Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 529 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
PROJECT CONSTRUCTION OPERATIONS
Project Name Project CUP #
Provide pertinent information concerning the projects construction operations - include a plot plan (which may be a tract map, site map or topographic map) which identifies the boundaries of the project, existing roads (including but not limited to paved, unpaved road ways, highways and freeways), where new proposed roads will be constructed, where the staging areas will be located, easements, entry and exit points (include whether these entry points will be permanent or temporary), whether or not sensitive receptors are adjacent to the project (including but not limited to residential areas, schools, day cares, churches, hospitals, nursing facilities, commercial and/or retail), include the distance between the project and the sensitive receptors and any other information as to allow for the proper evaluation of dust generating point sources and their impact. (Rule 801, subsection F.2.c.2&5)
The following checklist is provided solely as a guide and is not meant to be all inclusive. During the Plot Plan review process the Air District may identify additional dust generating point sources. For those instances where additional sources, not listed, have been identified please list under other. (Rule 801 subsection F.2.c.2&5)
List all identified actual and potential sources of fugitive dust emissions Bulk material handling and storage areas.
Paved and unpaved access roads, haul roads, traffic areas, and equipment storage yards.
Exit points where carryout and trackout onto paved public roads may occur.
Water supply locations if water application will be used for controlling visible dust emissions.
Check or list the relative locations of sensitive receptors within ¼ mile of the project. (Rule 407, Nuisance) No sensitive receptors within ¼ mile of the project.
Residential areas, schools, day care, churches, hospitals, nursing facilities, commercial, retail, etc.
Freeways, roads, or traffic areas that may be affected by the dust generating activities.
Other list below.
Other list below.
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 530 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
DISTURBED SURFACE AREA
Report the total area of land surface to be disturbed, the daily throughput volume of earthmovement in cubic yards and the total area in acres of the entire project site. (Rule 801, subsection F.2.c.3&4) Total surface area to be disturbed Acres
Daily maximum throughput volume of earthmoving
Cubic Yards
Daily average throughput volume of earthmoving
Cubic Yards
Total area of project site Acres
Total disturbed areas left inactive for more than seven days Acres
EXPECTED CONTRUCTION START AND END DATES
Phase 1 End Date
Phase 1 Start Date
Phase 2 Start Date
Phase 2 End Date
IF CONSTRUCTION IS NOT PHASED SIMPLY INCLUDE THE START AND END DATES UNDER THE PHASE 1 OPTION
Phase 3 Start Date
Phase 3 End Date
Phase 4 Start Date
Phase 4 Start Date
Identify whether any other locations should be included with this plan that are involved with this project.
An example may include listing any site where materials will be imported from or exported to.
OTHER SITES
No other locations are included with this project
Location 1:
No Dust Control Plan Required Included with this plan Included with another plan Location 2:
No Dust Control Plan Required Included with this plan Included with another plan Location 3:
No Dust Control Plan Required Included with this plan Included with another plan
DUST GENERATING ACTIVITY DATES
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 531 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
MINIMUM REQUIREMENTS
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
Structural Demolition
No demolitions are planned for this project explain below.
Asbestos NESHAP notification has been submitted to the ARB and copy to the District.
Pre-Activity (Rule 801 subsection F.1.a)
Not applicable for this project explain below.
The site will be pre-watered and work will be phased to reduce the amount of disturbed surface area at any one time. (Complete section M-1 beginning with page 7)
Active Operations (Rule 801, subsection F.1.b)
Application of water or Chemical Stabilizers to earthmoving activities. (Complete sections M-1 and/or M-2) Construct & maintain wind barriers to limit visible dust emissions to 20%. (Complete section M-3) Temporary stabilization: areas unused for seven or more days (Rule 801 subsection F.1.c) Not applicable for this project explain below.
Vehicular access will be restricted and water or dust suppressants will be applied and maintained at all unvegetated areas. (Complete sections M-2 and/or section M-3) Date notification submitted
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 532 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Unpaved Access, Haul Roads, Traffic & Equipment Storage Areas (Rule 805) Not applicable for this project explain below.
Apply water or dust suppressants to unpaved haul and access roads. (Complete sections M-1 and/or M-2) Method of restricting unauthorized vehicle access. (Complete section M-3) Water or dust suppressants will be applied to vehicle traffic and equipment storage areas. (Complete sec M-1 and/or M-2) Establish vegetation on all previously disturbed areas .(Complete section M-3)
MINIMUM REQUIREMENTS CONTINUED
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
Outdoor Handling of Bulk Materials (Rule 802)
No bulk materials will be handled during this project explain below.
Water or dust suppressants will be applied when handling bulk materials. (Complete sections M-1 and/or M-2) Protection from wind erosion by sheltering or enclosing the operation and transfer line. (Complete section M-3) Outdoor Storage of Bulk Materials (Rule 802)
No bulk materials will be stored during this project explain below.
Water or dust suppressants will be applied to storage piles. (Complete sections M-1 and/or M-2) Storage piles will be covered with tarps, plastic or other suitable material and anchored in such a manner that prevents the cover from being removed by wind action. (Complete section M-3)
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 533 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Enhanced Measures: According to Regulation VIII stabilization must be met at all times. See Rule 801 subsection D.2 Cease dust generating activities when wind speeds exceed 25mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.)
Application of water or dust suppressants once per hour when wind speeds exceed 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.) Apply water to maintain 12% soil moisture content when wind speed exceeds 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.) Construct fences 3-5 feet high with 50% or less porosity in conjunction with water application or dust suppressant when wind speeds exceed 15mph. (Records of wind speeds and wind gusts must be maintained and provided to the APCD upon request.)
OTHER - If necessary attach separate sheet.
On-Site/Off Site Transporting of Bulk Materials
No bulk materials will be transported on the project site explain below.
Haul trucks will be covered with a tarp or other suitable cover. (Complete section M-5) All haul trucks will be loaded such that the freeboard is not less than six inches when transported across any paved public access road. (Complete section M-5)
Cargo compartments are maintained so that no spillage and loss of bulk material will occur from holes or other openings in the floor, side and/or tailgate. (Complete section M-5) Cargo compartment is to be cleaned and/or washed at delivery site after removal of Bulk Material. (Complete section M-5)
MINIMUM REQUIREMENTS CONTINUED
Project Name Project CUP #
This section describes the minimum requirements for limiting visible dust emissions from activities that cause fugitive dust emissions. Each category must have one requirement check marked. (Rule 801 section F) For Enhanced Measures check all that apply.
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 534 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
WATER APPLICATION
Complete this section if water application will be used as a control method for limiting visible dust emissions and stabilizing surface areas. Check and answer all sections that apply to this project. In addition, if there is no intention of applying water to any phase of the project explain below. (Rule 801 section F) NO WATER APPLICATION - EXPLAIN?
WATER APPLICATION SUPPLY - THE LOCATION OF EACH MUST BE IDENTIFED ON THE PLOT PLAN Fire hydrants
Number of hydrants available On-Site Off-Site
Approval granted by the owner or public agency to use their fire hydrants for this project.
Owner or Agency granting approval
Contact Name and phone number
Storage tanks Number of tanks
Wells Number of wells
Canal, River, Pond, Lake etc.
Approval granted by the owner or public agency to use their water source for this project Other explain
Capacity of each
Flow rate of each well
Owner or Agency granting approval
Contact Name and phone number
SECTION M-1
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 535 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
WATER APPLICATION CONTINUED
Complete this section if water application will be used as a control method for limiting visible dust emissions and stabilizing surface areas. Check and answer all sections that apply to this project. In addition, if there is no intention of applying water to any phase of the project explain above. (Rule 801 section F)
WATER APPLICATION EQUIPMENT: THE LOCATION OF EACH MUST BE IDENTIFED ON THE PLOT PLAN Sprinklers
Describe the activities that will utilize sprinklers
Minimum treated area Square Feet
Acres
Maximum treated area
Water Truck Other explain
Describe the activities that will utilize the equipment Number of application equipment to be used
Application equipment capacity
Application frequency must be once per day or more explain frequency below Hours of operation
Water application equipment is available to operate after normal working hours, on weekends and holidays Name of contact after hours Phone No.
Name of contact after hours Phone No.
Frequency
Square Feet
Acres
Frequency
SECTION M-1 CONTINUED
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 536 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
DUST SUPPRESSANT PRODUCTS
Complete this section if a dust suppressant product will be used. These materials include but are not limited to: hygroscopic suppressants (road salts), adhesives, petroleum emulsions, polymer emulsions and bituminous materials (road oils).
Not Applicable - The only control method will be the application of water (Complete section M-1) Application Area; Explain where the dust suppressant will be applied below Product (Manufacturer) Name
Name of contractor Phone No.
Explain the rate of application including the amount of gallons of undiluted material per mile or per acre below.
Utilizing the checklist below attach each of the following pieces of information that fully describes the product to be used. All information must be submitted with this plan.
Product Specifications. (MSDS, Product Safety Data Sheet, etc.) Manufacturer's Usage Instructions. (method, frequency and intensity of application) Environmental impacts and approvals or certificaitons related to the appropriate and safe use for ground application.
Explain the application frequency; type and number of equipment; capacity including the amount of gallons of undiluted material per mile or per acre below.
Check here if more than one dust suppressant will be utilized and include the necessary copies of this page with the information for each dust suppressant to be used.
SECTION M-2
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 537 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
OTHER DUST CONTROL METHODS
Check below all other types of dust control methods that will be employed at the construction site.
Physical barriers for restricting unauthorized vehicle access Fences Gates Posts Berms Concrete Barriers
Other explain below
Wind barriers describe below.
Re-establish vegetation for temporarily stabilizing previously disturbed surfaces explain below.
Apply Gravel- for the application of gravel identify where application will occur such as haul road, access roads, equipment storage yards (areas), vehicle traffic areas etc explain below.
Apply pavement - explain where paving will occur.
Other explain below.
SECTION M-3
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 538 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
TREATMENTS FOR PREVENTING TRACKOUT
Select the control devices that will be used for preventing trackout from occurring onto paved public roads. Trackout is any material that adheres to vehicle tires and is deposited onto a paved public road or the paved shoulder of a paved public road. Check all that apple to this project below.
Grizzly: Rails, pipes, or grates used to dislodge debris off of vehicles before exiting the site. Extends from the intersection with the paved public road surface for the full width of the unpaved exit surface for a distance of at least 25 feet. Describe below
Gravel Pad: A layer of washed gravel at least three (3) inches deep which extends from the intersection with the public paved road surface for the full width of the unpaved exit surface for a distance of at least 50 feet. Identify gravel size in inches, the pad width in feet, including the length and depth of the gravel below.
Paved Surface: Extends from the intersection with the paved public road surface for the full width of the unpaved access road for at least 50 feet to allow mud and dirt to drop off of vehicles before exiting the site.
Identify the width and length of the paved surface below in feet.
Mud and dirt deposits within an urban area shall be cleaned immediately when trackout or carryout extends a cumulative distance of 50 linear feet or more otherwise clean up must be at the end of the workday.
Wheel Washer: Uses water to dislodge debris from tires and vehicle undercarriage. If utilizing a wheel washer describe the location, type and operation of the wheel washer below.
Other - describe any other measure utilized to prevent trackout below.
SECTION M-4
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 539 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
TREATMENTS FOR PREVENTING CARRYOUT
Report the required treatments that will be used for preventing carryout from occurring on paved public roads. Carryout occurs when materials from emptied or loaded haul trucks, vehicles, or trailers fall onto a paved public road or paved shoulder of a paved public road. Check all that apply.
No haul trucks will be routinely entering or leaving the project site explain below.
Emptied Haul Trucks:
Interior cargo compartments will be cleaned before leaving the project site. Explain below how emptied haul truck will be washed and the source of the water supply.
Cargo compartment will be covered with a tarp or suitable cover before leaving the project site.
Loaded Haul Trucks:
Haul trucks will be loaded such that the freeboard is not less than six inches.
Other describe below.
Spillage or loss of materials from holes or other opening(s) in the cargo compartment will be prevented when material transported onto any paved public access road.
SECTION M-5
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 540 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) Project Name Project CUP #
Check and report below the methods and frequency for cleaning up carryout and trackout from the surface and paved shoulder of paved public roads. All material tracked or carried out onto paved road must be removed. Check all that apply.
The use of blower devices, or dry rotary brushers or brooms, for removal of carryout and trackout from paved public roads is not recommended.
The project is located in
An Urban Area
Minimum cleanup frequency will be at the end of the workday and removed immediately if carryout and trackout, extends beyond 50 feet.
Optional - Clean up Method
Manually sweeping and picking up.
Mechanical sweeping with a rotary brush or broom accompanied or preceded by water.
Describe types of equipment that will be used.
CLEANING UP CARRYOUT AND TRACKOUT
Identify the urban area by location, description etc. below.
Non Urban Area
At the end of the workday
Identify the non urban area by location, description etc. below.
SECTION M-6
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 541 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) I certify that all information contained herein and information submitted in the attachments to these documents are true and correct.
Print Name Title
Signature Date
Phone Number Fax Number
Cell Number
Records and/or any other supporting documents used for the demonstration of compliance must be maintained for two years and provided to the Air Pollution Control District upon request.
Project Name Project CUP #
RECORD KEEPING
CERTIFICATION
AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION
DUST CONTROL PLAN
SAMPLE FORMAT
150 S. 9th Street, El Centro, CA 92243
Ph. (442) 265-1800
REGULATION VIII - Rules 800-805
Fax (442) 265-1799 Is this plan an original or revision?
18.a
Packet Pg. 542 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 68 16. IMPERIAL IRRIGATION DISTRICT REQUIREMENTS
There will be a new Date Drain Underground Pipeline and other IID facilities to be installed by Imperial Irrigation District (IID) Water Department within the project excavation limits prior to the commencement of the construction activities of the City of El Centro South Imperial Avenue Improvement Project – Phase II.
As a drainage pipeline will be installed within the existing Date Drain open channel along South Imperial Avenue within the IID Easement, a securement of an encroachment permit for permanent and temporary (construction) is required. The City of El Centro has submitted the Encroachment Permit Application to IID during the design phase. Encroachment Permit Number XXX was issued to the City of El Centro by the Imperial Irrigation District (IID) to install new drainage pipeline into the existing Date Drain open channel.
The Contractor shall complete the street improvements after the IID completes the undergrounding of the Date Drain.
The City of El Centro forwarded the Imperial Irrigation District a fee to cover the Engineering Services, permit review fees, administration fees. The Contractor shall pay the IID inspections fees and construction costs to install underground conduits, power lines, and other ancillary facilities per the drawings and specifications prepared by the IID Power Division.
It shall be the responsibility of the Contractor to provide the Imperial Irrigation District a Hold Harmless/Indemnity Statement and Certificate of Liability Insurance naming the Imperial Irrigation District as an additional insured per the Imperial Irrigation District’s requirements. The Contractor shall also coordinate with the City of El Centro regarding any other requirements required by the Imperial Irrigation District. The Contractor shall comply with all provisions of the Imperial Irrigation District Encroachment Permit and include the cost of the provisions within his/her bid amount.
