Item No.
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, P.E., DIRECTOR OF PUBLIC
WORKS/CITY ENGINEER
DATE: JUNE 25, 2024
SUBJECT: APPROVAL OF FISCAL YEAR 2025-2027 ON-CALL CONSTRUCTION
MANAGEMENT, INSPECTION AND MATERIALS TESTING SERVICES
EXECUTIVE SUMMARY
The City Council will consider approving staff’s pre-qualified list of on-call construction management, inspection and materials testing consultants to provide the City with construction management, inspection and materials testing services on an as-needed basis over a three-year period during Fiscal Year 2025-2027 with an option to renew the approved list for three additional one-year periods.
RECOMMENDATION
That the City Council:
1. Approve the following list of seven on-call construction management, inspection and materials testing consultants pre-qualified by staff: 1) FCG Consultants, Inc., 2) GK & Associates, 3) Onward Engineering, 4) Southstar Engineering & Consulting, Inc., 5) TKE Engineering, Inc. 6) Willdan Engineering and 7) Z&K Consultants;
2. Approve the Professional Services Agreement template for on-call construction management, inspection and materials testing services, and,
3. Authorize the City Manager, or his designee, to execute the agreement with the pre- qualified consultants on a per-project basis in the future and to execute any and all amendments to the agreement as deemed necessary for any future projects or tasks to be completed by said consultants.
BACKGROUND
The Public Works Department occasionally has a need to contract out construction management, inspection and materials testing-related services to professional engineering consultants to assist the department with the completion of various projects and tasks due to staffing shortages and a lack of in-house expertise and resources. Said professional services have been provided in the past by consultant teams for the following types of projects and tasks in support of the City’s Capital Improvement Program as well
FISCAL YEAR 2025-2027 ON-CALL CONSTRUCTION MANAGEMENT, INSPECTION AND
MATERIALS TESTING SERVICES
JUNE 25, 2024
PAGE 2
as to ensure compliance with plans and specifications, City standards and permit conditions:
o Street improvements and intersection widening
o Pavement and infrastructure preservation, rehabilitation and reconstruction o Water, sewer and stormwater infrastructure improvements o Water well and water treatment improvements
o Streetscape enhancements
o “Green Street” projects
o Drainage infrastructure
o Repair and new construction of sidewalk, curb ramp and other pedestrian circulation improvements
o Median Island, landscaping and irrigation construction o Traffic signal installations and upgrades
o Street lighting installation
o Fiber-optic communications
o Park improvements
o Inspection of improvements within the public right-of-way through permit
The City last procured the services of on-call construction management, inspection and materials testing consultants in 2018, and the respective professional services agreements of the on-call firms have since expired. Therefore, the City is ready to engage the services of new on-call consultants for the next round of said professional services on an as-needed basis over the next three years (Fiscal Year 2024-2025 to Fiscal Year 2026- 2027) with an option to extend an additional three years through 2030.
ANALYSIS
A Request for Qualifications (RFQ) for the subject professional services was published on Planet Bids on February 23, 2024. On March 15, 2024, a total of 15 Statements of Qualifications (SOQs) were received from consultants in response to the RFQ. An evaluation panel consisting of two Engineering Division employees and one Utilities Division employee was assembled to review the SOQs and evaluate and rank the consultants accordingly based on the following six evaluation criteria:
1. Project Understanding
2. Project Team
3. Experience
4. Capabilities
5. Local Sensitivity
6. Reputation
FISCAL YEAR 2025-2027 ON-CALL CONSTRUCTION MANAGEMENT, INSPECTION AND
MATERIALS TESTING SERVICES
JUNE 25, 2024
PAGE 3
The SOQs of the 15 firms were subsequently ranked on the above criteria, as shown in the following list:
Firm 1. Willdan Engineering 2. FCG Consultants, Inc. 3. Z&K Consultants 4. Onward Engineering 5. Southstar Engineering & Consulting, Inc. 6. GK & Associates 7. TKE Engineering 8. SA Associates 9. LAE Associates 10. Fountain Head 11. Transtech 12. Ramos CS 13. Anser Advisory 14. Murow Development Consultants 15. MKN Based on the rankings of the SOQs submitted by the 15 firms as shown, staff recommends the approval of the pre-qualified list of the top seven-ranked firms. Once approved, the seven firms will be sent Requests for Proposals (RFPs) on an as-needed basis as the needs arise for procuring the services of one of the firms to assist the City with construction management, inspection and/or materials testing services for a specific project or task. The proposals subsequently received will undergo a similar evaluation process, and the top-ranked firm, based on relevant experience, scope of work and competitive fee, will be selected. The SOQs of the seven pre-qualified firms are attached (Attachments A-G).
A professional services agreement based on the attached template agreement (Attachment H) will then be executed with the top-ranked firm, followed by the issuance of a purchase order to said firm. Staff recommends the approval of the attached template agreement. Upon approval of the pre-qualified consultant list and template agreement, staff will immediately begin preparing RFPs for construction management, inspection and/or materials testing services as needed. Proposed upcoming projects and tasks for which said services will be needed include the residential street pavement rehabilitation project, areas 5 and 7; alley improvements north of Foster Road, water well no. 9 rehabilitation, Western Avenue water system improvements, Woodruff Avenue pavement rehabilitation (Firestone Blvd.-Washburn Rd.), Firestone Boulevard at Lakewood Boulevard intersection improvements and the inspection of various improvements within the public right-of-way completed by permit.
CITY COUNCIL PRIORITIES
Efficiency & Adaptability
Quality of Life, Safety & Infrastructure
FISCAL YEAR 2025-2027 ON-CALL CONSTRUCTION MANAGEMENT, INSPECTION AND
MATERIALS TESTING SERVICES
JUNE 25, 2024
PAGE 4
FISCAL IMPACT
The on-call construction management, inspection and materials testing services will be funded through a variety of Capital Improvement Program as well as operating budget accounts, depending on the scope of work for each project and task.
ATTACHMENTS
Attachment A: FCG Consultants SOQ
Attachment B: GK & Associates SOQ
Attachment C: Onward Engineering SOQ
Attachment D: Southstar Engineering & Consulting SOQ
Attachment E: TKE Engineering, Inc. SOQ
Attachment F: Willdan Engineering SOQ
Attachment G: Z&K Consultants SOQ
Attachment H: Professional Services Agreement Template
PROPOSAL
to provide
Construction Management, Inspection and Materials
Testing Services
for
Telegraph Road Traffic Throughput and Safety
Enhancements Project
Capital Improvement project (CIP) No. 16‐05
Federal Project No. STPL‐5334(063)
Prepared for the
City of Downey
Prepared for the
City of Downey
November 9, 2020
Attachment A
TABLE OF CONTENTS
Construction Management, Inspection and Materials
Testing Services for the
Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2 Capital Improvement Project (CIP) No. CIP 16 – 05
Federal Project No. HSIPL – 5334(063)
Section 1: Cover Letter ................................................................................................................................................... 1
Section 2: Understanding of Need ............................................................................................................................................. 3
Section 3: Scope of Services ...................................................................................................................................................... 5
Section 4: QA / QC Plan ............................................................................................................................................................. 13
Section 5: Key Personnel .......................................................................................................................................................... 14
Section 6: Relevant Experience ................................................................................................................................................ 24
Section 7: Fee Proposal ............................................................................................................................................................ 29
Section 8: Schedule ................................................................................................................................................................... 30
Section 9: Certifications ............................................................................................................................................................ 33
Page | 1 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 1: COVER LETTER
SECTION 1: COVER LETTER
November 9, 2020
Attn: Mr. Edwin Norris, P.E.
Project Manager
City of Downey – Public Works Department
11111 Brookshire Avenue
Downey, CA 90241
Subject: Construction Management, Inspection and Materials Testing Services for the Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; Capital Improvement Project (CIP) No. 16 – 05; Federal Project No. HSIPL – 5334(063)
Dear Mr. Norris:
FCG Consultants, Inc. (FCG) is pleased to commit our services to the City of Downey (City) to provide Construction Management, Inspection and Materials Testing Services for the Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2.
FCG is a firm with extensive roadway and traffic signal improvement experience committed to providing the highest level of service in the most cost-effective manner possible. We will provide the City with the most experienced and motivated team that will pro duce the highest quality work and will become part of the City team in every aspect.
We are committed to quality work, efficiency in staffing and budgeting, and successfully delivering this project. Our team has been selected based on availability and relevant experience, full understanding of the scope of services, and knowledge of the needs of the stakeholders. The key staff proposed for this project have managed numerous projects like this and will apply this knowledg e and experience to hit the ground running. The individuals proposed have the availability, the qualifications, and in many cases the cross-training for both office and field positions to cost-effectively solve problems at any level. Our team has extensive experience working on public works projects that utilize Caltrans standards and procedures and the Local Assistance Procedures Manual.
FCG is no stranger to providing construction management and inspection services on federally funded projects located throughout California and has successfully serviced these projects to our clients’ satisfaction. We are committed to this project and propose a team that is available and local. Quality, safety, and a can-do attitude are key elements that will make this project a success. FCG is committed to quality work, safety in every instance, and an attitude that believes anything is possible. Our employees are familiar with the various standards and how to use them to bring about a successful project. Standards of quality are a priority for our staff and are thoroughly discussed, including the expectations of the Resident Engineer and requirements of the specifications, plans, and Construction Manual. Proper inspection and testing of the materials will yield expected quality materials and workmanship. Our contact information is as follows:
FCG Consultants Inc. - DBE
Contact: Maha Fakhouri, President & CEO, (714) 312-0317, [email protected] Address: 22885 Savi Ranch Parkway, Suite G, Yorba Linda, CA 92887 FCG is a woman-owned California corporation and certified Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) focused on providing client-driven solutions to assist clients in successfully delivering infrastructure projects.
Founded in 2009, FCG is headquartered in Yorba Linda, California, with a staff of 13 fully dedicated personnel providing construction engineering, construction management, and construction inspection services to clients throughout California. The firm specializes in project and construction management and inspection for various types of public works clients utilizing assorted standards such as Caltrans Local Assistance Procedures Manual, FHWA, Greenbook, and AWWA. FCG staff are highly experienced with inspection of roadway improvements, traffic signals, drainage systems, utilities, ADA ramps, retaining walls, MSE walls, soil nail walls, asphalt concrete (AC), Portland cement concrete (PCC) pavement, flood control channels, railroad construction, electrical, landscape, SWPPP, and safety. FCG will perform construction management, contract administration, construction inspection, daily reporting, coordination with stakeholders, review labor compliance reports, and quality assurance testing and acceptance,
Page | 2 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 1: COVER LETTER
Mr. A.B. Fakhouri, PE, QSD, is our proposed Project Manager|Resident Engineer and will be assigned for the duration of the project. He is a former Resident Engineer of Caltrans District 7 with more than 25 years of project management, design, and construction experience on transportation infrastructure, water infrastructure, and various other public works projects. He gained his experience working for Caltrans, county departments of transportation, transportation authorities, and local cities. His project management experience includes contract administration and on-site management involving multiple contractors, and he is highly experienced with the Caltrans Construction Manual and Local Procedures Assistance Manual. He will provide quality control over construction inspection services and will manage the contract and the budget.
Twining Testing Laboratories, Inc.
Contact: Talin Espinosa, Chief Strategy Officer, (562) 426-3355,[email protected] Address: 22883 East Spring Street, Suite 300, Long Beach, CA 90806 Twining Testing Laboratories offers comprehensive geotechnical/asphalt/concrete/soil consulting, inspection, and material testing services during construction. Their services are applied in planning, design, and construction of municipal and public works throughout Southern California. Twining has broad geotechnical and materials testing experience throughout Southern California.
Twining’s service includes quality assurance and compaction testing during grading and backfill, sampling and testing aggregate base; HMA; and PCC.
Availability & Commitment
FCG understands the importance of this project to the City. The City can be assured that FCG is dedicated to proposing professional team members that have the qualifications, experience, and skills necessary to successfully complete the scope of work on schedule and within budget. Having completed numerous roadway and traffic signal improvement projects in Los Angeles County, our public works experienced staff is available, ready to assist on this assignment, and able to handle several active projects concurrently should the need arise.
Disadvantages Business Enterprise (DBE) Goal
FCG exceeds the DBE participation goal of 75% by proposing a team of certified DBEs, bringing DBE utilization to 85.60%.
Subconsultants
FCG intends to perform materials testing services on this project utilizing the services of Twining Testing Laboratories, Inc.
We appreciate the opportunity to be considered for this contract. If you have any questions, or require additional information, please do not hesitate to contact me. I may be reached at 22885 Savi Ranch Parkway, Suite G, Yorba Linda, California 92887, Office:
714.312.0317, Fax: 714.312.0793, Cell: 714.883.8068 or [email protected] with any questions you may have.
Sincerely,
Maha Fakhouri
President & CEO
SECTION 2: UNDERSTANDING OF NEED
Page | 3 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 2: UNDERSTANDING OF NEED
Project Background
Telegraph Road is a six-lane major arterial and one
of most important and highly traveled roadways in
the area. Telegraph Road crosses the City of
Downey from the westerly city limit at the Rio Honda
Channel to the easterly city limit at the San Gabriel
River. Telegraph Road is a highly traveled road and
has a daily traffic volume of approximately 22,000-
28,000 vehicles per day with an average speed limit
of 45 MPH. Parking along Telegraph Road is
prohibited in the eastbound direction throughout the
entire project limits between the hours of 4-6 PM with
the exception of the portions located adjacent to the
apartment complexes, whereas parking is prohibited
in the westbound direction with the exception of
areas located adjacent to retail uses where on-street
parking is permitted for a maximum time of one hour
between 9AM and 10PM. The southern half
(eastbound direction) of Telegraph Road is located
in the City of Downey while the northern half of
Telegraph Road (westbound direction) is located in
the City of Pico Rivera. Adjacent land uses primarily
consist of single and multi-family residential,
medical, office, retail, lodging and industrial.
The City of Downey has performed a detailed analysis of the accident data conducted on Telegraph Road and it shows that there were collision patterns at both signalized and unsignalized intersections that could be improved through the construction of raised median islands traffic and traffic signal updates and installation of signal equipment as well as managing pedestrian and bicycle incidents with the help of accurate traffic counts of pedestrian traffic that would enhance safety. Such specific issues are needed to enhance traffic safety and improve operations on Telegraph Road were identified which qualified this project for funding through the federal Highway Safety Improvement Program.
Project Description
Per the project plans, the work to be performed under this Contract primarily consists of the construction of new raised median islands, improvements to the existing frontage road medians, repairs of existing parkway improvements, landscape and irrigation improvements and two traffic signal modifications.
The work shall include, but not limited to staking and surveying; traffic control; AC and PCC removals; HMA and RHMA paving; various PCC improvements such as sidewalk, driveway, raised median, curb ramps, cross gutters, gutters, median noses, local depressions; PCC retaining walls with hand railings; curb drains; decorative PCC pavement and pavers; median French drains; adjustment of utility covers; landscape and irrigation improvements, USA and all needed potholing for all the existing underground utilities shown or not shown on plans, all the equipment and material to be removed, the installation of conduits, installation of poles with new foundations and signal equipment, electrical service cabinets and traffic signal controller cabinets with foundations and equipment in accordance with the project plans and specifications; signage and striping.
Construction Staging and Schedule: The FCG Team has worked on several similar projects with similar features and requirements, and understand how contractors will plan to stage and schedule work for this project.
Typically, the Contractor would work on project items on the outside (Sidewalks, curb ramps, driveways, cross gutters, electrical, etc.) then construct the raised median and the finish the job with PCC and AC pavement and striping, all in one stage. However, since this project consists of two work areas on Telegraph Road, the Contractor may divide the work into two stages as shown in the proposed schedule (See Exhibit 1).
SECTION 2: UNDERSTANDING OF NEED
Page | 4 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
Construction Activities and Potential Issues and Recommendations The FCG team has reviewed the plans and specifications for this project and gained a thorough understanding of the work. Major anticipated construction activities include, but are not limited to:
1. Construction Staking and Surveying
2. Traffic Control, Public Convenience Safety.
3. AC and PCC removals
4. HMA and RHMA Paving
5. Raised Median Islands
6. Various PCC improvements (Sidewalk, curb, driveways, curb ramps, etc.)
7. Modifying Traffic Signal Complete Per Plan at Telegraph Road and True Avenue.
8. Modifying Traffic Signal Complete Per Plan at Telegraph Road and Birchbark Avenue.
9. Adjustment of Utility covers
10. Landscape and irrigation improvements
11. Signage and Striping
The FCG team has reviewed the project plans and specifications and found the following potential issues to be addressed for your review and consideration that will result in significant savings of time and cost to the City:
ISSUE RECOMMENDATION
Safety
Safety is the most important thing on any construction project. This includes, but is not limited to, pedestrians, motorists, bicyclists, contractor workers, inspectors, city and agency staff, and anyone in the vicinity of the project. The FCG inspector will enforce safety at all times, protecting all from harm due to construction activities.
Coordination
With SCE: Typically, coordination with utility companies takes time, especially with Southern California Edison (SCE). It is highly recommended that coordination with such agencies is done and completed prior to award of construction to avoid delays.
With Utility Companies: The FCG team will coordinate with Utility Companies for relocation of certain facilities and adjusting manholes and covers. FCG has worked on several projects that required coordination with a variety of utility companies.
With Contractor and Stakeholders: The FCG team will coordinate all work with the Contractor and the City. The Resident Engineer and Inspector will keep all parties (including City of Pico Rivera) involved of all issues and will conduct meetings to address all issues and copy all on correspondences.
Equipment Lead Time Approval of the submittals for the traffic signal equipment and gear should be made early on at the start of the job due to the long lead time on procuring those items.
Signal Pole Foundations
The plans call for new signal pole foundations to be installed near the location of the existing foundations.
Construction of new foundations in the same exact location cannot be done and the existing signal must remain operational; therefore, layout of the new foundations must be done as part of a field meeting in the presence of the City staff. The FCG team will exert a lot of effort to mitigate this issue.
Traffic Control & Public
Inconvenience
This project is approximately X miles long and both sides of Telegraph Road consist of many businesses, health care facilities, residences, and an LA Metro Yard which have one or more driveways that will be closed during construction. In addition, parking will be limited during construction of certain areas which will result in a great deal of inconvenience to the public. The FCG team will ensure full compliance to public notification, project plans and specs, MUTCD for traffic control, and coordination with all affected parties. The RE will ensure circulation of information in a timely manner for all work.
ADA Curb Ramps
The plans call for construction of several curb ramps and the FCG Team will visit the jobsite with the Contractor and participate in the layout process to ensure full compliance of all ramps. In addition, the bid item quantities show a total of 39 curb ramps where the plans call out for a total of 38 curb ramps.
SECTION 3: SCOPE OF SERVICES
Page | 5 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 3: SCOPE OF SERVICES
The FCG team has extensive experience managing federally funded construction projects as required by FHWA and Caltrans Local Assistance Procedures Manual (LAPM). We will take this experience and our methodology and use it to bring a successful completion to this project. The FCG team will be led by our PM|RE, Mr. A.B. Fakhouri, PE, QSD, who will be the primary contact for this project from the Notice to Proceed (NTP) until Project Acceptance. Mr. Fakhouri will coordinate all construction management, inspection, and materials testing work based on the project schedule and will ensure the team is performing work in accordance with the needs of this project. Mr. Fakhouri will work with the Inspector to setup the project files and folders electronically utilizing the Caltrans LAPM for the filing system. Secondly, Mr. Fakhouri will ensure full-time inspection and documentation is done properly by the Field Inspector with the help of the Office Engineer to ensure compliance with the project plans and specifications and other standards. In addition, Mr. Fakhouri will coordinate materials sampling and testing per the Quality Assurance Plan and will document all results. Finally, Mr.
Fakhouri will coordinate final inspection, punch list, as-builts, and project acceptance with the Field Inspector and Office Engineer to ensure full project compliance and to provide the City with a complete set of hard copies and electronic copies of all project documents utilizing the Caltrans LAPM and Construction Manual. The FCG team will perform construction management, inspection, and materials testing services in the following stages:
1. Pre-Construction
a. NTP and Move-In Period - Once the construction contract is approved, we will discuss the Project move-in period and start of construction with the Contractor. Once this discussion is complete, we will recommend to the City issuance of the NTP and establish the date of the first chargeable working day. This is recommended to maintain the Project schedule and provide the Contractor ample time to obtain permits and submit all necessary submittals prior to start of construction. A 20-day move-in period is recommended because it allows sufficient time to review submittals, especially for long lead items such as signal and lighting poles and equipment.
b. Pre-Construction Meeting - Once the NTP is issued, the FCG team will coordinate the pre-construction meeting by preparing a list of attendees, including, but not limited to, the Contractor, Designer, City, and utility companies. Prior to the meeting, the RE will prepare for the City’s review an agenda that identifies the following: documents required from the Contractor for supervision and safety, certified payroll requirements, materials sampling and testing criteria, and certificates of compliance for all materials. Following the meeting, attendees will receive meeting minutes, including a sign-in sheet, for their records. c. Coordination - FCG has successfully worked with many public works Contractors in Southern California and has developed strong working relationships based on trust and respect. The FCG team has the experience and capability of communicating and partnering with the Contractor and their sub-contractors. The FCG team will maintain a professional and a respectful relationship with the Contractor staff continuously. FCG specializes in the construction management and coordination of various specialty projects.
2. Utility Coordination
Coordination with third-party utilities holds a high risk of potential schedule delay. As a first order of business, our RE will work closely with the City, City Utilities Department, Liberty Utilities, SCE, the Gas Company, and the Engineer of Record to develop a comprehensive list of utilities and elements that will require relocation, abandonment, adjustment, and/or protection prior to construction. Utility requirements and durations will then be incorporated into the Special Provisions.
3. Project Coordination
Our PM|RE, A.B. Fakhouri, is highly qualified to effectively manage this Project as he has managed numerous similar projects in the past. He will act as the prime point of contact between the Contractor, the City, and the utility companies. FCG’s PM|RE will ensure timely coordination with property owners adjacent to the Project during the pre-condition survey, construction, and post-construction activities. Mr. Fakhouri will also maintain continuous communication with the City, keeping everyone informed as the Project progresses; maintain a close working relationship with all stakeholders and a cohesiveness within the CM team; and will be the primary source of communication for this project as he will be fully aware of all project activities, issues, and concerns.
SECTION 3: SCOPE OF SERVICES
Page | 6 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 a. Adjacent Residences – Telegraph Road is a major arterial which crosses several intersections per the plans. It’s imperative to address the proximity of certain residences with property lines connected to the proposed project. Construction work typically generates various nuisances that result in irritation by residents which ultimately results in complaints. Some of these nuisances are noise, dust, and travel delay due to lane closures. The FCG team will address these issues at the Pre-Construction Meeting and will request that the Contractor implement measures to address each of these issues throughout the life of the Project to minimize impact on the residents. FCG will provide sufficient information to the residents to ensure proper transfer of information continuously. This information will be passed on via notifications, hotline, public meetings, etc.
b. Adjacent Businesses - Each stage of construction is unique in terms of sequence, safety, convenience to the traveling public, and extensive coordination with stakeholders. Extensive partnering and coordination are needed with nearby businesses during business hours, as these immediately adjacent businesses will feel most impacted by the Project. We will coordinate with all businesses regularly through weekly and monthly meetings as needed. We will contact Owners and Managers of each establishment in the region and explain to them the nature of closures and detours, especially night and day delivery schedules to businesses within nearby shopping centers, as well as others. All team members are experienced with outreach participation. c. Bus Routes - Coordination with LA Metro Line 62 – FCG’s PM|RE will manage the Project’s coordination efforts with LA Metro, as needed. A critical factor for constructing this Project is to ensure conformance with all requirements due to the Project being constructed along a very busy route with a highly significant need for public transportation usage. It is imperative the work on this Project does not impact the pick-up and drop-off locations. The FCG team will work diligently to ensure the Contractor submits a comprehensive Traffic Handling Plan addressing all possible issues with performing work along Paramount Boulevard.
The team will continuously inspect the work to ensure traffic flow is not obstructed and traffic signs and devices are always secured and functional.
Our PM|RE has worked on various local projects with similar features and played a lead role in coordination with similar bus routes in the cities of Whittier and Norwalk.
4. During Construction Administration
As the pre-construction phase comes to an end, we will begin staffing for construction management and inspection based on the Contractor’s actual schedule of activities and staging of the work. The staffing will parallel the Contractor activities to ensure maximum efficiency in expenditure of the construction management contract with the City. When Project activity increases, we will add additional field staff as necessary. As we have demonstrated in the past, the FCG team is committed to reducing the Project duration, which will result in cost savings to the City. Additionally, we will review and monitor DBE requirements per Caltrans standards to ensure compliance.
a. Contract Administration – FCG has provided project staffing, managing several construction projects using the Caltrans Construction Manual and contract administration procedures their entire careers. As Former Caltrans Engineers, A.B. Fakhouri (PM|RE) and Dan Duarte (CI) will provide the City with a construction management team that has combined 55+ years of public works construction and design experience specifically using Greenbook and Caltrans Standards. b. Meetings - The FCG team will coordinate and conduct weekly progress and field meetings with the Contractor, design team, City, and any others, as needed. Our PM|RE will prepare the meeting agendas, which will include reviews of the Project schedules, a summary of submittals and Requests for Information (RFIs), unresolved issues, and new issues requiring follow- up. Additionally, our PM|RE will produce meeting minutes and distribute to all attendees. c. Submittals - The FCG team will provide the Contractor a list of submittals as per the Special Provisions, then perform a thorough, comprehensive review and approval of the Contractor’s submittals. We will work closely with the City to determine which submittals the design consultant will review, and which will be reviewed by the FCG team. A Submittal Log will be
SECTION 3: SCOPE OF SERVICES
Page | 7 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 developed, maintained, and tracked according to when they are received and returned to the Contractor. A copy of the Submittal Log will be included with each transmittal and discussed at the weekly meetings. Materials releases and certificates of compliance will be kept in the appropriate filing categories, and materials summary sheets will have a running total of materials used on the Project. Anticipated submittals include, but are not limited to, baseline schedule, SWPPP, concrete mix designs, asphalt mix designs, various traffic signal components, and various street lighting components. d. Request for Information - Our PM|RE will coordinate with the Contractor to submit all questions as RFIs. All RFIs will be reviewed and responded to in coordination with the City and the design team to ensure proper protocol is followed and sufficient information is relayed to the Contractor in response to each RFI. The Resident Engineer and Inspector will maintain a log and will provide to all weekly progress meeting attendees.
e. Traffic Management - The FCG team, PM|RE, and field staff will review and check traffic control daily and continuously monitor traffic control measures, ensuring all detour and construction signage is maintained, clean, and clear to the traveling public, including nighttime review for reflection and clarity. Our PM|RE will discuss traffic control plans at each weekly meeting and keep the City and the County informed of any traffic lane closures, ensuring strict compliance with local permit and contract requirements.
5. Project Progress and Payment
The FCG team will work with the City to review the
baseline schedule, look for issues, and make
recommendations to the City as appropriate. Such
recommendations will be based on logic and a
realistic schedule. Our PM|RE will propose
enhancements based on sequence, number of
working days, milestones, and key dates to ensure
development of an efficient and well managed
Project. The team will prepare independent monthly
estimates for the Project duration, monitoring both
the Project and contingency budgets. Our report to
the City will include amount paid to Contractor to
date, amount previously paid to Contractor, percent
complete of each bid item, executed change orders,
and retention withheld from each pay estimate. Our intent is to keep the City fully informed of the financial status of the Project. a. Pay item quantities will be measured daily and documented on daily reports. b. Quantity Sheets will be prepared with each pay estimate, with backup calculations. c. Change orders will be prepared and monitored, costs independently estimated and verified, and work documented daily on a separate daily diary with tentative agreements (if force account (T&M)). d. Our tracking system includes costs, including supplemental work and furnished materials. “The PM|RE will monitor the schedule, beginning with a thorough review of the baseline schedule submittal, and following with a review of the monthly schedule updates in comparison to look-ahead schedules and daily diaries.” e. Schedule Control - The FCG team will produce and analyze schedules from the perspective of an owner and contractor to ensure timely or early completion of the Project. We will ensure Contractor compliance with the requirements of the monthly schedule updates as required in the special provisions and will closely monitor the critical path to avoid delays and subsequent consequences. Our analysis of the Contractor’s schedules will be done on a weekly basis in conjunction with Inspector’s daily diaries, meeting minutes, submittal logs, and other Project records. This schedule analysis approach will provide the City with notice of any potential delays prior to issuance by the Contractor to allow time for appropriate response.
FCG will enforce the scheduling requirements in the Special Provisions, which will be key to placing the City in a positive position in case of claims. It is recommended that the Special Provisions require the Contractor to submit Time Impact Analysis (TIAs), together with costs for any change orders, to include time requirements of when cost proposals are due. f. Budget Control and Tracking - Our PM|RE will prepare and submit a monthly budget report to the City’s management with an accurate status of the Project budget and schedule. This report will contain, but not be limited to, schedule status updates, work operations, submittals, RFI and change order logs, and Project issues.
SECTION 3: SCOPE OF SERVICES
Page | 8 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
6. Contract Change Orders and Claims
The FCG team will assist the City in controlling the costs of the Project and the factors that may escalate Project costs. Upon submittal, Contractor’s change requests will be reviewed for merit. We will hold the Contractor to providing the items in the scope of work bid, without generating unnecessary changes to increase the Project cost. The FCG team’s PM|RE will work with the City’s Project Manager to establish levels of financial authority from the Project Manager up the chain of command to provide guidelines for change authorization. FCG will approve as agreed-upon by the City. a. Cost Estimating and Scheduling - All change orders will be estimated independently of the Contractor’s proposed cost prior to approval by our PM|RE and submitted for approval to the City. We will comply with the Caltrans Construction Manual and LAPM. The FCG team is comprised of highly qualified scheduling and claims avoidance experts that will analyze and produce schedules from the perspective of an owner and a Contractor. Our experts will ensure the Contractor is complying with the requirements. Our approach includes, but is not limited to, weekly analysis of schedules, Inspector’s daily diaries, meeting minutes, and Project files to provide the City notice of any potential delays. b. Claims Avoidance and Mitigation - The FCG team’s renowned claims division and our claims experts have a proven track record with Caltrans and other public agencies on similar projects. We will monitor all site records of events, labor, materials, and equipment for potential claims or delay issues. This data will be essential when analyzing a Contractor’s claim. Our team will address every issue that will contain all relevant RFIs, change orders, correspondence, pictures, Inspector’s dairies, cost analysis, and schedule analysis. Our objective will be to minimize misunderstandings by providing clear and concise analysis of all major Project issues.
c. Project Records and Filing System - FCG’s PM|RE and Office Engineer (OE) will establish and maintain a filing system in hard copy as well as electronically, using the Caltrans Construction Manual as a guideline to ensure compliance with FHWA requirements. FCG typically utilizes the Caltrans filing system on all projects. All hard copy files will be scanned as PDF files and stored digitally on a server with a filing structure duplicating the hard copies. Additionally, FCG’s OE will upload the electronic data documentation to the City’s on-line file directory. Submittal and RFI logs will be kept and tracked according to when they are received from and returned to the Contractor together with their approval or response status.
Materials releases and certificates of compliance will be kept in the appropriate Caltrans filing categories, and materials summary sheets will be developed to keep a running total of materials implemented. d. Partnering - The FCG team is a firm believer in partnering and has actively participated in partnering sessions on numerous past projects. We will again accept responsibility for coordinating partnering sessions for the Project team, including planning with the City’s preferred Partnering Facilitator. e. Quality Assurance Program - The FCG team’s extensive Caltrans experience, beginning with the PM|RE, Design Review team, and carrying through our field personnel, will ensure the requirements of the Caltrans Quality Assurance Program Manual are met. Each of our proposed staff for the Project possess years of recent Caltrans construction experience. f. Labor Compliance and Certified Payroll - FCG’s OE will verify Contractor and subcontractor labor compliance during the Project, including non-working days. This includes reviewing certified payroll records for compliance with Davis-Bacon prevailing wage and overtime requirements. Our field personnel will perform employee interviews to ensure the actual wages meet the stated wages on the certified payroll. If necessary, we will notify the Contractor of any issues, and follow through until the issues are resolved.
7. Construction Inspection
The FCG team field personnel proposed for the Project can perform more than one role on any project and can assist each other when needed. This provides efficiencies for the City, as the FCG team possesses the versatility and technical knowledge of multiple aspects of civil and electrical construction. However, the FCG Team has included resumes of highly experienced inspectors (As- Needed) to supplement the proposed inspector and will only be used if the City requires them. The As-Needed backup inspectors are capable of performing Civil, Electrical, and Landscape inspection.
Our proposed team are cross trained and well diversified in the work and can all cover each other’s work and duties as well. Our proposed Inspector will perform the following tasks:
SECTION 3: SCOPE OF SERVICES
Page | 9 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Construction Inspection Tasks
1. Become familiar with and review plans, specifications, construction-related documents, traffic control plans, construction schedules, construction sequences, and other agency permit requirements.
2. Photograph, log, and pre-work video prior, during, and after construction.
3. Attend pre-construction meetings and present special concerns, if any.
4. Interpret plans, specifications, and regulations and ensure the Contractor is following their contract. Provide inspections to ensure the Project is constructed accordingly.
5. Direct and notify construction Contractor about non-compliance and correct issues upon discovery.
6. Maintain daily diaries, photographs, and video (as needed) reflecting site and weather conditions, traffic control measures, labor, equipment and materials, quantity of work, and major incidents/safety violations.
7. Review construction progress schedules regularly. Verify schedules coincide with Project milestones, identify deviations, and ensure corrective actions are taken to bring project back on schedule.
8. Provide complete measurements and calculations to administer progress payments and make recommendations for payments.
9. Review soil compaction and materials testing certifications of compliance.
10. Ensure the Contractor does not install materials without approved material testing certifications. Any failed tests shall be reported, and the Contractor directed to take corrective action.
11. Monitor Contractor’s utility coordination to minimize utility conflict delays and potential need for relocations.
12. Attend progress meetings to communicate, coordinate, and resolve any jobsite issues or problems that may arise.
Prepare and submit to Contractor a “Weekly Statement of Calendar Working Days” report.
13. Conduct field construction employee interviews to comply with the Federal, CDBG, Equal Employment Opportunity Law, and Davis Bacon Act.
14. Coordinate access to adjacent businesses and residents during construction with the Contractor. Coordinate mitigation of construction impacts with the Contractor, City, and other agencies.
15. Provide inspection of traffic control, channelization, and all other traffic-related work.
16. Ensure conformance with plans, specifications, applicable laws, and codes.
17. Observe construction safety, public safety, and convenience, and report issues to the City and Contractor.
18. Monitor compliance with the City’s National Pollutant Discharge Elimination System (NPDES) Permits and requirements, as well as all other local, state, and federal laws and regulations.
19. Inspect for compliance with the Project SWPPP Program including monitoring QSP and/or QSD duties as outlined in California State Water Resources Control Board, Storm Water General Permit, and contract.
20. Monitor compliance with the City’s Construction Demolition and Recycling Ordinance.
21. Maintain data for change orders and record information regarding time of dispute, time of notification by the Contractor, and action taken by the Inspector.
22. Ensure the Contractor submits certified payroll reports with monthly progress payment requests. Review reports for compliance with federal and state prevailing wage regulations.
23. Prepare and transmit to the Contractor all Project-related correspondence. All correspondence sent to and received from the Contractor shall be copied and transmitted to City.
24. Coordinate the preparation and submittal of as-built plans to the City upon project completion.
25. Prepare preliminary and final punch-list and follow through until completion.
SECTION 3: SCOPE OF SERVICES
Page | 10 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 a. Field Inspection - The FCG team will provide personnel to perform full-time quality assurance inspection of the following Project elements that require specific skill sets:
Dan Duarte is experienced with civil work and will partner with the Contractor to resolve problems as quickly as possible and at the lowest level possible. Key to our success has been our ability to create a responsive relationship with the Contractor and our client, resulting in a successful, more efficiently run project. Our Inspector will utilize the CPM and look-ahead schedules to properly advance the construction effort. All phases of construction and all work will be inspected for conformance with contract plans, specifications, and current specified and pertinent standards. Inspection services, testing, and Project-wide quality assurance will be performed in full conformance with the Caltrans Construction Manual and LAPM. Our goal is to stay on track by doing it right the first time and eliminating time-delaying, corrective work. Proactive approaches with the Contractor’s personnel have been instrumental in achieving this goal. b. Safety Enforcement - The FCG team is thoroughly familiar with California Construction Safety Orders (Cal OSHA) and traffic control practices as specified in the Work Area Traffic Control Handbook (WATCH Manual), as well as the Manual of Uniform Traffic Control Devices (MUTCD). The Contractor will be required to prepare and submit a Safety Plan for its operations. The Safety Plan will be reviewed by the PM|RE and the FCG team. Deficiencies will be noted, and upon correction, the plan will be approved.
Public Safety is extremely important to the FCG team. The two most pressing safety issues during construction on this Project will be pedestrian and traffic handling during staged construction. All FCG team staff working on the Project will participate in weekly safety meetings headed by the PM|RE and presented to all. In addition to conducting our own internal safety meetings, we will attend the Contractor’s tailgate meetings, perform weekly safety inspections, and provide those findings to the Contractor. c. SWPPP Enforcement - Our PM|RE is a certified QSD and has experience managing construction work under the MS4 and new permit requirements.
We will provide weekly or as-needed monitoring of field conditions. It is our practice to handle stormwater compliance with the same level of attention as safety. We will review the Contractor’s SWPPP submittal and ensure all records are kept up to date, all BMPs are in place and maintained, and “housekeeping” is maintained to protect regulated species. d. Environmental Compliance Enforcement - The FCG team will ensure compliance with the environmental and resource agency requirements contained in the Project permit. Our team will create a log of requirements of the various permits to ensure all permit conditions and mitigation measures are met. Our field personnel will ensure Contractor complies with the permit conditions, and mitigation work will be tracked and reported on daily inspection reports with photos (per the Caltrans Filing System).
8. Materials Testing
The scope of work defined for the Project requires the FCG team provide professional services for materials sampling and testing.
The FCG team has met the City’s need with the addition of Twining, who gives the FCG team the professional capability of carryi ng out the scope of work with confidence. Twining is a highly reputable Materials Testing firm with several accredited laboratories and staff working throughout Southern California providing clients with excellent service utilizing various test methods. The FCG team will coordinate materials sampling, testing, and reporting and will maintain logs of all data in the project files as well as pass along pertinent information to the Contractor and the City. The FCG team will ensure that sampling and testing of specimens are done properly at all times to ensure top quality in the materials.
SECTION 3: SCOPE OF SERVICES
Page | 11 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Materials Testing|Geotechnical|Source Inspection – FCG team member Twining will provide a Materials Testing Project Manager as well as experienced personnel, equipment, and facilities to perform quality assurance (QA) geotechnical and materials testing services. Twining’s lab is located within the City of Chino, which makes it easier to obtain samples, perform timely tests, and provide the Contractor with faster test results.
Twining’s materials technicians will sample and test all materials in accordance with the most current and appropriate California Test Methods (CTM’s), or ASTM test methods when specified. Twining’s Caltrans- certified laboratory, which is only minutes from the Project site, and field technicians will be used to ensure structure and roadway construction work conforms to Caltrans standards, specifications, and special provisions for material quality and workmanship. The test results will be transmitted immediately to the PM|RE and Office Engineer to expedite work on the Project. The FCG team PM|RE will ensure testing logs and summary sheets are developed and maintained for the various materials tests, and that these logs also include resolution of any failed tests, to include re-tests. Turn-around times for testing will also be controlled by proactive coordination between the PM|RE and inspectors, and Twining’s field testers and lab personnel.
A list of testing, inspection, and pavement related services Twining provides includes:
Materials Testing
Reinforced Concrete
Concrete Mix Design Reviews
Aggregate Quality Tests
Asphalt Concrete Quality Tests
Asphalt Concrete Mix Design
Portland Cement Mis Designs & Quality Tests
Masonry Units & Quality Conformance Tests
Reinforcing Steel Quality Tests
Structural Steel Quality Tests
Reinforcing Steel Splice & Coupler Tests
Welder Qualification Tests
Geotechnical & Soil Tests
Construction Inspection
Reinforced Concrete
Reinforced Welding
Batch Plant
Reinforced Masonry
Structural Steel & Erection
Structural Steel Shop Fabrication
Structural Steel Fireproofing
Roofing & Waterproofing
Pavement Engineering
Evaluation of Existing Roads & Highways
Determine Strength of Structural Sections
Pavement Condition Index Evaluations
Pavement Management Services
Pavement Rehabilitation Recommendations
New Construction Design Recommendations
Rehabilitation/New Construction Techniques
Rapid Set Concrete Pavement Testing
Anchor & Bolt Tension Testing
Ultrasonic Non-Destructive Testing
9. Post Construction and Project Close-out
The FCG team will provide the appropriate level of inspections to ensure all punch-list work is completed, safety issues are resolved, final acceptance of the project is granted, and all necessary paperwork and reports are completed to the standards of the City. The FCG team will assist the City with completing all close-out forms per Chapter 17 of the Caltrans LAPM, provide the City with hard and electronic copies of the project files, and all materials records after acceptance.
Available Materials Testers
Eddie Perez – Caltrans & ASTM Certified
Steve Coldiron – Caltrans & ASTM Certified
Darren David – Caltrans & ASTM Certified
SECTION 3: SCOPE OF SERVICES
Page | 12 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 a. Tools - Our team members have wide and varying experience with software and various internet tools such as SharePoint, Dropbox, Primavera, Procore, Microsoft Project, etc., that help them with documentation, tracking, and project controls. During the course of business, residents and property owners may be impacted by construction through the closure of their driveway entrances. As needed, the FCG inspector will communicate and coordinate with all affected property owners and residents and keep them well informed of the status of the project to allow them to anticipate activities, deliveries, and to project time of completion.
b. Government Agency Experience - For the past 10 years, FCG’s construction management team has built an impressive portfolio of successfully completed construction management projects having worked directly with several government agencies in Southern California as either a prime or subconsultant. In addition, our individual team members have built strong, trust-based relationships with owners/agencies such Caltrans Districts 6, 7, 8, 11, 12, and 59; transportation agencies including LACMTA and SBCTA; the counties of Los Angeles, Orange, San Diego, and Riverside; as well as a multitude of local cities and municipalities including Downey, Norwalk, Whittier, South Gate, Burbank, Moorpark, Corona, Fontana, La Mirada, Culver City, Glendale, San Fernando, Irwindale, San Diego, and multiple cities throughout the desert region. c. As-Built Plans - The FCG team will maintain as-
built plans on an on-going basis throughout the
duration of the Project. Red-lined plans will show
all changes made to the contract plans, will
present the name of the change approver, and
CCO number. We will also ensure the Contractor
is tracking as-builts, and at the end of the Project,
our construction management team will combine
all information into one complete set of drawings.
d. Documentation - The FCG team will maintain a
daily log that includes weather conditions, work
status, location and type of work performed, trade
labor, equipment, and materials. Each inspector
will take daily photos of work and accurate
measurement of quantities. The FCG team is
highly experienced with documenting and
maintaining project files per the Caltrans LAPM.
All project files will be kept and maintained by the PM|RE and OE regularly. The FCG team will setup project folders for all hard copies of project documents and an online storage link to all files. The FCG team will provide the City with a link to the online files and a directory to review and obtain project files as required. e. Federal Review - The FCG team has participated in several federal reviews with Caltrans and the Local Assistance Office and presented the project documents impressively every time. The PM|RE is a former employee of Caltrans in Los Angeles and is very experienced with documentation of construction projects per the LAPM. Mr. Fakhouri will ensure all project files are maintained per the LAPM in project folders and in electronic form. Mr. Fakhouri will represent the City throughout the entire project, from pre-construction, during construction, and through post-construction.
Our Resident Engineer, A.B. Fakhouri, has worked on several Federally-Funded projects and participated in several Project Reviews; Pre-Construction, Mid-Construction, and Post-Construction with representatives from Caltrans and FHWA and he will ensure that all project documentation is per the Local Assistance Procedures Manual and FHWA Requirements to ensure full compliance and proper finance management by the City. Mr. Fakhouri will provide the Contractor with required documents to use on the project; LAPM and City of Downey forms to ensure compliance.
SECTION 4: QA / QC PLAN
Page | 13 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 4: QA / QC PLAN
Quality Management Plan
FCG has a time-tested quality management plan we apply to our construction management and inspection services. Our program and construction management personnel receive procedure and industry-related continuous improvement training on a regular basis.
FCG stakes its reputation on meeting and exceeding the expectations of our clients; therefore, deliverables are monitored by senior FCG staff and corrections are implemented prior to distribution on the Project whenever possible. FCG corporate and construction management systems allow for real-time monitoring of client contract budgets, sub-consultant budgets, and invoice concerns, as well as key project deliverables and time, budget, and quality sensitive issues. This minimizes the potential for problems and mitigates risks to schedule and budget.
Working within the guidelines of the City’s Quality Assurance Plan (QAP), our PM|RE, A.B. Fakhouri, PE, will oversee the team’s quality control efforts with materials sampling and testing, survey staking and control, and construction inspection services. The FCG team is committed to providing the highest quality people and services to the City. The QA team will conduct regular quality improvement sessions to train staff and provide continuous updates on industry practices, directives, and changes in standard plans and specifications. Our PM|RE will continuously review the jobsite and documentation prepared by our staff to ensure compliance with Caltrans Construction Manual requirements.
a. Effective Communication – The FCG team has equipped our field staff with laptops, air cards, and smart phones to effectively perform the work and stay connected. These tools provide access to necessary online resources and allow our field staff to work efficiently and communicate with all Project staff. In addition, we will utilize Dropbox to maintain electronic files. FCG has customizable Project Status Reports that are delivered to various levels of client management at the requisite frequencies to ensure stakeholders are kept up to date on possible issues and solutions. b. Communication with the City of Downey - Our PM|RE will provide a daily status update including issues and photos. This service will efficiently keep City staff up to date on Project progress.
The FCG team can provide Public Outreach staff to provide the public with accurate information as needed.
c. Partnering – Although partnering is not mandatory on construction projects, it is highly recommended to establish a good working relationship between stakeholders and the Contractor. Partnering has proven to be a productive tool that addresses potential issues, allows stakeholders to engage effectively with one another, and ultimately creates a comfortable atmosphere between
stakeholders and Contractor staff. The FCG team has participated in several partnering sessions with contractors with proven and successful results.
FCG assisted Caltrans District 7 on the
I‐5|Carmenita Interchange Project
to win the 2017
California Transportation Foundation
Large Project of the Year Award.
“Partnering is essential for all construction projects, because it produces effective communication and better work quality as it unites the Contractor with City Staff and representatives to achieve success on projects.”
SECTION 5: KEY PERSONNEL
Page | 14 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 5: KEY PERSONNEL
QUALIFICATIONS, RELEVANT EXPERIENCE & REFERENCES
Firm Profile
FCG is a woman-owned California S-Corporation certified as a SBE/DBE.
Our firm is structured to serve public agencies and our management team has developed a high proficiency for balancing resources to successfully deliver capital improvement projects.
Founded in 2009, has FCG provided expertise in project management, construction engineering and management, inspection, office engineering, materials testing, labor compliance, and contract administration to its various clients since its inception. FCG serves its clients with 13 employees from its Yorba Linda office.
FCG staff have worked on a large variety of federally and locally funded projects with many agencies such as cities, counties, state departments, water agencies, irrigation districts, railroads, airports, school districts, and private developers utilizing various standards, including Caltrans, Federal, State, County of Los Angeles, various cities and water districts, Water Agencies’ Standards (WAS), California Manual of Traffic Control Devices (CAMUTCD), Standard Specifications for Public Works Construction, APWA, and other applicable standards and specifications.
Financial Condition
FCG is financially secure and has not filed for, nor does it have plans to file for, bankruptcy. In addition, FCG has no pending litigation, planned office closures, impending mergers, etc. Risk management and mitigation, as well as strict adherence to safety and best practices, ensure that FCG can remain strong.
We firmly believe that with each passing year and the completion of each job for our various clients, the satisfaction of our clients will begin to further reflect the condition of our company as well as our ability to provide our clients with the professionalism and superior customer service they deserve.
Experience Performing Work of a Similar Nature
FCG staff have worked on several federally funded projects within Los Angeles County and for Caltrans District 7 Office of Local Assistance under the supervision of Mr. Mazen Dabboussi, Local Assistance Area Engineer. FCG staff are highly experienced with the Caltrans LAPM, Caltrans Construction Manual, FHWA Guidelines, and Greenbook Standards. FCG has worked on several relevant federally funded projects performing construction management and inspection services.
Qualifications of Proposed Personnel
FCG proposes a highly qualified, local, and available team for this project that have relevant public works experience with clients such as the cities of Whittier, Downey, Moorpark, Burbank, Corona, and Newport Beach, as well as the County of Los Angeles Department of Public Works and Caltrans District 7. Led by our PM|RE, A.B. Fakhouri, PE, and supported by Dan Duarte (Construction Inspector) present a construction management team with extensive public works construction and design experience specifically using Caltrans and Greenbook standards. Mr. Fakhouri is a former Resident Engineer of Caltrans District 7 with more than 25 years of experience in project management, design, and construction management for transportation, water, and public works infrastructure projects. He will be the main point-of-contact for FCG’s services and will be directly responsible for managing the contract.
Our proposed Construction Inspector, Mr. Dan Duarte, more than 30 years of diversified civil and electrical inspection projects.
Experience includes traffic control, utilities construction and relocation, grading and roadway excavation, ADA ramps, sidewalks, driveways, HMA and JPCP pavement, minor concrete, drainage, minor structures, electrical, landscape, striping, and more. He has performed inspection services for the City of Downey including the Woodruff Avenue Traffic Signal Fiber Optics Communication System and Upgrades Project.
Our team is available to the City of Downey
and knowledgeable in the areas of grading,
street paving, traffic signal, electrical, dry
utilities, Federal and State inspection and
administration, budgeting, project
coordination, traffic engineering, striping,
storm drains, hydraulics, construction
methods, observation and materials testing,
utility and outside agency coordination, project
close‐out, safe work zones, QSP/QSD, MS4
permit compliance, and general construction
management, inspection, and administration
construction projects.
SECTION 5: KEY PERSONNEL
Page | 15 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 The FCG team is committed to quality work, efficiency in staffing and budgeting, and delivering a successful project. FCG staff ensures this by making sure our team is selected based on availability and relevant experience, full understanding of the scope of services, and knowledge of the needs of the stakeholders. We realize our people are our greatest strength and therefore our greatest asset.
Our success is based on our hiring the best people to produce the highest quality results at the most reasonable price and continues through our internal comprehensive training program that can get inspectors up to speed on any work assignment and in any work environment, concluding with our quality maintenance processes. This training program enables us to propose cross-trained staff that can cover multiple disciplines of the work, i.e., structures and roadway, electrical and landscape, etc. Cross-trained staff are key to efficiently budgeting for our services and providing clients with competitive fees.
Our key staff have managed numerous projects like this one in both prime and subconsultant roles and can apply this knowledge and experience to hit the ground running. These individuals have the availability, the qualifications, and in many cases the cross-training for both office and field positions to cost-effectively solve problems at any level. Our team has extensive experience working on public works projects that utilize Caltrans standards and procedures, Caltrans LAPM, and Greenbook standards.
Subconsultants
Twining will provide the materials sampling and testing as needed on the project. Their services will be coordinated by our PM|RE who will work with the Contractor daily and ensure the Contractor is submitting timely pour notices to setup a materials technician to be at the batch plant and onsite to perform the sampling and testing of all materials. Twining’s materials technicians will sample and test all materials in accordance with the most current and appropriate CTMs or ASTM test methods when specified. FCG has worked on several projects including federally funded project with Twining such as:
City of Simi Valley, West Los Angeles Avenue Widening City of Simi Valley, FY 2019‐20 Minor Street Rehabilitation City of Simi Valley, FY 2018‐19 Annual Minor Street Rehabilitation City of Santa Clarita, Newhall Ranch Road Bridge Widening City of Santa Clarita, 2018‐19 Annual Overlay Project NO. M0128 County of Ventura, Yerba Buena Road South Resurfacing County of Ventura, Bike Lane Projects (Rice Road, Casitas Vista Road, Potrero Road, Sespe Street, and Pasadena Avenue)
County of Santa Barbara, Isla Vista Sidewalk Improvement Project City of Pasadena, Orange Grove Blvd Resurfacing
City of Moreno Valley, Various Street Rehabilitation
City of Westmoreland, North Center Street Pavement Rehabilitation
SECTION 5: KEY PERSONNEL
Page | 16 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Organizational Chart
FCG has assembled an in-house team of experienced construction management and inspection professionals that will successfully deliver this project on time and within budget. The organizational chart below shows our project team and the lines of communication between team members.
Backup Electrical/Construction Inspectors (as needed)
David Molino – Electrical/Construction Inspector
Anthony Moussa – Electrical/Construction Inspector
Client Testimonials
“I would like to start by saying, to Mr. Fakhouri’s credit; the project was completed on time and within budget… Throughout our working relationship, Mr. Fakhouri has demonstrated good engineering knowledge, judgement, and skills combined with practical application in his problem solving and partnering… In closing, Mr. Fakhouri was fair yet firm when dealing with the contractor.” - Arsanious Hanna, PE, City of Irwindale
“I had the pleasure of working with Mr. Fakhouri and FCG this year on the I-15 Rehabilitation and Widening Project. His willingness and ability to work with Caltrans and his adaption to changes as needed were vital to a very successful project. He is an individual who is willing to go the extra mile.”
- Fred Alipanah, PE, Caltrans District 8
The key personnel proposed for this project will be available to the extent proposed for the duration of the required services. No person designated as “key” will be removed or replaced without the prior written concurrence of the
City of Downey.
City of Downey
Edwin J. Norris, PE
Deputy Director of Public Works
Project Manager/Resident Engineer
A.B. Fakhouri, PE, QSD
FCG
Dan Duarte FCG
Richard Shirley FCG
Construction Inspector
Materials Testing
Twining Inc.
Various Field & Lab Staff
Office Engineer (as needed)
Samar Alfakhouri
FCG
SECTION 5: KEY PERSONNEL
Page | 17 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 A.B. FAKHOURI, PE, QSP
Project Manager/Resident Engineer
Mr. Fakhouri is a Registered Professional Engineer licensed in the State of California, and a former Resident Engineer of Caltrans District 7, Los Angeles, CA. He has worked on various interchange projects of similar nature that included bridge demolition and widening, interchange widening, relocation of utilities, electrical, 55-hour closures, and more. As a Project Manager, duties included, but were not limited to, interfacing with clients, managing and training personnel, managing subconsultants, performing construction management, and construction inspection. As a Resident Engineer, duties included identifying problems and recommending solutions, ensuring compliance with safety requirements and contract provisions, preparing calculations, reports, and correspondence, reviewing submittals and RFI’s, change orders, conducting meetings, coordination, overseeing inspection, ensuring compliance to safety, SWPPP and labor laws. Mr. Fakhouri is knowledgeable in all Caltrans policies, procedures, and has the ability to satisfy the client with high-performance, high-quality staff at a moment’s notice.
RELEVANT EXPERIENCE
I-605/Live Oak Avenue Ramp Widening & Improvements Project – City of Irwindale, CA Project Manager/Resident Engineer: This Federally-Funded project consisted of a ramp widening and various improvements within Caltrans and City right-of-way. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, Edison service connections, drainage, landscaping, and striping. Duties included construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), daily diaries and quantities, and daily photos; coordinating materials testing and lane closures; performing document control; and reviewing contractor as-builts. In addition, project involved coordinating traffic signal turn and synchronization with Caltrans Traffic Operations and City of Irwindale Traffic Consultant. Project Cost: $2M.
Foster Road Side Panel Replacement Project –City of Norwalk, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of various improvements including reconstruction of side panels, curb and gutter, ADA ramps, sidewalk, lighting, traffic signal, Edison service connections and drops, HMA pavement, traffic control, and striping. Duties included, but were not limited to, construction management and inspection of various items of work, office engineering, conducting meetings, review submittals and RFI’s, CCO’s, daily diaries and quantities, daily photos, coordinating materials testing, quality assurance, coordinating lane closures, filing documents, and as-builts. Project Cost: $1.8M.
AC Overlay on Gabbert Rd, Poindexter Avenue, Spring Road and Princeton Avenue - City of Moorpark, Moorpark, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of major roads grind and overlay asphalt paving, curb ramps, materials testing, surveying and electrical. Duties included, but were not limited to, construction management and inspection of various items of work, office engineering, conducting meetings, review submittals and RFI’s, CCO’s, daily diaries and quantities, daily photos, coordinating materials testing, quality assurance, coordinating lane closures, filing documents, and as-builts. Project Cost: $500K.
