EXISTING "HOV LANE ENTRANCE" SIGN (G92-1 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING LEFT ARROW SIGN (M6-1) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING DOUBLE ARROW SIGN (M6-4) PER CALTRANS STANDARD RS2 TO REMAIN. 35 13
36373839
14 2728
4041
15 30
44454647
PAINT TYPE I (10') ARROW PER CALTRANS STANDARD PLAN RSP A24A.PAINT TYPE II (B) ARROW PER CALTRANS STANDARD PLAN RSP A24B.PAINT TYPE VII (R) ARROW PER CALTRANS STANDARD PLAN RSP A24A.PAINT "BIKE" PAVEMENT WORD MARKING PER CALTRANS STANDARD PLAN RSP A24D.
PAINT "LANE" PAVEMENT WORD MARKING PER CALTRANS
STANDARD PLAN RSP A24D.
PAINT BIKE LANE ARROW MARKING PER CALTRANS
STANDARD PLAN RSP A24A.
PAINT WHITE LANE LINE MARKING PER CALTRANS STANDARDDETAIL 9 ON PLAN SHEET A20A.PAINT WHITE CHANNELIZING LINE MARKING PER CALTRANSDETAIL 38A ON PLAN SHEET A20D.PAINT WHITE BIKE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 39 ON PLAN SHEET A20D.
PAINT WHITE INTERSECTION LINE BIKE LANE MARKING PER
CALTRANS STANDARD DETAIL 39A ON PLAN SHEET A20D.
PAINT YELLOW MEDIAN ISLAND MARKING PER CALTRANS
STANDARD DETAIL 29 ON PLAN SHEET RSP A20B.
PAINT WHITE CONTINENTAL CROSS WALK MARKINGS PER
CALTRANS STANDARD PLAN RSP A24F.
INSTALL INTERSECTION LANE CONTROL SIGN (R61-33) PER CALTRANS STANDARD PLAN RS2.INSTALL BIKE LANE SIGN (R81 (CA)) PER CALTRANS STANDARD PLAN RS2. PANELS SHALL BE BLACK AND WHITE.INSTALL UP ARROW SIGN (M6-3) PER CALTRANS STANDARD PLAN RS2. PANELS SHALL BE BLACK AND WHITE.INSTALL ROUTE 8 SHIELD WITH "WEST" UP ARROW AND "EAST" RIGHT ARROW INTERCHANGE GUIDE SIGN (G77) PER CALTRANS STANDARD PLAN RS2.
INSTALL NO U-TURN NO LEFT TURN (SYMBOL) SIGN (R3-18) PER CALTRANS STANDARD PLAN RS2.INSTALL INTERSECTION LANE CONTROL SIGN (R61-32) PER CALTRANS STANDARD PLAN RS2.
NEW SIGNAGE AND STRIPING KEYNOTES
1 2
3 4
5 6
7 89
10 11
12 13
14 15161718
O
CALTRANS STA 98+65
1 1
3 3 3
4 6
9 9
9 12
12 14 14
14 16
22 16
12 16
16 23
23 24
1 2
2 STARTSTA 104+03
4 END
STA 103+42
4 STARTSTA 104+03
3 STARTSTA 104+03
6 6
6 6
END
STA 101+97
6 STARTSTA 101+88
5 END
STA 100+99
5 5
5 8' 12' 12' 16' 29' 12' 8' 12' 16 14 17 24 24 24 14 16 16 3
6 6
6 6
12 16
24 16
℄ ℄ ℄ ℄
STA 102+13 29
STA 102+13 34
STA 101+96 36
STA 101+24 35
38 39 41
STA 100+65 36 STA 100+37 35
STA 100+36 36
STA 100+73 30
STA 100+72 33
29 STA 100+72 36
29 30
34 STA 101+27 38
1 39 41 45
STA 100+65
STA 100+65
STA 100+65
STA 100+65
STA 100+65
9 9
9 9
9 STA 98+94 10
STA 98+94 10
STA 98+94 10
STA 98+94 10
15 END
STA 103+42
3 24
SOUTH IMPERIAL AVENUE
14 15
9 13
9 STA 101+16
STA 101+17
STA 101+15
EXISTING TYPE II (R) ARROW PER CALTRANS STANDARD PLAN RSP A24B TO BE REMOVED.EXISTING TYPE IV (R) ARROW PER CALTRANS STANDARD PLAN RSP A24A TO BE REMOVED.EXISTING WHITE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 9 ON PLAN SHEET A20A TO BE
REMOVED.EXISTING WHITE RIGHT EDGE LINE MARKING PER
CALTRANS STANDARD DETAIL 27B ON PLAN SHEET
A20B TO BE REMOVED.
EXISTING WHITE LANE LINE EXTENSIONS THROUGH
INTERSECTIONS MARKING PER CALTRANS STANDARD
DETAIL 40 ON PLAN SHEET A20D TO BE REMOVED.EXISTING YELLOW LEFT EDGE LINE MARKING PER CALTRANS STANDARD DETAIL 25A ON PLAN SHEET
A20B TO BE REMOVED.
EXISTING NO PEDESTRIANS, BICYCLES, MOTOR-DRIVEN CYCLES SIGN (R5-10a) TO BE REMOVED.EXISTING NO PEDESTRIAN CROSSING (SYMBOL) SIGN (R9-3) TO BE REMOVED.EXISTING "ROAD CLOSED" SIGN (R11-2) TO BE REMOVED.EXISTING OBJECT MARKER SIGN (N-2 (CA)) TO BE REMOVED.EXISTING WHITE BASIC CROSS WALK MARKING PER CALTRANS STANDARD PLAN A20F TO BE REMOVED.
EXISTING INTERSECTION LANE CONTROL SIGN (R61-2) TO BE REMOVED.EXISTING DOUBLE LEFT TURN NO U-TURN SIGN (R73-8) TO BE REMOVED.
DEMO SIGNAGE AND STRIPING
KEYNOTES
123456789
10111213
0' 30' 60' 90'
SCALE: 1"=30'
30'
DATE
DIST COUNTY ROUTE MILE POST SHEET TOTAL TOTAL PROJECT NO. SHEETS IMPERIAL I8
PERMIT NUMBER 11- 19-NUR-0675
CO IMP RTE I8 PM
STATE REPRESENTATIVE DATE
R36.50-R37.50
11 06/09/2022
AS-BUILT PLANS FOR ROADWAY GEOMETRICAND ABOVE GROUND FEATURES
END OF STRIPING AND SIGNAGE PLAN AT CALTRANS
STA 98+65
EXISTING/DEMO/NEW SIGNAGE AND STRIPING PLAN CALTRANS STA 104+85 TO 98+65
NEW STRIPING AND SIGNAGE CONDITION
MATCH LINE WITH TOP LEFT ON SHEET 34 AT CALTRANS
STA 104+85
END OF STRIPING AND SIGNAGE PLAN AT CALTRANS
STA 98+65
EXISTING/DEMOLITION STRIPING AND SIGNAGE CONDITION
REFER TO DEMO/NEW STRIPING AND
SIGNAGE QUANTITY CHARTS ON SHEET 33.
MATCH LINE WITH TOP LEFT ON SHEET 34 AT CALTRANS
STA 104+85
MATCH LINE WITH TOP RIGHT ON SHEET 36 AT
CALTRANS STA 702+60E
MATCH LINE WITH BOTTOM RIGHT ON SHEET 36 AT
CALTRANS STA 702+60E
17.a
Packet Pg. 283
Attachment: 11X17 Phase I Bid Set Plans (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) EXISTING TYPE I (24') ARROW PER CALTRANS STANDARD PLAN RSP A24A TO REMAIN.
EXISTING TYPE I (10') ARROW PER CALTRANS STANDARD PLAN RSP A24A TO REMAIN.EXISTING TYPE IV (R) ARROW PER CALTRANS STANDARD PLAN RSP A24A TO REMAIN.EXISTING TYPE IV (L) ARROW PER CALTRANS STANDARD PLAN RSP A24A TO REMAIN.EXISTING TYPE III (R) ARROW PER CALTRANS STANDARD PLAN RSP A24B TO REMAIN.EXISTING TYPE III (L) ARROW PER CALTRANS STANDARD PLAN RSP A24B TO REMAIN.EXISTING TYPE II (R) ARROW PER CALTRANS STANDARD PLAN RSP A24B TO REMAIN.EXISTING WHITE BASIC CROSSWALK MARKING PER CALTRANS STANDARD PLAN RSP A24F TO REMAIN.
EXISTING WHITE CONTINENTAL CROSSWALK MARKING PER CALTRANS STANDARDPLAN RSP A24F TO REMAIN.EXISTING YELLOW CONTINENTAL CROSSWALK MARKING PER CALTRANS STANDARDPLAN RSP A24F TO REMAIN.EXISTING WHITE STOP LEGEND MARKING PER CALTRANS STANDARD PLAN RSP A24D TO REMAIN.
EXISTING WHITE LIMIT LINE MARKING PER CALTRANS STANDARD PLAN RSP A24E TOREMAIN.EXISTING WHITE YIELD LINE MARKING PER CALTRANS STANDARD PLAN RSP A24E TOREMAIN.EXISTING WHITE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 9 ON PLAN SHEET A20A TO REMAIN.
EXISTING WHITE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 9A ON PLAN SHEET A20A TO REMAIN.
EXISTING SIGNAGE AND STRIPING KEYNOTES
123456789
101112
291718192021221623
242526
424331323334
EXISTING WHITE RIGHT EDGE LINE MARKING PER CALTRANS STANDARD DETAIL 27B ON PLAN SHEET A20B TO REMAIN.EXISTING WHITE CHANNELIZING LINE MARKING PER CALTRANS STANDARD DETAIL 38 ON PLAN SHEET A20D TOREMAIN.EXISTING WHITE CHANNELIZING LINE MARKING PER CALTRANS STANDARD DETAIL 38A ON PLAN SHEET A20D TOREMAIN.EXISTING WHITE CHANNELIZING LINE MARKING PER CALTRANS STANDARD DETAIL 38B ON PLAN SHEET A20D TOREMAIN.EXISTING WHITE BIKE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 39 ON PLAN SHEET A20D TO REMAIN.EXISTING WHITE INTERSECTION LINE BIKE LANE MARKING PER CALTRANS STANDARD DETAIL 39A ON PLAN SHEET A20D TO REMAIN.
EXISTING WHITE LANE LINE EXTENSIONS THROUGH INTERSECTIONS MARKING PER CALTRANS STANDARD DETAIL 40 ON PLAN SHEET A20D TO REMAIN.
EXISTING YELLOW LEFT EDGE LINE MARKING PER CALTRANS STANDARD DETAIL 25A ON PLAN SHEET A20B TOREMAIN.EXISTING YELLOW MEDIAN ISLANDS MARKING PER CALTRANS STANDARD DETAIL 29 ON PLAN SHEET A20B TO REMAIN.EXISTING TRAFFIC LIGHT AHEAD (SYMBOL) ADVANCED TRAFFIC CONTROL SIGN (W3-3)D PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "STOP" SIGN (R1-1) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING NO RIGHT TURN (SYMBOL) MOVEMENT PROHIBITION SIGN (R3-1) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING NO LEFT TURN (SYMBOL) MOVEMENT PROHIBITION SIGN (R3-2) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "DO NOT ENTER" SIGN (R5-1) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "WRONG WAY" SIGN (R5-1a) PER CALTRANS STANDARD RS2 TO REMAIN.
EXISTING "NO PEDESTRIAN" SIGN (R5-10c) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "ONE WAY" SIGN (R6-1R) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "ONE WAY" SIGN (R6-1L) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING NO PEDESTRIAN CROSSING (SYMBOL) SIGN (R9-3) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING PEDESTRIAN SIGN (R10-3eR) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING PEDESTRIAN SIGN (R10-3eL) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING BIKE LANE SIGN (R81 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING INTERSTATE ROUTE MARKER SIGN (G27-2 (8) (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING DIRECTIONAL ARROW AUXILIARY SIGN (G43 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING DIRECTIONAL ARROW AUXILIARY SIGN (G44 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "EAST" SIGN (G49 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "WEST" SIGN (G50 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING "DOWNTOWN EL CENTRO" SIGN (G85-1 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING ROUTE 8 SHIELD WITH "WEST" UP ARROW AND "EAST" RIGHT ARROW INTERCHANGE GUIDE SIGN (G75) PER CALTRANS STANADARD RS2 TO REMAIN.
EXISTING "HOV LANE ENTRANCE" SIGN (G92-1 (CA)) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING LEFT ARROW SIGN (M6-1) PER CALTRANS STANDARD RS2 TO REMAIN.EXISTING DOUBLE ARROW SIGN (M6-4) PER CALTRANS STANDARD RS2 TO REMAIN. 35 13
36373839
14 2728
4041
15 30
44454647
15 2
STA 700+52
STA 100+65
6 6
15 15
15 16 16
16 16
23 23
23 23
STA 700+46
STA 696+32
2 15
16 23
43 31
13 13
PAINT TYPE I (10') ARROW PER CALTRANS STANDARD PLAN RSP A24A.PAINT TYPE II (B) ARROW PER CALTRANS STANDARD PLAN RSP A24B.PAINT TYPE VII (R) ARROW PER CALTRANS STANDARD PLAN RSP A24A.PAINT "BIKE" PAVEMENT WORD MARKING PER CALTRANS STANDARD PLAN RSP A24D.
PAINT "LANE" PAVEMENT WORD MARKING PER CALTRANS
STANDARD PLAN RSP A24D.
PAINT BIKE LANE ARROW MARKING PER CALTRANS
STANDARD PLAN RSP A24A.
PAINT WHITE LANE LINE MARKING PER CALTRANS STANDARDDETAIL 9 ON PLAN SHEET A20A.PAINT WHITE CHANNELIZING LINE MARKING PER CALTRANSDETAIL 38A ON PLAN SHEET A20D.PAINT WHITE BIKE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 39 ON PLAN SHEET A20D.
PAINT WHITE INTERSECTION LINE BIKE LANE MARKING PER
CALTRANS STANDARD DETAIL 39A ON PLAN SHEET A20D.
PAINT YELLOW MEDIAN ISLAND MARKING PER CALTRANS
STANDARD DETAIL 29 ON PLAN SHEET RSP A20B.
PAINT WHITE CONTINENTAL CROSS WALK MARKINGS PER
CALTRANS STANDARD PLAN RSP A24F.
INSTALL INTERSECTION LANE CONTROL SIGN (R61-33) PER CALTRANS STANDARD PLAN RS2.INSTALL BIKE LANE SIGN (R81 (CA)) PER CALTRANS STANDARD PLAN RS2. PANELS SHALL BE BLACK AND WHITE.INSTALL UP ARROW SIGN (M6-3) PER CALTRANS STANDARD PLAN RS2. PANELS SHALL BE BLACK AND WHITE.INSTALL ROUTE 8 SHIELD WITH "WEST" UP ARROW AND "EAST" RIGHT ARROW INTERCHANGE GUIDE SIGN (G77) PER CALTRANS STANDARD PLAN RS2.
INSTALL NO U-TURN NO LEFT TURN (SYMBOL) SIGN (R3-18) PER CALTRANS STANDARD PLAN RS2.INSTALL INTERSECTION LANE CONTROL SIGN (R61-32) PER CALTRANS STANDARD PLAN RS2.
NEW SIGNAGE AND STRIPING KEYNOTES
1 2
3 4
56789
10 11
12131415161718
15 1
STA 696+33
STA 700+52
6 1
6 15
15 15
16 16
16 16
23 23
23 23
STA 700+46
STA 696+32
15 16
23 12
12 43
31 EXISTING TYPE II (R) ARROW PER CALTRANS STANDARD PLAN RSP A24B TO BE REMOVED.EXISTING TYPE IV (R) ARROW PER CALTRANS STANDARD PLAN RSP A24A TO BE REMOVED.EXISTING WHITE LANE LINE MARKING PER CALTRANS STANDARD DETAIL 9 ON PLAN SHEET A20A TO BE
REMOVED.EXISTING WHITE RIGHT EDGE LINE MARKING PER
CALTRANS STANDARD DETAIL 27B ON PLAN SHEET
A20B TO BE REMOVED.
EXISTING WHITE LANE LINE EXTENSIONS THROUGH
INTERSECTIONS MARKING PER CALTRANS STANDARD
DETAIL 40 ON PLAN SHEET A20D TO BE REMOVED.EXISTING YELLOW LEFT EDGE LINE MARKING PER CALTRANS STANDARD DETAIL 25A ON PLAN SHEET
A20B TO BE REMOVED.
EXISTING NO PEDESTRIANS, BICYCLES, MOTOR-DRIVEN CYCLES SIGN (R5-10a) TO BE REMOVED.EXISTING NO PEDESTRIAN CROSSING (SYMBOL) SIGN (R9-3) TO BE REMOVED.EXISTING "ROAD CLOSED" SIGN (R11-2) TO BE REMOVED.EXISTING OBJECT MARKER SIGN (N-2 (CA)) TO BE REMOVED.EXISTING WHITE BASIC CROSS WALK MARKING PER CALTRANS STANDARD PLAN A20F TO BE REMOVED.
EXISTING INTERSECTION LANE CONTROL SIGN (R61-2) TO BE REMOVED.EXISTING DOUBLE LEFT TURN NO U-TURN SIGN (R73-8) TO BE REMOVED.
DEMO SIGNAGE AND STRIPING
KEYNOTES
123456789
10111213
0' 30' 60' 90'
SCALE: 1"=30'
30'
DATE
DIST COUNTY ROUTE MILE POST SHEET TOTAL TOTAL PROJECT NO. SHEETS IMPERIAL I8
PERMIT NUMBER 11- 19-NUR-0675
CO IMP RTE I8 PM
STATE REPRESENTATIVE DATE
R36.50-R37.50
11 06/09/2022
AS-BUILT PLANS FOR ROADWAY GEOMETRICAND ABOVE GROUND FEATURES MATCHLINE WITH BOTTOM ON SHEET 35
AT CALTRANS STA 702+60E
EXISTING/DEMO/NEW SIGNAGE AND STRIPING PLAN CALTRANS STA 702+60E TO 696+00E
NEW STRIPING AND SIGNAGE CONDITION
END OF STRIPING AND SIGNAGE PLAN AT
CALTRANS STA 696+00E
MATCHLINE WITH BOTTOM ON SHEET 35 AT
CALTRANS STA 702+60E
EXISTING/DEMO STRIPING AND SIGNAGE CONDITION
END OF STRIPING AND SIGNAGE PLAN AT
CALTRANS STA 696+00E
REFER TO DEMO/NEW STRIPING AND
SIGNAGE QUANTITY CHARTS ON SHEET 33.
17.a
Packet Pg. 284
Attachment: 11X17 Phase I Bid Set Plans (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
17.b
Packet Pg. 285 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
1 CITY OF EL CENTRO
STATE OF CALIFORNIA
TABLE OF CONTENTS
VOLUME I OF II
Title Section Page Number
Invitation for Bids (Notice to Contractors) 2
Bid Requirements 6
Minimum Wages 8
General Conditions 11
Specifications 31
Special Provisions 32
Special Conditions 40
Technical Specifications 82
Bid Form 100
Bidder’s List of Subcontractors 109
Equal Employment opportunity certification 112
Public Contract Code (Statement, Questionnaire, and Noncollusion Declaration)
113-115
Noncollusion Affidavit 116
Noncollusion Declaration 117
Debarment and suspension certification 118
Nonlobbying certification 119
Disclosure of lobbying activities 120
Bid Agreement 122
Bidder’s Bond 123
Local agency bidder DBE commitment (Exhibit 15-G) 124
DBE information – Good Faith Efforts (Exhibit 15-H) 125 Disadvantaged Business Enterprises (DBE) Certification Status Change 129 Final Report Utilization of DBE 130
Agreement 132
FHWA Certification 145
Faithful performance bond 155
Labor and material bond 156
Workers’ compensation insurance certificate 157
Drug/alcohol testing requirements 158
Corporate/partnership certification information 159
Contractor certification of qualification for license classification 160 Prevailing Wage Rates 161
17.b
Packet Pg. 286 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) 2 CITY OF EL CENTRO
INVITATION FOR BIDS
EXTENSION OF IMPERIAL AVENUE FROM INTERSTATE 8 TO WAKE AVENUE AND WAKE
AVENUE EAST OF IMPERIAL AVENUE
1. GENERAL INFORMATION
The City of El Centro is inviting bids for the EXTENSION OF IMPERIAL AVENUE FROM INTERSTATE 8
TO WAKE AVENUE AND WAKE AVENUE EAST OF IMPERIAL AVENUE
2. SCOPE OF WORK
This project involves construction of a new roadway from the I-8 interchange to Wake Avenue and the westerly extension of Wake Avenue. Project will include grading of native soil, subgrade preparation, installation of Class II Base, installation of A.C. Pavement, Crack Sealing activities, Type II Slurry installation, installation of a storm drain swale and pipe, installation of PCC sidewalk and curb ramps, adjustment of utility covers and traffic striping.
3. PROJECT SCHEDULE
To be completed within two hundred (200) working days after approval of contract.
4. PROPOSAL REQUIREMENTS
SEALED PROPOSALS will be accepted at the Office of the City Clerk, City Hall, 1275 Main Street, El Centro, California until 2:00 p.m. on August 4, 2022 at which time all proposals will be publicly opened and read aloud.
A summary of the bids will be presented to the City Council at their meeting of Tuesday, September 6, 2022 at 6:00 p.m. in the City Council Chambers, 1275 Main Street, El Centro, California Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form.
Copies of plans and specifications may be obtained through Planetbids by visiting www.cityofelcentro.org and selecting Bids&Proposals > Public Works (Planet Bids) from the “DOING BUSINESS” drop down menu or by visiting https://pbsystem.planetbids.com/portal/41180/portal-home No bid will be received unless it is made on the prescribed bid form furnished by the Director of Public Works. Each bid must be accompanied by a guaranty of cash, certified check, and cashier check or bidders’ bond made payable to the City of El Centro for an amount equal to at least ten percent (10%) of the bid. Such guaranty to be forfeited should the bidder to whom the contract is awarded fails to enter the contract.
All guaranties are to be returned after the contract is awarded.
The bid may be considered incomplete and be disqualified if any of the following information is not provided.
DOCUMENT Pg. DOCUMENT Pg.
Bid Form 100 Bid Agreement 122
Bidder’s List of Subcontractors 109 Bidder’s Bond 123
Equal Employment Opportunity
Certification
112 Local Agency bidder DBE Commitment (15-G) 124
Public Contract Code Section 10285.1
Statement
113 DBE Information – Good Faith Efforts (15-H)
(Whether DBE Goal met or not)
125
17.b
Packet Pg. 287 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) 3 Public Contract Code Section 10162
Questionnaire
114
Public Contract Code Section 10232
Statement
115 Workers’ Compensation Certificate 157
Noncollusion Affidavit 116 Drug/Alcohol Testing Requirements 158 Debarment and Suspension 118 Corporate Certification Partnering Information 159 Nonlobbying Certification 119 Contractor Certification for license classification 160 Disclosure of Lobbying Activities 120
1. On the bid form(s), the unit price items and total contract price must be written in words and figures. The words and figures shall appear on the blank spaces provided.
2. On page 109, Subcontractor’s Listing shall be completed. If no subcontractor will be used, indicate with an “X” mark on the space provided for “No” subcontractor.
MANDATORY PRE-BID MEETING: Bidders are required to attend a pre-bid meeting which will be conducted by the City of El Centro Project Engineer at 10:00.a.m. on July 12, 2022. The meeting will be held at the City of El Centro, City Hall RDA Conference Room A located at 1249 W. Main Street in El Centro. The object of the meeting is to acquaint bidders with the site conditions and mandatory bidding requirements and subcontractors of subcontracting and material supply opportunities. At that meeting the City of El Centro’s Equal Opportunity Program goals and reporting procedures will be discussed.
QUESTIONS: Technical questions should be directed to: Andres Miramontez, PE, Senior Engineer. All questions must be submitted through planetbids. Any response will be in a written addendum. All questions must be submitted 14 calendar days before bid closing.
LICENSE REQUIREMENTS: The contractor shall possess a Class A license at the time this contract is awarded and be registered with the Department of Industrial Relations.
Bids are required for the entire work described herein.
The successful bidder shall furnish a payment bond and a performance bond.
THIS PROJECT IS SUBJECT TO THE “BUY AMERICA” PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991.
This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code §12990.
Inquiries or questions based on alleged ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest.
The City of El Centro affirms that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation.
Pursuant to Labor Code §1773, the general state prevailing wage rates in the city or county in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at City of El Centro address and available from the California Department of Industrial Relations’ Internet web site at http://www.dir.ca.gov/DLSR/PWD.
17.b
Packet Pg. 288 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
4 The applicable Federal minimum wage rates as predetermined by the United States Secretary of Labor are available in the City of El Centro’s website under the section dedicated to this project which is found at http://www.cityofelcentro.org/rfps.html In addition, a copy may be examined at the offices described above where project plans, special provisions, and bid forms may be seen. Revisions to the applicable Federal Wage Rates, up to ten (10) days before bid opening, will be identified by the issuance of an addendum with the corresponding Internet Website address of where the revisions can be found. The final contract documents signed by the local agency and the contractor, will physically include the Federal Wage Rates, or the Federal Wage Rates as revised by addendums, if any such addendums have been issued. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates
Attention is directed to the Federal minimum wage rate requirements in the Contract Documents. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes “helper” (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question.
The U.S. Department of Transportation (“DOT”) provides a toll-free hotline service to report bid rigging activities.
Bid rigging activities can be reported Monday through Friday, between 8:00 a.m. and 5:00 p.m., Eastern Standard Time at 800/424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the hotline to report these activities. The hotline is part of DOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.
All bids are to be compared on the basis of the Director of Public Works estimate of the quantities of work to be done. A bid will only be accepted from a Contractor who is licensed in accordance with the provisions of Business and Professions Code §§7000 et seq. as amended.
Contractor and Subcontractor Registration with State Department of Industrial Relations.
Labor Code section 1771.1 provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Public Contract Code section 4104, or engage in the performance of any contract for public work, as that term is defined in Chapter 1, Part 7, Division 2 of the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. Labor Code section 1771.1 also provides that it is not a violation of that section for an unregistered contractor to submit a bid that is authorized by Business and Professions Code section 7029.1 or by Public Contract Code section 10164, provided the contractor is registered to perform public work pursuant to Labor Code section 1725.5 at the time the contract is awarded.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
DISADVANTAGED BUSINESS ENTERPRISES (DBE)
Bidders are advised that, as required by federal law, the City of El Centro is implementing Disadvantaged Business Enterprise (“DBE”) requirements. Section 2, “Proposal Requirements and Conditions,” under subsection titled “Disadvantaged Business Enterprises (DBE)” and Section 5, “General,” under subsection titled “Performance of Subcontractors” of the Federal Aid Project Special Provisions cover the DBE requirements.
This project has a specific contract DBE Contract goal of 6.0%
17.b
Packet Pg. 289 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
5 CITY’S RIGHTS RESERVED: The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City.
DATE: _____________________ CITY OF EL CENTRO, CALIFORNIA _____________________________
Norma Wyles, City Clerk
END OF INVITATIONS FOR BIDS
17.b
Packet Pg. 290 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
6 BID REQUIREMENTS
1. Examination of Plans, Specifications, Special Provisions and Site of Work: The bidder is required to examine carefully the site of work contemplated and it will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and quantities of work to be performed and materials to be furnished and as to the requirements of the specifications, special provisions and the contract. It is mutually agreed that submission of a bid shall be considered prima facie evidence that the bidder has made such examination.
2. Bid Form: All bids must be made on the bid forms to be obtained from the Engineering Department at 1275 W. Main Street, El Centro, California. All bids must give the prices proposed both in writing and figures and must be signed by the bidder with bidders’ business address.
If the bid is made by an individual, the individual's name and post office address must be shown. If made by a firm or partnership, then the name and post office address of each member of the firm or partnership must be shown. If made by a corporation, then the bid must show the name of the State under the laws of which the corporation is chartered and the name, titles and business addresses of the President, Secretary and Treasurer. A certification by the legal representative of the firm must be included in the bid.
3. Rejection of Bid Containing Alterations, Erasures or Irregularities: Bids may be rejected if they show any alterations of form additions not called for, conditional or alternative bids, incomplete bids, erasures or irregularities of any kind.
