All public record to an open session item on this agenda, which are not exempt from disclosure pursuant to the California Public Records Act, that are distributed to a majority of the legislative body will be available for public inspection at the City Clerk’s Office, City Hall located at 333 90 th Street, Daly City, CA during normal business hours, at the same time that the public records are distributed or made available to the legislative body.
CITY OF DALY CITY
Regular Meeting - CITY COUNCIL
AGENDA
Monday, May 9, 2022 - 7:00 PM
COVID-19 ANNOUNCEMENT - PUBLIC MEETINGS
Pursuant to Government Code section 54953(e) et seq., members of the Daly City Council and staff will participate in this meeting via a teleconference. Members of the public are encouraged to watch the meeting via livestream on the City’s YouTube Channel at https://www.youtube.com/DalyCityVideoMeetings, the City’s agenda website at https://www.dalycity.org/agendas or on local Channel 27 (Comcast).
Public Participation:
There are two ways to submit public comment: (1) send written comments by 4:00 pm on meeting day and (2) join to speak at the meeting via Zoom.
To submit a comment in writing, please email [email protected] and write “Public Comment” in the subject line. In the body of the email, include the item number and/or title of the item as well as your comments. All comments received by 4:00 pm will be emailed to the City Council members prior to the meeting. Those comments received after 4:00 pm will be added to the record and shared with the City Council members following the public meeting. Comments are not read aloud into the record.
To speak at the meeting via Zoom, join at https://bit.ly/dalycitymay9zoom. Zoom will require an email address and name. The name entered will be visible online and will be used to notify you that it is your turn to speak.
You may also join by visiting https://zoom.us/join. Enter meeting ID: 813 7988 5615, then enter email address and name. The May 9, 2022 Regular City Council meeting may also be accessed via telephone by dialing +1 669 900 6833 (Local). Enter the meeting ID: 813 7988 5615, then press #.
When you would like to speak on an item during the public comment portion of the meeting, you will need to use the “raise hand” feature in Zoom. Public comment is limited to two (2) minutes maximum, and speakers may only comment once per item. You must familiarize yourself with Zoom prior to joining the meeting. The City will not be providing technical support.
If you do not wish to speak, the City requests that you watch the livestream of the meeting on the City’s YouTube Channel at https://www.youtube.com/DalyCityVideoMeetings, the City’s agenda website at https://www.dalycity.org/agendas or on local Channel 27 (Comcast).
Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting should call the office of the City Clerk at 991-8078 as soon as possible.
Agenda – City Council
Monday, May 9, 2022
CALL TO ORDER:
PLEDGE TO THE FLAG:
ROLL CALL:
PRESENTATIONS:
1. Proclaiming May 2022 as Wildfire Preparedness Month, Battalion Chief Matt Powers, North County Fire Authority
2. Proclaiming Week of May 15-21, 2022 as Emergency Medical Services Week, Battalion Chief Matt Powers, North County Fire Authority
3. Proclaiming May 2022 as Asian American and Pacific Islanders Heritage Month, Joseph Bautista, Legacy Filipino Martial Arts
4. Proclaiming Week of May 15-21, 2022 as National Public Works Week, Richard Chiu, Director of Public Works
APPROVAL OF MINUTES:
5. Regular Meeting of April 25, 2022
APPROVAL OF AGENDA:
CONSENT AGENDA
All items listed on the Consent Agenda are considered to be routine and may be approved by one roll call vote of the City Council. There shall be no separate discussion of the matters on the Consent Agenda unless requested by a member of the City Council. If discussion is required, that item will be removed from the Consent Agenda and will be considered separately at the end of the Agenda.
Resolutions:
6. Authorizing City Manager to Execute a Professional Services Agreement for Design Services of the 2022-23 Street Resurfacing Project
7. Setting the Time and Place of the Public Hearing for Daly City’s National Pollutant Discharge Elimination System Program Regulatory Fee Set Hearing: 6/13/2022
8. Approving FY 2022-23 Project List for Road Maintenance and Rehabilitation Account Funds Authorized Under SB 1
Agenda – City Council
Monday, May 9, 2022
9. Approving the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue
10. Authorizing City Manager to Execute a Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project
11. Accepting and Appropriating a Grant from the State of California for a Book to Action program, Mutual Rescue
12. Authorizing the City to Implement Teleconferenced Public Meetings Pursuant to Assembly Bill 361
Check Registers:
13. Check Registers for the Month of March 2022
END OF CONSENT AGENDA
PUBLIC HEARINGS:
14. Introduction of Ordinance for Military Equipment Policy (AB481) STAFF: Cameron Christensen
RECOMMENDATION: Open/Close Hearing
Motion for City Attorney to Read by Title Only
Councilmember Introduce Ordinance
PUBLIC APPEARANCES/ORAL COMMUNICATIONS:
NOTE: Speakers are limited to two minutes, unless modified by the Mayor. The Council cannot take action on any matter raised under this item.
APPOINTMENTS: Board/Commission Membership Committee Appointments
REPORTS:
15. Council Committee
16. City Council
17. Staff
ADJOURNMENT:
Proclamation
WILDFIRE PREPAREDNESS MONTH
MAY 2022
WHEREAS, Last year California experienced eight thousand eight hundred thirty-five wildfires burning two and half million acres in the state; and WHEREAS,three thousand six hundred twenty-nine structures were damaged or destroyed by wildfires last year in California; and
WHEREAS, each year, more people move into wildland urban interface areas increasing the need to raise awareness to our citizens on how they can protect their property from wildfire losses; and
WHEREAS, Zonehaven has been adopted as a county wide tool to assist with informed evacuations during wildfire and we encourage “know your zone” before an emergency arises; and
WHEREAS,the North County Fire Authority encourages fire-safe behavior by all who live, work, and recreate throughout the City of Daly City; and WHEREAS,each of us can do our part to prepare for wildfire emergencies by taking steps to make effective changes to our homes and landscapes to reduce the risk of wildfire; and
WHEREAS,if we work together collaboratively and with awareness, we can remain strong and resilient.
NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor and members of the City Council of Daly City hereby proclaim May 2022 as “WILDFIRE PREPAREDNESS MONTH” and encourage all Daly City residents to increase their knowledge and awareness of proper safety measures to protect themselves from the devastating effects of wildfires.
Signed and sealed by the Mayor and City Council of the City of Daly City this 9th day of May 2022.
Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember
Proclamation
Emergency Medical Services Week, May 15-21, 2022
WHEREAS, emergency medical services pre-hospital is a vital public service; and WHEREAS, the North County Fire Authority is ready to provide lifesaving pre-hospital care to those in need 24 hours a day, seven days a week; and
WHEREAS, access to quality emergency pre-hospital care dramatically improves the survival and recovery rate of those who experience sudden illness or injury; and WHEREAS, emergency medical services and pre-hospital care has grown to fill a gap by providing important, out of hospital care; and
WHEREAS, the emergency medical services pre-hospital care system consists of first responders, emergency medical technicians, firefighter paramedics, private paramedics emergency medical dispatchers, firefighters, police officers, educators, administrators, pre-hospital nurses, emergency nurses, emergency physicians, trained members of the public, and other out of hospital medical care providers; and
WHEREAS, the North County Fire Authority engages in thousands of hours of specialized training and continuing education to enhance their lifesaving skills; and WHEREAS, this last year Emergency Medical Services continues to face with unprecedented health and safety challenges due to the COVID-19 pandemic, which resulted in monumental changes in everyday procedures; and
WHEREAS,it is appropriate to recognize the value and the accomplishments of the North County Fire Authority and emergency medical services providers by designating Emergency Medical Services Week.
NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and members of the City Council do hereby proclaim the week of May 15-21, 2022, as EMERGENCY MEDICAL SERVICES WEEK in Daly City with the EMS Strong theme, EMS Rising to the Challenge and encourage the community to observe and honor those who respond to medical emergencies in our communities.
Signed and sealed by the Mayor and City Council of the City of Daly City this 9th day of May 2022.
Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember
Proclamation
Asian American and Pacific Islanders Heritage Month
May 2022
WHEREAS,Asian American and Pacific Islander Heritage Month is a month to celebrate and pay tribute to the contributions of Asian Americans and Pacific Americans to American history, society, and culture; and WHEREAS,Asian American and Pacific Islander Heritage Month originated in a congressional bill in June of 1977. On March 28, 1979, President Carter issued Presidential Proclamation 4650, proclaiming the week beginning on May 4, 1979, as Asian/Pacific American Heritage Week; and WHEREAS,On May 1, 2009, President Obama issued Presidential Proclamation 8369 proclaiming May 2009 as Asian American and Pacific Islander Heritage Month; and
WHEREAS,Asian Americans and Pacific Islanders comprise many ethnicities and languages, and their many achievements embody the American experience; and
WHEREAS,Asian Americans and Pacific Islanders are leaders in all aspects of American life: government and industry, science and medicine, the arts and Armed Forces, education, and sports; and
WHEREAS,AAPI’s are one the fastest growing ethnic populations in the nation with more than 20 million Asian Americans and Pacific Islanders in the United States—approximately 59,716 Asian Americans and Pacific Islanders in the City of Daly City which accounts for 58.2% of the population in the city.
WHEREAS,the Daly City community has benefitted through the cultural richness, diversity, and generosity of its local Asian Americans and Pacific Islanders with its vast diversity of languages, religions, and cultural traditions that continue to strengthen the fabric of American society.
NOW, THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and members of the City Council of the City of Daly City, do hereby proclaim May 2022 as “Asian American and Pacific Islanders Heritage Month” in Daly City to celebrate and pay tribute to the contributions of Asian Americans and Pacific Islanders to American history, society, and culture.
Signed and sealed by the Mayor and City Council
of the City of Daly City this 9th day of May 2022.
Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember
Proclamation
National Public Works Week, May 15 -21, 2022
WHEREAS,May 15 – 21, 2022 is celebrated as National Public Works Week; and WHEREAS, National Public Works Week is a celebration of the dedicated public works professionals who provide and maintain the infrastructure and services collectively known as public works with the 2022 theme of “Ready and Resilient”; and
WHEREAS,Public Works professionals focus on infrastructure, facilities and services that are of vital importance to sustainable and resilient communities and to the public health, high quality of life and well-being of the people of the City of Daly City; and
WHEREAS,these infrastructure, facilities and services could not be provided without the dedicated efforts of public works professionals, who are engineers, managers, and employees at all levels, who are responsible for rebuilding, improving, and protecting our nation’s transportation, water, wastewater and stormwater treatment, public buildings, parks, and other structures and facilities essential for our citizens; and
WHEREAS, it is in the public interest for the citizens, civic leaders and children in the City of Daly City to gain knowledge of and to maintain an ongoing interest and understanding of the importance of public works and public works programs in their respective communities; and
WHEREAS, the health, safety and comfort of this community greatly depends on the efforts and skills of dedicated public works employees; and WHEREAS, so long as the design, construction, operation and maintenance of these facilities works smoothly the people behind the scene are often forgotten.
NOW THEREFORE, I, DR. RODERICK DAUS-MAGBUAL, Mayor, and Members of the City Council of the City of Daly City, do hereby proclaim May 15 – 21, 2022 as NATIONAL PUBLIC WORKS WEEK, in the City of Daly City, and call upon all residents and civic organizations in the community to pay tribute to our public works professionals, and to recognize the substantial contributions they make to protecting our health, safety, and quality of life.
Signed and sealed by the Mayor and City Council
of the City of Daly City, this 9th day of May 2022.
Dr. Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni, Councilmember
Juslyn C. Manalo, Councilmember
Glenn R. Sylvester, Councilmember
CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
--------------------------------
Note on Public Comments: For this meeting, members of the public were encouraged to watch the meeting via livestream and speak at the meeting via Zoom, and/or submit public comments via email to the City Clerk’s Office prior to the public meeting. Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting were instructed to call the office of the City Clerk at 991-8078 prior to the meeting.
Visit https://www.youtube.com/c/DalyCityVideoMeetings to view videos of the City Council meetings
The meeting was called to order by Mayor Daus -Magbual at 7:00 P.M. by video conference call pursuant to Governor Gavin Newsom’s Executive Order N-29-20.
ROLL CALL: Councilmembers Present:
Roderick Daus-Magbual, Mayor
Raymond A. Buenaventura, Vice Mayor
Pamela DiGiovanni
Juslyn C. Manalo
Glenn R. Sylvester
Staff Present:
Shawnna Maltbie, City Manager
Rose L. Zimmerman, City Attorney
K. Annette Hipona, City Clerk
PRESENTATIONS:
Proclaiming April 2022 as National Poetry Month, Daly City Youth Poet Laureate Representative (Victoria Magbilang, Daly City Public Library Associates)
Poetry Reading by Daly City Youth Laureate
(Jescent Marcelino)
Proclaiming May 1, 2022 as Global Love Day
(John Goltz, Vice President, The Love Foundation)
Proclaiming May 2022 as Mental Health Month
(Stephanie Garma Balon and Christi Morales-Kumasawa, Co-Chairs, Filipino Mental Health Initiative, San Mateo County)
APPROVAL OF MINUTES:
Regular Meeting of April 11, 2022
It was moved by Councilmember Sylvester, seconded by Councilmember DiGiovanni and carried to approve the minutes of April 11, 2022.
APPROVAL OF AGENDA:
It was moved by Councilmember Manalo, seconded by Councilmember DiGiovanni and carried to approve the agenda.
CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
2 CONSENT AGENDA:
It was moved by Councilmember Manalo, seconded by Councilmember Buenaventura and carried to approve the consent agenda with the exception of items #6 and #10 which were pulled for further discussion.
Resolutions:
Authorizing City Manager to Execute a Professional Services Agreement for the Vision Zero Community Outreach Project
Director of Public Works Richard Chiu provided background on the program grant in the amount of $50,000 with a 50% local match. The project will do outreach and education of roadway users and will work towards a goal of zero serious injuries and fatalities by year 2035.
It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by voice vote to adopt the following resolution:
Resolution 22-56, Authorizing Execution Of A Professional Services Agreement For The Vision Zero Community Outreach Project
Amending Traffic Regulations to: (1) Install a 15 ft. No Parking (red) zone at the southwest corner of South Hill Boulevard and Bellevue Avenue (TSR 22/33); and (2) Install 57 ft. No Parking (red) zones at the northeast and northwest corners of the drivewa y on Southgate Avenue to Fernando Rivera Intermediate and Thomas Edison Elementary Schools (TSR 22/36)
Resolution 22-57, Establishing Traffic Regulations
Authorizing City Manager to Execute an Amendment to the Professional Services Agreement for the Mussel Rock 2019 Gabion Wall and Stormwater Maintenance Project
Resolution 22-58, Authorizing Amendment #1 Of Professional Services Agreement With 4L eaf, Inc., For Additional Construction Management And Support Services For The Mussel Rock 2019 Gabion Wall And Stormwater Maintenance Project
Authorizing Amendment to the Professional Services Agreement with Tetra Tech, Inc. for Mussel Rock Waste Boundary Investigation for the Mussel Rock Upper Disposal Area
Resolution 22-59, Authorizing Amendment Of Professional Services Agreement With Tetra Tech, Inc. Mussel Rock Waste Boundary Investigation For Mussel Rock Upper Disposal Area
Approving Reclassification of Network Administrator II to Financial Services Manager
Director of Finance and Administrative Services Tim Nevin recommended the reclassification to better align staffing with the identified needs within the Finance Department. Budgeting for the reclassified position will come from the General Fund and will result in an increase of $28,702 to that fund. Mr. Nevin addressed questions on when the reclassified position was last filled, the cost savings from part-time consultant who will be ending their tenure in next fiscal year, and the job responsibilities of the Financial Services Manager.
CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
3 It was moved by Councilmember DiGiovanni, seconded by Councilmember Sylvester and carried by voice vote to adopt the following resolution:
Resolution 22-60, Approving Reclassification Of Network Administrator II To Financial Services Manager In Range U086 Of The Miscellaneous Unrepresented Salary Schedule
Approving the Recovered Organic Waste Product and Recycled-Content Paper Procurement Policy
Resolution 22- 61, Approving The Updated Recovered Organic Waste Product And Recycled- Content Paper Procurement Policy
END OF CONSENT AGENDA
PUBLIC HEARINGS:
HOME Investment Partnerships-American Rescue Plan (HOME-ARP) Allocation Plan
Housing and Community Development Supervisor Betsy ZoBell provided information on the HOME-ARP funds, a special, one-time allocation targeted to reduce homelessness and increase housing stability across the country. The City received a one- time allocation of $1,411,179 in HOME -ARP funds and must develop a plan approved by HUD. Based on analysis and outreach, staff has drafted a plan which envisions use of $1,199,503 in funds to support the development of affordable housing , specifically for extremely low-income households. Ms. ZoBell addressed questions on whether any funding will go towards housing for veterans and which households are targeted by the funding.
It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried to open the public hearing. There were no speakers on this matter.
It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following resolution:
Resolution 22-62, Approving The HOME-ARP Allocation Plan
City’s HUD Consolidated One-Year Action Plan for Fiscal Year 2022-23
Senior Management Analyst Lenelle Suliguin provided background on HUD’s requirements to receive Federal funds and discussed the public participation and outreach conducted by staff regarding these funds. Ms. Suliguin reported on the March 10 th CDBG Advisory Committee and presented the recommended funding allocations of the CDBG (approx. $1.3 million) and HOME funds (approx. $389k); these recommendations represent an opportunity to help lower income Daly City families and individuals.
Ms. ZoBell and Ms. Suliguin addressed questions on the Rehabilitation Program, Rehabilit ation loan payments and allocation amounts for Public Service Programs.
It was moved by Councilmember DiGiovanni, seconded by Councilmember Sylvester and carried to open the public hearing. There were no speakers on this matter.
It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following resolution:
CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
4 Resolution 22- 63, Approving The City’s One -Year Action Plan For Fiscal Year 2022 -2023 (July 1, 2022 Through June 30, 2023)
ORDINANCES:
Second Reading, Ordinance No. 1457, Amending Title 17 of the Daly City Municipal Code, Re:
Locational Standards for Smoke Shops
City Attorney Rose Zimmerman provided the second reading of the subject ordinance and clarified the ordinance was publicly noticed in the newspaper prior to the first and second readings.
It was moved by Councilmember Manalo, seconded by Vice Mayor Buenaventura and carried by unanimous roll call vote to adopt the following ordinance:
Ayes: Buenaventura, Daus-Magbual, Manalo
Noes: DiGiovanni, Sylvester
Ordinance 1457, Amending Title 17 of Daly City Municipal Code Re: Locational Standards for Smoke Shops and Tobacco Stores
PUBLIC APPEARANCES:
Call-in User1, the Public, referred to the proclamation on mental health, requesting a reduction in law enforcement by 10% . The public requested de -escalation in law enforcement, acknowledged Officer Dante, requested more mental health facilities and social workers, and reported on the increase in BART’s mental health clinicians.
Call-in User2, Jim Lawrence, Chair of San Mateo County Fixin’ , supported enacting a Civilian Oversight Board & Inspector General’s Office for San Mateo County Sheriff’s Office. Fixin’ urged the Board of Supervisors to install the Oversight Board for public transparency into the county governmental office, to gain community trust, to ensure fair treatment, to have good governance and accountability for the people’s tax dollars.
Michelle questioned the need to have public funding for housing and stated it is in the best interest of citizens to have a private property ownership solution.
REPORTS:
Council Committee
Peninsula Clean Energy (PCE) (Daus-Magbual)
City Council
Councilmember Manalo commended Jefferson Elementary School District for their All-Electric Leader Award from PCE. Councilmember Manalo joined the Community Passover Seder in San Francisco to observe the annual communal holiday. Councilmember Manalo thanked the Mayor for ensuring the City had the Ukrainian flag-raising at City Hall to display its anti-war sentiments.
CITY OF DALY CITY
MINUTES – REGULAR MEETING - CITY COUNCIL
APRIL 25, 2022
5 Councilmember Manalo volunteered with the DC Host Lions Club at the Spring Fun Day Event and commended Recreation staff and Recreation Services Manager Denise Brown for all their work; Councilmember Manalo also acknowledged her family, County Supervisor David Canepa and family, and the various small businesses and vendors who were in attendance at the event. Councilmember Manalo commended the return of senior programs at Doelger Café and commended older adults who are staying active through these programs.
Councilmember DiGiovanni acknowledged State Assembly Pro Tem Kevin Mullin and Phil Ting for having a resolution to recognize the 107th-year remembrance of the Armenian genocide and acknowledged Congresswoman Jackie Speier’s family members who perished in the genocide.
Councilmember DiGiovanni commended Recreation staff on their work for Spring Fun Day; Councilmember DiGiovanni acknowledged the Explorers, the Police Department staff, Westlake Students, volunteers and youth who were in attendance. Councilmember DiGiovanni reported on programs returning for seniors at Doelger Senior Center and commended Active Adult/Senior Services Supervisor Cooney, Recreation Services Manager Brown and City Manager Maltbie.
Mayor Daus-Magbual congratulated Jefferson Elementary School District on receiving the 2022 All-Electric Leader Award for Outstanding Commercial Project, the first workforce campus for grades K-8 in California. Mayor Daus-Magbual invited all to attend the Youth Poet Laureate Commencement at City Hall on Thursday, April 28, which will feature performances from the youth finalists and resident Poet Laureate Aileen Cassinetto. Mayor Daus-Magbual provided a reminder for Love Daly City Event on April 30 and the upcoming Annual Earth Day recycling events on May 7; both will be held at City Hall.
Mayor Daus-Magbual acknowledged Project Green Space’s upcoming event to plant trees in the Bayshore neighborhood and commended Assistant to the City Manager Leilani Ramos for CLEAN Daly City; the Mayor announced various opportunities for clean-up in Daly City neighborhoods and parks.
ADJOURNMENT:
Mayor Daus-Magbual adjourned the meeting at 9:15 PM in memory of Michael Burton, Barbara Reagan Davis, Brandon Cheese, and Isaako Poti, Sr.
Approved as submitted, this 9th
City Clerk
day of May , 2022.
Mayor
City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Authorize the City Manager to Execute a Professional Services Agreement for Design Services of the 2022-23 Street Resurfacing Project Recommended Action
Staff recommends that the City Council authorize the City Manager to execute an agreement and any necessary amendments, in an amount not to exceed $300,000.00, for professional services with NCE of Point Richmond, California, to provide engineering design services for the 2022-23 Street Resurfacing Project.
