• Pump Station 1090-1 Upgrades, Spring Valley, CA
Pump station upgrade with (3) 60HP pumps. Upgraded electrical utility service, existing emergency generator, motor control center with soft starters, lighting, and general power. Instrumentation and controls system with pressure and flow instruments, pump controls, and SCADA PLC w/telemetry. • Alberhill 1.601/1634 Pump Station, Lake Elsinore, CA
New Pump Station with (4) 150HP pumps and (2) 75HP pumps. New electrical utility service, emergency generator, and motor control center with sorts starters for pumps, lighting, and general power. Instrumentation and controls system with pressure, flow, and treatment instruments, soft starter pump controls, and SCADA PLC w/telemetry.
• Sommers Bend Hydropneumatic Pump Station, Temecula, CA New Pump Station with (2) 20HP pumps and (1) 75HP pumps. New electrical utility service, emergency generator, and motor control center with sorts starters for pumps, lighting, and general power. Instrumentation and controls system with pressure, flow, and treatment instruments, soft starter pump controls, and SCADA PLC w/telemetry.
2734 Loker Avenue West I Suite M I Carlsbad I CA 92010 ( Tel. (619) 962-2356

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

mks
19196
9,00y'll,

QUALIFICATIONS TO PROVIDE

THE CITY OF DOWNEY

ON -CALL CIVIL ENGINEERING SERVICES
35 DISCOVERY, SUITE 240, IRVINE, CA 9261.8
(949) 588-0707
OC 10BER 13, 2023
WWW.RICI<ENGINEERING.COM

October l3'2O23
Matthew Baumgardner, PE EM
Director ofPublic Works/City Engineer ENGINEERING COMPANY City ofDowney
21l1lBrookshire Avenue Civic Center Drive
Downey, CA9O241
Rick Engineering Company (RICK) has assembled a comprehensive team to support the On -Call Civil Engineering Services contract for the City ofDowney (City). Our firm has provided similar services to regional public agencies, including nearby Orange County municipalities, for over 68years. |1isthis history oflocal service within local agencies in Los Angeles and Orange County, that inspires our interest in supporting this on -call contract. Our engineering leadership, City -experienced team, and proven project management practices will allow us to effectively deliver assigned projects aligned with the City's TRACK RECORD OF SUCCESS ON ON -CALL CONTRACTS: Providing on -call consulting services requires a team that understands the anticipated and unanticipated challenges of tasks that may arise from City needs. We recently have assembled full -service teams for the following services Civil Engineering, Traffic Design,LandscapeArchitec1ure, Drainage/SWPPP, Surveying, Water/Waste Water, Geotechical Engineering, and Right -of -Way Acquisition, each with extensive knowledge and demonstrated experience in public works projects. For task orders requiring additional services not provided by our listed team, RICK can add required specialists as needed with the City's approval. Our experience includes successful contracts in Southern California, such asthe Cities ofLake Forest Irvine, Santa Ana, Anaheim, Long Beach, and Manhattan Beach.

RIVEN PROJECT MANAGEMENT APPROACH FOR COST EFFECTIVE DELIVERY: RICK produces high -quality deliverables with meticulous attention to detail. Our4'e|ement approach, described in detail within our provided qualifications proposal, allows us to deliver designs that result in competitive contractor bids and the most efficient use of City resources.

FULL -SERVICE ENGINEERING RESOURCES: RICK has the in-house technical experience, resources and capacity to perform the majority of services expected under this contract. We have a staff ofover 44O regional professionals available to support this contract. For more specialized services, we have included subconsultant partners on our team, with whom we have worked successfully on past contracts.

We have organized our submittal in full compliance with the RFQ and addenda requirementsand wetake noexceptions 1otheCityagneement.P|easecon1acteither]oeHammondormyse|fatkB49\588-8715,jhamnmnond@rickengineer|ng. com, or [email protected], should you require additional information. We look forward to continuing our relationship with the City in support of the City's on -call contract. Thank you for your consideration.

Barry Cowan, PE
Principal |nCharge, Contract Manager
9X_;
Joe Hammond, PE, QSD/P
Project Manager
36 Discovery, Suite 240 Irvine, California 92618 - (949) 588-0707 - wwwrickerigineering,corn

2 TEAM PROCESSES AND RESOURCES 21
a. R|CK's Planning Philosophy, Organizational Structure, and Management Plan b. R|CK'sTinne Dedication
APPENDIX Al
Example: Scope of Work

Our proposal, presented inaccordance with the RRQSection 3,illustrates our team'sspecia|ized experience and technical competence, proposed project approach, key personnel experience and commitment, and local knowledge and experience. This executive summary serves as an overview of our proposal.

Who We Are. RICK isanaward winning, fuU-senvioe, multi -disciplinary planning, design, and engineering firm that has served thousands of public and private sector clients across the West since our founding in 1955. With over440 employees, we offer a full range of services, from initial planning and visioning through concept development, final designs, and implementation strategies.

Although we offer comprehensive services, we operate like a smaller firm, and as a result, we can respond rapidly with more creative solutions for clients, and with more personalized service. Our services include:
* Civil Engineering
* Water Resources Engineeril.,
* Traffic Engineering
* Landscape Architecture
* Urban Design and Plannin,,p
* Surveying & Mapping
The RICK Tem. Barry Cowan, PE will lead our team and serve as Principal -in -Charge overseeing the project and providing corporate commitment. Joe Hammond, PE, QSD/Pwill serve asProject Manager and will be responsible for the day-to-day management of the RICK Team, serving as the direct point -of -contact for the City. He has local experience on similar projects, including previous project work with local agency staff, including Manhattan Beach and Long Beach, and has experience with on -call projects, including those with complex constraints. Supporting him is 11 local Irvine and more than 240 Southern Californa-based, interdisciplinary RICK colleagues. Our diverse services allow us toquickly access information and collaborate in-house,yielding streamlined and expedited results for our clients.

Subconsultant Partners. RICK has engaged with Steven Andrews Engineering, G&nUGeotechnToa|,and NuA0ancaskey members ofour team. The following describes their experience and expertise to assist with this pursuit.

Steven Andrews Engineering k5AE\isadynamic Southern
California consulting engineering firm, providing consulting services for master planning and engineering projects in sms|mssx|mG the water and wastewater fields for over 34years. SAE has provided consulting on civil/water resources master planning, design, and construction engineering for both the public and private sectors. Their services include preparing feasibility and preliminary engineering studies; preparing plans and specifications; providing expert testimony and construction contract administration, and providing observation support during construction.

kA I �� �� GMUGeotechn|ca|has evolved
�� ���������| 0� from asmall geotechnica|firm into
����|�� ������ a multi -disciplined engineering and
L N GoN LE mm& C L 0mCI�C|S n5 geologic consulting firm providing geotechnica[pavement, structural,
and civil engineering services aswell
asconstruction management and other related services
throughout California and the southwestern United States.

GMUhas built areputation asatrusted engineering
and geologic consultant and has worked onsome ofthe
most challenging and recognizable construction projects throughout Southern California. GMUalso provides afull
range of soils and special inspection services as well as soils, rock, and materials testing in its regionally known on -site laboratory. GMU'sdiverse team nfexperienced
professionals collaborate todevelop innovative and cost- effective so|utions1osadsfvourc|ienis'needsandbud8ets
and, along with its ability to provide a wide range of related services, isable tuprovide engineering insight and tools tu solve problems that other similar consulting firms cannot.

Our Approach to On~CalKContracts,
R|CKunderstandsthepurposeandobiecdvesofanon-
caUservicecortrect.Throughoutourcompanv'shistorK
wehave successfully performed ovariety ofTask Order
services for on -call contracts for municipalities, government agencies, and academic institutions throughout California.

VVeunderstand the importance ofon-call contracts,
supplementing anagency's staffing capacity, and helping ensure the agency meets its project processing goals
and standards. This requires the on -call consultant to execute and deliver Task Orders tomeet the agency's
goals, objectives, and schedule deadlines. On -call service contracts require effective coordination of multiple
disciplines, as well as managing multiple Task Orders
simultaneously. Our Task Order work plans are grounded
inour experience recognizing the complexity ofefforts
necessary towork collaboratively with City staff. Together, wework tnunderstand the goals and objectives ofeach
Task Order assignment, gather and assess data relating
10the assignment. VVethen apply our knowledge and
expertise toreview and process planning applications,
prepare adraft plan, text, orordinance, and revise as
necessary togain approval and implementation ofthe
plan, text, orordinance inassimple terms asnecessary.

VVewill utilize our considerable experience with today's best practices and contemporary planning and engineering techniques.

Our On -Call Experience. Our team has amassed
awealth ofpublic agency knowledge and issensitive to
the concerns agencies have regarding funding, critical
project deadlines, and community response. |nour work
NuMarc US, INC. isa
NuMarc US, Inc.` corporation duly organized
ofCalifornia in2O17.NuK4arc
provides diverse real estate
services for its client's inthe energy, transportation and commercial real estate sectors. Their approach is to deliver consistent and reliable results totheir clients while building strong working relationships with all stakeholders, ensuring project success both inthe short and long-term. Below are afew ofthe services typically provided totheir clients:
* Right- and Real Estate Property Acquisition
8&Negotiation Services
w Residential and Business Relocation Services
* Project Management & Quality Control
* Property Management Support Services
* Title Review/Curative & Escrow Coordination
* Real Estate Consulting
asconsulting planners and engineers for public agencies, weview ourselves asanextension ofthe municipality's
staff. VVehave gained the knowledge tosuccessfully act
on a moment's notice to address citizen concerns, provide guidance and expertise, and facilitate design services
to meet critical funding allocation deadlines. We are
experienced in, and understand, the process ofpreparing staff reports required for Governing board reviews and
approval processing. Se|ecton'ca|| contracts include:
* City of Manhattan Beach, Aviation Boulevard
Missing Sidewalk Project
* City of Long Beach, As -Needed Street Design
Services
* Orange County, Public Works On -Call Engineering
* City of Lake Forest, Street and Traffic Design
* City of Lake Forest, El Toro Road at Portola/
Santa Margarita Parkway
* City of Lake Forest, Bake Parkway at Trabuco Road/
Irvine Boulevard
* City of Santa Ana, Thornton Park Neighborhood
Water Main Replacement
* City of Anaheim, On -Call Support & Plan Checking
Services
* City of Santa Ana, On -Call Civil Engineering Services Qualifications Summary. Our Team iswell qualified
toprovide services for the City ofDowney. With our Project Manager located in our Irvine office, we are just a short drive tuCity Hall and project sites. We pride ourselves on responsiveness for which our client references can attest.

A well -organized team, with clear division of responsibilities, is essential to the successful delivery of this City contract. The organization chart below identifies key staff for each discipline required for the assigned tasks we anticipate, as well as the scope items outlined inthe RF[L
Steven Andrews, PE Roger Schlierkarri PE, M.SC Jeffery Keppert - Water/Wastewater Facilities Geotechnical Engineering Right -of -Way Acquisition Services MPercentage ofindividua|'stime devoted tothis project.

Indicates Key Personnel.

Team members with deep experience and knowledge managing multi -disciplined projects and task orders.

The following section includes resumes of key personnel and brief summaries outlining roles and qualifications for the RICK personnel.

Joe will serve asProject Manager. Hehas over 3Syears ofexperience oncivil on -call contracts with broad knowledge ofstreet improvement projects. Most ofJue'scareer has involved work for Orange County municipalities, including the City of Santa Ana, Newport Beach, Anaheim, Lake Forest, Garden Grove, Westminster, Cypress, and the County of Orange. He has extensive knowledge of all elements of civil assignments and established relationships with local agencies, utilities, and stakeholders. Joe has completed numerous projects, including roadway and street improvements, ADA enhancements, complete streets, traffic, water, storm water, utility planning, and park facilities.

Relevant Project Experience
* On -call Roadway and Bikeway Engineering Seru|cea,K3C Public Works, CA: Joe iscurrently the project manager for two projects with the County ofOrange. One project isanUpdate to the County's Highway Design Manual and the other is a drainage study and conceptual drainage improvements for the Panorama Heights neighborhood. " Development Services On -Call Plan Checking Services, City ofAnaheim, CA: Through an on -call contract, Joe led the team in providing plan -check services catered toward stormwater documentation and private land development projects within the City. All work was checked for conformance with the City of Anaheim Guidelines and additional ordinances. ° Thornton Park Neighborhood Water Main Replacement, City mfSanta Ana, CA: Joe served as Project Manager for the preparation of construction documents for the replacement of approx. 7,5OOfeet of8-inch water main within nine residential streets in an established neighborhood.

He also directed base map preparation, engineering design, specifications and construction cost estimates, as well as day-to-day communication with the City's project manager. * Multiple Street Intersection Improvement Projects, City ofLake Forest, CA: Civil engineer for several street improvement projects including widening of Bake Parkway at Irvine Boulevard, intersection improvements at E| Toro Rnad/Porto|o Parkway, widening Jeronimo at Lake Forest, intersection improvements atBake Parkvvay/Tz|edoVVay, and intersection improvements at LosA|isos Boulevard and Rockfie|d Boulevard. = Ocean Boulevard and Poppy Avenue Street Improvement Project, City of Newport Beach, CA: Joe served as Project Manager for this street rehabilitation and landscape enhancement project which entailed pavement reconstruction of 1500 feet of Ocean Boulevard and a complete street reconstruction of 1350 feet of Poppy Avenue. The sidewalk and landscaping replacement in the residential parkways of Poppy Avenue was coordinated with the City staff and residents. RICK provided all civil engineering, landscape architecture, and land surveying services for the project.

Barry will serve as Principal -in -Charge and QA/QC Manager on this contract. He has over 37 years of local experience overseeing similar on -call contracts and managing QA/QC responsibilities on individual task orders. His extensive experience includes general civil, traffic and transportation, water quality, and survey and mapping projects. Barry is well - versed in local agency standards and was a leader in developing RICK's quality manual. As a senior member of RICK, Barry has the authority to draw upon internal resources to ensure the team's progress continues effectively and efficiently. If project requirements necessitate staff additions or adjustments, he will review proposed staff member qualifications and submit these to the City for their review and written approval.

Barry is familiar with local agency standards, including those of the City, relating to grading and drainage design, freeway/highway/street design, and cost estimates from previous preliminary engineering and construction document preparation experience, Relevant Project Experience
• Aviation Boulevard Missing Sidewalk Project, Manhattan each, CA • Victoria Street Pavement Rehabilitation Project, Long each, CA Trabuco Road and Monroe Intersection Improvements, Irvine, CA IBC Sidewalk Improvements, Irvine, CA
University of California, Irvine, Life and Safety Improvements, Irvine, CA Bake Parkway and Trabuco Intersection Improvements, Lake Forest, CA 1-5 Signage Improvements, Lake Forest, CA
El Toro Rd. and Portola Pkwy. Intersection Improvements, Lake Forest, CA Antonio Gateway Improvement Project, Rancho Santa Margarita, CA Rancho Santa Margarita Monument Gateway Improvements, Rancho Santa Margarita, CA Santa Margarita Parkway and Empresa Median Landscape Improvements, Rancho Santa Margarita, CA
Ocean Blvd. and Poppy Ave. Street Rehabilitation, Newport Beach, CA Cerritos Avenue Bike Corridor Improvement Project, Cypress, CA Harbor Boulevard Roadway Improvements, Garden Grove, CA Madison Avenue Street Improvements, Murrieta, CA
Thornton Water Main Replacement, Santa Ana, CA
Foothill Covina Transit Center, Foothill Transit Authority, Covina, CA Sierra Avenue Widening, Fontana, CA
Twintree or Drain and Sewer Improvement Plans, Garden Grove, CA Moody Street Median Enhancement, Cypress, CA
Various Intersection Improvements, Cypress, CA
Westminster Boulevard Median Enhancement, Westminster, CA Residential Street Improvements, Westminster, CA
W"

a =,
Brian is an Associate Principal at RICK, managing a team of traffic engineers. Brian and his team provide engineering services, including preparing and reviewing traffic impact studies, traffic signal plans, signing and striping plans, traffic control plans, optimized network timing plans, and accident analysis. Brian is well -versed in municipal traffic engineering and currently provides services to the City of Murrieta as a Consultant Traffic Engineer.

Relevant Project Experience
* El Toro Road and Portola Parkway Intersection Improvements, City of Lake Forest, CA
* Rancho Parkway and Sports Park Traffic Signal, it of Lake Forest, CA * Bake Parkway and Toledo Preliminary Intersection Design and Traffic Analysis, City of Lake Forest, CA
* Jeronimo and Lake Forest Drive Intersection Improvements, City of Lake Forest, CA
* Bake Parkway and Irvine Boulevard Intersection Improvements, City of Lake Forest, CA
* Trabuco Road and Monroe Intersection Improvements, City of Irvine, CA As a Principal Project Engineer with RICK, Dan will lead a staff of engineering designers and drafters in preparing preliminary and final construction documents for the City.

He specializes in roadways, highways, residential developments and commercial site improvements.

Relevant Project Experience
* Aviation Boulevard Missing Sidewalk Project, Manhattan Beach, CA * Victoria Street Pavement Rehabilitation Project, Long each, CA * es ark Skatepark Expansion, Ventura, CA
* Trabuco Road and Monroe Intersection Improvements, Irvine, CA * Various Intersection Improvements, Cypress, CA
* SR-74 at Grand Avenue Roadway Widenings, Lake Elsinore, CA * San Juan Capistrano Skate Park PS&E, San Juan Capistrano, CA * San Juan Capistrano Multi -Use Trail, San Juan Capistrano, CA * City of Cypress On -Call Engineering Services, Cypress, CA Three Intersection Improvements, Traffic Through -Put, Cypress, CA SR 76 at Melrose Drive Intersection Improvements, Oceanside, CA Multiple (4 each) Intersection Improvement Projects, Lake Forest, CA F__

Scott is a Project Engineer for transportation, multi -family and detached residential subdivisions, roadway improvements, and water quality projects. His experience includes designing and preparing of preliminary and final grading and improvement plans, and PS&E.

Project tasks include grading, earthwork, utilities, streets, drainage facilities and quantities and cost estimates. Scott has served as QA/QC manager as well as design and plan preparation manager for multiple projects throughout the Southern California region. He is competent with current with design standards relating to grading, drainage design, water quality, and street, highway, and interchange designs.

Relevant Project Experience
* EIR and Preliminary Grading and Alignments for Madison Avenue Realignment, City of Murrieta, CA: Key Components: Roadway Design, Traffic Analysis, Hydrology Analysis, Water Quality Analysis, Cost Estimates, Environmental Documents (CEQA & MSHCP), Right-of-way acquisition.
* Antonio Gateway Improvement Project, Rancho Santa Margarita, CA * Residential Street Rehabilitation, Westminster, CA
* Moody Street Median Enhancement, Cypress, CA
* Grading and Improvement is for Lighthouse I & 11 Detached Condos, KB Home, Stanton, CA
* Grading and Improvement Plans for East Lincoln Town Homes, KB Home, Anaheim, CA Jayne is a Principal and co -leads RICK's Water Resources Division. Jayne manages staff and oversees the preparation of hydrologic and hydraulic analyses and the design of Best Management Practices (BMPs) to meet water quality objectives. She is well -versed in designing Low Impact Development (LID) and Hydromodification Management facilities. She is an expert in storm water regulations and prepares Notices of Intent (NOls) and Storm Water Pollution Prevention Plans (SWPPPs). Jayne was the Project Manager for the consultant team preparing the Model BMP Design Manual pursuant to the 2013 MS4 Permit.

Relevant Project Experience
* On -Call Plan Checking Services, Development Services, Anaheim, CA * On -Call for Drain Design Services, Cypress, CA
* Menifee Master Darinage Plan, Menifee, CA
Caltrans District 7 Litter Management Pilot Study, Los Angeles, CA or Water Quality Improvements for Shady Maples/Tar Farms Equestrian Center, San Juan Capistrano, CA
As -Needed Civil Engineering & Consulting Services for Municipal for Water Program, City of San Diego, San Diego, CA
As -Needed Storm Water Management Services, San Diego Unified Port District, San Diego, CA
• Storm Water Pollution Prevention Plan (SWPPP) Oversight of SDUSD's Active Construction Projects, San Diego Unified School District, San Diego, CA • Annual SWPPP Training for County Staff, County of San Diego, CA Rf"

Anthony CottsbaPrincipal Water Resources Project Manager/Engineer atRICK. Anthony has 19 years of experience in civil and water resources engineering consulting and construction services, including extensive experience on projects for public agencies as well as the private sector
He has served as the project manager on several land development, commercial, and residential projects. His expertise is wide ranging and includes hydrologic modeling, hydraulic modeling, channel improvements and bank protection, flood plain studies, flood map processing, storm drain, permanent Best Management Practices (BMPs), environmental permitting, grading, erosion and sediment control, water and sewer design, project specifications, and project cost estimates. Anthony has prepared and processed projects through various resource agencies including SWQCB, USACE, NRCS, CALTRANS, and FEMA.

Relevant Project Experience
= On -Call Plan Checking Services, Development Services, Anaheim, CA * Drainage Study for Panorama Heights, Orange County, [A " StormmwuaterQuality Improvements for Waste Management Facilities, Orange and Irvine, CA
* Villages at Laguna H|l|sStormmwater Hydrology/Hydraulics Design and VVQK8P, Laguna Hills, CA
= Arroyo StormnxxaterHydnmlogx/Hydrau|1cs Design and VVQK8P, Stanton, CA is Buena Park Downtown Redevelopment, Buena Par!, CA
Patricia is a Principal at RICK and has more than 35 years of experience providing landscape architectural services toSouthern California. 4sa registered landscape architect in California, a certified planner, and a LEED AP, she has planned and designed numerous public projects throughout San Diego and the Los Angeles basin. Her projects have received awards from organizations including [K4AA,ASCE,APVVA,UL|,ARA,A3LA,and NAVFA[Throughout her career, Patricia has been an active practitioner ofsustainable design, responsible for spearheading projects through LEED certification. Patricia is the Landscape Architect of Record fora dozen projects atthe San Diego International Airport; she has shifted the Airport's philosophy to embrace a regional, drought -tolerant landscape that cost significantly less for the Airport to maintain, plus has a longer |ifecyde.

Relevant Project Experience
* Corona Del Mar State Beach, Newport Beach, CA
" Orange County Great Park Master Plan Modification 2, Irvine, CA = Parking Structure and Surge Building, University of California, Irvine, CA * Terminal Redevelopment, Terminal 2Expansion, Facilities Management Campus, San Diego County Regional Airport Authority
= Antonio Gateway Improvement Project, Rancho Santa Margarita, CA

Stephanie is a Landscape Designer in the RICK Landscape Architecture Division. Prior to joining RICK full-time, Stephanie interned in the RICK Landscape Architecture Division where she gained experience on streetscapes, commercial, and institutional landscape design projects.

Stephanie has been involved in a broad range of public works projects and commercial, educational, industrial and residential projects for private clients.

Relevant Project Experience
• Antonio Gateway Improvements Project, Rancho Santa Margarita, CA • Veteran's Village, Cathedral City, CA
" Sierra Street Widening, Fontana, CA
" California Baptist University (CB0) Study Place, Riverside, CA • Olen Properties, Winchester, CA
� CVS,Various Locations, CA
" Trojan Storage, San Jose, CA
Geff is an Associate Principal at RICK. A third -generation surveyor with more than 37 years of experience providing services for public and private projects. His experience includes residential subdivisions, commercial property developments, land title surveys, topographic surveys CPS surveys, site plans, aerial mapping control, legal description preparation, monument preservation, settlement monitoring, boundaries, utility systems mapping, and right-of-way and easement determinations.

He has also managed construction staking for roadways, utilities, highways, bridges, parks, boundary and topographic surveys, and other infrastructure improvements. Geff is also responsible for scheduling and coordinating field activities for survey crews.

Relevant Project Experience
° Bake Parkway and Irvine Q|wd/TrabummRoad Intersection Improvement Field Surveys, Lake Forest, CA
* Ocean Boulevard and Poppy Avenue Street Improvement Project, Newport Beach, CA " Villages atLaguna Hills, KHer|one Geier Partners, Laguna Hills, CA * El Toro Road andPnnto|a Parkway Intersection Improvements, Lake Forest, CA

&1;��Steven
brings 471�years ofrexpefienre in master planning, design, and construction of groundwater wells, water treatment, water pipelines, and water storage reservoirs. He has also Years of Experience
prepared master water supply plans, wastewater treatment plants, wastewater rec ama on plants, wastewater lift stations, force mains, gravity sewers, and water reuse systems for public

UCATION
and private developments.

Environmental Engineering,
N Marygold Mutual Water Company Well No. 6, City of Bloomington, CA nsylvania State University
E Design and Preparation of Construction Plans, City of Chino, CA

GISTRATION
z Construction Management and Engineering Services, Walnut Park Mutual Water Co., CA CA No. 31259
0 Master Plan Studies, Design and Plan Checking, and General District Engineering Support, Tejon-Castac Water District, CA
f/At 0.2
Irvine Ranch Water District, Irvine Spectrum Apartment Complex, Irvine, CA E Irvine Ranch Water District, PA 1 & 2 EIR Domestic Water and Wastewater System Study, Irvine, CA
Roger Schlierkamp spearheads GMU's comprehensive range of pavement engineering services, including pavernenteva|uatiuns/designs, PS6LE development, construction management, observation -and -testing, mix design development, and pavement management planning. His full -circle knowledge allows him todevelop innovative, practical, and cost-effective solutions for the most intricate and real -world pavement challenges.

He shares his experience and knowledge in both workshop and classroom settings, having previously served as an instructor for "Construction Materials and Testing" at Santiago Canyon College. Additionally, his active role in the Greenbook Committee underscores his influence in shaping pavement construction specifications embraced by numerous agencies and projects across Southern California.
* Camino Capistrano, City of San Juan Capistrano, CA
* Hamilton Ave.,Heil Ave.,and Boise Ave. Pavement Evaluation Projects, City mfHuntington Beach, CA
* Irvine Center Dc,Trabuco Rd,Irvine B|xd.,Walnut /ve.,MacArthur Blvd, and Sand Canyon Ave. Pavement Evaluation Projects, City ofIrvine, CA
Jeff Keppert is the President of NuMarc and leads the company's acquisition efforts. With over 25 years of real estate experience, Jeff has acquired a highly diverse and unique skill set that includes appraisal, commercial brokerage, and real estate consulting for use in the acquisition, disposition, valuation, due diligence, permitting, development and management of real estate in several different industries across the Central and Western U.S.Jeff has extensive transactional experience, in both the public and private sector, and has negotiated and structured complex agreements and easements for the acquisition of various property types to secure property rights for his client's projects. Jeff's success, and the success of the projects heworks on, are due to his interdisciplinary approach tosolving problems, and his ability to establish and maintain stakeholder relationships through project closing.

The following section includes resumes of key personnel and brief summaries outlining roles and qualifications for the RICK personnel.

As part of RICK's as -needed civil
engineering contract with the
City, RICK prepared construction
documents for the Thornton
Park Neighborhood Water Main
Replacement project.
2E10 24026062602 2Sffi Z52
r. i
111J 212 o 2426
2-
The project included the replacement
of existing 8" water mains in nine >s--� -
zooI'll
s2az1
2=os 25as Ao, 2 2s
streets in this well -established Santa 2122 212G 2118 2411 1410 °� Ana neighborhood. The total length p° z
of water main replacement was 7,500.
av
feet. The plans and specifications
were prepared such that the existing
water line was live until the new water line was in place and operational. Once the new water line was operational the water laterals were connected to the new 8" water line.

The project included the preparation of a base map based on as built plans, water meter service records, City GIS, and site visit surveys. Work included a records search through City of Santa Ana, County of Orange, and dry utility purveyors. The records research was tracked by keeping a log documenting entity, contact information, date and topic of correspondence, date document was received or outcome.
"

The RICK Team provides On -Call support services to assist the City of Anaheim Public Works Department with plan check reviews ofprivate development projects.

The City requests plan checking services for Storm Water Quality Management Plans, Hydrology Studies and Gentechnico|reviews, aswell asgrading and improvement plans, for both entitlement and construction document phases. Water Quality Management Plans are checked for conformance with the City of Anaheim guidelines and compliance with the latest requirements.

Plan checks are assigned, tracked and performed through the City's electronic portal.

As part of RICK's on -call contract for Road and Bikeway Engineering Services with the Orange County Public Works, RICK is providing Engineering Services for two current projects:

Orange County Highway Design Manual Update
For this project, RICK is soliciting input from various Orange County Public Works department staff members and other interested parties for potential updates to the current Orange County Highway Design Manual. Based on this input, and RICK's own recommendations, a comprehensive list of proposed updates is being compiled. Upon final review and acceptance by the County, the Orange County Highway Design Manual Update will bereleased tothe public.

Panoramic Heights Drainage Study
Orange County Public Works is responsible for maintaining the roads and drainage system in this older affluent neighborhood in an unincorporated area of the County. As part of the project, RICK is analyzing the existing hydrologic condition, identifying high maintenance and hazardous areas of the neighborhood, and providing recommendations to alleviate the areas of concern.

RICK is providing preliminary studies for three intersection improvement projects for the City of Lake Forest. Improvements include the addition of def cto right turn at]eronimo/ Lake Forest Drive, roadway widening to accommodate dual left turn lanes at eastbound Bake Parkway to northbound Toledo, dual left turn lanes at northbound Toledo to westbound Bake Parkway, and roadway widening to accommodate a right turn only lane on westbound Los Alisos to northbound Rockfield; roadway widening to accommodate dual left turn lanes on El Toro Road to southbound Rancho Santa Margarita Pkwy and northbound Portola plus a right turn lane to northbound Portola, and widening of Bake Parkway to accommodate dual left turn lanes tonorthbound Irvine Boulevard.

Key Components: Preliminary Engineering Alternative Analysis, Field Topographic & R/W Surveys, ROW Mapping, Landscape/Irrigation, WQMP, and Temporary Construction Estimate Mapping. ROW acquisition, coordination with SCE, Orange County, and the City of Irvine.

There are many influences that affect the cost ufdesign and construction for any project. Timely and well thought-out design decisions, based onthorough analyses, result inthe most successful projects. This iodone best byintegrating senior management inthe design process and leveraging
that knowledge. Also, clear and concise construction plan sets that are easy to read minimizes contractor RF|�.This ineffect minimizes contractor change orders, helps tu
maintain schedules and results in more accurate budgeting.

Our plan set formatting follows aset ofcompany-wide
standards; however these standards gobeyond the details offile management. VVeendeavor toprepare aplan that is
easy to read by varying scales when necessary; highlighting key information that may otherwise get lost inthe plan set byadding a "third dimension by varying line weights, styles, fonts, patterns, etc.

Provided inthe matrix (be|ow)isour change order data
for are the five (5)most recent public works projects.

Which summarizes the original estimates ofthe project
costs, bid award amount, final construction cost amount (when known),and abrief explanation ofthe deviations
and change orders (when knnwn).VVebelieve that these
projects display our extensive experience with both project design and construction management, asevidenced by
accurate cost estimates and limited construction change orders.

Inclusion ofArbohstServices, additional conceptual design and exhibits based on community input, addition of the preparation of construction documents (p5&E), and preparation of scale exhibit for each adjacent property owner.

Project Management Approach
The RICK Team's project management and delivery system provides regular communication and quick responses from the Project Manager This communication results in tighter control of the project budget and schedule, and facilitates communication with our client and project stakeholders. Our process enables ustofully achieve project objectives, satisfy client requirements and fulfill client expectations. Key elements of our project delivery process are outlined below. * Our detailed workp!an,
created bythe
Project Manager,
Joe Hammond, PE,
QSD/pwill consist
of individual project
tasks and other data
sufficient to outline
the scope ofwork and
plan for assignment
completion.
e The workp|anincludes:
� Detailed scope uf
work
� List of deliverables
= Project schedule
� Milestone dates
m Task budget
* The Project Manager
will maintain the
detailed project
schedule through the
life ofthe project.
* Our Project Manager
will be the primary
contact with all team
members.
* The Project Manager
will:
m Chair scheduled
meetings
* Project
Communications will
include preparing and
distributing:
* Meeting agendas
= Meeting minutes
m Technical
memoranda
= Status reports and
updates
� Confirmation of
verbal requests
Subconsultant Management
RICK Engineering assumes acentral role inmanaging and
overseeing our subcontractors partners for on -call projects.

VVewill assure that subcontractor partners meet the
standards outlined toperform the professional services, have sufficient skill and expertise todeliver, uphold the necessary licenses/certifications required, and maintain the insurance requirements throughout the duration of
the on -call service contract. Once our team is assigned an on -call contract, RICK will ensure the team is set up to meet project timelines, quality standards, and safety regulations. = Our Team iscommitted
todelivering projects
that are successful
technically and meet
budget expectations.
m The Project Manager
will continuously
monitor the activities
ofthe project team,
tracking actual progress
versus budgeted costs.

When deviations occur,
the Project Manager
will take immediate
corrective action.
w Tofacilitate this effort,
RICK uses De|tek
Advantage to track
expenditures, including
both labor and direct
costs, onaweekly and
long-term basis.

G6
� RICK maintains a robust
Quality Assurance and
Quality Control Program
based on proven
practices and years of
experience.
m Key quality controls
include:
m Our Project Manager
will distribute the
QA/QCworkp|ankz
all Team Members
= The Project Manager
will check all
deliverables
= [A/QCmi|estones
will beincorporated
into the final project
schedule
Effective communication iskey, asRICK must maintain
an efficient flow of accurate information, and promptly address any issues that may arise. RICK will also oversee and support the project documentation, change orders,
and billing to maintain transparency and accountability.

In summary, working onbehalf and alongside the
City ofDowney, RICK acts asthe linchpin of project
management, orchestrating the harmonious collaboration
ofsubcontractors 10achieve the successful execution ofthe various on -call civil engineering services.

Management Systems, Tools, Equipment, and Software
RICK maintains ahybrid cloud network, managed onsite toprovide efficient connectivity between 11regional offices and 440 professional staff members. Our network includes over 250 CAD workstations with Bentley M icroStation/I n Roads software and AutodeskAutuCAD/Civi|3Dfor design and drafting. Specialized modeling workstations are built tosupport advanced engineering simulations for traffic and for 2D hydrology and hydraulics analysis. Custom workstations are also provided for UAV/UAS photogrammetry processing and 3D modeling from 3D laser scanning. All systems are backed by a virtual server environment and disk array.

RICK recently completed acomprehensive Drive
Modernization Program, linking all offices with project files, synchronized in real time. This system enables all staff members toeasily share files and work products using
our 'C:\R|CKy common drive, implementing the concept
of"everything,everywhere, all the time" throughout our
offices.

Managers and Team Leaders are able toassign the ideal
resources, including subject matter experts, toeach project regardless oftheir geographic location nrthe need and
associated risk oftransferring files.

Over 400 computer systems are used bvour employees
on a daily basis. Our business Enterprise -Class applications include: De|tekVision accounting system, MSExchange,
Mai|Mana8er,Hyland OnBasedocument management
system, Bamboo HR,MSSQL Server, K4SS[ZIVIsoftware
deployment, SymantecVault email archive, VEEAMbackup
systems, Sophosendpoint protection, 3[Xphone system,
and PEER GF5for replication and file locking. Disaster
recovery isachieved through data and server replication. |naddition remote connectivity isachieved via multi -factor backed MS Remote Desktop Services (RDS), iO£device
deployments, and implementation ofMicrosoft Teams for
team and project collaboration, screen sharing, and audio and video conferencing.

Over1O0 software packages are used todeliver our Best in Industry services including, but not limited to: Adobe Suite, Office365,Microsoft Teams, K4SProject, B|uebeam,LandFx, Sketchup, Rhino, Vehicle Tracking, AutoTurn, Vissim,
Infrastructure Modeler, BenMey5iteOps, Leica Cyclone,
Revit,Navisvvorks,SDStudio, P[SVVMM,6eoHecRAS,
VVSPG,HecRAS,E5R|'s:ArcMAP,ArcG|3Server, ArcG|SPro,
ArcG|S Porta|; MS Studio, Python, Trimble Business Center, Carlson Survey, SurveyPro.In-house developed programs
include: sewer lateral calculator, legal description writer, cut sheet reporter, P[SVVKXM'G|Sbridging utility, job
information sheet collector, and GeoRick'our in-house
geographic -based project index.
0HCK'son-premise system is bolstered by the RICK Cloud, our cloud computing solution built inAmazon Web
Services(AVVS). |naddition, weutilize awell architected network environment, leveraged tooffer highly secure,
self -recoverable and scalable SaaSsolutions toboth our clients and in-house departments. The RICK Cloud allows for project management, G|Sweb application and map
services, file sharing and collaboration services regardless ofgeographic location and project requirements. Our
Reality Portal for virtual site visits, with 360°photography and 3Dweb navigation, isakey product. |naddition, our
As -Built Portal for interactive access 10facility plans, our Planning Portal that enables public engagement, and our RICK DIVIS(document management system) combine
each ofour offerings with visual search tools, similar
to tools used to browse movies on common streaming
services. RICK offers project -based web site design and web hosting, together with common file sharing tools,
connecting project team members, project stakeholders,
and community members, asneeded.

A training suite mf 10workstations isavailable for in-house and vendor -based training sessions, co -located with a 75'peoVnstudio available for large in -person meetings.

In-house digital reproduction facilities include: wide - format document scanners, high speed wide format
Pagevvideplotters, black/white and color production
dncumentcopier/printeo; 6O,0OOsheet/day duty cycle
high speed document scanners, mobile G|Smapping
devices, 3DLaser Scanners, survey total stations, GPSwith cellular RTKnetwork solutions and digital levels.

Each project that arises from public agency on -call contracts or the general public agency RFP process vary greatly depending on many variables. With this in mind, it is extremely difficult to prepare a "menu" style fee sheet for each project type. Based on our knowledge gained through performing work on public agency projects through our nearly 70 years of corporate experience we have found that it is best to meet with the client, discuss the goals and intricacies of the proposed project, the known and anticipated stakeholders, and then collectively determine the project scope of work and its associated professional services fee.

Projects may include conceptual design alternatives with orwithout aproject report, orbeconstruction documents
(PS&E) only, or combination of both. Acoup|e examples
ofproject variabilities for similar project types are explained as follows:

Street Improvements and Intersection widening: These
types ofprojects can beassimple asadding adefacto
right turn lane toanexisting intersection that requires resLripin8ofasingle leg ofthe intersection with atraffic signal modification for the addition ofthe defactoright-turn lane with bicycle detection. On the other extreme it can involve the addition ofleft-turn lanes onone ormultiple legs ofthe intersection requiring additional orwidened
receiving lanes. This type ofIntersection widening can
include additional services such asgeotechnica|analysis/ engineering, environmental documentation services,
dry utility design/coordination, right-uf-vvayanalysis and acquisition services, along with surveying, storm water quality, landscape architecture, transportation and traffic engineering services.

Water, sewer, and storm water infrastructure
improvements: These types ofprojects can be as simple as aneighborhood water main replacement where the work
tubedone can beshown inplan view only, without profiles.

Or the work can be a storm drain system improvement
project that requires the construction ofnew storm drain pipe through anexisting business nrresidential area that impacts the existing water, sewer and their laterals serving the adjacent projects. This type of project could require the design for the replacement ofthe three wet utility
facilities inthe area, nracombination. Other items that could be needed aregeoterhnica| services, environmental documentation, field surveying, dry utility design/
coordination, utility locating, drainage analysis, storm water quality, right-of-wayservices for temporary construction easements, and traffic control design. These two extreme project types would vary significantly on a per sheet cost, unit cost, and sliding cost fee menu.

The included hourly rates are good for the three-year
period per RF[}No. 23'OO2.The included fee for project
types described inthe RF[lare approximations only ofwhat our services for asimilar project type has cost our client for our project team professional services mnpast similar Approximate Project Type Fees
Fee based onconstruction cost (PS&E):This isinthe range of 11%tn 15%. Variables include accuracy nfconstruction cost estimate, project complexity, agencies involved,
riQht-nf-vvayacquisition needs, and level ofdetail inthe conceptual design.
11'reliminary Design:
h rasp
PS&E: F�8 000 to $10,000ISheet
Preliminary Design: $30,000
Preliminary Design: $5,000 to $25,000

I, �1 III TM.

ENGINEERING COMPANY
HourlyCalifornia Officl
Principal Consultant (Special Projects) .............................$ 315.00
Principal.............................................................................. 304.00
Associate Principal.............................................................. 283.00
Associate/Manager............................................................. 262.00
Expert Witness.....................................................................472.00 Court Appearance per half day or part ...............................1,890.00 Senior Project Manager/Engineering Manager ................. $ 257.00
Principal Project Engineer/Manager.................................... 241.00
Associate Project Engineer/Manager................................... 215.00
Assistant Project Engineer/Manager.................................... 199.00
Principal Engineering Designer ........................................... 178.00
Associate Engineering Designer .......................................... 157.00
Assistant Engineering Designer .......................................... 142.00
Principal Engineering Drafter ............................................. 136.00
Associate Engineering Drafter ............................................ 126.00
Assistant Engineering Drafter ............................................ 115.00
Senior Transportation/Traffic Engineer .............................$ 252.00
Principal Transportation/Traffic Engineer ........................... 241.00
Associate Transportation/Traffic Engineer .......................... 215.00
Assistant Transportation/Traffic Engineer ........................... 199.00
Principal Transportation/Traffic Designer ........................... 178.00
Associate Transportation/Traffic Designer .......................... 157.00
Assistant Transportation/Traffic Designer .......................... 142.00
Principal Planner II............................................................$ 226.00
Principal Planner I............................................................... 210.00
Senior Planner II...................................................................194.00 Senior Planner I....................................................................178.00 Associate Planner................................................................ 157.00
Assistant Planner................................................................. 136.00
Planning Technician............................................................ 115.00
Principal Project Landscape Architect/Manager .............. $ 215.00
Associate Project Landscape Architect/Manager .............. 194.00
Assistant Project Landscape Architect/Manager ............... 173.00
Principal Landscape/Urban Designer ................................. 147.00
Associate Landscape/Urban Designer ............................... 136.00
Assistant Landscape/Urban Designer ................................ 121.00
Director of Environmental Planning Services .................. $ 257.00
Principal Environmental Project Manager .......................... 210.00
Associate Environmental Project Manager ........................ 194.00
Assistant Environmental Project Manager ........................ 173.00
Principal Environmental Specialist .................................... 152.00
Associate Environmental Specialist .................................. 142.00
Assistant Environmental Specialist ..................................... 126.00
Environmental Technician .................................................. 115.00
Principal Water Resources Engineer/Manager ................ $ 247.00 Principal Water Resources Designer .................................. 178.00 Associate Water Resources Designer ................................. 157.00 Assistant Water Resources Designer ................................. 142.00 GIS Manager.................................................................... $ 210.00
GIS Programmer................................................................ 178.00
Principal GIS Project Manager .......................................... 199.00
Associate GIS Project Manager .......................................... 184.00
Assistant GIS Project Manager. ............ ............ ............ 168.00
Principal GIS Analyst........................................................ 157.00
Associate GIS Analyst....................................................... 147.00
Assistant GIS Analyst........................................................ 131.00
Principal Graphics Designer ............................................... 142.00
Associate Graphics Designer. ............................................. 131.00
Assistant Graphics Designer ............................................... 121.00
CAD Manager.................................................................... 189.00
Field Supervisor................................................................ $ 231.00 One -person Survey Party ................................................... 189.00 One -person Survey Party with Robotics ............................ 241.00 Two -person Survey Party ................................................... 294.00 Three -person Survey Party ................................................ 399.00 3D Laser Scanning Crew (One -Person) ............................ $ 252.00 3D Laser Scanning Crew (Two Person) ............................. 304.00 Principal 3D Laser Scanning Project Manager ................. $ 210.00
Associate 3D Laser Scanning Project Manager .................. 184.00
Assistant 3D Laser Scanning Project Manager ................... 173.00
Principal 3D Laser Scanning Specialist .............................. 152.00
Associate 3D Laser Scanning Specialist ............................. 142.00
Assistant 3D Laser Scanning Specialist .............................. 131.00
Principal 3D Laser Scanning Technician ............................. 121.00
Associate 3D Laser Scanning Technician ........................... 110.00
Assistant 3D Laser Scanning Technician ............................ 100.00
Photogrammetry Supervisor ............................................. $ 194.00 Principal Photogrammetrist............................................... 168.00 Associate Photogrammetrist............................................... 136.00 Assistant Photogrammetrist................................................ 126.00 Principal Survey Analyst .................................................. $ 205.00 Associate Survey Analyst ................................................... 168.00 Assistant Survey Analyst .................................................... 136.00 Associate Project Administrator ....................................... $ 105.00 Assistant Project Administrator ............................................ 84.00 Administrative Assistant/Manager........................................ 89.00 Field personnel rates subject to change for prevailing wage requirements.

