PARK
MEMORIAL
SPECIFIC
PLAN
APPENDIXCITY OF CUPERTINO, FEBRUARY 2024
Memorial Park
revitalize
ATTACHMENT B
Attachment B
This Page
Intentionally
Left Blank
Appendix Table of Contents I
Table of Contents
Appendix A Parking Study
Appendix B
Tree Inventory Report
Appendix C
Community Engagement Data
Appendix D
Preliminary Concepts
Appendix E
Phase 1 Environmental Site Assessment
Appendix F
Geotechnical Evaluation
Appendix G
Planning Context
Appendix H
Site Assessment
■
This Page
Intentionally
Left Blank
Memorial Park Specific Plan A-1
Parking Study
Appendix A
-
This Page
Intentionally
Left Blank
Appendix A Parking Study A-3
CITY OF CUPERTINO
MEMORIAL PARK PARKING STUDY
JANUARY 2024
I
A-4 Memorial Park Specific Plan
CITY OF CUPERTINO
MEMORIAL PARK PARKING STUDY
Date: January 2024
Prepared for: Gates + Associates
Prepared by: TJKM Transportation Consultants
I
Appendix A Parking Study A-5
ICITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
TABLE OF CONTENTS
SUMMARY � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � III 1� INTRODUCTION � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 1 STUDY AREA � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 1 D
ATA COLLECTION � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 5 PARKING INVENTORY � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 5 P
ARKING OCCUPANCY � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 5 2� EXISTING PARKING SUPPLY � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 8 3� PARKING OCCUPANCY � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 12 PARKING OCCUPANCY ANALYSIS� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 12 4� PARKING POLICY AND MANAGEMENT STRATEGIES � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 27 5� IMPLEMENTATION PLAN � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 33 ///////////////////////////////////////////////////////////////////////////////// I
A-6 Memorial Park Specific Plan
IICITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
LIST OF FIGURES
Figure 1: On-street and Off-street Parking Supply � � � � � � � � � � � � � � � � � � � � � � � � � � � 6 Figure 2: Parking Restrictions � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 10 Figure 3: Overall Parking Occupancy on the Observed Weekday � � � � � � � � � � � � � � 12 Figure 4: Parking Occupancy at 11 am on a Weekday � � � � � � � � � � � � � � � � � � � � � � � 13 Figure 5: Parking Occupancy at 3 pm on a Weekday � � � � � � � � � � � � � � � � � � � � � � � � 14 Figure 6: On-street Parking Occupancy - Observed Weekday � � � � � � � � � � � � � � � � 15 Figure 7: Off-street Public Parking Occupancy - Observed Weekday � � � � � � � � � �16 Figure 8: Off-street Permit Parking Occupancy - Observed Weekday � � � � � � � � � �16 Figure 9: Overall Parking Occupancy on Observed Weekend � � � � � � � � � � � � � � � � � 17 Figure 10: Parking Occupancy at 5 pm on Observed Weekend � � � � � � � � � � � � � � � 18 Figure 11: On-street P
arking Occupancy - Observed Weekend � � � � � � � � � � � � � � � 19 Figure 12: Off-street Public Parking Occupancy - Observed Weekend � � � � � � � � �20 Figure 13: Off-street Permit Parking Occupancy - Observed Weekend � � � � � � � � �20 Figure 14: Overall Parking Occupancy on the Observed Weekend � � � � � � � � � � � � 21 Figure 15: Parking Occupancy at 5pm on Festival Day � � � � � � � � � � � � � � � � � � � � � � 22 Figure 16: On-street Parking Occupancy - Festival Day � � � � � � � � � � � � � � � � � � � � � � 23 Figure 17: Off-street Public Parking Occupancy - Festival Day � � � � � � � � � � � � � � � 24 Figure 18: Off-street Permit Parking Occupancy - Festival Day � � � � � � � � � � � � � � � 24
LIST OF TABLES
Table 1: Parking Supply Inventory � � � � � � � � � � � � � � � � � � � � � � � � � � �8 Table 2: Parking Supply by Restrictions � � � � � � � � � � � � � � � � � � � � � � �9 Table 3: Overall Parking Occupancy- Observed Weekday � � � � � 17 Table 4: Overall Parking Occupancy- Observed Weekend � � � � � 21 T
able 5: Overall Parking Occupancy - Festival Day � � � � � � � � � � � 25
LIST OF APPENDICES
Appendix A: Parking Supply Data Sheets
Appendix B: Parking Occupancy Data SheetsI
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-7
IIICITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
This study develops a parking occupancy and utilization analysis to document existing and potential parking capacity in Cupertino Memorial Park. The study area encompasses the park location bordered by Christensen Drive on the north, N. Stelling Road on the east, Alves Drive and Anton Way, Stevens Creek Boulevard on the south, and Mary Avenue on the west. There are 313 parking spaces – located in public and permit parking lots within the park perimeter and on-street parking along Alves in the study area. Of the available parking spaces, 82 percent are public or permit parking lot spaces and 18 percent are on-street parking spaces.
On the observed parking occupancy collection days, the findings suggest that the overall study area reached a maximum occupancy of 28 percent on the observed weekday, with 225 parking spaces unoccupied, and 51 percent on the observed weekend with 154 parking spaces unoccupied. On a representative festival or event day, the maximum occupancy was 45 percent, with 172 parking spaces unoccupied�
During the observed weekday, on-street parking reached a maximum of 4 percent occupancy, between 7 a. m. and 11 a.m., leaving 53 spaces available. During the observed weekday, off-street public parking reached a maximum of 38 percent occupancy, between 10 a.m. to 12 p.m., leaving 51 spaces open. Off-street permit parking, on the other hand, reached a maximum of 45 percent occupancy between 2 p. m. and 4 p. m. resulting in 48 unoccupied parking spaces on the observed weekday.
During the observed weekend, on-street parking reaches a maximum of 38 percent occupancy, between 4 p.m. to 5 p.m., leaving 34 spaces open. During the observed weekend, off-street public parking is observed to reach a maximum occupancy of 78 percent between 4 p.m. to 5 p.m., leaving 37 spaces open. Off-street permit parking, on the other hand, reached a maximum of 7 percent occupancy between 10 a.m. and 12 p.m., and 4 p.m. to 5 p.m., resulting in 82 unoccupied parking spaces on the observed weekend.
SUMMARY
///////////////////////////////////////////////////////////////////////////////// I
A-8 Memorial Park Specific Plan
1 1
1. INTRODUCTIONI
Appendix A Parking Study A-9
1CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
STUDY AREA
In order to understand existing parking supply, the following is a description of each parking resource within or immediate adjacent to Memorial Park:
OFF -STREET PARKING LOTS
Senior Center South (Lot 1)
This parking lot, associated with the Senior Center and used most by Senior Center users includes: 55 standard parking stalls and six (6) accessible ADA stalls. All parking aside from the ADA spots are permitted Senior Center use Monday-Saturday 8 a.m.-5 p.m.
1. INTRODUCTION
///////////////////////////////////////////////////////////////////////////////// I
A-10 Memorial Park Specific Plan
2CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Senior Center North (Lot 2)
Lot 2, located north of Senior Center Lot 1, includes 26 permitted Senior Center parking stalls and one (1) accessible ADA stall. Lot 3 includes, 32 standard parking stalls and two (2) accessible ADA stalls. Lot 3 is time limited to two hour parking from 8a.m. to 5p.m. In regards to the data collection, both of these parking lots were counted together and are referred as Zone “Park.”
Mary Avenue (Lot 3)
Mary Avenue is a two lane street with on-street parking allowed on both sides of the street except from 2 a.m.-5 a.m. Parallel parking with the bike lane serving as a buffer to the street is provided on the north block face with angled parking providing a buffer to a bike lane on the south block face.
A few Senior Center permitted parking spaces are available close to the park entry. The parking data collected does not include any of the on-street or permitted parking along Mary Avenue in the calculations.
I
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-11
3CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Alves Drive (Lot 4)
The parking lot accessed from Alves Drive, directly west of the Quinlan Community Center, includes: 48 standard parking stalls and two (2) ADA accessible stalls. This parking lot is used by general users of the park, including the picnic area and tennis courts along Christensen Drive�
Quinlan Community Center (Lot 5 & Lot 6)
The parking lot that services the Quinlan Community Center is divided into two spaces; the south lot (lot 5), generally associated with the Cupertino Room has: 33 regular parking stalls, two (2) ADA accessible stalls, four (4) reserved for electric vehicle charging, and three (3) reserved for City of Cupertino vehicles. The north lot (lot 6) generally associated with the Social Room has: 42 regular parking stalls, one (1) ADA accessible stall, and one (1) reserved for City of Cupertino vehicles.
///////////////////////////////////////////////////////////////////////////////// I
A-12 Memorial Park Specific Plan
4CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
ON-STREET PARKING STALLS
Anton Way
Anton Way, which runs from where Alves Drive terminates at the park south to where it ends at Stevens Creek Boulevard, is a two lane street along the eastern side of the park that does not allow on-street parking on either side. Signage is present that indicates parking is not allowed.
Alves Drive
Alves Drive, which runs along a part of the southeast portion of the park and next to the Quinlan Community Center currently allows for on-street parking in unmarked stalls. The north block face has no restrictions up to where the street turns south as Anton Way, and has several red curb locations on the south block face. Alves Drive provides main accessibility to the Alves Drive parking lot, also known as Parking Lot 1 on Google Maps.
On-street parking along Mary Avenue was not considered as part of this study.
-
i i ~
~
~
I
~
~
~
I i ~
~
~
I
~
~
Appendix A Parking Study A-13
5CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
DATA COLLECTION
TIn order to understand existing parking supply and utilization in the study area, the following data collection was performed:
PARKING INVENTORY
The number of parking spaces available in the study area was collected for on-street and off-street parking spaces (public and permit lots).
Time restrictions, accessible (ADA) spaces, and other regulations were classified.
PARKING OCCUPANCY
Hourly parking occupancy counts were collected 7, 9 and 11a.m. and 1, 3, and 5p.m. on Thursday October 6, 2022 and on Saturday, October 22, 2022 for public parking lots and permitted parking lots located in Memorial Park and the on-street block face along Alves Drive. Parking counts were also collected during the Bay Area Diwali Festival of Lights on Saturday, October 8, 2022 during the same times as listed above to serve as a representative event or festival�
Figure 1 illustrates locations and supply of parking spaces for on- street block faces and off street lots. Detailed parking data sheets with supply are provided in Attachment A.
///////////////////////////////////////////////////////////////////////////////// I
A-14 Memorial Park Specific Plan
6CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 1: On-street and Off-street Parking Supply
Cupertino Memorial
Park
0 34
•
Quinlan
Community
Center
Cupertino Sports
Center
On-street and Off-street
Parking Supply
- On-street Parking
Off-street Public
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-15
7 7
2. EXISTING PARKING SUPPLY
I
A-16 Memorial Park Specific Plan
8CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
PARKING SUPPLY
For analysis purpose, parking facilities in the study area are organized into on-street and off-street (public and permit). There are a total of 313 parking spaces in the study area, of which 55 are on-street spaces and 258 are off-street spaces. Of the 258 off-street parking spaces, 170 spaces are public parking and the remaining 88 spaces are by permit. Table 1 lists the number of on-street and off-street parking spaces�
Table 1: Parking Supply Inventory
Facility Type Number of Spaces Percentages
On - Street 55 18%
Off- Street (Public) 170 54%
Off- Street (Permit) 88 28%
Total 313 100%
2. EXISTING PARKING SUPPLY
I
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-17
9CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Of the total number (313) of parking spaces, 57 percent (178 spaces) are unrestricted spaces. 4.4 percent (14 spaces) are ADA parking spaces. 26 percent (81 spaces) are permit parking spaces. 10 percent (32 spaces) are 2 hour (8 a.m. – 5 p.m.) parking spaces. 1 percent (4 spaces) are EV charging parking spaces and 1 percent (4 spaces) are reserved for City vehicles only.
One hundred percent (55 spaces) of the on-street parking spaces are unrestricted (general use) parking spaces with no other parking restrictions enforced. 72 percent (123 spaces) of the public off-street parking are unrestricted (general use) parking with 19 percent (32 spaces) 2-hour parking spaces, 8 a.m. to 5 p.m. 2 percent (4 spaces) are reserved for City vehicles with the remaining 4 percent (7 spaces) ADA parking.
92 percent (81 spaces) are permit parking only with 8 percent (7 spaces) are ADA parking in lots with permitted parking from 8 a.m. to 5 p.m. Monday through Saturdays.
Table 2 lists the parking supply by restrictions.
Figure 2 illustrates the parking restrictions for on-street block faces and off-street parking lots in the study area.
Table 2: Parking Supply by Restrictions
Facility Type General ADA Permit Only 2 HR Parking EV Charging City Vehicles Total On - Street
55 0 0 0 0 0 55
100% 0% 0% 0% 0% 0% 100%
Off- Street (Public)
123 7 0 32 4 4 170
72% 4% 0% 19% 2% 2% 100%
Off- Street (Permit)
0 7 81 0 0 0 88
0% 8% 92% 0% 0% 0% 100%
Total
178 14 81 32 4 4 313
57% 4% 26% 10% 1% 1% 100%
///////////////////////////////////////////////////////////////////////////////// I
A-18 Memorial Park Specific Plan
10CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 2: Parking Restrictions
Cupertino Memorial
Park
•
Cupertino Sports
Center
I
On-street and Off-street
Parking Restrictions
~ City Vehicle Parking
P .. ] Permit Parking Only
@~ 2 Hrs Parking 8am • 5pm
® EV Charging
~ ADA Parking
® NO Parking
-
On-street Parking N
Off-street Public
A -
Off-street Permit
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-19
11 11
3. PARKING OCCUPANCY
I
A-20 Memorial Park Specific Plan
12CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
PARKING OCCUPANCY ANALYSIS
This section describes how parking was utilized hourly for on-street and off-street parking in Memorial Park during the days of collection.
A parking occupancy of 85 percent is typically defined as the practical threshold that indicates a healthy and balance parking usage between supply and demand. Parking occupancy below 85 percent is considered underutilized whereas an occupancy greater than 85 percent is considered over utilized. The section begins with analyzing trends of overall parking occupancy in the study area. Trends of both off-street and on-street parking occupancy over a weekday, weekend day as well as a representative festival day are analyzed. Parking data sheets with occupancy data is provided in Attachment B.
Weekday Occupancy Trends
This subsection analyzes the overall weekday trends of parking occupancy in the study area. This includes both on-street and off- street parking facilities. The peak period is observed between 11 a.m. and 3 p.m. with a maximum of 28 percent occupancy. This leaves about 225 parking spaces unoccupied. Figure 3 illustrates the parking occupancy trend for the entire study are from 7 a.m. to 5 p.m. The overall parking occupancy during a typical weekday is observed to be much lower than the 85 percent threshold throughout the day.
With the maximum occupancy of 28 percent between 11 a.m. and 3 p.m. Figure 4 and Figure 5 illustrates parking occupancy during these hours.
Figure 3: Overall Parking Occupancy on the Observed Weekday
3. PARKING OCCUPANCY
100%
90%
80%
70%
~
> 60% u
C:
.. 50% Q.
::,
u 40% u
0 30%
20%
10%
0%
7:00AM 9:00AM
,... - - - - - - - - - - - - - - - Maximum
28%
1 Occupancy
I
28% I
I
I
I
I
---------------'
1:00AM 1:00 PM 3:00PM 5:00 PM
Time of the Day
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-21
13CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 4: Parking Occupancy at 11 am on a Weekday
Cupertino Memorial
Park
Cupertino Sports
Center
Parking Occupancy
Weekday {11 am)
0 %- 10 %
11 %- 25 %
26 %- 40 %
///////////////////////////////////////////////////////////////////////////////// I
A-22 Memorial Park Specific Plan
14CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 5: Parking Occupancy at 3 pm on a Weekday
Cupertino Memorial
Park
Cupertino Sports
Center
Parking Occupancy
Weekday (3 pm)
- 0 %- 10 %
- 11 %- 25 %
26 %- 40 %
41 %-5 5 %
56 %- 70 %
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-23
15CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
On-Street Parking Weekday Occupancy
During the survey period, parking occupancy for on-street parking is observed to be significantly low with an average of 2 percent. A maximum occupancy of 4 percent was observed between 7 a.m. to 11 a.m., in the morning leaving approximately 53 spaces open. Figure 6 Illustrates the observed trends of on-street parking occupancy.
Figure 6: On-street Parking Occupancy - Observed Weekday 100%
90%
80%
70%
;f. 60%
~
C:
.. 50%
C. :,
u u 40% 0
30%
20%
10% 4% 4% 4% 2% 2% 2%
0%
7:00AM 9:00AM 11:00 AM 1:00 PM 3:00 PM 5:00PM
Time of the Day
~ On-street Parking --Threshold
///////////////////////////////////////////////////////////////////////////////// I
A-24 Memorial Park Specific Plan
16CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Off-Street Parking Weekday Occupancy
For both public and permit parking lots, parking occupancy on the observed weekday fluctuated from a low of 2 percent to a high of 45 percent. For the off-street public parking lots, the maximum occupancy of 38 percent was observed between 10 a.m. to 12 p.m., leaving approximately 105 spaces open. Figure 7 illustrates the observed trend of parking occupancy for off-street public parking and highlights the maximum occupancy period.
Figure 7: Off-street Public Parking Occupancy - Observed Weekday For the off-street permit parking lots, the maximum occupancy of 45 percent was observed between 2 p.m. to 4 p.m., leaving approximately 48 spaces open� Figure 8 illustrates the observed trend of parking occupancy for off-street permit parking and highlights the maximum occupancy period�
Figure 8: Off-street Permit Parking Occupancy - Observed Weekday 100%
90%
80%
70%
'#. 60%
> V
C:
"' 50%
0. :,
V
V
0 40%
30%
20%
10%
0%
7:00A M 9:00AM
r----,
38%
Maximum
Occupancy
11:00 AM 1:00 PM
Time of the Day
23%
3:00 PM
-e- off- Street Parking- Public --Threshold
26%
5:00 PM
I
100% r---
Maximum
90% Occupancy
80%
70%
'#. 60%
~
C:
"' 50% 45% 0. :,
V
V
0 40%
30%
20%
10%
0%
7:00A M 9:00A M 11:00A M 1 :00 PM 3:00 PM 5:00 PM
Time of the Day
-e- off-Street Parking- Private --Threshold
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-25
17CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Table 3 summarizes the parking occupancy for the entire study area, on-street as well as off-street, throughout the day on Thursday, October 6th, 2022, from 7 a.m. to 5 p.m. On-street parking occupancy between 7 a.m. to 11 a.m. was observed to reach a maximum of 4 percent occupancy. Off-street public parking lots which had 38 percent occupancy in the study area between 10 a.m. to 12 p.m. Permit parking lots had a 45 percent occupancy in the study between 2 p.m. to 4 p.m.
Table 3: Overall Parking Occupancy- Observed Weekday
7:00
AM
9:00
AM
11:00
AM
1:00
PM
3:00
PM
5:00
PM
On-street Parking 4% 4% 4% 2% 2% 2%
Off- Street Parking
- Public 7% 29% 38% 25% 23% 26%
Off-Street Parking –
Permit 2% 8% 25% 30% 45% 4%
Total 5% 19% 28% 23% 26% 16%
Weekend Occupancy Trends
This subsection analyzes the observed weekend trends of parking occupancy in the study area. This includes both on-street and off- street parking facilities. The peak period is observed between 4 p.m. and 5 p.m. with a maximum of 51 percent occupancy. This leaves about 153 parking spaces unoccupied. Figure 9 illustrates the parking occupancy trend for the entire study area from 7 a.m. to 5 p.m. While overall in the study area, parking occupancy remains much lower than the 85 percent threshold, block by block occupancy varies widely, between 7 percent to a maximum occupancy of 51 percent.
Figure 9: Overall Parking Occupancy on Observed Weekend Figure 10 illustrates parking occupancy during maximum hours. 100%
90% Maximum Occupancy
80%
7rf'/4
'.'!.
~ 6rf'/4
C 51%
"' 50% Q. ::,
V V
40% 0
0 30%
20%
10%
0%
7:00AM 9:00AM 11:00AM 1:00 PM 3:00 PM 5:00 PM
Time of the Day
-e- 0c:cupancy on Festival Days --Threshold
///////////////////////////////////////////////////////////////////////////////// I
A-26 Memorial Park Specific Plan
18CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 10: Parking Occupancy at 5 pm on Observed Weekend Cupertino Memorial
Park
•
Cupertino Sports
Center
Parking Occupancy
Weekend (5 pm)
- 0 %-10 %
- 11% - 25%
- 26% - 40 %
41%-55%
56% - 70 %
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-27
19CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
On-Street Weekend Parking Occupancy
During the survey period on weekends, parking occupancy for on- street parking fluctuated from a low of 11 percent to a high of 38 percent. The maximum occupancy of 38 percent was observed in the evening between 4 p.m. to 5 p.m., leaving approximately 34 spaces open� Figure 11 Illustrates the observed trends of on-street parking occupancy�
Figure 11: On-street Parking Occupancy - Observed Weekend 100%
90%
80%
70%
;JI. 60%
~
C:
"' 50%
Q. :,
~ 40%
30%
20% 16%
10%
0%
7:00AM
11% 13% 11%
9:00AM 11:00 AM 1 :00 PM
Time of the Day
~ On-street Parking --Threshold
r----,
Maximum 1
Occupancy 1
I
I
I
I
38%
I
_____ I
3:00 PM 5:00 PM
///////////////////////////////////////////////////////////////////////////////// I
A-28 Memorial Park Specific Plan
20CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Off-Street Parking Weekend Occupancy
For both public and permit parking lots on the weekend, parking occupancy fluctuated from a low of 1 percent to a high of 78 percent.
For off-street public parking lots, a maximum occupancy of 78 percent was observed between 4 p.m. to 5 p.m., leaving approximately 37 spaces open� Figure 12 illustrates the observed trend of parking occupancy for off-street public parking and highlights the peak period.
Figure 12: Off-street Public Parking Occupancy - Observed Weekend For off-street permit parking lots, a maximum occupancy of 7 percent was observed between 10 a.m. and 12 p.m., and 4 p.m. to 5 p.m., leaving approximately 82 spaces open. It is observed that the permit parking occupancy is consistently low throughout the day.
Figure 13 illustrates the observed trend of parking occupancy for off-street permit parking and highlights the period of maximum occupancy�
Figure 13: Off-street Permit Parking Occupancy - Observed Weekend I
100%
100% ,--- -
Maximum I 90%
90% Occupancy I
80%
80% 78%
70%
70%
;;/. 60%
;;/. 60% ~
C:
>
" C: ., 50% a. :,
tl
., 50% a. :,
" " 0 40%
0 40%
30%
30%
20%
20%
10% 7% 7%
10% 1% 2% 1% 2%
I 0%
--- - -0% 7:00AM 9:00AM 11:00AM 1:00 PM 3:00 PM 5:00 PM 7:00AM 9:00AM 11:00AM 1:00 PM 3:00 PM 5:00 PM Time of the Day Time of the Day
-e- otf-Street Parking - Private --Threshold
-e- off- Street Parking - Public --Threshold
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-29
21CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Table 4 summarizes the parking occupancy for the entire study area, on-street as well as off-street, throughout the day on Saturday, October 22, 2022, from 7 a.m. to 5 p.m. On-street parking occupancy between 4 p.m. to 5 p.m. was observed to reach a maximum of 38 percent occupancy. Public parking lots also had 78 percent occupancy in the study area during the same time period. Permit parking lots had a 7 percent occupancy in the study area between 10 a.m. and 12 p.m. and between 4 p.m. to 5 p.m.
Table 4: Overall Parking Occupancy- Observed Weekend
7:00
AM
9:00
AM
11:00
AM
1:00
PM
3:00
PM
5:00
PM
On-street Parking 16% 11% 13% 11% 16% 38%
Off- Street Parking
- Public 7% 17% 30% 18% 40% 78%
Off-Street Parking –
Permit 1% 2% 7% 1% 2% 7%
Total 7% 12% 20% 12% 25% 51%
Festival Day Occupancy Trends
This subsection analyzes event or festival day trends of parking occupancy in the study area during a representative festival. This includes both on-street and off-street parking facilities. The peak period is observed between 4 p.m. and 5p.m. with a maximum of 45 percent occupancy. This leaves about 172 parking spaces unoccupied.
Figure 14 illustrates the parking occupancy trend for the entire study are from 7 a.m. to 5 p.m. While overall in the study are, parking occupancy remains much lower than the 85 percent threshold, block by block occupancy varies between 5 percent to a maximum occupancy of 45 percent� Figure 15 illustrates parking occupancy during maximum occupancy hours.
Figure 14: Overall Parking Occupancy on a Festival Day
100%
90%
80%
70%
'J1.
1:' 60%
C:
"' 50% C.
:s
g 40%
0 30%
20%
10%
0%
Maximum Occupancy
22%
19% 19%
7:00AM 9:00AM 11:00AM 1:00PM 3:00 PM
Time of the Day
~ Occupancy Weekend % --Threshold
r---•
45%
5:00 PM
I
I
///////////////////////////////////////////////////////////////////////////////// I
A-30 Memorial Park Specific Plan
22CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Figure 15: Parking Occupancy at 5pm on a Festival Day
Cupertino Memorial
Park
Cupertino
Cupertino Sports
Center
Parking Occupancy
Festival Day {S pm)
- 0 %- 10 %
- 11 %- 25 %
- 26 % - 40 %
41 % -55 %
56 %- 70 %
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-31
23CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
On-Street Parking Festival Day Occupancy
During the survey period on the Bay Area Diwali Festival of Lights, October 8, 2022, parking occupancy fluctuated from zero to a high of 35 percent. The maximum occupancy of 35 percent was observed between 4 p.m. to 5 p.m., leaving approximately 36 spaces open.
Figure 16 Illustrates the observed trends of on-street parking occupancy�
Figure 16: On-street Parking Occupancy - Festival Day
100%
90% Maximum
80%
70%
'if. 60%
~ r:: ..
C.
50%
:,
tl 0 40% 35%
30%
18%
20%
10%
0%
7:00AM 9:00AM 11:00AM 1:00 PM 3:00 PM 5:00 PM
Time of the Day
~ On-street Parking --Threshold
///////////////////////////////////////////////////////////////////////////////// I
A-32 Memorial Park Specific Plan
24CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Off-Street Parking Festival Day Occupancy
For both public and permit parking lots on the festival day, parking occupancy fluctuated from a low of 1 percent to a high of 56 percent.
For off-street public parking lots, a maximum occupancy of 56 percent was observed between 4 p.m. to 5 p.m., leaving approximately 75 spaces open� Figure 17 illustrates the observed trend of parking occupancy for off-street public parking and highlights the period of maximum occupancy.
Figure 17: Off-street Public Parking Occupancy - Festival Day For off-street permit parking lots, a maximum occupancy of 42 percent was observed between 12 p.m. to 2 p.m., leaving approximately 51 spaces open� Figure 18 illustrates the observed trend of parking occupancy for off-street permit parking and highlights the period of maximum occupancy.
Figure 18: Off-street Permit Parking Occupancy - Festival Day 100%
90%
80%
70%
'#. 60%
~
C:
50% ..
CL :,
V
V
0 40%
30%
20%
10%
0%
7:00AM 9:00AM
Maximum
Occupancy
11:00 AM 1:00 PM
Time of the Day
I--------
1 I
I
56%
- - - - - - - - _I
3:00 PM 5:00 PM
~ Off- Street Parking- PublH: --Threshold
'#.
~
C:
..
Cl. :,
V
V
0 100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
1%
7:00AM
42%
1%
------
9:00AM 11:00AM 1:00 PM
Time of the Day
I
I
I
Maximum
Occupancy
3:00PM
~ Off-Street Parking - Private --Threshold
5:00 PM
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-33
25CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Table 5 summarizes the parking occupancy for the entire study area, on-street as well as off-street, throughout the Bay Area Diwali Festival Of Lights, October 8th, 2022, from 7 a.m. to 5 p.m. On-street parking occupancy between 4 p.m. to 5 p.m. was observed to reach a maximum of 35 percent occupancy. Public parking lots also had 56 percent occupancy in the study area during the same time period.
Permit parking lots had a 42 percent occupancy in the study area between 12 p.m. and 2 p.m.
It should be noted that parking was severely limited within the park and along Alves Drive during the festival so these numbers reflect parking used for VIPs, vendors, food trucks, and general closures.
Table 5: Overall Parking Occupancy - Festival Day
7:00
AM
9:00
AM
11:00
AM
1:00
PM
3:00
PM
5:00
PM
On-street Parking 0% 13% 18% 20% 27% 35%
Off- Street Parking
- Public 9% 30% 34% 40% 51% 56%
Off-Street Parking –
Permit 1% 1% 2% 42% 32% 28%
Total 5% 19% 22% 37% 41% 45%
///////////////////////////////////////////////////////////////////////////////// I
A-34 Memorial Park Specific Plan
26 26 26 26
4. PARKING POLICY AND
MANAGEMENT STRATEGIESI
Appendix A Parking Study A-35
27CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
This chapter describes a parking policy analysis and management strategies proposed for the study area. The recommended policies and strategies are developed based off the existing parking supply and utilization findings for Memorial Park, field review conducted on October 8, 2022, and general best practices for parking management.
Increase Public Awareness of Parking Options
The City of Cupertino website currently provides a map and directions to both the Senior Center and Quinlan Community Center, however, there is no detailed information provided regarding parking at either facility or the park overall other than a site map. It is recommended that more information about existing public parking options, more detailed maps, and regular updates be included.
With the rise in use and popularity of Google Maps and other traffic apps such as Waze, the City should proactively reach out to Google to ensure parking options and information are up to date on those navigation platforms. For example, Google Maps already has the Alves Drive parking lot pinned and identified as “Parking Lot 1 Memorial Park,” but none of the others are identified.
Information with respect to the locations of all public parking lots, hours of operation, and time limit restrictions can be integrated into websites or flyer formats for distribution at the Quinlan, Senior Center, special events, and surrounding neighborhoods.
4. PARKING POLICY AND
MANAGEMENT STRATEGIES
'\ f ~
\
9 • 9 I 9 9 --9 l 1·
9 9 ' q ,,,._DI i , <
,r 0
__ .. •H •
--
9 9
///////////////////////////////////////////////////////////////////////////////// I
A-36 Memorial Park Specific Plan
28CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Update and Improve Wayfinding/Directional
Signage and Create a Parking Brand
Well-designed parking wayfinding signs can better direct visitors to available parking options within Memorial Park.
Currently, there are no signs at park entry points at N. Stelling Road, Stevens Creek Boulevard, nor Mary Avenue pointing users to available parking options within the park. Signage at the Senior Center indicates clearly that those lots are permit parking only, with no directions provided that there is two-hour parking available further down in Lot
3. It is recommended that the City realign and perhaps consolidate existing parking wayfinding signs so that they are more visible and larger in size to direct drivers to options in different public parking lots�
A dynamic and recognizable public parking brand will clarify and promote public parking options and provide the user with an accessible and affirming experience and can be incorporated on all parking wayfinding signage, and on marketing and education materials.
The design of the signs should reflect the new parking brand that will allow them to be recognizable to drivers as they enter the park area and navigate surrounding streets�
The City should also explore proper naming or numbering of lots so visitors can easily locate available public parking.
I
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-37
29CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
and Anton Drive, similar to the existing one at N.. Stelling Road and Alves Drive, would provide a safe crossing from De Anza parking and eliminate the need to cross mid-block, as people do now while dodging traffic on Stevens Creek Boulevard.
Improve Pedestrian and Bicyclist
Environment
While there are identified and designated bike lanes on N. Stelling Road, Stevens Creek Boulevard, and Mary Avenue, which allow for easy accessibility by bike to the park, once the bicyclists actually enter the park, there are no facilities available to them. While active bike riding might not be encouraged within the park itself at this time, placing bike racks and/or bike lockers at the Senior Center, Quinlan Community Center, and perhaps in a few locations there is park access from Alves Drive or Anton Drive is recommended. Increasing the number and location of short-term and long-term bike parking installations would encourage additional usage as well as safe and permanent options for bike users, especially park employees.
Bike dismount signs can also be placed strategically within the park to remind visitors bike riding is not recommended on the existing paths and sidewalks.
These steps will foster and encourage more bicycle use to the park in preparation for actual bike paths being installed within the park per the 2016 Bicycle and Pedestrian Transportation Plan.
Regarding pedestrians, for daily use, the existing sidewalks and walkways are sufficient for existing use. However, during special events, it was observed that visitors trying to access the events in the park that utilize De Anza College parking would sometimes cross Stevens Creek mid-block instead of walking to the existing crosswalks at the N. Stelling Road or Mary Avenue intersections. Installing a designated pedestrian crosswalk with enhanced safety features such as a rectangular rapid flashing beacon at Stevens Creek Boulevard ///////////////////////////////////////////////////////////////////////////////// I
A-38 Memorial Park Specific Plan
30CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Establish Additional Parking along Alves
Drive
Alves Drive, which runs along a part of the southeast portion of the park and next to the Quinlan Community Center, currently allows for on-street parking in unmarked stalls. The north block face has no restrictions up to where the street turns south as Anton Way, and has several red curb locations on the south block face. In order to maximize the current on-street parking to its fullest potential and capacity, parking T locations should be marked out and painted permanently on the street surface on both sides of Alves Drive.
Shared Parking Agreements
Currently, the City does not reserve any parking on the De Anza College campus for City events, however, for future City sponsored events, a more formal agreement could be pursued. If the most visible De Anza College lots along N. Stelling Road and Stevens Creek Boulevard are not available, the City and college could explore using the Flint Center parking structure during those times with shuttle service available to and from the park.
Should increased parking demand show the need, the City could explore shared parking agreements with private property owners, such as Abundant Life Assembly of God, to provide additional public parking options by leveraging existing parking supply during times, usually in the evenings and Saturdays when the parking supply is typically underutilized.
The current policy for additional park events that are not City run, such as the Bay Area Diwali Festival of Lights, require contact with De Anza College to secure parking use and verification by the City of such arrangements before the permit is approved. It is recommended that this arrangement continue but perhaps reviewed to ensure equity and accessibility for non-City run events that wish to use the park. @-IDeAnza
J!bJCollege
ABUNDANT
LIFEam:m!lll!/J
Memorial Park CUP ERTINO
///////////////////////////////////////////////////////////////////////////////// I
Appendix A Parking Study A-39
31CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Maintain Current Parking Configuration
along Mary Avenue
Mary Avenue is a two lane street with on-street parking allowed on both sides of the street except from 2 a.m.-5 a.m., Parallel parking with the bike lane serving as a buffer to the street is provided on the north block face with angled parking providing a buffer to a bike lane on the south block face.
A few Senior Center permitted parking spaces are available. Since this parking is utilized significantly during park events, this on-street parking should be maintained in its current configuration.
Parallel Parking along Anton Way
With the addition of eight pickle ball courts on the park’s southeast corner, near the Anton Way and Stevens Creek Boulevard intersection, nine parallel parking spaces along Anton Way are being included.
While the current parking analysis indicates there is capacity to handle the addition of these pickle ball courts, parking should be monitored to see how the current parking supply is impacted. Additional parallel parking along Anton Way could be considered in the future, but that would necessitate the taking of additional parkland along the street edge, which may not be desirable.
///////////////////////////////////////////////////////////////////////////////// I
A-40 Memorial Park Specific Plan
32CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
Consider Making Anton Way One-Way
Since Anton Way is currently a narrow two-lane street that does not allow for parking on either side, another option for parking along Anton Way is for the City to conduct a feasibility study of turning the portion of Anton Way from Stevens Creek Boulevard to Patriot Way to one-way heading north. This configuration is used to great success during events and could be tried out on a temporary basis, but for a longer period of time than a weekend. This would free up the travel lane closest to the park to be utilized as either additional parallel parking or angled parking if a need arises for that level of parking capacity. Obviously, the surrounding neighborhood would need to be consulted and approve this type of change. With the addition of the pickle ball courts in the portion of the park closest to the Anton Way and Stevens Creek intersection, this parking option might allow for both more parking and better traffic flow.
A Parking Structure
When considering the need for structured parking, it is important to remember that occupancy of 85 percent is typically defined by the parking industry as the practical threshold that indicates a healthy and balance parking usage between supply and demand. Parking occupancy below 85 percent is considered underutilized whereas an occupancy greater than 85 percent is considered over utilized.
Current data suggests that while there may be times where parking is at a premium during certain dates and times, the overall data does not support the need for any sort of parking structure. The City should optimize and improve the efficiency and management of existing parking resources first and then conduct a viability study when the parking supply and demand are within that 85 percent range over a sustained period of time.
I
///////////////////////////////////////////////////////////////////////////////// Appendix A Parking Study A-41
33CITY OF CUPERTINO MEMORIAL PARK PARKING STUDY
# Action Description Timeline
Short-Term Recommendations
1 Increase public awareness of parking
options
• Update City and other relevant websites
• Utilize Google or Waze by pinpointing parking lots
• Creation of parking education and outreach campaign
0-2 years
2 Update/improve wayfinding and
directional signage
• Install new directional and wayfinding signage
• Create a parking brand
• Name or number existing public parking lots
0-2 years
3 Improve pedestrian and bicyclist
environment
• Install bike racks and storage in park
• Install bike dismount signs on park periphery
• Review possible mid-block pedestrian location on Stevens Creek at Anton Way 0-2 years
4 Establish additional parking along Alves
Drive • Mark out and paint parking T locations along both sides of Alves Drive 0-2 years Mid-Term Recommendations
5 Shared parking agreements • Explore viability of shared parking agreements, especially De Anza College, and begin conversations with other interested property owners 2-5 years
Long-Term Recommendations
6 Maintain current parking configuration
along Mary Avenue
• Maintain current parking configuration and time limits along Mary Avenue with stripping and signage maintenance occurring on a regular basis� 5+ years
7 Parallel parking along Anton Way • Consider constructing additional parallel parking spaces along Anton Way to complement parallel parking planned as part of pickle-ball courts on Anton Way 5+ years
8 Consider making Anton Way one-way • Consider making Anton Way one-way to convert one lane of traffic to parallel or angled parking and to serve as a traffic control measure 5+ years
9 Explore a parking structure • Once parking demand has reached a consistent 85% level of occupancy over a period of five or more years, conduct a feasibility study to determine need of a parking structure 5+ years
5. IMPLEMENTATION PLAN
- -
///////////////////////////////////////////////////////////////////////////////// I
A-42 Memorial Park Specific Plan
34 34
APPENDIX A:
PARKING SUPPLY DATA SHEETSI
Appendix A Parking Study A-43
Zone Facilty Type Total
Supply
Regular
Supply
ADA
Supply
Permit
Only
Supply
2HR 8am‐
5pm
Supply
EV
Charging
Supply
City
Vehicles
Only
Supply
Senior Center South (Lot 1) 6 106 5 5000
Senior Center North (Lot 2) 2 701 2 6000
Mary Avenue (Lot 3) 3 402 3 200
Alves Drive (Lot 4) 5 0 4 820000
Community Center South (Lot 5) 4 2 3 320043
Community Center North (Lot 6) 4 4 4 210001
Alves North 1 1 0 1 000000
Alves North 2 2 0 2 000000
Alves South 1 1 5 1 500000
Alves South 2 10 1 000000
Anton East 1 0000000
Anton East 2 0000000
Anton West 1 0000000
Anton West 2 0000000
TOTAL 313 178 14 81 32 4 4
Off‐ Street Permit
Off‐ Street Public
On Street
Parking Supply
A-44 Memorial Park Specific Plan
35 35
APPENDIX B:
PARKING OCCUPANCY DATA
SHEETSI
Appendix A Parking Study A-45
Weekday Occupancy
Zone Facilty Type 7:00 AM 9:00 AM 11:00 AM 1:00 PM 3:00 PM 5:00 PM Senior Center North (Lot 2) Off‐ Street Public 3% 18% 41% 15% 9% 15% Mary Avenue (Lot 3) Off‐ Street Permit 3% 22% 28% 19% 28% 0% Alves Drive (Lot 4) Off‐ Street Public 0.12 0.26 0.36 0.32 0.44 0.34 Alves North 2 On Street 0% 0% 0% 0% 0% 0%
Alves North 1 On Street 10% 20% 20% 10% 10% 10%
Alves South 1 On Street 7% 0% 0% 0% 0% 0%
Alves South 2 On Street 0% 0% 0% 0% 0% 0%
Senior Center South (Lot 1) Off‐ Street Permit 2% 0% 23% 36% 54% 7% Anton East 2 On Street 0% 0% 0% 0% 0% 0%
Anton East 1 On Street 0% 0% 0% 0% 0% 0%
Anton West 2 On Street 0% 0% 0% 0% 0% 0%
Anton West 1 On Street 0% 0% 0% 0% 0% 0%
Community Center South (Lot 5) Off‐ Street Public 10% 29% 38% 33% 21% 40% Community Center North (Lot 6) Off‐ Street Public 2% 41% 36% 16% 11% 11% Total 5% 18% 28% 22% 26% 15%
Festival Day Occupancy
Zone Facilty Type 7:00 AM 9:00 AM 11:00 AM 1:00 PM 3:00 PM 5:00 PM Senior Center North (Lot 2) Off‐ Street Public 24% 3% 41% 71% 44% 88% Mary Avenue (Lot 3) Off‐ Street Permit 0% 0% 0% 19% 16% 19% Alves Drive (Lot 4) Off‐ Street Public 0% 2% 12% 4% 6% 6% Alves North 2 On Street 0% 35% 50% 50% 50% 75%
Alves North 1 On Street 0% 0% 0% 0% 0% 0%
Alves South 1 On Street 0% 0% 0% 7% 33% 27%
Alves South 2 On Street 0% 0% 0% 0% 0% 0%
Senior Center South (Lot 1) Off‐ Street Permit 2% 2% 3% 51% 38% 31% Anton East 2 On Street 0% 0% 0% 0% 0% 0%
Anton East 1 On Street 0% 0% 0% 0% 0% 0%
Anton West 2 On Street 0% 0% 0% 0% 0% 0%
Anton West 1 On Street 0% 0% 0% 0% 0% 0%
Community Center South (Lot 5) Off‐ Street Public 12% 76% 64% 76% 90% 88% Community Center North (Lot 6) Off‐ Street Public 5% 39% 23% 23% 68% 59% Total 5% 19% 22% 36% 41% 44%
Weekday ‐ Oct 6th, 2022 Festival Day‐ Oct 8th, 2022
A-46 Memorial Park Specific Plan
Weekend Occupancy
Zone Facilty Type 7:00 AM 9:00 AM 11:00 AM 1:00 PM 3:00 PM 5:00 PM Senior Center North (Lot 2) Off‐ Street Public 12% 32% 9% 21% 18% 59% Mary Avenue (Lot 3) Off‐ Street Permit 0% 0% 0% 0% 3% 16% Alves Drive (Lot 4) Off‐ Street Public 12% 26% 54% 20% 26% 100% Alves North 2 On Street 0% 0% 0% 0% 20% 45%
Alves North 1 On Street 30% 200% 200% 100% 100% 100%
Alves South 1 On Street 13% 7% 27% 13% 13% 40%
Alves South 2 On Street 40% 0% 0% 0% 0% 0%
Senior Center South (Lot 1) Off‐ Street Permit 2% 3% 10% 2% 2% 2% Anton East 2 On Street 0% 0% 0% 0% 0% 0%
Anton East 1 On Street 0% 0% 0% 0% 0% 0%
Anton West 2 On Street 0% 0% 0% 0% 0% 0%
Anton West 1 On Street 0% 0% 0% 0% 0% 0%
Community Center South (Lot 5) Off‐ Street Public 2% 10% 45% 31% 81% 83% Community Center North (Lot 6) Off‐ Street Public 2% 2% 5% 2% 34% 61% Total 7% 12% 20% 12% 25% 50%
Weekend‐ Oct 22nd, 2022I
Appendix A Parking Study A-47
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/6/2022 7:00 AM Lot 2 & Lot 3 2 3% 0 0% 0 0% 1 4% 1 3% 0 0% 0 0% 10/6/2022 7:00 AM Alves Drive (Lot 4) 6 12% 6 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Alves South 1 1 7% 1 7% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM Community Center South 4 10% 1 3% 0 0% 0 0% 0 0% 0 0% 3 100% 10/6/2022 7:00 AM Community Center North 1 2% 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 7:00 AM TOTAL 16 5% 10 6% 0 0% 2 2% 1 3% 0 0% 3 75% 10/6/2022 9:00 AM Lot 2 & Lot 3 13 21% 0 0% 0 0% 7 27% 6 19% 0 0% 0 0% 10/6/2022 9:00 AM Alves Drive (Lot 4) 13 26% 13 27% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Alves North 1 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Senior Center South (Lot 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM Community Center South 12 29% 8 24% 0 0% 0 0% 0 0% 1 25% 3 100% 10/6/2022 9:00 AM Community Center North 18 41% 18 43% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 9:00 AM TOTAL 58 19% 41 23% 0 0% 7 9% 6 19% 1 25% 3 75% 10/6/2022 11:00 AM Lot 2 & Lot 3 23 38% 0 0% 0 0% 9 35% 14 44% 0 0% 0 0% 10/6/2022 11:00 AM Alves Drive (Lot 4) 18 36% 17 35% 1 50% 0 0% 0 0% 0 0% 0 0% Weekday Occupancy ‐ October 6, 2022
A-48 Memorial Park Specific Plan
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/6/2022 11:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Alves North 1 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Senior Center South (Lot 1 14 23% 0 0% 4 67% 10 18% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM Community Center South 16 38% 12 36% 0 0% 0 0% 0 0% 1 25% 3 100% 10/6/2022 11:00 AM Community Center North 16 36% 16 38% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 11:00 AM TOTAL 89 28% 47 26% 5 36% 19 23% 14 44% 1 25% 3 75% 10/6/2022 1:00 PM Lot 2 & Lot 3 11 18% 0 0% 0 0% 6 23% 5 16% 0 0% 0 0% 10/6/2022 1:00 PM Alves Drive (Lot 4) 16 32% 16 33% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Senior Center South (Lot 1 22 36% 0 0% 2 33% 20 36% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM Community Center South 14 33% 9 27% 0 0% 0 0% 0 0% 2 50% 3 100% 10/6/2022 1:00 PM Community Center North 7 16% 7 17% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 1:00 PM TOTAL 71 23% 33 19% 2 14% 26 32% 5 16% 2 50% 3 75% 10/6/2022 3:00 PM Lot 2 & Lot 3 12 20% 0 0% 0 0% 9 35% 3 9% 0 0% 0 0% 10/6/2022 3:00 PM Alves Drive (Lot 4) 22 44% 22 46% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0%I Appendix A Parking Study A-49
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/6/2022 3:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Senior Center South (Lot 1 33 54% 0 0% 5 83% 28 51% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM Community Center South 9 21% 5 15% 0 0% 0 0% 0 0% 1 25% 3 100% 10/6/2022 3:00 PM Community Center North 5 11% 5 12% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 3:00 PM TOTAL 82 26% 33 19% 5 36% 37 46% 3 9% 1 25% 3 75% 10/6/2022 5:00 PM Lot 2 & Lot 3 5 8% 0 0% 0 0% 0 0% 5 16% 0 0% 0 0% 10/6/2022 5:00 PM Alves Drive (Lot 4) 17 34% 17 35% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Senior Center South (Lot 1 4 7% 0 0% 0 0% 4 7% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM Community Center South 17 40% 13 39% 0 0% 0 0% 0 0% 1 25% 3 100% 10/6/2022 5:00 PM Community Center North 5 11% 5 12% 0 0% 0 0% 0 0% 0 0% 0 0% 10/6/2022 5:00 PM TOTAL 49 16% 36 20% 0 0% 4 5% 5 16% 1 25% 3 75% 10/6/2022 AVERAGE 61 19% 33 19% 2 14% 16 20% 6 18% 1 25% 3 75% A-50 Memorial Park Specific Plan
Date Time Zone
Total Occupancy
Total % Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/8/2022 7:00 AM Lot 2 & Lot 3 8 13% 0 0% 0 0% 0 0% 8 25% 0 0% 0 0% 10/8/2022 7:00 AM Alves Drive (Lot 4) 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM Community Center South ( 5 12% 1 3% 0 0% 0 0% 0 0% 1 25% 3 100% 10/8/2022 7:00 AM Community Center North ( 2 5% 2 5% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 7:00 AM TOTAL 16 5% 3 2% 0 0% 1 1% 8 25% 1 25% 3 75% 10/8/2022 9:00 AM Lot 2 & Lot 3 1 2% 0 0% 0 0% 0 0% 1 3% 0 0% 0 0% 10/8/2022 9:00 AM Alves Drive (Lot 4) 1 2% 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Alves North 2 7 35% 7 35% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 9:00 AM Community Center South ( 32 76% 23 70% 2 100% 0 0% 0 0% 4 100% 3 100% 10/8/2022 9:00 AM Community Center North ( 17 39% 15 36% 1 100% 0 0% 0 0% 0 0% 1 100% 10/8/2022 9:00 AM TOTAL 59 19% 46 26% 3 21% 1 1% 1 3% 4 100% 4 100% 10/8/2022 11:00 AM Lot 2 & Lot 3 14 23% 0 0% 0 0% 0 0% 14 44% 0 0% 0 0% 10/8/2022 11:00 AM Alves Drive (Lot 4) 6 12% 6 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Alves North 2 10 50% 10 50% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% Festival Day Occupancy ‐ October 8, 2022I
Appendix A Parking Study A-51
Date Time Zone
Total Occupancy
Total % Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/8/2022 11:00 AM Alves South 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Senior Center South (Lot 1 2 3% 0 0% 0 0% 2 4% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 11:00 AM Community Center South ( 27 64% 22 67% 1 50% 0 0% 0 0% 1 25% 3 100% 10/8/2022 11:00 AM Community Center North ( 10 23% 8 19% 1 100% 0 0% 0 0% 0 0% 1 100% 10/8/2022 11:00 AM TOTAL 69 22% 46 26% 2 14% 2 2% 14 44% 1 25% 4 100% 10/8/2022 1:00 PM Lot 2 & Lot 3 30 49% 0 0% 0 0% 6 23% 24 75% 0 0% 0 0% 10/8/2022 1:00 PM Alves Drive (Lot 4) 2 4% 2 4% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Alves North 2 10 50% 10 50% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Alves South 1 1 7% 0 0% 1 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Senior Center South (Lot 1 31 51% 0 0% 1 17% 30 55% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM Community Center South ( 32 76% 26 79% 2 100% 0 0% 0 0% 1 25% 3 100% 10/8/2022 1:00 PM Community Center North ( 10 23% 9 21% 1 100% 0 0% 0 0% 0 0% 0 0% 10/8/2022 1:00 PM TOTAL 116 37% 47 26% 5 36% 36 44% 24 75% 1 25% 3 75% 10/8/2022 3:00 PM Lot 2 & Lot 3 20 33% 0 0% 0 0% 5 19% 15 47% 0 0% 0 0% 10/8/2022 3:00 PM Alves Drive (Lot 4) 3 6% 3 6% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Alves North 2 10 50% 10 50% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Alves South 1 5 33% 0 0% 5 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Senior Center South (Lot 1 23 38% 0 0% 2 33% 21 38% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% A-52 Memorial Park Specific Plan
Date Time Zone
Total Occupancy
Total % Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/8/2022 3:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM Community Center South ( 38 90% 29 88% 2 100% 0 0% 0 0% 4 100% 3 100% 10/8/2022 3:00 PM Community Center North ( 30 68% 30 71% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 3:00 PM TOTAL 129 41% 72 40% 9 64% 26 32% 15 47% 4 100% 3 75% 10/8/2022 5:00 PM Lot 2 & Lot 3 36 59% 0 0% 3 100% 3 12% 30 94% 0 0% 0 0% 10/8/2022 5:00 PM Alves Drive (Lot 4) 3 6% 3 6% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Alves North 2 15 75% 15 75% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Alves South 1 4 27% 0 0% 4 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Alves South 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Senior Center South (Lot 1 19 31% 0 0% 1 17% 18 33% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM Community Center South ( 37 88% 30 91% 1 50% 0 0% 0 0% 3 75% 3 100% 10/8/2022 5:00 PM Community Center North ( 26 59% 26 62% 0 0% 0 0% 0 0% 0 0% 0 0% 10/8/2022 5:00 PM TOTAL 140 45% 74 42% 9 64% 21 26% 30 94% 3 75% 3 75% 10/8/2022 AVERAGE 88 28% 48 27% 5 33% 15 18% 15 48% 2 58% 3 83%I Appendix A Parking Study A-53
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/22/2022 7:00 AM Lot 2 & Lot 3 4 7% 0 0% 0 0% 0 0% 4 13% 0 0 0 0 10/22/2022 7:00 AM Alves Drive (Lot 4) 6 12% 6 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Alves North 1 3 30% 3 30% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Alves South 1 2 13% 2 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Alves South 2 4 40% 4 40% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM Community Center South ( 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 1 33% 10/22/2022 7:00 AM Community Center North ( 1 2% 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 7:00 AM TOTAL 22 7% 16 9% 0 0% 1 1% 4 13% 0 0% 1 25% 10/22/2022 9:00 AM Lot 2 & Lot 3 11 18% 0 0% 0 0% 0 0% 11 34% 0 0% 0 0% 10/22/2022 9:00 AM Alves Drive (Lot 4) 13 26% 13 27% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Alves North 1 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Alves South 1 1 7% 1 7% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Alves South 2 3 30% 3 30% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Senior Center South (Lot 1 2 3% 0 0% 0 0% 2 4% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM Community Center South ( 4 10% 2 6% 0 0% 0 0% 0 0% 1 25% 1 33% 10/22/2022 9:00 AM Community Center North ( 1 2% 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 9:00 AM TOTAL 37 12% 22 12% 0 0% 2 2% 11 34% 1 25% 1 25% 10/22/2022 11:00 AM Lot 2 & Lot 3 3 5% 0 0% 0 0% 0 0% 3 9% 0 0% 0 0% 10/22/2022 11:00 AM Alves Drive (Lot 4) 27 54% 27 56% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% Weekend Occupancy ‐ October 22, 2022
A-54 Memorial Park Specific Plan
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/22/2022 11:00 AM Alves South 1 4 27% 4 27% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Alves South 2 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Senior Center South (Lot 1 6 10% 0 0% 1 17% 5 9% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 11:00 AM Community Center South ( 19 45% 16 48% 1 50% 0 0% 0 0% 1 25% 1 33% 10/22/2022 11:00 AM Community Center North ( 2 5% 1 2% 0 0% 0 0% 0 0% 0 0% 1 100% 10/22/2022 11:00 AM TOTAL 64 20% 51 29% 2 14% 5 6% 3 9% 1 25% 2 50% 10/22/2022 1:00 PM Lot 2 & Lot 3 7 11% 0 0% 0 0% 0 0% 7 22% 0 0% 0 0% 10/22/2022 1:00 PM Alves Drive (Lot 4) 10 20% 10 21% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Alves North 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Alves North 1 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Alves South 1 2 13% 2 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Alves South 2 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM Community Center South ( 13 31% 12 36% 0 0% 0 0% 0 0% 0 0% 1 33% 10/22/2022 1:00 PM Community Center North ( 1 2% 1 2% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 1:00 PM TOTAL 38 12% 29 16% 0 0% 1 1% 7 22% 0 0% 1 25% 10/22/2022 3:00 PM Lot 2 & Lot 3 7 11% 0 0% 0 0% 1 4% 6 19% 0 0% 0 0% 10/22/2022 3:00 PM Alves Drive (Lot 4) 13 26% 13 27% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Alves North 2 4 20% 4 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Alves North 1 1 10% 1 10% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Alves South 1 2 13% 2 13% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Alves South 2 2 20% 2 20% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0%I Appendix A Parking Study A-55
Date Time Zone
Total Occupancy
Total %
Occupied
Regular
Regular %
Occupied
ADA
ADA % Occupied
Permit Only
Permit %
Occupied
2HR 8am‐5pm
2HR 8am‐5pm %
Occupied
EV Charging
EV % Occupied
City Vehicles
Only
City Vehicles
Only % Occupied
10/22/2022 3:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM Community Center South ( 34 81% 31 94% 2 100% 0 0% 0 0% 0 0% 1 33% 10/22/2022 3:00 PM Community Center North ( 15 34% 15 36% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 3:00 PM TOTAL 79 25% 68 38% 2 14% 2 2% 6 19% 0 0% 1 25% 10/22/2022 5:00 PM Lot 2 & Lot 3 25 41% 0 0% 3 100% 2 8% 20 63% 0 0% 0 0% 10/22/2022 5:00 PM Alves Drive (Lot 4) 50 100% 48 100% 2 100% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Alves North 2 9 45% 9 45% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Alves North 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Alves South 1 6 40% 6 40% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Alves South 2 6 60% 6 60% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Senior Center South (Lot 1 1 2% 0 0% 0 0% 1 2% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Anton East 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Anton East 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Anton West 2 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Anton West 1 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM Community Center South ( 35 83% 32 97% 1 50% 0 0% 0 0% 1 25% 1 33% 10/22/2022 5:00 PM Community Center North ( 27 61% 27 64% 0 0% 0 0% 0 0% 0 0% 0 0% 10/22/2022 5:00 PM TOTAL 159 51% 128 72% 6 43% 3 4% 20 63% 1 25% 1 25% 10/22/2022 AVERAGE 67 21% 52 29% 2 12% 2 3% 9 27% 1 13% 1 29% This Page
Intentionally
Left Blank
Memorial Park Specific Plan B-1
Tree Inventory Report
Appendix B
Tree Inventory Report
Appendix B
-
This Page
Intentionally
Left Blank
Appendix B Tree Inventory Report B-3
Tree Inventory Report. Memorial Park, Cupertino. Page 1 David J. Powers & Associates November 2022
HortScience│Bartlett Consulting ● Divisions of The F.A. Bartlett Tree Expert Company 2550 Ninth Street Suite 112, Berkeley, CA, 94710, 925.484.0211 ● www.hortscience.com
Tree Inventory Report
Memorial Park
Cupertino, CA
PREPARED FOR:
David J. Powers & Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
PREPARED BY:
HortScience | Bartlett Consulting
2250 Ninth St. Suite 112
Berkeley, CA 94710
November, 2022
Tree Inventory Report. Memorial Park, Cupertino. Page 1 David J. Powers & Associates November 2022
HortScience│Bartlett Consulting ● Divisions of The F.A. Bartlett Tree Expert Company 2550 Ninth Street Suite 112, Berkeley, CA, 94710, 925.484.0211 ● www.hortscience.com
Tree Inventory Report
Memorial Park
Cupertino, CA
PREPARED FOR:
David J. Powers & Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
PREPARED BY:
HortScience | Bartlett Consulting
2250 Ninth St. Suite 112
Berkeley, CA 94710
November, 2022
- HORT SCIENCE
w BARTLETT CONSU LTING
-
B-4 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 2 David J. Powers & Associates November 2022
HortScience│Bartlett Consulting ● Divisions of The F.A. Bartlett Tree Expert Company 2550 Ninth Street Suite 112, Berkeley, CA, 94710, 925.484.0211 ● www.hortscience.com
Tree Inventory Report
Memorial Park
Cupertino, CA
Table of Contents
Page
Introduction and Overview 1
Assessment Methods 1
Description of Trees 2
Suitability for Preservation 9
Tree Preservation Guidelines 11
List of Tables
Table 1. Tree condition and frequency of occurrence 3
Table 2. Tree suitability for preservation 10
Attachments
Tree Inventory Map
Tree Assessment Form
-
Appendix B Tree Inventory Report B-5
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Tree Inventory Report
Memorial Park
Cupertino, CA
Introduction and Overview
David J. Powers & Associates, Inc. in conjunction with Gates+Associates are developing a Master Plan for Memorial Park in Cupertino, CA. HortScience | Bartlett Consulting (Divisions of The F.A. The Bartlett Expert Tree Company) was asked to prepare a Tree Inventory Report for trees at this location to assist with planning and future development.
