Bid Item #7: Construction Fencing (00 72 00)
The contract price paid per linear foot for construction fencing shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in construction fencing, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #8: Clear and Grub (TS 02 41 13)
The contract lump sum price paid for clear and grub shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in clear and grub, complete in place, including remove and dispose of hedge, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #9: Sawcut (TS 02 41 13)
The contract price paid per linear foot for sawcut shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in sawcut, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #10: Demolish Asphalt Pavement (TS 02 41 13)
The contract price paid per square foot for demolish asphalt pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in demolish asphalt pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1026
CC 01-17-2023
1026 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 88
Bid Item #11: Demolish Concrete Pavement (TS 02 41 13)
The contract price paid per square foot for demolish concrete pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in demolish concrete pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #12: Demolish Site Furnishings (TS 02 41 13)
The contract lump sum price paid for demolish site furnishings shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in demolish site furnishings, complete in place, including removal and disposal of bench and associated footings, removal and salvage of trash receptacle and installation of salvaged trash receptacle, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #13: Demolish Header Board (TS 02 41 13)
The contract price paid per linear foot for demolish header board shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in demolish header board, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #14: Earthwork and Grading (TS 31 22 00)
The contract lump sum price paid for earthwork and grading shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in earthwork and grading, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #15: Soil Preparation and Fine Grading (TS 31 92 13) The contract lump sum price paid for fine grading and soil preparation shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in fine grading and soil preparation, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
1027
CC 01-17-2023
1027 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 89
Bid Item #16: Irrigation and Utility Adjustments
The contract lump sum price paid for irrigation and utility adjustments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in irrigation and utility adjustments, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #17: Irrigation (TS 32 84 00)
The contract lump sum price paid for irrigation shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in irrigation, complete in place, including mainline, hose bibb, ball valve, submeter, and shrub bubblers, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #18: Adjust Utility Boxes (TS 32 84 00)
The contract unit price for each adjust utility boxes shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in adjust utility boxes, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #19: Perimeter Gate (TS 06 40 00)
The contract unit price for each perimeter gate shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in perimeter gate, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #20: Perimeter Fence (TS 06 40 00)
The contract price paid per linear foot for perimeter fence shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in perimeter fence, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #21: Hardware Cloth Beneath Site (TS 06 40 00) The contract price paid per square foot for hardware cloth beneath site shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in hardware cloth beneath site, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1028
CC 01-17-2023
1028 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 90
Bid Item #22: Decomposed Granite Pavement (TS 32 15 40) The contract price paid per square foot for decomposed granite pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in decomposed granite pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #23: ADA Planter (TS 32 33 00)
The contract unit price for each ADA planter shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in ADA planter, complete in place, including concrete footing, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #24: Raised Planter Box (TS 06 40 00)
The contract unit price for each raised planter box shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in raised planter box, complete in place, including hardware cloth in box, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #25: Header Board (TS 06 40 00)
The contract price paid per linear foot for header board shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in header board, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #26: Mulch Surfacing (TS 32 93 00)
The contract price paid per square foot for mulch surfacing shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in mulch surfacing, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #27: Landscape Soil Preparation (TS 31 92 13)
The contract lump sum price paid for landscape soil preparation shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in landscape soil preparation, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1029
CC 01-17-2023
1029 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 91
Bid Item #28: Landscape Mulch (TS 32 93 00)
The contract price paid per square foot for landscape mulch shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in landscape mulch, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #29: Shrub, 5 gallon (TS 32 93 00)
The contract unit price for each shrub, 5 gallon shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in shrub, 5 gallon, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #30: Concrete Threshold (TS 32 13 13)
The contract unit price for each concrete threshold shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in concrete threshold, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #31: Pedestrian Concrete Pavement (TS 32 13 13) The contract price paid per square foot for pedestrian concrete pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in pedestrian concrete pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #32: Vehicular Concrete Pavement (TS 32 13 13) The contract price paid per square foot for vehicular concrete pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in vehicular concrete pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #33: Asphalt Pavement (TS 32 12 16)
The contract price paid per square foot for asphalt pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in asphalt pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1030
CC 01-17-2023
1030 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 92
Bid Item #34: Signage (TS 32 33 00)
The contract unit price for each signage shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in signage, complete in place, including mounting hardware, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Item #35: Landscape Maintenance (TS 32 01 90)
The contract price paid per month for landscape maintenance shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in landscape maintenance, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
BID ALTERNATIVES
Bid Alternate #1: Reduced hose bibb, riser and mainline (32 84 00) The contract unit price for each hose bibb, riser and mainline shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in hose bibb, riser and mainline, complete in place, including the deduction of hose bibbs risers and mainline, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Alternate #2: Furnish and install bench and bench footing (32 33 00) The contract unit price for each furnish and install bench shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved furnish and install bench, complete in place, including the furnishing and installation of bench and bench concrete footing, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Alternate #3: Furnish and install table and table footing (32 33 00) The contract unit price for each furnish and install table shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved furnish and install table, complete in place, including the furnishing and installation of bench and table concrete footing, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1031
CC 01-17-2023
1031 of 1241
Wilson Park Community Garden DEFINITION OF BID ITEMS
Proj. No. 2020-01.1 Page 93
Bid Alternate #4: Storage Shed (TS 32 33 00)
The contract unit price for each storage shed shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in storage shed, complete in place, including assembly and exterior painting, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Alternate #5: Furnish and install concrete pad and storage shed ramp (TS 32 33 00) The contract unit price for each furnish and install concrete pad and storage shed ramp shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in furnish and install concrete pad and storage shed ramp, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Bid Alternate #6: Reduce decomposed granite pavement (TS 32 15 40) The contract price paid per square foot for reduce decomposed granite pavement shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in reduce decomposed granite pavement, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. 1032
CC 01-17-2023
1032 of 1241
PUBLIC WORKS DEPARTMENT
10300 TORRE AVENUE
CUPERTINO, CALIFORNIA 95014
TECHNICAL
SPECIFICATIONS
FOR THE
Wilson Park Community Garden
19784 Wintergreen Dr.
Cupertino, CA 95014
Project Number: 2020-01.1
Date: 6/8/22
1033
CC 01-17-2023
1033 of 1241
The technical specifications contained herein have been prepared by or under the direction of the following Registered Persons:
Date: 6/8/22
MARIE MAI
Callander Associates Landscape Architecture, Inc.
Licensed Landscape Architect #5369
Expiration Date: December 31, 2023
1034
CC 01-17-2023
1034 of 1241
21059_TOC
© copyrighted 2019 Callander Associates
Landscape Architecture, Inc.
Technical Specifications
For
Wilson Park Community Garden
Cupertino, California
June 8, 2022
Section # Section Name
00 72 00 General Requirements
02 41 13 Demolition
06 40 00 Carpentry
09 91 00 Painting
31 22 00 Earthwork and Grading
31 23 00 Trenching and Backfilling
31 92 13 Landscape Soil Preparation
32 01 90 Landscape Maintenance
32 12 16 Asphalt Pavement
32 13 13 Site Concrete
32 15 40 Decomposed Granite Paving
32 33 00 Site Furnishings
32 84 00 Irrigation
32 93 00 Planting
1035
CC 01-17-2023
1035 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 00 72 00 GENERAL REQUIREMENTS
PART 1 - INFORMATION AND DOCUMENTS
1.1 REFERENCE TERMS
A. The term "Owner" or "City" shall mean "City of Cupertino" and the authorized representatives acting on the City’s behalf.
1.2 DOCUMENTS
A. Drawings and Specifications Cooperative: The Drawings and Specifications labeled "Wilson Park Community Garden" are intended to be complementary and items or information shown in one but not the other are to be included as if shown in both. Anything not expressly set forth in either but which is necessarily implied shall be furnished as though specifically both shown and mentioned without extra charge. Should anything be omitted from the drawings that are necessary for proper execution of the work herein described, it shall be the duty of the Contractor to notify the City before signing the contract.
B. Scaling of Prints: Shall be avoided and, when done, shall be the Contractor’s responsibility. Given dimensions shall take precedence. Consult the Engineer for all necessary dimensions that are not given. Check and verify all field dimensions and existing site conditions and sizes before proceeding.
C. Additional Details: Shall be furnished by the Engineer as they may be required, and shall be considered of equal force with those that accompany these Specifications.
D. Omissions or Errors: If discovered in the Drawings or Specifications, shall be brought to the attention of the Engineer. No work is to proceed where there is any uncertainty as to the meaning of these documents.
1036
CC 01-17-2023
1036 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
1.3 QUALITY CONTROL
A. Variations to Expedite the Work: Contractor shall consult the Inspector if at any time a variation in the construction or in the quality of materials as specified is desired. Contractor will be allowed to vary from the documents only after written approval of the City is obtained.
B. Building Codes: Building Codes of this State and the specific County and City and the latest rules and regulations of the National Board of Fire Underwriters and all other applicable codes and regulations shall be accurately complied with.
C. Layout of Work: Shall be done under the supervision of the Contractor by a Cityapproved Land Surveyor licensed in California using professional-type instruments. Contractor shall establish elevations and locate and stake all on-site improvements and grading for approval by the City prior to proceeding and shall be responsible for any damage that may be sustained by the City or others from incorrect locations of site improvements.
D. Substitutions: Substitutions in material or methods of construction, when necessary because of material shortages or in order to avoid serious delay, may be made only after they are approved by the City in writing.
E. Alterations and Extras: No alterations shall be made in the work from that shown in the Drawings and Specifications, and no claims will be allowed except in pursuance of a written change order countersigned by the City and the Engineer, and any alterations or changes so ordered shall in no way invalidate the contract. Should the Contractor deem any work to be an extra, the City shall be notified in writing and a written change order shall be issued before any work is executed, or no claim will be allowed.
F. Public Access: Continuous safe public access (both pedestrian and vehicular) shall be maintained along frontages, from sidewalk to park pathway, and through the park. Construct temporary walkways as necessary.
1. Barricade open depressions and holes that occur in the performance of this work. Post warning light adjacent to the depression.
2. Operate warning light during hours from dusk to dawn each day, and as otherwise required.
3. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by operations under the specified work.
1037
CC 01-17-2023
1037 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
G. Material and Workmanship: All materials and workmanship are to be the best of their respective kinds and comply with industry standards. The terms "or equal", "approved", "selected", and so forth, shall mean as approved. by the Engineer.
All materials and equipment used shall be in accordance with the manufacturer’s printed directions.
Use adequate numbers of skilled workpersons who are thoroughly trained and experienced in necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of work specified. Use equipment adequate in terms of size, capacity, and numbers to accomplish work in a timely manner.
H. Defective or Improper Work: Any work or materials not acceptable to the Engineer must be removed by the Contractor and replaced by approved materials and/or work without extra compensation. In the event that such removal might cause injury to other portions of the work, or if the Contractor refuses or neglects to remove them, then the City may deduct from the contract price such sum as judged to be just and reasonable as damage caused by noncompliance with the plans and specifications, as well as for the difference in value between the balance that may be due the Contractor.
I. De-Watering: Contractor shall generally keep work areas free of all surface water so as to permit construction work to progress in an orderly and workmanlike manner.
PART 2 - SUBMITTALS
2.1 SHOP DRAWINGS
Shop drawings shall be submitted to the Engineer for review only where so called for in the technical specification sections.
2.2 SUBMITTALS
A. Only where called for in the technical specifications, samples of materials to be used in fulfilling the requirements of the specifications shall be deposited with the Engineer at least 5 working days prior to their use in the work to allow sufficient time for review.
1038
CC 01-17-2023
1038 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
B. Submit manufacturers’ samples to the Engineer at least five (5) working days prior to execution of the work as required in the specifications and in all cases where choice of color, finish, style, or texture is involved.
2.3 TESTING
A. When testing of materials is required by these specifications, the Contractor shall give the City sufficient notice of readiness for the tests to be taken. The cost of all tests will be borne by the City except for retesting as specified below, and the minor amounts of material required for testing which the Contractor shall furnish. The Contractor will cooperate with the City’s representative in the taking of test samples. The City reserves the right to test any materials or equipment furnished by the contractor.
B. Should the results of any required test fail to meet the requirements of the Specifications, then the Contractor shall furnish new samples of new materials, as directed by the City, and additional tests shall be made at the Contractor’s expense until the test results are found to meet the requirements of the documents.
2.4 JOB SITE SAFETY
A. Neither the professional activities of the Owner’s Representative, nor the presence of the Owner’s Representative or their employees and subconsultants at a construction/project site, shall relieve the Contractor of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending and coordinating the work in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. The Owner’s Representative and their personnel have no authority to exercise any control over any construction contractor or their employees in connection with their work or any health or safety programs or procedures. The Contractor shall be solely responsible for job site safety, and the Owner’s Representative and the Owner’s Representative’s subconsultants shall be indemnified by the Contractor and shall be made additional insureds under the Contractor’s policies of general liability insurance.
1039
CC 01-17-2023
1039 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
PART 3 - TEMPORARY FACILITIES AND CONTROLS
3.1 TEMPORARY FACILITIES
A. Utilities:
1. Existing water and electricity service located on-site may be used as required for the work. Contractor shall make all such arrangements as required with the responsible utility company.
2. Existing sanitary facilities may be used on-site as required. Contractor shall obtain permission from and coordinate utility use with the City.
3. Shut downs of utilities for any reason shall be subject to approval by the City. When extended shut downs are required the Contractor shall provide standby service for normal occupancy requirements.
4. Before starting work, coordinate work and obtain clearance from utility companies and/or governmental agencies that supply existing or proposed services to project.
5. Unless they are shown to be removed, protect active utility lines shown on these plans or otherwise made known to the Contractor prior to excavating. If utilities are damaged, they shall be repaired or replaced at no additional cost to the City.
6. If active utility lines are encountered and are not shown on these plans or otherwise made known to the Contractor, the City shall be immediately notified and Contractor shall then take the necessary steps promptly to assure that service will not be interrupted.
7. If service is interrupted by work performed under this section, immediately restore service by repairing damaged utility at no additional cost to the City.
8. If existing utilities interfere with permanent facilities being constructed under this contract, immediately notify and obtain written instructions from the City.
9. Do not proceed with permanent relocation of utilities until written instructions are received from the City.
B. Protection:
1. The Contractor shall provide adequate protection for all portions of the existing site, its improvements, and its occupants throughout the work.
All damage done to existing property shall be neatly repaired or replaced at the Contractor’s expense. Work shall be executed in careful, orderly manner with the least possible disturbance to public and occupants of the area.
2. Contractor shall protect and save any and all utilities. Any time existing utilities are exposed, the City shall be notified. Repairs on existing utilities 1040
CC 01-17-2023
1040 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
shall not be performed without prior approval and inspection by the City Inspector.
C. Field Office and Enclosures:
1. Fences, enclosures, storage sheds, etc., required by the Contractor for the storing of tools and materials shall be located where approved in advance by the City. Such fences, enclosures, storage sheds, etc., are at the Contractor’s option.
D. A 6-foot high temporary chain link construction fence shall be installed as shown on plans and shall be maintained for the duration of the project. The temporary construction fencing shall be in good condition, staked into ground wherever possible, and installed with a top tension wire. The fence posts shall be two inch (2”) diameter galvanized steel. The fence fabric shall be 11-gauge, with knuckled barbs on the top edges.
3.2 CLEAN-UP
A. During the construction period, the premises shall be kept free from the accumulation of waste materials or rubbish on a daily basis. The final cleaning shall leave the facilities ready for occupancy with no additional clean up. Clean up dirt, grease, asphalt, etc., from all surfaces. Use no cleaning materials that will damage finishes.
PART 4 - MATERIALS AND EQUIPMENT
4.1 GENERAL
A. Deliver all materials and equipment to the project site in the manufacturer’s original sealed, labeled containers, if any, and protect all packaged and unpackaged items against moisture, dust, tampering or damage from improper handling or storage. Storage location shall be as approved in advance by the City.
B. Place materials and equipment on order in time to avoid job delay or hindrance.
Schedule deliveries to coincide, as nearly as possible, with construction schedule.
C. Except as specifically noted otherwise, the installation and/or maintenance directions provided by the manufacturer shall be followed for all materials and equipment.
1041
CC 01-17-2023
1041 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
D. All materials shown on the drawings or specified herein shall be new unused materials unless specified otherwise.
E. All materials not conforming to the requirements of these specifications shall be considered as defective and all such materials, whether in place or not, shall be rejected and shall be removed immediately from the job site.
F. Prior to ordering materials or starting work, the Contractor shall verify all measurements at the site and shall be held responsible for their accuracy. No extra compensation will be allowed for differences between actual dimensions and the measurements shown on the drawings.
4.2 SUBSTITUTIONS
A. In addition to the statements set forth in Paragraph 1.3D of this Section regarding the specification and naming of products, brand names, manufacturers, etc., as referenced within these Specifications, the following will apply:
1. Specific names are indicated to establish quality and functional standards required to do the work, and to meet the quality and functional standard of the contract.
2. Substitute items shall be equal or superior to the items specified at no additional cost to the City.
3. It shall be the responsibility of the Contractor to prove the equality of item(s) proposed for substitution. Therefore, the Contractor shall submit for the City’s approval all pertinent product data and samples as the City deems appropriate, to establish said product equality before commencing with that portion of the work. Failure of the Contractor to receive the City’s approval in writing shall cause the City to reject said product and its related assembly and/or installation, and require the complete replacement with that item specified, all at the Contractor’s cost. Submittals for proposed substitutions will be reviewed once at the cost of the City. Subsequent reviews of submittals will be at the cost of the Contractor on an hourly basis.
4.3 MEASUREMENT & PAYMENT
A. Where the estimated quantities for a specific portion of the work are designated on the plans as final pay quantities, said estimated quantities shall be the final quantities for which payment for such specific portion of the work will be made, unless the dimensions of said portions of the work shown on the plans are revised by the Inspector or Engineer. If such dimensions are revised, and such 1042
CC 01-17-2023
1042 of 1241
GENERAL REQUIREMENTS 00 72 00
Wilson Park Community Garden
007200_GeneralRequirements
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
revisions result in an increase or decrease in the quantities of such work, the final quantities for payment will be revised in the amount represented by the changes in the dimensions. The estimated quantities for such specific portion of the work shall be considered as approximate only and no guarantee is made that the quantities that can be determined by computations, based on the details and dimensions shown on the plans, will equal the estimated quantities. No allowance will be made in the event that the quantities based on computations do not equal the estimated quantities.
In case of a discrepancy between the quantities shown on the plans as final pay quantities and the quantity of the same items shown on the bid form, payment will be based on the final pay quantities shown on the plans.
PART 5 - RECORD DRAWINGS
5.1 One complete set of prints shall be furnished to the Contractor by the City on that the Contractor will fully illustrate all revisions, with complete dimensions, made by all crafts in the course of work. This shall include all field changes, adjustments, variances, substitutions, and deletions, whether covered by Change Orders or not. Underground installations must be located precisely as constructed on the Record Drawings.
The Record Drawings shall be updated on a daily basis, as needed, and submitted complete to the City with each pay request. Pay requests will not be processed without the aforementioned Record Drawings.
Upon completion of the work, it shall be the responsibility of the Contractor to transfer all revisions to a complete set of drawings to be provided to the City. The Contractor shall submit the Record Drawings to the City with request for final payment. Final payment will not be processed without the aforementioned Record Drawings.
PART 6 - GUARANTEES
6.1 The Contractor shall provide a written guarantee for all the work as required in the Technical Specification section.
6.2 Assemble and bind three (3) sets of all certificates, warranties, guarantees, and maintenance manuals into clearly organized files and present the files to the City at the completion of the work. Final Payments shall not be made until all documents are received and approved.
END OF SECTION 00 72 00
1043
CC 01-17-2023
1043 of 1241
DEMOLITION 02 41 13
Wilson Park Community Garden
024113_Demolition
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 02 41 13 DEMOLITION
PART 1 - GENERAL
1.1 SCOPE
A. This section shall consist of all clearing, grubbing, salvaging and removing of site furnishings, sawcutting, and demolishing of header board, planting, irrigation, concrete pavement, asphalt pavement and other miscellaneous items and erosion control measures as shown on the plans or specified herein.
B. Related work specified elsewhere:
1. Earthwork and Grading - Section 31 22 00
2. Landscape Soil Preparation – Section 31 92 13
1.2 REVIEW
A. Contractor shall review with City's Representative the exact limits of work and extent of materials to be removed.
1. Examine site and structures and determine exact nature and status of structural elements and utilities prior to commencing demolition.
2. City assumes no responsibility for actual condition of items or structures to be demolished.
3. Prior to commencing the work, perform a site survey to identify existing areas of damage to adjacent building areas and other buildings.
1.3 STANDARDS
A. All work shall conform to ANSI A10.6, Safety Requirements for Demolition Operations and to the codes and regulations of the City.
1.4 SCHEDULE
A. Submit schedule indicating proposed methods and sequence of operations for selective demolition work for review prior to commencement of work. Include coordination for shut-off, capping, and continuation of utility services as required.
1. Provide detailed sequence of demolition and removal work to ensure uninterrupted progress of adjacent building uses.
2. Coordinate continued occupancy with adjacent building tenants. 1044
CC 01-17-2023
1044 of 1241
DEMOLITION 02 41 13
Wilson Park Community Garden
024113_Demolition
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
PART 2 – PRODUCTS – NOT USED
PART 3 - EXECUTION
2.1 DEMOLITION OF STRUCTURES
A. Provide a minimum of three (3) business days notice of demolition activities.
B. Protection: Provide temporary barricades and other forms of protection as required to protect general public from injury due to selective demolition work.
Provide protective measures as required to provide free and safe passage of general public to and from occupied portions of building. Erect temporary covered passageways as required by authorities having jurisdiction.
C. Environmental Controls: Use water sprinkling, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection.
D. Utilities: Disconnect all utilities to structures to be demolished in the manner prescribed by the utility company.
E. Selective Demolition: Perform selective demolition work in a systematic manner.
Use methods required to complete work indicated on the drawings in accordance with demolition schedule and governing regulations. Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities.
F. Traffic: Do not close, block or otherwise obstruct streets, walks, or other occupied or used facilities without written permission from authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
G. Extent: Demolish foundation walls and footings to a depth of not less than 12 inches below finish grade. Demolish and remove below-grade wood or metal construction. Break up below grade concrete slabs. Completely fill below-grade areas and voids resulting from demolition work. Provide fill consisting of approved earth, gravel or sand, free of trash and debris, stones over 6 inch diameter, roots or other organic matter.
H. Clean-up: Remove debris, rubbish and other materials resulting from demolition 1045
CC 01-17-2023
1045 of 1241
DEMOLITION 02 41 13
Wilson Park Community Garden
024113_Demolition
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
operations from building site at the end of each work day. Site will be left in an orderly, safe manner at the end of each work day. Transport and legally dispose of materials off site.
I. Damages: Promptly repair damages caused to adjacent facilities by demolition work at no cost to the City.
J. Contractor Salvage: Items indicated to be removed but of salvageable value to the Contractor may be removed from structure as work progresses. Transport Contractor salvaged items from site as they are removed. Storage or sale of removed items on site will not be permitted.
2.2 CLEARING AND GRUBBING
A. Roots and other minor organic material shall be removed from topsoil, which shall be stripped and stockpiled for re‐use in raised planters. See Section 31 92 13, Landscape Soil Preparation and plans. Soil beneath pavement shall not contain organic material. See Section 31 22 00, Earthwork and Grading.
B. Contractor shall strip the site of all remaining materials not to remain as part of the finished work. All such materials shall be legally disposed of off-site at Contractor's expense except as otherwise noted on drawings. Items to be disposed of off-site include but are not limited to the following:
1. Trees, weeds, roots and other organic material, wood and trash.
C. Strip and remove weeds and trash from unpaved areas to be improved. Leave intact ornamental shrubs and trees as identified by City's Representative. The contractor shall protect surrounding areas from damage by equipment or construction operations.
D. All edges of existing paving to remain shall be sawcut in a neat clean manner.
E. All excavation within the drip line of trees to remain shall be accomplished in a careful manner. No roots greater than one-inch diameter shall be cut. Where excavation reveals roots greater than one-inch diameter that will interfere with construction, Contractor shall notify City’s Representative for direction prior to proceeding.
F. Where any marked or unmarked utility lines or other underground obstruction or piping may be encountered within the work area, notify the City's Representative or the agencies or service utility companies having jurisdiction 1046
CC 01-17-2023
1046 of 1241
DEMOLITION 02 41 13
Wilson Park Community Garden
024113_Demolition
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
thereof, and take necessary measures to prevent interruption of service (if live).
Should such lines or service be damaged, broken, or interrupted, those services shall be repaired immediately and restored by him at his own expense.
G. Abandoned lines, meters and boxes, obstructions or piping shall be removed, plugged or capped in accordance with the requirements and approval of the agencies affected. It shall be the responsibility of the Contractor to ascertain whether any public facilities exist along the line of work, whether or not shown on the plans; and Contractor shall, at the Contractor’s expense, do any necessary work to save from damage all such property in or adjacent to the work, and shall repair all damage thereto caused by the Contractor’s operations.
H. Service connections to adjacent properties requiring removal or adjustment, due to new construction, will be so removed or adjusted during the course of construction operations. The Contractor shall cooperate with the utility companies and/or agencies in such work.
I. Prior to commencement of site grading work the Contractor shall notify the City’s Representative that the site has been cleared. Site grading shall not commence until the City’s Representative has completed review of the site and has given approval to proceed.
2.3 TREE PROTECTION
A. Temporary Fencing: Install temporary fencing around tree drip line to protect remaining trees and vegetation from construction damage prior to any site preparation, demolition, or grading work. Maintain temporary fence and remove when construction is complete.
B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.
C. Do not store construction materials, debris, or excavated material inside tree drip line. Do not permit vehicles or foot traffic within tree protection zones; prevent soil compaction over root systems.
END OF SECTION 02 41 13
1047
CC 01-17-2023
1047 of 1241
CARPENTRY 06 40 00
Wilson Park Community Garden
064000_Carpentry.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 06 40 00 CARPENTRY
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all carpentry work as shown and specified, including but not limited to, the following:
1. Perimeter fence
2. Perimeter gate
3. Raised planter box
4. Header board
5. Hose bibb riser
B. Related work specified elsewhere:
1. Site Concrete - Section 32 13 13
1.2 STANDARDS
A. All lumber and wood shall conform to the following standards:
1. Except as noted, other limiting provisions shall be in accordance with "Standard Grading Rules for West Coast Lumber".
2. Structural lumber shall be of the kinds and grades as required to meet California Building code requirements.
3. Redwood lumber shall conform to the Standard Specifications for Grades of California Redwood of the Redwood Inspection Service.
B. All lumber shall be clearly stamped with the grade required. Grade markings for exposed wood shall be placed on a concealed surface.
C. Connections for wood members shall be designed to conform to the requirements of the 2016 California Building Code, Chapter 23A.
D. References:
1. ANSI/AF & PA National Design Specification for Wood Construction
1.3 DELIVERY, HANDLING & STORAGE
A. Storage: Lumber delivered to the site shall be carefully piled off the ground in such a manner as to insure proper drainage, ventilation, and protection from the weather.
1048
CC 01-17-2023
1048 of 1241
CARPENTRY 06 40 00
Wilson Park Community Garden
064000_Carpentry.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
1.4 QUALITY CONTROL
A. Reviews: Contractor shall specifically request at least two (2) working days in advance the following reviews prior to progressing with the work:
1. Layout of perimeter fence and planter boxes on site.
B. Certification: Written certificates stating quality, type, grade, and origin of all materials shall be delivered to the Owner’s Representative before the material is used on the site. Specific certification of the moisture content for all lumber after preservative treatment will be required to be delivered to the Owner’s Representative before the material is used on site.
C. Submittals:
1. Contractor shall provide shop drawings for all rough carpentry. Rough carpentry work, their related components and miscellaneous items are not necessarily individually described. The most important features are noted to show design intent. Contractor shall furnish rough carpentry work and provide shop drawings showing all fasteners, hinges, members, and accessories required to complete the work.
2. Contractor shall provide submittals for the following:
i. Corrugated metal panel
ii. Wire mesh
iii. Hardware cloth
PART 2 - PRODUCTS
2.1 MATERIALS
A. Lumber: All lumber shall be new with no re-use except where noted. Maximum moisture content of 19%. Lumber shall be redwood, unless otherwise noted.
Finish for lumber shall be unpainted, natural finish.
B. Redwood: Redwood lumber shall have the following grades:
1. Construction Heart (No. 1, 1.3E): All posts and lumber 4x4 or larger
2. Merchantable: Wooden headers, fence boards, pickets, rails, nailers, caps, splices, and stakes.
3. Sizing and Surfacing: Sizes indicated are nominal; provide actual sizes in accordance with PS 20-94. Provide dressed lumber, S4S, except as otherwise indicated.
1049
CC 01-17-2023
1049 of 1241
CARPENTRY 06 40 00
Wilson Park Community Garden
064000_Carpentry.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
C. Drain Rock: Per plans.
D. Wire Mesh and Hardware Cloth: As available from McNichols, 174 Lawrence Drive Suite G, Livermore, CA, phone 877-958-9343, or approved equal. Orient rectangular mesh with short edge of opening parallel to the ground. Staple to wood members per plans.
1. Wire Mesh, Aboveground: 1”x2” rectangular opening, hot dipped galvanized wire after welded, 21-gauge wire diameter minimum.
2. Wire Mesh, Underground, Hardware Cloth in Box, and Hardware Cloth Beneath Site: ½” x ½” square opening, hot dipped galvanized wire after welded, 16 gauge wire diameter minimum.
E. Corrugated Metal Panel: Shall be 26 gauge, 2-1/2“ rib spacing, ½“ rib height, 24” panel width, corners shall be rounded and all sharp edges shall be sanded smooth, as available from Gibraltar Building Products, or approved equal.
