Cities Index.
Agenda packet

Dublin City Council
January 10, 2023

Document
Agenda packet
Meeting
January 10, 2023
Body
Dublin City Council
Pages
128
Original file
194.2 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

January 10, 2023 Dublin City Council Regular Meeting Agenda 1 COUNCILMEMBERS City Council Chamber
Melissa Hernandez, Mayor Dublin Civic Center
Michael McCorriston, Vice Mayor 100 Civic Plaza
Jean Josey, Councilmember Dublin, CA 94568
Dr. Sherry Hu, Councilmember www.dublin.ca.gov
Kashef Qaadri, Councilmember

REVISED AGENDA
Regular Meeting of the

DUBLIN CITY COUNCIL
Tuesday, January 10, 2023 Location: Council Chamber
100 Civic Plaza
Dublin, CA 94568
CLOSED SESSION 6:30 PM
REGULAR MEETING 7:00 PM
Pursuant to AB 361, the City is authorized to hold public meetings via teleconferencing and to make public meetings accessible telephonically or otherwise electronically to all members of the public, without making available any physical location for the public.

Additional Meeting Procedures Available During the COVID-19 Pandemic This City Council meeting will be broadcast live on Comcast T.V. channel 28 beginning at 7:00 p.m. This meeting will also be livestreamed at www.tv30.org and on the City’s website at: https://dublin.ca.gov/ccmeetings Members of the public who wish to participate in the meeting electronically have the option of giving public comment via Zoom, subject to the following procedures:
 Fill out an online speaker slip available at www.dublin.ca.gov. The speaker slip will be made available at 10:00 a.m. on Tuesday, January 10, 2023. Upon submission, you will receive Zoom link information from the City Clerk. Speakers slips will be accepted until the public comment period ends, or until the public comment period on non-agenda items is closed.
 Once connected to the Zoom platform using the Zoom link information from the City Clerk, the public speaker will be added to the Zoom webinar as an attendee and muted. The speaker will be able to observe the meeting from the Zoom platform.  When the agenda item upon which the individual would like to comment is addressed, the City Clerk will announce the speaker in the meeting when it is their time to give public comment. The speaker will then be unmuted to give public comment via Zoom.
1 January 10, 2023 Dublin City Council Regular Meeting Agenda 2 CLOSED SESSION 6:30 PM
I. CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: Portion of Assessor’s Parcel No. 986-0028-003-00 adjacent to Tassajara Road Agency Negotiator: Linda Smith, City Manager
Negotiating Parties: East Bay Regional Park District
Under Negotiation: Price and terms of payment
II. CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: Portion of Assessor’s Parcel No. 986-0028-002-00 adjacent to Tassajara Road Agency Negotiator: Linda Smith, City Manager
Negotiating Parties: Javid Roshan/Zarmina Mayar
Under Negotiation: Price and terms of payment
III. CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: Portion of Assessor’s Parcel No. 986-0001-001-07 adjacent to Tassajara Road Agency Negotiator: Linda Smith, City Manager
Negotiating Parties: United States of America
Under Negotiation: Price and terms of payment
IV. CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: Portion of Assessor’s Parcel No. 986-0003-001-02 adjacent to Tassajara Road Agency Negotiator: Linda Smith, City Manager
Negotiating Parties: Kathy L. Betran
Under Negotiation: Price and terms of payment
REGULAR MEETING 7:00 PM

1. REPORT ON CLOSED SESSION

2. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

3. ORAL COMMUNICATIONS

3.1 2022 Sponsor Recognition
The City Council will recognize sponsors who contributed to City events, programs, and facilities in 2022.

STAFF RECOMMENDATION:

Recognize the 2022 sponsors.

Staff Report
Attachment 1 - 2022 City of Dublin Sponsorship List
Item 3.1 PowerPoint Presentation

3.2 Recognition of Parks Reserve Forces Training Area 80th Anniversary The City Council will recognize Parks Reserve Forces Training Area’s 80th Anniversary.

STAFF RECOMMENDATION:

Present Certificate of Recognition to Parks Reserve Forces Training Area.

Staff Report
Attachment 1 - Certificate of Recognition
2 January 10, 2023 Dublin City Council Regular Meeting Agenda 3

3.3 Recognition of the 2022 “Deck the Homes” Holiday Home Decorating Contest Winners
The City Council will receive a presentation on the 2022 “Deck the Homes” Holiday Home Decorating Contest and present Certificates of Recognition to the winners.

STAFF RECOMMENDATION:

Present Certificates of Recognition to the 2022 “Deck the Homes” Holiday Home Decorating Contest winners.

Staff Report
Attachment 1 - 2022 Holiday Home Decorating Winners
Attachment 2 - 2022 Home Holiday Decorating Contest Flyer Item 3.3 PowerPoint Presentation

3.4 Employee Introductions
New City of Dublin Staff members, Gabrielle Abdon, Associate Civil Engineer, with the Public Works Department, and Gary Gosal, Captain, with Dublin Police Services, will be introduced.

STAFF RECOMMENDATION:

Welcome the new City of Dublin Staff members.

Staff Report

3.5 Public Comment
At this time, the public is permitted to address the City Council on non-agendized items. Please step to the podium and clearly state your name for the record. COMMENTS SHOULD NOT EXCEED THREE (3) MINUTES. In accordance with State Law, no action or discussion may take place on any item not appearing on the posted agenda. The Council may respond to statements made or questions asked, or may request Staff to report back at a future meeting concerning the matter. Any member of the public may contact the City Clerk’s Office related to the proper procedure to place an item on a future City Council agenda. The exceptions under which the City Council MAY discuss and/or take action on items not appearing on the agenda are contained in Government Code Section 54954.2(b)(1)(2)(3).

4. CONSENT CALENDAR
Consent Calendar items are typically non-controversial in nature and are considered for approval by the City Council with one single action. Members of the audience, Staff or the City Council who would like an item removed from the Consent Calendar for purposes of public input may request the Mayor to remove the item.

4.1 Approval of the December 20, 2022 Regular City Council Meeting Minutes The City Council will consider approval of the minutes of the December 20, 2022 Regular City Council Meeting.

STAFF RECOMMENDATION:

Approve the minutes of the December 20, 2022 Regular City Council Meeting.

Staff Report
Attachment 1 - December 20, 2022 Regular City Council Meeting Minutes

4.2 Youth Mini-Grant Funding Recommendations Approval
The City Council will consider approving the Youth Advisory Committee Mini-Grant Program recommended funding allocations.

STAFF RECOMMENDATION:

Adopt the Resolution Approving Funding Recommendations for Fiscal Year 2022-23 for the Youth Advisory Committee Mini-Grant Program.
3 January 10, 2023 Dublin City Council Regular Meeting Agenda 4 Staff Report
Attachment 1 - Resolution Approving Funding Recommendations for Fiscal Year 2022-23 Youth Advisory Committee Mini-Grant Program
Attachment 2 - YAC Mini-Grant Rating Form
Attachment 3 - Fiscal Year 2022-23 Mini-Grant Applications and Proposals

4.3 Approval of Plans and Specifications and Award of Contract to St. Francis Electric., Inc. for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713 The City Council will consider approving the plans and specifications and awarding a construction contract to St. Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713. The project will install a three-inch conduit on Dublin Boulevard between the Civic Center and San Ramon Road. This project is exempt under Section 15302 (Replacement and Reconstruction) of the CEQA Guidelines.

STAFF RECOMMENDATION:

Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to St. Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713.

Staff Report
Attachment 1 - Resolution Approving the Plans and Specifications and Awarding a Contract to St. Francis Electric for the Citywide Signal Communications Upgrade Attachment 2 - CIP ST0713
Attachment 3 - Bid Results

4.4 Agreement for Water Slide Maintenance Services at The Wave The City Council will consider an agreement with Slide Guys Restoration Inc. for waterslide maintenance services at The Wave.

STAFF RECOMMENDATION:

Adopt the Resolution Approving an Agreement with Slide Guys Restoration Inc. for Waterslide Maintenance Services and approve the budget change.

Staff Report
Attachment 1 - Resolution Approving an Agreement with Slide Guys Restoration Inc. for Waterslide Maintenance Services
Attachment 2 - Exhibit A to the Resolution - Agreement Between the City of Dublin and Slide Guys Restoration Inc.

Attachment 3 - Proposal - Slide Guys Restoration Inc.

Attachment 4 - Request for Proposals
Attachment 5 - Budget Change Form

4.5 Acceptance of Work – Project No. GI0119, Civic Center HVAC and Roof Replacement Project
The City Council will consider the acceptance of the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119. The project included the replacement of the flat roof assembly, roof-mounted HVAC equipment, modifications to the existing HVAC duct system, HVAC controls, minor structural upgrades, fire alarm panel and ancillary devices, T-bar ceilings and recessed lighting, interior painting, and new ethernet data cable drops.
4 January 10, 2023 Dublin City Council Regular Meeting Agenda 5 STAFF RECOMMENDATION:

Adopt the Resolution Accepting the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119.

Staff Report
Attachment 1 - Resolution Accepting the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119
Attachment 2 - CIP No. GI0119

4.6 Avalon West/St. Patrick’s Way Development Public Art The City Council will consider approving AvalonBay Communities proposal for public art at the Avalon West/St. Patrick’s Way development project that is now under construction.

The proposed artwork, designed by artist Norie Sato, is adjacent to the new residential building and would parallel the north side of St. Patrick’s Way, between Golden Gate Drive and Regional Street.

STAFF RECOMMENDATION:

Approve the artwork proposal by AvalonBay Communities for the Avalon West/St.

Patrick’s Way development project.

Staff Report
Attachment 1 - Artwork Design Proposal by Artist Norie Sato

4.7 Authorizing Remote Meetings of City Council and City Commissions Due to Increase in COVID-19 Cases
From March 2020 through September 2021, the City conducted meetings of its legislative bodies remotely pursuant to various executive orders that suspended certain Brown Act provisions. In October 2021, the City returned to in-person meetings and the Brown Act was amended to allow for teleconferencing during a state of emergency. Under the new law, AB 361, the City can continue to conduct virtual meetings where the Governor has proclaimed a State of Emergency, or state or local health officials have imposed or recommended social distancing, if the City Council makes certain required findings.

From January 11 – February 10, 2022, and since May 3, 2022, the City Council has operated under a resolution pursuant to AB 361 authorizing teleconferenced meetings for at least 30 days. The City Council will consider adopting a resolution that would allow for virtual attendance for the next 30 days.

STAFF RECOMMENDATION:

Adopt the Resolution Finding That There is a Proclaimed State of Emergency; Finding That Meeting in Person Would Present Imminent Risks to the Health or Safety of Attendees as a Result of the State of Emergency; and Authorizing Remote Teleconferenced Meetings of the Legislative Bodies of the City of Dublin Pursuant to AB 361.

Staff Report
Attachment 1 - Resolution Finding That There is a Proclaimed State of Emergency; Finding That Meeting in Person Would Present Imminent Risks to the Health or Safety of Attendees as a Result of the State of Emergency

4.8 Authorize the City Manager to Execute Parcel Map 10999 as Property Owner The City Council will consider authorizing the City Manager to execute Parcel Map 10999 as property owner to allow for the merger and subdivision of parcels for Don Biddle Community Park.

STAFF RECOMMENDATION:
5 January 10, 2023 Dublin City Council Regular Meeting Agenda 6 Adopt the Resolution Authorizing the City Manager to Execute the Owner’s Statement of Parcel Map 10999 on Behalf of the City of Dublin.

Staff Report
Attachment 1 - Resolution Authorizing the City Manager to Execute the Owners Statement of Parcel Map 10999 on Behalf of the City of Dublin
Attachment 2 - Parcel Map 10999

4.9 Annual Proclamation
The City Council will review the Official Proclamation List and consider approval of the Annual Proclamation.

STAFF RECOMMENDATION:

Accept the Official Proclamation List and approve the Annual Proclamation.

Staff Report
Attachment 1 - Official List of Proclamations
Attachment 2 - City of Dublin Annual Proclamation

5. WRITTEN COMMUNICATION – None.

6. PUBLIC HEARING

6.1 Bicycle and Pedestrian Plan Update
The City Council will hold a public hearing to review and consider adopting the proposed update to the City’s Bicycle and Pedestrian Plan. This includes an exemption from review under the California Environmental Quality Act. The proposed Plan updates and replaces the 2014 Bicycle and Pedestrian Master Plan and will inform future infrastructure, program, and policy recommendations.

STAFF RECOMMENDATION:

Conduct the public hearing, deliberate, and adopt the Resolution Adopting the Bicycle and Pedestrian Plan and Finding the Plan Exempt From the California Environmental Quality Act.

Staff Report
Attachment 1 - Resolution Adopting the Bicycle and Pedestrian Plan and Finding the Plan Exempt from the California Environmental Quality Act
Attachment 2 - Exhibit A to Resolution - CEQA Exemption Eligibility Memo Attachment 3 - Exhibit B to Resolution - Draft Dublin Bicycle and Pedestrian Plan Attachment 4 - Appendices to Draft Dublin Bicycle and Pedestrian Plan Attachment 5 - Planning Commission Resolution No. 22- 15 Recommending that the City Council Adopt the Bicycle and Pedestrian Plan and Find the Plan Exempt from the California Environmental Quality Act
Item 6.1 PowerPoint Presentation

7. UNFINISHED BUSINESS

7.1 Local Roadway Safety Plan
The City Council will receive a report and consider adopting the Local Roadway Safety Plan, which provides a local-level assessment of roadway safety and identifies high-risk locations, appropriate safety improvements, and strategies to improve safety for roadways in the City of Dublin.
6 January 10, 2023 Dublin City Council Regular Meeting Agenda 7 STAFF RECOMMENDATION:

Adopt the Resolution Adopting the Local Roadway Safety Plan and Finding the Plan Exempt From the California Environmental Quality Act.

Staff Report
Attachment 1 - Resolution Adopting the Local Roadway Safety Plan and Finding the Plan Exempt from the California Environmental Quality Act
Attachment 2 - Exhibit A to the Resolution - Draft Local Roadway Safety Plan Attachment 3 - Appendices to the Local Roadway Safety Plan Attachment 4 - CIP Project No. ST0122 Local Roadway Safety Plan Attachment 5 - CIP Project No. ST0123 Traffic Signal and Safety Improvements Item 7.1 PowerPoint Presentation

8. NEW BUSINESS

9. OTHER BUSINESS
Brief information only reports from City Council and/or Staff, including committee reports and reports by City Council related to meetings attended at City expense (AB1234).

10. ADJOURNMENT
This AGENDA is posted in accordance with Government Code Section 54954.2(a) If requested, pursuant to Government Code Section 54953.2, this agenda shall be made available in appropriate alternative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Section 12132) (ADA), and the federal rules and regulations adopted in implementation thereof. To make a request for disability-related modification or accommodation, please contact the District Clerk’s Office (925) 833-6650 at least 72 hours in advance of the meeting. Upon receiving a request, the District will swiftly resolve requests for reasonable accommodation for individuals with disabilities, consistent with the federal ADA, and resolve any doubt in favor of accessibility.

Agenda materials that become available within 72 hours in advance of the meeting, and after publishing of the agenda, will be available at Civic Center, 100 Civic Plaza, and will be posted on the District’s website at www.dublin.ca.gov/ccmeetings.

Mission
The City of Dublin promotes and supports a high quality of life, ensures a safe and secure environment, fosters new opportunities, provides equity across all programs, and champions a culture of diversity and inclusion.
7 STAFF REPORT

CITY COUNCIL

Page 1 of 2 ends

Agenda Item 3.1
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: 2022 Sponsor Recognition
Prepared by: Lauren Marriott, Recreation Coordinator
EXECUTIVE SUMMARY:

The City Council will recognize sponsors who contributed to City events, programs, and facilities in 2022.

STAFF RECOMMENDATION:

Recognize the 2022 sponsors.

FINANCIAL IMPACT:

The City received over $95,620 in cash sponsorships and $18,426 in in-kind sponsorships in 2022.

Sponsorships help offset the cost of producing special events and operating City programs and facilities, reducing the overall impact on the General Fund.

DESCRIPTION:

Through its Donation and Sponsorship Policy, the City invites and encourages local businesses and corporations to partner as sponsors of the City, providing cash or in-kind contributions to support City events, programs, and facilities in exchange for appropriate sponsorship recognition.

Sponsors who contributed in 2022 are listed in Attachment 1.

The City Council does not need to take any action beyond recognizing the sponsors. According to the Donation and Sponsorship Policy adopted by the City Council in 2017, the City Council is only required to formally accept individual donations that exceed $45,000.

STRATEGIC PLAN INITIATIVE:

None.
8

Page 2 of 2 ends

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted.

ATTACHMENTS:
1) 2022 City of Dublin Sponsor List
9 EVENT OR DEPARTMENT CASH IN‐KIND ITEM
5421 at Dublin Station‐UDR Apartments $4,000
Alamo Ace Hardware $6,000
Barker Heating and Cooling $2,000
Baylight Baptist Church $2,000
Dublin Pediatric Dentistry and Orthodontics $2,000
Dublin United Soccer League $2,000
East Bay Community Energy $2,000
Empower Martial Arts $2,000
Foothill Chiropractic $2,000
Half Price Books $2,000
Joya $2,000
KeyPoint Credit Union $2,000
Lucky California $4,000
Madden Marketing/Bay Area News Group $2,000
Patelco Credit Union $1,000
Safeway $4,000
Sameer Hakim Remax $4,000
Solar Bill $2,000
Sutter Health $2,000
Welk Resorts $2,000
Xfinity $2,000
Challenge Dairy $750
IBEW $750
INC 82 Brewing $500 gift cards
Joya $750
Logo Boss $750
Orange Theory $750
Pacific Catch $250
Stanford Children's Health $750
Half Price Books $370
California Renewable Energy $2,000
Dimen Group Inc $4,000
Joya $1,000
KeyPoint Credit Union $850
Provident Credit Union $2,000
Tree Lighting
Cool Earth Solar $350
Go‐Green Driving School $350
Grace Life Church $350
Joya $350
Madden Marketing/Bay Area News Group $350
New Life Church $250
2022 Donations & Sponsorships
St. Patrick's Day Celebration
Shamrock 5K Fun Run and Walk
Splatter
Attachment 1
10 Dublin Pediatric Dentistry and Orthodontics $500
Kids Care Dental and Orthodontics $500
Dublin Pediatric Dentistry and Orthodontics $500
Empower Martial Arts $500
Madden Marketing/Bay Area News Group $500
5421 at Dublin Station‐UDR Apartments $2,000
American Swim Academy $600
Empower Martial Arts $1,300
Foothill Chiropractic $2,000
Grace Life Church $600
Joya $3,000
KeyPoint Credit Union $1,400
Landmark Exteriors $350
Madden Marketing/Bay Area News Group $300
Poppy Bank $350
Solar Bill $900
WellNest $600
Grace Life Church $250
Joya $350
Joya $200
Madden Marketing/Bay Area News Group $150
5421 at Dublin Station‐UDR Apartments $100
Empower Martial Arts $700
Poppy Bank $350
Sutter Health $700
Empower Martial Arts $500
KeyPoint Credit Union $250
Aetna $1,000
Dublin Senior Foundation $15,826 9 sets of  patio furniture Kaiser Permanente $1,800 Bi‐Weekly Visits
KeyPoint Credit Union $150 Raffle Gifts
Sunrise of Pleasanton $150 Raffle Gifts
Altamont Cruisers $3,000
American Realty Advisors $1,000
Darly L. Paulson $200
Hines $1,000
TOTAL $95,620 $18,426
Harvest Fair
Dublin Police Services
Economic Development
Farmers' Market
Breakfast with Santa
Floating Pumpkin Patch
Picnic Flix
Trail Challenge
Senior Center
Spring Eggstravaganza
11 2022 Sponsor Recognition
January 10, 2023
City Council Meeting – Item 3.1
12 2022 Sponsorship Overview
• $95,620 received in cash sponsorships.
• $18,426 received in in-kind sponsorships.
• Funds and donated goods are used to offset the
costs of producing special events and running
programs, facilities and services.
13 St. Patrick’s Day Celebration
14 Spring Eggstravaganza
15 Farmers Market &
Summer Concert Series
16 Picnic Flix
17 Splatter
18 Fall Events
19 Holiday Events
20 Senior Center
21 Thank You!
22 STAFF REPORT

CITY COUNCIL

Page 1 of 1 ends

Agenda Item 3.2
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Recognition of Parks Reserve Forces Training Area 80th Anniversary Prepared by: Cierra Fabrigas, Executive Aide
EXECUTIVE SUMMARY:

The City Council will recognize Parks Reserve Forces Training Area’s 80th Anniversary.

STAFF RECOMMENDATION:

Present Certificate of Recognition to Parks Reserve Forces Training Area.

FINANCIAL IMPACT:

None.

DESCRIPTION:

On January 19, 2023, Parks Reserve Forces Training Area is celebrating their 80th Anniversary in the City of Dublin.

STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted.

ATTACHMENTS:
1) Certificate of Recognition
23 Attachment 1

CERTIFICATE OF RECOGNITION
is given to the

PARKS RESERVE FORCES TRAINING AREA
In celebration of its 80th anniversary, and for its long-standing partnership with the City and the continued support it provides to the community, the City of Dublin congratulates and commends the PRFTA team.

Presented by the
City Council of the City of Dublin
Dated: January 10, 2023
Mayor Melissa Hernandez Vice Mayor Michael McCorriston

Councilmember Sherry Hu Councilmember Jean Josey Councilmember Kashef Qaadri 24 STAFF REPORT

CITY COUNCIL

Page 1 of 2 ends

Agenda Item 3.3
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Recognition of the 2022 “Deck the Homes” Holiday Home Decorating Contest Winners
Prepared by: Tyler Phillips, Heritage and Cultural Arts Supervisor EXECUTIVE SUMMARY:

The City Council will receive a presentation on the 2022 “Deck the Homes” Holiday Home Decorating Contest and present Certificates of Recognition to the winners.

STAFF RECOMMENDATION:

Present Certificates of Recognition to the 2022 “Deck the Homes” Holiday Home Decorating Contest winners.

FINANCIAL IMPACT:

Expenses for the program are included in the annual operating budget.

DESCRIPTION:

The “Deck the Homes” Holiday Home Decorating Program is intended to encourage and celebrate those residents who decorate their homes for the holidays. The Parks and Community Services Department organizes the program and utilizes the Parks and Community Services Commissioners as judges. The program was introduced in 2018, making 2022 its fifth season.

Individual homes are judged in six categories. Winners receive a yard sign, a $50 gift card to a local business, and a certificate of recognition from the City Council. 2022 “Deck the Homes” Program
To promote the Holiday Home Decorating Contest, Staff utilized the City’s website and social media platforms and sent invitations to past participants. The deadline for submissions was December 9, 2022.
25

Page 2 of 2 ends

Fifteen applications were received, totaling 25 different entries. Commissioners from the Parks and Community Services Commission individually judged participating homes by visiting the locations December 12-16, 2022.

At its December 19, 2022 meeting, the Commission voted on category winners. Contest winners were notified on December 20, 2022, and received yard signs to display and a gift card from a local business. The homes were judged based on the following categories and criteria:
 Seen from Space Award - Best use of lights and color
 Winter Wonderland Award - Best use of music, movement, and technology  Gingerbread House Award – Best use of homemade decorations  Over Inflated - Best use of inflatables
 Deck the Halls Award - Best condo/apartment
 Candy Cane Lane Award - Best neighborhood – three or more homes Photos of the 2022 contest winners are included with this Staff Report (Attachment 1).

Deck the Homes Winners
Award Categories Number of Entries Winning Home Address Seen from Space 9 7574 Sutton Lane
Winter Wonderland 4 7287 Bedford Way
Gingerbread House 1 11913 Bloomington Way
Over Inflated 7 11319 Champagne Place
Deck the Halls 2 3654 Avaino Way
Candy Cane Lane 2 7964 Gunshot Court
STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted.

ATTACHMENTS:
1) 2022 Holiday Home Decorating Contest Winners
2) 2022 Holiday Home Decorating Contest Flyer
26 2022 “Deck The Homes”
Holiday Home Decorating Contest
WINNERS!
Attachemnt 1
27 Seen From Space Award
Bonato Family – 7574 Sutton Ln.

Best use of lights and color
Attachemnt 1
28 Winter Wonderland Award Brandt
Family – 7287 Bedford Way
Best use of music, movement, & technology
Attachemnt 1
29 Gingerbread House Award
Gasper Family - 11913 Bloomington Way
Best use of homemade decorations
Attachemnt 1
30 Over Inflated Award
Valdez Family – 11319 Champagne Pl.

Best use of inflatables
Attachemnt 1
31 Deck the Halls Award
Dhot Family – 3654 AvainoWay
Best Condo/Apartment
Attachemnt 1
32 Candy Cane Lane Award
Harris Family & Neighbors - 7964 Gunshot Ct.

Best neighborhood, three or more houses
Attachemnt 1
33 CITY OF DUBLIN
2022 Holiday Home Decorating Contest
Do you have the most festive holiday display in town?
The City of Dublin invites Dublin residents to participate in the City’s Holiday Home Decorating Contest. One winner will be chosen from each of the following categories:
• Seen from Space – best use of lights and color
• Winter Wonderland – best use of music, movement, and technology • Gingerbread House – best use of homemade decorations
• Over Inated – best use of inatables
• Deck the Halls – best apartment/condo/townhome
• Candy Cane Lane – best neighborhood; three or more homes Category winners will receive a special yard sign and a $50 gift certicate from a local business.

Entry forms are available online at www.dublin.ca.gov/holidayhappenings or by request from [email protected].

The deadline to enter is Friday, December 9th at 4:00 p.m. Judging will take place December 12-16, and winners will be announced on December 20. “decK THE HOMES”

IN OUR NEW AMERICAN BACKYARD
Attachment 2
34 2022 “Deck the Homes”
Holiday Home Decorating Contest
January 10, 2023
City Council Meeting – Item 3.3
35 Deck the Homes
• 5
th Year for Residential Home Decorating Contest
• Judges - Commissioners from the Parks &
Community Services Commission.
• Winners selected at the December 19, 2022, Parks
& Community Services Commission meeting.
• Award winners received yard signs, Certificates of
Recognition and a gift card to a local business.
36 Deck the Homes
• 15 Individual Homes.
• 25 Category Entries.
• 2022 Categories:

1. Seen From Space – Best Use of Lights and Color

2. Winter Wonderland Award – Best Use of Music, Movement, & Technology

3. Gingerbread House Award – Best Use of Homemade Decorations

4. Over Inflated Award – Best Use of Inflatables

5. Deck the Halls Award – Best Condo/Apartment

6. Candy Cane Lane Award – Best Neighborhood (Three or More Homes) 37 Deck the Homes Map
38 Contest Winners
39 Seen From Space Award
Bonato Family – 7574 Sutton Ln.

Best Use of Lights and Color 40
Winter Wonderland Award
Brandt Family – 7287 Bedford Way.

Best Use of Music, Movement & Technology 41
Gingerbread House Award
Pena-Gasper Family - 11913 Bloomington Way
Best Use of Homemade Decorations 42
Over Inflated Award
Valdez Family – 11319 Champagne Pl.

Best Use of Inflatables 43
Deck the Halls Award
Dhot Family – 3654 AvainoWay
Best Condo/Apartment 44
Candy Cane Lane Award
Harris Family & Neighbors - 7964 Gunshot Ct.

Best Neighborhood (Three or More Homes) 45
Thank You
46 STAFF REPORT

CITY COUNCIL

Page 1 of 1 ends

Agenda Item 3.4
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Employee Introductions
Prepared by: Sarah Monnastes, Human Resources Director
EXECUTIVE SUMMARY:

New City of Dublin Staff members, Gabrielle Abdon, Associate Civil Engineer, with the Public Works Department, and Gary Gosal, Captain, with Dublin Police Services, will be introduced.

STAFF RECOMMENDATION:

Welcome the new City of Dublin Staff members.

FINANCIAL IMPACT:

None.

DESCRIPTION:

New City of Dublin Staff members, Gabrielle Abdon, Associate Civil Engineer, with the Public Works Department, and Gary Gosal, Captain, with Dublin Police Services will be introduced.

STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted.

ATTACHMENTS:

None.
47 STAFF REPORT

CITY COUNCIL

Page 1 of 1 ends

Agenda Item 4.1
EXECUTIVE SUMMARY:

The City Council will consider approval of the minutes of the December 20, 2022 Regular City Council Meeting.

STAFF RECOMMENDATION:

Approve the minutes of the December 20, 2022 Regular City Council Meeting.

FINANCIAL IMPACT:

None.

DESCRIPTION:

The City Council will consider approval of the minutes of the December 20, 2022 Regular City Council Meeting.

STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted.

ATTACHMENTS:
1) December 20, 2022 Regular City Council Meeting Minutes DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Approval of the December 20, 2022 Regular City Council Meeting Minutes Prepared by: Marsha Moore, MMC, City Clerk
48 MINUTES OF THE CITY COUNCIL

OF THE CITY OF DUBLIN
Regular Meeting: December 20, 2022

DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022
The following are minutes of the actions taken by the City of Dublin City Council. A full video recording of the meeting with the agenda items indexed and time stamped is available on the City’s website at: https://dublin.ca.gov/ccmeetings REGULAR MEETING 7:00 PM
A Regular Meeting of the Dublin City Council was held on Tuesday, December 20, 2022, in the City Council Chamber. The meeting was called to order at 7:06 PM, by Mayor Hernandez. 1) CALL TO ORDER
Attendee Name Status
Melissa Hernandez, Mayor Present
Jean Josey, Vice Mayor Present
Shawn Kumagai, Councilmember Present
Michael McCorriston, Councilmember Present
Dr. Sherry Hu, Councilmember Present
2) PLEDGE OF ALLEGIANCE
3) ORAL COMMUNICATIONS

3.1) Employee Introduction
New City of Dublin Staff member, Skyler Donn Schifano, Senior Office Assistant with the Public Works Department, was introduced.

3.2) Presentation from Caltrans regarding the project along I-680 in Alameda and Contra Costa Counties
The City Council received a presentation from Jack Siauw with Caltrans about the Caltrans Bay Area (District 4) I-680 Pavement Rehabilitation Project in Alameda and Contra Costa Counties which began in December.
49 DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022

3.3) Recognition of Outgoing Alameda County District Attorney Nancy O’Malley The City Council presented a commendation to outgoing Alameda County District Attorney Nancy O’Malley, in appreciation of her dedicated service to the County of Alameda and City of Dublin.

3.4) Recognition of Outgoing Alameda County Sheriff Gregory Ahern The City Council presented a commendation to outgoing Alameda County Sheriff Gregory Ahern, in appreciation of his dedicated service to the County of Alameda and City of Dublin.

3.5) Public Comment
Shawn Costello provided public comment.

Brent Songey provided public comment.

Pavani Vankayala provided public comment.
4) CONSENT CALENDAR

4.1) Approved the December 6, 2022 Regular City Council Meeting Minutes.

4.2) Adopted Resolution No. 145-22 titled, “Accepting the Annual Street Resurfacing Project (2021 Slurry Seal), CIP No. ST0117.”

4.3) Adopted Resolution No. 146-22 titled, “Approving an Agreement with East Bay Pool Service for Pool Maintenance Services.”

4.4) Received the report of payments issued from November 1, 2022 - November 30, 2022, totaling $10,620,676.06.

4.5) Adopted Resolution No. 147-22 titled, “Amending the Benefit Plan.”

4.6) Approved the 2023 City Council Meeting Calendar.

4.7) Received a report on the Annual Comprehensive Financial Report (ACFR) and Annual Audit for Fiscal Year Ending June 30, 2022, and Supplemental Reports Completed by the City’s Independent Auditors.

4.8) Adopted Resolution No. 148-22 titled, “Finding That There is a Proclaimed State of Emergency; Finding that Meeting in Person Would Present Imminent Risks to the Health or Safety of Attendees as a Result of the State of Emergency; and Authorizing Remote Teleconferenced Meetings of the Legislative Bodies of the City of Dublin Pursuant to AB 361.”
50 DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022

4.9) Adopted Resolution No. 149-22 titled, “Delegating Authority to the City Manager to Purchase Police Vehicles Exceeding $45,000 For Fiscal Year 2022-23.” On a motion by Councilmember Kumagai, seconded by Councilmember McCorriston, and by unanimous vote, the City Council adopted the Consent Calendar.

RESULT: ADOPTED [UNANIMOUS]
MOVED BY: Shawn Kumagai, Councilmember
SECOND: Michael McCorriston, Councilmember
AYES: Hernandez, Josey, Kumagai, McCorriston, Hu
5) WRITTEN COMMUNICATION – None.
6) PUBLIC HEARING – None.
7) UNFINISHED BUSINESS – None.
8) NEW BUSINESS

8.1) Certification of November 8, 2022 Election Results The City Council received a presentation on the November 8, 2022 election results for the Office of Mayor and two City Councilmembers from the Alameda County Registrar of Voters.

On a motion by Councilmember Kumagai, seconded by Councilmember McCorriston, and by unanimous vote, the City Council adopted Resolution No. 150-22 titled, “Reciting the Facts of the General Municipal Election Held on November 8, 2022, Declaring the Results Thereof, and Other Such Matters as are Provided by Law.”
RESULT: ADOPTED [UNANIMOUS]
MOVED BY: Shawn Kumagai, Councilmember
SECOND: Michael McCorriston, Councilmember
AYES: Hernandez, Josey, Kumagai, McCorriston, Hu

8.2) Presentation to Outgoing Councilmember Shawn Kumagai The City made a presentation to outgoing Councilmember Shawn Kumagai, in appreciation of his dedicated service to the City.

Councilmember Kumagai received recognition from Congressman Eric Swalwell, State Senator Steve Glazer, Assemblymember Rebecca Bauer-Kahan, and Parks Reserves Forces Training Area.
51 DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022
Inge Houston provided public comment.

Shawn Costello provided public comment.

Mayor Hernandez called for a five-minute recess at 8:26 p.m.

Mayor Hernandez reconvened the meeting at 8:32 p.m.

8.3) Administration of Oath of Office to Councilmembers-Elect Jean Josey and Kashef Qaadri and Mayor-Elect Melissa Hernandez
The Oath of Office was administered to Councilmembers-elect Jean Josey and Kashef Qaadri and Mayor-elect Melissa Hernandez.

8.4) Selection of Vice Mayor
The City Council’s policy is to select, in December of each year, a member of the City Council to serve as Vice Mayor for a period of one year. In the absence of the Mayor, the Vice Mayor would become Mayor Pro Tempore and would assume the temporary responsibilities of the Mayor.

Mayor Hernandez nominated Councilmember Michael McCorriston as Vice Mayor.

Vice Mayor Josey nominated Councilmember Sherry Hu as Vice Mayor.

On a motion by Mayor Hernandez, and by unanimous vote, Councilmember McCorriston was appointed to serve as Vice Mayor for a one-year period from December 2022 – December 2023.

RESULT: APPOINTED [UNANIMOUS]
NOMINATED BY: Melissa Hernandez, Mayor
AYES: Hernandez, McCorriston, Josey, Hu, Qaadri

8.5) Mayor’s Appointment to City Commissions and Committees Mayor Hernandez recommended the following appointments:

Planning Commission
The re-appointment of Janine Thalblum and Catheryn Grier, each to four-year terms which expire in December 2026; the appointment of Matthew Aini to the unscheduled vacancy with a two-year term which expires in December 2024; and the appointment of alternates Wahida Rashid (Alternate 1) and Nicholas Ochoa (Alternate 2), each to two-year terms which expire in December 2024.
52 DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022
Heritage and Cultural Arts Commission
The re-appointment of Gina Gabriell and the appointment of Timea Iharosi and Kim Hudson, each to four-year terms which expire in December 2026; A Kelly Paschal-Hunter to the unscheduled vacancy with a two-year term which expires in December 2024; and the appointment of alternate Darren Phillips to a two-year term which expires in December 2024.

Human Services Commission
The appointment of Rose Hunt and Baljeet Sangha, each to four-year terms which expire in December 2026; and the appointment of alternate Mariam Noorzad (Alternate 1) and Siyu Henningsen (Alternate 2), each to two-year terms which expire in December 2024, Parks and Community Services Commission
The re-appointment of Sameer Hakim and Joe Washington and the appointment of Richard Thornbury, each to four-year terms which expire in December 2026; and the appointment of alternates Daniel Colley (Alternate 1) and Laura Gan (Alternate 2), each to two-year terms which expire in December 2024.

Senior Center Advisory Committee
The re-appointment of Christy Li and Kebin Lu and the appointment of Loc Valencia, each to four-year terms which expire in December 2026; and the appointment of alternates Shweta Bhatnagar (Alternate 1) and Candy Velasco (Alternate 2), each to two-year terms which expire in December 2024.

On a motion by Councilmember Josey, seconded by Councilmember Qaadri, and by unanimous vote, the City Council confirmed the Mayor’s appointments to the various commissions and committees.

RESULT: ADOPTED [UNANIMOUS]
MOVED BY: Jean Josey, Councilmember
SECOND: Kashef Qaadri, Councilmember
AYES: Hernandez, McCorriston, Josey, Hu, Qaadri
53 DUBLIN CITY COUNCIL MINUTES

REGULAR MEETING
December 20, 2022

8.6) City Council Committee Appointments and Assignments The City Council discussed the Mayor’s proposed appointments and the Mayor added Councilmember Josey as the alternate to the East Bay Division of the League of California Cities, switched Vice Mayor McCorriston’s and Councilmember Qaadri’s positions on the TriValley Affordable Housing Committee, replaced Councilmember Josey with Councilmember Qaadri as the member on the ABAG General Assembly, and replaced Councilmember Josey with Councilmember Hu as the member on the Alameda County Fire Department Advisory Committee.

On a motion by Vice Mayor McCorriston, seconded by Councilmember Hu, and by unanimous vote, the City Council adopted Resolution No. 151-22 titled, “Confirming the Mayor’s Appointments to Various Local and Regional Boards, Committees, and Commissions,” as amended and directed Staff to notify affected agencies, as appropriate.

RESULT: ADOPTED [UNANIMOUS]
MOVED BY: Michael McCorriston, Vice Mayor
SECOND: Dr. Sherry Hu, Councilmember
AYES: Hernandez, McCorriston, Josey, Hu, Qaadri
9) OTHER BUSINESS – None.
10) ADJOURNMENT
Mayor Hernandez adjourned the meeting at 9:16 p.m.

Mayor
ATTEST:

City Clerk
54 STAFF REPORT

CITY COUNCIL

Page 1 of 3 ends

Agenda Item 4.2
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Youth Mini-Grant Funding Recommendations Approval Prepared by: Liz Elliott, Recreation Supervisor
EXECUTIVE SUMMARY:

The City Council will consider approving the Youth Advisory Committee Mini-Grant Program recommended funding allocations.

STAFF RECOMMENDATION:

Adopt the Resolution Approving Funding Recommendations for Fiscal Year 2022-23 for the Youth Advisory Committee Mini-Grant Program.

FINANCIAL IMPACT:

The Youth Mini-Grant Program is supported by the General Fund in the amount of $2,500 for Fiscal Year 2022-23.

DESCRIPTION:

The City established the Mini-Grant Program in Fiscal Year 2012-13 to support youth organizations that offer programs for middle and high school students other than those offered by the Parks and Community Services Department. Each year, Dublin-based youth organizations/clubs have an opportunity to apply for grant funding to assist them in offering activities to the community, including performing arts, sports, multicultural awareness, health awareness, or other activities that support projects or programs benefiting Dublin youth. Funding is recommended annually by the Youth Advisory Committee (YAC) and awarded by the City Council to organizations/clubs that best meet the needs of Dublin youth.

At a Special Meeting on March 5, 2020, the City Council opted to increase funding for the Youth Mini-Grant program from $1,600 to $2,500. The increase in funding was incorporated into the Fiscal Year 2020-21 and future year operating budgets.

The Youth Mini-Grant application was placed online Monday, October 3, 2022, with a submittal deadline of November 3, 2022. The program was advertised via social media, the City’s website, at 55

Page 2 of 3 ends

Dublin high and middle schools, and was sent to the YAC to assist with publicity.

At its Special Meeting on November 16, 2022, the YAC received presentations and used a criteria form (Attachment 2) to review, rate, and develop funding recommendations for each of the following applicants:

1. DubMed

2. Gardeners of the Galaxy

3. SHAPE (Student Health Advocates for a Positive Environment)

4. Teens Unite for Education
After the presentations, YAC members deliberated and further discussed the applicants, specifically Gardeners of the Galaxy and Student Health Advocates for a Positive Environment (SHAPE).

Gardeners of the Galaxy provides microgreens to the Dublin High School student lunch program that serves over 3,000 students daily. Over the past three years, the organization has doubled the amount of Dublin youth served with the help of funding from the Youth Mini-Grant Program. The Commitee discussed the proposal and awarded the full requested amount.

SHAPE focuses on improving and supporting students' overall health at Dublin High School. Their specific goal is to provide sunscreen dispensers and sunscreen for students to utilize when visiting the Sports Complex. During their oral presentation SHAPE requested an added $100 above the amount initially requested. After reviewing programming aspects, they found that the sunscreen bottles will require wall mounts, costing more for installation. The Committee discussed the idea and decided to recommend SHAPE receive an added $100. The organization serves 200 Dublin High School student-athletes.