This report provides the following information:
1. An assessment of the health and structural condition of the trees within the park’s boundary area based on a visual inspection from the ground.
2. Preliminary guidelines for tree preservation during the design, construction, and maintenance phases of development.
Assessment Methods
Trees were assessed on September 2, 14, and 28, 2022. Tree assessment included trees with diameters of 4 inches or greater located within the boundaries provided by the client. The assessment procedure consisted of the following steps:
1. Identifying the tree species.
2. T agging trees and recording locations on a map.
3. Measuring the trunk diameter at a point 54 inches above grade.
4. Evaluating the health and structural condition using a scale of 1 – 5:
5 - A healthy, vigorous tree, reasonably free of signs and symptoms of disease, with good structure and form typical of the species.
4 - Tree with slight decline in vigor, small amount of twig dieback, minor str uctural defects that could be corrected.
3 - Tree with moderate vigor, moderate twig and small branch dieback, thinning of crown, poor leaf color, moderate structural defects that might be mitigated with regular care.
2 - Tree in decline, epicormic growth, extensive dieback of medium to large branches, significant structural defects that cannot be abated. 1 - Tree in severe decline, dieback of scaffold branches and/or trunk; most of foliage from epicormics; extensive structural defects that cannot be abated.
5. Rating the suitability for preservation as “high”, “moderate” or “low”. Suitability for preservation considers the health, age and structural condition of the tree, and its potential to remain an asset to the site for years to come.
High: Trees with good health and structural stability that have the potential for longevity at the site.
Moderate: Trees with somewhat declining health and/or structural defects than can be abated with treatment. The tree will require more intense management and monitoring, and may have shorter life span than those in ‘high’ category.
Low: Trees in poor health or with significant structural defects that cannot be mitigated. Tree is expected to continue to decline, regardless of treatment. The species or individual may have characteristics that are undesirable for landscapes, and generally are unsuited for use areas. -
B-6 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 2 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Description of Trees
Five hundred sixty (560) trees representing thirty-four species were assessed (Table 1). Overall, 357 trees were in good condition, 148 were in fair condition, 53 were in poor condition, and two were dead. In general species were ornamental, non-native and commonly observed in the region. While coast redwood, coast live oak, and western sycamore are native to the area, trees were not indigenous to the site. Trees #340, 370 and 371 were located off-site but were included because their canopy overhung the western park boundary. Descriptions of each tree can be found in the Tree Assessment Form and approximate locations are shown on the Tree Inventory Map (see Attachments).
Memorial Park is a 28-acre public park with open grass fields, sports courts, pedestrian pathways, playground, amphitheater, picnic areas, and other public amenities including Quinlan Community Center and Cupertino Sports Center. The landscape varied from irrigated turf with lush redwoods to dry non-irrigated hillsides.
Coast redwood was the most common species with
191 trees (34% of the population). One hundred
eleven (111) trees were in good condition (58%) with a
full healthy crown. The remaining redwoods (42%)
were in fair (63 trees) and poor (15 trees) condition,
and trees #399 and 429 were dead. Age and size
ranged from young to mature and from 5 to 60 inches
in diameter. In general, the trees in good condition
were growing in irrigated turf (PPhoto 1). Many of the trees in fair and poor condition were suffering from
drought stress with moderate to extreme canopy
dieback (PPhoto 2). Coast redwoods are not drought
tolerant and will show signs of water stress if
supplemental irrigation is not provided. Redwoods in
fair condition may recover from drought if adequate
irrigation is applied.
Photo 1. (above) Redwood #445
was growing in irrigated turf and was
in good condition with a full healthy
crown.
Photo 2. (right) Redwoods #360 –
364 (pictured left to right) were water
stressed and had sparse crowns.
-
Appendix B Tree Inventory Report B-7
Tree Inventory Report. Memorial Park, Cupertino. Page 3 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Table 1: Tree condition and frequency of occurrence.
Memorial Park. Cupertino, CA.
Common Name Scientific Name Condition Total
Dead
(0)
Poor
(1-2)
Fair
(3)
Good
(4-5)
Red maple Acer rubrum - - - 19 19
African fern-pine Afrocarpus falcatus - - 11 9 20
Silk tree Albizia julibrissin - - - 3 3
Blue atlas cedar Cedrus atlantica 'Glauca' - - - 1 1
Deodar cedar Cedrus deodara - - 3 18 21
Red ironbark Eucalyptus sideroxylon - - 1 - 1
Raywood ash Fraxinus angustifolia 'Raywood' - - 1 4 5
Evergreen ash Fraxinus uhdei - - - 8 8
Honey locust Gleditsia triacanthos - 7 7 - 14
Leyland cypress x Hesperotropis leylandii - - 1 - 1
California black walnut Juglans hindsii - 14 2 - 16
Hollywood juniper Juniperus chinensis 'Kaizuka' - 2 3 - 5 Crape myrtle Lagerstroemia indica - - - 2 2
Crabapple Malus sylvestris - - 1 - 1
Photinia Photinia fraseri - - 2 - 2
Canary Island pine Pinus canariensis - - 2 22 24
Italian stone pine Pinus pinea - - 8 3 11
Monterey pine Pinus radiata - 1 - - 1
Scot's pine Pinus sylvestris - 2 2 - 4
Chinese pistache Pistacia chinensis - - 4 21 25
Tobira Pittosporum tobira - - 2 - 2
Western sycamore Platanus racemosa - - 1 3 4
London plane Platanus x hispanica - - 1 6 7
Purpleleaf plum Prunus cerasifera - - - 12 12
Jap. flowering cherry Prunus serrulata - 7 1 18 26
Callery pear Pyrus calleryana - - 14 46 60
Evergreen pear Pyrus kawakamii - 2 8 2 12
Coast live oak Quercus agrifolia - - 6 32 38
Holly oak Quercus ilex - - - 1 1
Southern live oak Quercus virginiana - 2 1 2 5
Coast redwood Sequoia sempervirens 2 15 63 111 191
Chinese elm Ulmus parvifolia - - 2 9 11
Mexican fan palm Washingtonia robusta - - - 1 1
Sawleaf zelkova Zelkova serrata - 1 1 4 6
Total 2 53 148 357 560
-
B-8 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 4 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Callery pear was the next most common species with 60 trees representing 10% of the population. Trees were in good (46 trees) and fair (14) condition. Most of the pears (40 trees) were located along the perimeter of a grassy field with the remainder in parking lot planting strips and scattered throughout the park. Pears were young to semi-mature in development with an average diameter of 14 inches.
Thirty-two of 38 coast live oaks
were in good condition and six
trees were fair. Age and size
ranged from young to mature
with diameters from 7 to 59
inches. Tree #338 was the
largest and most mature of the
oaks. It had a full healthy crown
and areas of decay on the trunk
and branches (Photo 3).
Japanese flowering cherries
comprised approximately 4% of the
population (26 trees). Trees were
young with an average diameter of
four inches. The cherries were in
good (18 trees) and poor (7 trees)
condition with tree #331 in fair.
Many of the cherries had marginal
leaf burn from a period of recent
high temperatures (Photo 4).
Of 26 Chinese pistaches, 21 were in good condition with four in fair condition. Trees were young to semi-mature in development with an average diameter of seven inches. In general, trees had good structure and a full round crown.
Most (91%) of the 24 Canary Island pines were in good condition (22 trees), with two in fair condition. Age and size ranged from young to mature with diameter from 8 to 28 inches. Trees had good structure and upright columnar form typical of the species.
Photo 3. (right) Coast live oak
#338 was a striking mature
tree. Despite areas of decay in
the trunk and branches, it had a
full healthy crown.
Photo 4. A recent period of high
temperatures caused leaf burn
in many of the Japanese
flowering cherries (tree #274).
-
Appendix B Tree Inventory Report B-9
Tree Inventory Report. Memorial Park, Cupertino. Page 5 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Twenty-one (21) deodar
cedars were located around
the Sports Center tennis
courts. Trees were young to
semi-mature in development.
Size ranged from four to 26
inches in diameter. Most of
the cedars were in good
condition (18 trees) with three
trees in fair condition.
African fern-pines comprised
approximately 3% of the
population (20 trees). Half
(10 trees) were located
around Quinlan Community
Center and half (10 trees)
were located in the Sports
Center parking lot (Photo 5).
Trees were young to semi-
mature with an average
diameter of 14 inches. Nine
(9) trees were in good
condition with 11 trees fair.
Nineteen (19) red maples were
located around the Veteran’s
Memorial. The maples were
young with an average diameter
of eight inches. All trees were in
good condition with a full
healthy crown.
Sixteen (16) California black
walnuts were located around the
playground. Most (14 trees)
were in poor condition with
moderate to severe twig and
branch dieback. Two trees
were in fair condition (Photo 6).
Age and size ranged from semi-
mature to mature with diameter
from 12 to 38 inches.
Honey locusts (14 trees) were
located around a group picnic
area. Trees were young with an
average diameter of seven
inches. Half (7 trees) were in
fair condition and half (7 trees)
were in poor condition with
extensive trunk wounds and
basal decay.
Photo 5. (above) African fern-pines #102 – 104 (pictured left to right) were located around Quinlan Community Center.
Tree #104 had a slightly chlorotic but full crown, while trees #102 & 103 had thinner crowns.
Photo 6. California black walnut #449 was in poor
condition with significant twig and branch dieback.
B-10 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 6 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Purpleleaf plums (12 trees) were in a semi-circle west of the Community Center building. The plums were in good condition with a full healthy crown. Trees were young in development with an average diameter of six inches.
Twelve (12) evergreen pears were present. Trees were young to semi-mature, and diameter ranged from five to 14 inches. Most pears were in fair (8 trees) condition with two trees in fair and poor condition respectively.
Italian stone pines were in
fair (8 trees) and good (3
trees) condition. Trees
were semi-mature to
mature in development with
an average trunk diameter
of 25 inches. Seven pines
had large codominant
stems. Tree #421 had
large heavy lateral
branches that extended
over the baseball field’s
bleachers (Photo 7).
Eleven (11) Chinese elms were located
around the west entrance to the
Community Center and along Anton
Way. Trees were in good (9 trees) and
fair (2 trees) condition. The young
trees had an average trunk diameter of
six inches.
Evergreen ashes were in good (8 trees)
condition with a vigorous full crown
(Photo 8). Trees were semi-mature to
mature in development with diameters
ranging from 14 to 38 inches. Ashes
were located around the newly filled-in
pond (6 trees) and adjacent to the
playground (2 trees).
Photo 8. Evergreen ash #276 was in
good condition and had a full
vigorous crown.
Photo 7. Italian stone
pine #421 was a
mature tree with
codominant trunks and
large lateral branches
that hung over the
baseball bleachers.
-
Appendix B Tree Inventory Report B-11
Tree Inventory Report. Memorial Park, Cupertino. Page 7 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Six of seven London planes were in good condition with a full healthy crown. Tree #479 was fair condition with a slightly sparse crown. Trees were semi-mature in development with an average diameter of 14 inches.
Four (4) sawleaf zelkova were in
good condition, tree #262 was
fair, and tree #345 was poor.
Trees were semi-mature to
mature in development with
diameters ranging from 13 to 25
inches. Multiple branch
attachments arose between 5
and 8 feet on the trees. Tree
#263 was an especially beautiful
tree with a dense wide-
spreading crown (Photo 9).
Hollywood junipers were in fair (3 trees) and
poor (2 trees) condition. The average trunk
diameter was 13 inches. Trees were small in
stature with an average height of 13 feet.
Four (4) Raywood ash were in good condition
with a full healthy crown. Tree #309 was fair
with dieback on the north side. Age and size
ranged from young to semi-mature and from 4
to 11 inches in diameter.
Southern live oaks (5 trees) were located
along Stevens Creek Boulevard. Trees were
in good (2 trees) and poor (2 trees) condition,
and tree #504 was fair. Oaks were young to
semi-mature with an average diameter of 10
inches.
Scot’s pines (4 trees) were located along
Anton Way. The average diameter was 10
inches. Trees were in fair (2 trees) and poor
(2 trees) condition and were water stressed
with small to significant needle dieback.
Four (4) western sycamore were growing in
parking lot planters. Age and size ranged
from young to semi-mature and from seven to
24 inches in diameter. Three (3) trees were
in good condition with a fully healthy crown.
Tree #353 was fair with a thin sinuous central
leader. The sycamores had large surface
roots typical of unsuitable soil conditions
(Photo 10).
Photo 9. (right) Sawleaf
zelkova #263 was a striking
tree with a dense wide-
spreading crown.
Photo 10. Western sycamore #353 was
growing in a parking lot planter. It had a thin
sinuous central leader and large surface
roots.
B-12 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 8 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Three (3) silk trees were growing in a parking lot planting strip. Trees were in good condition with a full healthy crown. They were young with an average diameter of seven inches (Photo 11).
The remaining species were represented by two trees or fewer:
• Blue Atlas cedar #521 measured 12 inches in diameter and was in good condition.
• Crabapple #299 was in fair condition with basal and root decay. It was 12 inches in diameter.
• C rape myrtles #322 and 323 were young and in good condition.
• Holly oak #546 was in good condition with a fully healthy crown. It was semi-mature with multiple stems arising from the base.
• Leyland cypress #119 was in fair condition with small twig and branch dieback. It was semi-mature and measured 21 inches in diameter.
• Mexican fan palm #380 was mature in development. It was in good condition with a full healthy crown.
• Monterey pine #370 was in poor condition with significant twig and branch dieback. It was semi-mature with a diameter of 17 inches.
• P hotinias #348 and 350 were in fair condition. The young trees had an average diameter of 5 inches.
• Red ironbark #530 was mature in development with a diameter of 31 inches. The tree was in fair condition with a history of branch failures.
Photo 11. Silk trees #19 – 21 (pictured right to left) were good young trees with a dense vigorous crown.
-
Appendix B Tree Inventory Report B-13
Tree Inventory Report. Memorial Park, Cupertino. Page 9 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
• T obiras #351 and 352 were in fair condition. The young trees had a diameter of 7 inches.
The City of Cupertino protects private trees that meet certain criterion (Chapter 14.18.050), and all public trees (Chapter 14.12). According to City Ordinance 14.12, public tree is defined as park trees and street trees collectively; and park trees are defined as all woody vegetation in public parks owned by the City, or to which the public has access as a park. Based on this definition, all trees in Memorial Park are Protected.
Additionally, City Ordinance Chapter 14.18.050 protects Heritage trees in all zoning districts.
Heritage trees have an identification tag on them which designates their status (Chapter
14.18.090). Based on this designation, no tree in Memorial Park has Heritage status.
Suitability for Preservation
Before evaluating the impacts that will occur during development, it is important to consider the quality of the tree resource itself, and the potential for individual trees to function well over an extended length of time. Trees that are preserved on development sites must be carefully selected to make sure that they may survive development impacts, adapt to a new environment and perform well in the landscape. Our goal is to identify trees that have the potential for long- term health, structural stability, and longevity within the proposed development.
Evaluation of suitability for preservation considers several factors:
Tree health
Healthy, vigorous trees are better able to tolerate impacts such as root injury, demolition of existing structures, changes in soil grade and moisture, and soil compaction than are non-vigorous trees. For example, coast redwoods with a full healthy crown will tolerate impacts from construction better than redwoods that are drought stressed.
Structural integrity
Trees with significant amounts of wood decay and other structural defects that cannot be corrected are likely to fail. Such trees should not be preserved in areas where damage to people or property is likely. For example, honey locust #238 had extensive trunk wounds and basal decay and had low suitability for preservation.
Species response
There is a wide variation in the response of individual species to construction impacts and changes in the environment. Coast redwood, Canary Island pine, and coast live oak are tolerant of root severance and general construction impacts while California black walnut is intolerant. Callery pear and Chinese pistache are moderate in response.
Tree age and longevity
Old trees, while having significant emotional and aesthetic appeal, have limited physiological capacity to adjust to an altered environment. Young to semi-mature coast live oaks would be better able to generate new tissue and to respond to change than mature oak #338.
Invasiveness
Species that spread across a site and displace desired vegetation are not always appropriate for retention. This is particularly true when indigenous species are displaced.
The California Invasive Plant Inventory Database (http://www.cal-ipc.org/paf/) lists species identified as being invasive. Cupertino is part of the Central West Floristic -
B-14 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 10 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Province. Of the assessed species, Mexican fan palm is moderately invasive and purpleleaf plum has limited invasiveness.
Each tree was rated for suitability for preservation based upon its age, health, structural condition, and ability to safely coexist within a development environment (Table 2). We consider trees with high suitability for preservation to be the best candidates for preservation. We do not recommend retention of trees with low suitability for preservation in areas where people or property will be present. Retention of trees with moderate suitability for preservation depends upon the intensity of proposed site changes.
Table 2: Tree suitability for preservation
Memorial Park. Cupertino, CA
High Trees in this category had good health and structural stability that have the potential for longevity at the site. Two hundred ninety-three (293) trees had high suitability for preservation: 114 coast redwoods, 34 coast live oaks, 24 Chinese pistaches, 19 red maples, 13 Japanese flowering cherries, 12 purpleleaf plums, African fern-pines #16, 17, 52, 56, 65, and 102 – 104; evergreen ashes #176, 382 – 386, 447, and 448; London planes #297, 298, 314, 329, 337, and 339; western sycamores #354 – 357; Callery pears #305 and 537, Chinese elms #488 and 489, crape myrtles #322 and 323, evergreen pears #315 and 534, Italian stone pine #484, sawleaf zelkova #261 and 263, Leyland cypress #119, Mexican fan palm #380, and Raywood ash #336.
Moderate Trees in this category have fair health and/or structural defects that may be abated with treatment. Trees in this category require more intense management and monitoring and may have shorter lifespans than those in the “high” category. One hundred seventy-two (172) trees had moderate suitability for preservation: 58 coast redwoods, 47 Callery pears, 10 African fern-pines, 10 Italian stone pines; Chinese elms #57 – 64 and 73; evergreen pears #341 – 343, 346, 347, and 349; Japanese flowering cherries #332, 375, 376, 485, and 486; sawleaf zelkovas #262, 275, and 344; silk trees #19 – 21; coast live oaks #434 and 442; Scot’s pines #469 and 487; Chinese pistache #12, London plane #479, and tobira #351.
Low Trees in this category are in poor health or have significant defects in structure that cannot be abated with treatment. These trees can be expected to decline regardless of management. The species or individual tree may possess either characteristics that are undesirable in landscape settings or be unsuited for use areas. Ninety-five (95) trees had low suitability for preservation: 19 coast redwoods, 16 California black walnuts, 14 honey locusts, 11 Callery pears, Japanese flowering cherries #69 – 72, 260, 300, 330, and 331; Hollywood junipers #473 - 475, 477, and 478; evergreen pears #547 – 550; African fern-pines #556 and 558; coast live oaks #369 and 441; photinias #348 and 350; Scots’ pines #467 and 468; crabapple #299, Monterey pine #370, Raywood ash #309, sawleaf zelkova #345, tobira #352, and western sycamore #353.
-
Appendix B Tree Inventory Report B-15
Tree Inventory Report. Memorial Park, Cupertino. Page 11 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Tree Preservation Guidelines
The goal of tree preservation is not merely tree survival during development but maintenance of tree health and beauty for many years. Trees retained on sites that are either subject to extensive injury during construction or are inadequately maintained become a liability rather than an asset.
The response of individual trees depends on the amount of excavation and grading, care with which demolition is undertaken, and construction methods. Coordinating any construction activity inside the T
REE PROTECTION ZONE can minimize these impacts.
The following recommendations will help reduce impacts to trees from development and maintain and improve their health and vitality through the clearing, grading and construction phases.
Tree Protection Zone
1. A
TREE PROTECTION ZONE shall be identified for each tree to be preserved on the Tree Protection Plan prepared by the project arborist.
a. Fence all trees to be retained to completely enclose the TREE PROTECTION ZONE prior to demolition, grubbing or grading. Fences shall be 6 ft. chain link with posts sunk into the ground or equivalent as approved by the City.
b. Fences must be installed prior to beginning demolition and must remain until construction is complete.
c. No grading, excavation, construction, or storage or dumping of materials shall occur within the T
REE PROTECTION ZONE.
d. No underground services including utilities, sub-drains, water, or sewer shall be placed in the TREE PROTECTION ZONE.
Design recommendations
1. Plot accurate locations of all trees to be preserved on all project plans. Identify the TREE PROTECTION ZONE for each tree. Focus on preserving trees that have high suitability for preservation.
2. Plan for tree preservation by designing adequate space around trees to be preserved. This is the TREE PROTECTION ZONE: No grading, excavation, construction, or storage of materials should occur within that zone. Route underground services including utilities, sub -drains, water, or sewer around the TREE PROTECTION ZONE. For design purposes, the TREE PROTECTION ZONE trees shall be defined as the tree dripline.
3. Consider the vertical clearance requirements near trees during design. Avoid designs that would require pruning more than 20% of a tree’s canopy.
4. All plans affecting trees shall be reviewed by the Consulting Arborist with regard to tree impacts. These include, but are not limited to, demolition plans, grading plans, drainage plans, utility plans, and landscape and irrigation plans.
5. Tree Preservation Guidelines prepared by the Consulting Arborist, which include specifications for tree protection during demolition and construction, should be included on all plans.
6. Do not lime the subsoil within 50’ of any tree. Lime is toxic to tree roots.
7. As trees withdraw water from the soil, expansive soils may shrink within the root area.
Therefore, foundations, footings, and pavements on expansive soils near trees should be designed to withstand differential displacement.
-
B-16 Memorial Park Specific Plan
Tree Inventory Report. Memorial Park, Cupertino. Page 12 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
Pre-demolition and pre-construction treatments and recommendations
1. The demolition and construction superintendents shall meet with the Consulting Arborist before beginning work to review all work procedures, access routes, storage areas, and tree protection measures.
2. Fence all trees to be retained to completely enclose the T REE PROTECTION ZONE prior to
demolition, grubbing or grading. Fences shall be 6 ft. chain link with posts sunk into the ground or equivalent as approved by the City.
3. Fences are to remain until all grading and construction is completed.
4. Tree(s) to be removed that have branches extending into the canopy of tree(s) or located within the
TREE PROTECTION ZONE of tree(s) to remain shall be removed by a Certified Arborist or Certified Tree Worker and not by the demolition contractor. The Certified Arborist or Certified Tree Worker shall remove the trees in a manner that causes no damage to the tree(s) and understory to remain. Stumps shall be ground below grade.
Summary
Five hundred sixty (560) trees representing thirty-four species were assessed. Coast redwood was the most common species with 191 trees (34% of the population). Tree condition varied by species. Overall, 357 trees were in good condition, 148 were in fair condition, 53 were in poor condition, and two were dead. Trees age ranged from young to mature in development. Tree size ranged from 4 inches to 60 inches in diameter with an average of 17 inches.
In general, trees that are the best candidates for preservation are those in good condition with good to moderate suitability for preservation (354 trees). Trees in poor health with low suitability for preservation (55 trees) should be considered for removal. If trees are to be retained, it is imperative to provide sufficient irrigation to relieve the current water-stress of the coast redwoods.
Maintenance of impacted trees
Preserved trees will experience a physical environment different from that pre-development. As a result, tree health and structural stability should be monitored. Occasional pruning, fertilization, mulch, pest management, replanting and irrigation may be required. In addition, provisions for monitoring both tree health and structural stability following construction must be made a priority.
Inspect trees annually and following major storms to identify conditions requiring treatment to manage risk associated with tree failure.
Our procedures included assessing trees for observable defects in structure. This is not to say that trees without significant defects will not fail. Failure of apparently defect-free trees does occur, especially during storm events. Wind forces, for example, can exceed the strength of defect-free wood causing branches and trunks to break. Wind forces coupled with rain can saturate soils, reducing their ability to hold roots, and blow over defect-free trees. Although we cannot predict all failures, identifying those trees with observable defects is a critical component of enhancing public safety.
Furthermore, trees change over time. Our inspections represent the condition of the tree at the time of inspection. As trees age, the likelihood of failure of branches or entire trees increases .
Annual tree inspections are recommended to identify changes to tree health and structure. In addition, trees should be inspected after storms of unusual severity to evaluate damage and structural changes. Initiating these inspections is the responsibility of the client and/or tree owner.
-
Appendix B Tree Inventory Report B-17
Tree Inventory Report. Memorial Park, Cupertino. Page 13 David J. Powers & Associates November 2022
HortScience | Bartlett Consulting, Divisions of The F. A. Bartlett Tree Expert Company
HortScience | Bartlett Consulting
Brenda Wong
Consulting Arborist and Urban Forester
ISA Certified Arborist WE12933A
ISA Tree Risk Assessment Qualified
-
B-18 Memorial Park Specific Plan
If you have any questions regarding my observations or recommendations, please contact me.
HortScience | Bartlett Consulting
Attachments
Tree Inventory Map
Tree Assessment Form
-
Appendix B Tree Inventory Report B-19
Tree Inventory Map
Memorial Park
Cupertino, CA
Prepared For:
David J. Powers &
Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
October 2022
2550 Ninth Street, Suite #112
Berkeley, California 94710
Phone 925.484.0211
Fax 925.484.0596
Ann Arbor Ct
Chr
iste
nsen Dr
Chr
istensen Dr
Chri
stensen Dr
200
201
202
203
204
205
206
232
233
234
235
236 237 238
239240
241
242
243
244
245
246
247
248
249
250
251 252
253
254
255
256
257
258
259
362
363
364
365 366
367
368
369
370
371
372
373 374
387
388 389
390
391
392
393
394
395
397 398
399
400
401
402
404
406405
407403
408
409
410 411
412
413
414
415
416 417
418
419
420
421
422
423
424
396
Esri Community Maps Contributors, City of Cupertino, City of San Jose, County of Santa Clara, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Santa Clara County, Maxar, Microsoft
¯
0 50 10025 Feet
Trees
Notes:
-Basemap provided by ESRI
-Tree locations are approximate
0 BARTLETT CONSULTING
I
B-20 Memorial Park Specific Plan
Tree Inventory Map
Memorial Park
Cupertino, CA
Prepared For:
David J. Powers &
Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
October 2022
2550 Ninth Street, Suite #112
Berkeley, California 94710
Phone 925.484.0211
Fax 925.484.0596
Memorial Park
Anton Way Anton Way
149
150
151
152
153
232
233
234
235
236 237 238
239240
241
242
243
244
245
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274275
276
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365 366
367
368
369
370
371
372
373 374
375
376
377382
383
384
385
386
Esri Community Maps Contributors, City of Cupertino, City of San Jose, County of Santa Clara, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Santa Clara County, Maxar, Microsoft
¯
0 50 10025 Feet
Trees
Notes:
-Basemap provided by ESRI
-Tree locations are approximateI
0 BARTLETT CONSULTING
Appendix B Tree Inventory Report B-21
Tree Inventory Map
Memorial Park
Cupertino, CA
Prepared For:
David J. Powers &
Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
October 2022
2550 Ninth Street, Suite #112
Berkeley, California 94710
Phone 925.484.0211
Fax 925.484.0596
Mary Ave
Senior Center
An ton Way
Anton Way Anton Way Anton Way
273
274275
276
277
278
279
280
281
282
283284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308309
310
311
312
313
314
315
316
317
318
319320321
322323
324325
326
327
328
329
330
331 332
333 334
335
336337
338
339
340
341
342
343
344
345 375
376
377
378
379
380
381
382
425 426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442443
444
445446
447
448
449
450
451
452
453
454
455
466 456
457
461
458
459
460
462
463
464
465
467
468
469
470
471
472473
474
475
476
477
478
479 480
481
482
483
484
485
486 487
488
489
490
491
492
Esri Community Maps Contributors, City of Cupertino, City of San Jose, County of Santa Clara, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Santa Clara County, Maxar, Microsoft
¯
0 60 12030 Feet
Trees
Notes:
-Basemap provided by ESRI
-Tree locations are approximate
0 BARTLETT CONSULTING
I
B-22 Memorial Park Specific Plan
Tree Inventory Map
Memorial Park
Cupertino, CA
Prepared For:
David J. Powers &
Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
October 2022
2550 Ninth Street, Suite #112
Berkeley, California 94710
Phone 925.484.0211
Fax 925.484.0596
Chris
ten
sen D
r
Fenway
Ct
Christensen Dr
Alves
Dr
CongressPl
Lauretta Dr
Christensen Dr
Quinlan
Community
Center
Alves Dr
Alves Dr
12 3
4 56789
10 11
12 13 14
15 16
17 18 19
20 21
22 23
24 25
26 27
28 2930
31 32
333435
36 37
38 39
4041
4243
44 45464748
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 646566
67 68
69 70
71 72
73 74
75 76 77
78 79
80 81
82 83
84 85
86 87
88 89
90 91
92 93
9495
96 97
98 99
100
101
102103
104
105 106
107
108
109
110 111
112
113114
115
116 117
118
119120
121
122
122124
125
126
127128
2930
131
132
133
134
135
136
137
138
139140141
142
143
144
145
146147
148
154
155
156
157
158
159
160
161
162
163
164 165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195196
197
198199
207 208
209
210 211 212
213
214
215
216 217
218
219 220
221
222223
224
225
226227
228
229
230
231
Esri Community Maps Contributors, City of Cupertino, City of San Jose, County of Santa Clara, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Santa Clara County, Maxar, Microsoft
¯
0 75 15037.5 Feet
Trees
Notes:
-Basemap provided by ESRI
-Tree locations are approximateI
0 BARTLETT CONSULTING
Appendix B Tree Inventory Report B-23
Tree Inventory Map
Memorial Park
Cupertino, CA
Prepared For:
David J. Powers &
Associates, Inc.
1871 The Alameda, Suite 200
San Jose, CA 95126
October 2022
2550 Ninth Street, Suite #112
Berkeley, California 94710
Phone 925.484.0211
Fax 925.484.0596
Congress Pl
Freed
om
Dr
Anton Way
Patriot Way
Sports and
Teen Center
Anton Way
Stevens Creek BlvdStevens Creek Blvd
United Pl
Senate Way
Patr
iot Way
Stevens Creek BlvdStevens Creek Blvd
488
489
490
491
492
493
494
495
496
497 498
499 500 501 502
503 504 505 506 507 508
509
510
511 512
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528529
530
531
532533534
535
536
537
538
539
540
541
542543544545
546
547548549550551552
553
554 555
556
557
558
559
560
513
Esri Community Maps Contributors, City of Cupertino, City of San Jose, County of Santa Clara, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Santa Clara County, Maxar, Microsoft
¯
0 75 15037.5 Feet
Trees
Notes:
-Basemap provided by ESRI
-Tree locations are approximate
0 BARTLETT CONSULTING
I
B-24 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
1 Callery pear 20 Yes 3 25 45 Moderate Surface roots; poor structure; multiple attachments @ 6’; 25.
2 Coast redwood 25 Yes 3 70 22 High Surface roots; good upright form & structure; small leaf dieback.
3 Coast redwood 22 Yes 3 70 24 High Surface roots; good upright form & structure; small leaf dieback.
4 Coast redwood 23 Yes 3 70 24 High Surface roots; good upright form & structure; small leaf dieback.
5 Coast redwood 22 Yes 2 70 24 Low Surface roots; good upright form & structure; significant canopy dieback.
6 Coast redwood 21 Yes 3 70 25 High Surface roots; good upright form & structure; small leaf dieback.
7 Coast redwood 25 Yes 3 70 26 High Surface roots; good upright form & structure; small leaf dieback.
8 Coast redwood 24 Yes 3 70 26 High Surface roots; good upright form & structure; small leaf dieback.
9 Coast redwood 24 Yes 3 70 26 High Surface roots; good upright form & structure; small leaf dieback.
10 Callery pear 18 Yes 3 25 28 Moderate Surface roots; poor structure; multiple attachments @ 6’.
11 Coast redwood 11 Yes 4 30 18 Moderate Surface roots; good upright form & structure; small leaf dieback.
12 Chinese pistache 8 Yes 4 20 30 Moderate Large surface roots; good structure; full healthy crown.
Tree Assessment
Memorial Park
Cupertino CA
October 2022
I
Appendix B Tree Inventory Report B-25
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
13 Chinese pistache 7 Yes 4 15 28 High Large surface roots; good structure; full healthy crown.
14 Chinese pistache 6 Yes 4 15 20 High Multiple attachments @ 6’; full healthy crown.
15 African fern-pine 15 Yes 3 30 25 Moderate Multiple attachments @ 6’; chlorotic crown; good form & structure.
16 African fern-pine 14 Yes 3 30 25 High Multiple attachments @ 6’; good form & structure; small twig dieback.
17 African fern-pine 22 Yes 4 40 36 High Multiple attachments @ 6’; good form & structure; full healthy crown.
18 Coast redwood 22 Yes 4 40 28 High Good upright form & structure; full healthy crown.
19 Silk tree 6 Yes 4 12 14 Moderate Multiple attachments @ 6’; healthy crown.
20 Silk tree 7 Yes 4 12 24 Moderate Multiple attachments @ 6’; healthy crown.
21 Silk tree 8 Yes 4 12 20 Moderate Multiple attachments @ 6’; full healthy crown.
22 Callery pear 15 Yes 4 20 36 Moderate Surface roots; poor structure; multiple attachments @ 6’.
23 Callery pear 18 Yes 4 25 40 Moderate Surface roots; poor structure; multiple attachments @ 6’; healthy crown.
24 Coast redwood 17 Yes 3 40 20 High Surface roots; good upright form & structure; small twig & leaf dieback.
B-26 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
25 Coast redwood 23 Yes 3 40 25 Low Surface roots; dead central leader; otherwise healthy crown.
26 Coast redwood 24 Yes 4 60 30 High Group of 5; surface roots; good upright form & structure; full healthy crown.
27 Coast redwood 25 Yes 4 60 22 High Group of 5; surface roots; good upright form & structure; full healthy crown.
28 Coast redwood 22 Yes 4 60 24 High Group of 5; good upright form & structure; full healthy crown.
29 Coast redwood 28 Yes 5 60 30 High Good upright form & structure; full healthy canopy.
29 Coast redwood 25 Yes 4 65 28 High Group of 5; good upright form & structure; small top dieback; otherwise
full healthy crown.
30 Coast redwood 23 Yes 5 60 24 High Good upright form & structure; full healthy canopy.
30 Coast redwood 28 Yes 4 65 34 High Group of 5; good upright form & structure; full healthy crown.
31 Callery pear 8 Yes 4 15 12 Low 5’ parking lot planter; surface roots; poor structure; multiple attachments @
6’; healthy crown.
32 Callery pear 10 Yes 4 15 18 Low 5’ parking lot planter; surface roots; poor structure; multiple attachments @
6’; healthy crown.
I
Appendix B Tree Inventory Report B-27
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
33 Callery pear 11 Yes 4 20 28 Low 5’ parking lot planter; surface roots; poor structure; multiple attachments @
6’; healthy crown.
34 Callery pear 10 Yes 3 20 25 Low 5’ parking lot planter; poor structure; multiple attachments @ 6’; sparse
crown.
35 Chinese pistache 7 Yes 4 15 30 High Surface roots; good structure; full healthy crown.
36 Chinese pistache 7 Yes 4 20 15 High Surface roots; suppressed; small twig dieback.
37 Coast redwood 5 Yes 4 15 14 High Surface circling roots; good upright form & structure; full healthy canopy.
38 Coast redwood 26 Yes 4 65 26 High Group of 4; good upright form & structure; full healthy canopy.
39 Coast redwood 18 Yes 4 50 22 High Group of 4; surface roots; good upright form & structure; full healthy canopy.
40 Coast redwood 27 Yes 4 65 30 High Group of 4; surface roots; good upright form & structure; full healthy canopy.
41 Coast redwood 24 Yes 4 65 28 High Group of 4; surface roots; good upright form & structure; small top dieback;
otherwise full healthy canopy.
B-28 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
42 Coast redwood 26 Yes 4 65 30 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
43 Coast redwood 31 Yes 4 65 30 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
44 Coast redwood 29 Yes 4 65 32 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
45 Coast redwood 25 Yes 4 65 28 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
46 Coast redwood 24 Yes 4 65 28 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
47 Coast redwood 26 Yes 4 65 32 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
48 Coast redwood 25 Yes 4 65 30 High Group of 8; surface roots; good upright form & structure; full healthy canopy.
49 Chinese pistache 6 Yes 4 15 26 High Surface roots; suppressed; good structure; small twig dieback.
50 Chinese pistache 8 Yes 4 15 30 High Surface roots; codominant trunks @ 6’; small twig dieback.
I
Appendix B Tree Inventory Report B-29
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
51 Chinese pistache 5 Yes 4 15 25 High Surface roots; multiple attachments @ 6’; full healthy crown.
52 African fern-pine 18 Yes 4 35 28 High Multiple attachments @ 6’; narrow attachments; full healthy canopy.
53 Chinese pistache 6 Yes 3 15 18 High Surface roots; multiple attachments @ 5’; suppressed.
54 Chinese pistache 5 Yes 3 15 20 High Surface roots; multiple attachments @ 6’; suppressed.
55 Chinese pistache 8 Yes 4 20 22 High Surface roots; codominant trunks @ 7’; healthy crown.
56 African fern-pine 15 Yes 4 35 32 High Multiple attachments @ 6’; narrow attachments; full slightly chlorotic
canopy.
57 Chinese elm 4 Yes 3 12 18 Moderate Codominant trunks @ 5’; small twig dieback.
58 Chinese elm 5 Yes 3 12 18 Moderate Codominant trunks @ 5’; small twig dieback.
59 Chinese elm 7 Yes 4 15 26 Moderate Multiple attachments @ 6’; healthy crown.
60 Chinese elm 6 Yes 4 15 20 Moderate Multiple attachments @ 6’; healthy crown.
61 Chinese elm 7 Yes 4 15 25 Moderate Multiple attachments @ 6’; healthy crown.
62 Chinese elm 5 Yes 4 12 24 Moderate Codominant trunks @ 5’; healthy crown.
B-30 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
63 Chinese elm 6 Yes 4 12 20 Moderate Codominant trunks @ 5’; small twig dieback.
64 Chinese elm 6 Yes 4 12 25 Moderate Multiple attachments @ 6’; small twig dieback.
65 African fern-pine 16 Yes 4 25 24 High Surface roots; multiple attachments @ 5’; full crown.
66 Chinese pistache 9 Yes 4 20 22 High Large surface roots; codominant trunks @ 6’; full crown.
67 Chinese pistache 7 Yes 3 15 22 High Large surface roots; codominant trunks @ 6’; small twig dieback.
68 African fern-pine 16 Yes 3 25 26 Moderate Surface roots; multiple attachments @ 5’; narrow unions; slightly chlorotic
crown.
69 Japanese flowering cherry 5 Yes 2 10 12 Low Multiple attachments @ 3’; significant branch dieback.
70 Japanese flowering cherry 4 Yes 2 10 8 Low Codominant trunks @ 3’; significant branch dieback.
71 Japanese flowering cherry 4 Yes 2 10 6 Low Codominant trunks @ 3’; significant branch dieback.
72 Japanese flowering cherry 4 Yes 2 10 6 Low Codominant trunks @ 3’; significant branch dieback.
73 Chinese elm 6 Yes 4 15 24 Moderate Multiple attachments @ 6’; healthy crown.
74 Coast redwood 27 Yes 4 70 28 High Good upright form & structure; full healthy crown.
I
Appendix B Tree Inventory Report B-31
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
75 Coast redwood 22 Yes 4 70 24 High Surface roots; good upright form & structure; full healthy crown.
76 Coast redwood 24 Yes 4 70 28 High Surface roots; good upright form & structure; full healthy crown.
77 Coast redwood 24 Yes 4 70 40 High Surface roots; good upright form & structure; full healthy crown.
78 Coast redwood 24 Yes 4 70 28 High Surface roots; good upright form & structure; full healthy crown.
79 Coast redwood 23 Yes 4 70 20 High Surface roots; good upright form & structure; full healthy crown.
80 Coast redwood 19 Yes 3 70 20 High Surface roots; good upright form & structure; moderate leaf discoloration.
81 Coast redwood 17 Yes 3 70 20 High Surface roots; good upright form & structure; small leaf
discoloration/dieback.
82 Coast redwood 23 Yes 3 70 22 High Surface roots; good upright form & structure; small leaf
discoloration/dieback.
83 Coast redwood 22 Yes 2 70 24 Low Mostly dead.
84 Coast redwood 24 Yes 2 70 24 Low Severe canopy dieback. 85 Coast redwood 27 Yes 3 70 22 Moderate Good form & structure; moderate canopy dieback.
86 Coast redwood 22 Yes 3 70 22 Moderate Good upright form & structure; moderate canopy dieback.
B-32 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
87 Coast redwood 23 Yes 3 70 26 Moderate Good upright form & structure; moderate canopy dieback.
88 Coast redwood 22 Yes 3 70 26 Moderate Good upright form & structure; small canopy dieback.
89 Coast redwood 17 Yes 2 70 20 Low Good upright form & structure; moderate canopy dieback.
90 Coast redwood 21 Yes 2 70 24 Low Good upright form & structure; moderate canopy dieback.
91 Coast redwood 17 Yes 2 70 24 Low Good upright form & structure; significant canopy dieback.
92 Coast redwood 22 Yes 3 70 28 Moderate Good upright form & structure; moderate canopy dieback.
93 Coast redwood 19 Yes 2 70 20 Low Good upright form & structure; moderate canopy dieback.
94 Coast redwood 23 Yes 3 70 28 Moderate Good upright form & structure; moderate canopy dieback.
95 Coast redwood 17 Yes 3 70 22 Moderate Good upright form & structure; top dieback & moderate canopy dieback.
96 Chinese pistache 6 Yes 4 25 15 High Multiple attachments @ 6’; suppressed; healthy crown.
97 Chinese pistache 8 Yes 4 25 26 High Codominant trunks @ 6’; surface roots; suppressed; healthy crown.
98 Chinese pistache 8 Yes 4 20 28 High Multiple attachments @ 6’; full healthy canopy.
I
Appendix B Tree Inventory Report B-33
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
99 Chinese pistache 6 Yes 3 30 15 High Codominant trunks @ 7’; slight trunk lean; small twig dieback.
100 Chinese pistache 11 Yes 4 25 38 High Codominant trunks @ 6’; full healthy canopy.
101 Chinese pistache 7 Yes 4 20 30 High Codominant trunks @ 6’; full healthy canopy.
102 African fern-pine 15 Yes 3 30 30 High Multiple attachments @ 7’; full slightly chlorotic canopy.
103 African fern-pine 15 Yes 3 25 30 High Multiple attachments @ 4’; sparse canopy; moderate twig dieback.
104 African fern-pine 18 Yes 3 40 34 High Multiple attachments @ 6’; sparse canopy; moderate twig dieback.
105 Callery pear 7 Yes 3 12 12 Low Parking lot planting strip; multiple attachments @ 6’; poor structure;
sparse canopy.
106 Callery pear 7 Yes 3 15 18 Low Parking lot planting strip; multiple attachments @ 6’; poor structure;
healthy canopy.
107 Callery pear 9 Yes 3 15 16 Low Parking lot planting strip; multiple attachments @ 6’; poor structure;
healthy canopy.
