TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, P.E., DIRECTOR OF PUBLIC

WORKS/CITY ENGINEER
DATE: JANUARY 23, 2024
SUBJECT: FISCAL YEAR 2024-2026 ON -CALL CIVIL ENGINEERING CONSULTANTS

EXECUTIVE SUMMARY
The City Council will discuss or consider approving staff's pre -qualified list of on -call civil engineering consultants to provide the City with civil engineering services on an as - needed basis over a three-year period during Fiscal Year 2023-2024 and continuing through Fiscal Year 2026-2027 with an option to renew the approved list for three additional one-year periods.

RECOMMENDATION
That the City Council:

1. Approve the following list of seven on -call civil engineering consultants, which have been pre -qualified by staff: 1) BKF Engineers, Inc., 2) Kreuzer Consulting Group, 3) MKN Consulting Services, 4) Rick Engineering Co., 5) Stantec Consulting Services, 6) Tetra Tech, and 7) Willdan Engineering;

2. Approve the Professional Services Agreement template for on -call civil engineering services, and

3. Authorize the City Manager, or his designee, to execute the agreement with the pre - qualified consultants on a per -project basis in the future in a form acceptable by the City Attorney and to execute any and all amendments to the agreement as deemed necessary for any future projects or tasks to be completed by said consultants.

BACKGROUND
The Public Works Department occasionally has a need to contract out civil engineering - related services to professional engineering consultants to assist the Department with the completion of various projects and tasks. This allows staff to supplement its resources with more specific expertise as well as leverage additional assistance during busier times of the year. Examples of work that has been completed through the subject on -call services in the past include preliminary engineering, final design, plans, specifications, and estimates for the following types of projects in support of the City's Capital Improvement Program:

FISCAL YEAR 2024-2026 ON -CALL CIVIL ENGINEERING CONSULTANTS JANUARY 23, 2024
PAGE 2
o Street improvements and intersection widening
o Pavement and infrastructure rehabilitation and reconstruction o Water, sewer, and stormwater infrastructure improvements o Water well and water treatment improvements
o Streetscape enhancements
o "Green Street" projects
o Drainage infrastructure
o Sidewalk, curb ramp and other pedestrian circulation improvements o Median Island Construction
The City last procured the services of on -call civil engineering consultants in 2017, and the respective professional services agreements of the on -call firms have since expired.

Therefore, the City is ready to engage the services of new on -call consultants for the next round of civil engineering services on an as -needed basis over the next three years (Fiscal Year 2024-2026) with an option to extend up to an additional three years to 2029.

ANALYSIS
A Request for Qualifications (RFQ) for the subject professional services was published on Planet Bids on September 15, 2023. On October 13, 2023, a total of 12 Statements of Qualifications (SOQs) were received from civil engineering firms in response to the RFQ.

An evaluation panel consisting of three Engineering Division employees was assembled to review the SOQs and evaluate and rank the consultants accordingly based on the following seven evaluation criteria (with corresponding weight):

Criteria Weight%)

1. Compliance with the format requested
and completeness of submittal.
[u

2. Overall responsiveness of the submittal, 20
clearly stating an understanding of the
City's needs and the work program to be
utilized to deliver said professional services
and demonstrating a good, practical
approach in providing the services.

3. Experience and expertise of the firm in providing 20 relevant professional services. Specialized
experience for the work, along with the ability
to manage, control, and schedule concurrent
projects and tasks at multiple locations.

4. Relevant experience and qualifications of the 20
firm.

FISCAL YEAR 2024-2026 ON -CALL CIVIL ENGINEERING CONSULTANTS JANUARY 23, 2024
PAGE 3

5. Client references and satisfaction on prior 10
Projects, tasks, or services.

6. Demonstrated track record of consultant 10
and subconsultant (if any) firms working
together on relevant project(s), task(s) or
service(s).

7. Certification of the firm as a minority -owned 10
business.

The SOQs of the 12 firms were subsequently scored based on the above criteria. The resulting scores of the SOQs submitted by the 12 firms are as follows:

Firm SOQ Ranking

1. Stantec Consulting Services 1

2. Tetra Tech 2

3. Willdan Engineering 3

4. Rick Engineering Co. 4

5. BKF Engineers 5

6. MKN & Associates 6

7. Kreuzer Consulting Group 7

8. TAIT & Associates 8

9. SA Associates 9

10. Kabbara Engineering 10

11.Onward Engineering 11

12.IMEG 12
Based on the rankings of the SOQs submitted by the 12 firms as shown, staff recommends the approval of the pre -qualified list of the top seven -ranked firms. Once approved, the seven firms will be sent Requests for Proposals (RFPs) on an as -needed basis as the need arises for procuring the services of one of the firms to assist the City with civil engineering services for a specific project or task. The proposals subsequently received will undergo a similar evaluation process, and the top -ranked firm, based on

FISCAL YEAR 2024-2026 ON -CALL CIVIL ENGINEERING CONSULTANTS JANUARY 23, 2024
PAGE 4
relevant experience, scope of work, competitive fee, and schedule, will be selected. The SOQs of the seven pre -qualified firms are attached (Attachments A-G).

A professional services agreement based on the attached template agreement (Attachment H) will then be executed with the top -ranked firm, followed by the issuance of a purchase order to said firm. Staff recommends the approval of the attached template agreement. Upon approval of the pre -qualified consultant list and template agreement, staff will immediately begin preparing RFPs for civil engineering services as needed.

Proposed upcoming projects and tasks include the preparation of plans, specifications and, estimates (PS&E) for the Imperial Highway and Lakewood Boulevard pavement rehabilitation, concrete construction/reconstruction & ADA improvements, alley pavement rehabilitation and improvements, South Downey Safe Routes to School Phase 2, and sanitary sewer and storm water infrastructure improvements including sewer pipe rehabilitation and storm water infiltration.

The on -call civil engineering services will be funded through a variety of Capital Improvement Programs as well as operating budget accounts, depending on the scope of work for each project and task.

CITY COUNCIL PRIORITIES
Efficiency & Adaptability
Quality of Life, Safety & Infrastructure

FISCAL IMPACT
There is no fiscal impact.

ATTACHMENTS
Attachment A: BKF Engineers SOQ
Attachment B: Kreuzer Consulting Group SOQ
Attachment C: MKN and Associates SOQ
Attachment D: Rick Engineering Co. SOQ
Attachment E: Stantec Consulting Services SOQ
Attachment F: TetraTech SOQ
Attachment G: Willdan Engineering SOQ
Attachment H: Professional Services Agreement Template

BKF ENGINEERS
4675 MacArthur Court, Suite 400
Newport Beach, CA 92660
www.bkf.com

ATTACHMENT A

Mr. Baumgardner:

BKF Engineers (BKF) welcomes the opportunity to submit our qualifications for the Chv's consideration for the City's RRQfor On -Call Civil Engineering Services. Over the years, the City ofDowney has exemplified acommitment to progress and community development that we deeply admire, We believe that our experience, dedication and team have what it takes to support and contribute to the City's continued growth.

ABOUT US. BKF is a full -service consulting engineering and survey firm with more than 108 years of experience in public works engineering. BKF's decades of engineering, surveying, and planning experience is evident in our legacy projects throughout the West Coast. By leveraging our diverse project portfolio in combination with innovative design solutions, BKF's team of more than 470+ experienced staff is dedicated to successfully delivering sustainable projects for our communities.

EXPERIENCED TEAM. Our Team members have recently worked on similar public improvement projects within each specialty category that we are proposing, including the City ofDowney's Lakewood/Florence Intersection Improvement Project, Florence Ave Bridge over the San Gabriel River, Florence Avenue over 0o Hondo Channel Rehabilitation Project. Additionally, we have been working on similar projects in the City ofSouth Gate, Santa Fe Springs, and Pico Rivera, Our Water Resources Team is currently working with the City of San Clemente, County of Orange, and the City ofNewport Beach mnamultitude ofdrainage and water quality projects. .VVehave included the same team working on these similar projects to ensure continuity and to streamline project deliverables. 8KF has assigned experienced Project Manager's for each specific category to ensure the policies and procedures set by the City are followed and a quality deliverable is ensured, We included our hand-picked team of trusted subconau|tantsthat we have worked alongside for over e decade to bring value tothe City and its partners.

As Principal and Vice President, I have full signing authority and am authorized to bind to the terms and conditions of this proposal. We look forward to continue working with the City of Downey and continue providing services to improve infrastructure, | will be the primary point of contact during the proposal discussions and | am available to expand on any portion of our proposal. I can be reached via email or phone at cricleout@bkfcom or (949) 526-8462.

Sincerely,

EKE ENGINEERS
Chris Rideout, PE
Principal / Vice President
FdROF92141HUM
4675 MacArthur Court, Suite 400,Newport Beach, CA 926601c949.526.8460

TABLE OF CONTENTS
� MANAGEMENT& ORGANIZATION
Finn Profile
1 Executive Summary
2 Similar Project Experience &[}n-Ca|i Contracts
3 Relevant Project Experience
4 Change Order Data
6 Organizational Chart
7 Key Personnel Resumes
8 Subconau|tantPro0|es
11 SubconauitantResumem
12 Project Management-Typica| Project Approach
14 Typical Scope ofServices
16 Fee Schedules
21 Project Controls 25
Quality Assurance / Quality Control Plan 26
� SUPPLEMENTAL INFORMATION
Sample Certificate ofInsurance 27
Litigation History 28
IN

STATEMENT OF QUALIFICATIONS
1^ MANAGEMENT & ORGANIZATION

FIRM PROFILE
Since 1915, BKF Engineers earned a reputation for its ability to successfully 9|aq design, survey, and implement complex projects.

We draw upon and utilize our experience diligently guiding project from the initial due diligence and feasibility stages, progressing project designs and permitting approvals, and concluding with construction and implementation, This proven approach recognizes that developing dynamic projects isinformed bvfocused team collaboration, mitigating physical constraints and potential risks, and balancing designs goals with value engineering solutions,
Through our network of 16 west coast offices BKF provides civil engineering, land surveying, and|andp|anningaerviresfurgovennment agencies, institutions, developers, design professionals, contractors, Utility and Flood Control District, school districts, and corporations.

Facilitating the unique permitting and expertise requirements of projects, we provide a number of specialty services' including Agency permit expediting, sustainable infrastructure, site accessibility consulting, hydrology/hydraulics, traffic signal and traffic handling designs' utility locating services, automated construction surveying monitoring, and 3D laser scanning.

FIRM INFORMATION
SE[\1VICES
° Civil Engineering M Water Resources
* Surveying " Construction
° Planning Management
* Transportation . Utility Locating
BKF Engineers
4675MacArthur Court, Suite 400,Newport Beach (A 92660
Ph. (949) 526-84601 Fax(949) 526-8499
www.bklcom
�
Chris Rideout'PE, Principal inCharge (949)526-84G21crideout0Dbk[com California Corporation 1O5/26/197D1Entity No. [O599256
Chris RideoutPE, Principal inCharge [ANu.44922
Sheila Ampao\PE, QSC\Project Manager [ANo,78DO3
Jason Kirchmann,PLS,BE, QA/Q[K4anager PLS:[ANo. U806,PE: [ANo. 78O79 Dan ViUioes,PE, Q5D,Drainage Lead CANo.5G210
Roger Chung, PE, CFM,ENV SROSD/QSP, CANo.65388
Water Resources Lead
Nate Parker, PLS,Survey Lead LANo.9813
City ofDowney | RFQ No 23-002
On -Call Professional Civil Engineering Services

STATEMENT OF QUALIFICATIONS

EXECUTIVE SUMMARY
For the City's On- Call contract, BKF Engineers offer the following-, BKF Engineers will assist the City with the design work for projects including: street improvements and intersection widening,- pavement and infrastructure rehabilitation and reconstruction; water, sewer, and stormwater infrastructure improvements; water well and water treatment improvements; strmetacape enhancements; green street projects; drainegeinfraatructure; and sidewalk, curb ramp and other pedestrian circulation improvements, These projects wiUbemanagedusingBKF'sprovenprojectmenagementprucess:
= Partnering toestablish priorities
* Defining a detailed work plan
* Mobilizing and validating parameters
* Monitoring progress
* Delivering the project.

EKE Engineers recognizes that an organized On -Call project delivery approach is critical for projectsuccess.

We understand that managing, building consensus, and obtaining project approvals and permits are often more challenging than preparing the actual design documents. Ensuring that these processes are managed will allow projects to be delivered on schedule and within budget. COMPOWENT1: Manage the Process. COMPONENT 2, Define Critical Issues. COMPC}NENT3, Develop Coordinated Design Documents.

COMPONENT4.- Validate Implementation.

Our sample scope of services, presented herein with a list of deliverables for each phase, can and will be revised, according to the needs of each task order issued by the City.

BKF will assign task orders for the City of Downey out of our Newport Beach office. Since 2008 BKF has worked on over 100+ projects in Southern California including roadway, pavement bridges, utilities, drainage, parking, and parks and recreation, The 8KFteam |scomposed ofskilled professionals with well- rounded experience. The BKF team highlighted in this proposal have worked with each other on numerous similar projects together, as well as each of the as -needed subconau|1antm we have brought on board to contribute their specialty expertise, including:

LSA| Environmental Services WGZE |TraGGc Engineering & Street Lighting DYA| Geotechnica| Engineering C Below Potholing
N|G|Landscape Architecture Aerolec6Mapping Inc. | Aerial Survey BKF Project Manager Sheila Anmpamu has more than 20yeao of civil engineering experience in roadway design, grading, and highway/bridge projects with municipal agencies msthe project engineer, design manager, and project manager. Sheila has led the design efforts for roadway geornetrics, grading, signing and striping, stage construction and traffic handling on a number oflarge transportation projects and understands the importance of strong, clear communication when itcomes tu meeting project goals to ensure timely and accurate execution ofproject de|ivenab|es.

City ufDowney |RFQNo. I3-002 Wo
On -Call Professional Civil Engineering Services 2 �14 rald

STATEMENT OF QUALIFICATIONS

SIMILAR PROJECT EXPERIENCE
CLIENT

PROJECT TITLE

CONTACT

DATES OF

ENGAGEMENT
6 Downey On -Call Civil Engineering Services
a
Florence Avenue Bridge Over Rio Hondo
Gutierrez, PE
Channel Rehabilitation Project
Prim
Principal Civil Engineer
City of Downey
M
San Gabriel River & Wilderness Park
(562) 904-7110
2016 - Ongoing
Downey S Parks Project
<[email protected]
0 Downey On -Call 2018-2020
0 Downey Lakewood Florence Intersection
W
Pico Rivera Regional Bikeway
Kenner Guerrero
City of
x
Telegraph Road Bridge
Associate Engineer
2018 - Ongoing
Pico Rivera
x
Mines Avenue Parking Study
(562) 801--4351
8 Whittier Boulevard Bridge Feasibility Study
[email protected]
George Alvarez
City of Sari
.

San Juan Capistrano Consulting Services
Project Manager
2020 -Ongoing
Juan Capistrano
2020-2022
949--443--6351
[email protected]
n
Santa Fe Springs On -Call Engineering
Noe
City of
Lakeland Street Improvements
c Works it
Public Works Director
Santa F� Springs
�
Bartley Ave. Street Improvements
(562) 455-5680
2016 - 2018
R
North Residential St. Pavement
nocnegreteCsantafesprings.org
Improvements

SIMILAR ON -CALL CONTRACT EXPERIENCE

CITY OF CHINO CITY OF CHINO FALLS
On Call C ngineering On Call F ngineering
CITY OF ANAHEIMt PUBLIC UTILITIES
On Call Civil Services

CITY OF IRVINE
Or Call F ngineering Services

COUNTY OF SAN BERNARDINO
Civil Lngineering Services

CITY OF LAKE FOREST
On Call Contract Services
City of Downey I RFQ No. 23-002
On -Call Professional Civil Engineering Services 3

STATEMENT OF QUALIFICATIONS

RELEVANT PROJECT EXPERIENCE
Lakewood Boulevard and Florence Avenue serve as key mobility elements connecting major Interstate freeways and also provide access to local employment, entertainment, shopping, government offices and other facilities. The Lakewood Boulevard atFlorence Avenue intersection currently accommodates anaverage daily traffic (4DT)volume ofapproximately 72,OOO vehicles per day (VPC). The traffic volume at the intersection is expected to increase by 26% to approximately 91,000 VPD by year 2035. The purpose of this project is to improve traffic circulation and mobility within the 1-605 Freeway corridor by minimizing congestion along the Lakewood Boulevard and Florence Avenue corridors by adding capacity and improving the operation of the Lakewood Boulevard and Florence Avenue intersection during peak hours by the year 2035, through a series of improvements to the intersection. BKF Engineers isproviding engineering services consisting mfthe environmental, PS2kE, utility relocation and right of way engineering phases of the project. Project features include dual left -turn lanes in the southbound and northbound directions along Lakewood Boulevard; Exclusive westbound right -turn lane on Florence Avenue; Right of way acquisition as necessary to accommodate the additional left and right turn lanes; Relocation of overhead utilities; Reconstruction of intersection with concrete pavement; Traffic signal modification; and Incidental striping, signing and pavement markings.

DATES OF SERVICE PROJECT STATUS
2019 Ongoing Design Ongoing
BIKE Engineers isleading the civil design for the Pico Rivera Bikeway Project, a tS-mile bicycle facility that will add a connection over the San Gabriel Rive:

The projectindudesaOass|bikepatha|ongK4inesAve.fnomtheRioHondo Channel tothe San Gabriel River, a new bridge structure located north of Mines Ave. spanning the San Gabriel River and Class | and U bike lanes along Dunlap Crossing Rd. from the San Gabriel River toNorwalk Blvd. Additionally, there is a complete streets improvement along Mines Avenue from the Rio Hondo Channel tothe San Gabriel River. The improvements on Mines Ave. include but are not limited to: pavement reconstruction; installation of bioswm|es� reconfiguration of parking lanes; upgrading street lights; traffic signal modifications at Rosemead Blvd and Mines Ave; and landscaping.

DATES OF SERVICE PROJECT STATUS
2018-2023 Design Complete

REFERENCE
City of Downey
DesiGutiernez PE
Principal Civil Engineer
(562) 904710
[email protected]

REFERENCE
City ofPico Rivera
Kenner Guerrero
Assistant Engineer
Ph. (562)801-4351
City ufDowney |RFQNo. 23-002
On -Call Professional C|vi|EngineermgServices 4 m�0�|

STATEMENT OF QUALIFICATIONS
The Project indudesthenoadway,sidewa|kandADAcurbramPimpro«ement ofthe local streets atthe westsidemfthe City ofSouth Gate. Tothe maximum extent practical, the design shall consider sustainabi|ity in pavement technologies, air quality, storm water treatment water conservation, green streets technologies, complete streets, etc, BKF Engineers was selected to provide professional services, including preliminary engineering, surveying, civil design, preparation of plans, specifications and estimates (PS8lE), assist during Construction Bidding Phase, provide Construction Support and assist inProject [|oseoutfortheCitywideResidenha|ResurfadngProject.

DATES OF SERVICE PROJECT STATUS
8KFwhhtheProectTeamdeveloped ascenario that optimized the intersection traffic operations beyond the alternatives and scenarios identified in the RFP, and developed the Geometric Approval Drawing (GAD), preliminary design plans, and prepared the Project Report, Environmental Document, Preliminary Water Quality Management Plan. As part of the Project, traffic simulations were created for the Preferred Alternative/Scenario to be used during the Transportation and Planning Commissions, and the City Council, BIKE also prepared right of way exhibits for each property impacted by the project improvements, which were used to discuss the project with the property owners.

DATES OF SERVICE PROJECT STATUS
2020 -2022 Design Complete
The intersection of Los AJisos Boulevard and K4uidands Boulevard is within s residential and community/regional perk area, with Los A|isoa Boulevard classified as a Major Arterial and Muidands Boulevard as a Primary Arterial, With K;u|dands being heavily travelled and used as an alternate route to the Interstate 5-Freeway during peak hours, the City saw the need and intends to construct second left turn lanes for all legs of the intersection, In order to accommodate the dual left lanes for the LoaA||sus Boulevard/ Muir|ands Boulevard Intersection Improvements Project.. With the build -out conditions at the intersection of Loa A|isoa Boulevard and k4uidands Boulevard, the opportunities for the widening occur on the east side of K4uir|ands Boulevard impacting the Los AUsosIntermediate School and BToro Park on the upstream side ofthe Muir|andsBridge over the Los A|iscisCreek.

DATES OF SERVICE PROJECT STATUS
2021 -- Ongoing Design Ongoing

REFERENCE
City of South Gate
Kenneth Tang, PE,
Project Manager
Ph�(323)56]-9574

REFERENCE
City ofIrvine
Cheryl Lea
Senior Transportation Ana|yst
Ph. (949)724-7313

REFERENCE
City ofLake Forest
TranTron
Traffic Engineering Manager
Ph. (g44)467-3485
City ofDowney | RFQ No. I2-002
On -Call Professional Civil Engineering Services 5 wMCA

STATEMENT OF QUALIFICATIONS
DESIGN CHANGE ORDER D/\T/\
Based onthe 8KFdesign scope mfthe work performed for the following public agencies the change order data isaafollows:

ORIGINAL ESTIMATE CURRENT CONTRACT FINAL EXPLANATION OF DEVIATION AND PROJECT NAME CONSTRUCTION��PPR��JECT BUDGET AMOUNT CHANGE ORDER

COST AMOUNT
�
City of Downey Alternative designs toreduce right o[way impacts, additional row arquisibnnservices vv*reneeded to
Lokewoo6/Florence|»te�nctio» $395'282 $555'422 |» Design Phase support the new geometry and added vibration analysis Improvements Projects due tosensitive equipment atright ofway.

City yfPico Rivera C�angeinscopean66es�n�6an�eo=�6
$1�5�496 $1 590 214 |n Construction Phase environment
Pico Rivera Regional Bikeway Pn�ect ' ' pedestrian bridge City mfSouth Gate C�ya66e�10mi�sofme6��reha6i|�at�n �a�� $275�58 $793211 In '
Residential Resurfacing Phases | & || ' impmvementn.an6 concreteHatwork City of Irvine Scope and fee were negotiated prior to contract being PR/EDfor Jamboree/Main Intersection $323.803 $347,271 In Design Phase signed, current contract amount reflects the negotiated Enhancement Project fee and therefore nochengnnr6erswenenee6ed City of Lake Forest
City added 6io-infiltration system, second pedestrian
Los AksosBou|evanJ/Muir|an6s
$636'089 $832'954 In Design Phase bridge, frontage area improvements for Los Aksos Boulevard Intersection Improvements |ntermediateSchool, and 3Drendering.

Project
City ufDowney |RFQNo. 23-002
On -Call Professional [i"i|EnQineenng5ervices 6 mom

STATEMENT OF QUALIFICATIONS

ORGANIZATIONAL CHART
The organizational chart presented below displays our proposed team organization, depth of resources, and coordination between team members available tothe City ofDowney. By assigning seasoned engineers and surveyors, BKFvvi|| assure a thorough work product, e cross-pollination of design expertise, and effective management of the project as necessary.
/_���/ �� [l{�\4/D�� ~~'^J `~' Downey
City ufDowney | RFQ No. 23-002 RP
On -Call Professional Civil Engineering Services 7 400a

STATEMENT OF QUALIFICATIONS

KEY PERSONNEL RESUMES
�����U� �����������
~�" °"^"=~ °~"�=°_��~� ", NE

PRINCIPAL -IN -CHARGE
Chris Fjdeou1 has more than 36 years of design
experience on numerous s1naetscape\ roadway, utility
infrastructure, and municipal improvement projects. He
has been able to develop strong relationships with the
|ocal and regional approval agencies throughout his
career, which helps with obtaining timely jurisdictional approvals. His strengths include providing creative
alternatives with amaximum amount offlexibility during
the design, while maintaining the project objectives
and schedule.

City ofDowney Experience
City mfDowney On -Call Civil
Engineering Services 18-20
Downey Lakewood Florence
Intersection Improvement
Project
Apollo Park
Dennis the Menace Park
Rio San Gabriel Park
Florence Avenue Bridge
Over Rio Hondo Channel
Rehabilitation Project
Add|t|oma|ReJevamt
Experience
Benson Avenue Storm Drain
Extension
Chino. [A
Chino On -Call Civil
Engineering, 2020 2021
Chino, [A
Chino Hills Parkway
Rehabilitation Projects
Chino Hills, [A
Chino Hills On -Call
Engineering
Chino Hills, CA
Los Alisos0bd/Mu|dumds
Blvd. Intersection
Improvements Project
Lake Forest, [A
South Gate Residential
Resurfacing |&||
South Gate, CA
South Gate E. Frontage Road
Pavement Rehabilitation
South Gate, CA
Pico Rivera Regional
Bikeway
Pico Rivera, CA
PR/ED fmrJambmree/K8ain
Intersection Enhancements
Irvine, CA
Jeffrey Open Space Trail
(JOST) Extension
Irvine, CA
Trabvco/Rem|ngtonTraffic
Signal
Irvine, CA

SHEALA AMPARO

PROJECT MANAGER
Sheila has over 22years ofcivil engineering experience
in roadway design, grading, and highway/bridge
projects with municipal agencies, as the project
engineer, design manager, and project manager, Sheila
has lead the design efforts for roadway geometrics,
grading, signing and striping, stage construction and
traffic handling. She will oversee all the geometric
design, and ensure that coordination among the team
members are consistent and clear.

City of Downey Experience
City ofDowney On -Call Civil
Engineering Services208-
2D30
Downey Lakewood Florence
Intersection Improvement
Project
Apm|!m Park
Dennis the Menace Park
Golden Park
Rio San Gabriel Park
Wilderness Park
Florence Avenue Bridge
Over Rio Hondo Channel
Rehabilitation
Florence Avenue Bridge over
the San Gabriel River
San Gabriel River&
Wilderness Park Restoration
Additional Relevant
Experience
Chino On -Call Civil
Engineering, 202Q-2021
Chino, CA
Pavement Reconstruction &
Rehab onPhillips Blvd.

Chino/Montclair, [A
Chino Hills Parkway
Rehabilitation Projects
Chino Hills, [A
Chino Hills On -Call
Engineering
Chino HiUKCA
Los Alisos Blvd/Mmfdands
Blvd. Intersection
Improvements Project
Lake Forest, CA
South Gate Residential
Resurfacing I6Q|
South Gate, [A
South Gate E.Frontage Road
Pavement Rehabilitation
South Gate, CA
Pico Rivera Regional
Bikeway
Pico Rivera, Q\
Whittier Bridge Study
Pico Rivera, CA
Jeff reyOpen Space Trail
(JUST) Extension
Irvine, CA
City ofIrvine On -Call
Engineering Services
2O22-2D25
Irvine, CA
City ofDowney |RPQNo. 23-002
On -Call Professional Civil Engineering Services 8

STATEMENT OF QUALIFICATIONS

KEY PERSONNEL RESUMES
D������ ��U���������K�
~*,~~���"� °~."~=�^."�"���=°=, PE, PLS

QA/QC MANAGER
Jason has awide variety ofexperience incivil engineering design for local municipalities and private sector clients, Hehas provided design support and project management
on civic, healthcare, residential, education, parks, and commercial projects, Jason has been responsible for
surveying tasks related tothe design and construction
of transportation, residential, commercial and public
works projects. He brings a keen sense of urgency to
projects, consistently demonstrating the ability to stay on schedule and within budget,
Additional Relevant
Experience
American Canyon On -Call
Professional Services, Design
Services and Surveying
Services2023
AmericanCanyon, CA
CaUstmgaK8aster
Professional Services
Ageement(2D23'28)
Ca|istnga'CA
City ofSan Rafael Master
Services Agreement (Civ|H
San Rafael, CA
Sonoma County Fairgrounds
On -Call Services
Santa Rosa, CA
Town of Corte Madera Plan
Check Services
Corte Madera, CA
Town nfCorte Madera On -
Call Surveying
Corte Madera, C4
Merin CCD On -Call Civil
and Survey
Novato, CA
CoaummeaSurvey On -Call
Elk Grove, CA
Vallejo Flood and
Wastewater District On -Call
Land Surveying
Vallejo, CA
Delta Lane Staking
West Sacramento, [A
West Sac On -Call Survey
(2O21-24)
West Sacramento, CA
Butte Co. ROW/Survey On -
Call (2O21-2025)
OnaviUe,[A
Mill Valley Path and
Boundary Survey
Mill Valley, CA
K8adnCounty Parks On -Call
Survmys2O2O
San Rafael, CA
Novato On -Call
Novato, CA
County of Sacramento
Map Review
Sacramento, CA
Sacramento County On -Call
Land Surveying Services
Sacramento, CA
City ofSan Rafael Survey
and Plan Check
San Rafael, CA
������ ��W� � �����«�
�°~°= � "��°"°���» PE QSD

DRAINAGE TASK LEAD
Den offers more than 31 yeas of professional civil
engineering experience in the technical field of water
resources. His experience includes hydraulic and
structural analyses for the preparation of design plans, specifications and cost estimates for retaining walls, flood walls, dams, detention basins, water supply, wastewater, and flood control facilities. Den has been involved in the structural analysis, design, and construction of several hydraulic based projects in Southern California.

City mfDowney Experience
City ofDowney On -Call Civil
Engineering Services 18-2Q
Downey Lakewood Florence
Intersection Improvement
PR/ED fov]amboree/Main
Intersection Enhancements
Irvine, CA
Jeffrey Open Space Trail
(JQST}Extenmion
Irvine, CA
Apollo Park
Harvard/Michelson
Additional Relevant
Intersection Improvements
Experience
Irvine, CA
Benson Avenue Storm Drain
Hicks Canyon Channel
Extension
Drainage Study
Chino [A
Irvine [A
Russell Avenue Water Main
City ofIrvine On -Call
Line Replacement
Engineering Services22-25
Chino, [A
Irvine' CA
Pavement Reconstruction
Pico Rivera Regional
and Rehabilitation oo
Bikeway
Phillips Boulevard
Pico Rivera, [A
[hino/Montdeir,CA
Sun Bernardino County
Chino On -Call Civil
Flood Control District On-
Eegineering'282O 2021
CaUFY22/23 FY26/27
Chino, CA
San Bernardino, [A
Via Montego Storm Drain
Extension
San Clemente, CA
Del AmmStorm Drain
Channel, |-196
Torrance, CA
San Bernardino Valley Water
Conservation District On -
Call Professional Genjcas
Redlands, CA
South E| Monte Civil
Engineering Services
South BMonte, [A
City ufDowney |RFQNo. 23-0N2
On -Call Professional Civil Engineering Services 9
IN

STATEMENT OF QUALIFICATIONS

KEY PERSONNEL RESUMES
ROGER�������
n���~�~~,~ ~�, ,~°"�,�» pF CFM, ENV SP QSD

WATER RESOURCES TASK LEAD
Roger has more than 23 years of civil engineering
experience with expertise in hydrology, hydraulic and
structural analysis for the preparation of drainage
studies, drainage master plans and the preparation of
design plans, specifications, and cost estimates for water supply and flood control facilities. Hehas been involved inthe hydraulic analysis and design ofnumerous water
recharge and flood control projects in San Bernardino,
Riverside, Orange, Los Angeles, and San Diego County
including coastal cities.

Additional Relevant
Experience
Benson Avenue Storm
Drain Extension
Chino [A
Chino On -Call Civil
Engineering, 2020 202
Chino, [A
County of San Bernardino
Carbon Canyon Channel
Improvements
Chino Hills, [A
South Gate Residential
Resurfacing I&8
SouthGate, CA
GSA #10Anaheim Hills
Underground Civil Base Maps
Anaheim, CA
GSA#4FY20/21On-Call Real
Property Services
Anaheim, CA
GSA#GFY2Q/21Civil Base
Map @ Real Property Services
Anaheim, CA
City ofAnaheim, Public
Utilities Department, As -
Needed Services
Anaheim, CA
Jeffrey Open Space Trail
UOST Extension
|mine,[A
Harvard/Michelson
Intersection Improvements
Irvine, CA
Los Nisos0|vd/KAuidands
Blvd. Intersection
Improvements Project
Lake Forest, [A
Pico Rivera Regional
Bikeway
Pico Rivera, [A
Washington Boulevard
Bridge Project
Pico Rivera, CA

NATE PARKER

SURVEY TASK LEAD
Nate Parker has over 20 years of experience in field
surveying. He is a registered Professional Land
Surveyor. His project experience covers all aspects
of field surveys including boundary, topographic,
ALTAyurveya settlement and movement studies; and
construction surveys involving subdivisions, high-rise
buildings, bridges, grade separations, highways, utility layout, railroad layout, port surveys and airports. He
handles all aspects ofboundary, control, construction
and topographic data collection,
City of Downey Experience Pavement Reconstruction
amd��hsbonP�i||ips�|v�
OtyofDowney (]n-[aUC�i| .

Engineering Servicea70-2O [hinm/K4ontdair,CA
Downey Lakewood Florence Chino On -Call Civil
Intersection improvement Engineering
Chino, CA
Apollo Park
Chino Hills Parkway
Dennis the Menace Park Rehabilitation Projects
Golden Park Chino Hi||s.[A
�m�m��bh�P�,k
�hino0!bOm�a||
Engineering
Florence Avenue Bridge
Chino Hills, C&
Over Rio Hondo Channel
Rehabilitation
Los AJismsBlvd/Muidands
Blvd. Intersection
Florence Avenue Bridge over
Improvements Project
the San Gabriel River
Lake Forest, Q\
�m�a���ve�
YmrbaUnda��d � South Gate Residential
Wilderness Improvements Resurfacing |&U
��rk�e��on*b�m
Y�rhaLinda'[A South Gate, CA
0ngsdleAvenu
Resurfacing
Redondo Beach '[A
Sam Bernardino Valley Water
Conservation District On -
Call Professional Services
Redlands, CA
C)CPVVOn-Call Flood
Control Services2023-2O26
Santa Ana, [A
Additional Relevant
Pico Rivera Regional
Experience
Bikeway
Chino Airport ROW &
Pico Rivera, [A
Land Surveying
Jeffrey Open Space Trail
Chino,[A
(JOST) Extension
Benson Avenue Storm
Irvine, CA
Drain Extension
City ofIrvine On -Call
Chino, CA
Engineering Services 22-23
IrOne, CA
City ufDowney |RFQNo. 23-002
On -Call Professional Civil Engineering Services 10 mdOISA

STATEMENT OF QUALIFICATIONS
SUBCOK]SU[T/\NT FIRM PROFILES
LSALSA|EmirmnmentalServcea
Environmental p|anning and [EOA
documentation have been the
cornerstones of LSAs professional services since the
firm was founded in 1978 and continue to be their
key practice areas. LSA has operated as a full -service environmental planning and impact assessment firm
with strong in-house technical support services covering the majority of the areas necessary to prepare and/or
review environmental documents,
DIAZ YOWRMAW0&ASSOC
Oiaz//ourman & Associates
(DYA) is a privately held geotechnica| consulting
services corporation, founded in December 1992. We
provide expert geoterhnira| design, environmental,
construction, and forensic services to public agencies, owners, and the U.S. Government for a wide array of
project types, including highways, streets and roads,
bridges, rail, grade separations, bike paths, and other transportation infrastructure" ports, harbors, and
airports" water treatment plants, reservoirs, pipelines, and pump stations; commercial and industrial buildings; and schools, hospitals, and other facilities,
k4|G's landscape professionals are
accomplished in providing a full range of services
including: parks condition assessments; parks/trails
master planning; spurts parks; dog parks; skate parks;
stneetscapes; playground equipment inspections;
feasibility studies; irrigation design and water audits; opinions cfprobable cost schematics and renderings, -
digital visualizations; reporting and presentations,- peer review ofPS&Es: preliminary design; final design PS&Es; public bidding and construction support services; post
construction evaluations and on -call services. They
bring their 8rmwidedepth ofknowledge and experience
to Chino.

WGZE|TimfficEngineerng
VKG. Zimmerman Engineering,
Inc. (WGZB has extensive years of
experience in working with City agencies as well as
community groups. They understand the issues and
concerns of residents, community groups, and public
officials involved in city projects. TheirscopevviU involve traffic engineering, traffic studies and project funding. � �EA ��\�! U��yLocating +
*BELOW PmAhmUng
C Below is California's leading
provider of subsurface imaging and utility locating.

They utilize advanced, non-destructive methods to
provide better vision through hard surfaces like soil,
concrete, asphalt. Their Ground Penetrating Radar &
Electromagnetic Location services prevent unexpected
setbacks in many construction projects, allowing the
client towork safely and avoid costly damage toexisting infrastructure. Aseforerunner inthe field ofGPR,SiteSuan uses only the most current and advanced technology.

AEROTECH MAPPING, INC |Aerial
Surveyn0
For the past ZO years, AenoTech
Mapping (ATM) has supplied high -quality geuspatia|
solutions, services, and support for the A/E/[ induotry.

They have completed projects across the United States
and abroad using the latest technology and resources,
combined with mhighly educated and experienced staff.

Their mission is to bring their clients the highest quality geospetia| products and services available.

ATM has a diverse group of geospeda| professionals
with over 200 years of combined experience in the
photogrammetric industry. With over 10,000 completed
projects todate, their team has the expertise tobring the clients projects to life, In addition, their state-of-the-art facilities and equipment improve their efficiency, thereby reducing their schedule times, soyou are not waiting on your mapping consultant.

