aA cohesive team that looks at the big picture. Our proposed team has worked together delivering successful projects for public agencies. This unified force enables streamlined processes and smooth coordination. We have assembled a comprehensive team that offers complete support to meet the City's expectations at each phase of this assignment. These team members are experienced and cost-conscious, knowledgeable of codes and standards, comply with the rules, and are skilled at interfacing with surrounding communities. aHLCM, teamed exclusively with Ardurra for this project, has tremendous experience with cost estimating services that will be of great value to the City in establishing construction budgets that are accurate and take into account the ever-changing landscape of construction costs.

Ardurra has worked extensively with HLCM on past projects with similar services. aGeo-Advantec, Inc. (GAI) will provide experts to perform geotechnical and material testing and prepare required reports for grading and compaction. Ardurra and GAI have partnered on several projects, and GAI continues to provide outstanding geotechnical engineering, material testing, and inspection services for all phases of projects. aHighly effective construction management tools and procedures developed by construction managers. These tools are scalable and already tailored to fit the City of Cypress’s capital project delivery approach.

Please feel free to contact me at [email protected] or (714) 458-0703, should you have any questions or require additional information. We look forward to teaming with the City and assisting with delivery of this important park improvement project.

Respectfully submitted,
Ardurra Group, Inc.

Lisa M. Penna, PE, F.ASCE, QSD Dino P. D’Emilia, PE, F.ASCE, QSD Vice President, Regional Client Manager Project and Construction Management Group Leader Cell: 949.922.2800 Cell: 714.458.0703
[email protected] [email protected]
[ 3 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

FIRM PROFILE

LOCAL EXPERTS WITH NATIONAL STRENGTH
With 800+employees in 44 offices across the country,
including 120 professionals in 6 offices throughout
Southern California, Ardurra specializes in multidisciplined engineering and consulting services and is ranked 23 in Engineering News-Record’s Top 500. We focus on seven key service areas including: public works/civil planning, design and construction management, water/wastewater planning
design and construction management, environmental,
land development, emergency management, structural
engineering, and survey.

Locally, Ardurra’s team of professionals provides construction oversight and inspection, program management, project management, construction management and administration, civil engineering planning and design, plan review and plan check, code compliance enforcement, environmental compliance, labor compliance, and grant administration.

Since 2005, more than 60 municipalities throughout Southern California have entrusted Ardurra with their construction management and inspection needs. With an emphasis on practical, experienced, and cost-effective solutions, Ardurra offers capabilities ranging from local agency public works improvements to major transportation, infrastructure, and vertical building projects, as well as managing multi-project capital improvement programs.

Ardurra’s construction personnel are well-versed in CPM scheduling, construction means and methods, WATCH requirements, and Greenbook General Specifications and are adept at maintaining a safe construction site while achieving quality projects on time and within budget.

Ardurra has a comprehensive bench of inspectors who bring experience in all aspects of public agency inspection. Ardurra’s inspectors are competent, knowledgeable and conform to California Building Standards Code/Title 24, city codes and ordinances, federal grant requirements, State Water Resources Control Board requirements, State of California Local Assistance Procedures Manual, Greenbook, AWWA and APWA standards, and, where appropriate, LEED, DSA, and OSHPD standards.

RESPONSIVENESS – WE ARE THERE WHEN YOU NEED US!
With six offices throughout Southern California, the Ardurra team provides unparalleled responsiveness to the City of Cypress. Our offices are full-time service offices and will be for the entire duration of the contract. Close geographic proximity to the City makes us ideally suited to serve the City and ensures availability for City meetings at City facilities and in the field as needed. Our Public Works Division's main office is in Newport Beach—just 17 miles from the City of Cypress's office and 18 miles to Arnold Cypress Park.

SECTION 1: FIRM ORGANIZATION,

CREDENTIALS, BACKGROUND
Ardurra offers the City of Cypress a comprehensive team capable of providing complete support through each phase of the project—from participation in the design process to preconstruction, construction, and post-construction services.

NATIONWIDE
resources of
800+
employees
in 44 OFFICES
9offices in CALIFORNIA
delivered over 800 PROJECTS to
200 clients in CA in just the last 5 years

SERVICES
to more than
60 agencies
throughout CA
Section 1: Firm Organization, Credentials, Background
[ 4 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

COVID PREPAREDNESS
Our staff, and their safety and availability, are critical to successfully supporting the City. We currently abide by local mandates and work with our clients to follow their procedures to keep everyone safe. We are flexible and have been successful at modifying our procedures to match local, state, and national safety standards. We will continue to adjust our approach to best protect the livelihood of your team, your community, and our staff.

AUGMENTING THE TEAM
Geo-Advantec, Inc. | Geotechnical & Material Testing
Founded in 2012, Geo-Advantec, Inc. (GAI) provides a full range of responsive and quality geotechnical engineering, engineering geology, material testing, and inspection services for all phases of projects, from conceptual design through construction. GAI principals have worked successfully for more than 35 years in the industry. The firm currently has a team of more than 20 registered civil and geotechnical engineers, geologists, field and laboratory certified technicians, and special soil inspectors with a wide range of skills on public and private sector projects including pavement rehabilitation, roadways and transportation-related structures, educational and municipal buildings, public infrastructure facilities, utility lines, commercial, and industrial facilities and structures throughout Southern California.

GAI owns a full-service laboratory accredited by AMRL (ASSHTO Materials Reference Laboratory), in conformity to the requirements of the AASHTO Accreditation Program (AAP), AASHTO R-18, ASTM D3740, ASTM D1070 and ASTM E329; CCRL (Cement and Concrete Reference Laboratory); Caltrans; Division of the State Architect (DSA); City of Los Angeles; and Army Corps of Engineers.

The main areas of GAI's services and capabilities are geotechnical and geological engineering; geotechnical earthquake engineering; pavement engineering; field grading monitoring and soil testing; soil, asphalt/paving field inspection; soil, asphalt, and materials laboratory testing; and special inspections for concrete, welding, masonry, rebar, etc. GAI has provided multiple cities with geotechnical engineering and material testing services. Their professionals are experienced with the breadth of on-call agreement disciplines, as GAI is currently an on-call geotechnical consultant for Orange and Los Angeles Counties, among other entities. GAI staff are familiar with city standards, provisions, policies, and practices, and have worked on some of the following projects for cities/government agencies with similar scopes of work, complexity, and magnitude to the types of services requested in the City’s RFP:
aCity of Arcadia, Geotechnical Plan Review, Investigation, Monitoring, Testing, and Inspection for the Eisenhower Memorial Park Improvement aCity of Redondo Beach, Geotechnical Engineering Investigation for a Skateboard Yard at Dominguez Park; Material Testing and Inspection for Redondo Beach South Bay Regional Intermodal Transit Center aCity of Burbank, Independent Assurance Program and Geotechnical Engineering Services for Burbank Channel Bikeway Project, CML5200(046); Material Testing and Inspection for Local Residential Street Improvement (Phase IX) aCity of La Mirada, Soils and Material Testing and Inspection for Various Streets Pavement Rehabilitation as a part of the City’s CIP aCity of Commerce, Washington Boulevard Rehabilitation; Eastern Avenue Pavement Evaluation and Rehabilitation; Garfield Avenue and Ferguson Street Pavement Rehabilitation
aCity of Pomona, Geotechnical QAP AT/IA and Other Testing Services for Various Street Construction; Slope Failure Cause Investigation and Slope Stability Evaluation at Ganesha Park
aCity of Chino, Pavement Evaluation, Geotechnical and Material Special Inspection for El Prado Road Pavement Reconstruction between Kimball Avenue and Central Avenue; Pavement Evaluation and Recommendation for Grand Avenue HL Construction Management | Cost Estimating
HL Construction Management (HLCM) is an industry leader in Southern California, providing preconstruction cost estimating consultancy services for public sector clients. Its team of knowledgeable estimators provide cost estimates for planning and development of city facilities, infrastructure and sustainability on new construction and modernization. HLCM has a team of LEED-certified experts who understand the emerging innovative design strategies and sustainable design agenda that is appropriate for modern park design and playground amenities. HLCM works directly with architects, engineers, and other consultants as proactive participants in project cost control. HLCM also works closely with the design team focusing on the project budget goal, Section 1: Firm Organization, Credentials, Background
[ 5 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation developing a scoping document capturing all of the site features, such as site character, thematic play elements, sustainability, shade structures, tennis and basketball courts, sports lighting, gardens, hardscape, fencing, picturesque walks, native landscaping, picnic areas, and trail systems.

HLCM helps their clients maximize a project’s success with cost management, scheduling, change order negotiation, life-cycle analysis and sustainable design, from the earliest stages of project development through the final construction phase. HLCM is committed to quality, organization and consistency.

A sample of HLCM's relevant projects include:
aCity of Irvine, Great Park Ice and Sports Complex
aNewport Beach, Corona Del Mar High School Sports Field, Newport-Mesa USD aRancho Cordova, Rancho Cordova Little League
aCity of Rialto, Frisbee Park
aTown of Yucca Valley, Aquatics and Recreation Center
aCity of Carlsbad, Monroe Street Pool, Aquatic Facilities Renovation aCity of Ontario, Anthony Munoz Community Center Pool
aCity of Seal Beach, Aquatic Center
aCity of Tracy, Aquatic Facility and Multi-Generational Center

COMPLIANCE WITH THE RFP
aADA Compliance: Ardurra complies with the American with Disabilities Act (ADA) and related state and local laws and regulations. We have companywide policies, such as our Equal Opportunity Employment policy and Disability and Reasonable Accommodation policy. aConflict of Interest: We have no known conflicts of interest to disclose at this time. aContract Agreement: We understand and acknowledge that there will be no modifications or exceptions to the standard contract agreement.

TEAM ORGANIZATION
We have prepared an organization chart of our proposed team on the following page that illustrates the clear lines of authority and each person's role on this park rehabilitation project. Section 2 of this proposal describes the qualifications of our team members and includes resumes in the requested SF330 format. Within the separate cost proposal, we have indicated the percentage of time available for each person on our proposed team.

HLCM Services
aCost Estimating
aConceptual Design Phase - Construction
Document Phase
aChange Order Analysis and Negotiation
aLife-Cycle Cost Analysis
aValue Engineering
aProject Scheduling
aSustainability and LEED Analysis
aIntegration of Market Conditions
Section 1: Firm Organization, Credentials, Background
[ 6 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Organization Chart

CITY OF CYPRESS

PROJECT MANAGER
Nick Mangkalakiri, PE

PRINCIPAL-IN-CHARGE

INSPECTOR
Dino D’Emilia, PE, F.ASCE, QSD
Chip Vanderbeek, QSP

CONSTRUCTION MANAGER / CONSTRUCTABILITY REVIEW /

PROFESSIONAL DESIGN SUPPORT
John Wolitarsky, CCM

GEOTECHNICAL &

MATERIAL TESTING
GEO-ADVANTEC, INC.

Ronald Hanson, CEG, PG
Dominique McGee
Ivan Canales

COST ESTIMATING

HL CONSTRUCTION MANAGEMENT
Jay Helekar

PROJECT / DOCUMENTS CONTROL
Adam Banihamed
[ 7 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

RELEVANT EXPERIENCE
The following projects highlight some of our relevant experience with public agencies. As you will see, our team's expertise spans all facets of construction management—from administration and project controls to bidability and constructability review. Our reputation for providing quality services has been confirmed by our ongoing relationships and extended contracts with agencies throughout the region.

CYPRESS POLICE DEPARTMENT SEISMIC RETROFIT, EMERGENCY OPERATIONS

CENTER, AND MODERNIZATION PROJECT
Client: City of Cypress
Services: Bidability and Constructability Reviews, Peer Cost Estimating, Construction Management, Inspection
Start: 2020 Complete: 01/2022
Project Value: $3.2 million
Team Members: John Wolitarsky, CCM (Construction Manager); Dee Yeh (Project Controls) Ardurra performed bidability and constructability reviews and peer cost estimating services.

The existing Police Department structure was an approximately 20,000-square-foot, single-story building with a partial basement. The City used a roof-stiffening system for seismic strengthening. The improvements entailed relocating interior walls and making lighting upgrades, ADA improvements and architectural enhancements. Each design submittal bidability/constructability review is a result in Ardurra’s submittal of redlined plans and a punch list of comments and recommendations for the City’s consideration and implementation with the project architect/engineer. Ardurra reviewed the plans for bidability and constructability and identified potential value engineering solutions, ambiguities, conflicts and/or omissions that became apparent during its review. The bid documents and technical specifications were reviewed for potential duplication/overlap of clauses, conflicts, proper placement of critical requirements within the order and precedence of documents. Ardurra recommended key contract provisions to provide the necessary controls and remedies for the City to maintain a proactive approach on the project. Ardurra was also recently awarded construction management and inspection services to oversee the successful completion of construction activities associated with this project. The project includes interior improvements, structural improvements, exterior improvements, and temporary/phased improvements.

FOUNTAIN VALLEY RECREATION CENTER EXTERIOR IMPROVEMENTS Client: City of Fountain Valley
Services: Project Management, Construction Management, Building Inspection Start: 11/2017 Complete: 06/2018
Project Value: $1 million
Team Members: John Wolitarsky, CCM (Project/Construction Manager); Enedino Arroyos (Building Inspector); Dustin Blackwell (Documents Control)
Ardurra provided project and construction management for this $1-million project to renovate the outside of the City’s recreation center that was showing signs of wear after 40 years of use. Project management Our clients deserve successful project delivery and quality service, well-managed budgets, and thoroughly satisfied stakeholders while we work side-by-side with local and regional agency staff.

SECTION 2: EXPERIENCE
Section 2: Experience
[ 8 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation services included coordinating with the project architect and the City’s Public Works Department and Building and Safety Department to obtain required approvals for the proposed design. Also coordinated and prepared the City’s front-end specifications for inclusion of the technical specifications and packaged the construction documents for bidding. Attended all project-related meetings, including the City Council meeting, and coordinated contract for signature. Provided CM services for improvements to aging stucco, antiquated roof and windows, and deteriorating wood shake siding. The recreation center serves as an important gathering place for the city, which lacks a designated downtown area. Among the many community activities hosted in the complex and adjacent park are classes, concerts, meetings, the “Market in the Park” and additional activities for people of all ages. CM services included coordinating with City staff to keep the facility open to the public while construction activities were ongoing, requiring extensive community outreach activities.

SIGNAL HILL DOG PARK
Client: City of Signal Hill
Services: Construction Management
Start: 11/2017 Complete: 03/2018
Construction Value: $662,992
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); Stephen Badum, PE (Project Manager); Omar Alameddine, EIT (Construction Manager); John Wolitarsky, CCM (QA/QC); Dustin Blackwell (Project Controls)
Ardurra managed construction of a dog park for the enjoyment of the area’s canine residents and their owners. The project is located just south of the I-405 freeway between Atlantic and Orange Avenues. Dog park features include new artificial turf, landscaping, a parking lot and sidewalks. The park is enhanced with play mulch, crushed-granite walkways, seating, lighting, fencing, and drinking fountains. Throughout the project, Ardurra’s construction manager worked closely with the City’s inspector and Public Works Director. As part of construction management services, Ardurra provided public outreach in the field, quality assurance of work performed, participated in progress meetings, and ensured safe conditions as well as compliance with plans and specifications.
15TH STREET BIKE BOULEVARD OF PARKS
Client: City of Long Beach
Services: Construction Management
Start: 06/2019 Complete: 10/2019
Construction Value: $1.2 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); John Wolitarsky, CCM (Construction Manager); Dustin Blackwell (Document Controls) Long Beach prides itself on leading Southern California in constructing innovative, bike-friendly corridors. Ardurra provided CM services for this 2.5-mile bicycle connector in compliance with the City’s Bicycle Master Plan by providing a safer east-west bikeway connection between neighborhoods throughout Long Beach.

Generally, improvements included new bicycle/pedestrian facilities, way-finding signage, crosswalk enhancements, construction of intersection traffic circles, and reconstruction of curb ramps. The project also included construction of bulbouts and installation of a flashing warning system at one of the busiest intersections.

Section 2: Experience
[ 9 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

EL MONTE AQUATICS CENTER RENOVATION
Client: Pacific Architecture and Engineering
Services: Construction Management, Construction Inspection, Labor Compliance, Documents Control/Project Controls
Start: 10/2017 Complete: 12/2017
Construction Value: $1 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); John Wolitarsky, CCM (Construction Manager); Dana Hutchins (Inspector); Dustin Blackwell (Documents Control/Project Controls)
As a subconsultant to the architect, Ardurra provided comprehensive construction support services for complete renovation of the three public swimming pools that make up the City’s Aquatics Center. Only days before construction began, Ardurra stepped in to provide services after the City determined its internal staffing resources were insufficient for the project. Initial inspection services included observing and documenting such preliminary tasks as removing and storing two large bulkheads with a hoist, draining the pools, and water-blasting gutter grates to prepare for construction.

Ardurra’s construction manager and inspector provided oversight and monitoring, respectively, of safety measures, plaster and tile removal and re-plastering, light removal, and construction notice posting. Management and inspection also addressed construction waste disposal, measures to reduce dust and noise and the application of waterproofing. They served as project liaison during routine site visits from a labor compliance representative. Throughout the project, Ardurra ensured compliance with project plans and specifications.

Ardurra also performed closeout duties, such as final organization of the project files and submission to the City for final approval. As the project was funded with a federal Community Development Block Grant (CDBG), Ardurra ensured project compliance with relevant federal requirements.

CITY YARD SERVICES BUILDING PRECONSTRUCTION SERVICES
Client: City of Burbank
Services: Preconstruction Services
Start: 03/25/2021 Complete: 06/17/2021
Project Value: $8.5 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); John Wolitarsky, CCM (Construction Manager)
Ardurra provided preconstruction services to perform an independent and objective bidability evaluation as well as constructability review and peer cost estimating, and to provide construction phasing recommendations and a construction duration estimate for the City Yard Services Building (CYSB) project.

The new CYSB will replace the existing 1958 Forestry Supervisors building and the 1962 building maintenance and storage facility, and construction is planned for two phases. The CYSB will house staff for Public Works and Parks & Recreation, locker room and restroom facilities, a multi-purpose meeting room, separate equipment and material storage, separate main electrical and IT rooms, and a standalone prefabricated landscape storage building.

The new CYSB will be constructed within the confines of its existing campus. It is the project’s objective that campus operations continue to operate normally during construction, including interior pedestrian and vehicular circulation (though modified for safety), to the maximum extent possible, during the proposed two-phase construction effort.

Project Successes
aCity located competent construction
support at the last minute
aCity compliant with CDBG requirements
aPools closed for only two months,
despite major renovation
Section 2: Experience
[ 10 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

POLLIWOG PARK LOWER PLAYGROUND REPLACEMENT PROJECT
Client: City of Manhattan Beach
Services: Construction Management, Inspection
Start: 10/2021 Complete: 05/2022
Construction Value: $2 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); Omar Alameddine, EIT (Construction Manager); Chip Vanderbeek, QSP (Inspector) Ardurra is providing construction management and inspection services for Polliwog Park in Manhattan Beach. This project includes the removal and replacement of play equipment and the play surface, as well as fencing surrounding the lower play area near the pond. The play structure was last replaced with modernized equipment in 2003, so the existing playground equipment and padded surface had become in a state of disrepair due to the extensive wear and tear of heavy use by the public over the last 18 years.

And due to safety concerns, a substantial portion of the existing play equipment was placed off limits to users. In addition to revitalizing the play equipment and surface, the project also involves replacing portions of sidewalk between the play area and parking on Herrin Avenue and upgrading the existing accessible parking stalls on Herrin Avenue in compliance with current ADA standards. Ardurra is working diligently and closely with all shareholders to expedite the submittal, plan check, and approval of shop drawings and procurement of the shade sails in an effort to meet the contractual deadline for project completion.

DRAKE SOCCER FIELD PROJECT
Client: City of Long Beach
Services: Project Management, Construction Management
Start: 06/2016 Complete: 08/2017
Construction Value: $3.8 million
Team Members: Omar Alameddine, EIT (Construction Manager); Dustin Blackwell and Donna Sanabria (Documents Control) Ardurra provided project and construction management services for completion of two new soccer fields, a basketball court, a parkway with trail, a parking lot, new lighting, and landscaping including shade trees. Work on the 8-acre site involved demolition and grading, installing a park drainage system, concrete curbs, gutters, sidewalks, curb ramps, driveways, and paving asphalt surfaces. In addition to providing the community with a new recreational area, the project conserved energy and reduced waste by:
aUsing bioswales for some of the landscaping along the edges of the soccer fields and pathway
aUsing construction materials, at least 25% of which had been recycled aPlanting drought-tolerant landscaping
aInstallation of artificial turf for soccer fields/multi-use sports activity areas aInstalling energy-conserving field lighting
aSeparating and recycling at least 60% of all construction debris Design by Kompan
Section 2: Experience
[ 11 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

SIGNAL HILL VIEW PARK IMPROVEMENT PROJECT
Client: City of Signal Hill
Services: Construction Management
Start: 11/2021 Complete: Ongoing
Construction Value: $2.2 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); Dee Yeh and Mahina Payo (Project Controls/Documents Control) The City of Signal Hill is constructing a park using grant funds under a negotiated contract with the Conservation Corps of Long Beach (CCLB).

The total estimated construction cost is approximately $2.2 million. Park construction includes improvements such as rough grading, drainage, retaining walls, pedestrian trails, landscaping and irrigation, site furnishings, and lighting.

LOS AMIGOS PARK STORMWATER HARVESTING AND DIRECT-USE

DEMONSTRATION PROJECT
Client: City of Santa Monica
Services: Construction Management
Start: 06/2016 Complete: 05/2017
Construction Value: $2 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); Al Aguilera (Interim Inspector)
Ardurra provided construction management services for this pilot project to capture urban runoff from an existing Los Angeles County 48-inch storm drain, store it underground, treat and reuse it for irrigation and sanitation purposes by a municipal park. The completed system can harvest some 550,000 gallons of runoff per year for storage in a 53,500-gallon cistern underground. As needed, the water is treated to irrigate the park and for toilet flushing in public restrooms. Normally, the runoff would be treated and drain into Santa Monica Bay. Awarded 2017 Outstanding Small Project of the Year by the Metropolitan Los Angeles Branch of the American Society of Civil Engineers.

WHITAKER PARK IMPROVEMENTS, BUENA PARK
Client: David Volz Design (DVD) Landscape Architects, Inc.

Services: Civil Engineering Design
Start: 2020 Complete: Ongoing
Construction Value: $300,000
Team Members: Anissa Voyiatzes, PE, QSD, ENV SP (Engineering and Municipal Services Group Leader); Jose Hernandez, PE, QSD (Project Manager); Lisette Bice, PE, QSD, ENV SP (Quality Control Manager) In support of the design team led by DVD, Ardurra is providing the civil design portions of the park improvements at the Whitaker Elementary School in the city of Buena Park. The project entailed the creation of an approximately 3.5-acre public park within a portion of the existing elementary school playground. The scope of services consists of the following: base mapping including new topographic surveys; geotechnical report to support the park improvement and WQMP analysis; grading plan; civil design of the park trail, sidewalks, and hardscape; utility connections for an optional restroom addition; drainage design and WQMP component; and final contract documents.

Section 2: Experience
[ 12 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

BELMONT PLAZA POOL REBUILD/REVITALIZATION
Client: City of Long Beach
Services: Project Management
Start: 2014 Complete: Ongoing
Project Value: $85 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge); Oscar Gonzalez, PE (Project Manager); Gafur Oyewo (Assistant Project Manager); Joe Stoakley, PE, QSD (Assistant Project Manager); Dustin Blackwell (Project Controls Officer) Ardurra is providing project management services for construction of a $85-million world-class aquatic center on the former site of the historic Belmont Plaza Olympic Pool.

The aging original facility near the Belmont Pier was demolished in 2014 due to concerns over its seismic resilience. Dedicated in 1968, that oceanfront aquatic center hosted the preliminary U.S. Olympic swimming trials 15 days after it opened.

Plans call for a world-class facility to host regional and national competitive swim, water polo and diving events as well as programs and recreational swimming for the public.

Ardurra’s project involvement has taken many forms, from procuring contractors through the City’s Job Order Contracting Program to managing demolition of the massive original structure. The oversight has extended to construction of an office, a temporary aquatics lobby, and temporary restroom and shower facilities to support a newly constructed temporary pool. That 50-meter outdoor pool, adjacent to the site of the future aquatic center, is attracting numerous recreational and lap swimmers and hosts competitive meets.

Ardurra’s foundational role in this project is reflected in a wide range of activities and accomplishments to date. Ardurra represents the City in all negotiations, meetings and community outreach. Ardurra prepared a comprehensive request for qualifications and facilitated the evaluation of 21 proposals, the interview of five shortlisted firms and engagement of the selected world-class architectural team to design the project. Ardurra authors, maintains and updates a project website and administers project announcements through various media sources for the project. Ardurra is the primary contact for the project’s public relations. Ardurra manages the conceptual design, preparation and circulation of the Environmental Impact Report (EIR). Ardurra coordinates the public process required to support certification of the EIR and re-certification after receipt of several appeals. Ardurra assists the City in compiling the administrative record to prevail over a petition (lawsuit) challenging the certification of the EIR.

Ardurra assists with the processing of entitlements and the Coastal Development Permit Application (CDP) to the California Coastal Commission. The CDP application involves development of several supplemental studies including addressing alternate project sites, citywide programs to attract and enhance the vast city’s demographic population to experience and use the proposed facility, sea-level rise/wave uprush analyses as well as other key Coastal Commission concerns.

The project utilizes funding from the City’s Tidelands Capital Improvement Division. These funds are dependent on oil prices, which have dropped substantially since project inception. Funding is currently lacking to construct the facility. Ardurra is spearheading value engineering analyses and a subsequent entitlement and community outreach project to adjust the project to available funding sources.

Section 2: Experience
[ 13 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation RECREATION CENTER MASTER PLAN EXPANSION*
Client: City of Fountain Valley
Services: Engineering Design, Construction Management, Inspection Construction Value: $19 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Project Manager); Mark Lewis, PE, TE (Fountain Valley Director of Public Works/City Engineer)
Ardurra personnel (prior to employment with Ardurra) provided the design, CM, inspection and project closeout services for this major recreation center rehabilitation program. This extensive effort demolished and reconstructed facilities covering 55 acres. In addition, new recreational facilities covering 23.5 acres were constructed.

The new construction included six multi-league
softball fields, a youth field, 555 parking spaces,
2 miles of roads and 78 acres of computercontrolled sports field lighting. Other new facilities include a 60,000-square-foot gathering
space with an outdoor stage and more than
3 miles of granite trails and sidewalks. Other
upgrades included recycled water irrigation,
picnic areas, playgrounds, two new concession
buildings, and a new maintenance facility.
*The services on this project were delivered by
Ardurra staff prior to employment with Ardurra.

ROUNDHOUSE MARINE STUDIES LAB AND AQUARIUM
Client: City of Manhattan Beach
Services: Project Management
Start: 09/2016 Complete: 06/2018
Construction Value: $5.3 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge, Project Manager); Dustin Blackwell (Project Controls Officer) As project manager, Ardurra oversaw the complex renovation of a cherished city landmark, the Roundhouse Aquarium on the Manhattan Beach Pier. After years of exposure to the elements, the structure had begun to fall into disrepair. Space constraints stood in the way of offering a relevant, differencemaking learning experience. While the building’s size was relatively small, the constraints and conflicting priorities to be coordinated were mammoth. Ardurra facilitated the resolution of each challenge through collaboration with key stakeholders and leveraging the skills of specialty subcontractors, an environmental consultant and an aquarium architect. A grand opening celebration in November 2018 drew enthusiastic project stakeholders and local dignitaries. The project received an American Council of Engineering Companies (ACEC) 2019 Merit Award; an American Public Works Association 2019 BEST Project of the Year Award, Southern California Chapter; and a 2020 CMAA Southern California Chapter Project of the Year Award.

Section 2: Experience
[ 14 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

OSO CREEK MULTI-USE TRAIL PROJECT
Client: City of Laguna Niguel
Services: Construction Management, Inspection
Start: 03/2015 Complete: 12/2015
Construction Value: $3 million
Team Members: Lisa Penna, PE, F.ASCE, QSD (Principal-in-Charge); Dino D’Emilia, PE, QSD (QA/QC Manager); Donna Sanabria (Documents Control)
Ardurra provided construction management and inspection services for this project that created new contiguous bicycle and pedestrian-equestrian trails. The project installed stormwater control and treatment best management practices, landscaping, lighting and street improvements.

The project is located along Oso Creek Channel between the Laguna Niguel Metrolink Station and the Three Flags commercial center. The site is partially on City street right-of-way and partially on Orange County Flood Control District right-of-way for the Oso Creek flood control channel. Ardurra provided grant services for the project, which was funded primarily by an OCTA Tier 2 Environmental Cleanup Program grant and a State Water Resources Control Board Proposition 84 stormwater grant. This multi-use trail project won the American Society of Civil Engineers (ASCE) Bikeways and Trails Project of the Year Award in 2015.

ALAMITOS BEACH CONCESSION BUILDING
Client: City of Long Beach
Services: Project Management, Construction Management, Peer Estimate Start: 2019 Complete: Ongoing
Construction Value: $6.5 million
Team Members: Dino D’Emilia, PE, F.ASCE, QSD (Principal-in-Charge, Construction Manager); Dustin Blackwell and Adam Banihamed (Assistant Construction Manager, Project Controls); HLCM (Peer Estimate) Ardurra was engaged to take over the provision of CM services for the construction of a two-story beach restaurant, a public beach restroom, beach rental facility, and a dune-themed beach playground. Shortly after construction began, the project experienced complex and substantial issues that impacted the budget and schedule. In order to expeditiously address the problems, the City engaged the Ardurra PM/ CM team to replace the original construction management team and assist the project team to keep the project on track and minimize the impacts to the project.

Ardurra assisted the City to resolve the following complex construction challenges on the project including:
aA substantial foundation re-design, cost and time change order negotiations and processing aContractor delays resulting from subcontracting difficulties aContractor posturing with RFIs and potential claim correspondences aAdditional coordination meetings to address contractor issues aBurdensome RFI and submittal process due to contractor posturing and staff lacking industry competence aSite coordination around the Grand Prix Event due to project delays aCoronavirus (COVID-19) Pandemic/Stay-at-Home Orders related matters aSurety takeover and replacement of defaulted contractor Section 2: Experience
[ 15 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Ardurra also provided project control services to maintain tight and efficient documentation, and to coordinate quality assurance special and deputy testing for the project. Ardurra worked collaboratively with the project design team, the City’s full-time inspector and City’s project management and construction services departments to deliver the project.

Subconsultant HL Construction Management (HLCM) was utilized to compile a peer estimate for changes to the foundation design in order to assist with potential claim resolution.

ADDITIONAL PROJECT EXPERIENCE
Provided below are a few representative projects for our subconsultants GAI and HLCM.

GAI Projects
City of Arcadia, Geotechnical Plan Review, Investigation, Monitoring, Testing, and Inspection for the Eisenhower Memorial Park Improvement (2020) GAI performed a geotechnical plan review, geotechnical engineering evaluation/investigation, and during construction geotechnical materials inspection and testing for Eisenhower Memorial Park Renovations. Our geotechnical plan review services consisted of reviewing, editing, and stamping the plans provided by the City. GAI's geotechnical engineering investigation consisted of field exploration, laboratory testing, office engineering, and a final report for the design and construction of the project. During construction, services included providing field monitoring, testing, and inspection; performing laboratory tests on subgrade, base, masonry, and concrete; and preparing and submitting daily inspection reports.

The project involved construction of two restroom/concession facilities, baseball fields, parking area, dog park, scoreboard, new bleachers, shade shelters, and a pedestrian bridge, amongst other improvements.

City of Burbank, Independent Assurance Program and Geotechnical Engineering Services for Burbank Channel Bikeway Project, CML-5200(046) (2019-2020) The project included the construction of a new sidewalk and boardwalk, installation of piles where the boardwalk is elevated above the ground surface, installation of modular walls and various culverts, ramps lighting and restriping for the site. GAI provided during construction geotechnical observation and monitoring, Independent Assurance Program (IAP) inspection and testing, materials special inspection, and laboratory testing services for construction of a bike path along Burbank Channel from Olive Avenue to Alameda Avenue. GAI's assigned engineer was on site full-time during drilling and pile installation, to confirm the integrity of the drilled hole and to confirm that the drilled subsurface materials were consistent with the findings of previous investigations.