108 Callery pear 20 Yes 4 30 40 Moderate Multiple attachments @ 7’; poor structure; full healthy canopy.
109 Coast redwood 26 Yes 4 60 24 High Group of 8; good upright form & structure; full healthy crown.
B-34 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
110 Coast redwood 25 Yes 4 70 25 High Group of 8; good upright form & structure; full healthy crown.
111 Coast redwood 25 Yes 4 70 30 High Group of 8; good upright form & structure; full healthy crown.
112 Coast redwood 25 Yes 4 70 28 High Group of 8; good upright form & structure; full healthy crown.
113 Coast redwood 24 Yes 3 70 28 High Group of 8; good upright form & structure; top dieback otherwise full
healthy crown.
114 Coast redwood 24 Yes 3 70 28 High Group of 8; good upright form & structure; top dieback otherwise full
healthy crown.
115 Callery pear 14 Yes 3 25 18 Low Multiple attachments @ 7’; poor structure; slight trunk lean; suppressed.
116 Coast redwood 26 Yes 4 70 30 High Group of 8; good upright form & structure; full healthy crown.
117 Coast redwood 29 Yes 4 70 28 High Group of 8; good upright form & structure; full healthy crown.
118 Callery pear 17 Yes 3 30 30 Low Multiple attachments @ 7’; poor structure; slight trunk lean.
119 Leyland cypress 21 Yes 3 35 30 High Surface roots; small branch flagging & leaf dieback; poor structure.
120 Callery pear 13 Yes 3 30 25 Low Surface roots; multiple attachments @ 8’; poor structure.
I
Appendix B Tree Inventory Report B-35
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
121 Coast redwood 26 Yes 3 60 28 Moderate Group of 7; good upright form & structure; small twig dieback.
122 Coast redwood 19 Yes 3 60 28 Moderate Group of 7; good upright form & structure; small twig dieback.
122 Coast redwood 21 Yes 3 60 26 Moderate Group of 7; good upright form & structure; sparse canopy.
124 Coast redwood 20 Yes 3 60 26 Moderate Group of 7; good upright form & structure; moderate twig & leaf
dieback.
125 Coast redwood 22 Yes 3 60 26 High Group of 7; good upright form & structure; moderate twig & leaf
dieback.
126 Coast redwood 22 Yes 3 60 24 Moderate Group of 7; good upright form & structure; moderate twig & leaf
dieback.
127 Coast redwood 25 Yes 3 60 28 Moderate Group of 7; good upright form & structure; moderate twig & leaf
dieback.
128 Coast redwood 24 Yes 5 60 28 High Good upright form & structure; full healthy canopy.
131 Coast redwood 25 Yes 5 60 28 High Good upright form & structure; full healthy canopy; displacing hardscape.
132 Coast redwood 18 Yes 5 50 28 High Good upright form & structure; full healthy canopy.
B-36 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
133 Coast redwood 17 Yes 5 50 26 High Good upright form & structure; full healthy canopy.
134 Coast redwood 18 Yes 5 50 22 High Good upright form & structure; full healthy canopy.
135 Coast redwood 17 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
136 Coast redwood 17 Yes 5 50 22 High Good upright form & structure; full healthy canopy.
137 Coast redwood 15 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
138 Coast redwood 16 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
139 Coast redwood 18 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
140 Coast redwood 18 Yes 5 50 22 High Good upright form & structure; full healthy canopy.
141 Coast redwood 18 Yes 5 50 22 High Good upright form & structure; full healthy canopy.
142 Coast redwood 16 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
143 Coast redwood 15 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
144 Coast redwood 18 Yes 5 50 20 High Good upright form & structure; full healthy canopy.
I
Appendix B Tree Inventory Report B-37
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
145 Coast redwood 16 Yes 5 50 18 High Surface root; good upright form & structure; full healthy canopy.
146 Coast redwood 17 Yes 5 50 18 High Good upright form & structure; full healthy canopy.
147 Coast redwood 22 Yes 5 50 18 High Good upright form & structure; full healthy canopy; displacing hardscape.
148 Coast redwood 24 Yes 5 50 28 High Good upright form & structure; full healthy canopy.
149 Coast redwood 18 Yes 2 50 18 Low Good upright form & structure; sparse canopy; significant dieback.
150 Coast redwood 26 Yes 4 60 22 High Good upright form & structure; small twig dieback.
151 Coast redwood 29 Yes 4 60 24 High Good upright form & structure; roots displacing sidewalk; small growing
space 4’; small twig dieback.
152 Coast redwood 21 Yes 4 60 22 High Surface roots; good upright form & structure; small twig dieback.
153 Coast redwood 24 Yes 4 60 22 High Good upright form & structure; multiple attachments; small twig dieback.
154 Callery pear 22 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; full healthy canopy.
155 Callery pear 18 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; full healthy canopy.
B-38 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
156 Callery pear 14 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; full healthy canopy.
157 Callery pear 17 Yes 4 35 30 Moderate Surface roots; multiple attachments @ 6’; history of branch failure.
158 Callery pear 18 Yes 4 35 30 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
159 Callery pear 18 Yes 4 35 30 Moderate Surface roots; multiple attachments @ 6’; history of branch failure.
160 Callery pear 18 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
161 Callery pear 15 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
162 Callery pear 15 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
163 Callery pear 18 Yes 4 35 30 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
164 Callery pear 17 Yes 4 35 30 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
165 Callery pear 16 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
166 Callery pear 11 Yes 3 35 22 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; suppressed.
I
Appendix B Tree Inventory Report B-39
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
167 Callery pear 15 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions.
168 Callery pear 17 Yes 4 35 25 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
169 Purpleleaf plum 5 Yes 4 18 12 High Multiple attachments @ 5’; full healthy canopy.
170 Purpleleaf plum 6 Yes 4 18 20 High Small surface roots; multiple attachments @ 5’; full healthy canopy.
171 Purpleleaf plum 6 Yes 4 18 16 High Small surface roots; multiple attachments @ 5’; full healthy canopy.
172 Purpleleaf plum 6 Yes 4 18 20 High Small surface roots; multiple attachments @ 5’; full healthy canopy.
173 Purpleleaf plum 6 Yes 4 18 16 High Small surface roots; multiple attachments @ 5’; full healthy canopy.
174 Purpleleaf plum 7 Yes 4 18 18 High Small surface roots; multiple attachments @ 5’; full healthy canopy.
175 Purpleleaf plum 6 Yes 4 18 18 High Small surface roots; small trunk wound; multiple attachments @ 6’; full healthy
canopy.
B-40 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
176 Purpleleaf plum 7 Yes 4 18 14 High Small surface roots; multiple attachments @ 6’; narrow branch
union; full healthy canopy.
177 Purpleleaf plum 7 Yes 4 18 14 High Small surface roots; multiple attachments @ 6’; narrow branch
unions; full healthy canopy.
178 Purpleleaf plum 7 Yes 4 18 16 High Small surface roots; multiple attachments @ 6’; narrow branch
unions; full healthy canopy.
179 Purpleleaf plum 6 Yes 4 18 12 High Small surface roots; multiple attachments @ 6’; narrow branch
unions; full healthy canopy.
180 Purpleleaf plum 7 Yes 4 18 14 High Small surface roots; multiple attachments @ 6’; narrow branch
unions; full healthy canopy.
181 Chinese pistache 14 Yes 5 20 34 High Surface roots; good structure; multiple attachments @ 6’; full healthy canopy.
182 Chinese pistache 10 Yes 4 20 25 High Surface roots; good structure; multiple attachments @ 6’; small twig & branch
dieback.
183 Coast redwood 16 Yes 4 40 10 High Surface roots; good upright form & structure; full healthy canopy.
184 Coast redwood 30 Yes 5 65 24 High Surface roots; good upright form & structure; full healthy canopy.
I
Appendix B Tree Inventory Report B-41
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
185 Coast redwood 30 Yes 5 65 25 High Surface roots; good upright form & structure; full healthy canopy.
186 Coast redwood 30 Yes 5 65 25 High Surface roots; good upright form & structure; full healthy canopy.
187 Coast redwood 30 Yes 5 65 24 High Surface roots; good upright form & structure; full healthy canopy.
188 Coast redwood 15 Yes 4 45 16 High Surface roots; good upright form & structure; small twig & branch dieback.
189 Coast redwood 26 Yes 5 65 22 High Surface roots; good upright form & structure; full healthy canopy.
190 Coast redwood 31 Yes 5 65 25 High Surface roots; good upright form & structure; full healthy canopy.
191 Coast redwood 29 Yes 5 65 26 High Surface roots; good upright form & structure; full healthy canopy.
192 Coast redwood 25 Yes 5 65 28 High Surface roots; good upright form & structure; full healthy canopy.
193 Coast redwood 30 Yes 5 65 28 High Surface roots; good upright form & structure; full healthy canopy.
194 Coast redwood 23 Yes 5 65 24 High Surface roots; good upright form & structure; full healthy canopy.
195 Coast redwood 20 Yes 5 55 22 High Surface roots; good upright form & structure; full healthy canopy.
196 Coast redwood 13 Yes 5 45 20 High Surface roots; good upright form & structure; full healthy canopy.
B-42 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
197 Coast redwood 25 Yes 5 65 26 High Surface roots; good upright form & structure; full healthy canopy.
198 Coast redwood 27 Yes 5 65 30 High Surface roots; good upright form & structure; full healthy canopy.
199 Coast redwood 23 Yes 3 65 26 High Surface roots; good upright form & structure; small twig & branch top
dieback.
200 Coast redwood 23 Yes 5 65 28 High Surface roots; good upright form & structure; full healthy canopy.
201 Coast redwood 24 Yes 5 65 28 High Surface roots; good upright form & structure; full healthy canopy.
202 Callery pear 9,5 Yes 3 25 25 Low Surface roots; codominant trunks @ base & 6’; fire blight.
203 Chinese pistache 8 Yes 5 20 20 High Surface roots; good form & structure; multiple attachments @ 6’; full healthy
canopy.
204 Chinese pistache 7 Yes 5 20 10 High Surface roots; good form & structure; multiple attachments @ 6’; full healthy
canopy.
205 Coast redwood 22 Yes 5 65 28 High Surface roots; good upright form & structure; full healthy canopy.
206 Coast redwood 26 Yes 5 65 22 High Surface roots; good upright form & structure; full healthy canopy.
I
Appendix B Tree Inventory Report B-43
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
207 Callery pear 18 Yes 4 35 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; history of branch failure;
healthy canopy.
208 Callery pear 16 Yes 4 35 25 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
209 Callery pear 13 Yes 4 35 25 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
210 Callery pear 17 Yes 4 35 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
211 Callery pear 12 Yes 3 35 22 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; sparse canopy.
212 Callery pear 13 Yes 4 35 24 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
213 Callery pear 17 Yes 4 35 26 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
214 Callery pear 14 Yes 4 35 26 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
B-44 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
215 Callery pear 17 Yes 4 35 28 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
216 Callery pear 18 Yes 4 40 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
217 Callery pear 17 Yes 4 40 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
218 Callery pear 17 Yes 4 40 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
219 Callery pear 16 Yes 4 40 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
220 Callery pear 17 Yes 4 40 30 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
221 Callery pear 18 Yes 4 40 24 Moderate Surface roots; slight trunk lean S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
222 Callery pear 17 Yes 4 40 20 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
I
Appendix B Tree Inventory Report B-45
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
223 Callery pear 14 Yes 4 40 18 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
224 Callery pear 14 Yes 4 40 18 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
225 Callery pear 11 Yes 3 40 18 Moderate Surface roots; slight trunk lean SW.; codominant trunks @ 7’; narrow branch
union.
226 Callery pear 15 Yes 4 40 22 Moderate Surface roots; slight trunk leans S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
227 Callery pear 15 Yes 4 40 26 Moderate Surface roots; slight trunk leans S.; multiple attachments @ 6’; narrow
branch unions; healthy canopy.
228 Callery pear 15 Yes 4 40 28 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
229 Callery pear 14 Yes 4 40 20 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
230 Callery pear 15 Yes 4 40 18 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
B-46 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
231 Callery pear 15 Yes 4 40 20 Moderate Surface roots; multiple attachments @ 6’; narrow branch unions; healthy
canopy.
232 Honey locust 8 Yes 3 12 20 Low Codominant trunks @ 6’; poor structure; small twig dieback.
233 Honey locust 7 Yes 3 12 20 Low Small trunk wound; multiple attachments @ 5’; poor structure; small
twig dieback.
234 Honey locust 8 Yes 3 12 20 Low Codominant trunks @ 6’; poor branch structure; small twig dieback.
235 Honey locust 8 Yes 2 12 15 Low Multiple attachments @ 5’; poor structure; significant twig & branch
dieback.
236 Honey locust 7 Yes 3 12 14 Low Multiple attachments @ 5’; poor structure; small twig & branch dieback.
237 Honey locust 9 Yes 3 12 18 Low Multiple attachments @ 5’; poor structure; moderate twig & branch
dieback.
238 Honey locust 8 Yes 2 12 14 Low Codominant trunks @ 5’; extensive trunk wounds; basal decay.
239 Honey locust 8 Yes 2 12 12 Low Codominant trunks @ 5’; extensive trunk wounds; basal decay.
240 Honey locust 7 Yes 2 12 12 Low Codominant trunks @ 5’; extensive trunk wounds; basal decay.
I
Appendix B Tree Inventory Report B-47
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
241 Honey locust 7 Yes 2 12 16 Low Multiple attachments @ 5’; extensive trunk wounds; basal decay.
242 Honey locust 5 Yes 3 12 10 Low Multiple attachments @ 5’; small trunk wounds; sparse canopy.
243 Honey locust 8 Yes 3 12 16 Low Multiple attachments @ 5’; small trunk wounds; sparse canopy.
244 Honey locust 6 Yes 1 12 10 Low Multiple attachments @ 5’; extensive trunk wounds & dieback.
245 Honey locust 8 Yes 2 12 14 Low Multiple attachments @ 5’; extensive trunk wounds.
246 Coast redwood 12 Yes 4 35 18 High Good upright form & structure; full healthy canopy; water-stressed.
247 Coast redwood 14 Yes 4 35 20 High Good upright form & structure; full healthy canopy.
248 Coast redwood 16 Yes 4 35 20 High Good upright form & structure; full healthy canopy.
249 Coast redwood 46 Yes 3 85 36 High Surface roots; good upright form & structure; sparse canopy W.
250 Coast redwood 47 Yes 5 85 40 High Surface roots; good upright form & structure; full healthy canopy.
251 Coast redwood 25 Yes 5 85 32 High Surface roots; good upright form & structure; full healthy canopy.
252 Coast redwood 27 Yes 3 85 30 Moderate Surface roots; good upright form & structure; sparse twiggy canopy.
B-48 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
253 Coast redwood 54 Yes 3 85 60 Moderate Surface roots; good upright form & structure; sparse twiggy canopy.
254 Coast redwood 42 Yes 4 85 40 High Surface roots; good upright form & structure; thin upper canopy.
255 Coast redwood 43 Yes 3 85 36 Moderate Surface roots; codominant in upper canopy; sparse canopy.
256 Coast redwood 43 Yes 4 85 34 Moderate Surface roots; good upright form & structure; healthy canopy.
257 Coast redwood 19 Yes 4 45 24 Moderate Surface roots; good upright form & structure; healthy canopy.
258 Coast redwood 5 Yes 4 15 12 High Good young tree.
259 Coast redwood 15 Yes 4 30 18 High Good upright form & structure; thin canopy.
260 Japanese flowering cherry 8 Yes 2 10 14 Low Multiple attachments @ 5’; root decay; suppressed.
261 Sawleaf zelkova 15 Yes 5 35 32 High Surface roots; multiple attachments @ 5’; full healthy canopy.
262 Sawleaf zelkova 25 Yes 3 45 60 Moderate Surface roots; multiple attachments @ 6’; small twig & branch dieback;
Ganoderma fruiting body on N.
263 Sawleaf zelkova 21 Yes 5 45 60 High Surface roots; multiple attachments @ 6’; full healthy canopy.
264 Japanese flowering cherry 5 Yes 5 10 20 High Multiple attachments @ 4’; full healthy canopy.
I
Appendix B Tree Inventory Report B-49
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
265 Japanese flowering cherry 5 Yes 4 10 16 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
266 Japanese flowering cherry 4 Yes 4 10 14 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
267 Japanese flowering cherry 5 Yes 4 10 16 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
268 Japanese flowering cherry 4 Yes 4 10 14 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
269 Japanese flowering cherry 4 Yes 4 10 14 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
270 Japanese flowering cherry 5 Yes 4 10 16 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
271 Japanese flowering cherry 4 Yes 4 10 14 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
272 Japanese flowering cherry 4 Yes 4 10 10 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
273 Japanese flowering cherry 4 Yes 4 10 12 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
274 Japanese flowering cherry 4 Yes 4 10 14 High Multiple attachments @ 4’; full canopy; small leaf margin burn.
275 Sawleaf zelkova 13 Yes 4 25 24 Moderate Surface roots; multiple attachments @ 6’; small twig dieback; water-stressed.
276 Evergreen ash 32 Yes 5 60 42 High Surface roots; codominant trunks @ 8’; full dense crown.
B-50 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
277 Red maple 7 Yes 5 30 20 High Multiple attachments @ 5’; full healthy canopy.
278 Red maple 8 Yes 5 30 22 High Surface roots; multiple attachments @ 5’; full healthy canopy.
279 Red maple 9 Yes 5 30 22 High Surface roots; multiple attachments @ 5’; full healthy canopy.
280 Red maple 9 Yes 5 30 22 High Surface roots; multiple attachments @ 5’; full healthy canopy.
281 Red maple 7 Yes 5 30 22 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
282 Red maple 9 Yes 5 30 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
283 Red maple 10 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
284 Red maple 10 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
285 Red maple 9 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
I
Appendix B Tree Inventory Report B-51
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
286 Red maple 10 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
287 Red maple 9 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
288 Red maple 8 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
289 Red maple 9 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
290 Red maple 8 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
291 Red maple 9 Yes 5 35 26 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
292 Red maple 10 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
293 Red maple 10 Yes 5 35 24 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
B-52 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
294 Red maple 7 Yes 5 35 20 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
295 Red maple 4 Yes 5 35 10 High Surface roots; multiple attachments @ 5’; narrow unions; full healthy canopy.
296 Coast live oak 27 Yes 5 35 56 High Surface roots; good upright form & structure; multiple attachments @ 6’;
full healthy canopy.
297 London plane 12 Yes 4 40 30 High Surface roots; good upright form & structure; codominant trunks @ 8’;
healthy canopy.
298 London plane 18 Yes 5 45 40 High Surface roots; good upright form & structure; multiple attachments @ 8’;
healthy canopy.
299 Crabapple 12 Yes 3 15 24 Low Basal & root decay; multiple attachments @ 5’.
300 Japanese flowering cherry 6 Yes 2 12 18 Low Basal & root decay; significant twig & branch dieback.
301 Coast redwood 33 Yes 4 65 30 High Surface roots; good upright form & structure; full healthy canopy.
302 Coast redwood 26 Yes 4 65 30 High Surface roots; good upright form & structure; full healthy canopy.
303 Coast redwood 24 Yes 4 65 30 High Surface roots; good upright form & structure; thin upper canopy.
I
Appendix B Tree Inventory Report B-53
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
304 Coast redwood 29 Yes 4 65 34 High Surface roots; good upright form & structure; full healthy canopy.
305 Callery pear 17 Yes 4 45 20 High Surface roots; multiple attachments @ 6’; narrow branch unions.
306 Coast redwood 22 Yes 4 55 25 High Surface roots; good upright form & structure; small twig dieback.
307 Coast redwood 31 Yes 5 65 33 High Surface roots; good upright form & structure; full healthy canopy.
308 Coast live oak 10 Yes 5 35 20 High Surface roots; codominant trunks @ 7’; full healthy canopy.
309 Raywood ash 4 Yes 3 20 8 Low Surface roots; multiple attachments @ 6’; canopy dead on N.
310 Raywood ash 9 Yes 4 35 18 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
311 Raywood ash 11 Yes 4 35 20 Moderate Surface roots; multiple attachments @ 6’; healthy canopy.
312 Coast live oak 37 Yes 5 55 64 High Multiple attachments @ 10’; large lateral on W.; healthy canopy.
313 Coast redwood 22 Yes 5 65 24 High Good upright form & structure; full healthy canopy; roots cut for new
sidewalk.
314 London plane 14 Yes 5 60 30 High Good upright form & structure; full healthy canopy.
B-54 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
315 Evergreen pear 7 Yes 3 12 10 High Trunk lean; multiple attachments @ 5’; narrow branch unions; sparse canopy.
316 Coast live oak 36 Yes 5 55 60 High Multiple attachments @ 10’; large lateral on W.; healthy canopy.
317 Coast live oak 25 Yes 5 55 45 High Codominant trunks @ 15’; healthy canopy.
318 Coast live oak 19 Yes 5 55 24 High Multiple attachments @ 10’; healthy canopy.
319 Coast live oak 29 Yes 5 55 50 High Multiple attachments @ 5’; branches extend over sidewalk & road; healthy
canopy.
320 Coast live oak 12 Yes 4 30 15 High Trunk leans W.; old trunk wound; multiple attachments @ 10’ healthy
canopy.
321 Coast live oak 10 Yes 5 20 20 High Trunk leans W.; multiple attachments @ 5’; healthy canopy.
322 Crape myrtle 4 Yes 5 12 10 High Good young tree.
323 Crape myrtle 4 Yes 5 12 10 High Good young tree.
324 Coast live oak 8 Yes 5 15 18 High Good young tree.
325 Coast live oak 13 Yes 5 30 28 High Surface roots; multiple attachments @ 8’; healthy canopy; branches extend
over sidewalk.
I
Appendix B Tree Inventory Report B-55
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
326 Coast live oak 25 Yes 5 35 50 High Surface roots; multiple attachments @ 8’; healthy canopy; history of branch
failure; branches extend over sidewalk
& road.
327 Coast live oak 18 Yes 5 35 22 High Multiple attachments @ 8’; trunk leans E.; healthy canopy.
328 Coast live oak 37 Yes 5 55 54 High Codominant trunks @ 5’; healthy canopy.
329 London plane 13 Yes 5 55 28 High Good upright form & structure; healthy canopy.
330 Japanese flowering cherry 5 Yes 2 8 10 Low Large trunk wound; no central leader. 331 Japanese flowering cherry 5 Yes 3 10 10 Low Surface roots; trunk wound; small twig dieback.
332 Japanese flowering cherry 5 Yes 4 10 16 Moderate Multiple attachments @ 2’; small twig dieback.
333 Raywood ash 9 Yes 4 30 22 Moderate Multiple attachments @ 6’; narrow branch unions; full healthy canopy.
334 Japanese flowering cherry 6 Yes 5 12 14 High Surface roots; codominant trunks @ 3’; full healthy canopy.
335 Japanese flowering cherry 5 Yes 5 12 12 High Surface roots; multiple attachments @ 3’; full healthy canopy.
336 Raywood ash 8 Yes 4 35 22 High Surface roots; multiple attachments @ 8’; full healthy canopy.
B-56 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
337 London plane 15 Yes 5 50 34 High Multiple attachments @ 10’; full healthy canopy.
338 Coast live oak 59 Yes 3 65 80 High Cabled; large trunk cavity; multiple attachments @ a 10’; branch decay @
old pruning wounds; wide spreading
canopy; healthy canopy.
339 London plane 16 Yes 5 55 52 High Codominant trunks @ 10’; good upright form & structure; full healthy canopy.
340 Coast live oak 24 Yes 4 40 28 High Off-site; canopy extends over property 28’; trunk leaning against fence; small
twig dieback.
341 Evergreen pear 10 Yes 4 15 19 Moderate Trunk leans E. over parking lot; codominant trunks @ 6’; suppressed.
342 Evergreen pear 7 Yes 3 12 16 Moderate Codominant trunks @ 5’; sparse canopy.
343 Evergreen pear 8 Yes 3 12 18 Moderate Codominant trunks @ 5’; sparse canopy.
344 Sawleaf zelkova 17 Yes 4 35 48 Moderate Surface roots; multiple attachments @ 8’; small twig dieback; water-stressed.
345 Sawleaf zelkova 17 Yes 2 35 22 Low Surface roots; multiple attachments @ 8’; large sections of bark separating;
water-stressed; significant branch
dieback.
I
Appendix B Tree Inventory Report B-57
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
346 Evergreen pear 14 Yes 3 30 35 Moderate Codominant trunks @ 6’; multiple attachments; small trunk wound; small
twig dieback.
347 Evergreen pear 8 Yes 3 20 20 Moderate Codominant trunks @ 8’; poor structure; small twig dieback.
348 Photinia 4 Yes 3 20 8 Low Codominant trunks @ 5’; significant twig dieback.
349 Evergreen pear 5 Yes 3 15 12 Moderate Codominant trunks @ 5’; small twig dieback.
350 Photinia 6 Yes 3 25 14 Low Topped; small resprouts; small twig dieback.
351 Tobira 7 Yes 3 20 16 Moderate Multiple attachments @ 6’; small twig dieback.
352 Tobira 7 Yes 3 20 20 Low Trunk sweeps upright from base; multiple attachments @ 6’; no central
leader; small twig dieback.
353 Western sycamore 11 Yes 3 35 26 Low Large surface roots; codominant trunks @ 10’; thin sinuous central leader.
354 Western sycamore 24 Yes 5 65 45 High Large surface roots; full healthy canopy.
355 Coast redwood 60 Yes 5 90 66 High Good upright form & structure; full healthy canopy.
356 Western sycamore 10 Yes 5 40 22 High Surface roots; sinuous central leader; healthy canopy.
B-58 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
357 Western sycamore 7 Yes 5 40 15 High Sinuous central leader; healthy canopy. 358 Coast redwood 21 Yes 3 65 32 Moderate Good upright form & structure; water- stressed; thin canopy.
359 Coast redwood 49 Yes 3 80 40 Moderate Codominant trunks high in crown; water- stressed; thin canopy.
360 Coast redwood 32 Yes 3 65 40 Moderate Codominant trunks high in crown; water- stressed; thin canopy.
361 Coast redwood 21 Yes 3 70 32 Moderate Good upright form & structure; water- stressed; thin canopy.
362 Coast redwood 24 Yes 3 55 26 Moderate No central leader; water-stressed; thin canopy.
363 Coast redwood 23 Yes 3 65 26 Moderate Good upright form & structure; water- stressed; thin canopy.
364 Coast redwood 20 Yes 3 60 20 Moderate Good upright form & structure; water- stressed; thin canopy.
365 Coast redwood 19 Yes 3 65 20 Moderate Good upright form & structure; water- stressed; thin canopy.
366 Coast live oak 24 Yes 4 60 52 High Codominant trunks @ 8’; small twig dieback, otherwise health canopy.
367 Coast live oak 30 Yes 5 65 65 High Surface roots; Multiple large attachments @ 8’; small twig dieback
otherwise health canopy.
I
Appendix B Tree Inventory Report B-59
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
368 Coast live oak 25 Yes 5 65 60 High Surface roots; Multiple large attachments @ 8’; small twig dieback
otherwise health canopy.
369 Coast live oak 32 Yes 3 65 56 Low Surface roots; Multiple large attachments @ 8’; bring activity in
trunk; significant twig & branch
dieback.
370 Monterey pine 17 Yes 2 60 12 Low Off-site; tagged on fence; significant twig & branch dieback; history of
branch failures.
371 Coast live oak 7 Yes 4 30 15 High Off-site; tagged on fence; trunk will grow into chain link; full healthy
canopy.
372 Coast redwood 27 Yes 3 85 28 Moderate Good upright form & structure; water- stressed; thin canopy.
373 Coast redwood 39 Yes 3 85 28 Moderate Codominant trunks @ 2’; water- stressed; thin canopy.
374 Coast redwood 41,19 Yes 3 85 38 Moderate Water-stressed; thin canopy. 375 Japanese flowering cherry 5 Yes 4 10 16 Moderate Multiple attachments @ 4’; full canopy; margin burn on entire crown.
376 Japanese flowering cherry 5 Yes 4 10 16 Moderate Multiple attachments @ 4’; full canopy; margin burn on entire crown.
B-60 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
377 Coast redwood 21,17,14 Yes 2 45 34 Low Multiple attachments @ base; water- stressed; compact soil; sparse canopy.
378 Coast redwood 29 Yes 2 60 30 Low Good upright form & structure; water- stressed; compact soil; sparse canopy.
379 Coast redwood 36 Yes 3 60 34 Moderate Good upright form & structure; water- stressed; compact soil; sparse canopy.
380 Mexican fan palm 18 Yes 5 60 10 High 40' of brown trunk; healthy crown. 381 Coast live oak 22,17 Yes 4 55 50 High Codominant trunks @ 2’; healthy canopy.
382 Evergreen ash 27 Yes 5 55 38 High Multiple attachments @ a 7’; branches fused; full healthy canopy.
383 Evergreen ash 38 Yes 4 70 64 High Multiple attachments @ a 10’; narrow branch unions; small twig dieback,
otherwise full healthy canopy.
384 Evergreen ash 25 Yes 4 50 50 High Multiple attachments @ a 10’; small twig dieback, otherwise full healthy
canopy.
385 Evergreen ash 16 Yes 4 50 46 High Codominant trunks @ 10’; small twig dieback, otherwise full healthy canopy.
I
Appendix B Tree Inventory Report B-61
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
386 Evergreen ash 14 Yes 4 50 32 High Codominant trunks @ 10’; small twig dieback, otherwise full healthy canopy.
387 Coast redwood 36 Yes 3 85 45 Moderate Good upright form & structure; water- stressed; thin canopy.
388 Coast redwood 27 Yes 3 85 36 Moderate Good upright form & structure; water- stressed; thin canopy.
389 Coast redwood 15 Yes 3 85 24 Moderate Good upright form & structure; water- stressed; thin canopy.
390 Coast redwood 32 Yes 3 85 44 Moderate Good upright form & structure; water- stressed; thin canopy.
391 Coast redwood 12 Yes 3 75 16 Moderate Good upright form & structure; water- stressed; thin canopy.
392 Coast redwood 18 Yes 3 85 26 Moderate Good upright form & structure; water- stressed; thin canopy.
393 Coast redwood 25,12 Yes 3 85 26 Moderate Good upright form & structure; water- stressed; codominant trunks @ 3’; thin
canopy.
394 Coast redwood 26 Yes 3 55 30 Moderate Good upright form & structure; water- stressed; thin canopy.
395 Coast redwood 7 Yes 2 25 14 Low Good upright form & structure; water- stressed; dead central leader; thin
canopy.
396 Coast redwood 21 Yes 3 65 24 High Good upright form & structure; water- stressed; slightly thin canopy.
B-62 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
397 Coast redwood 19 Yes 2 55 20 Low Good upright form & structure; water- stressed; thin canopy.
398 Coast redwood 16 Yes 3 40 22 Low Good upright form & structure; water- stressed; thin canopy.
399 Coast redwood 11 Yes 0 55 12 Low Dead.
400 Coast redwood 29,29 Yes 4 85 34 High Root zone had been scraped; broken roots; codominant trunks @ 2’; healthy
canopy.
401 Coast redwood 28 Yes 3 85 40 High Root zone had been scraped; broken roots; codominant trunks @ 2’; water-
stressed; moderate tip dieback.
402 Coast redwood 11 Yes 4 25 20 Moderate Good upright form & structure; water- stressed; small tip dieback.
403 Coast redwood 7 Yes 4 25 10 Moderate Good upright form & structure; water- stressed; small tip dieback.
404 Coast redwood 8 Yes 4 20 10 Moderate Good upright form & structure; water- stressed; small tip dieback.
405 Coast redwood 8 Yes 4 25 10 Moderate Good upright form & structure; water- stressed; small tip dieback.
406 Coast redwood 11 Yes 4 25 12 Moderate Good upright form & structure; water- stressed; small tip dieback.
407 Coast redwood 5 Yes 4 20 8 Moderate Good upright form & structure; water- stressed; good young tree.
I
Appendix B Tree Inventory Report B-63
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
408 Coast redwood 5 Yes 4 20 12 Moderate Good upright form & structure; water- stressed; trunk curves @ 8’;
codominant trunks @ 8’.
409 Coast redwood 6 Yes 4 20 12 Moderate Water-stressed; good young tree; codominant trunks @ 15’.
410 Coast redwood 8 Yes 4 15 12 Moderate Water-stressed; good young tree. 411 Coast redwood 8 Yes 4 15 14 Moderate Water-stressed; good young tree. 412 Coast redwood 9 Yes 4 15 16 Moderate Water-stressed; good young tree. 413 Italian stone pine 22 Yes 4 35 26 Moderate Codominant trunks @ 7’; trunk curves E.; full healthy canopy.
414 Italian stone pine 16 Yes 3 35 22 Moderate Multiple attachments @ 10’; sparse canopy.
415 Italian stone pine 16 Yes 3 35 26 Moderate Surface roots; growing on top of bathroom structure; trunk curves S.;
thin canopy.
416 Italian stone pine 11 Yes 3 25 24 Moderate Surface roots; canopy raised to 15’; trunk curves S.; suppressed on N.
417 Italian stone pine 24 Yes 3 35 36 Moderate Surface roots; codominant trunks @ 6’; full healthy canopy.
418 Italian stone pine 29 Yes 3 40 44 Moderate Surface roots; codominant trunks @ 10’; full healthy canopy.
419 Italian stone pine 21 Yes 3 40 26 Moderate Surface roots; trunk turns W. @ 20’; suppressed on N.
B-64 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
420 Italian stone pine 34 Yes 3 40 50 Moderate Surface roots; codominant trunks @ 8’; canopy raised to 25’; healthy canopy.
421 Italian stone pine 36 Yes 3 50 55 Moderate Surface roots; codominant trunks @ 8’; heavy laterals over baseball bleachers;
asymmetric canopy; roots displacing
concrete; healthy canopy.
422 Coast live oak 22 Yes 4 45 40 High Good upright form & structure; surface roots; only tree growing on mound;
multiple attachments @ 8’; moderate
twig dieback.
423 Coast live oak 17 Yes 4 35 30 High Good upright form & structure; surface roots; growing in tree well; multiple
attachments @ 7’; small twig dieback.
424 Coast live oak 20 Yes 4 45 44 High Good upright form & structure; surface roots; growing on slight slope; multiple
attachments @ 8’; full healthy canopy.
425 Chinese pistache 8 Yes 4 25 28 High Good upright form & structure; surface roots; multiple attachments @ 6’; full
healthy canopy.
426 Coast live oak 29 Yes 4 50 50 High Surface roots; suppressed on S.; asymmetric crown; codominant trunks
@ 10’; healthy canopy.
I
Appendix B Tree Inventory Report B-65
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
427 Coast redwood 33 Yes 4 80 30 High Surface roots; codominant high in canopy; thin upper canopy.
428 Coast live oak 20 Yes 4 35 35 High Surface roots; slight trunk lean S.; multiple attachments @ 6 & 10’; full
healthy canopy.
429 Coast redwood 20,15 Yes 0 55 35 Low Dead.
430 Coast redwood 9 Yes 1 25 18 Low All but dead.
431 Coast redwood 31 Yes 3 85 40 Moderate Surface roots; good upright form & structure; thin canopy; less than 1’ from
road.
432 Coast redwood 15 Yes 3 50 24 Moderate Surface roots; good upright form & structure; thin canopy; 4’ from road.
433 Coast redwood 11 Yes 2 35 16 Low Surface roots; good upright form & structure; thin canopy; 4’ from road;
water-stressed; significant dieback.
434 Coast live oak 29 Yes 4 40 55 Moderate Surface roots; codominant trunks @ 6’; branches hang E. over road; healthy
canopy.
435 Coast redwood 15 Yes 3 50 20 Moderate Good upright form & structure; water- stressed; thin canopy.
436 Coast redwood 19 Yes 3 65 20 Moderate Good upright form & structure; water- stressed; thin canopy.
437 Coast live oak 16 Yes 3 40 30 High Trunk bows S.; water-stressed; suppressed on N.; healthy canopy.
B-66 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
438 Coast redwood 32 Yes 4 80 30 Moderate Good upright form & structure; water- stressed; small tip dieback; codominant
high in canopy.
439 Coast live oak 13 Yes 4 35 20 High Asymmetric crown; heavy on W.; suppressed on E.; healthy new growth.
440 Coast live oak 27 Yes 4 45 40 High Multiple attachments @ 10; good upright form & structure; healthy
canopy.
441 Coast live oak 8 Yes 3 10 16 Low Codominant trunks @ 2’; small understory tree.
442 Coast live oak 25 Yes 4 50 34 Moderate Surface roots; codominant trunks @ 6’; full healthy canopy; retaining wall on S.
side; roots growing under wall.
443 Coast live oak 23 Yes 4 30 34 High Surface roots; multiple attachments @ 6’; suppressed on NE.; otherwise
healthy canopy.
444 Coast redwood 34 Yes 4 70 38 High Good upright form & structure; water- stressed; sparse upper canopy;
otherwise healthy crown.
445 Coast redwood 43 Yes 4 85 36 High Surface roots; good upright form & structure; healthy canopy.
446 Coast redwood 18 Yes 2 60 20 Low Surface roots; water-stressed; significant dieback.
I
Appendix B Tree Inventory Report B-67
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
447 Evergreen ash 23 Yes 4 65 44 High Surface roots; multiple attachments @ 10’; suppressed on N.; otherwise
healthy canopy.
448 Evergreen ash 24 Yes 4 65 44 High Surface roots; multiple attachments @ 10’; vigorous healthy canopy.
449 California black walnut 22 Yes 2 30 26 Low Significant twig & branch dieback; central leader dead.
450 California black walnut 28 Yes 2 20 18 Low Severe twig & branch dieback. 451 California black walnut 19 Yes 2 20 20 Low Severe twig & branch dieback; trunk decay.
452 California black walnut 12 Yes 1 12 15 Low All but dead. 453 California black walnut 20 Yes 2 25 28 Low Codominant trunks @ 5'; significant twig & branch dieback; trunk decay.
454 California black walnut 18 Yes 2 25 28 Low Significant twig & branch dieback; leaders dead.
455 California black walnut 18 Yes 2 25 26 Low Codominant trunks @ 5'; significant twig & branch dieback; trunk decay.
456 California black walnut 31 Yes 2 30 26 Low Significant twig & branch dieback; dead central leader; trunk decay.
457 California black walnut 32 Yes 2 30 34 Low Codominant trunks @ 5'; significant twig & branch dieback; trunk decay.
458 California black walnut 26 Yes 3 35 38 Low Codominant trunks @ 5'; moderate twig & branch dieback.
B-68 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
459 California black walnut 22 Yes 2 30 20 Low Codominant trunks @ 10'; significant twig & branch dieback; main stems
dead.
460 California black walnut 26 Yes 2 25 16 Low Codominant trunks @ 5'; large trunk wound; significant twig & branch
dieback; leaders dead.
461 California black walnut 25 Yes 2 25 12 Low Multiple attachments @ 8'; significant twig & branch dieback; leaders dead.
462 Coast redwood 20 Yes 3 55 22 Moderate 7' from street; good upright form & structure; water-stressed; tip dieback.
463 Coast redwood 12 Yes 3 45 20 Moderate Good upright form & structure; water- stressed; moderate tip dieback.
464 Coast redwood 20 Yes 3 50 24 Moderate Good upright form & structure; water- stressed; moderate tip dieback.
465 Coast redwood 31 Yes 4 70 32 High Good upright form & structure; full healthy canopy.
466 California black walnut 16,15 Yes 2 20 25 Low Codominant trunks @ 5'; significant twig & branch dieback; trunk decay.
467 Scot's pine 7 Yes 2 20 16 Low Surface roots; canopy raised to 8’; significant twig & branch dieback; thin
canopy.
468 Scot's pine 8 Yes 2 15 16 Low Surface roots; canopy raised to 8’; significant twig & branch dieback; thin
canopy.
I
Appendix B Tree Inventory Report B-69
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
469 Scot's pine 14 Yes 3 25 22 Moderate Trunk leans N.; asymmetric crown; multiple attachments; small needle
dieback.
470 Chinese pistache 8 Yes 5 20 26 High Multiple attachments @ 7’; full healthy canopy.
471 Coast live oak 43 Yes 5 45 65 High Good form & structure; multiple attachments @ 8’; full healthy canopy.
472 California black walnut 30 Yes 3 35 34 Low Codominant trunks @ 8’; moderate twig & branch dieback; ground squirrel
holes @ base.
473 Hollywood juniper 12 Yes 3 8 10 Low Multiple attachments @ 1’; suppressed; small understory tree.
474 Hollywood juniper 10 Yes 2 12 8 Low No central leader; small crown; multiple branches removed.
475 Hollywood juniper 7,7,5 Yes 2 15 18 Low Dead central leader; poor structure; vase-shape; small dieback.
476 California black walnut 38 Yes 2 35 34 Low Multiple attachments @ 6’; significant twig & branch dieback; trunk decay.
477 Hollywood juniper 15 Yes 3 12 15 Low Multiple attachments @ 6”; washed out @ base; low wide crown.
478 Hollywood juniper 15 Yes 3 12 15 Low Multiple attachments @ 6”; washed out @ base; low wide crown.
B-70 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
479 London plane 13 Yes 3 35 30 Moderate Multiple attachments @ 6’; suppressed on N.; branches extend over sidewalk;
sparse canopy.
480 Coast live oak 31 Yes 3 35 60 High Basal decay; multiple attachments @ 6’; suppressed on W.; branches extend
over sidewalk; sparse canopy.
481 Coast live oak 24 Yes 4 40 65 High Good upright form & structure; multiple attachments @ 15’; foliage mostly in
upper crown.
482 Coast live oak 23 Yes 3 40 42 High Good upright form & structure; multiple attachments @ 10’; sparse canopy;
trunk leans slightly N.
483 Italian stone pine 33 Yes 4 50 35 Moderate Codominant trunks @ 8’; canopy lifted to 25’; trunk leans slightly W.; healthy
canopy.
484 Italian stone pine 36 Yes 4 55 65 High Codominant trunks @ 6’; canopy lifted to 25+’; full healthy canopy.
485 Japanese flowering cherry 4 Yes 4 8 14 Moderate Good young tree; healthy canopy. 486 Japanese flowering cherry 5 Yes 4 10 18 Moderate Good young tree; margin burn on entire crown.
487 Scot's pine 12 Yes 3 25 22 Moderate Water-stressed; canopy lifted to 10’; multiple attachments; small needle
dieback.
I
Appendix B Tree Inventory Report B-71
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
488 Chinese elm 11 Yes 4 25 40 High Multiple attachments @ 7’; small twig & branch dieback.
489 Chinese elm 8 Yes 4 20 26 High Multiple attachments @ 8’; good young tree.
490 Canary Island pine 19,17 Yes 4 70 28 High Codominant trunks @ 3’; full healthy canopy; 4’ from street.
491 Canary Island pine 20 Yes 4 70 28 High Good upright form & structure; full healthy canopy; 3’ from street.
492 Canary Island pine 19 Yes 4 70 26 High Good upright form & structure; full healthy canopy.
493 Deodar cedar 17 Yes 4 50 28 High Trunk leans slightly S.; branches overhang sidewalk & street; full healthy
canopy.
494 Canary Island pine 16 Yes 3 65 22 Low Suppressed on N.; significant dieback on N.; asymmetric canopy.
495 Canary Island pine 14 Yes 3 65 20 Moderate Good upright form & structure; moderate twig & branch dieback.
496 Canary Island pine 27 Yes 5 85 40 High Good upright form & structure; full healthy canopy; branches extend over
street.
497 Deodar cedar 15 Yes 4 55 30 High Good upright form & structure; suppressed on S.; otherwise healthy
canopy.
498 Deodar cedar 23 Yes 3 60 36 High Good upright form & structure; suppressed on W.; sparse canopy.
B-72 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
499 Southern live oak 4 Yes 4 10 6 Moderate Multiple attachments @ 6’; suppressed N & W.; sparse canopy.
500 Southern live oak 7 Yes 2 12 17 Low Multiple attachments @ 6’; extensive trunk decay; full healthy canopy.
501 Canary Island pine 28 Yes 4 75 40 Moderate Good upright form & structure; full healthy canopy; 5’ from sidewalk;
branches extend over street; history of
branch failure.
502 Deodar cedar 22 Yes 4 65 46 High Codominant trunks high in crown; suppressed on S.; full healthy canopy.
503 Canary Island pine 27 Yes 5 85 44 High Good upright form & structure:
branches extend over street; full
healthy canopy.
504 Southern live oak 17 Yes 3 30 40 High Multiple attachments @ 8’; small twig & branch dieback; branches extend over
street.
505 Deodar cedar 24 Yes 3 40 46 High Multiple attachments @ 10’; trunk leans slightly S.; sparse canopy; branches
extend over street.
506 Deodar cedar 26 Yes 3 40 46 High Multiple attachments @ 10’; candelabra form; sparse canopy;
branches extend over street.
507 Southern live oak 13 Yes 1 25 24 Low All but dead.
I
Appendix B Tree Inventory Report B-73
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
508 Southern live oak 13 Yes 4 35 26 High Multiple attachments @ 8’; small twig dieback; branches extend over street.
509 Deodar cedar 26 Yes 4 45 42 High Multiple attachments @ 8’; slight candelabra form; healthy canopy;
branches extend over street.
510 Canary Island pine 21 Yes 5 70 44 High Canopy lifted to 20’; full healthy canopy.
511 Canary Island pine 22 Yes 5 70 36 High Canopy lifted to 20’; suppressed on S.; otherwise full healthy canopy.
512 Canary Island pine 20 Yes 5 70 20 High Canopy lifted to 20’; suppressed on W.; codominant trunks high in crown; full
healthy canopy.
513 Canary Island pine 23 Yes 5 70 30 High Canopy lifted to 25’; suppressed on W.; full healthy canopy.
514 Deodar cedar 12 Yes 4 30 24 High Trunk wound on W.; full healthy canopy.
515 Deodar cedar 13 Yes 5 30 30 High Multiple attachments @ 6’; full healthy canopy.
516 Deodar cedar 18 Yes 5 30 32 High Multiple attachments @ 5’; candelabra form; full healthy canopy.
517 Deodar cedar 7,4 Yes 5 20 16 High Codominant trunks @ base; good young tree.
518 Deodar cedar 4 Yes 4 15 10 Moderate Suppressed understory tree, healthy canopy.
B-74 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
519 Deodar cedar 15 Yes 4 30 32 Moderate Multiple attachments @ 6’; trunk leans E.; candelabra form; healthy canopy.
520 Deodar cedar 4 Yes 4 20 14 Moderate Suppressed understory tree; healthy canopy.
521 Blue atlas cedar 12 Yes 4 30 26 High Multiple attachments @ 7’; full healthy canopy.
522 Deodar cedar 14 Yes 5 35 30 High Multiple attachments @ 5’; good upright form & structure, full healthy
canopy.
523 Deodar cedar 17 Yes 5 40 26 High Multiple attachments @ 6’; good upright form & structure, full healthy
canopy.
524 Deodar cedar 15 Yes 5 40 30 High Multiple attachments @ 5’; candelabra form; full healthy canopy.
525 Deodar cedar 13 Yes 5 40 26 High Multiple attachments @ 5’; good upright form & structure; full healthy
canopy.
526 Deodar cedar 17 Yes 5 40 34 High Multiple attachments @ 6’; good upright form & structure; full healthy
canopy.
527 Deodar cedar 11 Yes 5 35 20 High Multiple attachments @ 5’; good upright form & structure; full healthy
canopy.
I
Appendix B Tree Inventory Report B-75
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
528 Canary Island pine 21 Yes 5 60 28 High Multiple attachments @ 10’; good upright form & structure; suppressed
on W.; otherwise full healthy canopy;
codominant high in crown.
529 Canary Island pine 22 Yes 4 60 32 High Multiple attachments @ 10’; good upright form & structure; suppressed
on E.; otherwise full healthy canopy;
codominant trunks high in crown.
530 Red ironbark 31 Yes 3 60 40 Low Multiple attachments @ 8’; narrow branch unions; history of branch failure.
531 Canary Island pine 17 Yes 4 45 28 Moderate Codominant trunks @ 8’; trunk 3’ from wall & 4’ from parking lot; full healthy
canopy.
532 Canary Island pine 23 Yes 4 60 38 Moderate Displacing hardscape; trunk 3’ from wall & 4’ from parking lot; full healthy
canopy.
533 Canary Island pine 27 Yes 4 60 32 Moderate Multiple attachments @ 10’; trunk 3’ from wall & 5’ from parking lot; full
healthy canopy.
534 Evergreen pear 9 Yes 4 15 22 High Multiple attachments @ 6’; good young tree; trunk 4’ from wall & 5’ from
parking lot.
535 Canary Island pine 8 Yes 5 30 10 High Good young tree.
B-76 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
536 Callery pear 20 Yes 3 35 32 Moderate Multiple attachments @ 7’; history of branch failure; small twig dieback;
branches extend over parking lot.
537 Callery pear 4 Yes 5 10 8 High Good young tree.
538 Canary Island pine 19 Yes 4 45 22 High Canopy lifted to 20’; full healthy canopy.
539 African fern-pine 14 Yes 4 25 24 Moderate Multiple attachments @ 5’; trunk 1’ from tennis courts; 3’ from curb;
chlorotic leaves.
540 African fern-pine 14 Yes 4 25 20 Moderate Multiple attachments @ 5’; trunk 1’ from tennis courts; 3’ from curb; full
healthy canopy.
541 African fern-pine 14 Yes 4 30 22 Moderate Multiple attachments @ 8’; slightly chlorotic leaves; full canopy.
542 African fern-pine 15 Yes 4 30 30 Moderate Multiple attachments @ 4’; narrow branch unions; small twig dieback;
trunk 1’ from tennis courts & 1’ from
curb.
543 African fern-pine 8 Yes 3 20 10 Moderate Topped; multiple attachments small crown; trunk 1’ from tennis courts & 1’
from curb.
544 African fern-pine 14 Yes 3 25 24 Moderate Topped; multiple attachments @ 5’; narrow branch unions; trunk 4’ from
tennis courts & 3’ from curb.
I
Appendix B Tree Inventory Report B-77
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
545 African fern-pine 10 Yes 3 25 18 Moderate Topped; multiple attachments @ 8’; narrow columnar form; small crown;
trunk 1’ from tennis courts & 1’ from
curb.
546 Holly oak 5,4,4 Yes 4 15 22 High Multiple attachments @ base; 2’ from tennis courts; full healthy canopy.
547 Evergreen pear 7 Yes 2 12 8 Low Suppressed understory tree; small canopy.
548 Evergreen pear 5 Yes 2 12 8 Low Suppressed understory tree; small canopy.
549 Evergreen pear 6,6 Yes 3 10 12 Low Codominant trunks @ 2’; sparse canopy.
550 Evergreen pear 6 Yes 3 15 14 Low Suppressed understory tree; sparse canopy.
551 Canary Island pine 13 Yes 4 40 24 High Good upright form & structure; canopy lifted to 15’; full healthy canopy.
552 Callery pear 6 Yes 4 30 16 Moderate Codominant trunks @ 5’; suppressed on N.; otherwise healthy canopy.
553 Canary Island pine 15 Yes 4 65 22 Moderate Good upright form & structure; canopy lifted to 20’; small twig dieback.
554 Canary Island pine 28 Yes 4 75 36 Moderate Good upright form & structure; canopy lifted to 20’; small twig dieback.
B-78 Memorial Park Specific Plan
TREE SPECIES TRUNK PRO- CONDITION CANOPY TREE SUITABILITY COMMENTS No. DIAMETER TECTED 0=dead SPREAD HEIGHT for
(in.) TREE 5=excel- (est. feet) (est. feet) PRESERVATION ? lent
Tree Assessment
Memorial Park
Cupertino CA
October 2022
555 Canary Island pine 25 Yes 4 70 38 High Good upright form & structure; canopy lifted to 20’; full healthy canopy.
556 African fern-pine 13 Yes 3 15 14 Low Multiple attachments @ 6’; topped; 4’ planting strip; sparse canopy.
557 African fern-pine 15 Yes 4 30 26 Moderate Multiple attachments @ 7’; 4’ planting strip; full healthy canopy.
558 African fern-pine 13 Yes 3 20 16 Low Multiple attachments @ 6’; topped; 4’ planting strip; sparse canopy.
559 Canary Island pine 18 Yes 4 70 33 High Good upright form & structure; full healthy canopy.
560 Deodar cedar 25 Yes 4 70 40 High Candelabra form; suppressed on W.; otherwise healthy canopy.
I
Memorial Park Specific Plan C-1
Community Engagement Data
Appendix C
-
This Page
Intentionally
Left Blank
Appendix C Community Engagement Data C-3
Community Engagement Methods
The success of the Memorial Park Specific Plan relied
on the involvement of community members to shape
the project’s vision, goals, and priorities. Outreach
and engagement were pivotal components of the
planning process to inform the development of the
site design and ensure Memorial Park reflects the the
needs of Cupertino’s diverse community.