The Imperial Irrigation District Encroachment Permit, IID Design Plans and Specifications (IID Contractor’s Notes) follow:
SECTION CONTINUED WITH THE IMPERIAL IRRIGATION DISTRICT ENCROACHMENT PERMIT, PLANS AND SPECIFICATIONS.
18.a
Packet Pg. 543 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 69 17. TEMPORARY CONSTRUCTION EASEMENT
The Contractor shall coordinate with the owner of the private property located at the northeast corner of South Imperial Avenue and Danenberg Drive to secure a temporary construction easement. New sidewalk is to be constructed along the north side of Danenberg Drive between South Imperial Avenue and the west end of the existing Danenberg Drive roadway. Native shoulder backing installation after the installation of new sidewalk will encroach into the private property.
The Contractor shall submit a written communication record with the private property owner that the temporary construction easement was granted to the Contractor and the City of El Centro for the construction of new sidewalk and shoulder backing activities in accordance with the City of El Centro’s Temporary Construction Easement Securement Provisions.
Any damages to the private properties caused by the Contractor shall be repaired and restored to its original condition or better.
The Contractor shall coordinate with their subcontractors to complete the work simultaneously and/or consecutively in order to minimize the work duration within the private property.
Payment: Full compensation for coordinating, filing documentation/record and securing a temporary construction easement complying with the City of El Centro’s requirements shall be considered as included in the contract unit price paid per the lump sum price for “Mobilization” and no additional/separate compensation shall be provided.
18. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION Stormwater Pollution Prevention Plan shall conform to the provisions in Section 13,"Water Pollution Control," of the Standard Specifications. A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the project by the City of El Centro. The SWPPP is a part of the contract documents. The Contractor shall install the Best Management Practices (BMPs) as required in the SWPPP. The Contractor shall provide a Qualified SWPPP Practitioner (QSP) to complete establishing, monitoring, maintaining, and reporting for the Best Management Practices (BMPs) in accordance with the SWPPP.
19. TRAFFIC SIGNALIZATION MODIFICATION
The Contractor shall coordinate with the Caltrans representative(s) to adjust the timing of the new traffic signalization system for the permanent traffic movement configuration at the intersection of Wake Avenue and South Imperial Avenue prior to opening South Imperial Avenue – Phase II. Traffic signalization timing, detectors, cameras, electrical system, and all other components to have the signalization properly function shall be adjusted and modified per the Caltrans requirements. The new signalization system at the South Imperial Avenue and Wake Avenue Intersection shall be adjusted with the existing signalization system at the I-8 overpass to ensure smooth traffic flow. The cost associated with the examination of the signalization system, adjustments and modifications to the traffic signalization system, coordination with the Caltrans representative(s), and any other associated work required to have the signalization system fully functional at the I-8/South Imperial Avenue Interchange shall be included in the lump sum price paid for the “Traffic Signal Modification” Bid Item and no additional compensation shall be provided therefor.
20. COORDINATION BETWEEN PHASE I AND PHASE II CONTRACTORS A. Native Material Cut and Fill
During the design phase of Phase I and Phase II South Imperial Avenue Extension Projects, the new roadway was designed so that the cut and fill from the combined Phase I and Phase II Projects will be balanced. The Phase I Project Scope of Work requires a large amount of fill to establish the embankment and to tie in the I-8 Interchange Bridge and the South Imperial Avenue Roadway Extension. The Phase II
18.a
Packet Pg. 544 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 70 Project Scope of Work requires mostly cut. As the Phase I and Phase II Projects are scheduled to be constructed simultaneously, coordination between the Contractors for the Phase I and Phase II Projects will be required. The Phase II Project Contractor shall remove overgrown vegetation from the excavated native material. The removed and screened native material free of trash, tree roots, organic materials, and large rocks shall be transported to or near the intersection of Wake Avenue and South Imperial Avenue within the City of El Centro Right-of-Way. The exact location of the material delivery shall be determined by the City of El Centro’s representative during the construction phase. The Phase I Project Contractor shall utilize the native material delivered and stockpiled by the Phase II Contractor to establish the subbase design grade. The Phase I Project Contractor shall remove and dispose of excess native material.
B. Traffic Signalization at the South Imperial Avenue and Wake Avenue Intersection Phase II Project Scope of Work of the South Imperial Avenue Extension consists of the installation of traffic signalization at the intersection of Wake Avenue and South Imperial Avenue. The Phase I Contractor shall install conduits that are required by the Phase II Traffic Signalization Plan prior to paving and constructing the P.C.C. infrastructures including the corner ramps, sidewalk, and curb and gutter at the said intersection. The Phase I Contractor shall coordinate with the City of El Centro and the Phase II Contractor in order to avoid any conflicts with the signalization installation prior to constructing the roadway infrastructures.
21. CERTIFICATE OF COMPLIANCE VERIFICATION
Certificates of Compliance shall be submitted by the Contractor for selected construction items during the submittal phase in accordance with the governing agency’s(ies’) requirements and the Contract Documents.
Prior to installing the preapproved construction items by the Certificates of Compliance, the actual items delivered to the project site shall be inspected, verified and approved by the Engineer. The Contractor shall not install the construction items unless the Engineer satisfactorily complete the inspection and verify the delivered construction items conform with the batch numbers, lot numbers and any other product data indicated on the previously submitted Certificates of Compliance for the construction items.
22. CATEGORICAL EXEMPTION/CATEGORICAL EXCLUSION DETERMINATION FORM
CONDITIONS
In accordance with the Caltrans NEPA Determination for Federal-Aid Project Number STPL-5169(049) dated April 26, 2018 (included at the end of this section) the following conditions apply to this project and must be adhered to:
Air Quality
As part of the specifications for construction contracts, the Caltrans requirements relative to air quality impacts must be used on this project. The proposed action must conform to the following provisions in Section 14-9.02, “Air Pollution Control,” of the 2015 Standard Specifications:
Comply with air-pollution-control rules, regulations, ordinances, and statutes that apply to work performed under the Contract, including those provided in Government Code Section 11017 (Public Contract Code Section 10231).
Do not dispose of material by burning
It is recommended that the following measures be incorporated into the project to minimize the emission of fugitive dust, PM10, and PM2.5:
1. Standard Mitigation Measures for Construction Equipment Use alternative fueled or catalyst-equipped diesel-construction equipment, including all off-road and portable diesel-powered equipment.
18.a
Packet Pg. 545 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 71 Minimize idling time either by shutting equipment off when not in use of reduce the time idling to five minutes as a maximum.
Limit, to the extent feasible, the hours of operation of heavy-duty equipment and/or the amount of equipment in use.
Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set).
2. Enhanced Mitigation Measures for Construction Equipment Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing construction activity during the peak hour vehicular traffic on adjacent roadways. Implement activity management (e.g., rescheduled activities to reduce short-term impacts).
3. Standard Mitigation Measures for Fugitive PM10 Control All disturbed areas, including bulk material storage which is not being actively utilized, shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by using water, chemical stabilizers, dust suppressants, tarps, or other suitable material such as vegetative ground cover.
All on-site and off-site unpaved roads shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by paving, chemical stabilizers, dust suppressants, and/or watering.
All unpaved areas of one acre of more with 75 or more average vehicle trips per day shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emissions by paving, chemical stabilizers, dust suppressants, and/or watering. The transport of bulk material shall be completely covered, unless six inches of freeboard space from the top of the container is maintained with no spillage and loss of bulk material. In addition, the cargo compartment of all haul trucks is to be cleaned and/or washed at delivery site after removal of bulk material.
All track-out or carry-out shall be cleaned at the end of each workday or immediately when mud or dirt extends a cumulative distance of 50 linear feet or more onto a paved road within an urban area. Movement of bulk material handling or transfer shall be stabilized prior to handling or at points of transfer with the application of sufficient water, chemical stabilizers, or by sheltering or enclosing the operation and transfer line.
The construction of any new unpaved road is prohibited within any area with a population of 500 or more, unless the road meets the definition of a temporary unpaved road. Any temporary unpaved road shall be effectively stabilized, and visible emissions shall be limited to no greater than 20 percent opacity for dust emission by paving, chemical stabilizers, dust suppressants, and/or watering.
Noise
Caltrans Standard Specifications Section 14-8.02 includes noise control requirements that restrict construction noise (Caltrans 2015) and should be followed:
18.a
Packet Pg. 546 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 72 Construction noise levels shall not exceed 86 dB (A) Lmax at 50 feet from the job site activities between the hours of 9:00 p.m. to 6:00 a.m.
Biology
All vegetation removal shall take place between October 1 and December 31, outside the avian nesting season. A qualified biologist shall conduct a nesting bird survey prior to removal of vegetation removal is required during the avian nesting season (January 1 through September 30). If active nests are found, appropriate avoidance buffers would be established as determined by a qualified biologist based on the species involved, site conditions, and type of work to be conducted. No construction activities would occur within the buffer area until the nest is no longer active.
A worker environmental training program shall be prepared by a qualified biologist. Special-status bird species with the potential to occur on or adjacent to the PIA shall be identified in the worker training program. Instructions shall be provided on limiting construction activities to within the PIA. The worker training shall be conducted for construction foremen and workers a by a qualified biologist. The worker environmental training shall include the following:
1. Description of species
2. Biology of species
3. Wallet card with species picture/guidelines for protecting the species, and
4. Notification procedures if individual (dead, alive, or injured) is found on or near site.
A preconstruction survey shall be performed within 14 days prior to start of construction. A report detailing the preconstruction survey shall be submitted to the Caltrans.
1. If burrows are found within 100 meters of construction from October 16 to March 31; 200 meters of construction for construction from August 16 to October 15; and 500 meters of construction for construction occurring between April 1 and August 15th any occupied burrows shall be sheltered in place using hay bales or barricades and monitored daily during breeding season and weekly in the non-breeding season. The biologist shall have the authority to establish minimum distances to active nests and to stop work if owls are showing signs of distress. If sheltering in place is not feasible, passive relocation of the owls shall be required after consultation with CDFW and described here.
2. After consultation with CDFW, artificial burrows (minimum of 50 feet apart) shall be installed using the guidelines found in the Imperial Irrigation District Artificial Burrow Installation Manual or other applicable manuals unless suitable burrows are available in proximity.
3. After consultation with CDFW, owls shall be excluded by installation of one-way doors into the opening of the burrows. Burrows shall be scoped prior to excavation. One-way doors shall be left in place for 48 hours, if scoping indicates occupancy. Excavation shall be done using hand tools and refilled to prevent reoccupation. After a burrow is collapsed, the contractor shall immediately disk down the area or excavate the burrow by hand to prevent reoccupation.
4. Site monitoring shall occur prior to, during, and after owl exclusion. Documentation (i.e., pictures, note taking) shall be made and a report shall be prepared and sent to CDFW.
5. Visible markers shall be placed near burrows to ensure that equipment and machinery does not collapse burrows.
6. Lighting shall be limited to areas required for operations or safety, shall be directed on-site to avoid back scatter, and shall be shielded from public view to the extent practical. Lighting that is not required to be on during nighttime hours shall be controlled with sensors or switches operated such that lighting shall be on only when needed.
18.a
Packet Pg. 547 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 73 Payment: Full compensation for furnishing all labor, materials, tools, equipment, complying with the applicable environmental laws and regulations for the above mentioned conditions, preparing a nesting bird survey, conducting a worker environmental training, preparing a pre-construction survey, and for doing all the work involved in complying with the Categorical Exemption/Categorical Exclusion Forms conditions shall be considered as included in the contract unit price paid per the lump sum price for “Mobilization” and no additional/separate compensation shall be provided.
18.a
Packet Pg. 548 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 74 18.a
Packet Pg. 549 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 75 18.a
Packet Pg. 550 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 76 18.a
Packet Pg. 551 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 77 18.a
Packet Pg. 552 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 78 23. BUY AMERICA REQUIREMENTS REVISIONS
In accordance with the Caltrans Memorandum issued on December 30, 2013 with regard to the Buy America (BA) requirements as per the direction of the Federal Highway Administration (FHWA), the conditions indicated in the aforementioned memorandum apply to this project and the memorandum follows this specifications section.
18.a
Packet Pg. 553 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
76 18.a
Packet Pg. 554 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
77 18.a
Packet Pg. 555 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
78 18.a
Packet Pg. 556 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 82 24. PROJECT SIGNS
1. California requires a project identity sign for all construction projects in the State of California. At a minimum this sign must have the project name, the awarding agencies’ information, the funding agencies’ information. The project identity sign shall be installed at locations designated by the Construction Manager.
2. California requires a Contractor’s identity sign for all construction projects in the State of California.
At a minimum this sign must have the Contractor’s name, address, telephone number, State Contractor’s License number and an afterhour’s emergency telephone number for safety, police and fire emergencies. The Contractor’s identity sign shall be installed at locations designated by the Construction Manager.
3. California and Federal labor laws require employee notices and posters be provided at all project sites that employ workers. Federal labor laws for Public Works projects require the current Federal Wage Decisions to be posted and maintained at the project site for the duration of a construction project. California labor laws for Public Works projects require the current State Wage Decisions to be posted and maintained at the project site for the duration of a construction project. In addition there are EEO, OSHA and other required postings to be posted and maintained at the project site for the duration of the construction.
4. A clear Plexiglass plate is to be placed over the sign to protect the posters from the elements.
5. The Contractor is responsible for providing, installing and maintaining the project signs required by this section. The Project signs shall be submitted to the Construction Manager as a submittal document for review and approval. The Project signs are to be erected at the project site prior to commencement of any work activities. The Project signs are to remain posted for the entire duration of the project.
Schematic project signs follow this specification section.
18.a
Packet Pg. 557 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 83 18.a
Packet Pg. 558 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 84 END OF SPECIAL CONDITIONS
18.a
Packet Pg. 559 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 85 TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
1 GENERAL………………………………………………………………………………86
2 MOBILIZATION……………………………………………………………………….86
3 SUBBASE PREPARATION…………………………………………………………..86
4 SUBGRADE PREPARATION………………………………………………………..87
5 SAND……………………………………… …………………………………………87
6 CLASS 2 BASE……………………………………………………………………….87
7 P.C.C. CONCRETE…………………………………………………………………...88
8 HOT MIX ASPHALT……….…………………………………………………………89
9 TACK COAT (SS1H) APPLICATION………………………………………………89
10 STRIPING AND PAVEMENT MARKINGS………………………………………..90
11 ROCK SLOPE PROTECTION……………………………………………………….90
12 RSP FABRIC……………………………………………………………………….....91
13 MANHOLE/VALVE FRAMES AND COVERS……………………………………..93
14 STORMWATER INFRASTRUCTURE………………………………………………93
15 CEMENT SLURRY BACKFILL…………………………………………………….97
18.a
Packet Pg. 560 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 86 TECHNICAL SPECIFICATIONS
1. GENERAL
The Technical Specifications for this project shall be the State of California Department of Transportation Standard Specifications (latest edition) and the Standard Specifications for Public Works Construction, “The Greenbook” (SSPWC) for any items which are not specified in the Caltrans Standard Specifications. If there is any discrepancy between the Caltrans Standard Specifications and the Greenbook, the most stringent requirement shall prevail.