City of City of Chino, Pavement Evaluation, Geotechnical and Materials Special Inspection for El Prado Road Pavement Reconstruction Between Kimball Avenue and Central Avenue (2020) The project involved reconstruction of the pavement section for El Prado Road between Kimball Avenue and Central Avenue, and included pulverizing the existing asphalt and base layers, mixing the pulverized materials with cement, compacting and curing of the cement-treated base, and placing

6.5 inches of asphalt on top of the treated base layer. The project also included the R&R of some existing curb and gutter and ramps and crosswalks.

GAI provided an as-constructed pavement evaluation to evaluate strength characteristics of the recently paved section, including asphalt concrete and cement stabilized pulverized base (CSPB) placed at El Prado Road between Kimball Avenue and Central Avenue. GAI performed site reconnaissance and finalized testing segments; traffic control during the field operation; Falling Weight Deflectometer (FWD) test along the entire length of the street, with 200-foot apart tests, and 50-foot apart tests in two limited segments; evaluated and analyzed the FWD test data; and prepared a final report.
“Nice work team! This is a huge milestone
for the project. Terminating a contractor,
negotiating with the surety, onboarding
a replacement contractor, fielding the
media inquiries, and expediting review
and execution of the takeover agreement
is no easy task. But this team made it look
effortless. Thanks for all the hard work and
late nights to bring this together.”
– Joshua Hickman, Bureau Manager,
City of Long Beach Public Works
Business Operations Bureau
Section 2: Experience
[ 16 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation GAI also provided all the during-construction geotechnical and material special inspection services for this project. GAI’s scope of services included providing field monitoring, testing and continuous and periodic inspection for the street pavement work, performing laboratory tests on subgrade, concrete, and asphalt materials, preparing, and submitting daily inspection reports.

City of Pomona, Slope Failure Cause Investigation and Slope Stability Evaluation at Ganesha Park (2017) After several severe rains during early 2017, the City of Pomona noticed a slope failure on the ascending slope above Paige Drive in Ganesha Park.

The City hired GAI to perform site observation and investigation; prepare a report that discussed the observed failures and causes; and provide temporary mitigative measures for stabilizing the slope. Due to urgency of the task and satiability concerns, GAI completed the investigative tasks and entire scope of work in less than a week.

HLCM Projects
Corona Del Mar High School Sports Fields Newport-Mesa USD, Newport Beach (2018) This project involved a design development and construction document milestone estimates. Scope includes replacement of existing track and field with new synthetic turf field, modernization of existing men’s/women’s restrooms, perimeter fencing, associated grading and site work, irrigation and landscape work, site lighting and electrical work.

Adventure Playground, Yorba Linda (2021)
This Adventure Playground renovation project features a waterfall, waterslide, water play area with splash pad, zipline adjacent to a treehouse with elevated cat walks, slide, and a maze. A multi-purpose area, play field, and supportive facilities are also included for the visitors.

HLCM provided a construction document milestone estimate. The base scope elements included a waterslide, treehouses, zipline, offices, wood storage building, splash pad, wiffleball field, and sitework.

HLCM’s team provided probable construction costs on the components of MEP design, sustainable features, complex electrical infrastructure, associated hardscape and synthetic surfacing elements. The water play amenities required significant utility infrastructure.

Anthony Munoz Community Center, Ontario (2019)
This community center includes a 2,500-SF multi-purpose room, teaching kitchen, two activity/ classrooms, tot room with outdoor play area, administrative office space and a 25-yard recreation pool with an enclosed patio area. The MPR room opens to views of the park playing fields, and views of the San Bernardino mountains.

HLCM provided the schematic, design development and construction document milestone estimates.

HLCM guided the design team to develop the budget goal for site development, open space improvements, and pool. The estimating team provided cost solutions to the limited budget constraints of this public project.

Rancho Cordova Little League Facilities Renovation, Rancho Cordova (2021) This project involved a schematic design milestone estimate. Scope included a modular building with concessions, storage and restrooms, sitework, and an FFE owner purchase aluminum bleacher. The project was funded by the city’s Community Enhancement Fund.

Great Park Ice, Irvine (2019)
This LEED Silver facility is a pioneering hockey and community center in Southern California. It features four indoor ice rinks (three NHL regulation rinks and one Olympic regulation rink). Other features include a sports bar, party rooms, classrooms, and outdoor public spaces and amenities.

The design team incorporated the various phases of water throughout, including vapor, liquid, and frozen. HLCM provided extensive change order analysis and negotiation. HLCM was tasked with substantiating and validating numerous costs involved and submitted on this $110-million facility.

The scope included a comprehensive and detailed study of the contractual scope of equipment, labor, installation costs, and schedules.

Section 2: Experience
[ 17 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

REFERENCES
We are proud of our track record of successfully delivering quality projects and services, to which our references will attest. Below are a few of our client contacts for which we are providing similar construction management and inspection services. Descriptions of these projects are shown above.

Name: Kelli Tunnicliff (former Signal Hill
Public Works Director, now with City of
Lakewood)
Temo Galvez, PE Eric O. Lopez
Title: Deputy Director of Public Works Deputy Director of Public Works/ City Engineer
Public Works Director
Agency: City of Signal Hill (contact now with the
City of Lakewood)
City of Fountain Valley City of Long Beach
Project: Signal Hill Dog Park Fountain Valley Recreation Center Exterior Improvements
15th Street Bike Boulevard of Parks
Ardurra
Team:

Dino D’Emilia (PIC)
John Wolitarsky (QA/QC)
Dino D’Emilia (PIC)
John Wolitarsky, CCM (PM/CM)
Dino D’Emilia (PIC)
John Wolitarsky, CCM (CM)
Phone: 562.209.0037 949.294.4508 562.570.5690
Email: [email protected] [email protected] [email protected]

RESUMES
Our proposed team members (shown in the organization chart on page 6) are highly skilled in their respective fields, and assembled together offer the City an experienced team ready to deliver this important park rehabilitation project for the community of Cypress.

Led by a seasoned construction manager that you know and trust, John Wolitarsky recently provided CM services for the City's Police Department Modernization Project and has built excellent working relationships with City staff and has become very familiar with the inner structure of the City. Over the course of his career, John has provided CM services for more than 50 acres of parkland projects, including mass grading, offsite improvements, new playgrounds, baseball fields, trail systems, restrooms and other park-related amenities. In addition, John has provided constructability review, collaborated with other design professionals, and coordinated cost estimation services on several high-profile projects across Southern California. John will draw on this experience to lead this project, maintain the schedule and budget, and work quickly towards solutions as challenges arise in the field.

John's qualifications, along with the qualifications for our key personnel, are provided in the resumes on the following pages. We would be happy to provide more detailed resumes if the City requests.

Section 2: Experience
[ 18 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dino D’Emilia, PE, F.ASCE, QSD Principal-in-Charge (PIC) a. TOTAL b. WITH CURRENT FIRM
31 12

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Civil Engineering 1996/PE/CA #C55453

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dino D’Emilia brings extensive experience in project leadership, CM and civil engineering. He has completed nearly $1B in local agency public works projects in Southern California. He is known as a project and construction manager who directly engages in both the intricacies of projects as well as overall quality, timely completion and cost-effectiveness. He brings expert-level knowledge of the Caltrans LAPM and relevant federal regulations and documentation.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm PIC for this $1M exterior renovation of the City’s 40-year-old recreation center. Managed replacement of the building’s storefront windows, doors and roof. Oversaw construction of a new entry area and the repainting of the entire building exterior. The center remained open for classes and community activities throughout construction.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm PM for the $103.1M aquatics center replacing the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional and national levels. Represents the City and its interests in all negotiations, meetings, community outreach, entitlements, permitting, design management and related activities throughout the project. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alamitos Beach Concession Building
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm PIC for the construction of a 2-story beach concession stand/restaurant and two auxiliary buildings. Ardurra provided documents control services to streamline the workload and lessen the budget needed to complete the project. Included submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Program Management
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm PIC for $4M project management services contract. Due to a heavy staff workload, the City sought project management support to finish a variety of improvements. To date, Ardurra has managed projects valued at more than $50M. These include: bicycle improvements at Ocean and Shoreline, Seaside Way street improvements, 11th Place stairway and bluff repair, water quality improvements, stormwater total maximum daily load compliance, the Leeway Sailing and Aquatic Center expansion and renovation, beach restroom replacements, the new Seaside Way pedestrian bridge, new beachfront pedestrian and bicycle path, Belmont Pier feasibility study and interim improvements, Cherry Beach Playground, beach basketball courts at Junipero, Drake Soccer Field, Pine Avenue-Seaside Way to Anaheim Street, Wrigley Greenbelt, DeForest Park Duck Pond, Colorado Lagoon Restoration, beach concession stand improvements, beach maintenance facility clarifier and office improvements, and Naples Seawall improvements, Phase 1. Provides scheduling training and peer reviews for staff of Public Works Department and Tidelands Division.

Section 2: Experience
Section 2: Experience
[ 19 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE John Wolitarsky, CCM Construction Manager, Constructability Review, Professional Design Support
a. TOTAL b. WITH CURRENT FIRM
36 6

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Business Administration Certified Construction Manager, CMAA #10457

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) John Wolitarsky has delivered critical public facility, recreation, aquatics, roadway, water and utility improvement projects for many Southern California cities and regional agencies. He has managed high-profile arterial roadway improvements, such as the City of Fountain Valley’s $3.2M Edinger Avenue-Harbor Boulevard rehabilitation. John’s equally extensive water project background includes the renewal and replacement of domestic water and sewer lines and reservoirs. For the City of South Pasadena, John directed the $20M Garfield Reservoir replacement. His public facility improvement work also includes recreation complexes, fire stations, fountains, more than 50 acres of parkland projects, and aquatic centers such as the $12M City of Santa Monica Aquatic Center.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Construction Management for Santa Clarita Parks
(Santa Clarita, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2007 2007
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction manager for Phase 3 of the Central Park Master Plan, a $1.6M project that built two full-size, lighted multi-use sports fields; a basketball court and resurfaced existing courts; irrigation and shade structures; 170 parking spaces; and an enhanced path for walking and running. Construction manager for Todd Longshore Park, a $2.5M improvements project upgrading a10-acre hillside park with city views and entailed extensive grading and construction of a concrete trail system, ADA-compliant restrooms, and installation of play equipment, decorative lighting, landscaping and irrigation.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $1M exterior renovation of the City’s 40-year-old recreation center. Managed replacement of the building’s storefront windows, doors and roof. Oversaw construction of a new entry area and the repainting of the entire building exterior. Delivered the project on schedule and within budget through close coordination with City staff, contractor and architect. The center remained open for classes and community activities throughout construction.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED El Monte Aquatic Center Renovation
(El Monte, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for extensive updates to a municipal aquatic center with three pools. The $950K project required such steps as removing and storing two large bulkheads with a crane, draining the pools and water-blasting gutter grates to prepare for construction. Services included monitoring safety measures, plaster and tile removal and re-plastering, light removal, construction notice posting, construction waste disposal, dust and noise control. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cypress Police Department Seismic Retrofit, Emergency
Operations Center, and Modernization Project (Cypress, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $3.2M seismic upgrade and complete modernization to the interior of the existing Police Department (PD). This 20,000 SF building with a partial basement includes new electrical, HVAC, office space, conference rooms, restrooms/locker rooms, evidence room, an outdoor patio, as well as seismic retrofitting of the building. Required substantial coordination with the PD to relocate personnel to temporary trailers during construction.

Section 2: Experience
Section 2: Experience
[ 20 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Chip Vanderbeek, QSP Inspector
a. TOTAL b. WITH CURRENT FIRM
44 4

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Geology/Civil Engineering Studies; HAZWOPER 40 Hour;
HAZWOPER 24 Hour Certified Supervisor; Campbell Nuclear Gauge Qualified SWPPP Practitioner (QSP) #27109
Certified Inspector of Sediment and Erosion Control (CISEC) #2688

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Chip Vanderbeek has overseen grading operations and been responsible for QC of several multi-million cubic-yard hillside and flat land grading projects. Chip’s inspection background includes inspection and testing of reclaimed and potable water systems, sewer, storm drain water, subgrade, base course, asphalt and concrete inspection, shoring and deep caisson inspection, and earth retention wall systems. Chip has performed preliminary geotechnical investigations, report preparation, asphalt and concrete inspection, foundation inspection, soils and materials laboratory work and geotechnical investigations. Chip has provided inspection services for various park projects throughout Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Laguna Hills Community Center and Sports Complex
(Laguna Hills, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2001 2001
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Inspection services for grading, wet/dry utilities, concrete, curb and gutter subgrade, base, paving, and retaining walls. Project included several soccer fields, baseball diamonds, a skateboard park, a roller hockey rink, a tot lot, and playground area. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Shea Homes at Glenwood
(Aliso Viejo, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2011 2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Inspection services for the construction of 6.4 acres of public parks that included two tot lots, several trails and fitness stations. Also lead inspector for $65M Glenwood Development. Project involved hillside grading and utility installation for a 250 single- and multi-family lot development and associated infrastructure. Inspected construction and installation of sewer, storm drain, and over 6,000 feet of potable and recycled water lines and dry utilities. Responsibilities included overseeing grading operations, supervising personnel, quality control, weekly project team meetings, writing field memoranda, client contacts and preparing geotechnical reports. Assisted offsite superintendent and PM with assessing quantities, schedules, and RFIs. Inspected the construction and installation of sewer, storm drain, water lines and dry utilities. Inspected curb and gutter, roadway subgrade, aggregate base, asphalt paving and sidewalks; footings for retaining walls, MSE walls and houses. Lead inspector for $4.2M construction of a recreation center building, aquatic center, and associated underground improvements and parking lot construction. Verified quantities, submittals and RFIs. Inspected onsite tract work for sewer, water, and joint trench services, as well as City sidewalks, driveways, and flatwork. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place Park Residential Development
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspection services for paving during construction of the Ocean Place park residential development. Ocean Place is a very important park and development for the City. Construction involved site preparation, grading, slope and erosion control, sanitary sewers, domestic water, onsite and offsite street improvements, onsite and offsite storm drain and water quality BMPs. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place (Tract 17425) CM and Inspection
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector responsible for finishing of grading and drainage of a park, all offsite and onsite utility and street work, re-certifying of pads used for laydown, final check of grading and area drains after the homes are built per plan.

Section 2: Experience
Section 2: Experience
[ 21 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adam Banihamed Projects Controls/Documents Control
a. TOTAL b. WITH CURRENT FIRM
3 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/California State University, Northridge

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Adam Banihamed is a documents control and project controls specialist with a passion for the structural aspect of civil engineering. Adam produces, processes, and archives construction documents related to cost estimates, project progress, payroll management, change orders, RFIs and submittals.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alamitos Beach Concession Building
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for the construction of a 2-story beach concession stand/restaurant and two auxiliary buildings. Ardurra provided documents control services to streamline the workload and lessen the budget needed to complete the project.

Responsibilities included submittal review, meeting preparation, keeping RFI log up to date, logging and file inspection requests and reports, assist in preparing independent cost estimates and updating plan sheets. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assists with project controls for the $103.1M aquatics center replacing the now-demolished Belmont Olympic Pool. The new facility will host swimming, water polo and platform diving events at the local, regional and national levels. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for CM and inspection of the new $11.5M Redondo Beach Transit Center. Responsibilities include bid filing and maintaining a plan revisions spreadsheet. Phase one of the project includes construction of a new Transit Center to replace the existing Transit Center located adjacent to the Galleria. The new Transit Center will be constructed at a site south of Target along Kingsdale Avenue. When completed, the new Transit Center will consist of a 2,900 SF building housing an operator lounge, private restrooms, public restrooms, and offices. Other improvements include a kiss-and-ride parking lot and passenger drop-off area, as well as bus bays. In addition, traffic signals, striping and construction of an upper-level parking lot will be included. Phase two improvements will include the widening and realignment of Kingsdale Avenue between Grant Avenue and Artesia Boulevard. This roadway improvement will include an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping on the easterly side of the newly widened street adjacent to the Galleria Shopping Center.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assists with project controls for this $21M flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers. This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas, and retail spaces. The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and construction of an extension of 208th Street as well as related improvements.

Section 2: Experience
Section 2: Experience
[ 22 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Jay Helekar Cost Estimator
a. TOTAL b. WITH CURRENT FIRM
25 14

15. FIRM NAME AND LOCATION (CITY AND STATE)
HL Construction Management (Orange, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) AA, Cal State University, Long Beach LEED AP BD+C (US Green Building Council)

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Jay Helekar brings 25 years of preconstruction cost estimating consulting experience with public sector projects. He understands the preconstruction effort of publicly funded projects and the challenges and cost implications of the planning and design. As principal and founder of HLCM, Jay oversees a premier estimating team that provides project controls including cost estimating, change order analysis, scheduling,and constructability reviews. He was selected to teach a series of cost estimating courses for an intern training program at a themed entertainment park in Anaheim.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Adventure Playground
(Yorba Linda, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a construction document estimate milestone for a scope for a new waterslide, mud pit, rope swing, wiffleball field, and zipline. The Master Plan includes newly added amenities such as a rock climbing wall, treehouse structures and suspension bridges, splash pad and water features, large shade/seating area, a meandering creek, and updated storage areas. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Anthony Munoz Community Center
(Ontario, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved schematic, design development, and construction document milestones for a new 60,000 SF community center, construction of a new single-story recreation and aquatic center featuring an MPR, a modern kitchen, an activity room, tot room with tot playground, a new youth playground, swimming pool with large pool deck, and paved courtyard and mountain-view terrace. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rancho Cordova Little League Facilities Renovation
(Rancho Cordova, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a schematic design milestone estimate. Scope included a modular building with concessions, storage and restrooms, sitework, and an FFE owner purchase aluminum bleacher. The project was funded by the City’s Community Enhancement Fund. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Aquatics and Recreation Center
(Yucca Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a ROM and 50% schematic design milestone estimate. Funded by a $22M state grant, this aquatics and fitness center includes a hybrid indoor pool, additional new indoor recreation amenities, a one-court gymnasium. Exterior improvements include a splash pad, an exercise walking/jogging path, multi-purpose landscape areas, and surface parking. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Corona Del Mar High School Sports Fields Newport-Mesa USD (Newport Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a design development and construction document milestone estimates. Scope includes replacement of existing track and field with new synthetic turf field, modernization of existing men’s/women’s restrooms, perimeter fencing, associated grading and site work, irrigation and landscape work, site lighting and electrical work.

Section 2: Experience
Section 2: Experience
[ 23 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ronald Hanson, CEG, PG Geotechnical & Material Testing
a. TOTAL b. WITH CURRENT FIRM
37 10

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS, Geology
Graduate Courses in Geology
California Certified Engineering Geologist #1841
California Professional Geologist #5143

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Ronald Hanson is a California Professional Geologist with over 37 years of experience performing geological/geotechnical investigations, geologic/soils inspections and preparing geological reports. He has supervised and worked on numerous grading operations and was the lead geologic inspector of the CC Ranch project in Castaic, a large project that consisted of 4M yards of soil being moved. He has worked as the Public Works Inspector of Record.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for Redondo Beach South Bay Regional Intermodal Transit Center (Redondo Beach, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior inspector for this project that involved the construction of a new transit building, bus bays, retaining walls, parking lot and associated appurtenances. During construction GAI performed field monitoring, testing and inspection for the grading work, laboratory tests on soils, base asphalt and concrete, and preparing and submitting daily inspection reports. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eisenhower Memorial Park Improvement Project
(Arcadia, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal engineering geologist for this project that involved construction of two restroom/concession facilities, baseball fields, parking area, dog park, scoreboard, new bleachers, shade shelters, and a pedestrian bridge. GAI performed a geotechnical plan review, geotechnical engineering evaluation/investigation, and during construction geotechnical materials inspection and testing for the park renovations. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Investigation, Field Observation and Testing for Avenida Entrada, et al., Street Improvements(San Dimas, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal engineering geologist for this project that involved rehabilitation of residential street improvements, including FDRR of the entire asphalt concrete and base layer, reworking of the subgrade soils, and placing back well-compacted layers of base and asphalt concrete. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pavement Engineering, Field Inspection and Testing for
Washington Blvd. Rehabilitation (Commerce, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Field supervisor/principal engineering geologist for this project that involved the rehabilitation, reconstruction, and widening covering a

2.7-mile-segment of Washington Boulevard, widening of the boulevard from two lanes to three lanes in each direction. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Slope Failure Cause Investigation and Slope Stability
Evaluation at Ganesha Park (Pomona, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Field supervisor/principal engineering geologist for this project that involved slope failure on the ascending slope above Paige Drive in Ganesha Park. GAI performed site observation and investigation; prepared a report that discussed the observed failures and causes; and provided temporary mitigative measures for stabilizing the slope. Due to urgency of the task and satiability concerns, GAI completed the investigative tasks and entire scope of work in less than a week.

Section 2: Experience
Section 2: Experience
[ 24 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dominique McGee Soil/Concrete Inspector
a. TOTAL b. WITH CURRENT FIRM
3 <1

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) High School Diploma ACI Concrete Field Testing Technician-Grade I (#1404510) APNGA Portable Nuclear Gauge Safety & USDOT Hazmat Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dominique McGee has performed as inspector of soil, concrete, and asphalt on several public works projects in Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Services for Torrance Transit Park & Ride
Regional Terminal, Phase I-Rough Grading (Torrance, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved a proposed one-story and a two-story building, bus platform, canopies and pavement of the designated areas. Provided geotechnical services, grading observation and soils testing for different components of the project. The purpose of testing and inspection of the grading operations was to verify that the completed work complied with the project plans, specifications, special provisions, and geotechnical recommendations.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 3rd Avenue, Starhill Lane, Don Julian Road, and Basetdale Avenue Waterline Improvements (Industry, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved construction of new water lines along 3rd Avenue, Starhill Lane, Don Julian Road and Basetdale Avenue, which included removing the existing pavement, trenching and backfilling and replacing with new pavement. Provided field monitoring, testing and inspection for the utility trench work, and prepared and submitted daily inspection reports. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for San Manuel Band of Mission Indians for San Manuel 66-kV Substation (Highland, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the construction of a new substation, which included placement of new electrical lines and trenches, perimeter wall, utilities and pavement replacement.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical and Materials Testing and Inspection for Cypress Police Department Modernization (Cypress, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the modernization of the existing police department building, which includes new utilities, a new patio and seismic retrofitting.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils/Materials Testing and Inspection for Modernization of Leuzinger High School Athletic Fields/Facilities(Lawndale, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector/technician for this project that involved the renovation/reconstruction/modernization of the athletic fields and facilities at Leuzinger High School. GAI's work included field inspection and testing for soils, concrete and masonry; welding, NDT testing and field-pull testing and observation; laboratory testing on soils, concrete, and masonry; providing daily reports on field observations and testing; and providing DSA 291 and 293 reports.

Section 2: Experience
Section 2: Experience
[ 25 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ivan Canales Soil/Concrete Inspector
a. TOTAL b. WITH CURRENT FIRM
1 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BA, Sociology (Minor in Education) ICC: SI Soils Codes Module; Special Inspector General Requirements (#9801915); APNGA Portable Nuclear Gauge Safety Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Ivan Canales has performed as inspector of soil, concrete, and asphalt on public works projects in Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Services for Torrance Transit Park & Ride
Regional Terminal, Phase I-Rough Grading (Torrance, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved a proposed one-story and a two-story building, bus platform, canopies and pavement of the designated areas. Provided geotechnical services, grading observation and soils testing. The purpose of testing and inspection of the grading operations was to verify that the completed work complied with the project plans, specifications, special provisions, and geotechnical recommendations. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for Redondo Beach South Bay Regional Intermodal Transit Center (Redondo Beach, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved construction of a new transit building, bus bays, retaining walls, parking lot and associated appurtenances. During construction, GAI provided field monitoring, testing and inspection for the grading work, laboratory tests on soils, base asphalt and concrete; and preparing and submitting daily inspection reports. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection Services for the
Reconstruction and Overlay of Covina Boulevard (San Dimas, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the reconstruction and overlay of Covina Boulevard from the 57 freeway on-ramp to Arrow Highway, as well as the removal and replacement of existing curb and gutter, curb ramps, and sidewalk reconstruction. Provided field monitoring, testing and inspection for the street pavement work, and prepared and submitted daily inspection reports. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Monitoring and Materials Testing Services for Descanso Drive Street Improvements(La Canada Flintridge, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the resurfacing of Descanso Drive from Verdugo Blvd. to Chevy Chase Drive in the city of La Canada Flintridge. The project also included the removal and replacement of existing curb and gutter, sidewalk and drive approach reconstruction. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils and Materials Testing and Inspection for Lakewood High School Track and Field (Lakewood, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector/technician for this project that involved replacement of existing track with an all-weather track surface; replacement of the electronic scoreboard; reconstruction of the existing bleachers to create accessible seating; and replacement of the field with synthetic turf. GAI's scope included soils/grading monitoring and testing, testing of concrete and reinforcing steel, earth work/soils inspection, asphaltic concrete plant inspection, asphaltic concrete placement inspection, concrete batch plant inspection, concrete placement inspection and sampling, concrete and masonry sampling and testing, and all other field inspection and laboratory testing, as required.

Section 2: Experience
[ 26 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation

UNDERSTANDING
Based on a thorough review of the City’s RFP for the Arnold Cypress Park Rehabilitation Project, Ardurra understands that the City wishes to retain the services of a qualified and experienced firm to provide professional services required to successfully undertake and complete all required phases of this project. In particular, the phases will consist of constructability review and probable cost of construction services in coordination with the design group and City staff during the design phase of the project; assist the City with prequalifying construction contractors prior to the bid phase; and provide construction management and inspection services once the construction phase begins.

The City through its Public Works Department will soon engage a design group to incorporate the new park amenities that were determined as priorities as a result of community workshops.

As reflected in the current conceptual plan for the project, the list of amenities will include the following:
aFour softball fields
aBatting cages
aSix pickle ball courts
aOne multi-use court
aCentralized restroom and concession building
aBasketball/volleyball court
aPlayground areas
aPicnic pavilion
aWalking/jogging path with exercise equipment stations
It is anticipated that the design phase of the project will be completed within 9 – 12 months, and the anticipated construction duration is 12 months. Although figures have not been finalized, it is projected that the construction value of this project will be between $12,500,000 and $15,000,000.

SCOPE OF SERVICES
Ardurra has assembled a highly experienced and knowledgeable team of proven professionals that have worked on projects similar in scope and size. With the expertise of this team, we will provide the City with strong support and effective guidance during the following project phases:

Constructability Review/Design Support Services:
aParticipate in design team meetings and provide input
aOngoing review of design elements and cost estimates
aProvide formal constructability review at 60% and 90% design plans aReview and prepare probable cost of construction estimates at 60% and 90% complete design plans Our approach provides you streamlined delivery, improved communications, and enhanced project outcomes.

We adapt our process and manage our resources to meet your needs and your project.

SECTION 3: PROJECT UNDERSTANDING

AND MANAGEMENT APPROACH
Home to Cypress Girls' Softball
Arnold Cypress Park Conceptual Plan provided in the RFP Section 3: Project Understanding and Management Approach [ 27 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Preconstruction Support Services:
aAssist the City in preparing the contractor prequalification package aAssist the City with review of the prequalification packages submitted by contractors Construction Management and Inspection Services:
aProvide preconstruction services
aProvide CM services during construction, including conducting weekly construction progress meetings, monitoring of construction schedule and project budget, as well as review and processing of change orders, progress payments and monitoring of BMPs aProvide project inspection services during construction, including required testing coordination, ensuring strict adherence to the project plans and specifications, and provide ongoing QA/QC
aProvide document tracking and control, inclusive of RFIs, submittals, change orders, weekly statement of working days, progress payments, meeting agendas and minutes, progress reports, test results, claims, daily inspection logs, time and material reporting, project photos, monitoring of as-built plans, tracking of punch list items and project closeout In addition to the services outlined above, the Ardurra team will look at potential issues outside the envelope of the project itself and look at potential offsite issues that could impact the project such as potential street improvements and/or utility connections. Ardurra will also review any mitigating factors that may be required as a result of the findings made part of the negative declaration and determine how best to implement these findings with minor impacts to the project. Ardurra’s proven management approach is outlined below and will be incorporated into this project to ensure quality control from start to finish.

POTENTIAL CONSTRUCTION CHALLENGES
Professional Design Support: During the design period, Ardurra will review and identify items that may be long lead items and establish anticipated lengths of time required for delivery. In addition, when possible, such as with specified play equipment, domestic vendors and fabricators will be favored in order to avoid potential delays experienced with non-domestic vendors. Special attention will be paid to the grading plan and minimal export will be encouraged, if possible, to reduce construction truck traffic. Ardurra will also provide input on the demolition plan and look at phasing options to reduce the impact to adjacent properties. Ardurra will also assist staff with the inclusion of specific language in the bid documents to ensure that contractors bidding this project are prequalified to do so.

Adjacent Properties: Arnold Cypress Park is currently surrounded by both single-family and multi-family homes to the east, west and south, and Kennedy High School lies to the north of the park across Crescent Avenue. Given the close proximity of adjacent properties as well as the high school, it will be imperative to incorporate a public relations strategy to keep all affected parties well informed of activities throughout the course of the project. During grading operations and throughout the course of construction, dust control measures will be required and strict enforcement maintained.

Given the high level of foot traffic generated by students at Kennedy High School, the ingress and egress of construction vehicles will be evaluated and located in the safest area. Traffic control requirements will be determined and strictly enforced throughout the construction phase.

Google Maps screenshot showing the proximity of Arnold Cypress Park within the residential community and Kennedy High School to the north Section 3: Project Understanding and Management Approach [ 28 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Prequalification Process: Ardurra's CM team is well-versed at conducting public bid prequalification processes. The team will blend the City’s RFQ process with the Labor Commissioner’s Model Questionnaire in order to conduct a prequalification process for the project that complies with Public Contract Code Section 20101.

Ardurra can also utilize recent examples of prequalification processes implemented on other public agency projects.

Safety: First and foremost, Ardurra always considers safety the most important issue on any construction project. Ardurra managers and inspectors are at a minimum 10-hour OSHA-certified. Our team will recommend key safety provisions to require the contractor to have competent safety personnel and site-specific safety programs employed on the project at all times and will monitor the contractor’s operations for compliance with the project safety requirements and requisite provisions of state and federal law.

Public Relations: The Ardurra team is empathetic to the motorists, residents, and businesses that are affected by construction operations, and we are well versed at mitigating such impacts throughout the construction process. We take a proactive approach to reach out to the public, resulting in the successful completion of public works improvement projects in close proximity to adjacent property owners. Strict adherence to allowable working hours, and noise and dust control requirements will be imperative to minimize impacts. The project team will intensify and continue the public relations effort as the start of construction nears and throughout the duration of the project.

Protocol and Communication: Timely and concise communications are essential to the successful completion of any construction project.

Protocol will be determined as appropriate for each project and maintained for the project duration. Communications and correspondence will be handled in a professional and respectful manner. Ardurra equips its CM team with the state-of-the-art in electronic management hardware and software, such that electronic documentation is utilized for as much of the required documentation as possible. The Ardurra CM team is well-versed in serving as the primary project contact, acting as the hub of communication with timely distribution of requisite correspondence and documentation to all respective stakeholders as applicable. In addition to time-tested and efficient construction administration and project controls procedures, documents, and programs, Ardurra offers the web-based collaboration of Procore. Procore is a widely used cloud-based construction software that maximizes the efficiency of managing construction projects while connecting project participants to critical project documents and real-time project data.

Quality Assurance/Quality Control (QA/QC) Management Process: Ardurra’s construction management quality assurance and quality control process starts with standardization of successful procedures. All projects utilize Ardurra’s standardized project electronic filing system, which is mirrored with a binder-based hard copy indexed system. Ardurra’s electronic filing system is a cloud-based system accessible real-time to all Ardurra project team members as well as its client as requested. Daily, weekly, and periodic correspondence, logs and reports are regularly reviewed for accuracy, up-to-date maintenance, aging, and escalation of issues, appropriateness, potential changes and/or claims and contract compliance.

Ardurra CM and inspection staff are equipped with the latest computer, software, smart phone, and internet field connectivity devices. Additionally, Ardurra provides its staff with all required tools, standards, and equipment. Ardurra employs both in-house and outsourced IT support services that continuously monitor and maintain its technology systems. Ardurra also offers its employees excellent benefits, encourages, and compensates for continuous education, resulting in a loyal team of professionals with longevity of service that are on top the latest industry trends. Ardurra’s approach and process for client construction contract quality assurance is detailed in the scope of services section.