After the presentations, YAC members deliberated and recommended funding amounts for each of the four organizations as follows:

TABLE 1: RECOMMENDED FUNDING AMOUNTS
Organization
Grant
Requested
FY 22-23 Grant Proposal
YAC Funding
Recommendation
YAC Points
Average
DubMed $500
Print copies of
medical articles
written by students
$200 9.3
Gardeners of the
Galaxy $1,500
Purchase trays, soil,
seeds to grow
Microgreens
$1,500 13.6
SHAPE (Student
Health Advocates for a
Positive Environment)
$350
Purchase sunscreen
for student-athletes
to put in sports
complex at Dublin
High School
$450 12.9
Teens Unite for
Education $500 Purchase backpacks and $350 11.2
56

Page 3 of 3 ends

school supplies to
provide to underprivileged
preschoolers
Totals $2,850 $2,500
Upon completion of their projects, grant recipients will have two weeks to complete a brief project report on how funds were used and the number of youths impacted. Grantees are encouraged to supply photos, testimonials, and flyers used to promote their projects. Those who do not submit a report in a timely fashion may not be considered for future Youth Mini-Grants.

At its December 19, 2022, meeting, the Parks and Community Services Commission confirmed the selections made by the YAC and recommended the funding allocations to the City Council.

STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

The City Council Agenda was posted, and a copy of this Staff Report was sent to the applicants.

ATTACHMENTS:
1) Resolution Approving Funding Recommendations for Fiscal Year 2022-23 Youth Advisory Committee Mini-Grant Program
2) YAC Mini-Grant Rating Form
3) Fiscal Year 2022-23 Mini-Grant Applications and Proposals 57 Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 1 of 2 Attachment 1
RESOLUTION NO. XX – 23

APPROVING FUNDING RECOMMENDATIONS FOR
FISCAL YEAR 2022-23 YOUTH ADVISORY COMMITTEE MINI-GRANT PROGRAM WHEREAS, the City received four applications for the Fiscal Year 2022-23 Youth Advisory Committee Mini-Grant Program; and
WHEREAS, the total amount of funding requested exceeds funding availability; and WHEREAS, funding for the Mini-Grant Program is provided for in the adopted City of Dublin General Fund Budget; and
WHEREAS, on November 16, 2022, the Youth Advisory Committee recommended four youth organizations/clubs to receive grant funding through the Mini-Grant Program; and WHEREAS, on December 19, 2022, the Parks and Community Services Commission reviewed the Youth Advisory Committee’s funding allocations to four youth organizations/clubs; and
WHEREAS, the Parks and Community Services Commission has provided the City Council with funding recommendations for the Fiscal Year 2022-23 Mini-Grant Program.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the Youth Advisory Committee Mini-Grant Program funding allocation for Fiscal Year 2022-23 as follows:

ORGANIZATION/ CLUB NAME

CITY COUNCIL

APPROVED FUNDING
DubMed $200
Gardeners of the Galaxy $1,500
SHAPE (Student Health Advocates for a Positive
Environment) $450
Teens Unite for Education $350
Total Recommended Amount $2,500
58 Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 2 of 2 PASSED, APPROVED AND ADOPTED this 10th day of January 2023 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Mayor
ATTEST:

City Clerk
59 City of Dublin
Youth Advisory Committee
Mini Grant Rating Form
Attachment 2
Organization: ______________________________ Program: _______________________________

PROPOSAL SCORE
Maximum of 15 points
RECOMMEND FUNDING Yes No 
Total Requested Total Recommended
RECOMMENDING FUNDING FOR THE FOLLOWING YOUTH ACTIVITIES: (CHECK ONE). SCHOOL CLUB SPORT ORGANIZATION PERFORMING ARTS CULTURAL AWARENESS HEALTH AWARENESS OTHER YOUTH ACTIVITY/ORGANIZATION___________________ THE WORD “PROGRAM” IS USED BELOW ON THIS FORM TO INCLUDE SERVICES, ACTIVITIES OR IMPROVEMENTS.

1. Organization/Management
 Youth benefitting from or involved with the project must include 75% Dublin residents who are of middle school or high school age.
 The youth organization/group, as presented in the application, is able to achieve the stated goals and outcomes.  The youth organization/group has completed all required aspects of the application process.  The youth organization/group has an adult sponsor that assists in the management or oversight of the organization/group.
(Maximum of 5) ______

2. Needs/Benefit
 The recipients are the appropriate target group (75% Dublin youth).  The applicant provides an activity to Dublin residents that other organizations do not provide.  Applicant’s proposed activity supports projects and programs serving or benefitting Dublin youth.  The applicant collaborates with other youth-oriented organizations. (Maximum of 5) ______

3. Funding/ Budget
 The youth organization/group described in detail what the funds will be used for.  The youth organization/group described how they will provide verification to the YAC that the funds were used as proposed.
(Maximum of 5) ______
60 Youth Advisory Committee - Youth Mini Grant Request for Proposals General Information:

A. Qualifications:

1. Youth benefiting from or involved with the project must include at least 75% Dublin residents who are of middle or high school age.

2. Organization/Club must have an adult sponsor.

3. Organization/Club must be based within the City of Dublin.

B. Proposal:

The proposal must be no longer than two-and-a-half pages, double-spaced. The proposal should include the following:

1. A brief description of your organization.

2. Describe the project and how it will benefit Dublin youth.

3. Describe what and how the funds/grant will be used.

4. Explain what proof will be given to the Youth Advisory Committee that funds were used as proposed.

5. Should a grant have been awarded in the past to the same organization, a brief review of how the money was spent and how it benefitted the group needs to be highlighted in this year's presentation.

C. Submission:

The application and proposal will be accepted beginning Monday, October 3, 2022 at 8:00 AM., through Thursday, November 3, 2022 at 11:59 PM. *Please note: Early applications are encouraged. Applications will be disqualified if not received by the deadline and/or the qualifications/proposal do not meet the criteria.

Two ways to submit an application and proposal:

1. Email application packet to: Liz Elliott

2. Submit the application packet in-person at the Shannon Community Center; Attention: Liz Elliott, 11600 Shannon Avenue, Dublin, CA 94568.

Print
City of Dublin Youth Advisory Committee - 2022 Youth Mini Grant Application - Submission #5371
Date Submitted: 10/28/2022
Attachment 3
61 D. Presentation (limited to five minutes)
Selected applicants will be notified on Wednesday, November 9, 2022 to present their proposal at the Youth Advisory Committee Special Meeting on Wednesday, November 16, 2022, at 7:00 p.m. at The Dublin Senior Center. A youth member or members, along with the adult sponsor of the organization or club, must conduct the presentation.

Name of Organization/Club:*
DubMed
Address1*
City*
Dublin
State*
CA
Zip*
94568
Phone:*
Primary Contact Person (Name & Title):*
Claire Song; Co Editor-in-Chief
Phone:* Email:*
Adult Sponsor (Name & Title):*
Anne Ha; Dublin High School Teacher
Phone: * Email:*
Amount Requesting:*
$500
Number of People in
Organization:*
28 Percent of Dublin Youth Participants:*
100%
Did the Youth Organization/Club receive grant funding in the past?*
Yes
No
62 If yes, please explain howthe funding from the Youth Mini Grants was used; if the goals were met; and the impact on the program.

I have reviewed the proposal, and to the best of my knowledge, the funds requested from the City of Dublin will be used to provide the services described in this Request for Proposal. I also attest that the above-named organization/club have not received a grant from the City of Dublin within the past year.

Adult Sponsor's Acknowledgement *
Anne Ha
Date: *
10/28/2022
63 DubMed 2022 Youth Mini Grant Request
A brief description of your organization.

DubMed is a medical magazine founded by students at Dublin High school who want to tackle the issue of accessibility in STEM. In scientific literature today, the concepts and vocabulary used to describe these topics make it extremely difficult for the general public to understand. Our mission is to create magazines targeting interesting health topics and discoveries that will be both more comprehensible and accessible to accommodate a more diverse group of people. We believe that health education should be open to people regardless of their educational background, because advancement is not made through the intelligence of solely one individual but begins through the contribution of a whole community. We have already developed 2 full editions, which were presented at HOSA’s (Future Health Professionals) Health Education event, and placed third overall in the California state.

Describe the project and how it will benefit Dublin youth.

There are many exciting discoveries and research within the health or science fields, yet due to its limited accessibility, many are unaware of these topics. Ultimately, our goal is to create both an informative and comprehensible medical magazine that will allow for high school students to be acquainted with ongoing medical issues as well as novel research. The more knowledgeable our community is about health issues, the more we can improve the quality of life on a day to day basis. Students will also be encouraged to join the effort, with opportunities to spread their health knowledge in the magazine. We also hope to get rid of the notion that you must use difficult vocabulary or grammar in order to sound professional. No matter how “informal” the 64 language, if it is able to create change and impact the audience, it is still an influential piece of writing that should be acknowledged.

Every month, we focus on a different topic that targets a different subject; for example, one of our editions last year focused on mental health. For the month of November this year, we will be focusing on Sports Health. Many Dublin youths participate in a sport, and it is important to emphasize the health risks related with playing these sports. Not only does our magazine provide a platform for students interested in STEM to write, but it also directly tackles issues that are most important to teenagers today.

Describe what and how the funds/grant will be used.

The funds will be used to print the magazines themselves, so that physical copies of the magazine can be distributed. Using the supplier MGX Print, around 100 copies will result in ~$180, around $1.80 per magazine. This number may slightly shift depending on the number of pages within the magazine when it is in its finalized stages. We are planning on developing 3 editions this school year, and the number of magazines printed will be around 100 for each edition. Any leftover funds will be saved for the next edition, or for the next school year. We are requesting a total of $500 to begin printing 2 editions this school year.

Explain what proof will be given to the Youth Advisory Committee that funds were used as proposed.

A receipt of the transaction will be provided to the Youth Advisory Committee, as well as a copy of the physical magazine to prove the funds were used as proposed. 65 Youth Advisory Committee - Youth Mini Grant Request for Proposals General Information:

A. Qualifications:

1. Youth benefiting from or involved with the project must include at least 75% Dublin residents who are of middle or high school age.

2. Organization/Club must have an adult sponsor.

3. Organization/Club must be based within the City of Dublin.

B. Proposal:

The proposal must be no longer than two-and-a-half pages, double-spaced. The proposal should include the following:

1. A brief description of your organization.

2. Describe the project and how it will benefit Dublin youth.

3. Describe what and how the funds/grant will be used.

4. Explain what proof will be given to the Youth Advisory Committee that funds were used as proposed.

5. Should a grant have been awarded in the past to the same organization, a brief review of how the money was spent and how it benefitted the group needs to be highlighted in this year's presentation.

C. Submission:

The application and proposal will be accepted beginning Monday, October 3, 2022 at 8:00 AM., through Thursday, November 3, 2022 at 11:59 PM. *Please note: Early applications are encouraged. Applications will be disqualified if not received by the deadline and/or the qualifications/proposal do not meet the criteria.

Two ways to submit an application and proposal:

1. Email application packet to: Liz Elliott

2. Submit the application packet in-person at the Shannon Community Center; Attention: Liz Elliott, 11600 Shannon Avenue, Dublin, CA 94568.

Print
City of Dublin Youth Advisory Committee - 2022 Youth Mini Grant Application - Submission #5377
Date Submitted: 11/2/2022
66 D. Presentation (limited to five minutes)
Selected applicants will be notified on Wednesday, November 9, 2022 to present their proposal at the Youth Advisory Committee Special Meeting on Wednesday, November 16, 2022, at 7:00 p.m. at The Dublin Senior Center. A youth member or members, along with the adult sponsor of the organization or club, must conduct the presentation.

Name of Organization/Club:*
Gardeners of the Galaxy
Address1*
City*
Dublin
State*
California
Zip*
94568
Phone:*
Primary Contact Person (Name & Title):*
Arjun Karur-Parekh
Phone:* Email:*
Adult Sponsor (Name & Title):*
Frank Castro, Child Nutrition DIrector, DUSD
Phone: * Email:*
Amount Requesting:*
1500
Number of People in
Organization:*
5 Percent of Dublin Youth Participants:*
100%
Did the Youth Organization/Club receive grant funding in the past?*
Yes
No
67 If yes, please explain howthe funding from the Youth Mini Grants was used; if the goals were met; and the impact on the program.

We were proud to receive our first grant of $480 from the City of Dublin in 2020. We used those funds to donate over 85 trays (30 pounds) of sunflower microgreens and gave away over 500 sunflower seedlings during the food drive for people to grow in their backyards. 950 families in DUSD were fed chicken and vegetarian wraps made using our salad greens. We were awarded a $700 grant for the year 2021–2022, and in less than three months of operation, we were able to grow and distribute 115 trays (45 pounds of microgreens!). Over 3000 diets have been supplemented with this since early 2021.

I have reviewed the proposal, and to the best of my knowledge, the funds requested from the City of Dublin will be used to provide the services described in this Request for Proposal. I also attest that the above-named organization/club have not received a grant from the City of Dublin within the past year.

Adult Sponsor's Acknowledgement *
Frank Castro
Date: *
11/02/2022
68 >
Dear Ms. Elliot and fellow YAC members,
I am emailing again as the previous email was sent by accident before the grant proposal was finalized. I hope you can disregard my first email and please consider the following. Thank you.

It is with much delight that I am reapplying for the youth grant for 2023.

My name is Arjun Karur-Parekh and I am a junior at Dublin High School. Since I began gardening in the fifth grade, I have founded a group called the "Gardeners of the Galaxy." Our goal is to cultivate and contribute healthy food options to the students of Dublin Unified School District, Tri-Valley Food Pantry, and anyone else in need. Food that is fresh, healthful, and reasonably priced is always needed. Our group had the pleasure of meeting that need by giving over 100 trays of pea microgreens to the DUSD during the previous academic year with the aid of the youth grant we received. With students back in school, the need for fresh affordable options is even higher this year and our group hopes to continue our efforts with the aid of another grant.

Growing microgreens will be the main emphasis of our group. It will consist of 3-5 who will grow the greens and deliver them to the DUSD school kitchens, as well as to Fertile Groundworks, a non-profit church organization that has volunteered to be our distributor to local food pantries. Adding microgreens to the menu will enhance the nutritional value because the nutrition density is up to 6 times greater than mature leafy greens. Our goal is to grow 5-10 pounds of microgreens a week. To meet all the safety standards, we have obtained a community producer license from the Alameda County of Environmental Services. In addition, Mr. Frank Castro, the director of nutritional services is our sponsor from the school district and has been an excellent supporter.

Funding is essential for this project's continuation since it will be necessary to purchase trays, soil, and seeds. Growing one tray costs 69 roughly $6.10 and can yield up to 16 servings! By collaborating with local businesses, we hope to reduce the cost even further by bulk purchasing.

At specific checkpoints, photos will be taken to document how the money was utilized, and correct bookkeeping, i.e. Every harvest is weighed, photos taken at delivery, reliable databases, and there are treasury logs. To draw even more attention to our organization, a website with all project-related information will also be made.

We were proud to receive our first grant of $480 from the City of Dublin in 2020. We used those funds to donate over 85 trays (30 lbs) of sunflower microgreens and gave away over 500 sunflower seedlings during the food drive for people to grow in their backyards! 950 families in DUSD were fed chicken and vegetarian wraps made using our salad greens. We were awarded a $700 grant for the year 2021–2022, and in less than three months of operation, we were able to grow and distribute 115 trays (45 pounds of microgreens!). Over 3000 diets have been supplemented with this since early 2021. We will be starting our growing earlier this year and hope to get at least 5 months of growth in. This would help to nearly double the amount of meals enhanced.

We genuinely wish to keep working hard. Securing the YAC’s support will help with the expansion and reach of our club. All of us have been affected by the Covid-19 epidemic, but with innovative ideas and teamwork, we firmly think we can have a profound influence on our neighborhood.

Thank you again for supporting us and we look forward to hearing back from you.

Regards,
Arjun Karur-Parekh
:

Dear Ms. Elliot
It is with much delight that I am reapplying for the youth grant for 2023.

My name is Arjun Karur-Parekh and I am a junior at Dublin High school. I have been gardening since I was in 5th grade and have started an organization called the“Gardeners of the Galaxy ''. Our goal is to grow and donate healthy food options to the students of Dublin 70 Unified School District, Tri-Valley Food Pantry, and anyone else in need. By all means the COVID-19 pandemic is not continues to evolve, the need for fresh, healthy, affordable food remains constant and ever-present. Last school year, with the aid of the youth grant, our club had the pleasure of contributing to that need by donating over 100 trays of pea microgreens to the DUSD. With students back in school, the need for fresh affordable options is even higher this year and our group hopes to continue our efforts with the aid of another grant.

Our club will be primarily focusing on growing microgreens. It will consist of 3-5 who will be growing and delivering them to the DUSD school kitchens, as well as to Fertile Groundworks, a non-profit church organization that has volunteered to be our distributor to food pantries. Adding microgreens to the menu will enhance the nutritional value because the nutrition density is up to 6 times greater than mature leafy greens. Our goal is to grow 5-10 pounds of microgreens a week. To meet all the safety standards, we have obtained a community producer license from the Alameda County of
Environmental Services. In addition Mr. Frank Castro, the director of nutritional services is our sponsor from the school district and has been an excellent supporter.

If we wish to sustain this project, funding is crucial and will be used to buy trays, soil, and seeds. The cost of growing 1 tray is about $6.10 which can yield up to 16 servings! By collaborating with local businesses, we hope to reduce the cost even further by bulk purchasing.

To prove that the funds are used as proposed, pictures will be taken at certain milestones and accurate bookkeeping will be initiated, ie. pictures taken at each delivery, weighing of product every harvest, accurate databases, and treasury logs. Additionally, a website with all information regarding the project will be created to get additional attention to our group.

We were proud to receive our first grant of $480 from the City of Dublin in 2020. We used those funds to donate over 85 trays of microgreens and gave away over 500 sunflower seedlings during the food drive for people to grow in their backyards! Those salad greens were used to enhance the nutritional value of chicken and vegetarian wraps which fed more than 950 families throughout DUSD! For the 2021/22 grant, we received $700 and with that, we were able to grow and donate 115 trays and almost 45 pounds in less than 3 months of operation. With this, we helped supplement over 2000 diets and about 3000 diets since early 2021. We will be starting our growing earlier this year and hope to get at least 5 months of growing in and this would help to nearly double the amount of meals enhanced. 71 We sincerely hope to continue our efforts and secure your support with this grant, so we can grow and support those in need.

The Covid-19 pandemic has taken a toll on all of us and with creative ideas and working together, we truly believe we can make a huge impact on our community.

Thank you again for supporting us and we look forward to hearing back from you.

Regards,
Arjun
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
72 Youth Advisory Committee - Youth Mini Grant Request for Proposals General Information:

A. Qualifications:

1. Youth benefiting from or involved with the project must include at least 75% Dublin residents who are of middle or high school age.

2. Organization/Club must have an adult sponsor.

3. Organization/Club must be based within the City of Dublin.

B. Proposal:

The proposal must be no longer than two-and-a-half pages, double-spaced. The proposal should include the following:

1. A brief description of your organization.

2. Describe the project and how it will benefit Dublin youth.

3. Describe what and how the funds/grant will be used.

4. Explain what proof will be given to the Youth Advisory Committee that funds were used as proposed.

5. Should a grant have been awarded in the past to the same organization, a brief review of how the money was spent and how it benefitted the group needs to be highlighted in this year's presentation.

C. Submission:

The application and proposal will be accepted beginning Monday, October 3, 2022 at 8:00 AM., through Thursday, November 3, 2022 at 11:59 PM. *Please note: Early applications are encouraged. Applications will be disqualified if not received by the deadline and/or the qualifications/proposal do not meet the criteria.

Two ways to submit an application and proposal:

1. Email application packet to: Liz Elliott

2. Submit the application packet in-person at the Shannon Community Center; Attention: Liz Elliott, 11600 Shannon Avenue, Dublin, CA 94568.

Print
City of Dublin Youth Advisory Committee - 2022 Youth Mini Grant Application - Submission #5378
Date Submitted: 11/2/2022
73 D. Presentation (limited to five minutes)
Selected applicants will be notified on Wednesday, November 9, 2022 to present their proposal at the Youth Advisory Committee Special Meeting on Wednesday, November 16, 2022, at 7:00 p.m. at The Dublin Senior Center. A youth member or members, along with the adult sponsor of the organization or club, must conduct the presentation.

Name of Organization/Club:*
SHAPE (Student Health Advocates for a Positive Environment) Address1*
City*
Dublin
State*
California
Zip*
94568
Phone:*
Primary Contact Person (Name & Title):*
Ms. Laasya Balupari
Phone:* Email:*
Adult Sponsor (Name & Title):*
Ms. Eleana Brumage
Phone: * Email:*
Amount Requesting:*
$350
Number of People in
Organization:*
32 Percent of Dublin Youth Participants:*
100%
Did the Youth Organization/Club receive grant funding in the past?*
Yes
No
74 If yes, please explain howthe funding from the Youth Mini Grants was used; if the goals were met; and the impact on the program.

I have reviewed the proposal, and to the best of my knowledge, the funds requested from the City of Dublin will be used to provide the services described in this Request for Proposal. I also attest that the above-named organization/club have not received a grant from the City of Dublin within the past year.

Adult Sponsor's Acknowledgement *
Eleana Brumage
Date: *
11/2/2022
75 Dear Dublin Youth Advisory Committee and the City of Dublin, We are SHAPE (Student Health Advocates for a Positive Environment), a club at Dublin High School centered around community health and helping others live a healthier lifestyle.

SHAPE was founded by two Dublin student athletes who realized that their needs and the needs of several other students were not being met. The catalyst? Seeing dozens of kids spending hours in the sun without sunscreen. Considering that skin cancer is the most common cancer in the US, sunscreen is a basic necessity to half one’s risk of cancer and melanoma. We decided that we wanted to tackle this issue, and other ones such as menstrual disorders, homelessness, and water quality.

Our objective is to improve and support the health of all students on campus, as well as the community. Through the many projects we will complete, members will learn about the different issues students experience on campus. Projects will provide and implement solutions on campus, aiding hundreds students by giving them important resources and promoting healthier habits schoolwide, leading to a healthier student body.

We are incredibly focused on finding ways to make a loud, direct impact on our community. Our first project, funding sunscreen dispensers for our Sports Complex, will be positively impacting hundreds of different athletes: from soccer players, cross country runners, and sprinters, to tennis players, golfers, and swimmers. Simultaneously, we are also working on arranging guest speakers to talk about an issue we see present in our community, the Female Athlete Triad, which is a set of health issues common in female athletes that has directly caused several bone problems, mental health struggles, decreased athletic performance, and injuries for our athletes. These, along with scheduled projects to help the homeless this winter, stock 76 bathrooms with menstrual products, and make first aid more accessible, are ways we are impacting the Dublin student body.

We already conducted our first fundraiser by selling Halloween grams for students, but running our solutions requires more funding than we currently have. Although we have raised enough for the installation of sunscreen dispensers in the Sports Complex, funding from this grant will allow us to consistently refill the dispenser for the spring season, giving students and athletes daily access to this resource. Maintenance is estimated to be around $50 dollars a month for three months, serving over 200 student athletes. From there, we will also begin stocking other supplies, such as menstrual products. This winter we are going to run a series of knitting classes, where families all over Dublin can participate in knitting hats and scarves for local homeless shelters. Though the majority of this event will be fueled by volunteers, we have an estimated $50 cost for this workshop. This will require funding to provide participants with the necessary materials for knitting. Finally, we are prototyping water filtration systems throughout campus, making cleaner water available to students. We have noticed that students frequently complain about their poor water quality at school, with many choosing to be dehydrated over drinking the water provided. Since our advisor and school have extra materials that we can use, the cost for this project is around $30. Other workshops and guest speakers are also planning to be run.

As proof of proper handling of funds, SHAPE is dedicated to tracking our earnings, spendings, and other transactions. We keep all this information in our club records, as well as keep receipts of any purchases the club makes. This information will be consistently updated and shared with the Youth Advisory Committee. All files and treasury information is maintained on a Google Drive Folder, which will be shared with the YAC, and pictures of events are posted on 77 our social media. At the end of the year, SHAPE is willing to hold a meeting/presentation with the YAC to discuss the outcomes of the club and the usage of the funds.

Thank you for considering our request, and we hope you support our mission to create a healthier community in Dublin.

Sincerely,
Laasya Balupari and Isha Mittal
Co-Presidents of SHAPE @ Dublin High
78 Youth Advisory Committee - Youth Mini Grant Request for Proposals General Information:

A. Qualifications:

1. Youth benefiting from or involved with the project must include at least 75% Dublin residents who are of middle or high school age.

2. Organization/Club must have an adult sponsor.

3. Organization/Club must be based within the City of Dublin.

B. Proposal:

The proposal must be no longer than two-and-a-half pages, double-spaced. The proposal should include the following:

1. A brief description of your organization.

2. Describe the project and how it will benefit Dublin youth.

3. Describe what and how the funds/grant will be used.

4. Explain what proof will be given to the Youth Advisory Committee that funds were used as proposed.

5. Should a grant have been awarded in the past to the same organization, a brief review of how the money was spent and how it benefitted the group needs to be highlighted in this year's presentation.

C. Submission:

The application and proposal will be accepted beginning Monday, October 3, 2022 at 8:00 AM., through Thursday, November 3, 2022 at 11:59 PM. *Please note: Early applications are encouraged. Applications will be disqualified if not received by the deadline and/or the qualifications/proposal do not meet the criteria.

Two ways to submit an application and proposal:

1. Email application packet to: Liz Elliott

2. Submit the application packet in-person at the Shannon Community Center; Attention: Liz Elliott, 11600 Shannon Avenue, Dublin, CA 94568.

Print
City of Dublin Youth Advisory Committee - 2022 Youth Mini Grant Application - Submission #5373
Date Submitted: 10/30/2022
79 D. Presentation (limited to five minutes)
Selected applicants will be notified on Wednesday, November 9, 2022 to present their proposal at the Youth Advisory Committee Special Meeting on Wednesday, November 16, 2022, at 7:00 p.m. at The Dublin Senior Center. A youth member or members, along with the adult sponsor of the organization or club, must conduct the presentation.

Name of Organization/Club:*
Teens Unite for Education
Address1*
City*
Dublin
State*
Ca
Zip*
94568
Phone:*
Primary Contact Person (Name & Title):*
Saiesha Goel; President
Phone:* Email:*
Adult Sponsor (Name & Title):*
Shamila Yaqub; Advisor
Phone: *
(
Email:*
Amount Requesting:*
$500
Number of People in
Organization:*
30 Percent of Dublin Youth Participants:*
100%
Did the Youth Organization/Club receive grant funding in the past?*
Yes
No
80 If yes, please explain howthe funding from the Youth Mini Grants was used; if the goals were met; and the impact on the program.

Using the funds provided to us from the Youth Mini Grant, we were able to provide 70+ students with backpacks and the materials they need to succeed. This year our goal is to impact at least 90+ students.

I have reviewed the proposal, and to the best of my knowledge, the funds requested from the City of Dublin will be used to provide the services described in this Request for Proposal. I also attest that the above-named organization/club have not received a grant from the City of Dublin within the past year.

Adult Sponsor's Acknowledgement *
Shamaila Yaqub
Date: *
10/30/22
81 Teens Unite For Education Mini Grant Proposal
Dear Youth Advisory Committee Members,
My name is Saiesha Goel and I am the President of Teens Unite For Education at Dublin High School. This club was founded in 2017 by Shaina Goel. The members of our club are students from four grade levels at Dublin High School. The mission of our club is to provide necessary resources to kids in low income families which will allow them to succeed and thrive in their educational journey. This year, our aim is to provide backpacks and school supplies to all students at a local low-income preschool, Kidango. Kidango is located in West Dublin right next to Dublin High School. Many people think that people who live in Dublin are financially well off, but this isn’t always the case. Therefore, we would like to give back to our local community and help those in need. By donating to people who may not be able to afford the necessary supplies for their children, we are supporting our future generation strive towards their desired goals. We plan to donate backpacks, notebooks, writing utensils, erasers, rulers, small non-perishable snacks, etc. In the past years, we have also donated $200+ to a nonprofit organization called Yours Humanly. Yours Humanly has a similar goal as us, they help kids in low-income housing, all over the world, get a chance to receive the gift of education.

Although we hope to receive the grant to ensure that we continue to give back to our local community, we will also continue to fundraise throughout the year. We plan on partnering with teen hotspots like BobaX, T4, Panda Express, Ini Burger, Chipotle, etc. If we are granted the funds we are requesting, we will provide receipts to prove that we are using the money to buy the necessary supplies for the students. We will also include pictures of the dropoff and handing out the backpacks.
82 In the past, our club has graciously been granted donations by the Youth Advisory Mini Grant Committee. Each year, we have spent this money wisely and given children backpacks full of treats and school supplies. One year, we were able to fundraise additional funds which we used towards holding a nutritional class at Kidango. This class helped educate little kids and their families on the importance of nutrition and picking healthier snack options to keep them physically healthy.

Last year we used the grant money to buy backpacks, pencils, folders, pencil pouches, and more. At the end of the year, we delivered the backpacks full of supplies to Kidango, Dublin.

Our donation helped these kids and their families be better prepared for their upcoming school year.

Thank you for your time and consideration,
Saiesha Goel
President of Teens Unite for Education
83 STAFF REPORT

CITY COUNCIL

Page 1 of 3 ends

Agenda Item 4.3
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Approval of Plans and Specifications and Award of Contract to St. Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713
Prepared by: Sai Midididdi, Associate Civil (Traffic) Engineer EXECUTIVE SUMMARY:

The City Council will consider approving the plans and specifications and awarding a construction contract to St. Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713. The project will install a three-inch conduit on Dublin Boulevard between the Civic Center and San Ramon Road. This project is exempt under Section 15302 (Replacement and Reconstruction) of the CEQA Guidelines.

STAFF RECOMMENDATION:

Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to St.

Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713.

FINANCIAL IMPACT:

The bid submitted by St. Francis Electric is $806,000. Since the project involves directional drilling and installation of a conduit under the sidewalk with the potential for utility conflicts, Staff recommends a construction contingency of $160,000 (about 20%) to facilitate change orders for unforeseen construction issues, bringing the total potential construction cost to $966,000.

Sufficient funds are available in the approved budget for CIP No. ST0713. 84

Page 2 of 3 ends

DESCRIPTION:

The 2022-2027 Capital Improvement Program (CIP) includes the Citywide Signal Communications Upgrade, CIP No. ST0713 (Attachment 2), which provides for a variety of upgrades to the City’s signal communications infrastructure. The subject project, Conduit Installation for Future Fiber Interconnect on Dublin Boulevard, is part of the scope of CIP No. ST0713 and will install a threeinch conduit on Dublin Boulevard between the Civic Center and San Ramon Road. In a future phase, a fiber optic interconnect will be installed in the conduit, and all the intersections along Dublin Boulevard between the Civic Center and San Ramon Road will be upgraded to a faster, more reliable, and higher bandwidth network connection.

Bid Process and Results
The City of Dublin issued the bid package for the project on November 14, 2022. The bid package was made up of 10 base bid items. Three sealed bids with the base bid amounts of $806,000, $975,910, and $1,100,300 were received by the deadline of December 13, 2022. The lowest base bid of $806,000 was submitted by St. Francis Electric. A summary of the bids is provided as Attachment 3.

Compliance with Community Workforce Agreement
On January 11, 2022, the City Council approved a Community Workforce Agreement (CWA) with the Building and Construction Trades Council of Alameda County and its Affiliated Local Unions.

The CWA is applicable to public works projects valued at over $1,000,000, ensures that there are no labor issues related to said projects, and bolsters local efforts to connect residents with careers in the building and construction trades. The CWA includes a Local Hire Goal where 20% of all hours on a project be worked by Local Residents, which are defined as individuals that reside within Alameda County or within a 15-mile radius of City limits. The CWA also requires contractors to hire one new apprentice for the first $1,000,000 of construction costs, and an additional new apprentice for every $5,000,000 of construction costs, based on the engineer’s estimate. Apprentices must work a minimum of 10% of the total craft’s work hours, but the CWA allows that apprentices may be deployed to another project to ensure the minimum number of hours are met.

Although the lowest bid is less than $1,000,000, the engineer’s estimate for the project was between $900,000 and $1,000,000, so Staff worked with a consultant, Workforce Integrity and Training Solutions, to prepare bid documents that comply with the provisions of the CWA. The provisions include that responsive bidders and their subcontractors must provide an executed agreement to be bound to and by the CWA within 14 days after notice of award.

Recommendation
Staff reviewed the bid results, checked references and necessary licenses, and recommends that the City Council award the construction contract to St. Francis Electric as the lowest responsive and responsible bidder. St. Francis Electric did include an executed agreement to be bound to the CWA with their bid.

To facilitate the approval of change orders and avoid construction delays, Staff recommends that the City Manager or designee be authorized to approve change orders up to the contingency 85

Page 3 of 3 ends

amount of $160,000. With the award of the contract as Staff proposes, the total project construction cost could be $966,000, including a contingency amount of $160,000, funded by CIP No. ST0713.

Staff expects the construction phase of the project to begin in early 2023 and complete in spring 2023.

California Environmental Quality Act (CEQA)
This project is exempt under Section 15302 (Replacement and Reconstruction) of the CEQA Guidelines.

STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

A copy of this Staff Report was sent to St. Francis Electric and Alameda County Transportation Commission’s Independent Watchdog Committee. The City Council Agenda was posted.

ATTACHMENTS:
1) Resolution Approving the Plans and Specifications and Awarding a Contract to St. Francis Electric for Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713 2) CIP No. ST0713
3) Bid Results
86 Attachment 1
Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 1 of 2 RESOLUTION NO. XX - 23

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF DUBLIN
APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO ST.

FRANCIS ELECTRIC FOR THE CITYWIDE SIGNAL COMMUNICATIONS UPGRADE –

CONDUIT INSTALLATION FOR FUTURE FIBER INTERCONNECT ON DUBLIN BOULEVARD, CIP NO. ST0713
WHEREAS, the design team has completed the plans and specifications for the Citywide Signal Communications Upgrade – Conduit Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713, (Project), which includes the installation of a three-inch conduit and upgrading of pull boxes along Dublin Boulevard between City Hall and San Ramon Road; and
WHEREAS, the City of Dublin did, on December 13, 2022, publicly open, examine, and declare all sealed bids for doing the work described in the approved plans and specifications for the Project, which plans and specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to City Staff and St. Francis Electric was determined to be the lowest responsive and responsible bidder for doing said work.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the Plans and Specifications for the Project.

BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award the Contract for the Project to the lowest responsive bidder, St. Francis Electric at a base bid amount of $806,000, the particulars of which bids are on file in the Office of the Public Works Director.

BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to approve the Project contract change orders based on the appropriated funds designated for the Project up to the contingency amount of $160,000.

BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute the Construction Agreement with St. Francis Electric.
{Signatures on the following page}
87 Reso. No. XX-23, Item X.X, Adopted 01/10/2023 Page 2 of 2 PASSED, APPROVED AND ADOPTED this 10th day of January 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
______________________________
Mayor
ATTEST:
_________________________________
City Clerk
88 










!"#$%&$
'()*+,-./01 23-45 36738(9:2;<<=(329-3;(=>8?967 >@AB*,-?77- >?;C72-672?3>-3;( DEFG$HIJK#LM$HIJNFO#G$PJI$ME#$LJQMFQR#O$RH"I!O#G$JP$ME#$MI!PPFL$GF"Q!S$LJTTRQFL!MFJQG$GUGM#T$!QO$FQLSRO#G$ME#$I#HS!L#T#QM$JP$GF"Q!S$LJQMIJSS#IGV$LJQPSFLM$ TJQFMJIGV$!QO$W!MM#IU$W!LXRH$RQFMGV$!G$Y#SS$!G$T!Q!"FQ"$JQ"JFQ"$GF"Q!S$JH#I!MFJQG$JP$LJJIOFQ!M#O$LJIIFOJIGZ$[Q$\FGL!S$]#!IG$^_`ab^_$!QO$^_^_b^`V$ME#$HIJK#LM$ PRIME#I$#cH!QO#O$ME#$MI!PPFL$LJTTRQFL!MFJQ$Q#MYJIXV$LJQQ#LMFQ"$MI!PPFL$GF"Q!SG$JQ$\!SSJQ$dJ!O$!QO$D!GG!K!I!$dJ!OZ$DE#$HIJK#LM$YFSS$!SGJ$HIJNFO#$PJI$FQGM!SSFQ"$!$ Q#Y$LJQORFMV$I#TJNFQ"$ME#$#cFGMFQ"$LJHH#I$LJTTRQFL!MFJQ$L!WS#G$!QO$FQGM!SSFQ"$Q#Y$PFW#I$JHMFL$L!WS#G$JQ$eRWSFQ$fJRS#N!IOV$YEFLE$FG$!QMFLFH!M#O$MJ$W#"FQ$FQ$P!SS$ ^_^^Z$DE#$HIJK#LM$YFSS$!SGJ$#cH!QO$ME#$!O!HMFN#$MI!PPFL$GF"Q!S$GUGM#T$!SJQ"$X#U$LJIIFOJIG$!QO$YFSS$LJQQ#LM$#cFGMFQ"$!QO$Q#Y$HRWSFL$G!P#MU$FQPI!GMIRLMRI#V$GRLE$!G$ GFMR!MFJQ!S$!Y!I#Q#GG$L!T#I!G$!QO$!RMJT!M#O$SFL#QG#$HS!M#$I#LJ"QFMFJQ$L!T#I!GV$MJ$ME#$EF"EbGH##O$PFW#I$JHMFL$LJTTRQFL!MFJQG$GUGM#TZ$ $DE#$HIJK#LM$RHO!M#O$ME#$gFMU$JP$eRWSFQ$DI!N#S$e#T!QO$\JI#L!GMFQ"$hJO#S$MJ$HIJNFO#$MI!PPFL$PSJY$HIJK#LMFJQG$JQ$ME#$!IM#IF!S$!QO$LJSS#LMJI$IJ!OY!UG$!G$Y#SS$!G$ !Q!SUi#O$PRMRI#$S!QO$RG#$O#N#SJHT#QM$HIJHJG!SG$!QO$MI!QGHJIM!MFJQ$Q#MYJIX$LE!Q"#G$FQ$ME#$gFMUZ$[Q$jHIFS$^_^`V$ME#$HIJK#LM$I#GRSM#O$FQ$gFMU$gJRQLFS$!OJHMFQ"$!$ I#GJSRMFJQ$#GM!WSFGEFQ"$ME#$g!SFPJIQF!$kQNFIJQT#QM!S$lR!SFMU$jLM$mgkljn$MI!QGHJIM!MFJQ$MEI#GEJSOG$JP$GF"QFPFL!QL#$PJI$o#EFLS#$hFS#G$DI!N#S#O$mohDnZ$$ $DEFG$HIJK#LM$FG$H!IMF!SSU$PRQO#O$YFME$p#Q#I!S$\RQO$I#G#IN#$O#GF"Q!MFJQ$PJI$qQ#$DFT#$[QFMF!MFN#$b$g!HFM!SZ$$ JM#QMF!S$JME#I$PRQOFQ"$PJI$MEFG$HIJK#LM$T!U$FQLSRO#$ \#O#I!S$!QO$rM!M#$"I!QMGZ$ $9((=9:;>7?9-3(83<>92-s$tJQ#$
$<9(983(867>9?-<7(-u RWSFL$vJIXGw
$ xyxxzxyx{w|}~€}w‚~ƒ„
†‚†‡€w~ƒ„ˆƒ}‚w w $ †‰€‚}€†Šw|„‰€‰w ~ƒ„ƒw ‹†}ƒ‰w xyxŒzxyxxw ŽŠˆ†€wxyxxzxyxw xyxzxyxw xyxzxyx‘w xyx‘zxyx’w xyx’zxyx{w“Ž€Žƒ†w ‹†}ƒ‰ww €„€}‰w a`__$b$r!S!IF#G$”$f#Q#PFMG$ •–`V—%a$ •a`V˜˜—$ •—V–^_$ •—V–^_$ •—V–^_$ $ $ $ •`˜—V^™&$ a^__$b$gJQMI!LM$r#INFL#G$ •%–—V`_&$ •˜_˜Va&˜$ •`–%V___$ •`–%V___$ •`–%V___$ $ $ $ •`V–˜—V_—`$ a˜__$š$[THIJN#T#QMG$ •™&%V_—–$ •`Vaa—V``%$ •^a`V&^_$ •a`V&^_$ •`–`V&^_$ $ $ $ •–V`——V–%—$ a%__$š$hFGL#SS!Q#JRG$ •˜Va__$ $ $ $ $ $ $ $ •˜Va__$ a™__$b$k›RFHT#QM$ $ •%V`^_$ $ $ $ $ $ $ •%V`^_$ €„€}w œŒxžžžwœxžž’‘{w œ‘yyw œx‘yyw œx{‘yyw w w w œ’ž{x’w www
Attachment 2
89  


 





!"#$%&'%

()*+,*-./0)123. 41,01. 5361/. 7879:7877. ;)+-3<.7877:787=. 787=:787>. 787>:787?. 787?:787@. 787@:787A.()<)13. 5361/.. <0<6B/. CDDC%E%F$G$H"I%JKGL% MNOP'&Q% MCPRSDPCRN% % % % % % % MCP&DDPDDD% SSDC%E%TU"U$%F"V%W"X% % MCDRPDDD% % % % % % % MCDRPDDD% SSDR%E%Y$"VKH$%Z%T"I$V%W"X%E% [\]"I%TUH$$UV%JKGL%^_`W`a% MCN&P&&D% MNQPDOD% % % % % % % MSR'PbRD% SSDN%E%WJ`_cWH"GVd\HU"Ue\G% f\H%`I$"G%_eH% % MCRbPDDD% % % % % % % MCRbPDDD% SSCS%E%g$he]I$%i$#eVUH"Ue\G%J$$% ^_`W`a% MbOCPDND% MQCPbNb% MQ&PDRD% MQ&PDRD% MQ&PDRD% % % % M'SNP'bb% SSCR%j%Y$"VKH$%ZZ%T"I$V%W"X%j% [\]"I%TUH$$UV%JKGL%^_`W`a% % % MSDDPDDD% MSDDPDDD% MSDDPDDD% % % % MbDDPDDD% SSSD%E%i\"L%Y"eGUk%l%i$h"mk% _]]\KGU%^iYi_a% MQbP'RR% MRCNPRNb% MSDDPDDD% % MRDPDDD% % % % MbORPQSD% RQDC%j%n"VU$HG%oKmIeG% WH"GVd\HU"Ue\G%pqd"]U%J$$% MCNNPC&'%% MSSP'RS% % % % % % % MSDDPDDD% RQDR%E%r$VU$HG%oKmIeG% WH"GVd\HU"Ue\G%pqd"]U%J$$% % MCOOPDDD% % % % % % % MCOOPDDD% bQD&%E%pGU$HG"I%T$Hse]$%JKGL%E% ntKedq$GU% M'OPRNR% M'&PRSb% % % % % % % MCNRPODD% <0<6B. % u9v7>wvw>w.u7v>wwv@?A. u>=?v8>8. u7=?v8>8. u7A?v8>8. . . . u>v@w>vA7@. 6**)6B.04316<,*-.,x462<. . . . . . . . . 90 Citywide Signal Communication Upgrade
Conduit Installation for Future Fiber Interconnect on Dublin Blvd ST 0713
Bid Date:

BASE BID
ITEM Qty. UNIT Unit Cost Extension Unit Cost Extension Unit Cost Extension 1 1 LS $64,000.00 $64,000.00 $25,000.00 $25,000.00 $100,000.00 $100,000.00 2 1 LS $64,000.00 $64,000.00 $42,000.00 $42,000.00 $100,000.00 $100,000.00 3 1 LS $18,000.00 $18,000.00 $280.00 $280.00 $2,500.00 $2,500.00 4 1 LS $20,000.00 $20,000.00 $3,000.00 $3,000.00 $35,000.00 $35,000.00 5 1 LS $6,320.00 $6,320.00 $3,100.00 $3,100.00 $15,000.00 $15,000.00 6 5,990 LF $97.00 $581,030.00 $131.00 $784,690.00 $125.00 $748,750.00 7 3 EA $2,100.00 $6,300.00 $2,100.00 $6,300.00 $5,500.00 $16,500.00 8 330 LF $20.00 $6,600.00 $28.00 $9,240.00 $35.00 $11,550.00 9 6 EA $3,600.00 $21,600.00 $7,150.00 $42,900.00 $4,500.00 $27,000.00 10 11 EA $1,650.00 $18,150.00 $5,400.00 $59,400.00 $4,000.00 $44,000.00 TOTAL $806,000.00 $975,910.00 $1,100,300.00
List of Sub-Contractors
Farwest Safety Inc
SoCal Stormwater Runoff Solution
Services, Inc
Civil Golden Bay Construction Inc
GPRS
St. Francis Electric, LLC Columbia Electric
Columbia Electric
C3
Traffic Control
Excavate&Bore Tight Access Excavation Inc
W. Bradley Electric, Inc
Pioneer Underground
Construction
W. Bradley Electric, Inc

APPARENT LOW BIDDER
St. Francis Electric, LLC

CITY OF DUBLIN

ENGINEERING DIVISION

BID SUMMARY
December 13, 2022
Project Name:

Project No. :

PUBLIC WORKS DEPARTMENT
Directional Drilling
Description
Install Cabinet Riser
No. 6E Pull Box
Video Pipe Inspection
No. N48 Pull Box

DESCRIPTION
Mobilization (Max10% of the total base bid)
Inspect Existing Conduit
Caltrans Permit
3" Schedule 40 HDPE Conduit
Construction Area Traffic Control (Max 10% of the total base bid) Storm Water Pollution Prevention Plan
Sheeting, Shoring, and Bracing
1 Attachment 3
91 STAFF REPORT

CITY COUNCIL

Page 1 of 2 ends

Agenda Item 4.4
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SUBJECT: Agreement for Water Slide Maintenance Services at The Wave Prepared by: Dustin Stene, Recreation Supervisor
EXECUTIVE SUMMARY:

The City Council will consider an agreement with Slide Guys Restoration Inc. for waterslide maintenance services at The Wave.