Shown rates are subject to negotiation on June 30, 2025.

Unless otherwise agreed upon, we shall charge for printing, reproduction, deliveries, transportation, and other expenses.

A fifteen (15) percent fee for administration, coordination and handling will be added to all subcontracted services.

RATESCHEDULE
(Valid January 1, 2023 through December 31, 2023)
Principal Engineer
Senior Engineer
Project Engineer
Senior Designer
Administrative Assistant

REIMBURSABLE EXPENSES
Reproduction
Consultant Services
Commercial Travel & Subsistence
Mileage
Agency Fees
NuMarc US, Inc. —
Real Estate Services & Con�sulting�:'

HOURLY RATE
N
230.00
220.00
185.00
130.00

70.00 RATE
Cost+ 10%
Cost+ 10%
Cost + 10%
per IRS guidelines
Cost
2023 RATE SCHEDULE

PROFESSIONAL SERVICES HOURLY RATE
Right -of -Way Acquisition Services 120.00
�3"

%31"'WILIP

PAVEMENT
rI a WIRR110.11
Document Preparation and Project Services
$ 105.00/hour
CAD/GIS Design Engineer
$ 123.00/hour
Staff Engineer or Geologist
$ 165.00/hour
Senior Staff Engineer or Geologist
$ 182.00/hour
Project Engineer or Geologist
$ 205.00/hour
Senior Engineer or Geologist
$ 240.00/hour
Associate Engineer or Geologist
$ 260.00/hour
Principal/Director
$ 285.00/hour

FIELD INSPECTION & TESTING SERVICES
Staff Engineering Technician
$ 105.00/hour*
• Services provided under direct supervision of a Senior Engineering Technician Senior Engineering Technician
$ 124.00/hour*
• Inspections for soils/grading, asphalt, concrete, batch plants, piles/caissons, etc. • Certifications by ACI, ICC, Caltrans, local jurisdictions, etc.

Registered Special Inspector (No 4-hour minimum)
$ 124.00/hour*
• Certifications by ACI, ICC, Caltrans, local jurisdictions, etc. • Reinforced concrete, Post -Tension, Masonry, Welding, Bolting, Fireproofing Instrumentation Engineer
$ 165.00/hour
• Slope inclinometer and Piezometer monitoring
• Manometer for floor -level surveys
• Stormwater turbidity & pH meter
• Groundwater monitoring - pressure transducer, datalogger, water chemistry meter, etc.
• Pipeline video camera for drains, wells, etc.

Engineering Seismological Technician (includes 3-channel seismograph) $ 165.00/hour
• Blast vibration monitoring
• Construction vibration & noise monitoring (pile driving, drilling, demolition, etc.) 'Notes:
(1) Rates include vehicle, nuclear density gauge, and equipment for testing, inspection, and sampling. (2) No 4-hour minimum charges apply, except for night work. (3) Overtime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project in excess of 8 hours per day and all time on Saturdays, Sundays, and holidays. (4) Prevailing Wage projects, additional hourly surcharge for Field Personnel per CA Labor Code § 1720, et seq.

Add $ 32.00/hour

LABORATORY TESTING SERVICES
Laboratory Testing
$ 133.00/hour
(For special materials testing and laboratory costs on a per -test basis, see GMU's Laboratory Fee Schedule)

OTHER CHARGES
Outside Services
Cost + 15%
Reimbursables & Reprographics
Cost
°.;.:�:.

The following section illustrates RICK's planning philosophy, organizational structure and management plan for the professional services tobeprovided.

Our Philosophy
"We view ourselves as an extension of the
Providing as -needed professional engineering services
requires a company with the resources, knowledge, and
experience toconcurrently complete requested tasks while meeting both schedule and budget requirements. VVeoffer obroad range ofseamlessly integrated design disciplines that are managed in-house tofacilitate optimum project
quality, efficiency, and delivery.

The RICK approach totask-order contract management is
comprehensive and employs industry best practices for
staff assignments, workflow processes, master scheduling, communication, coordination, and quality. VVeview
ourselves as an extension ofour clients' staff; therefore, vveproactively meet with our client counterparts, sothat project goals and critical constraints are identified early in the design process and revisited frequently. VVesuccessfully act onomoment's notice toaddress concerns, provide
guidance and expertise, and facilitate engineering design services while meeting critical scheduling deadlines.

Our proven task -order management approach allows us
tomanage multiple task orders ofvarying complexity
simultaneously.

Organizational Structure
Asmentioned above, RICK offers acomprehensive suite
ofdesign, engineering, and planning services, all under one corporate roof. Each discipline isheaded byasenior- executive |eve|Prinoipa|,overseeingtheoperations,
finance, and executive level management ofthe contract
and this individual is the liaison tocorporate services and support. Each Discipline ordepartment ismade up
oftalented designers, engineers, and project managers.

With multiple resources available, RICK can respond tna task order request a10moment's notice. Support service
team members include QA/QCManagers, Environmental
Specialist, Field crews training and professional
development leads, and administrative support, among
others.

For this particu|arOn'[aU Contract, our team will be led by Barry Cowan, PE, as Principal -in -Charge, providing overall contract management, provision ofresources,
and oversight on all projects. Joe Hammond, PE, QSD/P,
will serve asProject Manager, directly managing each
assignment with support from key and support staff He will also identify and coordinate any RICK resources needed.

Barry will also serve esCA/QCManager, assuring the
quality and continuity ofall deliverables.

Management Plan
The cornerstone to our Project Management Approach is
communication: with you, the client; with the internal team and subconsu|tants;with oversight agencies, and with the local community. We believe project will succeed only
when all ofthese communication avenues and resources
are actively engaged.

R|CK\Management Plan for the City ofDownev's On -Call
Contract has been acritical component tothe successful
completion ofthousands ofon-call contracts. Our plan
iscrucial for ensuring that on -call resources are available when needed, and that they are used efficiently tomeet
and exceed your goals.

Key components of a management plan for an on -call
contract:

Contract Overview and Understanding
Defining Roles and Responsibilities
Creation ofOn-Call Contract Schedule
Communication Protocols
Resource Availability and Accountability
Document Management
Cost Controls
Contingency Planning

RICK is committed to provide staffing resourcing necessary to complete anticipated tasks involved, In the event of a high volume of work or an emergency, each staff member
will be able to extend their time and effort to meet the unexpected conditions. With 11 professionals in Irvine
and more than 240 in Southern California, we have the
flexibility to react to peak workloads and the breadth of services to meet the specialized needs of the as needed tasks the City anticipates with this contract. We have
to be able to form local team assignments, which will meet scope and schedule requirements for this contract and have a proven track record of responsive, on -time, and within - budget projects.

Our goal with every contract istoachieve client satisfaction, not only with the final product, but with the process
aswell. VVeunderstand that the best relationships are
those based upon open, candid communication. On any
task we execute, adherence to schedule and budget is of Delivering quality products isafoundational component of R|[K'sbusiness practice. The RICK Quality Assurance and Quality Control Program iscomprehensive and based on
proven practices and years of experience. With more than six decades ofexperience, RICK has
earned areputation for producing
high -quality work, asevidenced by
its many long-term clients. Nnmatter
the project size, weare committed
tounderstanding our clients' needs,
meeting the quality requirements and
standards specified, and surpassing
our clients' expectations.
utmost importance. Potential challenges are identified at the outset toavoid adverse effect tothe City'sschedule
and budget. Subsequently, atthe onset ofevery task,
we conduct field research to better acquaint ourselves
with the task's dynamics. VVeput careful forethought into identifying potential opportunities and constraints atthe initiation ofthe process tnensure effective and efficient mitigation measures. We understand that design must not only work on paper but must provide for construcbbi|ity and minimal disruption tothe stakeholders and citizens.

We take seriously the financial restrictions that exist for every project and understand the responsibilities faced byagencies toprevent revisions tnthe project budget.

Timeliness, accuracy, and cost -adherence are the hallmarks of RICK task. With this in mind, we commit the required and appropriate resources necessary to complete tasks on time and within budget.

As a matter nfpractice, RICK promotes a continuous
emphasis and commitment 10quality control through
all project phases. This isfacilitated byattention to
the Company's Manual on Quality Control Standards,
periodic quality control seminars, peer
reviews, and staff performance reviews
throughout the year. These measures are
applied toall levels ofwork, including
project scheduling, internal reviews,
record keeping documentation, and plan
preparation. For each project, aquality
control plan isprepared, and the assigned
Project Manager maintains the requisite
checklists, Quality control reviews are
coordinated byour [A/QCManager and
conducted byanindependent Project
Manager throughout the development of
a project.

The following is additional data that may assist the review committee in understanding RICK's qualifications and expertise.

This includes testimonials, commitment to professional education of staff, and the total number of permanent employees with RICK.

Customer Testimonials vouch for our management skills, response time, quality and our ability tocreate value in outstanding work.

Commitment to Professional Staff Education
RICK provides value -based virtual and in -person
technical training programs on a variety of subjects to employees atevery level throughout the organization.

RICK offers leadership programs for professional
training and development, specific discipline training, career mentoring, and atrain ing'materia| resource
center. Additionally, vveprovide specific new -employee training sessions, which are designed tofamiliarize
new -hires with core work responsibilities, corporate
standards, company culture, and company services.

Industry -offered workshops and seminars designed
toexpand technical skill sets, teach innovative
technologies and software, orimprove service and
efficiency are continuously evaluated for value and
relevance toour employees. Our Education Training Committee identities and publishes an extensive list of outside seminars each year. From this list, employees and supervisors may choose desired training. Also, the committee identifies individuals whose experience, education, and aptitude demonstrate their readiness to become project managers. These individuals are sent to the American Council of Engineering Companies' (ACEC) Future Leaders Program or Project Management Training to prepare them to be successful in their new project management role.

RICK has the ability to provide insurance as appropriate covering professional liability, general liability, workers compensation, ect., as shown below.

T �
Ate. CERTIFICATE F LIABILITY 1
DATE (MM1DDtYYYY)
8/3/2023
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER

CONTACT
NAME: Certificate Department
Cavignac
451 A Street, Suite 1800

PHONE FAX
619-744-0574 A/c No : 619-234-8601
ADDRESS: certificates cavi nac.com
San Diego CA 92101
INSUREI AFFORDING COVERAGE NAIC #
INSURER A: Valley Forge Insurance Company 20508
INSURED RICKENG-01
INSURER B : Continental Casualty Co.
20443
Rick Engineering Company
36 Discovery, Suite 240
INSURER c. Amer Cas. Co of Reading, PA
20427
Irvine, , CA 92618
INSURER D : XL Spe�Company
37885
INSURER E :

INSURER F :

COVERAGES CERTIFICATE NUMBER:2122661307 REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR

ADDL SUBR

POLICY EFF

POLICY EXP

LTR TYPE OF INSURANCE
D D

POLICYNUMBER MM/DDIYYYY

MM/DDIYYYY
LIMITS

A X I COMMERCIAL GENERAL LIABILITY
6076046485 1/1/2023
1/1/2024

EACH OCCURRENCE
$2,000,000

CLAIMS -MADE X OCCUR
PREM SES (E. oecurroence)$
1,000,000
MED EXP (Any one person)
$ 15,000
X Cross Uab. Inc.

X Separation of In

PERSONAL & ADV INJURY
$ 2,000,000 111111111111111111111
GE_N'L AGGREGATE LIMIT APPLIES PER:

GENERAL AGGREGATE
$4,000,000
_

X X PECOT- X

POLICY LOG

PRODUCTS - COMP/OP AGO
$4,000000
Deductible
$ 0
OTHER:

B AUTOMOBILE LIABILITY
6076046499 1/1/2023
1/1/2024

COMBINED SINGLE LIMIT
JEa acc„ident)
$1,000,000

X ANY AUTO
BODILY INJURY (Per person)
$

OWNED I ISCHEDULED

AUTOS ONLY AUTOS
BODILY INJURY (Per accident)
--- --
$

PROPERTY DAMAGE
Per accident
$

HIRED NON -OWNED

AUTOS ONLY AUTOS ONLY
$

UMBRELLALIAS
OCCUR

EACH OCCURRENCE
$

AGGREGATE
$

EXCESS LIAB

CLAIMS -MADE
DED RETENTION $
$

C WORKERS COMPENSATION
WC 676046521 1/1/2023
1/1/2024

X STATUTE EORH
AND EMPLOYERS' LIABILITY Y t N
-- _—
......... ......... ...

ANYPROPRIETOR/PARTNER/EXECUTIVE
E.L. EACH ACCIDENT
$ 1,000 000
OFFICER/MEMBEREXCLUDED?
N/A
------- ------
------ - ---- ----- -----
(Mandatory in NH)
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
If yes, describe under
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
DESCRIPTION OF OPERATIONS below
D Professional Liability
DPR5016700 8/15/2023
8/15/2024
Each Claim
$5,000,000
Aggregate
$10,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS t VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) For Informational Purposes Only. Professional Liability - Claims made form, defense costs included within limit.

CERTIFICATE HOLDER CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

Specimen Certificate

AUTHORIZED REPRESENTATIVE
..i
© 1988-2015 ACORD CORPORATION. All rights reserved.
•'i i ...t •'i III'.
m3"ffiffiffmiVNEIM

Below is a summary of litigation Rick Engineering Company is or has been involved. There are no other litigation, mediation or regulatory actions to report as described in the Request for Proposal.

REC is or was a defendant or cross -defendant in each of the actions below, but not the main defendant in most of them.

City ofChula Vista
Elite Athlete Training [enter
O9/O6/2O19
2016
Construction Claim
Not Stated
Settled
Confidential Settlement
37-2019-00047190
Superior Court ofCalifornia,
County of San Diego
HanshawDevelopment Co
2O15,LL[
O9/27/2Ol9
2019
Construction Claim
$250,000
Settled
Confidential
M[[ 1901135
Superior Court, California,
Riverside
Project Owner:

Date of the Claim:

Basis of Claim:

Claim or Suit Amount:

Current Status:

Case No.:

Black Mountain Ranch LLC
0S/10/Z015
05/30/20U3
Construction [|ainn
Unknown
Ongoing
N/A
37'20I5-00033538
Superior Court, California,
Riverside
MerbaQeHomes, Inc
UQ/11/2O21
2011
Construction Claim
$5,000,000
Settled between Diamante&
K4eri1age/Ongning
Confidential
A4AO1-21-OO1S-24O3
Arbitration, Phoenix, AZ

4aour response tothe REP example project described in
Section D. "Allocation of Resource" we provide our Scope of Work tocomplete this OPproject inconjunction with our
Allocation ofResources tocomplete said example project. Our scope nfwork clearly defines the allocation nfresources necessary tosuccessfully complete the project.

Our understanding ofthe example project is to add a second eastbound tonorthbound left -turn lane, and aneastbound tosouthbounddedicated right-turn-on|ylane. This work
will require the acquisition ofright-of-wayfrom Bake Plaza located atthe southwest quadrant ofthe intersection. Please refer toattached Preliminary Geometric Exhibit that shows a possible geometric alternative for the requested intersection improvements. The work will also require amodification tn the existing traffic signal, aswell asdry utility coordination for relocations. |tisnoted that this intersection islocated 2,OOO' from our office, giving usaunique understanding ofthe
components and operation ofthe intersection.

Based nnthe existing street name signs onthe traffic signal mast arms, kappears that the traffic signal isunder the operation ofthe City ofIrvine. The City boundary between Irvine and Lake Forest isthe northerly right-uf-woyline ofBake Parkway per County ofOrange G|S.VVeanticipate that the
work for the improvement ofthis intersection will need tube processed with and through the City ofLake Forest, aswell as coordination with the City ofIrvine. |fneed be, vvewill support the City ofLake Forest inthe coordination with City ofIrvine; but will leave the lead ofthis action tuthe City ofLake Forest.

It isalso noted that the traffic signal system along Bake Parkway is interconnected through a previous contract lead by OCTA. |napproaching projects where our client isalocal public agency such asthe City, RICK believes weare, and performs as, an extension of the public agency staff
Both the project manager and project engineer proposed
for this major street intersection improvement project are experienced and knowledgeable inmanaging projects with
multiple subconsu|tantsand coordinating with multiple
municipal, utility, and regulatory agencies. Our team isalso well -versed in, and accustomed to, successfully meeting tight and demanding schedules. The schedules ofmany ofour public works engineering projects are driven byprior commitments such escertain funding obligations, scheduled school openings, ortoaddress local citizen safety concerns.

Having successfully prepared both public agency project entitlement documents and construction PS&E,weunderstand the importance ofcommunication between local agencies and other project stakeholders. Our general project approach to public street improvement type contracts relies unthis
communication. Communication with the City and other project stakeholders facilitates successful completion ofthe project tasks. This approach has been proven when performing
previous and current locally funded traffic, transportation and on -call design service contracts.

Throughout the work process, RICK staff would refer tothe company's Quality Control Manual and complete checklists that would bereviewed bythe quality control officer and the project manager. This ensures that every task isperformed with the utmost care and attention to detail.

1. Preliminary Data Research & Review
RICK team will research, obtain and review available data asa reference to prepare the preliminary GUALITY
and final PS&E.Data includes: State, MANUAL
County, City, utility and other records/
documents; existing street, signal,
storm drain, gas, sewer and water
main improvement plans; topographic
data maps, record drawings; wet and
dry utility plans (to determine size and
|ocation);survey centerline and private
property monument data; and other pertinent information.

Utility records request letters will besent tothe franchise and public utility agencies. These requests will betracked via atable summarizing the request letters, the obtained data, both with dates sent and received. Acopy ofthis table will beprovided tothe City and utility agencies. VVewill review the acquired information with the City prior tobeginning any surveys and preliminary design.

We recognize that some utility companies treat as -built requests and plan coordination with low priority and therefore itwill beincumbent upon ustostart the research and
coordination process upon receiving aNotice toProceed for the project from the City. Furthermore, asmentioned above we will keep acomplete and accurate log ofcommunication with the various utility companies and keep the City informed ofour progress in this effort.

Careful consideration 1uthe existing utilities and their potential impact onconstruction cost and schedule will betaken into account throughout the design process.

Acomplete and accurate plotting ofthe researched utilities will beperformed inorder 10achieve autility base file for the plan preparation phase ofthe contract.
2,Design Survey/Existing Conditions
Documentation
RICK will perform the topographic survey bvincluding features that will influence the project design. The survey shall be |nconformance with the State Land Surveyors Act and be
performed under the direct supervision ufa[ARegistered Land Surveyor. Consultant shall use California State Plane Coordinate System, NAD83,Zone \(USSurvey Feet.

Tasks will include the following:
l\ Establish horizontal and vertical survey and construction control for the complete length of the project.
2)Perform topographic he|dsurveythroughconventiona|
survey methods, asrequired, along the eastbound lanes of Bake Parkway toinclude the existing median (1,5OO|f)and suuthbuundlanes along TrabucoRoad (6OOit).and will include, but not be limited to:
- Roadway half -width cross section elevations taken in the traveled way a1254tintervals (minimum)and grade breaks.

The sections will include back ufsidewalk, top ofcurbs, gutter Mow|ines, lip ofgutters and lane line striping.
° Locate features within the Bake Plaza including driveways, tops and toes ofslopes, limits ofparking area, curbs, trees, monument signageand found private utility appurtenances. ° Locate existing improvements within the street ri8ht-of-way (i.e.above ground utilities, manholes, valve covers, utility vaults and covers, signs, trees, utility poles, traffic signal poles, cross gutters, local depressions, catch basins, sidewalks, pedestrian ramps, etc).
-ReduoedatatuafmrmshVwingcentedinestatiuning,ofset
from centerline, and elevation.
3)Our survey will include
anaerial photogr metric
mapping ofthe intersection
that will graphically locate
existing topographical
features such assidewalks,
walls, tree canopies, striping
and utility appurtenances.

This aerial mapping will
then beenhanced with the topographical field surveys to provide acomplete and accurate topographical map. The aerial photography will beorthorecdfiedfor use onscalable exhibits as needed.
4)Our survey will also tie out centerline monuments
and identify them in the design survey. Locate any other monuments within the project limits, including those ontops of curbs, sidewalk cxinthe parkway. This will allow for anaccurate plotting ofthe road centerline and Right-nf-VVay
5\RICK will perform aboundary survey onthe Bake Plaza
property tofacilitate the preparation ofthe right+rf-waytake legal descriptions and plats for the acquisition process.

G)Our survey crews will provide traffic control, asrequired, during our survey operations. Lane closures will hein
accordance with the City ofLake Forest standards and the California K4UT[D2Ol2 Edition.

3.Site Visit / Analysis
RICK, along with our subconsultants, will meet at the site to discuss the project collectively. Recommendations will be developed toimprove the design safety, efficiencKsustainabi|ity, and aesthetics aswell asreduce construction and maintenance costs.

Wewill then meet with City staff to review the design tean's recommendations and discuss the [itv'sspecific areas of concern and priorities with respect tothe pnoject'sconstruction budget. Immediately following this meeting, comprehensive meeting minutes will beprepared and sent tothe City and the rest ofthe project team.

While atthe site, existing sidewalks and pedestrian ramps in the vicinity ofthe project that will remain through construction will bechecked for damage and current ADAcompliance.

Arecord ofall damaged and non -compliant facilities (i.e. cracks, differential settlement, uplift from tree roots, orother abnormalities) will beprepared. Where feasible, repairs will beadded tothe improvement plans. Asign survey will also be conducted and any damaged signs orsigns that don't meet the current standards ofthe latest MUTCDwill benoted.

4.Geotechnical
The RICK team geotechnica|consultant, GK4U,will provide a pavement analysis report for the widening ofBake Parkway for the designated right turn lane. The tasks perform for this work - Site Visit and Pavement Surface Condition Assessment
Field explorations that include two shallow borings (up to17 in depth).
- Laboratory testing
- Pavement Evaluation and Materials Report
S. Conceptual Plan
RICK will prepare aconceptual plan ofthe project
improvements for review bvthe City. The preliminary layout will include horizontal geometry ofthe proposed striping, curbs, traffic signal poles, retaining walls, and utility appurtenance relocations. Typical roadway section will bedepicted aswell as site sections Lopictorially convey project impacts. Conceptual plan will include site impacts toBake Plaza aswell aspossible site re -design if required.

6. Construction Plans
RICK will prepare project PS&Etoa65%,95%,and 10O%
completion level for submittal tothe City for review, input, and comment. Upon receiving plan check comments from the City, vvewill review the comments and make necessary revisions tothe P6&Epackage and submit afinal set ofconstruction
documents tothe City. The comments will beaddressed in
writing either onthe plans orina"response tocomments"
letter.

All plan sheets will conform tothe City format and the latest applicable design/drafting standards,
The following isalisting ofplan sheets with corresponding scale with estimated number of sheets to be used.

PLAN DESCRIPTION

TITLE SHEET
IONS

CONSTRUCTION NOTES AND

DETAILS

ROADWAY IMPROVEMENTS

PLANS AND PROFILES

GRADING/RETAINING WALL
PLANS

SIGNING AND STRIPING
PLANS

TRAFFIC SIGNAL MODIFICA-

TION PLAN
Title Sheet will include project tide, vicinity map, general notes, benchmark with basis ofcoordinates, dig alert information, list nfutility companies with contact name and telephone number, list ofstandard plans grouped byagency (i.e.APVVA City ofLake Forest, etc),and legend ofsymbols.

Typical Sections will show hglines, dimensions
between curbs, existing pavement surface and ou r,
existing roadbed, proposed roadway improvements, grading/ c/ossfa||slope, and existing/proposed channel improvements Construction Notes and Details will include aconstruction notes with estimated quantities and construction details.

Structural details for the channel headwalls/retaining walls, channel lining and other channel stabilization items will be shown here. Also included here will beutility and paving notes Roadway Improvement Plan& Profile will show all existing conditions, asshown onthe base sheets and all existing
underground utilities (sewer; water; power; communication; gas mains and associated laterals; storm drains; catch basins and laterals, manhole and valve covers, meter boxes, etc).

Proposed improvement work shall indicate limits ofroadway widening, including removals and replacements; limits ofA[ pavement cold planing, overlay and/or rehabilitation areas; adjustment ofmanholes, vaults and valves tograde. Plans also shall indicate removal/replacement ofcurbs, gutters, sidewalks, access ramps, parkway/curb drains and protection ofexisting facilities. At minimum, each sheet shall contain a north arrow, scale, match lines with station and sheet reference, plan and profile construction notes for all improvements onthe sheet.

Profile shall show existing and proposed tops ofcurb elevations with corresponding station and slope ofcurb between each grade break, For pedestrian ramps, elevations at8[Rand ECR and "join existing" will beshown appropriately. Elevations also will beprovided atquarter points. Dimensions ofthe distance between each quarter point and the length ofthe curve will be shown.

Grading/Retaining Wall Plans will be prepared for the addition ofthe designated right -turn lane. These plans are primarily for grading operations and shall show required grading, retaining walls and wall drainage needs. Appropriate grading and
retaining wall notes and details will also beshown onthe plans, with top of wall and footing elevations in profile view.

Signing and Striping Plans will be
prepared for Bake Parkway and
TrabuooRoad/Irvine Boulevard
intersection. The plans shall be
prepared inaccordance tothe City
standards and design criteria, the
California MUTCD2O22 Edition,
and the [a|transStandard Plans
and Specifications (latest edition\.

Plans will show existing and
proposed signs within the project
limits and proposed pavement
delineation and pavement legends/arrows within the project limits
Traffic Signal Modification Plan will beprepared using City standards, City ofIrvine Standards, [altransStandard Plans, and the California Manual onUniform Traffic Control Devices (K4UTCD).Key design components ofthis traffic signal will be continued protected left -turn phasing for the dual eastbound left -turn move onBake Parkway, and countdown pedestrian signal heads and bicycle detection for the additional right turn lane, which are requirements of the current K4UTCD.

Additionally, tomeet ADArequirements, pedestrian ramps
with truncated domes are required for all four corners ofthe intersection. During our site visit for the proposal, i1appears asthough all four corners currently meet the ADAaccess
requirements. This will beverified during the design, and if deficient, improvements will becalled out onthe construction plans with the appropriate Orange County Public Works
Standard Plan detail. The traffic signal modification plan will be prepared at2Oscale, and will show centerlines, right-of-wa% above ground and underground utilities obtained from the field visit and record drawings, and all signal equipment and striping.

Traffic Control Plans will bedesigned inaccordance with

wmrkonthese plans, Rick Engineering will meet with the City todiscuss and determine construction staging, minimum lane requirements, and driveway access, and plan notes and legends.

7. Specifications and Cost Estimates
Aswith the project plans, RICK will prepare project
specifications and cost estimate atthe 659,Q5%,and 1OQ% completion level. Upon receiving plan check comments from the City, wewill review the comments and make necessary revisions tothe PS&Epackage and submit afinal set of
construction documents tothe City for bidding.

The project specification will beprepared using the City's standard "boiler p|a1e"specifications and wewill prepare the Special Provisions portion ofthe Construction Specifications and Contract Documents suitable for bidding and awarding of the Contract. These special provisions will beincorporated into the Oty'sstandard construction document package. This work includes the preparation ofthe Bid schedule.

RICK will perform comprehensive quantity take -offs for construction items. VVemaintain acomprehensive list of
construction unit prices from awide array ofpast projects.

The unit prices used for this estimate ofprobable cost will be derived from recent projects ofsimilar scope and/or provided information from the City.

8.Water Quality Compliance
Along with the pnoject'sPS&Epackage, RICK will prepare a Water VVQMPtoa1O0%completion level prior tothe first
submittal. Upon receiving plan check comments from the City, vvewill review the comments and make necessary revisions tothe VVQMPand submit afinal copy with the rest ofthe
construction documents tothe City for bidding.

RICK isatthe forefront when itcomes tomatters related to storm water Our water resources staff includes many registered OSD/CSP'sand, infact, provide the industry with training on aregular basis through our in-house registered Trainers -of -Recnrd.VVewill provide calculations and take -offs aswell asprepare aRisk Assessment prior hzbidding. |tisassumed that the City will provide Rick Engineering with the desired construction start date and anticipated duration atthe time the Risk Assessment isneeded. |fitiolater determined that the City requires a review ofthe contractor's SVVPPR RICK has the experience and ability toperform the task.

9. Legal Description and Plat
VVewill prepare hght-of-waylegal description and plat for the single property right oftake required for the addition ofthe designated right -turn lane.

10. Right -of -Way Appraisal and Acquisition
Services
RICK Team sub-consu|tant,Paragon Partners, will perform right- of-wayappraisa|ondacquisitionsemicesforthesing|eproperty take on Bake Plaza. This work will entail:

Obtain aPreliminary Title Report
Perform hght-of-wayappraisal for the property take
- Perform Property Owner negotiations
- Perform escrow coordination/title clearance

11. Utilities Coordination
For the purposes ofpreparing this proposal, wehave performed aninitial site observation. Potential conflicts and needed coordination between the proposed construction and the
existing utilities can beseen incertain locations within the project area. Careful consideration tothe existing utilities and their potential impact onconstruction cost and schedule will be taken into account throughout the design process.

Upon receiving aNotice toProceed from the [ityR|CKwill
perform athorough site investigation that identifies and documents observable utilities. City records will beresearched and record "as'bui|t"documents will beobtained and reviewed.

The affected utility companies will beimmediately contacted and existing utility overlays will be obtained.

Acomplete and accurate plotting ufthe researched utilities will be performed in order to achieve a utility base file for the plan preparation phase of the contract.

Upon completion ofthe 65%,95%
and 28O%submittal packages to
the City, plans will bedelivered to
all appropriate utility companies
for their review. Comments will
beactively solicited from those
companies and all coordination
items will beaddressed onthe
plans and inwriting toeach
company. Tbthe extent that the
various utility companies are
willing, final written confirmation
ofthe utility company's
concurrence with the design will
beobtained. VVerecognize that some utility companies treat as -built requests and plan coordination with |mm priority and therefore it will be incumbent upon us to start the research and coordination process as soon as possible. Furthermore, we will keep acomplete and accurate log ofcommunication with the various utility companies and keep the City informed ofour progress inthis effort.

Since there is acquisition, and the widening
may impact an existing parking area, there may be a need for an Initial Site Assessment (|SA) on the project. Therefore, if environmental analysis and reporting needs toheperformed, and the City isnot performing this work, vvecan add a
uubconsu|tanttoour team, per City'sapproval, tocomplete the environmental work.

12. Project Management and Meetings
The key toasuccessful project isthe establishment ofasound project foundation which isset early inthe project process. Tb accomplish the project goals wewould begin byenacting some fundamental services and techniques. Prior to beginning any ufthe specific tasks above, wewould organize and manage a kick-off meeting, which would verify the pnoject'sprecise scope ofwork, schedule, and priorities and determine the need, frequency and time of any subsequent meeting(s). This meeting would immediately befollowed-up with a distribution of
meeting minutes toall attendees and other interested parties.

RICK would then commence work onthe project and give
frequent progress reports tothe City. VVepropose the following meeting schedule:
e Kick-off meeting
- 95% Completion Meeting
Throughout the work process, RICK staff would refer tuthe company's Quality Control Manual and complete checklists that will be reviewed by the quality control officer and the project manager This ensures that every task isperformed with the utmost care and attention to detail.

13.ConStruction Engineering Support (Post
Award)
RICK recognizes the importance oftimely responses toCity requests particularly during the construction phase ofthe project. The RICK project manager will remain the single Pnint-of-[ontactfor the City throughout the duration ofthe project, This project manager will maintain anopen line of communication and beavailable 10respond tothe [ity's
request with high priority. |twill bethe project manager's responsibility tofield requests from the City, solicit input from other team members and provide aresponse inaprompt and
thorough manner. |twill becritical that all correspondence with the contractor gothrough the City, beinwriting and inthe format preferred bythe City. The Project Manager will remain responsible for Q\ Q[1hrouQhoutthe construction phase. The project manager will continue tooversee the completion ufthe Rick Engineering Quality Control Manual checklists and review all responses toRF|sand submittals prior todelivery tothe City. |fconstruction inspection services are requested, our
subconauhzn1MurowCM, will provide. The scope ofwork
for these services can bedetermined atthe onset ofthe
construction bid process.

Example: Allocation of Resources
Sake Parkway & Trabuco RoadJlrvine Boulevard Intersection Improvements, Work TAA or Itern*

DESCRIPTTON
..........

N
TP1LAN$&PN,()FPLE$
SR(MMAYIPAP"M
GRA01 WAL,L1 PL,AN& PROMIC, ...... . . . ............

ON.

M:TR,Arric
sioNokt, mooirlf�ATI()N P
TRAFF�C CONTROL PLANS
Right of Vft Appraisal A Acquisition

ATTACHMENT E

Stantec Stantec Consulting Services Inc,
38 Technology Drive, Suite 200
Irvine, CA 92618
October 13, 2023
Attention: City of Downey
Mr. Matthew Baumgardner, PE
Director of Public Works/ City Engineer
11111 Brookshire Avenue
Downey, CA 90241
Reference- On -Call Consultant for Civil Engineering Services - RFP No. 23-002 Dear Selection Committee:

Maintaining quality services for our communities while managing capital improvement budgets requires a seasoned and effective approach. For the City of Downey's (City) needs, an on -call consultant is the most efficient way to implement your upcoming projects. Stantec Consulting Services Inc. (Stantec) has designed a team specifically for you. Our proven and respected professionals are committed to quickly respond to your needs. With our experienced and flexible team that can successfully support multi -disciplined engineering projects simultaneously, your projects will be in good hands.

Team plus client compatibility equals experience. Most of our key team members have worked with you for years and have developed professional and successful relationships. Drawing on this experience, we will seamlessly merge to keep your projects a priority —moving forward efficiently and on schedule. Our team has worked on numerous on -call, local civil engineering and surveying projects, creating effective synergy throughout project delivery. We also support nearby communities on similar types of projects and our experience, as outlined herein, reflects the necessary services you require —highly qualified to meet your standards.

Practical project creativity and attention to detail. We are committed to designing innovative, implementable, and safe public infrastructure throughout your City. Through our extensive experience managing numerous on -call projects, we understand the process from task order conception through final project delivery. We are familiar with your project requirements and standards, so there is no learning curve with our team. We have the know-how, staff availability, and resources to quickly respond to your project's needs, and encourage you to contact our references who can attest to our accurate, thoughtful, and advantageous approach and implementation.

Our principal and main point of contact, Mohammad Heiat, PE, is authorized to bind our team to all terms and conditions in your RFQ herein. Jeff Wilkerson, PE, will serve as Project Manager, just as he has for numerous City projects. Together, they will assemble the required team, develop the required work plan and execute tasks in a timely manner. We look forward to the opportunity to continue work with City and have the available resources to commit to projects immediately. Should you have any questions regarding the information contained in our statement of qualifications, please feel free to contact Mohammad or Jeff at the email addresses and/or phone numbers provided below.

Sincerely,
Mohamrymd Heiat PE
I A&WY\
J­ f Wilkerson PE
Senior Project Manager (Civil)
Mobile: (949) 929-1449
E-mail: [email protected]
IN=

Table of Contents

1. Management and Organization .................................................. 1 Company Background ..................................................................... 2 Organizational Chart ....................................................................... 3 Personnel Qualifications ................................................................. 4 Resumes.......................................................................................... 5 Subconsultants Profile .................................................................... 9 Relevant Projects ........................................................................... 10 FeeSchedule ................................................................................. 15

2. Team • and • .............................................. 16 Approach to Projects ..................................................................... 16 Work Plans for Specific Services ..................................................18 ProjectControl ................................................................................ 21 References...................................................................................... 24 atIOT----------------------------------- ............... 27 Insurance........................................................................................ 27 Litigation......................................................................................... 27 ContractRevisions ......................................................................... 27 IN=

Communities are fundamental. Whether around the
corner Oracross the globe, they provide
fOUOdatiOD.a sense Ofplace and Dfbelonging. That's
why BtStaOteC'YYealways design with community iO
The St8nteCcommunity includes more than 28.00O
employees working inmore than 4OOoffices Onsix
continents. Our team collaborates across disciplines
and industries tDbring water, buildings, energy and
resource, environmental, and infrastructure projects
to life. Our work —engineering, architecture, interior
design, landscape architecture, surveying,
environmental sciences, construction management
services, pr . eCtmanagement, and project
economics —begins atthe intersection Df
community, creativity, and client relationships.

Our duration and depth of services in Southern
California delivers the experience, local
understanding, and regional support tOassist you
with all 0fyour planning, resources and design needs
throughout the City OfDowney.

We have 8S3iSt8d our clients with similar on -call
contracts throughout in 3OUthe[O California. Serving
8diV8[Se base 0fpublic and private sector clients,
3t@OLeChas extensive experience iOproviding
complete planning, design, and technical S8[ViC8S'
services for civil engineering, traffic engineering,
drainage/water quality design, utility design, SU[Vey
and mapping, g8OL8Chn|CGl engineering, landscape
irrigation design, environmental services, and grant
application writing —all in-house.

The City will benefit from the St8OteCteam hyour:
= Staff availability and quick response capabilities
° Excellent communication and comprehensive
coordination Ofall project issues
* Reputation for innovation and value engineering
" Specific attention for completion Ofassigned
tasks ahead and/or OOschedule
= Local knowledge Ofthe area
* Proficiency with City standards and applicable
state and federal regulatory agencies
* Highly qualified project management capabilities
" Comprehensive 0A/OCProgram
5 stantec City ofDowney | On -Call Consultant for Civil Engineering Services RFQNo: 23-0O2 | 1

Company Background
Stantec has 69 ye-irs of experiences providing
sirnilar services, $o thooe re(-,piesled 111 YOUr RFQ. We have the experience to implement your project
assignments. Each team member is committed to
completing the work on schedule and within budget.

We will keep your projects moving forward
seamlessly through close coordination with the City,
Stantec staff, our subconsultants, and key
stakeholders. Your professional service needs will
be met with our team's high quality work, good
communications, and effective project
management. As a well -established local firm,
Stantec has the resources and abilities to provide
personalized service while keeping the work on
schedule and within budget. Our team of engineers,
designers and surveyors excel in enhancing safety
while rehabilitating infrastructure for public facilities that preserves recreational assets and the natural
environment.

Stantec currently has 28 California offices covering
the state. This contract will be managed out of our
Irvine office. As part of a global company, Stantec's
service delivery model is focused on providing
clients with a solid core of locally assigned, highly - capable resources supported by our global
knowledge network. This network gives our clients
broad access to company and industry "best
practices" and the most current information
resources and experiences.

Sending 11
Chico--
Nevada City
Petaluma
R
oseville
Walnut Creek
sac iamerno
San Francisco -
San Jose
Bakersfkfld
Santa Maria
venture
Santa Barbara
Thousand Oaks
Los Angeles
Paramount
Solana Beach
San Diego
Bishop
Stantec Office
Locations in California
Single Office
Multiple Offices
Pasadena
Monrovia
Santa Ana
San Bernardino
Irvine
Aso Viejo
5 Stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 2

Organizational Chart
Manager
Mohammad Heiat, PE
Project Manager
Jeff Wilkersoi, PE 12
Traffic/Transportation
Street & Pedestrian
Engineering/Planning
Improvements
Keith Rutherfurd, TE
Jeff Wilkerson, PE 04
Josh Park, TE
David Lew, PE
Cathy Lawrence TE
Susan Reid, PE
Jacob Lemmon, EIT
Active Transportation and Geotechnical Engineering/
Complete Streets Pavement Design
Sherry Weinmeier, PE, Jaret Fischer, PE
LEED BD+C Shawn Arrianna, Ph.D., PE, GE,
(GAI) *
Structural Environmenta'
Anurag Upadhyay, PE, CRIS, DBIA Michael Weber
Gilberto Ruiz
Dave Lew, PE
Nahid Heidarbaghi, PE
Jeff Dunn, PE
Jim Cathcart, PE
Landscaping/irrigation &
Steve Cook, PLA 13
Katie McNguyen, PLA
Electrical/Lighting
Paul Ericson, PE, DBIA,

LEED AP
P1 Key personnel
* Subconsultant
_!T,MTMg7FN =te 4,TMTt7,
Dan Hayes, PEM',,
Eric Walker, PE
Lynn Diaz, PE
- 77MI, N-W&Y.F.TUM-4
Grea Sebourn, PLS
Peter 6ambino, P'E, PILS
Joe Nelson, PLS
Potholing
Bess TestLab Inc.
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 3

Personnel Qualifications
YEARS
OF
NAME

JOB CLASSIFICATION
EXP.

EDUCATION

REGISTRATIONS
Mohammad Heiat
Principal-in-Charge/Contract Manager
42 MS, BS, Civil Engineering
PE #45776 CA (exp. 12/31/24)
— ------------
Jeff Wilkerson
Project Manager/Civil Task Manager
24 MS, BS, Civil Engineering
PE #63466 CA (exp. 9/30/24)
Keith Rutherfurd
Traffic Task Manager
38 MS, Civil/Transportation Engineering
TE #TR001 647 CA (exp. 9/30/24)
BS, Administrative Studies
Josh Park
Traffic Design
9 BS, Civil Engineering
TE #TR 2856 CA (exp. 3/31/24)
Cathy Lawrence
Traffic/Transportation
. . . . . ........................................................................................... 37 . .