4. The Bid may be withdrawn upon request by the bidder without prejudice prior to, but not after the time fixed for opening of bids provided that the request is in writing, has been executed by the bidder or the bidders duly authorized representative and is filed with the City Clerk.
4.1 Omissions and Discrepancies: If the bidder finds discrepancies in or omissions on the drawings, or other contract documents or if bidder is in doubt as to their meaning, the bidder should at once notify the Director of Public Works who may send a written instruction to all bidders.
4.2 Interpretations and Addenda: No oral interpretations shall be made to any bidder as to the meaning of any of the contract documents, or be effective to modify any of the provisions of the contract documents. Every request for an interpretation shall be made in writing and addressed and forwarded to the Director of Public Works.
4.3 The City of El Centro reserves the right to reject any or all bids.
5. Bidder’s Guaranty: All bids shall be presented under sealed cover and shall be accompanied by cash, cashier’s check, certified check, or bidder’s bond made payable to the City of El Centro for an amount equal to at least ten percent (10%) of the amount of said bid, and no bid shall be considered unless such cash, cashier’s check, certified check or bidder’s bond is enclosed therewith.
5.1 Return of Bid Guaranty: Within ten (10) days after the award of the contract, the City Council will return the bid guaranties accompanying the bids, which are not to be considered in making the award. All other bid guaranties will be held until the contract has been finally executed, after which they will be returned to the respective bidders whose bids they accompany.
5.2 Execution of Contract: The contract and contract documents shall be signed by the successful bidder and returned together with the contract bonds, within ten (10) days, not including Sundays, after the bidder has received notice the contract has been awarded. No bid shall be considered binding upon the City until the execution of the contract. Failure to execute the contract and file acceptable bonds as provided herein within ten (10) days, not including Sundays, after the bidder has received notice that the contract has been awarded, shall be just cause for the annulment of the award and the forfeiture of the bid guaranty.
17.b
Packet Pg. 291 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
7 5.3 Sureties: The successful bidder shall also promptly secure with a responsible corporate surety or corporate sureties satisfactory bonds conditioned upon faithful performance by the said bidder of all the requirements under the contract and upon the payment of claims of any material men and laborers thereunder.
6. Award of Contract: The award of the contract, if it is awarded, will be to the lowest responsive and responsible bidder whose bid complies with all the requirements prescribed. The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items that are specifically identified in the bid solicitation as being used for the purpose of determining the lowest bid price. The award, if made, will be made within sixty (60) calendar days after the opening of the bids. All bids will be compared on the basis of the Director of Public Works estimate of quantities of work to be done.
7. Projects financed in whole or in part with State or Federal funds shall be subject to inspection at all times by the Director of Public Works or his agents.
8. Removal of Defective and Unauthorized Work: All work which is defective in its construction or deficient in any of the requirements of these specifications, special provisions or plans shall be remedied or removed and replaced by the contractor in an acceptable manner and no compensation will be allowed for such correction. Any work done beyond the lines and grades shown on the plans or established by the Director of Public Works, or any extra work done without written authority will be considered as unauthorized and will not be paid for.
9. Upon failure on the part of the contractor to comply with any order of the Director of Public Works made under these provisions, the Director of Public Works shall be the authority to cause defective work to be removed and to deduct the costs thereof from any monies due or to become due to the contractor.
10. Final Inspection: Whenever the work provided and contemplated by the contract shall have been satisfactorily completed and the final clean up performed, the Director of Public Works will make the final inspection at the site.
11. Amount of Bonds: The faithful performance bond shall be in the sum of not less than one hundred percent (100%) of the contract price.
The bond for material men and laborers shall be in an amount equal to not less than one hundred percent (100%) of the contract price. Form of bond required maybe examined at the office of the Director of Public Works; copies will be furnished, if desired, to prospective bidders.
Payment and performance Bonds shall be executed by a California Admitted Surety insurer with a minimum Best’s Insurance Guide rating of A+, Class VII.
Whenever any surety or sureties on any such bond, or on any bonds required by law for the protection of the claims of laborers and material men, become insufficient or the City Council has cause to believe such surety or sureties have become insufficient, a demand in writing may be made of the contractor for such further bond or bonds or additional surety, not exceeding that originally required, as is considered necessary, considering the extent of the work remaining to be done. Thereafter, no payment shall be made upon such contract to the contractor or any assignee of the contractor until such further bond or bonds or additional surety has been furnished.
12. Compliance with Laws and Regulations: No bid for work will be accepted from a Contractor who is not licensed in accordance with the law under the provisions Business and Professions Code §§7000 et seq., as amended. The contractor awarded the contract shall also submit the contractor’s Certification of Qualifications for License Classification contained in these contract documents along with the submission of the executed contract and acceptable sureties. All bids submitted and all contracts awarded hereunder must be submitted, filed, made and executed in accordance with all applicable laws of the State of California
17.b
Packet Pg. 292 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
8 and of the United States of America which relate to bids and contracts of the nature referred to herein, whether such laws are expressly referred to herein or not.
13. MINIMUM WAGES: Pursuant to Federal Decision AG 3295 and in accordance with the provisions of Labor Code §§1770 through 1781, the City Council of the City of El Centro has adopted the latest publication of the General Prevailing Wage Rates entitled “State of California, Department of Transportation, Equipment Rental Rates and General Prevailing Wage Rates.”
14. Bid Protest Provisions:
By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. With the express written agreement of the City and Bidder, and subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City's determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of the documents accompanying that notice; or (ii) a proposed award recommendation protest.
A. Solicitation Phase Protest. The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a free and open competition has not taken place or that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the City of its concerns by submitting a detailed Solicitation Protest Statement in accordance with the requirements set forth below in this Section A. The Protest does not replace the requirement to report irregularities in the bid documents.
(1) Contents and Requirements
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) calendar days prior to the Bid due date, and must contain all of the following to be considered:
a) The name, address, and telephone number of the protestor; and b) The Project Name and Project Number; and
c) A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish the merits of the protest; and
d) The desired resolution to the protest.
If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document. (2) Evaluation and Determination
No hearing will be held on the protest. City's Purchasing Office and City Manager, will review the
17.b
Packet Pg. 293 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
9 protest and any supporting material and conduct an investigation of the facts. He/she may, but need not, request other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor.
The Community Services Director or designee shall issue a final written decision regarding any solicitation protest to each Bidder prior to Bid opening. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse.
B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids any unsuccessful Bidder, may protest City's proposed award of the Contract by submitting a protest to the Purchasing Officer and City Manager within ten (10) business days after the award by the Purchasing Officer. That protest must be submitted in a timely manner, signed by the protesting Bidder, must and contain all of the following to be considered:
a) The name, address and telephone number of the protestor; and b) The Project Name and Project Number; and
c) The City action or recommendation that is being protested; and d) A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts of the bid documents; and
e) A clear statement of the relief request.
A protest does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protest is a public document.
Award Protest Statements are public documents. City will notify the affected parties when a protest has been submitted, and will provide copies of the protest to the affected parties as soon as is reasonably practical.
(2) Evaluation and Determination
The affected parties may file responsive statements in support of or in opposition to the protest within three (3) business days after the receipt of the protest from City. The Community Services Director, or designee, shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties.
Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Purchasing Officer and City Manager, shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.
C. Delay in Award
17.b
Packet Pg. 294 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
10 Execution of any proposed contract shall be delayed pending the resolution of the protest unless one or more of the following conditions is present:
1. The items or services being procured are urgently required;
2. Delivery or performance will be unduly delayed by failure to make award promptly; or
3. Failure to make prompt award will otherwise cause undue harm to City.
D. No Limitation on Remedies
Nothing contained herein shall be construed to act as a limitation on City’s choice of remedies or confer any right upon any interested party or affected party to a remedy.
E. Basis for Choice of Remedy
In determining the appropriate remedy, the City shall consider all the circumstances surrounding the notice of bids and/or award, including, but not limited to:
1. The seriousness of any deficiency found to exist in the contracting process;
2. The effect of the action on the competitive process;
3. Any urgency surrounding the requirement to enter into a contract; and
4. The effect that implementing the remedy will have on the City.
F. Remedies
If the City determines that the award or proposed award was not made in accordance with applicable statutes, regulations, policies and/or procedure, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:
1. Prior to award, City may issue a new solicitation, make a new selection/award recommendation, or award the contract consistent with applicable statutes, regulations, policies and procedures;
2. In its sole discretion, take no further action; or
3. Take any other action that is permitted by law to promote compliance.
19. Liquidated Damages: Provisions for liquidated damages, if any, are set out in the Agreement.
20. Workers’ Compensation Requirement. The Bidder must be aware that in accordance with California Labor Code Section 3700, if awarded the contract, the bidder must secure the payment of compensation to its employees and execute the Workers’ Compensation Certification in the form included in the bid documents, or execute a statement that the bidder has no employees.
END OF BID REQUIREMENTS
17.b
Packet Pg. 295 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
11 GENERAL CONDITIONS
1-01 DEFINITIONS.
(a) The word “City” shall mean the City of El Centro, California. (b) The term “City Council” shall mean the City Council of the City of El Centro. (c) The word “Contractor” shall mean the party of the second part entering into the contract with the City for the performance of work required by these specifications, and legal representatives of said party, or agent appointed to act for said party in the performance of the work. Said party is referred to throughout the contract documents as if of the singular number and the masculine gender. (d) The term “Director of Public Works” shall mean the City’s Director of Public Works/City Engineer, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.
1-02 CONTRACT DOCUMENTS
The Notice of Inviting Bids, the Instructions to Bidders, the Bid, the Specifications, and the Drawings, together with the Agreement, constitute the Contract. These Contract documents are complementary, and what is called for in any one shall be as binding as if called for in all. The intention of the documents is to require a complete and finished piece of work. The Contractor at its sole cost and expense shall perform all labor and services and shall furnish all materials, tools, equipment, and facilities necessary for the proper execution of the work, with the exception of such items as are definitely set forth in the specifications or the drawings to be furnished by the City.
Anything shown in the drawings and not in the specifications or in the specifications and not in the drawings shall be performed by the Contractor as though shown in both the drawings and the specifications. 1-03 AUTHORITY OF THE DIRECTOR OF PUBLIC WORKS
The Director of Public Works shall give all orders and directions contemplated under the contract; shall determine the adequacy of the Contractor's methods, plans, and appurtenances; shall determine in all cases the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for; shall determine all questions in relation to said work and the construction thereof; and shall decide in all cases every question, which may arise relative to the fulfillment of this contract on the part of the Contractor. Should any discrepancy appear or any misunderstandings arise as to the import of anything contained in the specifications or drawings, the matter shall be referred to the Director of Public Works, who shall decide the same in accordance with the true intent and meaning as construed by him, and his decision shall be binding on the Contractor. Any differences or conflicts which may arise between the Contractor and other contractors of the City in regard to their work shall be adjusted and determined by the Director of Public Works.
1-04 ACCESS TO WORK
The Director of Public Works, with assistants, inspectors, agents, and other employees shall at all times and for any purposes have access to the work and the premises used by the Contractor, and the Contractor shall provide safe and proper facilities therefore.
1-05 LINES AND GRADES
All distances and measurements are given and will be made in horizontal plane. Grades are given from the top stakes, or nails, unless otherwise noted on the plans.
Three (3) consecutive points shown in the same rate of slope must be used in common, in order to detect any
17.b
Packet Pg. 296 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
12 variation from a straight grade, and in case any such discrepancy exists, it must be reported to the Director of Public Works. If such a discrepancy is not reported to the Director of Public Works, the Contractor shall be responsible for any error in the finished work.
The Contractor will preserve all stakes and points set for lines, grades or measurements of the work in their proper places until authorized to remove them by the Director of Public Works. All expenses incurred in replacing stakes that have been removed without proper authority shall be paid by the Contractor. 1-06 CONCRETE FORMS, FALSEWORK, AND SHORING
The Contractor shall comply fully with the requirements of Section 1717 of the construction Safety Orders, State of California, Department of Industrial Relations, regarding the design of concrete forms, falsework and shoring, and the inspection of same prior to placement of concrete. Where the said Section 1717 requires the services of a civil engineer registered in the State of California to approve design calculations and working drawings of the falsework or shoring system, or to inspect such system prior to placement of concrete, the Contractor shall employ a registered civil engineer for these purposes, and all costs therefore shall be included in the price named in the Contract for completion of the work as set forth in the Contract Documents. 1-07 REMOVAL, RELOCATION, OR PROTECTION TO EXISTING UTILITIES (a) In accordance with the provisions of Government Code §4215, any contract to which a public agency as defined in Government Code §4401 is a party, the public agency shall assume the responsibility, between the parties to the contract, for the timely removal, relocation, or protection of existing main or trunkline utility facilities located on the site of any construction project that is a subject of the contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids.
The agency will compensate the Contractor for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy and for equipment on the project necessarily idled during such work.
(b) The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the public agency or the city of the utility to provide for removal or relocation of such utility facilities.
(c) Nothing herein shall be deemed to require the public agency to indicate the presence of existing service laterals or appurtenances when the presence of such utilities on the site of the construction project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on or adjacent to the site of construction; provided, however, nothing herein shall relieve the public agency from identifying main or trunklines in the plans and specifications. (d) If the Contractor while performing the contract discovers utility facilities not identified by the public agency in the contract plans or specifications, he shall immediately notify the public agency and utility in writing.
(e) The public utility, where they are the city, shall have the sole discretion to perform such repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. 1-08 LEGAL ADDRESS OF CONTRACTOR
The address given in the Contractor's bid on which the contract is founded is hereby designated as the place to which all notices, letters, and other communications to the Contractor shall be mailed or delivered. The mailing to or delivering at the above-named place of any notice, letters, or other communication to the Contractor shall be deemed sufficient service thereof upon the Contractor. The date of said service shall be the date of such mailing or delivery. Such address may be changed at any time by a written notice signed by the Contractor and delivered to the Director of Public Works.
17.b
Packet Pg. 297 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
13 1-09 CONTRACTOR LICENSE REQUIREMENTS
In accordance with Business and Professions Code §7028.15, a licensed contractor shall not submit a bid to a public agency unless his or her contractor's license number appears clearly on the bid, and the license expiration date is stated. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered nonresponsive and shall be rejected by the public agency. 1-10 CONTRACTOR’S RESPONSIBILITIES
(a) The Contractor shall be responsible for safe, efficient, and adequate methods and equipment during the progress of the work so as to secure the safety of the workers, the quality of work required and the agreedupon rate of progress. (b) The Contractor shall bear all losses resulting to him on account of the amount or character of the work, or from any unforeseen obstructions or difficulties, which may be encountered, on account of the weather, floods, or other causes.
(c) The Contractor shall assume the defense of and indemnify and save harmless the City and its officers and agents from all claims of any kind arising from his own negligence or that of his agents in the performance of the contract.
(d) The Contractor shall be responsible for any materials furnished him and for the care of all work until its completion and final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work, or the same may be done at his expense by the City. (e) During the progress of the work the Contractor shall keep the premises occupied by him in a neat and clean condition, and free from any unsightly accumulation of rubbish, unused material, concrete forms, and other equipment and materials belonging to him or used under his direction during construction, and in the event of his failure to do so, the same may be removed by the City at the expense of the Contractor. (f) Traffic Control. The Contractor shall be responsible for maintaining traffic control at all times under the guidelines of the California Manual on Uniform Traffic Control Devices (“California MUTCD”).
Contractor shall submit two (2) traffic control plans in a minimum of two (2) business weeks for preapproval by the Director of Public Works before starting construction work. 1-11 CONTRACTOR TO FURNISH INFORMATION
(a) Before proceeding with the erection of the construction plant, and other temporary structures, the Contractor shall furnish the Director of Public Works with information and drawings of all such structures as may be required.
(b) Drawings and prints in such detail as may be required, or articles, machinery, or fabricated materials entering into permanent construction which are by these specifications required to be furnished by the Contractor and of which detailed drawings are not furnished by the City shall be submitted by the Contractor for approval and shall become the property of the City. Such approval shall not, however, operate to waive or modify any provision or requirement contained in these specifications. 1-12 EXAMINATION OF WORK
Bidders must examine the location, physical conditions and surroundings of the proposed work and judge for themselves the nature of the excavations to be made and the work to be done.
The Contract documents for the work show conditions as they are supposed or believed by the Director of Public Works to exist, but it is not intended or to be inferred that the conditions as shown therein constitute a representation
17.b
Packet Pg. 298 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
14 or warranty, express or implied, by the City or any of its officers or employees, that such conditions are actually existent, nor shall the Contractor be relieved of the liability under his contract, nor shall the City or any of its officers or employees be liable for any loss sustained by the Contractor as a result of any variance between conditions shown in the Contract Documents and the actual conditions revealed during the progress of the work or otherwise. 1-13 PLANS AND DRAWINGS
All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. No changes shall be made of any plan or drawing after the same has been approved by the Director of Public Works, accept by direction of the Director of Public Works.
Deviations from the approved plans, as may be required by the exigencies of construction, will be determined in all cases by the Director of Public Works and authorized in writing.
Working drawings or plans for any structure not included in the plans furnished by the Director of Public Works shall be approved by the Director of Public Works before any work involving these plans shall be performed, unless approval is waived in writing by the Director of Public Works.
It is mutually agreed, however, that approval by the Director of Public Works of the Contractor's working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall conform to the approved plans and specifications. 1-14 PERSONAL ATTENTION
The Contractor shall give its personal attention constantly to the faithful prosecution of the work, and shall be present, either in person or by a duly authorized and competent representative, on the site of the work, continually during its progress, to receive directions or instructions from the Director of Public Works. Whenever the Contractor is not present on any part of the work where it may be desired to give directions, orders may be given by the Director of Public Works, and shall be received and obeyed by the superintendent or foreman who may have charge of the particular part of the work in reference to which orders are given. 1-15 PROTESTS AFTER AWARD OF CONTRACT
If the Contractor considers any work demanded of him to be outside the requirements of the Contract, or if he considers any order or ruling of the Director of Public Works or of any inspector to be unfair, it shall immediately upon such work being demanded or such order or ruling being made, ask for written instructions or decision, whereupon he shall proceed without delay to perform the work or conform to the order or ruling; but unless the Contractor finds such instructions or decision satisfactory, he shall, within ten (10) days after receipt of same, file a written protest with the Director of Public Works, stating clearly and in detail his objections and the reason therefore. Except for such grounds of protest or objections as are made of record in the manner specified and within the time stated herein, the Contractor hereby waives all grounds for protests or objections to the orders, ruling, instructions or decisions of the Director of Public Works, and hereby agrees that as to all matters not included in such protests the orders, instructions and decisions of the Director of Public Works shall be final and conclusive. 1-16 RIGHT-OF-WAY
The right-of-way for the work to be constructed will be provided by the City. The Contractor shall make its own arrangements and pay all expenses for additional area required by him outside of the limits of the right-of-way, unless otherwise provided in the special conditions.
1-17 TIME AND ORDER OF WORK
(a) The Contractor shall at all times employ such force, plant, materials and tools as will be sufficient, in the opinion of the Director of Public Works, to complete the work or any separable portions thereof in accordance with a progress schedule and within the time limit fixed by the contract. If the Contractor
17.b
Packet Pg. 299 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
15 should fail to employ sufficient force, plant, materials and tools or to maintain adequate progress he may, after such failure, be required to increase his progress at any point or points or to modify his plans and procedures in such manners and to such extent as the Director of Public Works may direct, any extension of such shall not relieve the Contractor from the necessity of maintaining the required progress. In case of an extension by the Director of Public Works of the time for the completion of the contract, as hereinafter provided a revised schedule of progress may be prescribed in accordance with such extension of time. (b) The time in which the various portions and the whole of the contract are to be performed and the work is to be completed is of the essence of the contract.
1-18 ASSIGNMENT FORBIDDEN
The Contractor shall not assign, transfer, convey, or otherwise dispose of this contract, or of its right, title or interest in or to the same or any part thereof, without the previous consent in writing of the Director of Public Works and it shall not assign, by power of attorney or otherwise, any of the monies to become due and payable under the contract unless by and with the like consent signified in like manner. If the Contractor shall, without such previous written consent, assign, transfer, convey or otherwise dispose of the contract or of its right, title or interest therein, or of any of the monies to become due under the contract, to any other person, company or other corporation, then the contract may, at the option of the City, be terminated and revoked, and the City shall thereupon be relieved and discharged from any and all liability and obligations growing out of the same to the Contractor, and to his assignee or transferee.
No right under the contract, nor any right to any money to become due hereunder, shall be asserted against the City in law or equity by reason of any so-called assignment of the contract, or any part thereof, or by reason of the assignment of any monies to become due hereunder, unless authorized as aforesaid by the written consent of the Director of Public Works.
1-19 SUBLETTING
The Contractor shall give personal attention of the fulfillment of the contract and shall keep the work under its control. Subcontractors will not be recognized as such, and all persons engaged in the work of construction will be considered as employees of the Contractor, and their work shall be subject to the provisions of the contract and specifications. Where a portion of the work sublet by the Contractor is not being prosecuted in a manner satisfactory to the Director of Public Works, the subcontractor shall be removed immediately on the recommendation of the Director of Public Works and shall not again be employed on the work. 1-20 SUSPENSION OF CONTRACT
(a) If the work to be done under the contract shall be abandoned by the Contractor, or if the Contractor shall make a general assignment for the benefit of creditors or be adjudicated a bankrupt, or if a receiver of its property or business is appointed by a court of competent jurisdiction, or if this contract shall be assigned by him otherwise than hereinbefore specified, or if at any time the Director of Public Works shall be of the opinion that the performance of the contract is unnecessarily or unreasonably delayed, or that the Contractor is willfully violating any of the conditions or covenants of the contract, or of the specifications, or is executing the same in bad faith or not in the time named in the contract for its completion, or within the time to which the completion of the contract may have been extended as hereinbefore provided, the Director of Public Works, acting on behalf of the City, may, by written notice, instruct the Contractor to discontinue all work or any part thereof under this contract.
(b) When such written notice is served upon the Contractor as provided in Section 1-06, it shall immediately discontinue the work or such part thereof as is covered by the notice and shall not resume the same except by written instructions from the Director of Public Works. In any such case, the City may take charge of the work and complete it by a new contract or by force account. In so doing, the City may take possession of and use any of the materials, plant, tools, equipment, supplies and property of every kind provided by the Contractor for the purposes of his work. The City may procure other materials and provide labor for
17.b
Packet Pg. 300 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
16 the completion of same, or contract therefore and charge the expense of completion by either method to the Contractor. These charges shall be deducted from such monies as may be due or may at any time hereafter become due the Contractor under and by virtue of this contract or any part thereof. In case such expense shall exceed the amount which would have been due the Contractor under the contract if the same had been completed by him, he shall pay the amount of such excess to the City; and in case such expense shall be less than the amount which would have been payable under this contract if the same had been completed by the Contractor, he shall have no claim to the difference except to such extent as may be necessary, in the opinion of the Director of Public Works, to reimburse the Contractor or the Contractor's sureties for any expense, properly incurred for plant, equipment, materials, supplies and labor devoted to the prosecution of the work of which the City shall have received the benefit and which shall not have been otherwise paid for by the City. In computing such expense so far as it shall be deducted from the depreciated value thereof at the time taken over by the City and the difference shall be considered as an expense. Evidence of such expense satisfactory to the Director of Public Works, shall be required, and all necessary estimates and appraisements shall be made by him.
When any particular part of the work is being carried on for the City by contract or otherwise, under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of his contract, and in such manner as in nowise to hinder or interfere with the persons or workers employed, as above provided, by the City, by contract or otherwise to do any part of the work or to complete the same under the provisions of this section.
1-21 SUSPENSION OF WORK – EXTENSION OF TIME – NO EXTRA COMPENSATION (a) The Director of Public Works shall have the authority to suspend the work wholly or in part, for such period as may be deemed necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the work or for such time as may be necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the work. The Contractor shall immediately obey such order of the Director of Public Works. (b) Applications for extension of time must be made promptly in writing, stating cause. No delay shall be made the basis in any application for extension of time, unless such delay and the cause thereof shall have been called to the attention of the Director of Public Works in writing within the ten (10) days from the beginning of such delay. Applications for extension of time shall be addressed to the Director of Public Works. (c) Permitting the Contractor to continue and finish the work, or any part of it, after the date to which the time fixed for its completion may have been extended, shall in nowise operate as a waiver on the part of the City or any of its rights under this contract.
(d) The Contractor shall receive no compensation on account of any suspension of the work either in whole or in part or for any delay or hindrance herein mentioned except as provided in the Detail Specifications or as otherwise required by law.
1-22 FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES (a) The Contractor shall pay for each and every day, including Sundays and legal holidays that they shall be in default in completing the whole work to be done under this Contract, the sum named in the Special Provisions, which sum is by the execution of the Agreement mutually agreed upon as liquidated damages which the City will suffer by reason of such default. The City shall have the right to deduct the amount of such damages from any monies due or to become due the Contractor under this contract. (b) It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the time specified, the City Council shall have the right to extend the time for completion or not, as may seem best to serve the interest of the City; and if it decides to extend the time limit for the completion of the contract, it shall further have the right to charge to the Contractor, his heirs, assigns or sureties and to deduct from the final payment for the work, all or any part, as it may deem proper
17.b
Packet Pg. 301 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
17 of the actual cost of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final surveys and preparation of final estimate shall not be included in such charges. (c) The Contractor shall not be assessed with liquidated damages nor the cost of engineering and inspection during any delay in the completion of the work caused by the acts of God or of the public enemy, acts of the City, fire, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather or delays of subcontractors due to such causes; provided, that the Contractor shall within ten (10) days from the beginning of any such delay notify the Director of Public Works in writing of the causes of delay, who shall ascertain the facts and the extent of delay, and his findings of the facts thereon shall be final and conclusive.
1-23 CHANGES
(a) If either the Director of Public Works or the Contractor on account of conditions that develop during the progress of the work finds it impracticable to comply strictly with these specifications, the Director of Public Works may prescribe a modification of requirements of methods of work. For such purposes, the Director of Public Works may at any time during the life of the contract, by written order make such changes as shall be necessary in the design, line, grade, form, location, dimensions, plan or material of any part of the work or equipment hereinafter specified, or in the quantity or character of the work or equipment to be furnished. If such changes increase or diminish the quantity or amount of work to be done, they shall not constitute the basis for a claim for damages, delay damages or anticipated profits on the work that may be dispensed with; provided, that if such changes or alterations render useless any work already done or materials already furnished or used in the work, the Director of Public Works shall make reasonable allowance therefore, which action shall be binding upon both parties. (b) In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the contract, wherever such unit price has been established. In the event no prices are named in the contract to cover such changes or alteration, the cost of such changes shall be covered as hereinafter provided for extra work.
(c) The City reserves the right to increase or decrease the quantity of any item or portion of work or to omit portions of the work as may be deemed necessary or expedient by the Director of Public Works. 1-24 EXTRA WORK
(a) If during the performance of the contract, it shall, in the opinion of the Director of Public Works, become necessary or desirable for proper completion of the contract to order work done or materials or equipment furnished which in the opinion of the Director of Public Works are not susceptible of classification under the bid items, the Contractor shall do and perform such work and furnish such materials and equipment as extra work, as hereinafter provided. All extra work shall be ordered in writing before it is started. No extra work shall be paid for unless ordered in writing. (b) Extra work will ordinarily be paid for at a lump sum or unit price agreed upon in writing by the Director of Public Works and the Contractor before the extra work shall be ordered. (c) Whenever in the judgment of the Director of Public Works extra work or extra material, as the case may be, is not of like character to and is not susceptible of classification under the bid items of the contract as specified, and it is impracticable because of the nature of the work, or for any other reason to fix the price before the extra work order shall be issued, extra work and material, when furnished by the Contractor, shall be paid for at actual necessary cost of materials, supplies, labor (including foremen’s wages), workers’ compensation insurance, contributions made to the State as required by the provisions of the Unemployment Insurance Act, Chapter 352, Statutes of 1935, as amended, taxes paid to the Federal Government as required by The Social Security Act, approved August 14, 1935, as amended and the
17.b
Packet Pg. 302 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
18 reasonable value of the use of equipment for the actual time it is used, all as determined by the Director of Public Works, plus fifteen percent (15%) to cover the following:
Profit
General Expenses
All insurance except workers’’ compensation insurance
Excise taxes
Property taxes
Bond premiums
License and inspection fees imposed by any governmental authority Any and all other items of expense not specifically mentioned under subsection (c), herein The Director of Public Works determination and certification of said actual necessary cost shall be binding and conclusive on the Contractor, and the Director of Public Works shall be deemed the arbiter to determine the cost of such work.