STAFF RECOMMENDATION:

Adopt the Resolution Approving an Agreement with Slide Guys Restoration Inc. for Waterslide Maintenance Services and approve the budget change.

FINANCIAL IMPACT:

The agreement with Slide Guys Restoration Inc. is not to exceed $151,620 per calendar year, which includes $126,350 for regular maintenance and inspections, plus a 20% contingency of $25,270 for additional repairs as needed. Approval of the agreement will require a $37,593 budget increase funded by the General Fund Undesignated Reserve. Funding for the subsequent years will be included in future budget processes.

DESCRIPTION:

In prior years, The Wave pool and waterslide maintenance agreements were combined; however, due to the unique experience, skill set, and certifications required to maintain waterslides, a separate Request for Proposals (RFP) for waterslide maintenance was released on November 2, 2022. Slide Guys Restoration Inc. submitted the lowest responsive bid and their proposal aligns with the City’s needs. Other bids were received from Safe Slide Restoration and White Water.

Slide Guys Restoration Inc. is highly recommended by multiple agencies, two of which are in California, which gives them experience with the Occupational Safety and Health Administration (OSHA) regulations for California amusement rides. Slide Guys Restoration Inc. also meets 92

Page 2 of 2 ends

certification requirements for rope access safety and fiberglass repair. Slide Guys Restoration Inc. will be required to conduct a bi-annual service that includes fiberglass, chip and cracking, and gel coat repair, as well as joint caulking and the wax and polish of all slides.

Staff is recommending a three-year service agreement for water slide maintenance with Slide Guys Restoration Inc., expiring on December 31, 2025, with the option of two, one-year extensions. The cost detail is summarized in the table below.

Table 1: Slide Guys Restoration Inc. Cost Detail
STRATEGIC PLAN INITIATIVE:

None.

NOTICING REQUIREMENTS/PUBLIC OUTREACH:

A copy of the Staff Report was provided to Slide Guys Restoration Inc., and the City Council Agenda was posted.

ATTACHMENTS:
1) Resolution Approving an Agreement with Slide Guys Restoration Inc. for Waterslide Maintenance Services
2) Exhibit A to the Resolution - Agreement Between the City of Dublin and Slide Guys Restoration Inc.
3) Proposal - Slide Guys Restoration Inc.
4) Request for Proposals
5) Budget Change Form
Pre-Summer Service and Inspection $63,175
Post-Summer Service and Inspection $63,175
Contingency 20% $25,270
Total Cost $151,620
93 Attachment 1
Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 1 of 1 RESOLUTION NO. XX - XX

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF DUBLIN
APPROVING AN AGREEMENT WITH SLIDE GUYS RESTORATION INC. FOR

WATERSLIDE MAINTENANCE SERVICES
WHEREAS, Staff issued a Request for Proposals for waterslide maintenance services at The Wave; and
WHEREAS, Slide Guys Restoration Inc. emerged as the most cost effective company, and aligns with the City’s needs for biannual waterslide maintenance services; and WHEREAS, Slide Guys Restoration Inc. is highly recommended by multiple agencies; and is prepared to complete the work outlined in the Scope of Services.

NOW, THEREFORE BE IT RESOLVED, the City Council of the City of Dublin does hereby approve the agreement with Slide Guys Restoration Inc., attached hereto as Exhibit A in an amount not to exceed $454,860 through December 31, 2025.

BE IT FURTHER RESOLVED that the City Manager is authorized to execute the agreement, and make any necessary, non-substantive changes to carry out the intent of this Resolution.

PASSED, APPROVED AND ADOPTED this 10th day of January 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
______________________________
Mayor
ATTEST:
_________________________________
City Clerk
94 Attachment 2
95 96
97 98
99 100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com

BIANNUALMAINTNENANCE PROPOSAL
November 28, 2022
City of Dublin – Waterslide Maintenance
Dustin Stene, Recreation Supervisor
Dustin.stene@dublin
SUBJECT: BI-ANNUAL WATERSLIDE MAINTENANCE FOR CITY OF DUBLIN’S RFB.

Slide Guys Restoration would like to participate in the City of Dublin bi-annual waterslide maintenance.

Bid reads as follows - “WATERSLIDE TOWER This biannual service requires inspection and preparation/repair of all waterslides prior to the California Occupational and Health Administration (OSHA) inspection that occurs annually each April and again after the conclusion of the water park season each of October. Contractors should be prepared to inspect the slides and structures for any damages or ware and prepare slides for both the waterpark season opening and winter closure”. 1.

Preseason inspection and service must be completed by April 1 of each year. 2. Post season inspection and service must be completed by October 31 of each year.

Repelling will be required. To complete the repelling requirement, contractors must be emergency rope access certified and provide the certification to the city prior to performance of the project Repair any joint caulking
Repair chip or cracking in gel coat
Repair any separating seams or seams with “rise” or “run” e. Repair safety netting as require Repair safety netting as needed
Attachment - 3
117
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com Bi-Annual Maintenance Pricing
Please note: All ENCLOSED sections on all slides will be waxed but EXCLUDES 4 phase polish & Buff.

All open sections will be polished, buffed, & waxed.

ITEM: Slide A (Riptide Rider)
Notes: RAL – 251’
Work Description: 4 Phase Polish and wax – Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $11,295.00
ITEM: Slide B (Golden Wave)
Notes: RAL - 199’
Work Description: 4 Phase Polish and wax – Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $8,955.00
ITEM: Slide C (Mt Diablue)
Notes: RAL – 245’
Work Description: 4 Phase Polish and wax – Entire open sections – EXCLUDING Bowl • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $11,025.00
ITEM: Slide D (Shamrock Swirl)
Notes: RAL – 71’
Work Description: 4 Phase Polish and wax – Entire open sections 118
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $2,130.00
ITEM: Slide E (Dublin Screamer Speed Slide)
Notes: RAL 176’ (Repelling work required) Enclosed w/runout Work Description: 4 Phase Polish and wax – Entire open sections – EXCLUDING BOWL (Bowl will get waxed not buffed)
• Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $7,920.00
ITEM: Slide F (Emerald Plunge Speed Slide)
Notes: RAL – 154’ (Repelling work required)
Work Description: 4 Phase Polish and wax – Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $6,930.00
Aquatic Play Structure (Splash Zone)
ITEM: Slide G (Tandem Slide)
Notes: RAL – 14’
Work Description: 4 Phase Polish and wax – Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
119
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com • Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $2000.00
ITEM: Slide H (Children’s Tub Slide)
Notes: RAL – 36’
Work Description: 4 Phase Polish and wax – Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $1,620.00
ITEM: 2 Independent Runouts
Notes: RAL –
Work Description: 4 Phase Polish and wax- Entire open sections • Remove oxidation and scale build up (High-pressure wash 4,000 psi with biodegradable degreasing agent and hot water blast as per SSPCSP1 Standard) • Polish & Wax slide (Hand wax if necessary)
• Refurbish any minor chips
• Fully inspect exterior hardware
• Caulk seams with 3M-4000 as needed
Amount………………………………………………………………………………………. $1,300.00

*We recommend Marine Grade 3M-4000 for superior caulk.
** This bid includes repair of any separating seams or seams with “rise” or “run” ***Documentation for all repairs, that includes who made the repairs and the date, along with the scope of work will be submitted within five business days of repair TOTAL PROJECT COST – $63,175.00 Spring / 63,175.00 Fall ($10,000.00 is allotted for prevailing wage)
ESTIMATED TIME VALUE OF PROJECT – 7 to 10 DAYS
– WEATHER PERMITTING –
120
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com

PREMIUM PRODUCTS WE USE
Ashland Gel-Kote /Premium grade Vinyl Ester blend grade filler / 3M-4000 marine grade caulk / Epoxy Vinyl Ester Resin / Amerlock Clear Primer / PSX-700 Polysiloxane paint (marine grade) / Fiberglass – 1.5 oz. chop Mat & Biaxial 1088 /Acetone / 3M Super Duty Compound Gel coat is referred to the interior coating on fiberglass slides and is the only coating to be used to protect the underlying fiberglass, per the manufacture. White gel is recommended for more of a maintenance free, because white gel looks cleaner even when light oxidation is present.

Paint is only applied to the exterior of slides. A commercial marine grade paint is the only coating suitable for a slides exterior coating per manufacturer's recommendations.

Oxidation should be removed annually with a professional maintenance plan. Oxidation build up results in drag for riders and acts like sandpaper, scuffing mills of gel off slide when riders go down the slide.

Thinning gel is when mils are removed slowly over time with regular usage of slide, chemicals, weather, oxidation, and annual polish & buff. A slide that has the proper mils of gel coat applied (18-24mls) should last 8 to 10 years, if maintained properly.

Failed coatings Gel or paint– The coating lift, bubbles, peels. This may result from Incorrect product used, not mixed/applied properly, unsuitable weather conditions during application, or coating was not applied according to industry standards. Solution: Re-gel or repaint with Amerlock primer. Failed coatings compromise the fiberglass.

Only use Vinyl Ester Blend Grade Filler will be used for repairs.

Polish & Wax is a cosmetic refurbish. Structural refurbish is defined as an obvious threat to the guests.

Unless otherwise specified, in the work description above, structural refurbishment is not included in the proposal nor price. If Structural refurbishment is required and is not noted on the proposal to repair/refurbish, a change order will be required to include the refurbishment / repair.

Please note that large amounts of dust will be created from the project that we have no control over.

We do a thorough power wash afterwards, removing any dust caused by sanding, to restore cleanliness to the facility.
*Caulked seams are not a guarantee to stop them from leaking and are not under warranty.

Slides that require an additional coat of paint will be charged an additional 50% of first cote price due to time/materials/extra process to ensure premium quality outcome.

Slide Guys Restoration reserves the right to have adequate access to the project area in order to complete the project as efficiently as Slide Guys Restoration deems necessary. This may require, but not limited, to working 8 hours per day/5 days a week. The park is responsible for providing an adequate water source, electrical power (multiple circuits will be needed), restroom facilities.

Payment due upon completion of project, Wire transfer or via mail to 4342 Old M51, Croswell, MI 48422. Accounts 30 days past due are subject to a 5% late.

Warranty: If for any reason your paint, Gel coat, or structural refurbishment does peels, lifts, bubbles, flakes off or come apart (de-laminating) and you are within your warranty period, we will come out within 30 days to correct the issue.
121
Slide Guys Restoration, Inc. , 4342 Old M51, Croswell, MI 48422, 833.234.9255, www.slideguysrestoration.com • 5-year warranty on the paint for adhesion on waterslides • 1-year warranty on paint for adhesion on columns and kiddy structures • 5-year warranty on the structural fiberglass refurbish not to delaminate • 2-year warranty on the Gel Kote. Extend warranty to 5-year with yearly maintenance plan We, at Slide Guys Restoration, are committed to quality and customer satisfaction. We have serviced some of the largest water parks in North America and are looking forward to putting our experience to work for you. Please feel free to call our office at 833-234-9255 or my cell at 586.909.2001 if you have any questions. Thank you for your time and consideration.

Confidentiality Agreement
The information in this document is confidential to whom it is addressed and should not be disclosed to another person. It may not be reproduced neither whole, in part, nor may any of the information contained therein be disclosed without the prior written consent of the directors of Slide Guys Restoration.

Sincerely,
Jordan Bakeman
Customer Relations/Co-Owner
[email protected]
O: 833.234.9255
C: 586.909.2001
www.slideguysrestoration.com
122

REQUEST FOR PROPOSALS
Water Slide Maintenance
City of Dublin
Proposals must be received by: November 7
th
, 2022, before 4:00 pm
Dustin Stene, Recreation Supervisor
[email protected]
Proposals will be evaluated on the following: a) qualifications and specific experience of key project team members., b) quality and completeness of the proposal, c) experience with engagement of similar scope and complexity d), satisfaction of previous clients e) cost of providing the contractor services for this project.

Attachment - 4
123
Request for Proposal
For
Waterslide Maintenance
Overview
The City of Dublin is requesting proposals for waterslide maintenance services for the award winning, 31,000 square-foot Wave Aquatic Center located at Emerald Glen Park in Dublin, California. The boardwalk-themed waterpark includes a six-waterslide tower featuring two speed slides, and an aquatic play structure (splash zone). The maintenance services requested include biannual maintenance, inspections and as-needed services for the contract period beginning January 1, 2023, through December 31, 2025 with option of two, one-year extensions.

Project Description
The Wave waterslide amenities include:

1. A waterslide tower featuring 6 waterslides, including two speed slides and five runouts.

2. An aquatic play structure (splash zone) including two children’s waterslides with independent runouts and multiple spray features.

The City is seeking proposals from qualified waterslide maintenance providers interested in handling the regular ongoing waterslide maintenance as follows:

WATERSLIDE TOWER
This biannual service requires inspection and preparation/repair of all waterslides prior to the California Occupational and Health Administration (OSHA) inspection that occurs annually each April and again after the conclusion of the water park season each of October. Contractors should be prepared to inspect the slides and structures for any damages or ware, and prepare slides for both the waterpark season opening and winter closure.

1. Preseason inspection and service must be completed by April 1 of each year.

2. Post season inspection and service must be completed by October 31 of each year.

To properly inspect, maintain and repair (if necessary) the two speed slides. Repelling will be required. To complete the repelling requirement, contractors must be emergency rope access certified and provide the certification to the City prior to performance of the project.

Documentation for all repairs, including who made the repairs and the date, along with the scope of work should be submitted within five business days of repair.

3. Description
a. Four Waterslides
i. Slide A (Riptide Rider) – 251 ft
ii. Slide B (Golden Wave) – 199 ft
iii. Slide C (Mt. Diablue) – 245 ft
124
iv. Slide D (Shamrock Swirl) – 71 ft
b. Two Speed Slides (repelling work required)
i. Slide E (Dublin Screamer Speed Slide) – 176 ft
ii. Slide F (Emerald Plunge Speed Slide)– 154 ft
c. Six Slide Runouts

4. Waterslide Maintenance Services
a. Wax and inspect waterslides two times annually using “Stay Sealed” high gloss water slide protectant/sealant/wax to the complete surface of slide interior. i. Pre-season wax to be completed by April 1of each year ii. End of season wax to be completed by October 31 of each year iii. Hand polish all slides as needed
iv. High-pressure water wash (up to 4,000 p.s.i.) using biodegradable degreasing

1. Agent and steam/hot water blast where necessary, to remove any grease, oil, loose paint, dirt and oxidation.
b. Repair any joint caulking
c. Repair chip or cracking in gel coat
d. Repair any separating seams or seams with “rise” or “run” i. Perform Semi-Annual and Annual Inspections according to WhiteWater Manual.

1. Semi-Annual Inspection to be completed by October 31 after waterpark operation concludes and an Annual Inspection including completed repairs to be finished by April 1, before waterpark operation begins.

2. The inspection checklist must be submitted within five business days after the inspection. This should include the date and names of inspectors, as well as their signatures signing off on the completed inspection.

3. Submit repair estimates for anything that needs to be repaired and returned to manufacturer standards.

4. Check all joint caulking (Silkaflex 1a construction sealant by Silka needed) and provide an estimate for repairs of joints with partial, missing, or cracked caulking.

5. Check operation of interior nozzles for Slide D (Shamrock Swirl).

6. Other preventative maintenance including inspection of fiberglass for cracking, joint separation, or other concerns as related

7. Replace annual parts as indicated by WhiteWater on the Dublin Screamer drop slide (Slide E)

8. Send roller bar out for DPT testing per ASTM E147/E1417M

9. Replace filter cartridge (part 380188)

10. Replace 4 solenoid valves (part 342044)

11. Replace both bumpers (part 334849)

12. Replace rollers 2 (part 379987) and set screws 4 (part 379833)

13. Inspect drop slide air compressor and provide an estimate for repairs if needed
125
Aquatic Play Structure (Splash Zone)
Includes a WhiteWater Aqua Play structure and a variety of interactive play features. To properly inspect, maintain and repair the two children’s waterslides with independent runouts.

Documentation for all repairs that includes who made the repairs and the date, along with the scope of work should be submitted within five business days of repair.

1. Preseason service must be completed by the following dates April 1 of each year

2. Post season service must be completed by the following dates October 31 of each year

3. Description
a. Two Aqua Play Slides
i. Slide G Tandem Slide – 14 ft
ii. Slide H Child’s Tub Slide – 36 ft
b. Two independent runouts

4. Services
a. Wax waterslides two times annually using “Stay Sealed” high gloss water slide protectant/sealant/wax to the complete surface of slide interior. i. Pre-season wax to be completed by April 1each year
ii. End of season wax to be completed by October 31, each year iii. Hand polish both slides as needed
iv. High-pressure water wash (up to 4,000 p.s.i.) using biodegradable degreasing

1. Agent and steam/hot water blast where necessary, in order to remove any grease, oil, loose paint, dirt and oxidation. v. Perform Semi-Annual and Annual Inspections according to WhiteWater Manual.

1. Semi-Annual Inspection to be completed by October 31 after waterpark operation concludes and the Annual Inspection to be completed by April 1, before waterpark operation begins.

2. The inspection checklist must be submitted within five business days after the inspection. This should include the date and names of inspectors, as well as their signatures signing off on the completed inspection.

3. Submit repair estimates for anything that needs to be repaired and returned to manufacturer standards.

4. Check all joint caulking (Silkaflex 1a construction sealant by Silka needed) and provide an estimate for repairs of joints with partial, missing, or cracked caulking.

5. Other preventative maintenance including inspection of fiberglass for cracking, joint separation, or other concerns as related b. Repair any joint caulking
c. Repair chip or cracking in gel coat
d. Repair any separating seams or seams with “rise” or “run” e. Repair safety netting as required
Process and General Conditions
126

1. Proposers shall submit one electronic copy by emailed PDF attachment only. Do not submit via Cloud-based systems or link. Each submission shall be sent to Dustin Stene at [email protected] with the following subject line: Submittal for RFP for Waterslide Maintenance.

2. Deadline for submitting the proposal is Monday, November 7th, at 4:00 p.m.

3. The City will not pay for any costs incurred in preparation and submission of the proposals or in anticipation of a contract.

Schedule for RFP Process
October 19
th, 2022 Request for Proposals released.

November 1
st
, 2022 Deadline to submit questions to City of Dublin
November 4
th
, 2022 Addendum posted, if required
November 7
th, 2022 Proposals are due no later than 4:00 PM on November 7 th, 2022,
emailed as PDF attachment only
December 6th, 2022 Contractor Services Agreement scheduled for approval by the Dublin City Council.
(Tentative dates, subject to change)
RFP Submittal Requirements
Please prepare and organize your Statement of Qualification based on the requirements provided below. Any other information you would like to include should be placed in a separated section at the back of your Statement of Qualification. Please note however that the RFP submittal is limited to 30 pages maximum single sided (excluding resumes), and should be submitted in an 8 ½ x 11 format, in 12-point font. Page limit excludes a table of contents and resumes for Consultant’s team.

Interested contractors are requested to submit one PDF electronic copy of their Proposal as follows:

1. Enclose a cover letter not to exceed one page, describing the contractor’s interest and commitment to perform work necessary to provide pool maintenance services. The person authorized by the contractor to negotiate a contract with the City of Dublin shall sign the cover letter. Please include this cover letter within document and not as a separate page.

2. State the qualifications and experience of the contractor/individual(s). Please emphasize the specific qualifications and experience with engagements of similar scope and complexity.
127

3. Provide at least three references (names and current phone numbers) from recent work (previous five years) similar to the services outlined in this request for proposals. Please include a brief description of the work performed and the role performed.

4. List key staff members, including identification of the Project Manager/primary point-ofcontact. Include each team member’s availability, including all existing committed hours, and the ability of being able to perform services.

5. Provide an approach to performing the work, showing the flow of various tasks and demonstrating the clear understanding of the requested work.

6. Present BID form (Attachment B) proposed project budget, to include a compensation rate schedule for services.

7. Provide confirmation of ability to meet the City’s Standard Contractor Agreement and insurance requirements. Exceptions to the Agreement and insurance requirements shall be specifically noted in the Proposal.

Please provide electronic PDF copies of your Proposal to City offices no later than November 7 th, 2022, by 4:00 p.m. The entire Proposal (excluding resumes) should be a maximum of 30 pages. Submittals should be addressed to Dustin Stene via e-mail at: [email protected] Any Proposal submitted after the stated deadline will not be accepted for consideration.

Standard Contractor Services Agreement:

It is anticipated that the services covered by the Agreement resulting from this solicitation will be performed on a time and materials fee basis for a specified scope of work. The term of the agreement will begin January 1st, 2023.

A sample of the City’s Standard Contractor Services Agreement (Agreement), including insurance requirements, is provided as Attachment A.

If the interested contractor desires to take exception to the Agreement and/or insurance requirements, the interested contractor shall clearly identify proposed changes to the Agreement and furnish the reason for these changes, which shall be included in the qualification. Exceptions will be taken into consideration in evaluating Proposals. Otherwise, the interested contractor is to state in the proposal that the Agreement and insurance requirements are acceptable.

Consideration for exceptions will not be considered if not included in the submitted proposal.

Conflict of Interest
Proposer agrees that, for the term of this contract, no member, officer, or employee of the City of Dublin, or of a public body within Alameda County or member or delegate to the Congress of 128
the United States, during his/her tenure or for one year thereafter, shall have any direct interest in the contracts or any direct or material benefit arising therefrom.

Proposers must provide a list of any potential conflicts of interest in working for the City of Dublin. This must include, but is not limited to, a list of your f clients who are the following:

Private clients located or operating within the City of Dublin limits, Dublin San Ramon Service District, US Army Camp Parks and/or the County of Alameda, and a brief description of work for these clients. Proposers must also identify any other clients (including public entities), that may pose a potential conflict of interest, as well as a brief description of work you provide to these clients.

This list must include all potential conflicts of interest within the year prior to the release of this RFP as well as current and future commitments to other projects.

Principals and those performing work for City of Dublin may be required to submit a California Fair Political Practices Commission (FPPC) Form 700: Statement of Economic Interests documenting potential financial conflicts of interest. For additional information, proposers should refer to the FPPC website at http://www.fppc.ca.gov/Form700.html.

Equal Employment Opportunity
Proposer shall not, on the grounds of race, color, sex, age, religion, national origin, ancestry, physical handicap, medical condition, or marital status either discriminate or permit discrimination against any employee or applicant for employment in any manner prohibited by Federal, State or local laws. In the event of Proposer non-compliance, the City of Dublin may cancel, terminate or suspend the Contract in whole or in part. Proposer may also be declared ineligible for further contracts with the City of Dublin.

Proposer shall take affirmative action to ensure that applicants are employed, and that employees are treated during their employment, without regard to their race, religion, color, sex, or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. Proposer and its sub-contractors shall post in conspicuous places, available to all employees and applicants for employment, a notice setting forth the following provisions [29 U.S.C. § 623, 42 U.S.C. § 2000, 42 U.S.C. § 6102, 42 U.S.C. § 12112, 42 U.S.C. § 12132, 49 U.S.C. § 5332, 29 CFR Part 1630, 41 CFR Parts 60 et seq.].

Governing Law
This RFP summarizes the applicable laws and governance, when in conflict applicable State/Federal guidelines shall apply. The contract and legal relations between the parties hereto shall be governed and construed in accordance with the laws of the State of California.

Insurance Requirements
129
The Contractor shall provide insurance coverage as follows in conformance with the City of Dublin’s requirements:

Commercial General Liability Insurance $2,000,000
Automobile Liability Insurance $2,000,000
Professional Liability Insurance $1,000,000
Statutory Workers’ Compensation Insurance
and Employer’s Liability Insurance $1,000,000
References
Contractor must include three (3) references for which the company has provided services similar to those described in this RFP. Reference information shall include: Name, Address, Contact, Title, Phone Number, and Term of the Contract.

Review and Selection Process
The City reserves the right to make the selection based on its sole discretion. A subcommittee selected by City Staff will evaluate proposals provided in response to this RFP. Informal interviews may be conducted by City staff, and may include more than one contractor that has submitted a Proposal.

Based on input from this review process, a recommendation will be made to the City Manager.

The City Manager will make a recommendation to the City Council for award of contract services.

The City reserves the right to award a contract to the contractor that the City feels best meets the requirements of the RFP. The City reserves the right to reject any and all Proposals prior to execution of the Agreement, with no penalty to the City.

Selection of Contractor
Submitted Proposals will be evaluated and scored using the following criteria:
• Qualifications and specific experience of key project team members. • Quality and completeness of the proposal.
• Experience with engagement of similar scope and complexity. • Satisfaction of previous clients.
• Cost of providing the contractor services for this project. 130
Attachment A
Standard Contractor Services Agreement

CONTRACTOR SERVICES AGREEMENT BETWEEN

THE CITY OF DUBLIN AND CONTRACTOR

REMOVED EXAMPLE AGREEMENT FOR CITY

COUNCIL AGENDA PACKET
131
Services Agreement between [EFFECTIVE DATE]
City of Dublin and ______________ Exhibit B – Page 6 of 6 Attachment B

WATERSLIDE MAINTENANCE SERVICES - BID FORM
The City of Dublin will review proposals and select the lowest responsible bidder for the identified scope of work.

Name of Company:

Contact Person: Phone:

Mailing Address:

Email: Website:

The Wave Waterslide Maintenance-Optional
I. Regular Maintenance Services
$ __________ Semi-Annual Inspection
$ __________ Annual Inspection and Parts Replacement
$ __________ Pre-Season Waxing
$ __________ Post-Season Waxing
As Needed Maintenance and Repair Services
$___________ per hour for repair work and emergency maintenance work ____________ Response time for emergency repair or maintenance work II. Other Charges and Parts (if any)
$ __________ for __________________________________________________________ $ __________ for __________________________________________________________ 132
Services Agreement between [EFFECTIVE DATE]
City of Dublin and ______________ Exhibit B – Page 7 of 6 Attachment C – WhiteWater Manuals
(i) Waterslides Operations & Maintenance Manual
Prepared for:

Emerald Glen Aquatic Center
Dublin, CA
Project No. 31548
Date: May 11, 2018
Reviewed and submitted by:

Claudio Barrera P. Eng Eric Sinclair, Project
Manager
133
March 13, 2017 Page 2 Project # 31548 Emerald Glen Aquatic Center

DRAWINGS
Table of Contents
Group A Slide Path Layout – Emerald Glen Aquatic Center – Dublin, CA Project No. 31548 Drawing No. A200 Engineering Issued Dated December 1, 2015 Shutdown Lane Marking Procedure – Emerald Glen Aquatic Center – Dublin, CA Project No. 31548 Drawing No. S290 Engineering Issued Dated December 1, 2015 Slide Pumping Flow Diagrams, Slides AA, AB, AC– Emerald Glen Aquatic Center – Dublin, CA
Project No. 31548 Drawing No A600 Engineering Issued Dated December 1, 2015 Slide Pumping Flow Diagrams, Slides AD, AE, AF – Emerald Glen Aquatic Center – Dublin, CA
Project No. 31548 Drawing No A601 Engineering Issued Dated March 14, 2018 Slide Piping Detail, Slide AD– Emerald Glen Aquatic Center – Dublin, CA Project No. 31548 Drawing No A602 Engineering Issued Dated May 20, 2016 134
March 13, 2017 Page 3 Project # 31548 Emerald Glen Aquatic Center Part I GENERAL OPERATING GUIDELINES .............................................................................................7

1. Customers..............................................................................................................................7

1.1 Posted Signs...................................................................................................................7

1.2 Access............................................................................................................................7

1.3 Physical Condition.........................................................................................................7

1.4 Visitors and Spectators ..................................................................................................8

1.5 Food and Drinks.............................................................................................................8

2. Attendants..............................................................................................................................8

2.1 Top of Slides..................................................................................................................8

2.2 Splash Pool.....................................................................................................................9

2.3 Runout Lane...................................................................................................................9

2.4 Water Treatment ............................................................................................................9

2.5 Pool Operations..............................................................................................................9

3. Inspections.............................................................................................................................9

3.1 Slide Inspections..........................................................................................................10

3.2 Mechanical Inspections................................................................................................10

3.3 Chemical Inspections...................................................................................................10

4. Accidents.............................................................................................................................11

4.1 Incident Reporting .......................................................................................................11

4.2 Floatation Devices .......................................................................................................11

4.3 Slips and Falls..............................................................................................................11

4.4 Bodily Collisions .........................................................................................................12

4.5 Chemical Hazards........................................................................................................12

5. Emergency Procedures........................................................................................................12

6. Operator’s Changes.............................................................................................................13 Part II SPECIFIC OPERATING GUIDELINES ...........................................................................................15 POOL SIDER (PS) into Shutdown Lane – Slide AA .................................................................15

1. Posted Signs........................................................................................................................15

1.1. Entry Station ................................................................................................................15

1.2. Shutdown lane..............................................................................................................15

2. Attendants............................................................................................................................16

2.1. Attendant / top (start of ride) - 1 attendant per slide....................................................16

2.2. Attendant / shutdown lane: 1 lifeguard per 1 or 2 slides..............................................16

3. Vehicles...............................................................................................................................17

4. Water Flow..........................................................................................................................17 32”AQUATUBE (32) into Shutdown Lane – Slide AB.............................................................18

1. Posted Signs............................................................................................................................18

1.1 Entry Station ................................................................................................................18

1.2 Shutdown lane..............................................................................................................18

2. Attendants............................................................................................................................19

2.1 Attendant / top - 1 attendant per slide..........................................................................19

2.2 Attendant / Shutdown Lane: 1 lifeguard per 2 slides...................................................19

3. Vehicles...............................................................................................................................20 135
March 13, 2017 Page 4 Project # 31548 Emerald Glen Aquatic Center

4. Water Flow.........................................................................................................................20 32”AQUATUBE (32) & Poolsider Fusion into Shutdown Lane – Slide AC .................. 21

1. Posted Signs............................................................................................................................21

1.1 Entry Station ................................................................................................................21

1.2 Shutdown lane..............................................................................................................21

2. Attendants............................................................................................................................22

2.1 Attendant / top - 1 attendant per slide..........................................................................22

2.2 Attendant / Shutdown Lane: 1 lifeguard per 2 slides...................................................22

3. Vehicles...............................................................................................................................23

4. Water Flow..........................................................................................................................23 32”AQUATUBE (32) into shutdown Bowl - Slide AD................................................... 24

1. Posted Signs........................................................................................................................24

1.1 Entry Station ................................................................................................................24

1.2 Shutdown bowl ............................................................................................................24

2. Attendants............................................................................................................................25

2.1 Attendant / top - 1 attendant per slide..........................................................................25

2.2 Attendant / Shutdown bowl: 1 lifeguard per slide .......................................................25

3. Vehicles...............................................................................................................................25

4. Water Flow..........................................................................................................................26 SPEED SLIDE / FREEFALL/ HIGH SPEED waterslides (32, RS, SHUT) into ............ 27 shutdown lane, Slide AF ............................................................................................. 27

1. Posted Signs........................................................................................................................27

1.1 Entry Station ................................................................................................................27

1.2 Shutdown lane..............................................................................................................27

2. Attendants............................................................................................................................28

2.1 Attendant / top - 1 attendant per slide..........................................................................28

2.2 Attendant / shutdown lane: 1 lifeguard per two slides.................................................28

3. Vehicles...............................................................................................................................29

4. Water Flow..........................................................................................................................29 Part III MAINTENANCE GUIDELINES FOR FRP FLUME............................................. 31

1. Cleaning ..............................................................................................................................31

2. Waxing ................................................................................................................................31

3. Joints ...................................................................................................................................31

3.1 Joint Caulking ..............................................................................................................31

3.2 Joint Roughness...........................................................................................................32

4. Patching...............................................................................................................................32

4.1 Minor Chips and Cracks ..............................................................................................32

4.2 Surface Cracks.............................................................................................................32

4.3 Cracks around Flanges.................................................................................................32

4.4 Repair Procedures........................................................................................................33

4.4.1 Storage Instructions..................................................................................................33

4.4.2 Mixing Instructions ..................................................................................................33

4.4.3 Patching Instructions................................................................................................34 136
March 13, 2017 Page 5 Project # 31548 Emerald Glen Aquatic Center PART IV SUPPLEMENT TO MANUAL FOR ASTM STANDARDS ............................... 36

1. The ASTM standard F 2376-XX Standard Practice for Classification, Design, Manufacture, Construction, and Operation of Water Slide Systems................................36

2. The ASTM standard F 853 - XX Standard Practice for Maintenance Procedures for Amusement Rides and Devices.........................................................................................37 Appendix 1-I .................................................................................................................. 40 Appendix 1-II ................................................................................................................. 41 Appendix 1-III ................................................................................................................ 42 ADDENDUM: SHUTDOWN LANE FLOW TRANSITION DATA RECORDING SHEET,

FREE FALL, SLIDE AF
ADDENDUM: PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF

WATERSLIDE
137
i
[ ]
(a) NOTES:

1. FOR GENERAL NOTES AND SPECIFICATIONS SEE DWG 130.
1 T.O. DECK O SLIDE AA. AB & AC
_ -. 371.920'
LAYOUT AND DET,'JIS 0
SEE DWG. A340
I
I
I
I
I
Ye•
...,0(
FLUME INV. AD1
(2) 4@
Xe :1
C
1J\"r
M(3)
M(4)
M(5)
A(14)
AB(3)
- --
(4)
AB(5) \3)A
AC(3)
0 AC(4)
AC(5)
(3) 1
P60
0 0 ,
•
P50
6 P52
A0(3)
M(11),
I@) A(7)
AA(20)
•
0 ISSUED FOR CONSTRUCTION

REVISED AS NOTED

REVISED AS NOTED

REVISED AS NOTED
'

REVISED AS NOTED

ISSUED FOR INFORMATION
DEC 01/2015
OCT 19/2015
SEP 3012015
SEP 2512015
SEP 1412015
AUG 2012015
REV
'-

REVISION DESCRIPTION/ISSUE RECORD DATE
loESIGNEO BY
RP

DRAWN BY
KS
SCALE
'-
DATE
DATE
AUG 20/2015
AUG 20/2015
PROJ. ENG. CHECK

DRAFTING CHECK

ARCHIVE
FILE No
DATE
DATE
31548A200
J
NOTE:- IMPERIAL DIMENSIONS

ALL ELEVATIONS AND CO-ORDINATES ARE IN FEET

ALL OTHER DIMENSIONS ARE IN FEET AND INCHES
r
B. WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way,Richmond, B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax. (604) 273-4518
(a) SLIDE PATH LAYOUT
SCALE 1/8"=1'-o•
'
r
-
J

GROUP A
'

SLIDE PATH LAYOUT

EMERALD GLEN AQUATIC CENTER

DUBLIN, CALIFORNIA, UNITED STATES
\
138
LEGEND:
•
(..._;- \ 0

INDICATES YOKE LOCATION

INDICATES COLUMN LOCATION
J
139
NOTE:

AFTER CERTIFICATION
MEASURE "A" & "B" AND

PROVIDE MARKERS FOR

ALL TYPES OF SHUTDOWN LANE
AS SHOWN IN DETAIL 2 & 3.

PROVIDE PERMANENT MARKER

INDICATING OPERATIONAL WATER
DEPTH
SEE DETAIL2
NOTE:

1. FOR GENERAL NOTES AND SPECIFICATIONS SEE DWG 130.

2. SLIDE OUTLINE MAY NOT BE EXACTLY AS SHOWN.

PROVIDE PERMANENT
B MARKER INDICATING .

FLOW TRANSITION LOCATION
SEE DETAIL 3
A
3'-0' (900mm)

FLOW TRANSITION

LOCATION

ELEVATION- SHUTDOWN LANE
PROVIDE 1"(25mm) THICK

WATERPROOF ADHESIVE TAPE

OF CONTRASTING COLOUR ON

EACH SIDE OF FLOW

TRANSITION LOCATION
2 . . .

DETAIL3
SCALE1 : 10
FLOW TRANSITION LOCATION . 0 ISSUED FOR INFORMATION APR 26/2013 NK REV
3 DESIGNED BY

REVISIONDESCRIPTION/ISSUE RECORD
DATE PROJ. ENG. CHECK DATE
DATE PE .

DETAIL2
N.Kamarzina

DRAWN BY
N.Kamarzina
SCALE
DATE
1:100
APR 26 2013
APR 26 2013
-

DRAFTING CHECK - ARCHIVE
FILE No.

DATE
-
APR 26 2013
APR 26 2013
NOTE:- METRIC DIMENSIONS
SCALE1 : 10

WATER DEPTH MARKER

ALL ELEVATIONS AND CO-ORDINATES ARE INMETERS

ALL OTHER DIMENSIONS ARE IN MILLIMETERS
(2)

WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond, B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax (604)273-4518

SHUTDOWN LANE

MARKING PROCEDURE ---
PROJECT No.
-
DRAWING No.

S290

REVISION
FILE

0.00 : C:\Slides1\Rides\xxx-Shutdown Lane Solutions\SS-Profile_32AT-Freefall_14599-Mansfield\S290_1 LAST SAVED BY : natalie.kamarzina , ON Monday, April 29, 2013 3:24:20 PM ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF WHITEWATER AND SHALL NOT BE REPRODUCED OR USED ON ANY OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH WHITEWATER 140
4• 4•
I
►
►
z
-----<}-- REDUCER / INCREASER

PRESSURE/ VACUUM GAUGE
® FLOW METER
Q
;i;
0 '
0 N
z
Q
w
w
>
w
Q
w

TO SLIDE M

POOLSIDER ENTRY BOX
800 GPM
TO SLIDE lfJ

AQUATUBE ENTRY BOX
450 GPM

TO SLIDE AC

FUSION AT & PS ENTRY BOX
600 GPM I
T.O. PIATFORM
EL 403.427'

PUMP DATA
:WRATE

BOO GPM

SLIDE M SLIDE AB SLIDE AC

SHUTOOWN SHUTOOWN SHUTOOWN
4• 4• 4• 52 FT
POWER 15 HP
TYPE END SUCTION CENTRIFUGM.

