Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
25 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Fee Schedule
Per the City’s RFP, any hourly rate increases, year to year, will be requested in writing 60 days before June 30 along with justification for pricing escalations.
13191 Crossroads Parkway North, Suite 405
Industry, CA 91746-3443
562.908.6200 | 800.499.4484 | Fax: 562.695.2120
www.willdan.com
City of Downey
Department of Public Works
STATEMENT OF QUALIFICATIONS FOR FY 2024-2027
ON-CALL PUBLIC WORKS CONSTRUCTION
MANAGEMENT, INSPECTION AND
MATERIAL TESTING SERVICES,
RFQ NO. 24-02
MARCH 15, 2024
Attachment G
Table of Contents
Table of Contents ....................................................................................... Not included Page Count Cover Letter ................................................................................................ Not included Page Count Executive Summary ................................................................................................................................ 1 Project Understanding & Scope of Work .......................................................................................... 2 Firm Experience ....................................................................................................................................... 6 Project Team, Organizational Chart & Resumes ........................................................................... 14 Project Management and Capabilities ............................................................................................. 20 References & Reputation .................................................................................................................... 22 Fee Schedule .......................................................................................................................................... 23
March 15, 2024
Matthew Baumgardner, PE, Director of Public Works/City Engineer City of Downey, Public Works Department
11111 Brookshire Avenue, Downey, CA 90241-7016
Subject: Statement of Qualifications for FY 2024-2027 On-Call Public Works Construction Management, Inspection and Material Testing Services, RFQ No. 24-02
Dear Mr. Baumgardner,
Z&K Consultants Inc. (Z&K) proudly presents our proposal to the City of Downey’s Request for Proposals (RFP No. 24-762) for Citywide Inspection Services. Z&K is a certified Disadvantaged Business Enterprise, Women’s Business Enterprise, and Small Business Enterprise in Southern California. Z&K specializes in the provision of Construction Inspection, Project Management, Construction Management, Construction Administration, Pre-Construction Inspection, Staff Augmentation, and other Professional Engineering Consulting Services. The Z&K Team has held numerous similar contracts for local agencies.
The Z&K Team has been working diligently to understand every aspect of the City’s projects including reviewing the City’s Adopted Budget for Fiscal Year 2023-2024. This involvement provides us with a deeper understanding of the challenges that the City’s projects may be facing, as well as familiarity with the site and nearby stakeholders. This knowledge and preliminary legwork will help us to hit the ground running and help the contractor understand the project better, preventing possible issues that may arise. We understand that the City’s structurally balanced budget for FY2023-2024 is $272 million and the proposed General Fund expenditures are $115,079,000, which is a 2.7 percent increase over the previous years General Fund budget. The projected Public Works total for FY 2023-2024 is $132,831,224.
We will support the City to meet their Strategic Plan Goals that include:
§Fiscal Responsibility - Maintain a Financially Stable
Local Government
§Economic Vibrancy - Support community needs through
a stable, vibrant and diverse local economy
§Efficiency & Adaptability - Create an environment where new process and programs are encouraged and are
used to improve internal and external services
§Quality of Life, Safety and Infrastructure - Foster a safe community through key investments and provide
inclusive, diverse community programs and activities
§Public Engagement - Cultivate a trustworthy and
participatory local government through equitable,
transparent, and effective processes
The Z&K Team offers many unique strengths and advantages for this contract, including:
§Z&K is a Disadvantaged Business Enterprise (DBE),
Women’s Business Enterprise (WBE), and Small
Business Enterprise (SBE).
§Our proposed Senior Project Manager/Senior
Construction Manager and Senior Construction
Inspectors has over 100 combined years of similar
experience and has delivered over 225 similar
projects within the last 5 years.
§We have held over 50 similar contracts within the
past 5 years and currently hold 38 On-Call
Contracts including providing construction
management and construction inspection services.
§Key Personnel possess all necessary licenses and
registrations required for these projects.
§Z&K Team has already prepared a Risk Matrix
outlining critical elements to be top priority.
Z&K team have worked with the following agencies providing similar services to deliver public works projects on time and within budget.
»City of Alhambra
»City of Aliso Viejo
»City of Beaumont
»City of Bell
»City of Burbank
»City of Carson
»City of Chino
»City of Compton
»City of Corona
»City of Costa Mesa
»City of Eastvale
»City of El Segundo
»City of Hemet
»City of Irvine
»City of Irwindale
»City of Laguna
Beach
»City of Lake Forest
»City of La Mirada
»City of Lancaster
»City of Manhattan
Beach
»City of Moreno
Valley
»City of Newport
Beach
»City of Norco
»City of Norwalk
»City of Oceanside
»City of Palm Desert
»City of Pomona
»City of Rancho
Pales Verdes
»City of Riverside
»City of Rosemead
»City of San
Bernardino
»City of San Marino
»City of Santa
Monica
»City of South Gate
»City of Temecula
»City of Torrance
»Caltrans
»County of Los
Angeles
»County of
Riverside
Transportation
Department
»County of San
Bernardino
»Long Beach Water
Department
»Riverside Public
Utilities
I will serve as the management contact for the full duration of the contract, and I am authorized to bind the firm to the terms of the proposal and execute legal documents on behalf of the firm. Z&K Consultants, Inc. does not have any exceptions and commits to accept the terms and conditions to the language in the RFP documents. We are excited about this opportunity to serve the City of Downey and are committed to the successful and early completion of the City’s Project.
Sincerely,
Crystal Fraire, PE | President
17130 Van Buren Blvd. | Suite 122 | Riverside, CA 92504 951.310.7470 | [email protected]
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
PROJECT UNDERSTANDING | Our team provided a risk
management log, identifying various critical elements of the City’s upcoming projects that will be of top priority for Z&K’s proposed personnel. Our proposed key personnel are familiar with the City of Downey’s project and know the community well. The Z&K Team has carefully examined the project’s requirements to identify key personnel best suited to deliver excellent services for this project. Our Team is composed of experts in the following project types/features:
street and intersection widening, pavement and infrastructure rehabilitation and reconstruction, water and sewer infrastructure improvements, water supply treatment improvements,
groundwater well improvements, streetscape enhancements, landscaping and irrigation, “green street” projects, drainage infrastructure and stormwater infiltration improvements, sidewalk, curb ramps and other pedestrian circulation improvements. traffic signals, street lighting and fiber-optic communications.
PROJECT TEAM | Z&K is proposing the same team that
successfully delivered over 100 similar projects in the past 1 year alone. We have created unique staffing plan to meet the City’s needs and expectations for this Project. Z&K has carefully selected this “A-Team” and has committed our most qualified staff for the duration of the contract to deliver successful the City’s Project. Our team members’ unmatched experience in Construction Inspection Services of similar projects makes the Z&K team uniquely qualified to provide the requested services. We understand this is a staff augmentation services contract for a Construction Manager and City Inspectors services on City performed construction, third party construction covered under encroachment permits, as needed R/W inspections, and inspection of City or other agency Capital Improvement Projects as assigned.
Our Senior Construction Manager and Senior Construction Inspectors have Public Works experience and understand the expectations of the City since they have worked in the public and private ectors. They will integrate seamlessly with City staff to successfully deliver the City’s citywide projects. Our team members have a depth of resources to support them on this contract. Z&K has experienced alternate construction managers and inspectors to cover work, including night and weekend work. We have technical support such as drone pilots, schedule experts, constructability reviewers, designers, construction managers, project managers, surveyors, claims managers, and environmental specialists to support in all aspects of the Projects.
This Team works efficiently and with great comradery with City staff to achieve the community's goals. Z&K works proactively and diligently with City staff to successfully deliver projects under budget while mitigating numerous unforeseen delays. We understand the vital importance of community outreach in keeping the community informed with accurate project schedules and detailed outreach efforts.
EXPERIENCE | Z&K has successfully delivered over 50 similar Staff Augmentation Contracts projects serving in a similar capacity over the past 5 years. The Z&K team will act seamlessly as an extension of City staff and is prepared to provide the requested services. We have a track record of performing excellent services on similar contracts through saving significant time and cost from identification of the various critical elements controlling the project schedule to providing alternate practical solutions. Our team members’ unmatched experience in Inspection services of similar projects makes the Z&K team uniquely qualified to provide the requested services.
CAPABILITIES | Z&K has sufficient capacity to perform the work within the time limitations, considering our current and planned workload. We currently have over 50 construction managers and inspectors on staff. Z&K is proud of our reputation for having seasoned personnel and of the industry’s recognition of our ability to deliver projects ahead- of-schedule, under budget, without claims, and with outstanding customer service. Our proposed team members are recognized as experts in Construction Inspection Services and will provide “turn-key” Services for the City. Our Team has thoroughly reviewed the scope of work and are prepared to provide the requested services.
LOCAL SENSITIVITY | Our firm has successfully worked on numerous projects surrounding the City of Downey.
Our Team has a strong past performance on projects through our control of costs, quality of work, ability to meet schedules, cooperation, responsiveness, and other managerial and attitudinal considerations. Z&K commits to providing our best inspection services for timely project completion. We will dedicate the necessary resources to complete the Project on time and within budget. Our key personnel will be assigned to the project for the entire duration and will not be removed or replaced without concurrence from the City. We maintain close attention to our clients by tracking our contract budgets and schedules. Our Senior Construction Inspector will be available and is prepared to provide the requested services.
Z&K Firm Information
Legal Name Z&K Consultants, Inc.
Firm Certifications DBE, SBE, WBE
Type of Firm California C Corporation
Mailing Address 17130 Van Buren Blvd. #122
Riverside, CA 92504
Fax Number 949.630.3242
Resident Project
Representative
Zack Faqih, PE, QSD/P
Email [email protected]
Phone Number 949.637.5040
Year Founded 2009
We understand that the City has the following
upcoming engineering construction work:
Street and intersection widening, pavement and infrastructure rehabilitation and reconstruction, water and sewer
infrastructure improvements, water supply
treatment improvements, groundwater well improvements, streetscape enhancements, landscaping and irrigation, “green street”
projects, drainage infrastructure and stormwater infiltration improvements, sidewalk, curb ramps and other pedestrian
circulation improvements. traffic signals,
street lighting and fiber-optic communications.
Our team and firm have delivered over 100
similar projects in the past 1-year alone.
Z&K has successfully
held over 50 Staff
Augmentation
Contracts providing similar services in the
last 5 years.
PROJECT UNDERSTANDING & SCOPE OF
WORK
PROJECT UNDERSTANDING & SCOPE OF WORK
Z&K Consultants has features, skills and services that distinguish our firm and make it the better choice for the City.
The Z&K Team has significant local experience to the City and community of Downey, unmatched experience to perform Construction Management and Inspection Services, and have highly skilled, multi-disciplined, and technical staff with extensive similar project experience.
We will support the City to meet their Strategic Plan Goals::
§ Fiscal Responsibility - Maintain a Financially Stable Local Government
§ Economic Vibrancy - Support community needs through a stable, vibrant and diverse local economy
§ Efficiency & Adaptability - Create an environment where new process and programs are encouraged and are used to improve internal and external services
§ Quality of Life, Safety and Infrastructure - Foster a safe community through key investments and provide inclusive, diverse community programs and activities
§ Public Engagement - Cultivate a trustworthy and participatory local government through equitable, transparent, and effective processes All projects are rated according to the following priority levels:
§ Priority 1: The project is urgent and/or mandated,
and must be completed quickly. Failure to
address the project will impact the health, safety,
or welfare of the community, or have a significant
impact on the financial well-being of the City. The
project must be initiated or financial/opportunity
losses will result.
§ Priority 2: The project is important and addressing
it is necessary. The project impacts safety, law
enforcement, health, welfare, economic base,
and/or the quality of life in the community.
§ Priority 3: The project would enhance the quality
of life and would provide a benefit to the
community. Completion of the project would
improve the community providing cultural,
recreational, and/or aesthetic effects.
§ Priority 4: The project would be an improvement
to the community, but need not be completed
within a five year capital improvement program.
As the City evaluates and determines its priority projects, it also considers external mandates, program needs, state policy direction, and available funding sources: eternal mandates, program needs, state policy direction, and fading consideration.
General Fund Operational Impacts: The vast majority of projects in the City’s five-year CIP are capital maintenance projects with no future net impact on the general fund operating budget. In a few cases, there may be some minor savings due to increased energy efficiency or a reduction of water use. Where there will be operational impacts (i.e., landscaping services required after the installation of a new landscaped median) those costs have been noted in the chart depicting CIP project cost projections over the next five years.
The Z&K Team has been working diligently to understand
every aspect of the City’s projects including reviewing the City’s Adopted Budget for Fiscal Year 2023-2024. This
involvement provides us with a deeper understanding of the challenges that the City’s projects may be facing, as well as familiarity with the site and nearby stakeholders. This knowledge and preliminary legwork will help us to hit the ground running and help the contractor understand the project better, preventing possible issues that may arise. We
understand that the City’s structurally balanced budget for FY2023-2024 is $272 million and the proposed General Fund expenditures are $115,079,000, which is a 2.7 percent
increase over the previous years General Fund budget. The projected Public Works total for FY 2023-2024 is
$132,831,224. The City has upcoming engineering
construction work, including streets, traffic safety, public facilities, water utilities, sewer, and storm water.
QA/QC PROCEDURES Described below are the activities involved in delivering the tasks in the general order they will occur. The tasks identified in the scope of work require varying staff commitments. The staffing plan is presented with the ability to reallocate manhours as needed to fit the Project needs.
Pre-Bid Phase
Activity Description Deliverable
Bid–AAA
Assist the City in finalizing the bid document, evaluate bidder/qualifications, bid opening/Analysis, and award process through City Council Award.
Review and Coordinate
with City’s PM
Constructability
Review/Quantity Takeoff
Review for constructability, bid ability and perform value engineering. Conduct independent quantity take-off for construction cost.
Constructability
comments/ Construction
cost
Coordinate with Utility
Co. Meet with all utility companies responsible for relocating their lines and equipment. Meeting agenda / minutes
Photograph and Video
Document the site Take pre-construction photos and videotape conditions. Photos, dated with labels, video
Project Schedule/ Long
Lead Items Evaluate Design Engineer’s proposed schedule for construction duration and cost. Construction Schedule Kick-off Meeting Arrange a pre-construction meeting with agencies, contractor, and utility companies and address all concerns. Review contract administration items.
Meeting agenda and
minutes
Conforming to
City/Caltrans Standards
Review and assist staging plans for compliance with the law and Caltrans guidelines.
Review comments &
assist
Construction Phase
Weekly Progress and
Schedule Meeting
Conduct weekly meetings to discuss schedule, change orders, new issues, submittal status, RFI's & safety.
Meeting agenda and
minutes
Deficiency Log Maintain a log of non-compliant work items. Deficiency Log Process Submittals Review and track all submittals for completeness & constructability. Submittal Approval Log Track Quantities Track quantities of completed/force account work for payment. List of Quantities Process Requests for
Information (RFI) Answer the Contractor’s RFI, ensure that the designer explains design RFI. RFI Logs Review Contract
Change Orders (CCO)
Review CCO's proposed by the contractor. Recommend needed CCO's. Track cash flow for CCO's.
Logs of potential and
issued CCO's
Claims Administration
Perform claims administration, coordination and monitoring claims, response preparation, logging claims, and tracking claims status.
Potential claims and
financial impact to the
City
Weekly Statement of
Working Days
Issue a Weekly Statement of Working Days, showing days remaining, and rainy days.
Weekly Statement of
Working Days
Environmental
Compliance
Review and enforce requirements stipulated in permits issued by regulatory and environmental agencies. Maintain/update the master ECR for project compliance. Reports & inspection Labor Compliance Monitor for compliance with the applicable labor laws and contract requirements, such as prevailing wage requirements.