F. Finish Hardware: Furnish items of finish hardware, gate frame, handles, cane bolts, caster wheels, automatic door closers, post bases, etc. required to complete the work and as shown on the plans. Hardware shall be exterior, heavy-duty grade, galvanized, powder coat gray color RAL 7001, as available from Tiger Drylac Powder Coatings. Metal angles shall be A36 steel. Door closers shall meet the maximum door opening force required by code.
1. Door closer: Shall be Garden Gate Closer TB175 as available from Lockey USA, or approved equal.
2. Door lock: Shall be Trilogy T2 DL2700 Electronic Keyless Access Lock, as available from Alarm Lock Systems, LLC, or approved equal.
G. Rough Hardware:
i. Furnish items of rough hardware, connections, bolts, etc., required to complete the work. All screws and miscellaneous fittings shall be hot dipped, galvanized steel in accordance with ASTM A 153-00, unless noted otherwise (stainless steel and aluminum alloy acceptable). Finishing nails shall be used on all visible nailings unless noted otherwise. Bolts shall be hot dipped galvanized.
ii. Nails: Common wire hot-dipped galvanized. Use ring or spiral shank nails for floor sheathing. Special nailing requirements shall be as indicated. iii. Bolts: Standard mild steel, square or hexagonal head machine bolts with matching nuts and cut washers, or carriage bolts with square or hexagonal nuts and cut washers as indicated. Where exposed to view, use only hexagonal head fasteners and matching nuts, and limit 1050
CC 01-17-2023
1050 of 1241
CARPENTRY 06 40 00
Wilson Park Community Garden
064000_Carpentry.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
projection of bolt beyond face of nut to 1/2 inch.
H. Powder Driven Fasteners: Provide fastener systems complete with all necessary washers, nuts and other appurtenances. Provide one of the following acceptable products or equal product approved in accordance with Section 01600:
1. Hilti, Inc.
2. Powder Power Tool Corp.; "Drive-It"
3. Ramset Fastening Systems; "Ramset"
I. Header board: Shall be per plans.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Contractor shall be responsible for all necessary field measurements at the construction site after locations, orientations, and elevations have been established by City. All carpentry work shall be accurately fitted, vertical work shall be accurately fitted, vertical members installed plumb and evenly spaced, and end cuts made clean and square.
B. Bolting: Drill bolt holes 1/32" oversize unless otherwise noted. Tighten all nuts when placed, retighten immediately before closing with finish material or completion of the structure. Do no final bolting until structure has been properly aligned. Set threads after final tightening.
C. Washers: Mild steel washers shall be placed under the heads and nuts of all bolts.
D. End Grain Sealant: Seal wood end grain for all rough carpentry with non-toxic waterproofing wax emulsion sealant.
END OF SECTION 06 40 00
1051
CC 01-17-2023
1051 of 1241
PAINTING 09 91 00
Wilson Park Community Garden
099100_Painting1.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 09 91 00 PAINTING
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and apply all paint and other finishes as shown and specified.
B. Related work specified elsewhere:
1. Asphalt Paving - Section 32 12 16
2. Site Furnishings - Section 32 33 00
3. Carpentry - Section 06 40 00
1.2 STANDARDS
A. All work shall conform to the applicable requirements for Type II "Premium" Specifications as prepared by the Painting and Decorating Contractors of America, except as modified herein.
B. The paint manufacturer’s standard specifications will be considered as the minimum standard for the work.
1.3 SUBMITTALS
A. Submit a complete list of all materials proposed for use. The list shall show the specific label name of each product for each coat of finish. After review by the Owner’s Representative and City no deviation from the list will be permitted without further approval.
B. Provide sample finishes on the actual surfaces to be painted to verify appearance.
Approved samples will become the standard for the work.
1.4 DELIVERY, STORAGE & HANDLING
A. Special care shall be taken in the handling of paint materials to prevent spillage and fire. Remove rags, waste, and empty containers from the site at the end of each work day.
1052
CC 01-17-2023
1052 of 1241
PAINTING 09 91 00
Wilson Park Community Garden
099100_Painting1.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: All materials shall be "first line" or best quality as manufactured by KellyMoore, Pratt & Lambert, Sherwin-Williams, Sinclair, Dunn-Edwards, FullerO’Brien, Olympic, Conrad Sovig, or approved equal. Mention of these manufacturers does not necessarily constitute approval of all of their products.
Where a product is specified by name, it is intended to establish the quality required for that use.
B. Painting and Finishing Schedule
1. Storage Shed: Shall receive one coat of primer and a minimum of two coats of exterior grade, oil based high performance protective enamel paint, in Diamond Dust KM5297 for Siding Paint, and Aegean Mist KM4977 for Trim Paint, available from Kelly-Moore Paints or approved equal. Additional coats as required to produce opaque quality.
PART 3 - EXECUTION
3.1 PREPARATION
A. Take special care to prevent spilling paint materials on surfaces not intended to receive them.
B. Verify that the work to be painted is in suitable condition to receive each coat of paint. Should the Contractor find surfaces and conditions unacceptable, he shall at once report such conditions to the City and cease operations on the portion of the work affected. Application of paint shall occur only upon acceptance of surface and working conditions, and the Contractor shall be held responsible for the results. Clean all surfaces before painting.
C. All work shall be scraped, sandpapered, sandblasted, rubbed, or otherwise brought to a smooth surface before finish is applied. Fill all minor cracks and depressions, backfill and trim between edges of trim, and finish to a clean-cut edge.
D. All metal, excepting prefinished items and unless primed under other sections, shall be degreased with approved metal cleaner which will not affect the galvanized coat where it occurs.
1053
CC 01-17-2023
1053 of 1241
PAINTING 09 91 00
Wilson Park Community Garden
099100_Painting1.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
E. Pavement surfaces to receive paint shall be in condition to insure complete bonding of the applied material, and shall be subject to inspection and approval before such work commences.
3.2 APPLICATION
A. Apply all finishes in strict accordance with manufacturer’s recommendations.
There shall be no perceptible difference in the shades of each successive coat of paint. No coat of paint shall be applied before a previous coat is thoroughly dry.
B. Paint shall be applied on dry surfaces only, and worked thoroughly into all joints, crevices, and open spaces.
C. Painting shall be done at such times as approved, but no painting shall be done during wet weather, or when any surface is damp or moist.
D. Painting shall be done in a neat, workmanlike manner by skilled mechanics, and shall be uniform in appearance, smooth, free from runs, sags, defective brushing and clogging of the lines and angles.
E. Edges of paint adjoining other materials or other colors shall be sharp and clean without overlapping. After application, paint shall not run or sag and shall dry to the touch within 18 hours.
F. Wherever complete and satisfactory coverage is not obtained, the Contractor shall apply additional coats at no expense to the City.
G. Painter shall repair any scratches, chips, etc. that occur during construction.
H. All hardware shall be pre-painted on both sides prior to use.
3.3 CLEANING
A. Take special care to keep surrounding surfaces clean as the work progresses, and upon completion carefully remove all paint from surfaces not intended to receive it. Use no materials or methods that will damage surfaces.
END OF SECTION 09 91 00
1054
CC 01-17-2023
1054 of 1241
EARTHWORK AND GRADING 31 22 00
Wilson Park Community Garden
312200_EarthworkandGrading.doc
© copyrighted 2022-05-05 Callander Associates
Landscape Architecture, Inc.
SECTION 31 22 00 EARTHWORK AND GRADING
PART 1 - GENERAL
1.1 SCOPE
A. Perform all rough grading work as shown and specified including, but not necessarily limited to, stripping and stockpiling of native topsoil, site excavation and backfill for placement of hardware cloth beneath site, site grading for mulch surfacing, decomposed granite paving, garden raised planters, concrete pads and asphaltic concrete, and landscaped areas, including subgrade compaction.
B. Related work specified elsewhere:
1. Demolition - Section 02 41 13
2. Carpentry – Section 06 40 00
3. Trenching and Backfilling - Section 31 23 00
4. Decomposed Granite Paving - Section 32 15 40
5. Asphalt Pavement - Section 32 12 16
6. Landscape Soil Preparation – 31 92 13
7. Site Concrete - Section 32 13 13
1.2 STANDARDS
A. Unless otherwise shown or specified, all materials and methods shall conform to the most current Section 19 Earthwork of the State of California, Department of Transportation, Standard Specifications (DTSS) as they reasonably apply to this work, except for measurement and payment requirements.
1.3 QUALITY CONTROL
A. All excavation, placement and compaction of fill and preparation of subgrade shall be reviewed by the City. Contractor shall schedule work and notify City and Geotechnical Engineer three working days in advance of each portion of grading operations for their review, testing and approval. The Contractor shall cooperate with the City in performing these tests. All tests indicating conformance to project requirements shall be paid for by the City. Costs of retesting and reinspection required as the result of inadequate, insufficient, or incomplete work by the Contractor shall be deducted from the contract amount.
B. Compaction Test Method: Where referred to in these specifications, "compaction" or "relative compaction" shall mean the in-place dry density of soil 1055
CC 01-17-2023
1055 of 1241
EARTHWORK AND GRADING 31 22 00
Wilson Park Community Garden
312200_EarthworkandGrading.doc
© copyrighted 2022-05-05 Callander Associates
Landscape Architecture, Inc.
expressed as a percentage of the maximum dry density of the same material as determined by ASTM D-1557-02e1.
C. The Contractor shall provide compaction testing as required to confirm compliance with these specifications and drawings. All costs of such testing will be borne by the City, except as specified in Paragraph 2.3 in Section 00 72 00 General Requirements.
D. Contractor shall schedule a City inspection three (3) working days in advance following the completion of site excavation and prior to the commencement of backfill and finish grading.
1.4 LAYOUT AND GRADING CONTROL
A. Grade the site to the tolerances shown. Vertical control is established by the benchmark indicated on the drawings.
B. The Contractor shall engage the services of a City-approved Land Surveyor licensed in California to lay out the work. This surveyor shall certify that the completed work is done in a manner that the City can check for conformance as the work progresses.
C. Tolerances: Site grading shall be to the elevations shown on the Drawings, plus or minus 0.1 foot vertically.
D. Dewatering: No soil shall be compacted during periods of rain or when the ground is not drained of all free water. Soil that has been stockpiled and wetted by rain or by any other cause shall not be compacted until completely drained and until the moisture content is within the limits approved by the City.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Existing material may be used for fill after removal of all debris, and after being moisture-conditioned, if it meets the criteria in paragraph B below.
B. Soil used for compacted fill shall be free of perishable organic material, and shall meet the following requirements:
1. Physical: 100% passing 4 inch size, 10 to 75% passing the No. 200 sieve.
Plasticity Index of 12 maximum when tested in accordance with ASTM D 4318-75.
1056
CC 01-17-2023
1056 of 1241
EARTHWORK AND GRADING 31 22 00
Wilson Park Community Garden
312200_EarthworkandGrading.doc
© copyrighted 2022-05-05 Callander Associates
Landscape Architecture, Inc.
2. Chemical: Salinity Limit (ECe) saturation extract of 4.0 sodium (SAR) limit of less than 8.0.
3. Boron: Saturation extract concentration less than 1.0 ppm.
C. Minor quantities of material not meeting the above gradation may be mixed and blended with other on-site material if the resulting mixture conforms to the specifications. If the quantity of material not in conformance with the specifications becomes excessive in the opinion of the Geotechnical Engineer, it shall be removed from the site.
D. Hardware Cloth Beneath Site: See Section 06 40 00, Carpentry, paragraph 2.1.D2.
E. Topsoil: See Landscape Soil Preparation Section 31 92 13 for topsoil requirements.
PART 3 - EXECUTION
3.1 STRIPPING AND STOCKPILING OF NATIVE TOPSOIL
A. All vegetation including the top one to two inches of roots shall be removed from areas to be graded. The remaining six to twelve inches of topsoil shall be stripped and stockpiled in sufficient quantities as required to provide a 6 inch layer of topsoil in all in-ground planting areas and topsoil in all raised planters, including the ADA planter.
B. Subsoils (beneath the layer of existing topsoil) shall be excavated separately and disposed offsite.
3.2 HARDWARE CLOTH BENEATH SITE PLACEMENT
A. Excavate soil from existing grade to install hardware cloth beneath site per plans.
Overlap hardware cloth 6” min. and secure with S-hook wire clip, stainless steel, every 1’-0” per plans. Adjust depth of hardware cloth placement to accommodate irrigation mainline and fence footings per plan. Hardware cloth shall be placed beneath irrigation trenches within the fence boundary, per plans.
3.3 ROUGH GRADING
A. Prior to commencement of site grading work the Contractor shall notify the City’s Representative that the site has been cleared. The City’s Representative shall have sufficient time to review the site. Site grading shall not commence 1057
CC 01-17-2023
1057 of 1241
EARTHWORK AND GRADING 31 22 00
Wilson Park Community Garden
312200_EarthworkandGrading.doc
© copyrighted 2022-05-05 Callander Associates
Landscape Architecture, Inc.
until the City’s Representative has completed review of the site and the City has given approval to proceed.
B. Perform all cut and fill required to bring the site to the grades indicated, with proper allowances for finish materials such as paving and base. Prior to placing new fill the exposed ground surface should be scarified to a depth of six inches (or greater as indicated on plans), brought to near optimum moisture content and compacted. Areas to be planted shall be compacted to 85 percent and areas to be paved shall be compacted to at least 95 percent relative compaction as determined from ASTM Test Method D 1557-78.
C. Placement and Compaction: Approved fill material shall be placed in layers of six to eight inches in loose thickness and moisture-conditioned as necessary to achieve moisture content suitable for re-compacting. Fill material shall be compacted with equipment of such weight and design as necessary to obtain the specified compaction. Fill shall be compacted to 85 percent relative compaction in areas to be planted and at least 95 percent relative compaction in areas to be paved unless otherwise directed. In pavement areas, the upper 9 inches of subgrade shall have a minimum relative compaction of 95 percent. The resulting subgrade should be smooth and essentially unyielding. In planting areas, the upper 8 inches shall have a minimum relative compaction of 85 percent.
Between successive lifts, the fill surface shall be scarified or otherwise processed to obtain satisfactory bonding between the fill lifts.
D. Re-compaction: Where, in the judgment of the City’s Representative, the moisture content is not suitable or insufficient compaction has been obtained, the fill shall be reconditioned and/or re-compacted to the specified density prior to placing any additional fill material. The Contractor shall be responsible for placing and compacting approved fill material in accordance with these specifications. If the Contractor fails to meet the compaction requirements, he shall reduce his rate of haul, furnish additional spreading, moisture conditioning and/or compacting equipment or make any other adjustments necessary to produce a satisfactorily compacted fill.
E. All excess material and all material that is unsuitable for paving subbase or finish grading shall be disposed of off site at Contractor’s expense and includes all testing and fees required by the disposal site.
F. Where any marked or unmarked utility lines or other underground obstruction or piping may be encountered within the work area, notify the City or the Agencies or service utility companies having jurisdiction thereof, and take 1058
CC 01-17-2023
1058 of 1241
EARTHWORK AND GRADING 31 22 00
Wilson Park Community Garden
312200_EarthworkandGrading.doc
© copyrighted 2022-05-05 Callander Associates
Landscape Architecture, Inc.
necessary measures to prevent interruption of service (if live). Should such lines or service be damaged, broken, or interrupted through the Contractor’s own negligence, those services shall be repaired immediately and restored by him at his own expense. Abandoned lines, meters and boxes, obstructions or piping, shall be removed, plugged or capped in accordance with the requirements and approval of the agencies affected.
G. Rock Removal: All rocks eight cubic inches or larger shall be removed completely from the top 6 inch of subgrade prior to placement of topsoil in all planting areas. (See "Landscape Soil Preparation" for additional requirements.) All rocks not meeting criteria for fill material shall be legally disposed of off-site as the Contractor's own property.
3.4 EROSION CONTROL AND CLEAN-UP
A. Spillage: The Contractor shall prevent spillage when hauling on or adjacent to any public street or highway. In the event that such occurs, the Contractor shall remove all spillage and sweep, wash or otherwise clean such street or highways.
B. Dust Control: The Contractor shall take all precautions needed to prevent a dust nuisance to adjacent public and private properties and to prevent erosion and transportation of soil to adjacent properties due to work under this contract. Any damage so caused by the Contractor’s work under this contract shall be corrected or repaired by the Contractor at no cost to the City. In the event the Contractor fails to take such precautions or make such corrections or repairs promptly, the City may take such steps as he may deem necessary and deduct the cost of the same from the monies due to the Contractor.
C. Clean-up: The job site shall be kept neat and clear at all times, with all public walks swept clean at the end of each day, and all materials neatly stored. Upon completion of the work under this Section, remove immediately all surplus materials, rubbish and equipment associated with or used in the performance of this work. Failure to perform such cleanup operations within 48 hours of notice by the City shall be considered adequate grounds for having the work done by others at this subcontractor’s expense.
END OF SECTION 31 22 00
1059
CC 01-17-2023
1059 of 1241
TRENCHING AND BACKFILLING 31 23 00
Wilson Park Community Garden
312300_TrenchingandBackfilling.doc
© copyrighted 2022-04-28 Callander Associates
Landscape Architecture, Inc.
SECTION 31 23 00 TRENCHING AND BACKFILLING
PART 1 - GENERAL
1.1 SCOPE
A. Perform all structural excavation, trenching, and backfilling work as shown and specified including, but not necessarily limited to, footings and irrigation lines.
B. Related work specified elsewhere:
1. Earthwork and Grading - Section 31 22 00
2. Irrigation - Section 32 84 00
1.2 STANDARDS
A. Unless otherwise shown or specified, all materials and methods shall conform to Section 19 Earthwork of the State of California, Department of Transportation Standard Specifications (DTSS) as they reasonably apply to this work, except for measurement and payment requirements.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Backfill material shall consist of the same material as specified for general fill under Section 31 22 00 - Earthwork and Grading.
B. General Backfill: Backfill material shall be approved by the City’s Representative prior to its use. Excavated material and excess material from site grading may be re-used for backfilling and grading, provided such fill shall be homogeneous, free from rocks, rubbish, organic material, etc., and shall consist of fragments capable of being thoroughly crushed and consolidated into a dense, uniform compact fill, and shall meet the following requirements:
Sieve Size Percentage Passing
1 inch 100
3/4 inch 95-100
No. 200 10-75
Plasticity index 12 maximum
1060
CC 01-17-2023
1060 of 1241
TRENCHING AND BACKFILLING 31 23 00
Wilson Park Community Garden
312300_TrenchingandBackfilling.doc
© copyrighted 2022-04-28 Callander Associates
Landscape Architecture, Inc.
PART 3 - EXECUTION
3.1 EXCAVATING AND BACKFILLING FOR TRENCHES
A. Perform all necessary excavation, shoring, pumping and dewatering and backfilling required for the proper laying of all underground pipes and conduits.
B. All piping in ground shall have a minimum cover of 1'-6", except as otherwise shown, and shall be laid in ditches dug true to grade and line, avoiding sharp breaks. Piping shall bear equally over its entire length at bottom of ditch. Rock or unstable material encountered at grade shall be replaced with sand fill to a depth of 6 inches below pipe.
C. Backfill (non-drainage trenches): Fill trenches with excavated material in 6 inch to 8 inch uncompacted thick layers, compacted to 90% relative density. Backfill shall be moisture-conditioned to near-optimum in accordance with ASTM D 1557-02e1.
D. Backfilling shall be commenced as soon as practical after subsurface work is installed and reviewed by the Engineer and approved by the City.
E. No wood or debris shall be buried in any fill. The fill material shall be nonexpansive, meeting the criteria of paragraph 2.1B of Section 31 22 00 – Earthwork and Grading.
F. Provide shoring, excavation pumping and other requirements as necessary at excavations for points of connection.
3.2 STRUCTURAL EXCAVATION AND BACKFILL
A. Structural Excavation: Make all excavation to the grades and elevations shown on the drawings, or to the subgrades required to obtain the finished grades shown thereon. Accurately cut footing trenches. Where footings are to be cut "neat", the trench or excavation width shall be increased by 2 inches from the dimensions shown on the drawings, so as to permit pouring footings against earth banks. If soil type or weather does not permit such excavations, excavate wide enough to permit full forming of footings. If any excavation is made below proper grade, the City shall be immediately notified, and the grade shall be restored in whatever manner the City directs, at no expense to the City. All excavation shall be kept free of standing water until concrete work, paving or 1061
CC 01-17-2023
1061 of 1241
TRENCHING AND BACKFILLING 31 23 00
Wilson Park Community Garden
312300_TrenchingandBackfilling.doc
© copyrighted 2022-04-28 Callander Associates
Landscape Architecture, Inc.
backfilling is complete. Shore and brace excavations when required to prevent cave-ins.
B. Foundations from previous structures, underground utilities or other buried structures shall be removed in their entirety and replaced with compacted engineered fill.
C. When zones of soft or saturated soils are encountered at the over-excavated levels during excavation and compaction, deeper excavation shall be required to expose firm soil. This shall be determined in the field by the City’s Representative.
3.3 SURPLUS MATERIAL
A. Any excavated material which proves to be unsuitable or which is not required for backfilling shall be removed from the immediate work area and disposed of off-site.
3.4 CLEANUP
A. Upon completion of the work under this Section, remove immediately all surplus materials, rubbish and equipment associated with or used in the performance of this work. Failure to perform such cleanup operations within 48 hours shall be considered adequate grounds for having the work done by others at the Contractor’s expense.
END OF SECTION 31 23 00
1062
CC 01-17-2023
1062 of 1241
LANDSCAPE SOIL PREPARATION 31 92 13
Wilson Park Community Garden
319213_LandscapeSoilPreparation.doc © copyrighted 2022 Callander Associates Landscape Architecture, Inc.
SECTION 31 92 13 LANDSCAPE SOIL PREPARATION
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all landscape soil preparation as shown and specified, including, but not necessarily limited to, the following: topsoil placement and planter box backfill, organic amendment and fertilizer placement, and finish grading.
B. Related work specified elsewhere:
1. Earthwork and Grading - Section 31 22 00
2. Planting - Section 32 93 00
1.2 QUALITY CONTROL
A. Reviews: Contractor shall specifically request at least two working days in advance the following reviews prior to progressing with the work:
1. Completion of rough grading
2. Verification of amendment incorporation depths
3. Finish grade
B. Certification: Written certificates stating quantity, type, and composition, weight and origin for all amendments and chemicals shall be delivered to the City’s Representative before the material is used on the site.
C. Soil Samples: Contractor shall provide a one-quart sample of the native topsoil to Waypoint Analytical, Inc. of San Jose, (408) 727-0330, for their testing for conformance to this specification. No material shall be delivered to the site, graded on-site, or otherwise modified until the City’s Representative approves the material. All testing costs shall be paid for by the Contractor. Contractor shall allow for sufficient time for such testing prior to construction. Testing costs for the initial samples and costs for any additional samples due to noncompliance shall be paid for by the Contractor.
D. Amendment Samples: Contractor shall provide a one-quart sample of each proposed amendment to Waypoint Analytical, Inc. of San Jose, (408) 727-0330, for their testing for conformance to this specification. No material shall be delivered to the site until the City’s Representative approves the samples.
Testing costs shall be paid for by the Contractor.
1063
CC 01-17-2023
1063 of 1241
LANDSCAPE SOIL PREPARATION 31 92 13
Wilson Park Community Garden
319213_LandscapeSoilPreparation.doc © copyrighted 2022 Callander Associates Landscape Architecture, Inc.
E. Planting Areas: All areas to be planted, whether in container stock, by future gardeners, or otherwise, are defined as planting areas in these documents.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Native Topsoil: Shall be the existing surface layer of soil on site. This layer typically will be a different color and texture than the subsoil, and may be of varying thicknesses. The Contractor shall be responsible for reviewing the area limits and depths of native topsoil on site with the City’s Representative.
B. Fertilizer: Shall be determined from soils analysis results. For purposes of bidding only, assume the use of 6-20-20 commercial fertilizer, 20-10-5 planting tablets by Agriform International Chemicals, Inc., and iron sulfate.
C. Organic Amendment: Shall be BFI super-humus compost, or approved equal.
1. BFI Super Humus Compost shall conform to:
a) Gradation: A minimum of 90% of the material by weight shall pass a 1/2” screen. Material passing the 1/2” screen shall meet the following criteria.
b) Organic Content: A minimum of 50% based on dry weight and determined by ash method. A minimum of 250 lbs. organic matter per cubic yard of compost.
c) Carbon to Nitrogen Ratio: Maximum 35:1 if material is claimed to be nitrogen stabilized.
d) Soluble Salts: Soluble nutrients typically account for most of the salinity levels but sodium should account for less than 25% of the total. To avoid a leaching requirement, the addition of the compost shall result in a final ECe of the amended soil of less than 4.0 ds/m @ 25 degrees C. as determined in a saturation extract. Use the following table to determine the maximum allowable ECe (ds/m of saturation extract) of compost at desired use rate and allowable ECe increase.
e) Moisture Content: 35-60%.
Percent passing Sieve designation
85-100 9.51 mm (3/8”)
50-80 2.38 (No. 8)
0-40 500 micron (No. 35)
1064
CC 01-17-2023
1064 of 1241
LANDSCAPE SOIL PREPARATION 31 92 13
Wilson Park Community Garden
319213_LandscapeSoilPreparation.doc © copyrighted 2022 Callander Associates Landscape Architecture, Inc.
f) Contaminants: The compost shall be free of contaminants such as glass, metal and visible plastic.
g) Maturity: Physical characteristics suggestive of maturity include:
Color: dark brown to black
Odor: acceptable = none, soil like, musty or moldy
unacceptable = sour, ammonia or putrid
h) Particle Characterization: identifiable wood pieces are acceptable but the balance of material should be soil-like without recognizable grass or leaves.
PART 3 - EXECUTION
3.1 LIMITS AND GRADES
A. Grade Review: Prior to commencing soil preparation operations, Contractor shall request a review by the City’s Representative to verify specified limits and grades of work completed to date and soil preparation work to commence. Contractor shall complete the rough grading as necessary to round the top and toe of all slopes, providing naturalized contouring to integrate newly graded areas with the natural topography. Finish grading under this section shall be completed in accordance with the grades indicated on the landscape drawings.
3.2 STRIPPING AND STOCKPILING OF EXISTING TOPSOIL
A. Excavation Areas: The native topsoil shall be stripped and stockpiled on-site in sufficient quantities to provide a six-inch layer throughout all in-ground planting areas and to backfill raised planters, including the ADA planter. Topsoil to be stripped and stockpiled shall be taken from the surface layer after all organic litter and foreign debris has been removed and properly disposed.
B. Existing Grade Unchanged: In those areas where grades are not proposed to be modified (areas of no excavation or fill) the native topsoil shall be left in place.
All debris, as well as all rocks over 0.75 inches in diameter, shall be removed from the surface of planting areas.
3.3 SUBSOIL AND TOPSOIL PLACEMENT
A. A mixture of topsoil and subsoil shall be used for backfill beneath the hardware cloth in box. Only topsoil shall be utilized as backfill for raised planters. 1065
CC 01-17-2023
1065 of 1241
LANDSCAPE SOIL PREPARATION 31 92 13
Wilson Park Community Garden
319213_LandscapeSoilPreparation.doc © copyrighted 2022 Callander Associates Landscape Architecture, Inc.
Stockpiled excavated sub-soil shall be placed in three-inch layers to depths shown on drawings. Next, three-inch layers of topsoil shall be uniformly distributed over all planters and thoroughly incorporated into the top six inches of subsoil by ripping, scraping, or tilling to mix the stockpiled subsoil with the native subsoil into a homogeneous mixture.
A. Existing Topsoil to Remain: In those planting areas where native topsoil is to be left in place, cross rip to a depth of ten inches. Then incorporate the amendments to a homogeneously blended soil depth of six inches.
3.4 ORGANIC AMENDMENT AND FERTILIZER INCORPORATION
(The following recommendation is for bidding purposes only. Refer to the horticultural soils report for actual quantities and fertilizers.)
A. Materials and Rates: Materials determined from the soils test shall be uniformly distributed throughout all irrigated planting areas and incorporated to a homogeneously blended soil depth of twelve inches per raised planter. Assume per eighteen cubic yards of native topsoil the addition of:
6 cubic yards nitrogen stabilized organic amendment
30 pounds commercial fertilizer (6-20-20)
10 pounds iron sulfate
Note: Iron sulfate should be applied cautiously, avoiding contact with concrete, since permanent staining may result. Any such stained concrete shall be replaced at Contractor’s expense.
3.5 PLANT PITS
A. Plant Pit Preparation: Plant pits shall have their sides and bottoms loosened or otherwise broken to prevent glazed or compacted surfaces, and shall be as shown on the planting detail.
3.6 BACKFILL
A. Backfill Material and Placement: Only unamended soil shall be used beneath the root ball; cultivate bottom of plant pit to improve porosity. Backfill around sides of rootball shall be the amended soil taken from adjacent prepared areas.
Spread material excavated from plant pits onto adjacent areas as replacement.
Should additional backfill be necessary, a mixture of one-third organic amendment/fertilizer mix and two-thirds topsoil may be used.
3.7 PLANT TABLETS
1066
CC 01-17-2023
1066 of 1241
LANDSCAPE SOIL PREPARATION 31 92 13
Wilson Park Community Garden
319213_LandscapeSoilPreparation.doc © copyrighted 2022 Callander Associates Landscape Architecture, Inc.
A. Tablet Quantities: All container plants shall receive plant tablets as follows:
five-gallon plants five 21-gram tablets
Space the tablets evenly around the root ball halfway up backfill touching side of root ball. City’s Representative may require excavation of up to 5% of all plants selected at random for conformance review.
