E-8 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP

1.2 SCOPE OF WORK
As presented in our Agreement, the scope of work performed for this Phase I ESA included the following:
• A reconnaissance of the Site to note readily observable indications of significant releases of hazardous materials to structures, soil, soil vapor or groundwater . • Drive-by observation of adjoining properties to note readily apparent activities involving hazardous materials that have or could significantly impact the Site. • Acquisition and review of a regulatory agency database report of public records for the general area of the Site to evaluate potential impacts to the Site from reported contamination incidents on-Site or at nearby facilities . • Review of readily available information on file at selected governmental agencies to help evaluate past and current Site use and hazardous materials management practices. • Historical research including review of readily available maps and aerial photographs to help evaluate past and current Site uses.
• Interviews with persons reportedly knowledgeable of current and/or prior Site uses, including the current Site owner and occupant(s) .
• Preparation of a written report summarizing our findings and recommendations .

The limitations for the Phase I ESA are presented in Section 10.

1.3 ASSUMPTIONS
In preparing this Phase I ESA, Cornerstone can neither warrant nor guarantee that records obtained from or prepared by other parties, such as, but not limited to, regulatory agency records, interview responses, maps, related documents, and environmental reports prepared by others are accurate or complete. Cornerstone relied on the information obtained during this study unless we had actual knowledge that the information was incorrect or unless it was obvious that the information was incorrect based on other information obtained. We also assumed that the boundaries of the Site, based on information provided by David J. Powers & Associates , are as shown on Figure 2. We have not independently verified the accuracy or completeness of any data received.

1.4 ENVIRONMENTAL PROFESSIONAL
This Phase I ESA was performed by Stason I. Foster, P.E. and Ron L. Helm, C.E.G. We declare that, to the best of our professional knowledge and belief, we meet the definition of Environmental Professional as defined in§ 312.10 of 40 C.F.R. Part 312. We have the specific qualifications based on education, training and experience to assess a property of the nature, history and setting of the subject property. We have developed and performed the All Appropr iate Inquiries in general conformance with the standards and practices set forth in 40 CFR Part 312.

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
Page2
Appendix E Phase 1 Environmental Site Assessment E-9
Is!

CORNERSTONE

EARTH GROUP
SECTION 2: SITE DESCRIPTION
This section describes the Site as of the date of this Phase I ESA. The location of the Site is shown on Figures 1 and 2. Tables 1 through 3 summarize general characteristics of the Site and adjoining properties. The Site is described in more detail in Section 7, based on our on-Site observations.

2.1 LOCATION AND OWNERSHIP
Table 1 describes the physical location, and ownership of the Site, based on information provided by David J. Powers & Associates.

Table 1. Location and Ownership
Assessor's Approximate
Parcel No. (APN) Reported Address/Location Owner Lot Size 326-29-006 21251 Steven Creek Boulevard* Citv of Cupertino 14.5 acres 326-54-041 10185 North Stelling Road City of Cupertino 7.2 acres 326-27-033 N/A Citv of Cupertino 0.4 acres
* 21121 Steven Creek Boulevard also was identified as an address associated with the Site and was researched during this Phase I ESA.

2.2 CURRENT/PROPOSED USE OF THE SITE
The current and proposed uses of the Site are summarized in Table 2.

Table 2. Current and Proposed Uses
Current Use Cupertino Memorial Park, Quinlan Community Center and Cupertino Senior Center
Proposed Use Public Park and Open Space , Public Facilities , Transportation, etc.

2.3 SITE SETTING AND ADJOINING PROPERTY USE
Land use in the general Site vicinity appears to be primarily residential. During the Site visit, adjoining properties were observed from the Site and from adjacent public thoroughfares.

Based on our Site vicinity reconnaissance, adjoining property uses are summarized below in Table 3. No features, activities, uses or conditions on the adjoining properties were observed that are considered indicative of Recognized Environmental Conditions at the Site.

Table 3. Adjoining Property Uses
North Residential
South De Anza Colleqe (across Stevens Creek Boulevard)
East Residential and Cupertino Sports Complex
West Residential
SECTION 3: USER PROVIDED INFORMATION
The ASTM standard defines the User as the party seeking to use a Phase I ESA to evaluate the presence of Recognized Environmental Conditions associated with a property. For the purpose of this Phase I ESA, the User is David J. Powers & Associates. The "All Appropriate Inquiries" Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 3 ends

-
E-10 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP
Final Rule (40 CFR Part 312) requires specific tasks be performed by or on behalf of the party seeking to qualify for Landowner Liability Protection under CERCLA (i.e., the User).

Per the ASTM standard, if the User has information that is material to Recognized Environmental Conditions in connection with the Site, such information should be provided to the Environmental Professional. This information includes: 1) specialized knowledge or experience of the User, 2) commonly known or reasonably ascertainable information within the local community, and 3) knowledge that the purchase price of the Site is lower than the fair market value due to contamination . A search of title records for environmental liens and activity and use limitations also is required.

3.1 ENVIRONMENTAL LIENS OR ACTIVITY AND USE LIMITATIONS An environmental lien is a financial instrument that may be used to recover past environmental cleanup costs. Activity and use limitations (AULs) include other environmental encumbrances, such as institutional and engineering controls. Institutional controls (ICs) are legal or regulatory restrictions on a property's use, while engineering controls (ECs) are physical mechanisms that restrict property access or use.

The regulatory agency database report described in Section 4.1 did not identify the Site as being in 1) US EPA databases that list properties subject to land use restrictions (i.e., engineering and institutional controls) or Federal Superfund Liens or 2) lists maintained by the California Department of Toxic Substances Control (DTSC) of properties that are subject to AULs or environmental liens where the DTSC is a lien holder.

ASTM E1527-21 categorizes the requirement to conduct a search for Environmental Liens and AULs as a User responsibility. A search of land title records for environmental liens and AULs was not within the scope of the current Phase I ESA and the User did not provide such search results to Cornerstone .

3.2 SPECIALIZED KNOWLEDGE AND COMMONLY KNOWN OR REASONABLY

ASCERTAINABLE INFORMATION
Based on information provided by or discussions with David J. Powers & Associates, we understand that David J. Powers & Associates does not have specialized knowledge or experience , commonly known or reasonably ascertainable information regarding the Site, or other information that is material to Recognized Environmental Conditions .

SECTION 4: RECORDS REVIEW

4.1 STANDARD ENVIRONMENTAL RECORD SOURCES
Cornerstone conducted a review of federal, state and local regulatory agency database records provided by Environmental Data Resources (EDR) to evaluate the likelihood of contamination incidents at and near the Site. The database sources and the search distances are in general accordance with the requirements of ASTM E1527-21. A list of the database sources reviewed, a description of the sources, and a radius map showing the location of reported facilities relative to the project Site are attached in Appendix A.

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
Page4
Appendix E Phase 1 Environmental Site Assessment E-11
Is!

CORNERSTONE

EARTH GROUP
The purpose of the records review was to obtain reasonably available information to help identify Recognized Environmental Conditions . Accuracy and completeness of record information varies among information sources, including government sources. Record information is often inaccurate or incomplete . The Environmental Professional is not obligated to identify mistakes or insufficiencies or review every possible record that might exist with respect to the Site. The customary practice is to review information from standard sources that is reasonably ascertainable within reasonable time and cost constraints .

4.1.1 On-Site Database Listings
Memorial Park Ponds Repurposing was identified at the Site address on the California Integrated Water Quality System (CIWQS) database, a computer system used by the State and Regional Water Quality Control Boards to track information about places of environmental interest, manage permits and other orders, track inspections , and manage violations and enforcement activities . This listing appears to be associated recent construction activities involving the removal of decorative, concrete lined ponds at the park.

4.1.2 Adjoining Property Database Listings and Nearby Spill Incidents Based on the information presented in the agency database report, no off-Site spill incidents were reported that appear likely to significantly impact soil, soil vapor or groundwater beneath the Site. The potential for impact was based on our interpretation of the types of incidents, the locations of the reported incidents in relation to the Site and the assumed groundwater flow direction . A few businesses on adjoining properties were identified on regulatory agency databases relating primarily to regulatory filings associated with hazardous material use/storage, and generation or disposal of hazardous wastes. Such listings are common for commercial facilities in urban settings and are not indicative of hazardous material releases; thus, further review of records associated with these listings does not appear warranted.

4.2 ADDITIONAL ENVIRONMENTAL RECORD SOURCES
The following additional sources of readily ascertainable public information for the Site also were reviewed during this Phase I ESA.

4.2.1 City and County Agency File Review
Cornerstone obtained available files pertaining to the Site at the following public agencies: the Cupertino Building Department (BD), Santa Clara County Fire Department (SCCFD), and the Santa Clara County Department of Environmental Health (DEH).

The DEH and SCCFD indicated that they had no files pertaining to hazardous materials use at the Site.

Building Department files for 21251 Stevens Creek Boulevard contained permit records dated between 1999 and 2017 for construction of the existing Senior Center building and subsequent repairs and alterations. Permits dated between 2010 and 2016 were for cellular telephone antenna equipment installation. A 2022 permit was for the in-progress pond repurposing project at Memorial Park. The files additionally contained a 1980 Certificate of Occupancy for a former "Senor Citizen Building."
Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 5 ends

-
E-12 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP
Building Department files for 10185 North Stelling Road contained permit records dated between 1988 and 2021 associated with construction of the Quinlan Community Center and various subsequent alterations and repairs.

4.2.2 Geologic Energy Management Division Maps
To evaluate the presence of oil or gas wells on-Site and in the immediate Site vicinity, maps available on-line at the California Department of Conservation, Geologic Energy Management Division (CalGEM) website were reviewed. Review of the available map for the Site area did not show oil or gas wells on-Site or on the adjacent properties.

SECTION 5: PHYSICAL SETTING
We reviewed readily available geologic and hydrogeologic information to evaluate the likelihood that chemicals of concern released on a nearby property could pose a significant threat to the Site and/or its intended use.

5.1 RECENT USGS TOPOGRAPHIC MAP
A 2018 USGS 7.5 minute topographic map was reviewed to evaluate the physical setting of the Site. The Site's elevation is approximately 280 feet above mean sea level; topography in the vicinity of the Site slopes downward gently to the northeast towards the San Francisco Bay.

5.2 HYDROGEOLOGY
Based on our experience and information presented in the California Geotracker database pertaining to nearby properties, groundwater beneath the Site is likely present at depths of greater than 100 feet. Groundwater likely flows toward the northeast.

SECTION 6: HISTORICAL USE INFORMATION
The objective of the review of historical use information is to develop a history of the previous uses of the Site and adjoining properties in order to help identify the likelihood of past uses having led to Recognized Environmental Conditions at the Site. The ASTM standard requires the identification of all obvious uses of the Site from the present back to the Site's first developed use, or back to 1940, whichever is earlier, using reasonably ascertainable standard historical sources. The identification of obvious uses of adjoining properties also is required.

6.1 HISTORICAL SUMMARY
The historical sources reviewed are summarized below. The results of our review of these sources are summarized in Table 4.
■ Historical Aerial Photographs: We reviewed aerial photographs dated between 1939 and 2016 obtained from EDR of Shelton, Connecticut ; copies of aerial photographs reviewed are presented in Appendix B.
■ Historical Topographic Maps: We reviewed USGS 15-minute and 7.5-minute historic topographic maps dated 1897, 1899, 1902, 1943, 1947, 1948, 1953, 1961, 1968, 1973, Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
Page6
Appendix E Phase 1 Environmental Site Assessment E-13
Is!

CORNERSTONE

EARTH GROUP
1980, 2012, 2015 and 2018; copies of historic topographic maps reviewed are presented in Appendix B.
• Historical Fire Insurance Maps: EDR reported that the Site was not within the coverage area of fire insurance maps.

Table 4. Summary of Historical Source Information
Date Source Comments
1897, 1899, Topographic Site: Several small structures typical of residences and associated 1902, 1943, maps outbuildings are depicted on-Site . Orchards also are depicted on-Site 1947, 1948, on the maps dated from 1948 to 1968.
1953, 1961,
1968, 1973 Adjoining Properties: Small structures typical of residences are and 1980 depicted on some of the adjoining parcels. Orchards also are depicted on adjoining properties on the maps dated from 1943 to 1968. What appear to be residential developments are shown to the north and east by 1953 and to the west by 1973. De Anza College is shown to the south bv 1968.
1995 to Topographic Site: The Quinlan Community Center is shown to have been 2018 maps constructed on the eastern portion of the Site by 1995.

Adjoining Properties: De Anza College is shown to the south and other adjoining properties are shown within the urban developed area of Cuoertino.
1939 to Aerial Site: Shown to be occupied by orchards and what appear to be 1968 photographs several residences and associated outbuildings .

Adjoining Properties: Shown to be occupied mainly by orchards and what appear to be several residences and associated outbuildings. An increase in residential development is shown to the east by the 1950s.

De Anza College is shown to have been constructed to the south by 1968.
1974 Aerial Site: Grading and construction associated with Memorial Park facilities photograph (e.g., tennis courts and baseball field) is shown to be in progress on the northwestern portion of the Site. Residences and associated outbuildings, along with orchards are shown to remain on other portions of the Site.

Adjoining Properties: Orchards remain to the north and southeast.

De Anza College is shown to the south. Residential developments are shown to the east and west.
1982 to Aerial Site: A former building at the Cupertino Senior Center location is 2016 photographs shown to have been constructed by 1982 and Memorial Park facilities are shown on the western portion of the Site. Orchards are shown to remain on the eastern portion of the Site on the 1982 photograph; by 1991, the Quinlan Community Center is shown to have been constructed on the eastern portion of the Site. By 2006, the existing Cupertino Senior Center building is shown to have been constructed, replacing a former building .

Adjoining Properties: Development on adjoining properties appears generally similar to the existing conditions .

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 7 ends

-
E-14 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP

6.1.1 City Directory Review
To obtain additional information regarding past uses of the Site and adjoining properties, business directories including city, cross reference and telephone directories were reviewed, if available, at approximately five year intervals for the years spanning 1968 through 2017. A summary of the city directory listings for Site occupants is presented in Table 6. The listed business names at adjoining properties are not indicative of businesses that are typically associated with the use or storage of significant quantities of hazardous materials (e.g., gasoline stations, dry cleaners, manufacturing facilities , etc.). The acquired city directory report is presented in Appendix C.

Table 5. On-Site City Directory Listings
Date Occupant
10185 North Stellina Road
1992 Cupertino Community Services and Robert W. Quinlan Center 1995 Cupertino Community Services and Cupertino Historical Museum, Cupertino Recreation Department and Salvation Army
2000 Cuoertino Communitv Services and Cuoertino Historical Societv & Museum 2005 and 2010 Cupertino Historical Society, Cupertino Parks & Recreation and Quinlan Community Center
2014 and 2017 Cupertino Historical Society & Museum
21251 Stevens Creek Boulevard
1985 Cupertino Senior Center
1992 Cupertino Senior Community Center
1995 Cupertino Senior Citizen Center
2000 City of Cupertino City / Recreation
2005, 2010 and 2014 Cuoertino Senior Center
2017 City of Cupertino
SECTION 7: SITE RECONNAISSANCE
We performed a Site reconnaissance to evaluate current Site conditions and to attempt to identify Site Recognized Environmental Conditions. The results of the reconnaissance are discussed below. Additional Site observations are summarized in Table 6. Photographs of the Site are presented in Section 7.2.1.

7.1 METHODOLOGY AND LIMITING CONDITIONS
To observe current Site conditions (readily observable environmental conditions indicative of a significant release of hazardous materials), Cornerstone staff Stason I. Foster, P.E. visited the Site on September 26, 2022. The Site reconnaissance was conducted by walking representative areas of the Site, including the interiors of the on-Site structures , the periphery of the structures and the Site periphery. The Site also was observed from adjacent public thoroughfares. Cornerstone staff only observed those areas that were reasonably accessible , safe, and did not require movement of equipment , materials or other objects. Physical obstructions that limited our ability to view the ground surface at the Site included the existing buildings and associated paved vehicle drives and parking areas (typical of developed properties) .

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
Page8
Appendix E Phase 1 Environmental Site Assessment E-15
Is!

CORNERSTONE

EART H GROUP

7.2 OBSERVATIONS
At the time of our visit, the Site was developed with Cupertino Memorial Park, the Cupertino Senior Center, and the Quinlan Community Center.

The Cupertino Senior Center and Quinlan Community Center buildings were observed to consist of various rooms used for events, classes and activities, as well as general office space and kitchen facilities . Cupertino Historical Museum and a preschool facility also operated within the community center building.

Memorial Park was observed to consist of open space, tennis courts, athletic fields, and picnic and playground areas. Grading associated with a project to remove former concrete lined decorative ponds was observed to be in progress. A cellular telephone antenna tower and fenced equipment enclosure also were present.

Two wood-framed sheds with concrete floor slabs were observed within the park that contained grounds maintenance equipment. Hazardous materials observed within the sheds consisted primarily of gasoline that was stored in safety cans within a flammable materials storage cabinet, weed killer (Roundup®) contained in portable backpack pump sprayers and marking paint for sports fields.

Facility maintenance rooms were observed in both the Cupertino Senior Center and Quinlan Community Center buildings that contained paints and other common building maintenance supplies. General housekeeping within the facility maintenance rooms, as well as the grounds maintenance sheds, appeared orderly and no evidence of significant chemical spills was readily apparent.

Electricity and/or natural gas fuel sources appeared to be used for building heating/cooling purposes. Potable water appeared to be supplied by the local water service provider. The buildings presumably are connected to the publicly owned sanitary sewer system; no on-Site septic systems were obvious. On-Site storm water catch basins appeared to discharge via below ground piping to the City's storm water drainage system. Electrical transformer owned by PG&E were observed on concrete pads within the park and near the community center and senior center buildings. No evidence of transformer oil leaks was observed.

Table 6. Summary of Readily Observable Site Features
General Observation
Aboveground Storage Tanks
Aqricultural Wells
Air Emission Control Svstems
Boilers
Burnin!l Areas (waste burn pits or ash disposal areas)
Chemical Mixing Areas
Chemical Storaqe Areas
Draina!le Ditches
Drums, Totes, and Intermediate Bulk Containers
Elevators
Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-1 39-1
Comments
Not Observed
Not Observed
Not Observed
Not Observed
Not Observed
Not Observed
Observed as described above
Not Observed
Not Observed
Not Observed
Page9
-
E-16 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EART I-I GROUP
Table 6 (Continued). Summary of Readily Observable Site Features General Observation Comments
Emeraency Generators Not Observed
Equipment Maintenance Areas Not Observed
Fill Placement (i.e., fill used to build up the site elevations) Not Observed Groundwater Monitorina Wells Not Observed
Hoods and Ducting (associated with chemical use) Not Observed Hydraulic Vehicle or Eauipment Lifts Not Observed
Incinerators Not Observed
Petroleum Pipelines or Wells Not Observed
Pits, Ponds, or Laaoons . Not Observed
Railroad Lines Not Observed
Row Crops or Orchards Not Observed
Septic Systems or Cesspools Not Observed
Solid Waste Disposal Areas (other than municipal trash containers) Not Observed Stained Soil or Pavement Not Observed
Stains or Corrosion on Floors, Walls, or Ceilinas Not Observed Standing Surface Water or Pools Not Observed
Stockpiles of Soil or Debris Not Observed
Stressed Veaetation (unrelated to the lack of water) Not Observed Strong, Pungent, or Noxious Odors Not Observed
Sumps, Clarifiers, Oil-Water Separators, or similar structures Below grade grease interceptors were observed
near kitchen facilities
Transformers Observed as described above
Underground Storage Tanks Not Observed
Unidentified Substance Containers Not Observed
Vehicle Maintenance Areas Not Observed
Vehicle Wash Areas Not Observed
Wastewater Neutralization Systems Not Observed
The comment "Not Observed" does not warrant that these features are not present on-Site; 11 only mdIcates that these features were not readily observed during the Site visit.

7.2.1 Site Photographs
Photograph 1. View of the Quinlan Community Center
building.

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1
Photograph 2. Interior of Quinlan Community
Center.

Page 10 ends

Appendix E Phase 1 Environmental Site Assessment E-17
Is!

CORNERSTONE

EART H GROUP
Photograph 3. Interior of Quinlan Community Center.

Photograph 5. Interior of the Cupertino Senior Center .

Photograph 7. Memorial Park playground area.

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-1 39-1
Photograph 4. View of the Cupertino Senior Center
building.

Photograph 6. Memorial Park picnic area .

Photograph 8. Memorial Park (former pond area).

Page 11 ends

-
E-18 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EART I-I GROUP
Photograph 9. One of two grounds maintenance sheds at Photograph 10. Interior of grounds maintenance Memorial Park. shed.

SECTION 8: ENVIRONMENTAL QUESTIONNAIRE AND INTERVIEWS

8.1 ENVIRONMENTAL QUESTIONNAIRE/ CURRENT OWNER AND OCCUPANT

INTERVIEW
To help obtain information on current and historical Site use and use/storage of hazardous materials on-Site, we provided an environmental questionnaire for completion by the Site owner (City of Cupertino). The completed questionnaire is attached in Appendix D. The information provided on the questionnaire appears generally consistent with our on-Site observations and information obtained from other data sources. No information indicative of Recognized Environmental Conditions was reported on the questionnaire .

8.2 INTERVIEWS WITH PREVIOUS OWNERS AND OCCUPANTS
Contact information for previous Site owners and occupants was not provided to us. Therefore , interviews with previous Site owners and occupants could not be performed.

8.3 INTERVIEWS WITH STATE AND/OR LOCAL GOVERNMENT OFFICIALS Per the ASTM Standard, a reasonable attempt should be made to interview at least one staff member of any one of the following types of state and/or local government agencies: fire department , health department, building department , or other agency having jurisdiction over hazardous waste disposal or other environmental matters in the area.

The Cupertino Building Department, Santa Clara County Fire Department, and the Santa Clara County DEH were contacted during this study. The DEH is the Certified Unified Program Agency (CUPA) responsible for implementing California's Unified Hazardous Waste and Hazardous Materials Management regulatory program for properties within Cupertino; the Fire Department also is a Participating Agency (PA). Files pertaining to the Site were requested from each of these agencies; a summary of the information obtained was discussed in Section

4.2.1. Cupertino Memorial Park, 10185 North Stelling Road and 21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 12 ends

Appendix E Phase 1 Environmental Site Assessment E-19
Is!

CORNERSTONE

EARTH GROUP
SECTION 9: FINDINGS, OPINIONS, AND CONCLUSIONS (WITH

RECOMMENDATIONS)
Cornerstone performed this Phase I ESA in general conformance with ASTM E1527-21 to support David J. Powers & Associates in evaluation of Recognized Environmental Conditions.

Our findings , opinions and conclusions are summarized below.

9.1 HISTORICAL SITE USAGE
Based on the information obtained during this study, the Site historically was occupied by orchards, along with what appear to have been several residences and associated outbuildings .

During the mid-1970s, Memorial Park facilities (e.g., tennis courts and baseball field) were constructed on the western portion of the Site. A former senior center building was constructed at the southwest corner of the Site during the early 1980s. The existing Quinlan Community Center was constructed on the eastern portion of the Site during the late 1980s. The existing Cupertino Senior Center building was constructed in approximately 2000, replacing the former senior center building.

9.2 CHEMICAL STORAGE AND USE
Paints and other common building maintenance supplies were observed within facility maintenance rooms in both the Cupertino Senior Center and Quinlan Community Center buildings. Grounds maintenance sheds within Memorial Park were observed to contain gasoline that was stored in safety cans within a flammable materials storage cabinet, weed killer (Roundup®) contained in portable backpack pump sprayers and marking paint for sports fields.

General housekeeping within the facility maintenance rooms and the grounds maintenance sheds appeared orderly and no evidence of significant chemical spills was readily apparent.

9.3 AGRICULTURAL USE
The Site historically was used for agricultural purposes for several decades. Pesticides may have been applied to crops in the normal course of farming operations . Residual pesticide concentrations may remain in on-Site soil. If elevated concentrations of agricultural chemicals are present, mitigation or soil management measures may be required. We recommend performing soil sampling to evaluate if agricultural chemicals are present at concentrations that may pose a risk to human health. At agricultural properties, pesticides often were stored within structures such as barns or sheds. The recommended sampling should include an evaluation of these former structures, along with the agricultural field areas.

9.4 LEAD-BASED PAINT AND TERMITE CONTROL PESTICIDES
In 1978, the Consumer Product Safety Commission banned lead-containing paints and coatings sold for consumer use. Some lead-containing products, such as industrial coatings, however, are still allowed. Based on the age of the existing Cupertino Senior Center and Quinlan Community Center buildings, lead-containing paint is not likely to be present. Some of the Memorial Park structures (such a restrooms) appear to have been constructed during the 1970s and have greater potential for the presence of lead-containing paint. If demolition is planned, the removal of lead-containing paint is not required if it is bonded to the building materials .

However, if the lead-containing paint is flaking, peeling, or blistering, it should be removed prior to demolition. In either case, applicable OSHA regulations must be followed; these include Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 13 ends

-
E-20 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP
requirements for worker training, air monitoring and dust control, among others. Any debris or soil containing lead must be disposed appropriately .

Soil adjacent to structures, if painted with lead-containing paint, can become impacted with lead as a result of the weathering and/or peeling of painted surfaces. Soil near wood framed structures also can be impacted by pesticides historically used to control termites . No information was identified during this study documenting the use of lead based paint or termite control pesticides on-Site; however, if previously used, residual pesticide and lead concentrations may remain in on-Site soil. Lead and/or pesticides often are identified in soil near old residences and outbuildings , such as those historically located on-Site. We recommend that shallow soil at the former structure locations be evaluated for the possible presence of lead and pesticides.

9.5 ASBESTOS CONTAINING BUILDING MATERIALS (ACBMS)
Based on the age of the existing Cupertino Senior Center and Quinlan Community Center buildings, it is unlikely that these building materials contain asbestos. Some of the Memorial Park structures ( such a restrooms) appear to have been constructed during the 1970s and have greater potential for the presence of asbestos. If demolition, renovation, or re-roofing of the buildings is planned, an asbestos survey may be required by local authorities or National Emissions Standards for Hazardous Air Pollutants (NESHAP) guidelines . NESHAP guidelines require the removal of potentially friable ACBMs prior to building demolition or renovation that may disturb the ACBM.

9.6 IMPORTED SOIL
If the planned development will require importing soil for Site grading, we recommend documenting the source and quality of imported soil. The DTSC's October 2001 Clean Fill Advisory provides useful guidance on evaluating imported fill.

9.7 POTENTIAL ENVIRONMENTAL CONCERNS WITHIN THE SITE VICINITY Based on the information obtained during this study, no hazardous material spill incidents have been reported in the Site vicinity that would be likely to significantly impact the Site.

9.8 DATA GAPS
ASTM Standard E1527-21 requires the Environmental Professional to comment on significant data gaps that affect our ability to identify Recognized Environmental Conditions . A data gap is a lack of or inability to obtain information required by the ASTM Standard despite good faith efforts by the Environmental Professional to gather such information. A data gap by itself is not inherently significant; it only becomes significant if it raises reasonable concerns. No significant data gaps were identified during this Phase I ESA.

