24 57.52 0.27
Span # 2 2 24.000 -17.79 57.52 0.31
Span # 3 3 48.000 -14.91 57.52 0.26
Span # 4 4 95.400 -33.84 57.52 0.59
Span # 5 5 ##.### 23.10 35.90 0.64
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.53 57.52 0.29
Span # 2 2 24.000 -19.11 57.52 0.33
Span # 3 3 71.400 -25.90 57.52 0.45
Span # 4 4 84.000 26.00 35.90 0.72
Span # 5 5 96.000 -31.68 57.52 0.55
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -16.21 57.52 0.28
Span # 2 2 24.000 -18.78 57.52 0.33
Span # 3 3 71.400 -21.10 57.52 0.37
Span # 4 4 95.400 -44.06 57.52 0.77
Span # 5 5 96.000 -50.20 57.52 0.87
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.80 35.90 0.25
Span # 2 2 47.400 -25.70 57.52 0.45
Span # 3 3 48.000 -28.14 57.52 0.49
Span # 4 4 72.000 -28.14 57.52 0.49
Span # 5 5 96.000 -14.48 57.52 0.25
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.85 35.90 0.25
Span # 2 2 47.400 -26.98 57.52 0.47
Span # 3 3 48.000 -29.46 57.52 0.51
Span # 4 4 95.400 -30.66 57.52 0.53
Span # 5 5 ##.### 23.65 35.90 0.66
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.65 35.90 0.24
Span # 2 2 47.400 -21.86 57.52 0.38
Span # 3 3 71.400 -37.08 57.52 0.64
Span # 4 4 72.000 -43.02 57.52 0.75
Span # 5 5 96.000 -28.04 57.52 0.49
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 3.600 8.70 35.90 0.24
Span # 2 2 47.400 -23.14 57.52 0.40
Span # 3 3 71.400 -32.28 57.52 0.56
Span # 4 4 95.400 -40.88 57.52 0.71
Span # 5 5 96.000 -46.56 57.52 0.81
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.400 -28.79 57.52 0.50
Span # 2 2 36.000 26.00 35.90 0.72 406 CC 05-03-2022
406 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Joist J-1 (betw. gl 1 & 2; corridor)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
+0.90D+1.60W+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
+0.90D+E+1.60H
Span # 1 1 23.400 -11.67 57.52 0.20
Span # 2 2 24.000 -13.59 57.52 0.24
Span # 3 3 48.000 -10.19 57.52 0.18
Span # 4 4 95.400 -11.93 57.52 0.21
Span # 5 5 96.000 -13.59 57.52 0.24
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (L*L*L) 1 0.1560 10.800 -0.0112 25.200 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 2 0.0667 13.200 -0.0289 3.600 D+L, LL Comb Run (L*L*L) 3 0.0869 13.200 0.0000 3.600 D+L, LL Comb Run (L*L*L)D+L, LL Comb Run (*L*L*) 4 0.0667 10.800 -0.0289 20.400 D+L, LL Comb Run (L*L*L) 5 0.1560 13.200 0.0000 20.400 407
CC 05-03-2022
407 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =60.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft L(0.504) L(0.768) L(0.768)
L(1.536) L(0.768) L(0.504) L(0.768) L(0.504)D(2.616)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Top, from 8.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span 2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 2-#8 at 3.0 in from Bottom, from 16.0 to 24.0 ft in this span Span #3 Reinforcing....
2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 1-#11 at 3.0 in from Top, from 16.0 to 24.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 0.0 to 20.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#11 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 8.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (Multiuse LL) Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 12.0 ft, (corridor LL) Load for Span Number 2
Uniform Load : L = 0.0640 ksf, Tributary Width = 24.0 ft, (corridor LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) .
408
CC 05-03-2022
408 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.542: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (LL*L) Span # where maximum occurs Span # 2
Location of maximum on span 0.000ft
Mn * Phi : Allowable 649.56k-ft
Typical SectionSection used for this span
Mu : Applied -352.01k-ft
Maximum Deflection
7683
4605
Ratio =32410
Max Downward L+Lr+S Deflection 0.032in 8907Ratio =
Max Upward L+Lr+S Deflection -0.037in Ratio =
Max Downward Total Deflection 0.063in Ratio =
Max Upward Total Deflection -0.009in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.978 38.150 96.809 111.577 106.834 D Only 24.665 24.665 58.299 71.753 71.753
L Only, LL Comb Run (***L) 13.220 -0.136 -3.271 0.818 19.898 L Only, LL Comb Run (**L*) -1.499 0.409 17.445 -2.453 16.627 L Only, LL Comb Run (**LL) 11.721 0.273 14.174 -1.635 36.525 L Only, LL Comb Run (*L**) 0.494 -1.810 21.065 20.078 -2.962 L Only, LL Comb Run (*L*L) 13.713 -1.947 17.794 20.895 16.935 L Only, LL Comb Run (*LL*) -1.005 -1.401 38.510 17.625 13.665 L Only, LL Comb Run (*LLL) 12.214 -1.538 35.239 18.442 33.562 L Only, LL Comb Run (L***) -0.145 13.441 -3.480 21.955 0.870 L Only, LL Comb Run (L**L) 13.075 13.304 -6.751 22.772 20.768 L Only, LL Comb Run (L*L*) -1.644 13.850 13.964 19.501 17.497 L Only, LL Comb Run (L*LL) 11.576 13.713 10.693 20.319 37.395 L Only, LL Comb Run (LL**) 0.349 11.630 17.585 42.032 -2.092 L Only, LL Comb Run (LL*L) 13.568 11.494 14.314 42.850 17.806 L Only, LL Comb Run (LLL*) -1.150 12.039 35.029 39.579 14.535 L Only, LL Comb Run (LLLL) 12.069 11.903 31.758 40.397 34.432 D+L, LL Comb Run (***L) 37.742 24.517 54.783 72.639 91.982 D+L, LL Comb Run (**L*) 23.166 25.074 75.744 69.300 88.380 D+L, LL Comb Run (**LL) 37.333 24.995 73.933 69.776 106.155 D+L, LL Comb Run (*L**) 25.159 22.855 79.365 91.831 68.791 D+L, LL Comb Run (*L*L) 37.956 22.712 75.451 92.768 89.640 D+L, LL Comb Run (*LL*) 23.660 23.264 96.809 89.378 85.418 D+L, LL Comb Run (*LLL) 37.332 23.153 94.223 90.040 104.307 D+L, LL Comb Run (L***) 24.510 38.005 54.631 93.947 72.681 D+L, LL Comb Run (L**L) 37.673 37.947 51.366 94.617 92.701 D+L, LL Comb Run (L*L*) 22.994 38.122 71.626 92.149 89.413 D+L, LL Comb Run (L*LL) 37.308 38.150 70.188 92.351 106.834 D+L, LL Comb Run (LL**) 25.091 37.585 77.866 110.898 69.199 D+L, LL Comb Run (LL*L) 37.978 37.550 74.239 111.577 89.824 D+L, LL Comb Run (LLL*) 23.567 37.593 94.685 109.348 85.976 D+L, LL Comb Run (LLLL) 37.387 37.622 92.523 109.663 104.501 .Shear Stirrup Requirements
Between 0.00 to 4.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 5.40 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 20.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 21.00 to 25.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 10.000 in Between 26.40 to 32.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 33.00 to 40.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 41.40 to 45.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 46.20 to 49.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 50.40 to 54.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 55.20 to 64.20 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 64.80 to 69.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 69.60 to 74.40 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 10.000 in Between 75.00 to 81.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 82.20 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -305.27 649.56 0.47
Span # 2 2 24.000 -352.01 649.56 0.54 409 CC 05-03-2022
409 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G1 (gridline B)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 72.000 -145.30 751.89 0.19
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L*)D+L, LL Comb Run (L*L*) 1 0.0625 10.800 -0.0033 25.200 D+L, LL Comb Run (*L*L) 2 0.0291 13.200 0.0000 25.200 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 3 0.0261 10.800 -0.0078 20.400 D+L, LL Comb Run (*L*L) 4 0.0608 13.200 0.0000 20.400 410