Background
The street resurfacing project complements the City’s annual street slurry seal program to help Daly City maintain its pavement condition index (PCI). Whereas the annual slurry seal program cost-effectively extends the useful life of streets in fair and good conditions, the resurfacing projects perform more extensive pavement rehabilitation work to restore streets that are in poor condition.
The 2022-23 Street Resurfacing project includes pavement rehabilitation for streets located in the Hillside, Bayshore, Skyline, St. Francis, and Serramonte neighborhoods. The streets to be rehabilitated were selected through a comprehensive evaluation of the City’s Pavement Management Program, recommendations from the Street Maintenance Division, coordination with other planned City projects, and availability of funds.
The rehabilitation work will include base failure repair, asphalt concrete (AC) overlay, and other reconstruction treatment options as determined by the consultant during design. ADA curb ramps within the limits of work will be evaluated and if found to be deficient, will be reconstructed to meet current federal ADA requirements. Approximately 2.2 centerline miles of roadway will be restored with the project as shown on the attached location map.
Discussion
Staff released a Request for Proposals (RFP) for pavement engineering services on March 8, 2022, to eighteen firms from the City’s 2021 General Engineering Services short list with expertise in pavement design. Proposals were received from three firms and a panel consisting of staff from the Public Works department evaluated the proposals on their technical merits. The panel determined NCE has the experience and qualifications that meet the needs of the project.
The scope of work under this professional services agreement includes the following:
1. Coordinate with utility agencies to avoid potential construction delays and unnecessary disruptions to public services;
Authorize the City Manager to Execute a Professional
Services Agreement for Design Services of the 2022-23
Street Resurfacing Project
Meeting Date: May 9, 2022
2. Perform pavement condition surveys of each street section based on distresses concurrent with field testing;
3. Collect core samples of street pavement sections;
4. Perform pavement analysis and design services, and develop pavement rehabilitation treatment recommendations;
5. Prepare design plans, specifications, and cost estimates (PS&E) for construction;
6. Provide bid and construction support services; and
7. Survey and design ADA curb ramps.
Fiscal Impact
The professional services agreement with NCE provides for a not-to-exceed amount of $271,200 for the design of the 2022-23 Street Resurfacing project. An additional $28,800 (10%) is needed for design contingency for a total cost of $300,000.
Sufficient Funds are available in the FY 2021-22 Transportation Fund Project Accounts 17-312- 918 (2021-22 Street Resurfacing) and 17-312-919 (2022-23 Street Resurfacing) to fully fund this professional services contract.
Summary/Conclusion
Staff recommends that the City Council authorize the City Manager to execute an agreement and any necessary amendments, in an amount not to exceed $300,000.00, for professional services with NCE of Point Richmond, California, to provide engineering design services for the 2022-23 Street Resurfacing Project.
Staff is available to provide any additional information desired by the Mayor or Councilmembers.
Respectfully submitted,
Roland Yip Richard Chiu, Jr.
Senior Civil Engineer Director of Public Works
Attachments: Project Location Map
NCE Professional Services Agreement
2022-23 STREET RESURFACINGPROJECT LOCATION MAPSAN MATEO COUNTY, CALIFORNIACITY OF DALY CITY 10000500FEET
-1-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
AGREEMENT WITH NCE
FOR DESIGN PROFESSIONAL SERVICES
FOR
City of Daly City
This Agreement, made and entered into this ____ day of __________, 2022 (the “Effective Date”) by and between the CITY OF DALY CITY, a municipal corporation existi ng under the laws of th e State of California (”CITY"), and NCE, a California S-Corporation ("CONSULTANT"):
NCE
501 Canal Blvd, Suite I
Point Richmond, CA 94804
R E C I T A L S :
A. CITY desires certain construction document services hereinafter described as t he design services for the 2022-23 Street Resurfacing Project.
B. CITY desires to engage CONSULTANT to provide these consulting services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreeme nt, the proposal from NCE dated April 18 th, 2022, attached and
incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnis hed by CONSULTANT un der this Agreement. CONS ULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furnish the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
-2-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documen ts submitted by CONS ULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT'S work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on the Effective Date and be completed within two (2) years.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A , CITY agrees to pay CONSULTANT , on a time and materials basis, pursuant to rates stated in Exhibit A to this Agreement, attached and incorporated by reference . In no event shall CONSULTANT ’s total compensatio n under this Agreement exceed two hundred seventy one thousand two hundred dollars ($271,200).
SECTION 6 – TERMINATION
Without limitation to s uch rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY'S payment of the amount require d to be paid, document s become the property of CITY, and CONSULTANT shall transfer them to C ITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents pre pared by CONSULTANT in the perf ormance of this Agreement , al though instruments of professional service, are and shall be the property of CITY, whether t he project for which they are made is executed or not.
SECTION 8 - INDEPENDENT CONTRACTOR
It is unders tood that Consultant, in the pe rformance of the work and ser vices agreed to be performed, shall act as and be an independent contractor and shall not ac t as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or othe r benefits which ac crue to City 's empl oyees, and Consultant hereby expressly waive s any claim it may have to any such rights.
-3-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 9 - CONFIDENTIALITY
All reports and documents prepared by CONSULTAN T in connection with the performance of this Agreement are confidential until releas ed by CITY to the public. CO NSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.
SECTION 10 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 11 – USE OF SUBCONSULTANTS
CONSULTANT shall not s ubcontract any services to be performed by it under this Agreement without the prior written approval of the CITY, except for service firms engaged in drawing, reproduction, typing, and printi ng. CONSULT ANT shall be solely responsible for reimbursing any subconsultants and the CITY shall have no obligation to them.
SECTION 12 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent CONSULTANT as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 13 – SB 1383 COMPLIANCE
To the extent applicable, CONSULTANT shall comply with the requirements set forth in SB 1383 and Public Contracts Code Section 22150 for the procurement of recycled paper products.
To the extent that the fitness and quality are equal, CONSULTANT shall purchase recycled products, as defined in Public Contracts Code Section 12200 instead of nonrecycled products.
Upon completion of the term of this Contract, CONSULTANT shall provide records to the CITY demonstrating compliance with this section, including copies of all invoices, receipts, or other proofs of purchase that detail the procurement of paper products.
SECTION 14 - INDEMNITY
To the fullest extent per mitted by law (including, without limitation, Califor nia Civil Code Sections 2782 and 2782.6), Consul tant and Consultant’s sureties agree to reimburse the apportioned costs to defend (with legal counsel acceptable to the City), indemnify and hold harmless the Ci ty, its officers, agents, off icials, representatives , employees and volunteers
-4-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
(collectively “Indemnitees”) from and ag ainst any and all claims, demands, actions, losses, pure economic damages, injuries, and liability, direct or indirect (including , court costs, a ttorneys’ fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation), to the extent caused by the gross negligence, recklessness, or willful miscon duct of Consultant, any Subconsultant, anyone directly or indirectly employed by them, or anyone that they control (collectively “Liabilities”). Such obligations to defend, hold harmless and indemnify a ny Indemnitee shall not apply to the extent that such Liabilities are arise out of the sole negligence, active negligence, or willful misconduct of Indemnitee.
Acceptance by the City of the work performed under this Agreeme nt does not operate as a release of Consultant from such professional responsibili ty for the work performed pursuant to this Agreement.
The duty of Consultant and its sureties to indemnify and hold harmless as set forth above, shall include the duty to defend as set forth in Section 2778 of the California Civil Code, provided, however, that nothing herein s hall be construed to require the Consultant to indemnify the City, its subsidiary districts, its officers, agents or employees against any responsibili ty for liability in contravention of Section 2782 of the California Civil Code.
Consultant and its sureti es expressl y and specifically agree to waive any and all subrogation rights it may have against the City, its subsidiary districts, offic ers or employees.
Indemnification and waiver of subrogation contained in this section shall remain operative and in full force and effect regardless of any termination of this Agreement.
SECTION 15 - INSURANCE
CONSULTANT shall procure and maintain for t he dura tion of the contract a nd three years thereafter (five years for building or major improvements) insurance again st claims fo r injuries to persons or damages to prope rty which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONSULTANT , his agents, representatives, employees or subcontractors.
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, inclu ding products -completed operations, personal & adver tising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/lo cation or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering a ny auto (Code 1), or if CONSULTANT has no owned autos, hired, (Code 8) and non -owned autos ( Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
-5-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
3. Workers’ Compensation: as required by the State of California, with S tatutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be e ntitled to coverage for the higher li mits maintained by the CONSULTANT.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONSULTANT including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.
Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of an y right to subrogation whi ch any insurer of said CONSULTANT may acquire against the City by virtue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and
-6-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Claims Made Policies (note – should be applicable only to professional liability, see below) If any of the required policies provide claims-made coverage:
1. The Retroactive Date mu st be shown, and must be before the date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided fo r at least five (5) years after completion of the contract of work.
3. If coverage is canceled or non-renewed, and not replaced with another claims -made policy form with a Retroa ctive D ate prior to the contr act Effective Date, the CONSULTANT must purchase “extended reporting” cover age for a minimum of five (5) years after completion of work.
Verification of Coverage
CONSULTANT shall furnish the City with original certificates and amendatory endorsements or copies of the applicabl e policy langua ge effecting coverage required by thi s clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the r equired documents prior to the work beginning shall not waive the CONSULTANT’s obligation to provide them. The City reserves the right to require complete, certified copies of a ll required insurance policies, including endorsements required by these specifications, at any time.
SECTION 16 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, a ssigned, or subcontracted by CONSULTANT without the prior written consent of CITY.
SECTION 17 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the profes sional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to t hus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from sa id obligation.
-7-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 18 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordi nance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subs equent breach or violation of the same or of any other term, covenant, c ondition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become d ue hereunder shall not be deemed to be a waiver of any preceding b reach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 19 – SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceab le by a court of competent jurisdiction, t he remaining provisions of this Agreement shall continue in full force and effect.
SECTION 20 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing par ty in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of t he number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of a n action, or actions to enforce the provisions of this Agreement.
SECTION 21 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal em ployment opportunity. Neither CONSULTANT nor any of its subconsul tants shall discriminate in the emp loyment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupati onal qua lification pursuant to the California Fair Employment and Housing Act.
SECTION 22 - MEDIATION
Should any dispute arise out of this Agreement , any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; i n the absence of an agreement, the parti es shall each submit one name from mediators listed by either the American Arb itration Association, the State Mediation and Conciliation Service, or other agreed -upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the
-8-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
prevailing party. No part y shall be permitted to file a legal action w ithout first meeting in mediation and maki ng a good faith attempt to reach a m ediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement i s reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.
SECTION 23 - LITIGATION
CONSULTANT shall testify at CITY'S request if li tigation is brought against CITY in connection with CONSULTANT'S services under this Agreement. Unless the actio n is brought by CONSULT ANT, o r is based upon CONSULTANT'S wrongdoi ng, CITY shall compensate CONSULTANT for preparation for testimony, testimon y, and travel at CONSULTANT'S standard hourly rates at the time of actual testimony.
SECTION 24 - NOTICES
All no tices hereunder shall be giv en in writing and mailed, postage pr epaid, addressed as follows:
To CITY: City Engineer
City of Daly City
Public Works – Engineering Division
333 90th Street
Daly City, CA 94015
To CONSULTANT: J. Ryan Shafer, PE, GE
NCE
501 Canal Blvd, Suite I
Richmond, CA 94804
SECTION 25 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotia tions, representations, and a greements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and CONSULTANT.
-9-
Revised 02/10/22
G:\Projects\Street Resurfacing\2022-23 Street Resurfacing\Design Folders\15-Design Consultant\03-Agreement\2022-2023 Street Resurfacing Professional Services Agreement.doc
SECTION 26 – AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authorit y to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have s igned this Agreement have the legal power , right, and authority to make this Agreement and to bind each respective party.
SECTION 27 - GOVERNING LAW AND VENUE
This Agreement sha ll be go verned by the l aws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
IN WITNESS WHEREOF, CITY and CONSULTANT hav e executed t his Agreement the day and year first above written.
CITY OF DALY CITY CONSULTANT
NCE
_______________________________ _________________________________ Shawnna Maltbie J. Ryan Shafer, PE, GE
City Manager Principal-in-Charge
APPROVED AS TO FORM
_______________________________
Rose Zimmerman
City Attorney
City of Daly City
PROPOSAL
2022-2023 Street Resurfacing Project
Revised - April 18, 2022
Submitted By:
Point Richmond Office
501 Canal Blvd., Suite I
Point Richmond, CA 94804
Phone: 510.215.3620
Richmond, CA
501 Canal Blvd., Suite I
Richmond, CA 94804
(510) 215‐3620
April 5, 2022
Hillary Tung, Engineer I/Project Manager
City of Daly City
Public Works Department – Engineering Division
333 90th Street
Daly City, CA 94015
(650) 991‐8165
Proposal sent via email to: [email protected]
RE: Proposal for the 2022‐2023 Street Resurfacing Project Dear Ms. Tung and Members of the Selection Committee:
NCE and NCE’s proposed Project Manager, Victor Lemus, PE, recognize the importance and impacts pavement resurfacing/rehabilitation projects can have on a City and its residents. With over 256 centerline miles of roadway, the City’s pavement network represents a significant asset that is highly visible and important to the community and local businesses, and therefore requires good decision making as to how to best manage and maintain. Having worked with the City in a pavement resurfacing project back in 2016‐2017, NCE’s goal is to continue to partner with the City to deliver pavement rehabilitation and civil design documents that balance long‐term pavement performance and sustainability, cost‐effective design and construction, future maintenance, ADA compliance, and minimal traffic disruptions during construction.
NCE is a multi‐faceted civil engineering, pavement engineering, landscape architecture, and environmental service firm, which specializes in developing and designing pavement maintenance and resurfacing/rehabilitation programs for public agencies all throughout California. NCE is a powerhouse known for delivering comprehensive multi‐year pavement work plans and civil engineering projects involving pavement management and value engineering, pavement resurfacing/rehabilitation, road reconstruction, complete streets elements, and green infrastructure solutions.
NCE has successfully completed multi‐year work plan updates, pavement resurfacing/rehabilitation, reconstruction programs, and civil design for municipalities throughout the Metropolitan Bay The NCE team provides the following benefits and distinguishing features to deliver the City’s project:
Proven History with Bay Area Agencies – NCE has dedicated staff and a large team of professionals to successfully complete pavement resurfacing, rehabilitation, and reconstruction projects for in the Bay Area for over 15 years, which is comprised of over thousands of centerline miles of streets.
Knowledge of Daly City – NCE worked with the City back in 2016 to develop the Junipero Serra Boulevard, Geneva Avenue, and San Pedro Road Pavement Rehabilitation Project.
Pavement Expertise – Pavement management, research and design expertise to prioritize and structurally evaluate pavements to develop customized treatment strategies.
Qualified Staff – Highly qualified, responsive staff with proven experience in all facets of engineering, including civil and pavement, with the ability to work as a partner and extension of City Staff. In addition, NCE staff are industry leaders in ADA design and pedestrian and bicycle solutions.
Highly Focused on Supporting Municipalities – About 85% of NCE’s clientele is within the public sector, which includes current on‐call contracts with many California agencies supporting the delivery of Public Works projects.
Local Regulatory Requirements – NCE has familiarity with local regulations as well as working with many Metropolitan Bay Area cities, utilities, and communities.
Richmond, CA
501 Canal Blvd., Suite I
Richmond, CA 94804
(510) 215‐3620
NCE’s Representative Leads
The NCE team will be led by proposed Project Manager, Victor Lemus, PE, who will be responsible for day‐to‐day project management as well as communicating/coordinating regularly with the City. Victor is known for his expertise leading and managing street rehabilitation projects with varying degrees of complexity from simple surface residential seal programs to large and intricate rehabilitation and complete street project on arterial streets. He currently serves as Project Manager and/or Civil Design Lead on large, multi‐discipline street rehabilitation projects including most recently South San Francisco ($17 million street program), San Mateo, and Pacifica requiring complete street elements and complicated ADA improvements at NCE. Victor is highly adept at managing projects and he will work closely with a highly qualified interdisciplinary cohesive team of professionals that have previously worked together on similar projects involving infrastructure, roadway, and pavement engineering design. In addition, he was on the NCE engineering design team for the City of Daly City’s 2016 Street Resurfacing Project. Victor will be supported by J. Ryan Shafer, PE, GE, Principal of NCE’s Richmond office. Ryan will provide project oversight and will be responsible for ensuring the resources required for the completion of this project are met. He is an experienced Principal and Project Manager that is known for his ability in managing, overseeing, and providing oversight on all aspects of pavement management, rehabilitation, reconstruction, and complete streets.
Contract Manager and Proposal Contact Information
As a Principal of NCE, J. Ryan Shafer, PE, GE, is authorized to negotiate and contractually bind the firm to the City’s agreement. NCE’s proposed Project Manager, Victor Lemus, PE, will be the primary point of contact for clarifications that may arise during the proposal evaluation period. Their contact information is as follows:
Authorized to Bind Company Project Contact NCE Local Office Mr. J. Ryan Shafer, PE, GE Mr. Victor Lemus, PE 501 Canal Blvd, Suite I Principal‐in‐Charge Project Manager Richmond, CA 94804 Phone: (510) 215‐3620 Phone: (510) 215‐3620 Phone: (510) 215‐3620 Email: [email protected] Email: [email protected] Fax: (510) 215‐2898 Required Statements
This proposal shall remain effective for ninety (90) days from beyond the date of this submittal. In addition, NCE acknowledges receipt of Addendum No. 1 and No. 2 dated March 24, 2022, and April 1, 2022, respectively.
The NCE team is committed to the City and the success of your pavement engineering projects. We are very interested in continuing our working relationship with the City to deliver this project. NCE looks forward to your favorable review of our proposal and the opportunity to work again with the City of Daly City.
Sincerely,
NCE
Victor Lemus, PE J. Ryan Shafer, PE, GE
Project Manager Principal
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | iii
Table of Contents
Cover Letter
1) Implementation Plan .................................................................................................................................................... 1 2) Experience and History ............................................................................................................................................... 12 3) Organization Chart ..................................................................................................................................................... 19 4) Fee Schedule ............................................................................................................................................................... 39 5) Preliminary Sheet List and Technical Specifications Sections .................................................................................... 43 6) Required Statements .................................................................................................................................................. 43
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | 1
1) Implementation Plan
Project Understanding
As part of the 2021 Engineering On‐Call, Daly City (City) is seeking a consultant to complete pavement and civil design services for their 2022‐2023 Street Resurfacing Project (Project). Like many public agencies the City is wanting to pave the greatest number of streets and strike the right balance between cost, performance, and impacts to the public. Our staff understand this and are prepared to discuss and present a number of cost‐effective pavement treatment alternatives based on field investigation and observed pavement conditions. NCE has experience with conventional overlay and reconstruction methods and alternative cost recycle in‐place technologies that offer up cost savings, such as Full Depth Reclamation (FDR) and Cold In‐place Recycling (CIR). Based our initial field review and NCE’s knowledge of unit costs based in the Bay Area for pavement treatments, it appears the expected project will be on the order of $2.8 million in construction.
The planned streets to receive resurfacing are shown in the attached street list which shows pertinent street features. In general, the streets are mostly comprised of residential streets totaling about 2.3 miles. NCE conducted a preliminary street review to better understand pavement conditions and develop preliminary treatments for the purposes of refining the scope of work. In the attached table we provided preliminary pavement treatments for each street section along with preliminary field review notes summarizing pavement conditions, the number of curb ramps that are not ADA compliant and need replacement, and anticipated construction cost per street. From the PCI scores provided in Table 1 and the field review we expect the subject streets to be mostly candidates for resurfacing (mill and overlays or surface reconstruction) and a few reconstruction sections.
Streets that have pervasive pavement failures and fatigue cracking should be carefully evaluated for reconstruction based on pavement section measurements and subgrade characterization. Street reconstruction can be very costly, highly impactful, and introduce utility conflicts. It is important to limit depth of treatment/excavation, when possible, with surface reconstruction that removes old and tired pavements with a new asphalt section that utilizes the existing base materials. If surface reconstructs are not feasible based on insufficient thickness of remaining base materials or problematic subgrade, reconstruction of the pavement structure may be required including consideration of full depth AC, conventional reconstruction with asphalt concrete and aggregate base, and cost saving FDR.
For example, Belcrest Avenue (see figure to the left) is candidate for reconstruction and possibly FDR given the pervasive base failures in combination with heavy traffic load (i.e., Bus 110 route) and evidence of pumping in base of subgrade materials.
This section was surface sealed before without base repairs, and reflective cracking was observed along the entire section. The FDR treatment would pulverize the existing pavement section and mix with cement additives to provide a stable base material upon which to place a new asphalt concrete wearing course. The FDR method recycles the materials in‐situ and can offer significant cost savings over conventional roadway reconstruction techniques. It is generally cost‐effective for areas as little as 25,000 sf.
Belcrest Avenue ‐ FDR
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 2
Edgemar Street between Mar Vista Drive and the end is a lower traffic street and a potential candidate for surface reconstruction (SR) and subgrade recompacting (see figure to the right). More than 80% of pavement area exhibited medium to high severity fatigue cracking with weathering and raveling.
Surface reconstruction includes removing the entire asphalt section and part of the base, recompacting the existing base materials, and then placing a new asphalt concrete pavement section suitable for residential traffic including garbage trucks and have a stable base for a new overlay. This process is ideal for sections with thinner asphalt sections with underling sufficiently thick aggregate base section and will be more cost‐ effective than mill and fill if the base repair percentage exceeds 30 to 40% of the total area. In addition to being more cost effective a surface reconstruct offers additional benefits including given less disruption to residents, reduced utility conflicts, ability to provide a new asphalt pavement section more suitable to heavier loads from garbage trucks, and from a sustainability perspective the ability to re‐use existing roadway base materials. A typical assumption for SR streets is that final paving grades will match approximately the existing grades.
Several street sections may also be candidates for surface seals to reduce treatment costs, which we can discuss further given that this is predominantly a rehabilitation project or possibly deferring to the City’s surface seal program. An example is Carter St (picture shown to the right) with a PCI of 51 and existing field conditions show only minor cracking and base repair percentages less than 5% of the total area. This section would be better suited for a cape seal or microsurfacing and these treatments would provide a more cost‐efficient solution than a more involved and costly rehabilitation or reconstruction alternative.
NCE will provide civil engineering and pavement design services in accordance with the following tasks.