2. MOBILIZATION
A. Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the Project site for all other work and operations that must be performed or costs incurred before beginning work on the various Contract items on the Project site.
B. Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:
1. Obtaining all permits, licenses, insurance, and bonds (performance and payment bonds). Providing copies to the Construction Manager/Resident Engineer;
2. Moving onto the Jobsite all of Contractor’s plant, material and equipment as required;
3. Developing construction water supply;
4. Providing restroom facilities – two (2) gender-neutral units;
5. Providing potable water facilities as specified. This includes a means by which all on site Contractor, Subcontractor or supplier personnel can wash their hands with soap. It also includes providing potable drinking water to the construction personnel at the project site;
6. Pot-holing to verify the locations of the existing utilities within the limits of construction;
7. Submitting all required Subcontractor insurance certificates, bonds and contract agreements with subcontractors;
8. Paying Taxes and Freight;
9. Posting all CAL/OSHA required notices and establishment of safety programs;
10. Having the Contractor’s representative at the Jobsite full time;
11. Furnishing of Construction Schedule, Contract Price Breakdown (Schedule of Values), Submittal Documents and Submittal Schedules;
12. Preparing and providing As-Built drawings;
13. Attending Project Meetings;
14. Complying with the Air Pollution Control District Permit Requirements and paying the associated Fees;
15. Complying with the IID Encroachment Permit requirements;
16. Complying with the Environmental Mitigation Measurements and Requirements;
17. Providing Project Signs (Contractor’s Identity Sign and Project Identity Sign);
18. Coordinating with utility purveyors, complying with their requirements and paying any fees;
19. Securing a temporary construction easement and paying any fees;
20. Complying with the funding source requirements, filling out the required forms (Caltrans LAPM forms), and submitting the required forms in timely manner; and
21. Paying other miscellaneous fees.
All costs incurred for the mobilization and the associated work shall be included in the Bid Item for the Mobilization cost and no additional compensation shall be provided therefor.
3. SUBBASE PREPARATION
18.a
Packet Pg. 561 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 87 The native material beneath P.C.C. concrete and asphalt concrete infrastructure including but not limited to P.C.C. sidewalk, driveway, curb and gutter, handicap ramp, barrier curb and A.C. pavement shall be excavated to 0.05 feet of design subbase grade. The design subbase grade shall be field verified and approved by the Construction Manager prior to the placement of granular sand fill, or Class 2 Base. The Construction Manager shall determine the number and location of points to check for the subbase grade elevation compliance. Prior to the Construction Manager’s inspection of the subbase grade the Contractor shall establish bluetop hubs (stakes set to design subbase grade) 25 feet on center along street sections. The stakes shall be established at the edge of pavement, centerline and hinge points/grade breaks across the street sections. Bluetop stakes shall also be placed at 25 foot stations along barrier curb lines.
4. SUBGRADE PREPARATION
The Class 2 Base beneath A.C. pavement and concrete infrastructure shall be placed to within 0.02 feet of design subgrade prior to the placement of A.C. pavement or P.C.C. concrete. The Construction Manager shall field verify the subbase elevations in the field prior to the placement of Class 2 Base material.
Placement of P.C.C. concrete or A.C. pavement shall not be allowed until the Construction Manager has approved the subgrade design grade. Prior to the Construction Manager’s inspection of the subgrade, the Contractor shall establish bluetop hubs (stakes set to design subgrade) 25 feet on center along street sections. The stakes shall be established at the edge of pavement, centerline and hinge points/grade breaks across the street sections. Bluetop stakes shall also be placed at 25 foot stations along barrier curb and curb and gutter lines.
5. SAND
Clean granular sand free of clay, shale and deleterious material shall be delivered to the site and placed as noted on the plans. Sand shall be compacted to 90 percent of maximum density at optimum water content per ASTM D-1557 unless otherwise noted on the plans. The material shall conform to a sand equivalent of 30 or greater. The maximum amount of material passing the number 200 sieve shall be 6 percent. The sand shall conform to the following gradation percentages:
SIEVE SIZE PERCENT PASSING
3/8” 100
NO. 4 98-90
NO. 8 90-75
NO. 10 75-60
NO. 16 60-50
NO. 30 50-38
NO. 40 38-29
NO. 50 29-19
NO. 100 19-7
NO. 200 6-0
The Contractor shall supply a five gallon sample of sand material to the material testing laboratory within four (4) days after the Notice to Proceed is issued. The gradation, sand equivalent and maximum density of the sand material shall be determined. The test results shall be forwarded to the Construction Manager. The cost of testing shall be incurred by the Contractor. The gradation of the granular sand shall be determined and the test results forwarded to the Construction Manager prior to the delivery of the granular sand material to the construction site. Prior to the placement of sand the native subbase grade shall be checked and approved by the Construction Manager.
6. CLASS 2 BASE
The Class 2 Base material shall conform to Caltrans Section 26, latest edition, for ¾-inch maximum base material. The gradation requirements are as follows:
18.a
Packet Pg. 562 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 88 SIZE PERCENT PASSING
1 IN/25.00MM 100
¾ IN/19.00MM 87-100
#4/4.75MM 30-65
#30/600MM 5-35
#200/75.00MM 0-12
The sand equivalent shall be 25 or greater. An angular aggregate is to be used. Class 2 Base material shall be compacted to 95 percent of maximum density according to ASTM D-1557, unless otherwise noted on the plans or details. The tolerance for the Class 2 Base between design subgrade elevation and actual subgrade elevation as constructed in the field shall be plus or minus 0.02 feet as referenced from the design subgrade.
Prior to the placement of Class 2 Base the native subbase grade shall be checked and approved by the Construction Manager. The native subbase grade shall be within plus or minus 0.05 feet of subbase design grade prior to the placement of Class 2 Base.
The Contractor shall supply a five gallon sample of the Class 2 Base to the material testing laboratory within four (4) days of the Notice to Proceed. The material shall be delivered to the testing laboratory to determine the maximum density, gradation, R-value, sand equivalent and durability index of the Class 2 Base. A copy of the test results shall be forwarded to the Construction Manager by the geotechnical consultant for review.
The gradation of the Class 2 Base shall be determined and the test results forwarded to the Construction Manager for approval prior to the delivery of the Class 2 Base material to the construction site. Class 2 Base utilizing recycled materials shall not be allowed.
7. P.C.C. CONCRETE
P.C.C. shall meet section 90-2 minor concrete of the latest Caltrans standard specifications.
P.C.C. concrete, utilized for but not limited to, curb and gutter, barrier curb, spandrels, cross-gutter, valley gutter, ribbon gutters, residential and commercial driveways, sidewalks and all other concrete infrastructure shall contain a minimum of 7 sacks of cement per cubic yard of concrete and attain 5,000 p.s.i. compressive strength after 28 days curing unless stated otherwise on the plans. The P.C.C. shall contain 1 ½ lbs of polypropylene fiber per cubic yard. A concrete mix design is to be submitted to the Construction Manager/Resident Engineer for approval.
Formwork utilized for construction shall be new or in good condition. The formwork shall be true to line and grade. The vertical flowline elevation tolerance shall be +/- 0.02 feet for design grade for slopes of
1.0% or greater, +/- 0.01 for design grade for slopes less than 1.0%. Concrete "curb machines" shall not be allowed for curb and gutter and ribbon gutters designed at a slope of 1 percent or less.
The Contractor shall notify the Construction Manager/Resident Engineer 72 hours prior to the required inspection. Prior to the placement of concrete, the subgrade depth shall be inspected to ensure that the full depth of concrete, as noted on the plans, is attained. Excess fill material shall be removed at the request of the Construction Manager/Resident Engineer. Compaction tests on the subgrade shall have achieved the density, at moisture content, requirements specified. The Construction Manager/Resident Engineer shall then allow the placement of concrete. The form boards shall be checked for the proper elevation.
The Construction Manager/Resident Engineer shall check the formwork for line / grade and approve prior to the placement of concrete.
Installation of curb and gutter, valley gutter and cross-gutters shall begin at the lowest elevation and proceed uphill.
A total of one (1) set of cylinders and one (1) slump test shall be required for every 50 cubic yards of concrete, except that a minimum of one (1) set of cylinders and slump test shall be required each day twenty
18.a
Packet Pg. 563 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 89 (20) or more yards of concrete are placed at a project site. The maximum allowable slump shall be 4 inches.
A set of cylinders shall be composed of three (3) cylinders. The first cylinder of a set shall be tested after seven (7) days curing. The second cylinder of a set shall be tested after 28 days curing. The third cylinder shall be held in reserve and tested if directed by the construction manager. The test results will be forwarded to the Construction Manager/Resident Engineer for review and approval. The Construction Manager shall receive a concrete vendor slip for each truck load of concrete delivered to the project site.
The concrete shall be screeded and floated. All edges shall be struck with a concrete edger. Weakened plane joints shall be established at right angles to the sidewalk edge as illustrated on the Improvement Plans. Weakened plane joints shall be placed every 8 lineal feet for ribbon gutter, cross gutter and valley gutter construction unless otherwise illustrated on the Plans. The weakened plane joints shall be 3/8 inch in width and 3/4 inch in depth. Expansion joints shall be placed every 64 feet along curb and gutter, barrier curb, valley gutter and sidewalk construction unless otherwise illustrated on the Improvement Plans.
Expansion joints consisting of 1/2 inch thick fiberboard material shall be placed across the full section of the P.C.C. sidewalk every 64 lineal feet, or as required by the Improvement Plans. After the concrete surface has been floated and cured adequately, it shall receive a double trowel finish. The troweling shall be conducted by hand with a steel trowel. The surface of the concrete shall receive a light broom finish after the surface is double troweled. The surface of the concrete shall be smooth and true to grade.
Tolerance for the concrete surface shall be 0.01 feet in 10 lineal feet with maximum high and low variance not occurring in less than 20 feet.
The Contractor shall maintain the concrete surface moist or wet for a 24-hour period after the concrete is placed and finished troweled. Placement of burlap bags or white polyethylene concrete curing blanket on the concrete surface and a continuous application of water over the concrete surface will be required for a 24-hour period. For ambient temperatures below 90-degrees Fahrenheit, a resin based, white pigmented curing compound may be used in lieu of keeping the concrete surface moist.
To minimize vandalism of non-cured concrete surfaces, the Contractor shall plan the work so that no concrete is placed after 12:00 p.m (noon), unless otherwise kept vigilant by the Contractor and approved by the Construction Manager/Resident Engineer. The Contractor is to barricade and protect placed concrete from all damages, marks, mars, and/or graffiti. Any concrete surface damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the engineer at the Contractor’s expense.
8. HOT MIX ASPHALT
The asphalt concrete mix shall meet Section 39 of the latest Caltrans Standard Specifications and the following requirements:
Aggregate base shall be 3/4-inch maximum, medium.
Asphalt binder shall be PG 70-10 in accordance with the approved hot mix design.
The asphalt concrete shall be Type “A” as set forth in the state of California, Department of Transportation, Standard Specifications, Section 39, latest edition.
The contractor shall submit an approved, signed, and verified job mix formula (JMF) on Caltrans Form CEM-3513 to the City and Caltrans during the submittal phase for approval, 15 days prior to the beginning of the work.
9. TACK COAT (SS1H) APPLICATION
Tack coat (SS1H) application shall be in accordance with Section 39-2.01C(3)(f) of the latest Caltrans Standard Specifications.
18.a
Packet Pg. 564 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 90 The tack coat shall be applied to the existing pavement surface, between HMA layers, and to vertical surfaces of curbs, gutters, and construction joints per the residual rates shown in Section 39-2.01C(3)(f).
A similar tack coat shall be applied to the surface of any course if the surface is such that a satisfactory bond cannot be obtained between it and a succeeding course.
The contact surfaces of all cold pavement joints, curbs, gutters, manholes, and the like shall be painted with either SS-1h emulsified asphalt or PG 64-10 paving asphalt per the application rate, as specified in the Caltrans Standard Specifications Section 39-1.09C, immediately before the adjoining asphalt concrete is placed.
Full compensation for furnishing all labor, materials, tools, and equipment and for doing all the work involved in tack coat application shall be considered as included in the contract unit price paid per the succeeding course of pavement installed immediately after the application of tack coat and no additional/separate compensation shall be provided for tack coat application.
10. STRIPING AND PAVEMENT MARKINGS
Traffic stripes and pavement markings shall conform to Section 84, “Markings” of the latest Caltrans Standard Specifications, except that Section 84-2.03c(2)(c) sprayable thermoplastic will not be allowed.
Pavement markings to be installed/applied in accordance with the locations and requirements illustrated on the striping plans shall be thermoplastic.
All the painted traffic stripes shall be applied in three-coats unless thermoplastic is used.
Existing or conflicting striping shall be removed as specified on the plans by hydroblasting or other abrasive mean just enough to remove it and avoid to create a recessed surface. The surface where the stripes and markings were removed shall be covered with fog seal completely. In the case of the pavement marking removal, the fog sealed surface shall be squared to the outer limits of the marking and shall be covered completely.
Striping and pavement markings shall not be applied before 14 days of fog seal or asphalt concrete placement. Surface cleaning and preparation shall be performed with mechanical wire brushing according to Section 84-2.03b Surface Preparation. Striping and pavement markings installation and removal shall be paid at the contract lump sum for the “Signage and Striping” bid item. Work shall be completed as shown on the Striping Plans and in accordance with Section 84 of the 2018 Caltrans Standard Specifications. The respective contract lump sum price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals for doing all the work, including, but not limited to, the following:
Removal and placement of painted lines, markings, and stenciling. Fog seal.
Protection of the existing stripes and markers.
Temporary pavement markings prior to opening the roadway. Surface cleaning and preparation.
Temporary tabs. (installed in between final asphalt concrete placement and permanent striping).
Apply 3 – coats on all striping.
All pavement markings shall be thermoplastic.
Traffic control plan preparation and implementation if different from the traffic control plan included in the improvement plans or if the roadway opens prior to the application of striping and pavement markings
Complete in place, as shown on the plans and as specified herein.
11. ROCK SLOPE PROTECTION
18.a
Packet Pg. 565 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 91 Rock Slope Protection shall conform to the provisions in Section 72-4, "Small-Rock Slope Protection," of the 2018 Caltrans Standard Specifications as inserted in this section. Rock Gradation for 7-inch-Thick Layer shall apply.
72-4 SMALL-ROCK SLOPE PROTECTION
72-4.01 GENERAL
Section 72-4 includes specifications for constructing small-rock slope protection. 72-4.02 MATERIALS
Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these.
Comply with the gradation requirements shown in the following table:
Rock Gradation for 7-inch-Thick Layer
Sieve size Percentage passing
5 inch 100
4 inch 90–100
3 inch 25–40
2 inch 0–10
Granular material must contain at least 90 percent crushed particles when tested under California Test 205. 72-4.03 CONSTRUCTION
Local surface irregularities of the small-rock slope protection must not vary from the planned slope by more than 2 inches as measured at right angles to the slope.
Small rocks may be placed by dumping and may be spread by bulldozers or other suitable equipment.
