All public record to an open session item on this agenda, which are not exempt from disclosure pursuant to the California Public Records Act, that are distributed to a majority of the legislative body will be available for public inspection at the City Clerk’s Office, City Hall located at 333 90 th Street, Daly City, CA during normal business hours, at the same time that the public records are distributed or made available to the legislative body.

CITY OF DALY CITY
Regular Meeting - CITY COUNCIL
AGENDA
Monday, May 9, 2022 - 7:00 PM
COVID-19 ANNOUNCEMENT - PUBLIC MEETINGS

Pursuant to Government Code section 54953(e) et seq., members of the Daly City Council and staff will participate in this meeting via a teleconference. Members of the public are encouraged to watch the meeting via livestream on the City’s YouTube Channel at https://www.youtube.com/DalyCityVideoMeetings, the City’s agenda website at https://www.dalycity.org/agendas or on local Channel 27 (Comcast).

Public Participation:

There are two ways to submit public comment: (1) send written comments by 4:00 pm on meeting day and (2) join to speak at the meeting via Zoom.

To submit a comment in writing, please email [email protected] and write “Public Comment” in the subject line. In the body of the email, include the item number and/or title of the item as well as your comments. All comments received by 4:00 pm will be emailed to the City Council members prior to the meeting. Those comments received after 4:00 pm will be added to the record and shared with the City Council members following the public meeting. Comments are not read aloud into the record.

To speak at the meeting via Zoom, join at https://bit.ly/dalycitymay9zoom. Zoom will require an email address and name. The name entered will be visible online and will be used to notify you that it is your turn to speak.

You may also join by visiting https://zoom.us/join. Enter meeting ID: 813 7988 5615, then enter email address and name. The May 9, 2022 Regular City Council meeting may also be accessed via telephone by dialing +1 669 900 6833 (Local). Enter the meeting ID: 813 7988 5615, then press #.

When you would like to speak on an item during the public comment portion of the meeting, you will need to use the “raise hand” feature in Zoom. Public comment is limited to two (2) minutes maximum, and speakers may only comment once per item. You must familiarize yourself with Zoom prior to joining the meeting. The City will not be providing technical support.

If you do not wish to speak, the City requests that you watch the livestream of the meeting on the City’s YouTube Channel at https://www.youtube.com/DalyCityVideoMeetings, the City’s agenda website at https://www.dalycity.org/agendas or on local Channel 27 (Comcast).

Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting should call the office of the City Clerk at 991-8078 as soon as possible.

Page 1 of 189 ends

Agenda – City Council
Monday, May 9, 2022

Page 2 ends

CALL TO ORDER:

PLEDGE TO THE FLAG:

ROLL CALL:

PRESENTATIONS:

1. Proclaiming May 2022 as Wildfire Preparedness Month, Battalion Chief Matt Powers, North County Fire Authority

2. Proclaiming Week of May 15-21, 2022 as Emergency Medical Services Week, Battalion Chief Matt Powers, North County Fire Authority

3. Proclaiming May 2022 as Asian American and Pacific Islanders Heritage Month, Joseph Bautista, Legacy Filipino Martial Arts

4. Proclaiming Week of May 15-21, 2022 as National Public Works Week, Richard Chiu, Director of Public Works

APPROVAL OF MINUTES:

5. Regular Meeting of April 25, 2022

APPROVAL OF AGENDA:

CONSENT AGENDA
All items listed on the Consent Agenda are considered to be routine and may be approved by one roll call vote of the City Council. There shall be no separate discussion of the matters on the Consent Agenda unless requested by a member of the City Council. If discussion is required, that item will be removed from the Consent Agenda and will be considered separately at the end of the Agenda.

Resolutions:

6. Authorizing City Manager to Execute a Professional Services Agreement for Design Services of the 2022-23 Street Resurfacing Project

7. Setting the Time and Place of the Public Hearing for Daly City’s National Pollutant Discharge Elimination System Program Regulatory Fee Set Hearing: 6/13/2022

8. Approving FY 2022-23 Project List for Road Maintenance and Rehabilitation Account Funds Authorized Under SB 1

Page 2 of 189 ends

Agenda – City Council
Monday, May 9, 2022

Page 3 ends

9. Approving the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue

10. Authorizing City Manager to Execute a Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project

11. Accepting and Appropriating a Grant from the State of California for a Book to Action program, Mutual Rescue

12. Authorizing the City to Implement Teleconferenced Public Meetings Pursuant to Assembly Bill 361

Check Registers:

13. Check Registers for the Month of March 2022

END OF CONSENT AGENDA

PUBLIC HEARINGS:

14. Introduction of Ordinance for Military Equipment Policy (AB481) STAFF: Cameron Christensen

RECOMMENDATION: Open/Close Hearing
Motion for City Attorney to Read by Title Only
Councilmember Introduce Ordinance

PUBLIC APPEARANCES/ORAL COMMUNICATIONS:

NOTE: Speakers are limited to two minutes, unless modified by the Mayor. The Council cannot take action on any matter raised under this item.

APPOINTMENTS: Board/Commission Membership Committee Appointments

REPORTS:

15. Council Committee

16. City Council

17. Staff

ADJOURNMENT:

Page 3 of 189 ends

Proclamation

WILDFIRE PREPAREDNESS MONTH
MAY 2022
WHEREAS, Last year California experienced eight thousand eight hundred thirty-five wildfires burning two and half million acres in the state; and WHEREAS,three thousand six hundred twenty-nine structures were damaged or destroyed by wildfires last year in California; and
WHEREAS, each year, more people move into wildland urban interface areas increasing the need to raise awareness to our citizens on how they can protect their property from wildfire losses; and
WHEREAS, Zonehaven has been adopted as a county wide tool to assist with informed evacuations during wildfire and we encourage “know your zone” before an emergency arises; and
WHEREAS,the North County Fire Authority encourages fire-safe behavior by all who live, work, and recreate throughout the City of Daly City; and WHEREAS,each of us can do our part to prepare for wildfire emergencies by taking steps to make effective changes to our homes and landscapes to reduce the risk of wildfire; and
WHEREAS,if we work together collaboratively and with awareness, we can remain strong and resilient.

NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor and members of the City Council of Daly City hereby proclaim May 2022 as “WILDFIRE PREPAREDNESS MONTH” and encourage all Daly City residents to increase their knowledge and awareness of proper safety measures to protect themselves from the devastating effects of wildfires.

Signed and sealed by the Mayor and City Council of the City of Daly City this 9th day of May 2022.

Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember

Page 4 of 189 ends

Proclamation
Emergency Medical Services Week, May 15-21, 2022
WHEREAS, emergency medical services pre-hospital is a vital public service; and WHEREAS, the North County Fire Authority is ready to provide lifesaving pre-hospital care to those in need 24 hours a day, seven days a week; and
WHEREAS, access to quality emergency pre-hospital care dramatically improves the survival and recovery rate of those who experience sudden illness or injury; and WHEREAS, emergency medical services and pre-hospital care has grown to fill a gap by providing important, out of hospital care; and
WHEREAS, the emergency medical services pre-hospital care system consists of first responders, emergency medical technicians, firefighter paramedics, private paramedics emergency medical dispatchers, firefighters, police officers, educators, administrators, pre-hospital nurses, emergency nurses, emergency physicians, trained members of the public, and other out of hospital medical care providers; and
WHEREAS, the North County Fire Authority engages in thousands of hours of specialized training and continuing education to enhance their lifesaving skills; and WHEREAS, this last year Emergency Medical Services continues to face with unprecedented health and safety challenges due to the COVID-19 pandemic, which resulted in monumental changes in everyday procedures; and
WHEREAS,it is appropriate to recognize the value and the accomplishments of the North County Fire Authority and emergency medical services providers by designating Emergency Medical Services Week.

NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and members of the City Council do hereby proclaim the week of May 15-21, 2022, as EMERGENCY MEDICAL SERVICES WEEK in Daly City with the EMS Strong theme, EMS Rising to the Challenge and encourage the community to observe and honor those who respond to medical emergencies in our communities.

Signed and sealed by the Mayor and City Council of the City of Daly City this 9th day of May 2022.

Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember

Page 5 of 189 ends

Proclamation
Asian American and Pacific Islanders Heritage Month
May 2022
WHEREAS,Asian American and Pacific Islander Heritage Month is a month to celebrate and pay tribute to the contributions of Asian Americans and Pacific Americans to American history, society, and culture; and WHEREAS,Asian American and Pacific Islander Heritage Month originated in a congressional bill in June of 1977. On March 28, 1979, President Carter issued Presidential Proclamation 4650, proclaiming the week beginning on May 4, 1979, as Asian/Pacific American Heritage Week; and WHEREAS,On May 1, 2009, President Obama issued Presidential Proclamation 8369 proclaiming May 2009 as Asian American and Pacific Islander Heritage Month; and
WHEREAS,Asian Americans and Pacific Islanders comprise many ethnicities and languages, and their many achievements embody the American experience; and
WHEREAS,Asian Americans and Pacific Islanders are leaders in all aspects of American life: government and industry, science and medicine, the arts and Armed Forces, education, and sports; and
WHEREAS,AAPI’s are one the fastest growing ethnic populations in the nation with more than 20 million Asian Americans and Pacific Islanders in the United States—approximately 59,716 Asian Americans and Pacific Islanders in the City of Daly City which accounts for 58.2% of the population in the city.

WHEREAS,the Daly City community has benefitted through the cultural richness, diversity, and generosity of its local Asian Americans and Pacific Islanders with its vast diversity of languages, religions, and cultural traditions that continue to strengthen the fabric of American society.

NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and members of the City Council of the City of Daly City, do hereby proclaim May 2022 as “Asian American and Pacific Islanders Heritage Month” in Daly City to celebrate and pay tribute to the contributions of Asian Americans and Pacific Islanders to American history, society, and culture.

Signed and sealed by the Mayor and City Council
of the City of Daly City this 9th day of May 2022.

Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember

Page 6 of 189 ends

Proclamation
National Public Works Week, May 15 -21, 2022
WHEREAS,May 15 – 21, 2022 is celebrated as National Public Works Week; and WHEREAS, National Public Works Week is a celebration of the dedicated public works professionals who provide and maintain the infrastructure and services collectively known as public works with the 2022 theme of “Ready and Resilient”; and
WHEREAS,Public Works professionals focus on infrastructure, facilities and services that are of vital importance to sustainable and resilient communities and to the public health, high quality of life and well-being of the people of the City of Daly City; and
WHEREAS,these infrastructure, facilities and services could not be provided without the dedicated efforts of public works professionals, who are engineers, managers, and employees at all levels, who are responsible for rebuilding, improving, and protecting our nation’s transportation, water, wastewater and stormwater treatment, public buildings, parks, and other structures and facilities essential for our citizens; and
WHEREAS, it is in the public interest for the citizens, civic leaders and children in the City of Daly City to gain knowledge of and to maintain an ongoing interest and understanding of the importance of public works and public works programs in their respective communities; and
WHEREAS, the health, safety and comfort of this community greatly depends on the efforts and skills of dedicated public works employees; and WHEREAS, so long as the design, construction, operation and maintenance of these facilities works smoothly the people behind the scene are often forgotten.

NOW THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and Members of the City Council of the City of Daly City, do hereby proclaim May 15 – 21, 2022 as NATIONAL PUBLIC WORKS WEEK, in the City of Daly City, and call upon all residents and civic organizations in the community to pay tribute to our public works professionals, and to recognize the substantial contributions they make to protecting our health, safety, and quality of life.

Signed and sealed by the Mayor and City Council
of the City of Daly City, this 9th day of May 2022.

Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember

Page 7 of 189 ends

CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
--------------------------------
Note on Public Comments: For this meeting, members of the public were encouraged to watch the meeting via livestream and speak at the meeting via Zoom, and/or submit public comments via email to the City Clerk’s Office prior to the public meeting. Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting were instructed to call the office of the City Clerk at 991-8078 prior to the meeting.

Visit https://www.youtube.com/c/DalyCityVideoMeetings to view videos of the City Council meetings

The meeting was called to order by Mayor Daus -Magbual at 7:00 P.M. by video conference call pursuant to Governor Gavin Newsom’s Executive Order N-29-20.

ROLL CALL: Councilmembers Present:

Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni
Juslyn C. Manalo
Glenn R. Sylvester

Staff Present:

Shawnna Maltbie, City Manager
Rose L. Zimmerman, City Attorney
K. Annette Hipona, City Clerk

PRESENTATIONS:

Proclaiming April 2022 as National Poetry Month, Daly City Youth Poet Laureate Representative (Victoria Magbilang, Daly City Public Library Associates)

Poetry Reading by Daly City Youth Laureate
(Jescent Marcelino)

Proclaiming May 1, 2022 as Global Love Day
(John Goltz, Vice President, The Love Foundation)

Proclaiming May 2022 as Mental Health Month
(Stephanie Garma Balon and Christi Morales-Kumasawa, Co-Chairs, Filipino Mental Health Initiative, San Mateo County)

APPROVAL OF MINUTES:

Regular Meeting of April 11, 2022

It was moved by Councilmember Sylvester, seconded by Councilmember DiGiovanni and carried to approve the minutes of April 11, 2022.

APPROVAL OF AGENDA:

It was moved by Councilmember Manalo, seconded by Councilmember DiGiovanni and carried to approve the agenda.

Page 8 of 189 ends

CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
2 CONSENT AGENDA:

It was moved by Councilmember Manalo, seconded by Councilmember Buenaventura and carried to approve the consent agenda with the exception of items #6 and #10 which were pulled for further discussion.

Resolutions:

Authorizing City Manager to Execute a Professional Services Agreement for the Vision Zero Community Outreach Project

Director of Public Works Richard Chiu provided background on the program grant in the amount of $50,000 with a 50% local match. The project will do outreach and education of roadway users and will work towards a goal of zero serious injuries and fatalities by year 2035.

It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by voice vote to adopt the following resolution:

Resolution 22-56, Authorizing Execution Of A Professional Services Agreement For The Vision Zero Community Outreach Project

Amending Traffic Regulations to: (1) Install a 15 ft. No Parking (red) zone at the southwest corner of South Hill Boulevard and Bellevue Avenue (TSR 22/33); and (2) Install 57 ft. No Parking (red) zones at the northeast and northwest corners of the drivewa y on Southgate Avenue to Fernando Rivera Intermediate and Thomas Edison Elementary Schools (TSR 22/36)

Resolution 22-57, Establishing Traffic Regulations

Authorizing City Manager to Execute an Amendment to the Professional Services Agreement for the Mussel Rock 2019 Gabion Wall and Stormwater Maintenance Project

Resolution 22-58, Authorizing Amendment #1 Of Professional Services Agreement With 4L eaf, Inc., For Additional Construction Management And Support Services For The Mussel Rock 2019 Gabion Wall And Stormwater Maintenance Project

Authorizing Amendment to the Professional Services Agreement with Tetra Tech, Inc. for Mussel Rock Waste Boundary Investigation for the Mussel Rock Upper Disposal Area

Resolution 22-59, Authorizing Amendment Of Professional Services Agreement With Tetra Tech, Inc. Mussel Rock Waste Boundary Investigation For Mussel Rock Upper Disposal Area

Approving Reclassification of Network Administrator II to Financial Services Manager

Director of Finance and Administrative Services Tim Nevin recommended the reclassification to better align staffing with the identified needs within the Finance Department. Budgeting for the reclassified position will come from the General Fund and will result in an increase of $28,702 to that fund. Mr. Nevin addressed questions on when the reclassified position was last filled, the cost savings from part-time consultant who will be ending their tenure in next fiscal year, and the job responsibilities of the Financial Services Manager.

Page 9 of 189 ends

CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
3 It was moved by Councilmember DiGiovanni, seconded by Councilmember Sylvester and carried by voice vote to adopt the following resolution:

Resolution 22-60, Approving Reclassification Of Network Administrator II To Financial Services Manager In Range U086 Of The Miscellaneous Unrepresented Salary Schedule

Approving the Recovered Organic Waste Product and Recycled-Content Paper Procurement Policy

Resolution 22- 61, Approving The Updated Recovered Organic Waste Product And Recycled- Content Paper Procurement Policy

END OF CONSENT AGENDA

PUBLIC HEARINGS:

HOME Investment Partnerships-American Rescue Plan (HOME-ARP) Allocation Plan

Housing and Community Development Supervisor Betsy ZoBell provided information on the HOME-ARP funds, a special, one-time allocation targeted to reduce homelessness and increase housing stability across the country. The City received a one- time allocation of $1,411,179 in HOME -ARP funds and must develop a plan approved by HUD. Based on analysis and outreach, staff has drafted a plan which envisions use of $1,199,503 in funds to support the development of affordable housing , specifically for extremely low-income households. Ms. ZoBell addressed questions on whether any funding will go towards housing for veterans and which households are targeted by the funding.

It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried to open the public hearing. There were no speakers on this matter.

It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following resolution:

Resolution 22-62, Approving The HOME-ARP Allocation Plan

City’s HUD Consolidated One-Year Action Plan for Fiscal Year 2022-23

Senior Management Analyst Lenelle Suliguin provided background on HUD’s requirements to receive Federal funds and discussed the public participation and outreach conducted by staff regarding these funds. Ms. Suliguin reported on the March 10 th CDBG Advisory Committee and presented the recommended funding allocations of the CDBG (approx. $1.3 million) and HOME funds (approx. $389k); these recommendations represent an opportunity to help lower income Daly City families and individuals.

Ms. ZoBell and Ms. Suliguin addressed questions on the Rehabilitation Program, Rehabilit ation loan payments and allocation amounts for Public Service Programs.

It was moved by Councilmember DiGiovanni, seconded by Councilmember Sylvester and carried to open the public hearing. There were no speakers on this matter.

It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following resolution:

Page 10 of 189 ends

CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
4 Resolution 22- 63, Approving The City’s One -Year Action Plan For Fiscal Year 2022 -2023 (July 1, 2022 Through June 30, 2023)

ORDINANCES:

Second Reading, Ordinance No. 1457, Amending Title 17 of the Daly City Municipal Code, Re:

Locational Standards for Smoke Shops

City Attorney Rose Zimmerman provided the second reading of the subject ordinance and clarified the ordinance was publicly noticed in the newspaper prior to the first and second readings.

It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following ordinance:

Ayes: Buenaventura, Daus-Magbual, Manalo
Noes: DiGiovanni, Sylvester

Ordinance 1457, Amending Title 17 of Daly City Municipal Code Re: Locational Standards for Smoke Shops and Tobacco Stores

PUBLIC APPEARANCES:

Call-in User1, the Public, referred to the proclamation on mental health, requesting a reduction in law enforcement by 10% . The public requested de -escalation in law enforcement, acknowledged Officer Dante, requested more mental health facilities and social workers, and reported on the increase in BART’s mental health clinicians.

Call-in User2, Jim Lawrence, Chair of San Mateo County Fixin’ , supported enacting a Civilian Oversight Board & Inspector General’s Office for San Mateo County Sheriff’s Office. Fixin’ urged the Board of Supervisors to install the Oversight Board for public transparency into the county governmental office, to gain community trust, to ensure fair treatment, to have good governance and accountability for the people’s tax dollars.

Michelle questioned the need to have public funding for housing and stated it is in the best interest of citizens to have a private property ownership solution.

REPORTS:

Council Committee

Peninsula Clean Energy (PCE) (Daus-Magbual)

City Council

Councilmember Manalo commended Jefferson Elementary School District for their All-Electric Leader Award from PCE. Councilmember Manalo joined the Community Passover Seder in San Francisco to observe the annual communal holiday. Councilmember Manalo thanked the Mayor for ensuring the City had the Ukrainian flag-raising at City Hall to display its anti-war sentiments.

Page 11 of 189 ends

CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
5 Councilmember Manalo volunteered with the DC Host Lions Club at the Spring Fun Day Event and commended Recreation staff and Recreation Services Manager Denise Brown for all their work; Councilmember Manalo also acknowledged her family, County Supervisor David Canepa and family, and the various small businesses and vendors who were in attendance at the event. Councilmember Manalo commended the return of senior programs at Doelger Café and commended older adults who are staying active through these programs.

Councilmember DiGiovanni acknowledged State Assembly Pro Tem Kevin Mullin and Phil Ting for having a resolution to recognize the 107th-year remembrance of the Armenian genocide and acknowledged Congresswoman Jackie Speier’s family members who perished in the genocide.

Councilmember DiGiovanni commended Recreation staff on their work for Spring Fun Day; Councilmember DiGiovanni acknowledged the Explorers, the Police Department staff, Westlake Students, volunteers and youth who were in attendance. Councilmember DiGiovanni reported on programs returning for seniors at Doelger Senior Center and commended Active Adult/Senior Services Supervisor Cooney, Recreation Services Manager Brown and City Manager Maltbie.

Mayor Daus-Magbual congratulated Jefferson Elementary School District on receiving the 2022 All-Electric Leader Award for Outstanding Commercial Project, the first workforce campus for grades K-8 in California. Mayor Daus-Magbual invited all to attend the Youth Poet Laureate Commencement at City Hall on Thursday, April 28, which will feature performances from the youth finalists and resident Poet Laureate Aileen Cassinetto. Mayor Daus-Magbual provided a reminder for Love Daly City Event on April 30 and the upcoming Annual Earth Day recycling events on May 7; both will be held at City Hall.

Mayor Daus-Magbual acknowledged Project Green Space’s upcoming event to plant trees in the Bayshore neighborhood and commended Assistant to the City Manager Leilani Ramos for CLEAN Daly City; the Mayor announced various opportunities for clean-up in Daly City neighborhoods and parks.

ADJOURNMENT:

Mayor Daus-Magbual adjourned the meeting at 9:15 PM in memory of Michael Burton, Barbara Reagan Davis, Brandon Cheese, and Isaako Poti, Sr.

Approved as submitted, this 9th
City Clerk
day of May , 2022.

Mayor

Page 12 of 189 ends

City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Authorize the City Manager to Execute a Professional Services Agreement for Design Services of the 2022-23 Street Resurfacing Project Recommended Action
Staff recommends that the City Council authorize the City Manager to execute an agreement and any necessary amendments, in an amount not to exceed $300,000.00, for professional services with NCE of Point Richmond, California, to provide engineering design services for the 2022-23 Street Resurfacing Project.

Background
The street resurfacing project complements the City’s annual street slurry seal program to help Daly City maintain its pavement condition index (PCI). Whereas the annual slurry seal program cost-effectively extends the useful life of streets in fair and good conditions, the resurfacing projects perform more extensive pavement rehabilitation work to restore streets that are in poor condition.

The 2022-23 Street Resurfacing project includes pavement rehabilitation for streets located in the Hillside, Bayshore, Skyline, St. Francis, and Serramonte neighborhoods. The streets to be rehabilitated were selected through a comprehensive evaluation of the City’s Pavement Management Program, recommendations from the Street Maintenance Division, coordination with other planned City projects, and availability of funds.

The rehabilitation work will include base failure repair, asphalt concrete (AC) overlay, and other reconstruction treatment options as determined by the consultant during design. ADA curb ramps within the limits of work will be evaluated and if found to be deficient, will be reconstructed to meet current federal ADA requirements. Approximately 2.2 centerline miles of roadway will be restored with the project as shown on the attached location map.

Discussion
Staff released a Request for Proposals (RFP) for pavement engineering services on March 8, 2022, to eighteen firms from the City’s 2021 General Engineering Services short list with expertise in pavement design. Proposals were received from three firms and a panel consisting of staff from the Public Works department evaluated the proposals on their technical merits. The panel determined NCE has the experience and qualifications that meet the needs of the project.

The scope of work under this professional services agreement includes the following:

1. Coordinate with utility agencies to avoid potential construction delays and unnecessary disruptions to public services;

Page 13 of 189 ends

Authorize the City Manager to Execute a Professional
Services Agreement for Design Services of the 2022-23
Street Resurfacing Project
Meeting Date: May 9, 2022

Page 2 of 2 ends

2. Perform pavement condition surveys of each street section based on distresses concurrent with field testing;

3. Collect core samples of street pavement sections;

4. Perform pavement analysis and design services, and develop pavement rehabilitation treatment recommendations;

5. Prepare design plans, specifications, and cost estimates (PS&E) for construction;

6. Provide bid and construction support services; and

7. Survey and design ADA curb ramps.

Fiscal Impact
The professional services agreement with NCE provides for a not-to-exceed amount of $271,200 for the design of the 2022-23 Street Resurfacing project. An additional $28,800 (10%) is needed for design contingency for a total cost of $300,000.

Sufficient Funds are available in the FY 2021-22 Transportation Fund Project Accounts 17-312- 918 (2021-22 Street Resurfacing) and 17-312-919 (2022-23 Street Resurfacing) to fully fund this professional services contract.

Summary/Conclusion
Staff recommends that the City Council authorize the City Manager to execute an agreement and any necessary amendments, in an amount not to exceed $300,000.00, for professional services with NCE of Point Richmond, California, to provide engineering design services for the 2022-23 Street Resurfacing Project.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Roland Yip Richard Chiu, Jr.