Key Assumptions
Based on delivery of a similar project with the City and in order to deliver the most cost‐effective design strategy, we have made the following key assumptions:
City’s Responsibilities
NCE has assumed that the City will be able to provide the following:
1. Provide information regarding utilities (i.e., sanitary sewer and storm drain), ROW and property limits, site features and existing construction as is available from City.
2. Provide project requirements, including design objectives, budget, constraints, and criteria.
3. Provide existing City technical specifications as the basis for developing new technical specifications.
4. Front‐End specifications including General Provisions, Special Provisions, Special Conditions, and Proposal.
5. Provide City Standard Provisions and Standard Design Criteria.
6. Provide electronic files of City cover sheet template, if preferred.
PAVEMENT TESTING AND DESIGN
1. Pavement design will be based on Caltrans Standards with a combination of coring, pavement condition surveys, laboratory testing of subgrade, and observed field conditions depending on rehabilitation strategy.
Edgemar Street ‐ Surface
Reconstruction
Carter Steet ‐ Surface Seal
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 3
2. Pavement coring will be performed on all street sections with spacing criteria and bulk samples as follows:
a. Pavement cores will be obtained approximately every 1,000 to 1,500 feet and a minimum of 2 cores per street section, unless section length is less than 500 feet only one core may be obtained. b. A minimum of one bulk sample of subgrade will be obtained per street section for those sections preliminarily identified as surface reconstruct or full‐depth reclamation (FDR) for laboratory testing including R‐value, Plasticity Index, and Moisture Content. The potential surface seal or mill and overlay sections will be assumed to not require bulk samples as subgrade investigation is typically not needed for these treatments.
c. AB thickness will be measured at all coring locations either at bulk sample locations (8” diameter core) by direct measurement or by using Dynamic Cone Penetrometer (DCP) at the 4” diameter core holes.
3. Base repairs will be measured in length and width to estimate base repair bid quantities for all street sections.
It is the intent that base repair quantities will be for bidding quantity purposes only, and that actual locations will be marked by NCE with City inspectors prior to construction.
4. A no fee encroachment permit will be pulled with the City for all pavement testing.
TOPOGRAPHIC SURVEYING AND BASE MAPS
1. A topographic survey will be completed for each street section from back‐of walk to back‐of‐walk to establish a base map sufficient for developing civil design plans. This will also include record data location of the existing right‐of‐way for the mapping corridor. This is provided in our base fee estimate based on our discussions with the City and request to include a fee estimate with topographic survey of each street section.
TOPOGRAPHIC SURVEYING AND BASE MAPS (ALTERNATIVE)
1. If pavement grades can generally be maintained at the subject street sections, we judge that a more cost‐ effective approach for rehabilitation streets (mill and overlay or surface reconstruction) would be to utilize City or County base/aerial base maps in lieu of topographic surveys. A topographic survey would still be completed for streets requiring reconstruction of the entire pavement structure (e.g., FDR) or regrading and at each of the curb ramps identified on the street list table (59 total). The City may elect to add additional curb ramp locations within the project area, and it is assumed these additions will occur prior to commencing the topographic survey work.
2. Design sheet information for non‐topo streets will be based on field inventories and approximate field measurements to verify items such as utility covers, cross‐slope, street widths and lengths, medians, repair candidates for curb & gutter, and striping.
3. Sections placed onto City or County basemaps (no topo) will be assumed not to require drainage improvements, complex changes in street geometry, or full pavement section reconstruction.
UTILITY COORDINATION AND LOCATION
1. NCE will prepare and distribute utility notification letters to collect facility maps and as‐builts, confirm utility planned work, and notify utilities of the City’s utility cut moratorium on improved streets. NCE will prepare and distribute a second round of letters including utility location information based on ground
penetrating radar (GPR) that is provided for all street sections to solicit feedback and need for utility relocation or adjustments.
2. Utility location will be completed using GPR to field locate and mark utility alignments and approximate depths of utility mains and laterals within all street sections to the extent that GPR methods can detect utilities. Utility location markings will then be included in topographic surveys. This GPR data is for initial planning purposes with utilities and will be provided as a courtesy to utilities to help expedite their assessments. Utilities will be responsible to review their facilities, perform utility Frankfort Street
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 4
potholes, if necessary, to determine if they have a utility conflict that requires adjusting or lowering of their facilities.
3. Utility covers will be inventoried for the purpose of developing bid quantities for adjustment of utility covers.
UTILITY COORDINATION AND LOCATION (ALTERNATIVE)
1. NCE will prepare and distribute utility notification letters to collect facility maps and as‐builts, confirm utility planned work, and notify utilities of the City’s utility cut moratorium on improved streets. NCE will prepare and distribute a second round of letters including utility location information based on ground penetrating radar (GPR) that is provided for only street sections currently identified for reconstruction of the entire pavement section with topographic survey to solicit feedback and need for utility relocation or adjustments.
2. Utility location will be completed using GPR for streets requiring reconstruction of the entire pavement section (e.g., FDR) or require significant changes in grades to field locate and mark utility alignments and approximate depths of utility mains and laterals to the extent that GPR methods can detect utilities. Utility location markings will then be included in their respective topographic surveys. This GPR data is for initial planning purposes with utilities and will be provided as a courtesy to utilities to help expedite their assessments. Utilities will be responsible to review their facilities, perform utility potholes, if necessary, to determine if they have a utility conflict that requires adjusting or lowering of their facilities.
3. Utilities will not be located in alignment or depth in rehabilitation streets (surface reconstruct or mill and overlay).
4. Utility covers will be field located approximately in rehabilitation streets and inventoried for the purposes of placing onto plan sheets and developing bid quantities for adjustment of utility covers.
TRAFFIC STRIPING
1. Traffic striping is assumed to match existing striping.
2. No significant traffic striping changes or design requiring traffic studies or assessment of traffic impacts is planned or included as a part of this scope.
3. Striping plans will be developed, and striping types and quantities will be inventoried for the purposes of developing bid quantities.
TRAFFIC CONTROL PLANS
1. Traffic control plans are not included in scope of work. We have assumed as is typical to have contractor prepare traffic control plans in accordance with project technical specifications and requirements and submit to the City traffic engineering group for review.
CURB RAMPS
1. It is assumed that all non‐compliant curb ramps will be replaced or retrofitted (e.g., detectable warning surface embedded in concrete) in accordance with Caltrans standards for rehabilitation street candidates. Curb ramps will be replaced or retrofitted based guidance from the Department of Justice/Department of Transportation
Joint Technical Assistance on the Title II of the Americans with Disabilities Act Requirements to
Provide Curb Ramps when Streets, Roads, or Highways
are Altered through Resurfacing dated July 8, 2013.
Further clarification on curb ramp replacement
included in this scope of work is as follows:
a. Utility relocations (e.g., utility poles, utility boxes, and drainage inlets) required to construct curb
ramps are not included in this scope of work.
b. All ramp construction shall be within City Right‐of‐ Way.
Surrey Court
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 5
c. Curb ramp design for the purposes of this scope of work includes paving conforms between 1 to 15 feet beyond gutter lip or face of curb, or 2 feet beyond back of sidewalk. d. For curb ramps within hills or steepened grades, curb ramp design shall only extend up to 15 feet in the uphill direction, beyond which is considering chasing the grade.
2. Curb ramps will be field verified to determine the appropriate standard case ramp and NCE will develop a curb ramp detail for those that will require a custom curb ramp.
3. Steep curb ramps will require design iterations at 65%, 95%, and 100% draft design level to determine the most appropriate ramp.
DRAINAGE
1. The project will, to the extent possible and within the context of proposed rehabilitation, address visible drainage issues.
2. No major drainage improvements are assumed for this project requiring significant stormwater drain and pipe alteration and/or reconstruction.
CURB & GUTTER AND SIDEWALK
1. Curb and gutter sections will only be replaced to the extent that it affects pavement treatment (e.g., tree root uplift or settlement) or to improve drainage.
2. Sidewalk replacement is not included in this scope of work but can be added if required for additional scope and fee.
3. The purpose of our services will be to provide civil and pavement engineering design in support of the planned project by the City. To accomplish the stated purpose, we propose the following scope of services:
Scope of Work
To accomplish the stated purpose, we propose the following scope of services:
Task 1 – Project Management & Meetings
SUBTASK 1A: PROJECT KICK‐OFF MEETING/PROGRESS MEETINGS
NCE’s Project Manager will arrange a Kick‐Off Meeting with the City to initiate work on the project. The objectives of the Kick‐Off Meeting will be:
Review of the Scope of Work
Establish Lines of Communication
Confirm Deadlines
Establish Project Schedule and Milestones
Define Design and Operation Criteria.
Whether a simple preventative maintenance project or a complex reconstruction project, it is critical to establish effective lines of communication with, and coordination amongst, the various stakeholders from the start to ensure the delivery of a successful project within budget and on schedule. In addition to City Staff (Engineering, Maintenance, etc.), NCE will research and coordinate, as needed, with other agencies such as PG&E, AT&T, Daly City Water and Wastewater Resources, Schools, etc., to identify any potential conflicts, requirements, or design issues early to help minimize delays (and costs) later in the design process or during construction. At the Kick‐Off Meeting, key deliverables for each Task and the Project Schedule will be reviewed and adjusted accordingly to meet City needs.
NCE understands construction costs, particularly the volatile price of materials, which have affected the scope of many similar projects. In order to keep the City aware of overall project costs, NCE will begin developing Preliminary Engineering Cost Estimates as soon as we have developed our engineering design recommendations to closely monitor Frankfort Street
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 6
any potential funding issues, which may develop. During the course of the project, NCE will be seeking to develop the most appropriate and cost‐effective pavement rehabilitation alternatives to stay within the planned project budget and schedule.
Throughout the project, the NCE PM and Technical Lead will be available to attend monthly progress meetings (maximum of 10 up to 1 hour each per staff) and a total of three (3) design review meetings with the City, to maintain good communication and update on project progress. The purpose of the progress meetings will be to identify and resolve any design or funding issues that may surface in a timely manner, present design alternatives and recommendations to City staff, and continue coordination with project stakeholders as necessary.
Subtask 1A Deliverables: Kickoff/Progress Meeting Agendas and Minutes.
SUBTASK 1B: UTILITY COORDINATION
NCE will coordinate with utility agencies early in the design process to help avoid potential construction delays and unnecessary disruptions to public services. Utility coordination will be a critical item to keep utility providers informed about the project and schedule to allow for proper notification and planning should utility providers have planned maintenance projects within the subject street sections and/or need to lower/adjust their utilities to accommodate street rehabilitation and particularly reconstruction. One of the first and earliest items that NCE will complete is sending notification letters to applicable utility providers with a preliminary project schedule for street rehabilitation and reconstruction. This will allow for the earlier notification to allow utility providers to perform maintenance on their facilities prior to moratorium on the street paving area and/or assess their utilities and the possible need to lower/adjust their facilities, which can take up to a year or longer. We will also request utility as‐builts and record drawings for street sections planned for reconstruction.
NCE will also carefully document all utility coordination notifications, conversations, and meetings with utility contacts and information in a matrix format with dates of contacts and mailing detailed in this matrix. Follow‐up will be made for each of the above notifications to confirm receipt. NCE will also keep the City informed of any project delays related to utilities.
Subtask 1B Deliverables: Utility notification letters and Contact List Matrix.
Task 2 – Pavement Rehabilitation Design
The scope of work we would perform under this task consists of the following:
SUBTASK 2A: PAVEMENT AND CURB & GUTTER CONDITION SURVEY NCE will perform a pavement condition survey of each street section based on distresses. The surveys will generally cover the travel lanes. Pavement condition surveys serve the purpose of further refining the appropriate pavement rehabilitation treatments that are developed based on coring and lab testing.
This condition survey will generally note the presence of load related and environmental distresses, such as alligator cracking, longitudinal and transverse cracking, rutting, patches and utility cuts, distortions and depressions as they pertain to developing appropriate pavement treatments. In addition, base repairs percentages will be estimated in the condition survey. Our scope of work and condition surveys do not address issues including but not limited to traffic, safety and road hazards, geometric issues, or short‐term maintenance that should be performed (i.e., pothole that should be repaired).
A visual assessment of all curb and gutters will be included to identify areas where drainage or the adjacent pavement has been compromised. Our scope will limit repair recommendations to only those sections of curb and gutter that are damaged to the extent that they will affect pavement rehabilitation and flowline obstructions. If damaged curb and gutter areas are more extensive than anticipated, it may require additional time to complete, and we will notify the City if more time is required to complete these surveys.
Prior to looking at curb and gutter, NCE will meet with the City and establish condition criteria for assessment and replacement. Based on the criteria established with the City, NCE will then determine what level of curb and gutter replacement will be pursued for design plans and documents.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 7
SUBTASK 2B: PAVEMENT CORING
NCE will collect pavement section core samples (4” – 8” diameter cores) on streets identified under key assumptions at locations determined by NCE. All coring locations will be marked with white paint for utility location by Underground Service Alert (USA). Our current fee estimate assumes up to 28 core locations that we estimate will take 4 days to complete.
For each core sample, NCE will measure and record the thickness and material type (AC or PCC) of each layer encountered in the pavement section, including the presence of any pavement reinforcing fabric. The thickness of aggregate base (AB) will be measured at all coring locations either at bulk sample locations (8” diameter core) by direct measurement or by using Dynamic Cone Penetrometer (DCP) at the 4” diameter core holes. We will collect bulk samples of subgrade materials in accordance with key assumptions for laboratory testing such as R‐value, moisture content, and Atterberg Limits (plasticity index) determinations, to support new pavement structural section designs. Our current fees assume up to 12 bulk samples of subgrade will be obtained for testing only for those sections preliminarily identified as surface reconstruct or full‐depth reclamation (FDR).
The core holes will penetrate through the pavement section and will then be backfilled with the excavated materials and capped with AC cold patch on asphalt streets. NCE will then compile the coring and laboratory data and append it to its Pavement Design Memorandum. Each core sample will be logged and stored at NCE’s office and retained through the duration of the project including construction before they are disposed. Additionally, NCE will apply for and obtain a no‐ fee Encroachment Permit from the City prior to starting the coring. NCE will also provide traffic control in accordance with the latest standards contained within the Manual of Uniform Traffic Control Devices (MUTCD), as well as any local requirements that exist.
SUBTASK 2C: PAVEMENT DESIGN RECOMMENDATIONS
Using the data obtained in Tasks 2A and 2B, NCE will perform pavement analysis and design services, and develop pavement rehabilitation and reconstruction recommendations for each street section. NCE will perform its analysis in accordance with the Caltrans Highway Design Manual. NCE will develop pavement structural section recommendations expressed in the form of a Traffic Index (TI) that will be provided by the City. NCE will develop recommendations including, but not limited to, the following:
Reconstruction
o Hot Mix Asphalt (HMA) over AB
o Full Depth HMA
o FDR
Conventional Hot Mix Asphalt (HMA) pavement overlays
Warm Mix Asphalt (WMA)
Rubberized Hot Mix Asphalt (RHMA) overlays
Alternative rehabilitation methods (in‐place recycling, mill & fill treatments, etc.) Quantities and treatments of failed pavement sections (base repairs).
NCE will then summarize its recommendations in a Pavement Design Technical Memorandum to the City that, at a minimum, will include the following:
Results of coring, laboratory analyses, and pavement condition surveys Description of testing procedures and analysis performed for the project Recommended alternatives for pavement rehabilitation.
NCE will submit two (2) copies of its draft technical memorandum to the City for initial review. Upon receipt of any comments from the City, NCE will then prepare its final technical memorandum, which will be signed and stamped by NCE’s Pavement Engineer. Two (2) copies of the final technical memorandum will then be provided to the City reflecting any comments on the draft technical memorandum.
Subtask 2C Deliverables: Draft & Final Pavement Technical Memorandums.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 8
Task 3 – Plans, Specifications & Estimates (PS&E)
The work that will be performed during developing design plans, specifications, and estimates (PS&E) are outlined in the subsequent tasks.
SUBTASK 3A: DESIGN DATA GATHERING
NCE will review relevant available data and records from the City as listed in the previous section, public and private utility providers, and other sources that may be appropriate to support the preparation of project contract documents.
These may include, but are not limited to, the City drainage structure inventory maps, aerial photographs of the City; as‐ built street improvement and infrastructure plans, as‐built plans from utility providers, including any preliminary plans for future work that may conflict with this project. The gathered information will be compiled and included in the design.
Based on our review we will identify any data gaps or missing information and provide this information to the City for review and discussion.
SUBTASK 3B: UTILITY LOCATION
Using GPR, NCE’s utility locator will field locate utility alignments and depths for utility mains and laterals for utilities within the streets in accordance with key assumptions (or on select streets if alternative plan is preferred) to the extent that GPR methods can detect utilities. GPR along utility mains will be marked at various locations along each street section, and the accuracy for the electronic depths will depend on the soil conditions and utility material. GPR results can be affected by various factors such as pipe size, depth, and most importantly environmental factors such as soil conditions, rebar, and subsurface ground water. If GPR cannot establish utility alignments and or depths, potholing may need to be completed for additional scope and fee. Traffic control will consist of a 1‐man crew with traffic control arrow board and signs. Items excluded from work are as follows:
Cost of permits and inspection of any kind on this project Night shift or overtime
Certified or stamped traffic control plans
Lane closures
Pressure washing paint marks.
Subtask 3B Deliverables: Marked utility depth and alignments and electronic collection of utility information.
SUBTASK 3C: TOPOGRAPHIC SURVEY
NCE’s Project Surveyor will complete monument/control recovery, field investigation and field surveys sufficient to prepare a topographic mapping product for all streets (or on select streets and all 59 curb ramps if alternative plan is preferred) stated under key assumptions. The mapping shall be compiled at an agreed upon scale with a 1’ contour interval and will be based on the City Datum.
The mapping area shall be a corridor along each of the street sections (or on select streets and all 59 curb ramps if alternative plan is preferred) between the existing back of walk to opposite back of walk, starting and stopping at the designated locations and including through the returns of the terminating streets. In the absence of an existing sidewalk, the survey will extend to 5 feet behind the curb or edge of pavement, or up to the first substantial barrier (wall, fence, etc.), whichever occurs first. Lastly, the mapping will extend 25 feet beyond the curb return up each intersecting side street. The topographic data to be collected is more specifically defined as:
Cross‐sections at 50’ intervals along with detailed surface topography and/or additional spot elevations, as required, defining the longitudinal and cross slope grade breaks. Typically, the cross section will include back of walk, top of curb, flowline and lip of gutter, pavement ¼ point (if one exists), and pavement centerline.
Surveyed locations for significant surface features, such as curbs, gutters, sidewalks, driveways, misc. concrete, pavement, striping, fences, surface utilities, trees, signs, street lights and signals will be included. A structure inventory for sanitary and storm drain facilities reflecting rim elevations, invert elevations, pipe direction and pipe size will be provided for accessible structures within the mapping limit. To the extent visible, our surveyor will obtain a measurement from the top of manhole rim to the top of cone and note any adjustment rings. In no case shall our surveyor enter a manhole to obtain any data.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 9
Location of all surfaces evident of street monumentation within the mapping corridor (for preservation and Record R/W purposes).
Location of underground utility locator markings.
Provide a finished draft topographic survey for each area of work.
Provide AutoCAD Civil3D DTM surface for each street section.
If the alternative plans is selected, survey will also be performed at curb ramp corner locations specified on the street list table (59 total). The City may add additional curb ramp locations within the project area; it is assumed these additions will occur prior to commencing the topographic survey work.
Based upon a combination of record data and any monuments collected during topographic surveying, our surveyor will calculate the record data location of the existing right‐of‐way for the mapping corridor. Additionally, our surveyor will calculate and show the location of each adjoining parcel lot line from record data (assessor’s parcel data, record mapping and apparent lines of occupation). It should be noted this property line data will not be based upon a field survey and should be considered approximate only.
Subtask 3C Deliverables: Topographic survey results.
SUBTASK 3D: 65% PS&E
NCE will prepare the 65% PS&E for the planned pavement resurfacing. The 65% plans will incorporate typical design elements including layout plans for rehabilitation and reconstruction street sections, pavement treatments, right of way parcel lines, preliminary design, wedge grinds, conform grind locations at intersecting side streets, rehabilitation cross sections, curb and gutter repairs, gutter flow line for drainage repairs, and limits of work. The plans will be prepared in AutoCAD 2018 format on 22” x 34” sheets, drawn at a scale of 1”=20’. Rehabilitation plan sheets will include base repair schedules and will show individual base repair locations. Base repairs will be marked in the field on the pavement in white paint and numbered and verified prior to construction. Additionally, a table summarizing base repair areas and estimated quantities will be developed and included on the plan sheets. We also find that this information is particularly useful to contractors when assembling construction bids and schedules, thus resulting in more competitive bids, and to the City for verifying pay quantities during construction.
NCE understands that the City will provide the “Front End” documents and Special Provisions. The Technical Specifications will be prepared in MS Word format and will follow the City’s formatting conventions (CSI MasterFormat 1995 edition). The Technical Specifications and details will reference the City’s standard provisions and 2018 Caltrans Standards (including subsequent updates). NCE will, however, recommend deviating from Caltrans standards where, from our experience, such changes will improve the likelihood of achieving a successful construction project without compromising the integrity of the design. NCE recognizes the value of incorporating Caltrans Standard Specifications in projects such as these, both because these specifications have been developed by an agency that designs and builds a vast amount of highway work, and because most contractors performing public works construction in Northern California are familiar with them. Caltrans, however, has the resources to administer projects quite differently than most local agencies, so NCE advocates modifying the Caltrans Standard Specifications to better fit the abilities, needs, and budgets of municipal agencies.
NCE also believes that an efficient, yet thorough Quality Control/Quality Assurance program is essential for getting the maximum value out of every dollar spent on construction. Projects designed by NCE therefore, contain technical specifications that attempt to optimize the balance between using rigid, but time‐tested, specifications and meeting local agency needs, with the ultimate goal of obtaining the very best value for its clients.
The Engineer’s Cost Estimate will be prepared in MS Excel format and will be based on the most recent construction cost data available to NCE for projects of this type. Because of NCE’s involvement in the design and construction of numerous similar projects throughout California, we are confident in our ability to estimate the construction cost of the City’s project. This initial estimate will then be updated and refined as the design effort progresses.
It is assumed that the City will require a 10‐day review/comment period once the 65% PS&E package is submitted.