Community engagement for the project was
conducted in three rounds utilizing virtual and in-
person formats to solicit input and provide a variety
of convenient options to get involved. Outreach
activities included virtual focus group meetings,
webinars, online surveys, public presentations,
public comment periods, and in-person events
in Cupertino. The engagement strategy utilized
multiple avenues to increase public awareness of the
project and its outreach events, including digital and
printed promotional materials.
Focus Group Interviews
The purpose of focus group interviews is to provide
community members with an opportunity to speak
in a small group setting with the project team. These
meetings help the project team gain in-depth details
on park priorities from representatives of designated
topics. Seven focus group interviews occurred
between September and December 2022 and included
over 30 participants from resident neighborhoods,
local civic and community organizations, cultural
groups, school districts, advocacy groups, and City
of Cupertino staff.
Focus group interviews included dialogue about
existing uses, the park’s identity scenarios now and
in the future, and the types of spaces or features
desired. Participants first were asked which primary
identity scenario they would currently use to define
the park—Civic Event Space, Community Gathering
Space, or Natural Site and Park. Participants
provided input about how they use the park, what
they like, and what challenges they have noticed.
Following this discussion, participants were asked to
select the primary identity scenario they would like
to see emphasized in the future, using the same three
options available to define the park currently—Civic
Event Space, Community Gathering Space, or Natural
Site and Park. The next series of questions solicited
input about specific features participants would like
to see at Memorial Park that support these three
identity scenarios. The meeting concluded with an
open discussion about other concerns or possibilities
to revitalize the park.
September to November 2022
WHAT DO
WE WANT?
PUBLIC REVIEW
PERIOD
WHAT ALTERNATIVE
IS BEST?
ROUND 1 ROUND 2 ROUND 3
January to June 2023 August 2023 to April 2024
Pop-Up Events (3)
Online Survey
Community Webinar
Focus Group Interviews
Design Concept Open House
Online Survey
Community Webinar
Commission & Council
Presentations
Commission & Council
Presentations
Online Design Concept
Review
Figure C-1: Outreach Process
-
C-4 Memorial Park Specific Plan
Community Webinar
A community webinar was held on September
15, 2022, to introduce the project to the public and
offer a forum for community input. In this virtual
information session, participants learned about
specific project goals, milestones, and opportunities
for community involvement. Several online polls
conducted during the webinar collected data from
participants on residence demographics and park
usage.
A second community webinar was conducted on
February 9, 2023, to present the preliminary concept
plans and gather community feedback to build
towards a preferred design. In this virtual session,
the project team shared the design inputs that guided
the concept development and the prior community
engagement efforts and key findings. The participants
were introduced to the three preliminary concept
plans for the revitalized Memorial Park.
Pop-Ups in the Community
Pop-up booths at community events employ a “go
to them” approach by raising awareness about
the project and offering interactive, in-person
information-gathering activities. In addition to
gathering important input from the public, pop-
up events also help increase participation in other
engagement opportunities, such as the community
survey and events later in the project process.
During initial pop-up events for the Memorial Park
Specific Plan (listed below), a diverse group of over
1,400 people visited the booths, reviewed visual
materials, engaged in conversations with the project
team, and provided input about the park.
•
Library
& Bobateeno, Cupertino Library/Civic
Center Plaza, September 17, 2022
•
Silicon
Valley Day ‘N Night Fun Fest, Memorial
Park, September 24, 2022
•
Bay
Area Diwali Festival of Lights, Memorial Park,
October 8, 2022
Poster boards were used to collect input using dot
stickers indicating the community’s views on specific
park elements and spaces as well as the park’s
overall identity. Participants were asked to select
Image C-1: Library & Bobateeno Pop-up
Image C-2: Pop-up at Silicon Valley Day ‘N Night Fun Fest Image C-3: Pop-up at Bay Area Diwali Festival of Lights -
Appendix C Community Engagement Data C-5
one of three identity scenarios—Civic Event Space,
Community Gathering Space, or Natural Site and
Park—to identify the park now and how they would
like it to be in the future. Participants also voted for their two favorite current features of Memorial Park
and for their two most desired features in each of the
three identity scenarios.
Open House
An open house event was held on Saturday,
February 4, 2023, at the Cupertino Senior Center to
collect feedback on the preliminary concept plans in
an in-person format. Approximately 50 community
members attended this event, and while there were
several children and teens, most attendees were
adults and seniors.
The three preliminary concept plans were displayed
on large poster boards and participants provided
comments explaining their likes, dislikes, and other
observations for each one. Participants used dot
stickers to vote for the most important features to
include in the final concept plan and a token to vote
for their favorite concept overall. Attendees also
had an opportunity to speak with the project team,
discuss ideas, and learn more about the Memorial
Park Specific Plan.
Survey
The purpose of a survey is to gather broad-based
input on a range of topics important to the Memorial
Park Specific Plan, and an online version allows
people to participate from a wide variety of locations
on their own time while still providing valuable
feedback on the project.
The initial survey for the Memorial Park Specific Plan
was conducted virtually on the Engage Cupertino
website during the first round of community
engagement and ran from September 8 through
October 9, 2022. The survey was offered in English,
Hindi, and Chinese. Over 850 responses to the online
survey were received from youth, adults, and seniors.
The initial project survey asked the community to
identify spaces and features most liked and desired
at Memorial Park and to identify the primary identity
scenario—Civic Event Space, Community Gathering
Space, or Natural Site and Park—which best describes
the park at present and how it should evolve in the
future. Participants also provided information about
their park visiting habits, residence areas, and other
demographics.
Image C-4: Open House at the Cupertino Senior Center
Figure C-2: Round 1 Survey Statistics from Engage Cupertino -
C-6 Memorial Park Specific Plan
Method Intent/Purpose Media Duration
Engage
Cupertino
(Project Website)
An information resource for residents and
location to post status updates about the project. Online Entire project Survey To gather community input on existing
conditions and future desires for Memorial Park.
Online; available in English,
Chinese, and Hindi
September 15 to
October 9, 2022
January 25 to
February 22, 2023
Pop-up Events To complement the online survey with in-person participation opportunities.
In-person; printed boards
with interactive dot stickers
September 17, 24,
and October 8, 2022
Open House To complement the online survey with in-person participation opportunity.
In-person; printed boards
with interactive dot stickers February 4, 2023
Focus Group
Interviews
To begin the outreach process with City staff and
the community. Virtual September through
December 2022
Community
Webinar
To gather community feedback on existing
conditions and future desires for Memorial Park. Virtual September 15, 2022 February 9, 2023
Commission
and Council
Presentations
To present the project, gather input, and report
on the project status. Virtual; presentation
February 2, 2023
February 23, 2023
June 1, 2023
June 21, 2023
Public Comment
Period
To present the preferred site plan to the
community for input. Virtual August/September
2023
Park Sign To inform about the project status and
encourage community input.
In-person; posted in
Memorial Park Entire project
Social Media
Post
To spread the word about community
engagement efforts and generate participation.
Online; Facebook and
Instagram profiles Entire project
Postcards and
Door Hangers
To spread the word about community
engagement efforts and generate participation.
Postcards distributed to all
City residences and door
hangers to park-adjacent
residences
September 2022
January 2023
Commission
and Council
Announcements
To announce the project, gather input, and
encourage participation.
Virtual and in-person;
presentation
September and
October 2022
January and
February 2023
City Newsletter To spread the word about community
engagement efforts and generate participation. Virtual and hardcopies January 26 and February 2023
Table C-1: Outreach Methods
-
Appendix C Community Engagement Data C-7
The second survey was also conducted virtually on
the Engage Cupertino website during the second
round of community engagement. It ran from January
25 through February 22, 2023. Over 1,000 responses
to the online survey were received from a broad cross
section of the Cupertino community.
The second project survey asked community
members to identify their favorite and least favorite
features of the three preliminary concept plans, to
choose their overall preferred option, and to indicate
the reason for their choice. Participants also selected the most important features to include in the final
concept plan.
Public Meetings
At various stages throughout the project,
presentations and announcements were given at
City of Cupertino public meetings, including City
Council, Parks and Recreation Commission, Bicycle
Pedestrian Commission, Planning Commission,
Library, Commission, and Teen Commission. During
these meetings, commissioners, council members,
and the public had opportunities to review project
information and receive progress updates. At some
meetings, attendees provided feedback to guide the
development of the Memorial Park Specific Plan.
Public Comment Period
A public comment period began on August 31, 2023,
and ran for two weeks. During this time, the preferred
concept plan was posted on the Engage Cupertino
website, and community members responded with
feedback sent directly to the City via email.
-
C-8 Memorial Park Specific Plan
Round 1 Results: Community Themes
Community outreach efforts during the initial stage
of the project collected input on a wide range of
topics including current park features, usage habits,
and ideas for revitalizing Memorial Park. Outreach
themes highlighted during the first round of
engagement align with several themes and priorities
identified in the City’s Parks and Recreation System
Master Plan, as outlined below.
The Parks and Recreation System Master Plan’s
vision for Memorial Park recommends expanding
the civic event and community gathering spaces and
enhancing natural site and park features. Participants
in the outreach process for the Memorial Park Specific
Plan support this recommendation and agree that the
park best serves the community by providing spaces
and features that focus on all three identity scenarios:
Civic Event Space, Community Gathering Space, and
Natural Site and Park. Overall, the community wants
Memorial Park to be easy to get to and move through,
include distinctive spaces for social activities, offer a wide variety of engaging recreation options in
a nature-oriented setting, and support a healthy,
cohesive community in a manner that is uniquely
Cupertino.
Suggested improvements for the park focused on a
combination of passive and active uses, as well as
social and individual experiences. Improving event
spaces such as the amphitheater, enhancing the tree
canopy and shade, adding recreation activities and
amenities, enhancing nature experiences, expanding
inclusive options, and improving park access
were recommendations outlined in the Parks and
Recreation System Master Plan equally supported by
outreach input for the Memorial Park Specific Plan.
Residents want easy, enhanced access
to parks and recreation opportunities.
Community members want more
opportunities to connect to nature.
Cupertino desires a variety of play
experiences for all ages and abilities.
Parks and recreation opportunities
should reflect Cupertino’s character,
heritage, and diverse community.
Residents and visitors desire a wide
range of recreation options.
Residents appreciate community
events and would like to see more
spaces in Cupertino for bringing
people together.
PARK & FACILITY
ACCESS
UNIQUELY
CUPERTINO
NATURE
EXPERIENCE
RECREATION
VARIETY
EXTRAORDINARY
PLAY
SOCIAL GATHERING
& CELEBRATION
Figure C-3: Overlapping Key Themes from 2020 Parks and Recreation System Master Plan Community Outreach Community Outreach Themes from 2020 Parks and Recreation System Master Plan that Align with Memorial Park Outreach Results
-
Appendix C Community Engagement Data C-9
Park and Facility Access
A park that is convenient to
visit, easy to navigate, and
accommodating to a diverse
range of needs creates users
who are more confident,
comfortable, and satisfied with
the park experience. Round 1 outreach participants
indicated that improving access to activities and
amenities at Memorial Park was a priority. Bike lane
connectivity, pedestrian paths, parking, inclusiveness, and mobility were all identified in outreach input as
important topics to consider for park improvements.
As community priorities related to health and
environmental sustainability evolve, active
transportation, such as walking or biking, is emerging
as a priority across the globe. Based on survey
responses received, park visitors use a wide variety
of transportation, including active methods to get
to Memorial Park. According to outreach responses,
multi-use pathways and bike-friendly access points
that connect to local trails, bicycle networks, and
sidewalks are important park features.
Improved accessibility and inclusiveness at the
park was also desired for the future Memorial Park.
Community members engaging in outreach activities
represented various different ethnicities and ages
groups and recognized that Memorial Park should
strive to meet the diverse needs of park users. For
example, amenities for all ages and abilities, such
as an inclusive playground, received support from
outreach participants.
Figure C-4: Key Community Preferences and Desires - Park and Facility Access Theme
WALKING
PATHS
#1
FAVORITE
CURRENT PARK
FEATURE
CONNECTIVITY TO
BIKE TRAILS AND
BIKE LANES
#1
MOST
DESIRED
COMMUNITY
GATHERING
SPACE FEATURE
WALKING
OR BIKING
FOR EXERCISE
#2
MOST
POPULAR
REASON
TO VISIT
“ ”
Parks should facilitate transit.
A large open space is useless
if it doesn’t allow walkers/bikers to
use it to get to places.
“ ”
Expanded / wider pedestrian
walking route space would be great.
“ ”
Access to more parking is an issue
for festivals and events,
especially for older adults.
OUTREACH PARTICIPANT QUOTES
-
I I
I I
I I
I I
I
I
I •
C-10 Memorial Park Specific Plan
Nature Experience
For ecological, aesthetic, and
health reasons, nature spaces
are highly valued park features.
Natural environments provide
opportunities for meditation,
connection, and inspiration
and appeal to visitors of all ages. Memorial Park is
strongly identified by the community as a natural site.
In terms of both existing and potential park features,
nature elements and opportunities to engage with
nature were consistently rated highly during initial
engagement.
When asked about the current state of Memorial Park,
participants in all forms of community outreach gave
significant attention to the park’s natural experiences.
Nearly half of all survey respondents visit Memorial
Park to connect with nature, and according to online
responses, nature areas, trees, and lawn spaces were
favorite Memorial Park features. Looking to the
future, the community was eager to see an enhanced
tree canopy to provide more shade at the park.
Outdoor learning opportunities, sensory experiences
such as nature walks or mazes, and quiet places
of reflection were noted as potential options for
furthering the community’s connection to nature at
Memorial Park. Offering environmental-oriented
engagement that is both active and educational,
nature play was highly desired by the community.
Nature play fosters creativity and develops physical
and social skills by encouraging outdoor play with
natural elements such as logs, trees, leaves, rocks, and sand. Native plant areas or demonstration gardens
were also popular suggestions for enhancing the
park’s natural features.
“ ”
MORE grass, MORE trees please.
Unadulterated open space with trees
and grass is increasingly scarce in
today’s world. In our playtime activities,
we can do with open space.
“ ”
The park needs LOTS more shade
and drought-tolerant trees and plants.
OUTREACH PARTICIPANT QUOTES
Figure C-8: Top 5 Natural Site and Park Features Desired (Round 1 Outreach)
-
---- TOPS ---
NATURAL SITE AND
PARK FE TU ES DESIRED
I
I
I
I
Combined on/ine and in-person votes
NEW NATURE-PLAY s·- #1·~
OPPORTUNITIES ~
' k
I
• I
I
Appendix C Community Engagement Data C-11
Extraordinary Play
Outdoor play is known to
benefit both mind and body.
It is an excellent way to
experience the intrinsic joy
created by physical activity,
stay fit, connect with others,
and explore the natural world. Memorial Park
outreach activities showed that participants value
play for all ages and abilities and want diverse play
amenities that go beyond the typical to provide
elevated experiences for park visitors.
Play opportunities for children were voted a high
priority during Memorial Park outreach activities.
Playgrounds were well-liked current park features
and also garnered attention for improvement in
the future. Participants desired Memorial Park’s
playgrounds to be renovated and expanded and
suggested including new equipment for children
of all ages and abilities to improve play experiences
for the future. Nature play—an unstructured play
experience using logs, rocks, and other elements
found in nature—is a unique way for children to be
active and engage with the outdoor environment,
and it is not surprising that this feature rated highly during the outreach process, given the community’s
overall desire for more nature-oriented activities at
Memorial Park. Outreach participants also supported
the addition of new water play elements at Memorial
Park.
Image C-5: Play Area at Memorial Park
“ ”
The play structures need to be
updated. We rarely use that park
for its play space because the
playground is so dated and lacks shade.
“ ”
Would love to see creative play
for all age groups...
OUTREACH PARTICIPANT QUOTES
#2
MOST
DESIRED
NATURAL SITE
AND PARK
FEATURE
NATURE PLAY
OPPORTUNITIES
#5
MOST
DESIRED
COMMUNITY
GATHERING
SPACE
FEATURE
NEW UNIVERSAL
OR ALL-INCLUSIVE
AMENITIES
Figure C-9: Key Community Preferences and Desires - Extraordinary Play Theme -
I
I
I • I
I
I
I
C-12 Memorial Park Specific Plan
Uniquely Cupertino
Cupertino celebrates the
diversity of its residents.
Memorial Park is a multi-faceted
public space that is known for
hosting various cultural events
and providing unique recreational experiences for
the entire Cupertino community.
The park’s highest-rated features represented a broad
mix of social, natural, and physically active uses.
Attending cultural events, connecting with nature,
gathering with friends, and exercising were all top
reasons survey respondents visit Memorial Park.
Input collected during outreach activities indicated
the community supports the multi-faceted identity
of the park and takes pride in how it simultaneously
fulfills a range of purposes for the City of Cupertino.
The community recognizes that Memorial Park
is at its best when it provides events, gatherings,
recreation opportunities, and nature experiences.
This robust combination of features is part of what
makes Cupertino unique and keeps visitors coming
back to enjoy the park.
Festivals and public events at Memorial Park are
strongly supported by the community. These
activities, which highlight Cupertino’s diversity
and civic-minded enthusiasm, were voted top park
activities by outreach participants. A wide array of
community-based events and artistic performances
reflect the character of Cupertino and make Memorial
Park a unique destination. Feedback from Round 1
outreach indicated that the community desires further
enhancements to these distinct and valued park
experiences, including upgrading the amphitheater,
expanding or upgrading event spaces, and hosting
more large, outdoor events.
“
”
I have lived in Cupertino for most
of my life, and my greatest memories
there include Girl Scouts,
Shakespeare in the Park, Camps,
the Playground, meeting friends
to socialize/walk, and
holiday or festival gatherings.
“ ”
The park is a beautiful community
space that needs to continue to be
a walkable natural park.
OUTREACH PARTICIPANT QUOTES
Image C-6: Taiko Drummers at the Cherry Blossom Festival TOP 5
REASONS
TO VISIT
MEMORIAL
PARK
Survey Question #3
494
INDIVIDUAL
EXERCISE
GATHERING
WITH FRIENDS
& FAMILY
CONNECT
WITH NATURE
WALK OR BIKE
FOR EXERCISE
(INDIV. OR GROUP)
ATTEND A
SPECIAL EVENT
(PERFORMANCE
OR FESTIVAL)
387 381 359
228
Total number
of votes
Figure C-10: Top 5 Current Reasons to Visit Memorial Park (Round 1 Survey, Question 3) -
I
I
•
r -
I
Appendix C Community Engagement Data C-13
Recreation Variety
Cupertino is a diverse
community with a broad array
of backgrounds, interests,
ages, and abilities among its
residents. For Memorial Park
to best serve that community, it needs to provide
recreation options that meet a wide range of needs,
and the community strongly supports expanding the
park’s recreation options in a variety of ways.
Many Memorial Park users frequent the park for
recreation activities such as sports, walking, running, and biking. Existing walking paths were voted the
top park feature, and outreach participants requested
multi-use paths at the park to allow for more diverse
uses. Multi-use paths connect park elements, allow
visitors to have an immersive park experience, and
can be used safely by visitors of all ages.
Active outdoor recreation amenities that appeal
to different interests were popular among outreach
participants. The park’s open lawn areas are
frequently used for informal athletic activities such
as soccer, baseball, football, and frisbee. According
to community feedback, many Memorial Park users
are active tennis and pickleball players who enjoy the
current amenities for racquet sports and support the
addition of more dedicated tennis courts, dedicated
pickleball courts, and outdoor lighting. Other
recreation amenities to serve children, teens, adults,
and seniors of all abilities, such as outdoor fitness
stations, inclusive play equipment and basketball
courts, were community-desired park enhancements.
Image C-7: Open Lawn for Informal Athletic Activities
NATURE PLAY
OPPORTUNITIES
MORE
ACTIVITIES AND
AMENITIES FOR ALL
AGES AND ABILITIES
#2
MOST
DESIRED
COMMUNITY
GATHERING
SPACE FEATURE
NEW
RECREATION
AMENITIES
#2
MOST
DESIRED
CIVIC EVENT
SPACE FEATURE
MORE
MULTI-USE PATHS
#5
MOST
DESIRED
NATURAL SITE
AND PARK
FEATURE
Figure C-11: Key Community Preferences and Desires - Recreation Variety Theme “ ”
I enjoy taking daily walks at Memorial
Park and love that I see all walks of life
enjoying the park.
“ ”
Tennis at Memorial Park is amazing!
“
Please add dedicated
pickleball courts!
”
OUTREACH PARTICIPANT QUOTES
-
I I
I ■
I
I I I
C-14 Memorial Park Specific Plan
Social Gathering and
Celebration
As an essential element of
human health and wellness,
social interaction is known to
increase happiness, improve
brain function, and generate a
sense of safety and belonging. With several settings
for hosting large public events, as well as smaller
spaces for more intimate gatherings, Memorial
Park offers valuable opportunities for community
celebrations and social activities that, according to
outreach participants, should be enhanced in the
future.
Memorial Park is already geared toward community-
building social activities for users. According to
the survey, the most popular reason respondents
visit Memorial Park is to attend special events such
as the Cupertino Cherry Blossom Festival, Silicon
Valley Day ‘N Night Fun Fest, and Shakespeare in
the Park. While the community is generally satisfied
with Memorial Park’s event offerings, input from all
methods of outreach suggested that spaces for large
outdoor events should be expanded or upgraded,
including an improved amphitheater to make events
in Cupertino even better.
According to outreach results, the community
would also like Memorial Park to offer a variety of
comfortable, flexible spaces to hold intimate private
gatherings and socialize with friends and family.
To address the lack of shade and other layout
issues contributing to underutilization of existing
picnic areas in Memorial Park, community outreach
participants requested improved picnic areas and
more social gathering spaces throughout the park.
According to outreach responses, the addition of
shade elements was important for picnic areas, as
well as other park settings. Expanding the tree canopy
was a popular option to increase overall shade in
Memorial Park. Participants also favored shade
structures, e.g., gazebos, canopies, and shade sails, to increase available shade at playgrounds, picnic areas,
and event spaces, allowing social activities to take
place more comfortably and more frequently.
Image C-8: Shakespeare in the Park
“ ”
It is a lovely park, but the best feature
is the amphitheater, and I love
to attend the annual Shakespeare
in the Park performances.
“ ”
New BBQ spots with shade
would be fantastic.
“ ”
Park layout can be improved for
festivals and gatherings.
OUTREACH PARTICIPANT QUOTES
Image C-9: Shaded Picnic Area
-
I I
I • I
I
I
I
I I
I •
Appendix C Community Engagement Data C-15
Design Process
Data from the initial outreach findings led to the
development of three unique design alternatives for
community review and feedback. When creating
the preliminary concept plans, the design team
considered public input and other information
collected about all aspects of the park, including
accessibility, connectivity, sustainability, safety,
recreation, and community wellness. Each park
concept was inspired by one of the three identity
scenarios—Civic Event Space, Community
Gathering Space, and Natural Site and Park—
highlighted in the Parks and Recreation System
Master Plan and focused on specific park features
related to the concept’s affiliated scenario. However,
in alignment with outreach results from Round 1, all
three concepts contained some aspects of each park
identity scenario, blending community, civic, and
natural elements in their designs.
Although the specific layouts varied by concept, the
following features were included in all three designs:
•
P
assive garden walk with native plant areas,
tree groves, pathways, interpretive signage, and
shaded picnic areas
•
P
layground
•
Ev
ent lawns and event plaza
•
Picnic areas, individual and group with shade
•
Relocated/upgraded restrooms
•
Enhanced entry
•
Additional trees
•
Additional cherry tree grov
es
•
Additional planted areas
•
Network of multi-use pathw
ays
•
Bike connections
•
Additional parking and drop-off areas
In
all three preliminary concepts, several existing
park features were to remain unchanged:
•
Quinlan Community Center
•
Cupertino Senior Center
•
V
eterans Memorial
•
Historic Gazebo
•
Cell Tow
er
•
Memorial Trees
See full details of the three concepts in
Appendix D.
Image C-10: Open House Participants Reviewing Concepts
Image C-11: Quinlan Courtyard Cherry Trees
Image C-12: Cupertino Senior Center
-
C-16 Memorial Park Specific Plan
Concept A: Community Focus
Concept A offered a wide range of community-
oriented activities while balancing the natural and
civic elements of the park. The focal point of this
concept was a large, multi-age play area (on the site of the current softball field) with a variety of recreation amenities, including an expanded playground, three
dedicated pickleball courts, games (e.g., bocce, ping
pong), an outdoor fitness station, and a bike traffic
garden. The design also featured a large passive
garden walk in the center of the park, as well as
two event lawns and an event plaza. An upgraded
amphitheater remained in its current location.
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
SITE PLAN
1 Enhanced Entry
2 Event Lawn
3 Event Plaza
4 Relocated/Upgraded Restrooms
5 Upgraded Amphitheater
6 Passive Garden Walk
7 Picnic Area with Shade
8 Group Picnic Area with Shade
9 Relocated/Expanded Playground
10 Bike Traffic Garden
11 Fitness Stations
12 Table Games (e.g., chess, ping pong)
13 Bocce Ball Court
14 Dedicated Pickleball Courts
15 Dedicated Tennis Courts
16 Quinlan Courtyard as Event Space
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
Anton Way
16 15
1 1
1 1
1 1
9 10
12 11
12 13
14 7
8 5
4 4
3 6
2 2
0 50’ 100’ 200’ Image C-13: Playground, Multi-age
Image C-14: Group Picnic Area
Figure C-12: Concept A - Community Focus
-
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
=
111111
Appendix C Community Engagement Data C-17
Concept B: Nature Focus
Concept B expanded and enhanced the park’s
natural elements and blended them with other civic
and community-oriented spaces. An educational
garden zone and a nature playground enhanced
the southern portion of the park and created an
expansive area focused on engagement with the
natural world. This design featured an upgraded
amphitheater in its current location and retained the
existing softball field. A new event lawn and event
plaza were included in the design, which connected
to the Quinlan event lawn via a passive garden
walk. Four dedicated pickleball courts replaced one
existing tennis court.
Image C-15: Educational Garden Zone
Image C-16: Passive Garden Walk
0 50’ 100’ 200’ 9 14
1312
10 11
11 8
7 7
4 4
2 3
1 1
1 1
6 5
SITE PLAN
1 Enhanced Entry
2 Educational Garden Zone
3 Nature Playground
4 Relocated/Upgraded Restrooms
5 Upgraded Amphitheater
6 Event Plaza
7 Event Lawn
8 Passive Garden Walk
9 Softball Field (Existing)
10 Group Picnic Area with Shade
11 Picnic Area with Shade
12 Dedicated Tennis Courts
13 Dedicated Pickleball Courts
14 Quinlan Courtyard with Seating
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
Anton Way
Figure C-13: Concept B - Nature Focus
0 0
0 0
0 0
0 0
0 0
0 0
0 0
c:::::J
111111
-
C-18 Memorial Park Specific Plan
Concept C: Civic Focus
Concept C enhanced opportunities for civic
engagement while integrating nature and
community-oriented elements of the park. A major
feature of this concept was a relocated and expanded
amphitheater on the site of the current softball field.
Adjacent to the amphitheater, a passive garden walk
led to an upgraded playground in its current location.
Two event lawns, an event plaza, and an interactive
cultural exhibit area provided a variety of spaces for
festivals, performances, and other large-scale public
activities. The six existing tennis courts featured dual striping for tennis and pickleball use.
Image C-17: Interactive Cultural Exhibit Area
Image C-18: Event Lawn
Figure C-14: Concept C - Civic Focus
5 3
4 7
1 1
5 6
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
Anton Way
SITE PLAN
1 Enhanced Entry
2 Senior Center Deck as component of
Entry Plaza
3 Event Lawn
4 Picnic Area with Shade
5 Relocated/Upgraded Restrooms
6 Interactive Cultural Exhibit Area
7 Event Plaza
8 Passive Garden Walk
9 Group Picnic Area with Shade
10 Upgraded Playground
11 Relocated/Expanded Amphitheater
12 Dual-Use Tennis and Pickleball Courts
13 Quinlan Courtyard as Plaza
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
3 1
11 13
12 9
18 10
1 2
0 50’ 100’ 200’ -
0 0
0 0
0 0
0 0
0 0
0 0
0 c::::::i
111111
Appendix C Community Engagement Data C-19
Round 2 Results: Preferred Design
A second round of community engagement collected
feedback about the three preliminary concept plans
to inform the development of a preferred design for
Memorial Park. The goal of this round of outreach
was to gauge public sentiment about different concept
features and layouts and determine priorities for the
final concept plan.
Key Themes & Features
As in the first round of outreach, the community
showed strong support for play-based and active
recreation elements, nature spaces and experiences,
and areas for social gatherings and community
activities. Features such as the passive garden walk,
playgrounds, pickleball courts, and amphitheater
ranked as favorite elements of each of the three
concepts.
Play
Play amenities for children are highly important
to park users. During the second round of public
engagement, the community supported an improved
playground experience at Memorial Park. Playground
elements ranked highly in feedback provided about all
three concepts. The upgraded playground (Concept
C), relocated/expanded playground (Concept A),
and nature playground (Concept B) all finished in
the top 10 for most important elements to include in
the final concept plan. The nature playground, which
was very popular in Round 1 outreach, continued to
be a community favorite—in Round 2, it received the
most total votes for any concept feature. Comments
provided by some outreach participants suggested
that the park design should include two playground
Figure C-15: Nature Playground - Most Total Votes for Favorite Concept Feature (Round 2 Survey, Question 3)
Create a BMX park or something where
kids can ride their bikes!
“
Love the inclusive and accessible
ideas presented!
“
”
Playgrounds are very important.
I really liked the nature playground
concept as it is unique, different from
other playgrounds around the area.
”
OUTREACH PARTICIPANT QUOTES
OUTREACH PARTICIPANT QUOTES
TOP 10
MOST
IMPORTANT
FEATURES
FOR THE FINAL
DESIGN OF
MEMORIAL PARK
All Outreach Methods
185PASSIVE GARDEN WALK
DEDICATED PICKLEBALL COURTS
RELOCATED/UPGRADED RESTROOMS
UPGRADED PLAYGROUND
PICNIC AREA WITH SHADE
ADDITIONAL TREES
UPGRADED AMPHITHEATER
RELOCATED/EXPANDED PLAYGROUND
NATURE PLAYGROUND
GROUP PICNIC AREA WITH SHADE
177
174
173
164
150
139
135
127
total
number
of votes
111
Figure C-16: Top 10 Most Important Features for the Final Design of Memorial Park (Round 2 Outreach) -----. L
IHI~
·ftr
al
rti
-~
~
,'P~
~
I
I
MOST TOTAL
VOTES
FOR FAVORITE
CONCEPT FEATURE
-
I
•
C-20 Memorial Park Specific Plan
areas, as currently featured on the site, and should
expand inclusive play opportunities.
Active Recreation
In addition to playgrounds, the community would
like Memorial Park to provide a variety of active
recreation amenities. Survey respondents selected
“recreation amenities for all ages and abilities” as
the top reason for their preferred concept choice.
Pickleball courts, which can be used by youth and
adults of all ages, finished in the top five for the most liked feature of each of the concept alternatives, and
according to survey results, dedicated pickleball
courts were voted the second most important feature
to include in the final park design. Tennis courts were also highly rated features of all three preliminary
concept plans. Overall, the community preferred
dedicated pickleball courts at Memorial Park rather
than dual-use tennis/pickleball courts. Basketball,
softball, and volleyball amenities were also supported
by some outreach participants.
“
”
What a great opportunity here.
I’m a big fan of the Pickleball courts.
Also, more shade for walking,
sitting, and picnics.
Image C-19: Dedicated Pickleball Court
Figure C-17: Recreation Amenities for All Ages & Abilities - #1 Reason for Concept Choice (Round 2 Survey, Question 8)
“ ”
Please create dedicated
pickleball courts for this growing sport
that brings young and old together!
Create a BMX park or something where
kids can ride their bikes!
“
Love the inclusive and accessible
ideas presented!
“
”
Playgrounds are very important.
I really liked the nature playground
concept as it is unique, different from
other playgrounds around the area.
”
OUTREACH PARTICIPANT QUOTES
OUTREACH PARTICIPANT QUOTES
-
I
I
I
I
I
I
I
•
I
I
I
■
#1
REASON
FOR CONCEPT
CHOICE
Appendix C Community Engagement Data C-21
Nature
Nature has been a key component of Memorial Park’s
history, and the Cupertino community continues to
value nature-oriented park spaces. A passive garden
walk was a highly desired feature for the park’s future design. According to the online survey, this expansive
natural area featuring trees, plants, pathways, and
shade finished in the top five for all three concepts and received the highest number of total votes for most
important feature to include the final concept plan.
Survey participants selected “nature experience” as
the second most supported reason for choosing their
favorite concept overall. The survey’s open-ended
comment responses about green space, nature, trees,
shade, sustainability, plants, and climate change
illustrated a community preference for natural and
environmental park components.
Figure C-18: Nature Experiences - #2 Reason for Concept Choice (Round 2 Survey, Question 8)
Image C-20: Passive Garden Walk
“
”
Providing more shade and nature
elements to the park will definitely
make it feel more welcoming and
relaxing for families and their children...
OUTREACH PARTICIPANT QUOTES
I
I
#2
REASON
FOR CONCEPT
CHOICE
-
I
■
C-22 Memorial Park Specific Plan
Concept Priorities
Results from Round 2 outreach revealed the
community’s preferences and priorities for Memorial
Park’s design. In general, the community preferred
a balance of passive and active amenities, including
play, social gathering, fitness, nature, and civic
engagement, and favored the concept plan that best
reflects those priorities.
With 50% of votes from all outreach activities, Concept A: Community Focus was the overall preferred option.
Online survey participants preferred the relocated/
expanded playground included as part of the multi-
age play area on the site of the existing softball field.
Concept A was also the only preliminary concept plan
for which pickleball ranked in the top three favorite
features, per survey votes. The dedicated pickleball
courts located in the multi-age play area finished as
the third most liked feature of this concept.
The top reasons survey participants chose their
favorite concepts highlighted Memorial Park’s key
themes of recreation, play, social gathering, and
nature. When identifying the most liked aspect
of Concept A, the preliminary concept plan most
preferred by the community, survey participants
selected options that aligned most closely with the
concept’s focus on community recreation and play.
When asked to select the most important features
across all preliminary concept plans to be included
in the final design, the community again focused
on a unique combination of play-based recreation,
nature elements, and social amenities. The nature-
focused passive garden walk topped the list, while
playgrounds and pickleball courts also received
significant support from outreach participants. To
improve opportunities for gatherings and public
events, the community prioritized shaded picnic
areas and relocated/upgraded restrooms that are
more accommodating to users in various areas of the
park.
IDENTIFY YOUR
PREFERRED CONCEPT
50%
13%
37%
CONCEPT A:
COMMUNITY FOCUS
CONCEPT B:
NATURE FOCUS
CONCEPT C:
CIVIC FOCUS
All Outreach Methods
TOP 5 ANSWERS FOR CONCEPT A
WHAT DO YOU LIKE MOST ABOUT
YOUR PREFERRED CONCEPT?
1 IT HAS RECREATION
OPPORTUNITIES FOR
ALL AGES & ABILITIES
3 2
4 5
IT HAS PLAY SPACES
& EXPERIENCES I LIKE
IT HAS RECREATION
ELEMENTS THE
COMMUNITY NEEDS
IT OFFERS DESIRABLE
PLACES TO HANG
OUT AND HAVE FUN
IT CREATES OPPORTUNITIES
FOR SOCIAL GATHERINGS
& COMMUNITY ACTIVITIES
Online Survey
Figure C-19: Preferred Concept Breakdown (Round 2 Outreach) Figure C-20: Top 5 Answers for Preferred Concept A
(Round 2 Survey, Question 8)
“
Please make expanding and
upgrading the playground a priority.
”
OUTREACH PARTICIPANT QUOTES
-
I
I
I
•
■
■
■
Appendix C Community Engagement Data C-23
Preferred Concept Plan
Feedback from the community, as well as City
staff and commissioners, was synthesized into the
preferred concept plan for Memorial Park. This
design used Concept A—the favorite concept from
Round 2 outreach—while blending some of the most
popular features from Concepts B and C into a single
plan that cohesively serves the diverse needs of the
community.
The preferred concept plan features a large multi-
age play area with a relocated/expanded playground
and three dedicated pickleball courts on the site of
the current softball field, as shown in Concept A.
One full-size basketball court, a recreation amenity
frequently suggested by the community during
both rounds of outreach, was added to the design.
The preferred concept plan also incorporated a large
passive garden walk (popular in all three preliminary
concept plans) in the center of the park, a nature
playground, an upgraded amphitheater, multiple
event lawns, a variety of picnic areas, and numerous
other features.
In June 2023, the preferred concept plan was presented
to City Council and the public. At this meeting,
supporters of the softball field vocalized opposition
to the removal of the amenity as proposed. Public
comments discussed the benefits of the softball
field to the mental and physical wellbeing of the
players, while expressing concern that removing
the softball field would deny valuable recreation
opportunities to people in Cupertino. Other public
participants endorsed the preferred concept plan as
shown, citing the significant outreach efforts that
informed the preferred concept plan and the softball
field’s consistently low ranking during that process.
Participants noted that the various new proposed
amenities would expand passive and active recreation
opportunities and would be used by a broader scope
of the community.
In consideration of the numerous requests made by
softball supporters to keep the softball field, City
Council voted to approve the preferred concept plan
with the condition that the softball field remains in its current location and new features formerly proposed
for that area are relocated.
“
Excited about [the] updated
amphitheater! My favorite Cupertino
events are the summer concerts
in Memorial Park.
“ ”
I’m happy with all of these concepts.
Looking forward to seeing how the
park evolves.
”
“ ”
All concepts look amazing and I am
excited about the plans that the city
has for this park!
OUTREACH PARTICIPANT QUOTES
Image C-21: Amphitheater
Image C-22: Basketball Court
-
I
I
I
• I
I I
I
I
I I
I
C-24 Memorial Park Specific Plan
Revised Preferred Concept Plan
A revised preferred concept plan was posted online
for public review in August/September 2023. In the
updated design, the softball field remained in its
existing location, in place of the previously proposed
multi-age play area. Several park amenities, including
the playground, passive garden walk, basketball
court, and pickleball courts, were relocated to other
areas of the park. The revised preferred concept
plan featured four dedicated pickleball courts at the
southeast corner of the park along Anton Way. During
the public comment period, the local pickleball
community indicated that the proposed number of
pickleball courts was insufficient to accommodate
the growing demand for this amenity. As a result,
the number of pickleball courts increased to a total
of eight.
Figure C-21: Preferred Concept Plan Presented at the June 2023 City Council Meeting Image C-23: Existing Softball Field
Image C-24: Dedicated Pickleball Courts
-
SITE PLAN
CD Event Lown
® New Parking Lot
0 Relocated/ Upgraded Re,troom
0 Expanded Senior Cente r Courtya rd
® 8occe Court
© Nature Playground
0 Enhanced Pede strian/Bike Access
® Veterans Memoria l
® Up,i rode d Amphllheoler and Sloge
@ Gotebo Picnic A1eo
J
@ Posslve Gorden Wolk
0, @ Playground {2-5. S-12, Tricycle Track )
.li
~ @ New Restroom -"'
i @ Ba,kelball Court
@) Pickleball Court>
@ Otl-Leash Dog Nea {fenced)
@ Ex.isling Tennis Courts
@ Reservoble Picnic Area
@ Upgraded Quinlan Courtyard
@ Exlsling Parlcing Loi
Proposed Trees Existing Trees
Stevens. Creek Bouk,vad ~ 0 80' 160' 320'
~-.~
Appendix C Community Engagement Data C-25
Round 1 Survey Question 1: How often do you or members of your household visit Memorial Park? Please select one.
Answer Options English Mandarin All Responses
Daily 130 1 131
Weekly 215 8 223
Monthly 169 5 174
Occasionally (once every 3 months) 232 5 237
Rarely (once a year) 109 2 111
I don't know about Memorial Park and have never visited 3 0 3 Total 858 21 879
Table C-2: Round 1 Survey Question 1 Results
Round 1
Survey Results
Duration: September 13 - October 9, 2022
Figure C-22: Round 1 Survey Question 1 Results
Ql. How often do you or members of your household visit Memorial Park?
Please select one .
Daily
Weekly
Monthly
Occasionally (once every 3 months)
Rarely (once a year)
I don't know about Memorial Park and have never visited I 0 so 100 150 200
■ English ■ Mandarin
-
250
C-26 Memorial Park Specific Plan
Round 1 Survey Question 2: With whom do you or members of your household visit Memorial Park? Select all that apply. If we missed who you visit a park with, please write it in ‘Other’.
Answer Options English Mandarin All Responses
By oneself 293 2 295
Immediate family member(s) (i.e., child, parent, sibling, partner) 652 18 670 Extended family member(s) (i.e., cousin, grandparent) 111 3 114 Pet(s) 188 11 199
Friend(s) 341 2 343
Co-worker(s) 35 0 35
Organized group (i.e., civic organization, volunteer group, or sports team) 97 0 97
Other (please specify) 13 0 13
Total 1,730 36 1,766
Write-in Responses for ‘Other’
Had played on court 2…for pickleball when court was striped for it usage. But stop has there was no designated times or priority given for pickleball. Also no nets provides by city as expected. Could have use nets at Cupertino sports center if still available. Otherwise, needed to bring own nets to setup.
School Program
Veterans Day Ceremony
Pickelball
tennis
Shakespeare in the Park
Event
Cupertino Symphonic Band member/performer. Outdoor band rehearsals there during 2020, 2021.
Outdoor events held at the park.
old friends
Don't visit it
Bike safety classes
Table C-3: Round 1 Survey Question 2 Results
-
Appendix C Community Engagement Data C-27
Figure C-23: Round 1 Survey Question 2 Results
-
Q2. With whom do you or members of your household visit Memorial Park? Select all that apply. If we missed who you visit a park with, please v,,rite it in 'Other'.
By oneself
Immediate family member(s) (I.e., child, parent, sibling, partner) Extended family member(s) (i.e., cousin, grandparent) - Pet(s)
Friend(s)
Co-worker(s) ■
Organized group (i.e., civic organization, volunteer group, or sports team) - Other (please specify) I
0 100 200 300 400 500 600 700
■ English ■ Mandarin
C-28 Memorial Park Specific Plan
Round 1 Survey Question 3: Why do you or members of your household visit Memorial Park? Select all that apply or write in your reason to visit Memorial Park in ‘Other’.
Answer Options English Mandarin All Responses
Participate in an organized sport event (softball, tennis, etc.) 126 2 128 Connect with nature 369 12 381
Playground 209 13 222
Sports play (not league organized) 120 1 121
Gathering with friends and family 349 9 358
Exercise individually 220 8 228
Walk or bike for exercise (individual or group) 376 10 386 Walk with your dog 195 2 197
Visit the Veterans Memorial or other special features 113 3 116 Attend a special event (performance or festival) 481 11 492 Participate in a recreation program or class 102 6 108
Visit Cupertino Senior Center or Quinlan Community Center 222 5 227 Other (please specify) 45 0 45
Total 2,927 82 3,009
Write-in Responses for ‘Other’
Farmers market
Play Pokémon
Scouts
get together with friends
Picnic on the lawn or look at ducks on the pond
Farmers market
To meet and walk with a friend
The unique water and islands design.
Farmers Market
Farmers Market, play Pokemon Go
Play Pokemon Go.
Farmers market
walk
Get away from work. A place to enjoy the trees. I love all the greenery. Please add more. I've lived in Cupertino for 12 years, went to De Anza and would love more nature.
Table C-4: Round 1 Survey Question 3 Results
-
Appendix C Community Engagement Data C-29
Write-in Responses for ‘Other’ [continued]
Get away from work. A place to enjoy the trees. I love all the greenery. Please add more. I've lived in Cupertino for 12 years, went to De Anza and would love more nature.
Tennis!
If there was a gated area for small dogs I would go.
Farmers market
Traverse through park as part of neighborhood walks
I don't visit
Farmers mkt
Play Pokemon GO
Farmers market (before it moved to Deanza)
Cub scouts
Wedding in 1981
walk to Deanza college through shaded paths. bird watching A place to go and hang out while waiting for kids to finish their program in the Cupertino Rec. Center.
Farmer's market, when it was at Memorial Park
suggest a fun, healthy place for kids on wheels (skate, BMX, scooter, bike etc). Maybe something like the awesome facilities at Lake Cunningham or Truckee: https://www.sanjoseca.gov/Home/Components/FacilityDirectory/Fac ilityDirectory/2251/2028 https://www.truckeebikepark.org "used to ride my trials bike (see Jack Carthy on Youtube for reference) on the rocks in the pond area. It's a great meditative sport that's non-destructive and helps me to manage my anxiety. It's also how I often spend time with my friends, and teaching new riders basic bike handling skills." bicycle trials
"Walk the dog there. He loves the park! PLEASE continue to let residents walk their their dogs there! I always bring my own doggy bag for Duke's deposits, instead of using the poop bags that I am glad the park offers on stands" "to talk with friends, there is open space, can talk loud, nice environment" farmer's market
to talk with old friends
Youth program activities and nerf games
Playing Pokemon Go
Don't visit use the park close to home Jollyman
Play Pokemon Go
Farmers market
go to the weekly farmers market on Sundays when it was there Events with my old camp counselor
Table C-5: Round 1 Survey Question 3 Results (cont.)
-
C-30 Memorial Park Specific Plan
Write-in Responses for ‘Other’ [continued]
Farmers Market
Farmers Market
photography
Works at the softball field.
Have a picnic lunch using the picnic tables
Farmer's market
Table C-6: Round 1 Survey Question 3 Results (cont.)
-
Appendix C Community Engagement Data C-31
Figure C-24: Round 1 Survey Question 3 Results
-
Q3. Why do you or members of your household visit Memorial Park? Select all that apply or write in your reason to visit Memoria l Pork in 'Other.' Participate in an organized sport event (softball, tennis, etc.) Connect with nature
Playground
Sports play (not league organized)
Gathering with friends and family
Exercise individually
Walk or bike for exercise (individual or group)
Walk with your dog
Visit the Veterans Memorial or other special features - Attend a special event (performance or festival)
Participate in a recreation program or class -
Visit Cupertino Senior Center or Quinlan Community Center Other (please specify) -
0 100 200 300 400 500
■ English ■ Mandarin
C-32 Memorial Park Specific Plan
Round 1 Survey Question 4: How do you or members of your household get to Memorial Park? Select all that apply or tell us how you get to Memorial Park in ‘Other’.
Answer Options English Mandarin All Responses
Car 687 15 702
Rideshare services 1 5 6
Via - Cupertino Shuttle 8 1 9
Bus 11 8 19
Bike 170 0 170
Scooter or skateboard 26 0 26
Walk 350 0 350
Other (please specify) 7 0 7
Total 1,260 29 1,289
Write-in Responses for ‘Other’
Jog/run
run, jog
rollerblade
run
"I use cars. But it's hard to find parking lot. I believe there are two or three now. Can we use Quinlan community center parking lot to go to Memorial Park? The west side parking lot is not user friendly as there are spaces but the sign says it's reserved for senior center users. All the parking spaces can be used first come, first served basis except parking spaces for the people with disability."
If I did it would be by cat
Run
Table C-7: Round 1 Survey Question 4 Results
-
Appendix C Community Engagement Data C-33
Figure C-25: Round 1 Survey Question 4 Results
-
Q4. How do you or members of your household get to Memorial Park? Select all that apply or tell us how you get to Memorial Park in 'Other'.
Car
Rideshare services
Via - Cupertino Shuttle I
Bus
Bike
Scooter or skateboard ■
Walk
Other (please specify) I
0 100 200 300 400 500 600 700
■ English Mandar in
C-34 Memorial Park Specific Plan
Round 1 Survey Question 5: What features do you like most at Memorial Park? Please select your top three choices or write in your favorite item we missed in ‘Other.’ Answer Options English Mandarin All Responses
Playgrounds 201 12 213
Softball Field 31 1 32
Tennis and Dual-Striped Pickleball Courts 141 4 145
Lawn Space for Informal Use 301 7 308
Natural Area and Trees 449 8 457
Walking Paths 471 7 478
Picnic and BBQ Areas 75 2 77
Benches for Seating 85 4 89
Amphitheater 205 8 213
Festivals and Events 259 8 267
Monuments and Memorials 39 1 40
Use of Recreation Facilities 37 0 37
Other 36 0 36
Total 2,330 62 2,392
Write-in Responses for ‘Other’
TaiChi with a group
I do not like the fact that the ponds and water areas are gone. It seems like the water could be recycled .....or something.
At least have some kind of water feature.
Pokestops in Pokémon Go
Water and islands.
add pickleball courts.
Amphitheater for group meetings
Need dedicated pickelball courts
A garden or water park for kids
We did love the ponds and have not been going lately because there was no water feature None As husband and i see this site has perfect for an Olympic size year round pool and aquatic center. There is no such swimming options in Cupertino. Cupertino has golf, tennis, ball fields, ice skating, but no olympic size pool. We have blackberry farm fir 8 weeks in thr summer, but its not designed for lap swimming. Or only option is Fremont HS for limited times. We must pay Sunnyvale rates Cupertino doesn’t have such options. We have many parks. Please give residents swimming options
Dog park that is enclosed
Table C-8: Round 1 Survey Question 5 Results
-
Appendix C Community Engagement Data C-35
Write-in Responses for ‘Other’ [continued]
pond feature that is now gone :(
I’m sure this is obvious, but of course having a variety or spaces, as exists now, serving a variety of interests, is best.
Duck pond
I used to enjoy the serenity of the water features(ponds) after stressful days.
Dog Park
Ponds
Bicycle Pump Track
Fountain areas for biking
Bicycle area. Pump Track.
Rocks for riding trials and for the natural terrain aspect. People often watch and ask questions about the sport.
Memorial Park is a trials spot that has been used by riders for the past 20+ years. boulders
Open space
Shade to relax in.
water pond, when it was still filled with water
Artificial Creek: https://www.youtube.com/watch? v=_pGj0qJaDLg&t=1s Chu-chu train: https://www.youtube.com/ watch?v=MaQUYvWaB_k In Cupertino we don't have municipal indoor swimming pool for public. We could build one near Cupertino Sports Center so the residents can use the swimming pool year around for a low fee such as $2-$3.