Senior Civil Engineer Director of Public Works
Attachments: Project Location Map
NCE Professional Services Agreement

Page 14 of 189 ends

2022-23 STREET RESURFACINGPROJECT LOCATION MAPSAN MATEO COUNTY, CALIFORNIACITY OF DALY CITY 10000500FEET

Page 15 of 189 ends

-1-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc

AGREEMENT WITH NCE

FOR DESIGN PROFESSIONAL SERVICES
FOR
City of Daly City

This Agreement, made and entered into this ____ day of __________, 2022 (the “Effective Date”) by and between the CITY OF DALY CITY, a municipal corporation existi ng under the laws of th e State of California (”CITY"), and NCE, a California S-Corporation ("CONSULTANT"):

NCE
501 Canal Blvd, Suite I
Point Richmond, CA 94804

R E C I T A L S :

A. CITY desires certain construction document services hereinafter described as t he design services for the 2022-23 Street Resurfacing Project.

B. CITY desires to engage CONSULTANT to provide these consulting services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.

NOW, THEREFORE, IT IS AGREED as follows:

SECTION 1 - SCOPE OF SERVICES

The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreeme nt, the proposal from NCE dated April 18 th, 2022, attached and
incorporated by reference.

SECTION 2 - DUTIES OF CONSULTANT

CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnis hed by CONSULTANT un der this Agreement. CONS ULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.

CONSULTANT represents that it is qualified to furnish the services described under this Agreement.

CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.

Page 16 of 189 ends

-2-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 3 - DUTIES OF CITY

CITY shall provide pertinent information regarding its requirements for the project.

CITY shall examine documen ts submitted by CONS ULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT'S work.

SECTION 4 - TERM

The services to be performed under this Agreement shall commence on the Effective Date and be completed within two (2) years.

SECTION 5 - PAYMENT

Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A , CITY agrees to pay CONSULTANT , on a time and materials basis, pursuant to rates stated in Exhibit A to this Agreement, attached and incorporated by reference . In no event shall CONSULTANT ’s total compensatio n under this Agreement exceed two hundred seventy one thousand two hundred dollars ($271,200).

SECTION 6 – TERMINATION

Without limitation to s uch rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.

Upon termination and upon CITY'S payment of the amount require d to be paid, document s become the property of CITY, and CONSULTANT shall transfer them to C ITY upon request without additional compensation.

SECTION 7 - OWNERSHIP OF DOCUMENTS

All documents pre pared by CONSULTANT in the perf ormance of this Agreement , al though instruments of professional service, are and shall be the property of CITY, whether t he project for which they are made is executed or not.

SECTION 8 - INDEPENDENT CONTRACTOR

It is unders tood that Consultant, in the pe rformance of the work and ser vices agreed to be performed, shall act as and be an independent contractor and shall not ac t as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or othe r benefits which ac crue to City 's empl oyees, and Consultant hereby expressly waive s any claim it may have to any such rights.

Page 17 of 189 ends

-3-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc

SECTION 9 - CONFIDENTIALITY

All reports and documents prepared by CONSULTAN T in connection with the performance of this Agreement are confidential until releas ed by CITY to the public. CO NSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.

SECTION 10 - INTEREST OF CONSULTANT

CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.

SECTION 11 – USE OF SUBCONSULTANTS

CONSULTANT shall not s ubcontract any services to be performed by it under this Agreement without the prior written approval of the CITY, except for service firms engaged in drawing, reproduction, typing, and printi ng. CONSULT ANT shall be solely responsible for reimbursing any subconsultants and the CITY shall have no obligation to them.

SECTION 12 - CONSULTANT'S STATUS

It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent CONSULTANT as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.

SECTION 13 – SB 1383 COMPLIANCE

To the extent applicable, CONSULTANT shall comply with the requirements set forth in SB 1383 and Public Contracts Code Section 22150 for the procurement of recycled paper products.

To the extent that the fitness and quality are equal, CONSULTANT shall purchase recycled products, as defined in Public Contracts Code Section 12200 instead of nonrecycled products.

Upon completion of the term of this Contract, CONSULTANT shall provide records to the CITY demonstrating compliance with this section, including copies of all invoices, receipts, or other proofs of purchase that detail the procurement of paper products.

SECTION 14 - INDEMNITY

To the fullest extent per mitted by law (including, without limitation, Califor nia Civil Code Sections 2782 and 2782.6), Consul tant and Consultant’s sureties agree to reimburse the apportioned costs to defend (with legal counsel acceptable to the City), indemnify and hold harmless the Ci ty, its officers, agents, off icials, representatives , employees and volunteers

Page 18 of 189 ends

-4-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
(collectively “Indemnitees”) from and ag ainst any and all claims, demands, actions, losses, pure economic damages, injuries, and liability, direct or indirect (including , court costs, a ttorneys’ fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation), to the extent caused by the gross negligence, recklessness, or willful miscon duct of Consultant, any Subconsultant, anyone directly or indirectly employed by them, or anyone that they control (collectively “Liabilities”). Such obligations to defend, hold harmless and indemnify a ny Indemnitee shall not apply to the extent that such Liabilities are arise out of the sole negligence, active negligence, or willful misconduct of Indemnitee.

Acceptance by the City of the work performed under this Agreeme nt does not operate as a release of Consultant from such professional responsibili ty for the work performed pursuant to this Agreement.

The duty of Consultant and its sureties to indemnify and hold harmless as set forth above, shall include the duty to defend as set forth in Section 2778 of the California Civil Code, provided, however, that nothing herein s hall be construed to require the Consultant to indemnify the City, its subsidiary districts, its officers, agents or employees against any responsibili ty for liability in contravention of Section 2782 of the California Civil Code.

Consultant and its sureti es expressl y and specifically agree to waive any and all subrogation rights it may have against the City, its subsidiary districts, offic ers or employees.

Indemnification and waiver of subrogation contained in this section shall remain operative and in full force and effect regardless of any termination of this Agreement.

SECTION 15 - INSURANCE

CONSULTANT shall procure and maintain for t he dura tion of the contract a nd three years thereafter (five years for building or major improvements) insurance again st claims fo r injuries to persons or damages to prope rty which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONSULTANT , his agents, representatives, employees or subcontractors.

MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, inclu ding products -completed operations, personal & adver tising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/lo cation or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: ISO Form Number CA 00 01 covering a ny auto (Code 1), or if CONSULTANT has no owned autos, hired, (Code 8) and non -owned autos ( Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.

Page 19 of 189 ends

-5-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc

3. Workers’ Compensation: as required by the State of California, with S tatutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.

4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be e ntitled to coverage for the higher li mits maintained by the CONSULTANT.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The City, its elected and appointed officials, employees, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONSULTANT including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.

Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.

Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of an y right to subrogation whi ch any insurer of said CONSULTANT may acquire against the City by virtue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and

Page 20 of 189 ends

-6-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
defense expenses within the retention.

Acceptability of Insurers

Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Claims Made Policies (note – should be applicable only to professional liability, see below) If any of the required policies provide claims-made coverage:

1. The Retroactive Date mu st be shown, and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided fo r at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims -made policy form with a Retroa ctive D ate prior to the contr act Effective Date, the CONSULTANT must purchase “extended reporting” cover age for a minimum of five (5) years after completion of work.

Verification of Coverage
CONSULTANT shall furnish the City with original certificates and amendatory endorsements or copies of the applicabl e policy langua ge effecting coverage required by thi s clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the r equired documents prior to the work beginning shall not waive the CONSULTANT’s obligation to provide them. The City reserves the right to require complete, certified copies of a ll required insurance policies, including endorsements required by these specifications, at any time.

SECTION 16 - NONASSIGNABILITY

Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, a ssigned, or subcontracted by CONSULTANT without the prior written consent of CITY.

SECTION 17 - RELIANCE UPON PROFESSIONAL

SKILL OF CONSULTANT

It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the profes sional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to t hus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from sa id obligation.

Page 21 of 189 ends

-7-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 18 - WAIVERS

The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordi nance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subs equent breach or violation of the same or of any other term, covenant, c ondition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become d ue hereunder shall not be deemed to be a waiver of any preceding b reach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.

SECTION 19 – SEVERABILITY

If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceab le by a court of competent jurisdiction, t he remaining provisions of this Agreement shall continue in full force and effect.

SECTION 20 - COSTS AND ATTORNEY FEES

Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing par ty in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of t he number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of a n action, or actions to enforce the provisions of this Agreement.

SECTION 21 - NON-DISCRIMINATION

CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal em ployment opportunity. Neither CONSULTANT nor any of its subconsul tants shall discriminate in the emp loyment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupati onal qua lification pursuant to the California Fair Employment and Housing Act.

SECTION 22 - MEDIATION

Should any dispute arise out of this Agreement , any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; i n the absence of an agreement, the parti es shall each submit one name from mediators listed by either the American Arb itration Association, the State Mediation and Conciliation Service, or other agreed -upon service. The mediator shall be selected by a blind draw.

The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the

Page 22 of 189 ends

-8-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
prevailing party. No part y shall be permitted to file a legal action w ithout first meeting in mediation and maki ng a good faith attempt to reach a m ediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement i s reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.

SECTION 23 - LITIGATION

CONSULTANT shall testify at CITY'S request if li tigation is brought against CITY in connection with CONSULTANT'S services under this Agreement. Unless the actio n is brought by CONSULT ANT, o r is based upon CONSULTANT'S wrongdoi ng, CITY shall compensate CONSULTANT for preparation for testimony, testimon y, and travel at CONSULTANT'S standard hourly rates at the time of actual testimony.

SECTION 24 - NOTICES

All no tices hereunder shall be giv en in writing and mailed, postage pr epaid, addressed as follows:

To CITY: City Engineer
City of Daly City
Public Works – Engineering Division
333 90th Street
Daly City, CA 94015

To CONSULTANT: J. Ryan Shafer, PE, GE
NCE
501 Canal Blvd, Suite I
Richmond, CA 94804

SECTION 25 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT

This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotia tions, representations, and a greements, either written or oral.

This document may be amended only by written instrument, signed by both CITY and CONSULTANT.

Page 23 of 189 ends

-9-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 26 – AUTHORITY TO ENTER INTO AGREEMENT

CONSULTANT has all requisite power and authorit y to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have s igned this Agreement have the legal power , right, and authority to make this Agreement and to bind each respective party.

SECTION 27 - GOVERNING LAW AND VENUE

This Agreement sha ll be go verned by the l aws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.

IN WITNESS WHEREOF, CITY and CONSULTANT hav e executed t his Agreement the day and year first above written.

CITY OF DALY CITY CONSULTANT

NCE

_______________________________ _________________________________ Shawnna Maltbie J. Ryan Shafer, PE, GE
City Manager Principal-in-Charge

APPROVED AS TO FORM

_______________________________
Rose Zimmerman
City Attorney

Page 24 of 189 ends

City of Daly City

PROPOSAL
2022-2023 Street Resurfacing Project
Revised - April 18, 2022
Submitted By:

Point Richmond Office
501 Canal Blvd., Suite I
Point Richmond, CA 94804
Phone: 510.215.3620

Page 25 of 189 ends

Richmond, CA
501 Canal Blvd., Suite I
Richmond, CA  94804
(510) 215‐3620
April 5, 2022
Hillary Tung, Engineer I/Project Manager
City of Daly City
Public Works Department – Engineering Division
333 90th Street
Daly City, CA 94015
(650) 991‐8165
Proposal sent via email to:   [email protected]
RE:  Proposal for the 2022‐2023 Street Resurfacing Project Dear Ms. Tung and Members of the Selection Committee:

NCE  and  NCE’s  proposed  Project  Manager,  Victor  Lemus,  PE,  recognize  the  importance  and  impacts  pavement resurfacing/rehabilitation projects can have on a City and its residents.  With over 256 centerline miles of roadway, the City’s pavement network represents a significant asset that is highly visible and important to the community and local businesses, and therefore requires good decision making as to how to best manage and maintain. Having worked with the City in a pavement resurfacing project back in 2016‐2017, NCE’s goal is to continue to partner with the City to deliver pavement rehabilitation and civil design documents that balance long‐term pavement performance and sustainability, cost‐effective  design  and  construction,  future  maintenance,  ADA  compliance,  and  minimal  traffic  disruptions  during construction.

NCE is a multi‐faceted civil engineering, pavement engineering, landscape architecture, and environmental service firm, which specializes in developing and designing pavement maintenance and resurfacing/rehabilitation programs for public agencies all throughout California. NCE is a powerhouse known for delivering comprehensive multi‐year pavement work plans  and  civil  engineering  projects  involving  pavement  management  and  value  engineering,  pavement resurfacing/rehabilitation, road reconstruction, complete streets elements, and green infrastructure solutions.

NCE  has  successfully  completed  multi‐year  work  plan  updates,  pavement  resurfacing/rehabilitation,  reconstruction programs,  and  civil  design  for  municipalities  throughout  the  Metropolitan  Bay  The  NCE  team  provides  the  following benefits and distinguishing features to deliver the City’s project:

Proven  History  with  Bay  Area  Agencies  –  NCE  has  dedicated  staff  and  a  large  team  of  professionals  to successfully complete pavement resurfacing, rehabilitation, and reconstruction projects for in the Bay Area for over 15 years, which is comprised of over thousands of centerline miles of streets.

Knowledge  of  Daly  City  –  NCE  worked  with  the  City  back  in  2016  to  develop  the  Junipero  Serra  Boulevard, Geneva Avenue, and San Pedro Road Pavement Rehabilitation Project.

Pavement  Expertise  –  Pavement  management,  research  and  design  expertise  to  prioritize  and  structurally evaluate pavements to develop customized treatment strategies.

Qualified Staff – Highly qualified, responsive staff with proven experience in all facets of engineering, including civil and pavement, with the ability to work as a partner and extension of City Staff. In addition, NCE staff are industry leaders in ADA design and pedestrian and bicycle solutions.

Highly Focused on Supporting Municipalities – About 85% of NCE’s clientele is within the public sector, which includes current on‐call contracts with many California agencies supporting the delivery of Public Works projects.

Local  Regulatory  Requirements  –  NCE  has  familiarity  with  local  regulations  as  well  as  working  with  many Metropolitan Bay Area cities, utilities, and communities.

Page 26 of 189 ends

Richmond, CA
501 Canal Blvd., Suite I
Richmond, CA  94804
(510) 215‐3620
NCE’s Representative Leads
The NCE team will be led by proposed Project Manager, Victor Lemus, PE, who will be responsible for day‐to‐day project management as well as communicating/coordinating regularly with the City. Victor is known for his expertise leading and managing street rehabilitation projects with varying degrees of complexity from simple surface residential seal programs to  large  and  intricate  rehabilitation  and  complete  street  project  on  arterial  streets.  He  currently  serves  as  Project Manager and/or Civil Design Lead on large, multi‐discipline street rehabilitation projects including most recently South San Francisco ($17 million street program), San Mateo, and Pacifica requiring complete street elements and complicated ADA improvements at NCE. Victor is highly adept at managing projects and he will work closely with a highly qualified interdisciplinary  cohesive  team  of  professionals  that  have  previously  worked  together  on  similar  projects  involving infrastructure, roadway, and pavement engineering design. In addition, he was on the NCE engineering design team for the City of Daly City’s 2016 Street Resurfacing Project. Victor will be supported by J. Ryan Shafer, PE, GE, Principal of NCE’s Richmond office. Ryan will provide project oversight and will be responsible for ensuring the resources required for the completion of this project are met. He is an experienced Principal and Project Manager that is known for his ability in managing, overseeing, and providing oversight on all aspects of pavement management, rehabilitation, reconstruction, and complete streets.

Contract Manager and Proposal Contact Information
As  a  Principal  of  NCE,  J.  Ryan  Shafer,  PE,  GE,  is  authorized  to  negotiate  and  contractually  bind  the  firm  to  the  City’s agreement. NCE’s proposed Project Manager, Victor Lemus, PE, will be the primary point of contact for clarifications that may arise during the proposal evaluation period. Their contact information is as follows:

Authorized to Bind Company  Project Contact  NCE Local Office Mr. J. Ryan Shafer, PE, GE  Mr. Victor Lemus, PE  501 Canal Blvd, Suite I Principal‐in‐Charge  Project Manager  Richmond, CA 94804 Phone: (510) 215‐3620  Phone: (510) 215‐3620 Phone: (510) 215‐3620 Email: [email protected]  Email: [email protected]  Fax: (510) 215‐2898 Required Statements
This  proposal  shall  remain  effective  for  ninety  (90)  days  from  beyond  the  date  of  this  submittal.  In  addition,  NCE acknowledges receipt of Addendum No. 1 and No. 2 dated March 24, 2022, and April 1, 2022, respectively.

The NCE team is committed to the City and the success of your pavement engineering projects. We are very interested in continuing our working relationship with the City to deliver this project. NCE looks forward to your favorable review of our proposal and the opportunity to work again with the City of Daly City.

Sincerely,
NCE

Victor Lemus, PE       J. Ryan Shafer, PE, GE
Project Manager       Principal

Page 27 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | iii
Table of Contents
Cover Letter
1)  Implementation Plan .................................................................................................................................................... 1 2)  Experience and History ............................................................................................................................................... 12 3)  Organization Chart ..................................................................................................................................................... 19 4)  Fee Schedule ............................................................................................................................................................... 39 5)  Preliminary Sheet List and Technical Specifications Sections .................................................................................... 43 6)  Required Statements .................................................................................................................................................. 43

Page 28 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | 1
1) Implementation Plan
Project Understanding
As part of the 2021 Engineering On‐Call, Daly City (City) is seeking a consultant to complete pavement and civil design services  for  their  2022‐2023  Street  Resurfacing  Project (Project). Like many public agencies the City is wanting to pave  the  greatest  number  of  streets  and  strike  the  right balance  between  cost,  performance,  and  impacts  to  the public.  Our  staff  understand  this  and  are  prepared  to discuss and present a number of cost‐effective pavement treatment  alternatives  based  on  field  investigation  and observed  pavement  conditions.  NCE  has  experience  with conventional  overlay  and  reconstruction  methods  and alternative cost recycle in‐place technologies that offer up cost savings, such as Full Depth Reclamation (FDR) and Cold In‐place  Recycling  (CIR).  Based  our  initial  field  review  and  NCE’s  knowledge  of  unit  costs  based  in  the  Bay  Area  for pavement treatments, it appears the expected project will be on the order of $2.8 million in construction.

The planned streets to receive resurfacing are shown in the attached street list which shows pertinent street features. In general, the streets are mostly comprised of residential streets totaling about 2.3 miles. NCE conducted a preliminary street review to better understand pavement conditions and develop preliminary treatments for the purposes of refining the scope of work. In the attached table we provided preliminary pavement treatments for each street section along with preliminary field review notes summarizing pavement conditions, the number of curb ramps that are not ADA compliant and need replacement, and anticipated construction cost per street. From the PCI scores provided in Table 1 and the field review we expect the subject streets to be mostly candidates for resurfacing (mill and overlays or surface reconstruction) and a few reconstruction sections.

Streets that have pervasive pavement failures and fatigue cracking should be carefully evaluated for reconstruction based on  pavement  section  measurements  and  subgrade  characterization.  Street  reconstruction  can  be  very  costly,  highly impactful, and introduce utility conflicts. It is important to limit depth of treatment/excavation, when possible, with surface reconstruction that removes old and tired pavements with a new asphalt section that utilizes the existing base materials.  If  surface  reconstructs  are  not  feasible  based  on  insufficient  thickness  of  remaining  base  materials  or problematic subgrade, reconstruction of the pavement structure may  be  required  including  consideration  of  full  depth  AC, conventional  reconstruction  with  asphalt  concrete  and aggregate base, and cost saving FDR.

For example, Belcrest Avenue (see figure to the left) is candidate for  reconstruction  and  possibly  FDR  given  the  pervasive  base failures  in  combination  with  heavy  traffic  load  (i.e.,  Bus  110 route) and evidence of pumping in base of subgrade materials.

This section was surface sealed before without base repairs, and reflective  cracking  was  observed  along  the  entire  section.  The FDR  treatment  would  pulverize  the  existing  pavement  section and mix with cement additives to provide a stable base material upon which to place a new asphalt concrete wearing course. The FDR method recycles the materials in‐situ and can offer significant cost savings over conventional roadway reconstruction techniques. It is generally cost‐effective for areas as little as 25,000 sf.

Belcrest Avenue ‐ FDR

Page 29 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 2
Edgemar Street between Mar Vista Drive and the end is a lower traffic  street  and  a  potential  candidate  for  surface reconstruction  (SR)  and  subgrade  recompacting  (see  figure  to the right). More than 80% of pavement area exhibited medium to high severity fatigue cracking with weathering and raveling.

Surface  reconstruction  includes  removing  the  entire  asphalt section  and  part  of  the  base,  recompacting  the  existing  base materials,  and  then  placing  a  new  asphalt  concrete  pavement section  suitable  for  residential  traffic  including  garbage  trucks and have a stable base for a new overlay. This process is ideal for  sections  with  thinner  asphalt  sections  with  underling sufficiently thick aggregate base section and will be more cost‐ effective than mill and fill if the base repair percentage exceeds 30 to 40% of the total area. In addition to being more cost effective a surface reconstruct offers additional benefits including given less disruption to residents, reduced utility conflicts, ability to provide a new asphalt pavement section more suitable to heavier loads from garbage trucks, and from a sustainability perspective the ability to re‐use existing roadway base materials. A typical assumption for SR streets is that final paving grades will match approximately the existing grades.

Several street sections may also be candidates for surface seals to reduce treatment costs, which we can discuss further given that  this  is  predominantly  a  rehabilitation  project  or  possibly deferring  to  the  City’s  surface  seal  program.  An  example  is Carter  St  (picture  shown  to  the  right)  with  a  PCI  of  51  and existing  field  conditions  show  only  minor  cracking  and  base repair percentages less than 5% of the total area. This section would  be  better  suited  for  a  cape  seal  or  microsurfacing  and these treatments would provide a more cost‐efficient solution than a more involved and costly rehabilitation or reconstruction alternative.

NCE will provide civil engineering and pavement design services in accordance with the following tasks.

Key Assumptions
Based on delivery of a similar project with the City and in order to deliver the most cost‐effective design strategy, we have made the following key assumptions:

City’s Responsibilities
NCE has assumed that the City will be able to provide the following:

1. Provide  information  regarding  utilities  (i.e.,  sanitary  sewer  and  storm  drain),  ROW  and  property  limits,  site features and existing construction as is available from City.

2. Provide project requirements, including design objectives, budget, constraints, and criteria.

3. Provide existing City technical specifications as the basis for developing new technical specifications.

4. Front‐End specifications including General Provisions, Special Provisions, Special Conditions, and Proposal.

5. Provide City Standard Provisions and Standard Design Criteria.

6. Provide electronic files of City cover sheet template, if preferred.

PAVEMENT TESTING AND DESIGN

1. Pavement design will be based on Caltrans Standards with a combination of coring, pavement condition surveys, laboratory testing of subgrade, and observed field conditions depending on rehabilitation strategy.

Edgemar Street ‐ Surface
Reconstruction
Carter Steet ‐ Surface Seal

Page 30 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 3

2. Pavement coring will be performed on all street sections with spacing criteria and bulk samples as follows:
a. Pavement cores will be obtained approximately every 1,000 to 1,500 feet and a minimum of 2 cores per street section, unless section length is less than 500 feet only one core may be obtained. b. A minimum of one bulk sample of subgrade will be obtained per street section for those sections preliminarily identified as surface reconstruct or full‐depth reclamation (FDR) for laboratory testing including R‐value, Plasticity Index, and Moisture Content. The potential surface seal or mill and overlay sections will be assumed to not require bulk samples as subgrade investigation is typically not needed for these treatments.
c. AB thickness will be measured at all coring locations either at bulk sample locations (8” diameter core) by direct measurement or by using Dynamic Cone Penetrometer (DCP) at the 4” diameter core holes.

3. Base repairs will be measured in length and width to estimate base repair bid quantities for all street sections.

It is the intent that base repair quantities will be for bidding quantity purposes only, and that actual locations will be marked by NCE with City inspectors prior to construction.

4. A no fee encroachment permit will be pulled with the City for all pavement testing.

TOPOGRAPHIC SURVEYING AND BASE MAPS

1. A topographic survey will be completed for each street section from back‐of walk to back‐of‐walk to establish a base map sufficient for developing civil design plans. This will also include record data location of the existing right‐of‐way for the mapping corridor. This is provided in our base fee estimate based on our discussions with the City and request to include a fee estimate with topographic survey of each street section.

TOPOGRAPHIC SURVEYING AND BASE MAPS (ALTERNATIVE)

1. If  pavement  grades  can  generally  be  maintained  at  the  subject  street  sections,  we  judge  that  a  more  cost‐ effective approach for rehabilitation streets (mill and overlay or surface reconstruction) would be to  utilize City or County base/aerial base maps in lieu of topographic surveys. A topographic survey would still be completed for streets requiring reconstruction of the entire pavement structure (e.g., FDR) or regrading and at each of the curb ramps identified on the street list table (59 total). The City may elect to add additional curb ramp locations within the project area, and it is assumed these additions will occur prior to commencing the topographic survey work.

2. Design  sheet  information  for  non‐topo  streets  will  be  based  on  field  inventories  and  approximate  field measurements  to  verify  items  such  as  utility  covers,  cross‐slope,  street  widths  and  lengths,  medians,  repair candidates for curb & gutter, and striping.