9.9 DATA FAILURES
As described by ASTM Standard E1527-21, a data failure occurs when all of the standard historical sources that are reasonably ascertainable and likely to be useful have been reviewed and yet the historical research objectives have not been met. Data failures are not uncommon when attempting to identify the use of a Site at five year intervals back to the first use or to 1940 Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 14 ends

Appendix E Phase 1 Environmental Site Assessment E-21
Is!

CORNERSTONE

EARTH GROUP
(whichever is earlier). The ASTM Standard requires the Environmental Professional to comment on the significance of data failures and whether the data failure affects our ability to identify Recognized Environmental Conditions . A data failure by itself is not inherently significant ; it only becomes significant if it raises reasonable concerns. No significant data failures were identified during this Phase I ESA.

9.10 RECOGNIZED ENVIRONMENTAL CONDITIONS
Cornerstone has performed a Phase I ESA in general conformance with the scope and limitations of ASTM E1527-21. This assessment identified the following Recognized Environmental Conditions 2.
• The Site historically was used for agricultural purposes. There is a potential that residual pesticides could remain in Site soil. If present, this soil may require appropriate management.
• Soil adjacent to structures that are painted with lead-containing paint can become impacted with lead as a result of the weathering and/or peeling of painted surfaces. Soil near wood-framed structures also can be impacted by pesticides historically used to control termites . There is a potential that residual lead and pesticide concentrations could remain in on-Site soil resulting from prior on-Site structures.

This assessment did not identify any Controlled Recognized Environmental Conditions 3 or Historical Recognized Environmental Conditions 4 associated with the Site.

SECTION 10: LIMITATIONS
Cornerstone performed this Phase I ESA to support David J. Powers & Associates in evaluation of Recognized Environmental Conditions associated with the Site. David J. Powers & Associates understands that no Phase I ESA can wholly eliminate uncertainty regarding the potential for Recognized Environmental Conditions to be present at the Site. This Phase I ESA is intended to reduce, but not eliminate, uncertainty regarding the potential for Recognized Environmental Conditions . David J. Powers & Associates understands that the extent of information obtained is based on the reasonable limits of time and budgetary constraints.

Findings, opinions, conclusions and recommendations presented in this report are based on readily available information, conditions readily observed at the time of the Site visit, and/or information readily identified by the interviews and/or the records review process. Phase I ESAs are inherently limited because findings are developed based on information obtained from a non-intrusive Site evaluation. Cornerstone does not accept liability for deficiencies, errors, or 2 Recognized Environmental Condition means 1) the presence of hazardous substances or petroleum products in, on, or at the subject property due to a release to the environment ; 2) the likely presence of hazardous substances or petroleum products in, on, or at the subject property due to a release or likely release to the environment ; or 3) the presence of hazardous substances or petroleum products in, on, or at the subject property under conditions that pose a material threat of a future release to the environment.
3 A Recognized Environmental Condition that has been addressed to the satisfaction of the applicable regulatory agency with hazardous substances or petroleum products allowed to remain in place subject to the implementation of required controls . 4 A previous release of hazardous substances or petroleum products affecting the Site that has been addressed to the satisfaction of the applicable regulatory agency and meeting unrestricted use criteria established by the applicable regulatory agency without subjecting the Site to any controls .

Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1

Page 15 ends

-
E-22 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EART I-I GROUP
misstatements that have resulted from inaccuracies in the publicly available information or from interviews of persons knowledgeable of Site use. In addition, publicly available information and field observations often cannot affirm the presence of Recognized Environmental Conditions ; there is a possibility that such conditions exist. If a greater degree of confidence is desired, soil, groundwater , soil vapor and/or air samples should be collected by Cornerstone and analyzed by a state-certified laboratory to establish a more reliable assessment of environmental conditions .

Cornerstone acquired an environmental database of selected publicly available information for the general area of the Site. Cornerstone cannot verify the accuracy or completeness of the database report, nor is Cornerstone obligated to identify mistakes or insufficiencies in the information provided (ASTM E1527-21, Section 8.1.3). Due to inadequate address information, the environmental database may have mapped several facilities inaccurately or could not map the facilities . Releases from these facilities, if nearby, could impact the Site.

David J. Powers & Associates may have provided Cornerstone environmental documents prepared by others. David J. Powers & Associates understands that Cornerstone reviewed and relied on the information presented in these reports and cannot be responsible for their accuracy.

This report, an instrument of professional service, was prepared for the sole use of David J.

Powers & Associates and may not be reproduced or distributed without written authorization from Cornerstone . Cornerstone makes no warranty, expressed or implied, except that our services have been performed in accordance with the environmental principles generally accepted at this time and location.

10.1 REPORT VIABILITY
Per ASTM E1527-21 and 40 CFR Part 312, a Phase I Environmental Site Assessment report is presumed to be viable when it is conducted within one year prior to the date of acquisition of the subject property (or, for transactions not involving an acquisition such as a lease or refinance, the date of the intended transaction), provided that the following components of the inquiries were conducted or updated within 180 days prior to the date of purchase or the date of the intended transaction :

Task
Interview with current owner and occupant
Review of standard government environmental record sources Visual observation of the Site and of adjoining properties Declaration by the Environmental Professional
Searches for recorded environmental cleanup liens
Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1
Date Competed
September 21 , 2022
September 19, 2022
September 26, 2022
October 13, 2022
User responsibility

Page 16 ends

Appendix E Phase 1 Environmental Site Assessment E-23
I

WOOOLAIID

ACRES THE

HIGHLANDS
-r .:irler Jne'. s 9 Homrsleatl iilgh School 9
I!!!
Jumpe'°;;;~
llill Ga.te o(Hea~en
T ca1"rnc CEme!E;y z
[§!
\
i
...
:,,
ii;
"
Biaci<!Jerr, farm B
Golf course Y Sf.i,~r.1-.:IJl,d
ft8ldckberry f3rm
T R~eatlon and Poo1
9Moma
oe.p Cliff Gol! cc,urse9
?J

11.fCC/i:'.r.:a.;:
.Ranch-'
Pre><'r«~
/
l "'
,--PP.d

CORNERSTONE

EARTH GROUP
i
!f.

Cruocn Fnness ft
-S1111nr,,ale T
l'/.
£ HIY'1 .... 1111Rd
Norl/'\pOml HOA'
99 Qancn Ma!l<e1 q
C.HOfftNIMtl Ao
BIRDL
NEIOHB
.•pplePa•kQ
'D' --.!UfllPNos fUt,af"'i
z
~
i
~ppleln'in.teLoopQ
z
"'
l
~~ ra,ge1.Q I,
i
M !'lr.11J11.CrN .. Bl¥d Cupertino 9f\.""'Mi1CrNIIS&d
..
[
.Ii
"
YcCJelllll~
... .

V -f
i i ·'"'
1 D-R~lill'l9',lf'•·"~
Tri!d'l:1 Jte's
The Home Depot Q 9
"' !i'
~
Vicinity Map
Paoraor
Cupertino Memorial Park
10185 North Stelling Road and
21251 Stevens Creek Boulevard
Cupterino, CA
~
J
z
if \l~'ICOA""'Y
I
.,
I
i Gupetioof<,gh &.io,! 9
Cr ,tide Pa•
N
~
TT-TEA u~rr
. '<
f
Project Number
118-139-1
Figure Number
Figure 1
Date
October 2022 Drawn By RRN
E-24 Memorial Park Specific Plan
-
> ,, ,,
:0
0 ><
i
~
"' (/)
n > r
"' -:;;
"' "' .::j
0 "' 0
0 I!!

CORNERSTONE

EARTH GROUP
Cupertino Memorial Park
10185 North Stelling Road and
21251 Stevens Creek Boulevard
Cupterino, CA °""
118-139-1
Figure 2
OdnMt10?1 Orii.nD, RRN
Appendix E Phase 1 Environmental Site Assessment E-25
Appendix A - Database Search Report
omitted from published Site Assessment
and Outreach Summary Appendix
Is!

CORNERSTONE

EARTH GROUP

APPENDIX A - DATABASE SEARCH REPORT
-
E-26 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP

APPENDIX B - HISTORIC AERIAL PHOTOGRAPHS AND MAPS
Appendix E Phase 1 Environmental Site Assessment E-27
The EDR Aerial Photo Decade Package
Phase I ESA
21121 Stevens Creek Boulevard
Cupertino, CA 95014
Inquiry Number:

September 19, 2022
7122847.8
6 Armstrong Road, 4th floor
Shelton, CT 06484
Toll Free: 800.352.0050
www.edrnet.com
-
E-28 Memorial Park Specific Plan
2016 1"=500' Flight Year: 2016 USDA/NAIP
2012 1"=500' Flight Year: 2012 USDA/NAIP
2009 1"=500' Flight Year: 2009 USDA/NAIP
2006 1"=500' Flight Year: 2006 USDA/NAIP
1998 1"=500' Flight Date: August 27, 1998 USDA
1991 1"=500' Acquisition Date: January 01, 1991 USGS/DOQQ 1982 1"=500' Flight Date: July 05, 1982 USDA
1974 1"=500' Flight Date: June 26, 1974 USGS
1968 1"=500' Flight Date: June 14, 1968 USGS
1963 1"=500' Flight Date: June 24, 1963 EDR Proprietary Aerial Viewpoint 1956 1"=500' Flight Date: June 09, 1956 USDA
1950 1"=500' Flight Date: April 01, 1950 USDA
1948 1"=500' Acquisition Date: September 26, 1948 USGS/DOQQ 1939 1"=500' Flight Date: August 01, 1939 USDA
EDR Aerial Photo Decade Package 09/19/22
Phase I ESA
Site Name: Client Name:

Cornerstone Earth Group
21121 Stevens Creek Boulevard 1259 Oakmead Parkway
Cupertino, CA 95014 Sunnyvale, CA 94085
EDR Inquiry # 7122847.8 Contact: Stason Foster
Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade.

Search Results:

Year Scale Details Source
When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive.

Disclaimer - Copyright and Trademark Notice
This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY

DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE,

WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property.

Additionally, the information provided in this Report is not to be construed as legal advice.

Copyright 2022 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission.

EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners.
7122847 8- page 2
-
~EDR"
Appendix E Phase 1 Environmental Site Assessment E-29
7122847.8
2016
= 500'
-
YEAR: _____ _
E-30 Memorial Park Specific Plan
7122847.8
2012
= 500'
-
Appendix E Phase 1 Environmental Site Assessment E-31
7122847.8
2009
= 500'
-
E-32 Memorial Park Specific Plan
7122847.8
2006
= 500'
-
Appendix E Phase 1 Environmental Site Assessment E-33
7122847.8
1998
= 500'
-
YEAR: _____ _
E-34 Memorial Park Specific Plan
7122847.8
1991
= 500'
-
Appendix E Phase 1 Environmental Site Assessment E-35
7122847.8
1982
= 500'
-
E-36 Memorial Park Specific Plan
7122847.8
1974
= 500'
-
YEAR: _____ _
Appendix E Phase 1 Environmental Site Assessment E-37
7122847.8
1968
= 500'
..... , ...... . ••••••••••••••• ·-············· ................ •·•••••••••••••••• •••••••••••••••••••• ·::::i:::;::::;::::::::::• =--= ~~. ;:; • :-:·•·::::::::::;::::::;::. ....;;--....:..z=:..:. :.:
£:S :;::=:::~::::!:::~:: -:=:;?, ~:=;:. stl ···:· ·····•·····•·•· _ .... _,_ ... ,, ... :i!! ·::~::::Hf:!!!H::;: --:;--.. ==-·===' i. .. :: -~:·:~::~t~~:!~:~: - .-.:.-:--__.:..:= •• ::::: •:::::::::::: • t~=-= ::::::1. :t::::: ~-~:::_;.:- .. ·····-··· ••••••••••••••••••• ..................... ····· ..
. . ... .. ,.
........... •-·········· ... . ................... , .. . ········••··•••• ••• ................. ····· ...... ._......... . ..... :::::::::::::::::::::::: . ·············-· ..... ................ ................ . .............. - ·: . ...

INQUIRY# : -------
YEAR: _____ _
-
E-38 Memorial Park Specific Plan
7122847.8
1963
= 500'
-
Appendix E Phase 1 Environmental Site Assessment E-39
7122847.8
1956
= 500'
-
YEAR: ---------
E-40 Memorial Park Specific Plan
7122847.8
1950
= 500'
-
Appendix E Phase 1 Environmental Site Assessment E-41
7122847.8
1948
= 500'
-
YEAR: __ _
E-42 Memorial Park Specific Plan
7122847.8
1939
= 500'
-
.... .... ...
....
.. . ....

YEAR: _____ _
Appendix E Phase 1 Environmental Site Assessment E-43
Is!

CORNERSTONE

EARTH GROUP

APPENDIX C - LOCAL STREET DIRECTORY SEARCH RESULTS
-
E-44 Memorial Park Specific Plan
Phase I ESA
21121 Stevens Creek Boulevard
Cupertino, CA 95014
Inquiry Number: 7122847.5
September 22, 2022
The EDR-City Directory Image Report
6 Armstrong Road
Shelton, CT 06484
800.352.0050
www.edrnet.com
Environmental Data Resources IncEnvironmental Data Resources IncEnvironmental Data Resources IncEnvironmental Data Resources Inc -
Appendix E Phase 1 Environmental Site Assessment E-45

TABLE OF CONTENTS

SECT ION
Executive Summary
Findings
City Directory Images
Thank you for your business.

Please contact EDR at 1- 800-352-0050
with any questions or comments.

Disclaimer - Copyright and Trademark Notice
This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING

OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC.

BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER

CAUSE, FOR ANY LOSS OR DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction orforecast of, any environmental risk for any property. Only a P hase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property. Additionally, the information provided in this Report is not to be construed as legal advice.

Copyright 2020 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc. or its affiliates is prohibited without prior written permission.

EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates.

All other trademarks used herein are the property of their respective owners. -
E-46 Memorial Park Specific Plan

EXECUTIVE SUMMARY

DESCRIPTION
Environmental Data Resources, Inc.’s (EDR) City Directory Report is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities.

EDR’s City Directory Report includes a search of available city directory data at 5 year intervals.

RECORD SOURCES
EDR's Digital Archive combines historical directory listings from sources such as Cole Information and Dun & Brad street. These standard sources of property information complement and enhance each other to provide a more comprehensive report.

EDR is licensed to reproduce certain City Directory works by the copyright holders of those works. The purchaser of this EDR City Directory Report may include it in report(s) delivered to a customer. Reproduction of City Directories without permission of the publisher or licensed vendor may be a violation of copyright.

RESEARCH SUMMARY
The following research sources were consulted in the preparation of this report. A check mark indicates where information was identified in the source and provided in this report.

Year Target Street Cross Street Source
2017 þ þ EDR Digital Archive
2014 þ þ EDR Digital Archive
2010 þ þ EDR Digital Archive
2005 þ þ EDR Digital Archive
2000 þ þ EDR Digital Archive
1995 þ þ EDR Digital Archive
1992 þ þ EDR Digital Archive
1985 þ þ Haines Criss-Cross Directory
1981 þ þ Haines Criss-Cross Directory
1976 þ þ Haines Criss-Cross Directory
1971 þ þ Haines Criss-Cross Directory
1968 þ ¨ Polk's City Directory
7122847- 5 Page 1
-
Data by
infoUSA
Copyright©2008
All Riqhts Reserved
Appendix E Phase 1 Environmental Site Assessment E-47

FINDINGS

TARGET PROPERTY STREET
21121 Stevens Creek Boulevard
Cupertino, CA 95014
Year CD Image Source

N STELLING RD
2017 pg A 2 EDR Digital Archive
2014 pg A 5 EDR Digital Archive
2010 pg A 8 EDR Digital Archive
2005 pg A1 1 EDR Digital Archive
2000 pg A1 5 EDR Digital Archive
1995 pg A1 9 EDR Digital Archive
1992 pg A2 2 EDR Digital Archive

STEVENS CREEK BLVD
2017 pg A 3 EDR Digital Archive
2014 pg A 6 EDR Digital Archive
2010 pg A 9 EDR Digital Archive
2005 pg A1 2 EDR Digital Archive
2000 pg A1 6 EDR Digital Archive
1995 pg A2 0 EDR Digital Archive
1992 pg A2 3 EDR Digital Archive
1985 pg A2 6 Haines Criss-Cross Directory
1985 pg A2 7 Haines Criss-Cross Directory
1981 pg A3 0 Haines Criss-Cross Directory
1981 pg A3 1 Haines Criss-Cross Directory
1976 pg A3 3 Haines Criss-Cross Directory
1971 pg A3 5 Haines Criss-Cross Directory
1968 pg A3 6 Polk's City Directory
7122847- 5 Page 2
-
E-48 Memorial Park Specific Plan

FINDINGS

CROSS STREETS
Year CD Image Source

CHRISTENSEN DR
2017 pg. A 1 EDR Digital Archive
2014 pg. A 4 EDR Digital Archive
2010 pg. A 7 EDR Digital Archive
2005 pg. A1 0 EDR Digital Archive
2000 pg. A1 4 EDR Digital Archive
1995 pg. A1 8 EDR Digital Archive
1992 pg. A2 1 EDR Digital Archive
1985 pg. A2 4 Haines Criss-Cross Directory
1981 pg. A2 8 Haines Criss-Cross Directory
1976 - Haines Criss-Cross Directory Street not listed in Source 1971 - Haines Criss-Cross Directory Street not listed in Source 1968 - Polk's City Directory Street not listed in Source

N STELLING RD
1985 pg. A2 5 Haines Criss-Cross Directory
1981 pg. A2 9 Haines Criss-Cross Directory
1976 pg. A3 2 Haines Criss-Cross Directory
1971 pg. A3 4 Haines Criss-Cross Directory
1968 - Polk's City Directory Street not listed in Source 7122847- 5 Page 3
-
Appendix E Phase 1 Environmental Site Assessment E-49
City Directory Images
-
E-50 Memorial Park Specific Plan
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A1
SourceTarget Street Cross Street
2017
21023 BAL, GURJEET S
21033 KOKENY, FELIX J
21053 SOUGOUMARANE, SUGU
21063 PEARLMAN, DALE
21113 KUNG, FENG C
21123 NARAYANAN, RAJESH
21143 CHANG, DAVID M
21153 VIJAYKUMAR, VIJAYABHUVANA
-
Appendix E Phase 1 Environmental Site Assessment E-51
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A2
SourceTarget Street Cross Street
2017
10100 VILLAGE LITTLE PRESCHOOL
10185 CUPERTINO HISTORICAL SOCIETY & MUSEU
10200 TATE, RANJEET S
10218 HE, DAVID Q
10228 WU, TENG
10242 KUMAR, MAHENDRA J
10308 KLOSTERMAN, KELBY J
10322 MERCHIA, AMBIKESWAR R
10336 ESPANOL, RODY F
10352 KINDERLAND CHILD DEVELOPMNT CNTR
10394 GUO, NINGNING

JAMAL, HEMIDAN

LOPEZ, ANTONIO C
10395 ALVES, JAMES
-
E-52 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A3
SourceTarget Street Cross Street
2017
21111 CITY OF CUPERTINO
21250 CALIF COMMUNITY COLLEGES HIGH TECH C

CALIFORNIA HISTORY CENTER

DE ANZA COLLEGE
21251 CITY OF CUPERTINO
21255 SHANE CO

SHANE COMPANY DIRECT DIAMOND IMPORTE
21265 A PLUS TEA HOUSE

COFFEE SOCIETY

CRITTER CARE

GUARDIAN MORTGAGE DOCUMENTS INC

JAMBA JUICE

KARA KARA INC

LUDLOW CREATION LUDLOW LLC

QUICKLY CORP
TOGOS
21267 ORANGE TREE FROZEN YOGURT

SIMPLY THAI RESTAURANT

SITAR INDIAN CUISINE
21269 DANCE ACADEMY USA

ELS EDUCATIONAL CENTERS

FABULOUS NAILS

OAKS CENTER

PREMIER OF CAMPUS TEXTBOOKS

SPRINGS WELLS SPA
21271 190 WEST SAINT JAMES LLC
24 HOUR FITNESS

LEAPSTART AFTER SCHOOL

PHOLICIOUS
21275 09 SLIDERS
BLUELIGHT CINEMAS 5

RETAIL ENTERPRISES LLC
-
Appendix E Phase 1 Environmental Site Assessment E-53
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A4
SourceTarget Street Cross Street
2014
21023 UPPAL, HARMINDER P
21033 KOKENY, FELIX J
21043 BAO, SANDRA
21053 SOUGOUMARANE, SHANMUGANANDAM
21063 PEARLMAN, DALE L
21073 TURNER, ROBERT C
21123 FENG, EUNICE
21133 FERNANDEZ, OSVALDO A
21143 CHANG, C
21153 VIJAYKUMAR, NARAYANAN J
-
E-54 Memorial Park Specific Plan
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A5
SourceTarget Street Cross Street
2014
10100 VILLAGE LITTLE PRESCHOOL
10185 CITY OF CUPERTINO

CUPERTINO HISTORICAL SOCIETY & MUSEU
10200 RANJEET, ISABEL E
10218 HE, DAVID Q
10242 KUMAR, MAHENDRA J
10308 LITVINYUK, YURIY Y
10322 MERCHIA, AMBIKESWAR R
10336 ESPANOL, RODY F
10352 KINDERLAND CHILD DEVELOPMNT CNTR
10394 DELAO, MARCELO
-
Appendix E Phase 1 Environmental Site Assessment E-55
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A6
SourceTarget Street Cross Street
2014
21111 CITY OF CUPERTINO

CUPERTINO SPORTS CENTER
21250 CALIF COMMUNITY COLLEGES HIGH TECH

CALIFORNIA HISTORY CENTER

DE ANZA COLLEGE

FLINT CENTER

UNA MAS MEXICAN GRILL
21251 CITY OF CUPERTINO

CUPERTINO SENIOR CENTER
21255 SHANE CO

SHANE COMPANY DIRECT DIAMOND IMPORTE
21265 COFFEESOCIETY

GUARDIAN MORTGAGE DOCUMENTS INC

JAMBA JUICE

KANG, YUNG H

KARA KARA INC

LEVY, MITCHELL A

MARSEILLES, ED O

QUICKLY CORP

TOGOS OAKS SHOPPING CENTER
21267 HOBEES CALIFORNIA RESTAURANT

ORANGE TREE FROZEN YOGURT CUPERTINO

SITAR INDIAN CUISINE

THAI SQUARE
21269 DANCE ACADEMY USA

ELS EDUCATIONAL CENTERS

FABULOUS NAILS

OAKS CENTER

PREMIER OF CAMPUS TEXTBOOKS

SPRINGS WELLS SPA
21271 24 HOUR FITNESS

LEAPSTART AFTER SCHOOL

PHOLICIOUS
21275 BLUELIGHT CINEMAS 5
-
E-56 Memorial Park Specific Plan
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A7
SourceTarget Street Cross Street
2010
21023 OCCUPANT UNKNOWN,
21033 SCHAKOW, TIMOTHY G
21043 BAO, DAVID H
21053 SOUGOUMARANE, SHANMUGANANDAM
21063 PEARLMAN, DALE L
21073 TURNER, ROBERT C
21113 HSIA, WEI
21123 OCCUPANT UNKNOWN,
21133 FERNANDEZ, OSVALDO A
21143 CHANG, DAVID M
21153 VIJAYKUMAR, NARAYANAN J
-
Appendix E Phase 1 Environmental Site Assessment E-57
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A8
SourceTarget Street Cross Street
2010
10100 ABUNDANT LIFE ASSEMBLY OF GOD

VILLAGE LITTLE PRESCHOOL CTR
10185 CUPERTINO HISTORICAL SOCIETY

CUPERTINO PARKS & RECREATION

QUINLAN COMMUNITY CTR
10200 LIAO, RICHARD G
10218 HE, DAVID Q
10228 LIN, JASON
10242 KUMAR, MAHENDRA J
10256 OCCUPANT UNKNOWN,
10308 LITVINYUK, YURIY Y
10322 LEE, ROBERT H
10336 ESPANOL, RICARDO F
10352 KINDERLAND CHILD DEVMNT CTR
10394 LOPEZ, ANTONIO C

RUIZ, MARIA
-
E-58 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A9
SourceTarget Street Cross Street
2010
21111 CUPERTINO SPORTS CTR

CUPERTINO TEEN CTR

LIFETIME TENNIS
21250 CALIFORNIA COMMUNITY COLLEGES

CALIFORNIA HISTORY CTR

CENTER FOR APPLIED CMPTV TCHNL

DE ANZA COLLEGE

EUPHRAT MUSEUM OF ART

FLINT CENTER

KONICA MINOLTA PLANETARIUM

MEDITERRANEAN CAFE

UNAMAS MEXICAN GRILL
21251 CUPERTINO SENIOR CITIZEN CTR
21255 SHANE CO DIRECT DIAMOND IMPRTR
21265 ANONUEVO, ALEXANDER

COFFEE SOCIETY

CRITTER CARE

GOOD, JAMES L

JAMBA JUICE

KANG, YUNG H

LEVY, MITCHELL A

MARSEILLES ASSOCIATES

MARSEILLES, ED O

MORENO, MARIANA B

QUICKLYS

STUCKEY, STEPHEN R

SUSHI YA RESTAURANT
21267 HOBEES RESTAURANT

ORANGE TREE

SIMPLY THAI RESTAURANT
TOGOS
21269 COLDWELL BANKER

DANCE ACADEMY USA

FARAS HAIR SALON

MALLI HAIR DESIGN

PEAK PHYSICAL THERAPY

PREMIER OFF CAMPUS BOOKSTORE

PREMIER OFF CAMPUS TEXT BOOKS

PRIME CARE

YU, CINDY
21271 24 HOUR FITNESS

PHO LINH
21289 SCHULZ, ROLAND
-
Appendix E Phase 1 Environmental Site Assessment E-59
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A10
SourceTarget Street Cross Street
2005
21023 BAL, RUBINDER R
21033 SCHAKOW, ROBERT A
21043 BAO, DAVID H
21053 HIROYUKI, NISHIO
21063 PEARLMAN, DALE L
21073 TURNER, ROBERT C
21113 WANG, CHIH H
21123 KING, HUEI
21133 FERNANDEZ, OSVALDO A
21143 CHANG, DAVID M
21153 VIJAYKUMAR, NARAYANAN J
-
E-60 Memorial Park Specific Plan
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A11
SourceTarget Street Cross Street
2005
10100 ABUNDANT LIFE ASSEMBLY F GD

VILLAGE LITTLE
10185 CITY OF CUPERTINO PARKS

CUPERTINO HISTORICAL SOCIETY & MUSEU

QUINLAN COMMUNITY CENTER
10200 OCCUPANT UNKNOWN,
10218 HE, QIANSHAN S
10228 WU, TENG
10242 RUIZ, MANUEL F
10256 WALIULLAH, MOHAMMED T
10308 CHEN, LINDA
10322 LEE, BAUMIN
10336 ESPANOL, RODY F
10352 KINDERLAND CHILD DEVELOPMENT CENTER
10375 CHERIAN, RACHANA
10394 DELAO, MARCELO