City ufDowney | RFQ No. I3-002
On -Call Professional Civil Engineering Services

STATEMENT OF QUALIFICATIONS
SUBCOK]SU[T/\NTRESUMES
DEBORAH PRAC|L|0|LSAUEnvironmental Task Lead
-
-
Re|evan¢ProjectExperlenow
=
Ms. Praci|io is an expert in the management, preparation and processing of documents pursuant to NEPA and CEQA. With more than 35 years of experience, she has been responsible for project oversight as Principal in Charge and preparation and project management of[EQA' and NEPA-mandated environmental documents for land use, institutional, and capital improvement projects, as well as for numerous controversial transportation and land use projects. Ms. Prad|io brings her substantial experience with transportation projects and extensive knowledge ofFHVVAand [a|trmns requirements and procedures to projects, She isalso experienced with federal and State resource/regulatory requirements related to protection of environmental resources, S. NYRAWJANAN, PE' GE Y D|AZYOURMAN & AS6OC|/ADES | Geotechnica| Task Lead EDUCATION I Master of Civil Engineering, Civil
Engineering, Washington State University, Pullman &
B.S., Civil Engineering, University of Peradeniya, Sri Lanka REGISTRATION I Civil Engineer, CA No. 67023,
Geotechnical Engineer, CA No. 2819
Relevant Project Experience
= Lakewood Florence Intersection Improvement Project
= EFrontage Road Pavement Rehabilitation
° Rosemead Complete Streets Project
° Irvine Trobuco/RemingtonTraffic Signal
° Pavement Rehabilitation North Residential Streets
" Jeffrey Open Space Trail (]OST)
= Park Place Extension
Mr. Nira janan is e registered geotechnica| engineer with over 20years ofproject experience, including street and highway improvements, bike paths; pavement evaluation and rehabilitation; sound walls and retaining walls; bridges and grade separations; other transportation projects; stormdrainsandwaterinfrastructureandbu||dingm.

He has coordinated, performed, or directed gmotechnica| investigations for well over 800 projects in Southern California. He has practical experience in all aspects of geotechnica| engineering, including site selection, field investigations, engineering analyses, Beotechnioa| recommendations, preparation ofgeotechnica| reports, and construction observation and testing,
EDUCATION I B.A,, Landscape Architecture,
UC Berkeley
CA No. 1771
Relevant Project Experience
* Firestone Boulevard Streetzcape
* Apollo, Golden, Dennis the Menace, and Wilderness
Parks Renovation
° Santa Ana Dog Park atCentennial Park
° Ponderosa Park and Family Center
" Anaheim Coves Phase | and U
" Anaheim Urban Greening
Steve Lang is an award -winning landscape architect who has dedicated his career to creating outdoor environments that offer memorable, positive connections for people to each other and to nature. His early artistic talents converged with his love for the spaces beyond building walls to forge a 40-year vocation. Licensed in four states, Steve's work can be found around schools and sports fields, in forests and downtowns, through plazas and parks and along streets and waterways, He believes there is a deeper story to every project, and he strives to bring it to the surface through interpretation, education and art.

City vfDowney | RFQ No. 23-002 P�|
On -Call m Professional Civil Engineering Services 12 �&�

STATEMENT OF QUALIFICATIONS
SUBCOK]SU[T/\NTRESUMES
BILL ZIMMERMAN, i�)E, TE, PTOE WGZE Traffic Task Lead
EDUCATION I B.S., Civil Engineering, University of
Colorado, Boulder
REGISTRATION I Civil Engineer, CA No. 48667, Traffic
Engineer, CA No, 2254
Relevant Project Experience
* As -Needed City Traffic Engineer, LaMirada, [A
° As -Needed City Traffic Engineer, Signal Hill, [A
° As -Needed Traffic Engineer, Seal Beach, CA
° As -Needed Traffic Engineering ServicesDowney, CA
= As -Needed Traffic Engineering Services, South Pasadena, CA * As -Needed Traffic Engineering Services, Mission Viejo, CA * On -Call Engineering Services, Norwalk, CA
Mr. Zimmerman has over 30 years of experience in transportation and municipal engineering projects, His professional experience includes highway/arterial planning and design, commuter/heavy rail planning and design, local street design, municipal engineering, transit station design, traffic management and operation systems, ITS and communication system design, and traffic studies. Mr. Zimmerman has also provided project management,project engineering, and design of several state and local highways/roadway projects. His Federal funding management experiences includes: HBRR, STPL, HES, IMD, SRTS, Seismic, Discretionary, and ARRA, HSIP, and BTA, He has served asInterim City Engineer, Public Works Director, City Traffic Engineer,andprovidedCityStaff Support HECTOR VAkRGAS I BELOW �Potholing Task Lead
CERTIFICATIONS � Ground Penetrating Radar
Technician, Level III & Utility Locator Technician, Level III
Relevant Project Experience
= Metro Division 2OUtility Locating and Mapping
Investigation, Los Angeles
" 1-10[orhdor Potholing and Slot Trenching Investigation 5 SR-55VVidening Project
. City ofOntario Potholing Investigation, Grove/Holt
~ Lambert Road Potholing Investigation
~ Highland and Ceder Potholing Investigation
Hector has over 16years of experience in the construction industry 10 of which he has dedicated to the utility locating industry. Hehas worked asasales representative, aproject manager,enda|eadsupen/isor.Thesedifferent roles have given him a well-rounded knowledge of the industry from project inception to project completion. He can step in and help our Lead Surveyor and Field Manager with daily requests and large projectneeds.Heoversees the coordination of all office and field efforts within the project limits to ensure the highest standards for utility location accuracy.

ERIC PHAN, PLS, Cp PLA | AEROTECH MAPP�N(5 INC | Aerial Survey Task Lead EDUCATION I B.S., Geomatics Engineering, California
State University, Fresno & B.S., Survey Engineering,
California State University, Fresno
REGISTRATION I Professional Land Surveyor
in Arizona, Nevada, and New Mexico. Certified
Relevant Project Experience
= City ufSan Diego Aerial Surveying
* City mfElk Grove Aerial Surveying
* City of Anaheim Aerial Surveying
Eric has been working in the surveying and phntogrammethc industries for over 24years and brings a wealth of knowledge and professional experience to the company. Well versed in all disciplines of surveying and phutognammetry. Eric has successfully managed over 1,SUOsurveying mapping projects during his distinguished career. His software experience includes: Trimble CPS Equipment and Software, ESR|'sArcG|S/|nfo, Intergraph's K4icrmsiadon Site Works, Autodesk Civil 3D products, 0tna[AM Essential AeroTriangu|ation & [)rthmphotogmphy, Summit Evolution SmftcopySva1em.

City of Dn*oay | RFQ No. 23-802
On -Call Professional Civil Engineering Services 13 �m��

STATEMENT OF QUALIFICATIONS

PROJECT MANAGEMENT

TYPICAL PROJECT APPROACH
BKF Engineers recognize that an organized On -Call project delivery approach is critical for project success. We understand that managing, building consensus, and obtaining project approvals and permits are often more challenging than preparing the actual design documents. Ensuring that these processes are managed will allow projects tobedelivered mnschedule and within budget.

BKFs management philosophy integrates the following key components-, managing the process; defining the critical issues; developing coordinated design documents; and validating implementation, COMPONENT1. MANAG|NGTHE PROCESS
PROJECTWORK When the City identifies ascope specific project, our Principal -in -Charge, -- Chris Rideout, PE will be available to meet and review the Project goals. Based on the specific tasks provided, will assign a team who will be committed to the Project for the duration, We will develop e detailed project work program that identifies tasks and deliverables tailored to deliver the Project.VVeintendfurthis work program to be a living document that we update regularly to reflect the progress and needs of the Project.

DEF|NEEDULVVewjUdeve |oIs ourworkprmgnamwith refenencetpa schedu|ein M ic rosoft P rojectfmmnat Our dedicated Project Managers will update the schedule with the completion of each phase, discuss and gain concurrence with the City. The schedule is a critical tool for the Project Team, City, and other Stakeholders to ensure all agree to the tasks and delivery dates. It is imperative to regularly review the baseline schedule and identify any potential tasks that are slipping behind schedule. If this situation occurs, our PK4s will work with the team toestablish arecovery plan tobring the design schedule back into alignment with the baseline schedule. This recovery schedule will be discussed with the City to ensure concurrence moving forward, I ) F �,, "N !"I" � The BKF team will develop a fee for our services based on the agreed to scope of services and schedule. m COMPONENT2:DEF8N|NG CMTICAL.|SSQES
410 CRITICAL CON8|DE0AJ|DNS- For projects, the Project Team will prepare geometric qP alignment studies to ensure the objective and standards for the improvementsare adequately addressed.

This early establishment and agreement with the City on the geometrics will allow the ProjectTeamhz identify critical issues, such as right of way acquisitions and utility relocations that require lengthy lead times that may affect the Project schedu|eandbudget.

DEFINING CONSTRUCT|()N RISK: Risk assessment is key to managing the overall construction budget, Our experience isthat characterizing subsurface soils and utilities is critical to managing unknowns that could lead to montnactorchangeonderend/orde|aya.8KFwiUworkwithCi1yStafftoidendfvonanyenvinonmenta|considenationy/ mitigations early on in the project to ensure the project stays on schedule and can meet the environmental needs ofthe project asthe design iadeveloped. Comprehensive Construction Staging and Traffic Hand|ingp|ansdepicting vehicle/pedestrian circulation as well as efficient Contractor work areas are critical in clearly showing the intent/limit of any closures,
STAKEHOLDERS: Understanding the concerns of the P ject's stakeholders at the earliest stage in the design process is essential to prevent delays or conflicts. BIKE will coordinate and attend all meetings to understand goals and objectives of all stakeholders and confirm they are aligned properly with the City. Engaging all stakeholders from the beginning of the design process through construction will minimize misunderstandings and will result inaproject that meets all objectives.

City ufDowney |RR2No. 23-0N2
On -Call Professional Civil Engineering Services 14 �,401

STATEMENT OF QUALIFICATIONS
IX COMPONENT 3: DEVELOPING COORDINATD DES|K�NDOCU�4ENTS �[COORDINATION: The communication conduitwhh the CityvviU bewith Shei|a Ampan� PE, QS[\ Project Manager, This single point of contact eliminates possible misunderstandings and duplication ofeffort'This team will be responsible for solving technical challenges while developing the design in accordance with the City's goals. We will coordinate the work with other consultants, Staff, and other agencies to ensure collaboration and obtain Project approvals.

COORDINATING AGENCIES,- BKFs experience with public infrastructure projects has taught the value of having clear direct communication and of being accessible at all times during critical project stages. We believe ourworking relationships with local, state and federal agencies will allow ustu streamline the process by minimizing costly lags in communication.

TECHNOLOGY: BKF imp|ement the latest technology todevelop designs including Autm[ADCivil 3C\VVealso have specialized simulation software to assist inthe design of infrastructure including AutcJurn, StonmC4[lVVetepCA[\ Sewer[A[l HEC HMS, and HEC RAS. For preparation of illustrative exhibits, we have Adobe Illustrator, Photoahup, and |nDesign. All staff has access tuthe most current Microsoft Office applications suite.

COMPONENT 4kVALIDATING |MPLEMENTATiON
_�r INTERNAL <�A/OC- BKF will complete an internal review of all project documents, Under direct �� communication with the assigned Project Manager,]asonKirchmann,PE,PLSvviUcheckthedocuments for errors, perform a constructabi|ity review, ensure our documents are coordinated with other disciplines, and suggest alternatives for cost savings. During this period all consultants onthe team are required to review not only their own work, but evaluate the other disciplines designs to ensure there are no conflicts and design intent imconsistent among the team members.

PROBABLE CONSTRUCTION COST: Evaluating the potential construction cost throughout the Pngect's life is essential tocreate afeasible project. BKF isconsistently involved inthe design and construction of numerous projects each month that provide excellent insight into construction trends and costs. With each submittal, BKF will prepare an opinion of cost to assist in developing a project budget.

VVhhBKF'sfoupcomponentapprmad,adetei|edworkp|en,andcontinuaUymonitohng,mebehevethatpartnehng is both aligned and reinforced, This ensures that the City together with BKF's leadership and the 1eam's technical expertise, will meet its goals and objectives for a successful On -Call experience.

City ofDowney | RFQ No 23<002
On -Call Professional Civil Engineering Services is ���

STATEMENT OF QUALIFICATIONS

TYPICAL SCOPE OF SERVICES
The BKF team is well organized totackle the City ofDowney's needs in a timely manner. VVewill assist the City in developing creative solutions to challenges aswe have done soon previous projects. The continuity and long tenure ofour staff is evidence that the personnel who we have committed to this On -Call will see the various projects through from start to finish. Each team member is cross trained and has a clear understanding of their role for each assignment. This will allow each team member to properly allocate their resources and make the necessary commitments to the project team. The following is a sample of our scope of services and will be revised according tothe needs ofeach project |ssuedbythe[ity

PROJECT MANAGEMENT
» PROJECT MANAGEMENT, As Project Manager, Sheila Ampano, PE, QSD/F, will be responsible for the day-to- day management of the pject design team, including the technical management of the project. » PROJECT NCKC)FF MEET|N(3/PUBL|C OUTREACH/PDT MEETINGS- 8KF will develop the agenda, invite project team members and stakeholders and administer project kick-off meeting. This meeting will confirm project scope, deliverables, schedule, communication conduits, invoicing, and establish future Project Development Team (PDT) meetings. BKFvi|| prepare meeting minutes and distribute to all in attendance for review and concurrence, Our team will attend Project Development Meetings, Public Outreach, and City Council Meetings tosupport City Staff and the convey the Project goa|e. » MASTER PROJECT SCHEDULE/PROGRESS
REPORTS: Upon receipt cfatask order from the City,
wewill provide eProject MasterSchedu|einK4icnosof
Project to the City. The schedule will be updated
and distributed during PDT meetings to confirm the
Project is tracking according to expectations. BKFvviU
prepare progress reports indicating current tasks,
outstanding items, schedule monitoring, and future
anticipated meetings, The progress reports will be
prepared and submitted monthly to the City Project
Manager prior to the 15th of every month for the
duration ofthe project.
» MONTHLY |NVO(QNG:0KFwill collect, review and compile invoices from the design team onamonthly basis and will provide the City with the teams composite invoice, Invoices will delineate the current percent complete bvtask which along with the project schedule can be used to confirm effort, payment, and deliverables are in agreement,
AGENCY AND UflLlTY COORMNATION
» STAKEHOLDER COMMUN|CAT|CJN: We will engage with the project stakeholders during the early phase of work. The BKFteam will reach out and communicate with the project stakeholders, and update the contact person msnecessary. Aspart ofthis effort, wewill:

City ufDowney | RPQ No. 23-002 gw
On -Call Pmfess|ona>Civil Engineering Services 16 A��|

STATEMENT OF QUALIFICATIONS
° Make necessary contacts with districts, parks and recreation or other involved agencies concerning facilities to determine design requirements for the construction mfnew facilities and structures. " Coordinate with all affected agencies, including school districts, utilities, irrigation districts and government agencies, asnecessary,
" Communicate with property owners as necessary.

UT|L|TYRESEARCH AND CC)[}RD|NAT|{}N:C}urstanderdpmcticevvhenstarting enew project istoengegethe ud|kv companies early in the project, and pro -actively work with them to protect their utilities, or to determine ideal relocation routes. We start by establishing the lines of communication with utility companies present within the project area, such as City ofDowney Municipal Utilities Company, Southern California Gas Company, Southern California Edison and coordinate with the City ofDowney Public Works Department as needed, by sending out Utility "A" Letters requesting for their record drawings and as-bui|ts.

Once we have received all the as-bui|tsand record drawings from each agency, we will incorporate the existing facilities into the utility base mapping in AutoCAD format, Upon completion of the utility base mapping, we will schedule a meeting simultaneously with all third -party utility companies in an "all -hands" meeting, At that meeting, we will present the project and identify utilities needing relocation. Most importantly, we will discuss the timeline for when the utility requires relocation to maintain the project schedule. At this "all -hands" utility meeting, these utility companies are able to coordinate with each other and find opportunities to be in joint relocations reducing their construction costs and reduce their relocation schedules.

We will distribute the Utihty^B^ Letters with the composite utility plans, and request that they confirm their existing and future facilities, All the gathered utility information will update our comprehensive utility map and matrix that were used to supplement the project base sheets to provide a complete existing utility base. This level of effort will minimize construction costs and ensure the correct placement of the proposed improvements, As part of the utility coordination work, we will:

N Review and update as -built utility information
° Request utility mapping from all affected utility owners " Update base mapping with existing utility information ° Based onour understanding ofthe utilities and the impact ofour project onthoseuti|ities,weanenut anticipating needing any potholing
" Submit utility maps to impacted utility owners for verification ° Identify potential utility conflicts
~ Coordinate the above work with the utility owners
» DESIGN SURYE\( EKE will establish project controls, both vertically and horizontally, onthe City datum and will set panels for the aerial survey. In areas where more detailed surveying will be required, BKFfie|d crews will conduct a supplemental survey to gather information on critical points (i.e., CL BCR, ECFL flow lines, edge of gutter) grades, utility structures, and other items necessary to complete the design. In addition, using available record information, BKF will review, research, and tie-in the existing right of way for the project|imits.

City ufDowney | RPQ No 23-002
On -Call Professional Civil Engineering Services 17 m���

STATEMENT OF QUALIFICATIONS
Our survey crews utilize Leica and Trimble robotic total stations, Trimble R10GpS receivers, and a Leica [10 fk P40 high -definition laser scanner. Our computers include Dell desktops, laptops, and enterprise servers.

We regularly invest in updates to our hardware and software including a full suite of Microsoft, Adobe, and Autodesk products, Scheduling isdone with Microsoft Project. Our CAD software inc|udesAutoCAD Civil 3D 2021 with AutoTurn, survey, and hydrology extensions. Electronic submittals can be provided in any format.

With the use ofLeioa P40 HDG Scanners, B0F has the ability to collect high resolution point cloud data at 1,000\000 points per second, The data gathered allows the ability to create 3-dimensional models of projects, including as -built surveys, topographical site surveys, roadway and highway surveys, ADAsurveys, buildings, bridges, striping, and utility plants.

Typical Surveying Sepvicesindude
» RECORDS RESEARCH AND FIELD REVIEWS: We will perform site visits with the City Staff, especially its Maintenance Crew and the Design Team, to identify key issues and concerns, that may not be as apparent. This is the opportunity to not only identify key issues and concerns, but identify and determine the scope and limits of work. To minimize construction cost we will work closely with the City staff tm identify critical items of work and satisfy the City's vision in revitalizing its community. We will create an inventory of the field conditions, identifying areas that are non-ADA compliant to make recommendations to satisfy the standard requirements.

As part of this task, a Field Condition Assessment Memo and a Photo Diary will be prepared and submitted. » NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDEG)PROGRAM COMPLIANCE: Ifrequired, our team can prepare an NPDES compliance memo which identifies the applicable NPDES Technical Documents and proposed Best Management Practices (8MPs). Possible Technical Documents may include, but are not limited to, aWater Quality Management Plan, Storm Water Pollution Prevention Plan (SWPPP), orStorm Water Pollution Control Program (WPCP) as required by the Regional Water Quality Control Board, [a|trans, or other state and federal agencies. Adraft NPDES compliance memo will be submitted to the City for review and comments. Upon receiving of the review comments, the comments will be incorporated into the final NPDES compliance memo.

Following NPDES compliance concurrence, the prescribed NPDESTechnica| Documents will be prepared, City ufDowney | RFQ No. 23-002 W!
On -Call Professional Civil Engineering Services 18 �w

STATEMENT OF QUALIFICATIONS
" PAVEMENT INVESTIGATION: On pavement rehabilitation projects, our Team will inhja|k/ perform visual inspections. Based on the visual inspection of the existing pavement, we will identify the cause of any pavement failure such that an effective reconstruction/rehabilitation strategy can bedeveloped. VVewill explore the site's subgnade soil condition and provide recommendations for the structural pavement section, as well as grading requirements for construction ofthe pavement, curb, gutter, and sidewalk.

Should on -site infiltration using BK4PfacUides is planned, wewill evaluate the percolation characteristics of the site soils using appropriate site -specific percolation tests. The feasibility evaluation of the proposed BMP facilities should appropriately address the depth to groundwater and settlement/hydro collapse concerns of underlying soils. We will prepare and submit the Draft and Final Gectechnica| Investigation Report, as well as the electronic version to the City.
^ GEOTECHN|CAL INVESTIGATION: 8KF Engineers subconsuhant DiazYhurman &Assmciates, will provide, based on literature review, field explorations, laboratory testing, engineering analyses, and constnuctabi|ity reviews. The field exploration type, equipment, location, depth, and sampling pattern will be carefully selected so that required data is collected in an efficient manner. VVewill develop design solutions that are innovative yet practical and readily constructible, considering site constraints, design requirements, existing subsurface conditions, and long-term performance,
� HYD0OLC]GY/HYDRAUL|CS/DRA|NAG E |MPROYEMEWTG� Based on the needs of project, our Team will initiate the drainage design consistent with the concept design by performing a hydrology study of the drainage areas tributary to the project area. The hydrology study will typically consist of Rational Method analysis performed with software developed by Advanced Engineering Software (4ES). The software was designed to accept watershed data and perform Rational Method analyses in accordance with the Orange County Department nfPublic Works Hydrology Manual. The hydrology study will determine 10- and 25-year peak discharges atlocations critical toflood water management.

Projects will beevaluated with respect tocurrent water quality requirements asdefined bvthe [ountvsNational Pollutant Discharge Elimination System (NPDE5) Permit as issued by the Los Angeles Regional Water Quality Control Board. Once the requirements are established, preliminary plans for the implementation of storm water quality Best Management Practices (BMPs) will be developed in parallel with the design of the flood control elements of the Project. This parallel approach will result in an integrated water quality and flood control plan, n DRAFT CONCEPT PLANS: BKF will prepare the Draft Concept Plans that includes the chdco| elements of the project. These conceptual plans will depict the various design alternatives and aesthetic options the City will select from to progress to the Final Design, With the budget permitting, a SID visualization in support of public presentations and council meetings may be developed. Photosimu|ations (a technique in which proposed conditions are superimposed on photographs) shall be used to convey the various alternatives to City Council and project stakeho|ders.

We will capture ground and aerial photography, which the City will be able to provide input on the preferred ground and aerial perspective for use in the photosimulations. The exhibits shall include:
" Existing and proposed view from anaerial perspective
" Existing and proposed view from aground perspective
* I N ITIAL STU DY, BKF Subconsultant, LEA, will prepare an Initial Study briefly summarizing the proposed project, the existing project aetting,andpotentia|p jectimpectsre|atedtoeachoftheenvironmenta|resourcetopics contained in the Environmental Information Form, which is provided as Appendix G of the CEQA Guidelines.

The purpose of this Initial Study will be toprovide the City with express findings related to each of these thresholds, thereby providing the City with the information needed to decide whether a Categorical Exemption is applicable to the proposed project Otherwise if the Initial Study determines the Project may have significant impacts requiring mitigation then the Initial Study will serve as the basis for an |5/WN0.

City ufDowney | RFQ No. 23-002 9��
On -Call ProfessionalCm| Engineering Services 19 �0�|

STATEMENT OF QUALIFICATIONS

FINAL ENIGNEERING
VVewill advance the preliminary concept plans tothe final design level that have been reviewed and selected h»the City.

PREPARjTlON OF PLANS, SPECRCAT|ONS,AND ESTIMATES
Building on the Preliminary Engineering efforts, the Team will develop, as necessary, the following Construction Documents.

COST ESTUMATES
The BKF teem will develop a line item cost estimate matching the measurement and payment clauses in the specifications that will be used as the baseline estimate for the project throughout the design and into construction. Detailed construction cost estimates and quantity calculations will be submitted as part of each milestone PS8{Esubmittal packages.

SPEC|RCAT|ONS
We will prepare the specifications for all work items necessary for the construction of the Project.BKFwiUassemb|e data and assemble the appropriate Special Provisions consistent with County, State, Federal, and funding regulations.

City ufDowney | RFQ No. 23-002 ���|

STATEMENT OF QUALIFICATIONS

CLASSIFICATION

PROJECT MANAGEMENT
Principal
Senior Associate Principal
Associate Principal
Senior Project Manager | Senior Technical Manager
Project Manager I Technical Manager
Engineering Manager | Surveying Manager | Planning Manager

TECHNICAL STAFF
Senior Project Engineer | Senior Project Surveyor | Senior Project Planner Project Engineer | Project Surveyor|Project Planner
Design Engineer | Staff Surveyor | Staff Planner
0K8 Specialist |, U, U|
Technician |, U, UL |V
Drafter L U, U|, K/
Engineering Assistant | Surveying Assistant | Planning Assistant $315,00
$2B{00
$284,00
$27600
$270.00
$249.00
$232,00
$203.00
$177.00
$177D0 $20I00 $232,00
$168.00 $179D0 $197DO $212,00
$132.00 $145.00 $156.00 $174.00

FIELD SURVEYING
Survey Party Chief
$232.00
Instrument Person
$199D0
Sun/eyChainpersnn
$149,00
Utility Locator |' ||, |||, |V
$120D0 $170DO $204.00 $233.00

CONSTRUCTION ADMINISTRATION
Senior Consultant
Senior Construction Administrator
Resident Engineer
Field Engineer |, U, U|

FUNDING & GRANT MANAGEMENT
Director mfFunding Strategies
Funding Strategies Manager

PROJECT ADMINISTRATION
Project Coordinator
Senior Project Assistant
Project Assistant
Clerical | Administrative Assistant
Expert witness rates are available upon request.

Subject to the terms of a services agreement:
$30100
$263.0]
$19&OO
$177.00 $20100 $292�00
$216,00
$198.00
0 ~ Charges for outside services, equipment materials, and facilities not furnished directly by 8KF Engineers will be billed as reimbursable expenses atcost plus 10%, Such charges may include, but shall not be limited to: printing and reproduction services; shipping' delivery, and courier charges,- yubconsu|tentfees and expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable materials. ~ Allowable mileage will becharged atthe prevailing IRS rate per mile. ~ Monthly invoices are due within 3Odays from invoice date. Interest will be charged at 1.5% per month on past due accounts.

City ufDowney | RFQ No 23-002
On -Call Professional Civil Engineering Services 21 m00W

C iry of Do N -
LSA
01-CA, ENGINL E xi N� 5[ ,vi
Job Classification Hourly Rate','
Environmental/Technical Services
Principal
$315
Associate Planner/Scientist/Technical Specialist
$240
Senior Planner/Scientist/Technical Specialist
$200
Traffic Engineer
$180
Planner/Scientist/Technical Specialist
$160
Assistant Planner/Scientist/Technical Specialist
$135
Field Services
Senior Field Crew/Field Crew $115
Office Services
Senior GIS/Graphics
$185
Graphics/GIS
$155
Office Assistant
$125
Project Assistant
$125
Research Assistant/Intern
$go
Word Processor/Technical Editor
$140
' The hourly rate for work involving actual expenses in court (e.g., giving depositions or similar
expert testimony) will be billed at $400 per hour regardless ofjob classifications. z These rates are valid for the entire duration of the contract (June 30, 2026).

Description
Unit Cost
Description
Unit Cost
Reproduction (8.5 x 11) B/W
$0.07 per page
Total Station Surveying Instrument
$50.00 per day
Reproduction (8.5 x 11) Color
$0.40 per page
Level (Laser or Optical)
$25.00 per day
Reproduction (11 x 17) B/W
$0.10 per page
Laser Rangefinder
$25.00 per day
Reproduction (11 x 17) Color
$0.75 per page
Sound Meter
$75.00 per day
CD Production
$5.00 per CD
Sound Meter with Velocity Transducer
$85.00 per day
USB Flash Drive
$5.00 per drive
Aerial Photo
Cost
Plotting
$3.75 per sgft
Boat Rental
Cost
Aerial Drone
$200.00 per day
Water Quality Meter
$25.00 per day
Mileage On -Road
Current federal rate
Night Vision Goggles
$50.00 perunit per night
Mileage Off -Road
Current federal rate
Wildlife Camera
$25.00 per day
GPS Unit
$75.00 per day
Direct costs shall be reimbursed at cost plus 10 percent.

STATEMENT OF QUALIFICATIONS
A 7 • Y O} U RR. M A
DIAZ•YOURMAN & ASSOCIATES
Schedule of Charges — Valid 1/1/2024 through 12131/2026 Professional Services
Staff I ................................... ............................................ .............................................. .$169.00/hour Staffll............................................................................................................................... 193.00/hour
ProjectI.............................................................................................................................213.00/hour .. Project 11............................................................................ ..............................................233.00/hour Senior...............................................................................................................................257.00/hour AssociateI........................................................................................................................280.00/hour Associate11.......................................................................................................................301.00/hour Principal........... _._............................................_............................................. _...............335.00/hou r
Support Services
CADD/ Word Processing...................................................................................................121.00/hour Technical Editing...............................................................................................................147.00/hour TechnicianI.......................................................................................................................142.00/hour TechnicianII......................................................................................................................172.00/hour Prevailing Wage Field Services
Week Days (6 am to 5 pm)................................................................................................196.00/hour Weekday Overtime (first 4 hours) ............................................... ....................................... 233.00/hour Week Nights (5 pm to 6 am), Saturdays (0 to 12 hours).....................................................233.00/hour Sundays, Holidays, Other Overtime...................................................................................270.00/hour Equipment
FieldTruck......................................................................................................................... 22.00/hour NuclearGauge ........... .................. .................. ............................................115.00/day Manometer............................... ____ ..................................... ____ ................................... 68.00/day SlopeInclinometer................................................................................................................75.00/day CoringMachine..................................................................................................................266.00/day Outside direct costs such as drillers, laboratory testing, geophysical surveys, traffic control, equipment rental, outside services, printing, and copying ................................................. Cost + 15 For non prevailing wage field services provided by a staff engineer during night time (7 pm to 7 am) a $160 surcharge/ per night and a minimum per visit charge of 4 hours will apply.

Contract personnel may be charged at the hourly rates listed above. Travel time will be charged at regular hourly rates.

Diaz•Yourman & Associates makes no warranty, either express or implied, to its statements, conclusions, findings, recommendations or specifications except that they are prepared and presented in accordance with generally accepted standard of care.

City of Downey I RFQ No. 23-002 u
On -Call Professional Civil Engineering Services 22 tt, O

s MEN=
Principal
$239
Senior Project Manager
$207
Project Manager
$196
Deputy Project Manager
$149
Landscape Architect
$170
Civil Engineer
$196
Irrigation Designer
$170
Project Associate
$133
Senior Project Accountant
$159
Project Administrative Support
$101
3/8/2023

STATEMENT OF QUALIFICATIONS
W. G. ZIMMERMAN ENGINEERING, INC.

Billing Rate Schedule
City of Downey
January 1, 2024 through June 30, 2026
Classification
Rate
Principal
$ 230.00/Hr
Registered Traffic Engineer
$ 220.00/Hr
Senior Project Manager (Registered)
$ 210.00/Hr
Project Manager (Registered)
$ 190.00/Hr
Senior Project Engineer (Registered)
$ 185.00/Hr
Project Engineer
$ 170.00/Hr
Senior Associate Engineer
$ 150.00/Hr
Senior Design Engineer
$ 140.00/Hr
Design Engineer
$ 135.00/Hr
CADD Manager/Senior Designer
$ 140.00/Hr
Microstation CADD/Technician
$ 135.00/Hr
Administration/Office Support
$ 90.00/Hr
Non -labor Expenses
Mileage (local)
Federal Rate* per Mile
Printing
Cost plus 5%
Reproduction (Blue lines)
Cost plus 5%
Other Expenses (such as sub -consultants,
Cost plus 5%
outside services or special equipment needs)
*The above rates will be held for the d,retion of the contract. ®7812 Edinger Avenue'Suite 302 Huntington Beach, CA 92647 T� 714-799-1700 1 F. 714-333 4712 I www.wgze.com
City of Downey I l No. 23-002
On -Call Professional Civil Engineering Services
23 A

P S E P CONTRACTOR/ SUBCONTRACTOR ROSTER
Contractor / Sabcontracaor Name: Aeroi Mapping Inc.

SECTION I - LABOR PRICING SHALL REMAIN FIRM FOR THE ENTIRE TERM OF THE AGREEMENT e
��1�➢�V�UVI�II��II�VIUJ!I!!!!�i�llllllP,!!VI!!
�I i i I Ii ii i
®a
'11111101111
00 mo'
mo••
SECTION 11 - OWNED EQUIPMENT
©0C..ea

SECTION III - REIMBURSABLE EXPENSES
Are there any other expenses, not listed above, which Contractor / Subcontractor is seeking reimbursement for? _ NO
YES Ifchecked. explain:

Contractor Approval Company Approval Supply Management Approve

STATEMENT OF QUALIFICATIONS
O
O
0 00
lp
in
O
O
0 O
,
+n
O
O
0 N
01 {n
O
O
0 to
to
•-1
+n
a,
o
�
v
0 a
Of
0 o
0 r,
O1
0 o
0 to
tf1
c-1
0 O
0 to
a0
c-I
0 o
O
M
r,
0 0
0 to
M
c-I
0 0
O
11 V1
a-i
0 0
0 M
rH
0 0
to
-
to
0 o
0 cH
CT
v
o
d
v
0-
a
0 O
0 Gin'rN
N
0 O
0 "I
0 O
0 N
0 O
O
'7
`7
an
0 O
0 O
Ln
v>-
0 O
N
r
N
an
0 O
Vt
M
N
—
O
O
M
Ol
an
O
O
Lin
0)
N
—
O
O
O
CD
or)
•-1
an
O.

O
v
Do
c
u
u
na
Q
G
E
Q
V
-O
O
Q
G
m
v=
-
o
G
ri
Q
�
v
u
�
v
O
n0
>
'O
G
>
G
m
u
u
_
v
v
—
Y
o
u
u
is
m
o
o
>
O
O
E
G
N
v�
O
of
o
G
GO
G
u
N
ty
O-
m
2 w
3 N
ICE.
v
U
C1
E
o
s
O
Go.
p
N
Q
_
v
>
O
-c
ion
a
a
CL
a
°-
tEa
`t
G
c
°/
G
-O
u
C
ra
"
Q
O
2 a
Ln
v01bo
i
2 a
G
O
>
O
C
C
in
fl.

O.

D.
-Q
o
v
u
i!
O
Q
N
N
N
to
Lr1
N
'O
G
C
u
N
O
x
-
a�
ss+
u
O
X
w
a)
'O
V
-O
N
"O
O-
N
bA
G
—
iV
bGD
C
G
U
G
-6
in
O
�/1
p
f6
>
?
t6
in
G
w
—
F_
N-
-O
o
O
O
N
X
O
•-I
N
N
V
-6
C
-6
--
3 2
CGa
3 CL
f6
N
ra
N
V
i
O
in
O
is
G
O
j(
O
C
C
O
G
GO
G
c-I
co
to
w
2 ca
ra
U
VI
—
ra
a
p
x
x
x
x
O
O
Y
y
i
o
0 0
0 0
6 G>—
-
o--
o
v—
O
w
X
X
X
X
cccccc2
2 0
x
y
c
O)
a!
is
`•
•-I
H
N
o
o
o
o
0 o
ta0
UD
U
w
L—
u
,�,,
u
E
E
O
U
a)
aJ
a)
a!
U
U
U
U
U
U
G
G
Q!
E
m
a!
h
i-
of
O
L
O
L
O
L
O
L
:�
..u--
w
w
w
L
U
L
>
>
E
E
O
O
O
O
O
m
O
O
,
O
>'
a1
to
o
O
O-
O
O
-O
a1
O
in
0_
Ft
2 a
a
Y
>
2 Q
V1
0_
E—
I—
Q
o-
o-
City of Downey I RFQ No. 23-002
On -Call Professional Civil Engineering Services 24 AM

STATEMENT OF QUALIFICATIONS
2~TEAM PROCESSES AND RESOURCES

PROJECT CONTROLS
BKFsproject con1rn|sprocesahe|psessistourteaminprodudngandde|ivehngqua|hvdocument that meet the project delivery, cost and quality objectives. BKF will keep the City ofDowney informed and will work to exceed expectations and maintain the project onschedu|e

PROJECT MANAGEMENT
PROJECT KICKOFF MEETING/PUBLIC OUTREACH/PDT MEET|NGS-1 BKFwill develop the agenda, invite project team members and stakeholders and administer project kick-off meeting, This meeting will confirm project scope, deliverables, schedule, communication conduits, invoicing, and establish future Project Development Team (PDT) meetings. BKF will prepare meeting minutes and distribute toall in attendance for review and concurrence. Our team will attend Project Development Meetings, Public Outreach, and City Council Meetings tosupport City Staff and the convey the Project goals,
MASTER PROJECT SCHEDULE/PROGRESS REPORTS-, Upon receipt of Notice to Proceed (NTP)from the City, we will develop and deliver Project Master Schedule in Microsoft Project to the City within 10 days. The schedule will be updated and distributed during PDT meetings to confirm the Project is tracking according to expectations. BKF will prepare progress reports indicating current tasks, outstanding action items, schedule monitoring, and future anticipated meetings. The progress reports will be prepared and submitted monthly to the City Project k4anagerpriortothe 15thofevery month for the duration ofthe project.

MONTHLY INVO10NG: BKF will collect, review and compile invoices from the design team on a monthly basis and will provide the City with the teams composite invoice. Invoices will delineate the current percent complete by task which along with the project schedule can be used to confirm effort, payment, and deliverables are in alignment.

DELIVERY CONTROL
DEFINED SCHEDULE: A Microsoft Project schedule will be based on the work plan jointly developed by the City and BKF. At each phase, BKF will update the schedule which will incorporate time for the City to review the documents. Any deviations inthe schedule will bediscussed promptly with the City.

OUTSTANDING ISSUES MATRIX: BKF will track all outstanding design and program issues in a matrix to facilitate discussions with the City and internal team. This matrix tracks design issues, costs and the schedule.

SCHEDULE RECOVERY.- If delay in the schedule is encountered, either by the stakeholders or by the design team, BKF will develop comprehensive revised schedule to bring the project back in compliance with the project delivery date. BKF will develop this plan, gain commitment from sub -consultants and present and gain agreement from the City, The plan will include staffing augmentations, possible concurrent activities, and a monitoring mechanism toensure the schedule recovery remains ontrack. BKF has more than 47O+ employees that are experienced inall aspects ofmunicipal projects, vvhicheUowsuatobringthestafMnghorsepowertothe project to avoid slippage in schedules and maintain the City's delivery date.