(d) If any work or materials be ordered under this section on a cost-plus basis, the Contractor shall, at the times directed during the performing of the work or the furnishing of the materials, render to the Director of Public Works, written reports in prescribed form, showing all items that may enter into the cost, the quantity and the character of each such material, from whom purchased and the net amount paid or to be paid therefore, and such other information as directed. If required, the Contractor shall produce any books, vouchers, other records, or memoranda, which will assist the Director of Public Works in determining the true, necessary cost of the work and materials to be paid for. (e) Any extra work performed hereunder shall be subject to all the provisions of the contract and the Contractor’s sureties shall be bound with reference thereto as under the original contract. 1-25 COST BREAKDOWN
Within ten (10) days after commencing work, the Contractor shall submit, to the Director of Public Works, a cost breakdown in duplicate of all unit and lump sum prices under the contract. The breakdown, as approved, may be used by the Director of Public Works to verify the fair value of the work for progress payments. 1-26 PROGRESS ESTIMATES
The Director of Public Works, shall on or about the fifth (5th) day of each calendar month, except as provided in Section 1-23, make in writing and certify to the City Clerk an estimate such as in his opinion shall be just and fair, of the amount and value of the work done by the Contractor and of the amount and value of all acceptable materials furnished and delivered by the Contractor to the site and not used up to that time in the performance of the contract.
To the figure thus arrived at, shall be added any amounts due the Contractor for extra work and the amount of any approved claims for extra cost to the date of the progress estimate.
A deduction of five percent (5%) shall be made from the estimated value of the work done and fifty percent (50%) of the value of the materials so estimated to have been furnished and delivered and unused, and from the remainder there shall be further deducted any amounts due the City from the Contractor for supplies or materials furnished or services rendered and any other amounts that may be due the City under the terms of the Contract. From the balance thus determined shall be deducted the amount of all previous payments and the remainder shall constitute the progress estimate for that month.
Such progress estimates shall not be required to be made by strict measurement, but they may be made by measurement or by estimation, or partly by one method or partly by the other, and it shall be sufficient if they are approximate only.
1-27 RETAINAGE FROM MONTHLY PAYMENTS
17.b
Packet Pg. 303 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
19 Pursuant to Public Contract Code §22300, the Contractor may substitute securities for any money withheld by the City to insure performance under the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally charted bank as the escrow agent, who shall return such securities to the Contractor upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to a written agreement between the escrow agent and the City which provides that no portion of the securities shall be paid to the Contractor until the City has certified to the escrow agent, in writing, that the Contract has been satisfactorily completed. The City will not certify that the Contract has been satisfactorily completed until at least thirty (30) days after filing by the City a Notice of Completion. Securities eligible for investment under Public Contract Code §22300 shall be limited to those listed in Government Code §16430 and to bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City. 1-28 PROGRESS ESTIMATES MAY BE WITHHELD
The progress estimates provided for in Section 1-26 hereof may at any time be withheld or reduced if, in the opinion of the Director of Public Works, the Contractor is not diligently and efficiently endeavoring to comply with the intent of the contract, or if the Contractor shall fail to pay his labor and material bills as they become due. 1-29 PROGRESS PAYMENTS
(a) Upon each progress estimate being made and certified in writing, the City shall, within fifteen (15) days after the date of such estimates, except as set forth in subsection (b) hereof, pay to the Contractor the amount stated in such estimates to be due the Contractor; provided, however, that the City may at all times reserve and retain from such progress payments, in addition to the retained percentage and other amounts above mentioned to be deducted in computing the progress estimated, any sum or sums which by the terms hereof, or of any law of the State of California, it is or may be authorized or required to reserve or retain; and provided further, that no progress estimate or progress payment shall constitute an acceptance of the work or any portion thereof. The percentage deducted as above set forth shall become due and payable with and as a part of the final payment to be made as hereinafter provided. (b) In the event the contract or any part thereof shall be suspended as provided in Section 1-20, the retained percentage as provided in Section 1-26, shall become the sole and absolute property of the City to the extent necessary to repay to the City any excess in the cost of the work above the contract price. After issuance of notice to discontinue work, no payments upon progress estimates or otherwise shall thereafter be made the Contractor for the work covered by said notice until completion of the work. 1-30 FINAL ESTIMATE AND PAYMENT
(a) Whenever in the opinion of the Director of Public Works the Contractor shall have completely performed the contract on his part, the Director of Public Works will submit to the Contractor a written statement of the final quantities of contract items for inclusion in the final estimate. The Contractor will be expected to submit his written approval of said proposed final quantities within five (5) days of receipt of the Director of Public Works' statement, or in the event the Contractor disagrees with such written statement, shall within said period of five (5) days file a written statement of all claims, which he intends to present. (b) Upon receipt from the Contractor of written approval of the final quantities or such written statement of his claims, the Director of Public Works shall make in writing and certify to the City Clerk an estimate in which he shall state, from actual measurements, the whole amount of work done by the Contractor and also the value of such work under and according to the terms of the contract. Within ten (10) days after the date of receipt of the aforesaid approval or state of claims, the Director of Public Works shall cause to be filed, on behalf of the City, in the Office of the Imperial County Recorder, a Notice of Completion of the work herein agreed to be done by the Contractor. On the expiration of thirty-five (35) days after the filing of such notice of completion of the work, the City shall pay to the Contractor the amount remaining after deducting from the amount of value stated in the first mentioned estimate all prior payments to the Contractor and all amounts to be kept and retained under the provisions of the contract.
17.b
Packet Pg. 304 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
20 (c) All prior estimates upon which partial payments have been made shall be subject to correction in the final estimate. The final estimate and payments made thereunder shall be final and conclusive upon the Contractor.
1-31 PUBLIC WORKS CONTRACTS: ASSIGNMENT TO AWARDING BODY In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec.. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professional Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgement by the parties. 1-32 RECOVERY OF DAMAGES
The making of an estimate and payment in accordance therewith shall not preclude the City from demanding and recovering from the Contractor such damages as it may sustain by reason of his failure to comply with the specifications.
1-33 FINAL PAYMENT TERMINATES LIABILITY
The acceptance by the Contractor of the final payment aforesaid shall be a release to the City and its agents from all claim and liability to the Contractor for anything done or furnished for or relating to the work or for any act or neglect of the City or of any person relating to or affecting the work except the claim against the City for the remainder, if any, of the amount kept or retained as provided in Section 1-31. 1-34 NO PERSONAL LIABILITY
No agent of the City shall be personally responsible for any liability arising under the Contract. No claims shall be made or filed and neither the City nor any of its agents shall be liable for or held to pay any money, except as specifically provided in the contract.
1-35 MONIES MAY BE RETAINED
The City may keep any monies which would otherwise be payable at any time hereunder and apply the same, or so much as may be necessary therefore, to the payment of any expense, losses or damages as determined by the Director of Public Works incurred by the City for which the Contractor is liable under the contract. 1-36 UNPAID CLAIMS
If, at any time prior to the expiration of the period for service of a stop notice, there is served upon the City a stop notice as provided in Civil Code §§9350 et seq., the City shall, until the discharge thereof, withhold from the monies under its control so much of said monies due or to become due to the Contractor under this Contract as shall be sufficient to answer the claim stated in such stop notice and to provide for the reasonable cost of any litigation thereunder; provided, that if the Construction Manager shall, in its discretion, permit Contractor to file with the City the bond referred to in Civil Code §9364, said monies shall not thereafter be withheld on account of such stop notice.
1-37 ADDITIONAL SURETY
If during the continuance of the contract, any of the sureties upon the faithful performance bond in the opinion of the Director of Public Works are/or become insufficient, he may require additional sufficient sureties which the Contractor shall furnish, to the satisfaction of the Director of Public Works, within fifteen (15) days after notice and
17.b
Packet Pg. 305 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
21 in default thereof the contract may be suspended and the work completed as provided in Section 1-20 hereof. 1-38 STATE WAGE DETERMINATIONS
(a) As required by Labor Code §§1770 et seq., the Contractor shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the City, which copies shall be made available to any interested party on request. The Contractor shall post a copy of such determination at each job site.
(b) Attention is directed to the Federal minimum wage rate requirements in the Contract Documents. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate.
The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes “helper” (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. (b) In accordance with Labor Code §1775, the Contractor shall, as a penalty to the City, forfeit not more than two hundred dollars ($200) for each calendar day or portion thereof, for each worker paid less than the prevailing rates as determined by the Director for the work or craft in which the worker is employed for any public work done under the contract by him or her or by any subcontractor under him or her. 1-39 PAYMENT OF WAGES
The issuance as payment for wages of any evidence of indebtedness is prohibited unless the same is negotiable and payable on demand without discount. Wages must be paid at least semi-monthly on regular pay days established in advance, and shall include all amounts for labor or services performed by employees of every description as required under the provisions of the California Labor Code. 1-40 WORKING HOURS
The Contractor shall comply with all applicable provisions of Labor Code §§1810 to 1815, inclusive, relating to working hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the execution of the Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one (1) calendar week, unless such worker receives compensation for all hours worked in excess of eight (8) hours at not less than one and one-half (1.5) times the basic rate of pay. 1-41 OVERTIME - NO EXTRA COMPENSATION
Overtime work (i.e., work in excess of eight (8) hours in any one (1) calendar day or work performed on a Sunday or other legal holiday) shall not entitle the Contractor to any compensation for any contract item in addition to that set forth in the Contract for the kind of work performed even though such overtime or legal holiday work may be required under emergency conditions, and may be ordered by the Director of Public Works in writing. In case of extra work ordered by the Director of Public Works under the provisions of Section 1-24 hereof, no additional payment will be made to the Contractor because of the payment by him of overtime or legal holiday rates for such work, unless the use of overtime or legal holiday work in connection with such extra work is specifically ordered in writing by the Director of Public Works and then only to such extent as extra payment is regularly being made by the Contractor to his workers for overtime or legal holiday work of a similar nature in the same locality. 1-42 WORKERS’ COMPENSATION
17.b
Packet Pg. 306 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
22 a) In accordance with the provisions of Labor Code §3700, the Contractor shall secure the payment of compensation to his employees.
b) Prior to beginning work under the Contract, the Contractor shall sign and file with the City the following certification:
“I am aware of the provisions of Section 3700 of the Labor Code which require employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of the Contract.”
(c) Notwithstanding the foregoing provisions, before the Contract is executed on behalf of the City, a bidder to whom a contract has been awarded shall furnish satisfactory evidence that it has secured in the manner required and provided by law the payment of workers’ compensation. 1-43 CHARACTER OF WORKERS
None but skilled workers shall be employed on work requiring special qualifications. When required in writing by the Director of Public Works, the Contractor or any subcontractor shall discharge any person who is in the opinion of the Director of Public Works, incompetent, unfaithful, disorderly or otherwise unsatisfactory and shall not again employ such discharged person on the work except with the consent of the Director of Public Works. Such discharge shall not be the basis of any claim for compensation or damage against the City or any of its officers. 1-44 PAYROLL RECORDS; RETENTION; INSPECTION; NONCOMPLIANCE PENALTIES; RULES AND
REGULATIONS
(a) In accordance with Labor Code §1776, the Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work on the following basis:
1. A certified copy of an employee’s payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request.
2. A certified copy of all payroll records enumerated in paragraph 1-44(a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations.
3. A certified copy of all payroll records enumerated in paragraph 1-44(a) shall be made available upon request by the public for inspection or copies thereof made; provided, however, that a request by the public shall be made through either the body awarding the contract, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph 1-44(a)(2) the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the Contractor, subcontractors, and the entity through which the request was made. The public shall not be given access to the records at the principal office of the Contractor. (b) Each Contractor shall file a certified copy of the records, enumerated in paragraph 1-44(a) with the entity that requested the records within ten (10) days after receipt of a written request. (c) Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of
17.b
Packet Pg. 307 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
23 an individual’s name, address, and social security number. The name and address of the Contractor awarded the contract or performing the contract shall not be marked or obliterated. (d) The Contractor shall inform the body awarding the contract of the location of the records enumerated under paragraph 1-44(a) including the street address, city and county, and shall, within five (5) working days, provide a notice of change of location and address.
(e) In the event of noncompliance with the requirements of this section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying in what respect the Contractor must comply with this Section. If non-compliance is still evident after the ten (10) day period, then the Contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty-five dollars ($25) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. 1-45 SAMPLES AND TESTS
At the option of the Director of Public Works, the source of supply of each of the materials shall be approved by the Director of Public Works before delivery is started and before such material is used in the work. Representative preliminary samples of the character and quality prescribed shall be submitted by the Contractor or producer of all materials to be used in the work for testing or examination as desired by the Director of Public Works.
All tests of materials furnished by the Contractor shall be made in accordance with commonly recognized standards of national organizations, and such special methods and tests are prescribed in these specifications.
The Contractor shall furnish such samples of materials as are requested by the Director of Public Works, without charge. No material shall be used until it has been approved by the Director of Public Works. Samples will be secured and tested whenever necessary to determine the quality of material. 1-46 INSPECTION
The Director of Public Works shall at all times have access to the work during construction, and shall be furnished with every reasonable facility for ascertaining full knowledge respecting the progress, workmanship and character of materials used and employed in the work.
Whenever the Contractor varies the period, which work is carried on each day, he shall give due notice to the Director of Public Works, so that proper inspection may be provided. Any work done in the absence of the Director of Public Works will be subject to rejection. The inspection of the work shall not relieve the Contractor of any of his obligations to fulfill the contract as prescribed. Defective work shall be made good and unsuitable materials may be rejected notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Director of Public Works and accepted or estimated for payment. 1-47 DEFECTIVE WORK OR MATERIALS
(a) If the work, or any part thereof, shall be found defective at any time before the final acceptance of the whole work, the Contractor shall forthwith make good such defects without compensation in a manner satisfactory to the Director of Public Works, and the cost of any excess material furnished by the City shall be borne by the Contractor.
(b) All materials not conforming to the requirements of these specifications shall be considered as defective and all such material whether in place or not shall be rejected and shall be removed immediately from the site of the work unless otherwise permitted by the Director of Public Works. No rejected material, the defects of which have been subsequently corrected shall be used until approved in writing by the Director of Public Works.
17.b
Packet Pg. 308 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
24 (c) Upon failure on the part of the Contractor to comply with any order of the Director of Public Works made under the provisions of this article, the Director of Public Works shall have authority to remove and replace defective material and to deduct the cost of removal and replacement from any monies due or to become due the Contractor.
1-48 USE OF COMPLETED PORTIONS
The City may at any time during progress of the work, after written notice to the Contractor, take over and place in service any completed portions of the work which are ready for service, although the entire work of the contract is not fully completed and notwithstanding the time for completion of the entire work or such portions which may not be expired. In case, the City shall issue certificates of acceptance for such portions of the work but such taking possession thereof shall not be deemed an acceptance of any other portion of the work, nor of any incomplete portions, nor of any work not completed in accordance with the contract documents. 1-49 PROPERTY RIGHTS IN MATERIALS
Nothing in this contract shall be construed as vesting in the Contractor any right of property in the materials used after they have been attached or affixed to the work or the soil or after payment has been made for the value of unused material delivered to the site of the work as provided for in Section 1-23 hereof. All such materials attached or affixed or unused shall become the property of the City. 1-50 TITLE TO MATERIALS FOUND ON THE WORK
The right to the use of all soil, stone, gravel, sand and all other materials and equipment developed or obtained in the excavation or other operations by the Contractor or any subcontractor or any of their employees and the right to use and/or dispose of the same are hereby expressly reserved in the City and neither the Contractor, nor any subcontractor nor any of their employees shall have any right, title or interest in or to any part thereof nor shall they, nor any of them, assert or make any claim thereto. The Contractor shall be permitted to use in the work, without charge, any such materials, which meet the requirements of these specifications. 1-51ENFORCEMENT OF ORDER
The Contractor shall be responsible for maintaining good order at the site where work is performed under this contract and to that end shall employ such watchmen or other persons as may be required. Unauthorized persons shall be excluded from the site of the work. The Contractor shall not sell, nor shall he permit or suffer the introduction or use of intoxicating liquors or narcotics upon the works embraced in these specifications or upon any of the grounds occupied or controlled by him in connection with such works. 1-52 PATENTS AND COPYRIGHTS
The Contractor shall hold and save the City, it officers, agents and employees harmless from liability of any nature and kind including costs and expenses for or on account of any copyrighted or un-copyrighted composition, secret process, patented or un patented invention, article or appliance manufactured, furnished or used by him in the performance of this contract, including their use by the City, unless otherwise specifically agreed upon in the contract.
1-53 LAWS AND REGULATIONS
(a) The Contractor shall keep himself fully informed of all Federal and State laws, County and City ordinances and regulations which in any manner affect those engaged or employed on the work or the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency should be discovered in this contract, or in the drawings or specifications herein referred to in relation to any such law, ordinance or regulation, he shall forthwith report the same in writing to the Director of Public Works.
He shall, at all times, observe and comply with and shall cause all his agents and employees to observe and
17.b
Packet Pg. 309 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
25 comply with all such applicable laws, ordinances and regulations in effect or which may become effective before completion of this contract. He shall protect and indemnify the City and its officers and agents against any claim or liability arising from or based on the violation of any such law, ordinance or regulation whether by himself or by his employees.
(b) Except as otherwise explicitly provided elsewhere in these specifications, all permits and licenses necessary to the prosecution of the work shall be secured by the Contractor at his own expense, and he shall pay all taxes properly assessed against his equipment or property used or required in connection with the work. (c) All federal laws and regulations now imposed by competent authority and relating to any materials required to be furnished under these specifications and work required to be done hereunder shall be deemed to be and hereby are made controlling and part of these specifications. 1-54 CULTURAL RESOURCES
The Contractor’s attention is directed to the provisions of the Clean Water Grant Program Bulletin 76A which augments the National Historic Preservation Act of 1966 (16 U.S.C. 470) as specified under Section 01560, “Temporary Environmental Controls” of the General Requirements. 1-55 PROTECTION OF WORKERS IN TRENCH EXCAVATIONS
As required by Labor Code §6705 and in addition thereto, whenever work under the Contract involves the excavation of any trench or trenches five (5) feet or more in depth, the Contractor shall submit for acceptance by the City or by a registered civil or structural engineer, employed by the City, to whom authority to accept has been delegated, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation, of such trench or trenches. If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed by the Contractor, and all costs therefore shall be included in the price named in the Contract for completion of the Work as set forth in the Contract Documents. Nothing in this Section shall be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this Section shall be construed to impose tort liability on the City, the Construction Manager, the Design Consultant or any of their officers, agents, representatives, or employees. 1-56 TRAVEL AND SUBSISTENCE PAY
a) As required by Labor Code §1773.1, the Contractor shall pay travel and subsistence payments to each worker needed to execute the Work, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with this Section. b) To establish such travel and subsistence payments, the representative of any craft, classification or type of worker needed to execute the contracts shall file with the Department of Industrial Relations fully executed copies of collective bargaining agreements for the particular craft, classification or type of work involved.
Such agreements shall be filed within ten (10) days after their execution and thereafter shall establish such travel and subsistence payments whenever filed thirty (30) days prior to the call for bids. 1-57 SALES AND/OR USE TAXES
Except as may be otherwise provided herein, all sales and/or use taxes assessed by Federal, State or local authorities on materials used or furnished by the Contractor in performing the work hereunder shall be paid by the Contractor. 1-58 CONTRACTOR NOT RESPONSIBLE FOR DAMAGE RESULTING FROM CERTAIN ACTS OF GOD As provided in Public Contract Code §7105, the Contractor shall not be responsible for the cost of repairing or restoring damage to the work which damage is determined to have been proximately caused by an act of God, in
17.b
Packet Pg. 310 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
26 excess of five (5%) percent of the contract amount, provided, that the work damaged was built in accordance with accepted and applicable building standards and the plans and specification of the City. The Contractor shall obtain insurance to indemnify the City for damages to the work caused by an act of God if the insurance premium as a separate bid item in the bidding schedule for the work. For purposes of this Section, the term “acts of God” shall include only the following occurrences or conditions and effects: earthquakes in excess of a magnitude of 3.5 on the Richter Scale and tidal waves.
1-59 RESPONSIBILITY FOR DAMAGE
(a) Indemnity Agreement
In addition and complementary to any other indemnification provided in these bid documents, and except for the active negligence or willful misconduct of an Indemnitee (as hereinafter defined), the Contractor hereby assumes liability for and shall defend (at Indemnitees’ option), indemnify, protect and hold harmless the City and its project consultants and engineers, officers, agents, and employees (“Indemnitees”) from and against any and all claims, charges, damages, demands, actions, proceedings, losses, stop notices, costs, expenses (including but not limited to attorney fees with counsel acceptable to the City), judgments, civil fines and penalties, liabilities of any kind or nature whatsoever, which may be sustained or suffered by or secured against the Indemnitees arising out of or encountered in connection with this Agreement or the performance of or failure to perform the work including, but not limited to, death of or bodily or personal injury to persons or damage to property, including property owned by or under the care and custody of the City, that may arise from or be caused, in whole or in part, by any negligent or other act or omission of the Contractor, its officers, agents, employees or subcontractors including, but not limited to, liability arising from:
1. Any dangerous, hazardous, unsafe or defective condition of, in or on the premises, of any nature whatsoever, which may exist by reason of any act, omission, neglect, or any use or occupation of the premises by the Contractor, its officers, agents, employees, or subcontractors;
2. Any operation conducted upon or any use or occupation of the premises by the Contractor, its officers, agents, employees, or subcontractors under or pursuant to the provisions of this contract or otherwise;
3. Any act, omission or negligence of the Contractor, its officers, agents, employees, or subcontractors;
4. Any failure of the Contractor, its officers, agents or employees to comply with any of the terms or conditions of this contract or any applicable federal, state, regional, or municipal law, ordinance, rule or regulation; and
5. The conditions, operations, uses, occupations, acts, omissions or negligence referred to in subsubsections (1), (2), (3), and (4), existing or conducted upon or arising from the use or occupation by the Contractor on any other premises in the care, custody and control of the City.
The Contractor also shall indemnify the City and pay for all damage or loss suffered by the City including but not limited to damage to or loss of the City’s property, to the extent not insured by the City and loss of the City’s revenue from any source, caused by or arising out of the conditions, operations, uses, occupations, acts, omissions or negligence referred to in sub-subsections (1), (2), (3), (4), and (5).
The Contractor’s obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of the City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City.
17.b
Packet Pg. 311 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
27 The Contractor shall obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of the Contractor in the performance of this Agreement. In the event the Contractor fails to obtain such indemnity obligations from others as required here, the Contractor shall be fully responsible according to the terms of this section.
Failure of the City to monitor compliance with these requirements imposes no additional obligations on the City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend the City as set forth here is binding on the successors, assigns or heirs of the Contractor and shall survive the termination of this Agreement or this section.
This Indemnity shall survive termination of the Agreement of Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other contract documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, the City may, in its sole discretion, reserve, retain or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, the City may release such funds if the Contractor provides the City with reasonable assurance of protection of the Indemnitees’ interests. The City shall, in its sole discretion, determine whether such assurances are reasonable.
(b) Insurance Requirements – see provisions of the Construction Agreement (c) Additional Requirements
1. The Contractor shall ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by the Contractor, provide the same minimum insurance coverage required of the Contractor. The Contractor shall monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. The Contractor agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to the City for review.
2. The Contractor agrees that all layers of third party liability coverage required herein, primary, umbrella and excess, will have the same starting and expiration date. The Contractor agrees further that all other third party coverages required herein will likewise have concurrent starting and ending dates.
3. The Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, architect, engineer or other entity or person in any way involved in the performance of work on the project contemplated by this agreement to self-insure its obligations to the City. If the Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions.
4. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City.
5. For purposes of applying insurance coverage only, all contracts pertaining to the project will be deemed to be executed when finalized and any activity commences in furtherance of performance under this Agreement.
6. The Contractor acknowledges and agrees that any actual or alleged failure on the part of the City
17.b
Packet Pg. 312 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
28 to inform the Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on the City nor does it waive any rights hereunder in this or any other regard.
7. The Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this agreement. This obligation applies whether or not the agreement is canceled or terminated for any reason. The insurance shall include but not be limited to products and completed operations and discontinued operations, where applicable. Termination of this obligation is not effective until the City executes a written statement to that effect.
8. The Contractor agrees to waive its statutory immunity under any workers’ compensation statute or similar statute, in relation to the City, and to require all subcontractors and any other person or entity involved in the project contemplated by this Agreement to do likewise.
9. Requirements of specific coverage features are not intended as limitations on other requirements or as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be all inclusive.
10. Any provision in any of the construction documents dealing with the insurance coverage provided pursuant to these requirements is subordinate to and superseded by the requirements contained herein. These insurance requirements are intended to be separate and distinct from any other provision in this agreement and are intended by the parties here to be interpreted as such.
11. All liability coverage provided according to these requirements must be endorsed to provide a separate aggregate limit for the project that is the subject of this agreement and evidencing products and completed operations coverage for not less than two (2) years after issuance of a final certificate of occupancy by all appropriate government agencies or acceptance of the completed work by the City.
12. The Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge the City or the Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto.
1-60 TRESPASS
The Contractor shall be responsible for all damage or injury, which may be caused on any property by trespass of the Contractor's employees in the course of their employment whether the said trespass was committed with or without the consent or knowledge of the Contractor.
1-61 SAFETY, SANITARY AND MEDICAL REQUIREMENTS
The Contractor and his subcontractors, if any, and employees shall promptly and fully carry out the existing safety, sanitary and medical requirements as may from time to time be prescribed by the City or by County or State Health Departments to the end that proper work shall be done and the safety and health of the employees and of the community may be observed and safeguarded. In case such regulations and orders are not observed by the Contractor they may be enforced by the Director of Public Works at the Contractor's expense. 1-62 PROTECTION AND CLEAN UP
The Contractor shall protect and care for all work until completion and acceptance thereof. Before the Contractor makes application for the acceptance of the work, all rubbish, excess earth and rock or surplus materials shall be
17.b
Packet Pg. 313 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
29 removed leaving the site in a neat, orderly and presentable condition. 1-63 LABOR DISCRIMINATION
No discrimination shall be made in the employment of persons upon public works because of the race, color, religion, religious creed, national origin, ancestry, disability (mental and physical) including HIV and AIDS, medical condition (cancer and genetic characteristics), genetic information, marital status, sex (which includes pregnancy, childbirth and medical conditions related to pregnancy or childbirth), gender, gender identity, gender expression, age or sexual orientation of such persons except as provided in Government Code §12940, and every contractor for public works violating Labor Code §1735 is subject to all penalties imposed for a violation of Chapter 1, of Part 7, of Division 2 of the California Labor Code. 1-64 APPRENTICES
The Contractor shall comply with all applicable provisions of Labor Code §1777.5 relating to employment of apprentices on public works.
Attention is directed to the provisions of Labor Code §§1777.5 and 1777.6 concerning the employment apprentices by the Contractor or any subcontractor under him. The Contractor and any subcontractor under him shall comply with the requirements of said sections in the employment of apprentices.
Information relative to Apprenticeship Standards Wage Schedules and other requirements may be obtained from the Director of Industrial Relations, Ex Officio the Administrator of Apprenticeship - San Francisco, California or from the Division of Apprenticeship Standards and its branch offices. 1-65 PRECONSTRUCTION CONFERENCE
Before the start of construction, the Director of Public Works will arrange to meet with the Contractor to discuss the requirements on such matters as project supervision, on-site inspections, progress, schedules and reports, payment(s) to Contractor(s), safety and other items pertinent to the project. At this conference, all parties should be prepared to discuss any anticipated problems.
1-66 SUBCONTRACTING LISTING
(a) Any person making a bid or offer to perform the work described in this Contract shall in his bid or offer set forth:
1. The name and location of the place of business of each subcontractor who will perform work of labor or render service to the Contractor in or about the construction of the work or improvement or a subcontractor licensed by the State of California, who, under the subcontract to the Contractor, especially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of one percent (.005%) of the Contractor’s total bid.
2. The portion of the work which will be done by each such subcontractor under this Contract. The Contractor shall list only one subcontractor for each such portion as is defined by the Contractor in his bid.