Verify Certified Payrolls,
Wages, and Interviews
Progress Payments Review contractor's payment requests, verify completed quantities Certified Pay Request Project Documentation Maintain a project Uniform Filing System per Caltrans LAPM /Construction Manual “Project Documentation”.
Electronic files, project
files/logs
Project Schedule Review contractor's baseline, monthly, and "look-ahead" submittals. Notify all parties of deviations from the schedule.
Project Schedules,
Correspondence
Permits/Easement Utility
relocations
Continuation of pre-construction activities. Assist in coordination and scheduling of utility work.
Permits easements,
relocated utilities
SWPPP & Safety
Assist and review, approve and monitor of the Contractor’s SWPPP. Review, monitor, document and enforce contractor safety procedures for compliance with laws and regulations.
SWPPP Review, conduct
regular safety/tailgate
meetings
Disadvantage Business
Enterprise
Assure that the contractor is meeting disadvantage business enterprises goals established for the project.
Prepare Exhibit 9f of
Caltrans LAPM monthly
Quality Assurance /
Inspection
Inspect work to ensure compliance with contract documents. Reject unacceptable work using Deficiency Log. Observe the work of special inspectors when required.
Daily Inspection Reports.
NCR & Deficiency Log
Progress Photos Continue taking pictures to document the contractor's progress and any problems. Pictures labeled with a log
Community Outreach Respond to citizens and business owner’s concerns. Minimize complaints Survey Support Monitor survey requirements (As-Needed). Provide Quality Assurance
Daily Inspection Reports Document contractor’s daily operations and provides daily diaries. Daily Reports, field measurement
Traffic Control,
Closure Coordination
Review contractor’s traffic control and lane closure request, obtains CT closure approval, coordinate COZEEP, establish an agreement/contract with CHP’s.
Conduct regular safety/
tailgate meetings
Post Construction Phase
Final Inspection Conduct a final inspection/walk-through including maintenance and service personnel. Issue preliminary and final punch list. Coordinate with City and Caltrans.
Punch lists and Notice of
Completion
"As-Built" Drawings Review Contractor's redline drawings, submit to the designer. As-built redline drawings Dispute Resolution As requested, aids in resolving any outstanding disputes. Negotiation/ arbitration Project Files Deliver all project files including photographs. Complete Final Report and Funding Reimbursement application. Project files/e-files
Final Inspection Conduct a final inspection/walk-through including maintenance and service personnel. Issue preliminary and final punch list. Coordinate with City and Caltrans.
Punch lists and Notice of
Completion
Final Pay Request,
Certificate of Completion
Process the contractor's final payment request, issue a Certificate of Completion, obtain applicable permits and a Project Final Report.
Final Pay Request,
Certification of
Completion
RISK MANAGEMENT LOG
Our team members personally know the residents of the City of Downey and are very familiar with the City’s Projects. Our Senior Construction Inspector has performed a comprehensive review of the City’s upcoming projects. Our Team has prepared a risk management log which includes potential risks and response strategies based on the project scope and lessons learned.
No. Risk Description Response Strategy
1 Traffic Control/
Street Closure
Restriction
Z&K will ensure that project phasing is followed for lowest impact to businesses and public. Our team will review the traffic control plans to ensure they comply with the WATCH manual and MUTCD requirements. We will review it for minimum lane widths and as well as continuous and safe access for pedestrians. We will ensure temporary pavement markings are implemented.
Our team will work closely with the Contractor to provide advanced notice to first responders and essential services. A very robust but fluid traffic plan needs to be reviewed and approved. The final language in the traffic control must allow the city to direct the contractor to make adjustments to the approved traffic control plan as needed due to unanticipated traffic issues.
Contractor must have daily street sweeping for rocks and gravel on adjacent streets until the final process is completed. 2 Public/ Agency
Outreach
Due to the projects’ potential proximity to residences, Z&K will provide robust community outreach efforts prior to the start of construction that will inform both the residents in the vicinity of the project and commercial properties in the vicinity of the project the proposed start dates and completion dates of the project. Z&K will provide concierge-level service to the community and residents.
Ongoing contact and communication with local residents and business impacted by construction activity is crucial. This will include notification prior to the commencement of construction and throughout the entire process. Outreach will not be limited to minimum City requirements but will be a daily ongoing pursuit. Our team is very familiar with the community and will effectively navigate the significant coordination required. It is imperative that our community outreach does not only include property owners, business owners and residents, but also elected officials, management from the City, and all affected agencies.
3 Agency
Coordination
Our Team will ensure that all agencies affected by this Project are invited to the pre-construction conference and informed of the Project schedule and progress. Z&K will ensure that the Project complies with all permit requirements and environmental mitigation measures.
4 Requirements for
Response After
Hours or on Non-
Working Days
In previous projects, issues would arise after working hours or on weekends that would require the contractor to immediately respond and perform traffic control measure and/or street sweeping. Contacting and getting a response from the contractor after hours varied and was difficult for our team to enforce. We highly recommend adding language to the specifications outlining that the contractor shall respond to communication from Z&K and City staff immediately (including a maximum time allowed) and be available to respond immediately to after hour and non-working day requests (including a maximum time allowed). This is due to the type of time sensitive issues that arose during previous projects to have the contractor respond to resident concerns. We also recommend adding that if these times are not met, the city will contract with an emergency response team to be later back charged to the contractor.
5 Long Lead Item
Procurement
We will consider long lead items, material and equipment availability, special delivery, or construction requirements. Z&K has success on recent projects issuing an Administrative Notice to Proceed for the Contractor to begin on submittals for long lead items and submittals.
We will ensure the contractor begins process to order/procure possible long lead items or items that require coordination.
Long lead procurement items are to be identified in contractor’s CPM and closely monitored by the Team. The long lead items for projects may include traffic signals, electrical equipment, lighting, plumbing fixtures, etc. 6 Required Street
Sweeping
The Contractor shall submit a clear plan to provide street sweeping throughout construction. This plan should include the number of street sweeping machines as well as contingency plans for emergency after hours sweeping as needed. The Contractor shall defer to the inspector to make the final determination of street sweeping needs prior to the end of work hours. 7 Work Performed
near Schools, Parks,
Libraries, or
Emergency
Response Facilities
The projects may include construction work adjacent to schools, parks, libraries, and emergency response facilities. The community outreach and traffic control in these areas must be tailored and site specific.
We will ensure that the submitted traffic control plan for these areas is robust, accommodates school drop off and pick up and other stie specific requirements. More flagman or traffic control will be required for sensitive areas. Specific community outreach will be performed by Z&K to ensure that these facilities are kept up to date on construction activities. 8 Change Orders
To assist in controlling cost, Z&K will conduct a pre-construction site walk with City staff members to identify areas that could potentially result in unanticipated costs. During construction, Z&K will conduct site visits with City staff, as needed, to minimize change orders and cost increases.
Z&K will closely monitor the work and proactively manage the change order process. We will identify potential change orders early and proactively develop solutions.
9 Weekend
Work/Overtime
Requested by
Contractor
Due to unforeseen issues when scheduling manpower and materials, it may be necessary for the contractor to work evenings or weekends. This provision is important to minimize any additional costs to the City for the benefit of the contractor. All overtime shall be approved by the City prior to the commencement of work and all associated costs for inspection shall be at the expense of the contractor. This item shall be included as a discussion item in the pre-construction conference. 10 Delays Due to Other
Projects
Z&K will work closely with the City to ensure that other scheduled projects do not interfere with our project. We will also work closely with local agencies to ensure project schedule overlap and conflicts do not occur. 11 Public Safety
Z&K will work closely with the contractor to ensure that the Fire Department will be involved in the scheduling and planning stages for the streets. Law Enforcement will also be notified of all scheduled construction activity as this work will impact major traffic routes. All emergency responders will be notified of planned street closures in advance. 12 Pedestrian Access
During Construction The contractor is responsible to maintain pedestrian access around the project at all times. 13 Damage to Private
Properties
Damage to private property and vehicles occasionally occurs during construction activities. Community outreach shall include a procedure to notify Z&K immediately if any damage occurs.
FIRM EXPERIENCE
FIRM EXPERIENCE
Z&K Consultants, Inc. has successfully held over 50 similar staff augmentation contracts, including Inspection services, in the last 5 years. Z&K understands the nature of on-call contracts and has the depth of resources and expertise required to properly service those contracts. Z&K has managed on-call contracts throughout the region and has a strong understanding of how to effectively address project issues and the needs of public agencies, and we are keenly aware of community impact.
Z&K is proposing the same team that successfully delivered over 100 similar projects in the past 1 year alone. This Team works efficiently and with great comradery with City staff to achieve the community's goals. Z&K works proactively and diligently with City staff to successfully deliver projects under budget while mitigating numerous unforeseen delays. We understand the vital importance of community outreach in keeping the community informed with accurate project schedules and detailed outreach efforts.
We maintain an extensive history of working with various local agencies. Throughout the completion of many projects, our team has demonstrated an unparalleled ability to work well with local agency staff, project stakeholders, engineers, and contractors. We have successfully delivered projects in a timely and cost-effective manner and have acquired an understanding of local agency requirements.
Z&K team have worked on the following agencies performing similar services to deliver numerous public works projects on time and within budget.
» City of Alhambra
» City of Aliso Viejo
» City of Beaumont
» City of Bell
» City of Burbank
» City of Carson
» City of Chino
» City of Compton
» City of Corona
» City of Costa Mesa
» City of Eastvale
» City of El Segundo
» City of Hemet
» City of Irvine
» City of Irwindale
» City of Laguna Beach
» City of Lake Forest
» City of La Mirada
» City of Lancaster
» City of Manhattan Beach
» City of Moreno Valley
» City of Newport Beach
» City of Norco
» City of Norwalk
» City of Oceanside
» City of Palm Desert
» City of Pomona
» City of Rancho Pales Verdes
» City of Riverside
» City of Rosemead
» City of San Bernardino
» City of San Marino
» City of Santa Monica
» City of South Gate
» City of Temecula
» City of Torrance
» Caltrans
» County of Los Angeles
» County of Riverside
Transportation Department
» County of San Bernardino
» Long Beach Water
Department
» Riverside Public Utilities
With a large contingent of local resources to draw from, the Z&K project team can respond to whatever needs may arise. By effectively managing a balanced client workload among our staff, Z&K can respond promptly to meet with the City.
This helps keep the project momentum moving forward so that the Z&K team is in place and ready to work within days of receiving a Notice to Proceed. Consistent with our proven long-term approach to large municipal on-call contracts, Z&K has the technical expertise and experience to provide all project types as requested in the RFQ. Our Team will perform the work on the specified project for the entire duration of the project unless requested or approved by the City. We understand that no staff substitution is allowed. We will monitor our approved budget and notify the City additional work outside of contracted scope of work prior to performing such additional work.
Z&K’s keys to success on this staff augmentation contract includes our responsiveness, understanding of the City’s needs, capability and availability of qualified staff, and our historically successful comprehensive management approach for on-call, multiple-task, multiple-year contracts. Z&K will commit sufficient resources to adequately handle varying workloads that may result from multiple task orders progressing simultaneously, but technical strengths and resources are only of value if those resources can be well managed. The Z&K approach to effective project management starts with scope, schedule, and budget development, signed contracts, and kickoff meetings.
The project management concepts for the duration of each task and the overall contract are then organized around a core framework of communication, coordination, thorough documentation, and quality control for each submittal on each task.
All proposed staff possess the certifications and licenses required to provide Construction Inspection services.
Our staff licenses include registered civil engineers, traffic engineers, QSD/QSP, ICC Certified in all trades, certified plan reviewers, and Certified Building Officials for building projects. Our team has specialized inspection training. The Z&K team understands the importance of meeting deadlines in a timely manner. We commit to providing adequate staffing (both as to number of personnel and their qualifications) for every task. Our approach is flexible and adaptive to each task, and we can also commit to making use of personnel from other offices throughout the company and bringing on additional staff.
Our staff shall ensure that all work conforms with applicable City, State and Federal laws, latest versions of City Design Manuals, City Standard Plans, Caltrans manuals and policies, Caltrans Standard Plans and Specifications, APWA Standard Specifications for Public Works Construction “Greenbook”, Manual of Uniform Traffic Control Devices and California Building Codes, all as revised and amended.
Z&K has successfully
held over 50 Staff
Augmentation Contracts providing
similar services in the
last 5 years.
CURRENT ON-CALL CONTRACTS
MUNICIPAL AGENCY SERVICES PROVIDED CONTRACT
TERM
1 City of Alhambra On-Call Construction Management and Inspection Services 2023 - 2025 2 City of Beaumont* On-Call Public Works Inspection 2017 – 2024 3 City of Beaumont* On-Call Project Management Services 2017 – 2024 4 City of Beaumont* On-Call Construction Management Services 2017 – 2024 5 City of Bell On-Call Project Management Services 2022 - 2025 6 City of Bell On-Call Construction Management, and Inspection Services 2022 - 2025 7 City of Carson On-Call Construction Management and Inspection Services 2023-2026 8 City of Carson On-Call Project Management Services 2023-2026 9 City of Chino* On-Call Project Management Services 2020 – 2025 10 City of Chino* On-Call Construction Management Services 2022 – 2025 11 City of Chino* On-Call Inspection Services 2020 – 2025 12 City of Corona* On-Call Public Works Inspection Services 2020 – 2023 13 City of Corona* On-Call ADA Inspection Services 2020 – 2023 14 City of Costa Mesa On-Call Public Works/Engineering Staff Support Services 2023-2026 15 City of Eastvale On-Call Construction Management Services 2022 – 2025 16 City of Eastvale On-Call Public Works Inspection Services 2022 – 2025 17 City of Eastvale On-Call Project Management Services 2022 – 2025 18 City of El Segundo On-Call Construction Management & Inspection Services 2022 - 2025 19 City of Hemet On-Call Project Management Services 2022 - 2025 20 City of Hemet On-Call Construction Management & Inspection Services 2022 - 2025 21 City of Irwindale* On-Call Construction Management Services 2022 – 2025 22 City of La Mirada On-Call Construction Management Services 2023-2026 23 City of Laguna Beach On-Call Construction Management and Inspection Services 2023-2025 24 City of Lake Forest On-Call Construction Management and Inspection Services 2019 - 2025 25 City of Lancaster On-Call Construction Management and Inspection Services 2021 – 2024 26 City of Manhattan Beach* On-Call Construction Management Services 2023 – 2026 27 City of Manhattan Beach* On-Call Project Management Services 2022 – 2025 28 City of Moreno Valley On-Call Construction Management and Inspection Services 2019 – 2024 29 City of Newport Beach On-Call Project Management Services 2023 – 2026 30 City of Norco On-Call Professional Inspection Services for the Building Department 2021 – 2024
31 City of Norco* On-Call Construction Management and Inspection Services (PW) 2021 – 2024 32 City of Oceanside* On-Call Construction Management Services 2019 – 2024 33 City of Oceanside* On-Call Project Management Services 2019 – 2024 34 City of Palm Desert On-Call Construction Management and Inspection Services 2023-2025 35 City of Pomona On-Call Construction Management and Inspection Services 2021 – 2024 36 City of Rancho Pales
Verdes On-Call Construction Management Services 2022 – 2025 37 City of Riverside On-Call Construction Management and Inspection Services 2023 - 2026 38 City of Rosemead On-Call Construction Management and Inspection Services 2021 - 2024 39 City of San Bernardino* On-Call Public Works Inspection Services 2019 – 2023 40 City of San Bernardino* On-Call Project Management and Construction Management 2019 – 2023 41 City of San Marino On-Call Construction Management and Inspection Services 2019 - 2025 42 City of Santa Monica On-Call Construction Inspection Services 2020 - 2026 43 City of South Gate On-Call Construction Management and Inspection Services 2019 - 2025 44 City of Temecula On-Call Construction Management Services 2019 – 2024 45 City of Torrance On-Call Construction Inspection Services 2021 - 2024 46 County of Los Angeles On-Call Construction Management and Inspection Services 2019 – 2024 47 RCTD* On-Call Construction Management and Inspection Services 2022 – 2025 48 San Bernardino County On-Call Construction Management and Inspection Services 2022 – 2025 49 Long Beach Utilities* On-Call Program, Project, and Construction Management Services 2021 – 2026
50 Los Angeles County PW On-Call Engineering and Project Management Support Services 2022 - 2025 *Multiple Contract Extensions
FIRM EXPERIENCE
In addition to our similar staff augmentation contracts, the Z&K Team has successfully performed Inspection services for projects for numerous public agencies. The following projects have been completed on time and within budget.