COST CONTROL
PROGRESS REPORTS: Our Project Managervi||provideprogressnaportstotheChxtudemonstrmtetheteam istracking with the project schedule. Theme reports will be comprehensive in nature to keep all design team members, City, and project Gtakeho|densappnaisedofthestetusofvarioustasks,anyschedu|e C{}NGTRUCT|ON C(JS-[ BKF integrates cost estimates for each milestone delivery and compares to the baseline costs established early on in the project. During the initial tasks the BKF Team will refine the intent of the Concept Plan and develop a conceptual construction estimate in alignment with current construction costs due to inflation, EKE understands there are finite budgets associated with these capital improvement projects and will track and tailor the design accordingly,
City ufDowney |RPQNo. 23-002
On -Call Professional Civil Engineering Services 25 mtom

STATEMENT OF []UA||F|(-AT|(lNS
QUALITY ASSURANCE /QUALITYC[]NTR[}L
QUALITY ASSURANCE PROGRAM: BKF will utilize Jason Kirchmenn, PE, PLS as our dedicated Qua|hxAssurance/ Quality Control Manager. Jason's key role is to assure the Quality Control procedures delineated below are closely followed and the procedure documented,
LEVEL1: INTERNAL REVIEW EACH DISCIPLINE IS REQUIRED0 CONDUCT AN INTERNAL REVIEW PERFORMED

PRIOR TO EACH MILESTONE SUBMITTAL,
A senior staff member at the firm, other than on the design team, shall review the documents prepared by the design team. This review will require that all items on the documents be highlighted in yellow indicating the review has occurred and there are no exceptions to the document, This process is for the entire document (i.e. north arrows, station call -outs, profile grid designation, etc).
� If the reviewer identifies an item on the document that is not correct, then it is marked in red, If the reviewer has comments for clarifications, then itismarked ingreen, ° After the review is complete, the document is returned to the design team with a signature (documentation) indicating the review iscomplete,
� The design team will review and address all items in red and meet with the reviewer on the items in green until a clarification allows for the reviewer to yellow the item, or a red mark is added, � The design team will then resolve the red marks and return the reviewers original markup along with a clean print, The reviewer will document the comments that have been addressed by yellowing out the original red mark and placing yellow on the clean set, and signing the document. ° All disciplines provide their plans to BIKE for collation, @KFwiU assemble the sets and distribute to the design team.
= Each discipline will review the others and similar to the process delineated in Level 1 above marking in yellow, red, orgreen, and return to8KFfor collation.
= A meeting will be held with all the disciplines in attendance, and the documents with all red or green comments will be discussed and resolved between disciplines, ° The resolutions will be marked in red and returned to the designer for incorporation as described above in the Level procedure.

Im
M
City ofDowney |RFQNo. 23-002
On -Call Professional Civi|Engineering5ervices 26 .0da

STATEMENT OF QUALIFICATIONS
® SUPPLEMENTAL INFORMATION
A6R _ DATE (MMIDDlYYYY) CERTIFICATE OF LIABILITY INSURANCE 8/3/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER CONTACT
NAME: Nancy Ferrick
AssuredPartners Design Professionals Insurance Services, LLC PHONE FAX 3697 Mt. Diablo Blvd., Suite 230 A/c No Ext: 510-272-1400 A/C No:

Lafayette CA 94549 ADDRESS: [email protected]

INSURED
BKF Engineers
2100 Franklin Street, Suite 4C
Oakland CA 94612
INSURER A: Continental Insurance Comoanv 1 35289
I INSURERC: Vallev Foroe Insurance Comganv 1 20508 1
Insurance ComDanv 1 20494
COVERAGES CERTIFICATE NUMBER 71,1,742RRR REVISION NUMBER

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR ADDL SUBR POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE p y,ND POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS C
X

COMMERCIAL GENERAL LIABILITY Y
Y 7034315572 9/1/2022
9/1/2023

EACH OCCURRENCE
$1,000,000

CLAIMS -MADE X OCCUR

DAMAGE TO RENTED
PREMISES (Ea occurrence)
$ 1,000,000
X
Cross Liability
MED EXP (Any one person)
$ 15,000
x,c,u
PERSONAL d ADV INJURY
$ 1,000,000
X
AGGREGATE LIMIT APPLIES PER:

GENERAL AGGREGATE
$ 2,000,000
GEN'L
POLICY I^ ECT LOC

PRODUCTS - COMP/OP AGO
$2,000,000
1 $
OTHER:

E

AUTOMOBILE LIABILITY Y
Y 7034315569 9/1/2022
9/1/2023

COMBINED SINGLE LIMIT
Ea accident
$ 1,000,000
BODILY INJURY (Per person)
$

X ANY AUTO

OWNED SCHEDULED

AUTOS ONLY AUTOS
BODILY INJURY (Per accident)
$

PROPERTY DAMAGE
Per accident
$

HIRED NON -OWNED

AUTOS ONLY AUTOS ONLY
A
X

UMBRELLA LIAB X

OCCUR Y
Y 7034315619 9/1/2022
9/1/2023

EACH OCCURRENCE
$ 5,000,000

AGGREGATE
$ 5,000,000

EXCESS LIAB

CLAIMS -MADE
DED RETENTION $
$
D

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY Y / N

ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED? N N/A
Y 72WEOK8HOZ 9/1/2022
9/1/2023

X I PER OTH-

STATUTE ER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
B
Professional Liability
1 DPR5001534 9/1/2022
9/1/2023
Per Claim
$5,000,000
Includes Pollution Liability
I
Annual Aggregate
$7,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Umbrella/Excess Liability policy is follow -form to underlying General Liability/Auto Liability/Employer's Liability.

FOR PROPOSAL PURPOSES. AN ACTUAL CERTIFICATE WILL BE ISSUED AT THE REQUEST OF THE NAMED INSURED.

CFRTIFICATF HOI_DFR CANCFI I ATION 30 Oav Nntica of CAnCAIlAtlnn

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
-**SAMPLE****

AUTHORIZED REPRESENTATIVE
IJ 19U8-ZU15 AC:UKU GUKPUKAIION. All rights reserved.

ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD City of Downey ( RFC No. 23-002 p
On -Call Professional Civil Engineering Services 27 4 -

STATEMENT OF []UA||F|(-AT|(lNS

LITIGATION HISTORY
BKF Engineers has over 108years ofbeing financially conservative and is in excellent financial condition. VVestrive to control risk through education and being prudent in providing our professional services. We thoroughly evaluate each and every assignment and assess potential risk factors that could be present. As a consequence of engaging in any business, there is always the potential for assertions of fault or claims which may or may not give rise to litigation, mediation, or arbitration.

K4ontecho Vista Project
Villa Developers & Investment vs. Taylor Morrison et al BKF and others have been sued by a private developer who lost a commercial property in foreclosure and is now blaming that on various entities who designed the fire sprinkler system for the project
Pending
2018
Central Park South Apartments, San Mateo
Central Park LLCvs. SandisCivil Engineers
Construction staking issue related to inaccurate client provided improvement drawings causing delays and grading rework
Settled 2021 through mediation
As a component of our prudent risk management practices, we do carry a high -quality professional liability insurance to provide financial coverage for any assertions of fault or claim related to the professional services we provide
City ufDowney | RFQ No. I3-002
On -Call Professional Civil Engineering Services 28 m0W

m
mm

�S
{ H IS
"PIP
u

":4*1W&WK91il,I6�»%AIilktPWH I•i1
October 13, 2023
City of Downey
ATTN: Mr. Matthew Baumgardner
Director of Public Works/ City Engineer
11111 Brookshire Avenue
Downey, CA 90241
RE: Proposal to Provide On -Call Civil Engineering Services, RFQ No. 23-002 Dear Mr. Baumgardner,
The Kreuzer Consulting Group (KCG) appreciates the opportunity to present our qualifications for the subject on -call contract. Our firm is uniquely qualified for this assignment for two reasons. One, we are completely committed to the public works sector. We are a small company led by seasoned individuals that are completely devoted to providing quality planning and design services to Southern California municipalities; Two, we have significant experience serving as on -call consultants to Southern California municipalities. Currently, we have active on -call engineering with the following agencies: Anaheim Public Works, Anaheim Development Services, Lake Forest, Irvine, Tustin, Gardena, Newport Beach, San Juan Capistrano, San Clemente, Brea, Signal Hill and Culver City. We have also completed numerous design projects for the City of Downey over the last 7 years. We have formatted this qualifications to address all of the items outlined in the RFQ. We take no exceptions to the sample contract provided with the RFQ and can meet all insurance requirements outlined therein.

As the President and CEO of the firm, I am authorized to sign on behalf of the company. Thank you for the opportunity to submit these qualifications. If you have questions or require additional information, please do not hesitate to call.

Respectfully Submitted,
f+6_&I000I1W
Rick Kreuzer, P.E.

President
18872 MacArthur Blvd - Suite 210 - Irvine, CA - 92612 - 714-656-0160

Page No
Section 1.0 Company Profile ....................................... 1 Section 2.0 Overview and Approach .......................... 3 Section 3.0 Project Team ........................................... 7 Section 4.0 Relevant Experience................................18 Section 5.0 References and Testimonials ..................23 Section 6.0 Fee Schedule..........................................24 Section 7.0 Contractual Compliance .........................25

BACKGROUND: The Kreuzer Consulting Group (KCG) is a California corporation. We were formed July 1, 2004 by our president and founder, Rick Kreuzer. Mr. Kreuzer has spent his entire 40 year professional career as a civil engineering design consultant serving the public sector. We are based in Irvine, California and maintain a staff size of 12.

SERVICES: Municipalities, counties, and public agencies as a whole, face diverse challenges when planning and implementing improvements to public infrastructure. Public planning issues, environmental constraints, and the concerns of local residents all have the potential to impact a project's bottom line.

KCG has created a network of resources, both in-house and through long-standing relationships with quality subconsultants, to provide clients with "one -stop shopping" in all of the technical disciplines necessary to address these issues. Services provided by the KCG team include:

KCG staff have worked extremely hard over the years to establish the firm's reputation as engineers who will "go the extra mile" for our clients. We are proud of this reputation.

RELEVANT EXPERIENCE: A big part of our firms practice includes the provision of design services through on -call engineering contracts. The following summarizes our current on -call design services contracts:
❖ City of Anaheim — Public Works Department
❖ City of Anaheim — Development Services
❖ City of Anaheim — Construction Services
❖ City of Gardena
❖ City of Culver City
❖ City of San Clemente
❖ City of Tustin
❖ City of Brea
❖ City of San Juan Capistrano
❖ City of Newport Beach
❖ City of Lake Forest
❖ City of Laguna Beach
❖ City of Signal Hill
We are familiar with the nature of on -call contracts. We are flexible, and through the team proposed herein, will provide a design team that is customized and has the resource capabilities to handle any project assignment put before us.

We have also completed, or have design in progress, for many City of Downey projects, summarized as follows:
➢ FY 20-21 Residential Street Improvements
➢ FY 19-20 Residential Street Improvements
➢ Imperial/Paramount Intersection Improvements
➢ Alleys North and South of Stewart and Gray Road
➢ Alleys North of Foster Road Improvements
➢ Manzamar Avenue Street improvements
➢ Bergman Lane Street Improvements
Section 4.0 herein provides a more detailed description of KCG's relevant project experience.

K

The Kreuzer Consulting Group (KCG) is a firm comprised of individuals who have spent their entire professional careers serving the public sector in Southern California.

We are led by our President, Rick Kreuzer, who has 40 years of experience in the Public Works engineering industry. Our firm is a small firm (12 staff) which can provide a broad range of services to our clients. We currently have active on -call engineering contracts with multiple departments in the City of Anaheim, as well as with the Cities of Long Beach, Tustin, Brea, San Juan Capistrano, San Clemente, Arcadia, Lake Forest, Newport Beach, Gardena and Culver City.

We also maintain strong relationships with subconsulting support firms that share our philosophy of hands-on principal involvement on all projects. Depending on a particular project's needs, this team would consist of some, or all, of the following firms:
• Clark & Green — Landscape Architecture
• Hartzog & Crabill — Traffic Engineering
KCG has worked extensively with these firms on past projects with great success.

Our in-house staff are second to none. Their credentials as well as a detailed description of the wide range of projects we have delivered over the years are summarized in sections 1.0 and 2.0 of this proposal.

Our experience will translate to value for the City of Downey. Based upon our firm's extensive public works design experience, we believe the key issues for successful completion of on -call design projects center around the key areas summarized on the following pages. ❖ Effective Project Management
There is no doubt that all proposing firms will tout their abilities to effectively "manage" a project.

Unfortunately, many firms believe if they stay somewhat on schedule and submit their invoices on time they have been "effective" managers. We at KCG do not subscribe to this. Our core business philosophy is centered around effective management of all of our projects with the goal of making our clients job easier. The cornerstone goal of this philosophy is to "get out and stay out in front of the issues" on each and every project. We feel very strongly that our clients hire us for an assignment it is our obligation to bring it to a successful completion without having our hands held or being reliant on City staff to do our job for us. We know that cities have this hand -holding experience with consultants too frequently... KCG will not allow this to take place on this or any project. The way we achieve this objective is by providing seasoned engineersthat are also effective managers, not only because they understand the project process but because they understand the technical background of the design itself. We can anticipate issues faster than those managers who are reliant on younger design engineers to keep them informed. This disconnect cannot and will not happen at KCG because our Project Managers have hands on day to day involvement in the project design. Our project manager for the subject project will be Rick Kreuzer. Mr. Kreuzer is the President of KCG and has 40 years of experience managing and designing public works projects. Over the last 15 years, he has personally managed and/or designed over 50 roadway and public works infrastructure improvement projects for Southern California cities. 3 ❖ Proactive Utility Coordination
Utility coordination is an element that, if not properly addressed and managed, can significantly effect a project schedule and budget. This work task is much more than gathering record drawings and plotting then on the plans. The success of this task is proactively managing the relationship with all utility agencies involved. It certainly requires the establishment of the existing location of utilities as a first step but the real key is identifying the impacts to these facilities early on in the design process and coordinating proactively with the affected agency staff/service planners to mitigate those impacts and facilitate needed relocations.

Overlooking or addressing utility impacts late in the design process usually results in schedule overruns and cost increases during construction.
❖ NPDES Expertise
Water quality requirements have become a critical component of projects over the last decade. Successful delivery of a project requires a firm that understands this reality and can deliver the permits required.

KCG's stormwater specialist, Chris Becker, has a thorough understanding of the City's plans for long-term pavement maintenance and rehabilitation, while maintaining strict compliance with today's stringent water quality regulatory environment. He is a seasoned stormwater compliance expert that specializes in the municipal sector. He is a California Certified/Qualified SWPPP Practitioner (QSP) and Qualified SWPPP Developer (QSD). KCG can turn -key all storm water compliance needs from site assessment, to report preparation, to site inspections and monitoring. We have a working knowledge of the complex California General Stormwater Permit for New Construction and are currently performing work for many cities, Caltrans and several developers and general contractors. ❖ Grant Funding Knowledge
We are very familiar with the various local grant programs administered by LAMTA and Caltrans, having completed multiple projects with funding allocations from these agencies. ❖ Focus and Experience
KCG's primary core business is civil design. Our staff has delivered successful street widening and rehabilitation and utility projects all around Southern California for the last two decades. We understand the design subtleties associated with public works design projects in urban settings. Moreover, we provide in house experience in the complementary functions, namely water quality and community outreach, that have become so integral to the successful delivery of projects in today's world. This experience and focus will translate to value, via cost effective design, to the City of Downey. ❖ On -Cali Experience
The nature of on -call contracts requires a firm to be nimble and responsive. We are a small firm that prides ourselves on providing these qualities to our clients. This is evidenced by the number of active on -call contracts we maintain with other public agencies.
❖ Project Quality and Delivery
Simply put, the ultimate success of a project is determined by the delivery of a quality design delivered on schedule. The following pages describe the tools and approaches KCG implements to insure that these objectives are achieved on all of our projects.
4 Once a project is identified, the KCG Project Manager will meet with the City Project Manager or designated staff member responsible for the project to discuss the proposed scope of work, projected schedule, and estimated costs required to complete the detailed work. The KCG Team will not begin work on a project until a work order has been approved. Upon concurrence of all work order details, the City will issue the work order, and the KCG Team will begin the designated tasks.

The KCG Team, together with its supporting subconsultants, will provide the City with the resources necessary to successfully deliver the projects at hand. The following are the project controls we employ to deliver each project assignment.
❖ Schedule Control: KCG has extensive experience in managing projects through such automated scheduling tools such as Microsoft Project and Primavera. The KCG Project Manager will coordinate with the City Project Manager to determine the most appropriate scheduling software for this project.

A monthly status of each project schedule will be provided and impacts to other project tasks will be noted if there are delays. Any delays or schedule modifications will be discussed with the City Project Manager and recommendations will be given for maintaining the overall schedule. ❖ Cost Control: KCG is committed to controlling costs through regular and timely discussions of work efforts and project accomplishments. KCG will utilize automated project accounting tools to ensure project completion within budget. Before the start of the project, a detailed scope of work will be established where tasks and subtasks are identified and a "per -task" budget will be estimated. Project team members will develop a scope of work that minimizes project cost, while ensuring a high -quality product. The KCG Team Project Manager will discuss with the City Project Manager key elements of the project budget and work scope before the project begins. In this way, unforeseen costs and potential delays will be minimized.

Time spent on projects is recorded electronically on an integrated time sheet application for each work day and integrated into an automated tracking system. From the computerized system, the Project Manager can, at any time, obtain a detailed Project Progress Report that shows the amount of time spent per person, as well as the budget -per -task, year-to-date, and project -to -date. Expense sheets for professional services and expenses (from direct costs such as equipment, materials, and subcontractor services) are prepared weekly. These tools allow KCG to proactively manage the project delivery process and identify potential schedule and budget issues before they become a problem. We can also provide the City with a Work Breakdown Schedule (WBS) for both manhours and costs which assists us with managing the flow of work and provides the City of Downey with anticipated monthly project cash flows for the entire project duration.

At KCG, we believe our "uniqueness" comes from our belief that quality control is rooted in the philosophy by which you conduct your business. It is true that quality can be monitored and controlled to some degree via checklists and independent reviews, but a true "quality" product comes from a firm's commitment to excel for their clients. Do they care about their product? KCG does. Do they have experienced staff overseeing or doing the work every step of the way? KCG will. Do they want the next job? KCG does. Are they staying out in front of the issues and "leading" the project? KCG will. Qualty is a culture within a company ... you either have it or you don't.

This philosophy manifests itself in how we systematically approach QA/QC. This is a cornerstone element of KCG's overall approach to the management and control of our work. The graphic below depicts KCG's approach to QA/QC on all of our projects.

Strong and Effective Management by the Project
Manager
Serve as the primary contact with Client and other
agencies.

Manage the consultant team. Enforce effective
communication.

Control the flows of communication.

Exercise decision -making authority for the entire team..

Meet and thoroughly fulfill all contractual and
technicallprofessional requirements. Be responsible for product quality and timely delivery.

Attend andlor chair all progress meetings.

Be proactive.

Encourage thinking outside the box.

Project Control
Initiate project control system.
- Constantly monitor the overall project schedule as well as specific schedules of principal and critical activities.

Constantly monitor internal labor and direct costs.

Monitor subconsultant costs.

Alert Client of potential impacts to cost and/or schedule and propose solutions.

Furnish invoices in a timely manner to Client. Monitor
subconsultant invoices.

Monitor project record keeping (project files, meeting
minutes, etc.)..

Progress Staters Monitoring
r Conduct Progress Meetings with Client and other external agencies at specified times as needed.
r Conduct team meetings:.

Prepare monthly progress reports
' Status summary exhibits on cost and schedule
Discussions on past/schedule activities
Status of meetings and action items
• Prepare meeting minutes and promptly distribute to all parties. Include:

List of attendees
Purpose and objectives of the meeting
Summary of the discussions
Decisions reached
Action items and the respective responsible entitylindividual Quality Assurance/ Quality Control
Documents will be comprehensively checked at one or more milestones before they are completed.

A senior person not associated with the project will check all documents before they are submitted.

One person will check all critical dimensions.
r The person responsible for the drawings will review the text, and the writer will review the drawings, insuring adequate cross checking.

The Project Manager will review all documents produced by other contributors to insure overall project coordination.
= Apply TOM principles - DO IT RIGHT THE FIRST TIME.

Conduct Independent Reviews, as warranted.

At KCG, we pride ourselves on the quality of our work product. We encourage the City of Downey to contact our past and current clients regarding this claim.

Our team organization is depicted on Exhibit A below. KCG's president, Rick Kreuzer, PE, will be the Project Manager as well as the Principal in Charge. He will be the single point of contact with the City of Arcadia, and will have the authority to act on behalf of the firm regarding all contractual, project performance and quality matters.

Mr. Kreuzer is a registered civil engineer in the State of California with 40 years of professional experience.

The unique aspect of Mr. Kreuzer's experience is that he has spent his entire professional career as an owner of (or working for) small firms which means he has been, and continues to be, a very involved and hands-on Project Manager. He is not a delegator or glorified principal but is "on the boards" and intimately involved with the day to day design aspects of his projects. We believe this attribute is a real value to our clients and is the cornerstone operating philosophy of our company.

Assisting Mr. Kreuzer with the day to day design of the project will be Mr. David Jarvi. Mr. Jarvi has been Mr. Kreuzer's right hand man for the last decade including many assignments within the City of Downey.

He is a registered Civil Engineer with 24 years of experience. He is proficient with the use of AutoCAD software and has a thorough understanding of City standards, design criteria and plan formatting requirements. He is also well versed with Civil 3D design software.

Eric Metz, LS will be responsible for all surveying mapping and right of way acquisition documentation. He has 23 years of professional surveying experience and is an expert Civil 3D software user.

Chris Becker, QSP is KCG's Storm Water Quality expert. Mr. Becker has 29 years of professional experience in the public works industry. He is a Qualified SWPP Developer and Practitioner (QSD/QSP), Certified FA

Professional in Erosion and Sediment Control and Certified Sediment and Storm Water Quality Management Plans (WQMP), Storm Water Pollution Prevention Plans (SWPPP) and Caltrans Storm Water Data Reports (SDR).

The key KCG personnel identified for this on -call project will remain for the duration of the project and will not be removed or replaced without the prior written consent of the City of Downey. Resumes for each of these key team members are contained on pages 10 through 15 of these qualifications.

Subconsultants
KCG utilizes the same subconsultant firms on all of our projects. These firms share our philosophy of hands-on principal involvement on all projects. Depending on the needs of a particular project or assignment, KCG would utilize the services of some or all of the following subconsultants:

Mike Green, ASLA QCurrent
Clark & Green Associates Q Past
Landscape & Irrigation
Mr. Green has 43 years of experience. During his career, Mr. Green has worked with the City of Westminster Planning Department and the Port Authority for the City of Long Beach in Environmental Impact Research Preparation and Risk Management Assessment. In 1986, he and his partner, Bob Clark, formed Clark & Green Associates. Mr. Green has specialized in community residential projects and public streetscapes with an emphasis on water management, conservation and sustainable landscape design. He has received multiple ASLA awards for his design work over the years. Mr. Green has multiple roadway intersection improvement projects with KCG, including the Brookhurst Street and Orangewood Avenue Improvements in The City of Anaheim.

Scott Ma, PE, TE QCurrent
Hartzog & Crabill QPast
Traffic Design
Mr. Ma is a senior engineer with HCI who is currently providing contract City Traffic Engineer services to the City of Lake Forest, as well as on -call traffic engineering services to the City of Hermosa Beach. Mr. Ma is a licensed Civil and Traffic Engineer registered in the State of California and brings over (22) years of engineering experience. Mr. Ma's experience includes traffic signal design, reviewing and conducting a variety of traffic studies including but not limited to, warrant analyses, preparing and reviewing traffic impact analyses reports and recommendations, responding to community requests such as crosswalks, traffic signals, stop signs, parking matters, and also performing project management that includes ADA review and final preparation and design/submittal of project plans, specifications, and estimates (PS&E).

Resumes for these subconsultant key personnel are contained on sheets 16 and 17 of these qualifications.

Table 1 below provides a synopsis of the KCG team's key personnel registrations experience and project availability.

Our approach to delivering projects will be the one we have used with a multitude of cities for the past 25 years which consists of providing an experienced Project Manager who is "hands-on" with the day to day design elements of the project and who proactively manages a team of subconsultants who share the same commitment of providing seasoned firm principals to direct and manage their work. All of the subconsultants on our team have worked extensively with KCG on past projects. We know what to expect of each other and are fully committed to delivering quality work.

Personal resumes for these KCG team members are included on the following pages.

RICK KREUZER, P.E.

EDUCATION:

B.S. in Civil Engineering
University of California, Irvine,
1983
Certificate Program in
Construction Management,
American Sociaety of Civil
Engineers, 1987
AFFILIATION:

American Society of Civil
Engineers
Institute of Transportation
Engineers
REGISTRATION:

Registered Civil Engineer
(California & Arizona)

KREUZER CONSULTING GROUP
Mr. Kreuzer, the founder and President of KCG, has 40 years of experience managing complex transportation and civil projects. His strength is managing multi -disciplined teams on projects which require innovative solutions and hands-on principal involvement. He is the President of the Kreuzer Consulting Group (KCG).

PROJECT EXPERIENCE:

Project Manager for on -call contracts with the following agencies:
❖ City of Anaheim — Public Works Department
❖ City of Anaheim — Development Services Department
❖ City of Anaheim — Public Utilities Department
❖ City of Irvine
City of Tustin
❖ City of Lake Forest
City of Brea
City of Long Beach
❖ City of Newport Beach
❖ City of San Juan Capistrano
❖ City of Gardena
❖ City of Culver City
City of Downey Projects: Mr. Kreuzer has served or is currently serving as the Project Manager for the following Downey Projects:
➢ FY 20-21 Residential Street Improvements
➢ FY 19-20 Residential Street Improvements
➢ Imperial/ Paramount Intersection Improvements
➢ Alleys North and South of Stewart and Gray Road
➢ Alleys North of Foster Road Improvements
➢ Manzamar Avenue Street improvements
➢ Bergman Lane Street Improvements
Registered Civil Engineer
(Arizona) Disneyland Resort Area Improvements: Mr. Kreuzer has been involved with the transformation of the Disneyland Resort Area in the City of Anaheim for the last decade in various capacities. He was involved with the initial planning efforts which established the vision for the 800 acre Resort Area including significant outreach activities with local residents and business owners. From there, Mr. Kreuzer managed the Preliminary and Final Design efforts for the construction of the two main backbone arterial streets in the Resort District, namely Katella Avenue and Harbor Boulevard. These projects included significant streetscape and landscape enhancements to make the Resort Area a more attractive destination..

Katella Avenue Smart Street Phases 1 & 2: Project Manager of an alignment study and final design for the widening of three miles of Katella Avenue along the Disneyland and Anaheim Convention Center frontages. This included widening of four major intersections. Total construction value of Phases 1 and 2 was approximately $35 million. The project included the design of street, storm drain, sewer, water, landscape, streetscape and traffic signal improvements. In addition right of way acquisition documents in the formal of legal descriptions and plans were prepared by KCG staff for approximately 120 partial takes of existing parcels. This project also included coordination with Caltrans with regard to 1-5 improvements at the east end of the project. lug

Brookhurst Street Widening: KCG recently completed preliminary and final design services for the widening of Brookhurst Street between Katella Avenue and Ball Road in the City of Anaheim. This project will includes roadway, drainage, utility, landscaping, and traffic signal improvements.

Platinum Triangle Backbone Infrastructure Implementation Plan: The Platinum Triangle is located in the City of Anaheim at the confluence of the 1-5 and SR-57 freeways. The Platinum Triangle is approximately 820 acres in size. It is traversed by a major intercity/commuter railroad line and encompasses Angel Stadium of Anaheim, as well as the Arrowhead Pond of Anaheim.

The Platinum Triangle project will be a mixed -use development with a dynamic mix of uses including upscale, high density urban housing integrated by a carefully planned network of pedestrian walkways, streetscape improvements and recreation spaces.

For this project, Mr. Kreuzer managed the completion of the Platinum Triangle Implementation Plan for Backbone Public Works Facilities. This plan served to define the:
■ required arterial roadway, streetscape and landscape improvements ■ required sewer system improvements
■ required storm drain system improvements
■ required water system improvements
■ required electrical system improvements
■ right of way acquisition required to construct all backbone infrastructure improvements ■ breakdown of project segments for implementation
■ cost estimates for all project segments
■ schedule for implementation of the program
■ cash flow estimate for the implementation of the program This plan is currently being used as the basis for establishment of a $200 million Community Facilities District (CFD) to finance all required backbone infrastructure improvements needed to support development in the Platinum Triangle project area.

Katella Avenue Widening: Final PS&E for the first arterial improvement project in the Platinum Triangle project area.

This project consists of widening of Katella Avenue between Lewis Street and State College Boulevard to accommodate 4 lanes of traffic in each direction. New parkway and median landscaping will be constructed along with upgraded streetscape furnishings consisting of light poles, bus shelters, and traffic signs.

Brookhurst Street Widening: Final PS&E for the widening of Brookhurst Street from 1-5 to SR-91 in the City of Anaheim. This project includes widening the existing 4 lane roadway to 6 lanes as well as the construction of a new 54 inch mainline storm drain and extensive landscaping in the medians and parkways.

Imperial Highway Smart Street: Completed Project Report, Alignment Study and Implementation Plan for the widening of Imperial Highway from the Los Angeles County line to Rose Drive, a distance of 8.5 miles.

Arizona Avenue Streetscape Improvements: Planning and design for the downtown revitalization of Arizona Avenue in Chandler, Arizona.

Southern Avenue Phase 2 Streetscape Improvements, Mesa, Arizona: Mr. Kreuzer is the Project Manager for the final design of the 2nd phase of the Southern Avenue Improvements in the Fiesta District from Sycamore to the west City limit at the Tempe Canal. This project is a natural extension of the Phase 1 improvements that were recently constructed. This project includes street narrowing, landscape and streetscape improvements, drainage, lighting and traffic signal improvements. The project will also require the preparation of right of way acquisition documents and coordination with the City's real estate staff as well as the public and other stakeholders.

M

David Jarvi, PE
EDUCATION:

B.S., Civil Engineering,
California State University,
Chico
SOFTWARE SKILLS:

KREUZER CONSULTING GROUP
Mr. Jarvi has over 23 years of experience in General Civil and Transportation Engineering. He specializes in local roadway planning and design projects with experience in design engineering with a focus on civil and transportation projects.

His extensive knowledge of roadway layout, reconstruction, and rehabilitation are evident by a growing list of local agencies that seek his street improvement involvement (Los Alamitos, Cypress, Anaheim, Stanton, Long Beach, Downey, Costa Mesa, Industry, Yorba Linda, Newport Beach, Orange, Dana Point, Irvine, Mission Viejo, San Clemente, Lake Forest, San Juan Capistrano, and Laguna Niguel). Mr. Jarvi has been responsible for the preparation of street plans, cross sections and details for a wide range of roadways from single intersections to miles of large arterial highways.

PROJECT EXPERIENCE:

City of Downey Projects: Mr. Jarvi has served or is currently serving as the Project Engineer for the following Downey Projects:
➢ FY 20-21 Residential Street Improvements
➢ FY 19-20 Residential Street Improvements
AutoTURN, Microsoft Excel, ➢ Imperial/ Paramount Intersection Improvements Bentley Inroads, Microstation, ➢ Alleys North and South of Stewart and Gray Road Autodesk Civil3D ➢ Alleys North of Foster Road Improvements ➢ Manzamar Avenue Street improvements
REGISTRATION: ➢ Bergman Lane Street Improvements
Professional Engineer,
California, No. 66792 Atlantic Avenue / Pacific Coast Highway Intersection Improvements, City of Long Beach, Long Beach, CA — Project Engineer for the rehabilitation of over two miles of Atlantic Avenue in the City of Long Beach. Tetra Tech prepared the preliminary and final PS&E for roadway rehabilitation, right turn pocket widening, storm drain inlet upgrades and pipe reconstruction, utility relocations, traffic signal, traffic control, and parking lot improvements at the Atlantic Avenue and Pacific Coast Highway intersection in the City of Long Beach. Since the widening portion of the project impacted the adjacent high school parking lot, our Team effectively coordinated with the school district to complete the required work within the schedule. In addition, our work included obtaining an encroachment permit from Caltrans for construction within the state highway system.

Lakewood Boulevard Improvements Phase 3A, City of Downey, Downey, CA — Project Engineer for the design of streetscape and roadway improvements on Lakewood Boulevard in the City of Downey. Tetra Tech prepared preliminary and final plans for streetscape and engineering improvements for the 4,000 foot segment of Lakewood Boulevard from 5th Street to Florence Avenue in the City of Downey. The project included additional through lanes, extensive median and parkway improvements, decorative lighting, street furniture and both potable and recycled water improvements. Great care was taken to minimize impacts to private development and to provide a seamless transition between old and new areas. The project created an aesthetically pleasing corridor, while decreasing construction cost savings of over $500,000 through the use of recycled pavement.

La Palma Avenue / Kraemer Boulevard Intersection, City of Anaheim, Anaheim, CA — Project Engineer for the $2.4 million widening of La Palma and Kraemer Intersection for the City of Anaheim Orange County, including right-of- way engineering and utility coordination. Tetra Tech prepared plans, specifications and cost estimates for the widening of this key arterial intersection in the City of Anaheim. The project involved the development of a Precise Alignment Plan, Landscape Concept Plan, and legal descriptions for 8 parcels. The project included the design of a raised, landscaped median, parkway landscaping in both the City area as well as a large slope in Caltrans right-of- 12 way, and significant redesign of private property improvements impacted by the roadway widening. The approval process included obtaining an easement and encroachment permit from the County of Orange as well as an encroachment permit from Caltrans. Other elements of the project included the design of a traffic signal, traffic control, a MSE retaining wall, and utility improvements.

Firestone Boulevard Rehabilitation Old River School Road to Lakewood Boulevard, City of Downey, Downey, CA — Project Engineer for the construction of sidewalk and pavement rehabilitation of an over one mile reach of Old River School Road in the City of Downey. The project includes pavement reconstruction and rehabilitation, reconstruction of curb ramps per current ADA criteria, and signing and striping.

Chapman Avenue Widening, City of Orange, Orange CA — Project Engineer for the alignment study for a one mile segment of Chapman Avenue. Responsibilities include the development of base plans and cross sections for the purpose of alignment analysis and the completion of a summary report outlining roadway widening costs and right- of-way impacts for various alignment alternatives. Tetra Tech completed alignment plans and is designing final PS&E for a 1 mile widening of Main Street from Palmyra Avenue to Chapman Avenue. This project included design of roadway, water line, drainage, utility, landscape, and lighting improvements. Project also included traffic control plans, signing and striping plans and traffic signal modification plans. Parking lot modifications were also involved on the project.

Katella Avenue Smart Street Improvements, Orange County, CA — Project Engineer for sections of the Katella Avenue Smart Street running through the cities of Los Alamitos, Cypress, Anaheim and Stanton. Responsibilities included the preparation of street plans, cross sections, utility coordination, water vault design and the preparation of legal plats and descriptions.

Bus Stop Improvement Projects, City of Santa Clarita, Santa Clarita, CA- Project Engineer for the improvement of 23 selected bus stop locations throughout the City of Santa Clarita. The design of each bus stop addressed the safety and accessibility needs of the rider, passenger with disabilities, driver, pedestrians, cyclists, motoring public, and people living and working near the stops. Each site specific bus stop safety improvements included the sidewalk access, concrete pads, shelter and amenities, adequate right-of-way, grading/separating walls, signage, bus approach zones, future needs, and existing site constraints including utility features and covers. Mr.larvi also provided utility research, data collection, conceptual design report, and final plan, specifications and estimate. The project met all federal guidelines and requirements, City procedures and guidelines, and Transit Agency regulations.

Orangethorpe Avenue Widening, City of Buena Park, Buena Park, CA- Project Engineer for the widening of the south side of Orangethorpe Avenue from Stanton Avenue to Thomas Street. Topographic survey of 50-foot cross sections were completed and site investigation and research of the crown elevation and gutter lip elevations were provided.

Additional detail collected at each location where new ADA curb ramps, and cross gutters were constructed. 13 KREUZER CONSULTING GROUP
Mr. Becker has 29 years of outstanding success in delivering complicated public and private construction, infrastructure, real estate and transportation projects from inception to completion. His background includes all phases of project coordination including feasibility, technical writing, conceptual planning, environmental clearance, final design, entitlement processing, obtaining agency approvals and construction management.

Over the last 10 years, he has specialized in comprehensive storm water compliance services for design and construction clients. As a State Certified QSD/QSP; Certified Professional in Erosion and Sediment Control; Certified Erosion, Sediment and Stormwater Inspector, he has provided the following services:

EDUCATION:

B.S. in Urban Planning California
• Prepare bid estimates and develop proposals and marketing State Polytechnic University, materials. Pomona
• Prepare Water Pollution Control Programs/SWPPPs AFFILIATION:
• Water Quality Management Plans Construction Management Storm Water Data Reports Association of America
Project Management Institute
• Provide Qualified SWPPP Practitioner inspection services • Design Water Pollution Control Drawings REGISTRATION:

Qualified SWPPP Developer and
• Establish cost effective Best Management Practices Practitioner (QSD/QSP) #24331 • Perform QSP services for approximately 20 projects per quarter including being the Water Pollution Control Manager of record for Certified Professional in Erosion and Sediment Control #7408
several Caltrans projects
Recent project experience includes:

Certified Erosion, Sediment and
Storm water Inspector #3080
OSHA 10 and 30 Safety Certified
■ WQMP for Williams Street Roadway and Storm Drain Improvements in Tustin.
■ WQMP for Valencia Avenue Street Improvements in the City of Brea. ■ WQMP for Imperial Highway Greenbelt Improvements in the City of Brea.
■ WQMP for the Anaheim Convention Center Grand Plaza in the City of Anaheim.
■ WQMP and SWDR for SR-1/01d Newport Boulevard Intersection Improvements in the City of Newport Beach.
■ WQMP and SWDR for SR-1/Broadway Road Intersection
Improvements in the City of Laguna Beach.
■ Numerous SWPPP's for various construction contractors in Southern California.
14 ERIC W METZ, PLS
Mr. Metz has over 23 years of professional experience in land surveying and engineering work for government organizations, public agencies, and the private sector. His experience includes preparation of Records of Surveys, Tract Maps, topographic surveying, boundary surveys, aerial control, GPS control surveys, right-of-way mapping, ALTA surveying, and construction staking. Mr. Metz also has extensive knowledge in AutoCAD Civil 3D, Revit and Navisworks BIM software.