QUANTilY 1
n
LANE
n n
LANE
n n
LANE
n
i
I I I I I I I I I I I I T.O. EL 371.92' DECK @) FLOW RATE 450 GPM j L ::_ _j IL j L ::. _j j L ::. _j TOH 52 FT
POWER 10 HP
I I
w
w 12·
w
i5
lo
[
0 i5
(i) 5
I I
10·
I k_
10·
END SUMP TYP.
►
►
lil!2
i
§
<Cl...,:-
C! II
"
R'""
a· ► b) "1--
-jru·
©

HAIR & LINT

STRANER
©
1112·
DRAN
® ® ®
5•
►
5• ►
TYPE END SUCTION CENTRIFUGM.

QUANTilY 1
§ FLOW RATE 600 GPM
TOH 52 FT
POWER 25 HP
TYPE END SUCTION CENTRIFUGM.

QUANTilY 1
► :i.t:: 113
0 1
a· "1---ju-1

HAIR & LINT
11/2"
0 11
!a1Ill
tn I
0 :?
Qw
a·
►

STRANER
c) "
1 -
-
-
j
u
-
1 ©
DRAN
---0--
-
+-J--
-
LEGEND

FLEXIBLE PIPE CONNECTOR
PUMP
CHECK VM.Vf.

BAil
VM.Vf.

BUT1£RfLY VM.Vf.
4• 4• 4•
4•
s
e
§
725 +/- 20 GPM 425 +/- 20 GPM 580 +/- 20 GPM
FLOW RATES SET DURING COMMISSIONING:
141
AE
u
--
··z
-
NW
["'"'°
"
OQ
oO
<Q
00w
:
v
"
I
DRAWN 6Y
AE
SCALE
[ ]
w N. T. S.
6" ►
w
00 HAIR &
LINT
5 z STRANER
w
0 z
<
1112·
ORAN
!I
ts
0 j
8 0

SLIDE AA, AB, & AC
"

I ISSUED FOR CONSTRUCTION
I oec""'°" I
ISSUED FOR INFORM/ITION AUG 2012015
l"·I

REVISION DESCRIPTION/ISSUE RECORD DATE PE
III. l
w
w<
<w
Zz
=
W
c!'
Q
:i:
u
N
..

W
Q
vw
0 '!I<
t=
O-z
J
Q
0 w
!:]
w
I
0 ci
;
NW
;-
,NWw
w··w
NOTE:- IMPERIAL DIMENSIONS

ALL ELEVATIONS AND CO-ORDINATES ARE IN FEET

ALL OTHER DIMENSIONS ARE IN FEET AND INCHES
r

1. WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond,B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax (604} 273-4518
J

GROUP A
"'

SLIDE AA, AB, & AC

SLIDE PUMPING FLOW DIAGRAM

EMERALD GLEN AQUATIC CENTER

DUBLIN, CALIFORNIA, UNITED STATES J
0 I
"'
bJ
Q
JJ<
(a) [eeo
,31"548
][ OSAWWGSo A600 Jr '"0'
0 NOTES:

1. THE SCHEMATIC SHOWN lllUSlRATES THE INTENDED FUNCTIONM.

REQUIREMENTS FOR THE MECHANICM. OPIERATION OF THE WATERSLIDES.

LOCM. PROJECT ENGINEERS MAY DESIGN SITE-SPECIFlC SYSTEMS THAT DIFFER FROM THIS WITH THE RESPONISIBIUlY FOR THE DESIGN RESTING 111TH THE LOCM. ENGINEER.

2. PUMP PERFORWHCE, DISCHARGE PIPE SIZE & DISCHARGE BUTTERFLY VM.Vf. ARE ESSENTIM. FOR PROPER SLIDE OPERATION.

3. PROVIDE THRUST BLOCKS OR RIGID CLAMPS AT M.L BENDS AND AS REQUIRED M.ONG THE LENGTH OF SUCTION AND DISCHARGE PIPING.

4. PUMP SUCTION FLANGE SHOULD BE BELOW POOL WATER L£Vf.L

5. PIPE HAS TO BE RIGIDLY CLAMPED TO UNDERSIDE OF TOWER WITHIN 4 FEET OF FLEXIBLE PIPE CONNECTOR.

6. DOUBLE SUCTION INTAKES ARE SHOWN AS A SAFE1Y PRECAUTION TO ELIMl TE ENTRAPMENT HAZARDS CAUSED BY THE PUMP SUCTION. "'

PUMPING FLOW DIAGRAM
DATE
AUG 13/2015
PROJ. ENG. CHECK DATE
DATE
AUG 13/2015

AS NOTED

DRAFTING CHECK

ARCHIVE
FILE No.

DATE
31548A600
"
r
142
iw
◄
Q.
2 wi
w"w
►
<
1 [
]
w 11/
4• 4•
Qa
I
aNza
inwQ

SLIDE AD DRAIN

CHANNEL BELOW BOWL
s· s·
nj
11 L

SLIDE AE

SHUTDOWN
LANEn
- 11
SLIDE f,f

SHUTDOWN
n LANEn 11 =- 11
IT.O. DECK
EL 371.56'

TO SLIDE AD

CHAMPAGNE BOWL ENTRY BOX
Fl.OW RA1£: 400 GPM
4•
TO SLIDE f,f

SPEEDSLIDE ENTRY BOX
300 GPM
4•
T.O. PLATFORM
EL 414.51'

TO SLIDE AE

LAUNCH AREAO PLATFORM
ELEV.+7FT
...

1.3 L/S

PUMP DATA
_Jl
jL c_ ' '
_Jl
SUPPLIED BY WHITEWATERt
(§ FLOW RATE : 730 GPM
TllH : 63 FT
10·
w
I" I
10· ,o· ..... END SUMP lYP. ►
TO CHAMPAGNE BOWL 2•

SPRAY PIPE
FLOW RATE: 30 GPM
--,,H><l---lf6"
DRY AIR 3 CFM
100 PSI
POWER : 20 HP
lYPE : END SUCTION CENTRIFUGAL
QUANTITY : 1
@ FLOW RATE : 370 GPM
8 TllH : 70 FT
a:'i POWER : 10 HP
;;l Ii, lYPE : END SUCTION CENTRIFUGAL 0 QUANTITY : 1
lsz
► 6"
►
c.-i

LAUNCH AREA
0 PLATFORM ELEV. 414.51'
w
► 8" r[J,
0 z HAIR
& LINT
6"
c.-i
N"

PNEUMATIC COMPRESSOR DATA
®
""
iii
ti:
0 Xwaw
I15
,.J 1
;;l!i l
8"
►
STRAINER DRAIN r 6" r[J, 6"
c.-i

TO SLIDE AE
INJECTORSO AE23
FLOWRA1£: 350 GPM
\
112
- AIR AND WATER PIPING ROUTED

THROUGH CENTER REAR OF LAUNCH
ROUGH OPENING IN DECK. PIPING IS

CONCEALED IN FRP LAUNCH
00 ENCLOSURE.

FLOW RATE

PRESSURE
POWER

QUANTITY
3 CFM
100 PSI 3 HP 1
>z- <za
0 wm
00 w
000Qwmw 0zJJ<

HAIR& LINT

STRAINER
N !1/2"
DRAIN

SUPPLIED BY WWI
ASSEMBLED WITH 6"
PVC TEE.

TO BE INSTALLED WITHIN
(10'-15') OF LAUNCH
CAPSULE.
er
1 1/2"
SUPPLI
BY
WHIT
0 ENSURE SLIDE IS
ASSEMBLED WITH 4"

PVC INJECTORS

ORIENTED AS SHOWN
/2"
1/2"

AIR LINE
I
m0z< 1/2" ww PNEUMATIC COMPRESSOR '-..-.._

AIR LINE
►
I
" SUPPLY BY OTHERS "I r.:;
-,7
0 L_ _J IQ00

RIREVISED AS NOTED

G I REVISED AS NOTED
0 I ISSUED FOR CONSTRUCTION
l

ISSUED FOR INFORMATION
2018-03-14
MAY 2012016
DEC 0112015
AUG 20/2015
0 z<
/::

REVIREVISIONDESCRIPTION/ISSUE RECORDI DATE
"
roESIGNED BY DATE PROJ,ENG, CHECK DATE
AE AUG 13/2015
_Q
w
oO
<QmwI

DRAWN BY
AE
SCALE
DATE
AUG 13/2015

AS NOTED

DRAFTING CHECK

ARCHIVE
FILE No.

DATE
31548A601
J
w
,.
!,I<
<
Z
m
WQ
z
'<:
(a) SLIDE AD, AE,& AF

NOTE,- IMPERIAL DIMENSIONS

ALL ELEVATIONS AND CO-ORDINATES ARE IN FEET

ALL OTHER DIMENSIONS ARE IN FEET AND INCHES
r
'
::
o
:!
C:
..Q -m
..
0 z
!,I<
m0 J0
Q<
(b) PUMPING FLOW DIAGRAM
N. T. S.

WHITEWATER
WhiteWater West Industries Ltd
6700 McMillanWay,Richmond,B.C.Canada V6W 1J7
Tel (604) 273-1068 Fax (604) 273-4518
'
r
J
0 w w
ic
I . o
owI m
w
-
awm N
GROUPA
'

SLIDE AD, AE,& AF

SLIDE PUMPING FLOW DIAGRAM

EMERALD GLEN AQUATIC CENTER

DUBLIN, CALIFORNIA, UNITED STATES
w
----Cl-
0 ------cJ--
er®
--
-----i.tj-- BUTTERflY
VALVE
PUMP

REDUCER/ INCREASER

PRESSURE/ VACUUM GAUGE

FLOW METER

FLEXIBLE PIPE CONNECTOR
BALL

VALVE CHECK VALVE
4• 4•
LEGEND
-
I
">-
--
S:

J
®®
r
'
FLOW RATES SET DURING COMMISSIONING:
400 +/- 20 GPM 240 +/- 20 GPM
245 +/- 25 GPM
143
'
w
<I
0"
OJJJ
Q<
0031,548 )[ GS>WWG"' A601

2. PUMP PERFORMANCE, DISCHARGE PIPE SIZE & DISCHARGE BUTTERFLY VALVE ARE ESSENTIAL FOR PROPER SLIDE OPERATION.

3. PROVIDE THRUST BLOCKS OR RIGID CLAMPS AT ALL BENDS AND AS REQUIRED ALONG THE LENGTH OF SUCTION AND DISCHARGE PIPING.

4. PUMP SUCTION FLANGE SHOULD BE BELOW POOL WATER LEVEL

5. PIPE HAS TO BE RIGIDLY CLAMPED TO UNDERSIDE OF TOWER WITHIN 4 FEET OF FLEXIBLE PIPE CONNECTOR.

6. DOUBLE SUCTION INTAKES ARE SHOWN AS A Sf,fETY PRECAUTION TO ELIMINATE ENTRAPMENT HAZARDS CAUSED BY THE PUMP SUCTION.

AutoCAD SHX Text
--------------------------------------------
FLOW RATE: 30 GPM
144
. 9 9 9 9 9 9 9 9 9 9 9 9 9 9
!
G)
♦
t
u
··
-
NW
G)
NQ
oO
<Q
00w
:
v
"
I
DRAWN 6Y
AE
SCALE
[ ]
w
BAil VIJ..VE
REDUCER / INCRrASER
S.S. NUT
w
S.S. WASHER
DATE
Q
;i;
0 '
0 N
z
Qw
i5
>
Q
i"
14 SPRAY NOZZLES IJ..ONG TOP OF CHAMPAGNE BOWL
30 GPM TOTAL. 10 PSI REQ'D AT NOZZLE
1/2 0.D. TUBING ----. I I I I I I I I I I I I I
TYP.
1 •
I.D. HOSE (HJ 1
•
I.D. HOSE

FROM PM
(SEE DWC. 601)
2·
2·
l><l-ls;+-N
DRAIN

SUPPLIED BY WHITEWATER
0 SEE EQUIPMENT UST
w
w CHAMPAGNE
i5 N. T. S.
lo
[
0 i5
(i) 5
►
z
0 BOWL SPRAY PIPING SCHEMATIC
2' PVC PIPE FROM PUMP PM

EXACT LOCATION TO BE
0 §

ID HOSE
0 :?
Qw
w
00 5
z NOZZLE
(14 PLACES)
w
0 z
<
!I 1/4ilT X 1/2'
,r I
I I
I I

PUSH-TO-CONNECT ADAPTER
ts I I
0 I I

G I GENERAL REVISED
0 I ISSUED FOR CONSTRUCTION
MAY 2012016
DEC 0112015
112 -u
1 ISSUED FOR INFORM/ITION AUG 2012015
8 • OD TUBING ' j\ 1
0 ZZl£
LREV
[
REVISION DESCRIPTION/ISSUE RECORD DATE ee
IV. l
w
w<
<w
Zz
=
W
c
Q
!':i:
u
N
..

W
Q
vw

WATER SPRAY FROM NOZZLE

INSIDE FACE OF

SUPER BOWL BOOY
NOTE:- IMPERIAL DIMENSIONS

ALL ELEVATIONS AND CO-ORDINATES ARE IN FEET

ALL OTHER DIMENSIONS ARE IN FEET AND INCHES
r

1. WHITEWATER
..
0z
'!I<
t=
O-z
J
Q
0 w
!:]
w
I
0ci
;
N
;-
W
,NWw
w··w

CHAMPAGNE BOWL SPRAY PIPING PLAN
1/4'=1'-o'

SPRAY PIPE INSTALLATION
5•=1·-0·

DETAILS
(14 UNITS)
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond,B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax (604} 273-4518
r

GROUP A

SLIDE AD

SLIDE PIPING
DETAIL

EMERALD GLEN AQUATIC CENTER

DUBLIN, CALIFORNIA, UNITED STATES
.

J
,
J
DATE
AUG 13/2015

AS NOTED
AUG 13/2015
1/4' NIYF BRASS NO
I

Y-STRAINER
-
----c}--
LEGEND
G)
"'"A"E
"
PROJ. ENG. CHECK DATE

DRAFTING CHECK

ARCHIVE
FILE No.

DATE
31548A602
i
.,
145
0 I
"'
bJ
Q
JJ<
[eeo,31"548 ][ OSAWWGSo A602 ]f "Go,
146
March 13, 2017
Center

Page 6 ends

(i) PART I

GENERAL OPERATING GUIDELINES
147
March 13, 2017
Center

Page 7 ends

Part I GENERAL OPERATING GUIDELINES
Important Notice
The following operating procedures are presented to waterslide owners as guidelines only. They are not intended to be mandatory or exhaustive. These guidelines do not replace proper consultation with designers, manufacturers and legal counsel, and compliance with local, state (provincial) and federal laws and regulations involving, but not limited to: health, safety and building codes.

General Operating Considerations

1. Customers
While customers are the key ingredients to the success of any waterpark, certain rules and procedures must be made clear for the park to function efficiently and safely.

1.1 Posted Signs
A sign must be posted at the entrance to the waterpark that states user responsibility and conveys the following rules and regulations:

1. Read and obey all posted signs.

2. Obey all instructions given by the attendants and operators.

3. No glass, cigarettes and/or food are permitted in the water slide area.

4. Anyone under the influence of alcohol or drugs will not be permitted in the park.

5. Pregnant women and those with a history of heart problems or back trouble should not use the slides.

6. Failure to follow rules and instructions can lead to serious injuries.

7. Ride at your own risk.

Note: Specific sign requirements for each waterslide are detailed in Part II - Specific Operating Guidelines.

1.2 Access
Provisions must be made to prevent customers from entering the water slide at any points other than at the designated entry access points.

1.3 Physical Condition
Waterslide customers must be checked for proper swimwear and adequate physical condition. Swim attire should not have any metal parts that could damage the slides or cause injuries. Customers who show signs of drug and/or alcohol impairment will not be permitted on the site. 148
March 13, 2017
Center

Page 8 ends

1.4 Visitors and Spectators
Visitors and spectators should be physically separated from the areas used by sliders. They should be kept a safe distance away from any wet areas and not be permitted to interfere with the sliders.

1.5 Food and Drinks
No food or drinks are allowed in the immediate area of flumes and pools or on decks, stairs and walkways surrounding flumes and pools. Food and beverages should be confined to visitor and spectator areas or similarly marked areas for sliders. Trash containers should be provided to keep litter off decks and walkways and out of flumes and pools.

2. Attendants
Waterpark attendants are responsible for safe and orderly conduct of customers, safe entry and exit of riders from the slides, general crowd control and emergency procedures.

During operating hours, there must be at least one attendant on duty at all times who has completed a Red Cross or equivalent Standard First Aid and Safety course. This person must also be competent in carrying out any emergency procedures specific to the slide he or she is operating.

Every water slide should be equipped with a battery or electronically operated system to provide voice communication between attendants at different locations on the slides and park office or permanently manned control center.

2.1 Top of Slides
The area at the top of every water slide must be supervised by at least one attendant who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner.
• Ensuring that customers enter slides or rafts/mats properly. • Ensuring that customers are dispatched at safe intervals. • Visually surveying all areas of the water slide that are visible from attendant’s position, with the exception of the splash pool, and communicating any problems to the other attendants.
• Ensuring that customers meet the minimum and/or maximum restrictions for the slide.
• Ensuring that any vehicles used are in good condition and if inflated, inflated properly.
149
March 13, 2017
Center

Page 9 ends

2.2 Splash Pool
The recommended depth for the splash pool is 3.5 feet (1.07 metres) except otherwise noted in special conditions and therefore must be supervised by at least one certified lifeguard who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner.
• Ensuring that customers move into and out of splash pool in a quick and orderly manner.
• Controlling running, horseplay or other unsafe behavior on pool decks. • Ensuring pool water levels are correct.

2.3 Runout Lane
The runout lanes of waterslides must be supervised by at least one attendant who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner.
• Ensuring that customers exit runout lane in a quick and orderly manner.
• Controlling running, horseplay or other unsafe behavior on slide apron. • Ensuring water levels are at level marks and flow transition is within indicator markings.

2.4 Water Treatment
A specific person on each shift should be responsible for chlorination and water treatment procedures. They should be thoroughly trained in all aspects including, routine operations, handling, connection, disconnection, emergency procedures and leak control procedures. A safety chart should be posted in or near the chlorination room and a second safety chart should be placed in the pool office near the telephone. Emergency telephone numbers should also be shown on the safety charts.

2.5 Pool Operations
A specific person on each shift should be made responsible for all swimming pool operations, such as: circulation and filtering system operation, maintenance, inspections, backwashing and cleaning. They should be thoroughly trained by an expert in swimming pool operations.

3. Inspections
Permanently bound log books should be kept to record all inspections, operational tests, water quality monitoring, all accidents and unusual occurrences. Log books should be kept for a period of at least six (6) years from 150
March 13, 2017
Center

Page 10 ends

the date of the last entry. Log book entries that cover the twelve (12) month period previous to the last entry in the log book should be kept readily available.

3.1 Slide Inspections
Daily inspections must be made to check for:
• obstructions in slide paths
• cracks, chips or bubbles in sliding surfaces
• rough patchwork at joints or cracks
• caulking protruding from joined flanges
• leaking seals at joints
• loose risers on turns
• excessive movement of flumes when walked on
• joints opening up
• proper inflation and condition of rafts, tubes and vehicles • landing or pool bottom padding, if used, is in good condition and properly secured.

3.2 Mechanical Inspections
Daily inspections must be completed on each waterslide:
• before water is circulated to ensure no safety hazards exist • with the water circulating to ensure there is sufficient water flowing in the channel and correct water level is in splash pool or runout lane • to ensure that all the pumping and filtration equipment is operating correctly
• to ensure that conveyor system is operating properly and poses no hazard It is the attendant's responsibility to ensure water flow is maintained in accordance with manufacturers’ guidelines. Serious hazards may develop when flow is interrupted in a flume.

3.3 Chemical Inspections
Proper water chemical balance must be obtained each day before the facility is opened to the public. While the facility is operational, water quality testing should be performed at intervals in accordance with local health authority’s guidelines. Inspections should also be made during periods of heavy usage to ensure circulation and filtration systems are handling peak loads. The attendant must keep logs of all water testings performed. A typical form for water quality testing is shown in Appendix 1-I.

The attendant must ensure that customers cannot come in contact with water treatment, re-circulation and filtration equipment. Mechanical and chemical storage rooms must be locked at all times to prevent customer access. 151
March 13, 2017
Center

Page 11 ends

4. Accidents
The most common accidents in waterparks are: slips and falls, collisions between one riding customer and another customer, impact with the pool surface, and abrasions from sidewalls. Operators should keep detailed logs of all reported accidents onsite. A typical accident report form is included in Appendix 1-II.

4.1 Incident Reporting
The owner or operator shall notify the manufacturer (Whitewater West Industries Ltd.) of any known serious incidents that require immediate hospital admission. Minor injuries that may or may not require treatment shall be reported to the manufacturer if deemed to be related to the equipment design or function.

There may be local jurisdiction and laws requiring notification of incidents.

The owner or operator may be required to notify these local jurisdictions in addition to the above.

4.2 Floatation Devices
The operator should not infer that rafts, tubes or any other floatation device, with exception of government approved life jackets, offer the user any safety benefit. Where unapproved floatation devices are provided, signs should be posted stating they are for pleasure only and should not be used as a substitute for approved floatation devices.

4.3 Slips and Falls
Slips and falls are a constant concern in all areas of the waterpark. All surfaces intended for pedestrian traffic, whether in the water, on walkways, on loading platforms or on stairs should be made and maintained slip-resistant.

Proper periodic maintenance of walking surfaces should be carried out to remove the growth of algae and fungi which could inhibit the surfaces intended function. Adequate drainage should be maintained around all areas of the slides.

The entry section to flumes should be given particular attention with respect to slips and falls. The combination of the flowing water and the customer contacting water on a slippery surface for the first time can be confusing and disorienting. The exit area of the splashdown pool will always be wet and flowing with water which requires special attention with respect to slipresistant surfaces, drainage and number and location of attendants.

To minimize slip and fall type accidents, attendants throughout the waterpark should control running and horseplay.
152
March 13, 2017
Center

Page 12 ends

4.4 Bodily Collisions
Bodily collisions occur in flumes and splash pools as a result of riders traveling at different speeds and riders slowing or stopping in the flume.

Restricting traffic flow with proper dispatching intervals can minimize these bodily collisions. The top attendant and lower attendant must have a view of much of the slide and a means of communication between them. The entry attendant must be alert and aware that people will travel at different rates due to variations in body weight, body friction, and rider position. Generally, the heavier the person, the faster the rider will travel. Slippery materials like nylon slide much faster than cotton clothing. All other factors being equal, riders in a sitting position will travel slower than a person lying flat on their back. Under no circumstances should customers be permitted to ride flumes in a standing position. Similarly, running or leaping entry into flumes is not to be permitted.

In addition to slide entry attendants, use of signal lights or electro-mechanical starting gates should be considered for rider entry control.

As bodily collisions in splash pool area cannot be fully controlled even with proper entry rates; splash pool attendants should be well trained, attentive and aggressive, continuously urging and encouraging customers to leave the flume discharge and splash pool area as quickly as possible. They must be alert to the possibility of problems and be prepared to enter the water at any time to assist a customer. In the event of a delay at discharge, following riders should be stopped at the entry. Riders tend to congregate in the pool because they are temporarily confused and disoriented upon impact with the water, to wait for their friends who are coming behind, or to socialize with persons in the splash pool. Collisions also result from multiple rider entry (i.e. trains). This practice is absolutely prohibited even for small children being carried on their parent's legs.

If marker buoys or lane ropes are used in the splash pool, they must be arranged so they do not become obstacles for riders. Such devices, if used, should float and be simple in design to avoid the possibility of entangling riders.

4.5 Chemical Hazards
Personnel must be fully trained in the use of water chemicals. Potentially fatal accidents could result from the release of gaseous chlorine. Improper chemical control could result in skin and eye irritation from excessive treatment. Bacterial problems could also arise from inadequate treatment.

5. Emergency Procedures
Every park must have an emergency plan with specific procedures covering:
• crowd control
153
March 13, 2017
Center

Page 13 ends

• park evacuation
• drowning
• heart attacks
• cuts and burns
• neck and spinal injuries
• power or other utility failures
• fires
• security (fights, robbery, vandalism)
• exposure to chlorine
• environmental conditions (e.g., lightning, windstorms, hail, earthquakes) An emergency plan should address those factors which affect, human safety, protection and correction of equipment, and customer relations. All employees should be trained and drilled periodically in the execution of the emergency plan.

The emergency plan should be easily accessible and be located with first aid equipment and emergency telephone numbers.

Each facility should have a list of current emergency numbers posted by a telephone. The list should include the contact information for the nearest available doctor, ambulance service, hospital, rescue service, police department, fire department and poison control center. A typical emergency telephone list is shown in Appendix 1-III.

Each facility should have available the following first aid supplies:
• A standard 24-unit first aid kit stocked and readily accessible for use. • A stretcher and blankets.
• A standard plywood backboard or other acceptable splint for persons with back and neck injuries.
• An area or room set aside for the emergency care of injuries.

6. Operator’s Changes
WhiteWater should be advised of any changes made in slides, structures or equipment, manufactured, designed or installed by WhiteWater West Industries Ltd. Changes could affect the safety of the attraction. 154
March 13, 2017
Center

Page 14 ends

(ii) PART II

SPECIFIC OPERATING GUIDELINES
155
March 13, 2017
Center

Page 15 ends

Part II SPECIFIC OPERATING GUIDELINES
POOL SIDER (PS) into Shutdown Lane – Slide AA
The primary operating concern in Pool Sider Slides is the possibility of one riding customer colliding with another customer, either in the flume or in the shutdown lane. This type of occurrence can be minimized by the use of well-trained attendants controlling entry and exit conditions. Other safety considerations include: slips and falls in the entry and exit areas, abrasion from the sidewalls, and impact with the shutdown lane surface.

1. Posted Signs

1.1. Entry Station:

Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load: 1 person, 300 lbs. (136 kg)

2. Children less than 40 inches (1.02 m) tall are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swim wear with exposed zippers, buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back or in a sitting position. Sit up to go slower or lay down to go faster.

8. Riders must wait for the attendant’s start signal before starting the ride.

9. Keep arms and hands inside the flumes at all times.

10.Do not run, dive, stand, kneel, rotate or stop in the slide.

11.At the end of the slide, obey all instructions by shutdown lane attendant and exit quickly.

12.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

1.2. Shutdown lane:

Signs should be posted at the shutdown lane to convey the following rules and regulations:

1. Do not block the end of the slide.

2. Leave the shutdown lane quickly and orderly.
156
March 13, 2017
Center

Page 16 ends

3. No swimming or flotation devices allowed in the shutdown lane.

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

2.1. Attendant / top (start of ride) - 1 attendant per slide This requirement may be relaxed to not less than one attendant per platform area or level, provided that the operator ensures that attendants are able to fulfill all duties as listed.

Duties:

1. Ask each rider if they know how to ride the ride.

2. Assure the rider is in the correct body position when ready.

3. Control dispatch of riders one at a time and shall not dispatch a rider until the flume is clear of obstruction and any previous rider.

4. Ensure all riders meet requirements.

5. Ensure eyeglasses are securely affixed to the riders.

6. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

7. Observe riders for any physical impairments that compromise safety and do not allow them on the slide.

8. Ensure the crowd behaves in a safe and orderly manner.

9. Monitor riders in areas visible from assigned positions.

2.2. Attendant / shutdown lane: 1 lifeguard per 1 or 2 slides.

Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown lane immediately upon splashdown. Do not permit guests to sit on or congregate around shutdown lane.

4. Be prepared to enter shutdown lane to assist customer out of lane.

5. Do not allow any swimming or flotation devices in shutdown lane.

6. Monitor water level and characteristics of the shutdown lanes.

Shutdown lanes require extra attention to make sure water levels are at correct operating levels and flow transition has stabilized. 157
March 13, 2017
Center

Page 17 ends

Too little or too much depth in the shutdown lane will affect braking distance and characteristics.

7. Signal the dispatch attendant as to when it is okay to dispatch another rider when:
i. flume and shutdown lane are clear of previous riders and, ii. water level has recovered to marked level and,
iii. flow transition is stable between markings!

3. Vehicles
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.

4. Water Flow
Refer to attached mechanical drawing, A600, for design and commissioned water flows. Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative. Any variations from flows after certification must be approved in writing by WhiteWater. 158
March 13, 2017
Center

Page 18 ends

32”AQUATUBE (32) into Shutdown Lane – Slide AB
The primary operating concern in the 32”Aquatube into shutdown lane is the possibility of one riding customer colliding with another customer, either in the flume or in the shutdown lane. This type of occurrence can be minimized by the use of well-trained attendants controlling entry and exit conditions. Other safety considerations include: slips and falls in the entry and exit areas, abrasion from the sidewalls, and impact with the shutdown lane surface.

1. Posted Signs

1.1Entry Station
Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load 1 person, 300 lbs (136 kg).

2. Person under 40 inches tall (1.02 m) are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swim wear with exposed zippers, buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back with legs firmly crossed at the ankles and arms folded across the chest (to prevent elbows contacting the flume).

8. Riders must wait for the attendants start signal before starting the ride.

9. Do not uncross your legs or attempt to sit up until you come to a stop in the shutdown lane.

10.Do not run, dive, stand, kneel, rotate or stop in the slide.

11.At the end of the slide, obey all instructions by attendant and exit quickly.

12.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

1.2Shutdown lane
Signs should be posted at the shutdown lane to convey the following rules and regulations:

1. Do not block the end of the slide.

2. Leave the shutdown lane quickly and orderly.

3. No swimming or flotation devices allowed in the shutdown lane. 159
March 13, 2017
Center

Page 19 ends

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

2.1Attendant / top - 1 attendant per slide
This requirement may be relaxed to not less than one attendant per platform area or level, provided that the operator ensures that attendants are able to fulfill all duties as listed.

Duties:

1. Ask each rider if they know how to ride the ride.

2. Assure the rider is in the correct body position when ready.

3. Control dispatch of riders one at a time and shall not dispatch a rider until the flume is clear of obstruction and any previous rider.

4. Ensure all riders meet requirements.

5. Ensure eyeglasses are securely affixed to the riders.

6. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

7. Observe riders for any physical impairments that compromise safety and do not allow them on the slide.

8. Ensure the crowd behaves in a safe and orderly manner.

9. Monitor riders in areas visible from assigned positions.

2.2Attendant / Shutdown Lane: 1 lifeguard per 2 slides
Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown lane immediately upon splashdown. Do not permit guests to sit on or congregate around shutdown lane.

4. Be prepared to enter shutdown lane to assist customer out of lane.

5. Do not allow any swimming or flotation devices in shutdown lane.

6. Monitor water level and characteristics of the shutdown lanes. Shutdown lanes require extra attention to make sure water levels are at correct operating levels and flow transition has stabilized. Too little or too much depth in the shutdown lane will affect braking distance and characteristics.
160
March 13, 2017
Center

Page 20 ends

7. Signal the dispatch attendant as to when it is okay to dispatch another rider when:
i. flume and shutdown lane are clear of previous riders and, ii. water level has recovered to marked level and,
iii. flow transition is stable between markings!

3. Vehicles
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.

4. Water Flow
Refer to attached mechanical drawing, A600, for design and commissioned water flows. Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative. Any variations from flows after certification must be approved in writing by WhiteWater. 161
March 13, 2017 Page 21 Project # 31548 Emerald Glen Aquatic Center 32”AQUATUBE (32) & Poolsider Fusion into Shutdown Lane – Slide AC The primary operating concern in the 32”Aquatube into shutdown lane is the possibility of one riding customer colliding with another customer, either in the flume or in the shutdown lane. This type of occurrence can be minimized by the use of well-trained attendants controlling entry and exit conditions. Other safety considerations include:
slips and falls in the entry and exit areas, abrasion from the sidewalls, and impact with the shutdown lane surface.

1. Posted Signs

1.1Entry Station
Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load 1 person, 300 lbs (136 kg).

2. Person under 40 inches tall (1.02 m) are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swim wear with exposed zippers, buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back with legs firmly crossed at the ankles and arms folded across the chest (to prevent elbows contacting the flume).

8. Riders must wait for the attendants start signal before starting the ride.

9. Do not uncross your legs or attempt to sit up until you come to a stop in the shutdown lane.

10.Do not run, dive, stand, kneel, rotate or stop in the slide.

11.At the end of the slide, obey all instructions by attendant and exit quickly.

12.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

1.2Shutdown lane
Signs should be posted at the shutdown lane to convey the following rules and regulations:

1. Do not block the end of the slide.

2. Leave the shutdown lane quickly and orderly.

3. No swimming or flotation devices allowed in the shutdown lane. 162
March 13, 2017 Page 22 Project # 31548 Emerald Glen Aquatic Center

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

2.1Attendant / top - 1 attendant per slide
This requirement may be relaxed to not less than one attendant per platform area or level, provided that the operator ensures that attendants are able to fulfill all duties as listed.

Duties:

1. Ask each rider if they know how to ride the ride.

2. Assure the rider is in the correct body position when ready.

3. Control dispatch of riders one at a time and shall not dispatch a rider until the flume is clear of obstruction and any previous rider.

4. Ensure all riders meet requirements.

5. Ensure eyeglasses are securely affixed to the riders.

6. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

7. Observe riders for any physical impairments that compromise safety and do not allow them on the slide.

8. Ensure the crowd behaves in a safe and orderly manner.

9. Monitor riders in areas visible from assigned positions.

2.2Attendant / Shutdown Lane: 1 lifeguard per 2 slides
Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown lane immediately upon splashdown. Do not permit guests to sit on or congregate around shutdown lane.

4. Be prepared to enter shutdown lane to assist customer out of lane.

5. Do not allow any swimming or flotation devices in shutdown lane.

6. Monitor water level and characteristics of the shutdown lanes. Shutdown lanes require extra attention to make sure water levels are at correct operating levels and flow transition has stabilized. Too little or too much depth in the shutdown lane will affect braking distance and characteristics.

7. Signal the dispatch attendant as to when it is okay to dispatch another rider when:
i. flume and shutdown lane are clear of previous riders and, 163
March 13, 2017 Page 23 Project # 31548 Emerald Glen Aquatic Center

3. Vehicles
i. water level has recovered to marked level and,
ii. flow transition is stable between markings!
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.

4. Water Flow
Refer to attached mechanical drawing, A600, for design and commissioned water flows.

Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative. Any variations from flows after certification must be approved in writing by WhiteWater.
164
March 13, 2017 Page 24 Project # 31548 Emerald Glen Aquatic Center 32”AQUATUBE (32) into shutdown Bowl - Slide AD
The primary operating concern in the 32”Aquatube into shutdown Bowl is the possibility of one riding customer colliding with another customer, either in the flume or in the shutdown Bowl. This type of occurrence can be minimized by the use of well-trained attendants controlling entry and exit conditions. Other safety considerations include:
slips and falls in the entry and exit areas, abrasion from the sidewalls, and impact with the shutdown Bowl surface.

1. Posted Signs

1.1Entry Station
Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load 1 person, 300 lbs (136 kg).

2. Person under 48 inches tall (1.22 m) are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swim wear with exposed zippers, buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back with legs firmly crossed at the ankles and hands clasped together behind head.

8. Riders must wait for the attendants start signal before starting the ride.

9. Do not uncross your legs or attempt to sit up until you come to a stop in the shutdown lane.

10.Do not run, dive, stand, kneel, rotate or stop in the slide.

11.At the end of the slide, obey all instructions by attendant and exit quickly.

12.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

13. CAUTION: When exiting Bowl walk carefully on surface. It is slippery!

1.2Shutdown bowl
Signs should be posted at the shutdown bowl to convey the following rules and regulations:

1. Do not block the end of the slide.

2. Leave the shutdown bowl quickly and orderly.

3. No swimming or flotation devices allowed in the shutdown bowl. 165
March 13, 2017 Page 25 Project # 31548 Emerald Glen Aquatic Center

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

2.1Attendant / top - 1 attendant per slide
This requirement may be relaxed to not less than one attendant per platform area or level, provided that the operator ensures that attendants are able to fulfill all duties as listed.

Duties:

1. Ask each rider if they know how to ride the ride.

2. Assure the rider is in the correct body position when ready.

3. Control dispatch of riders one at a time and shall not dispatch a rider until the flume is clear of obstruction and any previous rider.

4. Ensure all riders meet requirements.

5. Ensure eyeglasses are securely affixed to the riders.

6. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

7. Observe riders for any physical impairment that compromise safety and do not allow them on the slide.

8. Ensure the crowd behaves in a safe and orderly manner.

9. Monitor riders in areas visible from assigned positions.

2.2Attendant / Shutdown bowl: 1 lifeguard per slide
Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown bowl immediately upon splashdown. Do not permit guests to congregate around shutdown bowl.

4. Be prepared to enter shutdown bowl to assist customers.

5. Do not allow any swimming or flotation devices in shutdown bowl.

3. Vehicles
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.
166
March 13, 2017 Page 26 Project # 31548 Emerald Glen Aquatic Center

4. Water Flow
Refer to attached mechanical drawing, A601, for design and commissioned water flows.

Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative. Any variations from flows after certification must be approved in writing by WhiteWater.
167
March 13, 2017 Page 27 Project # 31548 Emerald Glen Aquatic Center SPEED SLIDE / FREEFALL/ HIGH SPEED waterslides (32, RS, SHUT) into shutdown lane, Slide AF
The primary operating concern in the Speed Slide, Freefall and other high speed waterslides is to ensure the riders assume the correct riding position. In addition to written instructions below we recommend a pictorial representation of rider position on walkways leading to the slide, and at the top platform.

1. Posted Signs

1.1Entry Station:

Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load 1 person, 45-300 lb. (20.4-136.4 kg).

2. Persons under 48 inches (1.22 m) tall or persons greater than 76 inches (1.93 m) are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swimwear with exposed zippers; buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back with legs firmly crossed at the ankles and arms folded across the chest. Riding this slide improperly may cause injury.

8. Riders must wait for the attendants start signal before starting the ride.

9. Do not uncross your legs or attempt to sit up until you come to a stop in the shutdown lane.

10.Do not run, dive, stand, kneel, rotate or stop in the slide.

11.At the end of the slide, obey all instructions by shutdown lane attendant and exit quickly.

12.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

1.2Shutdown lane:

Signs should be posted at the shutdown lane of the ride to convey the following rules and regulations:

1. Do not block the end of the slide.
168
March 13, 2017 Page 28 Project # 31548 Emerald Glen Aquatic Center

2. Leave the shutdown lane quickly and orderly.

3. No swimming or flotation devices allowed in the shutdown lane.

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

2.1Attendant / top - 1 attendant per slide
Duties:

1. Ensure the crowd behaves in a safe and orderly manner.

2. Ensure all riders meet requirements.

3. Ensure eyeglasses are securely affixed to the riders.

4. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

5. Observe riders for any physical impairment that compromise safety and do not allow them on the slide.

6. Ensure all riders are in proper riding position before dispatching.

7. The attendant shall dispatch riders one at a time and shall not dispatch a rider until the slide landing area is clear of obstruction and any previous riders.

8. Monitor riders in areas visible from assigned positions.

2.2Attendant / shutdown lane: 1 lifeguard per two slides Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown lane immediately upon splashdown. Do not permit guests to sit on or congregate around shutdown lane.

4. Be prepared to enter shutdown lane to assist customer out of lane.

5. Do not allow any swimming or flotation devices in shutdown lane.

6. Monitor water level and characteristics of the shutdown lanes. Shutdown lanes require extra attention to make sure water levels are at correct operating levels and flow transition has stabilized. Too little or too much depth in the shutdown lane will affect braking distance and characteristics.

7. Signal the dispatch attendant as to when it is okay to dispatch another rider:
when
i. flume and shutdown lane are clear of previous riders and, ii. water level has recovered to marked level and,
iii. flow transition is stable between markings!
169
March 13, 2017 Page 29 Project # 31548 Emerald Glen Aquatic Center

3. Vehicles
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.

4. Water Flow
Refer to attached mechanical drawing, A601, for design and commissioned water flows.

Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative. Any variations from flows after certification must be approved in writing by WhiteWater.
170
March 13, 2017 Page 30 Project # 31548 Emerald Glen Aquatic Center (iii) PART III MAINTENANCE

GUIDELINES
171
March 13, 2017 Page 31 Project # 31548 Emerald Glen Aquatic Center Part III MAINTENANCE GUIDELINES FOR FRP FLUME
If properly maintained, your waterslide will give you years of service and keep sliding the way it was meant to - SAFE and FUN. By keeping the slide and its components properly maintained, you will be ensuring high performance and long life.

1. Cleaning
Maintenance requires removal of surface dirt, grease and suntan oil by cleaning the flumes with a soft-bristled brush and mild detergent such as 3M - “Multi Purpose Boat Soap”. For hard water buildup (a white chalky discoloration) removal/maintenance use “C.L.R.” or other cleaners specific for this purpose. For removal of difficult stains use a cut polish or rubbing compound and finish wax or a combination product such as 3M “Marine One-Step Fiberglass Restorer and Wax”.

2. Waxing
At least twice each year, the fiberglass finish should be waxed and buffed with high quality paste wax or polish such as 3M “Marine One-Step Fiberglass Restorer and Wax”. On scratched, dull or faded areas use a fine buffing compound to restore the original gloss before waxing. Prolonged exposure to the ultra-violet rays of the sun can in time, cause discoloring and fading. We recommend using paste waxes or polishes containing ultra-violet screens. The more often the surface is waxed, the longer it will last.

CAUTION: If you use power tools for buffing or polishing, use extreme care to prevent overheating the surface. Overheating a rubbing compound burns small gritty particles into the slide surface causing blistering and streaking. This may require the area to be sanded and repainted.