BS, Engineering
TE #163 5 CA (exp. 9/30/24)
Susan Reid
Street Improvement/Grading
30 BS, Civil Engineering
PE #56872 NV (exp. 6/30/25)
Jacob Lemmon
Street Improvement/Grading
2 BS, Civil Engineering
EIT #176650 CA
Dave Lew
Street I mprovement/Grading &Water/
12 BS, Civil Engineering
PE #C8891 5 CA (exp. 9/30/24)
Wastewater System Design
--------- — —
--------- —
-------
Nahid Heidarbaghi
Water/Wastewater/Plan Check Services
22 BS, Civil Engineering
PE #C67658 CA (exp. 6/30/25)

LEED AP
Jeff Dunn
Water/Wastewater Water Well and Water
29 BS, Civil Engineering
PE #58455 CA (exp. 12/31/24)
Treatment Design Specialist
Jim Cathcart
Water/Wastewater Design
46 MS, BS, Civil Engineering
PE #C31518 CA (exp. 12/31/24)
Dan Hayes
Drainage/Water Quality Task Manager
26 BS, Civil and Environmental Engineering
PE #63132 CA (exp. 6/30/24)
Eric Walker
Drainage/Water Quality
13 BS, Engineering
PE #88905 CA (exp. 9/30/24)
Lynn Diaz
Drainage/Water Quality
18 BS, Civil Engineering
PE #55481 CA (exp. 12/31/24)
Sherry Weinmeier
Active Transportation/Complete Streets
39 BS, Civil Engineering
PE #41751 CA (exp. 3/31/24)
Task Manager
- —
------- — -
LEED AP BD+C
— — -----
Jaret Fischer
Geotechnical Eng/Pavement Design Task
31 BS, Environmental Resources
PE #80383 CA (exp. 3/31/25)
Manager
Engineering
Shawn Ariannia
Geotechnical/Materials Report
37 PhD, Geotechnical Engineering
RGE #2824 CA
PE #65642 CA (exp. 9/30/25)
Steve Cook
Landscape Architecture Task Manager
31 BS, Agricultural Business
PLA #4053 CA
Management
CLIA #82148 CA
LLC #C27-52894
Katie McNguyen
Landscape Architecture
13 MS, Landscape Architecture
LA #6100 CA
LLC #981708 CA
Greg Sebourn
Survey/ROW Task Manager
23 AS, Survey- Mapping
PLS #8395 CA (exp. 3/31/24)
Peter Gambino
Survey/ROW/Plan Check Services Task
33 BS, Civil Engineering
PE #55577 CA (exp. 12/31/24)
Manager
—
PLS #7687 CA (exp. 12/31/24)
---------
Joe Nelson
Survey/ROW
13 AS, Survey/Mapping Sciences
PLS #9432 CA (exp. 3/31/24)
Anurag Upadhyay
Structural
21 MS, Structural Engineering
PE #80770 CA (exp. 3/31/25)
Michael Weber
Environmental Project Manager
24 BS, Environmental Studies
N/A
Gilberto Ruiz
Environmental Project Manager
30 MA, Urban and Regional Planning
N/A
Paul Ericson
Electrical/Lighting Task Manager
47 BS, Electrical Engineering
PE #E1 1219 CA (exp. 6/30/25)
1 1
1 1
1 LEED, IALD
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 4

Resumes
Mohamrnad Heiat, PE
Principal -in -Charge / QA/QC
Manager/ Point of Contact
Mohammad offers more than 40
years of civil engineering experience
with extensive emphasis in
transportation and water resources
for a broad range of public works and private residential and commercial development projects. His experience includes an extensive list of capital improvement facilities design, roadway and intersection improvement plans, master plans, runoff management plans, and drainage structures. He has been project principal, quality control supervisor, project manager, and project engineer on the preparation of plans, specifications, and estimates for a long list of public works/ private infrastructure projects with emphasis on highway and street design, drainage and flood control facilities design.

Edt)catlon
0 MS, Civil Engineering
0 BS, Civil Engineering
Registrations:
a Professional Engineer #45776, CA
Relevant project experience
Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Principle -in -
Charge)
Lakewood/Rosemead Boulevard at Telegraph Road
Improvements, Downey, CA (Project Manager)
Lakewood Boulevard Improvements, Phases 3B and 3C,
Downey, CA (Project Manager)
0 Foster Bridge, Rivergrove, and Glencliff Pavement
Rehabilitation Project, Downey, CA (Project Manager)
Paramount Boulevard Median Water System
Improvement Project, Downey, CA (Principle -in -Charge) a Pellet Street Water System Improvement Project,
Downey, CA (Principle -in -Charge)
& 6th Street Water System Improvement Project, Downey,
CA (Principle -in -Charge)
0 Stamps Road Water System Improvement Project,
Downey, CA (Principle -in -Charge)
Ciso Parkway Roadway Widening and Rehabilitation,
Mission Viejo, CA (Project Manager)
Lampson Avenue Bike Lane Improvements and
Drainage Improvements, Seal Beach, CA (Principal -in -
Charge)
Jeff has more than 24 years of civil
engineering experience working for
both public and private clients, with
an emphasis on city and airport
transportation projects. He has been
responsible for the project management, conceptual level design, and delivering final PS&E for projects with a wide range of size and scope. Jeff is known for his hands-on design skills, organizational abilities, and delivering projects on time and under budget. Jeff is an expert in AutoCAD and Civil 3D and leverages this knowledge to create innovative and efficient solutions to complex engineering problems.

Education
& MS, Civil Engineering
0 BS, Civil Engineering
Registrations:
0 Professional Engineer #63466, CA
Relevant project experience
6 Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Project Manager)
6 Lakewood/Rosemead Boulevard at Telegraph Road
Improvements, Downey, CA (Civil Task Manager)
0 Lakewood Boulevard Improvements, Phases 3B and 3C,
Downey, CA (Civil Task Manager)
6 Foster Bridge, Rivergrove, and Glencliff Pavement
Rehabilitation Project, Downey, CA (Civil Task Manager) 0 Paramount Boulevard Median Water System
Improvement Project, Downey, CA (Project Manager)
6 Pellet Street Water System Improvement Project,
Downey, CA (Project Manager)
0 6th Street Water System Improvement Project, Downey,
CA (Project Manager)
6 Stamps Road Water System Improvement Project,
Downey, CA (Project Manager)
0 Oso Parkway Roadway Widening and Rehabilitation,
Mission Viejo, CA (Civil Task Lead)
6 Lampson Avenue Bike Lane Improvements and
Drainage Improvements, Seal Beach, CA (Project
Manager)
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 5

Keith Rutherfurd, TE
Traffic Task Manager
Keith offers more than 38 years of
experience in transportation and
traffic engineering with a broad
background in transportation analysis
A ; design I Li
CIH preparing HY plans. C
performs technical analyses and studies, prepares various reports, and designs improvement plans for numerous
private and public works projects. Keith has also served as an on -call consultant to public agencies. His specific transportation engineering experience includes road
alignment studies; highway and street improvements design, comprising geometric studies, interchanges, and ramps;
traffic engineering, as well as site impact studies, parking and bikeway studies, bus operations, signing, striping, traffic signal, and traffic control plan design.

Education
0 MS, Civil/Transportation Engineering
0 BS, Administrative Studies
Registrations:
0 Professional Engineer #1647, CA (Traffic)
Relevant project experience
0 Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Traffic Task
Manager)
0 Lakewood/Rosemead Boulevard at Telegraph Road
Improvements, Downey, CA (Traffic Task Manager)
0 Lakewood Boulevard Improvements, Phases 313 and 3C,
Downey, CA (Traffic Task Manager)
0 Foster Bridge, Rivergrove, and Glencliff Pavement
Rehabilitation Project, Downey, CA (Traffic Task
Manager)
0 6th Street and Haven Avenue Traffic Signal
Modification, Rancho Cucamonga, CA (Project
Manager)
0 Armstrong Ranch Specific Plan Traffic Study, Ontario, CA (Project Manager),
0 Esperanza Residential Development Traffic Signal
Installations (5 locations), Ontario, CA (Project
Manager)
0 Inland Empire Utility Agency - RP4 Outfall Project Traffic Control, San Bernardino County, CA (Traffic Design
Lead)
0 Etiwanda Transmission Pipeline Phase 1 Traffic Control, San Bernardino County, CA (Project Manager)
0 Paramount Boulevard at De Palma Street and Fire
Station No. 1 Traffic Signal Installations, Downey, CA
(Project Manager)
Dave Lew, PE
Civil and Water Design
Dave has 12 years of professional
engineering experience in both
public and private projects. His
9 technical experience involves dA-7m design and preparation of plans, specifications and
estimate packages for roadway improvements, residential improvements, site improvements, water and sewer systems, and structural design projects. Additionally, Dave has
extensive knowledge in AutoCAD and Civil 3D software.

Education
0 BS, Civil Engineering
Registrations
11MI 111-M "11 1 Fff1T#T1T.—T_qFT.TXVA7'W_'
Relevant project expeneirrice
* Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Project Engineer)
* Lakewood/Rosemead Boulevard at Telegraph Road
Improvements, Downey, CA (Design Engineer)
It Lakewood Boulevard Improvements, Phases 313 and 3C,
Downey, CA (Design Engineer)
0 Foster Bridge, Rivergrove, and Glencliff Pavement
Rehabilitation Project, Downey, CA (Design Engineer)
a Paramount Boulevard Median Water System
Improvement Project, Downey, CA (Project Engineer)
0 Pellet Street Water System Improvement Project,
Downey, CA (Project Engineer)
0 6th Street Water System Improvement Project, Downey,
CA (Project Engineer)
0 Stamps Road Water System Improvement Project,
Downey, CA (Project Engineer)
a Bison Avenue, San Joaquin Hills Road, and San
Nicholas Pavement Rehabilitation, Newport Beach, CA
(Project Engineer)
0 Irvine Avenue Pavement Rehabilitation, Newport Beach, CA (Civil Designer)
0 Camino De Los Mares Improvements, San Clemente,
CA (Project Engineer)
0 Fairview Road Safety Improvements, Costa Mesa, CA
(Civil Designer)
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 6

NaNd Hteidarbag i
Waste and Wastewater
Design
Nahid is a detail -oriented engineer
with 22 years of professional
experience in water and wastewater,
transportation, and land development
projects. She has extensive experience in water and
sewer systems, utility research and coordination, roadway improvements, and land development infrastructure design projects. Her eye for detail and quality control has been instrumental in review of water and sewer plans for Irvine Ranch Water District and other public agencies.

Education
0 BS, Civil Engineering
Registrations-,
0 Professional Engineer #C67658 CA
Relevant project experience
Lakewood/Rosemead Boulevard at Telegraph Road
Improvements, Downey,#(Design
0 Lakewood Boulevard Improvements, Phases 313 and 3C,
Downey, CA (Design Engineer)
0 Paramount Boulevard Median Water System
Improvement Project, Downey, CA (QA/QC Reviewer)
Pellet Street Water System Improvement Project,
Downey, CA (QA/QC Reviewer)
a 6th Street Water System Improvement Project, Downey,
CA (QA/QC Reviewer)
0 Stamps Road Water System Improvement Project,
Downey, CA (QA/QC Reviewer)
0 3rd Street Water System Improvement Projects (CIP
Nos. 20-23 and 21-12), Downey, CA
Hellman Ranch Water Main Rehabilitation, Seal Beach,
CA
a Sunset Beach Alley Water Main Replacement,
Huntington '.(Projectg
Ranch0 Irvine
(ProjectIrvine, CA i
Dan,Hayes, PE
Drainage/Water Quality Task
Manager
Dan has 26 years of civil engineering
experience with extensive experience
in structural analyses and flood
control design, preparation of
construction drawings, specifications, and cost estimates for retaining walls, water systems, storm drain, pump stations, channels, dams and reservoir facilities. He has been involved in the both structural analysis, hydrology, and hydraulic design of earth retaining structures, water recharge, land development, and flood control projects in Riverside, San Bernardino, Orange, and Los Angeles counties.

Education
0 BS, Civil Engineering and Environmental Engineering
Professional Engineer #63132 CA
Relevant project experience
0 Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Project Engineer)
0 Lakewood Boulevard Improvements, Phases 313 and 3C,
Downey, CA (Project Engineer)
0 Pedley Spreading Grounds, Pomona, CA (Project
Engineer)
6 Lampson Drainage Improvements, Seal Beach, CA
(Project Engineer)
0 Forest Lawn Hollywood Hills Storm Drain & Basin L
Improvements, Hollywood Hills, CA (Project Engineer)
0 Forest Lawn Sennett Creek Slope Stabilization,
Hollywood Hills, CA (Project Manager)
0 Forest Lawn Covina Hills Storm Drain, Covina Hills, CA (Project Manager)
6 210 Pepper Project, Rialto, CA (Project Engineer)
Stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 ! 7

Sherry Weinamier, PE, LEED
AP, BD+C
Active Transportation/
Complete Streets Task
Manager
JEF Sherry has provided civil engineering
and design services for public and
private infrastructure projects for more than 39 years. Her design experience includes concept design and feasibility studies through final design services for large-scale master planned communities and transformative transportation
facilities. Sherry has been responsible for the budgeting, scheduling, staffing, and delivery of final plans, specifications, and estimates for a wide range of projects in size and scope.

Her understanding of the detail, as well as the owner goals has resulted in overwhelming success of project delivery on time and on budget.

Education
a BS, Civil Engineering
Registrations:
a Professional Engineer #41751
Relevant project experience
0 Burbank Channel Bikeway Project, Burbank, CA (Project Manager)
0 CV Link, Coachella Valley, CA (Engineering Project
Manager)
0 17th Street Separated Bikeway and Michigan Avenue
Greenway Project, Santa Monica, CA (Project Manager)
G Herondo Street/Harbor Drive Gateway Park and Cycle
Track, Redondo Beach, CA (Civil Lead)
0 Safe Routes to School Projects, Santa Monica, CA (Civil Engineering Quality Control)
0 Santa Ana Boulevard and 5th Street Cycle Tract, Santa Ana, CA (Project Manager)
Steve Cook, PLA, CLIA, LLC
Landscape/Irrigation Task
Manager
Steve's more than 30 years of
combined experience as a Registered
V
Landscape Architect, a Licensed
Landscape Contractor, a Certified
Water Auditor, and a Member of the Environmental Protection Agency's (EPA) Watersense Partnership program provides
him a broad base of valuable knowledge. His years of
experience as a Landscape Contractor working directly
with the materials most commonly used in landscape
construction provide him with a breadth of information
to draw upon for design/buildability/sustainability and also give him valuable insight when conducting site
observations and providing other field construction -related services. Additionally, Steve's experience as a Landscape Architect and a Certified Landscape Water Auditor provide him the knowledge necessary to design the most current
environmentally friendly and efficient irrigation delivery systems. As an EPA WaterSense Partner, he stays abreast of the regional, as well as local policies -enabling him the ability to foresee technological and societal trends, and allowing him the advantage of incorporating relevant new irrigation elements or design techniques into current project designs accordingly.

Education
0 BS, Agricultural Business Management
EN-0. I MI-1
Re�evaint project experience
0 Telegraph Road Traffic Throughput and Safety
Enhancements Project, Downey, CA (Landscap4
Architect)
a Telegraph Median Improvements, Downey, CA
(Landscape Architect)
Jamboree Road Pavement Rehabilitation and Recycled
Water Improvements, Newport Beach, CA (Landscape
Architect)
Lampson Avenue Bike Gap Closure, Seal Beach, CA
(Landscape Architect)
0 Dale Street Complete Streets, Buena Park, CA
(Landscape Architect)
a Herondo Street/Harbor Drive Gateway Park and Cycle
Track, Redondo Beach, CA (Landscape Architect)
0 Santa Ana Canyon Road, Anaheim, CA (Landscape
Architect)
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 8

Subconsultants Profile
While 3taOt8Ccan handle most tasks utilizing our
extensive in-house resources, VVe have also
enlisted the support OfG8O-4dV8OtOC,Inc. A|\
for pavement engineering and BESST8Stl8b.Inc.
(BESS) for utility potholing.

MENEM
.111spection and Testing
Engineering Geologv
Founded iO2Ol2,GeO-AdV8DteC Inc. (GA|)i38n
engineering consultant that offers comprehensive
services in various areas of geotechnical
engineering, engineering geology, geotechnical
earthquake engineering, geotechnical pavement
engineering, geotechnical instrumentation, and
during construction services including materials
testing and special inspections. GAI possesses a
team of more than 20 registered civil and
geotechnical engineers, geologists, field and
laboratory technicians, and in-house special soil/
asphalt inspectors who have worked on a variety
of projects both nationwide and worldwide. The
GAI team has worked on locally and federally
funded projects and is very familiar with the
Greenbook Standard Plans and Specifications,
Highway Design standards in preparing
geotechnical reports for different phases of the
projects. Our project principals have supervised
complex and large transportation geotechnical
engineering projects, including PNED and PS&E
projects for LA Metro's Highway Program and
have a vast knowledge of Caltrans' regulations for
federally funded projects.

GA|iSaSmall Business Enterprise (SBE)Ce[tified
by multiple agencies including the State Of
California Department 0fGeneral Services (DGS).

Los Angeles County Metropolitan Transportation
Authority (LA Metr0), City 0fLos Angeles, County
0fLos Angeles, Port OfLos Angeles, Port OfLong
Be8Ch, K4e1[opO|itGD VVGte[ District OfSouthern
California, and the Los Angeles Unified School
District (LAU We are also registered with the
Department ofIndustrial Relations /D|R\
#1000017767
GA|owns @ full -service Laboratory accredited h»
multiple agencies, including C8lt[8Os.

TE�STLAB, IrAC.

BeSSTe3t|ab. Inc. is 8 privately —owned corporation
hBS8d out OfHayward, CA and has been in
operation since l967.Bess [email protected]. was
purchased h«Juan Jose BOhO[qUeZ,President, iO
March Oflgg5.Additional services have been
incorporated by Juan Jose Bohor| 1995
including: Ground Penetrating Radar, Vacuum
Excavation (potholing), Traffic Control and CCTV
Sewer Camera Inspection. These 3erViC8S
complement our already active Utility Location
Department. Bess TeStl8h'Inc. also strives tOhO
8tthe forefront 0finnovative techniques d is
pleased 10announce that VY2now offer Mobile
LiOARand U/Y/Drone services @Swell.

Bess TO3t|ah.Inc. provides Gcomplete range of
Subsurface Utility Engineering Services (SUE) to
both private and public companies thPOUghOUt
Northern and Southern California. VVeutilize
State'Of-theArt Electromagnetic and Acoustic
Pipe Locators BSwell aSour Ground Penetrating
Radar (GPR)systems tOdesignate underground
UtilitiesVVespecialize On"hard t0find" facilities
and blind searches. VVe learned that a
combination nfElectromagnetic, ACOUStiCGnd
Ground Penetrating Radar (GPR) technologies i5
the best approach tOsolve the most challenging
underground utility designating jobs. |naddition,
vY8use the Vacuum Excavation (potholing) to
expose underground utilities tOthe naked eye and
^ iti |y^ determine their actual depth and
physical conditions. We are devoted tOexcellence
and reliability in locating and marking
underground utilities, Our utility locating services
are always performed hytrained and experienced
professional technicians.
� Utility Locating State Ofthe Art
Electromagnetic pipe locators designate and
mark out utilities.
° CCTVPipe|nSpeCtiOn—VideO pipein3peCtiOn
provides more detailed information on
the internal condition 0fthe underground
facilities.
° Ground Penetrating Radar — Latest
techniques utilized iOthe location 0f
subsurface metallic and non-metallic objects.
° Potholing — Non-destructive air -vacuum
excavation exposes utilities being surveyed t0
determine their exact depth and |OC@tiOn
= Traffic Control Services
= S|SUtility Mapping Services/Mobile LiOAR/
UAVDr0neS
= MBE, DBE, SBE Certified
5 stantec City mfDowney | On -Call Consultant for Civil Engineering Services RRJNo: 23-002 | 9

Relevant Projects
����� ���
Telegraph Road Traffic Throughput and Safety Enhancements Projec,t Downey, California 2017-2022
Client Reference:

City ofDowney
Edwin Norris, Deputy Director ofPublic Works
(562)904f710
enoniu@dmwneyoa»rg
Construction Cost (Design Fee)
$6,380.000($287008)
Team Members:

K4ohammadHeiot
Jeff Wilkerson
Dave Lew
KeithRutherfbnd
SmgSeboum
Steve Cook
KotieK4cNguyon
Services Provided:

Design Survey
Traffic and Operation Analysis
Conceptual Design
Public Outreach Meetings
Roud/K4ed|un|mpnovemento
Pavement Rehabilitation
Parkway Improvements
ADACurb Ramp Improvements
Traffic Signal and Striping Design
Landscaping and Irrigation
Traffic Control Plans
U1i|ityCoondinaUon/Re|ooation
Bid and Construction Support
Our team provided preliminary and final design for roadway improvements along Telegraph Road between the Rio Hondo Channel and Lakewood Boulevard/Rosemead Boulevard (approximately 5,4O0feet) and between Pa000nuBou|evardandtheSanSabrie|River(appmximate|y3.3O0fcet).The project included improvements inboth the City ofDowney and the City of Pico Rivera. Coordination with both the cities of Downey and Pico Rivera, their utility providers, and stakeholders was crucial to make the project design and schedule run smoothly.

The project included new raised medians, roadway rehabi|Katim\ADA curb ramp improvements, parkway improvements, utility relocations, electrical improvements, traffic signal modifications, landscaping and irrigation improvements, and signing and striping improvements.

The traffic signal modifications included new poles, meters, and associated appurtenances otBirohbankAvenue and True Avenue. Both intersections were upgraded tovideo detection.

The landscaping and irrigation improvements included new hardscape, planting, and irrigation systems inthe new medians and along existing frontage roads.

The irrigation systems included new meters, boxes, back flow peven1em' associated appurtenances, and connections to new and existing electrical meters and circuits.
5 stantec City ufDowney | On -Call Consultant for Civil Engineering Services RFVNo: 23-O02 | 10

Lakewood Boulevard Improvements, P~ect Phase 3B & 3C
Downey, California
City ofDowney
Edwin Norris, Deputy Director ofPublic Works
(562)904-7710
enonio@)dmwneyceorg
Construction Cost (Design Fee)
$6,900'000($350.000)
Team Members:

MohammodHeiat
Jeff Wilkerson
KeithRNherfurd
GregSeboum
Dave Lew
Nahid Heidarbegi
Design Survey
Conceptual Design
Road/Median|mpmvemento
Pavement Rehabilitation
ADACurb Ramp Improvements
Drainage and Water Quality
Water System Design
Traffic Signal and Striping Design
Wall Design
Landscaping and Irrigation
Traffic Control Plans
UdU\yOoordinubon/Re|ooudon
Co|tranaPermitting
Bid and Construction Support
As -Built Plans
2011
2Dlg
Stantenprovided comprehensive professional services associated with the design and construction ofstreet improvements and enhancements along Lakewood Boulevard from Florence Avenue toTelegraph Road. The project was divided into two segments: Lakewood Boulevard between Florence Avenue and Gallatin Road (Phase 3B—Approx. 28OO1�and Lakewood Boulevard between Gallatin Road and Telegraph Road (Phase 3C—Approx. 27O0l The projects included construction ofnew raised medians and roadway widening toprovide athree continuous through lanes in each direction throughout the project limits. The Phase 3Csegment also included new bioowm|eand infiltration basin improvements and required uCaltnana Encroachment Permit through District 7.Other improvements required for implementation ofthe project include removal and reconstruction of concrete curb and gutter, new accessible curb ramps, driveway approaches and sidewu|ko, installation ofrecycled water mains, potable water meter adjustments, storm drain facilities, miscellaneous utility relocations and adjustments, masonry sound walls along the frontage roads, ornamental street and pedestrian lighting, landscaping and irrigation, traffic signal modifications, and striping, pavement markings, and aignugeimprovements. 5 stantec City mfDowney | On -Call Consultant for Civil Engineering Services RFONo: 23-O02 | 11

City of Downey Water Improvement Projects
Reference;
Lorena Powell, Senior Civil Engineer
(562) 904-7110
[email protected]
Paramount Boulevard Median
Water System Improvement Project
Downey, CA // 2015-2020
Pellet Street & Ryerson Avenue
Water System Improvement Project
Downey, CA // 2021-2023
6th Street Water System
Improvement Project (Western
Avenue to La Reina Avenue)
Downey, CA // 2022-2023
Stamps Road Water System
Improvement Project (Cherokee
Drive North)
Downey, CA // 2022-2023
75 U111i''i11V
Stantec prepared construction plans for installation of new potable water mains (plan only), improvements to existing water services/meters and fire hydrants, and the installation of new landscaping irrigation services for future medians.

These improvements were coordinated with future street
and landscaping improvements to avoid conflicts during
construction. Potholing was provided as part of this project, and an engineer's estimate was also prepared.

Stantec prepared construction plans (plan and profile) for the installation of new 8-inch DIP water mains along Pellet Street and Ryerson Avenue. The plans also included abandonments of existing mains, connections to the existing water system, and improvements to existing water appurtenances such
as meters, boxes, and fire hydrants. Potholing was provided as part of this project, and an engineer's estimate was also prepared.

Stantec prepared construction plans (plan and profile) for the installation of a new 8-inch DIP water main along 6th Street.

The plans also included abandonments of existing mains, connections to the existing water system, and improvements to existing water appurtenances such as meters, boxes, and fire hydrants. Potholing was provided as part of this project, and an engineer's estimate was also prepared.

Stantec prepared construction plans (plan and profile)
for the installation of a new 6-inch DIP water main along Stamps Road. The plans also included the abandonment
of existing main, a connection to the existing water system, and improvements to existing water appurtenances such
as meters, boxes, and fire hydrants. Potholing was provided as part of this project, and an engineer's estimate was also prepared.

Mohammad Heiat
Jeff Wilkerson
Greg Sebourn
Dave Lew
Mohammad Heiat
Jeff Wilkerson
Greg Sebourn
Dave Lew
Nahid Heidarbaghi
Mohammad Heiat
Jeff Wilkerson
Greg Sebourn
Dave Lew
Nahid Heidarbaghi
Jacob Lemmon
Mohammad Heiat
Jeff Wilkerson
Greg Sebourn
Dave Lew
Nahid Heidarbaghi
Jacob Lemmon
Stantec City of Downey !, On -Call Consultant for Civil Engineering Services RFQ No: 23-002 12

Jamboree Road Pavernent Rehabilitation and Reclaimed Water Conversion ProJect Newport Beach, California
20202023
Client Reference:

Our team provided preliminary and final design for roadway and reclaimed City ofNewport Beach
water improvements along Jamboree Road between Pacific Coast Highway Andy Tron.Senior Civil Engineer
andEaotb|uffRoad/FordRoad(appmximate|yD.5OOfeet).Thepnojedinc|uded (949)644-3315
median modifications, roadway resurfacing, roadway digouto.ADAcurb ramp [email protected]
improvements, parkway improvements, drainage improvements, reclaimed water system improvements, utility relocations, traffic signal modifications, Construction Cost (Design Fee)
landscaping and irrigation improvements, and signing and striping $4,000.000($360'000)
improvements including adding a striped buffer between the existing Class 11 Team Members:
bike lane and the vehicular traffic.

K4ohammadHeia<
The drainage system improvements included the construction ofonew drop Jeff Wilkerson
inlet inthe existing median and the removal and replacement ofexisting pipe Dave Lew
under Jamboree Road.

KeithRuihedund
8regSeboum
The reclaimed water system improvements were required toconvert the NahidHeidarbogi
existing median landscaping toreclaimed water. They included aplan and Jeff Dunn
profile of the new main south of Santa Barbara Drive, installation of associated Jim Cathcart
appurtenances such as air release valves, disconnection of existing irrigation Steve Cook
lines connected topotable water mains, and aconnection tothe existing KatieK4oNguyen
reclaimed water system atSanta Barbara Drive.

Services Provided:

Roud/Mediun|mpmvements
ADACurb Ramp Improvements
Drainage and Water System Design
Traffic Signal and Striping Design
Landscaping and Irrigation
iKi|kyCoordination/Re|ocation
Bid and Construction Support
As -Built Plans
5 stantec City mfDowney | On -Call Consultant for Civil Engineering Services RFONo: 23-O02 | 13

Lampson Avenue Bike Lees Improvements and Drainage Irnprovements Seal Beach, California 2020 - 2023
Client Reference:

Our team provided preliminary and final design for bicycle facility improvements City of Seal Beach
along Lampson Avenue between Seal Beach Boulevard and Basswood Street Iris Lee
(approximately 3,450 feet). The project included adding a Class I bike path Director of Public Works
and Class II bike lanes to connect the existing bicycle facilities at Seal Beach (562) 431-2527 ext. 1322
Boulevard to those at Basswood Street. To facilitate the addition of the Class [email protected]
II bike lanes, the project included median modifications, roadway widening, ADA curb ramp improvements, utility relocations, traffic signal modifications, Construction Cost (Design Fee)
landscaping improvements, and parking lot improvements. $2,800,000 ($248,000)
Since the source of funding was and an ATP grant, the project required the Team embers:
preparation of an E-76 Request for Authorization for Construction. Stantec to Jeff Wilkerson
the lead on preparation of this document, including coordinating several utility Mohammad Heiat
relocations (SCE, Charter, and Frontier), which were included in the Right of Way Keith Rutherfurd
Certification.

Dan Hayes
Dave Lew
Additionally, the improvements required a separate project for the construction Steve Cook
of a new catch basin and storm drain to correct drainage issues caused by the Katie McNguyen
405 Widening Project. These improvements were constructed in 2022 and the widening improvements are scheduled to begin construction later this year.

Services Provided:

Conceptual Design
Road Widening Improvements
Pavement Rehabilitation
Parking Lot Improvements
Drainage Improvements
Street Light Improvements
ADA Curb Ramp Improvements
Traffic Signal and Striping Design
Landscaping and Irrigation
Utility Coordination/Relocation
Federal Funding Documentation
Bid and Construction Support
Stantec City of Downey !, On -Call Consultant for Civil Engineering Services RFQ No: 23-002 14

Fee Schedule
We strongly believe that the measurement of
value is partially referenced from pricing, but
also from credentials and capabilities. Our
proposals are created with an understanding
of this balance. The typical design fee can
range 5% to 10% of the construction cost
based on the size, complexity, and specific
requirements of each individual project. We
have included a rate table for staff assigned
to the on -call services proposal. We also
understand that any rate change, after being
awarded, needs your written approval. If you
would like to see a full rate schedule for all
job classifications, one can be provided to
you upon request.

Hourly Billing
Staff Classification Rate
Senior Project/Task Manager 1 $250
Senior Project Engineer 1 $195
Senior Design Engineer 1 $172
Senior CADD Technician 1 $139
2-Man Survey Crew 1 $300
As requested in the RFQ, the table below shows Change Order Data for our five (5) recent public works projects in which all of the data was available.

Project Original
Bid
Final Description of Change Orders
Engineer's
Construction
Construction
Estimate
Cost Amount
Cost Amount
CIP No. 23-19 6th Street Water System $234,530
$253,960
$264,960 Additional water improvements
Improvements (City of Downey)
were added to the project by the
City,
CIP No. 23-21 Stamps Road Water $338,810
$319,400
$357,400 Additional water improvements
System Improvements (City of Downey)
were added to the project by the
City.

Newport Coast Drive and Balboa $5,181,564
$5,669,268
$5,964,031 City added work at other locations
Boulevard Pavement Rehabilitation (City
not included in the original scope.
of Newport Beach)
CIP No. 19-03 Pellet and Ryerson Avenue $614,800
$513,085
$572,285 Additional water improvements
Water System Improvements (City of
were added to the project by the
Downey)
City.

Jamboree Road Pavement Rehabilitation $4,740,135
#3,955,555
$4,350,178 City added extensive addition
and Reclaimed Water Conversion (City of
reclaimed water system
Newport Beach)
improvements and additional
landscaped improvements.

Additionally, there was an issue
during construction with an
inoperable water valve that needed
to be addressed.
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 15

Approach to Projects
lzyffjltl�. 11�4" • - 1141AA.�
You require a seasoned consultant to support your
upcoming task orders. We have the team,
experience, and community understanding to
achieve your objectives in a timely and cost effective
manner —through diligent project management,
effective teamwork, and state-of-the-art technical
skills. As an extension of your engineering staff, we
will perform all services in collaboration with you.

We will respond to your task orders promptly and
prepare and submit a detailed work plan, schedule,
and cost estimate. We will work closely with your
project manager to define and understand how to
meet your objectives. This includes selecting the
appropriate team members, using resources cost-
effectively, preparing a schedule with clear and
feasible milestones and deadlines, and offering a
fair and competitive budget. After you select us for
an assignment, we will meet with you to review and
confirm the scope of services, schedule, and fee
before proceeding.

During the project, we will explore value engineering
opportunities to reduce your costs. In addition, all
deliverables will undergo a thorough review by our
project manager, Jeff Wilkerson, and principal-in-
charge/contract manager Mohammad Heiat. Prior
to each submittal, our meticulous attention to detail
helps ensure that all deliverables from each design
discipline are well -coordinated. This is accomplished
by electronic file sharing, face-to-face coordination
meetings, and in-house QC reviews prior to
submitting each project progress phase
deliverables.
1 4
Through decades of experience, we thoroughly
understand the on -call process and have refined our
efforts to be the most beneficial for your task
orders.

The scope of work for any one task order may
involve all phases of project development. For most
general on -call engineering services requests, we
will prepare engineering design plans, reports,
specifications, and estimates (PS&E) for
construction.

PRELIMINARY ENGINEERING
We begin by identifying and addressing major
project design issues before work commences on
the final design and construction documents. To
initiate this phase, we meet with you to gain an
understanding of the project objectives, timing,
budget, and internal and external stakeholder
concerns and needs. We then perform research and
discovery to understand existing conditions,
development procedures, and criteria; and identify
opportunities and constraints. The utility
coordination process is also initialized. We then
review available plans and supporting documents
and prepare a report summarizing findings and
recommendations for the project design.

Conceptual plan alternatives, technical reports/
studies, and preliminary cost estimates are also
prepared as required. If necessary, we will hold
public community meetings to present the project
and describe its long-term benefits and temporary
impacts.

Typically, once a preferred alternative is selected, it will be developed into preliminary construction plans
(approximately 35-50% level). The conceptual
studies and plans developed during this phase are
used as the basis for the design development
drawings and documents. This phase is
instrumental in confirming design objectives,
highlighting project opportunities for cost savings,
and expediting the design and approval process.

FINAL ENGINEERING
Once we receive comments on the preliminary
construction plans, we further develop the final
construction documents. We typically produce PS&E
at the 90%, 100%, and final levels and submit them
for your review and submit to the appropriate
departments or other required agencies.

BID AND CONSTRUCTION SUPPORT
As projects are typically bid to contractors after the
final engineering phase is completed, we provide bid
support services as you require. Once the project
has been awarded, we will attend the pre -
construction and other on -site meetings, as needed.

We will review shop drawing and material
submittals, address the contractor's questions and
requests for information in writing, provide
construction survey staking services, and prepare
the final Record Drawings.
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 16

Project Workflow Diagrain for Civil Engineering Design Task Orders All engineering assignments will follow a systematic set of tasks, as illustrated in the following project workflow diagram, - Review existing data reports
- Site visit/field evaluation
- Topographic survey
Mapping base
Utility research
Geotechnical study
Environmental documents
Prepare traffic/drainage studies
Prepare alternatives
and concept plan
QA/QC review
Public
outreach
01 City responsibility
EStantec responsibility
- 35-50% plans
Respond to comments
- Engineer's opinion of probable
Final plans
construction costs (EOPCC)
Final EOPCC
- Outline specifications
Final specifications
m Draft SUSMP, SWPPP, and
Final SUSIMP, SWPPP, and
NPOES documents
NPDES documents
Utility coordination
Final utility coordination
QA/QC review
QA/QC review
Submittal to City and
Submittal to City and other
other agencies
agencies (final permits)
Preliminary Engineering Phase
. . . .... . ............................................................................. ............................................... .

City review
City
me
eting
City/Stantec responsibility
1:1 City/other agencies responsibility
City/other
City review
agencies
meeting
I
approval of
plans
M
Pre -bid meeting
- Pre-bid
to questions7
- Issue addenda
- - ------- — ---- - -------------------
Pre-construction meeting
Construction survey staking
Respond to RFIs
Review shop drawings
and submittals
Attend weekly
construction meetings
Project close-out/
record drawings
r................... . . . — - ----------- . ........ ........... . ..

Final Engineering Phase i Construction Support
Phase
................... L ................. . ........................ .. 5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 17

Work Plans for Specific
Services
Our experienced licensed personnel will perform the
types of anticipated projects presented in the RFP
The following are work plans for typical project
tasks.

BACKGROUND RESEARCH, DATA COLLECTION,

AND FIELD REVIEW
We will obtain available as -built record drawings,
right-of-way maps, and other pertinent information
from you, the County of Los Angeles, and Caltrans,
as appropriate. We will visit the site and conduct a
project site inventory to verify and supplement the
available as -built drawings, evaluate non -compliant
Americans with Disabilities Act (ADA) access
improvements, identify visible asphalt and concrete
deficiencies, and confirm the scope of work
identified in the task order.

DESIGN SURVEY
Our in-house surveyors will perform surveying
services to prepare the existing topographic, utility
and right-of-way base maps within the project limits.

We can also provide an aerial topographic survey
and a color digital ortho-photo if required for each
project.

GEOTECHNICAL INVESTIGA F'10N AND

PAVEMENT ENGINEERING
We will perform subsurface explorations, soil
testing, and data analyses of the existing site and
provide design parameters, as needed. We will use
this information to prepare a report of our findings
and provide recommendations for pavement
replacement and rehabilitation options. We will work
with you to choose an economical pavement design
section to meet your budget objectives. We can also
investigate "green" opportunities to use recycled
content materials or salvaged materials reuse and
provide percolation tests, if needed.

ENVIRONMENTAL DOCUMENTS AND PERMIT

COMPLIANCE
If required, will prepare environmental documents,
which typically include either a Categorical
Exemption (CE) or MND pursuant to CEQA
guidelines to evaluate potential environmental
impacts. Supporting documents and studies will be
prepared as required, and we will submit this
document on your behalf to the necessary agencies.

UTILITY RESEARCH AND COORDINATION
We will provide full -service utility coordination,
including utility research (potholing if required),
determining ownership rights, submitting utility
information requests, reviewing and noting utility
conflicts, securing utility permits, and coordinating
any required utility relocations and adjustments.

TRAFFIC STUDIES AND OPERATIONAL

ANALYSIS
We have vast experience preparing traffic studies
and operations analysis reports. Our approach to the
wide variety of traffic studies and analysis is to
conduct thorough background research, data
collection, analysis, findings, conclusions, and
recommendations documentation for each project.

We have a suite of state-of-the-art traffic analysis
software for level of service analysis for traffic
impact studies, traffic simulation analysis, and
traffic signal timing/coordination, including VISSIM,
Vistro, TransModeler, and Synch ro/Si mTraffic. Our
analysis tools also include AutoTurn and several
traffic tools for intersection capacity utilization and queuing analysis.

DRAINAGE AND WATER QUALi I Y DOCUMENTS
We will prepare preliminary and final hydraulic/
hydrology analyses and reports and storm drain
improvement plans, which will be incorporated into
the project plan set.

We coordinate closely with you and your
maintenance staff for the National Pollutant
Discharge Elimination System compliance and to
identify Best Management Practices (BMP) that are
acceptable to you. Our coordination includes
reviewing specific cost and maintenance
requirements for proposed BMPs. We then prepare
a Standard Urban Stormwater Mitigation Plan
(SUSMP) that details water quality considerations
and requirements. We implement BMPs that are
consistent with Low Impact Development (LID)
guidelines, as well as the Green Streets guidelines
as issued by the US EPA.

These types of improvements include options, such
as bioswales with gravel storage, dry well inlets, bic, retention areas, and/or infiltration areas that will
passively collect and treat storm water runoff to the
maximum extent practicable. If required, we will
prepare Storm Water Pollution Prevention Plans
(SWPPP).

CONCEPT PLAN
We will prepare a concept plan based on the traffic
study recommendations. The concept plan will
depict the proposed geometric roadway
improvements and conceptual landscaping and will
accommodate all sight distance and design vehicle
requirements. The existing and proposed right-of-
way will be shown and any required right-of-way
acquisition will be indicated. We will accompany the
concept plan with a preliminary cost estimate so
you can review the cost of the project versus the
project budget to determine if any value engineering
revisions are further needed.
(3 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 18

ALTERNATWES AND VALUE ENGINEERING
We will provide value engineering analysis and
identify design and construction alternatives that
may be employed to reduce project costs and
minimize conflicts between the proposed
improvements, existing site improvements, and
utilities.

PUBUIC OUTREACH
We will provide the necessary services to schedule
and conduct public community meetings to present
the project. Our team will work with community
groups and present informational materials in the
public forums (e.g., workshops, public hearings) to
provide a clear project description, as well as its
temporary impacts and long-term benefits.

RIG11'r-OF-WAY ENGINEERING
When right-of-way, permanent easements, or
temporary construction easements need to be
obtained due to roadway widening or other
proposed improvements, we will prepare legal
descriptions and exhibits to identify the right of way
and easement areas required for project
construction. These exhibits show existing property
lines and all required right of way and easement
areas. We provide traverse calculations and tie
distances for acquisition areas that cannot be
readily tied to a survey or construction centerline.

We can also provide preliminary title reports as part
of this task. If necessary, right-of-way acquisition
services can be provided by a specialty
subconsultant to augment our team.

AZn1SF1M=F

ROADWAY IMPROVEMENT PLAN PREPARATION
Roadway improvements will be designed in
accordance with the latest City and Caltrans
requirements. The plans will depict all roadway
improvements required to implement the approved
concept plan or scope of work. Pavement
improvements and rehabilitation will be based on
the geotechnical report and the plans will address
any offsite improvements required. Design cross
sections are also prepared using Civil 3D to confirm
the roadway geometrics. We will upgrade any ADA
non -compliant improvements, such as curb ramps
and repair any damaged improvements, such as
broken sidewalk or curbs.

SIGNING AND STRIPING PLAN PREPARATION
We will adhere to your design criteria and
requirements and conduct thorough research of
existing conditions. During our field review, we will
verify improvements shown on record drawings and
identify noteworthy features, such as existing signs,
posted speed limits, existing lane widths, and
transition tapers. Signing and striping improvements
are designed in accordance with the latest California
Manual on Uniform Traffic Control Devices (CA
MUTCD). If necessary, existing signs may be
replaced or supplemented with new signs to meet
current standards.
'TRAFFIC SIGNAL PLAN PREPARATION
During our field review, we will thoroughly research
existing conditions, including documenting existing
utilities and design constraints near the existing
traffic signals. Identifying and resolving potential
utility conflicts early and coordinating with utility
agencies for new electrical services are a critical
component of managing these projects and we
stress timely and well documented
communications. Traffic signal improvements will
be designed in compliance with the latest CA
MUTCD and some intersections may be upgraded to
video detection as required.

TRAFFIC CONTROL PLAN PREPARATION
We will identify construction staging that allows
efficient construction of the improvements, while
providing a safe work zone for construction
personnel that minimizes impacts to motorists and
adjacent properties.

The success of projects is often judged from a
public/stakeholder perspective as a function of the
impacts associated with the project construction
phase. We keep this in mind throughout developing
traffic control/ construction staging plans. Our
traffic control plans show all traffic control
measures required to implement each construction
phase, including all traffic control devices, temporary lane delineation, and construction signing. Our traffic control plans follow the CA MUTCD Manual and
Work Area Traffic Control Handbook latest editions.