3. The subcontractor DIR registration number
(b) No contractor whose bid is accepted shall, without the consent of the City, either:
1. Substitute any person as subcontractor in place of the subcontractor designated in the original bid.
2. Permit any subcontractor to be assigned or transferred or allow it to be performed by any other than
17.b
Packet Pg. 314 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
30 the original subcontractor listed in the bid.
3. Sublet or subcontract any portion of the work in excess of one-half of one percent (.005%) of the Contractor's bid as to which his original bid did not designate a subcontractor. (c) Subletting or subcontracting any portion of the work as to which no subcontractor was designated in the original bid shall be permitted only in case of public emergency or necessity, and then only after a finding reduced to writing as public record of the awarding authority setting forth the facts constituting such emergency or necessity.
1-67 PROHIBITING WORK BY CERTAIN CONTRACTORS
Pursuant to the provisions in Labor Code §§1777.1 and 1777.7, the Labor Commissioner publishes and distributes a list of contractors ineligible to perform work as a subcontractor on a public works project. This list of debarred contractors is available from the Department of Industrial Relations web site at:
http://www.dir.ca.gov/DLSE/Debar.html.
1-68 CERTAIN CLAIMS – SUBJECT TO THE PROVISIONS OF PUBLIC CONTRACT CODE SECTION 9204, ATTACHED AND INCORPORATED
END OF GENERAL CONDITIONS
17.b
Packet Pg. 315 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
31 SPECIFICATIONS
1.01 STANDARD SPECIFICATIONS Unless indicated otherwise, the work embraced herein shall be done in accordance with the appropriate provisions of construction details as shown in the specifications entitled “GREEN BOOK Standard Specifications for Public Works Construction,” the latest edition, insofar as the same may apply, which specifications are hereinafter referred to as the Standard Specifications and in accordance with the following provisions:
In case of conflict between the Standard Specifications and these General Conditions and Specifications, the General Conditions and Specifications shall take precedence over and be used in lieu of such conflicting portions.
1.02 SCOPE OF WORK:
This project involves construction of a new roadway from the I-8 interchange to Wake Avenue and the westerly extension of Wake Avenue. Project will include grading of native soil, installation of Class II Base, installation of A.C. Pavement, Crack Sealing activities, Type II Slurry installation, installation of a storm drain swale and pipe, installation of PCC Sidewalk and Curb Ramps, and traffic striping.
END OF SPECIFICATIONS
17.b
Packet Pg. 316 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
32 SPECIAL PROVISIONS
1.00 ORDER OF WORK
Prior to commencement of any work on the project, a preconstruction conference will be held at the City Engineer's Office for the purpose of review and discussion of progress schedules and construction procedures. At the discretion of the Engineer, periodic meetings involving project personnel (the Contractor, utility and others) will be held for the purpose of coordinating project activities.
The first order of work shall be to install the project signs and construction information signs ten (10) working days prior to the start of work.
1.02 STARTING AND COMPLETION OF WORK - The Contractor shall begin work within ten (10) working days after receiving the "Notice to Proceed" from the City Engineer, and shall diligently prosecute the work to completion before the expiration of two hundred (200) working days from the “date of beginning” as stated in the Notice to Proceed.
1.03 FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES - (See General Conditions 1-22).
It is agreed by the parties of the contract that in case of all work called for under the contract is not completed before or upon the expiration of the time limits set forth in these Special Provisions, damage will be sustained by the City and that it will be impracticable to determine the actual damage by which the City will sustain in the event of and by reason of such delay and it is therefore agreed that the Contractor will pay to the City the sum of one thousand dollars ($1,000) per day for each and every day's delay beyond the time prescribed to complete the work.
2.00 TRAFFIC CONTROL REQUIREMENTS
The Contractor shall provide a Traffic Control Plan to the City for approval no later than fourteen (14) days prior to the scheduled commencement of work.
Comments and corrections shall be returned to the Contractor within five (5) working days. The Traffic Control Plan shall be submitted on 610 mm x 914 mm (24” x 36”) blueprints, or minimum 11” x 17”, and conform to the following requirements listed in this section.
The Traffic Control Plans as approved by the City shall be the minimum requirements for traffic control. The Traffic Control Plans do not preclude the Contractor from providing additional traffic control.
If the Contractor elects to modify the Traffic Control Plans, the Contractor shall submit the revised Traffic Control Plans that are consistent with latest edition of the California MUTCD, signed and stamped by a California Registered Professional Traffic or Civil Engineer, to the City for approval no later than fourteen (14) calendar days prior to the scheduled commencement of work. Comments and corrections will be returned to the Contractor within ten (10) working days.
The revised Traffic Control Plan shall indicate the traffic handling and control requirements for the different types of work to be performed, including advance construction signs. The Contractor shall be responsible for the preparation of Plans as necessary for specific items of work.
The revised Traffic Control Plans shall indicate the traffic control requirements for the different types of work to be performed. The Contractor shall be responsible for the preparation of the revised Traffic Control Plans, as necessary, for specific items of work. The revised Traffic Control Plans shall be approved by the Engineer.
2.01 POSTING REQUIREMENT
17.b
Packet Pg. 317 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
33 The Contractor shall post and remove temporary “No Parking” signs along all routes. Signs shall be in place for at least seventy-two (72) hours in advance of commencing work. Maximum space between signs shall be one hundred (100) feet.
3.00 CONSTRUCTION AREA SIGNS
The Contractor shall furnish, install, maintain, and remove all construction area signs in conformance with the plans and Sections 12-3.06 of the State of California Department of Transportation (Caltrans) Standard Specifications, latest edition.
4.00 DUST CONTROL
Dust control shall be performed in accordance with Subsection 7-8.1, "Clean up and Dust Control," of the Standard Specifications, Imperial County Air Pollution Control District Rules 800, 801, 802, 803, the general Provisions and the following Provision.
Dust resulting from the Contractor’s performance of the work, either inside or outside, the right-of-way shall be controlled by the Contractor. Dust control includes the action necessary to prevent, reduce or control dust within the work area as required to complete the work. The Contractor shall carry out proper and efficient measures to prevent his operations from producing dust in amounts damaging to property or causing a nuisance, or harm to persons living nearby or occupying buildings in the vicinity of the work. The Contractor shall control dust twentyfour (24) hours a day, seven (7) days a week. The methods to be used for controlling dust in the construction area and along haul roads shall be approved by the Engineer prior to starting any work.
Dust or dirt accumulations generated by the Contractor’s operations shall be cleaned and removed by the Contractor from all areas as designated by the Engineer. The cost for cleaning and removal of dust or dirt shall be at the Contractor’s expense and no additional compensation will be made therefore.
Water for use in dust control shall, at the option of the Contractor, be potable or non-potable. Non-potable water shall consist of reclaimed waste water or non-potable water developed from other sources.
If the Contractor uses reclaimed waste water in the work, the sources and discharge of reclaimed waste water shall meet the California Department of Health Services Water Reclamation Criteria and the Regional Water Quality Control Board requirements. The Contractor shall obtain either a waste water discharge permit or a waiver from the Regional Water Quality Control Board. Copies of permits or waivers from the Regional Water Quality Control Board shall be delivered to the engineer before using reclaimed waste water in the work.
Water shall be applied in the amounts, at the locations, and for the purposes designated in the Special Provision and these Specifications, and as order by the Engineer.
Water for compacting embankment material, sub-base, base and surfacing material, and for laying dust, shall be applied by means of pressure-type distributors or pipe lines equipped with a spray system or hoses with nozzles that will ensure a uniform application of water.
All equipment used for the application of water shall be equipped with a positive means of shut-off.
Unless otherwise permitted by the Engineer or unless all the water is applied by means of pipe lines, at least one mobile unit with a minimum capacity of 3700 L (1,000 gallons) shall be available for applying water on the project at all times.
Chemical additives or binder may be used in water for compaction or dust palliative. If such additives are used, furnishing and applying the additives shall be at the Contractor’s expense.
The right is reserved by the Engineer to prohibit the use of a particular type of additive, to designate the locations where a particular type of additive may not be used, or to limit the amount of a particular type of additive to be used
17.b
Packet Pg. 318 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
34 at certain locations, all if the Engineer has reasonable ground for believing that such use will in any way be detrimental.
The additive or binder shall be either miscible in water or be some form of material that is directly applied to the surface without mixing with water.
Additives or binders that are miscible in water shall be either a resin emulsion, an SS1 type asphaltic emulsion, materials composed essentially of lignin sulfonate, or any other binder that is miscible in water in the proportions provided herein is non-corrosive, and is effective as a dust palliative.
Resin emulsion shall be composed of from 57 percent (57%) to 63 percent (63%) of semi-liquid petroleum resin and the remainder water to which a suitable emulsifying agent has been added. The resin emulsion shall be readily miscible with water and when diluted with any hard water in the proportions of one part of emulsion to ten parts water shall show no signs of breakdown or separation of the petroleum resin base. Resin emulsion, which has been stored in closed containers at temperatures above freezing for a period up to three (3) months, shall show no signs of separation. Any resin emulsion which has been stored for more than three (3) months shall not be used until tested and approved.
SS1 type asphaltic emulsion shall conform to the provisions in Subsection 203-3, “Emulsified Asphalt.” Additives or binders that are miscible in water shall be mixed with additional water at the rate of from four to nineteen parts of water to one part of binder, the exact rate to be determined by the Engineer. Mixing shall be accomplished by placing the binder and water in the spreading equipment simultaneously or by some other mixing method that will produce equivalent results.
The resulting mixture shall be applied with pressure type water distributor trucks equipped with a spray system or pressure type asphalt distributors at an approximate rate of from 0.9- to 3.6 L/m2. (O.2 to 0.8 gallon on per square yard)
Additives or binders that are directly applied to the surface without mixing with water shall be applied with equipment approved by the Engineer. The binder shall be applied at a rate of from 0.4- to 1.1L/m2. (0.10 to 0.25 gallons per square yard)
The exact rate and number of applications of binders will be determined by the Engineer.
Dust control ordered by the Engineer to be applied on Saturdays, Sundays or holidays will be included in the Contract price for dust control and no additional compensation will be allowed therefore.
No adjustment of compensation will be made for any increase or decrease in the quantity of dust control required, regardless of the reason for such increase or decrease.
The full compensation for all direct and indirect costs incurred for work performed or materials used to control dust resulting from the Contractor’s performance of the work and caused by public traffic, either inside or outside the right-of-way shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefore.
5.00 NOT USED
6.00 COOPERATION AND COLLATERAL WORK
Cooperation shall be in accordance with Subsection 5-6, “Cooperation,” and Subsection 7-7, “Cooperation and Collateral Work,” of the Standard Specifications and these Special Provisions.
The Contractor shall be responsible for ascertaining the nature and extent of any simultaneous, collateral, and
17.b
Packet Pg. 319 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
35 essential work by others and coordinating with the work by others. The City, other contractors and utilities shall have the right to operate within or adjacent to the work site during the performance of such work.
Should construction be under way by other forces or by other contractors within or adjacent to the limits of the work specified or should work of any other nature be under way by other forces within or adjacent to those limits, the Contractor shall cooperate with all the other contractors or other forces to the end that any delay or hindrance to their work will be avoided. The right is reserved to perform other or additional work at or near the site (including material sources) at any time, by the use of other forces.
The Contractor and each subcontractor shall be responsible to the other for all damage to work, to persons or property caused to the other by their operations, and for loss caused the other due to unnecessary delays or failure to finish the work within the time specified for completion.
The Contractor shall include in its bid all costs involved as a result of coordinating its work with others. The Contractor will not be entitled to additional compensation from the City for damages resulting from such simultaneous, collateral, and essential work. If necessary to avoid or minimize such damage or delay, the Contractor shall re-deploy its work force to other parts of the work.
It is anticipated that some or all of the existing utilities will be relocated during construction. The Contractor is to coordinate its work with the utility companies and with any other utility relocating their facilities, at no separate or additional cost.
Should the Contractor be delayed by the City, and such delay could not have been reasonably foreseen or prevented by the Contractor, the Engineer will determine the extent of the delay, the effect on the project, and any extension of time. Should any agency or utility company’s work result in delays to the Contractor’s work schedule, the Contractor shall be entitled only to an equivalent extension of time for the completion of the contract, and shall not be entitled to damages due to downtime and idled equipment or additional payments over and above the agreed upon unit prices.
Compensation for compliance with all collateral work shall be considered as being included in the various Contract items in the bid schedule and no additional compensation will be allowed therefore.
7.00 TRAFFIC CONTROL
Traffic controls, including but not limited to, vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access, detours, and street closures shall be in accordance with the Special Provisions; Traffic Control Plans; Manual on Uniform Traffic Control Devices (MUTCD) for Streets and Highways, 2014 Edition, California Supplemental Part 6 Temporary Traffic Control; Subsection 7-10, of the current “Standard Specifications for Public Works Construction,” including all its subsequent amendments. Nothing in the Special Provisions shall be construed as relieving the Contractor from his or her responsibility to provide for the safety and convenience of traffic and the public during construction.
In the event of conflict, the order of precedence shall be as follows:
1. Special Provisions
2. Traffic Control Plans
3. MUTCD 2014, California Supplement Part 6, Temporary Traffic Control
4. MUTCD for Streets and Highways, 2012 Edition, Part 6 Temporary Traffic Control
5. Standard Specifications
Traffic Control shall be in accordance with the following Special Provisions:
1. All streets shall remain open to through traffic at all times except when street closure is approved by the Engineer. The Contractor shall make provisions to allow local traffic access to the closed streets. The local traffic consists of, but is not limited to, residences, church congregations, farmers, post offices, meter readers, trash pickup, school buses, and emergency vehicles. The Contractor shall provide a smooth travel way and either a flagger and/or signing to direct traffic.
17.b
Packet Pg. 320 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
36 2. The Contractor shall be responsible for the preparation of Traffic Control Plans as necessary for the work.
The Traffic Control Plans shall be signed and stamped by a California Registered Traffic Engineer and transmitted to the City for approval no later than fourteen (14) calendar days prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days. The Traffic Control Plans shall conform to the requirements listed in these Technical Provisions; MUTCD 2014, California Supplement Part 6, Temporary Traffic Control; Manual on Uniform Traffic Control Devices for Streets and Highways, 2014 Edition, Part 6 Temporary Traffic Control; and the Standard Specifications.
3. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices (telescoping flag trees), flags, signs, markers, portable barriers, temporary railing (Type-K), temporary fencing, flashing arrow signs, changeable message sign, markings, and flagging equipment shall be provided and maintained in “like new” condition.
4. The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, which includes holidays, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of Notice to Proceed to the completion and acceptance of the work.
5. High-level warning devices (telescoping flag trees) are required at all times for work being performed within the roadway unless otherwise specifically approved by the Engineer.
6. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than 711mm (28“) in height, except that shorter cones, 305 mm (12“) minimum height, may be permitted during striping maintenance operations where the only function of the cone is to protect the wet paint from the traffic.
The entire area of orange and white stripes for barricades shall be Type I, engineering grade, or Type II, super engineering grade, retro-reflective sheeting conforming to the requirements of ASTM Designation:
D 4956-95.
7. Type III barricades, no less than 1.83 m (6’) in length and equipped with two (2) Type “N” markers each and two (2) portable flashing beacons each, shall be used to close streets, except as otherwise specifically approved by the Engineer for minor maintenance work of no more than one (1) working days duration, on weekdays, or on holidays only, and limited to the hours between 8:30 a.m. and 3:30 p.m. Said barricades shall be placed across the full roadway at each point of closure with the distance between barricades, or between barricades and curbs, not exceeding 914 mm (3’) except that one (1) 3.3 m (11’) wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street’s center, facing the inbound vehicular traffic, shall also be equipped with one (1) Type C2 “Road Closed” sign, one (1) Type C3A, “Road Closed to Thru Traffic,” sign, and a Type P warning sign.
8. Channelizers shall be surface mounted type and shall be furnished, placed and maintained at the locations shown on the Plans or as approved by the Engineer, and shall conform to the provisions in Subsection 12-
3.07, “Channelizers,” of the State of California Standard Specifications and these Special Provisions.
When no longer required for the work as determined by the Engineer, channelizers (except channelizers to be left in place), and underlying adhesive used to cement the channelizers bases to the pavement, shall be removed. Removed channelizers and adhesive shall become the property of the Contractor and shall be removed from the site of work.
9. Reflectorized (both sides) temporary self-adhesive markers, 100mm (4in) wide, shall be applied to
17.b
Packet Pg. 321 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
37 unstriped pavement surface before opening the travel way to public traffic. Reflectorized temporary yellow markers shall be used for to delineate the centerline to separate opposing traffic. Reflectorized temporary white markers shall be used to delineate lanes of travel and placed in 600mm (24in) intervals transverse to the road to delineate stop bars and limit lines.
The reflectorized temporary markers shall be removed the same day the first coat of striping has been placed on the pavement. The removal of the markers shall be done such a way that the pavement is not damaged.
10. Except as otherwise approved by the Engineer, two-way vehicular traffic shall be maintained at all times within two (2) 3.3m (11’) wide lanes on streets having an effective roadway width of 13.4 m (44’) or more with restricted parking. Other streets of lesser widths may be reduced to one (1) 3.6 (12’) wide lane with work activity being limited to one side at a time, and the one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers. All lane closures shall have flashing arrow signs to provide additional, high level, advanced warning.
No reduction of the traveled way width shall be permitted on any City street before 8:30 a.m. or after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless otherwise approved by the Engineer.
11. Properly-trained and experienced flaggers shall be provided to direct traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at other such times as is necessary to safely pass traffic through or around the work area and when so directed by the Engineer.
12. Vehicular access to occupied residential property may be restricted on weekdays, other than holidays, between the hours of 8:30 a.m. and 3:30 p.m. while essential work activity is taking place only upon approval by the Engineer and providing the Contractor gives the property owner or resident at least fortyeight (48) hour advance written and oral notice.
Convenient and safe pedestrian access to schools, churches, occupied residential and business property shall be maintained at all times. Access to mailboxes shall be maintained at all times such that the postal delivery service is not interrupted. Trash pick-up services shall not be interrupted. Access to vacant and unused property may be restricted when approved by the Engineer. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the Engineer.
13. Vehicular access to business, school and church driveways shall be maintained at all times during construction.
14. Traffic control and safety devices and equipment being used that becomes damaged, destroyed, faded, graffitied, encrusted, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired, refurbished, or replaced. Traffic control and safety devices and equipment being used, that is displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.
15. An unobstructed view of all signs and warning devices including, but not limited to, stop signs, stop ahead signs, street name signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. All speed limit signs shall be black on white with signs at either end of the project notifying the motoring public that fines are doubled in construction zones. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers and devices from the view of the vehicular and pedestrian traffic to which it applies.
16. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly-trained and experienced flaggers, or at traffic signalized intersections.
17.b
Packet Pg. 322 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
38 17. Stockpiling or storage of materials on any public right-of-way or parking area will not be allowed without the specific written permission of the Engineer. Materials spilled along or on said right-of-way or parking area shall be removed completely and promptly. All stockpile and storage areas shall be maintained in a safe, neat, clean, and orderly condition, and shall be restored to equal or better than original condition upon completion of the work.
18. On projects involving work on, closure of, or partial closure of existing streets, and where vehicular access to the abutting property must be restricted, the work shall be so selected, arranged and scheduled that the person(s) requiring access to said abutting property and residents along said streets affected will be able to park within a reasonable distance of not more than 150m (500’) from their homes or destination. In addition, no two adjoining streets shall be closed at the same time, except as otherwise approved by the Engineer. Residents must be given written notice of such restrictions a minimum of forty-eight (48) hours in advance.
19. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, “NO PARKING” signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street, except as otherwise approved by the Engineer.
20. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to herein above, the City reserves the right to correct or mitigate any situation, that in the sole opinion of the Engineer, constitutes a serious deficiency or serious case of noncompliance, by any means at its disposal at the Contractor’s or permittee’s expense, and shall deduct the cost therefore from the Contractor’s progress or final payments. Such corrective action taken by the City shall not reduce or abrogate the Contractor’s legal obligations and liability for proper traffic control and safety measures and shall not serve to transfer said obligations and liabilities from the Contractor to the City or the City’s agents.
21. Violations of any of the above Provisions or provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the Engineer, shall, at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor or permittee, or liability to the City, all as prescribed by contractual obligation or State law, whichever is applicable.
The Contract lump sum (LS) price paid for the bid item TRAFFIC CONTROL PLAN IMPLEMENTATION shall include full compensation for, but not limited to, furnishing all labor (including flagging costs), materials (including construction area signs), tools, equipment, traffic control Plans and revisions, and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control including lights, channelizers (surface mounted), temporary railing (Type K) markers, delineators, temporary striping and pavement marking, barricades, portable flashing beacons, flashing arrow signs, portable changeable message signs, as shown on the Plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.
Full compensation for removing and salvaging the traffic control equipment and materials that are to be reused or reset in the project shall be considered as included in the Contract lump sum price paid for traffic control system and no additional compensation will be allowed therefore.
Partial payment for traffic control shall be based on the percentage of total value of work completed on the other items listed under each schedule as of each progress pay estimate.
8.00 EXISTING IMPROVEMENTS
The Contractor shall make every effort to protect all existing improvements and facilities from damage during the progress of his work. No trees, planters, walks, shrubs, signs, fences or other such facilities shall be removed except as shown or called for on the plans or unless specifically authorized in writing by the Engineer. The contractor shall be held responsible for the care and preservation of the present premises and of adjacent premises and coterminous
17.b
Packet Pg. 323 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
39 property. Any parts of them which are injured, damaged or disturbed because of his work shall be repaired, replaced or cleaned by him at his expense.
The Contractor shall apply either water and/or dust palliative for the alleviation or prevention of dust nuisance and damage originating from the Contractor's operation.
8.01 EXISTING UTILITIES
The Contractor will be required to work around public utilities and other improvements that are to remain in place within the construction area. The Contractor will be held liable for any damage to existing improvements or interference with service resulting from his operations. The exact location of underground facilities and improvements within the construction area shall be ascertained by the Contractor before using equipment that may damage such facilities.
9.00 MAINTENANCE CALL-OUTS
Any expense for maintenance call-outs by the City’s traffic signal maintenance personnel resulting from the Contractor’s operations and construction of this project shall be borne by the Contractor.
10.00 WARRANTIES, GUARANTEES AND INSTRUCTION SHEETS
Warranties, guarantees and instruction sheets shall conform to the provisions in Section 86-1.04, “Warranties, Guarantees and Instruction Sheets” of the State Standard Specifications and these Special Provisions.
Completed work shall be guaranteed to the City by the Contractor for a period of not less than twelve (12) months following the date of acceptance thereof. Where equipment and/or facilities installed by the Contractor are damaged prior to final acceptance by the City, the Contractor shall repair or replace such equipment and/or facilities at his own expense.
11.00 STORAGE OF MATERIAL
The site of work shall be maintained clean at all times. Excavated material shall be loaded directly and hauled away from job site for disposal at the Contractor’s expense. The Contractor shall not store material on job site. He shall store material at a site convenient to the job, off public ways, arranged and paid as a part of his contract work.
12.00 CLEANUP OF SITE
During the progress of the work, the Contractor shall keep the premises occupied by him in a neat, orderly and sanitary condition. He shall dispose of refuse as often as directed, or as may be necessary so that at no time shall there be any accumulation of rubbish, excavated material or equipment that will interfere with convenience or operation of materials so as to provide the minimum obstruction to traffic at all times.
13.00 SANITARY ARRANGEMENTS
The Contractor shall make provisions for and maintain, in a sanitary manner at the worksite, all necessary and sanitary conveniences for the workers, in accordance with the rules and regulations of the State Board of Health.
14.00 ACCESS
The Contractor’s attention is directed to the existing pedestrian and vehicular access ways crossing the lines of work. These access ways shall not be closed unless an alternate access way is provided. The Contractor shall assume full responsibility for providing alternate access. The compensation for the work in this time shall be considered as included in the cost of the various contract items of work and no additional compensation will be made therefore.
END OF SPECIAL PROVISIONS
17.b
Packet Pg. 324 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
40 SPECIAL CONDITIONS
TABLE OF CONTENTS
1. SUBMITTALS……………………………………………………………………………….41
2 STREET GEOTECHNICAL TESTING REQUIREMENTS…………………………..........42 3 AS-BUILTS DRAWINGS…………………………………………………………………...43
4 BUSINESS LICENSE……………………………………………………………………......43
5 CONSTRUCTION WATER………………………………………………………………….43
6 STAGING AREA…………………………………………………………………………….43
7 IMPORTED NATIVE MATERIAL…………………………………………………………43
8 MATERIAL DELIVERY TICKETS……………………………………………...................43 9 MANHOLE AND WATER VALVE FRAMES AND COVERS……...................................44 10 RESTROOMS………………………………………………………………………………..44
11 PROJECT MEETINGS……………………………………………………………………...44
12 RESTORATION OF EXISTING FACILITIES......................................................................44 13 CONSTRUCTION STAKING………………………………………………………………44
14 PRESERVATION/PERPETUATION OF SURVEY MONUMENTS…………...................46 15 AIR POLLUTION CONTROL DISTRICT REQUIREMENTS…………………………….49 16 IMPERIAL IRRIGATION DISTRICT REQUIREMENTS…………………………………65 17 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION…65 18 TRAFFIC SIGNALIZATION MODIFICATION…………………………………………...65 19 COORDINATION BETWEEN PHASE I AND PHASE II CONTRACTORS…………….65 20 CALTRANS ENCROACHMENT PERMIT………………………………………………..67
21 CERTIFICATE OF COMPLIANCE VERIFICATION…………………………………….68 22 CATEGORICAL EXEMPTION/CATEGORICAL EXCLUSION
DETERMINATION FORM CONDITIONS…………………………………….................68 23 BUY AMERICA REQUIREMENTS REVISIONS………………………………………..75 24 PROJECT SIGNS…………………………………………………………………………..79
17.b
Packet Pg. 325 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
41 SPECIAL CONDITIONS
1. SUBMITTALS
The Contractor shall submit the following shop drawings or submittal information to the Construction Manager for review and approval prior to commencing construction work at the project site. A total of six (6) sets of submittal documents shall be forwarded to the Construction Manager. Three (3) reviewed submittal documents shall be forwarded to the Contractor. This list is not intended to be all-inclusive and the Construction Manager reserves the right to demand shop drawings and submittal information associated with any other items at its discretion. Items to be installed/constructed within Caltrans Right-of-Way shall be per the current Caltrans Standard Specifications and Plans and require approvals from the Caltrans Resident Engineer.
1. A.C. mix design. The percent bitumen, sieve analysis, durability, resistance (R-value), aggregate gradation, and all other standard parameters. The A.C. mix design shall meet the current Caltrans Standard Specifications and the requirements of the Caltrans Resident Engineer for the project.
2. Native material backfill gradation, durability, R-value, and sand equivalent for the bridge ramp construction, in accordance with the current Caltrans Standard Specifications and the requirements of the Caltrans Resident Engineer for the project.
3. Class 2 Base gradation, durability, R-value, and sand equivalent
4. Tack Coat
5. Polymer Modified Asphalt Rubber Crack Sealant
6. Type II Slurry Sealcoat
7. 2” x 8” pressure treated header board
8. Sand backfill gradation and sand equivalent
9. P.C.C. concrete mix design
10. Reinforcing bars
11. Truncated domes for the ADA compliant ramps
12. New signs and signage posts. The signs and the signage posts to be installed within Caltrans Rightof-Way shall be approved by Caltrans.
13. Traffic paint and striping. The traffic paint and striping to be installed within Caltrans Right-ofWay shall be approved by Caltrans.
14. Traffic Control Signs, barricades, cones, and devices including all items illustrated on the Traffic Control Plans. The traffic control devices to be installed within Caltrans Right-of-Way shall be approved by Caltrans.
15. Traffic Control Plan(s) for the signage and striping to be installed/adjusted/replaced within Caltrans Right-of-Way shall be prepared and approved by Caltrans.
16. Manhole concrete grade rings
17. Ductile iron mechanical joint end cap
18. Ductile iron bury, shear spool, and hardware for the adjustment of the fire hydrant
19. Erosion Control BMP items
20. Conduits for Traffic Signalization for Phase II
21. Project Identity and Construction Signs
22. Copy of Double Permit Issued by Caltrans
23. Certificates of Compliance including Buy America Provisions
24. Caltrans LAPM Forms and Documents Required by Funding Sources
25. Construction Schedule
26. The letter designating the project superintendent
27. Schedule of Values
THE CONTRACTOR SHALL NOT INITIATE CONSTRUCTION UNTIL SUBMITTAL FOR ANY MATERIAL USE IS APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL OBTAIN APPROVALS ON SUBMITTALS OF ITEMS
TO BE INSTALLED WITHIN CALTRANS RIGHT-OF-WAY FROM THE CALTRANS RESIDENT ENGINEER FOR THIS PROJECT.