Project Experience:
• Orangethorpe Ave Widening Phase 1 & 2, City of Buena Park, Buena Park, CA Project Surveyor responsible for topographic survey, right-of-way survey, property research, legal descriptions and plats for right of way acquisitions and temporary construction easements required by the city. In addition, provided construction staking support for the project.
• Bus Stop Improvement Projects, City of Santa Clarita, Santa Clarita, CA Project Surveyor responsible for topographic survey, survey control plans, utility research, legal descriptions and plats for right-of-way acquisitions and temporary construction easements to meet city requirements.
• Lakewood Stormwater and Runoff Capture Project, City of Lakewood, Lakewood, CA
Project Surveyor responsible for topographic survey and cross sections of the flood control channels. Legal descriptions and plats were prepared for proposed city storm drain easements across county land.
• Waste Management (Southern California Sites)
Project Surveyor responsible for topographic survey, right-of-way survey, property research and construction staking support for eight sites across Southern California.
• USPS Redevelopment, Pacific Industrial, Long Beach, CA Project Surveyor responsible for topographic survey, right-of-way survey, property research and ALTA survey of the United States Postal Service 10 acre sorting facility.
• Limekiln Creek Restoration Project, City of Los Angeles Bureau of Engineering, Los Angeles, CA
Project Surveyor responsible for topographic survey, cross -sections of the flood channels and site utility research.
• Houghton Park Community Center, City of Long Beach, Long Beach, CA Project Surveyor responsible for topographic survey, cross -sections and profile

KREUZER CONSULTING GROUP
Education:

Santiago Canyon College,
Survey/Mapping Sciences
Registrations/Certifications:

Professional Land Surveyor,
California No. 9198
Trimble Business Center,
Project Specialist
OPUS,
Projects Manager's Training
Professional Affiliations:

California Land Surveyors
Association
Orange County Land Surveyors
Association
Society of American Military
Engineers
survey, preparation of horizontal control plans, and preparation of existing conditions base map.
• Los Angeles Bureau of Sanitation Monitoring Station, Gardena, CA Project Surveyor responsible for utility research and topographic survey of the Dominguez Channel from right-of-way to right-of-way for approximately 1,000 feet at the West 135th Street bridge.
• Riverside Drive near Zoo Drive Bridge over Los Angeles River, Bridge No. 53C-1298, City of Los Angeles, Los Angeles, CA
Project Surveyor responsible for topographic survey to support the bridge widening and retrofit. Ongoing construction staking support.
• EL Paseo Drive Pedestrian Overcrossing Replacement, City of Santa Clarita, Santa Clarita, CA, Project Surveyor responsible for topographic survey, survey control plans and construction staking support. • Surveying and Mapping at Marine Corps Recruit Depot (MCRD) NAVFAC SW, San Diego, CA Project Surveyor responsible for topographic cross section survey of all roadways within the MCRD base boundary as well as project aerial control.
15 Senior Principal

EDUCATION
Master of Landscape Architecture,
California State Polytechnic University,
Pomona, 1981

REGISTRATIONS
Landscape Architect, CA #2311
Landscape Architect, AZ #19864
Landscape Architect, CO #508
Landscape Architect, FL #6666965
Landscape Architect, GA #1.535
Landscape Architect, HI #15118
Landscape Architect, ID #16574
Landscape Architect, NV #857
Landscape Architect, OK #0336
Landscape Architect, OR #456
Landscape Architect, TX #02138
Landscape Architect, UT #99-368388-5301
Landscape Architect, WA #1801.

AFFILIATIONS
American Society of Landscape Architects
Alfresco dining and seating, Glendora Avenue, Cest
Covina

BIOGRAPHY
As Principal of Clark & Green Associates
with over 30 years of experience, Michael
Green oversees project management and
design for the firm.

Mr. Green graduated from California State
Polytechnic University, Pomona in 1982 with
a master's degree in landscape architecture
and formed Clark & Green Associates in
1987.

During his career, Mr. Green has worked with
the City of Westminster Planning Department
and the :Port Authority for the City of Long
Beach in Environmental Impact Research
Preparation and Risk .Management
Assessment. He also is an ASLA award
winner.

Mr. Green has specialized in community
residential projects and streetscapes with an
emphasis on water management, conservation
and sustainable landscape design.

ANALOGOUS PROJECTS
Disney Resort/Platinum Triangle
Streetscapes, Anaheim
Brookhurst Avenue, Greenbelt/Streetscape
Improvements, Anaheim
Jeffrey/Alton and University/Ridgeline
Streetscape Improvements, Irvine, CA
Old Town Revitalization, Tustin
16 a F,
•
Years of Experience: 20
Education:
2002 BSCE, Civil Engineering,
University of California, Berkeley
Professional Registrations &
Certifications:

Registered Civil Engineer —California
No. 70812
Registered Traffic Engineer —California
No. 2519
Professional Affiliations:

Institute of Transportation Engineers
Member, Orange County Traffic
Engineering Council (OCTEC)

CCHARTZOG
CRABILL, Inc.

Mr. Scott Ma is a Senior Engineer with the traffic engineering consulting firm of Hartzog & Crabill, Inc (HCI). Mr. Ma is a registered Civil and Traffic Engineer with the State of California, and has over (20) years of engineering experience. Mr. Ma has a wide breadth of experience in the field of traffic engineering and transportation planning.

Traffic Engineering
Mr. Ma's responsibilities are to provide project management and design expertise for various traffic -related projects. Mr. Ma's experience includes the preparation of Plans, Specifications and Estimates (PS&E) for numerous projects throughout Southern California. These include traffic signal plans, traffic control plans, road improvement plans, and signing and striping plans.

Mr. Ma has experience in signal operations and the development, implementation and calibration of coordination timing plans. Mr. Ma has also conducted Engineering and Traffic Surveys (E&TS), traffic signal warrant studies, muitiway stop warrant studies, and traffic index (TI) calculations.

Transportation Planning
Mr. Ma has prepared numerous traffic impact studies, queuing studies, and shared parking studies for development projects. Mr. Ma has also participated and provided his traffic knowledge in the development of General Plans/Mobility Plans, Bicycle Master Plans, and Safe Route to School Plans.

Municipal Engineering
Mr. Ma is currently serving the Cities of Lake Forest and Hermosa Beach as consulting Traffic Engineer. He previously served as consulting Traffic Engineer for the City of South Gate. In his role, he has assisted city staff in the development of long-term Capital Improvement Programs (CIPs) as well as the day-to-day activities such as traffic -related requests from residents. Mr. Ma has applied his traffic expertise to provide plan check services, process Encroachment Permits, implement permit parking programs and review private development plans.

Prior Experience:

AECOM
Transportation En i_g neer
• Prepared Traffic Impact Studies
• Prepared Shared Parking Studies
• Conducted traffic signal warrant analysis
• Conducted truck turning analyses
• Conducted queuing studies
• Prepared Signing and Striping Plans
• Prepared Civil Improvement Plans
• Prepared construction costs estimates
2004-2008
17 4.1 Summary of Relevant Projects
Per the requirements of RFQ, the following provides a summary of five (5) recent projects that represent KCG's capabilities:

IMPERIAL AND PARAMOUNT INTERSECTION IMPROVEMENTS
Downey, CA
Prime Consultant:

Project Manager:

Firm Role:

KCG Contract Value:

Construction Value:

Design Completed:

Construction Completed:

Construction CO:

Contracting Agency:

References:

Kreuzer Consulting Group
Rick Kreuzer, PE
Project Management & Civil Engineering
$300 K
$4 M
Ongoing (2023)
Pending(2024)
N/A
City of Downey
Ed Norris -Deputy Director of Public Works
(562)904-7110
[email protected]
This project includes the design of the following improvements at the Imperial/Paramount intersection:
• Dual left turns southbound on Paramount
• Dual left turns westbound on Imperial
• Widening the southwest corner to allow for northbound U-turns on Paramount
In addition to the roadway geometry required for these widening improvements, the project also includes the following other enhancements:
• Reconstruction of all 4 legs of the intersection with concrete pavement. The limits of concrete will be approximately 300 feet for intersection approaches and 50 feet for departures. • Reconstruction of the entire intersection with concrete pavement • Construction of decorative crosswalks
• Reconstruction of all access ramps, sidewalk and driveways to meet ADA standards • Implementation of custom City bus shelters
• Modifications to the existing traffic signal
• New signing and striping
• Utility adjustments and relocations
• Minor modifications to existing landscaping and irrigation The project also required partial right of way acquisition and TCE's for four (4) adjacent properties.

ORANGEWOOD AVENUE IMPROVEMENTS
Anaheim, CA
Prime Consultant:

Project Manager:

Firm Role:

KCG Contract Value:

Construction Value:

Final Construction Cost:

Construction CO:

Design Completed:

Construction Completed:

Contracting Agency:

References:

Kreuzer Consulting Group
Rick Kreuzer, PE
Project Management & Civil Engineering
$700,000
$14M (Bid $13.8 M)
N/A
None to Date
2021
Ongoing (2024)
City of Anaheim, CA
Ellie Yazdani 714-765-5066
eyazdani@anaheim,net
KCG completed the final design for the widening of Orangewood Avenue from State College Boulevard to the Santa Ana River, a distance of approximately 3,000 lineal feet. This project includes roadway widening, structural retaining walls, new landscaping and extensive utility design including new storm drains and domestic and recycled water lines, significant off -site improvements and partial right of way acquisition from ten (10) properties. This project also required extensive traffic control plans and the preparation of a comprehensive Water Quality Management Plan (WQMP).

I \.J IlEIM
I

STREET IMPROVEMENT PLANS FOR THE CONSTRUCTION OF

ORANGEWOOD AVENUE
FROM STATE COLLEGE BOULEVARD TO SANTA ANA RIVER � -
� . Account No: 828-412-K939-7892 LEI — z
G
870-412-K939-7892
Fox— vvgq-,k J � a
( e
a CON VENTIORAc SYMBOLS
Tart xesTING TaaoI
OF,ANawelM WATER NOTES .. —
�.�a
x� o

ABBREVIATIONS
OOA ON MAP' r oN
�} s rais � r.rr vurvs (onaw€ nau€sm)
",...�+" w .;e TMa -a :.z `uu' '^` +i` unun aw+•s � rwr'n€ s- -,.�,aax:�.�."�i ev.ws � sxr�r uurn
** o Ra g
w asi> RRie'W,YFON plxii5 _
PYM
ecsx m v rv. w. _ ar cmeo-s„ ac=n ..xm zwu az urm, a ,c ev�� >� Aa Njd4 � � e_�TU '>X r_ .an•hvxi , , [7caART�RF.HT 39215..

TUSTIN ZONE 4 STREET IMPROVEMENTS
Tustin, CA
Prime Consultant:

Project Manager:

Firm Role:

KCG Contract Value:

Subconsultants:

Construction Value:

Final Construction Cost:

Construction CO:

Design Completed:

Construction Completed:

Contracting Agency:

References:

Kreuzer Consulting Group
Rick Kreuzer, PE
Project Management & Design
$120,000
None
$5.3M (Bid = $5.2 M)
$5.3M
None
2022
2023
City of Tustin
Joann Wu
Senior Engineer
(714) 573-3157
[email protected]
Our scope of work included the following tasks:

1. Pre -Design Field Reviews and Markouts

2. Field Survey for Access Ramps

3. Base Mapping

4. Final Plans

5. Specifications

6. Construction Cost Estimate

7. Pre -Construction Markouts

8. Bidding and Construction Assistance
i
ir.
x
0 CENTRAL AVENUE STREET AND WATER LINE IMPROVEMENTS
Brea, CA
Prime Consultant:

Project Manager:

Firm Role:

KCG Contract Value:

Construction Value:

Design Completed:

Construction Completed:

Construction CO:

Contracting Agency:

References:
• 8,600 feet of new 12" C900 PVC water line
• New water line cross connections at 6 intersections
Kreuzer Consulting Group
Rick Kreuzer, PE
Project Management & Civil Engineering
$350 K
$7 M
Ongoing
Pending/ 2024
N/A
City of Brea
Steve Kooyman (Interwest)
City Consultant PM
(530) 318-1066
[email protected]
• Abandonment and/or removal of approximately 9,000 feet of existing cast iron water pipe • Suspension of new water line from Brea Canyon Channel bridge structure • Rehabilitation of approximately 2.6 miles of existing roadway consisting of a combination of mill/overlay and total reconstruction
• Reconstruction of damaged curb, gutter and sidewalk
• Reconstruction of eighteen (18) access ramps for ADA compliance • Pavement striping and markings
• Full traffic control to facilitate construction of the improvements above

COAST HIGHWAY/OLD NEWPORT BOULEVARD IMPROVEMENTS
Newport Beach, California
KCG is preparing preliminary engineering, environmental documentation, and final PS&E for widening improvements of Coast Highway and Old Newport Boulevard in the City of Newport Beach. This project includes roadway, structural, drainage, utility, landscaping, irrigation and significant off -site improvements, right of way engineering, and CEQA processing through Caltrans.

Prime Consultant:

Project Manager:

Firm Role:

Contract Value:

Construction Value:

Final Construction Cost:

Design Completed:

Construction Completed:

Construct CO:

Contracting Agency:

References:

Kreuzer Consulting Group
Rick Kreuzer, PE
Project Management & Civil Engineering
$ 250K
$ 2.5M
N/A
Ongoing (2024)
Pending (2025)
N/A
City of Newport Beach, CA
Patrick Arciniega
949-644-3347
parciniega@ newportbeach.ca.gov
In addition to the featured projects above, KCG has completed street and public works infrastructure projects totaling in excess of $50 M in construction value over the last 5 years, some of which are summarized as follows:
22 The following are three public agency references who can attest to KCG's quality of work on similar projects:

Rudy Emami, PE
Desi Gutierrez, PE
Kevin Merrill, PE
City of Anaheim
City of Downey
City of Arcadia
Director of Public Works
Prinicpal Civil Engineer
City Engineer
(714) 765-5065
(562 )904-7110
(626) 574-5411
KCG Testimonials
23 KCG's Schedule of Hourly Billing Rates are depicted below. These rates shall remain in place for the entire 3 year duration of the subject on -call contract.

K)

KREUZER CONSULTING GROUP

SCHEDULE OF HOURLY BILLING RATES
OFFICE PERSONNEL:

Typists, Word Processors................................................................................... $50 Technician.......................................................................................................... $75 Design Engineer / CADD................................................................................... $110 ProjectEngineer............................................................................................... $140 Principal / Project Manager............................................................................. $220 FIELD PERSONNEL:

Survey Crew, including Truck and Equipment .................................................. $255 SUPPORT & MISCELLANEOUS COSTS:

Other Vehicles.......................................................................................... $0.55/mi.

Copies — Black & White............................................................................ $0.10/pg.

Copies— Color........................................................................................... $0.50/pg.

Plotting — Black & White............................................................................$2.00/ftz Plotting— Color..........................................................................................$4.00/ftz 24 KCG maintains insurance coverage in conformance with the City of Downey requirements outlined in the RFQ and we take no exceptions to the Standard City Professional Services Agreement contained in the RFQ. KCG has not been subject to any litigation since our inception in 2004. KCG's current Certificate of Insurance is provided below.

CERTIFICATE OF LIABILITY INSURANCE DATE©9fa7rzDz3712023

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTtFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER{S), AUTHORIZED REPRESENTATIVE OR. PRODUCER, AND THE CERTIFICATE. HOLDER..

IMPORTANT. It the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed.

It SUBROGATION IS WAIVED, subjectto the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsementfsr,

PRODUCER
Cornerstone Specialty Insurance Services, Inc,.
14252 Culver Drive. A299
Irvine CA 92504

INSURED
RAK Development. Inc, OBA. KREUZER CONSULTING GROUP
18872 MacArthur Blvd
Suite 2:10
Irvine CA 92612

CONTACT
NAME::

Tina Cowie
FIRNC No Ext.
(714)731-7700 Be,
(714)731-7750
E-MAIL
ADDRESS:
[email protected]

INSURERIBI AFFORDING COVERAGE
NAIC F
INSURER A:

Continental Casualty Company
20443

INSURERS
. Amancan Gas Co at Reading PA _
20427
INSURER. c
: Travelers. Casualty & :Surely Cc of America
31194...
''... INSURER D
:.

INSURER E
INSURER F'.

COVERAGES CERTIFICATE NUMBER:: 23124 COVERAGES REVISION NUMBER:.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE. FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO. ALL THE TERMS,
EXCLUSIONS. AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED

BY PAID CLAIMS,
MISS
.POLICY EFT.... POLICY EXR...

TYPE OF INSURANCE

LTR INSD VIVO POLICY NUMBER
MMfDDiYYYT MMdDOlYYYY LIMITS
COMMERCIAL GENERA6.. LIABILITY
_.

EACH OCCURRENCE
S 2.000.000
1'000'000
CLAIMS -MADE. [g OCCUR
PRENIIEES F. cRENTED
S
m--

ADDTL INSURED I P&NO
Y
Y
4017701676
C&CV2023
MED FXP(Anr dr. person)
0813112024 PER ru i. a ADV INJURY

GENERALAGGREGATE
s 10,000
A X

BLNKTWVROFSUBRO
s 2,000,000
GENL AGGREGATE UMITAPPLIE5 PER:
3 4,000,000
PROPOLICY ® JEC71

ECT L()C
PRobUCTB.GGMPIt3PAGG
S 4;D00,000.

S
OTHER::

AUTOMOBILE

LIABILITY

COMBINED SINGLE LIMIT
$. 1,000,000
Ea—Idrnft
..,.....

ANY AUTO
BODILY INJURY IPer pereiol
S..

A

OWNED LED SCHEDU
AUTOS. ONLY AUTOS.
�/
y
4017701'...676
06131i2023
0813112024 BODILY INJURY (Per a-denh
s...
3 HIRED NON-0WNED
H

PROPERTY DAMAGE
AUTOS: ONLY AUTOS ONLY
Par avvxaent
S
°
UMBRELLA LIAB i}GCUR
EAChtl t?GCURRENCE.
5 i;9D6'6DD
A
EXCEssMAR CLAIMS -MADE
::
7015518166
GBOV2023
08131f2024 AGGREGATE
5 1,000,000
DEI:1 RETENTfifJN..S
5 WORKERS COMPENSATION
��//
5 _
AND EMPLOYERS°LIABILITY YIN

STATUTE EORH
$ 1.000.00D
B ANYPRCPRIETiRfPARTNERIEXECUTIVE
NIA
Y
4017706618
0813112023
08t3112024 EL EACHACCICENT
OFFICERLMEMBER EXCLUDED?
iMadd.whr ih Nm

F L DISEASE EA EMPLOYEE
5 1 960,6m6
If Yes, dnscrhe under
DESCRIPTION OF OPERATIONS PW v
E L. DISEASE POLICY LIMIT
S t;000,000
Each Claim
$2,000,000
Professional Liability
C Clai 107138738
Clam Made
CV3112023 08/3112024 Annuaf A re ate
gg g
$2,000,000
DESCRIPTION OF OPERATIONS ! LOCATIONS ! VEHICLES R CORD 101. Additional Remarks Schedule, may hi, aNaeh ni if mare space Is mg,ired) W_
REProfessional Services. -Contract No. C21021-24
City afAlhambra. is Additional Insured for General Liability but only if required by written Contract with the Named Insured prior to an Occurrence and as per attached endorsement Coverage Is subject to all policy teams and conditions This policy shall not be cancelled nor reduced in coverage until after 30 days written notice of such cancellation or reduction In Coverage shall have been mailed to the City of Alhambra. For Professional Liability, the aggregate limit is the total insurance for all covered craims reported within the policy Period.

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Alhambra ACCORDANCE WITH THE:. POLICY PROVISIONS,

11.1 South First Street

AUTHORIZED REPRESENTATIVE
Alhambra CA 91801
t71988.2015 ACORD CORPORATION. AIR rights reserved.

ACORD 26 (2016103) The ACORD name and logo are registered marks of ACORD

Intentionally Left Blank

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY I FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkwa�

Intentionally Left Blank

October 13, 2023
Matthew Baumgardner, PE I Director of Public Works/City Engineer City of Downey
11111 Brookshire Avenue
Downey, CA 90241
• 11 11 1 iip�ri 11 1 1 • 11111011111 1111.! i.
1, L
Dear Mr. Baumgardner,
The City of Downey (City) is currently addressing a growing need to deliver various civil engineering projects specifically related to planning and operations of water/wastewater facilities and general capital improvement projects. To assist in delivering these projects, the City is seeking a group of on -call engineers that can provide rapid, cost efficient and high -quality engineering support.

MKN Sr Associates (MKN) is a local engineering firm that is highly specialized only in water and wastewater engineering, and together with our team of subconsultants, we want to be part of your team. Our team brings the necessary expertise in the water and wastewater infrastructure field and company size to deliver responsive, high quality engineering services. With our extensive expertise in water and wastewater management, coupled with our past experience working with the City of Downey and neighboring municipalities, exceptional value to your community.
we are well -positioned to deliver
MKN has a proven track record in delivering high -quality water and wastewater services to municipalities across the region. Our commitment to excellence is reflected in the successful projects we have completed in the past, including our team members' previous collaboration with the City of Downey. This prior experience has provided us with invaluable insights into the unique challenges and opportunities that your city presents.

Key highlights of our qualifications and capabilities include:

1. Best Value: The City will benefit from the savings associated with our low overhead and efficient company structure. As demonstrated by our org chart, MKN can self -perform much of the anticipated services.

2. Proven Similar Experience: MKN has delivered over 300 task orders on 25 different On -Call contracts in Southern California including multiple terms with your neighboring agency, Water Replenishment District (WRD). We are often the preferred consultant for On -Call contracts because of our responsiveness and value.

3. Qualifications Match Your Needs: MKN's staff have delivered 40+ wellhead treatment projects, 200+ miles of pipeline and 65+ Facility R&R projects. We also have PFAS treatment experience, as we are currently delivering a PFAS design project for Atascadero Mutual Water Company.

4. Multiple Senior Staff in Key Positions; Key roles such as wellhead treatment, pipeline design and planning are provided with multiple Senior MKN staff. This allows us to expedite projects or execute multiple task orders at once.

We welcome the opportunity to further discuss how our expertise in water and wastewater services can contribute to the success and growth of the City of Downey. We are confident that our qualifications and commitment to excellence align seamlessly with your goals and objectives.

We have reviewed the insurance requirements presented in the sample agreement and will be able to provide the proof of insurance as required, if selected for a contract. Additionally, MKN currently is not and has not been in the past five years, the subject of any litigation, settlements, or judgments.

Thank you for considering our proposal. We look forward to the possibility of working together to ensure a sustainable and prosperous future for the City of Downey.

Ryan Gallagher, PE Safa Kamangar, PE, PMP, CCM
Principal Project Manager

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkia

Intentionally Left Blank

MKN is a water, wastewater and recycled water
engineering firm located and focused exclusively in
Southern California. Our firm was formed and has
grown to over 60 professional engineers, planners,
construction managers/inspectors and support staff
because of the need from agencies similar to the City
of Downey's (City) Utilities Department. Since its
conception in 2012, MKN has focused on meeting a
growing need by public agencies for responsive,
technically capable consultants who are committed
to a long-term relationship based on excellence.

Water is o t r Focus
While MKN offers a wide range of water, wastewater
and water reuse expertise, these engineering services
represent a core competency for our firm.

Our principals have decades of experience in
management and leadership roles for some of the
highest ranked engineering firms in the world, and
we are excited to bring our expertise to the City. Our
team is ready to continue providing excellent service
and work products for the City.

MKN is Committed to the City o
Downey
MKN is committed to a long-term relationship
with the City.

MKN's Project Manager, Safa Kamangar, has
delivered multiple successful projects for the City's
Utilities Department in the past. Additionally, MKN
has delivered over 300 task orders on 25 different
On -Call contracts in Southern California including
multiple terms with your neighboring agency, Water
Replenishment District (WRD). We are often the
preferred consultant for On -Call contracts because
of our responsiveness and value. All services for the
City's projects will be delivered from our Irvine
office, situated only 30 miles from the City.
�Y
,,, c-
a z
200+ Miles of Pipeline 50+ Pump/Lift 35+ Tanks/ 40+ Wellhead 65+ Plant R&R Stations Reservoirs Treatment Projects Projects

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

Intentionally Left Blank

Hml��D!j
NNIMM"
1 - Rincon; 2 - EPIC Land Solutions; 3 - Cotton Shires, 4 - Architects Orange; 5 - Peterson Structural Engineering; 6 - Gerry Green; 7 - Underground Solutions

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

Dualffi-110124110m, M4429431,14
Mr. Kamangar brings over 25 years of experience in water, wastewater, and water reuse, planning, design, and construction management in both the private and public sectors. As a design engineer, Safa has performed hy- draulic calculations, mechanical design, detailed design drawings, devel- opment of specifications, site work, field engineering, testing, and startup and commissioning for more than 50 pumping facilities and more than 15 well facilities throughout southern California, including PFAS treat- ment.

Mr. Gallagher has 17 years of experience in the planning, design and construction support services for water, wastewater and recycled water systems projects. This experience includes a wide array of projects from planning to design to construction phase services for various wellhead treatment systems, conveyance and storage projects. Ryan has managed multiple on -call municipal contracts delivering task orders that range in size from $1,000 to +$1M. Ryan has been a consistent and reliable resource for the WRD On -Call where he has delivered 18 task orders. # #
W&Trura Onto so III rums mall is E91614mv I I I vei sell Mr. Nord has over 20 years of industry experience including design, analysis, and management of major water supply and water resource projects throughout California. josh Nord is experienced in water supply and distribution systems specifically pumping station design, water resources, surge analyses, hydraulic transient analysis and water system modeling. Mr.

Nord has evaluated, planned or designed over 15 pump stations and up to 300 cfs in pumping capacity. Mr. Nord brings a public agency perspective to . -orniects- Ii.-vi-ig servr-i, is District F-a , ippr fn1­fi&111tiJ)l2 J]1]4_JjC .2•P-Acips- 6 STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mkwan ON -,ALL PROFESSIONAL CIVIL ENGINEERING SERVICES

1 WA 21 till I LOH z 11TH =L 193 1W41 F�
Sarah Mathews is experienced with water and wastewater infrastructure and is a strong project manager. She has over 10 years of experience in design and project management of water and wastewater facilities. Sarah's experience includes facilitp and infrastructure R&R and she is NASSCO certified. Sarah was awarded Young Professional of the Year by the Ventura County APWA and was also named one of Autodesk Construction Solutions' "40 Under 40:

Champions of Construction 2021."
Mr. Liang has over 20 years of experience in planning and design of municipal water and wastewater systems, water transmission pipelines, wells, pump stations, and water treatment plants. Mr. Liang has recently served as project manager on several large wellhead treatment projects for the City of Fresno and several small, disadvantaged communities throughout California. He also has extensive experience managing projects receiving SWRCB administered funding and understands the State's unique requirements.

Mr. McCauley has experience in planning, compliance, and design engineering for both municipalities and private companies. Brian has led feasibility studies, operational improvement studies, construction management, and permitting efforts. Specific to WRD, Brian has managed 10 state funded projects, and numerous wellhead treatment projects ranging from planning to detailed design.

Mr. Lepore has over 20 years of experience in developing and managing comprehensive water, wastewater, and recycled water models and master plans for public utilities with a focus on GIS integration. Rob has served as a project manager and/or Water Resource Planner for more than 9S master planning and hydraulic modeling projects in central and southern California. In additionRob has pre,?
-.,ared 14 Urban Water Ma n A g ement Plans
and completed over 50 GIS implementation projects. He is also a Geographic Information System Professional (GISP) certified by the GIS Certification Institute. Rob has worked for a public utility, GIS consulting firm, and multiple enineerinvi firms, which has allowed him to focus and refine his execution Lffl 1018 1111 to K 10 9 10 M

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES m kAia

Kathleen Hong has 8 years of experience in the water/wastewater civil University of Catiforria, Irvine engineering field. Her experience includes planning and design of potable BS Civit Engineering water, sewer, and recycled water facilities within California. Her planning experience includes conducting hydraulic analyses for water, recycled water, Catifornia Professional, Engineer - and sewer projects where she uses hydraulic modeling software to build Civit - Na C90355 models, run simulations and summarize the results in a report. Her design experience includes various pipeline, pump station, and reservoir design EXPIRATION DATE: SEPTEMBER 30,2025 where she has prepared plans, specifications, cost -estimates, and provide Imakak 1111011m, w:aw91wst.1wyTiNY
4 construction support.

Mr. Reichmuth brings 20 years of design and field engineering experience with an emphasis in pipeline design, ranging from condition assessment and rehabilitation to planning and design. Pipeline experience includes various trenchless construction methods, such as horizontal directional drilling and jack -and -bore, and pipeline sizes up to 42-inches. Mr. Reichmuth has experience on multiple pipeline replacement projects,requiring abandonment and customer conversions.
tWX!11MTJ MWTU-11111 . I T;7W#J[jT W-A
mentproiectsrang,in from 1, 2,3_-Trichloro'>ro,,>ane to Arsenic, His _1•-•- Fro,_aa
experience includes water treatment facility planning, process evaluation, detailed design and analysis, plant civil design and cost estimation, permitting with state- and federal -agencies, collection of field data, pilot- and bench -scale testing, and construction phase services of facilities treating various water quality issues. Mr. Word also serves on the AWWA Desalination and Reuse Committee and Water Treatment Committee.

Mr. Martin is a Principal with over 30 years of experience in advanced water treatment processes, such as reverse osmosis, ion exchange, and specialty adsorbents. He is an expert in water quality issues of in the municipal and industrial industries, with over 30 treatment It designs and dozens of evaluations and feasibility studies. Mr. Martin has presented numerous papers at water industry conferences concerning water quality and treatment topics, and is a recognized expert in these fields.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Mr. Saleh has over two decades of experience as a civil engineer. His professional experience includes planning, design, construction management, and construction support services for a variety of public works projects, with specific areas of practice in water and wastewater. His relevant experience includes water distribution and treatment facilities, pumping facilities, treatment plant projects/processes, reservoirs, pressure reducing, and surge facilities. Wastewater projects include conveyance systems, pumping stations, and treatment plant projects and processes.

Mr. Brennan brings over 30 years of experience providing construction management and project management in the water resources industry. He worked for over 22 years with the Los Angeles County Sanitation Districts where he administered construction contracts ranging from $lM to $190M.

Peter also brings WRD experience, having provided construction management support for the ARC facility.
aNVOW"IBA811
_'�JLSLelll 11YUldf-11C 111UUt•fillig Cum lidg(filitfliLl Idig(f U1d111(fLtft0?)1f(f1111tf utzsIgn, and is a strong project manager. He has a strong understanding of agencies and municipalities needs and has worked closely with many in the region.

Mr. Bugielski is also experienced with water and wastewater infrastructure reviews to determine possible deficiencies and identify capital improvement A 11 + i-; + +; infrastructure I;,
11cc 31 CLO VVC as opportunities CD U optimize ZC existing + U achieve EXPIRATION DATE: SEPTEMBER 30,2024 the project goal as quickly and efficiently as possible.

Parasto Azami brings over 10 years of experience in water and wastewater engineering design delivering designs in the areas of gravity sewer, force main, water conveyance system, pump station, rehabilitation, and condition assessment. Her experience includes multiple, complex large pipeline design projects.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkoin

Founded in 1974, AO is a full service Architectural, Master Planning and Design firm specializing in Retail, Residential and Mixed -Use projects. AO has over 45 years of experience in architecture and in the building industry working with America's premier Multifamily, Retail, Commercial, Mixed -Use real estate developers. The firm is one of Southern California's most respected and sought-after Architectural and Planning firms and is widely recognized as an industry leader in the design of high quality projects.

Rincon Consultants, Inc. is a multi- disciplinary environmental sciences, planning, and engineeri consulting firm providing quality professional services to government and industry. We have 12 offic located throughout California with our corporate headquarters located at 180 North Ashwood Avenu Ventura, CA 93003 along with offices at nearby locations such as Redlands, Carlsbad, and Los Angeles core business area for Rincon is water infrastructure projects, and our firm has provided environment consulting services for water resources projects for 25 years. During that time, we have successful completed the environmental analysis and permitting processes for a number of water, wastewater, a 4 stormwater conveyance, storage, and treatment projects as well as other water -related infrastructu projects throughout California
10 k STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR

ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Mr. Green is a California registered electrical engineer with over thirty years of electrical design experience.

He specializes in the design of industrial power systems including electrical and controls systems for water and wastewater facilities. Recent experience is with pump stations, lift stations, wells, treatment plants, and septage receiving stations. He has performed electrical and control system design, electrical power system studies, observed construction progress, and performed equipment condition assessments for several water/wastewater projects and facilities in Southern California. Mr. Green, in coordination with MKN, delivered a Solar Evaluation Task Order under the current WRD On -Call.

For over 50 years, PSE has served clients in the municipal water market sector. PSE offers industry leading expertise in infrastructure for water reservoirs, pump and lift stations, stormwater facilities and related treatment plants for clean/potable water, recycled/reclaimed water and wastewater. PSE also brings extensive experience in the conveyance of water and wastewater including different types of structures such as chemical feed facilities, pumping facilities and diversion structures.

Cotton, Shires and Associates, Inc. (CSA) was incorporated in California on March 27,1974, and is a full - service geotechnical and geological consulting firm and California Certified Small Business Enterprise (SBE) with offices in northern, central and southern California. CSA is currently working with MKN on multiple projects, including WRD's Warehouse project in which CSA completed a geotechnical investigation and infiltration test in support of building and LID design.

Borchard Surveying and Mapping is a professional land surveying and mapping company that provides high quality, professional services to Architects, Individual Land Owners, Title Companies, Builders, Civil Engineering Firms, Water Districts and Cellular Phone Companies. Borchard Surveying is currently working with MKN on numerous projects, including WRD's Warehouse project in which Borchard Surveying is assisting in the Lot Subdivision for the WRD owned property.

Epic Land Solutions, Inc. (EPIC) is a full -service right of way and real property consulting firm, founded in 2000 with the mission to create land solutions for the public good. With over 60 staff employed firm - wide EPIC a a�,��roLects locally from its headauarters in Torrance.In t e Dast 5 years. EPIC has worked MIM
T4 I
Department of Water & Power [LADWPJ).

Underground Solutions, Inc. provides a proprietary Fusible PVC1 pipe system for water, sewer, and underground conduit and casing for HDD and duct bank applications. Underground Solutions has developed and continues to develop unique and proprietary technologies focused on the underground infrastructure industry.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mki,113

Intentionally Left Blank

El

Intentionally Left Blank

The MKN team has performed successfully on 25+
On -Calls for Clients and water/wastewater projects that are similar to the City's upcoming water/wastewater
projects. Many of these agencies are similar in size to the City and include many similar projects such as
wellhead treatment, pipelines, condition assessment and rehabilitation. Many of the relationships with these
agencies extend back to the start of the company and
our continued presence demonstrates the quality,
responsiveness and value our firm can deliver.

Key Experience Take-Aways:

MKN performance on 25+ On -Calls with
similar projects.
• 15 CA Funded DAC Projects.
• 40+ wellhead treatment projects, ects, including
PEAS treatment systems.
,,VENTURA
IN TA &^
-E R.

HANNEL ISLANDS BEACH
WAT
uLA
-A D OXN P,
C COMMUNITY SERVICES DISTRICT Ask
STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 1 ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mk,13 1

ITAI 11 P tT, RUT i
Lakewood, CA
MKN's Warehouse Project design is on
schedule and budget
MKN's ARC Solar Evaluation identified
performance issues
MKN was selected for WRD's Engineering Services On -Call (2020-2023), and through this contract delivered services for the following Task Orders:

1. Regional Brackish Desalter Pipeline (Task Order
2021-002)

2. Planning, Preliminary and Final Design of Warehouse
Building (Task Orders 2021-001, 2021-003, and
2022-002)

3. ARC Solar Evaluation (Task Order 2022-001)

4. PFAS Program Management (Task Order 2022-002)
These task orders demonstrate a broad range of capabilities and ability to respond to the full range of required services.

In addition to the current contract, MKN's proposed Project Manager, Ryan Gallagher (while at a previous firm), served as the Project Manager for the original Safe Drinking Water Program On -Call (2015-2018) and the subsequent On -Call Engineering Contract (2018-2019). In support of these
contracts, Ryan delivered multiple task orders, serving as the Engineer of Record and Project Manager for nearly all projects.