LI, HONG

OCCUPANT UNKNOWN,
-
Appendix E Phase 1 Environmental Site Assessment E-61
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A12
SourceTarget Street Cross Street
2005
21111 DACA SWIM SCHOOL

LIFE TIME TENNIS INC

THE CUPERTINO TENNIS CLUB

TRENNER JIM TENNIS
21250 CALIFORNIA PLUS ENGINEERING

REFLECTIONS

THE FLINT CENTER
21251 CUPERTINO SENIOR CENTER
21255 SHANE CO

WESTERN STONE & MTL CORP
21263 TOGOS
21265 ADAMS GLOBAL CONSTRUCTION

ANO NUEVO INVESTMENT

BOHANNON, C L

CEONETWORKING PRESS

COFFEESOCIETYCOM

DIANE HILTON

DICK, R K

DOUGLAS, FELICIDAD A

DUNN PRODUCTS CORP

EDBROOKE INTERNATIONAL

ESQ BUSINESS SERVICES INC

ESQ LTD

GOOD, JAMES L

GOODELL, MONICA M

HO KEE JEWELRY

JAMBA JUICE

JUDD, PABLO L

KAHL, BRETT R

LEVY, MITCHELL

LUI, CECILY W

LYNN, AMANDA

MANI PROPERTIES

META MEHLING & ASSOCIATES

MY STATIONERS INC

NIBERT, VALARI J

POSTAL ANNEX PLUS SERVICE

PRAKASH SARMA

PRESTIGIOUS FUNDI

PRESTIGIOUS FUNDING

REYNIA, TIMOTHY J

SCHWEGLER, WILLIAM C

SIDDIQUI, AHMED M

SIERRAS, RUDY

STUCKEY, STEPHEN R

WEBSCOPE

WILLIAMS, ANTOINETTE M
21267 COLD STONE CREAMERY

HOBEES RESTAURANT
21269 AIDAS UNIVERSITY BOOK EXCHANGE INC
-
E-62 Memorial Park Specific Plan
(Cont'd)
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A13
SourceTarget Street Cross Street
2005
21269 BOSSABELLA INC

BRIGGS, GARY S

CELTIC SHOPPE

COLDWELL BANKER RESIDENTIAL REAL EST

DANCE ACADEMY USA

OAKS TRAVEL GALAX SEA CRUISES

PEAK PHYSICAL THERAPY

PHAM, SANH

SCHOOL HOUSE DANCE

SERRATO, JAVIER
21271 24 HOUR FITNESS
24 HOUR FITNESS EXPRESS

KWON, JENNIFER

ROYAL TOFU HO

ROYAL TOFU HOUSE

TSUNAMI SUSHI

WOMENS WRKOUT WEIGHTLOSS CTRS
-
Appendix E Phase 1 Environmental Site Assessment E-63
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A14
SourceTarget Street Cross Street
2000
21033 SCHAKOW, ROBERT A
21043 BAO, DAVID H
21053 NAMBA, KOTARO
21063 PEARLMAN, DALE
21073 TURNER, ROBERT C
21113 WANG, HSIA I
21123 LEAL, MILFORD M
21133 FERNANDEZ, OSVALD A
21153 VIJAYKUMAR, N
-
E-64 Memorial Park Specific Plan
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A15
SourceTarget Street Cross Street
2000
10100 ABUNDANT LIFE ASSEMBLY OF GOD

VILLAGE LITTLE PRESCHOOL AND DAY CARE CENTER
10135 FERNANDEZ, R
10185 CUPERTINO COMMUNITY SERVICES

CUPERTINO HISTORICAL SOCIETY & MUSEUM
10200 OCCUPANT UNKNOWN,
10214 RANCE, GRAHAME
10228 OCCUPANT UNKNOWN,

SUPERSITE
10242 OCCUPANT UNKNOWN,
10256 RAMIREZ, HEBER
10308 OCCUPANT UNKNOWN,
10322 FLORES, EMILIO
10336 ESPANOL, P
10351 OCCUPANT UNKNOWN,
10352 KINDERLAND CHILD DEVELOPMNT CNTR
10395 ALVES, ANTHONY D
-
Appendix E Phase 1 Environmental Site Assessment E-65
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A16
SourceTarget Street Cross Street
2000
21111 ACCELARATION CUPERTINO NOVA CARE SPORTS PERFORMANCE & PHYSI

CUPERTINO CITY OF RECREATION CITY OF CUPERTINO

DACA SWIM SCHOOL
21250 CALIF COMMUNITY COLLEGES HIGH TECHNOLOGY CENTER TRAINING UNI

CALIFORNIA HISTORY CENTER

DEANZA COLLEGE

DEANZA COLLEGE FAX

FLINT CENTER ADMINISTRATIVE OFFICES

NATURAL EDGE JUICE BAR
21251 CUPERTINO CITY OF RECREATION CITY OF CUPERTINO
21255 SHANE COMPANY DIRECT DIAMOND IMPORTERS
21265 ASULIN, SHIMON O

BARAJAS, TONY

DRUCKER, URI L

ENLOW, ANGELA D

GONZALEZ, J

GORREPATI, KRISHNA

JAMBA JUICE

KIM, HOIL

LEIGLAND, RYAN J

LOHSE, DOLORES F

MIR, SHAFIA Z

MORROW, DON T

OHAYON, SIMON
POSTAL ANNEX 189

RACIMO, DANIEL

ROSEN, G W

SHAHNA, MEILI

SHARIF, HAMEED
21267 HOBEES RESTAURANT DEANZA

METROSPORT

MOMS ICE CREAMERY & GRILL
21269 AMERICAN SPIRIT ASSOCIATION INCORPORATED

AMERICAN TITLE INSURANCE COMPANY

BERGMAN DAVID

CAFE QUINN

CELTIC SHOPPE
CENTURY 21 CONTEMPO REALTY

COLLECTION THE

CONTEMPO REALTY INCORPORATED

FABULOUS NAILS

FLOR FRANKIE CMT

IDAS GEMS & DESIGNS

MARK BURNS REALTOR

OAKS CENTER ASTORIA CLEANERS

OAKS CENTER CELTIC SHOPPE

OAKS CENTER FABULOUS NAIL

OAKS CENTER HOBEES RESTAURANT DEANZA

OAKS CENTER OAKS HAIR SALON

OAKS CENTER OAKS TRAVEL
-
E-66 Memorial Park Specific Plan
(Cont'd)
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A17
SourceTarget Street Cross Street
2000
21269 UHRI CHERYL L DC
21271 LINDA EVANS FITNESS CENTER
21275 OAKS THEATRE
-
Appendix E Phase 1 Environmental Site Assessment E-67
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A18
SourceTarget Street Cross Street
1995
21023 UPPAL, R K
21033 SCHAKOW, ROBERT A
21043 BAO, DAVID H
21053 NAPIER, NANCY
21063 OCCUPANT UNKNOWNN
21073 TURNER, ROBERT C
21113 HSIA, TOM W
21123 LEAL, MILFORD A
21133 FERNANDEZ, OSWALD
21143 C P TECHNOLOGY INC
-
E-68 Memorial Park Specific Plan
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A19
SourceTarget Street Cross Street
1995
10100 DE ANZA BIBLE CHURCH

VILLAGE LITTLE

WENDSCHLAG, GREG
10185 CUPERTINO COMMUNITY SVC

CUPERTINO HISTORIAL MUSEUM

CUPERTINO RECREATION DEPT

SALVATION ARMY
10228 CHANG LABORATORIES INC
10308 SINGH, GURDEEP
10322 OCCUPANT UNKNOWNN
10336 ESPANOL, P
10352 PARTY AMERICA
10380 AZIZEH MOHAJER

BRANDY HULL HAIR STYLIST

HAIR DESIGNS BY SHARON

LAURA RENEE

MODERN REFLECTIONS

NAILS BY PATTI

RENEE, L

ROBIN MOSHER
10395 ALVES, ANTHONY D
-
Appendix E Phase 1 Environmental Site Assessment E-69
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A20
SourceTarget Street Cross Street
1995
21111 CUPERTINO SPORTS CTR

CUPERTINO SPORTS CTR & PRO SHP
21250 CALIFORNIA HISTORY CTR

DE ANZA COLLEGE

F W SPENCER & SON INC
21251 CUPERTINO SENIOR CITIZEN CTR
21255 PACIFIC BREEZE
21265 CITY NIGHTS

COFFEE SOCIETY

HENDRIKAS LARGE SIZE FASHION
21267 FLEET FEET

HOBEES RESTAURANT DE ANZA

MOMS ICE CREAMERY & GRILL

SWEET ENDINGS

SWEET ENDINGS BONNE PATISSERIE
21269 A CLEAN WELL LIGHTED PLACE

ASTORIA CLEANERS

CAFE QUINN

CELTIC SHOPPE

COMPUTER GENERATION

FABULOUS NAILS

OAKS HAIR SALON

PERSPECTIVE PUBLISHING INC

RUNNING THREAD

U S TRAVEL

UHRI, CHERYL
21271 BLUE CHIP COOKIES

LOTUS INN

SOPHIAS FASHIONS

VOGUE ALLEY
21275 OAKS THEATRE
-
E-70 Memorial Park Specific Plan
-

CHRISTENSEN DR
EDR Digital Archive
7122847.5 Page: A21
SourceTarget Street Cross Street
1992
21023 LODES, TOM
21033 SCHAKOW, ROBERT A
21043 BAO, DAVID H
21063 PEARLMAN, DALE
21123 LEAL, MILFORD A
21133 FERNANDEZ, OSWALD
21143 C P TECHNOLOGY INC
-
Appendix E Phase 1 Environmental Site Assessment E-71
-

N STELLING RD
EDR Digital Archive
7122847.5 Page: A22
SourceTarget Street Cross Street
1992
10100 DE ANZA BIBLE CH

VILLAGE LTTL PRESCH
10185 CUPERTNO CMNTY SERV

ROBERT W QUINLAN CT
10200 LITTMANN, VINCENT P II
10308 SINGH, GURDEEP
10322 ZHU, QING L
10336 ESPANOL, P
10351 ELRASHIDI, M
10352 PAPER FACTORY OUTLT
10380 HULL B HAIR STYLIST

SPENCER VICKY HAIR
-
E-72 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
EDR Digital Archive
7122847.5 Page: A23
SourceTarget Street Cross Street
1992
21111 CUPERTNO SPORTS CTR
21250 C E S D A C

CA COMMUNITY CLGS

CA HISTORY CENTER

DE ANZA CLG ACTIVTY
21251 CUPERTNO SR CMTY CT
21255 PAC FRESH
21265 CITY NIGHTS

HENDRIKAS FASHION

VOGUE ALLEY
21267 BRITISH MARKET

FLEET FEET SPORTS

FOR SOMEONE SPECIAL

G K W H INC

HOBEES REST DE ANZA

MOMS ICE CREAMERY

RUNNING THREAD THE

SWEET ENDINGS
21269 ASTORIA CLEANERS

BAGEL WORKS THE

BONNE, P
C G 2

CAFE QUINN

CELTIC SHOPPE

COMPUTER GENERATION

FABULOUS NAILS

OAKS CENTER
21271 BLUE CHIP COOKIES

CLEAN WELL LIGHTED

LOTUS INN

RACQUET SPORTS LTD

SHIZEN NUTRITN STR

SOPHIAS FASHIONS
21275 OAKS THEATRE

SENOR PEPES
-
Appendix E Phase 1 Environmental Site Assessment E-73
-

CHRISTENSEN DR
Haines Criss-Cross Directory
7122847.5 Page: A24
SourceTarget Street Cross Street
1985
-
CHRISTENS .EN 0R 95014 ·

CUPERTINO '
2102-3 LODES ro:M 255-5948 +5
21033 SCHAKOW R ~ 725--0245 0
210~3 BAO DAVID H 725-8135 0
21053 BRADING GENE 257-7493
BRADI.NG HANNELORE 257-7493 0
21063 PEARLMAN DALE 996-1459 ...

PEARLMAN DARA 996-1459
21113 MATTINGLY RANDY. ·257-8741 2
21123 LEAL M~LFOR0 A ◄ •6·0381 0
21133 FERNANDEZ ELVA 725-0-585 0
1,
FE~NAN0EZ OSWAt0 725-0585
21,4.3 C P TECHNOLOGY INC i91-8069 " + 5
211S3 WIL·SON ~OBEA.T E 257-7331 2
... 1 a.us 12 fiES 2 NEW
E-74 Memorial Park Specific Plan
-

N STELLING RD
Haines Criss-Cross Directory
7122847.5 Page: A25
SourceTarget Street Cross Street
1985
-
STELLING RD N 95014

CUPERTINO
10100 COUCHMAN LEONARD 255-0441 1
DEANZA BIBLE CHURCH 252-2668 • VILLAGE Lm PAESCH 252-20SO 8 10111 xxxx 00
10200 xxxx 00
1021• GREEN RONALD A 253-3906 9
10228 xxxx 00
10242 xxxx 00
10256 WOLFGRAM TRINA 252-5143 1
10271 xxxx 00
10308 xxxx 00
10322 CAVIN C STEVEN 257-3541 +S
10333 xxxx 00
10336 ESPANOL PRUDENCIO 253-1493
10351 xxxx 00
10352 xxxx 00
10360 xxxx 00
10380 HEADSHAPES 996-0397 2
LUSSIER DAVID 996-0387 +5
10394 xxxx 00
Appendix E Phase 1 Environmental Site Assessment E-75
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A26
SourceTarget Street Cross Street
1985
21000 OEANZA MOBIL 2S7-1S16
DUNZA M081l. SERV 2S7-1S91 7
21080 xxxx 00
211 11 OEANZA RACQUET CLUB 25S-OSS 1
OUNZA RACOUET CLUB 257-~67 0
211 21 xxxx 00
211 S1 XXXX 00
21 250 BUILDING
C E S 0 A C 252- 8050 I
OEANZA CLG H8-4760
OUNZA CLG ACTIVITY 98&-47S8
DEANZA CLG ACTIYfTY 9915-4602 I
DEANZA CLG ACTIVITY 986-47S6 I
DEANZA CLG ADAPTIVE 996-4873 4
DEANZA CLG AOMISSHS 998-4 720 1
DUNZA CLG ADULT ED 748-2752 3
DUNZA CL.G ADULT SV 998-4884 3
DEANZA ClG AHNCMNT 9915-4502
OEANZA CLG ASC STD 998--4895 4
OEANZA CLG ATHLETIC 99&-4751
DEANZA CLG BLGCL SC 998-4773
DUNZA CLG BOOKSTOR 996-4701
OEANZA CLG BOOKSTRE 9915-4701 I
DUNZA CLG 8SNS SYS H8-47915
DEANZA CLG BUS tNO H0-4110 4
DUNZA CLG BUSICMPT 990-4790
OEANZA CLG BUSINES-C. 998-4710
OUNZA CLG CA HIST HfS-4712
OEANZA CLG CA HSTRY iH-4712 1
DUNZA CLG CAREER 9915-4~ 1
DEANZA CLG CHLO DEV Hl5-4822
OUNZA CLG CMNTY SY 9911-41574
OUHZA CLG COM SV 9"-41574 1
OUNZA CLG COOP ED HfS-4~ 1
DUNZA CLG COUNSLNG 998-4649
OUNZA CLG COURSES 998-4989
OUNZA CLG OEVLP 998-4822 1
OEANZA CLG DtAG CL 9915-4838
OUNZA CLG OtAGHSTC 998-4838
DEANZA CLG EMPLY 9915-4M1
OUNZA CLG ENG nCH 9915-4772
OUNZA CLG ENGRG H&-4172
OEANZA CLG ENYAMNTl Hl5-4525
OUHZA CLG ENVRNMNT 99&-4525 1
OUNZA CLG F1NE ART 998-4832 1
DEANZA CLG FLEA MKT 99&-4940 1
OUNZA CLG FLINT CT HfJ-4818 1
DEANZA CLG FLINT CT 998-4820 1
OEANZA CLG FNCL AIO 998-4718 1
DUNZA CLG FOOD SY 99&-4515 2
OUNZA CLG GALLERY ff&-4839 4
OUNZA CLG HLTH SAY 998-4732 I
OUNZA CLG tNOEP 990-4989 I
OEANZA CLG INFO 990-,0eo 1
OEANZA CLG 1NPO CT 998-4790
DEANZA CLG IHnRN 9H-4M1
OEANZA CLG INnRNSP 99&-'M 1
DEANZA CLG1NTACLTA 996-4709
HAINES & CO. INC INFORMATION ON TiilS PAGE Ml
-
E-76 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A27
SourceTarget Street Cross Street
1985
-
-STEVENS CRK 8LVO 9501' CONT
21250
21251
21255
21265
21267
21269
21269
21211
21215
DEANZA ClQ JUSTICE 119&-0Sl 1
DfANZA ClO LANOUAGE ll99·4S47
DEANZA CLO LAVOZ 1198-4785
DEANZA CLO LAVOZ 998-4761
DEANZA CLO L181URY IIII0-4761
DEANZA CLG Ill TCL TRL 1190-4828 1
DEANZA CLO Ill TICL Tll IIII0-41128
DfANZA ClG HUR$1NO 11911-4175
DEANZA CLO OCCUPTNL 998-0611 I
DEANZA CLO PHYS ED 1196-4751
DEANZA CLG PffTS £0 11116-4673
OEANZA CLG PHYS LTO 11119- ◄ TSJ
OEANZA CLG PHYS SC 11116•4 77'
DEANZA ClG PHYS(LLT 1196-4927
DEANZA CLO PMYSCLLT 119t-47SJ 1
OEANZA ClG PUNITRIII 11119-4814
DUNZA CLO P!.NTIIII 1191-4614
DUNZA CLO POOL 119&-47110
OEANZA CLO POOL INF 1199-41IIO
DEANZA CLO PRINT SY 1199.4191
DUNZA CLO PRNTG SV 1199-4981
DEANZA CLG RENEW 1199-47)7 1
DEANU CLG RESOURCE 1199-4841
DUNU CLO SCIIIIATH 1199-4774
DEA NZA CLG SCIENCE 1199•'773
OUHZA CLO SECURITY 11119-4148 1
DEANZA CLG SOC SCI ff9•4770
DUNZA CLG SOCL SC 1198-4770
DUNZA CLG STAFF 1199•411311 •
OUNZA CLG STO EIIIPL 1199•U41
DEAHZA ClG STOY :RS IIH-•11911 I
DEAHZA ClG STf DYLP 1199•'748
DEANZA CLG STVOT tlle-411I2 1
DUNZA CLO T V CRS 1196-49811
DUNZA CLO TEST OFC 11119-4761
DEANZA CLG TtsT OFC i,98-4711
DEANZA CLG TESTING 11119-4111
DEAHZA CLG TEXTBKS 11119-4455
OEAHZA CLG TVTOR CT 11911-4&112 1
DUHZA CLG TVTORlAL 9116-4882
DEAHZA CLG TV CNTII IIH-4196 4
DEANZA CLO VAN OSPT 11118-41121
DEAHZA CI.G VET AFfR 1196-45115
OEANZA CLG VETS AfF 11116-45115 1
DEANZA COLLEGE 11118•111155•5
FLINT CENTER eox CT 257-1555
CUPERTllO SENIOR 253-2098
CUPRTNO CTT SR CNTII 2SJ-2098
SANO PIPER 2S5-8060
01ns UNIOVE 11119-1122 9
VOGUE ALLEY 2S3-11680•5
AUIIO CIIIPTII CENTER 252-3830 ♦S
AUIIO EL TRHC CIIPHTS 252·3830 +5
FEA THEA YOUR NEST 1196•11230 •
UTARANTELU 257-5945 I
OPTICALLY SPEAKING 251·51115 0
IIUHNING THREAO THE 2S7•2720 3
SWEET COIIIPANT 1173•0922 3
SWEHSENSICECREAII 25~1811 7
.~~i~'~cORKS Tl4E u6-2m I
BIIASS NAl. SHOE RPR 252-7742 l
CfL TIC SHOPl'E 252·3048 •S
COUNTIIY HOIIE 725-0901 +&
N Y K 1NT£RIO!l 1111P 257-~34 •S
HfR&Allfl DISTI 445-0100•5
HYCENA ORY CLEANING 2SJ•UU 3
IIIDNIGHT SUN 448-0100 4
OAKS CENTER 15.3-1440 2
OAKS HAIR SALON 255-MOD +S
OAKS HYGENA ORY CLO 2S3•444' 3
OAKS TIIAVEL 2SJ-8200 7
SHIRE THE 11118-8787 9
UVA TAN 446-0100 (
VIP PRINTING 1173-1811 (
A CLEAN WELL LIGHTO 25~ 7100 6
BLUE CHIP COOlllES 257-1849 ♦ 5
CLEAN PLACE FOR BK$ 255-7600 6
LOTVS INN 8116-8886 4
RAC OU ET SPORTS L TO 255-eseo 9
SHIZEN NUTll!Tll S1'11 255-3068 0
SOPHIAS FASHIONS 448-31100 8
ACORN fLOIISTSUCCNT 255-0380 8
OAKS THEATRE 448-1134
PEPES SENOR ue-1000 9
SENOR PEPES 4'8- 1 000 8
Appendix E Phase 1 Environmental Site Assessment E-77
-

CHRISTENSEN DR
Haines Criss-Cross Directory
7122847.5 Page: A28
SourceTarget Street Cross Street
1981
-
'•--
CHRISTENSEN DR 95014

CUPERTINO
21023 SPELIOPOULOS NICK 446-0821 0
21033 SCHAKOW RA 725-0245 0
210,.3 BAO OAVfD H 725-813$ 0
21053 BRADING GENE 257•7493 0
21063 KIM E0WARD Y 725.--0-464 0
21113 xxxx 00
21123 LEAL MILFOR0 A 446-0381 0
21133 FERNANOEZ OSWALD 725-0585 0
21153 TYSON BENNETT J 725--0455 0
• 0 BUS 9 RES 0 NEW
E-78 Memorial Park Specific Plan
-

N STELLING RD
Haines Criss-Cross Directory
7122847.5 Page: A29
SourceTarget Street Cross Street
1981
-
STELLING RD N 95014
CUPEFiTINO
10100 COUCHMAN LEONARD 255-04~ 1 + 1
DEANZA BIBLE CHURCH 252-2050 7
VILLAGE L TTL PRESCH 252-2050 8
10111 xxxx 00
10200 xxxx oo
1021 _. GREEN RONALD A 253-3906 9
10228 DAVIS ROY F 255-8•32 6
10242 SAPIE~ ELISA 257-5528 9
10256 WOLFGRAM TRINA 252-5 14'3 + 1
10271 xxxx 00
1030P xxxx 00
10322 UUL TITECH ELEC INC 252-•212 + 1
10333 xxxx 00
10336 ESPANOL PRUDENCIO 253-1493
1035t STARR NM 252~5309
10352 OEA"4ZA LOUNGE 25s-,22, 6
10360 STELLING RO BARBER 255-0874 0
10360 HOUSE OF HAIR (46-2005 0
STELLING HS OF HAIR (46-2005 7
10394 GUDENKEUF RICHARD 255-7828 + 1
PLANT CRAFTER THE 996-0605 6
-
Appendix E Phase 1 Environmental Site Assessment E-79
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A30
SourceTarget Street Cross Street
1981
ll I I
2, 2
' s 1 ac
11161
~UNlA ftACOUEf Cl.VI H~ ,sss • 1
CtEUU> R.1.COIJET CI.UU t$7•S.C67
llll 00
tuPEtn•O ClY SR CT2 Hl-lOIII
a: .. ~
CfSO•C IS1•80SO•I
0Ulrt1A CLG &CTl\tiTY 996••.UIOf • t
OElM>A cu; AOWSSHS 098-4710 •I
O[AMIA ClG ASC SlOT 9'l"-461S •I
O(Ak!A C.G ASC STI)T IS!·BO~ • I
OUMI& ClC &111.ETIC l!Ql-4151 • I
DUNZA CI.C liLINCiJL 738 t611 1
O.E.AHZA ClC 8 OLOGCl llf>...'77l •'
O~O(;!A, ClC 800k$TR 9"-4101-1
00N2A CLCi 81.iSAl)Ara °"'fi .. ,e 7ii • I
DfAti.ilA CLC. Ca "Sflll' ~6-"' 2 • t
OU1otl.A CLG CARf[R OUS-,081 • I
Of'ANZA ClC t•Rf£A 09~ .. ,~~2 • 1
Dri\NU CLC C&AE:!R H&-•~l•1
OEANZ& CLC CN!W 1tl H~-,084 •
OHNZ.1 Cf.C C"4.C O'il 88£i-41:U • 1
or.1J,ilJ,CLCCllJwTYS¥ ae&--,674•1
DfAlriiZA CIC CW!"!. ACT 89&-,11756•1
OEANZ&C CiC1tSlAFT ii6•4f.iA,8.,
DE.l"'U. CLG C"'6SL CTA H&- OlO • I
DEANl& CLC COPY COR 916--4~0.J • 1
OUNZA CI.G CO\INSL._C 986 4.b4'1 • I
DUHU ClC CAS r, UH-ObU • I
DEIN.U C C (0 OCiltST H~ ~a.u • 1
DEAN2& Cl.C 1:,-.c:. T((H &;6· ◄ 7'1 • I
DE,OUJI CLG EHVRfrlMn et6-4SH • I
DE.1NU CLC. [Y£ HE 2S~-)3J) • t
ou~z., Cl C. F Hf AAT HIS-0,31 • I
ou~u CLC ,.tA .,!( ... ffl••9•&•1
DE.UtlA (LO FL NT IO&• '820 • I
DF&N11 ClG FLINT H6••&16•1
Ofl.lrifU ClC FNCJ,. AID H&-Ot!•t
DUH?A ClG ,OOl) $RV h6•016 • 1
OUN!A tu; NfALTH !H•OJJ • !
ou,za CLC •OP! 198 4673 •
0[.lNlA CLG ~D VIOL 9'U 4!i1 • I
OElHZA at N0Pt~ 'i91-•9bV• 1
Ot:.A'1ZA CLV "CFO tN-C1f,O • 1
OOhU C C 1 .. -.:0 Q-06•067 • I
·,upr.z,t, C Ci lilS P'SCL vt~-'7". I
ou.,,.z.• CLC •!TltC'Lff tt6•06i•I
CIE•NU CLG JUSTIC[ to4••Ul • I
DU11rrtZA CLC l.lN~UJ.Gf att.-•s..tl • I
OEliN?l CtC uvoz 801.• nu• I
cr .. z• ClG lt••· Cl &al-•Uo • I
OU•ZI ClG LC&R• CT 9'16 .,., •I
0£A'-ZA cu; uro ASST 996-07!:i•I
DUfrtZA CLGl,IL.TICLTR 8'96•4821•1
Ol-""llA LC "t,.,"Sla.C IIS6-•4111 •
OtANlJ. CLCi fri\.ift!»O~<i M\ , 11~ • I
DEAMlA cu:; OLD AOLT 996-4871 I
Df.&tdA CLC PHYS EO M•-47SI • I
OEAH,tA C.LG JIJlfY$ ,c;w "6-4Q-27 • I
OUfrl:U CLC PMYS •cw H~•~ Sl.