CC 05-03-2022
410 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G2 (gridline C; fixed seating)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=32.0 ft 16" w x 36" hSpan=16.0 ft 16" w x 36" hSpan=24.0 ft L(1.008) L(1.536) L(1.44) L(1.536) L(1.008) L(1.008)D(2.616) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 15.750 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 6.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 21.750 ft in this span 2-#11 at 3.0 in from Top, from 17.10 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 15.0 ft in this span 2-#8 at 3.0 in from Top, from 17.10 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Bottom, from 1.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 10.0 to 16.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 9.250 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 9.250 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Load for Span Number 2
Uniform Load : L = 0.060 ksf, Tributary Width = 24.0 ft, (Assembly LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Uniform Load : L = 0.0420 ksf, Extent = 8.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Office LL) .
411
CC 05-03-2022
411 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:51PM
Description : Girder G2 (gridline C; fixed seating)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.841: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*LL*) Span # where maximum occurs Span # 3
Location of maximum on span 0.000ft
Mn * Phi : Allowable 439.06k-ft
Typical SectionSection used for this span
Mu : Applied -369.18k-ft
Maximum Deflection
5289
2118
Ratio = 6791
Max Downward L+Lr+S Deflection 0.120in 3204Ratio =
Max Upward L+Lr+S Deflection -0.073in Ratio =
Max Downward Total Deflection 0.181in Ratio =
Max Upward Total Deflection -0.028in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.310 34.529 108.545 124.971 82.567 D Only 26.609 22.211 63.586 84.361 54.369
L Only, LL Comb Run (***L) 10.212 -0.099 -3.681 0.434 17.326 L Only, LL Comb Run (**L*) -0.553 0.154 11.731 -0.674 9.694 L Only, LL Comb Run (**LL) 9.659 0.055 8.050 -0.240 27.020 L Only, LL Comb Run (*L**) 0.839 -3.190 31.350 25.474 -8.393 L Only, LL Comb Run (*L*L) 11.052 -3.289 27.669 25.908 8.933 L Only, LL Comb Run (*LL*) 0.286 -3.035 43.081 24.800 1.300 L Only, LL Comb Run (*LLL) 10.499 -3.135 39.400 25.234 18.626 L Only, LL Comb Run (L***) -0.115 11.130 -2.721 18.971 1.152 L Only, LL Comb Run (L**L) 10.097 11.031 -6.402 19.404 18.478 L Only, LL Comb Run (L*L*) -0.668 11.284 9.010 18.297 10.845 L Only, LL Comb Run (L*LL) 9.544 11.185 5.329 18.730 28.171 L Only, LL Comb Run (LL**) 0.724 7.940 28.628 44.445 -7.242 L Only, LL Comb Run (LL*L) 10.936 7.841 24.948 44.878 10.084 L Only, LL Comb Run (LLL*) 0.171 8.094 40.360 43.771 2.452 L Only, LL Comb Run (LLLL) 10.383 7.995 36.679 44.204 19.778 D+L, LL Comb Run (***L) 36.362 22.159 59.111 84.759 72.937 D+L, LL Comb Run (**L*) 26.051 22.294 75.204 83.829 64.110 D+L, LL Comb Run (**LL) 35.989 22.213 71.035 84.260 82.183 D+L, LL Comb Run (*L**) 27.860 19.060 98.305 108.859 43.131 D+L, LL Comb Run (*L*L) 37.310 18.992 94.061 109.053 61.991 D+L, LL Comb Run (*LL*) 27.166 19.140 108.545 108.723 53.993 D+L, LL Comb Run (*LLL) 36.883 19.095 105.038 108.770 71.975 D+L, LL Comb Run (L***) 26.564 34.487 62.618 101.063 54.820 D+L, LL Comb Run (L**L) 36.362 34.441 58.234 101.444 73.263 D+L, LL Comb Run (L*L*) 26.004 34.529 74.175 100.611 64.584 D+L, LL Comb Run (L*LL) 35.968 34.491 70.115 100.956 82.567 D+L, LL Comb Run (LL**) 27.765 31.840 97.656 124.675 43.696 D+L, LL Comb Run (LL*L) 37.249 31.741 93.294 124.971 62.569 D+L, LL Comb Run (LLL*) 27.113 31.974 108.401 124.310 54.186 D+L, LL Comb Run (LLLL) 36.858 31.909 104.758 124.446 72.205 .Shear Stirrup Requirements
Between 0.00 to 3.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 4.20 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 19.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.40 to 28.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 5.000 in Between 29.60 to 36.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 36.80 to 44.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 44.80 to 50.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 51.20 to 56.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 8.000 in Between 57.20 to 61.20 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 61.60 to 68.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 69.20 to 71.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 72.00 to 72.60 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 73.20 to 79.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 80.40 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -415.20 646.99 0.64
Span # 2 2 24.000 -463.37 576.91 0.80 412 CC 05-03-2022
412 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 85.800 121.61 474.11 0.26
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 1 0.0426 10.800 -0.0155 20.400 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 2 0.2161 17.600 -0.0085 32.800 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 3 0.0089 17.200 -0.0315 7.200 D+L, LL Comb Run (*L*L) 4 0.0744 13.200 0.0000 7.200 413
CC 05-03-2022
413 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=32.0 ft 16" w x 36" hSpan=16.0 ft 16" w x 36" hSpan=24.0 ft L(1.008) L(1.536) L(1.2) L(0.504) L(1.536) L(0.045) L(1.008)D(2.616) .Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 15.750 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 6.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 21.750 ft in this span 2-#11 at 3.0 in from Top, from 25.250 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 25.250 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Bottom, from 1.0 to 16.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 2-#11 at 3.0 in from Bottom, from 11.0 to 16.0 ft in this span Span #4 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 9.250 ft in this span 2-#8 at 3.0 in from Top, from 0.0 to 9.250 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.1090
Uniform Load on ALL spans : D = 0.1090 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 24.0 ft, (Office LL) Uniform Load : L = 0.0640 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Load for Span Number 2
Uniform Load : L = 0.10 ksf, Tributary Width = 12.0 ft, (Assembly LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) Load for Span Number 3
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 8.0 ft, Tributary Width = 24.0 ft, (Corridor LL) Uniform Load : L = 0.0450 k/ft, Extent = 8.0 -->> 16.0 ft, Tributary Width = 1.0 ft, (Office LL) Load for Span Number 4
Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (Office LL) .
414
CC 05-03-2022
414 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.894: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*LL*) Span # where maximum occurs Span # 3
Location of maximum on span 0.000ft
Mn * Phi : Allowable 439.06k-ft
Typical SectionSection used for this span
Mu : Applied -392.60k-ft
Maximum Deflection
5354
1776
Ratio =6086
Max Downward L+Lr+S Deflection 0.155in 2481Ratio =
Max Upward L+Lr+S Deflection -0.072in Ratio =
Max Downward Total Deflection 0.216in Ratio =
Max Upward Total Deflection -0.032in
.

Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 37.528 34.517 112.925 129.909 76.522 D Only 26.609 22.211 63.586 84.361 54.369
L Only, LL Comb Run (***L) 10.212 -0.099 -3.681 0.434 17.326 L Only, LL Comb Run (**L*) -0.296 0.108 9.797 -0.474 3.513 L Only, LL Comb Run (**LL) 9.916 0.009 6.117 -0.041 20.839 L Only, LL Comb Run (*L**) 0.993 -3.774 37.097 30.144 -9.932 L Only, LL Comb Run (*L*L) 11.205 -3.873 33.416 30.578 7.394 L Only, LL Comb Run (*LL*) 0.697 -3.666 46.894 29.670 -6.420 L Only, LL Comb Run (*LLL) 10.909 -3.765 43.213 30.104 10.906 L Only, LL Comb Run (L***) -0.115 11.130 -2.721 18.971 1.152 L Only, LL Comb Run (L**L) 10.097 11.031 -6.402 19.404 18.478 L Only, LL Comb Run (L*L*) -0.411 11.238 7.076 18.496 4.664 L Only, LL Comb Run (L*LL) 9.801 11.139 3.395 18.930 21.990 L Only, LL Comb Run (LL**) 0.878 7.356 34.376 49.115 -8.780 L Only, LL Comb Run (LL*L) 11.090 7.257 30.695 49.549 8.546 L Only, LL Comb Run (LLL*) 0.582 7.464 44.173 48.640 -5.268 L Only, LL Comb Run (LLLL) 10.794 7.365 40.492 49.074 12.058 D+L, LL Comb Run (***L) 36.362 22.159 59.111 84.759 72.937 D+L, LL Comb Run (**L*) 26.309 22.263 73.294 83.999 57.918 D+L, LL Comb Run (**LL) 36.179 22.196 69.017 84.412 76.172 D+L, LL Comb Run (*L**) 28.113 18.191 103.990 114.026 41.343 D+L, LL Comb Run (*L*L) 37.528 18.140 99.805 114.157 60.226 D+L, LL Comb Run (*LL*) 27.703 18.258 112.925 113.845 45.582 D+L, LL Comb Run (*LLL) 37.240 18.228 109.103 113.884 64.048 D+L, LL Comb Run (L***) 26.564 34.487 62.618 101.063 54.820 D+L, LL Comb Run (L**L) 36.362 34.441 58.234 101.444 73.263 D+L, LL Comb Run (L*L*) 26.263 34.517 72.293 100.745 58.382 D+L, LL Comb Run (L*LL) 36.170 34.476 68.122 101.102 76.522 D+L, LL Comb Run (LL**) 28.037 30.957 103.781 129.726 41.580 D+L, LL Comb Run (LL*L) 37.470 30.883 99.567 129.909 60.443 D+L, LL Comb Run (LLL*) 27.638 31.029 112.628 129.570 45.862 D+L, LL Comb Run (LLLL) 37.225 30.985 108.922 129.618 64.170 .Shear Stirrup Requirements
Between 0.00 to 3.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 4.20 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.40 to 19.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.40 to 29.60 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 4.000 in Between 30.40 to 36.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 36.80 to 44.00 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 44.80 to 49.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 50.40 to 56.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 6.000 in Between 57.20 to 61.20 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 61.60 to 69.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 70.00 to 71.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 72.00 to 72.00 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 72.60 to 79.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 80.40 to 90.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 91.20 to 95.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.400 -437.09 646.99 0.68
Span # 2 2 24.000 -485.82 576.91 0.84 415 CC 05-03-2022
415 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G2 (gridline D)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 4 4 85.800 121.61 474.11 0.26
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (*L*L)D+L, LL Comb Run (L*L*) 1 0.0426 10.800 -0.0155 20.400 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 2 0.2161 17.600 -0.0085 32.800 D+L, LL Comb Run (*L*L)D+L, LL Comb Run (*L*L) 3 0.0089 17.200 -0.0315 7.200 D+L, LL Comb Run (*L*L) 4 0.0744 13.200 0.0000 7.200 416
CC 05-03-2022
416 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Material Properties Calculations per ACI 318-08, IBC 2009, CBC 2010, ASCE 7-05