3. Sections placed onto City or County basemaps (no topo) will be assumed not to require drainage improvements, complex changes in street geometry, or full pavement section reconstruction.

UTILITY COORDINATION AND LOCATION

1. NCE  will  prepare  and  distribute  utility  notification letters  to  collect  facility  maps  and  as‐builts,  confirm utility  planned  work,  and  notify  utilities  of  the  City’s utility  cut  moratorium  on  improved  streets.  NCE  will prepare  and  distribute  a  second  round  of  letters including utility location information based on ground
penetrating  radar  (GPR)  that  is  provided  for  all  street sections  to  solicit  feedback  and  need  for  utility relocation or adjustments.

2. Utility  location  will  be  completed  using  GPR  to  field locate  and  mark  utility  alignments  and  approximate depths  of  utility  mains  and  laterals  within  all  street sections to the extent that GPR methods can detect utilities. Utility location markings will then be included in topographic surveys. This GPR data is for initial planning purposes with utilities and will be provided as a courtesy to utilities to help expedite their assessments. Utilities will be responsible to review their facilities, perform utility Frankfort Street

Page 31 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 4
potholes,  if  necessary,  to  determine  if  they  have  a  utility  conflict  that  requires  adjusting  or  lowering  of  their facilities.

3. Utility covers will be inventoried for the purpose of developing bid quantities for adjustment of utility covers.

UTILITY COORDINATION AND LOCATION (ALTERNATIVE)

1. NCE will prepare and distribute utility notification letters to collect facility maps and as‐builts, confirm utility planned work, and notify utilities of the City’s utility cut moratorium on improved streets. NCE will prepare and distribute  a  second  round  of  letters  including  utility  location  information  based  on  ground  penetrating  radar (GPR)  that  is  provided  for  only  street  sections  currently  identified  for  reconstruction  of  the  entire  pavement section with topographic survey to solicit feedback and need for utility relocation or adjustments.

2. Utility location will be completed using GPR for streets requiring reconstruction of the entire pavement section (e.g., FDR) or require significant changes in grades to field locate and mark utility alignments and approximate depths of utility mains and laterals to the extent that GPR methods can detect utilities. Utility location markings will then be included in their respective topographic surveys. This GPR data is for initial planning purposes with utilities  and  will  be  provided  as  a  courtesy  to  utilities  to  help  expedite  their  assessments.  Utilities  will  be responsible to review their facilities, perform utility potholes, if necessary, to determine if they have a utility conflict that requires adjusting or lowering of their facilities.

3. Utilities  will  not  be  located  in  alignment  or  depth  in  rehabilitation  streets  (surface  reconstruct  or  mill  and overlay).

4. Utility covers will be field located approximately in rehabilitation streets and inventoried for the purposes of placing onto plan sheets and developing bid quantities for adjustment of utility covers.

TRAFFIC STRIPING

1. Traffic striping is assumed to match existing striping.

2. No  significant  traffic  striping  changes  or  design  requiring  traffic  studies  or  assessment  of  traffic  impacts  is planned or included as a part of this scope.

3. Striping  plans  will  be  developed,  and  striping  types  and  quantities  will  be  inventoried  for  the  purposes  of developing bid quantities.

TRAFFIC CONTROL PLANS

1. Traffic control plans are not included in scope of work. We have assumed as is typical to have contractor prepare traffic control plans in accordance with project technical specifications and requirements and submit to the City traffic engineering group for review.

CURB RAMPS

1. It is assumed that all non‐compliant curb ramps will be replaced or retrofitted (e.g., detectable warning surface embedded in concrete) in accordance with Caltrans standards for rehabilitation street candidates.  Curb ramps will be replaced or retrofitted based guidance from the Department  of  Justice/Department  of  Transportation
Joint  Technical  Assistance  on  the  Title  II  of  the Americans  with  Disabilities  Act  Requirements  to
Provide Curb Ramps when Streets, Roads, or Highways
are  Altered  through  Resurfacing  dated  July  8,  2013.

Further  clarification  on  curb  ramp  replacement
included in this scope of work is as follows:
a. Utility relocations (e.g., utility poles, utility boxes, and drainage inlets) required to construct curb
ramps are not included in this scope of work.
b. All ramp construction shall be within City Right‐of‐ Way.

Surrey Court

Page 32 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 5
c. Curb ramp design for the purposes of this scope of work includes paving conforms between 1 to 15 feet beyond gutter lip or face of curb, or 2 feet beyond back of sidewalk. d. For curb ramps within hills or steepened grades, curb ramp design shall only extend up to 15 feet in the uphill direction, beyond which is considering chasing the grade.

2. Curb ramps will be field verified to determine the appropriate standard case ramp and NCE will develop a curb ramp detail for those that will require a custom curb ramp.

3. Steep curb ramps will require design iterations  at 65%, 95%, and 100% draft design level to determine the most appropriate ramp.

DRAINAGE

1. The  project  will,  to  the  extent  possible  and  within  the  context  of proposed rehabilitation, address visible drainage issues.

2. No  major  drainage  improvements  are  assumed  for  this  project requiring  significant  stormwater  drain  and  pipe  alteration  and/or reconstruction.

CURB & GUTTER AND SIDEWALK

1. Curb  and  gutter  sections  will  only  be  replaced  to the  extent that  it affects pavement treatment (e.g., tree root uplift or settlement) or to improve drainage.

2. Sidewalk replacement is not included in this scope of work but can be added if required for additional scope and fee.

3. The  purpose  of  our  services  will  be  to  provide  civil  and  pavement engineering design in support of the planned project by the City. To accomplish the stated purpose, we propose the following scope of services:

Scope of Work
To accomplish the stated purpose, we propose the following scope of services:

Task 1 – Project Management & Meetings
SUBTASK 1A: PROJECT KICK‐OFF MEETING/PROGRESS MEETINGS
NCE’s Project Manager will arrange a Kick‐Off Meeting with the City to initiate work on the project.  The objectives of the Kick‐Off Meeting will be:

Review of the Scope of Work
Establish Lines of Communication
Confirm Deadlines
Establish Project Schedule and Milestones
Define Design and Operation Criteria.

Whether a simple preventative maintenance project or a complex reconstruction project, it is critical to establish effective lines of communication with, and coordination amongst, the various stakeholders from the start to ensure the delivery of a successful project within budget and on schedule. In addition to City Staff (Engineering, Maintenance, etc.), NCE will research  and  coordinate,  as  needed,  with  other  agencies  such  as  PG&E,  AT&T,  Daly  City  Water  and  Wastewater Resources, Schools, etc., to identify any potential conflicts, requirements, or design issues early to help minimize delays (and costs) later in the design process or during construction.  At the Kick‐Off Meeting, key deliverables for each Task and the Project Schedule will be reviewed and adjusted accordingly to meet City needs.

NCE understands construction costs, particularly the volatile price of materials, which have affected the scope of many similar  projects.   In  order  to  keep  the  City  aware  of  overall  project  costs,  NCE  will  begin  developing  Preliminary Engineering Cost Estimates as soon as we have developed our engineering design recommendations to closely monitor Frankfort Street

Page 33 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 6
any potential funding issues, which may develop.  During the course of the project, NCE will be seeking to develop the most appropriate and cost‐effective pavement rehabilitation alternatives to stay within the planned project budget and schedule.

Throughout the project, the NCE PM and Technical Lead will be available to attend monthly progress meetings (maximum of  10  up  to  1  hour  each  per  staff)  and  a  total  of  three  (3)  design  review  meetings  with  the  City,  to  maintain  good communication and update on project progress.   The purpose of the progress meetings will be to identify and resolve any design or funding issues that may surface in a timely manner, present design alternatives and recommendations to City staff, and continue coordination with project stakeholders as necessary.

Subtask 1A Deliverables: Kickoff/Progress Meeting Agendas and Minutes.

SUBTASK 1B: UTILITY COORDINATION
NCE  will  coordinate  with  utility  agencies  early  in  the  design  process  to  help  avoid  potential  construction  delays  and unnecessary disruptions to public services. Utility coordination will be a critical item to keep utility providers informed about  the  project  and  schedule  to  allow  for  proper  notification  and  planning  should  utility  providers  have  planned maintenance projects within the subject street sections and/or need to lower/adjust their utilities to accommodate street rehabilitation  and  particularly  reconstruction.  One  of  the  first  and  earliest  items  that  NCE  will  complete  is  sending notification  letters  to  applicable  utility  providers  with  a  preliminary  project  schedule  for  street  rehabilitation  and reconstruction.  This  will  allow  for  the  earlier  notification  to  allow  utility  providers  to  perform  maintenance  on  their facilities prior to moratorium on the street paving area and/or assess their utilities and the possible need to lower/adjust their facilities, which can take up to a year or longer. We will also request utility as‐builts and record drawings for street sections planned for reconstruction.

NCE will also carefully document all utility coordination notifications, conversations, and meetings with utility contacts and information in a matrix format with dates of contacts and mailing detailed in this matrix.  Follow‐up will be made for each of the above notifications to confirm receipt.  NCE will also keep the City informed of any project delays related to utilities.

Subtask 1B Deliverables: Utility notification letters and Contact List Matrix.

Task 2 – Pavement Rehabilitation Design
The scope of work we would perform under this task consists of the following:

SUBTASK 2A: PAVEMENT AND CURB & GUTTER CONDITION SURVEY NCE will perform a pavement condition survey of each street section based on distresses.   The surveys will generally cover  the  travel  lanes.   Pavement  condition  surveys  serve  the  purpose  of  further  refining  the  appropriate  pavement rehabilitation treatments that are developed based on coring and lab testing.

This  condition  survey  will  generally  note the  presence of  load  related  and  environmental  distresses,  such  as alligator cracking,  longitudinal  and  transverse  cracking,  rutting,  patches  and  utility  cuts,  distortions  and  depressions  as  they pertain to developing appropriate pavement treatments.  In addition, base repairs percentages will be estimated in the condition survey.   Our scope of work and condition surveys do not address issues including but not limited to traffic, safety and road hazards, geometric issues, or short‐term maintenance that should be performed (i.e., pothole that should be repaired).

A visual assessment of all curb and gutters will be included to identify areas where drainage or the adjacent pavement has been compromised.  Our scope will limit repair recommendations to only those sections of curb and gutter that are damaged to the extent that they will affect pavement rehabilitation and flowline obstructions.   If damaged curb and gutter areas are more extensive than anticipated, it may require additional time to complete, and we will notify the City if more time is required to complete these surveys.

Prior  to  looking  at  curb  and  gutter,  NCE  will  meet  with  the  City  and  establish  condition  criteria  for  assessment  and replacement.   Based on the criteria established with the City, NCE will then determine what level of curb and gutter replacement will be pursued for design plans and documents.

Page 34 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 7
SUBTASK 2B: PAVEMENT CORING
NCE will collect pavement section core samples (4” – 8” diameter cores) on streets identified under key assumptions at locations determined by NCE. All coring locations will be marked with white paint for utility location by Underground Service  Alert  (USA).  Our  current  fee  estimate  assumes  up  to  28  core  locations  that  we  estimate  will  take  4  days  to complete.

For each core sample, NCE will measure and record the thickness and material type (AC or PCC) of each layer encountered in the pavement section, including the presence of any pavement reinforcing fabric. The thickness of aggregate base (AB) will be measured at all coring locations either at bulk sample locations (8” diameter core) by direct measurement or by using  Dynamic  Cone  Penetrometer  (DCP)  at  the  4”  diameter  core  holes.  We  will  collect  bulk  samples  of  subgrade materials in accordance with key assumptions for laboratory testing such as R‐value, moisture content, and Atterberg Limits (plasticity index) determinations, to support new pavement structural section designs.  Our current fees assume up to 12 bulk samples of subgrade will be obtained for testing only for those sections preliminarily identified as surface reconstruct or full‐depth reclamation (FDR).

The core holes will penetrate through the pavement section and will then be backfilled with the excavated materials and capped with AC cold patch on asphalt streets. NCE will then compile the coring and laboratory data and append it to its Pavement Design Memorandum. Each core sample will be logged and stored at NCE’s office and retained through the duration of the project including construction before they are disposed. Additionally, NCE will apply for and obtain a no‐ fee Encroachment Permit from the City prior to starting the coring. NCE will also provide traffic control in accordance with the latest standards contained within the Manual of Uniform Traffic Control Devices (MUTCD), as well as any local requirements that exist.

SUBTASK 2C: PAVEMENT DESIGN RECOMMENDATIONS
Using  the  data  obtained  in  Tasks  2A  and  2B,  NCE  will  perform  pavement  analysis  and  design  services,  and  develop pavement rehabilitation and reconstruction recommendations for each street section. NCE will perform its analysis in accordance with the Caltrans Highway Design Manual.  NCE will develop pavement structural section recommendations expressed in the form of a Traffic Index (TI) that will be provided by the City. NCE will develop recommendations including, but not limited to, the following:

Reconstruction
o Hot Mix Asphalt (HMA) over AB
o Full Depth HMA
o FDR
Conventional Hot Mix Asphalt (HMA) pavement overlays
Warm Mix Asphalt (WMA)
Rubberized Hot Mix Asphalt (RHMA) overlays
Alternative rehabilitation methods (in‐place recycling, mill & fill treatments, etc.) Quantities and treatments of failed pavement sections (base repairs).

NCE  will  then  summarize  its  recommendations  in  a  Pavement  Design  Technical  Memorandum  to  the  City  that,  at  a minimum, will include the following:

Results of coring, laboratory analyses, and pavement condition surveys Description of testing procedures and analysis performed for the project Recommended alternatives for pavement rehabilitation.

NCE will submit two (2) copies of its draft technical memorandum to the City for initial review.   Upon receipt of any comments from the City, NCE will then prepare its final technical memorandum, which will be signed and stamped by NCE’s Pavement Engineer. Two (2) copies of the final technical memorandum will then be provided to the City reflecting any comments on the draft technical memorandum.

Subtask 2C Deliverables: Draft & Final Pavement Technical Memorandums.

Page 35 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 8
Task 3 – Plans, Specifications & Estimates (PS&E)
The work that will be performed during developing design plans, specifications, and estimates (PS&E) are outlined in the subsequent tasks.

SUBTASK 3A: DESIGN DATA GATHERING
NCE will review relevant available data and records from the City as listed in the previous section, public and private utility providers, and other sources that may be appropriate to support the preparation of project contract documents.

These may include, but are not limited to, the City drainage structure inventory maps, aerial photographs of the City; as‐ built street improvement and infrastructure plans, as‐built plans from utility providers, including any preliminary plans for future work that may conflict with this project.  The gathered information will be compiled and included in the design.

Based on our review we will identify any data gaps or missing information and provide this information to the City for review and discussion.

SUBTASK 3B: UTILITY LOCATION
Using GPR, NCE’s utility locator will field locate utility alignments and depths for utility mains and laterals for utilities within the streets in accordance with key assumptions (or on select streets if alternative plan is preferred) to the extent that  GPR  methods  can  detect  utilities.  GPR  along  utility  mains  will  be  marked  at  various  locations  along  each  street section, and the accuracy for the electronic depths will depend on the soil conditions and utility material. GPR results can be  affected  by  various  factors  such  as  pipe  size,  depth,  and  most  importantly  environmental  factors  such  as  soil conditions, rebar, and subsurface ground water.  If GPR cannot establish utility alignments and or depths, potholing may need to be completed for additional scope and fee. Traffic control will consist of a 1‐man crew with traffic control arrow board and signs. Items excluded from work are as follows:
 Cost of permits and inspection of any kind on this project  Night shift or overtime
 Certified or stamped traffic control plans
 Lane closures
 Pressure washing paint marks.

Subtask 3B Deliverables: Marked utility depth and alignments and electronic collection of utility information.

SUBTASK 3C: TOPOGRAPHIC SURVEY
NCE’s  Project  Surveyor  will  complete  monument/control  recovery,  field  investigation  and  field  surveys  sufficient  to prepare a topographic mapping product for all streets (or on select streets and all 59 curb ramps if alternative plan is preferred)  stated  under  key  assumptions.  The  mapping  shall  be  compiled  at  an  agreed  upon  scale  with  a  1’  contour interval and will be based on the City Datum.

The  mapping  area  shall  be  a  corridor  along  each  of  the  street  sections  (or  on  select  streets  and  all  59  curb  ramps  if alternative plan is preferred)  between the existing back of walk to opposite back of walk, starting and stopping at the designated locations and including through the returns of the terminating streets. In the absence of an existing sidewalk, the survey will extend to 5 feet behind the curb or edge of pavement, or up to the first substantial barrier (wall, fence, etc.), whichever occurs first. Lastly, the mapping will extend 25 feet beyond the curb return up each intersecting side street. The topographic data to be collected is more specifically defined as:

Cross‐sections  at  50’  intervals  along  with  detailed  surface  topography  and/or  additional  spot  elevations,  as required, defining the longitudinal and cross slope grade breaks. Typically, the cross section will include back of walk, top of curb, flowline and lip of gutter, pavement ¼ point (if one exists), and pavement centerline.

Surveyed locations for significant surface features, such as curbs, gutters, sidewalks, driveways, misc. concrete, pavement, striping, fences, surface utilities, trees, signs, street lights and signals will be included. A structure inventory for sanitary and storm drain facilities reflecting rim elevations, invert elevations, pipe direction and pipe size will be provided for accessible structures within the mapping limit. To the extent visible, our surveyor will obtain a measurement from the top of manhole rim to the top of cone and note any adjustment rings. In no case shall our surveyor enter a manhole to obtain any data.

Page 36 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 9
Location  of  all  surfaces  evident  of  street  monumentation  within  the  mapping  corridor  (for  preservation  and Record R/W purposes).

Location of underground utility locator markings.

Provide a finished draft topographic survey for each area of work.

Provide AutoCAD Civil3D DTM surface for each street section.

If the alternative plans is selected,  survey will also be performed at curb ramp corner locations specified on the street list table (59 total). The City may add additional curb ramp locations within the project area; it is assumed these additions will occur prior to commencing the topographic survey work.

Based upon a combination of record data and any monuments collected during topographic surveying, our surveyor will calculate the record data location of the existing right‐of‐way for the mapping corridor. Additionally, our surveyor will calculate and show the location of each adjoining parcel lot line from record data (assessor’s parcel data, record mapping and apparent lines of occupation). It should be noted this property line data will not be based upon a field survey and should be considered approximate only.

Subtask 3C Deliverables: Topographic survey results.

SUBTASK 3D: 65% PS&E
NCE will prepare the 65% PS&E for the planned pavement resurfacing.   The 65% plans will incorporate typical design elements including layout plans for rehabilitation and reconstruction street sections, pavement treatments, right of way parcel lines, preliminary design, wedge grinds, conform grind locations at intersecting side streets, rehabilitation cross sections, curb and gutter repairs, gutter flow line for drainage repairs, and limits of work.  The plans will be prepared in AutoCAD 2018 format on 22” x 34” sheets, drawn at a scale of 1”=20’. Rehabilitation plan sheets will include base repair schedules and will show individual base repair locations. Base repairs will be marked in the field on the pavement in white paint and numbered and verified prior to construction.  Additionally, a table summarizing base repair areas and estimated quantities will be developed and included on the plan sheets.  We also find that this information is particularly useful to contractors when assembling construction bids and schedules, thus resulting in more competitive bids, and to the City for verifying pay quantities during construction.

NCE  understands  that  the  City  will  provide  the  “Front  End”  documents  and  Special  Provisions.  The  Technical Specifications will be prepared in MS Word format and will follow the City’s formatting conventions (CSI MasterFormat 1995 edition). The Technical Specifications and details will reference the City’s standard provisions and 2018 Caltrans Standards  (including  subsequent  updates).  NCE  will,  however,  recommend  deviating  from  Caltrans  standards  where, from  our  experience,  such changes  will  improve  the  likelihood  of  achieving  a  successful  construction  project  without compromising the integrity of the design. NCE recognizes the value of incorporating Caltrans Standard Specifications in projects such as these, both because these specifications have been developed by an agency that designs and builds a vast amount of highway work, and because most contractors performing public works construction in Northern California are  familiar  with  them.  Caltrans,  however,  has  the  resources  to  administer  projects  quite  differently  than  most  local agencies, so NCE advocates modifying the Caltrans Standard Specifications to better fit the abilities, needs, and budgets of municipal agencies.

NCE also believes that an efficient, yet thorough Quality Control/Quality Assurance program is essential for getting the maximum  value  out  of  every  dollar  spent  on  construction.  Projects  designed  by  NCE  therefore,  contain  technical specifications that attempt to optimize the balance between using rigid, but time‐tested, specifications and meeting local agency needs, with the ultimate goal of obtaining the very best value for its clients.

The Engineer’s Cost Estimate will be prepared in MS Excel format and will be based on the most recent construction cost data available to NCE for projects of this type. Because of NCE’s involvement in the design and construction of numerous similar  projects  throughout  California,  we  are  confident  in  our  ability  to  estimate  the  construction  cost  of  the  City’s project.  This initial estimate will then be updated and refined as the design effort progresses.

It is assumed that the City will require a 10‐day review/comment period once the 65% PS&E package is submitted.

Subtask 3D Deliverables: One reproducible copy of 65% plans, technical specifications, and engineer’s estimate.

Page 37 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 10
SUBTASK 3E: 95% PS&E
The 65% PS&E will be revised to incorporate comments received from the City.   NCE will meet with the City to review these  comments,  from  which  the  95%  PS&E  will  be  prepared.  NCE  will  provide  a  response  to  each  comment  that  is included in a comment table provided by the City. The 95% PS&E will include additional design information and details typically expected at this stage of completion, such as utility facilities (storm drain and sanitary sewer manholes, water and gas valves, and survey monuments) that will require adjustments to grade, traffic striping, and pavement legends.

The 95% PS&E will then be packaged and submitted similar to the 65% PS&E unless directed otherwise.

The Technical Specifications will be further refined at this stage of the design. We will review and comment on the City’s front‐end documents (bid and contract forms, General Provisions, Special Provisions, etc.), which the City will prepare and provide.  The Engineer’s Cost Estimate will also be updated to reflect the revised quantities of work depicted on the plans.

It is assumed that the City will require a 5‐day review/comment period once the 95% PS&E package is submitted.

Subtask 3E Deliverables: One reproducible copy of 65% plans, technical specifications, and engineer’s estimate.

SUBRAKS 3F: 100% DRAFT PS&E
The  95%  PS&E  will  be  revised  to  incorporate  comments  received  from  the  City. NCE  will  again  meet  with  the  City  to review these comments, from which the 100% Draft PS&E will be prepared. NCE will provide a response to each comment that is included in a comment table provided by the City. The 100% Draft PS&E will include all notes and details necessary for bidding. One reproducible copy of the 100% Draft PS&E will then be packaged and submitted similar to the 95% PS&E unless directed otherwise. It is assumed that the City will require a 5‐day review/comment period once the 100% Draft PS&E package is submitted.

Subtask  3F  Deliverables:  One  reproducible  copy  of 100%  draft  plans,  technical  specifications,  and  engineer’s estimate.

SUBTASK 3G: ISSUED FOR BIDDING PS&E
Upon receipt of the City’s final review comments, the project documents will be finalized for bidding purposes.

A  final  quantity  calculation  will  be  tabulated,  and  this  will  be  entered  into  the  final  Engineer’s  Cost  Estimate  for  the project. All final documents will be reviewed, stamped and signed by NCE’s registered civil engineer, and the final PS&E will be delivered to the City in electronic formats.

Subtask 3G Deliverables: One electronic file of the final plans, technical specifications, and engineer’s estimate.

The electronic files for the final construction plans, specifications, and engineer’s estimate will be in AutoCAD 2018, Microsoft Word, and Microsoft Excel, respectively.

Task 4 – Bidding and Construction Support Services
SUBTASK 4A: BID PHASE AND BID PHASE SUPPORT
NCE will provide the City with assistance during the advertisement and bidding periods for the project. This will include providing assistance to the City in attending the pre‐bid meeting, responding to questions received about the project design, and preparation of any addenda and/or clarifications to the PS&E that are deemed necessary. Our attached fee estimate shows the office staff hours allocated for the support during bidding; if additional effort is required beyond this, we will notify the City.

Subtask 4A Deliverables: Contract addenda and answers to bidders’ questions, if needed.

SUBTASK 4B: CONSTRUCTION SUPPORT SERVICES
NCE  will  provide  support  services  to  the  City  during  construction  of  the  project.  At  a  minimum,  these  services  are anticipated  to  include  attendance  at  the  pre‐construction  conference  meeting,  on‐site  visit  in  response  to  questions regarding  design,  reviewing  Contractor  submittals  and  responding  to  Contractor  requests  for  information,  providing recommendations for any necessary construction changes due to unforeseen field conditions, assisting with the review of Contract Change Orders, reviewing construction for acceptance (final walk through), and provide record drawings. This task does not provide any field inspection services and we understand that all construction inspection will be provided

Page 38 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 11
by the City. Our attached fee estimate shows the staff hours allocated for office and field support during construction. If additional effort is required beyond these estimated staff hours, we will notify the City.

Subtask 4B Deliverables: Response to RFIs, contract change orders, modifications or revisions related to project original scope and character, and record drawings.