Subtask 3D Deliverables: One reproducible copy of 65% plans, technical specifications, and engineer’s estimate.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 10
SUBTASK 3E: 95% PS&E
The 65% PS&E will be revised to incorporate comments received from the City. NCE will meet with the City to review these comments, from which the 95% PS&E will be prepared. NCE will provide a response to each comment that is included in a comment table provided by the City. The 95% PS&E will include additional design information and details typically expected at this stage of completion, such as utility facilities (storm drain and sanitary sewer manholes, water and gas valves, and survey monuments) that will require adjustments to grade, traffic striping, and pavement legends.
The 95% PS&E will then be packaged and submitted similar to the 65% PS&E unless directed otherwise.
The Technical Specifications will be further refined at this stage of the design. We will review and comment on the City’s front‐end documents (bid and contract forms, General Provisions, Special Provisions, etc.), which the City will prepare and provide. The Engineer’s Cost Estimate will also be updated to reflect the revised quantities of work depicted on the plans.
It is assumed that the City will require a 5‐day review/comment period once the 95% PS&E package is submitted.
Subtask 3E Deliverables: One reproducible copy of 65% plans, technical specifications, and engineer’s estimate.
SUBRAKS 3F: 100% DRAFT PS&E
The 95% PS&E will be revised to incorporate comments received from the City. NCE will again meet with the City to review these comments, from which the 100% Draft PS&E will be prepared. NCE will provide a response to each comment that is included in a comment table provided by the City. The 100% Draft PS&E will include all notes and details necessary for bidding. One reproducible copy of the 100% Draft PS&E will then be packaged and submitted similar to the 95% PS&E unless directed otherwise. It is assumed that the City will require a 5‐day review/comment period once the 100% Draft PS&E package is submitted.
Subtask 3F Deliverables: One reproducible copy of 100% draft plans, technical specifications, and engineer’s estimate.
SUBTASK 3G: ISSUED FOR BIDDING PS&E
Upon receipt of the City’s final review comments, the project documents will be finalized for bidding purposes.
A final quantity calculation will be tabulated, and this will be entered into the final Engineer’s Cost Estimate for the project. All final documents will be reviewed, stamped and signed by NCE’s registered civil engineer, and the final PS&E will be delivered to the City in electronic formats.
Subtask 3G Deliverables: One electronic file of the final plans, technical specifications, and engineer’s estimate.
The electronic files for the final construction plans, specifications, and engineer’s estimate will be in AutoCAD 2018, Microsoft Word, and Microsoft Excel, respectively.
Task 4 – Bidding and Construction Support Services
SUBTASK 4A: BID PHASE AND BID PHASE SUPPORT
NCE will provide the City with assistance during the advertisement and bidding periods for the project. This will include providing assistance to the City in attending the pre‐bid meeting, responding to questions received about the project design, and preparation of any addenda and/or clarifications to the PS&E that are deemed necessary. Our attached fee estimate shows the office staff hours allocated for the support during bidding; if additional effort is required beyond this, we will notify the City.
Subtask 4A Deliverables: Contract addenda and answers to bidders’ questions, if needed.
SUBTASK 4B: CONSTRUCTION SUPPORT SERVICES
NCE will provide support services to the City during construction of the project. At a minimum, these services are anticipated to include attendance at the pre‐construction conference meeting, on‐site visit in response to questions regarding design, reviewing Contractor submittals and responding to Contractor requests for information, providing recommendations for any necessary construction changes due to unforeseen field conditions, assisting with the review of Contract Change Orders, reviewing construction for acceptance (final walk through), and provide record drawings. This task does not provide any field inspection services and we understand that all construction inspection will be provided
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 11
by the City. Our attached fee estimate shows the staff hours allocated for office and field support during construction. If additional effort is required beyond these estimated staff hours, we will notify the City.
Subtask 4B Deliverables: Response to RFIs, contract change orders, modifications or revisions related to project original scope and character, and record drawings.
Task 5 – Additional Per Each Curb Ramp Survey and Design (Optional Task) NCE and NCE’s Project Surveyor will provide additional services on a per curb ramp basis for additions to the original scope of ramp design total. The original scope of work assumes up to 56 locations will need topographic surveying and curb ramp design. For the additional survey and design cost per each ramp, we have assumed the ramps to be within the project area and the number and location of ramps will be determined with the City Project Engineer prior to beginning the topographic surveying work. Subtraction of curb ramp design will be assumed to have the same refund cost to the City as shown in the attached fee estimate.
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | 12
2) Experience and History
NCE’s History and Capabilities
NCE is a client‐focused engineering, science,
planning, and construction services firm with
over 110 employees housed in five offices, including three in Northern California, one in Southern California, and our headquarters in Reno, Nevada. Services for this contract will be primarily provided from our local Richmond office. Since inception, NCE has focused on developing long lasting client relationships by providing high value services. Our clients repeatedly choose to work with NCE staff because of our collaborative style of working on projects, our commitment to making sure the project is a success, and the confidence they have in our ability to complete the project to their satisfaction. More than 85% of NCE’s revenues come from local, state, and federal agencies providing NCE with an in‐depth understanding of current regulations, policies, and procedures, as well as best practices.
Civil Design – NCE’s civil and pavement design engineers and technicians are experienced in developing plans, specifications, and engineer’s cost estimates (PS&E) for many City, County, and State Roadway Projects. The benefit of this experience to the City is that we thoroughly understand the cost and community impacts of our recommended pavement designs. NCE staff pride themselves in thinking about how construction will impact a neighborhood, a busy arterial, or pedestrian bicycle traffic and access. Our civil engineers are well versed in civil design elements that include drainage improvements, such as stormwater run‐off reduction, landscape and planter improvements, ADA curb ramps and sidewalks, curb and gutter, traffic striping and signs, and utility relocation.
Complete Streets – We understand the importance of incorporating and designing complete streets elements, such as bulbouts, landscaping, green infrastructure (e.g., bioretention), bus transit improvements, lighting, restriping, road diet, buffered and separated bike lanes, and dedicated bike lanes, into street improvement projects – making them safe for multi‐modal users, including transit riders, motorists, bicyclists, and pedestrians. We recently completed a quick‐build design of new bicycle and pedestrian facilities for the City of Richmond to connect the planned bike and pedestrian pathway across the Richmond‐San Rafael Bridge with key transit centers, including the Richmond BART Station and Richmond Ferry Terminal. When rehabilitating or designing complete streets, NCE meets with our clients to discuss options to improve safety and overall user experience, whether it is crossing the street, bicycling to work, or calming/slowing traffic.
NCE is the prime design consultant on the $15 million Rumrill Boulevard complete street multi‐modal corridor project for the City of San Pablo shown in the rendering to the right.
Utility Coordination – We understand the implications of utilities to street improvement and resurfacing projects, particularly those identified for reconstruction. Utilities can result in unplanned costs, delays, and street cuts in newly resurfaced streets. NCE has communicated with utilities, such as PG&E, Comcast, AT&T, Daly City Department of Water and Wastewater to ensure we understood what utility work was planned and identify potential conflicts. NCE also coordinates with utility owners throughout the project to obtain facility maps for cross‐checking and to appraise them of the proposed work (maximum excavation depth) and notify them of the City’s cut moratorium. During reconstruction, NCE, Richmond
City of San Pablo Rumrill
Boulevard Complete
Streets and Green
Infrastructure Project
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 13
utilities become even more important requiring accurate location of utility alignments to prevent damage and conflicts.
NCE has used private utility locators to establish utility depths using cost saving and non‐invasive techniques, such as Ground penetrating radar (GPR) in lieu of more invasive and expensive potholing. On several streets where shallow utilities exist, particularly laterals, NCE uses thinner pavement sections, such as full‐depth hot mix asphalt (HMA) to reduce conflicts with utilities.
ADA Compliance – These types of projects require a detailed and multi‐modal mindset. This requires attention and considerations to cross‐slopes and running slopes for ADA, drainage patterns when adding bulb‐outs to shorten crosswalk distances or provide traffic calming. For example, the picture to the right shows a common situation in streets with high slopes where the curb ramp design will require a design exception (chasing the flare to 15’ max and conforming to existing sidewalk grades). NCE will also coordinate curb ramp alterations with required alterations to the roadway striping plans such as crosswalks and vehicle or bicycle detector loops.
Green Infrastructure – NCE’s Engineers and Landscape Architects incorporate Green Infrastructure elements into their projects to provide communities with healthier public spaces, visually appealing streetscapes, enhanced pedestrian experience, storm water quality/management, reduced impervious pavements and minimize the impacts of climate change. Specific techniques include the adaptive reuse of tires as a component of rubberized cape seals and hot mix asphalt, reducing heat island impacts with the use of light aggregate and replacing impervious pavements with permeable pavers within parkways. With an innovative approach, NCE’s landscape architects worked with South San Francisco on its 2021 Green Infrastructure Program to study opportunities to integrate a range of green infrastructure elements such as stormwater planters, permeable paving and street trees into the City’s streetscape in coordination with proposed pavement rehabilitation. Several of these Green Infrastructure Elements will be constructed and will serve as a model for other communities to take a holistic approach to addressing issues of Stormwater Quality and Management, Climate Change Impacts, Pavement Management, Aesthetics and Placemaking.
Roadway Maintenance and Pavement Rehabilitation – Street rehabilitation extends well beyond the pavement and often requires important considerations, such as striping, curb and gutter repairs, pedestrian and bicycle improvements, signage, utility relocation, drainage improvements, and ADA compliant curb ramps and sidewalks. NCE has developed outstanding working relationships with our clients, implementing projects similar to the services described in the City’s scope of services. NCE provides a full spectrum of roadway pavement design services from conceptual engineering to plans, specifications, and engineer’s estimate of probably construction cost (PS&E) for preventive maintenance, rehabilitation, and reconstruction, NCE’s specialty.
We offer extensive experience and expertise with pavement treatment alternatives (cost saving, cutting‐edge, and green/ sustainable paving technologies, such as warm mix asphalt and in‐place recycling technologies). Our civil, pavement, and geotechnical engineers not only understand the types of pavements and treatment options, but they also understand the significance and cost implications of proper roadway support on competent subgrade soils to limit future settlement and cracking. Pavement design begins with an accurate assessment of the existing structural adequacy. Unlike traditional civil firms who rely only on core samples and R‐values, we employ our
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 14
pavement survey expertise in conjunction with deflection data and materials testing to assess the engineering properties of the existing roadway more accurately.
Deploying Pavement Technologies – Simply offering innovative pavement technologies does not always solve the problem; rather, ensuring that they are appropriate is what makes the difference in the success of a project. There are many factors to consider including cost, performance, future maintenance, traffic, access, pavement section properties, geometric constraints, and climate including shaded areas and drip lines, etc. The streets of Daly City have a wide variety of pavement conditions and user needs. There are numerous pavement rehabilitation techniques available today with new binders, new additives and polymers all of which may be applied in various layers to preserve pavement life. The figure to the right shows a range of seals and treatments that have worked successfully for NCE’s clients in California.
Pavement Design Related Geotechnical Engineering – NCE’s geotechnical engineers understand the significance of proper pavement support on competent subgrade soils to limit damaging settlement and future cracking. For example, based on field exploration
and soil/rock laboratory testing, we are able to accurately assess the engineering properties and the presence of subgrade soils that might be soft and exhibit pumping under vehicle loads. We develop appropriate subgrade stabilization techniques for problematic subgrade soils that may include moisture conditioning, lime treatment, geotextiles, and/or over‐excavation and replacement with aggregate materials.
Special Equipment – NCE can evaluate pavement
structural conditions with deflection testing using our Falling Weight Deflectometer (FWD). The FWD is a specialized tool that will support the development of a more cost‐effective design for the City. The in‐ situ conditions can be quickly evaluated to determine issues such as the extent of subgrade problems or the presence of voids/unstable soils. Pavement designs for phased or staged constructions are possible, as well as the ability to model and use new materials and technologies.
High Quality Deliverables – The NCE team holds quality of utmost importance – not just because of our clients’ requirements, but because it is vital to our continued professional and commercial viability. NCE’s Quality Assurance Management Program (QAMP) reduces production costs and ensures quality engineering designs, planning documents, and regulatory permit applications. Our focus is on producing engineering designs, technical reports, special studies, permit applications, environmental, and construction documents that maximize project delivery, while at the same time minimize regulatory agency comments and contractor claims and change orders. NCE’s QAMP is based on four principles: client satisfaction, employee participation, problem prevention, and continuous quality improvement.
The QAMP includes detailed review of each environmental and planning document, technical report, permit application, engineering specification, drawing, and calculation, and design document prior to submittal to the client, as well as providing meticulous record keeping and high standards of field documentation.
Our field technicians regularly work with our project managers and engineers during planning and design to perform constructability reviews, regulatory compliance analysis, and provide input on specifications based on their experience working with contractors. Clear and thorough reports, studies, plans, and specifications are one of the best claims‐avoidance tools you can have and a means of minimizing regulatory scrutiny.
NCE routinely provides biddability and constructability reviews for our clients to ensure projects can be constructed as
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 15
designed. The goal of NCE’s QAMP is to infuse quality throughout the entire project – that goal is shared by every NCE staff member. All of NCE’s projects include a QC Manager who reports directly to the Project Manager.
Relevant Project Experience
Over the past several years, NCE has developed outstanding working relationships with California clients, implementing projects similar to the City’s. Given that this project will require work within the street right‐of‐way with resurfacing and rehabilitation, NCE can offer our experience designing thousands of roads throughout California, including recently in Berkeley, Davis, Pacifica, Richmond, San Pablo, San Leandro, Berkeley, Belmont, Moraga, South San Francisco, Los Gatos, The Presidio, Sunnyvale, and Capitola. The City can be confident that NCE will provide technically innovative and cost‐ effective treatment selections, biddable and constructible design documents, and comprehensive construction support.
NCE has a proven record of success in delivering projects within the established contract budget and on‐time project submittal delivery. Table 1 below summarizes similar services and projects recently delivered to our clients.
Table 1 – NCE’s Cost Estimating Accuracy
Reference Projects
NCE has had the privilege to work with many cities and counties in Northern California, including Daly City, on roadway projects. The following pages provide examples of relevant projects that NCE has successfully delivered to our clients within the last three years. These projects exemplify our firm’s diverse experience and capabilities that we can provide Contracting Agency and Project Title Date
Engineer’s
Estimate
($M)
Construction
Cost ($M)
City of South San Francisco 2022 West Project * 2022 $10.5 $9.5 City of Pacifica 2022/23 Pavement Resurfacing Project * 2022 $1.2 1.2 City of Pacifica North Pacifica Pedestrian Improvement Project * 2021 $0.37 $0.31 City of Davis 2021 Transportation Infrastructure Rehabilitation Program 2021 $10.9 $10.4 City of Richmond Yellow Brick Road Complete Street 2021 $7.2 $6.8 City of San Pablo Rumrill Boulevard Complete Streets Project 2021 $14.6 $15.0 City of Belmont Street Reconstruction Project 2021 $2.1 $2.1 City of Richmond Castro Ranch Road Rehabilitation Project * 2021 $3.4 $3.1 Presidio Trust Pavement Rehabilitation and Maintenance Project 2021 $4.8 $4.8 City of South San Francisco 2019/20 Surface Seal Project * 2020 $2.5 $2.2 City of South San Francisco 2020 Pavement Rehabilitation Project * 2020 $2.2 $2.2 City of South San Francisco OBAG 2 Street Rehabilitation Project * 2020 $1.2 $1.3 City of Walnut Creek Parkside and Broadway Rehabilitation Project 2020 $1.9 $1.8 Town of Moraga 2020 Pavement Rehabilitation Project * 2020 $1.5 $1.4 City of Davis 2020 Transportation Infrastructure Réhabilitation Program 2020 $4.9 $4.3 City of Berkeley Measure M Street Rehabilitation 2019 2019 $5.4 $5.2 City of Sunnyvale Pavement Rehabilitation 2019 * 2019 $1.4 $1.1 City of San Leandro Annual Street Overlay/Rehabilitation 2018/19 2019 $10.1 $10.2 City of Berkeley Measure M Street Rehabilitation 2018 * 2019 $3.9 $3.2 City of Davis 2019 Transportation Infrastructure Réhabilitation Program 2019 $1.2 $0.9 City of South San Francisco Surface Seal Project 2018 * 2018 $1.2 $1.2 City of South San Francisco Surface Seal Project 2017 * 2017 $0.92 $0.75 * Denotes projects where NCE's proposed Project Manager, Victor Lemus, has prepared Engineer's Estimate which was within 10% or less of the construction cost proposed by the lowest responsive, responsible bidder.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 16
to the City. Additionally, the references provided will allow the City to verify NCE’s experience and level of satisfaction of our clients. NCE proposed key staff are also noted in each project description.
Project and Client Information Project Overview
2017 to 2022 Street Surface Seal
and Rehabilitation Projects
2022 West Highway 101
Pavement Rehabilitation Project
Agency: City of South San
Francisco
Contact: Angel Torres, PE
Phone: (650) 829‐6660
Email: [email protected]
Timeline: 2018‐Ongoing
Construction Cost: $30M (Street
Surface Seal & Rehab Projects);
$20M (West Highway 101)
NCE has successfully completed pavement resurfacing, rehabilitation, and reconstruction projects for the City since 2017, that comprised of 47.7 centerline miles of streets for resurfacing and 16.0 centerline miles of streets for rehabilitation. Every two years, the City surveys the streets and enters the data into the StreetSaver® database. This database assists staff in determining the pavement condition index (PCI) for each street segment and the street network overall. NCE assists City to update historical maintenance and rehabilitation records and conduct field review to identify candidate streets for City’s annual surface seal and rehabilitation programs. Based on City’s paving budgets and maintenance strategy, NCE has also utilized StreetSaver® database and field reviews to develop multi‐year work plan for the City in 2018, 2020, and 2022.
NCE was recently selected for the City’s 2022 West Highway 101 Pavement Rehabilitation Project to perform project management, pavement rehabilitation design, PS&E, and bidding and construction support services. Additionally, the ambitious paving plan will treat all rehabilitation candidates in the City west of Highway 101.
NCE Key Staff: Ryan Shafer (Project Manager/Principal Engineer), Mei‐Hui Lee (Project Manager/Senior Engineer), Victor Lemus (Co‐Project Manager/Civil Design Lead), Franz Haidinger (QA/QC Manager/Principal Engineer), James Signore (Lead Pavement Engineer), Tom Van Dam (Lead Pavement Engineer), Sharlan Montgomery Dunn (Pavement Engineer), Paola Murillo (Staff Engineer) and Alex Paez (CAD Designer). Subconsultants: Mountain Pacific Surveys (Topographical Survey) and Psomas (Subsurface Utility Detection).
Project and Client Information Project Overview
FY 2020/21 and FY 2021/22
Pavement Resurfacing Program
and 5‐Year Work Plan
Agency: City of Pacifica
Contact: Lisa Petersen, PE
Phone: (650) 738‐3770
Email: [email protected]
As part of its 5‐year work plan developed by NCE, the City allowed for pavement rehabilitation and resurfacing to be designed in advance of construction and allow for earlier bidding to obtain competitive bids. It was the City’s desire to have resurfacing projects for each year, grouping and aggregating by neighborhoods for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget. More cost‐effective cape seal or multi‐layer slurry seal with base repair and leveling course was applied on residential streets under poor to failed pavement condition to help City treat more streets within limited budgets. This was made possible by NCE staff making several field visits to verify existing street conditions and tailoring cost‐effective treatments to each street.
NCE had a tight deadline to submit both packages but our collaboration with the staff across all offices allowed to mobilize resources to this project and get bid documents ready for winter bidding.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 17
Timeline: 2018‐Ongoing
Construction Cost: $2.5M
NCE Key Staff: Ryan Shafer (Principal), Mei‐Hui Lee (Project Manager), Victor Lemus (Co‐Project Manager/Civil Design Lead), James Signore (Lead Pavement Engineer), Sharlan Montgomery Dunn (Pavement Engineer), and Alex Paez (CAD Designer).
Project and Client Information Project Overview
Pavement Rehabilitation /
Maintenance, and Bikeway
Improvements
Agency: Presidio Trust of San
Francisco
Contact: Amy Marshall
Phone: (415) 317‐8459
Email:
[email protected]
Timeline: 2019‐Ongoing
Construction Cost: $4.8M
NCE designed the Presidio Trust’s pavement rehabilitation and maintenance project throughout the Presidio Trust campus including a substantial portion of the bicycle lane network. The scope for this project included preparing plans, specifications, and cost estimates for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and design of minor concrete including bus platforms and curb and gutter. As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, contamination, cultural resources, and buried obstructions such as rail lines and recommended an appropriate pavement treatment. NCE also reviewed the Trust’s minor concrete specifications and details and discussed preliminarily how improvements could be made to reinforcement, slab thickness, joint spacing, and mix design.
NCE Key Staff: Ryan Shafer (Principal/Project Manager), Victor Lemus (Project Engineer), James Signore (Pavement Engineer), and Sharlan Montgomery Dunn (Project Engineer), Paola Murillo and Sara Dowling (Staff Engineers).
Subconsultants: Mountain Pacific Surveys (Topographical Survey).
Project and Client Information Project Overview
2018‐2021 Annual
Overlay/Rehabilitation, Pavement
Design, and PS&E
Agency: City of San Leandro
Contact: Nick Thom, PE
Phone: (510) 577‐3431
NCE was contracted by the City of San Leandro to prepare construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and RHMA overlays, full‐depth asphalt reconstruction, full‐depth reclamation (FDR), and a pilot project for cold central plant recycling on an arterial street based on recommendations provided by NCE. Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and Class IV bike lanes. The design of traffic calming bulbouts were prepared for two streets where NCE analyzed vehicle turning capabilities and impacts to surface drainage. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s Engineer’s Cost Estimate matched that of the winning
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 18
Email: [email protected]
Timeline: 2020 and ongoing for
current design work
Construction Cost: $17M
contractor bid, indicating that NCE was able to anticipate the value of the scope of work.
NCE Key Staff: Ryan Shafer (Principal/Project Manager), Mei‐Hui Lee (Senior Engineer), Franz Haidinger (QA/QC Manager), Paola Murillo (Project Engineer/Technical Lead), James Signore (Associate/Pavement Engineer), Tom Van Dam (Lead Pavement Engineer), and Alex Paez (CAD Designer).
Subconsultants: Mountain Pacific Surveys (Topographical Survey) and Psomas (Subsurface Utility Detection).