3.50 7.50
145.0
Elastic Modulus 3,372.17ksi
1 =40.0
29,000.0

40.0 29,000.0
3=
2 = 0.90

0.750
f'c ksi
fy - Main Rebar ksi
Density
1/2
=
fr = f'c * 443.71
pcf
E - Main Rebar ksi
psi
= 1.0λ LtWt Factor
Fy - Stirrups ksi
==
=
E - Stirrups ksi
64 in
16 in
36 in
3 in
β 0.850
==
=
Shear :

Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Phi Values Flexure :
ψ
#
φ
Load Combination : 2009 IBC & ASCE 7-05
16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft 16" w x 36" hSpan=24.0 ft D(2.6)
L(0.768) L(0.504)
D(0.456)
L(0.768) L(1.008)
L(0.504)
L(1.008)D(2.40)
.Cross Section & Reinforcing Details
Tee Section, Stem Width = 16.0 in, Total Height = 36.0 in, Top Flange Width = 64.0 in, Flange Thickness = 3.0 in Span #1 Reinforcing....
1-#8 at 3.0 in from Bottom, from 0.0 to 19.0 ft in this span 2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 8.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 18.0 to 24.0 ft in this span Span #2 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 6.0 ft in this span 1-#8 at 3.0 in from Bottom, from 2.0 to 22.0 ft in this span 2-#11 at 3.0 in from Bottom, from 18.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 16.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 6.0 ft in this span 2-#11 at 3.0 in from Top, from 8.0 to 24.0 ft in this span Span #3 Reinforcing....
2-#11 at 3.0 in from Bottom, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Bottom, from 4.0 to 24.0 ft in this span 2-#11 at 3.0 in from Top, from 0.0 to 24.0 ft in this span 1-#8 at 3.0 in from Top, from 0.0 to 6.0 ft in this span .Service loads entered. Load Factors will be applied for calculations.Applied Loads Loads on all spans...