3.8 FINISH GRADING
A. Grading Operations: Contractor shall finish grade all irrigated planting areas unless otherwise noted, and shall remove all rocks and clods over one cubic inch to a depth of one inch below finish grade. All areas shall be smooth and uniformly graded. All erosion damage during the construction period shall be repaired by the Contractor.
B. Finish Grades: Unless otherwise noted, all soil finish grades shall be one inch below finish grade of walks, pavements, and curbs.
END OF SECTION 31 92 13
1067
CC 01-17-2023
1067 of 1241
LANDSCAPE MAINTENANCE 32 01 90
Wilson Park Community Garden
320190_LandscapeMaintenance
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 01 90 LANDSCAPE MAINTENANCE
PART 1 - GENERAL
1.1 SCOPE
A. Work in this section includes the growing and maintenance operations necessary to establish the newly planted shrubs, and other plantings; to provide insect, rodent and disease control, and to maintain the irrigation system, and related construction elements.
B. Related work specified elsewhere:
1. Irrigation - Section 32 84 00
2. Landscape Soil Preparation – Section 31 92 13
3. Planting - Section 32 93 00
1.2 SUBMITTALS
A. Soil Testing: Contractor shall collect one one-quart samples in the container planting areas of the in-place topsoil 20 days after completion of planting and submit to Waypoint Analytical, Inc. of Anaheim, (714) 282-8777, or approved equal, for maintenance period fertilizer recommendation. Test results shall be made available to the City’s Representative. Sample shall be a representative composite taken from several planting areas. Cost of soil test shall be paid for by the Contractor.
B. Herbicide/Fungicide/Insecticide: Submit a written recommendation from a State of California appropriately licensed individual along with complete product data from proposed manufacturer, for review by City Inspector and/or City’s appropriately licensed individual.
1.03 SCHEDULE
A. Work in this section will not begin until the irrigation audit is complete.
B. Maintenance and Warranty Period: Shall be per General Conditions.
C. Maintenance period shall be for a minimum period of thirty (30) calendar days after pre-final inspection.
1068
CC 01-17-2023
1068 of 1241
LANDSCAPE MAINTENANCE 32 01 90
Wilson Park Community Garden
320190_LandscapeMaintenance
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Fertilizer: Used during the course of the maintenance period shall be determined by soils test required under Part 1 of this Section and that are on the list below.
For bidding purposes only, assume the use of ammonium sulfate (21-0-0) at 5 lbs. per 1000 SF, minimum of two applications.
1. Organic Materials Review Institute’s Generic Materials List
2. California Department of Food and Agriculture’s Organic Input Materials
3. U.S. Department of Agriculture’s National Organic Program B. Water: During the course of construction and maintenance period water shall be paid for by the Contractor.
C. Herbicide/Fungicide/Insecticide: Shall be a commercially available chemical recommended for this project and these plantings by a State of California appropriately licensed individual. The licensed individual shall review all planting, including but not limited to seed, sod, groundcovers, shrubs, and trees, the types and extent of soil preparation, the irrigation systems, drainage patterns, and other project characteristics to verify type, compatibility, and recommend the appropriate chemical(s) for use. Contractor shall be responsible for all overspray, spreading, runoff, plant health, and other impacts from the use of the chemical(s).
PART 3 - EXECUTION
3.1 TIME LIMITS: The maintenance period shall commence from the date of substantial completion of planting as defined in paragraph 3.6 below, and extend for a 30-day period thereafter, or until the acceptance of Final Completion.
3.2 FERTILIZER APPLICATION: Fertilizer(s) shall be applied per Waypoint Analytical, Inc. recommendations. For bidding purposes, assume initial application to be four weeks after planting and subsequent applications to be at 45-day intervals.
3.3 HERBICIDE APPLICATION: Herbicide shall not be used until all plant material has been planted a minimum of 20-days. All planting areas shall be kept weed-free by non-herbicide methods during this time period. Herbicide shall not be applied to any areas that are or have been seeded. Contractor must apply the material in conformance with the written recommendations of the State appropriately licensed individual. 1069
CC 01-17-2023
1069 of 1241
LANDSCAPE MAINTENANCE 32 01 90
Wilson Park Community Garden
320190_LandscapeMaintenance
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
3.4 BASIC REQUIREMENTS: All planting areas shall be kept weed-free at all times during the maintenance period. All pest and disease control shall be the Contractor’s responsibility.
All planting areas shall be kept at optimum moisture for plant growth. Settlement of soil and plants and soil erosion shall be repaired and areas replanted as required. Dying or deficient plants shall be replaced as soon as they become apparent.
3.5 CITY’S RESPONSIBILITY: Work installed under this contract that is damaged or stolen prior to written notice of Substantial Completion shall be repaired or replaced by the Contractor without cost to the City. After Substantial Completion and through the maintenance period, these damages and similar factors such as extensive litter, abuse and defacement shall be the City’s responsibility to repair or replace and shall not be a part of this contract. No planting shall be guaranteed beyond the maintenance period, except as to conformance to specified species and variety, and except as to conditions specified under "Root Systems" of Landscape Planting, Section 02934.
3.6 SUBSTANTIAL COMPLETION: Shall be deemed as the time all major plantings, including groundcover, are installed, and when all other work is satisfactorily completed (with the exception of minor items to be completed as noted upon a checklist compiled by the City’s Representative). Maintenance period shall not commence until work is deemed substantially complete by the City’s Representative.
3.7 FINAL REVIEW: Contractor shall request a final review of the project at least five days in advance of the proposed date. Failure to request this notice shall automatically extend the date of completion. The maintenance period will continue until project is deemed complete.
END OF SECTION 32 01 90
1070
CC 01-17-2023
1070 of 1241
ASPHALT PAVING 32 12 16
Wilson Park Community Garden
321216_AsphaltPaving.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 12 16 ASPHALT PAVING
PART 1 - GENERAL
1.1 SCOPE
A. Work in this section includes the installation and furnishing of all aggregate base, asphaltic concrete (a.c.) paving, and related work thereto.
B. Related work specified elsewhere:
1. Earthwork and Grading - Section 31 22 00
1.2 STANDARDS
A. Unless otherwise shown or specified, all materials and methods shall conform to the cited sections of the most current State of California, Department of Transportation Standard Specifications (DTSS).
1.3 SUBMITTALS
A. Soil Sterilant: Submit written recommendation from a State of California appropriately licensed individual along with complete product data from proposed manufacturer, for review by the City’s appropriately licensed individual.
B. Aggregate Base: Submit laboratory reports for aggregate gradation, durability, sand equivalency, and other requirements conforming to DTSS Section 26, for review by City Inspector.
C. Asphalt Pavement: Submit proposed mix design as prepared by mixing plant and other requirements conforming to DTSS Section 39-2, for review by City Inspector.
1.4 TOLERANCES
A. Tolerances for subgrade, subbase and finished grade shall be as specified by DTSS Section 19 Earthwork except that Contractor shall deliver the full aggregate base and asphaltic concrete thickness shown. No combination of high and low tolerances that compromise the section will be permitted. 1071
CC 01-17-2023
1071 of 1241
ASPHALT PAVING 32 12 16
Wilson Park Community Garden
321216_AsphaltPaving.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
1.5 TESTING AND INSPECTION
A. Contractor shall notify the City’s Representative at the completion of the various stages of the operation as indicated below and shall allow two (2) working days for testing operations prior to proceeding with subsequent construction.
1. After all rough grading is complete and subgrade has been prepared to receive aggregate base (insert (and/or subbase) if there is import fill on the site).
2. After final placement and compaction of aggregate base or subbase and subgrade has been prepared to receive asphalt prime or other following operation.
3. When paving equipment is at the site and paving operation is ready to start.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Soil Sterilant: Shall be a commercially available herbicide material recommended for this project by a State of California appropriately licensed individual. The licensed individual shall review the type of construction, soils, base, adjacent plantings, time and season of application, and other project requirements; verify compatibility; and recommend procedures for proper application. Contractor shall be responsible for all overspray, spreading, or runoff of material into adjacent areas.
B. Aggregate Base: DTSS Section 26, Class 2, with 3/4 inch maximum size.
C. Liquid asphalt for prime coat: DTSS Section 94.
D. Asphaltic emulsion for tack coat: DTSS Section 94, SS1h.
E. Asphalt Binder: DTSS Section 92, performance graded asphalt binder, PG 64-10 or PG-64-16.
F. Mineral aggregates for HMA Types A & B plant-mixed asphalt: DTSS Section 39-2, maximum size 1/2 inch, medium gradation.
2.2 MIXES
1072
CC 01-17-2023
1072 of 1241
ASPHALT PAVING 32 12 16
Wilson Park Community Garden
321216_AsphaltPaving.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
A. Proportioning and mixing of the asphaltic concrete shall conform to DTSS Section 39-2.
PART 3 - EXECUTION
3.1 PREPARATION
A. Verify that the subbase is properly compacted and at suitable grade for receiving aggregate base. Clear area to be paved of all debris and organic material.
Recompact and regrade as necessary to place aggregate base.
B. Before beginning base and paving work and during construction, take all steps necessary for protection of existing improvements. As the asphalt concrete is being placed, extreme care shall be taken not to discolor or damage the curbs, fences, or wall surfaces. If damage occurs, repair, and if satisfactory repair cannot be made, remove and replace the section as directed.
C. Dispose of all excavated material as described in the Demolition Section 02 41 13 of the Technical Specifications.
3.2 INSTALLATION
A. Soil Sterilant: Shall be applied to the subgrade soil of areas to be paved prior to baserock operations; uniformly applied according to the label. Contractor shall take all precautions necessary to avoid overspray, spreading, or runoff of material into adjacent areas.
B. Place and compact aggregate base as specified for Class 2 aggregate base in DTSS Section 26-1.03. Verify grades to allow for finish paving.
C. Clear aggregate base surface of all loose or unsuitable material. Apply prime coat in accordance with DTSS Section 94 and at a rate of 0.25 gallons per square yard.
After the liquid asphalt has penetrated the surface, the excess shall be removed with sufficient sand to absorb the excess liquid asphalt. Remove excess sand.
D. Apply tack coat in accordance with DTSS Section 39-2. Tack coat shall be applied in one application to existing pavement and planed surfaces and all vertical surfaces of existing pavement, curbs, gutters, catch basins, and construction joints, and other surfaces designated by the City’s Representative. The tack coat shall be provided in sufficient quantity to produce a thin, uniform black, glossy coat of asphalt. Pools in unevenly distributed areas shall be redistributed by means of hand brooms.
1073
CC 01-17-2023
1073 of 1241
ASPHALT PAVING 32 12 16
Wilson Park Community Garden
321216_AsphaltPaving.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
E. Before placing surfacing, additional prime coat or tack binder shall be applied to areas where the prime coat or tack coat has been destroyed.
F. Asphalt concrete shall be transported, spread and compacted uniformly to a closed, smooth surface and a layer of uniform density, in accord with DTSS Section 39-2.
G. Finish grades shall be as indicated, smooth and without sharp breaks and shall allow the pavement to drain. Upon completion of the paving, flood the area as directed by the City’s Representative. The Contractor shall be required to reconstruct any low areas as directed. Finish grades that allow ponding or puddling of water will not be accepted.
3.3 CLEAN UP
A. Upon completion of the work under this section, remove immediately all surplus materials, rubbish and equipment associated with or used in the performance of this work. Failure to perform such clean-up operations shall be considered adequate grounds for having the work done by others at the Contractor’s expense.
END OF SECTION 32 12 16
1074
CC 01-17-2023
1074 of 1241
SITE CONCRETE 32 13 13
Wilson Park Community Garden
321313_SiteConcrete
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 13 13 SITE CONCRETE
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all concrete as shown and specified. This work includes, but is not necessarily limited to concrete pavement, threshold, footings, and miscellaneous items.
B. Related work specified elsewhere:
1. Earthwork and Grading - Section 31 22 00
1.2 STANDARDS
A. Unless otherwise shown or specified, all materials and methods shall conform to the appropriate current sections of:
1. The State of California, Department of Transportation Standard Specifications (DTSS) sections 52, 73 and 90 except for measurement and payment requirements.
2. Applicable ASTM Specifications as they reasonably apply to this work, except for measurement and payment requirements.
3. American Concrete Institute (ACI), current standards.
1.3 TOLERANCES
A. Tolerances for subgrade, subbase and finished grade shall be as specified by DTSS except that Contractor shall deliver the full aggregate base and concrete thickness shown. No combination of high and low tolerances that compromise the section will be permitted.
B. Concrete Final Finishes: The Contractor shall demonstrate to the satisfaction of the City and the Owner’s Representative that he, or his subcontractor, possesses sufficient skills and experience to perform the work. Photographs and/or site visits of past work may be required to supply this information. A 3’x3’ sample of the broom finish concrete pavement shall be poured and finished at the site for City’s review prior to commencing concrete pouring. Once the samples have been reviewed, the Contractor shall meet or exceed that quality of finish in all subsequent work. Contractor shall be responsible for removal of the samples at the completion of the work.
1075
CC 01-17-2023
1075 of 1241
SITE CONCRETE 32 13 13
Wilson Park Community Garden
321313_SiteConcrete
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
C. Submittals: The following shall be submitted by the Contractor to the Engineer in accordance with the applicable portions of the referenced specifications:
1. The proposed mix design, giving the brand of cement, type, gradations and source of aggregates, water/cement ratio, mix proportions, and unit weight.
2. Manufacturer’s literature for admixtures, embedded items, liquid membrane-form curing compound and non-shrink grout.
3. Certification that materials are in compliance with specification requirements.
4. Method of transporting and placing concrete.
1.4 JOB CONDITIONS
A. Weather Limitations: Construct concrete surface course only when atmospheric temperature is above 40 degrees F., when the underlying base is dry, and when weather is not rainy.
B. Grade Control: Establish and maintain the required lines and grades, including cross-slope during construction operations. All concrete shall slope to drain with no ponding of water.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Forms and Reinforcing: Per section 52.
B. Concrete: Shall conform to Section 90 of the DTSS “Minor Concrete”.
1. Cement: Type II modified conforming to ASTM-C-150-02a.
2. Aggregate: Shall not be less than 3/8” or more than 1 inch in size.
3. Compression strength at 28 days to be a minimum 3,000 p.s.i.
C. Color Admixture:
1. Add Hi-con black at a rate of 1/8 lb. per sack.
D. Cleaning Agents: As required.
E. Aggregate Base: Class II per (DTSS).
F. Expansion Joint Filler: Shall be “Fibre” Joint, manufactured by W.R. Meadows Seal Tight and conforming to ASTM D-1571, or approved equal. 1076
CC 01-17-2023
1076 of 1241
SITE CONCRETE 32 13 13
Wilson Park Community Garden
321313_SiteConcrete
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clear area to be paved of all debris and organic material. Recompact and regrade as necessary prior to placement of concrete. Verify that the subgrade and/or aggregate base is properly compacted and at suitable grade.
B. Before beginning paving work and during construction, take all steps necessary for protection of existing improvements. As the concrete is being placed, extreme care shall be taken not to discolor or damage any improvements. If damage occurs, repair same, and if satisfactory repair cannot be made, remove and replace the section as directed.
C. Formwork and Reinforcement:
1. Assure that excavations and formwork are completed.
2. Check that reinforcement is secured in place.
3. Verify that anchors, expansion joint material, and other embedded items are secured in position.
3.2 INSTALLATION
A. Finishes
1. Broom Finish: Provide a light broom finish with strokes perpendicular to direction of travel along walks and parallel to length of threshold.
3.3 CLEAN UP: Upon completion of the work under this section, remove immediately all surplus materials, rubbish, and equipment associated with or used in the performance of this work.
END OF SECTION 32 13 13
1077
CC 01-17-2023
1077 of 1241
DECOMPOSED GRANITE PAVING 32 15 40
Wilson Park Community Garden
321540_DecomposedGranitePavement.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 15 40 DECOMPOSED GRANITE PAVING
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all stabilized decomposed granite paving as shown and specified.
B. Related work specified elsewhere:
1. Earthwork and Grading – Section 31 22 00
2. Site Concrete - Section 32 13 13
1.2 QUALITY CONTROL
A. Standards: Unless otherwise shown or specified, all materials and methods shall conform to the appropriate current sections of:
1. The State of California, Department of Transportation Standard Specifications (DTSS) Section 20-5.
2. Applicable ASTM Specifications as they reasonably apply to this work.
B. Tolerances: Tolerances for subgrade, subbase, and finish grade shall be as specified by DTSS except that Contractor shall deliver the full decomposed granite thickness shown. No combination of high and low tolerances that compromise the section will be permitted.
1.3 SUBMITTALS
A. Soil Sterilant: Submit written recommendation from a State of California appropriately licensed individual along with complete product data from proposed manufacturer, for review by City Inspector and/or City’s appropriately licensed individual.
B. Decomposed Granite: A one-quart sample with supplier and source clearly indicated of decomposed granite to be used shall be submitted to the City’s Representative for approval prior to delivery to the site.
C. Mixing Facilities: Method or supplier source for paving product shall be submitted to the Engineer with sufficient notice so inspection of batching and mixing operations can be made.
1078
CC 01-17-2023
1078 of 1241
DECOMPOSED GRANITE PAVING 32 15 40
Wilson Park Community Garden
321540_DecomposedGranitePavement.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
D. Stabilizer: Submit product data.
E. Reviews: Contractor shall stake and layout all paving areas for review by the City’s Representative prior to excavation.
F. Samples: The Contractor shall demonstrate to the satisfaction of the City’s Representative that he or his subcontractor possesses sufficient skills and experience to perform the work in all aspects required. A five-square-foot sample of decomposed granite paving shall be installed at the site for review and approval by the City’s Representative. The Contractor shall meet or exceed that quality of work in all subsequent work. Contractor shall be responsible for the removal of the sample at the completion of work.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Soil Sterilant: Shall be Preen Natural Vegetable Garden Weed Preventer or approved equal, produced by Lebanon Seaboard Corporation, 1-800-233-1067, as available from Home Depot. Soil sterilant shall be suitable for use in crop and edible gardens. Sterilant shall prevent weeds by bonding with the soil and preventing weed seeds from forming roots. The ingredients shall biodegrade into soil elements and shall not harm humans, animals, or water sources.
B. Decomposed Granite: Decomposed granite, hereafter referred to as “DG”, shall be Gold Track Fines as available from TMT Inc. 1996 Oakland Rd, San Jose, CA 95131-1696, (408) 432-9040, or approved equal. Material must also conform to the following:
Sieve Size Percent Passing
3/8” 100%
No. 4 85% - 95%
No. 8 75% - 95%
No. 30 35% - 55%
No. 20 10% - 20%
The yellow-brown color, inherent to Gold Track Fines type DG, is a requirement for this material. The contractor shall obtain the approval of the Engineer in writing of the DG he proposes to use, prior to delivery to the site. 1079
CC 01-17-2023
1079 of 1241
DECOMPOSED GRANITE PAVING 32 15 40
Wilson Park Community Garden
321540_DecomposedGranitePavement.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
C. Stabilizer: Stabilizer shall be PHP Organic Aggregate Binder, or equal, and added to the DG at the rate of 15 lbs per ton of DG.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Soil Sterilant: Shall be applied to the subgrade soil of areas to be paved prior to paving operations; uniformly applied per manufacturer's recommendations; minimum rate of 20 lbs./1000 square feet and watered with a minimum of 3 gallons/100 square feet. Contractor shall take all precautions necessary to avoid spray onto or runoff into planting areas or other surfaces.
B. Immediately prior to placing the decomposed granite, the subgrade shall be moistened. The decomposed granite shall be deposited in such a manner as to minimize the necessity for spotting, picking up, or otherwise shifting the decomposed granite. The decomposed granite shall be leveled by raking and compacted by use of a light roller.
C. Fill in any low spots or cracks with additional decomposed granite.
D. Finished surface of decomposed granite pavement shall meet ADA compliant standards of firmness and stability per CBC 11B-302.
3.2 GRADES
A. The finish grades of the decomposed granite paving shall conform to the lines and grades on the drawings and allow for drainage.
3.3 CLEAN-UP
A. All waste produced as a result of decomposed granite paving construction shall be removed from the site and disposed of legally. All excess decomposed granite shall be removed from planting areas.
END OF SECTION 32 15 40
1080
CC 01-17-2023
1080 of 1241
SITE FURNISHINGS 32 33 00
Wilson Park Community Garden
323300_SiteFurnishings.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 33 00 SITE FURNISHINGS
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all site furnishings, including but not necessarily limited to, benches, tables, entry sign, storage shed, and ADA raised planters.
B. Related work specified elsewhere:
1. Irrigation - Section 32 84 00
2. Site Concrete - Section 32 13 13
3. Carpentry - Section 06 40 00
1.2 ACCEPTANCE: Prior to the purchase of the items and within five days of the award of the contract, the Contractor shall supply the Owner’s Representative with samples of the finishes for approval by the City. No materials for this section shall be purchased until such approval is granted.
1.3 CERTIFICATION: Delivery schedules shall be verified and certified in writing to the Owner’s Representative within ten days after the project commences.
1.4 SUBMITTALS: Submit catalog information for items:
A. Bench
B. Table
C. Entry Sign
D. Occupancy Sign
E. Storage Shed
F. ADA planter
G. Rain Chain
H.
PART 2 – PRODUCTS
2.1 MATERIALS
A. Bench: Shall be Dumor Bench 34, 6’ length, IPE, metal parts to be powder coated black, with end and center armrests, surface mounted, as available from Ross Recreation, 100 Brush Creek Road, Suite 206, Santa Rosa, CA 95404, (855) 892- 3240, or approved equal.
1081
CC 01-17-2023
1081 of 1241
SITE FURNISHINGS 32 33 00
Wilson Park Community Garden
323300_SiteFurnishings.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
B. Table: Shall be Dumor Table 75, 8’ length, Douglas Fir, ADA, surface mounted, as available from Ross Recreation, 100 Brush Creek Road, Suite 206, Santa Rosa, CA 95404, (855) 892-3240, or approved equal.
C. Entry Sign: Per plans.
D. Occupancy Sign: Per plans.
E. Storage Shed: Shall be Tuff Shed, Premier Ranch, 8’Lx8’Wx8’10”H, Double Shed Door 3’x6’-2”, 16”x8” Wall Vent white color, Autumn Brown 3 Tab Roof, as available from Tuff Shed, 3590 Snell Ave, Suite 20, San Jose, CA 95136, (408) 935- 8833, or approved equal. One (1) year minimum warranty period.
1. Paint: Siding Paint shall be Diamond Dust KM5297, Trim Paint shall be Aegean Mist KM4977, as available from Kelly-Moore Paints, or approved equal.
F. ADA raised planter: ADA Compliant Outdoor Raised Garden Bed – Red Cedar – 47” L x 45” W x 24” to 30” H, finish to be natural, unpainted finish, as available from Accessible Gardens, 2 Cleo Court, Westerly, RI, 02891, (401) 290-7870, or approved equal. All posts to be surface mounted to concrete footings.
G. Rain Chain: Per plans.
PART 3 - EXECUTION
3.1 LAYOUT: Prior to commencing installation, Contractor shall stake layout and request a review by the Owner’s Representative to determine adjustments on site from locations shown on drawings.
3.2 INSTALLATION:
A. All site accessories shall be installed per manufacturer's specifications.
END OF SECTION 32 33 00
1082
CC 01-17-2023
1082 of 1241
IRRIGATION 32 84 00
Wilson Park Community Garden
328400_Irrigation
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 84 00 IRRIGATION
PART 1 - GENERAL
1.1 SCOPE
A. Work in this section includes installation of a garden watering system and automatic irrigation system, including excavation for points of connection, trenching, piping, equipment, electrical components and incidentals related thereto.
B. Related work specified elsewhere:
1. Trenching and Backfilling – Section 31 23 00
1.2 QUALITY CONTROL
A. Standards: Unless otherwise shown or specified, all materials and methods shall conform to section 20-2 of the State of California Department of Transportation Standard Specifications (DTSS) as they reasonably apply to this work except for measurement and payment requirements.
B. All irrigation shall be provided and performed in accordance with the current City of Cupertino Standard Details. Wherever these plans and the City Standards conflict, the higher quality standard or specification will apply.
C. Reviews: Contractor shall specifically request the following reviews prior to progressing with the work:
1. Layout of system.
2. Points-of-connection excavation.
3. Trenching and pipe assembly.
4. Coverage adjustment of all heads and valve box installation.
5. Operation of system.
6. Final Completion
PART 2 - PRODUCTS
2.1 MATERIALS
A. Quality: All materials shall be new and the best quality available unless otherwise specified. All materials shall be clearly marked by manufacturer on all material, containers, or certificates of contents for inspection. 1083
CC 01-17-2023
1083 of 1241
IRRIGATION 32 84 00
Wilson Park Community Garden
328400_Irrigation
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
B. Plastic Pipe and Fittings: All mainline pipe shall be polyvinyl chloride (PVC) Schedule 80, all laterals shall be Class 200 PVC pipe; solvent weld fittings, if used, shall be Schedule 40, or Schedule 80 as called for on details. Solvent for piping shall be as recommended by manufacturer. All pipe shall be clearly labeled with manufacturer type and specification numbers.
C. Control Wire: Type UF, 600 v. insulation, minimum size #14, copper, common to be white, valve control wire to be red or black, U.L. approved for irrigation control use; splices shall be "Scotch-Lok" seal pack, or equal.
D. Valve Boxes: Precast concrete or plastic of type and size indicated; free of all cracks, chips or structural defects. Boxes located in pavement (asphalt or concrete) and/or subject to vehicular traffic shall be concrete and have heavy duty steel covers. Boxes shall be sized to provide a 4” minimum clearance around the irrigation equipment inside the box, excluding all pipes and fittings.
E. Irrigation Equipment: Refer to drawings. Any desired substitutions require submittals in duplicate for specific written approval.
F. Thread Sealant: Permatex Thread Sealant, part #14H, white in color.
G. Submeter: Shall be Neptune T-10 meter, measuring in CCF, 2” size, or approved equal. Install per manufacturer’s recommendations.
H. Shrub bubbler: Rainbird 1401 series, 1 bubbler per shrub, or approved equal.
I. Hose Bibb: Dramm 22319 ¾” brass twin shut off valve, or approved equal.
J. Hose Hanger: Hampton Bay heavy-duty wall-mounted hose hanger, 12-gauge steel with powder coated tan color finish, as available from The Home Depot.
PART 3 - EXECUTION
3.1 GRADING: Contractor shall be responsible for installing all irrigation features to their finished grade and at depths indicated. All rough grading shall be completed before trenching commences.
3.2 LAYOUT AND TRENCHING: All features of the irrigation system shall be staked and pipe alignments marked prior to trenching for review by the Engineer.
3.3 BACKFILLING: Do not cover joints until system has been reviewed by the Engineer.
Backfill with damaging rocks and debris shall not be permitted. Compact all backfill and 1084
CC 01-17-2023
1084 of 1241
IRRIGATION 32 84 00
Wilson Park Community Garden
328400_Irrigation
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
eliminate settlement. Previously prepared soil is to be replaced as the top six inches of backfill.
3.4 FABRICATION: Snake pipe from side to side when trench exceeds thirty feet in length. All manifolds shall be neat, orderly, and constructed for ease in maintenance operations.
Construct manifolds to allow valve boxes to be parallel to each other and to adjacent walls, walks, curbs, and buildings. Cuts and joints shall be free of burrs, smooth, and minimum in quantity. All pipe above finish grade shall be galvanized unless noted otherwise.
3.5 PIPELINES: All pipelines shown parallel on the drawing may be installed in a common trench. Where pipelines are shown parallel or adjacent to shrub or groundcover areas, they shall be installed in these areas. All changes in depth of pipe shall be accomplished using 45-degree fittings.
3.6 TESTING: Test mainline at 125 psi for a minimum of eight (8) hours prior to backfill of any irrigation system elements. No signs of leaking shall be considered acceptable. Test and repair as necessary until satisfactory test conditions are obtained.
3.7 CONTROL WIRE: Install control wire in pipe trenches wherever practical. Tape to underside of pipe every ten feet. Loop wire every 20 feet. Splices shall occur in valve boxes only and shall be accomplished utilizing approved connectors. All wire shall be installed below or level with the bottom of adjacent pipes. All wiring above finish grade shall be enclosed in steel conduit. Splices shall be installed in junction boxes.
3.8 FINISH GRADE: Unless otherwise noted, all heads shall be set at finish grade and on double or triple swing joints as called for on drawings. The top of all valve boxes shall be flush with finish grade.
3.9 RECORD DRAWING: Contractor shall regularly update a print of the system and any changes made to the system throughout the project. Features below ground shall be indicated with at least two measurements from surface features such as walks, building, or sprinkler heads. All changes shall be recorded on this plan before trenches are backfilled. The record drawing shall be completed and submitted to City before final payment shall be made for work installed.
3.10 FINAL REVIEW: Contractor shall request a final review of the project at least five days in advance of the proposed date. Failure to request this notice shall automatically extend the date of completion.
END OF SECTION 32 84 00
1085
CC 01-17-2023
1085 of 1241
PLANTING 32 93 00
Wilson Park Community Garden
329300_Planting.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
SECTION 32 93 00 PLANTING
PART 1 - GENERAL
1.1 SCOPE
A. Furnish and install all container plantings, mulch, header board, and related work thereto.
B. Related work specified elsewhere:
1. Landscape Soil Preparation - Section 31 92 13
2. Landscape Maintenance - Section 32 01 90
1.2 REFERENCES
A. Interpretations of plant names and descriptions shall reference the following documents. Where the names or plant descriptions disagree between the several documents, the most current document shall prevail.