Task 5 – Additional Per Each Curb Ramp Survey and Design (Optional Task) NCE and NCE’s Project Surveyor will provide additional services on a per curb ramp basis for additions to the original scope of ramp design total. The original scope of work assumes up to 56 locations will need topographic surveying and curb ramp design. For the additional survey and design cost per each ramp, we have assumed the ramps to be within the project area and the number and location of ramps will be determined with the City Project Engineer prior to beginning the topographic surveying work. Subtraction of curb ramp design will be assumed to have the same refund cost to the City as shown in the attached fee estimate.

Page 39 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | 12
2) Experience and History
NCE’s History and Capabilities
NCE  is  a  client‐focused  engineering,  science,
planning,  and  construction  services  firm  with
over  110  employees  housed  in  five  offices,  including  three  in Northern  California,  one  in  Southern  California,  and  our headquarters  in  Reno,  Nevada.  Services  for  this  contract  will  be primarily provided from our local Richmond office. Since inception, NCE has focused on developing long lasting client relationships by providing high value services. Our clients repeatedly choose to work with  NCE  staff  because  of  our  collaborative  style  of  working  on projects, our commitment to making sure the project is a success, and the confidence they have in our ability to complete the project to their satisfaction. More than 85% of NCE’s revenues come from local,  state,  and  federal  agencies  providing  NCE  with  an  in‐depth  understanding of current regulations, policies, and procedures, as well as best practices.

Civil  Design  –  NCE’s  civil  and  pavement  design  engineers  and  technicians  are  experienced  in  developing plans, specifications, and engineer’s cost estimates (PS&E) for many  City, County, and State Roadway Projects. The benefit  of  this  experience  to  the  City  is  that  we  thoroughly  understand the cost and community impacts of our recommended pavement designs. NCE staff pride themselves in  thinking about how construction will impact a neighborhood,  a  busy  arterial,  or  pedestrian  bicycle  traffic  and  access.  Our  civil  engineers  are  well  versed  in civil  design  elements  that  include  drainage  improvements,  such  as  stormwater  run‐off  reduction,  landscape  and planter  improvements,  ADA  curb  ramps  and  sidewalks,  curb  and  gutter,  traffic  striping  and  signs,  and  utility relocation.

Complete Streets –  We understand the importance of incorporating and designing complete streets elements, such as bulbouts, landscaping, green infrastructure (e.g., bioretention), bus transit improvements, lighting, restriping, road diet, buffered and separated bike lanes, and dedicated bike lanes, into street improvement projects – making them safe for multi‐modal users, including transit riders, motorists, bicyclists, and pedestrians.  We  recently  completed  a  quick‐build  design  of  new bicycle and pedestrian facilities for the City of Richmond to connect the planned bike and pedestrian pathway across the Richmond‐San Rafael Bridge with key transit centers, including the Richmond BART Station  and  Richmond  Ferry  Terminal.  When  rehabilitating  or designing complete streets, NCE meets with our clients to discuss options to improve safety and overall user experience, whether it is crossing  the  street,  bicycling  to  work,  or  calming/slowing  traffic.

NCE  is  the  prime  design  consultant  on  the  $15  million  Rumrill Boulevard complete street multi‐modal corridor project for the City of San Pablo shown in the rendering to the right.

Utility Coordination – We understand the implications of utilities to  street improvement and resurfacing projects, particularly those identified for reconstruction. Utilities can result in unplanned costs, delays, and street cuts in newly resurfaced streets. NCE has communicated with utilities, such as PG&E, Comcast, AT&T, Daly City Department of Water and  Wastewater  to  ensure  we  understood  what  utility  work  was  planned  and  identify  potential  conflicts.  NCE  also coordinates with utility owners throughout the project to obtain facility maps for cross‐checking and to appraise them of the proposed work (maximum excavation depth) and notify them of the City’s cut moratorium. During reconstruction, NCE, Richmond
City of San Pablo Rumrill
Boulevard Complete
Streets and Green
Infrastructure Project

Page 40 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 13
utilities become even more important requiring accurate location of utility alignments to prevent damage and conflicts.

NCE has used private utility locators to establish utility depths using cost saving and non‐invasive techniques, such as Ground  penetrating  radar  (GPR)  in  lieu  of  more  invasive  and  expensive  potholing.  On  several  streets  where  shallow utilities  exist,  particularly  laterals,  NCE  uses  thinner  pavement sections,  such  as  full‐depth  hot  mix  asphalt  (HMA)  to  reduce conflicts with utilities.

ADA Compliance –   These types of projects require a detailed and  multi‐modal  mindset.  This  requires  attention  and considerations  to  cross‐slopes  and  running  slopes  for  ADA, drainage patterns when adding bulb‐outs to shorten crosswalk distances or provide traffic calming. For example, the picture to the right shows a common situation in streets with high slopes where  the  curb  ramp  design  will  require  a  design  exception (chasing the flare to 15’ max and conforming to existing sidewalk grades). NCE will also coordinate curb ramp alterations with required alterations to the roadway striping plans such as crosswalks and vehicle or bicycle detector loops.

Green Infrastructure – NCE’s Engineers and Landscape Architects incorporate Green Infrastructure elements into their projects  to  provide  communities  with  healthier  public  spaces,  visually  appealing  streetscapes,  enhanced  pedestrian experience,  storm  water  quality/management,  reduced  impervious  pavements  and  minimize  the  impacts  of  climate change. Specific techniques include the adaptive reuse of tires as a component of rubberized cape seals and hot mix asphalt, reducing heat island impacts with the use of light aggregate and replacing impervious pavements with permeable pavers  within  parkways.  With  an  innovative  approach,  NCE’s landscape  architects  worked  with  South  San  Francisco  on  its 2021  Green  Infrastructure  Program  to  study  opportunities  to integrate  a  range  of  green  infrastructure  elements  such  as stormwater planters, permeable paving and street trees into the City’s  streetscape  in  coordination  with  proposed  pavement rehabilitation.  Several  of  these  Green  Infrastructure  Elements will  be  constructed  and  will  serve  as  a  model  for  other communities to take a holistic approach to addressing issues of Stormwater Quality and Management, Climate Change Impacts, Pavement Management, Aesthetics and Placemaking.

Roadway  Maintenance  and  Pavement  Rehabilitation  –  Street  rehabilitation extends well beyond the pavement and often requires important considerations, such  as  striping,  curb  and  gutter  repairs,  pedestrian  and  bicycle  improvements, signage, utility relocation, drainage improvements, and ADA compliant curb ramps and  sidewalks.  NCE  has  developed  outstanding  working  relationships  with  our clients, implementing projects similar to the services described in the City’s scope of services. NCE provides a full spectrum of roadway pavement design services from conceptual  engineering  to  plans,  specifications,  and  engineer’s  estimate  of probably construction cost (PS&E) for preventive maintenance, rehabilitation, and reconstruction, NCE’s specialty.

We offer extensive experience and expertise with pavement treatment alternatives (cost  saving,  cutting‐edge,  and  green/  sustainable  paving  technologies,  such  as warm  mix  asphalt  and  in‐place  recycling  technologies).  Our  civil,  pavement,  and geotechnical engineers not only understand the types of pavements and treatment options,  but  they  also  understand  the  significance  and  cost  implications  of  proper  roadway  support  on  competent subgrade  soils  to  limit  future  settlement  and  cracking.  Pavement  design  begins  with  an  accurate  assessment  of  the existing structural adequacy. Unlike traditional civil firms who rely only on core samples and R‐values, we employ our

Page 41 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 14
pavement survey expertise in conjunction with deflection data and materials testing to assess the engineering properties of the existing roadway more accurately.

Deploying  Pavement  Technologies  –  Simply  offering  innovative  pavement technologies does not always solve the problem; rather, ensuring that they are appropriate is what makes the difference in the success of a project. There are many  factors  to  consider  including  cost,  performance,  future  maintenance, traffic, access, pavement section properties, geometric constraints, and climate including shaded areas and drip lines, etc. The streets of Daly City have a wide variety of pavement conditions and user needs. There are numerous pavement rehabilitation techniques available today with new binders, new additives and polymers all of which may be applied in various layers to preserve pavement life. The figure   to the right shows a range of seals and treatments that have worked successfully for NCE’s clients in California.

Pavement  Design  Related  Geotechnical  Engineering  –  NCE’s  geotechnical engineers  understand  the  significance  of  proper  pavement  support  on competent subgrade soils to limit damaging settlement and future cracking. For example, based on field exploration
and  soil/rock  laboratory  testing,  we  are  able  to  accurately  assess  the engineering properties and the presence of subgrade soils that might be soft and exhibit pumping under vehicle loads. We develop appropriate subgrade stabilization  techniques  for  problematic  subgrade  soils  that  may  include moisture  conditioning,  lime  treatment,  geotextiles,  and/or  over‐excavation and replacement with aggregate materials.

Special  Equipment  –  NCE  can  evaluate  pavement
structural  conditions  with  deflection  testing  using  our Falling  Weight  Deflectometer  (FWD).  The  FWD  is  a specialized tool that will support the development of a more cost‐effective design for the City. The in‐ situ conditions can be quickly evaluated to determine issues such as the extent of subgrade problems or  the  presence  of  voids/unstable  soils.  Pavement  designs  for  phased  or  staged  constructions  are possible, as well as the ability to model and use new materials and technologies.

High  Quality  Deliverables  –  The  NCE  team  holds  quality  of  utmost  importance  –  not  just  because  of  our  clients’ requirements,  but  because it  is  vital  to  our  continued professional  and  commercial  viability.  NCE’s  Quality  Assurance Management Program (QAMP) reduces production costs and ensures quality engineering designs, planning documents, and  regulatory  permit  applications.  Our  focus  is  on  producing  engineering  designs,  technical  reports,  special  studies, permit applications, environmental, and construction documents that maximize project delivery, while at the same time minimize  regulatory  agency  comments  and  contractor  claims  and  change  orders.  NCE’s  QAMP  is  based  on  four principles: client satisfaction, employee participation, problem prevention, and continuous quality improvement.

The  QAMP  includes  detailed  review  of  each  environmental  and  planning  document,  technical report,  permit  application,  engineering  specification,  drawing,  and  calculation,  and  design document prior to submittal to the client, as well as providing meticulous record keeping and high standards of field documentation.

Our field technicians regularly work with our project managers and engineers during planning and design  to  perform  constructability  reviews,  regulatory  compliance  analysis,  and  provide  input  on specifications  based  on  their  experience  working  with  contractors.  Clear  and  thorough  reports,  studies,  plans,  and specifications are one of the best claims‐avoidance tools you can have and a means of minimizing regulatory scrutiny.

NCE routinely provides biddability and constructability reviews for our clients to ensure projects can be constructed as

Page 42 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 15
designed. The goal of NCE’s QAMP is to infuse quality throughout the entire project – that goal is shared by every NCE staff member. All of NCE’s projects include a QC Manager who reports directly to the Project Manager.

Relevant Project Experience
Over the past several years, NCE has developed outstanding working relationships with California clients, implementing projects similar to the City’s. Given that this project will require work within the street right‐of‐way with resurfacing and rehabilitation, NCE can offer our experience designing thousands of roads throughout California, including recently in Berkeley, Davis, Pacifica, Richmond, San Pablo, San Leandro, Berkeley, Belmont, Moraga, South San Francisco, Los Gatos, The Presidio, Sunnyvale, and Capitola. The City can be confident that NCE will provide technically innovative and cost‐ effective treatment selections, biddable and constructible design documents, and comprehensive construction support.

NCE has a proven record of success in delivering projects within the established contract budget and on‐time project submittal delivery. Table 1 below summarizes similar services and projects recently delivered to our clients.

Table 1 – NCE’s Cost Estimating Accuracy
Reference Projects
NCE has had the privilege to work with many cities and counties in Northern California, including Daly City, on roadway projects. The following pages provide examples of relevant projects that NCE has successfully delivered to our clients within the last three years. These projects exemplify our firm’s diverse experience and capabilities that we can provide Contracting Agency and Project Title  Date
Engineer’s
Estimate
($M)
Construction
Cost ($M)
City of South San Francisco 2022 West Project *  2022  $10.5  $9.5 City of Pacifica 2022/23 Pavement Resurfacing Project *  2022  $1.2  1.2 City of Pacifica North Pacifica Pedestrian Improvement Project *  2021  $0.37  $0.31 City of Davis 2021 Transportation Infrastructure Rehabilitation Program  2021  $10.9  $10.4 City of Richmond Yellow Brick Road Complete Street  2021  $7.2  $6.8 City of San Pablo Rumrill Boulevard Complete Streets Project  2021  $14.6  $15.0 City of Belmont Street Reconstruction Project  2021  $2.1  $2.1 City of Richmond Castro Ranch Road Rehabilitation Project *  2021  $3.4  $3.1 Presidio Trust Pavement Rehabilitation and Maintenance Project  2021  $4.8  $4.8 City of South San Francisco 2019/20 Surface Seal Project *  2020  $2.5  $2.2 City of South San Francisco 2020 Pavement Rehabilitation Project *  2020  $2.2  $2.2 City of South San Francisco OBAG 2 Street Rehabilitation Project *  2020  $1.2  $1.3 City of Walnut Creek Parkside and Broadway Rehabilitation Project  2020  $1.9  $1.8 Town of Moraga 2020 Pavement Rehabilitation Project *  2020  $1.5  $1.4 City of Davis 2020 Transportation Infrastructure Réhabilitation Program  2020  $4.9  $4.3 City of Berkeley Measure M Street Rehabilitation 2019  2019  $5.4  $5.2 City of Sunnyvale Pavement Rehabilitation 2019 *  2019  $1.4  $1.1 City of San Leandro Annual Street Overlay/Rehabilitation 2018/19  2019  $10.1  $10.2 City of Berkeley Measure M Street Rehabilitation 2018 *  2019  $3.9  $3.2 City of Davis 2019 Transportation Infrastructure Réhabilitation Program  2019  $1.2  $0.9 City of South San Francisco Surface Seal Project 2018 *  2018  $1.2  $1.2 City of South San Francisco Surface Seal Project 2017 *  2017  $0.92  $0.75 * Denotes projects where NCE's proposed Project Manager, Victor Lemus, has prepared Engineer's Estimate which was within 10% or less of the construction cost proposed by the lowest responsive, responsible bidder.

Page 43 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 16
to the City. Additionally, the references provided will allow the City to verify NCE’s experience and level of satisfaction of our clients. NCE proposed key staff are also noted in each project description.

Project and Client Information  Project Overview
2017 to 2022 Street Surface Seal
and Rehabilitation Projects
2022 West Highway 101
Pavement Rehabilitation Project
Agency: City of South San
Francisco
Contact: Angel Torres, PE
Phone: (650) 829‐6660
Email: [email protected]
Timeline: 2018‐Ongoing
Construction Cost: $30M (Street
Surface Seal & Rehab Projects);
$20M (West Highway 101)
NCE  has  successfully  completed  pavement  resurfacing,  rehabilitation,  and reconstruction projects for the City since 2017, that comprised of 47.7 centerline miles  of  streets  for  resurfacing  and  16.0  centerline  miles  of  streets  for rehabilitation. Every two years, the City surveys the streets and enters the data into  the  StreetSaver®  database.  This  database  assists  staff  in  determining  the pavement condition index (PCI) for each street segment and the street network overall.  NCE  assists  City  to  update  historical  maintenance  and  rehabilitation records and conduct field review to identify candidate streets for City’s annual surface  seal  and  rehabilitation  programs.  Based  on  City’s  paving  budgets  and maintenance  strategy,  NCE  has  also  utilized  StreetSaver®  database  and  field reviews to develop multi‐year work plan for the City in 2018, 2020, and 2022.

NCE  was  recently  selected  for  the  City’s  2022  West  Highway  101  Pavement Rehabilitation Project to perform project management, pavement rehabilitation design, PS&E, and bidding and construction support services. Additionally, the ambitious paving plan will treat all rehabilitation candidates in the City west of Highway 101.

NCE Key Staff: Ryan Shafer (Project Manager/Principal Engineer), Mei‐Hui Lee (Project  Manager/Senior  Engineer),  Victor  Lemus  (Co‐Project  Manager/Civil Design  Lead),  Franz  Haidinger  (QA/QC  Manager/Principal  Engineer),  James Signore  (Lead  Pavement  Engineer),  Tom  Van  Dam  (Lead  Pavement  Engineer), Sharlan Montgomery Dunn (Pavement Engineer), Paola Murillo (Staff Engineer) and  Alex  Paez  (CAD  Designer).  Subconsultants:  Mountain  Pacific  Surveys (Topographical Survey) and Psomas (Subsurface Utility Detection).

Project and Client Information  Project Overview
FY 2020/21 and FY 2021/22
Pavement Resurfacing Program
and 5‐Year Work Plan
Agency: City of Pacifica
Contact: Lisa Petersen, PE
Phone: (650) 738‐3770
Email: [email protected]
As part of its 5‐year work plan developed by NCE, the City allowed for pavement rehabilitation  and  resurfacing  to  be  designed  in  advance  of  construction  and allow for earlier bidding to obtain competitive bids. It was the City’s desire to have  resurfacing  projects  for  each  year,  grouping  and  aggregating  by neighborhoods for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing  annual  budget.  More  cost‐effective  cape  seal  or  multi‐layer  slurry seal with base repair and leveling course was applied on residential streets under poor to failed pavement condition to help City treat more streets within limited budgets. This was made possible by NCE staff making several field visits to verify existing street conditions and tailoring cost‐effective treatments to each street.

NCE had a tight deadline to submit both packages but our collaboration with the staff across all offices allowed to mobilize resources to this project and get bid documents ready for winter bidding.

Page 44 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 17
Timeline: 2018‐Ongoing
Construction Cost: $2.5M
NCE  Key  Staff:  Ryan  Shafer  (Principal),  Mei‐Hui  Lee  (Project  Manager),  Victor Lemus (Co‐Project Manager/Civil Design Lead), James Signore (Lead Pavement Engineer), Sharlan Montgomery Dunn (Pavement Engineer), and Alex Paez (CAD Designer).

Project and Client Information  Project Overview
Pavement Rehabilitation /
Maintenance, and Bikeway
Improvements
Agency: Presidio Trust of San
Francisco
Contact: Amy Marshall
Phone: (415) 317‐8459
Email:
[email protected]
Timeline: 2019‐Ongoing
Construction Cost: $4.8M
NCE  designed  the  Presidio  Trust’s  pavement  rehabilitation  and  maintenance project throughout the Presidio Trust campus including a substantial portion of the  bicycle  lane  network.  The  scope  for this  project  included  preparing  plans, specifications, and cost estimates for bidding purposes. Design elements of the project  include  pavement  design,  a  roundabout,  extensive  modification  to existing  striping  and  markings  to  introduce  class  II  and  III  bikeways  and  an advisory bike lane, roadway grading, drainage solutions and design, and design of minor concrete including bus platforms and curb and gutter. As part of this project,  NCE  introduced  cost‐effective  and  sustainable  pavement  treatment alternatives, such as cold in‐place recycling (CIR) that allows the asphalt concrete to  be  recycled  in‐place  offering  up  a  green  technology  that  recycles  existing onsite  materials,  reduces  costly  truck  trips  for  import  of  asphalt  paving materials,  and  reduces  greenhouse  gases  and  energy  usage.  The  pavement design considered a number of different factors, including medians, curb reveal, depth  to  underlying  concrete,  previous  overlays  and  fabric  materials,  AB thickness, contamination, cultural resources, and buried obstructions such as rail lines and recommended an appropriate pavement treatment. NCE also reviewed the Trust’s minor concrete specifications and details and discussed preliminarily how  improvements  could  be  made  to  reinforcement,  slab  thickness,  joint spacing, and mix design.

NCE Key Staff: Ryan Shafer (Principal/Project Manager), Victor Lemus (Project Engineer), James Signore (Pavement Engineer), and Sharlan Montgomery Dunn (Project  Engineer),  Paola  Murillo  and  Sara  Dowling  (Staff  Engineers).

Subconsultants: Mountain Pacific Surveys (Topographical Survey).

Project and Client Information  Project Overview
2018‐2021 Annual
Overlay/Rehabilitation, Pavement
Design, and PS&E
Agency: City of San Leandro
Contact: Nick Thom, PE
Phone: (510) 577‐3431
NCE  was  contracted  by  the  City  of  San  Leandro  to  prepare  construction documents  and  pavement  rehabilitation  and  reconstruction  design  for  23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement  investigation  and  design  and  preparation  of  civil  design  PS&Es  for construction.  Pavement  design  solutions  included  conventional  and  RHMA overlays, full‐depth asphalt reconstruction, full‐depth reclamation (FDR), and a pilot  project  for  cold  central  plant  recycling  on  an  arterial  street  based  on recommendations  provided  by  NCE.  Visible  drainage  issues  were  addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and Class IV bike lanes. The design of traffic calming bulbouts  were  prepared  for  two  streets  where  NCE  analyzed  vehicle  turning capabilities and impacts to surface drainage. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s Engineer’s Cost Estimate matched that of the winning

Page 45 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 18
Email: [email protected]
Timeline: 2020 and ongoing for
current design work
Construction Cost: $17M
contractor bid, indicating that NCE was able to anticipate the value of the scope of work.

NCE  Key  Staff:  Ryan  Shafer  (Principal/Project  Manager),  Mei‐Hui  Lee  (Senior Engineer),  Franz  Haidinger  (QA/QC  Manager),  Paola  Murillo  (Project Engineer/Technical Lead), James Signore (Associate/Pavement Engineer), Tom Van  Dam  (Lead  Pavement  Engineer),  and  Alex  Paez  (CAD  Designer).

Subconsultants: Mountain Pacific Surveys (Topographical Survey) and Psomas (Subsurface Utility Detection).

Project and Client Information  Project Overview
Castro Ranch Road Rehabilitation
and Complete Streets
Improvements
Agency: City of Richmond
Contact: Yader Bermudez
Phone: (510) 774‐6300
Email:

[email protected].
ca.us
Timeline: 2018‐2021
Construction Cost:  $3.1M
NCE  completed  civil  engineering,  pavement  engineering,  hydrology  and hydraulic engineering, and special environmental studies for the Castro Ranch Road  Rehabilitation  Project.  This  project  involved  a  significant  redesign  and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow  and  calming,  new  pedestrian  crossing  with  rectangular  rapid  flashing beacons,  median  landscaping,  construction  of  new  sidewalk,  replacement  of curb  ramps,  assessment  of  drainage  structures  and  improvements,  and addressing  other  roadway
deficiencies  including  subgrade
damage  at  a  retaining  wall  and
repair  of  guard  rail  systems.  NCE
developed a cost saving pavement
treatment  alternative  using  CIR
with  both  foam  and  emulsion
technologies  resulting  in  over
$500,000  in  cost  savings  over  conventional  mill  and  overlay  pavement treatments.

NCE Key Staff: Ryan Shafer (Principal/Project Manager), Franz Haidinger (QA/QC Manager/Principal  Engineer),  Victor  Lemus  (Civil  Design  Lead),  and  James Signore (Associate/Pavement Engineer).

Page 46 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | 19
3) Organization Chart
NCE Project Manager
NCE brings a collaborative and innovative problem‐solving mentality to address the technical challenges facing the City’s infrastructure‐related, day‐to‐day issues. Our key personnel have worked together on dozens of projects, including the projects  discussed  in  the  Reference  Projects  section  of  this  document.  The  single  most  important  tool  for  successful project management is clear, consistent, and cooperative communication. Our proposed Project Manager, Victor Lemus, PE, will be the single point of contact for the City and will communicate regularly with the City regarding progress of the project  (PS&E),  any  issues  that  may  affect  plan  production,  or  update  on  field  work  schedules.  Victor  has  civil  and pavement design and project management experience, including engineering projects related to complete streets, street maintenance and rehabilitation, infrastructure asset management, bike and pedestrian facility upgrades, parking lots, extensive  ADA  curb  ramp  design,  drainage,  and  utilities.  He  is  knowledgeable  of  the  technical  resources  in  the  firm, familiar  with  transportation  engineering,  understands  public  sector  clients,  and  has  authority  to  champion  resources within the firm. The years of experience working on similar projects has made Victor understand the bidding market and prepare the Engineer’s Estimate of Construction within 10% or less of the actual construction cost. He will work closely with the team and the City to bring the project to successful completion. Victor will be supported by J. Ryan Shafer, PE, GE,  Principal  of  NCE’s  Richmond  office  and  Franz  Haidinger,  PE,  as  NCE’s  Chief  Engineer  and  Quality  Assurance  and Quality Control (QA/QC) Manager.

NCE Team Structure
The  NCE  team  presented  in  Table  2,  has  the  demonstrated  experience  designing  transportation  projects,  specifically infrastructure  pavement  rehabilitation  and  maintenance  and  complete‐street  projects.  The  NCE  team  is  capable  of seamlessly conducting the City’s scope of work for this contract and are ready to begin work upon notice to proceed from the City. NCE is committed to providing the staff identified within this section. Our key staff will be available throughout this contract. In addition, all team members, including subconsultants, will be  managed as an extension of NCE.