During spreading, do not crack the rock.
72-4.04 PAYMENT
The payment quantity for small-rock slope protection is the volume determined from the dimensions shown or ordered.
12. RSP FABRIC
Rock Slope Protection Fabric shall be placed per Sections 72 and 96-1.01 of the 2018 Caltrans Standard Specifications as inserted in this section. RSP Fabric Class shall be 8. 72-1 GENERAL
72-1.01 GENERAL
Section 72-1 includes general specifications for constructing slope protection. 72-1.02 MATERIALS
Construct slope protection or slope paving using minor concrete. Unless otherwise specified, fabric must be Class 8 RSP fabric.
18.a
Packet Pg. 566 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 92 72-1.03 CONSTRUCTION
Earthwork must comply with section 19.
If placement of fabric is required, place the fabric before placing slope protection, slope paving, and gabions.
Before placing the fabric, the surface of the slope must be free of loose or extraneous material and sharp objects that may damage the fabric.
Handle and place the fabric under manufacturer's instructions. Place the fabric loosely on the slope such that it conforms to the surface without damage to the fabric when the cover material is placed.
Join the edges of the fabric with either overlapped joints or stitched seams.
If the fabric is joined with overlapped joints, the adjacent borders of the fabric must be overlapped by at least 24 inches. Overlap in the same direction that the cover material is placed.
If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Use the size and composition of yarn that is recommended by the fabric manufacturer. Use 5 to 7 stitches per inch of seam. The strength of a stitched seam must be the same as that specified for the fabric, except if the stitched seams are oriented up and down a slope, the strength may be reduced to a value that it is at least 80 percent of that specified for the fabric.
Do not operate equipment or drive vehicles directly on the fabric.
If the fabric is damaged and the Engineer determines that it cannot be repaired, replace the fabric.
If the Engineer determines that the fabric can be repaired, then repair it by covering the damaged area with new fabric. If the repair is made using overlapped joints, the overlap must be at least 3 feet. 72-1.04 PAYMENT
The Owner does not pay for additional fabric used for overlaps.
Payment for rock slope protection fabric is not included in the payment for rock slope protection. 96-1.02I Rock Slope Protection Fabric
RSP fabric must be a permeable, nonwoven, needle-punched geotextile. The fabric must be manufactured from one of the following:
1. Polyester
2. Polypropylene
3. Combined polyester and polypropylene
Polymers must be either virgin compounds or clean reworked material. Do not subject virgin compounds to use or processing other than required for initial manufacture. Clean reworked material must be previously processed material from the processor's own production that has been reground, pelletized, or solvated. The fabric must not contain more than 20 percent of clean reworked material by weight. Do not use recycled materials from either post-consumer or post-industrial sources.
RSP fabric must comply with the requirements shown in the following table:
RSP Fabric
Quality characteristic Test method Requirement
Class 8 Class 10
Mass,(min, oz/sq yd) ASTM 7.5 9.5
Grab breaking load, 1 inch grip in each direction, (min, lb) ASTM D4632
200 250
Apparent elongation in each direction, (min, percent) ASTM D4632
50 50
Permittivity, (min, sec-1) ASTM
D4491
1.0 0.70
18.a
Packet Pg. 567 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 93 Apparent opening size, (min and max, US Standard sieve size) ASTM
D4751
70–100 70–100
UV resistance, retained grab breaking load, 500 hours, (min, percent) ASTM
D4355
70 70
13. MANHOLE/VALVE FRAMES AND COVERS
All manhole frames and covers, valve boxes and lids, and other similar existing utilities shall be raised to the grade of the finished pavement surface by the Contractor, in accordance with the utility owner’s requirements for each utility to be adjusted. Manhole frames and covers, and similar utility covers shall be lowered a minimum of 3 inches below the design pavement surface prior to the installation of A.C. pavement. Manhole frames and covers and other lids shall be raised after paving operations have occurred. 8-inch wide, 8-inch deep concrete collars shall be poured concentric with the outside of valve extension risers 3/8 inch below the finish pavement surface. A one (1) foot wide, one (1) foot deep concrete collar shall be poured concentric with the outside of all manhole frames and covers 3/8 inch below the surface of the pavement. Manhole frames and covers shall be raised with concrete grade rings 3/8 inch below the new street pavement surface elevation. The manhole frame and covers and valve extension risers and covers shall be raised 3/8 inch below the pavement grade after paving operations are complete.
Payment: If required by the governing utility owner, adjustment of the manhole frames and covers, valve boxes and lids, and other similar existing utilities in accordance with the governing utility agency’s requirements shall be considered inclusive of the unit price paid for asphalt pavement payment and no additional/separate compensation shall be provided to the Contractor unless a bid item for the item to be adjusted is included. The numbers and sizes of the utility frame and cover to be adjusted shall be verified by the Contractor and the governing utility owners.
14. STORMWATER INFRASTRUCTURE
A. PIPE INSTALLATION
This section covers furnishing all labor, supervision, materials, and equipment and performing all operations necessary to furnish and install the piping and fittings. All pipe and fittings, and accessories furnished by the Contractor shall be new material free from rust or corrosion. All piping and fittings shall be cleaned on the inside when installed and the Contractor shall take all necessary precautions to ensure that the lines are kept free of any foreign matter and dirt until the work is completed. All pipes shall be carefully placed and supported at the proper lines and grades as shown on the drawings. Piping runs shown on the drawings shall be followed as closely as possible except for minor adjustments to avoid other piping or structural features. If major relocations are required, they shall be approved by the Construction Manager/Resident Engineer. The bedding shall be defined as that material supporting, surrounding, and extending to one foot above the top of the pipe. If soft, spongy, unstable, or similar other material is encountered upon which the bedding material or pipe is to be placed, this unsuitable material shall be removed to a depth ordered by the City Engineer and replaced with bedding material suitably densified. Bedding material shall first be placed so that the pipe is supported for the full length of the barrel with full bearing on the bottom segment of the pipe. Hunching of the pipe shall not be allowed. Pipe will be carefully inspected in the field before and after laying. If any cause for rejection is discovered in a pipe after it has been laid, it shall be subject to rejection. Any corrective work shall be approved by the Construction Manager/Resident Engineer.
Pipe shall be laid true to line and grade with uniform bearing under the full length of the barrel of the pipe. Suitable excavation shall be made to receive the bell or collar which shall not bear upon the subgrade or bedding. Any pipe which is not in true alignment or shows any undue settlement after laying shall be taken up and relaid at the Contractor's expense.
18.a
Packet Pg. 568 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 94 Pipe shall be laid upgrade with the socket ends of the pipe upgrade unless otherwise authorized by the Construction Manager/Resident Engineer. Pipe sections shall be laid and joined in such a manner that the offset of the inside of the pipe at any joint will be held to a minimum at the invert. The maximum horizontal offset at the invert of the pipe shall be 1% of the inside diameter of the pipe or 0.02 feet, whichever is smaller. The vertical grade shall be +/- 0.02 feet of the design invert. In joining socket pipe, the spigot of each pipe shall be so seated in the socket of the adjacent pipe as to give a uniform annular space all around the pipe in the socket. Unavoidable offsets shall be distributed around the circumference of the pipe in such a manner that the minimum offset occurs at the invert. At the close of work each day, or whenever the work ceases for any reason, the end of the pipe shall be securely closed.
The width of the trench depends on the pipe diameter, backfill material, and the method of compaction.
Trenches that are too narrow will not allow for proper pipe installation, whereas trenches that are overly wide are unnecessarily costly. As a practical matter, standard bucket sizes may also factor into the decision.
Minimum trench widths shall conform to the below table.
MINIMUM TRENCH WIDTHS
Pipe Diameter, in. (mm) Minimum Trench, in.
(m)
4-8 (100-200) *
10 (250) 24 (0.6)
12 (300) 28 (0.7)
15 (375) 35 (0.9)
18 (450) 43 (1.1)
24 (600) 56 (1.4)
30 (750) 60 (1.5)
36 (900) 65 (1.7)
42 (1050) 84 (2.1)
48 (1200) 91 (2.3)
54 (1350) 97 (2.5)
60 (1500) 103 (2.6)
*Usually dependent on the smallest bucket size
available
These minimum trench widths are necessary for suitable in situ soils. These widths generally allow for backfill material to flow on either side of the pipe and permit many types of compaction equipment. If the width is not sufficiently wide for the materials and methods proposed, a wider trench allowing for proper installation should be constructed.
B. SHORING AND SHEETING
The Contractor shall do such trench bracing, sheathing, or shoring necessary to perform and protect the excavation as required for safety and conformance to governing laws. The bracing, sheathing, or shoring shall not be removed in one operation but shall be done in successive stages to prevent overloading of the pipe during backfilling operations. All shoring and sheeting deemed necessary to protect the excavation and to safeguard employees, shall be installed.
C. OPEN TRENCH
Except where otherwise noted in the special provisions, or approved in writing by the Construction Manager/Resident Engineer, the maximum length of open trench, where the construction is in any stage of completion (excavation, pipe laying or backfilling), shall not exceed 1,320 feet in the aggregate area of
18.a
Packet Pg. 569 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 95 a street at any one location.
Any excavated area shall be considered open trench until the trench backfill has been placed to subbase level, the level of the bottom of the class 2 base. With the approval of the Construction Manager/Resident Engineer, pipe laying may be carried on at more than one separate location, the restrictions on open trench applying to each location. Trenches across streets shall be completely backfilled as soon as possible after pipe laying.
Substantial steel plates with adequate trench bracing shall be used to bridge across trenches at street crossings where trench backfill and temporary patches have not been completed during regular work hours. Safe and convenient passage for pedestrians shall be provided. The Construction Manager/Resident Engineer may designate a passage to be provided at any point deemed necessary.
Access to hospitals, fire stations, schools, post offices, public facilities and fire hydrants shall be maintained at all times.
D. PROTECTION OF EXISTING UTILITIES
1) UTILITIES: Unless otherwise illustrated on the plans or stated in the specifications, all utilities, both underground and overhead, shall be maintained in continuous service throughout the entire contract period. the Contractor shall be responsible and liable for any damages to or interruption of service caused by the construction.
If the Contractor desires to simplify his operation by temporarily or permanently relocating or shutting down any utility or appurtenance, the Contractor shall make the necessary arrangements and agreements with the Utility Purveyor and shall be completely responsible for all costs concerned with the relocation or shutdown and reconstruction. All property shall be reconstructed in its original or new location as soon as possible and to a condition at least as good as its previous condition. This period of relocation or shutdown and reconstruction shall be subject to inspection and approval by both the Construction Manager/Resident Engineer and the Utility Purveyor.
The Contractor shall be entirely responsible for safeguarding and maintaining all conflicting utilities that are illustrated on the plans. This includes overhead wires and cables and their supporting poles whether they are inside or outside of the open trench. If, in the course of work, a conflicting utility line that was not illustrated on the plans is discovered, the Contractor shall either negotiate with the Utility Purveyor for relocation, relocate the utility or change the alignment and grade of the trench.
2) BUILDING, FOUNDATIONS AND STRUCTURES: where trenches are located adjacent to buildings, foundations, and structures, the Contractor shall take all necessary precautions against damage to them. The Contractor shall be liable for any damage caused by the construction.
Except where authorized in the special provisions or in writing by the City Engineer, water settling of backfill material in trenches adjacent to structures will not be permitted. 3) ELECTRONIC, TELEPHONIC, TELEGRAPHIC, ELECTRICAL, OIL, AND GAS LINES: These underground facilities shall be adequately supported by the Contractor. Support for plastic pipe shall be continuous along the bottom of the pipe. Support for metal pipe and electrical conduit may be continuous or nylon webbing may be used for suspension at no greater than ten-foot (10’) intervals.
The Contractor shall avoid damaging the plastic pipe, pipe ways, or conduits during trench backfilling and during foundation and bedding placement.
E. COMPACTION METHODS
Backfill material shall be compacted with hand and/or mechanical work methods using equipment such as
18.a
Packet Pg. 570 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 96 roller, pneumatic tamps, hydro-hammers, or other approved devices which secure uniform and required density without injury to the pipe or related structures.
Water consolidation by jetting or flooding is not acceptable as a soil consolidation method unless authorized in the technical specification or approved by the Construction Manager/Resident Engineer.
F. RIGHTS-OF-WAY BELONGING TO OTHERS
Where the permit of a governing agency sets forth requirements for compaction more stringent than those stated herein, the Contractor shall adhere to the more stringent requirements.
G. LEAK TESTING FOR STORMWATER MANHOLES/VAULTS
The Contractor shall leak test 100% of the stormwater manholes/vaults installed for this project.
The Contractor shall test all manholes/vaults using the following test procedure:
The Contractor shall fill the manholes/vaults with water and allow the interior surfaces of the manholes/vaults to soak for four (4) hours. The leak test shall then commence. Water tightness testing shall consist of filling the manholes/vaults with water to an established level. The Contractor shall ensure that the drop in water level does not exceed 0.001 of the total manhole/vault volume in one (1) hour.
H. ADDITIONAL TESTING
The Contractor shall perform deflection testing for 100% of stormwater lines to ensure that the installation meets or exceeds the manufacturer’s recommendations.
The Contractor shall perform deflection testing on the system as directed by the Construction Manager/Resident Engineer. The deflection testing shall be accomplished by mandreling the pipeline.
Any part of the installation, which shows deflection in excess of 5% of the average inside diameter per ASTM D3034 for PVC pipe, shall be corrected.
After acceptance but prior to the termination of the warranty period, the City of El Centro may test the long-term deflection of the stormwater pipeline. If the City of El Centro determines that the deflection has exceeded 7 ½% of the average inside diameter, that portion of the installation shall be corrected by the Contractor at no cost to the City of El Centro.
The Contractor shall perform a watertight field performance test on 100 % of the stormwater pipeline installed. The watertight field performance test shall be accomplished after the deflection testing of the stormwater pipeline is accomplished.
Stormwater lines shall be subject to acceptance testing after backfilling has been completed but prior to the placement of the finished surface material, (Class 2 base, A.C. Pavement, and P.C.C. Concrete).
The cost of repairs or corrections necessary to conform to the testing requirements will be borne by the Contractor at no cost to the City of El Centro.
A watertight field performance test shall be accomplished according to ASTM F1417 or ASTM C969 as determined by the Construction Manager/Resident Engineer. The costs to complete the watertight field performance test shall be borne by the Contractor
I. CONCRETE
The portland concrete cement for the manhole bases, manhole grade rings, and all other concrete infrastructure shall be Type “V” and contain a minimum of 7 sacks of cement per cubic yard and attain
18.a
Packet Pg. 571 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 97 5,000 psi compressive strength after 28 days of curing. The concrete slump shall not exceed 4.5 inches.
The City Engineer shall be provided with a copy of the concrete vendor’s delivery slip. One (1) slip shall be provided for each concrete delivery truck. One (1) set of concrete cylinders shall be obtained for every six (6) manhole bases constructed at a project site. It shall not be required to obtain and test concrete cylinders on projects with less than six (6) manhole bases. A set of cylinders shall be defined as three (3) cylinders. One (1) cylinder shall be tested 7 days after concrete placement. The second cylinder shall be tested 28 days after concrete placement. The third cylinder shall be held in reserve and tested at the direction of the City Engineer.