Senior center
Lake/Pond - this needs to be made active - it is so nice to enjoy waterside picnicking - too bad that we haven’t been making use of the wonderful potential opportunity within 5 min of home. There are already so many natural areas in Cupertino - it is not necessary to make each area natural habitat only - let’s have some variety - every proposal in Cupertino is to make habitats for animals - the park space, playgrounds are not being maintained making it less enjoyable for people to come. The survey presents limited choices for the vision of Cupertino Parks - we should not make this about having green space vs having community gathering space be having a natural habitat. It should be about having all three - these three don’t need ti be collocates. If the creek trail along Lawrence will be expanded to only include natural habitat meant for dog walking and bicycling, then let’s use memorial park for more family friendly items (magical bridges playground, water play area, sensory/musical playground for families with children. Having a man made lake/pond, fountains, water features, etc offers benefits and is an attractive picnicing/get together spot.
The ponds and ducks
Nothing much.
Senior center
Ponds and wildlife
Nature watching
Bicycling classes
Lake and fountain???? Why no more ?????
water feature
Table C-9: Round 1 Survey Question 5 Results (cont.)
-
C-36 Memorial Park Specific Plan
Figure C-26: Round 1 Survey Question 5 Results
-
Q5. What features do you like most at Memorial Park?
Please select your top three choices or write in your favorite item we missed in 'Other'.
Playgrounds
Softball Field -
Tennis and Dual-Striped Pickleball Courts
Lawn Space for Informal Use
Natural Area and Trees
Walking Paths
Picnic and BBQ Areas
Benches for Seating
Amphitheater
Festivals and Events
Monuments and Memorials -
Use of Recreation Facilities -
Other -
0 100 200 300 400
■ English ■ Mandarin
500
Appendix C Community Engagement Data C-37
Round 1 Survey Question 6: Which of these scenarios best describes Memorial Park currently? Answer Options English Mandarin All Responses
Civic Events Space 300 14 314
Community Gathering Space 233 1 234
Natural Site and Park 325 6 331
Total 858 21 879
Table C-10: Round 1 Survey Question 6 Results
Figure C-27: Round 1 Survey Question 6 Results
-
Q6. Which of these scenarios best describes Memorial Park currently? Civic Events Space
Community Gathering Space
Natural Site and Park
0 so 100 150 200 250 300 350
■ English ■ Mandarin
C-38 Memorial Park Specific Plan
Round 1 Survey Question 7: The Citywide Parks and Recreation System Master Plan’s vision for Memorial Park highlights expanding the civic event and community gathering spaces and enhancing natural site and park features. Which scenario would you like emphasized in the future? Answer Options English Mandarin All Responses
Civic Events Space 234 11 245
Community Gathering Space 216 3 219
Natural Site and Park 408 7 415
Total 858 21 879
Table C-11: Round 1 Survey Question 7 Results
Figure C-28: Round 1 Survey Question 7 Results
-
Q7. The Citywide Parks and Recreation Master Plan's vision for Memorial Park highlights expanding the civic event and community gathering spaces and enhancing natural site and park features.
Which scenario would you like emphasized in the future? Civic Events Space
Community Gathering Space
Natural Site and Park
0 so 100 150 200 250 300 350 400
■ English ■ Manda rin
450
Appendix C Community Engagement Data C-39
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Answer Options English Mandarin All Responses
Upgraded amphitheater 352 11 363
New water-play amenities 263 13 276
New recreation amenities 412 12 424
Expanded or upgraded areas for large outdoor events 292 12 304 More large-scale community events 193 5 198
Other (please specify) 165 0 165
Total 1,677 53 1,730
Write-in Responses for ‘Other’
Please update the playground.
1. Shade… a lot of trees for shade. This place is too hot 2. Get rid of the geese and ducks. Too much poop on hardscape and grass areas keeps us away.
Memorial Park needs a better playground.
1) Protected off-leash dog area WITH REAL GRASS (not astroturf or just dirt). Discussion currently around "knoll area" adjacent to Christensen Drive which is not protected and too narrow for dogs. 2) Dedicated pickelball courts (or have a place to store PB nets if using hybrid tennis courts) 3) Move July 4th fireworks back to DeAnza College and make Memorial Park an ideal viewing area for this special event None of the above. Keep it natural; trees, shaded paths for walking, exercise stations, low maintenance plants/flowers.
More collaboration with De Anza College for event parking. Please do not take precious park land for parking.
A nature and animal museum place where kids can go an learn about all kinds of things. History of the valley and the transformation expanding the museum at the the Community Center make it more kid friendly hands on experiences like at the Monterey Aquarium. Why should a park not have such a feature? Area to play with pets
Swimming pool open year round for recreation
None
Dedicated pickleball courts.
Enable smaller groups to have a variety of activiteis concurrently. Setup 4-5 group spaces surrounded by natural shrubbery, plants and flowers where multiple groups can do Yoga, TaiChi, dancing, medication, etc. concurrently.
Separate bike and pedestrian trails Add a Skate park?
Walkways that do not include biking.
Keep the islands and water!
Plant more evergreen trees
Table C-12: Round 1 Survey Question 8 Results
-
C-40 Memorial Park Specific Plan
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
An often overlooked focus of gathering places is to share food together. So it's important to incorporate picnic tables or other elements where people can sit and gather to eat lunch or a snack or coffee. It's a stretch, but is there any way to include a space for a coffee shop vendor, as we have in the library building? This by itself would attract more visitors.
Maybe as part of a Senior Center improvement?
Water feature but in a conservative and sutainable way, eg small shaded ponds or artifical river.
More trees, walking paths, park should be oriented around nature, a peaceful place for people to relax. There are already too many events in this park.
No more development. General purpose park space is fine.
More Tennis courts
More tennis courts
more tennis courts
Skatepark
Dog area
bike and EV charging stations
Space for outdoor classes. Could be a duo space of amphitheater and outdoor class space pickleball courts
More tennis courts
Dedicated pickleball courts
Pickleball courts
More pickleball courts
Pickleball courts
"More dedicated pickleball courts please, Cupertino is far behind other cities." A lot of pet parents( like myself ) like to exercise their dogs in the park. It had been a great mental health boost for us during the pandemic and beyond. It would be nice to have a dedicated space for this purpose.
Please keep the beautiful Cherry Blossoms. We come every year to enjoy them. We also love attending the Cherry Blossom Festival. We also enjoy the tennis courts.
basketball courts
Pickleball courts Needs large trees
Dedicated pickleball courts with lights.
Off leash Dog area
Dog park area
Natural areas. Please do not use round up or other chemicals.Drought tolerant landscape in non softball/soccer areas.
Table C-13: Round 1 Survey Question 8 Results (cont.)
-
Appendix C Community Engagement Data C-41
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
Remove the water features and replace them with natural open space Pickle ball courts
A Garden with flowers
More play equipment for all ages of children
Ponds
Keep it natural and green. Don't add any buildings or structures. There are plenty of events at this park. People come here to enjoy there walks and see family. More attractions will increase People from outside Cupertino. Making it too crowded for locals.
More Tennis!
A dog area for smaller dogs
Would like More separation between sports areas and other areas. Some people practice unsafe habits when playing sports."
Japanese Garden like Hakone
More tennis courts
water pond
MORE grass, MORE trees. Unadulterated open space with trees and grass is increasingly scarce in today's world." Walking paths, rolling hills, bring natural landscape of Cupetino orchards back enclosed area for dogs to play off leash
Open space pet area for dogs to play without a leash
Dual use for the baseball field as dog off-leash area when no game is scheduled. The baseball field is already 75% closed off with fences.
Olympic size pool and aquatic center to fill an unmet neef.
Lap swim pool
More trees, more nature!!!
Lap pool
Off leash dog park
Dog play area
I would like an area devoted to the construction of a simple labyrinth. Studies have proven that it is has an amazing health benefit for all age groups.
No structure. Stay the way it is.
Use of california native plants throughout, with butterfly gardens and signage to promote community understanding of biodiversity
Off leash dog hours
Table C-14: Round 1 Survey Question 8 Results (cont.)
-
C-42 Memorial Park Specific Plan
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
More shade in the meeting areas, especially where the tables are.
Dedicated Pickleball courts
The park already has many areas. I don’t see a great benefit to add more. And I also don’t see a benefit in changing existing facilities that appear to function fine.
Pickle ball courts, bocci ball, places to do activities , basket ball magical bridge
A small serene waterbody near some trees with benches and a walking path around it.
Better playgrounds for kids
None. Nature site and park only.
dog fenced playgroound
Off leash dog park
More parking.
Dog off leash area
"Shaded Bocce Ball Courts for Seniors; similar to the Martinez Bocce Ball facilities!" I'd like to add a comment to my water-play selection: I would love to see water at Memorial Park again, but only if it can be done sustainably.
New and updated playground for preschoolers till middle schoolers Lots of Pickle ball courts please More seating benches for meditation or reading
Can there be a place where local non-profit organizations can hold in-person meetings? Up to about 30 people. For a rental fee. Or a place where a local non-profit organization can hold a larger community event, such as an event with booths, displays, short presentations. Again, for a rental fee. Attendees would enjoy visiting the park's green space, walking areas, paths as part of their visit to the non-profit organization's event. No music for the event, as that disturbs the neighbors and somehow is always too loud.
1) Expanded parking areas (current parking areas too small). 2) Upgraded & remodeled bathrooms. 3) Add new bathroom structure by Amphitheater.
tall trees, draught resistant ground covering, multi-level parking building More trees and shades
Better playgrounds
Quality large scale community events, not more
bmx bike park & skate board park for children. dog running park, things that would brin gin more people more for the teenage kids like a bike and skateboard park like the awesome one San Jose has at Lake Cunningham:
https://www.sanjoseca.gov/Home/Components/FacilityDirectory/Fac ilityDirectory/2251/2028 Designated bike space, trails
Table C-15: Round 1 Survey Question 8 Results (cont.)
-
Appendix C Community Engagement Data C-43
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
Bike/skateboard park like Lake Cunningham
Beginner and intermediate friendly bike park, bmx riding area with jumps Bike park
Bike track/ pump track
Bike park or skate park that allows scooters
I'd love to see a bike park included in this space. Something along the lines of Truckee bike park (https://www. truckeebikepark.org) or Valmont bike park in Boulder (https://bouldercolorado.gov/locations/valmont-bike-park) Bike park
suggest a fun, healthy place for kids on wheels (skate, BMX, scooter, bike etc). Maybe something like the awesome facilities at Lake Cunningham or Truckee: https://www.sanjoseca.gov/Home/Components/FacilityDirectory/Fac ilityDirectory/2251/2028 https://www.truckeebikepark.org bike park
Bike and/or skate park.
Bicycle pump track, skateboard opportunities
Something like a bike park
more designated pickle ball courts, please.
Rocks and more natural terrain like trees and draught-resistant plants (less grass = less water). Literally some boulders scattered around like we had before would be awesome!
Upgraded playground for all abilities like magical bridge
1. Artificial Creek and Mini-Size Shallow Ponds (4) 2. Picnic Tables alongside the trees near Quinlan Community Center (about 10) in the shade of the tall trees. Barbeque stands (about 10) at where it's currently a row of parking space next to the walkway next to the trees. 3. Enforce the policy of ""Take home your own garbage"" so that people don't litter after barbequing and picnic. Still, keep the minimum number of trash/recyclable/compost bins so that those who don't have home can throw away garbage there. 4. Specific bike ride lane surrounding the park so that bikers can ride bike freely and also children can practice riding bike there safely with parents.
Dedicated pickleball courts like those in Sunnyvale
a nice place (sanctuary) with trees and greenery - away from the overgrowth we are seeing of multilevel buildings replacing one story buildings and businesses
better sports facilities, basketball courts and soccer fields in particular. Both are great for pickup games between friends and strangers
Community garden
4 Dedicated Pickleball courts with lights
More trees please.
refill the water pond
Table C-16: Round 1 Survey Question 8 Results (cont.)
-
C-44 Memorial Park Specific Plan
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
more tennis courts
1. Artificial Creek: https://youtu.be/_pGj0qJaDLg 2. Chu-chu Train: https://www.youtube.com/watch?v=MaQUYvWaB_k
3. A Circle Fountain where people can sit: about 30 people In the night, it could light up, just a little, as conservative as a city light. 4. More Inviting Parking Lots 5. More Picnic Tables in Shades 6. More Barbeque Grilling Stands 7. More Eye- Pleasing Trees and Shrubs such as: 1. Blue Jacaranda (purple) 2. Silk Floss tree (pink) 3. Golden Dewdrop 4. Cuban Gold Duranta Shrub
Bocce ball
As a long-time Cupertino resident and new pickleball player, I’d love to see dedicated pickleball courts in Memorial Park. This would alleviate the competing space of tennis and pickleball players while creating a community-inclusive sports option.
Pickleball courts
1. Big children playground similar to the magical bridge in Palo Alto more options for kids--an even bigger playground more options for teenagers--a skateboard park and teenager-specific play areas like outdoor E-sports kiosks and outdoor classes for teens (teen dance classes; teen obstacle courses Outdoor workout equipment (pull-up bar, parallel bars, etc.) More space for outdoor meditation, QiGong and such.
Dog off leash area
Restaurants, shops, water slides and theme park.
need greater variety of trees and shrubs, native plant garden I don't think the park needs upgrading. The park does not need any additional features. I don't belong to any groups that "gather" in the park.
1) Learn-to-ride bike lessons offered through the Rec Center and taught on a space at Memorial Park that is conducive to bike lessons. 2) A shed with a fleet of bicycles of varying sizes. The fleet could serve a few purposes: - community members could rent a bike as part of the Rec Center's bike lessons mentioned above - Cupertino schools could reserve a suite of bikes to accommodate each 3rd or 4th grade class for a bike lesson field trip to a Memorial Park Bike Garden (explained in my answer to question #9 below) - Ideally schools in other cities would also be able to reserve the fleet and book a bike field trip too to the Memorial Park Bicycle Garden too. This could be a way for the City to generate money. Measure B funding could be used to purchase and maintain the fleet of bicycles. If we make the education available to other cities, we could ask the County if they would be willing to contribute some of their Measure B funding as well to purchase and maintain the bicycle fleet and contribute towards bicycle education.
Shaded picnic areas
Upgrade the playgrounds to have shade covering please!
No pickle markings on the tennis courts.
Space for outdoor exercise classes
Informal sports facilities, such as a futsal court (small soccer court that could be soft or asphalt), or skatepark (there are already many basketball courts at schools etc)
Table C-17: Round 1 Survey Question 8 Results (cont.)
-
Appendix C Community Engagement Data C-45
Round 1 Survey Question 8: Which civic event space features would you most like to see included at Memorial Park? Please select your top three choices or write in your ideal feature(s) in ‘Other.’ Write-in Responses for ‘Other’ [continued]
Fewer events
more walking paths, meditation area
dog park
Lawn and trees.
Better designed biking paths
Upgrade the softball field (dugout, scoreboard, evening lights) Trees
Upgraded softball field.
The duck pond
Waking area with interest. Parking?
Feed the duckies
Native Landscaping
walking trails & off leash dog area
Maybe badminton courts, bocci ball
More natural habitat, somewhere to relax and enjoy nature and find peace and quite More flowers that you can pick to put by the veterans memorials. dedicated pickle ball courts, more trees and shade
Concentrate on strengths that complement, rather than duplicate, what can be done across the street at De Anza College Upgraded softball field
More useable dedicated pickleball courts with nets that tennis players won't take over. Some pickleball events would be nice
Remove playground by tennis courts and install large updated and unique playground that would draw families from all communities
Upgraded softball field.
Upgraded bathrooms useable by all! They are outdated and gross. All our parks need their bathrooms upgraded. This is a basic need and accessibility issue. Don’t add more stuff. Fix what you have first! Bicycle/traffic garden
Outdoor training area for adults
Anything which does not cut down the lawn
dedicated pickleball courts
farmers market
Table C-18: Round 1 Survey Question 8 Results (cont.)
-
C-46 Memorial Park Specific Plan
Figure C-29: Round 1 Survey Question 8 Results
-
QB. Which civic event space features would you most like to see included at Memorial Park?
Please select your top three choices or write in your ideal feature(s) in 'Other'.
Upgraded amphitheater
New water-play amenities
New recreation amenities
Expanded or upgraded areas for large outdoor events
More large-scale community events
Other (please specify)
0 50 100 150 200 250 300 350
■ English ■ Mandarin
400 450
Appendix C Community Engagement Data C-47
Round 1 Survey Question 9: Which community gathering space features would you most like to see included at Memorial Park? Please select your top four choices or write in your ideal feature(s) in ‘Other.’
Answer Options English Mandarin All Responses
New universal or all-inclusive amenities 242 15 257
Expanded gathering areas adjacent to the Senior Center 112 6 118 Expanded gathering areas adjacent to the Community Center 141 3 144 Connect the park to adjacent bike trails and bike lanes 386 7 393 Improved accessibility and inclusiveness 119 1 120
More social gathering spaces (seating for small to medium groups) 323 6 329 More activities and amenities for all ages and abilities 342 3 345 More parking 233 7 240
More community-based monuments and memorials 49 3 52
Public art 180 8 188
Outdoor classrooms 86 1 87
Other (please specify) 116 1 117
Total 2,329 61 2,390
Write-in Responses for ‘Other’
More shade allowing for longer and more comfortable gathering
1. Shade… a lot of trees for shade with picnic tables under them. This place is too hot 2. Get rid of the geese and ducks.
Too much poop on hardscape and grass areas keeps us away. 1) Protected off-leash dog area WITH REAL GRASS (not astroturf or just dirt). Discussion currently around "knoll area" adjacent to Christensen Drive which is not protected and too narrow for dogs. 2) Move July 4th fireworks back to De Anza College and make Memorial Park an ideal viewing area for this special event More benches in shade.
Area to play with pets
see item 8
Tennis courts improvements: Upgrade, Increased number
upgraded/added tennis courts
replace the water pond
Tennis courts
A shaded and enclosed dog park
Add pickleball courts please!
Dedicated pickleball courts
Table C-19: Round 1 Survey Question 9 Results
-
C-48 Memorial Park Specific Plan
Round 1 Survey Question 9: Which community gathering space features would you most like to see included at Memorial Park? Please select your top four choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
Dedicated separate pickleball courts
Pickelball
A dedicated dog area where dogs can socialize and play.
Please keep the cherry blossoms.
basketball courts
Dogs off leash area
Pickleball
pickleball courts futsal court/field multi use meaning pickleball nets are not fixed...rather they can be moved for futsal and vice versa LIGHtiNG on tennis, pickle ball, futsal
Dog park
Soccer field. Artificial turf.
Dedicated pickelball courts
A nice swim center like Santa Clara and Sunnyvale have.
A garden with trees and seats under them
Bocce ball
Water features and play equipment
Special needs swings, and activities in the current playground.
More Tennis!
Pickle ball courts
No comment.
Skateboard park
MORE grass, MORE trees. Unadulterated open space with trees and grass is increasingly scarce in today's world.
The Pond. I miss it.
Dual use for the baseball field as dog off-leash area when no game is scheduled. The baseball field is already 75% closed off with fences.
Olympic size pool open year round
dog owners and their dogs gathering are. two (small and bigger dogs) off leash dog to run around Lap swim pool
Space for off leash dog park
DOLA off Leash dog hours
Table C-20: Round 1 Survey Question 9 Results (cont.)
-
Appendix C Community Engagement Data C-49
Round 1 Survey Question 9: Which community gathering space features would you most like to see included at Memorial Park? Please select your top four choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
1. More trees and bushes in general 2. More shade in the table area. It's almost unusable now because who wants to sit under the full sun? 3. More trails or a bit wider trails so that walkers, bicyclists and scooter/rollerbladers could spread out a bit more in the total area. The narrowness of the trail is a problem when using the park as a conduit from Alves Drive to Mary Ave. It's doable but when the park is busy it does not work very well.
It’s not clear to me what the inclusiveness issue is. Perhaps that could be clarified in future communication. The park has a variety of options that seem to cover most people. I definitely don’t and can’t use all of those options, but there appear to be many.
A small serene waterbody near some trees with benches for meeting with friends and winding down with family in the evenings.
A dedicated skateboard / action sports area would be amazing! None. Nature site and park only.
Playground more like Nealon Park in Palo Alto
Dog park
dog fenced playground
Fenced dog off leash area
cement or asphalt pump track
Bocce Ball facilities for Seniors only &/or courts for general as well as reservation (e.g., Senior Center; individual; as well as league) use.
I don't feel strongly about any of the above.
shaded spaces for private picnics. Smaller incline on the amphitheatre seating (to allow chairs and blankets) Outdoor concerts eg like Los Gatos.
multi-story parking structure
Space to play badminton. The only space right now is to book through Cupertino Rec Center and it is always busy.
This would be a great location for an asphalt pump track. It would be great for all ages and different rollling means, bike, skateboard, scooters etc
Dog park. Everyday people bring their Dogs to walk and play. We desperately needa dog park area. bmx bike park & skate board park for children & dog park with fencing Mountain bike/Bmx park
Bike park, like a dirt jump or concrete bmx park
Bicycle pump track please
Bike park
Bike/skate park
I suggest a fun, healthy place for kids on wheels (skate, BMX, scooter, bike etc).
Table C-21: Round 1 Survey Question 9 Results (cont.)
-
C-50 Memorial Park Specific Plan
Round 1 Survey Question 9: Which community gathering space features would you most like to see included at Memorial Park? Please select your top four choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
Bike park
Bike park similar to Calabazas Park
Bicycle pump track, skateboard opportunities
Bike park
more designated pickle ball courts, please.
Bike park of some sort
Pump track, skate park, etc. Something bike related to help boost the bike culture in Cupertino - encourage our community to commute by bike instead of cars.
Need Shade. Also, where landscaping is implemented, please use only CA Native plants Bike recreation park. And a pumptrack.
Dedicated pickleball courts like those in Sunnyvale
New basketball and pickeball courts
basketball courts
More greenspace (grass, not astroturf) Some ponds/water features Community garden
Free dedicated lighted Pickleball courts (at least 4) for open play More restrooms.
refill the water pond
more tennis and basketball courts
Incorporate native plants and trees with places to gather. It is a very unnatural park, and we need more plants and wildness in our lives, not more manicured foreign plants.
Bocce ball courts
How about a tent-covered area or tree shaded area with tables & pickelball courts? Grandstands for seating
I was there in 1976 July 4. Its a piss poor example of underutilized space. A tribute to small minded dept of public functionaries with no leadership and a lack of vision. Compare this large space a European city park or a Mexican park in a small town. Absurd concrete pathways, silly bridges, a few benchs. It is an afterthought. It is as well thought out as downtown Monta Vista and downtown Cupertino.
Don't get rid of the playground
Water features (fountains, waterfalls, well maintained ponds, etc), sensory/inclusive playground (music, water, etc) - we don’t want everything to be native habitat everywhere (there are other ways to enjoy things as a community) More shade
Off leash dog area
Table C-22: Round 1 Survey Question 9 Results (cont.)
-
Appendix C Community Engagement Data C-51
Round 1 Survey Question 9: Which community gathering space features would you most like to see included at Memorial Park? Please select your top four choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
Water ponds and ducks
Restaurants, shops and water park with slides ( not the fast ones).
Outdoor movie space! Disc Golf/Shuffleboard/Bocce Ball other accessible, affordable "sports" spaces.
Nothing new is needed in the park. Please keep the dogs out of the park. 1) A large paved or decomposed granite area (maybe the size of two basketball courts) where bike classes can be held.
We currently use the Senior Center parking lot for this every summer which is not always available, which makes it hard to count on the space being free. 2) A Bicycle Garden where kids can practice bike handling skills and the rules of the road on a mini street without cars, like the one the City of Antioch is designing: https://www.antiochca.gov/ recreation/bicycle-garden/
Natural habitat preservation
none of the above. I prefer keeping the park as mostly a place to enjoy nature. The amount of group spaces, like the tennis courts, softball field, amphitheater and large group picnic area are plenty. More of this would intrude on one's ability to relax and enjoy nature casually.
More picnic areas with trees, more walking paths
upgraded tennis courts and social areas around the courts Gathering spaces next to the Community Center don't need to be expanded, but they need to be improved - more seating etc.
Outdoor classroom but with a physical structure covering for shade (maybe like a pavilion). Maybe include an outlets and outdoor speakers to the covering structure to be used for the classes.
SHADED picnic areas. We had an engagement party there on a hot day and absolutely fried in the sun.
Pond that works
Native Landscaping
Some exercise equipments that can be used by everyone. If you want more details, I can provide some pictures for the types of the exercise equipments.
More natural setting to enjoy nature and relax
Improved/expanded bathrooms
dedicated pickle ball courts, more trees and shade
Gated playground
Bring back its beauty to draw the community in casual pass-through like walks, but please clearly delineate walk vs. bike paths
community vegetable garden
Bicycle/traffic garden
farmers market
meadow, cherry blossom trees
Table C-23: Round 1 Survey Question 9 Results (cont.)
-
C-52 Memorial Park Specific Plan
Figure C-30: Round 1 Survey Question 9 Results
-
Q9. Which community gathering space features would you most like to see included at Memorial Park?
Please select your top four choices or write in your idea l feature(s) in 'Other'.
New universal or all-inclusive amenities
Expanded gathering areas adjacent to the Senior Center
Expanded gathering areas adjacent to the Community Center Connect the park to adjacent bike trails and bike lanes Improved accessibility and inclusiveness
More social gathering spaces (seating for small to medium groups) More activities and amenities for all ages and abilities More parking
More community -based monuments and memorials
Public art
Outdoor classrooms
Other (please specify)
0 so 100 150 200 250 300 350
■ English ■ Mandar in
400
Appendix C Community Engagement Data C-53
Round 1 Survey Question 10: Which natural site and park features would you most like to see included at Memorial Park? Please select your top five choices or write in your ideal feature(s) in ‘Other.’
Answer Options English Mandarin All Responses
Upgraded or new picnic area(s) 234 7 241
New nature-play opportunities 264 14 278
More multi-use paths 280 5 285
Add pickleball striping to all the tennis courts 126 1 127 Upgraded softball field 26 5 31
Multi-use sports fields 106 4 110
Expanded or upgraded native planting areas 252 7 259
More open space or nature areas 310 18 328
More shade by increasing the number of trees 606 6 612
More shade through built structures 166 10 176
Off-leash dog park 148 2 150
Outdoor fitness stations 175 9 184
Sustainable design features and educational opportunities 127 1 128 Native plants and/or demonstration garden 278 0 278
Other (please specify) 102 0 102
Total 3,200 89 3,289
Write-in Responses for ‘Other’
1. Shade… a lot of trees for shade with picnic tables under them. This place is too hot 2. Get rid of the geese and ducks.
Too much poop on hardscape and grass areas keeps us away.
The park can be used for an education source in so many ways Skateboard area
Convert some tennis courts to permanent pickleball courts or add permanent pickleball courts Smaller open areas for group activities (yoga, taichi, etc.) each surrounded by natural flowers, plants, etc. to partially screen them off.
NO OFF LEASH DOG PARK or unleased dogs anywhere.
More water features, fountains; keep the lake and island design! water feature
Water features for human enjoyment and wildlife
we need shaded picnic areas. Currently the picnic areas are too hot in the sun during summer that we have to bring our own tent setup for our large group events. It would like to build a large pergola over the picnic area.
Table C-24: Round 1 Survey Question 10 Results
-
C-54 Memorial Park Specific Plan
Round 1 Survey Question 10: Which natural site and park features would you most like to see included at Memorial Park? Please select your top five choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
A gazebo that a vine would cover for shade
More tennis courts
Would like 4-8 dedicated courts for pickleball. If not a designated time or priority for pickleball on striped tennis pickleball courts….
Add pickleball courts to replace ponds. There is a growing demand for pickleball in Cupertino and I have to drive San Jose and Mt. View to play.
Dedicated separate pickleball courts
Add dedicated pickleball courts
Dedicated Pickleball courts
basketball courts
Off-leash dog park
Dedicated pickleball
futsal courts lighted tennis and pickelball and futsal courts Dedicated Pickleball Courts. I founded the Palo Alto (Mitchell Park Group) now 800+ players. I would be happy to do the same if the park had dedicated courts.
Do not add more pickle ball libes to tennis courts !! There is a limited # of public courts available. Hard for tennis players to call balls in/out with pickle ball lines. Put pickeball lines on cheaper flat areas. Courts cost $5K to pave so a waste to add non-tennis lines when any flat surface can be used. .
Cupertino needs a swim center like Santa Clara or Sunnyvale.
Ponds
More Tennis!
Frequent venches/seating along paths for those that have difficulty with longer walks.
Add solar on top shade through built structures
More rest room with partition between bowl and uriner . Clean restroom Please DO NOT add pickle ball striping to all the tennis courts. It is too hard to play tennis and focus on the lines. ALSO, please fix the timers. People are very aggressive and unpleasant; this gives a chance to point back to when they arrived and who has been there too long.
Add pickleball Courts
A Pond
Pool
Table C-25: Round 1 Survey Question 10 Results (cont.)
-
Appendix C Community Engagement Data C-55
Round 1 Survey Question 10: Which natural site and park features would you most like to see included at Memorial Park? Please select your top five choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
two off leash dog area, for small with mix turf grass and bigger dogs with natural grass. Water outlet (for cleaning, drinking and to cold down human and dog in extra warm sunny afternoon time. Without water outlet many dog owner will not be able to benefit using the hot park through out the day and not crowding near the sunrise orsunset time frame. Thank you.
Lap swim pool
Bocce ball court
Separate fenced areas for large and small dogs to play off-leash on grass. Nearby off-leash dog parks on dirt and pavement regularly results in torn dog paw pads.
A bike route connecting Mary Ave to Alves Drive
Dedicated Pickleball courts
The answers here talk about “more.” I am in favor of a beautiful natural space, with ponds(!), and with some other areas for various activities, generally as exists now. I see no benefit to “native planting” as this is a city park. We have entire mountains right nearby. There is no shortage of native areas all around us. I also don’t know what a “nature-play opportunity” is, but I checked it because it includes the word nature.
Please include a small water body(small pond ). We used to really enjoy all the walks around the ponds in earlier years and miss the serenity and calmness it provided at the end of a busy day.
Water fountain using recycled water
Skateboarding or action sports area. Would be a natural fit to replace the large concrete "water" areas. cement or asphalt pump track
Bocce Ball courts both shaded & unshaded
Outdoor cooking demo
1) Expanded parking areas (current parking areas too small). 2) Upgraded & remodeled bathrooms. 3) Add new bathroom structure by Amphitheater.
Add badminton courts. Have a demonstration succulent garden.
Plant sculpture
Do something for the youth! Add a world-class BMX park and skateboard park. These are a MUST have! grass dog running area with fencing
more for the teenage kids like a bike and skateboard park like the awesome one San Jose has at Lake Cunningham:
https://www.sanjoseca.gov/Home/Components/FacilityDirectory/FacilityDirectory/2251/2028 Table C-26: Round 1 Survey Question 10 Results (cont.)
-
C-56 Memorial Park Specific Plan
Round 1 Survey Question 10: Which natural site and park features would you most like to see included at Memorial Park? Please select your top five choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
Bike/skateboard park like Lake Cunningham
Would love to see a bike park (BMX, mountain bikes) in Memorial Park. Something like Lake Cunningham or Truckee bike park!
Mountain bike/Bmx park
a place for kids to ride bikes and skateboards
Bicycle pump track please
Bike track/pump track
Bike park
I suggest a fun, healthy place for kids on wheels (skate, BMX, scooter, bike etc).
A bike park would be a great addition to the park and the surrounding community.
Bike park
Bike park
Bicycle pump track, skateboard opportunities
more designated pickle ball courts, please.
more boulders, logs, and other obstacles to ride on
Do more about the goose issue
More boulders and logs to ride on.
1. Placing Two Basketball Nets: Best may be where there is a softball area is. Kids can play basketball there. 2. Some wheelchair friendly paths. 3. Some varieties of eye-pleasing trees and bushes. 4. Educational: rainwater harvesting system experimental site for kids to see and enjoy. A building structure where kids and the building can be one.
Dedicated pickleball courts like those in Sunnyvale
Community garden
refill the water pond
A Rainwater Harvesting station for play Some bike lanes specifically designed for small children so that they can practice riding bike with adults: In other words, a safe flat ground for children and adults to use for recreation.
Small water fountain using recirculating water
More tennis courts.
Greenfields outdoor equipment, Please!
Fishing pond
Water features, fountains, playground, sensory (musical/water) playgrounds Community garden
Table C-27: Round 1 Survey Question 10 Results (cont.)
-
Appendix C Community Engagement Data C-57
Round 1 Survey Question 10: Which natural site and park features would you most like to see included at Memorial Park? Please select your top five choices or write in your ideal feature(s) in ‘Other.’
Write-in Responses for ‘Other’ [continued]
Water ponds and ducks
Water slides and theme park like Disneyland.
Outdoor movie space!
Please, no off-leash dogs. They're everywhere already.
More trees and native plantings would pair well with the Bicycle Garden, especially if the trees provide shade along the mini street
No pickle ball striping on the tennis courts! There are already shortages of tennis courts in Cupertino. If the city wants pickle ball courts, build them here separately. Don't takeaway tennis courts.And, enforce the use of courts that are being used by non-city private lessons. Fines should be $500 minimum as a deterrence. I cannot tell you how many times courts around the city are being used illegally for teaching private lessons.
Futsal courts (they can be multi purpose)
I know it’s drought all the time now but a small waterfall in a shady area would be nice for meditation and relaxing.
This would not use too much water
Less grass for water conservation and less maintenance. Add drought resistant cactus and/or succulents; botanical garden. Grow milkweed for monarch butterflies.
Rose Garden
Japanese garden theme without the water part (more pagodas, Japanese style bridge, etc.) to pay tribute to the strong sister city connection with Toyokawa.
Maybe a rose garden planted around gazebo near the amphitheater. There used to be beautiful roses planted around that which brought a nice natural color to the gazebo.
Playground
Pond
Exercise equipments.
dedicated pickle ball courts, more trees and shade
Natural focal points, like water feature or garden that become unique focal points to identify park Rose garden.
Keep it open. Don’t put buildings here. We need space, peaceful natural areas not manmade, concrete structures! We don’t need more sports fields because the parking sucks as it is! You can’t support anymore sports. Keep it open for all Bicycle/traffic garden
Recreate lake | water feature. Use recycled water.
cherry blossom tree
Table C-28: Round 1 Survey Question 10 Results (cont.)
-
C-58 Memorial Park Specific Plan
Figure C-31: Round 1 Survey Question 10 Results
-
QlO. Which natural site and park features would you most like to see included at Memorial Park?
Please selec t your top five c hoices or write in your ideal feoture( s) in 'Other'.
Upgraded or new picnic area(s)
New nature -play opportunities
More multi-use paths
Add pickleball striping to all the tennis courts
Upgraded softball field
Multi-use sports fields
Expanded or upgraded native planting areas
More open space or nature areas
More shade by increasing the number of trees
More shade through built structures
Off-leash dog park
Outdoor fitness stations
Sustainable design features and educational opportunities Native plants and/or demonstration garden
Other (please specify)
0 100 300 400
■ English ■ Mandarin
500 600
Appendix C Community Engagement Data C-59
Round 1 Survey Question 11: Please select your age group.
Answer Options English Mandarin All Responses
Under 10 years old 3 1 4
11 to 18 years old 21 2 23
19 to 24 years old 16 7 23
25 to 34 years old 83 6 89
35 to 44 years old 151 1 152
45 to 54 years old 191 3 194
55 to 64 years old 172 1 173
65 to 74 years old 142 0 142
More than 75 years old 61 0 61
Total 840 21 861
Table C-29: Round 1 Survey Question 11 Results
Figure C-32: Round 1 Survey Question 11 Results
-
Q 11. Please select your age group:
Under 10 years old I
11 to 18 years old
19 to 24 years old
25 to 34 years old
35 to 44 years old
45 to 54 years old
55 to 64 years old
65 to 74 years old
More than 75 years old
0 50 100 150 200 250
■ English ■ Mandarin
C-60 Memorial Park Specific Plan
Round 1 Survey Question 12: Please select your household composition.
Answer Options English Mandarin All Responses
Single 82 1 83
Couple 254 6 260
Unrelated household 4 9 13
Family with youth under 18 years old 273 4 277
Multi-generational family with youth under 18 years old 55 1 56 Family or multi-generational family (all over 18 years old) 157 0 157 Prefer not to say 26 0 26
Other (please specify) 1 0 1
Total 852 21 873
Table C-30: Round 1 Survey Question 12 Results
Figure C-33: Round 1 Survey Question 12 Results
-
Ql 2. Please select your household composition:
Single
Couple
Unrelated household
Family with youth under 18 years old
Multi-generational family with youth under 18 years old - Family or multi-generational family (all over 18 years old) Prefer not to say 1111
Other (please specify)
0 so 100 150 200 250 300
■ English ■ Mandarin
Appendix C Community Engagement Data C-61
Round 1 Survey Question 13: Which of the following applies to you? Select all that apply.
Answer Options English Mandarin All Responses
I live in Cupertino 754 19 773
I work in Cupertino 183 2 185
I attend school in Cupertino 89 3 92
I use Cupertino parks 549 7 556
I visit shops, restaurants, and service businesses in Cupertino 546 8 554 None of the above 2 0 2
Total 2,123 39 2,162
Table C-31: Round 1 Survey Question 13 Results
Figure C-34: Round 1 Survey Question 13 Results
-
Ql 3. Which of the following applies to you?
Selec1 all tha1 apply .
I live in Cupertino
I work in Cupertino -
I attend school in Cupertino -
I use Cupertino parks
I visit shops, restaurants, and service businesses in Cupertino None of the Above
0 100 200 300 400 500 600 700 800
■ English ■ Mandarin
C-62 Memorial Park Specific Plan
Round 1 Survey Question 14: How far do you live from Memorial Park? Answer Options English Mandarin All Responses
Less than 1/2 mile 122 2 124
Less than 1 mile 188 7 195
Between 1 mile and 5 miles 496 12 508
More than 5 miles 49 0 49
Total 855 21 876
Table C-32: Round 1 Survey Question 14 Results
Figure C-35: Round 1 Survey Question 14 Results
-
Ql 4. How far do you live from Memorial Park?
Less than 1/2 mile
Less than 1 mile
Between 1 mile and 5 miles
More than 5 miles
0 100 200 300 400 500 600
■ English ■ Mandarin
Appendix C Community Engagement Data C-63
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
- Improved/cleaner restroom would be nice.
- Allow night time access
1) It is the GEM of Cupertino. Especially with Westport coming online in the next few years, we need to make Memorial Park a true destination for the community. 2) Also, for the revitalized dry pond project, it wasn't clear in the description what "turf" really meant - is that real grass or astroturf? I hope the former because astroturf would be too hard to maintain. Please clarify on your project website. 3) It would have been nice to have this survey feedback before you started your pond project so we could give input on what to do with those ponds. Is it too late? If not, please incorporate my feedback re off-leash dog area and pickle ball courts to the list of possibilities, and 4) thank you for the opportunity to give input! I wasn't sure we'd get the chance. I'm most grateful to be part of the Cupertino community.
1. Shade… a lot of trees for shade with picnic tables under them. This place is too hot
2. Get rid of the geese and ducks. Too much poop on hardscape and grass areas keeps us away.
A pump track for bikes would be cool
A skate park would be a great addition!
A small coffee & ice cream shop
A snack shack or a type of mobile food vehicle.
A water feature for kids would be lovely!
Access to more parking is an issue for festivals and events, especially for older adults. Need raised stage closer to audience for amphitheater performances.
Add more native plants
Adding Dogs Off Leash Area is the top most priority for my family.
Always liked the fountains and water features
An off leash dog park should be fenced off. There are people who let their untrained dogs off leash in unfenced areas.
Would love to see more features like the existing gazebo that can be utilized by small and medium groups.
Areas welcoming wildlife would be nice
As well designed as the too small Sports Center. Go look at Mountain View. Go look at Barcalona.
Be a shame to lose the tennis courts and every court be a pickle ball court for more children’s amenities. Should be a park for every age.
Best use of the space to include all age groups
Bicycle lessons held on Sat by senior center parking lot took side walk as bike parking and chattering area while class was going. As walker we had to swing to lawn area. Walkers should have right of way on side walk.
Bicycle pump track, skateboard opportunities
By name Memorial park should have memorials and American heroes and heritage that I can explain to my grandchildren
Can you please write this survey in german for the future. I’m feeling left out of community events due to language barrier that you only use for some folks.
Table C-33: Round 1 Survey Question 15 Results
-
C-64 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Can't wait until the fixes to the pond areas are completed. Don't see much activity in recent days.
Community garden
Connect it with nature trails like McClellan ranch
Consider even pop-up commerce, like a coffee shop or something to give people a small destination. More shade is something I think is hugely important and more localized gathering areas vs vast lawns. The huge lawns also seem too water hungry.
Could benefit from bicycle related infrastructure
Could we make a real venue to host bigger name entertainment Create a BMX park or something where kids can ride their bikes! dedicated pickle ball courts, more trees and shade
do more for the teenagers
Do not add pickle ball lines to more tennis courts. If tennis players were aware of this, you’ll have a contentious issue, like other cities. They can go to Sunnyvale Tennis center to play pickle ball.
Do not make changes that will make it harder for Cupertino residence to enjoy their park Do not put off-leash dog areas here. There are many seniors and kids who come here and dogs off leash, no matter what their owners think are not always under control. If you put an all-inclusive area in this park, many of these people are terrified of sudden movements, dogs approaching, etc. As it is, people violate the leash law EVERYDAY at Memorial Park near the baseball field. They meet and let their dogs loose. There’s a dog park further down Mary Avenue they can use.
Does the management think that just drawing some pickleball lines on tennis court will encourage people to play pickleball? I don’t see that happening
Dog park
Dog park would be nice
Don’t put in fake turf please
Don't do away with all the fountains, a park should have some water features.
Don't try to do too much or be everything for everyone. Keep it a lovely and natural setting for people to use informally.
It is very de-stressing, and I want to keep it that way.
Enable to reserve to host extend family functions like marriages, private community gatherings enjoy the wide pathways, performances at the amitheatre - ability to be in shade and to sit and rest and observe Fill the duck pond
Fix the amphitheater so the walking path does not go between the audience and the performers. It is so disruptive to have a constant flow of walkers when some group is performing. Provide a dance floor instead so when a band plays there people can get up and have a place to dance.
Fix the areas where the ponds were and update existing common facilities if possible at reasonable cost.
Table C-34: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-65
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Fountains that wouldn't attract ducks and geese
Get it done soon, please. Missing going there already. And if we get enough rain, please bring back the Fountain. Please, please.
Get rid of the ponds; in order to minimize geese congregation as well as their ensuing excrement! Getting rid of the ponds is a good idea. More shade is needed - our climate isn't going to get any cooler Grass is stupid
Has more flower trees, open space and walking path.
Hope to keep open space in memorial garden. Since there's no ponds any more, we can have more trees and shade there. Maybe satellite fitness equipment under trees. We don't want to see new big buildings in Memorial Park.
How about a jogging path around the perimeter with exercise stations. how are the bathrooms? I know creekside bathrooms had some work done...but to be honest they are still dirty and smelly
How much is the park reconstruction going to cost us? How soon can the work begin seems we have waited long enough.
I don’t understand why you were totally getting rid of the duck pens. I understand if they needed repair, but I’m very disappointed that they are being completely and totally removed. That duck Pond has been a source of pleasure for generations
I enjoy taking daily walks at Memorial Park and love that i see all walks of life enjoying the park. I hope that the construction where the water area is doesn't last too long - it's an eye sore and takes away the beauty of the park while on a walk.
I feel the picnic barbeque rental space is alienating people from the area. It's empty most of the time. The trees there are not giving shade to the picnic site users, so it is better to plant two or more trees that give shade to the area That rental space can just be a regular barbeque site for public with safe minimum shade of trees. Then, some groups of people would occupy the space every weekend.
I have always appreciated that it is well maintained.
I have lived in Cupertino for most of my life, and my greatest memories there include Girl Scouts, Shakespeare in the Park, Camps, the Playground, Meeting friends to socialize/walk, and holiday or festival gatherings. Maybe the one thing I never got to do there was play soccer, because there wasn't a field set up.
I hope you are planning to install the Greenfield’s Adult Fitness area! I thought I read that it would be included in one of the parks. It’s perfect near the Sr Center. Or if trees are planted, adjacent to Quinlan.
I’ve used the Equipment and it would be a great asset. I’ve been pushing it for years! I live right next to Memorial park.
We don't want any more buildings or facilities in memorial park. We've already had enough.
We only need more green spaces, walking paths and trees.
I would like a cement or asphalt pump track for bikes. The closest cement or asphalt pump tracks are in Santa Cruz, Watsonville and there is one opening soon in Marina. They are super fun and can be ridden on bikes, skateboard and scooters. They are very well used whenever I go to them there are kids and adults using them especially compared to the other facilities.
Table C-35: Round 1 Survey Question 15 Results (cont.)
-
C-66 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
I love it! More native trees and plants with more shade would be lovely. Keeping rock features part of the park would be great too. I am happy to discuss what this means. The trials community is strong, but we are very inclusive and Memorial Park is close to our hearts.
I love Memorial park. When I moved to Cupertino, this was the hub where my dog and I found our ‘tribe’. A dedicated dog park area would be super useful and fun!!
I love the Veterans Memorial, grass & water features.
I love to run along the trails
I miss the pond and geese.
I miss the water features and the geese!
I miss the water ponds and ducks
I missed the pond!
I really like the gazebo feature of the park. The children always seem to like to climb the backside of the "hill" during events. Maybe there should be an actual trail up it? Or something else that would make this area more accessible and available for exploration?
I really liked the pond from before, though I know the goose situation was out of control. Is it possible to have a smaller, more manageable pond or water feature? Maybe like the Glenbrook Apts (next door to Memorial Park) has.
I suggest a fun, healthy place for kids on wheels (skate, BMX, scooter, bike etc).
I think all water features need to be thought of with constant drought cycles. If water is sparse and something is unused for weeks, months or years, will it still be useable/useful. Will it also attract geese and have a fecal issue.
I think due to the drought that we can get rid of the water features and use that space for trees and drought resistant plants. Green space like this is also important for wildlife, including squirrels and birds, so we should create a space that works for them as well. I love that we have an outdoor theater there. I think we can have less community festivals.
I love the tree lighting in December. My dog and I love this park and visit all the time and it always has a feeling of community with so many different people using it for various reasons. This is a special place, thanks for upgrading it.
I think the park’s upgrade should serve more to link/support the community services around it. I find the commercialization of the memorial area ugly (all the mismatched donor recognition), and wonder if there is a way to imcrease natural features around and within it to make it a more reflective and private piece of the park.
I wish it had more hills for mountain and landscape views.
I wish the Park/Community Center included it a track for walking/running with exercise stations, like the space at Campbell Community Center. The tracks at nearby schools and DeAnza College aren't really open to the public (due to school activities) or require parking fees.
I wish the pond was still there.
I wish you weren't eliminating the ponds .... I bet, however, that the ducks were kind of a problem, but I/we loved watching them move around the water.
Table C-36: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-67
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
I would like it to become a place where people come to enjoy nature and a place to relax, not a more urban setting I would like to keep it a Cupertino park and not have amenities and many eventsthat attract people from all over I would limit water play/structures - they never seem to work/hold up. Thinking about the water structure removed near the Community Center many years ago because it was too expensive to repair (and expensive to remove).
I would love to see at least 3 full court basketball courts with seating surrounding it. The courts at Campbell park are a great example.
I would suggest adding 4 rows of trees on the South and the East side. These would be shade for picnic areas and shade for events that are in the park. Similar to the trees in the park to the south of the library.
These should be watered with non-potable water. Do not use fake grass." I’d like to see the ponds rebuilt and properly maintained, as a reasonable city expense. Years went by without this.
People I know are greatly in favor of this. When I mentioned the ponds being removed, they were very angry. I do not see drought as an issue in this. Perhaps some people are more concerned with symbolism than reality. I’m also quite familiar with other parks, such as Shoreline Park, that have had concerns about geese etc. I still enjoy Shoreline.
Sometimes those directly involved in a project or space see the challenges they confront as more significant because they are particular to that space. However, no matter the choice, there will always be something problematic. For example, a park with an excess of events sees an excess of trash and bugs and related upkeep needs. It’s unrealistic to expect a problem-free park.
I’d love to have a bike park in Memorial Park!
If possible, do not add any water features that will increase the goose/duck population. It is nice to be able to walk through the park, and across the grass, without having to take off my shoes or worry about large amounts of poop from them.
If the plan can explicitly consider how to avoid geese (and their poo) accumulating in the park, that would be great! If we continue to be able to use De Anza college parking, we do not need too much additional parking. Some re stripping and a few more would be good. All inclusive bath rooms and ones at both ends of the park would be nice (near amphitheater and courts )
Improve the public bathrooms.
In #8 I wish you hadn't made community space a different choice from natural space. They are not mutually exclusive.
Please don't give the public the wrong idea.
increase ways for children to use the park plus dog owners It has been so disappointing to see the empty ponds due to the goose invasion. The parking situation is a problem with so many spaces reserved for the Senior Center.
it is a great place to get family and friends together. We have lived in Cupertino for over 25 years and have attended many enjoyable events at Memorial Park.
It is a lovely park, but the best feature is the amphitheater, and I love to attend the annual Shakespeare in the Park performances
It is a very nice park
It is sad to see it dry. Memorial Park must be kept tidy and green.
Table C-37: Round 1 Survey Question 15 Results (cont.)
-
C-68 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
It needs the playground experience of Three Oaks Park.
It was our go to park when our kids were small. We utilized its playground a lot. Nowadays we don’t go there other than for some event.
It was the beauty and serenity of the water ponds along with the Japanese walkways and the memorial sculptures that set this park apart . It would be a shame to loose all of its character and make it just a regular park without incorporating these features.
It will be nice to have a water feature because we can’t have it at home.
It would be great to have group of outdoor chest board tables perhaps near senior center. Love all the summer events at the amphitheater. Please upgrade it and add nearby bathrooms it would be lovely to have gated areas for small children to play safely and keep them away from Stevens Creek where cars drive super fast
It’s a great place to walk for pokemon go
It’s great! And keep the Farmers Market. Maybe add a night for food trucks.
It's a beautiful park, in a great location, and has served the community well for many years. Its appeal has declined when the ponds were drained and left as bare concrete. Please don't take too long to decide and upgrade the park (anything is better than closing it off and unused) - Cupertino needs it.
It's a beautiful place
It's a great park. I love the space!
Keep it GREEN
Less grass where the ponds were (saves on water and less maintenance). More drought tolerant plants ie. cactus and succulents, wild flowers, milkweed for monarch butterflies.
Less lawn.
Less parking = fewer cars. Native trees and plants support native birds and insects.
Let's put those dry lakes to good use!
Limited restroom facilities. I miss the water features but understand the reasoning for eliminating them.
Los Altos recently unveiled their brand new community center which is amazing. You should use it as a baseline when considering what to do with Memorial Park.
Lots of good memories as the kids were growing up. Water from the ponds will be missed. Hope you can replace with other water structure of some sort.
Lots of great memories when the kids were smaller. Ducks were endlessly entertaining back in they day although they made a mess, and the unique playgrounds also were a big draw even though they were older.
Love events like Farmer’s market and pancake breakfast.
Love the Cherry Blossoms. Please keep them!!!!! Thank you! Love the community functions there..pls don't close it
Table C-38: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-69
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Love the shaded tree area pathway.
Love the softball field! Keep it going!!
Many memories of Memorial, but the parking stops me now, not as agile as the good old days Memorial Day and Veteran day
Memorial park has almost everything except the safe all-inclusive playground. The current 2 unsafe playgrounds should be torn down and build in the safe all-inclusive Play-Park. Create various zones in the Play-Park: toddlers zone, swing/spin zone, slide zone, sound zone, art zone, and nature zone for all ability, all ages of children, adults, and all aging populations.
The flower garden can be built at nature zone. Basket ball court can be also built. Senior active and gathering area can be built near senior center.