1. USDA – The Germplasm Resources Information Network (GRIN) http://www.ars-grin.gov/npgs/searchgrin.html
2. Manual of Woody Landscape Plants; Michael Dirr; Stipes Publishing, Champaign, Illinois; most current edition.
3. New Sunset Western Garden Book, Oxmoor House, most current edition.
B. ANSI American Standard for Nursery Stock
C. Federal, State, and County laws requiring inspection for plant disease and insect control.
1.3 QUALITY CONTROL
A. Reviews: The Contractor shall specifically request the following reviews prior to progressing with the work:
1. Plant material approval
2. Plant layout
3. Finish grade
4. Substantial completion
5. Final completion
1086
CC 01-17-2023
1086 of 1241
PLANTING 32 93 00
Wilson Park Community Garden
329300_Planting.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
1.4 SUBMITTALS
A. Plant Material: Within ten (10) days after award of contract, Contractor shall submit notice to the City’s Representative certifying the quantity and species of plant material ordered, the nursery supplying the material, any plant material unavailable at the time, and proposed plant substitutions. No plants shall be ordered or delivered prior to written acceptance by the City Representative.
B. Mulch: Name of supplier and one quart-sized sample.
C. Certificates: All plant materials shall meet the specifications of Federal, State, and County laws requiring inspection for plant diseases and insect infestations.
Inspection certificates required by law shall accompany each shipment, invoice, or order of stock, and when such plants arrive at the site of work, the certificate of inspection shall be filed with the City’s Representative.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Nomenclature and Labels: Plant botanical names shall conform to current literature noted in section 1.2. All plants of each clone, species, and cultivar shall be delivered to the site labeled with their full botanical names. Every plant species shall be labeled with no less than one label for every ten plants of a species.
B. Quality: Minimum quality of all plant material shall conform to prevailing published specifications of the California Association of Nurserymen and the American Association of Nurserymen’s American Standard for Nursery Stock unless otherwise indicated. Additional specifications shall be indicated on the drawings.
C. Quantities: The quantities shown on the plant list and in labels are for the City’s Representative’s use and are not to be construed as the complete and accurate limits of the contract. Contractor shall furnish and install all plants shown schematically on the drawings. Any unlabeled plants shall be considered as the smaller size shown for that type on the drawings.
D. Root Systems: All container-grown stock shall be grown in its container for at least six months prior to its planting. Contractor shall allow one percent of the 1087
CC 01-17-2023
1087 of 1241
PLANTING 32 93 00
Wilson Park Community Garden
329300_Planting.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
quantity of plants for removal and inspection. Any plant material, within one year following the final acceptance of the project, determined by the City’s Representative to be defective, restricted, declining or otherwise deficient due to abnormal root growth, shall be replaced by Contractor to the equal condition of adjacent plants at the time of replacement.
E. Health: Foliage, roots and stems of all plants shall be of vigorous health and normal habit of growth for its species. All plants shall be free of all diseases, insect stages, burns, or disfiguring characteristics.
F. Untrue Species: All plant material, within two years following the final acceptance of the project, determined by the City’s Representative to be untrue to the species, clone, and/or variety specified, shall be replaced by the Contractor, to the equal condition of adjacent plants at the time of replacement.
G. Mulch: Except as otherwise noted below, mulch shall be walk-on bark, free of disease, invasive weeds and seeds. Available from Lyngso Garden Materials, 345 Shoreway Road, San Carlos, CA 94070, (650)364-1730). Maximum 3” grind.
H. Headerboard: Shall be per plans.
PART 3 - EXECUTION
3.1 GENERAL
A. Plant Material Approvals: Before planting operations commence, all or a representative sampling of plant material shall be reviewed at the site by the City’s Representative. Defective plants installed without such review shall be removed from the site upon request by the City’s Representative and an acceptable plant substituted in its place.
B. Storage and Handling:
1. Plant materials shall be protected and maintained in good condition.
Bare root and balled materials shall be watered regularly and placed in a cool area. Plant material shall be protected at all times from animal damage, vandalism, drought damage, wind damage, frost damage, toxic irrigation water, or any other condition that would damage or reduce the viability of the plants. Plants shall be kept moist at all times and shall be completely watered twelve (12) hours or less before planting and shall be moist when installed.
1088
CC 01-17-2023
1088 of 1241
PLANTING 32 93 00
Wilson Park Community Garden
329300_Planting.doc
© copyrighted 2022 Callander Associates
Landscape Architecture, Inc.
C. Layout: Only those plants to be planted in any single day shall be laid out.
Locations of all plants shall be reviewed prior to planting. Plants installed without this review shall be transplanted as directed by the City’s Representative.
D. Protection of Plants: Contractor shall maintain all plant material in a healthy growing condition prior to and during planting operations. Contractor shall be responsible for vandalism, theft and damage to plant material until the commencement of the maintenance period.
E. Root Systems: Contractor shall be responsible for inspection of all root systems on plant materials. Inspection shall include, but not be limited to, checking for rootbound stock, encircling roots at the perimeter of the container, evidence of girdling roots, and other defective root conditions. Such inspections shall include the complete removal of soil from one percent of plant material containers, or at least one plant from each nursery and each plant type. Contractor shall cut defective or potentially defective girdling, rootbound, and encircling roots and spread the root system into the surrounding backfill. Plants with excessively defective root systems shall be rejected by the Contractor.
F. Pruning: Contractor shall do no pruning without the specific approval of the City’s Representative. Plants pruned without approval shall be replaced by the Contractor, if required.
G. Basins: Construct basins as necessary to water plants. Remove basins from all plants under a permanent irrigation system prior to final inspection and finish grade the planting area. Basins for plants to be hand-watered shall remain in place. Basin bottoms shall drain to berm away from plant stem.
H. Plant Pits, Backfill and Finish Grading: See Soil Preparation Section 31 92 13 for materials and installation requirements.
I. Cleanup: After completion of all operations, Contractor shall remove all trash, excess soil and other debris. All walks and pavement shall be swept and washed clean, leaving the entire area in a neat, orderly condition.
END OF SECTION 32 93 00
1089
CC 01-17-2023
1089 of 1241
© T:\PROJECTS\2021 PROJECTS\21059_WILSONPARKCOMMUNITYGARDENCUPERTINO\3_CONSTRUCTIONDOCUMENTS\21059_CV.DWG
WILSON PARK
COMMUNITY GARDEN
PROJECT NO. 2020-01.1
CUPERTINO, CALIFORNIA
WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS
SITE MAP
LOCATION MAP
WILSON PARK
COMMUNITY GARDEN
CUPERTINO
CITY OF
EST.195
©
L1.0
PROJECT
LOCATION 1 L1.0 COVER SHEET
2 L1.1 NOTES
3 L2.0 DEMOLITION AND EROSION CONTROL PLAN
4 L2.1 EROSION CONTROL DETAILS
5 L3.0 GRADING AND DRAINAGE PLAN
6 L4.0 SITE CONSTRUCTION PLAN
7 L5.0 PLANTING AND IRRIGATION PLAN
8-12 L6.0-L6.4 CONSTRUCTION DETAILS
13 L7.0 BEST MANAGEMENT PRACTICES
SHEET INDEX
SHEET NO. TITLE DRAWING
PROJECT BASIS OF BEARING
PROJECT BENCHMARK
HORIZONTAL CONTROL POINT #1:
MAG NAIL ON ASPHALT PATH AT SOUTHWEST CORNER OF PROJECT SITE HORIZONTAL CONTROL POINT #2:
MONUMENT FOUND AT ON THE STREET AT THE CORNER OF
WINTERGREEN DRIVE AND S. PORTAL AVENUE
SEE SITE CONSTRUCTION PLAN, SHEET L5.0
2025 Gateway Place, Suite 285
San Jose, CA 95110
T 408.275.0565
www.callanderassociates.com
CALLANDER ASSOCIATES
LANDSCAPE ARCHITECTURE
CALA Project No. 21056
ELEV DATUM:
EXISTING MAG NAIL ON ASPHALT PATH AT SOUTHWEST CORNER OF PROJECT SITE, SEE GRADING AND DRAINAGE PLAN, SHEET L4.0 11/07/2022
Attachment D
1090
CC 01-17-2023
1090 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_CV.dwg Plot Date: 11/4/22 Saved By: Kkong Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com NOTES L1.1 1091
CC 01-17-2023
1091 of 1241
SD SD SD SD SD SD SD SD
TURF I I I I I I I I I I I I I I I I I I I I I I I
TR 4" PRV 4" BFP
SSMH
SSMH C C
SD
TR I WILSON PARK COMMUNITY GARDEN
DRAWN BY:
SHEET TITLE
SHEET
CHECKED BY:
SCALE:
PROJECT NO:
ISSUE DATE
2025 Gateway Place, Suite 285
San Jose, CA 95110
T 408.275.0565
DN
GH/MM
As Shown
21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DM.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc.
OF 13
REVISION DATECUPERTINO, CA
BID SUBMITTAL 06/08/22
www.callanderassociates.com
DEMOLITION AND
EROSION CONTROL
PLAN
L2.0
1092
CC 01-17-2023
1092 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com EROSION CONTROL DETAILS L2.1 4 1093
CC 01-17-2023
1093 of 1241
SD
SD
SD
SD SD SD
SD
SD
1203.33 MON
4 208.00 MAG
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_GD.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com GRADING AND DRAINAGE PLAN L3.0 1094
CC 01-17-2023
1094 of 1241
SD
SD
SD
SD SD SD
SD
SD
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_SC.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com SITE CONSTRUCTION PLANL4.0 1095
CC 01-17-2023
1095 of 1241
SD
SD
SD
SD SD SD
SD
SD 48 R
T
T
T
T
T
T
T
T
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_IR.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com PLANT LIST PLANTING AND IRRIGATION PLAN L5.0 1096
CC 01-17-2023
1096 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com DETAILS L6.0 8 1097
CC 01-17-2023
1097 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com DETAILS L6.1 9 1098
CC 01-17-2023
1098 of 1241
COMMUNITY GARDEN
WILSON
PARK MAXIMUM OCCUPANCY 48 PERSONS
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com DETAILS L6.2 10 1099
CC 01-17-2023
1099 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com DETAILS 11 L6.3 1100
CC 01-17-2023
1100 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: Ghuang Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com DETAILS L6.4 12 1101
CC 01-17-2023
1101 of 1241
WILSON PARK
COMMUNITY GARDEN DRAWN BY: SHEET TITLE SHEET CHECKED BY: SCALE: PROJECT NO: ISSUE DATE 2025 Gateway Place, Suite 285 San Jose, CA 95110 T 408.275.0565 DN GH/MM As Shown 21059 File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_CV.dwg Plot Date: 11/4/22 Saved By: Kkong Copyright © 2020 Callander Associates Landscape Architecture, Inc. OF 13 REVISION DATE CUPERTINO, CA BID SUBMITTAL 06/08/22 www.callanderassociates.com BEST MANAGEMENT PRACTICES L7.0 1102
CC 01-17-2023
1102 of 1241
Attachment E
1103
CC 01-17-2023
1103 of 1241
1104
CC 01-17-2023
1104 of 1241
1105
CC 01-17-2023
1105 of 1241
CITY OF CUPERTINO
Agenda Item
22-11568 Agenda Date: 1/17/2023
Agenda #: 26.
Subject: Consider Lawrence-Mitty Park and Trail project design direction following community outreach results.
Approve Lawrence-Mitty Park and Trail project design direction following community outreach results and proceed to Final Concept Design Development.
CITY OF CUPERTINO Page 1 of 1 Printed on 1/11/2023
powered by Legistar™1106
CC 01-17-2023
1106 of 1241
CITY COUNCIL STAFF REPORT
Meeting: January 17, 2023
Subject
Consider Lawrence-Mitty Park and Trail project design direction following community outreach results.
Recommended Action
Approve Lawrence-Mitty Park and Trail project design direction following community outreach results and proceed to Final Concept Design Development.
Summary
The preferred option has been identified as Concept B, “Story Trail” (Attachment A,) with some features from Concept C, “Play It Up.” The project team seeks Council approval of the design direction for the final concept plan, considering the responses from the community in Phases 2 and 3, as well as discussions with the Bicycle Pedestrian and Parks and Recreation commissions. With this approval, the project team will proceed with the Final Concept Design Development phase that is required for the CEQA/Environmental review process.
Background
In 2002, the City of Cupertino began work on acquiring, annexing, and developing a neighborhood park on approximately eight acres of land along the westerly edge of Lawrence Expressway near Mitty Way (Lawrence-Mitty.) Of the eight acres, roughly six acres are suitable for park development. Anticipating the inclusion of the area into Cupertino as a new park, the City pre-zoned the parcels as “Park/Recreation” in 2007.
In July 2020, the City Council passed Resolution 20-092, approving the purchase of the Lawrence-Mitty site from the County of Santa Clara for $2.69 million. The site was situated within the jurisdiction, City limits, and urban service area of the City of San Jose. In April 2022, the Local Area Formation Commission approved annexation of the property into the City. The annexation process was completed in August 2022.
At the City Council Meeting on July 19, 2022, the project team provided an update on the status of the Environmental Summary Report, public outreach process, and next steps in the design process for the Lawrence-Mitty Park and Trail project. 1107
CC 01-17-2023
1107 of 1241
Council received the update and identified several areas of interest:
safety and crime prevention
maintenance of the public and vegetated areas
landscaping improvements with a focus on using native species park design options to encourage activity and preserve natural features sound walls and/or berms
stormwater management
examples of other parks
continuing outreach
Discussion
With nearly six acres of developable land, the Lawrence-Mitty site has the potential to provide open space and park amenities for the public. The open space adjacent to the creek offers residents opportunities to walk, ride, learn, and play, which is critical for a healthy community. The site proximity to Saratoga Creek and Lawrence Expressway offers unique challenges for access and jurisdictional permissions. The park features proposed will need to balance site constraints and the community’s aspirations.
In August 2021, the City released a Request for Qualifications to solicit proposals from qualified professional consultants to develop the Lawrence-Mitty site. In October 2021, MIG, Inc. (MIG) was selected as the consultant forthis project and a contract was executed in December 2021. The City worked with MIG to develop a process for implementation of the project. The project has been divided into five phases, which include:
1) Existing Site Condition and Technical Analysis
2) Community Vision
3) Conceptual Design Alternatives
4) Draft and Final Plan
5) California Environmental Quality Act (CEQA) Clearance To date, the project team has completed Phases 1, 2 and 3, and is currently engaged in Phase 4.
Phase 1: Existing Site Condition and Technical Analysis: Environmental Summary Report (ESR) Key considerations discussed in the ESR include site-specific opportunities and constraints associated with the following elements: site access, noise reduction, easements and utilities, soil conditions (including existing construction and demolition waste,) stormwater management, biological resources, and tree inventory. The ESR provides recommendations and design considerations for each of these elements. The report is available for review at the project’s webpage, engagecupertino.org/lawrencemitty.
1108
CC 01-17-2023
1108 of 1241
Phase 2: Community Vision
This phase of the project was one of the initial activities forthe project team and centered on outreach endeavors to solicit feedback from the community regarding what was important to them and how they would like to use the future park. A list of those outreach events is listed below:
The opportunity to provide comments about the project on the ‘Engage Cupertino’ website at engagecupertino.org/lawrencemitty Online survey (Open March 30 to May 23, 2022) (563 responses) Two public Pop-up events
o April 16, 2022, at the Big Bunny 5K (approximately 30 participants) o May 7, 2022, at Creekside Park during youth soccer league (approximately 30 participants)
Virtual Community Meeting (April 27, 2022) (approximately 15 participants) Site tour (April 30, 2022) (approximately 60 participants) Joint Commission Meeting (June 13, 2022)
City Council meeting (July 19, 2022)
Phase 3: Conceptual Design Alternatives
After gathering initial community input and guidance at the Joint Commission meeting and City Council, the project team moved into Phase 3 - Conceptual Design Alternatives. The consultant developed three design options based on knowledge of the environmental conditions of the site, community input, and priorities gleaned from the Parks and Recreations System Master Plan.
The conceptual design themes focused on different primary uses of the park. The three alternatives were Concept A - “Wheel Fun,” Concept B - “Story Trail,” and Concept C - “Play It Up.” More information on the features in each design option is included in the November 17, 2022, Parks and Recreation Commission Presentation (Attachment A.) The project team conducted additional outreach activities to provide information and solicit feedback on the three conceptual design alternatives. Information about the survey and future events was provided to residents using mailings, social media posts, Items of Interest, the City’s Engage Cupertino website, and at the events themselves.
Those activities were:
Online community survey (October 3-31, 2022, with 371 responses) Community input pop-up at the Cupertino Library (October 8, 2022, approximately 70 participants)
Lawrence-Mitty site visit (October 15, 2022, approximately 73 participants) Virtual community meeting (October 17, 2022, 7 participants from the public) Bicycle Pedestrian Commission Meeting Update (November 16, 2022) Parks and Recreation Commission Update (November 17, 2022) 1109
CC 01-17-2023
1109 of 1241
The preferred option has been identified as Concept B - “Story Trail,” with some features from Concept C - “Play It Up,“ most notably expanded play areas for a wide range of user types and abilities. This hybrid option, based on community input received by the project team, will be the basis for the next phase of design development.
Phase 4: Design Development/Looking Forward
In this (the current) phase, the project team will develop the Final Concept Plan design based on the feedback received to date, and within the context of the approved funding available for the implementation.
We are looking for Council’s confirmation and approval of the design direction for development of the Final Concept Plan. Later, the project team will seek acceptance of the Final Concept Plan by City Council. Design elements included in the Final Concept Plan may be adjusted in consideration of the available project funding for construction.
The plan will then be used to initiate CEQA clearance (Phase 5) as well as provide the basis for the final construction schedule, plans, and budget refinements.
Phase 5: California Environmental Quality Act Clearance Once a Final Conceptual Plan is developed and accepted, the project team will move into Phase 5 - CEQA Clearance. The final outcome of Phase 5 is approval of the required CEQA document for implementation of the final design. The projected timeframe for CEQA clearance is six months after final acceptance of the final concept plan by the City Council. Once CEQA clearance is obtained, the City will pursue further development of the design and construction documentation.
Next Steps:
With Council’s approval of the Concept Design direction, the team will proceed to Final Concept Plan Design Development, and CEQA Clearance phases. Following those phases, the project team will develop construction documentation for permitting and bidding purposes. Construction of the park improvements at the Lawrence-Mitty site are anticipated to begin in 2024. The duration of the construction will be dependent on the requirements of the adopted/final design elements.
If Council does not approve the proposed design direction, the project team will require specific guidance on the revised design direction and clarification on the project team’s next steps.
Sustainability Impact
This project aligns with multiple objectives outlined in Chapter 6, Environmental Resources and Sustainability, of the City’s General Plan, Community Vision 2015-2040.
Development of the Lawrence-Mitty site will emphasize elements of Goal ES-1 to ensure a sustainable future, Goal ES-5 which is to protect the City’s urban and rural ecosystems, and Goal ES-7 to ensure the protection and efficient use of all water resources. 1110
CC 01-17-2023
1110 of 1241
California Environmental Quality Act
As noted in this report, CEQA clearance will occur as design is completed and before the City commits to undertaking a defined project.
Fiscal Impact
The current available balance for the project is $5,952,256 after expenditures for the acquisition and annexation of the property, as well as current design services. No additional funding is required because of this report.
Prepared by: John Raaymakers, Senior Project Manager
Reviewed by: Susan Michael, Capital Improvement Programs Manager Reviewed by: Matt Morley, Director of Public Works
Approved for Submission by: Pamela Wu, City Manager
Attachments:
A – 11-17-22 Parks and Recreation Presentation
1111
CC 01-17-2023
1111 of 1241
Parks and Recreation Commission Meeting
Design Alternatives & Community Input
November 17, 2022
Attachment A
1112
CC 01-17-2023
1112 of 1241
City of Cupertino
Capital Improvement Project Team
Parks and Recreation Department
MIG (Design Consultant)
Lawrence-Mitty Project Team
1113
CC 01-17-2023
1113 of 1241
Today’s Agenda
• Project Overview
• Design Alternatives
• Community Input
• What’s Next & Discussion
1114
CC 01-17-2023
1114 of 1241
PROJECT OVERVIEW
1115
CC 01-17-2023
1115 of 1241
Project Phases
2022 2023
1116
CC 01-17-2023
1116 of 1241
Site Context
1117
CC 01-17-2023
1117 of 1241
Lawrence-Mitty Park and Trail Site
1118
CC 01-17-2023
1118 of 1241
• Citywide Goals and
Regulations
• Topographic Survey
• Circulation and Access
• Noise Reduction
• Existing Utilities, Easements,
and Setbacks
• Soil Assessment
• Stormwater and Hydrology
• Biological Resources
• Trees and Planting
• Opportunities and Constraints
Environmental Summary Report
Phase 1: Conduct Technical Site Analysis
1119
CC 01-17-2023
1119 of 1241
• Nature Play
• Things to Climb
• Fitness Equipment
Top Recreation Features
• Nature Trails
• Native Plants to
Enhance Wildlife
• Creek Overlook
Top Community and
Comfort Features
• Shaded Areas
• Walking Paths
• Restroom
• Seating
Top Wildlife, Nature,
and Education Features
Phase 2: Develop a Community Vision
1120
CC 01-17-2023
1120 of 1241
DESIGN ALTERNATIVES
1121
CC 01-17-2023
1121 of 1241
Features Included in All Design Options
• An emphasis on
biking, walking,
play, nature, and
the creek.
• Multi-Use Trail
Extension
• Comfort and
Safety Features
• Increased Trees
and Vegetation
1122
CC 01-17-2023
1122 of 1241
1123
CC 01-17-2023
1123 of 1241
1124
CC 01-17-2023
1124 of 1241
1125
CC 01-17-2023
1125 of 1241
1126
CC 01-17-2023
1126 of 1241
1127
CC 01-17-2023
1127 of 1241
1128
CC 01-17-2023
1128 of 1241
COMMUNITY INPUT
1129
CC 01-17-2023
1129 of 1241
1130
CC 01-17-2023
1130 of 1241
October 8, 2022
70 participants (approx.)
Who: more families with
younger children and
teenagers
Library Pop-Up Event
Preferred Concept
A – Wheel Fun
16%
B – Story Trail
48%
C – Play It Up
36%
1131
CC 01-17-2023
1131 of 1241
A – Wheel Fun
16%
B – Story Trail
26%
C- Play It Up
58%
73 participants (approx.)
Who: more local neighbors,
trail users, and SterlingBarnhart Park users
Drop-in Site Visit
Preferred Concept
October 15, 2022
1132
CC 01-17-2023
1132 of 1241
7 community members Virtual Community Meeting
Who: several who also
came to in-person events
A – Wheel Fun
0%
B – Story Trail
83%
C – Play It Up
17%
Preferred Concept
October 17, 2022
1133
CC 01-17-2023
1133 of 1241
371 responses Online Survey
78% live in Cupertino
Of total responses…
23% live within the Rancho
Rinconada neighborhood
1% live within the Fairgrove
neighborhood
6% live within the South
Blaney neighborhood
10% live within the West San
Jose neighborhood
October 2022
West San Jose
West
San
Jose
Santa
Clara
Sunnyvale
1134
CC 01-17-2023
1134 of 1241
Q1 Top Two Favorite Features: Concept A – Wheel Fun
196
167
130
122
87 0 50 100 150 200 250
Creekside Bench Overlooks
Small Nature Play Elements Along the Trail
Bike Skills Courses (teens and adults)
Simple Exercise Stations
Bike Pump Track (young kids)
Mandatory Question (371 response(s))
Question type: Checkbox Question
Online Survey Summary
1135
CC 01-17-2023
1135 of 1241
Q2 Top Two Favorite Features: Concept B – Story Trail
Mandatory Question (371 response(s))
Question type: Checkbox Question
201
195
187
115
0 50 100 150 200 250
Creekside Deck Overlook
Dry Creek and Expanded Natural Areas
Nature Play Areas
Interpretive Features Along Trails
Online Survey Summary
1136
CC 01-17-2023
1136 of 1241
Online Survey Summary
Q3 Top Two Favorite Features: Concept C – Play It Up
Mandatory Question (371 response(s))
Question type: Checkbox Question
170
164
154
114
99 0 50 100 150 200
Creekside Bench Overlooks
Play Area Features
Picnic Grove
Fitness Station Circuit
Flex Lawn
1137
CC 01-17-2023
1137 of 1241
Online Survey Total Votes Side by Side Comparison
87 99
114
115
122
130
154
164
167
170
187
195
196
201
0 50 100 150 200 250
Bike Pump Track (young kids)
Flex Lawn
Fitness Station Circuit
Interpretive Features Along Trails
Simple Exercise Stations
Bike Skills Courses (teens and adults)
Picnic Grove
Play Area Features
Small Nature Play Elements Along the Trail
Creekside Bench Overlooks
Nature Play Areas
Dry Creek and Expanded Natural Areas
Creekside Bench Overlooks
Creekside Deck Overlook
A – Wheel Fun
B – Story Trail
C – Play It Up
Top Two Favorite Features
1138
CC 01-17-2023
1138 of 1241
Mandatory Question (371 response(s))
Question type: Radio Button Question
Q4 Cost and space limitations do not allow for all
features from the three concepts to be included.
Which feature is least important to you?
27.2%
13.7%
11.9%
11.3%
10.0%
6.2%
4.3%
3.8%
3.8%
3.2%
2.4%
2.2%
0% 5% 10% 15% 20% 25% 30%
Bike Skills Courses (teens and adults)
Bike Pump Track (young kids)
Flex Lawn
Fitness Stations
Interpretive Features Along Trails
Creekside Deck Overlook
Dry Creek Restoration Planting
Creekside Bench Overlooks
Picnic Grove
Play Area Features
New Restroom at Sterling Barnhart Park
Nature Play Areas Along the Trail
Online Survey Summary
1139
CC 01-17-2023
1139 of 1241
Q5 What is your preferred concept – A, B, C?
Mandatory Question (371 response(s))
Question type: Radio Button Question
A – Wheel Fun
22.1%
B – Story Trail
47.2%
C – Play It Up
30.7%
Online Survey Summary
1140
CC 01-17-2023
1140 of 1241
Q6 What do you like most about your preferred concept?
112
48 47
42 40
38 35
5 4
0 20 40 60 80 100 120
It has the nature experience I’m looking for
It has play for all ages
It has the best green space/open space
It has the recreation elements I think are most important I like all of the concepts to some extent
It creates a social and activity hub for the community
It has the bike-friendly experience I’m looking for
I don’t like any of the three concepts
Other (please specify)
Mandatory Question (371 response(s))
Question type: Radio Button Question
Online Survey Summary
1141
CC 01-17-2023
1141 of 1241
Most important to include:
• 41% Restroom
• 26% As many recreation
features as possible
• 20% As much sound wall
as possible
• 12% Features on the
southern half
Mandatory Question (371 response(s))
Question type: Radio Button Question
Q7 There are cost tradeoffs in the concepts.
What do you think is most important to include in the final design? Online Survey Summary
1142
CC 01-17-2023
1142 of 1241
Q7 Cost Tradeoffs
Most important to include:
• 30% As much sound wall
as possible
• 29% As many recreation
features as possible
• 23% Restroom
• 17% Features on the
southern half
Mandatory Question (86 response(s))
Question type: Radio Button Question
Q5 Preferred Concept
22%
42%
36%
A - Wheel Fun
B – Story Trail
C – Play It Up
Rancho Rinconada Neighborhood Participants
1143
CC 01-17-2023
1143 of 1241
Q8 Anything else you’d like to share?
Concerns
• Parking
• Encampments
• Graffiti, vandalism, safety
• Conflicts between bikes and other users
• Preserving south end as quiet/passive
space
• Sound wall reducing visibility/safety
Optional question (103 response(s), 268 skipped)
Question type: Essay Question
Ideas / Solutions
• Minimize parking issue by
creating a bike-oriented
destination with supporting
features (restroom, water
fountain)
• Tables/benches/resting near
play areas
• Prioritize natural areas,
planting
Online Survey Summary
1144
CC 01-17-2023
1144 of 1241
Library Pop-Up Site Visit Virtual Meeting Online Survey 21%
46%
33%
Preferred Concept Voting Combined Event Totals
Summary: Preferred Concept
1145
CC 01-17-2023
1145 of 1241
Library Pop-Up Site Visit Virtual Meeting Online Survey 21%
46%
33%
Preferred Concept Voting Combined Event Totals
Summary: Preferred Concept
1146
CC 01-17-2023
1146 of 1241
All Community Feedback Total Votes Side by Side Comparison 107
134
176
127
158
181
181
296
204
192
285
295
208
270
0 50 100 150 200 250 300 350
Bike Pump Track (young kids)
Flex Lawn
Fitness Station Circuit
Interpretive Features Along Trails
Simple Exercise Stations
Bike Skills Courses (teens and adults)
Picnic Grove
Play Area Features
Small Nature Play Elements Along the Trail
Creekside Bench Overlooks
Nature Play Areas
Dry Creek and Expanded Natural Areas
Creekside Bench Overlooks
Creekside Deck Overlook
Survey Library Site Visit Virtual
Summary: Top Two Favorite Features
1147
CC 01-17-2023
1147 of 1241
All Community Feedback Total Votes Side by Side Comparison 107
134
176
127
158
181
181
296
204
192
285
295
208
270
0 50 100 150 200 250 300 350
Bike Pump Track (young kids)
Flex Lawn
Fitness Station Circuit
Interpretive Features Along Trails
Simple Exercise Stations
Bike Skills Courses (teens and adults)
Picnic Grove
Play Area Features
Small Nature Play Elements Along the Trail
Creekside Bench Overlooks
Nature Play Areas
Dry Creek and Expanded Natural Areas
Creekside Bench Overlooks
Creekside Deck Overlook
Survey Library Site Visit Virtual
Summary: Top Two Favorite Features
1148
CC 01-17-2023
1148 of 1241
Community Priorities
From Top Concept (Story Trail)
Connecting with nature
Opening views to the creek
Additional Community Priorities
Play for all –
variety of recreation opportunities for
all ages, abilities, range of user groups
Supporting an interconnected
recreation system, future connections
Social and resting spaces
Restroom
Direction for Final Concept Plan
1149
CC 01-17-2023
1149 of 1241
WHAT’S NEXT
1150
CC 01-17-2023
1150 of 1241
Design Process
Three Design Alternatives
Park and Trail Plan
Community Input
Commissions + City Council
1151
CC 01-17-2023
1151 of 1241
1152
CC 01-17-2023
1152 of 1241
CITY OF CUPERTINO
Agenda Item
22-11595 Agenda Date: 1/17/2023
Agenda #: 27.