D = 0.10
Uniform Load on ALL spans : D = 0.10 ksf, Tributary Width = 24.0 ft Load for Span Number 1
Uniform Load : L = 0.0640 ksf, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Tributary Width = 12.0 ft, (office LL) Uniform Load : D = 0.0380 ksf, Extent = 0.0 -->> 14.0 ft, Tributary Width = 12.0 ft, (addl slab DL) Point Load : D = 2.60 k @ 14.0 ft
Load for Span Number 2
Uniform Load : L = 0.0640 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (corridor LL) Uniform Load : L = 0.0420 ksf, Extent = 16.0 -->> 24.0 ft, Tributary Width = 24.0 ft, (office LL) Uniform Load : L = 0.0420 ksf, Extent = 0.0 -->> 16.0 ft, Tributary Width = 12.0 ft, (office LL) Load for Span Number 3
Uniform Load : L = 0.0420 ksf, Tributary Width = 24.0 ft, (office LL) .Design OKDESIGN SUMMARY
Maximum Bending Stress Ratio = 0.997: 1
Load Combination +1.20D+0.50Lr+1.60L+1.60H, LL Comb Run (*L*) Span # where maximum occurs Span # 2
Location of maximum on span 12.200ft
Mn * Phi : Allowable 118.80k-ft
Typical SectionSection used for this span
Mu : Applied 118.47k-ft
Maximum Deflection
6969
3572
Ratio =16621
Max Downward L+Lr+S Deflection 0.043in 6648Ratio =
Max Upward L+Lr+S Deflection -0.041in Ratio =
Max Downward Total Deflection 0.081in Ratio =
Max Upward Total Deflection -0.017in
.
417
CC 05-03-2022
417 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Load Combination Support 1 Support 2 Support 3 Support 4 Vertical Reactions - Unfactored Support notation : Far left is #1 Overall MAXimum 40.666 92.137 103.500 34.360
D Only 27.966 62.342 68.266 23.210
L Only, LL Comb Run (**L) 0.403 15.725 -2.419 10.483 L Only, LL Comb Run (*L*) -1.470 14.870 16.434 -1.418 L Only, LL Comb Run (*LL) -1.067 30.595 14.015 9.065 L Only, LL Comb Run (L**) 13.229 -3.053 19.843 0.509 L Only, LL Comb Run (L*L) 13.632 12.672 17.424 10.992 L Only, LL Comb Run (LL*) 11.758 11.817 36.278 -0.909 L Only, LL Comb Run (LLL) 12.162 27.542 33.858 9.574 D+L, LL Comb Run (**L) 28.375 78.111 65.818 33.673 D+L, LL Comb Run (*L*) 26.550 77.292 84.579 21.778 D+L, LL Comb Run (*LL) 26.815 92.137 82.807 32.632 D+L, LL Comb Run (L**) 40.558 58.323 89.547 23.883 D+L, LL Comb Run (L*L) 40.666 73.764 87.714 34.360 D+L, LL Comb Run (LL*) 40.193 74.841 103.500 22.194 D+L, LL Comb Run (LLL) 40.274 89.845 101.926 32.876 .Shear Stirrup Requirements
Between 0.00 to 5.40 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 5.60 to 13.80 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 14.00 to 20.00 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 20.20 to 25.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 9.000 in Between 26.00 to 31.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 31.80 to 40.60 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 40.80 to 46.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 46.80 to 49.80 ft, PhiVc < Vu, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 12.000 in Between 50.00 to 56.60 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in Between 56.80 to 67.40 ft, Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Between 67.60 to 71.80 ft, PhiVc/2 < Vu <= PhiVc, Req'd Vs = Min 11.5.6.3, use stirrups spaced at 11.000 in .Maximum Forces & Stresses for Load Combinations
Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
MAXimum BENDING Envelope
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -277.39 367.89 0.75
+1.40D
Span # 1 1 23.800 -205.60 367.89 0.56
Span # 2 2 47.800 -180.07 296.54 0.61
Span # 3 3 48.000 -187.83 367.89 0.51
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -160.88 367.89 0.44
Span # 2 2 47.800 -215.64 296.54 0.73
Span # 3 3 48.000 -222.93 367.89 0.61
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -232.22 367.89 0.63
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -215.46 367.89 0.59
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -216.87 367.89 0.59
Span # 2 2 47.800 -265.82 296.54 0.90
Span # 3 3 48.000 -277.39 367.89 0.75
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 10.000 274.14 399.60 0.69
Span # 2 2 24.000 -263.59 367.89 0.72
Span # 3 3 48.000 -141.46 367.89 0.38
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 10.200 280.63 399.60 0.70
Span # 2 2 24.000 -248.11 367.89 0.67
Span # 3 3 61.800 229.76 399.60 0.57
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 24.000 -320.05 367.89 0.87
Span # 3 3 48.000 -195.92 367.89 0.53
+1.20D+0.50Lr+1.60L+1.60H, LL Comb
Span # 1 1 23.800 -289.52 367.89 0.79
Span # 2 2 47.800 -247.10 296.54 0.83 418 CC 05-03-2022
418 of 1033
Concrete Beam ENERCALC, INC. 1983-2011, Build:6.11.9.9, Ver:6.11.9.9 Licensee : AHEARN & KNOX, INCLic. # : KW-06003381
File: P:\Cupertino\M11-040 City Hall Analysis\Calcs\m11-040 enercalc.ec6 Printed: 15 SEP 2011, 12:52PM
Description : Girder G3 (gridline E)
1505 Meridian Avenue, Suite B
San Jose, CA 95125
(408) 978-1970
WWW.AKHSE.COM
Title : Cupertino City Hall
Job # M11-040
Project Desc.:

Dsgnr:

Project Notes :

Span #
Bending Stress Results ( k-ft )Location (ft)Load Combination Mu : Max Stress RatioSegment Length Phi*Mnxin Span
Span # 3 3 48.000 -257.85 367.89 0.70
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -160.88 367.89 0.44
Span # 2 2 47.800 -215.64 296.54 0.73
Span # 3 3 48.000 -222.93 367.89 0.61
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -232.22 367.89 0.63
Span # 2 2 36.200 118.47 118.80 1.00
Span # 3 3 48.000 -215.46 367.89 0.59
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -216.87 367.89 0.59
Span # 2 2 47.800 -265.82 296.54 0.90
Span # 3 3 48.000 -277.39 367.89 0.75
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 10.000 274.14 399.60 0.69
Span # 2 2 24.000 -263.59 367.89 0.72
Span # 3 3 48.000 -141.46 367.89 0.38
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 10.200 280.63 399.60 0.70
Span # 2 2 24.000 -248.11 367.89 0.67
Span # 3 3 61.800 229.76 399.60 0.57
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -304.88 367.89 0.83
Span # 2 2 24.000 -320.05 367.89 0.87
Span # 3 3 48.000 -195.92 367.89 0.53
+1.20D+1.60L+0.50S+1.60H, LL Comb R
Span # 1 1 23.800 -289.52 367.89 0.79
Span # 2 2 47.800 -247.10 296.54 0.83
Span # 3 3 48.000 -257.85 367.89 0.70
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -171.43 367.89 0.47
Span # 2 2 47.800 -173.50 296.54 0.59
Span # 3 3 48.000 -180.35 367.89 0.49
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -193.73 367.89 0.53
Span # 2 2 47.800 -170.03 296.54 0.57
Span # 3 3 48.000 -178.02 367.89 0.48
+1.20D+1.60Lr+0.50L, LL Comb Run (*
Span # 1 1 23.800 -188.93 367.89 0.51
Span # 2 2 47.800 -189.18 296.54 0.64
Span # 3 3 48.000 -197.37 367.89 0.54
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -198.93 367.89 0.54
Span # 2 2 24.000 -209.86 367.89 0.57
Span # 3 3 48.000 -154.89 367.89 0.42
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -194.14 367.89 0.53
Span # 2 2 47.800 -167.65 296.54 0.57
Span # 3 3 48.000 -174.25 367.89 0.47
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -216.43 367.89 0.59
Span # 2 2 24.000 -227.51 367.89 0.62
Span # 3 3 48.000 -171.91 367.89 0.47
+1.20D+1.60Lr+0.50L, LL Comb Run (L
Span # 1 1 23.800 -211.63 367.89 0.58
Span # 2 2 47.800 -183.33 296.54 0.62
Span # 3 3 48.000 -191.27 367.89 0.52
.

Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections - Unfactored Loads
D+L, LL Comb Run (L*L)D+L, LL Comb Run (L*L) 1 0.0806 10.200 -0.0029 24.600 D+L, LL Comb Run (L*L)D+L, LL Comb Run (L*L) 2 0.0027 24.600 -0.0173 9.000 D+L, LL Comb Run (L*L) 3 0.0519 12.600 0.0000 9.000 419
CC 05-03-2022
419 of 1033

CITY OF CUPERTINO
Agenda Item
22-10825 Agenda Date: 5/3/2022
Agenda #: 1.

Subject: Proclamations honoring musicians from two Cupertino High Schools (Homestead- Cupertino Symphony Orchestra and Homestead Symphonic Wind Ensemble) for their performances at the Washington D.C. International Music Festival on April 16 and 17, 2022 Present proclamations honoring musicians from two Cupertino High Schools (Homestead-Cupertino Symphony Orchestra and Homestead Symphonic Wind Ensemble) for their performances at the Washington D.C. International Music Festival on April 16 and 17, 2022 CITY OF CUPERTINO Printed on 4/28/2022Page 1 of 1
powered by Legistar™
420
CC 05-03-2022
420 of 1033
I
I
1,
I
I
(
S
R'- ]:1
ri
t!0 n xx- nr- nxxmgii '- - - - - - - - - - -- -- -- -- - - - - - - - - - - -- -- -- -- - - - - - - - - - -- -- -- -- - - - - - - - - - -- -- -- -- - I ._ l'_ ila-
. . _ a -- l ., , , , _ _ . _ %, l . 1 , . - } A . 1 _ ' S a ' - a '( " - ' " " - '1. .
1 , " ( l
-> a CITYOF
CUPERTlf%O
f-
WHEREAS, The City of Cupertino wishes to recognize the musicians from Cupertino who represented our City and local high schools at the Washington D.C. International Music Festival recently; WHEREAS, The City is honored to have outstanding musicians from our City who shared their performances in our nation's capital; WHEREAS, In Cupertino, we have many students and teachers who dedicate ' their time, effort, and talent to enriching the community through music and performance, and the City c6ngrahilates these individuals for their extraordinary performances, contributions, and accomplishments;
WHEREAS, The City of Cupertino is proud to be home to these exceptional and talented young musicians.