Of,lhJ;,t. (LC Pflff$ fkP 81~~• 71! •
DUHll Cl C PLAHT1Uit M~-•fll 4 • I
DhHlA CLf, PLCW~l 196••44• • I
DfAH?A ClG POOl 11,,r 99'•0&1 • 1
Or&llfU C tl(GS''lUR 996-,no 1
DU"'ZA cu; A("""' aiS.•7H
or•NZA CLG R:•r U'6-•7H • I
or ANZA cu; $[C\JAn ff6-4 •e •,
DE&•Z• CLC SOCL SCH 896 < no
D£,l1r,jlJ, Cl,(; STtl [WP W6•0,H • I
D(llitZA cic S1D'f S«L "i-491,l •'
OEANZA cu; $T ► F 01ft 09g .. 4e,t •
ou~z• CL(, T[STIN'O O-OG-416J • 1
l)[,11111?• C C T(STH,C "6-•J t 7 • I
DEA Jill A, LG l()IIUL "'•4M1 • I
DfllNZA ClC VEftllA1r,jS aa6-4St'!I • 1
DHNZA (L(; VOl lOiG N6-•8c2 •1
or srr THE UG•I 1Sl•llll • t
,. ,. cr,1• 801 Of'C 211-USIS
.... OJ
S&hOPIPEf' 25!. t,060
,,ns UH'()U£ "' 71 Z2 •
Sm>OOU ffl-JO!O
•O~D!IOF *'LO I'! •U-94~•1
o••P!.-S HOIIE Fttti!SHC 25,J-023(1 • I
lJ.T&IUifilflU 151 .. Y:•~ • I

0.US TMl HA!tNG Of'C 1~-l•UO 7
OPllC'uU SP(tMIHG u1.~;,~
'"'£-S.•r•s Ill lOCI I
$W[NSl'1SIC[ C -.u 2i$•1811
B O•C
a-.Tl'l WOR"LO
OHi DEWAQCO
JU'Sl llf CASE
UT'MtS • 0 J'ilRUtt
I jffi[ 0£0"-F
IIIE'W llilPRfUIONS
O&ICS •JUVEL
R'1 .. h ~G TW=oo n.E
!it-AE I t
'lS-1 ·~-· .,,-1111 a
255-!.9l'l•I
441-4-373•1
1ss..•&00
1SI-SAOO
1Sl·B200
H7•1710 I
9'16•1'~1
-
E-80 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A31
SourceTarget Street Cross Street
1981
-
STEVENS C K BL \ID 9501, CONT
YT LtWrTID 257-6195 +1
21269
21271 A CLEAN PtC FR 800t( 2ss .. 1eoo 6
CLEAN WL UGMTO PlC 255-7600 6
POTATO PATCH THE 255--0700 8
RACOOET SPOfn'S LTO 255-6880 9
SHIZ'EN NUTR'ITH sn 255-3066 0
SOPHIAS FASNIONS U6-JQOO 13
21275 ACORN F L0A1STS 255-0360 8
OAKS THE.&mf •46-113• 5
PE F'E S SE NOR M6-1000 8
SEN~ PEPS (46-1000 8
Appendix E Phase 1 Environmental Site Assessment E-81
-

N STELLING RD
Haines Criss-Cross Directory
7122847.5 Page: A32
SourceTarget Street Cross Street
1976
-
STELL I NG RD N 95014 CUPE RT HJO
l0100•ASSEM8LY GOO CPRTN0252-2050
•SUNNYMONT CHRSTN SC252-2053 5
10111 xxxx 00
10214 xxxx 00
10228 OAVIS ROY F 255-8432+6
10242 LOFTY BRIAN 446-4072+6
10256 WALSH G G 252-0490 3
10271 xxxx 00
1030B WHITE LA 996-7805 5
10322 JACOB OONALD L 255-1B33 5
10333 xxxx 00
10336 ESPANOL PRUOENCIO 253-1493
10351 STARR TT 252-5309
10352*0EANZA LOUNGE 255-4224+6
10360 xxxx 00
10380*ALMA&CINOY HSE HAIR446-2005 5
SLOCUM EUGENIA 255-7616+6
10394*PLANT CRAFTER THE 996-0605+6
E-82 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A33
SourceTarget Street Cross Street
1976
-
- - - -- . Zllll*OEANZA RACQUET CLU8255-4555+6
2112l•CUPERTNO CTY SR CTZ253-2098 5
21250•8AY AREA COLLEGE TV446-2121 5
•OEANZA CLG 800KSTRE257-5122 3
•OEANZA CLG HSTRY CT446-1007 5
•OEANZA CLG STUOENTS255-9544 3
•OEANZA COLLEGE 257-5550 3
•FLINT CENTR BOX OFC257-9555 3
21255•SANOPIPER 255-6060 5
21269*CASUAL AIRE 257-6195+6
•OALE JOHNSON TRAVEL255-5100+6
•JOHNSON O TRAVEL SV255-5100+6
•RACQUET SPORTS LTO 255-6880+6
2127l•A CLEAN PLACE 800KS255-7600+6
•CLEAN WL LIGHTO PLC255-7600+6
21275•0AKS THEATRE 446-1134 5
•STONESON OVLP CORP 253-1440+6
Appendix E Phase 1 Environmental Site Assessment E-83
-

N STELLING RD
Haines Criss-Cross Directory
7122847.5 Page: A34
SourceTarget Street Cross Street
1971
STELLING RD N 95014 CUPERTINO
10l00•ASSEM8LY GOO CPRTN0252-2050
•ASSEMBLY OF GOO 255-04~1+1
10111 SAlCH ROBT J 252-Q~30+1
10214 PETE G L JR 253-~741
10228 CROW LAWRENCE E 252-0290+1
102~2 xxxx 00
10256 GRAINGER JACK T 257-647Q+l
1027l•CHURCH JESUS CHRJST252-633b
•CHURCH JESUS CHRIST252-7477
•CHURCH JESUS CHRIST252-9723
10322 COOPER HENRY W 25J-~3q5+l
10333 XXXX DD
~0336 ESPANOL PRUDENCIO 253-1493
~0351 STARR TT 252-SJ0Q
10352•FRIEN0LY FOX 225-088q+l
•FRIENDLY FOX THE 252-Q63q+l
•GARDEN GATE 8R8R SH257-5270
10380 REY RAMON 252-716q+l
103q4 FARGO R 755-3357+1
-
E-84 Memorial Park Specific Plan
-

STEVENS CREEK BLVD
Haines Criss-Cross Directory
7122847.5 Page: A35
SourceTarget Street Cross Street
1971
-
STEVENS CRK BLVD 95128 SAN JOSE
2200*MARCHICK HERBERT H 286-6565
•MIOAS MUFFLER SHOPS294-74DO+l
22Il•STANOARO OIL CO CAL295-9695+1
2221 •••• AUTO CENTER WEST
•EAST BAY GLASS 287-4400
•EXECUTIVE AUTO SOOY287-5855
•KAY SEAT COVERS 293-5191
•KEELEY JOE AUTO SLS2q2-6351
•LARRY5 AUTO WAXING 2q3-9914
*LITTLE MAN MFFLRt8R294-1402
•LITTLE MAN RACE PRT294-9782
•SERVICE RENT A CAR 292-4441
•SOUTH BAY GLASS 287-4400
•TIRE OUTLET STORES 297-7667
•TRANSMISSION SV CTR298-3350
•WALKER LARRY 2q3-9914
2233*COURT BARBER STYLNG293-5bl7
•ROFFLER CALIF INC 287-5436+1
2257•MIRACLE MILE CAR wszq7-zq3q
2265•WINOWARO SAILBOATS 289-8126+1
2281•CAR PROBE 2q7-7200
*CENTRAL TIRE SERVCE294-4245
•FRANKS SERVICE CNTR297-7200+1
Appendix E Phase 1 Environmental Site Assessment E-85
-

STEVENS CREEK BLVD
Polk's City Directory
7122847.5 Page: A36
SourceTarget Street Cross Street
1968
21050 DE ANZA COLLEGE 257-5550
21340 LAWRENCE L 252-1366
21519 HENARD & CO REAL EST
253-2881

MONTA VISTA SHOE REPAIR
-
E-86 Memorial Park Specific Plan
-
Is!

CORNERSTONE

EARTI-I GROUP

APPENDIX D - QUESTIONNAIRE
Appendix E Phase 1 Environmental Site Assessment E-87

User Questionnaire Page 1
Environmental Questionnaire
(User Questionnaire)

The ASTM Standard E1527-21 defines the User as the party seeking to use a Phase I Environmental Site Assessment to evaluate the presence of Recognized Environmental Conditions associated with a property. Per the ASTM Standard, the User should provide certain information to the environmental professional. Please provide the following information. Responses should be provided in good faith and to the extent of your knowledge. Enter “unknown” if the requested information is not known.

PROJECT DETAILS

1) Describe the reason for performing the requested Phase I ESA. For example, property acquisition/lender requirement, evaluation of business environmental risks, seeking to qualify for Landowner Liability Protections under CERCLA, etc.

2) Please describe your intended use of the property. For example, commercial office space, residential, mixed-use, etc. If the property is planned to be redeveloped, briefly describe the development plans.

3) Will the development plans include excavation and off-site soil removal or the import of soil? If yes, please briefly describe. Yes No

SITE DETAILS

4) Please list all current and former addresses, along with each assessor’s parcel number (APN). Some sites have multiple addresses; all are needed, even if they are not in current use.

Address(es) APN Number(s) Lot Size (acres)

5) Please provide/attach a site plan that accurately shows the property boundaries.

6) Please list current site tenant(s), site use, and years of occupancy:

Years of Occupancy
Tenant Site Use
(e.g., From 1995 to 2007)

7) Please list prior site tenant(s), site use, and years of occupancy:

Years of Occupancy
Tenant Site Use
(e.g., From 1975 to 1983)

Quinlan Community Center Park Recreations offices unkown Senior Center Senior Center offices unkown
Evaluation of environmental risks for Public Park and Public Facility improvements.

Public Park and Open Space, Public Facilities, Transportation 10185 N Stelling Rd. Cupertino, CA 95014 / 326 54 041 / 7.2 acres 21251 Stevens Creek Blvd. Cupertino, CA 95014 / 326 29 006 / 14.5 acres N/A / 326 27 033 / 0.4 acres
Unknown
Ii!

CORNERSTONE

EARTH GROUP
□
-
□
E-88 Memorial Park Specific Plan
User Questionnaire Page 2
8) Please indicate if you are aware of any of the following features currently or formerly at the site.

Structure/Feature Select All
Yes No
Do Not
Know
Aboveground Storage Tanks
Agricultural Wells
Air Emission Control Systems
Boilers
Burning Areas (waste burn pits or ash disposal areas)
Chemical Mixing Areas
Chemical Storage Areas
Drainage Ditches
Drums, Totes, and Intermediate Bulk Containers
Elevators
Emergency Generators
Equipment Maintenance Areas
Fill Placement (i.e., fill used to build up the site elevations) Groundwater Monitoring Wells
Hoods and Ducting (associated with chemical use)
Hydraulic Vehicle or Equipment Lifts
Incinerators
Petroleum Pipelines or Wells
Pits, Ponds, or Lagoons.

Railroad Lines
Row Crops or Orchards
Septic Systems or Cesspools
Solid Waste Disposal Areas (other than municipal trash containers) Stained Soil or Pavement
Stains or Corrosion on Floors, Walls, or Ceilings
Standing Surface Water or Pools
Stockpiles of Soil or Debris
Stressed Vegetation (unrelated to the lack of water)
Strong, Pungent, or Noxious Odors
Sumps, Clarifiers, Oil-Water Separators, or similar structures Transformers
Underground Storage Tanks
Unidentified Substance Containers
Vehicle Maintenance Areas
Vehicle Wash Areas
Wastewater Neutralization Systems
If you checked yes to any of the above, please provide a brief additional description here:

HVAC boiler in QCC and grease traps in both kitchens
-

CORNERSTONE

EARTH GROUP
c::>
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Appendix E Phase 1 Environmental Site Assessment E-89

User Questionnaire Page 3
9) Please indicate if, to your knowledge, any of the following documents exist:

Document

Yes

No
Do Not
Know
Environmental site assessments
Environmental permits or violation notices
Underground or above ground storage tank documents/permits Geotechnical reports or hydrogeologic studies
Risk assessments
Hazardous materials management plans or chemical inventories Safety/emergency response plans or spill prevention plans Compliance audits or community right-to-know plans
Asbestos or lead based paint surveys

If you checked yes to any of the above, please indicate the location of the documents.

Can copies be provided? Yes No

10) Have significant quantities of hazardous materials been used, stored, or generated on -site?

Yes No

If so, please describe the types and quantities and where these materials are or were located.

11) Environmental Liens and AULs: To meet the requirements of 40 CFR § 312.25, a search for the existence of Environmental Liens and Activity and Use Limitations (AULs) ( such as engineering controls, land use restrictions, or institutional controls) must be performed by or on behalf of the party seeking to qualify for Landowner Liability Protection under CERCLA (i.e., the User). Users may rely on transaction- related title insurance documentation such as Preliminary Title Reports and Title Commitments. ASTM E 1527-21 categorizes the requirement to conduct a search for Environmental Liens and AULs as a User responsibility.

Did a search of land title records identify any environmental liens or AULs that are in place or filed or recorded against the subject property under federal, tribal, state, or local law?

Yes No Search not yet completed

Is a Preliminary Title Report or Title Commitment available? If yes, please attach a copy.

Yes No

/uni2714
r:, CORNERSTONE
C : EARTH GROUP
□
□
□
□ □
□
□
□
-
X
X
X
X
X
X
X
X
X
□
E-90 Memorial Park Specific Plan

User Questionnaire Page 4

12) Are you aware of commonly known or reasonably ascertainable information about the site or adjoining properties that would help the environmental professional to identify co nditions indicative of releases or threatened releases? For example, do you know of 1) past uses involving hazardous materials at the site or adjoining properties, 2) specific chemicals that were or are present at the site or adjoining properties, 3) spills or other chemical releases at the site or adjoining properties, or 4) any environmental cleanups at the site or adjoining properties?

Yes No

If so, please briefly describe below, including whether reports documenting the activities are available for review by Cornerstone Earth Group.

13) Are you aware of 1) any pending, threatened or past litigation, or administrative proceedings relevant to hazardous substances or petroleum products at the site, or 2) any notices from any governmental entity regarding possible violations of environmental laws or possible liability related to hazardous substances or petroleum products?

Yes No

If so, please briefly describe below.

14) Do you have any specialized knowledge or experience related to the site or nearby properties that is material to environmental conditions at the site? For example, are you involved in the same line of business as the current or former occupants of the site or an adjoining property so that you would have specialized knowledge of the chemicals and processes used by this type of business?

Yes No

If so, please briefly describe below.

15) In a transaction involving the purchase of commercial real estate, the User must consider the relationship of the purchase price of the property to the fair market value of the property if the property were not affected by hazardous substances. Do you believe that the purchase price of the subject property is lower than the fair market value due to contamination?

Yes No Not Applicable (no purchase involved)

16) Completed by:

Name (print) Company Signature Date
Rudy Lomas City of Cupertino 09/21/2022
/uni2714
/uni2714
/uni2714
/uni2714
-
r:, CORNERSTONE
C : EARTH GROUP
□ □
□ □
□ □
□ □ □
Memorial Park Specific Plan F-1
Geotechnical Evaluation
Appendix F
-
This Page
Intentionally
Left Blank
Appendix F Geotechnical Evaluation F-3
Geotechnical E valuation
Memorial Park
21121 Stevens Creek Boulevard
Cupertino, California
Gates + Associates
1655 N. Main Street, S uite 3 65 | Walnut Creek, California 94596 November 3, 2022 | Project No. 404269001
Geotechnical | Environmental | Construction Inspection & Testing | Forensic Engineering & Expert Witness Geophysics | Engineering Geology | Laboratory Testing | Industrial Hygiene | Occupational Safety | Air Quality | GIS -
G11ofethnlc:tl & EnvkOr'lmOntal ScitJncBS Consullants
F-4 Memorial Park Specific Plan
2149 O’Toole Avenue, Suite 30 | San Jose, California 95131 | p. 408.435.9000 | www.ninyoandmoore.com Geotechnical Evaluation
Memorial Park
21121 Stevens Creek Boulevard
Cupertino, California
Mr. Michael Freitag
Gates + Associates
1655 N. Main Street, Suite 365 | Walnut Creek, California 94596 November 3, 2022 | Proje ct No. 404269001
Ransom H. Hennefer, PE, GE
Principal Engineer
TBG/RHgvr
November 3, 2022
-
Geotechnlcal & Environmental Sciences Consultants
Appendix F Geotechnical Evaluation F-5

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 i

CONTENTS
1 INTRODUCTION 1
2 SCOPE OF SERVICES 1
3 SITE DESCRIPTION AND BACKGROUND 1
4 PROJECT DESCRIPTION 2
5 SUBSURFACE EVALUATION AND LABORATORY TESTING 2
6 GEOLOGIC AND SUBSURFACE CONDITIONS 3

6.1 Regional Geologic Setting 3

6.2 Site Geology 3

6.3 Subsurfa ce Conditions 3

6.3.1 Alluvium 3

6.4 Groundwater 4
7 GEOTECHNICAL CONSIDERATIONS 4

7.1 Seismic Hazards 4

7.1.1 Historical Seismicity 4

7.1.2 Faulting and Ground Surface Rupture 4

7.1.3 Strong Ground Motion 5

7.1.4 Liquefaction and Strain Softening 5

7.1.5 Ground Subsidence 6

7.1.6 Lateral Spread 6

7.1.7 Seismic Slope Stability 6

7.2 Expansive Soil 6

7.3 Static Settlement 6

7.4 Excavation Characteristics 7

7.5 Corrosive/Deleterious Soil 7
8 CONCLUSIONS 7
9 RECOMMENDATIONS 8

9.1 Seismic Design Criteria 8

9.2 Earthwork Recommendations 9

9.2.1 Pre-Construction Conference 9

9.2.2 Site Preparation 9
-
F-6 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 ii

9.2.3 Observation and Removals 10

9.2.4 Material Recommendations 10

9.2.5 Subgrade Preparation 11

9.2.6 Fill Placement and Compaction 12

9.2.7 Temporary Excavations and Shoring 13

9.2.8 Utility Trenches 14

9.3 Foundations 15

9.3.1 Spread Footings 15

9.3.2 Slabs-on-Grade 16

9.3.3 Drilled Piers for Minor Structures 16

9.4 Pavements and Flatwork 17

9.4.1 Asphalt Pavement 17

9.5 Concrete Placement 18

9.6 Review of Construction Plans 18

9.7 Construction Observation and Testing 19
10 LIMITATIONS 19
11 REFERENCES 21
TABLES
1 – California Building Code Seismic Design Criteria 9
2 – Recommended Material Requirements 11
3 – Subgrade Preparation Recommendations 11
4– Fill Placement and Compaction Recommendations 12
5– OSHA Material Classifications and Allowable Slopes 13 6– Recommended Bearing Design Parameters for Footings 15 7– Asphalt Concrete Pavement Sections 18

FIGURES
1 – Site Location
2 – Boring and Test Locations
3 – Fault Locations and Earthquake Epicenters
4 – Regional Geology
5 – Seismic Hazard Zone
-
Appendix F Geotechnical Evaluation F-7

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 iii

APPENDICES
A – Boring Logs
B – Laboratory Testing
C – Corrosivity Testing (CERCO Analytical)
-
F-8 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 1

1 INTRODUCTION
In accordance with your request and authorization, we have performed a geotechnical evaluation for the Memorial Park Project located at 21121 Stevens Creek Boulevard in Cupertino, California (Figure 1). The purpose of our study was to assess the geotechnical conditions at the site and provide recommendations for the design and construction of the proposed improvements. 2 SCOPE OF SERVICES
The services we performed included the following:
• Review of pertinent background data, including aerial photographs and published geologic, seismic, and soils maps and literature.
• A site reconnaissance to observe the general site conditions and to mark the proposed locations for subsurface exploration.
• Coordination with Underground Service Alert (USA) to locate and mark underground utilities in the vicinity of the subsurface exploration locations. • Subcontract a private underground utility survey to further check the exploration locations for underground utility conflicts.
• Procurement of an encroachment permit from the City of Cupertino’s Department of Public Works.
• S ubsurface exploration consisting of seventeen (17) exploratory borings advanced up to 15 feet below existing grade. A representative of Ninyo & Moore logged the subsurface conditions exposed in the borings and collected bulk and relatively undisturbed soil samples for laboratory tests. The borings were backfilled with cement grout , in compliance with the Santa Clara Valley Water District regulations. Drill cuttings were off hauled from the site. • L aboratory testing of selected soil samples to evaluate the geotechnical properties of the subsurface materials including in- situ soil moisture content and density, soil gradation, Atterberg limits, expansion index, R-value, and soil corrosivity. • D ata compilation and engineering analysis of the information obtained from our background review, subsurface evaluation, and laboratory testing.
• Preparation of this geotechnical report presenting our findings and conclusions regarding the subsurface conditions encountered at the project site, and our geotechnical recommendations for the design and construction of the proposed improvements. 3 SITE DESCRIPTION AND BACKGROUND
The project site is located at 21121 Stevens Creek Boulevard in Cupertino, California (Figure 1).

The site is an “L” shaped lot that is bounded to the north by Christensen Drive, to the east by North Stelling Road and Anton Way, to the west by residential properties, and to the south Stevens Creek Boulevard and Alves Drive. Memorial Park is the largest and most well -used park in Cupertino. The 22-acre site includes lawns, a gazebo, an amphitheater, a lighted softball field, -
Appendix F Geotechnical Evaluation F-9

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 2

and six lighted tennis courts. Memorial Park houses the Cupertino Veterans Memorial which honors local veterans, and is adjacent to the Cupertino Senior Center, Quinlan Community Center, and Cupertino Sports Center. The site is relatively flat and lies at elevations of approximately between 286 to 296 feet above mean sea level (Google Earth, 2022). 4 PROJECT DESCRIPTION
Based on documents provided by the city (City of Cupertino, 2022), the plan for the park is the following. The ponds at the site are in the process of being removed. The City has also identified improvements required for the amphitheater. The Memorial Park Specific Plan will determine how to best meet the future recreation, community gathering, event, and green space needs of citizens through enhancement of the park, following the findings and recommendations of the City’s Parks and Recreation System Master Plan. The Master Plan’s vision for the park highlights expansion of the civic event space and community hub experiences by providing a unifying focus to the surrounding existing City facilities, and by enhancing natural site features. 5 SUBSURFACE EVALUATION AND LABORATORY TESTING
Our field exploration included a site reconnaissance and subsurface exploration of the project site. The subsurface exploration was conducted on August 24 and September 19, 2022 and consisted of seventeen ( 17) exploratory borings. The locations of the borings are presented on Figure 2. Prior to commencing the subsurface investigation, USA was notified for field marking of existing utilities and a private utility survey was conducted to further assess and locate any utilities that may conflict with the exploration locations.

The borings were advanced to depths of up to approximately 15 feet below the existing grade with a truck -mounted drill rig equipped with hollow -stem augers. A representative of Ninyo & Moore logged the subsurface conditions exposed in the borings and collected bulk and relatively undisturbed soil samples from the borings. The materials encountered in the borings were classified and logged in accordance with the Unified Soil Classification Syst em (USCS). The samples were then transported to our geotechnical laboratory for testing. The borings were backfilled with cement grout and capped off with soil cuttings in accordance with Santa Clara Valley Water District requirements. Detailed logs of the borings are presented in Appendix A.

Laboratory testing of soil samples recovered from the borings included in-situ soil moisture content and density, soil gradation, Atterberg limits, expansion index, R-value, and soil corrosivity.

The results of the in-place moisture content and dry density tests are shown on the boring logs in Appendix A. The results of the other laboratory tests, excluding the corrosivity testing, are -
F-10 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 3

presented in Appendix B. The results and findings of the corrosivity evaluation are provided in Appendix C.
6 GEOLOGIC AND SUBSURFACE CONDITIONS

6.1 Regional Geologic Setting
The site is located in the southwest ern portion of Santa Clara Valley, which is part of the Coast Ranges geomorphic province of California. The Coast Ranges are comprised of several mountain ranges and structural valleys formed by tectonic processes commonly found around the Circum- Pacific belt. Basement rocks have been sheared, faulted, metamorphosed, and uplifted, and are separated by thick blankets of Cretaceous and Cenozoic sediments that fill structural valleys and line continental margins. The San Francisco Bay Area has several mountain ranges that trend northwest, parallel to major strike-slip faults such as the San Andreas, Hayward, and Calaveras (Figure 3) . Major tectonic activity associated with these and other faults within this regional tectonic framework consists primarily of right-lateral, strike-slip movement.

6.2 Site Geology
A regional geologic map by Dibblee and Minch (2007) indicates that the site is un derlain by Holocene age surficial sediments. Dibblee and Minch describe this unit as alluvial sand, silt, and gravel deposited in the upper part of the alluvial fans formed along the foothills of the Santa Cruz Mountains. A map of the regional geology is presented as Figure 4.

6.3 Subsurface Conditions
The following section provides a generalized description of the materials encountered during our subsurface evaluation at the project site. More detailed descriptions are presented on the boring logs in Appendix A.

6.3.1 Alluvium
Alluvium was encountered in all of the borings to the depths explored. The alluvium encountered in the borings generally consisted of light brown to dark brown, dry to wet, loose to very dense, poorly graded gravel, well- graded gravel with clay and sand, clayey gravel, clayey sand; and dark brown to reddish brown, moist, very stiff to hard, lean clay and silty clay.
-
Appendix F Geotechnical Evaluation F-11

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 4

6.4 Groundwater
Groundwater was not encountered during our subsurface exploration. However, groundwater may rise to a higher level due to the relatively low seepage rate in clay and the limited time for observation. Fluctuations in the groundwater level may occur due to seasonal precipitation, variations in topography or subsurface hydrogeologic conditions, or as a result of changes to nearby irrigation practices or groundwater pumping. In addition, seeps may be encountered at elevations above the historic high groundwater levels due to perched groundwater conditions, leaking pipes, preferential drainage, or other factors not evident at the time of our exploration.

Regional studies by the California Geological Survey (CGS, 2002a) indicate that the depth to historic high groundwater is approximately 50 feet below the ground surface. 7 GEOTECHNICAL CONSIDERATIONS
This study considered a number of potential issues relevant to the proposed construction on the subject site, including seismic hazards, expansive soils, static settlement, excavation characteristics, and soil corrosivity. These issues are discussed in the following subsections.

7.1 Seismic Hazards
The seismic hazards considered in this study include the potential for ground rupture due to faulting, seismic ground shaking, liquefaction, and seismic slope stability. These potential hazards are discussed in the following subsections.

7.1.1 Historical Seismicity
The site is located in a seismically active region. Figure 3 presents the location of the site relative to the epicenters of historic earthquakes with magnitudes of 5.0 or more from 1800 to 2000. Records of historic ground effects related to seismic activity (e.g. liquefaction, sand boils, lateral spreading, ground cracking) compiled by Knudsen et al. (2000), indicate that ground effects related to historic seismic activity have not been reported for the site.