City Park & Recreation can offer enrichment activities and socialization classes for all children in the Play-park and the summer camp for children with special needs too. Park & Recreation can provide many fun events for children. " Memorial park is a Cupertino major park and it is unfortunate that it has looked so dry with the empty pond, whereas all other city parks are beautifully maintained. We hope it will look beautiful and we can take pride in our park.
Memorial Park is my favorite park, I love the large grass field it’s perfect for playing sports! Memorial Park is pretty. Please add more greenery.
Memorial Park would be more pleasant by emphasizing nature and quietude rather than festivals. It could be filled with plants, trees and hills for people to enjoy walking, picnicking, having shady areas to relax and read or visit with friends - a serene place to escape from our busy, noise filled lives Modernize the park to keep cupertino at par with new cities More and better restrooms would help the overall expeience. more BBQ areas
More community activities to attract people. Summer bands. more designated pickle ball courts, please.
MORE grass, MORE trees please. Unadulterated open space with trees and grass is increasingly scarce in today's world. In our playtime activities, we can do with open space.
More lights and security cameras all around for safety of citizens More outdoot live music events
More shade and parking please. Maybe some street parking? More shade might be necessary to play with a toddler.
New BBQ spots with shade would be fantastic.
I want to enjoy cherry blossoms in Memorial Park.
More shade more trees and a new playground.
More trees for shade. More hydration stations or upgrade the water fountains to hydrations stations.
More trees!
Table C-39: Round 1 Survey Question 15 Results (cont.)
-
C-70 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
more water features please
My kids love going to Memorial Park for skateboarding. It would be awesome if the park could get an area with a smooth concrete surface for skateboarding.
Need more natural areas to enjoy nature and a quite place to relax in Need to ensure public safety at the park. Add Measures and enforcement to prevent homeless persons gathering at the park.
Nice parks in Cupertino, but Sunnyvale parks are much nicer. I go there to walk mostly, e.g., Serra Park, Las Palmas Park, Elizabeth Park to name a few.
No new structures.
Not cool that we cannot park in neighborhoods. Why is there permit parking at our most used park Not sure if Cupertino has any specific dog leash rules, but no city official seem to care that at most Cupertino open areas/trails many people leave dogs without leash. That leaves other people in danger, and the dog owners don't care as there is no one to ask them. At least can City place notices (on trails, open spaces, parks) saying dogs have to be on leash?
Not sure why I don't see an option to build an upgraded play structure area. There are so many children in Cupertino.
Special events happen now and then, but families want to come daily to enjoy a good playground. Consider the Magical Bridge Park of Palo Alto and others like it...
Off-leash dogs scare children and leave droppings. We can no longer bring children to baseball field area as there are off-leash dogs. There needs to be clearer direction for them to go to the Mary Ave park.
Park layout can be improved for festivals and gatherings. Suggest completely removing water feature and increase walkways, shade trees. Like Cuesta park in Mountain View.
Parks should facilitate transit. A large open space is useless if it doesnt allow walkers/bikers to use it to get to places.
People really like Memorial Park and will like it more when this project is completed.
People should absolutely not use off-leash dogs. We are allergic to dogs and have been attacked even though owners think their dogs "are cute". They should take them to the dog-park just across the street. It's illegal but no one bothers about it.
Plan for hotter weather with lots of shade...especially at amphitheater and children's play area.
Plant more trees for more shade
Plant more trees for shade. Water the trees we have to keep them growing. Some of the trees look like they need more water.
Playground area is very important for the kids. My kids played there a lot growing up and loved it. I wish the same for future generations.
Please add a Off-leash Dog park
please add an electronic wait timer for tennis courts. people take longer than their alloted time and there are a lots of fights/arguments
Please add dedicated pickleball courts!
Table C-40: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-71
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Please add pickleball courts
Please add Pickleball courts
Please add soccer fields and may be a small water feature for kids to get wet.
Please bring back the pond
Please build Pickleball courts in the pond area
Please consider adding a small community garden- we need more sustainable gardens that are accessible to all generations
Please design abundant shade trees and structures to cover seating areas, playgrounds. With climate change, we need more shade for outdoor activities. If we could have sustainable water features, that would be great. If no such solution, then saving water is priority.
Please do not add pickleball lines to the tennis courts.
Thank you for removing the ponds!
Please do not remake the mini-lakes that attract geese which poop everywhere.
MORE TREES PLEASE!!! :-)
Washington Serra Park in Sunnyvale is a good model.
Please do not spoil the tennis courts. Pickle all does not belong on a tennis court! Please do not stripe all the tennis courts for pickelball. The lines make it hard to play tennis and folks try to get away from that court (2). Also, please fix the timer devices. I have called about this in the past. Some folks stay longer than the allowed times since it isn't recorded. Also, others get aggressive and keep asking. With the timers, at least they can go and see for themselves when folks are expected to leave.
Please don’t add pickleball lines unless you also add more courts or a reservation system. These tennis courts are some of the busiest courts in the area. There is almost always a wait, and if the courts are also open to pickleball then it will be way too busy and too difficult to play, which will be a bad experience for everyone.
Please don't gunk it up with more stuff. Keep it relaxing and natural. I hate the war memorial area, it's badly designed, ugly, and a large space that doesn't get used because it's "sacred." It's not soothing or contemplative, if that was the goal.
UGLY.
Please don't make more water features. The drought will likely be ongoing.
Please don't make this park a concrete place. I understand why you took out the water, trying to reduce water waste. It was beautiful. Possibly create a pond not as large with upgraded filtration and recycling systems.
Whatever you decide please make it as natural as possible.
Please either use the current ponds as they were originally conceived, or replace them with something else entirely (they're an eye sore when they're drained)
Please ensure there will be adequate parking spaces for recreational visits. I stopped taking my young children there many, many years ago when the city began zoning away more and more parking spaces for special groups/purposes, causing us unable to park--a very upsetting and stressful experience.
Table C-41: Round 1 Survey Question 15 Results (cont.)
-
C-72 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Please finish the renovation work on the original pond area asap Please keep it green and open.
Please keep playground structures and add more shade and seated areas.
Please keep the softball field. It has been a great to have for the senior and adult softball leagues. please keep the walking paths
Please leave SOME water features. I know it’s a drought but it makes the park seem more alive.
Please limit use of chemicals such as round up. Try to have an organic park Please provide a pool as there is no olympic size pool for residents. All other recreation options are available; a year round pool is mot and is needed. There are many people wanting lap swimming please put more light with moving sensor shine to darker tree area, blind corner and rest room back of the Tennis and softball park. This increase public safety. Plan natural act as fence run along the big De Anza blvd, giving more private (now most people dislike to use the grass land next to De Anza blvd, just because more dust, noise, currently more like big wasted side walk grassy area
Please refill the water pond. It is one of the best features among all the parks in Cupertino.
The water used can be recycled to minimize any waste."
Please use only native plants that offer high habitat value in the landscaping choices regardless of what recreational or structural improvements/changes are made to the park. The park does not have to be a "open space" or a "nature area" to provide value in supporting biodiversity and allowing people to connect to nature; the park can have both spaces for humans and habitat for wildlife. Ensure the park is friendly to wildlife (e.g., bird-safe design, minimize artificial light at night). Here is a list of native plants and their ecosystem value from researcher Doug Tallamy: https://www. bringingbackthenatives.net/wp-content/uploads/2020/04/Native-Bay-Area-Plants-Showing-the-Number-of-Butterflies- and-Moths-That-Will-Lay-Eggs-on-them.xlsx.pdf
Please water the trees in the park. Some of the older ones look like they are not getting enough water. Please have more shade placed in but with trees instead of just covers.
Recycled water fountain
Refurbish or update existing playgrounds.
Remove water features. They are wasteful of water and available space. reserve more green and open space
Restore water ponds but in more natural settings.
Retain Sunday Farmers Market at Memorial Park
Safe Outdoor fitness equipment for adults/seniors
So glad the empty pond beds are being removed to allow for that area to be better utilized. socializing, dog walking, and location
Spend money wisely. We still like to have the current grass area near the quinlan center. The park facility is old and an upgrade would be sufficient.
Table C-42: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-73
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Some type of water amenity is a must such as a circle fountain.
We used to have big pond. It was too large and couldn't sustain water. Then, we could create a small pond with a fountain that can sustain.
I also have an idea for an artificial creek. Please see the video attached. https://youtu.be/_pGj0qJaDLg
Stop wasting water by soaking the grass so much that it gets squishy.
Tennis at Memorial Park is amazing! Don't cannibalize it all for pickleball please. If anything, build more tennis and more pickleball!
Terrain & rails for all abilities and ages
Thank you for asking for our input.
Thank you so much for doing this work! We're very much looking forward to the completion of the pond removal and hope to see Memorial Park continue to be a sprawling natural space to be enjoyed by everyone.
The amphitheater seating area is not comfortable. The ground is slanted and not even so it's hard to have picnic because food and drinks rolls off the ground. Build flat seating around amphitheater.
The amphitheater, while nice while it's being used for performances is sad and a poor use of space when not in use.
Perhaps it can be upgraded to be a multipurpose structure? The concerts, movies and other activities in the amphitheatre are very popular, but the majority of us attending like to bring our own chairs and picnic blankets, so better tiering of the back area would be great.
The current pickleball court trial is not enough to allow pickleball activities to thrive in the City. Sunnyvale is doing a better job in that respect. It is unfortunate that Cupertino is behind. Seems that there is a lot of interests in pickleball once people pick up this sport that suits old and young, and most people can play without a lot of training. It is easier than ping pong.
the footprint could be smaller and the park needs to connect to De Anza College across the street in an obvious and easy way
The park is a beautiful community space that needs to continue to be a walkable natural park. Interesting new park features should stay smaller and not overtake what the park currently has to offer. Upgrading picnic areas, adding more shade, and more useable gathering spaces with activities such as: gaming tables, quiet seating areas, and inclusive fitness and/or play space would enhance the park.
The park is a significant contributor to the city’s vitality and a feature well worth improving.
The park is currently being used by many Pokémon players of all ages.
The park is ok as-is. Please spend our taxes on something else, or lower our tax. Please don't allow off-leash dogs.
The park needs LOTS more shade and drought tolerant trees and plants and parking.
The park should be flowing with water features
The picnic area is good but needs shade
The play structures need to be updated. We rarely use that park for its play space because the playground is so dated and lacks shade.
Table C-43: Round 1 Survey Question 15 Results (cont.)
-
C-74 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
The pond was one of the things we enjoyed, watching nature.
The ponds were great, but that time has passed; shade will be needed to offer some of what the water provided. But most of all, this park needs a purpose to draw an audience, and the existing Veterans Memorial provides one (difficult- to-move) focal point.
The special big events in the park had loud speakers and the noise was continuously from day to night. Just like last week, it was the heat wave and we closed all the windows and turned on the AC and still hear the non-stop noise. We wanted to have a quiet weekend after a whole week of hard work, but we couldn’t. We ended up have to go away from home to get some quiet time. People were crossing the roads everywhere without using the cross walk. It was hard to get home because of the roadblock, i had to ask my family members to walk to wholefood and get picked up for a ride.
Dealing with this once a while is ok, but every week during the summer and almost every other week during the fall season is very hard for the residents nearby.
The tennis courts is somewhat old and should be upgraded with new nets and resurfacing.
The usage of the park will considerably increase when construction is completed across street.
The water feature at Memorial Park was its most relaxing, most distinguishing and attractive feature. The easy solution to broken pipes and cost of water was to take it out. Easy is not the way of a great City Council.
The worst part of the park was the goose feces. Could you add a dog park because so many Cupertino residents now have dogs. Not enough tennis courts.
There simply is not enough shade in the park. This was partly due to the extensive ponds but now that they are gone we need more trees or structures that provide shade. cupertino is pretty much on the warm side in the daytime for 9-10 months out of the year, and this necessitates more trees and shade structures.
There's already a lot of off-leash dogs in the park in the morning.
This is the best park in Cupertino and has sadly been neglected for the past few years of the drought and pandemic. It would be great to see the park revitalized and the pond construction completed. Thank you for your hard work to all the City employees on the job!!
This would be a great place to host 'off the grid' for food truck gathering This would be an ideal location for a regional bicycle garden that schools could come to use from throughout the region, because it is so close to Hwy 85.
Too few parks and open spaces in Cupertino -more green areas needed why does the city allow all new developments to remove mature trees and eliminate our existing canopy of existing shade? Be more like Palo Alto!"
Try to keep at least some of the ponds. Water features can still be environmentally friendly if they use grey or recycled water. We need to reduce the amount of grass too.
Upgrade the amphitheater but keep the audience set up as lawn and steps. Upgrade the restrooms to be larger and have more stalls, Upgrade the softball field to have cover in the dugouts. Add natural shade (trees) not necessarily man-made shade.
upgraded bathrooms and water refilling stations. Prefer a playground area for older elementary too (with wall ball court, climbing features, etc.) If there is an off leash dog park proposed, please fence it for the safety of other park users.
Table C-44: Round 1 Survey Question 15 Results (cont.)
-
Appendix C Community Engagement Data C-75
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Use lighting practices that are consistent with the Cupertino Dark Sky Ordinance. Specifically, lights should point downward and be fully shield, be turned off after 11:00 pm (or motion-sensor operated), have a color temperature of 2700 Kelvin or less (ordinance says 3000 K, but 2700 K is the new recommendation) Very useful and good representation of city needs
We do not have any dog parks for small dogs. I wish you guys would consider that.
We have a great chance to turn what is currently the big pond/concrete area into beautiful native landscaping, where everyone - kids, adults, seniors can all come to observe, enjoy, and learn about our native plants. It can also provide a big habitat for the wildlife.
We live in Christensen Dr. I wold prefer to have the dance and music on the onside of amphitheater and near Stevens creek side of the park. It gets extremely noisy with loud music these days because it’s close to the community center.
And the illegal parking on our street during the event is very disturbing We love to bring back Happy Kids Day Festival, Breakfast on July Fourth and Taiwanese cultural events. Please plant more taller trees. Please build multi-level parking structures on existing parking lots.
We miss the water and guest and ducks!
We need a off leash dog park
We need DOLA, please.
We need lighter basketball courts
We need more lap swim pools!
We need water spots for birds who are traveling long distance and need a place to rest. So, if the ponds are leaving Memorial Park, please place a pond somewhere else in Cupertino.
We should look into expanding the community center. Perhaps more outdoor classes in the park. For the green spaces, we can model after Cuesta park in Mountain View. For children playground, we can get some idea from the magical bridge in Palo Alto.
We'd love to see more trees and shade around the playground and picnic areas.
We've been visiting Memorial Park for over 20 years. I look forward to removal of the concrete ponds and seeing the revitalized space. I'd love to see the city take some design elements from the new Apple campus and make great use of drought-tolerant plantings (in addition to keeping a modest amount of green lawn for the kids to play on).
When I would walk a loop around the park in the summer, the area that gets the hottest is walking south adjacent to the parking lot. The sun is shining in your face since you’re headed south, and there’s no or only marginal amounts of shade.
When our children were younger, we used to go to the playgrounds weekly. Although we don't use them now, I think they are very valuable. Thinking through their childhood, we would have appreciated more shade, and more smaller reservable picnic areas for small get togethers/parties. Cupertino parks system really doesn't have nearly as many as, say, Sunnyvale.
Why destroy the ponds?
With temperatures rising, shade from trees is becoming vital for health.
Table C-45: Round 1 Survey Question 15 Results (cont.)
-
C-76 Memorial Park Specific Plan
Round 1 Survey Question 15: Is there anything else you’d like us to know about Memorial Park? Write-in Responses
Without significate water features to replace the lake, I probably will not visit Memorial Park ever again. The lake and islands are what gave the park it's unique charm. Without them, it's just another park. It was dumb of the city to drain the lake to "save water" and even dumber to tear it out because the drought is considered "endless" drought" ... you could have just shrank the lake and made it more useful like for energy capture, groundwater replenishment, etc. Very poor choices will lead to under-utilization and ultimately wasted money. Far more money than all that water would have cost.
Wonderful park. Needs more flowering Cherry trees. And pickle ball courts exclusive of the tennis courts.
Would be a perfect opportunity to make a new huge playground for both local families and families from further away Would like to emphasize more big trees and a water play area would like to see updated and improved playgrounds for toddlers thru grade school Would love to see a bike park (BMX, mountain bikes) in Memorial Park. Something like Lake Cunningham or Truckee bike park!
Would love to see creative play areas for all age groups of kids Would love to see more bike and scooter-friendly drawn paths alongside the pedestrian walking routes. Expanded/ wider pedestrian walking route space would be great.
Table C-46: Round 1 Survey Question 15 Results (cont.)
-
This Page
Intentionally
Left Blank
C-78 Memorial Park Specific Plan
Round 1
Pop-up Photos
September 17 & 24, October 8, 2022
Image C-25: Round 1 Pop-Up: Library & Bobateeno Image C-26: Round 1 Pop-Up: Library & Bobateeno Image C-27: Round 1 Pop-Up: Silicon
Valley Day N’ Night Fun Fest
Image C-28: Round 1 Pop-Up: Silicon
Valley Day N’ Night Fun Fest
Image C-29: Round 1 Pop-Up: Diwali Festival Image C-30: Round 1 Pop-Up: Diwali Festival -
Appendix C Community Engagement Data C-79
Round 1 Pop-up: Overview of Responses per Board
Boards 9/17/22 9/24/22 10/8/22 All Responses
Park Features Liked 514 914 1372 2800
Park Identity - Present 152 331 399 882
Park Identity - Future 166 292 409 867
Civic Event Space Features 430 865 861 2156
Community Gathering Space Features 434 768 880 2082
Natural Site and Park Features 475 874 1165 2514
Total 2171 4044 5086 11301
Table C-47: Round 1 Pop-up Results - Overview
Round 1
Pop-up Results
September 17 & 24, October 8, 2022
Figure C-36: Round 1 Pop-up Results - Overview
-
Round 1 Pop-Ups: Overview of Responses per Board
Park Features liked
Park Identity • Present
Park Identity - Future
Civic Event Space Features
Community Gathering Space Features
Natural Site and Park Features
0 500 1000 1500 2000 2500 3000
■ Sat 9/17 /22 ■ Sat 9/24/22 ■ Sat 10/8/22
.. ..
C-80 Memorial Park Specific Plan
Round 1 Pop-up: What features do you like most at Memorial Park? Answer Options 9/17/22 9/24/22 10/8/22 All Responses
Playgrounds 77 174 161 412
Softball Field 16 13 30 59
Tennis and Dual-Striped Pickleball Courts 46 7 109 162
Lawn Space for Informal Use 29 41 83 153
Natural Area and Trees 40 110 141 291
Walking Paths 38 100 157 295
Picnic and BBQ Areas 46 101 106 253
Benches for Seating 21 46 78 145
Amphitheater 42 48 102 192
Festivals and Events 86 148 207 441
Monuments and Memorials 25 42 57 124
Use of Recreation Facilities 48 76 109 233
Other - More trees 0 2 0 2
Other - Art room 0 1 0 1
Other - Water Park 0 5 0 5
Other - Shaded benches 0 0 5 5
Other - More parking 0 0 6 6
Other - Benches 0 0 2 2
Other - Water fountains 0 0 1 1
Other - Skate park 0 0 6 6
Other - Birds (Aviary) 0 0 1 1
Other - Weekly activities 0 0 1 1
Other - Playground upgrade 0 0 2 2
Other - Yoga studio 0 0 5 5
Other - Walking lanes, bike lanes, running lanes with
cut outs for simple exercise equipment 0 0 3 3
Total 514 914 1372 2800
Table C-48: Round 1 Pop-up Results - Most Liked Features -
Appendix C Community Engagement Data C-81
Figure C-37: Round 1 Pop-up Results - Most Liked Features Figure C-38: Round 1 Pop-up Results - Most Liked Features (write-in comments) What features do you like most at Memorial Park?
Playgrounds
Softball Field
Tennis and Dual-Striped Pickleball Courts
Lawn Space for Informal Use
Natural Area and Trees
Walking Paths
Picnic and BBQ Areas
Benches for Seating
Amphitheater
Festivals and Events
Monuments and Memorials
Use of Recreation Facilities
0 50 100 150 200 250 300 350
■ 5at9/17/22 ■ Sat9/24/22 ■ Satl0/8/22
What features do you like most at Memorial Park?
(write-in comments only)
Other• More trees
Other - Art room
Other - Water Park
Other - Shaded benches
Other - More parking
Other - Benches
Other - Water fountains
Other - Skate park
Other - Birds (Aviary)
Other - Weekly activities
Other - Playground upgrade
Other - Yoga studio
Other - Walking lanes, bike lanes, running lanes with cut outs for simple ... ___________ _ 0 ■ Sat 9/17/22 ■ Sat 9/24/22 Sat 10/8/22
-
400 450 500
4 6
C-82 Memorial Park Specific Plan
Round 1 Pop-up: Which of these scenarios best describes Memorial Park as it is currently? Answer Options 9/17/22 9/24/22 10/8/22 All Responses
Civic Events Space 57 94 131 282
Community Gathering Space 39 120 120 279
Natural Site and Park 56 117 148 321
Total 152 331 399 882
Table C-49: Round 1 Pop-up Results - Current Park Identity Figure C-39: Round 1 Pop-up Results - Current Park Identity -
Which of these scenarios best describes Memorial Park as it is currently?
Civic Events Space
Community Gathering Space
Natural Site and Park
0 so 100 150 200 250
■ Sat 9/17 /22 ■ Sat 9/24/22 Sat 10/8/22
300 350
Appendix C Community Engagement Data C-83
Round 1 Pop-up: Which of these scenarios best describes Memorial Park as you would like emphasized in the future?
Answer Options 9/17/22 9/24/22 10/8/22 All Responses
Civic Events Space 63 97 146 306
Community Gathering Space 43 86 112 241
Natural Site and Park 60 109 151 320
Total 166 292 409 867
Table C-50: Round 1 Pop-up Results - Future Park Identity
Figure C-40: Round 1 Pop-up Results - Future Park Identity Which of these scenarios best describes Memorial Park as you would like emphasized in the future?
Civic Events Space
Community Gathering Space
Natural Site and Park
0 50 100 150 200 250 300
■ Sat 9/17 /22 ■ Sat 9/24/22 Sat 10/8/22
-
350
C-84 Memorial Park Specific Plan
Round 1 Pop-up: Which Civic Event Space features would you most like to see at Memorial Park? Answer Options 9/17/22 9/24/22 10/8/22 All Responses
Upgraded Amphitheater 78 134 149 361
New Recreation Amenities 115 114 132 361
New Water Play Amenities 115 297 263 675
Expanded or Upgraded Areas for Large Outdoor
Events 47 101 133 281
More Large-Scale Community Events 75 156 174 405
Other 2 63 38 103
Other - Roller Rink 0 8 0 8
Other - Amphitheater lights, sound, seating 0 3 0 3
Other - Skateboard park 0 4 0 4
Other - Dog Park 0 15 0 15
Other - Bakery 0 14 0 14
Other - Parkour 0 19 0 19
Other - Rock climbing wall 0 0 9 9
Other - Pickleball tournaments 0 0 1 1
Total 430 865 861 2156
Table C-51: Round 1 Pop-up Results - Civic Event Space Features -
Appendix C Community Engagement Data C-85
Figure C-41: Round 1 Pop-up Results - Civic Event Space Features Figure C-42: Round 1 Pop-up Results - Civic Event Space Features (write-in comments) Which CIVIC EVENT SPACE features would you most like to see at Memorial Park?
Upgraded Amphitheater
New Recreation Amenities
New Water Play Amenities
Expanded or Upgraded Areas for Large Outdoor Events
More Large-Scale Community Events
0 100 200 300 400 500 600
■ Sat 9/17 /22 ■ Sat 9/24/22 ■ Sat 10/8/22
Which CIVIC EVENT SPACE features would you most like to see at Memorial Park?
Other - Roller Rink
Other - Amphitheater lights, sound, seating
Other - Skateboard park
Other - Dog Park
Other - Bakery
Other - Parkour
Other - Rock climbing wall
Other - Pickleball tournaments
0 (write-in comments only)
2 4 6 8 10
■ Sat 9/17 /22 ■ Sat 9/24/22 Sat 10/8/22
12 14 16
-
700 800
18 20
C-86 Memorial Park Specific Plan
Round 1 Pop-up: Which Natural Site and Park features would you most like to see at Memorial Park? Answer Options 9/17/22 9/24/22 10/8/22 All Responses
Upgraded or New Picnic Area(s) 18 49 74 141
New Nature-Play Opportunities 64 86 99 249
More Multi-Use Paths 28 46 61 135
Add Pickleball Striping to All Tennis Courts 35 36 67 138 Upgraded Softball Fields 16 22 33 71
Multi-Use Sports Fields 43 60 88 191
Native Plant Areas or Demonstration Garden 48 81 106 235 More Open Space or Nature Areas 26 49 82 157
Shade: Adding Trees 73 106 137 316
Shade: Shade Structures 25 90 82 197
Off-Leash Dog Park 34 79 112 225
Outdoor Fitness Stations 37 75 100 212
Sustainable Design and Education 28 58 85 171
Other 10 37 6 53
Other - All Areas: Pervious pavement, green
infrastructure, climate appropriate planting 0 3 0 3
Other - Tree house 0 7 0 7
Other - Trees 0 5 0 5
Other - More shade 0 2 0 2
Other - Petting zoo 0 1 0 1
Other - Pickleball courts 0 13 0 13
Other - Soccer field 0 6 0 6
Other - Fountains 0 0 2 2
Other - Basketball courts 0 0 1 1
Other - Bike trails 0 0 1 1
Other - Butterfly garden 0 0 1 1
Other - Sensory playground 0 0 1 1
Other - Synthetic running track 0 0 1 1
Other - Races 0 0 1 1
Other - Pool 0 0 1 1
Other - Musical playground 0 0 1 1
Other - Magical Bridges Park 0 0 1 1
Other - Outdoor skating rink 0 0 22 22
Other - Volleyball courts 0 0 5 5
Other - Nature art 0 0 1 1
Other - Dace 0 0 1 1
Total 475 874 1165 2514
Table C-52: Round 1 Pop-up Results - Natural Site and Park Features -
Appendix C Community Engagement Data C-87
Figure C-43: Round 1 Pop-up Results - Natural Site and Park Features Which NATURAL SITE AND PARK features would you most like to see at Memorial Park?
Sustainable Design and Education
Outdoor Fitness Stations
Off-Leash Dog Park
Shade: Shade Structures
Shade: Adding Trees
More Open Space or Nature Areas
Native Plant Areas or Demonstration Garden
Multi-Use Sports Fields
Upgraded Softball Fields
Add Pickleball Striping to All Tennis Courts
More Multi-Use Paths
New Nature-Play Opportunities
Upgraded or New Picnic Area(s)
0 50 100 150 200 250 300
■ Sat 9/17 /22 ■ Sat 9/24/22 ■ Sat 10/8/22
-
350
C-88 Memorial Park Specific Plan
Figure C-44: Round 1 Pop-up Results - Natural Site and Park Features (write-in comments) -
Which NATURAL SITE AND PARK features would you most like to see at Memorial Park?
(write-in comments only)
Other - All areas: Pervious pavement, green infrastructure, ...
Other - Tree house
Other - Trees
Other - More shade -
Other - Petting zoo •
Other - Pickleball courts
Other - Soccer field
Other - Fountains
Other - Basketball courts
Other - Bike trails
Other - Butterfly garden
Other - Sensory playground
Other - Synthetic running track
Other - Races
Other- Pool
Other - Musical playground
Other - Magical Bridges Park
Other - Outdoor skating rink
Other - Volleyball courts
Other - Nature art
0 5 10
■ Sat 9/17 /22 ■ Sat 9/24/22 ■ Sat 10/8/22
15 20 25
Appendix C Community Engagement Data C-89
Round 1 Pop-up: Which Community Gathering Space features would you most like to see at Memorial Park?
Answer Options 9/17/22 9/24/22 10/8/22 All Responses
New Universal or All-Inclusive Amenities 26 33 44 103
Expanded Gathering Areas by Senior Center 17 45 39 101
Expanded Gathering Areas by Community Center 42 56 69 167 Connect Park to Bike Trails and Bike Lanes 81 110 150 341 Improved Accessibility and Inclusiveness 59 81 83 223
More Activities and Amenities for All Ages/Abilities 63 117 118 298 More Parking 29 81 81 191
More Community-Based Monuments and Memorials 17 34 37 88 Public Art 48 72 100 220
Outdoor Classrooms 52 83 90 225
Other 6 56 5 67
Other - Electric vehicle charging 0 1 0 1
Other - Less hardscape 0 3 0 3
Other - BBQ 0 4 1 5
Other - Community Pokémon trading card room 0 3 0 3
Other - Kids bike riding area (safe from cars) 0 10 0 10 Other - Indoor gym (basketball, badminton,
volleyball, ping pong) 0 19 0 19
Other - More greenery and less grass 0 6 0 6
Other - Mobility hubs 0 10 0 10
Other - Spaces for block/community parties 0 0 1 1
Other - Snack Bar/More Food Trucks 0 0 15 15
Other - Shaved Ice 0 0 2 2
Other - Water features kids can play in 0 0 2 2
Other - Modern playground equipment 0 0 1 1
Other - Arts & crafts center 0 0 1 1
Other - Basketball 0 0 21 21
Other - Soccer 0 0 4 4
Other - Racing 0 0 2 2
Other - Obstacle course for older kids 0 0 13 13
Other - Four square court 0 0 5 5
Other - Going to parks 0 0 1 1
Total 434 768 880 2082
Table C-53: Round 1 Pop-up Results - Community Gathering Space Features -
C-90 Memorial Park Specific Plan
Figure C-45: Round 1 Pop-up Results - Community Gathering Space Features -
Which COMMUNITY GATHERING SPACE features would you most like to see at Memorial Park?
New Universal or All-Inclusive Amenities
Expanded Gathering Areas by Senior Center
Expanded Gathering Areas by Community Center
Connect Park to Bike Trails and Bike Lanes
Improved Accessibility and Inclusiveness
More Activities and Amenities for All Ages/ Abilities
More Parking
More Community -Based Monuments and Memorials
Public Art
Outdoor Classrooms
0 50 100 150 200 250 300 350
■ Sat 9/17 /22 ■ Sat 9/24/22 Sat 10/8/22
Appendix C Community Engagement Data C-91
Figure C-46: Round 1 Pop-up Results - Community Gathering Space Features (write-in comments) Which COMMUNITY GATHERING SPACE features would you most like to see at Memorial Park?
(write-in comments only)
Other• Going to parks
Other - Four square court
Other - Obstacle course for older kids
Other - Racing
Other - Soccer
Other - Basketball
Other - Arts & crafts center
Other• Modern playground equipment
Other - Water features kids can play in
Other - Shaved Ice
Other• Snack Bar/More Food Trucks
Other• Spaces for block/community parties
Other· Mobility hubs
Other • More greenery and less grass
Other• Indoor gym (basketball, badminton, volleyball, ping pong) Other• Kids bike riding area (safe from cars)
Other - Community Pokemon trading card room
Other· BBQ
Other • Less hardscape
Other - Electric vehicle charging •
-
0 5 10 15 20
■ Sat 9/17 /22 ■ Sat 9/24/22 Sat 10/8/22
C-92 Memorial Park Specific Plan
Round 1
Pop-up Boards
September 17 & 24, October 8, 2022
Figure C-47: September 17, 2022 Pop-up Results Figure C-48: September 17, 2022 Pop-up Results -
/••Ylldl1 •• -
Memorial Park
'1 11 "--'"Yl>Act
What features do you LIKE
O T at Memorial Park?
• •• •
a
CUPE.ltTINO
'1 {17/-i~
Which of fhese scenarios best
describes Memorial Park ...
AS IT IS CU EN L ? AS YOU w e ULD LIKE
EMPHASIZED If' HE
FU u Select one . Select one.
•
~ Projecl Webpoge • e
~ hltp,.://erigogecur;iert1no.ccm/mcrri~-ipec··,c"fl1Qrl •.Jt
-~ ••y 1.
. CUPEAT1NO
Appendix C Community Engagement Data C-93
Figure C-49: September 17, 2022 Pop-up Results Figure C-50: September 17, 2022 Pop-up Results Figure C-51: September 17, 2022 Pop-up Results Figure C-52: September 24, 2022 Pop-up Results SAT 9/24/22
" n t.i~':'1
Which IVIC EVEN'T SPACE
features would you most like
to see at Memorial Park?
ft~ Projecf Webpage
Ill http;Jlel1QCJl;l<!!CUpt:f11ro.corr/f'".a4o ()Otk. pecik-pkln CUPERT I NO 1/1"11..J,
W h ATURALSlfEA D
PARK features would you most
like to see at Memorial Park?
• • • •
~ Pro1ect Webpage e
~ httpt://oo,;iags,cuoertirJo.ccim/memon::11-pork-speci6c~ -
~ We want to hear from your To~ -r-, nnl re 1 'e-'/
~ l'tttp-s.!//enga,;@cupertfno ... c.om/memorial-pa,k-1pecffic•p~n CUl'l!flT IN O
C-94 Memorial Park Specific Plan
SAT 9/24/22
Figure C-55: September 24, 2022 Pop-up Results Figure C-56: September 24, 2022 Pop-up Results SAT 9/24/22
Figure C-53: September 24, 2022 Pop-up Results Figure C-54: September 24, 2022 Pop-up Results Sat 9/24/22
SAT 9/24/22
-
... AS IT IS
CU FN LY?
Select~
Which of these scenarios best
describes Memorial Park. ..
AS YOU WOULD LIKE
EMPHASIZED
l THE FUTURE?
Select one.:.
Which CO IMU IT' GATHERII' G
I\PACE features would you most
like to see at Memorial Park?
Which Cit/IC EVENTS ACE
features would you most like
to see at Memor ial Park?
Which TURAL ITC N
PARK features would you mos
like to see at Memo rfal Park?
''- ll
~;Ii'~
~ e 15}9._!.,II.,
, I!! We wanl to hear from youl a~.e the onl nc ,:;urvt:'yl II http>e//•ngagoeuporflno .com /memo,ial-pmk-,pecllk-pkm El tJo!,lo! l,,f,\ Ur-/ cu,m,No
Appendix C Community Engagement Data C-95
Figure C-57: October 8, 2022 Pop-up Results (Set 1) Figure C-58: October 8, 2022 Pop-up Results (Set 2) SAT 10/8 Set #1
Figure C-59: October 8, 2022 Pop-up Results (Set 1) Figure C-60: October 8, 2022 Pop-up Results (Set 2) SAT 10/8 Set #1
What features do you LIK.f
OST at Memorial Park?
••
~ We want lo hear hom yovl a -e, ~r r,p u
~ hltps.:l/fftf10geeul)ln'fino .com /memoriol -pm1t:-speell'tc•plen ... AS IT IS
Which of these scenarios best
describes Memorial Park ...
... AS YOU WOULD LIKE
EMPHASIZED
'HE UTU E?
~ We wonl lo heat from )'OU! t'( {')'l ,., IV
~ httpl://engogOC::llpefffncu::om/mernOf1al-park-1pKifl.e •Plan What features do you IK!
MOST at Memorial Park?
5 flT 110/ 8 Sc:t :z.
~~ We wan l lo hear /ram yaul ' c t· n e ,
~ h.ttps://e-ngagecvpedfno .com /memorial-p,oric•s:p@Cllc-pkln el
-
,, .. Which of these scenarios best
describes Memorial Perl<...
,Sfli" I Set#-2.
... AS IT IS
C E L ?
Select one of the three
options below.
... AS YOU WOULD LIKE
EMPHASIZED
C-96 Memorial Park Specific Plan
Figure C-61: October 8, 2022 Pop-up Results (Set 1) Figure C-62: October 8, 2022 Pop-up Results (Set 2) SAT 10/8 Set #1
Figure C-63: October 8, 2022 Pop-up Results (Set 1) Figure C-64: October 8, 2022 Pop-up Results (Set 2) SAT 10/8 Set #1
-
,14,;@flm
Which CIVIC EVE S,ACE
featu res would you most llke
to see at Memorial Park?
Olher 43 • •
~;-~~- .. . • ..... . • • •• • •••••• •• • ••••• • •
~ W.e-wonllohellrfroRLVmP. t?l--. b r, ~ 1 y ~
a ~ hNpsJ/ongogec.upatfino .co,n/memCJdai-porlc.,pe::llc -plon II
rev It a I I z e
CUPEIITIMO
Which , , GAlHEIING
SP CE features would you most
like to see at Memorial Park?
• We want to htW.r tram you I uk 1r, o 1 n - Jrvc
a
http, ://enoogecup«ino .eom/m1trnorlol •J)Olk-speclftc-plan CUflEIJIYINO
Which CIVIC EVl!NT AC
features would you most like
to see at Memorial Park?
Which C U GAfflEJttNG
P Cf features would you most
like to see at Memorial Park? ·,. . •
•• •
Appendix C Community Engagement Data C-97
Figure C-65: October 8, 2022 Pop-up Results (Set 1) Figure C-66: October 8, 2022 Pop-up Results (Set 2) SAT 10/8 Set #1
Which ATU"RAL 111: ND
P'A K features would you most
like to see at Memorial Park?
-
Which N LIIAL SITE A
P R features would you most
like to see at Memorial Park?
~ We wanl lo lnmrlrmn you1- .-, ,, e ,. "'='/
~ htfp&://engogecupertlno .corn/m•mot'JOl•pofk •spKific;:-pkrn C-98 Memorial Park Specific Plan
Round 1 Webinar Question 1: How did you hear about this webinar? Select all that apply.
Answer Options All Responses
Social media (Instagram, Facebook, Twitter) 3
Engage Cupertino website 1
City of Cupertino website 0
Email notification 3
From a friend or family member 0
Sign at the Park 0
Postcard in the mail 0
Door hanger sign 1
Flyer 0
Other 0
TOTAL 8
Table C-54: Round 1 Webinar Question 1 Results
Round 1
Webinar Question Results
September 15, 2022
Figure C-67: Round 1 Webinar Question 1 Results
-
Ql. How did you hear about this webinar?
Social media (lnstagram, Facebook, Twitter)
Engage Cupertino website
City of Cupertino website
Email notification
From a friend or family member
Sign at the Park
Postcard in the mail
Door hanger sign
Flyer
Other
Select all that apply.
________________________ _. 3
________ 1
1 0 0.5 1 1.5 2 2.5 3 3.5
Appendix C Community Engagement Data C-99
Round 1 Webinar Question 2: How far do you live from Memorial Park? Answer Options All Responses
Less than ½ mile 3
Less than 1 mile 2
Between 1 and 5 miles 5
More than 5 miles 0
TOTAL 10
Table C-55: Round 1 Webinar Question 2 Results
Figure C-68: Round 1 Webinar Question 2 Results
-
Q2. How far do you live from Memorial Park?
More than 5 miles o
0 1 2 3 4 5 6
C-100 Memorial Park Specific Plan
Round 1 Webinar Question 3: What activities do you engage in at Memorial Park? Select all that apply.
Answer Options All Responses
Exercising 5
Walking my dog 1
Playing a game or sport 2
Attending a class or program 3
Attending a special event 9
Experiencing nature 4
Having a picnic 4
Hanging out with family/friends 6
Playing at the playground 2
Visiting the Veterans Memorial or other special features 2 TOTAL 38
Table C-56: Round 1 Webinar Question 3 Results
Figure C-69: Round 1 Webinar Question 3 Results
-
Q3. What activities do you engage in at Memorial Park?
Select all that apply.
Exercising
Walking my dog -
Playing a game or sport
Attending a class or program
Attending a special event
Experiencing nature
Having a picnic
Hanging out with family/friends
Playing at the playground
Visiting the Veterans Memorial or other special features 0 1 2 3 4 5 6 7 8 9
Appendix C Community Engagement Data C-101
Round 1 Webinar Question 4: What special events have you attended at Memorial Park? Answer Options All Responses
Cherry Blossom Festival 9
Silicon Valley Day 'N Night Fun Fest (Fall Festival) 2
Bay Area Diwali 6
Shakespeare in the Park 6
Movies in the Park 3
Summer Concert Series 6
Tree Lighting or Breakfast with Santa 2
Veterans Memorial Day Celebration 5
Bhubaneswar Sister City Heritage India Festival 3
Other 4
TOTAL 46
Table C-57: Round 1 Webinar Question 4 Results
Figure C-70: Round 1 Webinar Question 4 Results
Q4. What special events have you attended at Memorial Park? Cherry Blossom Festival
Silicon Valley Day 'N Night Fun Fest (Fall Festival)
Bay Area Diwali
Shakespeare in the Park
Movies in the Park
Summer Concert Series
Tree Lighting or Breakfast with Santa
Veterans Memorial Day Celebration
Bhubaneswar Sister City Heritage India Festival
Other
0 1
2 2
2 3
3 3 4
6 6
6 5
4 5 6 7 8
-
9 9 10
C-102 Memorial Park Specific Plan
Round 1 Webinar Question 5: Which of these scenarios would you most closely identify with Memorial Park today? Select one.
Answer Options All Responses
Civic event space (e.g., festivals, concerts, sports) 4 Community gathering space (e.g., playgrounds, picnics, memorials, classes) 6 Natural site and park (e.g., green space, trees, walking paths, nature areas) 2 TOTAL 12
Table C-58: Round 1 Webinar Question 5 Results
Figure C-71: Round 1 Webinar Question 5 Results
-
Q5. Which of these scenarios would you most closely
identify with Memorial Park today? Select one.
Civic event space (e.g., festivals, concerts, sports)
Community gathering space {e.g., playgrounds, picnics,
memorials, classes)
Natural site and park (e.g., green space, trees, walking paths, nature areas)
0 1 2
4 2
3 4 5
6 6 7
Appendix C Community Engagement Data C-103
Round 1 Webinar Question 6: Which of these scenarios would you like emphasized in Memorial Park into the future? Select one.
Answer Options All Responses
Civic event space (e.g., festivals, concerts, sports) 3 Community gathering space (e.g., playgrounds, picnics, memorials, classes) 5 Natural site and park (e.g., green space, trees, walking paths, nature areas) 4 TOTAL 12
Table C-59: Round 1 Webinar Question 6 Results
Figure C-72: Round 1 Webinar Question 6 Results
-
Q6. Which of these scenarios would you like emphasized in Memorial Park into the future? Select one.
Civic event space (e.g., festivals, concerts, sports)
Community gathering space (e.g., playgrounds, picnics, memorials, classes)
Natural site and park (e.g., green space, trees, walking paths, nature areas)
0 1
3 4
2 3 4
5 5
C-104 Memorial Park Specific Plan
Round 2 Survey Question 1: Which features of Concept A do you like MOST? Select three.
Answer Options English Mandarin All Responses
Enhanced entry 77 4 81
Event lawn 77 4 81
Event plaza 56 3 59
Relocated/upgraded restroom 191 5 196
Upgraded amphitheater 200 8 208
Passive garden walk 216 8 224
Picnic area with shade 166 6 172
Group picnic area with shade 130 5 135
Relocated/expanded playground 241 14 255
Bike traffic garden 128 7 135
Fitness stations 139 4 143
Table games (e.g., ping pong, chess) 118 4 122
Bocce ball court 83 2 85
Dedicated pickleball courts 216 6 222
Dedicated tennis courts 96 8 104
Quinlan courtyard as event space 51 0 51
Expanded multi-use path network 62 2 64
Bike connections to City-wide network 99 0 99
Additional parking 90 4 94
Drop-off area 6 1 7
Additional trees 163 0 163
Additional cherry trees 85 5 90
Additional planting areas 41 2 43
Trees (existing) 63 1 64
Total 2794 103 2897
Table C-60: Round 2 Survey Question 1 Results
Round 2
Survey Results
Duration: January 25 - February 22, 2023
-
Appendix C Community Engagement Data C-105
Figure C-73: Round 2 Survey Question 1 Results
Ql. Which features of Concept A do you like MOST?
Enhanced entry
Event lawn
Event plaza
Relocated/upgraded restroom
Upgraded amphitheater
Passive garden walk
Picnic area with shade
Group picnic area with shade
Relocated/expanded playground
Bike traffic garden
Fitness stations
Table games (e.g., ping pong, chess)
Bocce ball court
Dedicated pickleball courts
Dedicated tennis courts
Quinlan courtyard as event space
Expanded multi-use path network
Bike connections to City-wide network
Additional parking
Drop-off area ■
Additional trees
Additional cherry trees
Additional planting areas
Trees (existing)
0 Select (3) three.
so 100 150 200
■ English ■ Mandarin
-
250
C-106 Memorial Park Specific Plan
Round 2 Survey Question 2: Which feature of Concept A do you like LEAST? Select one.
Answer Options English Mandarin All Responses
Enhanced entry 84 2 86
Event lawn 35 0 35
Event plaza 39 1 40
Relocated/upgraded restrooms 11 1 12
Upgraded amphitheater 49 3 52
Passive garden walk 28 0 28
Picnic area with shade 5 0 5
Group picnic area with shade 17 0 17
Relocated/expanded playground 64 2 66
Bike traffic garden 95 4 99
Fitness stations 91 2 93
Table games (e.g., ping pong, chess) 83 6 89
Bocce ball court 92 3 95
Dedicated pickleball courts 76 4 80
Dedicated tennis courts 40 3 43
Quinlan courtyard as event space 28 0 28
Expanded multi-use path network 4 0 4
Bike connections to City-wide network 15 1 16
Additional parking 57 0 57
Drop-off area 22 2 24
Additional trees 9 0 9
Additional cherry trees 14 0 14
Additional planting areas 12 0 12
Trees (existing) 5 2 7
Total 975 36 1011
Table C-61: Round 2 Survey Question 2 Results
-
Appendix C Community Engagement Data C-107
Figure C-74: Round 2 Survey Question 2 Results
Q2. Which feature of Concept A do you like LEAST?
Enhanced entry
Event lawn
Event plaza
Relocated/upgraded restrooms
Upgraded amphitheater
Passive garden walk
Picnic area with shade -
Group picnic area with shade
Relocated/expanded playground
Bike traffic garden
Fitness stations
Table games (e.g., ping pong, chess)
Bocce ball court
Dedicated pickleball courts
Dedicated tennis courts
Quinlan courtyard as event space
Expanded multi-use path network -
Bike connections to City-wide network
Additional parking
Drop-off area
Additional trees -
Additional cherry trees
Additional planting areas
Trees (existing)
0 Select ( 1 ) one.
20 40 60 80
■ English ■ Mandar in
-
100
C-108 Memorial Park Specific Plan
Round 2 Survey Question 3: Which features of Concept B do you like MOST? Select three.
Answer Options English Mandarin All Responses
Enhanced entry 67 5 72
Educational garden zone 255 9 264
Nature playground 359 17 376
Relocated/upgraded restrooms 170 5 175
Upgraded amphitheater 191 7 198
Event plaza 43 4 47
Event lawn 59 3 62
Passive garden walk 280 7 287
Softball field (existing) 134 3 137
Group picnic area with shade 118 2 120
Picnic area with shade 165 4 169
Dedicated tennis courts 85 3 88
Dedicated pickleball courts 209 7 216
Quinlan courtyard with seating 52 4 56
Expanded multi-use path network 58 2 60
Bike connections to City-wide network 102 3 105
Additional parking 73 8 81
Drop-off area 11 0 11
Additional trees 149 8 157
Additional cherry trees 87 3 90
Additional planting areas 39 2 41
Trees (existing) 44 2 46
Total 2750 100 2850
Table C-62: Round 2 Survey Question 3 Results
-
Appendix C Community Engagement Data C-109
Figure C-75: Round 2 Survey Question 3 Results
Q3. Which features of Concept B do you like MOST?
Enhanced entry
Educational garden zone
Nature playground
Relocated/upgraded restrooms
Upgraded amphitheater
Event plaza
Event lawn
Passive garden walk
Softball field (existing)
Group picnic area with shade
Picnic area with shade
Dedicated tennis courts
Dedicated pickleball courts
Quinlan courtyard with seating
Expanded multi-use path network
Bike connections to City-wide network
Additional parking
Drop-off area •
Additional trees
Additional cherry trees
Additional planting areas
Trees (existing)
0 so
Select (3) three.
100 150 200 250
■ English ■ Mandarin
-
300 350 400
C-110 Memorial Park Specific Plan
Round 2 Survey Question 4: Which feature of Concept B do you like LEAST? Select one.
Answer Options English Mandarin All Responses
Enhanced entry 79 4 83
Educational garden zone 95 5 100
Nature playground 26 0 26
Relocated/upgraded restrooms 5 0 5
Upgraded amphitheater 51 2 53
Event plaza 44 1 45
Event lawn 27 1 28
Passive garden walk 28 0 28
Softball field (existing) 223 9 232
Group picnic area with shade 4 0 4
Picnic area with shade 4 0 4
Dedicated tennis courts 60 1 61
Dedicated pickleball courts 112 7 119
Quinlan courtyard with seating 22 1 23
Expanded multi-use path network 9 0 9
Bike connections to City-wide network 36 2 38
Additional parking 69 0 69
Drop-off area 24 3 27
Additional trees 11 0 11
Additional cherry trees 16 0 16
Additional planting areas 24 0 24
Trees (existing) 6 0 6
Total 975 36 1011
Table C-63: Round 2 Survey Question 4 Results
-
Appendix C Community Engagement Data C-111
Figure C-76: Round 2 Survey Question 4 Results
Q4. Which feature of Concept B do you like LEAST?
Enhanced entry
Educational garden zone
Nature playground
Relocated/upgraded restrooms ■
Upgraded amphitheater
Event plaza
Event lawn
Passive garden walk
Softball field (existing)
Group picnic area with shade ■
Picnic area with shade ■
Dedicated tennis courts
Dedicated pickleball courts
Quinlan courtyard with seating
Expanded multi-use path network •
Bike connections to City-wide network
Additional parking
Drop-off area
Additional trees -
Additional cherry trees -
Additional planting areas
Trees (existing) ■
0 Select (1) one.
50 100 150
■ English ■ Mandarin
-
200 250
C-112 Memorial Park Specific Plan
Round 2 Survey Question 5: Which features of Concept C do you like MOST? Select three.
Answer Options English Mandarin All Responses
Enhanced entry 56 4 60
Senior Center deck as component of entry plaza 121 3 124 Event lawn 132 2 134
Picnic area with shade 193 5 198
Relocated/upgraded restrooms 192 8 200
Interactive cultural exhibit area 133 6 139
Event plaza 66 2 68
Passive garden walk 246 9 255
Group picnic area with shade 122 4 126
Upgraded playground 268 18 286
Relocated/expanded amphitheater 224 6 230
Dual-use tennis and pickleball courts 222 6 228
Quinlan courtyard as plaza 64 4 68
Expanded multi-use path network 87 1 88
Bike connections to City-wide network 115 0 115
Additional parking 92 9 101
Drop-off area 10 0 10
Additional trees 160 2 162
Additional cherry trees 112 5 117
Additional planting areas 51 2 53
Trees (existing) 67 2 69
Total 2733 98 2831
Table C-64: Round 2 Survey Question 5 Results
-
Appendix C Community Engagement Data C-113
Figure C-77: Round 2 Survey Question 5 Results
QS. Which features of Concept C do you like MOST?
Enhanced entry
Senior Center deck as component of entry plaza
Event lawn
Picnic area with shade
Relocated/upgraded restrooms
Interactive cultural exhibit area
Event plaza
Passive garden walk
Group picnic area with shade
Upgraded playground
Relocated/expanded amphitheater
Dual-use tennis and pickleball courts
Quinlan courtyard as plaza
Expanded multi-use path network
Bike connections to City-wide network
Addit ional parking
Drop-off area •
Additional trees
Additional cherry trees
Additional planting areas
Trees (existing)
0 Select (3) three.
so 100
■ English ■ Mandarin
150 200 250
-
300
C-114 Memorial Park Specific Plan
Round 2 Survey Question 6: Which feature of Concept C do you like LEAST? Select one.