Temporary and Permanent Utilities: Early and continuous coordination with utilities is imperative to ensure timely availability of temporary and permanent services. Ardurra has extensive experience assisting contractors in dealing with local utilities on complex utility coordination projects for other agencies as well as for utility agencies directly.

Our team is sensitive to the affects of construction operations to this community and will adhere to all requirements (such as noise and dust control as well as allowable working hours) to minimize impacts. (image: Google)
Section 3: Project Understanding and Management Approach [ 29 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Storm Water Pollution Prevention Plan (SWPPP): Bidders should be clearly apprised of the minimum requirements to mitigate stormwater during each phase of construction. It is recommended that a SWPPP be included in the bid package with corresponding separate bid items. The Ardurra team is well-versed at verifying best management practices (BMP) and monitoring establishment, maintenance, and modification of SWPPP measures on complex multi-phase projects. Additionally, the Ardurra team has acted as the data submitter for several local agencies, and implemented the Notice of Intent (NOI) application, uploading of various reports, and processing of the Notice of Termination (NOT).

Availability of Suitable Import: Significant delays can occur if suitable import material is not found within a reasonable distance from the site.

The specifications should be clear on the minimum radius from which the contractor should be required to import soils. Depending on the criteria of the soils report, screening or other processing requirements should be stipulated in the bid documents should local material not be required.

Minimum documentation requirements should also be detailed to qualify a contractor’s request for additional, non-compensable delay days if the availability of soils is purported to impact the schedule. The Ardurra CM team has extensive experience expediting suitable soils for earthwork operations on public projects.

Schedule: The ability of the construction manager to
monitor, track and control the contractor rests largely on the adequacy of the specifications and schedule requirements set forth to the contractor. Ardurra will recommend time tested language for incorporation into the bid documents to establish useful and fair scheduling requirements to keep a proactive look-ahead tool for the project.

Additionally, these requirements will include provisions to establish clear procedures for addressing only legitimate impacts to project time, thereby minimizing the need for delay related change orders, disputes, and their resulting costs.

Ardurra CM staff work proactively and cooperatively with contractors on a weekly basis to review and coordinate upcoming activities, drilling down on each activity to identify key quality assurance, safety, pedestrian control, submittals and/or documentation requirements necessary to successfully implement upcoming activities.

Substitutions and Submittals: Timely procurement of materials and equipment for any building construction project is imperative. By submitting its bid, the contractor is indicating it can successfully procure and construct the necessary components within the allotted time. Ardurra will recommend provisions to be added to the specifications to require that the contractor clearly identifies required lead times for all components of the project through a detailed, subsection by subsection submittal log, tied to the critical path schedule. Ardurra CM staff will assist the City to continuously monitor that the contractor submits each item in a timely manner and that the review and approval of each item is not unnecessarily delayed by the City and/or A/E review process. Responses will be clearly documented to note the contractor’s failure to meet specification requirements, thereby maintaining the contractor’s responsibility to meet the contract completion deadline. Any substitution requests will only be processed for consideration if the item is considered equal or a substantial savings can be identified with little or no degradation to the quality or function intended for the specified item.

Requests for Information (RFI): Ardurra will receive review, expedite, and process responses to contractor RFIs. Contractors typically utilize the RFI process to initiate changes on construction contracts. Ardurra staff reviews all RFIs and clearly documents those responses, clarifying that no additional cost or time will be considered. Should a response to an RFI appear to potentially impact cost or time, Ardurra will identify and recommend implementation of the most best cost and quality alternative to the City and expedite implementation with the contractor.

Contractor’s Representation: Consistent and competent representation by the contractor is a key factor in the successful completion of any building project. The public works industry in Southern California is a haven for contractors who act as brokers, constructing projects using a small management staff and all else by subcontractors. While some are successful at this approach, the contractor’s ability to maintain quality control is substantially lower in a low bid environment. Ardurra will recommend clear and specific requirements for inclusion into the bid documents to establish: 1) the minimum percentage of work required to be performed by the prime contractor; 2) documentation requirements for verification ID Task Name Duration Start Finish
1 Capital Improvement Projects 413 days Thu 10/7/21 Mon 5/8/23 2 Alta Vista Sewer Pump Station Project, Job No. 50300 280 days Mon 12/20/21 Fri 1/13/23 3 Pre‐Construction 10 days Mon 12/20/21 Mon 1/3/22
4 Construction 270 days Mon 1/3/22 Fri 1/13/23
5 Basin 2 Sewer Pump Out Station Upgrade Project & Harbor Patrol Dock Replacement Project, Job Nos. 50310 & 70690
280 days Mon 10/18/21 Fri 11/11/22
6 Pre‐Construction 10 days Mon 10/18/21 Mon 11/1/21
7 Construction 270 days Mon 11/1/21 Fri 11/11/22
8 Beryl Street Drainage and Street Improvements from Prospect Avenue to Flagler Lane Project, Job No. 41130
160 days Mon 6/6/22 Fri 1/13/23
9 Pre‐Construction 10 days Mon 6/6/22 Mon 6/20/22
10 Construction 150 days Mon 6/20/22 Fri 1/13/23
11 Citywide Curb Ramp Improvements 2021 Project, Job No. 40399 (Federal HUD B‐20‐MC‐06‐0528)
55 days Mon 10/18/21 Fri 12/31/21
12 Pre‐Construction 10 days Mon 10/18/21 Mon 11/1/21
13 Construction 45 days Mon 11/1/21 Fri 12/31/21
14 Citywide Drainage Improvement Projects ‐ Construction, Job No. 60260 110 days Mon 11/22/21 Fri 4/22/22 15 Pre‐Construction 10 days Mon 11/22/21 Mon 12/6/21
16 Construction 100 days Mon 12/6/21 Fri 4/22/22
17 Grant Avenue Signal Improvements Project, Job No. 41090 110 days Mon 10/11/21 Fri 3/11/22 18 Pre‐Construction 10 days Mon 10/11/21 Mon 10/25/21
19 Construction 100 days Mon 10/25/21 Fri 3/11/22
20 Manhattan Beach Boulevard Resurfacing ‐ Aviation to Inglewood, Job No. 41190 110 days Mon 6/6/22 Fri 11/4/22 21 Pre‐Construction 10 days Mon 6/6/22 Mon 6/20/22
22 Construction 100 days Mon 6/20/22 Fri 11/4/22
23 North Redondo Beach Bikeway (NRBB) Extension ‐ Felton Lane to Inglewood Avenue90 days Tue 12/6/22 Mon 4/10/23 24 Pre‐Construction 10 days Tue 12/6/22 Tue 12/20/22
25 Construction 80 days Tue 12/20/22 Mon 4/10/23
26 Pier Restroom Improvements Project, Job No. 70640 (at Monstad Pier, between the Redondo Coffee Shop/ Bait and Table Shop and Pacific Restaurant) 80 days Thu 10/7/21 Wed 1/26/22
27 Pre‐Construction 10 days Thu 10/7/21 Thu 10/21/21
28 Construction 70 days Thu 10/21/21 Wed 1/26/22
29 Residential Street Rehabilitation Project ‐ Cycle 2, Phase 3, Job No. 40190 110 days Mon 3/7/22 Fri 8/5/22 30 Pre‐Construction 10 days Mon 3/7/22 Mon 3/21/22
31 Construction 100 days Mon 3/21/22 Fri 8/5/22
32 Torrance Boulevard Resurfacing from Torrance Circle to Prospect Avenue Job No. 41230
110 days Tue 12/6/22 Mon 5/8/23
33 Pre‐Construction 10 days Tue 12/6/22 Tue 12/20/22
34 Construction 100 days Tue 12/20/22 Mon 5/8/23
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 City of Redondo Beach
Construction Management and Inspection Services for Various Capital Improvement Program Projects

Page 1 of 1 ends

Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction
Construction
Pre-Construction Phase Services include traffic control plan review; pre-construction meeting; long lead time items submittal review; labor compliance; agency coordination; public outreach; and materials testing.

Construction Phase Services include the contractor notice to proceed; long lead time items procurement; mobilization; notifications; and dig alerts and potholing.

Our CM is expert at monitoring schedule requirements.

Section 3: Project Understanding and Management Approach [ 30 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation of the amount of work to be subcontracted; 3) requirements for the contractor’s full-time project management, safety officer and superintendence throughout the project; and 4) minimum qualifications for the contractor’s project manager, safety officer and superintendent. Ardurra CM staff work proactively and cooperatively with contractor staff to monitor proper supervision during construction operations.

Change Management/Claims Resolution: Ardurra will implement its time-tested claims management process to minimize changes to the project and avoid claims such that the project can be quickly and successfully closed out. The basis for Ardurra procedures is a well-organized documentation system, a keen understanding of the construction process, exceptionally qualified staff, and fair and firm negotiations. The Ardurra CM team will not defer difficult issues and will process only change issues that have been analyzed and determined to have merit. Those items will only be recommended for consideration when the most reasonable cost and time have been negotiated and all alternatives to avoid the impact have been exhausted and/or resolved.

Contracts for Public Works Inspection: For contracts involving public works inspection services, Ardurra requires the awarding public agency to complete DIR form PWC-100 solely for Ardurra Group, Inc. as the Prime Contractor specific to the awarded contract name and amount.

APPROACH
The Ardurra construction management and inspection approach and methodology are designed to safely deliver a high-quality project, on time and within budget. The firm uses proven methods for performing the multitude of tasks that dictate the success of a construction project.

The Ardurra team fosters productive collaboration and cooperation among all stakeholders, from the contractor to local businesses to residents.

Potential challenges are proactively identified and addressed before they become significant budget issues and schedule delays. CM and inspection services are delivered by proven professionals with solid track records of success. By utilizing Ardurra, clients are kept informed on a real-time basis and know that Ardurra’s guiding principal is to always act in its client's best interest.

Pre-Bid Phase
Bidability/Constructability: The Ardurra CM team has extensive experience optimizing project bid documents for public agencies. Conducting a bidability/constructability review of construction bid documents typically results in savings substantially exceeding the cost of the review services.

Public bid documents consist of many separate sections, plans, permits, and reference standards. Ardurra is very well-versed in reviewing public bid documents to identify potential conflicts, omissions and/or recommendations for alternative methods or products to achieve similar to better results at equivalent or less cost. The Ardurra constructability/bidability review methodology is further detailed in the scope of services section below.
aConstructability Review of Bid Documents
Constructability reviews will be conducted as directed by the City ( 60% and 90% design phases for the project). A punch list of comments and recommendations will be submitted to the City for consideration and implementation with the project architect.

The CM team will review the plans for bidability and constructability and identify potential value engineering solutions, ambiguities, conflicts and/or omissions apparent during its review. The bid documents and technical specifications will also be reviewed for potential duplication/ overlap of clauses, conflicts, proper placement of critical requirements within the order and precedence of documents. Ardurra will also recommend key contract provisions to provide the necessary controls and remedies for the City to maintain a proactive approach on the project, as noted in the approach section above.

The CM constructability/bidability review typically involves the following:
y Checking pothole data and as-built underground and overhead utility information against proposed design and assisting the design team in resolving any resulting conflicts.
y Identifying and implementing quantity measurement methodologies to obtain the most efficient and accurate field measurements during construction.
y Comparing plan notes with standard and special revisions, eliminating and/or removing any conflicts/overlapping requirements. y Check quantities.

Section 3: Project Understanding and Management Approach [ 31 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation y Check construction notes and proposed improvements against bid items and bid item descriptions/identify and resolve apparent inconsistencies and/or gaps.
y Compare proposed removals with proposed improvements and existing field conditions y Recommend special provisions language for project-specific and time-tested public contract remedies. y Recommend order and precedence revisions and/or standard specification modification, as applicable. y Recommend bid item allowances, alternates and minimum performance requirements, contractor deferred design items, e.g., detailed traffic control phases, pedestrian safety measures, public relations activities, SWPPP/NOI development and processing, etc. y Establish bid evaluation criteria. Prepare Request for Bid documents. y Project Phasing: It is imperative that the bidders have complete and clear disclosure of any phasing requirements to maintain City and/ or other stakeholder operations throughout construction. In order to minimize the potential for impacts and/or claims, minimum phasing plans or narrative requirements will be recommended for inclusion in the bid documents and a separate bid line item(s) be established to identify the adequacy of the bidders’ intent to facilitate the necessary phasing requirements. Additionally, separate sub-milestones can be established (with separately calculated liquidated damages attached) to ensure that the phases are properly carried out to ensure the continuous and unobstructed use of critical existing operations (if any). Ardurra has extensive experience working with contractors to facilitate critical phasing requirements on complex projects. y Project Scoping: Check for clear identification of project limits. For unit price contracts with budgetary limits (e.g., projects with indefinite paving rehabilitation areas) methodology to maintain quantities delivered within the budget program will be developed and implemented into the bid documents and project procedures.

Bid Phase Assistance
aCoordinate with the City Clerk’s Office and the Public Works Department to establish advertising dates, arrange pre-bid meeting, and the bid opening date.
aParticipate in pre-bid meeting to assist with answering bidder questions. aEnsure that the project is advertised in appropriate publications and online contractor bid announcement services. Directly contact contractors specializing in this type of construction to encourage their participation. aAssist with coordination with the City and other affected agencies/agencies having jurisdiction, as necessary. aAssist with public relations/public outreach activities as needed. aAssist with the development of responses to bidder questions during bidding period. aConduct reference checks on the low bidder.
aCheck state licenses of bidder and subs.
aReview insurance and bonds for compliance with contract documents. aCompile bid analysis:
y Tabulate all bids with detailed breakdown with comparison to latest construction estimate. y Identify apparent unbalancing within bids.
y Identify apparent missing items.
y Assist with addressing minor omissions or administrative issues as approved by the City. y Repeat above steps for next bidder if as-bid numerically low bidder appears to be unresponsive. aAssist with compiling recommendation to award to the successful bidder. y Make recommendation for confirmation of lowest responsive and responsible bidder with detailed basis, particularly if the as-bid numerically low bidder is not recommended.
aAssist in preparation of staff reports for City Council contract awards.

Section 3: Project Understanding and Management Approach [ 32 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Contract Award/Execution
aAttend City Council meeting for award of the construction contract. aAssist with coordinating contractor documentation requirements to support execution of contract. aAssist with expediting contract execution by the parties. aAssist with coordination with the City and other affected agencies/agencies having jurisdiction, as necessary.

Construction Management Services
Ardurra specializes in delivering construction management services for the successful and efficient completion of public agency projects. We deploy time-tested procedures and best management practices for the most vital project elements:
y Safety
y Public outreach
y Schedule
y Measurement and payment
y Change management
y Claims avoidance
y Budget and cash flow
y Utility coordination
y Documentation protocol
and communication
y Quality assurance
y Labor compliance
y Project commissioning,
acceptance, and closeout
Not only is Ardurra successful at delivering CM and inspection services, but our CM and inspection professionals are considered leaders in the industry. They are frequently engaged to train public works staff and develop or improve standardized public works department systems and procedures that incorporate industry best practices across capital project and development permit delivery.

Quality Assurance/Quality Control Management
Our strategic approach to a quality product:
aUnderstand the Project: Quality control starts at the beginning of the project through planning and controls. At the forefront of the project, our construction manager will discuss the proposed scope of work, projected schedule, and estimated costs in detail with the City to ensure that the project scope and goals are fully understood from the onset.
aThe Right People for the Project: Our project team has extensive, relevant experience in completing civil engineering projects in cities throughout the Counties of Los Angeles and Orange. The team that has been formed will hit the ground running, delivering on schedule and within budget.
aCommunication: Our construction manager has an excellent track record communicating with clients, subconsultants, staff, and stakeholders. Frequent communication and tracking of project progress are integral to his approach to every project.
aSchedule Control: We have project management tools that forecast staff requirements and labor allocations three months in advance.

Section 3: Project Understanding and Management Approach [ 33 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Preconstruction Conference
Ardurra will coordinate and conduct the preconstruction meeting. This will include notification to contractor, utility agencies, and other stakeholders, and prepare the meeting agenda and minutes.

The agenda and minutes typically include the following items:
y Introductions of key personnel
y City responsibilities
y Safety
y Project overview
y Confirmation of fully executed contract documents and Notice to Proceed
y Establishment of contract time and completion date
y Review of Working Day definition and holiday schedule y Common overall project goals will be identified
y Chain of communication and key contacts
y Public relations
y The scope will be discussed and clearly defined
y Critical design elements, schedule, and cost factors will be discussed
y Experience and key roles in the project will be discussed y Past project experiences will be discussed to identify potential pitfalls
y Jurisdictional agencies and the contractor
y Discussion of master schedule
y Subcontracts
y Integration of utility coordination activities into schedule y Documentation and tracking controls
y Change order procedures
y Scope, schedule, and cost change administration, notification requirements and controls
y Submittal and RFI process
y Identify long lead and any substitution and/or equal items y Inspection and testing – review call-out requirements and deputy/special and testing requirements
y Review survey for consistency with the design
y Progress payment procedures
y Labor compliance
y Rights-of-way
y Easements and special access considerations
y Placement of signs
y Questions and answers
y Action item assignments
Ardurra considers the preconstruction meeting as Progress Meeting No.1. All items discussed are designated as “open” or “closed.” All open items are carried forward to subsequent progress meetings until resolved and closed. Action items are assigned a specific responsible party and a deadline for resolution. Each progress meeting is clearly documented with detailed minutes and distributed to all attendees and affected coordination parties. Ardurra will typically conduct or, at a minimum, participate in all site meetings. Preconstruction meeting and site meeting minutes will be distributed via email to meeting participants and to courtesy recipients identified by the City.

Construction Progress/Coordination Meetings
The following meetings will be held on site, as required:
aPeriodic project team/stakeholder meetings will focus on the following:
y Progress during the period
y Major decisions made
y Planned vs. actual schedule
y Upcoming work schedule
y Current or unresolved problems
y Anticipated or pending change orders
y Impacts of problems or change orders on schedule and budget y Discussion of new goals
y Planned vs. actual budget analysis
y Scheduled concurrent with a weekly meeting to save time and cost Example Preconstruction Meeting Minutes
Section 3: Project Understanding and Management Approach [ 34 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation aWeekly Progress Meetings – with typical agenda including:
y Contractor’s detailed four-week look-ahead schedule
y Progress and major decisions during the last week
y Update of unresolved items from previous meetings
y Status of submittals and change orders
aSpecial meetings to discuss important/urgent issues or which require detailed discussion or review of plans and specifications
Safe Conditions
Ardurra will monitor project work and adjacent areas for unsafe conditions, promptly require corrective measures to be addressed by the contractor in compliance with the contract documents and report such issues and corrective measures taken to the City. One of the most pervasive job hazards across all public works projects is construction adjacent to live traffic lanes. Ardurra inspectors are intimately familiar with monitoring and enforcing proper traffic controls per the WATCH handbook, MUTCD and/or project-specific traffic control/traffic handling/detour plans. Inspectors drive and/or walk the project limits at the start, during, and before leaving the site each day to monitor proper and/or necessary corrections to the required traffic control measures.

Field Public Relations
Ardurra’s construction manager and inspector will take a lead role to address public relations concerns. All inquiries and issues will be listened to and documented with accurate contact information for prompt follow-up. Feasible mitigation and public relations measures to issues identified will be implemented immediately to minimize impacts to the surrounding public uses.

The construction manager and inspector will work with businesses, motorists, pedestrians, cyclists, and residents to address issues expeditiously for resolution in the field whenever feasible. Any issues that cannot be immediately addressed in the field will be communicated through appropriate protocols with recommendations for the most efficient resolution. Ardurra will expedite implementation of the solution that serves the project’s best interests, as mutually determined with the City, contractor, and affected parties.

Office Engineering
Office engineering duties will include attending meetings to take notes; preparing meeting minutes; updating the weekly statement of working days; tracking and logging all preliminary notices, stop notices, releases, correspondence, submittals and RFIs; quality control of inspection reports; prevailing wage inspection labor compliance administration; and change management documentation. Office engineers may also be asked to assist with the review and analysis of schedule updates, RFIs, submittals and cost estimates.

Quality Assurance
Ardurra will enforce the quality assurance plan, in conformance with the City’s quality assurance manual, or as developed by Ardurra and the City for the specific needs of the project. Ardurra will perform and/or coordinate QA/QC activities daily and review activities as they happen, to make sure that QA/QC procedures are followed and deficiencies resolved in a timely and efficient manner. Ardurra inspector(s) will visit the site on a part-time or full-time basis, as required by the City, during the normal working hours and when critical activities require to verify construction progress and to verify that all work conforms to contract requirements. Deputy and special inspection and materials sampling and testing will be coordinated and provided as required by the final plans and specifications. The Ardurra team will monitor testing services, track documentation and review testing results. Ardurra CM staff will also review test reports (certificates of compliance) submitted by others to substantiate compliance and ensure that certificates of compliance or source release tags are furnished by the contractor along with the applicable delivered materials at the project site. When necessary, corrective measures will be implemented and re-inspected/re-tested to verify acceptable completion. Ardurra will reject work that does not conform to the requirements of the contract documents and will promptly report unacceptable work to the City and contractor. Rejected work will be thoroughly documented, photographed, and tracked until repaired or replaced to the satisfaction of the City.

Our team will monitor project work and
adjacent areas for unsafe conditions
Section 3: Project Understanding and Management Approach [ 35 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Inspection Services
Inspection services will include, but are not limited to, the tasks listed below and will be performed daily. aReview and familiarize contract documents.
aParticipate in preconstruction meetings, other meetings, and conferences, as required. aBe present at all times, including weekends (if necessary), when construction is in progress. aReview and in conjunction with the City’s project manager, enforce the contractor’s proposed construction schedule. aMonitor and document the contractor’s compliance with plans, specifications, and referenced standards. aAssist in the review of “submittals” required by the specifications. aAssist with coordination between City’s project manager, contractor, and any other entities that may be involved. aReview contractor performance and expedite corrective measures for discrepancies as they occur. aCoordinate surveys and staking, furnishing grades as necessary to the contractor, and check all structure-related surveys. aVerify grades, staking and marks set by the contractor for structures. aCoordinate and provide assistance and direction to technicians performing material tests. Measure the work-in-place to verify quantities. aClosely monitor testing results and require contractor to take corrective actions if results are unsatisfactory. aAssist the City with public outreach. Document and respond to public inquiries, monitor, and document compliance with working hours, noise levels, and dust mitigation requirement.
aReview and make recommendations for the processing of payment requests. aAssist with the consideration, negotiation, and processing of change orders. aPrepare daily inspection reports (daily activity report, weekly statement of working days) including photographs.
aMeasure and track quantities of satisfactorily completed improvements. aMonitor contractor’s implementation of approved traffic control measures. Drive routes with active detours and/or lane closures daily to confirm or require correction in compliance with approved traffic control plans, WATCH Manual, Manual on Uniform Traffic Control Devices (MUTCD) and/or Caltrans Traffic Control Manual, as applicable. aReview items requiring corrective action with the contractor and the City and develop punch list items and monitor corrections made.
aIssue field correction notices and respond to RFIs.
aPrepare redline set of as-built plans.
aCoordinate inspection activities with other jurisdictions, if applicable. aStrictly enforce requirements for health and public safety on the project. aPerform inspection for line and grade, earthwork, grading, excavation, backfilling of utility trenches, asphalt paving, concrete form work reinforcement, and other related work. aLandscape architect review and approval of materials for all landscape features on the project (plant/tree selection, product submittal and sample reviews, irrigation installation inspection and coverage test, proper installation and plantings and maintenance). aMaintain a redline set of as-built (record) information. aPrepare project punch list at substantial completion and follow-up.

Example Daily Report
Section 3: Project Understanding and Management Approach [ 36 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Traffic Management Coordination
Ardurra will oversee proper implementation of the traffic control plans by the contractor and require corrections and diligent maintenance when required. Ardurra will coordinate review of any traffic control plans required to address special situations and monitor the contractor’s compliance with the Traffic Handling Plans, the MUTCD, or as otherwise provided for in the specifications and in accordance with Section 16.16 of the LAPM. Apparent conflicts with adjacent or nearby projects will be addressed and coordinated. The contractor will be required to clearly correlate traffic control phasing in the CPM schedule work breakdown structure. Traffic control will be a standard discussion and coordination item at weekly progress meetings.

Daily Construction Observation Reports
Ardurra and/or the deputy/specialty soils and materials inspectors will compile daily observation reports documenting the contractor’s workforce, material and equipment used, a summary of construction activities, field problems, disputes or claims, resolutions of issues, and directions given to the contractor.

Completed daily reports will be transmitted to the City on a weekly basis.

Photographs
Ardurra CM and inspection staff prepare and maintain an electronic photo journal documenting the construction progress. Photos shall be taken before construction begins, during construction, and upon completion of the project.

Weekly Statement of Working Days
The Ardurra construction manager will prepare a weekly statement of working days (WSWD), in conformance with documenting the construction progress, time of completion, delays and time extensions, and submit to the contractor and the City on a weekly basis. The WSWD is typically discussed and agreed upon at each progress meeting and transmitted as an attachment to the minutes.

Soils/Materials Testing
QA/QC: Ardurra will implement the City’s established Quality Assurance Plan (QAP). Ardurra will coordinate QA/QC activities daily and review activities as they happen to make sure that QA/QC procedures are followed and deficiencies resolved in a timely and efficient manner.

Testing and Observations: The CM and inspection team will coordinate laboratory, jobsite, and offsite/source inspection and testing of construction materials and required observations per the QAP, construction documents, construction codes, and jurisdictional agencies. The CM and inspection team will monitor testing services, track documentation, and record testing results in weekly construction progress meetings. When necessary, corrective measures will be implemented and re-inspected to verify acceptable completion.

Utility Coordination
Ardurra will assist the contractor in dealing with local utilities to coordinate and expedite temporary and permanent utility installations, utility relocations and utility access structure adjustments.

Our team is knowledgeable
of the Caltrans LAPM
Example Daily Report with Photos
[ 37 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Section 3: Project Understanding and Management Approach Periodic Progress Reports
Ardurra will cooperatively develop, with the project stakeholders, the format and information necessary for reports that may be required during the construction phase. These reports are typically compiled every other month and include the following information:
aSummarized report of construction activities including significant events and accomplished goals aConstruction observation reports
aDescription of progress with photos to enhance the descriptions aDescription of equipment used
aComparison of actual vs. planned progress, in narrative form and bar graph form aThe latest detailed 4-week look-ahead schedule submitted by the contractor and reviewed by the construction manager and appropriate stakeholders
aIdentification and discussion of current problems or pending change orders and actions taken or planned to resolve such issues aA discussion of new short- and long-term goals for the project aA comparison of actual vs. planned budget expenditures aA master trend log detailing potential and approved changes aReport of progress payments made to date and invoices in process aLabor compliance reports for contractor and subcontractor employees (if required) aA QA/QC status section
aAn analysis of change order impacts or potential problems on schedule and budget Submittal Processing
The construction manager will track all correspondence and submittals on this project. Ardurra will receive all contractor submittals and review them for completeness and general conformance with the contract documents. All shop drawings, samples and other submittals received from the contractor will be logged in and routed to the City and the architect.

Responses will be logged and transmitted to the contractor.

Submittals will be tracked throughout the project to ensure timely response in order to avoid contractor claims for delay.

All submittals will be expedited utilizing electronic delivery whenever possible (except for shop drawings, large format documents). Additionally, Ardurra will recommend key
contractual requirements for the contractor to clearly indicate submittal processing requirements in the project schedule.

Submittal content and review comments will be monitored to identify potential impacts to quality, cost, or schedule, with recommended alternatives and/or solutions.

Materials Control
The CM team will establish a materials receiving process on site such that all materials deliveries are accompanied by proper delivery documentation satisfactory to confirm that all products comply with the plans and specifications, approved submittals and bear the requisite certificate of compliance for source, product type and “Buy America,” as applicable. Materials delivered to the site lacking proper documentation will be flagged as unacceptable and not allowed to be incorporated into the work until proper documentation is provided and verified.

Requests for Information
Upon receipt, the CM team will log, distribute, and respond to each RFI as required. It is anticipated that most will be handled upon receipt. However, if the design engineer or City staff are required to answer questions, the project manager will coordinate a timely resolution. Ardurra will identify potential impacts to cost or time that may result due to issues identified in RFIs, with recommended alternatives or solutions to mitigate the potential impacts.

Example Submittals Log
[ 38 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Documentation Interpretation and Technical Assistance
Ardurra staff coordinates and expedites between the contractor, design team, and City staff to clarify any questions for interpretation of the construction documents. Timely, firm, and fair determinations will be processed to minimize cost and time impacts to the project.

Problem/Solutions
The Ardurra proactive approach serves to anticipate and expeditiously resolve field problems. Our team is well trained in problem solving. All issues are processed with a sense of urgency and presented to the City with suggested alternatives, cost and schedule impacts and recommended solutions. The CM team will quickly implement the alternative that best suits the interests of the project and the City. Ardurra will effectively and expeditiously communicate with City staff, design consultants, and the contractor, as applicable, to identify conflicts, construction problems, and coordination issues, and will obtain the needed action and response to submittals, RFIs, and supplemental design documents.

Written Instructions
Ardurra will issue written instructions (via email, transmittal letter, field speed memo) to the contractor regarding routine matters and/or follow-up of verbal instructions as necessary to properly document project issues.

Document Tracking System
Complete and current project files shall be kept at the job site, or at a location agreeable to the City, and shall be available to the City at all times. These files will consist of the contract, correspondence relating to or modifying the contract, proposal requests, clarifications, permits, logs, reports, RFIs, field orders, change orders, claims inspection reports and test reports. The Ardurra project controls process includes a detailed file indexing system for all project hard files. Ardurra has already developed customized forms, a reports database structure, and work breakdown structure well suited for typical public works projects. We will adapt our system to the specific needs of the project to monitor, track, and control the project. This detailed tracking system will enable us to provide an accurate assessment of the progress to the City with recommendations to maintain or improve adherence to the approved project schedule.

The table below illustrates the typical deliverables implemented on Ardurra CM projects:

ITEM METHOD FREQUENCY
Correspondence Outlook/Speed Memos/Formal Letters Daily/Continuous/As Needed Project Documentation Procore Daily/Continuous
Submittals Procore Daily, as required; 72-hour turnaround RFIs Procore Daily, as required; 72-hour turnaround
Progress Payments Excel Measurements – Daily;
Quantity Measurement Report – Monthly
Inspection Reports Adobe Fillable Forms or Procore Daily Weekly Statements of Working Days Excel Weekly
SWPPP/BMP Compliance Excel Weekly
Public Relations Inquiries Log – Excel Daily, as required Photo and Video Procore/Explorer Video Pre-Project, Photos Daily Progress Reports Word/Publisher Monthly and as required Project Contacts Outlook Daily
Project Calendar Outlook Daily
Meetings Word and Outlook/Zoom Weekly and as required
Section 3: Project Understanding and Management Approach Example Field Speed Memo
Section 3: Project Understanding and Management Approach [ 39 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Schedule Review
Ardurra is intimately familiar with mainstream scheduling software utilized by the public works contracting industry, including, but not limited to Primavera P3®, Suretrak® and Microsoft Project®. The Ardurra construction manager will review the baseline construction schedule, including activity sequences and duration, schedule of submittals and schedule of delivery for products with long lead times. The CM team will evaluate the baseline project schedule for the following:
aConsistency with the contract schedule (completion within the contract time) aAccurate start dates, completion dates, other dates detailed in the contract aAny impacts of weather and change orders
aSufficient detail, including submittal process and procurement requirements aSequence of construction and correct schedule logic
aIdentification of the critical path and project float
The schedule will not be recommended for approval as the baseline until all discrepancies are resolved.

Schedule Control
During the progress of construction, the Ardurra CM team will compare the contractor’s monthly schedule updates to the baseline schedule and any approved time extensions, note any shortcomings, and monitor and track corrections by the contractor to keep the project schedule on time. A four-week look-ahead will be required from the contractor, updated weekly, and presented at the weekly construction progress meetings.

This tool will keep the entire team looking one month ahead of the project and will facilitate proactive handling of project activities and issues. If necessary, Ardurra will negotiate time extensions due to change orders or other delays.