7.1.2 Faulting and Ground Surface Rupture
In response to hazards associated with ground rupture, or surface displacement, the State of California enacted the Alquist -Priolo Earthquake Fault Zoning Act (AP Act) in 1972, which regulates development of structures for human occupancy in areas within active fault zones.

The AP Act requires that the State Geologist delineate zones along active faults where evaluation of the potential for ground rupture is required. As defined by the California -
F-12 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 5

Geological Survey (CGS, 2018), active faults are faults that have caused surface displacement within Holocene time, or within approximately the last 11,700 years.

The site is not located within an Alquist-Priolo Earthquake Fault Zone established by the State Geologist (CGS, 2018). The closest active fault and rupture hazard zone is the Monte Vista Shannon 2011 CFM located about 1.5 miles northwest of the site.

Based on our review of the referenced geologic maps, known active faults are not mapped on the site and the site is not located within a fault -rupture hazard zone. Therefore, the probability of damage from surface fault rupture is considered to be low.

7.1.3 Strong Ground Motion
Based on historic activity, the potential for future strong ground motion at the site is considered significant. Seismic design criteria to address ground shaking are provided in Section 9.1. The peak ground acceleration (PGA) associated with the Maximum Considered Earthquake Geometric Mean (MCE
G) was calculated in accordance with the American
Society of Civil Engineers (ASCE) 7 -16 Standard and the 2019 California Building Code (CBC). The MCE G peak ground acceleration with adjustment for site class effects (PGAM) was calculated as 1.018g using the USGS seismic design tool (SEAOCC & OSHPD, 2020) that yielded a mapped MCE G peak ground acceleration of 0.848g for the site and a site coefficient (FPGA) of 1.2 for Site Class D – Default and Risk Category II.

7.1.4 Liquefaction and Strain Softening
The site is not located within a liquefaction hazard zone (Figure 5) as established by the California Geological Survey (CGS, 2002b). In addition, regional studies of liquefaction susceptibility by the U.S. Geological Survey (Knudsen et al., 2000; and Witter et al., 2006) indicate that the site has a low susceptibility to liquefaction during a moderate to large magnitude earthquake on a nearby fault. Additionally, we did not encounter groundwater to the depths explored, which also indicates that the site has a low susceptibility to liquefaction.

As such, we do not regard seismically induced strain softening, liquefaction induced reduction in bearing capacity, sand- boil-induced ground subsidence, or lateral spreading as design considerations for the project.

-
Appendix F Geotechnical Evaluation F-13

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 6

7.1.5 Ground Subsidence
Sand boils that occur when liquefied, near -surface soil escapes to the ground surface, can result in ground subsidence due to a loss of material that is in addition to dynamic settlement.

We do not anticipate liquefaction at the site and as such, we do not anticipate sand boils and related ground subsidence at the site.

7.1.6 Lateral Spread
In addition to vertical displacements, seismic ground shaking can induce horizontal displacements as surficial soil deposits spread laterally by floating atop liquefied subsurface layers. Lateral spread can occur on sloping ground or on flat ground adjacent to an exposed face. The nearest exposed face slope is Stevens Creek, located approximately 1 mile from the western portion of the site. Based on the site location and our liquefaction analysis, we do not anticipate that lateral spreading will occur near the proposed improvements following a significant seismic event.

7.1.7 Seismic Slope Stability
The site and surrounding area are relatively flat and the site in not within a seismic hazard zone for earthquake-induced landslides as mapped by the state geologist (CGS, 2002b).

7.2 Expansive Soil
Some clay minerals undergo volume changes upon wetting or drying. Unsaturated soil containing those minerals will shrink/swell with the removal/addition of water. The heaving pressures associated with this expansion can damage structures and flatwork. Laboratory testing was performed on a sample of the near-surface soil to evaluate the expansion index. The tests were performed in accordance with American Society of Testing and Materials (ASTM) Standard D 4829 (Expansion Index). The results of our laboratory test indicate that the expansion indices of the samples tested were between 6 to 25 . These results are indicative of a very low to low expansion characteristic.

7.3 Static Settlement
Based on documents provided, we understand that the sustained loads for the proposed structures are expected to be relatively light. We anticipate, therefore, that the total static settlement of drilled pier foundations due to sustained loads will be less than ½ inch, provided the recommendations presented in this report are followed.
-
F-14 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 7

7.4 Excavation Characteristics
We anticipate that the proposed project will involve excavations of up to 15 feet in depth for installation of drilled pier foundations for light poles, shad structures, and play equipment. The soil encountered during our subsurface exploration over this interval generally consisted of firm to stiff clay and medium dense to dense sand and gravel with cobbles . We anticipate that heavy earthmoving equipment in good working condition should be able to make the proposed excavations. Near -vertical cuts or drilled shafts in these materials should not be consider ed stable. Recommendations for excavation stabilization are presented in Section 9.2.8. Excavations are not anticipated to extend below or near historic groundwater levels.

7.5 Corrosive/Deleterious Soil
Corrosivity analysis was performed by CERCO Analytical, Inc. of Concord, California on samples of the near-surface soil from boring B-6a. As reported by CERCO Analytical, the samples were determined to be corrosive based on resistivity test results. CERCO Analytical’s report (see Appendix C) included the following recommendation: “All buried iron, steel, cast iron, ductile iron, galvanized steel and dielectric coated steel or iron should be properly protected against corrosion depending upon the critical nature of the structure. All buried metallic pressure piping such as ductile iron firewater pipelines should be protected against corrosion.” Please refer to the CERCO Analytical report included in Appendix C for more information regarding their test results and brief evaluation.
8 CONCLUSIONS
Based on our review of the referenced background data, site reconnaissance, subsurface evaluation, and laboratory testing, it is our opinion that the proposed construction is feasible from a geotechnical standpoint. Geotechnical considerations include the following:
• The subsurface conditions encountered during our exploration generally consisted of light brown to dark brown, dry to wet, loose to very dense, poorly graded gravel, well-graded gravel with clay and sand, clayey gravel, clayey sand; and dark brown to reddish brown, moist, very stiff to hard, lean clay and silty clay.
• Groundwater was not encountered during our subsurface exploration . Variations in the groundwater level across the site and over time should be anticipated. Regional mapping indicates that the historic high groundwater level is approximately 50 feet below the existing grade.
• We anticipate that the proposed project will involve excavations of up to 15 feet below the existing grade for installation of drilled pier foundations. Stability of excavations will be a concern, particularly where excavation sidewalls are disturbed by construction operations, or -
Appendix F Geotechnical Evaluation F-15

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 8

where excavations encounter relatively cohesionless soil or are exposed to water.

Recommendations for excavation stabilization are provided. • Static settlement should be tolerable for the proposed improvements provided that the proposed structures are supported on foundations that conform with our recommendations and fill placement to raise grades is less than 2 feet in height. • Our laboratory test results indicate that the near-surface soil has a very low to low expansion characteristic.
• Based on the results of the soil corrosivity tests during this study, the soils are considered to be corrosive (Appendix C) to buried ferrous metals as is typical for the area. Buried metals, such as play equipment, should be properly protected against corrosion. Corrosion protection measures should be discussed with the equipment manufacturer and may include corrosion resistant paint or other coatings.
9 RECOMMENDATIONS
The following sections present our geotechnical recommendations for the design and construction of the proposed improvements. The project improvements should be designed and constructed in accordance with these recommendations, applicable codes, and appropriate construction practices.

9.1 Seismic Design Criteria
Seismic Site Class D -default was selected. Table 1 presents the Risk -Targeted, Max imum Considered Earthquake (MCE R) spectral response accelerations consistent with the 2019 California Building Code and corresponding site -adjusted and design level spectral response accelerations based on the USGS seismic design maps using the ASCE 7 Hazard Tool (ASCE, 2021). The values provided in the table may be used for structures with a fundamental period of

0.5 seconds or less presuming that the seismic response coefficient is calculated from equation

12.8-2 of ASCE Standard 7- 16 in accordance with Exception 2 in Section 11.4.8 of ASCE Standard 7-16.
-
F-16 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 9

Table 1 – California Building Code Seismic Design Criteria Seismic Design Parameter Section 11.4 ASCE 7-16
Site Class D - Default
Site Coefficient, Fa 1.2
Site Coefficient, Fv -
Mapped Spectral Response Acceleration at 0.2-second period, SS 2.056 Mapped Spectral Response Acceleration at 1.0-second period, S1 0.735 Site-Adjusted Spectral Acceleration at 0.2-second period, SMS 2.467 g Site-Adjusted Spectral Acceleration at 1.0-second period, SM1 - Design Spectral Response Acceleration at 0.2-second Period, SDS 1.644 g Design Spectral Response Acceleration at 1.0-second Period, SD1 - Seismic Design Category for Risk Category I, II, or III -

9.2 Earthwork Recommendations
Earthwork should be performed in accordance with the requirements of applicable governing agencies and the recommendations presented below. The geotechnical consultant should observe foundation excavations and earthwork operations. Evaluations performed by the geotechnical consultant during the course of operations may result in new recommendations, which could supersede the recommendations in this section.

9.2.1 Pre-Construction Conference
We recommend that a pre-construction conference be held to discuss the recommendations presented in the report. Representatives of the District, the design engineer, Ninyo & Moore, and the contractor should be in attendance to discuss project schedule and earthwork requirements.

9.2.2 Site Preparation
Site preparation should begin with the removal of existing vegetation, utility lines, debris and other deleterious materials from areas to be graded. Tree stumps and roots should be removed to such a depth that organic material is generally not present. Clearing and grubbing should extend beyond the proposed excavation and fill areas. Rubble and excavated materials that do not meet criteria for use as fill should be disposed of in an appropriate landfill. Existing utilities in the work area should be relocated away from the proposed structures. Existing utilities to be abandoned should be removed, crushed in place, or backfilled with grout.
-
Appendix F Geotechnical Evaluation F-17

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 10

Excavations resulting from removal of buried utilities, tree stumps, or obstructions should be backfilled with compacted fill in accordance with the recommendations in the following sections.

9.2.3 Observation and Removals
Prior to placement of fill, or the placement of forms or reinforcement for foundations, the client should request an evaluation of the exposed subgrade by Ninyo & Moore. Materials that are considered unsuitable shall be excavated under the observation of Ninyo & Moore in accordance with the recommendations in this section or supplemental recommendations by the geotechnical engineer.

Unsuitable materials include, but may not be limited to dry, loose, soft, wet, expansive, organic, or compressible natural soil, and undocumented or otherwise deleterious fill materials. Unsuitable materials should be removed from trench bottoms and below bearing surfaces to a depth at which suitable foundation subgrade is exposed, as evaluated in the field by Ninyo & Moore.

9.2.4 Material Recommendations
Materials used during earthwork, grading, and paving operations should comply with the requirements listed in Table 2. Materials should be evaluated by the geotechnical engineer for suitability prior to use. The contractor should notify the geotechnical consultant prior to import of materials or use of on -site materials to permit time for sampling, testing, and evaluation of the proposed materials. On-site materials may need to be dried out before re- use as fill. The contractor should be responsible for the uniformity of import material brought to the site.
-
F-18 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 11

Table 2 – Recommended Material Requirements
Material and Use Source Requirements1,2,3
General Fill Import or On-
site Borrow
Close-graded with 35 percent or more
passing No. 4 sieve and either:

Expansion Index of 50 or less,
Plasticity Index of 12 or less,
or less than 10 percent, by dry weight,
passing No. 200 sieve
Pipe/Conduit Bedding and Pipe Zone
Material
-material below conduit invert to 12
inches above conduit
Import 90 to 100 percent (by mass) should pass No.
4 sieve, and 5 percent or less should pass
No. 200 sieve
Trench Backfill
- above bedding material
Import or On-
site Borrow
As per general fill and excluding rock/lumps
retained on 4-inch sieve or 2-inch sieve in top
12 inches
Controlled Low Strength
Material (CLSM)
Import CSS5 Section 19-3.02G
Notes:
1 In general, fill should be free of rocks or lumps in excess of 6 inches in diameter, trash, debris, roots, vegetation or other deleterious material.
2 In general, import fill should be tested or documented to be non-corrosive4 and free from hazardous materials in concentrations above levels of concern.
3 The specification of utility owner or local agency may supersede the indicated requirements in this table. 4 Non-corrosive as defined by the Corrosion Guidelines (Caltrans, 2021). 5 CSS is California Standard Specifications (Caltrans, 2018).

9.2.5 Subgrade Preparation
Subgrade below slabs or fill should be prepared as per the recommendations in Table 3 .

Prepared subgrade should be maintained in a moist (but not saturated) condition by the periodic sprinkling of water prior to placement of additional overlying fill. Subgrade that has been permitted to dry out and loosen or develop desiccation cracking, should be scarified, moisture-conditioned, and recompacted as per the requirements above.

Table 3 – Subgrade Preparation Recommendations
Subgrade Location Source
Below Slabs,
Pavement, and General
Fill
• After clearing per Section 9.2.2, check for unsuitable materials as per Section 9.2.4.
• Scarify 8 inches then moisture condition and compact as per Section 9.2.7.
• Keep in moist condition by sprinkling water.
-
Appendix F Geotechnical Evaluation F-19

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 12

9.2.6 Fill Placement and Compaction
Fill and backfill should be compacted in horizontal lifts in conformance with the recommendations presented in Table 4. The allowable uncompacted thickness of each lift of fill depends on the type of compaction equipment utilized, but generally should not exceed 8 inches in loose thickness.

Table 4– Fill Placement and Compaction Recommendations Fill Type Location
Compacted
Density1
Moisture
Content2
Subgrade
Below pavement (within 12 inches of
finished subgrade) 95 percent + 2 percent or
above
Below slabs or fill and in locations not
already specified 90 percent + 2 percent or
above
General Fill
Below pavement (within 12 inches of
finished subgrade) 95 percent + 2 percent or
above
In locations not already specified 90 percent + 2 percent or above
Bedding and
Pipe Zone Fill
Material below invert to 12 inches above
pipe or conduit 90 percent Within +/- 2
Optimum
Trench Backfill
Top 12 inches below finish subgrade for
areas subject to vehicular loading 95 percent + 2 percent or above
In locations not already specified 90 percent + 2 percent or above
Aggregate Base Below slabs or pavement 95 percent Near Optimum Notes:
1 Expressed as percent relative compaction or ratio of field density to reference density (typically on a dry density basis for soil and aggregate). The reference density of soil and aggregate should be evaluated by ASTM D 1557. 2 Target moisture content at compaction relative to the optimum as evaluated by ASTM D 1557 Compacted fill should be maintained in a moist (but not saturated) condition by the periodic sprinkling of water prior to placement of additional overlying fill. Fill that has been permitted to dry out and loosen or develop desiccation cracking, should be scarified, mois ture- conditioned, and recompacted as per the requirements above.

-
F-20 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 13

9.2.7 Temporary Excavations and Shoring
Trench excavations shall be stabilized in accordance with the Excavation Rules and Regulations (29 Code of Federal Regulations [CFR], Part 1926) stipulated by the Occupational Safety and Health Administration (OSHA). Stabilization shall consist of shoring sidewalls or laying slopes back.

Dewatering pits or sumps should be used to depress the groundwater level (if encountered) below the bottom of the excavation. Table 5 lists the OSHA material type classifications and corresponding allowable temporary slope layback inclinations for soil deposits that may be encountered on site. We encountered granular soils that consisted of loose to very dense, silty sand during our subsurface investigation, which corresponds to OSHA Type C soil. If materials other than those anticipated are encountered, Ninyo & Moore should be provided an opportunity to review subsurface conditions. Alternatively, an internally -braced shoring system or trench shield conforming to the OSHA Excavation Rules and Regulations (29 CFR, Part 1926) may be used to stabilize excavation sidewalls during construction. The lateral earth pressures listed in Table 6 may be used to design or select the internally-braced shoring system or trench shield. The recommendations listed in Table 6 are based upon the limited subsurface data provided by our subsurface exploration and reflect the influence of the environmental conditions that existed at the time of our exploration. Excavation stability, material classifications, allowable slopes, and shoring pressures should be re-evaluated and revised, as-needed, during construction. Excavations, shoring systems and the surrounding areas should be evaluated daily by a competent person for indications of possible instability or collapse.

Table 5– OSHA Material Classifications and Allowable Slopes Formation OSHA
Classification
Allowable
Temporary Slope1,2,3
Lateral Earth
Pressure on
Shoring4 (psf)
Alluvium
(above groundwater) Type C 1½ h:1v (34°) 80×D + 72
Notes:
1 Allowable slope for excavations less than 20 feet deep. Excavation sidewalls in cohesive soil may be benched to meet the allowable slope criteria (measured from the bottom edge of the excavation). The allowable bench height is 4 feet. The bench at the bottom of the excavation may protrude above the allowable slope criteria. 2 In layered soil, layers shall not be sloped steeper than the layer below. 3 Temporary excavations less than 5 feet deep may be made with vertical side slopes and remain unshored if judged to be stable by a competent person (29 CFR, Part 1926.650).
4 ‘D’ is depth of excavation for excavations up to 20 feet deep. Includes a surface surcharge equivalent to two feet of soil. -
Appendix F Geotechnical Evaluation F-21

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 14

The shoring system should be designed or selected by a suitably qualified individual or specialty subcontractor. The shoring parameters presented in this report are preliminary design criteria, and the designer should evaluate the adequacy of these parameters and make appropriate modifications for their design. We recommend that the contractor take appropriate measures to protect workers. OSHA requirements pertaining to worker safety should be observed.

Excavations made in close proximity to existing structures may undermine the foundation of those structures and/or cause soil movement related distress to the existing structures.

Stabilization techniques for excavations in close proximity to existing structures will need to account for the addit ional loads imposed on the shoring system and appropriate setback distances for temporary slopes. The contractor should be solely responsible for protection of existing site improvements and provide shoring and/or underpinning as needed.

The excavation bottoms may encounter wet, loose material which may be subject to pumping under heavy equipment loads. The contractor should be prepared to stabilize the bottom of the excavations. In general, unstable bottom conditions may be mitigated by using a stabilizing geogrid, overexcavating the excavation bottom to suitable depths and replacing with compacted fill, or other suitable method. Additionally, aeration of wet soils should be anticipated.

9.2.8 Utility Trenches
Trenches constructed for the installation of underground utilities should be stabilized in accordance with our recommendations in Section 9.2.9. Utility trenches should be backfilled with materials that conform to our recommendations in Section 9.2.5. Trench backfill, bedding, and pipe zone fill should be compacted in accordance with Section 9.2.7 of this report. Bedding and pipe zone fill should be shoveled under pipe haunches and c ompacted by manual or mechanical, hand- held tampers. Trench backfill should be compacted by mechanical means. Densification of trench backfill by flooding or jetting should not be permitted.

Trenches should not be excavated adjacent to footings. If trenches are to be excavated near a continuous footing, the bottom of the trench should be located above a 2:1 (horizontal to vertical) plane projected downward from the bottom of the footing. Utility lines that cross beneath footings should be encased in concrete or CLSM below the footing for a distance equivalent to the depth of the excavation.
-
F-22 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 15

9.3 Foundations
Foundations should be designed in accordance with structural considerations and our geotechnical recommendations. In addition, requirements of the governing jurisdictions, practices of the Structural Engineers Association of California, and applicable building codes should be considered in the design of the structures. Maximum static settlement due to building loads is anticipated to be on the order of ½ inch.

9.3.1 Spread Footings
Footings bearing on subgrade prepared as per the recommendations in Section 9.2.6 . The footings may be designed using the criteria listed in Table 6 . The geotechnical engineer should observe the footing excavations to evaluate bearing materials and subgrade condition before the exposed subgrade is covered.

Table 6– Recommended Bearing Design Parameters for Footings Footing Sustained
Loads
Footing
Widths
Bearing
Depth1
Allowable
Bearing
Capacity2
Static
Settlement
Wall Footing 3 kips/foot or
less
12 inches
or more
2 feet
or more 3,000 psf ½ -inch total
Column Footing 12 kips
or less
24 inches
or more
2 feet
or more 3,000 psf ½ -inch total
Notes:
1 Below the adjacent finish grade and the existing grade. 2 Net allowable bearing capacity in pounds per square foot with Safety Factor of 2 or more. Allowable bearing capacity may be increased by one-third for wind or seismic load combinations.

Structures supported on footings consistent with these recommendations should be designed for the total and differential settlements listed in Table 6 for sustained loads.

The spread footings should be reinforced with deformed steel bars as detailed by the project structural engineer. Where footings are located adjacent to utility trenches or other excavations, the footing bearing surfaces should bear below an imaginary plane extending upward from the bottom edge of the adjacent trench/excavation at a 1½:1 (horizontal to vertical) angle above the bottom edge of the footing. Footings should be deepened or excavation depths reduced as-needed. Footing bottoms should not be sloped more than 1- unit vertical to 10 units horizontal. Wall footings may be stepped provided that the bearing grade differential between adjacent steps does not exceed 18 inches and the slope of a series of such steps does not exceed 1-unit vertical to 2 units horizontal. -
Appendix F Geotechnical Evaluation F-23

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 16

A lateral bearing pressure of 300 psf per foot of depth up to 3,000 psf may be used to evaluate the resistance of footings to lateral loads. The recommended lateral bearing pressure is for level and gently sloping ground conditions where the ground slope adjacent to the foundation is 5 percent or less. The lateral bearing pressure should be neglected to a depth of 12 inches where the ground adjacent to the foundation is not covered by a slab or pavement. The lateral bearing pressure may be increased by one- third when considering loads of short duration such as wind or seismic forces. A friction coefficient of 0.35 may be assumed for evaluating frictional resistance to lateral loads. A dry unit weight of 90 pounds per cubic foot (pcf) for soil, 120 pcf for aggregate and 150 pcf for normal weight concrete may be assumed for this evaluation.

9.3.2 Slabs-on-Grade
Building floor slabs should be designed by the project structural engineer based on the anticipated loading conditions. The subgrade should be prepared in accordance with Section

9.2.6. Where a vapor retarding system is not used, slabs should be constructed on 6 inches, or more, of aggregate base conforming to Section 9.2.5 and placed in accordance with Section 9.2.7. The slab should be reinforced with deformed steel bars. We recommend that masonry briquettes or plastic chairs be used to aid in the correct placement of slab reinforcement in the upper half of the slab. Refer to Section 9.5 for the recommended concrete cover over reinforcing steel. A vapor retarder is recommended in areas where moisture-sensitive floor coverings or conditioned environments are anticipated. Joints consistent with ACI guidelines (ACI, 2020) may be constructed at periodic intervals to reduce the potential for random cracking of the slab.

9.3.3 Drilled Piers for Minor Structures
Drilled piers for minor structures such as fences and light poles embedded 5 to 25 feet below grade may be designed for an allowable side friction of 300 psf to evaluate resistance to downward axial loads and 200 psf per foot depth for upward axial loads. The allowable skin friction includes a factor of safety of 2 for downward loading and 3 for upward loading. The allowable side friction may be increased by one-third when considering loads of short duration such as wind or seismic loads. The spacing between adjacent piers should be equivalent to eight pier diameters, or more to mitigate reduction due to group effects.

A lateral bearing pressure of 300 pounds per square foot (psf) per foot depth up to 3,000 psf may be used to evaluate resistance to lateral loads and overturning moments in accordance with Section 1806 of the 2019 CBC. The allowable lateral bearing pressure may be increased -
F-24 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 17

by one-third for wind or seismic load combinations and by an additional factor of two for structures that can accommodate ½ inch of lateral deflection of the top of the pier foundation.

Drilled pier excavations should be cleaned of loose material prior to pouring concrete. Drilled pier excavations that encounter groundwater or cohesionless soil may be unstable and may need to be stabilized by temporary casing or use of drilling mud. Standing water should be removed from the pier exc avation or the concrete should be delivered to the bottom of the excavation, below the water surface, by tremie pipe. Casing should be removed from the excavation as the concrete is placed. Concrete should be placed in the piers in a manner that reduces the potential for segregation of the components. Piers should be completed with concrete the same day as the excavation is completed.

9.4 Pavements and Flatwork
Recommendations for pavement and exterior flatwork are presented in the following sections. A design R-value of 20 was selected based on subsurface soil encountered . The pavement subgrade should be observed by the geotechnical engineer during grading to check the finish subgrade for consistency with the assumed condition. Recommendations for preparation of subgrade are presented in Section 9.2.6.

9.4.1 Asphalt Pavement
Based on the damage observed along the pedestrian pathways, we recommend complete removal of the existing pavement sections and reconstruction with a new section of aggregate base and asphalt concrete. The existing aggregate base and asphalt concrete may be processed to meet Caltrans Class 2 Aggregate Base specifications for re-use.

Ninyo & Moore conducted an analysis to evaluate appropriate asphalt pavement structural sections following the methodology presented in the Highway Design Manual (Caltrans, 2020). Alternative sections were evaluated for pedestrian and vehicular loading. The pavement sections were designed for a 20 -year service life presuming that periodic maintenance, including crack sealing and resurfacing will be performed during the service life of the pavement. Premature deterioration may occur without periodic maintenance. Our recommendations for the pavement sections are presented in Table 7. -
Appendix F Geotechnical Evaluation F-25

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 18

Table 7– Asphalt Concrete Pavement Sections
Traffic Index R-Value Alternative 1 Alternative 2
3 (Light Vehicular Traffic) 20 3½ inches AC 2 inches AC 4½ inches AB
6 (Fire Lanes) 20 8 inches AC 3½ inches AC
9½ inches AB
Notes:
1 AC is Type A, Dense-Graded Hot Mix Asphalt complying with Caltrans Standard Specification 39-2 (2018). 2 AB is Class 2 Aggregate Base complying with Caltrans Standard Specification 26-1.02 (2018).

Aggregate base for pavement should be placed in lifts of no more than 8 inches in loose thickness and compacted per Section 9.2.7. Asphalt concrete should be placed and compacted in accordance with Caltrans Standard Specification and Construction Manual; asphalt concrete should be compacted to between 92 and 96 percent of the theoretical maximum specific gravity and density (Rice gravity – ASTM D 2041) of the material.

Pavements should be sloped so that runoff is diverted to an appropriate collector (concrete gutter, swale, or area drain) to reduce the potential for ponding of water on the pavement.

Concentration of runoff over asphalt pavement should be discouraged.

9.5 Concrete Placement
Concrete in contact with soil or water that contains high concentrations of soluble sulfates can be subject to chemical and/or physical deterioration. The sulfate ion concentration was measured 49 mg/kg and is determined to be insufficient to damage reinforced concrete structures, however due to the potential variability in soil conditions across the site, we recommend that Type V cement with a water/cement ratio of 0.45 or less be considered for the project.