S11"RREET AND PEDTRIAN LIGHTING PLAN

PEPARKI-ION ES
The existing street lights and pedestrian lights within project limits may require relocation to
accommodate proposed street improvements, and/
or additional street or pedestrian lights may be
needed to satisfy your requirements for adequate
lighting. In that case, we will determine the required
"luminaire" additions, relocations, conduit, wiring,
metering, and verify all service points of connection
with the electrical company. These design details
are added to the roadway plans in accordance with
your lighting standards.

LANDSCAPE AND IRRIGATION IMPROVEMENTS
We will prepare preliminary and final planting and
irrigation plans indicating the planting theme and
layout intent, plant legend with plant species and
sizes, irrigation point of connection, legend, and
methods of irrigation application. We will create a
sustainable design by using indigenous and drought
resistant materials, where appropriate. The irrigation
system typically includes a low -volume delivery
I:$ stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 19

system designed to prevent water from leaving the
target site while supplying the proper amount for the
optimum plant health.

WATER, STORM DRAIN, AND SEWER PLAN

IMPROVEMENTS
Typical water improvement include the installation
of new ductile iron pipe (DIP) water mains, water
services, meters, boxes, valves, combination air
release and vacuum valve assemblies, blow -off
assemblies, and fire hydrant assemblies. Storm
drain and sewer facilities may also be provided,
replaced, or adjusted as part of stand-alone projects
or due to pavement rehabilitation or roadway
widening improvements. Our plans will conform to
your strict design and drafting standards. We will
prepare accurate utility base maps that are
consistent with surface utilities which we field verify.

Potential utility alignment and construction method
opportunities are thoroughly and effectively
investigated. Key alignment constraints and
considerations that are investigated include the
following: proposed connections to the existing
facilities- utility conflicts and depths of crossings;
options for trenchless construction methods"
California Department of Public Health (CDPH)
separation criteria; potential impacts to adjacent
pipeline trenches, traffic impacts, driveway access
and other impacts to the community and other
activities in the project areas,- construction costs"
and construction schedule constraints and
durations.

SPECIFICATIONS PREPARATION
We will prepare the project specifications based on
your supplied boilerplate that references the latest
adopted version of the Standard Specifications for
Public Works Construction (SSPWC), "Greenbook."
Our experienced staff will thoroughly review and
modify your standard boilerplate and provide
additional information or revisions to all relevant
sections of the SSPWC to help ensure that the
special provisions do not conflict with the
improvement plans and convey the design intent of
our engineers.

ENGINEER'S OPINION OF PROBABLE COST

ESTIMATE
We will first determine the Bid Schedule required
based on a thorough review of the plans and project
specifications. Quantities for these items will be
calculated and tracked using our custom software
and their unit costs will be determined based on
recent bids from local contractors. The cost
estimate will be provided with all submittals to
provide you with accurate costs throughout the
design.
masom
If permit or approval of plans from other agencies,
such as Caltrans, utility companies, or transit and
regulatory agencies are required, we will help you
prepare and process agreements through these
agencies.

BID SUPPORT SERVICES
We will assist you during the bid phase by attending the pre -bid conference and job walk, responding to requests for clarifications from prospective bidders, and issuing addenda to the bid package as necessary. We can also
tabulate and verify bids using a spreadsheet and analyze bid results to recommend and award or reject bids.

CONSTRUCTION SUPPOR"I'SERVICES
We will attend the pre -construction conference and
interpret and clarify the approved construction
documents for project design, design intent, and
implementation. We also provide construction
support to respond to contractor requests for
information (RFI), and review shop drawings and
material submittals to make sure they conform the
project bid documents. Construction survey staking
services can also be provided.

AS -BUILT PLAN PREPARATION
After construction is complete, we prepare as -built
plans based on information provided by the
contractor and/or inspector. We anticipate that this
information is provided as a set of project plans red
lined to indicate the changes that were made during
project construction,
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 20

PROJECT CONTROL
With our comprehensive quality program, we deliver
services that have been through a detailed review,
thereby limiting errors and omissions to provide you
with high -quality products. We believe that quality
starts from the beginning of the project. Our project
managers follow a process— Project Management
(PM) Framework —on every project.

This 10 step process begins with the proposal and
concludes with final project closeout. While the
project manager is responsible for executing this
process, every team member understands and
contributes to the various steps. This system
promotes continuous improvement in our
communication and construction documents. As an
ISO90012008 registered firm, our projects and
employees regularly undergo audits of our projects
and processes. These audits assess our compliance
with Integrated Management System requirements,
evaluate the effectiveness of our PM Framework
procedures, and identify opportunities to "improve
our processes and procedures. As a result of these
audits, we maintain thorough record keeping and
transparency throughout the project. Quality control
is a key step in the PM Framework process; however,
it is the entire process that provides the client a
quality deliverables and service.

Our methodology to monitor and control projects
follows.

The PM Frameworks is organized into four major
phases of work —initiate, plan, control, and closeout.

It identifies 10 primary activities that must occur on
each project. Many activities occur on a regular
basis throughout the project to properly manage
budget and schedule, as well as to verify the quality
of the construction documents meet industry
standards and client expectations. Additional points
beyond the 10 primary activities are added as
needed to address the unique elements associated
with individual projects.

Although all the activities are important for a
successful project, a few of the activities worth
highlighting are points 2, 5, and 8.

Point 2 - We prepare a project implementation plan
for each project, including a Quality Management
Plan (QMP). Mohammad will verify that all team
members are aware of the QMP and committed to
its direction. He will also provide other related
documents that outline project and client specific
requirements and encourage their use through
ongoing discussion and quality reviews/audits.

Prepare a proposal that includes a preliminary Project Plan including scope, project budget, resources, deliverables, and schedule. Conduct and document an independent review of the final proposal. Conduct and document a hazard assessment and apply applicable controls if a field or site visit is required during the proposal phase.

Obtain written instructions to proceed and execute an approved contract. Obtain written subconsultant agreements (if applicable).
............ -----------
Prepare a Project Plan to an appropriate level of detail. Conduct and document an independent review.

Establish hard copy and electronic project record directories and file project records accordingly. -- -- --------
Complete a Health, Safety and Environment risk management assessment and documentation for all projects involving fieldwork.
- - - - - - --- ------ - - ---------------------------------------------------------------------- ---------------------- ----------------------- - - - ------------ --------- - ----------- --------- - - -------------------------------------------------------------------------- - - --------------------------------------------------------------------- - ----------------------------- ---------------------------------- -------- -- -- -- -- ------------------------- Monitor the PM Dashboard on a regular basis. Follow best practices for managing project financials, including time charges, work in progress (WIP), accounts receivable (AR), and estimates to complete (ETC).

Obtain the client's written approval on scope of service changes in a timely manner.

Conduct and document a quality review of all final* deliverables prior to issue.

Conduct and document an independent review of all final* deliverables prior to issue. • Close off the project financials and close out the project files. *Final: A final deliverable is defined as any record (written or graphic) based on professional expertise or judgment that is intended to be relied only by others and that provides direction to others as part of a service to the public (e.g., professional reports, documentation issued for construction, permit submissions, and maps). 5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 21

Point 5 - We use a fully integrated, Oracle based
accounting system that includes electronic
timesheet submittal, billing, accounts receivable,
accounts payable, and financial statements. All
accounting procedures require appropriate fiscal
authority, and are subject to Sarbanes-Oxley
controls and US Generally Accepted Accounting
Practices (GAAP). The project level financial
information is made readily available on
Mohammad's desktop. Our Enterprise system —the
PM Dashboard —tracks the project budget at the
work labor breakdown structure level, and provides
updated information to Mohammad. Mohammad
will review the project budget weekly to confirm the
appropriate charges are hitting the project.

Point 8 - We encourage using checklists to assist in
the reviews and provide review documentation.

Mohammad will designate appropriate team
members from each discipline to carry out internal
QA reviews. The reviews will be preformed by an
individual knowledgeable of the technical
requirements, but have not been directly involved in
preparing the materials for that activity. The
individual reviews that the QC process has been
completed as evidenced by finalized and signed -off
checklists, as well as appropriate review comment
forms. The internal reviews will occur prior to major
milestone submittal to minimize your review
comments.

Another critical component is assigning the
appropriate and available team members to address
your unique project elements. With an on -call
project, it is uncertain when a project will become
available and what the specific project needs will be.

As such, we have identified our key staff and
support,- however, we will utilize our deep bench and
extensive resources available to supplement this
team as the need arises.

Our intranet system, StanNet, also provides a broad
range of information —from general news to specific
and up-to-date project and contact information. We
understand that communication is critical, and our
staff, quality management system, and customized
tools are available to facilitate the communication
process. Our overall QA/QC manager, Mohammad,
will review the initial project scope and schedule to
customize the project's QA/QC program.

To maintain schedule, we:
* Obtain a strong understanding of the required
project tasks and processes
* Commit the appropriate number of qualified and
available staff
* Prepare a thorough and realistic project
schedule
* Monitor the project schedule on a regular basis
* Make corrective adjustments to the work
process
* Communicate often and early with you
Project manager Jeff will utilize the project schedule
to identify and proactively plan upcoming activities,
and to monitor the work progress. He will confirm
critical information is flowing as needed to maintain
the project schedule and will develop alternative
work plans, if needed, to maintain schedule.

In the event that a project is delayed, we
immediately draw upon our extensive pool of
resources company wide to bring the project back
on schedule. Mohammad and Jeff will meet with
other task managers within Stantec to establish a
strategy to complete the project by a date agreed by
you. We will then prepare a detailed schedule to
share with you and the other team members.

Below are additional controls and processes which
help us consistently deliver exceptional projects on
schedule and within budget.
commi rMENT TO ACHIEVING RESULTS
The goal of all our technical and management
efforts are reducing time and cost to our clients. We
pride ourselves on achieving results. We manage
our projects to develop accurate, high -quality
deliverables that meet or exceed your expectations,
while minimizing schedule and costs.

SELECTION OF PROJECT PERSONNEL
We tailor our project team based on the project type.

This management strategy accelerates work,
improves efficiency, shortens schedules, and avoids
costly rework. In keeping with our multi -disciplinary
approach, we also include the needs and
perspectives of the technical personnel from the
project inception.

PROJECT PLAN
We prepare project plans for every project that
includes the scope of work, deliverables, schedules,
and individuals responsible for delivery. All staff
participate in an internal kick-off meeting where the
project and client goals, constraints, challenges,
proposed solutions, and the project plan are
reviewed and finalized.
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 22

REGULAR CLIENT COMMUNICATION
Effective and sustained communication is vital to
effective management and work execution. In
addition to regular day-to-day telephone and email
communication, we conduct weekly conference
calls, progress review meetings, monthly progress
reports, and quarterly financial review meetings, to
help ensure you're consistently informed of the
project status.

SCHEDULE CONTROL
The controls and project management tools
employed are the first step to ensuring a project is
delivered on time and on budget. This and constant,
open dialogue between the project manager and
design staff ensure the project is moving along the
intended direction.

SCHEDULING SOFTWARE
Our project managers utilize the project schedule to
identify and proactively plan upcoming activities,
and to monitor the progress of work. We utilize a MS
Project Gantt chart format schedule working with
the client to confirm critical information is flowing as needed to maintain the project schedule. We
understand that schedule management and control
is an ongoing process that involves the entire project
team. Time of completion affects the project cost —
saving time, or performing the project at the
appropriate pace, can lower project costs to the
client and increase customer satisfaction.

ADDITIONAL, SOFTWARE PROGRAMS
We hold an enviable record, both for managing and
innovating technology. Our professionals use
state-of-the-art tools to perform and manage design
projects. Our projects are organized around a team
concept, where all members have access to a
common set of project data and software. Our
computer capabilities are employed to produce
information customized for the individual needs of
our clients and their projects,in differing formats.

Our documents are produced on PC- based
systems, and some of the softwares we use include:
* AutoCAD/Civil 3D
* AutoTURN
0 Microsoft Office (Word, Excel, and Outlook)
0 Synch ro/Simtraff ic
0 Vistro
& Highway Capacity Software
UNIQUE ATTRIBUTES OR MS"T"INGUISHING

CHARACTERISTICS
The Stantec team is very familiar with Downey's
streets and water system, as well as, your design
standards. We also have similar experience and
familiarity with nearby agencies such as Los
Angeles County, Metro, and Caltrans. Having worked
on multiple City street and water improvement
project for over a decade, this intimate familiarity
and knowledge provides valuable insight when
developing project scoping and budgets to complete
task orders.
5 stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 23

References
Satisfied and repeat clients are the strongest testament to a Well -managed project. We encourage you to reach out to the contacts listed below as part of your selection process.

Contact Name,
Address,
Agency/
Phone Number,
Staff Worked
Firm Name
E-mail Address
Services Provided
on Projects
City of Downey
Edwin Norris
&
Telegraph Road Traffic Throughput and Safety
Mohammad Heiat
Deputy Director of Public Works
Enhancements Project
Jeff Wilkerson
11111 Brookshire Avenue
&
Lakewood Boulevard Improvements, 3B & 3C
Dave Lew
Downey, CA 90241
0 Paramount Boulevard Median Island Improvements
Keith Rutherfurd
(562) 904-7110
0 Lakewood/Rosemead Boulevard and Telegraph Road
Josh Park
[email protected]
Intersection Improvements
Greg Sebourn
Steve Cook
Lorena Powell
&
Paramount Boulevard Median Water System
Mohammad Heiat
Senior Civil Engineer
Improvement Project
Jeff Wilkerson
11111 Brookshire Avenue
&
Pellet Street & Ryerson Avenue Water System
Dave Lew
Downey, CA 90241
Improvement Project
Jacob Lemmon
(562) 904-7110
&
6th Street Water System Improvement Project (Western
Greg Sebourn
[email protected]
Avenue to La Reina Avenue)
Stamps Road Water System Improvement Project
(Cherokee Drive North)
County of Los
Pat Smith
Las Tunas Avenue TSSP
Mohammad Heiat
Angeles
Associate Civil Engineer
Rosecrans Boulevard TSSP
Keith Rutherfurd
900 South Fremont Avenue
El Segundo TSSP
Josh Park
Alhambra, CA 91803
Prairie Avenue TSSP
(714) 822-7370
Aviation Boulevard TSSP
[email protected]
City of Newport
Andy Tran
Newport Boulevard Widening Improvements
Mohammad Heiat
Beach
Senior Civil Engineer
Irvine Avenue Pavement Rehabilitation Project
Jeff Wilkerson
100 Civic Center Drive Newport
6 West Coast Highway and Superior Avenue/Balboa
Dave Lew
Beach, CA 92660 (949) 644-3315
Boulevard Intersection Concept Plan
Keith Rutherfurd
[email protected]
0 Jamboree Road Widening Improvements
Greg Sebourn
City of Mission
Richard Schlesinger
6 Oso Parkway Roadway Widening Improvements
Mohammad Heiat
Viejo
Deputy Director/City Engineer
6 Oso Parkway at 1-5 On -Ramps
Jeff Wilkerson
200 Civic Center
Dave Lew
Mission Viejo CA 92619
Keith Rutherfurd
(949) 470-3079
Josh Park
[email protected]
Dan Hayes
Greg Sebourn
Steve Cook
City of Seal
Iris Lee
Lampson Avenue Bike Lane Closure
Mohammad Heiat
Beach
Director of Public Works/ City
Jeff Wilkerson
Engineer
Dave Lew
211 Eight Street
Keith Rutherfurd
Seal Beach, California 90740
Josh Park
(562) 431-2527 ext.1322
Dan Hayes
[email protected]
Greg Sebourn
Steve Cook
Stantec City of Downey On -Call Consultant for Civil Engineering Services RFQ No: 23-002 24

100 Civic Center Drive
Newport Beach, California 92660
949 644-3311 1 949 644-3308 FAX
t)ewportbeactica.gov/publicwoi-ks
Subject: Letter of Reference and Recommendation for Stantec Consulting Services, Inc.

I am pleased to provide this letter of reference and recommendation for Stantec Consulting Services, Inc. who has provided the City of Newport Beach with excellent professional engineering services. These services include preparing final construction plans, specifications, and cost estimates as well as providing construction support.

It has been a pleasure working with Stantec's project manager, Jeff Wilkerson, on various roadway improvement projects. Jeff is very attentive to details and is mindful of project budget and schedule constraints. Because of his strong management skills with his staff and subconsultants, Jeff has successfully completed several challenging roadway design projects on time and within budget. Stantec recently completed the City's Jamboree Road Pavement Rehabilitation and Reclaimed Water Conversion project and the Balboa Boulevard and Newport Coast Drive Pavement Rehabation project. The combined valuation of these two projects was approximately ten million dollars. In addition, Stantec is currently preparing engineering plans, specifications, and cost estimates for the East Coast Highway and San Miguel Drive Pavement Rehabilitation project. I have personally worked closely with Jeff in the past 15 years and have been very pleased with his performance and professionalism. 5milluslat MM�101109911101
Sincerely,
Andy Tran, P.E.

Senior Civil Engineer

Brian Goodell
ity
• • • •
Mayor
Trish Kelley
Mayor Pro Tem
mom
Wendy Bucknuin
Public Works Department
Councilmember
Bob Ruescb
Councilmember
Cynthia Vasquez
Councilmember
October 10, 2023
Subject: Letter of Reference and Recommendation - Stantec Consulting Services Inc.

Dear Sir/Madam:

I am pleased to provide this letter of recommendation for engineering and design services by Stantec Consulting Services Inc. Stantec's team, consisting of Mohammad Heiat, Jeff Wilkerson and Keith Rutherfurd, has an extensive amount of experience and leadership necessary to perform engineering services on public work projects of any size and magnitude.

Stantec Consulting has performed numerous traffic and roadway improvement design projects for the City of Mission Viejo over the past twenty years and delivered high quality construction plans. Their highly -qualified staff has consistently demonstrated the ability to work well with integrating multiple disciplines, jurisdictions, and resource agencies necessary in completing a project. They work in the City's best interest by completing projects on time while also being mindful of budgetary constraints. It is a pleasure working with Stantec Consulting Services Inc and I would recommend the firm without reservation.

I would be happy to discuss my experiences working with Stantec in more detail, if needed. Do not hesitate to contact me at (949) 470-3079 or via email at rschlesinger(kcityofmissionviejo.org.

Sincerely,
Richard Schlesinger, PE
Deputy Director/City Engineer
City of Mission Viejo
200 Civic Center • Mission Viejo, California 92691 949/470-3056 http://www.cityofmissionviejo.org 04

INSURANCE
3t8OteCholds insurance C0vehD [0fei l
liability, general liability, and workers compensation
as required in the City's request for qualifications.

This documentation has been provided to the City
for past contracts and updated information can be
provided prior to execution of this and future
COOt[GCtS.

LITIGATION
There are D0unsatisfied judgments Orarbitration
awards outstanding ag8iOStStGDteC. St@OteCd0eS
have some legal proceedings, lawsuits, 0[claims
pendiDciThese are Gnormal part Ofprofessional
services industries. All have been reported t0
StGOteC'sinsurers who are iOthe process 0f
adjusting/managing themNone will have 8material
effect ODthe financial position Dfthe company OritS
ability undertake this 0D-C8|| Perhaps 0fgreater
comfort t0our clients iSthe fact th8tSt@nteC seeks
tOdeal with client concerns and claims promptly
and fair through our Risk Management g[OUp.ASG
public company, 3t@OteChas substantial assets and
maintains high pn3feSSiODGl liability insurance
limit. 3taOteC'sclaims history has resulted in
relatively low insurance premiums when compared
with firn05 0fsimilar size and Ch8[GCte[

CONTRACT REVISIONS
We have reviewed your proposed RFP/contract
terms and believe that should we be selected for
this assignment, we will be able to conclude a
mutually satisfactory contract with you. Our legal
team did have some revisions which are presented
General Indemnification. Except as provided in
subdivision 3.5.6.2 below which is applica8ble to
"design professionals" only, Consultant shall defend
(with counsel acceptable to City), indemnify and
hold the City, its officials, officers, employees,
volunteers and agents free and harmless from any
and all claims, demands, causes of action, costs,
expenses, liability, loss, damage or injury, in law or
equity, to property or persons, including wrongful
Wit It
and -reasonable attomeys'fees and other related
costs and expenses. The-G���
(3stantec City cfDowney | On -Call Consultant for Civil Engineering Services RF0No: 23-O02 | 27

Design with
community in minol

O

N

TETRA TECH
October 13, 2023
Matthew Baumgardner, PE, Director of Public Works/City Engineer City of Downey
11111 Brookshire Ave.

Downey, CA 90241
Reference: Statement of Qualifications for On -Call Civil Engineering Services, RFQ No. 23-002 Dear Mr. Baumgardner,
Thank you for the opportunity to submit our Statement of Qualifications for On -Call Civil Engineering Services. Tetra Tech appreciates the relationship that has been built with the City of Downey (City) during our past projects and looks forward to continuing and expanding this association in the future. We have an outstanding team, which combines the experience, depth, and understanding needed for the successful delivery of this contract. Our project team brings the following distinct advantages to the City:
5o Extensive City WaterMastewater Design Experience. Members of our project team have completed more than 18 water/wastewater projects for the City since 2018. Our project team knows the City's design requirements and standards, preferred materials, and operational preferences which will allow us to complete designs in the most cost-effective manner.

Extensive On -Call Engineering Services Experience. Tetra Tech has been providing similar on -call engineering services for over 35 clients in Southern California. Many of these are repeat clients as we have provided service and solutions on -time and within budget. ioExtensive Design Experience. For over 15 years, members of our project team have been involved in the design of more than 325 miles of water, recycled water, and sewer mains, 60 reservoirs, 40 water/recycled water pump stations, 15 water wells, 12 flow control facilities and 8 lift stations. ioPFAS Design Experience. We are one of only a few firms that have completed the design of six PFAS projects, including the first operating project in Orange County and the largest PFAS Ion Exchange project in the United States.
ioDedication to City. We believe our relationship with the City shows our commitment to providing the City with high -quality service. We have been awarded repeat work with the City due to our quality and responsiveness as well as the trust formed with the City's Engineers.

We assure you the expertise, responsiveness, attention to detail, and commitment demonstrated on our previous work will be fully applied to this contract. I certify that I have the authority to make legally binding commitments on behalf of Tetra Tech. Should you have any questions regarding our submittal, please feel free to contact me at 949/809- 156 or via email at [email protected].

Sinc ely,
Tom Epper o PE
Vice President
i 135,5 Vora Karman Avenue, Suite 500, Irvine, CA 526165227 Tel 949, 09,5000 tetratech.com

FIRMOVERVIEW ...........................................................................................................................................1 APPROACH.......>.>......................®......................................................................®........................®...................2 SAMPLEPROJECT APPROACH.........................................................................................................................

MeetingProject Schedule.......................................................................................................................................3 ResolvingKey Issues................................................................................................................................................3 PROJECT MANAGEMENT POLICIES AND PROCEDURE .............................. .............. —.....................................4 Planningthe Project................................................................................................................................................5 ProjectManagement..............................................................................................................................................5 Communications.....................................................................................................................................................5 ScheduleControl.....................................................................................................................................................6 CostControl............................................................................................................................................................6 RiskManagement Approach...................................................................................................................................6 ResourceManagement...........................................................................................................................................6 Quality Assurance/Quality Control.........................................................................................................................6 TASK ORDER APPROACH................................................................................................................................7 ON -CALL ENGINEERING EXPERIENCE...............................................................................................................

CIVIL ENGINEERING EXPERIENCE....................................................................................................................9 Water/Wastewater Experience..............................................................................................................................9 Street Improvement Experience.............................................................................................................................9 Strom Drain/Hydraulic and Hydrology Reports/Design....................................................................................... 10 Traffic/Striping Improvements............................................................................................................................ 10 PavementDesign................................................................................................................................................. 10 PFAS TREATMENT EXPERIENCE.....................................................................................................................11 RELEVANT PROJECT EXPERIENCE..................................................................................................................1 PROJECTTEA............................................................................................................................................17 REFERENCES................................................................................................................................................27 TETRAPage I i

On-CaH Civil Engineering Services I RFC? 412.3-0e3
Based in Pasadena, California, Tetra Tech is a full -service engineering and science firm with a substantial global presence.

We help our clients conceptualize and execute innovative solutions to their most difficult problems. From front-end science and planning to design, construction management and operations, Tetra Tech's global service network, facilitated by our initiatives program coordinates resources for specific markets and provides best in -class experts with worldwide project experience.

Tetra Tech is a Delaware Corporation (publicly traded) and has been in business for over 50 years. Founded in 1966, Tetra Tech is a nationally recognized engineering and resource management firm of more than 27,000 engineers, scientists, construction specialists, and technical support personnel in 550 offices worldwide. Listed on the NASDAQ Exchange (TTEK), Tetra Tech's annual revenues now exceed $4.5 billion (2023). Thus, we are in an excellent financial position and can provide the necessary resources to rapidly deploy and meet aggressive project schedules.

Tetra Tech consistently ranks among the top engineering firms annually according to the Engineering News -Record. In 2023, Tetra Tech was ranked 4th among the top 500 design firms nationwide and was ranked #2 in the Sewer & Waste service industry.

Tetra Tech's objective is to provide the necessary expertise and resources to deliver projects on time, within budget, and in compliance with the design and construction standards of our clients and approval agencies. Our more than 30 years of experience in water resources management is directly associated with municipal water, wastewater, recycled water, and stormwater facilities encompassing collection and distribution pipelines, pumping stations, storage reservoirs/tanks, treatment and reclamation plants, and disposal systems. Over the years, we have gained the confidence of our clients by meeting the expectations and performance goals of both clients and regulatory agencies.

Client -Focused Service
Our goal is to provide the necessary expertise and resources to deliver the project on time, within budget, and in compliance with the design and construction standards set by the City and approval agencies. Leveraging our national presence, multi -disciplinary team, and client focused service, we apply lessons learned from our vast experience to each and every challenge. Clients benefit from this approach by receiving consistently high -quality service, innovative designs, and functional solutions that are responsive to their needs and often exceed their expectations. We understand that our success is measured by our ability to listen to and collaborate with our clients. A cornerstone of our success is our client -focused service, staff qualifications, firm commitment, and desire to successfully complete each assignment to the satisfaction of all clients. It is our goal to exceed our clients' expectations through hard work and attention to detail to achieve professional excellence.

TETRAH Page j I

On-CaH Civil Engineering Services I RFC? 412.3-002
Our basic approach to engineering support services will be to provide the City with an experienced,
knowledgeable, and enthusiastic staff dedicated to
providing the level of service the City desires. Tetra Tech is committing our top project manager and most
experienced project engineers to this contract to ensure that this is accomplished. Our Team will be able to
recognize and anticipate problems and be able to come
Our extensive experience with similar projects will
ensure that the City will receive a high level of service delivered by qualified, knowledgeable engineering
professionals. Highly meticulous and coherent plans and specifications greatly benefit all project stakeholders, with the largest benefit realized by the Owner. Quality contract documents clearly lead to a larger number of
bidders, lower competitive bid prices (due to increased competition, the contractor has less to assume and take the risk for, and a greater overall comfort level in our design based on a long history of successful projects), and lowest overall cost while achieving a very high -
quality end product (quality contract documents mitigate the potential, and impact of change orders, and sets
forth a standard of quality the contract must achieve).

No two projects are the same, although many are similar The key is to utilize elements of work that have been
successful and can be appropriately applied to your
projects, continue to improve construction efficiencies without lowering quality based on contractor feedback,
and maximize the overall operational flexibility.

We feel our previously completed projects for the City
are examples of our quality product which has resulted in a low overall cost for the City. We want to utilize the experience gained from working on the previous
projects, and to continue providing the City with
exceptional services to assure that another project is
successfully completed to the satisfaction of the City.

Tetra Tech's experience in design and engineering
services covers all facilities in the water and wastewater systems including:
to the City with options and solutions in a timely manner.

Tetra Tech fully understands the importance of your
projects. We are offering an outstanding team, which
combines the experience, depth, and understanding
needed for the successful delivery of this contract. Our core principles establish how we plan to work together
with the City to successfully complete your projects:
• Planning Studies
• Hydraulic Modeling
• Pipelines
• Storage
• Pump and Regulatory Stations
• Water Wells/Hydrogeology
• Treatment
• Recycled Water
• Customer Retrofits
• Civil Engineering Services
• Geotechnical Engineering Services
• Environmental Services
• Mechanical (HVAC and Plumbing)
• Structural Engineering
• Architectural
• Landscape Architectural and Irrigation
• Electrical, Instrumentation and Control
• Plan Check Services
To keep the City aware of the status of the project, we will schedule and administrate design meetings and
prepare monthly progress reports as appropriate for the assignment. The following are typical key issues which
we believe must be addressed to successfully complete
design services:
• Meeting schedule
• Coordination with City, and reviewing and permitting
agencies
• Utility coordination and conflict resolution
• Potholing of conflicting utilities
• Accounting for traffic control during alignment
selection
TETRA TECH Pau 12

•
On-CaH Civil Engineering Services I RFC? 412.3-002
• Analyzing alignment alternatives
• Providing construction phasing if necessary
• Identifying options for pipeline rehabilitation
• Hydraulic calculations
• Facility layout
• Operator safety
• Maintenance friendly
• Structure aesthetics match surrounding
neighborhood
We have provided a team that can respond to many
types of water and wastewater system projects including large diameter steel water mains, PVC small mains, new
wells and well retrofits, pump stations, pressure reducing stations, flow control facilities, and more. Each type of project requires its own specific approach. To explain our ability to perform, we have provided the following
detailed approach for a pipeline design:

Meeting r je t Schedule
Tetra Tech has the necessary resources to rapidly deploy and meet aggressive project schedules. In addition, our Project Team has recent pipeline experience that
includes many design and construction issues similar to your projects, placing our team high on the issues -
resolution learning curve. Based on this experience, we have summarized several ways to expedite the project
schedule for the various pipelines:
• Perform survey and aerial work immediately by
including an area that encompasses the alterative
alignments rather than just the assumed alignment.

Tetra Tech will not authorize the preparation of the
topography until the final alignment has been
approved.
• Expedite the alignment analysis by using existing
street plans, other construction plans, and field
investigations for location of existing utilities.
• Meet early with regulatory agencies to obtain permit
requirements and construction constraints.
• Findings related to alignment analysis will be
presented to the City in memorandums based on
logical segments prior to completion of the
Preliminary Design Report. As alignments are
approved, base maps will be prepared.
• Processing of Caltrans and railroad permits can be a
time-consuming and extensive process. To expedite
these approvals, Tetra Tech will complete the design
of any portion of the pipeline requiring these
permits immediately once the alignment has been
approved. This approach will provide the City with
the maximum contingency in case difficulties arise in
the permit process.

Resolving y Issues
Agency Coordination: Immediately upon Notice -to -
Proceed for each lateral, Tetra Tech will meet with the corresponding regulatory agencies to coordinate and
define the agency requirements.

Early coordination with Agencies and defining agency
requirements in Specifications will result in less chance of Change Order. The following has been found to be
successful to accomplish this:
• Working Hours
• Lane Closures
• Storage of Equipment
• Open Cut vs. Boring
• Trench Backfill
• Pavement Removal and Replacement
In conjunction with the signing of the plans by the
regulatory agencies or receipt of approved permit, Tetra Tech recommends a meeting occur to finalize the cost
implications of the backfill and pavement replacement
requirements, construction restrictions, traffic control, and other factors which could affect the cost of
construction. A memorandum of understanding will be
prepared after the meeting and distributed to the
attendees for their concurrence. This approach will
minimize the potential of change orders to the
contractor as a result of requirements added during the construction phase.

Utility Coordination: We propose to perform our utility research and investigation immediately upon issuance of the Notice to Proceed for each pipeline. During Design
we will contact USA Dig -Alert, send preliminary, second, and final utility notices, field walk the alignment, pothole if necessary, and identify critical utilities.

The USA markings for the geotechnical investigation will also be used to verify the location of the existing utilities.

In addition, the actual potholing activities will be
monitored to assist in the investigation of hazardous
materials. The potholing services will be completed by
use of the vacuum extraction method, thereby
minimizing pavement damage and traffic disruption.

In addition, a field walk must be completed to look for evidence of infrastructure (e.g., valve cans, trench patch, vaults, etc.) as some utility owners do not belong to USA Dig Alert, and others respond with only partially
complete information. We have learned to take the extra steps to verify potential underground infrastructure.

Hazardous Waste: Our previous experience on the West
Basin Municipal Water District and Long Beach Water
Department projects, have made us sensitive to the
negative impacts associated with the discovery of
hazardous materials within the pipeline trenches. These materials, if not properly planned for in the contract
TETRAPage 13

On-CaH Civil Engineering Services I RFC? 412.3-002
documents, could have a disastrous effect on the
schedule and cost of pipeline projects. Our geotechnical investigation borings will be done on the proposed
alignment and will include a sniffer to minimize the
potential of finding unknown hazardous materials during construction. The goal is to avoid the hazardous material, but if it must be encountered, it is important to be aware of it, quantify the amount and type and estimate the cost of disposal.

Traffic Control. When the proposed pipeline alignments
are located within highly traveled streets, traffic control will be a major concern of the regulatory agencies. Traffic control plans will be prepared with the objective of
providing the contractor with adequate room for safety
as well as efficient operation while providing the least possible disruption to the traveling public. We believe that traffic control is a key design element and it will be completed together with the design of the pipeline.

Alignment Selection: Proposed pipeline alternative
alignments will be evaluated relative to the following
items:
• Utilities
• Hazardous Materials/High Groundwater
• Constructability
• Traffic Impacts
• Community Impacts
• Permit Requirements
In addition, when the proposed pipelines cross signalized intersections which are highly traveled, the intersections need to be evaluated as to whether bore and jack
operation or open -cut construction will be the most
beneficial solution. During the preliminary design phase, we will prepare sketches of the proposed bore and
receiving pit locations and corresponding traffic control concepts. It should be noted that if the intersections are bored, the streets will not be able to be open to traffic at the end of each workday.

Construction Phasing: Construction phasing will be a key element of the project specifications. We will work with the regulatory agencies to minimize the impacts of the
construction to the adjoining properties. We are
sensitive to their concerns regarding construction
impacts and the concerns of the local residences and
businesses along the proposed alignments. The following are several key issues to consider:
• Identify Schools and Emergency Facilities
• Develop Plan to Minimize Impacts
• Maintain Access to Commercial, Businesses,
Residences
• Limit Length of Work Zone
Our previous experience has shown us the importance of
limiting the length of the total work zone the contractor will be allowed. By requiring the contractor to pressure test, place final pavement, and perform clean-up within reasonable working limits prior to starting new
excavation work, the construction impacts to the
public/community are minimized.

PROJECT MANAGEMENT D

PROCEDURES
Tetra Tech team's strength lies in the qualifications of our management team and our steadfast commitment to
following our propriety written Project Management
Policies and Procedures, to proactively manage the
project's schedule, resources, budget, and deliverables to ensure project metrics are maintained or exceeded, thus ensuring the overall success of the project.

Successful project teams need leaders who are agile and flexible with the ability to adapt quickly to changing
circumstances to maintain project schedules and
budgets. Successful organizations invest in their people, resources, and tools and develop processes and
procedures that can implemented rapidly in times of
uncertainty.

The benefits of our organization's investments and Tetra Tech's culture of developing leaders and managers with
these abilities has been on full display during the
COVID-19 crisis. Over the past several years, Tetra Tech invested in highly secure, cloud -based software products, including the complete suite of Microsoft Office 365,
allowing our staff to collaborate and communicate
remotely. This investment allows Tetra Tech's
professionals and project teams to remain fully
connected and hard at work servicing our clients
regardless of their location. Because our investments
include the latest and most advanced cybersecurity
features and certifications, we can extend secure and
remote access to project files and deliverable work
products to our subconsultants and clients, as well.

During the COVID 19 crisis, Tetra Tech closed hundreds of offices located in countries across the globe. Despite
those challenges, 95 percent of our staff, more than
25,000 associates, were able to work from home and
continue to produce deliverables such as memos,
reports, permit applications, and engineering designs.

We are proud that our organization successfully
navigated the challenges impacting so many of our staff and offices. Our project team has demonstrated that we
can adapt quickly and continue to produce high -quality work products while incorporating client and stakeholder input and feedback without "face-to-face" meetings and
"printed" materials. As a result, Tetra Tech is confident we can maintain workflow, meet the project's schedule
goals, and stay agile and productive in the event of
another disaster declaration.

TETRA TECH Page 1

On-CaH Civil Engineering Services I RFC? 412.3-002
Planning the Project
Every project, regardless of size and complexity, must
undergo the same planning process. Of course, each step is scalable based on the various components of the
project. Planning starts with a thorough understanding of the goals and objectives of the project, items to be
provided by others, and all project stakeholders. With
this basic information, the project is further developed through the creation of a detailed scope of work,
including the deliverables. Next the WBS, or Work
Breakdown Structure, which mirrors the scope of work is developed to assign resources, budget and schedule
required to complete each scope of work item. All
elements together yield the basis for the Project
Management Plan (PMP).

This planning performs multiple functions. The obvious
function is that it will allow us to identify critical path tasks and staffing needs. We can make sure that certain resources are made available when needed to complete
the task along the schedule's critical path so that
subsequent dependent tasks can begin as scheduled. In
addition, it ensures that our team has properly
considered the resources and schedule needed to
complete each task, eliminating surprises during project implementation.

Another function is that, through the process of creating the plan and distributing it to our team members, it
serves as a primary initial communication provided at the internal kick-off meeting to verify that all team members are completing the project in concert with each other,
understanding the reliance on various disciplines, outside influences including subconsultants, permitting agencies and the client.

The PMP also provides direction on internal and external communication protocol, design, and CAD standards,
filing systems/document control, project risks, internal schedule to allow for proper quality reviews, and quality review plan to be followed. We create the work plan and then work the work plan — rigorously —to ensure overall project success for all stakeholders.

Project Management
To accomplish the project goals, we will utilize proven project management techniques and tools, clearly
described in our organized and detailed work plan. From the many similar projects we have completed in the past, we have developed a methodology and philosophy that
will serve as the basis for this project.

The Project Manager will be responsible for making
certain that the project meets schedule, budget, and
quality goals. Our Project Managers will direct and rely on a team of experienced design managers, engineers,
technical staff and subconsultants to carry out the
technical details of the project. The Project Manager will provide overall project management including contract
administration, and budget, schedule tracking, kick-off and progress meetings and controls, and meeting the
project's quality goals.

We rely on systematic management procedures to
ensure the project is delivered on time, and within
budget. Tetra Tech will implement standard project
controls to monitor and evaluate project progress. A
detailed critical path schedule with milestone submittal dates and a projected project expenditure curve will be developed. A centralized computer -based project
accounting system will be used to quickly and accurately monitor the expenditure of person hours and dollars.

Budget status for the entire project, as well as budget status for individual tasks, will be monitored so that
comparisons and contingency plans can be developed as
needed throughout the life of the project. The accurate accounting of project expenditures, coupled with a
detailed critical path schedule incorporating milestone submittals, will enable Tetra Tech to monitor total
project status and therefore modify our project work
plan at the earliest indications of deviations from the initial plan.

The Project Manager is committed to effective
communication and accurate documentation as they are
fundamental to the success of the project. Meeting
minutes, schedule, memoranda, monthly progress
reports, decision logs, and other information will be
made available for the project team and to the City. The Project Manager will be proactive in communicating
through telephone calls, emails, and one-on-one
meetings.

Communications
Our approach to this contract includes a "teamwork and
partnering" style with the City. We are hired for our
resources, expertise, independent thought, technical
background, and problem -solving abilities. We also
recognize that the City possesses these same attributes of past experiences, knowledge, and innovative ideas.

Therefore, we understand that it is imperative to work
closely with your staff to ensure a successful project.

The Tetra Tech team's goal is to keep the City's staff
informed from day one of the project. Communication
tools include formal progress reports, meeting agendas
and minutes, e-mail and an informal give-and-take
approach starting with our Project Manager and
extending to every member of the Tetra Tech project
team. Our Project Manager will be responsible for day-
to-day communications. However, at the project outset,
a chain of command and communication methods will be
set-up and agreed upon.

TETRATECH Page 1

On-CaH Civil Engineering Services I RFC? 412.3-002
Schedule Control
Tetra Tech will implement standard project controls to
monitor and evaluate project progress. We have a
long-standing commitment with our clients to deliver
projects on time. However, throughout the course of any given project, there may be occasions where project
schedules slip for a variety of reasons outside of our
control. We have successfully mitigated project schedule delays in the past by increasing the available staff
assigned to a project and by assisting our Clients with thorough and timely reviews of deliverables. The Tetra
Tech team will always strive to work with the City to
bring any foreseeable delays back on schedule.

The Tetra Tech team is committed to delivering a project that not only meets or exceeds the performance criteria established by the City, but to accomplish this within the allocated budgets. Budget and schedule tracking tools
will be used to manage the day-to-day activities of a
project and ensure that the project is progressing within schedule and under budget; our Project Manager utilizes Tetra Tech's "PM Portal." The PM Portal is the primary
project reporting software system proprietary to Tetra
Tech. It provides quick and easy access to a variety of reports for managing projects, in real time, including
labor and direct cost per task, subcontractor's costs per task, budget remaining, and other financial information.

Risk Management Approach
Our risk management approach predicts problems which
may negatively impact the project and determines the
course of action to mitigate the risk should it occur. Our approach embodies a continuous process of identifying,
assessing, mitigating, monitoring, managing, and
controlling risk in accordance with our corporate risk
management policy and best commercial practices. We
have refined this approach over a 50-year history, on a variety of private, state/federal governmental and
municipal contracts.

Resource Management
Tetra Tech employs project management tools for
project required labor allocation per project, to the task level, with a three-month forecast. When compared to
the expected peak workload, Tetra Tech has more than
enough staff capacity to bring on additional resources to meet all of our deadlines. The team members who have
been included in this project team were not only selected based on their qualifications that fit with the
requirements of the project, but because they are
available to commit their time to this project.

A tool that Tetra Tech employs to manage available
human resources is keeping an updated long-term view
of key deliverable dates within Microsoft Project. This allows us to ensure that the intensive last minute
subconsultant coordination, reprographics, and shipment of deliverables do not conflict with other commitments.

If one or more deadlines coincide, this forward planning allows the team to prepare for surges.

Quality rant alit antral
Our team clearly understands the importance of the
City's projects and the importance of ensuring that the City receives the highest quality product. Quality
management is an integral part of our project
management work plan. Tetra Tech has developed an
office environment and philosophy which encourages,
and requires, a very high level of quality in which our clients have come to expect from Tetra Tech.

Our quality assurance program includes a detailed
QA/QC Plan will be prepared and submitted for review by the City, upon request. This plan establishes lines of
communication and procedures for ensuring quality
during all phases of the project. The plan is flexible and can be modified to respond to your specific
requirements, as our best efforts are fruitless unless they meet your criteria.

In keeping with our open communications policy, our
Quality Control documents can be made available to the
City throughout the project. We believe that it is in our best interest to have our clients fully informed and up to date on our quality control process. Design reviews, field inspections, and material testing can be provided to the City in either hard copy or electronically.