SWPPP
Ardurra CM and inspection staff will enforce all provisions of the Storm Water Pollution Prevention Plan and/or other requisite requirements set forth in the specifications. Ardurra CM staff is well versed in SWPPP monitoring through provision of dedicated services for oversight of developers and contractors on behalf of several public agencies. At a minimum SWPPP requirements will be monitored and a specific SWPPP checklist will be compiled. Any deficiencies noted will be addressed with the contractor for immediate remedy. Upon a weather report of expecting rain, a site walk will be conducted to ensure that SWPPP measures are in place and well maintained. Additionally, if desired by the City, the Ardurra team can be assigned as the data submitter for the project to implement the NOI application, uploading of various reports, and processing of the NOT on the SMART website.

Change Management
Ardurra will establish, implement, and coordinate systems for consideration, negotiation, processing, and implementation of change orders. Each issue, which is identified as a potential change to the design, scope, cost, or contract time will generate a uniquely numbered potential change order (PCO). The construction manager will determine whether or not a change notice should be considered. The plans and specifications will be reviewed against the change notice. If the issue does not appear to be included in the plans or specifications, the construction manager will negotiate the scope and cost for the most efficient, cost and quality appropriate solution with the contractor and City. Any credits for work deleted as a result of the change will be required at this time as well. The construction manager will maintain a trend log, listing potential changes as identified, either formally or informally. This trend log shall be used such that potential change items are not overlooked or deferred until the end of the job. Ardurra will prepare independent cost estimates as required for contract change orders. Upon approval by the City, the construction manager will prepare, log and process change orders for full execution, and administer their implementation. Once fully executed, the CM team will expedite and review the timely completion of the work and coordinate inclusion of the change order in the appropriate payment application.

Example 4-Week Look-Ahead Schedule
Section 3: Project Understanding and Management Approach [ 40 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Claims Avoidance
Ardurra will assist the City with claims filed by the contractor in accordance with the guidelines set forth by the general specifications, and the standard specifications. Ardurra is well-versed at negotiating and resolving claims amicably between contractors and public agencies. Should a claim require work in addition to Ardurra’s contract, Ardurra will be available on a time-and-materials basis if desired by the City, including assistance with processing required forms and coordinating with the DLAE, and processing additional funding if applicable. The provision of any legal advice or services is specifically excluded.

Daily Extra Work Reports
The Ardurra CM and inspection team will verify and sign contractor’s daily extra work reports documenting force account (time and materials) work.

In particular, Ardurra will monitor that only appropriate worker classifications necessary for approved time and materials work is included on extra work reports. Any inappropriate workforce and/or equipment charges will be promptly rejected and removed from extra work reports.

Progress Payment Processing
A cost control system, based on the contractor's schedule of values, approved change orders and the contract amount shall be developed and implemented to monitor progress costs. Monthly cost reports will be submitted to the City as a component of the monthly progress report.

Ardurra will establish quantity measurement forms and methods for each bid item. The construction manager will coordinate with the City’s inspector and Ardurra’s alternate inspectors to provide detailed quantity measurements for work as it is installed. Quantity measurements will include the specific location placed, field measurement and quantity calculation in accordance with the specified measurement and payment provision for each bid item, and any backup documentation such as certificate of compliance, materials delivery ticket, as appropriate for the item measured. The contractor’s representative will be required to acknowledge daily quantities measured, to eliminate the need for post-installation revisits of bid item quantities. All quantities will be properly documented on inspector daily reports and tied to a quantity measurement report that will be certified by the inspector, construction manager, and City representative.

The Ardurra CM and inspection team will review the payment applications submitted by the contractor and determine
whether the amount requested reflects the progress of
the contractor's work. Appropriate adjustments to each
payment application will be required by the contractor.

When the payment application is acceptable and all backup documentation is verified (certified payrolls, lien releases), Ardurra will prepare and forward to the City a progress payment report. The report shall state the total contract price, payments to date, current payment requested, retainage and actual amounts owed for the current period. The Ardurra team is experienced with evaluating complex pay applications. It is critical to the City’s best interest that payment application review be performed accurately and prudently to maintain the prime and subcontractor incentives to perform on the projects.

Cashflow Management (Preliminary Notices, Releases and Stop Notices) Ardurra recognizes that the diligent monitoring and tracking of preliminary notices, conditional and unconditional releases is an important component of public construction management, enables the team to stay abreast of the construction contract cash flow and provides for excellent documentation of prompt payment as required by federal funding.

The construction manager will maintain a detailed log of preliminary notices and require conditional and unconditional releases from the contractor for all first-tier subcontractors and any-tier subcontractors that submit a preliminary notice.

Example Certified Payroll Log
Section 3: Project Understanding and Management Approach [ 41 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation Proactive monitoring of releases typically minimizes the incidences of stop notices. Should any stop notices be received, Ardurra will work proactively with the contractor to address release of the stop notice and withhold 150% of the stop notice amount from progress and/or retention payments until the proper unconditional release is documented. aArdurra’s inspector will conduct employee interviews in conformance with the Davis-Bacon Act and/or other funding agency requirements. aCertified payrolls and fringe benefit statements will be received and logged for each contractor and subcontractor on the project. aCertified payrolls will be reviewed to confirm proper wages and benefits are paid to each employee and classification. aCertified payrolls will be compared to inspector daily reports to confirm each employee, number of hours, and appropriate classification observed on site was paid the proper amount.
aCertified payrolls will be compared against employee interviews. aAny discrepancies identified will be documented and coordinated with the appropriate contractor or subcontractor through the appropriate resolution via the appropriate restitution paid to the employee, supplemental or corrected certified payroll submittal or supplemental daily report entries to correct mis-recorded entries.
aListed DBE firm’s certificate information, subcontracted work items and amounts and DBE certificate expiration dates will be logged at the outset of the project and reviewed with the project team. aThe Ardurra inspector daily reports will indicate when DBE subcontractors are utilized.

Plans, Specifications, and As-Builts
Ardurra will periodically review the contractor’s as-built updates on the approved job plan set, identify missing items, and require the contractor to keep as-built records up-to-date throughout the project. Ardurra CM staff keeps its own set of as-built plans that will note the location of subsurface utilities encountered and/or installed, identify where any design or field changes were required (utilizing the corresponding RFI and/ or change order numbers), and note the location of critical building components that are covered by finish work. At the end of the project, the final as-built plans are submitted to the City.

Closeout Documents
Ardurra staff will enforce the provisions of the specifications to require and expedite the contractor to submit well-coordinated operations and maintenance manuals, warranties and guarantees, bonds, extra stock and/or other items required by the contract documents such that a timely closeout of the project is implemented. Ardurra will perform closeout duties including final organization of project files and submit to the City for final approval and assist with the filing of the Notice of Completion and Release of Retention.

Pre-Final Inspection
The construction manager and inspector will coordinate with appropriate project stakeholders, perform the final job walk, and prepare the punch list (deficiency list). Ardurra will coordinate, expedite, and observe completion of required corrections.

Final Inspection
Satisfactory completion of all punch list items is verified before Ardurra recommends processing of the Notice of Completion. Ardurra is noted for attention to detail. Not only have we excelled at closing out our own projects, but we have been requested to and successfully closed out problem city projects in which our services were not initially utilized.

Upon completion of the punch list and final sign off by all project stakeholders, Ardurra will make recommendation to the City regarding the contractor’s final progress payment request and prepare the final progress payment report for submission to the City.

Delivery of As-Builts and Closeout Documents
Ardurra will periodically review the contractor’s as-built updates on the approved job plan set, identify missing items, and require the contractor to keep as-built records up-to-date throughout the project as required by the specifications. Ardurra will review the contractor's submittal of “as-constructed” conditions and compare this submittal to Ardurra’s own documentation. Discrepancies will be discussed, resolved, and recorded.

Completed “as-constructed” plans will be submitted to the City.

Section 3: Project Understanding and Management Approach [ 42 ] City of Cypress Public Works Department | 02-25-2022 Construction Management for Arnold Cypress Park Rehabilitation The Ardurra team will enforce the provisions of the specifications to require the contractor to submit well-coordinated operations and maintenance manuals, warranties and guarantees, bonds, extra stock, and/or other items required by the contract documents such that a timely closeout of the project is implemented.

Ardurra will perform closeout duties, including final organization of project files, and submit to the City for final approval. Ardurra will also assist with the filing of the Notice of Completion and Release of Retention.

Post Construction Support
Ardurra can assist the City with resolution of post-construction issues such as user department inquiries and issues, resolution of stop notices or notices from the labor commissioner on a time-and-materials basis upon the City’s request.

We look forward to teaming with the City and community of Cypress to assist with delivery of this important park improvement project.

Arnold Cypress Park Conceptual Plan provided in the RFP WWW.ARDURRA.COM

SOUTHERN CALIFORNIA OFFICES
Bakersfield
1401 Commercial Way, Suite 100
Bakersfield, CA 93309
661.529.2190
Newport Beach
3737 Birch St., Suite 250
Newport Beach, CA 92660
949.428.1500
Poway
14271 Danielson Street
Poway, CA 92064
858.413.2400
El Segundo
1960 E. Grand Ave., Suite 300
El Segundo, CA 90245
310.359.1203
Oceanside
301 Mission Ave., Suite 202
Oceanside, CA 92054
760.529.0795
Temecula
41593 Winchester Rd., Suite 110
Temecula, CA 92590
951.396.4980

PROPOSAL

CONSTRUCTION MANAGEMENT SERVICES

FOR ARNOLD CYPRESS PARK REHABILITATION

CITY OF CYPRESS
FEBRUARY 25, 2022
27372 Calle Arroyo / San Juan Capistrano, CA 92675 / 949.450.2525 Construction Management for Arnold Cypress Park Rehabilitation i Cover Letter
February 25, 2022
Nick Mangkalakiri, P.E.

Assistant City Engineer
City of Cypress
5275 Orange Avenue
Cypress, California 90630
Subject: Construction Management Services for Arnold Cypress Park Rehabilitation Dear Mr. Mangkalakiri,
We appreciate the opportunity to submit our proposal for the subject project. Dudek has managed and inspected the construction of numerous park projects throughout southern California over the past 35 years. We recently managed and inspected an $11.0 million dollar sports park for the City of Fontana that has similar elements as the City’s Arnold Cypress Park. Aside from that project, Dudek also assisted on the City of Carlsbad’s Alga Norte Park Project, a $30 million project that also contained similar facilities as this project. Dudek performed a thorough constructability review of the Alga Norte Park project and found several issues that if left uncorrected, would have resulted in numerous change orders.

The project principal for this project is Mr. George Litzinger who will be supported by the Dudek team as required.

He will implement a proactive management approach during constructability reviews and will focus on avoiding project delays, meeting budgets, and achieving successful completion of the project without claims.

Should you have any questions or require additional information during the proposal evaluation process, please contact me on my cell at 619.980.7048 or [email protected].

Sincerely,
__________________________________
George Litzinger, PE
Project Principal/CM Division Manager
Construction Management for Arnold Cypress Park Rehabilitation ii Table of Contents

SECTIONS

1. Firm Background and Qualifications.........................................................................................................................................1

2. Project Experience and References..........................................................................................................................................9

3. Project Approach ......................................................................................................................................................................14

TABLE(S)
Table 1. Subconsultant Identification and Qualifications..............................................................................................................3 Table 2. Dudek Park CM Experience................................................................................................................................................9

FIGURE(S)
Figure 1. Dudek’s California Offices.................................................................................................................................................1 Figure 2. Constructability Review Team...........................................................................................................................................2 Figure 3. Construction Management/Inspection Team ................................................................................................................3

APPENDIX(CES)
A Sample Document Review
Construction Management for Arnold Cypress Park Rehabilitation 1

1. Firm Background and Qualifications

1.1 Firm Overview
We are a California-based environmental and engineering consultant with nationwide offices and more than 700
planners, scientists, civil engineers, contractors, and support staff. We assist private and public clients on a range of projects that improve and evolve our
communities, infrastructure, and natural environment.

From planning, design, and permitting through
construction, we move projects forward through the
complexities of regulatory compliance, budgetary and
schedule constraints, and conflicting stakeholder interests.

Our professionals find practical, cost-effective approaches to help you achieve your specific project goals. We work to build your trust, which allows us to offer constructive solutions with your project's long-term success in mind.

Staff Availability and Continuity
As a mid-sized firm, we provide the personal service of project managers who stay with your project from start to finish, combined with the breadth and depth of capabilities characteristic of larger firms in order to meet your project's requirements. Our project managers are empowered to be
problem-solvers with the ability to make decisions in a timely fashion to keep project momentum moving forward. We are proud of our low employee turnover. Our staff's long tenure means the project manager you see at the bidding stage will likely be with you at project completion.

Diverse Capabilities
Our depth and breadth of experience means we can quickly assemble and mobilize the appropriate level of service to match your project needs and budget. Our 740+ person in-house team includes:
▪ AICP-certified environmental planners
▪ CDFW- and USFWS-certified biologists
▪ Registered professional archaeologists
▪ Registered landscape architects
▪ Registered environmental assessors
▪ Certified arborists and foresters
▪ Noise and air quality specialists
▪ Accredited LEED professionals
▪ Certified GIS professionals
▪ Certified hydrogeologists
▪ Licensed geologists
▪ Licensed professional engineers
▪ CMAA-certified construction managers
▪ Licensed contractors
▪ NASSCO and ICBO certified inspectors
▪ Licensed contractors
Figure 1. Dudek’s California Offices
Construction Management for Arnold Cypress Park Rehabilitation 2

1.2 Team Organization
We understand that the City is seeking a construction management firm to assist with constructability reviews during the design process and serve as your representative during construction, interfacing with the City throughout the design and construction phase. It is crucial that Dudek implement a work program that effectively communicates the project requirements and, more importantly, establishes a process that ensures incorporation of all details in the final work product. Figures 2/3 below identify the Dudek team for the design and construction phases, proposed roles of the key personnel, and outlines the lines of communication. George Litzinger, Construction Management Division Manager, will ultimately be responsible for all aspects of this project.

Dudek’s policy is to not change managers during a project and, in this case, it is extremely important from a consistency standpoint. It is also important that all project communication and correspondence is coordinated through one person. Mr. George Litzinger will be the point of contact for the City to avoid miscommunication. It will be his responsibility to organize and direct the required resources and to implement the work plan described in this proposal.

As requested in the RFP, resumes following the Caltrans Standard Form 330 format follow the Organizational Charts.

Figure 2. Constructability Review Team
Construction Management for Arnold Cypress Park Rehabilitation 3 Figure 3. Construction Management/Inspection Team
Subconsultants
Table 1. Subconsultant Identification and Qualifications Firm / Role Qualifications
Rockwell Construction
Services (RCS)
Electrical/Instrumentation
RCS provides electrical project review, inspection and general construction management assistance specializing in the water/wastewater industry. RCS’s goal is to identify and correct problems before they happen by working closely with the construction team from review of the contract documents pre-bid, through final Operation/Maintenance Manuals and As-Built Drawings at the conclusion of a project.

Atlas Technical Consultants
Special Inspection/
Materials Testing
Atlas provides professional testing, inspection, engineering, and consulting services from more than 100 locations nationwide. Atlas delivers solutions to both public and private sector clients in the transportation, commercial, water, government, education, and industrial markets. Atlas’ construction materials engineering and testing services features a full complement of professional engineers, geologists, lab managers and certified technicians, giving Owners confidence that their investment is built in accordance with the project’s approved plans and specifications.

Alliant Consulting, Inc
Labor Compliance
Alliant Consulting is a DBE, SBE and WBE certified firm. For over 15 years, Alliant has been dedicated to ensuring compliance on thousands of projects within California, Arizona and Utah. Alliant encourages a team approach for the implementation and enforcement of prevailing wage law, working in concert with the staff of the awarding agency and contractor/ subcontractor representatives to ensure the applicable legal requirements for both sides are met. Alliant’s knowledge of all types of funding and requirements of SB854, AB1701, AB199, AB566, SB418, SB96, Measure JJJ, Proposition 50, 55, 84, CMU, CDBG, HOME, HUD, LIHTC, TCAC, NSP and other program requirements is extensive on all levels of construction.

Construction Management for Arnold Cypress Park Rehabilitation 4 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE George Litzinger, PE Project Principal a. TOTAL 36 b. WITH CURRENT FIRM 36

15. FIRM NAME AND LOCATION (City and State) Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) B.S./1985/Civil Engineering
A.S./1981/Mechanical Engineering
Professional Engineer, California #47544
California Contractor – Engineering Class “A”
License #731744, Landscape License C-27

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Litzinger supervises the Construction Management Division is responsible for all of Dudek’s construction projects and programs covering both large and small projects up to $100 million. (Recent Awards: 2012 CMAA San Diego Chapter Project Achievement Award; 2011 CMAA So. CA Chapter Project Achievement Award; 2009 CMAA National Chapter Award; 2008 and 2009 ASCE Buildings and Structures Award of Excellence.)

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Shore Community Park (Indio, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2019
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Litzinger was project principal on this $3.5 million park that includes the following park elements: mass grading, soccer fields, basketball court, skate park, restroom building (by Romtec), water feature, walking paths, exercise equipment mounds, irrigation, planting, landscape, Musco lighting, and road improvements.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Connors Park (San Marcos, California)
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2017
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Litzinger was project principal on this 4.5-acre park project built on San Marcos Elementary School property under DSA jurisdiction. The project consisted of demolition of an existing school and park, mass grading, a reinforced concrete fenced and lighted multisport court (tennis/basketball/pickle ball), skate park, a fenced and lighted synthetic multi-use football field, Musco Sports Lighting parking lot, energy efficient lighting system. The project also included a separate design/build contract for a 2,000 SF masonry restroom/concessions and maintenance facility.

This project was funded by a Community Development Block Grant (CDBG). c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alga Norte Community Park (Carlsbad, California)
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2010
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Litzinger was Project Principal on the mass grading of this $40 million, 32-acre park project that consisted of a 50-meter competition pool, 25- yard activity pool, pool complex, administration building, baseball fields, skate park, dog park, basketball courts, restrooms and playground. The project required 220,000 CY of mass grading. Mr. Litzinger performed constructability review at the 100% design phase and was responsible for oversight of the Dudek CM Team’s resources, including staff, subconsultant coordination, client liaison, budgeting and reporting to the City Council.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miller Park and Amphitheater (Fontana, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2018
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Litzinger served as project principal for this $5 million, 3-acre park project that includes the following park elements: water feature and splash pad, restroom, bandstand, irrigation, landscaping, turf, sidewalks, walking paths, and a new SCE service. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Autumn Drive Street Improvements and Reconstruction of Buelow Park (San Marcos, California)
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2011
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Litzinger was the Principal in Charge for this $2 million improvement and reconstruction project consisting of replacement of the existing storm drainage system, private water and sewer systems, dry utilities, retaining and seat walls, restroom buildings, street parking, lighting, fencing and gates, playground and shade structures, curbs and gutters, street surface improvements, ribbon gutter, water play features, and basketball courts.

Construction Management for Arnold Cypress Park Rehabilitation 5 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Jaime Escutia Construction Manager a. TOTAL 12 b. WITH CURRENT FIRM 1

15. FIRM NAME AND LOCATION (City and State) Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) California State University Long Beach, California
B.S., Construction Engineering Management
Certified Construction Manager, CCM #10871
Cal OSHA – Ten-Hour Safety Certificate

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Jaime Escutia has over 12 years of experience on a variety of construction projects managing the construction budget, negotiations, project operations and ensuring quality adherence with construction standards. Projects have included public park improvements, sewer lift stations, pipelines, and public building renovations. Mr. Escutia’s duties included reviewing contractor’s schedules, progress payment requests, RFI’s and submittals, and contractor proposed change orders, and constructability reviews.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Contract Administrator (Huntington Beach, California)
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2014-2021
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Escutia was the Contract Administrator for the City of Huntington Beach Public Works Department for over seven years where he simultaneously administered multiple small to large scale projects and controlled yearly project budgets averaging 17 million. He directed a variety of construction projects managing the construction budget, negotiations, project operations and ensuring the quality adherence with construction standards.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Public Park Improvements (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2014-2021
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

As the Contract Administrator for the City, Mr. Escutia managed the rehabilitation and reconfiguration of several existing parks to include new uses.

The projects included new grass/landscaping installation, new sidewalks and tree removals. Several projects included demolition of existing buildings and the new construction of additional buildings. The past projects have added pickle ball and bocce ball facilities to existing parks. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Police Lobby Renovation (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2017
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Escutia managed this project that consisted of remodeling the Huntington Beach Police Lobby including installation of bullet proof glass, remodeling the area behind the front counter and make the public restrooms ADA compliant. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Arterial Paving Projects (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2016-2017
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Escutia was construction manager for these projects. The projects included rehabilitation of existing six lane asphalt roadways with raised medians, sidewalks, landscaping; and traffic signal modifications. Several rehabilitation methods were used including Full Depth Reclamation, which consisted of stabilizing the roadway with a 13-inch cement treated subgrade. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Traffic Signal Modifications Projects (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2017-2019
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Escutia was construction manager for several traffic signal modifications projects. The projects consisted of modifying existing traffic signals, installing interconnect fiber and adding ADA compliant ramps. Various forms of state and federal funding reimbursements were part of the projects.

Construction Management for Arnold Cypress Park Rehabilitation 6 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ryan Ruiz, PE Construction Manager a. TOTAL 13 b. WITH CURRENT FIRM 10

15. FIRM NAME AND LOCATION (City and State) Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) University of California, San Diego, in La Jolla, California B.S., Structural Engineering
Professional Civil Engineer No. C86394
CESSWI
Qualified SWPPP Practitioner (QSP)
ITCP; PACP; MACP

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ryan Ruiz has experience as a Construction Manager, Office Engineer and Field Engineer. Projects included parks, public buildings, wastewater treatment facilities, pump stations, large and small diameter sewer and water pipelines, and roadwork. Mr. Ruiz’s duties included reviewing contractor’s schedules, progress payment requests, RFI’s and submittals, and contractor proposed change orders. Mr. Ruiz also participated in design revisions, safety, and negotiations on change orders.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miller Park and Amphitheater Project (Fontana, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2018
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ruiz was Construction Manager for this project that included the construction of a restroom building, bandstand and stage, stairs, ramps, concrete paving, concrete walls, hand rails, electrical fixtures, conduit and wiring, landscape planting and irrigation, landscape drainage systems, drinking fountain, water feature splash pad, surge tank and water lines and appurtenances, sewer lines, and storm drain lines and appurtenances. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central City Park Project (Fontana, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2021
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ruiz is currently working as the construction manager for this new park project. The project includes the installation of (1) lighted soccer field and (2) lighted soccer/football fields with artificial turf, a tot lot, picnic areas, restroom and snack bar facility, (2) new parking lots, storage building, horse shoe facility and pits, community garden area, mechanical and electrical improvements, and a new six-foot high anti-graffiti wall along the northern border of the park property.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Police Station Expansion Project (Fontana, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2015
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ruiz worked as a Field and Office Engineer for the Police Expansion project which included the fabrication of an entirely new east stair tower, HVAC system, simulator room and firing range for the department, locker rooms, conference rooms, offices, weight room and bathrooms by demolishing and reconstruction of the entire basement and east stair tower. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City Park Basketball/Volleyball Court Addition (Corona, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2019
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ruiz was inspector and office engineer for this project that involved removing an existing parking lot and constructing two half basketball courts, a full size basketball court and a volleyball court located in the northern center of City of Corona’s City Park. The proposed improvements included grading, hardscape improvements, a bio retention facility, irrigation system, planting, and electrical work. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Newhall Ranch Advance Riparian Mitigation Project (Newhall, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2020
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ruiz has served as the Project Engineer and QSP for the Newhall Ranch advance wetlands and mitigation project. Mr. Ruiz’s duties include regular and ongoing maintenance of all flood, drainage, wet wells, and water quality protection structures. Perform daily engineering reports of grading cut/fill operations of 154,000 CY of earthwork, monitoring proper BMP and SWPPP implementation and documentation, coordination with contractor, project biologist and owner regarding design deficiencies and plan changes, and ensuring final planting, irrigation, and grade, were installed per plan and specification at both Mayo and Potrero sites, totaling 84.2 acres.

Construction Management for Arnold Cypress Park Rehabilitation 7 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Tom Ramirez Inspector a. TOTAL 35 b. WITH CURRENT FIRM 10

15. FIRM NAME AND LOCATION (City and State) Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Ramirez has over 35 years of experience in construction providing construction management and field inspection services on both public works and private development projects. Experience includes water, sewer, storm drain, and pipeline construction; wasetwater treatment plants; roadway construction; bridge retrofits; and new construction, repairs and remodels of public buildings and residential developments. Experience includes preconstruction, constructability and plan reviews; survey staking; SWPPP; and traffic control.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Shore Community Park (Indio, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2019
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ramirez served as inspector on this $3.5 million park that includes the following park elements: mass grading, soccer fields, basketball court, skate park, restroom building (by Romtec), water feature, walking paths, exercise equipment mounds, irrigation, planting, landscape, Musco lighting, and road improvements.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rancho Jurupa Park Expansion Phase 2 (Riverside, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2011
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ramirez provided inspection services for the renovation and expansion of this 45-acre park project for the Regional Park and Open-Space District. The project required the demolition of existing buildings and the installation and inspection of new underground utilities such as water, sewer, joint trench, irrigation, and landscape. A clubhouse and campsite were constructed, in addition to an 18-hole miniature golf course, concrete water play area, metal lunch structures, new entry roads, and walkways. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Police Department Renovation Project (Hemet, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ramirez is currently providing inspection services on this project that includes a complete overhaul of the building, which is the oldest in the county operating since 1951. Project includes upgrades to the Hemet Police Department’s temporary holding facility and a makeover for the flooring, walls and bathrooms.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Railroad Canyon Water Reclamation Facility Yard Piping (Lake Elsinore, California)
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Ramirez is currently the inspector for this water reclamation facility project for the Elsinore Valley Municipal Water District that consists of lining existing recycled water ponds, installing yard piping connected to the ponds, constructing baffles in the existing aeration basins, modifying aeration basin piping, adding mixers, and providing miscellaneous associated work including electrical and I/C.

Construction Management for Arnold Cypress Park Rehabilitation 8 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE John Griffin Inspector a. TOTAL 35 b. WITH CURRENT FIRM 3

15. FIRM NAME AND LOCATION (City and State) Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) California State University, Fullerton
Supervisor Development Certificate
APWA Certified Public Infrastructure Inspector (CPII)
Qualified Storm Water Practitioner (QSP)
IMSA Work Zone Safety

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) John Griffin has over 35 years of experience providing project management, construction management, and inspection services in the public works sector. He worked with the City of Huntington Beach for most of that time, spending 22 years in the Engineering Division, and 13 years with the Maintenance Division. His job duties with the city included contract administration, project management, inspection, and quality assurance of project plans and specifications for a wide variety of public works infrastructure projects. Projects have included sewer, water, lift stations, well sites, bridges, storm drains, grading, slope repairs, structures, utilities, and transportation. Mr. Griffin joined Dudek in 2019 after retiring from the City of Huntington Beach and currently provides construction inspection services on a variety of public works projects for various agencies throughout Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Annual Slurry Seal Projects (Laguna Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2020-2021
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Griffin provided on-site inspection services for two of the City’s annual slurry seal contracts (2020 and 2021). Each year the City slurries approximately 200,000 SF of streets within the City as part of its annual program. Mr. Griffin worked with the contractor and residents daily to coordinate road closures and access to residents. The City received no complaints during either contract. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Marine Safety Building Seismic Retrofit (San Clemente, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2021
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Griffin provided on-site Owner’s representative services on a very challenging seismic retrofit project for the City of San Clemente’s historic Marine Safety Building situated on the beach near the pier. Work consisted of slope protection, roof framing repairs, interior room renovations, parking lot improvements, and building siding repairs.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Public Works Contract Administrator (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2013-2019
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Griffin served for six years as Contract Administrator for a variety of public works capital improvement projects and maintenance service contracts. Duties included writing City, State and Federal funded contracts; monitoring of construction projects for adherence to Federal and State labor laws; reading and interpreting blueprints, plans and specifications, and manuals; writing detailed reports; and maintaining accurate records.

Tasks also included maintaining a well-articulated system for monitoring the progress of projects and programs as well as troubleshooting, analyzing, and resolving problems associated with construction contracts. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Senior Public Works Construction Inspector (Huntington Beach, California) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) 2001-2013
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Mr. Griffin served as senior inspector for the City for over 12 years performing advanced journey-level inspection and contract administration of various types of municipal infrastructures, including the construction and rehabilitation of streets, water facilities, sewers, lift and pump stations, traffic signals, street lighting, beach facilities, parks, landscaping, irrigation systems, median construction, alleys, buildings, and bridges. He was responsible for the training and oversight of lower-level inspection staff and assured all Federal, State, and local policies, laws, and regulations were met as well as all OSHA standards and safety practices followed.

Construction Management for Arnold Cypress Park Rehabilitation 9

2. Project Experience and References
Dudek’s team recently provided construction management and inspection services to the City of Fontana on a park project, and recently completed two park projects for the City of San Marcos that are very similar to the City’s project. Since 1980, Dudek has successfully managed the construction of numerous park projects that included obtaining financing, environmental, value engineering, constructability reviews, construction management and inspection, and owner’s representative services. Table 2 summarizes Dudek’s relevant project experience followed by detailed project descriptions for select projects. References are provided with each description.

Table 2. Dudek Park CM Experience
Project Experience
Tasks
Constructability/ Bid Phase ManagementConstruction ManagementContract AdministrationInspection ServicesWater FeaturesPlaygroundsSkate FeaturesSports LightingBuildingsAthletic Turf FieldsSports NettingArchitectural Concrete Bub Williamson Park
City of Vista ◆ ◆ ◆ ◆ ◆
Central City Park
City of Fontana ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Southcrest Park
City of San Diego ◆ ◆ ◆ ◆ ◆ ◆ ◆
North Shore Community Park
Desert Recreation District (Indio, CA) ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ Miller Amphitheater - City of Fontana ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Connors Park/Elementary School Park
City of San Marcos ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Alga Norte Community Park
City of Carlsbad ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Rancho Jurupa Park
Riverside County Parks & Open Space Dist. ◆ ◆ ◆ ◆ ◆ ◆
Buelow Park & Autumn Dr. Improvements
City of San Marcos ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Sunset Park - City of San Marcos ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
The Crossings Golf Course, Club House and
Maintenance Facility
City of Carlsbad
◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Hollandia Park - City of San Marcos ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Poway Community Swim/Skate Park
City of Poway ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Yucaipa Regional Park
County of San Bernardino ◆ ◆
Coast Rail Trail - City of Carlsbad ◆ ◆ ◆ ◆
Guajome Park Campground
County of San Diego, Parks & Rec Dept. ◆ ◆ ◆ ◆
Construction Management for Arnold Cypress Park Rehabilitation 10 Bub Williamson Park Renovation Construction Management & Inspection Services Client: City of Vista, 200 Civic Center Drive, Vista, California 92084 Client Reference: Amanda Lee, Assistant City Manager, 760.643.5208 Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager Construction Value: $3.5 million
Dudek is currently providing construction management and part-time inspection services on this project. The project is the complete renovation of an existing 4-acre park in the City of Vista from a sports-style park to a passive park with playgrounds, walking trails, and nature area funded through a CDBG grant. The project includes site grading, new PCC sidewalk, parking lot reconstruction, installation of playgrounds/play equipment/protective surfacing, water fountains, bike racks, gazebos, fitness station, remodeling of existing restroom building, landscape and irrigation installation, installation of low-voltage power and lighting poles, bioretention basins, and retaining walls.

North Shore Community Park Construction Management & Inspection Client: Desert Recreation District, 45-305 Oasis Street, Indio, California 92201 Client Reference: Troy Strange, 760.347.3484, [email protected] Key Staff: George Litzinger, Project Manager / Ryan Ruiz, Tom Ramirez, Inspectors / Subconsultants: Atlas Technical Consultants, Alliant Consulting, Rockwell Construction Services, Safeplay By Design Construction Value: $5 million
Dudek provided a full turnkey construction management team including constructability reviews of park and building projects, construction management, inspection services, special inspection, and special inspection services on this project. The new park project involves the construction of a 5- acre park, including a shaded pavilion, soccer field, skate plaza, sport court, playground, and walking path. A new active use park was constructed and will include a new bike shop building and restroom with lighting.