TRANSPORATION PROJECTS
CITY OF EL SEGUNDO | EL SEGUNDO BOULEVARD IMPROVEMENT PROJECT, PW 23-02 The Z&K Team is providing Project Management, Construction Management, Construction Inspection, Pre-Construction Inspection, and Contract Administration Services for this project, which involves the following: rehabilitate existing pavement along El Segundo Boulevard between Illinois Street and Isis Avenue; and rehabilitation along Nash Street, between El Segundo Boulevard and Imperial Highway. Several options of pavement rehabilitation were considered, and the recommended option would include cement stabilized base with an asphalt overlay. This option will include detours and consequently will cause delays along El Segundo Boulevard during the construction. Install curb ramps on El Segundo Boulevard at Illinois Street, Continental Boulevard, Nash Street, Douglas Street, and Aviation Boulevard intersections. Install curb ramps on Nash Street at Grand Avenue, Mariposa Avenue, Maple Avenue, Atwood Way, a midblock crosswalk, and Imperial Highway intersections. Install approximately 1,020 lineal feet of “cycle track” from PCH to Continental on El Segundo Boulevard, install approximately 27,450 lineal feet of Class II Bike Lanes from Aviation Boulevard to PCH, on Douglas Street between Rosecrans Avenue and Imperial Highway, on Nash Street between El Segundo Boulevard and Imperial Highway, and install suitable shared Class III Bike Route markings (“Sharrows”) in the nearby area where applicable.
CITY OF LAKE FOREST | STREET RESURFACING OF GLENN RANCH ROAD FROM PORTOLA TO EL TORO AND
PRE-CONSTRUCTION INSPECTION SERVICES FOR SLURRY SEAL ZONE F AND ARTERIAL SLURRY SEAL
JERONIMO AND MUIRLANDS FROM LOS ALISOS TO BAKE
The Z&K Team is providing Project Management, Construction Management, Construction Inspection, Pre-Construction Inspection, and Contract Administration Services for these projects, which involves the street resurfacing and the slurry seal. Relevant project features include street resurfacing and rehabilitation, application of slurry seal, grinding and overlay, cold milling, concrete improvements, ARHM pavement, AC base course, aggregate base, signing, striping, markings and pavement legends, removal and replacement of PCC curb ramps, removal and replacement of PCC sidewalk, bike lane traffic loops, Type E traffic loops, dig-outs, sewer and storm drain manhole adjustments, and water valves adjustments.
CITY OF COSTA MESA | CITYWIDE PARKWAY MAINTENANCE & STREET REHABILITATION PROJECT Z&K Consultants, Inc. is providing Construction Management, Construction Inspection, and Project Management Services for this citywide street improvement program in the City of Costa Mesa. This project includes street improvements, intersection improvements, ADA ramp improvements, conduit installation, traffic signal improvements, mobilization, curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, adjustment of manholes and utility covers to grade, procurement and application of slurry seal Type II, crack sealing, traffic signing, striping and markings, installation of traffic markers and speed humps, and implementation of traffic control.
CITY OF CHINO | SLURRY SEAL PROGRAM (VARIOUS LOCATIONS CITYWIDE) Z&K Consultants Inc. is providing Project Management, Construction Management, and Inspection oversight services for this Project which includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits, Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pavement improvements, street resurfacing, crack sealing, slurry seal, localized dig-outs, striping removal/install, and traffic loop detectors.
CITY OF CHINO | ALLEY/SANITATION REHABILITATION PROJECT Z&K Consultants Inc. is providing Project Management, Construction Inspection, and Construction Management for this Project which includes removal of existing alley pavement and base section to construct new AC pavement section and ribbon gutter in multiple alleys in the City of Chino. Scope of work includes new PCC drive and alley approaches, curb and gutter, 4’ PCC alley gutter, new AC pavement section and the construction of several block walls.
CITY OF SAN BERNARDINO | STREET REHABILITATION PROGRAM (30+ MAJOR CITY STREETS) Z&K Consultants, Inc. is providing Project Management, Construction Management and Inspection Services for this long- term, on-call contract with the City of San Bernardino, which includes street resurfacing and pavement rehabilitation for over 30 major streets and multiple major street intersections in the City. The projects include roadway and pavement rehabilitation, concrete improvements, cross gutters, curb and gutters, curb ramps, ADA improvements, storm drain and pipeline relocation, traffic signal improvements, traffic control, full depth removal and replacement of asphalt concrete, cold milling and AC overlay of existing asphalt concrete, slurry seal application PCC sidewalk, replacement of existing PCC driveways, driveway approaches, curb ramps, retaining curbs, 3’ high retaining wall, parkway culverts, cross gutters, asphalt-concrete pavement, removal and replacement of trees, clearing and grubbing, installation and configuration of multiple traffic loop detectors and bicycle traffic loop detectors, installation of city project signs, preservation of existing city survey monuments, adjusting manhole and utility covers to grade, reconfiguration and installation of street lighting, and installation of pavement markings and striping.
Z&K has successfully delivered over 60 street improvement projects over the past 5 years.
CITY OF COMPTON | ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT, PHASE 1 & PHASE 2A Z&K Consultants, Inc. is providing Project Management, Construction Management, Inspection, and Labor Compliance services for this Project. The scope of work consists of roadway and pavement rehabilitation, concrete improvements, asphalt overlay, construction staging, heavily travelled intersections, traffic control, clearing and grubbing, SWPPP preparation, cold mill and overlay, PCC sidewalk, manholes and utility covers, speed humps, pedestrian crossings, ADA improvements, slurry seal application, HMA pavement, ARHM overlay, AC base course, aggregate base, full depth AC slot pavement, alley intersection, driveway and driveway approach, landscaping, irrigation, adjusting manhole and utility covers to grade, water valve, water meter, street lighting, installation of loop detectors, traffic signal modification, adjustment of streetlight and traffic signal pull boxes to grade. (Two Separate Projects) CITY OF SAN MARINO | STREET REHABILITATION PROGRAM PHASE 1 & PHASE 2 Z&K Consultants, Inc. provided Project Management and Construction Inspection Services for this program, which consisted of citywide roadway pavement rehabilitation. The program’s improvements included construction of roadway and pavement rehabilitation, concrete improvements, cross gutters, curb and gutters, curb ramps, ADA improvements, cold-milling asphalt concrete pavement and re-paving with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM), clearing and grubbing, , localized pavement repairs, replacing impacted traffic striping, markings, pavement legends, loop detectors, curb painting, driveways and driveway approaches, installing speed humps, adjusting utility frames and grates, and storm drain manholes, preparation and implementation of SWPPP, and providing temporary traffic control. (Two Separate Projects) CITY OF NORWALK | CDBG LOCAL STREETS REHABILITATION PROJECT Z&K Consultants, Inc. is providing Construction Management and Inspection services for the Local Streets Rehabilitation Project, funded by the Community Development Block Grant (CDBG) fund. The scope of work includes improvements to concrete appurtenances, including cross gutters, curb and gutters, upgrades of curb ramps to ADA standards, and intersection improvements, traffic signal improvements, bike lanes, underground utility coordination, conduit installation, and rehabilitation of roadway pavement conditions.
CITY OF ROSEMEAD | WALNUT GROVE AVE. RESURFACING PROJECT, PHASE I Z&K Consultants, Inc. is providing Project Management, Construction Management and Inspection Services for this project, which involves street resurfacing of Walnut Grove Ave., from Marshall St. to Grand Ave. in the City of Rosemead. In addition to street improvements, the project included intersection improvements, removal and replacement of existing AC pavement, cold mill and overlay, asphalt pothole repairs, replacement of PCC sidewalk, removal and replacement of ADA ramps, curb and gutter, bike lane and bike trail, traffic signal modifications, installation of medians, adjustment of manholes and utility covers to grade, installation of specialty and bicycle loop detectors, pedestrian crossings, and roadway markers.
CITY OF ALHAMBRA | FY 19-20 & 20-21 STREET REHABILITATION PROJECTS The Z&K Team is performing Project Management, Construction Management, Construction Inspection, and Labor Compliance Services for this project, which consists of the pavement and street rehabilitation of 23 local street segments.
Improvements include street resurfacing, slurry seal treatment, varying depths of cold mill and overlay, construction staging, full depth removal and reconstruction, concrete improvements such as removal and replacement of broke and off-grade sidewalk, ADA ramps that need updating, broke and off-grade curb and gutter, PCC sidewalk, installation of loop detectors, driveway aprons in need of repairs, and concrete cross gutter reconstruction. (Two Separate Projects) CITY OF TORRANCE | RESIDENTIAL & ARTERIAL PAVEMENT IMPROVEMENT PROJECT, I-159/I-139 Z&K Consultants, Inc. is providing Project Management, Construction Management and Construction Inspection services for this project, which consists of pavement improvements to a residential neighborhood and four arterial streets.
Improvements include roadway and pavement rehabilitation, concrete improvements, cross gutters, curb and gutters, curb ramps, ADA improvements, clearing and grubbing, application of slurry seal, cold mill and AC overlay, removal and disposal of existing pavement, localized pavement repairs, as well as tree removals and replacements, asphalt berm replacement, AC base course, PCC sidewalk, PCC driveways and driveway approaches, access and ramps, replacing pavement markings and striping on concrete and asphalt, and installation of raised pavement markers and City project signs.
CITY OF IRWINDALE | 2021-2022 RESURFACING PROJECT: RESIDENTIAL RESURFACING PHASE I Z&K provided Construction/Project Management and Inspection for this project. The project included street resurfacing, traffic control, raised crosswalks, speed humps, cold milling and AC overlay of existing asphalt concrete, construction of new curb and gutter, PCC sidewalk, installation and configuration of multiple traffic loop detectors, installation of city project signs, preservation of existing city survey monuments, adjusting manhole and utility covers to grade, installation of pavement markings and striping. Related work includes mobilization, traffic control, assisting in preparation of NPDES, local utility coordination, construction management, daily inspection, labor compliance, geotechnical and materials testing coordination.
CITY OF TORRANCE | ANZA/VISTA MONTANA/PACIFIC COAST HIGHWAY INTERSECTION IMPROVEMENTS Z&K Consultants, Inc provided Project Management and Inspection services for the Anza/Vista Montana/Pacific Coast Highway Intersection Improvements Project. This Project consists of construction of the Pacific Coast Highway/Anza Intersection Improvements with appurtenances as shown on City of Torrance Plan No.’s ST-1019/SD-517/C- 2019-8/TS- 2019-2/ST-1019-TC; curb, gutter, sidewalk, catch basins, curb ramps, raised medians, striping, traffic signal replacement; grind and overlay, and AC pavement; and all other incidental work in this specification document.
ENTERPRISE (WATER, SEWER, STORM DRAIN, AND SANITATION)
CITY OF LAGUNA BEACH | JASMINE STREET STORM DRAIN IMPROVEMENTS CIP NO. 154 Z&K Consultants, Inc is providing Construction Inspection Services for this project for the City of Laguna Beach. The project includes the installation of approximately 2,400 linear feet of storm drainpipe; including the jacking of one 28-inch steel casing and the installation of a 24-inch PVC pipe within the casing beneath North Coast Highway. The work also includes the installation of a Low-flow diversion with a 12-inch PVC pipe, the installation and/or replacement of catch basins, and connecting storm drain laterals at various locations along the project alignment, trenching, the removal and replacement of A.C. pavement and P.C.C. street improvements as required to install storm drain facilities, jacking of 28-inch steel casing, striping, pavement markings, pavement markers, and traffic control.
CITY OF VERNON | 50th STREET WATER MAIN REPLACEMENT PROJECT The Z&K Team is providing Project Management and Inspection Services this Project. The project’s scope of work includes demolition and reconstruction of the 12” iron ductile pipeline and all associated renovations to the City’s existing water services, such as installation of all appurtenances, fittings, valves, blow-offs, siphons, concrete pipe supports, thrust blocks, trenching, bedding and backfill, replacement of traffic markings, shoring, over excavation, fill re-grade, temporary and permanent pavement, steel plating, and roadway improvements and repair.
CITY OF NORWALK | ALONDRA BOULEVARD, PIONEER BOULEVARD, AND 160TH STREET WATER MAIN
INSTALLATION PROJECT
Z&K provided Construction Inspection for this project. The pipeline is 12-inch ductile iron pipe class 350 including fittings, bends, wyes, tees, reducers, adaptors, warning tape, tracer wire, and appurtenances. Project includes abandoning in-place and removal of the existing water mains, filling, flushing and connecting to existing water mains, excavation, trenching, backfill, compacting and restoration of the surface, asphalt paving, 12-inch gate valves, tapping sleeve and valve, meters, installing domestic services, and replacing sidewalk, driveways, curb and gutter, and traffic striping and markers.
CITY OF FULLERTON | LONGVIEW DRIVE WATER/SEWER MAIN REPLACEMENT & STREET IMPROVEMENTS The Z&K Team is providing Construction Management and Inspection Services. This water, sewer, and street rehabilitation project for the City of Fullerton included replacing 2,500 LF of an 8-inch ductile iron pipe water main, as well as 2,500 LF of 8-inch vitrified clay pipe (VCP), PVC SDR 26 sewer main, installation of new manholes, removal and replacement of existing sewer and video inspection and abandoning existing water mains and valves. Inspectors provided oversight during operations including pipe welding, trench excavation, shoring, backfill, traffic control operations, and replacement of traffic signals, signing, and striping. The project also included street and drainage improvement work, which included asphalt paving, concrete paving, curb and gutter, access ramps, cross gutter, driveway approach and sidewalk replacement.
LBWD | LADWP HAYNES GENERATING STATION RECYCLED WATER PIPELINE & SEWER PIPELINE PROJECT Z&K is providing Inspection services for the 24-inch diameter water pipeline. Approximately 7,940 LF and construction estimate of $14M. Pipeline begins at Haynes Generating Station and connect to LBWD 21-inch recycled water pipeline at Atherton Street and Studebaker Road. Project requires extensive coordination with City of Long Beach upcoming public works projects. Project required CEQA, Caltrans permitting, California Coastal Commission, and coordination with LADWP.
It is approximately 12,930 LF. The pipeline has many crossings, is within Caltrans, SCE, LADWP, and LACFCD right-of- way, and has a perpendicular crossing through SCE right-of-way that will require CPUC.
CITY OF CHINO | YORBA AVENUE & EUCALYPTUS AVENUE SEWER MAIN REPLACEMENT PROJECT Z&K is providing Project Management, Construction Inspection, and Construction Management services for this Project.
This Project includes the replacement of an existing 10-inch vitrified clay sewer pipe along Yorba Avenue between Murrieta Street and Cheyenne Way. There are two industrial businesses discharging wastewater with combined volumes of approximately 400,000 GPM, when compliant. This number can reach up to 500,000 GPM when non-compliant and causes existing pipes to reach nearly 75% capacity. The project includes an independent sewer flow study to assist the City in a decision to remove and replace or add additional sewer line(s) at these locations.