THEREFORE, I, Mayor Darcy Paul, and the Cupertino City Council do hereby ' Proclaim its support of
95ft O (Z- C)ycAst'i<ymlAggyty5ewtiw
. ' and we thank all the student musicians, directors, and participants for representing our ' "o. ' community at this year's Washington D.C. Interrxational Music Festival.

J(i IN WITNESS THEREOF, I have hereunto set my hand and caused the seal of the City of ' . ". ..Cupertino to be affixed this Tuesday, May Third, Two Thousand and Twenty JI'wo. ' . " -. "
6 r
l
I
l
J
_/ fl " " o -:- ".'
._==. - aa ' -. l)arcv Paul / a " - a " " :a '.S., " ' J l - -. a - Ss _-. " . _ ' - . ' - - . . '- _ ' as " l . ' " ' l i. l " _ , . .. . , . ,'=lls-l' -
.,\,' :,: HJ'. : ). '.. :. ' . , 1, . Mayor"' >' r S "'\1" sa "" '* -' X \ '.' s ' = ' } a a - ' ( - ' " " . ' _ - . , :, " " ' - -, , ,I"' "' "' :._ ' - l' -:"'ia:\" :'>'i :" s'. 'S Sl
%L'
lUffiXNmXXi_ )l!,_ u0 0! U m) ,4
u- W d-
421
CC 05-03-2022
421 of 1033
- 4 & _. 4_ &
9 I
i- ] );) n n -m
r*
!lD 0 -ri -m\- ]):)
n
l)m ,,,d!) M
':'i\\''_"-sS'i','-l.'-"'- ' "-..""' "' a'-'=.'a_-aa.i'-.:'-SVr"'-- %'_ S l l { ' , - _ - ( s " '
X,IX,,IS ylS=(.,,lla"Xllll.l' s: aia : ,,' .1' - ,. " ,.l"aSi', ,"X:X':a'X-_ S 1 l - ( l , , s i ' i ' _ i . . ( l } , l S '} l l ' - - ' " " s ( 1 l - l '. . ' - - " ' a l _ . ' * l a ""-',a"' .-' - CITYOF
S'r3,,.':5 .S.f. \ s :.; . _ ._ . . : _ . . ' _ _ . l'a ' a. :ay_' as-J. +i :::):, %" ::., _ , , . , , . l .-. ' ,. - , l" ' 1 , . . . , , ., s } '
I' " ' a 1 " " - - - a . . ' _ ' ( a " a " 1 " l " . '1 - 11, J, .1 _ ' _., . , , _ _
'1 a - a i -
z -_ }' _
'i, 11' 1 ' .

CUPERTlf%O
7-
WHEREAS, The City of Cupertino wishes to recognize the musicians from Cupertino who represented our City and local high schools at the Washington D.C. International Music Festival recently; WHEREAS, The City is honored to have outstanding musicians from our City who shared their performances in our nation's capital; WHEREAS, In Cupertino, we have many students and teachers who dedicate their time, effort, and talent to enriching the community through music and performance, and the City co"ngrahilates these individuals for their extraordinary performances, contributions, and accomplishments;
WHEREAS, The City of Cupertino is proud to be home to these exceptional and talented young musicians.

THEREFORE, I, Mayor Darcy Paul, and the Cupertino City Council do hereby Proclaim its support of
(5)@';d 6uem,6Ze3'fmmmteai(;[ ym,bAm=
and we thank all the student musicians, directors, and participants for representing our ' community at this year's Washington D.C. Intern/ational Music Festival.

IN WITNESS THEREOF, I have hereunto set my hand and caused the seal of the City of Cupertino to be affixed this Tuesday, May Third, Two Thousand and Twenty Two. - I
I
I
I
I
I
I
I
I
I
I
I
I
I
/l
/ /'/l -
DarcyPaul ( . ' . -,__
Mayoj '-,} - o. _"-',, I
I
I _ _ _ _ _ __ __ __ __ _ _ _ _ _ _ _ _ _ __ __ __ __ _ _ _ _ _ _ _ _ _ _ __ __ __ __ _ _ _ _ _ _ _ _ _ _. _,-_ uJ 0UUM, uJ 0UU=- UU 0U!,! '(
7 7 W - r - Q
422
CC 05-03-2022
422 of 1033

CITY OF CUPERTINO
Agenda Item
22-10834 Agenda Date: 5/3/2022
Agenda #: 2.