1. Maywood Feasibility Study

2. Maywood Design

3. Maywood Consolidation Study

4. Maywood Permit Support

5. Maywood Environmental

6. Lynwood Feasibility Study (Well No. 11 and 19)

7. Lynwood Design (Well No. 11)

8. Lynwood Storage Analysis

9. Sativa Environmental

10. Compton Feasibility Study

11. Annex Building Demo/Rehabilitation

12. Huntington Park Well No. 17 Hydraulic Model
il -IN . 1 4 0 . . 8
m13 STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR k ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Ventura County, CA
Serving as District Engineer, MKN provides proje'
management and technical support services for the Charm Islands Beach Community Services District. Serving as t District Engineer, the MKN team provides direct support CIP development, financial planning, project procureme
and execution, Board and customer communication a
technical support. The major efforts to date include t
following: I
• Valve Exercising and Replacement Design
• Asset Management Software Procurement
• Pipeline Rehabilitation
• Hydraulic Modeling for infrastructure reviews
• Lift Station Condition Assessment (7 LS)
• Development of District Standards
• Pipeline Design
• Sewer CCTV technical and procurement support
• Master Plan and Feasibility Studies
• Administration Building replacement technical a
procurement support ($3.2M construction cost)
• Support in Negotiating Multi -Agency Agreements
STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 01 14 ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkl,

On -Cali for South Coast Water •
Dana Point,, CA
MKN delivered this emergency design project
within 3 weeks from Notice to Proceed, and
delivered a cost saving approach.

NUT P I w �.i • 1
South Coast Water District selected MKN to serve as one of five firms on the District's multi -year On -Call contract. MKN has been executing projects both under this contract, as well as stand-alone contracts. Several relevant projects to WRD are noted below:
• Via California Pipeline Rehabilitation. This was an
emergency project that included replacement of an existing 10-inch AC pipeline and lining of the 16-inch casing for a section of failed pipe crossing the 5 Freeway. MKN delivered the design within three weeks of Notice to Proceed, and delivered a cost saving approach that utllized readily
available Certa-Lok restrained joint PVC in lieu of the District standard of fusible PVC. Contract: -$30k
• Development Review. As part of the On -Call contract, MKN has completed two task orders requiring review of
plans submitted by vendors requesting to utilize District infrastructure for telecommunications. Contract: -$15k
Pump Station Condition Assessment. MKN completed a
condition assessment of 12 lift stations, including a pump efficiency and wet well capacity assessment. MKN identified 175 improvement/rehabilitation projects and prepared a
5-year implementation plan in close collaboration with
District operations and engineering staff. Contract: $110k.

Reservoir 2B/3B Replacement. MKN completed a feasibility design for replacement of two steel reservoirs. The analysis included alternatives analysis, hydraulic modeling and
concept design. MKN completed final design of the selected alternative which included two new 100,000 gallon steel tanks and associated road, piping and site improvements.

Contract: $500k
•Marriott Pipeline. MKN is in design for a 12-inch water main approximately 1,500 feet in length located in Dana Point in the vicinity of the Laguna Cliffs Marriott. Contract:
$220k
•LS 13 and 14 Stairs. MKN is in design for replacement stairs and guardrails at the District's Lift Station No. 13 and 14.

Contract: $16k
15 t STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

On -Cali for East Mies Community Services DI*str"lct
Bakersfleid., CA
Welt No. 18 Treatment:

East Niles • Services District (ENCSD • Distric
1p,rovides water and wastewater services to approximate ii• re• in eastern Bakersfeld. During the last 10 year
i . m our role as District Engineer MKN staff have provide lo,lanning, design, and construction phase engineerin
services i• • projects. Relevant to WRD, MKN h
delivered the following wellhead treatment projects:
• Well No. 21 Treatment Project - The work included
designing multiple GAC treatment systems (pairs of
vessels in series) to treat the water from two District wells (TCP), as well as designing the piping, valving,
backwash system, and appurtenances required to
support the treatment system at the Well 21 site.
• Well No. 22 Treatment Project - The work included
designing an adsorptive media arsenic treatment system
(single vessel with expandability) to treat the well water, as well as designing the piping, valving, backwash
system, and appurtenances required to support the
treatment system at the Kern Citrus Site.
• Well No. 18 Treatment Project - The work included
designing an adsorptive media arsenic treatment system
(single vessel with expandability) to treat the well water, as well as designing the piping, valving, and
appurtenances required to support the treatment system. • Well No. 19 Treatment Project - this work was similar to Well No. 18 with the exception that this system
STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 16
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkwin

Newport Beach, CA
MKN was selected for the City of Newport Beach On -Call in 2022 and has performed a series of task orders supporting various water supply planning and rehabilitation projects.

The task orders received to date included the following:
• Well Siting Study. MKN performed a well siting study for a new water production well. The siting study included
development of siting criteria and constraints,
infrastructure analysis, site specific evaluations and
preparation of recommended well locations.
• Surge Analysis. MKN performed a surge analysis to
identify potential mitigations measures to protect aging infrastructure.
• Cortland PRV. To abandon an existing pipeline within a private easement that had reached its useful life, MKN
conducted a hydraulic analysis to development a new PRV to ensure adequate fire flow for the impacted zone.
• 16th Street Constructability Review. MKN performed a
peer review of a pump station rehabilitation project. MKN identified opportunities to minimize potential for change orders, improve constructability and optimize the design. • Shore Cliffs Regulating Stations. MKN designed two new PRV stations for the Shore Cliffs area.

On -Cali for East Orange County Water Dlistrict
Orange County (Various Cities), CA
MKN has been providing as -needed engineering services to East Orange County Water District through various contracts since 2021. The task orders received to date included the following:
•Barrett Pump Station Replacement. MKN designed a new
pump station to replace an existing station that had
reached the end of its useful life.
• Water and Sewer Standards Update. MKN completed an
update to the District's water and sewer standards,
• Zone 3 to 2 Conversion. MKN designed new pipeline to
replace existing piping that reached the end of its useful life. Project also inclu•ded new distribution system and customer PRVs.
* Brae Glen Pipeline. Design of new pipeline and
abandonment of existing pipeline in private easement.
* Orange Knoll PRV. Design of new PRV and abandonment
of existing pipeline in private easement.
17 1 t STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Various Cities throughout CA
Various Cities throughout CA

BRIEF DESCRIPTION
University Enterprises, Inc. (UEI), a non-profit auxiliary organization of California State University, Sacramento, creates and manages programs and services that enhance
the University's educational mission. In support of this mission, UEI was awarded a Proposition I Technical
Assistance grant from the State Water Resources Control Board to help small Disadvantaged Communities improve
their drinking water and wastewater system. Starting in 2018, UEI has selected MKN to support various projects within this mission and grant award, including the following:
• Central Union School Water System Improvements
• Lancaster Mobile Home Park
• Foothill Mobile Home Park
• Coarsegold Elementary School
• Winterhaven Mobile Estates
• lone and of Miwok Indians
• Martins Mobile Home Community
Each project included technical support, either planning or design, to address water quality concerns within the subject community. The scope of each project was delivered to meet the requirements of Prop 1 funding.

BRIEF DESCRIPTION
The Rural Community Assistance Corporation (RCAC) is a
non-profit organization dedicated to improving the quality of life in rural communities across the United States. Founded in 1978, RCAC works tirelessly to provide a wide range of services and resources to rural communities, helping them overcome challenges and achieve sustainable development.

Starting in 2021, RCAC has selected MKN to support various projects within this mission and grant award, including the following:
• Averydale Mutual Water Company
• GabIlan/ Middlefield Road
• Bonita School
• Halcyon
• Ken Mar Gardens
The scope of each project was delivered to meet the
requirements of State Water Resources Control Board and SAFER funding.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkwn

Various Cities throughout CA
Self -Help Enterprises is a nonprofit organization dedicated to improving living conditions and economic opportunities for low-income families and communities in the Central
Valley of California. Founded in 1965, Self -Help Enterprises has been a leading force in addressing the critical needs of rural and disadvantaged communities, empowering
individuals, and creating lasting change. Starting in 2017, Self -Help Enterprises has selected MKN to support various projects within this mission and grant award, including the following:
• Athal Mutual Water Company
• r of Promise Mutual Water Association
• 1Gior io School
The scope of each project was delivered to meet the
requirements of the State Revolving Fund.

PFAS
Treatment
Rant
Planning
and Design
\t at
� *.: �w \ £„,� � `l:.x
y
4 Mutual
4 "l4 Water
\ i �t..�a � �ei'.:,a �:. 5:

EP`§ .,�{� p �dx.';`
�"�... � i` i.\
4,51 \ ".x�'z:"e Z
�ia *.: i�H� � 4h� \a 2,. ";
`�� ��
�..�.� `�.
�'. n�
Z ,z^ \. \ -,.. �.
:xv [: 7: � � C a

3. ;. : 1a 4.

MKN is currently designing two PFAS treatment systems for AMWC, referred to as Sycamore Water Treatment Plant and Northern Water Treatment Plant. Each system consists of GAC vessels, steel backwash tanks, booster pump station, surge tanks, and associated chemical systems, appurtenances and buildings. MKN completed pilot testing, alternatives analysis and preliminary design as part of a previous
contract. The preliminary design included hydraulic modeling to determine system impacts to centralized treatment of existing wells.
19: mk STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR

ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

6 Client Project Type Constituent
Atascadero Mutual Water Company
PFAS Remediation Program Management
Various
PFAS and PFIDS
Belmont Water Corporation
Well I TCP Treatment
Adsorption (GAC)_
TCP
Buena Vista Water Storage Dist.

Ag. Drainage Study
BWRO
Selenium
California Institution for Men
Chino Prison Water Treatment
Ion Exchange; GAC
Nitrate, Hardness, TCE
Camrosa Water District
Conejo WetIfietd GAC Treatment Evaluation
Adsorption (GAC)
TCP
Capistrao Beach WD

1.5 MGD/BWRO
BWRO
Salinity/Hardness
Capistrano CSD
Capistrano Desalter
BWRO, Greensand
Salinity/Iron
City of Arroyo Grande
Well No. 11
GAC and Greensand
Iron and Arsenic
City of Bakersfield
5 Wells Arsenic Treatment
Adsorption
Arsenic
City of Beverly Hills
City of Compton
Beverly Hills Desalter WTP
Well 16 and 18 - Planning
BWRO
Various
Salinity/Hardness

PCE/TCE
City of Delano
Well 32 Nitrate Blending Analysis
Ion Exchange
Nitrate
City of Fillmore
Fillmore WTP Treatment Study
BWRO
Salinity/Hardness
City of Fresno
Pump Station 177 Wellhead Treatment
Adsorption (GAC), Airstripping
TCP, Carbon Dioxide
City of Fresno
Pump Station 185 Wellhead Treatment
Adsorption (GAC), Airstripping
TCP, Carbon Dioxide
City of Fresno
Pump Station 345-1 Wellhead Treatment
Oxidation -Adsorption
Hydrogen Sulfide, Arsenic, Fe&Mn
City of Fresno
Pump Station 347 Wellhead Treatment
Oxidation -Adsorption
Hydrogen Sulfide, Fe&Mn
City of Goleta
Anita Well
GAC, Greensand, Airstripping
Fe & Mn, TTHM
City of Grover Beach
Grover Beach Nitrate Removal
Ion Exhcange
Nitrate
City of Guadalupe
Well 5
Ion Exchange
Nitrate
City of Lynwood
Well No. 11
GAC

PCE/TCE
City of Lynwood
Welt No. 19
GAC and Greensand
PCE/TCE and Fe & Mn
City of McFarland
McFarland Wet( 2
Ion Exchange
Nitrate
City of McFarland
McFarland Wet[ 4
Ion Exchange
Nitrate
City of Oxnard
GREAT Program Brackish Desalter
BWRO
Salinity/Hardness
City of Oxnard
Water Operations Support Contract
BWRO
Salinity/Hardness
City of Oxnard
Brine Optimization
BWRO
Salinity/Hardness
City of Oxnard
BS No. 3 Brackish Desalter
BWRO
Satinity/Hardness
City of Paso Robles
Sherwood Wells
Adsorption, GAC
Arsenic, Sulfide, Taste & Odor
City of Pismo Beach
Meadow Creek Welts
Oxidation -Filtration
Fe & Mn
City of Solvang
Well 22
Oxidation -Filtration
Sulfide, Fe & Mn
Confidential Client
Well
Cl, Greensand, RO
Sulfide, TDS
County of Dare
Skyco Color Removal
Ion Exchange
Color/ THM Precursors
Crescenta Valley County WD
Glenwood Treatment Plant
Ion Exchange
Nitrate
East Niles CSD
Well 18 Arsenic Treatment
Adsorption
Arsenic
East Niles CSD
Well 19 Arsenic Treatment
Adsorption
Arsenic
East Niles CSD
Well 22 Arsenic Treatment
Adsorption
Arsenic
East Niles CSD
Well 21 and 23 GAC Treatment
Adsorption (GAC)
TCP
Irvine Ranch Water District
Deep Aquifer Treatment System (5 MGD)
Nancifiltration (NF)
Cotor/Organics/Hardness
Jurupa CSD
Jurupa IX Plant
Ion Exchange
Nitrate
Jurupa CSD
Jurupa IX Plant Expansion
Ion Exchange
Nitrate
Kern Housing Authority
N. Shafter LLC
Ion Exchange
Nitrate
Los Osos CSD
Nitrate Removal Evaluation
Various
Nitrate
Maywood Mutual #2
Maywood Well
Greensand
Fe & Mn
Meiners Oaks WD
Wet[ 8 Nitrate Treatment Study
IX, RO, Biological Treatment
Nitrate
Monte Vista Water District
Well 33 Treatment
Ion Exchange
Nitrate, Hardness
Monterey Peninsula WMD
Seawater Desal Feasibility Study
SWRO
Satinity/Hardness
Nipomo CSD
District -Wide
Chloramine Conversion
TTHM
Port Hueneme Water Agency
Brine Optimization
BWRO
Satinity/Hardness
Sweetwater Authority
Richard A. Reynolds GW Desat Facility
BWRO
Salinity, Hardness, Fe&Mn
Three Crowns Industrial Park
Well 1-3 TCP Treatment
Adsorption (GAC)
TCP
University Enterprises
Central Union School District Arsenic Removal
Adsorption
Arsenic
University Enterprises
Coarsegotd Elementary School Arsenic Removal
Adsorption
Arsenic and Manganese
University Enterprises
Foothill Mobile Home Park
Adsorption
Uranium and Arsenic
UniversityEnterprises
Lancaster Mobile Home Park Arsenic Removal
Adsorption
Arsenic

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
A Eoi� "T
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mk

Client Project Name Diameter (inches) Material Length
Antelope Vattey/East Kern WA
95th Street East PS/Turnout
20 Steet
500
Anttl�Valley/East Kern WA
South Feeder Parallel. Pipetine
24,36,48
Steel
34,320
Arvin CSD
Arvin RW Disposal. Pipe[ine
18 PVC
18,480
California Rail Builders
North Kern WSD Canal 9-26
42 Conc/HDPE
400
Casitas MWD
Pipeline Loading Evatuation
33 Steet
NA
Casitas MWD
West Ojai Pipehne Project
8 PVC
5,600
Cayucos Sanitary District
Sewer Pipetine Improvements
8 PVC
3,500
Cayucos Sanitary District
Toro Creek Bridge Pipehne Rehab
8 PVC
100
City of Arroyo Grande
Fair Oaks Waterline Reptacement Project
8 PVC
2,025
City of Fresno
Regional, Transmission Mains
16-48

WSP, DIP
68,640
City of Fresno
City of Grover Beach
Frian!:����.

CDBG Waterline Rep[acement
60 6,8
WSP
PVC
26,400
5,500
City of Grover Beach
CDBG Waterline Replacement
8 PVC
2,400
City of Guadalupe
Tognazzini Welt Intertie
8 PVC
600
City of Modesto
Ninth Street Storm Drain Replacement
24-96

RCP/CIP
52,800
CitV of San Luis Obispo
Hiqh[and Waterline Reptacement
24 DIP
165
East Niles CSD
Redbank Rd Pipetine ProjLt
8, 14
PVC
6,800
East Niles CSD
Pesante Sewer Replacement
8 VCP
500
East Niles CSD
Water Master P[an
12-36
NA
67,500
East Niles CSD
Morning Or Transmission Pie
20 Steet
5,500
East Niles CSD
Wett 20 Flushing Pipeline Project
12 PVC
1,500
East Niles CSD
Brentwood Sewer Extension
8 VCP,PVC,HDPE
1,000
East Niles CSD
Pioneer Pipeline Project
12 PVC
1,400
East Niles CSD
Morning and 178 Intertie-
20 Steet
1,320
Fresno Met Rood CD
Various Rood Control Projects
18-48

RCP/CIP
21,120
Gunner Ranch
Wastewater Improvements
27,30
PVC
21,120
Kern County Water Agency
Northwest Feeder PS & Pipetine
42 Steet
21,120
Lakeside Union SD
LUSD Connection to Bakersfield
16 PVC
15,500
Las Virgenes MWD
Westlake Reservoir
30, 36
Steet
2,200
MontereV Count V WRA
Salinas River Diversion Eacilit.
20,30

WSP, DIP
10,560
Municipality of Jeddah
Urgent Works Storm Drainage Program
18-96

RCP/CIP
100+ miles
ND State Water Commission
Devils Lake Emergency Outlet
30,54
Steel, HOPE
3,500
ND State Water Commission
Southwest Pipetine Project and PS
24,30
Steet
448,800
Nipomo CSD
Supptementat Water Project
12, 18,24

DIP, HOPE
27,000
Nipomo CSD
Fronta e Rd Trunk Sewer Re lacement
24 PVC
4,200
Nipomo CSD
Branch St Water Improvements
8 PVC
2,100
Nipomo CSD
Joshua Road Booster Pump Station
24 North of the River MWD
Highland Park Improvement
8, 12
PVC
27,000
Santa Maria
WWTP Influent RpLg_!a]rovements.
42,48
PE
600
SLO County Food Control.

Nacimiento Water Pipe[ine
18-36

PVC, DIP
264,000
South Coast Water District
Via California Replacement
10 PVC
500
United Water CD
Alternatives Analysis
16 PVC
20,000
Valley Children's Hospital,
VCH Rio Mesa WeI.I. & Pipe[ine
12 PVC
1,800
Ventura Count v
Water Replenishment District
Pota����.
208th Street Pipetines
12 14,24,36
PVC
HDPE
20,00
2,400
Water Replenishment District
GRIP Conveyance Alternatives Anatysis
42 Steel
1 25,000
Water Replenishment District
Brine Pipeline
16 HDPE
2,000
West Basin MWD
Palos Verdes Pipetine
10, 12
PVC
16,000

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
k-[ ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Client Project Name Master Hydraulic Condition
Planning Modeling Assessment
Arvin 2019 Sewer Master Plan
Atascadero
Collection System Master Plan Update
Atascadero
Water Reclamation Facility Master Plan
Atascadero MIMIC
Water Master Plan Update
Atwater
Sewer and Storm Drain Master Plan
Atwater
Water Master Plan
Bakersfield
Downtown Master Sewer Study
Camrosa Water District
Non-Potabte Hydraulic Model
Channel Island BCSD
2020 Wastewater Master Plan
Channel Island BCSD
Channel Island BCSD
2020 Water Master Plan
Wastewater Infrastructure Report
Channel Island BCSD
Water Infrastructure Report
Corona
2018 Reclaimed Water Master Plan
East Niles CSD
2021 Water Master Plan
East Niles CSD
2008 Water Master Plan
El Monte
2021 Water Master Plan
Grover Beach
2018 Sewer Master Plan
Grover Beach
2018 Water Master Plan
Guadalupe
2014 Collection System & WWTP Master Plan
Guadalupe
2014 Water Master Plan
Guadalupe
2015 Water Master Plan Supplemental Report
Guadalupe
2021 Water Master Plan Update
Gunner Ranch
Infrastructure Master Plan
Heritage Ranch CSD
RW Study & WWTP Master Plan
Hollister
Sanitary Sewer Collection System Master Plan
King City
Wastewater Master Plan (staff experience with previous firm) Madera
Madera County IRWMP
Madera
Merced
Water System Master Plan Update
Water Master P [an Update
Merced
Water Master Plan
Morro Bay
Master Water Reclamation Plan
Nipomo CSD
Blacktake Collection System Master Plan
Oxnard
Recycled Water Facilities Plan
Oxnard
Recycled Water Master Plan
Oxnard
Water Master Plan Update

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkW.11 22

\
a
Client Project Capacity Type of Work
Bakersfield
Westside Parkway
100 cfs
Preliminary, Design
Burbank Water & Power
RW PS-1 Upgrades
3,000 gpm
Preliminary
Casitas MWD
Running Ridge Improvements
300 gpm
Preliminary, Design
Casitas MWD
Signal PS Replacement
600 gpm
Preliminary
City of Fresno
Recycled Water Storage Tank & Booster PS
TBD
Preliminary, Design
City of Fresno
Design of Booster Pump Replacements at
PS 89A, 133, and 150
TBD
Preliminary, Design
City of Oxnard
East Niles CSD
BS No. 6 PS
Brentwood PS Relocation
2,000 gpm
3,000 gpm
Preliminary
Preliminary, Design, CM
East Niles CSD
East Niles PS Replacement
2,000 gpm
Preliminary
East Niles CSD
East Niles CSD
Kern Citrus PS
Well 21 PS Phase 2
5,700 gpm
2,250 gpm
Preliminary, Design, CM
Preliminary, Design, CM
East Orange County Water District
Barrett PS Replacement
1,500 gpm
Preliminary, Design, CM
G.L. Bruno Associates
Freeway Tank PS
2,000 gpm
Preliminary, Design, CM
Guadalupe
Bonita PS Rehabilitation
1,500 gpm
Preliminary, Design
Guadalupe
Obispo Tank #2 PS
1,500 gpm
Preliminary
Hollister
Seasonal Return PS Facility
20 cfs
Preliminary, Design
Kern County Water Agency
23 Corner Tank PS
2,000 gpm
Preliminary, Design, CM
Kern County Water Agency
Cross Valley Canal Expansion
500 cfs
Preliminary, Design
Kern County Water Agency
North & East PS
40 cfs
Preliminary, Design
Kern County Water Agency
Northwest Feeder PS
70 cfs
Preliminary, Design
Monterey County WRA
Salinas River Diversion Facility
35 cfs
Preliminary, Design
Morro Bay
Desal Plant PS Improvements
1,350 gpm
Preliminary, Design, CM
MWD of Salt Lake/Sandy
15000 South PS
150 cfs
Preliminary, Design
ND State Water Commission
NO State Water Commission
Devil's Lake Outlet Project
Southwest Pump Stations
300 cfs
39 cfs
Preliminary, Design
Preliminary, Design
NFV-1 /Cat Water
Millerton Zone 640 BPS
3,000 gpm
Preliminary, Design, CM
Nipomo CSD
Paso Robles
Joshua Road BPS
Nacimiento Surface WTP
2,000 gpm
2,000 gpm
Preliminary, Design, CM
Preliminary, Design, CM
Private Agriculture
Canal Pumping Plant
45 cfs
Preliminary, Design, CM
San Lorenzo Valley WD
Regional Intertie No. 2-4, 6
350 gpm
Preliminary, Design
San Luis Obispo
Arlita BPS Replacement
1,500 gpm
Preliminary, Design
San Luis Obispo
Rosemont BPS Replacement
400 gpm
Preliminary, Design
West Basin MWD
Palos Verdes PS
1,000 gpm
Preliminary
West Stanistaus Irr. District
Pump Station 1 A
350 cfs
Preliminary, Design
Westlands WD
Pumping Plant 7-1 Expansion
6,000 gpm
CM

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk ­1 ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Per the RFQ requirements, change order data relating to MKN's last public works projects are presented in the table below:

Hollywood Beach Pipeline
Channel Islands Beach CSD
$432,520
$470,272
$470,272
No significant
change.

Barrett Pump Station
East Orange County Water District
$1,319,000
$1,457,100
$1,465,235
Owner initiated
change.

0.5% Change
Order.

Pressure Reducing Stations
City of Thousand Oaks
$491,000
$404,527
$406,833
No significant
change.

Emergency Interconnection
City of Thousand Oaks
$456,000
$378,285
$383,959
Unforseen
utilities.

Well 19 Arsenic Treatment
East Niles CSD
$1,500,000
$995,000
$1,006,848
Additional
Project
chlorine
sampling and
equipment cost
increase
(unforseen
condition).

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES m k.111.1 24

Intentionally Left Blank

City staff will be managing multiple projects over
the course of this contract. This requires the help of
experienced on -call consultants to ensure the City's
project managers have adequate time to manage all
assigned projects.

MKN is an ideal partner. MKN has delivered over
300 task orders on our existing 25+ On -Call
contracts, with our services exceeding $750,000
per year for some contracts.

This experience demonstrates our team can meet
the needs of our On -Call clients. This section
highlights the keys to our success.

MKN's Project Management Approach
This section describes our overall approach to
Project Management.

MKN's Project Management Procedures are based urp, nization on the driving forces to success which include: (1)
Organization, (2) Communication, (3) Risk
Management, (4) Quality Control, and (5)
Documentation. m ktin
N
MKN's success over the past decade has been
predicated on the belief that Client service is the
highest goal, and, therefore, our project teams are
assembled to achieve this goal.

MKN's Project Manager, Safa Kamangar, will strive
to understand your expectations for the work in
every respect important to you, such as work scope,
schedule requirements, level of detail, technical
quality, deliverable appearance, staff involvement,
team effort and cost.

Our PM will then identify the best engineers to staff
the project. While most companies operate with
separate "profit centers", MKN operates our entire
60+ person operation as a single business unit. For
the City, this means that there are no barriers to
where we can draw expertise and resources from,
and more importantly every MKN employee is
driven to deliver the best results for every Client
as we succeed as a company not as an office.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 25
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES 1 mk,

which are both encompassed in MKN's Quality
"Y111,06- U'- law", - 11,11
•W- I•
1W
Quality ling - Plan for Success
Our QMS requires the Project Manager to
plan for quality even before a contract is
signed. This means that our proposal
must include the following:
• Line Item Scope - this helps to ensure that the
budget is preserved through project execution.
• Line Item Schedule - QC is included in our task
linked Microsoft Project Schedules to ensure
that adequate time is allotted, this typically
requires 2-5 days.
• Identify QC Person - this person is identified
and confirmed prior to submitting.

Once a contract is signed, a Project Management
Plan is prepared which details key elements of the
project, including risks and quality reviews.

Quality Assurance - Prevent Errors
A key element of Quality Assurance is
our technical training which is conducted
every two weeks. Our engineers are also
supported by our design templates, calculation
spreadsheets and access to our Technical Practice
Groups which maintain and manage many of these
documents.

The Technical Review completed at the 10% project
phase is another key element of our Quality
Assurance program.

Quality Control - Confirm MKN Quality
16�? is Met
L For the City, MKN's President Mike
Nunley, will serve as the Principal -in -Charge which
requires him to conduct a monthly status meeting
with Project Manager Safa Kamangar. During this
call, project status will be discussed along with
adherence to QMS procedures and resource needs.

Every deliverable will be reviewed by MKN approved
QC Reviewers, who will follow our defined process
for QQ review. Our standard review forms will be
utilized which identify key elements of review.

These documents have been prepared based on our
team's extensive experience and "Lesson's Learned".

2. Standard QC Forms

3. Subconsultant QC Req's

4. Principal Review

Intentionally Left Blank

Our fee for each task order will be determined based on the scope of work task breakdowns, considering the specific requirements of the project. Invoicing will be on a time and material basis, not to exceed task order fee. Hourly rates to determine scope item fees are presented below.

POSITION
2024
� 2025
2026
ItNONEERS AN67tCHNICAL SUPPORT,
STAFF,
Administrative Assistant
$113
$119
$125
Engineering Technician
$123
$129
$135
CAD Technician 1
$148
$155
$163
CAD Design Technician 11
$168
$176
$185
Senior Designer
$184
$193
$203
Assistant Engineer 1
$164
$172
$181
Assistant Engineer 11
$182
$191
$200
GIS Specialist
$179
$187
$197
Senior Planner
$238
$250
$263
Planner 11
$222
$233
$244
Planner 1
$194
$204
$214
Project Engineer 1
$216
$227
$238
Project Engineer 11
$225
$236
$248
Senior Project Engineer 1
$238
$250
$263
Senior Project Engineer 11
$244
$256
$269
Project Manager
$249
$261
$274
Senior Project Manager
$259
$272
$286
Principal Engineer
$281
$295
$310
Project Director
$302
$318
$333
Senior Project Director
$324
$341
$358
the rate will be adjusted each year after at a rote not to exceed

DIRECT PROJECT EXPENSES
Outside Reproduction Cost + 10%
Subcontracted or Subconsultant Services Cost + 10%
Travel & Subsistence (other than mileage) Cost
Auto Mileage Current IRS Rate - $.625/mi.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 27
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mk'113

Intentionally Left Blank

�t

Intentionally Left Blank

SAFA
&_
121HON] k"Nin F-11
Safa Kamangar has over 25 years of experience in water, wastewater, and water reuse that includes planning, design, and construction management in both the private and public sectors. He has more than 15 years in managerial positions and have managed Design Engineering & Construction Quality Engineering Departments for 10 years during this time.

Relevant Projects
'V`Yfetl No.7 Eq�_,,ipping ­,,ind [Nsch,,,ti,�rc�,,e Pipe 1 WMWD Western Municipal Water District (WMWD) is constructing a new groundwater well to augment the non -potable water supply in Riverside County. DEA!s scope of work includes providing survey, environmental and California Environmental Quality Act (CEQA) review, final design, and construction support services to equip the new well. The project includes a deep well pump installed approximately 150 feet below ground surface, installation of a 200-HP electric motor and its control system, and construction of approximately 2,600 feet of new transmission pipeline. The proposed pumping facility will be housed in a new masonry block wall building, to be designed by DEA staff.

Weits 27 and 28, Geusdertce I Dowr�,ey, CA
Project Manager. As a sub -consultant to Geoscience, provided engineering services for the design, installation, and equipping of two new groundwater wells for the city's water system. With each well anticipated to supply 2,500 gallons of water per minute to the city's distribution potable system, the combined total well production could account for 25% of the city's future potable water needs. Project tasks included environmental and regulatory permitting compliance; preparing a preliminary design report; developing design plans and technical specifications for the equipping of both wells; and providing engineering support, construction coordination, and inspection services during construction.

Pci,,rt,,,:,,,1a Pa�rlk Weil 1 La 111abra, CA
Project Manager for the design -build of a well for the City of La Habra. The 150-hp well pump and motor were designed to be 350-ft deep and capable of producing 1100-gpm of groundwater which will be conveyed through a 12-in PVC-C900 pipeline into the City's La Bonita Park blending reservoir. The station will be connected to City's SCADA system for fully automatic operation. 6" k NUC SteaA P�pe Relocatim, PrOirn.6.,,­.artat Design, I Corpi s Chrisb, IFX Preliminary design and cost estimate for relocating approximately 3 miles of 64" CML&C push-on/welded steel pipe feeding City of Corpus Christy's main treatment plant. The existing pipe is in conflict with railroad expansion (under design by DEA:s Rail Group), and required relocation away from the new tracks and into a new easement. Analyzed three alternative relocations along with cost estimates for review by the City and their consultant. Final design is pending funding approvals.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES Mk"Aid'

RELEVANT EXPERIENCE (CONT.)
NPDES Tras�h� Provians BMP Planning Services I Lag4.ina Woods, CA DEA is currently providing the City of Laguna Woods (City) with NPDES Trash Provisions BMP Planning services.

DENS tasks include a Feasibility / Data Needs Assessment including assessing the City's built environment and available CIS mapping within the context of the trash provisions. The City is interested in identifying opportunities to install approved BMPs within public right-of-way, which can capture and treat stormwater from their public and private tributary areas. This will eliminate the need for installing and maintaining trash capture BMPs in private catch basins. This installation, along with installing full trash capture devices on all public catch basins, will bring the City in compliance with the State Trash Provisions. DEA will consider treatment of the required water quality flows for high -density residential, industrial, and commercial land uses under the Priority Land Use definition. Safa is serving as project manager overseeing DEA tasks for this project.

LeaOhy Av-,,,,,nue WeR DC el and Eq�,Oppinpia Beifflov,,'er Sor-y"'I'lerset Mutuat W.@Aer Conn,,pany 11 BelJ'A"tower, CA Project Manager for engineering and hydrogeological services for preliminary and final design (PS&E Preparation) as well as construction support and inspection services. Project included the abandonment of an existing well, and drilling and equipping of a new high -capacity groundwater well, located on their property at 14740 Leahy Avenue.

The project will result in fully functional and reliable water well capable of producing sustained yields of high - quality water for domestic uses.

Ca,,­,,-,,,rosa Water District Near­T,,,_,,r,m CW Development I C miariRo, CA Project Engineer. Project consists of site assessments of the District's above -ground facilities, including potable, non -potable, and wastewater sites. These included assessments of existing pump stations, reservoirs, lift stations, treatment facilities, and wells. Prepared technical memoranda summarizing site conditions and recommended improvements for near -team Capital Improvement Project development.

Marrikom Pip,,-.[4­e, Sontin Coatst Water District I Dana Poiral, CA Technical Advisor and QA/QC for design of approximately 1,500 feet of new 12-inch water main in the vicinity of the Laguna Cliffs Marriott in the City of Dana Point.

Serranc) 0.­e,elk Raw Watei-lire Rep[acennent, irvire Ranch Water 4-vine, CA Technical Advisor and QA/QC for design of new 8-inch raw water line, with over 100 feet of trenchless/ tunneling pipe. Task included identifying optimum alignment, coordinating with utility and jurisdiction agencies, preparing plans, Specification, cost estimate and construction schedule.

Panorarna Pipeiirie Rep[acennent, East Orantge Cm,,mty Water al.. is 1 Orainge, CA Technical Advisor and QA/QC for preliminary and final design of 4,000 feet of new 12-inch waterlines and three pressure reducing facilities. Major tasks included alternative analysis, utilities research, and development of a plan and profile, coordination with County for Traffic and pavement replacement requirements.

Ha,�enda , U a La 11abra, CA
Project includes preliminary analyses, final design, and construction support services for the City of La Habra's new Hacienda Park Booster Pump Station. The new pumping facility will replace two existing pump stations that currently serve the Foothill Zone of the City's water system. The proposed facility will be constructed within the Hacienda Park Basketball Courts Area, and will include five vertical turbine pumps covering a flow range of 25 to 3,500 gallons per minute. Construction of approximately one mile of 12-in transmission pipe, a stationary generator, and a surge tank are included as part of the project.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON —CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

RVEJAIN

GALLAGHER, PE

PLANNING/FEASIBILITY
Over the past 17 years, Ryan has completed over 100 projects with 25 public agencies in Southern California, serving as the Project Manager for the majority. The estimated construction value of the projects that have been planned, designed and/or constructed exceeds $250 million. Projects include planning through design for water, wastewater and recycled -water conveyance, pumping, storage, and treatment.

De"sat ,,-,er Conveyance Desigi­, Water District Of S0L0Jwn,--,,, Catifornia lrrwce, CA
Principal in Charge for the expedited alternatives analysis and design of four pipelines for WRD's future Regional Brackish Water Reclamation Facility. Project included evaluation of six alternative alignments, including both trenchless and open cut approaches, and final design. The project includes -2,400 linear feet of pipeline, including a 14-inch HDPE brine line, two 24-inch HDPE product water lines, and a 34- inch HDPE source water line.

PFAS Nrograrr,� sla.­�,,,,��'ge�. nerit, W.,,,.,,a,,z,er W.-,pieni ishnien,,t Distri,,:­,t caf Ca[ifornia 1 Lakewood, CA
As Project Manager, providing technical and program support to the District's $61M PFAS treatment program. The program provides funding and technical support to an estimated 20+ PFAS treatment systems throughout the groundwater basin. Efforts include establishing program forms and processes to develop the program elements, coordination with pumpers and consultant teams, and supporting District Program Manager.

Et­10-amental Review, Sativ,i Los Angek,--s 'Coa�ity Water D[strict !� Los Angelies Got,.Enty, CA Project Manager for development of Initial Study -Mitigated Negative Declaration and supporting studies to assess the construction of a new iron and manganese oxidation - filtration treatment system at the District's Well No. 5.

LN'TWTF 0p'6rnizafl.,,­,)r,,., ft.,�.aer Rep;enishment District vf Sok.,thern CaWo.,mr,.,�a �WRD) I Long Beach, CA
Served as the Task Lead (sub to Woodard & Curran) for review of water supply conditions at the Long Beach Water Reclamation Plant, owned and operated by Los Angeles County Sanitation Districts. The evaluation included review of supply and operational data, existing agreements and on -site investigations in support of developing alternatives for increasing supply of tertiary supply to the adjacent advanced water purification facility, owned by WRD and operated by Long Beach Water Department (LBWD).

Conducted additional analysis of recommended projects including a site assessment, sizing and cost estimate for an injection well, and a condition assessment for the El Dorado Backup Pump Station and the South Lake Pump Station, both owned by LBWD.

Storage B0d�rig, Wc,tter Di,-,trict C)f SOUhern
Caiiiforoia I ,Lake�%eood, CA
As Project Manager, prepared conceptual design and preliminary design for new 8,000 square foot pre-engineered storage building to support Water Replenishment District's hydrogeology and operations groups. The effort included a permitting and land use analysis, space planning, interviews with WRD stakeholders, alternatives analysis, FAA permitting, cost estimate and implementation plan. The estimated project cost was approximately $2.5 to $31M.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES m kpisn,

Ryan Gallagher, PE

RELEVANT EXPERIENCE
HD,F1E Brine Pipekiirw, Wat.-,,r Replen6st,nn.,ent of SOUthenn, Cal[fornot 1, Pico Rivera, CA Principal -in -Charge for this project that included an approximately 2,000-foot, 16 -inch- diameter, high -density polyethylene (HDPE) pipeline in the city of Pico Rivera. The pressurized pipeline conveyed brine from the Groundwater Reliability Improvement Project (GRIP) Advanced Water Treatment Facility (AWTF) to a 63-inch trunk sewer owned and operated by the Sanitation Districts of Los Angeles County (LACSD). The work included both preliminary and final design.