CITY OF CHINO | CENTRAL AVENUE AND DUPONT AVENUE WATERLINE REPLACEMENT PROJECT Z&K is providing Construction Management and Inspection services for this Project. The Central Avenue project includes the replacement of a 16” steel to an 18” PVC water main on Central Avenue from Chino Avenue to C Street. The Project will also include the replacement of an 8” steel line on D Street pipe from Central Ave to the alley west of 6th Street.
CITY OF CHINO | STATE STREET WATER TREATMENT PROJECT
Z&K is providing Project Management and Construction Inspection services for this Project. This project includes the construction of a centralized water treatment plant (WTP) at the City’s Reservoir 5 and Well 14 sites. The proposed project is anticipated to include cartridge filters, GAC, IX, and chlorination equipment for a total treatment capacity of 4,000 gpm.
In addition, the project includes a 3,800 LF brine disposal pipeline connecting to the Non-recoverable Waste System operated by IEUA and LA County Sanitation, a connection to the City of Montclair sewer system, and a 7,000 LF raw water transmission main from Well 12 to the State Street site. Both Well Pump 12 and Well Pump 14 will be replaced as part of the treatment improvements.
Z&K has successfully provided CA/CI Services for over 40 water, storm drain, and sewer projects over the last 5 years.
CITY OF OCEANSIDE | SAN LUIS REY (SLR) WASTEWATER TREATMENT PLANT PROJECT The Z&K Team is providing Construction Management and Inspection Services as a subconsultant for the SLR Wastewater Treatment Plant and Aeration Basin Effluent Piping Replacement project located at the San Luis Rey Wastewater Reclamation Facility. The project scope of work includes the removal and replacement of six (6) 24-inch aeration basin effluent piping, including the installation of new plug valves, fittings, pipe, wall penetrations and installations of gate valves and flow meters or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents.
VICTORIA AVENUE RECHARGE WATER FACILITY | WESTERN MUNICIPAL WATER DISTRICT The Z&K team provided Construction Management and Inspection Services for this major capital improvement project for WMWD. This project includes the installation of new groundwater extraction wells to help increase the groundwater basin quantity and improve its quality. Major improvements on this project include mass grading operations, installation storm water basins, a divergent structure, two concrete trapezoidal rerouting channels into the water basin, storm water collection structure, the installation of 4000 linear feet of 20” reclaimed water pipeline three local city streets connecting the gage canal reservoir into the three proposed storm water basins.
CITY OF BEAUMONT | WASTEWATER TREATMENT PLANT EXPANSION & BRINE PIPELINE PROJECT The Z&K Team provided Construction Management and Inspection Services for this project. Per the City’s NPDES Permit, once flows at the WWTP reached 75% of the permitted capacity, the City is required to begin the planning, design and funding process to expand the plant. In addition to the need for more capacity to serve the City’s growing customer base, the City is mandated by the Regional Water Quality Control Board (Regional Board) to upgrade its WWTP to meet groundwater basin objectives. The City of Beaumont’s Wastewater Treatment Plant (WWTP) Expansion/Renovation Project includes increased the permitted capacity from 4 MGD to 6 MGD.
CITY OF CHINO | KIMBALL AVENUE STORM DRAIN IMPROVEMENTS AT CHINO AIRPORT The Z&K Team is provided Project Management, Construction Management, and Inspection services for the City of Chino for this project. This project included removing and disposing of existing landscaping, PCC and AC pavement, constructing AC pavement over compacted base, PCC sidewalk, curb and gutter, installing box culvert storm drain structure with wingwalls, catch basin, stormwater infiltration system, steel encased water lines and various types water lines and facilities, coordination with various utilities for their installations. Additional improvements were relocating new traffic signal boxes, paving AC dikes, water services, clearing and grubbing, installation of rip rap and grouted rip rap, installation of box culvert wingwall pairs of reinforced concrete, installation of precast segment box culvert, 30” and 24” steel pipe, ductile iron pipe, water main installation and testing, curb, gutter, ADA ramps, and fencing. This project was completed ahead of schedule before extensive rain events that would have caused Kimball Ave to be shut down. Due to this project completion, Kimball Ave was operational during major storm events.
CITY OF CHINO | STORM DRAIN AND PUBLIC IMPROVEMENTS FOR COMMERCIAL DEVELOPMENT OF
INDUSTRIAL TILT-UP BUILDINGS
The Z&K Team is provided Construction Management and Inspection services for the City of Chino for this Project. This project included over 2.5M square feet of building pads. Installation of over 4500 LF of a combination of RCP and HDPE storm drainpipe ranging in size from 18” to 108”. Construction of 26 PCC reinforced storm drain structures. Installation of over 2300 LF of a combination of PVC and CML&C domestic water main ranging in size from 4” to 12”. Installation of over 1600 LF of PVC recycled water main. Installation of over 1300 LF of VCP sanitary sewer ranging in size from 6” to 8”.
Construction of 5 sanitary sewer manhole structures. Installation of a sewage lift station including 1100 LF of 4” HDPE force main. Construction of 16 streetlights. Construction of 1260 LF of full street improvements (44’ width). Reconstruct 1200 LF of 56’ wide street including cement treatment of existing soils. Z&K performed inspections on mobilization, construction staging, SWPPP and erosion control, inspecting for compliance with traffic control plans, attending progress meetings, reviewing submittals, quality control/inspection, safety, as built drawings, final walk-through, and project completion reports.
PARK AND FACILITY PROJECTS
CITY OF SOUTH GATE | HOLLYDALE COMMUNITY PARK IMPROVEMENTS PROJECT The Z&K Team provided Project Management, Construction Management and Inspection services for the City of South Gate’s Hollydale Community Improvement Project. The project involves the renovation of Hollydale Community Park which is located at 12119 Industrial Avenue, in the City of South Gate. The Project improvements include a new community center, new lighting and electrical systems, concrete improvements, stormwater chambers, new irrigation system and landscaping, site furniture, new playground and exercise equipment, basketball court, block wall fence, construction of a new 1,675 SF community building and other miscellaneous work.
Z&K has successfully delivered over 35 parks and facility projects serving in a similar capacity over the past 5 years.
CITY OF IRWINDALE | IRWINDALE PARK IMPROVEMENTS PROJECT PHASE IV & V The Z&K Team is providing Project Management, Construction Management, Inspection services, Labor Compliance Oversight, and Construction Surveying Services for the City of Irwindale’s Irwindale Park Improvements Project. The Project improvements include demolition of existing concrete walks, concrete footings, planters, and existing roofing and framing.
The work includes drainage structures, drainage line installation, site grading, fine grading, installing concrete walks. The electrical work consists of removal of the designated existing lights, including their bases, and removing and disconnecting the existing lights in the structures that will be worked on. The architectural and structural work consists of the building of new roofed BBQ/picnic shelter 1 (approx. 1,635 sf), the building of new roofed picnic shelter 2 (approx. 1,164 sf), remodel of existing restroom 1 (approx. 569 sf), and remodel of existing restroom 2. The irrigation work in Phase IV & V areas (~70,000 sf) includes installation of new points of connection, installation of new controllers, and maintaining the delivery of irrigation to the existing plants during the construction period. Z&K is providing contract administration, construction management, inspection, utility coordination, labor compliance, public outreach, and project close-out. Z&K provided a full comprehensive constructability review performed by the CM team.
CITY OF SOUTH GATE | CIRCLE PARK REHABILITATION PROJECT The Z&K Team is providing Project Management, Construction Management, Inspection services, Labor Compliance Oversight, and Construction Surveying Services for the City of South Gate’s Circle Park Rehabilitation Project. The scope of work to be done consists of the renovation of the existing park, grading, installation of a new playground plaza, Water Play area, picnic shelters and tables, basketball court, Pickle Ball court and a Futsal court, new irrigation system and landscaping with drought tolerant plants, new lighting system, DG walking path, park benches, picnic tables, concrete sidewalk, curb and gutter, curb ramps, AC pavement, and other related items that are required by the Contract Documents.
Z&K is providing contract administration, construction management, inspection, utility coordination, labor compliance, public outreach, geotechnical and material testing services, and project close-out. Z&K provided a full comprehensive constructability review performed by the CM team.
CITY OF HEMET | GIBBEL PARK ALL WHEEL SKATE PARK
The Z&K Team is providing Construction Management and Inspection services for the City of Hemet’s Gibbel Park All Wheel Skate Park Improvement project. Relevant improvements within the project include constructing a skate park, landscaping, irrigation, rough and precise grading, new lighting, concrete improvements, fencing, installing a shade sail, constructing 18” x 18” concrete capped seat walls with board-deterrent notches, installation of catch basins, piping and bedding, pretreatment devise and dry well, and demolition. Z&K is providing contract administration, construction management, inspection, utility coordination, labor compliance, public outreach, geotechnical and material testing services, and project close-out. Z&K provided a full comprehensive constructability review performed by the CM team.
CITY OF COSTA MESA | JACK HAMMETT SPORTS COMPLEX IMPROVEMENT PROJECT The Z&K Team is providing Construction Management and Inspection services for the City of Costa Mesa’s Jack Hammett Sports Complex Improvement project. Relevant improvements within the project include sports field construction, synthetic turf installation, concrete improvements, parking lot improvements including increase of parking and improved circulation, ADA improvements, electrical runs to the pull boxes for storage buildings within the complex, construction of retaining walls, block wall fencing, replacement of lighting system, irrigation improvements, landscaping, rough and precise grading, foundation improvements, construction and installation of two new storage buildings, and all electrical and mechanical work within the buildings.
CITY OF LAKE FOREST | ARBOR MINI PARKS, VINTAGE AND SUNDOWNER PARKS, BORREGO OVERLOOK, REGENCY, AND RANCHO SERRANO PARKS (SIX (6) PARK IMPROVEMENT PROJECTS) Z&K Consultants provided Construction Management, Construction Inspection, and Contract administration for the Arbor Mini Parks and Neighborhood Park Renovations, which includes Borrego Overlook, Regency, Rancho Serrano, Sundowner, and Vintage Parks. This program includes improvements such as removal of existing hardscape, installation of new landscaping and irrigation, installation of block wall and iron fencing around perimeter of park sites, installation of new playground equipment and park amenities, construction of ADA compliance ramps, erosion control, storm drain construction, construction of concrete walkways and exercise trails, installation of exercise equipment, installation of barbecues, picnic tables, park lighting system and electrical system, installation of drinking fountains, installation of shade structures, rubber surfacing, and concrete loop walkways.
CITY OF TUSTIN | VETERANS SPORTS PARK AT TUSTIN LEGACY
Z&K Consultants provided Construction Management and Construction Inspection Services as a subconsultant for the City of Tustin’s Veterans Sports Park at Tustin Legacy. This park is the City of Tustin’s largest park carved from 31.5-acres. It is bounded by Lansdowne Road, Valencia Avenue, and Severyns Road. This project is 100% locally funded, utilizing several funding sources. Phase 1 of the construction for the Veterans Sports Park is complete and consists of demolition, grading, storm drain, water, reclaimed water, and sanitary sewer installation. The sports park contains a wide variety of recreational facilities such as softball, soccer, tennis, basketball, racquetball, sand volleyball and pickleball. The park includes a passive recreation area, fitness stations, concession/restroom/storage buildings, a veteran’s memorial feature, skate plaza, a parking lot, and a children’s play environment. Additional relevant park features include lighting installation, retaining walls, synthetic turf, outlet structures, outdoor seating areas, ADA compliant ramps and concrete walkways, ADA compliant parking lot spaces, landscaping, and water features.
CITY OF LYNWOOD | YVONNE BURKE – JOHN HAM PARK COMMUNITY CENTER Z&K Consultants provided Construction Management and Inspection Services for this new 8,645 SF community center and park. The project includes building improvements, such as a kitchen, multipurpose rooms, administration offices, restrooms, game room, concession room, as well as improvements to the park, such as landscaping, irrigation, retaining walls, block wall fencing, site lighting, concrete walkways, water features, outdoor exercise stations, a natural grass baseball field, outdoor basketball court, covered picnic and barbecue areas, playground equipment, public restrooms, a ¾ mile ADA accessible walkway, outlet structures, and paving improvements. The building is utilizing a dual plumbed system and the site is using reclaimed water for irrigation. The project has required close coordination with SCE, Region Water Quality Control Board, and Los Angeles County Department of Public Health.
CITY OF LA QUINTA | SILVERROCK PARK VENUE SITE
Z&K provided Construction Management and Inspection Services for this Project, which sits on approximately 14 acres with approximately eight (8) acres of walking paths, turf, and landscaping. Construction work included precise grading, hardscape, landscaping and irrigation, stream and lake construction, furnishing and installation of lighting, decomposed granite parking lot construction, concrete ADA parking space construction, concrete and decomposed walkways, construction of a stage, installation of playground equipment, picnic and BBQ areas, park lighting, construction of an outdoor theater with seating area. Project included traffic control, dust control, SWPPP, 6” PCC paving, 6” concrete vertical curb, 4” concrete rolled curb, over 70,000 SF of decomposed stabilized granite, concrete cross gutter, parking lot signage and striping, ADA curb ramps, ADA parking stalls, fire line, water line, headwalls, and rip rap, drinking fountains, parking lot lighting, and landscaping.
CITY OF SAN BERNARDINO | SECCOMBE LAKE PARK AND PERRIS HILLS PARK The Z&K Team provided Construction Management and Inspection services for this project, which involved improvements to Seccombe Lake Park and Perris Hills Park. Z&K personnel performed constructability reviews of the project plans and specifications prior to the bid release. The project includes grading, fencing, new CMU restroom buildings, and ADA parking space construction. The project also includes landscaping and irrigation improvements, ADA sidewalk improvements, installation of playground and exercise equipment, installation of horseshoe pits, improvements to a baseball diamond, playground areas, picnic and barbecue areas, and installation of several benches.
CITY OF SAN BERNARDINO | PLAYGROUND EQUIPMENT REPLACEMENT FOR SIX PARKS The Z&K Team provided Construction Management and Inspection services for this project, which consisted of park improvements to six community parks in the City of San Bernardino. Parks that received improvements included Jack Reilly Park, Encanto Park, Gutierrez Park, Colony Park, Delmann Heights Park, and La Plaza Park. Z&K oversaw the replacement of playground and exercise equipment, installation of block wall fencing, grading, irrigation and landscaping improvements, construction of a basketball courts and other sports fields, installation of barbecue and picnic areas, ADA accessible curb ramps and walkways, storm drain construction, and various concrete improvements. Z&K managed and coordinated all aspects of the project, performed pre-construction services, coordinated field meetings and construction progress meetings, reviewed and approved contractor’s construction schedule, monthly accounting of construction costs, reviewed shop drawings, processed submittals and requests for information, performed labor compliance and certified payroll review, participated in public outreach activities, provided inspection of project activities, ensured compliance with approved PS&E, city standards, and Greenbook standards, coordinated materials testing services, coordinated with utility companies.