Subject: Abatement of public nuisance from weeds or other fire hazards pursuant to provisions of Cupertino Municipal Code Chapter 9.08 and Resolution No. 22-138; hearing for impacted property owners to contest the matter of proposed abatement
Adopt Resolution No. 23-019 ordering abatement of public nuisance from weeds or other fire hazards pursuant to provisions of Cupertino Municipal Code Chapter 9.08 and Resolution No. 22-138; and conduct hearing for impacted property owners to contest the matter of proposed abatement CITY OF CUPERTINO Page 1 of 1 Printed on 1/11/2023
powered by Legistar™1153
CC 01-17-2023
1153 of 1241
1 CITY COUNCIL STAFF REPORT
Meeting: January 17, 2023
Subject
Public hearing on the abatement of public nuisance from weeds or other fire hazards pursuant to provisions of Cupertino Municipal Code Chapter 9.08 and Resolution No. 22-138.
Recommended Action
Conduct hearing for impacted property owners to contest the matter of proposed abatement and adopt the Draft Resolution ordering abatement of public nuisance from weeds or other fire hazards pursuant to provisions of Cupertino Municipal Code Chapter 9.08 and Resolution No. 22-138.
Discussion
The purpose of the Cupertino Weed Abatement Program is to prevent fire hazards and other nuisances posed by vegetative growth (weeds) and the accumulation of combustible materials.
This program is managed by the Santa Clara County Department of Agriculture. Cupertino Municipal Code Chapter 9.08 requires property owners to remove or destroy weeds on their property for fire and public health protection. The weed abatement process is in place to notify the property owners of this responsibility, authorize the County to remove the hazards if the property owner does not, and allow the County to recover the costs of abatement.
On November 15, 2022 the Council adopted Resolution No. 22-138, declaring the growth of weeds or the accumulation of garden refuse, cuttings and other combustible trash upon private properties to be a potential fire hazard and a public nuisance. These properties are identified on the Weed Abatement Program Commencement Report prepared by the County (Attachment B, Exhibit A in Resolution). If Council wishes to adopt the Draft Resolution (Attachment A) ordering abatement of public nuisance, property owners on the Report will have until April 30, 2023 to abate any potential fire hazards on their property.
On December 13, 2022, the County mailed a notice to property owners listed on the Weed Abatement Program Commencement Report (Attachment C) indicating that their property must be cleared of hazards according to Minimum Fire Safety Standards (Attachment E), and that the City Council would conduct a public hearing on January 17, 2023 in order to consider all property 1154
CC 01-17-2023
1154 of 1241
2 owners having any objections to the proposed removal. City notices outlining the same information were mailed on December 16, 2022 (Attachment G).
How Parcels are Added to the Program
Parcels are added to the program through service requests from members of the public, a jurisdictional representative request, or when an inspector finds a non-compliant parcel en route from one active parcel to another. The identified parcels undergo an “add year” process prior to being added to the program. The add year is a buffer year, set aside for communications with the County and for property owners to gain an understanding of the program’s concerns, or to contest. All impacted parcels are expected to maintain the Minimum Fire Safety Standards (Attachment E) for the three years following the add year. The maximum grass height standard is 6 inches. The Program will not apply any fees to the parcel tax roll on the add year, only on the monitoring years. An initial inspection fee will be applied as “pass” or “fail” during the monitoring years. If a parcel fails, the monitoring years start over, to ensure that “three consecutive years of voluntary compliance” is achieved. County field officers perform inspections a few times a year. The inspection window for Cupertino runs annually from April 30 through October 31 and properties should be maintained throughout the year. If a property is abated before the April 30 deadline then the County administrative fee will be waived.
Process for Weed Abatement Program Outlined
The process consists of eight steps that begin in November and go through August of each year, as shown on the following list. At this time the process is at Step No. 4.
1. County prepares a report of all properties that have been non-compliant in removing weeds in the last three years and provides that report to the City (Nov-Dec) (Attachment B, Exhibit A in Resolution).
2. County sends notice to the property owners on the report notifying them of the hearing date and explaining that they must remove or destroy weeds by the abatement deadline of April 30, 2023 or it will be done for them, with cost of the abatement plus administrative costs assessed to their property (Nov-Dec) (Attachment H). The City also sends a courtesy letter to property owners listed on the report, notifying them of the hearing and the abatement deadline. If a property is abated before the April 30 deadline then the initial inspection fee will be waived (Jan).
3. City sends a courtesy letter to property owners listed on the report, notifying them of the hearing and the abatement deadline (Attachment G). If a property is abated before the April 30 deadline then the initial inspection fee will be waived.
4. City Council holds the hearing to consider objections by property owners and adopts a resolution declaring weeds a public nuisance and ordering abatement (Jan). 1155
CC 01-17-2023
1155 of 1241
3 5. County sends a courtesy letter to property owners listed on the report, notifying them again of the abatement deadline, and noting that they will work with the property owner to be sure the weeds are removed (Jan-Feb).
6. City sends a courtesy letter to property owners listed on the report, reminding them of the abatement deadline and that the initial inspection fee will be waived if the property is abated before the deadline (Mar).
7. After April 30, the properties are inspected by the County to verify that weeds were removed and proceeds with abatement if the property fails the inspection. The County makes a report of all costs associated with the abatement and provides that report to the City (June-July). The County also provides a report of costs associated with the initial inspection fee for compliant properties, for payment by the City and a report that includes properties that failed the inspection and associated costs proposed to be assessed.
8. City notifies the property owners listed on the assessment report, notifying them of the hearing date. (July-Aug)
9. City Council holds a hearing, considers any disputes, and adopts a resolution placing a lien assessment on the properties to allow the County to recover the cost of weed and/or brush abatement (July-Aug).
Fiscal Impact
There is no fiscal impact at this step in the process. If a property is abated before the April 30 deadline, the County administrative fee will be waived for the assessment hearing in July/August.
Any waived administrative fees will be billed to the City by the County to cover their cost of servicing the property. In 2021, the first year of inspection fees cost paid by the City for compliant properties was $7,896. In 2022, the second-year inspection fees cost for compliant properties was $10,465. A third-year trend estimation of costs to be covered by the City is $13,034. These costs are funded by the General Fund.
Sustainability Impact
There is no sustainability impact.
_____________________________________
Prepared by: Kirsten Squarcia, City Clerk
Approved for Submission by: Pamela Wu, City Manager
Attachments:
A – Draft Resolution and Exhibit A
B – 2023 Cupertino Commencement Report (Exhibit A)
C – County Letter to Property Owners to Abate Weeds
D – County Hearing Notice to Destroy Weeds and Program Fees 1156
CC 01-17-2023
1156 of 1241
4 E – Minimum Fire Safety Standards Program Brochure
F – Return Reply Form (RRF) Sample
G – City Letter to Property Owners
H – Approved Resolution No. 22-138
1157
CC 01-17-2023
1157 of 1241
RESOLUTION NO. 23‐___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
ORDERING ABATEMENT OF PUBLIC NUISANCE PURSUANT TO
PROVISIONS OF CUPERTINO MUNICIPAL CODE CHAPTER 9.08 AND RESOLUTION NO. 22‐138
WHEREAS, the City Council has declared that the growth of weeds, the accumulation of garden refuse, cuttings and other combustible trash upon the private properties as described in Resolution No. 22‐138 adopted November 15, 2022, to be a potential public nuisance (see Weed Abatement Program Commencement Report as Exhibit A); and
WHEREAS, after due notice, a public hearing/meeting thereon was held at the regular meeting of the City Council on January 17, 2023 to allow theimpacted property owners to contest the matter; and
WHEREAS, from the evidence presented, both oral and written, at the public hearing/meeting of January 17, 2023, it appears to be in the best interests of the City to acquire jurisdiction over the existing nuisances which have not been abated, and for the City to abate said nuisance in accordance with the law.
NOW, THEREFORE, BE IT RESOLVED:
1. That the Agricultural Commissioner is hereby ordered to abate such nuisance or cause the same to be abated by having the weeds referred to destroyed or removed by cutting, discing, chemical spraying or any other method determined by him; that all debris, whether in piles or scattered, be hauledaway;
2. That the Agricultural Commissioner and his deputies, assistants, employees, contracting agents or other representatives shall have express authorization to enter upon said private properties for the purpose of causing said public nuisance to be abated, in accordance with all applicable legal requirements; and
3. That any affected property owners shall have the right to destroy or remove such weeds or debris himself or herself or have the same destroyed or removed at his/her own expense provided that such destruction or removal shall have been completed prior to the arrival of the Agricultural Commissioner or his 1158
CC 01-17-2023
1158 of 1241
Resolution No. 23‐___
authorized representative to destroy or remove them by the Parcel Abatement Deadline of April 30, 2023.
BE IT FURTHER RESOLVED:
1. That the Agricultural Commissioner shall keep account of abating said nuisance and embody such account in a report and assessment list to the City Council, which shall be filed with the City Clerk.
2. Said reports of costs, hearing and collection procedures involved shall be provided as stated in Chapter 9.08.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino on the 17th day of January 2023, by the following vote:
Vote Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
SIGNED:
________
Hung Wei, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
1159
CC 01-17-2023
1159 of 1241
1160
CC 01-17-2023
1160 of 1241
1161
CC 01-17-2023
1161 of 1241
1162
CC 01-17-2023
1162 of 1241
1163
CC 01-17-2023
1163 of 1241
1164
CC 01-17-2023
1164 of 1241
1165
CC 01-17-2023
1165 of 1241
1166
CC 01-17-2023
1166 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
1 10101 WOLFE RD 316-20-120 VALLCO PROPERTY OWNER LLC ET 2600 EL CAMINO REAL STE PALO ALTO CA 94306-1719 13-3 2 10175 MC LAREN PL 316-21-049 CHAO, LIANG FANG 10175 MC LAREN PL CUPERTINO CA 95014-2335 13-0 3 19641 DRAKE DR 316-32-028 EDBERG, JEREMY AND YOUNG, 19641 DRAKE DR CUPERTINO CA 95014-2433 13-0 4 19661 DRAKE DR 316-32-030 RENTERIA, MICHAEL J AND 19661 DRAKE DR CUPERTINO CA 95014-2433 13-0 5 10696 FLORA VISTA AV 326-08-043 TAN, MAISON JZE SUN AND WONG, 10696 FLORA VISTA AV CUPERTINO CA 95014-1607 13-0 6 22482 SALEM AV 326-15-099 ARBAGEY, WAYNE P AND 680 LINDEN AV LOS ALTOS CA 94022-1627 13-0 7 10047 CRESCENT RD 326-16-027 POPAT, JANKI R AND DESAI, PREMAL 10047 CRESCENT RD CUPERTINO CA 95014-1050 13-0 8 10036 CRESCENT RD 326-17-065 HENGYE LLC 10559 FELTON WY CUPERTINO CA 95014-4305 13-0 9 10395 N STELLING RD 326-28-094 CHEN, ZHIFENG TRUSTEE & ET AL 10395 STELLING RD N CUPERTINO CA 95014-1613 13-0 10 21001 HAZELBROOK DR 326-28-095 JAGANATHAN, RAMESH AND 21001 HAZELBROOK DR CUPERTINO CA 95014-1628 13-0 11 20860 GARDEN GATE DR 326-30-034 ELLIOTT, JULIE TRUSTEE 204 EAGLE LN BRENTWOOD CA 94513 13-0 12 20985 GARDEN GATE DR 326-30-087 WU, RICHARD W ET AL 12181 COUNTRY SQUIRE LN SARATOGA CA 95070-3467 13-0 13 10511 GLENCOE DR 326-30-103 SUN, SHUPENG AND DONG, YUE 1152 CROCUS CT SUNNYVALE CA 94086-8449 13-0 14 10467 GLENCOE DR 326-30-106 ZHAI, JLANJUN AND WEI, LI 11566 FALLCREEK SPRING CUPERTINO CA 95014-5118 130 15 20710 GARDEN GATE DR 326-33-015 LO, ANGELINE WAH-YIN AND HENRY'PO BOX 2935 CUPERTINO CA 95015-2935 13-0 16 10692 PEBBLE PL 326-43-042 CHEN, SHUO-HAO AND LIOU, SU- 10692 PEBBLE PL CUPERTINO CA 95014-1333 13-0 17 10712 PEBBLE PL 326-43-044 WINGET, CHARLES M AND 10712 PEBBLE PL CUPERTINO CA 95014-1333 13-0 18 0 STEVENS BL 342-13-012 DEANE AND DEANE INC 4040 MOORPARK #116 SAN JOSE CA 95117-1851 13-0 19 0 STEVENS BL 342-14-066 ALAN ENTERPRISE LLC 1177 CALIFORNIA ST #1821 SAN FRANCISCO CA 94108 13-0 20 22645 SAN JUAN RD 342-17-067 MULLEN, EVA JO TRUSTEE 'PO BOX 835 CUPERTINO CA 95015-0835 13-0 21 22755 SAN JUAN RD 342-17-068 MADHANY, AL-HUSEIN N AND 22755 SAN JUAN RD CUPERTINO CA 95014-0000 13-0 22 10690 CORDOVA RD 342-17-083 WONG, KEITH TAI 10690 CORDOVA RD CUPERTINO CA 95014-3912 13-0 23 22577 SAN JUAN RD 342-17-084 DHUEY, MICHAEL J 22577 SAN JUAN RD CUPERTINO CA 95014-3932 13-0 24 10611 SANTA LUCIA RD 342-17-095 HUNTS, SUSAN E ET AL 10611 SANTA LUCIA RD CUPERTINO CA 95014-3937 13-0 24 records of 158 Santa Clara County Weed Abatement Program Page 1 1167
CC 01-17-2023
1167 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
25 22661 SAN JUAN RD 342-17-110 TURNER, PAUL J TRUSTEE & ET AL 10550 MIRA VISTA RD CUPERTINO CA 95014 13-0 26 0 EL CERRITO RD 342-21-004 ITEM, WERNER AND GLORIA E 22670 SAN JUAN RD CUPERTINO CA 95014-3933 13-0 27 22765 SAN JUAN RD 342-22-031 NEHAWANDIAN, NASIM 22765 SAN JUAN RD CUPERTINO CA 95014-3934 13-0 28 10625 CORDOVA RD 342-22-103 BREINBERG, STEVEN A AND DANNA 10625 CORDOVA RD CUPERTINO CA 95014-3911 13-0 29 0 (LAND ONLY) 342-45-001 CHAMBERLAIN, JACK T TRUSTEE 655 SKYWAY 230 SAN CARLOS CA 94070 13-0 30 23026 VOSS AV 342-50-016 INANI, ANAND TRUSTEE & ET AL 23026 VOSS AV CUPERTINO CA 95014-2663 13-0 31 0 (LAND ONLY) 342-50-019 CHAMBERLAIN, JACK T TRUSTEE 655 SKYWAY 230 SAN CARLOS CA 94070 13-0 32 0 STEVENS RD 351-10-043 PARKSIDE TRAIL LLC 'P.O BOX 320667 LOS GATOS CA 95032 13-0 33 22483 RIVERSIDE DR 356-03-041 CHANG, YU-MING AND LEE, CHIH- 1140 CANYON GREEN DR SAN RAMON CA 94582-4617 13-0 34 22222 MCCLELLAN RD 356-05-003 AIKINS, SONYA E TRUSTEE 5341 OLD REDWOOD HY 202 PETALUMA CA 94954 13-0 35 21885 HYANNISPORT DR 356-13-050 YU, XIAOMING AND CHENG, 21885 HYANNISPORT DR CUPERTINO CA 95014-4015 13-0 36 21906 HYANNISPORT DR 356-14-057 XU, HAO AND WANG, XUE 21906 HYANNISPORT DR CUPERTINO CA 95014-4016 13-0 37 21662 COLUMBUS AV 356-18-049 CHANG, ERIC AND CECILIA KAN 21662 COLUMBUS AV CUPERTINO CA 95014-4711 13-0 38 11235 BUBB RD 356-21-054 KARP, STEPHANIE J 11235 BUBB RD CUPERTINO CA 95014-4940 13-0 39 21576 LA PLAYA CT 356-23-015 SAHA, ANGSHUMAN AND 'PO BOX 2918 CUPERTINO CA 95015-2918 13-0 40 21710 REGNART RD 356-23-057 REGNART LLC 3163 HAWKCREST CL SAN JOSE CA 95135-0000 13-0 41 21987 LINDY LN 356-25-031 KANG, PING QI AND LIANG, YU JUAN 2408 CLEMENT ST SAN FRANCISCO CA 94121 13-0 42 NO SITUS 356-25-033 KANG, PINGQI ET AL 2793 RANDERS CT PALO ALTO CA 94303-0000 13-0 43 22041 LINDY LN 356-27-012 GOKHALE, MAKARAND R TRUSTEE & 22041 LINDY LN CUPERTINO CA 95014-4851 13-0 44 22090 LINDY LN 356-27-020 HANGGI, EVELYN B TRUSTEE 61145 WARD RD BEND OR 97702 13-0 45 22090 LINDY LN 356-27-021 KALKO, CHARLES Z AND MUNOZ, 22090 LINDY LN CUPERTINO CA 95014-4835 13-0 46 11450 CANYON VIEW CL 356-27-023 CHANG, CHIAO-FU AND SUE-FAY 11450 CANYON VIEW CL CUPERTINO CA 95014-0000 13-0 47 22032 LINDY LN 356-27-025 DE, KALPAJIT AND MAJUMDER, 22032 LINDY LN CUPERTINO CA 95014-4811 13-0 48 22310 PALM AV 357-04-023 VAN BLOMMESTEIN, ROBERT AND 1144 BRACE AV SAN JOSE CA 95125-3200 13-0 48 records of 158 Santa Clara County Weed Abatement Program Page 2 1168
CC 01-17-2023
1168 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
49 840 ROSE DR 359-04-019 LIAN, HAO AND WANG, JING 840 ROSE BLOSSOM DR CUPERTINO CA 95014-4214 13-0 50 10040 BIANCHI WY 359-07-021 YOUNG, PEYRUU AND HU, LEON 790 PILGRIM LOOP FREMONT CA 94539 13-0 51 20592 MCCLELLAN RD 359-18-010 CHANG, LANCE C AND MELODY F 20592 MCCLELLAN RD CUPERTINO CA 95014-2955 13-0 52 10540 FELTON WY 359-18-035 HWANG, PAO HANG AND HSU, 10405 DEMPSTER AV CUPERTINO CA 95014-1224 13-0 53 20616 MCCLELLAN RD 359-18-048 HARDEMAN, MELODY F ET AL 20616 MCCLELLAN RD CUPERTINO CA 95014-2955 13-0 54 0 BUBB RD 362-01-025 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 55 CRANBERRY DR 362-02-048 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 130 56 0 CRANBERRY DR 362-04-058 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 57 11226 BUBB RD 362-06-036 11226 BUBB INVESTMENT LP 22330 SANTA PAULA AV CUPERTINO CA 95014-2707 13-0 58 0 362-09-026 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 59 362-16-037 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 130 60 0 362-19-033 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 61 1103 S STELLING RD 362-22-006 KABRA, GOVIND AND ZAWAR, 1103 STELLING RD S CUPERTINO CA 95014-5020 13-0 62 1161 STELLING RD 362-22-018 LEPAGE-WOODIE, CASEY RENE 1504 GUIZOT ST SAN DIEGO CA 92107 13-0 63 7585 RAINBOW DR 362-24-003 WANG, TAO AND LI, WEI 7585 RAINBOW DR CUPERTINO CA 95014-5235 13-0 64 20666 CLEO AV 362-31-001 XU, BIN AND LI, YUCHUAN 20666 CLEO AV CUPERTINO CA 95014-5033 13-0 65 20652 CLEO AV 362-31-002 BURROW, BRADLEY J AND JUANITA S20652 CLEO AV CUPERTINO CA 95014-5033 13-0 66 NO SITUS 362-31-030 ALMASI, AZITA TRUSTEE & ET AL 965 LAUREL GLEN DR PALO ALTO CA 94304-1323 13-0 67 22040 REGNART RD 366-02-046 YOUNG, GREGORY S AND TATE, 3339 WATERFOWL WY DRIGGS ID 83422-1236 13-0 68 11841 UPLAND WY 366-03-062 VEMPATY, NAGESHWARA R AND 13304 GLEN BRAE DR SARATOGA CA 95070-4431 13-0 69 0 S STELLING RD 366-09-028 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 70 0 STAUFFER LN 366-09-053 UNION PACIFIC CO 10031 FOOTHILLS BLVD ROSEVILLE CA 95030 13-0 71 7690 PEACH DR 366-11-114 DOLL, CYNTHIA A TRUSTEE 4801 CAMERON RD ELK CA 95432 13-0 72 21650 RAINBOW CT 366-38-007 SUBRAMANIAN, VIJAY V TRUSTEE & 1182 MILLER AV SAN JOSE CA 95129-3930 13-0 72 records of 158 Santa Clara County Weed Abatement Program Page 3 1169
CC 01-17-2023
1169 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
73 21608 RAINBOW DR 366-38-031 LAU, PHYLLIS ANN CHOY TRUSTEE 'P O BOX 2726 CUPERTINO CA 95015 13-0 74 22033 REGNART RD 366-46-005 BIGLER, ROBERT A AND PUNITA P 11230 BUBB RD CUPERTINO CA 95014-4979 13-0 75 22045 REGNART RD 366-46-006 BIGLER, ROBERT A AND PUNITA P 11230 BUBB RD CUPERTINO CA 95014-4979 13-0 76 NO SITUS 366-46-007 BIGLER, ROBERT A AND PUNITA P 11230 BUBB RD CUPERTINO CA 95014-4979 13-0 77 10295 VICKSBURG DR 369-07-015 XU, GUANGJUN AND YANG, QI 10295 VICKSBURG DR CUPERTINO CA 95014-3358 13-0 78 10301 VICKSBURG DR 369-07-016 MUNTZ, DANIEL A AND KUNO, 10301 VICKSBURG DR CUPERTINO CA 95014-3358 13-0 79 10140 RICHWOOD DR 369-08-033 ORTIZ, ALFREDO TRUSTEE 'PO BOX 40 CUPERTINO CA 95015 13-0 80 10300 VICKSBURG DR 369-14-008 TANABE, THOMAS M TRUSTEE & ET 10300 VICKSBURG DR CUPERTINO CA 95014-3320 13-0 81 898 BRENT DR 369-24-025 KUOK, CHUN FREDERICK 898 BRENT DR CUPERTINO CA 95014-4553 13-0 82 879 BETTE AV 369-27-050 CHANG, JUI PO 1198 EAGLE RIDGE WAY MILPITAS CA 95035 13-0 83 20011 PACIFICA DR 369-28-042 SWAMINATHAN, RAM AND 20011 PACIFICA DR CUPERTINO CA 95014-3110 13-0 84 19397 PHIL LN 375-05-032 PONGURLEKAR, JITENDRA AND 19397 PHIL LN CUPERTINO CA 95014-3429 13- 85 10039 TANTAU AV 375-07-005 MEIER-LIM, FRANCES W AND 1710 HOLT AV LOS ALTOS CA 94024-6924 13- 86 10067 S TANTAU AV 375-07-007 WU, HUNGJEN HENRY 10067 TANTAU AV S CUPERTINO CA 95014-3541 13- 87 19160 COZETTE LN 375-07-022 HSU, TRACY TRUSTEE 22330 SANTA PAULA AV CUPERTINO CA 95014-2707 13- 88 10203 TANTAU AV 375-07-027 UYCHINCO, JOSE DATU AND ISABEL 10616 JOHNSON AV CUPERTINO CA 95014-3817 13- 89 19131 LOREE AV 375-07-029 KONG, FAN PENG AND CHEN, MING 19131 LOREE AV CUPERTINO CA 95014-3539 13- 90 10251 S TANTAU AV 375-08-004 TAO, BANG NHON AND WEN, 10251 TANTAU AV S CUPERTINO CA 95014-0000 13- 91 19145 TILSON AV 375-08-028 TSENG, DIEN J ET AL 19145 TILSON AV CUPERTINO CA 95014-3551 13- 92 10349 W BRET AV 375-10-022 HUANG, SZU-TAO AND LEE, EMMA 1818 LAGOON RD W PLEASANTON CA 94566 13- 93 10135 BRET AV 375-11-026 LI, HESHENG AND XU, YUAN 10135 BRET AV CUPERTINO CA 95014-3557 13- 94 10080 BRET AV 375-11-043 LI, YIMING TRUSTEE & ET AL 20790 GARDEN GATE DR CUPERTINO CA 95014 13- 95 10200 STERN AV 375-12-002 MC GRATH PATRICK W 'PO BOX 2422 PALO ALTO CA 94309-2422 132 96 10104 N STERN AV 375-12-011 SUNG, ROBERTO 10683 STELLING RD N CUPERTINO CA 95014-1647 13-2 96 records of 158 Santa Clara County Weed Abatement Program Page 4 1170
CC 01-17-2023
1170 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
97 18921 ARATA WY 375-12-041 CHEN, BILONG 18921 ARATA WY CUPERTINO CA 95014-3670 13-2 98 18921 LOREE AV 375-13-001 GAO, SHAOFEN 18921 LOREE AV CUPERTINO CA 95014-3672 13-2 99 18916 ARATA WY 375-13-002 JINSHAN PROPERTIES LLC 'PO BOX 398 MOUNTAIN VIEW CA 94042 13-2 100 10295 MORETTI DR 375-14-004 GAO, JIE JENIE TRUSTEE 240 DE ANZA LN LOS ALTOS CA 94022-4033 13-2 101 18815 TILSON AV 375-16-034 LI, BEI 10140 BYRNE AV CUPERTINO CA 95014-2808 13-2 102 18871 BARNHART AV 375-16-057 CHEN, YU DAVID AND CHIU, IWEN 18871 BARNHART AV CUPERTINO CA 95014-3601 13-2 103 10335 CALVERT DR 375-17-022 SRINIVASAN, MAHESHWARAN AND 10335 CALVERT DR CUPERTINO CA 95014-3807 13-2 104 10405 CALVERT DR 375-17-029 LUO, VINSON ET AL 45536 CHEROKEE LN FREMONT CA 94539 13-2 105 10425 CALVERT DR 375-17-031 GUARDINO, WEI TRUSTEE 10425 CALVERT DR CUPERTINO CA 95014-3807 13-2 106 10435 CALVERT DR 375-17-032 MCKEE, ELLEN D TRUSTEE 10435 CALVERT DR CUPERTINO CA 95014-3835 13-2 107 18755 BARNHART AV 375-17-051 JOHNSON, ALLEN R 1220 TASMAN DR SPC 513 SUNNYVALE CA 94089 13-2 108 18791 BARNHART AV 375-17-055 COURTIER, RODOLPHE AND LU, 18690 BARNHART AV CUPERTINO CA 95014-3860 13-2 109 10240 CALVERT DR 375-18-022 XING, PEI AND WANG, NADIA J 10240 CALVERT DR CUPERTINO CA 95014-3808 13-2 110 10361 JOHNSON AV 375-18-039 MC GRATH PATRICK W 'PO BOX 2422 PALO ALTO CA 94309-2422 132 111 10391 JOHNSON AV 375-18-042 LU, YING-WU 45449 LITTLE FOOT PL FREMONT CA 94539 13-2 112 10409 JOHNSON AV 375-18-044 CHAUDHARY, VAIBHAV AND 10175 VICKSBURG DR CUPERTINO CA 95014-3318 13-2 113 10356 STERLING BL 375-24-011 TEKAWADE, RAHUL P AND MORE, 10356 STERLING BL CUPERTINO CA 95014-3867 13-2 114 10308 STERLING BL 375-24-017 HAO STEVE MIN AND SUN QING PING 6962 BOLLINGER RD SAN JOSE CA 95129 132 115 18671 PRING CT 375-25-039 HUANG, CHANG-KAI AND TSENG, 18671 PRING CT CUPERTINO CA 95014-3822 13-2 116 18661 CRABTREE AV 375-25-047 SUBAINATI, MOHAMAD K AND JULIE 18661 CRABTREE AV CUPERTINO CA 95014-3864 13-2 117 18621 BARNHART AV 375-26-035 KOO, SANDRA S ET AL 18621 BARNHART AV CUPERTINO CA 95014-3801 13-2 118 18670 CRABTREE AV 375-26-054 TORRES, SARA ET AL 480 MONTEREY AV LOS GATOS CA 95030-5303 13-2 119 18730 BARNHART AV 375-27-001 VASILIEV, OLGA 18730 BARNHART AV CUPERTINO CA 95014-3804 13-2 120 18790 TUGGLE AV 375-27-019 NIE, XIAOQIONG 18790 TUGGLE AV CUPERTINO CA 95014-0000 13-2 120 records of 158 Santa Clara County Weed Abatement Program Page 5 1171
CC 01-17-2023
1171 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
121 18781 TUGGLE AV 375-27-025 CAMPBELL MICHAEL D 'P O BOX 5345 SAN JOSE CA 95150-5345 13-2 122 10540 WUNDERLICH DR 375-27-037 OH, SEUNGSEOK AND RYU, SUNA 10540 WUNDERLICH DR CUPERTINO CA 95014-3650 13-2 123 10519 GASCOIGNE DR 375-28-002 LI, XIN AND YU, LISHAN 10519 GASCOIGNE DR CUPERTINO CA 95014-3841 13-2 124 10549 GASCOIGNE DR 375-28-006 LAM, MARCOS C 10549 GASCOIGNE DR CUPERTINO CA 95014-3841 13-2 125 10520 JOHNSON AV 375-28-039 OU, LIANGYI AND ZHAO, YINGYING 10520 JOHNSON AV CUPERTINO CA 95014-3816 13-2 126 18690 BARNHART AV 375-28-041 WARREN, THOMAS C AND DOROTHY 'P O BOX 2639 SARATOGA CA 95070 13-2 127 10711 WUNDERLICH DR 375-29-021 HUANG, RUIYAN AND HU, LINGPING 816 JULIAN TERRACE 4 SUNNYVALE CA 94085 13-2 128 10840 JOHNSON AV 375-30-024 BENKENAN, SUZAN FISHEL 18891 NEWSOM AV CUPERTINO CA 95014-3818 13-2 129 10784 JOHNSON AV 375-31-003 CHEN, BOYI AND YE, ZHENZHEN 10784 JOHNSON AV CUPERTINO CA 95014-3818 13-2 130 10740 JOHNSON AV 375-31-007 CHA, CATHY Y TRUSTEE 10740 JOHNSON AV CUPERTINO CA 95014-3818 13-2 131 10711 GASCOIGNE DR 375-31-018 TSAI, CHIH JUNG AND LAI, HUI WEN 10711 GASCOIGNE DR CUPERTINO CA 95014-3845 13-2 132 10731 GASCOIGNE DR 375-31-020 NEJAT, FRANK F 'PO BOX 700702 SAN JOSE CA 95170 13-2 133 10670 MINETTE DR 375-31-046 PALLAPOTHU, KISHORE AND 10568 JOHNSON AV CUPERTINO CA 95014-3816 13-2 134 10667 WUNDERLICH DR 375-31-049 10671 JOHNSON INVESTMENT LLC 22330 SANTA PAULA AV CUPERTINO CA 95014-2707 13-2 135 10831 JOHNSON AV 375-31-065 HUO, XIPING AND SONG, 5023 CAPISTRANO AV SAN JOSE CA 95129-1025 13-2 136 10841 JOHNSON AV 375-31-066 LI, YONGNA AND SONG, NING 10841 JOHNSON AV CUPERTINO CA 95014-3819 13-2 137 10630 CARVER DR 375-32-020 MC GRATH PATRICK W 'PO BOX 2422 PALO ALTO CA 94309-2422 132 138 18870 TUGGLE AV 375-32-024 DELA CRUZ, SHERWIN PETER L 18870 TUGGLE AV CUPERTINO CA 95014-3626 13-2 139 18850 TUGGLE AV 375-32-026 ZHU, XINGLEI AND YIN, WENYUAN 18850 TUGGLE AV CUPERTINO CA 95014-3626 13-2 140 10827 MINETTE DR 375-32-057 WU, JIANPING 988 LEITH AV SANTA CLARA CA 95054-1950 13-2 141 18970 BARNHART AV 375-33-003 DARBY, MICHAEL AND LEE, SANDRA 18970 BARNHART AV CUPERTINO CA 95014-3669 13-2 142 18871 PENDERGAST AV 375-33-027 LUI, DAVID K 18871 PENDERGAST AV CUPERTINO CA 95014-3620 13-2 143 18881 PENDERGAST AV 375-33-028 CHENG, XINWU AND SHI, WEN 18881 PENDERGAST AV CUPERTINO CA 95014-3620 13-2 144 18931 PENDERGAST AV 375-33-033 KAWASAKI, ELAINE T TRUSTEE 18931 PENDERGAST AV CUPERTINO CA 95014-3622 13-2 144 records of 158 Santa Clara County Weed Abatement Program Page 6 1172
CC 01-17-2023
1172 of 1241
Situs APN CITY/STATE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T
Exhibit A
145 18911 TUGGLE AV 375-33-064 FLAUGHER, LOU ANN 18911 TUGGLE AV CUPERTINO CA 95014-3625 13-2 146 10657 MORENGO DR 375-34-013 ORTIZ, ROSA F ET AL 10657 MORENGO DR CUPERTINO CA 95014-3513 13-2 147 10673 MORENGO DR 375-34-015 SHARMA, SUBHASH C AND MAMTA 10673 MORENGO DR CUPERTINO CA 95014-3513 13-2 148 18930 TUGGLE AV 375-34-045 CHEN, XIAMIN AND XU, TINGJUN 18930 TUGGLE AV CUPERTINO CA 95014-3627 13-2 149 18940 NEWSOM AV 375-35-011 GEORGE, GNANA SELVIN AND 18940 NEWSOM AV CUPERTINO CA 95014-3618 13-2 150 10627 CULBERTSON DR 375-36-027 MC GRATH, PATRICK W 1184 VALELAKE CT SUNNYVALE CA 94089-2032 13-2 151 10524 S TANTAU AV 375-37-020 LIU, XIONG AND GUO, YAQIONG 10524 TANTAU AV S CUPERTINO CA 95014-0000 13-2 152 10623 JOHANSEN DR 375-37-058 WANG, LIEH C AND VIRGINIA S 6808 LEYLAND PARK DR SAN JOSE CA 95120-5616 13-2 153 899 S TANTAU AV 375-38-045 ZWEIG, JONATHAN M AND GRACE 899 TANTAU AV S CUPERTINO CA 95014-4648 13-0 154 928 HYDE AV 375-39-004 SAIKUMAR, GURUPRASAD AND 928 HYDE AV CUPERTINO CA 95014-4663 13-0 155 19210 TILSON AV 375-40-060 SINGH, TAJINDER AND SANDHU, 19210 TILSON AV CUPERTINO CA 95014-3529 13- 156 10455 TANTAU AV 375-40-066 JONES, JAMIE LYNNE RATLIFF 'PO BOX 698 CUPERTINO CA 95015-0698 13- 157 698 MILLER AV 375-42-011 LIN, JOHN YAW HWA AND MICHELLE698 MILLER AV CUPERTINO CA 95014-4640 13-0 158 678 MILLER AV 375-42-012 JEN, KO-TA AND CHRISTINA N 678 MILLER AV CUPERTINO CA 95014-4640 13-0 158 records of 158 Santa Clara County Weed Abatement Program Page 7 1173
CC 01-17-2023
1173 of 1241
1174
CC 01-17-2023
1174 of 1241
1175
CC 01-17-2023
1175 of 1241
(over)
TRA 13
Notice to
Destroy
Weeds
NOTICE IS HEREBY GIVEN that on November 15, 2022 pursuant to the provisions of Section 9.08 of the Cupertino Municipal Code, the City Council passed a resolution declaring that all weeds growing upon any private property or in any public street or alley, as defined in Section 9.08.010 of the Cupertino Municipal Code constitute a public nuisance, which nuisance must be abated by the destruction or removal thereof.