17.b
Packet Pg. 326 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
42 2. STREET GEOTECHNICAL TESTING REQUIREMENTS
All geotechnical testing and inspections required for this project shall be completed by the Caltrans certified geotechnical engineers and laboratory(ies). All geotechnical testing shall be completed by two (2) independent geotechnical engineering firms. One geotechnical firm shall provide Acceptance Testing (AT) for Quality Control (QC) and the other shall provide Independent Assurance Program (IAP) services for Quality Assurance (QA) in accordance with the City of El Centro Quality Assurance Program (QAP).
The Contractor shall provide Acceptance Testing (AT) services for Quality Control and the City of El Centro shall provide Independent Assurance Program (IAP) services for Quality Assurance. Geotechnical inspection and testing within Caltrans Right-of-Way or for the adjoining area affecting the structural pavement section within Caltrans Right-of-Way shall be completed in accordance with the Caltrans Standard Specifications.
A. A compaction test for the Class 2 Base shall be required for every 200 lineal feet of P.C.C. barrier curb or P.C.C. curb and gutter.
B. A compaction test for the Class 2 Base subgrade material shall be required for every 2,000 square feet of Class 2 Base surface area for each lift.
C. A compaction test for the Class 2 Base or granular sand fill shall be required for every 100 lineal feet of pipeline installed.
D. A compaction test for the Class 2 Base installed beneath P.C.C. infrastructure such as driveway, ADA compliant ramp, catch basin, etc. shall be required for each P.C.C. infrastructure.
E. A compaction test for the Granular Sand installed beneath P.C.C. sidewalk shall be required for every 200 lineal feet of P.C.C. sidewalk.
F. A compaction test for the imported native material to be installed at the bridge embankment shall be required for every 2,000 square feet for each lift/layer of native material installation.
G. A compaction test for the native material graded within native swale shall be required for every 2,000 square feet of native material surface area.
H. An extraction/gradation test shall be completed from an A.C. pavement sample obtained by the geotechnical consultant representative each morning pavement operations occur.
I. A compaction test for the A.C. pavement shall be required for every 2,000 square feet of A.C. pavement surface area.
J. A.C. pavement density testing shall be conducted on a continuous basis by the geotechnical representative during the placement of A.C. pavement.
K. One (1) set of cylinders and one (1) slump test shall be required for every 50 cubic yards of concrete except that a minimum of one (1) set of cylinders and slump test shall be required each day twenty (20) or more yards of concrete are placed at a project site. The maximum allowable slump shall be 4 inches. A set of cylinders shall be composed of three (3) cylinders. The first cylinder of a set shall be tested after seven (7) days curing. The second cylinder of a set shall be tested after 28 days curing. The third cylinder shall be held in reserve and tested if directed by the Construction Manager. The test results will be forwarded to the Construction Manager for review. The Construction Manager shall receive a concrete vendor slip for each truck load of concrete delivered to the project site.
L. An A.C. mix design and concrete mix design shall be submitted for the review and approval of the Construction Manager during the submittal process.
17.b
Packet Pg. 327 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
43 M. Geotechnical testing is required for the granular sand during the submittal process per the Technical Conditions contained within this document.
N. Geotechnical testing is required for the Class 2 Base during the submittal process per the Technical Conditions contained within this document.
O. Geotechnical testing is required for the Native/Imported/Borrowed Material during the submittal process for the bridge tie-in construction per the Caltrans Standard Specifications and the Caltrans Resident Engineer.
3. AS-BUILT DRAWINGS
The Contractor shall maintain a set of drawings at the site showing all “as-built” changes made to date. A marked-up set of drawings shall be delivered to the Construction Manager upon completion of the work which shall reflect all “as-built” modifications.
4. BUSINESS LICENSE
The Contractor and Subcontractors performing work on this project shall obtain a business license from the City of El Centro. The Contractor and Subcontractors shall contact the City regarding the cost of the license and include the cost in the proposal.
5. CONSTRUCTION WATER
Construction water required during the project shall be available from the nearest City of El Centro fire hydrant. The Contractor shall secure a permit with the City of El Centro to obtain a construction water meter. The City of El Centro Standard Rate applies for the water usage.
6. STAGING AREA
The City of El Centro shall provide a staging area to the Contractor within the Water Treatment Plant.
7. IMPORTED NATIVE MATERIAL
Native material is available at the City of El Centro Water Treatment Plant (WTP) to the Contractor. It is not guaranteed if the material from the WTP meets the project specifications. The Contractor may complete geotechnical testing to confirm the R-value and the optimum moisture content of the material if the native material can achieve the specified compaction requirements prior to bidding. The quantity of native material available at the WTP is unknown. The Contractor shall supply additional native backfill/fill material from another source, if necessary.
Imported or borrowed native material fill bordering or encroaching Caltrans Right-of-Way must meet Section 19 of the latest Caltrans Standard Specifications. The submittal documents of the imported native material fill encroaching the Caltrans Interchange Bridge must be submitted to Caltrans for approval prior to the commencement of construction activities.
8. MATERIAL DELIVERY TICKETS
The Contractor shall provide material delivery tickets to the Construction Manager for Class 2 Base, P.C.C. concrete, asphalt concrete, granular sand, and similar items delivered to the project site. The material tickets shall be provided to the Construction Manager immediately upon the material item arriving at the project site.
17.b
Packet Pg. 328 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
44 9. MANHOLE AND WATER VALVE FRAMES AND COVERS
All manhole frames and covers, water valve boxes and lids, gas valve boxes and lids, and other similar existing utilities shall be raised to the grade of the finished pavement surface or finished grade by the Contractor. Manhole frames and covers, water valve lids and similar utility covers shall be lowered to a minimum of 3 inches below the design pavement surface prior to the installation of A.C. pavement. Manhole frames and covers and water valve lids shall be raised after paving operations have occurred. 8 inch wide, 8-inch deep concrete collars shall be poured concentric with the outside of water and gas valve extension risers 3/8 inches below the finish pavement surface. A one foot (1’) wide, one foot (1’) deep concrete collar shall be poured concentric with the outside of all manhole frames and covers 3/8 inches below the finish pavement surface. The manhole frame and covers and water and gas valve extension risers and covers shall be raised 3/8 inches below the pavement grade after paving operations are complete.
10. RESTROOMS
The Contractor shall place separate Men’s and Women’s portable restrooms at the project site during the project duration. The restrooms shall be cleaned on a weekly basis. The restrooms shall be positioned near the location of the work activities.
11. PROJECT MEETINGS
Weekly Progress Meetings shall be conducted to review and discuss the construction schedule, coordination of work activities with different agencies, Request for Information Forms, Submittal Documents, safety related matters, and other project related items.
Weekly Progress Meetings shall be held at a location and regularly scheduled time agreed upon by the Construction Manager, Contractor and the City of El Centro. The Construction Manager shall prepare a weekly progress meeting agenda and prepare a weekly progress meeting memorandum.
12. RESTORATION OF EXISTING FACILITIES
Unless noted otherwise on the specifications, the Contractor shall replace all existing facilities within the project boundaries to their original conditions. Severed or damaged utilities and other existing items to remain shall be repaired by the Contractor to the satisfaction of the Construction Manager. Existing onsite underground facilities shall be replaced to their original conditions. Construction debris shall be removed from the pavement surfaces and concrete infrastructure. The Contractor shall sweep the A.C. pavement areas free of dirt and debris resulting from the construction activities at the conclusion of the project. The contractor shall remove and dispose of the dirt and debris.
13. CONSTRUCTION STAKING
The Contractor shall provide all staking and layout points for the establishment of street subbase grade and subgrade, flowline, native earth swale finish grade, native earth embankment, A.C. paving, P.C.C. infrastructures such as curb and gutter, driveway, sidewalk, storm drainage facilities, signage and striping, demolition layout work and miscellaneous items. The Contractor is responsible to engage a contract with a California-licensed Land Surveyor or Registered Civil Engineer authorized to practice land surveying to oversee the land survey work for this project. The staking and demolition layout work to be provided by the Contractor is as follows:
A. Demolition layout shall be completed by painting the demolition lines along the pavement areas for sawcutting and grinding. Demolition layout lines in native earth areas shall be established with hubs and lath placed at 25 feet on center and at all angle points along the demolition line. Cut and fill vertical distances from the hubs to the native finish design grade will be established.
17.b
Packet Pg. 329 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
45 B. Install hubs 5 foot from the toe of the bridge ramp native embankment. Provide cuts and fills to the bottom of finish design toe of slope and slope staking information. Place hubs at 25-foot on center, at angle points, E.C.’s and B.C.’s.
C. Install hubs at an offset distance determined by the Contractor from the top of the bridge ramp native embankment slope. Provide cuts and fills to the top of the finish design top of slope and slope staking information. Place hubs at 25-foot on center, at angle points, E.C.’s and B.C.’s.
D. Install offset hubs at an offset distance determined by the Contractor for the stormwater piping. Hubs shall be placed at 20 feet on center, at beginning and ending points and at pipe fittings. Cut and fill vertical distances referenced from the top of hub to the pipeline flowline shall be prepared and issued to the Contractor.
E. Offset hubs shall be placed in-line with the exterior edges of the stormwater inlet structures at an offset distance determined by the Contractor. Cut and fill vertical distances as referenced from the hubs to the top of finish inlet structure design grade shall be prepared and issued to the Contractor.
F. Offset hubs shall be established along the native earth swale. The hubs shall be placed at an offset distance determined by the Contractor. Hubs shall be established at 25 feet on center, beginning and ending points, B.C.’s and E.C.’s. Cut and fill vertical distances as referenced from the hub to the flowline elevations along the swale shall be prepared and issued to the Contractor.
G. Place offset hubs 25 feet on center along P.C.C. barrier curb or P.C.C. curb and gutter, end of curve radii, beginning of curve radii, ¼ and ½ delta angle points at curve radii and barrier curb or curb and gutter ending points at an offset established by the Contractor for the rough grading work required to establish subbase elevation grade for the P.C.C. barrier curb or curb and gutter, P.C.C. sidewalk, driveway, ramp, and A.C. paving. Cut and fill vertical distances from the hubs to the subbase design grade will be established.
H. Install bluetop stakes (stakes placed to design grade) at the A.C. pavement edges, roadway centerline, roadway quarter points (between the centerline and the edge of pavement) if the street width is wider than 40-foot, and hinge points/grade breaks across the roadway section at the subbase grade (bottom of the Class 2 Base grade). Bluetop stakes are to be placed 25 feet on center along the street section and at the beginning and ending points of the street section.
I. Install bluetop stakes (stakes placed to design grade) at the A.C. pavement edges, roadway centerline, roadway quarter points (between the centerline and the edge of pavement) if the street width is wider than 40-foot, and hinge points/grade breaks across the roadway section at the subgrade (top of the Class 2 Base grade). Blue top stakes are to be placed 25 feet on center along the street section and at the beginning and ending points of the street section.
J. Place offset stakes at an offset distance determined by the Contractor along the edge of pavement or curb and gutter flowline. The offset stakes shall be placed at 25 feet on center, hinge points/grade breaks and at the beginning and ending points of the edge of pavement or flowline. Place offset hubs at curb returns at the B.C., E.C., ¼ Delta, ½ Delta, ¾ Delta and Radius Point. Cut and fill vertical distances as referenced from the offset stakes to the top of the A.C. pavement or flowline grade shall be established.
K. Place offset stakes at an offset distance and location determined by the Contractor at the P.C.C. ramp, driveway and other P.C.C. infrastructure after rough grading work has been accomplished. Cut and fill vertical distances as referenced from the offset stakes to the top of P.C.C. infrastructure elevation shall be established.
17.b
Packet Pg. 330 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
46 The construction staking shall be completed under the supervision of a Registered Civil Engineer or Land Surveyor licensed to practice land surveying in the State of California. Cut sheets shall be provided to the Contractor, Construction Manager and pertinent subcontractors within 24 hours after the completion of staking activities. Staking shall be established according to the stationing or control points as illustrated on the design plans. Staking shall be established at even stationing; i.e., 9+00, 9+25, 9+50, 9+75 and so on. The Contractor shall carefully preserve benchmarks, reference points, stakes and layout points, and in case of willful or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistakes that may be caused by its unnecessary loss or disturbance.
14. PRESERVATION/PERPETUATION OF SURVEY MONUMENTS
The Contractor shall be responsible to complete an initial field survey research by a California licensed professional land surveyor. The engaged California licensed professional land surveyor shall complete and submit the Certificate of Monument Preservation form included at the end of this section prior to the commencement of the construction activities. The field survey research shall include researching survey monuments records, maps, and tie cards; completion of the field investigation to determine the existence/locations of the survey monuments prior to the commencement of construction activities; placement of a flagged lath adjacent to the found monument indicating the direction and the distance of the monument from the lath; preparation of field notes for each found monument illustrating relative dimensions from the surrounding existing objects and the descriptions of the monuments; reporting to the Construction Manager of the City of El Centro of the found monuments to evaluate the necessity to furnish a new survey monument for each found monument and to report the locations and the conditions of the found monuments; and all necessary field coordination with the County Surveyor’s Office, City Representative(s), Contractor and other stakeholders to preserve/perpetuate the found monuments.
The land surveyor shall determine and confirm if there are any records/maps to be prepared or establishment/reestablishment or perpetuation for the monuments found or not found is required in accordance with Section 16:
Section 8771 (b) (c) and (d) of the Business and Professions Code (Land Surveyor’s Act) unless monuments and the scope of work for the monuments (to remain, protect in place, to be perpetuated, to be furnished with a monument well, etc.) are specifically called out on the Plans.
Full compensation for completing field survey research by a California licensed professional land surveyor to determine the existence/locations of the survey monuments, verify its conditions to be protected in place or to be perpetuated, filing and signing the Certificate of Monument Preservation, and coordination with the County Surveyor’s Office, City Representative(s) and other involved stakeholders shall be considered as included in the contract lump sum price paid for the “Surveying and Construction Staking” and no additional compensation shall be provided.
Any existing survey monuments or City/County/Caltrans recognized benchmarks shall be protected by the Contractor. Should any such monuments or benchmarks be removed, damaged, obliterated, or altered by the Contractor’s operations, the Contractor shall be responsible for preservation or perpetuation by the proper resetting of the same as per the Business and Professions Code, the Professional Land Surveyors Act and to the satisfaction of the County of Imperial Surveyor’s Office. Such points shall be preserved or perpetuated with appropriate monumentation by a licensed land surveyor or a registered civil engineer authorized to practice land surveying.
All preserved or perpetuated survey monuments shall be constructed in accordance with the City of El Centro, County of Imperial, and Caltrans requirements, per the jurisdictional requirements in their respective right-ofways.
Corner Records or a Record of Survey as appropriate shall be prepared and filed by the licensed land surveyor or registered civil engineer authorized to practice land surveying at the County of Imperial Recorder’s Office.
The copies of Corner Records or Record of Surveys recorded in compliance with the Business and Professional Code shall be forwarded to the Resident Engineer.
17.b
Packet Pg. 331 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
47 The Contractor shall include all costs to replace/perpetuate the existing monument shown on the existing sidewalk/slab of Turning Point Building in the bid item for “Surveying and Construction Staking.” The Contractor shall be paid for preservation/perpetuation of other survey monuments/benchmarks and preparation of Corner Record/Record of Survey not identified on the plans as “Extra Work” for survey monument/benchmark to be preserved/perpetuated unless a bid item is included for those other survey monuments/benchmarks perpetuation.
The work associated with the preservation/perpetuation of the survey monuments/benchmarks shall include filing appropriate survey documentations/maps before and after the preservation/perpetuation of the survey monuments; jack hammering/sawcutting the new pavement surface to allow the installation of the new P.C.C. concrete ring and positioning of the monument well cover; backfilling the monument well with compacted Class 2 Base; plumbing monument well; leveling monument well frames and covers; furnishing new brass disks with punching and marking for survey monuments, if necessary; preservation/perpetuation of survey monuments; installation of new P.C.C. concrete rings circumferentially around the monument well covers; removal and disposal of construction demolition material associated with the installation of survey monument wells and all other items incidental to preserving/perpetuating survey monuments in accordance with the Business and Professions Code and to the satisfaction of the Resident Engineer and the County Surveyor’s Office.
17.b
Packet Pg. 332 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
48 17.b
Packet Pg. 333 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
49 15. AIR POLLUTION CONTROL DISTRICT REQUIREMENTS
A. The Contractor shall be required to comply with the County of Imperial Air Pollution Control District’s requirements. County of Imperial Air Pollution Control District forms, requirements and information are available via the internet at http://www.imperialcounty.net/AirPollution/Default.htm B. The Contractor shall be responsible for completing, submitting and implementing the Construction Notification Form and Dust Control Plan as required by the Imperial County Air Pollution Control District. The Construction Notification Form and Dust Control Plan template forms follow this specification section.
17.b
Packet Pg. 334 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Imperial County Air Pollution Control District
Construction Notification Form
Project Information
Project Name:
Project Address:
Major X-Streets:
City: County:
Expected Construction Start Date: Total project site area: Acres End Date: Total disturbed surface area: Acres
The project is: Residential Non-residential (commercial, industrial, institutional, pulbic, etc.) Construction activities on any site will include ten acres or more of disturbed surface area for residential developments, or five acres or more for non-resiential developments, are required to submit a Dust Control Plan to the District prior to the start of any construction activity. The Construction Notification Form may not be used to circumvent any Dust Control Plan requirement.
Contacts
Property Owner:
Address:
City / State / Zip:
Phone: Fax: Cell:
Developer:
Address:
City / State / Zip:
Contact Person:
Phone: Fax: Cell:
General Contractor:
Address:
City / State / Zip:
Contact Person:
Phone: Fax: Cell:
Other Contact:
Company:
Address:
City / State / Zip:
Phone: Fax: Cell:
Mailing Address: 150 South 9th Street
El Centro, CA 92243
Office: (442) 265-1800
Fax: (442) 265-1799
17.b
Packet Pg. 335 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
PROJECT IDENTIFICATION
Project Name
Legal Name/Company
Description of the location of the project; such as Address and major cross roads City
NAME
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
Project CUP #
PROJECT CONTACTS
In order to comply with the requirements of Regulation VIII all contacts responsible for the submittal and implementation of the Dust Control Plan shall be identified below with an explanation of the responsibility of each contact. If additional space is needed please attach a sheet. (Rule 801, subsection F.2.c.1) TITLE
PHONE NUMBER E-MAIL ADDRESS
Describe the association the named person above has to the identified project. What are that person's duties, responsibilities. Does the person named above have the primary responsibility for implementing the Dust Control Plan? Is this person responsible for the project site?
NAME TITLE
PHONE NUMBER E-MAIL ADDRESS
Describe the association the named person above has to the identified project. What are that person's duties, responsibilities. Does the person named above have the primary responsibility for implementing the Dust Control Plan? Is this person responsible for the project site? Contact name Contact Phone
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
Please identify any known contractors, names, phone contact person etc., hired to work on the project site on separate cover.
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 336 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
PROJECT CONSTRUCTION OPERATIONS
Project Name Project CUP #
Provide pertinent information concerning the projects construction operations - include a plot plan (which may be a tract map, site map or topographic map) which identifies the boundaries of the project, existing roads (including but not limited to paved, unpaved road ways, highways and freeways), where new proposed roads will be constructed, where the staging areas will be located, easements, entry and exit points (include whether these entry points will be permanent or temporary), whether or not sensitive receptors are adjacent to the project (including but not limited to residential areas, schools, day cares, churches, hospitals, nursing facilities, commercial and/or retail), include the distance between the project and the sensitive receptors and any other information as to allow for the proper evaluation of dust generating point sources and their impact. (Rule 801, subsection F.2.c.2&5)
The following checklist is provided solely as a guide and is not meant to be all inclusive. During the Plot Plan review process the Air District may identify additional dust generating point sources. For those instances where additional sources, not listed, have been identified please list under other. (Rule 801 subsection F.2.c.2&5)
List all identified actual and potential sources of fugitive dust emissions Bulk material handling and storage areas.
Paved and unpaved access roads, haul roads, traffic areas, and equipment storage yards.
Exit points where carryout and trackout onto paved public roads may occur.
Water supply locations if water application will be used for controlling visible dust emissions.
Check or list the relative locations of sensitive receptors within ¼ mile of the project. (Rule 407, Nuisance) No sensitive receptors within ¼ mile of the project.
Residential areas, schools, day care, churches, hospitals, nursing facilities, commercial, retail, etc.
Freeways, roads, or traffic areas that may be affected by the dust generating activities.
Other list below.
Other list below.
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 337 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
DISTURBED SURFACE AREA
Report the total area of land surface to be disturbed, the daily throughput volume of earthmovement in cubic yards and the total area in acres of the entire project site. (Rule 801, subsection F.2.c.3&4) Total surface area to be disturbed Acres
Daily maximum throughput volume of earthmoving
Cubic Yards
Daily average throughput volume of earthmoving
Cubic Yards
Total area of project site Acres
Total disturbed areas left inactive for more than seven days Acres
EXPECTED CONTRUCTION START AND END DATES
Phase 1 End Date
Phase 1 Start Date
Phase 2 Start Date
Phase 2 End Date
IF CONSTRUCTION IS NOT PHASED SIMPLY INCLUDE THE START AND END DATES UNDER THE PHASE 1 OPTION
Phase 3 Start Date
Phase 3 End Date
Phase 4 Start Date
Phase 4 Start Date
Identify whether any other locations should be included with this plan that are involved with this project.
An example may include listing any site where materials will be imported from or exported to.
OTHER SITES
No other locations are included with this project
Location 1:
No Dust Control Plan Required Included with this plan Included with another plan Location 2:
No Dust Control Plan Required Included with this plan Included with another plan Location 3:
No Dust Control Plan Required Included with this plan Included with another plan
DUST GENERATING ACTIVITY DATES
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 338 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
MINIMUM REQUIREMENTS
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
Structural Demolition
No demolitions are planned for this project explain below.
Asbestos NESHAP notification has been submitted to the ARB and copy to the District.
Pre-Activity (Rule 801 subsection F.1.a)
Not applicable for this project explain below.
The site will be pre-watered and work will be phased to reduce the amount of disturbed surface area at any one time. (Complete section M-1 beginning with page 7)
Active Operations (Rule 801, subsection F.1.b)
Application of water or Chemical Stabilizers to earthmoving activities. (Complete sections M-1 and/or M-2) Construct & maintain wind barriers to limit visible dust emissions to 20%. (Complete section M-3) Temporary stabilization: areas unused for seven or more days (Rule 801 subsection F.1.c) Not applicable for this project explain below.
Vehicular access will be restricted and water or dust suppressants will be applied and maintained at all unvegetated areas. (Complete sections M-2 and/or section M-3) Date notification submitted
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 339 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Unpaved Access, Haul Roads, Traffic & Equipment Storage Areas (Rule 805) Not applicable for this project explain below.
Apply water or dust suppressants to unpaved haul and access roads. (Complete sections M-1 and/or M-2) Method of restricting unauthorized vehicle access. (Complete section M-3) Water or dust suppressants will be applied to vehicle traffic and equipment storage areas. (Complete sec M-1 and/or M-2) Establish vegetation on all previously disturbed areas .(Complete section M-3)
MINIMUM REQUIREMENTS CONTINUED
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
Outdoor Handling of Bulk Materials (Rule 802)
No bulk materials will be handled during this project explain below.
Water or dust suppressants will be applied when handling bulk materials. (Complete sections M-1 and/or M-2) Protection from wind erosion by sheltering or enclosing the operation and transfer line. (Complete section M-3) Outdoor Storage of Bulk Materials (Rule 802)
No bulk materials will be stored during this project explain below.
Water or dust suppressants will be applied to storage piles. (Complete sections M-1 and/or M-2) Storage piles will be covered with tarps, plastic or other suitable material and anchored in such a manner that prevents the cover from being removed by wind action. (Complete section M-3)
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 340 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Enhanced Measures: According to Regulation VIII stabilization must be met at all times. See Rule 801 subsection D.2 Cease dust generating activities when wind speeds exceed 25mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.)
Application of water or dust suppressants once per hour when wind speeds exceed 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.) Apply water to maintain 12% soil moisture content when wind speed exceeds 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.) Construct fences 3-5 feet high with 50% or less porosity in conjunction with water application or dust suppressant when wind speeds exceed 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.)
OTHER - If necessary attach separate sheet.
On-Site/Off Site Transporting of Bulk Materials
No bulk materials will be transported on the project site explain below.
Haul trucks will be covered with a tarp or other suitable cover. (Complete section M-5) All haul trucks will be loaded such that the freeboard is not less than six inches when transported across any paved public access road. (Complete section M-5)
Cargo compartments are maintained so that no spillage and loss of bulk material will occur from holes or other openings in the floor, side and/or tailgate. (Complete section M-5) Cargo compartment is to be cleaned and/or washed at delivery site after removal of Bulk Material. (Complete section M-5)
MINIMUM REQUIREMENTS CONTINUED
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 341 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
WATER APPLICATION
Complete this section if water application will be used as a control method for limiting visible dust emissions and stabilizing surface areas. Check and answer all sections that apply to this project. In addition, if there is no intention of applying water to any phase of the project explain below. (Rule 801 section F) NO WATER APPLICATION - EXPLAIN?
WATER APPLICATION SUPPLY - THE LOCATION OF EACH MUST BE IDENTIFED ON THE PLOT PLAN Fire hydrants
Number of hydrants available On-Site Off-Site
Approval granted by the owner or public agency to use their fire hydrants for this project.
Owner or Agency granting approval
Contact Name and phone number
Storage tanks Number of tanks
Wells Number of wells
Canal, River, Pond, Lake etc.
Approval granted by the owner or public agency to use their water source for this project Other explain
Capacity of each
Flow rate of each well
Owner or Agency granting approval
Contact Name and phone number
SECTION M-1
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 342 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
WATER APPLICATION CONTINUED
Complete this section if water application will be used as a control method for limiting visible dust emissions and stabilizing surface areas. Check and answer all sections that apply to this project. In addition, if there is no intention of applying water to any phase of the project explain above. (Rule 801 section F)
WATER APPLICATION EQUIPMENT: THE LOCATION OF EACH MUST BE IDENTIFED ON THE PLOT PLAN Sprinklers
Describe the activities that will utilize sprinklers
Minimum treated area Square Feet
Acres
Maximum treated area
Water Truck Other explain
Describe the activities that will utilize the equipment Number of application equipment to be used
Application equipment capacity
Application frequency must be once per day or more explain frequency below Hours of operation
Water application equipment is available to operate after normal working hours, on weekends and holidays Name of contact after hours Phone No.
Name of contact after hours Phone No.
Frequency
Square Feet
Acres
Frequency
SECTION M-1 CONTINUED
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 343 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
DUST SUPPRESSANT PRODUCTS
Complete this section if a dust suppressant product will be used. These materials include but are not limited to: hygroscopic suppressants (road salts), adhesives, petroleum emulsions, polymer emulsions and bituminous materials (road oils).
Not Applicable - The only control method will be the application of water (Complete section M-1) Application Area; Explain where the dust suppressant will be applied below Product (Manufacturer) Name
Name of contractor Phone No.
Explain the rate of application including the amount of gallons of undiluted material per mile or per acre below.
Utilizing the checklist below attach each of the following pieces of information that fully describes the product to be used. All information must be submitted with this plan.
Product Specifications. (MSDS, Product Safety Data Sheet, etc.) Manufacturer's Usage Instructions. (method, frequency and intensity of application) Environmental impacts and approvals or certificaitons related to the appropriate and safe use for ground application.
Explain the application frequency; type and number of equipment; capacity including the amount of gallons of undiluted material per mile or per acre below.
Check here if more than one dust suppressant will be utilized and include the necessary copies of this page with the information for each dust suppressant to be used.
SECTION M-2
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 344 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
OTHER DUST CONTROL METHODS
Check below all other types of dust control methods that will be employed at the construction site.
Physical barriers for restricting unauthorized vehicle access Fences Gates Posts Berms Concrete Barriers
Other explain below
Wind barriers describe below.
Re-establish vegetation for temporarily stabilizing previously disturbed surfaces explain below.