Beverly Boulevard Traffic Safety and Lighting Improvements Project - City of Whittier, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of the construction of a raised median, replacement of concrete pavement, and other improvements. Work included, but was not limited to, traffic control, removals, concrete and asphalt paving, flatwork, street lighting, a pedestrian crossing, landscaping, and striping. Duties included construction management and inspection of various items of work; office engineering and document control; facilitating meetings; coordinating materials testing and lane closures; and reviewing submittals, RFIs, CCOs, daily diaries and quantities, daily photos, and contractor as-builts. Project Cost:
$2.2M.
Alondra Boulevard Roadway Improvements - City of Norwalk, Norwalk, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of widening and rehabilitation of Alondra Boulevard from Pioneer to Shoemaker. Duties included, but were not limited to, inspection of traffic control, signage, drainage, electrical, traffic, sidewalks, curb and gutter, striping, SWPPP, and safety. Duties also included monitoring and construction of electrical work, temporary and permanent lighting, relocation and installation of permanent fiber optic lines, temporary and permanent ramp metering and signalization. Project Cost: $1.5M.
EDUCATION
MS, Civil Engineering, California
State University, Long Beach
BS, Civil Engineering, California State
University, Long Beach
REGISTRATION|CERTIFICATION
CA, Civil Engineer, No. C60844
CA, QSP, No. 26605
SECTION 5: KEY PERSONNEL
Page | 18 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Firestone Boulevard Bridge Replacement Over San Gabriel River - Caltrans District 7, Norwalk|Downey, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of construction of a pre-cast concrete bridge widening on Firestone Boulevard over the San Gabriel River. Duties included, but were not limited to, full construction engineering and management and inspection of traffic control, striping, bridge demolition, bridge construction, drainage, electrical, safety, and SWPPP.
Duties also included office procedures, construction inspection and field verification, production daily diaries and photos, monitoring contractor progress and producing pay estimate quantities, performing safety inspections, SWPPP inspections, reviewing and preparing change orders, conducting employee interviews and responding to correspondence, reviewing RFI’s and submittals, reviewing CPM Schedule updates, responding to claims, and filing project documents. Project Cost: $24M.
Jamboree Bridge Widening/SR-73, City of Newport Beach/Caltrans D12 Project Manager and Resident Engineer: This Federally-Funded project consisted of construction of a pre-stressed concrete bridge widening on Jamboree Road Ave over SR-73 in Newport Beach, Tie-back Wall, Movable Barrier, new signalized intersections, utilities relocation and new construction, drainage and waterline construction, and relocation. The work included staff supervision, coordination with utility and maintaining the project budget. Work also included but not limited to advertising and awarding a construction contract, full contract administration, field inspection, and review and approve submittals, RFI’s and CCO’s. This project included Public Relations issues in terms of maintaining access to all residents, business owners, and pedestrians. Project Cost:
$3.5M.
Woollomes Ave Interchange Improvements, City of Delano
Project Manager and Resident Engineer: This Federally-Funded project consisted of construction of a pre-stressed concrete bridge widening on Woollomes Ave over SR-99 in Delano, a new detour and a cul-de-sac, new signalized intersections, utilities relocation and new construction, drainage and sewer construction, and relocation. The work included staff supervision, coordination with utility and railroad companies and maintaining the project budget. Work also included but not limited to advertising and awarding a construction contract, full contract administration, field inspection, and review and approve submittals, RFI’s and CCO’s. Project Cost: $5M.
Ramona Ave Grade Separation over UPRR - City of Montclair, Montclair, CA Project Manager|Resident Engineer: This Federally-Funded project of construction of a pre-stressed concrete bridge on Ramona Avenue over the Union Pacific Rail Road tracks, a new detour and a cul-de-sac, new signalized intersections, utilities relocation and new construction, drainage and sewer construction, and relocation. The work included staff supervision, coordination with utility and railroad companies and maintaining the project budget. Work also included advertising and awarding construction contract, full contract administration, field inspection, and reviewal and approval of submittals, RFI’s and CCO’s. This project included a great deal of Public Relations issues in terms of maintaining access for all residents, business owners, and pedestrians. Project Cost: $3.5M.
I-15|El Cerrito Interchange - City of Corona, Corona, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of widening to four lanes between the southbound off ramp and the northbound on ramp with Caltrans right of way. Responsible for the construction management and supervision of inspection for engineering services including contract administration, construction management and inspection services. Coordination with the City of Corona, Caltrans, designer, SCE, CHP, local Enforcement and Traffic Management Center for Caltrans, as well as the local water company. Work also included coordination of surveying and materials testing. Project Cost: $5M.
Del Amo Boulevard Bridge Overcrossing at I-405 - City of Carson, Carson, CA Project Manager|Resident Engineer: This Federally-Funded project consisted of approximately 760-meters of new roadway and bridge improvements, varying between 26.1 and 31.9 meters wide. The new roadway spans the I-405, Dominguez Channel and Macco Channel to accommodate six travel lanes, a concrete median island, left turn lanes, curb and gutter, sidewalks, retaining wall, northbound weigh-station on ramp modification, drainage improvements, ACC and PC paving, drainage, railroad and utility relocation.
Responsible for construction contract administration, preparing and checking designs, plans, specifications and estimates, inspecting and testing, collecting office and field data, and preparing reports with recommendations on a wide variety of civil engineering matters.
The work entailed review of all submittals, CCO’s, RFI’s and change of scope. Also responsible for field inspection and office procedures. Assisted structures personnel with coordinating work, resolving issues and writing CCO’s and correspondence. Project Cost: $38M.
SECTION 5: KEY PERSONNEL
Page | 19 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Dan Duarte
Construction Inspector
Mr. Duarte has over 30 years of experience working for Caltrans and private engineering firms which includes work as a constrruction inspector on roadways, highways, freeways, and bridges. He has also worked in the Design, Traffic, Survey, and Materials Departments for Caltrans, Distict 7. Mr. Duarte’s Construction inspection work, includes, but not limited to, new freeway construction (105 Century Freeway) emergency repair work (10 Freeway after the Northridge Earthquake) and (in 2019) restoration of mountain roads and drainage systems on PCH (Malibu) and on roadways in the Santa Monica Mountains after the Wolsey Fires and subsequent mudslides from heavy rains. Inspection experience includes: traffic control, excavation, grinding and paving, PCC, sidewalks, curb and gutter, ADA ramps, driveway, retaining walls, railing, median island, drainage, striping, waterlines, sewer lines, electrical, landscape and irrigation, SWPPP, landscape, and safety.
RELEVANT EXPERIENCE
I-15/Express Lanes and Widening Project, Design-Build, RCTC/Caltrans District 8, Riverside & San Bernardino, CA Roadway Construction Inspector (IQA): Responsible for supporting Caltrans design build project on I-15 in Corona that added HOV lane and associated improvements. The work included subgrade preparation, installation of drainage system, PCC pavement, HMA and RHMA paving, widening ramps, striping and traffic control. Duties included management and inspection of various items of work such as traffic control, electrical, landscape and irrigation, AC grinding, HMA and RHMA paving, excavation, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and as-builts. Project Cost: $350M.
SR-1 (PCH) and SR-23 Emergency Restoration Project, Caltrans District 7, Los Angeles, CA Assistant Resident Engineer: Responsible for supporting Caltrans emergency project EA 07-1XK704 on SR-1 (PCH) and SR-23. The project included debris removal and drainage system restoration. Dan worked with various Caltrans units including Environmental, Maintenance and the contractor to find the best solutions for each location impacted by fires and winter storm mudslides that closed roads and overwhelmed/damaged drainage systems. Duties included management and inspection of various items of work such as traffic control, PCC improvements, HMA and RHMA paving, AC grinding, PCC paving, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and as-builts.
Project Cost: $2.9M.
I-710 FWY Widening Project, South Gate, Bell Gardens, Bell, Vernon, Commerce, Monterey Park & Los Angeles, CA Assistant Resident Engineer: This project consisted of widening roadway, pavement rehabilitation and lowering the existing roadway grades to meet the new federal minimum vertical clearance standard on I-710 Freeway at all overcrossings within the project limits. Work included removing the existing damaged pavement with over 3,000 PPCP that required over 25 extended weekend closures with full freeway closed and implementing major traffic detours as work progressed. Nine miles of roadway were widened or rehabbed in both directions including ramps including work at three major interchanges at: I-5, SR 60 and I-10. Duties included management and inspection of various items of work such as traffic control, HMA and RHMA paving, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and as-builts. Project Cost: $120.0M.
I-710 FWY Widening and Rehab Project (Hot Mix Asphalt), South Gate, Bell Gardens, Bell, CA Assistant Resident Engineer: This project that included work on mainline and ramps pavement rehabilitation on I-710 Freeway and lowering the existing grades to meet the new federal minimum vertical clearance standard on I-710 Freeway at all overcrossings to improve safety and traffic flow within the project limits. Planning, implementing and monitoring counter-flow traffic control and lane closures were required over the extended weekend closures to perform the work described under the contract. Five miles of roadway widening and rehab work in both direction from LA River Bridge US to Slauson Avenue overcrossing. Duties included management and inspection of various items of work, traffic control, HMA and RHMA paving, AC grinding, PCC improvements on off-ramps and on-ramps such as curb ramps, electrical, landscape and irrigation, retaining walls, excavation, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and as-builts. Project Cost: $60M.
EDUCATION
BSCE from CSULB, Graduated with
Distinction, Long Beach, CA-1992
CERTIFICATION
Stormwater Protection Plan
Inspector (SWPPP)
SECTION 5: KEY PERSONNEL
Page | 20 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
ANTHONY MOUSSA
Construction / Electrical Inspector (As-Needed)
Mr. Moussa has more than 8 years of construction inspection. His construction experience includes inspection of traffic control, signage, striping, concrete/ADL removals, roadway excavation, trenching, storm drains, sewer lines, minor concrete, LCB, JPCP, HMA, and landscaping. Duties included construction inspection and Quality Control, producing daily reports and quantities calculations, producing progress photos, review and monitor schedule of work, ensure compliance with plans and specifications and certificates, review shop drawings, review and monitor change order work, assist with reviewing submittals and RFI’s, attending meetings, filing documents in project records, ensure safety, reviewing as-builts, and preparing punch list.
RELEVANT EXPERIENCE
I-605/Live Oak Avenue Ramp Widening & Improvements Project – City of Irwindale, CA Electrical / Construction Inspector: This Federally-Funded project consisted of a ramp widening and various improvements within Caltrans and City right-of-way. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, Edison service connections, drainage, landscape, and striping. Duties included management and inspection of various items of work, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and as-builts. Project Cost: $2M.
Foster Road Side Panel Improvements Project, City of Norwalk, CA Construction /Electrical Inspector: This Federally-Funded project consisted of construction of a safe walking and bike route to school as well as enhance safety along this corridor between Studebaker Road and Pioneer Boulevard in the city of Norwalk. Duties included but not limited to inspection of traffic control, striping, concrete traffic signals, loops, street lighting, median lighting, up-lights for trees, AC pavement, ADA ramps, sidewalks, driveways, landscape, hardscape, drainage, safety, and SWPPP. Project Cost:
$3.0M.
SR-210 and SR-110 Electrical Upgrades , (Caltrans District 7, Los Angeles, CA) Electrical / Construction Inspector: These Federally-Funded projects consisted of performing electrical upgrade as part of the rehabilitation work on both projects such as but not limited to ramp metering, temporary lighting, tunnel lighting, substation, sign lighting, light poles, pull boxes, conduit, and wiring. Duties included but not limited to monitoring and inspection of electrical work including temporary and permanent lighting, fiber optic lines, ramp metering and signalization, electrical conduits, pull boxes, conductors, concrete foundations, safety, and traffic control. In addition, project involved coordinating traffic signal turn and synchronization with Caltrans Traffic Operations and Maintenance. Project Cost: $55M.
Beverly Blvd. Traffic Safety and Lighting Improvements Project, City of Whittier, CA Electrical / Construction Inspector This Federally-Funded project consisted of improvements including raised median, HMA and RHMA paving, flatwork, landscape, irrigation, drainage, water and sewer lines, and more. Duties included but not limited to inspection of traffic control, signage, raised median, PCC pavement, Flatwork, pedestrian crossing, traffic signals, loops, street lighting, median lighting, video detection, bus shelters, relocate utilities, striping, Safety, and ensuring SWPPP compliance. Duties also included assisting the RE with office work and coordination in the field per Caltrans and Green Book Standards. Project Cost: $ 2.5M.
Alondra Blvd. Roadway Improvements Project, City of Norwalk, CA Electrical / Construction Inspector: This Federally-Funded project consisted of rehabilitation of Beverly Blvd. from Pioneer to Shoemaker; Work consisted of roadway excavation, HMA pavement, ADA ramps, sidewalk, curb and gutter, traffic signals, median lighting, loops, striping, and SWPPP. Duties included field inspection of construction work, coordinating with materials testing lab and field techs, producing daily dairies, producing monthly quantities, and coordination in the field per Caltrans and Green Book Standards.
Project Cost: $ 3.5M.
Firestone Boulevard Bridge Over the San Gabriel River Replacement Project, Cities of Norwalk, CA Electrical / Construction Inspector: This Federally-Funded project consisted of demolition of existing concrete girder box bridge and replacement with pre-cast girder box, drainage, paving, utilities, traffic signals, median lighting and electrical, loops, landscape, and hardscape. Duties included but not limited to monitoring and inspection of street rehabilitation to grind and overlay with rubberized asphalt, PCC paving, striping and loop replacement, landscape, and electrical work. Project Cost: $ 12M
EDUCATION
B.S. Electrical Engineering
REGISTRATION
Engineer in Training in progress
Page | 21 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
DAVID MOLINO
Electrical Inspector (As-Needed)
Mr. Molino has over 30 years of diversified construction experience which includes civil and electrical inspection on various civil and public works projects including, but not limited to, widening and improvements. Major work includes traffic control, utilities construction and relocation, grading and roadway excavation, ADA ramps, sidewalks, driveways, HMA and JPCP pavement, minor concrete, drainage, minor structures, street lighting, SMFO, Video detection, CCTV, traffic signals, fiber optics,SFMO, landscape, striping, and more. Duties include field inspection and quality assurance; preparing daily reports and quantities; reviewing and monitoring progress of work; ensuring compliance with plans and specifications; inspecting and ensuring safety compliance; preparing and reviewing as-built plans; and preparing punch lists. Mr.
Molino has extensive experience working with various standards including Caltrans, Greenbook, and County of Los Angeles.
RELEVANT EXPERIENCE
Stewart & Gray Fiber Optics & Communication Project / Imperial Highway Traffic Signal Project, City of Downey, CA Electrical Inspector: These Federally-Funded project consist of upgrading electrical and fiber optics along with roadway improvements on two separate projects. Work included, but was not limited to, traffic control, traffic signals, electrical, fiber optics, loops, concrete and asphalt pavement, ADA ramps, sidewalk, and striping. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Projects Cost: $2.8M (Combined).
Woodruff Avenue Traffic Signal Fiber Optics Communication System and Upgrades Project, City of Downey, CA Electrical Inspector: This project consisted of upgrading fiber optics along with roadway improvements on Woodruff Avenue between Firestone Boulevard and Foster Road to provide traffic signal improvements along the corridor and improve safety and traffic flow. Work included, but was not limited to, traffic control, traffic signals, electrical, fiber optics, loops, concrete and asphalt pavement, ADA ramps, sidewalk, and striping. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Project Cost: $800K.
Serrano Avenue Electrical Improvements Project, City of Anaheim, CA Construction Superintendent/QC Manager: This project consisted of installation of 11,000 LF of SMFO, upgrading traffic signals, and upgrading street lights. Work included, but was not limited to, traffic control, traffic signals, electrical, fiber optics, loops, and street lights. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Project Cost: $1.8M.
Glenoaks Electrical Improvements Project, City of Glendale, CA Construction Superintendent/QC Manager: This project consisted of installation of 12 new traffic signals, removal of old signals and the restoration of roadway and sidewalk in the City of Glendale. Work included, but was not limited to, traffic control, traffic signals, electrical, and ADA ramps. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Project Cost: $1.8M.
Mid-City Light Rail Expo Project, City of Norwalk, Metro / City of Los Angeles, CA Construction Superintendent/QC Manager: This Federally-Funded project consisted of Temp traffic signals and street lighting for general contractor to start removal, as project progress install new conduits, foundation and equipment for traffic signal and street lighting, as another part of this project was to install all electrical conduits, wiring, fixture and equipment in electric/comm. rooms to support 5 platforms for 3 station. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Project Cost: $20M.
Foothill Fiber Optic / CCTV Project, Caltrans D8 / County of San Bernardino, CA Construction Foreman/QC Manager: This Federally-Funded project consisted of Upgrade pull boxes, remove twisted pair interconnect ,pull in new fiber ,install 3 new 40' CCTV pole ,cameras, nodes, and restore all sidewalk from Baseline Road to Indian Hill Road. Duties included managing the construction crew, ordering materials ensuring quality control, ensuring compliance to project plans and specifications, and producing pay estimates. Project Cost: $650K.
EDUCATION
High School Diploma
REGISTRATION/CERTIFICATION
10 Hour OSHA
CA Certified Electrician
Traffic Signal Tech Level I
Work Zone Traffic Control
LA Qualified Safety Person
KEY PERSONNEL
Page | 22 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
RICHARD SHIRLEY, RLA
Landscape Inspector (As-Needed)
Mr. Shirley is a registered landscape architect with more than 24 years of design and construction experience. He has utilized his skills on a variety of projects, including streets, freeways, single and multi-unit housing facilities, commercial properties, manufacturing facilities and private estates. Responsibilities include inspection and project admin. He has experience in plant ecology, botany, reclaimed water, and horticulture. He has been awarded the Montecito Beautification Award and has been recognized in a number of trade publications. He was also a design coordinator for the Encino Design House in 1992 and 1993. He has extensive city and public works experience including landscape conceptual designs. He has assisted in refining specifications, budgets, estimating and calculations for large construction projects. Mr.
Shirley has reviewed and studied policies and procedures including the State Documentation and Construction Manuals and the Standard Plans and Specifications for Roadway Construction.
RELEVANT EXPERIENCE
Los Penasquitos Lagoon Bridge Replacement Project, San Diego, CA Construction Inspector: Project consisted of restoration of the native habitat/communities considering salinity, PH, invasive weeds, and on-site plant propagation and on-site work took place within the railroad right-of-way and the inherent restrictions and regulations of the NCTD. Duties included but not limited to construction inspection of daily work, produce daily diaries, prepare pay estimate quantities, take daily photos, PR and Outreach, and file project documents. Project Cost $2M.
Agoura Road Widening Project, Agoura Hills. CA
Construction Inspector: Project consisted of 2.5 miles of 2 lane roadway into a vital 4 lane corridor within a native environment and serving as a bypass to the nearby Highway 101. Work included but not limited to ARHM pavement, sidewalk, driveways, ADA ramps, curb and gutter, traffic signal, irrigation, landscape, striping, safety, and SWPPP. Duties included but not limited to construction inspection of daily work, produce daily diaries, prepare pay estimate quantities, take daily photos, PR and Outreach, and file project documents. Project Cost $5.5M.
Duncan Canyon Overcrossing, Fontana, CA
Construction Inspector: Project consisted of demolition and reconstruction of the interchange ramps and the bridge. Work included but not limited to bridge demo and reconstruction, retaining structures, ARHM pavement, sidewalk, driveways, ADA ramps, curb and gutter, traffic signal, irrigation, landscape, striping, safety, and SWPPP. Duties included but not limited to construction inspection of daily work, produce daily diaries, prepare pay estimate quantities, take daily photos, PR and Outreach, and file project documents. Project Cost. $2.5M.
Hunts Lane Grade Separation, San Bernardino, CA
Construction Inspector: Project consisted of construction of a new of an at-grade railroad separation bridge. Work included but not limited to railroad re-alignments, bridge construction, retaining structures, ARHM pavement, sidewalk, driveways, ADA ramps, curb and gutter, traffic signal, irrigation, landscape, striping, safety, and SWPPP. Duties included but not limited to construction inspection of daily work, produce daily diaries, prepare pay estimate quantities, take daily photos, PR and Outreach, and file project documents. Project Cost. $3.5M.
I-5/Ortega Highway Interchange Improvement Project, Caltrans District 12/OCTA/City of San Juan Capistrano, , CA Construction Inspector: Project consisted of constructing a new traffic interchange that replaced the existing I-5 / Ortega Highway interchange. Work included but not limited to bridge demo and reconstruction, retaining structures, ARHM pavement, sidewalk, driveways, ADA ramps, curb and gutter, traffic signal, irrigation, landscape, striping, safety, and SWPPP. Duties included but not limited to construction inspection of daily work, produce daily diaries, prepare pay estimate quantities, take daily photos, PR and Outreach, and file project documents. Project Cost: $14.3M.
EDUCATION
BS, Landscape Architecture, Cal Poly
Pomona
REGISTRATION
CA, Landscape Architect, No. 2252
10 Hour OSHA Training for the
Construction
SWPPP Course, Certification Pending
KEY PERSONNEL
Page | 23 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05
SAMAR ALFAKHOURI
Office Engineer (As-Needed)
Ms. Alfakhouri has more than 10 years of experience in office engineering and construction administration on public works projects for public works agencies and construction contractors. Her responsibilities include, but are not limited to, maintaining accurate and complete project records and files; maintaining contract records; assisting the Project Manager with change orders, submittals, and RFIs; assisting in preparing quantity calculations and cost estimates; coordinating with various agencies; preparing and maintaining project files; reviewing and preparing correspondence; preparing and updating spreadsheets; converting working files to PDF; and preparing various reports. Ms. Alfakhouri has extensive experience working on federally funded projects that utilize FHWA and Local Assistance Procedures Manual requirements for documentation and filing, verifying certified payroll of contractors, and producing documentation and reports accordingly.
RELEVANT EXPERIENCE
I-605/Live Oak Ramp Widening & Rehabilitation Project, Caltrans District 7 & City of Irwindale, CA Office Engineer: This Federally-Funded project consisted of various improvements including widening of the EB and WB off ramps, curbs and gutters, ADA ramps, sidewalks, lighting, traffic signals, SCE service connections and drops, HMA pavement, traffic control, and striping. Duties included, but were not limited to, preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining submittals logs, RFI logs, Contractor Change Order (CCO) logs, and testing logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Project Cost: $1.8M.
Foster Road Rehabilitation Project, City of Bellflower & City of Norwalk, CA Office Engineer: This Federally-Funded project consisted of various improvements including reconstruction of side panels, curbs and gutters, ADA ramps, sidewalks, lighting, traffic signals, SCE service connections and drops, HMA pavement, traffic control, and striping. Duties included, but were not limited to, preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining submittals logs, RFI logs, CCO logs, and testing logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Project Cost: $2M.
AC Overlay on Various Streets - City of Moorpark and Caltrans District 7, Moorpark, CA Office Engineer: This Federally-Funded project consisted of major roads grind and overlay asphalt paving, curb ramps, materials testing, surveying and electrical. Duties included, but were not limited to, preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining submittals logs, RFI logs, CCO logs, and testing logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Project Cost: $500K.
Beverly Boulevard Traffic Safety & Lighting Improvements Project, City of Downey, Whittier, CA Office Engineer: This Federally-Funded project consisted of improvements to Beverly Boulevard from SR-605 to Norwalk Boulevard. Duties included, but were not limited to, preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs, RFI logs, CCO logs, and materials testing report logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Project Cost: $2.2M.
Firestone Boulevard Bridge Replacement, City of Norwalk, Norwalk, CA Office Administrator: This Federally-Funded project consisted of the demolition and reconstruction of a precast concrete girder bridge over the San Gabriel River. As Office Engineer, Ms. Alfakhouri’s duties included, but were not limited to, preparing and maintaining project files, performing document control, creating and updating correspondence logs, preparing and updating submittal logs, logging and maintaining submittals logs, maintaining RFI logs, maintaining CCO logs, maintaining testing logs, preparing progress reports, assisting the Resident Engineer with reviewing CCO and pay estimate requests, collecting inspector reports and quantities, and verifying the contractor’s certified payroll. Project Cost: $11M.
SECTION 6: RELEVANT EXPERIENCE
Page | 24 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 6: RELEVANT EXPERIENCE
Relevant Project and References
Stewart & Gray Fiber Optic Traffic Signal Communication Project | City of Downey, CA Client City of Downey Contact Edwin Norris, PE – Project Manager 11111 Brokshire Avenue
Downey, CA 90241
(562) 904-7110
[email protected]
Project Description
This Federally Funded Project consists of construction of a fiber optic traffic signal communication sytem on Stewart & Gray Road, installation of video detection system at three signalized intersections, installation of communication hub cabinets, replacement of electrical services with service cabinets, reconstruction of curb ramps and cross gutters, and traffic signal modifications and upgrades at various intersections including Old River School Rd., Downey Ave. Patton Rd., Lakewood Blvd., Bellflower Blvd., and Firestone Blvd.
Scope of Services
FCG is performing construction management and inspection services per Caltrans LAPM and Caltrans Construction Manaual.
Work included traffic control, potholing, installation of electrical and communication related items, flatwork, SWPPP, and striping.
Duties included management and inspection of various items of work, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and preparing as-builts.
Dates 11/2018 – 04/2020 Cost $2 Million
Staff A.B. Fakhouri, Project Manager; David Molino, Inspector; Samar Alfakhouri, Office Engineer.
Imperial Highway Traffic Signal Upgrades Project | City of Downey, CA Client City of Downey Contact Edwin Norris, PE – Project Manager 11111 Brokshire Avenue
Downey, CA 90241
(562) 904-7110
[email protected]
Project Description
This Federally Funded Project consisted of traffic signal modifications and upgrades at 11 intersections, replacement of existing traffic signal equipments, replacements of poles and mast ars, vehicle and pedestrian indications, pushbuttons, conduits, pull boxes, conductors, controller cabinets, battery back-up sustems, LED safety lighting, curb ramps and pavement markings, and signage.
Scope of Services
FCG performed construction management and inspection services per Caltrans LAPM and Caltrans Construction Manaual. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, Edison service connections, drainage, landscape, and striping.
Duties included management and inspection of various items of work, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and preparing as-builts.
Dates 11/2018 – 04/2020 Cost $2 Million
Staff A.B. Fakhouri, Project Manager; David Molino, Inspector; Samar Alfakhouri, Office Engineer.
SECTION 6: RELEVANT EXPERIENCE
Page | 25 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Burbank Channel Bikeway Project BS-1481 | City of Burbank, CA Client City of Burbank Contact Omar moheize – Principal Civil Engineer 150 North Third Street
Burbank CA 91502
(818) 238-3915
[email protected]
Project Description
This Federally Funded Project consists of 0.79-mile bike and pedestrian path that is being constructed adjacent to the Burbank Western Channel. Work includes activities required to ensure that construction is performed in accordance with permit requirements, Federal and State regulations, and the approved plans and specifications.
Scope of Services
FCG performed construction management and inspection services per Caltrans LAPM and Caltrans Construction Manaual. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, Edison service connections, drainage, landscape, and striping. Duties included management and inspection of various items of work, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and preparing as-builts.
Dates 12/2019 – Ongoing Cost $2 Million
Staff A.B. Fakhouri, Project Manager; Sami Hamamdeh, Inspector; Anthony Moussa, Inspector.
I-605/Live Oak Avenue Ramp Widening | Irwindale, CA
Client City of Irwindale Contact Arsanious Hanna, PE – City Engineer/Building Official 16102 Arrow Highway
Irwindale, CA 91706
(562) 477-5747
[email protected]
Project Description
This Federally Funded Project consisted of reconstruction of the 1-605 northbound off-ramp at Live Oak Avenue and installation of a traffic signal at the intersection. In addition, the direct ramp to eastbound Live Oak Avenue was widened to provide dual right lanes at Live Oak Avenue. The project included cold milling the existing asphalt pavement, removal and replacement of road bases in the deteriorated areas, resurfacing with conventional asphalt, and re-striping and adjusting utility manholes within the project limits.
Scope of Services
FCG performed construction management and inspection services per Caltrans LAPM and Caltrans Construction Manaual.
Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, Edison service connections, drainage, landscape, and striping. Duties included management and inspection of various items of work, office engineering, conducting meetings, reviewing submittals and RFIs, CCOs, daily diaries and quantities, daily photos, coordinating materials testing and lane closures, filing documents, and preparing as-builts.
Dates 11/2018 – 04/2020 Cost $2 Million
Staff A.B. Fakhouri, Project Manager; Jaime Engler, Resident Engineer; Anthony Moussa, Inspector; Tony Alfakhouri, Inspector; Leon Fuentes, Electrical Inspector; Samar Alfakhouri, Office Engineer; Sam Elachkar, Scheduler
SECTION 6: RELEVANT EXPERIENCE
Page | 26 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Foster Road Side Panel Project | Norwalk, CA
Client City of Norwalk Contact Randy Hillman, PE – Associate Engineer 12700 Norwalk Boulevard
Norwalk, CA 90650
(562) 929-5727
[email protected]
Project Description
This Federally Funded Project consisted of the demolition and replacement of side panels, HMA, slurry seal, sidewalk, curb and gutter, electrical, fiber optic, traffic control, water/irrigation line, striping, SWPPP, and safety.
Scope of Services
FCG performed construction management and inspection
services per Caltrans LAPM. Construction management and inspection of various work items; office engineering; conducting meetings; performing reviews of submittals, RFIS, and CCOs; preparing daility diaries and quantities; taking project photos;.
FCG performed inspection of traffic control, signage, striping, PCC and AC paving, electrical, traffic signals, minor concrete, safety, SWPPP, and striping.
Dates 01/2018 – 12/2018 Cost $3 Million
Staff A.B. Fakhouri, Project Manager/Resident Engineer; Leon Fuentes, Inspector; Walid Naouchi, Inspector; Samar Alfakhouri, Office Engineer; Sam Elachkar, Scheduler
AC Overlay Project | Moorpark, CA
Client City of Moorpark Contact Daniel Kim – Senior City Engineer 799 Moorpark Avenue
Moorkpark, CA 93021
(808) 517-6255
[email protected]
Project Description
This Federally Funded Project consisted of asphalt overlay of Spring Road, Princeton Avenue, Poindexter Avenue, and
Gabbert Road; grind and overlay asphalt paving; curb ramps; materials testing; surveying; and electrical.
Scope of Services
FCG performed construction management and inspection
services per Caltrans LAPM. FCG performed construction
management and inspection services. Work included preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining submittals logs, RFI logs, CCO logs, and testing logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests, collecting inspector reports and quantities, and verifying the Contractor’s certified payroll.
Dates 11/2017 - 02/2018 Cost $500K
Staff A.B. Fakhouri, Project Manager/Resident Engineer; Leon Fuentes, Inspector; Tony Alfakhouri, Inspector; Abel Moreno (RTEA), Office Engineer; Sam Elachkar, Scheduler
SECTION 6: RELEVANT EXPERIENCE
Page | 27 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Beverly Boulevard Traffic Safety & Lighting Improvements Project | Whittier, CA Client City of Whittier Contact Carl Hassel, PE – Administration Capital Projects Manager
13230 Penn Street
Whittier, CA 90602
(562) 567-9302
[email protected]
Project Description
This Federally Funded Project consisted of construction of a median strip, street lighting, bike lanes, and a bus shelter on Beverly Boulevard between Norwalk and Pioneer boulevards.
Scope of Services
FCG performed construction management and inspection
services per Caltrans LAPM. Construction management and inspection services were performed for the removal and
placement of PCC pavement, slurry seal, raised median,
pedestrian crossing, street lighting, electrical, ADA ramps, striping, and landscape. Work included preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs, RFI logs, CCO logs, and materials testing report logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests, collecting inspector reports and quantities, and verifying the Contractor’s certified payroll Dates 11/2016 - 05/2017 Cost $2.2 Million
Staff A.B. Fakhouri, Project Manager/Resident Engineer; Timmy To, Electrical Inspector; Anthony Moussa, Inspector; Samar Alfakhouri, Office Engineer; Sam Elachkar, Scheduler.
Firestone Boulevard Over San Gabriel River Bridge Replacement Project | Norwalk, CA Client City of Norwalk Contact Mazen Dabboussi, PE – Transportation Engineer 12700 Norwalk Boulevard
Norwalk, CA 90650
(323) 497-1315
[email protected]
Project Description
This Federally Funded Project consisted of replacement of the existing Firestone Boulevard Bridge in its entirety with a new bridge which meets current standards, with wider sidewalks, a center median, and shoulders.
Scope of Services
FCG performed construction management and inspection
services per Caltrans LAPM. Construction management and inspection services were performed for demolition and
replacement of the bridge, HMA, slurry seal, sidewalk, curb and gutter, electrical, fiber optic, traffic control, water/sewer line, striping, SWPPP, and safety. Inspection duties included inspection of traffic control, signage, striping, PCC and AC paving, electrical, traffic signals, minor concrete, safety, SWPPP, and striping. Office duties included, but were not limited to, preparing and maintaining project files, performing document control, creating and updating correspondence logs, preparing and updating submittal logs, logging and maintaining submittals logs, maintaining RFI logs, maintaining CCO logs, maintaining testing logs, preparing progress reports, assisting the Resident Engineer with reviewing CCO and pay estimate requests, collecting inspector reports and quantities, and verifying certified payroll.
Dates 05/2014 - 02/2016 Cost $12 Million
Staff A.B. Fakhouri, Project Manager/Resident Engineer; Jaime Engler, Construction Inspector/Office Engineer; Cary Brobeck; Inspector Leon Fuentes, Electrical Inspector, Samar Alfakhouri, Office Engineer; Sam Elachkar, Scheduler
SECTION 6: RELEVANT EXPERIENCE
Page | 28 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 I-99/Woollomes Avenue Interchange and Ramp Reconstruction Project, Caltrans District 6, Central California – Bakersfield, CA Client Kern County Contact Pedro Nunez – Project Manager, City of Delano 1015 Eleventh Avenue
Delano, CA 93216
(661) 800-1648
[email protected]
Project Description
This project consisted of demolition and reconstruction of portion of the existing box girder bridge and replacement with a box girder bridge over the I-99 in the city of Delano along with local street improvements. Project included stage construction to widen Northbound and Southbound On Ramps and Off ramps
along with many other improvements such as grading, paving, drainage, grading, retaining walls, and more.
Scope of Services
FCG performed construction management and inspection
services per Caltrans Constr. Manual. Duties included, but were not limited, to managing the construction project, managing inspection and office engineering, coordinating utilities, coordinating closures, coordinating with Caltrans for field inspection, reviewing and approving all submittals, RFIs, schedules, claims, contract change orders, mix designs, shop drawings, field inspection, coordinating with materials testing, and quantities.
Dates 06/2012 – 3/2013 Cost $5 Million
Staff A.B. Fakhouri, Resident Engineer.
NB Jamboree Boulevard Widening Over SR-73, City of Newport/Caltrans District 12, Newport Beach, CA Client City of Newport Beach Contact Mike Sinacori, PE – Deputy City Engineer 100 Civic Center Dr.
Newport Beach, CA 92660
(949) 795-8948
[email protected]
Project Description
This $5 million project consisted of grading, roadway excavation and backfill, JPCP pavement, HMA pavement, LCB, PCC,
MBGR, drainage, electrical, traffic control, and structural concrete. Other work included striping of white, yellow, thermoplastic, reflective markers, seal joints, and loops. Most of the construction was completed at night to minimize
inconvenience to motorists, though there was some work during the day.
Scope of Services
FCG performed construction management and inspection
services per Caltrans LAPM and Caltrans Construction
Manual. Duties included, but were not limited, to managing the construction project, managing inspection and office engineering, coordinating utilities, coordinating closures, coordinating with Caltrans for field inspection, reviewing and approving all submittals, RFIs, schedules, claims, contract change orders, mix designs, shop drawings, field inspection, coordinating with materials testing, and quantities
Dates 03/2011 – 06/2012 Cost $3.0 Million
Staff A.B. Fakhouri, Project Manager/Resident Engineer; Darren Hopper, Construction Inspector; Jaime Engler, Office Engineer
SECTION 7: FEE PROPOSAL
Page | 29 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 7: FEE PROPOSAL
Our Fee Proposal is provided in a separate sealed envelope.
SECTION 8: SCHEDULE Page | 30 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 8: SCHEDULE
SECTION 8: SCHEDULE
Page | 31 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Resource Management & Staffing
FCG has carefully reviewed the project documents made available with the RFP package and has developed a staffing plan based on the project schedule, scope of work, and anticipated project needs. Please reference the table of on the following page for our approach to staffing. The team members proposed for this project have been selected based on both their qualifications and availability to perform the work. Our key staff have managed numerous projects like this one and can apply this knowledge and experience to hit the ground running. These individuals have the availability, the qualifications, and in many cases the cross-training for both office and field positions to cost-effectively solve problems at any level. Our team has extensive experience working on public works projects that utilize Greenbook, Caltrans standards and procedures, and Caltrans LAPM.
We provide large business service with a team of multi-disciplined professionals; however, what differentiates our firm from others is having the ability to provide a small business, client-focused, and customer-service approach to deliver each client the one-on- one attention needed to specifically tailor cost-effective solutions and solve unique project needs. FCG staff ensures this by making sure our team is selected based on availability and relevant experience, full understanding of the scope of services, and knowledge of the needs of the stakeholders. We realize our people are our greatest strength and therefore our greatest asset. Our success is based on hiring the best people to produce the highest quality results at the most reasonable price and continues through our internal comprehensive training program that can get inspectors up to speed on any work assignment and in any work environment, concluding with our quality maintenance processes. This training program enables us to propose cross-trained staff that can cover multiple disciplines of the work, i.e., structures and roadway, electrical and landscape, etc. Cross-trained staff are key to efficiently budgeting for our services and providing clients with competitive fees.
Resource Management
The table below highlights FCG’s approach to managing resources to ensure the successful delivery of the project within the proposed budget and schedule. Our proposed Construction Inspector is 100% dedicated to this project.
SECTION 8: SCHEDULE
Page | 32 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 Resource Matrix
A resource matrix is provided below which lists detailed tasks in rows, the individual assigned to each task, and the number of hours associated with each task.
SECTION 9: CERTIFICATIONS
Page | 33 Proposal to Provide Construction Management, Inspection and Materials Testing Services Telegraph Road Traffic Throughput and Safety Enhancements Project, Phase 2; CIP No. 16‐05 SECTION 9: CERTIFICATIONS
The forms listed below are provided on the following pages:
Consultant Proposal DBE Commitment (LAPM Exhibit 10-O1) Notice to Proposers DBE Information (LAPM Exhibit 10-I) Non-Collusion Affidavit
Non-Lobbying Certification
Non-Discrimination Certification
Debarment and Suspension Certification
Local Assistance Procedures Manual Exhibit 10-O1
Consultant Proposal DBE Commitment
LPP 18-01 Page 1 of 2
January 2019
EXHIBIT 10-O1 CONSULTANT PROPOSAL DBE COMMITMENT
1.Local Agency: City of Downey 2.Contract DBE Goal: 75%
3.Project Description:
This project involves the construction of raised median islands with landscaping and irrigation, pavement rehabilitation, construction of new sidewalk and repair of miscellaneous concrete surfaces in accordance with the Americans with Disabilities Act, traffic signal upgrades and incidental signing and striping.
4.Project Location: Telegraph Road between Lakewood Blvd.-Rosemead Blvd. and the WCL and between Passons Blvd. and the ECL
5.Consultant's Name:6.Prime Certified DBE:
7.Description of Work, Service, or Materials
Supplied
8.DBE
Certification
Number
9.DBE Contact Information 10. DBE %
Local Agency to Complete this Section
11.TOTAL CLAIMED DBE PARTICIPATION %
17.Local Agency Contract Number:CIP 16-05
18. Federal-Aid Project Number:STPL-5334(063)
19.Proposed Contract Execution Date:1-12-21
20. Consultant’s Ranking after Evaluation:___________________ Local Agency certifies that all DBE certifications are valid and information on this form is complete and accurate.
IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Written confirmation of each listed DBE is required.
21.Local Agency Representative's Signature 22.Date 12.Preparer's Signature 13.Date Edwin J. Norris
(562)904-7110
23.Local Agency Representative's Name 24.Phone 14.Preparer's Name 15.Phone Deputy Director of Public Works
25.Local Agency Representative's Title 16.Preparer's Title DISTRIBUTION: Original – Included with consultant’s proposal to local agency.
ADA Notice: For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654- 3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
Maha Fakhouri, President & CEO - FCG Consultants, Inc.
22885 Savi Ranch Parkway, Suite G, Yorba Linda, CA
(714) 312-0317 / [email protected] 85.60%Construction Management & Inspection 46140
85.60%
Maha Fakhouri (714) 312-0317
11/09/2020
President / CEO
Local Assistance Procedures Manual EXHBIT 10-I
Notice to Proposers DBE Information
January 2020
EXHIBIT 10-I NOTICE TO PROPOSERS DBE INFORMATION
(Federally funded projects only)
The Agency has established a DBE goal for this Contract of ____75____%
1. TERMS AS USED IN THIS DOCUMENT
• The term “Disadvantaged Business Enterprise” or “DBE” means a for-profit small business concern owned and controlled by a socially and economically disadvantaged person(s) as defined in Title 49, Code of Federal Regulations (CFR), Part 26.5.
• The term “Agreement” also means “Contract.”
• Agency also means the local entity entering into this contract with the Contractor or Consultant. • The term “Small Business” or “SB” is as defined in 49 CFR 26.65.
2. AUTHORITY AND RESPONSIBILITY
A. DBEs and other small businesses are strongly encouraged to participate in the performance of Contracts financed in whole or in part with federal funds (See 49 CFR 26, “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs”).
The Consultant must ensure that DBEs and other small businesses have the opportunity to participate in the performance of the work that is the subject of this solicitation and should take all necessary and reasonable steps for this assurance. The proposer must not discriminate on the basis of race, color, national origin, or sex in the award and performance of subcontracts.
B. Proposers are encouraged to use services offered by financial institutions owned and controlled by DBEs.
3. SUBMISSION OF DBE INFORMATION
If there is a DBE goal on the contract, Exhibit 10-O1: Consultant Proposal DBE Commitment must be included in the Proposal. In order for a proposer to be considered responsible and responsive, the proposer must make good faith efforts to meet the goal established for the contract. If the goal is not met, the proposer must document adequate good faith efforts. All DBE participation will be counted towards meeting the contract goal; therefore, all DBE participation shall be collected and reported.
Exhibit 10-O2 Consultant Contract DBE Information must be included in best qualified consultant’s executed consultant contract. Even if no DBE participation will be reported, the successful proposer must execute and return the form.
4. DBE PARTICIPATION GENERAL INFORMATION
It is the proposer’s responsibility to be fully informed regarding the requirements of 49 CFR, Part 26, and the Department’s DBE program developed pursuant to the regulations. Particular attention is directed to the following:
A. A DBE must be a small business firm defined pursuant to 13 CFR 121 and be certified through the California Unified Certification Program (CUCP).
B. A certified DBE may participate as a prime consultant, subconsultant, joint venture partner, as a vendor of material or supplies, or as a trucking company.
C. A DBE proposer not proposing as a joint venture with a non-DBE, will be required to document one or a combination of the following:
1. The proposer is a DBE and will meet the goal by performing work with its own forces.
2. The proposer will meet the goal through work performed by DBE subconsultants, suppliers or trucking companies.
3. The proposer, prior to proposing, made adequate good faith efforts to meet the goal.
Local Assistance Procedures Manual EXHBIT 10-I
Notice to Proposers DBE Information
January 2020
D. A DBE joint venture partner must be responsible for specific contract items of work or clearly defined portions thereof. Responsibility means actually performing, managing, and supervising the work with its own forces. The DBE joint venture partner must share in the capital contribution, control, management, risks and profits of the joint venture commensurate with its ownership interest.
E. A DBE must perform a commercially useful function pursuant to 49 CFR 26.55, that is, a DBE firm must be responsible for the execution of a distinct element of the work and must carry out its responsibility by actually performing, managing and supervising the work.
F. The proposer shall list only one subconsultant for each portion of work as defined in their proposal and all DBE subconsultants should be listed in the bid/cost proposal list of subconsultants.
G. A prime consultant who is a certified DBE is eligible to claim all of the work in the Contract toward the DBE participation except that portion of the work to be performed by non-DBE subconsultants.
5. RESOURCES
A. The CUCP database includes the certified DBEs from all certifying agencies participating in the CUCP. If you believe a firm is certified that cannot be located on the database, please contact the Caltrans Office of Certification toll free number 1-866-810-6346 for assistance.
B. Access the CUCP database from the Department of Transportation, Office of Civil Rights website.
1. Click on the link titled “Access the DBE Query Form”
2. Click on “Start DBE Firms Query” link
Searches can be performed by one or more criteria. Follow instructions on the screen.
6. materials or supplies purchased from dbes count towards the dbe goal under the following conditions:
A. If the materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies. A DBE manufacturer is a firm that operates or maintains a factory, or establishment that produces on the premises the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.
B. If the materials or supplies purchased from a DBE regular dealer, count 60 percent of the cost of the materials or supplies. A DBE regular dealer is a firm that owns, operates or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a DBE regular dealer, the firm must be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A person may be a DBE regular dealer in such bulk items as petroleum products, steel, cement, gravel, stone or asphalt without owning, operating or maintaining a place of business provided in this section.
C. If the person both owns and operates distribution equipment for the products, any supplementing of regular dealers’ own distribution equipment shall be, by a long-term lease agreement and not an ad hoc or Agreement-by-Agreement basis. Packagers, brokers, manufacturers’ representatives, or other persons who arrange or expedite transactions are not DBE regular dealers within the meaning of this section.
D. Materials or supplies purchased from a DBE, which is neither a manufacturer nor a regular dealer, will be limited to the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, or fees or transportation charges for the delivery of materials or supplies required on the job site, provided the fees are reasonable and not excessive as compared with fees charged for similar services.
NON-LOBBYING CERTIFICATION
CITY OF DOWNEY REQUEST FOR PROPOSAL
FOR CONSTRUCTION MANAGEMENT, INSPECTION
AND MATERIALS TESTING SERVICES FOR THE
TELEGRAPH ROAD TRAFFIC THROUGHPUT AND
SAFETY ENHANCEMENTS PROJECT, PHASE 2
RFP NO.: 21-005
Capital Improvement Project No. 16-05
Federal Project No. STPL-5334(063)
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
1.No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
2.If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a “Disclosure of Lobbying Activities”.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly.
Firm
Signed and Printed Name:
Title
Date
FCG Consultants, Inc.
Maha Fakhouri,
President / CEO
November 9, 2020
NON-DISCRIMINATION CERTIFICATION
CITY OF DOWNEY REQUEST FOR PROPOSAL
FOR CONSTRUCTION MANAGEMENT, INSPECTION
AND MATERIALS TESTING SERVICES FOR THE
TELEGRAPH ROAD TRAFFIC THROUGHPUT AND
SAFETY ENHANCEMENTS PROJECT, PHASE 2
RFP NO.: 21-005
Capital Improvement Project No. 16-05
Federal Project No. STPL-5334(063)
The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Contractor’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
6. In the event of the Contractor’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.
7.The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States.
8.Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
President / CEO
FCG Consultants, Inc.
11/09/2020
DEBARMENT AND SUSPENSION CERTIFICATION
CITY OF DOWNEY REQUEST FOR PROPOSAL
FOR CONSTRUCTION MANAGEMENT, INSPECTION
AND MATERIALS TESTING SERVICES FOR THE
TELEGRAPH ROAD TRAFFIC THROUGHPUT AND
SAFETY ENHANCEMENTS PROJECT, PHASE 2
RFP NO.: 21-005
Capital Improvement Project No. 16-05
Federal Project No. STPL-5334(063)
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
•Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
•Has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
•Does not have a proposed debarment pending; and
•Has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
Signature:
Title:
Firm:
Date:
______________________________________________
President & CEO________________________________
FCG Consultants, Inc.____________________________
November 9, 2020_______________________________
www.southstareng.com
22885 Savi Ranch Parkway, Suite G
Yorba Linda, California 92887
Tele | 714.312.0317
Fax | 714.312.0793
www.fcgconsultants.com
Grade Separations
Railroad
Transit
Highways
Freeways
Bridges
Water Lines
Sewer Lines
Wastewater
Street Lighting
Signalized Intersections
Fiber Optics
Landscape
Hardscape
Striping
SWPPP
Capital Improvements
Public Works
Transportation
Design‐Build
CMGC
Ports
Airports
School Districts
Trusted
Partner
for
Construction
Management
and Inspection
Services
CITY OF DOWNEY
Statement of Qualifications for:
On-Call Public Works Construction
Management, Inspection and Materials
Testing Services - No. 24-02 FY2024-2027
March 15, 2024
Attachment B
Cover Letter
(909) 595-1940 F: (909) 595-1314
gkandassociates.com
March 15, 2024
City of Downey / Department of Public Works
Attn.: Matthew Baumgardner, P.E.
Director of Public Works/City Engineer
11111 Brookshire Avenue
Downey, CA 90241-7016
Subject: SOQ to Provide On-Call Public Works Construction Management, Inspection and Materials Testing Services - No. 24-02 FY 2024-2027 Dear Mr. Baumgardner,
GK & Associates has been your consultant for as-needed Construction Management, Inspection and Materials Testing services for the past thirteen years. Through this involvement we have not only gained invaluable knowledge of your needs and expectations, we have direct working experience with the processes and systems that are successfully being used on your existing construction projects. As you look for the firm to assist you with the similar set of services during the next three years, we are confident you will be best served by the firm you already have: GK & Associates.
■Experienced experts with technical expertise - Our experienced team, led by Daryl Lopez and supported by our staff, will remain dedicated to your ongoing and upcoming projects. With Daryl’s extensive experience, along with our team’s expertise, we ensure seamless continuity and the ability to anticipate and address project design issues proactively, as previously demonstrated. ■Continuity - Our established relationship and trust are invaluable investments. This means savings for Downey by avoiding the need to orientate and train a new firm to your organization, culture, and systems. Our commitment to continuity is evident in the 40% of our personnel already engaged in your ongoing projects, including CIP 24-01 Miscellaneous Concrete Repair, ADA/Fire station No. 1 concrete repairs project, Paramount Blvd & Median Landscape Improvements, and 3rd Street Pavement Rehabilitation Project to name a few. ■Cost savings - Our staff have identified issues on almost every project in the design phase that would have cost Downey money and time had they gone out to bid without our review.
The nature of this assignment calls for flexibility, bench strength, and quick response in addressing your staffing needs as you need to fill them. We have proposed highly qualified, locally based, construction managers, supported by experienced construction inspectors. As President of GK & Associates, I will continue to be the main point of contact for all project staff related inquiries through the life of the Services Agreement, and can be contacted at the below referenced email or directly on my mobile at (909) 964-9932.
Thank you for providing us the opportunity to continue to serve you.
Sincerely,
Ghazala Khan
President
CITY OF DOWNEY PROJECTSOVER MANAGED CONTRACTS235+85+MUNICIPALITIESSouthern California22+FOR
Table of Contents
On-Call Public Works Construction Management, Inspection and Materials Testing Services A. Executive Summary 1
B. Qualifications and Experience 2
C. Approach and Scope of Work 11
D. Organizational Chart 15
E. Resumes 16
F. Letters of Recommendation 23
G. Fee Schedule 24
Table of Contents
Section A
Clients:
Caltrans
City of Anaheim
City of Baldwin Park
City of Brea
City of Colton
City of Cerritos
City of Downey
City of Duarte
City of Glendale
City of Irvine
City of Lancaster
City of Los Angeles
City of Moreno Valley
City of Norwalk
City of Pico Rivera
City of Placentia
City of San Diego
City of Santa Ana
City of Santa Fe Springs
City of Santa Monica
City of South El Monte
City of South Pasadena
City of Temecula
City of Whittier
Eastern Municipal Water
District
High Desert Water
District
Inland Empire Utilities
Agency
LA Metro
Los Angeles DWP
A. Executive Summary
GK & Associates - A Leading Public Works Consultant for over twenty-two years Legal Corporate Name: EC & AM Associates, Inc. dba GK & Associates, also referred to herein as “GK” or “the Firm” or “the Company” Overview
GK & Associates specializes in Construction Management, Inspection, and public outreach services designed exclusively for municipalities in Southern California.
Since 2002, GK has become a leading consultant with a reputation of ensuring projects are executed on time and on budget. GK has undertaken projects involving street widening, pavement and infrastructure rehabilitation, water and sewer system upgrades, water treatment enhancements, groundwater well improvements, street scape beautification, landscaping and irrigation, “green street” initiatives, drainage system enhancements, sidewalk and curb improvements, pedestrian circulation enhancements, and installation of traffic signals, street lighting, and fiber-optic communications.
GK & Associates prides itself on building a culture of responsiveness from our local office located in Diamond Bar, CA. Our focus is in representing our respective client’s goals and needs first keeping in mind Public Safety, staying within budget and schedule. It is for that reason that we have been able to build a very prestigious clientele list as shown to the right.
Name: EC & AM Associates, Inc. dba GK & Associates Sub: G3 Materials Testing, Inc. Business Type: Corporation Year Founded: 2002 Key personnel: Ghazala Khan T: (909) 595-1940 F: (909) 595-1314 Key personnel: Email: [email protected] 3333 Brea Canyon Rd Suite #120 Diamond Bar, CA 91765 Award Winning Consultants Focused on CM & Inspection
Source: Collective experience from proposed personnel, for more information see Section B.
Executive Summary | Page 1
General Information
Ongoing
education
GK & Associates is
always fully committed
to our staff ongoing
professional education
by attending state-
of-the-art seminars,
conferences, and
attending classes
offered by professional
public works
organizations.
Workflow
Our proven success
delivering timely,
budget-conscious
services for past
City of Downey
projects, coupled
with transparent
communication
and thorough
documentation,
underscores our
commitment to
prioritizing the city’s
needs.
Management
GK & Associates
consistently ensures
adequate time is
being dedicated to the
On-Call Construction
Management /
Inspection services
by staying involved
in every step of
the projects and
requesting information
on schedules and
necessary information
in order to verify that
the projects are staying
within timeline and
budget, regardless of
the number of projects
at hand.
Full-Time
Employees
The total number
of permanent
employees we
employ ranges from
10- 15 depending
on our backlog.
Section B | Page 2Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services B. Qualifications and Experience
Overview
GK & Associates is a seasoned organization with
30+ years of collective experience in municipal
projects.
• Expert Team: Comprised of Construction Man-
agers, Inspectors, Plan Checkers, Civil Engi-
neers, Traffic Engineers, and Infrastructure As-
set Managers.
• Proven Track Record: Delivering exceptional
services efficiently, tailored to our clients’ spe-
cialized needs.
• Diverse Expertise: Offering top-quality service
at competitive rates, leveraging our team’s di-
verse and specialized knowledge.
• Client-Centric Approach: Dedicated
to understanding and meeting our
clients’ specific needs, prioritiz-
ing successful project delivery
while addressing community
concerns.
• Public Works Specialists:
Many senior members have
extensive experience in Public
Works Projects.
• Comprehensive Services: Special-
izing in Design, Civil Engineering, Traf-
fic Engineering, Drainage Plan Checking,
Project Management, Asset Management,
and Construction Management for public
works projects.
Services
We offer top-notch project management tailored
to Greater Los Angeles cities and agencies
exclusively, adhering to industry standards like the
Public Contract Code, “the green book,” CALTRANS
Standard Specifications, Uniform Building Code,
ADA, and local regulations. From initial design to
construction, we’ve got it covered.
Project Management - Time & Resources
Every single project at GK & Associates starts
with a detailed Project Management Plan (PMP).
Among others, major components of the PMP
include project schedule, task by task budgets,
manpower assignments, project coordination and
communication procedures, sub consultant roles
and responsibilities, project filing/documentation
procedures, QA/QC requirements, and a risk
register, which identifies potential risks, risk
triggers, and mitigation measures. For construction
projects, templates for daily reports and weekly
project meeting agendas are also included. We
utilize VPM (Virtual Project Manager) for
construction projects for clients, which is
a web-based platform for monitoring
schedules (Microsoft Office or Primavera
P6), budgets, and earned revenue
reporting. It can also interface
with daily reports, progress
photographs and other
construction information. In
addition, we are currently using
Procore, Microsoft Project, CIPO,
Dropbox, Primavera P6, VPM, and
several other programs based on each
client’s preferences. This information can
be made available electronically to all stake
holders.