So�ar Evs,,.:aivion, Kater R,,.,pienisFtrnent tlistrlct of Souitl'%.ern, CaHforriia I Lakewood, CA As Project Manager, oversaw the delivery of a solar performance evaluation for the Albert Robles Center. The evaluation included a comparison of projected and actual energy production of the facility's 350 kw rooftop solar panel system.
�Wllmjz=
Barrett Station Repiacem,,,,,,,,,nt, East Orange Cou.,nty Water Do;Nrict 1 Orange, CA Project Manager for the design of a pump station replacement. Project included preliminary and final design for the replacement of an existing pump station. The new pump station was sized at 1,500 gpm and consisted of a package pumping system, associated piping, controls and valving. The construction included a temporary pumping system to allow for continued operation during construction and replacement of an elevated transformer (SCE). The total construction cost for the project was $1.5M.

BWRDF Facibty Miiiisn,,,r Part Hk;er-kerne, Port Hu-,,.�nerre Water Ager,�cy I Pon '11w,,,.!renn,,,e, CA Project Manager for facility -wide condition assessment and CIP development for 3 MGD brackish groundwater water facility (BWRDF). The condition assessment included structural, electrical, operations, and process components.

Effort included development of a five-year CIP, project descriptions, and cost estimates for $2.7M in rehabilitation and improvement projects. Developed a model to evaluate water supply impacts and associated costs related to changing groundwater allocations, operating scenarios, water quality targets, and cost of new water. Included coordination with various agencies and identification of potential partnerships. Prepared and presented results of the process and results to the PHWA Board of Directors.

Brine Port W'­,A;,�r Agency '� Pert CA
Project Manager for the preliminary design to optimize water recovery for the Agency's brackish water reclamation demonstration facility (BWRDF). The study included water quality and performance evaluations of the existing three I mgd membrane skids — 2 nanofiltration (N0)11 reverse osmosis (RO) — and development of a brine optimization design. The design included two options for inclusion of a third -stage skid to increase recovery to 90 percent from the current 80 percent. The evaluation included preliminary design drawings and an economic assessment.

S,.­oico,,,,, Conditionir,,g FaciUty Renov,­,�,,,,flon VenUira, ("A Project Manager designed two chemical systems, sodium hydroxide and polyphosphate, as part of this water treatment facility upgrade. Additional responsibilities included various civil -related site improvements.

Sodurn Bisukllf-te ,.�nk Repkacennent, Ceirarat Coast Water Ai,,vthor�ty ,CCA) [ Sara'a, Yr-,,ez, Project Engineer for a facility modification at the Santa Ynez Pumping Facility owned by the CCWA. The scope included review of the existing horizontal storage tanks, development of replacement options, and design of the recommended alternative.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

JON

HANLON, PE

QA/QC MANAGER & WELLS
Jon Hanlon has over 25 years of experience as a mechanical engineer, project engineer, project manager, and ultimately as an operations manager for a Fortune 500 consulting engineering firm, joined MKN and Associates, Inc. (MKN) specializing in water, wastewater, and water reuse engineering for public agencies.

Mr. Hanlon's experience has included design, analysis, and construction of dozens of municipal water production and storage facilities throughout California. ft,-Aer Treatrnera Nara Pipe GaUery I San Lu"is Obispu, CA Project Manager. Performed design services for condition assessment and replacement of 30-inch steel pipe at the City's Water Treatment Plant. A recent pipe inspection identified a portion of a piping that connects the treatment plant to the City's storage and distribution system in need of immediate repair due to sever corrosion. MKN provided the City with technical memorandum outlining potential new piping configurations and methods of rehabilitating the existing pipe. Based on this memorandum the MKN developed construction documents for installation of a new pipe to both replace the severely corroded section for existing pipe and to provide the City more flexibility in operation for the treatment system.

Water Master Pian I CIty c,�f Grover Be�,iclh,, CA
Project Engineer. Project consisted of a condition assessment and capacity evaluation of the City of Grover Beach water distribution system. Specific responsibilities included evaluation and condition assessment of existing water production, storage, and distribution facilities; development of potential future requirements and evaluation of equipment alternatives; development of Capital Improvements Program (CIP); and cost opinions for existing and future improvements.

CA
Project Manager. Project consists of a condition assessment and capacity evaluation of the City of Guadalupe water distribution system. Specific responsibilities included evaluation of existing water production, storage, and distribution facilities; creation of a GIS-based hydraulic water model, preparation of GIS- based system atlas, review of water quality requirements and goals; development of potential future requirements and evaluation of equipment alternatives; identification of deficiencies under existing and future conditions; development of Capital Improvements Program (CIP); and cost opinions for existing and future improvements.

Water Mas�er Piai,,� and Sewer R,,,�te St,-,�dy 1 &'i.ri S�meor�, %,"""A Project Manager. Responsibilities included development of comprehensive Water and Sewer Master Plans. Recommendations were made for the capital improvements program and appropriate rate structures.

Risk Manag,,,,nnwr-,,t P.­ograrn D-,,veiopi­,,nen.,t, Atasc,;derc Water Copany CA
Project Engineer. Developed RMP for 23 facilities to comply with EPA Risk Management Program, OSHA Process Safety Management guidelines, and California Accidental Release Program requirements.

Wat,(­ Treat, rnent P1,,,,­,n(t I San ON5,,io Cociit-,,,ty, CA Project Manager. The San Luis Obispo County Flood Control and Water Conservation District (County or District) retained MKN to investigate plant process issues and recommend and design solutions to these problems at the Lopez Water Treatment Plant. The scope included design and preparation of plans, technical specifications

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR

ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

I M.,, MM
RELEVANT EXPERIENCE (CONT.)
and engineer's estimate to address coagulant delivery, measurement, and alarm systems. MKN also evaluated the failure of three existing automatically-backwashing strainers and prepared plans and specifications for replacement filtration equipment.

F,fio NIlesa Wetit, 'V'altey ChUdren's HosptaL I Made-ra, CA Project Engineer. Valley Children's Hospital (VCH) recently acquired the property located to the southeast of the existing hospital. The property consists of a golf course and includes a potable and non -potable water supply well.

VCH plans to improve the capacity of the non -potable well, improve the well to meet potable water standards, and incorporate the well into the VCH water system as an additional water supply. The Rio Mesa Well will also continue to be used for landscape irrigation of the golf course.

W wedti #7 Weu', iind Site Work, Ca0itas Municipal Water District [ Ojai, CA Project Engineer. Design of new well facilities to produce 400 gpm and the replacement of an existing well to produce 200 gpm. The wells are part of an integral well field and supply water the Ojai Water System. 'A Fa6t,,,,re An.,,,[ysis, Pteasant Valk,,ty COUnty Water Distrk_:t �; Vr,,,.,t-,ttura County CA Project Engineer. Municipal well failure analysis included review of well performance and construction documents.

Analysis identified mode of failure was due to well misalignment. Prepared report identifying options for replacement which included use of a smaller vertical turbine pump or submersible pump.

R,;,irvie,,,v, We,,,', Cal(egk_ias Municipal Water District I Cou.-ity CA Project Engineer. Project to rehabilitate an inactive Aquifer Storage and Recovery (ASR) well and return it to service as a backup groundwater production well. Project includes video and biological inspection of the well, followed by preparation of plans and specifications for redevelopment of the well and system upgrades. System upgrades consist of installation of a new pump and motor, new motor control center including variable frequency drive, programmable logic controller, provisions for backup generation, replacement of piping and associated appurtenances, and addition of a disinfection system.

Wi,Al", #11 Ti"eallment Pn,:,tject I Arroyo Grande, CA
Project Engineer. MKN provided construction observation services during construction of Well 11 for the City of Arroyo Grande. The project included installation of a submersible well pump, an iron and arsenic treatment system, and associated piping and building. Design of the project was by others and MKN provided the City with process engineering support following failure of the treatment system to perform as expected. The well water exhibited extremely unusual chemistry, resisting conventional methods of oxidizing iron. MKN has been working with City staff to develop alternative oxidation methods, including permanganate and ozonation, to achieve the required water quality.

A10head Arsenic and TCP Rt,.movw P1rUJs,,6_­ I D ,� ct I t Ir!", flvs,[ d, CA Project Engineer. The City of Bakersfield (City) operates five wells that have been taken out of service due to elevated levels of arsenic in the produced water. The location of the wells makes them key wells for the City's system when surface water supplies are limited. MKN was retained to evaluate proposed absorptive treatment systems at all five wells, and assist the City with final design and construction support. The conceptual treatment system design consists of iron -oxide based adsorptive media, pre -oxidation chemical skids, pH adjustment using liquid carbon dioxide, and organic chemical removal using activated carbon.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

HENRY

LIANG', PE
Mr. Liang is a Principal and the Operations Manager of MKN's Fresno, California office. He has over 20 years of experience in planning and design of municipal water and wastewater systems, water transmission pipelines, wells, pump stations, and water treatment plants. Mr. Liang has recently served as project manager on several large wellhead treatment projects for the City of Fresno and several small, dis;�dv;?V;We4L comr1unities t4roiLd-4 oo
•
1019IFFINIUMIMM-M
1 o-0
State-s unique requirements. ne currently serves as•r trie ACEC t aluorma Water Resources Committee.
soi,ft,l coas"I"', W"."",ter District, Sewe.­, & Recyclied Wi,Itc�r Mi,I'ster Ptar. Orcirlge 0�_,,,unty, CA
Project Manager for the water, recycled water, and sewer infrastructure master plans for the South Coast Water District. The updated master planning effort focused on identifying potential local source development options; changes in the District's physical infrastructure due to redevelopment, changes in water demand, wastewater generation, and recycled water use; analysis of demand patterns provided from the District's SCADA system and water meter records; and new sources of supply into the water system, including increasing treated groundwater, recycled water system expansion, Dana Point ocean desalination, and indirect potable reuse. The project included updating the model, analysis of the existing and future utility systems, identifying deficiencies, and recommending solutions.

In-depth analysis also included analyzing water demands, evaluation of storage requirements, analyzing different desalination plant locations, and optimizing interconnections with adjacent systems.
2020 Project Prog,,,­,,u, IJniversIty of Cakifoir.iii-� K,.,.rced kUCK1 I Me,. e,,ed, ",',A Engineering Manager for the Program Management of UCM's 2020 Project (Project), which is a $1.313 program that will add over 1.2 million gross square feet of new campus facilities, athletic facilities, recreational facilities, and off -site improvements. Responsibilities have included developing utility infrastructure technical requirements for the 2020 Project contract documents, investigation of UCM's existing utilities, analyzing the available capacity in the existing utilities, coordinating with PG&E, and performing reviews of the Developer's site utility design submittals.

W,,,a-.­,,r Master Pfan, Va��e�; Chitdren.'s Hea,'Ahcare I K�kdera, CA Served as the project manager in developing a Water Master Plan (WMP) for the hospital to analyze the ability of the existing potable water distribution system to serve existing and future expansion. MKN's scope included analyzing system water demands; developing demand factors for hospital expansion; developing the hydraulic model using Bentley WaterGEMS; analyzing the system under numerous scenarios, including service from a new supply well; identifying required system improvements to resolve deficiencies; and developing the capital improvement program.

Wate.r Maister P�a.­,, Update I Merced, CA
Project Manager for the water master plan update for the City of Merced. The City of Merced has a current population of about 80,000 and is expected to grow significantly over the next 20 years due to the establishment of the University of California at Merced. Mr. Liang helped in the development of the 2009 Master Plan and update of the Master Plan in 2013. The 2009 master plan project included development of a system -wide hydraulic water model, model calibration, system analysis, development of the CIP, and preparation of the Master Plan report. The City updated their General Plan in 2012, and Mr. Liang aided in the finalizing of the 2013 Master Plan update to incorporate the zoning changes in the General Plan update. The update also focused on the latest growth projections for UC Merced and

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

RELEVANT EXPERIENCE (CONT.)
identified system improvements that will be needed for the City to serve the university. The 2013 update included updating the City's water demands and water supply, updates to the water model to include recent improvements, and the development of a capital improvement program for the City's water infrastructure to accommodate growth through 2030.

Sewer and Stor,in Drain IN-41,aswr Pia,,n� Updiate,,, I Atwatet', CA Project manager for the 2010 Storm Drain Master Plan and project engineer for the 2010 Sewer Master Plan.

Comprehensive existing system condition assessments were conducted. Hydraulic models were developed for each system and used to analyze the existing sanitary sewer and storm drainage systems. Existing deficiencies were identified and improvements were recommended. The intermediate future and buildout project infrastructure were identified based on the City's General Plan land use. The project deliverables included master plans for the wastewater collection system and storm drainage system. The master plans described the analysis, recommendations, and included a practical capital improvement program.

G_n­n­,,,er Rar-tdlh, W ,re Mas(tef- P[an,,,/Grm,�ndwater Ptann I Mader, , (,,",A Project included development for the Infrastructure Master Plan and Groundwater Plan (GWP) for the 1,100+ acre Gunner Ranch West development located in Southeast Madera County. The Infrastructure Master Plan included planning, analysis, and capital improvement development for the water, sewer, and storm drainage infrastructure planned for the development. The project included detailed cost estimates based on several phasing scenarios. Mr.

Liang also performed a detailed evaluation of water demands from Valley Children's Hospital, which is located in the development.

Reedley Waaer Systenn Conniz,,.,,d Ftydra_uk,: Mod O, ..ind Anaty,,.its,, 1 R�,,,-edtey, CA Project manager for the development of the City's computerized hydraulic model in MWHSoft's H20MAP. Specific project tasks included development of the model from AutoCAD basemaps, pipe skeletonization, verified and rectified pipe connectivity, assigned model properties and control settings, and performing extensive calibration procedures.

Calibration included conducting field tests to obtain real data from well and fire hydrant testing and verification of model characteristics with field test data. Project tasks also included the analysis of three demand scenarios to determine the adequacy of the City's existing storage capacity.

Eastern Cc, my Regional Water S�.tivoiy of Foothilt and Mtau na�,iin Areas I Fresno, CA Project engineer for the regional study, which was performed to develop suitable information to support recommendations to the County regarding land -use policies, zoning, and development standards in order to protect groundwater resources to sustain water availability in the foothill and mountain areas throughout Fresno County.

Specific duties included evaluation of current planning and water development policies, evaluation of the latest master planning documents, processing of the County's available GIS information for water demand projections, development of current and projected water demand estimates based on technical data and population growth, involvement in numerous public information meetings, development of a water balance for the region, and preparation of a final report summarizing our findings and detailing evaluation techniques, results, and costs.

Deknac,�, Sy,,_mnrt Mod .5 catic,,krs A LAX Transii,,n­­,,,, An�,al[ysis, Los Anigeles Worlld Airports 1 Los Angetes, CA Managed the hydraulic transient analysis of the deluge fire water system modifications for the American Airlines High Bay Hanger at LAX. The distribution system, bypass piping, and fire pump station were modeled using Innovyze H2C)Surge v10 to analyze pressure fluctuations throughout the fire water system when the fire pumps turn on while the City's water system initially pressures the airport fire water system.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

BRIAN
ULEY-U
- ""Q- -
1*0
Mr. McCauley has experience in planning, compliance, and design engineering for both municipalities and private companies. Brian has led feasibility studies, operational improvement studies, construction management, and permitting efforts.

Additionally, he has served as a project controls lead for a large drinking water reservoir program.

F.'T-4rTTMTWJ0r#T-=
Gu�nner Rand",, West, W�''A[ 'I, er Inc. [ Made# -a, CaWo,,r'n, a Staff Engineer. Brian is currently preparing the design of the primary production well and equipping for the Gunner Ranch West development in Madera County, CA. Brian has prepared construction documents and provided bid support for the construction of the new well. Brian is currently preparing the equipping design to produce a fully operational potable water well.
ion, e Band of Mmok ,n,.�Jfians Alate t- Systern .nprcal ernc,-,,nts CA Deputy project manager providing planning and design services for the consolidation of a community water system and a full replacement distribution system. The system experienced water quality, water supply, and aging infrastructure issues and applied for funding under SAFER administered by the SWRCB DFA. The project included an alternatives analysis, design of the interconnection to an adjacent water system, chemical injection re-routing, and the design of a replacement distribution system serving each home. A full construction funding application was prepared to secure funding for the project. (Ongoing).

Gabi[,,,n and MiddLe',h,eld VA,'.aer Systen,� Conswkdaflon Feas'ibitiky Study I SaUnas, CA Deputy project manager providing planning services for the consolidation of six small- to midsize- community water systems with a large city water system. Each of the six smaller systems experienced unique water quality, water supply, and aging infrastructure issues. The project objective was to perform a consolidation alternatives analysis and feasibility study to ultimately apply for project funding administered by the SWRCB DFA. The project included a feasibility study analyzing consolidation alternatives, alternative routing of pipelines, cost considerations, and unique considerations of existing lateral connections on 100+ parcels of private property. A full construction funding application is anticipated to be prepared to secure funding for the project. (Ongoing).

S0es Piroj�,m I Maxwell, CA
Staff Engineer. The Sites Reservoir Project is a new, off -stream, 1.5-million-acre- foot reservoir and associated conveyance facilities being developed in Northern California with a target completion date of 2030. The estimated cost of the project is over $3 billion. Brian led the scheduling and contract administration efforts on behalf of the Project Controls team for the Sites Reservoir JPA. He has developed policies, procedures, and materials for both the production and review of contracts.

Coordinating with consultants and stakeholders, Brian has successfully managed the task order development and approval process for over $30M in contracts. Brian served as the project scheduling lead for the Sites Reservoir program, coordinating between a CPM scheduling consultant, program staff, and subject area consultants to facilitate schedule updates and management. Brian coordinated schedule updates, development, and risk management between 10+ consultants, project staff, and key stakeholders for a schedule spanning 10 years. Additionally, Brian managed the Project Controls team internal schedule to facilitate contract compliance and deliverable completion for project business and controls.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

Brian McCauley, PE

RELEVANT EXPERIENCE
Lancaster MHP Arsenic Tre;ian,,ent, U-iiversity Enterprises, Inc I Lancaster, CA Project Manager. Brian is currently coordinating the design, permitting, and funding assistance efforts for an arsenic treatment system for the Lancaster Mobile Home Park. Products of these efforts will ultimately be submitted to the State Water Resources Control Board Division of Financial Assistance as part of a Proposition 1 Technical Assistance funding application.
off Reptacei,nt,,nt (3atifornia Arneric:an Waller 0,,:�t-,np,,,u'iy I Various CA Staff Engineer. Brian utilized planning documents, capital improvement drawings, and site experience to compile water system assets and provide an opinion of replacement cost for several water systems throughout California.

The opinion of replacement cost was used to supplement testimony for the California Public Utilities Commission to justify water system purchase costs.
2020 Urban Wait,,.,r Mana�n,rnent P[an 1; Davis, C"A
Staff Engineer. Brian assisted in developing the 2020 Urban Water Management Plan for the City of Davis. He was tasked with updating and planning efforts related to the City's water supplies. Brian conducted a water supply reliability assessment and updated the City's water shortage contingency plan.

V,o,�aer Master Plan, Rsk u­,�d Resiik,�,,nce Ass�essir�.nent, D-rte.-genc"y ReI-pc,�,nse Pian, and Urban, Wate,,­- Managennent P[al-," I Anfloch, CA
Staff Engineer. Brian led the efforts to perform a Risk and Resilience Assessment and prepare an Emergency Response Plan for the City of Antioch. He coordinated and collected information from various planning documents to develop an assessment of the City's assets and the risks and vulnerabilities associated. Brian's work and experience was utilized to develop the City's Water System Master Plan and ultimately the Urban Water Master Plan.

Risk jai d Resi[i.,,nce Assessment and DTWrgl.',lncy Response P11"u,'in I Pittsbttrg, CA Staff Engineer. Brian served as a technical lead to perform a Risk and Resilience Assessment and prepare an Emergency Response Plan for the City of Pittsburg. He coordinated and collected information from various planning documents to develop an assessment of the City's assets and the risks and vulnerabilities associated. a,,--,,d ApIctica'dont Artal'A,­;ilz, TrIrlity Packbig Co,,np,,tny �� Re,,,dtey, CA Project Manager. Brian prepared a feasibility analysis for the land application of wastewater for a fruit processing facility in Reedley, CA. Brian reviewed analytical reports, operational data, environmental reports, and coordinated with the Regional Water Quality Control Board to determine the feasibility of obtaining a land application permit under current facility conditions and Regional Board regulations. Brian presented mitigation measures and alternatives to land application as part of the analysis.

SoO Acpifer Treamnent Fe,­,,,.sibiHty Study I Kactua-Kon,,,,,t, Hawaii Project Engineer. Brian designed, built, operated, and analyzed data from a column study to determine the phosphorus removal capacity of a bench scale soil aquifer treatment system. The data Brian collected will be used to the confirm design assumptions for a full-scale soil aquifer treatment system as part of a RI recycled water upgrade for the Kealakehe Wastewater Treatment Plant.

WeItl, 79 Eqt..dppk,­,g Design, Sz.,it 1 . f ro °,,,,,nto St,iburb,,,`sn Wi,-Aer Dsti­4,1 I Sacrartiento, C-,,,aifornia Staff Engineer. Brian assisted with the equipping design of a recently rehabilitated well serving the greater Sacramento, California area. The well will be equipped with a vertical turbine pump, which will be housed in a CMU building along with electrical and chlorination equipment. Additionally, the well will be adapted as an aquifer storage and recovery well during periods of surplus surface water. Brian assisted with preparing plans, specifications, and local agency coordination for the project.
h,ndt,sti,W Water Overtand Flow Syste,,nn, !P�an,,ning and Design, Fri..taJslay , Inc. 1 Rosenberg, 1­e,,X;,,S Staff Engineer. Brian developed the design criteria and conceptual design for the grading, water distribution, and collection systems for a 30-acre expansion of the overland flow treatment facilities for a potato and corn chip processor. Unique challenges of the facility included proximity to a river with extreme fluctuations in water level, high precipitation rates, stringent effluent permit limits, and changes in topography and vegetation across the site.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

ROBERT

LEPORE, GISP
Mr. Lepore is a Water Resource Planner with a focus on infrastructure master planning, hydraulic model development and analysis, and implementation of Geographic Information Systems (GIS) for public agencies. He is Geographic Information System Professional (GISP) certified by the CIS Certification Institute.

Mr. Lepore has worked for a public utility, CIS consulting firm and multiple engineering firms during his 19 year career. His project experience includes project planning and engineering for water distribution, wastewater collection and wastewater treatment systems.

Relevant Projects
Water M,-,ister I Groveir Beach,,,,(.,A
Water Resource Planner. Project consisted of a condition assessment and capacity evaluation of the City of Grover Beach water distribution system. Specific responsibilities included evaluation of existing water production, storage, and distribution facilities; creation of a GIS-based hydraulic water model, preparation of GIS-based system atlas, review of water quality requirements and goals; development of potential future requirements and evaluation of equipment alternatives; identification of deficiencies under existing and future conditions; development of Capital Improvements Program (CIP) and cost opinions for existing and future improvements.

Water Syste,,nrl, Master F11,an Update I Teh,.,,ch,.".ipi, CA Water Resource Planner. Project consisted of a condition assessment and capacity evaluation of the City of Tehachapi water distribution system. Specific responsibilities included evaluation of existing water production, storage, and distribution facilities; creation of a GIS-based hydraulic water model, preparation of GIS-based system atlas, review of water quality requirements and goals; development of potential future requirements and evaluation of equipment alternatives; identification of deficiencies under existing and future conditions; development of Capital Improvements Program (CIP) and cost opinions for existing and future improvements.

Wat-.',r Ma,_,,ter' Pu,',,n, Va,ey (,.hd1dr'en's i Ka"Kleit"qa Water Resource Planner. Completed a master plan of the on -site water distribution system to serve the planned expansion of the hospital, including the near -term expansion that will occur on the recently acquired parcels totaling 43 acres. Future development consists of an additional 760,638 square feet of hospital building area in addition to the existing 827,512 square feet. Tasks consisted of evaluation of existing water storage and distribution facilities; creation of a GIS-based hydraulic water model, identification of deficiencies under existing and future conditions; development of Capital Improvements Program (CIP) and cost opinions for existing and future improvements.
ft,,,Iue'r I GuadaU'p-'e, F"A
Project consisted of a condition assessment and capacity evaluation of the City of Guadalupe water distribution system. Specific responsibilities included evaluation of existing water production, storage, and distribution facilities; creation of a GIS- based hydraulic water model, preparation of GIS-based system atlas, review of water quality requirements and goals; development of potential future requirements and evaluation of equipment alternatives; identification of deficiencies under existing and future conditions; development of Capital Improvements Program (CIP) and cost opinions for existing and future improvements.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES ki'/

*n #
, , I IM a -
RELEVANT EXPERIENCE (CONT.)
& ,,pptemex­,tal Report to 2014 Water Mas(,er Guac­J,,,,,11u_pe, k"I"A Served as Project Engineer. In May 2014, Michael K. Nunley and Associates (MKN) completed the City of Guadalupe's Water Master Plan (WMP). The Master Plan evaluated the City's water supply, storage and pumping facilities, and distribution system, and identified Capital Improvement Projects (CIP) necessary to support City demands through buildout. A number of significant planning changes to the City's water system have occurred since the completion of the Master Plan. MKN developed a supplemental analysis and report to review these changes and identify the impacts to the scope, priority, and necessity of certain recommended CIPs from the 2014 WMP.

OiW Watt,,-,,�r System T ransmiss'= Ma0l StUdy, Casitais MWD I Qjii, CA Water Resource Planner. This project focused on updating the existing OWS hydraulic model by incorporating changes to the system since the 2018 WMP and findings from other planning studies, reviewing the impacts to the Casitas Water System based on the conversion of the Matilija Conduit to the Ojai water system, and developing preferred alternatives (including use of the Matilija Conduit) from the Ojai 12-Inch Pipeline Replacement study within the OWS hydraulic model and evaluate if those alternatives impact (eliminate/expand) the recommended improvements from the 2018 WMP. Project tasks included hydraulic modeling using the District's Innovyze InfoWater model, refinement of project alternatives, qualitative evaluation of alternatives, and development of opinion of probable construction cost for each alternative.

RUr'),,,rfl, g Ridge Zore Hydau Analys;s, Casitas MAID I Ojai, (,.,A Water Resource Planner. The District acquired the Ojai Water System in 2017 from Golden State Water Company.

This project focused on a hydraulic evaluation of the Running Ridge Zone to replace two existing storage tanks within the zone that have surpassed their useful life and are located in an area difficult to access for maintenance and replacement. Alternatives evaluated included: a new tank at a different location; upgrades to existing pump stations; new booster station(s); new pressure -regulation station(s); or a combination of these. Project tasks included an updated demand and storage evaluation, hydraulic modeling using the District's Innovyze InfoWater model, refinement of project alternatives, qualitative evaluation of alternatives, and development of opinion of probable construction cost for each alternative.

Siqriat Booster Zor­,k,,� i-1`yd,,rau,,U(,:. AraLysis, MWD 1 Ojai, CA Served as Water Resource Planner. The Casitas Municipal Water District acquired the Ojai Water System in 2017 from Golden State Water Company. This project focused on a hydraulic evaluation of the Signal Booster Zone to replace an existing storage tank and booster pump station that have surpassed their useful life. Based on the volume of the tank, small demand conditions, and low hydraulic grade of the tank, the District also experiences water quality issues. Alternatives evaluated included a new tank at the current location, a new tank at a different location, new booster station(s), or a combination of these. Project tasks included an updated demand and storage evaluation, hydraulic modeling using the District's Innovyze InfoWater model, refinement of project alternatives, qualitative evaluation of alternatives, and development of opinion of probable construction cost for each alternative. 5`1­ev-,t.­a,,',, Water Tre,,,,itment Hydra ,,E i ic Evaftiation I AMWI(", CA Water Resource Planner. Atascadero Mutual Water Company hired Michael K. Nunley & Associates, Inc. (MKN) to perform a hydraulic analysis for the future central water treatment plant (CWTP) and determine how to best integrate the facility into the existing water distribution system. In addition, AMWC requested MKN analyze and develop design criteria for a proposed pump station to convey water from the Main Zone to the Random Oaks Zone so the entire water distribution system would receive treated water from the CWTP. The Random Oaks Zone is currently supplied by Wells 8A and 13A, which would be put onto standby status.

PFOA/PFOS Compiiance Support I Atascad(,,,tro, CA
Served as Water Resource Planner. Atascadero Mutual Water Company hired MKN to review PFOS/PFOA monitoring data for the AMWC production wells, develop a blending strategy with the goal of keeping PFOS/PFOA concentrations below reporting levels, and perform hydraulic analysis to evaluate well operating scenarios to determine the ability of the existing system to meet peak demands and possible hydraulic constraints which could inhibit blending.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

KATHLEEN

HONG, PE
Kathleen Hong has 8 years of experience in the water/wastewater civil engineering field. Her experience includes planning and design of potable water, sewer, and recycled water facilities within California. Her planning experience includes conducting hydraulic analyses for water, recycled water, and sewer projects where she uses hydraulic modeling software to build models, run simulations and summarize the results in a report. Her design experience includes various pipeline, pump station, and reservoir design where she has prepared plans, specifications, cost -estimates, and provide construction support.

Relevant Projects
Stz,ote ftater .ran..,or-,krect M(:A0Jrq I City of Vt;,,,,ratira, CA Serving as a project engineer and is responsible for conducting a hydraulic analysis to review various scenarios and summarizing the results in a technical memorandum for the new seven -mile State Water Project Interconnection 30-inch pipeline between the City of Ventura and Calleguas Municipal Water District. The pipeline allows for additional water supplies for the City as it will be able to deliver the City's allocated State Water of 10,000 acre-feet per year. The project includes updating the City's water hydraulic model to be consistent with the State Water Project. Results are summarized in a technical memorandum.

M, ste. Pks-�,,,n, Sbu!dies ai­.,d 4�iydratiiic Modeii..'r-q Custa Mes,,,,w, ar-,id Nle,,e4port Be,:ich, CA
Served as a project engineer and was responsible for providing Master Plan updates by running hydraulic analyses and authoring reports, fire flow analysis, and updating the hydraulic model per Mesa Water District's system updates. Project including working with Mesa Water District to provide hydraulic modeling services, including Master Plan updates for proposed developments within the Mesa Water District distribution system. Contract includes successfully completing and delivering results for the Master Plan Updates. Analyses includes land areas up to 9 acres, developments with 250 attached units, and developments with 177 detached units. Other hydraulic modeling services for Mesa Water District include on -call fire flow analysis to determine system reliability, system operational adjustments, and continuous hydraulic model updates, per Mesa Water's direction.

Tt,,stin 11_,,,,,ga,,,.,y Specill".ic Area Master Pian t)pdate I T,..,,st, CA Served as a project engineer and was responsible for completing a domestic water, wastewater, and recycled water hydraulic analysis and summarizing results in a technical memorandum for the proposed development known as Neighborhood D-South in Planning Area 13-14 (PA 13-14) of Tustin Legacy. PA 13-14 is a 124-acre area that contains an existing 21-acre, 533 dwelling unit high density residential neighborhood with the remaining 103-acres being undeveloped, where Neighborhood D-South will be located. The area includes senior housing, single family home/townhomes, apartments, hotels, offices, and parks. The project included calculating the domestic water, recycled water demands, and wastewater generation of the proposed developments and modifying the existing hydraulic modeling, using Innovyze's Infowater and InfoSewer, to include the proposed improvements and review the impacts to the Irvine Ranch Water District's system in the area. The analysis included determining whether the water system pressure and pipeline velocities are within the District's operating criteria under peak hour conditions and maximum day demand plus fire flow conditions. Similarly, the recycled water system was also analyzed to determine if the recycled water system pressure and pipeline velocities under various conditions and abide to the District's operating criteria. The sewer system was analyzed to observe sewer pipeline depths and velocities due to the proposed system. Verifications and recommendations were made based on the analysis to provide the District a better understanding of the effects the proposed improvements will have on the system. A technical memorandum summarized the results and was presented as a Sub Area Master Plan Update.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkos

JOSEPH

REICHMUTH, GISP

PIPELINES
Joseph J. Reichmuth is a Principal Engineer with over 20 years of design experience as a project engineer specializing in wastewater treatment facilities, lift stations, pipelines, and water facilities and performing construction management services.

Mr. Reichmuth also has nearly a decade of experience working in the geotechnical engineering discipline specializing in field engineering and construction observation.

Relevant Projects
1n1,e.,,­cor,,,nection Fac�bty 1 ,,
Project Engineer. Performed design services for an interconnection facility to connect the Crestview Mutual Water Company (Crestview) with Calleguas Mutual Water District (Calleguas). This connection will provide Calleguas with an emergency source of water during outages of imported water from other sources.

The interconnection facility consist of a subsurface vault with a flow meter, pressure reducing/sustaining valve, and associated piping. The vault is connected to Crestview's water distribution system and Calleguas' Springville Reservoir via 650 feet of 12-inch CML&C welded steel pipe.

Hi�gllrqand Waterbne I San,, Uus Obispo, CA
Project Engineer. Performed preliminary design services for replacement of 165 feet the City's 24-inch water transmission line located within Highland Drive. This section of transmission main travels under a creek culvert system and railroad bridge. Due to the site constraints mentioned this section of pipe was not included in a 1995 project that replaced remaining portions of the transmission main. MKN analyzed four potential replacement alignments and has identified the alternative that minimizes construction complexities and provides the City with access for future maintenance activities. MKN is currently working on development of construction documents for the replacement project.

FoWllh,ill PR V Va,,at 1 San Lk,is Obispo, (],A
Project Engineer. Performed design and production of construction documents to replace and relocate a 16 inch pressure reducing valve. An 8 inch low flow bypass was incorporated into the design to improve system performance.

Branch Street Water[ine Niporn* CSD � Mporno, CA
Project Engineer. Project consists of abandoning an aged 6-inch waterline and installation of approximately 400 linear feet of new 8 inch waterline, reconnecting water services and installation of a new fire hydrant. MKN developed project alternatives, provided recommendations to the District, produced plans and specifications for public bid and an opinion of construction cost.

Go(den 1-i0A/MerryhiU, Storage aink Rehabilitation 1 Pazso Rob�es, CA Project Engineer. Project involved rehabilitation and seismic improvements to two City water storage tanks. Improvements to Goldenhill Tank (4 MG) included repair and replacement of roof structural members, and associated recoating.

Improvements to Merryhill reservoir included new inlet/outlet piping, design of new perimeter ringwall foundation and seismic anchors, repair and replacement of tank shell penetrations, and recoating of all internal and external tank surfaces.

Heigra,-,,;, Waterlhne Uipgrade I Pi­,�­no Beach, CA
Project Engineer. Responsible for design of main water lines to consolidate pressure zones in the area. Design included the preparation of plans, details, specifications, and opinions of cost for the construction of over 3000-If of 12-inch PVC and 650-If of 8-inch PVC distribution main. Project also involved connection to a new booster station, replacing a pressure reducing station, reconnecting laterals, fire hydrants, and new meters.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Joseph Relchmuth, Gisp
RELEVANT EXPERIENCE (CONT.)
2019 CDBG Watertine Rq,-.,,`,acernent r Gnover Bead"T, CA Project Engineer. Project consists of abandoning 50 year old 2-inch water mains and installation of approximately 2500 linear feet of new 8 and 6 inch water mains, reconnecting water services and installation of new fire hydrants.

MKN developed pipeline alignment alternatives, produced plans and specifications for public bid and an opinion of construction cost.
2020 CE)BG Watertii'�,e Replacern,,ent � Grover Beach, CA Project Engineer. Project consists of abandoning 50 year old 2-inch water mains and installation of approximately 4800 linear feet of new 8 and 6 inch water mains, reconnecting water services and installation of new fire hydrants.

MKN developed pipeline alignment alternatives, produced plans and specifications for public bid and an opinion of construction cost.
l-W,tister Avterm ue \M­,,terhne Replacern,,en�t I PI rc.'Bea ,,,'J'­,, CA Project Engineer. Responsibilities included the preparation of plans, details, specifications, and opinions of cost for the construction of 350-If of 8-inch PVC distribution main. Project also involved reconnecting laterals, fire hydrants, and new meters.

Fz,irview WO( C,,.,Olftegua.s Municipal Water DisUnct I VenU-ira (,','c�,'unity, CA Project Manager. Project to rehabilitate an inactive Aquifer Storage and Recovery (ASR) well and return it to service as a backup groundwater production well. Project includes video and biological inspection of the well, followed by preparation of plans and specifications for redevelopment of the well and system upgrades. System upgrades consist of installation of a new pump and motor, new motor control center including variable frequency drive, programmable logic controller, provisions for backup generation, replacement of piping and associated appurtenances, and addition of a disinfection system.

N�,porno Wzfter[Jn�,'., �nterde Project, Nipo,­'­c,,, CSD �� N'kpor o, CA Project Engineer. Responsible for coordination and management of subconsultants (HDD, Environmental/Permits, Geotechnical, and property acquisition). Responsibilities also included the preparation of plans, details, specifications, and opinions of cost for construction.

Interfie Pipeiinf,',,-� 1 Niportio, """A ),gnazzirii Weil Performed construction management for new 8 inch PVC transmission pipeline to convey well water to City distribution system.

Swk.,,r Spring Pipt,,,,_kne Construct i crizn Seniices �� a de Rob�es, CA Project Engineer/Construction Observer. Project to capture spring water that erupted in the City Hall parking lot as a result of the San Simeon Earthquake. Provide construction management and construction observation for collection system, pipeline, and leach field to transport thermal spring water to the Salinas River.