We recognize that implementation of a QA/QC Plan will
be an important element in how the City assesses the
success of this project. The QA/QC Plan will be
incorporated into the PMP. QA/QC review forms will be
used to document that internal reviews have been
conducted. All comments will be identified with the
reviewer's name. When comments are resolved to the
satisfaction of the reviewers, the reviewers and our
Project Manager will sign off on the review forms.

The QA/QC Plan will ensure technical adequacy and QC
of work, along with design parameters are translated
into planning and design documents. QA/QC will be
directed by Tom Epperson, PE, and Steve Tedesco, PE,
and led by Mark Bush, PE, and Jason Fussel, PE, PLS, ENV SP, LEED AP, QSD/P. Formal QA/QC reviews are
scheduled around project submissions. The review will
be completed well ahead of the submission date to allow time to correct potential errors and omissions, including complete subconsultant coordination. In every CA/QC
review, a checklist form developed by Tetra Tech for the project is utilized for the review. The reviewer completes the checklist by adding text and makes any additional
comments in red on the document. The Project Manager
and the CA/QC Manager review the comments for fatal
TETRA TECH Page 16

On-CaH Civil Engineering Services I RFC? 412.3-002
flaws. If none are found, the Project Manager oversees
the implementation of the comments by closing each
comment on the form with a response and by addressing
the changes on the plans by highlighting the revision.

Upon receipt of a Task Order Request from the City, our proposed Project Director/Manager, Tom Epperson will:
• Review the available information for the Task Order.
• Meet with the City's Project Manager and City staff
members (via teleconference or in person) to discuss
the intent of the project and clarify the nature of the work.
• Meet with the Tetra Tech project team for selection
of the appropriate Task Manager and technical staff
resources for the assignment.
• Follow-up meeting with the City's Project Manager
to ensure expectations are well defined.
• The selected Task Order Team will assist in the
preparation of the Task Order budget, goals and
schedule.

Data Research: Tetra Tech will determine the availability of design drawings, calculations, reports, photographs, studies, etc., which are pertinent to the completion of the Task Order. These documents will be reviewed to
determine their impact on the project prior to a visit to the project site.

Coordination with the City: A Manager will meet with key personnel from the City in person to discuss the
proposed work. A site visit will be conducted at this time to determine actual site conditions, record pertinent
measurements, and take photographic records of the
project site.

Draft Proposal: The Project Manager will prepare a draft proposal which will define our understanding of the
proposed work, our approach to completing the required
work, the project team, the scope of the proposed work, schedule, and fee. Fee estimates for each Task Order will be prepared using a cost/price modeling tool (CPM)
which was developed by Tetra Tech. The CPM is a
spreadsheet that itemizes each of the tasks required to complete the project, the personnel required to
complete each task and the number of hours required by
each person for each task. In addition to providing a
tabulation of the hours required to complete each task, the CPM also reports the total number of hours required by each person and a total cost for the entire Task Order.

Large Task Orders may require a comprehensive project
schedule, prepared using MS Project; smaller task orders may require less formal schedules, which may be
conveyed to the City in writing via email. The draft
proposal will be reviewed by our Quality Assurance
Manager, Task Manager, and select team members.

Final Proposal and Work Plan: Tetra Tech will discuss the draft proposal internally, make the necessary
adjustments and submit our final proposal. After the fully executed agreement between the City and Tetra Tech is
in place, the Project Manager will prepare a Work Plan.

The Work Plan is an internal Tetra Tech document which
will contain the scope of work, project team, schedule, and budget for the project. The format of the Work Plan will vary with the type and size of the given task order.

For small projects the Work Plan may be a short
memorandum which is distributed by email to the
members of the project team. No internal kick-off
meeting will be required for smaller projects. For larger projects, the Work Plan will be a comprehensive
document which is distributed and discussed at an
internal kick-off meeting. The kick-off meeting will
include all key project team members. The input of
engineers and specialists of other disciplines may be
required to provide comprehensive solutions to some of
the tasks. Tetra Tech has experienced staff in all required disciplines who will address any situation that comes up.

Task Order Authorization: Upon receipt of the
notice -to -proceed from the City for a given Task Order, Tetra Tech will schedule a project kickoff meeting or
teleconference, update the Quality Control Plan (as
necessary), and prepare a Health and Safety Plan (if
required).

Project Execution: The last and most important
component of the management process is to perform the
work. This component is not easily summarized here
because it is dependent on the type of work required and the scope of work for each Task Order.

TETRAPage 17

On-CaH Civil Engineering Services I RFC? 412.3-0e2
Tetra Tech's portfolio includes hundreds of projects ranging from minor pipeline improvements and lift station upgrades to treatment plant improvements and expansions. Through efficient management and leadership, our professional staff are currently providing similar engineering services on an as -needed basis for over 35 clients in Southern California, including Golden State Water Company, City of Santa Ana, and Water Replenishment District of Southern California. Many of these clients are repeat clients as Tetra Tech has provided responsive service and innovative solutions on time and within budget.

We understand the privilege of on -call contracts and the necessity to provide timely responses while maintaining schedules and budgets.

We believe our best relevant experience are the projects we have completed as part of our past and on -going On -Call Contracts with Southern California municipalities. We are confident these past projects will attest to our technical excellence, responsible staff, and our complete understanding of every aspect of an On -Call engineering services contract.

As part of these As -Needed Contracts our projects have included a wide range of engineering services including feasibility studies, design, plan review, construction management services; and design services for pipelines, pump stations, rehabilitation of facilities, lift stations, electrical, SCADA, and structural engineering support services.

Tetra Tech has vast experience executing projects for clients from as -needed contract lists. The table below shows a list of some of our on -call contracts for various agencies and types of projects services:

TETRAPage 18

On-CaH Civil Engineering Services I RFC? 412.3-002
Tetra Tech's experience in civil engineering design for public works stems from vast project experience in
Southern California over the past 57 years completing
projects for municipalities. We are familiar with design and construction constraints that are specific to the City having completed nearly 15 task orders for the City in the past 5 years.

Our experience in civil design is relevant to the services requested in this contract in that the projects we have successfully delivered for public agencies include street design and widenings, intersection improvements,
signalization, drainage improvements, passive and active parks, storm water quality and stormwater capture
projects, utility improvement projects, and structural
design of bridges and facilities. This experience allows our staff to more effectively implement solutions that
are compatible with the goals of the City, including
budgeting, procurement, performance, and operation
and maintenance.

Water/Wastewater Experience
The following summarizes the experience of the
members of our project team:

Pipeline Projects
During the last 15 years, members of our project team
have been involved in the design and/or construction
support of more than 325 miles of water and recycled
water pipelines. Tetra Tech deems pipeline projects to be just as important as facility projects because
comprehensive research and design can mitigate field
issues. We believe we have a very proficient team that
executes these projects efficiently and successfully.

Sewer Relining or Rehabilitation Projects
For more than 15 years, members of our project team
have been involved in the design and/or construction
support services of more than 100,000 feet of relining or rehabilitation of existing sewer mains. Tetra Tech has
extensive understanding of the temporary handling of
the sewage flow during the work as well as the
importance of detailing the bypass facilities within the construction plans and specifications.

Pump Station/Well Projects
Within the last 15 years, our team has been involved in the design and/or construction support of more than
40 water/recycled water pump stations and 15 water
wells. We have developed a team, including a
hydrogeological engineer, that works efficiently and
effectively together to provide our clients with the
maximum capacity required.

Lift Station Projects
For more than 15 years, members of our project team
have been involved in the design and/or construction
support services of more than 10 lift stations.

Flow Control Facility Projects
During the last 15 years, members of our project team
have been involved in the design and/or construction
support of more than 15 flow control facilities.

Reservoir Projects
Within the last 15 years, our team has been involved in the design and/or construction support of more than
60 water/recycled water reservoirs (steel and concrete).

The reservoir design projects utilize a combination of our in-house structural and electrical teams along with a
geotechnical firm to present the best design
improvement to the client.

Water Quality and Disinfection Projects
During the last 15 years, our project team has completed design of over 11 treatment (process/membrane)
facilities within Southern California, including design of disinfection facilities at over 10 well and/or reservoir facilities. With new PFAS regulation becoming
increasingly required within the State of California, our engineers have become proficient in the design of the
latest treatment options available completing over 14
local design projects of PFOS, PFOA, TCE, TOC and
Perchlorate.

Structural Seismic Retrofits
Our in-house structural group has been responsible for
the structural analysis and design of water projects
completed by Tetra Tech. This work has also included
numerous seismic retrofits throughout Southern
California. The seismic analysis includes a three-
dimensional finite element analysis, member stress
analysis, and foundation stability assessment.

Electrical and Controls
Our in-house electrical group has also supported the
projects done within the Irvine office, including utility, industrial, residential, commercial, governmental, and
military projects. Our teams work efficiently together to provide our clients with the most comprehensive design.

Planning/Engineering Studies
For more than 15 years, members of our Project Team
have completed over 15 master plans and/or hydraulic
modeling, engineering studies within Southern California.

Street Improvement perience
Tetra Tech offers roadway design and engineering
services for plans, specifications, and estimates (PS&E) packages to cities, counties, and Caltrans. Tetra Tech has TETRATECH Page 1

•
On-CaH Civil Engineering Services I RFC? 412.3-002
completed various roadway geometric design plans on
projects of all sizes ranging from bike path and parking lot design to interchange and major corridor design.

Tetra Tech will develop preliminary design concepts into PS&E for the City to advertise the construction contract.

Tetra Tech is experienced and knowledgeable with the
codes and design criteria that will govern the concept
and final design for the project. The PS&E will be
prepared to satisfy the requirements of the City, County, RWQCB, AASHTO, Manual on Uniform Traffic Control
Devices (MUTCD), California Building Code (CBC), and the Standard Specifications for Public Works Construction
(SSPWC).

Our engineers are experienced in integrating
environmental, regulatory, and community requirements
to provide functional and efficient infrastructure
improvements. For the cost estimate, Tetra Tech will
substantiate quantities for all contract pay items with quantities calculations. Unit costs will be based on
Caltrans historical cost data, RSMeans, recent bid results, or other sources as appropriate. For lump sum work
items, we will include a breakdown of major components
along with adequate cost backup justifying the total lump sum cost. Quantities and estimates will be prepared in
Microsoft Excel. Cost will include subtotals for Right -of - Way and Utility work.

Plans will be produced per City, County, and/or Caltrans Standard Plans and Specifications, and typically include the following:
• Preliminary Road Alignments, Profiles and Grading
Concepts, Cross Sections
• Roadway Plans/Profiles/Details
• Contour Grading Plans
• Drainage Plans/Profiles/Details
• Curb, Gutter, Sidewalk and Curb Ramp Design
• Utility Identification, Composite Plans, and
Mitigation
• Road Signage and Delineation Plans (Striping Plans)
• Road Repair Assessments and Recommendations
• Traffic Signal Plans
• Street Lighting Design
• Construction Staging and Traffic Control Plans
• Landscape/Irrigation Plans
• Retaining Wall/Fencing Plans
• Composite Utility Plans
• Encroachment Permits
Strom r i 1 r li and Hydrology
Reports/Design
Tetra Tech has prepared numerous studies and designs
involving varying aspects of hydrologic and hydraulic
modeling, storm drains, and application of floodplain-
management techniques. With extensive experience in
hydrologic, hydraulic, storm drain, and floodplain-
management services, Tetra Tech provides solutions for
our clients by:
• Performing hydrologic/hydraulic analyses
• Investigate drainage problems or complaints,
drainage report preparation
• Master planning of comprehensive water resource
and drainage plans
• Flood control feasibility studies and concept reports preparation for new projects, improvements, or
modifications
• Prepare opinions of probable cost, conduct
benefit/cost, and other economic analyses
• Floodplain mapping studies [i.e. Flood Insurance
Studies (FIS) and Letters of Map Revision (LOMRs)]
through the Federal Emergency Management
Agency
• Preparation of basin and river management studies
• Provide legal and expert witness support for
technical water resources
• Public involvement communication programs
Traffic/Striping Improvements
Often with geometric or operational changes, revisions
are needed to properly adjust the current signage and
striping delineation. Tetra Tech has proven experience in the preparation of signing and striping plans and gives special attention to evaluating traffic and pedestrian
safety. All plans and specifications would conform to
agency standards, including MUTCD, APWA, and
AASHTO.

Pavement i n
The analysis of a pavement structural section must
reflect many factors that affect the life cycle and
maintenance costs of the pavement. The
recommendation must include consideration of the
subgrade, soil classification, traffic loads, pavement
material, localized instabilities, and subsurface drainage.

Recycled material or alternate pavement design
evaluating emerging technologies need to be analyzed
with respect to the following criteria:
• Initial construction cost
• Life cycle cost
• Construction delay and impact
• Facility maintenance and ease of repair
• Pavement noise, smoothness
• Industry capacity and local contractor capability
TETRAPage 1 1 0

On-CaH Civil Engineering Services I RFC? 412.3-002
Tetra Tech has sampled and
analyzed PFAS on over 100 military,
commercial, and municipal sites
throughout the United States. We
fully understand that PFAS
treatment is dependent on the
concentrations of competing
contaminants such as total organic
carbon, iron, manganese, sulfate,
nitrate, chloride, oil, and grease,
suspended solids and other
compounds present throughout
groundwater basins.

Our PFAS Design Team has completed nearly 10 PFAS related projects for the City! We pride ourselves in working diligently to understand our clients' needs, the specific elements of the project at hand and the political and community drivers. Tetra Tech has exceptional qualifications in planning, permitting, design, and construction management of large water infrastructure projects. We will bring the best local resources supported by our national expertise.

Legend: GAC — Granular Activated Carbon, IX — Ion Exchange, UVAOP — Ultraviolet Light Advanced Oxidation Process, RO — Reverse Osmosis TETRA TECH Page I 1 I

City of Downey On-CaH Civil Engineedrig Services I RFC? 4123-002 TETRA TECH Page 112

City of Downey On-CaH Civil Engineedrig Services I RFC? 4123-002 TETRA TECH Page 113

A summary of our Project Team's water and wastewater experience is included earlier in our Water/Wastewater Project Experience section of this SOQ. The following is a brief list of pipeline and well/pump station projects completed with agency contact information:

TETRA TECH Page114

City of Downey On-CaH Civil Lngineedrig Services I RFC? 412.3-002 Water System Improvement Projects I City of Downey
Primary Design Consultant (Primary/Sub) Total Design Cost $225,000 1 2021-Current Lorena Powell, PE, Senior Civil Engineer 562/904-7110
The City of Downey awarded Tetra Tech four pipeline projects over the past few years: Samoline/Melva Streets; Florence Avenue; 5th Street, and Cole Street. The scope of work included preparation of design plans and cost estimate, including some construction phase services. The overall pipeline replacement work was for about 7,000 LF of pipeline replacement in residential/arterial streets of pipeline diameters ranging from 8-inch to 12-inch.

The latest project consisted of about 900 LF of 8-inch water main design, including preparation of design plans. The improvements proposed are located on Cole Street between Brookshire Avenue and Patton Road, a residential street in the City of Downey. The project scope included the installation of a new ductile iron water main, associated fittings, gate valves, fire hydrant assemblies, copper water service lines, meters/meter boxes, and connection to existing mains at all intersections. The project plans did not include survey, but as requested included base mapping created from right-of-way maps, utility as -built drawings and field reconnaissance to verify visible surface features. The project design was completed in May 2023, and construction completed within a few months. Tetra Tech is in the process of finalizing the record plans for the City.
1951 Cohort Pipeline Replacement' Mesa Water District
Primary Design Consultant (Primary/Sub) I Construction Cost $17,000,000-$19,000,000 ( 2020-Current Andrew Wiesner, PE, Principal Engineer 1949/207-5458
This project scope consisted of the preparation of plans, specifications, and cost estimate for the replacement of about 25,000 LF of water main ranging in size from 4-inch to 12-inch diameter. The existing pipe was CML&C steel material constructed in 1951. The proposed pipelines are PVC C-900 material and will mitigate increasing break rates.

Much of the project work was within the commercial area of the City of Costa Mesa and required evaluation of construction sequencing as well as details for the many connections to existing services and water mains. Tetra Tech met with Mesa Water during the design phase to establish the requirements by the City of Costa Mesa regarding construction hours. This also included how much work could be done and keep customers in service and minimizing disruption. The project has been delayed since 2020 because of other Mesa Water project priorities. However, Tetra Tech is nearing completion this year.

The scope of work also included bidding phase services.

Water Main Replacements I City of Lakewood
Primary Design Consultant (Primary/Sub) ( Overall Construction Cost $4,500,000 1 2022-Current Derek Nguyen, PE, Director of Water Resources 1 5621866.9771, Ext. 2701 Tetra Tech was retained to prepare construction drawings, plans, specifications, and engineer's construction cost estimates for five phases of water main replacement projects. Water mains ranged between 6- and 8-inches diameter. Alignments were selected to minimize disruption to traffic and aid operation of pipe valving. New services and fire hydrants were field located to minimize disruption to public property and residents. Total linear footage was approximately 150,000 LF.

Spinnaker Bay Dr Phase 1 & 2 j Long Beach Utilities Department Primary Design Consultant (Primary/Sub) Construction Cost $4,100,000 - Spinnaker Phase 1; $3,000,000 - Spinnaker Phase 2 2019-Current
Wendy Chen, PE, Manager of Engineering 562.570.2324
This project scope included in the replacement of ductile iron water mains installed in the 1980s in the Spinnaker Bay residential neighborhood of Long Beach. Over the last 10 years, there have been several main breaks and LBUD wished to replace the DIP with PVC C-900 pipe material.

In June 2020, Tetra Tech received authorization to prepare the design documents (plans, specifications, and cost estimate) for Phase 1 of the water main replacements. The project included about 3,700 LF of 6-inch, 8-inch, and 12-inch ductile iron pipe (DIP), 121 domestic services, 23 valves, and 6 fire hydrant laterals. In June 2021, LBUD selected Tetra Tech to prepare the design documents for Phase 2 of the water main replacements. This project includes about 2,500 linear feet of 8-inch and 12-inch DIP, including associated services, valves, fire hydrants, and a condition assessment.

The scope of work also included the bidding and construction management phase services for both phases of the project.

The construction cost difference between the two phases was due to the significant increase of costs for several bit items, including 6-inch/8-inch PVC pipe, fire hydrant assemblies, colored stamped concrete, and slurry backfill. Contractors are busy and bidding higher costs in addition to the material cost increases across the board. In addition, Division of Drinking Water required extensive precautions for the location near the waters, including concrete encasement and additional joint restraints throughout the system.

TETRA TECH Page 1 'i

City of Downey On-Cal Civil Enginee rig Services I RFC? 412.3-002 Crown Valley Pipeline Replacement IMoulton Niguel Water District Primary Design Consultant (Primary/Sub) ( Cost $14,500,000 1 2019-Current Todd Dmytryshyn, PE, Assistant Director of Engineering 1 949/831-2500 The Crown Valley Pipeline Replacement Project located in the City of Laguna Niguel consists of replacing 9,400 linear feet of existing 12-inch ACP sewer force main and 9,700 linear feet of existing 12-inch and 16-inch steel water main. The replacement pipeline consists of a dual 12-inch PVC sewer force main and 12-inch and 16-inch PVC water main constructed completely within Crown Valley Parkway. Project required construction of a new Master Meter vault connecting Moulton Niguel Water District's system to the Joint Transmission Main operated by South Coast Water District, construction of sewer air release valve vaults and connecting manholes, connections to exiting water mains and services and abandonment of existing pipelines and appurtenances. Tetra Tech provided preliminary design, final design, and engineering services during construction.

Well No. 29 With PFOS and PFOA Treatment Systems I City of Orange Primary Design Consultant I Cost $746,000 1 2020-Current Sonny Tran, PE, Assistant Water Manager 1 714/288-2475
Tetra Tech is providing engineering design services for the well drilling and well equipping of a potable water well in the City of Orange. The City's Water Division operates a water distribution system including water mains, wells, pump stations, and reservoirs. The City pumps water from the groundwater basin through an existing well network that includes 12 active wells and imports water from the Colorado River and Northern California as a secondary source. Well No. 29 is proposed to enhance the reliability, efficiency, and redundancy of the City's water system. Currently, Well No. 8 and its supporting facilities were located within the existing site. The property was mostly unpaved and small areas of asphalt around the well facilities. The Well No. 8 is to be destroyed and the new Well No. 29 and PFOS/PFOA treatment system constructed.

Well No. 29 will pump water to the 370 Zone and is expected to produce approximately 3,000 GPM. The PFOS/PFOA treatment system shall be designed to treat approximately 3,500 to 4,500 GPM, which includes the total production of proposed Well No. 29 and existing Well No. 9, located 300 feet to the north. The well facilities include a wellhead enclosure, chlorination, and electrical building, with an external roll -up generator connection for backup power. The on -site piping includes piping from Well Nos. 9 and 29 to the treatment system and post treatment piping to the distribution system. The Water Division is to bid the well drilling phase and well equipping phase separately. The site includes building and landscaping design, paving, and fencing. Well drilling construction began in February 2021 and well equipping began after drilling was complete.

Garfield Avenue Complete Street Improvements I City of South Gate Primary Design Consultant I Current
Elias Saikaly, PE 1 3231563-9581
Tetra Tech is providing professional engineering design and construction support services for this complete streets project for the City of South Gate. The scope of this project includes providing multi -modal pedestrian and bicycle design treatments to this 2.5 mile stretch of heavily congested corridor. The project will provide ADA improvements to approximately 42 existing curb ramps and an additional 10 newly constructed curb ramps. Existing gaps will be closed within sidewalks to improve pedestrian mobility. Three new pedestrian activated push button signals with enhanced crosswalks will be designed and constructed to further improve mobility. Medians will be installed at strategic locations as a safety counter measure, preventing dangerous vehicular left -turn movements at congested locations. Class II and Class III bike lanes and routes will be designed throughout the corridor and a Class I bike path will be designed within an adjacent park, providing access from the corridor to the Los Angeles Bicycle Path located adjacent to the Los Angeles River. Medians will be landscaped, and roadway rehabilitation assessment will be performed to identify the most economical way to utilize City funds to improve roadway conditions within the corridor. The project has multiple funding sources, including Federal Active Transportation and State Highway Safety Improvement Project funds which must be administered separately.

TETRAPage 1 1 6

Ian -Call Civil Engineering Services ( RFC? 412.3-002
Tetra Tech has assembled our personnel based on individual strengths, technical skills, and experience working together.

We tailored our team composition to fit specific scopes of work and provide the City with a team that is local, experienced, and seamlessly transitions into the roles required under each on -call task order. Below is our organization chart and a table summarizing our Project Team's years of experience and percentage of time devoted to this contract may be found following this page.

Neha Gajjar, PE= Justin Smith, PE
(WaterlWastewater Sewer & ells) (General Civil)

TASK MANAGER TASK MANAGER TASK MANAGER
Erma 'enkins Laurence Euerra, PE bike Tsoi„ PE
DESIGN ENGINEER DESIGN ENGINEER ✓' DESIGN ENGINEER
Jaden biller„ PE s„; Matt Vera, PE Erin Cabatiero, PE

TASK MANAGER
Eric Yuen, PE, SE

DESIGN ENGINEER
Mike Olsen, PE

TASK MANAGER
3aen Kassar, PE`

DESIGN ENGINEER
Douglas Seaman

TASK MANAGER
Kerr Berard, PE=1

DESIGN ENGINEER
Ruben Lino, EIT

ENGINEERDESIGN
Amanda Taylor, PE

TASK MANAGER
Elva Pangilinan, PE,
ENV CP, CDT*

DESIGN ENGINEER
Tyler Parra, PE

TASK MANAGER

TASK MANAGER

TASK MANAGER

TASK M NAG IS
Devin Newton, PE, QSD/P*
Craig Zia[, PE, QSD/P*
Elva Pangifinan, PE,
C�raig Ziel
ENV SR CDT*

DESIGN ENGINEER

DESIGN ENGINEER
DESIG
Bridget Elliott, PE
Elva Pangifinan, PE

DESIGN ENGINEER
PE. EN V S11
s
TETRATECH Page 1 1 7

City of Downey On-CaH Civil Engineedrig Services I RFC? 4123-002 TETRA TECH Page 118

On-CaH Civil Engineering Services I RFC? 412.3-002
Project D Cr`3,5cton,M�'"„n ger (Water/WastewaterSewer Wells) Professional Civil Engineer, California, No. 36399, Exp. 2024 [email protected]
Mr. Epperson has more than 42 years of professional experience in water, wastewater, and reclaimed water engineering.

Tom has been responsible for the preparation of water, wastewater, and reclaimed water master plans; project design reports for various water, wastewater, and reclaimed water facilities; and the planning and design of water, wastewater, and reclaimed water pipelines, along with pump stations and reservoirs. Tom has completed the design, bidding, and construction management of over 325 miles of water/reclaimed water/sewer mains, 40 water/reclaimed water pump stations, 15 well head facilities, 12 sewer lift stations and 25 water/reclaimed water storage reservoirs throughout Southern California.

NIN:1 11 !11 tit'?
Cole Street Water System Improvements, City of Downey, CA. 2022. Project Director for the preparation of plans and specifications for a new 8-inch water main at approximately 700 linear feet. Improvements proposed on Cole Street from Brookshire Avenue to Patton Road include the installation of a new ductile iron water main, associated fittings, gate valves, fire hydrant assemblies, copper water service lines, meters/meter boxes, and connection to existing mains at all intersections.

Samoline Avenue and Melva Street Water System Improvements, City of Downey, CA. 2021. Project Director. Tetra Tech developed plans and specifications for water system improvements of approximately 2,000 linear feet of 8- to 12-inch domestic water main replacement along Samoline Avenue and service reconnections/meter replacement along Melva Street.

La Palma Avenue and Tustin Avenue Watermain Replacements at OCTA Crossing, City of Anaheim, CA. 2019 - Ongoing.

Project Director. The OCTA planned to construct an additional railroad track for the Metrolink within its existing right-of-way as part of the Anaheim Canyon Station Metrolink Project. The new tracks cross City of Anaheim water mains at La Palma Avenue and Tustin Avenue and therefore the mains must be rerouted and placed within a steel casing. Tetra Tech prepared plans and specifications to replace the existing 36-inch CCP with a 36-inch steel in a 48-inch steel casing in La Palma Avenue, the existing 12-inch CIP with a 12 inch DIP in a 24-inch steel casing in La Palma Avenue, and the existing 12-inch CIP with a 12-inch DIP in a 24-inch steel casing in Tustin Avenue. The project also included coordination with OCTA.

Well No. 32 Rehabilitation, City of Santa Ana, CA. 2017 - Ongoing. Project Manager. Engineering planning and design to assist with the rehabilitation of Well No. 32. The project includes the construction of new CMU block well building and sodium hypochlorite building, sodium hypochlorite disinfection facility, approximately 3,300 linear feet of 16-inch pipe from Well No. 32 to John Garthe Reservoir, bore and jack under channel crossing and site improvements.

West Chandler Well, South Croddy Well and Pipeline, Mesa Water District, Costa Mesa, CA. 2017 - Ongoing. Project Director for the drilling and equipping of Well Nos. 12 and 13, two new potable water wells (approximately 1,050 feet deep), to provide additional local water reliability to the customers of Mesa Water District. The project involves the demolition of existing buildings at Well Nos. 12 and 13 properties within the City of Santa Ana. Both wells are located outside of Mesa Water's service area and will require the construction of approximately 4,400 feet of pipeline to connect the proposed wells to Mesa Water's existing system. Each well site includes the construction of a vertical turbine pump estimated to produce approximately 3,000 gpm, new CMU block wall building, new chemical storage facility, sodium hypochlorite and aqua ammonia disinfection facility, and site and landscaping improvements.

Regional Lift Station Force Main Replacement, Moulton Niguel Water District, Aliso Viejo, CA. 2017 - Ongoing. Project Manager. Mr. Epperson is the project manager providing engineering services for the replacement of approximately 15,000 linear feet of 20-inch and 24-inch Techite sewer force main with Laguna Niguel Regional Park. Regional Lift Station and Force Mains are critical wastewater facilities that pump flow from MNWD sewer collection system to South Orange County Wastewater Authority Regional Treatment Plant. The replacement force main consists of dual 24-inch pipeline approximately 8,000 feet length and will be constructed with Laguna Niguel Regional Park. Scope of services include preliminary design, final design, and construction phase services.

Gisler-Redhill Trunk Improvements, Orange County Sanitation District, Fountain Valley, CA. 2018. Project Manager for the replacement of 21- and 24-inch sewer mains in the Gisler-Redhill Trunk Improvements to be replaced with 24- to 36-inch pipelines. The project traverses through the cities of Tustin, Santa Ana and Irvine. Scope of services included preliminary design, final design, and construction support services.

TETRAPage 1 1 9

•
On-Cal Civil Engineering Services I RFC? 412.3-002
Professional Civil Engineer, California, No. 39261, Exp. 2023 [email protected]
With more than 40 years of professional experience, Steve is experienced in the planning, analysis, design, and construction of water supply, water treatment, and water distribution and collection systems. His experience includes water master planning, water treatment plant design, construction management and Design -Build delivery methods. Steve has extensive design experience in the water and wastewater treatment, including Desalination, Membrane Filtration (MF), Reverse Osmosis (RO), Ultraviolet Treatment (UV), Nanofiltration, Granular Activated Carbon (GAC), Ion Exchange (IX), and waste disposal projects. Mr. Tedesco brings a unique perspective to the overall project, as he is well accustomed to not only reviewing deliverables for quality, but also for constructability.

On -Call Engineering Services for PFAS Treatment Systems Design, Orange County Water District, Orange County, CA. 2021 - Ongoing. Project Director. Tetra Tech was selected by OCWD to design the first three PFAS projects (six affected wells) as part of their program to construct treatment facilities for 66 affected wells in Orange County. Projects include:
• Serrano Water District Well #5 and #9 (Completed Design) —This project consists of a 3,000 GPM IX System with a bag filter pre-treatment, 3,000 GPM Booster Pump Station and new chemical feed system for disinfection. • Kimberley Well 1A (Completed Design) — Located on a very small site with a single well this facility is designed to produce 3,000 GPM using an IX System with a bag filter pre-treatment and new chemical feed system for disinfection. • Yorba Linda Water District Headquarters Plant (Completed Design) — This system will treat water from 10 wells with a total capacity of 17,400 GPM. An IX System consisting of 11 pairs of Lead/ Lag Vessels (22 vessels total), bag filter pretreatment, Booster Pump Station, and new Onsite Generation System for chlorine disinfection. To get the system on the existing site an extensive analysis of the site improvements was completed. • Fullerton Main Water Treatment Plant (Completed Design) —Tetra Tech is providing design and construction services for the site which has the following wells: Well 3A — 2,250 GPM, Well 4 —1,400 GPM (currently being rehabilitated), Well 5 —1,500 GPM, Well 6 —1,400 GPM, Well 7 —1,700 GPM (off-line), Well 8 — 2,500 GPM, and Well 7A — Proposed.

Five of the wells (4, 5, 6, 7 and 8) produce water with TCE and other VOCs. Wells with higher concentrations of TCE are blended with wells with lower concentrations of VOCs in a blending forebay structure. Fullerton has an approved blending as part of their Division of Drinking Water (DDW) permit. Well 3A pumps directly to the distribution system and Well 7 can pump to either the forebay or the distribution system. In accordance with this information Tetra Tech is providing design and construction services.

Well ET-1 PFAS Study, Irvine Ranch Water District, Irvine, CA. 2021. Engineer of Record. ET-1 was developed to increase utilization of the Irvine Subbasin through recovery and treatment of VOC impaired, poor -quality groundwater. The project cleans up the contaminated VOCs, with the treated water used for non -potable purposes. Water extracted from inside the VOC plume is treated using granular activated carbon and air stripping technologies. PFAS was found in the product water from the existing plant. IRWD contracted with Tetra Tech to develop options for treating PFAS at ET-1 and planning the site for the future addition of Wells ET-2 and 78 if PFAS is found at these wells.

PFAS Study for Five Wells, City of Downey, CA. 2021. Project Manager for a study to determine the options to add PFAS treatment to five existing wells in Downey affected by PFOS & PFOA. Study included analysis of water quality, siting study, comparison of IX and GAC treatment, evaluation of piping wells to a central location for treatment, capital cost estimates, O&M estimates, and lifecycle cost analysis. The report was used to as an attachment to the City of Downey's funding.

Well No. 29 and PFOS/PFOA Treatment Systems, City of Orange, CA. 2020 - Ongoing. QA/QC. Tetra Tech is providing design and construction support services for the City's new Well No. 29 and PFOS/PFOA treatment system. The proposed Well No. 29 will pump water to 370 Zone and is expected to produce approximately 3,000 gallons per minute. The PFOS/PFOA treatment system shall be designed to treat approximately 3,500-4,500 gpm, which includes the total production of proposed Well No. 29 and existing Well No. 9. The well facilities shall include a wellhead enclosure, chlorination, and electrical building, with an external roll -up generator connection for backup power. The on -site piping shall include piping from Well Nos. 9 and 29 to the proposed treatment system and post treatment piping to the distribution system.

TETRAPage 120

On-Cal Civil Engineering Services ( RFC? 412.3-002
QA Q
Professional Civil Engineer, California, No. 60477, Exp. 2024 [email protected]
Mr. Bush has more than 28 years of professional experience in water, wastewater and recycled water engineering. He has been responsible for the completion of over 100 miles of potable water, recycled water and sewer mains, 20 potable water and recycled water pump station and well projects and 14 potable and recycled water reservoirs. Mr. Bush is an integral part of the Water/Wastewater Department and brings leadership, strong work ethic, technical knowledge, and dedication to overall client satisfaction on every project.

On -Call Engineering Services, City of Santa Ana. Ongoing. CA/QC Manager. Performed QA/QC services for projects under On -Call Engineering Services Contracts including water mains, sewer mains, pump stations, wells, lift stations, reservoirs, flow control/PRS facilities, and recycled water projects.

King Street Pump Station Improvements, San Antonio Water System, San Antonio, TX. 2020 - Ongoing. CA/QC. Currently providing design, bidding, and construction services for a new 8.0 MGD high service pump station with a firm capacity of 5.3 MGD, replacement of three well pumps and motors, new disinfection and fluoridation facilities, new electrical and control facilities, new yard piping, valves, and various site/civil improvements.

Mid -Basin Injection: Centennial Park Design Services, Orange County Water District, Fountain Valley, CA. Ongoing. CA/QC. Responsible for the QA/QC of the design of four injection wells to be located within Centennial Park in the city of Santa Ana for Orange County Water District. In addition to the engineering services for the four injection wells, the project includes the design of the supply pipeline, backflush pipeline, bridge crossing, two shared facility sites, a monitoring well site, site improvements, and paving of park access roads and parking lots.

City Trunk Line North Unit 2, Los Angeles Department of Water & Power, Los Angeles, CA. 2020. CA/QC Manager. Design of the City Trunk Line North Unit 2, which will consist of 12,200 linear feet of 54-inch diameter welded steel pipe. The design includes three bore and jack tunnels and 3,500 linear feet of slip -lining, where new 54-inch steel pipe will be pushed through an existing 72-inch riveted steel pipeline.

Water Resources Integration Program (WRIP) Phase 2 Pump Station Improvements Project, San Antonio Water System, San Antonio, TX. 2020. CA/QC. Phase 2 project elements included two additional 1,250 hp vertical turbine pumps installed in existing cans with VFDs at Twin Oaks West Pump Station, a booster pump station with variable frequency drives in addition to hydropneumatic surge tanks, a second 7.5 MG ground storage tank No. 2, and a fourth pump at the PZ 4 Pump Station at Old Pearsall Road Pump Station, and approximately 3,000 feet of 48-inch water pipeline with a control valve assembly to transition from production mode to recharge mode on site.
x � . Lml L,
Professional Civil Engineer, California, No. 70879, 2025 [email protected]
Mr. Fussel has more than 20 years of engineering experience that includes work on both public and private sector jobs. Mr. Fussel's strengths include stormwater analysis, studies, design, preparation of specifications, bid documents, cost estimates, and construction support services. Mr. Fussel's experience also includes conducting topographic surveys, utility surveys, Record of Surveys, ALTA surveys, and coordination of aerial topography. Jason is currently overseeing Tetra Tech's on -call contract with the City to provide On -Call Stormwater Project Design Services.

First Street Pedestrian Improvements, City of Santa Ana, Santa Ana, CA. Principal -in -Charge responsible for overseeing PS&E, along with the Water Quality Management Plan (WQMP) for this active transportation project. The project involves the widening of the existing sidewalks by three feet by reducing the width of the vehicle travel lanes along a 1.2-mile portion of First Street. Improvements include reconstructing ADA curb ramps, reconstructing hardscape (curb & gutter, bus stop pads, asphalt pavement, and driveway approaches), creating bulb -outs at intersections, restriping travel lanes, installing high visibility marked crosswalks, relocating and/or adjusting existing utility features to grade, relocating street furniture, modifying existing pedestrian push buttons, installing new traffic signal detector loops, installing a new traffic signal at the intersection with Lacy Street, retrofitting and/or reconstructing drainage structures, and installing stormwater BMPs.

Lincoln Avenue Pedestrian Pathway, City of Santa Ana, Santa Ana, CA. Principal -in -Charge responsible for overseeing PS&E for this active transportation project. Services included permitting through the Southern California Regional Rail Authority (Metrolink). The project is funded in part by ATP state grant funds. The pedestrian pathway will run parallel with Lincoln Avenue west of the existing railroad tracks. The improvements will commence at the intersection of Lincoln Avenue and Park Lane, continue north between the back of the residential properties and the railroad tracks, and end at the existing Santiago Trail, under the railroad bridge that crosses Santiago Creek. The improvements include a 12-foot pathway and railroad -approved safety fencing, drought tolerant landscaping, pedestrian lighting, and signage to identify the pathway.

TETRAPage 121

Can-CaH Civil Engineering Services ( RFC? 412.3-002
Dept,ity Project Manager (General Civil)
Professional Civil Engineer, California, No. 55574, Exp. 2024 [email protected]
Ms. Gajjar has more than 30 years of professional experience providing project management, planning, and design of water transmission, distribution, and storage facilities projects. Neha has significant experience preparing plans and specifications for water/sewer mains, storm drains, pipelines, and has an intimate understanding of these requirements for many municipalities. Ms. Gajjar's responsibilities as engineering lead include establishing design parameters, planning activities to meet client needs and project schedules, and managing required appropriate technical resources required for each project.

Firestone Blvd. and Lakewood Blvd. Water System Improvements, City of Downey, CA. 2023 - Ongoing. Project Manager. Development of plans and specifications for water system improvements of approximately 1,300 linear feet of 8 to 12-inch water mains. Improvements include installation of new fire service laterals, backflow devices, copper water service lines, and meters/meter boxes/fire hydrants.

Improvements on Lakewood Blvd at Union Pacific Railroad Crossing include installation of a new 12-inch ductile iron carrier pipe within a 24-inch steel casing pipe underneath the Union Pacific Railroad, including extension of the piping to connect to the existing main on either side.

Cole Street Water System Improvements, City of Downey, CA. 2022. Project Manager for the preparation of plans and specifications for a new 8-inch water main at approximately 700 linear feet. Improvements on Cole Street from Brookshire Avenue to Patton Road include the installation of a new ductile iron water main, associated fittings, gate valves, fire hydrant assemblies, copper water service lines, meters/meter boxes, and connection to existing mains at all intersections.

Washington Well Drilling Phase 2, Drilling and CEQA, City of Santa Ana, CA. 2020 - Ongoing. Project Manager. The City of Santa Ana selected Tetra Tech to plan the drilling and equipping plans of a new well within a vacant City property near the intersection of Washington/Penn. The first phase of the project identified the drill location and facility configuration within the lot. This is the second phase and focuses on the final well site layout and renderings for the new well facility. The work also includes coordination with environmental and cultural requirements in advance of any drilling efforts.

La Palma Avenue and Tustin Avenue Watermain Replacements at OCTA Crossing, City of Anaheim, CA. 2019 - Ongoing. Project Manager. The OCTA planned to construct an additional railroad track for the Metrolink within its existing right-of-way as part of the Anaheim Canyon Station Metrolink Project. The new tracks cross City of Anaheim water mains at La Palma Avenue and Tustin Avenue and therefore the mains must be rerouted and placed within a steel casing. Tetra Tech prepared plans and specifications to replace the existing 36-inch CCP with a 36-inch steel in a 48-inch steel casing in La Palma Avenue, the existing 12-inch CIP with a 12-inch DIP in a 24- inch steel casing in La Palma Avenue, and the existing 12-inch CIP with a 12-inch DIP in a 24-inch steel casing in Tustin Avenue. The project also included coordination with OCTA.

Justins
PE
z �; 6 t` ilk,
Deputy �., Project �: Manager (,'Gle.,�enall C,,i H,.

Professional Civil Engineer, California, No. 85736, Exp. 2024 [email protected]
Mr. Smith brings extensive knowledge in civil engineering from his involvement in a variety of municipal projects of varying size and funding. His design experience includes parking lot and roadway geometries, pedestrian accessibility improvements, bike trails, parks, construction, and post -construction stormwater BMPs, storm drain improvements including hydrologic and hydraulic design, overall utility plans, structural design, and grading activities varying from mass grading to final precise grading plans. His other experience includes cost estimating, preparing specifications, providing construction/post-construction support, performing utility research, and coordinating with the project team and outside agencies.

First Street Pedestrian Improvements, City of Santa Ana, Santa Ana, CA. Project Manager. Responsible for preparing PS&E along with the Water Quality Management Plan (WQMP) for this active transportation project. The project involved the widening of the existing sidewalks by three feet by reducing the width of the vehicle travel lanes along a 1.2-mile portion of First Street between Flower Street and Standard Avenue. Improvements included reconstructing ADA curb ramps, reconstructing hardscape (curb & gutter, bus stop pads, asphalt pavement, and driveway approaches), creating bulb -outs at intersections, restriping travel lanes, installing high visibility marked crosswalks, relocating and/or adjusting existing utility features to grade, relocating street furniture, modifying existing pedestrian push buttons, installing new traffic signal detector loops, installing a new traffic signal at the intersection with Lacy Street, retrofitting and/or reconstructing drainage structures, and installing stormwater Best Management Practices (BMPs).

TETRATECH Page 122

On-Cal Civil Engineering Services ( RFC? 412.3-002
JenkinsErica
v and RWPipeline a wp,.a,eEst ;zExae€, or
[email protected]
Ms. Jenkins has more than 30 years of experience and has been responsible for the preparation of water, sewer, reclaimed water pipeline projects, and project design reports for various water and sewer facilities. She has been responsible for completing the design, bidding, and construction management of over 50 miles of water/reclaimed water/sewer mains throughout Southern California.

Firestone Blvd. and Lakewood Blvd. Water System Improvements, City of Downey, CA. 2023 - Ongoing. Project Coordinator.

Development of plans and specifications for water system improvements of approximately 1,300 linear feet of 8 to 12-inch water mains.

Improvements include installation of new fire service laterals, backflow devices, copper water service lines, and meters/meter boxes/fire hydrants. Improvements on Lakewood Blvd at Union Pacific Railroad Crossing include installation of a new 12-inch ductile iron carrier pipe within a 24-inch steel casing pipe underneath the Union Pacific Railroad, including extension of the piping to connect to the existing main on either side.