Apply Gravel- for the application of gravel identify where application will occur such as haul road, access roads, equipment storage yards (areas), vehicle traffic areas etc explain below.
Apply pavement - explain where paving will occur.
Other explain below.
SECTION M-3
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 345 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
TREATMENTS FOR PREVENTING TRACKOUT
Select the control devices that will be used for preventing trackout from occurring onto paved public roads. Trackout is any material that adheres to vehicle tires and is deposited onto a paved public road or the paved shoulder of a paved public road. Check all that apple to this project below.
Grizzly: Rails, pipes, or grates used to dislodge debris off of vehicles before exiting the site. Extends from the intersection with the paved public road surface for the full width of the unpaved exit surface for a distance of at least 25 feet. Describe below
Gravel Pad: A layer of washed gravel at least three (3) inches deep which extends from the intersection with the public paved road surface for the full width of the unpaved exit surface for a distance of at least 50 feet. Identify gravel size in inches, the pad width in feet, including the length and depth of the gravel below.
Paved Surface: Extends from the intersection with the paved public road surface for the full width of the unpaved access road for at least 50 feet to allow mud and dirt to drop off of vehicles before exiting the site.
Identify the width and length of the paved surface below in feet.
Mud and dirt deposits within an urban area shall be cleaned immediately when trackout or carryout extends a cumulative distance of 50 linear feet or more otherwise clean up must be at the end of the workday.
Wheel Washer: Uses water to dislodge debris from tires and vehicle undercarriage. If utilizing a wheel washer describe the location, type and operation of the wheel washer below.
Other - describe any other measure utilized to prevent trackout below.
SECTION M-4
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 346 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
TREATMENTS FOR PREVENTING CARRYOUT
Report the required treatments that will be used for preventing carryout from occurring on paved public roads. Carryout occurs when materials from emptied or loaded haul trucks, vehicles, or trailers fall onto a paved public road or paved shoulder of a paved public road. Check all that apply.
No haul trucks will be routinely entering or leaving the project site explain below.
Emptied Haul Trucks:
Interior cargo compartments will be cleaned before leaving the project site. Explain below how emptied haul truck will be washed and the source of the water supply.
Cargo compartment will be covered with a tarp or suitable cover before leaving the project site.
Loaded Haul Trucks:
Haul trucks will be loaded such that the freeboard is not less than six inches.
Other describe below.
Spillage or loss of materials from holes or other opening(s) in the cargo compartment will be prevented when material transported onto any paved public access road.
SECTION M-5
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 347 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) Project Name Project CUP #
Check and report below the methods and frequency for cleaning up carryout and trackout from the surface and paved shoulder of paved public roads. All material tracked or carried out onto paved road must be removed. Check all that apply.
The use of blower devices, or dry rotary brushers or brooms, for removal of carryout and trackout from paved public roads is not recommended.
The project is located in
An Urban Area
Minimum cleanup frequency will be at the end of the workday and removed immediately if carryout and trackout, extends beyond 50 feet.
Optional - Clean up Method
Manually sweeping and picking up.
Mechanical sweeping with a rotary brush or broom accompanied or preceded by water.
Describe types of equipment that will be used.
CLEANING UP CARRYOUT AND TRACKOUT
Identify the urban area by location, description etc. below.
Non Urban Area
At the end of the workday
Identify the non urban area by location, description etc. below.
SECTION M-6
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 348 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) I certify that all information contained herein and information submitted in the attachments to these documents are true and correct.
Print Name Title
Signature Date
Phone Number Fax Number
Cell Number
Records and/or any other supporting documents used for the demonstration of compliance must be maintained for two years and provided to the Air Pollution Control District upon request.
Project Name Project CUP #
RECORD KEEPING
CERTIFICATION
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
17.b
Packet Pg. 349 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
65 16. IMPERIAL IRRIGATION DISTRICT REQUIREMENTS
There is a newly constructed Date Drain Underground Pipeline and other IID facilities installed by Imperial Irrigation District (IID) Water Department within the project excavation limits. As a portion of the roadway improvements along South Imperial Avenue will be installed over the proposed underground Date Drain within the IID Easement, a securement of an encroachment permit for permanent and temporary (construction) is required.
The City of El Centro has submitted the Encroachment Permit Application to IID during the design phase.
Encroachment Permit Number 4078 was issued to the City of El Centro by the Imperial Irrigation District (IID) to construct South Imperial Avenue over the underground Date Drain.
The City of El Centro forwarded the Imperial Irrigation District a fee to cover the Engineering Services, permit review fees, administration and inspection fees, and the construction cost for the relocation of power lines. No additional fees shall be required to be forwarded to the Imperial Irrigation District by the Contractor.
It shall be the responsibility of the Contractor to provide the Imperial Irrigation District a Hold Harmless/Indemnity Statement and Certificate of Liability Insurance naming the Imperial Irrigation District as an additional insured per the Imperial Irrigation District’s requirements. The Contractor shall also coordinate with the City of El Centro regarding any other requirements required by the Imperial Irrigation District. The Contractor shall comply with all provisions of the Imperial Irrigation District Encroachment Permit and include the cost of the provisions within his/her bid amount.
The Imperial Irrigation District Encroachment Permit Applications follows:
SECTION CONTINUED WITH THE IMPERIAL IRRIGATION DISTRICT ENCROACHMENT PERMIT APPLICATION.
17. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION Stormwater Pollution Prevention Plan shall conform to the provisions in Section 13, "Water Pollution Control," of the Standard Specifications. A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the project by the City of El Centro. The SWPPP is a part of the contract documents. The Contractor shall install the Best Management Practices (BMPs) as required in the SWPPP. The Contractor shall provide a Qualified SWPPP Practitioner (QSP) to complete establishing, monitoring, maintaining, and reporting for the Best Management Practices (BMPs) in accordance with the SWPPP.
18. TRAFFIC SIGNALIZATION MODIFICATION
The Contractor shall coordinate with the Caltrans representative(s) to adjust/activate the existing traffic signalization system for the permanent traffic movement configuration at the intersection of I-8 and South Imperial Avenue prior to opening South Imperial Avenue. Traffic signalization timing, detectors, cameras, electrical system, and all other components to have the signalization properly function shall be adjusted and modified per the Caltrans requirements. The cost associated with the examination of the signalization system, adjustments and modifications to the traffic signalization system, coordination with the Caltrans representative(s), and any other associated work required to have the signalization system fully functional at the I-8/South Imperial Avenue Interchange shall be included in the lump sum price paid for the “Traffic Signal Modification” Bid Item and no additional compensation shall be provided therefor.
19. COORDINATION BETWEEN PHASE I AND PHASE II CONTRACTORS A. Native Material Cut and Fill
17.b
Packet Pg. 350 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
66 During the design phase of Phase I and Phase II South Imperial Avenue Extension Projects, the new roadway was designed so that the cut and fill from the combined Phase I and Phase II Projects will be balanced. The Phase I Project Scope of Work requires a large amount of fill to establish the embankment and to tie in the I-8 Interchange Bridge and the South Imperial Avenue Roadway Extension. The Phase II Project Scope of Work requires mostly cut. As the Phase I and Phase II Projects are scheduled to be constructed simultaneously, coordination between the Contractors for the Phase I and Phase II Projects will be required.
The Phase II Project Contractor shall remove overgrown vegetation from the excavated native material. The removed and screened native material free of trash, tree roots, organic materials, and large rocks shall be delivered at or near the intersection of Wake Avenue and South Imperial Avenue within the City of El Centro Right-of-Way.
The Phase I Project Contractor shall utilize the native material delivered and stockpiled by the Phase II Contractor to establish the subbase design grade. The Phase I Project Contractor shall remove and dispose of excess native material. The Phase I Project Contractor shall supply additional imported native material if needed.
B. Traffic Signalization at the South Imperial Avenue and Wake Avenue Intersection Phase II Project Scope of Work of the South Imperial Avenue Extension consists of the installation of traffic signalization at the intersection of Wake Avenue and South Imperial Avenue. The Phase I Contractor shall install conduits that are required by the Phase II Traffic Signalization Plan prior to paving and constructing the P.C.C. infrastructures including the corner ramps, sidewalk, and curb and gutter at the said intersection. The Contractor shall coordinate with the City of El Centro and the Phase II Contractor in order to avoid any conflicts with the signalization installation prior to constructing the roadway infrastructures.
The Phase II Signalization Plan and Electrical Plans follow:
SECTION CONTINUED WITH THE PHASE II SIGNALIZATION AND ELECTRICAL PLANS.
17.b
Packet Pg. 351 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
67 20. CALTRANS ENCROACHMENT PERMIT
The project roadway improvements are primarily located within the City of El Centro Right-of-Way; however, the roadway tie-in/adjustment work at the Caltrans I-8 bridge and the City of El Cento South Imperial Avenue Extension occurs within the Caltrans Right-of-Way. The signage and striping revisions to/from the on/off ramps and at the intersection of I-8 and South Imperial Avenue are also to be completed within the Caltrans Rightof-Way. Traffic control plans to revise the existing signage and striping/pavement markers shall be prepared by the Contractor unless Caltrans Standard Plans will be implemented. The Contractor shall be responsible for obtaining approvals from the Caltrans Resident Engineer for the alterations or modifications to be made to the traffic control plans. The cost for the preparation and implementation of the traffic control plans for the adjustment work to occur within Caltrans Right-of-Way shall be included in the proposal bid schedule item for “Traffic Control.“ The cost for signage and striping/pavement markers adjustments/replacement/installation shall be included in the proposal bid schedule item for “Signage and Striping.”
An encroachment permit application was submitted to Caltrans by the City of El Centro during the design phase. The Contractor is responsible for obtaining a “Double” Encroachment Permit from Caltrans District 11 Permit Office after the Encroachment Permit Application is approved. The Contractor is responsible to pay for the cost of the “Double” Encroachment Permit. The Contractor shall include the costs of the “Double” Encroachment Permit and all other costs associated with the Certificate of Liability Insurance, complying with the Encroachment Permit’s provisions, conforming to the latest Caltrans Standard Specifications and Plans, and adhering to the Caltrans Resident Engineer’s requirements, in his/her proposal bid schedule item for “Mobilization.” For the purposes of bidding, the Contractor shall include a cost of $5,000.00 for the “Double” Encroachment Permit. If at the time of the issuance of the Encroachment Permit the actual cost of the “Double” Encroachment Permit is less than $5,000.00 then a negative change order shall be processed compensating the City of El Centro for the difference between the $5,000.00 bid amount and the actual encroachment permit cost. If the actual cost of the “Double” Encroachment Permit is greater than $5,000.00 then a positive change order shall be processed compensating the Contractor for the difference between the $5,000.00 bid amount and the actual encroachment permit cost.
A copy of the Caltrans Encroachment Permit, which includes the estimated Encroachment Permit Fees and the provisions to be complied with, follows:
SECTION CONTINUED WITH THE CALTRANS ISSUED ENCROACHMENT PERMIT
17.b
Packet Pg. 352 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
68 21. CERTIFICATE OF COMPLIANCE VERIFICATION
Certificates of Compliance shall be submitted by the Contractor for selected construction items during the submittal phase in accordance with the governing agency’s(ies’) requirements and the Contract Documents. Prior to installing the pre-approved construction items by the Certificates of Compliance, the actual items delivered to the project site shall be inspected, verified and approved by the Engineer. The Contractor shall not install the construction items unless the Engineer satisfactorily complete the inspection and verify the delivered construction items conform with the batch numbers, lot numbers and any other product data indicated on the previously submitted Certificates of Compliance for the construction items.
22. CATEGORICAL EXEMPTION/CATEGORICAL EXCLUSION DETERMINATION FORM
CONDITIONS
In accordance with the Caltrans NEPA Determination for Federal-Aid Project Number STPL-5169(049) dated April 26, 2018 (included at the end of this section) the following conditions apply to this project and must be adhered to:
Air Quality
As part of the specifications for construction contracts, the Caltrans requirements relative to air quality impacts must be used on this project. The proposed action must conform to the following provisions in Section 14-9.02, “Air Pollution Control,” of the 2015 Standard Specifications:
Comply with air-pollution-control rules, regulations, ordinances, and statutes that apply to work performed under the Contract, including those provided in Government Code Section 11017 (Public Contract Code Section 10231).
Do not dispose of material by burning
It is recommended that the following measures be incorporated into the project to minimize the emission of fugitive dust, PM10, and PM2.5 :
1. Standard Mitigation Measures for Construction Equipment Use alternative fueled or catalyst-equipped diesel-construction equipment, including all off-road and portable diesel-powered equipment.
Minimize idling time either by shutting equipment off when not in use of reduce the time idling to five minutes as a maximum.
Limit, to the extent feasible, the hours of operation of heavy-duty equipment and/or the amount of equipment in use.
Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set).
2. Enhanced Mitigation Measures for Construction Equipment Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing construction activity during the peak hour vehicular traffic on adjacent roadways. Implement activity management (e.g., rescheduled activities to reduce short-term impacts).
3. Standard Mitigation Measures for Fugitive PM10 Control All disturbed areas, including bulk material storage which is not being actively utilized, shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by using water, chemical stabilizers, dust suppressants, tarps, or other suitable material such as vegetative ground cover.
17.b
Packet Pg. 353 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
69 All on-site and off-site unpaved roads shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by paving, chemical stabilizers, dust suppressants, and/or watering.
All unpaved areas of one acre of more with 75 or more average vehicle trips per day shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by paving, chemical stabilizers, dust suppressants, and/or watering. The transport of bulk material shall be completely covered, unless six inches of freeboard space from the top of the container is maintained with no spillage and loss of bulk material. In addition, the cargo compartment of all haul trucks is to be cleaned and/or washed at delivery site after removal of bulk material.
All track-out or carry-out shall be cleaned at the end of each workday or immediately when mud or dirt extends a cumulative distance of 50 linear feet or more onto a paved road within an urban area. Movement of bulk material handling or transfer shall be stabilized prior to handling or at points of transfer with the application of sufficient water, chemical stabilizers, or by sheltering or enclosing the operation and transfer line.
The construction of any new unpaved road is prohibited within any area with a population of 500 or more, unless the road meets the definition of a temporary unpaved road. Any temporary unpaved road shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emission by paving, chemical stabilizers, dust suppressants, and/or watering.
Noise
Caltrans Standard Specifications Section 14-8.02 includes noise control requirements that restrict construction noise (Caltrans 2015) and should be followed:
Construction noise levels shall not exceed 86 dB (A) Lmax at 50 feet from the job site activities between the hours of 9:00 p.m. to 6:00 a.m.
Biology
All vegetation removal shall take place between October 1 and December 31, outside the avian nesting season. A qualified biologist shall conduct a nesting bird survey prior to removal of vegetation removal is required during the avian nesting season (January 1 through September 30). If active nests are found, appropriate avoidance buffers would be established as determined by a qualified biologist based on the species involved, site conditions, and type of work to be conducted. No construction activities would occur within the buffer area until the nest is no longer active.
A worker environmental training program shall be prepared by a qualified biologist. Special-status bird species with the potential to occur on or adjacent to the PIA shall be identified in the worker training program.
Instructions shall be provided on limiting construction activities to within the PIA. The worker training shall be conducted for construction foremen and workers a by a qualified biologist. The worker environmental training shall include the following:
1. Description of species
2. Biology of species
3. Wallet card with species picture/guidelines for protecting the species, and
4. Notification procedures if individual (dead, alive, or injured) is found on or near site.
A preconstruction survey shall be performed within 14 days prior to start of construction. A report detailing the preconstruction survey shall be submitted to the Caltrans.
1. If burrows are found within 100 meters of construction from October 16 to March 31; 200 meters of construction for construction from August 16 to October 15; and 500 meters of construction for construction occurring between April 1 and August 15th any occupied burrows shall be sheltered in place using hay bales or barricades and monitored daily during breeding season and weekly in the non-breeding season. The biologist shall have the
17.b
Packet Pg. 354 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
70 authority to establish minimum distances to active nests and to stop work if owls are showing signs of distress. If sheltering in place is not feasible, passive relocation of the owls shall be required after consultation with CDFW and described here.
2. After consultation with CDFW, artificial burrows (minimum of 50 feet apart) shall be installed using the guidelines found in the Imperial Irrigation District Artificial Burrow Installation Manual or other applicable manuals unless suitable burrows are available in proximity.
3. After consultation with CDFW, owls shall be excluded by installation of one-way doors into the opening of the burrows. Burrows shall be scoped prior to excavation. One-way doors shall be left in place for 48 hours, if scoping indicates occupancy. Excavation shall be done using hand tools and refilled to prevent reoccupation.
After a burrow is collapsed, the contractor shall immediately disk down the area or excavate the burrow by hand to prevent reoccupation.
4. Site monitoring shall occur prior to, during, and after owl exclusion. Documentation (i.e., pictures, note taking) shall be made and a report shall be prepared and sent to CDFW.
5. Visible markers shall be placed near burrows to ensure that equipment and machinery does not collapse burrows.
6. Lighting shall be limited to areas required for operations or safety, shall be directed on-site to avoid back scatter, and shall be shielded from public view to the extent practical. Lighting that is not required to be on during nighttime hours shall be controlled with sensors or switches operated such that lighting shall be on only when needed.
17.b
Packet Pg. 355 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
71 17.b
Packet Pg. 356 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
72 17.b
Packet Pg. 357 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
73 17.b
Packet Pg. 358 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
74 17.b
Packet Pg. 359 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
75 23. BUY AMERICA REQUIREMENTS REVISIONS
In accordance with the Caltrans Memorandum issued on December 30, 2013 with regard to the Buy America (BA) requirements as per the direction of the Federal Highway Administration (FHWA), the conditions indicated in the aforementioned memorandum apply to this project and the memorandum follows this specifications section.
17.b
Packet Pg. 360 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
76 17.b
Packet Pg. 361 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
77 17.b
Packet Pg. 362 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
78 17.b
Packet Pg. 363 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
79 24. PROJECT SIGNS
1. California requires a project identity sign for all construction projects in the State of California. At a minimum this sign must have the project name, the awarding agencies’ information, the funding agencies’ information. The project identity sign shall be installed at locations designated by the Construction Manager.
2. California requires a Contractor’s identity sign for all construction projects in the State of California. At a minimum this sign must have the Contractor’s name, address, telephone number, State Contractor’s License number and an afterhour’s emergency telephone number for safety, police and fire emergencies. The Contractor’s identity sign shall be installed at locations designated by the Construction Manager.
3. California and Federal labor laws require employee notices and posters be provided at all project sites that employ workers. Federal labor laws for Public Works projects require the current Federal Wage Decisions to be posted and maintained at the project site for the duration of a construction project. California labor laws for Public Works projects require the current State Wage Decisions to be posted and maintained at the project site for the duration of a construction project. In addition there are EEO, OSHA and other required postings to be posted and maintained at the project site for the duration of the construction.
4. A clear Plexiglass plate is to be placed over the sign to protect the posters from the elements.
5. The Contractor is responsible for providing, installing and maintaining the project signs required by this section. The Project signs shall be submitted to the Construction Manager as a submittal document for review and approval. The Project signs are to be erected at the project site prior to commencement of any work activities. The Project signs are to remain posted for the entire duration of the project.
Schematic project signs follow this specification section.
17.b
Packet Pg. 364 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
80 17.b
Packet Pg. 365 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
81 END OF SPECIAL CONDITIONS
17.b
Packet Pg. 366 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
82 TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
1 GENERAL………………………………………………………………….83
2 MOBILIZATION…………………………………………………………..83
3 SUBBASE PREPARATION…………………………………………….. 83
4 SUBGRADE PREPARATION……………………………………………84
5 IMPORTED NATIVE MATERIAL………………………………………84
6 SAND………………………………………………………………………86
7 CLASS 2 BASE………………………………………………………….. .86
8 P.C.C. CONCRETE………………………………………………………..87
9 HOT MIX ASPHALT……………………………………….…………….88
10 CRACK SEALING………………………………………………………88
11 SLURRY SEALCOAT…………………………………………………..90
12 TACK COAT (SS1H) APPLICATION………………………………….98
13 STRIPING APPLICATION……………………………………………..98
17.b
Packet Pg. 367 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
83 TECHNICAL SPECIFICATIONS
1. GENERAL
The Technical Specifications for this project shall be the State of California Department of Transportation Standard Specifications (latest edition) and the Standard Specifications for Public Works Construction, “The Greenbook” (SSPWC) for any items which are not specified in the Caltrans Standard Specifications. If there is any discrepancy between the Caltrans Standard Specifications and the Greenbook, the most stringent requirement shall prevail.
2. MOBILIZATION
Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the Project site for all other work and operations that must be performed or costs incurred before beginning work on the various Contract items on the Project site. Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:
1. Obtaining all permits, licenses, insurance, and bonds. Providing copies to the Construction Manager;
2. Moving onto the Jobsite all of the Contractor’s material and equipment as required;
3. Developing construction water supply;
4. Providing restroom facilities;
5. Providing potable water facilities as specified. This includes a means by which all on-site Contractor, Subcontractor, or supplier personnel can wash their hands with soap. It also includes providing potable drinking water to the construction personnel at the project site;
6. Pot-holing to verify the locations of the existing utilities within the limits of construction;
7. Submitting all required Subcontractor insurance certificates, bonds, and contract agreements with subcontractors;
8. Paying Taxes and Freight;
9. Posting all CAL/OSHA required notices and establishment of safety programs;
10. Having the Contractor’s representative at the Jobsite full time;
11. Furnishing of Construction Schedule, Contract Price Breakdown (Schedule of Values), Submittal Documents, and Submittal Schedules;
12. Preparing and providing As-Built drawings;
13. Attending Project meetings;
14. Complying with the Air Pollution Control District Permit Requirements and paying the associated fees;
15. Obtaining Caltrans Encroachment Permit (Double Permit), complying with the Caltrans Encroachment Permit requirements, and paying the associated fees;
16. Complying with the IID Encroachment Permit requirements;
17. Complying with the Environmental Mitigation Measurements and Requirements;
18. Providing Project Signs (Contractor’s Identity Sign and Project Identity Sign);
19. Complying with the funding source requirements and filling out the required forms (Caltrans LAPM forms); and
20. Paying other miscellaneous fees.
All costs incurred for the mobilization and the associated work shall be included in the Bid Item for the Mobilization cost and no additional compensation shall be provided therefor.
3. SUBBASE PREPARATION
The native material beneath P.C.C. concrete and asphalt concrete infrastructure including but not limited to P.C.C. sidewalk, driveway, curb and gutter, handicap ramp, barrier curb and A.C. pavement shall be excavated to 0.05 feet of design subbase grade. The design subbase grade shall be field verified and approved by the Construction Manager prior to the placement of granular sand fill, or Class 2 Base. The
17.b
Packet Pg. 368 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
84 Construction Manager shall determine the number and location of points to check for the subbase grade elevation compliance. Prior to the Construction Manager’s inspection of the subbase grade the Contractor shall establish bluetop hubs (stakes set to design subbase grade) 25 feet on center along street sections. The stakes shall be established at the edge of pavement, centerline and hinge points/grade breaks across the street sections. Bluetop stakes shall also be placed at 25 foot stations along barrier curb lines.
4. SUBGRADE PREPARATION
The Class 2 Base beneath A.C. pavement and concrete infrastructure shall be placed to within 0.02 feet of design subgrade prior to the placement of A.C. pavement or P.C.C. concrete. The Construction Manager shall field verify the subbase elevations in the field prior to the placement of Class 2 Base material. Placement of P.C.C. concrete or A.C. pavement shall not be allowed until the Construction Manager has approved the subgrade design grade. Prior to the Construction Manager’s inspection of the subgrade, the Contractor shall establish bluetop hubs (stakes set to design subgrade) 25 feet on center along street sections. The stakes shall be established at the edge of pavement, centerline and hinge points/grade breaks across the street sections. Bluetop stakes shall also be placed at 25 foot stations along barrier curb and curb and gutter lines.
5. IMPORTED NATIVE MATERIAL
A. MATERIALS
Materials for native material fill shall consist of any material imported or excavated from the cut areas that, in the opinion of the Engineer, is appropriate for use in constructing fills. The material shall contain no rocks or hard lumps greater than 12 inches in size and shall contain at least 40 percent of material smaller than ¾-inch in size. Materials greater than 6 inches in size shall be placed by the Contractor in windrows on a clean, overexcavated or unyielding compacted fill or firm natural ground surface. Select native or imported granular soil (sand equivalent greater than 30) shall be placed and thoroughly flooded over and around all windrowed rock, such that voids are filled. Windrows of oversize material should be staggered so that successive strata of oversized material are not in the same vertical plane. No nesting or rocks shall be permitted. No material of a perishable, spongy, or otherwise of an improper nature shall be used in filling.
Material placed within 24 inches of rough grade shall be select material that contains no rocks or hard lumps greater than 6 inches in size and that swells less than 3 percent when compacted and when subjected to an axial pressure of 160 PSF, if not specified in the Geotechnical report.
Representative samples of material to be used for fill shall be tested in the laboratory by the Geotechnical Engineer engaged by the Contractor in order to determine the maximum density, optimum moisture content, sand equivalent and classification of the soil. In addition, the Geotechnical Engineer shall determine the approximate bearing value of a recompacted saturated sample by direct shear tests or other tests applicable to the particular soil.
During grading operations, soil types other than those analyzed in the report of the soil investigation may be encountered by the Contractor. The Geotechnical Engineer engaged by the Contractor shall be consulted to determine the suitability of these soils as directed by the Engineer. The Contractor shall bear the expenses of the Geotechnical investigation.
B. EXECUTION
a. General:
The subbase grade shall be excavated to within plus or minus 0.05 feet of design grade prior to the placement of native material fill. The design subbase grade shall be field verified and approved by the Engineer prior to the placement of the fill material. The Engineer shall determine the number and location of points to check for the subbase grade elevation compliance.
17.b
Packet Pg. 369 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
85 Native material fill shall be placed in maximum 8-inch lifts and compacted to 90 percent of maximum density at optimum water content per ASTM D 1557 unless otherwise specified on the Plans. Additional native soil lifts shall not be placed until previous lifts have attained the specified compaction requirement and are approved by both the on-site geotechnical representative and the Engineer.
b. Preparing Areas To Be Filled:
All vegetation and objectionable material shall be removed by the Contractor from the surface upon which the fill is to be placed and any loose and porous soils shall be removed or compacted to a depth specified by the Geotechnical Engineer. The surface shall then be plowed or scarified to a minimum depth of 6 inches until the surface is free from uneven features that would tend to prevent uniform compaction by the equipment to be used.
When placing fill in horizontal lifts adjacent to areas sloping steeper than 5:1 (horizontal:vertical), horizontal keys and vertical benches shall be excavated into the adjacent slope area. Keying and benching shall be sufficient to provide at least 6-foot wide benches and a minimum of 4 feet vertical bench height within the firm natural ground, firm bedrock or engineered compacted fill. No compacted fill shall be placed in an area subsequent to keying and benching until the area has been reviewed by the Geotechnical Engineer. Material generated by the benching operation shall be moved sufficiently away from the bench area to allow for the review of the horizontal bench prior to placement of fill.
After the foundation for the fill has been cleared, plowed or scarified, it shall be disced or bladed by the Contractor until it is uniform and free from large clods, brought to the proper moisture content and compacted as specified.
c. Placing, Spreading and Compacting Fill Material:
The fill material shall be placed by the Contractor in thin layers that when compacted shall not exceed 8 inches for native material. Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to obtain uniformity of material in each layer.
When the moisture content of the fill material is below that required by the Geotechnical Engineer, water shall be added by the Contractor until the moisture content is as required for the specified compaction.
When the moisture content of the fill material is above that required by the Geotechnical Engineer, the fill material shall be aerated by the Contractor by blading, mixing, or other satisfactory methods until the moisture content is as required for the specified compaction.
After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted by the Contractor to the specified density. Compaction shall be accomplished by sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-tired rollers or other types of acceptable compacting equipment. Equipment shall be of such design that it shall be able to compact the fill to the specified density. Compaction shall be continuous over the entire area and the equipment shall make sufficient passes over the material to ensure that the desired density has been obtained.
Compacted fill slopes shall be overbuilt and cut back to grade, exposing the firm, compacted inner core. The slopes shall be overbuilt a minimum of five feet (5’). If the desired compaction is not achieved, the existing slope shall be overexcavated and reconstructed. The amount of overbuilding
17.b
Packet Pg. 370 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
86 shall be increased until the desired compaction is achieved on the slope. The Contractor shall provide thorough mechanical compaction to the outer edge of the overbuilt slope surface. There shall be no excessive loose soil on the slopes.