Miller Park Amphitheater Project
Client: City of Fontana, 8353 Sierra Ave, Fontana, California 92335 Client Reference: Luis Villalobos, 909.350.6776, [email protected] Key Staff: George Litzinger, Project Principal / Ryan Ruiz, Construction Manager / Subconsultants: Rockwell Construction Services
Construction Value: $6 million
Dudek provided construction management and inspection services on the City’s Miller Park Amphitheater Project. The project includes demolition of the existing amphitheater berms, paving, new streetlights, hardscape, sidewalks, landscaping, new restroom building, band shell and stage, new splash pad with pumping system and wet well, and improvements to the existing Pacific Electric Trail. The project is nearing completion and will be the centerpiece for the City’s Civic Center, surrounded by the City’s library, fire station, police department and Miller Gym.

Construction Management for Arnold Cypress Park Rehabilitation 11 Central City Park Project
Client: City of Fontana, 8353 Sierra Ave, Fontana, California 92335 Client Reference: Luis Villalobos, 909.350.6776, [email protected] Key Staff: George Litzinger, Project Manager / Ryan Ruiz, Construction Manager / Inspector, Tom Ramirez Construction Value: $11 million
Dudek is currently providing construction management and inspection services on an 8-acre site that contains the following facilities: a kit restroom/ concession building, a large kit storage building, two small kit storage buildings, three trash enclosures, two monument walls, six fabric shade structures, universally accessible playground, concrete paving, cmu walls, welded fire fencing, decorative sports-themed bollards, flagpole, electrical fixtures, conduit and wiring, landscape planting and irrigation, landscape drainage systems, drinking fountains, misters, waterlines and appurtenances, sewer lines and appurtenances, storm drain lines, and three turf fields.

Connors Park/San Marcos Elementary School Park
Client: City of San Marcos, 1 Civic Center Drive, San Marcos, California 92069 Client Reference: Jim Chafe, Deputy Public Works Dir., 760.744.1050, [email protected] Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager Construction Value: $5 million
Dudek provided construction management, inspection, special inspection, and DSA inspection services on this project. Nearly half of the 4.65-acre park site was built on the old San Marcos Elementary School site under DSA jurisdiction. The project consisted of demolition of an existing school and park, mass grading, a reinforced concrete fenced and lighted multisport court (tennis, basketball, pickle ball), skate park, a fenced and lighted synthetic multiuse football field, Musco Sports Lighting 2 playgrounds, and an energy efficient lighting system. The project also included a separate design/build contract for a 2,000 SF masonry restroom/concessions and maintenance facility. This project was funded by a Community Development Block Grant (CDBG). Dudek was responsible for administering the CDBG funding during the project and enforcing work force and prevailing wage requirements in accordance with CDBG requirements. The project was completed on time and within budget.

Alga Norte Community Park
Client: City of Carlsbad, 5950 El Camino Real, Carlsbad, California 92008 Client Reference: John Maashoff, Public Works Manager, 760.434.2856, [email protected] Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager / Subconsultants: Rockwell Construction Services Construction Value: $30 million
Dudek performed a constructability review and provided construction management and inspection on the City’s $40 million, 32-acre park project that includes a 50-meter competition pool, 25-meter activity pool, pool complex, administration building, baseball fields, skate park, dog park, basketball courts, restrooms and playground for the City of Carlsbad. The Construction Management for Arnold Cypress Park Rehabilitation 12 project required 350,000 CY of mass grading, storm drains, irrigation and landscaping. The center includes a 13,000 square feet of building space for a mechanical building, an administration building, locker-room facilities, group meeting facilities, a fitness room, and a concessions kitchen.

Hollandia Park
Client: City of San Marcos, 1 Civic Center Drive, San Marcos, California Client Reference: Jim Chafe, Deputy Public Works Dir., 760.744.1050 Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager Construction Value: $5 million
Hollandia Park is located in east San Marcos on Mission Hills Drive. The scope encompassed design and construction management services for this 30-acre recreational park adjacent to and north of Mission Hills High School. The park amenities include two (2) lighted baseball/softball fields, two (2) lighted soccer fields, tennis courts, an amphitheater, playground, dog park, skate park, parking lots, a care-taker residence, public restrooms, horseshoe pits, equestrian trails, and other site amenities. A unique feature of this project is that it is built on a brown field and is irrigated solely on well water. Construction management responsibilities included facilitating weekly on-site progress meetings, responding to all RFI’s, providing all design clarification & solutions, approving change orders & pay estimates, providing all landscape & hardscape inspection, providing photo documentation, and providing final asbuilts and project close-out.

Bradley Park Field Re-Grading Project
Client: City of San Marcos, 1 Civic Center Drive, San Marcos, California 92069 Client Reference: Jim Chafe, Deputy Public Works Dir., 760.744.1050, [email protected] Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager Construction Value: $1 million
The project consisted of re-grading, replacement of irrigation and turf for the outfield of the Northern Baseball Field and for the multi-use (Soccer/Football) Sports Field at Bradley Park. Both fields required 100,000 SF of turf removal, import of top soil, compaction, laser grading and installation of new fencing.

Bradley Park is located at the Old San Marcos Landfill which is regulated by the County of San Diego Department of Environmental Health Solid Waste Local Enforcement Agency (LEA). Dudek provided construction management, inspection services and ensured the contractor complied with LEA requirements. The project was successfully completed while maintaining public access to the rest of the park.

Construction Management for Arnold Cypress Park Rehabilitation 13 Rancho Jurupa Park Expansion
Client: Riverside County Regional Park and Open Space District, Riverside, California Client Reference: Claire Clark, 951.955.6515
Key Staff: George Litzinger, Project Principal / Tom Ramirez, Inspector Construction Value: $5 million
Dudek provided inspection services for the renovation and expansion of this 45-acre park project. The project required the demolition of existing buildings and the installation and inspection of new underground utilities such as water, sewer, joint trench, irrigation, and landscape. A clubhouse and campsite has been constructed, in addition to an 18-hole miniature golf course, splash pad water play area, metal lunch structures, new entry roads, and walkways.

Sunset Park
Client: City of San Marcos, 1 Civic Center Drive, San Marcos, California 92069 Client Reference: Jim Chafe, Deputy Public Works Dir., 760.744.1050, [email protected] Key Staff: George Litzinger, Project Principal
Construction Value: $5 million
Dudek assisted with design and inspection services to the City of San Marcos for Sunset Park while working at a separate firm. The park amenities include a lighted soccer field, lighted indoor soccer arena with synthetic turf, large playground area w/shade structure, well/pump station, splash pad, basketball courts, sand volleyball court, 6-hole disc golf course, amphitheater, multi-use trails, caretaker's unit, and restroom and mechanical buildings. The lithocrete concrete splash pad (WaterPlay System) is a multiple actuator system feed by a domestic feed with a bioswale draingage treatment system. ►Winner of the APWA (San Diego/Imperial Chapter) Project of the Year award for 2010.

Buelow Park and Autumn Drive Improvements
Client: City of San Marcos, 1 Civic Center Drive, San Marcos, California 92069 Client Reference: Jim Chafe, Deputy Public Works Dir., 760.744.1050, [email protected] Key Staff: George Litzinger, Project Principal / Jason Linsdau, Construction Manager Construction Value: $3 million
Dudek provided construction management and inspection services to the City of San Marcos for Autumn Drive and Buelow Park. Services include improvements and reconstruction of the existing storm drainage system, private water and sewer systems, dry utilities, closed circuit television, lithocrete and natural stone seat walls, a 1,000 SF restroom building, street parking, lighting, fencing and gates, playground and shade structures, curbs and gutters, street surface and landscaping improvements, water play features, and basketball courts. This was a Community Development Block Grant federally funded project.
► Winner of the APWA (local San Diego chapter) Project of the Year award for 2011 Construction Management for Arnold Cypress Park Rehabilitation 14

3. Project Approach

3.1 Project Understanding
This project involves the rehabilitation of Arnold Cypress Park, including four (4) softball fields, batting cages, pickleball courts, lights, playground, picnic pavilion, restroom, walking paths, and basketball/volleyball courts.

The proposed Dudek team is uniquely qualified to manage this project due to our extensive background in constructing similar active-use parks and building projects.

Our role in the project will be to assist the City by providing the constructability review so that plans are clear, concise, and constructible, ensuring cost overruns are minimized and the project can be built on time. Our construtability reviews of park and building projects have saved the owners a significant amount of time and money. We identify busts, ambiguities, and missing information that contractors will use to claim delays and extra costs. A typical example that results in change orders is not performing sufficient geotechnical investigations during design and utility conflicts. Once our review is complete, we will generate a list of issues to be discussed with the City. We will coordinate with the utilities to complete any new or outstanding work orders.

We understand the challenges with this project, will discuss them with the City, and will be good neighbors with the residents throughout the project. Dudek recently managed an $11 million park project for the City of Fontana that is very similar. We are coordinating with the residents, and strictly monitoring dust, noise, and start times to minimize impacts during the project, which has resulted in no public complaints to date.

We understand the complex nature of constructing a park that involves grading, turf, buildings, concrete structures, art features, play equipment, architectural concrete, and a large amount of ornamental landscaping.

Parks are not only a work of art and centerpiece for the City, they must be built to the highest standards to withstand heavy use for many years. They must be cost effective and user-friendly for City crews to maintain.

Ensuring that the park is built to these standards is Dudek’s #1 goal.

Dudek recently completed a project for the City of San Marcos very similar to the one the City is constructing.

Connors Park, featured here, was sandwiched between residential buildings and an elementary school, and located on a busy thoroughfare.

Construction Management for Arnold Cypress Park Rehabilitation 15

3.2 Phase 1 – Constructability Review
Administrative Documentation
Kick-off meeting with the City
Upon our selection, we will meet with the City, discuss the project, identify the issues, and define action items along with dates for the completion of the items. A tentative agenda for the meeting is as follows:

1. Introduction, roles, and responsibilities.

2. Obtain copies of all project documents, reports, permits, plans, specifications/standard plans.

3. Discuss meet & greet with designer to review project approach for the constructability reviews.

4. Discuss City requirements for CM management software.

5. Review permit requirements and responsibilities.

6. Review encroachment and building permit and inspection requirements.

7. Review funding requirements, if any.

8. Confirm environmental requirements and monitoring.

9. Prepare final action items list, responsibilities, and dates for completion.

Constructability Review Approach
The goal of the constructability review is to produce a clear, concise, and accurate set of contract documents. Our approach will uncover any and all issues, and ambiguities in the plans and specifications that may lead to delays and change orders. This begins with a thorough review of the documents by experts in each discipline of work following our proven process as follows:

1. Meet with the City and designer and receive briefing on the project along with any areas of concern.

Receive copies of all project documents at the 60%, 90% and 100% stages.

2. Dudek separates the documents into the specific disciplines – civil, structural, mechanical, architectural, electrical & instrumentation, and soils, and provide them to the experts in each specific field. They are given a specified time to review and provide comments to Mr. Litzinger.

3. Mr. Litzinger will then consolidate the comments in a report format (example included in Appendix A) and distribute to the City.

4. Dudek will conduct a meeting with the design team and City to review the comments and discuss resolutions to the issues uncovered. During the review, Dudek will also look for value engineering items that will reduce the construction cost without compromising the design.

Review Items Considered During Constructability Reviews

1. We will review the schedule timeframes for accuracy and reality.

2. Review encroachment and inspection requirements and determine any constraints.

3. Review funding, if any, requirements and make sure all requirements are included in the contract documents.

Construction Management for Arnold Cypress Park Rehabilitation 16

4. Review mitigation monitoring and reporting program and include requirements, if any.

5. Review required submittals including deferred submittals.

6. Review field office requirements, including offices for construction manager.

7. Structure of bid schedules, including the use of allowances.

8. Review existing utilities in Crescent Avenue and Watson Street. Recommend potholing and meeting utility companies in the field to discuss existing utilities and the procedure for relocation, if necessary.

9. Review permits conditions, easements, and agreements.

10. Review status of electrical applications and work orders status, timing and conditions.

11. Verify noise and air pollution control ordinances.

12. Verify soils information in the soils report.

13. Address disposal of excavated soils material, if any.

14. Define times and routes for truck traffic and deliveries.

15. Review details are consistent, accurate, and properly referenced. Compare plans to specifications for contradictions or missing information.

3.3 Phase 2 – Construction Management Phase
1) Review Project with Contractor – Prior to the preconstruction meeting and issuance of the NTP, we will schedule an informal meeting with the contractor and City to discuss what they believe are the project issues and what we can do to assist them to make this a successful project. This meeting will set the tone of collaboration and ‘partnering’ and hopefully the contractor is forthcoming with information that will minimize delays and change orders. We will confirm lines of communication and establish a procedure for dispute resolution and procedures for change orders that will make the process smooth and efficient. 2) Preparation of Logs and Administration Documents – Per our CM Procedures Manual, Dudek will provide all of the required documents prior to construction and will provide a table of the required documents along with submission dates for City’s review.
3) Overview of Administrative Issues to be Addressed with Contractor/City – Our goal is to have all administrative issues addressed prior to issuing the NTP. Our approach is as follows:
▪ Meeting with Utility Companies – we will meet with all utility companies prior to the start of construction to review their work and confirm schedules.
▪ Coordination with City’s Building Department – We will meet with the City’s building official to review and confirm inspection protocols, process for approving deferred submittals, special inspection requirements, and general coordination.
▪ Confirm Contractor’s On-Site Pothole Excavation Program – We will confirm with the contractor which existing facilities to pothole well in advance so changes can be made without impacting the schedule. ▪ Coordination Concerns– confirm procedures/routes/staging areas for accessing the park and removing any service from the area.
▪ SWPPP – We will ensure the contractor completes a SWPPP prior to starting construction. ▪ Survey – We will confirm design elevations are accurate prior to starting work. Sign-off is required by the contractor that accepts the design elevations.

Construction Management for Arnold Cypress Park Rehabilitation 17 ▪ Site Controls – We will confirm contractor’s plans to comply with the site controls specified in the contract. ▪ Traffic Control Plans – We will confirm plans are approved prior to starting work. ▪ Construction Permits – We will confirm that contractor has obtained all permits, such as haul route, encroachment permits, etc.
▪ Submittals – We will prepare a submittal register to compare to the contractor’s list. The goal is to avoid delays to construction due to a missed or unapproved submittal. ▪ RFI’s – We will define the procedures and response times for RFI’s. The goal is to avoid delays. ▪ Key Personnel Directory -- We will prepare and maintain a key personnel directory with contact information in the construction management plan.

Summary of Pre-Construction Services Tasks
▪ Prepare CM Procedures Manual
▪ Constructability Analysis with Contractor/City
▪ Submittal Log -- Dudek will prepare as part of the construction management manual ▪ Early Utility Coordination -- Dudek will meet with all utility companies prior to construction ▪ Pre-Condition Survey -- VIDEO FACT will be documenting existing conditions ▪ Pre-Construction Meeting -- Dudek will conduct the pre-construction meeting in accordance with the CM Manual
▪ Construction Schedule Review -- Dudek will conduct schedule review workshops prior to construction until an acceptable baseline schedule is accepted and approved.

Management Approach During Construction
Our approach is proactive and will obtain a quality construction project by working together with the construction contractor and the construction team. Our mutual goal must be a quality product conforming to the contract requirements. A cooperative and professional working relationship must be established to realize this common goal. The key to success for this project is to develop a clear understanding of the project and issues that will be encountered during construction. Our role will be to understand and interpret the plans, specifications, and permits and ensure compliance. We will be able to anticipate and have knowledge of the challenges the contractor will face and will proactively discuss and resolve them with the contractor.

Dudek completed this park project for the City of San Marcos, Buelow Park, which included basketball courts, skate park, splash pad, picnic areas, restroom facilities, decorative hardscape, and landscaping.

Construction Management for Arnold Cypress Park Rehabilitation 18 Communications in Writing
Paperwork is critically important in construction management. All communication will be provided to effected personnel in writing. We will maintain daily logs, complete incident reports, photograph elements of the project, provide monthly progress pay estimates, contract change orders, labor and equipment records, personnel records, and other general correspondence.

Construction Manager Approach
The CM will be responsible for overall QA and coordination of the project and will work closely with the City, contractor, and inspectors to resolve day-to-day construction issues. The CM will also ensure project issues are identified and resolved quickly. Project issues will be organized on a critical action item report, which will detail administrative, design, construction, environmental, and coordination issues that arise. Each action item will be assigned to project personnel with a target date to complete or resolve. The report will be updated at the weekly construction management staff and contractor progress meetings.

Inspector Approach
Inspectors will be on site daily during working hours and whenever work is performed. They will be available by cell phone whenever not at the site to answer any questions and resolve issues and will be the key point of contact for the contractor’s project manager and superintendent during the course of the work. They will not direct the contractor’s work but will facilitate the contractor’s efforts by anticipating issues that might affect the progress of the work. Dudek will photo document the project. Upon beginning each day's fieldwork, our personnel will download the day's images from each digital camera to the computer network located in the field office. They will examine the site daily, manage subconsultants, and attend weekly progress meetings with the contractor. This is where old and new business issues are discussed, such as action items developed, progress to date is reviewed in detail, a contractor’s three week look-ahead schedule is developed, and items from the City or other consultants are discussed.

Construction Management for Arnold Cypress Park Rehabilitation 19 Detailed Scope of Work
Task 1 Project Management
We will coordinate all work efforts for this project, including regular project progress meetings and regular updates on the project status and budget.

Progress Meetings
We will conduct monthly progress meetings with the project team. We will prepare an agenda that will include the following topics: safety, RFI, submittals, change order, schedule, and construction progress.

Task 2 Construction Documents Reviews
Dudek will perform a review of the construction documents for clarity, conflicts, consistency, and completeness with respect to bidding and construction purposes.

Construction Sequence and Staging
Dudek will review the project for sequencing and staging particularly with regards to pedestrian safety.

Task 3 Construction Administration
Contract Administration

1. Administration: Administer construction contracts and provide technical construction management support to the City.

2. Contractor Communication: Provide effective written and oral communication to the contractor and other stakeholders in the administration of the contract. Provide for timely, thorough, clear, effective, and responsible communications to Requests for Information (RFI's), Requests for Change (RFC's), Requests for Proposal (RFP's), submittals, and other miscellaneous correspondence. Receive, log, and track requests for information (RFIs, RFCs, and RFPs).

3. Quality Assurance: The Dudek team will provide Quality Assurance of the contractor’s work.

4. Interaction with Agencies: Dudek will coordinate and maintain on-going interaction with appropriate agencies, utilities, and City staff to ensure successful project completion.

5. Substitution Requests: We will evaluate requests for material and equipment substitutions and changes based on compliance with contract specifications and will take into account the impacts to cost and schedule. We will consult with the project team as required.

6. Submittal Review/Logging: We will receive, respond, log, and track submittals. We will forward submittals to the Design Engineer. Submittals responded by the designer will be tracked for a timely response.

7. Project Meetings: We will conduct weekly job site construction meetings involving the project team and maintain action items, minutes of meetings and compliance with the contract provisions. We will maintain and distribute meeting minutes within two (2) working days.

Controls and Scheduling
Dudek will provide comprehensive project scheduling and control expertise as follows:

Construction Management for Arnold Cypress Park Rehabilitation 20

1. Baseline Schedule Review: Review and comment on contractor's baseline and project schedule critical path, and logic review, and ensure that schedule meets all requirements of contract documents.

2. Progress Schedule Review: Review and monitor contractor’s schedule monthly to monitor project progress and detect early delays.

3. Cost and Budget: Monitor project construction costs, budgets, and schedule and maintain current workflow projections.

4. Reporting: Prepare and distribute monthly construction reports, including at a minimum:
▪ Daily Inspection Reports
▪ Weekly Job Site Meetings Minutes
▪ Monthly Report Overview
▪ Project cost to date
▪ Schedule updates
▪ Recommendations to mitigate project delays

5. Progress Payment Review: Review and approve monthly contractor invoices, verify compliance to all terms and conditions of contract and make payment recommendations.

6. Contract Extensions: Review, analyze, and make recommendations on contractor time extensions/requests.

7. Miscellaneous Coordination: Coordinate and monitor work to be performed by others.

8. Project Notice Coordination: Receive and review project notices and provide appropriate recommendations.

9. Performance Evaluation: Provide quarterly Contractor performance evaluations during construction.

10. Time Impact Analysis (TIA) Review: CM will monitor and log Contractor labor time, attendance, labor cost, minimize compliance risk and evaluate in coordination with potential change order claims.

11. Monitor Time and Materials Work: Monitor contractor work performed on a time and materials (T&M) basis to ensure that the contractor labor charges are fair and appropriate, and that materials purchased are of quantity and quality necessary to the project and documented on invoices.

Cost Estimating
Dudek will maintain a cost estimating system that conforms to industry accepted practices and provide the following:

1. Contractor Proposals: Evaluate contractor cost reduction proposals in accordance with industry cost standards.

2. Change Order Review: Review proposed change orders.

Document Control
Dudek will establish a document management system for the following:

1. Filing: Utilize a filing system that complies with City standards.

2. Claims: Identify, analyze, and prepare construction claims and disputes by assessing or validating entitlement and quantification of damages and promoting a successful resolution.

Construction Management for Arnold Cypress Park Rehabilitation 21

3. Document Tracking: All central receipts, control, storage, distribution, indexing and tracking of all documents.

4. Document Managing: All documents, incoming and outgoing, associated with the construction management activity of all assigned projects, including, but not limited to submittals, requests for information (RFIs), requests for clarifications (RFCs), pay requests, change orders (C.O.s) and correspondence.

5. As-Built Documents Administration: Maintain a current set of as-built drawings and specifications.

6. Document Maintenance: Maintaining all field documents, storing original documentation and furnishing to the City at project completion.

Spare Parts Inventory
Dudek will review this specification but this may not be applicable.

Operations and Maintenance Manuals
Dudek will receive final O&M equipment manuals from contractor and coordinate their review. Final O&M manuals will be delivered to the City.

Change Order and Claims Management
Dudek will implement a comprehensive claims management program. When agreement cannot be reached, we will formulate a claims defense and participate in resolution including:

1. Document Managing: Coordinate, assemble and review supporting documentation for change order processing and make final recommendations to City staff.

2. Contractor Request Review: Review requests of alleged cost increases and/or time impacts for merit concurrently.

3. Change Order Review: Thoroughly analyze the proposal and develop a negotiating position. When necessitated by variations between contractor price for change and the CM’s fair cost estimate we will negotiate an equitable resolution with guidance from the City.

4. Change Order Expediting: After the equitable resolution is reached, we will expedite approval of the negotiated change order.

Task 4 On-Site Representation
Dudek will monitor construction activities, as follows:

Daily and Weekly Documentation

1. Documentation of Construction Activities: Provide documentation of construction activities, duration of activities, labor resources, and equipment allocation.

2. Construction Reporting: Provide daily construction activity reports, labor resources, on-site equipment, and work conditions.

3. Non-Conformance Reporting: Provide non-conformance reports.

4. Photographic Records: Provide weekly photographic/digital records of the project during construction.

Construction Management for Arnold Cypress Park Rehabilitation 22 Storm Water Pollution Prevention Plan Inspection

1. Review contractor’s site-specific BMPs.

2. Monitor contractor’s activities regarding pollution prevention controls and activities.

Task 5 Materials Testing/Geotechnical Services
Dudek’s subconsultant, Atlas, will provide all material testing of soil, concrete, metal, steel, and other materials as required per the plan and specifications. Atlas’ proposal is available upon request.

Task 6 Construction Close Out
Dudek will manage the turnover of the assigned project to the City.

Site Closeout
Site Closeout tasks will include:

1. Site Final Walk-Through: Coordinate and conduct a site final walkthrough to verify completion of contract and all related items of work within 7 days of substantial completion.

2. Site Punch List: develop site punch list, verify completion, and obtain final documentation and releases within 7 days of substantial completion.

3. Site Record Drawing Preparation: Verify and deliver contractor as-built marked up drawings for each site to the City for record drawing preparation within 14 calendar days of site substantial completion.

4. Site Permitting: Monitor permit and agency sign offs within 14 calendar days of substantial completion.

5. Site Final Reporting: Prepare site summary report in accordance with the City within 7 days of final completion.

6. Site Documentation Turnover: Turnover site project files, contract, correspondence, and documentation within 14 calendar days of final completion.

7. Site Warranty Coordination: Prepare a list of warranty items, warranty period, and warranty repair procedures, and turn over to the City.

8. Site Demobilization: Demobilize the CM staff and facilities in accordance with agreed upon plan.

Specific Issues to be Anticipated
Although there will be many issues to address during construction, the key will be to address them quickly and keep the project moving. Our two-phase approach is geared to proactively addressing issues up-front and not being reactionary when the contractor brings them up. A brief overview of some of the issues we are anticipating are as follows.

Potential Grading Issues:
1) Grading – for some reason – always seems to have issues and controversy, and we have seen almost every claim made by grading contractors using the catch-all claim of ‘Changed Conditions”. During our informal meeting with the contractor we will raise the following issues:
2) Topography -- Confirm that the topographic information of the site is accurate. It only takes one error to start a domino effect on the entire design that may be difficult to correct during construction. The Construction Management for Arnold Cypress Park Rehabilitation 23 elevations and topo MUST be accurate, and the contractor must agree in writing that they accept the topography and will not come back after the fact for claim because of inaccurate topo. 3) Grading Scope of Work Between Civil and Architect – We need to confirm that the grading plans agree with the Architect’s grading expectations.
4) Haul Routes – Need to define the truck delivery and haul routes 5) Staging and Storage Yards – Need to define locations and areas for the contractor’s use for staging and lay-down.
6) Surveying – Review the contractor responsible for construction staking and surveying. Receive cut sheets at the end of each day.
7) Soils Report – We will review the soils report and make sure that the recommendations are included in the contract documents, and that the contractor clearly understands his responsibilities. 8) Grading/Building Inspector and Compaction Requirements – We will review responsibilities and procedures if there’s a grading permit and confirm processing and compaction requirements. 9) SWPPP –Discuss the contractor’s SWPPP preparation and meet with the contractor’s QSD/QSP and make sure we are all on the same page regarding reporting and enforcement.

Potential Building Facility Issues:

The key to completing these facilities is to work closely with the local building official. We will meet with them early to discuss processes and procedures.
1) Building Inspection – We will coordinate daily with the City’s building inspector and contractor and report any issues immediately to City for action.
2) Quality Control/Quality Assurance Inspection – The City will however need to have a representative on the site when the buildings are being constructed to perform quality control/assurance inspections of the building. The City building inspector only inspects for code compliance issues and will not inspect the building for “quality of construction” issues, such as drywall and painting finishes. The City needs a representative to provide quality control inspection services to make sure the City is getting a quality project. We routinely work hand in hand with the local building officials and inspectors. 3) Special Inspection – We will work with the City’s building department to submit timely special inspection reports to avoid delay in sign-off.

Potential Irrigation Issues:
1) As-Builts – A critical aspect of the irrigation system is accurate as-builts that will be used by maintenance staff. Nothing is more frustrating than not having accurate information for repairs. Wire numbering, controller information, O&M manuals, location of heads and piping is critical to getting repairs done quickly.
2) Location of Heads – Accuracy and positioning of heads is critical to getting good spray coverage and preventing ‘mud/wet’ spots.

Potential SCE Issues:

Along with grading issues, coordinating with utility agencies, such as SCE, can be a challenge. To reduce this challenge, we invite the planner/maintenance people to our weekly progress meetings.

Construction Management for Arnold Cypress Park Rehabilitation 24 Other Potential Issues:
1) Permits – We will review the requirements and status of all project permits. 2) Schedule – An accurate schedule for this project is critical. There are many moving parts and we will work with the contractor to include all the project elements and assign milestone dates so that we can track each activity.
3) Public Relations -- We will work with the City to implement a public relations program for the project.

Noise, dust, and other construction nuisances must be addressed and kept to a minimum. 4) Communication – We will work with all stakeholders to effectively communicate status of project. 5) Irrigation and Planting -- At the start of construction, Dudek will field verify the static pressure of water service at the connection point supplying the irrigation system. The actual static pressure must be verified with the design static pressure in order to allow for adjustments that may be needed, such as adding a pressure reducing valve, changing nozzles, upsizing the main line, etc. A pre-irrigation/planting preconstruction meeting will be held with the contractor’s landscaper, Dudek, and City staff to discuss installation and testing requirements so the contractor clearly understands the City’s expectations.

Dudek will coordinate regularly with City staff to schedule and perform pre-inspections (verify line depths, solvent welding of joints, proper head/nozzles, and pressure tests) of the work so the City’s time will not be wasted if the work is not ready. In addition to an irrigation coverage test prior to planting, we suggest a water audit performance test be performed to measure the system coverage with catching devises, this will ensure the turf will be receiving sufficient coverage to avoid brown spots. Performing this audit will avoid the need to add additional heads after planting.

Dudek will coordinate City staff of all plant materials upon delivery and prior to any planting. Only healthy, properly sized and high-quality plant specimens will be planted. We also suggest requiring percolation pit testing of each tree well prior to ordering trees to ensure there is sufficient drainage for each tree to prevent drowning and root rot. The contractor will be required to complete all of the irrigation and landscaping work, including all punch list items before the maintenance period can begin. Our proposed inspector has years of experience not only inspecting, but turning over and maintaining active use parks; he understands the City’s needs are to deliver a healthy and well-functioning irrigation and landscaping system.
6) Playground Safety Audit -- Our inspector will check the playground layout to ensure the fall zones do not overlap and that they meet the plan requirements. Once the playground structures and surfacing are complete, we will ensure a playground safety audit is performed on each structure, by a certified CSPI inspector, and that all issues are corrected prior to opening of any of the playgrounds Appendix A
Sample Document Review

ALGA NORTE COMMUNITY PARK - DOCUMENT REVIEW REPORT

PREPARED FOR
Mr. Patrick Mcgarry
City of Carlsbad
405 Oak Avenue
Carlsbad, California 92008

PREPARED BY
Dudek
1645 S. Rancho Satna Fe Road, #201
San Marcos, California 92078
800.450.1818
www.dudek.com
November 10, 2011
Alga Norte Community Park Grading Plans (sheets 4-30) Bridging Document Review Earthwork Plans

1. Review Mass Grading as-builts prepared by City dated March 2011 and As-graded geotechnical report prepared by Ninyo & Moore dated February 2011. Take note of locations of remedial grading, select fill placement and bridged fill locations. Not all remedial grading required was completed during mass grading project. Additional remedial grading or revisions to structural sections may be required. D/B contractor should consult with a professional geotechnical engineer to address areas still needing remediation and addressing possible settlement at bridged fill locations.

2. Shallow groundwater was encountered along the eastern, southern borders and skate park berm of the park below original grade (prior to mass grading project).

3. Additional unclassified fill removals and placement of select fill may be required at Competition pool. Refer to As-graded geotechnical report dated February 2011.

4. D/B contractor should review locations of stock piles – north baseball field topsoil stock pile and western baseball field unclassified fill stock pile along toe of cut slope.

5. D/B contractor should review control files by Mass Grading contractor surveyor Masson & Associates.

6. Grade of the future baseball fields were adjusted (lowered) in order to balance the site during the mass grading project, see as-built topographic survey.

7. Property corner monuments still need to be reset.

8. D/B contractor is responsible for performing own topographic survey to verify grades and earthwork quantities needed to achieve final grades. Import of fill material may be required.

9. Back cut requirements for future retaining wall at the Maintenance Building Yard should be closely analyzed as to not undercut existing sewer and force mains in VWD access road above.

Light impact equipment must be used while working or crossing 12” and 24” force mains at the Maintenance Building Yard.

Utilities

10. D/B contractor should review mass grading plan as-builts for existing storm drains. Storm drains H and G have not been installed. Sections of storm drains E, A-2 and C-5 have also not been installed.

11. D/B contractor should review 72” storm drain installation for conflicts with skate park construction.

12. D/B contractor to address 6” storm drain discharge point at the Skate Park Bowl extending west.

The drain appears to connect to SD “K”, but no POC or IE information is provided. Take careful note of HGL at tie-in location.

13. 3”X8” saddle, gate valve, meter and backflow preventer was installed during the mass grading project at STA 78+02 utilized for the temporary slope irrigation system. Shallow irrigation mainline was buried from backflow preventer to irrigation controller at cut slope behind the pool complex area.

14. D/B contractor should consult with a professional geotechnical engineer at the locations of bridged fill were utilities cross as additional remedial grading or bedding changes may be required.

15. Light impact equipment should be used at any crossing of the 12” and 24” force mains.

16. D/B contractor should verify elevations of existing sewer manhole inverts in Alicante Road prior to designing or building any sewer lines. 12” and 24” force mains should also be potholed at all sewer crossings for potential conflicts.