The planning in our PMP aims to ensure we
have enough time and resources to meet project
deadlines. If risks related to resources or schedules
are identified in the risk register, we clearly outline measures to mitigate them. Drawing from our
experience with staffing for the City of Downey,
we’re committed to meeting project demands
outlined in our approach. We’ve assessed our
workload and resources to ensure no conflicts
will divert staff from this project. GK holds active
certifications including WBE, MBE, SBE, SB, CBE,
with Caltrans, Metro, City of Los Angeles, and
various others.
W/MBE SB/MBE SB
GK & Associates Certifications
Section B | Page 3Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services
1. Street rehabilitation
improvements
2. Water main
installations
3. Installation of new
pipelines
4. Storm drain
improvements
5. Sewer and Facility
improvements
6. Rehabilitation of
existing pipelines,
storm drain systems,
and ADA compliance.
7. Slurry Seal
8. Pavement
Improvements
Construction Management,
Inspection & Engineering
services for over eight Capital
Improvement Projects.
$2,000,000 - $4,000,000 $10,000,000+$2,000,000 - $4,000,000$10,000,000+
RELEVANT EXPERIENCE
SCOPE OF SERVICES
CONTRACT VALUE
PROJECTS AWARDED
City of Brea
1. Lambert Road Rehabili-
tation Project /Imperial
Greenbelt Landscaping
Project
2. Birch Water Main proj-
ect/Lambert
3. Blackstone and La Flor-
esta Development, two
dozen plus others
1. Lambert Road Rehabili-
tation Project /Imperial
Greenbelt Landscaping
Project
2. Birch Water Main proj-
ect/Lambert
3. Blackstone and La Flor-
esta Development, two
dozen plus others
City of Downey
Construction Management
and Inspection services for
multiple CIP projects in the
City of Downey.
1. Storm drain upgrades
2. Fiber optic mods
3. Sewer rehabilitation
4. Installation of storm
drain systems
5. Intersection / Roadway
Widening
6. Major Utility Under-
grounding
7. Street Lighting / Slurry
Seal
8. Curb and Gutter
9. Sidewalk / Pavement
Improvements
10. Compliance with Cal/
OSHA Title 8
11. Compliance with Health
and Safety Laws
12. Park projects amenities
1. Firestone Blvd Water
Systems Improvement
/ Lakewood Boulevard
Street and Water
Systems Improvements
2. Paramount Boulevard
Fiber Optic Installation
Project - Phase 1 & 2;
3. Florence Avenue, etc.,
several others
IEUAInland Empire Utilities Agency
Construction Management,
Inspection, Contract
Administration and Staff
Augmentation services.
Construction Management,
Materials Testing, and In-
spection Services for multiple
CIP projects.
South Pasadena
1. Document tracking
2. Monitoring and
inspection of daily
activities
3. Coordination with
design consultants on
major re-design, Pave-
ment Improvements/
Change order tracking
and negotiations /
Dispute resolutions,
schedule monitoring
4. Storm drain / Pave-
ment Rehabilitation /
Slurry Seal/Progress
Meetings
5. Change order requests
6. Rehabilitation of ex-
isting pipelines, storm
drain systems
1. RP-4/ RP-5 SCADA Enter-
prise
2. RP-1 Flare Improve-
ments
3. RP-4/ Carbon Canyon/
RP-1/ IERCF Battery Sys-
tems
4. RP-4 Battery Storage
5. Several others
1. Storm Drain
Improvements
2. New cabinet
3. Controller and traffic
signal poles
4. Asphalt concrete
pavement
5. A raised median
6. ADA ramp upgrades
7. Concrete curbs and
gutters
8. Concrete sidewalk with
tree wells at various
locations on Bloomfield
Avenue and 166th
Street
9. DIR / OSHA compliance
10. Slurry Seal / Pavement
Improvements
1. Arroyo Park
2. 166th Street
Improvement Project.
3. Several others
* “+” On Going Contract
Section B | Page 4Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Staffing Matrix
City of Downey Experience
SERVICES
PRE-CONSTRUCTION CONSTRUCTION PHASE
Key Staff/Role Contract ReviewReview Plans and SpecificationsConstructability/Biddability ReviewPre-Construction MeetingRFI ResponsesSchedulingTeam CoordinationBid DocumentationBid EvaluationProject ManagementInspectionAdministrative SupportDocument ControlMeetingsInvoice Review/ProcessingChange OrdersCertified Payroll ProcessingAccounting in SAP/CIPO/PrimaveraLabor ComplianceSafety AdherenceRyan Walker, PE, Construction Manager P P P P P P P P P P P P P P P P P P P Joe Dyer, PE, Construction Manager P P P P P P P P P P P P P P P P P P Syed Masood, PE, Construction Manager P P P P P P P P P P P P P P P P P P Chris Marquardt, CCM, Construction Mgr P P P P P P P P P P P P P P P P P P P Daryl Lopez, Inspector P P P P P P P P P P P P P P P P P P P Heleo Espinoza, Inspector P P P P P P P P P P P P P P P P P P Dave Alcala, Inspector P P P P P P P P P P P P P P P P P P P Craig Jents, Inspector P P P P P P P P P P P P P P P P P P Armando Castaneda, Inspector P P P P P P P P P P P P P
Qiang Li, Materials Testor P P P P P P P P P P P P P P P P P P Larry Clark, Materials Testor P P P P P P P P P P P P P P P P P P Prescott Barnes, Materials Testor P P P P P P P P P P P P P P P P P Jorge Montes, Materials Testor P P P P P P P P P P P
CIP 14-13 Civic Center Drive and 3rd Street Pavement Rehabilitation Project MT CIP 14-18 Paramount Blvd Median Improvements Inspection and MT CIP 14-19 Paramount Boulevard Median Island Improvement Project Inspection CIP 15-14 Firestone Blvd Improvements Inspection and MT CIP 17-09 Paramount Boulevard Traffic Signal Upgrades and Safety CIP 20-07 Paramount Boulevard Median Island Landscape Project Inspection and MT CIP 20-24 Paramount Boulevard Landscape Improvement Project Inspection CIP 20-08 Firestone Boulevard Median Island Landscape Project Inspection CIP 20-03 Residential Street Pavement Rehabilitation Project Inspection and MT CIP 20-24 Paramount Boulevard Landscape Improvement Project Inspection CIP 21-01 FY 20/21 Annual Miscellaneous Concrete Repairs (Council District 2) Project MP347 Well No.2 Waste to Pump Discharge Project Inspection and MT CIP 22-02 Residential Rehab, Area 10 Inspection
CIP 22-19 Residential Street Rehabilitation, Area 19 Inspection CIP 22-16 Residential Streets Pavement Rehabilitation, Area 2 Inspection and MT CIP 23-01 Miscellaneous Concrete, District 4 Inspection CIP 24-04 3rd Street Pavement Rehabilitation Project Inspection and MT CIP 20-06 3rd Street Rehabilitation Inspection
Permits Inspections
CIP 20-32 Installation of New Traffic Signal on Paramount Blvd. at De Palma Street 13+ Years of Excellent Project Execution
Source: Management at GK & Associates MT: Materials Testing There may be more projects not mentioned.
Resident Project Representative
Resident Project Representative
Resident Project Representative
Resident Project Representative
Resident Project Representative
Section B | Page 5Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Project 1 - City of Downey
GK & Associates is currently providing a variety
of Construction Management and Inspection
services for multiple CIP projects in the City of
Downey. Past and current projects vary in size from
minor traffic signal upgrades and modifications
to City-wide Fiber Optic installations to full
citywide sewer rehabilitation and intersection and
roadway widening. These projects include street
rehabilitations, storm drain systems, major utility
“undergrounding” and ADA compliance elements.
When a project involves federal funding, GK
Inspectors are responsible for maintaining field
compliance requirements as well as conducting
federally mandated contractor/employee
interviews for “end of project” and certified payroll
audits.
Quality assurance activities involve Inspection of the work including Traffic Signal Upgrades, Street Lighting, A.C pavement, dry utilities, water, sewer, storm drain, curb and gutter, and sidewalks. GK & Associates has worked on multiple projects for the City of Downey, including the Firestone Boulevard Water Systems Improvement; Lakewood Boulevard Street and Water Systems Improvements; Paramount Boulevard Fiber Optic Installation Project - Phase 1 & 2; Florence Avenue Fiber Optic City- Wide Installation Project; Bellflower/Imperial Highway Street Improvement and Utility Undergrounding Project; and multiple traffic signal modifications and new installation projects.
City of Downey -
Construction Management and
Inspection Services
Providing Construction Management,
Inspection, and Staff Augmentation services
for since 2010.
Mr. Edwin Norris, P.E.
Deputy Director of Public Works
(562) 904-7110
[email protected]
Similar Elements
9 Construction Management, Inspection, materials
testing and public outreach services
9 14+ Year Repeat Client
9 CIP Continuity
9 Also a recurring client
9 Synergy
9 Same City
2010 - ongoing
Darly Lopez
Heleo Espinza
Francisco Espinoza
Dave Alcala
GK Staff:
Section B | Page 6Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Similar Elements
9 On-call Construction Management, Inspection, and
MT
9 Monitoring and inspection of daily activities
9 Coordination with design consultants on major
re-design,
9 Change order tracking and negotiations
9 Dispute resolutions, schedule monitoring
9 Pavement Rehabilition
9 Progress Meetings
9 Change order requests
9 Prior working history 10+ years of municality
experience
Project 2 - Inland Empire Utilities
Agency
GK & Associates currently provides IEUA
construction management services and has been
providing the Agency for over sixteen years. Our
staff provides a full range of services including
contract administration, document tracking,
monitoring and inspection of daily activities,
coordination with design consultants on major re-
design, change order tracking and negotiations,
dispute resolutions, schedule monitoring, multi-
agency coordination, review of payment requests,
To specifically appoint one project we have
included the award winning Recycling Plant No.5
Battery Storage Project. This energy storage
system was designed to allow IEUA to store excess
energy from all onsite renewable energy systems
and utilize that stored energy when needed most
to peak shave. With energy cost always changing,
the battery system is able to utilize excess stored
energy at night when solar systems are offline. The
system consists of 500kw Lithium Ion batteries,
two inverters, two Net generation meters, 4 AMS
site meters, 12KV setup up transformer and one
PME switch for the point of common coupling.
With RP 5 having existing renewable systems
consisting of two bio diesel Cogeneration engines
(total 3 megawatt) 1 megawatt of solar and now
500kw of battery storage it, was a first of its
kind project. The battery system is able to use
proprietary algorithm software to learn exactly
when to disperse stored energy for maximum
cost savings for the Agency. The batteries also act
as a buffer for over producing renewable energy
to help mitigate non-export tariff violations by
absorbing and storing excess energy produced
by solar, Co Gen engines, wind turbines etc. GK
provided electrical inspection services along with
four other battery and solar projects at IEUA.
2016-2017 ASCE, Outstanding Civil
Engineering Energy Project Award
$
Saving of $10K to $15K/mth in electricity costs for the Agency Inland Empire Utilities
Agency -
Construction Management and
Inspection Services
Providing Construction Management, Inspec-
tion, and Staff Augmentation services for over
15 years.
Jerry Burke
Director of Engineering Department
(951) 993-1548
[email protected]
2010 - ongoing
Section B | Page 7Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Project 3 - City of Colton
GK & Associates has been providing professional
engineering, design, Project Management and
Inspection services for various CIP projects. A
previously completed project was the construction
of a 1.2-mile Class I dedicated bicycle and pedestrian
trail that is a vital inter-modal link between the
City of Colton and the City of San Bernardino. The
Colton Bikeway project was constructed to connect
to the new Class II bike lane on Mt. Vernon Avenue.
Most recently, GK & Associates has been assisting
the City with AutoCAD Engineering Technician staff
augmentation.
Construction work has included demolition and clean-up, minor grading, at-grade crossing traffic controls and lighting. Other work included barriers such as landscaping along the Bikeway. This project was constructed according to Chapter 1000 of the Highway Design Manual, Bikeway Planning and Design. The total project cost was estimated to be $1.7 million.
City of Colton -
Construction Management and
Inspection Services
Providing Construction Management,
Inspection, and Staff Augmentation services
for since 2016.
Victor Ortiz, PE
Public Works & Utilities
(909) 370-5551
[email protected]
Similar Elements
9 Construction Management, Inspection, materials
testing and public outreach services
9 CIP
9 On-Call
2016 - ongoing
Section B | Page 8Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Similar Elements
9 On-call CM, Inspection, and MT
9 Monitoring and inspection of daily activities
9 Coordination with design consultants on major
re-design,
9 Change order tracking and negotiations
9 Dispute resolutions, schedule monitoring
9 Pavement Rehabilition
9 Progress Meetings
9 Change order requests
9 Both on-call assignments CM, Inspection, and MT
Project 4 - City of Moreno Valley
Our Construction Manager, Mr. Chris Marquardt,
provided construction management (CM) in two
(2) of our Capital Improvement Projects with City
of Moreno Valley, Project No. 801 0089 – Citywide
Pavement Rehabilitation Program and Project No.
801 0093 – Pavement Rehabilitation for Various Lo-
cal Streets (CDBG FY21/22).
He performed all responsibilities as CM including development and supervision of project schedule, managed project communication between contractor and owner including: progress meetings, change order process, and QA/QC program. Chris verified compliance from con- tractors, subcontractors and other participants of project requirements at every stage; admin- istered progress payments to assure compliance with work milestones; Processed progress payments, RFI’s, Change Orders, payment reconciliations, and other construction management duties. Our inspectors responsibilities for each project included monitoring job site for safety is- sues, providing daily reports, taking and filing project photographs, and supervising the contrac- tor’s work performed to be per plans, standards and specifications. Our inspectors were also responsible for verifying quantities, facilitating communication between all parties, and always representing the City’s best interest. Our Construction Manager and Inspectors were able to finalize the projects on time and under budget.
City of Moreno Valley -
Construction Management and
Inspection Services
Construction Management (CM) Moreno Val-
ley, Project No. 801 0089 – Citywide Pavement
Rehabilitation Program and Project No. 801
0093 – Pavement Rehabilitation for Various
Local Streets (CDBG FY21/22).
Harold Zamora
Engineering Manager
(915) 413-3106
[email protected]
2022 - 2023
Section B | Page 9Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services Similar Elements
9 Inspection
9 Monitoring and inspection of daily activities
9 Coordination with design consultants on major
re-design,
9 Change order tracking and negotiations
9 Dispute resolutions, schedule monitoring
9 Pavement Rehabilition
9 Progress Meetings
9 Change order requests
Project 5 - CBWCD
GK & Associates provided Inspection services for the
Chino Basin Water Conservation District’s Montclair
No. 2 Inflow Spillway Replacement Project. Our In-
spector provided daily site inspections to observe
work in progress, as well as communication and
coordination of worksite inspections with Engineer,
Owner and Contractor.
The construction observation of work included demolitions, excavations, compacted fill place- ment for subgrade, testing of compacted fill, placement of concrete subgrade drainage elements, placement of concrete reinforcement and embedments, placement of concrete, testing of con- crete, placement of riprap, and compacted fill placement for final grading.
Chino Basin Water
Conservation District -
Construction Management and
Inspection Services
Providing Inspection, and Staff Augmentation
services for over 1 years.
Elizabeth Skrzat
General Manager
(909) 626-2711
[email protected]
2022 - 2023
Section B | Page 10Qualifications and Experience
On-Call Public Works Construction Management, Inspection and Materials Testing Services References
Entity / Role Description of Services Contact /Title
Inland Empire Utilities
Agency -
Construction Management and
Inspection Services
Providing Construction Management, Inspec-
tion, and Staff Augmentation services for over
15 years.
Jerry Burke
Director of Engineering Department
(951) 993-1548
[email protected]
City of Moreno Valley -
Construction Management and
Inspection Services
Provided Construction Management (CM) in
two (2) of our Capital Improvement Projects
with City of Moreno Valley, Project No. 801
0089 – Citywide Pavement Rehabilitation Pro-
gram and Project No. 801 0093 – Pavement
Rehabilitation for Various Local Streets (CDBG
FY21/22).
Harold Zamora
Engineering Manager
(915) 413-3106
[email protected]
City of Brea -
Construction Management and
Inspection Services
Construction Management and Inspection ser-
vices for over eight projects in the City of Brea.
GK & Associates’ professional consulting ser-
vices included Engineering Design, Construc-
tion Management and Inspection services for
its Capital Improvement Program.
Chino Consunji
(retired)
(714) 686-8911
Delfino.chino.Consunji@
gmail.com
City of Cerritos -
Construction Inspection Services
Construction Inspection Services for the mod-
ification of Traffic Signal at Bloomfield Avenue
and 166th Street, Funded by HSIP which was
subject to federal guidelines. This project also
consisted of a new cabinet, controller and traf-
fic signal poles, asphalt concrete pavement, a
raised median, ADA ramp upgrades, concrete
curbs and gutters and a concrete sidewalk
with tree wells at various locations on Bloom-
field Avenue and 166th Street.
Dario Simoes
Deputy Director
(562) 916-1219
[email protected]
City of Downey -
Construction Management and
Inspection Services
Past and current projects vary in size from mi-
nor traffic signal upgrades and modifications
to City-wide Fiber Optic installations to full
citywide sewer rehabilitation and intersection
and roadway widening.
Desi Gutierrez
Principal Civil Engineer
(562) 619-3469
[email protected]
City of Glendale -
Construction Inspection Services
GK provided staff augmentation for CM and
Inspection including Doran Street, Brand
Boulevard, and Glendale Avenue Street Im-
provement Projects for over 12 years includ-
ing demolition inspection, new water supply
underground
Gary Edsall
Construction Services Manager
(818) 937-8226
[email protected]
Section C
Approach and Scope of Work | Page 11
On-Call Public Works Construction Management, Inspection and Materials Testing Services Technology Driven
GK & Associates is well versed in Procore, Microsoft Project, Dropbox and several other Internet-based software to keep project documents efficiently organized and shareable between all involved parties.
This is especially necessary and important to keep projects organized, within budget and within timeline, when we are managing several large projects at once.
Sample Calendar
Please see an actual sample calendar requested by the City of Downey.
Activity ID Activity Name Original Duration Start Finish Total Float Paramount BoulevaParamount Boulevard Traffic Signal Upgrades and Safety Enhancements - Base 166d 14-Sep-20 01-Mar-21 0d Keydates & MilestonKeydates & Milestones 166d 14-Sep-20 01-Mar-21 0d KeydatesKeydates 117d 14-Sep-20 01-Mar-21 0d
MIL-1330 Project Duration 117d 14-Sep-20 01-Mar-21 0d
MIL-1000 Notice to proceed 0d 14-Sep-20 0d
MIL-1310 Mobilization 6d 06-Nov-20 13-Nov-20 0d
MIL-1320 Final Completion 0d 01-Mar-21*0d
MilestonesMilestones 92d 16-Nov-20 19-Feb-21 11d
Gardendale Street & ParamGardendale Street & Paramound BLVD 71d 16-Nov-20 28-Jan-21 32d MIL-1300 Start 0d 16-Nov-20 103d
MIL-1280 Duration 71d 16-Nov-20 28-Jan-21 32d
MIL-1290 Finish 0d 28-Jan-21 32d
Quill Dr & Paramound BLVQuill Dr & Paramound BLVD 69d 23-Nov-20 02-Feb-21 27d MIL-1270 Start 0d 23-Nov-20 96d
MIL-1260 Duration 69d 23-Nov-20 02-Feb-21 27d
MIL-1250 Finish 0d 02-Feb-21 27d
Alameda Street & ParamoAlameda Street & Paramound BLVD 70d 03-Dec-20 13-Feb-21 17d MIL-1240 Start 0d 03-Dec-20 87d
MIL-1230 Duration 70d 03-Dec-20 12-Feb-21 17d
MIL-1220 Finish 0d 13-Feb-21 17d
Stewart and Gray Road & PStewart and Gray Road & Paramound BLVD 66d 03-Dec-20 09-Feb-21 21d MIL-1210 Start 0d 03-Dec-20 87d
MIL-1200 Duration 66d 03-Dec-20 08-Feb-21 21d
MIL-1190 Finish 0d 09-Feb-21 21d
Brookmill Road & ParamoBrookmill Road & Paramound BLVD 69d 09-Dec-20 18-Feb-21 12d MIL-1180 Start 0d 09-Dec-20 81d
MIL-1170 Duration 69d 09-Dec-20 17-Feb-21 12d
MIL-1160 Finish 0d 18-Feb-21 12d
Florence Ave & ParamounFlorence Ave & Paramound BLVD 14d 30-Jan-21 13-Feb-21 17d MIL-1150 Start 0d 30-Jan-21 31d
MIL-1140 Duration 14d 30-Jan-21 12-Feb-21 17d
MIL-1130 Finish 0d 13-Feb-21 17d
Lubec Street & ParamoundLubec Street & Paramound BLVD 55d 08-Dec-20 03-Feb-21 27d MIL-1120 Start 0d 08-Dec-20 82d
MIL-1110 Duration 55d 08-Dec-20 02-Feb-21 27d
MIL-1100 Finish 0d 03-Feb-21 27d
Suva Street & Paramound Suva Street & Paramound BLVD 59d 10-Dec-20 09-Feb-21 21d MIL-1090 Start 0d 10-Dec-20 80d
MIL-1080 Duration 59d 10-Dec-20 08-Feb-21 21d
MIL-1070 Finish 0d 09-Feb-21 21d
Gallatin Road & ParamounGallatin Road & Paramound BLVD 36d 14-Jan-21 19-Feb-21 11d MIL-1060 Start 0d 14-Jan-21 47d
MIL-1050 Duration 36d 14-Jan-21 18-Feb-21 11d
MIL-1040 Finish 0d 19-Feb-21 11d
Vista Del Rosa & ParamouVista Del Rosa & Paramound BLVD 54d 18-Dec-20 12-Feb-21 18d MIL-1030 Start 0d 18-Dec-20 72d
MIL-1020 Duration 54d 18-Dec-20 11-Feb-21 18d
MIL-1010 Finish 0d 12-Feb-21 18d
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
2020 2021
Project Duration, Project Duration
Notice to proceed, 14-Sep-20
Mobilization
Final Completion,
Start, 16-Nov-20
Duration, Duration
Finish,
Start, 23-Nov-20
Duration, Duration
Finish,
Start, 03-Dec-20
Duration, Duration
Finish,
Start, 03-Dec-20
Duration, Duration
Finish,
Start, 09-Dec-20
Duration, Duration
Finish,
Start, 30-Jan-21
Duration, Duration
Finish,
Start, 08-Dec-20
Duration, Duration
Finish,
Start, 10-Dec-20
Duration, Duration
Finish,
Start, 14-Jan-21
Duration, Duration
Finish,
Start, 18-Dec-20
Duration, Duration
Finish,
Full Schedule Layout
Project Start: 14-Sep-20
Project Finish: 01-Mar-21
Data date: 14-Sep-20
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaini...
Milestone
Paramount Boulevard Traffic Signal Upgrades
and Safety Enhancements - Baseline Schedule
Prepared by: M.S.
Date Revision Checked Approved
24-Nov-20 00 A.R.
Microsoft Projects Dropbox
GK & Associates Software Utilized
Section C
Approach and Scope of Work | Page 12
On-Call Public Works Construction Management, Inspection and Materials Testing Services C. Approach and Scope of Work
Project Understanding
The City of Downey is seeking a qualified consultant
to provide on-call Construction Managers,
Inspectors and Material Testing to function in
two separate section of the Engineering Division
of the Public Works Department. Specifically,
the construction manager will be assigned to the
Capital Improvements Section as a Resident Project
Representative, who will function as a liaison
between City Engineering Division staff and the
City’s contractors on capital improvement projects
and will be responsible for the administrative
aspects of the various projects. It is also understood
The first inspector will be assigned to the Capital
Improvements Section as an inspector of the
city’s capital improvement projects and will be
responsible for overseeing the physical construction
of the various projects to ensure compliance
with project plans and specifications. The second
inspector will be assigned to the Office Engineering
Section as a Public Works Permit Inspector and
will perform day-to-day inspection activities on
construction jobs completed within public right-of-
way under an encroachment permit. This position
requires expertise in paving (asphalt and concrete),
electrical, building, landscaping and/or utilities
trades.
It is also understood that the City expects to initiate a three/ year term contract with the option to
extend three additional one-year periods.
Scope of Work
Our scope of work is focused on delivering project
management, construction management, and
inspection services in accordance with City of
Downey’s requirements. We are fully prepared to
fill all of the City’s needs as outlined above and
have summarized below some of the elements of
our approach which have broader implications in
fulfilling your expectations.
Role as Construction Manager or Inspector
The typical duties and responsibilities of the
Construction Managers and Inspectors will include:
• Inspect public works projects for the City
• Public outreach will be addressed and taken
care of by the CM.
• Act as City representative and liaison
• Ensure work progresses smoothly
• Understand plans and specifications thoroughly
• Resolve issues by communicating with City
staff, engineers, architects, and contractors
• Review construction schedules and attend
meetings
• Clarify plans and specifications
• Review contractor submissions and conduct
daily observations
• Ensure compliance with construction traffic
control standards
• Coordinate deputy special inspections and
approve materials
• Anticipate and address problems promptly
• Document work progress and prepare reports
• Review payment requests and verify completed
work quantities
• Conduct labor compliance interviews on
federally funded projects
• Conduct inspections and prepare punch lists for
project closure
• Ensure compliance with APWA Greenbook,
Caltrans, and City specifications
• Coordinate with engineering staff on project
reviews
• Verify compliance with Best Management
Practices (BMPs)
• Interact professionally with the public
• Conduct field surveys and respond to complaints
• Collect and analyze data for inspection reports
• Inspect permit projects and monitor traffic
controls
• Supervise permit holders and ensure site
security
• Coordinate construction scheduling and utility
services
• Maintain inspection logs and prepare progress
reports
• Ensure compliance with BMPs and finalize
project estimates.
Section C
Approach and Scope of Work | Page 13
On-Call Public Works Construction Management, Inspection and Materials Testing Services GK & Associates will review contractor submittals, using a standard template, for City approval. Accepted submittals will be confirmed in the field. Reviews completed within 10 days, with expedited handling for critical items.
GK & Associates ensures Contractor compliance with wage regulations through daily logs and Certified Payroll Reports (CPRs). Consultant reviews documentation related to the Countywide Local and Targeted Worker Hire Policy. Deliverables include approving payroll submittals and policy documentation.
GK & Associates will create Preliminary and Final Punchlists for non-compliant items. These will guide the Contractor until completion. Consultant will advise the City on final inspection readiness and conduct it with City staff.
GK & Associates will review warranties, manuals, and other documents post- punchlist completion. Final payment will be recommended, and Project documents electronically delivered to the City. This includes RFIs, submittals, inspection reports, and more.
Task 7: Progress Payments Review and Verification - Deliverables: Monthly Invoice Approval Task 8: Project Schedule Review - Deliverables: Submittal responses, tracking log Task 9: Construction Progress Meetings - Deliverables: Contractor’s payroll submittal and documentation related to the Countywide Local and Targeted Worker Hire Policy.
Task 10: Preliminary Final Punchlist - Deliverables: Preliminary and Final Punchlist in electronic (PDF) format.
Task 11: Close-Out Documents - Deliverables: Final documents, warranties, guarantees, and other records in electronic format.
GK & Associates will organize and conduct a pre-construction meeting with key stakeholders, including the City and Contractor, to establish communica- tion lines, discuss procedures, and address concerns. Roles, goals, and con- cerns will be outlined. The meeting will be scheduled post-Contractor selec- tion and Notice to Proceed issuance.
PREVAILING WAGE
PUNCHLIST
Section C
Approach and Scope of Work | Page 14
On-Call Public Works Construction Management, Inspection and Materials Testing Services Tasks - Deliverables
GK & Associates will review contractor submittals, using a standard template, for City approval. Accepted submittals will be confirmed in the field. Reviews completed within 10 days, with expedited handling for critical items.
GK & Associates will promptly address RFIs within 10 working days or per specifications. A standardized template will be used unless provided by the City. Critical RFIs can be expedited. All RFIs and responses will be logged and shared with the Contractor to ensure thorough responses.
GK & Associates will assess Request for Change (RFC) validity, providing an independent cost estimate. Negotiations for reasonable costs or time and materials basis will follow. Standard form responses ensure consistency. RFCs and responses will be logged.
GK & Associates will manage construction and inspections for the anticipated number of days required for the Project. Inspections ensure work meets standards. Deficiencies prompt immediate correction. Regular quality assurance reviews and monthly progress reports will be submitted to the City. Daily photo documentation and onsite meetings with Contractors will be conducted. Approval for work requiring submittals/testing is mandatory.
Inspection diaries will document progress, issues, and personnel onsite.
Coordination with stakeholders and public outreach will be ensured throughout the Project.
GK & Associates will ensure Contractor compliance with prevailing wage regulations. Daily sign-in sheets will be matched with inspector records.
Certified Payroll Reports (CPRs) must be submitted with monthly payments.
The Consultant will review CPRs and documentation regarding Countywide Local and Targeted Worker Hire Policy.
Task 1: Pre-Construction Meeting - Deliverables: Meeting agenda, sign-in sheet, electronic PDF Task 2: Submittal Review and Response - Deliverables: Submittal responses, tracking log Task 3: RFI Review and Response - Deliverables: RFI responses and tracking log Task 4: RFC Review and Response - Deliverables: RFC responses and change order tracking log.
Task 5: Construction Inspection - Deliverables: Dailies, photo documentation, progress reports Task 6: Certified Payroll Compliance and Worker Hire Review - Deliverables: Approval GK & Associates will organize and conduct a pre-construction meeting with key stakeholders, including the City and Contractor, to establish communica- tion lines, discuss procedures, and address concerns. Roles, goals, and con- cerns will be outlined. The meeting will be scheduled post-Contractor selec- tion and Notice to Proceed issuance.
********
********
CPR
Review
From
Contractor
RFI
RFI
RFI
Section D
Organizational Chart | Page 15
On-Call Public Works Construction Management, Inspection and Materials Testing Services D. Organizational Chart
Construction Inspector
Daryl Lopez
Materials Testers
Qiang Li, PH.D.,P.E.
Construction Inspector
Dave Alcala
Construction Inspector
Armando Castaneda
Materials Testers
Prescott Barnett
Construction Inspector
Heleo Espinoza
Materials Testers
Larry Clark, G.E. P.E.
Construction Inspector
Craig Jents
Materials Testers
Jorge Montes
Construction Managers
Mark Rivera, PE * Joe Dyer, PE * Syed Masood, P.E. Chris Marquardt, CCM Project Principal
Ghazala Khan, MSc, MBA *
Deputy Director of Public Works - City of Downey
Edwin J. Norris
* Key Personnel Accessible to the City 100% during working hours.
GK & Associates has hand selected the finest team for the specific needs of the City of Downey. Key personnel identified in the Organizational Chart remain with the individual project during its duration.
After contract execution the Consultant should not substitute key personnel (contract manager and others listed by name in the proposal) or sub-consultants without prior written approval by the City.
Resident Project RepresentativeResident Project RepresentativeResident Project RepresentativeResident Project Representative
Section E
Resumes | Page 16
On-Call Public Works Construction Management, Inspection and Materials Testing Services Mark Rivera, P.E.
Construction Manager
EDUCATION
• B.S. Construction
Engineering
Technology, California
State Polytechnic
University Pomona
• Registered Civil
Engineer, States of CA
(C66864)
CERTIFICATIONS
• Certified Construction
Manager (2309)
• ASCE, Design Build
Institute, U.S. Green
Building Council &
National Society of
Prof. Engineers
• National Council
of Examiners for
Engineering &
Surveying
INDUSTRY TENURE
• 24+ Years
Relevant Qualifications
Mr. Rivera, a seasoned Senior Scheduler and Certified Construction Manager, brings over 24 years of diverse experience across Infrastructure, Government, Educational, Commercial, Industrial, and Residential sectors. A licensed Professional Engineer in ten western states, he excels in project management, scheduling (Primavera and Microsoft Project), and possesses advanced proficiency in various software tools including AutoCAD and Revit Architecture. His expertise spans budgeting, cost control, leadership, and engineering design across multiple disciplines.
Relevant Experience
Riverside County Transportation Authority | PM - MeasureARiverside CIP • Compile monthly and quarterly reports for Riverside County Transportation Commission to meet new Federal Transit
Administration project reporting standards.
• Evaluate and recommend approval or rejection of contractor’s monthly progress updates for construction schedule.
• Process contractor’s monthly payment applications and assess change orders prepared by office engineer. Project Valuation:
$248M.
City of Corona | PM/Civil Engineer - Various CIP Projects • Supervised an engineering staff for the efficient preparation and production of civil engineering plans. Deliverables included; street improvement plans, sewer and water plans and rough/precise grading plans while maintaining plan check comments to a minimum for a quick turnaround in bidding and construction.
• Primary contact in the resolution of field coordination issues related to construction conflicts for offsite utilities of proposed 1000+ unit residential development. Additional design experience included the preparation of hydrology/hydraulic studies, storm drain analysis/ design and site retaining wall analysis/design
City of San Fernando, CA | PM/Civil Engineer - Phase II (Science Building and Site Infrastructure) • Updating schedules, including mentoring other project managers on the use of Primavera (P3). • Reviewed, approved and processed prime contractor and CM progress payments. • Negotiated and processed change orders. Produced separate monthly reports (cost and schedule) for client and company internal use. Project Valuation: $20M.
City of Riverside, CA | PM/Civil Engineer - Various CIP projects throughout the city of Riverside • Developed all construction budget proposals, detailed constructability reviews, scope summaries and coordinated the development of bid documents.
• Prepared and updated program schedule as well as all individual phase/project schedules. • Reviewed and processed change order proposals, submittals and requests-for- information. • Program Valuation: $50M.
City of Monterey Park | Resident Engineer - Various CIP projects throughout the City of Monterey Park • Onsite field project engineer for design-build food processing facility; effectively reviewed and processed submittals, requests-for-information and all project documentation.
Produced monthly reports, provided onsite project supervision, coordination and scheduling of subcontractors through collaborative efforts with the project superintendent. • Project Valuation Range: $100K - $25M.
E. Resumes
Resident Project Representative
Section E
Resumes | Page 17
On-Call Public Works Construction Management, Inspection and Materials Testing Services Joe Dyer, P.E.
Construction Manager
City of Bell Gardens | CM - Eastern Avenue Widening Street Rehabiliation Project • Eastern Avenue, stretching from Clara Street to Garfield Avenue, saw significant improvements, including a landscaped median, expansion to accommodate four through lanes and turn lanes, pavement reconstruction, and upgraded signing and striping. This 0.67-mile corridor serves as a vital commercial and residential hub.
• Mr. Dyer was solely responsible for the construction phase of this project. He has reviewed and approved traffic control plans. He also monitored the traffic control throughout the construction period.
City of Chino Hills | Construction Manager - Soquel Canyon Parkway Rehabilitation (2016- 2023) • Plan, design and construction administration for Soquel Canyon Parkway pavement rehabilitation working including grind and AC overlay, striping, and bike lane installation from Pipeline Avenue to north city limit. Work was performed in two phases including working with Caltrans at its on-off ramps areas. Budget: $2.5M.
EDUCATION
• BS, Civil Engineering,
Ohio State University,
1976
• Graduate Studies/
Research, M.S/
Ph.D program in
Transportation, Virginia
Tech & State University,
1976-78
CERTIFICATIONS
• Registered Civil
Engineer, State of
California
• No: C31626 (1980)
Registered Traffic
Engineer
• State of California. No:
T1200 (1984) Building
Maint./Operation
Official Level 1 & 2
• Fellow, American
Society of Civil
Engineers
INDUSTRY TENURE
• 24+ Years
Relevant Qualifications
Joe brings over 30 years of extensive experience in City Traffic, Project, and Construction Management as a Civil Engineer. In his role as City Traffic Engineer for five cities, he oversees various aspects, including design, review, approval, monitoring, construction management, inspection, and operations of traffic engineering functions. His expertise extends to managing traffic signal synchronization upgrades and specializing in Work Area Traffic Control and accident reconstruction. Joe has conducted seminars on “Work Area Traffic Control” for industry professionals and contributed to the State’s Traffic Engineers Registration examination. Additionally, he served as an expert court witness for the city of Whittier from 1986 to 2007, achieving favorable rulings in all cases. Joe’s tenure includes serving as City Traffic Engineer for major cities in Southern California, such as Whittier, Norwalk, Bell Gardens, Glendora, and Chino Hills.
Relevant Experience
City of Glendora | PM/CM - Gladstone Avenue Reconstruction Project • As Glendora’s City Engineer/City Traffic Engineer, Mr. Dyer managed public works projects, such as the Gladstone Avenue pavement reconstruction from Grand Avenue to Bonnie Cove Avenue, covering
0.9 miles. He also handled the review, approval, and administration of all traffic control measures for this project.
City of Whittier | PM/CM - Mar Vista Street Traffic Calming System • Covering 1.7 miles and passing by two schools, a public park, and a residential area, this project entailed implementing traffic calming measures along a significant route from Colima Road to College Avenue. Mr. Dyer oversaw all aspects of this project, including the review, approval, and inspection of traffic control operations throughout the construction phase.
City of Chino Hills | CM - Woodview Rd Pavement Rehabilitation (Phase 1 and Phase 2) (2019-23)
• Repave Woodview Road from Pipeline Avenue to Peyton Drive with traffic striping improvements.
• Plan, design, contract administration for the pavement rehabilitation project
Resident Project Representative
Section E
Resumes | Page 18
On-Call Public Works Construction Management, Inspection and Materials Testing Services Syed Masood, P.E.
Resident Engineer / Construction Manager
Relevant Qualifications
Mr. Masood is responsible for directing and monitoring public works construction management and inspection services, with an expertise in federally funded street improvements, managing water systems, park enhancements, and more. He has managed multi million-dollar projects in California, New York, Wisconsin, and Illinois over 35 years. His roles in- clude ensuring compliance, safety, and document adherence, managing teams, conducting meetings, handling scheduling, change orders, and payments, coordinating with agencies and consultants, and maintain- ing records. He’s well-versed in policies, specifications, and procedures, and has extensive experience with federally funded projects in line with LAPM, including CBDG and ARRA projects
Relevant Experience.
Caltrans District 7 | Resident Engineer - Joint Seal Replacement/Bridge Deck Sealing/Drainage/Highway Repavement
• As Resident Engineer, Mr. Masood oversaw joint seal replacement, bridge deck sealing, drainage, and paving on state highways in District 07 (highways 101, 118, 33, 34, and 50) in Ventura County at 42 locations.
• He managed contractor activities, personnel, submittal reviews, coordination, scheduling, and change order estimates for Caltrans Maintenance Contract. He also contributed to projects including a rock weir construction at Santa Paula Creek in Ojai, CA, and highway sign installation on highway 101.
City of Lakewood | Resident Engineer - Reconstruction of Lakeview Blvd East, Project HWQ121B4
• Mr. Masood, acting as Resident Engineer, led the project’s initiative to enhance street drainage, mitigate flooding, upgrade the sewer system, and modernize the water main.
• He managed the project from initial submittal to overseeing schedule adjustments due to utility delays, inclement weather, and DOT restrictions.
• He also reviewed and approved curb profiles, supervised critical adjustments like driveways and drainage points, and ensured compliance with ADA and DOT design specifications during catch basin installation, curbing, sidewalk and road base placement, asphalt work, and pedestrian ramp construction.
EDUCATION
• M.S. Civil Engineering,
New Jersey Institute of
Technology, Newark,
NJ, 1991
• B.S. Civil Engineering,
N.E.D. University
of Engineering &
Technology, 1988
• B.S. Biological
Sciences, University
of Karachi, Pakistan,
1982
CERTIFICATIONS
• Professional Engineer:
State of New York
#097090-6 (Since
11/2016)
• Professional Engineer:
State of Wisconsin
#33418-6 (Since
04/1999)
• Professional Engineer:
State of California –
In Progress to take
Surveying & Seismic
State Specific
Exams.
• American Society of
Civil Engineers
INDUSTRY TENURE
• 35+ Years
City of New York | Resident Engineer - Reconstruction of East Fordham Road from Southern Boulevard to Bronx River
• Mr. Masood was the Resident Engineer responsible in managing the reconstruction of East Fordham Road including drainage, sewer, street lighting, traffic work, and pavement reconstruction. • He was also involved in contractor’s daily construction activities; supervised personnel; reviewed submittals, agency coordination, scheduling, change order estimates, and preparation of reports. The Project cost was $4 million.
Resident Project Representative
Section E
Resumes | Page 19
On-Call Public Works Construction Management, Inspection and Materials Testing Services Chris Marquardt, CCM
Construction Manager
EDUCATION
• Associates Degree
in Construction
Management
CERTIFICATIONS
• Certified
Construction
Manager CCM
(CMCI)
• NASSCO (National
Association of Sewer
Companies)
• Cured in place pipe
Inspector (ITCP-
CIPP)
• Pipeline Assessment
and Certification
Program (PACP)
• Manhole
Assessment and
Certification
Program (MACP)
• ICC Reinforced
Concrete Special
Inspector
• ICC Structural Masonry
Special Inspector
• AWWA Certified
Backflow Tester
• AWWA Cross
Connection Control
Specialist
• City of San Diego
Certified Special
Inspector
• Qualified SWPPP
Practitioner (QSP)
• Qualified Industrial
SWPPP (QISP)
• Certified Erosion,
Sediment and Storm
Water Inspector
(CESSWI)
• OSHA 30,Trench
Shoring Certified,Permit
Required Confined
Space Certified
INDUSTRY TENURE
• 15+ Years
Relevant Qualifications
Mr. Marquardt has over 15 years of Construction Management and field Inspection experience working on complex public works construction projects including Street Rehabilitation and Streetscapes, Traffic Signals and Water and Sewer open cut pipeline installation, Pump Stations, trenchless pipeline installation including micro-tunneling, jack & bore, and CIPP lining as well as paving, manhole construction and ROW inspection. He has extensive experience providing storm water compliance (QSP) services to various public agencies and general contractors. Chris has worked for private firms as well as public agencies and understands responsibilities of all stakeholders. Mr. Marquardt has actively sought training and Certification throughout his career. He holds many certifications from CMAA, NASSCO, ICC, State Water Board and American Concrete Institute.
Relevant Experience
City of Moreno Valley | CM - Pavement Rehabilitation for Various Local Streets (CDBG FY 2021-22
• Mr. Marquardt provided Construction Management for the Pavement Rehabilitation Project within Moreno Valley boundaries • He effectively managed the project by holding frequent meetings and communicating with the contractor, inspector and City contacts on a daily basis.
City of Downey | CM - Paramount Blvd Traffic Signal Upgrades and Safety Enhancements
• Mr. Marquardt led the Paramount Blvd Traffic Signal Upgrades & Safety Enhancement Projects, effectively managing the federally funded initiative.
• He oversaw progress meetings, reviewed constructability, supervised inspectors, managed schedules, and addressed issues.
As Construction Manager, he conducted public outreach, surveyed sites, and ensured smooth project operations.
City of Alhambra | CM - Ramona Road Street Replacement
• Mr. Marquardt was the Construction Manager and Inspector for the street reconstruction and Traffic Signal improvement project on Marengo Avenue.
• The project included full removal of existing asphalt and subgrade followed by survey, grading and installation of new subgrade and asphalt, as well as removal and replacement of curb and gutter, new sidewalk and intersection modifications.
City of Alhambra | CM - Marengo Avenue Street Rehabilitation • Mr. Marquardt managed the Marengo Avenue street reconstruction and Traffic Signal improvement project, overseeing all aspects from asphalt removal to new installations.
• He ensured quality control, coordinated with various parties, managed construction duties, processed payments, and conducted progress meetings.
Resident Project Representative
Section E
Resumes | Page 20
On-Call Public Works Construction Management, Inspection and Materials Testing Services Daryl Lopez
Senior Inspector
4+ years with City of Downey
Relevant Qualifications & Expertise
Mr. Lopez brings over 30 years of inspection experience in public works C.I.P. projects. He retired as Senior Construction Inspector from the City of Anaheim after 22 years, and now works with the City of Downey on street/pavement projects and permit inspections. His expertise includes various street improvements such as storm drain installation, concrete work, dam enlargements, retaining walls, and more. Daryl has managed street rehabilitation projects with sewer and traffic signal upgrades, coordinating work schedules among developers, contractors, and city departments. He’s handled Federal Projects, City contracts, and ensured public safety on job sites and surrounding areas.
Project Experience
City of Downey | Senior Inspector - Telegraph Road Street Improvement Project
• Mr. Lopez provided Inspection on the street improvements on Manzanar Avenue south of Telegraph Road and on Bergman Lane east of Orizaba Avenue.
• This project included removal of existing asphalt pavement, curbs and gutters, sidewalks, fences, and landscaping; construction of new block walls, concrete curbs and gutters, sidewalks and slabs, parkway drains, guard rails and signage, adjustment of utility manhole and valve box covers to grade, and installation of pavement markings and signage; and traffic control.
City of Downey |Senior Inspector - CIP 22-04 – 3rd Street Pavement Rehabilitation Project • Mr. Lopez acting as senior inspector, provided Inspection services for the pavement rehabilitation of 3rd Street from Paramount Boulevard to Civic Center Drive. This project included the removal of existing asphalt pavement, placement of asphalt base course, and rubberized asphalt cap. • Work also includes the removal and reconstruction of uplifted, damaged, or substandard curbs, gutter, cross gutters and spandrels, sidewalk, driveway approaches, and curb ramps; adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings, and traffic control.
City of Downey | CIP 22-03 - Alleys North and South of Stewart and Gray Road Pavement Rehabilitation Project
• Mr. Lopez oversaw pavement rehabilitation on five alleys near Stewart & Gray Road, coordinating inspections among contractors, material testers, and city departments. His responsibilities included project review, construction observation, daily reporting with photos, and constant communication with all parties involved. The project involved removing existing asphalt and base materials, laying asphalt concrete, reconstructing concrete intersections, installing curb ramps, repairing damaged curbs and gutters, adjusting manholes and utility covers, and implementing traffic control measures.
Mr. Lopez managed multiple Downey projects, including street improvements on Stoakes, Meldar, Manzanar, and Vista Del Rosa, as well as residential pavement rehabilitation in Area 10 and median island improvements on Paramount Blvd. He oversaw tasks like pavement reconstruction, slurry seal application, median construction, and ADA-compliant curb ramp installation. In Anaheim, he inspected projects such as the Tustin Avenue Bridge and Street Widening, Gilbert Street Sewer, and Gilbert Street Storm Drain, ensuring compliance and coordination among stakeholders.
EDUCATION
• Long Beach City
College: GE
• Citrus College:
Public Works
Inspection, Concrete,
Asphalt and Street
Reconstruction
CERTIFICATIONS
• Concrete Inspection
• OSHA Confined Space
• Cardiopulmonary
Resuscitation (CPR)
INDUSTRY TENURE
• 30+ Years
Resident Project Representative
Section E
Resumes | Page 21
On-Call Public Works Construction Management, Inspection and Materials Testing Services Dave Alcala
Senior Inspector
Relevant Qualifications & Expertise
Mr. Alcala has over 21 years of experience inspecting the construction of electrical systems for street lighting, traffic signals, communication systems and design. His experience includes high and low voltage electrical construction and maintenance, including traffic signal installations and modifications, traffic signage, street improvements, street lighting, and fiber optic cables and conduit. He has attended various MTA and ITS sponsored traffic related classes and workshops in 170 Controllers, Traffic Signal Timing and Traffic Signal Operations.
His experience includes installation of fiber optic communication conduit, cable, splice vaults, pull boxes and field communication facilities. He has been responsible for installing and modifying traffic signals, including video detection systems, fiber optics and other equipment for various cities in LA, Orange, San Bernardino and Riverside Counties.
Mr. Alcala’s past responsibilities have included the review of plans and specifications for code, accuracy, completeness and constructability. He has responded to requests for information (RFI), change orders, shop drawing reviews, schedule observation, and project oversight.
Project Experience
City of Glendale – Mr. Alcala is currently providing construction inspection services on Traffic Signal updates with video, fiber optics and other equipment. He is also providing inspection services on several street related Rehabilitation projects.
City of Downey – Responsible for inspection of City public works projects such as traffic signals and lighting, grading and paving, water, sewers, storm drains and landscape irrigation. Inspected and observed installation of new traffic signals with video detection and fiber optics and additional equipment throughout the City limits. His work also
EDUCATION
• California State
University, San
Bernardino
(pending)
• Westech College
• Pomona
• TSOS, Transportation
Professional
Certification
Board Operations
Specialist
INDUSTRY TENURE
• 21+ Years
GK TENURE
• 4+ Years
included modification and updating several traffic signals including street related rehabilitation work. Review and observe traffic control to ensure public safety and compliance with applicable codes and standards including the California Manual of Uniform Traffic Control Devices (CAMUTCD) and Work Area Traffic Control Handbook (WATCH).
County of Riverside, Facilities Management – Inspected and observed the installation of the F/O conduit, vaults, manholes, pull boxes and cable for Riverside County Information Technology. This project connected several county buildings including the DA’s office, courthouse and jail. Mr. Alcala has also worked on the construction and modification of numerous intersections within the City of Riverside in coordination with this project.
City of Irwindale – Inspected the installation of a new traffic signal system with video detection and CCTV as well as railroad preemption. This project included cabinet setup, timing upload and interconnect system installation.
Section E
Resumes | Page 22
On-Call Public Works Construction Management, Inspection and Materials Testing Services Qiang Li, Ph.D., P.E.
G3 Materials Testing Engineer
EDUCATION / LICENSES
• PH.D. , M.S.(Civil
Engineering)
Univesity of
Florida
• B.S. (Civil
Engineering)
Dalian University
China, 2005
• Professional
Engineer, CA
91989, TX
113045, NJ
24GE05414400
Relevant Qualifications
Dr. Li brings 16 years of civil engineering experience, specializing in pave- ment materials testing and engineering. His expertise includes quality assurance program management, material testing, and inspection. With a focus on pavement material evaluation and testing, he has extensive knowledge in FAA pavement research, design, and modeling. Dr. Li excels in overseeing destructive and non-destructive testing techniques and in- terpreting pavement laboratory data. He has authored numerous pub- lications on paving material evaluation. His comprehensive knowledge and experience enable him to provide and manage the ideal inspection and testing staff for construction projects. Dr. Li brings 16 years of civil engineering experience, specializing in pavement materials testing and engineering.
LA County Public Works | Resident Engineer
On-Call Materials Testing, Pavement Mix Design, and Inspection Services|As the Materials Testing Engineer and Project Manager for this contract, Qiang effectively manages both field and laboratory testing activities and ensures the quality assurance of testing procedures and results across various projects.
City of Downey | Project Manager
Paramount Blvd Traffic Signal Upgrades and Safety Enhancements | Qiang serves as Project Manager responsible for Quality Assurance, providing as-needed technical consulting, and overseeing inspection, materials sampling, and testing services for subgrade, aggregate base HMA compaction, and minor concrete testing. His knowledge in pavement engineering and material testing plays a pivotal role in maintaining the project’s stringent standards and ensuring comprehensive quality control throughout the entire process.
County of San Diego | Project Manager / Civil Engineer
As-Needed Materials Testing and Geotechnical Consulting for Non- Federally Funded Projects, San Diego County, California | Qiang served as the Civil Engineer for the San Diego County materials laboratory and was responsible for performing Capital Improvements Program (CIP) submittal reviews, Planning & Development Services (DPS) plan reviews, lab testing results reviews for the County laboratory and third party labs, attendance at pre-construction meetings for CIP projects and performing pavement design for rigid and flexible pavements. Additionally, Qiang served as the Materials Testing Engineer and Project Manager. He coordinated field and laboratory testing activities, provided supervision and quality assurance of testing procedures and test results for slurry seal, chip seal, and AC overlay projects.
Relevant Experience
Section F
Letters of Recommendation | Page 23
On-Call Public Works Construction Management, Inspection and Materials Testing Services F. Letter of Recommendation
Inland Empire Utilities Agency City of Colton
March 4, 2024
To whom it may concern,
GK & Associates, for more than 20 years have provided construction management and inspection services to five municipalities that I have served. These included providing construction management and inspection services on capital improvement and development projects in the Cities of La Habra, Norwalk, Brea, West Covina and Downey. More recently, GK & Associates has provided inspection and materials testing services on some of Downey’s major projects, including:
• Paramount Boulevard Landscaped Median Improvements
• Paramount Boulevard Traffic Signal Upgrades and Traffic Safety Enhancements • Civic Center Drive Pavement Rehabilitation Project
• 3rd Street Pavement Rehabilitation Project
• Firestone Boulevard Landscaped Median Improvements
• Citywide Residential Streets Rehabilitation Project (several project areas) • Citywide Miscellaneous Sidewalks and Concrete Repairs (several project areas) • New Traffic Signals at Paramount Boulevard and De Palma Avenue and Fire Station No. 1 As Public Works Director/City Engineer, I personally oversaw and supervised the projects that GK & Associates managed and inspected in the City of Downey. GK & Associates has always provided exceptional service and performance on these projects. They have consistently ensured that all the projects were completed in accordance with the approved plans and specifications and that there were no cost overruns. GK & Associates’ construction managers and inspectors were always on top of the projects and made sure that all change orders were justified and well documented. In addition, their staff have been very responsive not only to requests from City staff, but also to residents in addressing their concerns and complaints. Finally, they made sure that all the projects were completed on schedule and within budget.
The City of Downey was very pleased and satisfied with the services provided by GK & Associates and would highly recommend them on future projects not only in Downey, but other cities as well.
Please feel free to contact me by email at [email protected] if you have any questions or need more information.
Very truly yours,
Delfino “Chino” Consunji, PE
Director of Public Works/City Engineer (retired)
City of Downey
City of Downey City of Downey
Section G
Fee Schedule | Page 24
On-Call Public Works Construction Management, Inspection and Materials Testing Services G. Fee Schedule
GK & Associates
standard hourly rate schedule 2024-2027
Rate Includes O/H multiplier
Effective for one year from Signed Contract Date
CLASSIFICATION 2024
2025 2026
Prevailing Wage Inspector $158-$160 $163-$165 $168-$170 Construction Manager (CCM)$165 $170 $175
Construction Manager (P.E.)$187 $193 $199
Materials Testing*Next page Next page Next page
Overtime:
Overtime for non-exempt employees will be charged at 1.5 x hourly rate; overtime for exempt employees and other classifica- tion will be charged at 1 x hourly rate.
Annual Escalation:
GK & Associates rates are subject to yearly increases based on the Consumer Price Index (CPI) Sub- Consultant
(*) G3 Quality’s fee will be calculated per required job sample testing, rather than an hourly basis and will be invoiced on a monthly basis in addition to a 5% markup, together with GK & Associates monthly invoice. Their fee proposal can be found on the following pages.
Section G
Fee Schedule | Page 25
On-Call Public Works Construction Management, Inspection and Materials Testing Services G. Fee Schedule
2024 2025 2026
$ 205.00 $ 212.18 $ 219.60
$ 174.00 $ 180.09 $ 186.39
2024 2025 2026
$ 144.00 $ 149.04 $ 154.26
$ 148.00 $ 153.18 $ 158.54
$ 144.00 $ 149.04 $ 154.26
2024 2025 2026
$ 200.00 $ 207.00 $ 214.25
Test Test Method Invoice Code 2024 2025 2026
Cylinder: Compression Strength - 6" x 12" or 4" x 8"ASTM C39, CTM 521, AASHTO T22 5002 $45.00 $46.58 $48.21
Test Test Method Invoice Code 2024 2025 2026
Cleanness Value: 1" x #4 CTM 227 2006 $261.00 $270.14 $279.59 R-Value: Aggregate Base ASTM D2844, CTM 301, AASHTO
T190 2021 $491.00 $508.19 $525.97
Sand Equivalent ASTM D2419, CTM 217, AASHTO
T176 2023 $168.00 $173.88 $179.97
Sieve Analysis with Wash ASTM C136, CTM 202, AASHTO
T27 2026 $168.00 $173.88 $179.97
Sieve Analysis w/out Wash ASTM C136, CTM 202, AASHTO
T27 2027 $142.00 $146.97 $152.11
Split Sieve Analysis (coarse/fine aggregates)ASTM C136, CTM 202, AASHTO T27 2028 $248.00 $256.68 $265.66
Soil Max. Density & Optimum Moisture: With Rock
Correction
ASTM D698, D1557, D4718,
AASHTO T99, T180 2032 $374.00 $387.09 $400.64
Max. Density & Optimum Moisture: Modified Effort D1557, AASHTO T99, T180 2034 $304.00 $314.64 $325.65 Test Test Method Invoice Code 2024 2025 2026
Coated: Bulk Specific Gravity Compacted HMA
Sample or Core
ASTM D1188, CTM 308A,
AASHTO T275 3001 $97.00 $100.40 $103.91
Extraction: % Bitumen by Ignition & Gradation ASTM D6307/D5444, CTM 382/202, AASHTO T308/T27 3008 $355.00 $367.43 $380.28
HMA Ignition Oven Correction Factor ASTM D6307, CTM 382, AASHTO T309 3012 $919.00 $951.17 $984.46
Hveem Compacted Bulk Sp, Gr. (set of 3): Paraffin ASTM D1188, CTM 308A, AASHTO T275 3015 $248.00 $256.68 $265.66
Hveem Stabilometer Test - Lab Mixed (set of 3)ASTM D1560/1561, CT 304/366, AASHTO T246/247 3016 $425.00 $439.88 $455.27
Max. Theoretical Specific Gravity [RICE]ASTM D2041, CTM 309, AASHTO T209 3023 $191.00 $197.69 $204.60
Project Manager
Classification
2024-2026 Schedule of Fees Final Rates
Professional Staff Rates Local 12
Per Hour Unless Otherwise Noted
Engineering and Consulting
Field Inspection and Technician Services
Sample Pick-Up
Classification
Sample Pick-Up Trip (within 100 miles of closest G3 Laboratory Flat Rate) Quality Assurance / Quality Control Technician
Roadway Inspector
Public Works Inspector
Classification
Staff Engineer
Laboratory Testing Services
Concrete Tests (Field Made Specimens)
Soils and Aggregate Tests
Hot Mix Asphalt (HMA), Warm Mix Asphalt (WMA), Tests
CITY OF DOWNEY | DEPARTMENT OF PUBLIC WORKS | 11111 BROOKSHIRE AVENUE DOWNEY, CA 90241 | PHONE: (562) 904-7102 | RFQ NO. 24-02 FY 2024-2027 ON-CALL PUBLIC WORKS CONSTRUCTION
MANAGEMENT, INSPECTION & MATERIALS TESTING SERVICES
DowneyCity of
DEPARTMENT OF PUBLIC WORKS
Onward Engineering | Design Smarter. Build Better
Attn: Matthew Baumgardner, P.E.