NOTICE IS FURTHER GIVEN that property owners shall without delay, remove all such weeds from their property and the abutting half of the street in front and alleys, if any, behind such property and between the lot lines thereof as extended, or such weeds will be destroyed or removed and such nuisance abated by the County Consumer and Environmental Protection Agency, in which case the cost of such destruction or removal will, including but not limited to administration costs, be assessed upon the lots and lands from which, or from the front or rear of which, such weeds shall have been destroyed or removed and such cost will constitute a lien upon such lots or lands until paid and will be collected upon the next tax roll upon which general municipal taxes are collected. All property owners having any objections to the proposed destruction or removal of such weeds are hereby notified to attend a meeting of said City to be held in the Council Chambers of City Hall, located at 10300 Torre Ave., Cupertino, California, on Tuesday, January 17, 2023 at 6:45 p.m., or as soon thereafter as the matter can be heard, when their objections will be heard and given due consideration.
The language and format for this notice is required by California Health and Safety Code Sections 14891 Et. Seq.
1176
CC 01-17-2023
1176 of 1241
(over)
CITY OF CUPERTINO WEED ABATEMENT PROGRAM SCHEDULE
January 17, 2023 Public hearing to consider objections to Abatement List.
April 30, 2023 PARCEL ABATEMENT DEADLINE
Parcel must be free from hazardous vegetation by this date or Inspector will order abatement.
July/August 2023 Assessment Hearing date to be scheduled by City Council.
2023 COUNTY WEED ABATEMENT FEES
Properties in the Weed Abatement Program, you will be responsible for an annual inspection fee of $92.00 per parcel.
Please be advised that the property owner of any parcel found to be non-compliant on or after the March 1st deadline will be charged a processing fee of $519.00 and the property will be scheduled for abatement by the County contractor. If you complete the abatement work before the County contractor performs the abatement, you will not incur further charges.
Should the abatement work be performed by a County contractor, you will be assessed the contractor’s charges plus a County administrative fee of $891.00 per parcel. 2023 COUNTY CONTRACTOR’S WEED ABATEMENT PRICE LIST
A) Disc Work**
PARCEL SIZE: 1st Disc + 2nd Disc = Total Discs
0-12,500 sq.ft. $412.39 $165.79 $578.18
12,501sq.ft.- 43,560sq.ft. $412.39 $165.79 $578.18
Larger than 1 Acre $299.56 $146.30 $445.86 (PER ACRE)
** It is required that parcels be disced twice a year. The cost for the first discing is higher due to additional work normally required during the first discing.
B) HANDWORK $5.57 PER 100 Square Feet (SF)
C) FLAIL 6 Foot Mower $7.11 PER 1,000 SF
MOWING 12 Foot Mower $7.11 PER 1,000 SF
D) LOADER WORK $170.40 PER HOUR
E) DUMP TRUCK $157.29 PER HOUR
F) BRUSH WORK $5.32 PER 100 SF
G) DEBRIS REMOVAL $58.52 PER HOUR
H) DUMP FEE 100%
Added to orders with debris removal at 100% of the dump site charge. *Please note this program does not offer herbicide application as a method of abatement. 1177
CC 01-17-2023
1177 of 1241
(over)
1178
CC 01-17-2023
1178 of 1241
MINIMUM FIRE SAFETY STANDARDS (MFSS)
Fire Safety
Through
Vegetation
Management
Fire Resistant Landscaping
Santa Clara County
Consumer and Environmental
Protection Agency
Weed Abatement Program
1553 Berger Drive #1
San Jose, Ca 95112
Phone (408) 282-3145
Fax: (408) 286-2460
[email protected]
1. Vegetation must not exceed 6 inches in height any time after the compliance deadline.
2. Maintain grasses and weeds below 6 inches for 10 feet horizontally on both sides of all roadways, including driveways and access routes. Roads and driveways must maintain a clearance of 10’ W by 13’6” H for all vegetation.
3. Clear flammable vegetation a minimum of 30 feet around any structure, occupied or not. Ornamental vegetation should be kept clear of dead material. Some conditions, such as slopes, may require up to a 100 foot clearance.
4. Parcels one acre or less shall be completely abated. Parcels over one acre up to five acres require 30 foot clearance around structures and perimeter property lines. Additional 30 foot cross fuel breaks may also be required.
5. Parcels larger than five acres require 30 foot clearance around structures and perimeter property lines in addition to 30-foot cross fuel breaks as needed to separate the remaining vegetation into sections no larger than five acres.
6. Keep property clear of accumulation of combustible debris, such as trash, wood, and dead vegetation. Stacked firewood and neatly piled yard waste is not considered to be combustible debris.
7. Keep vegetation cleared from under the eaves of houses.
8. Trim tree branches to at least 10 feet away from chimneys. Trim tree branches up from the ground to provide at least 6 feet of vertical clearance.
9. Clear leaves, pine needles and debris from roof and gutters.
The following is a partial list of fire resistant plants that you may choose to use around your home to reduce the risk of fire. Contact your local nursery for selections appropriate to your area. All grasses, including those purportedly fire resistant, must be maintained below 6” in height.
Trees:
African Sumac
California Pepper
Shrubs:
Bearberry
Carmel Creeper
Carolina Cherry
Catalina Cherry
Escallonia
Hopseed Bush
Lemonade Berry
Groundcover:
Aaron’s Beard
Australian Daisy
Candytuft
Sterile Capeweed
Freeway Daisy
Rock Rose (except Gum
Variety)
1179
CC 01-17-2023
1179 of 1241
The Santa Clara County Weed
Abatement Program
The Santa Clara County Consumer and Environmental Protection Agency and your city are working together to protect your community from fire. We need your help. Please read and follow the directions provided in this brochure regarding fire prevention on your property. The purpose of the Weed Abatement Program is to prevent fire hazards posed by vegetative growth and the accumulation of combustible materials.
The Weed Abatement program is entirely funded from fees charged to residents. Fees will be assessed for any property in the program.
This is to cover the cost of the compliance inspection for the property. Properties that fail the compliance inspection will be charged a failed inspection fee, even if the resident completes the weed abatement. If the property requires abatement by the County contractor, the property owner will be responsible for the actual cost of abatement plus an administrative fee. Properties that meet and maintain the minimum fire safety standards will not be charged other than the annual fee.
Program staff annually inspect parcels at the beginning of the fire season, which is typically in March or April depending on your jurisdiction. If the parcel is not in compliance at the time of inspection, the property owner will be charged a failed inspection fee, and the owner will be sent a courtesy notice as a reminder to abate the weeds. If the weeds are not abated by the property owner, the work will be completed by the County contractor. The property owner will pay the contractor’s fees plus a County administrative fee. All fees will be included in your property tax bill.
Our Goal Is Voluntary Compliance
Property Owner’s Responsiblilities
• Do not allow a fire hazard to exist on your property. The Minimum Fire Safety Standards (MFSS) in this brochure give you guidelines to follow in order to maintain your property and protect against a fire hazard. Please contact our office if you need guidance or have any questions regarding the requirements!
• Make arrangements to have your property maintained throughout the year. Contractors can be found in the yellow pages. You may choose to have the County contractor maintain your property. A current price list is included in your packet.
• Please complete and return the Reply Form provided in your mailing packet by the date on the form. Indicate your preference regarding performance of weed abatement services.
Program Staff Responsibilities
• Weed Abatement Inspectors will perform periodic inspections on all parcels included in the Santa Clara County Weed Abatement Program. Properties that fail the compliance inspection will be charged a failed inspection fee, even if the resident completes the weed abatement.
• Inspectors will order the County contractor to perform all necessary abatement work on any parcel where the MFSS are not met. An attempt will be made to give the owner a courtesy notice prior to releasing the work order.
• The County contractor uses several methods of abatement including discing and handwork. The property owner is free to select whatever method they choose, provided the MFSS of all federal, state and local laws are met.
• The Weed Abatement Program will place inspection costs and the charges for County contractor services plus a County administrative fee on the property owner’s tax bill during the next fiscal year.
Burrowing Owls
Frequently Asked Questions
Q. Why have I received an Abatement Notice?
A. Typically, a property is placed on the program if a Weed Abatement Inspector identified a potential fire hazard on the property. Fire Departments and other agencies also submit complaints to the Weed Abatement Program.
Q. What is required of me now that I am in the Program? A. All property owners are required to maintain their property free of fire hazards throughout the year.
Q. The grasses planted on my property are fire resistant. Are they exempt from the Weed Abatement program?
A. No. Even grasses that possess some fire resistant qualities are not fire proof, and they can add fuel to any site that is subject to a fire. Additionally, fire resistant grasses are rarely found in a pure, homogenous stand but rather are usually found to occur mixed with other common introduced annual grasses that are highly flammable and hazardous in a fire event. Finally, many grasses occur in Santa Clara County and species identification is difficult in the field, especially after the spring when the reproductive portions required for identification have dried and dispersed. Weed Abatement Inspectors can only focus on the presence of grasses and weeds on your property and the Minimum Fire Safety Standards, and not on grass species identification. Therefore, all grasses are required to be below 6 inches in height.
Q. What is the SC County Weed Abatement Program?
A. This is a monitoring program and our primary objective is voluntary compliance. See the first two paragraphs of this brochure for further specifics.
These small owls nest in abandoned ground squirrel
burrows. Discing collapses the burrows and kills the young.
These owls are listed as a state Species of Special Concern and are protected by the federal Migratory Bird Treaty Act. If you suspect burrowing owls on your property you must use another form of weed abatement such as mowing or weedeating. If you request the County perform abatement services, please notify program staff or your City if burrowing owls are known to exist on your property.
More FAQ:
Q. How long will I be on the Program?
A. Your property will remain on the Program for three years. If no hazards are found during that time, your property may be removed from the program.
Q. How much will this cost me?
A. There will be an annual fee to cover the cost of the compliance inspection. If the parcel does not meet the MFSS when it is first inspected in the spring, or if work is required by the County contractor, you will be charged additional fees. Our goal is to ensure that the MFSS are met at the lowest possible cost to the property owner.
Q. How will I be billed?
A. Any charges for the inspection and any abatement work performed will appear as a special assessment on your next property tax bill.
Q. Why have you performed work on my property while the vegetation is still green?
A. Grass, weeds or piles of combustible debris have been declared a public nuisance by your jurisdiction. Abating fire hazards in the spring minimizes the volume of combustible material before the hazards increase and dries out completely during the peak fire season.
Q. Will you notify me prior to beginning abatement work? A. Property owners are responsible for preventing fire hazards on their property. If the MFSS have been met, but further work is necessary, you will receive notice prior to the County contractor performing the work. If the MFSS have not been met, an attempt will be made to give the owner a courtesy notice prior to initial abatement.
Q. Where can I find someone to provide abatement
services?
A. Weed Abatement contractors can be found in the Yellow Pages under “Weed Control Services” or “Discing Services”.
You may have the County contractor perform the necessary work; see your mailing packet for a current price list as administrative costs are charged.
Q. How can I get additional information or assistance
regarding the specific requirements for my property?
A. Weed Abatement Inspectors are available to assist you and answer your questions. Please call our Customer Service line at (408) 282-3145 to schedule a consultation with program staff or to obtain additional information.
Q. I have Grazing Animals do I need to perform abatement? A. Grazing animals do not absolve you of your responsibilities to provide a fire safe condition on your property. You will need to check with our office to determine if grazing is adequate or if additional work is required.
1180
CC 01-17-2023
1180 of 1241
Sample
1181
CC 01-17-2023
1181 of 1241
December 13, 2022
Re: Weed Abatement Season Commencement and January 17, 2023 Public Hearing Your property has been placed on the enclosed Weed Abatement Program Commencement Report for public nuisance (weeds) pursuant to Section 9.08 of the Cupertino Municipal Code. Please refer to the attached Minimum Fire Safety Standards (MFSS) guidelines to make the corrections that are necessary and avoid the County administrative fee. The Cupertino City Council will hold a public hearing on Tuesday, January 17, 2023 at 6:45 p.m., in the Council Chamber in the Community Hall, City of Cupertino or via a teleconference meeting if authorized pursuant to Government Code section 54953(e). All properties identified by the Agricultural Commissioner as being noncompliant with Weed Abatement Program safety regulations will be declared to have hazardous conditions requiring abatement. Details on how to attend the meeting will appear on the City Council Agenda for that date.
About the Weed Abatement Program
The Santa Clara County Department of Agriculture and Environmental Management and the City of Cupertino are working together to prevent fire hazards posed by vegetative growth and accumulation of combustible materials.
Property owners are required to keep their property free of fire hazards—such as weeds— throughout the year. However, the Minimum Fire Safety Standards (MFSS) are required to be met each year by the April 30 deadline and then maintained throughout the year.
Vegetation must not exceed six inches in height any time after the compliance deadline.
Please see the reverse side of this page for the complete MFSS guidelines.
County staff annually inspect parcels at the beginning of the fire season, which is typically in March or April. If the property is not in compliance, the property owner will pay a fee equal to the contractor’s charges plus a County administrative fee. All fees will be included in your property tax bill. If your property is abated before the April 30 deadline then the County administrative fee will be waived.
1182
CC 01-17-2023
1182 of 1241
Weed Abatement Program Standards
The clearance requirements for the Weed Abatement program are referred to as the Minimum Fire Safety Standards (MFSS).
Minimum Fire Safety Standards (MFSS)
1. Vegetation must not exceed 6 inches in height any time after the compliance deadline
2. Maintain grasses and weeds below six (6) inches for ten feet horizontally on both sides of all roadways, including driveways and all access routes.
3. Clear flammable vegetation a minimum of thirty feet around any structure, occupied or not. Ornamental vegetation should be kept clear of dead material. Some conditions, such as slopes, may require up to 100 feet of clearance.
4. Parcels up to one acre shall be completely abated. Parcels one to five acres require 30-foot clearance around structures and perimeter property lines. Additional 30- foot cross fuel breaks may also be required.
5. Parcels larger than five acres require 30-foot clearance around structure and perimeter property lines in addition to 30-foot cross breaks as needed to separate the remaining vegetation into sections no larger than five acres.
6. Keep property clear of accumulation of combustible debris, such as trash, wood, and dead vegetation. Stacked firewood and neatly piled yard waste is not considered to be combustible debris.
7. Keep vegetation cleared from under the eaves of houses.
8. Trim tree branches to at least 10 feet from the structure and chimney.
9. Clear leaves, pine needles, and debris from roof and gutters.
If the compliance work identified for your property involves brush or weed removal, you may request the services of the approved County of Santa Clara abatement contractor. If you are interested in this service, please call the Hazardous Vegetation Service line at (408) 282-3145 to request more information and/or to schedule an inspection appointment for a cost estimate.
If you have any questions about the information on this notice, please contact the Santa Clara County Department of Agriculture, Hazardous Vegetation Management Program at (408) 918-4600.