CITY OF SAN BERNARDINO | NICHOLSON NEIGHBORHOOD PARK IMPROVEMENTS PROJECT The Z&K Team is provided Project Management, Construction Management, and Inspection services for the City of San Bernardino for this project. Project improvements include park rehabilitation, clearing and grubbing, tree removal, open play fields, unclassified excavation and unclassified fill, stormwater infiltration system, storm drain improvements, signage, traffic control, detours, phasing plans, demolition, grading, ADA ramps, sidewalk, new parking lots, play areas, new concrete walkways, concrete paving, ballfields, picnic shelters, restroom/concession building, site furnishing, drainage, landscaping, light poles, fixtures, pull boxes, footings, switchboards, tubular steel fencing, mow curb, seat walls, double swing gates, accent pilasters, accent walls, drinking fountains, chain link gates, benches, trash enclosures, BBQ grills, bike racks, exercise stations, park monuments, playground equipment, driveway approaches, curb and gutter, ADA parking stalls, landscaping, irrigation, sod, basketball court surfacing, snack bars, restrooms, equipment rooms, new trees, turf, and shrubs, Southern California Edison coordination, picnic shelters, shade structures, steel trellises, walking/running trails, sports courts, amphitheaters, planting, lighting and security, striping and signage, utility improvements, utility relocations, traffic control, telecommunications, public facilities improvements, on-site development improvements, Stormwater Pollution Prevention (SWPPP), and ADA Improvements.
CITY OF HEMET | GIBBEL PARK ALL WHEEL SKATE PARK
The Z&K Team is providing Construction Management and Inspection services for the City of Hemet’s Gibbel Park All Wheel Skate Park Improvement project. Relevant improvements within the project include constructing a skate park, landscaping, irrigation, rough and precise grading, new lighting, concrete improvements, fencing, installing a shade sail, constructing 18” x 18” concrete capped seat walls with board-deterrent notches, installation of catch basins, piping and bedding, pretreatment devise and dry well, and demolition, ADA curb ramps, parking lot rehabilitation, ADA parking stalls, walking pathways, and storm drain improvements. Z&K is providing contract administration, construction management, inspection, utility coordination, labor compliance, public outreach, geotechnical and material testing services, and project close-out. Z&K provided a full comprehensive constructability review performed by the CM team.
PROJECT TEAM, ORGANIZATIONAL
CHART, & RESUMES
PROJECT STAFFING
Z&K has carefully selected this "A-Team" and has committed our most qualified staff for the duration of the contract. Our proposed team members have extensive experience in Construction Management and Inspection of capital improvement projects. Z&K has first-hand experience on the expectations and requirements to make the City’s Projects a success. These are important Projects for the City, community, and Councilmembers. We understand the staff effort needed to complete these projects on time and within budget. Our team members are multidisciplinary and have numerous licenses and certifications. Our proposed team is exceptionally strong and will ensure the successful delivery of the Project. We understand the importance of meeting budgets and schedules; we have a strategic plan in place to deliver this project with such benchmarks in mind.
This Team has worked together in this same capacity on multiple capital improvement projects. In addition to their extensive project specific experience, this team has great synergy and works very well together as well as with City Staff.
All key members are local to the area and are excited about the opportunity to improve their community. Our strategic and efficient staffing approach also results in significant cost savings to the City. The organization chart below delineates the communication/reporting relationships among the project staff.
Our proposed and fully committed team is fully capable and exceptionally qualified. They have held many leadership and supervisory management positions in many local agencies including the private and public sectors. They deliver their knowledge and expertise with tact and seamless integration with staff and outside agencies.
SUBCONSULTANTS
CONVERSE CONSULTANTS | In 1946, Professor Frederick J. Converse established Converse Consultants (Converse) in Pasadena, California to provide the construction industry with geotechnical engineering and geological services. Converse is an employee-owned corporation. Their professional and technical staff includes in-house geotechnical engineers, engineering geologists, environmental scientists, deputy inspectors, laboratory and field technicians, drafting/CAD specialists, and other specialized support personnel.
KEY PERSONNEL BIOS
Zack Faqih, MSCE, PE, QSD/P, CBO | Senior Project Manager/Senior Construction Manager Zack has more than 32 years of construction and project management experience in both private and public sectors. Zack served as a Project Manager/Construction Manager/Resident Engineer and designer on numerous highway and roadway projects within Caltrans right-of-way, including many over the Santa Ana River. Zack has successfully delivered over 40 street improvement projects. He has demonstrated expertise in all aspects of project and construction management through a wide range of responsibilities including budget analysis, contract negotiations, dispute resolution board, schedule development and assessment, constructability reviews, bid document review, schedule management, CEQA/NEPA, project closure documentation, stakeholders and team coordination, quality control, quality assurance, inspection, and management of the flow of information between project members and stakeholders. His unique background in contracting and general construction, coupled with his many assignments serving as the owner’s representative and numerous professional licenses and ICC certifications, gives Zack a very unique perspective and skill set that is the basis of his highly successful history of project delivery. Zack has extensive experience managing multiple projects requiring interfacing and coordination with Caltrans, counties, funding agencies, Federal-FHWA/BIA, railroad and utility companies, and environmental and regulatory agencies. Mr. Faqih has thorough knowledge Caltrans systems and procedures, Caltrans audits, Caltrans standard plans specs, and manual. Mr. Faqih has thorough knowledge of the federal funding requirements, including the Federal American Rescue (ARPA) funds.
LICENSES & REGISTRATION
» Professional Engineer, P.E. State of California, C57958 » Certified Accessibility Inspector/Plans Examiner
» Certified Building Official, C.B.O., CABO, ICC #3741
» Certified Plans Examiner, I.C.B.O., #1020345-60
» Certified Mechanical Inspector, I.C.B.O. #1020345-40
» Certified Plumbing Inspector, I.C.B.O. #1020345-30
» Certified Electrical Inspector, I.C.B.O. #1020345-20
» SWPPP (QSD) & (QSP) #22055
» OSHA 30 Hour Certification
» State Certified HERS Rater
» Certified Emergency Inspector
» C.G.B.P Certified Green Building Inspector
» Certified Special Inspector for Fire Proofing
» Certified Special Inspector for Structural Welding
» Certified Special Inspector for Structural Steel
» Certified Special Inspector for Reinforced Concret
Ed Nylund, QSP, CESSWI | Senior Construction Inspector
Mr. Nylund has over 34 years of experience providing quality control and quality assurance with extensive experience on of numerous major capital improvement projects including street improvements, traffic signal improvements, roadway widenings, bridges, transmission mains, new wells, tanks, reservoirs, water and wastewater treatment plants, pipelines, lift stations, booster pump stations, retaining walls, dewatering, parks and facilities, landscaping and irrigation improvements, utility installation, roadway widenings, grade separations, masonry walls, storm drain projects, roadway projects, street rehabilitations, and large-scale water and wastewater projects. Mr. Nylund was the Chief Public Works Inspector for the City of Chino for over 27 years inspecting street and traffic improvement projects, parks, facilities, storm drain, and water/wastewater projects.He has provided construction inspection services for numerous local agencies. He has extensive Public Works Inspection experience and understands the expectations of the City since he has worked in the public and private sectors. He will integrate seamlessly with City staff to successfully deliver the City’s citywide projects. He has a depth of resources to support him on this project. Mr. Nylund is a certified Grade 2 Water Treatment Operator and Grade 3 Water Distribution Operator. Mr. Nylund has provided quality assurance inspection as a lead inspector on numerous projects including as project features such as: project startup, excavations, jack and bore, backfill, reinforced concrete, masonry, structural steel, wood framing, coating of structures and pipes, telecommunications improvements, roofing, mechanical, electrical, and plumbing, and project closeout. Mr. Nytlund has performed electrical inspection for powerplants, lift stations, and traffic signal improvements. His responsibilities include inspection of all phases of public works construction projects, including drinking water, recycled water, sewer, storm drain, street lighting, traffic signals, roads, sidewalks, storm water pollution prevention BMPs, site grading and landscaping. Verify compliance with Federal/State/local laws and ordinances, traffic control requirements, approved working hours and approved methods/specifications/materials/quantities. Review and confirm compliance with Project Specific Plans and Specifications, Caltrans Plans and Specifications and Plans and Standard Specifications for Public Works Construction (Green Book).
Abdul Nasser | Senior Construction Inspector
Abdul is a seasoned senior construction inspector with over 32 years of experience on various capital improvement projects. He is well versed in the fields of transportation engineering, public works capital improvement projects, water/wastewater projects, and construction safety engineering/construction inspection. His journey includes pivotal roles as a Resident Engineer, Assistant Resident Engineer and Safety Officer, Lead Structures Inspector, and Lead Roadway and Utility Inspector, overseeing and contributing to multi-million to billion-dollar projects. These encompass complex and extensive Freeway Widening Projects, where he collaborated with industry leaders such as Caltrans and diverse consulting firms, consistently delivering excellence in project execution and safety assurance. Throughout his career, Abdul has primarily focused on Quality Assurance (Q.A) inspection for major construction projects. He has developed deep expertise in all aspects of roadway construction and management, including JPCP, HMA, RHMA, CIDH piles, Base and Sub-Base, Drainage facilities, ADA facilities/TPAR, safety devices MGS system, smart crush cushion, concrete barriers, sound-walls, curb and gutter, grading and slope paving, signs and striping, and traffic control. He demonstrates in-depth expertise in the LCS system and fosters effective collaboration with CHP to enhance safety and communication during freeway closures, including full freeway and detour situations. He also holds a deep grasp of SWPPP/BMP deployment and compliance monitoring. Abdul possesses extensive knowledge of critical documents such as the Caltrans Construction Manual, Cal.MUTCD, Traffic Safety System Guidance, Pedestrian Accessibility Guidelines for Highway Projects (DIB 82- 06), Construction Safety Manual, stormwater compliance during construction, safety devices, and claims avoidance. His vast reservoir of experience notably incorporates effective utility coordination on multi-million-dollar freeway widening and interchange improvement projects. His exceptional ability to build collaborative relationships within project teams sets him apart, enabling proactive issue resolution and ensuring consistently successful project outcomes.
Mr. Faqih has 32 years of experience in the Construction Management, Construction Inspection, Project Management, and Contract Administration of capital imporvement and public works projects, including street improvements, slurry seal, pavement rehabilitation, intersection improvements, sewer and storm drain improvements, traffic signal improvements, curbs, gutters, sidewalks, bridge projects, and access ramps. He has extensive experience managing multiple projects in Los Angeles County and Orange County since 1999. Mr. Faqih’s experience extends to interfacing and coordinating with the Caltrans-Local Assistance Program, Counties, Cities, Funding Agencies. He has excellent skills in understanding construction contracts, review and control project cost and schedule, coordinate and assist in negotiating change orders, maintain project as-builts, managing multiple subconsultants and supervise inspection staff. Mr. Faqih excels in providing detailed constructability review of project plans and specifications, which minimizes the potential project delays and change orders and assists the client from pre-award to project close-out to ensure full funding reimbursement. Zack has extensive experience managing multiple projects requiring interfacing and coordination with Caltrans, counties, funding agencies, Federal-FHWA/BIA, railroad and utility companies, and environmental and regulatory agencies.
RELEVANT PROJECT EXPERIENCE
County of San Bernardino, 215 Hwy. On-Ramp Reconstruction | Senior Construction Manager/Senior Project Manager: This county highway on ramp improvement program involved mobilization, Implementation of traffic control, removal and reconstruction of asphalt and concrete on the off ramp, Highway sign improvements, traffic signal and electrical improvements, installation of RCP drainage system, installed 4 concrete catch basins and grubbing. We also partially removed the previous abutment and installed a new 30’ decorated retaining wall to make room for the added auxiliary lane in the project.
City of Chino: Traffic Signal Interconnect Project, Capital Improvement | Senior Construction Manager: Location: City of Chino, Central Ave @ Francis Ave to Kimball Ave @ Fern Ave. Contractor: Cross Town Electric. Install approximately 4 miles of 4” HDPE conduit and 24 strand FO cable. Install Ethernet equipment and achieve communications between 24 traffic signals and City Hall Central Communication System.
City of Chino: Installation Of 8 New and Modification of 17 Existing Traffic Signal Systems | Senior Construction Manager: Contractors: Siemens Electric, Steiny Company, MSL Construction, Elecnor Belco, Ferreira Construction, DBX Inc. Demolition of existing improvements and construction of pole foundations, electrical conduit, poles & mast arms, curb ramps, sign City of Beaumont, 10 Freeway Lane Reconstruction | Senior Construction Manager/Senior Project Manager: The 10 freeway and 60 freeway highway improvement involved removal and reconstruction of concrete panels, slope adjustments throughout the project, implementation of traffic control, traffic signal and electrical improvements, methacrylate concrete on 6 bridge decks, added #1 lanes on North and South bound lanes, construct concrete median barriers, install steel corrugated pipe.
City of Azusa, Retrofit Bridge | Senior Construction Manager/Senior Project Manager: The Azusa highway improvement program on the 210 Freeway. Involved adding auxiliary lanes to both east and west sides of the Freeway. To increase the flow of traffic. the job also involved the implementation of traffic control, install concrete barrier, traffic signal and electrical improvements, install stamped concrete at 4 different gore points, retrofit concrete encasements around 7 bridge bents from Irwindale Ave to Zachary Padilla Ave, asphalt milling and reinstallation on the shoulders, install RCP drain along the concrete barrier, construct 12 concrete catch basins.
City of Chino: Storm Drain Project, Capital Improvement | Senior Construction Manager: Location: City of Chino, Riverside Dr. from Benson Ave to Ross Ave. Contractor: Norstar Engineering. Installation of over 1800 LF of RCP ranging in size from 24” to 54”. Construction of 14 PCC reinforced storm drain structures. Installation of 7 crossing/support structures for existing utilities. Relocation of 75 LF of existing traffic signal conduit and cable. Following final trench repairs, placement of 80,000 SF of Type II asphalt road slurry. Replacement of traffic signal loops.
City of Chino: Storm Drain Project, Capital Improvement | Senior Construction Manager: Location: City of Chino, Riverside Dr. from Russell Ave to Telephone Ave. Contractor: Christensen Brothers Construction. Installation of over 2100 LF of RCP ranging in size from 24” to 66”. Construction of 13 PCC reinforced storm drain structures. Installation of 9 crossing/support structures for existing utilities. Relocation of 150 LF of existing AC water main with PVC. Following final trench repairs, placement of 108,000 SF of Type II asphalt road slurry. Replacement of traffic signal loops.
City of Corona, Street Reconstruction | Senior Construction Manager/Senior Project Manager: This citywide street improvement program in the City of Corona involved mobilization, removal and reconstruction of curb and gutters, sidewalks, driveway approaches, spandrels, cross gutters, ADA curb ramps, removal and reconstruction of existing pavement, milling
EDUCATION » MSCE - Structures
Cal State Fullerton 2005 » BSCE - Civil /Transportation Cal State LA 1985 LICENSES & REGISTRATION » Professional Engineer, PE State of California, C57958 » Certified Accessibility Inspector/Plans Examiner » Certified Building Official » Certified Plans Examiner » Certified Mechanical Inspector » Certified Plumbing Inspector » Certified Electrical Inspector » SWPPP (QSD) & (QSP) Certificate # 22055 » OSHA 30 Hour Construction Safety & Health » State Certified HERS Rater » Certified Emergency Inspector » C.G.B.P Certified Green Building Inspector » Certified Special Inspector for Fire Proofing » Certified Special Inspector for Structural Welding » Certified Special Inspector for Structural Steel » Certified Special Inspector for Reinforced Concrete
Zack Faqih, MSCE, PE, QSD/P C.B.O.
Senior Project Manager/Senior Construction Manager
Resident Project Representative
and overlaying with new asphalt, traffic signal modification, adjustment of manholes and utility covers to grade, install RCP, traffic signing, striping and markings, traffic markers and implementation of traffic control.
City of Manhattan Beach, Citywide Street Improvements | Senior Construction Manager/Senior Project Manager The citywide street improvement involved implementation of traffic control, traffic signal modification, removal of all legends, lane lines, parking stalls, parking T’s, reinstallation of all markings.