Answer Options English Mandarin All Responses
Enhanced entry 68 3 71
Senior Center deck as component of entry plaza 73 3 76
Event lawn 34 0 34
Picnic area with shade 4 0 4
Relocated/upgraded restrooms 9 1 10
Interactive cultural exhibit area 176 3 179
Event plaza 39 0 39
Passive garden walk 21 1 22
Group picnic area with shade 5 1 6
Upgraded playground 12 1 13
Relocated/expanded amphitheater 172 6 178
Dual-use tennis and pickleball courts 159 10 169
Quinlan courtyard as plaza 34 0 34
Expanded multi-use path network 9 0 9
Bike connections to City-wide network 35 4 39
Additional parking 58 1 59
Drop-off area 22 1 23
Additional trees 10 0 10
Additional cherry trees 13 0 13
Additional planting areas 19 0 19
Trees (existing) 3 1 4
Total 975 36 1011
Table C-65: Round 2 Survey Question 6 Results
-
Appendix C Community Engagement Data C-115
Figure C-78: Round 2 Survey Question 6 Results
Q6. Which feature of Concept C do you like LEAST?
Enhanced entry
Senior Center deck as component of entry plaza
Event lawn
Picnic area with shade ■
Relocated/upgraded restrooms -
Interactive cultural exhibit area
Event plaza
Passive garden walk
Group picnic area with shade •
Upgraded playground -
Relocated/expanded amphitheater
Dual-use tennis and pickleball courts
Quinlan courtyard as plaza
Expanded multi-use path network •
Bike connections to City-wide network
Additional parking
Drop-off area
Additional trees -
Additional cherry trees -
Additional planting areas
Trees (existing)
0 Select { l) one.
20 40 60 80 100 120 140
■ English ■ Mandarin
-
160 180
C-116 Memorial Park Specific Plan
Round 2 Survey Question 7: What is your PREFERRED park concept? Select one.
Answer Options English Mandarin All Responses
Concept A: Community Focus 480 21 501
Concept B: Nature Focus 380 10 390
Concept C: Civic Focus 115 5 120
Total 975 36 1011
Table C-66: Round 2 Survey Question 7 Results
Figure C-79: Round 2 Survey Question 7 Results
-
Q7. What is your PREFERRED park concept?
Select ( l) one.
Concept A: Community Focus
Concept B: Nature Focus
Concept C: Civic Focus
0 100 200 300 400 500 600
■ English ■ Mandarin
Appendix C Community Engagement Data C-117
Round 2 Survey Question 8: What do you like most about your preferred concept? Select one.
Answer Options English Mandarin All Responses
It has recreation amenities I like 120 4 124
It has play spaces and experiences I like 116 4 120
It has recreation opportunities for all ages and abilities 182 9 191 It has recreation elements the community needs 81 5 86
It has the nature experience I’m interested in 136 4 140 It offers desirable places to hang out and have fun 79 1 80 It is bike-friendly 10 1 11
It makes the park and its amenities easy to access 5 1 6 It facilitates large festivals and events 30 1 31
It represents the unique character of Cupertino 12 1 13 It has amenities appealing to seniors 13 1 14
It creates opportunities for social gatherings and community activities 69 1 70
It has the best green space/open space features 59 2 61 I don’t like any of the concept features 9 0 9
I like all three concepts and features a little bit 54 1 55 Total 975 36 1011
Table C-67: Round 2 Survey Question 8 Results
-
C-118 Memorial Park Specific Plan
Figure C-80: Round 2 Survey Question 8 Results
-
QS. What do you like most about your preferred concept? Select ( 1 ) one.
It has recreation amenities I like
It has play spaces and experiences I like
It has recreation opportunit ies for all ages and abilities It has recreation elements the community needs
It has the nature experience I'm interested in
It offers desirable places to hang out and have fun
It is bike-fr iendly •
It makes the park and its amenities easy to access •
It facilitates large festivals and events
It represents the unique character of Cupertino •
It has amenities appealing to seniors -
It creates opportunities for social gatherings and ...
It has the best green space/open space features
I don't like any of the concept features ■
I like all three concepts and features a little bit
0 so
■ English ■ Mandar in
100 150 200 250
Appendix C Community Engagement Data C-119
Survey #2 Question 9: What do you think is MOST IMPORTANT to include in the final design? Select three.
Answer Options English Mandarin All Responses
Enhanced Entry 37 3 40
Event Plaza 38 3 41
Event Lawn 75 2 77
Relocated/Upgraded Restrooms 164 3 167
Upgraded Amphitheater 128 3 131
Relocated/Expanded Amphitheater 84 3 87
Passive Garden Walk 177 6 183
Educational Garden Zone 70 2 72
Group Picnic Area with Shade 102 3 105
Picnic Area with Shade 150 6 156
Upgraded Playground 144 15 159
Relocated/Expanded Playground 120 8 128
Nature Playground 120 5 125
Fitness Stations 59 59
Bike Traffic Garden 49 4 53
Bocce Ball Courts 32 1 33
Table Games (e.g., ping pong, chess) 54 1 55
Senior Center Deck as component of Entry Plaza 21 1 22
Interactive Cultural Exhibit Area 26 1 27
Softball Field (Existing) 99 3 102
Dual-use Tennis and Pickleball Courts 47 4 51
Dedicated Tennis Courts 76 3 79
Dedicated Pickleball Courts 162 5 167
Quinlan Courtyard as Event Space 15 15
Quinlan Courtyard with Seating 14 1 15
Quinlan Courtyard as Plaza 8 1 9
Expanded Multi-Use Path Network 38 1 39
Bike Connections to City-wide Network 62 62
Additional Parking 70 7 77
Drop-off Area 9 9
Table C-68: Round 2 Survey Question 9 Results
-
C-120 Memorial Park Specific Plan
Survey #2 Question 9: What do you think is MOST IMPORTANT to include in the final design? Select three. (continued)
Answer Options English Mandarin All Responses
Additional Cherry Trees 53 3 56
Additional Trees 142 142
Additional Planting Areas 32 2 34
Trees (Existing) 35 35
Total 2512 100 2612
Table C-69: Round 2 Survey Question 9 Results (continued) -
Appendix C Community Engagement Data C-121
Figure C-81: Round 2 Survey Question 9 Results
Q9. What do you think is MOST IMPORTANT to include in the final design? Enhanced Entry
Event Plaza
Event Lawn
Relocated/Upgraded Restrooms
Upgraded Amphitheater
Relocated/Expanded Amphitheater
Passive Garden Walk
Educational Garden Zone
Group Picnic Area with Shade
Picnic Area with Shade
Upgraded Playground
Relocated/Expanded Playground
Nature Playground
Fitness Stations
Bike Traffic Garden
Bocce Ball Courts
Table Games (e.g., ping pong, chess)
Senior Center Deck as component of Entry Plaza
Interactive Cultural Exhibit Area
Softball Field (Existing)
Dual-use Tennis and Pickleball Courts
Dedicated Tennis Courts
Dedicated Pickleball Courts
Quinlan Courtyard as Event Space -
Quinlan Courtyard with Seating -
Quinlan Courtyard as Plaza -
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-off Area -
Additional Cherry Trees
Additional Trees
Additional Planting Areas
Trees (Existing)
0 20
Select (3) three.
40 60 80 100 120 140 160
■ English ■ Mandarin
-
180
C-122 Memorial Park Specific Plan
Round 2 Survey Question 10: Please select your age group: (optional) Answer Options English Mandarin All Responses
Under 10 years old 8 2 10
11 to 18 years old 28 28
19 to 24 years old 11 11
25 to 34 years old 101 4 105
35 to 44 years old 214 17 231
45 to 54 years old 177 7 184
55 to 64 years old 223 3 226
65 to 74 years old 137 2 139
Total 948 36 984
Table C-70: Round 2 Survey Question 10 Results
Figure C-82: Round 2 Survey Question 10 Results
-
Under 10 years old
11 to 18 years old
19 to 24 years old
-
25 to 34 years old
35 to 44 years old
45 to 54 years old
55 to 64 years old
65 to 74 years old
0 Ql 0. Please select your age group:
(optional)
so 100 150
■ English ■ Mandarin
200 250
Appendix C Community Engagement Data C-123
Round 2 Survey Question 11: Please select your household composition: (optional) Answer Options English Mandarin All Responses
Single 88 1 89
Couple 249 6 255
Unrelated household 4 4
Family with youth under 18 years old 347 19 366
Multi-generational family with youth under 18 years old 65 7 72 Family or multi-generational family (all over 18 years old) 156 1 157 Prefer not to say 31 31
Total 940 34 974
Table C-71: Round 2 Survey Question 11 Results
Figure C-83: Round 2 Survey Question 11 Results
Ql 1. Please select your household composition:
(optional)
Single -
Couple
Unrelated household I
Family with youth under 18 years old
Multi-generational family with youth under 18 years old - Family or multi-generational family (all over 18 years old) Prefer not to say -
0 so 100 150 200 250
■ English ■ Mandarin
-
300 350 400
C-124 Memorial Park Specific Plan
Round 2 Survey Question 12: Which of the following applies to you? Select all that apply. (optional) Answer Options English Mandarin All Responses
I live in Cupertino 792 34 826
I work in Cupertino 215 8 223
I attend school in Cupertino 142 8 150
I use Cupertino parks 669 20 689
I visit shops, restaurants, and service businesses in Cupertino 653 19 672 None of the Above 1 1
Total 49 1 50
Table C-72: Round 2 Survey Question 12 Results
Figure C-84: Round 2 Survey Question 12 Results
-
Q 12. Which of the following applies to you?
Select all that apply. (optional)
I live in Cupertino
I work in Cupertino
I attend school in Cupertino -
I use Cupertino parks
I visit shops, restaurants, and service businesses in Cupertino None of the Above
0 100 200 300 400 500 600 700 800 900
■ English ■ Mandarin
Appendix C Community Engagement Data C-125
Round 2 Survey Question 13: How far do you live from Memorial Park? (optional) Answer Options English Mandarin All Responses
Less than ½ mile 170 12 182
Less than 1 mile 258 4 262
Between 1 and 5 miles 494 18 512
More than 5 miles 36 1 37
Total 958 35 993
Table C-73: Round 2 Survey Question 13 Results
Figure C-85: Round 2 Survey Question 13 Results
Less than ½ mile
Less than 1 mile
Between 1 and 5 miles
More than 5 miles ■,
0 Q13. How for do you live from Memorial Pork?
(optional)
100 200 300 400
■ English ■ Mandarin
-
500 600
C-126 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses
Please add more dedicated tennis courts
Add additional park benches along walking paths.
Memorial Park is great. I love the events, the theater performances, and most of all the tennis! Please do not cannibalize the tennis courts for pickleball. There is enough room to keep all the tennis courts as is and also build dedicated pickleball courts. Whenever I go to Memorial Park to play tennis, the courts are crowded. Thank you! Don't put anti-homeless, hostile architecture.
Please plant more trees to compensate for the lost canopy during the other development projects such as the Oak Shopping Center and Marina Foods plaza. We need a lot of shade for 9 months out of a year for outdoor recreation.
Please include more park benches and shade.
Pickleball is a rather special social activity serving age groups that Park & Rec departments often ignore. It takes studies for outsiders to understand the game’s significance and value as a recreation for the community.
Hi. We are excited for the revamp. What is most important is making both playgrounds accessible for all. So all inclusive playgrounds, especially in the biggest park we have that is used for the biggest community events. It’s important to provide accessibility to all. Thank you
Please do NOT do dual striping of tennis and pickleball courts. Please do NOT add dedicated pickleball courts.
Pickleball is a noisy sport and will ruin the peace and tranquility of the nature theme focus of the park and the ability to enjoy quiet time in the park.
Plan for trees for 50+ years
Making the park multi-generational should be the focus. Integrating the Senior Center, enhancing the amphitheater, including a multi-age playground and inter-connecting bike paths/footpaths to different points outside of the park that have been outlined in some of the plans will do this. Garden paths and large spaces for events are important but can be made a smaller part to allow for the other uses to shine. Get rid of the tennis/pickle-ball...there are many other parks that have them around the city, as well as the Rec center right next door! Same with the softball field... Put those spaces to work with activities you can't do somewhere else -- bocce is a great alternative idea.
With added housing being built we need more green spaces -this is an important project for our mental health possibility of a future pool area with classes for the community I like all the ideas, it’s hard to choose. I think you’ll be successful/ I’ll be satisfied no matter which design wins Just keep it citizen friendly....
More Restrooms
Please include a Designated Off-Leash Area (DOLA) for dogs and their owners to congregate. I didn't see a DOLA factored into any of the 3 concepts. This is absolutely essential as dogs are a huge part of our community and community-building efforts as well!
Please consider carving out an offleash dog play area. Memorial park is used by a multitude of people who walk and socialize their dogs.
Table C-74: Round 2 Survey Question 14 Results
-
Appendix C Community Engagement Data C-127
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Pls do not allow adult bikes inside the park. City already carved out dedicated paths in many, many street, please do not deprive pedestrians of their safety and peace of mind.
What would be the regulations about pets?
Pickle ball court can be controversial due to its noise concern.
1. All picnic tables and play spaces must provide shade (summers are only getting hotter)
2. Love the expanded amphitheater idea, but cannot locate it next to tennis courts due to noise interference (music vs. bouncing balls/outdoor voices)
3. Any way to expand the dance area in front of the stage would be great, other than of course locating next to tennis
4. Might it be possible to create an event space that includes shade? Please make sure it continues to be a good place for community events and festivals.
Pickleball courts need to be separated from tennis courts We come to Memorial Park with our two boys all the time. We would love to see the play structures updated. We also enjoy all the open grass space for running and playing. On Memorial Day each year, we visit the war memorial in the park and try to educate our children about those who have sacrificed for our country, so if you were to consider putting in some kind of cultural option, it would be nice if you were to keep it within that thematic realm. We really appreciate that monument portion of the park, and it is the specific reason we started coming to the park in the first place.
A large amphitheater—and we have been to many events at the current one—may be problematic for people living along Christiansen if it is moved there. We participated in the original Quinlan planning and felt the needs of both neighborhoods were listened to and well addressed. We no longer live near there but hope the improvements will be done with the same care.
Would like a dog park
I use Memorial Park today to play pick up soccer games for my daughter and other girls in the neighborhood (7-8 yrs old). The biggeste complaint we have about the lawn area is there is NO EVENING LIGHTING FOR ANY CUPERTINO PARKS. As soon as daylight savings comes around, it is hard to see and play in the dark. Other cities have soccer fields and lawns with evening lights to enable play all year round. Cupertino is severely deficient in this area for Memorial Park and Jollyman Park designs.
Thanks for creating options and asking residents their opinions.
Would like to see Dogs Off leash area in the grassy fields I noticed that none of the concepts kept the existing playground (Stevens Creek). I think it is one of the best in the city and it is close to Faria and Garden Gate Elementary. Why isn't it in any of the new concepts? If it ain't broke, don't fix it ... but we are going to remove it entirely? In addition, the city spent a lot of money removing the ponds and the new renovation is quite nice. Why spend more money and time on further construction? Thanks for the new pickle ball striping on Court 2. It would be better to have a few dedicated pickle ball courts than to have temporary ones.
Have softball leagues go to other parks or schools
Please include off-leash dog area. If there are concerns about dogs in the park, perhaps a fence/partition could be built.
Geese make the park unpleasant
We need diversity of recreation - we should keep softball and add pickleball.
Table C-75: Round 2 Survey Question 14 Results (continued) -
C-128 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
It is very important that we have dedicated pickleball courts. We have been chased off the one available dual striped courts by tennis players even when other tennis courts are available to play tennis on.
Please prioritize adaptation for climate change, plant lots of trees and build lots of atructures for shade, minimize the need for watering, and expand parking.
I miss fountains in the park.. Such a great feature to lift up spirits. My kids have fond memories. They grew up with fountains. Wish there was at least one fountain feature in the park.
BIG PICTURE: It is a huge park - take advantage of what you can do here that can't be done at any other park in the city, rather than chop it up too much. PERSPECTIVE: The park was an eyesore for years because the ponds were empty and much of the grass was dead. The ponds have been filled, and the park now has beautiful expanses of grass for playing and events (I know this is transitional, but as a Garden Gate resident, I wish something like this was done years ago!).
The park still has its amphitheater, play equipment, sports courts, picnic areas, bathrooms, and community center/ senior center access. What in these plans remain true functional gains? FOR THE NEIGHBORHOOD: It has been a long time since this neighborhood had a beautiful park.Try to maintain as much function and beauty during the next stages.
Dedicated pickelball courts open to public
"Sufficient handicap parking
Seating (benches) scattered and by playgrounds
Keep mobility difficulty in mind -ADA accommodations for all ages/needs (as possible)" I'm happy with all of these concepts. Looking forward to seeing how the park evolves.
Memorial Park is the only big enough park in the city to host large community events. Do not remove that option from the park redesign.
Any new planting should hopefully focus on only plants native to our region Excited about updated amphitheater! My favorite Cupertino events are the summer concerts in Memorial Park Dedicated Pickleball courts sound great!! Cupertino needs public courts like other cities in the area. We are far behind! Pickleball is the fastest growing sport in the US and accessible for all ages. I have to drive far to Palo Alto, Los Altos, and Mountain View to access public courts.
Make it nice but don't spend too much. Other parks need enhancements too.
A dog park here would be awesome! Also, we would book events here more if there was more shade/shelter from rain We really need pickleball courts
Thanks for taking this seriously. The removal of the ponds last year was already a huge improvement. Cupertino is awesome!
PLEASE keep the veteran statues and plaques! Also, restrooms desperately need an upgrade! Make playgrounds, picnic areas and clean restrooms the focus. What serves our littlest community members (children) serves our seniors too because our grandparents take the kids to the park all the time. Make it a high class, luxurious experience like Bill's Backyard at the Children's Discovery Museum of San Jose. as a program coordinator and also having worked in the main P&R office, i think option one is most appealing and cover all uses/need of this park. From picnic rentals, to summer camps and events, to citizens walking their dogs. It checks all boxes for me :)
Table C-76: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-129
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Please include playground updates! So important for the children! Please do not waste money on making it look fancy with pretty entry ways. Also, do not put things that require cement in replacement of the grass. It is already a very busy park, we do not need it to be more busy. Bigger playground and a safe place for kids to have fun is most important.
I appreciate the attempt to incorporate and adapt to the mixed uses of the park. My kids are just barely adults now but our family used the park in a variety of ways over time.
Pickleball is the fastest growing sport in the US, and is social, inclusive and can be played at any age. Cupertino needs DEDICATED pickleball courts. Dual use (tennis + PB) usually means bringing your own net and is harder to play on a dual-striped court. Please give dedicated PB courts serious consideration. There are too few courts for the growing number of players and popularity of this sport.
Additional trees and drought tolerant plants. More distinctive facade along Stevens Creek Providing more shade and nature elements to the park will definitely make it feel more welcoming and relaxing for families and their children to unwind and enjoy throughout the week after a busy day at work and school. While making it a location to gather with family and friends over the weekend as well.
Thank you for giving this park the love it deserves and for making it so easy to give feedback! Make it a space where kids can play and families can enjoy (birthday parties). Make it appealing for strolling around w greenery and shade.
I really want some water feature, either a water play area for children or a pond or water fall as part of a garden feature.
The only time we go there is for Shakespeare in the summer.
Please continue allowing dogs.
Add off leash areas for dogs
I love that these plans exist. I've always been sad that Memorial Park seemed underutilized relative to other parks that seem to have so much life. Like Mountain View's Cuesta park. It seems like it would be interesting to have some kind of retail stuff nearby. A coffee shop or something. I'm not sure what's going on in terms of the retail under construction, but even some nice vending machines like in Japan would be convenient.
Playgrounds are very important. I really liked the nature playground concept as it is unique, different from other playgrounds around the area.
I strongly suggest the program that ceramic class for senior in Cupertino. please compare the ceramic program of the Sunnyvale and Palo Alto community.
Please add a basketball court so I don’t have to join sports center just to play basketball I'm really excited about the revitalization work! All three plans look solid. The park is a great community resource, and I hope the enhancements make it even better for current and future users.
Please add a basketball court
Biking and parking access should be included in any plan that is chosen.
Need a dog off leash area and timing
Table C-77: Round 2 Survey Question 14 Results (continued) -
C-130 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
I and many of my friends frequently play pickleball but it is hard to find community places in which to play. Pickleball is the fastest growing sport in America and court demand has switched dramatically from tennis to pickleball. Our community space allocation should reflect the rapidly growing demand for pickleball courts.
Having lived in Cupertino since 1964 I grew up using Memorial Park and think of it as the heart of our lovely city.
Many family picnics and events over the years have been enjoyed at this park. My hope is that whatever revitalizing is done it will continue as a lovely park and our heart and soul for generations to come.
I really like the addl trees & plantings, the expanded playground next to the shaded group picnic area, the beautiful passive garden pathways & the Quinlan event & conversation areas. I don’t have an opinion on the athletic spaces but would love to see expanded decking/seating for the senior center as well as new event center with cherry tree plantings! Maybe use cultural & heritage art/structures as decorative entries but let the trees be the real entry structures.
Would like to see the bocce ball courts moved from Blackberry Farm to Memorial Park. Better access and easier to co- ordinate with Senior Center staff.
I host a series of popular summer bike workshops at the Senior Center. The workshops start off with a safety class in the Reception Hall, which is adjacent to the Senior Center Deck. During the class, up to 30 students and instructors park their bikes on the deck. One City staff member (often myself) guards the bikes so they do not get stolen during the class.
This deck has been a great bike storage area, but would be even better if it was secure so a person doesn't have to guard the bikes. I hope the deck can stay as is. If the deck gets turned into the Senior Center Entry, please make sure there is an alternative space for up to 30 bicycles to park. If the bikes are allowed into the room where the class is taking place, this would be a fine alternative. Or if another paved outdoor space is created, that would also work. It would work extra well if the space is enclosed and secure so nobody has to guard the bikes.
Make it a pleasant place to walk and have community events.
I like the original water pond. It provides a relax environment. What happened to that? It seems obvious that the highly used softball field should stay. I don’t play, but lots of people enjoy it very much. In general, I see little value in proposed changes. We waited years for the existing park to be fixed only to find it’s beauty ignored. This process has not achieved what I had expected or wanted.
Pickleball is such a popular and growing sport and we feel Cupertino needs more dedicated pickleball courts! The sport caters to all ages.
The community park concept could use one of the event lawns or the gazebo area to incorporate one of the ideas of the other models (interactive cultural exhibit, nature area/playground, etc). Not sure when we would need to have two different event lawns that are on opposite sides of the park. Also, the idea to break up one tennis court into 4 pickle ball courts is great, I would include that in whatever plan goes through.
Keep it green, keep it natural
Add benches scattered around park. Today the benches are concentrated near the Memorial.
Need a system for preventing groups from monopolizing the tennis courts for the entire day.
Maximize nature and create garden settings that can be enjoyed by all. Balance large public spaces with traffic concerns.
Please bring water features (a small lake or pond, fountains....) to the park.
Table C-78: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-131
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
My kid enjoyed that there were two playgrounds at Memorial Park. It is important to consider play value when designing a playground/play area. Kids like to climb and explore, slide and swing, etc. not just sit on a concrete mushroom or crawl through two unimaginatively arranged concrete 'logs' (as in Main Street Cupertino "park"). Themed playgrounds can be really neat, but I've never seen a truly fun nature-themed playground.
Great ideas. All are an improvement over the existing park.
If upgrading playgrounds, please add all-inclusive elements. For bathroom renovations, please add only gender- inclusive bathrooms and family bathrooms that can accommodate children or an adult needing assistance and a care giver. Inspiration Playground in Bellevue, WA is a great example of an all-inclusive playground.
Please deter the Canada Geese!!!
There should be some type of water feature such as a fountain or waterfall.
The east/west bike connections/path look great. The north/south bike connections are not as clear - assuming biking through the existing parking lot, on past the tennis courts, and past the small auxillary building to exit the north end of the park will remain (and improve)?
My children are grown now but I like concept A best as it seems to provide a good balance and range of options for families, small and large group gatherings.
As a couple hoping to expand our family soon, I’d love to see the multiage playgrounds have something like a splash pad too!
I'm for removal of the baseball diamond and not in favor of an expanded amphitheater there. These very large spaces I believe would be getting less use on a daily basis, where other ideas appeal to a wider range of audiences at all days and times.
Only place in town for big festivals.
I'm sorry to see the pond go. It made the park feel more expansive than all these close-in elements.
Pickleball is gaining in popularity and is a sport that seniors can play well. With the senior center and adjacent senior housing in the site of the former Oaks shopping center, dedicated pickleball courts will be a highly utilized recreation resource for the city.
There needs to be more attention to pickleball. This sport is growing very rapidly, and all three plans do NOT pay enough attention to this growing need, especially of the aging population in Cupertino.
Please don't remove the softball field - more and more fields are disappearing, and there are fewer and fewer places to play softball, which is a sport that allows dozens of people to play at once, thereby serving a large constituency.
I think the goal should be a beautiful, casual space that has all the amenities needed for a fun or relaxing visit. Good restrooms, a play area that is geared to all ages & abilities, some quiet space to enjoy nature, nice walking area.
We love being able to walk to Memorial park to play softball through the city, and would be saddened if the field is demolished
The current memorial park is perfect after replacing the pond with grasses. We don't need any additional building or improvements. Save the money for the city and preserve the natural beauty of the park is all we need.
Drop off and parking at Anton and Alves would be a traffic nightmare Keep and upgrade the softball field!!!
Table C-79: Round 2 Survey Question 14 Results (continued) -
C-132 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Beach Volleyball, grass volleyball courts
Please keep the softball fields! Softball is the only adult, group sport that many people can play. We use the softball fields every week and during the summer, spring and fall, it’s multiple times per week. This is the only field that as adults over the age of 20, we have access to and there is a huge community of adult athletes that would be devastated by the loss of this field.
I really feel that the softball field should be replaced. It seems to serve a smaller portion of the community when compared to the space it takes up.
Dedicated pickleball courts are desperately needed in the area - much more so than additional tennis courts.
The park needs to be able to accommodate more parking. A 2+ story parking structure at: (1) @current location by Quinlan Center, or (2) at the proposed location, (corner Anton & Stevens Creek).
Please make it dog friendly. There's a lot of folks who walk their dogs in the park. I didn't see any enclosed dog park? The one on Mary is a joke. It's animal abuse...
I should include the caveat that I don't visit Memorial Park very often, as there are closer parks to my home which I prefer over Memorial Park. I think that all three of these concepts are a massive improvement on the current state of Memorial Park, and no matter which one ends up being chosen I look forward to visiting the improved park more frequently!
I was born and raised here in Cupertino and have always loved this park. I'm sad the ponds are gone and sad The Oaks is gone. Memorial is pretty amazing as it is. Please don't change too much! A traffic garden, being so unique among neighboring cities, could be somehow shared (for revenue?) with Sunnyvale, Saratoga, Mtn View, for their school districts.
Please add dedicated pickleball courts to Memorial Park. The court at the Cupertino Sports Center is a mixed-use court for badmitten and other sports and there are too many different lines. The use of Court 2 for Pickleball is too infrequent and a net should always be available. Today, we have to drive to San Jose to play.
Please include free dedicated Pickleball courts!
Nothing that is duck friendly.
Avid pickleball player hoping to see more dedicated courts which are much nicer than the dual tennis/pball with overlapping lines. Hoping to also see at least one tennis slab of the 6 tennis courts concerted to 2-4 dedicated pickleball courts (permanent netting/holders, one set of lines, etc). Thnks As a pickle ball player, I would love to see dedicated courts. It's very confusing to have double-striped courts and you can fit twice as many pickle ball courts on the same room as a tennis court.
1. ConceptC: additional parking on Anton *will* cause accidents; 2. ALL: images chosen for illustration of new features show things that are too busy, ugly and have too much concrete (e.g. artificial shade for picnic spots, one big awful playground instead of current more intimate spaces, 3. Educational garden is TOO much for this park -- plus we have at McClellan Ranch and Rancho that do it better already. Don't fill up park with too much junk! 4. NO bikes paths cutting through park -- it is not a COMMUTING place, it is a park! Please don't waste money on silly stuff like "enhanced entry." It adds zero value to the park. 2 bocce courts please. Cupertino senior center currently uses blackberry farms bocce courts which are less convenient.
We have 12-16 players every week in the summer.
Table C-80: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-133
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
You must add a world class skateboard park and a world class BMX park. Do something for the teens/youth of this city! Get them outdoors enjoying the recreation they want! Your concepts serve adults and young children only.
Also, too much use of the words ""natural"" and ""nature"". Memorial Park is a man-made park. It is not in any way a "natural" setting. Fremont Older Open Space Preserve, Stevens Creek Co. Park, Montebello Open Space Preserve, and the back country parks of Rancho San Antonio are ""natural"" areas. Memorial is not and never will be "natural". keep it green
Please add more pickleball lines to tennis courts and dedicated pickleball courts. We have 20+ people on some nights playing pickleball and it is growing at a rapid rate where we'lll see that much per night and probably 30-40 pickleball players within 12 months.
Keep things safe for everyone and don’t use Round Up herbicide which is linked to cancer.
Regarding additional parking space, utilizing the parking space of Cupertino Sports Center is good. Their parking space near North Stelling Road is empty, as it's not accessible from North Stelling but that is only the exit point, so most cars don't park there. If that parking lot becomes the parking lot for Memorial Park, then, that will become the entrance to Memorial Park, with easy access. 40 more cars?
Love the inclusive and accessible ideas presented!
Mature trees are very important. It will take decades for newly planted trees to reach a shade-appropriate size.
Please add mature trees to the plan. Don’t cut down any of the current trees that are there! Also, trees need to be surrounding the amphitheater. If you have ever been there during the day, people won’t sit in direct sunlight to watch a performance. They are all hiding under shade (trees, of course)! I would like to see dedicated Pickleball courts. It is known that tennis players and Pickleball players do not get along and would not be able to share courts.
The more trees and nature would help the city and environment the most.
Keep the softball field
Over all a well managed park with shade and amenities for various types of recreation.
More trees, greenery, native plant areas, shade and walking paths. Less concrete than in some of the options. And definitely no parking/drop off areas along Anton. This is a short street, mostly next to homes, and more traffic/parking would disturb the quietude of the neighborhood, and cause inconvenience to residents. We are already inundated with traffic and noise from festivals/events, and adding parking lots on Anton would cause additional problems to people living at The Commons, and detract from our park-like environment. The intersection of Anton and Alves is already an almost blind corner, and with more foot and vehicle traffic would become much more of a danger for both pedestrians and cars.
Please, please make dedicated pickle ball courts. It's the fastest growing sport in America, and there is a severe shortage of places to play. Consider making more, like a combination of A & B. Or, do the ground work for new courts, with the option to convert tennis courts to pickle ball courts in the future.
And, thanks for all your good work and outreach. These plans represent lots of work and cooperation! Please try to plant all (or at least mostly) native plants! It will make the park more drought-resistant and save on water use, and it will also be great for local wildlife and the environment! Plus, it will be an opportunity for passive education for those who visit the park, even if there's not really a budget for active education programs The nature concept appeals most to us as a multi-generational family with young kids.
Table C-81: Round 2 Survey Question 14 Results (continued) -
C-134 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Please have dedicated pickleball courts. This is the fastest growing sport and appeals to all ages. I would prefer a place I can go to regularly for exercise rather than the occasional event. Thank you.
I think the most important things for a park is having a spacious and interesting playground, bike trails, garden walk trail, lawn, picnic areas with shade.
Please do not remove any tennis courts … they are hard to come by and heavily used.
Lawns take more water than fountains. I would love to see a more sustainable park with draught-resistant plants and lots of medium-large rocks to reflect our natural California environment (including surrounding areas).
Definiely keep softball field and expand the amphitheater for bigger musical events. Rest rooms certainly need to be upgraded.
It has been a great place to take our children, and have small family and group picnics. Also the Shakespeare in the Park has always been a favorite over 30 years. I really like walking around Memorial Park.
I am concerned about the noise generated from the implementation of pickle ball courts. I think one needs to ask will this be a sport that becomes as long lasting as tennis or just a passing fad? Both suggested and existing park entries need to have some sort of security, such as cameras or a park ranger. This just seems necessary with the current level of gun violence in our society today.
No pickleball courts. Neither dedicated nor dual use. No using park space for bikes. We don’t want the nuisance of bikes in the park. We want a peaceful tranquil nature focussed park.
Please do not lose the softball field! MANY people, like myself, enjoy it multiple times a week. Also: less grass, more trees/shrubs! (Drought-tolerant!)
Please add dedicated pickleball courts. Thank you!
We should think from an upper level, such as a whole city's needs and every group of people's needs, not try to put everything inside one park. For example, does Cupertino have enough all-inclusive playgrounds for kids? (Currently, ZERO. One in the future) Does Cupertino have softball fields (Jollyman park has one, and not being occupied most of the time)? Does Cupertino have enough soccer fields? I believe so, and soccer is very popular among kids and teenagers.
Does Cupertino have parks for event holding? We may need one for this, and having multiple usages is better. For example, people or dogs can use the lawn without an event. Does Cupertino have enough hiking trails? I think so! Let's think about this from another point of view. Does Cupertino have enough attractive playgrounds/amenities for kids? It seems not. Does Cupertino have enough sports fields (tennis, pickleball, basketball, soccer, etc.) for older kids or teenagers? I know there are multiple, so the number is in good shape, except for pickleball. Does Cupertino have enough amenities/places for people between 20-40? (hmm, hard to say. Maybe plenty of restaurants and shopping is good, especially if we will have Vallco mall rebuilt) Does Cupertino have enough amenities/areas for seniors? (parks, trails, classes, etc.) Does the whole city have enough trees and plants? For me, the streets are pretty bald compared with other nearby cities. Does Cupertino have enough bike trails? Is it safe enough? We should think from an upper level and design our parks and spaces based on the needs of the whole city.
In my opinion, Cupertino doesn't have enough amenities/spaces/areas for younger generations, especially parents under 40yr with small kids.
It's better to diversify the spaces/areas from the view of the whole city.
Table C-82: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-135
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Please keep the tennis courts and do not change the tennis courts or any area of the tennis courts to pickleball Need gathering spaces, places to dance. Comfortable places for every age to hang out. Safe places/times to let the dog run off leash!
Memorial Park does not have to have a specific identiy. Nature specific parks in Cupertino are McClellan Ranch, Blackberry Fam, and Linda Vista. Memorial park should be all blended with Concept A, Community, Concept B, Nature, and Concept C, Civic to meet all residents' interest. Memorial Park is the main park in the Cupertino. The Memorial Park should be for enjoyable park for everyone. It is a good concept that the least amount of interest Softball field becomes the multi age play area. However the playground is too small after removing the 2 existing playgrounds. It should be much bigger, safe, all inclusive playground for children for all ages and abilities. There are large population of aged group, but Cupertino should a little more focus on the families with children in order to avoid closing schools anymore. The current playgrounds are unsafe, not accessible for children with special needs.
The playgrounds are full of families on weekends, holidays, days of events, and summer. Summer camp children at Quinlan Center go there during the break. Please more consider about the children. And the play area should be accessible with wheel chair and safe soft rubber ground rather than lawn or wood bark. There are still big fields for event behind the Quinlan Center and next to the Senior Center where events are always held.
Amphitheater should stay at the current location for easy to load/unload equipment and music instruments from Anton and use the big truck entrance during performance and concert. Thank you.
Memorial Park is not a local park but "the" community park for all Cupertino residents. It should be where major summer outdoor events and concerts are regularly held in the city. Its lack of parking and access are its major drawbacks. Forget making the park bike-centric. Stevens Creek Blvd is simply too busy and dangerous to attract cyclist traffic (I say this as an avid cyclist). Plumb Memorial Park with recycled water to bring back water features and attractive green spaces.
New plantings should be California natives, particularly Oaks, as they provide food and shelter for all species.
No one concept is perfect. Difficult task but try and blend the best features of all concepts that serve a majority of cupertino residents. I like the idea of an expanded amphitheater for concerts and bocce courts, but most importantly, the park should serve families. Design should be maintainable financially by city and built with quality materials to last. Keep design flexible to meet future needs or desires. I played softball at Memorial but I question it's use now and space it requires. I really like the pickle ball courts idea. I think the lawn area is great but wondering if we can justify the water use unless recycled water is available. "
Can we please add a golf putting green? There is so much open area near the senior center and the community and the folks at the senior center would benefit by having a putting green there. A golf putting green is a great excuse for Seniors and folks of the community to get outside and enjoy a low impact activity.
Cupertino has many small parks with lots of open green spaces, but is missing more active recreational and social gathering places. Those are included in the community plan.
The amphitheater feature I most like is some grass seating. Please try to keep some of that. I don't see any advantage to a grand entrance, I think the openness of the current layout is very appealing.
A natural park can grow nicer over time, requires little maintenance, water and gives hopefully a good example, what to do in backyards.
Too much parking is devoted to the senior center and is never used. It removes spaces that are much needed for everyone else and makes it more dangerous for little children who are forced to cross the street. A 3rd unconnected street entrance is not desirable. Parking lots should flow.
Table C-83: Round 2 Survey Question 14 Results (continued) -
C-136 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Creative ideas. I will applaud whichever design is chosen. Thank you! Exhibit areas will be least useful as it requires additional continual effort to make it happen. Otherwise the space will be totally wasted.
Don't use park for tennis or pickle ball courts, bocce ball, softball, etc. These are available elsewhere. Make it more shady, open and kid and family friendly.
Please make expanding and upgrading the playground a priority. My other friends with young children always meet at parks outside of Cupertino (Sunnyvale, Palo Alto, Menlo Park, Santa Clara, Mountain View) because their playgrounds are better. We never go to Cupertino. We also never book Cupertino parks for birthday parties, going far outside the city to book because Cupertino's parks are so outdated! Please upgrade and show some love for the younger families and children. We are the ones that frequent your parks very often.
Playgrounds for kids and area for kids to bike
We love tsking our dog here for walks
We need more shaded playground options as weather continues to go. It’s nice to keep younger kids separate from older kids….we didn’t see how one playground was going to do that. You have to balance the once in a blue events with more regular usage of facilities.
Upgrade the theater
The thing I love most about Memorial Park is Shakespeare in the Park.
Fitness stations are particularly popular in Asian culture, where seniors often exercise and socialize. It is a good way to provide an outlet for those members of our community who are not native English speakers.
If one of the tennis courts had basketball hoops on it, I think a lot of the kids would play. There aren't many parks with hoops in the area, and it's great physical activity, as well as a great way to make friends and play a team sport. Also, tons of people play grass volleyball at Memorial Park. Maybe a sand court would be very welcomed.
Playgrounds are our most important resource -- please go with Option A :-) We need to make sure we fill most of the planting spaces with CA and Santa Clara Valley native trees and plants. How can we make sure most of the plants used in the design are CA and Santa Clara Valley natives? Also, we should not include a big lawn in the park, which goes against the mantra "make water conservation a Californian way of life". For community events, you can use all kinds of surfaces, not a lawn. Non-functional commercial turf is already banned in Southern California.
Please do not add more parking. Please add more protected bike trail connections. Please add additional native plant ecosystems, including planting new native trees like the California Buckeye.
More trees and shade please to encourage use of the park, upgraded restrooms are nice and consider the amphitheater siting in relation to the sun -- so warm in the late afternoon today! Please do not build anymore condominium. We need more variety of restaurants here in cupertino or in Main Street like downtown Mountain View
Skeptical of public art, most of it tends to be weird or unmemorable. Consider pieces that are Instagrammable -- the apple sculpture at Main Street seems to be very popular (and usable as seating). I encourage you to keep a water feature in the park: the fountains and and ponds were a very pleasant memory in my childhood. They keep things interesting, interactive for kids, and can be done with minimal water waste or waterfowl nuisance.
Table C-84: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-137
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Bike racks; as well as recycle & trash disposal throughout the park I would love a mix of the civic and nature aspects!
I think too much lawn does not conserve much water, so we should minimize lawns, but it's important to have space for community events, fairs, etc.
Whatever is done, please make sure it is properly maintained! Please don’t annihilate the natural feel of the amphitheater, maybe terrace it, but the feeling of sitting in a grassy hillside under the trees watching Shakespeare is something I love.Also, maybe see if you can make any fitness equipment be a generator for charging your phone? Idk, that’s probably not viable.
Cupertino is seriously behind other communities such as Los Altos, Mountain View, and Sunnyvale when it comes to play areas for children. We regularly travel to other communities for their playgrounds and I’ve been a resident of Cupertino for 43 years. I own a business in Cupertino. My children go to school in Cupertino. Cupertino should stand above these others communities in at least one area. Let’s make that our parks.
Thank you for using our tax dollars wisely!
I like both concepts of the nature and community plans, I feel that repurposing the softball field offers much more space for opportunities for community togetherness and play
Amphitheater needs to be state of the art with power, access, parking and better ability to handle larger audiences and more events.
Great that you are giving the part a refresh. We used to love the unique western style playground that was there even if it was a bit hazardous. Unique features make a park. Not too much cement is a good thing.
Wish the ponds could make a come-back, but I see that none of the plans include those :-( (understandable with the drought, but still it is a loss...)
We need a softball field for adults in Cupertino. The next nearest softball fields are far away in Sunnyvale and San Jose.
Including exercise equipment that elderly people can use. More elder residents in Cupertino currently.
There needs to be water features and hills and bridges between the hills similar to the islands that are being removed.
Maintain spaces for activities for all ages - should be a true community park This is such an excellent opportunity to add a swimming pool next to sports center. Then membership to sports center can include use of pool. We need an indoor public swimming pool in our city so badly. So many would love to join instead of having to go to other cities for swimming. That is what we must add here.
Remove tennis courts. There are more than enough at Sports Center.
Remove baseball field. It occupies a lot of land vs. its utility to the community.
Please increase the shade on the picnic area
I would love native plants in gardens, and maybe some kind of star gazing experience? where the park is open on certain nights but all the lights are turned off. maybe it could be a cupertino wide thing where everyone turns there lights off?
All three concepts are appealing and would represent a big upgrade to the current park design Table C-85: Round 2 Survey Question 14 Results (continued) -
C-138 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
I believe that this revitalization should not detract from the amenities currently available at the park (i.e. amphitheater, sports areas, event space, picnic areas), while still enhancing Cupertino's ability to host community events. As a Resident of Cupertino for most of my life, I have used Memorial Park for children's camps, Girl Scouting, many sports, meeting friends, and attending theater / cultural events).
With a park of this size, there is a great interest in continuing to offer TWO separate playgrounds. There should be 'inclusive' features included.
I suggest that one playground be an expanded and upgraded playground close to an area where there is at least some parking. And another playground that could be Nature Playground to offer variety. Two playgrounds for SURE.
Events are nice, but infrequent, even with improved spaces. Playgrounds get everyday use and are valuable for children and adults alike.
I do not want to see the softball field (lighted) replaced. I like the idea that it can double as a place for dog socialization and play when not used for softball or other creative uses that residents come up with. Kickball is a possibility - 'Free Play' kind of thing. Having a lighted area could help with event and park programing as well.
Preference is for any suggested multi age 'play area' features to be gracefully dispersed throughout the park, not all in one location - Table Games (e.g. chess, ping pong) , Bocce Ball Court, Bike Traffic Garden and Fitness Stations.
Locating something like a bike traffic garden near a Sr. Center deck could make for nice inter-generational enjoyment.
Educational garden zone is very low priority, and I would prefer space to be put to better, more 'useful' uses. Cupertino already has McClellan Ranch Preserve, Blackberry Farm, Rancho San Antonio, etc, that offer a more appropriate space for this kind of thing.
Enhanced entries likely carry an expense that should limit the number of them. There are 4 min, 6 max enhancements suggested depending on the concept. Please consider using something very minimal on all but one or two of the entrances. For example, plantings, upgrade finishes on the ground, small 'natural, traditional looking' arbors or fences.
Modern, minimalist, metal structures seem very out of place.
A drop off as shown at the corner of Alves and Anton would be a bad idea. That is already not a safe road area.
Any 'drop off' would best be incorporated in an existing parking lot and take up no, or very minimal, area/space in the existing park boundaries. The drop off shown on Anton across from The Commons and Sports Center tennis courts is much better idea if encroaching on park space is needed.
If there is to be an interactive cultural exhibit, keep it at a very minimum footprint. A better location would be at Cali Mill or City Hall. Please consider that this is a park, not a museum, and, based on experience, getting a citywide consensus on what cultural exhibits are appropriate could prove challenging. " There is much too much pavement in these plans; I would like to have the concrete concession for this project. Please focus on more green space and less pavement, perhaps more native plants like the garden around city hall. Also, there are no indications that the playground re-do is going to include an inclusive playground. All city parks going forward should have all-inclusive playgrounds.
Table C-86: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-139
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
KEEP EXISTING AND ADD MORE TREES AS MUCH AND AS HIGH AS POSSIBLE. INCLUDE BIRD SANCTUARIES THAT CHILDREN AND ADULTS CAN WATCH AND ENJOY. INCLUDE NATURE GARDENS AND FITNESS ITEMS. EDUCATE. INFORM. IMMERSE IN CULTURAL AND ART EXPRESSIONS. MAKE IT MORE CALMING AND GROUNDING EXPERIENCE FOR EVERYONE VISITING THE PARK>in this day and age when people struggle to find peace such public spaces must become a sanctum for such and provide peace and joy, a sense of happiness and belonging so that it provides them enough energy and motivation to pick up and thrive! Parks can provide this meaningful experiences for anyone! We can do this together! Please use recycled water.
please leave the pond as is
upgrade existing playground equipment, add new plantings, gardens and shaded seating areas, limit parking along Anton Way, more trees and natural setting
I'd like as many shady areas as possible for walking and sitting. All 3 designs look great." In concept A, I noticed that the parking lot next to the Senior Center would get remodeled to suit the need of the event lawn space next to it. If possible, please do not do this.
It is a wonderful park, where I spent much of my childhood growing up and using the amenities.
Please add dedicated pickle ball courts.
Why do two of the plans have the softball field getting removed lol.
Improving senior center access and providing a lawn for expanded exercise classes and events is critical, as well as creating as many spaces for events as possible. The amphitheater needs to be enlarged and relocated to improve ADA access -- it is too small. Cupertino's population will increase about 20% in the next 5-10 years. Plan for increased usage.
Add dog off leash area
Please add a Dogs off leash area to the plan - dog owners are the most dedicated users of the park 365 days a year two times a day. Do not do disservice to them
Keep a DOLA area
Hope memorial park transformation will enhance the community and recreation needs Event lawn - is this going to be drought proof?
Anything other than concept B is a waste of money. Keep the softball field as they are used frequently by everyone of all ages and creates a a sense of team and community. Keep the tennis courts as they are. The park serves the community very well as they are. Stop wasting our tax dollars on consultants to put together these concepts! Just make sure the park is kept up and safe!
How about a Chinese garden?
Option A offers the two big fields which can be used by the most residents in the most various ways whether DOLA, informal soccer, softball, volleyball, frisbe, sunbathing, picnics, etc. Option B wastes too much field for a little used baseball athletic field. Option C wastes too much field for a tripled amphitheater primarily used for weekend performances.
Option A offers the most flexible two big fields. Option B & C sets aside large spaces for rarely used softball/events.
Table C-87: Round 2 Survey Question 14 Results (continued) -
C-140 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
More natural shade in the parks please (plant trees). Keep the softball field but upgrade the amphitheater.
It goes without saying the most important aspects of this park are the event spaces (for festivals, farmers markets), the amphitheater, tennis and pickleball courts, playground, restrooms and open space and trees. Not in favor of a lot of bike riding in this park. Please have bike racks so people can park their bikes and not be racing thru the park. Please have playground be All Inclusive. I like aspects of B and C but there was not given enough options in survey to indicate that. Like the ability to use park for community festivals (civic) and possibly relocate amphitheater but want to add to more trees and natural surroundings. Having areas outside Quinlan be walled off is not a good idea. Should have pollenating plants but do not need separate garden necessarily. Not sure how much soft ball field is used so if not that popular can use that space for something else. So many choices. Good luck! Please do not change the Senior Center parking lot.
I need the softball field for my recreational needs. I also like the current location of the amphitheater, since it is centrally located in the park with different points of entry.
I like parts of each concept but would like the softball field to stay and be upgraded.
Could a outdoor basketball court be added to the side of the tennis courts next to court 6? I know the survey is to not take comments about the parking lot but Concept A clear shows changes to the parking lot near the Veteran's Memorial. You should leave the parking lots as is if feedback is not wanted on this.
All the concepts are trying to incorporate too many elements. It is important to maintain the walking paths, green and calming natural space that is currently there.
Take the enhanced entry and upgraded amphitheater from Concept A or B, the softball field from Concept B, the upgraded playground (but place where the playground is in Concept B) in and event lawn from Concept C. Don't mess with the parking lot as shown in Concept A.
Please keep the softball field. You can add higher fences in the outfield to protect others in the park .
Thanks for upgrading our park.
Lifelong resident of Cupertino here, asking you to PLEASE keep the softball field. It's a great amenity that already exists and is of great use to the community.
Please keep the softball field for my husband 🙏!
Anything other than Plan B is excessive and doesn’t serve the community. The softball field, for example, is often used by 20 or more people at a time. It brings people together and creates camaraderie. Why get rid of that? There is no other suitable softball field in Cupertino. There’s no need for an expanded playground or amphitheater. Those at best used only at certain times of the year, and there are other nearby options.
Remember maintenance and life-cycle. Everything looks good when it is brand new.
Please keep the softball field.
The seniors implore you to keep the softball field. Thank you for your consideration.
I believe residents will appreciate a natural/green area in the middle of Cupertino. Cupertino has been going through urbanization, a green space is precious.
Retain the existing softball field !! I am a 10-year veteran of the 50+ Senior Softball program. There is no other field for this activity of the caliber of Memorial Park.
Table C-88: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-141
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Losing the softball field would be a huge loss for so many people, including myself! I thoroughly enjoy playing there at least twice a week, all year round, as part of a very large but close-knit “family” of players, of all skill levels. PLEASE PRESERVE THE SOFTBALL FIELD!
I’ve been playing softball with the Senior Center class for 10 years. It’s been a great, healthy activity & I’ve made lots of kind friends. Please don’t remove the softball field.
I really like the nature and civic plans, I think trees and shade are important due to the high heat of Cupertino area especially if lawns are to be implemented and watered
Thank you for organizing this survey. It would be great to retain quinlan and its immediate surroundings as is - including the garden and walk area there. More tress would be great especially around the perimeter of the park and walking paths. Let the park stay a park - let’s not create more built up structures. Open space to move and play is the best way to use community spaces.
Softball is important to me
KEEP THE SOFTBALL FIELD PLEASE! I've been playing and/or attending games here since about 1978(currently through the Thursday GEEZER's) and would hate to see us lose one of the few dedicated fields left in the area.
Include a DOLA park too
Maximize contiguous canopy tree shade over aggregate ground. Please try to avoid a-lot of concrete pads for picnic tables since they radiate a lot of heat during the summer.
Good to have options. The softball field should be kept as the usage is pretty high. It can be somewhat reconfigured to allow for multi-use (Cricket or even fenced dog park).
"Please prioritize incorporating native plants and water-conscious agriculture. Prioritizing sustainability and biodiversity are paramount to ensure quality of life for future generations.
Cupertino can benefit from increased cultural, art, and historical pieces. I would like to see these areas prioritized in the revitalization of Memorial Park."