ReQUeSt foR
StAteMent of
QUALIfICAtIonS
300 S. Harbor Blvd., Suite 814
Anaheim, CA 92805
(714) 533.3050 | www.oe-eng.com
Attachment C
City of Downey March 15th, 2024
Attn.: Mr. Matthew Baumgardner, P.E.
Director of Public Works/City Engineer
11111 Brookshire Avenue
Downey, CA 90241
Subject: FY2024-2027 ON-cALL PubLIc WORKS cONStRuctION MANAGeMeNt, INSPectION AND MAteRIALS teStING SeRVIceS
Onward Engineering (OE) is delighted to present this comprehensive proposal to provide FY2024-2027 On-Call Public Works construction management, inspection and materials testing services for the City of Downey, for the RFQ NO. 24-02. We deeply appreciate the vital role that public works play in our communities, and we stand ready to offer our expertise in support of your esteemed department. Our team has provided similar services on projects throughout Southern California. OE is invested in the future of the communities we serve. We care about the projects we build. Our goal is to design smarter and build better. This means humanizing and understanding the goals for each project and then advocating in the City’s interest to achieve those goals. We view this opportunity to work with the City of Downey as a potential partnership, whereby we serve the City to improve the City’s infrastructure and leave a positive impact on the community.
Organization and safety are some of our chief priorities when handling Construction Management and Inspection projects. These two issues entail a human element which is not easily read by looking at the plans. OE understands that behind every project are the people involved, and few firms prioritize this philosophy as much as OE does.
Additionally, maintaining a positive public perception is another priority that is paramount to the success of any project. In regards to organization and public perception, we have applied multiple mediums which we use to distribute project information and we leverage them in providing communication, transparency and organization.
This allows stakeholders to understand the project, check on the status of construction and enjoy continual updates, and to communicate relevant information or concerns. These platforms include OE’s real-time project maps, an informative online web page, enhanced methods for public notification along with communication such as a customized project hotline. All this results in the public being informed, thereby developing a positive perception of those behind the project affecting them.
Our team includes Delfino “Chino” Consunji as the On-Call construction Manager, a former City of Downey Public Works Director who understands the City’s expectations and needs. His team includes Michael Nguyen and Timothy Stanley as the inspectors and a deep bench of additional inspectors the City can utilize if needed.
In closing, I would like to extend our heartfelt gratitude to the City of Downey for considering OE as your partner in advancing the City’s infrastructure. Onward Engineering attest that all information submitted with the proposal is true and correct. For any inquiries or the need for additional information, please do not hesitate to reach out to us at: (714) 533-3050, or by email at: [email protected]. We genuinely appreciate the privilege of the opportunity to serve the City of Downey and eagerly await the prospect of contributing to the success of your projects.
Thank you,
Majdi Ataya, PE
President, Onward Engineering
Onward Engineering
300 S. Harbor Blvd., Suite 814
Anaheim, CA 92805
(714) 533.3050 | www.oe-eng.com
Cover Letter
Onward Engineering | Design Smarter. Build Better.Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services | OVeR LetteRc
Pages
Table of Contents
tAbLe OF cONteNtS
fiRM MAnAgeMent AnD oRgAnizAtion
Firm’s general information - 01
Resident Project Representative - 02
References - 03
Fee Schedules - 04
Key Personnel - 05
Relevant Projects - 09
Organizational Chart - 11
Project Management Approach - 12
CM & Inspection Scope of Work - 13
Project Controls - 14
Public Outreach - 15
Orange Vest Application - 17
Construction Management QA & QC - 23
Onward Engineering | Design Smarter. Build Better.Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services | AbLe OF cONteNtSt
FIRM’S eXPeRIeNce
FIRM PRINcIPAL AGeNt
We have invested in advanced tools that streamline internal and City communications. Microsoft Teams serves as our efficient platform for project progress updates, while Box Enterprise grants the City real-time access to review project documents. OE will utilize ORANGe VeSt© for construction reporting on this project. ORANGe VeSt© is our proprietary construction tool, which allows us to document work in real time, and have those quantities, materials, labor, and equipment automatically update Quantity Sheets, Earned Value Charts, Cost Over Time Charts, Quantity Over Time Charts, and Percent Complete Over Time Charts. It also allows us to proactively monitor bid items that are nearing 75% complete and keep track of any overages. The Orange Vest Application also allows us to generate Field Notifications, manage Punch-Lists, automatically generate Weekly Statement of Working Day reports, and manage Potential Change Orders, Unit Price Change Orders, and Contract Change Orders. Those reports will be available to the City’s Project Manager as PDF reports in Box. OE is also familiar and can use other software such as Procore (which we know the City is familiar with but is a bit nonintuitive to use) and VPM.
Our experience is primarily on street, alley, and roadway improvements, including grind and overlay, reconstruction, maintenance (slurry and crack sealing), widening, beautification, traffic improvements, and pedestrian accessibility improvements. Our experience also extends to water, sewer, storm drain, and park improvement projects, as well as water main utilities check and relocation, drainage and sewer maintenance and reconstruction.
Majdi Ataya, Principal-In-Charge of Onward Engineering, is a seasoned Professional Engineer with over 43 years of solid experience in the public works sector. As a former Deputy Director and City Engineer for the City of La Habra and La Habra Heights. Majdi brings invaluable expertise to every public works project. He is known for his outstanding communication, adaptability, and enthusiasm for each project. Majdi is committed to making sure that OE can be a dependable extension of your staff, We have named Delfino “Chino” Consunji as the proposed On-Call Construction Manager, with a team of additional CMs on standby if needed. As for Inspection, we have named Michael Nguyen as the inspector assigned to the Capital Improvements Section and Joe Zamarripa as the inspector assigned to the Office Engineering Section as a Public Works Permit Inspector. We also have a deep bench of inspectors available to handle increased workloads.
StAteMe Nt OF quALiFicAtiONS
At Onward Engineering (OE), our mission is to set a new standard of excellence in consulting services for our clients, ultimately enhancing the quality of life in the communities we serve.
MISSION StAteMeNt
Incorporated Year 2004
as a “c” Corporation in
the state of CA. 20 Years
in business 32 Employees
DeSIGN Engineering
PROject Management
cONStRuctION Management
StAFF Augmentation
PLAN Check
cONStRuctION Inspection
Onward Engineering
300 S. Harbor Blvd.
Suite 814, Anaheim, CA 92805
(714) 533.3050 | [email protected]
OE does not currently have a Fax Number
LeGAL NAMe &
ADDReSS
California Secretary of
State business entity
number: C2640309
FiRM DetAiLS
PROFeSSiONAL
SeRVIceS FiRM HIStORY
FiRM’S GeNeRAL iNFORMAtiON
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 1Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services iRM MANAGeMeNt AND ORGANizAtiONF
BIO: Delfino “Chino” Consunji is an experienced professional engineer specializing in the design, construction, project management and inspection of buildings, private development and public works projects. Chino’s experience includes working for engineering consultants, contractors, developers, construction management firms and municipal agencies. He has served as City Engineer for the Cities of La Habra, Norwalk, Brea, West Covina and Downey and as Public Works Director for West Covina and Downey. He has managed the design and construction of over 500 projects with a total contract amount of more than $500 million over the last 37 years. These projects included arterial highways and residential streets rehabilitation; intersection widening improvements; traffic signal upgrades and safety enhancements; water, sewer storm drain and NPDES improvements; building and facility improvements; and park improvement projects. Chino is a Registered Professional Engineer in the State of California. tIMOtHY StANLeY
INSPectOR FOR tHe OFFIce eNGINeeRING SectION
BIO: Tim is a Public Works Inspector with 32 years of experience working almost exclusively as a Public Works Inspector for a variety of cities including the cities of Anaheim, La Quinta, Murrieta, Mission Viejo, Fremont, and Hawthorne. Tim’s experience includes projects of all sizes. His accuracy and efficiency in the field ensures a successful and well-documented project, from construction through closeout. Tim’s work will always include making sure that the jobsite is safe and that the contractor is efficient with his time. He has worked on community facilities, and roadway projects including traffic signal, storm drain, sewer and water projects. His experience and familiarity with Caltrans makes him a valuable addition to any Public Works Inspection team.
BIO: Michael worked for 16 years as a Construction Inspector to a Supervising Construction Inspector for the County of Orange, the highest attainable position in the County’s inspection series (Principal Construction Inspector was converted to Administration Manager I recently). His typical duties include providing daily construction reports, documenting labor and equipment on-site each day and hours worked; measuring, calculating, and recording all construction measurements and quantities, ensuring safety for construction site and NPDES compliance for State/Regional Water Quality Control Boards, and taking work in progress and site photos. While at the County of Orange, he was known as the Slurry King due to his ability to document and track quantities in a precise way.
BIO: Aragon Geotechnical, Inc. (AGI) is a full-service laboratory, located in Riverside, California provide geotechnical engineering, geology, special inspections and materials testing services for public and private agencies throughout MIcHAeL NGuYeN
ARAGON GeOtecHNIcAL, INc.
INSPectOR FOR tHe cAPItAL IMPROVeMeNtS SectION
MAteRIALS teStING FIRM
DeLFINO “cHINO” cONSuNjI - Pe
cONStRuctION MANAGeR
QUALIFICATIONS: 16 Years Inspection for the County of Orange | AA Degree Industrial Technology California Polytechnic Universtiy, Pomona | 60 Units Mechanical Engineering California Polytechnic Universtiy, Pomona QUALIFICATIONS: Geotechnical Engineering, Engineering geology, Hydrogeology, Earthquake Engineering, Pavement Design and Testing, Concrete and Steel Inspections and Testing, Non-Destructive Testing and Specialized Inspection services
QUALIFICATIONS: Caltrans Certified CTM-375: AC Pavement In-Place Density | CTM-201: Sample Preparation | CTM- 539: Concrete Sampling CTM-533: Ball Penetration | Coursework Public Works Inspector & Business Administration and Computer Technology
QUALIFICATIONS: BS Civil Engineering, University of the Philippines, 1986 | Certificate: Engineering Management for Construction, UCLA Extension, 1991 | Certificate: Building Construction & Management, AOTS Japan, 1990 | Certificate: Inland Navigation & Management, IFIT Belgium, 1989 | PE Professional Engineer #57908, EXP: JUNE 30, 2024 Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 2Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services ReSiDe Nt PROject Re PReSeNtAtiVe
tiM b i RtHiS
e
L
Sen
ior Civi l E n gineerMic H A eL M
A
i
Civil En g i n eerKe V iN KO
P
roject M a n agerMauna Loa Ave. Residential Street
Improvements & Water Main Installation
Merced Avenue Linear Park
Project (CIP 003)
Cycle 1 Water Main
Infrastructure Improvement
N. Concourse Avenue Street
Improvement Project
Local Streets Rehabilitation Phase I
(Concrete Improvements) Zone 3
(626) 914-8217
[email protected] 116 E. Foothill Boulevard,
Glendora, CA 91741
(626) 580-2250
[email protected]
11333 Valley Boulevard
El Monte, CA 91731
(310) 802-5368
[email protected] 3621 Bell Avenue,
Manhattan Beach, CA. 90266
ALbeR t M eND
OzAD
e
puty D i r e ctor(323) 887-1200 x469
[email protected]
1600 W Beverly Boulevard,
Montebello, CA. 90640
(562) 929-5723
[email protected] 12700 Norwalk Blvd., Room 11,
Norwalk, CA 90650
PRojeCt titLe
PRojeCt titLe
PRojeCt titLe
PRojeCt titLe
PRojeCt titLe
RefeRenCe
RefeRenCe
RefeRenCe
RefeRenCe
RefeRenCe
GLeN W .c. K
A
uP
E City E n g in eerSouthern California and is a Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) certified by the State of California. AGI is committed to providing geotechnical, geological, materials testing, and inspection services with a high degree of professional excellence and proficiency. AGI strives to offer their clients individual attention and provide innovative solutions at a competitive cost. AGI’s personnel collectively have decades of experience, enabling public and private clients to draw from a pool of talented professionals in the fields of geotechnical engineering, engineering geology, hydrogeology, earthquake engineering, pavement design and testing, concrete and steel inspections and testing, non-destructive testing and specialized inspection services. AGI’s staff regularly attends scientific conferences to stay abreast of cutting-edge technologies and new developments in their fields of experience.
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 3Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services ReFeReNceS
HOuRLY RAte ScHeDuLe
The hourly rates above are our fee schedule. Any additional work will be negotiated utilizing those hourly rates.
Costs include office overhead and are fully burdened and include all reimbursable expenses. Inspector mileage only around the jobsite will be billed at the IRS rate.
Our multiplier depends on the position and person. However, all of our inspectors are paid prevailing wage rates which are currently around $83 and set to increase. Our multiplier for inspection is 1.75 which gets us to $145/hour. For CM it depends on the person, but our average multiplier is 1.55.
*OE pays all Construction Inspectors prevailing wage rates in compliance with the requirements set forth by the Department of Industrial Relations (DIR) State prevailing wages under Labor Code § 1770 et seq. Labor Code §§ 1775 and 1777.7 along with the Davis-Bacon and Related Acts (DBRA) under the standards of the Community Development Block Grant (CDBG) funding as administered by the U.S. Housing and Urban Development (HUD) Department. **Hourly rate schedule is part of Onward Engineering’s quote for use in invoicing for progress payments and for extra work incurred that is not part of this RFP.
OE provides CM and Inspection services based on the project schedule at the hourly rates above. We do not bill for time not spent. We do not propose utilizing a sliding fee or percentage of construction cost. The rates above will be utilized for the duration of this project and will remain in effect for at least 2 years, after which, OE will access and make a request for increases based on the CPI. We understand that these requests will need to be made in writing 60 days before June 30th of each year and will keep that in mind. 300 S. Harbor Blvd., Suite 814
Anaheim, CA 92805
(714) 533.3050 | www.oe-eng.com
cONStRuctION MANAGeMeNt & INSPectION
role cost (hourly)
Construction Manager $185.00
Construction Inspector*$145.00 (OT $185)
Public Outreach $90.00
StAFF AuGMeNtAtION
role cost (hourly)
City Engineer $200.00
Director of Public Works $210.00
Permit Technician $80.00
ADMINIStRAtION & MISceLLANeOuS
role cost (hourly)
Plan Checker $160.00
Administrative $75.00
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 4Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services ee ScHeDuLeSF
ConStRUCtIon MAnAgeR
QUALIfICAtIonS
BS Civil Engineering, University of the Philippines, 1986 | Certificate: Engineering Management for Construction, UCLA Extension, 1991 | Certificate: Building Construction & Management, AOTS Japan, 1990 | Certificate: Inland Navigation & Management, IFIT Belgium, 1989 | PE Professional Engineer #57908, EXP: JUNE 30, 2024 eXPeRIenCe
fy2019/2020 ReSiDentiAL StReetS RehAbiLitAtion, Downey
As Public Works Director/City Engineer, Chino oversaw the design, bid and contract award process, construction and inspection of this project. This project rehabilitated 35 residential streets or approximately 7 miles of existing asphalt pavement in the south half of the City with a total cost of $2.8 million. Rehabilitation included reconstruction and overlay of the existing asphalt pavement. This project also included removal and replacement of damaged and/or uplifted concrete sidewalks and curb and gutter and reconstruction of curb access ramps in accordance with current ADA standards.
Funding for this project came from Measure R, Senate Bill 1, Vehicle Impact Fees and Developer Funds. fy2018/2019 ReSiDentiAL StReetS RehAbiLitAtion, Downey
As Public Works Director/City Engineer, Chino oversaw the design, bid and contract award process, construction and inspection of this project. This project rehabilitated 43 residential streets or approximately 6 miles of existing asphalt pavement in the north half of the City with a total cost of $2.3 million. Rehabilitation included reconstruction and overlay of the existing asphalt pavement. This project also included removal and replacement of damaged and/or uplifted concrete sidewalks and curb and gutter and reconstruction of curb access ramps in accordance with current ADA standards.
Funding for this project came from Measure R, Senate Bill 1 and Vehicle Impact Fees. 3RD StReet PAveMent RehAbiLitAtion, Downey
As Public Works Director/City Engineer, Chino oversaw the design, bid and contract award process, construction and inspection of this project. This project reconstructed 1 mile of existing asphalt pavement on 3rd Street from Old River School Road to Paramount Boulevard. This project included replacement of damaged concrete sidewalks, curb and gutter, driveway approaches and reconstruction of curb access ramps to comply with current ADA requirements. The total cost of the project was $700,000 with funding coming from the $30 million Measure and Measure R Bond Proceeds. 5th StReet PAveMent RehAbiLitAtion, Downey
As Public Works Director/City Engineer, Chino oversaw the design, bid and contract award process, construction and inspection of this project. This project reconstructed approximately 0.5 mile of existing asphalt pavement on 5th Street from Lakewood Boulevard to Brookshire Avenue. This project included replacement of damaged concrete sidewalks, curb and gutter, driveway approaches and reconstruction of curb access ramps to comply with current ADA requirements. The total cost of the project was $610,000 with funding coming from the $30 million Measure and Measure R Bond Proceeds. fLoRenCe AvenUe PAveMent RehAbiLitAtion, Downey
As Public Works Director/City Engineer, Chino oversaw the design, bid and contract award process, construction and inspection of this project. This project reconstructed approximately 0.7 mile of existing asphalt pavement on Florence Avenue from Brookshire Avenue to Tweedy Lane. This project included replacement of damaged concrete sidewalks, curb and gutter, driveway approaches and reconstruction of curb access ramps to comply with current ADA requirements. The total cost of the project was $1.7 million with funding coming from Measure M and Proposition C funds.
DeLFiNO “cHiNO” cONSuNji
fieLDS of eXPeRtiSe:
eXPeRienCe
37 YeARS OF
ADA RAMP SIDEWALKPAVEMENT WIDENINGROADWAY
key PeRSonneL
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 5Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
DRAINAGEPARKWATERADA RAMP
QUALIfICAtIonS
Caltrans Certified CTM-375: AC Pavement In-Place Density | CTM-201: Sample Preparation | CTM-539: Concrete Sampling CTM-533: Ball Penetration | Coursework Public Works Inspector & Business Administration and Computer Technology eXPeRIenCe
IngLewooD AvenUe & fLAgLeR LAne ReSURfACIng, ReDonDo beACh Tim provided Construction Inspection services to the City of Redondo Beach on the Inglewood Avenue and Flagler Lane Resurfacing Projects. The project limits are on Inglewood Avenue between Grant Avenue and 190th Street (3,800 linear feet) and on Flagler Lane from 190th Street to Beryl Street (1,060 linear feet) adjacent to the Dominguez Park and Redondo Beach Dog Park. The project includes asphalt and concrete removals, street resurfacing, driveway and alley approaches, cross gutter and spandrel construction, ADA curb ramp construction, utility adjustment, cross gutter replacement, slot paving, signing and striping, tree removal and installation, seal coating, traffic loop detector installation, and other items per plans and specifications. eLM StReet ReSURfACing & wAteRLine RePLACeMent, bReA
Tim was a Senior Inspector for the City of Brea. The project’s roadway improvements spanned 4,100 LF and included a 2-inch cold mill, 2.75-inch Type III-B2 base course, and a 2-inch ARHM overlay. The scope also included widening the street to accommodate 5-foot sidewalks, replacing access ramps to meet ADA standards, installing 2 new cross-gutters, repairing 2 additional cross-gutters, and replacing several homeowner driveways. Furthermore, the waterline improvements included abandoning a 6-inch main, connecting 7 side-street water lines to the existing 12-inch water main on Elm Street, installing 42 water valves ranging in size from 8-inch to 12-inch, connecting 62 existing water services to the 12-inch main, and installing 12 new fire hydrant assemblies. This project required heavy traffic control and coordination with residents.
AntonIo PARkwAy wIDenIng, oRAnge
Tim was a second Senior Inspector to the County of Orange on the high-profile Antonio Parkway and La Pata Avenue Widening project. The $25 million project spanned 1.5 miles, from Ladera Ranch to 1,000 feet south of Ortega Highway, and included 1,000 LF of bridgework across San Juan Creek. Antonio Parkway was widened from four to six lanes. The bridge was widened by 40 feet to accommodate the two additional lanes of traffic. Bridgework included parkway improvements, a raised median, channel bank revetment at the south abutment, compaction grouting, and structural testing. Roadway and bridge widening occurred concurrently and included grading and cement-treated soil, 3,691 LF of RCP storm drain, riprap for environmentally friendly drainage filtering, dry utility installations, 4,993 PVC pipe, utility conduits, 4 fire hydrants, traffic signal improvements and loops, signing and traffic striping, and 448 LF of retaining wall with 42,000 pounds of steel reinforcement.
SR 205 fReewAy wIDenIng, tRACy
Tim provided on-site inspections for AC paving operations, traffic control and safety, temporary K-rail placement, earthwork operations, SWPPP monitoring and landscaping on this project which consisted of the widening of 12 miles of SR 205 freeway in Tracy, California. Tim also assisted the Resident Engineer with CCO preparation and submittals, progress payments and project documentation.
CRenShAw boULevARD ReConStRUCtion PRojeCt, LoMitA
Tim was the Senior Inspector to the City of Lomita for the Crenshaw Boulevard and Lomita Boulevard Intersection Reconstruction and Lomita Boulevard Resurfacing Project. This project called for approximately 2,325 cubic yards
ROADWAY
tiM StANLeY
ConStRUCtIon InSPeC toR
fieLDS of eXPeRtiSe:
eXPeRienCe
32 YeARS OF
CoMMUting to job Site
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 6Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
BRIDGE PAVEMENTADA RAMP
QUALIfICAtIonS
16 Years Inspection for the County of Orange | AA Degree Industrial Technology California Polytechnic Universtiy, Pomona | 60 Units Mechanical Engineering California Polytechnic Universtiy, Pomona eXPeRIenCe
StReet & SLURRy SeAL RehAbILItAtIon - PhASe III, LAgUnA beACh Michael provided full Inspection Services for the City of Laguna Beach on phase III of this project. The project limits for Phase III (2019) included two areas, Area A: Coast Royal, and Area B: South Laguna Village. These areas are in South Laguna Beach, from the neighborhoods between West Street and 10th Avenue/Sunset Avenue. The work included variable grind and overlay in some areas, and Type I Slurry Seal in other areas. There was 2,562 square feet of French Drain that was installed in Area A. A 4-inch drain line was connected to a catch basin in Area A as well. The specifications also called for new traffic signal poles at the Skyline Drive, Crestview Drive, and Fern Street Intersections. Lastly, the project encompassed parkway and curb and gutter improvements, signage and striping. Due to the residential element involved, O E provided Web Maps and a Project Hotline for affected residents, keeping them updated and informed through out the life of the project. 2017 SLURRy SeAL PRogRAM (I-139 / I-159), toRRAnCe
Michael served as Construction Inspector on this $2.5 million dollar slurry seal project for the City of Torrance covering three residential neighborhoods, as well as Camino de la Costa from Calle Miramar to the City limit; Madison Street and Hawthorne Boulevard service road between 240th Street and Skypark Drive; 240th Street from Hawthorne Boulevard to Madison Street; and arterial and collector streets on Anza Avenue, from Calle Mayor to Sepulveda Boulevard, Ocean Avenue from the Pacific Coast Highway to Torrance Boulevard, along with Madrona Avenue south of the Prairie Avenue Bridge to Sepulveda Boulevard. Four City parking lots were also slurry sealed.
AReA 6 ReSIDentIAL & CoLLeCtoR StReet SLURRy SeAL & oveRLAy RehAbILItAtIon, DIAMonD bAR Michael was the Inspector to the City of Diamond Bar on this CDBG Project. The project limits included approximately 63,360 feet (12 miles) of residential and collector streets located within Area 6, with slurry seal and overlay work.
Michael provided effective communication with the City, updated R FIs, Submittals, and CCO Logs, and helped ensure compliant work with the Contractor and Inspector. Michael also participated in public outreach services to the affected neighborhoods to ensure a seamless construction process and maintain a positive public outlook for the City of Diamond Bar.
newPoRt boULevARD SIDewALk gAP CLoSURe At gReenbRIeR RoAD, oRAnge Michael served as Supervising Construction Inspector on this $356,431 project. The work consisted of constructing a sidewalk approx. 100 feet along Newport Boulevard including a Modified Caltrans Type I Retaining Wall, a wing wall, return walls, a Caltrans Type V Retaining Wall, curb ramp, and a concrete cross gutter. Michael was actively involved with all project stakeholders, reviewed and approved drafted change orders, assisted in facilitating RFI responses, periodically reviewed daily reports, reviewed and approved progress payments and all justification backup data.
ASPhALt oveRLAy ReSURfACing, ChAPMAn Ave.-CLIffwAy DR. to eQUeStRIAn DR., oRAnge Michael served as the Construction Inspector on this project. The asphalt overlay resurfacing consisted of remedial asphalt repair work to include hand patching and removal and replacement of the damaged sections of asphalt concrete pavement, cold milling, tree trimming, placing asphalt concrete level course, placing asphalt concrete
ROADWAY
MicHAe L NGuYe N
ConStRUCtIon InSPeC toR
fieLDS of eXPeRtiSe:
DRAINAGEeXPeRienCe
32 YeARS OF
CoMMUting to job Site
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 7Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
SUb -ConSULtAnt
Aragon Geotechnical, Inc. (AGI) is a full-service laboratory, located in Riverside, California provide geotechnical engineering, geology, special inspections and materials testing services for public and private agencies throughout Southern California and is a Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) certified by the State of California.
AGI is committed to providing geotechnical, geological, materials testing, and inspection services with a high degree of professional excellence and proficiency. AGI strives to offer their clients individual attention and provide innovative solutions at a competitive cost. AGI’s personnel collectively have decades of experience, enabling public and private clients to draw from a pool of talented professionals in the fields of geotechnical engineering, engineering geology, hydrogeology, earthquake engineering, pavement design and testing, concrete and steel inspections and testing, non-destructive testing and specialized inspection services. AGI’s staff regularly attends scientific conferences to stay abreast of cutting-edge technologies and new developments in their fields of experience.
COMPANY exPerieNCe
15719 & 15755 ARRow RoUte InDUStRIAL PRojeCt, FONtANA
Aragon Geotechnical Inc. (AGI) completed preliminary geotechnical and geological assessments for the 15719 & 15755 Arrow Route Industrial Project. AGI prepared a report detailing the findings, opinions, and recommendations developed as a result of surface inspections, subsurface exploration and field tests, laboratory testing, and quantitative analyses.
The project scope included an infiltration feasibility study for stormwater BMPs, and a second site suitability investigation for on-site wastewater disposal given the lack of municipal sanitary sewer service. Data and recommendations from these studies were issued under separate cover. All geotechnical services have excluded environmental research and materials testing for contaminants in soil, groundwater, or air at the site. Nine exploratory borings were drilled within the proposed construction area to characterize local soil units. Two primary native-soil units were distinguished: (1) Distinctly yellowish brown silty fine-grained sand that forms a looser surface layer about 2 to 6 feet thick; and (2) Brown- colored, massive to crudely stratified, near-cohesionless and well-graded sand with silt, gravelly sand, and sandy gravel found site-wide below the surface layer. The silty sand unit thickens toward the southeast corner. AGI interpreted the bulk of the near-surface zone to represent wind-blown sediments deposited as low dunes and sand sheets. The deeper and much denser sediments were typical of young braided-stream alluvium and sheet flood deposits. on-CALL engIneeRIng SeRvICeS, bANNING
Aragon Geotechnical Inc. (AGI) provided On-Call Engineering Services to the City of Banning for various types of public works projects. Projects included design, plans, specifications, cost estimates, and contract documents for capital projects including street improvements, traffic engineering; storm drain improvements, sewer improvements, water improvements and wastewater improvements, as well as, plan checks. Some of the design engineering and surveying services provided included:
• Preparation of engineering quantity estimates and costs. • Engineering project management.
• Structural design.
• Survey services necessary for required scope of work. • Land surveying and map/easement or legal description preparation. • Federally and State-mandated reports required for NPDES, general construction permit. • Preparation of grading improvement plans (mass, rough and precise). • Preparation of traffic plans (signing and striping plans, traffic detour and traffic staging plans, and signals). • Preparation of street improvement plans (widening and rehabilitations). • Preparation of traffic studies/reports to ensure conformance with traffic plans. • Preparation of storm drain improvement plans.
• Preparation of hydrology and hydraulic reports.
• Water well/booster pump stations; water main distribution or transmission improvements/replacement of pipelines Sewer lines and sewer lift stations.
• Preparation of sewer improvement plans.
• Preparation of water and sewer pressure and capacity calculations and reports.
ArAgON geOteChNiCAl iNvestigAtiON & testiNg
(951) 776-0345 | [email protected]
16801 Van Buren Boulevard, Riverside, CA 92504
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 8Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
GLeNDORA MAUnA LoA Ave. ReSiDentiAL StReet IMPRoveMentS & wAteR MAin InStALLAtion CM:
DeLfino ConSUnji
InSPeCtoR:
MiChAeL ngUyen
OE provided Construction Management and Inspection services to the City of Glendora on the Mauna Loa Avenue Water Main Installation and Street Improvements Project. This project consisted of installing 6,400 LF of new 8-in. water main and 194,000 SF of street improvements that included pavement rehabilitation of grind and overlay, concrete sidewalk repairs, curb and gutter repairs, repairing 11 ADA non-compliant curb ramps, traffic signal loop replacement, signing, and striping for a total of 100 working days. The project was located along 3 streets off Glendora Avenue-Mauna Loa Avenue, Duell Street, and Linfield Street, as well as Minnesota Avenue. •Reference: Michael Mai, Associate Civil Engineer | (626) 914-8217 | [email protected] | 116 E. Foothill Boulevard, Glendora, CA 91741 •Date of the project: 2023 •Status of the project: Completed MANHAttAN beAcH CyCLe 1 wAteR MAin InfRAStRUCtURe IMPRoveMent PRojeCt InSPeCtoR:
tiM StAnLey
OE provided Construction Inspection services to the City of Manhattan Beach on the Cycle 1 Water Infrastructure Improvement Project that included the excavation and installation of over 3200 linear feet of 6-inch and 8-inch Ductile Iron Pipe, water valves, curb to curb pavement rehabilitation, ADA compliant curb ramp replacements, all appurtenant work, and 19 valves at the following 6 locations in the City, with all but Manhattan Beach Blvd. requiring street resurfacing for the entire width of the roadway: 12th Street, from Meadows Avenue to Peck Avenue; 23rd Street, from Redondo Avenue to Herrin Avenue; Manhattan Beach Boulevard, from Pacific Avenue to Sepulveda Boulevard; 17th Street, from Meadows Avenue to Rowell Avenue; 22nd Street, from Redondo Avenue to Herrin Avenue; and Herrin Avenue, from 22nd Street to 23rd Street. The project presented unique challenges in coordinating traffic control, work hours, and minimizing the impact to Meadows Elementary School. Portions with deficient fire flow capacity were selected based on pipe size and locations containing severe operations and maintenance issues in order to resolve fire flow and residual pressure, and to minimize potential for negative impacts to public health, the environment, and the number of residents impacted by main breaks, and allowing for more isolated main shutdown during emergency repairs. This project had a 220 working day schedule. •Reference: Tim Birthisel, PE, Senior Civil Engineer | (310) 802-5368 | [email protected] | 3621 Bell Avenue, Manhattan Beach, CA. 90266 •Date of the project: 2021 •Status of the project: Current N ORWALK LoCAL StReetS RehAbiLitAtion PhASe I (ConCRete IMPRoveMentS) zone 3 CM:
DeLfino ConSUnji
InSPeCtoR:
MiChAeL ngUyen
InSPeCtoR:
kevin gReen
OE provided construction inspection services on the Local Streets Rehabilitation Program Phase I (Concrete Improvements) in Zone 3, which is bound by the Union Pacific Railroad to the Northwest, the I-5 Freeway to the Northeast, Imperial Highway to the South, and Firestone Boulevard to Southwest. The project involved removal and replacement of sidewalk (3,000 SF); curb and gutter (2,600 LF); new and replacement ADA curb ramps (93 ramps and 10 truncated domes); driveway approach repairs (500 SF); cross gutter replacements (29 locations with associated curb ramps); including incidental asphalt work, utility relocations and traffic control. •Reference: Glen W.C. Kau, PE Director of Public Services/City Engineer | (562) 929-5723 | [email protected] | 12700 Norwalk Blvd., Room 11, Norwalk, CA 90650 •Date of the project: 2022 •Status of the project: Completed Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 9Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services 5 Re LeVANt PROjectS
eL MONte MeRCeD AvenUe LineAR PARk PRojeCt (CIP 003)
CM:
LUDwig SM eetS
InSPeCtoR:
tiM StAnLey
OE provided Construction Management and Inspection services to the City of El Monte on the Merced Avenue Linear Park Project, CIP 003, located on Merced Avenue between Garvey Avenue and Towneway Drive. The improvements consisted of constructing a 1.1-acre linear park within the existing roadway to provide traffic calming through lane reduction, tree planting, seating, picnic areas, play and fitness equipment, sidewalk, planting areas, protective fencing, solar lighting, trash receptacles, bike racks, stormwater retention areas, and all other work as indicated in the construction documents. Replacement of existing 6” and 8” water mainline along the east side of Merced Avenue was also included as part of this project. Additionally, OE provided public outreach support on the project. The Project was funded through the Clean California Grant Funds and Local Funds. •Reference: Kevin Ko, Project Manager | (626) 580-2250 | [email protected] | 11333 Valley Boulevard | El Monte, CA 91731 •Date of the project: 2023 - 2024 •Status of the project: Current MONtebeLLO n. ConCoURSe AvenUe StReet IMPRoveMent PRojeCt, fy 2020-21 (CP no. 880) CM:
LUDwig SM eetS
InSPeCtoR:
MiChAeL ngUyen
OE provided construction inspection services on the N. Concourse Avenue Street Improvement Project for the City of Montebello. The project limits were on N. Concourse Avenue, from W. Madison Avenue to W. Beverly Boulevard.
The work entailed a grind and ARHM overlay, and concrete improvements including gutter, driveway approaches, curb ramps, and sidewalk segments within the project limits. •Reference: Albert Mendoza, PE, Deputy Director of Public Works | (323) 887-1200 x469 | [email protected] 1600 W Beverly Boulevard, Montebello, CA. 90640 •Date of the project: 2022 •Status of the project: Current Firm Management and Organization
| 10Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
cONStRuctiON MANAGeRScONStRuctiON iNSPectORScM & INSPectORS ORGANIzAtIONAL cHARt STATEMENT: *Construction Manager assigned to a project will be the day to day contact for the City.
Both Management Contact and Construction Manager assigned to a project will not be removed or replaced from that project without the written consent of the City.
MA j DI AtAYA, Pe
bS: Civil Engineering, CSULB, 1981
MPA: Full Coursework, CSULB, 1993
Pe: Professional Engineer #39392
City of LA hAbRA:
(former) Deputy Director of Public Works
(former) City Engineer
qA/qc MANAGeR
cHRIS bOReN
LeveL I & II: Public Works Inspector-Calgary
eXPeRienCe: -Capital Improvement Projects
- Federal Funding - Caltrans Coordiination
-Nuclear Densometer Work
jOe zAMARRIPA
CeRtifieD: Public Works Inspection,
-Santiago Canyon College
MARK LueRA
CoURSeS: Public Works Interpretation &
Estimation, -Citrus College
KeVIN GReeN
bS: Psychology/Sociology/Business
-La Sierra University
CeRtifieD: Storm Water Pollution Prevention
Plan Radiation Safety
ARMANDO R. cAStAÑeDA
CeRtifieD: -Construction Inspection Work-
shop, American Public Works Association.
- Public Works Administration, MSA Educa-
tional Workshop Series.
- Reinforced Concrete Inspection
Ac
cHARLeS “cHucK” StAGNeR
eXPeRienCe: Bannaoun Engineering, Inc.
Chatsworth, California
Uhler Construction, Lake Forest, California
Alliance Street Works, Anaheim, California
cARLOS LOPez
AA: Civil Engineering Technology, LA College
4 yeARS: Supervising Construction Inspector,
-County of Orange
16 yeARS: Senior Construction Inspector,
-County of Orange
RObeRt VALLe, QsP, CIseC
QSP: Qualified Stormwater Pollution
Prevention Plan Practitioner #26670
CiSeC: CeRtIfIeD Inspector: Sediment &
Erosion Control #2075
30 yeARS: Public Works Inspector,
-County of Orange
jeFF eAtON, QsP
3 yeARS: Studies & Computer Science, CSUF,
2004
AS: Construction Management,
-Santiago Canyon College
QSP: Qualified Stormwater Practitioner
RubeN ROcHA
CeRtifieD: -General Construction Inspector
-Traffic Signal Inspector -ADA Curb Ramp
Inspector, ACI, osha, caltrans & Nuclear
Gauge.
jORGe ROque
DegRee: Civil Engineering, Instituto
Tecnologico Centro Americano, El Salvador
eXPeRienCe: Caltrans Coordination,
Trenching, Traffic Control & Safety Training
RON OSteNDORF
DeLFINO “cHINO” cONSuNjI, Pe
bS: Civil Engineering
Pe: Professional Engineer, #57908
Former City Engineer/Director of Public
Works: Downey, West Covina, Brea, Norwalk
RASHID SYeD, MPA
bS: Civil Engineering,
-Hyderabad Polytechnic Institute
bA: Public Administration, CSULB
MPA: Public Administration, CSULB
IGNAc IO O cHOA, Pe, te, PtOe
bS: Civil Engineering, CSULB
Pe: Professional Engineer #35217
te: Licensed Traffic Engineer, #1183
Ptoe: Professional Traffic Operations
(former) Director & Chief Engineer
AbbAS DARWIcHe
bS: Business & Information Systems,
-California State University, Fullerton, 2006
AA: General Education, Mt. San Antonio
College, Walnut, 2004
CeRtifiCAte: Professional Construction
Management -UCLA, 2013
LuDWIG SMeetS, Pe
bS: Civil Engineering, CSULB, 1979
MA: Military Science, A&M, 1990
US ARMy: Command & General Staff College, 1989
Pe: Professional Engineer #37221
MeMbeR: APWA, ASCE, NSPE, SAME
MuHAMMAD AtAYA, MPA
bS: Political Science, CSULB, 2008
MPA: Public Administration, CSULB, 2010
CeRtifiCAte: Construction Management, UCLA
MIcHAeL NGuYeN
AA: Industrial Technology, CalPoly Pomona
60 UnitS: Mechanical Engineering,
CalPoly Pomona
16 yeARS: Public Works Inspector,
County of Orange
tIMOtHY StANLeY
CoURSeS: Public Works Inspection, Business
Administration & Computer Technology
CALtRAnS: ceRtIFIeD 375: AC Pavement
In-Place Density | 201: Sample Preparation |
539: Concrete Sampling | 533: Ball PenetratiVP & OPeRAtiONS MANAGeR PReSiDent &
Ceo
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 11Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services RGANizAtiON cHARtO
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 12Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services PRojeCt MAnAgeMent APPRoACh
The City of Downey is requesting Project Management services that will include attending meetings, assessing and establishing project goals, strategies, and cost limitations, communicating with the City to keep them apprised of a project’s status, providing agendas and minutes for various meetings, preparing and submitting project scheduling progress updates, monitoring and controlling a project schedule, budget and quality, along with proactive general Project Management services. By implementing this approach, we feel that we are pro-actively ensuring quality and the successful management of any given project.
These steps correlate to the Project Management Institute Standards for Project Management.
QUALity PoLiCy SySteM CoMPonentS
QUALIty ASSURAnCe &
QUALIty ContRoL MAnUAL
(Design & Construction Projects)
the StAnDARD
oPeRAtIng PRoCeDURe
the PRojeCt QUALIty
ContRoL PLAn
(The Project & Site Specific QC Plan)
OE will fulfill the City’s needs and comply with all statutory and regulatory obligations with emphasis on safety, quality, schedule and maximum cost effectiveness. Our team pride themselves on the quality of the engineering services provided, making great efforts to assure that each project is of the highest quality, exceeding the needs and expectations of our valued Clients.
FIVE STEP PROJECTMANAGEMENT APPROACHOe’S
TASKS
PROJECT
SUMMARY
TASKS DELIVERABLESDELIVERABLES
FINALWALK-•Certify completion
recommendations
•Overview of completed work
•Photos
•Upcoming work
•Closures & Restrictions
PUBLiC
OUTREACH
•Mailer resident notifications
Community coordination records
•Discussion notes & dates
Actions taken
TRAFFiC
CONTROL
•Traic control notes
•Signing & striping inspection
•Traic control plans revie w
CHANGE
ORDERS
•Change order notes
•Change order recommendations
•Verify accurate records/quantities
•Ensure records back-up
GEOTECHNiCAL/
MATERiALS TESTiNG •Testing reports/Tracking log
review/comments/recommendations
CONSTRUCTiON
DOCUMENTATiON
(see job control documents &
project records)
SURVEY
MONUMENTS
•Manage/Track/Report survey
•Monument documentation
SCHEDULE
REViEW & TRACK
•Construction
schedule updates
CONSTRUCTiON
iNSPECTiON
JOB SAFETY
COMPLiANCE
•Safety infraction reports
LABOR
COMPLiANCE
•Contractor certified payroll records
•CM payroll review notes
•Employee interview forms
•Employee interview reports
WATER QUALiTY
SWPPP & BMP’S
•Weekly work reports
Caltrans CEM-4501/4601 forms
CONSTRUCTiON
MANAGEMENT
•IOR red - lines
•Contractor red - lines
•CM coordination records
•Final as-built documentation
•Non-compliance notes
•Completion recommendations
•Final report of completion
•Final punch list
NON-COM PLIANCE ITEMS
THROUGH/INSPECTION
AS-BUILT PLANS
PUNCH L ISTS
COM PLETION
RECOMMENDATIONS
FINAL PAYMENT
REQUESTS
CONSTRUCTION
DOCUMENTATION
SUBMIT
PROJ ECTFILES
LABOR
COM PLIANCE
TASKS
CONSTRUCTABiLiTY
REViEW - 90%
DELIVERABLES
•90% PS&E
•Review/recommendations
•Comments in writing
•Meeting with DE & PM
RFi COORDiNATiON •RFI response log
BiD AWARD SUPPORT •Bid analysis
MEETiNGS
(pre-construction/pre-bid/
weekly progress/coordination)
•Meeting minutes
•Meeting agenda
•Review look-ahead
schedule
SUBMiTTAL REViEW •Submial lo g
•Stamped submials
•Recommendations
ENTERPRISE
Available to the City Project Manager
via either City CMIS, or OE’s
DCRs & RFIs
Correspondence/Submials
CCOS & Progress Reports
Lab & Field Test Reports
Materials Delivery Tickets
Compliance Certification
Progress Reports/Photos
Meeting Minutes
Guarantees/Certifications
Aidavits/Leases/Easements
PROJECT FiLES
JOB CONTROL DOCUMENTS
Project Schedule & Bid Schedule
Bi-Monthly Status Reports
2nd & 4th Monday of Each Month
Weekly Statements Of Working Days
Construction Change Orders
Monthly Construction Payments
Certified Payroll Records
Labor Compliance Documents
•Final project files (per LAPM)
•Final project report
•As - built drawings
•Digital set of drawings
•Construction files
•Project Labor Agreement PLA
•Labor Compliance Clearance
•Final payment recommendations
•CM payroll review notes
•Employee interview forms
•Employee interview reports
•Preliminary punch list
•Final punch list
•Includes City tasks
PHASE CONSTRUCTION2 PHASE POST-CONSTRUCTION3PHASEPRE-CONSTRUCTION1 G
MMMM A
D
R
s
ds
ns
ds
NNNN O
T H
•Review & file daily reports
forms similar to CT CEM-4501 &
CEM-4601
•Working day statement reports
Issued weekly
•Daily photo diary
Raw image files & video (digital)
design smar ter.build better.
Firm Management and Organization
| 13Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services Firm Management and Organization
This Scope of Work is a representation of our typical Scope as applied to our projects of work. Not all line items may reflect every aspect of work on a project.M & iNSPectiON ScOPe OF WORKc This Scope of Work is a representation of our typical Scope as applied to our projects of work. Not all line items may reflect every aspect of work on a project.
PRojeC t ContRoLS
OE utilizes a set of technology-based project controls to manage the costs, schedules, and documents, thereby advancing project progress. The following sections demonstrate our ability and competence in delivering our engineering services to the City while maintaining document, schedule, and cost control. dOCuMeNt CONtrOl
OE operates on a HIPAA Certified, enterprise grade, cloud filing system that will be used on all documents and folders to ensure proper documentation and transparency. We map all of the City’s standards, folder structure, templates and document formats and store it on our cloud-based ENTERPRISE account for implementation.
This cloud-based account allows for secure, remote access and review of our entire filing system by City staff, to ensure that documentation and filing is done in compliance with the project requirements. Each City staff member attached to the project will be able to select a password which provides access to view, upload, or download any of the project files (PS&E/Schedule/Utility Logs/Field Observations/Daily Reports/Photo Diaries, etc.) without having to change the City’s existing IT framework. This document control system is also compliant with Caltrans’ LAPM filing requirements. Additionally, this flexibility allows the City staff access to the project files anywhere and on any device, as well as provide access to select files (like photos) to other collaborators. sChedule CONtrOls
OE will provide all necessary coordination hours required to ensure that the project remains on schedule. We believe that management requires proactive management in order to address issues before becoming a critical item and to avoid delays and problems. To keep projects efficient, on track, and to maintain transparency, our investment in scheduling tools include Microsoft Project MICROSOFT PROJECT and Microsoft Primavera (P6) MICROSOFT PRIMAVERA along with course work training and execution participation by our in-house staff. When OE is awarded a contract, our team updates the schedule with the Notice to Proceed date. This is then imported into our proprietary solution “Onward Collab” which the City will then have full access to. From there, OE can seamlessly document and assign tasks and subtasks.
The result is that the details and the progress of the project would be available at all times to be tracked by the City and by our QA/QC team in real-time. Project Managers are then enabled to assess the workload of every team member at any given time, so that immediate adjustments can be made to the project. The City would then have immediate access to all change details. This system also allows for back and forth dialogue regarding a specific task or subtask and can be centralized and reviewed at any point. Another view that can be utilized is the Board View involving buckets of tasks representing a team member.
Design Smarter. Build Better
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 14Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
PUbLiC oUtReACh
Having a plan for minimizing interruption, garnering public support, and maintaining a positive public perception throughout construction is critical to the overall success of a project. As such, we place an emphasis on public outreach and the dissemination of project information to affected stakeholders. We inform the public because it translates to less complaints, safer construction sites, and a smooth construction schedule.
PubliC NOtiCes
OE produces, supplies, posts, distributes and updates all public notices (PDFs) that provide pertinent project information and updates to effected residents, which we will prepare for the Contractor on behalf of the City and distribute to the residents.These notices are a great way for residents to be made aware of the project, to actually read the notices, and to follow any driving or parking restrictions. iNfOrMAtive web PAges
OE offers informative web pages, hosted on a separate sub-domain linked directly to the City’s website. This allows OE to directly produce and update all public notices (PDFs), project information and updates, and dynamic maps without requiring City time and resources through the process. The website will also include enhanced public notices which we will prepare for the Contractor on behalf of the City. These notices are a great way for residents to be made aware of the project, to actually read the notices, and to follow any driving or parking restrictions.
The purpose of this project is to rehabilitate
the distressed asphalt pavement and concrete throughout the project limits. In doing so, we hope to improve neighborhood connectivity and livability; and to enhance the
comfort, safety and aesthetics of the residents and business owners throughout the neighborhood.
The project may require a temporary closure of
certain sections of the street and limited access during construction hours.
Zone 3...............................Summer 2023
Lower Azusa Road............Spring 2024
Arden Drive.......................Spring 2024
ROADWAY REHABILITATION
and PARKWAY IMPROVEMENTS
4,000
Square Feet
SIDEWALK
43 Count
CURB RAMPS
3,000
Linear Feet
CURB/GUTTER
and SIGNING and STRIPING UPGRADES.
PURPOSEPURPOSE
SCHEDULESCHEDULE
SITE AREASSITE AREASN
W Hondo Pkwy.W Hondo Pkwy.
Santa Anita Ave.Santa Anita Ave.
Whitmore St.Whitmore St.
Chico Ave.Chico Ave.
Marybeth Ave.Marybeth Ave.
Brockway Pl.Brockway Pl.
N
NVenita St.Venita St.
Gidley St.Gidley St.
Bisby St.Bisby St.
Frankmont S
t
.
Frankmont S
t
.
Glenfair St.Glenfair St.
Marsen St.Marsen St.
Elmcrest St.Elmcrest St.
Fieldcrest St
.
Fieldcrest St
.
Haverly St.Haverly St.
Emery St.Emery St.Arden Dr.Arden Dr.Emery St.Emery St.Halifax Rd.Halifax Rd.Ranger Ave.Ranger Ave.Whitney Dr.Whitney Dr.Sha s
ta
P
l
.
Sha
s
ta
P
l
.Esto Ave.Esto Ave.Muhall St.Muhall St.
Ranchito St.Ranchito St.
E
l
M
o
n
t
e
A
v
e
.
E
l
M
o
n
t
e
A
v
e
.Doreen Ave.Doreen Ave.Hickson St.Hickson St.
Dido St.Dido St.
N
Lower Azusa
Rd.Lower Azusa
Rd.
Peck Rd.Peck Rd.
Durfee Av
e
.
Durfee Av
e
.
El Monte El Monte
Ave.Ave.
Santa Santa Anita Anita Ave.Ave.
N
Arden Dr.Arden Dr.Valley Blvd.Valley Blvd.
Lower
A
z
u
s
a
R
d.
Lower
A
z
u
s
a
R
d.Arden WayArden Way
MEETING
TO DISCUSS
UPCOMINGZONE 3
CONSTRUCTION
PUBLICNOTICE
The City of El Monte would like to invite residents and property owners in the vicinity of the upcoming construction project in the Zone 3 residential neighborhood to attend a virtual public meeting. The purpose of the meeting
is to provide information and gather feedback regarding the proposed concrete improvements and pavement rehabilitation project in the Zone 3 residential area. The meeting will be held on Monday, May 10th, 2023, at 7:00 pm, via Microsoft
Teams. The City staff and project engineers will be in attendance to present the project details, answer questions and receive comments. The City of El Monte values your input and feedback on this important project, and we encourage you to attend
this meeting to learn more about the project. Your participation is essential so that the project meets the needs and concerns of the community. Please review the map on the flip side of this brochure to see if your street is included in the limits of this project.
Thank you for your participation and support.
from The City of El Monte
INVITEINVITE
CITY ADDRESS1Will IWill I
Have AccessHave Access to Myto My Driveway?Driveway?
Vehicular access to driveways will be maintained except when necessary construction prohibits such access for reasonable periods with a minimum 48-hour notice.
3What areWhat are
the Workingthe Working
Hours?Hours?
Construction hours are from:
7am to 4:30pm. These hours
are subject to change.
All parking restrictions will be limited
to a reasonable period with a 48-
hour advance notice. Information on parking and driving restrictions will be updated regularly and is available at: oe-eng.com/elmontezone3 2Are Are there anythere any
ParkingParking
or Streetor Street
Limits?Limits?
4Will myWill my
Trash beTrash be
Collected?Collected?
The Contractor will not schedule
any work on local/residential streets
that will prevent trash pickup on the
same day as trash collection.
Q & AQ & A
WHEN
DAY, MONTH,
YEAR, TIME
WHERE
Microsoft Teams
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 15Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
To view project pages and map, please visit:
www.oe-eng.com/dbarea5
telePhONe hOtliNe
OE The City will be provided with a telephone hotline as the contact number for the duration of the project life cycle. Call logs with caller information, time of call, and voice-mail can easily be tracked, generated and saved.
Upon setup, callers are greeted by a brief pre-recorded introduction, after which a vocalized menu will offer helpful project information (ie. street closures, parking restrictions and schedule changes) with the option to be routed to a task specific staff member. This system is customizable, and it works even if phases are handled by different consultants, where the contact person can be changed throughout the course of a project. This means less headaches for the City, and it provides peace of mind to the community, knowing the option to voice their concerns and obtain information is a phone call away. iNterACtive web MAPs
OE has the tools and skills to build interactive and dynamic maps to keep the public informed. Any affected stakeholders can access our maps online for updates on detours, phasing, temporary parking, street closures, and general project limit information. OE would manage and update the site and content in real-time in accordance with City requirements. This in-turn provides the City with convenient, easy-to-access content for oversite and to disseminate valuable information.
Firm Management and Organization
| 16Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
oRAnge veSt APPLiCAtion
ORANGe VeSt © is a proprietary tool (web application and iOS application) which streamlines and organizes construction documents, built with the inspection team in mind. Orange Vest allows the CM and Inspector to document work in real-time, and to have field quantities, materials, labor, and equipment automatically update Quantity Sheets, Earned Value Charts, Cost Over Time Charts, Quantity Over Time Charts, and Percent Complete Over Time Charts. It also allows the team to proactively monitor bid items that are nearing 75% complete and keep track of any overages.
The ORANGe VeSt © application allows users to generate Field Notifications (Incident Reports), manage Punch-Lists, automatically generate Weekly Statement of Working Day reports, manage Potential Change Orders, Unit Price Change Orders, and Contract Change Orders. On the Construction Management side, it allows users to review and approve/reject submittals and respond to RFIs.
The value of this tool is unprecedented. It took our team over 4 years to develop, and it includes input from former County, District, and Public Works Professionals and Supervising Inspectors.
The following showcases further details, features and usages of this tool:
RfI MoDULe
Requests for information (RFI) –Throughout all phases of a project, questions come up. In the past, the questions would be fragmented across platforms. Some via email, some hard copy, some scanned, some via text, some over the phone. The RFI module allows you to centralize these requests and to respond to them directly. A user can submit an RFI, either as a user of the app or via a public link for each project. They also mark that RFI as Normal, Expedited, or Critical. They can also attach a PDF to that RFI if needed. Once it is submitted, the Construction and Project Manager is notified via email that an RFI has been submitted, they can respond right away, and the response will be sent directly to the original party that submitted the RFI. The system will also prioritize alerts to the PM/CM so that they address expedited and critical RFIs first. Anytime a change is made to an RFI, the program automatically makes a PDF that includes the RFI information, when an answer is added, that PDF is updated to include the answer. The system also auto-generates a PDF log of the RFIs.
SUbMIttAL MoDULe
The Submittal Module allows Contractors to submit documentation for the materials and processes that they plan to use during construction. Our Submittal Module allows the Contractor to send in the PDF (via our app or public link). The Contractor can submit that document as a new submittal or as a follow up to a previous submittal (re-submittal). The PM/CM is then notified that Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 17Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
a Submittal is posted for their review. The PM/CM can click the stamp icon and then start marking that pdf up digitally with a full suite of markup tools. When done, the PM/CM selects a status for that Submittal (Approved-No Exceptions Taken, Approved- Make Corrections Noted, Rejected, Rejected-Revise & Resubmit, Rejected-Submit Specified Item). Then a cover page is auto- generated for that marked up document, which includes an entire tracking history for that Submittal as well as a digital stamp with signature. The system also auto-generates a PDF log of Submittals (both pending and reviewed).