City of Inglewood, Citywide Sign Improvement | Senior Construction Manager/Senior Project Manager: The city of Inglewood job involved removing all “no parking signs” and installing the new citywide permit signs at all locations in order to accommodate all residents that were affected by the installation of SoFi stadium.
County of Los Angeles, LACDPW Slauson Avenue Revitalization | Senior Construction Manager/Senior Project Manager: This project includes resurfacing of roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of concrete pavement and crosswalks, and streetscape.
County of Los Angeles, LACDPW Firestone Blvd. Street Rehabilitation | Senior Construction Manager/Senior Project Manager: This project includes resurfacing of roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of concrete pavement and crosswalks, and streetscape improvements.
City of Irwindale, 21-22 Resurfacing Project: Residential Resurfacing Phase I – Ayon Ave, Calle Del Norte, Pat Miranda Ln, Calle De Paseo, Allen Dr, Progress Ln, Central St & Peppertree Ln; P-1034 | Senior Construction Manager/Senior Project Manager : Mr. Faqih provided construction management and inspection for this project. The project included street resurfacing, traffic control, raised crosswalks, speed humps, cold milling and AC overlay of existing asphalt concrete, construction of new curb and gutter, PCC sidewalk, installation and configuration of multiple traffic loop detectors, installation of city project signs, preservation of existing city survey monuments, adjusting manhole and utility covers to grade, installation of pavement markings and striping. Related work includes mobilization, traffic control, assisting in preparation of NPDES, local utility coordination, construction management, daily inspection, labor compliance, geotechnical and materials testing coordination.
City of Irvine Street Rehabilitation Program | Senior Construction Manager/Senior Project Manager : This project involved asphalt reconstruction on the Northbound and Southbound lanes to accommodate UCI and the traffic around the school. We also added a concrete median with decorative concrete, installed 12” DIP water line, implemented traffic control, installed curb and gutter per ADA standards, adjustment to manhole covers and utility covers to grade.
City of Temecula, Pavement Rehabilitation Program – Winchester Road (Jefferson Avenue to Ynez Road) | Senior Construction Manager/Senior Project Manager: for the City of Temecula pavement rehabilitation program. The work for this project generally includes pavement Improvements along Winchester Road from Jefferson Avenue to Ynez Road. Improvements Include, remove and replace existing asphalt pavement, reconstruction of traffic loops, adjust existing manholes and valves for different utilities, and installation of striping and pavement markers.
City of San Marino, Street Rehabilitation Program | Senior Construction Manager/Senior Project Manager: The program’s improvements include construction of cold-milling asphalt concrete pavement and re-paving with hot mix asphalt (HMA) and asphalt rubber hot mix (ARHM), clearing and grubbing, removal and disposal of Macadam base materials, localized pavement repairs, replacing impacted traffic striping, markings, pavement legends, loop detectors, curb painting, replacing damaged curb and gutter, curb ramps, cross gutters, sidewalks, driveways and driveway approaches, installing speed humps, adjusting utility frames and grates, inspection and replacement of sewer manholes, water valves, water meters, and storm drain manholes, coordinating with local utilities, preparation and implementation of SWPPP, and providing temporary traffic control.
City of San Bernardino, Street Rehabilitation and Resurfacing of Ten City Streets | Senior Construction Manager/Senior Project Manager: The project included the street rehabilitation and resurfacing of 10 City residential and commercial streets. The project technical features include: resurfacing; concrete overlays; unclassified excavation/fill; cold mill & overlay; removal of existing sidewalk, curb and gutter; driveway approaches, and speed humps; and the construction of sidewalk, curb ramps, cross walks, cross gutters, driveway approaches, and asphalt and concrete improvements of several City streets. The project also includes tree removals and several manhole/utility adjustments.
City of Norwalk, Water Main Replacement Project on Pioneer Boulevard From 160th to 166th Street | Senior Construction Manager/Senior Project Manager: Mr. Faqih provided Construction Management and Inspection Services for this project for the City or Norwalk. The project includes the installation of 3,610 linear feet of new 8-inch Restrained Class 52 DIP Water Main and 3,035 linear feet of new 12-inch Restrained Class 52 DIP Water Main along Pioneer Boulevard from 160th Street to 166th Street, and east side streets connecting Pioneer Boulevard to Clarkdale Avenue in the South Service Area of the City’s Municipal Water System. The project’s scope of work includes demolition and reconstruction of the 12” iron ductile pipeline and all associated renovations to the City’s existing water services, such as installation of fittings, valves, blow-offs, siphons, concrete pipe supports, thrust blocks, trenching, bedding and backfill, replacement of traffic markings, shoring, over excavation, temporary and permanent pavement, steel plating, and roadway improvements.
City of Fullerton: Longview Drive Water Main/Sewer Main Replacement and Street Improvements, Fullerton, CA - Senior Construction Manager/Senior Project Manager r for water, sewer and street rehabilitation project. The project included replacing 2500 linear feet of 8-inch DIP water main and appurtenances, 2500 linear feet of 8-inch VCP, PVC SDR 26 sewer main, new manholes, removing and replacing existing sewer and abandoning existing water mains and valves.
Street and drainage improvement work included cold planning, excavation, asphalt concrete, aggregate base, curb/gutter, and sidewalk replacement.
City of Chino: Central Avenue and Dupont Avenue Waterline Replacement Project | Senior construction manager: The Central Avenue project includes the replacement of a 16” steel to an 18” PVC water main on Central Avenue from Chino Avenue to C Street. The Project will also include the replacement of an 8” steel line on D Street pipe from Central Avenue to the alley west of 6th Street. Design for Central Avenue shall include connections to Chino Avenue, D Street, Alley 16, and two additional alleys. Several line stops may have to be used for tie-ins since there is insufficient valving for proper shutdowns along Central Avenue. The Dupont Avenue project includes the replacement of a 8” DIP waterline to a 12” C-900 PVC water main on Dupont Avenue from Alton Street to Gates Street. There are multiple water service connections and fire service laterals that will also need to be replaced.
Mr. Nylund has over 34 years of experience providing quality control and quality assurance with extensive experience on of numerous major capital improvement projects including street improvements, traffic signal improvements, roadway widenings, bridges, transmission mains, new wells, tanks, reservoirs, water and wastewater treatment plants, pipelines, lift stations, booster pump stations, retaining walls, dewatering, parks and facilities, landscaping and irrigation improvements, utility installation, roadway widenings, grade separations, masonry walls, storm drain projects, roadway projects, street rehabilitations, and large-scale water and wastewater projects. He has provided construction inspection services for numerous local agencies. He has extensive Public Works Inspection experience and understands the expectations of the City since he has worked in the public and private sectors. He will integrate seamlessly with City staff to successfully deliver the City’s citywide projects. He has a depth of resources to support him on this project. Mr.
Nylund is a certified Grade 2 Water Treatment Operator and Grade 3 Water Distribution Operator. Mr. Nylund has provided quality assurance inspection as a lead inspector on numerous projects including as project features such as: project startup, excavations, jack and bore, backfill, reinforced concrete, masonry, structural steel, wood framing, coating of structures and pipes, telecommunications improvements, roofing, mechanical, electrical, and plumbing, and project closeout. Mr. Nytlund has performed electrical inspection for powerplants, lift stations, and traffic signal improvements. His responsibilities include inspection of all phases of public works construction projects, including drinking water, recycled water, sewer, storm drain, street lighting, traffic signals, roads, sidewalks, storm water pollution prevention BMPs, site grading and landscaping. Verify compliance with Federal/State/local laws and ordinances, traffic control requirements, approved working hours and approved methods/specifications/materials/quantities. Review and confirm compliance with Project Specific Plans and Specifications, Caltrans Plans and Specifications and Plans and Standard Specifications for Public Works Construction (Green Book).
RELEVANT PROJECT EXPERIENCE
City of Temecula, Pavement Rehabilitation Program – Winchester Road | Senior Construction Inspector: The City of Temecula pavement rehabilitation program. The work for this project generally includes pavement Improvements along Winchester Road from Jefferson Avenue to Ynez Road. Improvements Include, remove and replace existing asphalt pavement, reconstruction of traffic loops, adjust existing manholes and valves for different utilities, and installation of striping and pavement markers.
City of Chino, SR60 Bridge Replacement Project | Senior Construction Inspector Agency: City of Chino | Location: SR60 @ Pipeline Ave and SR60 @ Benson Ave¸ City of Chino | Contractor: SEMA Construction, Subcontractor (water): SRK Construction. Replacement of 800 LF of existing 16-inch and 18-inch domestic water main, as part of the Benson Ave/60 Freeway Bridge Replacement. This included construction of HDPE domestic water bypass lines of 12-inch and 16-inch diameters, construction of the bridge hanger and casing system and construction of 2 new CMLC water lines. Pipeline Avenue 12-inch VCP SS Replacement. This work consisted of the removal of an existing 12-inch Truss Pipe sewer and open trench construction of 2,100 LF of new 12-inch VCP and 600 LF of 4-inch VCP, 1,500 LF of 36-inch Horizontal Directional Drill Steel Gas Main installation.
City of Indio: Jackson Street Traffic Signal and Street Improvements | Senior Construction Inspector Location: City of Indio, Jackson Street from I-10 freeway to Dr. Carreon Blvd. Construction of new traffic signal system. Complete removal and replacement of three existing traffic signal systems. Installation of associated traffic signal communications equipment. Demolition of three existing intersections including existing AC paving, street structural section, PCC gutters, PCC spandrels, PCC curb, PCC sidewalks and ADA compliant sidewalk ramps. Complete reconstruction of all improvements, with modified surface elevations, at all intersections. Adjustment of all existing utilities to modified street elevations. Installation of new traffic signage and striping. Coordinated road closures and traffic detours with local businesses. Inspected installation of work area traffic control for compliance with approved plans.
Additional Recent Projects: • City of Indio: Highway 111 - Young’s Lane Median Improvements Project • City of Corona: Citywide Sidewalk Improvements • City of Chino: Storm Drain Project, Capital Improvement • City of Chino: Storm Drain Project, Capital Improvement • City of Chino: Public Street Asphalt Paving Rehabilitation Projects, Capital Improvement • City of Chino: Traffic Signal Interconnect Project, Capital Improvement | Senior Construction Inspector • City of Chino: Installation of 8 New and Modification of 17 Existing Traffic Signal Systems • City of Jurupa Valley, Granite Hill Drive Pipeline – Phase 1 and Phase 2 • City of Lake Elsinore, District, Nichols Road Transmission Main (TR37305) • County of Riverside, 36” Butterfly Valve Replacement • City of Chino, Public Improvements and Commercial Development of Industrial Tilt-Up Buildings • City of Jurupa Valley, Sanitary Sewer Bypass System • City of Chino: Benson Ave Storm Drain Project, Capital Improvement • City of Jurupa Valley, Sky Country Trunk Sewer Improvement Project
EDUCATION
» Construction Technology,
Orange Coast College
» Building Inspection
Technology,
Coastline College,
Huntington
Beach, CA
LICENSES & REGISTRATION
» Water Treatment Operator –
Grade 2 | Certificate No. 17150
» Water Distribution Operator –
Grade 3 | Certificate No. 4903
» QSP Certificate No. 26356
» Traffic Signal Senior Field
Technician III Certificate No.
97687
» Traffic Signal Inspector
Certificate No. SI97687
Ed Nylund, QSP, CWSSWI
Senior Construction Inspector
§ Street Improvements
§ Bridges
§ Retaining Walls
§ Stairways
§ Coastal Commission
§ Drainage Improvements
§ Landscaping Improvements
§ Project Field Review & Documentation
§ Quality Control/Quality Assurance
§ Concrete Pathways
§ Street Improvements
§ Bridges
§ Retaining Walls
§ Stairways
§ Coastal Commission
§ Drainage Improvements
§ Landscaping Improvements
§ Project Field Review & Documentation
§ Quality Control/Quality Assurance
§ Concrete Pathways
Abdul is a seasoned resident engineer and senior construction inspector with over 32 years of experience. He is well versed in the fields of transportation engineering, public works capital improvement projects, water/wastewater projects, and construction safety engineering/construction inspection. His journey includes pivotal roles as a Resident Engineer, Assistant Resident Engineer and Safety Officer, Lead Structures Inspector, and Lead Roadway and Utility Inspector, overseeing and contributing to multi-million to billion-dollar projects. These encompass complex and extensive Freeway Widening Projects, where he collaborated with industry leaders such as Caltrans and diverse consulting firms, consistently delivering excellence in project execution and safety assurance. Throughout his career, Abdul has primarily focused on Quality Assurance (Q.A) inspection for major construction projects. He has developed deep expertise in all aspects of roadway construction and management, including JPCP, HMA, RHMA, CIDH piles, Base and Sub-Base, Drainage facilities, ADA facilities/TPAR, safety devices MGS system, smart crush cushion, concrete barriers, sound-walls, curb and gutter, grading and slope paving, signs and striping, and traffic control. He demonstrates in-depth expertise in the LCS system and fosters effective collaboration with CHP to enhance safety and communication during freeway closures, including full freeway and detour situations. He also holds a deep grasp of SWPPP/BMP deployment and compliance monitoring. Abdul possesses extensive knowledge of critical documents such as the Caltrans Construction Manual, Cal.MUTCD, Traffic Safety System Guidance, Pedestrian Accessibility Guidelines for Highway Projects (DIB 82-06), Construction Safety Manual, stormwater compliance during construction, safety devices, and claims avoidance. His vast reservoir of experience notably incorporates effective utility coordination on multi- million-dollar freeway widening and interchange improvement projects. His exceptional ability to build collaborative relationships within project teams sets him apart, enabling proactive issue resolution and ensuring consistently successful project outcomes.
RELEVANT PROJECT EXPERIENCE
Orange County, I-5 Widening in the City of Mission Viejo and Laguna Niguel | Senior Construction Inspector
As part of a complex and intricate freeway widening project spanning 2.1 miles along the I-5, the expansion encompassed the addition of one general-purpose lane in each direction, along with auxiliary lanes. This project also entailed the replacement of the freeway bridge at Avery Pkwy.U.C. with a new bridge, the construction of 19 retaining walls (including two walls exceeding 30 feet in height and nearly a quarter mile in length), signal and lighting installation, fiber optic and communication systems replacement, including ramp metering, and the construction of a brand-new freeway communications systems HUB building. Other elements included drainage and irrigation systems, ADA ramps, TPAR, concrete barriers, MGS, and both JPCP and Asphalt pavement construction. The project necessitated extensive staging and traffic switches to ensure the uninterrupted flow of traffic on the main north-south freeway on the West Coast.
City of Beaumont, Wastewater Treatment Plant Expansion & Brine Pipeline Project | Senior Construction Inspector The Z&K Team provided Construction Management and Inspection Services for this project. Per the City’s NPDES Permit, once flows at the WWTP reached 75% of the permitted capacity, the City is required to begin the planning, design and funding process to expand the plant. In addition to the need for more capacity to serve the City’s growing customer base, the City is mandated by the Regional Water Quality Control Board (Regional Board) to upgrade its WWTP to meet groundwater basin objectives. The City of Beaumont’s Wastewater Treatment Plant (WWTP) Expansion/Renovation Project includes increased the permitted capacity from 4 MGD to 6 MGD.