9.6 Review of Construction Plans
The recommendations provided in this report are based on preliminary design information for the proposed construction. We recommend that a copy of the plans be provided to Ninyo & Moore for review before bidding to check the interpretation of our recommendations and that the designed improvements are consistent with our assumptions. It should be noted that, upon review of these documents, some recommendations presented in this report might be revised or modified to meet the project requirements.
-
F-26 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 19

9.7 Construction Observation and Testing
The recommendations provided in this report are based on subsurface conditions encountered in discrete exploratory borings. During construction, the geotechnical engineer or his representative in the field should be allowed to check the exposed subsurface conditions. During construction, the geotechnical engineer or his representative should be allowed to:
• Check for unsuitable materials and observe foundation excavations. • Observe preparation and compaction of subgrade.
• Check and test imported materials prior to import to the project site. • Observe placement and compaction of fill.
• Perform field density tests to evaluate fill and subgrade compaction. • Observe placement of reinforcing steel and concrete in drilled piers and slabs.

The recommendations provided in this report assume that Ninyo & Moore will be retained as the geotechnical consultant during the const ruction phase of the project. If another geotechnical consultant is selected, we request that the selected consultant provide a letter to the architect and the owner (with a copy to Ninyo & Moore) indicating that they fully understand Ninyo & Moore’s recommendations, and that they are in full agreement with the recommendations contained in this report. Ninyo & Moore cannot assume responsibility for aspects of construction for which we have not been given an opportunity to observe/test.
10 LIMITATIONS
The field evaluation, laboratory testing, geotechnical analyses, and assessment of geologic hazards presented in this report have been conducted in general accordance with current practice and the standard of care exercised by geotechnical consultants performing si milar tasks in the project area at the time this report was prepared. No warranty, expressed or implied, is made regarding the conclusions, recommendations, and opinions presented in this report. There is no evaluation detailed enough to reveal every subsurface condition. Variations may exist, and conditions not observed or described in this report may be encountered during construction.

Uncertainties relative to subsurface conditions can be reduced through additional subsurface exploration. Additional subsurface evaluation will be performed upon request. Please also note that our evaluation was limited to assessment of the geotechnical aspects of the project, and did not include evaluation of structural issues, environmental concerns, or the presence of hazardous materials.
-
Appendix F Geotechnical Evaluation F-27

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 20

This document is intended to be used only in its entirety. No portion of the document, by itself, is designed to completely represent any aspect of the project described herein. Ninyo & Moore should be contacted if the reader requires additional information or has questions regarding the content, interpretations presented, or completeness of this document.

This report is intended for design purposes only. It does not provide sufficient data to prepare an accurate bid by contractors. It is suggested that the bidders and their geotechnical consultant perform an independent evaluation of the subsurface conditions in the project areas. The independent evaluations may include, but not be limited to, review of other geotechnical reports prepared for the adjacent areas, site reconnaissance, and additional exploration and laboratory testing.

Our conclusions, recommendations, and opinions are based on an analysis of the observed site conditions. If geotechnical conditions different from those described in this report are encountered, our office should be notified and additional recommendations will be provided, as appropriate. It should be understood that the conditions of a site could change with time as a result of natural processes or the activities of man at the subject site or nearby sites. In addition, changes to the applicable laws, regulations, codes, and standards of practice may occur due to government action or the broadening of knowledge. The findings of this report may, therefore, be invalidated over time, in part or in whole, by changes over which Ninyo & Moore has no control.

This report is intended exclusively for use by the client. Any use or reuse of the findings, conclusions, and/or recommendations of this report by parties other than the client is undertaken at said parties’ sole risk.

-
F-28 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022 21

11 REFERENCES
American Concrete Institute, 2021, ACI Manual of Concrete Practice.

American Concrete Institute, 2014, Building Code Requirements for Structural Concrete (ACI 318- 14) - Commentary on Building Code Requirements for Structural Concrete (ACI 318R-14).

American Society of Civil Engineers (ASCE), 2016, Minimum Design Loads and Associated Criteria for Building and Other Structures, ASCE Standard 7-16.

American Society of Civil Engineers (ASCE), 2021, ASCE 7 Hazard Tool, https://asce7hazardtool.online/
California Building Standards Commission (CBSC), 2019 , California Building Code (CBC), Tit le 24, Part 2, Volumes 1 and 2.

California Department of Transportation (Caltrans), 2018, Standard Specifications.

California Department of Transportation (Caltrans), 2020, Highway Design Manual, https://dot.ca.gov/programs/design/manual-highway-design-manual-hdm.

California Department of Transportation (Caltrans), 2021, Corrosion Guidelines, Version 3.2, Division of Engineering Services, Materials Engineering and Testing Services, Corrosion Branch: dated May.

California Geological Survey (CGS), 2002a, Seismic Hazard Zone Report for the Cupertino 7.5- Minute Quadrangle, Santa Clara Valley, California, Seismic Hazard Zone Report 068.

California Geological Survey (CGS), 2007, Special Publication 42 - Fault Rupture Hazard Zones in California, Alquist-Priolo Earthquake Fault Zoning Act with Index to Earthquake Fault Zones Maps, by Bryant, W.A. and Hart, E.W.

California Geological Survey (CGS), 2018, Earthquake Fault Zones, A Guide for Government Agencies, Property Owners/Developers, and Geoscience Practitioners for Assessing Fault Rupture Hazards in California: California Geologic Survey Special Publication 42.

City of Cupertino, 2022, Memorial Park Specific Plan, EngageCupertino_Draft content , https://docs.google.com/document/d/1o7fSGt_Mt641L-z0oc5RVIlbFFlLzXJoACdY43Ds hYY/edit
Dibblee, T.W., Jr. and Minch, J.A., 2007, Geologic Map of the Cupertino and San Jose West Quadrangles, Santa Clara and Santa Cruz Counties, California: Dibblee Geological Foundation, Dibblee Foundation Map DF-351, scale 1:24,000 Google Earth, 2022, Google Earth Pro 7.3.3.7699, http://earth.google.com/.

Knudsen, K.L., Sowers, J.M., Witter, R.C., Wentworth, C.M., Helley, E.J., Nicholson, R.S., Wright, H.M., and Brown, K.H., 2000, Preliminary Maps of Quaternary Deposits and Liquefaction Susceptibility, Nine-County San Francisco Bay Region, California: a digital database: U.S.

Geological Survey, Open-File Report OF-2000-444, Scale 1:275,000.

Occupational Safety and Health Administration (OSHA), 1989, Occupational Safety and Health Standards – Excavations, Department of Labor, Title 29 Code of Federal Regulations (CFR) part 1926, dated October 31.

Witter, R.C., Knudsen, K.L, Sowers, J.M., Wentworth, C.M., Koehler, R.D., and Randolph, C.E., 2006, Maps of Quaternary Deposits and Liquefaction Susceptibility in the Central San Francisco Bay Region, California: U.S. Geological Survey Open -File Report 2006-1037, Scale 1:200,000 (http://pubs.usgs.gov/of/2006/1037/).

-
Appendix F Geotechnical Evaluation F-29

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

Appendix A

Photographic Documentation

FIGURES

-
F-30 Memorial Park Specific Plan
SITE

MEMORIAL PARK
21121 STEVENS CREEK BOULEVARD

CUPERTINO, CALIFORNIA

SITE LOCATION
Geotechnical & Environmental Sciences Consultants
FIGURE 1
NOTE: DIMENSIONS, DIRECTIONS, AND LOCATIONS ARE APPROXIMATE I REFERENCE: USGS, 2018 0

SCALE (FEET)
2,000 4,000
N
404269001 I 11/22
404269001.dwg 11/02/2022 AEK
~ S· ,
~
1 51
Cl'
I
1-d ' ~~~
\I.

Appendix F Geotechnical Evaluation F-31

N STELLING RD

MARY AVE

STEVENS CREEK BLVD

PATRIOT WAY
B-1a
(1.5')
B-1
(15.0')
B-3a
(1.7')
B-3
(6.5')
B-6a
(1.2')
B-6
(6.5')
B-10a
(1.0')
B-10
(15.0')
B-11a
(1.3')
B-11
(11.5')
B-4
(11.5')
B-2
(11.5')
B-5
(6.5')
B-10
(10.5')
B-9
(15.0')
B-8
(6.5')

CHRISTENSEN DR

ALVES DR

ANTON WAY

EXPLORATION LOCATIONS
Geotechnical & Environmental Sciences Consultants
FIGURE 2
NOTE: DIMENSIONS, DIRECTIONS, AND LOCATIONS ARE APPROXIMATE I REFERENCE: GOOGLE EARTH, 2022 0

SCALE (FEET)
200 400
N
404269001.dwg 11/02/2022 AEK
LEGEND
BORING LOCATION (09/19/2022)
(TOTAL DEPTH, IN FEET)

PROJECT BOUNDARY
B-1
(15.0')

MEMORIAL PARK
21121 STEVENS CREEK BOULEVARD

CUPERTINO, CALIFORNIA
404269001 I 11/22
B-1a
(1.5')
BORING LOCATION (08/24/2022)
(TOTAL DEPTH, IN FEET)
-
F-32 Memorial Park Specific Plan
P a c i fic
O c e an
San
Pabl o
Bay
San
F r a n c isco
Bay
S u i sun
Bay
SAN

ANDREAS
FAULT
ZONE
HAYW
ARD
FAULT
ZONE

CALAV E
RAS
GR E
EN V
ILLE
FAULT
ZO
NE
G
REEN
VA
LLE
Y
FA
U
LT
ZO
N
E
RO
DG
ERS
CREEK
FAULT
ZONE

CHABO T
FAUL
W
E
S
T
N
A
PA
FA
U
LT
ZO
N
E
POINT
REYES
FAULT

CONCORD
FAU L
T

FRANKLIN
FAULT

LAKEVIEW
FAULT

CALVERAS
FAU
LT
ZO
N
E
SERRA
FAULT
ZONE
Oakland
SILV
T
ER
CREEK
FAULT
Z

MISSION
FAULT
ONE
MONTE

VISTA-SHANNON

CASCADE
FAULT
ZONE

STANFORD FAULT

PILARCITOS
FAULT
SA
N
G
R
EG
O
R
IO
FA
U
LT
ZO
N
E
BUTANO

FAULTZ AYA N T E - VE R GEL E S FAULT ZONE

FA U LT Z O N E

BERROCAL
FAULT
ZONE

P IE RC Y
FAULT
S A
N

ANDREAS
FAULT
ZONE
Solano
County
Marin
County
Contra Costa
County
Alameda
County
San Francisco
County
San Mateo
County
Sacramento
County
Colma
Novato Vallejo
Concord
Hayward
Rio Vista
Fairfield
San Mateo
Brentwood
Livermore
San
Francisco
San Jose
18980331

6.4 19060418

7.8 18681021

7.0 18380600

7.4 Morgan
Hill

CALIFORNIA
LEGEND

HOLOCENE ACTIVE

CALIFORNIA FAULT ACTIVITY

HISTORICALLY ACTIVE

LATE QUATERNARY

QUATERNARY

STATE/COUNTY BOUNDARY
MAGNITUDE 5.0 - 5.9
MAGNITUDE 6.0 - 6.9
MAGNITUDE 7.0 - 7.9

EARTHQUAKE EPICENTERS
(DATE/MAGNITUDE)
404269001-Fig3-FL.pdf 10/02/2022 AEK
NOTE: DIRECTIONS, DIMENSIONS, AND LOCATIONS ARE APPROXIMATE FIGURE 3
0 10 20

SCALE (MILES)
SOURCES: CALIFORNIA GEOLOGICAL SURVEY, 2010, FAULT ACTIVITY MAP OF CALIFORNIA; CALIFORNIA GEOLOGICAL SURVEY, 2000, MAP SHEET 49
SITE

FAULT LOCATIONS AND EARTHQUAKE EPICENTERS

MEMORIAL PARK
21121 STEVENS CREEK BOULEVARD

CUPERTINO, CALIFORNIA
4042696001 |11/22
SAN
JOSE
FAULT
-
•
• •
JVin90& J\'\OOt'e
Geotechnic:al & Env1r·onmental Sclen"e5 Con5ullint1
•
Appendix F Geotechnical Evaluation F-33
SITE

REGIONAL GEOLOGY
Geotechnical & Environmental Sciences Consultants
FIGURE 4
0 SCALE (FEET)
2,000 4,000
N
404269001.dwg 11/02/2022 AEK
LEGEND
NOTE: DIMENSIONS, DIRECTIONS, AND LOCATIONS ARE APPROXIMATE I REFERENCE: DIBBLEE, 2007 Qa ALLUVIAL GRAVEL, SAND,

SILT, & CLAY(HOLOCENE)

STRIKE AND DIP

OF BEDDING

GEOLOGIC CONTACT
FAULT

THRUST FAULTOLDER ALLUVIAL TERRACE

GRAVEL, SAND, & CLAY,

UNDEFORMED (PLEISTOCENE)
Qa.1 ALLUVIAL SAND, SILT,
& GRAVEL (HOLOCENE)
Qoa/
Qt
Qa.2 ALLUVIAL GRAVEL, SAND,

SILT, & CLAY (HOLOCENE)

SANTA CLARA FORMATION/

NONMARINE SEDIMENTARY ROCKS
(PLEISTOCENE/PLIOCENE)
Qsc/
QTs
MONTEREY FORMATION;
SILICEOUS SHALE (MIOCENE)Tm

MATADERO

SANDSTONE
(MIOCENE)
Tms

MEMORIAL PARK
21121 STEVENS CREEK BOULEVARD

CUPERTINO, CALIFORNIA
404269001 I 11/22
D
D
D
U..J ~ t- , ' ,,,. ) r1
1 _ .,~ r "'"N• >If
-~ • ' \. ~ ' I
D
D
D
i -·
• ti
- ' H
A~ • -
D
r'""
227
\
L- '
:r
h
! /-
•• So ~ •• ,~1-y\Jll
- !;~ ~rl !&\·~-~
1· 1r ~ ..i. rort
l..' ., Sch
- l -
_l_
-
F-34 Memorial Park Specific Plan
SITE

SEISMIC HAZARD ZONES
Geotechnical & Environmental Sciences Consultants
FIGURE 5
0 SCALE (FEET)
2,000 4,000
N
404269001.dwg 11/02/2022 AEK
NOTE: DIMENSIONS, DIRECTIONS, AND LOCATIONS ARE APPROXIMATE REFERENCE: CGS, 1974, 2002
LEGEND
EARTHQUAKE-INDUCED LANDSLIDE ZONES:

Areas where previous occurrence of landslide movement, or local topographic, geological, geotechnical, and subsurface water conditions indicate a potential for permanent ground displacements such that mitigation as defined in Public Resources Code Section 2693(c) would be required.

LIQUEFACTION ZONES:

Areas where historic occurrence of liquefaction, or local geological, geotechnical, and groundwater conditions
indicate a potential for permanent ground displacements such that mitigation as defined in Public Resources Code Section 2693(c) would be required.

MEMORIAL PARK
21121 STEVENS CREEK BOULEVARD

CUPERTINO, CALIFORNIA
404269001 I 11/22
-
Appendix F Geotechnical Evaluation F-35
Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

APPENDIX A
Boring Logs
-
F-36 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

APPENDIX A

BORING LOGS
Field Procedure for the Collection of Disturbed Samples Disturbed soil samples were obtained in the field using the following method.

Bulk Samples
Bulk samples of representative earth materials were obtained from the exploratory borings. The samples were bagged and transported to the laboratory for testing.

Field Procedure for the Collection of Relatively Undisturbed Samples Relatively undisturbed soil samples were obtained in the field using the following method.

The Modified Split-Barrel Drive Sampler
The sampler, with an external diameter of 3.0 inches, was lined with 6-inch long, thin brass liners with inside diameters of approximately 2.4 inches. The sample barrel was driven into the ground with the weight of a hammer in general accordance with ASTM D 3550. The driving weight was permitted to fall freely. The approximate length of the fall, the weight of the hammer, and the number of blows per foot of driving are presented on the boring log as an index to the relative resistance of the materials sampled. The samples were removed from the sample barrel in the brass liners, sealed, and transported to the laboratory for testing.

-
Appendix F Geotechnical Evaluation F-37
0 �
�0
��
20 �����
SM
CL
������������
������������������������������������
�����������������������������������������������������
��������������������������
��������������������������������
�����������������������
������������������������������������������������������������������������������������ �������������������������������������
�����������������������
��������
�����������������������������������������
������������������������������������
���������������������������
�������������������������������
������������������������������������
���������������������
����������
����������
��������
�����������
��������
�������������
��������
������������������������
������������������
��������������
��������������������������
������������������������������������������������������������������������������� DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

BORING LOG EXPLANATION SHEET

BORING LOG

20 -
!BORING lOG IEXPlANAl!ON S~IEIEl
Geotechnical & Environmental Sciences Consultants
F-38 Memorial Park Specific Plan
Soil Classification Chart Per ASTM D 2488
Primary Divisions
Secondary Divisions
Group Symbol Group Name

COARSE-

GRAINED
SOILS
more than
50% retained
on No. 200
sieve
GRAVEL
more than
50% of
coarse
fraction
retained on
No. 4 sieve

CLEAN GRAVEL
less than 5% fines
GW well-graded GRAVEL
GP poorly graded GRAVEL
GRAVEL with
DUAL

CLASSIFICATIONS
5% to 12% fines
GW-GM well-graded GRAVEL with silt
GP-GM poorly graded GRAVEL with silt
GW-GC well-graded GRAVEL with clay
GP-GC poorly graded GRAVEL with
GRAVEL with
FINES
more than
12% fines
GM silty GRAVEL
GC clayey GRAVEL
GC-GM silty, clayey GRAVEL
SAND
50% or more
of coarse
fraction
passes
No. 4 sieve

CLEAN SAND
less than 5% fines
SW well-graded SAND
SP poorly graded SAND
SAND with
DUAL

CLASSIFICATIONS
5% to 12% fines
SW-SM well-graded SAND with silt
SP-SM poorly graded SAND with silt
SW-SC well-graded SAND with clay
SP-SC poorly graded SAND with clay
SAND with FINES
more than
12% fines
SM silty SAND
SC clayey SAND
SC-SM silty, clayey SAND
FINE-

GRAINED
SOILS
50% or
more passes
No. 200 sieve
SILT and
CLAY
liquid limit
less than 50%

INORGANIC
CL lean CLAY

ML SILT
CL-ML silty CLAY

ORGANIC
OL (PI > 4) organic CLAY
OL (PI < 4) organic SILT
SILT and
CLAY
liquid limit
50% or more

INORGANIC
CH fat CLAY
MH elastic SILT

ORGANIC
OH (plots on or
above “A”-line) organic CLAY
OH (plots
below “A”-line) organic SILT
Highly Organic Soils PT Peat

USCS METHOD OF SOIL CLASSIFICATION
Apparent Density - Coarse-Grained Soil
Apparent
Density
Spooling Cable or Cathead Automatic Trip Hammer
SPT
(blows/foot)
Modified
Split Barrel
(blows/foot)
SPT
(blows/foot)
Modified
Split Barrel
(blows/foot)
Very Loose < 4 < 8 < 3 < 5
Loose 5 - 10 9 - 21 4 - 7 6 - 14
Medium
Dense 11 - 30 22 - 63 8 - 20 15 - 42
Dense 31 - 50 64 - 105 21 - 33 43 - 70
Very Dense > 50 > 105 > 33 > 70
Consistency - Fine-Grained Soil
Consis-
tency
Spooling Cable or Cathead Automatic Trip Hammer
SPT
(blows/foot)
Modified
Split Barrel
(blows/foot)
SPT
(blows/foot)
Modified
Split Barrel
(blows/foot)
Very Soft < 2 < 3 < 1 < 2
Soft 2 - 4 3 - 5 1 - 3 2 - 3
Firm 5 - 8 6 - 10 4 - 5 4 - 6
Stiff 9 - 15 11 - 20 6 - 10 7 - 13
Very Stiff 16 - 30 21 - 39 11 - 20 14 - 26
Hard > 30 > 39 > 20 > 26
LIQUID LIMIT (LL), %
PLASTICITY INDEX (PI), %
0 10
10 7
4 20
30 40
50 60
70 0
20 30 40 50 60 70 80 90 100
MH or OH
ML or OLCL - ML
Plasticity Chart
Grain Size
Description Sieve
Size Grain Size Approximate
Size
Boulders > 12” > 12” Larger than
basketball-sized
Cobbles 3 - 12” 3 - 12” Fist-sized to
basketball-sized
Gravel
Coarse 3/4 - 3” 3/4 - 3” Thumb-sized to
fist-sized
Fine #4 - 3/4” 0.19 - 0.75” Pea-sized to
thumb-sized
Sand
Coarse #10 - #4 0.079 - 0.19” Rock-salt-sized to
pea-sized
Medium #40 - #10 0.017 - 0.079” Sugar-sized to
rock-salt-sized
Fine #200 - #40 0.0029 -

0.017”
Flour-sized to
sugar-sized
Fines Passing
#200 < 0.0029” Flour-sized and
smaller
CH or OH
CL or OL
-
V
V /
V / ./
I/ I/,
V V
V .....-r
'/ /
Geotechnlcal & Environmental Sciences Consultants
Appendix F Geotechnical Evaluation F-39
0 5
10 15
20 20
53 67
50/6"
50/3"

7.1 114.0
GC
SC
ALLUVIUM:

Dark brown, wet, loose, clayey GRAVEL. Gravel up to 2.5 inches in diameter, subangular.

Medium dense, moist.

Dense.

Light brown, dry, very dense, clayey SAND.

Gray, very dense.

Total Depth: 15 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 1

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DATE DRILLED 9/19/22 BORING NO. B-1
GROUND ELEVATION 265' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 lbs (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH

DESCRIPTION/INTERPRETATION
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-40 Memorial Park Specific Plan
0 5
10 15
20 GC Brown, dry, dense, clayey GRAVEL with sand.

Total Depth: 1.5 feet stopped on refusal.

Backfilled with soil shortly after boring on 8/24/2022.

Notes: Groundwater was not encountered in boring at time of augering. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents(Google, 2022).

FIGURE A- 2

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 8/24/2022 BORING NO. B-1a
GROUND ELEVATION 265' (MSL) SHEET 1 OF
METHOD OF DRILLING Hand Auger

DRIVE WEIGHT DROP

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-41
0 5
10 15
20 37
30 34
75 6.7 110.4
GW-GC ALLUVIUM:

Brown, moist, medium dense, well-graded GRAVEL with clay and sand. Gravel up to 0.5" in diameter, subrounded.

Dense.

Total Depth: 11.5 feet stopped at planned depth.

Backfilled with soil and cement immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 3

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/2022 BORING NO. B-2
GROUND ELEVATION 270' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 INCHES

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-42 Memorial Park Specific Plan
0 5
10 15
20 35
59 11.0 116.1
CL
GP
ALLUVIUM:

Dark brown, moist, very stiff, gravelly LEAN CLAY with trace sand.

Brown, dry, medium dense, poorly graded GRAVEL with sand and clay.

Total Depth: 6.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 4

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/2022 BORING NO. B-3
GROUND ELEVATION 276' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-43
0 5
10 15
20 CL Brown, dry to moist, firm, sandy CLAY with gravel. Gravel up to 2" in diameter, subangular.

Very hard.

Total Depth: 1.7 feet stopped on refusal.

Backfilled with soil shortly after boring on 8/24/2022.

Notes: Groundwater was not encountered in boring at time of augering. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 5

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 8/24/2022 BORING NO. B-3a
GROUND ELEVATION 276' (MSL) SHEET 1 OF
METHOD OF DRILLING Hand Auger

DRIVE WEIGHT DROP

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-44 Memorial Park Specific Plan
0 5
10 15
20 32
64 41
72 14.4 119.7
GC
CL
GC
ALLUVIUM:

Brown, moist, medium dense, clayey GRAVEL with sand.

Dense.

Brown, moist, hard, LEAN CLAY with gravel.

Brown, moist, dense, clayey GRAVEL with SAND.

Total Depth: 11.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 6

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19 BORING NO. B-4
GROUND ELEVATION 277' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-45
0 5
10 15
20 27
37 7.3 115.3
GC ALLUVIUM:

Dark browm, moist, medium dense, clayey GRAVEL with sand.

Total Depth: 6.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 7

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/2022 BORING NO. B-5
GROUND ELEVATION 273' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-46 Memorial Park Specific Plan
0 5
10 15
20 36
22 10.9 119.2
GC ALLUVIUM:

Dark brown, moist, medium dense, clayey GRAVEL with sand.

Total Depth: 6.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 8

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-6
GROUND ELEVATION 280' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 404269001 | 11/22
-
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-47
0 5
10 15
20 GC Brown, dry to moist, dense to very dense, clayey GRAVEL with sand.

Total Depth: 1.2 feet stopped on refusal.

Backfilled with soil shortly after boring on 8/24/2022.

Notes: Groundwater was not encountered in boring at time of augering. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents(Google, 2022).

FIGURE A- 9

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/2022
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 8/24/2022 BORING NO. B-6a
GROUND ELEVATION 280' (MSL) SHEET 1 OF
METHOD OF DRILLING Hand Auger

DRIVE WEIGHT DROP

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-48 Memorial Park Specific Plan
0 5
10 15
20 75
46 88
73 11.4 125.3
CL-ML
GC
GP
ALLUVIUM:

Reddidh brown, moist, hard, silty CLAY with trace sand and gravel.

Brown.

Brown, moist, very dense, clayey GRAVEL with sand.

Brown, moist, very dense, GRAVEL with sand and gravel.

Total Depth: 10.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 10

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-7
GROUND ELEVATION 272' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-49
0 5
10 15
20 70
72 4.2 113.1
GP ALLUVIUM:

Brown, dry, dense, poorly graded GRAVEL with clay and sand.

Total Depth: 6.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 11

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-8
GROUND ELEVATION 278' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
... , .... . :
-
F-50 Memorial Park Specific Plan
0 5
10 15
20 23
76 78
88 86

3.7 106.0
GP
SC
ALLUVIUM:

Brown, moist, medium dense, poorly graded GRAVEL with sand. Gravel up to 1/ 2" inches, subrounded. Fine- to medium-grained sand.

Dry.

Very dense, cobbles.

Brown, moist, very dense, clayey SAND.

Total Depth: 15 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 12

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-9
GROUND ELEVATION 277' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-51
0 5
10 15
20 70
65 82
80 100

5.1 3.9
124.2
113.4
GP ALLUVIUM:

Brown, moist, dense, poorly graded GRAVEL with clay and sand. Clast supported.

Increasing sand content. Very dense.

Total Depth: 15 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 13

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-10
GROUND ELEVATION 286' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
.... , .. -~--·
... . . . .
:~: ..
-
F-52 Memorial Park Specific Plan
0 5
10 15
20 GC Brown, dry, dense, clayey GRAVEL with sand.

Total Depth: 1.0 feet stopped on refusal.

Backfilled with soil shortly after boring on 8/24/2022.

Notes: Groundwater was not encountered in boring at time of augering. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents(Google, 2022).

FIGURE A- 14

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 8/24/2022 BORING NO. B-10a
GROUND ELEVATION 286' (MSL) SHEET 1 OF
METHOD OF DRILLING Hand Auger

DRIVE WEIGHT DROP

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-53
0 5
10 15
20 55
38 81
64 4.0 112.3
GC ALLUVIUM:

Dark brown, moist, medium dense, clayey GRAVEL with sand.

Brown, moist, medium dense, GRAVEL with sand and clay
Dense. Rock.

Total Depth: 11.5 feet stopped at planned depth.