Table 2. Proposed Project Manager
and Key Personnel

Page 47 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 20
Subconsultants
We have very carefully and intentionally identified our teaming partners to offer a combination of trusted high‐quality work  deliverables  and  experience.  NCE  will  serve  as  the  prime  consultant,  and  we  have  assembled  an  exceptionally qualified, proven team of specialized firms and individuals with whom we have worked successfully for many years:

Mountain Pacific Surveys (MPS) will provide topographical surveying services. MPS is a trusted partner of NCE and will complete topographic surveys on all street sections. MPS is a professional survey services firm  providing  boundary  surveying  and  mapping,  design  surveys,  right‐of‐way  engineering,  construction  surveys, environmental surveys, monitor surveys, and photogrammetric engineering services to the public and private sector. In addition, MPS has experience working on various city street rehabilitation projects and has been involved with numerous projects for street resurfacing as our surveyor.

Contact Information for MPS
Charles Weakley, LS, Principal, MPS, 1735 Enterprise Drive, Suite 109, Fairfield, CA 94533 Phone: (707) 425‐6234; Email: [email protected]
Psomas  will  provide  subsurface  utility  detection  services  on  all  street  sections  given  the  potential  for streets to require reconstruction or improvements in potential conflict with utilities. Psomas is a firm with noted expertise in subsurface utility engineering and locating to complete locate utilities with non‐invasive geophysical techniques such as ground penetrating radar (GPR). Psomas will also provide utility potholing in the event there are key location where critical utility facilities require greater accuracy or verification. Psomas is currently providing subsurface utility detection services throughout California for a variety of public agency clients. With 70 years of experience, Psomas is a trusted teaming partner having worked on numerous street rehabilitation and maintenance projects with NCE.

Contact Information for Psomas
Tom Pilarski, PLS, Director, Subsurface Utility Engineering, Psomas, 5 Hutton Centre Drive, Suite 300, Santa Ana, CA 92707 Phone: (714) 481‐7908; Email: [email protected]
BSK Associates (BSK) will provide geotechnical laboratory testing services on subgrade soil materials. BSK is  a  100  percent  employee‐owned  California  S  corporation  that  provides  consulting  engineering, construction observation, materials testing, special inspection, and analytical laboratory services. BSK’s team of geotechnical engineers, geologists, and support staff has the technical capability to provide creative, practical, and technologically sound recommendations within a reasonable budget. BSK is well‐equipped to provide cost‐effective investigations and recommendations for many types of engineering improvement projects, ranging from independent review of geotechnical and soils reports, geotechnical engineering investigations, repair of landslide and erosion failures, to levee improvements.

Contact Information for BSK
Tim Rodriguez, North Valley Regional Manager, BSK, 399 Lindbergh Avenue, Livermore, CA 94551 Phone: (925) 315‐3151; Email: [email protected] Staff Resumes
On the following pages we respectively provide focused resumes for each NCE key staff member in the Organization Chart to further demonstrate their qualifications and relevant projects they have supported in a similar role.

Page 48 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 21
Ryan Shafer, PE, GE
Principal‐in‐Charge
Ryan Shafer, PE, GE, is an experienced Principal and Project Manager that is highly skilled in managing interdisciplinary teams of engineers, scientists, and planners for complex  projects  requiring  civil  engineering,  geotechnical  engineering,  pavement engineering,  structural  engineering,  transportation  and  traffic  engineering, hydrology and hydraulics, coastal engineering, regulatory permits, technical studies and  resource  assessments,  and  environmental  documents.  In  addition,  he  has managed and provided civil and geotechnical engineering on a wide range of public and  private  projects,  including  vertical  development,  municipal  roads,  trails, drainage infrastructure, landfills, public transit, recreation areas and parks, industrial facilities including refineries, and waterfront structures giving him an understanding of how to work with diverse project types. His clients provide feedback that NCE is an  effective  partner  and  steward,  understanding  what  is  important  to  each community.  Additionally,  having  worked  for  many  municipal  clients  throughout California, Ryan adds value by helping cities and counties manage and maintain their streets, roads, bicycle and pedestrian facilities, and recreation parks and trails. He applies  his  expertise  in  geotechnical  and  pavement  engineering  to  infrastructure projects and paving programs from the early stages of condition surveys to providing support during construction.

Representative Projects
2017  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco, CA. Project Manager/Principal Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and  civil  design  for  rehabilitation  and  preventive  maintenance  of  48  miles  (more than 200 street sections) of City streets with a construction cost of over $14 million.

Starting in 2017 to present for the City’s Pavement Management Program NCE has provided  pavement  and  civil  design  services  for  preventive  maintenance  on  City streets  with  scrub,  slurry,  and  cape  seals  and  rehabilitation  of  City  streets  with  mill  and  overlays  as  well  as  surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility  coordination,  curb  ramp  design,  drainage  improvements,  sidewalk  replacement,  pavement  design recommendations, PS&Es, and bidding and construction support services. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Principal‐in‐Charge. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West  of  101  Pavement  Rehabilitation  Project’s  goal  is  to  perform  deferred  maintenance  west  of  101,  outside  of  the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals,  overlays  and  surface  reconstruction  as  maintenance  and  rehabilitation  strategies.  West  of  US101  there  are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP)  StreetSaver®  database  program.  NCE  is  responsible  for  project  management,  pavement  rehabilitation  design, PS&E, and bidding and construction support services.

Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. Project Manager. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector,  and  residential  streets  (5  miles).  NCE’s  scope  of  work  included  pavement  investigation  and  design  and

Education
MS, Geotechnical Engineering,
University of California,
Berkeley, 1998
BS, Geological Engineering,
Colorado School of Mines, 1996
Registrations/Certifications
Professional Engineer – Civil,
CA #62349
Professional Engineer –
Geotechnical, CA #2713
Affiliations
American Society of Civil
Engineers
American Public Works
Association
Joined NCE
2005
Years of Experience
22 years

Page 49 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 22
preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.

Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.

Pavement  Rehabilitation/Maintenance  and  Bikeway  Improvements,  Presidio  Trust  of  San  Francisco,  CA.  Project Manager. NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform.

As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐ place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.

OBAG  2  Street  Rehabilitation,  City  of  South  San  Francisco,  CA.  Project  Manager.  NCE  provided  pavement  and  civil engineering  design,  including  Caltrans  E‐76  authorization  for  construction,  utility  coordination,  pavement  and curb/gutter  condition  survey,  pavement  deflection  testing,  pavement  coring,  pavement  design  recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.

Castro  Ranch  Road  Rehabilitation  and  Complete  Streets  Improvements,  City  of  Richmond,  CA.  Principal/Project Manager.  NCE  completed  civil  engineering,  pavement  engineering,  hydrology  and  hydraulic  engineering,  and  special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the  Three  Bears  Loop,  improved  traffic  flow  and  calming,  new  pedestrian  crossing  with  rectangular  rapid  flashing beacons,  median  landscaping,  construction  of  new  sidewalk,  replacement  of  curb  ramps,  assessment  of  drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and  emulsion  technologies  resulting  in  over  $500,000  in  cost  savings  over  conventional  mill  and  overlay  pavement treatments.

Measure  M  Street  Rehabilitation  Program,  City  of  Berkeley,  CA.  Project  Manager.  NCE  implemented  the  City’s  $30 million, multi‐year street surface seal, rehabilitation and reconstruction project, one of the City’s largest projects to date.

As project manager, Ryan managed    the development of pavement design and plans, specifications and estimate for more  than  30  miles  (150  street  sections)  of  surface  seal,  street  rehabilitation,  and  reconstruction.  Complete  street elements included new bike lanes, intersection reconfigurations, new pedestrian crosswalks, storm drain improvements, and  design  of  nearly  600  curb  ramps,  including  pedestrian  safety  improvement  bulbouts.  NCE’s  pavement  design solutions offered cost savings and environmental benefits using rubberized paving products diverting tires away from landfills, use of longer lasting pavement materials, and using recycle in‐place technologies.

Yellow  Brick  Road  Complete  Streets,  City  of  Richmond,  CA.  Principal.  The  project  involves  the  design  and implementation of complete streets improvements along roadways in the    Yellow Brick Road network. Improvements include curb extensions/ bulbouts, sidewalks, ADA curb ramps, median refuges, trail crossings, Class II bicycle facilities, wayfinding  signs,  pedestrian  lighting,  landscaping,  roundabouts,  speed  tables,  raised  intersections,  rapid  flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.

Page 50 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 23
Victor Lemus, PE
Project Manager
Victor  Lemus,  PE,  is  well‐experienced  serving  as  Project  Manager  as  well  as  Civil Design Lead on large, multi‐discipline street rehabilitation and resurfacing projects, particularly  on  projects  requiring  complete  street  elements  and  complicated  ADA improvements at NCE. He is notably recognized for his ADA design expertise with curb  ramp  and  bulb‐outs  as  part  of  significant  roadway  rehabilitation  projects  on streets  throughout  Northern  California  that  often  include  difficult  grades,  utility issues,  tight  ROW  constraints,  and  in  some  cases  require  consideration  of  design exceptions. Victor is also proficient at street layout plan and profile design, striping plans, and civil design details for street improvement projects. He has extensive field data experience and has led teams of engineers on field data collection on roadway for curb and gutters, sidewalk,  digouts or base repairs, ADA curb ramps, crosswalks, striping, and drainage improvements.

Representative Projects
2016 Street Resurfacing Project, City of Daly City, CA. Staff Engineer. NCE completed pavement  and  civil  design  services  for  the  2016  Street  Resurfacing  Project.  The construction cost for this project was approximately $2 million. Victor completed the PS&E  that  consisted  of  setting  up  project  kick‐off  meetings,  coordinating  with utilities, pavement coring, field data collection, preparing civil and striping plans, cost estimation of the construction cost, as well as writing Technical Specifications for the bid items.
2017  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco, CA. Co‐Project Manager/Civil Design Lead. NCE has been providing to the City a various of pavement management services including development of a multi‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment  technologies,  and  development  of  construction  documents  for  bidding.  In  2017  to  2022  pavement management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 64 centerline miles (more than 200 sections) of City streets with a construction cost over $30 million. In addition, NCE has modified City’s Street Saver database and updated historical maintenance and rehabilitation records to perform budget analyses  and  develop  multi‐year  work  plan.  Recently,  City’s  6‐Year  Work  Plan  was  updated  based  on  City’s  budget, rehabilitation strategy and candidate streets are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget.  NCE  has  provided  pavement  and  civil  design  services  for  preventive  maintenance  on  City  streets  with  scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays and surface reconstruction. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Co‐Project Manager/Civil Design Lead. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140  centerline  miles,  comprised  of  33  arterial  miles,  39  collector  miles,  and  68  residential  miles.  The  City  utilizes  a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles.

Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.

FY  2020/21  and  FY  2021/22  Pavement  Resurfacing  Program  and  5‐Year  Work  Plan,  City  of  Pacifica,  CA.  Co‐Project Manager/Civil Design Lead. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects

Education
BS, Civil and Environmental
Engineering, University of
California, Davis, 2014
Registrations/Certifications
Professional Engineer – Civil,
CA #89769
Affiliations
Chi Epsilon
Joined NCE
2014
Years of Experience
7 years

Page 51 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 24
based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting  reflective  cracking.  As  part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and  construction support services.

OBAG  2  Street  Rehabilitation,  City  of  South  San  Francisco,  CA.  Project  Engineer.  The  City  retained  NCE  to  provide pavement  and  civil  engineering  design,  including  Caltrans  E‐76  authorization  for  construction,  utility  coordination, pavement  and  curb/gutter  condition  survey,  pavement  deflection  testing,  pavement  coring,  pavement  design recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.

Castro Ranch Road Rehabilitation and Complete Streets Improvements, City of Richmond, CA. Civil Design Lead. NCE completed  civil  engineering,  pavement  engineering,  hydrology  and  hydraulic  engineering,  and  special  environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop,  improved  traffic  flow  and  calming,  new  pedestrian  crossing  with  rectangular  rapid  flashing  beacons,  median landscaping,  construction  of  new  sidewalk,  replacement  of  curb  ramps,  assessment  of  drainage  structures  and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and emulsion technologies resulting in over $500,000 in cost savings over conventional mill and overlay pavement treatments. 2017 Berkeley Rehabilitation/ PCC Work and Surface Seal, Berkeley, CA. Staff Engineer. Measure “M” was a $30 million bond passed to accelerate street improvements in Berkeley. NCE was tasked to consider cost effective treatments that extended  paving  dollars  and  offered  recycling  or  environmental  benefits.  Victor’s  involvement  included  field  data collection, marking concrete and base repairs in the field and mapping them onto a GPS unit for import into CAD. Victor was  also  involved  in  the  civil  design  aspect  of  the  project,  most  notably  regrading  reconstruction  streets  to  ensure drainage and eliminate high street cross slopes.
2020/21  Pavement  Rehabilitation,  Town  of  Moraga,  CA.  Project  Manager/Project  Engineer.  Victor  was  the  Project Manager and Technical Lead for curb ramp design, street layout plan and profile design, striping plans, and civil design details  on  plans  for  various  streets.  The  project  includes  curb  ramp  installation  and  replacement,  storm  drain replacement, sidewalk and curb and gutter repairs, CCTV, striping, and utility location and coordination. 2019 SB1 Pavement Rehabilitation, City of Sunnyvale, CA. Project Engineer. The City of Sunnyvale sought assistance from  a  licensed  Engineering  firm  to  provide  professional  services  for  design  and  preparation  of  bid  documents  and construction  support  for  the  Pavement  Rehabilitation  2019  SB1  project.  The  scope  of  work  included  preparation  of preliminary design, design development, bid documents, and bidding/construction support for Public Works competitive bidding.  Ancillary  work  included  construction  cost  estimating,  schedule  monitoring,  preparation  of  reports  and recommendations, and project management. Victor was responsible for field data collection, coordination with utilities and VTA, pavement design review, PS&E production, bidding and construction support. 2015 Street Surface Seal, City of Berkeley, CA. Staff Engineer. Victor performed a street seal and striping inventory, field survey of curb ramps, assisted with striping plans and prepared design plans, including vicinity maps and details of curb ramps to adjust to latest ADA requirements, for a surface seal program on 27 streets in the City of Berkeley. The surface seal program included slurry seals and rubberized cape seals with an estimated construction value of $2 million.

Yellow Brick Road Complete Streets, City of Richmond, CA. Project Engineer and E76 Coordinator. Improvements include curb extensions/bulbouts, sidewalks, ADA curb ramps, median refuges, trail crossings, Class II bicycle facilities, wayfinding signs, pedestrian lighting, landscaping, roundabouts, speed tables, raised intersections, rapid flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.

Page 52 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 25
Franz Haidinger, PE
Quality Assurance and Quality Control (QA/QC) Manager
Franz  Haidinger,  PE,  is  a  Principal  and  Chief  Engineer  at  NCE  responsible  for overseeing, managing, and developing designs and PS&Es for roadway improvement projects and implements sustainable technologies. In his role at NCE, he enjoys the opportunity  to  improve  and  protect  the  built  environment,  whether  it’s implementing  sustainable  pavement  technologies,  creating  storm  water  pollution prevention  plans,  assessing  drinking  water  sources,  or  remediating  contaminated soil. His clients value his ability to understand their needs, evaluate alternatives and determine  the  most  appropriate  solutions.  According  to  Sean  Rose,  Public  Works Director of the Town of Woodside, “Franz is a detail‐oriented engineer that does a very thorough job preparing plans and specifications. He did a great job listening to our  needs  and  specific  comments  and  provided  thorough  and  concise  responses.

Ultimately, he provided a high‐quality design, and he was a pleasure to work with.” Representative Projects
2017  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco, CA. QA/QC Manager/Principal Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and  civil  design  for  rehabilitation  and  preventive  maintenance  of  48  miles  (more than 200 street sections) of City streets with a construction cost of over $14 million.

Starting in 2017 to present for the City’s Pavement Management Program NCE has provided  pavement  and  civil  design  services  for  preventive  maintenance  on  City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design  services  included  pavement  coring,  curb/gutter  replacement,  utility coordination,  curb  ramp  design,  drainage  improvements,  sidewalk  replacement, pavement design recommendations, PS&Es, and bidding and construction support services.

OBAG  2  Street  Rehabilitation  ,  City  of  South  San  Francisco,  CA.  QA/QC  Manager.  The  City  retained  NCE  to  provide pavement  and  civil  engineering  design,  including  Caltrans  E‐76  authorization  for  construction,  utility  coordination, pavement  and  curb/gutter  condition  survey,  pavement  deflection  testing,  pavement  coring,  pavement  design recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.
2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of South San  Francisco,  CA. QA/QC  Manager.  NCE  is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West  of  101  Pavement  Rehabilitation  Project’s  goal  is  to  perform  deferred  maintenance  west  of  101,  outside  of  the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals,  overlays  and  surface  reconstruction  as  maintenance  and  rehabilitation  strategies.  West  of  US101  there  are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP)  StreetSaver®  database  program.  NCE  is  responsible  for  project  management,  pavement  rehabilitation  design, PS&E, and bidding and construction support services.

Education
Diplom‐Ingenieur (Equivalent of
MS degree), Civil Engineering,
University of Natural Resources
and Life Sciences, Vienna,
Austria, 1997
Registrations/Certifications
Professional Engineer – Civil,
CA, #64725
Affiliations
American Society of Civil
Engineers
American Public Works
Association
Joined NCE
2004
Years of Experience
22 years

Page 53 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 26
Civil Design and Measure K Paving Program, Town of Moraga, CA. Project Manager and Lead Civil Engineer. Responsible for the preparation of construction documents to reconstruct three streets (totaling approximately 200,000 square feet) in  the  Town  of  Moraga.  FDR  was  chosen  as  the  reconstruction  alternative  based  on  a  comprehensive  pavement  and subgrade investigation. The design plans included grading plans and profiles and included drainage improvements and the design and construction of a retaining wall (soldier piles and lagging) to protect an eroding storm drain culvert outfall.

The project included comprehensive regulatory compliance and permitting services, as well as coordination with adjacent property owners (St. Mary’s College) as some of the design elements were sited in biological sensitive areas. Key to the project success was the tight collaboration with staff responsible for the permitting and regulatory compliance tasks, incorporation of permitting requirements and mitigation measures into the design documents, and communication with Town staff and stakeholders. After passing a 1 percent sales tax in 2012 to raise approximately $8 million for streets and roads, Measure K, the Town selected NCE for a three‐year, on‐call contract to provide a variety of pavement‐related services for this significant community project.

Measure M Street Rehabilitation Program, City of Berkeley, CA. Technical Lead/QC Manager. NCE developed the PS&Es and pavement designs. Phases 1 and 2 consisted of 54 rehabilitation and reconstruction street sections and 48 surface seal street sections, traffic control plans, replacing/retrofitting nearly 450 curb ramps, replacement of curb/gutter, storm drains, bike/pedestrian improvements, and intersection reconstruction. Design was completed on a very tight timeframe.

Transportation Infrastructure and Rehabilitation Program (TIRP), City of Davis, CA. Project Manager. Responsible for the preparation of construction documents for the rehabilitation and reconstruction of several residential streets and arterials in the City of Davis. The project includes the reconstruction of a mile of bike paths currently paved with asphalt concrete to PCC pavement. This project is a continuation of a three‐year contract with the City of Davis to improve its streets and bike path network. The work includes topographic surveying, pavement condition analysis, pavement coring and deflection testing, quantity take offs for utility covers, striping, ADA related upgrades, and curb/gutter, and sidewalk repairs. The project was divided into three bid packages, i.e., slurry seal package, road rehabilitation/reconstruction, and bike path reconstruction to attract more contractors and minimize contractor mark‐ups on subcontractors.

Castro  Ranch  Road  Rehabilitation  and  Complete  Streets  Improvements,  City  of  Richmond,  CA.  QA/QC  Manager/ Principal Engineer. NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special  environmental  studies  for  the  Castro  Ranch  Road  Rehabilitation  Project.  This  project  involved  a  significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link  along  the  Three  Bears  Loop,  improved  traffic  flow  and  calming,  new  pedestrian  crossing  with  rectangular  rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and  emulsion  technologies  resulting  in  over  $500,000  in  cost  savings  over  conventional  mill  and  overlay  pavement treatments.

Rumrill Boulevard Complete Streets and Green Infrastructure, City of San Pablo, CA. QA/QC Manager. NCE is designing an approximately $15 million in construction value, 2.5‐mile‐long complete streets project along Rumrill Boulevard. This is a Community‐based design process focused on transforming the street into a safe and friendly place for people and business by improving conditions for walking, bicycling, and transit. This street corridor will receive a road diet and to add Class IV bikeways in both directions of travel. Additional key project elements include landscape buffers, widened bus  stop  landings,  increasing  parking,  and  video  detection  at  traffic  signals  for  vehicles  and  bicycles.  In  addition,  the project will include LID design and bioretention basins, landscaping improvements, curb extensions/bulbouts, sidewalk widening, crosswalk improvements with rectangular rapid flashing beacons, median refuges bus stop shelters, expanded street lighting, ADA concrete and roadway improvements (curb ramps, sidewalks, driveways, medians, and regrading pedestrian  roadway  crossings),  storm  drainage  improvements, trail crossings,  wayfinding  signs,  pedestrian  and  street lighting.

Yellow  Brick  Road  Complete  Streets,  City  of  Richmond,  CA.  Lead  Civil  Engineer.  Improvements  include  curb extensions/bulbouts,  sidewalks,  ADA  curb  ramps,  median  refuges,  trail  crossings,  Class  II  bicycle  facilities,  wayfinding signs, pedestrian lighting, landscaping, roundabouts, speed tables, raised intersections, rapid flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.

Page 54 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 27
Mei‐Hui Lee, PhD, PE
Project Management Program Specialist
Dr. Mei‐Hui Lee has a PhD in civil and pavement engineering and over twelve years of extensive experience in pavement design, evaluation and maintenance projects.

Currently,  Mei‐Hui  serves  as  Project  Manager  and  Senior  Engineer  for  various pavement and civil design and pavement management projects at NCE. Her clients include  the  Counties  of  Siskiyou,  Mendocino,  Lake,  Trinity,  Mariposa  and Sacramento  as  well  as  multiple  cities  including  South  San  Francisco,  Pacifica, Belmont  Sacramento,  Davis,  Stockton,  Elk  Grove,  Lincoln,  and  Folsom.  Mei‐Hui  is certified by the MTC inspector certification testing program. She was also involved in trench cut study for City of Sacramento and Pacifica.

Representative Projects
2017  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco, CA. Project Manager/Senior Engineer. NCE has been providing to the City a various of pavement management services including development of a multi‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating  alternative  pavement  treatment  technologies,  and  development  of construction  documents  for  bidding.  In  2017  to  2021  pavement  management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 48 centerline miles (more than 200 sections) of City streets with a construction cost over $14 million.

In  addition,  NCE  has  modified  City’s  Street  Saver  database  and  updated  historical maintenance  and  rehabilitation  records  to  perform  budget  analyses  and  develop multi‐year work plan. Recently, City’s 6‐Year Work Plan was updated based on City’s budget, rehabilitation strategy and candidate streets are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget.  NCE  has  provided  pavement  and  civil  design  services  for  preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. 2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San Francisco, CA. Project Manager. NCE is providing engineering and design services to facilitate  a  rehabilitation  project  of  all  eligible  streets  west  of  101.  The  2022  West  of  101  Pavement  Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data  into  the  South  San  Francisco  Pavement  Management  Program  (PMP)  StreetSaver®  database  program.  NCE  is responsible  for  project  management,  pavement  rehabilitation  design,  PS&E,  and  bidding  and  construction  support services.

FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Project Manager. NCE has developed 5‐Year work plan for the City with surface seal  and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments  to  finalize  the  work  plan.  NCE  then  scheduled  field  calibration  meeting  with  City  staff  to  discuss  various surface  seal  applications  and  base  repair  criteria.  Cost  effective  cape  seal  with  leveling  courses  were  designed  on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As

Education
PhD, Civil Engineering, National
Taiwan University, Taiwan,
2009
MS, Civil Engineering, Columbia
University, New York, 2012
BS, Civil Engineering, National
Taiwan University, Taiwan,
2002
Registrations/Certifications
Professional Engineer – Civil,
CA #87635
MTC StreetSaver® Rater
Certification Program
Affiliations
American Society of Civil
Engineers
American Concrete Pavement
Association
Joined NCE
2014
Years of Experience
12 years

Page 55 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 28
part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included  pavement  coring,  curb/gutter replacement,  utility  coordination,  curb  ramp  design,  drainage  improvements,  pavement  design  recommendations, PS&Es, and bidding and construction support services.

Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. Senior Engineer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector,  and  residential  streets  (5  miles).  NCE’s  scope  of  work  included  pavement  investigation  and  design  and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.

Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate. 2015  to  2020  Transportation  Infrastructure  Rehabilitation  Capital  Improvement  Project,  City  of  Davis,  CA.  Project Engineer/Senior Engineer. This project involved producing pavement rehabilitations for 698 street sections in Davis from 2015  to  2020  with  a  construction  cost  over  $18.5  million.  The  project  involved  non‐destructive  pavement  deflection testing, pavement coring, pavement condition surveys and base repair location identification. Following the collection of the  field  data,  rehabilitative  recommendations  were  made  based  on  each  street  segment’s  structural  integrity  and performance. Recommendations for each section were summarized in a pavement design report and submitted to the City. In addition, NCE has updated City’s pavement management program in 2015 and 2018. 3‐Year work plan for City’s capital improvement project was developed in 2017 with annual paving budget $3.5 million per year. 2015 Street Reconstruction Project, Town of Moraga, CA. Project Engineer. In order to effectively spend funds to be collected  from  a  recent  sales  tax  measure  passed  by  Town  residents,  NCE  worked  with  Town  of  Moraga  to  plan  and prepare for the aggressive and cost‐effective treatments for the three phase projects. In phase III, a total 13 streets of residential  and  collector  streets  are  designated  for  reconstruction  or  overlay.  Mei‐Hui  served  as  Project  Engineer  in preparation of the field data collection, including identifying localized pavement repairs and curb and gutter repairs and pavement design analysis. Pavement reconstruction recommendations were summarized in the report and submitted to the Town.
2015 Street Resurfacing Program, City of San Bruno, CA. Project Engineer. This project included 16 sections in the City’s pavement rehabilitation design and seal program. Mei‐Hui served as Project Engineer in preparation of the field data collection, including identifying localized pavement coring plan, FWD testing, pavement condition survey and pavement design  analysis.  She  also  conducted  budgetary  analysis  on  City’s  StreetSaver®  database  by  different  maintenance strategies and funding level. Summary of analysis result were submitted to the City.

Main Street Rehabilitation, City of Oakley, CA. Project Engineer. This project included rehabilitation recommendations for  a  one‐mile  stretch  of  Main  Street  in  Oakley.  The  project  involved  non‐destructive  pavement  deflection  testing, pavement  coring,  pavement  condition  surveys  and  base  repair  location  identification,  all  reviewed  by  Mei‐Hui.  The subject  section  of  Main  Street  last  received  an  overlay  about  20  years  ago  and  the  only  maintenance  that  had  been completed since was the repair of the worst base failure areas in 2009 by Caltrans prior to being relinquished to City. The street  asphalt  surface  is  visibly  aged  and  in  need  of  pavement  rehabilitation  to  address  low  to  medium  severity longitudinal and transverse cracking, as well as block cracking and potentially accommodate increased traffic from future development. Recommended treatment is thin mill and overlay with rubber hot mix asphalt to control reflecting cracking.

Pavement Management System Updates, Various Cities and Counties. Project Engineer. Mei‐Hui has been involved with updating Pavement Management Systems (PMS) for many Cities and Counties throughout California. She is responsible for  the  analysis  and  quality  control  of  pavement  distress  data  collection,  updating  maintenance  and  rehabilitation decision trees and the treatment unit costs, and the development of budget scenarios and summary reports. She has developed  cost‐effective  maintenance  treatments  and  strategies,  prepared  custom  multiple‐year  detailed  street maintenance plans and budget option reports, and linked GIS maps with management sections in the PMS database.

Page 56 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 29
James Signore, PhD, PE
Lead Pavement Engineer (Asphalt)
Dr. James Signore, PE, serves as a Principal Pavement Engineer at NCE. He specializes in  pavement  design  and  evaluation,  rehabilitation  and  maintenance,  materials assessment, and training. He has experience in designing pavements for many local agencies, Caltrans and for heavy vehicle loading applications at airfields and ports.

He has spent years researching all types of pavement materials, having directed a state‐of‐the‐art  AMRL  certified  and  Superpave  mix  design  equipped  research laboratory  and  is  well  versed  in  state  and  local  pavement  practices  and specifications.  James  has  taught  NHI’s  and  ASCE’s  “Techniques  for  Pavement Rehabilitation”  (including  best  practices  for  utility  cuts  and  patches)  seminars  to practicing  engineers  for  20  years.  He  taught  graduate  courses  in  pavement engineering at San Jose State University and many of his former students are civil engineers at local agencies. He uses his practical and research experience, technical knowledge and teaching skills to develop an understanding of client needs and the creation  of  design  and  rehabilitation  strategies  that  offer  the  client  agency  the leading‐edge in methods and materials for their pavements.

Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Lead Pavement Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐year Paving Work  Plan,  updating  the  City’s  maintenance  and  rehabilitation  decision  tree, evaluating  alternative  pavement  treatment  technologies,  and  development  of construction documents for bidding. To date we have developed pavement design and  civil  design  for  rehabilitation  and  preventive  maintenance  of  48  miles  (more than 200 street sections) of City streets with a construction cost of over $14 million.

Starting in 2017 to present for the City’s Pavement Management Program NCE has provided  pavement  and  civil  design  services  for  preventive  maintenance  on  City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design  services  included  pavement  coring,  curb/gutter  replacement,  utility coordination,  curb  ramp  design,  drainage  improvements,  sidewalk  replacement, pavement design recommendations, PS&Es, and bidding and construction support services.
2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San Francisco,  CA.  Lead  Pavement  Engineer.  NCE  is  providing  engineering  and  design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals,  overlays  and  surface  reconstruction  as  maintenance  and  rehabilitation  strategies.  West  of  US101  there  are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP)  StreetSaver®  database  program.  NCE  is  responsible  for  project  management,  pavement  rehabilitation  design, PS&E, and bidding and construction support services.

OBAG 2 Street Rehabilitation, City of South San Francisco, CA. Pavement Engineer. The City retained NCE to provide pavement  and  civil  engineering  design,  including  Caltrans  E‐76  authorization  for  construction,  utility  coordination, pavement  and  curb/gutter  condition  survey,  pavement  deflection  testing,  pavement  coring,  pavement  design

Education
PhD, Civil Engineering,
University of Illinois, Urbana‐
Champaign, 1998
MS, Civil Engineering,
University of Illinois – Urbana‐
Champaign, 1994
BS, Electrical Engineering,
Clarkson University, 1985
Registrations/Certifications
Professional Engineer – Civil,
CA, #62647
Affiliations
TRB Committee AFD70,
Pavement Rehabilitation
TRB Committee AFD70‐1,
Pavement Interlayer Systems
ASCE Airfield Pavement
Committee
FAA Pavement Technical
Working Group
American Society of Civil
Engineers
Joined NCE
1999‐2001, 2014
Years of Experience
25 years

Page 57 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 30
recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.

Annual  Overlay/Rehabilitation,  2017‐2018  and  2020‐2021  Pavement  Design  and  PS&E,  City  of  San  Leandro,  CA.

Associate/Pavement Engineer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized  hot  mix  asphalt  overlays,  full‐depth  asphalt  reconstruction,  FDR  in  lieu  of  more  expensive  conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE. Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II  and  class  IV  bike  lanes.  NCE  submitted  and  managed  three  encroachment  permit  applications  with  Caltrans  as  the project  encroached  on  three  state  routes.  NCE’s  engineer’s  estimate  matched  that  of  the  winning  contractor  bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.

Castro  Ranch  Road  Rehabilitation  and  Complete  Streets  Improvements,  City  of  Richmond,  CA.  Associate/Pavement Engineer.  NCE  completed  civil  engineering,  pavement  engineering,  hydrology  and  hydraulic  engineering,  and  special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the  Three  Bears  Loop,  improved  traffic  flow  and  calming,  new  pedestrian  crossing  with  rectangular  rapid  flashing beacons,  median  landscaping,  construction  of  new  sidewalk,  replacement  of  curb  ramps,  assessment  of  drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and  emulsion  technologies  resulting  in  over  $500,000  in  cost  savings  over  conventional  mill  and  overlay  pavement treatments.

FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Lead Pavement Engineer. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments  to  finalize  the  work  plan.  NCE  then  scheduled  field  calibration  meeting  with  City  staff  to  discuss  various surface  seal  applications  and  base  repair  criteria.  Cost  effective  cape  seal  with  leveling  courses  were  designed  on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included  pavement  coring,  curb/gutter replacement,  utility  coordination,  curb  ramp  design,  drainage  improvements,  pavement  design  recommendations, PS&Es, and bidding and construction support services.

Measure M Street Rehabilitation Program, City of Berkeley, CA. Lead Pavement Engineer. James is responsible for the development of pavement design and PS&E for the first phase of the project, which consists of 39 rehabilitation and reconstruction  street  sections  and  24  surface  seal  street  sections,  replacing/retrofitting  nearly  300  curb  ramps, replacement of curb/gutter, intersection reconstruction, bike and pedestrian improvements, and traffic control plans.

Pavement Guidance, Numerous Bay Area Cities, CA. Lead Pavement Engineer. James provides technical support and guidance on various pavement related issues from design to materials to specifications for many clients in the Bay Area.

On‐Call  Pavement  Engineering,  California  Department  of  Transportation,  Statewide,  CA.  Project  Manager.  James manages  the  pavement  on‐call  contract  with  Caltrans  and  is  responsible  for  all  contractual  and  project  management activities.  Major  task  orders  emphasize  asphalt  and  concrete  pavement  performance  and  evaluation  for  all  types  of pavement issues such as a comparison of ARHM and conventional HMA performance, HMA smoothness specifications, and polyester inlay materials evaluation. He provided technical guidance on the selection and testing of joint filler and spall  repair  materials  and  acted  as  a  construction  methods  assessor  on  the  installation  of  precast  concrete  slabs.  He wrote,  reviewed,  or  edited  numerous  interim  and  final  reports  including  those  dealing  with  continuously  reinforced concrete, rapid set concrete, concrete inlay hardeners, and concrete flexural strength.

Page 58 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 31
Thomas (Tom) Van Dam, PhD, PE, FACI, LEED AP –
Lead Pavement Engineer (Concrete)
In  the  rapidly  evolving  field  of  civil  engineering,  sustainability  is  increasingly important.  Dr.  Tom  Van  Dam  is  leading  the  way  by  working  with  the  Federal Highway  Administration  to  guide  more  sustainable  pavement  practices  and applying  his  expertise  on  a  variety  of  projects.  One  of  NCE’s  five  pavement professionals with a PhD, Tom is proud of the level of expertise that exists within the  firm.  He  enjoys  working  with  clients  and  the  public  and  can  effectively communicate the importance and applicability of highly technical information. He feels  that  NCE’s  clients  “know  they  can  rely  on  us  to  bring  them  the  latest technological knowledge as it relates to pavements and pavement materials.” Tom  brings  a  range  of  expertise  to  his  projects.  He  has  authored  more  than  75 publications and has given more than 100 presentations on pavements, concrete materials and sustainability. An active researcher, he has led projects for agencies, foundations, departments of transportations and private entities. He has also been a  professor,  Director  of  the  USDOT‐funded  University  Transportation  Center  for Materials in Sustainable Transportation Infrastructure and Director of the Michigan DOT Transportation Materials Research Center.

Representative Projects
2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San Francisco, CA. Lead Pavement Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022  West  of  101  Pavement  Rehabilitation  Project’s  goal  is  to  perform  deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes  a  program  of  slurry  seals,  overlays  and  surface  reconstruction  as maintenance and rehabilitation strategies. West of US101 there are approximately 123  centerline  miles,  comprised  of  23  arterial  miles,  35  collector  miles,  and  65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database  program.  NCE  is  responsible  for  project  management,  pavement rehabilitation design, PS&E, and bidding and construction support services.

Pavement Engineering On‐Call Services, San Francisco International Airport, City and  County  of  San  Francisco,  CA.  Forensic  Evaluator.  As  the  Airport’s  On‐Call Pavement Consultant, NCE has multiple responsibilities, including maintaining the MicroPAVER®  APMS  including  automated  distress  surveys,  determining  the ACN/PCN for all runways and taxiways, conducting numerous forensic analyses to investigate development of distress on airside  pavements,  developing  construction  guidelines  for  long‐lasting  longitudinal  joints  for  asphalt  pavements  and conducting pavement designs for runway rehabilitation and taxiway construction. Tom has provided technical support throughout this project, guiding the forensic evaluations and reviewing pavement design reports.

On‐Call Pavement Engineering, Statewide, Caltrans, CA. Subject Matter Expert. This is a multi‐year on‐call contract to provide technical solutions and assist with implementing new strategies and policies that will improve the State’s highway network. Key elements include sustainability, forensics, design tools, performance modeling, data analysis, and asphalt and concrete materials.

Almond  Grove  District  Street  Reconstruction,  Town  of  Los  Gatos,  CA.  Pavement  Engineer.  The  Town  of  Los  Gatos contracted NCE to prepare pavement design and PS&E to replace 100‐year‐old concrete streets in the historic Almond

Education
PhD, Civil Engineering,
University of Illinois, Urbana,
1995
MS, Civil Engineering,
University of Illinois, Urbana,
1986
BS, Civil Engineering, University
of Illinois, Urbana, 1984
Registrations/Certifications
Professional Engineer – Civil,
NV #23424
LEED Accredited Professional
Affiliations
American Concrete Institute
American Society of Civil
Engineers
Transportation Research Board
International Society of
Concrete Pavements
American Concrete Institute
Delmar L. Bloem Distinguished
Service Award (2018)
Joined NCE
2013
Years of Experience
35 years

Page 59 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 32
Grove District. The purpose of the project was to address the deteriorated PCC pavements and ADA compliance issues, while preserving the historical and cultural identity of the neighborhood. The concept design phase for this high‐profile community  project  included  evaluation  of  complete  streets  principles,  including  street  design,  typical  sections, intersection design, stormwater management, and surface treatment concepts, for incorporation into the project. This project was highly visible and required continued community outreach and consideration of construction impacts due to the highly visible nature, public expectations, historical aspects, and potential impacts to parking and home access.

Measure M Street Rehabilitation, City of Berkeley, CA. Pavement Engineer. NCE implemented the City’s $30 million, multi‐year street surface seal, rehabilitation and reconstruction project, one of the City’s largest projects to date. The project included the development of pavement design and plans, specifications and estimate for more than 30 miles (150 street sections) of surface seal, street rehabilitation, and reconstruction. Complete street elements included new bike lanes, intersection reconfigurations, new pedestrian cross‐walks, storm drain improvements, and design of nearly 600 curb ramps, including pedestrian safety improvement bulbouts. NCE’s pavement design solutions offered cost savings and environmental benefits using rubberized paving products diverting tires away from landfills, use of longer lasting pavement materials, and using recycle in‐place technologies.

Prater Way and El Rancho Drive Resurfacing, Regional Transportation Commission of Washoe County, NV. Pavement Engineer.  The  project  consisted  of  pavement  resurfacing  on  Prater  Way  and  a  short  section  of  El  Rancho  Drive.  NCE investigated the use of a durable thin lift bonded Portland Cement Concrete (PCC) overlay on the El Rancho Drive section.

NCE performed hot mix asphalt concrete (HMAC) and Portland Cement Concrete (PCC) pavement analysis and design; plan, specification and cost estimate development and provided construction management and inspection.

Sustainable  Pavements  Program,  Federal  Highway  Administration  (FHWA).  Co‐Principal  Investigator.  This  ten‐year (Phase I and Phase II), multi‐task order IDIQ contract issued by the FHWA to promote the sustainability of pavements is a  major  initiative  with  the  overarching  goal  of  advancing  the  knowledge  and  implementation  of  sustainability considerations in pavements and pavement materials. The Sustainable Pavements Technical Working Group (SPTWG) is comprised  of  20  representatives  from  key  stakeholder  groups,  including  federal  and  state  government,  academia, industry  and  research  institutions.  The  SPTWG  provides  technical  input  to  the  FHWA—specific   to  sustainability  and environmental aspects of pavements and materials—and  to serve as a forum for information sharing and exchange. The Sustainable Pavements Reference Manual (http://www.fhwa.dot.gov/pavement/sustainability/hif15002/hif15002.pdf), of which Tom is the first author, is a 450‐page manual on implementation strategies to improve pavement sustainability.

Project NEON (I‐15/US 95 Reconstruction), Nevada Department of Transportation, NV. Pavement Engineer. NCE is the Pavement  Designer  for  the  Design‐Build  consortium  that  has  been  awarded  a  $560  million  contract  by  the  Nevada Department of Transportation (NDOT) to construct Project NEON. This project is in downtown Las Vegas and extends 3.7 miles along I‐15 from Sahara Avenue to the US95/I‐15 Interchange. Tom leads the pavement design team responsible for the evaluation of the interstate pavement designs, design of all local roadways and providing broad technical support on all pavement issues including subgrade and materials.

Implementation  of  Best  Practices  for  Concrete  Pavements,  Federal  Highway  Administration  (FHWA).  Co‐Principal Investigator.  This  is  a  multi‐year,  multi‐task  order  IDIQ  contract  issued  by  the  FHWA  to  promote  concrete  pavement technology.  Thomas  is  one  of  the  lead  authors  on  the  creation  of  the  Concrete  Pavement  Notebook.  The  notebook addresses all elements of concrete pavement materials, design, construction, preservation, rehabilitation and is to be a compilation of updated current FHWA technical briefs, technical advisories and new stand‐alone documents that are to facilitate implementation of best practices by FHWA and State DOT engineers. The entire notebook will also be web‐ based for easy access.

Technology Transfer of Concrete Pavement Technologies, Federal Highway Administration (FHWA). Technical Expert.

This  is  a  multi‐year,  multi‐task  order  IDIQ  contract  issued  by  the  FHWA  to  support  the  National  Center  for  Concrete Pavement Technology. Thomas has multiple roles in this project including instructor for concrete overlay and concrete preservation workshops, preparation of commentary to support the development of an AASHTO Guide Document on Performance Engineered Concrete Mixtures, development of a new manual of concrete pavement distress, revision of the Integrate Materials and Construction Practices for Concrete Pavement: A State‐of‐the‐Practice Manual, and other outreach activities.

Page 60 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 33
Sharlan Montgomery Dunn, PhD, PE
Pavement Engineer
Dr.  Sharlan  Montgomery  Dunn  holds  a  PhD  in  civil  engineering  from  Purdue University. She has eight years of experience in pavement design, management, and research  work.  After  joining  NCE  in  2018,  she  has  enjoyed  working  on  pavement design  and  pavement  management  projects  for  local  agencies  and  airports throughout  California.  She  currently  serves  as  a  Project  Engineer  for  various pavement management, maintenance, rehabilitation, design, and planning projects.

Sharlan  is  also  MTC  certified  to  perform  pavement  condition  surveys  and  is  the instructor for several of MTC’s StreetSaver® User Week workshops.

Representative Projects
2018  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco, CA. Pavement Engineer. NCE has been providing to the City a full range of pavement  management  services  including  development  of  a  5‐year  Paving  Work Plan,  updating  the  City’s  maintenance  and  rehabilitation  decision  tree,  evaluating alternative  pavement  treatment  technologies,  and  development  of  construction documents for bidding. To date we have developed pavement design and civil design for  rehabilitation  and  preventive  maintenance  of  48  miles  (more  than  200  street sections) of City streets with a construction cost of over $14 million. Starting in 2017 to  present  for  the  City’s  Pavement  Management  Program  NCE  has  provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as  well  as  surface  reconstruction.  NCE  civil  and  pavement  engineering  design services  included  pavement  coring,  curb/gutter  replacement,  utility  coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services. 2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San Francisco, CA. Pavement Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west  of  101,  outside  of  the  annual  surface  seal  program.  The  City  is  responsible  for  the  maintenance  and  repair  of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of  US101  there  are  approximately  123  centerline  miles,  comprised  of  23  arterial  miles,  35  collector  miles,  and  65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.

Pavement  Rehabilitation/  Maintenance  and  Bikeway  Improvements,  Presidio  Trust  of  San  Francisco,  CA.  Project Engineer. NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform.

As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐ place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.

Education
PhD, Civil Engineering, Purdue
University, 2018
MS, Civil Engineering, Brigham
Young University, 2014
BS, Civil Engineering, Brigham
Young University, 2011
Registrations/Certifications
Professional Engineer – Civil,
CA #93268
MTC StreetSaver Rater
Certification Program
Affiliations
American Society of Civil
Engineers
Joined NCE
2018
Years of Experience
8 years

Page 61 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 34
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Pavement Engineer. NCE has developed 5‐ Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments  to  finalize  the  work  plan.  NCE  then  scheduled  field  calibration  meeting  with  City  staff  to  discuss  various surface  seal  applications  and  base  repair  criteria.  Cost  effective  cape  seal  with  leveling  courses  were  designed  on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included  pavement  coring,  curb/gutter replacement,  utility  coordination,  curb  ramp  design,  drainage  improvements,  pavement  design  recommendations, PS&Es, and bidding and construction support services.

San  Francisco  International  Airport  On‐Call  Pavement  Engineering,  City  and  County  of  San  Francisco,  CA.  Project Engineer. Sharlan has been involved in a variety of field investigation and design work at the San Francisco Airport. These include pavement evaluation of Runway 1L‐19R, and Boarding Areas A and B, and evaluation and design of Taxiway B 3 and 4. These projects have involved a variety of destructive and non‐destructive testing (such as coring, deflection testing, and ground penetrating radar testing) and complex analyses and design using back calculation and FAA design software.

Valley View Avenue Rehabilitation Project, City of La Mirada, CA. Project Engineer. NCE provided pavement evaluation and  design  services  Valley  View  Avenue,  a  highly  traveled  commercial  corridor  nearly  a  mile  long  with  heavily deteriorated  pavement.  A  pavement  condition  survey  was  conducted  with  distresses  identified  along  with  areas  for potential  base  repairs.  Coring,  sampling  and  laboratory  testing  was  performed,  and  a  pavement  design  and  soils investigation report were prepared and included potential treatments with a focus on sustainable treatments and cost saving measures. Technical specifications were provided.

Broadway and Parkside Rehabilitation, City of Walnut Creek, CA. Project Engineer. This project included rehabilitation recommendations for approximately two miles of arterial streets in downtown Walnut Creek that exhibited a variety of distresses  ranging  from  minor  to  severe  failure  mechanisms.  Pavement  design  tasks  included  pavement  condition surveys, coring, non‐destructive pavement deflection testing, design, and base repair location identification. NCE also provided  civil  design  services  for  these  street  sections.  Based  on  structural  analyses  and  constructability  issues,  the recommended treatments included primarily traditional mill and overlay with base repairs with some portions of surface reconstruction.

Laurel Road Resurfacing, City of Oakley, CA. Project Engineer. NCE provided engineering services for a mile‐long section of Laurel Road between O’Hara Avenue and Empire Avenue. Laurel Road is a 4‐lane arterial street that serves as a key connector  to  Highway  4  and  provides  access  to  neighborhoods  as  well  as  an  elementary  school.  The  street  has experienced areas of fatigue cracking and roughness over the past decade. The current pavement section is inadequate to structurally support the current and expected growth in truck traffic as nearby areas will be further developed. As the pavement lead on this project, Sharlan performed pavement evaluation, testing, and pavement design for this portion of Laurel Road. Several rehabilitation options were presented to the city based on mechanistic empirical as well as Caltrans Highway designs. Ultimately, the city and NCE determined that a surface reconstruction with RHMA as the surface level would be the most cost‐effective and appropriate method for increasing the structural capacity of Laurel Road.

Pavement Management Update and Transportation Infrastructure and Rehabilitation Program (TRIP), City of Davis, CA.  Project  Engineer.  In  addition  to  updating  the  pavement  management  program  for  the  city,  Sharlan  has  been responsible  for  the  pavement  design  of  several  residential  and  arterial  streets  as  well  as  bike  paths.  This  three‐year contract with the city includes performing pavement management, pavement design, and civil design services from 2018‐ 2021. Sharlan was involved in and managed many of the following design tasks: pavement condition surveys, coring, non‐ destructive pavement deflection testing, laboratory material evaluation, design, and base repair location identification.

The pavement design projects for each year are divided into separate bid packages for slurry seals, and rehabilitation and reconstruction to attract more contractors and minimize contractor mark‐ups on sub‐contractors.

Pavement Management System Development and Updates , Various Cities and Counties, CA. Project Engineer. Sharlan has  been  involved  in  developing  and  updating  Pavement  Management  System  (PMS)  plans  for  cities  and  counties throughout California. She has been responsible for pavement distress data collection, analysis, and QC; M&R decision tree development with treatment unit cost estimates; budget scenario analyses; report  preparation; and presentations.

Page 62 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 35
Paola Murillo
Staff Engineer
Paola Murillo has been involved in numerous civil design projects for rehabilitation and reconstruction street programs that include field data collection, base repairs, roadway striping design, new curb ramps, curb and gutter repairs, sidewalk repairs, and bike and pedestrian improvements. Paola has experience in AutoCAD, ArcGIS, Solid Works, Microsoft Office, technical writing, literature review, OpenPave, EverFE, and MATLAB.

Representative Projects
Annual  Overlay/Rehabilitation,  2017‐2018  and  2020‐2021  Pavement  Design  and PS&E,  City  of  San  Leandro,  CA.  Project  Engineer/Technical  Lead.  NCE  prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement  investigation  and  design  and  preparation  of  civil  design  PS&Es  for construction. Pavement design solutions included conventional and rubberized hot mix  asphalt  overlays,  full‐depth  asphalt  reconstruction,  FDR  in  lieu  of  more expensive  conventional  reconstruction,  and  a  pilot  project  for  cold  central  plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.

Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes.

NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state  routes.  NCE’s  engineer’s  estimate  matched  that  of  the  winning  contractor  bid,  indicating  that  NCE  was  able  to anticipate the value of the scope of work and contractor climate. 2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Staff Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐year Paving Work Plan,  updating  the  City’s  maintenance  and  rehabilitation  decision  tree,  evaluating  alternative  pavement  treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million. Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage  improvements,  sidewalk  replacement,  pavement  design  recommendations,  PS&Es,  and  bidding  and construction support services.
2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San  Francisco,  CA.  Staff  Engineer.  NCE  is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West  of  101  Pavement  Rehabilitation  Project’s  goal  is  to  perform  deferred  maintenance  west  of  101,  outside  of  the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals,  overlays  and  surface  reconstruction  as  maintenance  and  rehabilitation  strategies.  West  of  US101  there  are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP)  StreetSaver®  database  program.  NCE  is  responsible  for  project  management,  pavement  rehabilitation  design, PS&E, and bidding and construction support services.

FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Staff Engineer. NCE has developed 5‐Year work plan for the City with surface seal  and rehabilitation projects based on City’s SB1 funding, as well as pavement

Education
BS, Civil Engineering with a
minor in Construction
Engineering and Management,
University of California, Davis,
2018
Joined NCE
2019
Total Years of Experience
2 years

Page 63 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 36
management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments  to  finalize  the  work  plan.  NCE  then  scheduled  field  calibration  meeting  with  City  staff  to  discuss  various surface  seal  applications  and  base  repair  criteria.  Cost  effective  cape  seal  with  leveling  courses  were  designed  on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included  pavement  coring,  curb/gutter replacement,  utility  coordination,  curb  ramp  design,  drainage  improvements,  pavement  design  recommendations, PS&Es, and bidding and construction support services.

Pavement Rehabilitation/Maintenance and Bikeway Improvements, Presidio Trust of San Francisco, CA. Staff Engineer.

NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement  design,  a  roundabout,  extensive  modification  to  existing  striping  and  markings  to  introduce  class  II  and  III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform. As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage.  The  pavement  design  considered  a  number  of  different  factors,  including  medians,  curb  reveal,  depth  to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.

Yellow  Brick  Road  Complete  Streets,  City  of  Richmond,  CA.  Staff  Engineer.  The  Yellow  Brick  Road  Complete  Streets Project proposes to address key community‐identified barriers, issues, and opportunities in the community in order to design and implement complete streets improvements along roadways in the community‐identified Yellow Brick Road network.  The  routes  will  connect  the  key  assets  in  the  neighborhood,  including  local  elementary  schools,  parks,  and transit. Improvements include Class II bicycle facilities, extended sidewalks, decorative crosswalks, pedestrian and bicycle wayfinding  signs,  pedestrian‐scale  lighting,  landscaping,  curb  extensions,  roundabouts  and  traffic  circles,  ADA  curb ramps, speed tables, raised intersections and crosswalks, rectangular rapid flashing beacons, median refuges, back‐in angled parking, green painted bicycle lanes, landscaped median refuges, and trail crossings. In addition, innovative design elements include raised crosswalks and intersections as traffic‐calming measures and a HAWK (High‐Intensity Activated crossWalK) beacon at an intersection with heavy vehicle and pedestrian interactions where a traditional signal cannot be installed.
2020/21  Pavement  Rehabilitation,  Town  of  Moraga,  CA.  Staff  Engineer.  NCE  performed  civil  and  limited  pavement design services to develop the project plans, technical specifications, and engineer’s estimate on behalf of the Town.

Staff quality controlled the base repair locations and updated final markings in white paint. Final locations were collected electronically with GPS along with the updated dimensions. The project included improvements for nine curb ramps, with one requiring a custom detail in the plans. Staff performed QC on the Town’s preliminary curb ramp designs and prepare final edits, as needed. NCE and Town staff also conducted a site walk to review existing conditions to confirm pavement design treatments and curb ramp designs, based on visual assessment. NCE was asked to provide support services during construction.  Services  include  attendance  at  the  pre‐construction  meeting,  reviewing  Contractor  material  submittals, responding  to  Contractor  requests  for  information,  field  marking  and  verifying  measurement  of  base  repair  (digout) areas, providing recommendations for any necessary construction changes due to unforeseen field conditions, assisting with  the  review  of  Contract  Change  Orders,  and  Prepare  and  submit  record  drawings  based  upon  the  Contractor's representation of actual construction (one printed copy and one electronic copy in AutoCAD and PDF formats). Paola was responsible for transposing the design data gathered (e.g., base repairs, curb and gutter repairs, existing striping and markings, and existing utilities) onto the plans, while concurrently populating the engineer’s estimate.

Point Molate Beach Park Erosion Assessment, City of Richmond, CA. Staff Engineer. The City retained NCE to provide engineering services to restore a section of shoreline at the Point Molate Beach Park. The NCE team prepared an erosion assessment and alternatives study to determine cost‐effective shore restoration measures that could be permitted. NCE is working with regulatory and permitting agencies to provide the appropriate design that can be implemented at the earliest possible time to stop the advancing beach erosion at the site.

Page 64 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 37
Alejandro (Alex) Paez
CAD Designer
Alex Paez is CAD Designer with 20+ years of extensive experience. He has provided CAD  for  pavement  rehabilitation  and  reconstruction  projects  for  local  cities throughout the Bay Area. Alex has worked on seismic retrofits for both commercial and residential structures and highway and rail infrastructure projects for Caltrans.

Representative Projects
2017  to  2022  Street  Surface  Seal  and  Rehabilitation  Projects,  City  of  South  San Francisco,  CA.  CAD  Designer.  NCE  has  been  providing  to  the  City  a  various  of pavement management services including development of a multi‐year Paving Work Plan,  updating  the  City’s  maintenance  and  rehabilitation  decision  tree,  evaluating alternative  pavement  treatment  technologies,  and  development  of  construction documents for bidding. In 2017 to 2021 pavement management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 48 centerline  miles  (more  than  200  sections)  of  City  streets  with  a  construction  cost over  $14  million.  In  addition,  NCE  has  modified  City’s  Street  Saver  database  and updated  historical  maintenance  and  rehabilitation  records  to  perform  budget analyses and develop multi‐year work plan. Recently, City’s 6‐Year Work Plan was updated  based  on  City’s  budget,  rehabilitation  strategy  and  candidate  streets  are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget. NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. 2022  West  Highway  101  Pavement  Rehabilitation  Project,  City  of  South  San  Francisco,  CA.  CAD  Designer.  NCE  is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West  of  101  Pavement  Rehabilitation  Project’s  goal  is  to  perform  deferred  maintenance  west  of  101,  outside  of  the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals,  overlays  and  surface  reconstruction  as  maintenance  and  rehabilitation  strategies.  West  of  US101  there  are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP)  StreetSaver®  database  program.  NCE  is  responsible  for  project  management,  pavement  rehabilitation  design, PS&E, and bidding and construction support services.

FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. CAD Designer. NCE has developed 5‐Year work plan for the City with surface seal  and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments  to  finalize  the  work  plan.  NCE  then  scheduled  field  calibration  meeting  with  City  staff  to  discuss  various surface  seal  applications  and  base  repair  criteria.  Cost‐effective  cape  seal  with  leveling  courses  were  designed  on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part  of  this  project,  NCE  civil  and  pavement  engineering  design  services  included  pavement  coring,  curb/gutter replacement,  utility  coordination,  curb  ramp  design,  drainage  improvements,  pavement  design  recommendations, PS&Es, and bidding and construction support services.

Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. CAD Designer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector,  and  residential  streets  (5  miles).  NCE’s  scope  of  work  included  pavement  investigation  and  design  and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and

Education
AAS, ITT Technical Institute,
Rancho Cordova, CA, 1991
Joined NCE
2014
Years of Experience
20 years

Page 65 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 38
a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.

Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.

Mill Valley Sausalito Multi‐Use Trail, County of Marin, CA. CAD Designer. NCE was initially selected by the County to provide treatment recommendations for temporary rehabilitation strategies for portions of the 1.8‐mile Mill Valley – Sausalito Multiuse Path that are typically underwater during king tides. The County then asked NCE to prepare plans, specifications and cost estimate (PS&E) from Gate 6 Road to Almonte Blvd based upon our initial recommended Option 1A‐ “Micromill Surface and Type 2 Mircosurfacing.” This surface seal recommendation is a stop gap interim maintenance measure for the Trail and will have a short‐term design life (a few years) due to the frequent tidal inundation of the path.

Transportation Infrastructure and Rehabilitation Program (TIRP), City of Davis, CA. CAD Designer. This project involved producing pavement rehabilitations for 698 street sections in Davis  from 2015 to 2020 with a construction cost over $18.5 million. The project involved non‐destructive pavement deflection testing, pavement coring, pavement condition surveys and base repair location identification. Following the collection of the field data, rehabilitative recommendations were made based on each street segment’s structural integrity and performance. Recommendations for each section were summarized in a pavement design report and submitted to the City. In addition, NCE has updated City’s pavement management program (PMP) in 2015 and 2018 and was recently selected to perform the City’s 2021 PMP update.

Parking Lot Rehabilitation and ADA Upgrades at Kids Castle Center, Contra Costa County, Pittsburg, CA. CAD Designer.

NCE is providing civil engineering design services associated with replacement/rehabilitation of the pavement within the parking lot, as well as American with Disabilities Act (ADA) upgrades, and improvements to curb and gutter and drain inlet  at  the  Kid's  Castle  Center.  NCE  is  preparing  plans  and  specifications  suitable  for  public  bidding  for  pavement rehabilitation  to  address  failed  pavement  and  flatwork  to  address  ADA  parking,  ADA  compliant  path  of  travel,  and accessibility to the facility. The pavement of the parking lot at the facility shows various signs of structural failure including alligator cracking. In addition, the ADA parking and path of travel is not to current standards and is in need of upgrades.

The parking lot is roughly 115 feet in length in the east‐west direction, and about 65 feet in the north‐south direction. It has one lane for vehicle travel, and two parking lanes.

Parking Lot Rehabilitation and ADA Upgrades at YV Library, Contra Costa County, Walnut Creek, CA. CAD Designer. NCE is  providing  civil  engineering  design  services  associated  with  replacement/rehabilitation  of  the  pavement  within  the parking lot, as well as American with Disabilities Act (ADA) upgrades, and improvements to curbs at the Ygnacio Valley Library parking lot.  NCE is preparing plans and specifications suitable for public bidding for pavement rehabilitation to address failed pavement and flatwork to address ADA  parking, ADA compliant path of travel, and accessibility to the facility. The pavement of the parking lot at the facility shows various signs of structural failure including alligator cracking.

In addition, the ADA parking and path of travel is not to current standards and is in need of upgrades. The parking lot is L‐shaped and roughly 245 feet in length in the east‐west direction, and about 270 feet in the north‐south direction. The entire project area including hardscape, parking area, and landscaping is approximately 1.3 acres. The parking area next to Oak Grove Road has one lane for vehicle travel, and two parking lanes. The parking area to the southeast of the library building has two travel lanes and 3 parking lanes.

Rumrill  Boulevard  Complete  Streets  and  Green  Infrastructure  Project,  City  of  San  Pablo,  CA.  CAD  Designer.  NCE  is designing  an  approximately  $15  million  in  construction  value,  2.5‐mile‐long  complete  streets  project  along  Rumrill Boulevard. Key project elements include landscape buffers, widened bus stop landings, increasing parking, and video detection at traffic signals for vehicles and bicycles. In addition, the project will include LID design and bioretention basins, landscaping  improvements,  curb  extensions/bulbouts,  sidewalk  widening,  crosswalk  improvements  with  rectangular rapid  flashing  beacons,  median  refuges  bus  stop  shelters,  expanded  street  lighting,  ADA  concrete  and  roadway improvements (curb ramps, sidewalks, driveways, medians, and regrading pedestrian roadway crossings), storm drainage improvements,  trail  crossings,  wayfinding  signs,  pedestrian  and  street  lighting.  A  critical  element  of  the  project  was integrating significant Green Infrastructure (GI) to improve localized drainage and achieve targets set by the Municipal Regional Permit.

Page 66 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | 39
4) Fee Schedule
Street List

Page 67 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 40
Proposed Project Schedule
We understand that this resurfacing project is to be designed by February 2023, bid mid‐winter, and construction starting in summer 2023. We anticipate completing Issued for Bidding PS&E by February 2023 providing a notice to proceed is received no later than May 4th, 2023, as shown in the attached detailed schedule.

Page 68 of 189 ends

City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022

Page  | 42

Page 69 of 189 ends

City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022

Page  | 43
5) Preliminary Sheet List and Technical Specifications Sections NCE proposed the following sheet list in our 2016 Street Resurfacing Project with the City:

1. Cover Sheet

2. Notes, Legend, and Abbreviations

3. Core Summary Table

4. Civil Improvement Layouts (Plan only)

5. Striping Improvement Layouts

6. Civil and Striping Details

7. Custom Curb Ramp Details
Recognizing that the 2022‐2023 Street Resurfacing Project planset is slightly different we would propose the following changes to this year’s gameplan:

1. The civil improvement layouts would have plan and profile.

On  the  proposed  alternative,  only  the  reconstruction streets  (FDR)  and  streets  with  drainage  improvements would be shown with plan and profile. When there would
be no regrading of the street (mill and overlay or surface reconstruct) only plan view will be laid out.

2. The  striping  improvement  layout  would  only  apply  to Carter St (arterial). Minor striping on other streets will be included in the respective civil improvement layouts.

The scope of work anticipated for the 2022‐2023 Street Resurfacing Project  may  include  similar  technical  specifications  to  the  2016 resurfacing  project  such  as;  mobilization,  clearing  and  grubbing, traffic control, remove existing thermoplastic striping and markers, adjust  existing  utility  covers  and  frame  to  finish  grade,  concrete improvements (curb and gutter, curb ramps, detectable warning surface retrofit), full depth base repairs, cold planing (milling), crack sealing, remove surfacing and base, subgrade preparation, hot‐mix asphalt overlay, thermoplastic striping and pavement markings, and pavement markers.  Due to observed fatigue cracking and subgrade material pumping and other existing conditions additional technical specification sections may include full‐depth reclamation, cement or lime stabilization (if needed), rubberized hot‐mix asphalt, cape seal, or microsurfacing. 6) Required Statements
This proposal shall remain effective for ninety (90) days from beyond the date of submittal.

Page 70 of 189 ends

Collaboration. Commitment. Confidence.
www.ncenet.com

Page 71 of 189 ends

City Council Agenda Report Item #
Meeting Date: May 9, 2022
Subject: Setting the Time and Place of the Public Hearing for Daly City’s National Pollutant Discharge Elimination System Program Regulatory Fee Recommended Action
It is recommended the City Council set the time and place of a public hearing for 7:00 p.m., June 13, 2022 to review the local National Pollutant Discharge Elimination System (NPDES) Stormwater Regulatory Fee.

Background
The San Francisco Regional Water Quality Control Board issued a consolidated Bay Area Municipal Regional Permit (MRP) on November 19, 2015. The permit conditions mandate numerous and costly municipal stormwater management activities over the following five years. The City/County Association of Governments continues to administer the General Program components. Each municipality is responsible for achieving specific program activities and filing an annual report on city specific and county-wide compliance activity. The City first established a stormwater fee in 1995 several years after the NPDES regulatory program was initially established in 1991 in order to finance the many new municipal activities required under to comply with this program.

Discussion
Since 1995, Daly City utilized the regulatory fee structure adopted in Ordinance No. 1219 to finance local specific activities to comply with mandated Stormwater Program requirements. This fee structure has not been amended or increased at any time in the past 26 years. This fee structure remains as follows for each Assessor Parcel Number:

Single Family/Duplex $9.80 Multi-Family (11-20 units) $36.76 Unimproved Land $4.90 Commercial/Retail/Manufacturing $56.84 Multi-Family (3-10 units) $19.60 Condominiums $4.90 On an annual basis, this local fee generates approximately $449,000. Its structure is based on the correlation between parcel size, land use and stormwater runoff, with the base fee assigned to single family/duplex parcels as they are the City’s predominant land use. To allocate costs proportionately, all other categories of use are assigned a factor compared to single family/duplex and take into account street frontage, impervious surface coverage and vehicle trips.

From its prior action, the City Council already authorized continued use of the San Mateo County Flood Control District to collect charges associated with the Countywide NPDES General Program.

Staff is available to provide any additional information desired by the Mayor or City Council members.

Page 72 of 189 ends

Public Hearing: NPDES Local Program Regulatory Fee
Meeting Date: May 9, 2022

Page 2 of 2 ends

Respectfully submitted,
Sibely Calles Richard Chiu, Jr.

Senior Management Analyst Director of Public Works

Page 73 of 189 ends

City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Approve FY 2022-23 Project List for Road Maintenance and Rehabilitation Account Funds Authorized Under SB 1
Recommended Action
Recommend the City Council adopt a Resolution approving the FY 2022-23 Project List for SB 1 Road Maintenance and Rehabilitation Account Funds
Background/Discussion
SB 1 (Beall) was filed with the Secretary of State on April 28, 2017. The bill established a Road Maintenance and Rehabilitation Account (RMRA) in the State Transportation Fund that is intended to address deferred maintenance on the state highway system and the local street and road network.

As written, SB 1 requires the California Transportation Commission (CTC) adopt criteria to ensure efficient use of these funds. The RMRA funds will be provided to cities on a monthly basis along with traditional gas tax monthly disbursements, with the first distribution in January 2018.

A city or county must submit a project list and supporting documentation to the CTC each year, which means the FY22-23 project list will need to be submitted by July 1, 2022. Public Works staff recommends using the RMRA funds for the next annual slurry seal and resurfacing projects projected for completion in the summer/fall of 2023. Staff has identified the Westlake Street Slurry Seal, the 2022-23 Street Resurfacing project, the 2023-24 Street Resurfacing project, and the 2020- 21 Street Resurfacing Project as projects to be designed and/or constructed in the FY 2022-23 cycle. All projects are identified in the City’s ten-year Capital Improvement Plan (CIP).

Fiscal Impact
The approval of this recommendation will satisfy the CTC Project List requirement to receive SB1 funds in the amount of approximately $2.4 million.

Summary/Conclusion
Recommend the City Council adopt a Resolution approving the FY 2022-23 Project List for SB 1 Road Maintenance and Rehabilitation Account Funds.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Page 74 of 189 ends

Approve FY 2022-23 Project List for Road Maintenance and Repair Account Funds Authorized Under SB 1
Meeting Date: May 9, 2022

Page 2 of 2 ends

Respectfully submitted,
Sibely Calles Richard Chiu
Senior Management Analyst Director of Public Works
Attachments: Westlake Street Slurry Seal Project Location Map 2020-21 Street Resurfacing Project Location Map
2022-23 Street Resurfacing Project Location Map
2023-24 Street Resurfacing Project Location Map
Draft Resolution

Page 75 of 189 ends

PROJECT LOCATION MAPCITY OF DALY CITY2022-23 WESTLAKE SLURRY SEAL

SAN MATEO COUNTY, CALIFORNIA

Page 76 of 189 ends

2022-23 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIA

Page 77 of 189 ends

SAN FRANCISCOCITY OF SOUTH

DALY CITYCALTRANS

DALY CITYCALTRANS
Feet1" = 1000'-0"200010000500

LEGENDSELECTED STREET SECTION
2020-21 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIA

Page 78 of 189 ends

2024 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIACITY OF DALY CITYPROJECT LOCATION MAP

Page 79 of 189 ends

RESOLUTION NO._______

RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022-23 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017

WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and

WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of Daly City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and

WHEREAS, the City of Daly City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and

WHEREAS, the City of Daly City, will receive an estimated $2.4 million in RMRA funding in Fiscal Year 2022-23 from SB 1; and

WHEREAS, this is the 6th year in which the City of Daly City is receiving SB 1 funding and will enable the City of Daly City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and

WHEREAS, the City of Daly City has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and

WHEREAS, the City of Daly City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and

WHEREAS, the funding from SB 1 will help the City of Daly City maintain and rehabilitate approximately 18 miles of street pavement in the Westlake Street neighborhood and throughout the City of Daly City this year and dozens of similar projects into the future; and

WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City of Daly City’s streets and roads are in a “good” condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a “excellent” condition; and

Page 80 of 189 ends

WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.

NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by City Council of the City of Daly City, State of California, as follows:

1. The foregoing recitals are true and correct.

2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues:

The Westlake Street Slurry Seal project will apply surface seal to approximately 15 miles in the Westlake neighborhood (Map Attached). This project will be designed in the winter of 2022 and constructed in the summer of 2023. The useful life of the pavement treated with surface seal is approximately seven (7) years.

The 2022‐23 Resurfacing Project will overlay asphalt concrete and reconstruct with other treatment options to 17 streets in the Mission neighborhood, John Daly Blvd, Skyline Ave, and Alta Vista. (Map Attached). This project will be designed in the winter of 2022 and constructed in the summer of 2023. The useful life of the pavement with an overlay is approximately twenty (20) years.

The 2023-24 Street Resurfacing Project will repair and overlay street segments selected from the City's 5-year Master Plan for street repair and resurfacing in coordination with the City's Pavement Management System. Work will be done on Mission St, John Daly Blvd, Avalon Dr, and Palmdale. This project will be designed in FY2023. The useful life of the pavement with an overlay is approximately twenty (20) years.

3. The following previously proposed and adopted projects may also utilize Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Daly City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:

The 2020-21 Street Resurfacing Project consists of overlay asphalt concrete and reconstruct with other treatment options to six (6) street segments (Map Attached). This project was designed in the winter of 2021 and will be constructed in the summer of 2022. The useful life of the pavement with an overlay is approximately twenty (20) years.

Page 81 of 189 ends

PASSED AND ADOPTED by the City Council of the City of Daly City, State of California this _______ day of _______, 2022, by the following vote:
-

Page 82 of 189 ends

City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Approval of the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue
Recommended Action
It is recommended that the City Council adopt a resolution to approve the Final Map – SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue Background
The Final Map – SUB-4-16-12037, One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue consists of the conversion of a portion of the vacant 9,736 square foot retail space at the street level of the existing building.

On April 11 th, 2005, the City Council approved the existing building at 2665 Geneva Avenue (between Calgary Street and Rio Verde Street) consisting of a mixed-use building with ground floor commercial uses and 72 residential rental apartments on the upper four levels of the building. At the time of approval, the commercial uses consisted of one 10,110 square foot retail unit facing Geneva Avenue and two retail units totaling 2,998 square foot facing Rio Verde Street. The square footage of the retail space was reduced to 9,736 square feet during the plan check process.

On July 1, 2008, a Tentative Map was approved for airspace subdivision of the 72 residential rental apartments and 3 retail units within the previously approved building. On July 13, 2009, the City Council accepted the public improvements and approved the Final Map for the Map of the Geneva - A Subdivision for Residential and Retail Condominium Purposes, which created the 72 residential condo units and 3 retail condo units.

On April 24, 2017, the City Council approved the Zone Change ZC-4-16-12036, Major Subdivision SUB-4-16-12037, Use Permit UP-4-16-12038, Design Review DR-4-16-12040, and Negative Declaration CEQA-4-16-12039 of the retail conversion to residential units at 2665 Geneva Avenue.

The project will convert a portion of the vacant 9,736 square foot retail space at the street level of the existing building to seven residential condo units and one 1,950 square foot retail condo unit, for a total of 79 residential condo units and 3 retail condo units.

Discussion
The subdivision of real property and requirement to prepare a Tentative and Final Map are established and regulated by the Subdivision Map Act (California Government Code Section 66410 et. seq.) and Title 16, Subdivisions, of the Daly City Municipal Code. The City Council approved a time extension for the Tentative Map on April 22, 2019 and was automatically extended for an additional 18 months by AB1561. The Tentative Map for 2665 Geneva is set to expire on October 24, 2022.

Page 83 of 189 ends

Approval of the Final Map Major SUB-4-16-12037,
A One-Lot Resubdivision for Condominium Purposes
at 2665 Geneva Avenue
Meeting Date: May 9, 2022

Page 2 of 2 ends

The public improvements required for the existing mix-use building were completed and accepted on July 13, 2009. There were no additional public improvements required with the approval of the Major Subdivision SUB-4-16-12037 on April 24, 2017. There are no subdivision improvements associated for the project and a subdivision improvement agreement will not be needed to record the Final Map. The First Amendment to Declaration of Restrictions (CC&R’s) has been reviewed and approved by the City Attorney and the Engineering Department.

Fiscal Impact
The Subdivider is required to pay the following fee types as a part of the entitlement process for this subdivision.
Park-in-lieu fees
Building Permit fees
Plan and Map check fees
DWWR fees
AB-1600 fees
All fees have been paid or will be paid at the time of building permit. Building Permits will not be issued until all applicable fees have been paid. All work will be paid for by the Subdivider.

Summary/Conclusion
The Final Map have been reviewed by the City and meet all legal requirements and Conditions of Approval.

It is recommended that the City Council adopt a resolution to approve the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue Respectfully submitted,
Roland Yip, P.E. Richard Chiu, Jr., P.E.

Senior Civil Engineer Director of Public Works
Attachment: Attachment 1 – Final Map SUB-4-16-12037

Page 84 of 189 ends
Page 85 of 189 ends
Page 86 of 189 ends

City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Authorize the City Manager to Execute a Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project Recommended Action
Staff recommends that the City Council authorize the City Manager to execute an agreement and any amendments, in an amount not to exceed $137,445 for professional services with CSG Consultants Inc. (CSG), of Foster City, California, to provide engineering design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.