J. DUCTILE IRON FITTINGS
Fittings for the stormwater pipeline shall be composed of ductile iron. The ductile iron mechanical joint fittings shall conform to AWWA C153. The ductile iron-flanged fittings shall conform to AWWA C110.
The fittings shall be cement mortar lined in accordance with ANSI/AWWA C104/A21.4, standard for cement mortar lining for ductile iron, and gray iron pipe fittings for water, latest revision. The pressure rating for 3 inch – 24-inch diameter sizes shall be 350 psi. The pressure rating for 30 inch – 48-inch diameter sizes shall be 250 psi.
K. EXCAVATIONS FOR STORMWATER PIPELINE
Shallow, temporary excavations, less than four feet deep, in native clay soils should stand nearly vertical for short duration. All temporary excavations over four feet in depth will require shoring or slope inclinations in conformance to CAL OSHA Standards for Type C soils. These temporary deep excavations will require slope inclinations no steeper than 1:1 vertical height to horizontal length unless trench shoring is used.
Stable excavation slopes assumes minimal equipment vibration and adequate setback of excavated material and construction equipment from the top of the excavation. It is recommended that the minimum setback distance be equal to the depth of excavation and at least 5 feet from the crown of the slope. If excavated materials are stockpiled adjacent to the excavation, the weight of the material should be considered as a surcharge load for slope stability.
All excavations shall be constructed in conformance to the CALOSHA requirements. The Contractor shall be solely responsible for the safety of his personnel.
15. CEMENT SLURRY BACKFILL
If cement slurry backfill is required, cement slurry must be a fluid workable mixture of aggregate, cement, and water. The aggregate must be one of the following:
1. Commercial-quality concrete sand
2. Excavated of imported material in any combination, free of organic material and other deleterious substances and complying with the gradation requirements shown in the following table:
Sieve Size Percentage Passing
1-1/2” 100
1” 80-100
3/4” 60-100
3/8” 50-100
No. 4 40-80
No. 100 10-40
The cement must comply with Section 90-1.02B(2) of the Standard Specifications except testing is not required.
18.a
Packet Pg. 572 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 98 The water must be free from oils, salts, and other impurities that adversely affect the backfill.
Proportion cement slurry backfill by weight or volume. The backfill must contain at least 188 pounds of cement per cubic yard and enough water to produce a fluid workable mix that flows and can be pumped without segregation during placement.
End of Technical Specifications
18.a
Packet Pg. 573 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 99 City of El Centro
Project No.
PROPOSAL BID FORM
TO THE DIRECTOR OF PUBLIC WORKS OF THE CITY OF EL CENTRO:
The undersigned hereby declares that he has carefully examined the location of the proposed work that he has examined the plans and specifications and read the accompanying instructions to bidders and hereby proposes to furnish all material except owner furnished materials, and do all work required to complete the said work in accordance with said plans and specifications and special provisions for the unit prices set forth in the following schedule. The bidder shall furnish prices for all items shown in the proposal.
PROJECT BID SCHEDULE
BID ITEMS
BASE BID
Item
No. Description Quantity Unit Unit Cost Total Cost
1 "MOBILIZATION OF EQUIPMENT
AND MATERIAL, IID
ENCROACHMENT PERMIT FEE AND
REQUIREMENTS, COMPLIANCE
WITH NEPA/CEQA CATEGORICAL
EXEMPTION AND EXCLUSION
DETERMINATIONS, COMPLIANCE
WITH CALTRANS LAPM
REQUIREMENTS, CITY BUSINESS
LICENSE, TAXES, PERFORMANCE
BOND, PAYMENT BOND,
INSURANCE, POTABLE DRINKING
WATER, FREIGHT, UTILITY POTHOLE, PROJECT MEETINGS,
PROJECT SIGNS, AIR POLLUTION
CONTROL DISTRICT
REQUIREMENTS AND FEES,
RESTROOM FACILITIES, PERMITS,
PERMIT FEES AND SIMILAR
EXPENSES AND OTHER COSTS NOT
SPECIFICALLY ADDRESSED WITHIN
THIS BID ITEM LIST.
1 LS $________ $___________
2 SAWCUT THE EXISTING A.C.
PAVEMENT FOR THE FULL DEPTH
OF THE A.C. PAVEMENT. SEE
DEMOLITION KEYNOTE NO. 1 ON
PLAN SHEET 3.
633 LF $________ $___________
3 COLD PLANE EXISTING A.C.
PAVEMENT FOR A THICKNESS OF
0.20' MIN. PER DETAIL A ON SHEET
22 AND PIPELINE TRENCH DETAIL I
ON PLAN SHEET 23. CONTRACTOR
TO DISPOSE OF GRINDINGS. SEE
756 SF $________ $___________
18.a
Packet Pg. 574 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 100
Item
No. Description Quantity Unit Unit Cost Total Cost
DEMOLITION KEYNOTE NO. 2 ON
PLAN SHEET 3.
4 REMOVE AND DISPOSE OF
EXISTING A.C. PAVEMENT PER
DEMOLITION KEYNOTE NO. 3 ON
PLAN SHEET 3.
11 CYD $________ $___________
5 CLEAR AND GRUB ALL SURFACE
FREE OF CROPS, DEBRIS AND/OR
VEGETATION INCLUDING GRASS,
BRUSH AND WEEDS. SEE
DEMOLITION KEYNOTE NO. 5 ON
PLAN SHEET 3.
1 LS $________ $___________
6 EARTHWORK - CUT
GRADE EXISTING
NATIVE/UNDERLYING MATERIAL
TO SUBBASE DESIGN GRADE PER
DEMOLITION KEYNOTE NO. 3 AND 4
ON PLAN SHEET 3 AND
CONSTRUCTION KEYNOTE NO. 4, 5,
6, 7, 11, 12, 13, 14, 20, 26, 28, AND 29
ON PLAN SHEETS 4 THROUGH 8.
12,800 CYD $________ $___________
7 EARTHWORK - NATIVE FILL
GRADE AND COMPACT NATIVE
MATERIAL FOR ROADWAY,
PARKWAY, SHOULDER BACKING,
SWALE, AND BENEATH
INFRASTRUCTURE INSTALLATION
AREA TO SUBBASE DESIGN GRADE
PER CONSTRUCTION KEYNOTE NO.
4, 5, 6, 7, 11, 12, 13, 14, 20, 26, 28 AND
29 ON PLAN SHEETS 4 THROUGH 8.
370 CYD $________ $___________
8 EARTHWORK - TRANSPORT
TRANSPORT EXCESS NATIVE
MATERIAL TO PHASE I PROJECT
LIMIT.
12,430 CYD $________ $___________
9 ADJUST THE EXISTING WATER
VALVE FRAME AND COVER PRIOR
TO AND AFTER PAVING ACTIVITIES
PER DEMOLITION KEYNOTE 6 ON
SHEET 3 AND CONSTRUCTION
KEYNOTE 9 ON PLAN SHEETS 4
THROUGH 8. SEE DETAIL G ON
SHEET 22.
1 EA $________ $___________
10 PROTECT IN PLACE THE EXISTING
MONUMENT / MONUMENT WELL.
ADJUST THE EXISTING MONUMENT
WELL PRIOR TO AND AFTER
PAVING ACTIVITIES PER
DEMOLITION KEYNOTE 7 ON PLAN
4 EA $________ $___________
18.a
Packet Pg. 575 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 101
Item
No. Description Quantity Unit Unit Cost Total Cost
SHEET 3 AND CONSTRUCTION
KEYNOTE 10 ON PLAN SHEETS 4
THROUGH 8. SEE GENERAL NOTE
ON SHEET 1 AND SPECIFICATIONS
FOR PERPETUATION OF
MONUMENTATION.
11 ADJUST THE EXISTING SANITARY
SEWER/STORMWATER MANHOLE
FRAME AND COVER PRIOR TO AND
AFTER PAVING ACTIVITIES PER
DEMOLITION KEYNOTE 8 ON SHEET
3 AND CONSTRUCTION KEYNOTE 8
ON PLAN SHEETS 4 THROUGH 8.
2 EA $________ $___________
12 REMOVE AND DISPOSE OF THE
EXISTING POLE AFTER UTILITIES
HAVE BEEN RELOCATED TO THE
NEW LOCATION OF THE POLE. SEE
DEMOLITION KEYNOTE 9 ON SHEET
3. 1 EA $________ $___________
13 REMOVE AND DISPOSE OF
EXISTING CHAIN LINK FENCE AND
GATE PER DEMOLITION KEYNOTE
10 ON SHEET 3.
1 LS $________ $___________
14 REMOVE AND DISPOSE OF
EXISTING ABANDONED CONCRETE
CANAL LINING, HEADWALLS,
GATES, PIPELINES AND ALL OTHER
APPURTENANCES CONFLICTING
WITH SOUTH IMPERIAL AVENUE
PHASE II IMPROVEMENTS.
BACKFILL THE EXISTING CANAL
WITH NATIVE MATERIAL PER
DEMOLITION KEYNOTE 11 ON PLAN
SHEET 3.
1 LS $________ $___________
15 REMOVE AND DISPOSE OF THE
EXISTING DEAD END BARRICADE
AND SWING GATE. SEE
DEMOLITION KEYNOTE 12 ON
SHEET 3.
1 LS $________ $___________
16 REMOVE AND DISPOSE OF
EXISTING ABANDONED
ELECTRICAL SERVICE POLE PER
DEMOLITION KEYNOTE 15 ON PLAN
SHEET 3.
1 EA $________ $___________
17 INSTALL A.C. PAVEMENT PER
CONSTRUCTION KEYNOTE NO. 1, 2,
AND 31 ON PLAN SHEETS 4
THROUGH 8 AND WITHIN PIPE
TRENCH AREA.
5,200 TONS $________ $___________
18.a
Packet Pg. 576 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 102
Item
No. Description Quantity Unit Unit Cost Total Cost
18 INSTALL CLASS 2 BASE MATERIAL
PER CONSTRUCTION KEYNOTE NO.
1, 4, 7, 13, 14, 25, 28, 29, AND 31 ON
PLAN SHEETS 4 THROUGH 8 AND
WITHIN PIPE TRENCH AREA.
19,000 TONS $________ $___________
19 INSTALL 2" X 8" PRESSURE
TREATED BOARDS PER
CONSTRUCTION KEYNOTE 3 ON
PLAN SHEETS 4 - 8. SECURE THE 2"
X 8" PRESSURE TREATED BOARDS
WITH 2 FOOT LONG- 2" X 4" STAKES
3 FEET ON CENTER. SECURE THE
BOARDS TO THE WOOD STAKES
WITH FOUR (4) 16 CC SINKER NAILS.
SEE DETAIL B ON SHEET 22.
692 LF $________ $___________
20 INSTALL 6-INCH P.C.C. CURB AND
GUTTER INCLUDING DEPRESSED
P.C.C CURB AND GUTTER PER
CONSTRUCTION KEYNOTE 4 ON
PLAN SHEETS 4 THROUGH 8.
SUBGRADE PREPARATION AND
CLASS II BASE INSTALLATION IS
EXCLUDED FROM THIS BID ITEM.
2,164 LF $________ $___________
21 INSTALL NEW P.C.C. SIDEWALK
AND 4 INCHES OF GRANULAR SAND
MATERIAL PER CITY OF EL CENTRO
STANDARD DETAIL EC-400. SEE
DETAIL D ON SHEET 22 AND
CONSTRUCTION KEYNOTE 5 ON
PLAN SHEETS 4-8. SUBGRADE
PREPARATION IS EXCLUDED FROM
THIS BID ITEM.
9,943 SF $________ $___________
22 INSTALL P.C.C. HANDICAP RAMP
AND TRUNCATED DOMES PER
CALTRANS STANDARD PLAN A88A
CASE A AND CONSTRUCTION
KEYNOTE 7 AND 17 ON PLAN
SHEETS 4 THROUGH 8. SEE DETAIL
L ON SHEET 23. SEE BLOW-UP
DETAIL 1 ON SHEET 21. SUBGRADE
PREPARATION AND CLASS II BASE
INSTALLATION IS EXCLUDED FROM
THIS BID ITEM.
1 EA $________ $___________
23 INSTALL NEW STORMWATER
MANHOLE PER CONSTRUCTION
KEYNOTE 13 ON PLAN SHEETS 4
THROUGH 8 AND DETAIL S ON
PLAN SHEET 25. ADJUST THE
2 EA $________ $___________
18.a
Packet Pg. 577 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 103
Item
No. Description Quantity Unit Unit Cost Total Cost
MANHOLE FRAME AND COVER TO
FINISH GRADE AFTER PAVING
OPERATIONS ARE COMPLETE PER
DETAIL F ON SHEET 22.
24 INSTALL STORMWATER CATCH
BASIN PER DETAIL J ON SHEET 23
AND CONSTRUCTION KEYNOTE 14
ON PLAN SHEETS 4-8.
4 EA $________ $___________
25 INSTALL NEW 12-INCH DIA. SDR
26/PS 115 PVC STORMWATER
PIPELINE PER CONSTRUCTION
KEYNOTE 15 ON PLAN SHEETS 4-8
AND TRENCH DETAIL I ON PLAN
SHEET 23 WITH SAND BEDDING
AND BACKFILL MATERIAL.
EXCAVATION OF TRENCH,
COMPACTION OF
SUBGRADE/BACKFILL MATERIAL,
INSTALLATION OF PIPELINE WITH
SAND BEDDING, STRUCTURE
BACKFILL/NATIVE MATERIAL
BACKFILL AND ALL ASSOCIATIVE
WORK, MATERIALS, EQUIPMENT
AND LABOR ARE INCLUSIVE OF
THIS BID ITEM. EXCLUDE A.C.
PAVEMENT AND CLASS 2 BASE
INSTALLATION COST FROM THIS
BID ITEM.
150 LF $________ $___________
26 INSTALL NEW 18-INCH DIA. PS 115
PVC STORMWATER PIPELINE PER
CONSTRUCTION KEYNOTE 16 AND
TRENCH DETAIL I ON PLAN SHEET
23 WITH SAND BEDDING AND
BACKFILL MATERIAL.
EXCAVATION OF TRENCH,
COMPACTION OF
SUBGRADE/BACKFILL MATERIAL,
INSTALLATION OF PIPELINE WITH
SAND BEDDING, STRUCTURE
BACKFILL/NATIVE MATERIAL
BACKFILL AND ALL ASSOCIATIVE
WORK, MATERIALS, EQUIPMENT
AND LABOR ARE INCLUSIVE OF
THIS BID ITEM. EXCLUDE A.C.
PAVEMENT AND CLASS 2 BASE
INSTALLATION COST FROM THIS
BID ITEM.