3. Joints
Slide joints play an important role in rider comfort and pleasure. Proper maintenance will keep the joints smooth and trouble free for years.

3.1Joint Caulking
All fiberglass sections will expand and contract with temperature changes.

Therefore, joints between sections are filled with a flexible, elastic caulking. Should the joints need re-caulking, all the old filler should be removed, the fiberglass should be cleaned and joints should be re-filled using a flexible polyurethane sealant. DO NOT use plastic filler that will harden. Under no circumstances should the joints be fiberglassed over. Excess joint caulking should be removed from the slide surface by scraping it off with a putty knife. Any remaining traces should be wiped off with lacquer thinner applied to a rag. Do not pour lacquer thinner directly onto a flume joint as it can dissolve the sealant.
172
March 13, 2017 Page 32 Project # 31548 Emerald Glen Aquatic Center

3.2 Joint Roughness
Joints may become rough with use, especially if metal articles are allowed down the slide. For minor chips and cracks, the joints may be fixed using the procedures outlined in Part III, Section 4.

More serious cases may require power sanding that will cut through the gelcoat.

This will require a spray application of new gelcoat by a trained person, finished by sanding and polishing and waxing as outlined in Part III.

4. Patching
Chips and cracks may appear in fiberglass flumes from normal usage. The following sections outline procedures to repair minor damage to slides. Due to the hazardous nature of materials used and variability of application methods, we recommend that a qualified fiberglass laminator perform the repairs.

4.1Minor Chips and Cracks
In areas that have chips or cracks in the gelcoat only, or have a scratch that is deep enough to penetrate through the gelcoat to the fiberglass but not deep enough to go completely through the laminate, follow the procedures given in Part III, Section 4.4.

NOTE: For damage that penetrates completely through or deep into the laminate, we recommend that a qualified fiberglass laminator perform the repairs.

4.2Surface Cracks
Hairline cracks, sometimes called spider webbing, or star cracks may develop in the gelcoat or surface coating of the fiberglass product. This is caused by a combination of weathering, vibrations, and/or impacts. Although unsightly, they do not necessarily affect structural strength. The hairline cracks can be fixed by sanding out the affected area with 100 grit sandpaper and re-coating the surface with gelcoat. Follow the patching instructions in Part III, Section 4.4.3, omitting steps 4 through 6.

4.3Cracks around Flanges
The area around the flanges of flumes contains a thick layer of gelcoat which is very stiff. Stresses from normal use may cause cracks in the gelcoat around the flanges.

These are not structural cracks. Flange cracks may be remedied by sanding the affected area with 100 grit sandpaper and re-coating with gelcoat. Follow the patching instructions in Part III, Section 4.4.3, omitting steps 4 through 6. 173
March 13, 2017 Page 33 Project # 31548 Emerald Glen Aquatic Center

4.4Repair Procedures
WARNING:

Patching kits contain toxic, combustible and corrosive elements. Use only under well ventilated conditions. Do not inhale fumes. Seek medical attention if polyester resins are swallowed or inhaled. Should contact occur with the eye flush with water for 15 minutes and seek medical attention. If person is wearing contact lenses and the lenses did not flush out from the water, have the person try to remove AFTER the flushing procedure. If contents come in contact with skin or clothing, clean the area immediately with acetone.

Before you start, you will need:
1 Sandpaper: 36 - 100 grit; 220 - 320 grit wet and dry; 600 grit wet and dry 2 Sanding block
3 Acetone
4 2" masking tape
5 Utility knife
6 Putty knife
7 Mixing board
8 Mixing cup
9 Fiberglass resin hardener (catalyst), use a peroxide based catalyst (MEKP) 10 Patching compound
11 Gelcoat paint
12 2" fine paint brush
13 Automotive cut polish
14 High quality paste wax such as "Turtle" wax

4.4.1 Storage Instructions
Store uncatalyzed patching compound and gelcoat in closed metal containers in a cool area below 73° Fahrenheit (23° Celsius) out of direct sunlight. Do not allow to freeze.

Store liquid catalysts in their original containers according to manufacturer's instructions.

4.4.2 Mixing Instructions
Mix only small amounts at one time. The mixtures will harden in twenty (20) minutes to 1 hour, depending on the temperature and the amount of catalyst added. The mixture will harden faster at higher temperatures and with increasing amounts of catalyst added. Use caution when adding catalyst, over catalyzing will result in the mixture cracking. Do not pour catalyzed mixtures back into the can. Do not reduce materials with a "conventional" paint or lacquer thinner. 174
March 13, 2017 Page 34 Project # 31548 Emerald Glen Aquatic Center Patching Compound: Add one (1) part catalyst to one hundred (100) parts patching compound on the mixing board. Mix well.

Gelcoat: Add one (1) part catalyst to one hundred (100) parts gelcoat in the mixing cup. Mix well.

4.4.3 Patching Instructions
1 Sand area to be patched with 36 -100 grit sandpaper. Feather sand to moulded surface and remove all rough edges.
2 Wash area clean with acetone and allow to dry.
3 Mask off area to be patched with 2" masking tape.
4 Using a putty knife, spread the patching compound smoothly over the prepared area to the top of the tape.

NOTE: Area must be dry and clear of contaminants, such as dirt and sanded particles, etc.
5 Keep the patched area dry and allow 20 minutes to 1 hour to harden. 6 After the patch has hardened, sand the patched area flush to the surrounding surface with 100 grit sandpaper.

NOTE: Sanding will remove the masking tape. Re-tape the area before painting.
7 Using a 2" fine paint brush, paint the area with gelcoat. Allow twenty (20) minutes to one (1) hour to dry.

NOTE: The paintbrush and tools can be cleaned with acetone. 8 After the gelcoat has dried, remove the masking tape. Using a sanding block, wet sand with 220 - 320 grit sandpaper. Repeat with 600 grit sandpaper. 9 Buff painted surface with auto cut polish and wash clean with water. 10 Wax and buff painted surface with a high quality paste wax. 175
March 13, 2017 Page 35 Project # 31548 Emerald Glen Aquatic Center (iv) PART IV

SUPPLEMENT TO MANUAL FOR ASTM STANDARDS
176
March 13, 2017 Page 36 Project # 31548 Emerald Glen Aquatic Center

PART IV SUPPLEMENT TO MANUAL FOR ASTM STANDARDS

1. The ASTM standard F 2376-XX Standard Practice for Classification, Design, Manufacture, Construction, and Operation of Water Slide Systems.

The ASTM standard F 2376 for Water Slide Systems is a standard developed specifically to cover Water Slide systems. The standard references several other standards which together form the basis of a complete standard for the Design, Manufacture, Construction and Operation of Water Slide Systems. Operators are encouraged to become active members of the ASTM F24 group. The fees are nominal and provide access to the relevant standards. Operators should be aware of these standards and the responsibilities outlined within them.

General Description of Rides
Waterslides use the flow of water to propel or lubricate the movement of riders down a fixed fiberglass flume section. The riders may ride alone with no vehicle, in groups on specially designed inflatable inner tubes or on a custom made inflatable boat or raft.

The riding configuration depends on the specific product and the method of riding.

Description of Motion
Waterslide flumes are fixed in position and do not move. Propulsion is from gravity aided by water flow in the flume. Riders with or without vehicles will experience motion and accelerations consistent with the flume path. Movements include right and left turns, vertical curves, and deceleration at the finish. Riders or vehicles shall maintain constant contact with the flume ride surface.

Operational Restrictions Due to Weather
Wind - Waterslide structures are designed to withstand wind loads specified in the building code in force for the ride locations. WhiteWater recommends suspending operation during sustained winds in excess of 40 mph (64 kph).

Lightning - Virtually all waterslides use elevated towers as starting platforms.

Operation of rides should be suspended during any storm or weather conditions where lightning may occur.

Rain - Rain will have no effect on the operation of the slides, with one exception. All flumes rely on the cushioning and braking action of the specified water flow. Rain water can create a very slippery surface and without the braking action of the larger water flow can create an extremely hazardous condition. Under no circumstances should the slides be operated without the main water supply running at specified capacity. 177
March 13, 2017 Page 37 Project # 31548 Emerald Glen Aquatic Center Safe water flow
The water flow rate is important to the safe operation of the ride. Operators shall make sure that the water supply is adequate. Insufficient water volume can result in higher speed. The water tends to restrain and cushion motions and impacts as well as reduce speed.

Evacuation and Emergency Procedures
In an emergency situation affecting the slide:
1 Top attendants shall cease dispatch of all riders.
2 If water flow is impeding the remedy of the emergency situation, use E-stop to turn off power to the pump(s).
3 Riders in the slide shall continue down the slide and exit normally if possible. 4 Attendants shall ensure all riders have exited the slide either through the bottom or at egress locations.
5 Patrons may remain queued on tower and stairs if they are not affecting the emergency situation.
6 If necessary to evacuate the tower, patrons shall be guided by top attendant to exit via the stairs from the start tower or egress location.
7 Slide should remain closed until cause of emergency situation is investigated and resolved.
8 In case of serious injuries or problems, operator should notify manufacturer and other regulatory bodies as required by law.

2. The ASTM standard F 853 - XX Standard Practice for Maintenance Procedures for Amusement Rides and Devices.

The ASTM Standard F 853 for Amusement Rides and Devices is a broad-based standard covering all the various rides and attractions encountered in the amusement industry. Most of the requirements are directed at complex mechanical devices that are subject to wear. These devices may have critical connectors and linkages that must be inspected regularly to avoid catastrophic failure. Waterslides in general are quite simple. The following is WhiteWater’s requirement for inspection of waterslides to conform to ASTM. These are to be used in conjunction with WhiteWater’s Operation & Maintenance Manual.

Operational Tests of Critical Operating Items
Waterslides use water pumped into the starting area of the ride to operate. The water volume is important to safe operation of the ride. In general, the less water volume pumped, the faster the rider will travel. If during operation, the water supply is restricted or fails, operators shall suspend operations when water volume is below specified operating requirements. A basic operational test should be performed daily in accordance with the Waterslides Operations & Maintenance Manual. 178
March 13, 2017 Page 38 Project # 31548 Emerald Glen Aquatic Center Inspection of the fiberglass and sliding surface must be made daily in accordance with the Waterslides Operations & Maintenance Manual. Small chips or surface imperfections may cause injury to riders.

Recommended Maintenance/Inspection
The daily inspection of the slides is detailed in the Waterslides Operations & Maintenance Manual Part I - Section 3 and Part III - Section 1, which covers the operational components of the slide. The only other items that should be inspected are the supporting structures for the slides and start platforms.

Inspection of supporting structures:
• Steel structures that are hot dipped galvanized will require visual inspections on a semiannual basis. Areas around field welds should be carefully checked and touched up with zinc rich paint as necessary. If rust streaking occurs, the source should be identified and attended to. If steel structures are ten years old or greater, a comprehensive professional inspection should be performed.
• Steel structures that are painted without galvanizing should be visually inspected on an annual basis. If steel structures are five years old or greater, a comprehensive professional inspection should be performed.
• Wood structures should be visually inspected annually for integrity, tightness of fasteners and general condition. If wood structures are over five years old, a comprehensive professional inspection should be performed.

Climactic and operation conditions vary greatly and will affect the interval times above.

In more corrosive environments such as seaside or some indoor installations, the interval times should be reduced.

Other routine checks completed annually:
• All concrete filled stairs and decks should be visually inspected for worn finishes on the nosing and cracked concrete. The underside of the metal decking should be checked for deterioration.
• All welds should be visually inspected for condition and all bolts should be snug. • Anchor bolts should be checked for tightness and corrosion. Grout around base plates should be in good condition.
• Inspection and maintenance of fiberglass should be performed as per the WhiteWater Operations & Maintenance Manual Part III.

Comprehensive professional inspections should be performed by a qualified engineering or inspection firm. They perform inspections with methods they deem appropriate to assure accurate review of the structure. These methods may include non-destructive testing using ultrasound or other techniques. Inspection would include condition of metal components, welds, bolts, and any other critical items. The inspecting agency should produce a certificate of inspection and/or a report on condition for review by a qualified engineer.
179
March 13, 2017 Page 39 Project # 31548 Emerald Glen Aquatic Center Fiberglass Wear Limits
The fiberglass should be inspected regularly as per the WhiteWater Operations & Maintenance Manual Part I - Section 3 and Part III - Section 1. The riding surface of the flume is subject to wear and weathering. The exterior of the slide is subject to weathering. The fiberglass should be inspected professionally if five years old or older.

Other Wear Limits
Rides using boats will experience wear on the boats. If the wear is excessive it may impair the function of the boat and operation of the ride. This is especially true if the ride uses shutdown lanes. The wear should be checked in accordance with the boat manufacturer’s recommendations.

Replacement Fasteners
All replacement fasteners shall conform to the standards specified in the engineering drawings.

Electrical / Mechanical Systems Operation and Maintenance All electrical motors, pumps, controls etc. shall be inspected and maintained in accordance with their manufacturer's recommendations.

All pump intake grating or screens must be inspected to ensure that no structural flaw is evident.

Note: Whenever inspection or maintenance work is being done on electrical/mechanical systems, including pump intake grating, all related equipment must be electrically isolated using recognized equipment lock out procedures. 180
March 13, 2017 Page 40 Project # 31548 Emerald Glen Aquatic Center Appendix 1-I

TYPICAL DAILY WATER QUALITY LOG

WATER TEST FILTER CHECK
Time Chlorine Count pH Water Clarity Backwash Temperature Initial 10:
11:
12:
13:
14:
15:
16:
17:
18:
19:
20:
21:
22:
23:
24:

Location: Date:

Weather:
181
March 13, 2017 Page 41 Project # 31548 Emerald Glen Aquatic Center Appendix 1-II

TYPICAL FIRST AID REPORT
First Name of Victim: Middle
Initial:

Name of Person Filling Report:

Last Name: Location Address:

Mailing Address: City: State/Province:

City: State/Province: Zip/Postal Code: Location Phone #:

Zip/Postal Code: Phone #: Location Name:

Date (MM/DD/YY) and Time of injury (month) (day) 20 , at a.m. / p.m.

Date and Time Injury Reported to First Aid
Attendant
(month) (day) 20 , at a.m. / p.m.

Location of Accident:

What Happened – Victim Statement:

Name of Witness:

Witness Mailing Address:

City: State/Province: Postal Code:

What Happened – Witness Statement:

First Aid Attendant Description of Injury:

Was an Ambulance called (circle) Yes / No Manager on Duty:

Manager Statement:

I hereby certify that the above statement is true to the best of my knowledge.

Victim Signature Witness Signature First Aid Attendant Signature Manager on Duty Signature 182
March 13, 2017 Page 42 Project # 31548 Emerald Glen Aquatic Center Appendix 1-III

EMERGENCY PHONE NUMBERS
Location Name: Location Phone:

Location
Address:

DIAL 911 for Police, or Medical Emergency (if available in your area)

EMERGENCY SERVICES
Police: Sheriff:

Hwy Patrol: Ambulance:

PLUMBER VENDING MACHINE COMPANY
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

GENERAL CONTRACTOR WATERSLIDE MANUFACTURER
Company Name: Company Name: WhiteWater West Industries Ltd.

Contact Name and
Phone:

Contact Name and
Phone:
604-273-1068
Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

ELECTRICIAN
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

SWIMMING POOL SUPPLY
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:
183
March 13, 2017 Page 43 Project # 31548 Emerald Glen Aquatic Center ADDENDUM: SHUTDOWN LANE FLOW TRANSITION DATA RECORDING

SHEET, FREE FALL, SLIDE AF
184

FLOW RATE

DIMENSION-A
(SPECIFY UNITS)

DIMENSION-B
(SPECIFY UNITS)

DIMENSION-C
(SPECIFY UNITS)

FINAL MEASUREMENTS
240 20 GPM
6 IN
78 FT.
2 IN

DIMENSION B

CAUTION - HYDRAULIC LOCATION IS FOR
REPRESENTATION PURPOSES ONLY. FINAL

HYDRAULIC LOCATION TO BE DETERMINED
DURING COMMISSIONING.

G
1121
3000
TYP (x8)

OPERATING WATER DEPTH MEASUREMENT LOCATIONS H
1500
TYP (x2)

DIMENSION C IS THE MINIMUM DISTANCE

FROM THE HYDRAULIC TRANSITION WHERE AN
ACCURATE READING CAN BE TAKEN.

DETAIL
G

MEASURE
1'-0"
300

AWAY FROM JOINT
DETAIL
H
NOTE:-

METRICMM
IMPERIAL [IN]

METRIC DIMENSIONS

PROJECT NAME EMERALD GLEN AQUATIC CENTER

WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond, B.C. Canada V6W 1J7

PROJECT NUMBER

SLIDE NUMBER

CERTIFIER
31548
AF
ANDY

MULLIGA
N

DIMENSION A
(WATER DEPTH)

DIMENSION C
(WATER DEPTH)
A UPDATED WITH FINAL MEASUREMENTS MAR 20 2018 RS
0 RELEASED JUN 06 2017 CB

REV REVISION DESCRIPTION/ISSUE RECORD DATE PE

DESIGNED BY
CB
DATE
JUN 05 2017
PROJ. ENG. CHECK
CB
DATE
JUN 06 2017

DRAWN BY
SJ
DATE
JUN 06 2017

DRAFTING CHECK
CB
DATE
JUN 06 2017
SCALE
1:60

ARCHIVE
FILE No.
185
Tel (604) 273
-1068 Fax (604) 273-4518
CERTIFIER DATE 12
-MAR-2018
PROJECT No.
31548
DRAWING No.
31548-AF-S1270

REVISION
A

SHUTDOWN LANE FLOW TRANSITION

DATA RECORDING SHEET

EMERALD GLEN AQUATIC CENTER
FILE : C:\Slides1\Projects\31548 Emerald Glen Aquatic Center\Documents\Shutdown Lane Drawings\31548-AF-S1270-SHUTDOWN-LANE-FLOW-TRANSITIONLAST SAVED BY : rick.sebulsky , ON Tuesday, March 20, 2018 1:57:39 PM ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF WHITEWATER AND SHALL NOT BE REPRODUCED OR USED ON ANY OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH WHITEWATER 186
ADDENDUM: PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF

WATERSLIDE
March 13, 2017 Page 44 Project # 31548 Emerald Glen Aquatic Center 187

PROCEDURE
PROJECT NO.
-
DOCUMENT NO.
428676

REVISION
X3

CREATED BY
R.S.

DATE
2017-07-06

APPROVED BY
C.B.

DATE
2018-03-05
TITLE

PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF WATERSLIDE
(v) OBJECTIVE
The objective of this procedure isto outline the procedure for the Owner/Operator to perform annual operational testing on their slide to ensure that it’s operating within its prescribed operational limits. (vi) SCOPE
The scope of this document is limited to high speed body slides with shutdown lanes. (vii) PROCEDURE FOR OPERATIONAL TESTING
This section will outline the procedure for the Owner/Operator to perform annual operational testing on their slide to ensure that it’s operating within its prescribed operational limits set during commissioning.

1. Inspect the slide surface and joints for defects such as chips and cracks. Perform remedial work as necessary.

2. To ensure optimal slide performance, the slide surface must be clean and free of scale and residue.

Clean and wax the slide surface, per the O&M, if the slide surface is compromised.

3. Turn on the slide pumps. Ensure valve lockout tags installed during commissioning are still in place and haven’t been tampered with. Verify that all flow meters are functional and reading within the prescribed range documented within the completed “shutdown lane flow transition data recording sheet” for the given slide.

4. Inspect the shutdown lane settings. Ensure that the flow transition is approximately centered within the flow transition markers, and that the water depth at the end of the shutdown lane is at the height of the depth marker set during commissioning. Refer to the completed “shutdown lane flow transition data recording sheet” for commissioning settings.

5. Document all slide settings; including slide surface quality, flow rate, location of flow transition, weir height, and depth of water in the shutdown lane.
(viii) REFERENCE
Refer to the “shutdown lane flow transition data recording sheet” completed for the given slide during commissioning. This sheet provides the final, commissioned flow, depth and transition location measurements.

WHITEWATER WEST INDUSTRIES LTD.

Richmond, BC Canada
6700 McMillan Way
V6W 1J7
Ph.

Fax.

Web.
(604) 273-1068
(604) 273-4518
www.whitewaterwest.com

Page 1 of 1 ends

188
189
Waterslides Operations & Maintenance Manual
Prepared for:

Emerald Glen Aquatic Center – Slide AE (AquaDrop Slide) Dublin, CA
Project No. 31548
Date: April 26, 2018
Reviewed and submitted by:

Claudio Barrera, P.Eng Eric Sinclair
Project Manager
190
April 7, 2016 Page 2 Project # 31548 – Emerald Glen Aquatic Center

LOCATION DRAWINGS
Table of Contents
Group A Slide Path Layout – Emerald Glen Aquatic Center – Dublin, CA Project No. 31548 Drawing No. A200 Engineering Issued Dated December 1, 2015 Shutdown Lane Marking Procedure – Emerald Glen Aquatic Center – Dublin, CA Project No. 31548 Drawing No. S290 Engineering Issued Dated December 1, 2015 Part I GENERAL OPERATING GUIDELINES ................................................................. 5

1. Customers..............................................................................................................................5

1.1 Posted Signs...................................................................................................................5

1.2 Access............................................................................................................................5

1.3 Physical Condition.........................................................................................................5

1.4 Visitors and Spectators ..................................................................................................6

1.5 Food and Drinks.............................................................................................................6

2. Attendants..............................................................................................................................6

2.1 Top of Slides..................................................................................................................6

2.2 Splash Pool.....................................................................................................................6

2.3 Runout Lane...................................................................................................................7

2.4 Water Treatment ............................................................................................................7

2.5 Pool Operations..............................................................................................................7

3. Inspections.............................................................................................................................7

3.1 Slide Inspections............................................................................................................7

3.2 Mechanical Inspections..................................................................................................8

3.3 Chemical Inspections.....................................................................................................8

4. Accidents...............................................................................................................................8

4.1 Incident Reporting .........................................................................................................9

4.2 Floatation Devices .........................................................................................................9

4.3 Slips and Falls................................................................................................................9

4.4 Bodily Collisions ...........................................................................................................9

4.5 Chemical Hazards........................................................................................................10

5. Emergency Procedures........................................................................................................10

6. Operator’s Changes.............................................................................................................11 Part II SPECIFIC OPERATING GUIDELINES............................................................... 13 AQUADROP SLIDE waterslides (32) into shutdown lane – Slide AE.......................... 13

1. Posted Signs........................................................................................................................13

1.1 Entry Station ................................................................................................................13

1.2 Shutdown lane..............................................................................................................13

2. Attendants............................................................................................................................14

2.1 Attendant / top - 1 attendant per slide..........................................................................14

2.2 Attendant / shutdown lane: 1 lifeguard per two slides.................................................14 191
April 7, 2016 Page 3 Project # 31548 – Emerald Glen Aquatic Center

3. Vehicles..............................................................................................................................15

4. Water Flow.........................................................................................................................15 Part III MAINTENANCE GUIDELINES FOR FRP FLUME............................................. 17

1. Cleaning .............................................................................................................................17

2. Waxing ...............................................................................................................................17

3. Joints ..................................................................................................................................17

3.1 Joint Caulking .............................................................................................................17

3.2 Joint Roughness..........................................................................................................18

4. Patching..............................................................................................................................18

4.1 Minor Chips and Cracks .............................................................................................18

4.2 Surface Cracks............................................................................................................18

4.3 Cracks around Flanges................................................................................................18

4.4 Repair Procedures.......................................................................................................19

4.4.1 Storage Instructions.................................................................................................19

4.4.2 Mixing Instructions .................................................................................................19

4.4.3 Patching Instructions...............................................................................................20 PART IV SUPPLEMENT TO MANUAL FOR ASTM STANDARDS ............................... 22

1. The ASTM standard F 2376-XX Standard Practice for Classification, Design, Manufacture, Construction, and Operation of Water Slide Systems................................22

2. The ASTM standard F 853 - XX Standard Practice for Maintenance Procedures for Amusement Rides and Devices.........................................................................................23 Appendix 1-I .................................................................................................................. 26 Appendix 1-II ................................................................................................................. 27 Appendix 1-III ................................................................................................................ 28

PART V AQUADROP OPERATIONS MANUAL

PART VI AQUADROP MAINTENANCE MANUAL
ADDENDUM: SHUTDOWN LANE FLOW TRANSITION DATA RECORDING SHEET,

AQUADROP, SLIDE AE
ADDENDUM: PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF

WATERSLIDE
ADDENDUM: MECHANICAL DRAWINGS
192
LEGEND:
•
(..._;- \ 0

INDICATES YOKE LOCATION

INDICATES COLUMN LOCATION
i
[ ]
NOTES:

1. FOR GENERAL NOTES AND SPECIFICATIONS SEE DWG 130.
1 T.O. DECK O SLIDE AA. AB & AC
_ -. 371.920'
LAYOUT AND DET,'JIS 0
SEE DWG. A340
I II
II
Ye•
...,0( FLUME INV. AD1
4@
Xe :1
C
1J\"r
M(3)
M(4)
M(5)
A(14)
AB(3)
- --
(4)
AB(5) \3)A
AC(3)
0 AC(4)
AC(5)
1 P60
0 0 ,
•
P50
6 P52
A0(3)
M(11),
I@) A(7)
AA(20)
•
0 ISSUED FOR CONSTRUCTION

REVISED AS NOTED

REVISED AS NOTED

REVISED AS NOTED
'

REVISED AS NOTED

ISSUED FOR INFORMATION
DEC 01/2015
OCT 19/2015
SEP 3012015
SEP 2512015
SEP 1412015
AUG 2012015
REV
'-

REVISION DESCRIPTION/ISSUE RECORD DATE
loESIGNEO BY
RP

DRAWN BY
KS
SCALE
'-
DATE
DATE
AUG 20/2015
AUG 20/2015
PROJ. ENG. CHECK

DRAFTING CHECK

ARCHIVE
FILE No
DATE
DATE
31548A200
J
NOTE:- IMPERIAL DIMENSIONS

ALL ELEVATIONS AND CO-ORDINATES ARE IN FEET

ALL OTHER DIMENSIONS ARE IN FEET AND INCHES
r

WHITE WATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond, B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax. (604) 273-4518

SLIDE PATH LAYOUT
SCALE 1/8"=1'-o•
'
r
-
J

GROUP A
'

SLIDE PATH LAYOUT

EMERALD GLEN AQUATIC CENTER

DUBLIN, CALIFORNIA, UNITED STATES
J
\
MAINTAIN MARKINGS AND WATER LEVELS AS PER DRAWING S290
193
NOTE:

AFTER CERTIFICATION
MEASURE "A" & "B" AND

PROVIDE MARKERS FOR

ALL TYPES OF SHUTDOWN LANE
AS SHOWN IN DETAIL 2 & 3.

PROVIDE PERMANENT MARKER

INDICATING OPERATIONAL WATER
DEPTH
SEE DETAIL2
NOTE:

1. FOR GENERAL NOTES AND SPECIFICATIONS SEE DWG 130.

2. SLIDE OUTLINE MAY NOT BE EXACTLY AS SHOWN.

PROVIDE PERMANENT
B MARKER INDICATING .

FLOW TRANSITION LOCATION
SEE DETAIL 3
A
3'-0' (900mm)

FLOW TRANSITION

LOCATION

ELEVATION- SHUTDOWN LANE
PROVIDE 1"(25mm) THICK

WATERPROOF ADHESIVE TAPE

OF CONTRASTING COLOUR ON

EACH SIDE OF FLOW

TRANSITION LOCATION
2 . . .

DETAIL3
SCALE1 : 10
FLOW TRANSITION LOCATION . 0 ISSUED FOR INFORMATION APR 26/2013 NK REV
3 DESIGNED BY

REVISION DESCRIPTION/ISSUE RECORD
DATE PROJ. ENG. CHECK DATE
DATE PE .

DETAIL2
N.Kamarzina

DRAWN BY
N.Kamarzina
SCALE
DATE
1:100
APR 26 2013
APR 26 2013
-

DRAFTING CHECK -

ARCHIVE
FILE No.

DATE
-
APR 26 2013
APR 26 2013
NOTE:- METRIC DIMENSIONS
SCALE1 : 10

WATER DEPTH MARKER

ALL ELEVATIONS AND CO-ORDINATES ARE INMETERS

ALL OTHER DIMENSIONS ARE IN MILLIMETERS WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond, B.C. Canada V6W 1J7
Tel (604) 273-1068 Fax (604) 273-4518

SHUTDOWN LANE

MARKING PROCEDURE ---
PROJECT No.
-
DRAWING No.

S290

REVISION

0.00 FILE : C:\Slides1\Rides\xxx-Shutdown Lane Solutions\SS-Profile_32AT-Freefall_14599-Mansfield\S290_1 LAST SAVED BY : natalie.kamarzina , ON Monday, April 29, 2013 3:24:20 PM ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF WHITEWATER AND SHALL NOT BE REPRODUCED OR USED ON ANY OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH WHITEWATER 194
April 7, 2016 Page 4 Project # 31548 – Emerald Glen Aquatic Center PART I

GENERAL OPERATING GUIDELINES
195
April 7, 2016 Page 5 Project # 31548 – Emerald Glen Aquatic Center Part I GENERAL OPERATING GUIDELINES
Important Notice
The following operating procedures are presented to waterslide owners as guidelines only. They are not intended to be mandatory or exhaustive. These guidelines do not replace proper consultation with designers, manufacturers and legal counsel, and compliance with local, state (provincial) and federal laws and regulations involving, but not limited to: health, safety and building codes.

General Operating Considerations

1. Customers
While customers are the key ingredients to the success of any waterpark, certain rules and procedures must be made clear for the park to function efficiently and safely.

1.1 Posted Signs
A sign must be posted at the entrance to the waterpark that states user responsibility and conveys the following rules and regulations:
1 Read and obey all posted signs.
2 Obey all instructions given by the attendants and operators. 3 No glass, cigarettes and/or food are permitted in the water slide area. 4 Anyone under the influence of alcohol or drugs will not be permitted in the park. 5 Pregnant women and those with a history of heart problems or back trouble should not use the slides.
6 Failure to follow rules and instructions can lead to serious injuries. 7 Ride at your own risk.

Note: Specific sign requirements for each waterslide are detailed in Part II - Specific Operating Guidelines.

1.2 Access
Provisions must be made to prevent customers from entering the water slide at any points other than at the designated entry access points.

1.3 Physical Condition
Waterslide customers must be checked for proper swimwear and adequate physical condition. Swim attire should not have any metal parts that could damage the slides or cause injuries. Customers who show signs of drug and/or alcohol impairment will not be permitted on the site.
196
April 7, 2016 Page 6 Project # 31548 – Emerald Glen Aquatic Center

1.4 Visitors and Spectators
Visitors and spectators should be physically separated from the areas used by sliders. They should be kept a safe distance away from any wet areas and not be permitted to interfere with the sliders.

1.5 Food and Drinks
No food or drinks are allowed in the immediate area of flumes and pools or on decks, stairs and walkways surrounding flumes and pools. Food and beverages should be confined to visitor and spectator areas or similarly marked areas for sliders. Trash containers should be provided to keep litter off decks and walkways and out of flumes and pools.

2. Attendants
Waterpark attendants are responsible for safe and orderly conduct of customers, safe entry and exit of riders from the slides, general crowd control and emergency procedures.

During operating hours, there must be at least one attendant on duty at all times who has completed a Red Cross or equivalent Standard First Aid and Safety course. This person must also be competent in carrying out any emergency procedures specific to the slide he or she is operating.

Every water slide should be equipped with a battery or electronically operated system to provide voice communication between attendants at different locations on the slides and park office or permanently manned control center.

2.1 Top of Slides
The area at the top of every water slide must be supervised by at least one attendant who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner. • Ensuring that customers enter slides or rafts/mats properly. • Ensuring that customers are dispatched at safe intervals. • Visually surveying all areas of the water slide that are visible from attendant’s position, with the exception of the splash pool, and communicating any problems to the other attendants.
• Ensuring that customers meet the minimum and/or maximum restrictions for the slide.
• Ensuring that any vehicles used are in good condition and if inflated, inflated properly.

2.2 Splash Pool
The recommended depth for the splash pool is 3.5 feet (1.07 metres) except otherwise noted in special conditions and therefore must be supervised by at least 197
April 7, 2016 Page 7 Project # 31548 – Emerald Glen Aquatic Center one certified lifeguard who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner. • Ensuring that customers move into and out of splash pool in a quick and orderly manner.
• Controlling running, horseplay or other unsafe behavior on pool decks. • Ensuring pool water levels are correct.

2.3 Runout Lane
The runout lanes of waterslides must be supervised by at least one attendant who has continuous and direct supervision of that area and is responsible for:
• Ensuring that customers conduct themselves in a safe and orderly manner. • Ensuring that customers exit runout lane in a quick and orderly manner. • Controlling running, horseplay or other unsafe behavior on slide apron. • Ensuring water levels are at level marks and flow transition is within indicator markings.

2.4 Water Treatment
A specific person on each shift should be responsible for chlorination and water treatment procedures. They should be thoroughly trained in all aspects including, routine operations, handling, connection, disconnection, emergency procedures and leak control procedures. A safety chart should be posted in or near the chlorination room and a second safety chart should be placed in the pool office near the telephone. Emergency telephone numbers should also be shown on the safety charts.

2.5 Pool Operations
A specific person on each shift should be made responsible for all swimming pool operations, such as: circulation and filtering system operation, maintenance, inspections, backwashing and cleaning. They should be thoroughly trained by an expert in swimming pool operations.

3. Inspections
Permanently bound log books should be kept to record all inspections, operational tests, water quality monitoring, all accidents and unusual occurrences. Log books should be kept for a period of at least six (6) years from the date of the last entry. Log book entries that cover the twelve (12) month period previous to the last entry in the log book should be kept readily available.

3.1 Slide Inspections
Daily inspections must be made to check for:
• obstructions in slide paths
198
April 7, 2016 Page 8 Project # 31548 – Emerald Glen Aquatic Center • cracks, chips or bubbles in sliding surfaces
• rough patchwork at joints or cracks
• caulking protruding from joined flanges
• leaking seals at joints
• loose risers on turns
• excessive movement of flumes when walked on
• joints opening up
• proper inflation and condition of rafts, tubes and vehicles • landing or pool bottom padding, if used, is in good condition and properly secured.

3.2 Mechanical Inspections
Daily inspections must be completed on each waterslide:
• before water is circulated to ensure no safety hazards exist • with the water circulating to ensure there is sufficient water flowing in the channel and correct water level is in splash pool or runout lane • to ensure that all the pumping and filtration equipment is operating correctly • to ensure that conveyor system is operating properly and poses no hazard It is the attendant's responsibility to ensure water flow is maintained in accordance with manufacturers’ guidelines. Serious hazards may develop when flow is interrupted in a flume.

3.3 Chemical Inspections
Proper water chemical balance must be obtained each day before the facility is opened to the public. While the facility is operational, water quality testing should be performed at intervals in accordance with local health authority’s guidelines.

Inspections should also be made during periods of heavy usage to ensure circulation and filtration systems are handling peak loads. The attendant must keep logs of all water testings performed. A typical form for water quality testing is shown in Appendix 1-I.

The attendant must ensure that customers cannot come in contact with water treatment, re-circulation and filtration equipment. Mechanical and chemical storage rooms must be locked at all times to prevent customer access.

4. Accidents
The most common accidents in waterparks are: slips and falls, collisions between one riding customer and another customer, impact with the pool surface, and abrasions from sidewalls. Operators should keep detailed logs of all reported accidents onsite. A typical accident report form is included in Appendix 1-II. 199
April 7, 2016 Page 9 Project # 31548 – Emerald Glen Aquatic Center

4.1 Incident Reporting
The owner or operator shall notify the manufacturer (Whitewater West Industries Ltd.) of any known serious incidents that require immediate hospital admission.

Minor injuries that may or may not require treatment shall be reported to the manufacturer if deemed to be related to the equipment design or function.

There may be local jurisdiction and laws requiring notification of incidents. The owner or operator may be required to notify these local jurisdictions in addition to the above.

4.2 Floatation Devices
The operator should not infer that rafts, tubes or any other floatation device, with exception of government approved life jackets, offer the user any safety benefit.

Where unapproved floatation devices are provided, signs should be posted stating they are for pleasure only and should not be used as a substitute for approved floatation devices.

4.3 Slips and Falls
Slips and falls are a constant concern in all areas of the waterpark. All surfaces intended for pedestrian traffic, whether in the water, on walkways, on loading platforms or on stairs should be made and maintained slip-resistant. Proper periodic maintenance of walking surfaces should be carried out to remove the growth of algae and fungi which could inhibit the surfaces intended function. Adequate drainage should be maintained around all areas of the slides.

The entry section to flumes should be given particular attention with respect to slips and falls. The combination of the flowing water and the customer contacting water on a slippery surface for the first time can be confusing and disorienting. The exit area of the splashdown pool will always be wet and flowing with water which requires special attention with respect to slip-resistant surfaces, drainage and number and location of attendants.

To minimize slip and fall type accidents, attendants throughout the waterpark should control running and horseplay.

4.4 Bodily Collisions
Bodily collisions occur in flumes and splash pools as a result of riders traveling at different speeds and riders slowing or stopping in the flume. Restricting traffic flow with proper dispatching intervals can minimize these bodily collisions. The top attendant and lower attendant must have a view of much of the slide and a means of communication between them. The entry attendant must be alert and aware that people will travel at different rates due to variations in body weight, body friction, and rider position. Generally, the heavier the person, the faster the rider will travel.

Slippery materials like nylon slide much faster than cotton clothing. All other factors being equal, riders in a sitting position will travel slower than a person lying flat on their back. Under no circumstances should customers be permitted to ride flumes in 200
April 7, 2016 Page 10 Project # 31548 – Emerald Glen Aquatic Center a standing position. Similarly, running or leaping entry into flumes is not to be permitted.

In addition to slide entry attendants, use of signal lights or electro-mechanical starting gates should be considered for rider entry control.

As bodily collisions in splash pool area cannot be fully controlled even with proper entry rates; splash pool attendants should be well trained, attentive and aggressive, continuously urging and encouraging customers to leave the flume discharge and splash pool area as quickly as possible. They must be alert to the possibility of problems and be prepared to enter the water at any time to assist a customer. In the event of a delay at discharge, following riders should be stopped at the entry. Riders tend to congregate in the pool because they are temporarily confused and disoriented upon impact with the water, to wait for their friends who are coming behind, or to socialize with persons in the splash pool. Collisions also result from multiple rider entry (i.e. trains). This practice is absolutely prohibited even for small children being carried on their parent's legs.

If marker buoys or lane ropes are used in the splash pool, they must be arranged so they do not become obstacles for riders. Such devices, if used, should float and be simple in design to avoid the possibility of entangling riders.

4.5 Chemical Hazards
Personnel must be fully trained in the use of water chemicals. Potentially fatal accidents could result from the release of gaseous chlorine. Improper chemical control could result in skin and eye irritation from excessive treatment. Bacterial problems could also arise from inadequate treatment.

5. Emergency Procedures
Every park must have an emergency plan with specific procedures covering:
• crowd control
• park evacuation
• drowning
• heart attacks
• cuts and burns
• neck and spinal injuries
• power or other utility failures
• fires
• security (fights, robbery, vandalism)
• exposure to chlorine
• environmental conditions (e.g., lightning, windstorms, hail, earthquakes) An emergency plan should address those factors which affect, human safety, protection and correction of equipment, and customer relations. All employees should be trained and drilled periodically in the execution of the emergency plan. The emergency plan 201
April 7, 2016 Page 11 Project # 31548 – Emerald Glen Aquatic Center should be easily accessible and be located with first aid equipment and emergency telephone numbers.

Each facility should have a list of current emergency numbers posted by a telephone.

The list should include the contact information for the nearest available doctor, ambulance service, hospital, rescue service, police department, fire department and poison control center. A typical emergency telephone list is shown in Appendix 1-III.

Each facility should have available the following first aid supplies:
• A standard 24-unit first aid kit stocked and readily accessible for use. • A stretcher and blankets.
• A standard plywood backboard or other acceptable splint for persons with back and neck injuries.
• An area or room set aside for the emergency care of injuries.

6. Operator’s Changes
WhiteWater should be advised of any changes made in slides, structures or equipment, manufactured, designed or installed by WhiteWater West Industries Ltd. Changes could affect the safety of the attraction.
202
April 7, 2016 Page 12 Project # 31548 – Emerald Glen Aquatic Center

PART II

SPECIFIC OPERATING GUIDELINES
203
April 7, 2016 Page 13 Project # 31548 – Emerald Glen Aquatic Center Part II SPECIFIC OPERATING GUIDELINES
AQUADROP SLIDE waterslides (32) into shutdown lane – Slide AE The primary operating concern in the AquaDrop is to ensure the riders assume the correct riding position. In addition to written instructions below we recommend a pictorial representation of rider position on walkways leading to the slide, and at the top platform.

1. Posted Signs

1.1Entry Station:

Signs should be posted at the entry station of the ride to convey the following rules and regulations:

1. Maximum operational load 1 person, 45-300 lb. (20.4-136.4 kg).

2. Persons under 48 inches (1.22 m) tall or persons greater than 76 inches (1.93 m) are not permitted on this ride.

3. Eyeglasses must be securely affixed to riders with head straps.

4. Swimwear with exposed zippers; buckles, rivets or metal ornamentation are not permitted.

5. Only one rider to enter the flume at a time. Single Riders only!

6. Never form chains.

7. Slide must be ridden feet first lying on your back with legs firmly crossed at the ankles and arms folded across the chest. Riding this slide improperly may cause injury.