Additional Recent Projects:
• City of Corona, Bedford Wash Bridge and Street Improvements • City of Norwalk, Water Main Replacement Project on Pioneer Boulevard From 160th to 166th Street • City of San Bernardino, Second Street Bridge Over Warm Creek • I-5/Oso Parkway Interchange Improvement
• State Route 22 Design-Build Project
• City Of Oceanside, San Luis Rey (Slr) Wastewater Treatment Plant Project • City of Chino: Central Avenue and Dupont Avenue Waterline Replacement Project • Magazine Canyon Pipeline Emergency Repairs from Northridge Earthquake – Metropolitan Water District of SoCal • City of Anaheim: Lenain Water Treatment Plant Improvements, Anaheim, CA • City of Manhattan Beach, Citywide Street Improvements • City of Irvine Street Rehabilitation Program
• City of Alhambra: FY 19-20 SB1 Street Rehabilitation Project, Alhambra, CA
EDUCATION » B.S. Civil Engineering
(Construction Management),
University of Washington.
» P.E. License in progress.
LICENSES &
REGISTRATION
» ADA Construction
Inspection
» COZEEP/MAZEEP
Enhanced Enforcement
» Confined Space Training
» Construction Hazardous
Waste Management
» Construction Stormwater
Refreshment
» CPR Refresher
» Defensive Driver Class
» Dust Control on
Construction Sites
» Fundamentals of Partnering
» Guardrail End Terminal
Inspection and Safety
Devices
» Hazard Communication
with GHS
» Hot Mix Asphalt (HMA)
Inspection
» Lean Sigma 6-Safety
Review Process
Improvement
» Management of
Construction Site Dewatering
» Project Risk Management
» Safety Awareness Training
» Safety Device Training
» Standard First Aid
» Temporary Traffic Control
» TMP Advanced Workshop
» Traffic Safety System
Abdullah Nasser, BSCE
Senior Construction Inspector
PROJECT MANAGEMENT AND
CAPABILITIES
PROJECT MANAGEMENT AND CAPABILITIES
MANAGEMENT APPROACH
We have successfully utilized CM Agency delivery on a host of projects. Through this experience we have developed management procedures that promote collaboration and teamwork, improve quality and maximize the value of the project.
Z&K past performance with Cities, Counties, and other agencies shows our remarkable ability to control costs, guarantee great quality of work, and meet all project deadlines. We understand the importance of Schedule Control and are known in the industry for assisting the contractor to cut the project schedule and to yield significant savings for our clients through reduction of overhead management and construction costs. The most significant saving is less inconvenience to the traveling public and less City exposure due to shortened construction duration. This will help extend excess project funds into other important projects.
MANAGEMENT APPROACH | Z&K Consultants, Inc. provides proven professional construction management techniques to ensure the safe construction of a quality project completed on time and within budget. Z&K accomplished this by establishing the systems, policies, and procedures necessary to ensure adequate project controls are in place. The Team must ensure all parties understand the basic responsibilities and interrelationships of all team member such as the Owner (both project management and operations), the Design Engineer, the Contractor, the construction management team, and the subconsultants. Additionally, a good Senior Construction Inspector must have the knowledge and experience to effectively understand the interrelationships between the key management components of time, information, cost, and quality. Decision making, including obtaining sufficient information to make reasoned decisions, is the key element leading to a successful project. the project. The Z&K approach is founded on a thorough understanding of each of the management components critical to the project.
TIME MANAGEMENT | Time management uses scheduling to accurately manage and track the restrictive elements of time and resources throughout the project. The key to a successfully implemented and managed schedule is the development of an accurate, detailed, and realistic baseline schedule. Z&K will review the Contractor’s baseline schedule to ensure it is accurate and reasonable. Activity durations and logic ties will be examined for accuracy and constructability. The schedule logic and activity durations will also be analyzed to ensure the Contractor does not use float suppression techniques.
Schedule float is a valuable resource for the Owner and the Contractor. Schedule implementation and administration is the next step in proper time management. The Contractor’s actual progress will be documented daily. The Z&K Team will review the progress with the Contractor at the weekly meetings. The Contractor’s three-week-look-ahead schedule will be compared with the work plan on the record schedule to ensure the Contractor continues to use the record schedule as a management tool. We will check the record schedule for activities with start dates that did not begin during the review period.
This proactive approach flags potential delay issues for further discussion.
COST MANAGEMENT| Z&K will take the lead to ensure a cost management system is properly implemented and maintained. Z&K’s cost management role will be in two parts. The first is to track the value of the completed work to ensure accurate and detailed monthly progress billing by the contractor. Secondly, Z&K will proactively manage the change order process. The monthly progress billing may be tied to the construction schedule. Each month, the Construction Inspector will review and approve the updated cost loaded CPM. Work activities and material deliveries will be assigned the correct completion percentage by the Contractor. This will be reviewed by the Construction Inspector and discrepancies will be addressed. If necessary, the Contractor will revise and resubmit the schedule of values. This process ensures the Owner is accurately billed for the completed work monthly. Changes in work and unforeseen conditions will be closely monitored.
Any costs for changes will be managed by the Z&K construction Inspection team. An ongoing log of potential change issues will be maintained. These issues will be discussed and updated at each weekly meeting.
FUNDING MANAGEMENT | Z&K will ensure that the City has all necessary information to comply with the funding requirements. Our team is experienced in complying with funding reporting and filing requirements. We pay close attention to these requirements and deadlines so that project funding remains unaffected and so that file audits are conducted quickly and efficiently. Our team is also experienced in ensuring that project documents show compliance with DBE reporting requirements, DBE goals, and/or good faith effort documented. Proper Project documentation is key in any audits.
QUALITY MANAGEMENT | Quality management is an inherent CM responsibility. Z&K is knowledgeable and capable in all aspects of quality management. Quality assurance is the application of systematic methods to verify the effective implementation of quality control procedures. Z&K will manage the quality of the project by taking the quality assurance lead role and implementing the Z&K quality assurance program, which allocates quality control responsibilities to the various project participants to ensure the constructed product conforms to the contract plans and specifications. This includes a detailed inspection plan, inspection procedures, and documentation procedures for all inspection and test reports. Z&K will review the Contractor’s quality control procedures to ensure adequacy. Quality control issues will be discussed at each weekly meeting. An ongoing deficiencies/corrective items list will be maintained, reviewed, and updated weekly. Quality assurance includes quality of the constructed work as well as the quality of the Contractor’s document processes (such as the Contractor’s submittals and RFIs). In Z&K’s experience, lack of quality in the paperwork with items such as poor submittals and unanswered RFIs may lead to lack of quality in the constructed product. Deficiencies in submittal quality control by the Contractor often leads to incorrect or inferior equipment and materials being installed.
Z&K will be proactive with the Contractor to ensure the quality of their submittals. Likewise, lax procedures for the processing of RFIs may lead to misunderstandings and delays. Z&K will take a proactive approach with the Contractor and the Design Engineer to ensure the quality of the RFI process is maintained. Finally, Z&K regularly performs internal audits of its field operations to ensure the proper implementation of procedures for Z&K’s quality assurance program.
INFORMATION MANAGEMENT | Proper information flow is crucial to the success of a project. A construction project generates a large amount of information, which must be distributed to all parties on a timely basis. The source of this information will cover the full spectrum including contracts, meeting minutes, drawings and specifications, submittals, RFIs, pay requests, invoices, inspection reports, and so forth. Z&K will act as the hub for the management of all information flow.
Z&K has extensive experience providing document management solutions for its clients. Z&K’s approach to information
management also includes building a communication framework to foster partnering and teamwork relationships for all the project stakeholders.
Z&K builds this from the start of the project with an all-inclusive kick-off meeting where the lines of communication and project responsibilities will be clearly explained to all the project stakeholders. The emphasis on project communication continues throughout the project with the weekly construction meetings. At each weekly meeting, all ongoing issues will be reviewed and discussed. All project stakeholders will be invited to the meetings. An agenda of meeting topics will be distributed in advance and include items such as safety, old business, updated progress of the work, RFIs, submittals, testing and inspection reports, non-conformance notices, environmental monitoring, change orders, three-week-look-ahead schedule, pay requests, and so forth. Unresolved issues will be carried over to the next week’s meeting until a final resolution CODES & PROCEDURES MANAGEMENT | Z&K has a strong knowledge of the City, County, State, and Federal codes and procedures that are required to deliver a successful project. Z&K will ensure that all codes and procedures are properly followed for the City’s Project. Some of the requirements are as follows:
o Project Construction Documents
o City of Corona Public Works and
Department of Water and Power
Standards
o California Building Code
o California Plumbing Code
o California Mechanical Code
o California Electrical Code
o California Building Energy Efficiency Standards
o Title 24, Part 2, 2.5, 3, 4, 5, 6, 11
o California Fire Code
o California Residential Code
o California Green Building Code
o California Disabled Regulations
o City Codes & Ordinances
o City Grading Code & Manual
o APWA “Greenbook” Standard Specifications for
Public Works Construction
o AWWA Standards
o Construction Specifications Institute (CSI)
o Underground Construction Standards
o Caltrans Standards,
Specifications, and
Procedures
o Caltrans Construction Manual
o Caltrans Safety Manual
o OSHA Construction Safety
Orders
o 10/30-hr OSHA Training
Certification
o Local Assistance Procedures Manual (LAPM)
o State and Federal Building Codes (Site
Accessibility)
o County Procedures and Guidelines
o Work Area Traffic Control Handbook (WATCH) Manual
o Manual of Uniform Traffic Control Devices
(MUTCD)
o Project Safety Plan (PSP)
o Site Health and Safety Plan
o Activity Hazard Analysis (AHA)
TASK ORDER APPROACH | Z&K’s project management approach is derived from many years of experience and proven success and includes very specific strategies.
Coordination | All task orders will require coordination. That can come in the form of coordination with other City departments, local agencies, and stakeholders. On-call contracts require similar coordination efforts in which Z&K has established and maintained outside-agency contacts, coordinated designs with their staff, and obtained necessary approvals to move the project forward.
Communication | Z&K has a formal, proactive communication plan to share critical project information as soon as possible and to make sure there are no surprises. We continuously report progress, identify problems, assign priorities, receive feedback, and document progress. From project start-up through project closeout, we will prioritize our communication to make sure all required actions are documented and addressed in a timely manner. This level of coordination, coupled with the project progress meetings, helps avoid project issues and delays, and monitors the project schedule and budget.
Documentation | Proper documentation is critical for all projects. We have a thorough understanding of the document control procedures required for public works projects for a variety of funding sources. Z&K’s document control management policies are prepared to comply with the City’s requirements. Our typical monthly project progress reports include the status of deliverables, utility and outside-agency efforts, cost and schedule snapshot and analysis, issues discussion and recommended resolution actions. Monthly progress reports will be tailored to the needs of the City for each project.
Quality Assurance and Quality Control | QA/QC will be an ongoing task throughout the duration of the project. Z&K’s project and construction management QA/QC process starts with standardization of successful procedures. All projects utilize Z&K’s standardized project electronic filing system. Z&K’s electronic filing system is a cloud-based system accessible in real-time to all Z&K project team members as well as its client as requested. Daily, weekly, and periodic correspondence, logs and reports are regularly reviewed for accuracy, up-to-date maintenance, aging, and escalation of issues, appropriateness, potential changes and/or claims and contract compliance.
Schedule | Our inspector will prepare and maintain the schedule. The schedule, task lists, deliverables, agency review time, and progress reports will be used to list each task in the project to enable our project manager to hold members accountable for delivery. We will provide a summary report regularly that shows tasks completed, items that may have changed, and schedule updates if needed.
TECHNICAL COMPETENCE/INTERNET BASED TOOLS | Our Team has extensive in-house resources including, computer/iPad capabilities, software applications, modem protocol, modeling programs, training, VPOO Software systems, Scheduling Programs such as Primavera P6, Microsoft Project, Dropbox, CM Procedures Manual, Oracle, Design software, Electronic Document Control Systems (EDCS), Procore, and many other resources to support our Team.
FIRM CAPABILITIES | Z&K has sufficient capacity to perform the work within the time limitations, considering our current and planned workload. We currently have over 50 construction managers and inspectors on staff.
REFERENCES AND REPUTATION
REFERENCES AND REPUTATION
Z&K has successfully delivered over 50 similar Staff Augmentation Contracts projects serving in a similar capacity over the past 5 years. The Z&K team will act seamlessly as an extension of City staff and is prepared to provide the requested services. We have a track record of performing excellent services on similar contracts through saving significant time and cost from identification of the various critical elements controlling the project schedule to providing alternate practical solutions. Our team members’ unmatched experience in Inspection services of similar projects makes the Z&K team uniquely qualified to provide the requested services.
Our firm has successfully worked on numerous projects similar to the City of Downey’s upcoming CIPs including street and intersection widening, pavement and infrastructure rehabilitation and reconstruction, water and sewer infrastructure improvements, water supply treatment improvements, groundwater well improvements, streetscape enhancements, landscaping and irrigation, “green street” projects, drainage infrastructure and stormwater infiltration improvements, sidewalk, curb ramps and other pedestrian circulation improvements. traffic signals, street lighting and fiber- optic communications. Our Team has a strong past performance on projects through our control of costs, quality of work, ability to meet schedules, cooperation, responsiveness, and other managerial and attitudinal considerations.
Z&K commits to providing our best Construction Management and Inspection services for timely project completion. We will dedicate the necessary resources to complete the Project on time and within budget. Our key personnel will be assigned to the project for the entire duration and will not be removed or replaced without concurrence from the City.
We maintain close attention to our clients by tracking our contract budgets and schedules. Our Senior Construction Inspector will be available and is prepared to provide the requested services.
Z&K Consultants Inc. (Z&K) is a leading provider of Construction Management and Construction Inspection services. Our team members’ unmatched experience in Inspection of street improvement/resurfacing projects makes the Z&K team uniquely qualified to provide the services. Z&K has an excellent past record of performance on contracts with the city and over 60 cities/agencies throughout Southern California.
FIRM CAPABILITIES
Z&K has sufficient capacity to perform the work within the time limitations, considering our current and planned workload.
We currently have over 50 construction managers and inspectors on staff.
REFERENCES
City of Chino
Amer Jakher, Director of Public
Works
13220 Central Ave, Chino, CA
91710
[email protected]
909.334.3250
City of South Gate
Elias Saikaly, Project Manager
8650 California Ave, South
Gate, CA 90280
[email protected]
(562) 968-4860
City of Lake Forest
Nazila Mokarram, Principal
Civil Engineer
100 Civic Center Drive, Lake
Forest, CA 92630
[email protected]
(949) 461-3490
City of San Bernardino
Azzam Jabsheh,PE. TE.
Acting City Engineer
290 North D St
San Bernardino, CA 92401
[email protected]
(909) 384-7251
County of Riverside
Hector Davila, Engineering
Division Manager
4080 Lemon Street in
Riverside, CA 92501
[email protected]
(951) 955 6885
Long Beach Water
Department
Dennis Santos, Manager of
Engineering
1800 E Wardlow Rd, Long
Beach, CA, 90807
[email protected] |
562.570.2381
FEE SCHEDULE
FEE SCHEDULE
March 15, 2024
Matthew Baumgardner, PE, Director of Public Works/City Engineer City of Downey, Public Works Department
11111 Brookshire Avenue, Downey, CA 90241-7016
Subject: Fee Schedule for Statement of Qualifications for FY 2024-2027 On-Call Public Works Construction Management, Inspection and Material Testing Services, RFQ No. 24-02 Dear Mr. Baumgardner,
Z&K Consultants, Inc. (Z&K) proudly presents our cost proposal for RFQ No. 24-02. Z&K Consultants based our cost proposal on the scope of work provided in the Request for Proposals. All prevailing wage requirements will be followed by the team. All team members are in conformance with the State of California Labor compliance requirements. Rates included in our Cost Proposal are fully billable rates. All overhead costs are included. All insurance will be in force at the time of contract execution.
Z&K has carefully selected this "A-Team" and committed our most qualified staff for the duration of the contract to deliver a successful project. We understand the importance of meeting budgets and schedules; we have a strategic plan in place to deliver projects with such benchmarks in mind. Our proposed team members are recognized as experts in Construction Inspection services and will provide “turn-key” services for the City’s Project.