LiSt of feAtUReS
View project dashboard, prepare comprehensive daily reports, automatically generate weekly statement of working days, view product quantities to approve progress payments, prepare change order leveraged by real team data, access project files, sign and countersign reports, file field notifications and incident reports, submit and review construction submittals, prepare and respond to requests for information, and more.
Firm Management and Organization
| 18Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
DAShboARD At A gLAnCe
The project dashboard gives you a quick look at the project’s progress, so you know at a glance how many days are remaining, whether or not any daily reports are missing or incomplete, how much time has elapsed, the estimated earned value (automatically updated with each published daily report), the weather forecast that includes an hour-by-hour breakdown, and charting tools to dive deeper on the project’s numbers.
DAS hboARD : In-De P th
The project dashboard has three charts currently available: cost over time, which can be viewed for the project as a whole, or specifically for up to 3 bid items at a time; the quantity over time chart, showing both the cumulative & the day/week/month totals for the project as a whole or as individual bid items; the percent complete over time chart, which can be viewed for the project or for individual bid items (up to 3 at a time).
Firm Management and Organization
| 19Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
DAiLy RePoRting
The daily report is the brains of the application. We built our app with the inspector in mind, as the inspector is the eyes and ears of the project. The daily report dashboard gives the inspector his daily information at a glance. The top bar allows the inspector to jump into work performed (to track labor, equipment, and quantities completed), PCO (potential change orders), notes, tickets, punch list, and weekly recap.
biD iteMizAtion
Adding a bid item is easy, and it takes all the guess work out of it. No more typos or inaccurate bid items. These are pulled directly from the bid sheet which is uploaded to the system as a CSV file (or manually input). Once a bid item is in, you are ready to add labor and equipment hours to it, or to add quantities performed that day.
Firm Management and Organization
| 20Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
PRojeCt CLASSifiCAtionS
Once you add a bid item, assigning labor and equipment is a breeze. Just select the classification, and the system will filter only the personnel and equipment that fit that classification. You only need to type out the name and description once, and it is available throughout the project. If you prefer to put the name and description first, you can do that and the system will show you a list of classifications assigned to that person and equipment. noteS
Notes are easy to input. They can be formatted & rearranged. You can use voice text to dictate your notes when you are in a rush. Then you can edit those notes later if needed. You can also assign notes specifically to a bid item, or you can type them out as general notes.
Firm Management and Organization
| 21Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
PhotoS MAnAgeMent
Photos can be easily snapped from within the app, or uploaded from the photo library. Add photos, caption them, and rearrange to tell a visual story. No more fumbling to format or organize photos. Let ORANGe VeSt © do it for you. Also, the system captures as many photos as you take. You can take 30 photos and only include 8 in the daily report, and the 22 that are not included will automatically be saved as separate image files.
QUAntity MoDULe
The quantity module shows you the quantities for any period of time. You can view the quantities for the “prior period”, “to date:”, or “remaining”. Tapping the bid item provides a drop-down menu showing the breakdown of that bid item.
Firm Management and Organization
| 22Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
Our CMs & Inspectors will review the contractor’s weekly and daily schedules before work begins each day and closely coordinate with the Contractor to establish an understanding of the critical activities and work to be inspected.
Identify opportunities in a timely fashion so impacts to cost, schedule, quantities, and performance are realized and minimized or avoided. The primary focus is early identification of opportunities or potential risks, then finding alternative solutions to quickly implement corrective actions.
Implement tools and documents for control to support the process of Change Management and the preparation/review of change orders for District approval. The Change Management Control is used for early warning and approval control of deviations in engineering cost, cost of material and equipment, and construction during all phases.
Reports will be kept in tracking submittals, tests performed, samples taken, non -compliance reports, and inspection/testing associated with non-compliant work.
Provide construction teams with the control tools and documents to accurately estimate, plan, and monitor work to meet the project’s cost, schedule, quantities, and performance.
Facilitate communications to provide the District with the long-term visibility necessary to make proactive & informed decisions.
We’ll provide quality assurance and inspections to verify work is accurate and in compliance with applicable standards and regulations.
We’ll monitor the contractor’s Quality Control Program.
During our many years of Construction Management and Inspection experience, we’ve come to understand that success comes through a solid QA/QC plan, implemented at the onset of a project. OE implements protocol from a detailed QA/QC manual that defines roles, responsibilities, expectations, review requirements, and quality standards of all documents and procedures within the firm’s organization.
Our team brings considerable experience with keeping projects on track - experience gained on many public works construction projects in Southern California.
We believe it is imperative that we have a full understanding of the timeline of each project, from beginning to end. We can personally build CPM schedules and handle the monthly updates with the responsible agencies.
Our Construction Managers will hold meetings with the contractor to discuss the status of the schedule and identify any potential roadblocks or challenges. They will review each monthly update promptly and provide comments or acceptance after receipt of the submittal from the Contractor.
We make a point, at the start of every project, to specifically tailor the QA/QC program and work plan to the specific project needs. OE’s team approach to project controls is to achieve estimating, cost control, and scheduling objectives through conscious planning and execution of the work, and through the continuous monitoring of cost, schedule, quantities, and performance. cONStRuctION MANAGeMeNt qA & qc
goALS we Set to AChIeve whILe PRo-ACtIveLy
MAnAgIng the vARIoUS ASPeCtS of PRojeCt ContRoLS.
1 1
2 2
3 3
4 4
Firm Management and Organization
Onward Engineering | Design Smarter. Build Better.| 23Request for Statement of Qualifications, for the City of Downey, On-Call Construction Management, Inspection and Materials Testing Services
CITY OF DOWNEYFY2024-27 ON-CALL PUBLIC WORKS CONSTRUCTION MANAGEMENT, INSPECTION AND MATERIALS TESTING SERVICES Engineering Trust Into Every Project
MARCH 15, 2024
SOUTHSTAR | DCCM
RFQ No. 24-02
Attachment D
1945 Chicago Avenue, Suite C-2, Riverside, California 92507 | 951.342.3120 | DIR No.100017294 | SouthstarEng.com March 15, 2024
City of Downey
Department of Public Works
11111 Brookshire Avenue
Downey, CA 90241
ATTN: Matthew Baumgardner, P.E. - Director of Public Works/City Engineer RE: City of Downey – FY 2024-2027 On-Call Public Works Construction Management, Inspection and Materials Testing Services
RFQ Number: 24-02
Dear Mr. Baumgardner and Selection Committee:
Southstar Engineering & Consulting, Inc. (Southstar) greatly appreciates the City of Downey (City) for the opportunity to submit this proposal. Southstar is prepared to provide Construction Management, Inspection, and Materials Testing Services for a variety of infrastructure and capital improvement projects and city programs/services under the direction of the City’s Public Works Department to support the City’s Capital Improvement Program.
Southstar is the team to deliver the quality, responsiveness, innovation, and value that the City expects. This proposal will demonstrate the turn-key benefits of working with a professional construction management and inspection team with unparalleled qualifications and experience, especially when it comes to our depth of knowledge regarding Public Works CIP projects in Southern California. Southstar intends to surpass your expectations through dedication to quality, professional integrity, and service excellence. Selecting Southstar for this contract will result in successfully completed projects, on time and within budget.
Depth of Experience | For nearly 18 years, Southstar has provided top-notch CIP construction support services for a variety of agencies throughout Southern California. The Southstar team has been working for the City of Santa Fe Springs for almost 10 years and has completed a variety of CIP projects including not only roadways and playgrounds but major renovations and roofing projects. We are prepared to assist the City with any type of transportation or building infrastructure project on day 1, using the most current standards.
Benefits to the City of Downey | While Southstar’s primary office is located in Riverside, our proposed key staff generally works in the Gateway Cities subregion, or within a 5-mile radius of the City of Downey. Our proposed staff requires no learning curve and are ready to hit the ground running on day one of any tasks the project may require their services on. Southstar provides similar construction management and inspection services to other municipalities in Southern California and has similar active on-call contracts by the cities of Santa Fe Springs, Commerce, Bellflower and La Mirada. The Scope of Work related to this RFP is nearly 100% in alignment with our contract with the City of Santa Fe Springs, which is a reference of ours.
Miscellaneous | Southstar acknowledges that no Addenda was released via Planet Bids. Southstar has no exceptions and will adhere to the provisions described in the RFP without modification. Southstar understands that the proposal shall remain valid for a period of no less than Ninety (90) days from the date of submittal. Southstar attests that all information submitted with this proposal is true and correct. As Southstar’s President, I have the authority to bind the company in a contractual agreement with the City of Downey.
Again, we appreciate the opportunity to submit our qualifications to you. If you have any questions, please feel free to contact me via the information in firm profile.
Sincerely,
Southstar | DCCM
Yvette Kirrin, PE
President/Principal-in-Charge
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 iii FIRM PROFILE . . . . . . . . . . . . . . . . . . . . . . .1 EXECUTIVE SUMMARY / SUBCONSULTANT . . . . . . . . .2
ORGANIZATION CHART . . . . . . . . . . . . . . . . . .3 KEY PERSONNEL RESUMES . . . . . . . . . . . . . . . .4 REFERENCES AND RELEVANT PROJECTS . . . . . . . . . 10
PROJECT MANAGEMENT . . . . . . . . . . . . . . . . 13
PROJECT MANAGEMENT / OTHER INFORMATION . . . . . 19
FEE SCHEDULE . . . . . . . . . . . . . . . . . . . . . . 20 CIVIC CENTERCity of Downey | Downey, California
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 1 FiRM PRoFile
LEGAL FIRM NAME
Southstar Engineering & Consulting, Inc.
PARENT COMPANY
DCCM North America, LLC (DCCM)
ORGANIZATIONAL STRUCTURE
C-Corporation
DATE OF INCORPORATION
September 7th, 2006
REGISTRATIONS
DIR No: 100017294
EIN No: 20-5648626
SBE No: 1738135
HEADQUARTERS
1945 Chicago Avenue, Suite C2
Riverside, California 92507
951.342.3120
PERSONNEL
25+
SouthstarEng.com
DCCM.com
HISTORY OF THE FIRM
Founded in 2006, Southstar | DCCM has become a beacon of engineering innovation in Southern and Central California, committed to advancing the area’s public works and transportation frameworks. Our expertise spans the gamut of infrastructure development and management, including bridges, transit systems, and local projects, underscored by a keen focus on sustainability, planning, and comprehensive design.
Our reputation for flexibility and ingenuity allows us to offer bespoke solutions that precisely fit each project’s demands, guided by our core values of Quality, Value, Innovation, Responsiveness, and Trust. Southstar champions diversity, equity, and inclusiveness, drawing exceptional talent committed to not just professional excellence but also to fostering significant community values. With the backing of our DCCM sister companies, Southstar | DCCM has access to an immense depth of addition resources, allowing us to be trusted partners in progress, ensuring the timely and budget-conscious completion of projects, and making a lasting impact on the communities we serve.
Southstar clients can be assured of the quality and professionalism of Southstar’s growing staff of 25 employees, with extensive in-house resources highly regarded within the infrastructure industry. Southstar project/construction managers and inspectors have assisted over 40 public agencies in the successful delivery of projects of all sizes.
Southstar team members make a difference to clients and the community by continually providing superior service with the highest level of integrity. Providing client-focused services to many state and local agencies in Southern California, Southstar professionals know the critical questions to ask, and the corresponding solutions to offer. By blending innovative problem-solving skills, exceptional depth of experience, and quality supervision and inspection services, Southstar consistently completes the construction of large-scale infrastructure projects on time, within budget, and with no claims. The Southstar team has the ability to resolve challenges by offering their clients innovative solutions that are custom tailored to each project.
OUR SERVICES
• Construction Engineering
Management
• Program/Project Management
• PA/ED and PS&E for water,
wastewater, power, and
transportation projects
• Construction Inspection
• Vertical planning/design and plan
checking
• Urban planning and design
• Community Outreach
• Critical Path Schedule
Development
• Project Budget Development &
Tracking
• Program Planning
• Utility Relocation Management
• Local Agency Coordination
• Traffic Engineering
• Federal Funding Expertise
• Right-of-Way Delivery
• GIS / Survey Mapping
• Labor Compliance
• FAA Section 107 GPS Drone
Photogrammetry
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 2
SUBCONSULTANT
Ninyo & Moore, a California Corporation, is a minority-owned, multidisciplinary consulting firm that provides high-quality geotechnical and environmental consulting services. The firm was established in 1986 to provide consulting services in geotechnical engineering, construction inspection and testing, engineering geology, hydrogeology, hazardous waste remediation and environmental assessment. They are committed to being responsive, thorough, technically sound, and active in the business community. Ninyo & Moore serves its clients through 15 offices in California, Arizona, Nevada, Colorado, Utah, and Texas. The quality of Ninyo & Moore’s personnel base of 600 employees is widely recognized. Their staff of professionals includes experienced and registered geotechnical engineers, civil engineers, environmental engineers, engineering geologists, hydrogeologists, environmental scientists, certified technicians and field inspectors, and hazardous waste and regulatory compliance specialists.
SERVICES
Materials Testing & Geotechnical Services
PRIMARY CONTACT
Garreth Saiki, PE, GE
355 S Grand Avenue, Suite 2450,
Los Angeles, CA 90071
(213) 488-5111
REFERENCES
Agency Contact Project Address Phone
City of Pasadena Tiffany Chen On-Call Geotechnical Consulting and Materials Testing
233 W. Mountain Ave.,
Room 255
Pasadena, CA 91109
626.744.4191
CRTD Hector Davila
On-Call Service Agreement-
Geotechnical Consulting and
Materials Testing and Inspection
2950 Washington Street,
Riverside, CA 92504 909.677.8888
Orange County
Sanitation District William Gilbert
OCSD - On-Call Materials Testing,
Inspection and Other Geotechnical
Testing Services
10844 Ellis Avenue, Fountain
Valley, CA 92708 714.593.7844
exeCutive SuMMARy / SubCoNSultANt
HEADQUARTERS
1945 Chicago Avenue, Suite C-2
Riverside, California 92507
951.342.3120
CONTACT
Yvette Kirrin, PE
President
(626) 644-8058
[email protected]
EXECUTIVE SUMMARY
Our depth of experience working with local agencies and history of successfully delivering projects is highlighted throughout this proposal. This proposal will demonstrate the turn-key benefits of working with a professional construction management, inspection and materials testing team with unparalleled qualifications and experience, especially when it comes to our depth of knowledge regarding Public Works CIP projects in Southern California. Southstar is the team to deliver the quality, responsiveness, innovation, and value that the City expects. Ms. Kirrin will be responsible for coordinating with the City to provide the staff needed for any assignment, and to execute task orders on behalf of Southstar.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 3 oRgANizAtioN CHARt
City of Downey
Resident Engineer
Cyrus Shahinpar, PE, CMQ/OE*
Public Outreach Manager
Vanessa Barrientos*
Construction Inspectors
Sergio Topete*
Jayesh Solanki*
Tyler Garrison (Backup)
Structures Inspector
Ian Tai, PE
Labor Compliance Officer
Ramon Carlos
Materials Testing
Garreth Saiki, PE, GE*
Vance Hunter
Principal-in-Charge
Yvette Kirrin, PE *
Southstar | DCCM
Construction Management & inspection
Team Members Availability
Name Role Availability
Yvette Kirrin, PE*Principal-in-Charge 70%
Cyrus Shahinpar, PE, CMQ/OE*Resident Engineer As-needed Up to 100% Sergio Topete*Construction/Roadway Inspector As-needed Up to 100% Jayesh Solanki*Construction/Roadway Inspector As-needed Up to 100% Vanessa Barrientos*Public Outreach Manager As-needed Up to 100% Ramon Carlos Labor Compliance Officer As-needed Up to 100% Tyler Garrison Construction/Roadway Inspector (Backup)As-needed Up to 100% Ian Tai, PE Structures Inspector As-needed Up to 100%
Garreth Saiki, PE, GE* Materials Testing As-needed Up to 100% Vance Hunter Materials Testing As-needed Up to 100%
Firm Key
* Key Personnel
ORGANIZATION CHART
This organizational chart illustrates our team’s proposed roles, lines of communication and support services. Below is a roster of available staff for the City to select, as needed and specific to any given CIP project. Southstar is happy to meet with the City to determine the unique needs of any given project and provide recommendations from the available roster with regard to both technical expertise and availability as well as cost considerations. We have noted a list of staff that can fill multiple roles. Southstar understands that those designated as key personnel will be available to the extent proposed for the duration of the required services and acknowledges that no person designated as “key” shall be removed or replaced without the prior written concurrence of the City.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 4 Key PeRSoNNel ReSuMeS
FIRM
Southstar | DCCM
EXPERIENCE
15 years with Southstar
30 years in the role
EDUCATION
BS, Mechanical Engineering –
University of Florida
LICENSES/REGISTRATIONS
Professional Civil Engineer, CA
License #C63667
BACKGROUND
Ms. Kirrin has over 30 years of
extensive transportation planning,
design and construction and project
management. Her management
expertise is in the facilitation of large
transportation projects within small
and large governance structures,
as well as an expertise in federal,
state and local funding, including
working with Metro and Caltrans. In
addition to Yvette’s business role with
Southstar, she is a working partner
and has several Project and Program
Manager roles in southern California.
These roles utilize her technical
knowledge to deliver projects, as
well as her strategic thinking in the
political advocacy arena. She has
significant experience working with
diverse stakeholder groups, and she
focuses on equity and inclusion for
the delivery of the best projects.
Yvette’s technical experience includes
the planning, design and construction
of interchanges and freeways,
multimodal complete streets,
including roundabouts, and the
coordination of large projects. Yvette
has been the President of Southstar
Engineering & Consulting, since 2010,
which is a Certified Small Business.
RANDOLPH CORRIDOR ACTIVE TRANSPORTATION PROJECT
CITY OF COMMERCE | COMMERCE, CA
Ms. Kirrin is responsible for managing the completion of the Project that extends along the Randolph Corridor beginning at the eastern terminus in the City of Commerce and extending west along the corridor through the Stakeholder’s westerly corridor terminus; a distance of 6.83 miles. She is overseeing the overall scope, schedule and budget, but also the Metro Funding Agreement requirements, reimbursement, and the balance of equity between the Cities of Commerce, Bell, Huntington Park and the County of LA via the executed Memorandum of Understanding. Ms. Kirrin is managing Phase 1 planning/concept engineering work to be done and based on the elements that the jurisdictions wish to move forward with, these will be basis of Phase 2 environmental work.
Phase 3 will develop the PS&E and bid specifications needed to construct elements that were cleared as part of Phase 2, and that conceptually fit within the budget, as quantified in Phase 1.
CITY OF SANTA FE SPRINGS STAFF AUGMENTATION
CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Ms. Kirrin recently served as the Interim Public Works Director for the City of Santa Fe Springs, where her duties include the management of multiple managers and divisions, coordination with the City Council and the oversight of large-scale subregional projects. She still represents the City as their Project Manager for the Rosecrans/Marquardt Grade Separation Project. Responsible for coordination with Metro, BNSF, other City Staff, and Caltrans in the review of plans, processing of Section 190 invoices, Right of Way vacations, water line relations and flagging.
GATEWAY CITIES COUNCIL OF GOVERNMENTS (GCCOG)
GCCOG | LOS ANGELES COUNTY, CA
Ms. Kirrin serves as a Transportation Engineer and is responsible for the subregional technical review, oversight and program management tasks needed to facilitate Metro Measure R and Measure M funds. Additionally, she is responsible for various portions of the subregional transportation initiatives including the arterial complete streets projects and the active transportation strategic projects for the 27+ Cities/Jurisdictions. This includes the facilitation of over$1 Billion in funds.
Ms. Kirrin is responsible for protecting the interests of the Cities regarding how the funds are allocated and spent, as well as responsible for communicating to the Public Works offices, City Mangers and Elected officials the status on the projects.
More than 50 projects in the subregion have been coordinated and delivered, utilizing Ms. Kirrin’s expertise in the areas of funding, planning, design, right of way, construction and/or construction management and inspection.
SERVING AS PRINCIPAL-IN-CHARGE FOR:
• City of Bellflower On-Call PM, CM & Inspection
• City of La Mirada On- Call CM & I
• City of Commerce – On Call CM & I
• City of Santa Fe Springs – On Call Engineering
YVETTE KIRRIN, PE
PRINCIPAL-IN-CHARGE
Key PeRSoNNel ReSuMeS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 5 FIRM
Southstar | DCCM
EXPERIENCE
22 years in Industry
1 year with DCCM
EDUCATION
MS, Civil Engineering – California
State University, Fullerton
BS, Civil Engineering – California
State University, Fullerton
LICENSES/REGISTRATIONS
Professional Engineer, Civil #C62538
(9/00)
Certified Manager of Quality/
Organizational Excellence, CMQ/OE
(5/2023)
Microsoft Certified Technology
Specialist: MS Office Project 2007,
Managing Projects
NACE Level 1 Certified, #445871
OSHA-10-hour certificate, March 2012
BACKGROUND
Mr. Shahinpar is a top-performing
licensed engineer with over 20 years
of progressive experience and a
strong track record of demonstrable
success in all aspects of project
design and field management. He is
Honest, dependable, and dedicated
self-starter with history of effectively
coordinating and managing onsite
construction activities to consistently
lead projects to completion safely,
on time, and within/under budget,
while maintaining high quality. Mr.
Shahinpar has been the structures
rep on dozens of Southern California
bridge structures, all successfully
completed on-time and within budget.
I-215 HOLLAND ROAD OVERCROSSING
CITY OF MENIFEE | MENIFEE, CA
Mr. Shahinpar is overseeing construction management activities for this project. Project scope consists of constructing roadway approaches and I-215 overcrossing at Holland Road in the City of Menifee. The bridge is a 328 foot, 3-span, cast in place, post tensioned box girder bridge and will provide 2 lanes of traffic, a bicycle path, and sidewalk in each direction. Decorative barrier rail and bridge lighting will match the recently constructed bridges at Newport and Scott Roads. Future utilities will be accommodated with 2- 18” EMWD water lines and 6- 5” SCE conduits within the bridge, and electrical and communication conduits in the sidewalks. Bridge will be founded on 36” Cast in Drilled Hole, (CIDH) piles.
SR 91 REFRESH PROJECT
CLIENT NAME | IRVINE, CA
Mr. Shahinpar provided design oversight and construction management services for the $12.5 million SR 91 Refresh Project for the Riverside County Transportation Commission (RCTC). Improvements include, reconstruction of bridge approach slabs and joint seals, removal and reconstruction of: soundwalls, MSE wall moment slabs and barriers, Lean Concrete Base (LCB) and Joint Planed Concrete Pavement CTPCP) and polyester overlay. Cyros inspected various drainage repair work, aesthetic repair work for existing MSE retaining walls, rock blanket slope protection and miscellaneous electrical improvements. Duties include review of design-builder submittals, Managing the inspection team for both quality control testing and independent quality assurance of construction activities and materials, document control, schedule, and cost control. Managing meetings with Owner, Caltrans and design-builder, as-builts and project closeout.
BRIDGE REPLACEMENT
LA COUNTY DEPARTMENT OF PUBLIC WORKS | SANTA CLARITA, CA While working in Santa Ana for Psomas, he served as a consultant for the LA County Department of Public Works on bridge replacement in the City of Santa Clarita and the TRTP project for Edison in the City of Palmdale. Responsibilities included: Inspected and oversaw bridge construction, ensuring compliance of all procedures and materials with all plans, specifications, and standards. Reviewed working drawings including anchor bolt layouts, fabrication and erection plans, false work, temporary support systems, cast-in-drilled hole pile mitigation and formwork. Recorded and filed documents including daily reports, monthly pay estimates, and job expenditures. Assisted in the preparation of contract change orders (reduced change-order amounts by tens of thousands of dollars through superior negotiations), contract pay estimates, and other documents, such as responses to Construction Contractor’s claims, reports and letters related to the construction of the project. Prepared calculations, records, reports, and correspondence related to project activities, contract change orders, and claims issues. Assisted in the preparation of final as-built plans and reports.
CYRUS SHAHINPAR, PE, CMQ/OE
RESIDENT ENGINEER
Key PeRSoNNel ReSuMeS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 6 FIRM
Southstar | DCCM
EXPERIENCE
6 years with Firm
35 years in Role
EDUCATION
BS, Architectural & Civil Engineering
– National Polytechnic Institute,
Mexico City, Mexico
LICENSES/REGISTRATIONS
Registered Engineer License #
1298788 (Mexico)
BACKGROUND
Mr. Topete has over 35 years of civil
engineering experience, with a career
track focused on City Engineering
Management, planning, organizing,
directing, and reviewing of all
activities and operations of a Public
Works Department. Duties include
reviewing, designing and approving
plans, specifications, estimates and
bids, directing inspection activities,
coordination of assigned activities
with other departments, divisions
and outside agencies, oversight of
the City’s annual street improvement
program, CDBG Projects, SR2S,
Prop. C, STPL and providing highly
complex administrative support to
the Public Works Director. Mr. Topete
has directed and participated in
the construction and inspection of
infrastructure projects, establishing
project schedules, verification of
project status, ensuring compliance
with contract specifications and Local
and National codes. His experience
includes developing and monitoring
contractor pay requests, vendor pay
requests, sub-contractor pay requests
and equipment/manpower reports. He
is also bilingual in English and Spanish.
CIP 2017-03 ATP CYCLE III PROJECT NO. ATPL-5150(015)
CITY OF HUNTINGTON PARK | HUNTINGTON PARK, CA
Mr. Topete performed field inspection of pedestrian safety enhancements at the remaining uncontrolled crosswalk locations in the City. The project included replacement of ADA ramps, remove and replace fire hydrants, install Rectangular Rapid Flashing Beacons (RRFB) with LED lights, updated signing, and pavement markings at uncontrolled crosswalks and will mitigate hazardous conditions while improving pedestrian safety, schools and along: Pacific Blvd, Miles Ave, State St, Gage Ave, Alameda St, Saturn Ave, Zoe Ave and Salt Lake Ave. The project required heavy traffic control and coordination with business owners, schools and residents. Work also included photo documentation, measuring, calculating, and recording all construction quantities for estimates.
STREET IMPROVEMENTS ON GARFIELD AVENUE AND IMPERIAL HIGHWAY CITY OF SOUTH GATE | SOUTH GATE, CA
Mr. Topete performed field inspection of pavement concrete grind asphalt; leveling course; ARHM overlay; demolition and replacement of ADA ramps; construction of medians and walkways with landscape grouted cobble, decomposed granite, boulders, irrigation system; striping; replaced traffic signals; removed and replaced curb & gutters, driveways, cross gutters; and install new controller, removed and replaced electrical pedestal. The project required heavy traffic control and coordination with business owners. Work also included photo documentation, measuring, calculating, and recording all construction quantities for estimates.
BELLFLOWER BOULEVARD WIDENING PROJECT. ARTESIA BOULEVARD TO SR-91 WB RAMP. SPECIFICATION NO. 14/15-09
CITY OF BELLFLOWER | BELLFLOWER, CA
Mr. Topete provided the inspection expertise and services for the widening project at Bellflower Blvd. and Artesia Blvd. Features include wider dedicated right turn lanes for SR-91 freeway access, longer left turn lanes for SR-91 freeway ramp access, newly paved roadway and pavement striping and signs, wider travel lanes, a right turn arrow for southbound right turns from Bellflower Blvd. to Artesia Boulevard, all new traffic signals, traffic signal equipment and fiber optic, new traffic signal timing and crosswalk improvements, new street lights poles and lamps. Coordination with Caltrans was required for the encroachment permit improvements in areas with Caltrans access control.
SERGIO TOPETE
CONSTRUCTION INSPECTOR
Key PeRSoNNel ReSuMeS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 7 FIRM
Southstar | DCCM
EXPERIENCE
2 years with Southstar
35 years in Role
EDUCATION
Associates Degree -
Construction Management (India)
LICENSES/REGISTRATIONS
CTQP
SCDOT
ACI Technician Grade 1, Nuclear
Safety Cert
ATSSA MOT Advanced
PTI Level 1& 2
SCDOT Concrete Levels I and II,
Asphalt Roadway Technician
ACI Concrete Field-Testing Grade 1
BACKGROUND
Mr. Solanki is a Civil Engineer with
over 35 years of experience in
the engineering and construction
industry. He has served in various
roles on roadway and bridge
projects including project manager,
construction manager, and roadway
and segmental bridge inspector.
ON-CALL CONSTRUCTION INSPECTION & ENGINEERING
CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Mr. Solanki provided Construction Inspection services on various task orders for the City of Santa Fe Springs. He has inspected improvements that included:
reconstruction of sidewalks, stamped concrete, curb and gutters; upgrades or additions of ADA ramps; pavement rehabilitation; storm drain reconstruction or rehabilitation; and traffic signal upgrades, landscape and irrigation improvements, bioswale construction, and parking lot resurfacing.
MUNICIPAL SERVICE YARD WAREHOUSE AND ADMINISTRATIVE OFFICE
ROOF REPLACEMENT
CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Mr. Solanki provided Construction Management and Inspection services on this roofing project for the City of Santa Fe Springs. Duties included approval of material submittal, contract Change Orders, Monthly Estimate preparation for City Construction Manager approval and conducted site visit to access contractor’s performance. He also assisted Project Inspector with any site issues resolved site issues in coordination with City PW department, Contractor and the material supplier (To comply with their warranty requirements).
BETTY WILSON CENTER ROOF REPLACEMENT
CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Mr. Solanki provided Construction Management and Inspection services on this roofing project for the City of Santa Fe Springs at the Better Wilson Center. Duties included approval of material submittal, contract Change Orders, Monthly Estimate preparation for City Construction Manager approval and conducted site visit to access contractor’s performance. He also assisted Project Inspector with any site issues resolved site issues in coordination with City PW department, Contractor and the material supplier (To comply with their warranty requirements).
RESIDENTIAL STREET IMPROVEMENTS SOUTH OF FLORENCE AVE.
(TRIANGLE) LONGWORTH AVE. (ORR AND DAY ROAD TO HARVEST AVE.) CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Mr. Solanki provided Construction Management of this street improvement project for the City of Santa Fe Springs on this project that improved residential streets. Duties included material submittal approval, Asphalt mix analysis with FRAC. The project was constructed using Greenbook 2018 standards. He was responsible for coordinating phased construction with City Managers, Inspector and Contractor and approval of the monthly estimates including final payment.
During the project he kept track of the contract items quantity changes and negotiate change orders with contractor.
JAYESH SOLANKI
CONSTRUCTION INSPECTOR
Key PeRSoNNel ReSuMeS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 8 FIRM
Southstar | DCCM
EXPERIENCE
9 years with Southstar
14 years in the role
EDUCATION
BS, Criminal Justice – California State
University, San Bernardino
AWARDS
ASCE OC Branch Awards |
Construction Project of the Year
Gold Award, MarCom Awards |
Communication Program
Finalist, Public Relations Society
of America, 50th Prism Awards,
Community Relations
BACKGROUND
Vanessa Barrientos has over 12
years of develop and execute
tailored public awareness campaigns
for over$3.4 billion high-profile
infrastructure projects with a cost-
effective approach by establishing
goals, objectives and budgets. She
encourages open conversation and
facilitating the access of project
information. Top priorities are safety
and engaging the community in an
open conversation and facilitating
the access of project information. Her
unique approach to public outreach
strains from her experience as a
Caltrans Traffic Management Center
Liaison, Assistant Project Manager
for Caltrans Stream-Lined Oversight
Projects, and as an Office Engineer.
These assignments enhanced her
communication skills – affording her
the capability of communicating with
Engineers - turn around and decode
technical project information to the
general public for continuous support
throughout the life of the project.
ON-CALL PUBLIC OUTREACH TASK ORDERS
CITY OF SANTA FE SPRINGS | SANTA FE SPRINGS, CA
Ms. Barrientos has been providing public outreach services for various improvements projects throughout the City. Her responsibilities include as- needed tailored public awareness plans for improvement projects including, construction alerts, oral translation, writing translation, neighborhood meetings, meeting invites, attending construction meeting, TMP planning meetings and door to door communication. She also assists in the review/implementation of the Transportation Management Plans (TMPs) for the projects. She provides extensive coordination with multiple Resident Engineers (RE), Local Agencies (3), local Emergency Services, Joint Power Authority (JPA), School District Transportation, Transit Buses, Metro, Utility Agencies and local businesses.
Task orders included:
I-5 Florence Avenue Interchange Project – Construction, I-5 Florence Avenue Santa Fe High School Bus – Construction, Florence Avenue Widening Project – Design, I-5 Valley View Avenue Grade Separation Project – Design and Construction, and Barkley and Parkmead Street Improvement Project - Construction
I-15 / CAJALCO ROAD INTERCHANGE PROJECT
CITY OF CORONA | CORONA, CA
Ms. Barrientos served as a Dedicated Community Liaison and was responsible for developing and executing a comprehensive bilingual community outreach plan for this complicated highway project. She coordinated resident engineer, contractor, I-15 Express Lanes Project, EVMWD’s Flager Wells Project, Temescal Canyon Widening Project, City Water Main Project, Arantine Hills Development Roadway Project, local businesses and residents. Her outreach plan included a dedicated project website, business outreach, resident outreach, City Council briefing presentations, branding and collateral material design, toll-free hotline number management, graphic design, photography, translation services, and construction alerts. She maintains a comprehensive documentation control system, detailing public inquiries, photos, and outreach activities.
I-5 NORTH SEGMENT FROM SR-134 TO KERN COUNTY LINE
CALTRANS DISTRICT 7 | KERN COUNTY, CA
Ms. Barrientos served as a Community Outreach Coordinator for this$1.3B project as part of the Caltrans District 7 On-call Public Awareness contract.
Her responsibilities included executing an extensive community outreach plan, coordinating staff and subconsultant tasks, reviewing invoices, and providing client relations. Vanessa’s outreach plan included developing a project website, event planning, business and resident outreach, chamber of commerce outreach, neighborhood association presentations/outreach, branding, collateral material design and distribution, coordination of the toll-free hotline process and staff, presentations, design and distribution of construction notices, graphics, photography, translation services, presentation boards, design and distribution of corridor brochures, closures list, and other construction activities.
VANESSA BARRIENTOS
PUBLIC OUTREACH COORDINATOR
Key PeRSoNNel ReSuMeS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 9 1Garreth M. Saiki, PE, GE | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants
EDUCATION
MBA, 1998, University of California Davis
M.S., Geotechnical Engineering, 1989,
University of California Berkeley
B.S., Civil Engineering, 1987, University of
California Berkeley
REGISTRATIONS/
CERTIFICATIONS
PE 49665 (California)
GE 2509 (California)
Nuclear Gauge Operator Certification
PROFESSIONAL
AFFILIATIONS
American Society of Civil Engineers
Garreth Saiki, PE, GE
Principal Engineer
As a Principal Engineer for Ninyo & Moore, Mr. Saiki coordinates and conducts geotechnical evaluations public facilities, including highways, railroads, airports, pipelines, public and private buildings, and bridges; performs slope stability analyses, flexible and rigid pavement design, and underground pipeline design; prepares and reviews geotechnical reports; and provides geotechnical design parameters and recommendations for shallow and deep foundations, retaining structures, in-situ ground remediation and earthwork; reviews laboratory results, project plans and specifications; Mr. Saiki also provides project coordination and oversees scheduling of field activities, supervises staff-level geologists and engineers, supervises field technicians and special inspectors, reviews project plans and specifications, and reviews laboratory test results for conformance with the project documents, including the Uni-form Building Code (UBC), California Building Code (CBC), Federal Aviation Administration (FAA), State Department of Transportation (Caltrans), American Association of State Highway and Transportation Officials (AASHTO), and the Standard Specifications for Public Works Construction (Greenbook).
EXPERIENCE
City of Los Angeles, On-Call Geotechnical and Environmental Consulting Services: Project Manager retained for the on-call geotechnical and environmental services contract with the City of Los Angeles Bureau of Engineering, Geotechnical Division. Services include geotechnical design, environmental hazardous materials evaluation, and geotechnical construction support services for various capital improvements throughout Los Angeles.
City of Long Beach, As-Needed Geotechnical and Materials Testing/Inspection and Environmental Monitoring Services, Long Beach, California: Served as Principal Engineer and provided oversight for as-needed geotechnical engineering and construction observation, materials testing and inspection services in support of various city projects.
City of La Mirada On-Call Materials Testing, La Mirada, California: Project Manager retained to provide certified materials testing laboratory and inspection services for various projects within the City of La Mirada, California. The project includes geotechnical services including sampling, material testing, compaction testing, and other services requested. Responsibilities include project coordination and client liaison, on-site soil and materials testing and inspection during construction, field observation, documentation and testing, field sampling and in-place density testing, field sampling and testing of concrete structures and paving during construction and field inspection of the construction materials.
County of Los Angeles, Department of Public Works, As-Needed Geotechnical, Soils and Materials Testing & Inspection Services, Los Angeles, California:
Pricnipal Engineer retained to provide services to the County of Los Angeles, Department of Public Works ranging from geotechnical design, geotechnical testing and inspection to special inspection services for welding, fireproofing, and reinforced concrete and masonry. Mr. Saiki has also worked with the Public Works coordination staff in controlling each projects budget from a geotechnical, materials testing, and inspection services point of view. Ninyo & Moore has provided services on various types of projects from pipeline interior documentation to entire new building design and construction.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 10 ReFeReNCeS ANd RelevANt PRojeCtS
Southstar Engineering has been providing project management, construction management and public outreach services on various Capital Improvement Projects for the City of Santa Fe Springs. Southstar has been responsible for delivering over 60 task orders since 2018.
Some notable completed task orders include: Santa Fe Road Improvement Project • Painter Road Improvement Project • Santa Fe Springs Slurry Seal Program • City Hall Parking Lot Improvements • Whittier Water Main Connection • Florence Avenue Water Main Relocation Phase 1 and 2 • Florence Avenue Widening • I-5 Florence Avenue Interchange Project • Valley View Grade Separation Project, E-76 Submittal • City-Wide Street Light Inventory • Fire Station HQ Roof Replacement • North Wing City Hall Renovation Project • Santa Fe Springs Aquatic Center Renovation Project
CONTACTS
Robert Garcia
Assistant Public Works Director
562.447.0701
[email protected]
Noe Negrete
Former Public Works Director
562.450.4159
[email protected]
CONTACT
Len Gorecki
Public Works Director
562.804.1424
[email protected]
The Southstar team provided construction management and inspection services for various improvements projects throughout the City of Bellflower. Inspection services provided include the observation of the placement of concrete sidewalk around the pull box on Bellflower Blvd. and Artesia Blvd., wire connections on the control panel, excavation and leveling of ADA ramps, and the placement of concrete into ADA ramps. Southstar has been responsible for delivering two (2) task orders.
ON-CALL CONSTRUCTION INSPECTION & ENGINEERING
City oF SANtA Fe SPRiNgS | SANtA Fe SPRiNgS, CAliFoRNiA
ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION
City oF bellFloWeR | bellFloWeR, CAliFoRNiA
ReFeReNCeS ANd RelevANt PRojeCtS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 11 Southstar has been providing the County of Riverside Transportation Department (CRTD) with construction inspection and management services on an on-call basis since 2018 and is expected to continue doing so into the foreseeable future. These services have been performed in accordance with the Caltrans Local Assistance Procedures Manual, applicable federal requirements and the County of Riverside’s Quality Assurance Plan. Southstar has been responsible for delivering ten (10) task orders.
Southstar provided construction management and inspection services for this project This project will create a system of complete streets boulevards on east/west connector streets, along with one north/south boulevard. The complete streets boulevards will include Class III bicycle routes, sharrows, signage, bike boxes, and curb bulbouts. These will be complemented with pedestrian safety and mobility enhancements, including pedestrian ramp improvements, wayfinding signs, and continental crosswalks. The boulevards are located along the length of Gage Avenue, Saturn Avenue, Florence Avenue and Miles Avenue. The pedestrian focus area is on Pacific Boulevard, Santa Fe Avenue and Florence Avenue. The project required heavy traffic control and coordination with business owners, schools and residents. Work also included photo documentation, measuring, calculating, and recording all construction quantities for estimates.
ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION CouNty oF RiveRSide tRANSPoRtAtioN dePARtMeNt | RiveRSide CouNty, CAliFoRNiA CIP 2018-11 ATP CYCLE IV PROJECT NO. ATPL -5150(014)
City oF HuNtiNgtoN PARK |HuNtiNgtoN PARK, CAliFoRNiA
CONTACT
Hector Davila
Construction Manager
562.868.0511
[email protected]
CONTACT
Steve Foster
Public works Director (Interim)
323.584.6320
[email protected]
ReFeReNCeS ANd RelevANt PRojeCtS
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 12 Southstar provided construction management and inspection services for various improvements projects for the ambitious, five-year, multi-million-dollar infrastructure improvement plan to include numerous reconstruction, repair, and replacement projects throughout the City. Services included monitoring construction for compliance with Greenbook Standards, Caltrans Standards, State Water Resources Board, South Coast Air Quality Management District, Southern California Edison, the plans and specifications, and/or other jurisdictional agencies. Southstar was also responsible for confirming the limits and overseeing the repair and replacement of deteriorated asphalt surfaces, including removal and placement of full structural sections, grind and overlay, and slurry sealing of roadways. Southstar has been responsible for delivering four (4) task orders.
ON-CALL CONSTRUCTION MANAGEMENT, INSPECTION, AND ENGINEERING City oF lA MiRAdA | lA MiRAdA, CAliFoRNiA
CONTACT
Mark Stowell
Public Works Director/City Engineer
562.902.2385
[email protected]
UNDERSTANDING
Southstar understands that the City of Downey (City) is requesting Statements of Qualifications (SOQs) from
interested Civil Engineering Consulting firms to provide “On- Call” Public Works construction management, inspection
and materials testing services for a three-year period, with optional three additional one-year periods, for small to large size projects and tasks.
The City is soliciting the services of a consultant which shall provide at least one on-call construction manager, at least two on-call inspectors and materials testing services to function in two separate sections of the Engineering Division of the Public Works Department. Southstar has a pool of experienced Construction Managers and Inspectors that can step in to lead any assigned project, but to ensure a consistent point of contact, Ms. Yvette Kirrin will serve as the Principal-in-Charge. Ms. Kirrin will meet with the City to discuss staffing needs for each task order or project and propose a list of suitable staff members for each task and allow the City to select their preferred candidates. All our staff members will be made available for in-person
interviews prior to selection if the City prefers.
We understand that the process does not guarantee
contracts with the City but will result in a “pre-qualified” list of firms that may be utilized for future projects or tasks and that proposals for individual projects or tasks will be solicited on a project-by-project basis through an RFP process
from those firms which are deemed “pre-qualified”. The
approved list of consultants will remain valid through June 30, 2026, subject to the three individual one-year extensions at the City’s discretion.
Southstar is prepared to provide construction management, inspection, materials testing, public outreach and labor compliance services as outlined in the Scope of Services section of the RFP. These services will be under the direction of the Engineering Division of the Public Works Department.
We have reviewed the Capital Project section of the City’s FY 2023-2024 CIP listed on the City’s website and understand that it appropriates $98,317,000 for street, sewer, light, storm water, water, traffic and public facility improvements. These Capital improvements are required to maintain the City’s physical infrastructure. Southstar understands that even though the Proposed CIP addresses primary infrastructure needs, a significant infrastructure maintenance backlog may remain and Southstar is prepared to provide services to address this issue as well. Southstar can help the City target resources toward their most important need and seek all possible avenues to secure federal, State, and regional funding to supplement available City funding.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 13 PRojeCt MANAgeMeNt
TIME METHODOLOGY
Southstar brings extensive expertise in managing on-call contracts, supported by a robust project management
approach tailored to meet the specific demands of this
contract. Our team possesses a strong Project Management skillset essential for effective project execution. We are dedicated to ensuring that ample time is allocated to
inspection and construction management services while
seamlessly integrating them with our office workload.
To facilitate efficient project management, we employ
various communication channels, including email and phone, to maintain clear and constant communication with the City of Downey. Moreover, we utilize Microsoft Project and the suite of Microsoft 365 products for project management
and information dissemination to the City. We extend this management approach to our subconsultant resources,
ensuring streamlined coordination and collaboration across all project elements.
The City of Downey will benefit from the flexibility to select Southstar professionals based on their project requirements, enabling efficient resource allocation and access to a
diverse pool of candidates throughout the contract duration.
Recognizing the dynamic nature of work under this
agreement, we remain adaptable and will adjust staffing levels as needed to meet the City’s evolving needs while upholding our commitment to delivering high-quality service.
Our proven track record of securing repeat business
underscores our ability to effectively balance resources and consistently deliver exceptional results within designated timelines.
This flowchart illustrates the typical task order process for similar on-call contracts, providing a visual representation of our streamlined approach to project management and
service delivery.
For the City of Santa Fe Springs, Southstar consistently delivers exceptional service through our team of cross- trained staff members who have collectively managed
over 60 task orders, each differing in scope, schedule, and budget. Presently, on Task Order 67, we continue
to uphold our reputation for meeting schedules and
exceeding expectations. See Additional Information for
Santa Fe Springs Sample Task Orders.
Our track record of success is exemplified by a selection of task orders showcased in the table below. These projects closely align with the scope of services requested by the City of Downey, demonstrating our expertise in handling similar types of projects with precision and efficiency.
By leveraging our extensive experience and proven
capabilities, Southstar is uniquely positioned to support the City of Downey’s needs and deliver outstanding results on their on-call contract.
Project Planning
Agency Identifies
Need
Project Review/
Staffing Evaluation
-Staffing Qualifications
-Availability
-Team Assignment
-Communication/
Understanding
-Project Goals
Scope Agreement
and Cost Proposal
Kickoff
Meeting
Develop
Workplan
Execute
Task Order
Performance
Perform
Work
Monitor
Progress
-Team Continuity
-Communication -Project Controls -Meeting Deliverables
-Milestone Schedules
Quality
Control Deliverables Complete
Task Order
PRojeCt MANAgeMeNt
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 14
APPROACH
Southstar follows a comprehensive methodology consist-
ing of dozens of time-tested and proven strategies for en- suring contractors working on public works capital projects for municipal agencies stay on schedule and under budget.
The following subsection lays out Southstar’s Ap-
proach and Work Plan to the City’s CIP Projects specific to CM&I services. Additionally, this proposal also includes Public Outreach Services, which we feel is an integral task needed for the success of any project, via the coordination that is provided via informational releases from the City as well as keeping City management, leadership and Council members informed, with attention to detail in the commu- nity, minimizing issues being elevated within the City.
Ms. Kirrin, will be responsible for coordinating with the City to provide the staff needed for any assignment, and to execute task orders on behalf of Southstar. All services shall be in accordance with local guidelines as described in Chapter 16, “Administer Construction Contracts” of the Caltrans Local Assistance Procedures Manual, the Caltrans Construction Manual, and the Caltrans Construction Man- ual Supplement for Local Agency Resident Engineer, and
the Greenbook.
tASK 1 PRojeCt RevieW ANd PlAN CHeCK
PRE-CONSTRUCTION
CONSTRUCTABILITY REVIEW
Prior to project advertisement, Southstar conducts a
thorough review of contract documents (PS&E) for
constructability and biddability. This includes site visits, conflict assessments, staging analysis, impact assessments, plan check coordination, design discipline alignment, unit price verification, permit requirements evaluation, and discrepancy identification for the City Project Manager and Design Engineer. Southstar will provide constructability review of 65%, 95% and 100% design PS&E submittals.
VALUE ENGINEERING
Southstar employs Value Engineering (VE) throughout
the project lifecycle to enhance cost-effectiveness and maintain structural integrity. This approach minimizes costs and reduces waste by providing a clear project overview, facilitating the elimination of redundancies, and ensuring optimal material allocation.
ENGINEERING ESTIMATES
Southstar rigorously reviews Engineer’s estimates to
prevent project delays due to underestimation or inefficient fund allocation, and to track project budget and activities.
PROJECT COORDINATION
STAKEHOLDER COMMUNICATION
Effective communication with Project stakeholders,
including local residents, businesses, utility owners, and agencies, is crucial. A project-specific Public Outreach plan developed by Vanessa will ensure transparent
communication. Additionally, our team will create a project- specific communication plan for stakeholders and the City.
MASTER PROJECT SCHEDULE
Southstar’s Resident Engineer (RE) scrutinizes the
contractor’s baseline schedule for practicality and
comprehensiveness. Monthly schedule updates are closely monitored, and a 3-week look-ahead schedule is used to
manage project progress efficiently. A parallel (as-built) schedule is maintained, and Time Impact Analysis (TIA) is conducted when required.
CONTRACT BIDDING SUPPORT
Southstar administers and advertises construction bids, prepares for pre-bid meetings, manages inquiries, and
coordinates responses with the City’s Design Consultant.
REVIEW AND EVALUATION OF BIDS
Southstar assists the City in reviewing and evaluating
bids, ensuring compliance with contract terms, and
recommending successful low bidders. Notice of Award,
Agreements, and Purchase Orders are processed.
PROJECT MANAGEMENT
Southstar utilizes effective project control tools and
procedures, closely collaborating with the contractor and City staff to ensure compliance with contract documents, efficient payment processes, and timely issue resolution.
Proposed modifications or deviations are reviewed and
addressed promptly.
SCHEDULE CONTROL
Schedule control encompasses baseline construction
schedule submission, approval, and updates. Discrepancies between planned and actual activities will be addressed.
Weekly 2-4-week look-ahead schedules will aid inspection and off-site planning. We closely monitor procurement of long lead materials and alert the City to any construction changes that might impact schedules or costs.
MONTHLY ACTIVITY SUMMARY REPORT
The Southstar Inspector will provide monthly project
status reports. These reports will cover budget, schedule, accomplishments, submittals, change orders, and current and anticipated work progress.
PRojeCt MANAgeMeNt
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 15
REQUESTS FOR INFORMATION
The Southstar team will respond to Contractor’s RFIs
or route them to design engineers as needed. A weekly
tracking report will be maintained and discussed in the weekly progress meeting for efficient issue resolution.
SUBMITTAL MANAGEMENT AND REVIEW
Our team will receive and log all Contractor’s submittals.
Depending on the type of submittal, it will be routed for review by the relevant team member. Responses will be
documented in the submittal log, ensuring the Contractor has the necessary information for project progress.
TECHNICAL AND ADMINISTRATIVE MANAGEMENT
Southstar will provide technical and administrative
management services, oversee project activities, maintain close communication with the Client’s Project Manager
and Design Engineer, and ensure comprehensive
documentation.
PROJECT FILE MANAGEMENT
We will process and track project files at the job site using the agency’s filing system. We can use the Caltrans Uniform Filing System which includes up to 63 potential categories, depending on the need and complexity of the project.
CHANGE ORDERS
Change Orders can be requested by the Contractor due
to field conflicts or initiated by the City for scope changes.
Our team assesses merit, scope, estimated cost, and
schedule impacts, providing City recommendations. We also negotiate change orders if required due to scope changes by the City. We aim to avoid unnecessary change orders and consult with the City when necessary. Payment for change orders follows a clear process.
COST CONTROL SYSTEM
Detecting and addressing construction issues early is the responsibility of all team members, especially field inspectors.
Monthly progress payments are prepared for City review, covering work completed by the Contractor. Change order administration is essential for cost and schedule control. We excel in resolving issues at the lowest level and maintaining detailed project documentation to mitigate claims.
CLAIMS
Our team focuses on strong communication and relationships to minimize the need for contractor claims. In unavoidable cases, we access expert resources to minimize impacts.
REVIEW TRAFFIC CONTROL PLANS
We review Contractor-submitted traffic control plans for safety and access. Recommendations are discussed with
the City before sharing with the Contractor. Ongoing
monitoring ensures compliance.
PROJECT SCHEDULE
We review and approve the Contractor’s schedule, utilizing software tools. Monthly reviews against the baseline
schedule help identify and mitigate potential delays.
DOCUMENT CONTROL
We follow a compliant filing and document control system, documenting all communication and maintaining compliance with Caltrans and City requirements.
SITE SAFETY
Nothing is more important than the safety of the
construction team and the general public. We ensure safety compliance through plan review, monitoring, and reporting of deficiencies. Weekly safety meetings are conducted.
DRAINAGE
We inspect the construct/modify of drainage systems
per requirements, standards, and contract documents.
Proposed modifications or deviations are reviewed and
addressed promptly.
CONTRACTOR PROGRESS PAYMENTS
We administer progress payments based on field
measurements and quantities, subject to City approval.
QUALITY ASSURANCE/CONTROL
Southstar ensures that only quality work will be performed by the team. Southstar’s Quality Control starts with hiring and selecting highly experienced and qualified staff for construction management and inspection. Careful inspection prevents re-work, thereby assisting with meeting both
schedule and budget. Southstar independently performs
quality assurance (QA) reviews of the Project documents and all its files to ensure that the team is accurately documenting the work and have all of the quality processes in place including test results, daily reports and back-up for estimates and monthly progress payments to the
Contractor. Standards of quality are thoroughly discussed, including the expectations of the City and the requirements of the project’s Plans, Specifications and other City
requirements. Proper inspection will yield expected quality of materials and workmanship along with the proper testing of the materials both prior to and after entering the work.
PRojeCt MANAgeMeNt
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 16
LABOR COMPLIANCE
Southstar’s labor compliance officer, Mr. Ramon Carlos, offers over 16 years of experience in construction labor compliance regulation, record keeping and submission
requirements, with labor code requirements on public works projects. He will verify labor compliance through review of the contractor’s certified payrolls, including fringe benefit statements, in accordance with prevailing wage rates set by the California Labor Code and Federal guidelines for reporting of federalized projects. Labor compliance review also includes verification of DBE utilization, subcontractor utilization, and compliance interviews with workers.
tASK 2 CoNStRuCtioN obSeRvAtioN
CONSTRUCTION
DAILY REPORTS
The Southstar Inspector provides daily diaries of
construction progress in Caltrans format from the Caltrans Local Assistance Procedures Manual. These reports cover material quantities, construction progress photos, daily issues, accomplishments, project budget and schedule
status, and other relevant details.
CONSTRUCTION OBSERVATION AND INSPECTION
Field Inspectors play a vital role in quality control on construction projects, ensuring contractor compliance with plans and specifications. Proper documentation is essential for accurate measurement and payment records. Our team
consists of seasoned construction management and inspection personnel with extensive experience in various project types.
Our inspectors offer cross-training in building and facility improvements, electrical and lighting enhancements,
landscaping, sewage, storm drainage, and traffic signal improvements. They have conducted inspection services for storm drain and pipeline relocation, street improvements, roadway widening, striping, traffic control, utility protection, and concrete work. They are well-versed in Caltrans Standard Specifications, Caltrans Standard Plans, the “Greenbook,” CalOSHA, and traffic control practices as specified in the Work Area Traffic Control Handbook (WATCH).
Inspectors ensure the presence of appropriate agencies
(City, environmental, and local) as required and promptly notify the City of any directives, recommendations, or
notices from other agencies. In the field, the Southstar team diligently safeguards the City against defects
and deficiencies in the contractor’s work. Inspection
Responsibilities of the construction inspectors include, but are not limited to:
–Performing daily on-site observations of the progress
and quality of construction to determine if work being
performed is in general conformance with contract
documents, all applicable laws, codes, and ordinances.
–Identifying actual and potential problems associated with Project and recommending sound engineering solutions
–Reviewing plans, specification, and other contract and construction-related documents. Inspectors will intimately study these documents along with traffic control
plans, construction schedules, sequences, and permit
requirements. Understanding all the details of these
resources will guide the inspectors when ensuring the
contractor’s compliance.
–Maintain photographs of the pre-construction,
construction, and the post-construction phases.
–Attend pre-construction meetings, weekly and monthly (if necessary) meetings, and discuss any concerns that may
lead to budget or scheduling issues. Inspectors will create and submit a “Weekly Statement of Calendar/Working
Days” as requested by the City.
–Coordinate with Contractor to discuss plans, specs, and regulations to ensure the contractor compliance.
–Provide inspections to ensure encroachment permittees
about non-compliance and correct compliance problems
as they arise. Inspector will then notify the encroachment permittees when these problems arise.
–The field inspector’s daily diaries will contain full
documentation and photographs of the work
performed. Consistent and accurate written and photo
documentation of all field activities is of paramount
importance in protecting the agency against contractor
claims and costly contract change orders. Per the City’s request, the daily diaries will include site and weather conditions; traffic control measures taken by contractors; labor, equipment and materials used; quantity of work
performed; and major incidents/safety violations.