N,,,-'r,race F-h(I and Wasi",,,,water Tank Rh,tbilltaldcns I San Obispo, CA Project Engineer. The City retained MKN to develop construction documents for recoating and repair of two steel water storage tanks. Additionally, MKN developed seismic improvements of the Terrace Hill Tank, revisions to the inlet/outlet piping, and passive mixing systems to address water age and improve turnover of the tank. The seismic improvements included construction documents for a new ringwall footing and anchorage, as well as installation of flexible connections. Based on the anticipated cost of the necessary repairs, MKN assisted the City in evaluating alternatives for abandoning the Terrace Hill Tank. Ultimately, MKN designed a new 16-inch waterline and PRV connection to allow for removal of the tank while maintaining service to the Terrace Hill Zone.

DJ R,?,rrns Water, Storage T,',',,nk and WetI Gt,,�adatt_pe, CA Project Engineer. Design and construction of a new 750,000 gallon welded steel tank and 1,000 gpm well to serve a new development in the City of Guadalupe. Also provided construction phase service for the City.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR i ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkn

A
ADAM

BUGGIE-ISKI,

PIPELINES
Adam Bugielski is experienced with water and wastewater system design, system hydraulic modeling and management, large diameter pipeline design, and is a strong project manager. He has a strong understanding of agencies and municipalities needs and has worked closely with many in the region. Mr. Bugielski is also experienced with water and wastewater infrastructure reviews to determine possible deficiencies and identify capital improvement needs, as well as opportunities to optimize existing infrastructure to achieve the project goal as quickly and efficiently as possible.

Relevant Projects
Z
Project consists of planning, design, and construction of a new booster pump station, pipelines and breakpoint chlorination storage and injection facilities.

Prepared process and mechanical design for breakpoint and free chlorine storage and injection facilities with construction plans and specifications.

Served as the project manager for developing a new wastewater master plan for the City of Ventura. Full master plan included evaluation of 300 miles of pipeline 14 lift stations, and a treatment facility. Included in the master plan was a condition assessment, hydraulic model development, capacity/deficiency analysis, and development of the recommended CIP.

Project consisted of designing a thrust restraint for a 40-inch diameter pipeline with working pressure over 100 psi. The thrust restrain was required due to the inability to shut down the pipeline and the need to a valve to be installed resulting in a "line stop" and bypass.

Project consisted of developing a new water master plan for the City of Ventura.

Full master plan included evaluation of 380 miles of pipeline 21 pump stations, 32 number of tanks, 10 number of wells, and 3 treatment facilities. Included in the master plan was a condition assessment, hydraulic model development, capacity/ deficiency analysis, and development of the recommended CIP.

This project for City of Ventura assess 5 sewerline projects identified in the City's 2018-2024 Capital Improvement Plan (CIP). Reviewed and updated hydraulic model components through record drawing review, recommend sewerline survey and connectivity inspection at chosen locations. Reviewed the model to evaluate deficiencies for the flow scenarios and determined multiple alternatives to mitigate the deficiencies. Projects include sewer analysis of 7 miles of pipeline around the Midtown and Harbor area of the City with pipes ranging from 6-inch to 36-inch.

This project consists of replacing 5,000 feet of deficient 10 to 12 diameter sewer pipe with 15 and 18 inch pipe. Different alternatives were analyzed to reduce cost and improve efficiency of the overall City collection system. Project involves coordination with California Department of Transportation (Caltrans) as the project conflicts with two major on/off ramps for the US-101 freeway.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

RELEVANT EXPERIENCE (CONT.)
t,
'"5
This project consists of replacing 520 feet of structurally deficient 15 diameter sewer pipe within existing public right-of-way. Due to the severe structural deficiencies, this project was deemed an emergency and the design was expedited. Offered design support and served as the Construction Project Manager. Challenges faced in construction were unknown/unmarked utilities and remediating significant amounts of previously unknown non -hazardous contaminated soil.

J
Reviewed and evaluated the Ojai Water System for Casitas MWD. Analyzed capacity and fire flow throughout the system and recommended capital improvement projects to the District to meet requirements and utilize existing infrastructure in order to maximize available funding.

Assisted the Team in preliminary design effort for Signal Tank and Booster Pump Station Replacement including the siting study to connect the signal zone to the main zone to better serve the mountain view area. Completed siting study, preliminary cost opinion and basis of design memorandum.

Project consisted of conducting pump tests to determine energy deficiencies of two pairs of existing, aged vertical turbine and horizontal axial split -case pumps that exhibited unusually low pumping efficiency. Performed hydraulic analysis, developed new system curves, identified several viable alternatives, and provided a recommendation that all four pumps should be replaced.

A Project efforts included providing slope stabilization solutions to the District for their Heidelberger Tank and Heidelberger Booster Pump Station sites. Conducted site visits, managed geotechnical teams' analysis and provided District with solutions. Designed plans and specifications for slope stabilization solutions at the Heidelberger Tank site.
y uH
Served as the project manager for several high -profile projects that made up the VenturaWaterPure program, a potable reuse project. Projects managed included feasibility study and design of a 14-inch ocean outfall and pump station, a 6-million-gallon storage tank, an advanced water purification facility, and injection wells. As part of this program, a feasibility study of replacing the existing traditional activated sludge water reclamation facility with a membrane bioreactor.
—A
Project manager for the planning and design of an arsenic removal treatment system for the School. The project is receiving Prop 1 grant funding, and MKN's work to date has included conducting a preliminary engineering evaluation of the various project alternatives and preparation of preliminary design plans. Design included arsenic treatment vessel, booster pump station design, and piping modifications.

This project consists of a site condition assessment and replacing the electrical cabinet, MCC and PLC, and installing safety measures such as vehicular guard rail, handrails, and bollards. Discharge piping configuration was also evaluated and a new magnetic flow meter was designed,
This analysis consisted of hydraulically modeling the water system for the City of Ventura to evaluate the potential impacts when delivering water to Casitas Municipal Water District. The analysis was done at multiple connection points for optimum efficiency and summarized in a memorandum to Casitas MWD. Potential sites for booster pump stations to transport water from Ventura to Casitas were also identified.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR tt
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mklia

Parasto Azami brings over 10 years of experience in water and wastewater engineering design delivering designs in the areas of gravity sewer, force main, water conveyance system, pump station, rehabilitation, and condition assessment.

Her experience includes multiple, complex large pipeline design projects.

Relevant Projects
Design Lead for replacement of an existing potable water line located within private easements and transferring costumer services to new pipeline. Task included both preliminary, Final design and construction phase support.

Design Lead for design of new 8 -inch raw waterline, with over 100 feet of trenchless/ tunneling pipe. Task included identifying optimum alignment, coordinating with utility and jurisdiction agencies, preparing plans, Specification, cost estimate and construction schedule.

Design Lead for preliminary and final design of 4,000 feet of new 12-inch waterlines and three pressure reducing facilities. Major tasks included alternative analysis, utilities research, and development of a plan and profile, coordination with County for Traffic and pavement replacement requirements.
.... . ...

Design Lead for design of approximately 1,500 feet of new 12-inch water main in the vicinity of the Laguna Cliffs Marriott in the City of Dana Point.

B'? r CA
Project Engineer for design for two new 100K gallon steel reservoirs located within a hillside in Laguna Beach. The effort included environmental permitting, public outreach, access road improvements, site grading, retaining walls and demolition of one existing steel tank.

Project Engineer for design over 2 a new 8-inch waterline to provide fire service water for magnet high school new lab. This project included installing new pipeline adjacent to a residential property and near School, making community impacts and traffic control a critical design consideration. Task included both preliminary and Final design.
. .. . . . . ",
Design Lead for final design for two emergency potable water interconnects between the City of Thousand Oaks and American Water. The interconnects include control valves, pressure relief valve, drain connections, meter, below grade vaults and associated appurtenances. As part of project, evaluated multiple locations and alignments, coordinated with both agencies to obtain design requirements, and coordinated with surveying and pot -holing subconsultants.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

RELEVANT EXPERIENCE (CONT.)
d Design Lead for final design of two pressure reducing facilities. Major tasks included hydraulic analysis, utilities research, and development of a preliminary and final design for a new pressure -reducing station to offset the need for alternative capital improvement projects.
n
Design Engineer for design of over 11 miles of 48-inch Force main and 30-inch Brine line to convey sewer from Morena pump station to North City Pure Water Facility and producing 15 MGD of purified drinking water. Major tasks included hydraulic analysis, steel pipe calculations (AWWA M-11), construction plans and Specifications, and pressure reducing facility (PRV).

Design Engineer for rehabilitation (CIPP) and replacement of 16 miles of sewer pipes and over 200 manholes to extend sewer system s reliable life by 50 years. Tasks included preliminary and final design, technical reports, bypass plans, construction schedule, cost estimate and specifications. Work also included coordination and attending progress review meetings with client, utility agencies and sub -contractors.

Project Engineer for the expedited alternatives analysis and design of 2,400 LF pipelines for WRD's future Regional Brackish Water Reclamation Facility. Project included evaluation of six alternative alignments, including both trenchless and open cut approaches, and final design. The project includes preliminary and final design of a 14-inch HDPE brine line, two 24-inch HDPE product water lines, and a 34-inch HDPE source water line. h
Design lead for cured -in -place (CIPP) rehabilitation of 20-inch drain line. Tasks include reviewing CCTV, developing plan & profile, civil details, specifications, and cost estimate. Construction phase tasks included reviewing bid documents, submittals, and RFI's.

Design Engineer for the design of over one mile 10-inch sewer line to provide sewer service for new senior center and library. Tasks included preparing preliminary and final design report, alternative analysis, developing plan & profile, and civil details. Conducted utility research, hydraulic calculations.

V,
Project Engineer for design over 2 miles 30-inch domestic transmission water line, 10-inch sewer line, 16-inch recycled water lines and over 200 feet of trenchless/ tunneling pipe for new developments along Portola pkwy.

Project engineer for preliminary design of replacement of existing water reservoirs to meet the emergency fire demand. Major tasks include hydraulic analysis, reservoirs siting evaluation, constraint analysis, environmental and geotechnical evaluation. Prepared technical memos, construction schedule and cost estimate. a nr,
Project Engineer for the design of a pump station replacement. Project included preliminary and final design for the replacement of an existing pump station. The new pump station consisted of a 1500 gpm package pumping system, associated piping, controls and valves. The construction included a temporary pumping system to allow for continued operation during construction and replacement of an elevated electrical transformer (SCE). 2,,,nd
Project Engineer for design of 2 miles of new 48-inch water line and a pressure reducing facility. Designed PRV, conducted hydraulic calculations and steel pipe welding size, coordinated with vendors to obtain PRV sizing and requirements.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR 11
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

KEVIN
ZtALEH, PE
Mr. Saleh has over two decades of experience as a civil engineer. His lDrofessionalexr erienceincludes, lannin desi�,n construction mana em and treatment plant projects and processes.

Relevant Projects
Den-sdr­t` Hi[L Wa,er Trf,atrnent Pkaru Clvqca[ SystetT,, Rehabkiltatle, Watu,sr Authm'iity, CA
Civil engineer providing design and construction support services for the Cement Hill Water Treatment Plant, Chemical System Project. The project will convert the plant disinfection system from chlorine gas to sodium hypochlorite. Both on -site generation of low strength hypochlorite generation and medium strength (12.5%) bulk deliveries will be evaluated. The bulk hypochlorite system will likely consist of two 12,000-gallon hypochlorite storage tanks and multiple hypochlorite metering pumps for dosing at the various raw water and residual dosing locations. The project also includes replacement and reconfiguration of the plant filter aid and coagulant dosing systems as well as replacement of all chemical piping between the metering pumps and dosing locations. This project is currently in construction.

Cak-k,nrn Thios�',_Alfiate Chemicat Feed Systei,'n Prcj,,,-�ct I Union Sanitw'y District, CA Civil engineer who provided construction support services for the project to replace an existing calcium thiosulfate storage and metering facility with a new fully functional de -chlorination facility to handle higher and more frequent plant discharges to an emergency outlet. The project included new chemical metering pumps, storage tank, piping, electrical, and instrumentation for the new de -chlorination facility. The project also included conducting a pump evaluation to determine the best available chemical metering pump type for this application.

Weu PFAS Design artd Ste L,,,:iyou,, Santa Va['key
`ate al'U,!r, Agen,,,,:-y I Los, Angetes Cotn','ty, CA
Project Manager for Preliminary Design Report and site layout for PFAS treatment (using IX system) of 950gpm discharge flow of Honby Well and chloramination system layout including sizing of on -site Sodium Hypochlorite generation, Brine, Sodium Hypochlorite, and Liquid Ammonium Sulfate (LAS) tanks and calculation of required dosing of chlorine and Ammonia.

S ft (,s PFAST."'eatrnient Preliminary Design and Site Layw,a, Sane".i eta it Vaitey Wat,,'nr Agency I L,os Angetes Co,,',�nty, CA
Project Manager for Preliminary Design Report and site layout for PFAS treatment of 7,000gpm discharge flow of S6 to S9 Wells (using IX system) and chloramination system layout including sizing of on -site Sodium Hypochlorite generation, Brine, Sodium Hypochlorite, and Liquid Ammonium Sulfate (LAS) tanks and calculation of required dosing of chlorine and Ammonia located in S9 Well site. , Gt­o�.,,.,n,,d Wwtei­ Recovery PU.init City of &­n Ji'an I 0'­anqe CA Project Engineer responsible for the design, permitting, and construction support for expanding Groundwater Recovery Plant (GRWP) from 5.Omgd to 7.7mgd. The expansion project upgraded the Reverse Osmosis (RO) plant, including new chemical storage and feed systems, converting from potassium permanganate to sodium permanganate in the Greensand filters and changing the media in Greensand filters, adding additional capacity to the RO filters by increasing the flux rate and new filter cartridges, additional finished water storage, chlorine disinfection as the primary

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Kevin Sateh, PE
RELEVANT EXPERIENCE (CONT.)
disinfectant prior to finished water storage, and aqua ammonia as secondary disinfection prior to distribution.

Prop 50 W01s ,ind IX Trealunt",ent systern, City c,,f C,,,gnroi I Rivet,,,s,;k,!e Cowray, CA Project engineer responsible for the design of resin treatment of Nitrate sources including Hydraulic Profile, sizing Ion Exchange vessels.

Grandview Purnp Statk:,,n's P,,,,-,mp 4 City cd G�.enda[r_!, CA Project Manager responsible for design and preparation of bid documents for the replacement of the facility's Pump No. 4 with a capacity of 6,000 gpm at 290-ft TDH.

Dov,vraown An,­iheinn Recy,,":-tecl Water Design Bt,Okl Project I Orange Counay, CA Project Manager responsible for design for the design -build effort in conjunction with Arnaz Engineering for a new pump and tank system to replace the existing irrigation pump supply system. the new system is designed to store (on -site) recycled water generated in WRDF and irrigates the Pearson Park. The new 75,000 gallon tank and pumping system is connected to the park's irrigation system.

Meridian Lift Statior,, RepUice,n­,,ent I San Bernadkirw Mk,�niciptit Water District, CA Project Manager for this lift station replacement project. The Meridian Sewer Lift Station was installed 38 years ago, in 1983, and is in relatively poor condition as most components have exceeded their normal life expectancy of 15-20 years. In addition, the sewer lift station has a limited storage capacity to provide adequate response time to address potential station operational issues. It does not have a backup power supply and relies on an antiquated auto -dialer system to notify staff of critical alarm conditions. LEE + RO is providing engineering services for project design, preparation of contract documents, and providing bidding support and engineering support during construction (ESDC) of the new sewer lift station. The replacement sewer lift station includes a new wet well and conversion of the existing wet well to emergency storage, new submersible pumps, new electrical services and power distribution system instrumentation, controls and SCADA system, and a new CMU building housing the electrical equipment.

In lieu of an emergency standby diesel generator, SMMWD opted to use a battery energy storage system for back- up power supply during an electrical power outage and for peak shaving to lower their energy costs. Kevin was responsible researching the various battery suppliers, sizing the battery system and making recommendations for SBMWD's pre -selection of the battery supplier. Kevin also assisted SBMWD with applications for available incentives through the Self -Generation Incentive Program (SGIP).
grou,n.d,­.,; St, aDexter, Dr% Waste wav­,,,,Lift Reps sue. ennera P,,,­,,,.,�ject, I Cittrof Rivers,,,.­Jlbe, CA Project Manager for this project, which includes the replacement of two lift stations. The Fairgrounds Wastewater Lift Station was constructed in 1966 and it is currently equipped with two 5-hp Fairbanks Morse 230-volt three-phase motors. The Dexter Wastewater Lift Station was built in 1968. The existing Vaughan vertical chopper pumps were installed in the early 1990s, replacing the vertical non -clog pumps. The Vaughan chopper pumps are rated for 170 gpm at 20 TDH. The City desires to replace both existing lift stations with new lift stations conforming to the City's Sewage Lift Station and Force Main guidelines. LEE+RO is preparing construction documents for the replacement of two existing wastewater pump stations.

Pierce Street Sewer P�jmp Statioiri Conditiot-A, Ttent City of Riverside, CA Project Manager for The Pierce Street Pump Station. The Pierce Pump Station is the largest wastewater lift station in the City of Riverside and handles an average of 4.5 MGD. The condition assessment for the Pierce Street Sewer Pump Station to address the operational challenges the pump station is experiencing, including non -operational valves, leakage from the wet well into the dry well, and aging mechanical equipment, and outdated electrical components.

Wood Road Sewer Punnp Station Assessirnera I City ,,-., CA Project Manager for this Sewer Pump Station Assessment. The City of Riverside, Public Works Department (City), is currently experiencing operational challenges at the Wood Road sewer pump station. Some of the issues are heavy ragging, extended ramp -up time of the VFDs, pumps not operating at the recommended efficiency level, and most recently, failure of the ultrasonic sensors. As Project Manager Kevin is leading a team assess the current conditions of the Wood Road pump station and recommend modifications to the current operations and programming of the station. The desired outcome is to reduce the ragging problem, to have the pumps working at their recommended efficiency level, and to resolve any major flaws discovered during the assessment process.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mk.,

JOSH

NORD, PE
Mr. Nord is experienced in wastewater collection system condition assessment, analysis, modeling, and design. Mr. Nord has nearly 20 years of industry experience including design, analysis, and management of municipal projects throughout California, and internationally. Mr. Nord has served as Project Manager for multiple On -Call engineering contracts and has served as District Engineer for a Community Services District for nearly 15 years. Mr. Nord previously served as the Assistant Managing Engineer for a Fortune 500 engineering company. ,",Ur' ""' " I P, elope
P ""0 "t-V tl y
CA
Project Engineer. Work consisted of the preparation plans, specifications, and estimates for the design of a nominal 4,500 gpm pump station (four vertical turbine units — 3 future) including metering and discharge piping and appurtenances. The facility takes water from the Pool 42 of the California Aqueduct. 2 CA
Project Engineer. Work included design of a 2,250 gpm booster pump station (including a pump building and chemical feed appurtenances), a 428,000 gallon bolted steel tank, and ductile iron and steel piping and appurtenances to tie the treatment system from the Phase 1 Project into the reservoir and booster pump station.
e:," 1,i`­,,hh,:,,,r, I BakersiftOd, CA
Project Manager Lead Designer. The pump station includes a nominal flow of 5,700 gpm at a Total Dynamic Head of approximately 170 feet provided by four identical 100 hp constant speed can -mounted vertical turbine pumping units, including one standby unit. The pump station replaces a 60-year old facility. The pump station is a key facility in the District's infrastructure that distributes flows from the District's groundwater wells to the higher elevation areas of the District.

Facilities at the station include an air chamber for surge control, discharge piping and appurtenances, and connection to the Kern Citrus Tank.

R
Project Manager/ Lead Designer. Project will be constructed in East Niles Community Services District to serve the G.L. Bruno medical campus which would be the first point of service in ENCSD's 900 zone. The pump station design includes three present (1 future) nominal 750 gpm 30 hp constant speed vertical turbine can - mounted pumping units. The design also included a hydropneurnatic tank for pressure regulation, discharge piping and appurtenances, a block building, and a standby generator.
'ifornia Ca� 0, "",o
Existing Cross Valley Project conveys water from the California Aqueduct to metropolitan Bakersfield through a 17-mile long concrete lined canal with six intermediate low -head pump plants. The expansion project work included designing six parallel pumping plants (500 cfs capacity — 224,000 gpm) as well as a raised liner (1 to 1.5 feet) to accommodate the increase in system capacity from 922 cfs to 1422 cfs. The work included modeling of the canal section using HEC- RAS as well as preliminary modeling of surge events in the canal using Root Canal.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Josh Nord, PE
RELEVANT EXPERIENCE (CONT.)
. . . . . . .. . A Dcl,""t"� ZIM"Ld CA
Design Engineer. Pump station includes four 14 cfs (800 hp) variable frequency drive equipped can -mounted pumping units, including one standby unit. Pump station has a design flowrate of 70 cfs at a total dynamic head of 204 feet. Facilities include a 3,200 cubic foot air chamber for surge ontrol as well as a 12-foot diameter partially - buried standpipe for surge control upstream of the pumps. . . .. ... .

CA Bi f'
Design Engineer. Pump station includes four 600 hp variable frequency drive equipped can -mounted pumping units (3 duty — 1 standby) at the North Pump Station and one 500 hp wet -well mounted unit for the East Pump Station. The Total dynamic head of the two respective systems ranges between of 308 and 445 feet. Facilities include two air chambers (300 and 250 cubic feet respectively), modifications to existing air chambers, and pump station piping reconfiguration. Staging of construction was carefully detailed to minimize impacts to the existing systems. s 11, L d, CA
Design Engineer. Predesign efforts included analysis of hydraulic impacts resulting from expanded flows and analysis of potential for hydraulic transients. Design included adding pumps, appurtenances, electrical, and controls to bring the pump station to the design build -out condition. At build -out the pump station includes four 1000-gpm constant speed can -mounted pumping units (3 duty — 1 standby). Design included modifications to the existing air chambers. Staging of construction was carefully detailed to minimize impacts to the existing systems.

UT
'C
Project engineer for preparation of system hydraulic calculations and pump selection for the 15000 south pump station bi-directional inline booster pump station.

Project engineer for preparation of preliminary system hydraulics and surge analyses, as well as preliminary design of surge control facilities.
1 North Dakota
Project Engineer for the preparation of system hydraulics, surge analyses, and final design of two 300 cfs pump stations and appurtenances as part of the Devils Lake Emergency Outlet Project. Both pump stations have a first phase capacity of 100 cfs at 160 feet of total dynamic head. The Round Lake Pump Station includes dual 54-inch diameter, 400 foot long, HDPE suction pipeline with a screened intake and vacuum priming. The pump station designs include four can -mounted vertical turbine pumps (2 at 50 cfs and 2 future at 100 cfs), removable suction pipelines (with raisable intake screens), a canal intake, 84-inch suction piping, fixed head standpipes for head control (40-foot diameter and 70 to 90 feet tall), 30-inch steel discharge piping and appurtenances, and recirculating bypass piping and valving. Design included mitigation measures to avoid impacting wetlands and had to account for deep freeze conditions.
'nHULU, L,,4­1
Project Manager for the preparation of construction plans, technical specifications, and contract documents for the project. The design includes 1,400 I.f.+- of 12-inch PVC distribution pipeline with isolation valves, air -release, and hydrants. The pipeline was required to be relocated as a result of the overlying road being realigned/re-graded.

CA
Project Manager for the environmental document preparation and preparation of the plans, specifications, and estimates for the project. The design includes a 20-inch CML&C steel pipeline between the Morning Drive Tank Site and Pump Station and the Freeway Tank Site (future pump station site). This transmission main is a key connection point (planned to be installed since mid-1980's) to move flows from the surface water supply connection point into the lower zones of the District.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES ki%

SARAH
MATHEWS, PEz r1so

PUMP STATIONS
Sarah Mathews is experienced with water and wastewater infrastructure and is a strong project manager. She has over 10 years of experience in design and project management of water and wastewater facilities. Sarah was awarded Young Professional of the Year by the Ventura County APWA and is currently their Membership Committee Co -Chair. Sarah was also named one of Autodesk Construction Solutions' "40 Under 40: Champions of Construction 2021." Relevant Projects
Project Engineer. Project consists of preparation of a preliminary design report, design, and construction documents for a 3 million gallon partially buried prestressed concrete reservoir, booster pump station (consisting of three vertical turbine pumps), and associated improvements. The reservoir includes a recreational area on the roof to preserve the intended recreational use of the site.

Project includes coordination with local agencies (including Los Angeles County Flood Control District), regulatory agencies (Department of Drinking Water), etc.

Project Engineer. Project consists of site assessments of the District's above- ground facilities, including potable, non -potable, and wastewater sites. These included assessments of existing pump stations, reservoirs, lift stations, treatment facilities, and wells. Prepared technical memoranda summarizing site conditions and recommended improvements for near -team Capital Improvement Project development.

Project Engineer. Project consists of preparation of a technical memorandum that analyzes an existing potable water transmission main as part of proposed improvements to existing well sites. Working included hydraulic analysis of the existing pipeline to verify the hydraulic capacity to determine the feasibility of routing additional flow through the pipeline without exceeding the pipeline's existing pressure ratings.

Project Engineer. Project consists of preparation of construction documents for the replacement of two horizontal centrifugal pumps at an existing potable water booster pump station, including pump selection, concrete improvements, piping modifications, electrical improvements, and related work.

Associate Engineer. Performed hydraulic calculations and participated in design of $22 million 21 CFS pump station, pressure reducing station, 6,300 LF of 30 inch diameter welded steel pipeline, and related system improvements; prepared specifications; prepared pipeline design calculations; assisted in overall coordination between 11 subconsultants; prepared addenda; reviewed bids; performed submittal review; responded to contractor requests for information, etc.

Associate Engineer. Performed hydraulic calculations and participated in design of a $4.2 million lift station and force main, analyzed anticipated wastewater production based on historical water use data from similar hotels, prepared specifications, prepared addenda, performed submittal review, responded to contractor requests for information, prepared change orders, inspected pump acceptance testing, etc.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Sarah Mathews, PE
RELEVANT EXPERIENCE (CONT.)
Associate Engineer. Prepared preliminary design report detailing potential options to increase existing wet well capacity to increase the active volume of an existing lift station, including hydraulic analysis of existing pumps and float settings to determine necessary modifications.

Project Engineer. Project consists of site assessments of the District's above -ground facilities, including potable, non -potable, and wastewater sites. These included assessments of existing pump stations, reservoirs, lift stations, treatment facilities, and wells. Prepared technical memoranda summarizing site conditions and recommended improvements for near -team Capital Improvement Project development.

Project Engineer. Project consists of design of a retrofit installation of a flow meter at an existing sewer lift station, including a new vault, piping modifications, and associated improvements. Prepared plans and specifications for the project and assisted the City in meter selection and prepurchasing.

Associate Engine er/Construction Observer. Participated in design and preparation of specifications for a three- phase waterline replacement project, prepared cost estimates, addenda, change orders, payroll review, and progress payment review; performed construction management and observation; inspected pipeline acceptance testing, etc.

Associate Engineer. Prepared detailed Preliminary Design Reports for numerous improvements to be constructed using SIZE funds, including waterline replacements, pump replacements, welded steel tank replacements, chlorination facility replacement, electrical system modifications, solar panel installation, erosion protection improvements, flood protection improvements, etc.
60 Associate Engineer. Provided value engineering and prepared detailed cost estimates spanning three phases and involving both City of Goleta and GWD costs for waterline replacements and modifications related to the realignment of several roads. Participated in design and preparation of specifications, bid analysis, etc.

Associate Engineer. Participated in design and preparation of specifications for over 8,000 LF each of sewer replacement, waterline replacement, and road rehabilitation (totaling $16.2 million); designed modifications to existing storm drain crossings to accommodate installation of sewer in a deeper alignment than existing; designed bore and jack undercrossing at existing storm drain culvert; coordinated and ran utility coordination meeting; prepared addenda; performed bid review; etc.

F­
Project Engineer. Project consists of preparation of a preliminary design report regarding the design of a metering station for discharge of treated wastewater into a salinity management pipeline, including but not limited to a new vault, meter, pipeline improvements, and electrical improvements. Project included preliminary design of the improvements, cost estimation, and related work.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mklia

Mr. Brennan, brings over 30 years of experience providing construction management and project management in the water resources industry. He worked for over 22 years with the Los Angeles County Sanitation Districts where he administered construction contracts ranging from $1M to $190M. In this position, he served as a Project Manager/Senior Resident Engineer for various projects such as wastewater treatment plants, pipelines, pump stations, and landfill construction. He also worked for the City of Los Angeles with the Los Angeles World Airports -Airports Development Group where he was responsible for multiple aspects of project/ construction management for airport infrastructure renovation and expansion.

PETER

BRENNAN, PE, CCM

CONSTRUCTABILITY &
COST ESTIMATING Relevant Projects
Ei Estero Wastew,"a.,ter I eaUtn,.ent Plain t'Terfi,,.,ry Filmr RE,-p�ace,nent I Barbara, CA Construction Manager. This $8.4M project replaced the treatment plant's existing filtration system with a microfiltration (MF)/ultrafiltration (UF) facility. Work included demolition of an existing gravity filter, installation of driven concrete piles, construction of a new MF/UF facility, new filter feed pumps, replacement of chemical feed pumps, modifications to the chlorine contact basin, modifications to the reclaimed water storage reservoir, new reclaimed water transfer pumps, yard piping modifications, associated electrical and instrumentation modifications, and other appurtenant work.

D E, tero Alastewate,,r Tdtnnenft Plant Seconda�ry I rn prove rr-kents Santa Barbara, CA
Construction Manager. This $22.6M project converts the existing conventional activated sludge process to biological denitrifi cation. These improvements will result in increased quality secondary effluent feed to the new ultrafiltration (UF) facility. Project work includes modifying the aeration basin, including new inlet and outlet gates, baffle walls, aeration diffusers, mixers, and aeration piping as well as structural modifications; replacing return -activated sludge pumps and piping; replacing two aeration process air blowers; adding new concrete flume structure to distribute mixed liquor flow to the secondary clarifiers; modifying secondary clarifier, including replacing and modifying sludge collector mechanisms; adding new mixed liquor pumps and associated piping; adding new chemical facilities (ammonium sulfate, ferric chloride, and polymer) including tanks, pumps, and injection diffusers; adding secondary effluent recycle facility including diversion box and gate; and modifying associated 480V power upgrades. (1nner's Aglent/Owner's Eng�neer S�,,,,,,rvice�s, fi­,,,r t1he GrounciNtowter F?ebabitity ,nnqprovement .11"t,ogram WRR) Water RepU,,,­­6shment Distrk"A., of Sot.,a,tber,n, Caifornia,

W R D) CA
Construction Manager. WRD established the GRIP to find alternative sources of water to offset the imported water used for replenishment in the Montebello Forebay. As part of the GRIP, an advanced water treatment facility (AWTF) is being designed and constructed to treat 10,000 acre feet per year of tertiary recycled water. The GRIP AWTF is located in a 5.2-acre lot, adjacent to the San Gabriel River in the City of Pico Rivera. Treatment processes include automatic strainer to protect downstream membrane treatments systems from large particles; microfiltration (MF) or ultrafiltration (UF) to reduce turbidity and silt density index (SDI) of reverse osmosis (RO) feed water; cartridge filtration to project downstream of the RO process; RO to remove salts, minerals, metal ions, organic compounds, and microorganisms; advanced oxidation with utraviolet light (UV) treatment using

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Peter Brennan, PE, CCM
RELEVANT EXPERIENCE (CONT.)
hydrogen peroxide in concert with UV to reduce N-Nitroso-Dimethylamine (NDMA) concentrations and provide additional disinfection; decarbonation to release excess carbon dioxide and stabilize the product water; and pH adjustment/corrosivity stabilization. The 11,700 sf treatment facility is LEED certified with approximately 40,000 sf of additional surface landscape and bioretention, 4,000 sf of vegetated roof garden, with 79,000 sf of surface parking and pedestrian hardscape.

N t3<v T u r, n­ 0 t_,� t S t r u u, r e s a t t .tom S a ­,, G a b r ize t R i v .. 0 a a s ta, i B tit i n S ,v,reaf,-Hrig Grour,,d I Water District of Soutilthieri, Catiforr6a, CA
Construction Manager. This project constructs two new turn -out structures and associated discharge structures at the San Gabriel River Coastal Basin Spreading Grounds, which will provide needed operational flexibility for the spreading of an additional 11,000 acre-feet per year (AFY) of tertiary recycled water and 10,000 AFY of advanced treated recycled water. Additional work includes shotcrete lining of an existing approximately 6,400-linear-foot distribution channel and the installation of new 66 -inch pipelines approximately 500 linear feet along with electrical and instrumentation and control systems.

A&�,un,,,.,'ed Walter Purifhc-atioor Facilitv ar,,,,d Prot:111uV Water Punip Project [ Montet'§,,,y Ka'4er PcHh,,,Irion Contr,ad Technical Advisor. This $48M project involves the construction, testing, and startup of a 4-million-gallon-per-day (MGD) Advanced Water Purification Facility (AWPF) and pump station to treat various wastewater sources from the Peninsula and Salinas Valley for injection of approximately 3,500 acre feet per year (AFY) of purified recycled water to the Seaside Groundwater Basin. The new 22,560 -square -foot AWPF is being constructed on a 5.7-acre site within the confines of the Monterey Regional Treatment Plant (RTP) and adjacent to the operating Monterey Regional Waste Management District (MRWMD). Both facilities must be kept in full operation during construction. Access and security of vehicular traffic, construction work, and staff must be coordinated with the existing plant operations team.

In addition to access and security issues, ongoing coordination with plant operations personnel prevents potential impact to the ongoing operation of the existing wastewater treatment plant. Provided construction management, construction inspection, testing, startup, and commissioning services.

Aerated Sllh,,idge Hold'�ng 'TartA Rep[acement I Carpir­tte,,ri�.-',� Sz.,,,nitary District, CA Construction Manager. This $6M project demolished two aging aerated sludge holding tanks and constructed two new concrete digesters that meet current seismic standards, use state-of-the-art aeration equipment and computerized process control systems, enhance treatment of solids, and dramatically improve energy efficiency through the use of ultra -efficient pumps and blowers. The solid foundation comprised of 170 stone columns beneath the new tanks prevent future seismic liquefaction. To avoid major noise impacts associated with pile driving, a unique process involving a vibrating head and hollow shaft extended these densified rock columns 55 feet deep into the ground. This work required a massive 250-ton crane. These substantial structures —each approximately 50 feet by 50 feet and 20 feet deep —were outfitted with piping, equipment, and instrumentation necessary to provide maximum operational flexibility and optimized biological treatment. Additional project elements included the installation of a temporary sludge handling system and new aeration blowers; relocation of existing chemical facilities; and modifications to yard piping, electrical and instrumentation, and other appurtenant work.

A.­gd ­�,geles, Col_tntv Sanitatioo Di�,,o'Hots I Los A� , ',es Courity S.,ini„tat k:,n CA Construction Manager. CM's responsibilities included design consultation, constructability review, value engineering, plan and specification review, supervision of inspection and survey staff, quality assurance, project controls, document control, submittal and shop drawing review, RES, change management, CPM scheduling, monthly progress payments, claims management, dispute resolution and change order negotiation, start up and commissioning, and O&M manuals.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkn

Mr. Martin has 35 years of experience in advanced water treatment processes, such as reverse osmosis, ion exchange, and specialty adsorbents. He is an expert in water quality issues both in the municipal and industrial industries, with over 30 treatment plant designs and dozens of evaluations and feasibility studies. Mr. Martin has presented numerous papers at water industry conferences concerning water quality and treatment topics, and is a recognized expert in these fields.

Relevant Projects
Monte V�sta Water- District .tip l,11", 33
Project engineer for nitrate removal project. Facilities included ion exchange treatment for nitrate removal and softening, blending to allow delivery of selectable nitrate concentration to two different water systems, salt storage and brine facilities, and chemical feed systems including chlorine and ammonia feeds for chloramination.

Cap'�strano
Project engineer for design of treatment process and chemical systems, including reverse osmosis process, iron and manganese removal, storage systems, and chlorine and ammonia feed equipment for chloramination.

S,',?n'ta Paula W. Ler ReduGirnahw­t Far,:011.4y Staff ion I Santa Pa,,Aa, ""A Provided oversight and review of contract operator for the Santa Paula WRF, including preparation of capital budgets, review of expenditures and preventative maintenance programs, and staff activities.

City �',Alf (,oa0r,ga WTP Reduct'K:�-"n I (3,C)"atinga, CA Directed staff in design and preparation of construction documents for replacing temporary carbon dioxide and permanganate storage and feed systems for THM reduction at the Coalinga Water Treatment Plant.

WWTP Systern Inriprovernients I Canrlai­No, (,,A
Reviewed existing chemical storage and feed systems at the Camarillo WWTP to evaluate reliability, safety, and maintainability. In a workshop with Camarillo Staff, developed a plan to replace or upgrade the chemical systems on a schedule complying with City budgeting limitations while optimizing safety, utility, and plant performance.

Betmont Waiter Corpm"ition, Reniiovat 1, Fre,.""no, CA
Working with the Division of Drinking Water (DD), developed a pilot testing program to demonstrate the effectiveness of Point -of -Entry (POE) treatment for 1,2,3- TCP removal for a small water company. This project may lead to the first implementation of POE treatment in the area.

Ce.-ari,il Union Sclh=[ Water, Systern Arsenic Re,,,, -",-,oval, CA Provided engineering direction for design and implementation of an arsenic treatment system for the Central Union School District, including coordination with funding agencies and DDW.