Background
The San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project includes the replacement of approximately 1,600 feet of existing 2-inch to 4-inch cast and galvanized iron water main with new 6-inch to 8-inch lines. The project limits are along Santa Cruz Avenue and San Diego Avenue between the city limits and Hillcrest Drive, and Guadalupe Avenue between Santa Cruz Avenue and San Diego Avenue. The installation of the new water lines will address fire flow and aging infrastructure issues in the project area.

Discussion
Staff released a Request for Proposals (RFP) for design services on February 15, 2022 to 18 firms from the City’s 2021 General Engineering short list with expertise in water main replacement design. Seven firms submitted proposal by the due date of March 25, 2022. A panel consisting of staff from the Public Works and Water and Wastewater departments evaluated the proposals on their technical merits. The panel determined CSG has the experience and qualifications that most closely met the needs of the project.

The scope of work with CSG under this professional services agreement includes the following:
Geotechnical services including field exploration, laboratory testing, engineering analyses, and report preparation;
Utility field verification (potholing) and utility conflict resolution; Topographic survey of the immediate surroundings, identifying structures, utilities, and any prominent features that will affect the replacement of the water mains; Coordinate with utility agencies to help avoid potential construction delays and unnecessary disruptions to public services;
Assess the suitability for trenchless replacement for the existing utility; Develop design plans, specifications, and construction cost estimates (PS&E) and Bid construction and support.

Page 87 of 189 ends

Authorizing Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project Meeting Date: May 9, 2022

Page 2 of 2 ends

Fiscal Impact
The professional services agreement provides a not-to-exceed fee of $124,950. This amount includes geotechnical services, utility field verification, topographic survey, and design services.

An additional $12,495 (10%) is needed for contingency which brings the total cost to $137,445.

Sufficient funds are available in the FY 2021-22 Water Fund – San Diego/Santa Cruz/Guadalupe projects account 41-385-758 for this professional services contract.

Summary/Conclusion
Staff recommends that the City Council authorize the City Manager to execute an agreement and any amendments, in an amount not to exceed $137,445 for professional services with CSG Consultants Inc., of Foster City, California, to provide engineering design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Mike Burnfield Richard Chiu Jr.

Engineer 1 Director of Public Works
Attachments:

1. Project Location Map

2. CSG Consultants Professional Services Agreement

Page 88 of 189 ends

-1-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

AGREEMENT WITH CSG CONSULTANTS

FOR DESIGN PROFESSIONAL SERVICES
FOR
City of Daly City

This Agreement, made and entered into this ____ day of __________, 2022 (the “Effective Date”) by and between the CITY OF DALY CITY , a municipal corporation existing under the laws of the State of California (”CITY"), and CSG C onsultants, a California S-Corporation ("CONSULTANT"):

CSG Consultants
550 Pilgrim Drive
Foster City, CA 94404

R E C I T A L S :

A. CITY desires certain construction document serv ices hereinafter described as the design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.

B. CITY desires to engage CONSULTANT to provide th ese consulting services by reason of its qualifications and experience for per forming such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.

NOW, THEREFORE, IT IS AGREED as follows:

SECTION 1 - SCOPE OF SERVICES

The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, the proposal from C SG Consultants dated April 21, 2022, attached and incorporated by reference.

SECTION 2 - DUTIES OF CONSULTANT

CONSULTANT shall be responsible for the professiona l quality, technical accuracy and coordination of all work furnished by CONSULTANT un der this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.

CONSULTANT represents that it is qualified to furni sh the services described under this Agreement.

CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.

Page 89 of 189 ends

-2-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
SECTION 3 - DUTIES OF CITY

CITY shall provide pertinent information regarding its requirements for the project.

CITY shall examine documents submitted by CONSULTAN T and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT'S work.

SECTION 4 - TERM

The services to be performed under this Agreement shall commence on the Effective Date and be completed within two (2) years.

SECTION 5 - PAYMENT

Payment shall be made by CITY only for services ren dered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT, on a time and materials basis, pursuant to rates stated in Exhibit A to this Agreement attached and incorporated by reference. In no event shall CONSU LTANT’s total compensation under this Agreement exceed one hundred twenty-four thousand nine hundred and fifty dollars ($124,950).

SECTION 6 – TERMINATION

Without limitation to such rights or remedies as CI TY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspe nd work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.

Upon termination and upon CITY'S payment of the amo unt required to be paid, documents become the property of CITY, and CONSULTANT shall t ransfer them to CITY upon request without additional compensation.

SECTION 7 - OWNERSHIP OF DOCUMENTS

All documents prepared by CONSULTANT in the perform ance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.

SECTION 8 - INDEPENDENT CONTRACTOR

It is understood that Consultant, in the performanc e of the work and services agreed to be performed, shall act as and be an independent contr actor and shall not act as an agent or employee of the City. Consultant shall obtain no r ights to retirement benefits or other benefits which accrue to City's employees, and Consultant he reby expressly waives any claim it may have to any such rights.

Page 90 of 189 ends

-3-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

SECTION 9 - CONFIDENTIALITY

All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by C ITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.

SECTION 10 - INTEREST OF CONSULTANT

CONSULTANT covenants that it presently has no inter est, and shall not acquire any interest, direct or indirect, financial or otherwise, which w ould conflict in any manner or degree with the performance of the services under this Agreement.

SECTION 11 – USE OF SUBCONSULTANTS

CONSULTANT shall not subcontract any services to be performed by it under this Agreement without the prior written approval of the CITY, exc ept for service firms engaged in drawing, reproduction, typing, and printing. CONSULTANT sha ll be solely responsible for reimbursing any subconsultants and the CITY shall have no obligation to them.

SECTION 12 - CONSULTANT'S STATUS

It is expressly agreed that in the performance of t he professional services required under this Agreement, CONSULTANT shall at all times be conside red an independent CONSULTANT as defined in Labor Code Section 3353, under control o f the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.

SECTION 13 – SB 1383 COMPLIANCE

To the extent applicable, CONSULTANT shall comply w ith the requirements set forth in SB 1383 and Public Contracts Code Section 22150 for th e procurement of recycled paper products.

To the extent that the fitness and quality are equa l, CONSULTANT shall purchase recycled products, as defined in Public Contracts Code Secti on 12200 instead of nonrecycled products.

Upon completion of the term of this Contract, CONSULTANT shall provide records to the CITY demonstrating compliance with this section, includi ng copies of all invoices, receipts, or other proofs of purchase that detail the procurement of paper products.

SECTION 14 - INDEMNITY

To the fullest extent permitted by law (including, without limitation, California Civil Code Sections 2782 and 2782.6), Consultant and Consultan t’s sureties agree to defend (with legal counsel acceptable to the City), indemnify and hold harmless the City, its officers, agents, officials, representatives, employees and volunteer s (collectively “Indemnitees”) from and

Page 91 of 189 ends

-4-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
against any and all claims, demands, actions, losse s, damages, injuries, and liability, direct or indirect (including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses and fees of ex pert consultants or expert witnesses incurred in connection therewith and costs of investigation), t hat arise out of, pertain to, or relate to, directl y or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Consultant, any Subconsultant, anyone directly or i ndirectly employed by them, or anyone that they control (collectively “Liabilities”). Such ob ligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the ext ent that such Liabilities are arise out of the sole negligence, active negligence, or willful misconduct of Indemnitee.

Acceptance by the City of the work performed under this Agreement does not operate as a release of Consultant from such professional resp onsibility for the work performed pursuant to this Agreement.

The duty of Consultant and its sureties to indemni fy and hold harmless as set forth above, shall include the duty to defend as set forth in Se ction 2778 of the California Civil Code, provided, however, that nothing herein shall be con strued to require the Consultant to indemnify the City, its subsidiary districts, its officers, a gents or employees against any responsibility for liability in contravention of Section 2782 of the C alifornia Civil Code. To the extent there is an obligation to indemnify under this Section, Consult ant shall be responsible for incidental and consequential damages resulting directly or indirec tly, in whole or in part, from Consultant’s negligence, recklessness, or willful misconduct.

Consultant and its sureties expressly and specific ally agree to waive any and all subrogation rights it may have against the City, it s subsidiary districts, officers or employees.

Indemnification and waiver of subrogation contained in this section shall remain operative and in full force and effect regardless of any termination of this Agreement.

SECTION 15 - INSURANCE

CONSULTANT shall procure and maintain for the durat ion of the contract and three years thereafter (five years for building or major improv ements) insurance against claims for injuries to persons or damages to property which may arise f rom or in connection with the performance of the work hereunder and the results of that work by the CONSULTANT, his agents, representatives, employees or subcontractors.

MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL) : Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, inc luding products-completed operations, personal & advertising injury, with lim its no less than $2,000,000 per occurrence. If a general aggregate limit applies, e ither the general aggregate limit shall apply separately to this project/location or the ge neral aggregate limit shall be twice the required occurrence limit.

Page 92 of 189 ends

-5-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1) , or if CONSULTANT has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: as required by the State of California, with Statut ory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.

4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the CONSULTANT.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The City, its elected and appointed officials, empl oyees, and agents are to be covered as insureds on the auto policy for liability arising out of au tomobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or o n behalf of the CONSULTANT including materials, parts or equipment furnished in connecti on with such work or operations. General liability coverage can be provided in the form of a n endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and ap pointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.

Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.

Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of any ri ght to subrogation which any insurer of said CONSULTANT may acquire against the City by vir tue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any en dorsement that may be necessary to effect this waiver of subrogation, but this provisi on applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

Deductibles and Self-Insured Retentions

Page 93 of 189 ends

-6-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverag e with a lower deductible or retention or provide proof of ability to pay losses and relat ed investigations, claim administration, and defense expenses within the retention.

Acceptability of Insurers

Insurance is to be placed with insurers with a curr ent A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Claims Made Policies (note – should be applicable only to professional liability, see below) If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown, and must be bef ore the date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insura nce must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not rep laced with another claims-made policy form with a Retroactive Date prior to the contract Effective Date, the CONSULTANT must purchase “extended reporting” cover age for a minimum of five (5) years after completion of work.

Verification of Coverage
CONSULTANT shall furnish the City with original cer tificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received an d approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONSULTANT’s obligation to prov ide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

SECTION 16 - NONASSIGNABILITY

Both parties hereto recognize that this Agreement i s for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontract ed by CONSULTANT without the prior written consent of CITY.

SECTION 17 - RELIANCE UPON PROFESSIONAL

SKILL OF CONSULTANT

It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to pe rform the work agreed to be done under this Agreement and that CITY relies upon the skill of CO NSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation.

Page 94 of 189 ends

-7-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

SECTION 18 - WAIVERS

The waiver by either party of any breach or violati on of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, covenant, condition, ord inance or law or of any subsequent breach or violation of the same or of any other term, conditi on, ordinance, or law. The subsequent acceptance by either party of any fee or other mone y which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.

SECTION 19 – SEVERABILITY

If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

SECTION 20 - COSTS AND ATTORNEY FEES

Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of a ttorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardles s of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that n either party shall have to pay the other more than $5000 for attorney fees arising out of an action, o r actions to enforce the provisions of this Agreement.

SECTION 21 - NON-DISCRIMINATION

CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment o pportunity. Neither CONSULTANT nor any of its subconsultants shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap , medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualific ation pursuant to the California Fair Employment and Housing Act.

SECTION 22 - MEDIATION

Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation wit hin 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absen ce of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed -upon service. The mediator shall be selected by a blind draw.

Page 95 of 189 ends

-8-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to f ile a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the media tor, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.

SECTION 23 - LITIGATION

CONSULTANT shall testify at CITY'S request if litig ation is brought against CITY in connection with CONSULTANT'S services under this Ag reement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT'S wrongd oing, CITY shall compensate CONSULTANT for preparation for testimony, testimony , and travel at CONSULTANT'S standard hourly rates at the time of actual testimony.

SECTION 24 - NOTICES

All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:

To CITY: City Engineer
City of Daly City
Public Works – Engineering Division
333 90
th Street
Daly City, CA 94015

To CONSULTANT: Hatem Ahmed
CSG Consultants
555 Pilgrim Drive
Foster City, CA 94404

SECTION 25 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT

This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, r epresentations, and agreements, either written or oral.

This document may be amended only by written instru ment, signed by both CITY and CONSULTANT.

Page 96 of 189 ends

-9-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

SECTION 26 – AUTHORITY TO ENTER INTO AGREEMENT

CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party war rants that the individuals who have signed this Agreement have the legal power, right, and aut hority to make this Agreement and to bind each respective party.

SECTION 27 - GOVERNING LAW AND VENUE

This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.

IN WITNESS WHEREOF, CITY and CONSULTANT have execut ed this Agreement the day and year first above written.

CITY OF DALY CITY CON SULTANT

CSG Consultants

_______________________________ _________ ________________________ Shawnna Maltbie Cyrus Kianpour
City Manager President

APPROVED AS TO FORM

_______________________________
Rose Zimmerman
City Attorney

Page 97 of 189 ends

-10-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc

EXHIBIT A

Page 98 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT

Table of Contents
S E C T I O N 1 Letter of Transmittal

S E C T I O N 2 Firm Profile and Project Team

S E C T I O N 3 Relevant Experience

S E C T I O N 4 Project Approach, Organization, & Local Presence

S E C T I O N 5 Appendix: Resumes

S E C T I O N 6 Cost Proposal (Separate Submittal)

Page 99 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 550 Pilgrim Drive, Foster City, CA 94404
phone (650) 522-2500 | fax (650) 522-2599 | www.csgengr.com Letter of Transmittal
April 21, 2022
Michael Burnfield, Engineer 1
City of Daly City – Engineering Division
333 – 90th Street
Daly City, CA 94015
RE: San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project CSG Consultants, Inc. (CSG) is pleased to present our revised proposal to provide engineering services for San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project (Project) for the City of Daly City (City).

We understand the City is seeking a qualified firm to provide professional services for the design and preparation of bid documents and construction support for the design of water pipe replacements along five street segments in the City.

Ed Slintak, PE will serve as the primary contact for this Project. His contact information is as follows:

Ed Slintak, PE | Project Manager
phone (650) 522 2533| [email protected]
We are confident that our team is best suited to deliver this project for the City. Below is a summary of specific reasons why the City should choose CSG as the water main design consultant.

A Proven and Experienced Project Manager & Project Engineer– Ed Slintak, PE, will serve as the Project Manager for this contract. Mr. Slintak brings over 35 years of municipal and civil engineering experience, and a deep understanding of managing and designing subsurface utility improvements throughout San Mateo County. He served as the Project Manager for waterline improvements in the Town of Hillsborough, City of Millbrae, and City of Morgan Hill. Matthew Pi, PE, will serve as the Project Engineer. Matthew brings over 12 years of engineering design experience, with a focus in waterline design. Prior to joining CSG, he served as a project manager for Cal Water, overseeing the design and construction of waterlines throughout San Mateo and Santa Clara County.

The Right Experience and City Knowledge– CSG has performed project management and design services for waterline rehabilitation for public agencies throughout the Bay Area. CSG has provided design and construction management services for several CIP projects for the City in addition to assisting with various C3 and mapping reviews. Our team brings a deep understanding of City processes and procedures, City staff, and City topography to this Project.

CSG will team with Quiet River Land Services to perform surveying work, BAGG Engineers to perform geotechnical services, and Subtronic Corporation for underground utility investigation. CSG has partnered with these firms for previous projects.

CSG acknowledges receipt of Addendum 1 and 2.

We are excited about the opportunity to serve the City of Daly City and would welcome the opportunity to talk with you further. If you have any questions or need additional information, please contact Mr. Slintak at [email protected] or (650) 522-2533.

Sincerely,

Cyrus Kianpour
President, CSG Consultants, Inc.
1 S E C T I O N

Page 100 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 2 Profile and Project team
For the past 30 years, CSG Consultants (CSG) has provided civil engineering, project management, and construction management to public agencies throughout California. CSG has expansive knowledge providing the design of and management of water main replacement projects. Provided below is our proposed organizational chart for the City’s review. Resumes of key staff are provided in the Appendix, key staff are indicated with an (*). CSG is committing the staff listed to this project and the City of Daly City.

Project Manager
Ed Slintak, PE, Principal Engineer, will serve as the Project Manager and main point of contact for this project. Mr. Slintak brings over 35 years of municipal and civil engineering experience, and a deep understanding of managing and designing subsurface utility improvements throughout San Mateo County. Notable projects Ed has managed include:
• Millbrae – Ahwanhee Drive Water, Sewer, and Complete Street Repair • Morgan Hill – Barrett Avenue Water and Sewer Mains Project • Hillsborough – Water and Sewer Improvements
2 S E C T I O N
Matthew Pi, PE, NASSCO*
Son Hoang, EIT, NASSCO
Allan Simeon, EIT

CIVIL DESIGN
Quiet River Land Services, Inc.

Surveying
BAGG Engineers
Geotechnical
Subtronic Corporation
Underground Utility Investigation

SUBCONSULTANT
Ed Slintak, PE*

PROJECT MANAGER
Hatem Ahmed, PE, PMP*

PRINCIPAL IN CHARGE
Michael Laderman, PE*

QA / QC

Page 101 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 3 Relevant Experience
Provided below are descriptions of projects that members of the proposed team have completed in recent years.

Ahwahnee Drive Water, Sewer, And Complete Street Repair Project | City Of Millbrae, Ca
Ahwanhee Drive is an approximately 1,600-foot-long street segment located in a hillside residential neighborhood in the City of Millbrae. Due to the aging utility infrastructure and deteriorating roadway pavement, the City initiated a complete street repair project. Utility work as part of the complete street repair project included replacement of the existing sanitary sewer main, reconnection of sewer laterals, installation of new cleanouts and backflows, relocation of the existing water main, and replacement of water services up to the meter where necessary. The project also included rehabilitation of the existing pavement, installation of ADA compliant curb ramps, and spot repairs of concrete curb, gutter, and sidewalk where deficiencies were noted. Finally, the existing streetlights along the corridor were upgraded with new streetlight poles and LED fixtures, new streetlight pull boxes were installed, and a new street light conduit was installed in the roadway. Ed Slintak serves as the Project Manager assisted with Matthew Pi as the Design Engineer and Hatem Ahmed as the Principal in Charge for this Project.

Reference: Bill Giang, Assistant Engineer
621 Magnolia Avenue, Millbrae, CA 94030
(650) 259-2325, [email protected]

Barrett Avenue Water And Sewer Mains Project | City Of Morgan Hill, Ca The Barrett Avenue Water and Sewer Mains Project in the City of Morgan Hill involved upgrading sewer and water facilities. The project area was approximately 4,200 linear feet along Barrett Avenue and the utilities cross under Highway 101 and the Santa Clara Valley Water District’s Madrone Channel. Within this project area, approximately 3,785 LF of 18” replacement sanitary sewer main and 1,940 LF of 16” replacement water main were installed. Trenchless construction methods were designed to install a 30” steel casing for the sewer main and a 24” steel casing for the water main each with a length of 390 LF under the highway and Water District channel. The replacement sewers were installed using pipe bursting, while new water mains were constructed parallel to the existing using traditional cut and cover. Sanitary sewer manholes were modified to conform to the increased pipe size and sewer laterals were reinstated. Water service connections and fire hydrant connections were also reinstated. CSG Consultants prepared the plans, specifications, and estimate for this project, assisted in obtaining permits, and provided construction support. CSG also provided constructability reviews during design. Ed Slintak served as the Project Manager for this Project.

Reference: Lynette Kong, Associate Engineer
17575 Peak Avenue, Morgan Hill, CA 95037
(408) 310-4714, [email protected]

Water And Sewer Improvements | Town Of Hillsborough, Ca CSG, led by Ed Slintak, served as Program Manager for upgrading the Town’s sanitary sewer collection and water system, reporting directly to the Town’s Director of Public Works as well as presented findings, recommendations and status reports to the City Manager and City Council. CSG managed and performed all design work financed by revenue bonds for the Town with a construction value of approximately $15 million.

CSG worked closely with the Town to evaluate and prioritize water facilities most in need of upgrades to be financed by the bond measure. CSG prepared the construction documents for this multi-year program.

Improvements included replacement of two 0.5M gallon water tanks, addition of pump stations to increase fire flow capacity and the replacement of over 7 miles of water mains through the curvilinear hillside streets of Hillsborough. The new mains were primarily 12” cast iron pipes. Meter upgrades and hydrant replacements were also part of the project. CSG also performed Construction Management and inspection functions for the projects.
3 S E C T I O N

Page 102 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 4 CSG engineers managed video inspection of over 100,000 lineal feet of sewer mains, pipe bursting of over 12,000 linear feet and lining with Cured in Place Pipe (CIPP) of over 35,000 feet of pipe. CSG also designed and managed construction of new mains utilizing trenching methods such as a bypass line (Pinehill-Ralston Sewer main) to eliminate sections of sewer main within an active landslide. The approximately $1 million project utilized traditional trenching methods. Ed Slintak served as Project Manager for these projects assisted by Michael Laderman as the QA/QC reviewer.

Reference: Paul Willis, Director of Public Works
1600 Floribunda Ave, Hillsborough, CA 94010
(650) 375-7444, [email protected]

Utilities Program Management | City Of Morgan Hill, Ca
CSG provided program management, design, and construction management services to the City for their $18 million sewer and water improvement program, as part of the City’s bond measure. In addition to program management services, CSG provided the following tasks
• Work with City in preparing each project scope of
work, budget, and schedule.
• Prepare RFP documents for design services per the
City requirements for each project
• Prepare documents required to obtain Authorization
to Proceed with Construction
• Coordinate with other stakeholders/agencies – Santa
Clara Valley Water District, PG&E, Cha rter, and
Verizon/Frontier
• Oversee projects during the planning, design, and
construction phases
• Prepare contract award package per the City requirements • Attend City Council and public meetings and assisting with material preparation for the meetings • Perform construction management for various utility projects • Program and projects control and program close-out
CSG coordinated the design teams of two separate projects (water line and water tank) to help reduce the overall cost of the projects. Hatem Ahmed served as the Program Manager acting on the City’s behave assisted with Ed Slintak and Michael Laderman for design reviews.

Reference: Lynette Kong, Associate Engineer
17575 Peak Avenue, Morgan Hill, CA 95037
(408) 310-4714, [email protected]

Page 103 of 189 ends

CSG PROPOSAL TO THE CITY OF DALY CITY

SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 5 Project Approach, Organization, &
Local Presence
Daly City (City) is proposing to implement the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project (Project) to improve water service, increase water main reliability, reduce water loss and the number of main breaks in the service area. The total length of the project is approximately 1,600 linear feet (LF) and will include both 6” and 8” replacement water main. CSG is highly experienced with design of these types of improvements for
similar projects located in residential streets
utilizing open cut trench method, horizontal
drilling, bore and case and slip-line. CSG is
familiar with the latest American Water Works
Association (AWWA) and Department of
Drinking Water (DDW) standards for water
main installation including Ductile Iron (DI) and
Polyvinyl Chloride (PVC) pipe.

In preparation of this proposal, and to
familiarize ourselves with the Project, CSG has
reviewed the RFP and City Design Standards,
performed a site visit at the project location,
assembled a high-quality team, discussed
internally to determine the best approach, and
developed viable project alternatives.

Santa Cruz Ave and Guadalupe Ave are
residential streets of single-family homes with
approximately 25ft wide roadway width. San Diego Ave is a residential street of single-family homes with an approximate roadway width of 30ft. All streets have gutter, curb and sidewalk on both sides of the corridor with storm drain, sanitary sewer and water main located in the street, except for Guadalupe Ave where storm drain piping is absent. Existing overhead utilities are running along all streets with overhead service connections spanning the entire corridor. Portions of the streets were observed to be recently slurry sealed.

There is an abandoned 30” water main running along San Diego Ave.

CSG recommends the use of open trench method for installation of water main along all three streets and to forgo a pipeline assessment report. Trenchless methods (horizontal directional drilling, pipe bursting, slip-line, bore and case) were evaluated and found to be of no additional benefit in terms of cost savings, improved constructability, or reduced impact to residents and traffic.

Horizontal directional drilling (HDD) and pipe bursting (bursting) were evaluated and found to be disadvantageous for the project. Typically, trenchless methods are used to mitigate potential construction impacts by minimizing excavation area and pavement restoration. For this project, trenchless installation methods will still require additional excavation at each service reconnection and hydrant installation negating potential benefits. Also, due to the limited roadway width and multiple below-ground utilities in the street, HDD and bursting methods pose a risk of colliding with existing utilities or damaging them through vibration.

Vibrations may also damage adjacent resident properties leading to claims.

Slip-lining the existing 30” SFWD main was evaluated and found to be difficult because of the need for extensive penetrations of the main to install service saddles or hydrant connections. Also, the structural integrity of the abandoned main is unknown. Bore and case was evaluated and found to be unnecessary since casings are typically needed for railroad crossings, or areas of heavy truck traffic flow, both of which are not present at the project location. If SFPUC has abandoned all rights to the abandoned pipe, removal of the 30” pipe and placing the new main in its location will be an option, although removal of the pipe will increase construction costs.
4 S E C T I O N