8. Do not uncross your legs or attempt to sit up until you come to a stop in the shutdown lane.

9. Do not run, dive, stand, kneel, rotate or stop in the slide.

10.At the end of the slide, obey all instructions by shutdown lane attendant and exit quickly.

11.CAUTION: For safety reasons, pregnant women and persons with heart conditions or back trouble should not ride this slide.

1.2Shutdown lane:

Signs should be posted at the shutdown lane of the ride to convey the following rules and regulations:

1. Do not block the end of the slide.

2. Leave the shutdown lane quickly and orderly.

3. No swimming or flotation devices allowed in the shutdown lane. 204
April 7, 2016 Page 14 Project # 31548 – Emerald Glen Aquatic Center

2. Attendants
Attendants should be alert to controlling crowd behavior, ensuring safe and orderly entry and exit and controlling the proper entry rate into the slide.

FURTHER INSTRUCTIONS FOR THE LAUNCH MECHANISM AND AQUADROP RIDE ARE CONTAINED IN OTHER SECTIONS OF THIS MANUAL. OPERATORS MUST BE TRAINED AND FAMILIAR WITH THESE SECTIONS.

2.1Attendant / top - 1 attendant per slide
Duties:

1. Ensure the crowd behaves in a safe and orderly manner.

2. Ensure all riders meet requirements.

3. Ensure eyeglasses are securely affixed to the riders.

4. Observe bathing suits for zippers, buckles, rivets, etc. and do not allow them on the slide.

5. Observe riders for any physical impairment that compromise safety and do not allow them on the slide.

6. Ensure all riders are in proper riding position before dispatching.

7. The attendant shall dispatch riders one at a time and shall not dispatch a rider until the slide landing area is clear of obstruction and any previous riders, and signal from attendant at shutdown lane that it is OK to dispatch.

8. Monitor riders in areas visible from assigned positions.

2.2Attendant / shutdown lane: 1 lifeguard per two slides Duties:

1. Ensure customers conduct themselves in a safe and orderly fashion.

2. Do not allow riders to block the end of a slide. Delay dispatch of next rider if the slide landing area is obstructed.

3. Ensure that all riders exit the shutdown lane immediately upon splashdown. Do not permit guests to sit on or congregate around shutdown lane.

4. Be prepared to enter shutdown lane to assist customer out of lane.

5. Do not allow any swimming or flotation devices in shutdown lane.

6. Monitor water level and characteristics of the shutdown lanes. Shutdown lanes require extra attention to make sure water levels are at correct operating levels and flow transition has stabilized. Too little or too much depth in the shutdown lane will affect braking distance and characteristics.

7. Signal the dispatch attendant as to when it is okay to dispatch another rider when:
i. flume and shutdown lane are clear of previous riders and, 205
April 7, 2016 Page 15 Project # 31548 – Emerald Glen Aquatic Center

3. Vehicles
i. water level has recovered to marked level and,
ii. flow transition is stable between markings!
No vehicles are used in this slide. Patrons ride the slide in bathing suit attire according to instructions above.

4. Water Flow
Refer to attached mechanical drawing for design water flows. Specific operational water flow values are determined at the time of commissioning by a WhiteWater representative.

Any variations from flows after certification must be approved in writing by WhiteWater. 206
April 7, 2016 Page 16 Project # 31548 – Emerald Glen Aquatic Center

PART III

MAINTENANCE GUIDELINES
207
April 7, 2016 Page 17 Project # 31548 – Emerald Glen Aquatic Center Part III MAINTENANCE GUIDELINES FOR FRP FLUME
If properly maintained, your waterslide will give you years of service and keep sliding the way it was meant to - SAFE and FUN. By keeping the slide and its components properly maintained, you will be ensuring high performance and long life.

1. Cleaning
Maintenance requires removal of surface dirt, grease and suntan oil by cleaning the flumes with a soft-bristled brush and mild detergent such as 3M - “Multi Purpose Boat Soap”. For hard water buildup (a white chalky discoloration) removal/maintenance use “C.L.R.” or other cleaners specific for this purpose. For removal of difficult stains use a cut polish or rubbing compound and finish wax or a combination product such as 3M “Marine One-Step Fiberglass Restorer and Wax”.

2. Waxing
At least twice each year, the fiberglass finish should be waxed and buffed with high quality paste wax or polish such as 3M “Marine One-Step Fiberglass Restorer and Wax”. On scratched, dull or faded areas use a fine buffing compound to restore the original gloss before waxing. Prolonged exposure to the ultra-violet rays of the sun can in time, cause discoloring and fading. We recommend using paste waxes or polishes containing ultra-violet screens. The more often the surface is waxed, the longer it will last.

CAUTION: If you use power tools for buffing or polishing, use extreme care to prevent overheating the surface. Overheating a rubbing compound burns small gritty particles into the slide surface causing blistering and streaking. This may require the area to be sanded and repainted.

3. Joints
Slide joints play an important role in rider comfort and pleasure. Proper maintenance will keep the joints smooth and trouble free for years.

3.1Joint Caulking
All fiberglass sections will expand and contract with temperature changes.

Therefore, joints between sections are filled with a flexible, elastic caulking. Should the joints need re-caulking, all the old filler should be removed, the fiberglass should be cleaned and joints should be re-filled using a flexible polyurethane sealant. DO NOT use plastic filler that will harden. Under no circumstances should the joints be fiberglassed over. Excess joint caulking should be removed from the slide surface by scraping it off with a putty knife. Any remaining traces should be wiped off with lacquer thinner applied to a rag. Do not pour lacquer thinner directly onto a flume joint as it can dissolve the sealant.
208
April 7, 2016 Page 18 Project # 31548 – Emerald Glen Aquatic Center

3.2 Joint Roughness
Joints may become rough with use, especially if metal articles are allowed down the slide. For minor chips and cracks, the joints may be fixed using the procedures outlined in Part III, Section 4.

More serious cases may require power sanding that will cut through the gelcoat.

This will require a spray application of new gelcoat by a trained person, finished by sanding and polishing and waxing as outlined in Part III.

4. Patching
Chips and cracks may appear in fiberglass flumes from normal usage. The following sections outline procedures to repair minor damage to slides. Due to the hazardous nature of materials used and variability of application methods, we recommend that a qualified fiberglass laminator perform the repairs.

4.1Minor Chips and Cracks
In areas that have chips or cracks in the gelcoat only, or have a scratch that is deep enough to penetrate through the gelcoat to the fiberglass but not deep enough to go completely through the laminate, follow the procedures given in Part III, Section 4.4.

NOTE: For damage that penetrates completely through or deep into the laminate, we recommend that a qualified fiberglass laminator perform the repairs.

4.2Surface Cracks
Hairline cracks, sometimes called spider webbing, or star cracks may develop in the gelcoat or surface coating of the fiberglass product. This is caused by a combination of weathering, vibrations, and/or impacts. Although unsightly, they do not necessarily affect structural strength. The hairline cracks can be fixed by sanding out the affected area with 100 grit sandpaper and re-coating the surface with gelcoat. Follow the patching instructions in Part III, Section 4.4.3, omitting steps 4 through 6.

4.3Cracks around Flanges
The area around the flanges of flumes contains a thick layer of gelcoat which is very stiff. Stresses from normal use may cause cracks in the gelcoat around the flanges.

These are not structural cracks. Flange cracks may be remedied by sanding the affected area with 100 grit sandpaper and re-coating with gelcoat. Follow the patching instructions in Part III, Section 4.4.3, omitting steps 4 through 6. 209
April 7, 2016 Page 19 Project # 31548 – Emerald Glen Aquatic Center

4.4Repair Procedures
WARNING:

Patching kits contain toxic, combustible and corrosive elements. Use only under well ventilated conditions. Do not inhale fumes. Seek medical attention if polyester resins are swallowed or inhaled. Should contact occur with the eye flush with water for 15 minutes and seek medical attention. If person is wearing contact lenses and the lenses did not flush out from the water, have the person try to remove AFTER the flushing procedure. If contents come in contact with skin or clothing, clean the area immediately with acetone.

Before you start, you will need:
1 Sandpaper: 36 - 100 grit; 220 - 320 grit wet and dry; 600 grit wet and dry 2 Sanding block
3 Acetone
4 2" masking tape
5 Utility knife
6 Putty knife
7 Mixing board
8 Mixing cup
9 Fiberglass resin hardener (catalyst), use a peroxide based catalyst (MEKP) 10 Patching compound
11 Gelcoat paint
12 2" fine paint brush
13 Automotive cut polish
14 High quality paste wax such as "Turtle" wax

4.4.1 Storage Instructions
Store uncatalyzed patching compound and gelcoat in closed metal containers in a cool area below 73° Fahrenheit (23° Celsius) out of direct sunlight. Do not allow to freeze.

Store liquid catalysts in their original containers according to manufacturer's instructions.

4.4.2 Mixing Instructions
Mix only small amounts at one time. The mixtures will harden in twenty (20) minutes to 1 hour, depending on the temperature and the amount of catalyst added. The mixture will harden faster at higher temperatures and with increasing amounts of catalyst added. Use caution when adding catalyst, over catalyzing will result in the mixture cracking. Do not pour catalyzed mixtures back into the can. Do not reduce materials with a "conventional" paint or lacquer thinner. 210
April 7, 2016 Page 20 Project # 31548 – Emerald Glen Aquatic Center Patching Compound: Add one (1) part catalyst to one hundred (100) parts patching compound on the mixing board. Mix well.

Gelcoat: Add one (1) part catalyst to one hundred (100) parts gelcoat in the mixing cup. Mix well.

4.4.3 Patching Instructions
1 Sand area to be patched with 36 -100 grit sandpaper. Feather sand to moulded surface and remove all rough edges.
2 Wash area clean with acetone and allow to dry.
3 Mask off area to be patched with 2" masking tape.
4 Using a putty knife, spread the patching compound smoothly over the prepared area to the top of the tape.

NOTE: Area must be dry and clear of contaminants, such as dirt and sanded particles, etc.
5 Keep the patched area dry and allow 20 minutes to 1 hour to harden. 6 After the patch has hardened, sand the patched area flush to the surrounding surface with 100 grit sandpaper.

NOTE: Sanding will remove the masking tape. Re-tape the area before painting.
7 Using a 2" fine paint brush, paint the area with gelcoat. Allow twenty (20) minutes to one (1) hour to dry.

NOTE: The paintbrush and tools can be cleaned with acetone. 8 After the gelcoat has dried, remove the masking tape. Using a sanding block, wet sand with 220 - 320 grit sandpaper. Repeat with 600 grit sandpaper. 9 Buff painted surface with auto cut polish and wash clean with water. 10 Wax and buff painted surface with a high quality paste wax. 211
April 7, 2016 Page 21 Project # 31548 – Emerald Glen Aquatic Center

PART IV

SUPPLEMENT TO MANUAL FOR ASTM STANDARDS
212
April 7, 2016 Page 22 Project # 31548 – Emerald Glen Aquatic Center

PART IV SUPPLEMENT TO MANUAL FOR ASTM STANDARDS

1. The ASTM standard F 2376-XX Standard Practice for Classification, Design, Manufacture, Construction, and Operation of Water Slide Systems.

The ASTM standard F 2376 for Water Slide Systems is a standard developed specifically to cover Water Slide systems. The standard references several other standards which together form the basis of a complete standard for the Design, Manufacture, Construction and Operation of Water Slide Systems. Operators are encouraged to become active members of the ASTM F24 group. The fees are nominal and provide access to the relevant standards. Operators should be aware of these standards and the responsibilities outlined within them.

General Description of Rides
Waterslides use the flow of water to propel or lubricate the movement of riders down a fixed fiberglass flume section. The riders may ride alone with no vehicle, in groups on specially designed inflatable inner tubes or on a custom made inflatable boat or raft.

The riding configuration depends on the specific product and the method of riding.

Description of Motion
Waterslide flumes are fixed in position and do not move. Propulsion is from gravity aided by water flow in the flume. Riders with or without vehicles will experience motion and accelerations consistent with the flume path. Movements include right and left turns, vertical curves, and deceleration at the finish. Riders or vehicles shall maintain constant contact with the flume ride surface.

Operational Restrictions Due to Weather
Wind - Waterslide structures are designed to withstand wind loads specified in the building code in force for the ride locations. WhiteWater recommends suspending operation during sustained winds in excess of 40 mph (64 kph).

Lightning - Virtually all waterslides use elevated towers as starting platforms.

Operation of rides should be suspended during any storm or weather conditions where lightning may occur.

Rain - Rain will have no effect on the operation of the slides, with one exception. All flumes rely on the cushioning and braking action of the specified water flow. Rain water can create a very slippery surface and without the braking action of the larger water flow can create an extremely hazardous condition. Under no circumstances should the slides be operated without the main water supply running at specified capacity. 213
April 7, 2016 Page 23 Project # 31548 – Emerald Glen Aquatic Center Safe water flow
The water flow rate is important to the safe operation of the ride. Operators shall make sure that the water supply is adequate. Insufficient water volume can result in higher speed. The water tends to restrain and cushion motions and impacts as well as reduce speed.

Evacuation and Emergency Procedures
In an emergency situation affecting the slide:
1 Top attendants shall cease dispatch of all riders.
2 If water flow is impeding the remedy of the emergency situation, use E-stop to turn off power to the pump(s).
3 Riders in the slide shall continue down the slide and exit normally if possible. 4 Attendants shall ensure all riders have exited the slide either through the bottom or at egress locations.
5 Patrons may remain queued on tower and stairs if they are not affecting the emergency situation.
6 If necessary to evacuate the tower, patrons shall be guided by top attendant to exit via the stairs from the start tower or egress location.
7 Slide should remain closed until cause of emergency situation is investigated and resolved.
8 In case of serious injuries or problems, operator should notify manufacturer and other regulatory bodies as required by law.

2. The ASTM standard F 853 - XX Standard Practice for Maintenance Procedures for Amusement Rides and Devices.

The ASTM Standard F 853 for Amusement Rides and Devices is a broad-based standard covering all the various rides and attractions encountered in the amusement industry. Most of the requirements are directed at complex mechanical devices that are subject to wear. These devices may have critical connectors and linkages that must be inspected regularly to avoid catastrophic failure. Waterslides in general are quite simple. The following is WhiteWater’s requirement for inspection of waterslides to conform to ASTM. These are to be used in conjunction with WhiteWater’s Operation & Maintenance Manual.

Operational Tests of Critical Operating Items
Waterslides use water pumped into the starting area of the ride to operate. The water volume is important to safe operation of the ride. In general, the less water volume pumped, the faster the rider will travel. If during operation, the water supply is restricted or fails, operators shall suspend operations when water volume is below specified operating requirements. A basic operational test should be performed daily in accordance with the Waterslides Operations & Maintenance Manual. 214
April 7, 2016 Page 24 Project # 31548 – Emerald Glen Aquatic Center Inspection of the fiberglass and sliding surface must be made daily in accordance with the Waterslides Operations & Maintenance Manual. Small chips or surface imperfections may cause injury to riders.

Recommended Maintenance/Inspection
The daily inspection of the slides is detailed in the Waterslides Operations & Maintenance Manual Part I - Section 3 and Part III - Section 1, which covers the operational components of the slide. The only other items that should be inspected are the supporting structures for the slides and start platforms.

Inspection of supporting structures:
• Steel structures that are hot dipped galvanized will require visual inspections on a semiannual basis. Areas around field welds should be carefully checked and touched up with zinc rich paint as necessary. If rust streaking occurs, the source should be identified and attended to. If steel structures are ten years old or greater, a comprehensive professional inspection should be performed.
• Steel structures that are painted without galvanizing should be visually inspected on an annual basis. If steel structures are five years old or greater, a comprehensive professional inspection should be performed.
• Wood structures should be visually inspected annually for integrity, tightness of fasteners and general condition. If wood structures are over five years old, a comprehensive professional inspection should be performed.

Climactic and operation conditions vary greatly and will affect the interval times above.

In more corrosive environments such as seaside or some indoor installations, the interval times should be reduced.

Other routine checks completed annually:
• All concrete filled stairs and decks should be visually inspected for worn finishes on the nosing and cracked concrete. The underside of the metal decking should be checked for deterioration.
• All welds should be visually inspected for condition and all bolts should be snug. • Anchor bolts should be checked for tightness and corrosion. Grout around base plates should be in good condition.
• Inspection and maintenance of fiberglass should be performed as per the WhiteWater Operations & Maintenance Manual Part III.

Comprehensive professional inspections should be performed by a qualified engineering or inspection firm. They perform inspections with methods they deem appropriate to assure accurate review of the structure. These methods may include non-destructive testing using ultrasound or other techniques. Inspection would include condition of metal components, welds, bolts, and any other critical items. The inspecting agency should produce a certificate of inspection and/or a report on condition for review by a qualified engineer.
215
April 7, 2016 Page 25 Project # 31548 – Emerald Glen Aquatic Center Fiberglass Wear Limits
The fiberglass should be inspected regularly as per the WhiteWater Operations & Maintenance Manual Part I - Section 3 and Part III - Section 1. The riding surface of the flume is subject to wear and weathering. The exterior of the slide is subject to weathering. The fiberglass should be inspected professionally if five years old or older.

Other Wear Limits
Rides using boats will experience wear on the boats. If the wear is excessive it may impair the function of the boat and operation of the ride. This is especially true if the ride uses shutdown lanes. The wear should be checked in accordance with the boat manufacturer’s recommendations.

Replacement Fasteners
All replacement fasteners shall conform to the standards specified in the engineering drawings.

Electrical / Mechanical Systems Operation and Maintenance All electrical motors, pumps, controls etc. shall be inspected and maintained in accordance with their manufacturer's recommendations.

All pump intake grating or screens must be inspected to ensure that no structural flaw is evident.

Note: Whenever inspection or maintenance work is being done on electrical/mechanical systems, including pump intake grating, all related equipment must be electrically isolated using recognized equipment lock out procedures. 216
April 7, 2016 Page 26 Project # 31548 – Emerald Glen Aquatic Center Appendix 1-I

TYPICAL DAILY WATER QUALITY LOG

WATER TEST FILTER CHECK
Time Chlorine Count pH Water Clarity Backwash Temperature Initial 10:
11:
12:
13:
14:
15:
16:
17:
18:
19:
20:
21:
22:
23:
24:

Location: Date:

Weather:
217
April 7, 2016 Page 27 Project # 31548 – Emerald Glen Aquatic Center Appendix 1-II

TYPICAL FIRST AID REPORT
First Name of Victim: Middle
Initial:

Name of Person Filling Report:

Last Name: Location Address:

Mailing Address: City: State/Province:

City: State/Province: Zip/Postal Code: Location Phone #:

Zip/Postal Code: Phone #: Location Name:

Date (MM/DD/YY) and Time of injury (month) (day) 20 , at a.m. / p.m.

Date and Time Injury Reported to First Aid
Attendant
(month) (day) 20 , at a.m. / p.m.

Location of Accident:

What Happened – Victim Statement:

Name of Witness:

Witness Mailing Address:

City: State/Province: Postal Code:

What Happened – Witness Statement:

First Aid Attendant Description of Injury:

Was an Ambulance called (circle) Yes / No Manager on Duty:

Manager Statement:

I hereby certify that the above statement is true to the best of my knowledge.

Victim Signature Witness Signature First Aid Attendant Signature Manager on Duty Signature 218
April 7, 2016 Page 28 Project # 31548 – Emerald Glen Aquatic Center Appendix 1-III

EMERGENCY PHONE NUMBERS
Location Name: Location Phone:

Location
Address:

DIAL 911 for Police, or Medical Emergency (if available in your area)

EMERGENCY SERVICES
Police: Sheriff:

Hwy Patrol: Ambulance:

PLUMBER VENDING MACHINE COMPANY
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

GENERAL CONTRACTOR WATERSLIDE MANUFACTURER
Company Name: Company Name: WhiteWater West Industries Ltd.

Contact Name and
Phone:

Contact Name and
Phone:
604-273-1068
Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

ELECTRICIAN
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:

SWIMMING POOL SUPPLY
Company Name: Company Name:

Contact Name and
Phone:

Contact Name and
Phone:

Secondary Contact
Name and Phone:

Secondary Contact
Name and Phone:
219
1 Revision 6
November 1, 2016
www.whitewaterwest.com
6700 McMillan Way
Richmond, BC Canada V6W
1J7
AquaDrop Generation 2
Operations Manual
220
2 Table of Contents

1. ........................................................................................................................................... Introduc tion...................................................................................................................4

2. ........................................................................................................................................... Slide Overview ..........................................................................................................5

2.1. Entry Capsule................................................................................................................................. 6

2.1.1. Ride Control Console (“RCC1” Panel) ........................................................................................ 7

2.1.2. Multi-Launch Console (“OPM” Panel) ....................................................................................... 8

2.2. Slide Flume.................................................................................................................................... 8

2.3. Shutdown Lane.............................................................................................................................. 9

2.3.1. Shutdown Lane Flow Transition ................................................................................................ 9

2.4. Shutdown Bowl ............................................................................................................................. 9

3. ........................................................................................................................................... Operatio n.....................................................................................................................10

3.1. Operator...................................................................................................................................... 10

3.2. Operations Key ............................................................................................................................ 10

3.3. Rider............................................................................................................................................ 11

3.4. Rider Position .............................................................................................................................. 12

3.4.1. Dispatch into Shutdown Lane.............................................................................................. 12

3.4.2. Dispatch into Shutdown Bowl ............................................................................................. 12

3.5. System Start-Up........................................................................................................................... 13

3.5.1. Daily Slide Surface Inspection.............................................................................................. 13

3.5.2. Weekly Detailed Inspection and Cleaning ........................................................................... 14

3.5.3. Commencing Daily Operations (Start-up)............................................................................ 15

3.6. Loading Rider............................................................................................................................... 17

3.7. Launching Rider........................................................................................................................... 18

3.8. Aborting Launch .......................................................................................................................... 20

3.9. Emergency Stop........................................................................................................................... 20

3.10. Power Failure .......................................................................................................................... 20

3.11. Occupied Slide/Clearing the Slide............................................................................................ 20

3.12. End-Of-Slide Normal Operations............................................................................................. 21

3.13. System Faults........................................................................................................................... 22 221
3 3.13.1. Clearing Faults..................................................................................................................... 22

3.14. Daily End of Operation (System Shutdown) ............................................................................ 23 222
4 223
5 THE SAFETY CONTROL SYSTEM DOES NOT

REPLACE THE NEED FOR VIGILANT AND
SKILLED OPERATION. ULTIMATE
RESPONSIBILITY FOR SAFETY LIES WITH YOU!

FAILURE TO FOLLOW THE GUIDELINES SET

FORTH IN THIS MANUAL MAY CREATE A

HAZARD OR CAUSE OPERATIONAL

UNRELIABILITY

1. Introduction
Congratulations on your purchase of the AquaDrop waterslide from WhiteWater West Industries Ltd. The AquaDrop is an advanced slide involving electro-mechanical control and requires special attention. Please read both the Operations Manual and Maintenance Manual carefully before operating your new slide. These manuals include critical information to help keep your AquaDrop slide operating safely and reliably.

The AquaDrop slide from Whitewater West Industries Ltd. incorporates an extremely reliable safety control system. It is important to bear in mind that this safety control system does not replace the need for vigilant and skilled operation. Ultimate responsibility for safety lies with the operator.

This manual contains basic instructions to safely operate the AquaDrop slide and may also be used for training purposes.

To ensure that this slide is maintained and operated safely, only trained operators are permitted to operate the AquaDrop slide. Operators must understand the sequence of operations and must monitor each slide. Operators must make sure that the rider meets the requirements for the slide, and that he/she is in correct riding position.

By pressing the launch buttons and dispatching a rider, the operator confirms that they have checked the slide, that it is safe, and there is no previous rider in the slide or in the shutdown lane/bowl.

Following the Operations and Maintenance manuals will ensure the safest operation of this slide. 224
6 1
2 3a
3b

2. Slide Overview
This section describes the various components of the AquaDrop slide.

Note that your slide flume may be different than what’s shown below.

Figure 1: AquaDrop Overview
Item Name Function
1 Entry Capsule Dispatches riders into the slide
2 Slide Flume Path which rider travels
3a Shutdown Lane Area where rider comes to rest and safely exit the slide 3b Shutdown Bowl Area where rider comes to rest and safely exit the slide 225
7 1
3 4
2 2.1. Entry Capsule
The Entry Capsule is used to load the rider into the slide and launch him/her in a safe and controlled manner.

It is recommended to place a foot wash tub or station immediately prior to the slide entry to prevent dirt and sand from entering the slide. Ensure that the wash tub does not present a slip, fall or trip hazard.

Figure 2: Side View of Entry Capsule (left) and Section View of Entry Capsule (right)
Item Name Function
1 Entry Door Permits access to the Entry Capsule.
2 Trapdoor Floor that rider stands on prior to dispatch. 3 Back Panel Removable panel for maintenance access.
4 Front Shroud Removable shroud for maintenance access. 226
8 2 3
7 4 6
5 1

2.1.1. Ride Control Console (“RCC1” Panel)
The Ride Control Console (“RCC1” panel) is the primary operational console for the AquaDrop. The “RCC1” panel is located adjacent to the Entry Capsule and houses many of the control elements for the slide.

Figure 3: “RCC1” Panel
Item Name Function
1 Operations Key • Used by operator to turn the slide on and off. 2 “LAUNCH 1” / “DOOR OPEN”
Pushbutton
• Solid green light means rider can be launched. “LAUNCH 1” and “LAUNCH 2” pushbuttons pressed and held
simultaneously for three seconds will launch a rider.
• Press and hold “LAUNCH 1” pushbutton to open door.
3 “LAUNCH 2” / “DOOR CLOSE”
Pushbutton
• Solid green light means rider can be launched. “LAUNCH 1” and “LAUNCH 2” pushbuttons pressed and held
simultaneously for three seconds will launch a rider.
• Press and hold “LAUNCH 2” pushbutton to close door.
4 “ALARM” Lamp / “CLEAR” Pushbutton • Solid amber light indicates that the slide is occupied. • Flashing amber light indicates an alarm or fault.
• Press the “CLEAR” pushbutton at “RCC1” panel after a
rider has been launched into the slide to reset the trapdoor. 5 “EMERGENCY STOP” • Press the pushbutton in an emergency situation to stop the slide.
6 PLC Code Window • Viewing window to read PLC display. 7 Error Code Legend • Display list of error codes
227
9 2
1 3

THE FIBERGLASS JOINTS ON THE RIDING

SURFACE MUST BE THOROUGHLY CHECKED

WEEKLY TO ENSURE A SMOOTH TRANSITION
THAT IS ALSO FREE OF EXCESS CAULKING!

2.1.2. Multi-Launch Console (“OPM” Panel)
The multi-launch console is an additional ride control console that can be used to launch multiple AquaDrop slides simultaneously.

The multi-launch console is not a standard component and your slide may not have one installed.

Figure 4: Multi-Launch Console, “OPM” Panel
Item Name Function
1 Multi-Launch Console Console to operate multiple AquaDrop slides simultaneously.
2 Override Switch Rotary switch for overriding the corresponding ride
control console (“RCC1” panel).
3 Launch Buttons Two pushbuttons used to launch multiple Entry Capsules
simultaneously.

2.2. Slide Flume
The slide flume is the length of joined fiberglass sections that the rider slides upon.

Proper inspection and maintenance procedures must be followed to maintain the surface of the slide flume.
228
10 2.3. Shutdown Lane
The shutdown lane is the area in which riders come to rest after completing the slide.

Located near the shutdown lane is the “OP_EOS” panel which features an “Emergency Stop” pushbutton and a “CLEAR” pushbutton. The “Emergency Stop” pushbutton is used to disable operation of the slide
in the event of an emergency, and the “CLEAR” pushbutton is used to acknowledge that the shutdown lane area is clear of any riders or other hazards before another launch is permitted.

2.3.1. Shutdown Lane Flow Transition
Before another rider can be dispatched, the flow transition associated with the slide must be between the specified markers.

Figure 5: Flow Transition in Shutdown Lane (left), Flow Transition Markers (right)

2.4. Shutdown Bowl
The shutdown bowl is the area in which riders come to rest after completing the slide.

Located near the exit of the shutdown bowl is the “OP_EOS” panel which features an “Emergency Stop” pushbutton and a “CLEAR” pushbutton. The “Emergency Stop” pushbutton is used to disable operation of the slide in the event of an emergency, and the “CLEAR” pushbutton is used to acknowledge that the shutdown bowl area is clear of any riders or other hazards before another launch is permitted. 229
11 Figure 6: Shutdown Bowl
230
12 WARNING: THE SPARE OPERATIONS KEY MUST BE

LOCKED AWAY AND MUST NOT BE USED FOR

DAILY OPERATIONS OR MAINTENANCE
PROCEDURES!

3. Operation
This section will illustrate proper operational procedures for the AquaDrop. Following these procedures will ensure a safe and enjoyable experience for the rider and operator.

3.1. Operator
The operator should be in good physical and mental condition to operate this slide.

Operators must have the following knowledge and qualifications:
✓ Training on how to safely operate the AquaDrop.
✓ Knowledge of the system’ssequence of operation.
✓ Lifeguard certification including First Aid training. ✓ Experience climbing inside slides; must be able to check and maintain the system. ✓ Must be able to perform checks of the Entry Capsule, slide flume and Shutdown lane/bowl. ✓ Must follow the safety rules.

3.2. Operations Key
The Operations Key is a critical component of the AquaDrop safety system. Although two Operations Keys are supplied with each AquaDrop slide, only one key is required for operation and maintenance of the AquaDrop.

The second Operations Key is only provided as a spare and must only be used in the event that the original Operations Key was lost or damaged. The spare key must be locked away in a secure location and only be accessible by authorized personnel.

The use of both keys as part of daily operations and maintenance procedures is prohibited as it will bypass the safety system and could result in injury to guests or staff. 231
13 WARNING: THIS IS AN EXTREME RIDE. PERSONS

WITH BACK OR NECK PROBLEMS, PREGNANT

WOMEN, OR PERSONS WITH HEART CONDITIONS
PROHIBITED!
PROPER SWIMSUITS MUST BE WORN!
(NO JEAN SHORTS, T-SHIRTS OR ADDITIONAL

CLOTHING SHALL BE WORN IN THE RIDE)

3.3. Rider
Due to the high g-forces and speeds experienced during the ride, riders must be in good physical and mental condition with no medical issues.

Riders must meet the following requirements, and these requirements must be posted on a sign near the Entry Capsule.
• Persons above a weight of 136 kg [300 lb.] are not allowed to ride. • Persons have to be at least 1.22 m [48 in] tall.
• Pregnant women are not allowed to ride.
• Persons having medical restrictions are not allowed to ride. • Riders are not allowed to carry any items such as purses, life jackets, mats, glasses, shoes. • Riders are not allowed to wear any jewelry.
232
14 3.4. Rider Position
The position of the rider prior to dispatch from the capsule depends on the termination of the slide; either into a shutdown lane or into a shutdown bowl, as described below.

3.4.1. Dispatch into Shutdown Lane
To safely dispatch a rider into a shutdown lane, they must be standing upright at the rear of the capsule, with both feet on the trapdoor, looking straight ahead.

They must have their head back, legs firmly crossed at the ankles, and arms crossed on the chest, as shown below in Figure 7.

3.4.2. Dispatch into Shutdown Bowl
To safely dispatch a rider into a shutdown bowl, they must be standing upright at the rear of the capsule, with both feet on the trapdoor, looking straight ahead.

They must have their head back, legs firmly crossed at the ankles, and hands clasped together behind head, as shown below in Figure 8.

Figure 7: Shutdown Lane Rider Position Figure 8: Shutdown Bowl Rider Position 233
15 WATER MUST BE OFF AND OPERATION KEY
REMOVED!

3.5. System Start-Up
The purpose of the initial start-up process is to perform safety checks on the various slide components, as well as perform maintenance tasks prior to commencing operation.

While conducting the system start-up, guests must not have access to the slide. The public entrance must remain closed at all times during start-up.

The maintenance inspections must be performed prior to commencing daily operations.

Inspection of the Entry Capsule equipment must be performed and recorded in accordance with the Operations and Maintenance manual.

At least two operators are needed to carry out a number of the inspection checks.

3.5.1. Daily Slide Surface Inspection
This section will describe the daily slide surface inspection procedure.

Procedure: Daily Slide Surface Inspection
Equipment: Two people are required
Materials: -
Frequency: Daily
Procedure: 1) The trapdoor must be hanging down, not fully open or fully closed.

Refer to the Maintenance Manual for instructions on how to release the trapdoor for maintenance.
2) Remove the front shroud and shut off the air supply at the regulator. Observe proper lockout, tag out (LOTO) procedures. 3) Ensure the Operations Key is removed from the “RCC1” panel.

This ensures the system is off and that no one can operate the slide.
4) Lift out and examine the trapdoor assembly. Carefully inspect the trapdoor for chips, cracks, or foreign objects. Refer to the Maintenance Manual for instructions on how to access the trapdoor for maintenance.
5) Carefully inspect all tubing, wires, valves, and connectors for signs of wear or corrosion.
6) Look down into the slide and, to the extent possible, examine the slide surface for hazards.
7) Examine the Entry Capsule door for cracks, scratches, corrosion, or damage.
234
16 8) Carefully examine the shutdown lane/bowl for debris, damage, or
235
17 WATER SYSTEM MUST BE CYCLED OFF/ON ONCE
EVERY 24 HOURS. ORDINARY “WATER OFF AT
NIGHT, ON IN THE DAY” WILL ACCOMPLISH THIS.

NECESSARY SENSOR CHECKS OCCUR

AUTOMATICALLY

3.5.2. Weekly Detailed Inspection and Cleaning
Procedure: Weekly Detailed Inspection and Cleaning
Equipment: Two people are required
Materials: -
Frequency: Weekly
Procedure: 1) Ensure all workplace health and safety regulations are followed at all times. It is your responsibility to know and understand these regulations.
2) The trapdoor and the entry door need to be released. Refer to the Maintenance Manual for instructions on how to release the trapdoor and entry door for maintenance.
3) Secure yourself using appropriate fall protection equipment, as per the health and safety regulations in your area.
4) Push open the Entry Capsule Door, and block it open. 5) Use appropriate equipment and techniques to abseil/rappel down the slide to the shutdown lane/bowl while:
a. Cleaning the slide surface.
b. Waxing the ride surface every four weeks is
recommended to prevent calcium/mineral buildup,
improve water lubricity, and to increase rider comfort. c. Inspecting the joints and slide surface checking for and removing if necessary:
i. Calcium/buildups
ii. Protruding caulking
iii. Chips/cracks/bad scratches
iv. Debris
d. Cleaning the sprayers (Flatline Loop only). Blow
through the sprayer nozzle to ensure it is not blocked. 6) Ensure all tools and equipment have been removed from the ride. unsatisfactory joints.
9) Enter the slide at the end of the shutdown lane/bowl and crawl upstream as far as possible, checking for and
removing if necessary:
a) Calcium/buildup
b) Protruding caulking
c) Chips/cracks/bad scratches
d) Debris
10) Remove and clean all filters, hair strainers, basket filters, etc. in the slide water system.
236
18 3.5.3. Commencing Daily Operations (Start-up)
In order to commence operations of the AquaDrop, the following procedure must be completed.

Procedure: Commencing Daily Operations (Start-up)
Equipment: Two people are required
Materials: -
Frequency: Daily
Procedure: 1) Perform pre-startup daily maintenance and inspections. 2) Turn on water supply for:
a) Launch
b) Shutdown lane/bowl water
c) Sprayers
3) Verify adequate water flows by:
a) Inspecting all flow meters,
b) Visually observing water injection points and the
shutdown lane/bowl.
i) The Launch water is clearly visible through the door of the Entry Capsule.
ii) The Shutdown lane/bowl water can be seen by
observing the injectors through the transparent trapdoor panel.
iii) The sprayers can be observed indirectly though the translucent fiberglass (Flatline Loop only, if applicable) 4) Verify the air compressor is active, and supplying at least 95 psi. 5) Insert the Operations Key into the “RCC1” panel, and turn it clockwise.
6) Look at the two digit code displayed inside the “RCC1” panel. If it is “UE 33”, proceed to the next step. If the error code is “UE 11”, it has been more than 24 hours since the water supplies have been cycled. All pumps must be turned off and allowed to completely cease movement. Once this is done, return to step 5.

Refer to Maintenance Manual for troubleshooting techniques. 7) Clear the End-of-Slide area:
a) Inspect the shutdown lane/bowl and surrounding areas for hazards.
b) If no hazards exist, press the “EOS_CL” button on the “OP_EOS” panel to confirm the shutdown area is clear to begin operations.
8) Clear the Entry Area:
a) Inspect the entry area for hazards.

ONCE PUMPS ARE OPERATIONAL, A VISUAL
INSPECTION OF THE RIDE’S WATER SUPPLY
MUST BE DONE.
237
19 b) If no hazards exist, press the button on “RCC1” panel labeled “ALARM LAMP/CLEAR BUTTON” to confirm the entry area is
clear to
238
20 begin operations.
9) If the trapdoor was open, it will close itself. In this situation, the slide will enter the “occupied” state (fault code “UE 88”).

Repeat steps 7 and 8 to clear the occupied status of the slide.
10) Once the slide is ready for operation, the entry door will immediately open. This is the signal that the slide control system is ready for regular operation. The code shown in the window will be “UE 00” when the slide is ready for
operation.
239
21 WHILE THE ENTRY DOOR IS OPEN THE

TRAPDOOR CANNOT OPERATE AND A RIDER
CANNOT BE LAUNCHED!

3.6. Loading Rider
When the operator is ready to load a rider into the Entry Capsule, he or she presses and holds the “DOOR OPEN” pushbutton until the door is all the way open.

If there is a problem while loading, the operator can release the door control pushbutton and the door will stop moving and hold in place. As soon as the operator is ready, he or she can resume operation using the door control pushbuttons.

When the operator has completed loading the rider into the Entry Capsule, and the rider is standing in the proper riding position, the operator can close the Entry Capsule door by pressing and holding the “DOOR CLOSE” pushbutton until the door is completely closed.

When the door is closed the rider cannot exit the Entry Capsule without the operator opening the door.

Procedure: Loading a Rider
Equipment: -
Materials: -
Frequency: As required
Procedure: 1) Press and hold the button labeled “DOOR OPEN” until the door is fully open.
2) Have the guest enter the Entry Capsule, assisting them if necessary.
3) Instruct the guest to assume the proper riding position, and visually ensure that they do so.
4) Press and hold the button “DOOR CLOSE”, and the door will begin to close. Maintain visual contact with the guest at all times to ensure they are not pinched by the door.
240
22 ENSURE THE RIDER IS IN THE PROPER RIDE
POSITION BEFORE LAUNCHING!

ENSURE THE FLOW TRANSITION HAS RETURNED
TO THE PRESET MARKS BEFORE LAUNCHING!

ENSURE THE RIDE IS CLEAR OF ALL RIDERS
AND HAZARDS BEFORE LAUNCHING!

ENSURE ONLY ONE RIDER IS IN THE ENTRY
CAPSULE BEFORE LAUNCHING!

3.7. Launching Rider
The following section outlines the steps to safely launch a rider.

There are two ways to launch the rider; from the “RCC1” panel or from the multi-launch console (if applicable). The following sections will describe both launching procedures.

If the rider is ready, in the correct riding position, and the operator is ready to launch the rider, the operator presses and holds the two launch pushbuttons (same for multi-launch console), thus activating the timer for release of the trapdoor.

Upon pressing and holding the two launch pushbuttons an audible countdown will begin; “three, two, one”.

During the countdown, the operator should continue to observe the rider to ensure the rider maintains the proper launch position.
241
23 When the countdown reaches “one”, and the operator still has the two launch pushbuttons pressed, the trapdoor will open, thus launching the rider.

Procedure: Launching a Rider from the Ride Control Console (“RCC1” panel) Equipment: -
Materials: -
Frequency: As required
Procedure: 1) Make sure the override switch on the multi-launch console is in the OFF position. NOTE: It is defaulted OFF if there is no multi-launch console installed.
2) Verify that it is safe and appropriate to launch the guest in the manner typical to waterslide operations.
3) Simultaneously press and hold both pushbuttons “LAUNCH 1” and “LAUNCH 2” for 3.5 seconds. After 0.5 seconds, the
countdown message will play inside the capsule. Maintain visual contact with the
guest inside the launch capsule at all times to ensure they maintain an appropriate ride position. Should the guest fail to maintain the appropriate ride position, abort the launch by releasing either or both pushbuttons.
4) After the pushbuttons are continuously held for 3.5 seconds, the trapdoor will open, launching the guest into the slide. The pushbutton
labeled “ALARM LAMP/CLEAR BUTTON” will illuminate without flashing, indicating the slide is occupied.
5) When you are certain the guest has safely left the launch capsule, you may optionally press the pushbutton labeled “ALARM LAMP/CLEAR
BUTTON” to immediately close the trapdoor.
6) When the trapdoor is safely closed and locked upright, the entry door will immediately open. Pressing either button will interrupt this opening, and then the door can be closed and opened normally.
7) Another rider cannot be launched until the operator at the End-ofSlide has pushed the “CLEAR” button to indicate that the previous rider has
left the shutdown lane/bowl.

Procedure: Launching a Rider from the Multi-Launch Console (“OPM” Panel) Equipment: -
Materials: -
Frequency: As required
242
24 Procedure: 1) Turn the override switches which correspond to the rides you wish to control from the multi-launch console (“OPM” panel) on multi-launch console to the ON position. They will illuminate.

The pushbuttons “LAUNCH 1/DOOR OPEN” and “LAUNCH
2/DOOR CLOSE” will begin to flash slowly.
2) These two pushbuttons on the multi-launch console (“OPM” panel) now operate identically to the individual buttons on all overridden rides. The
pushbuttons on “OPM” panel will open and close all doors, and when held together for 3.5 seconds, launch all riders.
243
25 **The multi-launch console is an accessory and can be purchased and installed as part of the Entry Capsule package or separately.