Project and Client Information Project Overview
Castro Ranch Road Rehabilitation
and Complete Streets
Improvements
Agency: City of Richmond
Contact: Yader Bermudez
Phone: (510) 774‐6300
Email:
[email protected].
ca.us
Timeline: 2018‐2021
Construction Cost: $3.1M
NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow and calming, new pedestrian crossing with rectangular rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway
deficiencies including subgrade
damage at a retaining wall and
repair of guard rail systems. NCE
developed a cost saving pavement
treatment alternative using CIR
with both foam and emulsion
technologies resulting in over
$500,000 in cost savings over conventional mill and overlay pavement treatments.
NCE Key Staff: Ryan Shafer (Principal/Project Manager), Franz Haidinger (QA/QC Manager/Principal Engineer), Victor Lemus (Civil Design Lead), and James Signore (Associate/Pavement Engineer).
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | 19
3) Organization Chart
NCE Project Manager
NCE brings a collaborative and innovative problem‐solving mentality to address the technical challenges facing the City’s infrastructure‐related, day‐to‐day issues. Our key personnel have worked together on dozens of projects, including the projects discussed in the Reference Projects section of this document. The single most important tool for successful project management is clear, consistent, and cooperative communication. Our proposed Project Manager, Victor Lemus, PE, will be the single point of contact for the City and will communicate regularly with the City regarding progress of the project (PS&E), any issues that may affect plan production, or update on field work schedules. Victor has civil and pavement design and project management experience, including engineering projects related to complete streets, street maintenance and rehabilitation, infrastructure asset management, bike and pedestrian facility upgrades, parking lots, extensive ADA curb ramp design, drainage, and utilities. He is knowledgeable of the technical resources in the firm, familiar with transportation engineering, understands public sector clients, and has authority to champion resources within the firm. The years of experience working on similar projects has made Victor understand the bidding market and prepare the Engineer’s Estimate of Construction within 10% or less of the actual construction cost. He will work closely with the team and the City to bring the project to successful completion. Victor will be supported by J. Ryan Shafer, PE, GE, Principal of NCE’s Richmond office and Franz Haidinger, PE, as NCE’s Chief Engineer and Quality Assurance and Quality Control (QA/QC) Manager.
NCE Team Structure
The NCE team presented in Table 2, has the demonstrated experience designing transportation projects, specifically infrastructure pavement rehabilitation and maintenance and complete‐street projects. The NCE team is capable of seamlessly conducting the City’s scope of work for this contract and are ready to begin work upon notice to proceed from the City. NCE is committed to providing the staff identified within this section. Our key staff will be available throughout this contract. In addition, all team members, including subconsultants, will be managed as an extension of NCE.
Table 2. Proposed Project Manager
and Key Personnel
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 20
Subconsultants
We have very carefully and intentionally identified our teaming partners to offer a combination of trusted high‐quality work deliverables and experience. NCE will serve as the prime consultant, and we have assembled an exceptionally qualified, proven team of specialized firms and individuals with whom we have worked successfully for many years:
Mountain Pacific Surveys (MPS) will provide topographical surveying services. MPS is a trusted partner of NCE and will complete topographic surveys on all street sections. MPS is a professional survey services firm providing boundary surveying and mapping, design surveys, right‐of‐way engineering, construction surveys, environmental surveys, monitor surveys, and photogrammetric engineering services to the public and private sector. In addition, MPS has experience working on various city street rehabilitation projects and has been involved with numerous projects for street resurfacing as our surveyor.
Contact Information for MPS
Charles Weakley, LS, Principal, MPS, 1735 Enterprise Drive, Suite 109, Fairfield, CA 94533 Phone: (707) 425‐6234; Email: [email protected]
Psomas will provide subsurface utility detection services on all street sections given the potential for streets to require reconstruction or improvements in potential conflict with utilities. Psomas is a firm with noted expertise in subsurface utility engineering and locating to complete locate utilities with non‐invasive geophysical techniques such as ground penetrating radar (GPR). Psomas will also provide utility potholing in the event there are key location where critical utility facilities require greater accuracy or verification. Psomas is currently providing subsurface utility detection services throughout California for a variety of public agency clients. With 70 years of experience, Psomas is a trusted teaming partner having worked on numerous street rehabilitation and maintenance projects with NCE.
Contact Information for Psomas
Tom Pilarski, PLS, Director, Subsurface Utility Engineering, Psomas, 5 Hutton Centre Drive, Suite 300, Santa Ana, CA 92707 Phone: (714) 481‐7908; Email: [email protected]
BSK Associates (BSK) will provide geotechnical laboratory testing services on subgrade soil materials. BSK is a 100 percent employee‐owned California S corporation that provides consulting engineering, construction observation, materials testing, special inspection, and analytical laboratory services. BSK’s team of geotechnical engineers, geologists, and support staff has the technical capability to provide creative, practical, and technologically sound recommendations within a reasonable budget. BSK is well‐equipped to provide cost‐effective investigations and recommendations for many types of engineering improvement projects, ranging from independent review of geotechnical and soils reports, geotechnical engineering investigations, repair of landslide and erosion failures, to levee improvements.
Contact Information for BSK
Tim Rodriguez, North Valley Regional Manager, BSK, 399 Lindbergh Avenue, Livermore, CA 94551 Phone: (925) 315‐3151; Email: [email protected] Staff Resumes
On the following pages we respectively provide focused resumes for each NCE key staff member in the Organization Chart to further demonstrate their qualifications and relevant projects they have supported in a similar role.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 21
Ryan Shafer, PE, GE
Principal‐in‐Charge
Ryan Shafer, PE, GE, is an experienced Principal and Project Manager that is highly skilled in managing interdisciplinary teams of engineers, scientists, and planners for complex projects requiring civil engineering, geotechnical engineering, pavement engineering, structural engineering, transportation and traffic engineering, hydrology and hydraulics, coastal engineering, regulatory permits, technical studies and resource assessments, and environmental documents. In addition, he has managed and provided civil and geotechnical engineering on a wide range of public and private projects, including vertical development, municipal roads, trails, drainage infrastructure, landfills, public transit, recreation areas and parks, industrial facilities including refineries, and waterfront structures giving him an understanding of how to work with diverse project types. His clients provide feedback that NCE is an effective partner and steward, understanding what is important to each community. Additionally, having worked for many municipal clients throughout California, Ryan adds value by helping cities and counties manage and maintain their streets, roads, bicycle and pedestrian facilities, and recreation parks and trails. He applies his expertise in geotechnical and pavement engineering to infrastructure projects and paving programs from the early stages of condition surveys to providing support during construction.
Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Project Manager/Principal Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million.
Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Principal‐in‐Charge. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. Project Manager. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and
Education
MS, Geotechnical Engineering,
University of California,
Berkeley, 1998
BS, Geological Engineering,
Colorado School of Mines, 1996
Registrations/Certifications
Professional Engineer – Civil,
CA #62349
Professional Engineer –
Geotechnical, CA #2713
Affiliations
American Society of Civil
Engineers
American Public Works
Association
Joined NCE
2005
Years of Experience
22 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 22
preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.
Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.
Pavement Rehabilitation/Maintenance and Bikeway Improvements, Presidio Trust of San Francisco, CA. Project Manager. NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform.
As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐ place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.
OBAG 2 Street Rehabilitation, City of South San Francisco, CA. Project Manager. NCE provided pavement and civil engineering design, including Caltrans E‐76 authorization for construction, utility coordination, pavement and curb/gutter condition survey, pavement deflection testing, pavement coring, pavement design recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.
Castro Ranch Road Rehabilitation and Complete Streets Improvements, City of Richmond, CA. Principal/Project Manager. NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow and calming, new pedestrian crossing with rectangular rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and emulsion technologies resulting in over $500,000 in cost savings over conventional mill and overlay pavement treatments.
Measure M Street Rehabilitation Program, City of Berkeley, CA. Project Manager. NCE implemented the City’s $30 million, multi‐year street surface seal, rehabilitation and reconstruction project, one of the City’s largest projects to date.
As project manager, Ryan managed the development of pavement design and plans, specifications and estimate for more than 30 miles (150 street sections) of surface seal, street rehabilitation, and reconstruction. Complete street elements included new bike lanes, intersection reconfigurations, new pedestrian crosswalks, storm drain improvements, and design of nearly 600 curb ramps, including pedestrian safety improvement bulbouts. NCE’s pavement design solutions offered cost savings and environmental benefits using rubberized paving products diverting tires away from landfills, use of longer lasting pavement materials, and using recycle in‐place technologies.
Yellow Brick Road Complete Streets, City of Richmond, CA. Principal. The project involves the design and implementation of complete streets improvements along roadways in the Yellow Brick Road network. Improvements include curb extensions/ bulbouts, sidewalks, ADA curb ramps, median refuges, trail crossings, Class II bicycle facilities, wayfinding signs, pedestrian lighting, landscaping, roundabouts, speed tables, raised intersections, rapid flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 23
Victor Lemus, PE
Project Manager
Victor Lemus, PE, is well‐experienced serving as Project Manager as well as Civil Design Lead on large, multi‐discipline street rehabilitation and resurfacing projects, particularly on projects requiring complete street elements and complicated ADA improvements at NCE. He is notably recognized for his ADA design expertise with curb ramp and bulb‐outs as part of significant roadway rehabilitation projects on streets throughout Northern California that often include difficult grades, utility issues, tight ROW constraints, and in some cases require consideration of design exceptions. Victor is also proficient at street layout plan and profile design, striping plans, and civil design details for street improvement projects. He has extensive field data experience and has led teams of engineers on field data collection on roadway for curb and gutters, sidewalk, digouts or base repairs, ADA curb ramps, crosswalks, striping, and drainage improvements.
Representative Projects
2016 Street Resurfacing Project, City of Daly City, CA. Staff Engineer. NCE completed pavement and civil design services for the 2016 Street Resurfacing Project. The construction cost for this project was approximately $2 million. Victor completed the PS&E that consisted of setting up project kick‐off meetings, coordinating with utilities, pavement coring, field data collection, preparing civil and striping plans, cost estimation of the construction cost, as well as writing Technical Specifications for the bid items.
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Co‐Project Manager/Civil Design Lead. NCE has been providing to the City a various of pavement management services including development of a multi‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. In 2017 to 2022 pavement management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 64 centerline miles (more than 200 sections) of City streets with a construction cost over $30 million. In addition, NCE has modified City’s Street Saver database and updated historical maintenance and rehabilitation records to perform budget analyses and develop multi‐year work plan. Recently, City’s 6‐Year Work Plan was updated based on City’s budget, rehabilitation strategy and candidate streets are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget. NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays and surface reconstruction. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Co‐Project Manager/Civil Design Lead. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles.
Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
FY 2020/21 and FY 2021/22 Pavement Resurfacing Program and 5‐Year Work Plan, City of Pacifica, CA. Co‐Project Manager/Civil Design Lead. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects
Education
BS, Civil and Environmental
Engineering, University of
California, Davis, 2014
Registrations/Certifications
Professional Engineer – Civil,
CA #89769
Affiliations
Chi Epsilon
Joined NCE
2014
Years of Experience
7 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 24
based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
OBAG 2 Street Rehabilitation, City of South San Francisco, CA. Project Engineer. The City retained NCE to provide pavement and civil engineering design, including Caltrans E‐76 authorization for construction, utility coordination, pavement and curb/gutter condition survey, pavement deflection testing, pavement coring, pavement design recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.
Castro Ranch Road Rehabilitation and Complete Streets Improvements, City of Richmond, CA. Civil Design Lead. NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow and calming, new pedestrian crossing with rectangular rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and emulsion technologies resulting in over $500,000 in cost savings over conventional mill and overlay pavement treatments. 2017 Berkeley Rehabilitation/ PCC Work and Surface Seal, Berkeley, CA. Staff Engineer. Measure “M” was a $30 million bond passed to accelerate street improvements in Berkeley. NCE was tasked to consider cost effective treatments that extended paving dollars and offered recycling or environmental benefits. Victor’s involvement included field data collection, marking concrete and base repairs in the field and mapping them onto a GPS unit for import into CAD. Victor was also involved in the civil design aspect of the project, most notably regrading reconstruction streets to ensure drainage and eliminate high street cross slopes.
2020/21 Pavement Rehabilitation, Town of Moraga, CA. Project Manager/Project Engineer. Victor was the Project Manager and Technical Lead for curb ramp design, street layout plan and profile design, striping plans, and civil design details on plans for various streets. The project includes curb ramp installation and replacement, storm drain replacement, sidewalk and curb and gutter repairs, CCTV, striping, and utility location and coordination. 2019 SB1 Pavement Rehabilitation, City of Sunnyvale, CA. Project Engineer. The City of Sunnyvale sought assistance from a licensed Engineering firm to provide professional services for design and preparation of bid documents and construction support for the Pavement Rehabilitation 2019 SB1 project. The scope of work included preparation of preliminary design, design development, bid documents, and bidding/construction support for Public Works competitive bidding. Ancillary work included construction cost estimating, schedule monitoring, preparation of reports and recommendations, and project management. Victor was responsible for field data collection, coordination with utilities and VTA, pavement design review, PS&E production, bidding and construction support. 2015 Street Surface Seal, City of Berkeley, CA. Staff Engineer. Victor performed a street seal and striping inventory, field survey of curb ramps, assisted with striping plans and prepared design plans, including vicinity maps and details of curb ramps to adjust to latest ADA requirements, for a surface seal program on 27 streets in the City of Berkeley. The surface seal program included slurry seals and rubberized cape seals with an estimated construction value of $2 million.
Yellow Brick Road Complete Streets, City of Richmond, CA. Project Engineer and E76 Coordinator. Improvements include curb extensions/bulbouts, sidewalks, ADA curb ramps, median refuges, trail crossings, Class II bicycle facilities, wayfinding signs, pedestrian lighting, landscaping, roundabouts, speed tables, raised intersections, rapid flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 25
Franz Haidinger, PE
Quality Assurance and Quality Control (QA/QC) Manager
Franz Haidinger, PE, is a Principal and Chief Engineer at NCE responsible for overseeing, managing, and developing designs and PS&Es for roadway improvement projects and implements sustainable technologies. In his role at NCE, he enjoys the opportunity to improve and protect the built environment, whether it’s implementing sustainable pavement technologies, creating storm water pollution prevention plans, assessing drinking water sources, or remediating contaminated soil. His clients value his ability to understand their needs, evaluate alternatives and determine the most appropriate solutions. According to Sean Rose, Public Works Director of the Town of Woodside, “Franz is a detail‐oriented engineer that does a very thorough job preparing plans and specifications. He did a great job listening to our needs and specific comments and provided thorough and concise responses.
Ultimately, he provided a high‐quality design, and he was a pleasure to work with.” Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. QA/QC Manager/Principal Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐ year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million.
Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services.
OBAG 2 Street Rehabilitation , City of South San Francisco, CA. QA/QC Manager. The City retained NCE to provide pavement and civil engineering design, including Caltrans E‐76 authorization for construction, utility coordination, pavement and curb/gutter condition survey, pavement deflection testing, pavement coring, pavement design recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.
2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. QA/QC Manager. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
Education
Diplom‐Ingenieur (Equivalent of
MS degree), Civil Engineering,
University of Natural Resources
and Life Sciences, Vienna,
Austria, 1997
Registrations/Certifications
Professional Engineer – Civil,
CA, #64725
Affiliations
American Society of Civil
Engineers
American Public Works
Association
Joined NCE
2004
Years of Experience
22 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 26
Civil Design and Measure K Paving Program, Town of Moraga, CA. Project Manager and Lead Civil Engineer. Responsible for the preparation of construction documents to reconstruct three streets (totaling approximately 200,000 square feet) in the Town of Moraga. FDR was chosen as the reconstruction alternative based on a comprehensive pavement and subgrade investigation. The design plans included grading plans and profiles and included drainage improvements and the design and construction of a retaining wall (soldier piles and lagging) to protect an eroding storm drain culvert outfall.
The project included comprehensive regulatory compliance and permitting services, as well as coordination with adjacent property owners (St. Mary’s College) as some of the design elements were sited in biological sensitive areas. Key to the project success was the tight collaboration with staff responsible for the permitting and regulatory compliance tasks, incorporation of permitting requirements and mitigation measures into the design documents, and communication with Town staff and stakeholders. After passing a 1 percent sales tax in 2012 to raise approximately $8 million for streets and roads, Measure K, the Town selected NCE for a three‐year, on‐call contract to provide a variety of pavement‐related services for this significant community project.
Measure M Street Rehabilitation Program, City of Berkeley, CA. Technical Lead/QC Manager. NCE developed the PS&Es and pavement designs. Phases 1 and 2 consisted of 54 rehabilitation and reconstruction street sections and 48 surface seal street sections, traffic control plans, replacing/retrofitting nearly 450 curb ramps, replacement of curb/gutter, storm drains, bike/pedestrian improvements, and intersection reconstruction. Design was completed on a very tight timeframe.
Transportation Infrastructure and Rehabilitation Program (TIRP), City of Davis, CA. Project Manager. Responsible for the preparation of construction documents for the rehabilitation and reconstruction of several residential streets and arterials in the City of Davis. The project includes the reconstruction of a mile of bike paths currently paved with asphalt concrete to PCC pavement. This project is a continuation of a three‐year contract with the City of Davis to improve its streets and bike path network. The work includes topographic surveying, pavement condition analysis, pavement coring and deflection testing, quantity take offs for utility covers, striping, ADA related upgrades, and curb/gutter, and sidewalk repairs. The project was divided into three bid packages, i.e., slurry seal package, road rehabilitation/reconstruction, and bike path reconstruction to attract more contractors and minimize contractor mark‐ups on subcontractors.
Castro Ranch Road Rehabilitation and Complete Streets Improvements, City of Richmond, CA. QA/QC Manager/ Principal Engineer. NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow and calming, new pedestrian crossing with rectangular rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and emulsion technologies resulting in over $500,000 in cost savings over conventional mill and overlay pavement treatments.
Rumrill Boulevard Complete Streets and Green Infrastructure, City of San Pablo, CA. QA/QC Manager. NCE is designing an approximately $15 million in construction value, 2.5‐mile‐long complete streets project along Rumrill Boulevard. This is a Community‐based design process focused on transforming the street into a safe and friendly place for people and business by improving conditions for walking, bicycling, and transit. This street corridor will receive a road diet and to add Class IV bikeways in both directions of travel. Additional key project elements include landscape buffers, widened bus stop landings, increasing parking, and video detection at traffic signals for vehicles and bicycles. In addition, the project will include LID design and bioretention basins, landscaping improvements, curb extensions/bulbouts, sidewalk widening, crosswalk improvements with rectangular rapid flashing beacons, median refuges bus stop shelters, expanded street lighting, ADA concrete and roadway improvements (curb ramps, sidewalks, driveways, medians, and regrading pedestrian roadway crossings), storm drainage improvements, trail crossings, wayfinding signs, pedestrian and street lighting.
Yellow Brick Road Complete Streets, City of Richmond, CA. Lead Civil Engineer. Improvements include curb extensions/bulbouts, sidewalks, ADA curb ramps, median refuges, trail crossings, Class II bicycle facilities, wayfinding signs, pedestrian lighting, landscaping, roundabouts, speed tables, raised intersections, rapid flashing beacons, back‐in angled parking, and green painted bicycle lanes to create safe walkways and bikeways.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 27
Mei‐Hui Lee, PhD, PE
Project Management Program Specialist
Dr. Mei‐Hui Lee has a PhD in civil and pavement engineering and over twelve years of extensive experience in pavement design, evaluation and maintenance projects.
Currently, Mei‐Hui serves as Project Manager and Senior Engineer for various pavement and civil design and pavement management projects at NCE. Her clients include the Counties of Siskiyou, Mendocino, Lake, Trinity, Mariposa and Sacramento as well as multiple cities including South San Francisco, Pacifica, Belmont Sacramento, Davis, Stockton, Elk Grove, Lincoln, and Folsom. Mei‐Hui is certified by the MTC inspector certification testing program. She was also involved in trench cut study for City of Sacramento and Pacifica.
Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Project Manager/Senior Engineer. NCE has been providing to the City a various of pavement management services including development of a multi‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. In 2017 to 2021 pavement management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 48 centerline miles (more than 200 sections) of City streets with a construction cost over $14 million.
In addition, NCE has modified City’s Street Saver database and updated historical maintenance and rehabilitation records to perform budget analyses and develop multi‐year work plan. Recently, City’s 6‐Year Work Plan was updated based on City’s budget, rehabilitation strategy and candidate streets are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget. NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Project Manager. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Project Manager. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As
Education
PhD, Civil Engineering, National
Taiwan University, Taiwan,
2009
MS, Civil Engineering, Columbia
University, New York, 2012
BS, Civil Engineering, National
Taiwan University, Taiwan,
2002
Registrations/Certifications
Professional Engineer – Civil,
CA #87635
MTC StreetSaver® Rater
Certification Program
Affiliations
American Society of Civil
Engineers
American Concrete Pavement
Association
Joined NCE
2014
Years of Experience
12 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 28
part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. Senior Engineer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.
Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate. 2015 to 2020 Transportation Infrastructure Rehabilitation Capital Improvement Project, City of Davis, CA. Project Engineer/Senior Engineer. This project involved producing pavement rehabilitations for 698 street sections in Davis from 2015 to 2020 with a construction cost over $18.5 million. The project involved non‐destructive pavement deflection testing, pavement coring, pavement condition surveys and base repair location identification. Following the collection of the field data, rehabilitative recommendations were made based on each street segment’s structural integrity and performance. Recommendations for each section were summarized in a pavement design report and submitted to the City. In addition, NCE has updated City’s pavement management program in 2015 and 2018. 3‐Year work plan for City’s capital improvement project was developed in 2017 with annual paving budget $3.5 million per year. 2015 Street Reconstruction Project, Town of Moraga, CA. Project Engineer. In order to effectively spend funds to be collected from a recent sales tax measure passed by Town residents, NCE worked with Town of Moraga to plan and prepare for the aggressive and cost‐effective treatments for the three phase projects. In phase III, a total 13 streets of residential and collector streets are designated for reconstruction or overlay. Mei‐Hui served as Project Engineer in preparation of the field data collection, including identifying localized pavement repairs and curb and gutter repairs and pavement design analysis. Pavement reconstruction recommendations were summarized in the report and submitted to the Town.
2015 Street Resurfacing Program, City of San Bruno, CA. Project Engineer. This project included 16 sections in the City’s pavement rehabilitation design and seal program. Mei‐Hui served as Project Engineer in preparation of the field data collection, including identifying localized pavement coring plan, FWD testing, pavement condition survey and pavement design analysis. She also conducted budgetary analysis on City’s StreetSaver® database by different maintenance strategies and funding level. Summary of analysis result were submitted to the City.