620 LF $________ $___________
18.a
Packet Pg. 578 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 104
Item
No. Description Quantity Unit Unit Cost Total Cost
27 INSTALL NEW "TYPE A" A.C. DIKE
PER MODIFIED CALTRANS
STANDARD PLAN A87B PER
CONSTRUCTION KEYNOTE 18 AND
19 ON PLAN SHEETS 4-8. SEE DETAIL
M ON SHEET 23. APPLY TACK COAT
BETWEEN A.C. PAVEMENT
SURFACE AND A.C. DIKE PER
SECTION 39 OF CALTRANS
STANDARD SPECIFICATIONS
LATEST EDITION.
892 LF $________ $___________
28 INSTALL STREET LIGHT PER CITY
OF EL CENTRO STANDARD DETAIL
EC-900 OR DETAIL P ON SHEET 24
AND CONSTRUCTION KEYNOTE 21
ON PLAN SHEETS 4-8.
5 EA $________ $___________
29 INSTALL NEW NO. 3 1/2 NONTRAFFIC PULL BOX PER 2018
CALTRANS STANDARD PLANS ES8A AND CONSTRUCTION KEYNOTE
23 ON PLAN SHEETS 4-8.
3 EA $________ $___________
30 INSTALL NEW 3-INCH SCHEDULE 40
CONDUITS PER TRENCH DETAIL K
ON SHEET 23 FOR THE FUTURE
SIGNALIZATION ELECTRICAL LINE
INSTALLATION PER
CONSTRUCTION KEYNOTE 24 ON
PLAN SHEETS 4-8. INCLUDE
INSTALLATION OF CONCRETE
ENCASEMENT, CONDUIT
COVER/SHADING, AND WARNING
TAPE.
232 LF $________ $___________
31 INSTALL A 12-INCH DIAMETER
DUCKBILL CHECK VALVE PER
CONSTRUCTION KEYNOTE 27 ON
PLAN SHEETS 4-8.
1 EA $________ $___________
32 INSTALL P.C.C. DROP INLET
STRUCTURE PER DETAIL Q ON
SHEET 24 AND CONSTRUCTION
KEYNOTE 28 ON PLAN SHEETS 4-8.
1 EA $________ $___________
33 INSTALL NEW P.C.C. SIDEWALK
DRAIN WITH ALUMINUM COVER
PER DETAIL N ON SHEET 24 AND
CONSTRUCTION KEYNOTE 29 ON
PLAN SHEETS 4-8. SUBGRADE
PREPARATION AND CLASS II BASE
INSTALLATION IS EXCLUDED FROM
THIS BID ITEM.
2 EA $________ $___________
18.a
Packet Pg. 579 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 105
Item
No. Description Quantity Unit Unit Cost Total Cost
34 INSTALL 20' X 11' X 1.5' DEEP MIN.
SMALL ROCK SLOPE PROTECTION
(ROCK GRADATION FOR 7-INCH
THICK LAYER) PER SECTION 72-4 OF
2018 CALTRANS STANDARD
SPECIFICATIONS AND
CONSTRUCTION KEYNOTE 30 ON
PLAN SHEETS 4-8. INSTALL RSP
FABRIC TYPE "8" UNDERNEATH THE
RSP PER SECTIONS 72 AND 96-1.02I
OF 2018 CALTRANS STANDARD
SPECIFICATIONS.
37 CYD $________ $___________
35 CORE EXISTING STORM DRAIN
MANHOLE WALL AND INSTALL A
NEW 18-INCH DIA. STORMWATER
PIPELINE PER DETAIL O ON SHEET
24. MODIFY EXISTING MANHOLE
BOTTOM SHELF TO CREATE A
SMOOTH FLOW CHANNEL.
1 LS $________ $___________
36 SIGNAGE AND STRIPING PER PLAN
SHEETS 15 AND 16. 1 LS $________ $___________
37 STORMWATER POLLUTION
PREVENTION PLAN AND EROSION
CONTROL BMPS IMPLEMENTATION.
INCLUDE QUALIFIED SWPPP
PRACTITIONER (QSP) INSPECTION
AND REPORTING SERVICES.
1 LS $________ $___________
38 TRAFFIC CONTROL 1 LS $________ $___________
39 TRAFFIC SIGNALIZATION
MODIFICATION 1 LS $________ $___________
40 CONSTRUCTION STAKING AND
CERTIFICATE OF MONUMENT
PRESERVATION. 1 LS $________ $___________
41 GEOTECHNICAL ENGINEERING
TESTING FOR QUALITY CONTROL
(QC) PER THE CITY OF EL CENTRO'S
QUALITY ASSURANCE PLAN (QAP).
1 LS $________ $___________
42 SIGNALIZATION PER TRAFFIC
SIGNAL PLANS. 1 LS $________ $___________
18.a
Packet Pg. 580 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 106
Item
No. Description Quantity Unit Unit Cost Total Cost
43 INSTALL ELECTRICAL FACILITIES
PER ELECTRICAL PLANS, PLAN
SHEETS E-1 THROUGH E-8, FOR
STREET LIGHTS AND TRAFFIC
SIGNALIZATION.
1 LS $________ $___________
44 INSTALL NEW UNDERGROUND
ELECTRICAL CONDUIT(S) AND
OTHER ANCILLARY FACILITIES PER
THE CONTRACTOR NOTES,
DRAWINGS, AND SPECIFICATIONS
ISSUED BY THE IMPERIAL
IRRIGATION DISTRICT (IID) POWER
DIVISION. THE IID'S ELECTRICAL
FACILITIES SHALL BE
CONSTRUCTED IN ACCORDANCE
WITH THE IID'S REQUIREMENTS
UNDER IID'S SUPERVISION.
1 LS $________ $___________
Total Base Bid (consisting of the sum of items 1 through 44) is:
$________________________ (Amount of Total Bid written numerically as Dollars and Cents, in US Dollars)
$ _________________________________________________________________________________________ (Amount of Total Bid written in words as Dollars and Cents, in US Dollars)
18.a
Packet Pg. 581 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 107
The above bid, submitted above by a qualified prospective bidder, both in numerical form and written in words, shall constitute the Total Bid for this proposed project. The prospective bidder is responsible to place the amount bid for each and every one of the above items 1 through 22. Following receipt of sealed bids, the City of El Centro shall numerically add the amounts bid for all items 1 through 22. The amount of the Total Bid written in words shall be interpreted as a confirmation of the intent of the prospective bidder in preparing the Total Bid. The numerical sum of all bid items 1 through 22 as derived by the City shall be considered the correct Total Bid, in case an addition error has been made by the prospective bidder. The above Total Base Bid (including Alternatives, if selected) shall be the basis on which the Lowest Responsible Bid shall be selected by the City of El Centro for the proposed project.
1.00 – The undersigned hereby acknowledges the receipt of the following addendum (a):
None______; No. 1______; No. 2______; No. 3______; No. 4 ______; No. 5______
2.00 – The undersign hereby certifies that this proposal/bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation.
3.00 – The undersigned hereby accepts on the behalf of his firm all provisions and requirements of the contract documents, including but not limited to those related to time of completion and liquidated damages.
4.00 – The undersigned hereby certifies that they are authorized representative of the firm on whose behalf this proposal/bid is submitted and that they are acting at the direction and with the required approval of said firm, which is identified as follows:
Name of firm:
Address of firm:
Telephone Number: ( ) Fax Number: ( )
Contractor’s License Number: Type:
Signed: Date:
END OF PROPOSAL/BID FORM
18.a
Packet Pg. 582 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 108
EXHIBIT 12-G
BIDDER’S LIST OF SUBCONTRACTORS (DBE and NON-DBE) - PART I The Bidder shall list below the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of onehalf of one percent (.005%) of the prime contractor's total bid. The Bidder shall also list below the portion of the work which will be done by each subcontractor under this Contract. The prime contractor shall list only one subcontractor for each portion of the WORK. If the Bidder does NOT intend to use ANY subcontractors, then state “NONE” in the first block.
The Bidder's attention is directed to the provisions of Paragraph entitled “Subcontract Limitations,” of the Supplementary General Conditions which sets forth the percent of the WORK to be performed with the Bidder’s own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.
18.a
Packet Pg. 583 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase
Amount
Subcontracted DIR Reg Number
A
A
A
A
A
A
A
A
I
I
I
I
I
I
I
I
I
Local Assistance Procedures Manual Exhibit 12-B
Bidder’s List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder’s List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-Works/ContractorRegistration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the project.
In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater).
FEDERAL PROJECT NUMBER:
Photocopy this form for additional firms.
Subcontractor Name & Location Line Item & Description Subcontract Percentage of Bid Item
Contractor License Number DBE
(Y/N) DBE Cert Number Annual Gross Receipts
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Age of Firm in
years
Distribution – Original: Local Agency File; Copy: DLAE w/Award Package
September 2021
18.a
Packet Pg. 584 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
Ag
Ag
Ag
Ag
Ag
Ag
Ag
Ag
I
I
I
I
I
I
I
I
I
Local Assistance Procedures Manual Exhibit 12-B
Bidder’s List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder’s List of Subcontractor (DBE and Non-DBE) - Part 2 In accordance with Title 49, Section 26 of the Code of Federal Regulations, the Bidder shall list all subcontractors who provided a quote or bid but were not selected to participate as a subcontractor on this project.
FEDERAL PROJECT NUMBER:
Photocopy this form for additional firms.
Subcontractor Name & Location Line Item & Description Subcontract Amount
Percentage of
Bid Item
Subcontracted
Contractor License Number DBE
(Y/N) DBE Cert Number Annual Gross Receipts
DIR Reg Number
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Age of Firm in
years
Distribution – Original: Local Agency File; Copy: DLAE w/Award Package
September 2021
18.a
Packet Pg. 585 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 111
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder_________________________________________________________________, proposed subcontractor _________________________________________, hereby certifies that he has_______, has not______, participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President’s Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of ten thousand dollars($10,000) or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.
18.a
Packet Pg. 586 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 112
PUBLIC CONTRACT CODE
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In conformance with Public Contract Code §10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has ___ has not ___ been convicted within the preceding three (3) years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code §1101, with any public entity, as defined in Public Contract Code §1100, including the Regents of the University of California or the Trustees of the California State University. The term “bidder” is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in §10285.1.
Note: The bidder must place a check mark after “has” or “has not” in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
18.a
Packet Pg. 587 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 113
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code §10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes _____ No _____
If the answer is yes, explain the circumstances in the following space.
18.a
Packet Pg. 588 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 114
PUBLIC CONTRACT CODE 10232 STATEMENT
In conformance with Public Contract Code §10232, the Contractor hereby states under penalty of perjury that no more than one (1) final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two (2) year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
18.a
Packet Pg. 589 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 115
NONCOLLUSION AFFIDAVIT
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
State of California )
County of Imperial ) ss
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, ____________________________, being first duly sworn, deposes and says that he or she is ______________________ of____________________________the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation, that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; and that all statements contained in the bid are true; and further, that the bidder has not directly, or indirectly, submitted his/her/its bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Date:__________________________ _______________________________ Contractor’s Name
_______________________________
Contractor’s Signature
_______________________________
Title
END OF NONCOLLUSION AFFIDAVIT
18.a
Packet Pg. 590 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 116
NONCOLLUSION DECLARATION TO BE EXECUTED
BY
BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of ______________________, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state].
_______________________________
Name
_______________________________
Signature
_______________________________
Title
18.a
Packet Pg. 591 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 117
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past three (3) years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three (3) years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
18.a
Packet Pg. 592 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 118
NONLOBBYING CERTIFICATION
FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(l) No Federally-appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federally-appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure of Lobbying Activities,” in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into.
Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S.
Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than ten thousand dollars ($10,000) and not more than one hundred thousand dollars ($100,000) for each such failure.
The prospective participant also agrees by submitting his bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed one hundred thousand dollars ($100,000) and that all such subrecipients shall certify and disclose accordingly.
18.a
Packet Pg. 593 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 119
DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year ____ quarter _________
f. loan insurance date of last report ___________
4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Prime Subawardee
Tier _______ , if known
Congressional District, if known Congressional District, if known
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable ____________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. a. Name and Address of Lobby Entity b. Individuals Performing Services (including (If individual, last name, first name, MI) address if different from No. 10a) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)
11. Amount of Payment (check all that apply) 13. Type of Payment (check all that apply) $ _____________ actual planned a. retainer
b. one-time fee
12. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature ______________ e deferred
value ______________ f. other, specify _________________________
14. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) if necessary)
15. Continuation Sheet(s) attached: Yes No
16. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than ten thousand dollars ($10,000) and not more than one hundred thousand dollars ($100,000) for each such failure.
Signature: ________________________________________
Print Name: _______________________________________
Title: ____________________________________________
Telephone No.: ____________________ Date: ___________
Authorized for Local Reproduction
Federal Use Only: Standard Form – LLL Rev. 09-12-97
18.a
Packet Pg. 594 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 120
INSTRUCTIONS FOR COMPLETION OF SF-LLL,
DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether sub awardee or prime Federal recipient, at the initiation or receipt of covered Federal action or a material change to previous filing pursuant to title 31 U.S.C. section 1352. The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered Federal action. Attach a continuation sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence, the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District if known. Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or sub award recipient. Identify the tier of the sub awardee, e.g., the first sub awardee of the prime is the first tier. Sub awards include but are not limited to subcontracts, sub grants and contract awards under grants.
5. If the organization filing the report in Item 4 checks "Sub awardee" then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identification in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services and include full address if different from 10 (a). Enter Last Name, First Name and Middle Initial (Ml).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with Federal officials.
Identify the Federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.
15. Check whether or not a continuation sheet(s) is attached.
16. The certifying official shall sign and date the form; print his name title and telephone number.
Public reporting burden for this collection of information is estimated to average thirty (30) minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503. SF-LLL-Instructions Rev. 06-04-90«ENDIF»
18.a
Packet Pg. 595 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 121
BID AGREEMENT
The undersigned agrees that this bid may not be withdrawn within a period of ninety (90) days from the opening thereof, and further agrees that in case of default in executing the required contract with necessary bonds with the ten (10) days, not including Sunday, after having received notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid shall become the property of the City of El Centro, California.
The certified or cashier's check, cash deposit or bid bond accompanying this proposal is in the amount of ten percent (10%) or more of the aggregate amount of this bid.
The names of all persons interested in the foregoing proposal as principals are as follows:
IMPORTANT NOTICE
If bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if bidder or other interested person is an individual, state first and last names in full.
The undersigned is licensed in accordance with the Laws of the State of California, License No. _____________________________ Classification(s) ______________________________ ADDENDA This Proposal is submitted with respect to the changes to the contract included in addenda Number(s)_____________ (Fill in addenda numbers if addenda have been received and insert, in this Proposal, any Engineer's Estimate sheets that were received as part of the addenda.)
By my signature on this proposal I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code §§10162, 10232 and 10285.1 are true and correct and that the bidder has complied with the requirements of §8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this proposal I further certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Noncollusion Affidavit required by Title 23 United States Code, Section 112 and Public Contract Code Section 7106; and the Title 49 Code of Federal Regulations, Part 29 Debarment and Suspension Certification are true and correct.