Backfilled with soil immediately after boring on 9/19/2022.

Notes: Groundwater was not encountered in boring at time of borings. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents (Google, 2022).

FIGURE A- 15

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 9/19/22 BORING NO. B-11
GROUND ELEVATION 286' (MSL) SHEET 1 OF

METHOD OF DRILLING HOLLOW STEM AUGER
DRIVE WEIGHT 140 LBS (SPOOLING CABLE) DROP 30 IN

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1eeflnlcal l Envtronmantal Scl,ncea Coosul~t,
F-54 Memorial Park Specific Plan
0 5
10 15
20 CL Brown, dry to moist, firm to stiff, sandy lean CLAY with gravel.

Total Depth: 1.3 feet stopped on refusal.

Backfilled with soil shortly after boring on 8/24/2022.

Notes: Groundwater was not encountered in boring at time of augering. It may rise higher due to relatively slow rate of seepage in clay and several other factors, as discussed in the report. Ground elevation shown above is an estimation only. It is based on our interpretation of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing constuction bids and design documents(Google, 2022).

FIGURE A- 16

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
DEPTH (feet)
Bulk SAMPLESDriven

BLOWS/FOOT
MOISTURE (%)

DRY DENSITY (PCF)
SYMBOL

CLASSIFICATION
U.S.C.S.

DESCRIPTION/INTERPRETATION
DATE DRILLED 8/24/2022 BORING NO. B-11a
GROUND ELEVATION 286' (MSL) SHEET 1 OF
METHOD OF DRILLING Hand Auger

DRIVE WEIGHT DROP

SAMPLED BY CDS LOGGED BY CDS REVIEWED BY RH
1 -
Gae>1ecf1nlcal l Envtronmantal Scl,ncea Consult.it,
Appendix F Geotechnical Evaluation F-55
Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

3. Description

3. Description

APPENDIX B
Laboratory Testing
-
F-56 Memorial Park Specific Plan

Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

APPENDIX B

LABORATORY TESTING
Classification
Soils were visually and texturally classified in accordance with the Unified Soil Classification System (USCS) in accordance with ASTM D 2488. Soil classifications are indicated on the logs of the exploratory borings in Appendix A.

In-Place Moisture and Density
The moisture content and dry density of relatively undisturbed samples obtained from the exploratory borings were evaluated in accordance with ASTM D 2937. The test results are presented on the logs of the exploratory borings in Appendix A.

Gradation Analysis
Gradation analysis tests were performed on selected representative soil samples in accordance with ASTM D 422. The grain-size distribution curves are shown on Figures B-1 through B-4. These test results were utilized in evaluating the soil classifications in accordance with the USCS.

Atterberg Limits
Tests were performed on selected representative fine-grained soil samples to evaluate the liquid limit, plastic limit, and plasticity index in accordance with ASTM D 4318. These test results were utilized to evaluate the soil classification in accordance with the USCS. The test results and classifications are shown on Figure B-5.

Expansion Index
The expansion index of a selected material was evaluated in accordance with ASTM D 4829. The specimen was molded under a specified compactive energy at approximately 50 percent saturation (plus or minus 1 percent). The prepared 1 inch thick by 4 inch diameter specimen was loaded with a surcharge of 144 pounds per square foot and inundated with tap water. Readings of volumetric swell were made for a period of 24 hours. The test results are presented on Figure B-6.

-
Appendix F Geotechnical Evaluation F-57
Coarse
3" 2" 1-1/2" 1" 3/4" 3/8" 4 10 30 50 200 PERFORMED IN ACCORDANCE WITH ASTM D 422 / D6913 Group Name: Clayey SAND Soak Time: 2.0 % Gravel
% Sand
% Fines
13 FINES
Fine
Passing
No. 200
(percent)

CLAYSILT
-- -- 13 SC
Medium
14 73

GRAVEL SAND
FineCoarse
16 100
-- --
Sample
Location
Depth
(ft)
Liquid
Limit
Plastic
Limit
 B-1 10.0-10.5 -- -- 0.72
404269001 | 11/22

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
Plasticity
Index USCS

0.23 D10 D30 D60 Cu CcSymbol
FIGURE B-1

GRADATION TEST RESULTS
0 10
20 30
40 50
60 70
80 90
100

0.00010.0010.010.1110100

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE NUMBERS HYDROMETER
-
I
------~
I I
I I I
I I I
ii
I I
""i',
I I
I I
I I
', I I
"'1
I
!I
I
I
'I
i ~
I
ii '
~
I
\ I ! ~,
!
\ I
I
I\
I
I
I l!I I I
I I
I\
I
I I I ~,
ii
I I
I I I
I I
\l
I
I I I
I I --..... I
I I I
I
ii
I
I I ~, I I
I I I
I I I
I Ill I I
11111
Geotethnical & Environmental Sciences Consultants
F-58 Memorial Park Specific Plan
Coarse
3" 2" 1-1/2" 1" 3/4" 3/8" 4 10 30 50 200 PERFORMED IN ACCORDANCE WITH ASTM D 422 / D6913 Group Name: Well-graded GRAVEL with clay and sand Soak Time: 2.0 % Gravel
% Sand
% Fines

GRAVEL SAND FINES
Coarse Fine Medium Fine SILT CLAY
16 100
Symbol Sample
Location
Depth
(ft)
Liquid
Limit
Plastic
Limit
Plasticity
Index USCS
 B-2 10.0-10.5 -- -- -- 0.13 1.10
D10 D30 D60 Cu Cc
Passing
No. 200
(percent)
404269001 | 11/22

8.04 62.1 1.2 7 GW-GC
FIGURE B-2
49 44
7 GRADATION TEST RESULTS

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
0 10
20 30
40 50
60 70
80 90
100

0.00010.0010.010.1110100

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE NUMBERS HYDROMETER
-
i\ I I
: ~ :

I
I
!\!
I
I
I
I
1\
I
I
I
I
\
i
I ~
'
I
i\11. I ! ~,
!
I
I', I
I
"
I
I
N
I
I ~,
I I
I I
~~,__ I I
I I 1--,...___ I I
I I
N I I ~,
~ I I
I I
I I
11111
Geotechnical & Environmental Sciences Consultants
Appendix F Geotechnical Evaluation F-59
Coarse
3" 2" 1-1/2" 1" 3/4" 3/8" 4 10 30 50 200 PERFORMED IN ACCORDANCE WITH ASTM D 422 / D6913 Group Name: Clayey GRAVEL with sand Soak Time: 2.0 % Gravel
% Sand
% Fines

GRAVEL SAND FINES
Coarse Fine Medium Fine SILT CLAY
16 100
Symbol Sample
Location
Depth
(ft)
Liquid
Limit
Plastic
Limit
Plasticity
Index USCS
 B-5 6.0-6.5 -- -- -- -- 0.45
D10 D30 D60 Cu Cc
Passing
No. 200
(percent)
404269001 | 11/22

6.86 -- -- 15 GC
FIGURE B-3
44 41
15 GRADATION TEST RESULTS

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
0 10
20 30
40 50
60 70
80 90
100

0.00010.0010.010.1110100

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE NUMBERS HYDROMETER
-
\i
I I I
I I I
I Ill I I
I I
ii
I
·~
I I
I
:

I
I I
'l's
i
I
~
I
!I
I
I
"~ ~ i
I
ii ~r---. '
I
I ! ~,
" "!
I
I
I
I
I l!I ~ I
I I ~I'- I
I I I ~,
ii
I
i"ii'---
I
I I I
I I I
I I ..... I
I I :'-,. I
I I
I
ii
I
I I I ~, I I
I I I
I I I
I Il l I I
11111
Geotechnlcal & Environmental Sciences Consultants
F-60 Memorial Park Specific Plan
Coarse
3" 2" 1-1/2" 1" 3/4" 3/8" 4 10 30 50 200 PERFORMED IN ACCORDANCE WITH ASTM D 422 / D6913 Group Name: Clayey SAND Soak Time: 2.0 % Gravel
% Sand
% Fines

GRAVEL SAND FINES
Coarse Fine Medium Fine SILT CLAY
16 100
Symbol Sample
Location
Depth
(ft)
Liquid
Limit
Plastic
Limit
Plasticity
Index USCS
 B-9 10.5-11.0 -- -- -- -- 0.09
D10 D30 D60 Cu Cc
Passing
No. 200
(percent)
404269001 | 11/22

0.57 -- -- 28 SC
FIGURE B-4
13 59
28 GRADATION TEST RESULTS

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
0 10
20 30
40 50
60 70
80 90
100

0.00010.0010.010.1110100

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE NUMBERS HYDROMETER
-
I .....___ I I
I I I
I I I
~I',.

I
I
I
I
I
"'N
f
I
' r---1\ I
I ! ~,
! '\
I
I
I
1'. I
I I
~
I I
I I
~,
~ I I
I I
I I
I I
I I
I I
I I ~,
I I
I I
I I
11111
Geotechnical & Environmental Sciences Consultants
Appendix F Geotechnical Evaluation F-61
404269001 - Cupertino - Master Labs CDS

PERFORMED IN ACCORDANCE WITH ASTM D 4318
FIGURE B-5

ATTERBERG LIMITS TEST RESULTS
SYMBOL LOCATION DEPTH (ft) LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX
USCS

USCSCLASSIFICATION
(Fraction Finer Than
No. 40 Sieve)
CL-MLB-7 3.5-4.0 19 15 4 CL-ML
404269001 | 11/22

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
CH or OH
CL or OL MH or OH
ML or OLCL - ML
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 100

PLASTICITY INDEX, PI

LIQUID LIMIT, LL
-
/ V
/ / V
/ /
/
/ ~
/
/ / V
,, , ,, ,,
I/ I
Geotechnical & Environmental Sciences Consultants
F-62 Memorial Park Specific Plan
PERFORMED IN ACCORDANCE WITH ASTM D 4829
FIGURE B-6

EXPANSION INDEX TEST RESULTS

CUPERTINO MEMORIAL PARK
21121 STEVENS BLVD, CUPERTINO, CA
404269001 | 11/22
B-11a 0.0-1.3 11.9 102.5 23.1 0.025 25 Low
B-7 2.5-3.0 8.9 114.2 15.2 0.008 8 Very Low
B-3 2.5-3.0 9.4 111.8 17.9 0.006 6 Very Low
SAMPLE

LOCATION
SAMPLE
DEPTH (ft)

INITIAL

MOISTURE
(percent)

COMPACTED DRY
DENSITY (pcf)
FINAL

MOISTURE
(percent)

VOLUMETRIC
SWELL (in)

EXPANSION
INDEX

POTENTIAL

EXPANSION
-
Geotechnical & Environmental Sciences Consultants
Appendix F Geotechnical Evaluation F-63
Ninyo & Moore | 21121 Stevens Creek Boulevard, Cupertino, California | 404269001 | November 3, 2022

APPENDIX C
Corrosivity Testing (CERCO Analytical)
-
F-64 Memorial Park Specific Plan
-
7 September, 2022
Ms. Tatiana Gospe
Ninyo & Moore
2149 O'Toole Avenue, Suite 30
San Jose, CA 95131
Subject: Project No.: 404269001
Job No. 2208054
Cust. No.13270
CERCO
analytical
1100 Willow Pass Court, Suite A
Concord, CA 94520-1006
925 462 2771 Fax. 925 462 2775
www.cercoanalytical.com
Project Name: Memorial Park, 21121 Stevens Creek Blvd., Cupertino, CA Corrosivity Analysis - ASTM Test Methods
Dear Ms. Gospe:

Pursuant to your request, CERCO Analytical has analyzed the soil sample submitted on August 29, 2022.

Based on the analytical results, this brief corrosivity evaluation is enclosed for your consideration.

Based upon the resistivity measurement, this sample is classified as "corrosive". All buried iron, steel, cast iron, ductile iron, galvanized steel and dielectric coated steel or iron should be properly protected against corrosion depending upon the critical nature of the structure. All buried metallic pressure piping such as ductile iron firewater pipelines should be protected against corrosion.

The chloride ion concentration is 78 mg/kg and is determined to be insufficient to attack steel embedded in a concrete mo1iar coating.

The sulfate ion concentration is 49 mg/kg and is determined to be insufficient to damage reinforced concrete structures and cement mortar-coated steel at this location.

The pH of the soil is 7.32, which docs not present corrosion problems for buried iron, steel, mortar-coated steel and reinforced concrete structures.

The red ox potential is 200-m V and is indicative of potentially "moderately corrosive" soils resulting from anaerobic soil conditions.

This corrosivity evaluation is based on general corrosion engineering standards and is non-specific in nature. For specific long-term corrosion control design recommendations or consultation, please call JDH Corrosion Consultants, Inc. at (925) 927-6630.

We appreciate the oppottunity of working with you on this project. If you have any questions, or if you require fmther information, please do not hesitate to contact us.

Very truly yours,
CERCO ANALYTICAL, INC.
~~-
J. Darby Howard, Jr., P.E.

President
JDH/jdl
Enclosure
Appendix F Geotechnical Evaluation F-65
Client:

Client's Project No.:

Ninyo & Moore
404269001
Client's Project Name: Memorial Park, 21121 Stevens Creek Blvd., Cupertino, CA Date Sampled: 24-Aug-22
Date Received:

Matrix:

Authorization:

Job/Sample No
2208054--001
Method:

Reporting Limit:

Date Analyzed:

Sherri Moore
Chemist
29-Aug-22
Soil
Signed Chain of Custody
Sample I D
B-6/0.0-1.2'
Redox
(mV)
200
ASTMD1498
-
2-Sep-2022
pH

7.32 ASTM D4972
-
2-Sep-2022
Conductivity
(umhos/cm)*
-
ASTMD 1125M
IO
-
• Results Reported on ~ As Received" Basis
N.D. - None Detected
Qualitv Contr ol Summarv -- AIHabo ratoryq uality contro l param eters were found to be within established limits Resistivity
(I 00% Saturation)
(ohms-cm)
1,800
ASTMG57
-
2-Sep-2022
Sulfide
(mg/kg)*
-
ASTMD4658M
50 -
-
-~n~l~tfc?i
1100 Willow Pass Court, Suite A
Concord, CA 94520-1006
925 462 277 1 Fax. 925 462 2775
www.cercoanalytical.com
Date of Report:

Chloride
(mg/kg)*
78 ASTMD4327
15 2-Sep-2022
7-Sep-2022
Sulfate
(mg/kg)*
49 ASTMD4327
15 2-Sep-2022
Page No. 1
F-66 Memorial Park Specific Plan
-
Chain of Custody
11 Job No. CU# Client Project I.D.
404269001 l~I I
Full Name Phone 4084359000 X 15319
Tatiana Gospe Fax
Company and/or Mailing Add ress Cell
Ninyo & Moore 2149 O'Toole Avenue Suite 30 San Jose CA [8J .; "fi Sample Source 0

0..

Memorial Park, 21121 Stevens Cree k Boulevard, Cupertino, CA ~ .g
Lab No. Sample 1.D. 1 Date Time Matrix Contain. Size Preserv. Qtv. ~ B-6/0.0 -1.2' ~h--rl ;J)/1 s
I I. ! .
i
I
!
!
l
! i
i
I
I i
I i
Schedule I
Anal•~.I II

MALYSIS
~
g
.£'-o .g
-~ ~ .!l ·5 ,la:
! j ~ ;; :;:;
"' u

X X X X X
I
'
I
' i
'
'
I
'
1100WlllowPassCourt •
Concord, CA 94520-1006
925 4622771 CERCO
Fax: 92S 462 2775 ~ 9. a n a l ytical
ii Date Sarrpled
I
Date Due
II 8/24/22
ASTM
C
0 ~
~
.;
>
i <ii
X
i
I
'
'
i I
I
.

I DW - Drinking Water
I
"' HB -Hosebib
I § CJ Relinquish ed By :

I
2 T otlill No. of Cont ainers
~
d Date 8/26/22 Time GW - Ground Water 0 PV - Petcock Va1ve 12:30 SW - Surface Water 1': PT- Pressure Tank "
Rec'd Good Cond/Cold D ,
'w'W - Waste Water < PH - Pump House
la
D
Received By:
~ UJj I} ~!i L'tfte f;,j1 /J4 / Tim e .J_
I
> " Conforms to Record Water RR -Restroom '"' 11 :J.._ "'1-- IO o I
"' ..,
=i
SL. Sludge
'" GL- Glass ~ Temp. 2 t Lab -•c
(/ I)
I ' "' Relinquish ed By : Date Tim e S • Soil
"' PL-Plasti c iii Sampler I Product -< ST - Sterile
Comment s:

Rece ived By: Date Time THERE IS ~'i ADDITIO NAL C!L<\RGE FOR EXTRUDING SOIL FROM METAL TUBES Relinquish ed By : Date Tim e Email Addasms tgospe@ninyo andmoore.com Receive d By: Date Time Appendix F Geotechnical Evaluation F-67

2149 O’Toole Avenue, Suite 30 | San Jose, California 95131 | p. 408.435.9000 ARIZONA | CALIFORNIA | COLORADO | NEVADA | TEXAS | UTAH ninyoandmoore.com

-
Geotechnlc:il & Enviro11m0n~I Scil!mcH Con-sullanls
This Page
Intentionally
Left Blank
Memorial Park Specific Plan G-1
Planning Context
Appendix G
-
This Page
Intentionally
Left Blank
Appendix C Planning Context G-3
Planning Context
The Memorial Park Specific Plan is a forward-looking
document that aims to preserve the current character
of the park while also providing new active and
passive recreational opportunities for residents and
visitors. Multiple City-wide planning efforts apply
to Memorial Park and have guided its vision to be a
place that embraces Cupertino’s diverse community.
•
City of Cupertino General P
lan (2014)
•
Heart of the City Specific P
lan (2014)
•
ADA Self-Ev
aluation and Transition Plan (2015)
•
Bicycle Transportation P
lan (2016)
•
P
edestrian Transportation Plan (2018)
•
Green Storm W
ater Infrastructure Plan (2019)
•
P
arks and Recreation System Master Plan (2020)
•
Climate
Action Plan 2.0 (2022)
City of Cupertino General Plan (2014)
The City adopted the 2015-2040 General Plan in
2014 with the aspiration to have a vibrant, mixed-
use “Heart of the City” with exemplary parks
and accessible open space areas. The General Plan
presents the City’s vision to be safe, friendly, healthy, connected, walkable, bike-able, and inclusive for all
residents and workers.

The General Plan follows 12 guiding principles to
attain Cupertino’s desired future.
•
Dev
elop cohesive neighborhoods: Ensure that
all neighborhoods are safe, attractive and include
convenient pedestrian and bicycle access to a “full-
service” of local amenities such as parks, schools,
community activity centers, trails, bicycle paths ,
and shopping.
•
Improv
e public health and safety: Promote public
health by increasing community-wide access to
healthy foods; ensure an adequate amount of
safe, well-designed parks, open space, trails, and
pathways; and improve safety by ensuring all
areas of the community are protected from natural
hazards and fully served by disaster planning
and neighborhood watch programs, police, fire,
paramedic, and health services.
•
Improv
e connectivity: Create a well-connected
and safe system of trails, pedestrian and bicycle
paths, sidewalks and streets with traffic calming
measures that weave the community together,
enhance neighborhood pride and identity, and
create access to interesting routes to different
destinations.
•
Enhance mobility:

Ensure the efficient and safe
movement of cars, trucks, transit, pedestrians,
bicyclists, and disabled persons throughout
Cupertino in order to fully accommodate
Cupertino’s residents, workers, visitors and
students of all ages and abilities. Streets, pedestrian paths, and bike paths should comprise an integrated
system of fully connected and interesting routes to
all destinations.
-
G-4 Memorial Park Specific Plan
•
Ensure
a balanced community: Offer residents
a full range of housing choices necessary
to accommodate the changing needs of a
demographically and economically diverse
population, while also providing a full range
of support uses including regional and local
shopping, education, employment, entertainment,
recreation, and daily needs that are within easy
walking distance.
•
Support vib
rant and mixed-use businesses:

Ensure that Cupertino’s major mixed-use corridors
and commercial nodes are vibrant, successful,
attractive, friendly, and comfortable with inviting
active pedestrian spaces and services that meet the
daily needs of residents and workers.
•
Ensure
attractive community design: Ensure
that buildings, landscapes, streets and parks are
attractively designed and well maintained so they
can complement the overall community fabric by
framing streets and offering a variety of active,
relaxing and intimate pedestrian spaces.
•
Embrace div
ersity: Celebrate Cupertino’s diversity
by offering a range of housing, shopping and
community programs that meet the needs of the
full spectrum of the community, while ensuring
equal opportunities for all residents and workers
regardless of age, cultural or physical differences.
•
Support
education: Preserve and support quality
community education by partnering with local
school districts, community colleges, libraries,
and other organizations to improve facilities
and programs that enhance learning and expand
community- wide access.
•
Preserv
e the environment: Preserve Cupertino’s
environment by enhancing or restoring creeks
and hillsides to their natural state, limiting urban
uses to existing urbanized areas, encouraging
environmental protection, promoting sustainable
design concepts, improving sustainable municipal
operations, adapting to climate change, conserving
energy resources, and minimizing waste.
•
Ensure
fiscal self-reliance: Maintain fiscal self-
reliance in order to protect the City’ s ability to
deliver essential, high-quality municipal services
and facilities to the community.
•
Ensure a responsiv
e government: Continue to
be a regional leader in accessible and transparent
municipal government; promote community
leadership and local partnerships with local
and regional agencies; and remain flexible and
responsive to changing community needs.

Memorial Park follows several of these principles
and supports the City’s mission in providing a safe
and inclusive space that is diverse, attractive, and
pedestrian friendly. The Land Use (LU), Mobility
(M), Environmental Resources and Sustainability
(ES), and Recreation, Parks, and Community Services
(RPC) Elements of the General Plan outline goals,
policies, and actions to guide the City of Cupertino in future park-related projects.

The General Plan called for a Parks and Recreation
System Master Plan, which was subsequently
adopted in 2020 and provides recommendations
specific to Memorial Park. The General Plan also
recommended pedestrian and bicycle improvements
on Stelling Road in order to enhance connections to
the park.

Figure G-1: General Plan Vision
-
Appendix C Planning Context G-5
Heart of the City Specific Plan (2014)
The Heart of the City Specific Plan acts as a guide
for future development and redevelopment projects
along Stevens Creek Boulevard to ensure Cupertino
embodies a greater sense of place and community
identity. The Specific Plan covers approximately 635
acres along 2.5 miles of Stevens Creek Boulevard,
including Memorial Park.

Being one of the most important corridors and streets
within the city, the goal of this plan is to develop a
collection of pedestrian-inclusive gathering spaces
along the boulevard that bring a sense of place and
community to residents and visitors alike. Included
in this plan are guidelines on streetscape, design
and development standards, design concepts,
related zoning ordinances, infrastructure and
implementation plans, and estimated costs of the
project.

Memorial Park falls into the West Stevens Creek
Boulevard area, of which the primary use is quasi-
public and public facilities that support mixed
commercial and residential uses. The planting theme
in this area is “Oak Grove.” It features an informal
arrangement of Live Oaks (Quercus agrifolia ) and
native wildflowers in curbside planting strips along
the frontage of Stevens Creek Boulevard.

Memorial Park and its immediate area are zoned
under the Heart of the City Specific Plan. The park
is a Park and Recreation (PR) zone and is mostly
surrounded by residential uses.

The park is adjacent to Multi-Family Residential (R-3)
zones to the west and Single-Family Residential (R-1)
zones to the north and northeast. To the far northeast
of the park is a Quasi-Public Building (BQ) zone that
contains a day care and child development center.

The neighborhood directly south of the Quinlan
Community Center is a Planned Development (P)
zone for residential uses only, which consists of
condominiums and townhouses. There are two
nearby Planned Development (P) zones that allow
for General Commercial (CG) and residential uses—
one of which is directly east of the Cupertino Sports
Center while the other is on the opposite site of Mary
Avenue along the southwest corner of the park. A
large Public Building (BA) zone borders the southern
edge of the park, which contains De Anza College
and Faria Elementary School.

Figure G-2: Cupertino Zoning
Memorial Park
0 rib. Or
s
!---l __ " __ __!B
R1-1CI
________ _,
-- -- -- --... I -••••• ...

I BQ "'
,
□
R3
-
P(CG)

P(CG, OA)
~ r--­•
YnS U P(CG. ML. RN •10)
: P(RHJ
I
•:--.r-1
r--------....1: !!...!-~ • • • .,~ ______ _pteYt:ns Cre ~ a vd .,
PfCG, RH)
R:1-tG
G-6 Memorial Park Specific Plan
ADA Self-Evaluation and Transition Plan
(2015)
The ADA Self-Evaluation and Transition Plan
identifies policy, program, and physical barriers
to accessibility to help develop barrier removal
solutions that improve access for all individuals. This self-evaluation report is an assessment of the City’s
current policies, practices, and procedures in relation to the American with Disabilities Act (ADA). The
report goes into further detail of each department’s
current accessibility and additional recommendations
to improve user experiences. A transition plan
then outlines a strategy to transition inaccessible
facilities into environments that are accessible to and functional for individuals with disabilities.

In terms of parks and recreation, it was recommended
to adjust policies relating to allowing service animals, regardless of disability, to be acceptable in all parks and City buildings. The plan also recommends
that more meetings and public events to be made
accessible in American Sign Language (ASL).

Additionally, recreation and community services
should provide accommodations for people upon
request, training for staff addressing services for
people with disabilities, transportation services for
camps and the Cupertino Senior Center, and more.

Bicycle Transportation Plan (2016)
The City adopted the Bicycle Transportation Plan in
2016 that identifies a prioritized list of projects that support and promote bicycling in Cupertino. The
vision statement of the plan is “the City of Cupertino
envisions an exceptional bicycling environment that
supports active living and healthy transportation
choices, provides for safer bicycling, and enables
people of all ages and abilities to access jobs, schools, recreation, shopping, and transit on a bicycle as a
part of daily life.” The plan has three stated goals:
•
Goal 1:

Increase awareness and value of bicycling
through encouragement, education, enforcement,
and evaluation programs.
•
Goal 2:

Improve bicyclist safety through the design
and maintenance of roadway improvements.
•
Goal 3:

Increase and improve bicycle access
to community destinations across the City of
Cupertino for all ages and abilities.

The plan recommends improvements to the extensive
bicycle network that will establish safe connections
to key destinations. The proposed bikeway projects
include bike paths, separated and buffered lanes,
boulevards, routes, and spot improvements.