Main Street Rehabilitation, City of Oakley, CA. Project Engineer. This project included rehabilitation recommendations for a one‐mile stretch of Main Street in Oakley. The project involved non‐destructive pavement deflection testing, pavement coring, pavement condition surveys and base repair location identification, all reviewed by Mei‐Hui. The subject section of Main Street last received an overlay about 20 years ago and the only maintenance that had been completed since was the repair of the worst base failure areas in 2009 by Caltrans prior to being relinquished to City. The street asphalt surface is visibly aged and in need of pavement rehabilitation to address low to medium severity longitudinal and transverse cracking, as well as block cracking and potentially accommodate increased traffic from future development. Recommended treatment is thin mill and overlay with rubber hot mix asphalt to control reflecting cracking.
Pavement Management System Updates, Various Cities and Counties. Project Engineer. Mei‐Hui has been involved with updating Pavement Management Systems (PMS) for many Cities and Counties throughout California. She is responsible for the analysis and quality control of pavement distress data collection, updating maintenance and rehabilitation decision trees and the treatment unit costs, and the development of budget scenarios and summary reports. She has developed cost‐effective maintenance treatments and strategies, prepared custom multiple‐year detailed street maintenance plans and budget option reports, and linked GIS maps with management sections in the PMS database.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 29
James Signore, PhD, PE
Lead Pavement Engineer (Asphalt)
Dr. James Signore, PE, serves as a Principal Pavement Engineer at NCE. He specializes in pavement design and evaluation, rehabilitation and maintenance, materials assessment, and training. He has experience in designing pavements for many local agencies, Caltrans and for heavy vehicle loading applications at airfields and ports.
He has spent years researching all types of pavement materials, having directed a state‐of‐the‐art AMRL certified and Superpave mix design equipped research laboratory and is well versed in state and local pavement practices and specifications. James has taught NHI’s and ASCE’s “Techniques for Pavement Rehabilitation” (including best practices for utility cuts and patches) seminars to practicing engineers for 20 years. He taught graduate courses in pavement engineering at San Jose State University and many of his former students are civil engineers at local agencies. He uses his practical and research experience, technical knowledge and teaching skills to develop an understanding of client needs and the creation of design and rehabilitation strategies that offer the client agency the leading‐edge in methods and materials for their pavements.
Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Lead Pavement Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million.
Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services.
2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Lead Pavement Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
OBAG 2 Street Rehabilitation, City of South San Francisco, CA. Pavement Engineer. The City retained NCE to provide pavement and civil engineering design, including Caltrans E‐76 authorization for construction, utility coordination, pavement and curb/gutter condition survey, pavement deflection testing, pavement coring, pavement design
Education
PhD, Civil Engineering,
University of Illinois, Urbana‐
Champaign, 1998
MS, Civil Engineering,
University of Illinois – Urbana‐
Champaign, 1994
BS, Electrical Engineering,
Clarkson University, 1985
Registrations/Certifications
Professional Engineer – Civil,
CA, #62647
Affiliations
TRB Committee AFD70,
Pavement Rehabilitation
TRB Committee AFD70‐1,
Pavement Interlayer Systems
ASCE Airfield Pavement
Committee
FAA Pavement Technical
Working Group
American Society of Civil
Engineers
Joined NCE
1999‐2001, 2014
Years of Experience
25 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 30
recommendations, PS&Es, bidding and construction support services, and Caltrans encroachment permit. It is an OBAG 2 funded program to preserve local streets and roads within the City’s priority development area. Selected streets were based on the City’s criteria of the construction budget limited to the grant amount, location within the City’s priority development area, and candidates for rehabilitation.
Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA.
Associate/Pavement Engineer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE. Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.
Castro Ranch Road Rehabilitation and Complete Streets Improvements, City of Richmond, CA. Associate/Pavement Engineer. NCE completed civil engineering, pavement engineering, hydrology and hydraulic engineering, and special environmental studies for the Castro Ranch Road Rehabilitation Project. This project involved a significant redesign and rehabilitation of rural roadway corridor to provide new buffered bike lanes to address a missing bicycle lane link along the Three Bears Loop, improved traffic flow and calming, new pedestrian crossing with rectangular rapid flashing beacons, median landscaping, construction of new sidewalk, replacement of curb ramps, assessment of drainage structures and improvements, and addressing other roadway deficiencies including subgrade damage at a retaining wall and repair of guard rail systems. NCE developed a cost saving pavement treatment alternative using CIR with both foam and emulsion technologies resulting in over $500,000 in cost savings over conventional mill and overlay pavement treatments.
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Lead Pavement Engineer. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
Measure M Street Rehabilitation Program, City of Berkeley, CA. Lead Pavement Engineer. James is responsible for the development of pavement design and PS&E for the first phase of the project, which consists of 39 rehabilitation and reconstruction street sections and 24 surface seal street sections, replacing/retrofitting nearly 300 curb ramps, replacement of curb/gutter, intersection reconstruction, bike and pedestrian improvements, and traffic control plans.
Pavement Guidance, Numerous Bay Area Cities, CA. Lead Pavement Engineer. James provides technical support and guidance on various pavement related issues from design to materials to specifications for many clients in the Bay Area.
On‐Call Pavement Engineering, California Department of Transportation, Statewide, CA. Project Manager. James manages the pavement on‐call contract with Caltrans and is responsible for all contractual and project management activities. Major task orders emphasize asphalt and concrete pavement performance and evaluation for all types of pavement issues such as a comparison of ARHM and conventional HMA performance, HMA smoothness specifications, and polyester inlay materials evaluation. He provided technical guidance on the selection and testing of joint filler and spall repair materials and acted as a construction methods assessor on the installation of precast concrete slabs. He wrote, reviewed, or edited numerous interim and final reports including those dealing with continuously reinforced concrete, rapid set concrete, concrete inlay hardeners, and concrete flexural strength.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 31
Thomas (Tom) Van Dam, PhD, PE, FACI, LEED AP –
Lead Pavement Engineer (Concrete)
In the rapidly evolving field of civil engineering, sustainability is increasingly important. Dr. Tom Van Dam is leading the way by working with the Federal Highway Administration to guide more sustainable pavement practices and applying his expertise on a variety of projects. One of NCE’s five pavement professionals with a PhD, Tom is proud of the level of expertise that exists within the firm. He enjoys working with clients and the public and can effectively communicate the importance and applicability of highly technical information. He feels that NCE’s clients “know they can rely on us to bring them the latest technological knowledge as it relates to pavements and pavement materials.” Tom brings a range of expertise to his projects. He has authored more than 75 publications and has given more than 100 presentations on pavements, concrete materials and sustainability. An active researcher, he has led projects for agencies, foundations, departments of transportations and private entities. He has also been a professor, Director of the USDOT‐funded University Transportation Center for Materials in Sustainable Transportation Infrastructure and Director of the Michigan DOT Transportation Materials Research Center.
Representative Projects
2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Lead Pavement Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
Pavement Engineering On‐Call Services, San Francisco International Airport, City and County of San Francisco, CA. Forensic Evaluator. As the Airport’s On‐Call Pavement Consultant, NCE has multiple responsibilities, including maintaining the MicroPAVER® APMS including automated distress surveys, determining the ACN/PCN for all runways and taxiways, conducting numerous forensic analyses to investigate development of distress on airside pavements, developing construction guidelines for long‐lasting longitudinal joints for asphalt pavements and conducting pavement designs for runway rehabilitation and taxiway construction. Tom has provided technical support throughout this project, guiding the forensic evaluations and reviewing pavement design reports.
On‐Call Pavement Engineering, Statewide, Caltrans, CA. Subject Matter Expert. This is a multi‐year on‐call contract to provide technical solutions and assist with implementing new strategies and policies that will improve the State’s highway network. Key elements include sustainability, forensics, design tools, performance modeling, data analysis, and asphalt and concrete materials.
Almond Grove District Street Reconstruction, Town of Los Gatos, CA. Pavement Engineer. The Town of Los Gatos contracted NCE to prepare pavement design and PS&E to replace 100‐year‐old concrete streets in the historic Almond
Education
PhD, Civil Engineering,
University of Illinois, Urbana,
1995
MS, Civil Engineering,
University of Illinois, Urbana,
1986
BS, Civil Engineering, University
of Illinois, Urbana, 1984
Registrations/Certifications
Professional Engineer – Civil,
NV #23424
LEED Accredited Professional
Affiliations
American Concrete Institute
American Society of Civil
Engineers
Transportation Research Board
International Society of
Concrete Pavements
American Concrete Institute
Delmar L. Bloem Distinguished
Service Award (2018)
Joined NCE
2013
Years of Experience
35 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 32
Grove District. The purpose of the project was to address the deteriorated PCC pavements and ADA compliance issues, while preserving the historical and cultural identity of the neighborhood. The concept design phase for this high‐profile community project included evaluation of complete streets principles, including street design, typical sections, intersection design, stormwater management, and surface treatment concepts, for incorporation into the project. This project was highly visible and required continued community outreach and consideration of construction impacts due to the highly visible nature, public expectations, historical aspects, and potential impacts to parking and home access.
Measure M Street Rehabilitation, City of Berkeley, CA. Pavement Engineer. NCE implemented the City’s $30 million, multi‐year street surface seal, rehabilitation and reconstruction project, one of the City’s largest projects to date. The project included the development of pavement design and plans, specifications and estimate for more than 30 miles (150 street sections) of surface seal, street rehabilitation, and reconstruction. Complete street elements included new bike lanes, intersection reconfigurations, new pedestrian cross‐walks, storm drain improvements, and design of nearly 600 curb ramps, including pedestrian safety improvement bulbouts. NCE’s pavement design solutions offered cost savings and environmental benefits using rubberized paving products diverting tires away from landfills, use of longer lasting pavement materials, and using recycle in‐place technologies.
Prater Way and El Rancho Drive Resurfacing, Regional Transportation Commission of Washoe County, NV. Pavement Engineer. The project consisted of pavement resurfacing on Prater Way and a short section of El Rancho Drive. NCE investigated the use of a durable thin lift bonded Portland Cement Concrete (PCC) overlay on the El Rancho Drive section.
NCE performed hot mix asphalt concrete (HMAC) and Portland Cement Concrete (PCC) pavement analysis and design; plan, specification and cost estimate development and provided construction management and inspection.
Sustainable Pavements Program, Federal Highway Administration (FHWA). Co‐Principal Investigator. This ten‐year (Phase I and Phase II), multi‐task order IDIQ contract issued by the FHWA to promote the sustainability of pavements is a major initiative with the overarching goal of advancing the knowledge and implementation of sustainability considerations in pavements and pavement materials. The Sustainable Pavements Technical Working Group (SPTWG) is comprised of 20 representatives from key stakeholder groups, including federal and state government, academia, industry and research institutions. The SPTWG provides technical input to the FHWA—specific to sustainability and environmental aspects of pavements and materials—and to serve as a forum for information sharing and exchange. The Sustainable Pavements Reference Manual (http://www.fhwa.dot.gov/pavement/sustainability/hif15002/hif15002.pdf), of which Tom is the first author, is a 450‐page manual on implementation strategies to improve pavement sustainability.
Project NEON (I‐15/US 95 Reconstruction), Nevada Department of Transportation, NV. Pavement Engineer. NCE is the Pavement Designer for the Design‐Build consortium that has been awarded a $560 million contract by the Nevada Department of Transportation (NDOT) to construct Project NEON. This project is in downtown Las Vegas and extends 3.7 miles along I‐15 from Sahara Avenue to the US95/I‐15 Interchange. Tom leads the pavement design team responsible for the evaluation of the interstate pavement designs, design of all local roadways and providing broad technical support on all pavement issues including subgrade and materials.
Implementation of Best Practices for Concrete Pavements, Federal Highway Administration (FHWA). Co‐Principal Investigator. This is a multi‐year, multi‐task order IDIQ contract issued by the FHWA to promote concrete pavement technology. Thomas is one of the lead authors on the creation of the Concrete Pavement Notebook. The notebook addresses all elements of concrete pavement materials, design, construction, preservation, rehabilitation and is to be a compilation of updated current FHWA technical briefs, technical advisories and new stand‐alone documents that are to facilitate implementation of best practices by FHWA and State DOT engineers. The entire notebook will also be web‐ based for easy access.
Technology Transfer of Concrete Pavement Technologies, Federal Highway Administration (FHWA). Technical Expert.
This is a multi‐year, multi‐task order IDIQ contract issued by the FHWA to support the National Center for Concrete Pavement Technology. Thomas has multiple roles in this project including instructor for concrete overlay and concrete preservation workshops, preparation of commentary to support the development of an AASHTO Guide Document on Performance Engineered Concrete Mixtures, development of a new manual of concrete pavement distress, revision of the Integrate Materials and Construction Practices for Concrete Pavement: A State‐of‐the‐Practice Manual, and other outreach activities.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 33
Sharlan Montgomery Dunn, PhD, PE
Pavement Engineer
Dr. Sharlan Montgomery Dunn holds a PhD in civil engineering from Purdue University. She has eight years of experience in pavement design, management, and research work. After joining NCE in 2018, she has enjoyed working on pavement design and pavement management projects for local agencies and airports throughout California. She currently serves as a Project Engineer for various pavement management, maintenance, rehabilitation, design, and planning projects.
Sharlan is also MTC certified to perform pavement condition surveys and is the instructor for several of MTC’s StreetSaver® User Week workshops.
Representative Projects
2018 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Pavement Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million. Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Pavement Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
Pavement Rehabilitation/ Maintenance and Bikeway Improvements, Presidio Trust of San Francisco, CA. Project Engineer. NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform.
As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐ place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.
Education
PhD, Civil Engineering, Purdue
University, 2018
MS, Civil Engineering, Brigham
Young University, 2014
BS, Civil Engineering, Brigham
Young University, 2011
Registrations/Certifications
Professional Engineer – Civil,
CA #93268
MTC StreetSaver Rater
Certification Program
Affiliations
American Society of Civil
Engineers
Joined NCE
2018
Years of Experience
8 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 34
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Pavement Engineer. NCE has developed 5‐ Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
San Francisco International Airport On‐Call Pavement Engineering, City and County of San Francisco, CA. Project Engineer. Sharlan has been involved in a variety of field investigation and design work at the San Francisco Airport. These include pavement evaluation of Runway 1L‐19R, and Boarding Areas A and B, and evaluation and design of Taxiway B 3 and 4. These projects have involved a variety of destructive and non‐destructive testing (such as coring, deflection testing, and ground penetrating radar testing) and complex analyses and design using back calculation and FAA design software.
Valley View Avenue Rehabilitation Project, City of La Mirada, CA. Project Engineer. NCE provided pavement evaluation and design services Valley View Avenue, a highly traveled commercial corridor nearly a mile long with heavily deteriorated pavement. A pavement condition survey was conducted with distresses identified along with areas for potential base repairs. Coring, sampling and laboratory testing was performed, and a pavement design and soils investigation report were prepared and included potential treatments with a focus on sustainable treatments and cost saving measures. Technical specifications were provided.
Broadway and Parkside Rehabilitation, City of Walnut Creek, CA. Project Engineer. This project included rehabilitation recommendations for approximately two miles of arterial streets in downtown Walnut Creek that exhibited a variety of distresses ranging from minor to severe failure mechanisms. Pavement design tasks included pavement condition surveys, coring, non‐destructive pavement deflection testing, design, and base repair location identification. NCE also provided civil design services for these street sections. Based on structural analyses and constructability issues, the recommended treatments included primarily traditional mill and overlay with base repairs with some portions of surface reconstruction.
Laurel Road Resurfacing, City of Oakley, CA. Project Engineer. NCE provided engineering services for a mile‐long section of Laurel Road between O’Hara Avenue and Empire Avenue. Laurel Road is a 4‐lane arterial street that serves as a key connector to Highway 4 and provides access to neighborhoods as well as an elementary school. The street has experienced areas of fatigue cracking and roughness over the past decade. The current pavement section is inadequate to structurally support the current and expected growth in truck traffic as nearby areas will be further developed. As the pavement lead on this project, Sharlan performed pavement evaluation, testing, and pavement design for this portion of Laurel Road. Several rehabilitation options were presented to the city based on mechanistic empirical as well as Caltrans Highway designs. Ultimately, the city and NCE determined that a surface reconstruction with RHMA as the surface level would be the most cost‐effective and appropriate method for increasing the structural capacity of Laurel Road.
Pavement Management Update and Transportation Infrastructure and Rehabilitation Program (TRIP), City of Davis, CA. Project Engineer. In addition to updating the pavement management program for the city, Sharlan has been responsible for the pavement design of several residential and arterial streets as well as bike paths. This three‐year contract with the city includes performing pavement management, pavement design, and civil design services from 2018‐ 2021. Sharlan was involved in and managed many of the following design tasks: pavement condition surveys, coring, non‐ destructive pavement deflection testing, laboratory material evaluation, design, and base repair location identification.
The pavement design projects for each year are divided into separate bid packages for slurry seals, and rehabilitation and reconstruction to attract more contractors and minimize contractor mark‐ups on sub‐contractors.
Pavement Management System Development and Updates , Various Cities and Counties, CA. Project Engineer. Sharlan has been involved in developing and updating Pavement Management System (PMS) plans for cities and counties throughout California. She has been responsible for pavement distress data collection, analysis, and QC; M&R decision tree development with treatment unit cost estimates; budget scenario analyses; report preparation; and presentations.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 35
Paola Murillo
Staff Engineer
Paola Murillo has been involved in numerous civil design projects for rehabilitation and reconstruction street programs that include field data collection, base repairs, roadway striping design, new curb ramps, curb and gutter repairs, sidewalk repairs, and bike and pedestrian improvements. Paola has experience in AutoCAD, ArcGIS, Solid Works, Microsoft Office, technical writing, literature review, OpenPave, EverFE, and MATLAB.
Representative Projects
Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. Project Engineer/Technical Lead. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.
Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes.
NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate. 2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. Staff Engineer. NCE has been providing to the City a full range of pavement management services including development of a 5‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. To date we have developed pavement design and civil design for rehabilitation and preventive maintenance of 48 miles (more than 200 street sections) of City streets with a construction cost of over $14 million. Starting in 2017 to present for the City’s Pavement Management Program NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, sidewalk replacement, pavement design recommendations, PS&Es, and bidding and construction support services.
2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. Staff Engineer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. Staff Engineer. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement
Education
BS, Civil Engineering with a
minor in Construction
Engineering and Management,
University of California, Davis,
2018
Joined NCE
2019
Total Years of Experience
2 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 36
management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
Pavement Rehabilitation/Maintenance and Bikeway Improvements, Presidio Trust of San Francisco, CA. Staff Engineer.
NCE is designing the Presidio Trust’s pavement rehabilitation and maintenance project with redesign of the bicycle land network. The scope for this project includes preparing PS&Es for bidding purposes. Design elements of the project include pavement design, a roundabout, extensive modification to existing striping and markings to introduce class II and III bikeways and an advisory bike lane, roadway grading, drainage solutions and design, and a bus platform. As part of this project, NCE introduced cost‐effective and sustainable pavement treatment alternatives, such as cold in‐place recycling (CIR) that allows the asphalt concrete to be recycled in‐place offering up a green technology that recycles existing onsite materials, reduces costly truck trips for import of asphalt paving materials, and reduces greenhouse gases and energy usage. The pavement design considered a number of different factors, including medians, curb reveal, depth to underlying concrete, previous overlays and fabric materials, AB thickness, and other buried obstructions, such as rail lines and recommended an appropriate pavement treatment.
Yellow Brick Road Complete Streets, City of Richmond, CA. Staff Engineer. The Yellow Brick Road Complete Streets Project proposes to address key community‐identified barriers, issues, and opportunities in the community in order to design and implement complete streets improvements along roadways in the community‐identified Yellow Brick Road network. The routes will connect the key assets in the neighborhood, including local elementary schools, parks, and transit. Improvements include Class II bicycle facilities, extended sidewalks, decorative crosswalks, pedestrian and bicycle wayfinding signs, pedestrian‐scale lighting, landscaping, curb extensions, roundabouts and traffic circles, ADA curb ramps, speed tables, raised intersections and crosswalks, rectangular rapid flashing beacons, median refuges, back‐in angled parking, green painted bicycle lanes, landscaped median refuges, and trail crossings. In addition, innovative design elements include raised crosswalks and intersections as traffic‐calming measures and a HAWK (High‐Intensity Activated crossWalK) beacon at an intersection with heavy vehicle and pedestrian interactions where a traditional signal cannot be installed.
2020/21 Pavement Rehabilitation, Town of Moraga, CA. Staff Engineer. NCE performed civil and limited pavement design services to develop the project plans, technical specifications, and engineer’s estimate on behalf of the Town.
Staff quality controlled the base repair locations and updated final markings in white paint. Final locations were collected electronically with GPS along with the updated dimensions. The project included improvements for nine curb ramps, with one requiring a custom detail in the plans. Staff performed QC on the Town’s preliminary curb ramp designs and prepare final edits, as needed. NCE and Town staff also conducted a site walk to review existing conditions to confirm pavement design treatments and curb ramp designs, based on visual assessment. NCE was asked to provide support services during construction. Services include attendance at the pre‐construction meeting, reviewing Contractor material submittals, responding to Contractor requests for information, field marking and verifying measurement of base repair (digout) areas, providing recommendations for any necessary construction changes due to unforeseen field conditions, assisting with the review of Contract Change Orders, and Prepare and submit record drawings based upon the Contractor's representation of actual construction (one printed copy and one electronic copy in AutoCAD and PDF formats). Paola was responsible for transposing the design data gathered (e.g., base repairs, curb and gutter repairs, existing striping and markings, and existing utilities) onto the plans, while concurrently populating the engineer’s estimate.
Point Molate Beach Park Erosion Assessment, City of Richmond, CA. Staff Engineer. The City retained NCE to provide engineering services to restore a section of shoreline at the Point Molate Beach Park. The NCE team prepared an erosion assessment and alternatives study to determine cost‐effective shore restoration measures that could be permitted. NCE is working with regulatory and permitting agencies to provide the appropriate design that can be implemented at the earliest possible time to stop the advancing beach erosion at the site.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 37
Alejandro (Alex) Paez
CAD Designer
Alex Paez is CAD Designer with 20+ years of extensive experience. He has provided CAD for pavement rehabilitation and reconstruction projects for local cities throughout the Bay Area. Alex has worked on seismic retrofits for both commercial and residential structures and highway and rail infrastructure projects for Caltrans.