We should include some public art. (3d-not murals). Integrate it into any area. Rotate the art in and out occasionally.
I'd like to be sure that the City does not use any dangerous chemicals on the grass in all our parks, such as Round-Up.
Unsafe for pets and children (and children at heart) who depend on our parks for their grassy play.
Since the ponds are closed, I think we need to provide water elsewhere for birds and geese who need a place to stop as they travel.
The kids bike park is a fantastic concept and should be incorporated. They are very popular across Europe and would be a huge addition to the community.
Whatever you can do to minimize the water fowl, I’m all for!!! Please no pickleball courts. Tennis players don't have enough courts to play tennis I'm so happy that you're doing this!
I think you should put basketball courts!!!!!
Please provide more tennis courts as folks are always waiting or can't find empty courts. Besides the only other park that has tennis courts is on sara park in sunnyvale bordering cupertino which is too far.
Table C-89: Round 2 Survey Question 14 Results (continued) -
C-142 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Thanks for giving us an opportunity to provide feedback on Memorial Park renovation plans. Concept A, B and C are very helpful. They well demonstrate and visualize different ideas. I live next to Memorial Park. I live here for 25 years. I visit Memorial Park every day. I drive on Alves Dr. and Anton Way every day.
BTW, the survey should include an optional question about how often they visit the park.
Concept A:
1. Multi-age play area : It is too crowded. It looks cluttered with seemingly unrelated items. It would need more space between each other. Cupertino has many parks. We do not want to overload Memorial Park. -- “Table Games” (12): People may prefer to play chess or other board games indoors. If anyone really wants to play them outdoors, they could use existing picnic tables, but I have never seen anyone doing that. -- “Fitness Stations” (11): I would say you are in such a nice park, why not enjoy walking or jogging instead. You can always go to Cupertino Sports Center, located next to the park, for fitness stations. -- “Bocce Ball Court” (13): I wonder how popular bocce is. I suppose that the results of this survey should tell us about it. Stevens Creek Trail has some bocce ball courts. I used to walk there every day and I had never seen anyone playing there while I noticed near-by volley ball courts were frequently used. The bocce ball courts were covered with lots of fallen leaves and dirt. There was no sign of anyone having used them in the recent past. Cuesta Park in Mountain View also has bocce ball courts. I have never seen anyone playing there either during my weekend visits.
2. “Enhanced Entry” (1): The following 2 locations are dangerous places to be entry points. -- Corner of Stevens Creek Blvd. and Anton Way: It is too close to a busy section of Stevens Creek Blvd. People attempt to cut in to the right lane in preparation of entering Fwy 85/280 North from a junction 1/4 mile ahead. -- Corner of Alves Dr. and Anton Way: It is a blind corner. BTW some people use Alves and Anton to bypass the busy intersection of Stelling and Stevens Creek. They are often speeding.
Concept B:
1. “Enhanced Entry” (1): The same comments apply as those in Concept A above.
2. “Softball Field (Existing)” (9): Some time last year or the year before the city put up a sign saying that the field is only for softball and neither baseball nor cricket ball is allowed. Until then, some people had played baseball occasionally and I felt danger as baseballs use very hard balls. I really appreciated the sign. There is one thing I felt sorry for, that is, those people that used to play cricket were also kicked out. They were using tennis balls instead of hard cricket balls.
Thus, I did not feel danger at all. I think cricket games using tennis balls are even less dangerous than softball games using soft balls.
3. “Picnic Area with Shade” (11): I suppose that you mean to cut down the size of the “Event Lawn” (7) from the north and south sides to make space for it. That would make the event lawn much smaller. It would not be as useful for “Event Lawn”. Big festivals such as Cherry blossom festival, Kids Fun festival, Indian festivals etc. used the lawn to host big attractions for kids to play. Kids attractions such as trampolines, train rides, inflated bounce houses were very popular. As it is, the lawn is flat, rectangular, and of good size. It would be useful and handy for big events in the future as it has been. Also, since it is located next to the parking lot and has electric outlets near by, the location is convenient to set up attraction equipments. Talking about proximity to the parking lot, the south part of the “Picnic Area with Shade” (11) would be too close to the parking lot. After all, Memorial park is best, among other Cupertino parks, for hosting big weekend events, especially because De Anza College parking lots are available on weekends.
Concept C:
1. “Enhanced Entry” (1): The same comments apply as those in Concept A above.
2. “Relocated/Expanded Amphitheater” (11): If you want to make the amphitheater bigger, you would not be able to hold performances on weekday evenings any more. The reason is parking. Even with the current location and size, the situation is chaotic. People are driving up and down on Alves and Anton looking desperately for available spots. The only possible solution would be to hold performances on weekends using De Anza College parking lots. If you make it too big and up to date, it may lose a casual and rustic atmosphere, which I think is one of the charms Thanks for reading through my long comment."
Table C-90: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-143
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
The space decisions should be based on utilization rates. For example, how many times and how many people use or will use the existing or proposed space.
Like is the amphitheater used more than a handful of times a year? How often are bocce ball courts used in the other parks? Does baseball/softball seasons make the space worth retaining or does the city have enough alternative sites?
I gave my preferences based on how my family would use it but there could be decisions made buy how spaces are currently used by the community.
Designing a larger amphitheater with the hope that more will use it is silly but if events are unable to occur then it should be heavily considered or a secondary site instead of moving it should be considered. " I like more nature as well as the art exhibits
We would love to spend more time in Cupertino on the weekends however we are missing a downtown vibe (and Main Street is not a downtown it is a strip mall). This park has the opportunity to be a city center where young families spend their time.
be mindful about budget
Very limited parking available for non senior center use. Loved the cherry blossom trees!! Space for youth to play soccer
More open fields
I like the spaciousness of the space. It would be great if the space remains free to use for anything after the renovations. "Please no more paving & cement. We need kids to be in nature. The paved playgrounds at the schools are enough for them to practice bike riding.
No more cemented areas in memorial park please!!! "
We love going to the park to attend fairs. Can they be more often? Water fountain, compost garden
" used to love the water feature, but I can see how that’s unsustainable in our weather. I really like the modernized designs for an event plaza, the upgraded amphitheater and the picnic spots. Very glad that something is being done about our favorite park. :)"
A basketball court will be great to have, we have non in the vicinity.
What happened to having a full basketball court (lighted)? I feel that this facility would be best utilized at all hours instead of certain hours for the other facilities
Add Basketball court and please do not move Softball field.
Basketball court
I like the bigger playground from concept A but would like to keep the softball field as my kid’s practice there all the time.
It would be nice for the park to be a draw for as many people as possible throughout the day to encourage community.
Softball fields, tennis, bocce - these all take a lot of room and serve a very small amount of people at one time. Space for groups - children, seniors - to be together in the outdoors would be a premium.
Table C-91: Round 2 Survey Question 14 Results (continued) -
C-144 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Shade for the audience in the any amphitheater would be very welcome.
Lightings for night time use
Cancha de futbol, mas juegos para niños
Minimize unwanted foot traffic.
The festivals make the neighborhood unpleasant.
Use DeAnza for commercial activities!
I chose the community focused one, but I love the idea of an interactive cultural exhibit, so I hope that stays in there.
Please add a outdoor fitness area (callisthenics)
Save the softball field
Please can you add a basket ball court as well.
Large ball fields are infrequently used, instead design the park for activities for other sports, basketball, volleyball, running track around the perimeter, etc..
So many tennis players are fighting for court time, please increase number of public courts. Please dont mix tennis with pickle ball, its a mess. Create separate pickle ball courts and we dont know for how many years people will keep playing it, it's a new sport. Dont disrupt tennis which has been there for decades I'm particularly interested in the festivals held at the park, I think they enhance our city's offerings and contribute to multicultural sharing of customs, culture, food and relationships between citizens. For me, over the years it has been a wonderful place for my now grown children to play on exceptional equipment, run freely with friends and enjoy sports on the expansive lawns. It is also a great place to walk and reflect, offering peace and quiet, as well as hold group picnics and BBQ's at the group areas for this.
There should be a small skateboard park for kids.
The closest one is north Sunnyvale.
Please consider adding special, nearby parking for families with small children and strollers.
If nothing then olease bring back the fountains
Please add dog park with natural grass. This is the only this park which has not included a Dog park. Lot of people own dogs more than before. They need a dog park desperately.
Walkability and bike connections are vital to any functioning park, and should be prioritized over parking or car mobility options. Additionally, public bathrooms are important to any public space. Finally I think the larger and enhanced theatre is important because there really isn't this kind of outdoor space in Cupertino today Please add a fenced in dog park with grass. Although there is one on Mary, it's gravel and non-community folks come there with untrained dogs.
Please add lots of cherry trees! I also like the ampitheater to remain where it is and be enhanced. keep BBQ pits, get rid of pond/lake, add summertime water feature for the kids to run through to keep cool, keep amphitheater in current location with upgrades
Table C-92: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-145
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
My family, including two young kids ages 5 and 3, primarily use the park for the recreational playgrounds. We live within walking distance so we often visit the park on weekends so the kids can play. I'd love to see the redesign focus on more expanded/upgraded playgrounds as mentioned in option A to replace the softball field which I rarely see in use. The other primary use I have for the park is to play tennis. The tennis courts are almost always in use when I go which requires time to wait until someone finishes so I'd love to see more dedicated tennis courts.
DEDICATED PICKLEBALL COURTS PLEASE
What a great opportunity here. I'm a big fan of the Pickleball courts. Also, more shade for walking, sitting, and picnics.
And I thought you might have an option to make the softball field also support cricket.
Dedicated Pickleball Courts needed!
Downtown Riverside has wonderful statues memorials dedicated to Mahatma Gandhi, Martin Luther King, Caesar Chavez and other great leaders, along with some of their most profound sayings. It would be nice to pay homage to our "spiritual" side as part of the park.
Either plan A or B with dedicated pickle ball courts will bring adult community to the park like basketball courts attracts teenagers. Pickleball is easy to play at various levels and more efficient in space use.
Please create dedicated pickleball courts for this growing sport that brings young and old together! I do not like the "commercialized" events with commerce-related booths MUST HAVE AT LEAST 6 DEDICATED TENNIS COURTS AND ZERO PICKLEBALL COURTS. IF DO ANY PICKLEBALL COURTS, THEN KEEP THEM AS FAR AWAY FROM THE TENNIS COURTS AS POSSIBLE. THE
SOUND OF A PICKLEBALL BEING STRUCK IS ONLY SLIGHTLY MORE PLEASANT THAN HEARING A NEIGHBOR KID SET OFF AN M80 AT 11:00 O'CLOCK AT NIGHT.
Dedicated pickleball courts preferred but if multi use tennis and pb courts please post priority and day/times Please put in some thought of how the new design to avoid turning into a homeless encampment..... so that the community feel safe to utilize the facility in the park since it is busy community activities area, I like a quieter park concept.
I doubt that exercise stations and tables for chess, checkers, etc would be used much. Keep baseball field and amphitheater in place to reduce costs. More areas for nature walks, gardens are desired as that is the major use of the park. I walk there every day and see many people doing the same so preserving it as a walking area is best.
Strict rules on dogs not to be unleached
Cuesta Park Mountain View is a good example of open space and nature focus, with ample playground, tennis courts, grass fields. Add visually appealing trees or art along Stevens Creek to make Memorial Park stand out I like the playground and events.
Can we have more availability in softball sports. The softball is always waitlisted. Can we have a bike track or bike lane for our kid’s to ride their bikes safely without disturbing the elderly Something for every age group will be great.
There are lot of Birds and squirrel, can we have a little water spot for them in summer when it gets hot & dry Table C-93: Round 2 Survey Question 14 Results (continued) -
C-146 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Excited to see the park revitalized, thank you for the hard work in planning this out. Please plant more cherry trees and colorful flowers (tulips, ranunculus, cosmos, nemophila, lavender etc) around the park. The park should be beautiful, especially during Spring like parks in our sister city in Japan. Don't make it look too industrial by sticking to green/ brown/steel colors only. See https://blog.japanwondertravel.com/best-flower-parks-in-japan-22510 I'm so happy the empty ponds are now more green usable area.
The current softball field is not well utilized and consumes a lot of space.
Needs more separate pickle ball courts
Dedicated pickelball courts, similar to other cities
Pickleball participation has exploded and is now a sport that various generations are actively playing. While it is not going to overtake Tennis, the barrier to entry to start playing pickleball is very low. As a result, it is very attractive and appealing to people that would otherwise never consider Tennis. I am confident that the city should reevaluate the quantity of pickleball courts and perhaps reduce the tennis court count by one so that you could increase the count of pickleball courts by as much as four. There is a social aspect to pickleball that is not common in Tennis. Pickleball is at its best when a location has multiple courts (not just 1-3 courts but 6-8 or more). Unlike tennis, a single game of pickleball may take 10-15 minutes and then people often circulate to play and socialize with different people. Please consider making Memorial Park a "Pickleball Location" that players will want to come to and spend time at your wonderful park socializing among the community. Thanks.
More parking closer to tennis/pickleball courts
please consider disabled adults in the playground upgrades - eg special needs swings etc Pickleball attendance some nights are 30+ twice a week. Next year it will be 60+ due to the fun and social aspect! Please add more pickleball lines and dedicated pickleball courts as other cities like San Jose and Palo Alto have 10+ dedicated courts with an exploding pickleball population which connects to communities! Thank you! We’ve lived in Cupertino for 27 years. My husband and I look forward to the park being remodeled. We used to love the water elements there years ago.
Please don’t remove softball park
Softball park is a must to have
Keep the gazebo!! It’s my absolute favorite thing and my highschool did senior pictures there.
We love attending events at Memorial Park and the convince of being able to park at Deanza Please keep the softball field. It is used by many people of all ages frequently - much more so than the playground or amphitheater. Plant trees beyond the fence area if there is concern of balls going over the fence.
All tennis courts should be striped for pickleball
It is the least cost effective to keep the softball field.
Pickleball courts
During the event, the residents nearby are deeply disturbed by illegal parking on “no parking” or “permit parking “ or park in front of fire hydrant, double parking. Followed by littering after the events. City of Cupertino is hosting events with the cost of interference on residents and trashing the park.
Table C-94: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-147
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Cupertino needs dedicated pickle ball courts
Nicer playground/structure would be nice
DEDICATED pickleball courts would be FANTASTIC!!! We (Cupertino resident for 20+yr) currently have to go to Sunnyvale for that.
Make at least 8 or more dedicated pickleball courts as it is a sport growing tremendously in popularity that is good for fitness and fun for boys and girls, men and women. In fact, 8 dedicated pickleball courts only take the space of 2 tennis courts! Tennis enthusiasts would still have the remaining existing tennis courts to play on. Both pickleballers and tennis players can coexist and support the community.
Pickleball paradise
These plans are all interesting and well thought out. Thank you! The softball field is important as there are few nice fields in Cupertino, beside MVRC. Really like the upgraded ampatheater.
Please add as many native plants, shrubs and trees as possible to restore the environment for native birds and insects.
Have you considered a Magical Bridge type playground? Our children would really benefit. I as an adult have also enjoyed those spaces.
I don't like the idea of extra parking but without adequate parking, fewer people can enjoy the revitalized Memorial Park without impacting the surrounding streets.
"I think the park needs more shade trees but not flowering cherry trees.
Non allergic trees that supply better shade. "
We need more tennis, pickleball courts, and fitness stations. No one wants more event centers and amphitheaters.
People want to be active and outside. We also need a lap swim pool...
All three designs are great.
thanks for inviting me to provide feedback. I like the third choice.
Please upgrade the seating terrace to allow people with different abilities to be able to go up / down.
Bike locks
I love the nature concepts and would love to see more of that! For those of us living close to memorial park, we look forward to the greenery with all the new construction in the viscosity. Building more buildings will deprive us of the greenery. Our whole family, including our dog, loves memorial park
Something lacking from all these plans is foresight and how this space will not only itself adapt and be resilient in the face of climate change, but how it will support this community as it faces the challenges of a rapidly changing climate.
Urban green spaces need to be multifunctional. And while all 3 of these plans provide some sort of social and ecological benefits, they do not go far enough. I did not see any of these plans specifically address stormwater management and was disappointed that there was no green stormwater infrastructure. In addition, while cherry trees are beautiful and hold cultural significance for many Cupertino community members, they are not native and therefore not as resilient or adaptable as native tree species such as Western Redbud, which too has beautiful pink blooms and provide ample shade from Their broad canopy. "
Table C-95: Round 2 Survey Question 14 Results (continued) -
C-148 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
The elements of the park should express nature and be composed of as much natural materials as possible.
Be sure to do a good job.
Use of QR code for cultural and /or exhibitions, with brief visual plates.
All concepts look amazing and I am excited about the plans that the city has for this park! Pickleball courts please . In desperate need of more pickleball courts! Thank you for continuing the upkeep of our beautiful city.
You need more pickleball courts.
I like the amphitheater the way it is. It kind of combines nature with the seating. The softball field seems well used by people (not myself so much), and would hate to see it go away. The current playground seems recently renovated and works well where it is. Event plaza and table games to encourage more people to connect in different ways seems ideal. While I love the idea of a garden walk, McClellan Ranch Park (and the Steven's Creek pathway) seem to have this concept well covered.
Need to control illegal parking in the neighborhood during event. The design should facilitate, direct, encourage, and enhance event visitors to park at DeAnza College.
You don't need additional parking, just advise event holders to instruct their guests about parking at De Anza, and retain a high priority on that pedestrian access
Please retain the softball field
Progressive, inclusive & thoughtful approach to redesigning Memorial Park. Kudos.
In general I believe a park should be inclusive, and provide the community with opportunities to recreate, gather, and socialize. I prefer Concept A for that reason: its theme is ""Community"". Really love the idea that people can find new friends by going to the park, so ping pong and chess tables really appealed. As do the pickleball courts, which is inherently social because it's mostly a doubles game. As well as the picnic areas with shade, and event/amphitheater spaces.
A note re pickleball: as the sport gain tremendous popularity very quickly (it went from 5M players to 36M in one year!) Memorial Park may see increased demand for court space. Staying flexible about sharing court time btwn tennis and pickleball play may be in the future regardless of which plan you adopt.
Also there is already a dearth of parking spaces, so thoughtful planning on how to expand parking options is critical." Thank you to the whole team that has been working to revitalize this wonderful community park that myself, my family, neighbors, and friends all love! The park has been a key hub for so many people of all ages to gather, make connections, and build community. I am a tennis and softball player and have recently found pickleball...and see that this sport has been all-inclusive for the Cupertino community. I strongly vote for Plan A to have dedicated Pickleball courts and to leave the Pickleball striping/lines & nets on tennis court 2 in the event that the tennis court is empty.
Thank you!
With 36 millions tree lost in CA last year, it is vital for every community to plant as many trees as possible, at the same time use innovative approach that will speed up urban planting and growth. Please consider Pocket Forest idea which has implemented at school sites in Berkeley and all over the world. Creating such forest is a great way to engage community members from all age and take ownership of the park, reduce cost. See links for additional info. https:// www.berkeleyside.org/2022/12/08/miyawaki-pocket-forests-berkeley-unified-school-district https://www.sugiproject.com/blog/the-miyawaki-method-for-creating-forests Table C-96: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-149
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
Please have dedicated pickleball courts, there is no shortage of dedicated tennis courts but with pickleball thats not the case.
Most public tennis courts are used for private coaching, where as pickleball courts have bigger turnout and used for recreational play by Seniors and youngsters which align with the social/community objectives.
Pickleball is the fastest growing sport and Bay area has the worst pickleball facilities in the entire country. ( No dedicated public indoor courts)
Besides being easier to learn than tennis, pickleball is also slower paced and there’s less ground to cover; you could almost fit four pickleball courts onto one tennis court, and most picklers play doubles. Some research suggests that it may be safer than tennis for people with heart issues, too.
In one of the few studies that’s been done on pickleball, researchers found that compared to walking at a self-selected pace for half an hour, people who played doubles pickleball for half an hour had 14 percent higher heart rates and burned 36 percent more calories. Another study from Western Colorado University found that picklers averaged a heart rate of 109 beats per minute and burned 354 calories per hour, which qualifies it as a moderate-intensity workout alongside hiking, yoga and water aerobics. The players also saw significant improvements in their cholesterol levels, blood pressure and maximal oxygen uptake, a measure of cardiovascular fitness, after playing for an hour every other day for six weeks.
Because the paddle’s so small, pickleball is great for hand-eye coordination as well as neuromuscular coordination,” said Heather Milton, a clinical exercise physiologist at the Sports Performance Center at NYU Langone Health. “You’re moving in different planes, not just forward like you do when you’re walking or cycling, which is good for your agility.
And because there’s rotation involved, you’re working your core along with your upper and lower extremities.”
Less than a quarter of U.S. adults get enough physical activity, and that percentage decreases with age. One of the main barriers to exercising is a lack of social interaction, a big source of motivation.
But while 50 percent of people quit exercising six months after starting, research shows that picklers keep coming back to the court again and again, primarily because the game is so social. Pickleball can also improve your well-being:
According to another study of picklers age 50 and older, those who were more serious about the sport tended to be more satisfied with their lives. The same researchers found an inverse relationship between “serious leisure” — in this case, playing pickleball competitively — and levels of depression. please make sure to keep the softball fields as they are an integral part of the community park Some kind of water feature would be very welcome.
Also must have rules for dogs on leash because many people at various Cupertino parks do not follow dog leash rules. " Green with focus on nature will be good
The park needs to be a place of nature and beauty, somewhere you want to spend time walking in and bringing your children and grandchildren with open ended play experiences. There is plenty of public art, tennis courts and softball fields so I would prefer to keep this open and natural as it is a unique space and at the heart of the city.
Table C-97: Round 2 Survey Question 14 Results (continued) -
C-150 Memorial Park Specific Plan
Round 2 Survey Question 14: Anything else you’d like to share about revitalizing Memorial Park? Write-in Responses [continued]
I’m a scoutmaster and look for spaces to engage teen groups in the outdoors. Spaces that accommodate groups, seating and tables, located near lawns are great for teaching and games with groups of scouts. Places to have a campfire program are great too. I’m a big fan of having nature and teaching kids about plants. We need areas that don’t cost money in which to be outdoors.
A dedicated pickelball courts
I wish you had not destroyed the Oaks Center. The new high-rise buildings look horrible and indicate what's coming once the "Westport Cupertino" is completed. I can't believe how someone could come up with such a plan. Please don't destroy Memorial Park.
My kids love the playground and climbers, please do not take it down; they love the natural amphitheater seats and running up and down them; we wish they could add exercise equipment Safety from crime important
I’ve been playing softball at Memorial Park for 12 years. It’s an important activity that I share with many quality players.
It’s good mentally and physically for all of us.
Best Mix and match: Concept A but with 4 pickleball Courts , drop-off and parking from b or C, instead of game tables have a separate enclosed playground for preschoolers and volleyball sand ct ,add some of nature garden to garden walk,
There needs to be more of a focus on nature and less on people. We know from experience that people mess up things and therefore need less "human-friendly" designs for parks. People have more than enough places to gather.
Skate and Bicycle Park
Can you build a fenced dog park? Thank you!
More fun place for children, currently the facilities are out of date.
Table C-98: Round 2 Survey Question 14 Results (continued) -
Appendix C Community Engagement Data C-151
Round 2
Open House Photos
February 4, 2023
revit01i1 e
Memorial Park Concept A: COMMUNITY FOCUS
PARK ELEMENTS
-
Concept : COMMUNITY FOCUS
C-152 Memorial Park Specific Plan
Round 2 Open House: Overview of Responses per Board
Boards Responses
Most Important Elements (Board)* 168
Concept Choice** 50
Reason for Concept Choice (Board)*** 31
* Participants received 3 dots for this board
** Participants received 1 token for Concept Choice
*** Participants received 1 dot for this board
Total 249
Table C-99: Round 2 Open House Results
Participants received 3 dots for this board
Participants received 1 token
Participants received 1 dot for this board
Round 2
Open House Results
February 4, 2023
Figure C-86: Round 2 Open House Results - Overview
-
R2 Open House, Overview of Responses per Board:
Most Important Elements (Board)*
Concept Choice**
Reason for Concept Choice (Board)***
0 20 40 60 80 100 120 140 160 180
Appendix C Community Engagement Data C-153
Round 2 Open House, Most Important Elements: What do you think is the MOST IMPORTANT to include in the final design? Pick THREE of the options below.
Answer Options Responses
Enhanced Entry 2
Event Plaza 1
Event Lawn 1
Relocated/Upgraded Restrooms 7
Upgraded Amphitheater 8
Relocated/Expanded Amphitheater 7
Passive Garden Walk 2
Educational Garden Zone 1
Group Picnic Area with Shade 6
Picnic Area with Shade 8
Upgraded Playground 14
Relocated/Expanded Playground 7
Nature Playground 2
Fitness Stations 1
Bike Traffic Garden 9
Bocce Ball Courts 7
Table Games 4
Senior Center Deck as Component of Entry Plaza 6
Interactive Cultural Exhibit Area 0
Softball Field (existing) 0
Dual-Use Tennis and Pickleball Courts 3
Dedicated Tennis Courts 7
Dedicated Pickleball Courts 10
Quinlan Courtyard as Event Space 4
Quinlan Courtyard with Seating 6
Quinlan Courtyard as Plaza 0
Expanded Multi-Use Path Network 6
Bike Connections to City-Wide Network 4
Additional Parking 11
Table C-100: Round 2 Open House Results - Most Important Elements -
C-154 Memorial Park Specific Plan
Round 2 Open House, Most Important Elements: What do you think is the MOST IMPORTANT to include in the final design? Pick THREE of the options below. (continued) Answer Options Responses
Drop-Off Area 3
Additional Cherry Trees 7
Additional Trees 8
Additional Planting Areas 2
Trees (existing) 3
Other 1
Total 168
Table C-101: Round 2 Open House Results - Most Important Elements (continued) -
Appendix C Community Engagement Data C-155
Figure C-87: Round 2 Open House Results - Most Important Elements R2 Open House, Most Important Elements:
What do you think is the MOST IMPORTANT to include in the final design? (Pick THREE of the options below)
Enhanced Entry
Event Plaza
-Event Lawn
-Relocated/Upgraded Restrooms
Upgraded Amphitheater
Relocated/Expanded Amphitheater
Passive Garden Walk
Educational Garden Zone
-Group Picnic Area with Shade
Picnic Area with Shade
Upgraded Playground
Relocated/Expanded Playground
Nature Playground
Fitness Stations
-Bike Traffic Garden
Bocce Ball Courts
Table Games
Senior Center Deck as Component of Entry Plaza
Interactive Cultural Exhibit Area
Softball Field (existing)
Dual-Use Tennis and Pickleball Courts
Dedicated Tennis Courts
Dedicated Pickleball Courts
Quinlan Courtyard as Event Space
Quinlan Courtyard with Seating
Quinlan Courtyard as Plaza
Expanded Multi-Use Path Network
Bike Connections to City-Wide Network
Additional Parking
Drop-Off Area
Additional Cherry Trees
Additional Trees
Additional Planting Areas
Trees (existing)
Other
-0 2 4 6 8 10 12
-
14 C-156 Memorial Park Specific Plan
Round 2 Open House, Concept Choice: Which of these scenarios best describes Memorial Park as you would like emphasized in the future?
Answer Options Responses
Concept A: Community Focus 25
Concept B: Nature Focus 9
Concept C: Civic Focus 16
Total 50
Table C-102: Round 2 Open House Results - Concept Choice Figure C-88: Round 2 Open House Results - Concept Choice -
R2 Open House, Concept Choice:
Which of these scenarios best describes Memorial Park as you would like emphasized in the future?
Concept A: Community Focus
Concept B: Nature Focus
Concept C: Civic Focus
0 5 10 15 20 25
Appendix C Community Engagement Data C-157
Round 2 Open House, Reason for Choice: What do you LIKE MOST about your preferred concept? Pick ONE of the options below.
Answer Options Responses
It has the recreation amenities I like. 0
It has play spaces & experiences I like. 1
It has recreation opportunities for all ages. 1
It has recreation elements the community needs. 9
It has the nature experience I'm interested in. 2
It offers a desirable place to hang out and have fun. 1 It is bike-friendly. 3
It makes the park and its amenities easy to access. 0
It facilitates large festivals & events. 1
It represents the unique character of Cupertino. 0
It has amenities appealing to seniors. 2
It creates opportunities for social gatherings and community activities. 2 It has the best green space/open space features. 6
I don't like any of the concept features. 0
I like all three concepts and features a little bit. 3
Total 31
Table C-103: Round 2 Open House Results - Reason for Choice -
C-158 Memorial Park Specific Plan
Figure C-89: Round 2 Open House Results - Reason for Choice -
R2 Open House, Reason for Choice:
What do you LIKE MOST about your preferred concept?
(Pick ONE of the options below)
It has the recreation amenities I like. o
It has play spaces & experiences I like. -
It has recreation opportunities for all ages. -
It has recreation elements the community needs.
It has the nature experience I'm interested in.
It offers a desirable place to hang out and have fun. - It is bike-friendly.
It makes the park and its amenities easy to access. o
It facilitates large festivals & events. -
It represents the unique character of Cupertino. o
It has amenities appealing to seniors.
It creates opportunities for social gatherings and community ...
It has the best green space/open space features.
I don't like any of the concept features. o
I like all three concepts and features a little bit.
0 1 2 3 4 5 6 7 8 9
Appendix C Community Engagement Data C-159
Round 2 Open House: Comments on Concept A: Community Focus Write-in Responses
Safety with cars/paths
Love pickleball courts and dedicated lines on a tennis court too! Applies to all 3 plans: Main entry point - there should be one at Alves Dr and Anton Way. Many people enter here! Please keep lawn area above and around concrete of amphitheater. Many of us prefer being on the lawn.
Separate kids & adults
Add as much parking as possible
Parks and recreation needs to include more recreation, so things like pickleball, tennis, bocce ball and table games are lacking to date and need more emphasis.
Keep amphitheater in original location, update & enlarge if possible.
Dedicated pickleball good. Also keep dual striping.
Bike path for kids. My husband and a friend was hit by kids racing their bikes.
I like the idea of designated pickleball court. Multi age play area is way too busy. I'd prefer open space.
Bike/ped/civic. Kids circulation safety not safe for so many ages using that space. Please just let walkers be safe.
Greater connection from Senior Center and N. Development. Activate Senior edge connections.
Keep softball field. Would like to disperse some of the multi-age "games" throughout the park near pathways.
Bike traffic garden will take too much of the area. The plan shows narrow path but actual picture shows huge wide lanes. Play area - too much concrete.
Please take out the softball field. I like it used for family and community activities.
I like the (16) Quinlan event space. Need shaded picnic areas. Like paved event area. Not sure about group picnic area.
Lawn event areas not inviting to me.
How about playground & picnic area & lawn all at top of the park far from Stevens Creek and all about kids & family playground and the bocce, cheese table games near senior area! Need to provide expansion of Senior Center. Room for deck, outdoor classes, i.e. yoga, tai chi, etc.
Parking ADA close to amphitheater
Multi-age play area is too big & has no trees. Right now, we have 2 intimate playground spaces that are charming and natural. This space is neither.
Love the dedicated pickleball courts. Bike lanes. Like the existing playground & amphitheater.
Concept A: More "serenity" i.e. multi-play area more trees and planting areas Blended concept with Concept A + Concept B + Concept C to meet many people's needs. Memorial park does not have to be identity focused. Nature identity park: Blackberry Farm, McClellan Ranch, Linda Vista Park. The least amount of interest softball field becomes to the multi age play area. Make the playground bigger and all inclusiving playground for children for all ages and abilities. No Bocce Ball court. Reduce table games area. Move Dedicated Pickleball the Concept A to away from play area. Pickleball is very high pitch loud noise. The new field after removing the pond is nature area with Nature Playground. Ugraded amphitheater included wheel chair seating area. Stay amphitheather as it is now. Deliver truck park on Alton for load/unload equipments or music instruments, or enter from wide truck entrance during performance and concert. Safe soft rubber ground in the playground, not lawn or wood bark.
Table C-104: Round 2 Open House Results - Concept A Comments -
C-160 Memorial Park Specific Plan
Round 2 Open House: Comments on Concept B: Nature Focus Write-in Responses
Not enough festival space. Not enough group classes space.
More walking paths to gain access to the Senior Center.
Nature playground would occupy kids for about 10 minutes. Then - Boring! Image of enhanced entrance is not appropriate for this park - no metal modern elements please.
Don't keep the baseball field.
Nature playground is good depending on design, space it takes up, should include something for all ages & abilities.
I like to passive garden walk & nature playground concepts. Would prefer to see ball field changed to park area. There are other ball fields at schools the city administers.
Educational gardes are way overrated. Not needed, underutilized, and space can be used much better. Do not support educational garden.
Walking paths don't flow through the park. Seems broken up into straight paths then small windy paths.
Move drop off area way from Anton & Alves intersection. This is a major pedestrian entry point.
Yes - keep softball field. Dual purpose with DOLA makes sooo much sense.
Already have plenty of nature space. McClellan Park - open space, Linda Vista Park The nature playground in this proposal would not be good for small children & toddlers.
Keep the ball field. I love the open fields and would not like that area with all the business of the community focus plan.
I don't think we need an educational garden zone. McClellan Ranch does a lot of education.
Dumb that play area is not near either picnic area. Much better for families if kids can play within sight of where family has picnic.
1) Like Bike Traffic Garden - need. 2) Additional parking. 3) Pickleball is loud. Maybe better to relocate so neighborrs don't protest. 4) Encourage walking & safety a la Tunnel Top Park, SF We have educational gardens at other parks that make sense where they area. We don't need one junking up Memorial Park.
McClellan Ranch meets many of these educational elements.
Connect the Senior Center more to the park - better paths, etc. to draw seniors into park. Maybe a senior exercise area? Senior exercise area would be good - but social activities more important.
Pickleball designed whicever way current pickleball players prefer Like the tennis & pickleball arrangement of this plan best. Not really interested in educational garden.
Biggest negative on B is keeping the softball - just a lot of land to serve few events/people. Been here 26 years & it's rarely used. Love the natural ideas.
Less garden, more recreation. Remove "canyon of doom." Make "nature" play practical. Fence off Steven's Creek or playground.
Table C-105: Round 2 Open House Results - Concept B Comments -
Appendix C Community Engagement Data C-161
Round 2 Open House: Comments on Concept C: Civic Focus
Write-in Responses
Need parking NEAR amphitheater for accessible, senior population. Benches with arms, not too low.
More shade trees, less cherry trees. Parking area at intersection of Alves & Anton is SUPER DANGEROUS - will cause accidents.
Enhanced entries are ugly & a waste, other than making them accessible.
If you move the amphitheather, need to consider noise to neighbors at commons. More trees, less structures.
Shade trees: Plant now for future.
More picnic areas.
Improve access from Senior Center to outdoor areas - larger deck.
Expand drop-off at (2). More parking. Less cherry trees.
Enlarge Senior Center outdoor space & deck for clases & community activities.
Event plaza seems it would be hot-hot-hot in summer.
Exercise area more important that a cultural exhibit area. (13) Quinlan Courtyard, why not make it like A? I'd like to see the Senior Center readily integrated into park or more accessible.
Move drop-off area away from intersection of Anton & Alves. This is a major pedestrian entry point.
More picnic areas by play structure, at front of park and elsewhere.
Like #2 to improve entry to Senior Center. Activate Senior Center front & street side No interactive cultural exhibit area. Not needed - want park.
Access/intentional transition from Senior Center and consideration of weekday use of Event Lawn by Senior Center in design.
Like conversion of baseball field to larger/enhanced amphitheather for performing arts.
Marina Project has cultural area - art & community group room This doesn't seem to have "something for all ages." It's too much "event" stuff and not enough everyday "just go to the park and play."
No drop-off. Keep Alves/Anton corner (Concept A)
Combine expanded amphitheater with educational areas.
Get as much parking as possible.
Add trees to areas without shade - or shade stuff.
Please have 2 playgrounds.
Don't make amphitheater bigger. Provide areas for listsening on the lawn. Less concrete.
Historical display okay if small. Includie it in modest enhanced entrance instead of something separate.
See cultural exhibit in Marina building
I really like the enlarged amphitheater. The event plaza ought to be conducive to events. In past, events on parking lot pavement were good (food & drinks), booths on grass not good.
Table C-106: Round 2 Open House Results - Concept C Comments -
C-162 Memorial Park Specific Plan
Round 2
Open House Boards
February 4, 2023
Figure C-90: Open House Dot Boards
-
D 1:nhor,c:Od Enhy
•
•
D IE'-"'Ord Lown •
a Upgrod od AmphJthaolM
•••••••
D Roloc;alad / bpan:;;d::.,,,i-- ~~=aaa;~
An,pt,lllutaler
• •• IJ Pe. u r,,,e Garden Walk
••
1511 * tftuca tlonal Go,don Zone
DI
•• •
What do you think is MOSr IMIIOHANT to include in the final design? Upgraded Playground
•••• . ~·: ••
Relocaled / Exponded
Plovg1ovnd •
••••
Nolure Playground
fable Gomes
{p(lg,tX1119,c-J"9'UJ
•
(El Senk>r Center Deck 01
c:omp0 r11:11 nt of Entry Plaza
•• •
Pick THREE of the options below.
[E lnl1Nocttve Culiurot
Exhibit A(ea
tl!} 5-0ftboll Plek::I (exl:d[ng)
2)] Duat-u&e Tennis and
Pie li;h:11b0II Cou rb
• m Oedlcated Jenn l1 Courh
••••• • EE Ded]cgfod Pk: klebalt
c . .. . . .
• •• • • EI:] Quln1¢n CourtyCKd as
f.vent Space •
•••
El} Quln lon Couttynrd with
•";• ...
~ Qulnlan Courtyard as.
Plaza
ffi' l!xpanded Multl -Use Poth
Nelwo,-k •
•• •
EE) Bike Connection!!; to
Clly -widv Network
• • •
ra AddlHonol Tr•e-s
• ••••
• ••
•
CUPE!lltTINO
Appendix C Community Engagement Data C-163
Figure C-94: Open House Dot Boards
Figure C-91: Open House Comment Boards
Figure C-92: Open House Comment Boards
Figure C-93: Open House Comment Boards
What do you LIKE MOST about
your preferred concept?
Pick JI He of the options below.
D II hat ,ec,oollo n ornenffies I llke. fl ff facllftates bge fMtlvo l~ I •vonl's., • fl 11 hot. ploy ,-pce.s. &. e;ii;perience1 I Ilk-;- IE 11 repre11Pnb the unique chOroet.r of CuplHfino.
D If has o:icrootlon oppartvr,f e1 for cill
oges and obillJi" . •
EJ It ha1 re,e,ooltOn elements th
community neech. •
IIJ It ha1 omenffles appealing to MniOrl .
•
[E ll c1..a1'e1 oppoftunfflof!1 lcw 1oclot
!iJOttHl,lngs, and cornmunfty 0<:llv11J•1 .
• •• • • • ••
D It hos the notu,e e11;perlenic1t I'm
lnteriMtealn,
• • II 11 oNen de-lifoblt pious lo hang out
ondhovehm
•
Q It Is bil:e-&iendly .
• • •
[!I I don 'l lk.e any a, !he cone~
IE I llke OIi three- concept,. and features a
llttleblt .
••
l!J It MClktJ Jhe pork and lb ame nities easy
toacee-ss..
OTHER:
Write your comments on a sticky note and place them below .~ - ... ~-._..__,.
!t,.'":,~
-
CON TA.
COMMUNITY FOCUS
Write your comments on a sticky note and place them below II
'New to artromytN/1 111 , n,'1 VI
https://~ngagecup&rflno.com/mem01lal•park-1peciftc-plon CONC C:
CIVIC FOCUS
Write your comments on a sticky note and place them below Ii
We WGnl lo he tram youl e
https://engogecupertino.com / memoriol•pork•5peciflc•plan C-164 Memorial Park Specific Plan
Round 2 Webinar Question: Which park concept is your preferred for revitalizing Memorial Park? Answer Options All Responses
Concept A: Community Focus (Community Gathering) 9
Concept B: Nature Focus (Natural Park) 4
Concept C: Civic Focus (Civic Events) 3
TOTAL 16
Table C-107: Round 2 Webinar Question Results
Round 2
Webinar Question Results
February 9, 2023
Figure C-95: Round 2 Webinar Question Results
-
R2 Webinar Question:
Which park concept is your preferred for revitalizing Memorial Park? Concept A: Community Focus {Community Gathering)
Concept B: Nature Focus {Natura l Park)
Concept C: Civic Focus {Civic Events)
0 1 2 3 4 5 6 7 8 9
Memorial Park Specific Plan D-1
Preliminary Concepts
Appendix D
-
This Page
Intentionally
Left Blank
Appendix D Preliminary Concepts D-3
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
SITE PLAN
1 Enhanced Entry
2 Event Lawn
3 Event Plaza
4 Relocated/Upgraded Restrooms
5 Upgraded Amphitheater
6 Passive Garden Walk
7 Picnic Area with Shade
8 Group Picnic Area with Shade
9 Relocated/Expanded Playground
10 Bike Traffic Garden
11 Fitness Stations
12 Table Games (e.g., chess, ping pong)
13 Bocce Ball Court
14 Dedicated Pickleball Courts
15 Dedicated Tennis Courts
16 Quinlan Courtyard as Event Space
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
Anton Way
16 15
1 1
1 1
1 1
9 10
12 11
12 13
14 7
8 5
4 4
3 6
2 2
0 50’ 100’ 200’ Figure D-1: Preliminary Concept A - Community Focus
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
-+-+
c:::::::::i
111111
I
D-4 Memorial Park Specific Plan
0 50’ 100’ 200’ 9 14
1312
10 11
11 8
7 7
4 4
2 3
1 1
1 1
6 5
SITE PLAN
1 Enhanced Entry
2 Educational Garden Zone
3 Nature Playground
4 Relocated/Upgraded Restrooms
5 Upgraded Amphitheater
6 Event Plaza
7 Event Lawn
8 Passive Garden Walk
9 Softball Field (Existing)
10 Group Picnic Area with Shade
11 Picnic Area with Shade
12 Dedicated Tennis Courts
13 Dedicated Pickleball Courts
14 Quinlan Courtyard with Seating
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
Anton Way
Figure D-2: Preliminary Concept B - Nature Focus
@ ~
0 0
0 0
0 0
0 0
0 0
0 0
0 0
c::::::J
111111
~
I
Appendix D Preliminary Concepts D-5
5 3
4 7
1 1
5 6
Stevens Creek Boulevard
Mary Avenue
Christensen Drive
North Stelling Road
Alves Drive
Anton Way
SITE PLAN
1 Enhanced Entry
2 Senior Center Deck as component of
Entry Plaza
3 Event Lawn
4 Picnic Area with Shade
5 Relocated/Upgraded Restrooms
6 Interactive Cultural Exhibit Area
7 Event Plaza
8 Passive Garden Walk
9 Group Picnic Area with Shade
10 Upgraded Playground
11 Relocated/Expanded Amphitheater
12 Dual-Use Tennis and Pickleball Courts
13 Quinlan Courtyard as Plaza
Expanded Multi-Use Path Network
Bike Connections to City-wide Network
Additional Parking
Drop-Off Area
Additional Trees
Additional Cherry Trees
Additional Planting Areas
Trees (Existing)
3 1
11 13
12 9
18 10
1 2
0 50’ 100’ 200’ Figure D-3: Preliminary Concept C - Civic Focus
· o
0 0
0 0
0 0
0 0
0 0
0 0
c::::::J
111111
I
This Page
Intentionally
Left Blank
Memorial Park Specific Plan E-1
Phase 1 Environmental Site
Assessment
Appendix E
-
This Page
Intentionally
Left Blank
Appendix E Phase 1 Environmental Site Assessment E-3
Ii!
CORNERSTONE
EARTH GROUP
TYPE OF SERVICES Phase I Environmental Site Assessment
LOCATION Cupertino Memorial Park, 10185 North Stelling Road and 21251 Stevens Creek Boulevard
Cupertino, California
CLIENT David J. Powers & Associates
PROJECTNUMBER 118-139-1
DATE October 13, 2022
-
E-4 Memorial Park Specific Plan
-
151
CORNERSTONE
EARTH GROUP
Type of Services Phase I Environmental Site Assessment
Location Cupertino Memorial Park, 10185 North Stelling Road and 21251 Stevens Creek Boulevard
Cupertino, California
Client David J. Powers & Associates
Client Address 1871 The Alameda, Suite 200
San Jose, California 95126
Project Number 118-139-1
Date October 13, 2022
Prepared by Ron L. Helm, C.E.G.
Senior Principal Geologist
1259 Oakmead Parkwa~ I Sunnyvale, CA 94085
T 4082454600 I F £082454620
1220 Oakland Boulevard, Suite 220 I Walnut Creek, CA 94596 r 925 988 9500 I F 925 988 9501
www.cornerstoncearth.com ■
Appendix E Phase 1 Environmental Site Assessment E-5
C"I CORNERSTONE
C : EARTI-I GROUP
Table of Contents
SECTION 1: INTRODUCTION ........................................................................................ 1
1.1 PURPOSE ............................................................................................................. 1
1.2 SCOPE OF WORK ................................................................................................ 2
1.3 ASSUMPTIONS .................................................................................................... 2
1.4 ENVIRONMENTAL PROFESSIONAL .................................................................. 2 SECTION 2: SITE DESCRIPTION ....................................................................... ........... 3
2.1 LOCATION AND OWNERSHIP ............................................................................ 3
2.2 CURRENT/PROPOSED USE OF THE SITE ......................................................... 3
2.3 SITE SETTING AND ADJOINING PROPERTY USE ............................................ 3 SECTION 3: USER PROVIDED INFORMATION ............................................................ 3
3.1 ENVIRONMENTAL LIENS OR ACTIVITY AND USE LIMITATIONS .................... 4
3.2 SPECIALIZED KNOWLEDGE AND COMMONLY KNOWN OR REASONABLY ASCERTAINABLE INFORMATION ............................................................................ 4 SECTION 4: RECORDS REVIEW .................................................................................. 4
4.1 STANDARD ENVIRONMENTAL RECORD SOURCES ........................................ 4
4.1.1 On-Site Database Listings ............................................................................ 5
4.1.2 Adjoining Property Database Listings and Nearby Spill Incidents ........... 5
4.2 ADDITIONAL ENVIRONMENTAL RECORD SOURCES ...................................... 5
4.2.1 City and County Agency File Review .......................................................... 5
4.2.2 Geologic Energy Management Division Maps ............................................ 6 SECTION 5: PHYSICAL SETTING ................................................................................. 6
5.1 RECENT USGS TOPOGRAPHIC MAP ................................................................ 6
5.2 HYDROGEOLOGY ............................................................................................... 6 SECTION 6: HISTORICAL USE INFORMATION ........................................................... 6
6.1 HISTORICAL SUMMARY .................................................................... ................. 6
6.1.1 City Directory Review ................................................................................... 8 SECTION 7: SITE RECONNAISSANCE ......................................................................... 8
7.1 METHODOLOGY AND LIMITING CONDITIONS .................................................. 8
7.2 OBSERVATIONS .................................................................................................. 9 7 .2.1 Site Photographs ........................................................................................ 10 SECTION 8: ENVIRONMENTAL QUESTIONNAIRE AND INTERVIEWS .................... 12
8.1 ENVIRONMENTAL QUESTIONNAIRE/ CURRENT OWNER AND OCCUPANT INTERVIEW .............................................................................................................. 12
8.2 INTERVIEWS WITH PREVIOUS OWNERS AND OCCUPANTS ........................ 12
8.3 INTERVIEWS WITH STATE AND/OR LOCAL GOVERNMENT OFFICIALS ...... 12 SECTION 9: FINDINGS, OPINIONS, AND CONCLUSIONS (WITH
RECOMMENDATIONS) ................................................................................................ 13
9.1 HISTORICAL SITE USAGE ................................................................................ 13
9.2 CHEMICAL STORAGE AND USE ...................................................................... 13
9.3 AGRICULTURAL USE ........................................................................................ 13
9.4 LEAD-BASED PAINT AND TERMITE CONTROL PESTICIDES ........................ 13
9.5 ASBESTOS CONTAINING BUILDING MATERIALS (ACBMS) ......................... 14
9.6 IMPORTED SOIL ................................................................................................ 14
9.7 POTENTIAL ENVIRONMENTAL CONCERNS WITHIN THE SITE VICINITY ..... 14
9.8 DATA GAPS ....................................................................................................... 14
9.9 DATA FAILURES ............................................................................................... 14
9.10 RECOGNIZED ENVIRONMENTAL CONDITIONS ............................................ 15 Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
-
Page i
E-6 Memorial Park Specific Plan
Appendix A - Database Search Report
omitted from published Site Assessment
and Outreach Summary Appendix
-
Is!
CORNERSTONE
EARTI-I GROUP
SECTION 10: LIMITATIONS ........................................................................................ 15
10.1 REPORT VIABILITY ......................................................................................... 16 FIGURE 1 - VICINITY MAP
FIGURE 2 - SITE PLAN
APPENDIX A- DATABASE SEARCH REPORT
APPENDIX B - HISTORIC AERIAL PHOTOGRAPHS AND MAPS
APPENDIX C - LOCAL STREET DIRECTORY SEARCH RES UL TS
APPENDIX D - QUESTIONNAIRE
Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard, Cupertino, California
118-139-1
Page ii
Appendix E Phase 1 Environmental Site Assessment E-7
Is!
CORNERSTONE
EARTH GROUP
Type of Services
Location
SECTION 1: INTRODUCTION
Phase I Environmental Site Assessment
Cupertino Memorial Park, 10185 North Stelling Road
and 21251 Stevens Creek Boulevard
Cupertino, California
This report presents the results of the Phase I Environmental Site Assessment (ESA) performed at Cupertino Memorial Park, 10185 North Stelling Road and 21251 Stevens Creek Boulevard in Cupertino, California (Site) as shown on Figures 1 and 2. This work was performed for David J.
Powers & Associates in accordance with our August 19, 2022 agreement (Agreement).
1.1 PURPOSE
The scope of work presented in the Agreement was prepared in general accordance with ASTM E1527-21 titled, "Standard Practice for Environmental Site Assessments : Phase I Environmental Site Assessment Process" (ASTM Standard). The ASTM Standard is in general compliance with the Environmental Protection Agency (EPA) rule titled, "Standards and Practices for All Appropriate Inquiries; Final Rule" (Ml Rule, 40 CFR Part 312). The purpose of this Phase I ESA is to strive to identify, to the extent feasible pursuant to the scope of work presented in the Agreement, Recognized Environmental Conditions at the Site.
As defined by ASTM E1527-21, the term Recognized Environmental Condition means 1) the presence of hazardous substances or petroleum products in, on, or at the subject property due to a release to the environment ; 2) the likely presence of hazardous substances or petroleum products in, on, or at the subject property due to a release or likely release to the environment ; or 3) the presence of hazardous substances or petroleum products in, on, or at the subject property under conditions that pose a material threat of a future release to the environment. A de minim is condition 1 is not a recognized environmental condition.
Cornerstone Earth Group, Inc . (Cornerstone) understands that David J. Powers & Associates is providing California Environmental Quality Act (CEQA) support associated with preparation of the Memorial Park Specific Plan. We performed this Phase I ESA to support David J. Powers & Associates in evaluation of Recognized Environmental Conditions at the Site. This Phase I ESA is intended to reduce, but not eliminate, uncertainty regarding the potential for Recognized Environmental Conditions at the Site.
1 A de minimis condition is defined by the ASTM Standard as a condition related to a release that generally does not present a threat to human health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies .
Cupertino Memorial Park, 10185 North Stelling Road and
21251 Stevens Creek Boulevard , Cupertino, California
118-139-1