–Consistently review construction progress schedules
to verify the project is on track and within budget. The inspectors will notify the Contractor should any deviations occur, and they will formulate a plan to bring the project back on track.
–Monitoring the contractor’s daily work for safety, quality, public convenience, and compliance with contract
documents.
–Coordination with the Materials Testing unit to review soil compaction and materials testing certifications of compliance. The Inspector will also coordinate with the City’s Acceptance Testing and Independent Assurance
Program firms to ensure the quality of work once
completed. Monitoring of change order work.
PRojeCt MANAgeMeNt
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 17 – Monitor contractors to ensure materials aren’t installed without the approval of the City’s Material Testing firm. – Monitor utility relocation, minimize utility conflict delays, and potent relocations. Inspectors will report any potential delays or relocations to the agency.
– Coordinate with the Contractor and Public Outreach
Liaison to discuss access to surrounding businesses and residential areas.
– Ensure safety compliance in the field, for the surrounding public, and report any failing safety measures to the City.
PUBLIC OUTREACH (BILINGUAL)
Our team has extensive experience in community outreach and public education programs. Our team, led by Vanessa Barrientos who is bilingual, will provide support for community outreach and public meetings related to the projects. Our team will ensure that accurate information about the projects reaches residents, businesses and the community in a
timely, cost-effective manner. Communication platforms are designed to meet the specific requirements of communities and businesses. Our aim is to minimize inconvenience to the community and traveling public, who play an important role in the success of all projects. Ms. Barrientos’s ability to communicate about design, and engineers an asset throughout the life of the contract.
tASK 3 MAteRiAlS teStiNg
Southstar will coordinate with our Materials Testing
subconsultant, Ninyo & Moore, to provide quality assurance material sampling and testing services to support the
project as needed. Ninyo & Moore will utilize the project management style and approach that we have successfully developed for the past and current on-call contracts with public agencies. Throughout the contract duration, our
proposed project manager and single point of contact for the City and/or Client, will meet with the representative(s) of the City and/or Client to discuss task order assignments and the anticipated services required for those projects. Upon notification of a task order request, we will commence our services. Our approach to on-call geotechnical, inspection and testing services is described below:
DEVELOP SCOPE OF WORK
The initial step in our approach is to meet with the City Project manager in order to get clear understanding of
the project and our expected services. We will review the approved plans and specifications and will develop a detailed scope of services indicating anticipated man-hours by
discipline for the required materials testing and inspection services. We will submit this plan to the City Project
Manager for approval.
PROJECT PERSONNEL UTILIZATION
Upon approval of our scope of work, we will assign the
appropriately certified personnel to the project based on the specific needs of the project. We will also review the contractor’s schedule in order to plan accordingly and
anticipate the future inspections and testing requests.
SAMPLING PROTOCOL AND DOCUMENT CONTROL
We will next establish the sampling protocols required
for the project, based on the project specifications and the requirements of the City Building Code, and other
governing specifications. Our document control system
provides unique identification of daily reports and laboratory conformance testing for each project assignment. These
systems are a part of our Quality Systems Program and will be utilized for each task order assignment.
ESTABLISH COMMUNICATION LINES
The next step in our approach is to establish the
communication lines for the project, including the authorized city representative who will be requesting our services.
We will also request the approved distribution list for our inspection reports, daily field reports, and laboratory conformance test results. On some of the past projects, the City Project Managers have coordinated our services in the field and distributed our reports. On some other past projects, we had been scheduled by the on-site
Southstar Engineering &
Consulting, Inc. has provided
construction management and
public outreach services to the
City of Palm Desert for three
high-profile community projects
since 2019. The Southstar
team we have worked with are
professional, and they make
us feel like their number one
client.
Randy Bowman - Program Manager -Transportation
Coachella Valley Association of Governments
PRojeCt MANAgeMeNt
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 18 City Inspectors and we had distributed our reports to the approved distribution list. We will provide our services to meet the City’s need. Often we will attend the pre-
construction meeting with the contractor and will obtain from the City the approved distribution list for our materials testing and inspection reports as well as our laboratory conformance testing results. We will also provide the city representatives our personnel’s Nextel direct connect
numbers as well as the mobile telephone numbers, and
e-mail addresses for communication during the project. We will also establish the communication lines between the City Project Manager, City Inspector, and the contractors’ and sub-contractors’ representatives.
UTILIZE OUR PROJECT CONTROLS
Ninyo & Moore utilizes an internal project control system that includes budget, schedule, and document review
and control. Our project manager will utilize our in-house system to keep the City Project Manager informed about
the status of our services. We include monthly progress reports indicating the amount billed to date along with a comparison to the overall task order budget and the over all construction schedule. Our quality control includes review of our laboratory conformance test results by a California licensed engineer.
PERFORM FIELD AND LABORATORY TESTING
When construction commences, we will provide the
necessary personnel and equipment to inspect and
test the construction materials quality and contractor’s construction methods in order to document conformance
to the project plans and specifications. We will also
sample the construction materials as required and perform laboratory conformance tests as specified. The results
of our inspections and tests will be forwarded to the City representatives at the end of each working day. Immediate notification will be provided via phone, e-mail, and/or fax if we find non-conformance in materials or workmanship.
FOR FEDERALLY FUNDED PROJECTS
We will perform our materials testing services in accordance with the Caltrans Local Assistance Procedure Manual
(LAPM). We will utilize Caltrans certified personnel and Caltrans certified testing equipment. Our laboratory testing will be performed in our Caltrans certified laboratory. Our test frequencies will be in accordance with the LAPM and/or City approved QAP. Test data and daily reports will be on Caltrans forms.
QUALITY ASSURANCE REVIEW
We understand the importance of reliability of our inspections and test results. Therefore, we have a Quality Assurance Plan in place that provides written procedures for our services.
Our Quality plan is overseen by a California licensed Quality Engineer and include review of our training procedures, as well as participation in third party review and inspection of our facilities. All of our laboratory conformance tests are reviewed by a California licensed engineer prior to submittal.
REPORTS
Written reports are required for project documentation.
We will submit our written reports as established in
the communications structure for the project that was
determined during the project initiation stage. Passing tests and inspections will be filed in accordance with the document control system. Non-conforming reports will be maintained in a non-conformance log that will be maintained by our office. Non-conformance areas will need to be
remedied in accordance with the project requirements.
When non-conforming materials or workmanship are
remedied, we will document the acceptance in the non-
conformance log for project close out purposes.
PROJECT CLOSE OUT
The final step in our approach is the closing out of the project and providing the project documentation, as it relates to materials testing and inspection, to the City. As indicated above, Caltrans test data sheets and daily report forms will be used as appropriate.
tASK 4 utility ANd outSide AgeNCy
CooRdiNAtioN
Project Manager, Ms. Yvette Kirrin, PE, will lead this task and Vanessa Barrientos will be responsible for alerting all affected utility companies, school administrators, Water District, Police Department, Fire Department, Trash
Services, and Public Transportation Agency for the pre- construction meeting and during construction. Our team
will review the scope of work with each utility company at the pre-construction meeting, review possible conflicts, and work with each utility to ensure that specific needs of the project are understood. Southstar will coordinate with utility companies to expedite identification of any unknown utilities found during exaction, and will coordinate any relocation work by utility companies after notifying the City.
tASK 5 PRojeCt CloSeout
POST-CONSTRUCTION
AS-BUILT DRAWINGS
The Southstar team maintains a red-lined set of “As-Built” plans in the construction field office, documenting as-built conditions. These drawings are reviewed at the end of
construction to ensure accurate documentation of plan
changes. Following the review, they are transmitted to the designer for electronic plan set updates, including the City’s signature, and archival storage.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 19 PRojeCt MANAgeMeNt / otHeR iNFoRMAtioN
FINAL WALKTHROUGH
Southstar conducts final inspections, monitors punch-list completion, and issues a notice of substantial completion.
A final walkthrough is scheduled and conducted with the City, Caltrans, contractors, and design engineers. Southstar coordinates any required corrections resulting from the walkthrough. Once all corrections are addressed, final
project acceptance is coordinated with the City and relevant agencies and utilities.
FINALIZED DOCUMENTS
All project items, including record drawings, contract bid items, claims, change orders, and punch-list items, are finalized.
ITEM CLOSEOUT
All open contract items are closed out and balanced,
addressing item overruns and underruns. Contract Change Orders are created if necessary to adjust item prices.
PROPOSED FINAL ESTIMATE
Depending on project complexity, the Southstar Inspector can lead or assist in preparing the Proposed Final Estimate and obtain Contractor’s concurrence. This document is
provided after resolving any open claims.
CLAIMS REPORT
The team focuses on problem-solving and documentation
to avoid contractor claims. In case claims are unavoidable, Southstar can tap into expert resources to minimize impacts on project cost and schedule. The Resident Engineer
prepares a Claims Report for outstanding and unresolved claims, following Caltrans Construction Manual guidelines.
PROJECT REPORT
A Final Project Report is created, detailing project
construction, final construction cost (including
management and administration), Contract Change Orders, Construction Claims, and their resolutions, along with
photo and video documentation.
ELECTRONIC FILES
Project files, including drawings, are transmitted to the City in PDF format. Hardcopy project files are organized, labeled, and prepared for storage.
StReNgtH ANd StAbility
Southstar | DCCM’s strength and stability is demonstrated by a nearly $30 Million capacity within our existing On-call contracts and our ability to be responsive to Client needs.
Additionally, last month, Southstar was acquired by DCCM and will be able to provide additional depth of resources, while still providing the familiar faces that you know and trust. We fully expect that the Southstar | DCCM union will provide increased strength and stability to all our clients in Southern California.
REMAINING
FUNDS
BILLED TO
DATEBUDGET*PROJECT DESCRIPTIONTASK ORDER
$1,225.00 $16,275.00 $17,500.00 CMS for Muni Yard Roof ReplacementTO 48 $1,750.00 $20,125.00 $21,875.00 CMS for Betty Wilson Roof ReplacementTO 49 $69,184.51 $815.49 $70,000.00 CMS for Little Lake Parking LotTO 52 $7,178.75 $62,821.25 $70,000.00 City Hall Roof ReplacementTO 54 $1,975.95 $1,265.00 $3,240.95 Public Outreach ‐ Little Lake School DistrictTO 55 $8,445.41 $1,486.49 $9,931.90 Public Outreach ‐ Fire Station HQ RoofTO 57 $6,615.87 $441.03 $7,056.90 Public Outreach ‐ City Clerks Office RenoTO 58 $5,029.00 $4,967.90 $9,996.90 City Hall Roof ReplacementTO 59 $32,400.00 $21,600.00 $54,000.00 Water Well #2 ImprovementsTO 61 $33,750.00 $20,250.00 $54,000.00 Water Well #12 ImprovementsTO 62 $21,150.00 $32,850.00 $54,000.00 Project Management ‐ Various ProjectsTO 63 $19,800.00$19,800.00 Project Management ‐ Various ProjectsTO 64 $18,000.00 $5,625.00 $23,625.00 Project Management ‐ Rosecrans/MarquardtTO 65 SOUTHSTAR ENGINEERING ‐ INVOICE SUMMARY
Billing Period 11/1/2023‐11/30/2023
Santa Fe Springs Sample Task Orders
OUR TEAM OF INSPECTORS FLAWLESSLY
MANAGED THE CONSTRUCTION OF 97 NEW
ADA COMPLIANT RAMPS ON THE LA QUINTA
COMPLETE STREETS PROJECT. BY ENSURING THAT
EACH RAMP WAS CONSTRUCTED CORRECTLY ON
THE FIRST ATTEMPT, THE CITY WAS REIMBURSED
ALL FUNDING ON THE PROJECT FOR MEETING ALL
CONTRACT REQUIREMENTS.
THROUGH OUR METICULOUS RFI PROCESS, WE
SUCCESSFULLY MONITORED AND ADAPTED TO
VARIOUS FIELD CONDITIONS ON THE PRESTIGIOUS
PRESIDENTS’ PLAZA IMPROVEMENTS PROJECT.
BY EFFECTIVELY MANAGING THE DISCOVERY AND
DESIGN OF BURIED MANMADE OBJECTS AND
UTILITIES, WE DEMONSTRATED OUR ABILITY TO
THINK QUICKLY ON OUR FEET AND ULTIMATELY
SAVED THE AGENCY $500,000.
ON THE I-215 WIDENING SOUTH SEGMENT
FOR RCTC (12 LANE MILES OF NEW PAVEMENT
AND SIX MILES OF TYPE 60 BARRIER) WE
SUGGESTED A STAGING METHOD DURING
THE CONSTRUCTIBILITY REVIEW PHASE THAT
REDUCED THE NUMBER OF WORKING DAYS
ON THE CONTRACT BY 150 DAYS. THIS SAVED
APPROXIMATELY $1.5 MILLION IN CONSTRUCTION
AND SUPPORT COSTS.
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 20 Fee SCHedule
SOUTHSTAR | DCCM FEE PROPOSAL
Southstar | DCCM understands that it is required to provide a Schedule of Hourly Rates that identifies the job titles of all personnel to be assigned to City projects. The term of the proposed Agreement shall be from July 1, 2024 to June 30, 2027. DCCM understands the City may review the successful Contractor’s performance under the Agreement and, upon mutual agreement with Contractor, may extend the Agreement beyond the initial term, for additional one (1) year periods from July 1st to June 30th of each year.
All Southstar | DCCM individual rates will be provided within the billing rate per hour range shown below and will be subject to an annual increase consistent with CPI index. Included below is a rate sheet that includes the rates for the personnel included in this proposal, as well as the general classifications for additional resources, if the City were to have an additional need and request their expertise on a project. These rates are fully burdened rates and include all overhead, benefits, etc.
Southstar | DCCM greatly appreciates the opportunity to submit our hourly fee schedule below.
Southstar | DCCM Rates for Services
Position Billing Range Per Hour
Principal-in-Charge $195.00 -$306.60
Construction Inspection $109.00 -$196.27
Structures Inspection $190.00 -$281.14
Additional Resources Rates, As Needed
Name Billing Range Per Hour
Construction Manager $190.00 -$291.75
Structures Representative $190.00 -$281.14
Project Manager $190.00 -$285.31
Project Engineer $150.00 -$242.95
Resident Engineer $190.00 -$291.75
Assistant Resident Engineer $175.00 -$242.95
Document Control Specialist $89.00 -$179.29
Labor Compliance $89.00 -$164.44
Public Outreach Specialist $88.00 -$158.07
Utilities Coordinator $92.00 -$189.90
Scheduler $92.00 -$211.12
Office Support $65.00 -$147.47
Our subconsultant cost information can be found on the following pages, which are also subject to 15% markup and will be included in proposed task orders for negotiation. Southstar greatly appreciates the opportunity to submit our hourly fee schedule.
Fee SCHedule
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 21 Ninyo & Moore | City of Downey, On-Call Construction Management, Materials Testing and Inspection Services | 04-04558 | March 11, 2024 CA16
Schedule of Fees
Hourly Charges for Personnel
Professional Staff
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 250 Senior Engineer/Geologist/Environmental Scientist ............................................................................................... $ 235 Senior Project Engineer/Geologist/Environmental Scientist ................................................................................... $ 220 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 210 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 200 Staff Engineer/Geologist/Environmental Scientist................................................................................................... $ 180 GIS Analyst .............................................................................................................................................................. $ 160 Technical Illustrator/CAD Operator.......................................................................................................................... $ 140 Field Staff
Certified Asbestos/Lead Technician ........................................................................................................................ $ 220 Field Operations Manager ....................................................................................................................................... $ 150 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 145 Supervisory Technician ........................................................................................................................................... $ 140 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) ............................................ $ 135 Senior Technician .................................................................................................................................................... $ 135 Technician ................................................................................................................................................................ $ 130 Administrative Staff
Information Specialist .............................................................................................................................................. $ 120 Geotechnical/Environmental/Laboratory Assistant ................................................................................................. $ 120 Data Processor ........................................................................................................................................................ $ 95 Other Charges
Concrete Coring Equipment (includes technician) .............................................................................................. $ 190/hr Anchor Load Test Equipment (includes technician) ........................................................................................... $ 190/hr GPR Equipment ................................................................................................................................................... $ 180/hr State of California Prevailing Wage Surcharge................................................................................................... $ 30/hr Inclinometer ......................................................................................................................................................... $ 100/hr Hand Auger Equipment ....................................................................................................................................... $ 80/hr Rebar Locator (Pachometer) ............................................................................................................................... $ 25/hr Vapor Emission Kit .............................................................................................................................................. $ 65/kit Nuclear Density Gauge ....................................................................................................................................... $ 12/hr X-Ray Fluorescence ............................................................................................................................................ $ 70/hr PID/FID ................................................................................................................................................................ $ 25/hr Air Sampling Pump .............................................................................................................................................. $ 10/hr Field Vehicle ........................................................................................................................................................ $ 15/hr Expert Witness Testimony ................................................................................................................................... $ 450/hr Direct Expenses .................................................................................................................................... Cost plus 15 % Special equipment charges will be provided upon request.
Notes
Our field services, are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding 4 hours. Overtime rates at 1.5 times the regular rates will be charged for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays.
Field services that may be subject to prevailing wage in accordance with AB 1768 and Prevailing Wage Determinations, will be subject to a prevailing wage surcharge as shown in our Schedule of Fees. Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the project, as applicable.
Fee SCHedule
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 22
Ninyo & Moore | 2021 Laboratory Testing
Schedule of Fees for Laboratory Testing
SOILS CONCRETE
Atterberg Limits, D 4318, CT 204 .............................................................. $ 170 Compression Tests, 6x12 Cylinder, C 39 ................................................... $ 35 California Bearing Ratio (CBR), D 1883 .................................................... $ 550 Concrete Mix Design Review, Job Spec ..................................................... $ 300 Chloride and Sulfate Content, CT 417 & CT 422 ..................................... $ 175 Concrete Mix Design, per Trial Batch, 6 cylinder, ACI ............................... $ 850 Consolidation, D 2435, CT 219 .................................................................. $ 300 Concrete Cores, Compression (excludes sampling), C 42 ....................... $ 120 Consolidation, Hydro-Collapse only, D 2435 ............................................ $ 150 Drying Shrinkage, C 157 .............................................................................. $ 400 Consolidation – Time Rate, D 2435, CT 219 ............................................ $ 200 Flexural Test, C 78 ....................................................................................... $ 85 Direct Shear – Remolded, D 3080 ............................................................ $ 350 Flexural Test, C 293 ..................................................................................... $ 85 Direct Shear – Undisturbed, D 3080 ......................................................... $ 300 Flexural Test, CT 523 ................................................................................... $ 95 Durability Index, CT 229 ............................................................................. $ 175 Gunite/Shotcrete, Panels, 3 cut cores per panel and test, ACI ................ $ 275 Expansion Index, D 4829, IBC 18-3 .......................................................... $ 190 Lightweight Concrete Fill, Compression, C 495 ......................................... $ 80 Expansion Potential (Method A), D 4546 .................................................. $ 170 Petrographic Analysis, C 856 ...................................................................... $ 2,000 Geofabric Tensile and Elongation Test, D 4632 ....................................... $ 200 Restrained Expansion of Shrinkage Compensation .................................. $ 450 Hydraulic Conductivity, D 5084 .................................................................. $ 350 Splitting Tensile Strength, C 496 ................................................................. $ 100 Hydrometer Analysis, D 6913, CT 203...................................................... $ 220 3x6 Grout, (CLSM), C 39 ............................................................................. $ 55 Moisture, Ash, & Organic Matter of Peat/Organic Soils ........................... $ 120 2x2x2 Non-Shrink Grout, C 109 ................................................................. $ 55 Moisture Only, D 2216, CT 226 ................................................................. $ 35 Moisture and Density, D 2937 ................................................................... $ 45 ASPHALT Permeability, CH, D 2434, CT 220 ............................................................ $ 300 Air Voids, T 269 ............................................................................................ $ 85 pH and Resistivity, CT 643......................................................................... $ 175 Asphalt Mix Design, Caltrans (incl. Aggregate Quality) ............................. $ 4,500 Proctor Density D1557, D 698, CT 216, AASHTO T-180 ........................ $ 220 Asphalt Mix Design Review, Job Spec ....................................................... $ 180 Proctor Density with Rock Correction D 1557 .......................................... $ 340 Dust Proportioning, CT LP-4 ........................................................................ $ 85 R-value, D 2844, CT 301 ........................................................................... $ 375 Extraction, % Asphalt, including Gradation, D 2172, CT 382 .................... $ 250 Sand Equivalent, D 2419, CT 217 ............................................................. $ 125 Extraction, % Asphalt without Gradation, D 2172, CT 382 ........................ $ 150 Sieve Analysis, D 6913, CT 202 ................................................................ $ 145 Film Stripping, CT 302.................................................................................. $ 120 Sieve Analysis, 200 Wash, D 1140, CT 202 ............................................. $ 100 Hveem Stability and Unit Weight D 1560, T 246, CT 366 ......................... $ 225 Specific Gravity, D 854 ............................................................................... $ 125 Marshall Stability, Flow and Unit Weight, T 245 ......................................... $ 240 Thermal Resistivity (ASTM 5334, IEEE 442) ............................................ $ 925 Maximum Theoretical Unit Weight, D 2041, CT 309 .................................. $ 150 Triaxial Shear, C.D, D 4767, T 297 ........................................................... $ 550 Moisture Content, CT 370 ............................................................................ $ 95 Triaxial Shear, C.U., w/pore pressure, D 4767, T 2297 per pt ................ $ 450 Moisture Susceptibility and Tensile Stress Ratio, T 238, CT 371 ............. $ 1,000 Triaxial Shear, C.U., w/o pore pressure, D 4767, T 2297 per pt ........................$ 350 Slurry Wet Track Abrasion, D 3910 ............................................................. $ 150 Triaxial Shear, U.U., D 2850 ...................................................................... $ 250 Superpave, Asphalt Mix Verification (incl. Aggregate Quality) .................. $ 4,900 Unconfined Compression, D 2166, T 208 ................................................. $ 180 Superpave, Gyratory Unit Wt., T 312 .......................................................... $ 100 Superpave, Hamburg Wheel, 20,000 passes, T 324 ................................. $ 1,000 MASONRY Unit Weight sample or core, D 2726, CT 308 ............................................. $ 100 Brick Absorption, 24-hour submersion, 5-hr boiling, 7-day, C 67 ............ $ 70 Voids in Mineral Aggregate, (VMA) CT LP-2 .............................................. $ 90 Brick Compression Test, C 67 ................................................................... $ 55 Voids filled with Asphalt, (VFA) CT LP-3 .................................................... $ 90 Brick Efflorescence, C 67 ........................................................................... $ 55 Wax Density, D 1188................................................................................... $ 140 Brick Modulus of Rupture, C 67 ................................................................. $ 50 Brick Moisture as received, C 67 ............................................................... $ 45 AGGREGATES Brick Saturation Coefficient, C 67 .............................................................. $ 60 Clay Lumps and Friable Particles, C 142.................................................... $ 180 Concrete Block Compression Test, 8x8x16, C 140 ................................. $ 70 Cleanness Value, CT 227 ............................................................................ $ 180 Concrete Block Conformance Package, C 90 .......................................... $ 500 Crushed Particles, CT 205 ........................................................................... $ 175 Concrete Block Linear Shrinkage, C 426 .................................................. $ 200 Durability, Coarse or Fine, CT 229 .............................................................. $ 205 Concrete Block Unit Weight and Absorption, C 140 ................................ $ 70 Fine Aggregate Angularity, ASTM C 1252, T 304, CT 234 ....................... $ 180 Cores, Compression or Shear Bond, CA Code ........................................ $ 70 Flat and Elongated Particle, D 4791............................................................ $ 220 Masonry Grout, 3x3x6 prism compression, C 39 ..................................... $ 45 Lightweight Particles, C 123 ........................................................................ $ 180 Masonry Mortar, 2x2 cube compression, C 109 ....................................... $ 35 Los Angeles Abrasion, C 131 or C 535 ....................................................... $ 200 Masonry Prism, half size, compression, C 1019 ...................................... $ 120 Material Finer than No. 200 Sieve by Washing, C 117 .............................. $ 90 Masonry Prism, Full size, compression, C 1019 ...................................... $ 200 Organic Impurities, C 40 .............................................................................. $ 90 Potential Alkali Reactivity, Mortar Bar Method, Coarse, C 1260 ............... $ 1,250 REINFORCING AND STRUCTURAL STEEL Potential Alkali Reactivity, Mortar Bar Method, Fine, C 1260 .................... $ 950 Chemical Analysis, A 36, A 615................................................................. $ 135 Potential Reactivity of Aggregate (Chemical Method), C 289 ................... $ 475 Fireproofing Density Test, UBC 7-6........................................................... $ 90 Sand Equivalent, T 176, CT 217 ................................................................. $ 125 Hardness Test, Rockwell, A 370 ............................................................... $ 80 Sieve Analysis, Coarse Aggregate, T 27, C 136 ........................................ $ 120 High Strength Bolt, Nut & Washer Conformance, Sieve Analysis, Fine Aggregate (including wash), T 27, C 136................. $ 145 per assembly, A 325 ............................................................................. $ 150 Sodium Sulfate Soundness, C 88 ............................................................... $ 450 Mechanically Spliced Reinforcing Tensile Test, ACI ................................ $ 175 Specific Gravity and Absorption, Coarse, C 127, CT 206 ......................... $ 115 Pre-Stress Strand (7 wire), A 416 .............................................................. $ 170 Specific Gravity and Absorption, Fine, C 128, CT 207 .............................. $ 175 Reinforcing Tensile or Bend up to No. 11, A 615 & A 706...................... $ 75 Structural Steel Tensile Test: Up to 200,000 lbs., A 370 ......................... $ 90 ROOFING Welded Reinforcing Tensile Test: Up to No. 11 bars, ACI ....................... $ 80 Roofing Tile Absorption, (set of 5), C 67 ..................................................... $ 250 Roofing Tile Strength Test, (set of 5), C 67 ................................................ $ 250
Special preparation of standard test specimens will be charged at the technician’s hourly rate.
Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.
Fee SCHedule
Southstar | DCCM | Response to City of Downey, RFQ No. 24-02 | March 15, 2024 23
Director of Public Works/City Engineer
Department of Public Works
11111 Brookshire Avenue
Downey, CA 90241-7016
Attachment E
S ECTION C | T ECHNICAL P ROPOSAL
Prepared for:
City of Downey
Department of Public Works
11111 Brookshire Avenue
Downey, CA 90241-7016
Contact: Matthew Baumgardner, P.E.
Director of Public Works / City Engineer
Phone: (562) 904-7110
E-mail: [email protected]
Prepared by:
TKE Engineering, Inc.
2305 Chicago Avenue
Riverside, CA 92507
Contact: Terry Renner, P.E., P.L.S., Q.S.D.
Senior Vice President
Phone: (951) 680-0440
E-mail: [email protected]
TABLE OF CONTENTS
Section A | Executive Summary
Section B | Qualifications of the Firm
Section C | Organizational Chart, Key Personnel, & Subconsultants Section D | Relevant Project Experience
Section E | Client References
Section F | Fee Schedule
Section G | Project Management & Methodology
Section H | Additional Information
P a g e |1
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION A | EXECUTIVE SUMMARY
March 15, 2024
Matthew Baumgardner, P.E., Director of Public Works / City Engineer City of Downey
11111 Brookshire Avenue
Downey, CA 90241-7016
Subject: Request for Qualifications for FY 2024-2027 On-Call Public Works Construction Management, Inspection, and Materials Testing
Dear Mr. Baumgardner:
Thank you for the opportunity to present TKE Engineering, Inc. (TKE)’s proposal to provide professional On-Call Public Works Construction Management, Inspection, and Materials Testing to the City of Downey (City). TKE is enthusiastic about the opportunity to assist the City with these services.
Why should the City choose TKE to provide the requested services? Please consider the following:
1. Legal Firm Identification – TKE Engineering, Inc., a California Corporation, is a full service, multi-disciplinary consulting corporation located at 2305 Chicago Avenue, Riverside, California 92507 and can be found online at www.tkeengineering.com or reached by phone (951) 680-0440 or fax (951) 680-0490. Established on June 16, 2000, we have 24 years of experience with providing on-call construction management and inspection services to public agencies and are highly qualified to perform the services necessary for project delivery.
2. Key Contact - Terry Renner, P.E., P.L.S., Q.S.D., Principal-in-Charge | Construction Manager, is an authorized signatory of the firm and will be TKE’s contact person for the duration of the proposal evaluation and contract. He can be reached by telephone at (951) 680-0440 and e-mail at [email protected].
3. Firm Description - TKE was established with the goal of providing turnkey services for municipal construction management and inspection services for public works projects in order to benefit our community. As a result of the focus of a firm on this mission, TKE has earned a reputation for thoroughness, rapid turnaround, cost efficiency and overall quality of services. We are a highly motivated, dynamic firm with the goal of being the City’s preferred consultant. As a firm dedicated to public service, TKE’s experience is exclusively related to municipalities and thereby avoid any conflicts of interest.
4. Grant Funding Experience and Qualifications - TKE has been providing professional construction management and inspection services on over $300M in federally and state funded public works projects to numerous municipalities for the past 24 years. As such, we have a thorough knowledge of the Caltrans LAPM standards and requirements.
5. Project Staff - Mr. Renner will be overseeing and managing the work of our key personnel, each of whom have extensive experience providing public works construction management and inspection. Supporting Mr. Renner will be TKE’s key personnel, including Construction Manager, Justin Schlaefli, P.E., T.E., P.T.O.E., Construction Manager, Steven Ledbetter, P.E., Assistant Construction Manager, Marvin Lara, E.I.T., Assistant Construction Manager, Chance Renner, E.I.T., Senior Public Works Inspector Brad Enscoe, Jeff Lantosh, CPII and Nelson Blackwell, CPII. TKE can also call upon any of our 12 inspectors to provide necessary services. Our team includes dedicated members of our construction management and inspection staff. As such, they will remain in-place throughout the term of the contract. There will not be any changes in personnel during the contract duration without prior approval by the City .
6. Proposed Sub-Consultants - TKE has retained Koury Engineering & Testing, Inc. (Khoury) for Material testing services as our subconsultant for this on-call contract.
7. Authorization & Exceptions - TKE’s proposal letter is signed by a person who is authorized to bind the company to contract agreements. TKE has no exceptions to the terms of the RFP and Professional Services Agreement. We are committed to accepting the terms and conditions within the RFP and Professional Services Agreement.
Thank you for your consideration. TKE would very much appreciate the opportunity to provide engineering services. If you have any questions, please call me at (951) 680-0440.
Sincerely,
Terry Renner, P.E., P.L.S., Q.S.D. | Senior Vice President | TKE ENGINEERING, INC.
P a g e | 2
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION B | QUALIFICATIONS OF THE FIRM
SECTION B | QUALIFICATIONS OF
THE FIRM
1. F I R M P R O F I L E
TKE has managed publicly grant and locally funded construction projects for more than 24 years. The breadth of experience and technical skill of our staff enable us to manage a wide variety of projects, ranging from major infrastructure to the restoration and rehabilitation of minor roadways. TKE has performed construction management services for a wide variety of
projects from small projects like traffic signal and sidewalk infill installation to multimillion dollar construction projects including the Regional Water Reclamation Facility, SBMWD Reservoir Seismic Retrofit Project, 5th Street Improvement Project, San Bernardino Avenue Street Widening and Storm Drain Improvements Project, San Bernardino Avenue Trunk Sewer Project, Upland Basin Phases I and II Improvements Project, and Foothill Boulevard Street Improvements Project.
TKE’s corporate structure guarantees that the principals of the firm will be intricately involved with all aspects of the project which translates to innovative solutions, effective
communication and project stability for the City. TKE’s principals and support staff are highly qualified in managing all sizes and types of projects and have a proven track record of successfully delivering even the most challenging projects. In addition, our teams personal background and knowledge of the City, brings a team with in depth knowledge of the City standards and specifications, Caltrans LAPM requirements, local agencies and utility companies, and City project goals to ensure that the City’s best interests are fully covered in the event of the contractor requesting extra work, change orders or any type of additional compensation or working days, thereby maximizing the potential for project success.
In addition, TKE has extensive construction administration experience for all types of projects with numerous funding sources. TKE has performed construction administration services for projects with funding sources that include State and Federal Safe Routes to Schools (SR2S), Safe, Accountable, Flexible, Efficient Transportation Act: A legacy for users (SAFE TEA-LU), Mobile source Air Pollution Reduction Review
Committee (MSRC), Active Transportation Program (ATP), Local Partnership Program, California State Revolving Fund (SRF), Federal Highway Safety Improvement Program (HSIP),
American Recovery and Reinvestment Act (ARRA), Community Development Block Grant Program (CDBG), Article III California Department of Public Health (CDPH), State Water Resource Control Board (SWRCB), County Economic Development
Agency (EDA), California Department of Parks and Recreation and numerous locally funded projects. The projects
constructed include street widening, street rehabilitation, sidewalk, trails, traffic signals, median curb with hardscape, TKE Engineering, Inc. | AT A GLANCE
City/District Inspection
TKE provides On-Call Construction Management
and Inspection for 15 Cities/Districts
Department of Industrial Relations
TKE and its subconsultants are registered with the
Department of Industrial Relations
TKE DIR Number 1000413173
Construction Management Contracts
TKE has provided construction management and
inspection on more than $500 Million in projects
over the past 24 years. Including more than $300
Million in Grant funded projects.
City/District Engineer
City Engineer in 5 Cities/Districts
Size of Organization
53 Construction Managers, Inspectors,
Professional Engineers, Plan Checkers, Traffic
Engineers, Surveyors, Designers, Project
Managers, and Support Staff
Headquarters Office
TKE Engineering, Inc.
2305 Chicago Avenue
Riverside, CA 92507
Years in Business
TKE has conducted business for the past 24 years
and has 24 years of experience in providing
construction management and inspection
services for public clients.
Company Structure
TKE is a California Corporation founded in June
2000. TKE has no affiliates or subsidiary
companies. California Business License Number:
00109901. TKE DIR No. 1000413173
Firm Owners
Michael P. Thornton, P.E., P.L.S., M.S. – President
Terry Renner, P.E., P.L.S., Q.S.D. –
Senior Vice President
Steven W. Ledbetter, P.E. Vice President
City of Downey
Point of Contact
Terry Renner, P.E., L.S., Q.S.D.
Senior Vice President
2305 Chicago Avenue
Riverside, CA 92507
Phone: (951) 680-0440
Email: [email protected]
P a g e | 3
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION B | QUALIFICATIONS OF THE FIRM
pedestrian enhancement, landscape and lighting, storm drain, flood control and aquifer recharge basins, bus transfer stations and stop enhancements, water conveyance, pumping and
storage facilities, wastewater treatment plants construction and expansions, wastewater gravity and force main conveyance systems, wastewater lift stations, septic to sewer conversions, recycled water conveyance, pumping and storage systems, park development and community revitalization improvements and public facilities and building construction.
TKE’s primary office is located in a business owned 7,000 square foot office building at 2305 Chicago Avenue in Riverside. TKE currently maintains a staff of 53 construction managers and inspectors, project managers, engineers, traffic engineers, plan checkers surveyors, drafters, and clerical personnel.
TKE Engineering, Inc. continues to be the preferred consultant for a number of our clients across Los Angeles, Orange, Riverside and San Bernardino counties because our Team of licensed experts have built strong working relationships through strategic collaboration, implementation of industry best practices and lessons learned on each project; ultimately resulting in successful project completion to our clients’ satisfaction. Our Team has the capabilities and capacities to support the City of Downey in addressing its Strategic Issues by achieving the following:
Δ Support and uphold a Positive City Image through
submission of consistently thorough and
compliant plan checks
Δ Demonstrating Exemplary Leadership by holding
ourselves accountable to delivering quality services
Δ Offering Public Service Excellence through further
development of a strong working partnership with the
City so we may best understand how to provide
necessary services that are of high priority
TKE has provided numerous municipalities and agencies
throughout Southern California with consulting inspection services and staffing for every facet of Public Works. In addition, we have worked on multi-million-dollar regional mega projects for a variety of government agencies. TKE recognizes the importance of staffing based on a client’s need and
workload. Our flexible support and qualified staff enable our clients to serve their constituents in a cost effective and efficient manner.
C O N S T R U C T I O N M A N A G E M E N T
TKE has managed publicly funded construction projects
throughout our history. The breadth of experience and
technical skill of our staff enable us to manage a wide variety of projects, ranging from major infrastructure to the restoration and rehabilitation of significant historical structures. TKE has routinely performed administration of the contract (general contract administration and oversight of project), provided Resident Engineering services pursuant to Caltrans/Federal requirements, constructability reviews on project documents, managed preconstruction and weekly progress meetings,
coordinated with contractors, including multiple contractors simultaneously, coordinated with design engineers for design changes and corrections, coordinated with the project
inspector, reviewed and responded to RFI’s, reviewed weekly statement of working days, reviewed quantities for monthly progress payments, reviewed extra work tickets and assessed them for justification within the contract requirements, process control documents, submittals, change orders, and work
change directives, prepared and performed contract change orders and negotiations, coordinated with residents and businesses throughout construction process, performed public outreach, represented City’s with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, managed engineering budgets and
project schedules, documented environmental compliance, prepared and acquired right-of-way, coordinated utility relocations, acquired and managed permits from numerous agencies, including Caltrans, South Coast AQMD, BNSF, UP, Riverside County Flood Control & Water Conservation District, U.S Army Corps of Engineers, California Department of Fish and Wildlife, Regional Water Quality Control Board and many others, managed numerous funding programs through Caltrans Local Assistance and various other State and Federal funding agencies.
TKE has extensive experience with providing construction management services on all types of public works projects. We are extremely familiar with the Greenbook, requirements of plans and specifications, and California public contract code in relation to construction projects and various related work. We ensure that all work is completed in accordance with funding contract specifications, terms, conditions, state and federal laws and regulations, and client policy. Our construction management portfolio includes:
Δ Conventional and Rubberized Pavement
Rehabilitation Projects
Δ Pedestrian Improvement Projects
Δ Street Widening Projects
Δ Sidewalk Repair and ADA Compliance
Projects
Δ Conventional and Rubberized Pavement
Coating Project
Δ PCC Paving Projects
Δ Traffic Signal and Striping Projects
Δ Signing and Striping
Δ Bus Transfer Stations
Δ Parking Lot Projects
Δ Parks and Other Public Facilities
Δ Grading and Retaining Walls
Δ Storm Drains and Channels
Δ Retention and Detention Basins
Δ Potable and Recycled Water Mains
Δ Reservoirs
Δ Pump Stations
Δ Filtration Systems
P a g e | 4
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION B | QUALIFICATIONS OF THE FIRM
Δ Sanitary Sewer Gravity and Force Mains
Δ Lift Stations
Δ SCADA and Communications
Δ Site Improvement Projects
Δ Major Infrastructure Projects
Δ Reconstruction and Rehabilitation
TKE’s construction management services are enhanced by
integration with our knowledge and background of civil
engineering, traffic engineering and surveying to facilitate and ensure all construction projects managed by TKE will operate safely and efficiently.
I N S P E C T I O N
TKE provides experienced, highly qualified staff with significant technical expertise and strong public relations skills for inspection services. All of TKE’s inspectors have a background within design and construction, enabling TKE to provide well rounded inspectors capable of understanding the requirements to construct a project and capable of identifying potential change orders and design deficiencies before they occur. TKE is fully capable of providing staff on a full-time, part-time, on- call or interim project basis. Please refer to our project team, together with our corporate resumes to verify our team’s technical ability to deliver these services.
TKE has provided similar services to those requested here for a number of different agencies. TKE understands that each jurisdiction has its own development and capital improvement standards that were developed to meet the needs of that particular community. TKE has a thorough understanding of these standards together with the needs of the community needs. For each project that TKE is assigned, TKE will verify compliance with all applicable standards. Furthermore, with our extensive experience in other jurisdictions, TKE will be able to recommend improvements to these standards to ensure
expedited project delivery and enhanced public
infrastructure. Our inspection portfolio includes:
Δ Daily review and documentation of construction
activities (daily reports and digital photo of significant issues and milestones)
Δ Monitor Contractor’s daily labor force for compliance with state & federal labor laws.
Δ Field verification of traffic control procedures and
consistency with approved Traffic Control Plan
Δ Coordinate with agencies and different stakeholders
to ensure smooth progress of construction activities
Δ Monitor project schedule
Δ Verify quantities and assuring quality control
Δ Field observations of construction activities
Δ Maintain complete and accurate project records
compliant with Caltrans manual
Δ Review and recommend approval/disapproval of
monthly progress pay estimates
Δ Verify NPDES and SWPPP compliance
Δ Prepare weekly statement of working days
Δ Review RFI’s, change orders and progress payments
Δ Coordinate punch list and as-built plans
Δ Ensure that materials and completed work comply
with plans specifications and design criteria
Δ Implement security procedures
Δ Issue notices for safety concerns and violations
Δ Coordinate with survey, material testing and other
construction consultants
Δ Review and ensure compliance with control
documents, submittals, RFI’s, change orders, and work
change directives
Δ Compliance with Caltrans encroachment permit
requirements, if required
Δ Preparation of punch list
Δ Coordinate project closeouts activities which include staff report, Notice of Completion, release of
retention, warranty walk, and archiving documents.
G R A N T F U N D S M A N A G E M E N T
TKE’s Grant Funds Management team enables our municipal and agency partners of any size to find potential funding sources and to prepare competitive funding
applications. Additionally, after funds are awarded to a partner, TKE ensures compliance with state and federal funding requirements. In the past few years, TKE has obtained nearly $100 million dollars in funding for our public works water and transportation improvements and has provided grant
management assistance on construction projects for more than $300 million of construction projects. Notably, TKE has assisted Mission Springs Water District in securing over $68 million in state Water Resources Control Board Grant Funding for its Regional Water Reclamation Facility. In addition, TKE is helping MSWD secure over $300,000 for well rehabilitation, over $900,000 for Septic to Sewer projects, and over $260,000 water for conservation. TKE continues to actively pursue grant opportunities for MSWD and administer them through project completion.
Our grant services are enhanced by integration with
engineering services to facilitate and integrate project design. This expedites project start up and completion and ensures compliance with funding requirements.
This service is so valued by our clients that our dedicated Funding Specialist is supported by several staff members. TKE has assisted clients secure funding from the following
programs:
Δ State Water Resources Control Board - State Revolving Fund (SRF) Program
Δ Department of Water Resources – Proposition 40
Grant Program
Δ Department of Water Resources - Infrastructure
Rehabilitation Grant
Δ SRTS and SR2S (Safe Routes to Schools)
Δ Federal Transportation Funding thru Caltrans Local
Assistance
P a g e | 5
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION B | QUALIFICATIONS OF THE FIRM
Δ State Proposition 1E and 84 Flood Management
Funding
Δ Community Development Block Grant (CDBG) Funding
Δ Active Transportation Program (ATP) Funding
Δ Highway Safety Improvements Program (HSIP)
Funding
Δ Safe, Accountable, Flexible, Efficient Transportation Act: A legacy for users (SAFE TEA-LU)
Δ Mobile source Air Pollution Reduction Review
Committee (MSRC)
Δ Local Partnership Program (LPP)
Δ American Recovery and Reinvestment Act (ARRA),
Δ American Rescue and Protection Act (ARPA)
Δ Economic Development Agency (EDA)
Δ California Department of Parks and Recreation
C O M M U N I T Y O U T R E A C H / P U B L I C
R E L A T I O N S
Depending on the City’s needs, TKE’s strategies are designed to reach, inform and involve constituents and stakeholders of planning proposals, projects and programs. If requested, we can provide opportunities for interested parties to comment, enabling actionable analysis of feedback received. TKE’s outreach methods result in building greater consensus and public buy-in. Services include the design, planning and execution of:
Δ Marketing Campaigns
Δ Public Information Meetings/Groundbreaking
Ceremonies
Δ Project Branding
Δ Project Website Design and Construction
Δ Bilingual Project Collateral Materials (Brochures,
Presentation Boards, etc.)
Δ Graphic Design
2. F I R M ’ S F I N A N C I A L
C O N D I T I O N
TKE’s organizational structure has steadily grown since our inception, which provides us with a solid foundation and ensures successful completion of any City project. In TKE’s 24 years of business, not a single TKE project has gone through litigation. TKE does not have any current or pending
bankruptcy, litigation, and outstanding claims for or against the firm. TKE does not have any planned office closures or mergers that may impede TKE’s ability to provide on -call construction management and inspection services. TKE has an annual gross revenue of more than $10 million. No conditions or
organizational conflicts of interest exists that will affect the ability of TKE to perform the required duties as described in this proposal.
3. R E C E N T P R O J E C T
E X P E R I E N C E
TKE takes pride in our reputation for thoroughness, rapid turnaround, cost efficiency and overall quality of work, and believes that a high level of quality is needed for construction management and inspection of all Projects in order to protect the City’s interest, enforce the contract documents and minimize change orders. It is our standard to demonstrate proactive leadership and implement effective communication and management practices. As the City’s qualified professional consultant, our team will adopt the City’s construction Delivery Process and ensure best practices are being implemented for timely project delivery completed within budget. As the City’s reliable service provider, we will strategically apply lessons learned from our collective years of experience to deliver quality services and strictly enforce the contract documents.
The following pages showcase TKE’s depth and breadth of resources, which will be led by our team of expert key
personnel. The following project examples showcase our
team’s experience in performing work of a similar nature to the scope provided in the RFP. This experience highlights a few of our recent projects and we encourage you to contact the references associated with each of them.
●●●
Over TKE’s 24 years of business,
ZERO
of TKE’s projects have gone through litigation.
●●●
P a g e | 6
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT S
Construction Manager
Steven Ledbetter, P.E.
TKE Engineering, Inc.
Principal-In-Charge/Construction Manager
Terry Renner, P.E., L.S., Q.S.D.
TKE Engineering, Inc.
Construction Manager
Justin Schlaefli, P.E., T.E., P.T.O.E.
TKE Engineering, Inc.
Assistant Construction Manager
Marvin Lara E.I.T.
TKE Engineering, Inc.
Senior Public Works Inspector
Jeff Lantosh, C.P.I.I.
TKE Engineering, Inc.
Assistant Construction Manager
Chance Renner E.I.T.
TKE Engineering, Inc.
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT S
SUPPORT TEAM
(53+ M e m b e r s )
Senior Public Works Inspector
Nelson Blackwell, C.P.I.I.
TKE Engineering, Inc.
Senior Public Works Inspector
Brad Enscoe
TKE Engineering, Inc.
Subconsultant:
1. O R G A N I Z A T I O N A L
C H A R T
P a g e |7
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
2. K E Y P E R S O N N E L
TKE’s key staff assigned to perform the services required are identified and discussed in detail within the following section. As discussed previously, TKE currently maintains a staff of 51 personnel who are highly qualified to assist with any of the required services for this contract.
TKE has two unique advantages associated with the experience of TKE’s project team. One benefit of TKE’s project team is our extremely low internal turnover rate. As a result of our rigorous interview and testing procedures, coupled with our extremely high employee satisfaction rates, TKE staff has years of experience working together. The close relationships each of our staff members have with one another provide the City with an extremely well rounded and experienced team. As such, TKE’s project team experience directly correlates with TKE’s firm experience described previously.
The second benefit of TKE’s project team is our internal training procedures. TKE has strived to develop techniques that reach outside the box and develop well rounded individuals
committed to providing high quality, efficient services to meet all our clients’ needs. TKE trains our staff on every facet of engineering design and construction to provide a level of knowledge that can identify problems in every phase of a project, from planning through construction.
It is this commitment to service and diverse array of offerings that makes us unique and drives our long-standing relationships with our client base. Understanding that all aspects of on-call miscellaneous consulting services are important to ensure the City’s interests are protected and project schedules are met, our team brings TKE management level professionals to
projects ensuring that every aspect receives full and
comprehensive consideration. It is this personal touch and contact that define our ‘local service’ approach. We consider ourselves community builders and take ownership of services requested from TKE, ensuring that our personnel will be allocated on an as-needed basis in order to complete all services on schedule and within specified budget. TKE is committed to responding to our clients’ needs as they arise.
Terry Renner, P.E., P.L.S, Q.S.D.
Principle-in-Charge /
Construction Manager
R.C.E. No. 69984
P.L.S. No. 9762
Q.S.D. Certification No. 24329
Mr. Renner is the Senior Vice President
of TKE and has over 24 years of experience in civil engineering design, plan checking, project management and construction management of both development and public works
infrastructure projects, including grading improvements, street and transportation improvements, traffic engineering, drainage improvements, water improvements, sewer improvements,
facilities improvements, and recreation improvements. He currently provides traffic and transportation engineering services to the cities of Calabasas, El Monte, South El Monte, Glendora, Azusa, Fontana, Calimesa, Upland, Wildomar,
Highland, and Adelanto. His experience includes services during pre-project planning, design, plan review, construction management and inspection, along with operations and
maintenance. He also has experience conducting traffic studies, specialized access analysis, parking studies, signal operations, signal timing, and traffic control. He has successfully delivered a wide variety of complex and
challenging projects and is dedicated to ensuring that the plans produced by TKE continue to exceed industry standards.
Steven Ledbetter P.E.
Construction Manager
R.C.E. No. 84044
Mr. Ledbetter has over 23 years of
professional experience in the civil
engineering industry. He has handled
various critical and challenging projects from planning through design and implementation; all while ensuring that projects are executed as per specification in the stipulated time with quality.
He has a well-rounded background with experience in:
preparation and analysis of street and utility improvement plans and specifications including potable and non -potable water, wastewater, and drainage; utility master planning including computer modeling, analysis, and report preparation; water resource planning and management including feasibility studies, urban water management planning, water supply
assessments and verifications, integrated regional water management planning, and groundwater management
planning; storm water compliance reporting including water quality management plans and storm water pollution
prevention plans and; and grant writing and administration for various State and Federal agency programs.
Justin Schlaefli, P.E., T.E., P.T.O.E.
Traffic Engineer /
Construction Manager
R.C.E. No. 69984
Justin has over 23 years of experience in
the transportation field. He is
responsible for managing projects on a
day-to-day basis as well as interfacing
with other project team members and decision makers/
government staff and Contractors. He specializes in Intelligent Transportation Systems, Transportation Planning,
P a g e |8
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
Construction, Signal Maintenance, Traffic Engineering and Traffic Operations. He has experience working on both public sector projects as well as private sector development. His experience ranges from construction management and
inspection to operations and maintenance. He also has
experience conducting traffic studies, specialized access analysis, parking studies, trip generation studies, traffic micro- simulation, signal operations, signal timing, traffic control and design/build of ITS solutions. In addition, Justin has served as a subject matter expert in court, for the State of California and for vendors in the transportation industry. Finally, Justin has overseen design/build projects for signal modification and ITS improvements including projects in Caltrans jurisdiction and involving multi-agency coordination.
Marvin Lara, E.I.T.
Assistant Construction Manager
E.I.T. No. 157100
Mr. Lara is an Associate Engineer of TKE
and has 7 years of experience in civil
engineering infrastructure projects,
including transportation improvements,
drainage improvements, sewer and water improvements,
facilities improvements, recreation improvements, and
construction methods. He has managed numerous projects and has delivered projects for the Cities of Highland, Moreno Valley, Glendora, Calimesa, Fontana, Rialto, Hesperia and Redlands. As a Construction Assistant, Mr. Lara has been responsible for assistance in supervising a staff of inspectors, construction coordination and scheduling, utility relocation coordination, public relations, submittal review, coordination with
subconsultants, weekly progress meetings, request for
information responses, storm water management, progress payments, change order review and negotiations, labor
compliance, and project closeout.
Brad Enscoe
Senior Public Works Inspector
OSHA 30 Certified
16 Hour QSP Training Seminar
Mr. Enscoe has over 18 years of
experience providing public works
construction inspection services. Recently, Mr. Enscoe is providing on-call inspection services to the City of Calimesa for developer installed housing projects as well as street, drainage, and sewer improvements to the Cities of Fontana, Redlands, and El Monte. In addition to daily inspection services, Mr.
Enscoe has prepared daily inspection reports, developed construction photo logs, assisted with progress and final payment processing, assisted with change order negotiations, verified compliance with contract documents and approved project submittals, verified public safety compliance,
developed remedial work list and system startup inspections.
In addition, Mr. Enscoe has provided coordination with other project professional services (e.g., Geotechnical and Surveying).
Nelson Blackwell, C.P.I.I.
Senior Public Works
Inspector/Special Inspector
ICC - Special Inspector, Soils,
Reinforced Concrete, Reinforced
Masonry and ACI Field Testing,
Technician Grade 1Special
Inspection Certification and
Training Southwest Training and Calibration
Mr. Blackwell has over 8 years of experience providing
inspection services for capital projects to several agencies throughout Southern California. His services include but are not limited to site grading, sewer and waterline installation, street paving, American Disabilities Act (ADA) improvements,
underground infrastructure, utilities installation, steel reinforcements, concrete and masonry, path/retaining walls, and parking lot installation. Additionally, he is skilled in understanding project plans and specifications, accessing applicable code, maintaining good and proper relationships with project stakeholders and contractors, and helping to prepare final project documents. Mr. Blackwell has prepared daily inspection reports, developed construction photo logs, verified compliance with contract documents and approved project submittals, and verified public safety compliance.
Jeffrey Lantosh, C.P.I.I.
Senior Public Works
Inspector/Special Inspector
CPII – Certified Public
Infrastructure Inspector, ICC -
Special Inspector, Soils, Structural
Masonry, Reinforced Concrete,
and Prestressed Concrete APNGA
Portable Nuclear Gauge | Radiation Safety Officer Class South West Calibration and Training
Mr. Lantosh has over 12 years of inspection experience with the providing public works inspection services. Mr. Lantosh has provided inspection services to several municipalities
throughout Southern California. He has completed project inspection services for the cities of Fontana, Riverside, Moreno Valley, Highland, Calimesa, Riverside Transit Agency, and the County of San Bernardino. Mr. Lantosh’s background in public
P a g e |9
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
works inspection and oversight provide him with an extensive knowledge of ASTM specifications and OSHA standards.
Additionally, Mr. Lantosh has provided coordination with other project professional services including geotechnical and survey.
Mr. Lantosh has worked as a public works inspector for
inspection of capital improvement and developer installed improvements relating to the construction of water, sewer, streets, drainage, traffic signals, parks and housing tract improvements. Mr. Lantosh has prepared daily inspection reports, developed construction photo logs, assisted with progress and final payment processing, assisted with change order negotiations, verified compliance with contract
documents and approved project submittals, verified public safety compliance, and developed remedial work lists.
Chane Renner, E.I.T.
Assistant Construction Manager
E.I.T. No. 179608
Mr. Renner has over 7 years of
experience working for TKE
Engineering. He has experience in civil
engineering design and construction of
infrastructure projects, including sewer and water
improvements, drainage improvements, transportation
improvements, facilities improvements, and construction methods. Mr. Renner has been responsible for assistance with design of water and sewer plan/profile, lift stations, treatment plant facilities, preliminary design exhibits, and cost estimates.
He has delivered projects for Mission Springs Water District and the Cities of Glendora, Jurupa Valley, Adelanto, Chino, Fontana, Hesperia, Highland, Needles, and Rialto.
3. S U B C O N S U L T A N T
Koury Engineering &
Testing, Inc. (Koury)
has provided quality
assurance and quality control services since 1992. Khoury is a Woman Owned Business focused on geotechnical engineering, construction inspection, and materials testing, serving clients throughout Southern California. Koury has taken pride in its reputation for quality, reliability, and expertise as a family- owned service provider with the in-house resources to meet your most complex construction needs. Koury’s team provides a full range of geotechnical and engineering geology, material testing and special inspection services for all phases of projects.
Our staff consists of highly experienced engineers and
geologists who have worked worldwide on a variety of
geotechnical and environmental projects and soil technicians and inspectors that have multiple certifications and decades of experience.
Koury’s Local Experience:
Δ Paramount Blvd at De Palma St and Fire Station No. 1
Traffic Signal Installation project
Δ Imperial Hwy at Brookshire Ave Barlin project
Δ On-Call City of Norwalk
Δ On-Call City of La Mirada
Δ On-Call City of Hermosa Beach
Koury’s Certifications:
Δ AASHTO
Δ AMRL
Δ ACI
Δ ACE
Δ Caltrans
Δ CCRL
Δ DSA (LEA No. 146)
Δ ICC
Δ MTA
Δ OSHPD
Δ City of Los Angeles
Δ County of Los Angeles
Δ County of San Diego
4. R E S U M E S
Key Personnel resumes are located in the next following pages.
P a g e |10
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
TERRY
RENNER, P.E.,
L.S., Q.S.D.