The Contractor shall provide and maintain adequate erosion control facilities during the construction of the fill areas. The erosion control facilities shall be maintained in optimum condition until the permanent drainage system and vegetation is complete. The facilities shall be inspected following significant rainfall, repairs made and excess sediment removed. It shall be the Contractor’s responsibility to prevent the discharge of sediment off-site or to adjacent watercourses.
6. SAND
Clean granular sand free of clay, shale and deleterious material shall be delivered to the site and placed as noted on the plans. Sand shall be compacted to 90 percent of maximum density at optimum water content per ASTM D-1557 unless otherwise noted on the plans. The material shall conform to a sand equivalent of 30 or greater. The maximum amount of material passing the number 200 sieve shall be 6 percent. The sand shall conform to the following gradation percentages:
SIEVE SIZE PERCENT PASSING
3/8” 100
NO. 4 98-90
NO. 8 90-75
NO. 10 75-60
NO. 16 60-50
NO. 30 50-38
NO. 40 38-29
NO. 50 29-19
NO. 100 19-7
NO. 200 6-0
The Contractor shall supply a five gallon sample of sand material to the material testing laboratory within four (4) days after the Notice to Proceed is issued. The gradation, sand equivalent and maximum density of the sand material shall be determined. The test results shall be forwarded to the Construction Manager. The cost of testing shall be incurred by the Contractor. The gradation of the granular sand shall be determined and the test results forwarded to the Construction Manager prior to the delivery of the granular sand material to the construction site. Prior to the placement of sand the native subbase grade shall be checked and approved by the Construction Manager.
7. CLASS 2 BASE
The Class 2 Base material shall conform to Caltrans Section 26, latest edition, for ¾-inch maximum base material.
The gradation requirements are as follows:
SIZE PERCENT PASSING
1 IN/25.00MM 100
¾ IN/19.00MM 87-100
#4/4.75MM 30-65
#30/600MM 5-35
#200/75.00MM 0-12
The sand equivalent shall be 25 or greater. An angular aggregate is to be used. Class 2 Base material shall be compacted to 95 percent of maximum density according to ASTM D-1557, unless otherwise noted on the plans or details. The tolerance for the Class 2 Base between design subgrade elevation and actual subgrade elevation as constructed in the field shall be plus or minus 0.02 feet as referenced from the design subgrade. Prior to the
17.b
Packet Pg. 371 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
87 placement of Class 2 Base the native subbase grade shall be checked and approved by the Construction Manager.
The native subbase grade shall be within plus or minus 0.05 feet of subbase design grade prior to the placement of Class 2 Base.
The Contractor shall supply a five gallon sample of the Class 2 Base to the material testing laboratory within four (4) days of the Notice to Proceed. The material shall be delivered to the testing laboratory to determine the maximum density, gradation, R-value, sand equivalent and durability index of the Class 2 Base. A copy of the test results shall be forwarded to the Construction Manager by the geotechnical consultant for review. The gradation of the Class 2 Base shall be determined and the test results forwarded to the Construction Manager for approval prior to the delivery of the Class 2 Base material to the construction site. Class 2 Base utilizing recycled materials shall not be allowed.
8. P.C.C. CONCRETE
P.C.C. concrete, utilized for but not limited to, curb and gutter, barrier curb, spandrels, cross-gutter, valley gutter, ribbon gutters, residential and commercial driveways, alley entrances, sidewalks and all other concrete infrastructure shall contain a minimum of 7 sacks of cement per cubic yard and attain 5,000 p.s.i. Compressive strength after 28 days curing unless stated otherwise on the plans. A concrete mix design is to be submitted to the Construction Manager within five (5) days after the issuance of the Notice to Proceed. New formwork shall be utilized in the construction of every concrete facility. The formwork shall be true to line and grade. The vertical flowline elevation tolerance shall be +/- 0.02 feet for design grade for slopes of 1.0% or greater, +/- 0.01 for design grade for slopes less than 1.0%. The Construction Manager shall check the formwork for line and grade prior to the placement of concrete. Concrete "curb machines" shall not be allowed for curb and gutter and ribbon gutters designed at a slope of 1 percent or less. The subcontractor shall notify the Construction Manager 72 hours prior to the required inspection. Exposed surfaces of concrete areas shall receive a double trowel finish.
Weakened plane joints shall be placed every 8 lineal feet for ribbon gutter, cross gutter and valley gutter construction unless otherwise illustrated on the Plans. Expansion joints shall be placed every 64 feet along curb and gutter, barrier curb, valley gutter and sidewalk construction unless otherwise illustrated on the Plans.
Installation of curb and gutter, valley gutter and cross-gutters shall begin at the lowest elevation and proceed uphill. A total of one (1) set of cylinders and one (1) slump test shall be required for every 50 cubic yards of concrete, except that a minimum of one (1) set of cylinders and slump test shall be required each day twenty (20) or more yards of concrete are placed at a project site. The maximum allowable slump shall be 4 inches. A set of cylinders shall be composed of three (3) cylinders. The first cylinder of a set shall be tested after seven (7) days curing. The second cylinder of a set shall be tested after 28 days curing. The third cylinder shall be held in reserve and tested if directed by the Construction Manager. The test results will be forwarded to the Construction Manager for review. The Construction Manager shall receive a concrete vendor slip for each truck load of concrete delivered to the project site.
Prior to the placement of concrete, the subgrade depth shall be inspected to insure that the full depth of concrete, as noted on the plans, is attained. Excess fill material shall be removed as required by the Construction Manager.
The form boards shall be checked for the proper elevation. Compaction tests on the subgrade shall have achieved the density requirements specified. The Construction Manager shall then allow the placement of concrete.
The concrete shall be screeded and floated. All edges shall be struck with a concrete edger. Weakened plane joints shall be established at right angles to the sidewalk edge as illustrated on the Plans. The weakened plane joints shall be 3/8 inch in width and 3/4 inch in depth. Expansion joints consisting of 1/2 inch thick joint material shall be placed across the full section of the P.C.C. sidewalk every 64 lineal feet, or as required by the Plans.
After the concrete surface has been floated and cured adequately, it shall receive a double trowel finish. The troweling shall be accomplished by hand with a steel trowel. The surface of the concrete shall receive a light broom finish after the surface is double troweled. The surface of the concrete shall be smooth and true to grade.
Tolerance for the concrete surface shall be 1/8 inch in 10 lineal feet with maximum high and low variance not occurring in less than 20 feet. The Contractor shall maintain the concrete surface moist or wet for a 24-hour period after the concrete is placed and finished troweled. Placement of burlap bags or used carpet over the concrete surface and a continuous application of water over the concrete surface will be required for a 24-hour period. The concrete surfaces shall be cleaned of all dirt and residue prior to the placement of the concrete sealer.
17.b
Packet Pg. 372 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
88 Concrete shall not be placed after 10:00 a.m. on Fridays.
9. HOT MIX ASPHALT
The asphalt concrete mix shall meet Section 39 of the latest Caltrans Standard Specifications and the following requirements:
Aggregate base shall be 3/4-inch maximum, medium.
Asphalt binder shall be PG 70-10 in accordance with the approved hot mix design.
The asphalt concrete shall be Type “A” as set forth in the state of California, Department of Transportation, Standard Specifications, Section 39, latest edition.
The contractor shall submit an approved, signed and verified job mix formula (JMF) on Caltrans Form CEM-3513 to the City and Caltrans during the submittal phase for approval, 15 days prior to the beginning of the work.
10. CRACK SEALING
The crack sealant shall be composed of a hot-applied, single component, elastically modified composition of asphalt cement, virgin synthetic polymer, recycled rubber and other modifiers. The sealant shall contain no solvent, is prereacted and shall conform to the requirements of Caltrans SSP 37-400 Type 2. The crack sealant shall be a moderately high viscosity pavement preservation sealant intended for street and highway applications for sealing longitudinal and transverse cracks. The crack sealant shall be an effective barrier against damage from debris and moisture infiltration into cracks. The crack sealant shall be a Crafco 34521CA , Deery 80200CA or an approved equal. The crack sealant shall not contain constituents which react adversely with Slurry Sealcoat Material.
The crack sealant shall be melted in a jacketed double boiler type melting unit which is equipped with both agitation and recirculation systems. Direct fired or air heated machines shall not be allowed. The temperature of the heat transfer oil in the melting unit should not exceed 525 degrees Fahrenheit (274 degrees Celsius) during melting of the sealant. The melting unit must be capable of safely heating the sealant to 400 degrees Fahrenheit (204 degrees Celsius). The melting unit shall comply with the requirements of double jacketed boiler melters with effective agitation compliant with Appendix X1.1 of ASTM D 6690. Prior to applying the sealant, it shall be heated to a temperature between the recommended application temperature and the maximum heating temperature as illustrated on the sealant containers and Product Data Sheets. The crack sealant application life is to be monitored and if exceeded either extended or removed and discarded per the manufacturer’s installation instructions.
The pavement surface temperature shall be greater than 40 degrees Fahrenheit prior to crack sealant application.
Lower temperatures may result in reduced adhesion due to the presence of moisture or ice. If the pavement temperature is lower than 40 degrees Fahrenheit it may be warmed using a heat lance that puts no direct flame on the pavement. If installing crack sealant at pavement temperatures below 40 degrees Fahrenheit, extreme care should be used to insure that cracks are dry and free from ice, moisture and other contaminants. The crack sealant shall be maintained at its maximum temperature during applications when the pavement temperature is below 40 degrees Fahrenheit. If crack sealant is applied at night, applicators shall observe the pavement to assure dew does not form on the pavement surface.
Proper crack sealant adhesion requires cracks be thoroughly clean and dry immediately prior to crack sealant installation. Cracks shall be initially cleaned or widened using appropriate routing, brushing or blowing operations.
After initial cleaning and widening and after any debris removal is accomplished a final crack cleaning shall be accomplished by using a high pressure, 90 psi minimum, dry, oil free compressed air unit. Both sides of the prepared cracks shall be inspected to insure the high-pressure air has removed any remaining dust from the initial crack cleaning or routing. The surfaces of the prepared crack shall be inspected to insure adequate cleanliness and dryness prior to the application of the crack sealant. The contractor shall apply a herbicide to any cracks which exhibit vegetative growth 10 days prior to the commencement of construction activities.
17.b
Packet Pg. 373 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
89 Cracks 1/8 inch wide shall be routed to a minimum width of 3/8 inch and a minimum depth of ½ inch. Cracks ¼ inch wide and greater shall be routed for a minimum of 1/8 inch on both sides of the crack and a depth of ¾ inch.
It is recommended that cracks 1 ½ inches and greater not be crack sealed using the crack seal material specified under this Technical Specification Section. Following appropriate cleaning of the routed crack, sealant shall be applied to a slightly overfilled condition and then leveled with a squeegee across the crack with an overlap beyond the crack edges. This method of crack sealing results in an overband condition. Sealant overbands shall not exceed 1/16 inch in height above the pavement and not extend greater than 2 inches beyond crack edges. A detack agent shall be applied to the crack sealant product after application, as determined by the Engineer, to reduce the tackiness and resultant “tracking” of the sealant by vehicular traffic.
The crack sealant material shall conform to the following specifications when heated to its maximum heating temperature in accordance with ASTM D5167:
TEST METHOD CALTRANS SSP 37 – 400 TYPE 2
Cone Penetration ASTM D5329 40 maximum
Softening Point ASTM D36 205 degrees F (96 degrees C) minimum Flexibility ASTM D3111 modified Pass at 32 degrees F
(0 degrees C)
Tensile Adhesion ASTM D5329 400% minimum
Specific Gravity ASTM D70 1.25 maximum
Asphalt Compatibility ASTM D5329 Pass
Sieve Test (Certification nonsoluble components pass #16 sieve) Pass 100% Resilience ASTM D5329 25 – 65 %
Recommended
Application Temperature
ASTM D5167 380 – 400 degrees F
(193 – 204 degrees C)
Maximum Heating Temperature ASTM D6690 400 degrees F (204 degrees C) After the crack sealant material is applied, the debris, loose particles, dirt and pavement residue resultant from the crack cleaning and routing operation shall be removed and disposed of by the Contractor. The Contractor shall remove and dispose of the material resultant from the crack sealing cleaning operation with a vacuum street sweeper at the conclusion of the work day. The street area subject to crack sealing shall be closed to traffic until the crack sealant has sufficiently cured and is not subject to “tracking” by vehicular traffic. One-way traffic shall be maintained along the streets during crack sealing application work.
If equipment being used requires the cleaning out of pumps and plumbing, follow the manufacturer's clean out instructions. If solvent is used for clean out, insure that the solvent does not contaminate the sealant because sealant dilution and flash problems may occur.
Pallets of boxed product are protected with a weather resistant covering. During storage, the protective wrap must be kept on the pallets to prevent boxes from getting wet. If boxes are subjected to moisture, they may lose strength and crush resulting in pallet leaning. If rips in the pallet covering occur during handling, they should be repaired to help maintain packaging integrity. Pallets should be stored on a level surface which is dry and has good drainage.
Pallets should be not stacked because crushing of bottom layers may occur. Sealant material properties are not affected by packaging deterioration.
Since these sealants are heated to elevated temperatures, it is essential that operations be conducted in manners which assure safety of personnel. All associated with use of the material need to be aware of the hazards of using hot applied materials and safety precautions. Before use, the crew should read and understand product use and safety information on each box of sealant and the product MSDS. This sheet which is supplied with each shipment, describes the characteristics of the product as well as any potential health hazards and precautions for safe handling and use. User should check D.O.T. requirements for transportation at elevated temperatures above 212F (100C).
Skin contact with hot applied materials causes burns. Overexposure to fumes may cause respiratory tract irritation,
17.b
Packet Pg. 374 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
90 nausea, or headaches. Appropriate precautions need to be taken to prevent contact with the hot material and to avoid inhalation of fumes for everyone in the vicinity of the sealing operation. Safety precautions should include:
(1) Protective clothing to prevent skin contact with hot material; (2) Care when adding blocks of product to melters to reduce splashing; (3) Careful operation and control of wants or pour pots which are used to apply product; (4) Traffic and pedestrian control measures which meet or exceed local requirements to prevent access to work areas while product is still in a molten state; (5) Avoidance of material fumes; (6) Proper application configurations with a minimum amount of excesses of material; and (7) Appropriate cleanup of excessive applications or product spills.
The Contractor shall be compensated for the crack seal application by the pound of crack sealant material placed.
The Contractor shall furnish all labor, material, transportation and equipment for the installation of the crack sealant.
Street sweeping prior to crack sealing a street section, street sweeping at the conclusion of each day crack sealing work, clean up, traffic control, application of herbicide and protection of utility covers are incidental to the crack seal application costs.
11. SLURRY SEALCOAT
DESCRIPTION
This work shall consist of mixing a formulation of asphaltic emulsion, crushed aggregates, set-control additives, coloring additives, synthetic butadine latex and water and spreading the mixture on a pavement where shown on plans, as specified in these special provisions, and as directed by the Engineer. The material to be utilized for this project shall consist of a Type 2 slurry seal coat with the addition of styrene butadiene latex and other additives.
Construction and materials for emulsion – aggregate slurry shall conform to Subsection 203-5 and 302-4 of the Standard Specifications for Public Works Construction, latest edition, except as modified herein.
MATERIALS
The materials for the modified Type 2 Slurry Seal Coat shall conform to the following requirements:
A. ASPHALTIC EMULSION
Asphaltic emulsion shall be quick-setting type CQS-1h grade conforming to the requirements of these specifications. Quick setting CQS-1h asphaltic emulsion shall conform to the following requirements when tested in accordance with the specified test method.
B. TESTS ON EMULSION
TESTS QUALITY TEST REQUIREMENTS
AASHTO T59 Residue After 60 % MIN.
ASTM D244 Distillation
TESTS ON RESIDUE
AASHTO T49 Penetration at 40 – 90
ASTM 2397 77 F. (25 C)
In addition, quick-setting type CQS-1h asphaltic emulsion shall test positive for particle charge when tested in accordance with ASTM designation: E70. If the particle charge test result is inconclusive the asphaltic emulsion shall meet a ph requirement of 6.7 maximum.
C. AGGREGATE
The aggregate shall be manufactured crushed stone such as granite, slag, limestone, chat, or other high quality aggregate, or combination thereof. Aggregate shall consist of rock dust except that 100 percent of any aggregate or combination of aggregates, larger than the No. 50 sieve size, used in the mix shall be obtained by crushing rock. The material shall be free from vegetation matter and other deleterious substances. All
17.b
Packet Pg. 375 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
91 aggregate shall be free of caked lumps and oversized particles.
D. QUALITY TESTS
The percentage composition by weight of the aggregate shall conform to the following gradings when determined by California Test 202, modified by California Test 105 when there is a difference in specific gravity of 0.2 or more between blends of different aggregates.
TYPE 1 SIEVE SIZE PERCENTAGE STOCKPILE
PASSING TOLERANCE
NO. 4 100 ±5%
NO. 8 90-100 ±5%
NO. 16 60-90 ±5%
NO. 30 40-65 ±5%
NO. 50 25-42 ±4%
NO. 200 10-20 ±2%
TYPE 2 SIEVE SIZE PERCENTAGE STOCKPILE
PASSING TOLERANCE
NO. 4 90-100 ±5%
NO. 8 65-90 ±5%
NO. 16 45-70 ±5%
NO. 30 30-50 ±5%
NO. 50 18-30 ±4%
NO. 200 5-15 ±2%
The job mix (target) gradation shall be within the gradation band for the desired type. After the target gradation has been submitted, then the percent passing each sieve shall not vary by more than the stockpile tolerance.
The aggregate shall also conform to the following requirements:
TESTS CALIFORNIA TEST REQUIREMENTS
SAND EQUIVALENT 217 45 MIN.
DURABILITY INDEX 229 55 MIN.
The aggregate will be accepted at the job location or stockpile. The stockpile shall be accepted based on five gradation tests according to California Test 202, modified by California Test 105 when there is a difference in specific gravity of 0.2 or more between the blends of different aggregates. If the average of the five tests is within the gradation tolerances, then the material will be accepted. If the tests show the material to be out of gradation tolerance, the Contractor will be given the choice to either remove the material or blend other aggregates with the stockpile material to bring it into specification. Materials used in blending must meet the quality test before blending and must be blended in a manner to produce a consistent gradation.
When the results of either the aggregate grading or the sand equivalent tests do not conform to the requirements specified, the aggregate shall be removed. However, if requested in writing by the contractor and approved by the Engineer, the aggregate may be used and the Contractor shall pay to the Owner $1.00 per ton for such aggregate left in place. No single aggregate grading or sand equivalent tests shall represent more than 300 tons or one day’s production, whichever is smaller.
E. WATER
Water shall be of such quality that the asphalt will not separate from the emulsion before the slurry seal is in
17.b
Packet Pg. 376 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
92 place in the work. If necessary for workability, a set-control agent that will not adversely affect the slurry sealcoat surfacing material may be used. Pre-wetting of streets will be required unless otherwise determined by the Engineer. If pre-wetting of the streets is required the Contractor shall perform this work as an incidental item to the placement of the slurry sealcoat material.
F. CARBON BLACK
The carbon black solution shall be cationic or non-ionic in charge and liquid in form. The carbon black must be compatible with the emulsion system, latex and additives being used and shall meet the following specifications:
SPECIFICATIONS TOLERANCES
TOTAL SOLIDS 40 – 44
% BLACK BY WEIGHT 35 – 37
TYPE BLACK MEDIUM FURNACE COLOR
TYPE DISPERSING AGENT NON IONIC
pH 0.5 – 4.5
G. MINERAL FILLER
Portland cement, hydrated lime, limestone dust, fly ash or other approved filler meeting the requirements of ASTM D242 may be used if required by the mix design and may be used to facilitate set times as needed.
Any cement used shall be considered as part of the dry aggregate weight for mix design purposes.
H. ADDITIVES
Additives may be used to accelerate or retard the break-set of the RPM surfacing material. The use of additives shall be in quantities specified in the mix design.
I. LATEX
A styrene butadiene latex shall be added to the slurry sealcoat. Latex shall be a minimum of 2.5% of the weight of the emulsion. The latex shall be injected into the water phase of the emulsion prior to running through the colloid mill. The styrene butadiene latex shall conform to the following chart:
TEST METHOD SPECIFICATION RESULTS
Grade of Material LMCQS in 2.5%
Tests on Emulsion: MIN MAX
Viscosity @ 25ºC, SFS AASHTO T59 15 100
Sieve Test, % AASHTO T59 - 0.10
Particle Charge AASHTO T59 Pos -
Storage Stability, 1 day, % AASHTO T59 - 1
Residue by Distillation, % by Wt AASHTO T59 60.0 -
Tests on Residue by Distillation:
Penetration, .01mm, 5 sec, 25C AASHTO T49 45 80
Solubility in TCE, % ASTM D2042 97.5 -
Ductility, mm/min, mm @ 25C AASHTO T51 400 -
Softening Point, ºF AASHTO T53 - -
17.b
Packet Pg. 377 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
93 LABORATORY EVALUATION
A. GENERAL
Before work begins, the Contractor shall submit a mix design covering the specific materials to be used on the project. The design will be performed by a laboratory who has experience in designing slurry sealcoat surfacing.
After the mix design has been approved, no substitution will be permitted unless approved by the Engineer.
The Contractor shall bear all expenses with regard to the preparation of the mix design.
B. MIX DESIGN
The Contractor, at its expense, shall submit for Engineer approval laboratory reports of mix designs performed in accordance with ASTM D 3910 procedures, utilizing the specific materials to be used. ASTM D 3910 procedures shall be modified to include the retained No. 4 (4.75 mm) aggregate if present in the mix design. The Engineer will approve the mix proportions that are best suited for use on the Work, based upon the emulsion content and water needed to produce a slurry with a maximum loss of 50 grams per square foot (540 grams per square meter) by the modified Wet Track Abrasion Test. For mix designs containing more than 4 percent aggregate retained on the No. 4 (4.75 mm) sieve, the maximum loss will be 60 grams per square foot (650 grams per square meter).
All of the component materials used in the mix design shall be representative of the materials proposed by the Contractor to be used on the project. The percentage of each individual material required shall be indicated in the laboratory report. Adjustments may be required during the construction, based on field conditions.
The component materials shall be within the following limits:
Residual Asphalt Type 1 9.0% - 10.8% based on dry weight of aggregate Type 2 8.4% - 9.6%
Styrene Butadine The butadine latex will be added to the slurry sealcoat mix at a rate of 2.5% + Latex
0.5% by weight of emulsion.
Carbon Black Carbon black shall be added at 1.5% to 3.0% of the finished emulsion.
Mineral Filler 0.5% - 2.0% (if required by mix design) based on dry weight of aggregate.
Additives As needed
Water As needed to achieve proper mix consistency. (Total mix liquids should not exceed the loose aggregate voids)
The Contractor, at its expense, shall calibrate each slurry mixer to be used in the Work according to the approved slurry mix design. The Contractor shall allow 2 days prior to the start of work for calibration and testing at a location to be approved by the Engineer. The Engineer will obtain field samples at the time of calibration for Extraction Test (ASTM D 2172, California Test 382), Consistency Test, and Wet Track Abrasion Test (Modified ASTM D 3910). When in the judgment of the Engineer, the field samples meet the requirements stipulated in these specifications, the Engineer will notify the Contractor to start the work.
PROPORTIONING
Aggregate, asphaltic emulsion, water, latex, additives, including set-control agent if used, and reacted latex shall be proportioned by weight utilizing the mix design approved by the Engineer. If more than one kind of aggregate is used, the correct amount of each kind of aggregate to produce the required grading shall be proportioned
17.b
Packet Pg. 378 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
94 separately, prior to the other materials of the mixture, in a manner that will result in a uniform and homogenous blend.
The completed mixture, after addition of water and any set-control agent used, shall be such that the mixture has proper workability and (a) will permit a traffic flow, without pilot-car-assisted traffic, on the slurry seal within 1 hour after placement (at 78 degrees f.) Without the occurrence of bleeding, separation or other distress, and (b) will prevent development of bleeding, excessive raveling, separation or other distress within 15 days after placing the slurry sealcoat surfacing.
Asphaltic emulsion shall be added at a rate within the approximate following ranges of percent by weight of the dry aggregate. The exact weight will be determined by the mix design and the asphalt solids content of the asphaltic emulsion furnished. The emulsion weight shall be determined prior to and exclusive of the added latex.
Added latex will be in addition to the emulsion.
TYPE 1 15 - 18%
TYPE 2 14 – 16%
The aggregate shall be proportioned by a belt feeder operated with an adjustable cutoff gate. The height of the gate opening shall be readily determinable. The emulsion shall be introduced into the mixer by a positive displacement pump. Water shall be introduced into the mixer through an adjustable multi-spray pugmill bar, water volume shall be displayed by an electronic digital meter registering in gallons delivered.
The bitumen ratio (pounds of asphalt per 100 pounds of dry aggregates) shall not vary more than 0.5-pound of asphalt above or 0.6-pound asphalt below the amount designated by the mix design and approved by the Engineer.
The aggregate belt feeder shall deliver aggregate to the pugmill mixed with such volumetric consistency that the deviation for any individual aggregate delivery rate check-run shall not exceed 2.0 percent of the average of 3 runs of at least 3 tons each in duration. The emulsion pump shall deliver emulsion to the pugmill with such volumetric consistency that the deviation for any individual emulsion delivery check-run shall be within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons each in duration.
PROPORTIONING EQUIPMENT & PROCEDURES
Each slurry sealcoat surfacing unit shall be equipped with a unit designed to store and deliver the various required materials to a single shafted or twin-shafted, multi-paddle pugmill in the following manner:
Each slurry sealcoat surfacing unit shall be equipped with a computer controlled automatic sequencing system that initiates each material delivery at the precise moment necessary to insure proper proportioning.
Each slurry sealcoat surfacing unit shall be equipped with independent storage capabilities for the aggregate, emulsion, latex additives, set-control additives and the carbon black.
The latex additive and the carbon black shall be delivered to the mixer in the relative proportions required by means of a common shaft, dual pump system. The latex additive and the carbon black flow rates shall be independently adjustable by means of diaphragm valves and shall be sequenced through the computer controlled auto-sequencing system. A portion of the latex additives may be added through co-milling with the base asphalt during the emulsion production process. A maximum of 2.5% latex blend may be added in this manner. The balance of the latex shall be added by means of truck mounted introduction systems.
The latex additive and the carbon black shall be blended and mixed prior to their introduction into the pugmill.
Introduction into the twin-shafted pugmill shall be accomplished through an injection system that delivers the blended material to the apex of each mixing shaft immediately prior to the introduction of the asphalt emulsion.
TYPE OF AGGREGATE RANGE
17.b
Packet Pg. 379 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
95 The latex additive delivery system shall each be equipped with a digital electronic flow metering device that reads in gallons/liters per minute. The carbon black and liquid additive systems shall be equipped with non-corrosive acrylic visual flowmeters.
The slurry sealcoat application shall be mixed in a continuous, twin shaft, multi-paddle pugmill mixer. The pugmill shall be equipped with a hydraulically controlled steel pugmill gate for positive discharge operations. No dripping slurry will be allowed.
The emulsion shall be introduced into the mixer by a positive displacement pump. The emulsion storage shall be equipped with a device that will automatically shut down the power to the emulsion pump and aggregate belt feeder when the level of stored emulsion is lowered to within 2” of the suction line.
A temperature indicating device shall be installed in the emulsion storage tank at the pump suction level.
The aggregate shall be proportioned using a belt feeder operated with an adjustable cutoff gate. The height of the gate opening shall be readily determinable.
The aggregate feeder shall be directly connected to the drive on the emulsion pump. The drive shaft of the aggregate feeder shall be equipped with an electronic digital revolution counter reading to the nearest full revolution of the aggregate delivery belt. The belt delivering the aggregate to the pugmill shall be equipped with a device to monitor the depth of the aggregate being delivered to the pugmill. The device for monitoring depth of aggregate shall automatically shut down the power to the aggregate belt feeder whenever the depth of aggregate is less than 70 percent of the target depth of flow. An additional device shall monitor movement of the aggregate belt by detecting revolutions of the belt feeder. The devices for monitoring no flow or belt movement, as the case may be, shall automatically shut down the power to the aggregate belt when the aggregate belt movement is interrupted. To avoid shutdowns caused by normal fluctuations in delivery rates, a delay of 3 seconds between sensing less than desirable storage levels of aggregate or emulsion shall be permitted.