Subject: Proclamation commemorating the Eid al-Fitr holiday, honoring the end of Ramadan for members of the Islamic faith and celebrating religious freedoms for every member of the Cupertino community
Present Proclamation commemorating the Eid al-Fitr holiday, honoring the end of Ramadan for members of the Islamic faith and celebrating religious freedoms for every member of the Cupertino community
CITY OF CUPERTINO Printed on 4/28/2022Page 1 of 1
powered by Legistar™
423
CC 05-03-2022
423 of 1033
4 & 4 /
l
I
r
I
i- ! ):) 0 n M n :)n 4-)m\- t):iVm ,,,d!) -- - - - - - - - - - -- -- -- -- - - - - - - - - - - -- -- -- -- - - - - - - - - - - -- -- -- -- - - - - - - - - - -- -- -- -- - - - - - - - - - -- -- -- -- - - - - - - - - --l !."gl
X'%'-s)'\\l',,.:""V':-""""_-.i ' . l(.,l"'a'-"' :': '_-. l"'IT(l'i"._-',J"s'._%.l"'1yS%'H'l"..", -;.;-,a-:\.)=,;.-;:.:'"7;:':,a.,:',_-" . ' ciyy,or. " " '.-.-.-a_ _,.....) -.-: '):)'\" % a 1 al '. - - ' } - " i a . . . .
aJSaXX r-'11',#a'- -l . - ') - ( . .l ., . y , _ '. %%' -s . S. § .a '- s i -
's - ' l ' a
K - - ' ai - '- (
' - S a s : a -, ' I
- ( l '.. - '
,, , , 4. ,%. , . ,.
1 l t ., .i"
l' a .4,, _,. , .

S .. . ls i .
ffl
' , _ 1 - - ,_ . . } a.
2II 8
CUPERTlhO
.f-
WHEREAS, The City of Cupertino wishes to recognize the Muslim community on the occasion of Eid al-Fitr, also known as the "Festival of Breaking the Fast," to honor the end of Ramadan;
WHEREAS, The Eid al-Fitr holiday marks the end of Ramadan, the Islamic holy month of fasting and spiritual renewal for Muslims worldwide; WHEREAS, During the month of Ramadan, Muslims are reminded that their religion requires them to reflect on and renew their faith, give charity to the hungry and the needy, and respect and honor their fellow human beings; WHEREAS, Locally, the Muslim Community Association of Santa Clara (MCA) ' inspires and empowers its congregation to live according to the values of the Islamic faith;
WHEREAS, Muslims are a part of the fabric of our community in the City of Cupertino and the greater Bay Area region, and we recognize the contributions, rich cultural heritage, and diversity they bring to our community.

THEREFORE, I, Mayor Darcy Paul, and the Cupertino City Council do hereby Proclaim its recognition of
Jtaj-:c
and the end of the holy month of Ramadan, which i4 observed and celebrated by over one bfflion people worldwide, including residents of the City of Cupertino.

IN WITNESS THEREOF, I have hereunto set my hand and caused the seal of the City of Cupertino to be affixed this Tuesday, May Third, Two Thousand and Twenty Two. " 'l
6arcyPaul (,,/ . . . i ,'..'_....

Mayor Q'!
I
'1
!
1,
$x_ UU
l
Uu,4, uJ 0UU=i?_,_ UU !)U!,! 'l
-
424
CC 05-03-2022
424 of 1033

CITY OF CUPERTINO
Agenda Item
21-10219 Agenda Date: 5/3/2022
Agenda #: 3.

Subject: Brief reports on councilmember activities and brief announcements Receive brief reports on councilmember activities and brief announcements CITY OF CUPERTINO Printed on 4/27/2022Page 1 of 1
powered by Legistar™
425
CC 05-03-2022
425 of 1033

CITY OF CUPERTINO
Agenda Item
21-10230 Agenda Date: 5/3/2022
Agenda #: 4.

Subject: Report on Committee assignments
Report on Committee assignments
CITY OF CUPERTINO Printed on 4/27/2022Page 1 of 1
powered by Legistar™
426
CC 05-03-2022
426 of 1033

CITY OF CUPERTINO
Agenda Item
21-10241 Agenda Date: 5/3/2022
Agenda #: 5.

Subject: City Manager update
Receive City Manager update on City business
CITY OF CUPERTINO Printed on 4/27/2022Page 1 of 1
powered by Legistar™
427
CC 05-03-2022
427 of 1033

CITY OF CUPERTINO
Agenda Item
22-10839 Agenda Date: 5/3/2022
Agenda #: 6.

Subject: Approve the April 19 City Council minutes
Approve the April 19 City Council minutes
CITY OF CUPERTINO Printed on 4/28/2022Page 1 of 1
powered by Legistar™
428
CC 05-03-2022
428 of 1033

DRAFT MINUTES

CUPERTINO CITY COUNCIL
Tuesday, April 19, 2022

SPECIAL MEETING

At 5:30 p.m., Mayor Darcy Paul called the Special City Council Meeting to order in the Cupertino Community Hall Council Chamber, 10350 Torre Avenue and via teleconference.

ROLL CALL

Present: Mayor Darcy Paul, Vice Mayor Liang Chao, and Councilmembers Kitty Moore, Hung Wei, and Jon Robert Willey. Absent: None.

STUDY SESSION

1. Subject: Consideration of update on the City of Cupertino Lobbyist Registration Program pursuant to Cupertino Municipal Code Chapter 2.100 regarding lobbying registration and reporting requirements
Recommended Action: Receive the update on the City of Cupertino Lobbyist Registration Program pursuant to Cupertino Municipal Code Chapter 2.100 regarding lobbying registration and reporting requirements; provide any direction to staff Presenter: Kirsten Squarcia, City Clerk

Mayor Paul opened the public comment period and the following people spoke.

Peggy Griffin asked about whom to contact for anyone wishing to report an unregistered lobbyist.

Jennifer Griffin supported requiring people to register as lobbyists.

Mayor Paul closed the public comment period.

Council recessed from 5:51 p.m. to 5:57 p.m.