At any time prior to launch the operator can open the entry door, reposition the rider, remove the rider, or load a new rider.

Once the rider has been launched, it is impossible to launch another rider until the slide has been cleared.

Once the slide is cleared, the entry door will open automatically to indicate that another rider can be loaded.

3.8. Aborting Launch
Both launch methods have a three second window to abort the launch. To abort the launch within this window, simply release one or both of the “LAUNCH” pushbuttons on either the operator console or multi-launch console. The audible countdown will continue but the rider will not be launched.

To resume a launch once the rider is in the correct position, the operator can press the two launch pushbuttons and the countdown will start again.

3.9. Emergency Stop
There are two “EMERGENCY STOP” pushbuttons located throughout the slide; one at the Entry Capsule (“RCC1” panel) and one at the shutdown lane/bowl (“OP_EOS” panel).

Press one of the “EMERGENCY STOP” pushbuttons any time the slide needs to be shut down in an emergency situation. This will disable all operations of the ride.

3.10. Power Failure
In the event of a power failure prior to launch, immediately stop operations. The AquaDrop is equipped with a battery backup unit, but it is of limited capacity, and should not be used to conduct regular operations. Unload the guest, close the door, remove the Operations Key from the “RCC1” panel, and wait for the power to return.

In the unlikely event that power is lost and the battery backup fails, a purely mechanical guest removal system is provided. Refer to the Maintenance Manual for instructions on how to manually open the entry door.

3.11. Occupied Slide/Clearing the Slide
Once the rider has been launched into the slide, the system will require verification that the rider has completed and safely exited the slide. The amber light on the operator 3) After safely dispatching the guests from the selected launch capsules, you may optionally press either “LAUNCH”
pushbutton to immediately reset the trapdoors and begin loading the next set of riders.
244
26 console will remain lit to indicate that the ride is occupied until the following events have been taken place:
245
27 1. The rider is launched from the capsule and the lifeguard at the tower has pressed the “CLEAR” pushbutton at the “RCC1” panel.

2. The lifeguard at the shutdown lane/bowl has pressed the “CLEAR” pushbutton to indicate that the rider has safely exited the slide.

Another rider cannot be launched into the slide until all of these conditions are met.

3.12. End-Of-SlideNormal Operations
The operator at the End-Of-Slide/Shutdown area is an active participant in safe ride operation. The following procedure will describe normal end-of-slide operations.

Procedure: End-Of-Slide Normal Operations
Equipment: -
Materials: -
Frequency: As required
Procedure: 1) Pay sufficient attention to operations at the slide entry capsule to know when a rider has entered the slide. If you detect a hazard at any time, press the Emergency Stop button.
2) In normal operation, the rider will successfully complete the slide, and enter the shutdown lane/bowl.
3) When the rider exits the shutdown lane/bowl, and the area is free from hazards, press the “EOS_CL” button on the “OP_EOS” panel. Only after this has been done will another launch be permitted by the control
system.

Once these actions have been completed the trapdoor will reset into the up (closed) position and the Entry Capsule door will open so that another rider can be loaded. 246
28 3.13. System Faults
If the system detects an error in operation it will go into system fault mode to avoid possible unsafe situations. The amber light on the operator console will flash to warn of a fault.

3.13.1. Clearing Faults
In the event that the control system detects a fault, the following procedure must be completed.

Refer to the Maintenance Manual for detailed instructions on troubleshooting fault codes.

Procedure: Clearing Faults
Equipment: -
Materials: -
Frequency: As required
Procedure: 1) Identify the problem which has caused the fault by referring to the “Error Code Legend” on the front of the “RCC1” panel. 2) Fix the problem which faulted the system. If you cannot resolve the problem, contact Maintenance personnel.
3) If fixing the problem required that the control system be powered off, restore system power, and complete the procedure
described under “Start Up”, otherwise:
4) Clear the end of slide area:
a. Inspect the shutdown lane/bowl and surrounding
areas for hazards.
b. If no hazards exist, press the “EOS_CL” button to
confirm the shutdown area is clear to begin operations. 5) Clear the entry area:
a. Inspect the entry area for hazards.
b. If no hazards exist, press the button on “RCC1” panel labeled “ALARM LAMP/CLEAR BUTTON” to confirm
the entry area is clear to begin operations.
6) If the control system detects no further faults, the display within the “RCC1” panel will flash “UE 00”, and operations can commence.
7) If the problem persists, contact Maintenance personnel. 247
29 DO NOT LEAVE THE OPERATIONS KEYS IN THEIR

RESPECTIVE PANELS OVERNIGHT AS THEY MAY
BECOME LOST OR STOLEN!

3.14. Daily End of Operation (System Shutdown)
At the end of daily operations, the slide must be shut down safely to ensure no unauthorized use of the slide. To accomplish this, the following procedure must be performed.

Procedure: Daily End of Operation (System Shutdown)
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1) Fully close the entry door using the pushbutton “DOOR CLOSE”.

Ensure there are no riders, tools, or other hazards within the Entry Capsule.
2) For outdoor slides where strong winds are common, it’s recommended to use a strap or other means to secure the door closed overnight. This will help prevent any unnecessary damage to door assembly.
3) When the door is fully closed, remove the Operations Key from “RCC1” panel.
4) Store the Operations Key in a safe location as determined by park management.
5) Turn off all water supplied to the slide.
6) It is not recommended to turn off the air compressor, as it takes some time to fully recharge the tank after a shutdown.
248
1 Revision 4
October 16, 2015
www.whitewaterwest.com
6700 McMillan Way
Richmond, BC Canada V6W
1J7
AquaDrop Generation 2
Maintenance Manual
249
2 Table of Contents

1. Introduction...............................................................................................................................5

2. Mechanical................................................................................................................................6

2.1. Removing Launch Shroud.................................................................................................6

2.2. Access Panels ....................................................................................................................7

2.3. Trapdoor Assembly ...........................................................................................................8

2.3.1. Releasing the Trapdoor for Maintenance ...................................................................8

2.3.2. Accessing the Trapdoor for Maintenance...................................................................9

2.3.3. Returning the Trapdoor after Maintenance ..............................................................10

2.3.4. Trapdoor Panel Inspection........................................................................................10

2.3.5. Cleaning the Trapdoor Panel....................................................................................11

2.3.6. Roller Bar Inspection ...............................................................................................12

2.3.7. Rollers......................................................................................................................14

2.3.7.1. Inspection of Rollers.................................................................................................... 14

2.3.7.2. Replacement of Rollers ............................................................................................... 14

2.3.8. Bumpers ...................................................................................................................15

2.3.8.1. Inspection of Bumpers................................................................................................. 15

2.3.8.2. Replacement of Rubber Bumpers............................................................................... 15

2.3.9. Retaining Ring Inspection........................................................................................16

2.3.10. Roller Plate Inspection .............................................................................................18

2.3.11. Trap Inspection.........................................................................................................19

2.3.12. Hinge Inspection ......................................................................................................20

2.3.13. Rubber Coupler Inspection.......................................................................................20

2.3.14. Pushrod Linkage.......................................................................................................22

2.3.14.1. Inspecting the Pushrod Linkage................................................................................... 23

2.3.14.2. Adjusting the Pushrod Linkage .................................................................................... 24

2.4. Entry Door Assembly ......................................................................................................26

2.4.1. Entry Door Inspection ..............................................................................................27

2.4.2. Cleaning the Entry Door Acrylic..............................................................................28

2.4.3. Disengaging the Entry Door for Maintenance/Emergency Release .........................29

2.4.4. Re-engaging the Entry Door for Normal Operations ...............................................30 250
3 2.4.5. Entry Door Hinge Inspection....................................................................................31

2.4.6. Replacing the Linear Actuator .................................................................................32

2.4.7. Replacing Safety Switch Components .....................................................................34

3. Pneumatics..............................................................................................................................36

3.1. Air Supply .......................................................................................................................37

3.1.1. Air Preparation Unit.................................................................................................37

3.1.2. Pressure Regulator for Rotary Actuator...................................................................38

3.1.3. Flow Control Valve for Drop Cylinder ....................................................................39

3.1.4. Turning off Air Supply.............................................................................................39

3.1.5. Adjusting Unit Air Pressure .....................................................................................40

3.1.6. Replacing Filter........................................................................................................40

3.2. Solenoid Valves...............................................................................................................41

3.2.1. Replacing a Solenoid Valve .....................................................................................41

3.3. Rotary Actuator ...............................................................................................................42

3.3.1. Rotary Actuator Replacement ..................................................................................42

3.4. Trapdoor Drop Cylinder..................................................................................................48

3.4.1. Replacing the Trapdoor Drop Cylinder....................................................................48

4. Electrical .................................................................................................................................51

4.1. “PCC1” Panel ..................................................................................................................51

4.2. “RCC1” Panel..................................................................................................................51

4.2.1. Removing the Operations Key .................................................................................52

4.2.2. Turning the Slide ON...............................................................................................52

4.2.3. Turning the Slide OFF..............................................................................................53

4.2.4. Turning Power OFF to Slide ....................................................................................53

4.2.5. Cycling Power to the PLC........................................................................................54

4.3. Speaker ............................................................................................................................55

4.4. Trapdoor Sensors.............................................................................................................56

4.4.1. Adjusting Rotary Actuator Proximity Sensor...........................................................57

4.4.2. Replacing Rotary Actuator Proximity Sensor..........................................................58

4.4.3. Adjusting Drop Cylinder Proximity Sensor .............................................................58

4.4.4. Replacing Drop Cylinder Proximity Sensor.............................................................59 251
4 4.4.5. Adjusting Roller Bar Proximity Sensor....................................................................59

4.4.6. Replacing Roller Bar Proximity Sensor...................................................................61

4.4.7. Framing Square Test ................................................................................................61

4.4.8. Pressure Switch for Valve Failure Detection ...........................................................65

5. Water.......................................................................................................................................67

5.1. Sprayer Nozzles (Flatline Loop Only).............................................................................67

5.1.1. Routine Visual Inspection and Cleaning of Sprayer Nozzles...................................67

5.2. Paddle Flow Switches......................................................................................................67

6. Preventative Maintenance .......................................................................................................69

6.1. End of Season Maintenance.............................................................................................70

7. Troubleshooting ......................................................................................................................71

7.1. Fault Codes......................................................................................................................71

7.2. Common Problems..........................................................................................................72

7.3. Fault Code “UE 00”.........................................................................................................73

7.4. Fault Code “UE 07”.........................................................................................................73

7.5. Fault Code “UE 11”.........................................................................................................73

7.6. Fault Code “UE 22”.........................................................................................................74

7.7. Fault Code “UE 23”.........................................................................................................75

7.8. Fault Code “UE 32”.........................................................................................................75

7.9. Fault Code “UE 33”.........................................................................................................76

7.10. Fault Code “UE 53” .....................................................................................................77

7.11. Fault Code “UE 88” .....................................................................................................77

8. Technical Support ...................................................................................................................78

9. Spare Parts ..............................................................................................................................79

10. Appendix.............................................................................................................................80

10.1. AquaDrop Flow Chart..................................................................................................80

10.2. I/O Table......................................................................................................................81 252
5 FAILURE TO FOLLOW THE GUIDELINES SET

FORTH IN THIS MANUAL MAY CAUSE THE

AQUADROP SLIDE TO STOP OPERATING
CORRECTLY AND/OR CAUSE INJURY!

1. Introduction
Congratulations on your purchase of the AquaDrop waterslide from WhiteWater West Industries. The AquaDrop, is an advanced slide involving electro-mechanical control and requires special attention. Please read this maintenance manual carefully before operating your new slide. This manual includes important instructions required to maintain safe operation of the AquaDrop slide.
253
6 ENSURE THAT THE OPERATIONS KEY IS REMOVED

BEFORE PERFORMING ANY MAINTENANCE ON THIS
SLIDE!

2. Mechanical
There are several mechanical components on the AquaDrop that require maintenance and/or monitoring to ensure the safety of the slide.

Prior to any maintenance, ensure the trapdoor is down (open) and the Operations Key is removed from the “RCC1” panel. All checks should be performed in accordance with this maintenance manual and should be documented for your records.

2.1. Removing Launch Shroud
The shroud is a protective and aesthetic cover that surrounds the base of the launch.

Removal of the shroud is necessary to perform certain maintenance tasks on the trapdoor and other components. This section will describe how to remove the launch shroud.

Figure 1: Shroud Installed Figure 2: Shroud Removed
Maintenance Procedure: Removing Launch Shroud
Equipment: Two people are required
Materials: -
Frequency: As required
254
7 Procedure: 1. With one person on each side, carefully lift the shroud from the AquaDrop using the handles
provided.

2. Place the shroud flat on the deck, clear of the
immediate workspace.

3. Replace the shroud when maintenance is complete.
255
8 UPPER
PANEL
LOWER
PANEL

2.2. Access Panels
There are two access panels located at the back of the launch which provide access to certain mechanical, electrical and pneumatic components. Removal of these panels is necessary to perform certain maintenance tasks. This section will describe how to remove these access panels.

Figure 3: Access Panels
Maintenance Procedure: Removing Access Panels
Equipment: None
Materials: -
Frequency: As required
Procedure: 1. Unscrew the four thumb screws from the panel you wish to remove. Be careful not to lose the screws.

2. Carefully remove the panel and set it on the ground
with the finished side facing up.

3. Replace the panel when the maintenance is
complete.
256
9 DO NOT STAND ON THE TRAPDOOR WHILE
PERFORMING ANY MAINTENANCE ACTIVITIES!

2.3. Trapdoor Assembly
The trapdoor assembly is a critical component of the slide that requires regular inspection and maintenance.

Figure 4: Trapdoor Assembly

2.3.1. Releasing the Trapdoor for Maintenance
Certain maintenance activities require that the trapdoor be released and placed in the open position. This section will describe how to release the trapdoor.

Maintenance Procedure: Releasing the Trapdoor for Maintenance Equipment: Aluminum framing square
Materials: -
Frequency: As required
257
10 Procedure: 1. Remove Operations key from the “RCC1” panel and turn off the air at the regulator. Refer to Section

3.1.1 for the location of the air regulator.

2. Observe proper lockout-tagout (LOTO) procedures.

3. Insert a framing square into the gap between the
trapdoor and the launch capsule. See Figure 43.

4. Use the framing square to lever forward the roller bar and
release the trapdoor.
258
11 2.3.2. Accessing the Trapdoor for Maintenance
The trapdoor requires periodic inspection and maintenance, and full access to the trapdoor is required to perform these tasks. This section will describe how to access the trapdoor to perform maintenance tasks.

Maintenance
Procedure:

Accessing the Trapdoor for Maintenance
Equipment: Two people are required
Materials: -
Frequency: As required
Procedure:

TRAPDOOR READY
FOR

MAINTENANCE

1. Remove Operations Key from the “RCC1” panel and turn off the air at the regulator. Refer to 3.1.1 for the location of the air regulator.

2. Observe proper lockout-tagout (LOTO) procedures.

3. Remove the shroud as per Section 2.1

4. If the trapdoor is open, proceed to the next step,
otherwise release the trapdoor as per Section 2.3.1.

5. Release the clamps on both sides of the trapdoor
assembly.

6. With one person on each side of the trapdoor, slowly pull the trapdoor upwards using the handles. Use your free
hand to move the trapdoor so that the rubber bumpers
rest on top of the fiberglass.

7. DO NOT unfold the trapdoor assembly, as shown below.

This will result in damage to the trapdoor.
259
12 2.3.3. Returning the Trapdoor after Maintenance
If the trapdoor has been removed from the slide to perform certain maintenance tasks, it will need to be returned to the slide prior to operating the slide. This section will describe how to return the trapdoor to the slide.

Maintenance Procedure: Returning the Trapdoor after Maintenance Equipment: Two people are required
Materials: -
Frequency: As required
Procedure:

DO NOT

SLAM THE
TRAPDO

1. With one person on each side of the trapdoor, use
one hand to grab the handle on the trapdoor plate
and use the other hand to support the bottom of the
trapdoor.

2. Slowly lift the trapdoor plate and guide the bottom of the
OR! trapdoor into the opening in the launch.

3. Once the trapdoor is fit into the opening, slowly lower the
trapdoor until the plate rests on the fiberglass.

Watch that your hands and feet are clear of the
trapdoor as you lower it and DO NOT slam the
trapdoor.

4. Engage the clamps on both sides of the
trapdoor
assembly.

DO NOT

UNFOLD THE
TRAPDOOR.

THIS WILL

RESULT IN
DAMAGE!
260
13 2.3.4. Trapdoor Panel Inspection
The trapdoor panel is a critical part of the trapdoor assembly and is what the rider stands on prior to being dropped into the slide. Periodic inspection of the trapdoor is required to ensure safe operation of the slide.
261
14 Figure 5: Trapdoor Panel
Maintenance Procedure: Trapdoor Inspection
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1. Prepare the trapdoor for maintenance access as per Section 2.3.2.

2. Visually inspect the trapdoor for cracks or any other damage.

3. If the trapdoor is damaged in any way, DO NOT
operate the slide until repairs are completed by
authorized personnel.

2.3.5. Cleaning the Trapdoor Panel
The trapdoor panel requires periodic cleaning to prevent material buildup and to maintain its appearance. This section will describe the cleaning procedure.

Maintenance Procedure: Cleaning the Trapdoor Panel
Equipment: Soft, lint free cloth, solution of mild detergent, chamois Materials: -
Frequency: Daily
Procedure: 1. Prepare the trapdoor for maintenance access as per Section 2.3.2.

2. Clean the top and bottom surfaces of the trapdoor
panel with a mild solution of soap or detergent and
lukewarm water.

3. Use a soft cloth or sponge to gently loosen any dirt or debris and rinse well with water.

4. A chamois or cellulose sponge may be used to dry
the
trapdoor.
348115

ASSY, PANEL,

TRAPDOOR
262
15 379989

ASSY, ROLLER
BAR

2.3.6. Roller Bar Inspection
The roller bar is a critical component of the trapdoor mechanism and must be removed annually and subjected to dye penetrant inspection, as per ASTM E1417/E1417M, to inspect the part for cracks. This section will describe how to remove and inspect the roller bar.

Figure 6: Roller Bar Detail
Maintenance Procedure: Roller Bar Inspection
Equipment: Retaining ring pliers
Materials: -
Frequency: Annually
Procedure: 1. Prepare the trapdoor for maintenance access as per Section 2.3.2.

2. Use the pliers to remove the retaining ring from the pin through the roller bar and pillow block. Remove
the pin and washers. Repeat on other side.
263
16 3. Use the pliers to remove the retaining ring from
the pin through the roller bar and push rod
connector. Remove pin and washers.

4. Remove the track rollers from roller bar assembly.

5. Have the roller bar inspected for cracks as per
ASTM E1417/E1417M dye penetrate testing
procedures.

6. If the roller bar is found to be free of cracks,
reassemble the roller bar and trapdoor
assembly.

7. If the roller bar is found to contain cracks, DO NOT OPERATE the slide until repairs are completed by
264
17 authorized personnel. Please retain the damaged roller bar for inspection by WhiteWater personnel.
265
18 379833

SET SCREW, HEX

SOCKET HEAD,

HALF DOG POINT,
1/4-28 UNF-3A X 3/16
LG
379987

ROLLER,
TRACK

2.3.7. Rollers
The trapdoor has a set of two rollers which are vital components of the trapdoor release mechanism. The rollers are used to lock the trapdoor in both the open and closed positions.

2.3.7.1. Insp
ectio
n of
Rolle
rs
Figure 7: Roller Detail
Daily inspection of the rollers is required to ensure reliable operation of the trapdoor.

This section will describe how to inspect the rollers.

Maintenance Procedure: Inspection of Rollers
Equipment: Imperial Allen keys
Materials: -
Frequency: Daily
Procedure: 1. Visually inspect each roller for debris and corrosion.

The inside face of the roller must be flush against the end of the roller bar and no threads should be visible.

2. Turn each roller by hand and ensure that they rotate smoothly without binding

3. Verify that each set screw is in place and secure (two per side).

4. If a roller is loose, damaged, seized or excessively corroded,
replace it as per Section 2.3.7.2.

2.3.7.2. Replacement of Rollers
Due to physical and environmental conditions, the rollers require periodic replacement.

This section will describe how to replace the rollers.
266
19 334849
BUMPE
R
Maintenance Procedure: Replacement of Rollers
Equipment: Imperial Allen keys
Torque wrench
Materials: 379987-ROLLER, TRACK, QTY = 2
379833-SET SCREW, QTY = 4
Thread degreaser
Loctite 7649 Primer N
Loctite 242 (blue)
Frequency: Annually or as required
Procedure: 1. Loosen and remove the set screws which hold the roller in place and discard.

2. Unscrew and remove the old roller from the roller bar and discard.

3. Degrease the threads of the new track roller and
prime with Loctite 7649 Primer N. Apply Loctite 242
(blue) to threads of track roller and torque to 20 N-m
(175 in-lb.)

4. Replace the set screws with new ones, applying
Loctite 242 (blue) to the threads. Torque set screws
to 5.5 N-m (50 in-lb.)

2.3.8. Bumpers
Rubber bumpers are used to absorb the impact energy when the trapdoor opens during operation.

2.3.8.1. Inspec
tion of
Bump
ers
Figure 8: Bumper Detail
Periodic inspection of the bumpers is required to ensure correct operation of the trapdoor. This section will describe how to inspect the bumpers.

Maintenance Procedure: Inspection of Bumpers
267
20 Equipment: -
Materials: -
Frequency: Weekly
Procedure: 1. Visually inspect each bumper for cracks and signs of material degradation.

2. If the bumper is cracked or has become brittle,
replace
the bumper as per Section 2.3.8.2.

2.3.8.2. Replacement of Rubber Bumpers
Due to physical and environmental conditions, the bumpers may require replacement.

This section will describe how to replace the bumpers.
268
21 Maintenance Procedure: Replacement of Rubber Bumpers Equipment: Imperial Allen keys
Imperial wrenches
Torque wrench
Materials: 334849-BUMPER, QTY = 2
Loctite 242 (blue)
Frequency: As required
Procedure: 1. Remove and discard the locknut which secures the bumper.

2. Remove and discard the old bumper.

3. Replace the old bumper with a new one and fasten
in place using a new locknut. Apply Loctite 242
(blue) to threads.

4. Torque the locknut to 14 N-m (10 ft-lb)

2.3.9. Retaining Ring Inspection
The retaining rings in the trapdoor assembly are used to secure several key components. Periodic inspection of the retaining rings is required to ensure safe operation of the trapdoor. This section will describe the inspection procedure for the retaining rings.

Maintenance Procedure: Retaining Ring Inspection
Equipment: Retaining ring pliers
Materials: -
Frequency: Daily
Procedure: 1. Prepare the trapdoor for maintenance access as per Section 2.3.2.

2. All retaining rings must be securely seated with the groove of their respective pin.

3. Visually inspect the retaining ring that secures one side of the roller bar to one of the pillow blocks.

Repeat on the other pillow block.
269
22 4. Visually inspect the retaining ring that secures the pushrod to the pushrod connector, and the retaining ring that secures the pushrod connector to the roller bar.

5. Visually inspect the retaining ring that secures the rod end to the cylinder clevis. Also check the security wire that is fed through the head of the bolt that fastens the clevis to the drop cylinder.
270
23 340097-01 & -02

ROLLER PLATE, LH & RH

2.3.10. Roller Plate Inspection
The roller plates are used to support the trapdoor in the closed position. Periodic inspection of the roller plates is required to ensure safe and reliable trapdoor operation.

This section will describe how to inspect the roller plates.

Figure 9: Roller Plate Location Figure 10: Roller Plate Location Detail

6. If any retaining rings are missing, DO NOT OPERATE
the slide until they have been replaced.
271
24 340090
TRAP
PLATE
Maintenance Procedure: Roller Plate Inspection
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Disengage the entry door as per Section 2.4.3.

4. Wearing appropriate fall protection gear, open the
entry door and inspect the roller plates for wear,
debris, or corrosion.

5. Replace the roller plates as required.

2.3.11. Trap Inspection
The traps are used to lock the trapdoor in the open position after a rider has been launched. Periodic inspection of the traps is required to ensure safe and reliable trapdoor operation. This section will describe how to inspect the traps.

Figure 11: Trap Location Figure 12: Trap Location Detail Maintenance Procedure: Trap Inspection
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1. Remove the shroud as per Section 2.1.

2. Look through the holes on the side of the launch
and inspect the traps for signs of wear or
degradation.

3. Replace the traps as required.
272
25 341880
HINGE

2.3.12. Hinge Inspection
The hinges allow the trapdoor assembly to be manipulated for maintenance access. Periodic inspection of the hinges is required. This section will describe how to inspect the hinges. Note that the location and type of hinge(s) may vary depending on your installation.

Figure 13: Hinge Locations
Maintenance Procedure: Hinge Inspection
Equipment: Imperial wrenches
Torque wrench
Materials: Lithium grease
Loctite 242 (blue)
Frequency: Weekly
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Lubricate the hinge(s) using lithium grease.

4. Inspect the locknuts that secure the hinge(s) and
verify that none are loose.

5. If a locknut is found to be loose, replace it with a new one. Apply Loctite 242 (blue) to threads and torque
to 20 N-m
(15 ft-lb).

2.3.13. Rubber Coupler Inspection
The rubber coupler provides the torque connection between the rotary actuator and the trapdoor. Periodic inspection of the coupler is required. This section will describe how to inspect the coupler.
273
26 Figure 14: Rubber Coupler
Maintenance Procedure: Rubber Coupler Inspection
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Carefully inspect the rubber coupler for signs of
wear or degradation.

4. Replace coupler as required.
335214
RUBBER

COUPLER
334821
ROTARY

ACTUATOR
274
27 334830
CLEVIS
337626
ROD
EYE
359370
PUSHRO
D
360986
CLEVIS
PIN

2.3.14. Pushrod Linkage
The pushrod linkage is responsible for converting the linear motion of the drop cylinder into the rotational motion of the roller bar assembly. When the drop cylinder is retracted, the roller bar rotates backwards towards the drop cylinder; releasing the trapdoor from its supports and dispatching a rider into the slide.

When the trapdoor swings back into the up and locked position, an internal spring within the drop cylinder provides a positive force to push the roller bar forward into the locked position.

Figure 15: Pushrod Linkage, Overview
Figure 16: Pushrod Linkage, Drop Cylinder Side
275
28 Figure 17: Pushrod Linkage, Roller Bar Side

2.3.14.1. Inspecting the Pushrod Linkage
During normal operating conditions, the roller bar should be firmly pressed against the pillow blocks due to the spring force from the drop cylinder. However, over time, the pushrod linkage may become worn, resulting in a loose connection between the drop cylinder and the roller bar. Too much play in this linkage may result in unreliable operation of the trapdoor. The following procedure will describe how to inspect the pushrod linkage.

Maintenance Procedure: Inspecting the Pushrod Linkage
Equipment: Imperial wrenches
Retaining ring pliers
Materials: -
Frequency: Weekly
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per Section

2.3.2. 3. Turn off the air supply as per Section 3.1.4. Follow proper LOTO procedures.

4. With your hand, gently pull back on the roller bar. If you can move the roller bar away from the face of the
pillow block by more than 3 mm (1/8”) without
overcoming the spring force from the drop cylinder,
then the pushrod linkage is
either improperly adjusting or excessively worn.
359370
PUSHRO
D
376554
ASSY,

PUSHROD

CONNECTOR
276
29 2.3.14.2. Adjusting the Pushrod Linkage
Over time the pushrod linkage may become loose and will require adjustment. The following procedure will describe how to adjust the pushrod linkage.

Maintenance Procedure: Adjusting the Pushrod Linkage
Equipment: Imperial wrenches
Retaining ring pliers
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per Section

2.3.2. 3. Turn off the air supply as per Section 3.1.4. Follow proper LOTO procedures.

4. Use pliers to remove the retaining ring from the clevis pin and pull the clevis pin out to disengage the cylinder from the linkage.

5. Loosen the nut between the rod eye and the pushrod.

6. Adjust the depth of the rod eye within the pushrod. The PILLOW
BLOCK
ROLLER
BAR

ROLLER BAR MUST BE

FIRMLY PRESSED

AGAINST PILLOW
BLOCKS

5. Inspect the pin holes of the pushrod, pushrod connector, roller bar, rod eye and clevis for signs of wear. If excessive wear is observed; i.e. holes have become oval shaped, then the affected parts must be replaced.

6. After all affected parts have been replaced, adjust the pushrod linkage as per Section 2.3.14.2.

7. If no other maintenance is required, lower the trapdoor back into the AquaDrop as per Section 2.3.3.

8. Turn on the air supply.

9. Perform the framing square test as per 4.4.7 to ensure correct adjust of the proximity sensors.

10. Replace the shroud.
277
30 rod eye must be adjusted such that when the roller bar is firmly
278
31 pressed against the face of the pillow blocks, the drop cylinder is compressed/pre-loaded 3-5 mm (1/8 - 3/16”).

CYLINDER MUST BE
COMPRESSED 3-5 mm

WHEN CONNECTED TO

ROLLER BAR
PILLOW
BLOCK
ROLLER
BAR

ROLLER BAR

FIRMLY AGAINST

PILLOW BLOCKS

7. Once the pushrod length is properly adjusted, tighten the nut on the rod eye. Apply Loctite 242 (blue) to the threads of the rod eye and nut before tightening.

8. If no other maintenance is required, lower the trapdoor back into the AquaDrop as per Section 2.3.3.

9. Turn on the air supply.

10. Perform the framing square test as per Section Error! Reference source not found. to ensure correct adjust of the proximity sensors.

11. Replace the shroud.
279
32 334266

SENSOR, MALE,
SAFETY
379196

ASSY, ACTUATOR,
LINEAR
354112

ASSY, CANOPY, ENTRY
DOOR
334318

SENSOR, FEMALE,
SAFETY

2.4. Entry Door Assembly
The entry door is a mechanically actuated door which is responsible for allowing riders to enter the launch capsule. The primary components of the entry door assembly are shown below.

Figure 18: Entry Door Assembly, Front View
280
33 2.4.1. E
n
t
r
y
D
o
o
r
I
n
s
p
e
c
tion
355141

RELEASE
PIN
355409
“JBDOOR”
PANEL
281
34 Figure 19: Entry Door Assembly, Rear View
The entry door requires periodic inspection to check for cracks and damage. This section will describe the inspection procedure.

Maintenance Procedure: Entry Door Inspection
Equipment: -
Materials: -
Frequency: Daily
Procedure: 1. Visually inspect the entire entry door for signs of damage, including chips and cracks.

2. If any cracks are found in the door, immediately
stop operation of the slide and contact WhiteWater.
282
35 2.4.2. Cleaning the Entry Door Acrylic
The entry door acrylic requires periodic cleaning to prevent material buildup from occurring and to maintain its appearance. This section will describe the cleaning procedure.

Maintenance Procedure: Cleaning the Entry Door Acrylic
Equipment: Soft, lint free cloth, solution of mild detergent, chamois Materials: -
Frequency: Daily
Procedure: 1. Remove the Operations Key from the “RCC1” panel as per Section 4.2.1.

2. Turn off the air supply as per Section 3.1.4. Follow proper LOTO procedures.

3. Disengage the entry door as per Section 2.4.3.

4. Clean the interior and exterior of the acrylic entry door with a mild solution of soap or detergent and
lukewarm water.

5. Use a soft cloth or sponge to gently loosen any dirt or debris and rinse well with water.

6. A chamois or cellulose sponge may be used to dry
the acrylic.
283
36 DO NOT OPERATE THE ENTRY DOOR MANUALLY
DURING NORMAL OPERATIONS! THIS WILL

BYPASS THE SAFETY SYSTEM AND MAY RESULT
IN INJURY TO THE RIDER!
355141

RELEASE
PIN
379196

ASSY, ACTUATOR,
LINEAR
354286

LINKAGE
BAR

2.4.3. Disengaging the Entry Door for Maintenance/Emergency Release
Certain maintenance and operational procedures require the entry door to be opened manually. This section will describe how to open the door manually.

Figure 20: Entry Door, Linear Actuator Assembly
Maintenance Procedure: Disengaging the Entry Door for
Maintenance/Emergency Release
Equipment: Step ladder
Materials: -
Frequency: As required
Procedure: 1. Secure all personnel against falling when working around the flume opening, in accordance with local
workplace safety regulations.

2. Remove the Operations Key from the “RCC1” panel
as per Section 4.2.1.

3. Remove the upper access panel from the back of
the launch capsule.
284
37 DO NOT OPERATE THE ENTRY DOOR MANUALLY
DURING NORMAL OPERATIONS! THIS WILL

BYPASS THE SAFETY SYSTEM AND MAY RESULT
IN INJURY TO THE RIDER!

2.4.4. Re-engaging the Entry Door for Normal Operations If the entry door has been disengaged to perform certain maintenance and operational procedures, it will need to be re-engaged to resume normal operations.

This section will describe how to re-engage the entry door.

Maintenance Procedure: Re-engaging the Entry Door for Normal Operations Equipment: Step ladder
Materials: -
Frequency: As required
Procedure: 1. Ensure the Operations Key is removed from the “RCC1” panel.

2. Ensure the switch on the “JBDOOR” panel is in the
OFF position.

3. Insert the release pin through the linkage bar and the end of the linear actuator. Push the pin all the way
down through the bottom of the linkage bar.

4. Turn the switch on the “JBDOOR” panel to the ON
position.

5. Replace the upper access panel to the back of the
launch.

6. Return the Operations Key to the “RCC1” panel.

4. Turn the switch on the “JBDOOR” panel to the
OFF position.

5. Use a small step ladder, if needed, to pull up on and remove the release pin connecting the linkage bar and
linear actuator. Note: If the pin is stuck you will need to push the door forward slightly to remove the load from
the linkage.

6. The door is now free to open and close without
power.
285
38 354113
HINGE

2.4.6. Entry Door Hinge Inspection
The entry door is attached to the fiberglass launch capsule with a piano hinge. Periodic inspection of the hinges and fasteners is required. This section will describe how to inspect and tighten the hinge bolts.

Figure 21: Entry Door Hinge
Maintenance Procedure: Entry Door Hinge Inspection
Equipment: Imperial Allen keys
Imperial wrenches
Torque wrench
Materials: -
Frequency: Weekly
Procedure: 1. Visually inspect the hinge and ensure that it’s securely attached to the launch capsule and entry
door.

2. Tighten any loose bolts to 13 N-m (10 ft-lb), but do not over tighten as this may damage the acrylic
door.

3. Wipe the hinge with a lint free cloth and water to
remove any buildup, dirt or debris and rinse with
water.
286
39 356436

ASSY, LINKAGE
ROD
379196

ASSY, ACTUATOR,
LINEAR
354670
ANGLE

BRACKET
356436

ASSY, LINKAGE
ROD

2.4.7. Replacing the Linear Actuator
The linear actuator is used to provide mechanical force to open and close the entry door. In the event that the actuator fails, it will need to be removed and replaced. This section will describe how to replace the linear actuator.

Figure 22: Linear Actuator Assembly
Figure 23: Linkage Rod Detail
287
40 Maintenance Procedure: Replacing the Linear Actuator Equipment: Imperial Allen keys
Imperial wrenches
Step ladder
Materials: 379196-ASSY, ACTUATOR, LINEAR, QTY = 1
Frequency: As required
Procedure: 1. Disengage the entry door as per Section 2.4.3.

2. Disconnect the cable on the linear actuator from the “JBDOOR” panel at the back of the launch capsule.

3. Remove the shoulder bolt that connects the linear
actuator to the angle bracket and remove the
defective actuator. Be careful not to lose any
fasteners.

4. Complete the reassembly of the new linear actuator.

5. Re-engage the entry door to the linkage assembly
as per Section 2.4.4.

6. Ensure that the release pin is easy to remove when
connected to the linkage bar and linear actuator
when the linear actuator is fully retracted. If not, use a wrench on the flats of the linkage rod to adjust the
position of the door.
288
41 334266

SENSOR, MALE,
SAFETY
334318

SENSOR, FEMALE,
SAFETY

2.4.8. Replacing Safety Switch Components
The safety switch is another important feature of the safety system and is used to tell the system when the entry door is closed. The safety switch is composed of two components: the switch which is mounted within the launch capsule, and the switch actuator which is mounted to the entry door. Over time, one or both of these switch components may fail and require replacement. This section will describe how to replace both switch components.

Figure 24: Safety Switch Details
Maintenance Procedure: Replacing Safety Switch Components Equipment: Imperial Allen keys
Imperial wrenches
Materials: 334266-SENSOR, MALE, SAFETY, QTY = 1
334318-SENSOR, FEMALE, SAFETY, QTY = 1
Frequency: As required
Procedure: 1. Disengage the entry door as per Section 2.4.3.

2. To replace the male sensor, remove the cover panel
at the top of the launch. Unscrew the cable from the
sensor and remove the fasteners securing the
switch to the
mounting bracket.
289
42 3. Replace the old switch with the new one.

Connect the cable to the new switch and
secure the switch to the mounting bracket using
the fasteners.

4. Reinstall the cover panel to the top of the launch.

5. To replace the female sensor, remove the
cover panel from the top of the entry door.

Remove the fasteners which secure the sensor
to the mounting bracket.

6. Replace the sensor with the new one and
secure it to the mounting bracket using the
fasteners.

7. Reinstall the cover panel to the top of the entry
door.

8. Verify that the light on the switch is green when
the door is closed and red when the door is
open.
290
43 COMPRESSOR AIR

PRESSURE
> 689 kPa [100 psi]

DRY AIR IS REQUIRED

TO PROVIDE SAFE AND

RELIABLE OPERATION

OF PNEUMATIC

COMPONENTS

3. Pneumatics
The AquaDrop uses compressed air and various pneumatic components for the majority of its automated movements. A compressor must be installed in order to supply the AquaDrop with the air pressure required for operation. The pressure setting on the compressor should be above the operating pressure of the AquaDrop.

Figure 25: Location of Pneumatic Components Figure 26: Detail View of Pneumatic Components 291
44 345183

AIR PREPARATION
UNIT
345184

PRESSURE

REGULATOR

3.1. Air Supply

3.1.1. A
i
r
P
r
e
p
a
r
a
t
i
o
n
U
n
i
t
Figure 27: Detail View of Pneumatic Components
An air preparation unit, as shown below, is used to filter and regulate the air supplied to various pneumatic components. This unit regulates the air pressure supplied to the drop cylinder components and must not exceed 689 kPa [100 psi]. 292
45 MAX AIR PRESSURE
689 kPa [100 psi]
293
46 MAX AIR PRESSURE
552 kPa [80 psi]
345184

PRESSURE

REGULATOR
Figure 28: Air Preparation Unit

3.1.2. Pressure Regulator for Rotary Actuator
An additional pressure regulator is provided downstream of the air preparation unit to regulate the pressure supplied to the rotary actuator. This pressure must not exceed 552 kPa [80 psi].

Figure 29: Pressure Regulator for Rotary Actuator
ON/OFF
VALVE

PRESSURE

CONTROL
VALVE
345183

AIR PREPARATION
UNIT
380188
FILTER

CARTRIDGE

PRESSURE GAUGE
294
47 346086

FLOW CONTROL
VALVE

3.1.3. Flow Control Valve for Drop Cylinder
A flow control valve is located between the two solenoid valves used to actuate the drop cylinder. The purpose of this valve to regulate the air flow into the drop cylinder, allowing the trapdoor to drop at the minimum required pressure for the given rider weight.

The valve is factory set to successfully launch the maximum rider weight; however, the opening may be adjusted to account for various external factors.

Figure 30: Trapdoor Assembly-Pneumatic Components

3.1.4. T
u
r
n
i
n
g
o
f
f
Air Supply
295
48 Figure 31: Flow Control Valve
When performing maintenance operations it is important to shut off the air supply to prevent accidental pneumatic actuator movement. This section will describe how to turn off the air supply.

Maintenance Procedure: Turning off Air Supply
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Remove the lower access panel from the back of the launch.

2. Turn the on/off valve on the air preparation
unit
counterclockwise.
296
49 DO NOT EXCEED THE

MAXIMUM AIR
PRESSURE!

3.1.5. Adjusting Unit Air Pressure
If the air pressure is set incorrectly, the trapdoor may bang loudly when released, fail to catch in the traps, or may fail to launch riders near the upper weight limit. This section will describe how to adjust the air pressure.

Maintenance Procedure: Adjusting Unit Air Pressure
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Remove the lower access panel from the back of the launch.

2. Adjust the pressure regulator supplying the rotary
actuator to the lowest air pressure at which the
trapdoor will open in one swing and close in one
swing.

3. Turn the pressure control valve clockwise to
increase the air pressure or counterclockwise to
decrease the air pressure. The air pressure is
displayed on the pressure
gauge.

3.1.6. Replacing Filter
Periodically, the filter in the air preparation unit will need to be replaced. This section will describe how to replace the filter.

Maintenance Procedure: Replacing Filter
Equipment: -
Materials: 380188-FILTER CARTRIDGE, QTY = 1
Frequency: Annually

3. You will hear air discharge and the pressure
gauge will read 0 kPa [0 psi].
297
50 Procedure: 1. Remove the lower access panel from the back of the launch.

2. Turn off the air supply as per Section 3.1.4. Follow proper LOTO procedures.

3. Turn the filter counterclockwise to remove it.

4. Replace the air filter and turn clockwise until it is tight.

5. Turn on the air supply.
298
51 342044

SOLENOID
VALVE

3.2. Solenoid Valves
Solenoid valves are used on the trapdoor assembly to control the motion of the rotary actuator and the drop cylinder.