Representative Projects
2017 to 2022 Street Surface Seal and Rehabilitation Projects, City of South San Francisco, CA. CAD Designer. NCE has been providing to the City a various of pavement management services including development of a multi‐year Paving Work Plan, updating the City’s maintenance and rehabilitation decision tree, evaluating alternative pavement treatment technologies, and development of construction documents for bidding. In 2017 to 2021 pavement management programs, we have developed pavement design and civil design for surface seal and rehabilitation of 48 centerline miles (more than 200 sections) of City streets with a construction cost over $14 million. In addition, NCE has modified City’s Street Saver database and updated historical maintenance and rehabilitation records to perform budget analyses and develop multi‐year work plan. Recently, City’s 6‐Year Work Plan was updated based on City’s budget, rehabilitation strategy and candidate streets are grouped by maintenance zone for efficiency of design, construction (less mobilization), future maintenance, and to be able to resurface more streets with a limited pavement resurfacing annual budget. NCE has provided pavement and civil design services for preventive maintenance on City streets with scrub, slurry, and cape seals and rehabilitation of City streets with mill and overlays as well as surface reconstruction. 2022 West Highway 101 Pavement Rehabilitation Project, City of South San Francisco, CA. CAD Designer. NCE is providing engineering and design services to facilitate a rehabilitation project of all eligible streets west of 101. The 2022 West of 101 Pavement Rehabilitation Project’s goal is to perform deferred maintenance west of 101, outside of the annual surface seal program. The City is responsible for the maintenance and repair of approximately 140 centerline miles, comprised of 33 arterial miles, 39 collector miles, and 68 residential miles. The City utilizes a program of slurry seals, overlays and surface reconstruction as maintenance and rehabilitation strategies. West of US101 there are approximately 123 centerline miles, comprised of 23 arterial miles, 35 collector miles, and 65 residential miles. Every two years the City surveys the streets and enters the data into the South San Francisco Pavement Management Program (PMP) StreetSaver® database program. NCE is responsible for project management, pavement rehabilitation design, PS&E, and bidding and construction support services.
FY20/21 and FY21/22 Pavement Resurfacing Program, City of Pacifica, CA. CAD Designer. NCE has developed 5‐Year work plan for the City with surface seal and rehabilitation projects based on City’s SB1 funding, as well as pavement management database review and unit cost update. Field reviews were performed to verify pavement condition and treatments to finalize the work plan. NCE then scheduled field calibration meeting with City staff to discuss various surface seal applications and base repair criteria. Cost‐effective cape seal with leveling courses were designed on residential streets with lower PCI to prevent water from damaging pavement and help resisting reflective cracking. As part of this project, NCE civil and pavement engineering design services included pavement coring, curb/gutter replacement, utility coordination, curb ramp design, drainage improvements, pavement design recommendations, PS&Es, and bidding and construction support services.
Annual Overlay/Rehabilitation, 2017‐2018 and 2020‐2021 Pavement Design and PS&E, City of San Leandro, CA. CAD Designer. NCE prepared construction documents and pavement rehabilitation and reconstruction design for 23 arterial, collector, and residential streets (5 miles). NCE’s scope of work included pavement investigation and design and preparation of civil design PS&Es for construction. Pavement design solutions included conventional and rubberized hot mix asphalt overlays, full‐depth asphalt reconstruction, FDR in lieu of more expensive conventional reconstruction, and
Education
AAS, ITT Technical Institute,
Rancho Cordova, CA, 1991
Joined NCE
2014
Years of Experience
20 years
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 38
a pilot project for cold central plant recycling (CCPR) on an arterial street based on recommendations provided by NCE.
Visible drainage issues were addressed, such as localized ponding in the gutter pan, the design of over 100 ADA ramps, curb and gutter repairs, and improvements to striping and pavement markings with the addition of class II and class IV bike lanes. NCE submitted and managed three encroachment permit applications with Caltrans as the project encroached on three state routes. NCE’s engineer’s estimate matched that of the winning contractor bid, indicating that NCE was able to anticipate the value of the scope of work and contractor climate.
Mill Valley Sausalito Multi‐Use Trail, County of Marin, CA. CAD Designer. NCE was initially selected by the County to provide treatment recommendations for temporary rehabilitation strategies for portions of the 1.8‐mile Mill Valley – Sausalito Multiuse Path that are typically underwater during king tides. The County then asked NCE to prepare plans, specifications and cost estimate (PS&E) from Gate 6 Road to Almonte Blvd based upon our initial recommended Option 1A‐ “Micromill Surface and Type 2 Mircosurfacing.” This surface seal recommendation is a stop gap interim maintenance measure for the Trail and will have a short‐term design life (a few years) due to the frequent tidal inundation of the path.
Transportation Infrastructure and Rehabilitation Program (TIRP), City of Davis, CA. CAD Designer. This project involved producing pavement rehabilitations for 698 street sections in Davis from 2015 to 2020 with a construction cost over $18.5 million. The project involved non‐destructive pavement deflection testing, pavement coring, pavement condition surveys and base repair location identification. Following the collection of the field data, rehabilitative recommendations were made based on each street segment’s structural integrity and performance. Recommendations for each section were summarized in a pavement design report and submitted to the City. In addition, NCE has updated City’s pavement management program (PMP) in 2015 and 2018 and was recently selected to perform the City’s 2021 PMP update.
Parking Lot Rehabilitation and ADA Upgrades at Kids Castle Center, Contra Costa County, Pittsburg, CA. CAD Designer.
NCE is providing civil engineering design services associated with replacement/rehabilitation of the pavement within the parking lot, as well as American with Disabilities Act (ADA) upgrades, and improvements to curb and gutter and drain inlet at the Kid's Castle Center. NCE is preparing plans and specifications suitable for public bidding for pavement rehabilitation to address failed pavement and flatwork to address ADA parking, ADA compliant path of travel, and accessibility to the facility. The pavement of the parking lot at the facility shows various signs of structural failure including alligator cracking. In addition, the ADA parking and path of travel is not to current standards and is in need of upgrades.
The parking lot is roughly 115 feet in length in the east‐west direction, and about 65 feet in the north‐south direction. It has one lane for vehicle travel, and two parking lanes.
Parking Lot Rehabilitation and ADA Upgrades at YV Library, Contra Costa County, Walnut Creek, CA. CAD Designer. NCE is providing civil engineering design services associated with replacement/rehabilitation of the pavement within the parking lot, as well as American with Disabilities Act (ADA) upgrades, and improvements to curbs at the Ygnacio Valley Library parking lot. NCE is preparing plans and specifications suitable for public bidding for pavement rehabilitation to address failed pavement and flatwork to address ADA parking, ADA compliant path of travel, and accessibility to the facility. The pavement of the parking lot at the facility shows various signs of structural failure including alligator cracking.
In addition, the ADA parking and path of travel is not to current standards and is in need of upgrades. The parking lot is L‐shaped and roughly 245 feet in length in the east‐west direction, and about 270 feet in the north‐south direction. The entire project area including hardscape, parking area, and landscaping is approximately 1.3 acres. The parking area next to Oak Grove Road has one lane for vehicle travel, and two parking lanes. The parking area to the southeast of the library building has two travel lanes and 3 parking lanes.
Rumrill Boulevard Complete Streets and Green Infrastructure Project, City of San Pablo, CA. CAD Designer. NCE is designing an approximately $15 million in construction value, 2.5‐mile‐long complete streets project along Rumrill Boulevard. Key project elements include landscape buffers, widened bus stop landings, increasing parking, and video detection at traffic signals for vehicles and bicycles. In addition, the project will include LID design and bioretention basins, landscaping improvements, curb extensions/bulbouts, sidewalk widening, crosswalk improvements with rectangular rapid flashing beacons, median refuges bus stop shelters, expanded street lighting, ADA concrete and roadway improvements (curb ramps, sidewalks, driveways, medians, and regrading pedestrian roadway crossings), storm drainage improvements, trail crossings, wayfinding signs, pedestrian and street lighting. A critical element of the project was integrating significant Green Infrastructure (GI) to improve localized drainage and achieve targets set by the Municipal Regional Permit.
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | 39
4) Fee Schedule
Street List
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 40
Proposed Project Schedule
We understand that this resurfacing project is to be designed by February 2023, bid mid‐winter, and construction starting in summer 2023. We anticipate completing Issued for Bidding PS&E by February 2023 providing a notice to proceed is received no later than May 4th, 2023, as shown in the attached detailed schedule.
City of Daly City
2022‐2023 Street Resurfacing Project
April 5, 2022
Page | 42
City of Daly City
2022 – 2023 Street Resurfacing Project
April 5, 2022
Page | 43
5) Preliminary Sheet List and Technical Specifications Sections NCE proposed the following sheet list in our 2016 Street Resurfacing Project with the City:
1. Cover Sheet
2. Notes, Legend, and Abbreviations
3. Core Summary Table
4. Civil Improvement Layouts (Plan only)
5. Striping Improvement Layouts
6. Civil and Striping Details
7. Custom Curb Ramp Details
Recognizing that the 2022‐2023 Street Resurfacing Project planset is slightly different we would propose the following changes to this year’s gameplan:
1. The civil improvement layouts would have plan and profile.
On the proposed alternative, only the reconstruction streets (FDR) and streets with drainage improvements would be shown with plan and profile. When there would
be no regrading of the street (mill and overlay or surface reconstruct) only plan view will be laid out.
2. The striping improvement layout would only apply to Carter St (arterial). Minor striping on other streets will be included in the respective civil improvement layouts.
The scope of work anticipated for the 2022‐2023 Street Resurfacing Project may include similar technical specifications to the 2016 resurfacing project such as; mobilization, clearing and grubbing, traffic control, remove existing thermoplastic striping and markers, adjust existing utility covers and frame to finish grade, concrete improvements (curb and gutter, curb ramps, detectable warning surface retrofit), full depth base repairs, cold planing (milling), crack sealing, remove surfacing and base, subgrade preparation, hot‐mix asphalt overlay, thermoplastic striping and pavement markings, and pavement markers. Due to observed fatigue cracking and subgrade material pumping and other existing conditions additional technical specification sections may include full‐depth reclamation, cement or lime stabilization (if needed), rubberized hot‐mix asphalt, cape seal, or microsurfacing. 6) Required Statements
This proposal shall remain effective for ninety (90) days from beyond the date of submittal.
Collaboration. Commitment. Confidence.
www.ncenet.com
City Council Agenda Report Item #
Meeting Date: May 9, 2022
Subject: Setting the Time and Place of the Public Hearing for Daly City’s National Pollutant Discharge Elimination System Program Regulatory Fee Recommended Action
It is recommended the City Council set the time and place of a public hearing for 7:00 p.m., June 13, 2022 to review the local National Pollutant Discharge Elimination System (NPDES) Stormwater Regulatory Fee.
Background
The San Francisco Regional Water Quality Control Board issued a consolidated Bay Area Municipal Regional Permit (MRP) on November 19, 2015. The permit conditions mandate numerous and costly municipal stormwater management activities over the following five years. The City/County Association of Governments continues to administer the General Program components. Each municipality is responsible for achieving specific program activities and filing an annual report on city specific and county-wide compliance activity. The City first established a stormwater fee in 1995 several years after the NPDES regulatory program was initially established in 1991 in order to finance the many new municipal activities required under to comply with this program.
Discussion
Since 1995, Daly City utilized the regulatory fee structure adopted in Ordinance No. 1219 to finance local specific activities to comply with mandated Stormwater Program requirements. This fee structure has not been amended or increased at any time in the past 26 years. This fee structure remains as follows for each Assessor Parcel Number:
Single Family/Duplex $9.80 Multi-Family (11-20 units) $36.76 Unimproved Land $4.90 Commercial/Retail/Manufacturing $56.84 Multi-Family (3-10 units) $19.60 Condominiums $4.90 On an annual basis, this local fee generates approximately $449,000. Its structure is based on the correlation between parcel size, land use and stormwater runoff, with the base fee assigned to single family/duplex parcels as they are the City’s predominant land use. To allocate costs proportionately, all other categories of use are assigned a factor compared to single family/duplex and take into account street frontage, impervious surface coverage and vehicle trips.
From its prior action, the City Council already authorized continued use of the San Mateo County Flood Control District to collect charges associated with the Countywide NPDES General Program.
Staff is available to provide any additional information desired by the Mayor or City Council members.
Public Hearing: NPDES Local Program Regulatory Fee
Meeting Date: May 9, 2022
Respectfully submitted,
Sibely Calles Richard Chiu, Jr.
Senior Management Analyst Director of Public Works
City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Approve FY 2022-23 Project List for Road Maintenance and Rehabilitation Account Funds Authorized Under SB 1
Recommended Action
Recommend the City Council adopt a Resolution approving the FY 2022-23 Project List for SB 1 Road Maintenance and Rehabilitation Account Funds
Background/Discussion
SB 1 (Beall) was filed with the Secretary of State on April 28, 2017. The bill established a Road Maintenance and Rehabilitation Account (RMRA) in the State Transportation Fund that is intended to address deferred maintenance on the state highway system and the local street and road network.
As written, SB 1 requires the California Transportation Commission (CTC) adopt criteria to ensure efficient use of these funds. The RMRA funds will be provided to cities on a monthly basis along with traditional gas tax monthly disbursements, with the first distribution in January 2018.
A city or county must submit a project list and supporting documentation to the CTC each year, which means the FY22-23 project list will need to be submitted by July 1, 2022. Public Works staff recommends using the RMRA funds for the next annual slurry seal and resurfacing projects projected for completion in the summer/fall of 2023. Staff has identified the Westlake Street Slurry Seal, the 2022-23 Street Resurfacing project, the 2023-24 Street Resurfacing project, and the 2020- 21 Street Resurfacing Project as projects to be designed and/or constructed in the FY 2022-23 cycle. All projects are identified in the City’s ten-year Capital Improvement Plan (CIP).
Fiscal Impact
The approval of this recommendation will satisfy the CTC Project List requirement to receive SB1 funds in the amount of approximately $2.4 million.
Summary/Conclusion
Recommend the City Council adopt a Resolution approving the FY 2022-23 Project List for SB 1 Road Maintenance and Rehabilitation Account Funds.
Staff is available to provide any additional information desired by the Mayor or Councilmembers.
Approve FY 2022-23 Project List for Road Maintenance and Repair Account Funds Authorized Under SB 1
Meeting Date: May 9, 2022
Respectfully submitted,
Sibely Calles Richard Chiu
Senior Management Analyst Director of Public Works
Attachments: Westlake Street Slurry Seal Project Location Map 2020-21 Street Resurfacing Project Location Map
2022-23 Street Resurfacing Project Location Map
2023-24 Street Resurfacing Project Location Map
Draft Resolution
PROJECT LOCATION MAPCITY OF DALY CITY2022-23 WESTLAKE SLURRY SEAL
SAN MATEO COUNTY, CALIFORNIA
2022-23 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIA
SAN FRANCISCOCITY OF SOUTH
DALY CITYCALTRANS
DALY CITYCALTRANS
Feet1" = 1000'-0"200010000500
LEGENDSELECTED STREET SECTION
2020-21 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIA
2024 STREET RESURFACINGSAN MATEO COUNTY, CALIFORNIACITY OF DALY CITYPROJECT LOCATION MAP
RESOLUTION NO._______
RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022-23 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of Daly City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the City of Daly City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Daly City, will receive an estimated $2.4 million in RMRA funding in Fiscal Year 2022-23 from SB 1; and
WHEREAS, this is the 6th year in which the City of Daly City is receiving SB 1 funding and will enable the City of Daly City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of Daly City has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and
WHEREAS, the City of Daly City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City of Daly City maintain and rehabilitate approximately 18 miles of street pavement in the Westlake Street neighborhood and throughout the City of Daly City this year and dozens of similar projects into the future; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City of Daly City’s streets and roads are in a “good” condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a “excellent” condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by City Council of the City of Daly City, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues:
The Westlake Street Slurry Seal project will apply surface seal to approximately 15 miles in the Westlake neighborhood (Map Attached). This project will be designed in the winter of 2022 and constructed in the summer of 2023. The useful life of the pavement treated with surface seal is approximately seven (7) years.
The 2022‐23 Resurfacing Project will overlay asphalt concrete and reconstruct with other treatment options to 17 streets in the Mission neighborhood, John Daly Blvd, Skyline Ave, and Alta Vista. (Map Attached). This project will be designed in the winter of 2022 and constructed in the summer of 2023. The useful life of the pavement with an overlay is approximately twenty (20) years.
The 2023-24 Street Resurfacing Project will repair and overlay street segments selected from the City's 5-year Master Plan for street repair and resurfacing in coordination with the City's Pavement Management System. Work will be done on Mission St, John Daly Blvd, Avalon Dr, and Palmdale. This project will be designed in FY2023. The useful life of the pavement with an overlay is approximately twenty (20) years.
3. The following previously proposed and adopted projects may also utilize Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Daly City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
The 2020-21 Street Resurfacing Project consists of overlay asphalt concrete and reconstruct with other treatment options to six (6) street segments (Map Attached). This project was designed in the winter of 2021 and will be constructed in the summer of 2022. The useful life of the pavement with an overlay is approximately twenty (20) years.
PASSED AND ADOPTED by the City Council of the City of Daly City, State of California this _______ day of _______, 2022, by the following vote:
-
City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Approval of the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue
Recommended Action
It is recommended that the City Council adopt a resolution to approve the Final Map – SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue Background
The Final Map – SUB-4-16-12037, One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue consists of the conversion of a portion of the vacant 9,736 square foot retail space at the street level of the existing building.
On April 11 th, 2005, the City Council approved the existing building at 2665 Geneva Avenue (between Calgary Street and Rio Verde Street) consisting of a mixed-use building with ground floor commercial uses and 72 residential rental apartments on the upper four levels of the building. At the time of approval, the commercial uses consisted of one 10,110 square foot retail unit facing Geneva Avenue and two retail units totaling 2,998 square foot facing Rio Verde Street. The square footage of the retail space was reduced to 9,736 square feet during the plan check process.
On July 1, 2008, a Tentative Map was approved for airspace subdivision of the 72 residential rental apartments and 3 retail units within the previously approved building. On July 13, 2009, the City Council accepted the public improvements and approved the Final Map for the Map of the Geneva - A Subdivision for Residential and Retail Condominium Purposes, which created the 72 residential condo units and 3 retail condo units.
On April 24, 2017, the City Council approved the Zone Change ZC-4-16-12036, Major Subdivision SUB-4-16-12037, Use Permit UP-4-16-12038, Design Review DR-4-16-12040, and Negative Declaration CEQA-4-16-12039 of the retail conversion to residential units at 2665 Geneva Avenue.
The project will convert a portion of the vacant 9,736 square foot retail space at the street level of the existing building to seven residential condo units and one 1,950 square foot retail condo unit, for a total of 79 residential condo units and 3 retail condo units.
Discussion
The subdivision of real property and requirement to prepare a Tentative and Final Map are established and regulated by the Subdivision Map Act (California Government Code Section 66410 et. seq.) and Title 16, Subdivisions, of the Daly City Municipal Code. The City Council approved a time extension for the Tentative Map on April 22, 2019 and was automatically extended for an additional 18 months by AB1561. The Tentative Map for 2665 Geneva is set to expire on October 24, 2022.
Approval of the Final Map Major SUB-4-16-12037,
A One-Lot Resubdivision for Condominium Purposes
at 2665 Geneva Avenue
Meeting Date: May 9, 2022
The public improvements required for the existing mix-use building were completed and accepted on July 13, 2009. There were no additional public improvements required with the approval of the Major Subdivision SUB-4-16-12037 on April 24, 2017. There are no subdivision improvements associated for the project and a subdivision improvement agreement will not be needed to record the Final Map. The First Amendment to Declaration of Restrictions (CC&R’s) has been reviewed and approved by the City Attorney and the Engineering Department.
Fiscal Impact
The Subdivider is required to pay the following fee types as a part of the entitlement process for this subdivision.
Park-in-lieu fees
Building Permit fees
Plan and Map check fees
DWWR fees
AB-1600 fees
All fees have been paid or will be paid at the time of building permit. Building Permits will not be issued until all applicable fees have been paid. All work will be paid for by the Subdivider.
Summary/Conclusion
The Final Map have been reviewed by the City and meet all legal requirements and Conditions of Approval.
It is recommended that the City Council adopt a resolution to approve the Final Map SUB-4-16-12037, A One-Lot Resubdivision for Condominium Purposes at 2665 Geneva Avenue Respectfully submitted,
Roland Yip, P.E. Richard Chiu, Jr., P.E.
Senior Civil Engineer Director of Public Works
Attachment: Attachment 1 – Final Map SUB-4-16-12037
City Council Agenda ReportItem # _____
Meeting Date: May 9, 2022
Subject: Authorize the City Manager to Execute a Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project Recommended Action
Staff recommends that the City Council authorize the City Manager to execute an agreement and any amendments, in an amount not to exceed $137,445 for professional services with CSG Consultants Inc. (CSG), of Foster City, California, to provide engineering design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.
Background
The San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project includes the replacement of approximately 1,600 feet of existing 2-inch to 4-inch cast and galvanized iron water main with new 6-inch to 8-inch lines. The project limits are along Santa Cruz Avenue and San Diego Avenue between the city limits and Hillcrest Drive, and Guadalupe Avenue between Santa Cruz Avenue and San Diego Avenue. The installation of the new water lines will address fire flow and aging infrastructure issues in the project area.
Discussion
Staff released a Request for Proposals (RFP) for design services on February 15, 2022 to 18 firms from the City’s 2021 General Engineering short list with expertise in water main replacement design. Seven firms submitted proposal by the due date of March 25, 2022. A panel consisting of staff from the Public Works and Water and Wastewater departments evaluated the proposals on their technical merits. The panel determined CSG has the experience and qualifications that most closely met the needs of the project.
The scope of work with CSG under this professional services agreement includes the following:
Geotechnical services including field exploration, laboratory testing, engineering analyses, and report preparation;
Utility field verification (potholing) and utility conflict resolution; Topographic survey of the immediate surroundings, identifying structures, utilities, and any prominent features that will affect the replacement of the water mains; Coordinate with utility agencies to help avoid potential construction delays and unnecessary disruptions to public services;
Assess the suitability for trenchless replacement for the existing utility; Develop design plans, specifications, and construction cost estimates (PS&E) and Bid construction and support.