Sincerely,
Lauren Sapudar
Deputy City Clerk
1183
CC 01-17-2023
1183 of 1241
RESOLUTION N0. 22-138
A RESO[ UTION OF THE CUPERTINO CITY COUNCI[
DECLARING WEEDS ON CERT AIN DESCRIBED PROPERTY TO BE A
POTENTIAL FIRE HAZARD OR OTHER POTENTIAL NUISANCES AND
SETTING A HEARING TO DECLARE PUBLIC NUISANCE AND POR
OBJECTIONS TO PROPOSED REMOV AL
WHEREAS, weeds as described in Chapter 9.08 of the Cupertino Municipal Code are growing in the City of Cupertino upon certain streets, sidewalks, highways, roads and private property; and
WHEREAS, said weeds are undesirable, noxious, and dangerous and/ or due to their rapid growth are or may become a fire menace; as such, said weeds constitute a potential public nuisance under state law and Chapter 9.08 of the Cupertino Municipal Code; and
WHEREAS, properl5r owners and other persons occupying or having charge or control of any building, lot, or premises within the City are required to remove weeds in accordance with the provisions of Chapter 9.08 of the Cupertino Municipal Code;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cupertino as follows:
1. Weeds growing upon any private property or in any street or alley within the City in violation of Cupertino Municipal Code, Chapter 9.08 constitute a public nuisance;
2. The weeds found on the streets, sidewalks, highways, roads and private property, which properties are identified by commonnames or by reference to the tract, block, lot, code area, and parcel number on the report prepared by the County Agricultural Commissioner and attached hereto as Exhibit A, are declared as having potential fire hazards or other potential nuisances due to weeds that are noxious, dangerous, or pose health risks;
3. That the 17th day of January, 2022, at the hour of 6:45 p.m., or as soon thereafter as the matter can be heard, in the Council Chamber in the Community Hall, City of Cupertino and via a teleconference meeting if 1184
CC 01-17-2023
1184 of 1241
Resolution No. 22-438
authorized pursuant to Government Code section 54953( e), with details on how to attend the meeting appearing on the City Council Agenda for that date, is hereby set as the time and place to declareweeds on these properties to be a public nuisance and where all property owners having any objections to the proposed removal of such weeds may be heard;
4. That the Agricultural Commissioner is hereby designated and ordered to give notice of the adoption of this resolution, in the manner and form provided in Chapter 9.08 of the Cupertino Municipal Code.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 15th day of November 2022 by the following vote:
Members of the City Council
AYES:
NOES:
ABSENT:
RECUSE:
Paul, Moore, Wei, Willey
None
None
Chao
SIGNED:
ti/g-/Z'-'21
Darcy Paul, €
City of Cupertino
Date
ATTEST:
Kirsten Squarcia, City Clerk Date
11/30/22
1185
CC 01-17-2023
1185 of 1241
1 2
3 4
Situs
10101
10175
19641
19661
10696
22482
10047
10036
10395 N
21001
20860
20985
10511
10467
20710
10692
10712
o
o
22645
22755
10690
22577
10611
WOLFE
MC LAREN
DRAKE
DRAKE
FLORA VISTA
SALEM
CRESCENT
CRESCENT
STELLING
HAZELBROOK
GARDEN GATE
GARDEN GATE
GLENCOE
GLENCOE
GARDEN GATE
PEBBLE
PEBBLE
STEVENS
STEVENS
SAN JUAN
SAN J?JAN
CORDOVA
SAN JUAN
SANTA LUCIA
RD
RD
RD
RID
RD
APN
316-20-120
316-21-049
316-32-028
316-32-030
326-08-043
326-1 5-099
326-16-027
326-17-065
326-28-094
326-28-095
326-30-034
326-30-087
326-30-103
326-30-106
326-33-015
326-43-042
326-43-044
342-1 3-012
342-14-066
342-17-067
342-17-068
342-17-083
342-17-084
342-17-095
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
VALLCO PROPERTY OWNER LLC ET 2600 EL CAMINO REAL STE
CHAO,LIANGFANG 10175 MCLARENPL
EDBERG, JEREMY AND YOUNG, 19641 DRAKE DR
RENTERIA,A4ICHAELJAND 19661 DRAKEDR
TAN, MAISON JZE SUN AND WONG, 10696 FLORA VISTA AV
ARBAGEY, WAYNE P AND 680 LINDEN AV
POPAT, JANKI R AND DESAI, PREMAL 10047 CRESCENT RD
HENGYELLC 10559 FELTONWY
CHEN, ZH[FENG TRUSTEE & ET AL 10395 STELLING RD N
JAGANATHAN, RAMESH AND 21001 HAZELBROOK DR
ELLIOTT J[JI,RE TRUSTEE 204 EAGLE LN
WU,RICHARDWETAL 12181 COUNTRYSQUIRELN
SUN, SHUPENG AND DONG, YUE 1152 CROCUS CT
ZHAI,JLANJUNANDWEI,LI 11566F,='!LLCREEKSPRING
LO, ANGELINE WAH-YIN AND HENRY ' Pa BOX 2935
CHEN,SHUO-HAOANDLIOU,SU- 10692PEBBLEPL
WINGET, CHARLES M AND 10712 PEBBLE PL
DEANE AND DEANE INC 4040 MOORPARK # 116
ALAN ENTERPRISE LLC
M[JLLEN, EVA JO TRUSTEE
MADHANY, AL-HUSEIN N AND
WONG, KEITH TAI
DHTJEY, MICHAEL J
HUNTS, SUSAN E ET AL
1177 CALIFORNIAST # 1821
Pa BOX 835
22755 SAN JUAN RD
10690 CORDOVARD
22577 SAN JUAN RD
10611 SANTALUCIARD
CITY / ST ATE
PALO ALTO
CUPERTINO
CtJPERTINO
CUPERTINO
CUPERTINO
LOS ,= UL,TOS
CTJPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
BRENTWOOD
SARATOGA
SUNNYVALE
CUPERTINO
CUPERTINO
CtJPERTINO
CUPERTINO
SAN JOSE
SAN FRANCISCO
CtJPERTINO
CUPERTINO
CUPERTINO
CtJPERTINO
CtJPERTINO
Exhibit A
CA 94306-1719
CA 95014-2335
CA 95014-2433
CA 95014-2433
CA 95014-1607
CA 94022-1627
CA 95014-1050
CA 95014-4305
CA 95014-1613
CA 95014-1628
CA 94513
CA 95070-3467
CA 94086-8449
CA 95014-5118
CA 95015-2935
CA 95014-1333
CA 95014-1333
CA 95117-1851
CA 94108
CA 95015-0835
CA 95014-0000
CA 95014-3912
CA 95014-3932
CA 95014-3937
1 3=
1 3=
I 3=
I 3=
I 3=
1 3=
I 3=
13=
130
13-
24 records of 158 Santa Clara County Weed Abatement Program Page I 1186
CC 01-17-2023
1186 of 1241
Situs
22661
o
22765
10625
o
23026
o
o
22483
22222
21&85
21906
21662
11235
21576
21710
21987
22041
22090
22090
11450
22032
22310
APN
SAN JUAN
EL CERRITO
SAN JUAN
CORDOVA
LAND ONLY)
VOSS
RD 342-17-110
RD 342-21-004
RD 342-22-031
RD 342-22-103
342-45-001
AV 342-50-016
LANDONLY) 342-50-019
STEVENS RD 351-10-043
RIVERSIDE DR 356-03-041
MCCLELLAN RD 356-05-003
HYANNISPORT DR 356-13-050
HYANNISPORT DR 356-14-057
COL{JMBUS AV 356-18-049
BUBB RID 356-21-054
LAPLAYA CT 356-23-Oal5
REGNART RD 356-23-057 REGNART LLC
LINDY LN 356-25-031
NO SITUS 356-25-033
LINDY LN 356-27-012
LINDY LN 356-27-020
LINDY LN 356-27-021
CANYONVIEW CL 356-27-023
LINDY LN 356-27-025
PALM AV 357-04-023
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
T{JRNER, PA{JL J TRUSTEE & ET AI, 10550 MIRA VISTA RID
ITEM, WERNER AND GLORIA E 22670 SAN JUAN RID
NEHAWANDIAN, NASIM 22765 SAN JUAN RD
BREINBERG, STEVEN A AND DANNA 10625 CORDOV A RD
CHAMBERLAIN,JACKTTRUSTEE 655 SKYWAY 230
INANT, ANAND TRUSTEE & ET AL 23026 VOSS AY
CHAMBERL,'aN,JACKTTRUSTEE 655 SKYWAY 230
PARI(SIDE TRAIL LLC ' P.O BOX 320667
CHANG, YTJ-M[NG AND LEE, CHIH- 1140 CANYON GREEN DR
AIKINS, SONYA E TRUSTEE 5341 0LD REDWOOD HY 202
YU, XIAOMING AND CHENG, 21885 HYANNISPORT DR
XU, HAO AND WANG, XUE 21906 HYANNISPORT DR
CHANG, ERIC AND CECILIA KAN 21662 COLtJMBUS AV
KARP, STEPHANIE J 11235 BUBB RD
SAHA, ANGS AND ' Pa BOX 2918
3163 HAWKCREST CL
KANG, PING QI AND LIANG, YU JUAN 2408 CLEMENT ST
KANG, PINGQI ET AL 2793 RANDERS CT
GOKHALE, R TRUSTEE & 22041 LINDY LN
HANGGI,EVELYNBTRUSTEE 61145 WARDRD
KALKO, CHARLES Z AND MUNOZ, 22090 LINDY LN
CHANG, CHIAO-FU AND SUE-FAY 11450 CANYON VIEW CL
DE, KALPAJIT AND MAJUMDER, 22032 LINDY LN
VAN BLOMMESTEIN, ROBERT AND 1144 BRACE AV
CITY/ST ATF,
CUPERTINO
CUPERTINO
CUPERTINO
CtJPERTINO
SAN CARLOS
CUPERTINO
SAN CARLOS
LOS GATOS
SAN RAMON
PETALUMA
CtJPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
SAN JOSE
SAN FRANCISCO
PALO ALTO
CtJPERTINO
BEND
CtJPERTINO
CUPERTINO
CUPERTINO
SAN JOSE
Exhibit A
95014
95014-3933
95014-3934
95014-3911
94070
95014-2663
94070
95032
94582-4617
94954
95014-4015
95014-4016
95014-4711
95014-4940
95015-2918
95135-0000
94121
94303-0000
95014-4851
97702
95014-4835
95014-0000
95014-4811
95125-3200
13,
13=
48 records of 158 Santa Clara County Weed Abatement Program Page 2 1187
CC 01-17-2023
1187 of 1241
59 Situs
840
10040
20592
10540
20616
o
o
11226
o
o
1103 S
1161
7585
20666
20652
22040
11841
OS
o
7690
21650
ROSE
BIANCHI
MCCLELLAN
PELTON
MCCLELLAN
BUBB
CRANBERRY
CRANBERRY
BUBB
STELLING
STELLING
RAINBOW
CLEO
CLEO
NO SITUS
REGNART
UPLAND
STELLING
STAUFFER
PEACH
RAINBOW
RID
RD
APN
359-04-019
359-07-021
359-18-010
359-18-035
359-18-048
362-01-025
362-02-048
362-04-058
362-06-036
362-09-026
362-1 6-037
362-19-033
362-22-006
362-22-018
362-24-003
362-31-001
362-31-002
362-31-030
366-02-046
366-03-062
366-09-028
366-09-053
366-11-114
366-38-007
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CuPERTINO
LIAN, HAO AND WANG, JING
YOUNG, PEfflUU AND nu, LEON
CHANG, LANCE C AND MELODY F
HWANG, PAO HANG AND HSU,
F-IARDEMAN, MELODY F ET AL
UNION PACIFIC CO
UNION PACIFIC CO
UNION PACIFIC CO
11226 B{JBB INVESTA/ fENT LP
840 ROSE BLOSSOM DR
790 PILGRIM LOOP
20592 MCCLELLAN RD
10405 DEMPSTERAV
20616 MCCLELLANRD
10031 FOOTH[ LLS BLVD
10031 FOOTH[, LS BLVD
10031 FOOTH[ LLS BLVD
22330 SANT A PAULA AV
UNIONPACIFIC CO 10031 FOOTH[ LLS BLVD
UNIONPACIFIC CO 10031 FOOTH[ LLS BLVD
UNION PACIFIC CO 10031 FOOTHILLS BLVD
KABRA, GOVIND AND ZAWAR, 1103 STELLING RD S
LEPAGE- WOODIE, CASEYRENE 1504 GUIZOTST
WANG, TAO AND LI, W'EI 7585 RAINBOW DR
NU, BIN AND LI, YUCHUAN 20666 CLEO AV
BURROW, BRADLEY J AND JUANITA S20652 CLEO AY
ALMASI, AZITA TRUSTEE & ET AL 965 LAUREL GLEN DR
YOUNG, GREGORY S AND TATE, 3339 WATERFOWL WY
X7EMPATY, NAGESHWARARAND 13304 GLENBRAEDR
UNIONPACIFIC CO 10031 FOOTH[LLS BLVD
UNIONPACIFIC CO 10031 FOOTHILLS BLVD
DOLL,CYNTHIAATRUSTEE 4801 CAMERONRD
SUB,VIJAYVTRUSTEE& 1182 M[LLERAV
CITY/ST ATE
CUPERTINO
FREMONT
CUPERTmO
CUPERTINO
CUPERTINO
ROSEVILLE
ROSEVn,LE
ROSEVILLE
CUPERTINO
ROSEVn,LE
ROSEVn,LE
ROSEVn,LE
CUPERTINO
SAN DIEGO
CUPERTINO
CUPERTINO
CUPERTINO
PALO ALTO
DRIGGS
SARATOGA
ROSEVn,LE
ROSEVILLE
ELK
SAN JOSE
Exhibit A
CA 95014-4214
CA 94539
CA 95014-2955
CA 95014-1224
CA 95014-2955
CA 95030
CA 95030
CA 95030
CA 95014-2707
CA 95030
CA 95030
CA 95030
CA 95014-5020
CA 92107
CA 95014-5235
CA 95014-5033
CA 95014-5033
CA 94304-1323
ID 83422-1236
CA 95070-4431
CA 95030
CA 95030
CA 95432
CA 95129-3930
I 3=
I 3=
I 3=
1 3=
1 3=
I 3=
I 30
1 3=
13=
13=
I 30
13=
I 3=
1 3=
I 3=
13=
13=
13=
1 3=
I 3=
I 3=
I 3=
I 3=
I 3=
72 records of "158 Santa Clara County Weed Abatement Program Page 3 1188
CC 01-17-2023
1188 of 1241
91 Situs
21608
22033
22045
RAINBOW
REGNART
REGNART
NO SITUS
10295 VICKSBURG
10301 VICKSBURG
10140 RICHWOOD
10300 VICKSBURG
898 BRENT
879 BETTE
20011 PACIFICA
19397 PH[,
10039 TANTAU
10067 S TANTAU
19160 COZETTE
10203 TANTAU
19131 LOREE
10251 S TANTAU
19145 TILSON
10349 W BRET
10135 BRET
10080 BRET
10200 STERN
10104 N STERN
96 records of 158
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
APN
366-38-031
366-46-005
366-46-006
366-46-007
369-07-015
369-07-016
369-08-033
369-1 4-008
369-24-025
369-27-050
369-28-042
375-05-032
375-07-005
375-07-007
375-07-022
375-07-027
375-07-029
375-08-004
375-08-028
375-10-022
375-11-026
375-11-043
375-12-002
LAU, PHYLLIS ANN CHOY TRUSTEE
BIGLER, ROBERT A AND PUNITA P
BIGLER, ROBERT A AND PUNITA P
BIGLER, ROBERT A AND PUNITA P
XU, GUANGJUN AND YANG, QI
MUNTZ, DANIEL A AND KUNO,
ORTIZ, ALFREDO TRUSTEE
TANABE, THOMAS M TRUSTEE & ET
KUOK, CHUN FREDERICK
CHANG, JUI PO
SWAMINATHAI% T, RAM AND
PONGURLEKAR, JITENDRA AND
MEIER- LIM, FRANCES W Aa'JD
NO, HUNGJEN HENRY
HSU, TRACY TRUSTEE
UYCHINCO, JOSE DATU AND ISABEL
KONG, FAN PENG AND CHEN, MING
TAO, BANG NHON AND WEN,
TSENG, DIEN J ET AL
HUANG, SZU-TAO AND LEE, EMMA
LI, HESHENG AND XU, YUAN
LI, YIMING TRUSTEE & ET AL
MC GRATH PATRICK W
375-12-011 SUNG,ROBERTO
P O BOX 2726
11230 B{JBB RD
11230 BUBB RD
11230 BUBB RD
10295 VICKSBURGDR
10301 VICKSBURGDR
Pa BOX 40
10300 VICKSBURG DR
898 BRENT DR
1198 EAGLERIDGEWAY
20011 PACIFICADR
19397 PHIL LN
1710 HOLT AV
10067 T ANT AU AV S
22330 SAINT A PAULA AY
10616 JOHNSON AY
19131 LOREE AV
10251 T ANT AU AV S
19145 TILSON AV
1818 LAGOONRDW
10135 BRET AV
20790 GARDEN GATE DR
Pa BOX 2422
10683 STELLINGRDN
Santa Clara County Weed Abatement Program
CITY / ST ATE
CUPERTINO
CUPERTINO
CUPERTINO
C[ITPERTINO
CUPERTINO
CUPERTINO
CtJPERTINO
CUPERTINO
CUPERTINO
MILPITAS
CUPERTINO
CUPERTINO
LOS ALTOS
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
PLEASANTON
CtJPERTINO
CtJPERTINO
PALO ALTO
CUPERTINO
Exhibit A
95015
95014-4979
95014-4979
95014-4979
95014-3358
95014-3358
95015
95014-3320
95014-4553
95035
95014-3110
95014-3429
94024-6924
9501 4-3541
9501 4-2707
95014-3817
95014-3539
95014-0000
95014-355i
94566
95014-3557
95014
94309-2422
95014-1647
1 3=
1 3=
13=
I 3=
I 3=
I 3=
I 3=
13-1
I 3=
I 3=
1 3=
13-
13-
13-
13-
13-
13-
13-
13-
i 3-
13-
13-
132
13-
1189
CC 01-17-2023
1189 of 1241
97 98
gg
Situs
18921
18921
18916
100 10295
101 18815
102 18871
103 10335
104 10405
105 10425
106 10435
107 18755
108 18791
109 10240
110 10361
115 10391
1-12 10409
113 10356
114 10308
115 18671
116 18661
117 18621
118 18670
ttg 18730
120 18790
ARATA
LOREE
ARATA
MORETTI
TILSON
BnT
CALVERT
CALVERT
CALVERT
CALVERT
BARNHART
BmT
CALVERT
JOHNSON
JOHNSON
JOHNSON
STERLING
STERLING
PRING
CRABTREE
BARNHART
CRABTREE
BiT
TUGGLE
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CuPERTINO
APN
WY 375-12-041 CHEN,Bn,ONG
AV 375-13-001 GAO,SHAOFEN
WY 375-13-002 JINSHANPROPERTIESLLC
DR 375-1 4-004 GAO, JIE JENIE TRUSTEE
AV 375-16-034 LI,BEI
18921 ARATAWY
18921 LOREE AY
Pa BOX 398
240 DE ANZA LN
10140 BYRNE AV
AV 375-16-057 CHEN,YUDAVID ANDCHIU, IWEN 18871 BARNHART AV DR 375-17-022 SRINIVASAN, MAHESHWARAN AND 10335 CALVERT DR DR 375-17-029 LUO,VINSON ET AL
DR 375-17-031 GUARDINO, WEI TRUSTEE
DR 375-17-032 MCKEE, ELLENDTRUSTEE
AV 375-17-051 JOHNSON, ALLENR
AV 375-17-055 COURTIER, RODOLPHE ANDLU,
DR 375-1 8-022 XING, PEI AND WANG, NADIA J
AV 375-1 8-039 MC GRATH PATRICK W
45536 CHEROKEE LN
10425 CALVERTDR
10435 CALVERTDR
1220 TASMAN DR SPC 513
18690 BARNHART AV
10240 CALVERTDR
Pa BOX 2422
AV 375-18-042 LU,YING-'WIJ
AV 375-18-044 CHA[[)HARY, VAIBHAV AND
BL 375-24-011 TEKAWADE, RAHUL P AND MORE,
45449 LITTLE FOOT PL
10175 VICKSBURGDR
10356 STERLING BL
BL 375-24-017 HAO STEVE MIN AND SUN QING PING 6962 BOLLINGER RD CT 375-25-039 HTJANG,CHANG-KAI ANDTSENG, 18671 PRINGCT
AV 375-25-047 SUBAINATI,MOKANDJULIE 18661 CRABTREEAV
AV 375-26-035 KOO, SANDRA S ET AL
AV 375-26-054 TORRES, SARA ET AL
AV 375-27-001 VASILIEV,OLGA
AV 375-27-019 NIE, XIAOQIONG
18621 BARNHART AY
480 MONTEREY AV
18730 BuT AV
18790 TUGGLE AV
Exhibit A
CITY/ST ATE
CUPERTINO
CUPERTINO
CA 95014-3670
CA 95014-3672
MOUNTAINVIEW CA 94042
LOS ALTOS
CUPERTINO
CUPERTINO
CUPERTINO
FREMONT
CUPERTINO
CUPERTINO
SUNNYVALE
CUPERTINO
CUPERTINO
PALO ALTO
FREMONT
CUPERTINO
CUPERTINO
SAN JOSE
CUPERTINO
CUPERTINO
CUPERTINO
LOS GATOS
CUPERTINO
CUPERTINO
CA 94022-4033
CA 95014-2808
CA 95014-3601
CA 95014-3807
CA 94539
CA 95014-3807
CA 95014-3835
CA 94089
CA 95014-3860
CA 95014-3808
CA 94309-2422
CA 94539
CA 95014-3318
CA 95014-3867
CA 95129
CA 95014-3822
CA 95014-3864
CA 95014-3801
CA 95030-5303
CA 95014-3804
CA 95014-0000
13-
13-
13-
13-
13-
I 3-
13-
13-
13-
13-
13-
13-
13-
132
13-
13-
13-
132
13-
13-
13-
13-
13-
13-
120 records of 158 Santa Clara County Weed Abatement Program Page 5 1190
CC 01-17-2023
1190 of 1241
140
141
142
143
144
Situs
18781
10540
10519
10549
10520
18690
10711
10840
10784
10740
10711
10731
10670
10667
10831
10841
10630
18870
18850
10827
18970
18871
18881
18931
GASCOIGNE
GASCOIGNE
JOHNSON
BaT
WUNDERLICH
JOHNSON
JOHNSON
JOHNSON
GASCOIGNE
GASCOIGNE
M[NETTE
WUNDERLICH
JOHNSON
JOHNSON
CARVER
TUGGLE
TUGGLE
A/IINETTE
BuT
PENDERGAST
PENDERGAST
PENDERGAST
APN
AV 375-27-025
DR 375-27-037
DR 375-28-002
DR 375-28-006
AV 375-28-039
AV 375-28-041
DR 375-29-021
AV 375-30-024
AV 375-31-003
AV 375-31-007
DR 375-31-018
DR 375-31-020
DR 375-31-046
DR 375-31-049
AV 375-31-065
AV 375-31-066
DR 375-32-020
AV 375-32-024
AV 375-32-026
DR 375-32-057
AV 375-33-003
AV 375-33-027
AV 375-33-028
AV 375-33-033
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
CAMPBELL M[CHAEL D
OH, SEtJNGSEOK AND RYU, SUNA
LI, XIN AND YIJ, LISHAN
LAM, MARCOS C
OU, LIANGYI AND ZHAO, YINGYING
WARREN, THOMAS C AND DOROTHY
HUANG, RUIY,"U%J AND nu, LINGPING
BENKENAN, SUZAN FISHEL
CHEN, BOYI AND YE, ZHENZHEN
CHA, CATHY Y TRUSTEE
TSAI, CHIH JUNG AND LAI, HUI WEN
NEJAT, FRANK F
PALLAPOTHU, I(ISHORE AND
10671 JOHNSONINVESTMENTLLC
P O BOX 5345
10540 WUNDERLICHDR
10519 GASCOIGNE DR
10549 GASCOIGNE DR
10520 JOHNSON AV
P O BOX 2639
816 JULIANTERRACE 4
18891 NEWSOMAV
10784 JOHNSON AV
10740 JOHNSON AV
10711 GASCOIGNEDR
PO BOX 700702
10568 JOHNSON AV
22330 SANT A PAULA AV
HUO, XIPING AND SONG, 5023 CAPISTRANO AV
Ll, YONGNA AND SONG, NING 10841 JOHNSON AV
MC GRATH PATRICK W ' PO BOX 2422
DELA CRUZ, SHERWIN PETER L 18870 TUGGLE AV
ZHU, XINGLEI AND YIN, WENYUAN 18850 TUGGLE AV
NO,JIANPING 988 LEITHAV
DARBY, MICHAEL AND LEE, SANDRA 18970 BT AV
LUI, DAVID K 18871 PENDERGAST AY
CHENG, XINWTJ AND SHI, WEN 18881 PENDERGAST AV
AVKAW ASAKI, ELAINE T TRUSTEE 18931 PENDERGAST
CITY / ST ATE
SAN JOSE
CUPERTINO
CUPERTINO
CtJPERTINO
CUPERTINO
SARATOGA
SUNNYVALE
CtJPERTINO
CUPERTINO
CUPERTINO
CtJPERTINO
SAN JOSE
CUPERTINO
CUPERTINO
SAN JOSE
CtJPERTINO
PALO ALTO
CtJPERTINO
CUPERTINO
SANTA CLARA
CtJPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
Exhibit A
95150-5345
95014-3650
95014-3841
95014-3841
95014-3816
95070
94085
95014-3818
95014-3818
95014-3818
95014-3845
95170
95014-3816
95014-2707
95129-1025
95014-3 819
94309-2422
95014-3626
95014-3626
95054-1950
95014-3669
95014-3620
95014-3620
CA 95014-3622
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
13-
132
13-
13-
13-
13-
13-
13-
i 3-
144 records of 158 Santa Clara County Weed Abatement Program Page 6 1191
CC 01-17-2023
1191 of 1241
Situs
145 18911
146
147
148
149
150
151
152
153
154
155
156
157
158
TUGGLE AV
MORENGO
MORENGO
TUGGLE
NEWSOM
CULBERTSON
TANTAU
JOHANSEN
10657
10673
18930
18940
10627
10524 S
10623
899
928
19210
10455
698
678
S TANTAU
HYDE
Tn,SON
TANTAU
M[LLER
M[LLER
APN
375-33-064
375-34-013
375-34-015
375-34-045
375-35-011
375-36-027
375-37-020
375-37-058
375-38-045
375-39-004
375-40-060
375-40-066
375-42-011
375-42-012
2023 WEED ABATEMENT PROGRAM
COMMENCEMENT REPORT
CITY OF CUPERTINO
FLAUGHER,LOUANN 18911 TUGGLEAV
ORTIZ, ROSA F ET AL 10657 MORENGO DR
S, S{JBHASH C AND MAMTA 10673 MORENGO DR
CHEN, ) aAM[N AND XU, TINGJUN 18930 TUGGLE AV
GEORGE, GNANA SELVIN AND 18940 NEWSOM AV
MC GRATH, PATRICK W 1184 VALELAKE CT
LIU, XIONG AND GUO, YAQIONG 10524 TANT AU AY S
WANG, LIEH C AND VIRGINIA S 6808 LEYLAND PARK DR
ZWEIG, JONATHAN M AND GRACE 899 TANTAU AV S
SAIKUMAR, GURUPRASAD AND 928 HYDE AV
SINGH, TAJINDER AND SANDHU, 19210 TILSON AV
JONES, JAMIE LYNNE RATLIFF ' Pa BOX 698
LIN, JOHN YAW HWA AND M[CHELLE 698 MILLER AV
JEN, KO-TA AND CHRISTINA N 678 A/ffLLER AV
CITY / ST ATE
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CtJPERTINO
SVNNYVALE
CUPERTINO
SAN JOSE
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
CUPERTINO
Exhibit A
95014-3625
95014-3513
95014-3513
95014-3627
95014-3618
94089-2032
95014-0000
95120-5616
95014-4648
95014-4663
95014-3529
95015-0698
95014-4640
95014-4640
158 records of ' 158 Santa Clara County Weed Abatement Program Page 7 1192
CC 01-17-2023
1192 of 1241
CITY OF CUPERTINO
Agenda Item
23-11899 Agenda Date: 1/17/2023
Agenda #: 28.
Subject: Consider approving amendments to Elected Officials’ Compensation Program Adopt Resolution No. 23-020 amending the Elected Employees' Compensation Program CITY OF CUPERTINO Page 1 of 1 Printed on 1/11/2023
powered by Legistar™1193
CC 01-17-2023
1193 of 1241
CITY COUNCIL STAFF REPORT
Meeting: January 17, 2023
Subject
Consider approving amendments to Elected Officials’ Compensation Program Recommended Action
Adopt Resolution #23‐XXX amending the Elected Employeesʹ Compensation Program Discussion
In July 2019, the City negotiated and approved Health in Lieu benefits as part of labor contract negotiations with the Cupertino Employeesʹ Association (ʺCEAʺ). By City Resolution No. 19‐ 144, the Health in Lieu benefit, as amended, was adopted by the City Council for appointed, CEA represented employees, unrepresented employees, and elected officials. Following adoption of Resolution 19‐144, the City Attorney’s Office determined that the Health in Lieu benefit was inconsistent with limits on compensation for elected officials in Government Code section 36516. To bring the Elected Employees’ Compensation Program into compliance with state law, staff recommends removal of the existing policy language to remove references to the Health in Lieu benefit.1 Additionally, the Innovation and Technology (IT) Department has revised the language in the Council Technology Policy. The existing policy provides a technology stipend for Councilmembers to purchase hardware and software for official business purposes. This City Manager policy has been revised to address cybersecurity and records preservation concerns and to ensure that Councilmembers can be fully supported by the IT Department. Underthe revised policy, Councilmembers may elect to be issued equipment for the performance of official City business. Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies. Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department.
Sustainability Impact
No sustainability impact.
1 All impacted Councilmembers were required to return Health in Lieu payments made by the City.
1194
CC 01-17-2023
1194 of 1241
Fiscal Impact
No fiscal impact.
_____________________________________
Prepared by: Vanessa Guerra, Human Resources Manager
Reviewed by: Kristina Alfaro, Director of Administrative Services Approved for Submission by: Pamela Wu, City Manager
Attachments:
A – Elected Officials’ Compensation Program – Redline
B – Elected Officials’ Compensation Program – Clean
C – Resolution #23‐XXX Amending the Elected Employeesʹ Compensation Program D – Council Technology Policy 2022
1195
CC 01-17-2023
1195 of 1241
1 Exhibit A
City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 1
PROGRAM PURPOSE AND DEFINITIONS FOR ELIGIBILITY
It is City of Cupertino policy that those certain persons holding positions hereinafter defined and designated as elected official positions shall be eligible for participation under the Elected Officials Compensation Program as hereby adopted by action of the City Council and as same may be amended or as otherwise modified from time to time.
Eligibility for inclusion with this Compensation program is limited to persons holding positions as elected officials. These are designated by the voters and may be modified as circumstances warrant.
The position in the following classification has been designated as elected official.
ELECTED OFFICIAL CLASSIFICATIONS:
Classification Title City
Council Member
Adopted by Action of the
City Council, July 2013
1196
CC 01-17-2023
1196 of 1241
2 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 2
SALARY SCHEDULE
As rates of pay are set forth under the Cupertino Municipal Code 2.16.020, and hereby adopted by action of the City Council, so are those rates of pay included herein as a part of this Compensation program. The inclusion herein of said rates and schedules does not affect any effective dates or otherwise reflect on the approval processes required but is shown as an integral part of this Program for completeness of record.
Adopted by Action
of the City Council
July, 2013, October
2016
1197
CC 01-17-2023
1197 of 1241
3 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 3
TRAINING AND CONFERENCES
I. POLICY
It is City of Cupertino policy that members of the City Council and the Council’s commissions and committees, shall be reimbursed or receive a direct advance according to the schedules, terms and conditions as set forth herein for the expenses authorized below. This policy is established in accordance with California Government Code Sections 53232.2 and 53232.3.
III. AUTHORIZED EXPENSES
The City Council and their commission and committee members can receive reimbursements or advances toward actual and necessary expenses incurred by participating in the following activities or events:
1. Communicating with representatives of regional, state and national government on City adopted policypositions;
2. Attending seminars, conferences, and training to improve skill and information levels;
3. Participating in regional, state and national organizations whose activities affect the City’s interests (such as the League of California Cities);
4. Attending International Conferences, budget limited to $2,500 per fiscal year, provided there is a benefit to the City;
5. Attending City events;
1. Attending functions of other local civic or community organizations where there is a clear nexus between the event and the member’s attendance as an official representative of the City. Purely social events, service club dues and meals, and political or charitable contributions or events would be excluded. For purposes of this section, reimbursable fundraisers and events include, but are not limited to, Cupertino Union School District, Fremont Union High School District, Foothill‐ De Anza Community College District, Silicon Valley Leadership Group, Cupertino American Cancer Society (ACS) Relay for Life and Cupertino Chamber of Commerce activities.
1198
CC 01-17-2023
1198 of 1241
4 The City will not reimburse or advance payment toward expenses including, but not limited to:
1. The personal portion of any trip;
2. Family expenses, including those of a partner when accompanying Council or commission member on City related business, as well as child or pet related expenses.
3. Entertainment expenses, including theatre, shows, movies, sporting events, golf, spa treatments, etc.
4. Meals and entertainment paid on behalf of third parties outside of the City;
5. Gifts of any kind for any purpose;
6. Alcoholic beverages;
7. Non‐mileage personal automobile expenses including repairs, insurance, gasoline, traffic citations; and
8. Personal losses incurred while on City business.
IV. BUDGETARY LIMITATIONS
Reimbursement or advancement of expenses shall not exceed budgetary limitations.
Changes in appropriations will be done through the budget process.
V. REIMBURSEMENT AND ADVANCE SCHEDULE
A. Intent
This schedule is written with the intent that the City Councilmember, commissioner, or committee member will make every effort to find the lowest possible cost to the City for traveling on City business. For example, if paying for parking at the airport is less expensive than paying for a taxi or airport shuttle, then officials should drive their car and park at the airport; or if renting a car is lower than taking taxis at the out‐of‐town location, then a car should be rented. Air reservations should be booked in advance to obtain discounted fares. The following procedures apply whether the expense is being paid through a reimbursement or a direct advance.
1199
CC 01-17-2023
1199 of 1241
5 B. Local Area
The local area is defined to be within Santa Clara and San Mateo Counties and within a 40 mile distance from Cupertino when traveling to Alameda County.
C. Registration
The City will pay the registration fee for authorized attendance at a convention, conference, seminar or meeting.
D. Transportation
The City will pay transportation costs on the basis of the lowest cost intent stated in paragraph A. Eligible transportation costs include airfare (with coach fare being the maximum), van or taxi service to and from the attendee’s home and airport, destination or airport parking charges, taxi and shuttle services at the out‐of‐town location, trains, tolls, or rental cars. Use of a personal automobile for City business shall be reimbursed or advanced at the rate per mile in effect for such use, except in no case shall it exceed air coach fare if the vehicle is being used for getting to the destination. Government or group rates offered by a provider of transportation must be used whenavailable.
E. Lodging
Hotel or lodging expenses of the City official resulting from the authorized event or activity defined in this policy will be reimbursed or advanced if the lodging and event occur outside the local area. Not covered will be lodging expenses related to person(s) who are accompanying the City member, but who themselves are not on City business.
In this instance, for example, the difference between single and multiple occupancy rates for a room will not be reimbursed.
Where the lodging is in connection with a conference or other organized educational activity, City‐paid lodging costs shall not exceed the maximum group rate published by the conference or activity sponsor, providing that lodging at the group rate is available at the time of booking. If the group rate at the conference hotel is not available, then the non‐conference lodging policy described in the next paragraph should be followed to find another comparable hotel.
Where lodging is necessary for an activity that is not related to a conference or other organized educational activity, reimbursement or advances shall be limited to the actual cost of the room at a group or government rate. In the event that a group or government 1200
CC 01-17-2023
1200 of 1241
6 rate is not available, lodging rates that do not exceed the median price for lodging for that area and time period listed on travel websites like www.hotels.com, www.expedia.com or an equivalent service shall be eligible for reimbursement or advancement.
F. Meals
1. No Conference
The actual cost of a meal can be claimed, within a standard of reasonableness, but receipts must be kept and submitted for the expense incurred.
2. As Part of a Conference
When City officials are attending a conference or other organized educational activity, they shall be reimbursed or advanced for meals not provided by the activity, on an actual cost basis. The actual cost rate shall follow the rules described in the meals with no conference paragraph.
G. Other Expenses
Payments toward or reimbursement of other expenses related to authorized activities or events shall be limited to the actual costs consistent with the application of reasonable standards. Receipts must be kept and submitted for all expenses.
VI. DIRECT CASH ADVANCE POLICY
From time to time, it may be necessary for a City official to request a direct cash advance to cover anticipated expenses while traveling or doing business on the City’s behalf. Such request for an advance should be submitted to the City Manager or Department Head no less than seven days prior to the need for the advance with the following information: 1) Purpose of the expenditure; 2) The anticipated amount of the expenditure (for example, hotel rates, meal costs, and transportation expenses); and 3) The dates of the expenditure.
An accounting of expenses and return of any unused advance must be reported to the City within 30 calendar days of the official’s return on the expense report described in Section VII.
1201
CC 01-17-2023
1201 of 1241
7 VII. EXPENSE REPORT REQUIREMENTS
All expense reimbursement requests or final accounting of advances received must be approved by the City Manager or Department Head, on forms determined by the Finance Department, within 30 calendar days of an expense incurred, accompanied by a business purpose for all expenditures and a receipt for each item other than mileage. The report will be a public record subject to disclosure under the Public Records Act.
VIII. REPORTS TO CITY COUNCIL OR COMMISSIONS
At the next regular City Council or commission meeting, each councilmember or commissioner shall briefly report on publicly noticed meetings attended at City expense.