17. D/B contractor shall clean entire storm drain system prior to park opening.

Alicante Road and DG Trail

18. D/B contractor should perform pavement repairs per City standards along the project alignment and place slurry seal entire road width along project alignment at completion of the project.

19. DG trail along Alicante Road needs to be stabilized.

20. Three rail lodge pole fencing has been installed around the entire alignment of the project along the DG trail.

Grading and Civil Specifications
Site Clearing – Section 02230

21. D/B contractor should consult with a professional geotechnical engineer for depth of topsoil removals.

22. Reference as-graded geotechnical report dated February 2011.

Earthwork – Section 02300

23. Reference As-graded geotechnical report dated February 2011.

24. D/B contractor should consult with a professional geotechnical engineer for subgrade recommendations for additional remedial grading or placement of additional select fill as necessary.

25. ASTM D4829 Standard Test Method for Expansion Index of Soils was used for Mass Grading project.

26. D/B contractor to address pavement(s) and improvement subgrade and design sections in bridged fill areas.

27. Light impact equipment should be used when crossing or working over 12” and 24” force mains.

28. D/B contractor to consult with geotechnical engineer for addressing utilities crossing bridged fill areas.

Water Distribution – Section 02510

29. Reference As-graded geotechnical report dated February 2011.

30. D/B contractor shall pay all required meter fees.

31. D/B contractor to consult with geotechnical engineer for addressing utilities crossing bridged fill areas.

Sanitary Sewerage – Section 02530

32. Reference As-graded geotechnical report dated February 2011.

33. D/B contractor shall verify all sewer manhole elevations prior to starting any other work.

34. D/B contractor shall verify all storm drain and force main crossing elevations prior to starting any other work.

35. D/B contractor to consult with geotechnical engineer for addressing utilities crossing bridged fill areas.

Asphalt Concrete Pavement - 02550

36. Reference As-graded geotechnical report dated February 2011.

37. D/B contractor to consult with geotechnical engineer for addressing pavement section and improvement designs in bridged fill areas.

38. D/B contractor should consult with a professional geotechnical engineer to address areas still needing remediation and addressing possible settlement at bridged fill locations.

Cement Concrete Pavement - 02751

39. Reference As-graded geotechnical report dated February 2011 and Mass grading as-builts dated March 2011.

40. Use latest standards and building codes per City standards.

41. D/B contractor to consult with geotechnical engineer for addressing pavement section and improvement designs in bridged fill areas.

42. D/B contractor should consult with a professional geotechnical engineer to address areas still needing remediation and addressing possible settlement at bridged fill locations.

Alga Norte Community Park Landscape Construction Plans (sheets 232-301) Bridging Document Review Landscape Construction Plans

1. Review Mass Grading as-builts prepared by City dated March 2011 and As-graded geotechnical report prepared by Ninyo & Moore dated February 2011. Take note of locations of remedial grading, select fill placement and bridged fill locations. Not all remedial grading required was completed during mass grading project. Additional remedial grading or revisions to structural sections may be required. D/B contractor should consult with a professional geotechnical engineer to address areas still needing remediation and expansive soils.

2. D/B contractor to address pavement/improvements and subgrade design sections in all areas with professional geotechnical engineer.

3. Grade of the future baseball fields were adjusted (lowered) in order to balance the site during the mass grading project, see as-built topographic survey.

4. D/B contractor should review mass grading plan as-builts for existing storm drains. Storm drains H and G have not been installed. Sections of storm drains E, A-2 and C-5 have also not been installed.

5. City to verify all irrigation controllers, plants, site furnishings, play equipment, fencing and concrete paving colors/finishes shown on plans still meets City’s needs.

6. Site has existing rodent problem, i.e. gopher mounds throughout site and on slopes. Gophers will need to be eradicated prior to planting.

7. Soil mounds in Dog Park were not built up during mass grading and will need to be constructed by D/B contractor.

8. D/B contractor to address pavement and subgrade design sections for basketball court pavement.

9. Project signage shown on the plans appears out dated, City may want to consider providing a signage allowance for park signage to be determined near the completion of the project.

10. Perimeter fence behind Aquatic Complex bleachers is shown on the western side of the concrete brow ditch at toe of slope (sheet LC-31). Fencing will be in the slope behind the bleachers. D/B contractor to address.

11. The City logo for the monument signs and dedication on the plans may be out dated, City should consider providing a monument sign allowance for monument signs to be determined near the completion of the project.

12. City to verify solar structures and panels are up to date for latest technology and City’s preference.

13. Sheet LC-40 has a note referring drainage layout to ‘Sketch CSK-3, Addendum #4 and for sand surfacing subdrain refer to detail E, sketch LC-9, Addendum #4.’ Provide detail or make this a D/B component.

14. City to verify play equipment still meets City needs.

15. D/B contractor to coordinate Point of Connection for irrigation system from Civil Utility drawings with irrigation drawings.

16. Recycled Irrigation plans still need to be approved and signed by the County.

Landscape and Irrigation Construction Specifications
Irrigation Systems – Section 02810

17. City to verify irrigation controller and system components still meets City needs.

Fencing and Gates – Section 02822

18. City to verify fencing type/finish still meets City needs.

Security Fencing and Gates – Section 02825

19. City to verify fencing type/finish still meets City needs.

Site Furnishings - 02870

20. Use latest standards and building codes.

21. City to verify shade structures type/finish still meets City needs.

Playground Equipment - 02881

22. City to verify play equipment still meets City needs.

23. D/B to provide equipment meets latest codes and standards.

Landscaping - 02900

24. Percolation testing and frequency for tree pits should be addressed. Consider allowance for tree drains, if necessary.

25. Site has existing rodent problem, i.e. gopher mounds throughout site and on slopes. Gophers will need to be eradicated prior to planting.

26. Topsoil management needs to be addressed as large stockpile exists on northern ball field and significant amount of top soil to be generated during initial clearing and grubbing of the site.

DG Surfacing - 02970

27. Re-work and stabilization of existing DG trail on Alicante Road should be included in this contract.

Playground Surface Systems - 02790

28. City to verify colors and product still meet City needs.

Synthetic Turf Surfacing - 02791

29. The specification section is a specified D/B component of the project. City to consider adding this as general statement for the entire project.

Synthetic Turf Subsurface Construction - 02792

30. The specification section is a specified D/B component of the project. City to consider adding this as general statement for the entire project.

31. City to clarify who will be performing geotechnical testing.

Alga Norte Community Park Structural Plans (sheets 145-157) Bridging Document Review
Comments:

Contract Drawings
DWG S2.1 - Corrected

1. Indicates dimensions for Building 1, line C to C.4 = 13’-4” and C.4 to E = 27’-4”.

This conflicts with plan sheet A1.1 which indicates 15’-4” and 25’-4”. Plan sheet A1.1 does not include a grid line A.9.

DWG S2.1 - Corrected

1. Indicates a dimension for Building 1, line D to E = 10’-0”. This conflicts with plan sheet A1.1 which indicates 11’-4”. Plan sheet S2.1 does not include a grid line D.2.

DWG S2.2 - Corrected

1. Indicates a dimension for Building 2, line C to E = 38’-0 1/2”. This conflicts with plan sheet A2.1 which indicates 38’-0”.

DWG S2.4 - Corrected

1. Indicates detail 14/S4.3 for the exterior trellis. However, there is no detail 14/S4.3. This should be changed to detail 13 or 15/S4.3.

Details on the steel Erection, Bolting and Welding
DWG S3.2

1. Detail 7 needs to show field or shop welds.

Corrected

2. Detail 16 shows no grating attachment.

Not Corrected

3. Detail 19 Handrail embedment not shown on details 17, 18, 19/S3.2.

Corrected
DWG 10/S4.2

1. Should the beam holes be slotted in order to install because of the hard point and variance of the dimensions & welds to accent the anchor bolt holes that have been slotted.

Comment not addressed
DWG 10&6/S4.2

1. These are critical points of the roof connections maybe full penetrations or partial penetrations in order to maintain structural integrity a fillet weld on a kinked connection doesn’t seem to be approved joint in AWS D1.1 Section 4.0.

Comment not addressed

2. The identification of weld sizes whether shop or field, code states all welds 5/16” and above must have full time special inspection by a qualify AWS/ CWI, ICC Steel, And City of San Diego certification and must be current.

DWG AS7.2

1. Details of the grating infill need to show attachments on details on DWG AS7.2 #13.

Comment not addressed

2. Angle deck support not called out.

Comment not addressed

3. Gate post anchors on AS7.2 consider anchor bolt or welded connection.

Comment not addressed
New Comments
DWG AS1.1

1. Connections nailing schedule Item # 3 – Review live load/dead load limit on 1X6 subfloor joists
DWG AS1.2

1. Detail # 18 – No schedule for imbed distance from end of sole plate DWG AS3.2

1. Detail 17,18,19 – No waterproofing on masonry retaining wall

2. Detail 9 – No waterproofing on surge chamber walls
DWG AS4.3

1. Detail 15 – Lag Bolt offset distance on 4X8 sleepers too close DWG AS4.4

1. Detail 13A & 13 – 2X6 sloped ledger, Review live load/dead load limit with studs at 24” O.C.

Alga Norte Community Park Skate Park Plans (sheets 216-231) Bridging Document Review Skate Park Plans

1. Review Mass Grading as-builts prepared by City dated March 2011 and As-graded geotechnical report prepared by Ninyo & Moore dated February 2011.

2. Shallow groundwater was encountered along the eastern, southern borders and skate park berm of the park below original grade (prior to mass grading project).

3. D/B contractor should consult with professional geotechnical engineer to determine if relief drains for skate park bowels are necessary.

4. D/B contractor should review control files by Mass Grading contractor surveyor Masson & Associates.

5. D/B contractor is responsible for performing own topographic survey to verify grades. Import of fill material may be required.

6. D/B contractor should verify elevation top of 72” storm drain to be located under skate park.

7. D/B contractor to address 6” storm drain discharge point at the Skate Park Bowl extending west.

The drain appears to connect to SD “K”, but no POC or IE information is provided. Take careful note of HGL at tie-in location.

Skate Park Specifications
Earthwork Skate Park – Section 02200

8. D/B contractor to verify elevation of existing 72-inch storm drain.

9. D/B contractor should consult with a professional geotechnical engineer for subgrade recommendations.

10. Reference as-graded geotechnical report dated February 2011 for stabilizing rock fill placed below the skate park berm.

Subgrade Preparation Skate Park – Section 02330

11. Reference As-graded geotechnical report dated February 2011.

Cast-in-Place Concrete Skate Park - 03310

12. Reference As-graded geotechnical report dated February 2011.

13. Use latest standards and building codes per City standards.

Shotcrete Skate Park - 03370

14. Reference As-graded geotechnical report dated February 2011.

15. Use latest standards and building codes.

Metal Fabrications Skate Park - 05510

16. Owner to specify materials and finish for exposed steel pipe coping – should be stainless steel or galvanized, specifications currently specify painted steel.

17. Use latest standards and building codes.

Ornamental Metals Skate Park - 05710

18. Owner to specify materials and finish for fencing materals.

Painting Skate Park - 09910

19. Owner to specify materials and finish for exposed steel pipe coping – should be stainless steel or galvanized, specifications currently specify painted steel.

HonourGroup
General Building Contractor
Construction Management
Lic# 613752
Memorandum
To: Dudek & Associates, Inc. Date: February 23, 2007
Tel: 760-744-4578
Fax: 760-744-4570
Attn: George Litzinger
From: Eric Honour Cell: 760-889-7429
Email: [email protected]
Proj: Alga Norte Community Park
Plan Review Comments
Message:

Per your request, we have we have undertaken a review of the contract plans for the subject project in an effort to identify potential plan or logistical discrepancies and apply standard construction means and methods to the work indicated. Check for action on listed items 11-2-11. Action shown in red.

After careful review and consideration, we offer the following comments:

1. AS7.4 indicates steel fence and gates which occur between buildings 1, 2, 3 and 4. The referenced details, 18 & 19/AS7.3 illustrate a mounting bolt on the inside face of the tube steel tube and state:
“Anchor Bolt Per Structural”. No information regarding this work found on the structural plans, including bolt size or spacing. The referenced details indicate the mounting bolt is located inside the steel tube. In order to install a bolt in this way, a hole larger than the bolt and washer would need to be drilled or cut in the outside wall of the tube and then patched in the field after installation of the tube. There is no reference on the plans regarding access to this bolt or patching of the steel tube. Detailing not complete.

Some access holes shown in some detail but not others.

2. AT2.2 indicates emergency egress for Building 2. It appears that the doors for rooms 213 and 214 swing against the designated path of egress. This conflicts with the egress requirements indicated on plan sheet AT3.1 …Exits… Note# 5. No change required due to room occupancy load.

3. AS3.1 indicates that the acoustic ceiling height in the Snack Bar 609 is 10’-0” aff and the bottom of truss is also 10’-0” aff. Plan sheet E4.1 indicates two 2x4 light fixtures located in Room 609. It appears that there is insufficient space between the bottom of truss and the acoustic ceiling grid to accommodate the light fixtures. No electrical plans to check.

4. A2.6 indicates the bottom of truss for Building 2 is 11’-0” aff. Plan sheet A2.3 indicates that most of the acoustic ceiling is at 10’-0” aff. Plan sheet M2.1 indicates that most of the HVAC ducts are at least 14” high. It appears that there is insufficient space between the bottom of truss and the acoustic ceiling to accommodate the HVAC ducts. Not corrected.

5. A1.3 indicates two 30” x 30” access panel in the ceilings of Rooms 108 and 109. Plan sheet S2.1 indicates roof trusses at 24” o/c. There is no structural detail indicating the framing for this 30” opening.

Corrected.

Continued
Dudek & Associates, Inc.

Alga Norte Community Park
Plan Review Comments-Page 2 of 6
February 23, 2007(11-2-11)

6. A3.1a. indicates a mezzanine located over Rooms 309b., 311 & 311a. which is accessible through a 30”x30” ceiling access panel. The location of the access panel shown on A3.1a conflicts with the location indicated on A3.3. Either location conflicts with other components including the roof access ladders and EF 3-7 & 3-8 shown on M3.1. The mezzanine deck framing consists of 2x12 at 16” o/c. There is no structural detail indicating the framing for this 30” opening. Not corrected.

7. A3.6a indicates two round ducts occurring within the roof trusses located in Room 301. This detail implies that the two main ducts occur on either side of the ridge line. However this conflicts with M3.1 which indicates a single main duct located near the middle of the room with branch ducts to ceiling diffusers on both side of the ridge line. It appears that there is insufficient space to accommodate the duct above the ceiling. Corrected.

8. S2.1 indicates dimensions for Building 1, line C to C.4 = 13’-4” and C.4 to E = 27’-4”. This conflicts with plan sheet A1.1 which indicates 15’-4” and 25’-4”. Plan sheet A1.1 does not include a grid line A.9. Corrected.

9. S2.1 indicates a dimension for Building 1, line D to E = 10’-0”. This conflicts with plan sheet A1.1 which indicates 11’-4”. Plan sheet S2.1 does not include a grid line D.2. Corrected.

10. S2.2 indicates a dimension for Building 2, line C to E = 38’-0 1/2”. This conflicts with plan sheet A2.1 which indicates 38’-0”. Corrected.

11. FS-2.1 indicates a mop sink and floor drain located near grid lines E/5. The plumbing plans do not show water or sewer available at this location. No FS plans to check.

12. FS-2.1 indicates floor sinks for specific equipment locations in the Kitchen. The locations and quantity of these floor drains conflict with those indicated on plan sheet P4.1. No FS plans to check.

13. FS-2.1 indicates floor drains located in the Kitchen. These locations do not match the locations indicated on plan sheet P4.1. No FS plans to check.

14. FS-1.1 indicates a ¾” gas service to item# 68 “Broiler”. The plumbing plans do not provide gas service to this area. No FS plans to check.

15. FS1.1 indicates several gas safety shut off valves located within the building. These valves are not included in the plumbing plans. No FS plans to check.

16. P4.1 shows the elevation of Building 6 at 129.00FF. Plan sheet C10 indicates 128.40FF. Not corrected.

17. P4.1 shows the elevation of Building 7 at 155.50FF. Plan sheet C5 indicates 155.00FF. Corrected.

18. P5.1 shows the S/E corner of Building 1, (Mens & Women) at 149.00FF. Plan sheet C6 indicates 148.50FF. Corrected.

Continued
Dudek & Associates, Inc.

Alga Norte Community Park
Plan Review Comments-Page 3 of 6
February 23, 2007(11-2-11)

19. P1.1 shows the invert elevation for the roof drain connection from Building 1 to site piping is 148.50. This is too high for the finish grade in this area. Per plan sheet C6, FG = 147.70+/-. Corrected.

20. 2/P5.1 shows waste piping extending through the north wall of Room 104 in Building 1. The note states “See P1.1”. There is no reference to this pipe extension on P1.1. Additionally, the detail indicates an IE of 146.00 at the footing with at note stating “sleeve waste line below structural footing”. Per 12/S1.1 the IE must be at least 145.00 to comply with note. Not corrected.

21. C5 shows a 6” storm drain at the Skate Park Bowl extending north with and IE of 147.00 at the apparent discharge point. The TG elevation at the drain is 142.99 per 12/SP-3.3. This would cause water to flow into the bowl. The drains in the other bowls appear to connect to SD “K”, but no POC or IE information is provided. Civil plans checked by others.

22. C16 water note 11 states that a minimum of 10’ spacing is required between potable water and sewer lines. This conflicts with the locations for water and sewer in Buildings 2 and 3 per P2.1 and P3.1. .

Civil plans checked by others.

23. C17 shows an IE of 143.00 at the Building 1 sewer connection. P1.1 indicates the IE is 146.00. .

Civil plans checked by others.

24. C17 shows the TG elevation for the 6” roof drain/storm drain connection south of Building 1 is 148.70. This conflicts with the FF elevation of Building 1 per C6, (148.50). . Civil plans checked by others.

25. C19 and C21 show significant portions of the sewer and storm drain piping is designed with less then 2% fall. In some areas the slope of pipe is .005%, (1/16” per foot). The industry standard minimum slope for these piping systems is 2%. This lack of minimum slope reduces the velocity of the liquid in the pipe resulting in frequent sediment build up and potential pipe blockage. . Civil plans checked by others.

26. LC13 shows a wheel chair ramp located near the baseball fields. The details refer to the civil plans for top of wall elevations. The civil plans do not include the required elevation information. . Civil plans checked by others.

27. DP-1 shows the elevation for the 18” SD TG at the N/E corner of the Competition Pool is 149.95.

C6 shows this TG at 149.00. Also, the 18” SD piping shown on the north and east sides of the Competition Pool is 30” diameter per C17. . Civil plans checked by others.

28. DP-1 note states: “P.O.C. to 8” SS with Running Trap. See Sheet C10.0” in two locations. C10 is the grading plan for the S/E corner of the site and is apparently not the correct reference. C17-Utility Plan does not indicate these two connections. . Civil plans checked by others.

29. The plans and specification refer to the geotechnical report numerous times for specific items such as concrete base material, treatment of structure subgrade, suitability of onsite soil for re-use, etc. The specifications do not contain the geotechnical report. Soils report checked by others.

Continued
Dudek & Associates, Inc.

Alga Norte Community Park
Plan Review Comments-Page 4 of 6
February 23, 2007(11-2-11)

30. A1.1 indicates detail 05/AS7.3 for the fence detail. It appears that the correct detail reference should be 05/AS7.4. Corrected.

31. S2.4 indicates detail 14/S4.3 for the exterior trellis. However, there is no detail 14/S4.3. This should be changed to detail 13 or 15/S4.3. Corrected.

32. The Landscape Architect’s stamp on the plans is expired. Landscape plans checked by others.

33. The Structural Engineer’s stamp on the plans is expired. Not corrected.

34. T-3, Notice to Contractor-Playground Area. Typo in second paragraph, change Chula Vista to Carlsbad. Title pages checked by others.

35. Specification Section 02200-1.6 Earthwork-Skate Park states that all soils testing, except for chemical or agricultural suitability, shall be paid by the Contractor. This conflicts with section 01450-1.10 Testing Laboratory Services, which indicates that the Owner will pay for soils testing. Grading specs checked by others.

36. Specification Section 10416, 1.2 A-Wall Clocks states: “Provide…Radio Controlled Atomic Clocks…as located on the drawings…”. The plans do not include any reference to these clocks, including location and/or quantity. Grading specs checked by others.

37. A review of the Contractor’s Proposal form included in the City of Carlsbad Contract Documents and Supplemental Provisions section of the specification book indicates a unit price bid schedule.

However, it appears to be for a different project. The schedule is broken down into two segments, Schedule “A” Road Improvements and Schedule “B” Leucadia Sewerline. Both schedules include items not found on this project and neither schedule includes the buildings or site improvements indicated on the plans Grading specs checked by others.

38. A review of the Project Specification-Table of Contents indicates several specification sections in divisions 2, 3, 5 & 9 that are apparently related to the Skate Park exclusively. In some cases such as earthwork, there is a section for the Skate Park, 02200, and another section presumably for all other areas within the project, 02300. In this case, it appears that there is duplication of requirements within the two sections as well as conflicts. In other cases, such as 03310 Cast in Place Concrete-Skate Park, there is no other section for the other CIP concrete required on the project. There are also two painting sections included, both have the same section number, 09900. TOC checked by others.

39. The suitability of the onsite soils for re-use onsite is not clearly defined. Section 8.1.6. of the soils report, (Ninyo & Moore dated 6-14-06), states: “On-site soils with an organic content of less then 3% by volume, (or 1% by weight), are suitable for use as fill.” . Appendix C, Figure C-7 of the report indicates that the existing onsite soil encountered at TP-7 and TP-10 has an expansion index of 130 & 108 and is considered to have a “high” expansion potential. The only other expansion test result for existing onsite soil is found in Appendix D, Figure B-7 which indicates an expansion index of 78-Medium for B-2.

Based on this information, it appears that some or all of the onsite soil is not suitable for re-use onsite.

Soils report checked by others.

Continued
Dudek & Associates, Inc.

Alga Norte Community Park
Plan Review Comments-Page 5 of 6
February 23, 2007(11-2-11)

40. The Remedial Grading plans state: “Alluvium in structural areas will be removed to a depth of 12 feet from bottom of structure, or within 5 feet of ground water.”. The test borings for the soils report were performed almost 5 years ago. These borings only show two isolated pockets of ground water throughout the entire site. The current report indicates isolated ground water at TP-12. Because the limits of remedial grading are based in part on the ground water level, the overall scope of work is subject to change due to the actual ground water level at the time of construction. The current ground water level for all areas of remedial grading should be verified prior to the project bid and the limits of grading clearly defined. Soils report checked by others.

41. C-1 indicates the estimated quantities of earthwork for the project. Presuming that all of the existing onsite soil is suitable for reuse, it appears that there will be a surplus of approximately 31,000 cy of soil which would require export from the site. Section 8.1.3. of the soils report recommends placement of soil, (with expansion index less then 50), “in structural areas on the site to a depth of 3 feet below the bottom of foundations or pool shells…”. Based on the soil test results, (see item 39 above), it appears that none of the existing onsite soil would satisfy this expansion index requirement. The extent of import and/or export of soils is not clearly defined. Soils report checked by others.

42. Section 8.7, Table 2 of the soils report recommends using 4 inches of asphalt concrete over 11 inches of Class II base for the Access Roads and 3 inches of asphalt concrete over 10 inches of Class II base for the Parking areas. This conflicts with the grading plans which indicate 3 inches of asphalt concrete over 7 inches of Class II base for the Access Roads and 3 inches of asphalt concrete over 6 inches of base for the Parking areas. Soils report checked by others.

43. Section 8.4 of the soils report recommends using a subdrain to relieve potential hydrostatic pressure at retaining walls, (Fig 4). The retaining walls indicated on Plan sheet LC-13 do not include a subdrain. Soils report checked by others.

44. Specification section 02881-Playground Equipment appears to be a specification template that has not been completed. There is no information or reference in the specification regarding the specific playground equipment indicated on the plans. Playground equipment checked by others.

45. Regarding substitutions of proprietary items, specification section 02875-Site Pre-Engineered Shelter Structure, paragraph 2.2.2 states: “Substitutions must be approved 10 days prior to the bid. All approved manufacturers shall be notified in writing before the bid date and shall not be allowed to bid without written certification.”. Numerous proprietary specifications are found throughout the landscape plans and specifications, including: Resilient Surfacing at Play Areas, Playground Equipment, Playground Equipment Certification, Shade Structures, Pre-cast Concrete Items, Dog Park Accessories, Baseball Accessories, Basketball Accessories, Water Slide, etc Proprietary specifications checked by others.

46. The landscape construction plans indicate several types of concrete paving of variable thickness.

The limits of the individual areas of paving type and thickness are not clearly defined. The graphic legend on all pages appears faded and difficult to read. Landscape plans checked by others. Landscape plans checked by others.

Continued
Dudek & Associates, Inc.

Alga Norte Community Park
Plan Review Comments-Page 6 of 6
February 23, 2007(11-2-11)

47. LC-10 & 11 shows the Landscape Construction-Material & Finish Schedule on sheet LC-10. The right column states: “See Project Specs” for every item. Contrary to the note, it appears that some of these items do not have a corresponding specification section. The items are:

22. Basketball Standard (added) 51. Aquatics Complex Bleachers (checked by others)

23. Basketball Rim (added) 52. Skate Edge Prevention Treatment (checked by others)

24. Basketball Backboard (added) 53. Tree Grate (checked by others)

25. Basketball Surfacing(added) 54. Palm Grate (checked by others)

29. Baseball Bleachers (not added) 55. DG Infield Mix (checked by others)

50. Flagpole(added) 56. DG Warning Track Mix (checked by others) 57-59 Landscape Boulders (checked by others)

48. DP-1 & DP-2 do not include any information on concrete paving thickness. These plans checked by others.

49. DP-1 & DP-2 show “Enhanced Paving” between Building 2 and the Wet Play area. The limits and locations of each type of paving are not clearly defined. Provide dimensions and radius. These plans checked by others.

50. DP-1 shows “Enhanced Paving” running through the lobby and courtyard of Building 2. A2.1 does not indicate any enhanced paving within the building. These plans checked by others.

51. DP-2 stairs to waterslide area has a low spot with no apparent drainage, (154.05). These plans checked by others.

52. DP-2 shows an 18” high Seat Wall near the Therapy Pool and Continuous River. There is no reference to these items on LC-3 & 4. These plans checked by others.

53. WP-1 shows an 18” wide x 15” tall seat Wall at edge of Wet Play. No detail is provided. These plans checked by others.

54. 7/WP-3 shows a CIP concrete “Balance Tank” for the Wet Play area. The detail indicates the top of the tank is flush with the surrounding paving. DP-2 shows this tank located in the enhanced paving area and the referenced detail does not indicate colored concrete for the top of the CIP tank. These plans checked by others.

55. 8/WP-3 shows suction piping at the Wet Play main drain. WP-2 shows this pipe as a gravity drain with 1% slope to the Gutter Outlet. These plans checked by others.

WP-2 shows a 4” Booster Pump Return and 4” Suction for the Wet Play area. MR-1 shows these pipes as 3”. These plans checked by others.

If you have any questions, please contact me.

Thank You,
HonourGroup
Eric Honour
Continued
DUDEK
Alga Norte Community Park
Specification Review
November 2, 2011

1. Most specification sections refer to Related Documents: “General provisions including general and supplemental conditions and Division 1 specification sections apply to this section.” There are no General Provisions included in the specification book. This statement should be deleted from all specifications.

2. Section 06100 Rough Carpentry is included twice in the specifications.

3. Section 09100 Metal Support Systems is included twice in the specifications.

4. Section 09220 Plaster. No minimum duration specified for plaster cure.

5. Section 09260 Gypsum Assemblies is included twice in the specifications.

6. Section 09661Grafitti Coatings is included twice in the specifications.

7. Section 10505 is titled Metal Lockers, however the specified lockers are solid phenolic.

8. Section 10165Toilet Partitions is included twice in the specifications.

9. Section 10525 High Security Key Boxes is included twice in the specifications. 4722 Birchwood Circle Carlsbad, CA 92008 Tel/Fax 760-720-9414 www.honourgroup.us 800.450.1818 | [email protected]
DUDEK.COM

CITY OF CYPRESS
Construction Management for the
Arnold Cypress Park Rehabilitation

ESENCIA SPORTS PARK
FEBRUARY 25, 2022

CYPRESS LEXINGTON PARK

T H I S P R O J E C T I S C U R R E N T L Y B E I N G

M A N A G E D B Y O U R P R O P O S E D G R I F F I N
TEAM, SET TO OPEN MARCH 2022.

Project
Arnold Cypress Park Rehabilitation
Submitted By
Griffin Structures
Date of Submittal
February 25, 2022
Proposal Contact
Jon Hughes
Principal-In-Charge & Executive Vice President of Operations P: (949) 497-9000 x208
[email protected]
1 TECHNOLOGY DRIVE, BUILDING I, SUITE 829 | IRVINE, CA | 949.497.9000 | GRIFFINSTRUCTURES.COM February 25, 2022
City of Cypress
5275 Orange Avenue
Cypress, CA 90630
RE: Request for Proposal for Construction Management Services for the Arnold Cypress Park Rehabilitation project Dear Mr. Mangkalakiri and Evaluation Team,
As Griffin Structures celebrates 41 years of providing award-winning Program and Construction Management (PMCM) services, we are pleased to submit our proposal to the City for the Arnold Cypress Park Rehabilitation project. As you will discover within our proposal, our demonstrated team is uniquely qualified to deliver this particular project given our extensive active-use sports park portfolio, City knowledge and past teaming experience, local presence, a wealth of internal resources, and public agency expertise.

We offer a diverse team of seasoned parks experts to the City, led by long-time City partner and Construction Manager Robert Echavarria. Formally trained in landscape architecture and has completed many of the state’s largest active-use sports parks and recreational facilities. Robert Echavarria will lead this project from Design Document Review, through construction, and turnover, supported by a wealth of parks experts as we navigate throughout the project. Our project support team includes Lance Solomon, who successfully managed the $52M Lake Forest Sports Park project, Robert Godfrey, who has managed (along with Robert Echavarria) over 14 The Trust for Public Land park projects valued in excess of $25M, and Cody Roth, who collaboratively delivered the $20M Esencia Sports Park project along with many of our proposed team members.

Our portfolio features the City of Cypress’ Lexington Park project approaching completion in March 2022, as well as the Mackay Park and Community Center. These projects granted our team the unique opportunity to develop a deep understanding of the City, your culture, and your approach to project management, which we will harness to exceed the City’s expectations for this project.

TO SUMMARIZE, WE OFFER THE FOLLOWING KEY BENEFITS:
• A project team with unparalleled experience in your exact project type, ranging in value from >$5 million to over $110 million publicly funded dollars.
• A project team with extensive active-use sports parks, and public sector experience. • A collaborative, streamlined project delivery process to ultimately reduce your administrative costs and ensure timely delivery.

Griffin Structures takes great pride in providing both competitive pricing and highly qualified personnel and goes to great measures to ask, “What is our true value-added proposition to the City of Cypress?”. The answer to this question is our people. We bring a higher caliber of Project and Construction Manager to our clients - one that is trained as a builder but thinks like an owner. Our people offer creative delivery options, solutions-based recommendations, and a true perspective of ownership that our competitors do not possess. For this reason, we are able to provide a single point of contact at a senior level that is capable of delivering enhanced services at a competitive rate. This is our differentiator, and the meaning behind the Griffin Structures pledge to provide excellence in project delivery.

Jon Hughes, Principal-In-Charge & Executive Vice President of Operations P: (949) 497-9000 x208 | E: [email protected]

STRATEGIC CONSIDERATIONS
Griffin Structures goes to great lengths to research and understand the challenges and opportunities for every pursuit. As a result of this effort, we have prepared the following strategic considerations to demonstrate our approach and illustrate the value we offer. These considerations are prepared in a question-and-answer format for ease of reading.

Question: How will the Construction Management team ensure this project is delivered on time? Answer: In our opinion, achieving timely delivery is one of the most critical aspects of this project. To do so, Griffin will employ a few essential management tools:

Offer timely response to all issues and questions: No other project component has a more significant potential to cause delays than poor communication. Therefore, timely response to submittals, RFIs, and quick resolution of field issues will be paramount for this project. In preparation for the 2022 NFL Super Bowl, Griffin Structures managed the timely completion of the City of Inglewood’s Emergency Operations Center – a critical aspect of the event’s safety operations. Due to our timely response to all issues, foresight, and experience managing aggressive schedules, we completed this project just in time for the event.