Sewer System Rehabilitation, City of Hawthorne, CA. 2020 - Ongoing. Project Coordinator. Project tasks include preparation of design plans, specifications, and Engineer's estimate of probable construction costs for the recommended sewer system improvements. The scope included evaluation of existing CCTV inspection tapes; 20,000 LF of sewer rehabilitation; 10 point repairs, 40 manholes for rehabilitation; and 47 manholes with sewer invert/manhole repairs.

Laurence Esguerra, PE
Aa w Via, Min elini g, Reh al litatio
Professional Civil Engineer, California, No. 73803, Exp. 2025 [email protected]
Mr. Esguerra has more than 20 years of experience in water and wastewater specializing in the design of over 75 miles of potable water, recycled water, and sewer pipelines, 5 pump stations, 5 production wells, 2 lift stations, reinforced concrete and steel reservoirs, flow control facilities, and pressure reducing valve vaults. Along with his extensive technical skills in water/wastewater Mr. Esguerra is experienced in project management by leading multi -disciplinary projects trough preliminary design, final design, and construction.

Regional Lift Station Force Main Replacement, Moulton Niguel Water District. Ongoing. Assistant Project Manager providing engineering services for the replacement of approximately 15,000 linear feet of 20-inch and 24-inch Techite sewer force main with Laguna Niguel Regional Park. Regional Lift Station and Force Mains are critical wastewater facilities that pump flow from MNW D sewer collection system to South Orange County Wastewater Authority Regional Treatment Plant. The replacement force main consists of dual 24-inch pipeline approximately 8,000 feet length and will be constructed with Laguna Niguel Regional Park. Scope of services include preliminary design, final design and construction phase services.

Crown Valley Pipeline Replacement, Moulton Niguel Water District. Ongoing. Project Manager for the replacement of the I.D. No. 1 Master Meter and the accompanying interconnecting piping between the South Coast Water District's Joint Transmission Main and the MNWD's proposed Crown Valley Transmission Main. Project consists of three components: Lower Salada Lift Station Force Main Replacement (approx. 9,400 LF of dual force mains), Crown Valley Parkway Transmission Main Lower Reach Replacement (approx. 9,700 LF of transmission main), and I.D. No. 1 Master Meter Relocation. Master Meter Relocation consists of existing utility relocations; new below -grade vault; new mechanical piping and appurtenances; retaining wall; 16-inch steel piping; site grading; miscellaneous electrical and SCADA improvements.

Mike Tsoi,
PE
T ua£e£,a a,u Station Upgrades
Professional Civil Engineer, California, No. 53715, Exp. 2025 [email protected]
Mr. Tsoi has more than 34 years of professional experience in water, wastewater, and recycled water engineering. Mike has been responsible for the planning and design of water, wastewater, and recycled water pipelines along with pump stations, lift stations, flow control facilities, reservoirs, and site improvements. Over the span of his career, Mr. Tsoi has designed more than 15 wells, 20 pump stations, and 300,000 feet of pipeline.

Fleming Zone 8 Tank and Zone 8 to 9 Booster Pump Station Demolition and Replacement, Irvine Ranch Water District, Irvine, CA. 2019 - Present. Deputy Project Manager. Engineering design services for demolition and replacement of an existing above ground 0.15 MG Zone 8 steel tank and Zone 8 to 9 pump station consisting of two 600 gpm vertical turbine pumps each equipped with a 60-horsepower motor. The Fleming pump station site also contains an existing administrative building with a conference room and restroom, two storage buildings, and an AT&T cellular antenna facility. Services also include storage building replacement; reservoir management system building with sodium hypochlorite and aqueous ammonia storage and feed systems and an "in -tank" chemical injection and mixing system; a 2,000-gallon diesel fuel storage tank and dispensing system; and site electrical service, controls, and telemetry improvements.

TETRA TECH Page 12

On-CaH Civil Engineering Services I RFC? 412.3-002
Kara Buttacavoli, PE
PFAS Treatment
Professional Civil Engineer, California, No. 60452, Exp. 2024 [email protected]
Ms. Buttacavoli has 26 years of experience in analysis, design, and construction management for various types of public works projects.

Kara has experience with treatment design using GAC, IX, and centralized treatment approaches; and has recently completed the design of six other PFAS plants ranging in size from 4 to 25 MGD. She fully understands all the tasks needed for completing this type of project.

Kara will provide overall design direction, coordination, and technical oversight.

PFAS Study for Five Wells, City of Downey, CA. 2021. Lead Project Engineer for a study to determine the options to add PFAS treatment to five existing wells in Downey affected by PFOS and PFOA. Study included analysis of water quality, siting study, comparison of IX and GAC treatment, evaluation of piping wells to a central location for treatment, capital cost estimates, C&M estimates, and lifecycle cost analysis. The report was used as an attachment to the City of Downey's funding application to Water Replenishment District of Southern California.

PFAS Study for Wells ET-1, ET-2 and 78, Irvine Ranch Water District, Irvine, CA. 2021. Project Manager for a study to determine the options to add PFAS treatment to an operating VOC air stripper project. Well ET-1 operates at 2.0 MGD through one tray air stripper that discharges into a small wet well with a single booster pump station. The existing plant is located on a small lot with limited space. Project included analysis of water quality, options for IX or GAC treatment and analysis of adding wells ET-2 and 78 to the project if they become affected by PFAS. Capital and O&M costs were also prepared.

Eric Yuen, PE, SE
t( t 3 tU l E y tie'-.=.

Professional Civil Engineer, California, No. 75983, Exp. 2024 Professional Structural Engineer, California, No. 6177, 2024 [email protected]
Mr. Yuen has more than 16 years of experience in the design, analysis and detailing in structural engineering. Eric is knowledgeable in reinforced concrete, masonry, structural steel and wood frame design, and construction for a variety of building and infrastructure projects including reservoirs, water/wastewater treatment facilities, as well as seismic retrofit of existing structures.

Timber Ridge Booster Pump Station Replacement, Yorba Linda Water District, Placentia, CA. 2020 - Present. Structural Project Manager.

Project includes engineering planning, design, and construction -phase services for the replacement of an existing 35-year-old booster pump station. Tetra Tech to design and construct a new CMU block pump station building; replace the existing gas engine pump and enclosure with a new electric driven pump/motor with the same or greater rated capacity; install an emergency natural gas engine driven generator set; install two bladder tanks for surge protection for the 1000 Zone and 1300 Zone; replace existing direct buried mag meters on the 1300 Zone and 1160 Zone discharge piping with above ground meters; and replace and upgrade the existing electrical equipment.

Clearview Reservoir Assessment, Golden State Water Company, Santa Ana, CA. 2019. Project Manager. Responsible for the overall project for the visual assessment and seismic evaluation for the two concrete reservoirs at the Clearview site located at 1501 Clearview Lane, Santa Ana, CA.

Electrical,
�aa Instrumentation & Controls
aiw�3as , aa�an
Professional Electrical Engineer, California, No. 15809, Exp. 2024 [email protected]
Mr. Kassar has more than 30 years of experience in electrical engineering and industry standard that include electrical engineering staff management, project management, construction management and supervision, water and wastewater treatment, petro-chemical design, and environmental soil and groundwater treatment. Mazen's background includes designing medium and low voltage power distribution, designing instrumentation, control systems and SCADA systems for a wide -variety of projects, and the installation of electrical systems for remediation projects, including soil vapor extraction systems and groundwater pump and -treat systems.

SDG&E Battery Energy Storage SystemEngineering, San Diego, CA. 2023. Managed electrical engineering for four Microgrid projects within San Diego County. Each site is 10 MW and consists of BESS, inverters, power transformers, 12kV switchgear, 480V switchboard and site lighting. These sites store energy when demand is low and output power to the grid when demand is high.

As -Built Drawing Pump Stations, Los Angeles Department of Water and Power, Los Angeles, CA. 2020. Electrical Engineer. The purpose of this task order was to provide LADWP with accurate and current as -built drawings and equipment inventory of the existing pump stations. Services included developing survey records and performing an arc flash studies pump stations selected by LADWP.

TETRAC Pare 124

On-Cal Civil Engineering Services ( RFC? 412.3-002
3 Technical S-k�udies""Reports.1,'Hydraulic Modeling
Professional Civil Engineer, California, No. 45499, Exp. 2024 [email protected]
Mr. Berard has extensive experience in many facets of water engineering, including numerous studies ranging from complete water master plans to efficiency studies. Ken's design experience includes preparing bid documents for reservoirs, pump stations, wells, pipelines, chlorination facilities, and pressure reducing facilities. Mr. Berard also has extensive experience in hydraulic modeling. He has used and is familiar with more than six software packages in addition to open channel flow software.

Chino Airport Remedial Action Plan, County of San Bernardino, Chino CA. Ongoing. Project Manager for this multi -phased project that includes 20 wells on 10 sites and over 24,000' of 6" to 16" watermain. The project primary goal is to extract contaminated water from a shallow aquifer and convey it to an existing plant for treatment to be drinking water. The pipeline includes two jack and bore tunnels; one under a state highway, and the other under an open flood control channel.

Sewer Master Plan, City of Whittier, CA. 2018. Project Manager. Prepared a master plan for a sewer system serving a population of 88,000. H2OMAP Sewer was used in conjunction with an existing GIS to model the conveyance system. The use of SmartCover flow monitoring technology allowed for model calibration as well as providing the City with a permanent ability to monitor future flows in real time.

Elva Pangifinan, PE, ENV SP, CDT
Professional Civil Engineer, California, No. 81113, Exp. 2025 [email protected]
Ms. Pangilinan has extensive experience in designing and preparing improvement plans for both municipal and federal projects. She is also experienced with performing various hydrology studies and preparing reports. She has gained knowledge in BMP and Low Impact Development implementation through her involvement in various stormwater capture projects throughout Southern California.

Taylor Yard Paseo del Rio and Proposition 0 Water Quality Improvement, City of Los Angeles, Bureau of Engineering, Los Angeles, CA. 2022 - Ongoing. Civil Engineer. Responsible for providing conceptual design services for the water quality component of the project. Tetra Tech is providing pre -design, design, and construction support services for the Taylor Yard Paseo del Rio and Proposition 0 Water Quality Improvement Project. Project includes transforming the approximately 42-acre derelict Taylor Yard G2 parcel along the Los Angeles River into a nature -focused open space with a flourishing riparian corridor that blends recreation with wildlife habitat.

Urban Orchard Multi -Benefit Park and Green Infrastructure, Trust for Public Land, South Gate, CA. 2020. Project Engineer. Provided cost estimating and engineering design for the diversion and pretreatment of dry- and wet -weather flows to irrigate a community garden and wetland. Tetra Tech was contracted to provide a feasibility study to transform a 30-acre post-industrial site into a multi -benefit, green infrastructure park with recreational features along the Los Angeles River. The study also explored the naturalization of the concrete Bandini Channel that runs through the project area, and opportunities to clean, infiltrate, and reuse stormwater onsite for possible irrigation of the urban orchard.

Devin Newton, PE, QSD/P
Professional Civil Engineer, California, No. 72952, Exp. 2024 [email protected]
Mr. Newton is highly skilled in infrastructure design and can provide timely, cost-effective design solutions for his clients. He possesses current experience with modern stormwater management and Low Impact Development practices including hydraulic and hydrologic design of bio-treatment and flood control systems. Devin is knowledgeable in all phases of the Land Development entitlement process from conceptual planning to construction. Mr. Newton has extensive experience in the design of ADA compliant facilities, property title research, grading design, erosion control, and land surveying.

PG&E Interconnect Land Net, Pacific Gas and Electric, Paso Robles, CA. 2015 - Ongoing. Design Engineer. Responsible for surveying and mapping services to prepare base topographic mapping for approximately 30 miles of future PG&E electric transmission line alignment to connect to a proposed PG&E Substation. Tetra Tech is performing the research and field work necessary to create the Land Net base of property and franchise lines along the proposed routes.

DTLA Arts District Pedestrian and Cyclist Safety Active Transportation Project (ATP 3), City of Los Angeles, Bureau of Engineering, Los Angeles, CA. 2018 - Ongoing. Senior Civil Engineer and Engineer of Record. Responsible for overseeing the project design and preparation of final plans, specifications and estimates for this active transportation project, funded by a CalTrans ATP grant. The project area is characterized by a complex street system of very long blocks with few safe crossing locations, complicated intersections, and very limited bike facilities that create mobility challenges for residents, workers, and visitors to the district.

TETRATECH Page 125

On -Coal Civil Engineering Services ( RFC? 412.3-002
Craig Ziel,
PE, t
Hydiolog't Hyd aulics,Sae rr: ., Drain
Professional Civil Engineer, California, No. 74743, Exp. 2023 [email protected]
Mr. Ziel's experience involves the planning, analysis, and design for residential, commercial, and municipal development projects. His proficiency includes the design and preparation of construction documents for sewer, water, and storm drains, as well as improvement plans for the geometric design of roads, highways, bike paths and parking areas. He also has sufficient experience preparing grading and drainage plans for roads, mass grading, finish grading, and grading for Low Impact Development projects.

Plan Checking, Permitting, and Inspection On -Call Contract, City of Buellton, CA. 2017 - Ongoing. Project Engineer. Tetra Tech is contracted to provide plan checking, permitting and inspection services for the City of Buellton. Services include reviewing and approving plans through multiple comment iterations, issuing permits for construction of work or encroachment purposes, inspecting work to ensure the following of proper specifications or standards, and providing final inspection and acceptance of work. Plan reviews include review of Improvement Plans, Storm Water Quality Control Plans, Water Quality Improvement Plans, and Hydrologic and Hydrologic storm water plans. Some of the associated projects include a residential townhome complex consisting of 25 buildings with more than 150 dwelling units, a brewery expansion featuring a subsurface stormwater infiltration system, a new commercial building development with multiple offsite improvements, and a parking lot expansion which included stormwater retention features.

E Cagi err',i entai Plai ni g
[email protected]
Ms. Fell has more than 28 years of experience preparing environmental documentation and more than 24 years in a senior management role. Paula has prepared and managed California Environmental Quality Act/National Environmental Policy Act documents including Initial Studies, Mitigated Negative Declarations, Environmental Impact Report, Environmental Assessments, and Environmental Impact Statements, for projects throughout California on behalf of federal, state, regional, and local agencies, and private clients.

SA-1 Hydro -Generator Replacement, City of Santa Ana, CA. 2020 - Present. Environmental. Engineering design services for replacement of a 33-year-old turbine generator. Services include removing the existing turbine/generator and installing a new unit and connecting to the electrical and control systems, upgrading the ventilation system, new RTU control panel, coordination with Enterprise Automation, and replacement of the existing switchboard and MCC. The demolition of the existing unit will include the removal of the generator, turbine shaft, impellers, and upper housing. Replacement will include new construction involving, new motorized valve upstream of the new turbine/generator, new manual valve downstream, new ball valve with motorized flow controller, and new PRV valve (in series). t m
Hydrogeologist
Professional Geologist, California, No. 7406, Exp. 2024 Professional Hydrogeologist, California, No. 810, Exp. 2024 [email protected]
Mr. Lee has more than 33 years of professional and managerial experience in hydrogeological assessments, water well design, construction and rehabilitation, basin evaluations, water well profiling and testing, dewatering analysis, environmental soil and water quality assessment and remedial strategy, design, and implementation, feasibility studies, remedial action plans and compliance activities, and technical review.

Central Basin Wellfield Feasibility Study, Los Angeles Department of Water and Power, Los Angeles, CA. Conducted a hydrogeological evaluation to determine the feasibility of tapping an additional 15 cubic feet per second of unutilized water rights from the adjudicated Central Basin in Los Angeles and identified optimal wellfield locations. The process of evaluating and identifying the potential wellfield locations included a review of basin hydrogeology, groundwater sources and recharge, existing LADWP water infrastructure, existing wells, and environmental data; running a groundwater model to simulate pumping and estimate available capacity; and identifying treatment alternatives. Based on the results, four most favorable potential wellfield locations in Central Basin were identified in collaboration with LADWP.

Groundwater Recharge Wells, Water Replenishment District of Southern California, Pico Rivera, CA. Designed and managed construction of three 800-foot-deep groundwater recharge wells and one nested monitoring well adjacent to San Gabriel River for the Water Replenishment District of Southern California's Groundwater Replenishment Improvement Program. Work included preparing technical specifications, NPDES permitting and reporting, geologic and geophysical analysis to identify appropriate zones for groundwater recharge, well design that incorporated glass bead filter pack, well construction oversight, well development, and aquifer testing.

TETRAPage 126

A true indicator of our abilities lies in our industry wide reputation. We have been long regarded as a premium engineering firm providing clear solutions tocomplex challenges. Accordingly, meurge you tocontact our references tninquire first-hand knowledge about our past work. In addition to our successfully completed projects for the City, we offer the references provided below. Each are familiar with the wide range of services we provide, and the key personnel on our team.

TETRA TECH Page 127

2023 - 2026

HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE
Project Management
Project Manager 1
Project Manager 2
Sr Project Manager
Program Manager
Principal -in -Charge
Engineers
Engineering Technician
Engineer 1
Engineer 2
Engineer 3
Project Engineer 1
Project Coordinator
Project Engineer 2
Sr Engineer 1
Sr Engineer 2
Sr Engineer 3
Principal Engineer
Planners
Planner 1
Planner 2
Sr Planner 1
Sr Planner 2
Sr Planner 3
Designers & Technicians
CAD Technician 1
CAD Technician 2
CAD Technician 3
CAD Designer
Sr CAD Designer 1
Sr CAD Designer 2
CAD Director
Survey Tech 1
Health & Safety
H&S Administrator
Sr H&S Administrator
H&S Manager
2023/2024 2025/2026
2023/2024 2025/2026
Construction
$220.00
$230.00
Construction Project Rep 1
$80.00
$290.00
$300.00
Construction Project Rep 2
$90.00
$305.00
$310.00
Sr Constr Project Rep 1
$105.00
$340.00
$350.00
Sr Constr Project Rep 2
$120.00
$340.00
$350.00
Construction Manager 1
$170.00
Construction Manager 2
$190.00
Construction Director
$235.00
$80.00
$85.00
$115.00
$120.00
General & Administrative
$130.00
$135.00
Project Assistant 1
$67.00
$140.00
$145.00
Project Assistant 2
$75.00
$155.00
$160.00
Project Administrator
$95.00
$165.00
$170.00
Sr Project Administrator
$130.00
$175.00
$180.00
Sr Graphic Artist
$130.00
$180.00
$185.00
Technical Writer 1
$97.00
$185.00
$190.00
Technical Writer 2
$124.00
$210.00
$220.00
Sr Technical Writer
$155.00
$300.00
$310.00
Information Technology
$95.00
$100.00
Systems Analyst/Programmer 1
$77.00
$115.00
$120.00
Systems Analyst/Programmer 2
$115.00
$135.00
$140.00
Sr Sys Analyst/Programmer 1
$130.00
$150.00
$155.00
Sr Sys Analyst/Programmer 2
$196.00
$195.00
$200.00
Project Accounting
Project Analyst 1
$90.00
$65.00
$70.00
Project Analyst 2
$114.00
$75.00
$80.00
Sr Project Analyst
$155.00
$90.00
$100.00
$105.00
$115.00
Reimbursable In -House Costs
$140.00
$145.00
Photo Copies (B&W 8.5"x11")
$ 0.15/Each
$150.00
$155.00
Photo Copies (B&W 11"x17")
$ 0.40/Each
$160.00
$170.00
Color Copies (up to 8.5"x11")
$ 2.00/Each
$50.00
$50.00
Color Copies (to 11 "x17")
$ 3.00/Each
Compact Discs
$10/each
Large format copies
$0.40 S.F.
$95.00
$100.00
$120.00
$125.00
Mileage -Company Vehicle
$0.90/mile
$145.00
$150.00
Mileage-POV
$0.65/mile*
*current GSA POV mileage rate subject
to change
$85.00
$95.00
$110.00
$125.00
$175.00
$195.00
$240.00
$70.00
$80.00
$100.00
$135.00
$135.00
$100.00
$130.00
$160.00
$80.00
$120.00
$135.00
$200.00
$95.00
$120.00
$160.00
All other direct costs, such as production, special photography, postage, delivery services, overnight mail, printing and any other services performed by subconsultant will be billed at cost plus 15%.

NOTE: Rates subject to change annually.

CERTIFICATE OF LIABILITY INSURANCE
(MM/YYYY)
DA 10/01/2023
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
Aon Risk Insurance Services West, Inc.

LOS Angeles CA Office

CONTACT
NAME:
(A/C.NNo. Ext): (866) 283-7122 ((A No.): (800) 363-0105 E-MAIL
ADDRESS:
707 Wilshire Boulevard
Suite 2600

INSURER(S) AFFORDING COVERAGE
NAIC #
Los Angeles CA 90017-0460 USA

INSURED
INSURER A: Zurich American Ins Co
16535
Tetra Tech, Inc.
3475 E. Foothill Boulevard
Pasadena, CA 91107 USA
INSURER B: American Guarantee & Liability Ins Co
26247
INSURERC: Allied world Surplus Lines Ins Co
24319
INSURERD: American International Group UK Ltd
AA1120187
INSURER E:

INSURER F:

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD

INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested INSR
LTR

TYPE OF INSURANCE
ADD
INSD
SUBR
WVD

POLICY NUMBER

POLICY EFF

MM/DD/YYYY

POLICY EXP

MM/DD/YYYY
LIMITS
X

COMMERCIAL GENERAL LIABILITY
GLOl 174 5
1 1
'U717674

EACH OCCURRENCE
$2 , 000 , 000
CLAIMS -MADE X❑ OCCUR

DAMAGE TO RENTED
PREMISES Ea occurrence
$1, 000, 000
X
MED EXP (Any one person)
$10 , 000
X,C,U Coverage

PERSONAL & ADV INJURY
$2 , 000 , 000
GEN'L AGGREGATE LIMIT APPLIES PER:

GENERAL AGGREGATE
$4 , 000 , 000

POLICY M PRO LOG
JECT

PRODUCTS - COMP/OP AGG
$4 , 000 , 000
OTHER:

A

AUTOMOBILE LIABILITY
BAP 1857085 05
10/01/2023
10/01/2024

COMBINED SINGLE LIMIT
Ea accident
$5,000,000
BODILY INJURY ( Per person)

ANY AUTO
BODILY INJURY (Per accident)

OWNED SCHEDULED

AUTOS ONLY AUTOS
IX

X HI RED AUTOS X NON -OWNED

ONLY AUTOS ONLY

PROPERTY DAMAGE
(Per accident
X

UMBRELLA LIAB
X
OCCUR
62785232
10/01/2023
10/01/2024

EACH OCCURRENCE
$5,000,000

EXCESS LIAB

CLAIMS -MADE

AGGREGATE
$5,000,000
DED I X RETENTION $100,000
A
B

WORKERS COMPENSATION AND

EMPLOYERS' LIABILITY Y / N
ANY PROPRIETOR / PARTNER! EXECUTIVE
OFFICER/MEMBER EXCLUDED? N
(Mandatory in NH)
N/A
Wc254061605
AOS
WC185708705
WI
10/01/2023
10/01/2023
10/01/2024
10/01/2024

X I STATUTE ORH
E.L. EACH ACCIDENT
$1, 000 , 000
E.L. DISEASE -EA EMPLOYEE
$1, 000, 000
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE -POLICY LIMITt
$1, 000, 000
c
Professional Liability and
03120276
10/01/2023
10/01/2024
Each Claim
$5,000,000
contractor's Pollution
Prof/Poll Liab-Claims Mad
Aggregate
$5,000,000
Liability
SIR applies per policy ter
fis & conditions
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

CERTIFICATE HOLDER CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE Evidence Of Insurance

EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
C.J�ex elG�fCe/9illLliQ9lCG c/Gti!/�Cd �f'Ld4 e/elf
©1988-2015 ACORD CORPORATION. All rights reserved.

ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD

U TETRA

lhhhk-
Statement of Qualifications
*n-Call Civil Engineering Services
PFQ No. 23-002
October 13, 2023

ATTACHMENT G

October 13, 2023
City of Downey
Attn.: Matthew Baumgardner, P.E.

Director of Public Works/City Engineer
Department of Public Works
11111 Brookshire Avenue
Downey, CA 90241
Subject: RFQ No. 23-002 - Statement of Qualifications for On -Call Professional Civil Engineering Services Dear Mr. Baumgardner,
The City of Downey is seeking qualified consultants to provide On -Call Professional Civil Engineering Services for the completion of preliminary engineering and final design plan specifications and estimates for street improvements and intersection widening, pavement and infrastructure rehabilitation and reconstruction, water, sewer, and stormwater infrastructure improvements, water well and water treatment improvements. The project also includes streetscape enhancements, "green street" projects, drainage infrastructure, and sidewalk, curb ramp and other pedestrian circulation improvements.

Willdan Engineering (Willdan) has been providing consulting engineering services for municipal public infrastructure design for over 59 years and is well suited to provide many of the services requested. Willdan has experience working for the City of Downey and adjoining cities and relationships with all stakeholders in the area. Since 1981, Willdan has delivered on -call civil engineering, on -call traffic engineering, water system repair and improvement, sewer improvement and rehabilitation, well, geotechnical testing, code enforcement, construction management and inspection, pavement rehabilitation, and plan and map checking services to the City of Downey. We are currently an incumbent on the City's existing On -Call Civil Engineering and Traffic Engineering Services contract, where we have demonstrated strong performance on a number of task orders. As a multi -disciplinary firm, we have a full complement of resources to provide additional staffing as well as technical support and research.

Willdan has provided engineering services to the County of Los Angeles, Los Angeles County Metropolitan Transportation Authority, and many of the cities located within the County with on -call consultant and project services for all types of projects, including, but not limited to, civil and traffic design, transportation planning, design of capital improvement projects, landscape architecture, surveying, geotechnical, construction management and inspection, plan review, building and safety and environmental planning.

Willdan currently provides full-time and as -needed traffic engineering services to 42 cities throughout Southern California, including the cities of Arcadia, El Monte, La Canada Flintridge, La Puente, Rosemead, and West Covina, in the San Gabriel Valley. Willdan has completed more than 30,000 traffic and transportation engineering projects since the 1980s, when our traffic and transportation group was founded. Our traffic engineering team specializes in providing all facets of traffic engineering and transportation planning to governmental agencies. Services including complete streets, first/last mile and active transportation, pedestrian planning, bikeway design, traffic signal design and optimization, intersection safety improvements, street rehabilitation and landscaping projects. Our understanding and knowledge of design is enhanced by our familiarity with Caltrans and local standards, guidelines, and procedures.

Our proposal submitted shall remain valid for a period of one hundred eighty (180) days from the date of submittal. Willdan accepts the terms and conditions contained in the City's Professional Services Agreement. Willdan possesses the required insurance covering professional liability, general liability, workers compensation, etc. at the time of submitting this SOQ.

Respectfully submitted,
LNU I I W67-11T Fa►' ► �
Vanessa Munoz PE,
President/CEO
714,940, 3U9 1 800,424,9144 1 fax. 714,940,4920 1 2401 East Kata[Ia Avenue, Suite :300, Anaheim. California 92806 1 www.wilid an.E-.om

1. Management and Organization.........................................................................................................................1 a. Executive Summary........................................................................................................................................... 1 b. Management Team and Organization.............................................................................................................. 5 c. Relevant Projects............................................................................................................................................... 6 d. References........................................................................................................................................................ 8 e. Change Order Data.......................................................................................................................................... 11 f. Managing Multiple Task Orders.......................................................................................................................12 g. Project Management Toolkit........................................................................................................................... 12 h. Fee Schedule................................................................................................................................................... 12 2. Team Processes and Resources.......................................................................................................................15 a. Planning Philosophy........................................................................................................................................15 b. Organizational Structure.................................................................................................................................15 c. Management Plan...........................................................................................................................................17 d. Project Controls...............................................................................................................................................18 e. Additional Data............................................................................................................................................... 20

3. Supplemental Information...........................................................................................................................21 Insurance............................................................................................................................................................. 21 Litigation............................................................................................................................................................. 21 AppendixA - Resumes......................................................................................................................................... 22 �y Statement of Qualifications for On -Call Professional Civil Engineering Services - RFQ No. 23-002

a. Executive
Willdan Engineering (Willdan), a California corporation since 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to
nationwide clientele through three subsidiary firms —
Willdan Engineering, Willdan Energy
AMLSolutions, and Willdan Financial Services —
that offer a portfolio of diversified
strengths. Throughout our history,
lquar Willdan has been a consistent industry
leader providing all aspects of municipal,
infrastructure, and transportation engineering; program management; financial consulting; municipal planning;
environmental; energy -related services, along with a full complement of related disciplines. Dedicated to providing public agencies with reliable, quality, and cost-effective services, Willdan merges sound solutions with a solid respect for the fiscal responsibility faced by local agencies and the concerns of affected communities. This approach has proven responsive to the most challenging budget, schedule, and aesthetic requirements. It is a contributing factor to our industry reputation and our company growth. Willdan addresses the varied demographics of our public agency clients through focused, specialized services offering solutions tailored to the unique goals and visions of each agency.

Willdan's understanding of public agency needs and issues is unique in the industry. In addition to the significant portion of our staff that have served in public agency management positions prior to joining Willdan, Willdan has had numerous assignments with over 90% of the cities and counties in California for building officials, city engineers, county engineers, county roads supervisors, planning directors, traffic engineers, and other public agency staff members. The diversity of our staff's experience is an added value to our professional services.

Willdan has the financial strength, resources, qualified staffing, and wherewithal to complete all projects undertaken due to our strong, dependable reputation and a stable client base that continues to expand through repeat customers, referrals, and new service areas.

Willdan's corporate -wide staffing resources have grown from 637 in 2014 to over 1,500 employees in 56 offices nationwide. Our corporate headquarters is located at 2401 East Yeam
0 Million
1,
PU13LICLY NASDAQ'
TPADEQ
w LDN

COMPANY
Katella Avenue, Suite 300 in Anaheim, California. Our City of Industry office will be the primary office for execution of this service; however, technical staff may be pulled from any office as needed. The firm's size and organization enable staff to efficiently communicate individual project challenges and goals companywide, thus capitalizing on all Willdan's resources to deliver the highest quality and most cost-effective product. Location information for all our offices can be found on our website. Financial information is issued quarterly and can be found on the Investors page.

As-needed/on-call engineering services are Willdan's foundation. Our staff includes former public agency or contract agency staff. Therefore, we understand the importance and purpose of as -needed contracts and are very familiar with the processes and procedures for such services. Within the last seven years, Willdan currently has task orders for more than 200 as -needed/ on -call contracts. This experience and the relevant experience of our dedicated and available key personnel are what best suits Willdan to provide the City with as -needed services. Our history of working with as -needed contracts has prepared our staff well to respond to all requests for services in a positive, efficient manner. Our firm's commitment to responsive service and successful project delivery has given us a reputation as a firm that can be trusted to listen, and to deliver a product our clients envision and embrace.
�y Statement of Qualifications for On -Call Professional 00 Engineering Services - RFQ No. 23-002

Civil Engineering Services
Willdan's highly trained and experienced civil engineering staff is supported by technical experts in various r5o" disciplines throughout the company. As a result, Willdan offers a range of expertise that only a large firm can provide. Willdan's civil design expertise includes transportation engineering; hydrology, drainage, flood control, and water/wastewater engineering. The firm's team of engineering professionals combines practical knowledge and technical expertise to develop solutions that are unique and customized to each need. With an extensive staff that includes civil, structural, traffic, and bridge engineers, Willdan has designed numerous types of transportation facilities, has managed transportation projects from initial project analysis through final design and construction, and has prepared pavement investigation design reports, pavement failure investigation reports, and pavement management system reports.

Willdan's design personnel serve as contract county/city engineer and client program managers — often in charge of formation and implementation of client capital improvement programs. Our civil engineers offer a full complement of roadway and highway program/project management and administration, and project design. Improvement services entail feasibility studies (site evaluation/grading/earthwork); project studies and reports; preliminary and final design; erosion control and site remediation; storm water management; NPDES compliance; utility conflict, ADA, and value engineering analyses; cost estimating and scheduling; and constructability review. Project improvements encompass grading, drainage, roadway widening, pavement management/rehabilitation, water, sewer, major highway, culverts and channels, bridges, and structures. Willdan has in-house CASp specialists to provide needed design and technical support for ADA-related Improvements.

Structural Engineering Services
Willdan provides complete structural engineering design, analysis, inspection, and evaluation of structural systems related to transportation -related infrastructure. Our experienced staff performs bridge advance planning studies and analyzes and designs bridges, sound walls, and retaining walls. They possess in-depth knowledge of all federal, state, and local criteria and methodologies for preparing project development documents, design, construction documents, and processing designs through Caltrans Local Assistance.

Traffic and Transportation Engineering
Willdan's traffic engineering experience and expertise covers all facets of traffic engineering and planning, including city traffic engineering, traffic analysis, design, and management. In addition to our proven expertise in traditional design services such as signing, striping, and traffic signal and street lighting design, our traffic engineers are skilled in sophisticated computer -based applications such as arterial corridor and network signal coordination studies. They are proficient in traffic impact analysis and evaluation of transportation systems management, transportation demand management, and intelligent transportation systems strategies. Willdan's traffic engineers are experts in conducting traffic surveys and data collection, investigating motorist and vehicle characteristics, identifying, and making recommendations on traffic safety and utilizing traffic laws and enforcement to determine traffic signal timing, and evaluating highway operations. Willdan prepares traffic engineering designs to warn, regulate, and guide traffic. We develop geometric design and channelization, traffic signal and street lighting plans, parking lot designs, and traffic control plans.

Willdan specializes in providing traffic engineering and planning services to governmental agencies. Our services range from responding to citizen complaints to designing and managing multimillion -dollar capital improvement projects. Our front-line knowledge and understanding of local road and traffic conditions are the cornerstone of our services. Willdan's traffic engineering staff applies state-of-the-art concepts to confirm the adequacy of transportation facilities, to determine the need for traffic control devices, and to ensure the safe and efficient operation of the transportation system.

Hydrologic Engineering Services
Willdan has expertise in all aspects of the municipal, construction, and industrial general National Pollutant Discharge Elimination Systems (NPDES) permits, hydrology, drainage, and flood control — ranging from local and regional drainage and flood control improvements to hydraulic and sediment transport analyses of major rivers. Quality engineering solutions in drainage and stormwater management have been one of the primary elements of Willdan's municipal and public works experience. Our expertise encompasses design of major flood control improvements, large earthen dams for debris control, peak flow reduction facilities, and storm drain improvements throughout California. Our stormwater engineering services include hydrology & hydraulics reports; retention and detention; debris control dams; peak flow reduction; storm drainage studies; master plans; and flood control works design and permitting. Our staff of highly skilled specialists utilizes the most advanced methodology to optimize design and enhance cost effectiveness.

Statement of Qualifications for On -Call Professional 2' 00 Engineering Services - RFQ No. 23-002

Geotechnical Engineering
Willdan provides a full gamut of geotechnical studies, engineering geology, and materials testing and inspection, including subsurface exploration, geologic and seismic hazard assessment, soil testing, engineering and pavement 74 analyses and designs, construction support (soils and materials testing and inspection), slope stability and am settlement analysis, earthquake and seismic hazard analysis, and other special studies. Over the years, Willdan has successfully assisted our clients in completing projects in the areas of geotechnical engineering, engineering geology, and materials testing and inspection. Willdan maintains a full -service soils and material testing laboratory. Our laboratory is certified by the California Department of Transportation, Division of State Architect, the City of Los Angles and AASHTO Materials Reference Laboratory (AMRL). We also participate in the AASHTO Materials Reference Laboratory (AMRL), Cement and Concrete Reference Laboratory (CCRL), and Caltrans Proficiency Programs.

Environmental Planning
Willdan has a prolific history of providing environmental planning services to cities and counties throughout -` California. Willdan's planners prepare all necessary environmental documentation, as required by CEQA and/or NEPA, for public and private projects. Entitlements include, but are not limited to, general plan amendments, code amendment, rezones, tentative subdivision maps, conditional use permits, design reviews, and specific plans. We have the capability, experience, and expertise to prepare NEPA environmental documents for projects that are federally funded, implementing federal oversight NEPA guidelines, such as the Preliminary Environmental Studies form required by Caltrans Local Assistance, statutory worksheets, and environmental assessments/findings of no significant impacts for projects funded through Department of Housing and Urban Development, Community Development Block Grant, and HOME Investment Partnerships programs.

Utility Investigation and Locating
Utility coordination — a critical path activity from design through construction — involves subsurface utility hmengineering, conflict analysis, communication, and cooperation with utility owners regarding project requirements, and construction observation or inspection of utility relocations. Successful coordination begins with early contact between individual utility owners and the project team. Willdan's utility coordination staff members routinely conduct discussions with agency staff and utility owners to ensure all stakeholders are aware of utility conflicts and assist with utility relocation. Our utility coordinators are knowledgeable in effectively identifying existing utilities, providing timely notification, and anticipating and resolving potential conflicts on plans and specifications. They are keenly aware that utility identification and location are crucial to project planning and development and are essential to saving time and money and keeping a project schedule on track. Our staff is adept at detailed identification and notification processes required for a myriad of project types.

Landscape Architecture
Willdan's landscape architecture services entail planning, design, management, and nurturing of built and natural environments. Our landscape architects are well versed in planning, designing, and improving built and natural environments that can be enjoyed by whole communities. Our designs incorporate art, environment, engineering, architecture, and sociology for improvements such as parks/playgrounds, school/college campuses, neighbor and commercial streets, major thoroughfares and arterial roads, trails and paths, civic buildings such as community centers and city halls, commercial centers, habitat and vegetation restoration, and other projects that strengthen the community and the surrounding environments. Our landscape architectural team members offer extensive knowledge in landscape architecture design principles, natural systems, plant materials, construction techniques and materials, graphic arts, computer applications, and ecology. They collaborate with urban planners, civil engineers, architects, construction managers, environmental scientists, hydrologists, surveyors, and others to mitigate aesthetic, physical, legal, ethical, functional, and ecological challenges and ensure code compliance with a focus on site analysis, user needs, programming, site design, landscape preservation, land management/reclamation, water conservation, and arboriculture. With their combined experience in almost 70 major parks, mostly in California, our landscape architects offer an essential array of services and expertise that adds long- term value to projects and communities.

Familiarity with Caltrans Local Assistance Procedures/Grant Administration Willdan is thoroughly familiar with regulations pertaining to project delivery requiring expenditures of federal, state, county, and local funds, including:

F9 Congestion Mitigation and Air Quality (CMAQ)
Statement of Qualifications for On -Call Professional 3' Cavil Engineering Services - RFQ No. 23-002

® State Transportation Improvement Program (STIP)
• Arterial Highway Rehabilitation Program (AHRP)
* Surface Transportation Program Local (STPL)
Safe, Accountable, Flexible, Efficient Transportation Equity Act (SAFETEA-LU) Highway Bridge Program (HBP)
State Gas Tax
Highway Safety Improvement Program (HSIP)
® Active Transportation Program (ATP)
® State Revolving Funds (SRF)
Various other grant and funding sources
This knowledge is critical in executing projects funded by federal or state programs that have special permitting and reporting requirements. Willdan routinely utilizes Caltrans LAPM and has coordinated, prepared, and submitted all necessary documentation to Caltrans/FHWA to assist local agencies in securing federal authorization and obligation of funds (E-76) for projects. When requested, Willdan has prepared funding applications, award packages, invoices, and other required documentation. Willdan has experience preparing and processing various Caltrans forms for local agencies, including state and federal funding forms, checklists, invoices, and reports of expenditures. We have assisted local agencies at various stages of state- and federal -funded projects, from the initiating request to final invoicing. We have enhanced our abilities in this area with the addition of several former Caltrans staff to Willdan's pool of technical resource staffing. In addition, Willdan team members maintain quality relations with Caltrans' District Local Assistance. Willdan has coordinated, prepared, and submitted all necessary documentation to Caltrans/FHWA to assist local agencies in securing federal authorization and obligation of funds (E-76) for projects. When requested, Willdan has prepared funding applications, award packages, invoices, and other required documentation. Our detailed submittals for authorizations to proceed with construction and preceding phases, including engineering plan certifications, have earned us a reputation for accuracy and completeness and have given Caltrans' staff confidence in our capabilities. In addition, Willdan has experience preparing and processing various Caltrans forms for local agencies, including state and federal funding forms, checklists, invoices, and reports of expenditures. With numerous completed projects and more than a dozen in progress, Willdan has assisted local agencies at various stages of state- and federal -funded projects, from the initiating request to final invoicing. We have enhanced our abilities in this area with the addition of several former Caltrans staff to Willdan's pool of technical resource staffing. In addition, Willdan team members maintain quality relations with Caltrans' District Local Assistance.

Willdan has been providing Geographic Information Systems (GIS) services to public agencies for over 30 years. goThe Willdan GIS Group supports disciplines in municipal planning, public agency accounting and financing, geotechnical engineering, environmental engineering, land surveying, traffic analysis, transportation planning, public safety solutions in emergency response and disaster management throughout the Willdan Group of Companies (WGI). We perform GIS analyses of civil infrastructure for use in planning and design. We prepare base mapping for engineering design projects and convert them to CAD format for use in Autodesk Civil 3D and MicroStation. We routinely convert CAD drawings to GIS format for analysis of sewers, storm drains, water distribution systems and other civil infrastructure. Willdan uses ArcGIS Desktop 10.8.2 Standard and Advanced licenses, ArcGIS Pro 2.9.3, the ArcGIS Spatial Analyst Extension, 3D Analyst Extension, and ArcGIS Online. We also use Autodesk Civil 3D 2021 and Bentley MicroStation VBi.

Flrm's Financial Health
Willdan's financial health is strong, and as a 60-year-old publicly traded company our financials are transparent, audited and published quarterly. Over the past four quarters ending in March 2023 the company has generated $38 million in Adjusted EBITDA and $30 million in cash flow from operations on $456 million of revenue. Our balance sheet is supported by a five - member bank syndication providing approximately $100 million in term loans plus an additional $50 million line of credit. Our cash balance at that date was $13.6 million. Our integrated financial management systems provide us the tools to manage cash flows and financial performance over more than 2,000 active projects in our system, and many of those projects include multiple thousands of individual customer installations under a single utility or municipal contract. Willdan has the financial wherewithal to effectively and efficiently handle the volume of projects you expect to produce. �y Statement of Qualifications for On -Call Professional 4' 00 Engineering Services - RFQ No. 23-002

® Management Team and Organization
Willdan Engineering's corporate
management is shown in the adjacent
organization chart. Our firm's success is
directly attributable to the direct
involvement of our executive team on our
major programs.

Willdan Engineering's President and Chief
Executive Officer Vanessa Munoz serves as
Willdan's client champion and will work
closely with our proposed Principal-in-
Charge/Quality Assurance Manager
Tyrone Peter, PE, to ensure the proper
resources and levels of expertise are
available to this contract and that task
order teams are right -sized to deliver the
highest quality of expertise, cost
effectively and efficiently, to this contract.