If multiple members attended the meeting, a joint report may bemade.
IX. POLICY VIOLATIONS
Violations of this policy including falsifying expense reports may result in any or all of the following: (1) loss of reimbursement privileges, (2) demand for restitution to the City, (3) civil penalties of up to $1,000 per day and three times the value of the resources used, and 4) prosecution for misuse of public resources.
Revised 7/83, 7/85, 7/87, 7/88, 7/91, 7/92, 12/07, 7/10 1202
CC 01-17-2023
1202 of 1241
8 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 4
MILEAGE REIMBURSEMENTS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be compensated fairly for the use of personal automotive vehicles on City business. Those persons who occasionally are required to use their personal automobiles for City business shall be reimbursed for such use at the established IRS rates. Submission of reimbursement requests must be approved by the City Manager.
Adopted by Action of the City Council
July, 2013
1203
CC 01-17-2023
1203 of 1241
9 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 5
ASSOCIATION MEMBERSHIPS AND
PROFESSIONAL PUBLICATIONS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be entitled to City sponsored association memberships as well as receiving subscriptions to professional and technical publications. Such sponsorship, however, shall be conditioned upon the several factors as set forth below.
Each association for which membership is claimed must be directly related to the field of endeavor of the person to be benefited. Each claim for City sponsored membership shall be submitted with their concurrence to the City Manager for approval.
Subscriptions to or purchase of professional and technical publications may be provided at City expense when such have been authorized by the City Manager providing the subject matter and material generally contained therein are related to municipal governmental operations.
Adopted by Action of
the City Council
July, 2013
1204
CC 01-17-2023
1204 of 1241
10 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION
PROGRAM
Policy No. 7
HEALTH BENEFITS PLAN ‐ CITY
CONTRIBUTION
It is the policy of the City of Cupertino to provide group hospital and medical insurance under which the elected official positions and their dependents may be covered. The purpose of this program is to promote and preserve the health of employees and their families through comprehensive health plans available only through employer sponsorship.
Although the premium cost for the insurance provided remains the ultimate responsibility of the employee in these positions, the City shall contribute the amounts listed below towards the premium or pay the full cost of the premium if less than the stated amounts. If the premium amounts for any employee covered by this policy are less than the amounts listed below per month, the difference between the premium amount and the stated amounts will be retained by the City.
Effective
January 1, 2020
City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 848.87 126.78 975.65
Employee +1 1,443.09 126.78 1,569.87
Employee +2 1,876.01 126.78 2,002.79
January 1, 2021 City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 891.32 126.78 1,018.10
Employee +1 1,515.24 126.78 1,642.02
Employee +2 1,969.81 126.78 2,096.59
January 1, 2022 City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 935.88 126.78 1,062.66
Employee +1 1,591.01 126.78 1,717.79
Employee +2 2,068.31 126.78 2,195.09
1205
CC 01-17-2023
1205 of 1241
11 Health In‐Lieu Payments
City agrees to pay a monthly amount of three hundred seventy‐five ($375.00) per month to the employee who can demonstrate that they have equivalent health coverage through their spouse, parent, or other group coverage and who request this cash payment in lieu of health insurance coverage.
*Dental Coverage: Effective the first month after Council adoption of MOU, dental coverage is capped at $2,500.00 per dependent per annual plan year for the term of this contract. .
Adopted by Action of
the City Council
July, 2013, October 2016, July 2019, December 2019, January, 2023 1206
CC 01-17-2023
1206 of 1241
12 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 9
LIFE INSURANCE
It is the policy of the City of Cupertino to provide life insurance benefits to the elected officials to a maximum of $16,000.
The elected officials may enroll in the life insurance program offered if eligible under the contract provisions of the policy and the personnel rules of the City. The full cost of premiums for these programs shall be paid by the City for such individuals.
Adopted by Action of
the City Council
July, 2013
1207
CC 01-17-2023
1207 of 1241
13 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 10
DEFERRED COMPENSATION
It is the policy of the City of Cupertino to provide equitable current compensation and reasonable retirement security for the elected officials for services performed for the City. The City participates in the California Public Employees’ Retirement System (PERS) and deferred compensation plans have been established. Both the elected official and City may make contributions from current earnings to these plans. The purpose of this policy is to promote means by which compensation may be provided in such manner and form to best meet the requirements of the City and the needs of the elected officials. .
The City shall maintain and administer means by which the elected officials in these positions may defer portions of their current earnings for future utilization. Usage of such plans shall be subject to such agreements, rules and procedures as are necessary to properly administer each plan. Individual contributions to such plans may be made in such amounts as felt proper and necessary to the elected official. The City contributions shall be as determined by the CityCouncil.
Adopted by Action of
the City Council
July, 2013
1208
CC 01-17-2023
1208 of 1241
14 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 11
PUBLIC EMPLOYEES’ RETIREMENT SYSTEM CONTRIBUTION
A. Council Members occupying office on or before December 29, 2012 Only:
For Council Members occupying office on or before December 29, 2012, the City has contracted with CalPERS for a 2.7% @55 retirement formula.
Effective in the first full pay period in July 2017, each employee shall pay the full 8.0% of applicable salary of the employee’s contribution towards CalPERS.
B. Council Members occupying office on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations Only.
For Council Members hired on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations only the City has contracted with CalPERS for a 2.0% @ 60 retirement formula, three year average compensation
Effective January 1, 2017, the City shall not pay the employee’s contribution rate to the California Public Employees Retirement System (CalPERS) and each employee shall pay the full 7% of applicable salary of the employee’s contribution towards CalPERS.
C. For Council members occupying office on of after January 1, 2013, or former CalPERS employees that do not qualify as Classic employees hired by the City of Cupertino on or after January 1, 2013
For Council Members occupying office on or after January 1, 2013 CalPERS has by statute implemented a 2% @ 62 formula, three year average and employees in this category shall pay 50% of the normal cost rate as determined by CalPERS.
Adopted by Action of
the City Council
July, 2013, October
1209
CC 01-17-2023
1209 of 1241
15 2016, July 2019
1210
CC 01-17-2023
1210 of 1241
16 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 12
DENTAL INSURANCE ‐ CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide dental insurance under which the elected official positions and their dependents may be covered.
The premium cost for the insurance provided by the City shall not exceed $126.78* per month per individual. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with Personnel Rules of the City and the provisions of the contract for such insurance between the City and carrier or carriers. *Dental Coverage: Effective the first month after Council adoption of agreement, dental coverage is capped at $2,500.00 per dependent per annual plan year for the term of this contract.
Adopted by Action of
City Council
July, 2013, October 2016, July 2019
1211
CC 01-17-2023
1211 of 1241
17 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 14
EMPLOYEE ASSISTANCE PROGRAM
It is the policy of the City of Cupertino to provide an Employee Assistance Program for the benefit of the elected officials and their eligible dependents. The purpose of this program is to provide professional assistance and counseling concerning financial, legal, pre‐retirement, and other matters of a personal nature.
Adopted by Action of the City Council
July, 2013
1212
CC 01-17-2023
1212 of 1241
18 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 17
VISION INSURANCE – CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide vision insurance under which employees and their dependents may be covered.
The premium cost for the insurance provided by the City shall not exceed $14.94 per month per employee. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with the provisions of the contract between the City and carrier or carriers providing vision insurance coverage, Adopted by Action of the City Council
July, 2013
1213
CC 01-17-2023
1213 of 1241
19 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 18
Technology Policy
Each City Councilmember is provided a technology allowance in the amount of $4,000 per four‐year term. Technology equipment includes, but is not limited to, desktop PD, laptop, tablet, cell phone, printer, and Microsoft Office suite. Purchases shall be consistent with the City’s Council Technology Policy.
An amount not to exceed $100 per month (non‐taxable) shall be reimbursed for monthly service charges (i.e. phone and data) for equipment purchased under this policy.
Purpose
This policy establishes guidelines and standards regarding the provision of technology hardware and software for Councilmembers.
Scope and Applicability
This policy applies to all City Councilmembers for the provision and maintenance of City issued technology hardware and software This technology is in addition to City technology equipment and software residing within the Mayorʹs and Councilʹs office at City Hall.
Technology Provision
To facilitate communications with citizens, staff and other Councilmembers, each Councilmember may elect to be issued the following technology hardware at the beginning of each term.
1 Laptop
1 Docking Station
1 Monitor
1 Webcam
1 Keyboard & Mouse
1 Phone with Voice/Data Plan
1214
CC 01-17-2023
1214 of 1241
20 Each Councilmember’s issued laptop will have the following additional software applications:
Office productivity platform, e.g., Microsoft O365
Cybersecurity Tools, e.g.., end point protection and multifactor authentication Video Conferencing, e.g., Zoom
Each Councilmember’s issued phone will have the following additional software applications
Office productivity platform
Cybersecurity Tools
Video Conferencing
Issued technology hardware and software will meet current City hardware and software standards to ensure proper security, maintenance, and support.
Councilmembers who wish to not use City issued equipment must provide written acknowledgement that the technology they will use has current antivirus software and all software applications are up to date from a cyber security standpoint.
Councilmembers use the issued equipment for the performance of official City business. Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies.
Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department. City equipment and/or software is not available for purchase.
City Support
Innovation & Technology staff are solely responsible to provide technical support and maintenance for issued equipment and may be reached at [email protected] or (408) 777‐3381. If required, Councilmembers shall bring their equipment to City Hall for repair and/or service.
Adopted by Action of the City Council
July, 2019, January, 2023
1215
CC 01-17-2023
1215 of 1241
21 City of Cupertino
City Council
and
Planning Commission
Compensation
Effective January 1, 2017
1216
CC 01-17-2023
1216 of 1241
22 CITY OF CUPERTINO CITY COUNCIL
AND PLANNING COMMISSION
EFFECTIVE January 1, 2017
The salaries, wages or rates of pay for members of the City Council and Planning Commission are set forth below. Only the City Council can modify these rates.
Members of the City Council $737.54/month
Members of the Planning Commission* $50.00/meeting (maximum $200 monthly) Effective first full pay period in July 2017
Members of the City Council $743.07/month
Members of the Planning Commission* $50.00/meeting (maximum $200 monthly) *Benefits as set forth in this document do not apply to members of the Planning Commission.
1217
CC 01-17-2023
1217 of 1241
1 Exhibit B
City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 1
PROGRAM PURPOSE AND DEFINITIONS FOR ELIGIBILITY
It is City of Cupertino policy that those certain persons holding positions hereinafter defined and designated as elected official positions shall be eligible for participation under the Elected Officials Compensation Program as hereby adopted by action of the City Council and as same may be amended or as otherwise modified from time to time.
Eligibility for inclusion with this Compensation program is limited to persons holding positions as elected officials. These are designated by the voters and may be modified as circumstances warrant.
The position in the following classification has been designated as elected official.
ELECTED OFFICIAL CLASSIFICATIONS:
Classification Title City
Council Member
Adopted by Action of the City Council,
July 2013
1218
CC 01-17-2023
1218 of 1241
2 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 2
SALARY SCHEDULE
As rates of pay are set forth under the Cupertino Municipal Code 2.16.020, and hereby adopted by action of the City Council, so are those rates of pay included herein as a part of this Compensation program. The inclusion herein of said rates and schedules does not affect any effective dates or otherwise reflect on the approval processes required but is shown as an integral part of this Program for completeness of record.
Adopted by Action of the City Council
July, 2013, October 2016
1219
CC 01-17-2023
1219 of 1241
3 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 3
TRAINING AND CONFERENCES
I. POLICY
It is City of Cupertino policy that members of the City Council and the Council’s commissions and committees, shall be reimbursed or receive a direct advance according to the schedules, terms and conditions as set forth herein for the expenses authorized below. This policy is established in accordance with California Government Code Sections 53232.2 and 53232.3.
III. AUTHORIZED EXPENSES
The City Council and their commission and committee members can receive reimbursements or advances toward actual and necessary expenses incurred by participating in the following activities or events:
1. Communicating with representatives of regional, state and national government on City adopted policypositions;
2. Attending seminars, conferences, and training to improve skill and information levels;
3. Participating in regional, state and national organizations whose activities affect the City’s interests (such as the League of California Cities);
4. Attending International Conferences, budget limited to $2,500 per fiscal year, provided there is a benefit to the City;
5. Attending City events;
1. Attending functions of other local civic or community organizations where there is a clear nexus between the event and the member’s attendance as an official representative of the City. Purely social events, service club dues and meals, and political or charitable contributions or events would be excluded. For purposes of this section, reimbursable fundraisers and events include, but are not limited to, Cupertino Union School District, Fremont Union High School District, Foothill‐ De Anza Community College District, Silicon Valley Leadership Group, Cupertino American Cancer Society (ACS) Relay for Life and Cupertino Chamber of Commerce activities.
1220
CC 01-17-2023
1220 of 1241
4 The City will not reimburse or advance payment toward expenses including, but not limited to:
1. The personal portion of any trip;
2. Family expenses, including those of a partner when accompanying Council or commission member on City related business, as well as child or pet related expenses.
3. Entertainment expenses, including theatre, shows, movies, sporting events, golf, spa treatments, etc.
4. Meals and entertainment paid on behalf of third parties outside of the City;
5. Gifts of any kind for any purpose;
6. Alcoholic beverages;
7. Non‐mileage personal automobile expenses including repairs, insurance, gasoline, traffic citations; and
8. Personal losses incurred while on City business.
IV. BUDGETARY LIMITATIONS
Reimbursement or advancement of expenses shall not exceed budgetary limitations.
Changes in appropriations will be done through the budget process.
V. REIMBURSEMENT AND ADVANCE SCHEDULE
A. Intent
This schedule is written with the intent that the City Councilmember, commissioner, or committee member will make every effort to find the lowest possible cost to the City for traveling on City business. For example, if paying for parking at the airport is less expensive than paying for a taxi or airport shuttle, then officials should drive their car and park at the airport; or if renting a car is lower than taking taxis at the out‐of‐town location, then a car should be rented. Air reservations should be booked in advance to obtain discounted fares. The following procedures apply whether the expense is being paid through a reimbursement or a direct advance.
1221
CC 01-17-2023
1221 of 1241
5 B. Local Area
The local area is defined to be within Santa Clara and San Mateo Counties and within a 40 mile distance from Cupertino when traveling to Alameda County.
C. Registration
The City will pay the registration fee for authorized attendance at a convention, conference, seminar or meeting.
D. Transportation
The City will pay transportation costs on the basis of the lowest cost intent stated in paragraph A. Eligible transportation costs include airfare (with coach fare being the maximum), van or taxi service to and from the attendee’s home and airport, destination or airport parking charges, taxi and shuttle services at the out‐of‐town location, trains, tolls, or rental cars. Use of a personal automobile for City business shall be reimbursed or advanced at the rate per mile in effect for such use, except in no case shall it exceed air coach fare if the vehicle is being used for getting to the destination. Government or group rates offered by a provider of transportation must be used whenavailable.
E. Lodging
Hotel or lodging expenses of the City official resulting from the authorized event or activity defined in this policy will be reimbursed or advanced if the lodging and event occur outside the local area. Not covered will be lodging expenses related to person(s) who are accompanying the City member, but who themselves are not on City business.
In this instance, for example, the difference between single and multiple occupancy rates for a room will not be reimbursed.
Where the lodging is in connection with a conference or other organized educational activity, City‐paid lodging costs shall not exceed the maximum group rate published by the conference or activity sponsor, providing that lodging at the group rate is available at the time of booking. If the group rate at the conference hotel is not available, then the non‐conference lodging policy described in the next paragraph should be followed to find another comparable hotel.
Where lodging is necessary for an activity that is not related to a conference or other organized educational activity, reimbursement or advances shall be limited to the actual cost of the room at a group or government rate. In the event that a group or government 1222
CC 01-17-2023
1222 of 1241
6 rate is not available, lodging rates that do not exceed the median price for lodging for that area and time period listed on travel websites like www.hotels.com, www.expedia.com or an equivalent service shall be eligible for reimbursement or advancement.
F. Meals
1. No Conference
The actual cost of a meal can be claimed, within a standard of reasonableness, but receipts must be kept and submitted for the expense incurred.
2. As Part of a Conference
When City officials are attending a conference or other organized educational activity, they shall be reimbursed or advanced for meals not provided by the activity, on an actual cost basis. The actual cost rate shall follow the rules described in the meals with no conference paragraph.
G. Other Expenses
Payments toward or reimbursement of other expenses related to authorized activities or events shall be limited to the actual costs consistent with the application of reasonable standards. Receipts must be kept and submitted for all expenses.
VI. DIRECT CASH ADVANCE POLICY
From time to time, it may be necessary for a City official to request a direct cash advance to cover anticipated expenses while traveling or doing business on the City’s behalf. Such request for an advance should be submitted to the City Manager or Department Head no less than seven days prior to the need for the advance with the following information: 1) Purpose of the expenditure; 2) The anticipated amount of the expenditure (for example, hotel rates, meal costs, and transportation expenses); and 3) The dates of the expenditure.
An accounting of expenses and return of any unused advance must be reported to the City within 30 calendar days of the official’s return on the expense report described in Section VII.
1223
CC 01-17-2023
1223 of 1241
7 VII. EXPENSE REPORT REQUIREMENTS
All expense reimbursement requests or final accounting of advances received must be approved by the City Manager or Department Head, on forms determined by the Finance Department, within 30 calendar days of an expense incurred, accompanied by a business purpose for all expenditures and a receipt for each item other than mileage. The report will be a public record subject to disclosure under the Public Records Act.
VIII. REPORTS TO CITY COUNCIL OR COMMISSIONS
At the next regular City Council or commission meeting, each councilmember or commissioner shall briefly report on publicly noticed meetings attended at City expense.
If multiple members attended the meeting, a joint report may bemade.
IX. POLICY VIOLATIONS
Violations of this policy including falsifying expense reports may result in any or all of the following: (1) loss of reimbursement privileges, (2) demand for restitution to the City, (3) civil penalties of up to $1,000 per day and three times the value of the resources used, and 4) prosecution for misuse of public resources.
Revised 7/83, 7/85, 7/87, 7/88, 7/91, 7/92, 12/07, 7/10 1224
CC 01-17-2023
1224 of 1241
8 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 4
MILEAGE REIMBURSEMENTS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be compensated fairly for the use of personal automotive vehicles on City business. Those persons who occasionally are required to use their personal automobiles for City business shall be reimbursed for such use at the established IRS rates. Submission of reimbursement requests must be approved by the City Manager.
Adopted by Action of the City Council
July, 2013
1225
CC 01-17-2023
1225 of 1241
9 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 5
ASSOCIATION MEMBERSHIPS AND
PROFESSIONAL PUBLICATIONS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be entitled to City sponsored association memberships as well as receiving subscriptions to professional and technical publications. Such sponsorship, however, shall be conditioned upon the several factors as set forth below.
Each association for which membership is claimed must be directly related to the field of endeavor of the person to be benefited. Each claim for City sponsored membership shall be submitted with their concurrence to the City Manager for approval.
Subscriptions to or purchase of professional and technical publications may be provided at City expense when such have been authorized by the City Manager providing the subject matter and material generally contained therein are related to municipal governmental operations.
Adopted by Action of the City Council
July, 2013
1226
CC 01-17-2023
1226 of 1241
10 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION
PROGRAM
Policy No. 7
HEALTH BENEFITS PLAN ‐ CITY
CONTRIBUTION
It is the policy of the City of Cupertino to provide group hospital and medical insurance under which the elected official positions and their dependents may be covered. The purpose of this program is to promote and preserve the health of employees and their families through comprehensive health plans available only through employer sponsorship.
Although the premium cost for the insurance provided remains the ultimate responsibility of the employee in these positions, the City shall contribute the amounts listed below towards the premium or pay the full cost of the premium if less than the stated amounts. If the premium amounts for any employee covered by this policy are less than the amounts listed below per month, the difference between the premium amount and the stated amounts will be retained by the City.
Effective
January 1, 2020
City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 848.87 126.78 975.65
Employee +1 1,443.09 126.78 1,569.87
Employee +2 1,876.01 126.78 2,002.79
January 1, 2021 City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 891.32 126.78 1,018.10
Employee +1 1,515.24 126.78 1,642.02
Employee +2 1,969.81 126.78 2,096.59
January 1, 2022 City Max Health
Contribution
City Max *Dental
Contribution
City Total Max
Contribution
Employee 935.88 126.78 1,062.66
Employee +1 1,591.01 126.78 1,717.79
Employee +2 2,068.31 126.78 2,195.09
1227
CC 01-17-2023
1227 of 1241
11 *Dental Coverage: Effective the first month after Council adoption of MOU, dental coverage is capped at $2,500.00 per dependent per annual plan year for the term of this contract. .
Adopted by Action of the City Council
July, 2013, October 2016, July 2019,
December 2019, January, 2023
1228
CC 01-17-2023
1228 of 1241
12 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 9
LIFE INSURANCE
It is the policy of the City of Cupertino to provide life insurance benefits to the elected officials to a maximum of $16,000.
The elected officials may enroll in the life insurance program offered if eligible under the contract provisions of the policy and the personnel rules of the City. The full cost of premiums for these programs shall be paid by the City for such individuals.
Adopted by Action of the City Council
July, 2013
1229
CC 01-17-2023
1229 of 1241
13 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 10
DEFERRED COMPENSATION
It is the policy of the City of Cupertino to provide equitable current compensation and reasonable retirement security for the elected officials for services performed for the City. The City participates in the California Public Employees’ Retirement System (PERS) and deferred compensation plans have been established. Both the elected official and City may make contributions from current earnings to these plans. The purpose of this policy is to promote means by which compensation may be provided in such manner and form to best meet the requirements of the City and the needs of the elected officials. .
The City shall maintain and administer means by which the elected officials in these positions may defer portions of their current earnings for future utilization. Usage of such plans shall be subject to such agreements, rules and procedures as are necessary to properly administer each plan. Individual contributions to such plans may be made in such amounts as felt proper and necessary to the elected official. The City contributions shall be as determined by the CityCouncil.
Adopted by Action of the City Council
July, 2013
1230
CC 01-17-2023
1230 of 1241
14 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 11
PUBLIC EMPLOYEES’ RETIREMENT SYSTEM CONTRIBUTION
A. Council Members occupying office on or before December 29, 2012 Only:
For Council Members occupying office on or before December 29, 2012, the City has contracted with CalPERS for a 2.7% @55 retirement formula.
Effective in the first full pay period in July 2017, each employee shall pay the full 8.0% of applicable salary of the employee’s contribution towards CalPERS.
B. Council Members occupying office on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations Only.
For Council Members hired on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations only the City has contracted with CalPERS for a 2.0% @ 60 retirement formula, three year average compensation
Effective January 1, 2017, the City shall not pay the employee’s contribution rate to the California Public Employees Retirement System (CalPERS) and each employee shall pay the full 7% of applicable salary of the employee’s contribution towards CalPERS.
C. For Council members occupying office on of after January 1, 2013, or former CalPERS employees that do not qualify as Classic employees hired by the City of Cupertino on or after January 1, 2013
For Council Members occupying office on or after January 1, 2013 CalPERS has by statute implemented a 2% @ 62 formula, three year average and employees in this category shall pay 50% of the normal cost rate as determined by CalPERS.
Adopted by Action of the City Council
July, 2013, October 2016, July 2019
1231
CC 01-17-2023
1231 of 1241
15 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 12
DENTAL INSURANCE ‐ CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide dental insurance under which the elected official positions and their dependents may be covered.
The premium cost for the insurance provided by the City shall not exceed $126.78* per month per individual. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with Personnel Rules of the City and the provisions of the contract for such insurance between the City and carrier or carriers. *Dental Coverage: Effective the first month after Council adoption of agreement, dental coverage is capped at $2,500.00 per dependent per annual plan year for the term of this contract.
Adopted by Action of City Council
July, 2013, October 2016, July 2019
1232
CC 01-17-2023
1232 of 1241
16 City of Cupertino
ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 14
EMPLOYEE ASSISTANCE PROGRAM
It is the policy of the City of Cupertino to provide an Employee Assistance Program for the benefit of the elected officials and their eligible dependents. The purpose of this program is to provide professional assistance and counseling concerning financial, legal, pre‐retirement, and other matters of a personal nature.
Adopted by Action of the City Council
July, 2013
1233
CC 01-17-2023
1233 of 1241
17 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 17
VISION INSURANCE – CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide vision insurance under which employees and their dependents may be covered.
The premium cost for the insurance provided by the City shall not exceed $14.94 per month per employee. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with the provisions of the contract between the City and carrier or carriers providing vision insurance coverage, Adopted by Action of the City Council
July, 2013
1234
CC 01-17-2023
1234 of 1241
18 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 18
TECHNOLOGY POLICY
Purpose
This policy establishes guidelines and standards regarding the provision of technology hardware and software for Councilmembers.
Scope and Applicability
This policy applies to all City Councilmembers for the provision and maintenance of City issued technology hardware and software This technology is in addition to City technology equipment and software residing within the Mayor's and Council's office at City Hall.
Technology Provision
To facilitate communications with citizens, staff and other Councilmembers, each Councilmember may elect to be issued the following technology hardware at the beginning of each term.
• 1 Laptop
• 1 Docking Station
• 1 Monitor
• 1 Webcam
• 1 Keyboard & Mouse
• 1 Phone with Voice/Data Plan
Each Councilmember’s issued laptop will have the following additional software applications:
• Office productivity platform, e.g., Microsoft O365
• Cybersecurity Tools, e.g.., end point protection and multifactor authentication • Video Conferencing, e.g., Zoom
1235
CC 01-17-2023
1235 of 1241
19 Each Councilmember’s issued phone will have the following additional software applications
• Office productivity platform
• Cybersecurity Tools
• Video Conferencing
Issued technology hardware and software will meet current City hardware and software standards to ensure proper security, maintenance, and support.
Councilmembers who wish to not use City issued equipment must provide written acknowledgement that the technology they will use has current antivirus software and all software applications are up to date from a cyber security standpoint.
Councilmembers use the issued equipment for the performance of official City business. Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies.
Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department. City equipment and/or software is not available for purchase.
City Support
Innovation & Technology staff are solely responsible to provide technical support and maintenance for issued equipment and may be reached at [email protected] or (408) 777-3381. If required, Councilmembers shall bring their equipment to City Hall for repair and/or service.
Adopted by Action of the City Council
July, 2019, January, 2023
1236
CC 01-17-2023
1236 of 1241
20 City of Cupertino
City Council
and
Planning Commission
Compensation
Effective January 1, 2017
1237
CC 01-17-2023
1237 of 1241
21 CITY OF CUPERTINO CITY COUNCIL
AND PLANNING COMMISSION
EFFECTIVE January 1, 2017
The salaries, wages or rates of pay for members of the City Council and Planning Commission are set forth below. Only the City Council can modify these rates.
Members of the City Council $737.54/month
Members of the Planning Commission* $50.00/meeting (maximum $200 monthly) Effective first full pay period in July 2017
Members of the City Council $743.07/month
Members of the Planning Commission* $50.00/meeting (maximum $200 monthly) *Benefits as set forth in this document do not apply to members of the Planning Commission.
1238
CC 01-17-2023
1238 of 1241
RESOLUTION NO. 23‐XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING THE ELECTED OFFICIALS’ COMPENSATION PROGRAM
WHEREAS, the City Council desires to amend the Elected Officials’ Compensation Program.
NOW, THEREFORE, BE IT RESOLVED that the Elected Officials’ Compensation Program be amended which are incorporated in this resolution by this reference and attached as Exhibit B.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 17th day of January 2023 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: APPROVED:
_________________________ ___________________________________ Kirsten Squarcia, City Clerk Hung Wei, Mayor, City of Cupertino
1239
CC 01-17-2023
1239 of 1241
Council
Technology
Policy
Citywide Policy Manual
Policy #
Attachments:
N/A
Effective Date:
December 12, 2022
Responsible Department:
Innovation & Technology
Related Policies & Notes:
This policy supersedes previous Council Technology Polices from 2005, 2012, and 2018 Purpose
This policy establishes guidelines and standards regarding the provision of technology hardware and software for Councilmembers.
Scope and Applicability
This policy applies to all City Councilmembers for the provision and maintenance of City issued technology hardware and software This technology is in addition to City technology equipment and software residing within the Mayor's and Council's office at City Hall.
Technology Provision
To facilitate communications with citizens, staff and other Councilmembers, each Councilmember may elect to be issued the following technology hardware at the beginning of each term.
• 1 Laptop
• 1 Docking Station
• 1 Monitor
• 1 Webcam
• 1 Keyboard & Mouse
• 1 Phone with Voice/Data Plan
Each Councilmember’s issued laptop will have the following additional software applications:
• Office productivity platform, e.g., Microsoft O365
• Cybersecurity Tools, e.g.., end point protection and multifactor authentication • Video Conferencing, e.g., Zoom
1240
CC 01-17-2023
1240 of 1241
Each Councilmember’s issued phone will have the following additional software applications
• Office productivity platform
• Cybersecurity Tools
• Video Conferencing
Issued technology hardware and software will meet current City hardware and software standards to ensure proper security, maintenance, and support.
Councilmembers who wish to not use City issued equipment must provide written acknowledgement that the technology they will use has current antivirus software and all software applications are up to date from a cyber security standpoint.
Councilmembers use the issued equipment for the performance of official City business.
Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies.
Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department. City equipment and/or software is not available for purchase.
City Support
Innovation & Technology staff are solely responsible to provide technical support and maintenance for issued equipment and may be reached at [email protected] or (408) 777-3381. If required, Councilmembers shall bring their equipment to City Hall for repair and/or service.
Submitted By: Approved By:
Printed Name: Bill Mitchell Printed Name: Pamela Wu
Title: CTO Title: City Manager
Signature: Signature:
Date: December 11, 2022 Date:
1241