Long Lead Procurement: Long lead procurement oversight will be critical for this project. Any potential materials (specifically site lighting) will need to be forecasted early, prior to construction. In addition, a detailed procurement schedule will need to be produced to efficiently ensure the Contractor has properly identified those items that could impact the schedule.

Operations and Maintenance: Griffin recognizes that the turnover must be as equally efficient as the construction with a project such as this. Therefore, we will engage City maintenance crews early on in the process to ensure the turnover is seamless and efficient.

Question: How can the City be assured the project budget is maintained and that all project costs are properly managed? Answer: Based on our experience with projects of this type and our experience working with the City of Cypress, Griffin is confident we can provide the highest level of financial oversight to the City. This will be achieved by managing and avoiding changes before they occur, providing guidance on systems and specifications that may be customized and/or above industry standard price, strict enforcement of the contract as it relates to Contractor change orders, and proactive issues resolution to allow for the efficient deployment of work in the field. Together, these mitigation efforts will ensure the City’s budget and the constituents’ resources are properly managed.

Question: How might the condition of the existing utilities impact the project, and how can the City rest assured utilities have been properly marked?
Answer: Due to the age of the park site, the plans and the City’s “as-built” plans may not adequately identify or locate all existing underground utilities, potential abandoned lines, or structures that may exist. Though the plans place the responsibility on the Contractor to locate and mitigate these potential unknown items, change orders may be required when the extent of the additionally required work is determined. The City may consider a contingency bid item or initiate “potholing” before construction to avoid additional costs and potential delays to the project schedule. Should the City wish to pursue this approach, Griffin Structures is prepared to oversee and facilitate this effort and support the Design Team in the inclusion of this information into the plans and specifications.

Question: Given the park’s proximity to the surrounding neighborhood, what strategies might the City employ to mitigate impacts to the community?
Answer: The local community will be losing the use of this park until completion. Therefore, communication with the adjacent residents must be a priority throughout the construction process. Griffin Structures will establish a communication process for neighbors to register concerns and receive proactive notices of specific site activities that may interfere with their neighborhood activities. Additionally, our Construction Manager is ready to act as the front line in communicating with local residents daily on behalf of the City.

LAKE FOREST SPORTS PARK & RECREATION CENTER

W H Y G R I F F I N
STRUCTURES?
4 0 + Y E A R S O F

P U B L I C S E C T O R

EXPERIENCE

C O M P L E T E D

P A R K S V A L U E D I N
EXCESS OF $10M

H A N D S - O N

E X P E R I E N C E W I T H

THE CITY

S T E L L A R

R E P U T A T I O N F O R

T I M E L Y D E L I V E R Y

O N B U D G E T

I N - H O U S E

P A R K S , E S T I M A T I N G
& O U T R E A C H

EXPERTS

U N P A R A L L E L E D

A C T I V E - U S E S P O R T S

PARK PORTFOLIO

TABLE OF CONTENTS
Firm Information 1
Experience 5
Project Understanding & Approach 24
Appendix 30

CONFIDENTIAL
California Civil Code § 3426.1 (d); California Evidence Code section 1040 and 1060; California Government Code section 6254(k); Freedom of Information Act, 5 U.S.C. § 552(b)(4) D O N O T R E L E A S E W I T H O U T G R I F F I N S T R U C T U R E S ’

C O N S E N T A N D R E D A C T I O N S

1. FIRM INFORMATION
“ G R I F F I N D I D A N E X C E L L E N T J O B T O
E N S U R E T H E C I T Y ’ S B E S T I N T E R E S T S W E R E M E T . T H E I R D E T A I L E D R E V I E W

O F C H A N G E O R D E R S E N S U R E D T H E

C I T Y G O T E X A C T L Y W H A T W E P A I D

F O R A N D T H A T T H E P R O J E C T S T A Y E D
WITHIN BUDGET.”
- CITY OF IRVINE

E X C E L L E N C E I N P R O J E C T

DELIVERY
Griffin Structures is a diversified Program,
Project, and Construction Management/Owners
Representative firm serving public, private, nonprofit, and institutional sectors. Our mission is to deliver unparalleled service that not only unlocks
revolutionary discoveries but allows clients to
achieve their immediate and future goals to enrich
the lives of the people they serve.

A unique aspect of our firm is our
deep roots and vast portfolio in parks
management from programming to
construction completion.

The public, private, and non-profit active-use
sports parks project experience of our team is
unparalleled. In this proposal, you’ll also notice a
Cypress Lexington Park
Cypress Mackay Park
The Trust for Public (TPL) Projects
Esencia Sports Park
Rialto Frisbie Park Expansion
Quincy Jones Green Alley Network
Zamora Park
Bicentennial Park
Watts Serenity Park
Rudolph Park
Central Jeff. High Green Alley Network
Bradley Plaza Green Alley Network
Patton Street Park & Garden
Avalon Green Alley Network
Madison Ave Park & Community Garden
South Victoria Avenue Park
Benito Juarez Park
LA River & Aliso Creek Confluence Park
Carlton Way Pocket Park
Burlingame Washington Park
Lake Forest Sports Park & Rec. Center
Marina Park Community & Sailing Center
Silverlakes Equestrian & Sports Park
South Gate Urban Orchard Park
Brea Sports Park
Watsonville Ramsay Park
Vernola Park & Community Center
Westminster Buckingham Park
Westminster Sigler Park
Westminster Magnolia Street Park
Westminster Russell C. Paris Park
Westminster Liberty Park
LANLT, Wishing Tree Park
Quail Hill CC & Nature Preserve
Yorba Linda Adventure Playground & Park
Rancho Santa Margarita Civic Center Park
RPV Ladera Linda CC & Park
Carlsbad Pine Ave CC & Gardens
Delhi CC & Community Park
Half Moon Bay Carter Park
Hesperia Civic Plaza Park
Santa Ana Parks & Rec On-Call Parks
Fullerton Hillcrest Park
Dixon Hall Memorial Park
Tustin Peppertree Park
Glass Creek Park
Summerwind Sports Park
Heal the Bay McKinley Place Park
San Leandro Shoreline Park
Nevada PLMA Trails & Parks Program
Rancho Cucamonga Sports Center

REPRESENTATIVE PARKS EXPERIENCE
F irm I nformation GRIFFIN STRUCTURES 1
Our portfolio features the
City’s Lexington Park project
approaching completion
March 2022, Mackay Park, and
Community Center. These
projects have granted our team
the unique opportunity to
develop a deep understanding
of the City, your culture, and
approach to project and
construction management.

Marguerite Aquatics Center
Lawndale Community Center
Seal Beach Aquatics Center
Great Park Ice & FivePoint Arena
San Bruno Recreation & Aquatics Center
Mtn View Rengstorff Park Aquatic Center
Piedmont Aquatic Center
East Bay RPD Aquatic Center
Terra Lago Community Recreation Center
El Centro Dr MLK Sports Pavilion
College Park Aquatic & Recreation Center
Fullerton Tennis Center Pavilion
Lompoc Sports Complex
San Dimas Swim & Racquet Club
PLMA Trails & Parks
Henderson Union Pacific Railroad Trail
Las Vegas Regional Trails & Trailheads
F irm I nformation GRIFFIN STRUCTURES 2
THE PROJECT TEAM WILL BE MANAGED BY:
• Roger Torriero, Principal-In-Charge, and Jon Hughes, Project Executive, providing oversight to;
• Robert Echavarria, Construction Manager, utilizing his parks expertise, formal landscape architecture knowledge, and City experience to deliver a successful project supported by;
• Griffin Structures Project Resource team inclusive of Lance Solomon, Front-End Document Specialist, Cody Roth, Code Compliance Specialist, Robert Godfrey, Constructability Review Specialist, and Jay Helekar, Cost Estimator;
• Aron Taylor and Matthew Farrington with GMU for Special Inspections & Testing
With certifications from the Design-Build Institute of America (DBIA), Construction Management Association of America (CCM), and the U.S.

Green Building Council (LEED AP), Griffin Structures employees are trained as Owner’s Representatives, are experienced and highly trained to provide exceptional services to our Clients.

F irm I nformation GRIFFIN STRUCTURES 3
Robert Echavarria
CCM
Construction Manager
Jon Hughes

CCM, DBIA
Project Executive
Roger Torriero
Principal-In-Charge

PROJECT SUPPORT
Lance Solomon, CCM
Front-End Document Specialist
Cody Roth
Code Compliance Specialist
Robert Godfrey, CCM
Constructability Review Specialist
Jay Helekar, LEED AP
Cost Estimator

SUBCONSULTANTS
GMU Geotechnical
Special Inspections + Testing
GRIFFIN STRUCTURES 4

2. EXPERIENCE
“ G R I F F I N S T R U C T U R E S P R O V I D E S

H I G H Q U A L I T Y C O N S T R U C T I O N

M A N A G E M E N T A N D I N C R E A S E D

O U R C A P A C I T Y T O O V E R S E E

M U L T I P L E C O M P L E X P R O J E C T S
S I M U L T A N E O U S L Y . T H E Y A R E

C O L L A B O R A T I V E , D E T A I L O R I E N T E D

A N D R E A D I L Y A V A I L A B L E

W H E N E V E R T H E R E I S A N I S S U E O N A
CONSTRUCTION SITE.”
- THE TRUST FOR PUBLIC LAND
Lexington Park

CYPRESS, CA
The proposed park is located at the
southeast corner of Lexington Avenue
and Cerritos Avenue in the City of
Cypress. The property is a trapezoidal
shaped parcel with an approximate area
of nine acres, approximately 720 feet by
550 feet.

Once completed, the project will
feature both natural and synthetic turf
fields, multi-use courts, child and tot
play areas, exercise stations, picnic
shelters, maintenance and storage areas,
bleachers, and associated amenities
The proposed sports park is bounded
by commercial uses to the west, horse
stables to the south, a preschool and
residential housing to the north, and
stables and miscellaneous equipment and
facilities associated with the Los Alamitos
Race.

This project is currently being managed by
Robert Echavarria.

VALUE
$13,200,000
SIZE
9 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
City of Cypress
Jeff Draper
Director of Recreation and
Community Services
(714) 229-6785
[email protected]
E x perience GRIFFIN STRUCTURES 5
Esencia Sports Park

LADERA RANCH, CA
Designed to fit into a tiered landscape
concept, Esencia Sports Park is a 30-acre
multi athletic park site in one of Rancho
Mission Viejo’s newest communities.

The lower park site encompasses two
lighted baseball fields and one lighted
softball field with supporting amenities,
including covered dugouts, attached
bullpens and soft toss cages, tiered
concrete spectator seating, batting
cages and scoreboards. A lighted
multi-use soccer field with tiered
concrete spectator seating and a 1,500
SF concession/restroom building and
leisure pool support the team sports
uses.

The lower park also includes a children’s
tot lot and play features. The upper park
site encompasses two lighted tennis
courts, two lighted pickleball courts, a
swimming pool with three swim lanes,
splash pad, and a 1,500 SF pool building
with barbecues, fire pits, and cabanas.

This project was managed by Robert
Echavarria with support from Lance
Solomon and Cody Roth.

VALUE
$20,000,000
SIZE
30 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
Rancho Mission Viejo Co
Bill Sadler
Construction Manager
(562) 221-9779
[email protected]
E x perience GRIFFIN STRUCTURES 6
The Trust for Public Land (14+) Parks

LOS ANGELES COUNTY, CA
We are currently serving as Project/
Construction Manager for two projects
for The Trust for Public Land (TPL). A
national non-profit organization founded
in 1972, TPL and its Parks for People
Program work with communities to
protect and create close-to-home parks,
particularly in and near cities where 80%
of Americans live. Extensive community
engagement helps identify specific
community recreational needs. Parks
are designed to be ecologically sensitive
and minimize maintenance costs. Parks
include:

Monitor Avenue Park
Bradley Plaza & Green Alleys
Benito Juarez Park
Patton Street Park
Carlton Way Pocket Park
LA River & Aliso Creek Confluence Park
Madison Avenue Park
Rudolph Park
South Victoria Park
Bicentennial Park
Zamora Park
Quincy Jones Park
Central Jefferson High School Park
VALUE
$25,260,000
SIZE
<30 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
The Trust for Public Land
Robin Mark
Program Manager
(310) 770-6499
[email protected]
These projects have been, and are currently managed by, Robert Godfrey and Robert Echavarria.

A W A R D S R E C E I V E D :

Multiple APWA Project of the
Year Recognitions
E x perience GRIFFIN STRUCTURES 7
Rialto Frisbie Park Expansion

RIALTO, CA
This 27.4-acre site is partially developed
with six ball fields, two basketball courts,
a playground area, a pavilion, field
lighting, basketball and volleyball courts,
and asphalt concrete paved drive and
parking areas.

The project included the renovation
of some existing elements such as
an existing restroom; and an 8.5-
acre expansion which feature tennis
courts, t-ball fields, two playgrounds, a
skatepark, new restroom and concession
building, perimeter walking paths, open
turf areas, lighting, shade structures,
improved ADA access and other visitor
amenities.

Griffin’s scope for the $15 million project
included construction management,
inspection, materials testing, and
constructability review services.

This project was managed by Robert
Echavarria with support from Lance
Solomon.

VALUE
$19,000,000
SIZE

27.4 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
City of Rialto
Michael Tahan
Interim Public Works Dir.
(909) 262-4770
[email protected]
A W A R D S R E C E I V E D :

APWA BEST Project Award
E x perience GRIFFIN STRUCTURES 8
Silverlakes Equestrian & Sports Park

NORCO, CA
Griffin served as the construction
manager for Balboa Management Group’s
unique Public-Private Partnership for
the 122-acre Silverlakes Equestrian
and Sports Park with the City of
Norco. The multipurpose recreational
venue is located on 130 acres of Cityowned property along the Santa Ana River. When fully built-out, the $35M
recreational facility will serve as a
regional and national location for field
sports and equestrian competitions.

The first phase of the world-class facility
includes site infrastructure, 24 full-size
soccer fields, four LED-lit synthetic
fields, five competition equestrian
arenas, a 1,500 horse stall capacity, a
horse trail around the project perimeter,
a 10,000-seat concert facility, 12,000 SF
outdoor cafe, and a 4,100-space parking
lot to serve competitors and spectators.

Completion of the second phase will
include a 250-seat restaurant and a
5,000-seat stadium field.

This project was managed by Robert
Echavarria.

VALUE
$35,000,000
SIZE
122 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
Silverlakes Park
Bicky Ross
Chief Operating Officer
(949) 697-8030
[email protected]
E x perience GRIFFIN STRUCTURES 9
Vista Hermosa Sports Park

SAN CLEMENTE, CA
The Vista Hermosa Sports Park and
Aquatics Center features include two
swimming pools and a water play area
along with several ball fields, and a large
children’s play area.

Specific work included sewer, storm
drain, gas, power, potable and recycled
water lines, telephone, grading, curb
and gutter, parking lots, asphalt paving,
roadway widening, aquatics complex with
50-meter competition pool and 25-yard
activity pool with water play feature and
zero-depth entry, pool house, mechanical
building, landscaping and hardscaping,
two soccer fields, and a football / La
Crosse field with synthetic turf.

This project was managed by Lance
Solomon prior to his start with Griffin
Structures.

VALUE
$27,000,000
SIZE
46 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
Sean Nicholas
Former Planner, San Clem.

Senior Planner, Dana Point
(949) 248-3588
[email protected]
E x perience GRIFFIN STRUCTURES 1 0
Santee Town Center Community Park

SANTEE, CA
The sports complex includes three
lighted softball/baseball fields with
artificial turf outfields, two arena soccer
fields, parking and a restaurant with
indoor and outdoor seating. It has also
evolved into the city’s premier concert
venue. Sportsplex USA Santee operates
and maintains the sports complex
through a Public-Private Partnership
agreement.

This project was managed by Robert
Echavarria prior to his start with Griffin
Structures.

VALUE
$24,000,000
SIZE
<20 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
City of Santee
Bill Maertz, Director
(619) 258-4100
Bill Berghoff
(619) 334-1000 x402
A W A R D S R E C E I V E D :

CPRS Sports Park of the Year
APWA Project of the Year
E x perience GRIFFIN STRUCTURES 11
LANLT, Wishing Tree Park

TORRANCE, CA
The LANLT acquired the site through
a donation from Shell Oil. This former
industrial site (Brownfield) requires adept
hazardous materials coordination.

Wishing Tree Park serves over 8,700
residents who live within a half-mile.

Park features include a soft path,
playground, half basketball court, two
sand volleyball courts, two futsal courts,
exercise path, and shaded picnic and
family gathering spaces. Hardscape,
baseball field, and parking lot is also
included.

The project also included a prefabricated
restroom building, baseball field,
playground equipment, 60+ parking
lot, working out equipment, Shade
structures, fire access, road, and ROW
improvements.

This project is currently being managed by
Robert Godfrey and Cody Roth.

VALUE
$10,000,000
SIZE
9 Acres

RELEVANCY
$10M; Active-Use Sports
Park; Public Project

REFERENCE
LA Neighborhood Land Trust
Tori Kjer
Director of Acquisitions
(310) 909-3891
[email protected]
E x perience GRIFFIN STRUCTURES 12
Mackay Park

CYPRESS, CA
Mackay Park features two playground
areas with structures, a large grassy
play area, exercise equipment, a halfcourt basketball court, picnic and shade structures, a restroom building,
perimeter walking paths and a parking
lot. The park also includes a public art
piece donated by the Friends of Cypress
Cultural Arts.

The $2.5 million project is the City’s first
new park in over 20 years. Construction
included earthwork and grading;
concrete, asphalt and masonry work;
protective playground surfacing; as
well as bio-swale/infiltration trenches,
drip irrigation and drought-tolerant
landscaping. Coordination with existing
residents was necessary to provide
fencing for security and pets during
excavation and construction of a new
block wall.

Mackay Park is named for Dan Mackay,
a 28-year Cypress School District Board
member. The park sits on a portion of the
former Mackay Elementary School site.

This project was managed by Robert
Echavarria prior to his start with Griffin
Struct
VALUE
$2,500,000
SIZE
3 Acres

RELEVANCY
Active-Use Sports Park;
Public Project

REFERENCE
City of Cypress
Jeff Draper
Director of Recreation and
Community Services
(714) 229-6785
[email protected]
E x perience GRIFFIN STRUCTURES 13
Lake Forest Sports Park & Recreation Center

LAKE FOREST, CA
Griffin Structures provided construction
management services for the 86-acre
Lake Forest Sports Park and Recreation
Center. The Sports Park features five
baseball fields, six soccer and multi-use
fields of natural turf and synthetic turf, a
rugby field overlay of two soccer fields,
and two basketball courts. The general
use elements consist of two playgrounds
with tot lots and play equipment, two
restroom facilities and eight gazebo
picnic structures. In addition, the Park
has two 1,915 SF clubhouse buildings.

The $52 million project includes a
26,000 SF Recreation Center located
in the middle of the site, situated on a
plateau overlooking the “park commons.”
All rooms are oriented to the distant
views to the south and the west and
have large porches leading out to the
shaded activity areas surrounding the
building. The Center includes recreation
office space, a double gymnasium with a
2-over-1 basketball court configuration,
activity and dance rooms, a teen center,
classrooms, a computer and homework
center, two meeting rooms as well as a
teaching kitchen and restrooms.

This project was managed by Lance
Solomon.

VALUE
$52,000,000
SIZE
86 Acres

RELEVANCY
<$10M; Active-Use Sports
Park; Public Project

REFERENCE
City of Lake Forest
Tom Wheeler
Director of Public Works
(949) 461-3480
[email protected]
A W A R D S R E C E I V E D :

APWA Project of the Year
ASCE Project of the Year
CPRS Excellence Award
E x perience GRIFFIN STRUCTURES 14

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Roger Torriero Principal-In-Charge 43 41
Griffin Structures, Irvine, CA
Master of Architecture, Accademia di Belle Arti di
Firenze, Italia
Bachelor of Architecture, Syracuse University, New York California Contractor License, #793600,
Classes A & B
Affiliations: U.S. Green Building Council, Urban Land Institute, American Public Works Association National Association of Industrial & Office Parks, Associated General Contractors of America, Construction Management Association of America, Design-Build Institute of America, Santa Clara Chamber of Commerce Lexington Park, Cypress, CA
2018 2022
This park is currently in development for the City of Cypress. The property is a trapezoidal shaped parcel with an approximate area of nine acres. Once completed, this 9-acre project will feature both natural and synthetic turf fields, multi-use courts, child and tot play areas, shaded pavilions, exercise stations, picnic shelters, maintenance and storage areas, bleachers, and associated amenities.

Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2020
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

Rialto Frisbie Park Expansion, CA
2019 2020
This $19M, 27.4-acre renovated and expanded park consists of 19 acres of existing improvements and new green space, recreational facilities including three basketball diamonds, three softball diamonds, two basketball courts, playground, pavilion, concessions facilities, park perimeter paths, skate rooms, and supportive facilities. The project was later amended to include planned ADA and path of travel upgrades within the park.

Lake Forest Sports Park & Recreation Center, CA
2011 2015
This $52M, 86-acre Sports Park features five baseball fields, six soccer multi-use fields, rugby field, two soccer fields, two basketball courts, two playgrounds, two restroom facilities, and eight gazebo picnic structures. In addition, the park has two clubhouse buildings and main center, double gymnasium with basketball court, activity and dance rooms, teen center, classrooms, technology center, meeting rooms, teaching kitchen, and restrooms.

The Trust for Public Land (14+) Park Projects, Los Angeles County, CA 2015 Ongoing
Griffin has served on 14 The Trust for Public Land projects, creating close-to-home green spaces and active-use sports parks in cities. Parks, gardens, and trails include; Monitor Avenue Park, Bradley Plaza & Green Alleys, Benito Juarez Park, Patton Street Park, Carlton Way Pocket Park, LA River & Aliso Creek Confluence Park, Madison Avenue Park, Rudolph Park, South Victoria Park, Bicentennial Park,. Zamora Park, Quincy Jones Park, and Central Jefferson Green Alleys.

E x perience GRIFFIN STRUCTURES 15

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jon Hughes, CCM, DBIA Project Executive 29 10
Griffin Structures, Irvine, CA
Bachelor of Science, Philosophy and History, Westmont
College
Certified Construction Manager (CCM)
Design-Build Institute of America (DBIA) Associate
California Contractor License, 793600, Class A
Affiliations: NAVFAC and US Army Corps Construction Quality Management (CQM) Program, Construction Management
Lexington Park, Cypress, CA
2018 2022
This park is currently in development for the City of Cypress. The property is a trapezoidal shaped parcel with an approximate area of nine acres. Once completed, this 9-acre project will feature both natural and synthetic turf fields, multi-use courts, child and tot play areas, shaded pavilions, exercise stations, picnic shelters, maintenance and storage areas, bleachers, and associated amenities.

Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2020
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

Rialto Frisbie Park Expansion, CA
2019 2020
This $19M, 27.4-acre renovated and expanded park consists of 19 acres of existing improvements and new green space, recreational facilities including three basketball diamonds, three softball diamonds, two basketball courts, playground, pavilion, concessions facilities, park perimeter paths, skate rooms, and supportive facilities. The project was later amended to include planned ADA and path of travel upgrades within the park.

Lake Forest Sports Park & Recreation Center, CA
2011 2015
This $52M, 86-acre Sports Park features five baseball fields, six soccer multi-use fields, rugby field, two soccer fields, two basketball courts, two playgrounds, two restroom facilities, and eight gazebo picnic structures. In addition, the park has two clubhouse buildings and main center, double gymnasium with basketball court, activity and dance rooms, teen center, classrooms, technology center, meeting rooms, teaching kitchen, and restrooms.

Newport Beach Marina Park Community & Sailing Center, CA 2013 2015
The project involved new construction of a public park; a 24,000 SF Community and Sailing Center building with classroom, office and meeting space, a 23-slip visitor marina, restroom building, playground lighthouse, playground, outdoor fitness circuit, open space and picnic areas. As a result of the integrated and well-coordinated architectural, engineering and construction efforts, the project was completed four months ahead of schedule and $4 million under budget.

E x perience GRIFFIN STRUCTURES 1 6

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Robert Echavarria Construction Manager 20 7
Griffin Structures, Irvine, CA
Bachelor of Science, Landscape Architecture, California Polytechnic University, Pomona
Certified Construction Manager (CCM)
Affiliations: Sports Turf Managers Association, Synthetic Turf Council Expert Witness for Synthetic Turf, San Jose Silicon Valley Chamber of Commerce
Lexington Park, Cypress, CA
2018 2022
This park is currently in development for the City of Cypress. The property is a trapezoidal shaped parcel with an approximate area of nine acres. Once completed, this 9-acre project will feature both natural and synthetic turf fields, multi-use courts, child and tot play areas, shaded pavilions, exercise stations, picnic shelters, maintenance and storage areas, bleachers, and associated amenities.

Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2020
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

Rialto Frisbie Park Expansion, CA
2019 2020
This $19M, 27.4-acre renovated and expanded park consists of 19 acres of existing improvements and new green space, recreational facilities including three basketball diamonds, three softball diamonds, two basketball courts, playground, pavilion, concessions facilities, park perimeter paths, skate rooms, and supportive facilities. The project was later amended to include planned ADA and path of travel upgrades within the park.

Santee Town Center Community Park, CA
2010 2011
This $24M sports complex includes three lighted softball/baseball fields with artificial turf outfields, two arena soccer fields, parking and a restaurant with indoor and outdoor seating. It has also evolved into the city’s premier concert venue. Sportsplex USA Santee operates and maintains the sports complex through a Public-Private Partnership agreement.

Silverlakes Equestrian & Sports Park, Norco, CA
2012 2014
This $35M, 122-acre sports park features 24 full-size soccer fields, four LED-lit synthetic fields, five competition equestrian arenas, a 1,500 horse stall capacity, a horse trail around the project perimeter, a 10,000-seat concert facility, 12,000 SF outdoor cafe, and a 4,100-space parking lot to serve competitors and spectators. Completion of the second phase included a 250-seat restaurant and a 5,000-seat stadium field.

E x perience GRIFFIN STRUCTURES 17

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lance Solomon, CCM Front-End Document Specialist 26 20
Griffin Structures, Irvine, CA
Certified Construction Manager (CCM) Certified QSP, APWA Inspector Certified, Certified Professional in Erosion & Sediment Control, First Aid & CPR, Confined Space Trained, Concrete Field Testing
Technician, OSHA, CQM Army Corps
Affiliations: Construction Management Association of America, Member Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2022
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

Rialto Frisbie Park Expansion, CA
2019 2020
This $19M, 27.4-acre renovated and expanded park consists of 19 acres of existing improvements and new green space, recreational facilities including three basketball diamonds, three softball diamonds, two basketball courts, playground, pavilion, concessions facilities, park perimeter paths, skate rooms, and supportive facilities. The project was later amended to include planned ADA and path of travel upgrades within the park.

Lake Forest Sports Park & Recreation Center, CA
2011 2015
This $52M, 86-acre Sports Park features five baseball fields, six soccer multi-use fields, rugby field, two soccer fields, two basketball courts, two playgrounds, two restroom facilities, and eight gazebo picnic structures. In addition, the park has two clubhouse buildings and main center, double gymnasium with basketball court, activity and dance rooms, teen center, classrooms, technology center, meeting rooms, teaching kitchen, and restrooms.

Vista Hermosa Sports Park
2010 2012
This $27M, 46-acre sports park features two swimming pools, water play area, several ball fields, and a large children’s play area. The park also houses an aquatics complex with 50-meter competition pool and 25-yard activity pool, pool house, mechanical building, two soccer fields, and football field with synthetic turf.

San Bruno Recreation & Aquatics Center
2021 2023
This $50M new Recreation and Aquatics Center will include outdoor active-use park facilities, natatorium for year-round aquatics, outdoor pool with splash pad, gymnasium, fitness/wellness center, community hall, game room, conference rooms, and several multi-purpose classrooms.

E x perience GRIFFIN STRUCTURES 18

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Cody Roth Code Compliance Specialist 20 4
Griffin Structures, Irvine, CA
Santa Ana College, Fire Science Degree
Rio Hondo College, Fire Academy Graduate
Saddleback College, Various Building Inspector Courses
International Code Council B-1 Building Inspection,
International Code Council E-1 Electrical Inspection,
International Code Council P-1 Plumbing Inspection, CAL OES Safety Assessment Program (ID#77558), CALBO
Former public agency inspector
Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2020
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

LA Neighborhood Land Trust, Wishing Tree Park, Los Angeles, CA 2019 2020
This $10M, 8.5-acre active-use park features a soft path, playground, half basketball court, two sand volleyball courts, two futsal courts, exercise path, and shaded picnic and family gathering spaces. A prefabricated restroom building, baseball field, play equipment and 60-stall parking lot is also included.

Laguna Beach Village Entrance
2018 2020
This 4-acre project consists of the beautification Laguna Beach downtown entry area encompassing. Delivered on-time and below budget by $365,000, this project combines CA landscape design, water quality and control, public art, green space for gatherings, and ample parking. Two pedestrian bridges, one vehicular bridge, wider multi-use trails and paved access roads were also incorporated.

Santa Clarita Canyon Country Community Center
2019 2021
This 27,780 community center and outdoor space includes a new community center with multi-purpose room, gymnasium, classrooms, demonstration kitchen, fitness room, and office. Outdoor improvements also include an outdoor marketplace (mercado) and park features including courts, event stage, playground, events garden, and perimeter trail. The adjacent Mint Canyon Channel was also redeveloped.

The Village at Tustin Legacy, CA
2017 2018
Cody served as an inspector for this high-profile project consisting of 16 buildings, encompassing over 22 acres. His responsibilities included the inspection of underground utilities, storm drain systems, rough/precise grade permits, BMPs, curb and gutter right-of-ways, ADA paths of travel, electrical components, site decorative and retaining walls, foundations and footings, as well as all structural systems.

E x perience GRIFFIN STRUCTURES 19

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Robert Godfrey, CCM Constructability Review Specialist 21 12 Griffin Structures, Irvine, CA
Bachelor of Science, Management, The Georgia
Institute of Technology, Atlanta
Certified Construction Manager (CCM)
Affiliations: Construction Management Association of America, Member The Trust for Public Land (14+) Park Projects, Los Angeles County, CA 2015 Ongoing
We have served on 14 The Trust for Public Land projects who creates close-to-home green spaces and gardens in cities. Parks, gardens, and trails total over $26M and include; Monitor Avenue Park, Bradley Plaza & Green Alleys, Benito Juarez Park, Patton Street Park, Carlton Way Pocket Park, LA River & Aliso Creek Confluence Park, Madison Avenue Park, Rudolph Park, South Victoria Park, Bicentennial Park,. Zamora Park, Quincy Jones Park, and Central Jefferson Green Alleys.

South Gate Urban Orchard, CA
2021 2023
To revitalize adjacent properties to the LA River, Griffin Structures is serving the City of South Gate and The Trust for Public Land to transform 30-acres of post-industrial land located along the LA River into a $24M urban orchard and park. The open space site will house an education garden, orchards, multi-use paths, nature-based playground honoring Tongva history, community buildings, and community-based artwork.

LA Neighborhood Land Trust, Wishing Tree Park, Los Angeles, CA 2019 2020
This $10M, 8.5-acre active-use park features a soft path, playground, half basketball court, two sand volleyball courts, two futsal courts, exercise path, and shaded picnic and family gathering spaces. A prefabricated restroom building, baseball field, play equipment and 60-stall parking lot is also included.

Rancho Cucamonga Sports Center
2016 2018
The new $14M, 56,000 SF Rancho Cucamonga Sports Center features two pre-engineered steel structures–one enclosed and one open-air pavilion, three indoor regulation-sized basketball/volleyball courts as well as concession and public common areas, a multipurpose room, restroom facilities, and administrative office space. The 21,500 SF open-air structure covered an additional three full-size outdoor basketball courts.

Quail Hill Community Center & Outdoor Facilities, Irvine 2016 2018
Griffin served as project/construction manager for this community center set on a 3.8-acre site, including a 3,000 SF multi-purpose room, classrooms, dance/fitness room, warming kitchen, staff offices, and exterior spaces designed to extend the usable space. The site also connects to the existing Quail Hill Trail System and includes ecosystem-themed Rocks & Ropes play area.