Pricipal-in-Charge/
Construction
Manager
TKE Engineering, In c .
EDUCATION
BS, Civil Engineering, California
Polytechnic University, Pomona
REGISTRATIONS
P.E (CA) 69984
Qualified SWPPP Developer &
Practitioner #24329
P.L.S. (CA) 9762
CERTIFICATIONS
Caltrans SWPPP Certified QSP/QSD
Training
AFFILIATIONS
Riverside-San Bernardino Counties
Branch, American Society of Civil
Engineers
American Public Works Association
American Council of Engineering
Companies of California
Mr. Renner is the Senior Vice President of TKE and has over 24 years of experience in civil engineering design, plan checking, project management and construction management of both development and public works infrastructure projects, including grading improvements, street and transportation improvements, traffic engineering, drainage improvements, water improvements, sewer improvements, facilities improvements and recreation improvements. He currently provides traffic and transportation engineering services to the cities of Fontana, Calimesa, Upland, Wildomar, Highland, and Adelanto. His experience includes services during pre-project planning, design, plan review, construction management and inspection, along with operations and maintenance. He also has experience conducting traffic studies, specialized access analysis, parking studies, signal operations, signal timing, and traffic control. He has successfully delivered a wide variety of complex and challenging projects and is dedicated to ensuring that the plans produced by TKE continue to exceed industry standards.
DETAILED PROJECT EXPERIENCE
• Sierra Avenue Widening Project, City of Fontana, CA - Mr. Renner provides project and construction management services to the City of Fontana for the Sierra Avenue Widening Project. The project is approximately 1 mile of widening for the City’s primary north south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for water main replacement, Rule 20A and Rule 20B undergrounding work. He is currently responsible for management of utility coordination, right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services. While providing these services to the City, Mr. Renner has represented the City with other agencies, represented engineering with the City’s management personnel and other meetings, managed engineering budgets and project schedules.
• LPP County Line Road Project, City of Yucaipa/Calimesa, CA- Mr. Renner was the project manager for design of the SB1 Local Partnership Program project. This project consists of the preparation of full construction documents including environmental compliance documents, right-of-way acquisition, utility relocations, plans, technical specifications, construction cost estimates (PS&E) and construction support services for the design of four roundabouts, street widening, bicycle lanes, curb and gutter, sidewalk, crosswalks, ADA curb ramps, storm drain, and signing and striping along County Line Road from 4th Street to Bryant Street.
• Zone 3 Improvement Project, City of El Monte, CA – Mr. Renner served as the Resident Engineer. The City of El Monte is requiring treatments to the set of streets in zone three to increase the pavement quality to the full width of the street. The TKE Team is providing a constructability review of the design plans, specifications and cost estimate (PS&E); overseeing construction coordination meetings with the contractor and stakeholders; community outreach in multi-language, project updates, responding to inquiries and concerns through the duration of the pro ject, tracking and processing requests for information, coordinating materials submittals; conducting material/geotechnical testing, providing construction inspection and reporting; schedule tracking; reviewing and recommending approval of contractor payment requests; reviewing, negotiating, and recommending approval of contract change orders; coordinating with utilities and other agencies; assuring contractor labor compliance; and records management.
P a g e |11
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
STEVEN
LEDBETTER,
P.E.
Construction Manager
TKE Engineering, In c .
EDUCATION
BS, Civil Engineering
(Environmental), California State
Polytechnic University, Pomona
REGISTRATIONS
Civil Engineer, P.E. (CA) 84044
AFFILIATIONS
Riverside-San Bernardino Counties
Branch, American of Civil
Engineers
American Public Works
Association
American Council of Engineering
Companies of California
Mr. Ledbetter has over 23 years of professional experience in the civil engineering industry. He has handled various critical and challenging projects from planning through design and implementation; all while ensuring that projects are executed as per specification in the stipulated time with quality. He has a well-rounded background with experience in: preparation and analysis of street and utility improvement plans and specifications including potable and non-potable water, wastewater, and drainage; utility master planning including computer modeling, analysis, and report preparation; water resource planning and management including feasibility studies, urban water management planning, water supply assessments and verifications, integrated regional water management planning, and groundwater management planning; storm water compliance reporting including water quality management plans and storm water pollution prevention plans and; and grant writing and administration for various State and Federal agency programs.
DETAILED PROJECT EXPERIENCE
• 2nd Street Safe Routes to School, City of Calimesa/Yucaipa – Mr. Ledbetter is providing construction management services for the City of Calimesa for the SR2S funded pedestrian path of travel enhancements to provide safer walking paths along 2nd Street between Avenue “L” and Avenue “H” and along Avenue “L” between 2nd Street and 3rd Street. The project includes construction of proposed curb, gutter and sidewalk improvements for increased pedestrian safety. The project includes approximately 1-mile of street improvements together with structural bridge widening over existing drainage channel, right-of-entry acquisition, public outreach and coordination, utility relocation and roundabout construction at the intersection of County Line Road and 2nd Street. Mr. Ledbetter is responsible for grant management with the Caltrans Local Assistance, bidding services, permitting, construction administration and utility coordination.
• Regional Water Reclamation Facility Monitoring Wells, Desert Hot Springs, CA - Mr.
Ledbetter is providing project and construction management services for the design and construction of three new groundwater monitoring wells .The new monitoring wells were part of the waste discharge requirements for a new wastewater treatment plant to develop a more comprehensive understanding of prep and post project groundwater quality. The project includes well siting, well drilling and development, site improvements, monitoring equipment testing and deployment, and groundwater level and quality monitoring. Services include preparation of records research, coordination with agencies and consultants, well siting, cost estimating, environmental coordination, cultural resource monitoring, permitting, bidding, construction management, construction.
• Calimesa Boulevard Pavement Rehabilitation Project, City of Calimesa, CA- Mr.
Ledbetter provided field investigation of existing project limits to identify proposed rehabilitation strategies for street repair, preparation of specifications and preliminary cost estimates. The Calimesa Pavement Rehabilitation project includes rehabilitation of 4,200 linear feet of major arterial road between County Line Road and Sandalwood Drive in the City of Calimesa. The project included Type II Slurry Seal, cold milling, asphalt concrete overlay, signing and striping, and related improvements.
• Calimesa Creek Storm Drainage Improvements, City of Calimesa, CA – Mr. Ledbetter is serving as the Project Engineer, located in the City of Calimesa along County Line Road between the Interstate 10 Freeway and 5th Street. The proposed project is planned to provide bank stabilization and storm water management improvem ents along a 0.6-mile portion of the Calimesa Creek to mitigate erosion and flooding of the earthen channel with undersized street culvert crossings and severely eroded side slopes with near vertical walls and provide 100-year storm protection as well as other important benefits including groundwater recharge of storm water, environmental restoration and enhancement, recreational trails and increased protection to existing developments.
P a g e |12
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
JUSTIN P.
SCHLAEFLI, P.E.,
T.E., P.T.O.E.
Construction Manager
TKE Engineering, In c .
EDUCATION
Bachelor of Science, Civil Engineering,
San Diego State University
Master Of Civil Engineering, Norwich
University
REGISTRATIONS
Professional Traffic Operations
Engineer
IMSA Level II Signal Technician — Field
Certified Fiber Optic Technician
AFFILIATIONS
Former Second Vice President, San
Diego Highway Development
Association
Justin has nearly over 23 years of experience in the transportation field. He is responsible for managing projects on a day-to-day basis as well as interfacing with other project team members and decision makers/ government staff and Contractors. He specializes in Intelligent Transportation Systems, Transportation Planning, Construction, Signal Maintenance, Traffic Engineering and Traffic Operations. He has experience working on both public sector projects as well as private sector development. His experience ranges from construction management and inspection to operations and maintenance. He also has experience conducting traffic studies, specialized access analysis, parking studies, trip generation studies, traffic micro-simulation, signal operations, signal timing, traffic control and design/build of ITS solutions. In addition, Justin has served as a subject matter expert in court, for the State of California and for vendors in the transportation industry. He is also a proud alumnus of San Diego State University where he has served as a guest lecturer and adjunct faculty teaching Transportation Engineering and helping to mentor the next generation in his field. Finally, Justin has overseen design/build projects for signal modification and ITS improvements including projects in Caltrans jurisdiction and involving multi-agency coordination
DETAILED PROJECT EXPERIENCE
• CV Sync Traffic Signal Synchronization - Phase 1&2, City of Palm Desert-Justin serves as the Resident Engineer assisting in oversight of all construction management aspects for Phase 1 and Phase 2 of the CV SYNC project (Formerly CVAG TSSP). This work involves plan review, management and approval of construction scheduling, budget, field work, local agency procedures and more. As the Local Agency Resident Engineer, Justin ensures adherence with applicable State and Federal requirements requiring familiarity with the CAMUTCD, Caltrans Standard Plans, Caltrans Construction Manual, Local Agency Procedures Manual and other applicable standards and documents. This project involves coordination and support across twelve agencies in the Coachella Valley.
• Main Street Synchronization Phase 1 and 2, City of Hesperia- Justin served as the primary project manager for the upgrade of sixteen traffic signals on the Main Street Corridor. This project has been completed in two phases with phase 1 completed and operational since 2018 and phase 2 just completed and in its commissioning phase.
Phase 2 involved substantial coordination across two Agencies, Caltrans and the City of Hesperia with the first synchronization/adaptive configuration across Caltrans freeway interchange ramp signals utilizing the technology selected. The project involved signal upgrades, installation of battery backup systems, CCTV cameras, ATMS cloud configuration, communications upgrades, controller replacements, signal timing, traffic control and more. The main technology vendors were Rhythm Engineering’s InSync system and Trafficware. Additional quality assurance surveys and full project documentation were also provided along with technology training and maintenance planning. Justin has also provided As-Needed ITS services to the city since 2016 with regular maintenance and upgrade oversight of existing systems.
P a g e |13
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
MARVIN LARA,
E.I.T.
Assistant Construction
Manager
TKE Engineering, In c .
EDUCATION
B.S, Civil Engineering, California State
Polytechnic University, Pomona
CERTIFICATIONS
Engineer in Training No. 157100
AFFILIATIONS
Riverside-San Bernardino Counties
Branch, American Society of Civil
Engineers (ASCE)
Inland Empire, Women in
Transportation (WTS)
Cal Poly Pomona Alumni, Society of
Hispanic Professional Engineers
Mr. Lara is an Associate Engineer of TKE and has 7 years of experience in civil engineering infrastructure projects, including transportation improvements, drainage improvements, sewer and water improvements, facilities improvements, recreation improvements, and construction methods. He has managed numerous projects and has delivered projects for the Cities of Highland, Moreno Valley, Glendora, Calimesa, Fontana, Rialto, Hesperia and Redlands. As a Construction Assistant, Mr. Lara has been respo nsible for assistance in supervising a staff of inspectors, construction coordination and scheduling, utility relocation coordination, public relations, submittal review, coordination with subconsultants, weekly progress meetings, request for information r esponses, storm water management, progress payments, change order review and negotiations, labor compliance, and project closeout.
DETAILED PROJECT EXPERIENCE
• CV Sync Construction Management, Palm Desert, CA- Mr. Lara serves as the Assistant Construction Manager assist with oversight of all aspects for Phase 1 and 2 of the CV SYNC project (Formerly CVAG TSSP). This work involves plan review, management and approval of construction scheduling, budget, field work, local agency procedures and more. This project involves coordination and support across twelve agencies in the Coachella Valley The project improvements include advanced traffic management systems (ATMS), advanced transportation controllers (ATC), selected Intelligent Transportation System (ITS) elements, ITS sub -systems, and Ethernet/IP-based communications that will be expandable and scalable for future integration of ITS technologies and strategies, such as Integrated Corridor Management (ICM), Smart Cities, Connected and Autonomous Vehicles, a Regional Traffic Management Center (RTMC) and local Traffic Operation Centers (TOC). • LPP County Line Road Project, City of Yucaipa/Calimesa, CA- Mr. Lara was the Assistant Construction Manager for the SB1 Local Partnership Program project. This project consists of the preparation of full construction documents including environmental compliance documents, right-of-way acquisition, utility relocations, plans, technical specifications, construction cost estimates (PS&E) and construction support services for the design of four roundabouts, street widening, bicycle lanes, curb and gutter, sidewalk, crosswalks, ADA curb ramps, storm drain, and signing and striping along County Line Road from 4th Street to Bryant Street. • Moreno Valley Amphitheater, City of Moreno Valley, CA - Mr. Lara is currently assisting in performing construction management services for the new construction of Moreno Valley Amphitheater located near Moreno Valley City Hall at Southeast corner of Alessandro Boulevard and Veteran’s Way intersection. The project includes construction management, obtaining approval of permit applications, submittal and RFI review, project team coordination, inspections and construction staking. • CDBG Alesia Street and Lerma Avenue, City of South El Monte, CA- Mr. Lara assisted in the design of approximately 107,000 sq. ft of street rehabilitation on Alesia Street between Potrero Avenue and Adelia Avenue and Lerma Street between Merced Avenue and Central Avenue in the City of South El Monte. Proposed design included asphalt rehabilitation, grading, striping and signage improvements sidewalk, and curb access ramps were designed to meet ADA Compliance. • I-15 Sewer and Water Improvements, City of Hesperia, CA - Mr. Lara assisted in the design of approximately 7,900 linear feet of 8” and 10” P.V.C. sewer main improvements. Design of sewer main improvements also included 10” ductile iron pipe with an 18” Steel Casing crossing the I-15 Freeway from Caliente Road to Mariposa Road near Ranchero Road in the City of Hesperia. In addition to sewer main improvements, approximately 3,800 linear feet of 18” DIP water lines were designed along Ranchero Road to and along Kourie Way and to and along Cromdale Street to existing tanks at East end of Cromdale Street. The project included restrained joints, system appurtenances, and connections to the existing systems and interconnections to City of Hesperia Sewer and Water.
P a g e |14
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
CHANCE
RENNER, E.I.T.
Assistant Construction
Manager
TKE Engineering, Inc .
EDUCATION
B.S, Civil Engineering, California State
Polytechnic University, Pomona
CERTIFICATIONS
E.I.T. No. 179608
Mr. Renner has over 7 years of experience working for TKE Engineering. He has experience in civil engineering design and construction of infrastructure projects, including sewer and water improvements, drainage improvements, transportation improvements, facilities improvements, and construction methods. Mr. Renner has been responsible for assistance with design of water and sewer plan/profile, lift stations, treatment plant facilities, preliminary design exhibits, and cost estimates. He has delivered projects for Mission Springs Water District and the Cities of Glendora, Adelanto, Chino, Fontana, Hesperia, Highland, Needles, and Rialto
DETAILED PROJECT EXPERIENCE
• Moreno Valley Civic Center Park & Amphitheater Project, Moreno Valley- Mr. Renner served as the Assistant Engineer. The amphitheater is used for regional movie nights, concerts and seasonal special events. The project infrastructure improvements include a 500-600 seat amphitheater and stage with backdrop, restroom facilities, trash enclosure, electrical, plumbing, audio/visual, pavilion, sidewalks, curbs, gutters, stage lighting, pathway and parking lot lighting, ADA compliant pedestrian ramps, drainage improvements, street improvements, landscaping, and irrigation improvements. • Well No. 16, City of Needles- Mr. Renner assisted with the design and construction of a new production well, Well No. 16, and transmission main located along Balboa Place and South of McShans Lane in the City of Needles. The project includes design of the well pump and motor, above ground discharge piping, appurtenances, 2,750 linear feet of 16” transmission pipeline, shade structure, electrical system, and SCADA system integration. The project includes restrained joints, system appurtenances, and connections to the existing systems and interconnections to City of Needles Water.
• Zone 3 Improvement Project, City of El Monte - Mr. Renner served as an Assistant Construction Manager. The City of El Monte is requiring treatments to the set of streets in zone three to increase the pavement quality to the full width of the street. The TKE Team is providing a constructability review of the design plans, specifications and cost estimate (PS&E); overseeing construction coordination meetings with the contractor and stakeholders; community outreach in multi-language, project updates, responding to inquiries and concerns through the duration of the project, tracking and processing requests for information, coordinating materials submittals; conducting material/geotechnical testing, providing construction inspection and reporting; schedule tracking; reviewing and recommending approval of contractor payment requests; reviewing, negotiating, and recommending approval of contract change orders; coordinating with utilities and other agencies; assuring contractor labor compliance; and records management. • Palomar/ Clinton Keith Sidewalk, Trail, and Bike Lane Connectivity Project, City of Wildomar- Mr. Renner served as the Assistant Engineer. A grant funded project located along Palomar Street from Clinton Keith Road to Meadow Ridge Lane and along Clinton Keith Road from Renaissance Plaza to Hidden Springs Road in the City of Wildomar. The project included approximately one mile of sidewalk connectivity, ultimate street widening, storm drain, striping, and private property restoration that required full depth removal and placement of AC pavement; removal and reconstruction of concrete curbs and gutters, ADA ramps, cross-gutters, sidewalks; construction of concrete sidewalks, curbs and gutters, cross-gutters, ADA ramps, and driveway approaches; construction of CMU retaining wall and significant regrading along hillsides; construction of a multipurpose DG Trail; construction of catch basins, rock bioswales, headwalls, and storm drains; installation of a new pedestrian push button system and curb ramp at the intersection of Clinton Keith Road and Renaissance Plaza; relocation of miscellaneous utilities; raising of various utility manholes/valves and installation of traffic signing, striping and loop detectors .
P a g e |15
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
BRAD ENSCOE
Senior Public Works
Inspector
TKE Engineering, In c .
CERTIFICATIONS
OSHA 30 Certified
16 Hour QSP Training Seminar
APWA, Construction Inspection
March 2010
CMAA, Construction Inspection for
Public Works March 2010
Public Works Inspector Level 1 Testing
AFFILIATIONS
APWA, Construction Inspection
CMAA, Construction Inspection for
Public Works
Public Works Inspector Level 1 Testing
Mr. Enscoe has over 18 years of experience providing public works construction inspection services. Recently, Mr. Enscoe is providing on-call inspection services to the City of Calimesa for developer installed housing projects as well as street, drainage, and sewer improvements to the Cities of Fontana, Redlands, and El Monte. In addition to daily inspection services, Mr. Enscoe has prepared daily inspection reports, developed construction photo logs, assisted with progress and final payment processing, assisted with change order negotiations, verified compliance with contract documents and approved project submittals, verified public safety compliance, developed remedial work list and system startup inspections. In addition, Mr. Enscoe has provided coordination with other project professional services (e.g., Geotechnical and Surveying).
DETAILED PROJECT EXPERIENCE
• On-Call Inspection Services, City of Calimesa– Mr. Enscoe is providing on-call inspection services to the City of Calimesa on numerous public and private improvements related to housing tracts and commercial development projects, as well as utility construction projects, and capital improvement projects throughout the City.
• On-Call Inspection Services, City of Menifee– Mr. Enscoe provided on-call inspection services to the City of Menifee on public and private improvements for more than 90 development project related to housing tracts and commercial development, as well as utility construction projects, and capital improvement projects throughout the City.
• San Bernardino Avenue Street Improvements, County of San Bernardino– Mr.
Enscoe performed construction inspection services for this 8,800 linear feet of street median, sidewalk, traffic signal and storm drain improvements. This project included coordination with Union Pacific Railroad, the City of Fontana and compliance with requirements of a wide variety of funding sources to construct ultimate street widening improvements including median, curb and gutter, sidewalk, landscaping, traffic signal modification, striping, storm drain and sewer crossings and private onsite improvements. The project included right-of-way acquisition for eight parcels.
• Zone 3 Improvement Project, City of El Monte Mr. Enscoe served as the Senior Public Works Inspector for the Zone 3 Improvement project. The City of El Monte is requiring treatments to the set of streets in zone three to increase the pavement quality to the full width of the street. The TKE Team is p roviding a constructability review of the design plans, specifications and cost estimate (PS&E); overseeing construction coordination meetings with the contractor and stakeholders; community outreach in multi-language, project updates, responding to inquiries and concerns through the duration of the project, tracking and processing requests for information, coordinating materials submittals; conducting material/geotechnical testing, providing construction inspection and reporting; schedule tracking; reviewing and recommending approval of contractor payment requests; reviewing, negotiating, and recommending approval of contract change orders; coordinating with utilities and other agencies; assuring contractor labor compliance; and records management.
• San Bernardino Avenue Median and Traffic Signal Improvements , City of Fontana- Mr. Enscoe performed construction inspection services for installation of a new traffic signal and approximately 300 linear feet of median improvements on San Bernardino Avenue located in the City of Fontana north of Interstate 10 Freeway and East of the Interstate 15 Freeway near Commerce Drive. This projects proposed median and traffic signal improvements were constructed to provide a centralized turning procedure for the Walmart Distribution facility with nearly 1,000 turning movements per day. The project provides for increased vehicular capacity, corridor beautification, and improved traffic and pedestrian safety.
P a g e |16
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
JEFFREY
LANTOSH
Senior Public Works
Inspector
TKE Engineering, Inc .
EDUCATION
South West Calibration and Training,
San Bernardino, CA
CERIFICATIONS
CPII – Certified Public Infrastructure
Inspector
ICC - Special Inspector, Soils
Structural Masonry, Reinforced
Concrete, and Prestressed Concrete
(Cert No. 8052427)
American Concrete Institute -
Certification Staff
OSHA 30 Outreach Training for the
Construction Industry 2022:
construction#: 20-0107970 General#:
20-0079854
APNGA Portable Nuclear Gauge |
Radiation Safety Officer Class
South Coast Air Quality Management
District | Rule 403.1 Coachella Valley
Fugitive Dust Control Training
(CV2302‐010555‐13615)
Mr. Lantosh has over 12 years of inspection experience with the providing public works inspection services. Mr. Lantosh has provided inspection services to several municipalities throughout Southern California. He has completed project inspection services for the cities of Fontana, Riverside, Moreno Valley, Highland, Calimesa, Riverside Transit Agency, and the County of San Bernardino. Mr. Lantosh’s background in public works inspection and oversight provide him with an extensive knowledge of ASTM specifications and OSHA standards.
Additionally, Mr. Lantosh has provided coordination with other project professional services including geotechnical and survey. Mr. Lantosh has worked as a public works inspector for inspection of capital improvement and developer installed improvements relating to the construction of water, sewer, streets, drainage, traffic signals, parks and housing tract improvements. Mr. Lantosh has prepared daily inspection reports, developed construction photo logs, assisted with progress and final payment processing, assisted with change order negotiations, verified compliance with contract documents and approved project submittals, verified public safety compliance, and developed remedial work lists.
DETAILED PROJECT EXPERIENCE
• Citywide Pavement Rehabilitation Program (Local Streets) FY 2020/21 Project, City of Moreno Valley- Mr. Lantosh was the Senior Public Works Inspector for the Citywide Pavement Rehabilitation Program for FY 2020/21 Project which included rehabilitation for 2.4 miles along various local streets throughout the City of Moreno Valley. TKE provided daily inspection and monitoring to ensure construction of the project was in accordance with the approved plans and specifications. The project included pavement crack sealing, grinding and isolated removal areas along with construction of street widening with asphalt rubberized hot mix overlay over conventional hot mix asphalt base paving, pavement replacement, rubberized asphalt concrete overlay, slurry seal and asphalt concrete curb installation.
• Pavement Accelerated Repair Implementation Strategy (PARIS) Program, City of Redlands- Mr. Lantosh performed observation and testing on over 400 miles of roads throughout the City. This project entailed grinding and recycling existing pavement, creating a new base layer for asphalt. The City of Redlands features unique challenges, as the soil varies from silty sands on its north side to clayey material to the south. With this, the City heavily relied on field recommendations to ensure a firm and unyielding section to place asphalt. Some recommendations included cement treated soils and/or the use of geogrid. Good faith effort was used to provide value engineering to the City. This project changed the City’s pavement rating from one of the lowest to one of the highest in the state.
• Ellis Ave. Water Main Replacement, – Mr. Lantosh performed observation and testing of soils and reinforced concrete for new CMLC water main on Ellis Ave. and Post Rd. Under the direction of EMWD inspection staff, Mr. Lantosh observed and tested trench backfills, AC paving, and site grading per District standards. Upon completion of site grading, Mr.
Lantosh performed reinforced concrete inspections for structures inside the new pump station on Post Rd. All non-conforming work was brought to the immediate attention of the contractor and corrected to contract specifications. As an extension of their team, • Regional Conveyance Force Main and Trunk Sewer, Mission Springs Water District – Mr.
Lantosh served as an Inspector for the Regional Conveyance Force Main and Trunk Sewer.
Mission Springs Water District (MSWD) retained TKE to conduct a preliminary engineering analysis that evaluated potential service areas, trunk sewer/force main alignments, wastewater flow rates, lift station capacity analysis, and other preliminary design criteria needed to identify the preferred alignment of the Regional Conveyance Force Main and Trunk Sewer and potential flow diversions to the Regional Water Reclamation Facility (RWRF). TKE is also responsible for final design and contract documents for approximately 3 miles of the preferred Regional Conveyance Force Main and Trunk Sewer alignment from the intersection of Dillon Road and Avenida Manzana to the RWRF. The project includes environmental compliance and geotechnical investigation, along with coordination with developers, other agencies, Regional Water Quality Control Board, and other consultants.
P a g e |17
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION C | ORGANIZATIONAL CHART, KEY PERSONNEL &
SUBCONSULTANT
NELSON
BLACKWELL
Senior Public Works
Inspector
TKE Engineering, Inc .
EDUCATION
Special Inspection Certification and
Training - Southwest Training and
Calibration San Bernardino, Ca
CERIFICATIONS
ICC - Special Inspector, Soils,
Reinforced Concrete, Reinforced
Masonry and ACI Field Testing
Technician Grade 1
CPII – Certified Public Infrastructure
Inspector (CPII)
Mr. Blackwell has over 8 years of experience providing inspection services for capital projects to several agencies throughout Southern California. His services include but are not limited to site grading, sewer and waterline installation, street paving, American Disabilities Act (ADA) improvements, underground infrastructure, utilities installation, steel reinforcements, concrete and masonry, path/retaining walls, and parking lot installation. Additionally, he is skilled in understanding project plans and specifications, accessing applicable code, maintaining good and proper relationships with project stakeholders and contractors, and helping to prepare final project documents. Mr.
Blackwell has prepared daily inspection reports, developed construction phot o logs, verified compliance with contract documents and approved project submittals, and verified public safety compliance.
DETAILED PROJECT EXPERIENCE
• Citywide Pavement Rehabilitation Program (Arterial Streets) FY 2021/22 Project, City of Moreno Valley- Mr. Lantosh was the Senior Public Works Inspector for the Citywide Pavement Rehabilitation Program for FY 2021/22 Project which included rehabilitation for 19 miles along various arterial streets throughout the City of Moreno Valley. TKE provided daily inspection and monitoring to ensure construction of the project was in accordance with the approved plans and specifications. The project included pavement crack sealing, grinding and isolated removal areas along with construction of street widening with as phalt rubberized hot mix overlay over conventional hot mix asphalt base paving, pavement replacement, rubberized asphalt concrete overlay, slurry seal and asphalt concrete curb installation.
• Pavement Accelerated Repair Implementation Strategy (PARIS) Program, City of Redlands- Mr. Lantosh performed observation and testing on over 400 miles of roads throughout the City. This project entailed grinding and recycling existing pavement, creating a new base layer for asphalt. The City of Redlands features unique challenges, as the soil varies from silty sands on its north side to clayey material to the south. With this, the City heavily relied on field recommendations to ensure a firm and unyielding section to place asphalt. Some recommendations included cement treated soils and/or the use of geogrid. Good faith effort was used to provide value engineering to the City. This project changed the City’s pavement rating from one of the lowest to one of the highest in the state. • Regional Water Reclamation Facility Monitoring Wells, Desert Hot Springs, CA - Mr. Blackwell is providing project and construction management inspection services for the design and construction of three new groundwater monitoring wells in the City of Desert Hot Springs. The new monitoring wells were part of the waste discharge requirements for a new wastewater treatment plant to develop a more comprehensive understanding of prep and post project groundwater quality.
The project includes well siting, well drilling and development, site improvements, monitoring equipment testing and deployment, and groundwater level and quality monitoring. Services include preparation of records research, coordination with agencies and consultants, well siting, cost estimating, environmental coordination, cultural resource monitoring, permitting, bidding, construction management, construction.
• Boulder Ave Improvement Project, City of Highland – Mr. Blackwell was the Senior Public Works Inspector for Boulder Avenue Improvement Project, a major collector street with 2 lanes each direction separated by a median. The project included removal of curb, gutter, asphalt concrete pavement, signage, striping and construction of PCC curbs, gutters, curb ramps, driveways, asphalt concrete pavement, irrigation, median curb, landscaping, hardscape, in-road bicycle detection, decorative way findings signs, street lighting, trail lighting, anti -graffiti coating, architectural treatment on existing sound wall and cape seal located on Boulder Avenue from Greenspot Road to San Manual Village Plaza (Highland Avenue).
P a g e | 18
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION D | RECENT PROJE C T EXPERIENCE
SECTION D | RECENT PROJECT EXPERIENCE
TKE takes pride in our reputation for thoroughness, rapid turnaround, cost efficiency and overall quality of work, and believes that a high level of quality is needed for construction management and inspection of all Projects in order to protect the City’s i nterest, enforce the contract documents and minimize change orders. The following project examples showcase our team’s experience in performing work of a similar nature to the scope provided in the RF Q. This experience highlights a few of our recent projects and we encourage you to contact the references associated with each of them.
ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION EXPERIENCE
S T R E E T I M PRO V E M E N T P R O J E C T S
COUNTY LINE ROAD TRANSPORTATION CORRIDOR (LPP)
City of Calimesa, CA
Client Contact: Will Kolbow | City Manager
Phone Number: (909) 795-9801
Email: [email protected]
Project Cost: $10.1 M ($3.7 M Grant)
Completion Date: Current
DESCRIPTION
TKE prepared and obtained a grant for the City of Calimesa through the Road Repair and Accountability Act of 2017 (SB1) Local Partnership Program (LPP). TKE is preparing street widening and roundabout improvements for the construction of the County Line Road Transportation Corridor. The Project includes four (4) single-lane and one (1) multi-lane roundabouts, together with street, pedestrian, and bicycle improvements, to improve safety and efficiency throughout the corridor. The innovative approach to implement roundabout intersection throughout the corridor provides adequate capacity and level of service to remain a two -lane street; thus, significantly reducing right-of-way and construction costs to construct a four-lane corridor.
SERVICES
Services include grant coordination and management, design, topographic survey, right-of-way engineering, environmental assistance, roadway safety analysis, preparation of exhibits, cost estimates, coordination with California Transportation Commission, construction management, inspection, and construction staking.
KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Steven Ledbetter, P.E., Octavio Parada, Ron Musser, L.S., Monae Pugh, Justin Schlaefli, P.E., T.E., P.T.O.E. Jeff Lantosh, C.P.I.I., Brian McDuffie
SIERRA AVENUE WIDENING PROJECT
City of Fontana, CA
Client Contact: Phillip Burum | City Manager
Phone Number: (909) 350-6727
Email: [email protected]
Project Cost: $11.3 M
Completion Date: Current
DESCRIPTION
The Sierra Avenue widening improvements project is located in the City of Fontana north of Interstate 10 Freeway between Foot hill Boulevard and Baseline Road. The project is approximately 1 mile of widening for the City’s primary north-south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for wat er main replacement, Rule 20A and Rule 20B undergrounding work. The project also includes right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services. TKE represents the City with other agencies, represented engineering with the City’s management personnel and other meetings, managed engineering budgets and project schedules.
SERVICES
Services include design, topographic survey, right-of-way engineering and acquisition, roadway safety analysis, preparation of exhibits, cost estimates, utility coordination, construction management, and construction staking..
KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Steven Ledbetter, P.E., Octavio Parada, Ron Musser, L.S., Monae Pugh
RELEVANCE TO DOWNEY
• LPP State Grant Management
• Roundabouts Design
• Right -of-Way Acquisition
• Extensive Utility Relocations
• Major Arterial Reconstruction
• Various Pavement Strategies
• Extensive Utility Coordination
and Permitting
RELEVANCE TO DOWNEY
• Major Arterial Roadway Widening
• Traffic Signal
Modification/Design
• Sewer Design
• Right -of-Way Acquisition
• Extensive Utility Relocations
• Various Pavement Strategie s
P a g e | 19
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION D | RECENT PROJE C T EXPERIENCE
P A V E M E N T R E H A B I L I T A I O N P R O J E C T S ZONE 3 IMPROVEMENT PROJECT
City of El Monte, CA
Client Contact: John Rico
Phone Number: (626) 258-8833
Email: [email protected]
Project Cost: $5.2M
Completion Date: Current
DESCRIPTION
The City of El Monte is requiring treatments to the set of streets in zone three to increase the pavement quality to the full width of the street.
The TKE Team is providing a constructability review of the design plans, specifications and cost estimate (PS&E); overseeing construction coordination meetings with the contractor and stakeholders; community outreach in multi-language, project updates, responding to inquiries and concerns through the duration of the project, tracking and processing requests for information, coordinating materials su bmittals; conducting material/geotechnical testing, providing construction inspection and reporting; schedule tracking; reviewing and recommending approval of contractor payment requests; reviewing, negotiating, and recommending approval of contract change orders; coordin ating with utilities and other agencies; assuring contractor labor compliance; and records management.
SERVICES
Services include constructability review, construction coordination, construction management, construction inspection and reporting, public outreach, labor compliance, survey, construction phasing, and traffic signing and striping inspection
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D., Brad Enscoe, Marvin Lara, E.I.T., Brian Wolfe, P. E
CITYWIDE PAVEMENT REHABILITATION PROGRAM (ARTERIALS) FY 2021/22 City of Moreno Valley, CA
Client Contact: Eddie Godinez
Phone Number: (951) 218-8646
Email: [email protected]
Project Cost: $18M
Completion Date: November 2023
DESCRIPTION
The Citywide Pavement Rehabilitation Program for FY 2021/22 Project included rehabilitation for 20 miles along various streets throughout the City of Moreno Valley. TKE provided daily inspection and monitoring to ensure construction of the project was in accordance with the approved plans and specifications. The project included pavement crack sealing, grinding and isolated removal areas along with co nstruction of street widening with asphalt rubberized hot mix overlay over conventional hot mix asphalt base paving, pavement replacement, rubberi zed asphalt concrete overlay, slurry seal and asphalt concrete curb installation. TKE provided preparation of daily field reports and photo logs and provided reports to the City Staff on weekly basis.
SERVICES
Services included review and monitoring of Contractor’s daily traffic control, storm water pollution prevention measures and safety procedures, daily oversight and inspection, report preparation, photo log preparation and verification of quantities for payment requests.
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D., Bob Doss, P.E., Nelson Blackwell, C.P.I.I., Brad Escoe, Naeem Dulloo
RELEVANCE TO DOWNEY
• Project/Construction Management
• Construction Inspection
• Street Improvement Project
• Survey
• Community Outreach Efforts
RELEVANCE TO DOWNEY
• City of Moreno Valley Experience
• Various Pavement Rehabilitation
Strategies
• Arterial Roadway Construction and Traffic
Control
• Permitting and Private Residents and
Business Coordination
P a g e | 20
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION D | RECENT PROJE C T EXPERIENCE
T R A F F I C I M P R O V E M E N T P R O J E C T S
CV SYNC – PHASE I
Coachella Valley Association of Governments (CVAG), Coachella Valley, CA
Client Contact: Eric Cowle
Phone Number: (760)346-1127
Email: [email protected]
Project Cost: $21M
Completion Date: November 2023
DESCRIPTION
Phase I of this project located in the Coachella Valley consists of upgrading the local agencies existing legacy (outdated) traffic signal controllers, traffic management systems, and communication systems with the latest off-the-shelf technologies in order to provide inter-agency traffic signal synchronization along three regional roadways for over 120 intersections. The project improvements include advanced traffic management systems (ATMS), advanced transportation controllers (ATC), selected Intelligent Transportation System (ITS) elements, ITS sub -systems, and Ethernet/IP-based communications that will be expandable and scalable for future integration of ITS technologies and strategies. This project includes a Regional Traffic Management Center (RTMC) and local Traffic Operation Centers (TOC) that will have the capability to monitor, control of connected traffic signals, and be used as a monitoring tool for research and analysis to help determine regional system enhancements, operations, and maintenance.
SERVICES
Services included bid administration and pre-construction assistance, grant funding administration, construction management, inspection, and project closeout services
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D, Justin Schlaefli, P.E., T.E., P.T.O.E., Marvin Lara, E.I.T., Stephen Biscotti, Michael Counce Tony Tran, Jeff Lynn CV SYNC – PHASE II
Coachella Valley Association of Governments (CVAG), Coachella Valley, CA
Client Contact: Eric Cowle
Phone Number: (760)346-1127
Email: [email protected]
Project Cost: $93M
Completion Date: Current
DESCRIPTIO N
Phase II of this project located in the Coachella Valley consists of upgrading the local agencies existing legacy (outdated) traffic signal controllers, traffic management systems, and communication systems with the latest off-the-shelf technologies in order to provide inter-agency traffic signal synchronization along eight regional roadways for more than 500 intersections. The project improvements include advanced traffic management systems (ATMS), advanced transportation controllers (ATC), selected Intelligent Transportation System (ITS) elements, ITS sub -systems, and Ethernet/IP-based communications that will be expandable and scalable for future integration of ITS technologies and strategies. This project includes a Regional Traffic Management Center (RTMC) and local Traffic Operation Centers (TOC) that will have the capability to monitor, control of connected traffic signals, and be used as a monitoring tool for research and analysis to help determine regional system enhancements, operations, and maintenance.
SERVICES
Services included bid administration and pre-construction assistance, grant funding administration, construction management, inspection, and project closeout services
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D, Justin Schlaefli, P.E., T.E., P.T.O.E., Marvin Lara, E.I.T., Stephen Biscotti, Michael Counce Tony Tran, Jeff Lynn
RELEVANCE TO DOWNEY
• Public Works Construction
Management Inspection Project
• Traffic Signal, Synchronization
and Special Inspections
• Electrical Inspections
• State and Federal Grant
Management
RELEVANCE TO DOWNEY
• Public Works Constructio n
Management Inspection Project
• Traffic Signal, Synchronization
and Special Inspections
• Electrical Inspections
• State and Federal Grant
Management
P a g e | 21
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION D | RECENT PROJE C T EXPERIENCE
W A T E R I M P R O V E M E N T P R O J E C T S
RECYCLED WATER PIPELINE
City of Hesperia, CA
Client Contact: Nils Bentsen
Phone Number: (760) 947-1025
Email: [email protected]
Project Cost: $16M
Completion Date: December 2018
DESCRIPTION
TKE prepared engineering construction documents for the City of Hesperia for construction of 8 miles of recycled water pipelines ranging for 16” to 8” in diameter including, plan and profiles, specifications, cost estimates, and DWR funding management. In addition, TKE is providing construction assistance services, grant funding management and inspection for pipeline construction
SERVICES
Services include records research, planning, system modeling, hydraulic analysis, hydraulic modeling, report and cost estimat e preparation, construction document preparation, utility coordination, right-of-way acquisition, cost estimation, construction assistance, inspection and grant fund management assistance.
KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, L.S, Stephen Biscotti
RPU MAGNOLIA AVENUE TECHITE REPLACEMENT PROJECT
Riverside Public Utilities, City of Riverside, CA
Client Contact: Mr. Eric Escobar
Phone Number: (951) 826-5821
Email: [email protected]
Project Cost: $5M
Completion Date: October 2021
DESCRIPTION
Magnolia Avenue Techite Replacement project involved the installation of 42” CML&C Pipe in Magnolia Avenue of Riverside working both day and night. We inspected the pipe layout (path of travel), cutting of asphalt for trench, trenching, 42” CML&C installation, c oncrete diapering of external pipe joints, backfill operations, asphalt pavement restoration, concrete restoration, interior pipe joint weld inspection, interior pipe joint grouting including advising where only grout needed vs. mesh and grout placement depending on interior joint width, Pressure Testing 42” CML&C Pipeline, and setting grind and asphalt restoration limits, and re striping of streets. We also inspected the Temporary Construction Yard set up, SWPPPs at Temp Construction Yard as well as around the 3,000’ pipeline project, and the restoration of area after Temporary Construction Yard removal. This included Drive Approach and sidewalk installation work to restore location after Temp Construction Yard. T KE helped pick location of Drive Approach, then inspected the removal, compaction, forming, pouring, and floating of Drive Approach.
SERVICES
Services include water main installation, water service installation, fire hydrant, air vacuum release valve and blowoff inst allation, pre- construction and progress meetings, daily inspection reports, developed construction photo logs, verified public safe ty compliance, and coordination with agencies/utilities.
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D, Stephen Biscotti
RELEVANCE TO DOWNEY
• Recycled Water Design, construction
management and inspection
• Utility Relocation/Coordination
• Design/Construction Surveying
• Right-of-Way Engineering
• Easement Acquisition/Property Owner
Coordination Grading and Drainage
• Inspection Experience
RELEVANCE TO DOWNEY
• Public Works Construction
Inspection
• Special Inspections
• Electrical Inspections
• Sensitive Demolition
• Welding Inspection
P a g e | 22
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION D | RECENT PROJE C T EXPERIENCE
S E W E R I M P R O V E M E N T P R O J E C T S
REGIONAL WATER RECLAMATION PROGRAM MANAGEMENT
Mission Springs Water District, City of Desert Hot Springs, CA
Client Contact: Arden Wallum
Phone Number: (760) 329-5169
Email: [email protected]
Project Cost: $68M
Completion Date: Current
DESCRIPTION
Mission Springs Water District (MSWD) retained TKE to prepare a preliminary engineering analysis that evaluated expanding an existing WWTP or building a new regional WWTP. Ultimately, MSWD selected to proceed with a new regional WWTP, the Regional Water Reclamation Facility (RWRF). Thereafter, TKE was retained to be the program manager for the for the development of the RWRF and associated projects. As program manager, TKE is responsible for coordinating the design, hydrogeological analysis, environmental compliance processing, and construction of the RWRF, a new Regional Conveyance Trunk Sewer to deliver wastewater to the RWRF, and the M-2 Collection System to connect 695 parcels to the sewer system for treatment by the RWRF. In addition, TKE is in charge of grant funding and permit acquisition. In 2022, TKE secured $68 million in grant funding for the project. The project includes coordination with the State Water Resource Control Board, Regional Water Quality Control Board, Air Quality Management District, other agencies, and other consultants.
SERVICES
Services include preliminary engineering, benefit-cost analysis, project planning and scoping, Board report preparation and presentations, prepare grant funding applications and management, preparation of wastewater flow projection report, technical report and design review, prepare RFPs, environmental compliance services, prepare right-of-way acquisition documents, provided program/project management, regulatory and stakeholder meetings and presentations, perform construction management and inspection.
KEY STAFF
Steven Ledbetter, P.E., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, L.S., Shelby Kelley, Jeff Lantosh, Michael Counce
REGIONAL CONVEYANCE FORCE MAIN AND TRUCK SEWER
Mission Springs Water District, City of Desert Hot Springs, CA
Client Contact: Arden Wallum
Phone Number: (760) 329-5169
Email: [email protected]
Project Cost: $9M
Completion Date: July 2022
DESCRIPTION
Mission Springs Water District (MSWD) retained TKE to conduct a preliminary engineering analysis that evaluated potential service areas, trunk sewer/force main alignments, wastewater flow rates, lift station capacity analysis, and other preliminary design criteria needed to identify the preferred alignment of the Regional Conveyance Force Main and Trunk Sewer and potential flow diversions to the Regional Water Reclamation Facility (RWRF). TKE is also responsible for final design and contract documents for approximately 3 miles of the preferred Regional Conveyance Force Main and Trunk Sewer alignment from the intersection of Dillon Road and Avenida Manzana to the RWRF. The project inclu des environmental compliance and geotechnical investigation, along with coordination with developers, other agencies, Regional Water Quality Control Board, and other consultants. .
SERVICES
Services include Preliminary Engineering, Opinion of Probable Cost, Planning System Alternatives, Sewer Hydraulic Modeling Analysis, Design, Topographic Surveying, and Preparation of Plans, Specifications, and Estimates, Construction Management, Inspection and Construction Staking.
KEY STAFF
Terry Renner, P.E., L.S., Q.S.D., Steven Ledbetter, P.E., Octavio Parada, Ron Musser, L.S., Brad Enscoe, Jeff Lantosh
RELEVANCE TO DOWNEY
• Management of the Program from Inception to
Date
• Program Sequencing
• Value Engineering
• Managing CEQA Compliance
• Managing Permitting
• SRF and Grant Acquisition and Administration
• Hydraulics/Hydrology Modeling
•
RELEVANCE TO DOWNEY
• Construction Management and Inspection
Experience
• Sewer Design
• Project Sequencing
• Managing CEQA Compliance
• RCTD Permitting
• Coordination with City, County, RWQCB, and
State Water Board
• Coordination with City, County, RWQCB,
and State Water Board
• SRF and Grant Acquisition and
Administration
• Hydraulics/Hydrology Modeling
•
P a g e | 23
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION E | CLIENT REFERENCES
SECTION E | CLIENT REFERENCES
Please see the Table below for a small, but representative list of agencies who have and continue to request TKE to assist them in delivering valuable projects to their communities. We respectfully request that you verify our qualifications with the liste d references.
AGENCY CONTACT NAME CONTACT INFO DATES OF
SERVICE
City of Upland
1370 N. Benson Avenue
Upland, Ca 91786
Bob Critchfield
Engineering Manager
P: (909) 291-2946
[email protected] 2000 – Present
City of Glendora
116 E Foothill Boulevard
Glendora Ca, 91741
Mr. Bill Wittkopf
Public Works Director
P: (626) 914-8246
[email protected] 2014 – Present
City of Fontana
16489 Orange Way
Fontana, Ca 92335
Mr. Phil Burum
Deputy City Manager
P: (909) 350-6727
[email protected] 2000 – Present
San Bernardino Municipal Water
Department
1350 S E Street
San Bernardino, Ca 92408
Mr. Ted Brunson
Water Utility Director
P: (909) 684-7580
[email protected]
2003 – Present
City of Calimesa
908 Park Avenue
Calimesa, Ca 92320
Mr. Will Kolbow
City Manager
P: (909) 795-9801
[email protected] 2012 – Present
City of Highland
27225 Baseline
Highland, Ca 92346
Mr. Carlos Zamano
Public Works Director
P: (909) 864-6861
[email protected] 2014 – Present
City of El Monte
11333 Valley Boulevard
El Monte, Ca 91731
Mr. Lee Torres
City Engineer
P: (626) 580-2055
[email protected] 2009– Present
P a g e | 24
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION E | CLIENT REFERENCES
SECTION F | FEE SCHEDULE
P a g e | 25
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION H | ADDITIONAL INFORMATION
SECTION G | PROJECT
MANAGEMENT & METHODOLOGY
1 S T A T E M E N T O F
U N D E R S T A N D I N G
The City desires to retain a highly qualified construction management, inspection and materials testing consultant to provide construction management, inspection and testing services for CIP and permit projects. TKE recognizes the City’s need for construction management and inspection services to support a combination of CIP projects, including: roadway pavement rehabilitation and/or restoration, streetscape, landscaping, and irrigation systems, utility, bridges, safety lighting, traffic signal, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks, general facilities (chain-link fencing/gates, retaining walls, etc.) and other Public Works construction projects. TKE staff is prepared to immediately mobilize and begin providing the required services and related technical engineering assistance including but not limited to the following:
Δ Maintaining orderly project records
Δ Scheduling/conducting job meetings
Δ Weekly progress report submittals
Δ Permit compliance verification
Δ Construction project coordination
Δ Inspect development improvements/project or
encroachment permits to assure work is constructed
as designed
Δ Attend construction progress meetings
Δ Record and provide photographic records
Δ Problem identification/solution determination
TKE Team staff will demonstrate proactive communication strategies to keep the City informed about plan check status updates and any potential issues that may arise. We will be readily available on a daily basis to provide these necessary updates to the City’s Project Engineers prior to returning the plan check to the developer or its representative.
2 P R O J E C T A P P R O A C H
Whether the services required are traffic, transportation, pavement, rehabilitation, water, sew or drainage related, successful project delivery is our goal. Our definition of successful project delivery is:
Δ Project Completion that Protects City Interests
Δ Project Completion that Meets All Project
Requirements
Δ Project Completion on Schedule
Δ Project Completion within Budget
I M P L E M A T I O N P L A N
TKE’s implementation plan includes the following key elements which we routinely provide for each of our projects:
Our approach to the City’s projects, recognizing that both cost effectiveness and expedited construction are of primary concern, dictates that very close working partnership between the selected consultant and the City is vital to successful project completion. When this is coupled with the various site constraints, it is critical that the City choose a construction management team with a proven track record of delivering construction projects. With a familiar team of senior level design and construction professionals, TKE is the right choice for this project.
As mentioned above, our experience tells us that there must be a proactive approach to completing the work in order to complete a cost effective, fully functioning public works project.
This approach includes early identification of critical elements, and development of project schedule and tasks.
Critical elements for construction projects include project management, value engineering, cost control, dispute
resolution, standards compliance, ADA compliance, traffic control, and site safety.
The most important key to every public works project is management. TKE, working closely with City staff, will ensure that the project is managed properly to expedite project delivery. Project construction efforts will generate a series of considerations requiring City responses. Our close working partnership will lead to the proper decisions and ultimately fully operating, cost effective public works improvements.
TKE also understands the limits on the City’s budget,
particularly funding. Because of the limited budget for City projects, it is vital to keep costs controlled. Our approach to controlling costs is to utilize our team’s considerable experience with design and construction to assist in providing
constructability reviews and identify issues prior to being constructed to help reduce the potential for unnecessary change orders.
V A L U E E N G I N E E R I N G
TKE’s construction manager and inspectors are highly skilled at understanding pavement rehabilitation strategies. Our
construction staff will walk the existing project limits to determine if the proposed pavement rehabilitation strategies are appropriate. With our expertise in pavement management, our staff has already been able to recommend pavement
rehabilitation strategy modifications which have saved close to $1 million on a current Citywide Pavement Rehabilitation Project for Arterials and Collectors. TKE will assess each street and the current rehabilitation strategy to determine if modifications will allow the City for additional cost savings
P a g e | 26
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION H | ADDITIONAL INFORMATION
while maintaining appropriate rehabilitation strategies for the street conditions.
A D A C O M P L I A N C E
ADA compliance for curb ramp construction includes an
extensive check list of items from the California Building Code Chapter 11B Divisions 4 and 7. These divisions include requirements for slopes, ramp widths, landing areas, counter slopes, clear space and detectable warning surfaces. TKE’s inspectors are extremely well versed in the requirements set forth in the CBC Chapter 11B for ramp construction and will be able to ensure ramps are fully ADA compliant after constructed.
In addition, for ramp construction, transitions to existing improvements are typically another challenging component, especially in developed areas where private improvements have been constructed. TKE will review all corners and identify impacts early during value engineering and will develop an action plan for working with properties that may be impacted.
TKE will ensure ramp construction will fully comply with ADA requirements.
S T R I C T C O N S T R U C T I O N C O M P L I A N C E In order to ensure cost controls and maintain project budgets, it is imperative that the City employ an experienced
construction management, inspection and materials testing team. Our team has consistently delivered projects on -time and within budget by maintaining an active dialogue and hands on approach with the project contractor, while ensuring that all construction is consistent with the bid plans and specifications.
We are familiar with applicable standards and specifications, including but not limited to numerous cities throughout Los Angeles County and Greenbook.
D I S P U T E R E S O L U T I O N
TKE’s construction managers are highly skilled with and has provided dispute resolution on a number of past projects. The keys to avoiding potential costly and time-consuming disputes are knowledge, communication and organization. Our
construction managers pride themselves on thorough research and review of the project plans and specifications and their existing knowledge and understanding of Caltrans, Greenbook and other standard plans and specifications. Our effective communications skills ensure that all stakeholders are
constantly advised of project progress and requirements. Our proactive organizational program effectively manages the construction schedule, documents action items with required follow-up and continuous schedule reviews and anticipate needs for future action items. Our project manager’s ‘can do’ approach to all project issues nearly always results in resolution. They are non-combative with all project
stakeholders, maintaining professional working relationships with each stakeholder regardless of conflict. Their
perseverance and vast knowledge and experience of issues will resolve challenges while protecting MSWD interests.
W O R K Q U A L I T Y A N D C O S T C O N T R O L S TKE takes pride in its reputation for thoroughness, rapid turnaround, cost efficiency and overall quality of work, and believes that a high level of quality is needed on all services provided by TKE. Key components of TKE’s construction
program include check lists, templates, trained and
experienced staff and communication with District staff and contractor. High quality services yield ease of project oversight, smoother processing, minimal delays in construction,
minimized construction support cost, absence of change
orders, and reduced claims and dispute resolution costs.
TKE believes that the most successful quality assurance program is one that is applied inherently throughout the entire process. This program requires not only formal procedures for checking, but encourages the conscientious effort of
experienced people to always “think quality” in every task performed throughout the construction process. This program has become a natural element in all aspects of TKE’s
construction management and inspection activities, and will guide all services provided by TKE.
Effective QA/QC includes assignment of experienced staff, continuity of staffing, schedule review and compliance, comprehensive field review and compilation of site data, review by constructability expert, established inspection procedures, understanding standards, plans and details, and effective communication. The Quality Assurance / Quality Control program is in place to ensure that services provided by TKE continues to exceed the standards of our clients and that we will deliver the construction projects on schedule and within budget.
Regarding cost controls, TKE’s client manager will provide monthly progress reports documenting project progress for all projects assigned to TKE using a comprehensive project
management summary. The summary includes project name
and related number, description of progress, budget status, schedule compliance, change order summary, unresolved
issues, and anticipated upcoming accomplishments.
C O N F L I C T R E S O L U T I O N
One of TKE’s greatest strengths is conflict resolution. Through our history, not one of TKE’s projects has resulted in litigation.
We use a proactive approach to conflict resolution that includes continuous communications, development of alternative
proposals and reason. Our not-confronting project and
construction managers and approach has continued proven success.
3. P R O J E C T
M A N A G E M E N T
A P P R O A C H
TKE’s management approach for the typical projected scope of services is presented in the following paragraphs:
P a g e | 27
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION H | ADDITIONAL INFORMATION
TKE routinely assists cities with construction management and inspection of their capital improvement and development services programs. CIP projects TKE has completed for various cities have included: street rehabilitation program for arterial highways, collectors, and residential streets; intersection and traffic signal improvements; miscellaneous sidewalk and concrete replacements for Americans with Disabilities Act (ADA) improvements; installation of traffic signals; construction of park improvements; bridge maintenance and repairs, water, recycled water and waste water facilities, systems, and rehabilitation of City-owned facilities. TKE will be in constant communication with City staff during the projects entirety to ensure that the project is running smoothly and in accordance with the City’s expectations. TKE will hold regular meetings with City staff, Contractor and Inspector, meetings with utilities/agencies, and affected agencies. Each is discussed below:
Monthly Progress Reports – TKE documents project progress for all project’s assigned to TKE by a comprehensive project management summary. The summary includes project name
and related number, description of progress, budget status, schedule compliance, and anticipated upcoming
accomplishments.
Record Keeping – TKE keeps records in an organized filing system both in hard copy and electronic forms. This organized filing system allows TKE to access records immediately should they be needed.
City Meetings – TKE will meet with City staff as required to keep staff fully apprised as to construction progress and potential project issues. We will prepare agendas and minutes for each meeting.
Biweekly Contractor Meeting – our Construction Manager will meet with the project contractor biweekly. We will prepare agendas and minutes for each meeting. Meeting agenda will typically include background, old business, new business, scope, objectives, traffic control, construction phasing, project schedule, potential issues discussion, payment quantities discussion, and any safety deficiencies observed.
Utilities/Agency Meetings – as mentioned above, TKE will invite utilities and agencies to the preconstruction conference.
During that meeting, all potential project impacts will be discussed with each. During construction, should issues develop needing further discussions with utilities/agencies, TKE will meet with each and develop remediation strategies. Again, all meetings will be documented with minutes.
4. S O F T W A R E
A V A I L A B I L I T Y
The TKE’s staff is familiar with various project management software that we utilize for monitoring budget and schedule as well as other project factors, including Virtual Project Manager, Microsoft Project, Primavera, Microsoft Word, Microsoft Excel, AutoCAD, and BlueBeam. Our key personnel also has
experience using SmartSheets, VPM, Procore, VPO, Zoom,
Trakit, Microsoft Teams, Base Camp, SharePoint, and other project software needed to successfully implement projects.