Sema;.,ter Desa1,ina,,zJo,,n,, Pl;,,,nt Ernertile: en,,cy Operarbons Plan I Morro Bay, CA Project Engineer. Evaluated water quality from 5 existing wells and developed methods of treating high iron concentrations to enable operation of the Morro Bay Water Treatment Plant RO system. The project included developing process and instrumentation diagrams to capture plant modifications that have been performed over the 24 years since the plant was developed, as well as designing plant retrofits and improvements to allow for emergency operation in the future.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

RELEVANT EXPERIENCE (CONT.)
P(,,�tronas ANGS� Offsf�o.­e CEOR
Served as lead engineer for development of a 1060 m3/d (6.7 MGD) membrane filtration, reverse osmosis, and vacuum tower deaeration system to be installed offshore in the South China Sea. The project included Chemical Enhanced Oil Recovery (CEOR) chemical storage and mixing systems requiring addition of over 250 tons per day of soda ash and other chemicals in an offshore environment. After review of the logistics, Petronas repeated the project development process in an onshore environment, requiring development of methods to coordinate and control delivery of the CEOR injection water through a 170 km pipeline to the offshore field.

Appon­.tattox U[u­,­,,,.,.zpt�A,­e WaWr Generation, Systen-, Served as lead engineer for development of a 12 gpm ultrapure boiler feed water system for the Appomattox offshore platform. The project included reverse osmosis, membrane deaeration, and continuous electrodeionization to stringent water quality requirements.

Stuidy Oftshore Anqo[a
Project manager for study of facilities requirements for 600,000 bpd (25 MGD) offshore waterflood. Processes studied included membrane filtration, nanofiltration, reverse osmosis, and deaeration technologies as well as subsea pumping and treatment. The objective of the study was to determine weight and footprint impacts of various processes to enable design of the floating production and storage vessel.

Wn,.,.,,r Stand,,-.,rd CEOR PilOt
Project manager for in-house piloting demonstrating the ability to meet stringent injection water quality targets using seawater as a source. The project required developing innovative process combinations as well as proprietary control schemes to assure compliance with water quality targets.

Various CEOR Systen­�s
Developed processes and methods for treating seawater and produced water to provide injection water for over 30 users in various locations throughout the world, both onshore and offshore. Provided water quality consultation to clients to ensure the viability of the CEOR process.

Waiter Systeir,­��,�z; 11"or St_Jost,,,,,p1r, ELR Pil,s.:,A Projr,:,ct ;,iu­id Angsi CEOR Fietd Project FEED Designed the membrane treatment systems and was responsible for directing all process engineering activities, including the development P&IDs, PFDs, and HMBs.

City of Santa Ne,"Azi, CA
Project engineer responsible for development of chemical storage and metering facilities for a 20 MGD membrane filtration treatment plant for municipal water supply.

Long Beact Water, ffi,,,�partrrlent
Performed a feasibility evaluation for onsite chlorine gas generation for the Long Beach Water Department's Groundwater Treatment plant.

Santa Margarita W,.,,ter District
Design engineer for chlorine and ammonia feed systems and UV disinfection system for the Upper Chiquita Reservoir project.

Fror­i,t Porch
Provided peer review of evaluation of the Marina Coast Water District seawater desalter to determine cost and feasibility of returning the desalter to service after 10-year shutdown.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin

J
Stefanos Word is a project engineer experienced in optimization, planning, design, and construction of advanced groundwater treatment and surface water treatment facilities. His project experience includes ion exchange, desalination, air stripping, pressure filtration (VOC and inorganic removal), conventional physical -chemical treatment processes, and chemical storage/ injection facilities. Mr. Word's project experience also includes instrumentation and controls design for large- and small-scale facilities, His experience also includes state- and federal permitting, field collection of data, piloting, and startup of treatment facilities.

Attscadero NllutuW Water 0,.,tnpany, Syt':,amore an,,d Nonthern WTP I Mascadero, CA Project Manager and Process Technical Lead. Project consists of planning, design, and construction of 5.7 and 5.8 MGD groundwater treatment facilities designed to use GAC to reduce short- and long -chain perflourinated compounds and hydrogen sulfide concentrations below state -mandated response levels. Piloted GAC and ion exchange to determined process applicability and refined cost estimates and deep bubble aeration technology to reduce lead and copper corrosion within the distribution system. Designed piloting facilities, prepared testing protocols and conducted pilot testing for GAC, ion exchange, and deep bubble aeration technologies, conceptual and basis of design reports. Facilities include 20,000-pound GAC adsorption vessels, 350,000-gallon below -grade cast -in -place clearwells, high - service product water pump stations, surge control infrastructure, chemical storage and injection facilities, motor control center/electrical room, operations center, and security systems. Provided technical guidance for process design and Prepared Preliminary Engineering Reports, construction plans, specifications, and cost estimates for process/mechanical and instrumentation/controls design disciplines. (Ongoing)
sit y of Venu.,,ra Water Master Ptan� W,­,?ter Qui,,Hly Evii[u,,aion 1 Ventura, CA Project Engineer. Project consisted of performing several water quality evaluations for treatment process integrations and corrosion control parameters of proposed water supply and treatment projects. Evaluated water quality and process integration of the City's current surface- and groundwater supply sources with indirect- and direct potable reuse treatment being piloted and designed for the City's "PURE" Program. Analyses included evaluating blend ratios of new and existing water supplies, corrosion control parameters, and integration of new treatment processes within the City's Distribution System. Prepared writeups for analyses, findings, and recommendations for the Master Plan's Water Quality Chapter.

Jackson Randh DBP I (�','Ity, CA
Project Engineer/Process Technical Lead. Project consists mitigating disinfection byproduct formation for a development receiving potable water from a 5-mile transmission pipeline connected to Kettleman City. Prepared Feasibility Study/ Basis of Design TM that reviewed updated water quality, disinfection methods and disinfectants used, proposed water infrastructure, DBP formation potential and design criteria for the recommended treatment facility alternative. Selected project consisted of planning, design, and construction of a 0.28 MGD DBP Reduction Facility through progressive design -build project delivery. Facility includes several deep bubble aeration systems, below -grade cast -in -place clearwell, product water pump station, surge control infrastructure, chemical storage and injection facilities, motor control center/electrical room, operations center, and security systems. Prepared construction plans, specifications, and cost estimates for process/mechanical, civil and instrumentation/controls design disciplines. (Ongoing). a..­,,..ily Trent,'-- Fa,."rr,,,s: Grouindvater Q�,_.akty Ev,,aluatim I Tt,aaire, CA Project Engineer. Project consists of planning, design, and construction of a new potable 250 gprn groundwater well to mitigate 1,2,3-trichloropropane,

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

ar Re a i RM: We we k,
dibromochloropropane, and nitrate in the existing potable water well. Provided analysis of groundwater contamination and prepared a corrective action plan and quarterly progress reports for the Division of Drinking Water. 3u.n..­�er Ran,,,-J`,, West Pl,,­se 2ATest Wel$ DesigI Nlllader,­,,�, CA Project Engineer. Project consisted of planning, design, and construction of potable water pumping, storage, and distribution facilities. Prepared plans, specifications, and cost estimate for the construction of test well located near Valley Childreds Hospital. Analyzed water quality results for potential iron, manganese, and nitrate treatment.

Smit'Ah, San Lui�,,, Ob(k�,,.,po Sanft,,sry Dist-rict, Pretreaon,­-.,,,,mt Prograrn Update 1 Oceans, CA Project Engineer. Project consisted of updating the District's industrial wastewater pretreatment program through extensive review of existing ordinances, water quality data, and pretreatment ordinance s/surcharge rate structures from similar agencies. Developed TM outlining water quality deficiencies, comprehensively reviewed existing and new model ordinances, and provided recommendations for pretreatment program updates.

Rar-ch West� Pradi,mtion Wel"U #I D(,-,sign1 M,'adeni, CA Project Engineer. Project consisted of planning, design, and construction of potable water pumping, chemical storage and injection, electrical, and telemetry communications facilities for a 1.44 MGD potable well water supply facility.

Responsible for design of sodium hypochlorite storage and feed system and associated instrumentation and controls.

Prepared construction plans, specifications, and cost estimates for process/mechanical, and instrumentation/controls design disciplines. (Ongoing)
City of Fresno Pi,,,nnp Station 89A, 133, 150 Boosteir Pump Station Fresn,,o, CA Project Engineer. Project consists of planning, design, and construction of several new vertical turbine booster pump stations with several downstream chemical injections to replace existing booster pumps and improve treated water supply by overcoming increasing distribution system backpressures that previously hindered supply to each local pressure zone using the previous split -case booster pumping configurations. Prepared Basis of Design Report, construction plans, specifications, and cost estimates for process/mechanical, civil and instrumentation/controls design disciplines. (Ongoing)
City of Fresno Pa,mp Stiation 345-1 GrOLi.'idwater'Tti-eat.,"f,,e)!,, Faci6ty I Fre!,;no, t"A Project Engineer. Project consists of planning, design, and construction of a 0.58 MGD manganese dioxide filtration facility with several up- and downstream chemical injections. The primary goal of the facility was to reduce hydrogen sulfide, iron, manganese, and arsenic concentrations below state and federally -mandated maximum contaminant levels. Evaluated air stripping, catalytic activated carbon and manganese dioxide filtration as feasible contaminant reduction strategies. Prepared Basis of Design Report, construction plans, specifications, and cost estimates for process/mechanical, civil and instrumentation/controls design disciplines. (Ongoing) Meiner's Oaks Water Dis,,,rk,:t smI"ac-C Plant I CA
Project Engineer/Process Technical Lead. Project consists of planning, design, and construction of a 1.0 MGD surface water treatment facility treating groundwater under the influence of surface water through direct filtration technologies with chlorine gas, sodium hypochlorite, coagulant, and provisions for ammonia sulfate storage and injection facilities. Prepared Design Direction TM, construction plans, specifications, and cost estimates for process/ mechanical and instrumentation/controls design disciplines. (Ongoing) will. of Fresno Pump St,­,,,,0c­,o\­,, 177 FaciMlly I Fresno, CA Project Engineer. Project consists of planning, design, and construction of a 1.37 MGD deep bubble aeration system and granular activated carbon facility with several downstream chemical injections. The primary goal of the facility was to reduce the 1,2,3-TCP concentrations below the state -mandated maximum contaminant level of 5 pg/L and dissolved carbon dioxide concentrations to mitigate pipeline corrosion. Evaluated air stripping, sodium hydroxide injections, and break -tank deaeration as potential carbon dioxide removal treatment strategies. Prepared Basis of Design Report, construction plans, specifications, and cost estimates for process/mechanical, civil and instrumentation/controls design disciplines. (Ongoing)

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
,a
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkin,

PhD, Resource Ecology &
Management, School ofNatural
Resources &Environment,
University ofMichigan
MA, Geography, Boston
University
BA, Economics, Johns Hopkins
University
Association ofEnvironmental
Professionals
VVateReuseAssociation, Los
Angeles Chapter, Board Secretary
Association nfCalifornia Water
Agencies
Association ofWomen inWater,
Energy, and Environment
Women inEnvironment

YEARS OF EXPERIENCE
20 HOME OFFICE
Los Angeles, CA
RinconConsultants, Inc.

Environmental Scientists - Planners -Engincors
Dr]ennifer]acobushas2Oyeaoofpro/es iona|expehenceandareputa1onfur customer service and client satisfaction. Dr. Jacobus focuses exclusively unwater and wastewater clients and projects throughout California, delivering a diverse array of environmental services to meet the unique needs of each district and community. Dr. Jacobus manages on -call contracts and has successful record of completion of California Environmental Quality Act ([E[V\)/ National Environmental Policy Act (NEPA)documents, natural resource permits, regulatory processes, and funding applications spanning a broad spectrum of projects that range from treatment plants and distribution systems, potable reuse and recycled water projects, togroundwater management, reservoir storage, water rights and surface water diversion projects. As a scientist with foundational training in ecology and resource management, Dr. Jacobus has akeen ability tucommunicate with technical teams 10ensure appropriate and relevant analyses across all disciplines.

Dr. Jacobus also has experience working with engineering design teams 10 understand project features and operational criteria and transcribe technical specifications into language that is accessible to the public for CEQA/NEPA documents. In addition, Dr. Jacobus has published scientific articles in the field of fisheries and aquatic ecology.

Project Manager, Water Replenishment District of Southern California (WRD) — Central and West Coast Groundwater Basins Master Plan (GBMP) CEQA-Plus Program Environmental Impact Report (EIR), Los Angeles County Central and West Coast Basins. The GBMP identifies and evaluates a menu of projects and management strategies to increase replenishment and beneficial use of recycled water and captured stormwater. The Program EIR included analysis of environmental justice to provide a NEPA-ready document that would fulfill CEQA- Plus requirements for federal funding opportunities. While at a previous firm, Dr.

Jacobus oversaw the CEQA process for WRID and collaborated with the authors of the GBIMP to prepare a separate groundwater chapter that explains the groundwater modeling scenarios and potential impacts/benefits of the GEMP and various project combinations.

Project Manager, VVRD—Groundwater Reliability Improvement Project (GR|P) Supplemental Recharge Wells Project Supplemental E|R(SBR),Los Angeles County
While at a previous firm, Dr. Jacobus managed a consultant team to complete the CECA SE|Rprocess for the GRIP injust nine months under anaggressive schedule.

The SEIR evaluated proposed modifications to the previously certified EIR, including construction of three injection wells at the GRIP Advanced Water Treatment Facility to allow recycled water to be recharged into the Central Groundwater Basin during periods when the Montebello Forebay Spreading Grounds are unavailable.

The expedited environmental compliance schedule leveraged existing information and reports, including extensive groundwater modeling for the Title 22 Engineering Report, toprepare aFocused SE|Rthat received few public comments.

STATEMENT opQUALIFICATIONS FOR CITY oponwwc,FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Project Manager, VVIRD—Salt and Nutrient Management Plan pNK0MSubstitute Environmental Document, Loa Angeles County
While at a previous firm, Dr. Jacobus managed the preparation of the Substitute Environmental Document (SED) for the SNMP for the Central and West Coast Basins for WRD and other stakeholders, including the Los Angeles Regional Water Quality Control Board (LARWQCB). The SNMP is an amendment to the Water Quality Control Plan (Basin Plan) for the Los Angeles Region. The basin planning program is a Certified Regulatory Program and exempt from certain requirements of CEQA. Instead of an EIR, the SED was prepared for the LARWQCB to comply with CEQA and the State's Recycled Water Policy. The SNMP characterized the basins' current and future assimilative capacities for salts and nutrients (S/N), including total dissolved solids, chloride, and nitrate. Dr. Jacobus coordinated closely with WRD and LARWQCB to prepare this document, which was the first SED for a SNMP in the Los Angeles Region.

Project Manager, Irvine Ranch Water District (|RVuD)—Wells 21, 22, and Tustin Legacy 1Projects, Initial Study - Mitigated Negative Declaration (IS-M0D), Environmental Assessment, and Addendum, Orange County While at a previous firm, Dr. Jacobus managed the preparation of the IS-M N D/Environ mental Assessment and successfully met aggressive schedule requirements for federal funding. IRWD was awarded federal funds through the American Recovery and Reinvestment Act mf2O89from the Bureau of Reclamation for this project. The project sought to recover and treat impaired groundwater to augment local water supplies and increase water supply reliability. The proposed project installed wellhead equipment on two existing groundwater wells (Wells 21 and 22)' drilled one pmductiunweU(VVeUTLl)'andconstmctedanewwetertpeatmentp|antandwatertransmioioopipe|inesinthe cities ofTustin and Irvine, The {S-N1NDwas certified in pebruary20l0. In 2011' Dr. Jacobus prepared anAddendum to cover modification nfthe location ofWell TL-1.

Project Menager,|RWD—Baker Regional Water Treatment PlantBR, Lake Forest While ataprevious firm, Dr. Jacobus managed the preparation of the EIR for the IRWD Baker Regional Water Treatment Plant project. The goal of the proposed project is to increase water supply reliability in southern Orange County by creating redundancy of treatment system capacity and distribution infrastructure for potable water in the event of facility outages due to routine maintenance or unforeseen emergencies. The project upgraded the existing Baker Filtration Plant in the city of Lake Forest, constructed additional transmission pipelines, and installed a new pump station, all within the Central Subarea of the Orange County Natural Community Conservation Plan.

Project yNamaQer, PahndaleVVsterQbtrict(PVVD}—VVaterSystemKAasterPlanProgram EIR, Palmdale The Water System Master Plan involves construction of water system improvements throughout the 47-square-mile PWD service area to meet its potable water system current and future needs. The Master Plan identifies existing system deficiencies that need to be corrected as well as future facilities to be implemented in the near -term and long- term,indudinguptozBmi|esnf6-inchtoZ4-inch-diameterpipe|inethatneedtoberep|acedorupgededayweUas new pump stations and storage tanks. The Program E|Rwas certified in 20l8.While ata previous firm, Dr. Jacobus managed the [sQA process for the sm and worked with Pvvotu develop the scope and approach tnthe technical studies for biological and cultural resources.

Project Manager, City of Long Beach/Long Beach WaterDepartment—DemmtrationDesaUmatkmProjecxSiting Analysis and Proposition 5QApplication, Los Angeles County As part of the City of Long Beach's Demonstration Desalination project consultant team, Dr. Jacobus conducted the site analysis and screening of prospective locations for the City's proposed clesalination project. The analysis and compliance plan were included in the City's successful application for Proposition 50 funding. While at a previous firm, Dr. Jacobus also prepared an Addendum to the IS-MND for the changes made to the pilot project after preliminary hydrogeologic testing was completed, then facilitated all permit applications for the pilot project. All permits were successfully issued, including a Coastal Development Permit; United States Army Corps of Engineers Section 10 Nationwide Permit; State Water Resources Control Board Clean Water Act Section 401Water Quality Certification; Regional Water Quality Control Board National Pollutant Discharge Elimination System permit; and Regional Water Quality Control Board Low Threat Waste Discharge Requirements.

RinconConsultants, Inc.

Environmental Scientists -planneo-snomeeo
STATEMENT opQUALIFICATIONS FOR CITY uF DOwEY FOR ��
u�oxupnopsssmw«Lnw/Lswmwssn/wossnvmsy �������

EDUCATION
BS, Environmental Science,
Texas Christian University

CERTIFICATIONS
CEQA Practice Certificate,
University of California, San
Diego Extension

AFFILIATIONS
WateReuse Association,
California Section

YEARS OF

EXPERIENCE
6 YEARS WITH RINCON
6 HOME OFFICE
Los Angeles, CA
Rincon Consultants, Inc.

Environmental Scientists - Planners • Engineers
Annaliese Torres
Senior Environmental Planner/Project Manager
Annaliese has over six years of experience and specializes in overseeing preparation of California Environmental Quality Act (CEQA), CEQA-Plus, and National Environmental Policy Act (NEPA) documentation for water and wastewater infrastructure projects. She has worked with several water and wastewater agencies, including the Water Replenishment District (WRD), The Metropolitan Water District of Southern California, Central Basin Municipal Water District, West Basin Municipal Water District, and Santa Clarita Valley Water Agency, to prepare CEQA documentation for infrastructure projects such as potable and non -potable water pipelines, groundwater wells, pump stations, reservoirs, and treatment facilities.

CEQA/Technical Analyst, Water Replenishment District of Southern California - Sativa Well #5 IS-MND, Los Angeles County
In support of WRD's technical assistance to the Sativa Los Angeles County Water District, Rincon prepared a CEQA-Plus IS-MND and technical studies for the construction of a new wellhead treatment system for iron and manganese in Willowbrook. Annaliese served as a primary author of the IS-MND and prepared the technical air quality, greenhouse gas (GHG), and noise analyses. Rincon also assisted WRD with Native American consultation. The CEQA documentation was included as part of the project's application to the Drinking Water State Revolving Fund program.

Project Manager, Central Basin Municipal Water District - Montebello Hills Recycled Water Pipeline and Pump Station Project IS-MND, Los Angeles County Annaliese served as Project Manager for the preparation of an IS-MND for a recycled water pipeline and pump station proposed by Central Basin Municipal Water District.

She was responsible for managing internal biological and cultural resources staff, leading weekly status update calls, and attending public meetings. Key issues evaluated in the IS-MND included impacts related to California coastal gnatcatcher, hazards and hazardous materials, noise, and tribal cultural resources.

Project Manager, Santa Clarita Valley Water Agency — S Wells PFAS Groundwater Treatment and Disinfection Facility Project IS-MND and Technical Studies, Los Angeles County
Annaliese is serving as the Project Manager for preparation of technical studies and an IS-MND for the S Wells PFAS Groundwater Treatment and Disinfection Facility Project, which involves construction of a PFAS groundwater treatment and disinfection facility and installation of a new groundwater well, stormwater drainage pipelines, interconnection pipeline, influent pipeline, and roundabout improvements on a site adjacent to the Santa Clara River. Key issues for the project include biological resources due to the project's potential to affect groundwater dependent ecosystems via increased localized groundwater extraction during operation, recreation due to the location of Bridgeport Park and the Santa Clara River Bike Trail within the project's temporary construction footprint, construction noise and traffic due to the project's location in a residential neighborhood and near Bridgeport Elementary School, and water quality due to the project's proximity to the Santa Clara River.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

Annaliese Torres, Page 2
Program Manager, The Metropolitan Water District of Southern California — Environmental Planning Services (On - Call), Southern California
Annaliese is responsible for managing Rincon's on -call contract with The Metropolitan Water District of Southern California. Under this contract, Annaliese is overseeing several assignments, including a Program EIR for the F.E.

Weymouth Water Treatment Plant and La Verne Site Improvements Program, an EIR for the Garvey Reservoir Rehabilitation Project, and implementation support for the Climate Action Plan, including annual progress reporting and GHG inventory updates.

Project Manager and Technical Reviewer, Santa Clarita Valley Water Agency, Well 205 Groundwater Treatment Facility Project IS-MND and WIFIA NEPA Compliance, Los Angeles County Annaliese served as project manager and technical reviewer for the Well 205 Groundwater Treatment Facility Project IS-MND. In her capacity as technical reviewer, she provided a comprehensive review of the air quality, energy, and greenhouse gas emission modeling completed for the IS-MND to ensure consistency with the project description and accuracy in calculations. Annaliese also oversaw preparation of supplemental federally -compliant biological and cultural resources reports as well as a Programmatic Environmental Assessment Questionnaire in support of the project's Water Infrastructure Finance and Innovation Act (WIFIA) application to the United States Environmental Protection Agency.

Project Manager, City of Pismo Beach - Central Coast Blue CEQA-Plus Program/Project EIR and Environmental Permitting, San Luis Obispo County
Annaliese is serving as Project Manager for the provision of environmental documentation and permitting support for the City of Pismo Beach's Central Coast Blue project. The project is a multi -jurisdictional indirect potable reuse project intended to develop a seawater intrusion barrier for the Santa Maria Groundwater Basin and includes an advanced treatment facility, injection wells, monitoring wells, a new production well, and water distribution and agricultural irrigation pipelines located in Grover Beach and unincorporated San Luis Obispo County. Key issues in the CEQA-Plus EIR included cultural resources, California red -legged frog, discharge of reverse osmosis concentrate, recreation, and growth inducement. The EIR included a detailed, project -level analysis of several components of the project for which design details were available. Where project -level details were not yet known, a programmatic approach was used to assess the impacts. Preparation of a hybrid Program/Project-level CEQA document will provide flexibility for the initial phases of the project to move forward while details for future phases of the project are determined. The Final EIR was certified by the City of Pismo Beach in February 2021. The project was approved in March 2021, and Annaliese is now overseeing the environmental permitting for the project, including coastal development permits from the California Coastal Commission, a U.S. Army Corps of Engineers Section 404 Permit, a Regional Water Quality Control Board Section 401 Water Quality Certification, a California Department of Fish and Wildlife Section 1602 Lake and Streambed Alternation Agreement, and consultation with the United States Fish and Wildlife Service.

Project Manager, Mesa Water — Wilson Street Pipeline Replacement Project Categorical Exemption, Environmental Impact Analysis, and Contaminated Soil Contingency Plan, Orange County Annaliese served as Project Manager for the preparation of Categorical Exemption documentation for Mesa Water's Wilson Street Pipeline Replacement Project, which consists of an approximately 4,580-foot linear pipeline alignment extending along Wilson Street between Newport Boulevard and Harbor Boulevard. Rincon prepared a Notice of Exemption along with a memorandum details the applicability of the Class 1 and Class 2 Categorical Exemptions to the project and an abbreviated Initial Study to demonstrate the project would not result in significant environmental impacts due to an unusual circumstance. As part of this process, Rincon recommended appropriate avoidance and minimization measures to incorporate into the project, include pre -construction nesting bird surveys, procedures for unanticipated discoveries of cultural resources, a Contaminated Soil Contingency Plan, restrictions on the use of vibratory rollers, and a traffic control plan. Rincon also prepared the Contaminated Soil Contingency Plan for Mesa Water prior to the start of construction.

Rincon Consultants, Inc.

Environmental Scientists • Planners • Engineers

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES k%

ME| |SSA kXANN' RVVA RIGHT OF WAY ACQUISITION LEAD
Melissa Mann baProject Manager based atEP|C'sInland Empire Regional Office in Riverside. Having performed over 400 right of way acquisitions in her career, she continually negotiates voluntary acquisition agreements with even the most di[Dcu|t-top|easeproperty owners, Melissa isatrained right ofway professional and designated Right nfWay Agent <RVVA through the International Right ofWay Association (|RVVA' and has 1O-yearcareer background in administration and customer support for a range of companies and institution, in Southern California. She isskilled atexplaining complex concepts togeneral audiences. For this on -call contract with the Water Replenishment District of Southern California (WRD), Melissa will support the design phase by preparing easement acquisition packages and confirming right of way acquisitions. She will support any other right of way needs that arise during the contract such as ordering and review of title, coordination with regulatory agencies, and professional hghtofwayinsight throughout project life cycles.

NOTABLE EXPERIENCE
Well Pump Site Willing Seller Land Acquisitions for New Water Infrastructure Facilities Near Ludlow, Cadiz, Inc., San Bernardino County, [A: A, Right nfWay Project Manager, Melissa |ssupporting this water infrastructure developer by approaching landowners for the voluntary sale of partial land rights for the purpose of building monitoring well pump sites. Melissa is leading the project team with prioritizing land acquisitions based on project components including location, proximity to existing infrastructure, terrain, and topography.

Pipe Segment Replacement Acquisitions forKnu||wood Circle Sanitary Sewer Improvement Project' City of Anaheim, Anaheim' CA: The City is replacing structurally deficient sewer pipe segments in medium density residential areas ofthe City toaddress capacity constraints and operational deficiencies. The new sewer pipeline will improve reliability for the properties in the service area and provide additional capacity to accommodate flow increases from future growth.

The new sewer pipeline will begin at the north end of Kno||wnod [irdr, cross through the private properties, terminating in Magnolia Avenue. As Right of Way Lead' K8c|ina is overseeing quality and completion of real estate valuations, acquisition negotiations, and escrow for Temporary Construction Easement (TC[s)that need tobeobtained toconstruct the improvements.

Flood Easement Acquisitions for VVhitewater River Stormvvatar Channel, Coachella Valley Water District (CVWD), Agua Caliente, CA: The Coachella Valley Water District requires right of way acquisition services to obtain flooding easements for a portion of the Whitewater River storm water channel owned in trust by the Bureau of Indian Affairs (B|A) and B|A a||otteesAs Right ofWay Project Manager, Melissa and the EPIC team are working directly with the R|A and allottees to renew CVWD flood easement rights agreements on 12 property tract, The ,cope of work includes identifying all ownership interests, coordinating appraisal reports' acquisition negotiations, escrow coordination, and processing all paperwork toreflect CVVVDinterests.

STATEMENT oFQUALIFICATIONS FOR CITY opoowws,FOR
mk ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

wcussx Mxmm' evvA | RIGHT oFWAY ACQUISITION /cAo
Water Infrastructure Improvement Auqm5iilozrfor Santa Fe Drive Corridor Bike and Pedestrian Improvements Project, P6&E phase, City ofEncinitas, CA: Santa Fe Drive is a two-lane road where pedestrians and cyclists share the roadwaywith motorvehicles. This projectwill construct new sidewalks, curb and curb ramps for an approximate

1.25'mi|e'|onQ segment along the north and sound sides of Santa Fe Drive. The project will also include improvements to storm drain facilities, municipal sewer conveyance, and road widening toallow a 5-foot bike lane addition in each direction. The project is funded by the Federal Highway Safety Improvement Program (HS|P) and Active Transportation Program (ATP). As the oubconsu|tant Right of Way Project Manager to the design engineer, Melissa oversaw the right of way acquisition process' from title clearance, land valuations, and acquisition negotiations to acquire rights to eight (8) private interests. The acquisition areas are for temporary construction easements and permanent easements to build the bike path. To close-outtheproject, EPIC will obtain Ca|trans Right ofWay Certification atLevel 1or2.

WRD 5erviceArea and Caltrans Direct Coordinatlon Property Rights Transfer for BNSF Magellan Grade Separation, Magellan Atlantic |, LL[ Vernon, CA: EPIC is the subconsu|tantto the design engineer to complete a transfer of property rights in Vernon' CA' currently owned by[a|trans District into possession by private property owner who owns adjacent parcels. The Caltrans parcel and three parcels owned by a single private owner are implicated in a BNSF Railway grade separation project. As Real Estate Consultant, Melissa is performing professional real estate services and coordination to transfer property rights on one parcel owned by Caltrans to a private entity who owns adjacent parcels. Melissa's primary responsibility involves coordination between [ubrans District 7'the private property owner, title and escrow companies, and the other stakeholders, as needed, to complete the transfer of rights as stipulated by the resulting acquisition agreement.

Award Winning Large Wntxne Right of Way Acquisition S*noie/ for U3-395 Widening Phase | Project, San Bernardino County Transportation Authority (SB[TA) in coordination with Cahr ns District O, Ade|anto and VictnrviUe,[A: Melissa played a crucial part of this high -profile project in which Caltrans acted as the engineer. This project extends approximately seven miles and accommodates a variety of vehicular uses and mobility between Southern California and the Eastern Sierras. The roadway carries a large volume of traffic with a high percentage of trucks' with over Z'OOOcrashes estimated to have occurred since 1992 prior tothe improvements. The primary purpose of the project was to improve safety through the addition of second lane in each direction, a median' and turn lanes at key intersections. Melissa provided community outreach services, title and escrow coordination, and acquisition negotiation to ultimately secure rights to GZ property interests on behalf ofSB[TA. This project was awarded ^2O2OProject ufthe Year" bythe VVTSInland Empire Chapter.

STATEMENT orQUALIFICATIONS FOR CITY upDOwEY FOR ��
owoAupnoFsssmm«Lmv/Lswmwssn/wossnvmsy 00�kin

COTTON, SHIRES AND ASSOCIATES, INC.

CONSULTING ENGINEERS AND GEOLOGISTS
CURRICULUM VITAE — MATTHEW J. JANOUSEK
Principal Geotechnical Engineer
Southern California Office Manager
Current Address
COTTON, SHIRES AND ASSOCIATES, INC.
699 Hampshire Road, Suite 102
Thousand Oaks, California 91361
Phone: (805) 370-8710
Email: [email protected]
Registrations
Registered Geotechnical Engineer in California, GE 3005 Registered Professional Civil Engineer in California, PE 73401 Certifications
OSHA 40-Hour HAZWOPER Certified
Nuclear Gauge/Troxler, No. 2125417
USACE Levee Inspection Trained
Education
M.B.A., California State University, Northridge, 2020
M.S., Geotechnical Engineering, University of California, Los Angeles, California, 2005 B.S., Civil Engineering, Colorado State University, Fort Collins, 2003 Revresentative Experience
Mr. Janousek is a registered California Professional and Geotechnical Engineer with 20 years' experience in geotechnical studies, including subsurface exploration, laboratory testing, engineering analyses and reporting, plan review, and construction observation. He has coordinated field explorations and managed geotechnical studies for water and wastewater pipelines, above -ground and buried tanks, levees, roadways and retaining walls.

Mr. Janousek specifically has Water Replenishment District (WRD) experience as the project manager and lead geotechnical engineer for supplemental Low Impact Development (LID) Design at WRD's Field Operation and Storage Annex in the City of Lakewood. His other public works project experience includes design for Bell Canyon Reservoir #3, a study currently being conducted for the County of Ventura's Water and Sanitation District.

Mr. Janousek was also the lead geotechnical field engineer during construction of the Harris Reservoir in Thousand Oaks, which was performed for the California Water Company. Mr.

Janousek was also the lead field engineer during construction of Camrosa Water District facilities, which included grading and construction of an above -ground steel tank. He is also part of CSA's on -call emergency response team, which provides services to the cities of Malibu, Rancho Palos Verdes, and Thousand Oaks.

SHIRES AND ASSOCIATES, INC.

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
mk, ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

MATTHEW J. JANOUSEK (cont.)
Professional History
Principal Geotechnical Engineer, Cotton, Shires and Associates, Inc., 2023 to Present Supervising Geotechnical Engineer, Cotton, Shires and Associates, Inc., 2019 to 2022 Senior Geotechnical Engineer, Cotton, Shires and Associates, Inc., 2015 to 2018 Project Geotechnical Engineer, Fugro Consultants, Inc., Ventura, CA, 2008 to 2015 Staff Geotechnical Engineer, Kleinfelder, Inc., Diamond Bar, CA, 2005 to 2008 Professional Affiliations
American Public Works Association (APWA), Ventura County Chapter (2008) - Chair, Annual Scholarship Golf Tournament (2016-2018) American Society of Civil Engineers (ASCE)

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES mkzwk-n,

Joe baProject Manager atPSEwith ademonstrated history ofexperience working nnavariety o[projects ranging from small tnlarge-scale capka|impmvementpnojects for municipalities. Joe is well versed in seismic design and analysis and has a solid understanding of project needs from initial data gathering and review, to design and analysis, to permitting and construction support, including submittal reviews and on site observations.

City of Escondido, WTP Improvements, Escondido, CA
PSE provided structural engineering services for improvements to several existing and replacement of existing Hypochlonte tank. PSE performed a site visit to verify existing structural components and gather as -built information on the building and foundation The evaluation included the main seismic resisting elements of the building, as well as nonstructural items such as life saLety3A_1qems mechanical and electrical oment, liQht fixtures, etc. The results of the condition assessment were used to identify, prioritize and evaluate alternatives for rehabilitating or replacing the existing lift station.

Vista Irrigation District 4 Reservoir Evaluations, Vista, CA capacities from O.6MG to 1.3MG. Three of the reservoirs are reinforced concrete with wood roofs and constructed in the mid 1920's. The fourth reservoir is prestressed concrete and constructed in 1978. Our evaluation consists of a combination of dry and wet inspections of the reservoirs, a full structural analysis based on current code provisions and subsequent will be summarized in a technical report to include respective construction cost estimates. (Project is currently in design.)
as seismic slosh, anchorage requirements and fall arrest systems. PSE is currently in the design phase of the roof upgrade.

City of Garden Grove, Pump and Well Building Evaluations, Garden Grove, CA As part of a master plan, PSE evaluated multiple pump station facilities spread over12sites. including 5pump/booster station structures and 13wells structures. Evaluations were in conformance with an ASCE 41 "Seismic Evaluation and Retrofit of Existing Buildings" Tier 1 deficiency screening, which involves a rigorous checklists based on the performance objective, hazard level, and type of construction. The screenings were performed considering all structures as Risk Category IV and were based on the review of as -built drawing as well as on -site assessments at each site. Original construction eras for the structures ranged from as early as 1966 through 1997 and the quality and condition of the individual structures varied significantly. PSE provided a report which identified levels of deficiencies and corresponding risks aswell aaadetailed analysis meeting the A3CE41criteria. mksrmEw�Topuuxu�m QUALIFICATIONS FOR �FO
R
m�w���w ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES

IN a i WWIi
Consulting Electrical Engineers
RN 1111114ir"RINN011111 1
Principal Electrical Engineer
1986-1994 San Diego Mesa College
1995-1997 San Diego State University, Electrical Engineering

PROFESSIONAL EXPERIENCE
California P.E. License E-15691 issued in 1998
Mr. Green is a California registered electrical engineer with over thirty years of electrical design experience in Southern California. He specializes in the design of industrial power systems including electrical and controls systems for water and wastewater facilities. Recent experience is with pump stations, lift stations, wells, and water/wastewater treatment plants. He has performed electrical and control system design, electrical power system studies, and construction support services for several projects in Southern California. Green's active design involvement in these projects from concept design through construction completion keep him current with design trends and advances in equipment technology.

Examples of recent relevant design project experience are outlined below:
• Rosecrans Booster Pump Station, Buena Park, CA
Booster pump station replacement with (3) 50HP and (2) 150HP pumps. Upgraded electrical utility service, emergency generator, and motor control center with variable frequency drives for pumps, lighting, and general power. Instrumentation and controls system with pressure, flow, and treatment instruments, VFD controls, pump controls, and SCADA PLC w/telemetry • Morro Hills No. 1 and No. 2 Reservoir Repairs, Oceanside, CA Booster pump station replacement with (3) 60HP pumps. Upgraded electrical utility service, emergency generator, packaged pump system with variable frequency drive control panel, lighting and general power. Instrumentation and controls system with pressure, flow, and treatment instruments, and SCADA PLC w/telemetry.
• Fire Mountain Recycled Water Reservoir and Pump Station, Oceanside, CA New 2.2MG Reservoir and Pump Station with (4) 25HP pumps. New electrical utility service, packaged pump system with variable frequency drive control panel, lighting, and general power.

Instrumentation and controls system with pressure, flow, level, and treatment instruments, and SCADA PLC w/telemetry.
• E Reservoir Replacement and Pump Station, Vista, CA
New 2.9MG Reservoir and Pump Station with (6) 50HP pumps. New electrical utility service, power distribution switchboard, separate pump variable frequency drive control panels, lighting and general power. Instrumentation and controls system with pressure, flow, level, and treatment instruments, and SCADA PLC w/telemetry.
2734 poker Avenue West I Suite M I Carlsbad I CA 92010 1 Tel. (619) 962-2356

STATEMENT OF QUALIFICATIONS FOR CITY OF DOWNEY FOR
ON -CALL PROFESSIONAL CIVIL ENGINEERING SERVICES %i

Gerry Green PE
Pump Station Projects

Page 2 of 2 ends