Vanessa Munoz, PE, TE
PIesld-t & ChW Exux A— Off—,
Patrick Johnson, PE, CBO Tyrone Peter, PE
Dkectnr Director
Albert Brady, CBO Jeffrey Lau, PE, TE, ENV SP
Deputy Dlr-ior' Deputy Dr t�
Autumn Wellman, CBO Steven Sacs, AICP, CPM
Deputy Director Deputy Dir tw
Adel Freij, PE
Director
Roxanne Hughes, PE
Deputy Drectw
Christopher Baca, RCI Jonathan Mitchell,PE
Dir-tor Director
Michael Bustos, Pe ENV SP --- -- ---
Deputy Drcctor
Salvador Lopez Jr.

Dvaoto
Jennifer Maria
Deputy Director
Willdan Engineering Corporate Organization
Mr. Peter is Willdan's Director of Engineering and brings significant qualifications to this contract, as summarized below. He has selected Raphael Casillas, PE, as Project Manager for your program. Mr. Casillas is a licensed civil engineer with experience that covers all aspects of public works civil engineering. He has a superior record of performance on highly relevant projects in the City's scope of work. The organization and qualifications of the key staff and technical support staff assigned to the City of Downey are presented in Section 2. Resumes for our key staff are provided in Appendix A.

Vanessato , PE, T
President, Willdan Engineering
Education j Credentials
BS, Civil Engineering I Civil Engineer, California No
No. 2341, Exp. 6/30/24 1 25 Years' Experience
67583, Exp. 6/30/25 1 Traffic Engineer, California
Experience that benefits the City:

Accomplished engineer with 25 years of multi -discipline and multi -agency traffic and transportation project experience
Has designed over 1,000 signalized intersections and supervised completion of over 2,000 projects for a variety of large- to small-scale projects.

Executive -level client champion
Tyrone Peter, PE
Principal-in-Charge/Quality Assurance Manager
Education i Credentials
BS, Civil Engineering I Civil Engineer, California No. 81888, Exp. 3/31/24 1 17 Years' Experience Experience that benefits the City:
• Depth of civil engineering design and project management experience and knowledge • Hands-on experience with infrastructure, CIP, and other municipal improvements, including alternative studies and approaches
Fosters interagency collaboration.
�y Statement of Qualifications for On -Call Professional 5' 00 Engineering Services - RFQ No. 23-002

Rafael Casillas, PE
Project Manager
Education I Credentials
BS, Public Administration I Civil Engineering (196 units) (Architecture I Civil Engineer, California No. 68234, Exp. 9/30/25 131 Years' Experience
Experience that benefits the City:

Vast experience managing local municipal agency capital improvements for public facilities, roadways, water systems, sewer mains, storm drains, and traffic signals systems Highly adept with project schedule management, quality and project budget control, accurate construction estimates, and construction support
Strong history with federal, state, and local grant -funded projects Resumes of our management and key staff are included in Appendix A.

Subconsultants
Willdan provides comprehensive engineering services and does not require subconsultants to complete this contract. However, our firm has longstanding partnerships with a broad array of specialty DBE subconsultants and is fully prepared to partner to meet the City's local, state and federal DBE requirements throughout the term of this contract. ® Relevant Projects
Below is a brief summary of our experience in the Los Angeles County area providing the requested services:
40( Statement of Qualifications for On -Call Professional 6, Civil Engineering Services - RFQ No. 23-002

ilk 's alb Projects
Over the past 59 years, Willdan has provided municipal services to more than 400 municipalities, for projects involving a broad array of disciplines. The following summarizes Willdan's relevant on -call services experience performed for various clients.

General Engineering Services, City of Paramount, 1980 to Ongoing Willdan has provided general engineering services to the City of Paramount for over 40 years and presently serves as city engineer and water engineer. In addition to providing extension of staff services, Willdan has provided traffic engineering, assessment engineering and district formation, public works permits/inspection, development review, CIP design and construction management/inspection, CDBG administration, grant writing, and NPDES services. These services encompass — but are not limited to — study and report research and preparation; plan, specification, and cost estimate preparation; funding source and availability consultation; citizens' request and complaint investigations/resolutions; development impact studies; plan checking; City staff, commissions, and council report preparation; staff, commissions, and council meeting attendance and participation; and City department coordination to implement desired City improvements and updates.

As -Needed Engineering Services, City of Polling Hills Estates, 1983 to Ongoing
Willdan has been providing engineering services to the City of Rolling Hills Estates for over 38 years, and presently serves in the capacity of City Engineer, Building Official, and City Traffic Engineer. Willdan is currently providing civil engineering design, traffic engineering design, construction management, development review, pavement engineering, labor compliance, plan check services, landscape architecture, and surveying services throughout the City of Rolling Hills Estates.
�y Statement of Qualifications for tin -Call Professional Civil Engineering Services - RFQ No. 23-002

As -Needed Engineering Services, City of Inglewood, 2003 to Ongoing Willdan has been providing as -needed engineering services for the City of Inglewood since 2003. Services include civil and traffic engineering services for various capital improvement projects such as ITS Phase IV Improvements; La Brea Avenue TSSP; annual traffic signal improvements, and Metro/Crenshaw/LAX light rail improvements. As part of the on -call traffic engineering services, Willdan's staff attend meetings, coordinate with other consultants, develop studies and construction contract documents to implement the City's improvements projects.

On -Call Engineering Services, City of Lakewood, 1to Ongoing For over 20 years, Willdan has been providing engineering design, construction management and inspection, project management, development review, pavement engineering, funding administration, landscape architecture, surveying, and geotechnical engineering services throughout the city. These services encompass — but are not limited to — study and report research and preparation; plan, specification, and cost estimate preparation; funding application research, preparation, and submittal; citizens' request and complaint investigations/resolutions; development impact studies; City staff, commissions, and council meeting attendance.

City Engineer r and Traffic Engineer, City of Los Alamitos, 1to Ongoing Willdan is providing as -needed engineering services to the City of Los Alamitos. As part of our extension of staff services for contract City Engineer and contract Traffic Engineer, Willdan provides review and supervision of engineering activities, including preparing plans, specifications, and estimates for capital and other improvement projects. We provide subdivision plan checking; contract administration; construction inspection; compliance with federal, state, and local laws and ordinances. We assist City staff with establishing departmental policies.
d. References
Experience with City
Willdan has provided professional services to Downey since 1981, when we began our plan check and map check contracts. The chart below illustrates that our projects for Downey over the past three years cover the spectrum of municipal civil engineering requirements and specifically the scope of work of this On -Call Professional Civil Engineering Services contact.

Statement of Qualifications for On -Call Professional 8 Civil Engineering Services - RFQ No. 23-002

Willdan has extensive experience providing expert design services on projects with similar scopes of work to the City of Downey's On -Call Engineering contract— including grading, drainage, roadway, water, sewer, state highway facilities, bridges, and structures, to name a few. To ensure a unified, cohesive, effective, and efficient approach, Willdan has in-house capabilities in a full spectrum of support functions, including right-of-way, utility relocation, geographic information systems, public participation processes, and interagency coordination. The reference projects on the following pages represent our most relevant examples of contracts.

STREETLITATION, City of Buena Park, Califolmia
Willdan provided engineering design services for the
preparation of plans, specifications, and cost estimates (PS&E), traffic control plans, pavement engineering, and utility coordination for the pavement rehabilitation of Malvern Avenue from West City Limits to East City
Limits, approximately 1.75 miles. The project
improvements included pavement rehabilitation, curb
and gutter replacements, sidewalk repair, upgrade of
curb ramps to be ADA-compliant, driveway repairs,
replacement of slotted cross
gutter and spandrels, thermoplastic striping, and signage. Willdan also evaluated bicycle facilities and installed Class II bike lanes while maintaining existing on -street parking and roadway capacity. The objectives of the project were to enhance pavement conditions, improve existing drainage issues, address accessibility definitions, and improve safety for all roadway users. Improvements for the project include pavement rehabilitation on roadways segments; parkway improvements, such as reconstruction of existing damaged and uplifted concrete sidewalk, cross gutter drainage improvements, curb and gutter, Class II bike lane additions, and drive approaches. Curb ramps are to be installed or reconstructed to ensure compliance with ADA requirements, as well as design survey and utility adjustments, pavement assessments, signing and striping, and replacement of traffic loops. ASCE Outstanding Bikeway and Trails Project Award Winner.

Relevance to Do ney's Scope of Work:

Street improvements and
intersection widening
Sidewalk, curb ramp and other
pedestrian circulation improvements
�a
Pavement and infrastructure
rehabilitation and reconstruction
1 "Green street" projects
v Streetscape enhancements
Water, sewer, and stormwater
Co Drainage infrastructure
Schedule:
0 2022 - 2023
Constructed Projects Implemented:

H Malvern Street Rehabilitation
ON-CALL2. ENGINEERING SERVICES, City of Pi1Rivera,California Willdan is providing On -Call Engineering Services to the City of Pico Rivera. Engineering services provided include:
respond to resident/business concerns, development
review, preparation of traffic and parking demand study scopes, review of traffic and parking demand studies,
�y Statement of Qualifications for On -Call Professional 9 Civil Engineering Services - RFQ No. 23-002

Relevance to Downey's .Scope of Work:

Street improvements and
intersection widening
Sidewalk, curb ramp and other
pedestrian circulation improvements
Pavement and infrastructure
rehabilitation and reconstruction
a "Green street" projects
Streetscape enhancements
Water, sewer, and stormwater
# Drainage infrastructure
.Schedule:
0 2021- Ongoing
Constructed Projects Implemented:

Citywide Street Resurfacing
City Hall EV Charging Stations
Citywide Slurry and Cape Seal
® Whittier Blvd Underpass
Improvements
ON-CALL3. ENGINEERING SF I F, City of Paramount, California Willdan is providing civil engineering, traffic engineering, agency engineering, landscape design services, survey,
contract administration, construction observation, utility coordination, federal labor compliance, pavement
engineering, public works permits/inspection,
development review, CIP design/inspection, CDBG
administration, grant writing, and NPDES. Willdan has
overseen the design and construction of more than $15
million in water system improvements for the City,
including the recent design and construction of two new wells. Other notable projects include the Railroad At -Grade Crossing Treatments at Paramount Boulevard/ Rosecrans Avenue project, which involved providing PS&E services for the removal of multiple at -grade Union Pacific Railroad crossing signals, and the Roundabout Design — lefferson/Bixler and Madison/Virginia project, which involved providing PS&E services for the construction of various traffic circles.

Relevance to Downey's Scope of Work:

Street improvements and
intersection widening
Sidewalk, curb ramp and other
pedestrian circulation improvements
Pavement and infrastructure
rehabilitation and reconstruction
"Green street" projects
0 Streetscape enhancements
Water, sewer, and stormwater
+ Water well and water treatment
improvements
Drainage infrastructure
Schedule:
0 1989 - Ongoing
Constructed Projects Implemented:

Arterial Street Improvements
FY22-23
Neighborhood Street
Improvements FY22-23
. GLENOAKS BOULEVARD1-51P CYCLE 7 AND IlRESU11FACING IMPROVEMENTS HSIP- t , City of Sari Fernando, li ft rni
Willdan is providing preliminary and final engineering design services for the City of San Fernando's HSIP Cycle 7
improvements. The $2.1 million budget is comprised of $1.5 million Local Measure R funds, $97,846 CalRecycle funds, and $500,000 City utility funds. The design involves traffic signal modifications to protected/left turn phasing and non - landscaped raised doweled medians for the length of the turn pockets at Arroyo Street, Griswald Avenue, Grand
Boulevard, Maclay Avenue, Haring Avenue, and Orange Grove Avenue. The project involves 1.27 miles of street resurfacing between the east and west city limits. The project Improvements included street, water, storm drain, traffic signal, signing and striping design; topographic survey; potholing; utility coordination; NEPA/CEQA clearance; federal paperwork administration; geotechnical and pavement engineering; and public outreach. �y Statement of Qualifications for On -Call Professional 10 Civil Engineering Services - RFQ No. 23-002

Relevance to Downey's Scope of Work:

Street improvements and
intersection widening
Sidewalk, curb ramp and other
pedestrian circulation improvements
of Pavement and infrastructure
rehabilitation and reconstruction
Streetscape enhancements
Water, sewer, and stormwater
# Drainage infrastructure
Schedule:
0 2017 -- 2018
Constructed Projects Implemented:

Arroyo Street, Griswald Avenue,
Grand Boulevard, Maclay Avenue,
Haring Avenue, and Orange Grove
Avenue

1.27 miles of street resurfacing

5. 1)°Y OF INGLEWOOD, F 1151' 1' MILE IMPROVEMENTS, r 1 , Califorriia Willdan is providing professional engineering design services for First/Last Mile Improvement Project - Phase 1. We understand the * •'• City received a $6.5 million grant from Metro for the implementation of the First/Last Mile Improvement Project. This project encompasses complete street improvements on 13 streets/corridors as identified as r ,
pathway networks around of following three Crenshaw/LAX Line stations and one Green Line station: 1) Fairview Heights Station; 2) Downtown Inglewood Station; 3) Westchester/Veterans Station; and 4) Crenshaw Green Line Station. In general, the proposed improvements will include enhanced crosswalks, wayfinding signage, X bicycle lanes, bicycle sharrows, bus shelters, benches, trash cans, bike cut through diverter modifications, and ADA accessible curb ramps at the various project locations.

Relevance to Downev`s Scope of Work:
0 Sidewalk, curb ramp and other
pedestrian circulation improvements
® Change Order Data
Citywide Pavement
Rehabilitation, City of
Pico Rivera, CA
Bastanchury Median,
Yorba Linda, CA
of
Streetscape enhancements
4/12/21 - 12/21/21
4/17/23 — 2/9/24 est.

Schedule:
® 11/14/2022 — 12/31/2024
Constructed Projects Implemented:
® Complete street improvements on
13 streets/corridor
$447,224 $68,775 $515,999 $2,016,025
$107,217 -0- $107,217 N/A
Client divided the
project into two
projects
No change orders.
�N( SCaCement of Qualifications for On -Call Professional Civil Engineering Services - RFQ No. 23-002

f® Managing MultipleTask Orders
On -call and staff augmentation services have been the cornerstone of Willdan's business for over 59 years. We offer expert teams backed by the knowledge and experience of servicing over 200 active on -call contracts at any given time in a way that ensures strong performance and cost-effective, on -time delivery. Willdan's Project Manager Raphael Casillas is adept at managing multiple projects simultaneously, each with different deadlines and deliverables. His approach to managing time, resources, and quality effectively and efficiently — and his tools for managing projects simultaneously while maintaining high performance — are described below.
® Clearly Define Roles and Responsibilities. At the start of the contract and after the issuance of each Task Order, Mr.

Casillas will define staff and subconsultant roles and responsibilities for each scope of work element, noting different levels of involvement and authority for projects of different sizes and scopes. Mr. Casillas will set clear expectations, communicate effectively, and avoid role conflicts or overlaps. ® Prioritize and Delegate Work. Mr. Casillas and his Task Managers will identify long -lead activities, prioritize the most important and urgent tasks for each project, and delegate tasks to discipline staff whose core competencies best match the scope of work.

Communicate and Collaborate. Mr. Casillas will communicate regularly and clearly with City staff, stakeholders, and team members, and keep them informed of the project status, changes, and issues.

Review and Learn. Mr. Casillas will conduct regular and timely reviews of projects, evaluating performance and results and obtaining client feedback and satisfaction as a means to incorporate the lessons learned and best practices for future projects.

Section 2 describes the processes and resources that Mr. Casillas will implement as Project Manager to ensure high quality performance with superior results.
g. Project Management Toolkit
Willdan uses a variety of Internet -based tools for scheduling, resource planning, online collaboration, and reporting —from laptop and desktop computers installed at every workstation equipped with the Microsoft Office 365 software suite and Microsoft Project, to laptops, tablets, mi-fi, cellphones, radios, digital cameras for collecting data in the field. Our collaborative communication platforms include email, Webex, Microsoft Teams, and SharePoint. In addition, Willdan utilizes Deltek Costpoint to achieve project and financial management compliance with the changing requirements of our thousands of municipality clients. Costpoint provides unparalleled visibility and financial control and is compliant with Defense Contract Audit Agency (DCAA) for financial accounting and Defense Contract Management Agency (DCMA) for physical assets and audits. As a public company, Willdan undergoes stringent annual audits by an independent auditor. Willdan's project managers are adept at using Microsoft Project, Microsoft Excel and various scheduling software to manage their dynamic project activities for cost-effective and timely execution.

Scheduleh. Fee
Willdan's fee schedule on the following page provides serves as an example for the various types of projects represented in Section II of this RFQ.
�y Statement of Qualifications for On -Call Professional 12 Civil Engineering Services - RFQ No. 23-002

10/1012023
Project Fee
ias :. ;
.'suhtevk;
oirecro7 PkcY tt prajert
;. ,.. A+taneget Manager
PkYaha¢eC
Mwtyt= Peter tashtas
; a5kD§x PF ert " „
• � ll�!'�VII II III fllllllllllllllll
E-k.aaaa.W
`
De�tnr iC
, Rnyea.

A-b-oF
EPBier!
.,
"Ssmkar,
Se�dnt
DatiBnet
(Dreinage
urkgex
�
., llGiitg ;, PrindPeC Sanbr DtYutt
CwuAinsNSr `FM *-ntrvey ' bieettur.`besigrt
`STiNe Anal 'e - ratk
Mettaelcno Rnell" 9arrien}ns ' 4au"
;5enlar, PYinc1P?i
prcryect,
aCi
9yrclr . ,t�ida n
santar-. Xity
LaiMscax"
Aml
NPfiuyari . RukaLitta
pe"ciPat
planer
.

Sun
Diremy,
eeoteth
Rahfiarlcn
SexNbs
#ngindee hC
ceaierh
.: Mantagi,
Adttrin,
Aulgtarit
`'
,T wad
ours
, tahrak'
„ ;,
- O'Wd."ni ,
, , Radnb,:

T.A. '
,, .

Willdan's Fee Schedule for the On -Call Professional Civil Engineering Services contract is shown on the following page.

Statement of Qualifications for On -Call Professional 13 -1�4( Civil Engineering Services - RFQ No. 23-002

Schedule of Hourly Rates
Effective July 9, 2023 to June 30, 2026
"" For Non -Prevailing Wage Project *** For Prevailing Wage Project Mileage/Field Vehicle usage will be charged at the rate in accordance with the current FTR mileage reimbursement rate,. subject to negotiation.

Additional billing :classifications maybe added tothe above listing duringthe year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime will be charged at 1.5 times,. and Sundays and holidays,2.0 times the standard rates. Blueprinting, reproduction,. messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A sub consultant management fee of fifteen percent (15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid July 1, 2023thru.June 30, 2024, thereafter, the rates may be raised once per year to the value between the 12-month %.change of the Consumer Price Index for the Loss Angeles/Orange County/Sacramento/San Francisco/Sam Jose area and five percent. For prevailing wage classifications: the increase will be .per the prevailing wage increase set by the California Department of Industrial Relations.

Statement of Qualifications for On -Call 4
�y Professional Civil Engineering Services

a. Planning ii
Mr. Casillas will identify and plan key staff assignments to ensure efficient and effective project delivery for each project awarded under the on -call contract in accordance with Willdan's corporate quality standards. Mr. Casillas will discuss project -specific staffing needs and scheduling with assigned Task Managers. He will then meet with Mr. Tyrone Peter, PE, our Principal -in -Charge, to discuss project staffing needs. Mr. Peter will ensure company -wide resources are available to support the City's projects.

Mr. Casillas is completely committed to providing the staffing and resources required to complete projects on schedule with high quality deliverables. They will allocate a resource baseline of dedicated team members exclusively to this contract based upon our experience with similar contracts. To ensure we meet our commitments, labor projections for all projects are prepared.

These projections are aggregated by Mr. Peter to produce division -/office -/corporate -wide labor needs and identify staffing shortages or surpluses. Once Mr. Casillas has identified the staff required to complete the City's project, they will calculate the hours needed for each team member. These hour calculations are entered into our project staffing projection calculations on a weekly basis. If workload leveling is required to balance project demand with staff capacity, we will:

Address excess demand through staff overtime.

Redistribute other project workloads to reallocate experienced staffing resources to the City projects.

Augment staff with known independent specialists.

Implement combinations of above remedies.

This methodology enables us to effectively utilize available staffing resources with the appropriate expertise that aligns with individual project needs. Accommodating varying levels of work is made possible with efficient and timely project execution. To keep projects on track and under budget, Mr. Casillas will diligently implement project management controls to ensure project workloads are distributed to maximize available knowledgeable resources and thereby benefit the City's projects. These controls are based upon the Project Management Institute guidelines and encompass — but are not limited to:

Conducting strategy work sessions
* Utilizing issue, action item, and decisions logs
Directing critical -path, resource -loaded scheduling
® Discussing team performance — holding team members accountable b. Organizational Structure
Willdan offers a highly qualified team of professionals with the technical qualifications and diverse capabilities necessary to meet the as -needed services of the City of Downey — many of whom are currently assigned to the City's On -Call Civil Engineering Services contract. The individuals shown in the organization chart below have the capabilities and experience to respond immediately to the City's requests with superior results. The chart illustrates the reporting relationships and project roles for Willdan's team, along with a listing of available staffing resources and their respective disciplines. These staffing resources may be called upon to serve the City as technical support team members for projects assigned under the City's contract. Staff presented are representative of the caliber and quality of Willdan's entire staffing resources. This is far from an exhaustive list of our resources and is shown to assist the City in evaluating the caliber and depth of our staff.

Proposed Principal -in -Charge and Quality Assurance Manager Tyrone Peter, PE, brings experience on three of our reference projects including First Last Mile Improvements for the City of Inglewood — a $6.5 million project that encompasses complete street improvements on 13 streets/corridors as identified as pathway networks around of following three Crenshaw/LAX Line stations and one Green Line station. As Willdan's Director of Engineering, Mr. Peter brings a wealth of experience in the City's scope of work and the authority to deliver excellent resources to the City's contract throughout its term.

Statement of Qualifications for On -Call IS
�y Professional Civil Engineering Services

—
Our proposed Project Manager Rafael Casi|bs, PE, has extensive experience asaProject Manager and Lead Designer onmultiple on -call Civil Engineering and Traffic EngineehngcontmctsforthecitiesofRoUingHiUs Estates Inglewood, and Paramount (one of our reference projects). He also served as Lead Designer for a series of major street improvements for the City of Ridgecrest, CA over a seven-year period that included all /
aspects ofthe City ofDowney/sscope ofwork. Mr. [asiUashas selected ateam ofkey staff shown below to /
lead each ma or discipline for this contract. Each of our key staff brings significant qualifications and work experience in their respective discipline and have previously worked together on similar contracts. 9MEMEMBEM
Matthew Crim, PC, ENV SP
Joseph Bellonno, PE, QSD/P
mm���c��
w"manda, PE
Jeffrey Lau, PE, TE
n�Gandhi, PE, QSD/P
ww������
Chris Stone
mns�*',s
m,"mw�,�EwvS,
Ken Krieger
Ken Krieger
Jeffery Jensen
Ken Krieger
Rafael Ca.m°.,s
Sheila McCracken
Phillip Flores
Rafael mmn"s,,s
Christopher Kelley, PE, usDm
Bernardo Reyes
Ra"«,Sh"uowe"
Christopher Kelley, PE, ouD/P
n*mGandhi, PE, mwp
Danny Crawford, oop
Glenn `. Hale, csM.c,oc
Jennifer Shinn
Robert Burch
Chien -Chang Chen, PhD, PC, ���u�»m ��m��x�
GE����m=��pa Bryan Nguyen, mx
Joseph Ritchey Dawux"°n',u Carlos Espinosa
Resumes of our proposed project management and key staff are presented in Appendix A.

Aaron Cowen, PE
Richard Uhlmann
Matthew cn=PE, ENV S,
Statement mQualifications for On -Call 16

® Management Plan
Willdan will implement a uniform approach for projects consisting of conducting a kick-off meeting to discuss detailed project scoping and criteria, reviewing existing available record information, and the City goals for the project. Mr. Casillas will maintain communication with the City's Project Manager to communicate effectively, reduce misunderstandings and project conflicts, address project concerns identified during quality assurance and quality control and report regularly on the status of project milestones. Willdan's project management approach will be to monitor and contain costs for this project, meet schedule milestones, and deliver quality project bid packages. The strategies below will be implemented as part of our project management approach.

Work Plan: A work plan addressing staffing resources and assignments, scope of work, deliverables, budget, and 40 schedule will be developed and submitted to the City for approval. This plan — as approved by the City staff — will provide definitive direction to the project team.

M1Schedule A schedule defining each task needed to meet key milestone dates will be prepared and submitted to the City for approval. Using open dialogue with our team, the City's project staff, and stakeholders, Willdan will adjust as needed to meet the project delivery goals.

Meetings: Project team meetings will be held to facilitate informed discussions and decisions and build team consensus on solutions and action items. All team members will be informed through complete and accurate meeting minutes highlighting decisions, action items, and prompt follow-through.

Research and Development: A comprehensive and accurate base map with verified field conditions is critical to developing a design addressing potential conflicts. Existing record improvement drawings such as traffic signal, signing and striping, street lighting, and street improvement as-builts — together with photographs and field observations — will make up the resources used to compile the base mapping. This includes prompt utility requests to obtain necessary information regarding buried and overhead facilities.

Designs: A comprehensive and preliminary design incorporating topographic features, field reviews, and utility data is vital to effective design. Impact identification at this stage is critical to controlling construction costs and minimize construction delays. Construction cost estimates are routinely updated during the various task phases. Final design plans, specifications, and construction estimates will be implemented as soon as the preliminary design has been approved and pavement strategies have been reviewed and approved.

Services during Construction and As -Built Plans: Mr. Casillas and their assigned Task Managers will be available to the City during the bidding and construction phases to provide technical assistance as needed. Upon completion of construction and receipt of the contractor's and inspector's redlined control plan sets, we will review and clarify any apparent conflicts in as -constructed notations and prepare an as -built set of record drawings for the City's files.

Quality lrl alms ControlPlan
Willdan maintains a strict quality control program that includes peer review and constructability review of all design projects.

This process has served us well and is demonstrated by the amount of successful construction that has taken place because of Willdan design projects. The Willdan team's management approach has been proven on past projects to be effective in delivering design projects on time, within budget and to the client's satisfaction. Willdan conducts weekly meetings to discuss project planning, workload leveling, and assess critical staff assignments. For example, if a Willdan staff member has upcoming quality control responsibilities, no other assignments will be allocated to that person that would impede his/her ability to succeed in performing a critical design check or independent review.

Our Project manager's diligent implementation of project management controls such as strategy work sessions; issue, action item, and decisions logs; critical -path, resource -loaded scheduling; and other project management strategies based upon the Project Management Institute guidelines ensures projects are delivered on time and within budget — facilitating effective resource planning activities. Our project manager will also conduct performance briefings to discuss staffing and schedule needs and challenges and any project issues that require increases in staffing.

Statement of Qualifications for Can -Call 1
�y Professional Civil Engineering Services

® Project Controls
Willdan implements a coordinated process to ensure adequate time is dedicated to our on -call services, in conjunction with staff and office workloads. The manhour breakdown structure subdivides the work into manageable segments and is the basis for our project managers' project control plan. The structure is tailored to specific project needs, but generally has typical elements, including codes to identify work segments and engineering disciplines, weekly reports, and project resources schedule. Each project manager then updates the schedule. This simple system provides accountability for Willdan's payroll, billings, and progress reporting and serves as the basis for all cost -related project management data. Our on -time delivery methodology and project control system are designed to provide a coordinated effort between all task facets of a project in the framework of the pre -established master schedule, budget controls, and reporting system. Our project control system provides an objective measure of performance — integrating:

Progress Reporting
The submittal requirements and format for consistent monthly reporting of project costs and status will be C*1 confirmed with the City during the project start-up period. The status report will contain a project performance summary, action items, outstanding items to be resolved, updated schedule, and comparison and narrative of budgeted costs versus actual costs. Willdan will also be documenting the progress of employing sustainability principles throughout the design and construction phases to achieve ENVISION® certification upon project completion.

Staffing and Resource Management
Willdan will manage this project with a can -do attitude toward time and cost-effective planning and design services. Our project management philosophy revolves around early and frequent communication with project team members, including the City staff, subconsultants, and project stakeholders. The most effective management tool we will use is open and documented communication, especially when meeting tight project deadlines. Our Project Manager, Mr. Raphael Casillas, PE will ensure the project requirements are clearly understood and reinforced through frequent communication with the entire project team. The following is a brief outline of our management approach to delivering exceptional services to the City with a quality, cost- effective product. Mr. Casillas will use this approach to promote team communication, collaboration, and proper documentation in managing all phases of the project.
® Prepare a work plan that addresses staffing and assignments, scope of work, deliverables, budget, and schedule with milestones. The work plan provides definitive directions to the project team as agreed to by the City during the initial kick-off meeting.
® Conduct project team meetings, including the kick-off meeting, to facilitate informed discussions and decisions and team consensus on solutions and action items. All team members are kept informed through meeting minutes that highlight decisions, action items, and prompt follow-through. ® Consistently use project tracking tools, such as issues and decision logs, monthly progress reports, and schedule updates.
® Utilize effective communication mediums through a complete stakeholder contact list specifically tailored to facilitate face-to-face, phone, email, written document, and fax communications and project needs. Communication never stops.

Subconsultant Management Plan
One of Willdan's advantages over most of our competitors is that we offer nearly all the required engineering services with in-house experts and technicians. We do not need to hire and manage as many subconsultants as other firms do. However, we understand and support the Port's goals for Small/Very Small Business Enterprises.

Willdan has made a commitment to hiring disadvantaged, minority, women, and disabled veteran businesses whenever possible. We always strive to meet or exceed the goals set by our client agencies. Subconsultants will take all formal direction from our project manager. All activities related to the administration of the subconsultant agreements will be managed by our project manager. Mr. Casillas will review our subconsultants' progress on a weekly basis. All subconsultant work is included in our quality control reviews.

Statement of Qualifications for On -Call 18
�y Professional Civil Engineering Services

Cost Control
The budget control system is prepared in accordance with the work breakdown structure. The budget becomes the control against which performance is measured. The budget is time phased by combining project master scheduling data with budget data. Actual costs are compared with budgeted costs and variances analyzed.

Deviations between planned and actual cost can then be evaluated to forecast and control future work.

Beginning with electronic timekeeping, project hours are assigned to the appropriate tasks and subtasks and booked as work -in -process. Pre -bill reports are generated that identify the hours to be billed, along with any other direct charges for the project. This is the information used to determine each month's invoicing. Once hours and charges are billed, they are shifted from Work -in -Process to Accounts Receivable to ensure that billed hours are inactivated. Monitoring is easily accomplished through team member progress updates and comparisons between the scope of work, schedule, and budget.

Schedule Control
A critical path method master schedule will be prepared following the notice to proceed. The project schedule will identify major items of work to be performed and will be the vehicle for monitoring, controlling, and tracking progress. The schedule will be updated monthly to reflect actual and forecasted completions. This allows our project manager and Task Managers to anticipate and forecast potential issues and develop an advanced strategy to proactively mitigate challenges before they impact the schedule. If it is determined that a design or construction element is falling behind schedule, Mr. Casillas will meet with the respective team members, identify the problem, and see to it that extra support and effort are expended to bring the project back on schedule. Willdan will keep the City staff informed of the overall schedule, including advanced notification of any necessary adjustments or actions to get the project back on track. ® Mr. Casillas will monitor all project progress on a weekly basis and will use the below approach to maintain the project's schedule.
® Create a detailed project schedule outlining all tasks, including quality control efforts and tasks to be performed by the City staff, with completion dates necessary to achieve the overall schedule goal.

Assign staff with the appropriate level of expertise that can develop and deliver submittals correctly the first time and avoid costly rework.
® Frequently check -in with the City staff, Willdan team members, and subconsultant production staff to stay abreast of task progress and implement corrective measures to maintain the schedule. ® Conduct project team meetings to discuss task progress related to the schedule along with tasks means and methods to ensure the team remains on the identified path.

Develop thorough meeting minutes and hold team members accountable with specifically identified deadlines and decisions.

Constructability Review
Willdan's construction management team will perform a constructability review of the plans and specifications, including analysis of quantities and costs, check of construction phasing, full analysis of the contractor's schedule, and applicable requirements for federal funding and reimbursement submittals. They will also review the SWPPP to confirm that the contractor's plan meets QSP/QSD requirements and that all storm water permits are in place. Additionally, our construction manager will maintain a project -first philosophy with the contractor.

When this is achieved, construction is easy, straight forward, and accomplished with a minimum of issues. We are a team; and right is right and wrong is wrong for all parties. When this is established, it creates a fair environment for all and project success is achieved.

Quality Assurance and Control
Quality assurance and control procedures are critical to ensuring sound engineering practices and quality deliverables are produced for our clients. Willdan operates daily under a company -wide Quality Assurance/Quality Control (QA/QC) Program. In accordance with Willdan's QA/QC Manual, Tyrone Peter, PE, will serve as the project's Quality Assurance Manager. Project -specific quality assurance activities will be planned at the beginning of the project. Typical QA/QC activities include assigning the appropriate technical staff to the project, selecting the proper project technical approach, establishing a project schedule that meets internal Statement of Qualifications for On -Call 19
�y Professional Civil Engineering Services

Willdan and the City deadlines, and determining the proper level of QA/QC review. The four review levels for project deliverables are:
® Level 1— peer review only
Level 2 — peer review and editorial review (documents)
Level 3 — peer review, editorial review, and engineer review ® Level 4 — all elements of Level 3 plus additional reviews by specific technical experts The two major components of the quality assurance review are technical and communication reviews. A Level 3 review will be performed on engineering design plans, specifications, and cost estimate to ensure the design is sound, constructible, and appropriate for the intended use and to confirm deliverables meet the scope of work requirements. This process involves reviews by independent designers and the Project Manager prior to submittal for formal review under the agreed -upon project -specific quality assurance plan. Project documents, including letters and correspondence, are subject to a Level 2 review to ensure deliverables are reasonably organized, text and presentation are understandable and easy to follow, any required formats are followed, and there are no grammatical or spelling errors. All subconsultants are held to Willdan's high -quality standards and deliverables are included and reviewed as part of our quality assurance process. e. Additional to
. Letters e stl i
III illi��ilill�!�l��l 11111 1 Fill 1111111�1�11�11; 11�1�11111 1�1 11� I �111 s « • �.

Cesar Ortiz, •
City of Buena Park
Principal Engineer — Public Works,
Bt J"'ENAIWI)ARK
Malvern Avenue Rehabilitation Project
"I look forward to providing helpful feedback for your services. The Malvern project was one of the biggest projects the City has done in a long time & the first major bike lane project within the City. Our Council and City Manager had great appreciation for the final product."
"The City's very tight schedule was met and PS&E was comprehensive and complete per City standards. Issues encountered during construction were addressed promptly to avoid delay."
Cesar Ortiz, City of Buena Park
Citywide Resurfacing - Overlay and Reconstruction
"We appreciate Willdan's prompt responsiveness and flexibility to challenging issues as they arise." Gene Edwards, City of Pico Rivera
w Commitment to Professionalev I e t
Willdan has over 125 state -licensed engineers and we recognize the benefits of professional development and education to nurture innovation and creativity in our engineering and technical support staff. Our employees are provided with a number of company -provided benefits to that end — educational assistance, reimbursement for certification/licensing applications and Statement of Qualifications for fin -Call 20
�y Professional Civil Engdneering Services

updates, and other professional development opportunities such as attendance at conferences and ability to published technical papers and promote their engineering achievements through industry award nominations.

N Capacity and Capability
Willdan has more than 1,500 employees in 56 offices nationwide, including licensed engineers, program and construction managers, planners, and building and safety staff. We have completed various types of projects for over 90 percent of the cities and counties in California. Willdan's Southern California operations have a total technical staff of over 215 located in our Anaheim and Industry offices specializing in a broad array of municipal public works projects similar to Downey's scope of work including licensed engineers, program and construction managers, building professionals, and other skilled professionals. We can also call upon any of our national licensed engineers and technical specialists, if necessary, to successfully deliver projects. Our plan is to exclusively utilize our Southern California staff to provide immediate availability and the direct, local attention and knowledge that is required for the services sought by the City.

3. Supplemental Ia► •
As shown in the Certificate of Liability
Insurance below, Willdan possesses the
required insurance covering professional
liability, general liability, workers
compensation, etc. as described in Section

3.2.10 - Insurance in the sample Professional
Services Agreement.

Willdan Engineering has normal workers
compensation, auto and liability litigation in
the course of our daily operation and none
of the litigation materially impacts the
financials of our company or will impact the
performance of this agreement.

AC R CERTIFICATE OF LIABILITY INSURANCE °"T�'MM/°°"YY"
I.,_.... n/9i2ozs lol /27/2022

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERS), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policypes) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the Certificate holder in lieu of such endorsement s).

PRODUCER I.. CON IrDan Snee BTnkC ,LLC

ANNTEA T
CA Lieen$e #OF1.576'7
777 S. Figueroa Sit act, 52nd IF
PPONE 'Fax
C.NR.Ex11: (NC,Ng:

E-MmL
ADDRESS:

Los Angeles CA 90017
.......-.-- INF RER(S)AISOSSINGCOVERAGE _ NAID#
213-689-0065
NsuRERA:TravClerS Pro tCrt Casustt Co ofAmerica 25674

INSURED
Anh.ir
;Allied WOI IdSnrphro Li.S 11ton— CmnF24rt374
_ .....
50(118ilia.
t KaCla AE 300

INSURERC
AhCA 92806

NSURERO-
INSURERE �
INSURERE:..... ... .....

COVERAGES WILLOOI CERTIFICATE NUMBER: 18920642 REVISION NUMBER: XXXXXXX

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION

OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,

EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE ILTR TTPE OF INSURANCE —_ NUMBER
SO CY

BEEN REDUCED BY PAID CLAIMS
M �O�YI'YVV MMI�DOYYVYY n LIMIT
S
A X OOMME CIALGENESAILLAeNTY y N P-630-7C016289-FIL-22
IU9/2022 11/9/2023 EACH OCCURRENCE
15 1,000,000
'., CLAMSMAOE X; OCCUR '.. '.,
6AMAGETO RENTEDccumencoj .,1.$
PREM SET tE
],OOO,OOO .,.,
X ''. E B DefiLs lJSI1 ,.
,.. I MEDexP (APora oarsom_'.
$ 15 000
X Cont Li2(1 (nCi_ ',,
PERSgNALSADVIN4yRY
"'.i_5 I,OOoL,000
GERL AGGREGATE LIMT APPLES PER ''.

GENERAL AGGREGATE
S 2,000,000
POLICY X JECOT X LOC ',. ',,
",, PRODUCTS-COMWCPAGG
"„$ 2,000,000
"'. OTHER:
'', $
A Y N R10-7T1'119fi5A-22-43-Cr
M
LI/92I122 11/9/2023(.MOit "GELIP
$ 1.000,000 ....

XTAaNTY
ANY AUTO '', "',
BODILY INJURY(Per Person)

S XXXXXXX

OWNED SCHEDULED

AUTOS QNLY AUTOS
BODILY INJURY (P., ­nt)
j..
111111111
$ XXXXXXX
-__

HIRED NCNOWNEO
AUTOS ONLY AUTOS ONLY '', ",,
". PROPERTY DAMAGE
'', (P race tlenlj.$

XXXXXXX
.._
$ XXXXXXX
UMBRELLA UAB HOCCUR "', NOTAPPLICABI.1,
'', "', EACH OCCURRENCE
'i.I XXXXXXX
"'. EXCESS LWB CLAMS MADE'.
"', :AGGREGATE
',$XXXXXXX
OED RETENTION$
$ XXXXXXX
". WORKERS COMPENSATION
A A DEMPLOYERS' LASJA Y UB-710210SA2243-G
PEIi OTH
11/92022 1U9/3023 X STATUTE ER
YIN
R ETOoPARTNERIEXECUTVE
�,,,,, N/A

EL EACH ACC GENT
S ],000,OOO
ryOFFICERSMEa NHI MBER EXCLUDED? '
.E.L. DISEASE EA EMPLQVEE�.$
j OOO OOO
yyand
"'. DEDGRIPTION OF OPERATIONS below
iEL. DISEASE POLICY LIMIT
'',,$ 1 000000
S Arch&Eng Prof N Y 0313-5950
11/9/2022 11/9/2023 P l Clehn:S1,000,000
Aggrcgate:S2,000,000
DESCRIPTION OF OPERATIONS 1 LOCATIONS /VEHICLES (ACgRD 131, Adtlitional Remarks SCM1edule, "rheGCri Liability policy is CndorsectwaltabiankCt Additiosul ISM dErdor LaNa'rheaC'e—Il�L'bilityAtamobleLiability, red)
PoN "uA Liability and Wiakia,
Compeluntion policies nre eadocsed wikha bl,,,ket Waiver of SUI, gation 6ndrn'seTUrart.

CERTIFICATE HOLDER CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 18920642

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Willdan 1'Lngin"" '
240I E. Kalella Avenue, Suite 300
ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHOaaED REPR
V {
Anaheim CA 92806
01488.201nCGIRD CORPORATION. All rights reserved.

ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Statement of Qualifications for On -Call 21
Professional Civil Engineering Services

Appendix
S f •
Education: BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering Civil Engineerina, Muruaapoo Polvtechnic
Civil
17 Years
No. 81888, Exp. 3131124
Mr. Tyrone Peter is an accomplished civil engineer for multi -discipline and multi -agency infrastructure projects and is known for providing innovative, quality engineering services to ensure project delivery within budget and schedule. His years of experience managing and designing all types of public works projects provide a solid foundation to understand what is needed to deliver a successful project and make him the perfect fit for overseeing the entire project as well as specific civil engineering tasks. Mr.

Peter's comprehensive experience includes design of state highway, new street, street widening, street realignment, pavement rehabilitation, light rail and railroad, grade separation, flood control facility, water, and sewer projects. He has supervised feasibility study, project study report, project report, construction document preparation as well as grade certification issuance, construction administration, and construction inspection. He is proficient at managing large project teams with subconsultants and multiple technical disciplines.

Relevant Project Experience
Malvern Street Rehabilitation, City of Buena Park, CA. Civil Design Lead. Willdan provided engineering design services for the preparation of plans, specifications, and cost estimates (PS&E), traffic control plans, pavement engineering, and utility coordination for the pavement rehabilitation of Malvern Avenue from West to East City Limits, approximately 1.75 miles. The project improvements included pavement rehabilitation, curb and gutter replacements, sidewalk repair, upgrade of curb ramps to be ADA-compliant, driveway repairs, replacement of slotted cross gutter and spandrels, thermoplastic striping, and signage.

First Last Mile Improvements, City of Inglewood, CA. Civil Design Task Lead. Willdan is providing professional engineering design services for First/Last Mile Improvement Project - Phase 1. We understand the City received a $6.5 million grant from Metro for the implementation of the First/Last Mile Improvement Project. This project encompasses complete street improvements on 13 streets/corridors as identified as pathway networks around of following three Crenshaw/LAX Line stations and one Green Line station: 1) Fairview Heights Station; 2) Downtown Inglewood Station; 3) Westchester/Veterans Station; and 4) Crenshaw Green Line Station. In general, the proposed improvements will include enhanced crosswalks, wayfinding signage, bicycle lanes, bicycle sharrows, bus shelters, benches, trash cans, bike cut through diverter modifications, and ADA accessible curb ramps.