Below is a table with the hourly rate schedule:
Z&K Consultants, Inc Hourly Rates:
Senior Project Manager ....................................................................................................................................... $167 Project Manager .................................................................................................................................................. $158 Senior Construction Manager .............................................................................................................................. $166 Construction Manager ......................................................................................................................................... $158 Senior Construction Inspector ............................................................................................................................. $148 Construction Inspector ......................................................................................................................................... $142 Claims Mitigation ................................................................................................................................................. $165 Deputy/Special Inspector ..................................................................................................................................... $148 Office Engineer/Document Control ...................................................................................................................... $138 Labor Compliance Officer .................................................................................................................................... $135 Scheduler/Estimator ............................................................................................................................................ $145 Surveyor .............................................................................................................................................................. $159 Drone Pilot ........................................................................................................................................................... $135 SWPPP/Environmental Specialist ....................................................................................................................... $158 Landscape Architect ............................................................................................................................................ $162 Senior Highway & Bridge Designer/Structural Engineer ..................................................................................... $165 Public Relations/Community Outreach ................................................................................................................ $135 Converse Hourly Rates (Subconsultant):
Material Testing Services .............................................................................................................................. Attached Overtime rates are billed at 1.5x the regular rate and double time rates are 2x the regular rates. Our proposed and fully committed team is fully capable and exceptionally qualified. They have held many leadership roles and supervisory management positions in many local agencies including the private and public sectors. All can multi-task, are multi- disciplined, and have a full understanding of all aspects of the proposed project requirements.
I will serve as the contact person for the full duration on the contract and I am authorized to bind the firm to the terms of the proposal. By signing below, I attest that all information submitted is true and accurate. This proposal shall remain valid for a period of not less than 90 days from the date of submittal. The payment terms shall be net thirty (30) days. We are excited about this opportunity to serve the City and are committed to the successful completion the City’s important project.
Sincerely,
Crystal Fraire, PE | President
Z&K Consultants Inc.
17130 Van Buren Blvd. | Suite 122 | Riverside, CA 92504 951.310.7470 | [email protected]
1 CITY OF DOWNEY
PROFESSIONAL SERVICES AGREEMENT
WITH ____________________________________________
FOR PROFESSIONAL CONSTRUCTION MANAGEMENT, INSPECTION AND MATERIALS
TESTING SERVICES
1. PARTIES AND DATE.
This Agreement is made and entered into this ______ day of May, 2024 by and between the City of Downey, a California municipal corporation and charter city with its principal place of business at 11111 Brookshire Avenue, Downey California 90241 ("City") and ____________________________________________, ____, a California [corporation LLC], with its principal place of business at ______________________________________, _______________, ________________ __________ ("Consultant"). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties.”
2. RECITALS.
2.1 Consultant.
Consultant desires to perform and assume responsibility for the provision of certain professional engineering services required by City on the terms and conditions set forth in this Agreement. Consultant represents that it has demonstrated competence and experience in providing professional engineering services to public clients, is licensed in the State of California, and is familiar with the plans of City.
2.2 Project.
City desires to engage Consultant to render such services for [Enter name of project here] as set forth in this Agreement.
3. TERMS.
3.1 Scope of Services and Term.
3.1.1 General Scope of Services. Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional engineering services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.
3.1.2 Term. The term of this Agreement shall be from [Enter begin date here] to [Enter end date here], unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The term of this Agreement may be extended by a written amendment to this Agreement signed by the City Manager and Consultant.
Attachment H
2 3.2 Responsibilities of Consultant.
3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee. Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.
In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (CalPERS) to be eligible for enrollment in CalPERS as an employee of City, Consultant shall indemnify, defend, and hold harmless CITY for the payment of any employee and/or employer contributions for CalPERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
3.2.2 Schedule of Services. Consultant shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "A" attached hereto and incorporated herein by reference.
Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall respond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. The parties acknowledge that the Schedule of Services may be amended by mutual agreement due to changes in circumstances, including changes in the performance schedules of other third parties performing work for the City on the Project, which affect the timing of Consultant's performance of the Services.
3.2.3 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City.
3.2.4 Substitution of Key Personnel. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a
3 threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City.
3.2.5 City’s Representative. The City hereby designates Matthew Baumgardner, or his designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Consultant shall not accept direction or orders from any person other than the City’s Representative or his designee.
3.2.6 Consultant’s Representative. Consultant hereby designates [___INSERT NAME OF CONSULTANT’S REPRESENTATIVE___], or his or her designee, to act as its representative for the performance of this Agreement (“Consultant’s Representative”).
Consultant’s Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant’s Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.
3.2.7 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.
3.2.8 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant’s failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub-consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner consistent with the standard of care set forth herein, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.
3.2.9 Laws and Regulations. Consultant shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in force at the time the Services are performed by Consultant and in any manner affecting the performance of the Project or the Services, including all applicable Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If the Consultant performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Consultant shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify and hold
4 City, its officials, directors, officers, employees and agents free and harmless, pursuant to the applicable indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. Consultant’s violation of such laws, rules and regulations shall also constitute a material breach of this Agreement.
3.2.10 Insurance.
3.2.10.1 Time for Compliance. Consultant shall not commence the Services or the Project under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience with insurer, coverage or other special circumstances.
3.2.10.2 Minimum Requirements. Consultant shall, at its expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement, the Services or the Project by the Consultant, its agents, representatives, employees or subcontractors. Consultant shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage:
(A) Minimum Scope of Insurance. (1) Commercial
General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis including products and completed operations, property damage, bodily injury and personal and advertising injury; (2) Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto) or if Consultant owns no autos, Code 8 (hired) and 9 (non-owned); and (3) Workers’ Compensation : Workers’ Compensation insurance as required by the State of California with Statutory Limits; and (4) Employer’s Liability Insurance.
(B) Minimum Limits of Insurance. Consultant shall
maintain limits no less than: (1) Commercial General Liability (CGL): No less than $2,000,000 per occurrence for products and completed operations, bodily injury, property damage and personal and advertising injury. If Commercial General Liability Insurance or other form with general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: No less than $2,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation: Workers’ Compensation limits as required by the Labor Code of the State of California with Statutory Limits; (4) Employer’s Liability: Employer’s Liability limits of no less than $2,000,000 per accident for bodily injury or disease. Employer’s Liability coverage may be waived by the City if City receives written verification that Consultant has no employees.
If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.2, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
5 3.2.10.3 Professional Liability (Errors & Omissions). Consultant shall procure and maintain, and require its sub-consultants to procure and maintain, for a period of five (5) years following completion of the Services or the Project, errors and omissions liability insurance appropriate to its profession. Such insurance shall be in an amount not less than $2,000,000 per occurrence or claim and $2,000,000 in the aggregate, and shall be endorsed to include contractual liability. If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.3, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
3.2.10.4 Insurance Endorsements. The insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Additional Insured Status. The Commercial
General Liability policy shall be endorsed to state that: (1) the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to liability arising from the work, Services, Project or operations performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work, Services. Project or operations; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Consultant’s scheduled underlying coverage. Commercial General Liability insurance coverage may be provided in the form of an endorsement to the Consultant’s insurance (at lease as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33 or CG 20 38; and CG 20 37 forms if later revisions are used).
(B) Waiver of Subrogation. Consultant hereby grants to
City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under said insurance policies set forth herein. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(C) All Coverages. Each insurance policy required by
this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except with written notice by certified mail, return receipt requested to the City; and (B) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.
3.2.10.5 Primary Coverage. For any claims related to this Agreement, the Consultant’s insurance coverage shall be primary insurance and primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the City, its directors, officials, officers, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of the Consultant’s insurance and shall not be called upon to contribute with it in any way.
6 3.2.10.6 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents and volunteers.
3.2.10.7 Deductibles and Self-Insurance Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. City may require Consultant to provide proof of ability to pay losses and related investigations, claim administration and defense expenses and costs within the retention. The policy language shall provide or be endorsed to provide that the self-insured retention may be satisfied by either the named insured or City.
3.2.10.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VII, authorized to do business in California, and satisfactory to the City.
3.2.10.9 Verification of Coverage. Consultant shall furnish City with original certificates of insurance, including all required amendatory endorsements (or copies of the applicable policy language effective coverage required by this provision) and a copy of the Declarations and Endorsement Page of the Commercial General Liability policy listing all policy endorsements to the City before the commencement of work under this Agreement. However, failure to obtain the required documents prior to the commencement of work under this Agreement shall not waive the Consultant’s obligation to provide them to the City. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, at any time.
3.2.10.10 Claims-Made Policies. If any of the policies provide coverage on a claims-made basis:
(A) The retroactive date must be shown and must be
before the date of this Agreement or the date work commences under this Agreement, whichever is earliest;
(B) Insurance must be maintained and evidence of
insurance must be provided for at least five (5) years after completion of the Services provided under this Agreement;
(C) If coverage is canceled, non-renewed, and not
replaced with another claims-made policy form with a retroactive date prior to the effective date of this Agreement or the date work commences under this Agreement, whichever is earliest, the Consultant must purchase extended reporting coverage for a minimum of five (5) years after completion of the Services under this Agreement.
3.2.11 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all
7 employees and subcontractors, such as safe traffic control, walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.
3.3 Fees and Payments.
3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" attached hereto and incorporated herein by reference. The total compensation shall not exceed [___INSERT WRITTEN AMOUNT___] ($[___INSERT NUMERICAL DOLLAR AMOUNT___]) without written approval of the City. Extra Work may be authorized, as described below, and if authorized, said Extra Work will be compensated at the rates and manner set forth in this Agreement.
3.3.2 Payment of Compensation. Consultant shall submit to City a monthly itemized statement which indicates work completed and hours of Services rendered by Consultant. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon.
3.3.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by City.
3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement.
Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City Manager.
3.3.5 Prevailing Wages. Pursuant to Downey Municipal Code Section 2935, the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects, shall apply to the Project. Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.
Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant’s principal place of business and at the Project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. If applicable, Consultant shall be registered at all times with the Department of Industrial Relations under the Public Works Contractor Registration Program for Labor Compliance.
8 3.4 Accounting Records.
3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.
3.5 General Provisions.
3.5.1 Termination of Agreement.
3.5.1.1 Grounds for Termination. City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time either for cause or for the City's convenience and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Consultant may only terminate this Agreement for cause upon giving the City not less than seven (7) calendar days' written notice.
Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation.
The City shall within fifteen (15) calendar days following termination pay the Consultant for all services adequately rendered and all reimbursable costs incurred by Consultant up to the date of termination, in accordance with the payment provisions of this Agreement.
The following reasons shall constitute "cause" for which either party may terminate this Agreement as provided herein:
• Substantial failure by the other party to perform in accordance with the terms of this Agreement and through no fault of the terminating party;
• Assignment of this Agreement or transfer of the Project by either party to any other entity without the prior written consent of the other party;
• Suspension of the Project or the Consultant's Services by the City for more than ninety (90) calendar days, consecutive or in the aggregate, without good cause;
• Material changes in the conditions under which this Agreement was entered into, the Scope of Services or the nature of the Project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes.
3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such Documents and Data and other information within fifteen (15) days of the City's request.
9 3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.
3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:
Consultant:
________________________________
________________________________
_________________,________ ______
Phone: (____) ____-_____
Fax: (____) ____-_____
Attn: ________________, __________
City:
City of Downey
11111 Brookshire Avenue
Downey, California 90241
Phone: (562) 904-7110
Fax: (562) 904-7296
Attn: Matthew Baumgardner, P.E., Director of Public Works
With a courtesy copy to:
City of Downey
City Attorney’s Office
11111 Brookshire Avenue
Downey, California 90241
Such notice shall be deemed made when personally delivered or when mailed, forty- eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
3.5.3 Ownership of Materials and Confidentiality.
3.5.3.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data
10 which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents and Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant.
Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.
3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.
3.5.5 Attorney's Fees. In the event of any litigation, whether in a court of law, administrative hearing, arbitration, or otherwise, arising from or related to this Agreement of the services provided under this Agreement, the prevailing party shall be entitled to recover from the non-prevailing party all reasonable costs incurred, including staff time, court costs, attorneys' fees and all other related expenses in such litigation.
3.5.6 Indemnification.
3.5.6.1 General Indemnification. Except as provided in subdivision
3.5.6.2 below which is applicable to “design professionals” only, Consultant shall defend (with counsel acceptable to City), indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged negligent acts, errors, omissions or willful misconduct of Consultant, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages and attorneys’ fees and other related costs and expenses. The Consultant’s duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Consultant shall defend, at Consultant's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Consultant shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any
11 and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials officers, employees, and agents or volunteers. Consultant shall not be obligated to defend, indemnify or hold the City harmless in any manner whatsoever for any claims or liability arising solely out of the City's own negligent acts, errors or omissions or willful misconduct.
3.5.6.2 Design Professionals. The provisions of this subdivision 3.5.6.2 shall apply only in the event that Consultant is a "design professional" within the meaning of California Civil Code section 2782.8(c). If Consultant is a "design professional" within the meaning of Section 2782.8(c), then, notwithstanding subdivision 3.5.6.1 above, to the fullest extent permitted by law (including, without limitation, Civil Code sections 2782 and 2782.6), Consultant shall defend (with legal counsel reasonably acceptable to City), indemnify and hold harmless City and City’s officers, officials, employees, volunteers and agents from and against any Claim that arises out of, pertains to, or relates to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Consultant, any subconsultant, subcontractor or any other person directly or indirectly employed by them, or any person that any of them control, arising out of Consultant's performance of any task or service for or on behalf of City under this Agreement. The Consultant’s duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Such obligations to defend, hold harmless and indemnify City or any City officers, officials, employees or volunteers shall not apply to the extent that such Claims are caused in part by the sole active negligence or willful misconduct of City or such City officers, officials, employees, volunteers and agents. Consultant's cost to defend City and/or City’s officers, officials, employees or volunteers against any such Claim shall not exceed Consultant's proportionate percentage of fault with respect to that Claim; however, pursuant to Civil Code section 2782.8(a), in the event that one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, Consultant shall meet and confer with City (and, if applicable, other parties) regarding any unpaid defense costs. To the extent Consultant has a duty to indemnify City or any City officers, officials, employees, volunteers and/or agents under this subdivision 3.5.6.2, Consultant shall be responsible for all incidental and consequential damages resulting directly or indirectly, in whole or in part, from Consultant's negligence, recklessness or willful misconduct.
3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements.
3.5.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be the courts in Los Angeles County.
3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.
3.5.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.
12 3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.
3.5.12 Assignment or Transfer. Neither party shall assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the other party. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.
3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party.
Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subcontractors of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.
3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.
3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit,
privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.
3.5.16 No Third-Party Beneficiaries. There are no intended third-party beneficiaries of any right or obligation assumed by the Parties.
3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.
3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry,
13 sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of any City Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.
3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self - insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.
3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.
3.5.22 Counterparts. This Agreement may be executed in counterparts, each of which shall constitute one and the same instrument.
3.5.23 Effect of Conflict.
In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, any of its exhibits, attachments, purchase order, or notice to proceed, the provisions of this Agreement will govern and control.
3.6 Subcontracting.
3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Consultant shall require and verify that all subcontractors maintain insurance meeting all of the requirements set forth in this Agreement. Consultant shall ensure that City is an additional insured as required in Section 3.2.10.4. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.
14 CITY OF DOWNEY, __________________________________, a California municipal corporation a __________________________________ and charter city
By: __________________________ By: ______________________________ Roger Bradley, City Manager [INSERT NAME & TITLE]