P a g e | 28
Request for Qualifications No. 24-02 | On-Call Public Works Construction Management, Inspection, and Materials Testing
City of Downey
SECTION H | ADDITIONAL INFORMATION
SECTION H | ADDITIONAL INFORMATION
Δ As previously discussed, TKE Engineering Inc. (TKE) encourages the City to verify with our qualifications with our references and verify TKE’s ability to provide efficient and effective services on schedule and within budget.
Δ TKE is extremely active in the engineering community. Key members of TKE’s staff have been serving volunteer roles on the American Society of Civil Engineers San Bernardino and Riverside Counties and Los Angeles Section Boards, American Council of Engineering Companies Inland Empire Board, American Public Works Association Inland Empire Board and are members of the American Water Works Association and Society of American Military Engineers.
Δ TKE Engineering has no conflict of interest in connection with providing the services.
Δ TKE’s project team is committed to providing services as presented herein. In addition, TKE maintains state of the art engineering resources that ensure complete compatibility with our client’s resources including computer software compatibility, filing protocol, communications protocol, and survey data.
Δ TKE will respond to the City’s needs as they arise. The City will be an important client since, as a small firm, all of our clients are given the utmost attention. TKE commitment will ensure that all of the City’s needs are met. We strongly encourage the City to verify our performance history with our references. Because of TKE proactive management approach, TKE rarely experiences ‘crisis’ project delivery needs. When requested by our clients, TKE adds resources, commits extended work hours, develops an efficient implementation plan and other efforts as needed.
City of Downey
Proposal
FY 2024-2027 On-Call Public Works
Construction Management, Inspection, &
Materials Testing
March 15, 2024
Attachment F
March 15, 2024
City of Downey
Department of Public Works
Attn: Matthew Baumgardner, PE
Director of Public Works/City Engineer
11111 Brookshire Avenue
Downey, CA 90241-7016
Subject: Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
The City of Downey is seeking qualified firms to provide Public Works Construction Management, Inspection and Materials Testing Services on an as-needed or on-call basis. Willdan Engineering (Willdan) has the resources, staff, and experience to meet the City’s needs. Willdan has assembled a team who are committed to providing top-quality services to the City of Downey. We believe that we are highly qualified to undertake this assignment because of strong project management, experienced team, and our working knowledge of public agency policies and procedures. As a municipal consulting firm, we are aware of the City’s needs and desires in undertaking a contract of this type. Willdan’s personnel are experienced in working as an integral part of agency staff and, therefore, are familiar with county standards, guidelines, and procedures. This knowledge and experience will allow Willdan to be most responsive to your needs and requirements. As a multidisciplinary firm, we have a full complement of resources to provide thorough and accurate project management and construction engineering services. Our firm’s strengths include the following:
Highly skilled Contract Manager. Mr. Michael Bustos, ENV SP is a licensed civil engineer in our Ventura office who offers over 23 years of construction management and public works experience.
Mr. Bustos currently serves as Deputy Director of Willdan’s Construction Management and Inspection group and has served as Project Manager for numerous On-Call Construction Management and Inspection projects with municipalities throughout California. Staffing Resources. Our in-house staffing resource bench of licensed and technical experts consists of specialists in construction management and inspection, public outreach, labor compliance, geotechnical engineering and materials testing/inspection, design, planning, building and safety, city and county engineering for all types of public works projects including pavement rehabilitation, street improvements, water resources, wastewater, highways and roadways, drainage and flood control, traffic signals, tenant improvements, parks, electrical and fiber optic improvements. The breadth and diversity of the firm’s expertise means our construction engineering experts can draw upon the considerable experience of the firm – maximizing efficiency, productivity, and quality in meeting project schedules and budgets.
Willdan is excited for the opportunity at a successful partnership with the City of Downey. We welcome the opportunity to meet with the City to further discuss our qualifications and experience and to demonstrate how we can best assist the City with upcoming and future needs.
Respectfully submitted,
WILLDAN ENGINEERING
Vanessa Muñoz, PE, TE
President and Director of Engineering
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
1 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Table of Contents
Table of Contents ...............................................................................................................................1 Executive Summary ............................................................................................................................2 Firm Overview ...................................................................................................................................3 Key Personnel and Subconsultants .....................................................................................................4 Resumes .................................................................................................................................................... 6 Relevant Projects and References ..................................................................................................... 16 References ............................................................................................................................................... 19 Project Management ....................................................................................................................... 20 Project Approach ..................................................................................................................................... 20 Fee Schedule .................................................................................................................................... 25
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
2 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Executive Summary
Over the past 25 years, Willdan has provided the City of Downey with outstanding service in the areas of planning staff augmentation, environmental civil and traffic design, grant writing, engineering design services, and geotechnical services. Our team is fully committed to successful completion of all task orders assigned/awarded under this contract.
Throughout our 60-year history, Willdan has served as a full-service, multidisciplinary firm specializing in municipal engineering and planning services along with a full complement of support disciplines necessary for a sustainable project. Today, Willdan operates out of 51 offices located throughout the United States and over 1,500 employees.
Willdan shall provide services based out of our Industry office, located at 13191 Crossroads Parkway North, Suite 405, Industry, CA 91746. Willdan also holds 3 other offices in the greater Los Angeles/Orange County area. Their addresses are provided below. Willdan Anaheim, 2401 E Katella Ave Suite 300, Anaheim, CA 92806 Willdan Ventura, 374 Poli St Suite 101, Ventura, CA 93001 Willdan San Bernardino, 650 E Hospitality Ln Suite 400, San Bernardino, CA 92408 Willdan has selected Mr. Michael Bustos, ENV SP as Project Manager for this contract. Mr. Bustos may be reached at [email protected] or phone (805) 279-6870. Mike will be supported by Christopher Baca, RCI, who will serve as Deputy Project Manager. He may be reached at [email protected] or phone (310) 502-6335.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
3 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Firm Overview
Willdan Engineering (Willdan), a California corporation since May 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to nationwide clientele through three subsidiary firms – Willdan Engineering, Willdan Energy Solutions, and Willdan Financial Services – that offer a portfolio of diversified strengths. Willdan infuses a corporate culture of Customer-First throughout our entire staffing resources and all services provided to our clients. Looking out for our clients’ best interests is at the forefront of everything we do.
Our services and in-house support disciplines encompass urban and regional planning; traffic, civil, structural, geotechnical, right-of-way, city, and special district engineering; program/construction management and inspection; plan, study, and report review; building safety; drainage and flood control; mapping; and other complementary services such as GIS, utility coordination and relocation, and landscape architecture. With this depth of experience, expertise, knowledge, and resources, Willdan offers comprehensive solutions that are timely, cost effective, and tailored to meet the needs of individual communities. Our understanding of public agency challenges and needs is what makes Willdan unique.
Financial Strength
Willdan maintains a strong balance sheet with the financial and staffing resources to perform and complete all contractual obligations. We have continued to grow to better serve our clients by offering a continuously expanding range of municipal services. Willdan operates out of 51 offices located throughout the United States and over 1,500 employees.
Financial information, including information on revenue, earnings, and cash flow, are issued quarterly, and can be found at www.willdan.com . There are no pending conditions such as bankruptcy, pending litigation, planned office closure, impending merger, etc., that would impede Willdan’s ability to complete the City’s contract.
Corporate Mission and Philosophy
From Day 1, Willdan has maintained a business strategy focused on providing services to only public agencies. Today, 98 percent of our business is with public agencies. This strategy prevents potential conflicts of interest with private enterprises conducting business with our public agency clients or within their jurisdiction. Unique to Willdan is our understanding of public agency needs and issues. Willdan’s professionals often serve to extend our clients’ staff in the capacity of city and traffic engineers, planning directors, building officials, and other public agency positions. Additionally, many provide the added value of having served in public agency management positions prior to joining Willdan.
To meet and, on many occasions, exceed the expectations of our clients, Willdan fosters and instills a corporate culture of Customer-First among our staff and in our day-to-day work environment. Looking out for the County’s best interests is at the forefront of everything we do. Our customer-focused philosophy is particularly evident when dealing with complex situations and difficult challenges that are hard to resolve.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
4 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Key Personnel and Subconsultants
Willdan offers the City of Downey a highly qualified team of professionals with the technical qualifications and diverse capabilities necessary to undertake construction management and inspection services for the City. References and Staff information have been included. Willdan understands that key personnel assigned on projects shall not be reassigned without prior written approval from the City.
Team / Title / Experience / Role Credentials
Mr. Michael Bustos, PE, ENV SP Deputy
Director of Construction Management and
Inspection
23 Years’ Experience
Project Role: Project Manager
BS, Civil Engineering, California Polytechnic State University, San Luis Obispo
Caltrans Resident Engineer Academy
Civil Engineer, California No. 73173
Envision Sustainability Professional, Institute for Sustainable Infrastructure No. 2696
Mr. Chris Baca, RCI
Director of Construction Management and
Inspection
40 Years’ Experience
Project Role: Deputy Project Manager
BS, Public Administration, California State University, Fullerton Public Works Inspection, California State University, Los Angeles Extension
California, Division IV, Public Works, RCI No. 4161
California, Division I, Engineering, RCI No. 5161
Caltrans Resident Engineer Academy
Mr. Roy Shaver, PE
Construction Manager
40 Years’ Experience
Project Role: Lead Construction Manager
Civil Engineer, California No. 44587
PMP from PMI (2005 to 2020), PMI Subject Matter Expert for Risk Management
OSHA 40 hour and Confined Space
ICBO Reinforced Concrete
Asphalt Concrete Inspection and Testing certifications offered by Caltrans
Nuclear Density Gauge Certified
Phase I Environmental Site Assessor (State of California) Post-Disaster Building Assessor (CalOES)
Mr. Saul Martinez
Construction Manager
25 Years’ Experience
Project Role: Construction Manager
Engineer-in-Training, CA No. 112670
Qualified SWPPP Practitioner (QSP)
Certified Erosion, Sediment, & Stormwater Inspector (CESSWI) Nuclear Density Gauge certified
Caltrans Resident Engineer Academy
Mr. Heleo Espinoza
Construction Inspector
37 Years’ Experience
Project Role: Construction Inspector
Citrus College, Mount San Antonio College, and Rancho Santiago College
JPIA Training Courses
AWWA Training Courses
City of Santa Fe Springs Supervisor Training Courses
State Certified in Water Treatment
State Certified in Water Distribution
Mr. Oscar Blanco
Construction Inspector
37 Years’ Experience
Project Role: Construction Inspector
Advanced Contractor & Inspector Training Center, Inc, Anaheim, California
Business Management & Finance, Mount San Antonio College ICC Reinforced Concrete Special Inspector
ACI Tech 1, No. 00057576
ICC Soils, No. 9190015
Caltrans CT 105, 125 AGG, 201, 202, 205, 216, 231, 375
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
5 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Mr. Mario Cisneros
Assistant Construction Manager
8 Years’ Experience
Project Role: Office Engineer
BS, Civil Engineering, California State University, Northridge Caltrans Resident Engineer Academy
Traffic Control for Safer Work Zones Certification
Ms. Jane Freij
Labor Compliance Manager
30 Years’ Experience
Project Role: Labor Compliance Manager
BA, Linguistics, University of Kansas
Attorney Assistant Training Program, Litigation/ Corporations, University of California, Los Angeles
Ms. Lani Alfonso, PE
Principal Project Manager
20 Years’ Experience
Project Role: Grant Funding
Administrator
BS, Civil Engineering
Civil Engineer, California, No. 56397
Dr. Chien-Chang Chen, PhD, PE, GE
Supervising Engineer
24 Years’ Experience
Project Role: Materials Testing
PhD, Geotechnical Engineering, Georgia Institute of Technology MS, Geotechnical Engineering, Georgia Institute of Technology BS, Civil Engineering, National Chiao Tung University, Taiwan Geotechnical Engineer, California No. 3183
Civil Engineer, California No. C63238
The organization chart below identifies the project roles for our team and illustrates the communication and reporting relationships among the team. Any changes in identified key personnel after the award of the agreement will be approved by the City in writing before the change is made. Willdan’s proposed team is available to begin work as soon as possible after the selected firm receives the notice to proceed.
Proposed Key Staff Resumes
Resumes for our proposed key staff are located in the following pages. Due to page limit constraints, resumes have been limited to one page. Willdan is pleased to provide full resumes at the request of the City.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
6 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Resumes
Michael D. Bustos, PE, ENV SP
Deputy Director of Construction Management and Inspection Project Role: Project Manager
Profile Summary
Education: BS, Civil Engineering (Magna Cum Laude), California Polytechnic State University, San Luis Obispo
Caltrans Resident Engineer Academy
Registration: Civil Engineer, California No. 73173
Envision Sustainability Professional, Institute for Sustainable Infrastructure Experience: 23 Years
Mr. Michael Bustos is responsible for project and construction management of drainage, pipeline, pavement rehabilitation, street improvement, traffic signal, landscaping and irrigation, and grading projects. He has served as construction manager or resident engineer for over 100 public works projects, including over 20 federally funded projects. He serves as project manager for Willdan’s on-call construction management and inspection services provided to the cities of Downey, Ridgecrest, Inglewood, Westlake Village, Santa Monica, and Fillmore. He has gained valuable experience in on-site construction management, off-site construction administration, design, and plan checking.
Relevant Project Experience
Old River School Road Pavement Rehabilitation Project, City of Downey, CA. Construction Manager.
Willdan provided construction management, inspection, material testing, and labor compliance services for the CIP Pavement Rehabilitation Project between Imperial Highway and Arnett Street. The work generally consisted of the installation of traffic signal communications conduit and 32,000 LF of fiber-optic cables, pull boxes and termination panels; rehabilitation of existing pavement, cold milling, placement of asphalt concrete leveling course and rubberized asphalt concrete overlay; replacement of non-standard curb ramps and uplifted or damaged curb and gutter and sidewalk in compliance with ADA requirements; implementation of Class II and Class III bike facilities; and replacement of incidental striping and signage.
Lakewood Boulevard Improvements Phase 3C, City of Downey, CA. Construction Manager. Willdan provided construction management and material testing services. The project consisted of street widening and improvements along Lakewood Boulevard (from Gallatin Road to 450 feet south of Telegraph Road) and Lindell Avenue (from I-5 NB Off Ramp to Telegraph Road). The work included unclassified excavation, grading and compacting of aggregate base, cold milling, construction of conventional and rubberized hot mix asphalt, construction of curbs, gutters, sidewalks, curb ramps, driveways, cross gutters and bollards, utility adjustments, installation of traffic signage, striping and pavement markings, drainage improvements, water quality improvements (bioswale and underground infiltration basin), potable and recycled water improvements, traffic signal and street lighting improvements, landscaping and irrigation improvements, new bus shelters, and newsstand relocations.
Various Water System Improvements Projects, City of Downey, CA. Project Manager/Construction Manager. Willdan has provided construction management, inspection, and materials testing on a number of water system infrastructure projects for the City of Downey over the last five years, including Lakewood Blvd at Firestone Blvd, Third Street, Fourth Street, Fifth Street, Sixth Street, Stamps Road, Woodruff Ave, Samoline Avenue and Melva Street, and Paramount Blvd.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
7 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Christopher Baca, RCI
Director of Construction Management and Inspection
Project Role: Deputy Project Manager
Profile Summary
Education: BS, Public Administration, California State University, Fullerton Public Works Inspection, California State University, Los Angeles Extension Asphalt Paving, Contract Administration and Change Orders for Federally Funded Projects Seminars
Inspection Principles, Public Contact, Slurry Seal, and Traffic Signal Inspection and Design Seminars
Caltrans Resident Engineer Academy
Registration: Registered Construction Inspector, Division IV, Public Works, California No. 4161 Registered Construction Inspector, Division I, Engineering, California No. 5161 Experience: 40 Years
Mr. Christopher Baca is responsible for directing and monitoring public works inspection services and overseeing construction inspection personnel. His experience includes construction management of capital improvement projects in areas of water systems, street improvements, park improvements, storm drains, sanitary sewers, asphalt resurfacing (including asphalt-rubber products), concrete paving, landscaped medians, and traffic signals. Mr. Baca is familiar with the inspection and contract administration of other federally funded projects in accordance with Caltrans Local Assistance Procedures Manual. Prior to joining Willdan, Mr. Baca worked for a soils engineering firm conducting field inspections and performing laboratory testing.
Relevant Project Experience
On-Call Construction Management and Inspection Services, City of Downey, CA. Deputy Project Manager.
Willdan has provided on call construction management and inspection services to the City of Downey since 2018.
On-Call Construction Management Services, City of Norco, CA. Project Manager. Willdan provides on-call public works inspection for various projects throughout the City of Norco.
On-Call Public Works and Construction Management Services, City of Redlands, CA. Project Manager.
Willdan provides public works inspection and construction management services for various projects located throughout the City.
On-Call Construction Management and Inspection Services, City of Rancho Cucamonga, CA. Project Manager. Willdan is providing construction management and inspection services for the City of Rancho Cucamonga. A few of the projects are Crest Road at Whitley, Robert Ryan Park Construction, Arterial Street Resurfacing, and Hawthorne Boulevard at PVDW Landscape On-Call Construction Management and Inspection Services, City of Newport Beach, CA. Project Manager.
Willdan provides construction management and inspection on various permitted and capital improvement projects throughout the City.
On-Call Construction Management Services, City of Brea, CA. Project Manager. Willdan provides on-call construction management and public works inspection for various projects throughout the City of Brea.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
8 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Roy Shaver, PE
Construction Manager
Project Role: Lead Construction Manager
Profile Summary
Education: BS, Civil Engineering, California State University, Chico Registration: Civil Engineer, California No. 44587
PMP from PMI (2005 to 2020), PMI Subject Matter Expert for Risk Management OSHA 40 Hour and Confined Space
ICBO Reinforced Concrete
Asphalt Concrete Inspection and Testing certifications offered by Caltrans Nuclear Density Gauge Certified
Phase I Environmental Site Assessor (State of California) Post-Disaster Building Assessor (CalOES)
Experience: 40 Years
Roy Shaver, PE, has 40 years of experience – 20 of those as a Caltrans employee in the Construction, Geotechnical, and Environmental Divisions. As a Central Region Project Manager, he managed up to 15 transportation projects simultaneously across 11 California counties, with a total worth of up to $250M.
His expertise in construction management and field inspection allowed him to provide technical reviews and guidance, ensuring that all projects were delivered on schedule, within budget, and to the highest quality standards.
Relevant Project Experience
Euclid Water Improvements, City of La Habra, California. Construction Manager. Willdan is currently providing construction management and inspection services for the Euclid Street Water Main Replacement Project between Hidden Lane and Whittier Blvd. The general items of work to be performed for the subject project consist of construction of 12” C900 PVC water pipelines, water tie-ins, valves, fittings; hydrants and water services; removing conflicting water pipes, valves, and fittings necessary for construction of new water facilities; abandoning existing water lines and water line services; and pavement trenching and repair.
PFAs Treatment System Project No. 50042, City of Pico Rivera, California. Construction Manager.
Willdan provided constructability review, construction management, utility coordination, public works inspection, labor compliance, and close-out services for this project, which consisted of construction of equipment pads and installation of water treatment process equipment, including process valves, fittings, instrumentation, grading and paving, and accessories and appurtenances, construction of storm drain system with tie in into County storm sewer, demolition of building at Plant #3 and wing wall of building at Well #5 site, removal of trees, electrical system and control system.
Construction Engineering Services for the Emergency Bridge Repair Project, County Road 306 at Salt Creek – Federal Project Number 15J7(002), County of Glenn, California. Resident Engineer/ Construction Manager. Willdan provided professional construction engineering services for the management and inspection of a project for the emergency repair of damage to County Road 306 at Salt Creek. The goal of the project was to fix an emergent structural deficiency at both bridge approaches caused by scour and erosion; and restore the bridge and County Road 306 to pre-existing conditions.
The construction work was completed under force account due to the emergency nature of the contract. This project replaced the fill behind both bridge abutments, replaced the sacked concrete with rock slope protection (RSP), restored the roadway with new compacted aggregate base and hot mix asphalt (HMA), and constructed non-erosive drainage outlets to the creek.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
9 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Saul Martinez
Construction Manager
Project Role: Construction Manager
Profile Summary
Education: BS, Civil Engineering, California State Polytechnic University, Pomona AA, Mount San Antonio College, Walnut, California
Drafting Certificate, Santa Ana College, Santa Ana, California Registration: Certification as a Qualified SWPPP Practitioner (QSP) Certified Erosion Sediment and Storm Water Inspector
Engineer-In-Training (E.I.T.)
Experience: 22 Years
Mr. Saul Martinez possesses over 22 years of public works inspection and construction management experience. Mr. Martinez has experience working as a Project Management, Plan Review, and a Project Engineer. He has experience working on projects such as street rehabilitation, street improvements, irrigation system, street lighting, water reservoir, water improvement, storm drain, and sewer improvements.
Relevant Project Experience
Country Hills Subdivision Water and Street Improvements, City of Brea, California. Project Manager.
Construction Manager. The project consisted of rehabilitating the asphalt pavement, concrete pavement, curb, curb and gutter, and replacing approximately 12,593 linear feet of existing water main, 649 1-inch service lateral connections, 54 fire hydrant service lateral connections and installing new water meters in the residential streets within the Country Hills Subdivision. The project also included the removal and replacement of existing damaged curb ramps, longitudinal gutters, cross gutters and the adjustment of existing utilities to grade, traffic striping, traffic control, and other associated improvements.
On-Call Construction Management and Inspection, City of Rolling Hills Estates, California. Construction Manager and Public Works Inspector responsible for public works and permit inspections, managing biddability and constructability of CIP projects with emphasis on claim avoidance, checking contract documents to ensure compliance with State and Caltrans funding requirements.
Butterfly Garden Park, City of Bellflower, California. Construction Manager. Willdan provided construction management, construction inspection, materials testing, and labor compliance services for this project, which is funded by Proposition 84 Urban Greening Grant Program. The goal of the project is to develop a sustainable green space with permeable surfaces, bioswale, walking path, benches, native plant vegetation that attracts butterflies, interpretive signage, and complimentary butterfly-shaped paving. The improvements include removals, driveway approaches, new asphalt pavement, curbs and gutters, sidewalks, permeable AC, DG walkways, colored PCC pavement, ornamental steel fencing, vehicular swing gates and rolling gates, monument signage, drinking fountains and bottle filling stations, park benches, bike racks, shade structures, pedestrian bridges, irrigation, and landscaping. Mr. Martinez is responsible for construction management duties and overseeing Willdan’s inspection and testing staff.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
10 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Heleo Espinoza
Construction Inspector
Project Role: Construction Inspector
Profile Summary
Education: Citrus College, Mount San Antonio College, and Rancho Santiago College JPIA Training Courses
AWWA Training Courses
City of Santa Fe Springs Supervisor Training Courses
Registration: State Certified in Water Treatment (1)
State Certified in Water Distribution (2)
Experience: 37 Years
Heleo Espinoza has 37 years of experience in Public Works, with strong leadership qualities and the ability to manage projects successfully. He possesses exceptional decision-making capabilities and is meticulous in ensuring project specifications are compliant with contracts and requirements. He has outstanding customer service skills dealing with clients and contractors and is well organized, with excellent time management abilities, to complete projects on time and within budget.
Relevant Project Experience
Firestone at Lakewood Boulevard Water, Downey, California. Public Works Observer. Willdan provided Public Works Inspection and Materials Testing Services for this project which consisted of jack and boring under the railroad track, installing new services and hydrants along Firestone Blvd, and installing new pipeline on Lakewood Blvd.
3rd Street Water Main Project Water System Improvements Project, City of Downey, California. Public Works Inspector. Mr. Espinoza performed public works inspection of the 3rd Street Water System Improvements project, which consisted of installation of new water mains, valves, fittings, and appurtenances, abandoning of old undersized water main, replacement of existing fire hydrants, installation of new fire hydrants, installation of new copper water service lines, replacement of old water meters with remote-read water meters on 3rd Street from Paramount Blvd to Civic Center Drive.
CIP 23-20 4th Street Water, Downey, California. Public Works Observer. Willdan provided Public Works Inspection and Materials Testing Services for the 4th Street Water System Improvements Project which consisted of installation of new water mains, valves, fittings, and appurtenances, abandoning of old undersized water main, replacement of existing fire hydrants, installation of new fire hydrants, installation of new copper water service lines, replacement of old water meters with remote-read water meters, and completion of associated asphalt and concrete work on 4th Street from Paramount Blvd to La Reina Avenue. 5th Street Water Improvements, City of Downey, CIP 21-15, California. Public Works Inspector. Willdan provided construction inspection and materials testing to the City’s 5th Street Water Improvements project. The project includes repairs to various portions of the water line on 5th Street.
PFAs Treatment System Project, City of Pico Rivera, California. Lead Public Works Inspector. Willdan is providing construction management, utility coordination, inspection, and labor compliance for this project that consists of construction of equipment pads and installation of water treatment process equipment, with yard piping, valves, fittings, instrumentation, appurtenances and accessories, as well as grading and paving. Construction includes a storm drain system with tie into County storm sewer (Plant 1), demolition of building at Plant 3 and of wing wall of building at Well 5, removal of tree at Plant 2, and electrical systems and control systems.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
11 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Oscar Blanco
Construction Inspector
Project Role: Construction Inspector
Profile Summary
Education: Advanced Contractor & Inspector Training Center, Inc., Anaheim, CA Business Management and Finance, Mount San Antonio College, Walnut, CA Registration: ICC Reinforced Concrete Special Inspector ACI Tech 1, No. 00057576
ICC Soils, No. 9190015
Pile Driving & Grading, Active Deputy Inspector, No. BDEP210413 Caltrans CT 105,125 AGG, 201, 202, 205, 216, 226, 231, 375 Experience: 40 Years
Mr. Oscar Blanco has over 40 years of experience in public works construction, inspection, and soils testing. He is a certified State of California Construction Inspector and has extensive knowledge of the American Standard Testing Method (ASTM) codes, as well as of building code. He has worked with many different government agencies and possesses excellent communication and public relation skills. He is knowledgeable in soils and with sampling from drill rigs, concrete coring, and with running lab tests. He is experienced in management and coordination of construction projects, specializing in quality inspections on public works projects. Mr. Blanco is bilingual in English and Spanish.
Relevant Project Experience
3rd Street Water Main Project Water System Improvements Project, City of Downey, California. Public Works Inspector. Mr. Blanco assisted with public works inspection of the 3rd Street Water System Improvements project, which consisted of installation of new water mains, valves, fittings, and appurtenances, abandoning of old undersized water main, replacement of existing fire hydrants, installation of new fire hydrants, installation of new copper water service lines, replacement of old water meters with remote-read water meters, and completion of associated asphalt and concrete work on 3rd Street from Paramount Blvd to Civic Center Drive.
PFAs Treatment System Project No. 50042, City of Pico Rivera, California. Public Works Inspector.
Willdan is providing construction management, utility coordination, inspection, and labor compliance for this project that consists of construction of equipment pads and installation of water treatment process equipment, with yard piping, valves, fittings, instrumentation, appurtenances and accessories, as well as grading and paving. Construction includes a storm drain system with tie into County storm sewer (Plant 1), demolition of building at Plant 3 and of wing wall of building at Well 5, removal of tree at Plant 2, and electrical systems and control systems.
FY 22-23 Measure V Pavement Rehabilitation and Chip Seal, City of Ridgecrest, California. Public Works Observer. Willdan provided civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, and labor compliance services for two construction projects funded by the City’s local gas tax. The $6 million pavement rehabilitation project included PCC Improvements, widenings, and overlay of 19 street segments throughout the city and the $700,000 chip seal project included chip seal and striping of 17 street segments throughout the city.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
12 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Mario Cisneros
Assistant Construction Manager
Project Role: Office Engineer
Profile Summary
Education: BS, Civil Engineering, California State University, Northridge Registration: Caltrans Resident Engineer Academy, Traffic Control for Safer Work Zones Certification Experience: 8 Years
Mr. Mario Cisneros serves as Office Engineer and Construction Manager on public works capital improvements projects. His experience includes management of pavement rehabilitation, street improvements utility installations, traffic signal improvements, fiber optics, water wells, and building renovation projects. Mr. Cisneros uses his knowledge and skills in reviewing and implementing projects and plans, using cost-effective tools and techniques, dealing with contractors, staff, and efficiency to solve complex problems in order to bring maximum efficiency to the projects he’s involved on. He has the ability in working closely with team members, effectively accomplishing assigned responsibilities.
Relevant Project Experience
Old River School Road Pavement Rehabilitation Project, City of Downey, CA. Office Engineer. Willdan provided construction management, inspection, material testing, and labor compliance services for the CIP Pavement Rehabilitation Project. Between Imperial Highway and Arnett Street, generally consists of the installation of traffic signal communications conduit and 32,000 LF of fiber-optic cables, pull boxes and termination panels; rehabilitation of existing pavement, including removal and reconstruction of asphalt concrete base course, cold milling existing asphalt pavement, placement of asphalt concrete leveling course and rubberized asphalt concrete overlay; replacement of non-standard curb ramps and uplifted or damaged curb and gutter and sidewalk in compliance with the Americans with Disabilities Act (ADA) requirements; implementation of Class II and Class III bike facilities; and replacement of incidental striping and signage.
Emergency Sewer Repair Project on “C” Street, City of Fillmore, California. Office Engineer. Willdan provided construction management, construction inspection, labor compliance, and material testing services for the emergency sewer repair project being constructed as a result of a manhole collapse in State right of way near “C” Street and Highway 126 rendering a downstream sewer line unusable. The Project involved sewer bypass system, dewatering system, manhole reconstructions, and epoxy coatings, open cut trench sewer replacement within City right of way on C St, bore/jack across State right of way on Highway 126, reconnection of sewer lateral service connections, and 2” ARHM overlay of C St.
FY 22-23 Measure V Pavement Rehabilitation and Chip Seal, City of Ridgecrest, California. Construction Manager. Willdan provided civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, and labor compliance services for two construction projects funded by the City’s local gas tax. The $6 million pavement rehabilitation project included PCC Improvements, widenings, and overlay of 19 street segments throughout the city and the $700,000 chip seal project included chip seal and striping of 17 street segments throughout the city.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
13 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Jane Freij
Labor Compliance Manager
Project Role: Labor Compliance Manager
Profile Summary
Education: BA, Linguistics, University of Kansas
Attorney Assistant Training Program, Litigation/Corporations, University of California, Los Angeles
Experience: 30 Years
Ms. Jane E. Freij is an experienced Administrative/Project Manager with a proven record of comprehensive and effective management of time and budget. Key areas of expertise include project needs analyses, scheduling and budgeting, contract administration/negotiation, legal documentation, policy and procedure development, and writing and editing. Asa Supervising Labor Compliance Manager, Ms. Freij provides oversight of labor compliance monitoring services for various federally-funded projects under FHWA, FTA, HUD, and EPA. She is familiar with the FHWA federal funding administration process from field review and request for authorization to final invoicing and has specialized training in the reporting requirements and fraud detection and prevention procedures for projects funded by the American Recovery and Reinvestment Act of 2009 (ARRA). Experience prior to joining Willdan includes 4 years with Edison Enterprises, where Ms. Freij served as Contract Administrator and Senior Contract Administrator. In these positions, she developed and negotiated contracts for products and services, monitored and enforced contractual compliance, constructed contractual terms and conditions, served as risk management liaison, and managed a multi-state licensing project for an energy services subsidiary.
Ms. Freij has a strong legal background, having served as a paralegal and senior paralegal for litigation attorneys in the areas of real estate, land development, and contract law.
Relevant Project Experience
Measure K-14 Street Repair and Rehabilitation Program, Project CIP 2295-15, City of Grover Beach, California. Labor Compliance Manager. Willdan provided construction management, inspection, material testing, and labor compliance services for cape seal on portions of N. 6th, Charles, Manhattan, Seabright, S. 7th and S. 10th Street. The project included sidewalk construction, driveway reconstructions, ADA compliant curb ramps, curb and gutter and AC dike installations, wall modifications, chip seal, microsurfacing, signage, and striping.
Emergency Sewer Repair Project on “C” Street, City of Fillmore, California. Labor Compliance Manager.
Willdan provided construction management, construction inspection, labor compliance, and material testing services for the emergency sewer repair project being constructed as a result of a manhole collapse in State right of way near “C” Street and Highway 126 rendering a downstream sewer line unusable. The Project involved sewer bypass system, dewatering system, manhole reconstructions, and epoxy coatings, open cut trench sewer replacement within City right of way on C St, bore/jack across State right of way on Highway 126, reconnection of sewer lateral service connections, and 2” ARHM overlay of C St. Total construction cost was approximately $4 million.
FY 22-23 Measure V Pavement Rehabilitation and Chip Seal, City of Ridgecrest, California. Labor Compliance Manager. Willdan’s provided civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, and labor compliance services for two construction projects funded by the City’s local gas tax. The $6 million pavement rehabilitation project included PCC Improvements, widenings, and overlay of 19 street segments throughout the city and the $700,000 chip seal project included chip seal and striping of 17 street segments throughout the city.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
14 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Lani Alfonso
Principal Project Manager
Project Role: Grant Funding Administrator
Profile Summary
Education: BS, Civil Engineering, University of Southern California, Los Angeles, California Certifications: Civil Engineer, California No. 56397
Experience: 30 Years
Ms. Lani Alfonso is a Willdan Engineering City Engineer with 30 years of experience in public works engineering and project management who combines excellent communication and management skills with analytical and technical qualifications.
Relevant Project Experience
Old River School Road Rehabilitation, STPL-5334(059), City of Downey, California. Grant Funding Administrator. Willdan providing construction management, inspection, materials testing, and labor compliance for the federally funded Old River School Road Pavement Rehabilitation Project. This project generally consisted of the installation of 32,000 LF of fiber-optic traffic signal communications conduit, pull boxes and termination panels; cold milling existing asphalt pavement, placement of asphalt concrete leveling course and rubberized asphalt concrete overlay; replacement of curb ramps and uplifted or damaged curb and gutter and sidewalk in compliance with the ADA requirements; implementation of Class II and Class III bike facilities; and striping and signage. These services were provided under Willdan’s on-call construction management and inspection contract. Ms. Alfonso was responsible for HSIP funding administration, including preparation and submission of Requests for Authorization, Award Package, progress invoices, and Final Report of Expenditures to Caltrans.
West Ward Avenue Rehabilitation Phase 2, STPL-5385(075), City of Ridgecrest, California. Grant Funding Administrator. Willdan provided construction management, inspection, labor compliance, and grant administration services and Union Materials Testing is providing materials testing as a subconsultant to Willdan for this federally funded pavement rehabilitation project on Ward Avenue.
Ward Ave Street Rehabilitation and Sewer Rehabilitation, STPL-5385(067). Grant Funding Administrator.
Willdan provided design, bidding assistance, construction management, labor compliance, materials testing, and federal funding administration for this federally funded roadway project on Ward Ave between China Lake Blvd and Norma St. The Project also included non-participating costs for rehabilitation of the City’s existing sewer system on Ward Ave between China Lake Blvd and Downs St.
Ms. Alfonso was responsible for STPL funding administration, including preparation and submission of Requests for Authorization, Award Package, progress invoices, and Final Report of Expenditures to Caltrans.
Fair Oaks Traffic Signal Improvements, HSIPL-5071(020), City of South Pasadena, California. Grant Funding Administrator. This federally funded project included the installation of various traffic signal system items, including new emergency vehicle preemption (EVP) systems, ethernet switches, fiber hub switches, ethernet modules, advanced dilemma video detection, thermal detection, 2070 controllers, CCTV traffic monitoring systems, SMFO cable, conduit, system integration, splice vaults, and fiber patch panels. These services were provided under Willdan’s on-call engineering contract. Ms. Alfonso was responsible for HSIP funding administration, including preparation and submission of Requests for Authorization, Award Package, progress invoices, and Final Report of Expenditures to Caltrans.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
15 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Chien-Chang Chen, PhD, PE, GE
Supervising Engineer
Project Role: Materials Testing
Profile Summary
Education: PhD, Geotechnical Engineering, Georgia Institute of Technology MS, Geotechnical Engineering, Georgia Institute of Technology BS, Civil Engineering, National Chiao Tung University, Taiwan Certifications: Geotechnical Engineer, California No. 3183 Civil Engineer, California No. C63238
Experience: 24 Years
Mr. Chien-Chang Chen has over 24 years of experience in geotechnical and earthquake engineering. He specializes in developing foundation recommendations for the design and construction of pipelines, transportation, power supplies, residential development, schools, and commercial structures including the mitigation of soft ground and liquefaction by ground improvement. Mr. Chen offers leadership in the provision of geotechnical interpretation, analysis, the development of geotechnical solutions and design production, including project management and business development. He has worked on a wide variety of engineering projects in the USA, New Zealand, and Taiwan.
Relevant Project Experience
Old River School Road Pavement Rehabilitation Project, City of Downey, CA. Materials Testing Manager.
Willdan provided construction management, inspection, material testing, and labor compliance services for the CIP Pavement Rehabilitation Project. Between Imperial Highway and Arnett Street, generally consists of the installation of traffic signal communications conduit and 32,000 LF of fiber-optic cables, pull boxes and termination panels; rehabilitation of existing pavement, including removal and reconstruction of asphalt concrete base course, cold milling existing asphalt pavement, placement of asphalt concrete leveling course and rubberized asphalt concrete overlay; replacement of non-standard curb ramps and uplifted or damaged curb and gutter and sidewalk in compliance with the Americans with Disabilities Act (ADA) requirements; implementation of Class II and Class III bike facilities; and replacement of incidental striping and signage.
Firestone at Lakewood Boulevard Water, Downey, California. Materials Testing Manager. Willdan provided Public Works Inspection and Materials Testing Services for this project which consisted of jack and boring under the railroad track, installing new services and hydrants along Firestone Blvd, and installing new pipeline on Lakewood Blvd.
CIP 23-20 4th Street Water, Downey, California. Public Works Observer. Willdan provided Public Works Inspection and Materials Testing Services for the 4th Street Water System Improvements Project which consisted of installation of new water mains, valves, fittings, and appurtenances, abandoning of old undersized water main, replacement of existing fire hydrants, installation of new fire hydrants, installation of new copper water service lines, replacement of old water meters with remote-read water meters, and completion of associated asphalt and concrete work on 4th Street from Paramount Blvd to La Reina Avenue.
CIP 23-19 6th Street Water, Downey, California. Materials Testing Manager. Willdan provided Public Works Inspection and Materials Testing Services for the 6th St Water System Improvements Project which consisted of trenching and backfill of new water mains and completion of associated asphalt and concrete work on 6th Street from Western Avenue to La Reina Avenue.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
16 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Relevant Projects and References
Within the past seven years, Willdan has completed task orders for over 200 on-call contracts with public agencies. This relevant experience of our dedicated and available key personnel includes both federal and non-federal projects – making Willdan highly suited to provide the County with the requested services.
Representative contracts are provided below. All pertinent client information, including contact information, has been included in the “Reference Contact Information” section.
On Call Construction Management and Inspection Services Client: City of Downey Dates: 2018- Present
Key Staff
Mike Bustos
Chris Baca
Mario Cisneros
Heleo Espinoza
Oscar Blanco
Simon Hernandez
Victor Ayala
Matt Saab
Mike Corral
Cris Valenzuela
Sam Moctezuma
Otis Chandler
Dwayne Mozden
Miguel Lopez
Chien-Cheng Chen
Contract Value: $500,000 Annually
Willdan has provided on call construction management and inspection services to the City of Downey since 2018 and has partnered with the City of Downey often over the past 25 years. Mr. Bustos, our proposed Project Manager for the City of Downey contract, served as Project Manager for each of these city projects. Representative construction management and inspection projects completed under this on call contract include Woodruff Ave Water System Improvements, Firestone Blvd and Paramount Blvd Intersection Improvements, Samoline Ave and Melva St Water System Improvements, Third St Water System Improvements, Lakewood Blvd Improvements Phase 3C, Lakewood Blvd at Firestone Blvd Water System Improvements, Solar Panel Installations at Multiple City Facilities, Old River School Rd Rehabilitation, Miscellaneous Sewer Repairs, Wilderness Park Sewer Repairs, 4th St Water System Improvements, 5th St Water System Improvements, and Stamps Rd Water System Improvements. Willdan provided construction inspection and materials testing services for each of these projects and construction management for some of these projects.
On Call Multidisciplinary Engineering Services
Client: City of Brea Dates: 2001- Present
Key Staff
Chris Baca
Saul Martinez
Ruben Durant
Mike Corral
Victor Ayala
Barry Knutson
Javier Ramirez
Jane Freij
Amanda Perez
Contract Value: $300,000 Annually
Willdan has provided on call engineering services to the City of Brea since 2019 and has partnered with the City of Brea often over the past 40 years across a variety of disciplines and services. Mr. Baca, our proposed Deputy Project Manager for the City of Downey contract, served as Project Manager for each of these city projects. Representative construction management projects completed under this on call contract include Country Hills Water, Country Hills Phase II, South Brea Sewer Labor Compliance, Drainage Improvements Labor Compliance, Steele Labor Compliance, CIP 7914 Skate Park, CIP 7968 Inspection, 57 Freeway/Lambert, ADA Improvements Labor Compliance, Civic Center Cameras, CIP 7323 Moorpark Labor Compliance, CIP 7959 Brea Creek Golf Course Labor Compliance, Berry & Imperial Highway, Permit
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
17 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
inspection, Alley Rehab 7319,7320, & 7321, and Puente Waterline. Willdan provided construction management, inspection, and materials testing services for each of these projects.
On Call Multidisciplinary Engineering Services
Client: City of Ridgecrest Dates: 2010- Present
Key Staff
Mike Bustos
Mario Cisneros
Anival Nunez
Paul Merrill
Oscar Blanco
Matt Saab
Chad Meelker
Masoud Eskandari
Amanda Perez
Jane Freij
Mike Corral
Chien-Cheng Chen
Contract Value: $1,000,000 Annually
Willdan has provided on call engineering services to the City of Ridgecrest since 2010. In that time, Willdan has completed over 75 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, grant administration, labor compliance, city engineering, landscape architectural, surveying, GIS, environmental clearance, building and safety.
We have provided these services to the City for projects funded with local, state, and federal funds.
Representative construction management and inspection projects completed under this on-call contract include Downs Street Widening (STPL), West Ridgecrest Boulevard Reconstruction (RPSTPL), Ridgecrest Senior Center Tenant improvements (CDBG), Electric Vehicle Charging Stations and Solar Photovoltaic Improvements (CMAQ), Corporate Yard Site Improvements, New Bus Maintenance Garage and Shade Structure (Design/Build), ADA Transition Plan (CDBG), Sewer System Rehabilitation and Repair Program, Sewer GIS mapping, Walmart Supercenter Offsite Improvements, Richmond Road Bike Path, Bowman Channel Improvements, Dolphin Avenue Improvements (CMAQ), SSARP, Traffic Signal Installation for China Lake Boulevard at Bowman Road (HSIP), Citywide Telecommunications Installation Permit Inspection, Flashing Stop Signs and Adaptive Traffic Signals (HSIP), and Leroy Jackson Park (Clean CA). On many of these projects, Willdan provided turnkey services including design, environmental, bidding assistance, construction management, inspection, labor compliance, grant administration and materials testing. Mr. Bustos, our proposed Project Manager for the City of Downey contract, served as Project Manager for each of these city projects. On Call Multidisciplinary Engineering Services Client: City of Inglewood Dates: 2006- Present
Key Staff
Mike Bustos
Mario Cisneros
Simon Hernandez
Matt Saab
Manny Trujillo
Jason Brown
Matthew Villegas
Carlos Villegas
Victor Ayala
Christopher Villegas
Miguel Lopez
Chien-Cheng Chen
Contract Value: $2,000,000 Annually
Willdan has provided on call engineering services to the City of Inglewood since 2011. In that time, Willdan has completed over 22 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, landscape architectural, surveying, and GIS. Representative construction management and inspection projects completed under this on call contract include La Brea Avenue Reconstruction (DEMO4L), La Brea Avenue Realignment and
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
18 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Reconstruction (HPLUL), Annual Streets and Alleys Rehabilitation, Imperial Highway Improvements, Prairie Avenue Improvements, Van Ness Avenue Improvements, Inglewood Intermodal Transit/Park and Ride Facility, Service Center Yard Roofing Project, Intelligent Transportation System Gap Closure, Intelligent Transportation System Phases 5 & 6, Los Angeles World Airports Intelligent Transportation System, City Parking Lots Rehabilitation, La Brea and Hardy Traffic Signal Improvements, Century Boulevard Mobility Project Federal Funding Closeout Services, La Tijera Elementary School Improvements (SR2S), and Encroachment Permits Inspection. Mr. Bustos, our proposed Project Manager for the City of Downey contract, served as Project Manager for each of these city projects.
On Call Construction Management and Inspection Services Client: City of La Puente Dates: 2009 - Present
Key Staff
Mike Bustos
Chris Baca
Roy Shaver
Jason Brown
Simon Hernandez
Victor Ayala
Masoud Eskandari
Mohammad Samiee
Mike Corral
Otis Chandler
Dwayne Mozden
Chien-Cheng Chen
Contract Value: $500,000 Annually
Willdan has provided on call construction management and inspection services to the City of La Puente since 2009 and has partnered with the City of La Puente often over the past 15 years. Mr. Baca, our proposed Deputy Project Manager for the City of Downey contract, served as Project Manager for each of these city projects. Representative construction management and inspection projects completed under this on call contract include FY 22/23 Street Improvements, Federally Funded Street Improvements on Various City Streets, HSIP Traffic Signal Safety Improvements on Amar Road, Community Center Parking Lots, Bus Shelter Replacements, ROW Improvements at Elliott Avenue and Amar Road, Ian Skate Park, LED Street Name Signs Replacement, 2019 Citywide Slurry Seal, and Public Works Yard Access Road.
Willdan provided construction management, construction inspection and materials testing services for each of these projects.
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
19 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
References
Public Agency: City of Ridgecrest
Address: 100 West California Avenue, Ridgecrest, CA 93555 Contact: Travis Reed, City Engineering/Public Works Director/Deputy City Manager Phone/Email: (661) 478-1965, [email protected]
Public Agency: City of Inglewood
Address: One Manchester Boulevard, Inglewood, CA 90301
Contact: Peter Puglese, City Traffic Engineer
Phone/Email: (908) 578-4226, [email protected] Public Agency: City of Brea
Address: One Civic Center Circle, Brea, CA 92821
Contact: Michael Ho, Director of Public Works/City Engineer Phone/Email: (562) 570-6383, [email protected]
Public Agency: City of Downey
Address: 11111 Brookshire Avenue, Downey, CA 90241
Contact: Lorena Powell, Senior Civil Engineer
Phone/Email: (562) 904-7110, [email protected]
Public Agency: City of La Puente
Address: 15900 Main Street, La Puente, CA 91744
Contact: John DiMario, Development Services Director
Phone/Email: (626) 855-1517, [email protected]
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
20 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Project Management
Willdan has had two primary objectives since our inception in 1964:
Ensuring the success of our clients
Enhancing their communities
Working steadily toward these goals we gained a notable reputation for project understanding, technical excellence, cost effectiveness, and client responsiveness. It is these attributes that our construction management and inspection team bring to each project. To these primary objectives, we add individual project-oriented goals that include:
Ensuring Project Success – Provide City and contractor with constant input and feedback affecting projects
Community Enhancement – Monitor project for conformance to City’s high standards Impeccable Recordkeeping – Maintain construction files pursuant to City, Willdan, and Caltrans Local Assistance Procedures Manual
Rigorous Budget Control – Provide biweekly construction budget updates to City Project Manager
Maintain Schedule – Provide weekly schedule updates and ensure contractor complies with project schedule requirements
Resident and Business Satisfaction – Provide initial project flyers and periodic updates to businesses and residents affected by the project; set up project hotline for high profile CIP projects that impact a significant number of citizens; ensure project is well maintained and project traffic controls are installed per project plans, CAMUTCD, and City requirements Project Approach
Willdan’s approach to construction management starts with assigning the appropriate staff to fit the assignment’s needs. For construction projects, the primary team members will include a construction manager and the project inspector. Our management team will work closely with the City’s Project Manager to assign the most qualified individuals to each project. To achieve these goals, Willdan’s approach to management and inspection of the City’s construction projects includes:
Thorough review of project specifications and plans
Initial set-up of project-specific construction management files Identify and address key project issues prior to start of construction Agree on project-specific quality assurance program
Identify and coordinate with outside utility agencies and/or permitting agencies impacted by the projects
Arrange preconstruction meeting and process RFIs and submittals in a timely manner Maintain detailed project records and provide weekly/monthly reports Arrange weekly project meetings to review and address project issues Provide qualified inspectors to closely monitor contractor's work and progress Provide detailed inspection reports of developer/contractor’s daily activities Promptly respond to resident and business complaints and questions Provide final project close-out documents conforming to City, Willdan, and other concerned parties
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
21 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
There are many routine aspects that are common to the way every construction project is performed in terms of construction administration and inspection of development, permitted, and capital improvement projects as outlined in our scope and in the diagram below:
Willdan adopted the Caltrans' Construction Manual as our in-house quality standard and have incorporated Caltrans' prescribed standards and procedures into our everyday inspection routine. This ensures we meet federal and state guidelines from the start. To supplement the Caltrans Construction Manual, we have also developed checklists as a means of quality control for our typical project field files, federally funded project documentation, BMP inspections, slurry seal inspections, ARHM paving inspections, water main inspections, and traffic signal inspections.
Communication Approach: Willdan recognizes that effective, ongoing, cooperative communication between all parties over the course of any project is essential to successful completion. This communication starts with a project kick-off meeting where the objectives and expectations of the City for the project are clearly articulated and understood by Willdan.
In addition, agreed-upon methods and scheduling of formal reporting are established with identification of individuals to be involved in the project's decision-making process. This sets forth accountability and responsibility for informing and facilitating the project. As the project progresses, communication continues through regular correspondence, teleconference discussions, and meetings with City staff to keep City staff apprised of the project status. Clear and concise progress updates are provided. Emails and teleconferences are utilized whenever possible and appropriate to minimize City staff time spent in meetings.
Constructability Review Approach: Willdan will perform an independent review of plans, specifications, and cost estimates. These reviews will focus on constructability, inter-disciplinary coordination, completeness, and general code compliance. Our typical Constructability Review Process is shown in the flowchart below. Depending on the size and complexity of the project, reviews may be conducted at 60% and/or 90% design levels.
At the 60% Review stage, it is not anticipated that the design elements will be fully detailed on the construction documents, so the approach to this review will be to primarily focus on big picture elements, such as the general design approach, identifying potential utility conflicts, correcting items that have been completed, identifying obscure, easy to miss details, such that they can be captured in the 90% submittal, and making recommendations regarding value engineering, construction phasing, and contracting mechanism before the design gets too far along and renders these types of changes cost- or schedule-
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
22 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
prohibitive. The 60% Review will include an initial site visit to get familiar with the proposed project site, identify any current field conditions not reflected on the Plans, and identify any site access constraints.
The Lead Constructability Reviewer will take time to review the plan set it totality to visualize how the whole puzzle fits together. He will conduct a cursory review of the sheet index and each of the plan sheets.
That will allow him to visualize the construction process in a step by step manner, as if building the project conceptually in his mind and logically discover if there are any incorrect or missing elements or documents.
The 60% Review will also entail looking at the footprints of various construction elements and keying in on their perimeters where interfaces with other trades, components, utilities, and systems occur.
At the 90% Review stage, the construction documents are expected to be much more developed and near completion. Therefore, our approach to the 90% review will be to provide a much more detail-oriented review, including specifications, bid items, and engineer’s estimate. It will begin with back-checking the 60% review comments to ensure they have been adequately responded to by the Design Team. Then, the plan sheets and specification sections with specialty items, such as electrical, instrumentation, mechanical, stormwater, etc. will be distributed amongst the various team members who have an expertise in that particular field. The Lead Constructability Reviewer will focus their review on civil and water improvements, and interdisciplinary coordination. The 90% review will include specifications, bid schedule, and engineer’s estimate. Measurement and payment sections and bid schedules will be compared to each other to ensure that each item specified on the plans is attributable to a bid item, with a complete description of the work covered under that bid item. Each disciplinary reviewer will review the relevant specification sections that pertain to their field to ensure that the technical specifications are complete and correlate properly to the Plans. Quantity takeoffs will be performed using Revu Bluebeam to calculate linear footages, areas, and per each quantities for unit price bid items. Construction notes and measurements corresponding to separate bid items will be color coded in Bluebeam to ensure that every construction element is covered by a bid item, without overlap.
Deliverables for review comments will be provided in a tabulated form utilizing Microsoft Excel, complemented by a marked-up pdf, utilizing text features in Bluebeam Revu to support and clarify the tabulated comments. The spreadsheet includes the reviewer’s initials sheet/page number, detail number/spec section, comment, and provide a column for Designer’s written response.
Constructability Review Process Flow Chart
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
23 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
Contractor Compliance: Our staff has extensive experience with a myriad of public works projects and has a clear understanding of the issues surrounding inspection of the work. For example, when constructing sidewalks and ADA-compliant ramps, our team will ensure adequate subgrade compaction has been achieved. They will monitor the work for conformance with the plans, specifications, and ADA requirements. The concrete tickets will be checked to ensure materials match the approved mix design. A smart level will be used to check forms and the contractor will not be approved to place concrete until the work meets all City and other applicable standards. Willdan’s team will monitor the contractor’s operations for conformance with City compaction standards by working with the material testing lab and will not accept any trench backfill or allow any pavement repair until proper compaction is verified by the lab. Soils Technicians are dispatched to job sites on an as needed basis for testing purposes, to verify conformance to the contract requirements.
Project Budgets: Construction costs are proactively managed and tracked against available budgets by our Construction Managers. This starts with an initial quantity takeoff from the construction plans, utilizing Bluebeam Revu, serving as an independent audit of the project quantities as they correlate to the bid schedule quantities. Early identification of potential quantity busts and continual monitoring of quantities throughout construction is key to maintaining project costs within established budgets. Our team creates and maintains change order logs and final cost projection spreadsheets on a weekly basis to document and track all quantity adjustments, approved change orders, pending change orders, and potential change orders. The City’s Project Manager is kept abreast of the project budget status throughout construction so that adjustments can be made to the scope of the project, or proper procedures can be followed to request additional funding, if needed to stay within the established contingencies. Willdan’s team also focuses on quickly processing RFIs and change order requests and providing direction to the Contractor as needed to keep them moving and avoid costly delays.
Scheduling: The contractor’s critical path method baseline schedule will be reviewed and accepted prior to issuance of a notice to proceed. The schedule will identify major items of work and will be the vehicle for monitoring, controlling, and tracking progress. The schedule will be required to be updated monthly to reflect actual and forecasted completions. This allows our construction managers to anticipate and forecast potential issues and develop an advanced strategy to proactively mitigate problems before they impact the schedule. In instances where schedule delays are expected to occur, due to weather, approval requirements or information from an outside agency, material shortages, or other unanticipated factors, the City’s Project Manager will be immediately notified of the potential project delay. Strategies will be developed and implemented to resolve project challenges and expedite the approval of the affected projects. As the Project Manager, Mr. Bustos will monitor all progress on a weekly basis.
Cloud-Based Construction Management: If our clients do not have their own preferred construction management software, Willdan utilizes our subscription to the cloud-based application Virtual Project Manager (VPM), to manage the paperwork and record keeping on CIP projects. We are aware from our past involvement with City of Downey projects, that the City utilizes Procore construction management software. Whether using VPM or Procore, Willdan’s construction management and inspection staff is very familiar with utilizing a cloud-based system. Upon startup of a new construction project, the project is added to the cloud-based site and the appropriate team members from the City, Contractor, Designer, and Willdan’s staff will be provided access to that project’s site, with varying levels of permission on the types of documents each team member has access to. Contractor RFIs and submittals are provided through the cloud-based software, assigned to an appropriate team member, comments or responses are uploaded to the website, and all parties are notified via email when the document is uploaded. The cloud-based application automatically creates and maintains logs to track the
Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
24 City of Downey – Proposal for On-Call Public Works Construction Management, Inspection, and Materials Testing Services
status of each submittal and RFI. Given that Willdan utilizes a construction management software, similar to Procore, for nearly all CIP construction projects we manage, there is very little, if any, learning curve to working within the City’s Procore system. Willdan also utilizes a combination of softwares, including Microsoft Office and Bluebeam Revu to perform constructability reviews, perform quantity takeoffs, and perform contract administration duties.
Customer Service: To meet and often exceed the expectations of our clients, Willdan fosters and instills a corporate culture of Customer-First among our staff and in our day-to-day work environment. Looking out for our customer’s best interests is at the forefront of everything we do. Our customer-focused philosophy is particularly evident when dealing with complex situations and difficult to resolve challenges.