Water delivery shall be adjusted through a diaphragm valve. Water flow rate shall be electronically displayed through a digital meter.
The mixer unit shall not be operated unless all electronic display and revolution counters are in good working condition and functioning and all metal guards are in place. All indicators required by these specifications shall be operational at all times.
The slurry sealcoat surfacing mixture shall be spread by means of a controlled spreader box. The spreader box shall be capable of spreading a traffic lane width and shall have strips of flexible rubber belting or similar material on each side of the spreader box and in contact with the pavement to positively prevent loss of slurry from the ends of the box. All spreader boxes shall be equipped with a motor driven auger when placing slurry sealcoat surfacing material. Rear flexible strike-off blades shall make close contact with the pavement, and shall be capable of being adjusted to the various crown shapes so as to apply a uniform surfacing coat. Flexible drags, to be attached to the rear of the spreader box, shall be provided as directed by the engineer. All drags and strike-off blades (rubbers) shall be cleaned or changed daily if problems with cleanliness and longitudinal scouring occur. The spreader box shall be clean, free of all slurry and emulsion, at the start of each work shift.
SURFACE PREPARATION
Immediately prior to the slurry surfacing operation, the surface shall be cleaned of all loose material, vegetation, and other objectionable material. The pavement surface shall be crack sealed if required by the Contract Documents. Pavement striping shall be removed from the pavement surface and raised pavement markers shall be removed prior to the placement of slurry sealcoat material as required by the specifications. Any vegetation evident along pavement edges shall be treated with a herbicide a minimum of 5 days prior to slurry sealcoat application.
The contractor shall perform the cleaning and sweeping of the pavement surface, removal of striping and removal of raised pavement markers as an incidental cost to the placement of the slurry sealcoat material. The Contractor
17.b
Packet Pg. 380 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
96 shall remove and dispose of sweeping residue. A “kick” broom shall not be used for street sweeping. If water is used cracks shall be allowed to dry thoroughly before surfacing is applied. The surface of the pavement shall be determined to be sufficiently clean by the engineer prior to the application of slurry sealcoat material.
The Contractor shall protect all utility manhole covers, gratings, gas valve covers, water valve covers and survey monument covers from being coated with the slurry surfacing mixture. Suitable means of protection include covering the utility manhole covers, gratings, valve covers, and monument covers with a stick down paper or tape, polyethelyne material or cardboard cutouts shall be accomplished prior to the slurry sealcoat application. Upon completion of the slurry surfacing, the protection devices shall be removed the same day. Removable markings with distances shall be placed on the curb and gutter bordering the streets to identify the utility cover locations.
Wood lath shall be placed along A.C. pavement edges when no curb and gutter borders the street. The distance from the lath to the utility cover shall be written on the lath.
APPLICATION OF SLURRY SEALCOAT SURFACING MATERIAL
A. GENERAL
If required by the Engineer due to ambient temperature or dust conditions, the pavement surface shall be prewetted by fogging ahead of the spreader box. The rate of application of the fog spray shall be adjusted during the day to suit temperatures, surface texture, humidity, and dryness of the pavement but shall be kept to a minimum under all conditions.
The slurry sealcoat surfacing shall be of the desired consistency upon leaving the mixer. A sufficient amount of material shall be carried in all parts of the spreader at all times so that a complete coverage is obtained.
The slurry sealcoat surfacing mixture shall be uniformly spread on the existing surface within the rate specified. The slurry surfacing material shall not be placed when existing pavement temperature is below 60 degrees F, or when rain or freezing temperatures are forecast within the next 24 hours.
Evidence of solidification of the asphalt, balling or lumping of the aggregates, or the presence of uncoated aggregates will be cause for rejection of the slurry.
Slurry shall be applied in such a manner that no ridges shall remain.
The Contractor shall prevent slurry from being deposited on other than asphalt concrete surfaces and shall remove slurry from surfaces not designated to be sealed at no cost to the Owner. The method of slurry removal shall be approved by the Engineer.
At the direction of the Engineer, the Contractor shall repair and reseal all areas of the streets which have not been sealed properly or completely, at no cost to the Owner.
Where the completed slurry is not uniform in color, the street shall be treated to eliminate the color variation at the Contractor’s expense. The method of treatment shall be approved by the Engineer.
B. APPLICATION RATES
The slurry sealcoat surfacing material shall be spread at the following application rates:
Type 1 9 to 11 pounds of dry aggregate per square yard
Type 2 11 to 13.3 pounds of dry aggregate per square yard or
19 pounds of dry aggregate per square yard as indicated on the plans
17.b
Packet Pg. 381 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
97 The spread rate will be sufficient to fill all voids in the existing pavement and to place sufficient material to embed the largest size aggregate particles.
The completed spread rate will be within 10% of the rate determined by the Engineer after consideration of the surface texture of the existing pavement and the physical size of the aggregate in the mix.
The mixture shall be uniform and homogeneous after spreading on the surface and shall not show separation of the emulsion and aggregate after setting.
Any slurry sealcoat surfacing material to be spread in areas inaccessible to the controlled spreader box, may be spread by hand squeegees or other approved methods.
FIELD SAMPLING
During the performance of the Work, the Contractor will take at least two field samples of the mixed slurry per slurry mixer per day. The Wet Track Abrasion test sample shall not be transported until slurry has set as defined by ASTM D 3910. All field samples shall have the following values:
TABLE 302-4.3.3 (A)
Tests Test Method Requirements
Min. Max.
Wet Track Abrasion Test,
Weight loss, gm/ft2
(gm/m2)
Type 1 Aggregate
ASTM D39101 0 50 (540)
Wet Track Abrasion Test,
Weight Loss, gm/ft2
(gm/m2)
Type II Aggregate
ASTM D39101 0 60 (650)
Consistency Test (mm) ASTM D39101 20 40
Extraction Test
(Calculated Emulsion
Content, %)
ASTM D 2172,
California 3822 ± 1.0% of mix design
Water Content, % of Dry
Aggregate Weight
See Note 3 below - 25
1. Modified ASTM D 3910 to include No. 4 (4.75 mm) aggregate or greater and to be performed using field samples.
2. Modified CTM 382 to allow 1000 ± 100 gram sample.
3. Weigh a minimum of 500 grams of homogenized mixed slurry into a previously tarred quart can with a friction lid.
The lid shall be placed on the can to prevent loss of material during transportation. Place the can with the lid off in an oven and dry to constant mass at 230º ± 9ºF (110º ± 5ºC). Cool, reweigh and calculate the water content.
Subsection 6.4.4.7 of ASTM D 3910 may be modified to use a microwave oven for drying the specimen after the abrasion cycle and the debris has been washed off.
If the test results fail to meet the Specifications, the Contractor shall cease slurry laydown operation with the nonconforming mixer until it demonstrates the ability to comply with the Specifications.
No change in the proportions of the approved mix design will be permitted without the Engineer’s approval. If the
17.b
Packet Pg. 382 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
98 Contractor changes it source of supply for either the aggregate or the emulsion, the mix design approval and the quality control procedures specified herein shall be repeated. Mixes used shall not deviate more than ± 1.0 percent from the approved proportion of emulsion. (Example: If the approved mix is 16 percent emulsion, then the emulsion content must be between 15 and 17 percent). The percentage of emulsion is based on the dry weight of aggregate.
MEASUREMENT AND PAYMENT
The Contractor shall be compensated for the slurry sealcoat application by the dry tons of aggregate placed. The Contractor shall furnish all labor, material, transportation and equipment for the installation of the slurry sealcoat application. Material includes asphaltic emulsion, crushed aggregates, set control additives, coloring additives, synthetic butadiene latex, water and all other required materials. Street sweeping, pavement striping removal, raised pavement marker removal, herbicide application to vegetation, clean up, traffic control and protection of utility covers are incidental to the slurry sealcoat application costs.
12. TACK COAT (SS1H) APPLICATION
Tack coat (SS1H) application shall be in accordance with Section 39-2.01C(3)(f) of the latest Caltrans Standard Specifications.
The tack coat shall be applied to the existing pavement surface, between HMA layers, and to vertical surfaces of curbs, gutters, and construction joints per the residual rates shown in Section 39-2.01C(3)(f).
A similar tack coat shall be applied to the surface of any course if the surface is such that a satisfactory bond cannot be obtained between it and a succeeding course.
The contact surfaces of all cold pavement joints, curbs, gutters, manholes, and the like shall be painted with either SS-1h emulsified asphalt or PG 64-10 paving asphalt per the application rate, as specified in the Caltrans Standard Specifications Section 39-1.09C, immediately before the adjoining asphalt concrete is placed.
Full compensation for furnishing all labor, materials, tools, and equipment and for doing all the work involved in tack coat application shall be considered as included in the contract unit price paid per the succeeding course of pavement installed immediately after the application of tack coat and no additional/separate compensation shall be provided for tack coat application.
13. STRIPING APPLICATION
Traffic stripes and pavement markings shall conform to Section 84, “Markings” of the latest Caltrans Standard Specifications, except that Section 84-2.03c(2)(c) sprayable thermoplastic will not be allowed. Pavement markings to be installed/applied in accordance with the locations and requirements illustrated on the striping plans shall be thermoplastic.
All the painted traffic stripes and pavement markings within the Caltrans Right-of-Way shall be thermoplastic.
All the painted traffic stripes shall be applied in three-coats within the City of El Centro Right-of-Way unless thermoplastic is used.
Existing or conflicting striping shall be removed as specified on the plans by hydroblasting or another abrasive mean just enough to remove it and avoid creating a recessed surface. The surface where the stripes and markings were removed shall be covered with fog seal completely. In the case of the pavement marking removal, the fog sealed surface shall be squared to the outer limits of the marking and shall be covered completely.
Striping and pavement markings shall not be applied before 14 days of fog seal or asphalt concrete placement.
Surface cleaning and preparation shall be performed with mechanical wire brushing according to section 84-2.03b Surface Preparation. Striping installation and removal shall be paid at the contract lump sum for the “Signage and
17.b
Packet Pg. 383 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
99 Striping” Bid Item within the bid proposal forms. The respective contract lump sum price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals for doing all the work, including, but not limited to, the following:
Removal and placement of painted lines, markings, and stenciling Fog Seal
Protection of the existing stripes and markers
Temporary pavement markings prior to opening the roadway Temporary tabs. (shall be installed in between final asphalt concrete placement and permanent striping) Surface cleaning and preparation
Traffic stripes. 3 – coats on all striping
Pavement Marking (Thermoplastic)
Raised Pavement Markers
Traffic control plan preparation and implementation (Caltrans approval required for non-standard Traffic Control Plans implementation)
Complete in place, as shown on the plans and as specified herein.
End of Technical Specifications
17.b
Packet Pg. 384 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
100
City of El Centro
Project No. STPL-5169(049)
PROPOSAL BID FORM
TO THE DIRECTOR OF PUBLIC WORKS OF THE CITY OF EL CENTRO:
The undersigned hereby declares that he has carefully examined the location of the proposed work that he has examined the plans and specifications and read the accompanying instructions to bidders and hereby proposes to furnish all material except owner furnished materials, and do all work required to complete the said work in accordance with said plans and specifications and special provisions for the unit prices set forth in the following schedule. The bidder shall furnish prices for all items shown in the proposal.
PROJECT BID SCHEDULE
BID ITEMS
BASE BID
Item
No. Description Quantity Unit Unit Cost Total Cost
1 MOBILIZATION OF
EQUIPMENT AND
MATERIAL, CITY BUSINESS
LICENSE, CALTRANS AND
IID ENCROACHMENT
PERMIT FEE AND
REQUIREMENTS, NEPA
CATEGORICAL EXEMPTION
AND EXCLUSION
DETERMINATIONS, POTHOLING AND
VERIFICATION OF
EXISTING UTILITIES,
PROJECT SIGNS, AIR
POLLUTION CONTROL
DISTRICT REQUIREMENTS
AND FEES, RESTROOM
FACILITIES, POTABLE
DRINKING WATER,
INSURANCE, BONDS,
TAXES, FREIGHT AND
OTHER COSTS NOT
SPECIFICALLY ADDRESSED
WITHIN THIS BID ITEM
LIST.
1 LS $________ $___________
2 SAWCUT THE EXISTING
A.C. PAVEMENT FOR THE
FULL DEPTH OF THE A.C.
PAVEMENT PER
DEMOLITION KEYNOTE NO.
1 ON PLAN SHEETS 4
THROUGH 6.
731 LF $________ $___________
17.b
Packet Pg. 385 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
101
Item
No. Description Quantity Unit Unit Cost Total Cost
3 COLD PLANE THE
EXISTING A.C. PAVEMENT
FOR A THICKNESS OF 0.2
FOOT MIN. PER
DEMOLITION KEYNOTE NO.
2 ON PLAN SHEETS 4
THROUGH 6.
1,462 SF $________ $___________
4 REMOVE AND DISPOSE OF
THE EXISTING A.C.
PAVEMENT PER
DEMOLITION KEYNOTE NO.
3 ON PLAN SHEETS 4
THROUGH 6.
44 CYD $________ $___________
5 CLEAR AND GRUB
EXISTING OVERGROWN
VEGETATION PER
DEMOLITION KEYNOTE NO.
4 ON PLAN SHEETS 4
THROUGH 6.
1 LS $________ $___________
6 EARTHWORK – CUT
GRADE EXISTING
NATIVE/UNDERLYING
MATERIAL TO SUBBASE
DESIGN GRADE PER
DEMOLITION KEYNOTE NO.
3, 4, 6, 8 AND 20 ON PLAN
SHEETS 4 THROUGH 6 AND
CONSTRUCTION KEYNOTE
NO. 15 ON PLAN SHEETS 7
THROUGH 11.
5,600 CYD $________ $___________
7 EARTHWORK - NATIVE
FILL
GRADE AND COMPACT
BRIDGE RAMP, SHOULDER
BACKING, SWALE, AND
BENEATH
INFRASTRUCTURE
INSTALLATION AREA TO
SUBBASE DESIGN GRADE
PER CONSTRUCTION
KEYNOTE NO. 11, 13, 15, 35,
AND 36 ON PLAN SHEETS 7
THROUGH 11.
5,600 CYD $________ $___________
8 EARTHWORK - NATIVE
FILL FROM PHASE II
PROJECT OR IMPORTED
FILL
GRADE AND COMPACT
BRIDGE RAMP, SHOULDER
17,900 CYD $________ $___________
17.b
Packet Pg. 386 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
102
Item
No. Description Quantity Unit Unit Cost Total Cost
BACKING, SWALE, AND
BENEATH
INFRASTRUCTURE
INSTALLATION AREA TO
SUBBASE DESIGN GRADE
PER CONSTRUCTION
KEYNOTE NO. 11, 13, 15, 35,
AND 36 ON PLAN SHEETS 7
THROUGH 11.
9 SAWCUT THE EXISTING
P.C.C. CONCRETE
SIDEWALK FOR THE FULL
DEPTH OF THE P.C.C. PER
DEMOLITION KEYNOTE NO.
5 ON PLAN SHEETS 4
THROUGH 6.
10 LF $________ $___________
10 REMOVE AND DISPOSE OF
THE EXISTING P.C.C.
SIDEWALK PER
DEMOLITION KEYNOTE NO.
6 ON PLAN SHEETS 4
THROUGH 6.
200 SF $________ $___________
11 SAWCUT THE EXISTING
P.C.C. CURB AND GUTTER
FOR THE FULL DEPTH OF
THE P.C.C. CURB AND
GUTTER PER DEMOLITION
KEYNOTE NO. 7 ON PLAN
SHEETS 4 THROUGH 6.
2 LF $________ $___________
12 REMOVE AND DISPOSE OF
THE EXISTING P.C.C. CURB
AND GUTTER PER
DEMOLITION KEYNOTE NO.
8 ON PLAN SHEETS 4
THROUGH 6.
40 LF $________ $___________
13 REMOVE AND
TEMPORARILY STORE THE
EXISTING
BARRICADE/WOODEN
FENCE PER DEMOLITION
KEYNOTE NO. 9 ON PLAN
SHEETS 4 THROUGH 6.
730 LF $________ $___________
14 LOWER THE WATER VALVE
RISERS PRIOR TO PAVING
ACTIVITIES PER
DEMOLITION KEYNOTE NO.
10 ON PLAN SHEETS 4
7 EA $________ $___________
17.b
Packet Pg. 387 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
103
Item
No. Description Quantity Unit Unit Cost Total Cost
THROUGH 6. ADJUST THE
EXISTING WATER VALVE
RISERS TO FINISH GRADE
AFTER PAVING
OPERATIONS HAVE BEEN
COMPLETED PER
CONSTRUCTION KEYNOTE
NO. 9 ON PLAN SHEETS 7
THROUGH 11.
15 PROTECT THE EXISTING
SURVEY MONUMENT IN
PLACE PER DEMOLITION
KEYNOTE NO. 11 ON PLAN
SHEETS 4 THROUGH 6.
INSTALL NEW MONUMENT
WELL FRAME AND COVER
PER CONSTRUCTION
KEYNOTE NO. 10 ON PLAN
SHEETS 7 THROUGH 11.
1 EA $________ $___________
16 LOWER THE SANITARY
SEWER OR STORMWATER
MANHOLE FRAME AND
COVER PRIOR TO PAVING
ACTIVITIES PER
DEMOLITION KEYNOTE NO.
12 ON PLAN SHEETS 4
THROUGH 6. ADJUST THE
EXISTING MANHOLE
FRAME AND COVER TO
FINISH GRADE AFTER
PAVING OPERATIONS
HAVE BEEN COMPLETED
PER CONSTRUCTION
KEYNOTE NO. 7 ON PLAN
SHEETS 7 THROUGH 11.
12 EA $________ $___________
17 ADJUST THE FIRE
HYDRANT TO FINISH
GRADE PER DEMOLITION
KEYNOTE NO. 15 ON PLAN
SHEETS 4 THROUGH 6 AND
CONSTRUCTION KEYNOTE
NO. 30 ON PLAN SHEETS 7
THROUGH 11. FURNISH D.I.
BURY, SHEAR SPOOL,
HARDWARE AND OTHER
ANCILLARY ITEMS FOR
THE ADJUSTMENT OF THE
FIRE HYDRANT.
1 EA $________ $___________
17.b
Packet Pg. 388 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
104
Item
No. Description Quantity Unit Unit Cost Total Cost
18 SAWCUT THE EXISTING
P.C.C. DRIVEWAY TO THE
FULL DEPTH OF THE P.C.C.
DRIVEWAY PER
DEMOLITION KEYNOTE NO.
19 ON PLAN SHEETS 4
THROUGH 6.
17 LF $________ $___________
19 REMOVE AND DISPOSE OF
THE EXISTING P.C.C.
CONCRETE DRIVEWAY PER
DEMOLITION KEYNOTE NO.
20 ON PLAN SHEETS 4
THROUGH 6.
204 SF $________ $___________
20 EXISTING PIEZOMETER TO
BE ABANDONED PER
DEMOLITION KEYNOTE NO.
21 ON PLAN SHEETS 4
THROUGH 6.
1 EA $________ $___________
21 REMOVE AND DISPOSE OF
EXISTING CHAIN LINK
FENCE ALONG
CALTRANS/CITY LIMITS.
220 LF $________ $___________
22 INSTALL A.C. PAVEMENT
PER CONSTRUCTION
KEYNOTE NO. 1, 2, 14 AND
24 ON PLAN SHEETS 7
THROUGH 11.
5,000 TONS $________ $___________
23 INSTALL CLASS 2 BASE
MATERIAL PER
CONSTRUCTION KEYNOTE
NO. 1, 4, 6, 8, 14, 18, 24, 25, 27,
33, AND 34 ON PLAN
SHEETS 7 THROUGH 11.
19,720 TONS $________ $___________
24 INSTALL 2 INCH X 8 INCH
PRESSURE TREATED
BOARDS PER
CONSTRUCTION KEYNOTE
NO. 3 ON PLAN SHEETS 7
THROUGH 11.
3,090 LF $________ $___________
25 INSTALL 6 INCH P.C.C.
CURB AND GUTTER PER
CONSTRUCTION KEYNOTE
NO. 4 ON PLAN SHEETS 7
THROUGH 11.
1,300 LF $________ $___________
26 INSTALL 4 INCH P.C.C.
SIDEWALK PER
CONSTRUCTION KEYNOTE
5,600 SF $________ $___________
17.b
Packet Pg. 389 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
105
Item
No. Description Quantity Unit Unit Cost Total Cost
NO. 5 ON PLAN SHEETS 7
THROUGH 11.
27 INSTALL 4 INCHES OF
GRANULAR SAND
BENEATH THE P.C.C.
SIDEWALK PER
CONSTRUCTION KEYNOTE
NO. 5 ON PLAN SHEETS 7
THROUGH 11.
155 TONS $________ $___________
28 INSTALL P.C.C.
RESIDENTIAL DRIVEWAY
PER CITY OF EL CENTRO
STANDARD DETAIL EC-200
AND EC 262 PER
CONSTRUCTION KEYNOTE
NO. 6 ON PLAN SHEETS 7
THROUGH 11.
202 SF $________ $___________
29 INSTALL P.C.C. IID ACCESS
DRIVEWAY PER
CONSTRUCTION KEYNOTE
NO. 6 ON PLAN SHEETS 7
THROUGH 11 AND DETAIL
E ON PLAN SHEET 26.
285 SF $________ $___________
30 INSTALL P.C.C. HANDICAP
RAMP AND TRUNCATED
DOMES PER
CONSTRUCTION KEYNOTE
NO. 8 AND 16 ON PLAN
SHEETS 7 THROUGH 11.
4 EA $________ $___________
31 APPLY POLYMER
MODIFIED ASPHALT
RUBBER CRACK SEALANT
PER CONSTRUCTION
KEYNOTE NO. 17 ON PLAN
SHEETS 7 THROUGH 11.
ALL CRACKS ¼ INCH OR
GREATER SHALL BE AIR
PRESSURE-BLOWN FREE OF
DEBRIS AND THE STREET
SHALL BE SWEPT CLEAN
PRIOR TO THE
APPLICATION OF CRACK
SEALANT PER DEMOLITION
KEYNOTE NO. 17 ON PLAN
SHEETS 4 THROUGH 6.
500 LBS $________ $___________
17.b
Packet Pg. 390 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
106
Item
No. Description Quantity Unit Unit Cost Total Cost
32 APPLY TYPE II SLURRY
SEAL COAT PER
CONSTRUCTION KEYNOTE
NO. 17 AND 28 ON PLAN
SHEETS 7 THROUGH 11.
EXISTING WATER VALVES
AND OTHER UTILITIES
SHALL BE COVERED AND
PROTECTED PRIOR TO
SLURRY SEAL OPERATIONS
PER DEMOLITION
KEYNOTE NO. 18 ON PLAN
SHEETS 4 THROUGH 6.
22 TONS OF
DRY
AGGREGATE
$________ $___________
33 GRADE AND RESEED
LANDSCAPE AREA
MATCHING EXISTING
LANDSCAPE PER
CONSTRUCTION KEYNOTE
NO. 19 ON PLAN SHEETS 7
THROUGH 11.
210 SF $________ $___________
34 INSTALL PREVIOUSLY
REMOVED FENCE PER
CONSTRUCTION KEYNOTE
NO. 23 ON PLAN SHEETS 7
THROUGH 11.
730 LF $________ $___________
35 INSTALL 12-INCH THICK
P.C.C. SLAB PER
CONSTRUCTION KEYNOTE
NO. 33 ON PLAN SHEETS 7
THROUGH 11.
50 SF $________ $___________
36 SIGNAGE AND STRIPING
PER PLAN SHEETS 23
THROUGH 25.
1 LS $________ $___________
37 SIGNAGE AND STRIPING
NORTH OF PHASE I
ROADWAY IMPROVEMENT
LIMIT, INCLUDING WORK
WITHIN CALTRANS RIGHTOF-WAY PER PLAN SHEETS
33 THROUGH 36.
1 LS $________ $___________
38 INSTALL CONDUITS FOR
FUTURE TRAFFIC
SIGNALIZATION PER PHASE
II TRAFFIC SIGNAL PLANS.
1 LS $________ $___________
39 STORMWATER POLLUTION
PREVENTION PLAN AND
EROSION CONTROL BMPS
IMPLEMENTATION.
1 LS $________ $___________
17.b
Packet Pg. 391 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
107
Item
No. Description Quantity Unit Unit Cost Total Cost
INCLUDE QUALIFIED
SWPPP PRACTITIONER
(QSP) INSPECTION AND
REPORTING SERVICES.
40 TRAFFIC CONTROL 1 LS $________ $___________
41 TRAFFIC SIGNALIZATION
MODIFICATION 1 LS $________ $___________
42 CONSTRUCTION STAKING
AND CERTIFICATE OF
MONUMENT
PRESERVATION.
1 LS $________ $___________
43 GEOTECHNICAL
ENGINEERING TESTING
FOR QUALITY CONTROL
(QC) PER THE CITY OF EL
CENTRO'S QUALITY
ASSURANCE PLAN (QAP).
1 LS $________ $___________
Total Base Bid (consisting of the sum of items 1 through 43) is:
$________________________ (Amount of Total Bid written numerically as Dollars and Cents, in US Dollars)
$ _________________________________________________________________________________________ (Amount of Total Bid written in words as Dollars and Cents, in US Dollars) The above bid, submitted above by a qualified prospective bidder, both in numerical form and written in words, shall constitute the Total Bid for this proposed project. The prospective bidder is responsible to place the amount bid for each and every one of the above items 1 through 22. Following receipt of sealed bids, the City of El Centro shall numerically add the amounts bid for all items 1 through 22. The amount of the Total Bid written in words shall be interpreted as a confirmation of the intent of the prospective bidder in preparing the Total Bid. The numerical sum of all bid items 1 through 22 as derived by the City shall be considered the correct Total Bid, in case an addition error has been made by the prospective bidder. The above Total Base Bid (including Alternatives, if selected) shall be the basis on which the Lowest Responsible Bid shall be selected by the City of El Centro for the proposed project.
1.00 – The undersigned hereby acknowledges the receipt of the following addendum (a):
None______; No. 1______; No. 2______; No. 3______; No. 4 ______; No. 5______
2.00 – The undersign hereby certifies that this proposal/bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation.
3.00 – The undersigned hereby accepts on the behalf of his firm all provisions and requirements of the contract documents, including but not limited to those related to time of completion and liquidated damages.
4.00 – The undersigned hereby certifies that they are authorized representative of the firm on whose behalf this proposal/bid is submitted and that they are acting at the direction and with the required approval of said firm, which is identified as follows:
17.b
Packet Pg. 392 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
108
Name of firm:
Address of firm:
Telephone Number: ( ) Fax Number: ( )
Contractor’s License Number: Type:
Signed: Date:
END OF PROPOSAL/BID FORM
17.b
Packet Pg. 393 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I) 109
EXHIBIT 12-G
BIDDER’S LIST OF SUBCONTRACTORS (DBE and NON-DBE) - PART I The Bidder shall list below the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent (.005%) of the prime contractor's total bid. The Bidder shall also list below the portion of the work which will be done by each subcontractor under this Contract. The prime contractor shall list only one subcontractor for each portion of the WORK. If the Bidder does NOT intend to use ANY subcontractors, then state “NONE” in the first block.
The Bidder's attention is directed to the provisions of Paragraph entitled “Subcontract Limitations,” of the Supplementary General Conditions which sets forth the percent of the WORK to be performed with the Bidder’s own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.
You need to include the subcontractor’s registration status and number
17.b
Packet Pg. 394 Attachment: Phase I Specifications VOL.1 (1190 : Approval of Plans and Specs - Imperial Avenue Extension Phase I)
Amount
Subcontracted DIR Reg Number
A
A
A
A
A
A
A
A
I
I
I
I
I
I
I
I
I
Local Assistance Procedures Manual Exhibit 12-B
Bidder’s List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder’s List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-Works/ContractorRegistration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the project.
In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater).
FEDERAL PROJECT NUMBER:
Photocopy this form for additional firms.
Subcontractor Name & Location Line Item & Description Subcontract Percentage of Bid Item
Contractor License Number DBE
(Y/N) DBE Cert Number Annual Gross Receipts
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Age of Firm in
years
Distribution – Original: Local Agency File; Copy: DLAE w/Award Package