On -Call Engineering Services, City of Paramount, CA. Civil Design Task Lead. Willdan is providing civil engineering, traffic engineering, agency engineering, landscape design services, survey, contract administration, construction observation, utility coordination, federal labor compliance, pavement engineering, public works permits/inspection, development review, CIP design/inspection, CDBG administration, grant writing, and NPDES. Willdan has overseen the design and construction of more than $15 million in water system improvements for the City, including the recent design and construction of two new wells.

Santa Anita Active Transportation Project, City of El Monte, CA. Civil Design Task Lead. Willdan provided engineering design services for the preparation of plans, specifications, and cost estimates (PS&E) and related construction documents. The project improvements included pedestrian and bicycle safety enhancements, complete street elements, Class II bike lanes, Class III bike routes, bicycle video detection, countdown pedestrian signal heads, thermoplastic striping upgrades, ADA curb ramps, bike racks, transit stop and wayfinding improvements along Santa Anita Avenue, Tyler Avenue, and Ramona Blvd. The city also requested pavement rehabilitation and re -striping; and pedestrian access ramp improvement at all intersections per current ADA codes.

Lakewood Boulevard Regional Corridor Capacity Enhancement Project, City of Lakewood, CA. Supervising Engineer. Willdan provided design engineering services for complete green street improvements involving parkway widening and median improvements; Class I bike path in both directions; turn lanes; landscape planting and irrigation; overhead distribution and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reconstruction; street resurfacing; catch basin construction; storm water quality improvements to comply with Green Streets policy; and bike lockers, bus shelter, and traffic signal modifications. Services provided included civil, traffic, pavement, drainage, and geotechnical engineering.

Statement of Qualifications for On -Call 22
�y Professional Civil Engineering Services

Rafael Casillas,
w #
Project Manager IV
Project Ro�e: Project Manager
Education: BS, Public Administration, University of La Verne Civil Engineering (196 units), California State University, Los Angeles Architecture Studies, Phoenix Institute of Technology
Registration: Civil Engineer, California No. 68234, Exp. 9130125 Mr. Rafael Casillas is a qualified, capable, and motivated individual with a successful track record for project delivery. He possesses vast experience managing local public works departments and public sector capital improvement projects. Mr. Casillas' direct responsibilities involve overseeing local municipal agency capital improvements for public facilities, roadways, water systems, sewer mains, storm drains, and traffic signals systems. In addition to his design experience, he is highly adept with project schedule management, quality and project budget control, accurate construction estimates, construction support, and funding administration required for federal, state, and local grants. Mr. Casillas possesses expertise in supervising project teams consisting of civil designers, consultants, and contractors and is highly knowledgeable in local municipal codes, California Environmental Quality Act, and Subdivision Map Act compliance.

Florence Avenue Rehabilitation Downey, CA. Project Manager. Willdan provided professional engineering design services for the preparation of plans, specifications and estimates for the street improvements. The project limits are Florence Avenue from Tweedy Lane to Brookshire Avenue. The City of Downey is requesting that the following project features be included, but not limited to removal and replacement of deteriorated pavement including base if deemed necessary, grind and overlay including edge grind and cross fall correction as needed, mini grind and patching, crack sealing as needed, slurry sealing as needed, striping, signing, curb painting and pavement markings.

Lakewood Boulevard Capacity Enhancement Project, City of Lakewood, CA. Supervising Engineer. The project was identified in the Gateway Council of Governments Active Transportation Plan as a regionally significant project due to the Metro bus route enhancement between Lakewood Center and Pasadena, regional truck route designation, and regional access to Lakewood Center, Long Beach Airport, retail, colleges, and medical and employment centers. The approximate 1Y,-mile complete -/green - street improvements between the northern city limits and Del Amo Boulevard involved width modifications to Lakewood Boulevard to provide for a regional bicycle path in compliance with the Gateway Council of Governments Active Transportation Plan and sidewalk segment improvements to allow pedestrian access to various commercial establishments and Lakewood Center. Landscape Improvements and water conservation features were incorporated into the preliminary design. This project was funded by Los Angeles County Metropolitan Transit District Measure R Interstate 91/605 Hot Spots Expenditure Plan funds.

Walker Avenue at Florence Avenue Intersection Improvements and Widening, City of Bell, CA. The intersection improvements at Walker Avenue and Florence Avenue involved increasing the northeast turning radius (right -turn movement) and widening the easterly curb line on Walker Avenue. The scope encompassed AC pavement cold milling; ARHM overlay application; driveway approach, sidewalk, curb, gutter, and curb ramp removals and replacements; signing and striping; traffic signal modifications. 2020 Arterial Street Resurfacing, City of Paramount, CA. Arterial streets included Alondra Boulevard from Hunsaker Avenue to the Los Angeles River, Downey Avenue from the south city limit to Alondra Boulevard, and Orange Avenue from Rosecrans Avenue to the north city limit. The scope consisted of various street improvements, cold milling, rubberized asphalt overlay, curb ramp modifications, sign and pavement legend replacements, traffic signal upgrades, and miscellaneous concrete repairs.

Neighborhood Street FY 2020/2021 Improvements, City of La Puente, CA. The annual resurfacing improvements within city neighborhoods involved resurfacing over 16,000 feet of the local street system and reconstructing damaged sidewalks, driveways, curb, and gutter to improve surface drainage deficiencies. Curb access ramps were reviewed for compliance with current ADA requirements and were reconstructed or retrofitted with truncated domes as required.

Clarkson Improvements, City of Bell, CA. Project Manager. Willdan has generated plans, specifications and estimates (PS&E) for the Clarkson Avenue improvement project from Gage Avenue to Bell Place. The project incorporates protection of the existing parkway Ficus trees, reconstruction of the pedestrian sidewalks, improving line of grade for the existing on -street angled parking stalls, pedestrian enhancements such as benches and bike hitches, bike route signing and pavement legends and construction of new green street stormwater elements.

Statement of Qualifications for Can -Call 2
Professional Civil En&eering Services

Matthew Crim, PE, ENV SP
Associate Engineer I
Project We: General Civii Enginwering Lead
Education: BS, Civil Engineering, Cal Poly Pomona
Registration: Civil Engineer, California No. 94393, Exp. 3131125 Envision Sustainability Professional, Institute for Sustainable Infrastructure (ENV SP) No. 45380 Mr. Matthew Crim participates in infrastructure planning and the design and preparation of plans, specifications, and estimates of various types of public improvement projects including, but not limited to transportation, storm drainage, water and sewer facilities, and minor structures. He assists in the collection of engineering and survey data, the development of design and construction standards for public improvements, and the inspection of public works projects. He has designed curb ramps, driveways, parking lots, and street cross sections; and developed estimates for varying design projects. He has also designed and run models for vehicle movement down a proposed corridor. Mr. Crim has written specifications used in multiple cities for a variety of projects and applied standards to designs and to ensure things are to code throughout the design process. He has participated in the design of the master plans for sewage and storm drain systems, completing SWDR and SWPPP reports for multiple projects. He has analyzed watersheds and treatment methods for both existing and proposed conditions of pavement projects.

Relevant Project Experience
Lakewood Boulevard Capacity Enhancement Project, City of Lakewood, CA. Civil Designer. The project was identified in the Gateway Council of Governments Active Transportation Plan as a regionally significant project due to the Metro bus route enhancement between Lakewood Center and Pasadena, regional truck route designation, and regional access to Lakewood Center, Long Beach Airport, retail, colleges, and medical and employment centers. The approximate 1%-mile complete -/green - street improvements between the northern city limits and Del Arno Boulevard involved width modifications to Lakewood Boulevard to provide for a regional bicycle path in compliance with the Gateway Council of Governments Active Transportation Plan and sidewalk segment improvements to allow pedestrian access to various commercial establishments and Lakewood Center. Landscape Improvements and water conservation features were incorporated into the preliminary design. This project was funded by Los Angeles County Metropolitan Transit District Measure R Interstate 91/605 Hot Spots Expenditure Plan funds.

First Last Mile Improvements, City of Inglewood, CA. Civil Engineer. Willdan is providing professional engineering design services for First/Last Mile Improvement Project - Phase 1. We understand the City received a $6.5 million grant from Metro for the implementation of the First/Last Mile Improvement Project. This project encompasses complete street improvements on 13 streets/corridors as identified as pathway networks around of following three Crenshaw/LAX Line stations and one Green Line station: 1) Fairview Heights Station; 2) Downtown Inglewood Station; 3) Westchester/Veterans Station; and 4) Crenshaw Green Line Station. In general, the proposed improvements will include enhanced crosswalks, wayfinding signage, bicycle lanes, bicycle sharrows, bus shelters, benches, trash cans, bike cut through diverter modifications, and ADA accessible curb ramps.

Malvern Street Rehabilitation, City of Buena Park, CA. Civil Design Lead. Willdan provided engineering design services for the preparation of plans, specifications, and cost estimates (PS&E), traffic control plans, pavement engineering, and utility coordination for the pavement rehabilitation of Malvern Avenue from West to East City Limits, approximately 1.75 miles. The project improvements included pavement rehabilitation, curb and gutter replacements, sidewalk repair, upgrade of curb ramps to be ADA-compliant, driveway repairs, replacement of slotted cross gutter and spandrels, thermoplastic striping, and signage.

On -Call Engineering Services, City of La Puente, CA. Civil Design. Willdan is providing as -needed city and traffic engineering services to the City of La Puente. In addition to providing extension of staff services, Willdan provides engineering design, construction management, project management, development review, pavement engineering, funding administration, plan review, landscape architecture, surveying, and geotechnical engineering services throughout the city.

On -Call Engineering Services, City of Paramount, CA. Civil Design. Willdan serves as city engineer and water engineer. In addition to providing extension of staff services, Willdan has provided traffic engineering, assessment engineering, public works permits/inspection, development review, CIP design and construction management/inspection, CDBG administration, grant writing, and NPDES services.

Statement of Qualifications for On -Call 24
�y Professional Civil Engineering Services

Joseph Bellomo,l •,
Principal Project Manager
Project Role. Stormwater Anallysis and Improvernents Lead Education:

Registration:

Civil
State Universitv. Los
Civil Engineer, California No. 75564, Exp. 6130124
Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner No. 20016
Mr. Joseph Bellomo, prior to joining Willdan, worked in the Department of Health Services for the County of Los Angeles as the Senior Environmental Health Technician for the Bureau of District Environmental Services (DES). The Bureau of DES is responsible for managing impacts to public health at commercial food facility and housing in Los Angeles County. During his time in DES, Mr. Bellomo transitioned from conducting inspections in the field to administrative responsibilities under the direct supervision of the Bureau Director as the County began the restaurant grading program and reformation of food facility inspections. In January 2004, Mr. Bellomo joined Willdan as a Civil Engineer to work on various aspects of storm water and city engineering. Since his start with the firm, Joe has used his experience and knowledge of the State and Federal National Pollutant Discharge Elimination Systems program to manage compliance for many of Willdan's clients.

Glenoaks Boulevard HSIP Cycle 7 and Resurfacing Improvements HSIP-5202(018), City of San Fernando, CA. Project Engineer.

Willdan is providing preliminary and final engineering design services for the City of San Fernando's HSIP Cycle 7 improvements.

The $2.1 million budget is comprised of $1.5 million Local Measure R funds, $97,846 CalRecycle funds, and $500,000 City utility funds. The design involves traffic signal modifications to protected/left turn phasing and non -landscaped raised doweled medians for the length of the turn pockets at Arroyo Street, Griswald Avenue, Grand Boulevard, Maclay Avenue, Haring Avenue, and Orange Grove Avenue. The project involves 1.27 miles of street resurfacing between the east and west city limits. The project Improvements included street, water, storm drain, traffic signal, signing and striping design; topographic survey; potholing; utility coordination; NEPA/CEQA clearance; federal paperwork administration; geotechnical and pavement engineering; and public outreach.

Stormwater Management, City of Canyon Lake, CA. Project Manager. Manage and implement programs for compliance with various NPDES permits, TMDLs, and Waste Discharge Requirements for the City, and assist with multi -agency watershed monitoring and projects. This includes developing and conducting inspection programs of commercial/industrial businesses and construction sites, public education and training programs, and nuisance runoff reduction programs.7 City Engineering and Stormwater Management, City of Westlake Village, CA. Project Manager. Manage and implement programs for compliance with various NPDES permits, TMDLs, and Waste Discharge Requirements for the City, and lead multi - agency watershed monitoring and projects. This includes developing and conducting water quality monitoring programs, inspection programs of commercial and industrial business, public education and training programs, nuisance runoff reduction programs, and water quality improvement projects. Staff has managed watershed planning and monitoring contracts on behalf of the Malibu Creek Watershed Enhanced Watershed Management Plan Group, a group consisting of 4 cities, the Los Angeles County Flood Control District and Los Angeles County Public Works.

Water Quality Services, City of La Canada Flintridge, CA. Project Manager. Willdan implemented the City's Enhanced Watershed Management Plan, Coordinated Integrated Watershed Management Plan, and NPDES Program Management and Representative to the Upper Los Angeles River Enhanced Watershed Management Program Group.

Water Quality Consultant Services, City of Hidden Hills, CA. Project Manager. Willdan is responsible for full compliance with the Municipal NPDES Permit, Total Maximum Daily Loads (TMDLs) in the Los Angeles River Watershed and Malibu Creek Watershed, as well as other NPDES regulations.

Water Quality/ NPDES Compliance Services, City of Bell, CA. Project Manager. Willdan implemented the City's Enhanced Watershed Management Plan, Coordinated Integrated Watershed Management Plan, and NPDES Program Management and Representative to the Los Angeles River— Reach 2 Watershed Management Program Group.

Statement of Qualifications for On-Call�y 2
Professional Civil En&eering Services

Ron
ENV SP
Stein, a
Project Manager lP
Project Roie. Sewer Analysis and improvements Lead
Education: BS, Civil Engineering, Florida State University Tallahassee, FL Registration: Civil Engineer, California No. 86877, Exp. 3131125 ENV SP, Institute for Sustainable Infrastructure No. 56028 Mr. Ronald Stein offers expertise as a project manager, civil engineer, and quality assurance plan reviewer for various municipalities. He has led land development engineering teams engaged in design of projects encompassing storm drains, grading, erosion control, street improvements, striping, traffic control, and utilities. Throughout the various design stages, Mr.

Stein conducts meticulous quality assurance to ensure every submittal adheres to all local agency and client standards. He is highly skilled in development and review of hydrology/hydraulic calculations and reports, cost estimates, stormwater pollution and prevention plans, water quality management plans, and erosion and sediment control plans. Mr. Stein possesses a strong background with a broad expanse of project types encompassing residential and commercial developments, healthcare facilities, universities, stadiums, solar farms, warehouses, and naval facilities. He brings valuable public works experience from his three years with the Florida Department of Transportation, where he rotated through every office of the department and acquired a strong, diverse technical foundation.

Relevant Project Experience
On -Call Engineering Services, City of Paramount, CA. Civil Design Lead. Willdan is providing civil engineering, traffic engineering, agency engineering, landscape design services, survey, contract administration, construction observation, utility coordination, federal labor compliance, pavement engineering, public works permits/inspection, development review, CIP design/inspection, CDBG administration, grant writing, and NPDES. Willdan has overseen the design and construction of more than $15 million in water system improvements for the City, including the recent design and construction of two new wells.

On -Call Planning and Engineering Services, County of Orange, CA. Project Manager. Willdan is currently responsible for reviewing private developer projects spanning both on -site and off -site improvements. Review services cover Final Parcel and Tract Maps, lot line adjustments, grading & erosion control plans, storm drain plans, hydrology, water & sewer improvement plans, street improvement plans, signing & striping plans, traffic signal plans, landscape plans, storm water pollution prevention plans (SWPPP), and water quality management plans (WQMP). The County has an expedited review contract for the Rancho Mission Viejo residential development with strict deadlines on a condensed schedule.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, CA. Project Manager responsible for overall project management and oversight of final engineering design services required for 1%-mile complete street/green street improvements between the north City limit and Del Arno Boulevard to provide for a regional bicycle path in compliance with the Gateway Council of Governments Active Transportation Plan and improve pedestrian access to retail/commercial establishments. The design entailed coordination of pedestrian and bicycle movements into the current County Traffic Signal Synchronization Program, undergrounding utility distribution and transmission, Green Streets storm water quality treatment, and drought -tolerant landscaping. Other improvements involved upgraded traffic signal equipment to improve safety, bicycle parking and lockers, improved transit stops, sidewalk additions within the corridor to meet ADA requirements, street resurfacing, and irrigation. Willdan provided preliminary and final design, NEPA/CEQA documentation and permitting, transit partnering outreach, Corridor Committee meeting participation, and construction funding application preparation.

District -Wide Storm Drain Repairs, De Luz Community Service District, Murrieta, CA. Project Manager responsible for overall project management and oversight of all services required for the FEMA-funded storm drain improvements at 57 locations identified by the District's maintenance team. The work involved paving, curb and gutter, drain basins, CIPP lining, storm drain improvements, head walls, and grading to ensure proper conveyance of runoff to existing drainage facilities. Hydrologic analyses were required for each site to maintain and improve the existing drainage course. Coordination with FEMA was performed to ensure the project was designed and constructed in accordance with funding requirements.

Highway Safety Improvement Cycle 8 Design, City of La Puente, CA. Civil Engineering Task Manager responsible for management of civil engineering design services required for the improvements. Willdan provided preliminary engineering design, utility coordination, contract administration, and funding administration improvements at eight crosswalk locations.

Statement of Qualifications for On -Call 26
�y Professional Civil Engineering Services

Ana
PE
a
Project Role: Water and Wastewater Analysls and Improvements Lead Education: MS, Sanitary/Environmental Engineering
BS. Civil Enaineerina
Registration: Civil Engineer, California No. 44287, Exp. 6130125 ■ California Water Treatment Plant Operator Grade 4
Water Distribution System Operator Grade 5
Sewer Collection System Operator Grade 4
Experience: 35 Years
Mr. Ana Ananda possesses over 35 years of professional engineering and program management experience of public and private entities, managing millions of dollars in infrastructure. He has a high degree of Planning, Design, Project Management, Construction Management, and Contract Administration experience, as well as extensive experience with Operation and Maintenance of Water, Sewer, and Recycled Water Systems. He possesses in-depth design and operations experience with Street Improvements, Groundwater Wells, Pumping Stations, Water Treatment Plants and SCADA Systems.

Glenoaks Boulevard HSIP Cycle 7 and Resurfacing Improvements HSIP-5202(018), City of San Fernando, California. Civil Design Lead. Willdan is providing preliminary and final engineering design services for the City of San Fernando's HSIP Cycle 7 improvements. The $2.1 million budget is comprised of $1.5 million Local Measure R funds, $97,846 CalRecycle funds, and $500,000 City utility funds. The design involves traffic signal modifications to protected/left turn phasing and non -landscaped raised doweled medians for the length of the turn pockets at Arroyo Street, Griswald Avenue, Grand Boulevard, Maclay Avenue, Haring Avenue, and Orange Grove Avenue. The project involves 1.27 miles of street resurfacing between the east and west city limits. The project Improvements included street, water, storm drain, traffic signal, signing and striping design; topographic survey; potholing; utility coordination; NEPA/CEQA clearance; federal paperwork administration; geotechnical and pavement engineering; and public outreach.

Various Projects, City of Pico Rivera, California. As Contract Utility Program Manager, assisted Public Works Director in all aspects of utility operations; worked with field superintendents to ensure coordinated work assignments and project planning related to the operation, maintenance and construction of electric, facility, water and wastewater systems. Managed and provided oversight for contracted utility projects, including pump stations SCADA, services and purchases, regularly inspected work sites to ensure progress and compliance.

Various Projects, City of South Gate, California. Contract Program Manager responsible for the City's Capital Improvement Program, including the design and construction of the Elizabeth Reservoir, Santa Fe Water Tower rehabilitation, watermains, booster pump station, well rehabilitations and new well construction, and Citywide Chlorination Systems Upgrade.

Padre Dam Municipal Water District, California. Project Manager responsible for the CALTRANS State Route 52 utility relocation project which included 60", 12", 20", and 24" water, reclaimed water, and sewer mains. Designed and provided construction management for the San Diego County Water Authority Connection # 6, (30"main); and designed and managed construction of the Prospect Avenue water main replacement project (3 miles of 12" main).

Statement of Qualifications for On -Call 27
�y Professional Civil Engineering Services

Aaron
PE
Cowen,
Plan Check Engineer
Project Role: Structural Engineer1rig I..ead
Education: MS, Structural Engineering, BS, Civil Engineering Registration: California Professional Engineer, CE#58878, Exp. 6130125 ICC Plan Examiner
Experience: 128 Years
Mr. Aaron Cowen, a registered Civil Engineer in California, is a Plan Check Engineer for the Building and Safety Division. Aaron has more than 28 years of experience in the engineering field including design, drafting and plan check experience. Mr. Cowen's experience includes the design of wood structures, cantilevered concrete decks, thin -wall concrete shells, retaining walls, foundation systems, and design calculations. Mr. Cowen's previous engineering experience includes the position of Senior Engineer with a Southern California engineering firm. In this capacity, he was design lead on numerous projects, provided on -site field inspections; and was responsible for the management and administration of all engineering data and information.

Canyon Lakes Parking Lot, Canyon Lakes Community Services District, CA. Structural engineer responsible for the design, structural calculations and plan preparations of the 13-foot-high retaining wall within the community.

Long Valley Road/US 101 On -ramp Widening Project, City of Hidden Hills, CA. Structural engineer responsible for the design, structural calculations and plan preparations of the 8-foot-high retailing wall along the property line.

Butterfly Garden Park Project, City of Bellflower, CA. Structural engineer responsible for the design, structural calculations and plan preparations of the cantilevered pilaster for the gates to avoid a conflict with an active oil line.

Los Alamitos Community Center Roof Replacement Project, City of Los Alamitos, CA. Structural engineer responsible for the design, structural calculations and preparation of the plan and specification for the design and construction of the tiles roof at the city's community center.

STRUCTURAL PLAN CHECK EXPERIENCE
City of Rosemead I City of Goleta I City of Moreno Valley I Morongo Band of Mission Indians I City of Canyon Lake I City of Rialto I City of San Bernardino I City of Norco I City of Highland I City of Loma Linda I City of Grand Terrace Chien -Chang , ■
Supervising Engineer
Project Role: Geotechrilical Analysis and Design Lead
Education: PhD, 6eotechnical Engineering
MS, 6eotechnical Engineering
BS, Civil Engineering
Registration: 6eotechnical Engineer, California No. 3183, Exp. 6130124 Civil Engineer, California No. C63238, Exp. 6130124
Experience: 124 Years
Mr. Chien -Chang Chen has over 24 years of experience in geotechnical and earthquake engineering. He specializes in developing foundation recommendations for the design and construction of pipelines, transportation, power supplies, residential development, schools, and commercial structures including the mitigation of soft ground and liquefaction by ground improvement. Mr. Chen offers leadership in the provision of geotechnical interpretation, analysis, the development of geotechnical solutions and design production, including project management and business development. He has worked on a wide variety of engineering projects in the USA, New Zealand and Taiwan.

Statement of Qualifications for On -Call 28
�y Professional Civil Engineering Services

Bellflower High School Auto Shop Shelter, Bellflower Unified School District, Lakewood, CA. Geotechnical Engineer. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection.

City Trunk Line South — Unit 6 (CTLS-6), Studio City, California, Los Angeles Department of Water and Power (LADWP). Project Engineer. Performed geotechnical field investigation and prepared geotechnical baseline reports for the CTLS-6 project.

Century Trunk Line — Unit 1 (CTL-1), Inglewood, California, Los Angeles Department of Water and Power (LADWP). Project Engineer. Performed technical review of shoring system designed by the Contractor and construction inspection for the CTL-1 project.

State Route 91 Widening Project, Caltrans, Yorba Linda, California. Project Engineer. He supervised the field investigation and performed engineering analysis including seismic analysis, liquefaction potential, retaining wall/roadway embankment analysis and design, bearing capacity and settlement analysis for shallow foundations and pile design for bridge widening.

David,
PLS
Principal Project Manager
Project Rolle: Structural Engineering Lead
Education: Survey and Mapping Courses — Ethics, Business & Professions Code, ALTA/NSPS, Copyright Law, and Land Surveying Land Surveyor, California No.
37 Years
Mr. David Woolley possesses a full complement of land surveying expertise. His background and knowledge encompasses standard of care, construction surveying, boundary line determinations and analyses, boundary disputes, deed interpretations, boundary reconstructions, easement analyses and construction, map preparation, construction, and constructability. Mr.

Woolley offers a strong history interpreting the Professional Land Surveyor's Act and California Subdivision Map Act and ensuring prepared and reviewed documentation conforms to all codes and regulations under those acts — along with any local or regional requirements. Mr. Woolley was the former supervisor of the Record of Survey and Parcel Map Checking Section of the Orange County Surveyor's office. He was responsible for compliance with state laws, local ordinances and boundary determination. In addition to preparing records -of -survey, he reviewed over 1,200 tract maps, 500 parcel maps, and 300 records -of -survey prepared by private land surveyors. Mr. Woolley served as the Interim City Surveyor for the City of Long Beach.

On -Call Engineering Services, City of Paramount, CA. Land Survey Task Lead. Willdan has provided general engineering services to the City of Paramount for over 43 years and presently serves as city engineer and water engineer. In addition to providing extension of staff services, Willdan has provided traffic engineering, assessment engineering and district formation, public works permits/inspection, development review, CIP design and construction management/inspection, CDBG administration, grant writing, and NPDES services. These services encompass — but are not limited to — study and report research and preparation; plan, specification, and cost estimate preparation; funding source and availability consultation; citizens' request and complaint investigations/resolutions; development impact studies; plan checking; City staff, commissions, and council report preparation; staff, commissions, and council meeting attendance and participation; and City department coordination to implement desired City improvements and updates.

On -Call Services for City Surveyor, Traffic Engineering, Environmental Review, and Labor Compliance, City of El Monte, CA.

Contract City Surveyor and Survey/Mapping Reviewer. Plan checks encompass first, second, and third reviews as necessary for street, traffic, sewer, storm drain, geotechnical reports, SWPPPs, and map checks.

On -Call Survey Services, City of Lakewood, CA. Survey/Mapping Reviewer. Willdan provides technical checking services for lot line adjustments and easement dedications and has performed topographic surveys, prepared base maps for use in designs, and performed right-of-way engineering for citywide improvement projects.

On -Call Traffic Engineering Services, City of Los Alamitos, CA. Land Survey Task Lead. Willdan is providing as -needed engineering services to the City of Los Alamitos as part of our extension of staff services for contract City Engineer and contract Traffic Engineer.

Statement of Qualifications for On -Call 29
Professional Civil Engineering Services

Education: BS, Landscape Architecture, California State Polytechnic University, Pomona European Study Tour, California Polytechnic State University, School of Architecture, Pomona Registration: Landscape Architect California No. 3551, Exp. 7131125 Licensed Contractor, California C-27, No. 713613, Exp. 10131125 Experience: 132 Years
Mr. John J. Hidalgo possesses in-depth expertise in landscape architecture design development, preparation of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo is familiar with various local, state, and federal codes, regulations, procedures, and standards relating to construction, safety, park and facility planning, and other landscape and irrigation amenities. He has successfully completed projects in compliance with these various standards. Mr. Hidalgo has experience representing project owners during the plan review process. He possesses comprehensive experience in both field observation and construction. Mr. Hidalgo's responsibilities include managing park and street beautification design, low -impact developments, plan reviews, and construction observation.

On -Call Engineering Services, City of Paramount, CA. Civil Design Task Lead. Willdan is providing civil engineering, traffic engineering, agency engineering, landscape design services, survey, contract administration, construction observation, utility coordination, federal labor compliance, pavement engineering, public works permits/inspection, development review, CIP design/inspection, CDBG administration, grant writing, and NPDES. Willdan has overseen the design and construction of more than $15 million in water system improvements for the City, including the recent design and construction of two new wells.

As -Needed Landscape Architecture and Engineering Design Services, County of Los Angeles, CA. Project Manager. The County retained Willdan to provide as -needed landscape architectural/engineering design services. Those services include preparation of feasibility studies, program development, project design, plan checking, graphic design, cost estimating and engineering design in support of landscape projects. In addition, other services included staff augmentation at the Alhambra office location and construction support.

Lakewood Boulevard and Del Amo Boulevard Hot Spot Intersection Improvements, City of Lakewood, CA. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for intersection improvements.

Improvements encompassed widening the west side of Lakewood Boulevard, modifying/removing the median island on Lakewood Boulevard, widening the south side of Del Amo Boulevard, modifying the median island on Del Amo Boulevard, modifying the traffic signal, relocating street lights per street/median is -land modifications, box culvert/channel wall modifications, extending Del Amo Boulevard Class 2 bike lanes east of Lakewood Boulevard, and converting a bike path to a recreational path. Willdan aided by obtaining a County of Los Angeles construction permit/license agreement for work within channel.

Centinela Avenue Median, ADA, and Traffic Signal Improvements, City of Inglewood, CA. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required SB-1 and HSIP funded improvements. The HSIP segment of the project involved installing raised median islands and protected left -turn phasing and upgrading traffic signals between La Cienega Boulevard and La Brea Avenue. The S131 funded improvements entailed improvements between La Cienega Boulevard and Florence Avenue and involved reconstructing curb and gutter, resurfacing with asphalt -rubber hot -mix; reconstructing damaged and uplifted concrete sidewalk; installing access curb ramps in compliance with ADA requirements; installing landscaping along the parkway; signing and striping; street lighting; and fiber optic interconnects. Both project segments were designed simultaneously and bid as one construction package with two separate bid schedules.

Firestone Boulevard Regional Corridor Capacity Enhancement, City of South Gate, CA. Landscape Architecture Task Manager responsible for providing and overseeing all landscape and irrigation design required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADA- compliant ramps; parkway trees; artistic elements and corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications.

Statement of Qualifications for On -Call 0
�y Professional Civil Engineering Services

N4/W I L L DAN
Industry, CA 91746-3443
562.908.6200 1 800.499.44A I Fax: 562.695.2120

CITY OF DOWNEY

PROFESSIONAL SERVICES AGREEMENT
WITH

FOR PROFESSIONAL ON -CALL CIVIL ENGINEERING SERVICES

1. PARTIES AND DATE.

This Agreement is made and entered into this day of , 2024 by and between the City of Downey, a California municipal corporation and charter city with its principal place of business at 11111 Brookshire Avenue, Downey California 90241 ("City") and , a California [corporation LLC],
with its principal place of business at
("Consultant"). City and Consultant are
sometimes individually referred to as "Party" and collectively as "Parties."

2. RECITALS.

2.1 Consultant.

Consultant desires to perform and assume responsibility for the provision of certain professional engineering services required by City on the terms and conditions set forth in this Agreement. Consultant represents that it has demonstrated competence and experience in providing professional engineering services to public clients, is licensed in the State of California, and is familiar with the plans of City.

2.2 Project.

City desires to engage Consultant to render such services for On -Call Civil Engineering Services as set forth in this Agreement.

3. TERMS.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional engineering services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The term of this Agreement shall be from February 1, 2024 to December 31, 2024, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The term of this Agreement may be extended by a written amendment to this Agreement signed by the City Manager and Consultant.

ATTACHMENT H

3.2 Responsibilities of Consultant.

3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee. Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.

In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (CaIPERS) to be eligible for enrollment in CaIPERS as an employee of City, Consultant shall indemnify, defend, and hold harmless CITY for the payment of any employee and/or employer contributions for CaIPERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

3.2.2 Schedule of Services. Consultant shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "A" attached hereto and incorporated herein by reference.

Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall respond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. The parties acknowledge that the Schedule of Services may be amended by mutual agreement due to changes in circumstances, including changes in the performance schedules of other third parties performing work for the City on the Project, which affect the timing of Consultant's performance of the Services.

3.2.3 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City.

3.2.4 Substitution of Key Personnel. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City.
2 3.2.5 City's Representative. The City hereby designates Matthew Baumgardner, or his designee, to act as its representative for the performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Consultant shall not accept direction or orders from any person other than the City's Representative or his designee.

3.2.6 Consultant's Representative. Consultant hereby designates [_INSERT NAME OF CONSULTANT'S REPRESENTATIVE 1, or his or her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative").

Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.2.7 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.

3.2.8 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub -consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner consistent with the standard of care set forth herein, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.

3.2.9 Laws and Regulations. Consultant shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in force at the time the Services are performed by Consultant and in any manner affecting the performance of the Project or the Services, including all applicable Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If the Consultant performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Consultant shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the applicable indemnification provisions of this Agreement, from any claim or liability arising out of 3 any failure or alleged failure to comply with such laws, rules or regulations. Consultant's violation of such laws, rules and regulations shall also constitute a material breach of this Agreement.

3.2.10 Insurance.

3.2.10.1 Time for Compliance. Consultant shall not commence the Services or the Project under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience with insurer, coverage or other special circumstances.

3.2.10.2 Minimum Requirements. Consultant shall, at its expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement, the Services or the Project by the Consultant, its agents, representatives, employees or subcontractors. Consultant shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage:
(A) Minimum Scope of Insurance. (1) Commercial
General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis including products and completed operations, property damage, bodily injury and personal and advertising injury; (2) Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto) or if Consultant owns no autos, Code 8 (hired) and 9 (non -owned); and (3) Workers' Compensation: Workers' Compensation insurance as required by the State of California with Statutory Limits; and (4) Employer's Liability Insurance. (B) Minimum Limits of Insurance. Consultant shall
maintain limits no less than: (1) Commercial General Liability (CGL): No less than $2,000,000 per occurrence for products and completed operations, bodily injury, property damage and personal and advertising injury. If Commercial General Liability Insurance or other form with general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: No less than $2,000,000 per accident for bodily injury and property damage; and (3) Workers' Compensation: Workers' Compensation limits as required by the Labor Code of the State of California with Statutory Limits; (4) Employer's Liability: Employer's Liability limits of no less than $2,000,000 per accident for bodily injury or disease. Employer's Liability coverage may be waived by the City if City receives written verification that Consultant has no employees.

If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.2, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

3.2.10.3 Professional Liability (Errors & Omissions). Consultant shall procure and maintain, and require its sub -consultants to procure and maintain, for a period 4 of five (5) years following completion of the Services or the Project, errors and omissions liability insurance appropriate to its profession. Such insurance shall be in an amount not less than $2,000,000 per occurrence or claim and $2,000,000 in the aggregate, and shall be endorsed to include contractual liability. If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.3, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

3.2.10.4 Insurance Endorsements. The insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Additional Insured Status. The Commercial
General Liability policy shall be endorsed to state that: (1) the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to liability arising from the work, Services, Project or operations performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work, Services. Project or operations; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Consultant's scheduled underlying coverage. Commercial General Liability insurance coverage may be provided in the form of an endorsement to the Consultant's insurance (at lease as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33 or CG 20 38; and CG 20 37 forms if later revisions are used).
(B) Waiver of Subrogation. Consultant hereby grants to
City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under said insurance policies set forth herein. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (C) All Coverages. Each insurance policy required by
this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except with written notice by certified mail, return receipt requested to the City; and (B) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.

3.2.10.5 Primary Coverage. For any claims related to this Agreement, the Consultant's insurance coverage shall be primary insurance and primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the City, its directors, officials, officers, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of the Consultant's insurance and shall not be called upon to contribute with it in any way.

3.2.10.6 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In 5 addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents and volunteers.

3.2.10.7 Deductibles and Self -Insurance Retentions. Any deductibles or self -insured retentions must be declared to and approved by the City. City may require Consultant to provide proof of ability to pay losses and related investigations, claim administration and defense expenses and costs within the retention. The policy language shall provide or be endorsed to provide that the self -insured retention may be satisfied by either the named insured or City.

3.2.10.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating no less than A:VII, authorized to do business in California, and satisfactory to the City.

3.2.10.9 Verification of Coverage. Consultant shall furnish City with original certificates of insurance, including all required amendatory endorsements (or copies of the applicable policy language effective coverage required by this provision) and a copy of the Declarations and Endorsement Page of the Commercial General Liability policy listing all policy endorsements to the City before the commencement of work under this Agreement. However, failure to obtain the required documents prior to the commencement of work under this Agreement shall not waive the Consultant's obligation to provide them to the City. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, at any time.

3.2.10.10 Claims -Made Policies. If any of the policies provide coverage on a claims -made basis:
(A) The retroactive date must be shown and must be
before the date of this Agreement or the date work commences under this Agreement, whichever is earliest;
(B) Insurance must be maintained and evidence of
insurance must be provided for at least five (5) years after completion of the Services provided under this Agreement;
(C) If coverage is canceled, non -renewed, and not
replaced with another claims -made policy form with a retroactive date prior to the effective date of this Agreement or the date work commences under this Agreement, whichever is earliest, the Consultant must purchase extended reporting coverage for a minimum of five (5) years after completion of the Services under this Agreement.

3.2.11 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe traffic control, walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment 6 and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.3 Fees and Payments.

3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" attached hereto and incorporated herein by reference. The total compensation shall not exceed [_INSERT WRITTEN AMOUNT] ($[_INSERT NUMERICAL DOLLAR AMOUNT_]) without written approval of the City. Extra Work may be authorized, as described below, and if authorized, said Extra Work will be compensated at the rates and manner set forth in this Agreement.

3.3.2 Payment of Compensation. Consultant shall submit to City a monthly itemized statement which indicates work completed and hours of Services rendered by Consultant. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by City.

3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.

Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City Manager.

3.3.5 Prevailing Wages. Pursuant to Downey Municipal Code Section 2935, the requirements of California Labor Code Sections 1720 et seg. and 1770 et seg., as well as California Code of Regulations, Title 8, Section 16000 et seg. ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on certain "public works" and "maintenance" projects, shall apply to the Project. Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the Project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. If applicable, Consultant shall be registered at all times with the Department of Industrial Relations under the Public Works Contractor Registration Program for Labor Compliance. 7 3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time either for cause or for the City's convenience and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Consultant may only terminate this Agreement for cause upon giving the City not less than seven (7) calendar days' written notice.

Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation.

The City shall within fifteen (15) calendar days following termination pay the Consultant for all services adequately rendered and all reimbursable costs incurred by Consultant up to the date of termination, in accordance with the payment provisions of this Agreement.

The following reasons shall constitute "cause" for which either party may terminate this Agreement as provided herein:

Substantial failure by the other party to perform in accordance with the terms of this Agreement and through no fault of the terminating party; Assignment of this Agreement or transfer of the Project by either party to any other entity without the prior written consent of the other party; Suspension of the Project or the Consultant's Services by the City for more than ninety (90) calendar days, consecutive or in the aggregate, without good cause; • Material changes in the conditions under which this Agreement was entered into, the Scope of Services or the nature of the Project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such Documents and Data and other information within fifteen (15) days of the City's request.

1.1 3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Consultant:

City:

Phone:( ) -
Fax: ( ) -
Attn:

City of Downey
11111 Brookshire Avenue
Downey, California 90241
Phone: (562) 904-7110
Fax: (562) 904-7296
Attn: Matthew Baumgardner, P.E., Director of Public Works With a courtesy copy to:

City of Downey
City Attorney's Office
11111 Brookshire Avenue
Downey, California 90241
Such notice shall be deemed made when personally delivered or when mailed, forty- eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Ownership of Materials and Confidentiality.

3.5.3.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data 9 which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk.

3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents and Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant.

Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.

3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.5 Attorney's Fees. In the event of any litigation, whether in a court of law, administrative hearing, arbitration, or otherwise, arising from or related to this Agreement of the services provided under this Agreement, the prevailing party shall be entitled to recover from the non -prevailing party all reasonable costs incurred, including staff time, court costs, attorneys' fees and all other related expenses in such litigation.

3.5.6 Indemnification.

3.5.6.1 General Indemnification. Except as provided in subdivision

3.5.6.2 below which is applicable to "design professionals" only, Consultant shall defend (with counsel acceptable to City), indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged negligent acts, errors, omissions or willful misconduct of Consultant, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages and attorneys' fees and other related costs and expenses. The Consultant's duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Consultant shall defend, at Consultant's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Consultant shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any 10 and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials officers, employees, and agents or volunteers. Consultant shall not be obligated to defend, indemnify or hold the City harmless in any manner whatsoever for any claims or liability arising solely out of the City's own negligent acts, errors or omissions or willful misconduct.

3.5.6.2 Design Professionals. The provisions of this subdivision 3.5.6.2 shall apply only in the event that Consultant is a "design professional" within the meaning of California Civil Code section 2782.8(c). If Consultant is a "design professional" within the meaning of Section 2782.8(c), then, notwithstanding subdivision 3.5.6.1 above, to the fullest extent permitted by law (including, without limitation, Civil Code sections 2782 and 2782.6), Consultant shall defend (with legal counsel reasonably acceptable to City), indemnify and hold harmless City and City's officers, officials, employees, volunteers and agents from and against any Claim that arises out of, pertains to, or relates to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Consultant, any subconsultant, subcontractor or any other person directly or indirectly employed by them, or any person that any of them control, arising out of Consultant's performance of any task or service for or on behalf of City under this Agreement. The Consultant's duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Such obligations to defend, hold harmless and indemnify City or any City officers, officials, employees or volunteers shall not apply to the extent that such Claims are caused in part by the sole active negligence or willful misconduct of City or such City officers, officials, employees, volunteers and agents. Consultant's cost to defend City and/or City's officers, officials, employees or volunteers against any such Claim shall not exceed Consultant's proportionate percentage of fault with respect to that Claim; however, pursuant to Civil Code section 2782.8(a), in the event that one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, Consultant shall meet and confer with City (and, if applicable, other parties) regarding any unpaid defense costs. To the extent Consultant has a duty to indemnify City or any City officers, officials, employees, volunteers and/or agents under this subdivision 3.5.6.2, Consultant shall be responsible for all incidental and consequential damages resulting directly or indirectly, in whole or in part, from Consultant's negligence, recklessness or willful misconduct.

3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements.

3.5.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be the courts in Los Angeles County.

3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.
11 3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.12 Assignment or Transfer. Neither party shall assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the other party. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.

Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subcontractors of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

3.5.16 No Third -Party Beneficiaries. There are no intended third -party beneficiaries of any right or obligation assumed by the Parties.

3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, 12 sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of any City Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.5.22 Counterparts. This Agreement may be executed in counterparts, each of which shall constitute one and the same instrument.

3.5.23 Effect of Conflict.

In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, any of its exhibits, attachments, purchase order, or notice to proceed, the provisions of this Agreement will govern and control.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Consultant shall require and verify that all subcontractors maintain insurance meeting all of the requirements set forth in this Agreement. Consultant shall ensure that City is an additional insured as required in Section 3.2.10.4. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. 13 CITY OF DOWNEY,
a California municipal corporation
and charter city
la
Attest:

Mario Trujillo, Mayor
Maria Alicia Duarte, CIVIC
City Clerk
Approved as to Form:

John M. Funk,
City Attorney
0119.123859
a
Attest:
[INSERT NAME]
Its:
[INSERT TITLE]
Secretary
Approved as to Form:

Legal Counsel
14