The plan proposes multiple projects that relate to
Memorial Park, such as a Class IV separated bikeway
along both sides of North Stelling Road and Stevens
Creek Boulevard. The plan also proposed a Class
II buffered bike lane along Mary Avenue, which is
now complete, and a bike route through the park
that would connect Alves Drive to Mary Avenue as
part of a larger Class III bike route project. Lastly, the plan recommended spot improvements for safety in
the southeast corner of Quinlan Community Center
at the intersection of Alves Drive and North Stelling
Avenue.
-
Appendix C Planning Context G-7
Pedestrian Transportation Plan (2018)
The City adopted the Pedestrian Transportation Plan
in 2018 with the goal to create an inviting and safe
walkable environment that promotes active living and
healthy transportation choices, enhances the quality
of life for all community members and visitors, and
creates a seamless and integral connected, multi-
modal transportation network. The plan recommends
an integrated network of walking paths that provide
a wide range of access to various nodes of activity,
including parks. The following goals inspired the
recommendations and implementation strategy
incorporated into this plan:
•
Goal 1: Safety
– Improve pedestrian safety and
reduce the number and severity of pedestrian-
related collisions, injuries, and fatalities.
•
Goal
2: Access – Increase and improve pedestrian
access to community destinations across the City
of Cupertino for people of all ages and abilities.
•
Goal 3: Connectivity
– Continue to develop a
connected pedestrian network that fosters an
enjoyable walking experience.

The plan recommends a sidewalk buffer from the
State Route 85 northbound on-ramp to North Stelling
Road, which covers the park’s southern frontage. The
plan also recommends a shared-use path and bike/
pedestrian bridge over State Route 85 that would
improve pedestrian access to the park from the
west. Additional recommendations include adjusted
median curblines to provide a clear, accessible path
of travel for pedestrians across the intersection of
Stevens Creek Boulevard and Mary Avenue, as well
as a new high-visibility crosswalk on the west leg
of this intersection. Lastly, the plan identifies the
intersection of North Stelling Road and Alves Drive,
at the southeast corner of Quinlan Community
Center, as a priority project location for pedestrian
improvements. At the time of this document, these
recommendations and improvements have not been
realized.

Green Stormwater Infrastructure Plan (2019)
In 2019, the City produced and adopted a Green
Stormwater Infrastructure Plan (GSI) to commit to a
sustainable drainage system that is environmentally
efficient. The GSI guides the City in the identification, implementation, tracking, and reporting of green
stormwater infrastructure projects within its
jurisdiction and coordinated with the General Plan,
the Climate Action Plan, the Bicycle Transportation
Plan, the Pedestrian Transportation Plan, and other
specific and master plans to provide a pleasant urban
environment for residents, workers, and visitors.

Specific goals of the GSI are:
•
Goal 1:

Align the City’s goals, policies, and
implementation strategies for GSI with the General
Plan and other related planning documents
•
Goal 2:

Identify and prioritize GSI opportunities
throughout the City
•
Goal 3:

Establish targets for the extent of City area
to be addressed by GSI over certain timeframes
•
Goal 4:

Provide a workplan and legal and funding
mechanisms to implement prioritized projects
•
Goal 5:

Establish a process for tracking, mapping,
and reporting completed projects
The GSI identifies green stormwater infrastructure
opportunities on public parcels and street segments.

The GSI generally recommends that all parks
incorporate green stormwater infrastructure with
enhanced educational signage explaining the
function and purpose of the improvements. Nearby
portions of Stevens Creek Boulevard, Mary Avenue,
and North Stelling Road are designated as a street
segments with green stormwater infrastructure
opportunity.

Memorial Park was specifically identified as an
opportunity site to construct an infiltration basin to
treat runoff from Stevens Creek Boulevard.
-
G-8 Memorial Park Specific Plan
Parks and Recreation System Master Plan
(2020)
On February 18, 2020, the City adopted the Parks
and Recreation System Master Plan. This plan
provides a cohesive vision and strategy to guide
future development, renovation, management, and
programming of the City’s parks and recreation
facilities through the year 2040.

Between 2015 and 2018, more than an estimated 2,000
community members provided input and feedback
on the Master Plan. Various online and in-person
activities were held to invite residents, stakeholders, partners, businesses, elected officials, staff, youth,
and people of diverse cultural backgrounds to share
their aspirations for the parks and recreation system.

The planning process identified broad community
support to preserve and enhance recreation,
walkability, access to open spaces, and Cupertino’s
sense of place and quality of life.

The community preferences, priorities, and
expectations revealed 12 themes:
•
P
ark and Facility Access: Residents want
easy, enhanced access to parks and recreation
opportunities.
•
The
Arts: Cupertino should support the arts
by offering a diverse set of arts and culture
programming.
•
Uniquely
Cupertino: Parks and recreation
opportunities should reflect Cupertino’s character,
heritage and diverse community.
•
Cultural Div
ersity: Recreation facilities and
programs should celebrate Cupertino’s cultural
diversity.
•
Nature Experience:

Community members want
more opportunities to connect to nature.
•
P
artnerships: Strong partnerships can help create
unique and diverse parks and recreation programs.
•
Extraordinary P
lay: Cupertino desires a variety of
play experiences for all ages and abilities.
•
Recreation V
ariety: Residents and visitors desire a
wide range of recreation options.
•
Trail and Connectivity:

Residents value trails and
desire more opportunities for walking and biking
in Cupertino.
•
Social Gathering and Celebration:

Residents
appreciate community events and would like to
see more spaces in Cupertino for bringing people
together.
•
W
elcoming Places and Services: Residents expect
outstanding customer service and quality facilities
that are responsive to community needs.
•
Y
outh and Teen Empowerment: Special attention
is needed to engage and empower Cupertino
youth and teens.

Figure G-3: Parks and Recreation System Master
Plan Key Themes from Community Outreach

PARK & FACILITY
ACCESS

THE ARTS UNIQUELY

CUPERTINO

PARTNERSHIPS

TRAILS &

CONNECTIVITY

YOUTH & TEEN

EMPOWERMENT
NATURE

EXPERIENCE

RECREATION

VARIETY

WELCOMING

PLACES & SERVICES

CULTURAL

DIVERSITY

EXTRAORDINARY
PLAY

SOCIAL GATHERING
& CELEBRATION
-
.... : II ll
II ~ II
- - ~
, m o
Appendix C Planning Context G-9
The Parks and Recreation System Master Plan has
seven goals:
•
MP1.

Conservation: Protect nature, trees and
natural areas in parks and throughout the city
to support wildlife, ecological functions and
a stronger connection to Cupertino’s natural
environment.
•
MP2. Connection: Provide
an interconnected
network of multiuse trails, walkways and
bikeways, close-to-home parks, and community
destinations.
•
MP3.

Equitable Access: Distribute parks and
facilities throughout the community for easy and
equitable access.
•
MP4.

Enhancement: Reinvigorate and revitalize
parks and recreation facilities to support broad
and inclusive recreation interests.
•
MP5.

Activity: Provide programs, events and
services that foster social cohesiveness and lively,
diverse activities for people of all ages, abilities,
cultures, and interests.
•
MP6. Quality:

Create high quality recreation
experiences, places and services that are
welcoming, safe, responsive, comfortable and
reflective of Cupertino’s unique character.
•
MP7. Sustainability:

Provide, manage and
maintain parks, facilities, programs and services
through sound management and stewardship,
sustainable choices and the wise use of resources.

Memorial Park was identified as an ideal location for
several general improvements proposed in the plan,
including expanded senior services as well as nature
play and all-inclusive play opportunities.

There are specific recommendations in the Parks and
Recreation System Master Plan for Memorial Park.

Recommendations include improvements to facilities
and infrastructure to accommodate community-
wide civic or social events and festivals, additional
recreation space for older adults, maintaining the
lighted softball field, repurposing the inactive ponds, developing at least two dual-striped pickleball
courts, and enhancing natural vegetation. Actions
identified for the short term were improvements
specifically to the ponds and amphitheater, as well
as the enhancement of pathways, seating, shade,
and accessibility elements. The overall vision for
Memorial Park included an expansion of the civic
event space and enhancement of the natural site
features, as well as a focus on integrating the park
with the surrounding City facilities.

The Parks and Recreation System Master Plan called
for a site master plan and initial site improvements
for Memorial Park as an immediate opportunity that
supports the Enhancement, Activity, and Quality
goals. The Memorial Park Specific Plan fulfills this
recommendation.

Parks and Recreation System Master Plan Vision
“We aspire to create an inspiring, lively, healthy, diverse and sustainable community by connecting our residents
to outstanding parks, nature and one another.”
-
G-10 Memorial Park Specific Plan
Climate Action Plan (2022)
The Climate Action Plan 2.0 (CAP) updated the
previous 2015 CAP. The CAP 2.0 intends to improve
the wellbeing of the community by developing a
summary of existing and projected greenhouse gas
(GHG) emission levels, establishing GHG emissions
targets, and committing to GHG reduction and
climate adaptation measures. The guiding principles
of the CAP 2.0 are equity, innovation, urgency and
flexibility, and resilience and adaptation.

The City’s goal is to achieve carbon neutrality by
2040. The climate adaptation measures presented
in the CAP 2.0 are a suite of actions to achieve
this goal which were designed in consideration of
partnerships, equity, financing, structural change,
and engagement. In addition to reducing GHG
emissions, the climate adaptation measures are
intended to help the City adapt to impacts of climate
change that may be unavoidable.

Specific actions in the CAP 2.0 are studying
opportunities for carbon sequestration, providing
ecologically-responsible recreation opportunities
in parks, and improving public transit and micro-
mobility infrastructure while reducing vehicle
parking where feasible.
-
Memorial Park Specific Plan H-1
Site Assessment
Appendix H
-
This Page
Intentionally
Left Blank
Appendix H Site Assessment H-3
1 Amphitheater
2a Picnic (Drop-in)
2b Picnic (Reservable)
3 Multi-Use Lawn
4a Playground (2-5)
4b Playground (5-12)
5 Softball Field
6 Tennis Courts
7 Spectator Seating
8 Restrooms
9 Maintenance/Storage
10 Cell Tower
32b
4a
4b
69 7
5 9
9 10
32a
2a
2a
3 1
8 3
3 7
8 Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Cupertino
Senior Center
Quinlan
Community
Center
100’ 0 200’
Figure H-1: Existing Amenities
0 0
0 0
\
\
0 0
0 0
0 I
I
-- - -- - __ .J
0 0
0 0
-
H-4 Memorial Park Specific Plan
Existing Amenities
Memorial Park is a heavily utilized and amenitized
park (Figure H-1). There are two community facilities
at opposite ends of the site, an amphitheater, picnic
areas, multi-use lawn spaces, playgrounds, a softball
field, tennis courts, and other amenities to support
the function of the park.

Quinlan Community Center
The Quinlan Community Center is a 27,000-square-
foot recreation facility located in the southeastern
portion of Memorial Park. The Quinlan Community
Center, opened in 1990, is home to the City’s Parks
and Recreation Department and the Cupertino
Historical Society and Museum. The facility is named
after Robert W. Quinlan, Cupertino’s second City
Manager who served from 1971 to 1989. The building
is multi-use, offering classrooms and a variety of
other rooms available to rent for business or personal
needs. This includes a banquet room, known as the
Cupertino Room, that features a full catering kitchen
and attached patio that can accommodate over 200
guests. The Quinlan Community Center also hosts
classes for preschool, crafting, and dance and has a
small shaded play area attached to a rentable room in
the northern wing.

The Quinlan Community Center hosts the annual
Community Tree Lighting in December. This
indoor/outdoor event utilizes the building’s lobby,
courtyard, and adjacent event lawn for local choir
performances, a food pantry collection, photos with
Santa, craft tables, and the lighting ceremony.

The Quinlan courtyard on the western side of the
building was dedicated on August 17, 2010. It features
a small shade structure that is bracketed by the
wings of the building. The Quinlan event lawn lies
immediately west of the courtyard. The courtyard
is well-connected with the park’s pathway network,
with walkways from both the north and south ends
of the courtyard wrapping around the Quinlan event
lawn leading into the park. The lobby can be accessed
from both the western and eastern entrances and is
open from 8:00 am to 5:00 pm on weekdays.

Image H-1: Quinlan Community Center, Street Frontage
Image H-2: Quinlan Community Center, Courtyard
Image H-3: Quinlan Community Center, Cupertino Room
-
Appendix H Site Assessment H-5
Cupertino Senior Center
The Cupertino Senior Center, a membership-based
recreation facility, is a 15,500-square-foot building
located in the southern portion of Memorial Park
along Stevens Creek Boulevard. It was originally
built in the early 1980s but was replaced around the
year 2000. The Cupertino Senior Center strives to
provide a welcoming and friendly environment for
adults over 50 years old, promoting a healthy lifestyle through quality education, recreation, travel, social,
and volunteer opportunities.

The main entrance to the building is on the north side, served by a parking lot accessed via Mary Avenue.

The main entrance features a memorial bench
and low seat wall with engraved tile dedications
bordering a paved plaza with shaded circular picnic
tables and a decorative pergola. There is a small deck
facing the park on the east side of the building that is undersized for its current usage.

The Cupertino Senior Center is not well connected to
Memorial Park in terms of pedestrian circulation and
programmed uses. There is a grade change from the
back of the building into the park that does not have
an accessible or direct pedestrian connection to the
existing internal pathway network.

Amphitheater
Memorial Park is home to the only public
amphitheater in Cupertino. It hosts the Summer
Concert Series and Shakespeare in the Park,
which both run during the summer months. The
amphitheater is highly valued by the community.

Terraced concrete seat walls are built into a small
hillside area to provide formal seating. The seat walls are surrounded by lawn and are backed by a grove
of trees. There are no ramps, stairs, or handrails and
therefore limited accessibility.

The previous Ponds Repurposing Project removed
the pond area between the stage and the pedestrian
path in front of the seating area. The park’s main
pathway runs between the stage and the seating
area, but the recent City-funded Amphitheater
Improvement Project added an alternative pathway
behind the seating area to detour pedestrians during
a performance.

Image H-4: Cupertino Senior Center, Park Frontage
Image H-5: Amphitheater Seating
Image H-6: Cupertino Senior Center, Street Frontage
-
H-6 Memorial Park Specific Plan
Picnic Areas
In addition to large festivals and events, Memorial
Park offers spaces for smaller gatherings, such as
birthday parties, lunch meetups, and play dates.

The park has multiple picnic areas for drop-in use,
as well as a large reservable picnic area, which
accommodates social gatherings of all sizes. These
areas are largely without shade, which inhibit their
use on hot and sunny days.

The reservable picnic area is located west of the
Quinlan event lawn on a slightly raised platform
area. This picnic area has a capacity of 113 people
with 16 picnic tables, 2 serving tables, 3 barbeques,
and a counter area with a sink. Trees surround the
area but there is minimal shade directly over the
space. Electricity is available with a reservation to
further enhance the usability of this key amenity.

There are two smaller general use picnic areas around
the softball outfield, each with two picnic tables and
two barbeques.

Lastly, there is a large general use picnic area near
the 5-12 year old playground with space for multiple
groups and barbeques. However, there is a lack
of separation between the tables to create clear
groupings.

Image H-7: Reservable Picnic Area
Image H-8: Picnic Area near 5-12 PlaygroundImage H-9: Picnic Area near Softball Outfield Image H-10: Reservable Picnic Area
-
Appendix H Site Assessment H-7
Multi-Use Lawn Spaces
There are several areas of unobstructed multi-use
lawn in Memorial Park. The northern portion of
the park contains the largest multi-use lawn. It is
rectangular, largely flat, and sits between the Quinlan Community Center and the reservable picnic area.

The lawn is bounded on the remaining sides by a
walking path within an alley of trees. The park also
has smaller lawn spaces serving passive use activities.

Playgrounds
There are two playgrounds at Memorial Park. A
playground appropriate for 2-5 year old children is
located on the north end of the site, situated between
the softball field and tennis courts. A playground
appropriate for 5-12 year old children is located on the southern end of the site adjacent to Anton Way and
the amphitheater. Both playgrounds are connected
by pathways, within walking distance of restrooms,
and have unshaded seating areas. Playgrounds are
buffered from vehicle traffic by other park amenities.

Both playgrounds provide composite play structures
focusing on play elements of brachiating, climbing,
sliding, and swinging. Balancing, spinning, and
sensory development are lacking in both structures.

Additionally, the composite play structures lack clear
paths of travel and accessible ramps. The playground
surfacing is composed of wood fiber surfacing
bounded by concrete curbs, which does not provide
an accessible transition.

Image H-11: Multi-use Lawn near Quinlan Community Center Image H-12: Playground, 2-5
Image H-13: Playground, 5-12Image H-14: Playground, 5-12 -
H-8 Memorial Park Specific Plan
Softball Field
Memorial Park features the only lighted softball field
in the City. The softball field is primarily used by
Cupertino Parks and Recreation sponsored leagues
and local teams, but is also available for drop-ins and reservations during the weekends and off-season.

This field attracts players and spectators from around
the entire South Bay region given the high quality of
this amenity.

Tennis Courts
There are six lighted first come, first served tennis
courts, one of which is dual-striped for pickleball.

The tennis courts are oriented north/south and are
divided by a low fence with gaps to allow movement
between courts. The tennis court area is protected by
a high fence with privacy and wind screens.

Spectator Seating
The tennis courts and softball field both feature
spectator seating consisting of concrete and brick
terraced seat walls embedded into a bermed area.

The spectator seating wraps around the softball
field’s home base, protected by sports netting and
partially shaded by trees. For the tennis courts, the
spectator seating runs along the western edge and
perpendicular to the sport’s direction of movement,
providing an optimized viewing experience for
games happening in the westernmost court. The
spectator seating directly connects to the adjacent
court via a gate in the low fencing. Both seating areas are reached by concrete stairs and do not feature
handrails or ramps.

Restrooms
There are two public restrooms in Memorial Park.

One restroom is located under the spectator seating
berm west of the tennis courts, and the other is behind the amphitheater’s audience seating area facing the
playground. These two restrooms are not sufficient
for the quantity of park visitors during heavy-
use times, and organizers often need to provide
additional portable toilets for events. Furthermore,
the restrooms are somewhat hidden away from the
more commonly used areas of the park, making the
public less aware of their availability.

Image H-15: Softball Field
Image H-16: Tennis Courts
Image H-17: Restrooms, West of Tennis Courts
-
Appendix H Site Assessment H-9
Maintenance and Storage Areas
There are three maintenance and storage areas in
the park. The primary maintenance storage area is
located in the northwest corner of the park behind the
softball field backstop. It has vehicle access from the Mary Avenue parking lot and the end of Christensen
Drive. The space is used by grounds maintenance
staff. The storage container located between the
softball field and the reservable picnic area is used
by the City’s Emergency Services to support the park
as an evacuation center and Quinlan Community
Center as an emergency shelter. The storage shed
located north of the softball field on the third base
line is used for softball equipment.

Cell Tower
The cell tower, located behind the softball outfield,
has an active lease through 2040. The cell tower and
the associated transformers cannot be relocated.

Seating
Scattered throughout the park are seating
opportunities. Most seating is arranged around
another park amenity, such as benches oriented
towards a playground or the amphitheater seating
facing the stage. Picnic tables are arranged organically throughout the park. There are several benches
and seat walls found along paths, such as near the
Cupertino Senior Center, the Veterans Memorial, and
the Quinlan courtyard area.

Drinking Fountains
There are drinking fountains north of the multi-use
lawn by the Quinlan Community Center, adjacent to
the restroom behind the amphitheater, and near the
softball field.

Trash Receptacles
There are trash and recycling receptacles throughout
Memorial Park, specifically near all picnic areas, with a compost container at the reservable picnic area.

Trash receptacle styles vary throughout the park.

Image H-18: Benches in Quinlan Courtyard
Image H-19: Seating Ledge in Veterans Memorial
Image H-20: Maintenance and Storage Area
-
H-10 Memorial Park Specific Plan
Trees and Landscaping
Memorial Park has several types of trees and
landscaping zones as shown in Figure H-2.

Trees
The Tree Inventory Report (Appendix B) studied
almost 500 trees within Memorial Park’s 22-acre area.

Most trees in the park are ornamental species or non-
native species that are commonly observed in the
region. A total of 28 species were identified, most of
which were Coast Redwood, Callery Pear, Coast Live
Oak, and Japanese Flowering Cherry.

Of the trees that were studied, approximately 80%
were identified as moderate to high suitability for
preservation. There are approximately 80 trees that
were assessed as low suitability and are recommended
for removal. Low suitability trees have poor health
or significant defects that cannot be abated with
treatment. All public trees, regardless of condition,
have protections as outlined in the City Municipal
Code and will require permit for removal.

Cherry trees have significance in the park—in
1983, the City was gifted 200 Japanese Flowering
Cherry trees from the City of Toyokawa, Japan to
commemorate the fifth anniversary of their Sister
City relationship. Memorial Park remains the home
of the annual Cupertino Cherry Blossom Festival
held every last weekend in April. Two of the Sister
City Japanese Flowering Cherry trees have stone
plaques. Although these do not meet the definition of
heritage trees as per the City Municipal Code Section

14.18, they will be preserved as part of the Memorial
Park Specific Plan.

Veterans Memorial is surrounded by a peaceful grove
of Red Maple trees. There is a Chinese Pistache tree
planted in memory of a City staff member adjacent to
the amphitheater.

Landscape Zones
The majority of Memorial Park’s landscape is
composed of lawn with little to no ornamental or
habitat planting. Planting or mulch areas occur near
the Quinlan Community Center, Cupertino Senior
Center, parking lots, and park edges.

The lawn areas require significant quantities of water
to support the park’s current programming and
require maintenance after large community events.

Image H-21: Japanese Flowering Cherry Trees
Image H-22: Coast Redwood
-
Appendix H Site Assessment H-11

Tree (High-Moderate)
Tree (Low)
Cherry Tree (High-Moderate)
Tree (In Memoriam or Sister City)

Lawn

Planting or Mulch
Suitability for Preservation
Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Quinlan
Community
Center
Cupertino
Senior Center 100’ 0 200’
Figure H-2: Trees and Landscape Zones
-0
-
-
■
H-12 Memorial Park Specific Plan
Cultural Elements
Memorial Park has several important cultural
elements, shown on Figure H-3.

Historic Gazebo
The original construction of the park included the
installation of the gazebo, now identified as a historic site in the General Plan. The wood trim was salvaged
from one of the Enoch Jasper Parrish homes, a local
architect and builder responsible for many of the
early homes in Cupertino. The Parrish family owned
the orchard that Memorial Park presently sits on—
their home was located where the Cupertino Senior
Center is today. In 1994, the Rotary Club of Cupertino
renovated the gazebo, now using it as a logo and
recognizing its contributors with the "Gazebo
Award."
Veterans Memorial
The Veterans Memorial was dedicated on November
11, 2007. The Veterans Memorial features a statue
titled “The Guardians,” which depicts Matthew
Axelson and James Suh, two Navy SEALs from
Cupertino who died in battle. The Veterans Memorial
also features a flagpole, a wall of honor with names
of other Cupertino residents who gave their lives in
the line of duty, and many engraved pavers.

Stone Lanterns
There are two stone lanterns in Memorial Park.

One was located in the center of the now-removed
pond. Both stone lanterns were gifted to the City of
Cupertino by the City of Toyokawa, Japan in 1988 to
commemorate the tenth anniversary of the Sister City
relationship. Both statues have engraved dedication
plaques.

Public Art
A lightpole for the softball field has a metal figure
of a player reaching for a catch. The painted bench
in front of the Cupertino Senior Center on Stevens
Creek Boulevard depicts two women collecting
cherry blossoms and reads “Cupertino-Toyokawa
Sister Cities Inc / Connecting Globally Since 1978.”
Image H-23: Historic Gazebo
Image H-24: Veterans Memorial Entrance and Engraved Pavers Image H-25: Sister City Stone Lantern and Monument
-
Appendix H Site Assessment H-13
1 Historic Gazebo
2 Veterans Memorial
3 Stone Lantern (Sister City)
4 Public Art
5 Memorial Bench
2 1
3 4
3 5
4 Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Cupertino
Senior Center
Quinlan
Community
Center
100’ 0 200’
Figure H-3: Cultural Elements
0 0
0 0
0 -
H-14 Memorial Park Specific Plan
Signage and Wayfinding
The main park sign is located to the east of the
Cupertino Senior Center and can be seen from
Stevens Creek Boulevard. Both the Cupertino Senior
Center and the Quinlan Community Center have
signage along their street frontage (Figure H-6).

To advertise upcoming events and festivals at
Memorial Park, temporary event signage is commonly
installed in two locations: at the corner of Stevens
Creek Boulevard and Anton Way, and the corner of
North Stelling Road and Alves Drive.

There are informational signs posted around the
park. Signs near the softball field and tennis courts
list the hours and rules of use. There is a scoreboard in the softball outfield. The large reservable picnic area opposite Quinlan Community Center includes a sign
about reservations. Additional informational signage
throughout the park includes signs discouraging
feeding of the geese, promoting smoke-free parks,
instructing dog owners to clean up after their pets
accompanied by bag dispensers, and designating
non-vehicular areas. There is also signage related to
the parking lots, memorials, and monuments, but
there is no wayfinding signage in the park.

Image H-26: Park Sign
Image H-27: Temporary Event Signage
Image H-28: Informational Signage
-
OVERl'Of'IILJ..HON ~
POOR HEALTH or Bl!ltlS
Ah UNHU.LTiiY C0~ClNTR.ITIO~ Of fltES
AGtRESSIVE BEH/,i'IQR lk G£ESl
Appendix H Site Assessment H-15
Figure H-4: Signage and Wayfinding
1 Main Park Sign
2 Temporary Event Signage
3 Cupertino Senior Center Sign
4 Quinlan Community Center Sign
13 2
2 4
Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Cupertino
Senior Center
Quinlan
Community
Center
100’ 0 200’
0 0
0 0
I
I
___ .J
-
H-16 Memorial Park Specific Plan
Lighting
Site lighting is provided throughout the park along
the majority of pathways, near amenities, on the
recreational buildings, and within the parking lots
(Figure H-7).

Light fixture styles are uniform throughout the park
but vary within the tennis courts and softball field
to support evening use. Additional light fixtures
occur around seat walls and in the shade structure
in the Quinlan courtyard. Supplemental lighting is
provided during community events. The existing
distribution of lighting does not present significant
safety concerns.

Image H-29: Court Lighting
Image H-30: Park Lighting
Image H-31: Quinlan Courtyard Shade Structure
-
Appendix H Site Assessment H-17
Figure H-5: Lighting
Park Light
Sport Light
Street Light
Parking Lot Light
Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Quinlan
Community
Center
Cupertino
Senior Center 100’ 0 200’
-
H-18 Memorial Park Specific Plan
Topography
The park gently slopes from the west at Mary Avenue
towards the east along North Stelling Road. Figure
H-8 shows the park’s topography and denotes the
high points and low points.

Relatively flat areas occur in high-activity zones such as the Quinlan event lawn. The remainder to the site
varies in slope and provides shallow berms in various
locations. The north side of the park provides steeper
sloped berms as visual protection from the adjacent
neighborhood along Christensen Drive. Significant
sloped berms occur at the tennis courts, softball
field, and amphitheater to accommodate seating.

These small hillsides also mitigate visual and noise
concerns to the adjacent residences.

Image H-32: Amphitheater Hillside
Image H-33: Shallow Berms
Image H-34: Tennis Court Hillside
-
Appendix H Site Assessment H-19
Figure H-6: Topography
High Point
Low Point
Anton Way
Mary Avenue
Stevens Creek Boulevard
Alves Drive
North Stelling Road
Christensen Drive
Cupertino
Senior Center
Quinlan
Community
Center
100’ 0 200’
-
This Page
Intentionally
Left Blank

← All documents from this meeting