E x perience GRIFFIN STRUCTURES 20

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jay Helekar Cost Estimator 22 <10
Griffin Structures, Irvine, CA
Bachelor of Arts, Construction Management
Engineering, California State University, Long Beach
LEED Accredited Professional
Affiliations: U.S. Green Building Council, Member
The Trust for Public Land (14+) Park Projects, Los Angeles County, CA 2015 Ongoing
We have served on 14 The Trust for Public Land projects who creates close-to-home green spaces and gardens in cities. Parks, gardens, and trails total over $26M and include; Monitor Avenue Park, Bradley Plaza & Green Alleys, Benito Juarez Park, Patton Street Park, Carlton Way Pocket Park, LA River & Aliso Creek Confluence Park, Madison Avenue Park, Rudolph Park, South Victoria Park, Bicentennial Park,. Zamora Park, Quincy Jones Park, and Central Jefferson Green Alleys.

Esencia Sports Park, Rancho Mission Viejo Company, Ladera Ranch, CA 2018 2020
The $20M, 30-acre Esencia Sports Park’s lower park site encompasses two baseball fields and one softball field, bullpens, soft toss cages, spectator seating, and batting cages. A multi-use soccer field, children’s tot lot, and concession/restroom building, and pool are also included.

The upper park site houses two tennis courts, two pickleball courts, swimming pool, splash pad, and pool building. This sports park also has associated trails and connections with the adjacent trail network.

Rialto Frisbie Park Expansion, CA
2019 2020
This $19M, 27.4-acre renovated and expanded park consists of 19 acres of existing improvements and new green space, recreational facilities including three basketball diamonds, three softball diamonds, two basketball courts, playground, pavilion, concessions facilities, park perimeter paths, skate rooms, and supportive facilities. The project was later amended to include planned ADA and path of travel upgrades within the park.

Lake Forest Sports Park & Recreation Center, CA
2011 2015
This $52M, 86-acre Sports Park features five baseball fields, six soccer multi-use fields, rugby field, two soccer fields, two basketball courts, two playgrounds, two restroom facilities, and eight gazebo picnic structures. In addition, the park has two clubhouse buildings and main center, double gymnasium with basketball court, activity and dance rooms, teen center, classrooms, technology center, meeting rooms, teaching kitchen, and restrooms.

Newport Beach Marina Park Community & Sailing Center, CA 2013 2015
The project involved new construction of a public park; a 24,000 SF Community and Sailing Center building with classroom, office and meeting space, a 23-slip visitor marina, restroom building, playground lighthouse, playground, outdoor fitness circuit, open space and picnic areas. As a result of the integrated and well-coordinated architectural, engineering and construction efforts, the project was completed four months ahead of schedule and $4 million under budget.

E x perience GRIFFIN STRUCTURES 21

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Aron Taylor Project Manager 21 21
GMU Geotechnical, Inc, Rancho Santa Margarita, CA
Master of Science, Geological Sciences
Bachelor of Science, Geological Sciences
Professional Geologist – State of California
Certified Engineering Geologist – State of California
Qualified SWPPP Developer (QSD) – CASQA Cert
Qualified SWPPP Practitioner (QSP) – CASQA Cert
Affiliations: Building Industry Association (BIA), Geological Society of America, South Coast Geological Society, California Geotechnical
Cypress Sports Park, Cypress, CA N/A 2021
Geotechnical and Special Inspection Services: Grading and construction for (2) Soccer fields, (1) artificial turf and (1) natural, a basketball court, retaining walls, and various hardscape and landscape improvements.

Esencia Sports Park, Rancho Mission Viejo, CA
2017 2019
Geotechnical and Special Inspection Services: Grading and construction for a 30-Acre Sports Park with (2) lighted ball fields, (1) lighted softball field, scoreboard, lighted multi-use turf field, tiered concrete spectator seating, concessions/restroom facilities, (2) lighted tennis courts, (2) lighted pickle-ball courts, swimming pool and splash pad.

Sendero Field, Rancho Mission Viejo, CA
2012 2015
Geotechnical and Special Inspection Service: Grading and construction for new ball fields, including baseball and soccer, (4) pickleball courts, trails, walkways, water quality basin, and a playground.

Crean Lutheran High School South Athletic Fields, Irvine, CA 2013 2015
Geotechnical Services: Grading and construction of new Baseball Field, Softball Field and (6) new tennis courts, batting cages and concrete walkways . Also included in the development of the site was the construction of MSE walls.

Grant Howald Park, Newport Beach, CA
2020 2020
Geotechnical and Special Inspection Service: Grading and construction for new park structures, new pedestrian concrete paving, concrete stairs, decomposed granite walkways, synthetic turf field, masonry retaining walls, cable fencing, tubular steel fencing, ball field fencing, new shade structures, concrete bleachers, and AC parking lot.

E x perience GRIFFIN STRUCTURES 22

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Matthew Farrington Project Manager 20 12
GMU Geotechnical, Inc, Rancho Santa Margarita, CA
Master of Science, Civil Engineering
Bachelor of Science, Civil Engineering
Professional Engineer – State of California
Geo-Wall National and Regional Titles 2014
Cypress Sports Park, Cypress, CA N/A 2021
Geotechnical and Special Inspection Services: Grading and construction for (2) Soccer fields, (1) artificial turf and (1) natural, a basketball court, retaining walls, and various hardscape and landscape improvements.

Esencia Sports Park, Rancho Mission Viejo, CA
2017 2019
Geotechnical and Special Inspection Services: Grading and construction for a 30-Acre Sports Park with (2) lighted ball fields, (1) lighted softball field, scoreboard, lighted multi-use turf field, tiered concrete spectator seating, concessions/restroom facilities, (2) lighted tennis courts, (2) lighted pickle-ball courts, swimming pool and splash pad.

Orange Coast College, Costa Mesa, CA
2018 2020
Geotechnical and Special Inspection Service: Grading and construction of synthetic turf baseball field to replace an existing natural baseball field. Project also included design and construction of new outfield fencing, maintenance gates, and hardscape improvements.

Crean Lutheran High School South Athletic Fields, Irvine, CA 2013 2015
Geotechnical Services: Grading and construction of new Baseball Field, Softball Field and (6) new tennis courts, batting cages and concrete walkways . Also included in the development of the site was the construction of MSE walls.

Grant Howald Park, Newport Beach, CA
2020 2020
Geotechnical and Special Inspection Service: Grading and construction for new park structures, new pedestrian concrete paving, concrete stairs, decomposed granite walkways, synthetic turf field, masonry retaining walls, cable fencing, tubular steel fencing, ball field fencing, new shade structures, concrete bleachers, and AC parking lot.

E x perience GRIFFIN STRUCTURES 23

3. PROJECT UNDERSTANDING & APPROACH
“ G R I F F I N S T R U C T U R E ’ S T E A M W A S

I N S T R U M E N T A L I N S U C C E S S F U L L Y

T A C K L I N G T H E C O M P L E X I T I E S O F

B U I L D I N G M A R I N A P A R K , W H I C H

W A S U L T I M A T E L Y D E L I V E R E D O N
TIME AND UNDER BUDGET.”
- CITY OF NEWPORT BEACH

PRE-BID MANAGEMENT
Design Documents Review
To achieve concise construction documents, Griffin will perform a comprehensive constructability review in
Bluebeam format and review comments with the Design
Team. This effort will seek to identify items that are unclear or in conflict with other aspects of the project, as well as bid ability and best value. This effort will result in a Bluebeam and Excel report which will also include a marked-up set of plans.

Establish Project Controls
Griffin will establish standard protocols for the project team.

We have found that clarity and consistency in direction is the single most significant feature of establishing a successful project protocol. Given our extensive experience in the public sector, we can effectively mold our approach to the Client to effectively become an extension of City staff. With that in mind, we will establish protocols for all aspects of the project.

Specifically including:

Communication channels and policies
Document strategies, specifically how information will be communicated to the field
Key challenges to the project
Established, formalized action items for respective team members
Identified, reinforced key project objectives

PROJECT UNDERSTANDING
Griffin Structures understands the needs of the City of Cypress, and the unique aspects of this park in particular based on our longstanding relationship. This park, the namesake of the City, and one of its oldest parks, is in desperate need of renovation to meet the needs of the community. Griffin Structures understands the critical nature of this project and the high profile it carries throughout the City, calling for the highest level of expertise as it pertains to sports parks. For this reason, we have proposed Construction Manager, Robert Echavarria, who possesses not only significant experience with the City, but is an expert in sports park design and construction supported by a similarly specialized team of public sector active-use sports park PMCMs.

RIALTO FRISBIE PARK EXPANSION
P roject U nderstanding & A pproach GRIFFIN STRUCTURES 24

CONTRACTOR PREQUALIFICATION
Griffin applauds the City for its decision to employ a Contractor prequalification process, as we firmly believe the City will benefit from having a healthy pool of competent bidders which will in turn provide a higher quality construction effort, a more predictable expenditure of project funds, while also continuing to enjoy the benefits of a competitive bidding environment.

Griffin uses as its base template the Department of Industrial Relations Contractor Prequalification Questionnaire in the development of the solicitation request. In addition to the stock language however, Griffin will introduce enhanced language which will further bring value to the City. Specifically, these enhancements will include:
• Contractor financial condition
• Bonding capacity
• Specialized criteria for similar project experience
• Specialized criteria for any critical subcontractors
that the City may want to prequalify
• Critical litigation history
• Project specific references
• Enhance scoring methods and/or disqualification
parameters designed to maximize City flexibility.
• Maintain Public Contract Code compliance to
ensure the process is protest free.

Griffin will then solicit interest in the contractor marketplace by distributing the RFQ to know contractors who have successfully completed similar projects in the past. This effort will also include some project renderings and other components to entice as many respondents as possible. The goal in this phase is to maximize contractor participation to establish the most robust list possible.

Griffin will then utilize its Contractor Prequalification Scoring system to evaluate all responses, score each answer, check on references, evaluate financial capacity, and review litigation history.

Once completed, Griffin will review its scoring with the City and provide documentation to support its recommendations.

Of course, this entire process will be performed in close coordination with the City and will also include any City legal counsel review and dialogue as may be required. Once completed, the City will that have a short list of prequalified bidders who will then have the opportunity to provide a price proposal for the project. In all, our goal is to have this process result in a bid pool of no less than 3 and no more than 7 prequalified bidders as we have found that range to provide the best value for the City.

P roject U nderstanding & A pproach GRIFFIN STRUCTURES 25

BID MANAGEMENT
Once a short list of prequalified contractors is established, Griffin will manage the contractor bidding process. To that end, Griffin will employ the following measure to ensure a fully responsive and responsible bid is delivered to the City.

Distribute Plans
Once bidding is underway, Griffin will work closely with the City and Design Team to coordinate the publishing of the bid documents with the appropriate publications and websites Mandatory Pre-Bid Meeting
Griffin Structures will prepare an agenda and work
closely with the City and Design team to ready all relevant documents for the pre-bid meeting. This will include our agenda, presentation, sign-in sheet, site tour, hard copies of plans, specs, and other relevant materials. Griffin will then publish the minutes, sign-in sheet, and formal responses to any questions in the form of an Addendum.

Bid RFIs
Griffin will serve as the point of contact for all bid questions and will coordinate the distribution of questions and
answers to the relevant parties. Once answers are provided, Griffin will work closely with the Design Team to assemble appropriate Addenda for distribution to plan holders.

Bidder Qualifications
Griffin possesses a deep understanding of parks and what is required of a successful Contractor. We will bring this experience to bear as we evaluate the qualifications of all bidders and offer recommendations to the City.

Issue Addenda
Griffin will take the lead in gathering the necessary
documents and City templates and will coordinate the
distribution of bid Addenda.

Bid Evaluations
Griffin will utilize its tailored Bid Analysis sheet to evaluate the bids on a line-item basis and offer recommendations to the City for award. Any non-responsive bids or nonresponsible bidders will be flagged and forwarded to the City for consideration.

GREAT PARK ICE & FIVEPOINT ARENA
P roject U nderstanding & A pproach GRIFFIN STRUCTURES 26

CONSTRUCTION MANAGEMENT
Once construction begins, Griffin will employ a vast array of policies, protocols, and techniques to oversee and manage the contractor successfully. Those services include the following:

Pre-Construction Meeting
Griffin will arrange for and conduct the Pre-Construction meeting and will provide both and agenda and meeting
minutes accordingly. Griffin will ensure that all pertinent team members will be present in coordination with City staff.

Contract Administration
Griffin will assist the City’s Municipal Projects Manager with all aspects of the contract compliance including all financial controls, document controls, document interpretations,
discrepancies, constructability problems, inspections,
schedule oversight, and all other tasks identified in 3.1 of exhibit B of the RFP.

Review Construction Schedule
As discussed above, Griffin will review any and all schedules provided by the Contractor to confirm they meet the overall objectives of the project. Accordingly, Griffin will oversee and ensure the activities in the field are consistent with the approved schedule and will recommend corrective action
should they fail correlate.

Construction Progress Meetings
Griffin will schedule, host, and oversee all project meetings.

Griffin will provide, or cause to be provided, agendas
and minutes as required for the effective discussion and resolution of all project related issues and resolution.

Shop Drawings & Submittal Reviews
Griffin will oversee the distribution of all shop drawings and submittal reviews. Griffin will employ the use of Submittal Exchange for expedient distribution and tracking as
described above.

Requests for Information (RFIs)
As with shop drawings and submittal reviews, Griffin will process and coordinate the distribution of all RFIs in a manner that achieve efficient design solutions and maintains construction progress without diminishing the design intent.

Review all Change Orders
Griffin will review all change orders and provide
supplemental information as needed to justify their approval or rejection. Griffin will negotiate with the Contractor on the City’s behalf and serve as the point of contact for resolving issues and mitigate against potential claims. Specifically, Griffin will seek to avoid claims as detailed above.

Cost Accounting Records
Griffin has extensive experience in cost accounting methods including but not limited to the management of contract unit costs, T&M analysis, and will employ that experience to provide comprehensive cost accounting records and controls.

Cost Control System
Griffin will use its extensive cost controls system to establish a master budget that captures all costs associate with
the project and will provide regular updates to the City throughout the duration of the project.

P roject U nderstanding & A pproach GRIFFIN STRUCTURES 27 Coordination of Other Consultants
Griffin will coordinate and oversee the scheduling of all other consultant inspections including but not limited to geotechnical, NPDES, materials testing, deputy inspection, and special laboratory testing.

Coordinate with Project Designer
As with the design phase, Griffin will coordinate with
and manage the project design consultants to ensure all information is transmitted to and from the respective
consultants efficiently to achieve the overall objectives of the project.

Job Safety
Crucial to the success of any project is safety. Griffin will employ its extensive experience to oversee the contractor’s safety program and will inspect the site regularly in that regard. Griffin will report any infraction to the contractor immediately and ensure the observed deficiency is rectified.

Progress Payments
Griffin will establish, or cause to be established by the contractor, a comprehensive Schedule of Values for the
entirety of the project for approval by the City. Once
approved this will serve as the basis for all progress
payments, which Griffin will review for consistency with progress in the field and make recommendations to the
Contractor for correction. Once corrected, Griffin will then make recommendations to the City for processing.

Labor Compliance
Consistent with SB 854, Griffin will require and enforce the Dept. of Industrial Relations’ requirements for enrollment in the DIRs labor compliance data base. Griffin will also monitor the results of the DIRs processing of the contractor’s labor compliance and will enforce the proper submission of documents accordingly.

Quality Assurance
Griffin will serve as the ‘eyes and ears’ of the City for quality control. Accordingly, Griffin will walk the site regularly and inspect all installations for consistency with the construction documents. Specifically, Griffin will enforce the highest level of quality of workmanship to ensure the City receives the best value for the investment made on behalf of the community.

Compliance with Funding Requirements
With our extensive experience in managing projects
with multiple funding sources, Griffin will employ a cost accounting process that captures and tracks all required milestones and/or criteria to maintain compliance with
multiple funding sources.

Project Filing System
Griffin will employ a filing system in accordance with Section

16.8 (Chapter 16) of the Caltrans LAPM. In addition to this process, we propose the use of our cloud-based document management system called “Submittal Exchange” and have
included the cost thereof in our reimbursable expenses.

This system is highly customizable, easy to use for both Contractors and Designers alike, and results in a highly detailed comprehensive document management control
vehicle.

P roject U nderstanding & A pproach GRIFFIN STRUCTURES 28

POST-CONSTRUCTION PHASE
Ready for Inspection
Griffin will ensure that the contractor has completed their work in a manner that is satisfactory to meet all necessary conditions for final inspection.

Punch Walk
Griffin will coordinate the final punch walk of the project to ensure all improvements are per the plans and specifications.

Specifically, Griffin will employ a Field Observation Log during the course of construction that will seek to identify quality issues observed by the project team on an ongoing basis. This will serve to function as an ongoing pre-punch list, and therefore help to minimize the issues discovered at the final punch walk. Griffin will also oversee the following punch walks to confirm corrective action is resolved.

Punch List
Once completed, Griffin will issue a comprehensive punch list for completion by the contractor. Griffin will oversee the completion of these items and ensure that all deficiencies and corrections are completed to the satisfaction of the City.

Closeout Documents
Integral to our cloud-based document management
system, Submittal Exchange will assemble all guarantees, certifications, affidavits, leases, easement deed, operating and maintenance manuals, warranties, and any other closeout documents. This system will provide a complete digital file for all documents, for future use, as well as maintain cloudbased file for future use.

Final Payment
Griffin will review all conditions of the project and will ensure that all criteria are met prior to the execution of the Contractor’s final payment.

Final Delivery
Once complete, Griffin will deliver all project files, data, asbuilts, and documentation to the City for record purposes.

CONCLUSION
Griffin Structures prides itself on providing unparalleled construction management service. As described above,
Griffin will serve as the eyes and ears of the City. Our motto is Excellence in Project Delivery. We achieve this through proper management (avoiding issues in the first place) and clear and concise documentation (for defense and resolution of unavoidable issues). Accordingly, Griffin Structures will provide comprehensive construction management services as detailed in the RFP.

ESENCIA SPORTS PARK
P roject U nderstanding & A pproach GRIFFIN STRUCTURES 29

4. APPENDIX
“ G I V E N T H E A T T E N T I O N O U R

P R O J E C T R E C E I V E D , W E N E E D E D

A R E S P O N S I V E , P R O F E S S I O N A L ,

A N D F I S C A L L Y R E S P O N S I B L E

C O N S T R U C T I O N M A N A G E M E N T
P A R T N E R ; G R I F F I N W A S T H E R I G H T
CHOICE FOR US.”
- CITY OF BREA

EXCEPTIONS
We have reviewed the Agreement of Services for the City of Cypress and have included the proposed exceptions and deviations below.

Article 1, line 3, preference to replace “warrants” with “represents”.

General Insurance Requirements, paragraph one, preference to delete terms “amended”, “certified”, and “return receipt”.

Warranty & Representation of Non-Collusion, preference to change both instances of “warrants and represents” to “represents”.

Corporate Authority”, replace the term “warrant” with “represent”.

We respectfully request, and welcome, the opportunity to review and discuss the above comments with the City of Cypress and its legal council.

Thank you.

RIALTO FRISBIE PARK EXPANSION
A ppendi x GRIFFIN STRUCTURES 30

SOUTHERN CALIFORNIA OFFICE
1 TECHNOLOGY DRIVE
BUILDING I SUITE 829
IRVINE, CA 92618
949 497 9000

NORTHERN CALIFORNIA OFFICE
1850 WARBURTON AVENUE
SUITE 120
SANTA CLARA, CA 95050
408 955 0431

LAKE FOREST SPORTS PARK & RECREATION CENTER
CITY OF CYPRESS
CITY COUNCIL REPORT
City Council Regular 12.

FROM: Douglas Dancs, Director of Public Works
DATE: 05/23/2022
SUBJECT: Approve the Purchase of One Replacement Police Vehicle

RECOMMENDATION

1. Authorize the purchase of one replacement police vehicle, including most upfitting, for $61,060 from Wondries Fleet Group via National Auto Fleet Group through the Sourcewell cooperative purchasing program; and

2. Authorize an appropriation increase of $62,326 in the City's Capital Replacement Fund to purchase and fully upfit the replacement police vehicle; and

3. Authorize a transfer of $51,160 from the General Liability Fund to the City's Capital Replacement Fund for available insurance proceeds received.

DISCUSSION
In May 2021, a Police Interceptor SUV was involved in a traffic collision and after several months was considered a total loss by the City’s insurance provider and $51,160 was received as reimbursement for the loss.

Public Works will purchase a replacement vehicle from Wondries Fleet Group via the National Auto Fleet Group through the Sourcewell cooperative purchasing program.

Municipal Code Section 21A-10(e) allows the use of cooperative purchasing programs as a more efficient and cost-effective method of procurement by receiving volume type pricing.

Such cooperative agreements provide the same terms and prices offered to other government agencies through a competitive bid process.

The purchase price and all necessary upfitting for one vehicle is $62,326. None of the specialized equipment on the totaled vehicle was salvageable and cannot be used on the replacement vehicle. While most of the necessary upfitting costs will be incorporated into the purchase from Wondries, the vehicle will require some additional aftermarket installation of specialized equipment. The vehicle should arrive within 160 days of initiating the purchase.

BUDGET IMPACT
The total cost to purchase and upfit the replacement vehicle is $62,326. The City received insurance proceeds of $51,160 and the remaining $11,166 is available in the City's Capital Replacement Fund.

LEGAL REVIEW
None required.

APPROVED BY:  Peter Grant, City Manager
Attachments
Vehicle Cost Estimate With Upfit Bids
Cost Summary

Wondries Fleet Group Cost
Replacement Vehicle $36,534
Paint $1,250
Upfit $18,620
Taxes and Transportation $4,656
Total $61,060
Other Upfitting Cost
Line-X of Orange County Remaining Upfit Cost $516
Full Sail Graphics & Marketing Remaining Upfit Cost $750 Total $1,266
Replacement Cost
Vehicle $42,440
Upfit $19,886
Total $62,326
Insurance Reimbursement
Vehicle $32,440
Upfit $18,720
Total $51,160
Remaining Cost
Vehicle $10,000
Upfit $1,166
TOTAL REPLACEMENT COST TO CITY $11,166
Cost Breakdown Summary
CITY OF CYPRESS
CITY COUNCIL REPORT
City Council Regular 13.

FROM: Douglas Dancs, Director of Public Works
DATE: 05/23/2022
SUBJECT: Approve a Task Order for the Senior Center Interior Improvements Design, Project 290

RECOMMENDATION
Approve a Task Order to BOA Architecture for $31,500 for architectural design services and authorize a contingency of $4,700.

DISCUSSION
The Senior Center was constructed in 1993. It is approximately 15,500 square feet and has gone through several improvements over the years, the latest being the restroom remodel in 2021 and the atrium skylight replacement, roof replacement and heating and air conditioning in 2019.

Public Works worked with Recreation and Community Services to develop the project scope to improve the remaining portions of the facility. The recommended task order provides for design services to address various interior improvements, including new paint, flooring, carpeting, lighting and ceilings throughout the building, removal of unused sinks in various rooms to provide space and usability, staining of all doors, kitchen upgrades, a reconfigured reception desk, and other miscellaneous improvements to provide an updated and modern look.

BOA Architecture is the City's on-call architect and has completed multiple city projects including the recently completed Senior Center and Maintenance Yard restroom improvements. Public Works negotiated the scope of work, fee, and project schedule for a task order to provide design plans and specifications. The plans are expected to be complete by September 2022.

BUDGET IMPACT
The estimated design cost, including contingency, is $36,200 and sufficient project amounts are budgeted in the Recreation and Park District General Fund.

LEGAL REVIEW
None required.

APPROVED BY:  Peter Grant, City Manager
Attachments
Task Order
1511 Cota Avenue
Long Beach, CA 90813
Telephone: 562-912-7900
Telephone: 310-832-2681
www.boaarchitecture.com
May 5, 2022
Alexandru Bangean, P.E.

Project Manager
City of Cypress
Public Works Department
5275 Orange Avenue
Cypress, CA 90630
Subject: Task Order for Architectural Services, Senior Center Interior Improvements, Project 290
Dear Mr. Bangean:

Based on our meeting and site walk-thru, we are pleased to submit our Scope of Work and Fee Proposal for design documents sufficient for building permit and bidding to contractor(s). Our scope is outlined in the attached Scope of Services.

If you should have any questions, please feel free to give me a call at (562)-912-7900.

Sincerely,
BOA Architecture
Edward Lok Ng, Architect, LEED AP
President
Attachment "A" - Scope of Services
Attachment "B" - Schedule of Compensation
Lok Ng
Attachment A
Scope of Services
The Scope of Work for Senior Center Interior Improvements, Project 290, is as follows:

Scope of Work

1. Site visit to confirm interior dimensions, photos, site observation

2. Provide Architectural services for interior improvements and repairs.

3. Secure all relevant City plan check and building permit approvals.

4. Work with City staff to provide itemized cost for each area of work to allow the City to select and prioritize the areas of work.
a. Kitchen:
 Base items: Wall repairs, paint, epoxy floor, chair rails protection, hardware, new lockable cabinet doors for existing under counter open shelves and other miscellaneous items.
 Additive items: kitchen equipment, replace steam table and other miscellaneous items.
b. Multi-Use Rooms:
 Base items: Wall repairs, paint, chair rails protection, ceiling tiles, lighting, repair operable partition wall, hardware and other miscellaneous items.  Additive items: floor, replace two exit doors and other miscellaneous items.
c. Lobby:
 Base items: carpet, new front desk configuration, refinish & stain automatic doors, refinish & stain doors, refinish & stain existing display case and other miscellaneous items.
 Additive items: refinish & stain baseboards and other miscellaneous items. d. General:
 Wall repairs, paint, floors, replace ceiling tiles throughout the facility, lights, re-stain doors and wood trim, replace countertop (Craft Room) and other miscellaneous items.
 Additive items: reface existing cabinets (Admin Office), upgrade gym floor to rubber rolls, remove carpet walls and repair, room conversion and other miscellaneous items.

5. Provide cost estimate

6. Provide PS&E (Plans, Specs, Estimate) for Public Works bidding to contractors

7. Provide submittals for review at 40%, 90%, 100% completion.

Construction Support

1. Pre-bid meeting

2. Provide answers to RFI’s and submittals.

3. Construction Support is limited to amount stated in fee spreadsheet.

Attachment B
Schedule of Compensation
Assumptions Used:

1. Construction Administration is limited to amount of hours indicated.

2. BOA will provide blueprints for Client meeting & submittals to Building & Safety Department

3. The Owner will provide accurate as-built drawings

4. Client will be responsible for procurement of an asbestos/environmental report if required.

5. Client will provide all printing for bidding purposes to Contractors, BOA to provide Construction Documents in PDF
TASK ROLE Hours Rate Cost
PRE-DESIGN Project Manager 8 $150 $ 1,200
Senior Designer 16 $110 $ 1,760

ARCHITECTURAL
SCHEMATIC DESIGN Project Manager 26 $150 $ 3,900
Senior Designer 30 $110 $ 3,300
ENGINEERING and

EXPENSES
Prints, mailing,
misc. $ 240

ARCHITECTURAL

CONSTRUCTION

DOCUMENTS
Project Manager 48 $150 $ 7,200
Senior Designer 110 $110 $ 12,100

CONSTRUCTION
SUPPORT Project Manager 12 $150 $ 1,800
Total $31,500
CITY OF CYPRESS
CITY COUNCIL REPORT
City Council Regular 14.

FROM: Matt Burton, Director of Finance and Administrative Services DATE: 05/23/2022
SUBJECT: Receive and File the Five-Year Technology Master Plan

RECOMMENDATION
Receive and file the Five-Year Technology Master Plan for FY 2022-23 through FY 2026-27.

DISCUSSION
The Technology Master Plan (Plan) provides a technology investment blueprint for the City and Recreation and Park District. The Plan categorizes and prioritizes technology projects for implementation over the next five years. It is updated and presented to the City Council annually in conjunction with the budget.

The Plan for FY 2022-23 through FY 2026-27 remains focused on replacing in-person and paper services with new digital online services, as well as implementing additional accessibility services for the public. Online services have become a commonplace business standard that offer time savings and efficiencies benefiting both the public and City.

Additionally, the Plan continues the City’s practice regarding the timely replacement of technological infrastructure. These infrastructure replacements, along with strong cybersecurity defenses, ensure the City remains protected and operations can continue uninterrupted.

Projects completed, or currently underway, from the Plan approved in conjunction with the FY 2021-22 budget include:

Firewall and Network Security Appliance Replacement
A New Mobile Data Computer for the Maintenance Division Replacement of Police Vehicle Mobile Data Computers
Senior Center Lab Computers Replacement
Website Enhancements
Recommended Plan projects for FY 2022-23 include:

City Facility and Parks Security Survey
City Facility Copier Fleet Replacement
Closed Captioning for City Council Meeting Streams
Data Center Infrastructure Replacement
In-Car Video Replacement for Police Vehicles
Online Public Records Request System
Online Zoning and Land Planning System
Voice over IP Network (VoIP) Phone System
Website Enhancements
BUDGET IMPACT
The FY 2022-23 Proposed Budget incorporates the $906,000 of technology investments included in the first year of the Plan. The Plan funding uses $155,000 of set-asides in the Technology Investment Fund, $151,000 from the City's General Fund, $565,000 of accumulated City and District replacement funds, and $35,000 of restricted Public Education Grant (PEG) monies.

LEGAL REVIEW
None required.

APPROVED BY:  Peter Grant, City Manager
Attachments
Technology Master Plan - FY 2022-23 through FY 2026-27
City of Cypress
Technology Master Plan
For the Five Years of
FY 2022-23 through FY 2026-27

TABLE OF CONTENTS
Introduction ……………...……………………………………………………………….……… 3
Figure 1: Technology Projects Initial Outlay Costs ...……………………………….………. 4 Figure 2: Technology Projects Ongoing Maintenance Costs …………………………….... 5 Figure 3: Technology Projects by Funding Source …………………………………………. 6 Customer Service Projects Detail …………..…………………………………...……………. 7 Organizational Efficiency/Transparency Projects Detail .…..………………...…………….. 8 Technology Infrastructure Projects Detail ……………….…………………..…...………….. 11

INTRODUCTION
Honorable Mayor and Members of the City Council,
We are pleased to present the City’s five-year Technology Master Plan. The Plan provides a blueprint for technology investments; much like the Capital Improvement Program (CIP) does for facilities and infrastructure. It also aims to enable the City to enhance the delivery of core municipal services to our community and to promote organizational effectiveness.

The Technology Master Plan projects are funded through a variety of sources including the City’s Technology Investment Fund, which was established to provide start-up capital for new technology projects. Additionally, there are accumulated replacement funds set aside (largely from the General Fund) and some restricted monies (such as grants) which are available for the replacement of existing technology. The proposed Technology Master Plan calls for investing $155,000 from the Technology Investment Fund, $565,000 from Accumulated Replacement Funds, $151,000 from the General Fund, and $35,000 from Public Education Grant Monies in FY 2022-23.

The technology projects are classified into four categories:
• Customer service projects, which enhance the City’s abilities to serve its customers. • Organizational efficiency/transparency projects, which provide internal process efficiencies and enhance access to records and information through the City’s website. • Technology infrastructure projects, which provide for the replacement of vital existing equipment and invest in future needs.
• Unfunded future projects (if any) are of interest for staff and may be submitted to the City Council for future consideration. These projects may have significant funding requirements and/or legal barriers to consider prior to inclusion as a funded project in the first year of future Technology Master Plans.

Although the pandemic continues to dissipate, and in-person services have resumed, offering additional contactless and online service offerings to the public remains a high priority. These offerings represent a convenience and time savings to the public, as well as efficiencies for staff.

Therefore, the focus of the plan remains on providing high service levels through additional customer service and organizational efficiency projects. We have prioritized projects this year that meet these goals, which include an online public records request system and an online zoning and land planning system. In addition, the city’s phone system will be replaced this year to enhance the reliability and availability of services by phone to the public.

Cybersecurity continues to be an area of focus as attacks on municipalities continue to rise each year. Implementing additional cybersecurity safeguards and maintaining updated technology infrastructure are important to keeping a strong defense from ongoing attacks. Projects to meet this goal are incorporated into this plan. Continued funding to the plan is crucial to ensure resources are available to make continued improvements to the City’s cybersecurity wherever possible. We look forward to the successful implementation of these projects, and appreciate the City Council’s vision and ongoing commitment to the investment in the Technology Master Plan.