Figure 32: Trapdoor Assembly-Pneumatic Components

3.2.1. Replacing a Solenoid Valve
If a solenoid operated directional control valve begins to leak or stops working it will be necessary to replace it. This section will describe how to replace a solenoid valve.

Figure 33: Solenoid Valve Detail
Maintenance Procedure: Replacing a Solenoid Valve
Equipment: Philips head screw driver
Materials: Loctite Marine Grade Anti-Seize
Frequency: Annually, or as required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.
299
52 334821
ROTARY

ACTUATOR
370048

ASSY, PROXIMITY

SENSOR &

CONNECTOR
348134

ASSY, PLUG SOCKET
& 3 PIN CORDSET

3.3. Rotary Actuator
The rotary actuator is used to energize the trapdoor while it’s swinging to ensure it has sufficient momentum to reach the traps and lock in place.

Figure 34: Rotary Actuator Components

3.3.1. Rotary Actuator Replacement
Overtime, the actuator may fail and require replacement. This section will describe how to replace the rotary actuator.

Maintenance Procedure: Replacing the Rotary Actuator
Equipment: Imperial Wrenches
Imperial & Metric Allen keys
Torque wrench
Materials: 334821-ROTARY ACTUATOR, QTY = 1
Loctite Marine Grade Anti-Seize
Loctite 242 (blue)

6. Turn off the air supply as per Section Error! Reference source not found.. Follow proper LOTO procedures.

3. Disconnect the push-to-connect fittings and
unscrew the signal cable from the defective
valve.

4. Remove the two screws from the defective
solenoid valve.

5. Replace the push-to-connect fittings and signal
cable on the new solenoid valve. Ensure that
they are in the same locations as they were
originally.

6. Screw the solenoid valve back in place. Apply
Loctite marine grade anti-seize to threads.
300
53 Frequency: As required
301
54 Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per Section

2.3.2. 7. Turn off the air supply as per Section Error! Reference source not found.. Follow proper LOTO procedures.

3. Disconnect the two push-to-connect fittings, unplug the electrical connector, and remove the proximity sensor.

4. Unscrew the two bolts that fasten the clevis foot to the trapdoor mount plate and unscrew the two bolts that
secure the hinge to the trapdoor panel.
334897

CLEVIS FOOT
337814

TRAPDOOR HINGE

5. Remove the clevisfoot and hinge from the shaft.

6. Unscrew the four bolts that secure the sheet coupler to the mounting plate.
302
55 335214

SHEET COUPLER

7. Unscrew the four bolts that secure the rotary actuator flange to the trapdoor hinge and unscrew the bolt that
secures the rotary actuator flange to the rotary actuator shaft.
337814

TRAPDOOR HINGE
334820

ACTUATOR FLANGE

8. Unscrew the two bolts that fasten the rotary actuator to the sheet coupler and remove the defective actuator.

9. Ensure that the stopper (with the sensor) on the new rotary actuator is rotated, such that it does not contact the moving/rotating arm when the trapdoor is closed.

Torque to 38 N-m (28 ft-lb).
303
56 TRAPDOOR CLOSED

10. Ensure that the stopper (without the sensor) is rotated such that it does not contact the moving/rotating arm
when the trapdoor is open. Torque to 38 N-m (28 ft-lb).

TRAPDOOR OPEN

11. Replace the old rotary actuator with the new one and reassemble as per the following instructions.

12. Fasten the new actuator to the sheet coupler. Apply Loctite 242 (blue) to the fasteners and torque to 14 N-m (10 ft-lb).

13. Fasten the flange to the hinge and slide the flange on the rotary actuator shaft. Apply Loctite 242 (blue) to the
fasteners and torque to 14 N-m (10 ft-lb).
304
57 14. Fasten the hinge to the trapdoor panel. Apply Loctite 242 (blue) to the fasteners and torque to 14 N-m (10 ft-lb).

DO NOT OVERTIGHTEN! This may crack the trapdoor
panel.

15. Slide the clevis foot and hinge on the pin and fasten the clevis foot. Apply Loctite 242 (blue) to the fasteners and torque to 20 N-m (15 ft-lb).

16. Fasten the hinge to the trapdoor panel. Apply Loctite 242 (blue) to the fasteners and torque to 14 N-m (10 ft-lb).

DO NOT OVERTIGHTEN! This may crack the trapdoor
panel.
305
58 17. If no other maintenance is required, lower the trapdoor back into the AquaDrop.

18. Turn on the air supply.

19. Replace the shroud.
306
59 334837

PROXIMITY
SENSOR
334832

TRAPDOOR
HINGE
334835
DROP

CYLINDER
378509

RETAINING
RING
334347

SECURITY
WIRE
360986
CLEVIS
PIN

3.4. Trapdoor Drop Cylinder
As the name implies, the trapdoor drop cylinder is used to disengage the locking mechanism and drop the trapdoor.

Figure 35: Drop Cylinder Overview

3.4.1. Replacing the Trapdoor Drop Cylinder
Over time, the cylinder may fail and require replacement. This section will describe how to replace the trapdoor drop cylinder.

Maintenance Procedure: Replacing the Trapdoor Drop Cylinder Equipment: Imperial wrenches
Imperial and Metric Allen keys
Retaining ring pliers
Torque wrench
Materials: 334835-DROP CYLINDER
334347-SECURITY WIRE
Loctite 242 (blue)
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Turn off the air supply as per Section Error!
Reference source not found.. Follow proper
LOTO procedures.

4. Disconnect the push-to-connect fittings to remove
the proximity sensor from the defective cylinder.
307
60 5. Use pliers to remove the retaining ring from the clevis pin and pull the clevis pin out to disengage the cylinder from the linkage.

6. Unscrew the four bolts which fasten the cylinder to the trapdoor hinge.

7. Unscrew the four bolts which fasten the two mounting feet to the cylinder.

8. Remove the security wire from the bolt head and
unscrew the bolt which fastens the clevis to the end of the cylinder.

9. Replace the defective cylinder with the new one and
reassemble as per the following instructions.

10. Fasten the clevis to the drop cylinder. Clean the screw hole with acetone and use permanent Loctite 262 (red).

Torque to 24 N-m (18 ft-lb).

11. Replace the security wire with a new one, feed it through the bolt head and twist the ends.
308
61 12. Fasten the four bolts which fasten the two mounting feet to the cylinder. Apply Loctite 242 (blue) to the threads.

Torque to 24 N-m (18 ft-lb).

13. Fasten the four bolts which secure the cylinder to the trapdoor hinge. Apply Loctite 242 (blue) to the threads.

Torque to 24 N-m (18 ft-lb).

14. Adjust the pushrod linkage as per Section 2.3.14.2.

15. Insert the clevis pin through the clevis and rod eye. Use retaining ring pliers to install the retaining ring onto the clevis pin.

16. Reconnect the air line and install the proximity sensor.

17. If no other maintenance is required, lower the trapdoor back into the AquaDrop.

18. Turn on the air supply.

19. Perform the framing square test as per Section 4.4.7 to ensure correct adjust of the proximity sensor.

20. Replace the shroud.
309
62 DUE TO ELECTRICAL HAZARDS, ONLY

AUTHORIZED PERSONNEL ARE PERMITTED TO
PERFORM ELECTRCIAL WORK!

BATTERY
BACKUP
UNIT

CIRCUIT BREAKER
FOR AC

VOLTAGE

CIRCUIT BREAKER
FOR DC

VOLTAGE
24 VDC
POWER
SUPPLY
MANUAL
SWITCH
115V / 230V

4. Electrical

4.1. “PCC1” Panel
The “PCC1” panel is the main power center for the slide. Supply voltage from the site is fed into the panel and 24 VDC is output from the power supply and is fed to the “RCC1” panel. The power supply has a manual switch and is suitable for 100-250 VAC, 50-60 Hz input. The panel also features a battery backup unit to temporarily supply power to the slide in the event of a power outage.

4.2. “R
C
C
1 ”
P
a
n
el
Figure 36: “PCC1” Panel
The “RCC1” panel is the primary slide control console for the operator and is located on 310
63 the tower near the entry to the launch capsule. This panel features the main power key switch, trapdoor and entry door control pushbuttons, an alarm indicator lamp, and an emergency stop pushbutton. There is also a window to view the error codes displayed on the PLC, as well as a lamacoid label to describe each of the error codes. 311
64 4.2.1. Remo
ving
the
Oper
ation
s Key
Figure 37: “RCC1” Panel
It is an important safety measure to remove the Operations Key prior to performing any maintenance activities on the slide. This section will describe how to remove the Operations Key from the “RCC1” panel.

Maintenance Procedure: Removing the Operations Key
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Go to the “RCC1” panel and turn the key
counterclockwise.

2. Remove the key and store in a safe place while
performing maintenance.

3. Return the key to the “RCC1” panel after the
maintenance is complete if slide operations are to
continue, otherwise store the Operations Key in a
safe
place until slide operations commence.

4.2.2. Turning the Slide ON
The slide is turned on by inserting the Operations Key into the key switch on the “RCC1” panel and turning it clockwise.

Maintenance Procedure: Turning the Slide ON
312
65 Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Go to the “RCC1” panel and insert the Operations Key into
the key switch.
313
66 TURNING THE SLIDE OFF USING THE

OPERATIONS KEY DOES NOT SHUT THE POWER
OFF!

4.2.3. Turning the Slide OFF
At the end of the day the slide is shut down by turning the Operations Key in the “RCC1” panel counterclockwise and removing it from the panel. Store the Operations Key in a safe place. The power to the “RCC1” panel will remain ON but the slide cannot be operated without the operations key.

Maintenance Procedure: Turning the Slide OFF
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Go to the “RCC1” panel and turn the
key counterclockwise.

2. Remove the Operations Key from the “RCC1” panel
as per Section 4.2.1.

3. Store the Operations Key in a safe place.

4.2.4. Turning Power OFF to Slide
When performing certain maintenance activities it may be necessary to turn off power and de-energize the panel and various field devices. This section will describe how to turn off the power.

Maintenance Procedure: Turning the Power OFF
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Due to electrical hazards, only qualified maintenance personnel are authorized to perform
this procedure.

2. Locate the “PCC1” panel, which is typically mounted
near the base of the tower.

3. Open the “PCC1” panel and switch the two breakers
to the OFF position. This will turn off the power
to the
“RCC1” panel and all field devices.

2. Turn the key clockwise.

3. The screen on the PLC will display a UE code.

If you cannot see anything on the PLC, check
the breakers in both the “PCC1” and “RCC1”
panel.
314
67 4.2.5. Cycling Power to the PLC
Some faults cannot be cleared without cycling power to the PLC. This section will describe how to cycle the power to the PLC.

Maintenance Procedure: Cycling Power to the PLC
Equipment: -
Materials: -
Frequency: As required
Procedure: 1. Go to the “RCC1” panel and turn the
key counterclockwise.

2. Press and hold the “CLEAR” and “LAUNCH 2”
pushbuttons simultaneously for one second and
then release. The lights on the PLC should turn off
and then back on.

SWITCH

CIRCUIT

BREAKERS
OFF
315
68 344118

VOICE OUTPUT

ELEMENT
344119

CONNECTION

ELEMENT

4.3. Speaker
The speaker provides an audible countdown of “3-2-1”, once the launch buttons have been pressed. The speaker is located inside the launch capsule on the top shelf. Over time, the speaker may stop working and need to be replaced. This section will describe how to replace the speaker.

Figure 38: Speaker
Maintenance Procedure: Replacing the Speaker
Equipment: -
Materials: 344118-OUTPUT ELEMENT, SPEAKER
Frequency: As required
Procedure: 1. Disengage the entry door as per Section 2.4.3.

2. Remove the access panel within the launch capsule
at the top.

3. Rotate the voice output element counterclockwise
and remove.

4. Replace the defective voice output element with the
new one. Line up the white lines on both elements,
push in, and rotate the voice output element
clockwise to lock in place.
316
69 PRESSURE SWITCH
(1)

PROXIMITY
SENSORS (3)

4.4. Trapdoor Sensors
Proximity sensors are used in three locations within the trapdoor assembly to monitor the positon of the trapdoor; one on the rotary actuator, one on the drop cylinder, and one on the roller bar. A pressure switch is also used to detect failures of the solenoid valves used to actuate the drop cylinder. The location of these devices is shown below.

Figure 39: Trapdoor Sensor Locations
317
70 345258

SENSOR MTG

BRACKET
STOPPE
R 370048

ASSY, PROXIMITY
SENSOR
M8

CAPSCREW
AR
M

4.4.1. Adjusting Rotary Actuator Proximity Sensor
When the trapdoor is in the closed position, the proximity sensor located on the stopper should be lit. If it is not lit, then it may need to be adjusted. This section will describe how to adjust the position of the proximity sensor on the rotary actuator.

Figure 40: Rotary Actuator Details
Maintenance Procedure: Adjusting Rotary Actuator Proximity Sensor Equipment: 6mm hex Allen key
Adjustable wrench
Materials: -
Frequency: As required
Procedure: 1. The trapdoor must be in the closed and locked position.

2. Remove the Operations Key from the “RCC1” panel
as per Section 4.2.1.

3. Turn off the air supply as per Section Error!
Reference source not found. Follow proper LOTO
procedures.

4. Disengage the entry door as per Section 2.4.3 and
open the entry door.

5. Reach between the top of the trapdoor and the
door jamb and loosen the M8 cap screw on the rotary
actuator.

6. Rotate the sensor mount/stopper until the sensor
is activated, i.e. LED is lit.

7. Tighten the M8 cap screw.

8. If the sensor light will still not turn on it may be too far away from the face of the arm.

9. Prepare the trapdoor for maintenance as per
Section 2.3.2.

10. Use wrenches to loosen the nuts on the body of
318
71 the cylinder and move the sensor towards the arm
such that
319
72 334837

PROXIMITY
SENSOR

4.4.2. Replacing Rotary Actuator Proximity Sensor
If adjusting the sensor does not fix the problem, it may be necessary to replace the sensor. This section will describe how to replace the sensor.

Maintenance Procedure: Replacing Rotary Actuator Proximity Sensor Equipment: Metric wrenches
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Disconnect the end of the sensor cable from
the distribution box.

4. Use the wrenches to loosen the nuts that secure
the sensor to the mounting bracket and remove the
sensor.

5. Replace the defective sensor with a new one.

6. Adjust the sensor position as per Section 4.4.1

4.4.3. Adjusting Drop Cylinder Proximity Sensor
When the trapdoor is in the closed position, the proximity sensor located on the drop cylinder should be lit. If it is not lit, then it may need to be adjusted. This section will describe how to adjust the position of the proximity sensor on the drop cylinder.

Figure 41: Drop Cylinder Details
Maintenance Procedure: Adjusting Drop Cylinder Proximity Sensor Equipment: Small hex Allen key
Framing square
Materials: -
Frequency: As required
the face is 1-2 mm (1/32”-1/16”) from the face
of the arm.
320
73 Procedure: 1. Remove the shroud as per Section 2.1.
321
74 4.4.4. Replacing Drop Cylinder Proximity Sensor
If adjusting the drop cylinder sensor does not fix the problem then it may be necessary to replace the sensor.

Maintenance Procedure: Replacing Drop Cylinder Proximity Sensor Equipment: Small hex Allen key
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Disconnect the end of the sensor cable from
the distribution box.

4. Use the Allen key to loosen the screw on the sensor
and slide sensor out of channel.

5. Replace the defective sensor with a new one.

6. Adjust the sensor position as per Section 4.4.3.

4.4.5. Adjusting Roller Bar Proximity Sensor
When the trapdoor is in the closed position, the proximity sensor for the roller bar should be lit. If it’s not lit, then it may need to be adjusted. This section will describe how to adjust the position of the proximity sensor for the roller bar.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Ensure the roller bar is fully out at its rest
position with the drop cylinder extended, and
that nothing is impeding the free movement of
the roller bar.

4. Ensure the drop cylinder sensor is electrically
connected, and the control system is on, but
inactive, i.e. the Operations Key is removed.

5. Starting at the rear (far end from piston rod),
slide the proximity sensor forward (towards the
piston rod) until the amber light goes on.

Continue moving the sensor forward until the
light goes out. Move the sensor approximately
1mm (1/32”) back, and lightly tighten the set
screw.

6. Replace the trapdoor inside the ride as per
Section 2.3.3.

7. Close the trapdoor in the usual fashion. Ensure
the light on the drop cylinder proximity sensor is
lit.

8. Perform the framing square test as per Section

4.4.7. 9. Fully tighten the screws on the sensors.
322
75 Figure 42: Rotary Actuator Details
Maintenance Procedure: Adjusting Roller Bar Proximity Sensor Equipment: Imperial wrenches
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Ensure the roller bar is fully out at its rest position with the drop cylinder extended, and that nothing is
impeding the free movement of the roller bar.

4. Ensure the roller bar sensor is electrically
connected, and the control system is on, but
inactive, i.e. the Operations Key is removed.

5. Loosen the two bolts that fasten the sensor saddle
to the pillow block.

6. Move the sensor until it is 2 mm (1/16”) offset from the face of the roller bar in the locked position.

Ensure that the light on the sensor is lit.
376553

ASSY, PILLOW
BLOCK
334855

PROXIMITY
SENSOR
334856

SADDLE FOR
SENSOR
323
76 4.4.6. Replacing Roller Bar Proximity Sensor
If adjusting the roller bar sensor does not fix the problem then it may be necessary to replace the sensor.

Maintenance Procedure: Replacing Roller Bar Proximity Sensor Equipment: Imperial wrenches
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Disconnect the end of the sensor cable from
the distribution box.

4. Loosen the two screws on the sensor saddle and
remove the defective sensor.

5. Connect the field connector to the new sensor.

6. Replace the defective sensor with a new one.

7. Adjust the sensor position as per Section 4.4.5.

4.4.7. Framing Square Test
Proper positioning of the drop cylinder sensor and roller bar sensor is critical to both the SAFETY and the RELIABILITY of the AquaDrop ride.

The following graphics illustrate the relationship between the sensor range, the safety, and the reliability of the system.

If the drop cylinder sensor is placed too far forward on the cylinder (towards the piston rod) the ride will be UNRELIABLE but safe.

7. Tighten the two bolts that fasten the sensor
saddle to the pillow block.

8. Replace the trapdoor inside the ride as per
Section 2.3.3.

9. Close the trapdoor in the usual fashion. Ensure
the light on the roller bar proximity sensor is lit.

10. Perform the framing square test as per Section

4.4.7. 324
77 If the drop cylinder sensor is placed on the cylinder too far back (away from the piston rod) the ride will be UNSAFE, but reliable.

Obviously, proper adjustment is such that UNRELIABILITY is risked, rather than risking the ride becoming UNSAFE. This means that as the drop cylinder retracts or is compressed, the drop cylinder sensor must positively turn off (output 0V) prior to the trapdoor being unable to support a rider.

Safe and

UNRELIABLE
24 12 Sensor Output (Volts)
0 TRAPDO
OR
FALLS

TRAPDOO
R

SECUREL
Y
LOCKED
Trapdoor Falls Left of
This
Line
Max Cylinder Excursion
-12
0% 25% 50% 75% 100%

CYLINDER

EXCURSION
UNSAFE and
Reliable
24 12 Sensor Output (Volts)
0 TRAPDO
OR
FALLS
-12

TRAPDOO
R

SECUREL
Y
LOCKED
Trapdoor Falls Left of
This
Line
Max Cylinder Excursion
0% 25% 50% 75% 100%

CYLINDER

EXCURSION

SENSOR OUTPUT(VOLTS) SENSOR OUTPUT
(VOLTS)
325
78 When the trapdoor is in the closed and locked position, both the drop cylinder sensor and the roller bar sensor should be lit. The following procedure will describe how to confirm that both the drop cylinder sensor and the roller bar sensor are in the proper positions.

Maintenance Procedure: Framing Square Test– Test to Determine Proper Positioning of Drop Cylinder Sensor and Roller Bar
Sensor
Equipment: Framing square
Sensor Allen key
Materials: -
Frequency: Weekly and every time sensors are serviced, adjusted or replaced
Procedure: 1. Start with the trapdoor up (closed) and the entry door open.

2. Remove the Operations Key from the “RCC1” panel
as per Section 4.2.1.

3. Turn off the air supply as per Section 3.1.4. Follow proper LOTO procedures.

4. Secure all personnel present against falling, in
accordance with local workplace safety regulation.

5. Secure a 22 kg (50 lb.) load to the tie off anchors on the top of the launch and have it rest on the trapdoor
for the duration of this test.

6. Duck down and observe the amber lights on the
drop cylinder sensor and the roller bar sensor.

Amber light “ON” means the switch is in the “closed”
state, outputting 24V.

7. Insert the short arm of a framing square between
the roller bar and the sliding surface.

Safe and
Reliable
24 12 Sensor Output (Volts)
0 Trapdoor Falls Left of
This
Line
TRAPDO
OR
FALLS
-12

TRAPDOO
R

SECUREL
Y
LOCKED
Max Cylinder
Excursion
0% 25% 50% 75% 100%

CYLINDER

EXCURSION

SENSOR OUTPUT(VOLTS)
326
79 Figure 43: Section View Showing Framing Square being used as a Lever to Push the Roller Bar away from Sliding Surface

8. Gently lever the long arm of the framing square
up in a slow and controlled fashion, being
careful not to move the roller bar so far that the
trapdoor drops/opens.

9. Continuously observe the amber lights on the
drop cylinder sensor and the roller bar sensor.

10. The amber lights on the drop cylinder sensor
and the roller bar sensor must go OFF and the
sensor output must be 0V while the trapdoor is
still firmly locked in the closed position while
under load.

11. Release the pressure on the framing square
and observe the roller bar. It must slip back into
the fully engaged position, and the amber lights
must go ON.

12. Repeat the test ten times. Ensure there is
generous margin after the lights go out and
before the trapdoor drops. The drop cylinder
should be able to retract approximately 3mm
(1/8”) after the sensor light goes OFF and the
trapdoor must still be firmly locked in the closed
position while under load.
327
80 Figure 44: Another View showing Framing Square being used as a Lever to Push the Roller Bar away from Sliding Surface

4.4.8. Pressure Switch for Valve Failure Detection
A pressure switch is located between the two solenoid valves (V_DROP1 and V_DROP2) which release the trapdoor during the launch sequence. This pressure switch is integrated into the safety system to trigger a fault when failure of either of the two valves is detected.

Figure 45: Trapdoor Assembly-Pneumatic Components
328
81 Figure 46: Pressure Switch
Failure of the pressure switch will require it to be replaced immediately. This section will describe how to replace the pressure switch.

Maintenance Procedure: Replacing the Pressure Switch
Equipment: Wrenches
Materials: -
Frequency: As required
Procedure: 1. Remove the shroud as per Section 2.1.

2. Turn off the air supply as per Section 3.1.4.

3. Disconnect the air line from the pressure switch.

4. Disconnect the electrical cable from the pressure
switch.

5. Remove the defective pressure switch and replace it
with the new one.

6. Reconnect the air line and electrical cable to the
pressure
switch.
346089

PRESSURE
SWITCH
329
82 5. Water

5.1. Sprayer Nozzles (Flatline Loop Only)
The sprayer system is a critical component of the Flatline Loop ride. The maintenance procedures outlined below must be followed to ensure safe operation of the ride.

5.1.1. Routine Visual Inspection and Cleaning of Sprayer Nozzles The sprayer system must be cleaned and visually inspected daily to ensure all spray nozzles are delivering adequate water flow.

Maintenance Procedure: Routine Visual Inspection of Sprayers Equipment: Small screwdriver
Materials: -
Frequency: Daily
Procedure: 1. Clean the Y-strainer on the water line for the sprayers.

2. Prepare the trapdoor for maintenance as per
Section 2.3.2.

3. Disengage the entry door for maintenance as per
Section 2.4.3.

4. Secure a climbing rope safely to the hooks on top of the AquaLaunch.

5. Using a climbing harness, as per local OHSA
regulations, descend down the slide from the launch
opening.

6. Once in position at the first sprayer, have another
staff member turn the water on. Yes, you will get
wet.

7. Visually inspect all sprayers to ensure correct
operation.

8. Use a small screwdriver to remove any debris
lodged in the nozzles.

5.2. Paddle Flow Switches
As part of the safety system, the AquaDrop is equipped with two flow switches to monitor the water flow. One of the flow switches is located behind the back panel of the AquaDrop on the water line which feeds the Entry Capsule, and another flow switch is located on the water line which feeds the injectors just below the capsule. 330
83 Figure 47: Paddle Flow Switch
These flow switches may become stuck in the on or off position due to debris in the lines, or they may fail completely. This section will describe how to inspect and replace the flow switches.

Maintenance Procedure: Inspection and Replacement of Flow Switches Equipment: Wrench and screw driver
Materials: -
Frequency: As required
Procedure: 1. Turn off the water.

2. If applicable, remove the back panel as per Section

2.2. 3. Unscrew the flow switch and check the paddle for debris, and remove the debris from the paddle if
necessary.

4. Confirm that the flow switch is functioning correctly by checking the corresponding input on the PLC
within the “RCC1” panel. The input on the PLC
should cycle on and off as the paddle is cycled back
and forth.

5. If the flow switch is functioning correctly, reinstall the flow switch.

6. If the flow switch is not functioning correctly, replace it
with a new one.
355521

ASSY, FLOW SWITCH,
PADDLE
331
84 6. Preventative Maintenance
The following list outlines the various maintenance tasks required to safely and reliably operate your waterslide.

Task Dail
y
Weekly Monthly Yearl
y
Clean trapdoor panel (Section 2.3.5) ●
Inspect trapdoor panel (Section 2.3.4) ●
Inspect rollers (Section 2.3.7.1) ●
Inspect retaining rings (Section 2.3.9) ●
Inspect roller plates (Section 2.3.10) ●
Inspect traps (Section 2.3.11) ●
Inspect rubber coupler (2.3.13) ●
Inspect entry door (Section 2.4.1) ●
Clean entry door (Section 2.4.2) ●
Inspect sprayers (Section 5.1.1) ●
Inspect slide surface for chips, cracks and defects ●
Inspect metallic components for corrosion and
excessive wear
●
Inspect bumpers (Section 2.3.8.1) ●
Inspect trapdoor hinges (Section 2.3.12) ●
Inspect entry door hinge (Section 2.4.5) ●
Inspect pushrod linkage (Section 2.3.14.1) ●
Perform “Framing Square Test” on trapdoor sensors
(Section

4.4.7)
●
Inspect pneumatic tubing for air leaks ●
Inspect electrical cables for abrasion and excess strain ● Inspect electrical connectors for corrosion and water
ingress
●
Perform dye penetrant testing on roller bar (Section

2.3.6)
●
Replace rollers (Section 2.3.7.2) ●
Replace bumpers (Section 2.3.8.2) ●
Replace solenoid valves (Section 3.2.1) ●
Replace filter cartridge (Section 3.1.6) ●
332
85 6.1. End of Season Maintenance
The following is a list of recommended tasks to be performed at the end of the operating season. • Remove the trapdoor assembly from the slide and store in a warm and dry location. • Cover the “RCC1” and multi-launch (if applicable) console to protect them from weather. You do not have to remove the cables connected to the base of the panel(s) as long as they are covered, but if you do, wrap the ends of the cables to protect them. • Follow the manufacturer’srecommendations for proper maintenance of the battery backup unit.
333
86 NEVER BYPASS ANY PART OF THE SAFETY
SYSTEM (SENSORS, FLOW SWITCHES, ETC.)

7. Troubleshooting

7.1. Fault Codes
The table shown below is a list of fault codes that you will see during operation of the AquaDrop slide. The following sections will describe each of the fault codes and the steps required to resolve them.

UE
CODE

DESCRIPTION
00 Ready
07 Water low
11 System water needs cycle
22 Trapdoor sensor fault
23 V_DROP1 valve fault or pressure switch fault
32 V_DROP2 valve fault
33 System initialization
53 E-stop is pressed
88 Slide occupied
334
87 7.2. Common Problems
The following list describes typical problems that may arise during operation of the slide and a list of potential solutions to each.

Problem Solution
Entry door won’t open • If you have a Multi-Launch console, check that override switch is turned
OFF.
• Check proximity sensors on rotary
actuator, drop cylinder, and roller bar.

These should all be lit when the door is
closed. If they’re not lit, then they may
need to be adjusted or replaced.
• Check that “JBDOOR” switch is in the
ON position.
• Check that the release pin is
connected to the linear actuator and
linkage assembly
No Sound • Check that the voice output element
is properly connected to the voice
output connection element.
• The voice output element may need to
be replaced.

Trapdoor does not drop for heavy riders • Check the rollers for corrosion. • Check the unit air pressure.
• Check flow control valve setting.
• Ensure there isn’t water in the air lines.

Trapdoor does not latch in place after
launching a rider
• Check unit air pressure.
• Ensure trapdoor clamps are engaged.
• Ensure there isn’t water in the air lines.
• Confirm solenoid valve for rotary
actuator is functional.

Cannot launch rider when door is closed and
slide is clear
• Check that the light on the safety
switch is green when the door is
closed. If not, adjust the position of
the switch and actuator until the light
turns from red to green.
• Switch or actuator may need to
be replaced.
• Faulty electrical connection.

Flow switches won’t go low after water is
shut off
• Check flow switches for debris.
• Check electrical connections for
moisture and debris.
• Flow switches may need to be replaced.
335
88 7.3. Fault Code “UE 00”
Fault code “UE 00” indicates that the system is ready for operation.

When the PLC displays “UE 00” and the entry door is closed, both “LAUNCH” pushbuttons should be lit green and it is safe to launch a rider.

If the PLC displays “UE 00” but the two “LAUNCH” pushbuttons are not lit green then the system thinks that the entry door is open and won’t permit a launch.

Solutions:
• If the entry door is not closed, then close it using the “DOOR CLOSE” pushbutton. • If the entry door is already closed, there may be a problem with the door sensor or one of the electrical connections.
o Check the alignment of the sensor and ensure that the light on the sensor is green when the door is closed. If the light is red instead of green then it may be too far from the safety switch actuator and the position may need to be adjusted. o The problem may also be due to a faulty sensor or connection between the sensor and the distribution box or other electrical connection.

7.4. Fault Code “UE 07”
Fault code “UE 07” indicates there is insufficient water flow at one or more of the flow switches. The safety system continuously monitors each flow switch to ensure sufficient water flow.

If the system detects insufficient water flow, a fault will be triggered and “UE 07” will be displayed on the PLC.

The slide cannot operate until the problem has been
resolved. Solutions:
• Check that all pumps are turned on.
• Confirm that the basket strainer is clean.
• Identify which flow switch is causing the problem.
o AquaDrop has two paddle style flow switches.
o Use I/O table and look at PLC to see which one is off. o Flow switch may have debris in it or may need to be replaced.

7.5. Fault Code “UE 11”
Fault code “UE 11” indicates that the system water needs to be cycled.

The safety system checks each flow switch every 24 hours to confirm that it has 336
89 changed state from ON to OFF. This check confirms that each flow switch is functioning properly. Without this check, if a flow
337
90 switch failed in the ON position then the system would think the water is ON even when the water is OFF. This is not safe!
Normal daily operations where water is turned on in the morning and turned off in the evening is sufficient to satisfy this requirement.

If the system detects that one or more flow switches have not changed state, then “UE 11” will be displayed on the PLC.

The slide cannot operate until the problem has been
resolved. Solutions:
• With all pumps ON, confirm that all flow switch inputs on the PLC are ON. Refer to the I/O table. • If any flow switches are not ON then they may need to be cleaned or replaced. • With all pumps OFF, confirm that all flow switch inputs on the PLC are OFF. Refer to I/O table. • If any flow switches are not OFF then they may need to be cleaned or replaced.

7.6. Fault Code “UE 22”
Fault code “UE 22” indicates a trapdoor sensor fault, or anytime the system detects an incomplete launch sequence.

The safety system monitors each of the three trapdoor sensors to ensure they change state during each launch cycle. Similar to the flow switch check, this check confirms that each sensor is functioning properly.

The slide cannot operate until the problem has been
resolved. Causes:
• Faulty sensor
• Faulty solenoid valve
• Loose or faulty electrical connection
Solutions:
• Ensure all electrical connections are clean, free of moisture (dielectric grease is fine), and snug. • All three sensor inputs on PLC should be ON when the trapdoor is up and locked. There are also lights on each sensor. If not, the sensor may be misaligned or may need to be replaced. Refer to I/O table.
• Prepare the trapdoor for maintenance. Manually push the roller bar back to retract the drop cylinder; both the roller barsensor and the drop cylinder sensor inputs should be OFF. The rotary actuator sensor input should also be OFF. If any are ON, then the sensor may be misaligned or may need to be replaced. Refer to I/O table.
• If you replace a sensor and find that the problem is still not fixed, it could be a problem with the multi-port distribution box that connects the sensor back the “RCC1” panel. 338
91 1
2 3
o Example: If the sensor input on the PLC in ON when the sensor is unplugged from the distribution box, then there is likely a short circuit in the distribution box or cable. • If all three sensors are functioning correctly but you are still getting “UE 22” then it may be a faulty solenoid valve. Observe the lights on each solenoid to confirm that they are turning ON during a launch sequence. If not, there may be a faulty electrical connection or the valve may need to be replaced.

7.7. Fault Code “UE 23”
Fault code “UE 23” indicates a V_DROP1 solenoid valve fault, or a pressure sensor fault.

Two solenoid valves in series are used to actuate the drop cylinder; V_DROP1 (1) and V_DROP2 (2).

As part of the safety system, a pressure sensor (3) is located between the two valves to detect a valve failure.

V_DROP1 is energized first and then V_DROP2 is energized a 300ms later If the pressure sensor detects pressure at any time other than during the launch sequence, “UE 23” fault will be triggered because either V_DROP1 valve has failed in the OPEN position, or the pressure sensor has failed in the ON position.

Solutions:
• With the air supply OFF, if the pressure sensor input on the PLC is lit then the pressure sensor has failed. Refer to I/O table.
• If the pressure sensor input is not lit on the PLC when the air supply is OFF, but is lit when the air supply is ON, then the valve has failed in the OPEN position and will need to be replaced. Refer to I/O table.

7.8. Fault Code “UE 32”
Fault code “UE 32” indicates a V_DROP2 solenoid valve fault.

Two solenoid valves in series are used to actuate the drop cylinder; V_DROP1 (1) and V_DROP2 339
92 (2).
340
93 1
2 3
As part of the safety system, a pressure sensor (3) is located between the two valves to detect a valve failure.

V_DROP1 is energized first and then V_DROP2 is energized a 300ms later If the system detects movement of the trapdoor prior to V_DROP2 being energized, then V_DROP2 has failed OPEN and “UE 32” fault will be triggered.

Solutions:
• Replace V_DROP2 valve

7.9. Fault Code “UE 33”
Fault code “UE 33” indicates that the slide needs to be “cleared” before the system can operate.

The safety system requires manual checks and acknowledgment that the slide is clear of riders or other hazards before allowing operation. Refer to the Operations Manual for instructions on how to “Clear” the slide.

If after following the slide clearing sequence the slide will not operate, there is likely a problem with one of electrical devices.

Solutions:
• Referring to the I/O table, confirm that the inputs for the “CLEAR” button at the “RCC1” panel change state when pressed.
• Referring to the I/O table, confirm that the inputs for the “CLEAR” button at the end ofslide panel change state when pressed.
• If any of those devices don’t change state as they should, then there may be an electrical issue such as a loose wire, damaged cable, or water ingress. Contact electrician to resolve. 341
94 7.10.Fault Code “UE 53”
Fault code “UE 53” indicates that one of the “ESTOP” buttons is pressed.

The “ESTOP” buttons are Emergency Stop buttons that prevent the slide from operating in the event of an emergency.

Solutions:
• Release affected “ESTOP” button(s) and perform slide clearing procedure. • There may be an electrical issue with one of the devices; such as a loose wire, damaged cable, or water ingress. Contact electrician to resolve.

7.11.Fault Code “UE 88”
Fault code “UE 88” indicates that a rider is currently within the slide.

The safety system will not allow another rider to be launched until the slide is clear.

If after following the slide clearing sequence the slide will not operate, there is likely a problem with one of electrical devices.

Solutions:
• Check electrical devices/connection for loose wires, damaged cables, or water ingress. Contact electrician to resolve.
342
95 8. Technical Support
If after following all of the troubleshooting steps you still cannot resolve the issue, you may contact our technical support team. WhiteWater has a qualified team of specialists available to help resolve your issue.
343
96 9. Spare Parts
Always remember to replenish your spares following any maintenance activities. You can contact WhiteWater’s After Sales department or visit our After Sales & Service E-store to order parts.
http://aftersales.whitewaterwest.com
344
97 10. Appendix

10.1.AquaDrop Flow Chart
345
98 10.2.I/O Table
346
ADDENDUM: SHUTDOWN LANE FLOW TRANSITION DATA RECORDING SHEET,

AQUADROP, SLIDE AE
April 7, 2016 Page 29 Project # 31548 – Emerald Glen Aquatic Center 347

FLOW RATE

DIMENSION-A
(SPECIFY UNITS)

DIMENSION-B
(SPECIFY UNITS)

DIMENSION-C
(SPECIFY UNITS)

FINAL MEASUREMENTS
245 25 GPM

6.5 IN
87 FT.
2 IN

DIMENSION B

CAUTION - HYDRAULIC LOCATION IS FOR
REPRESENTATION PURPOSES ONLY. FINAL

HYDRAULIC LOCATION TO BE DETERMINED
DURING COMMISSIONING.

G

OPERATING WATER DEPTH MEASUREMENT LOCATIONS

DIMENSION C IS THE MINIMUM DISTANCE

FROM THE HYDRAULIC TRANSITION WHERE AN
ACCURATE READING CAN BE TAKEN.

DETAIL G

MEASURE
1'-0"
300

AWAY FROM JOINT

DETAIL H
NOTE:-

METRICMM
IMPERIAL [IN]

METRIC DIMENSIONS

PROJECT NAME EMERALD GLEN AQUATIC CENTER

WHITEWATER
WhiteWater West Industries Ltd
6700 McMillan Way, Richmond, B.C. Canada V6W 1J7

PROJECT NUMBER

SLIDE NUMBER

CERTIFIER
31548
AE
ANDY

MULLIGA
N
ALL RIGHTS RESERVED. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF WHITEWATER AND SHALL NOT BE REPRODUCED OR USED ON ANY OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH WHITEWATER

DIMENSION A
(WATER DEPTH)

DIMENSION C
(WATER DEPTH)
H
A UPDATED WITH FINAL MEASUREMENTS MAR 20 2018 RS
0 RELEASED JUN 06 2017 CB

REV REVISION DESCRIPTION/ISSUE RECORD DATE PE

DESIGNED BY
CB
DATE
JUN 05 2017
PROJ. ENG. CHECK
CB
DATE
JUN 06 2017

DRAWN BY
SJ
DATE
JUN 06 2017

DRAFTING CHECK
CB
DATE
JUN 06 2017
SCALE
1:60

ARCHIVE
FILE No.
348
Tel (604) 273
-1068 Fax (604) 273-4518
CERTIFIER DATE 12
-MAR-2018
PROJECT No.
31548
DRAWING No.
31548-AE-S1270

REVISION
A

SHUTDOWN LANE FLOW TRANSITION

DATA RECORDING SHEET

EMERALD GLEN AQUATIC CENTER
FILE : C:\Slides1\Projects\31548 Emerald Glen Aquatic Center\Documents\Shutdown Lane Drawings\31548-AE-S1270-SHUTDOWN-LANE-FLOW-TRANSITIONLAST SAVED BY : rick.sebulsky , ON Tuesday, March 20, 2018 2:13:16 PM 349
ADDENDUM: PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF

WATERSLIDE
April 7, 2016 Page 30 Project # 31548 – Emerald Glen Aquatic Center 350

PROCEDURE
PROJECT NO.
-
DOCUMENT NO.
428676

REVISION
X3

CREATED BY
R.S.

DATE
2017-07-06

APPROVED BY
C.B.

DATE
2018-03-05
TITLE

PROCEDURE FOR ANNUAL OPERATIONAL TESTING OF WATERSLIDE

OBJECTIVE
The objective of this procedure is to outline the procedure for the Owner/Operator to perform annual operational testing on their slide to ensure that it’s operating within its prescribed operational limits.

SCOPE
The scope of this document is limited to high speed body slides with shutdown lanes.

PROCEDURE FOR OPERATIONAL TESTING
This section will outline the procedure for the Owner/Operator to perform annual operational testing on their slide to ensure that it’s operating within its prescribed operational limits set during commissioning.

1. Inspect the slide surface and joints for defects such as chips and cracks. Perform remedial work as necessary.

2. To ensure optimal slide performance, the slide surface must be clean and free of scale and residue.

Clean and wax the slide surface, per the O&M, if the slide surface is compromised.

3. Turn on the slide pumps. Ensure valve lockout tags installed during commissioning are still in place and haven’t been tampered with. Verify that all flow meters are functional and reading within the prescribed range documented within the completed “shutdown lane flow transition data recording sheet” for the given slide.

4. Inspect the shutdown lane settings. Ensure that the flow transition is approximately centered within the flow transition markers, and that the water depth at the end of the shutdown lane is at the height of the depth marker set during commissioning. Refer to the completed “shutdown lane flow transition data recording sheet” for commissioning settings.

5. Document all slide settings; including slide surface quality, flow rate, location of flow transition, weir height, and depth of water in the shutdown lane.

REFERENCE
Refer to the “shutdown lane flow transition data recording sheet” completed for the given slide during commissioning. This sheet provides the final, commissioned flow, depth and transition location measurements.

WHITEWATER WEST INDUSTRIES LTD.

Richmond, BC Canada
6700 McMillan Way
V6W 1J7
Ph.

Fax.

Web.
(604) 273-1068
(604) 273-4518
www.whitewaterwest.com

Page 1 of 1 ends
← All documents from this meeting