Authorizing Professional Services Agreement for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project Meeting Date: May 9, 2022
Fiscal Impact
The professional services agreement provides a not-to-exceed fee of $124,950. This amount includes geotechnical services, utility field verification, topographic survey, and design services.
An additional $12,495 (10%) is needed for contingency which brings the total cost to $137,445.
Sufficient funds are available in the FY 2021-22 Water Fund – San Diego/Santa Cruz/Guadalupe projects account 41-385-758 for this professional services contract.
Summary/Conclusion
Staff recommends that the City Council authorize the City Manager to execute an agreement and any amendments, in an amount not to exceed $137,445 for professional services with CSG Consultants Inc., of Foster City, California, to provide engineering design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.
Staff is available to provide any additional information desired by the Mayor or Councilmembers.
Respectfully submitted,
Mike Burnfield Richard Chiu Jr.
Engineer 1 Director of Public Works
Attachments:
1. Project Location Map
2. CSG Consultants Professional Services Agreement
-1-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
AGREEMENT WITH CSG CONSULTANTS
FOR DESIGN PROFESSIONAL SERVICES
FOR
City of Daly City
This Agreement, made and entered into this ____ day of __________, 2022 (the “Effective Date”) by and between the CITY OF DALY CITY , a municipal corporation existing under the laws of the State of California (”CITY"), and CSG C onsultants, a California S-Corporation ("CONSULTANT"):
CSG Consultants
550 Pilgrim Drive
Foster City, CA 94404
R E C I T A L S :
A. CITY desires certain construction document serv ices hereinafter described as the design services for the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project.
B. CITY desires to engage CONSULTANT to provide th ese consulting services by reason of its qualifications and experience for per forming such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, the proposal from C SG Consultants dated April 21, 2022, attached and incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professiona l quality, technical accuracy and coordination of all work furnished by CONSULTANT un der this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furni sh the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
-2-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by CONSULTAN T and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT'S work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on the Effective Date and be completed within two (2) years.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services ren dered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT, on a time and materials basis, pursuant to rates stated in Exhibit A to this Agreement attached and incorporated by reference. In no event shall CONSU LTANT’s total compensation under this Agreement exceed one hundred twenty-four thousand nine hundred and fifty dollars ($124,950).
SECTION 6 – TERMINATION
Without limitation to such rights or remedies as CI TY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspe nd work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY'S payment of the amo unt required to be paid, documents become the property of CITY, and CONSULTANT shall t ransfer them to CITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by CONSULTANT in the perform ance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - INDEPENDENT CONTRACTOR
It is understood that Consultant, in the performanc e of the work and services agreed to be performed, shall act as and be an independent contr actor and shall not act as an agent or employee of the City. Consultant shall obtain no r ights to retirement benefits or other benefits which accrue to City's employees, and Consultant he reby expressly waives any claim it may have to any such rights.
-3-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
SECTION 9 - CONFIDENTIALITY
All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by C ITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.
SECTION 10 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no inter est, and shall not acquire any interest, direct or indirect, financial or otherwise, which w ould conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 11 – USE OF SUBCONSULTANTS
CONSULTANT shall not subcontract any services to be performed by it under this Agreement without the prior written approval of the CITY, exc ept for service firms engaged in drawing, reproduction, typing, and printing. CONSULTANT sha ll be solely responsible for reimbursing any subconsultants and the CITY shall have no obligation to them.
SECTION 12 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of t he professional services required under this Agreement, CONSULTANT shall at all times be conside red an independent CONSULTANT as defined in Labor Code Section 3353, under control o f the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 13 – SB 1383 COMPLIANCE
To the extent applicable, CONSULTANT shall comply w ith the requirements set forth in SB 1383 and Public Contracts Code Section 22150 for th e procurement of recycled paper products.
To the extent that the fitness and quality are equa l, CONSULTANT shall purchase recycled products, as defined in Public Contracts Code Secti on 12200 instead of nonrecycled products.
Upon completion of the term of this Contract, CONSULTANT shall provide records to the CITY demonstrating compliance with this section, includi ng copies of all invoices, receipts, or other proofs of purchase that detail the procurement of paper products.
SECTION 14 - INDEMNITY
To the fullest extent permitted by law (including, without limitation, California Civil Code Sections 2782 and 2782.6), Consultant and Consultan t’s sureties agree to defend (with legal counsel acceptable to the City), indemnify and hold harmless the City, its officers, agents, officials, representatives, employees and volunteer s (collectively “Indemnitees”) from and
-4-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
against any and all claims, demands, actions, losse s, damages, injuries, and liability, direct or indirect (including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses and fees of ex pert consultants or expert witnesses incurred in connection therewith and costs of investigation), t hat arise out of, pertain to, or relate to, directl y or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Consultant, any Subconsultant, anyone directly or i ndirectly employed by them, or anyone that they control (collectively “Liabilities”). Such ob ligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the ext ent that such Liabilities are arise out of the sole negligence, active negligence, or willful misconduct of Indemnitee.
Acceptance by the City of the work performed under this Agreement does not operate as a release of Consultant from such professional resp onsibility for the work performed pursuant to this Agreement.
The duty of Consultant and its sureties to indemni fy and hold harmless as set forth above, shall include the duty to defend as set forth in Se ction 2778 of the California Civil Code, provided, however, that nothing herein shall be con strued to require the Consultant to indemnify the City, its subsidiary districts, its officers, a gents or employees against any responsibility for liability in contravention of Section 2782 of the C alifornia Civil Code. To the extent there is an obligation to indemnify under this Section, Consult ant shall be responsible for incidental and consequential damages resulting directly or indirec tly, in whole or in part, from Consultant’s negligence, recklessness, or willful misconduct.
Consultant and its sureties expressly and specific ally agree to waive any and all subrogation rights it may have against the City, it s subsidiary districts, officers or employees.
Indemnification and waiver of subrogation contained in this section shall remain operative and in full force and effect regardless of any termination of this Agreement.
SECTION 15 - INSURANCE
CONSULTANT shall procure and maintain for the durat ion of the contract and three years thereafter (five years for building or major improv ements) insurance against claims for injuries to persons or damages to property which may arise f rom or in connection with the performance of the work hereunder and the results of that work by the CONSULTANT, his agents, representatives, employees or subcontractors.
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL) : Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, inc luding products-completed operations, personal & advertising injury, with lim its no less than $2,000,000 per occurrence. If a general aggregate limit applies, e ither the general aggregate limit shall apply separately to this project/location or the ge neral aggregate limit shall be twice the required occurrence limit.
-5-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1) , or if CONSULTANT has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statut ory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the CONSULTANT.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, empl oyees, and agents are to be covered as insureds on the auto policy for liability arising out of au tomobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or o n behalf of the CONSULTANT including materials, parts or equipment furnished in connecti on with such work or operations. General liability coverage can be provided in the form of a n endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and ap pointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.
Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of any ri ght to subrogation which any insurer of said CONSULTANT may acquire against the City by vir tue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any en dorsement that may be necessary to effect this waiver of subrogation, but this provisi on applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
-6-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverag e with a lower deductible or retention or provide proof of ability to pay losses and relat ed investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a curr ent A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Claims Made Policies (note – should be applicable only to professional liability, see below) If any of the required policies provide claims-made coverage:
1. The Retroactive Date must be shown, and must be bef ore the date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insura nce must be provided for at least five (5) years after completion of the contract of work.
3. If coverage is canceled or non-renewed, and not rep laced with another claims-made policy form with a Retroactive Date prior to the contract Effective Date, the CONSULTANT must purchase “extended reporting” cover age for a minimum of five (5) years after completion of work.
Verification of Coverage
CONSULTANT shall furnish the City with original cer tificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received an d approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONSULTANT’s obligation to prov ide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
SECTION 16 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement i s for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontract ed by CONSULTANT without the prior written consent of CITY.
SECTION 17 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to pe rform the work agreed to be done under this Agreement and that CITY relies upon the skill of CO NSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation.
-7-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
SECTION 18 - WAIVERS
The waiver by either party of any breach or violati on of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, covenant, condition, ord inance or law or of any subsequent breach or violation of the same or of any other term, conditi on, ordinance, or law. The subsequent acceptance by either party of any fee or other mone y which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 19 – SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
SECTION 20 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of a ttorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardles s of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that n either party shall have to pay the other more than $5000 for attorney fees arising out of an action, o r actions to enforce the provisions of this Agreement.
SECTION 21 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment o pportunity. Neither CONSULTANT nor any of its subconsultants shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap , medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualific ation pursuant to the California Fair Employment and Housing Act.
SECTION 22 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation wit hin 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absen ce of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed -upon service. The mediator shall be selected by a blind draw.
-8-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to f ile a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the media tor, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.
SECTION 23 - LITIGATION
CONSULTANT shall testify at CITY'S request if litig ation is brought against CITY in connection with CONSULTANT'S services under this Ag reement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT'S wrongd oing, CITY shall compensate CONSULTANT for preparation for testimony, testimony , and travel at CONSULTANT'S standard hourly rates at the time of actual testimony.
SECTION 24 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: City Engineer
City of Daly City
Public Works – Engineering Division
333 90
th Street
Daly City, CA 94015
To CONSULTANT: Hatem Ahmed
CSG Consultants
555 Pilgrim Drive
Foster City, CA 94404
SECTION 25 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, r epresentations, and agreements, either written or oral.
This document may be amended only by written instru ment, signed by both CITY and CONSULTANT.
-9-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
SECTION 26 – AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party war rants that the individuals who have signed this Agreement have the legal power, right, and aut hority to make this Agreement and to bind each respective party.
SECTION 27 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
IN WITNESS WHEREOF, CITY and CONSULTANT have execut ed this Agreement the day and year first above written.
CITY OF DALY CITY CON SULTANT
CSG Consultants
_______________________________ _________ ________________________ Shawnna Maltbie Cyrus Kianpour
City Manager President
APPROVED AS TO FORM
_______________________________
Rose Zimmerman
City Attorney
-10-
Revised 02/25/22
G:\Projects\Water\Santa Cruz San Diego Guad\Design\15-Design Consultant\03-Agreement\2022 CSG\CSG-Agreement SC, SD, Guad Water- R1.doc
EXHIBIT A
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT
Table of Contents
S E C T I O N 1 Letter of Transmittal
S E C T I O N 2 Firm Profile and Project Team
S E C T I O N 3 Relevant Experience
S E C T I O N 4 Project Approach, Organization, & Local Presence
S E C T I O N 5 Appendix: Resumes
S E C T I O N 6 Cost Proposal (Separate Submittal)
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 550 Pilgrim Drive, Foster City, CA 94404
phone (650) 522-2500 | fax (650) 522-2599 | www.csgengr.com Letter of Transmittal
April 21, 2022
Michael Burnfield, Engineer 1
City of Daly City – Engineering Division
333 – 90th Street
Daly City, CA 94015
RE: San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project CSG Consultants, Inc. (CSG) is pleased to present our revised proposal to provide engineering services for San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project (Project) for the City of Daly City (City).
We understand the City is seeking a qualified firm to provide professional services for the design and preparation of bid documents and construction support for the design of water pipe replacements along five street segments in the City.
Ed Slintak, PE will serve as the primary contact for this Project. His contact information is as follows:
Ed Slintak, PE | Project Manager
phone (650) 522 2533| [email protected]
We are confident that our team is best suited to deliver this project for the City. Below is a summary of specific reasons why the City should choose CSG as the water main design consultant.
A Proven and Experienced Project Manager & Project Engineer– Ed Slintak, PE, will serve as the Project Manager for this contract. Mr. Slintak brings over 35 years of municipal and civil engineering experience, and a deep understanding of managing and designing subsurface utility improvements throughout San Mateo County. He served as the Project Manager for waterline improvements in the Town of Hillsborough, City of Millbrae, and City of Morgan Hill. Matthew Pi, PE, will serve as the Project Engineer. Matthew brings over 12 years of engineering design experience, with a focus in waterline design. Prior to joining CSG, he served as a project manager for Cal Water, overseeing the design and construction of waterlines throughout San Mateo and Santa Clara County.
The Right Experience and City Knowledge– CSG has performed project management and design services for waterline rehabilitation for public agencies throughout the Bay Area. CSG has provided design and construction management services for several CIP projects for the City in addition to assisting with various C3 and mapping reviews. Our team brings a deep understanding of City processes and procedures, City staff, and City topography to this Project.
CSG will team with Quiet River Land Services to perform surveying work, BAGG Engineers to perform geotechnical services, and Subtronic Corporation for underground utility investigation. CSG has partnered with these firms for previous projects.
CSG acknowledges receipt of Addendum 1 and 2.
We are excited about the opportunity to serve the City of Daly City and would welcome the opportunity to talk with you further. If you have any questions or need additional information, please contact Mr. Slintak at [email protected] or (650) 522-2533.
Sincerely,
Cyrus Kianpour
President, CSG Consultants, Inc.
1 S E C T I O N
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 2 Profile and Project team
For the past 30 years, CSG Consultants (CSG) has provided civil engineering, project management, and construction management to public agencies throughout California. CSG has expansive knowledge providing the design of and management of water main replacement projects. Provided below is our proposed organizational chart for the City’s review. Resumes of key staff are provided in the Appendix, key staff are indicated with an (*). CSG is committing the staff listed to this project and the City of Daly City.
Project Manager
Ed Slintak, PE, Principal Engineer, will serve as the Project Manager and main point of contact for this project. Mr. Slintak brings over 35 years of municipal and civil engineering experience, and a deep understanding of managing and designing subsurface utility improvements throughout San Mateo County. Notable projects Ed has managed include:
• Millbrae – Ahwanhee Drive Water, Sewer, and Complete Street Repair • Morgan Hill – Barrett Avenue Water and Sewer Mains Project • Hillsborough – Water and Sewer Improvements
2 S E C T I O N
Matthew Pi, PE, NASSCO*
Son Hoang, EIT, NASSCO
Allan Simeon, EIT
CIVIL DESIGN
Quiet River Land Services, Inc.
Surveying
BAGG Engineers
Geotechnical
Subtronic Corporation
Underground Utility Investigation
SUBCONSULTANT
Ed Slintak, PE*
PROJECT MANAGER
Hatem Ahmed, PE, PMP*
PRINCIPAL IN CHARGE
Michael Laderman, PE*
QA / QC
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 3 Relevant Experience
Provided below are descriptions of projects that members of the proposed team have completed in recent years.
Ahwahnee Drive Water, Sewer, And Complete Street Repair Project | City Of Millbrae, Ca
Ahwanhee Drive is an approximately 1,600-foot-long street segment located in a hillside residential neighborhood in the City of Millbrae. Due to the aging utility infrastructure and deteriorating roadway pavement, the City initiated a complete street repair project. Utility work as part of the complete street repair project included replacement of the existing sanitary sewer main, reconnection of sewer laterals, installation of new cleanouts and backflows, relocation of the existing water main, and replacement of water services up to the meter where necessary. The project also included rehabilitation of the existing pavement, installation of ADA compliant curb ramps, and spot repairs of concrete curb, gutter, and sidewalk where deficiencies were noted. Finally, the existing streetlights along the corridor were upgraded with new streetlight poles and LED fixtures, new streetlight pull boxes were installed, and a new street light conduit was installed in the roadway. Ed Slintak serves as the Project Manager assisted with Matthew Pi as the Design Engineer and Hatem Ahmed as the Principal in Charge for this Project.
Reference: Bill Giang, Assistant Engineer
621 Magnolia Avenue, Millbrae, CA 94030
(650) 259-2325, [email protected]
Barrett Avenue Water And Sewer Mains Project | City Of Morgan Hill, Ca The Barrett Avenue Water and Sewer Mains Project in the City of Morgan Hill involved upgrading sewer and water facilities. The project area was approximately 4,200 linear feet along Barrett Avenue and the utilities cross under Highway 101 and the Santa Clara Valley Water District’s Madrone Channel. Within this project area, approximately 3,785 LF of 18” replacement sanitary sewer main and 1,940 LF of 16” replacement water main were installed. Trenchless construction methods were designed to install a 30” steel casing for the sewer main and a 24” steel casing for the water main each with a length of 390 LF under the highway and Water District channel. The replacement sewers were installed using pipe bursting, while new water mains were constructed parallel to the existing using traditional cut and cover. Sanitary sewer manholes were modified to conform to the increased pipe size and sewer laterals were reinstated. Water service connections and fire hydrant connections were also reinstated. CSG Consultants prepared the plans, specifications, and estimate for this project, assisted in obtaining permits, and provided construction support. CSG also provided constructability reviews during design. Ed Slintak served as the Project Manager for this Project.
Reference: Lynette Kong, Associate Engineer
17575 Peak Avenue, Morgan Hill, CA 95037
(408) 310-4714, [email protected]
Water And Sewer Improvements | Town Of Hillsborough, Ca CSG, led by Ed Slintak, served as Program Manager for upgrading the Town’s sanitary sewer collection and water system, reporting directly to the Town’s Director of Public Works as well as presented findings, recommendations and status reports to the City Manager and City Council. CSG managed and performed all design work financed by revenue bonds for the Town with a construction value of approximately $15 million.
CSG worked closely with the Town to evaluate and prioritize water facilities most in need of upgrades to be financed by the bond measure. CSG prepared the construction documents for this multi-year program.
Improvements included replacement of two 0.5M gallon water tanks, addition of pump stations to increase fire flow capacity and the replacement of over 7 miles of water mains through the curvilinear hillside streets of Hillsborough. The new mains were primarily 12” cast iron pipes. Meter upgrades and hydrant replacements were also part of the project. CSG also performed Construction Management and inspection functions for the projects.
3 S E C T I O N
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 4 CSG engineers managed video inspection of over 100,000 lineal feet of sewer mains, pipe bursting of over 12,000 linear feet and lining with Cured in Place Pipe (CIPP) of over 35,000 feet of pipe. CSG also designed and managed construction of new mains utilizing trenching methods such as a bypass line (Pinehill-Ralston Sewer main) to eliminate sections of sewer main within an active landslide. The approximately $1 million project utilized traditional trenching methods. Ed Slintak served as Project Manager for these projects assisted by Michael Laderman as the QA/QC reviewer.
Reference: Paul Willis, Director of Public Works
1600 Floribunda Ave, Hillsborough, CA 94010
(650) 375-7444, [email protected]
Utilities Program Management | City Of Morgan Hill, Ca
CSG provided program management, design, and construction management services to the City for their $18 million sewer and water improvement program, as part of the City’s bond measure. In addition to program management services, CSG provided the following tasks
• Work with City in preparing each project scope of
work, budget, and schedule.
• Prepare RFP documents for design services per the
City requirements for each project
• Prepare documents required to obtain Authorization
to Proceed with Construction
• Coordinate with other stakeholders/agencies – Santa
Clara Valley Water District, PG&E, Cha rter, and
Verizon/Frontier
• Oversee projects during the planning, design, and
construction phases
• Prepare contract award package per the City requirements • Attend City Council and public meetings and assisting with material preparation for the meetings • Perform construction management for various utility projects • Program and projects control and program close-out
CSG coordinated the design teams of two separate projects (water line and water tank) to help reduce the overall cost of the projects. Hatem Ahmed served as the Program Manager acting on the City’s behave assisted with Ed Slintak and Michael Laderman for design reviews.
Reference: Lynette Kong, Associate Engineer
17575 Peak Avenue, Morgan Hill, CA 95037
(408) 310-4714, [email protected]
CSG PROPOSAL TO THE CITY OF DALY CITY
SAN DIEGO, SANTA CRUZ, AND GUADALUPE WATER MAIN REPLACEMENT PROJECT 5 Project Approach, Organization, &
Local Presence
Daly City (City) is proposing to implement the San Diego, Santa Cruz, and Guadalupe Water Main Replacement Project (Project) to improve water service, increase water main reliability, reduce water loss and the number of main breaks in the service area. The total length of the project is approximately 1,600 linear feet (LF) and will include both 6” and 8” replacement water main. CSG is highly experienced with design of these types of improvements for
similar projects located in residential streets
utilizing open cut trench method, horizontal
drilling, bore and case and slip-line. CSG is
familiar with the latest American Water Works
Association (AWWA) and Department of
Drinking Water (DDW) standards for water
main installation including Ductile Iron (DI) and
Polyvinyl Chloride (PVC) pipe.
In preparation of this proposal, and to
familiarize ourselves with the Project, CSG has
reviewed the RFP and City Design Standards,
performed a site visit at the project location,
assembled a high-quality team, discussed
internally to determine the best approach, and
developed viable project alternatives.
Santa Cruz Ave and Guadalupe Ave are
residential streets of single-family homes with
approximately 25ft wide roadway width. San Diego Ave is a residential street of single-family homes with an approximate roadway width of 30ft. All streets have gutter, curb and sidewalk on both sides of the corridor with storm drain, sanitary sewer and water main located in the street, except for Guadalupe Ave where storm drain piping is absent. Existing overhead utilities are running along all streets with overhead service connections spanning the entire corridor. Portions of the streets were observed to be recently slurry sealed.
There is an abandoned 30” water main running along San Diego Ave.
CSG recommends the use of open trench method for installation of water main along all three streets and to forgo a pipeline assessment report. Trenchless methods (horizontal directional drilling, pipe bursting, slip-line, bore and case) were evaluated and found to be of no additional benefit in terms of cost savings, improved constructability, or reduced impact to residents and traffic.
Horizontal directional drilling (HDD) and pipe bursting (bursting) were evaluated and found to be disadvantageous for the project. Typically, trenchless methods are used to mitigate potential construction impacts by minimizing excavation area and pavement restoration. For this project, trenchless installation methods will still require additional excavation at each service reconnection and hydrant installation negating potential benefits. Also, due to the limited roadway width and multiple below-ground utilities in the street, HDD and bursting methods pose a risk of colliding with existing utilities or damaging them through vibration.
Vibrations may also damage adjacent resident properties leading to claims.
Slip-lining the existing 30” SFWD main was evaluated and found to be difficult because of the need for extensive penetrations of the main to install service saddles or hydrant connections. Also, the structural integrity of the abandoned main is unknown. Bore and case was evaluated and found to be unnecessary since casings are typically needed for railroad crossings, or areas of heavy truck traffic flow, both of which are not present at the project location. If SFPUC has abandoned all rights to the abandoned pipe, removal of the 30” pipe and placing the new main in its location will be an option, although removal of the pipe will increase construction costs.
4 S E C T I O N