Date ________________________________
Signature and Title of Bidder
Company Name _________________________________________________________ Business Address _________________________________________________________ Place of Business _________________________________________________________ Telephone Number_______________________ Fax Number ___________________
END OF BID AGREEMENT
Sign
Here
Signature of Bidder
18.a
Packet Pg. 596 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 122
CITY OF EL CENTRO
DEPARTMENT OF PUBLIC WORKS
BIDDER’S BOND
We, _________________________________________________________________________________________ ______________________________________________________________________________ as Principal, and ____________________________________________________________________________________________ as Surety are bound unto the City of El Centro, State of California, hereafter referred to as "Obligee," in the penal sum of ten percent (10%) of the total amount of the bid of the Principal submitted to the Obligee for the work described below, for the payment of which sum we bind ourselves, jointly and severally,
THE CONDITION OF THIS OBLIGATION IS SUCH, THAT:
WHEREAS, the Principal is submitted to the Obligee, for _______________________________________ ____________________________________________________________________________________________ (Copy here the exact description of work, including location as it appears on the proposal) ____________________________________________________________________________________________ for which bids are to be opened at __________________________ on ___________________________________ (Insert place where bids will be opened) (Insert date of bid opening) NOW, THEREFORE, if the Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him for signature, enters into a written contract, in the prescribed form, in conformance with the bid, and files two bonds with the Obligee, one to guarantee faithful performance of the contract and the other to guarantee payment for labor and materials as provided by law, then this obligation shall be null and void; otherwise, it shall remain in full force.
In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including actual costs and reasonable attorneys’ fee to be fixed by the court.
Dated: ____________________, 20_____.
_____________________________________________________
_____________________________________________________
_____________________________________________________
Principal
_____________________________________________________
Surety
By ___________________________________________________
Attorney-in-fact
CERTIFICATE OF ACKNOWLEDGEMENT
State of California
City/County of ______________________________________ ss On this ______ day of ________________________________________________ in the year 20 __________ before me ___________________________________ , personally appeared ____________________________________________ , Attorney-in-fact
personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the attorney-in-fact of __________________________ , and acknowledged to me that he (she) subscribed the name of the said company thereto as surety, and his (her) own name as attorney-in-fact. (SEAL) ___________________________________________________ Notary Public
END OF BIDDER’S BOND
18.a
Packet Pg. 597 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) I
Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
EXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT
1. Local Agency: 2. Contract DBE Goal:
3. Project Description:
4. Project Location:
5. Bidder's Name: 6. Prime Certified DBE: 7. Bid Amount:
8. Total Dollar Amount for ALL Subcontractors: 9. Total Number of ALL Subcontractors:
10. Bid 12. DBE 14. DBE 11. Description of Work, Service, or Materials 13. DBE Contact Information Item Certification Dollar Supplied (Must be certified on the date bids are opened) Number Number Amount Local Agency to Complete this Section upon Execution of Award
21. Local Agency Contract Number: 15. TOTAL CLAIMED DBE PARTICIPATION
22. Federal-Aid Project Number:
%
23. Bid Opening Date:
24. Contract Award Date:
IMPORTANT: Identify all DBE firms being claimed for credit,
25. Award Amount: ________________________________________________________ regardless of tier. Names of the First Tier DBE Subcontractors and their respective item(s) of work listed above must be consistent, where applicable with the names and items of the work in the Local Agency certifies that all DBE certifications are valid and information on "Subcontractor List" submitted with your bid. Written confirmation of this form is complete and accurate. each listed DBE is required.
26. Local Agency Representative's Signature 27. Date 16. Preparer's Signature 17. Date
28. Local Agency Representative's Name 29. Phone 18. Preparer's Name 19. Phone
30. Local Agency Representative's Title 20. Preparer's Title DISTRIBUTION: 1. Original – Local Agency
2. Copy – Caltrans District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de-obligation of federal funds on contract.
3. Include additional copy with award package.
LPP 18-01 Page 1 of 3
January 2019
18.a
Packet Pg. 598 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 124
INSTRUCTIONS - LOCAL AGENCY BIDDER
DBE COMMITMENT (CONSTRUCTION CONTRACTS)
ALL BIDDERS:
PLEASE NOTE: This information may be submitted with your bid. If it is not, and you are the apparent low bidder or the second or third low bidder, it must submitted and received as specified in the Special Provisions. Failure to submit the required DBE commitment will be grounds for finding the bid nonresponsive The form requires specific information regarding the construction contract: Local Agency, Location, Project Description, Total Contract Amount, Bid Date, Bidder’s Name, and Contract DBE Goal.
The form has a column for the Contract Item Number and Item of Work and Description or Services to be Subcontracted or Materials to be provided by DBEs. Prime contractors shall indicate all work to be performed by DBEs including, if the prime is a DBE, work performed by its own forces, if a DBE. The DBE shall provide a certification number to the Contractor and expiration date. Enter the DBE prime’s and subcontractors’ certification numbers.The form has a column for the Names of DBE contractors to perform the work (who must be certified on the date bids are opened and include the DBE address and phone number).
IMPORTANT: Identify all DBE firms participating in the project regardless of tier. Names of the First-Tier DBE Subcontractors and their respective item(s) of work listed should be consistent, where applicable, with the names and items of work in the "List of Subcontractors" submitted with your bid.
There is a column for the DBE participation dollar amount. Enter the Total Claimed DBE Participation dollars and percentage amount of items of work submitted with your bid pursuant to the Special Provisions. (If one hundred percent (100%) of item is not to be performed or furnished by the DBE, describe exact portion of time to be performed or furnished by the DBE.) See Section “Disadvantaged Business Enterprise (DBE),” of the Special Provisions (construction contracts), to determine how to count the participation of DBE firms.
Exhibit 15-G must be signed and dated by the person bidding. Also list a phone number in the space provided and print the name of the person to contact.
Local agencies should complete the Local Agency Contract Award, Federal-aid Project Number, Federal Share, Contract Award Date fields and verify that all information is complete and accurate before signing and filing.
18.a
Packet Pg. 599 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.
Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:
Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:
Names, addresses and phone numbers of firms selected for the work above:
E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:
May 2020
18.a
Packet Pg. 600 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:
G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):
Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:
May 2020
18.a
Packet Pg. 601 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
I I I
I I
I I I
I I I
Local Assistance Procedures Manual Exhibit 17-O
Disadvantaged Business Enterprises (DBE) Certification Status Change EXHIBIT 17-O DISADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIFICATION STATUS CHANGE
1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4. Contract Completion Date
5. Contractor/Consultant 6. Business Address 7. Final Contract Amount
8. Contract
Item
Number
9. DBE Contact Information
10. DBE
Certification
Number
11. Amount Paid
While Certified
12. Certification/
Decertification
Date
(Letter Attached)
13. Comments
If there were no changes in the DBE certification of subcontractors/subconsultants, indicate on the form.
I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT
14. Contractor/Consultant Representative’s Signature 15. Contractor/Consultant Representative’s Name 16. Phone 17. Date
I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S) HAS BEEN MONITORED
18. Local Agency Representative’s Signature 19. Local Agency Representative’s Name 20. Phone 21. Date DISTRIBUTION: Original – Local Agency, Copy – Caltrans District Local Assistance Engineer. Include with Final Report of Expenditures ADA NOTICE: For individuals with sensory disabilities, this document is available in alternate formats. For information, call (916) 445-1233, Local Assistance Procedures Manual TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
July 23, 2015
18.a
Packet Pg. 602 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase
I I
I
I I I
I I I
Local Assistance Procedures Manual Exhibit 17-F
Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors EXHIBIT 17-F FINAL REPORT-UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES (DBE) AND FIRST-TIER SUBCONTRACTORS
1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4. Contract Completion Date
5. Contractor/Consultant 6. Business Address 7. Final Contract Amount
8. Contract
Item
Number
9. Description of Work, Service, or
Materials Supplied
10. Company Name and
Business Address
11. DBE
Certification
Number
12. Contract Payments 13. Date
Work
Completed
14. Date of
Final
Non Payment -DBE DBE
15. ORIGINAL DBE COMMITMENT AMOUNT $ 16. TOTAL
List all first-tier subcontractors/subconsultants and DBEs regardless of tier whether or not the firms were originally listed for goal credit. If actual DBE utilization (or item of work) was different than that approved at the time of award, provide comments on an additional page. List actual amount paid to each entity. If no subcontractors/subconsultants were used on the contract, indicate on the form.
I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT
17. Contractor/Consultant Representative’s Signature 18. Contractor/Consultant Representative’s Name 19. Phone 20. Date
I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S) HAS BEEN MONITORED
21. Local Agency Representative’s Signature 22. Local Agency Representative’s Name 23. Phone 24. Date DISTRIBUTION: Original – Local Agency, Copy – Caltrans District Local Assistance Engineer. Include with Final Report of Expenditures ADA NOTICE: For individuals with sensory disabilities, this document is available in alternate formats. For information, call (916) 445-1233, Local Assistance Procedures Manual TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
July 23, 2015
18.a
Packet Pg. 603 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase 130
18.a
Packet Pg. 604 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 131
AGREEMENT
CITY OF CENTRO, CALIFORNIA
THIS AGREEMENT, is dated as of the _______ day of ___________________, in the year 20___, by and between the City of El Centro, (“OWNER”), and _____________________________________ (“CONTRACTOR”)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK indicated in OWNER’s Contract Documents entitled “EXTENSION OF IMPERIAL AVENUE FROM WAKE AVENUE TO
DANENBERG DRIVE – PHASE II”
The WORK is generally described as follows:
This project involves construction of a new roadway from Wake Avenue to Danenberg Drive.
Project will include grading of native soil, subgrade preparation, installation of Class II Base, installation of A.C. Pavement, Crack Sealing activities, Type II Slurry installation, installation of a storm drain swale and pipe, installation of PCC sidewalk and curb ramps, adjustment of utility covers and traffic striping.
ARTICLE 2. CONTRACT TIME.
The WORK will be completed within two hundred (200) working days after the commencement of date stated in the Notice to Proceed.
ARTICLE 3. LIQUIDATED DAMAGES.
OWNER and CONTRACTOR recognize time is of the essence of this Agreement and OWNER will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Section 1-22 of the General Conditions.
They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the WORK is not completed on time. Accordingly, instead of requiring any such proof, the OWNER and CONRACTOR agree that as liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay OWNER one thousand dollars ($1,000) for each day, or portion thereof, that expires after the time specified in Article 2 herein.
ARTICLE 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule(s) and subject to the provisions for progress payments.
ARTICLE 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Section 1-29 of the General Conditions.
18.a
Packet Pg. 605 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 132
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the WORK consist of this Agreement and the following attachments to : this Agreement.
6.1 Invitation for Bids/ Advertisement.
6.2 Bid Requirements.
6.3 General Conditions
6.4 Supplemental General Conditions (State)
6.5 Technical Specifications
6.6 Special Conditions
6.7 Specifications
6.8 Special Provisions
6.9 Job Quantities
6.10 Bid Form
6.11 Bid Bond
6.12 Equal Employment Opportunity Certification
6.13 Public Contract Code Section 10285.1 Statement
6.14 Public Contract Code Section 10162 Questionnaire
6.15 Public Contract Code Section 10232 Statement
6.16 Debarment and Suspension Certification
6.17 Non-lobbying Certification
6.18 Disclosure of Lobbying Activities
6.19 Local Agency Bidder DBE Information
6.20 DBE information – Good Faith Efforts
6.21 Disadvantaged Business Enterprises (DBE) Certification Status Change
6.22 Final Report-Utilization of Disadvantaged Business Enterprises (DBE), First-Tier subcontractors
6.23 Bid Agreement
6.24 Agreement
6.25 Faithful Performance Bond
6.26 Labor and Material Bond
6.27 Workers’ Compensation Insurance Certification
6.28 Subcontractor’s Listing
6.29 Noncollusion Affidavit
6.30 Drug and Alcohol Testing Requirements
6.31 Corporate Certification or Partnership Information
6.32 Contractor’s Certification of Qualification for License Classification
6.33 Federal-aid Project Special Provisions
6.34 State Prevailing Wages
6.35 Federal Prevailing Wages
6.34 Plan Sheets 1 thru 34 titled “EXTENSION OF IMPERIAL AVENUE FROM WAKE AVENUE TO DANENBERG DRIVE – PHASE II”
There are no Contract Documents other than those listed in this Article 6. The Contract Documents may only be amended by Change Order as provided in Section 1-23 of the General Conditions. To the extent this Agreement conflict with the provisions of other documents, the provisions of this Agreement shall apply.
ARTICLE 7. ASSIGNMENT.
No assignment by a party hereto of any rights or obligations under or interests in the Contract
18.a
Packet Pg. 606 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 133
Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent the effect of this restriction may be limited by law). Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
ARTICLE 8. PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Architect by the CONTRACTOR and Certificates for Payment issued by the Architect, the CITY shall make progress payments on account of the Contract Sum to the CONTRACTOR as provided in the General Conditions.
This Agreement is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests that are not timely made in accordance with that Article. This AGREEMENT hereby incorporates the provisions of Article 1.7 as though fully set forth herein.] ARTICLE 9. RETENTION OF SECURITIES
Public Contract Code Section 22300 permits the substitution of securities for any monies withheld by a public agency to ensure performance under a contract, at the request and expense of the CONTRACTOR.
ARTICLE 10. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be
18.a
Packet Pg. 607 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 134
required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.
ARTICLE 11. PREVAILING WAGES
A. Wage rates for this Project shall be in accordance with the “General Wage Determination Made By the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1", for Imperial County. Wage rates shall conform with those posted at and the Project site.
B. The following Labor Code sections are hereby referenced and made a part of this Agreement:
1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.
2. Section 1777.4 - Apprenticeship Requirements.
3. Section 1777.5 - Apprenticeship Requirements.
4. Section 1813 - Penalty for Failure to Pay Overtime.
5. Sections 1810 and 1811 - Working Hour Restrictions.
6. Section 1775 - Payroll Records.
7. Section 1773.8 - Travel and Subsistence Pay.
ARTICLE !2. RECORD AUDIT
In accordance with Government Code, Section 8546.7, records of both the CITY and the CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.
ARTICLE 13. FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Agreement Sum, shall be paid by the CITY to the CONTRACTOR no sooner than thirty-five (35) days after a Notice of Completion has been recorded, unless otherwise stipulated in the Notice of Completion, provided the work has then been completed, the Agreement fully performed, and a final Certificate for Payment has been issued by the Architect.
ARTICLE 14. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the
18.a
Packet Pg. 608 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 135
CITY.
ARTICLE 15. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.
CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to CITY.
A. CONTRACTOR shall provide the following types and amounts of insurance:
Without limiting CONTRACTOR’s indemnification of CITY, and prior to commencement of Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to CITY.
General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
18.a
Packet Pg. 609 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 136
Pay on behalf of wording as opposed to reimbursement; Concurrency of effective dates with primary policies; Policies shall “follow form” to the underlying primary policies; and Insureds under primary policies shall also be insureds under the umbrella or excess policies.
Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.
CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees and volunteers.
Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on a CONTRACTOR’s Pollution Liability form or other form acceptable to CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.
Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.
Builder’s risk insurance. Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the CITY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.
The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY.
The policy shall contain a provision that all.
proceeds from the builder’s risk policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.
18.a
Packet Pg. 610 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 137
Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy.
Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sub limits and shall be submitted to the CITY prior to commencement of construction.
Other provisions or requirements
Proof of insurance. CONTRACTOR shall provide certificates of insurance to CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with CITY at all times during the term of this contract. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.
Duration of coverage. CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors. CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.
City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this Agreement.
18.a
Packet Pg. 611 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 138
Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.
Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss.
CONTRACTOR hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insurance clauses from each of its sub consultants.
Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.
Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.
Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
Additional insured status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.
18.a
Packet Pg. 612 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 139
Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Pass through clause. CONTRACTOR agrees to ensure that its sub-consultants, subcontractors, and any other party involved with the project that is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section.
CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.
City’s right to revise requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation.
Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by CITY.
Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
A. CONTRACTOR'S LICENSE
CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Class A Contractor's License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.
ARTICLE 16 REGISTRATION REQUIREMENTS [applicable to public works projects] Pursuant to Section 1771.1(a) of the Labor Code:
“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of
18.a
Packet Pg. 613 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 140
any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.”
CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects. CONTRACTOR must ensure registration with the DIR that is active and in good standing.
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
The CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that the same CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.
ARTICLE 17. CORPORATION IN GOOD STANDING
If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that , whose title is , is authorized to act for and bind the corporation.
ARTICLE 18. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.
ARTICLE 19. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, the CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:
1. Material that the CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.
2. Subsurface or latent physical conditions at the site differing from those indicated.
3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in the CONTRACT.
B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease
18.a
Packet Pg. 614 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 141
or increase in the CONTRACTOR's cost of or the time required for performance of any part of the work, the CITY will issue a change order under the procedures described in the General Conditions.
C. In the event that a dispute arises between the CITY and the CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in the CONTRACTOR's cost of or time required for performance of any part of the work, the CONTRACTOR shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. The CONTRACTOR shall retain any and all rights provided either by Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.
ARTICLE 20. LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if work is not completed within the contract time or in strict accordance with the Project Schedule, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that the CONTRACTOR shall pay to the CITY the sum of One Thousand dollars ($1,000) for each and every calendar day of delay beyond the Contract Time, or beyond any completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule, or beyond the time indicated in the Project Schedule for any individual Contract activity.
CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if the CONTRACTOR does not meet each and every aspect of any activity schedule, completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule. If the CITY accepts work or makes any payment under this Agreement after a default by reason of delays, the acceptance of such work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Contract Time, a completion schedule, the Project Schedule or the accrual of liquidated damages. In the event the same is not paid, the CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due the CONTRACTOR under the Agreement. This Article does not exclude recovery of damages under provisions of the Contract Documents, and is expressly in addition to the CITY’s ability to seek other damages.
CONTRACTOR is to refer to Section Project Construction Schedule for duration of individual activities. Liquidated damages may be assessed if any individual activity duration exceeds the time indicated for that activity on the Project Construction Schedule.
ARTICLE 21. ENTIRE CONTRACT
This Agreement constitutes the entire contract between the parties. No other agreements or contracts, whether oral or written, pertaining to the work to be performed, exist between the parties.
This Agreement can be modified only by an amendment in writing, signed by both parties. No waiver of any term or condition of this Agreement shall be a continuing waiver thereof.
18.a
Packet Pg. 615 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 142
IN WITNESS WHEREOF, OWNER and CONTRACTOR have caused this Agreement to be executed the day and year first above written.
OWNER: CITY OF EL CENTRO
_________________________________________
CITY MANAGER, CITY OF EL CENTRO
ATTEST:
___________________________________
CITY CLERK, CITY OF EL CENTRO
APPROVED AS TO FORM AND LEGALITY:
____________________________________
CITY ATTORNEY
DATED:____________________ 201___
CONTRACTOR: COMPANY NAME____________________________________ LICENSE NO.
BUSINESS ADDRESS_______________________ STATE/ZIP__________________ TELEPHONE NO.________________________ FAX NO. ______________________ SIGNATURE:__________________________ TITLE _________________________ SIGNATURE:__________________________ TITLE _________________________ If the contractor is a corporation two officers of the corporation shall sign the agreement.
END OF AGREEMENT
18.a
Packet Pg. 616 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 143
FHWA 1273 CERTIFICATION
The bidder, under penalty of perjury, certifies that, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager, shall comply with the provisions of the Form FHWA 1273 included in the Special Provisions. The provisions apply to all work performed on the contract including work performed by the subcontract. The unmodified Form 1273 is required to be physically incorporated into each contract, subcontract and subsequent lower-tier subcontracts. The provisions may not be incorporated by reference.
The prime contractor is responsible for compliance with the requirements by all subcontractors and lower tier subcontractors. Failure of the prime contractor to comply with this requirement is grounds for local agency termination of the contract with the contractor and debarment of the contractor by the FHWA.
Name of Contractor
Address
Signature:
Date:
18.a
Packet Pg. 617 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 144
ARTICLE 8. FORM FHWA-1273 PROVISIONS
18.a
Packet Pg. 618 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 145
18.a
Packet Pg. 619 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 146
18.a
Packet Pg. 620 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 147
18.a
Packet Pg. 621 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 148
18.a
Packet Pg. 622 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 149
18.a
Packet Pg. 623 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 150
18.a
Packet Pg. 624 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 151
18.a
Packet Pg. 625 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 152
18.a
Packet Pg. 626 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 153
FAITHFUL PERFORMANCE BOND
Whereas, The City Council of the City of El Centro, State of California, and _________________________________ (hereinafter designated as “principal”) have entered into an agreement whereby principal agrees to install and complete certain designated public improvements, which said agreement, dated __________, 20___, and identified as project _______________________________________________, is hereby referred to and made a part hereof; and
Whereas, Said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.
Now, therefore, we, the principal and _____________________________________, as surety, are held and firmly bound unto the City of El Centro (hereinafter designated as “El Centro”) in the penal sum of ____________________ dollars ($__________) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above-bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless El Centro, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by El Centro in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.
In Witness Whereof, this instrument has been duly executed by the principal and surety above named, on ______________________, 20__.
_____________________________
PRINCIPAL
_____________________________
SURETY
BY ___________________________
ATTORNEY IN FACT
END OF FAITHFUL PERFORMANCE BOND
18.a
Packet Pg. 627 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 154
LABOR AND MATERIAL BOND
Whereas, The City Council of the City of El Centro, State of California, and _________________________ (hereinafter designated as “the principal”) have entered into an agreement whereby the principal agrees to install and complete certain designated public improvements, which agreement, dated _____, 20 ___, and identified as project ____________________________________, is hereby referred to and made a part hereof; and
Whereas, Under the terms of the agreement, the principal is required before entering upon the performance of the work, to file a good and sufficient payment bond with the City of El Centro to secure the claims to which reference is made in Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code of the State of California.
Now, therefore, the principal and the undersigned as corporate surety, are held firmly bound unto the City of El Centro and all contractors, subcontractors, laborers, materialmen, and other persons employed in the performance of the agreement and referred to in Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code in the sum of ____________________________________________________ dollars ($__________), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of El Centro in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.
In witness whereof, this instrument has been duly executed by the principal and surety above named, on _____, 20___.
_______________________________
PRINCIPAL
_______________________________
SURETY
BY____________________________
ATTORNEY IN FACT
END OF LABOR AND MATERIAL BOND
18.a
Packet Pg. 628 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 155
WORKERS’ COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract. _____________________________ ____________________________ Date Contractor’s Name
____________________________
Contractor’s Signature
____________________________
Title
ATTEST:
By _____________________________
Signature
___
__________________________
Title
END OF WORKERS’ COMPENSATION INSURANCE CERTIFICATE
18.a
Packet Pg. 629 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 156
DRUG/ALCOHOL TESTING REQUIREMENTS
The Contractor shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.
I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.
Contractor certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code §§8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. sections 701 et seq.) In addition, Contractor agrees to submit a copy of its own drug free workplace policy.
Dated_____________________________ __________________________________ Contractor’s Name
__________________________________
Contractor’s Signature
__________________________________
Title
END OF DRUG/ALCOHOL TESTING REQUIREMENTS
18.a
Packet Pg. 630 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 157
CORPORATE CERTIFICATION
OR
PARTNERSHIP INFORMATION
Name of Corporation or Partnership_________________________________________________ State of Incorporation_____________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer. ______________________________________________________________________________ ______________________________________________________________________________ _______________________________________________________________________________ Date_____________________________ Contractor____________________________ Signature_________________________ Title________________________________ ATTEST:
________________________________________
Signature by
________________________________________
Title
END OF CORPORATE CERTIFICATION
18.a
Packet Pg. 631 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 158
CONTRACTOR’S CERTIFICATION OF QUALIFICATION
FOR LICENSE CLASSIFICATION
After award of the contract, the Contractor, whether an individual, co-partnership, limited partnership, corporation, or any other combination or organization, shall execute the following form:
1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.
2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.
3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.
If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.
For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.
DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:
SIGNATURE BY:___________________________________________ TITLE:_______________________________________________
18.a
Packet Pg. 632 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 159
WAGE RATES
(Latest edition of wage rates will be
included in this projects section on the
City Website:
http://www.cityofelcentro.org/pworks/ind
ex.asp?m=1&page=68)
18.a
Packet Pg. 633 Attachment: PHASE II VOLUME 1 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 634 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 635 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 636 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 637 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 638 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 639 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 640 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 641 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
2. 18.b
Packet Pg. 642 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 643 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 644 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 645 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 646 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 647 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 648 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 649 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 650 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 651 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 652 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 653 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 654 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 655 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 656 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 657 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 658 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.b
Packet Pg. 659 Attachment: PHASE II VOLUME 2 (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
18.c
Packet Pg
660
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) COUNTY CENTER 2
IMPERIAL
COUNTY
OFFICE OF
EDUCATION
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
AGRICULTURAL
FIELD
PROPOSED LINDA VISTA SUBDIVISION
BUENA VISTA SUBDIVISION
CITY OF EL CENTRO
WATER TREATMENT PLAN
DESERT VILLAGE
SUBDIVISION
VACANT LAND
VACANT LAND
TOWNSHIP LINE
TOWNSHIP LINE
DESERT ESTATES
SUBDIVISION
FARMER ESTATES
SUBDIVISION
COMMERCIAL /
MULTI-FAMILY
COMMERCIAL
RESIDENTIAL
APN 053-690-036
APN 052-280-014 APN 052-280-015
APN 052-380-032
APN 054-561-007
APN 054-380-024
APN 054-380-023
APN 054-551-045
APN 054-510-001
APN 052-380-006 APN 052-390-006
APN 053-690-036
APN 053-690-036
TRACT LINE
TRACT LINE
TRACT LINE
BUENA VISTA
SUBDIVISION
RETENTION
BASIN
RETENTION
BASIN
RETENTION
BASIN
88'
88'
80'
80'
44'
44'
60'
60'
128'
128'
128'
71'
65'
60'
60'
60'
60'
120'
44'
44'
88'
47'
64'
64'
110'
110'
110'
TENTH ST.
19TH STREET
INTERSTATE 8
WAKE AVENUE
NUFFER ROAD
FARMER DRIVE FARMER DRIVE 18TH ST. 18TH STREET
BARBARA WAY WHITNEY WAY
FARMER DRIVE
CYPRESS DRIVE
CHAPARRAL DR.
S 11TH ST.
JACARANDA DRIVE
DRIVE
FIELDVIEW COURT
RIVERVIEW AVENUE
FIELDVIEW AVENUE
VALLEYVIEW AVE
SKYVIEW AVE
MOUNTAINVIEW AVE
DESERTVIEW AVE
PALMVIEW AVE
CYPRESS DRIVE
MCCABE ROAD
SPERBER ROAD
BETTY JO MC NEESE LOOP
DAHLIA LATERAL
DATE DRAIN
DATE DRAIN
DATE DRAIN
MANUEL ORTIZ AVENUE
MEADOWVIEW AVENUE
CYPRESS DRIVE
MANZANITA DRIVE
DANENBERG DRIVE
WHITNEY WAY
COTTONWOOD DRIVE
CYPRESS
WHITNEY WAY
EIGHTH STREET
EIGHTH STREET
EIGHTH STREET
EIGHTH STREET
CLARK ROAD
LA BRUCHERIE ROAD
LA BRUCHERIE ROAD
LA BRUCHERIE ROAD
LA BRUCHERIE ROAD
MCCABE ROAD
BARBARA WAY
MCCABE ROAD
10TH STREET 10TH STREET
APPLESTILL ROAD
BETTY JO MC NEESE LOOP
VALLEYVIEW AVE
FIELDVIEW AVENUE
VALLEYVIEW AVE
14TH ST.
10TH ST.
9TH ST.
9TH ST.
CHAPARRAL DR.
FARMER DRIVE
RIVERVIEW AVENUE
IID DATE CANAL
IID DATE CANAL
IID DATE CANAL IID DATE CANAL IID DATE CANAL
IID DATE CANAL
IID DATE CANAL
SKYVIEW AVE
SPERBER ROAD
APPLESTILL ROAD
MEADOWVIEW AVENUE
19TH STREET
INTERSTATE 8
SHEET 4 SHEET 5 SHEET 6
SHEET 7 SHEET 8 SOUTH IMPERIAL AVE. SOUTH IMPERIAL AVE.
RANGE 13 EASTRANGE 14 EAST
MCCABE ROAD
DAHLIA LATERAL
DATE DRAIN
DATE DRAIN
DAHLIA LATERAL
DATE DRAIN
DIRT ROAD
WAKE AVENUE WAKE AVENUE
NUFFER ROAD
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
PROPOSED
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
SOUTH IMPERIAL AVE.
SHEET 3
SHEET 3
TBM#1
EL 970.74
TBM#2
EL 972.94
TBM#3
EL 973.03 TBM#4
EL 975.40
TBM#5
EL 982.35
TOWNSHIP LINE
0' 300' 600' 900'
SCALE: 1"=300'
300'
CITY OF EL
CENTRO
ELEVATION
DATUM
DESCRIPTION
BENCHMARK TABLE
BENCHMARK /
TBM
PK NAIL W/ METAL TAG "3696" ON TOP OF CURB AT NORTHWEST CORNER OF THE WAKE AVENUE AND S. IMPERIAL AVENUE INTERSECTION.
970.74 TBM 1
COTTON SPINDLE ON NORTH SIDE OF POWER POLE #1111378D. 972.94 TBM 2 CHISELED "X" ON TOP OF CURB AT THE END OF CURVE OF THE NORTHEASTCORNER OF THE INTERSECTION OF MANUEL ORTIZ AVENUE AND SOUTH IMPERIAL AVENUE.
TBM 3 973.03
CHISELED "X" ON TOP OF CURB AT THE END OF CURVE OF THE NORTHEASTCORNER OF THE INTERSECTION OF VALLEYVIEW AVENUE AND SOUTH IMPERIAL AVENUE.
TBM 4 975.40
BRASS DISK AT THE SOUTHEAST CORNER OF THE DAHLIA LATERAL HEADWALL STRUCTURE, NORTH OF McCABE ROAD.
TBM 5 982.35
PROJECT
BENCH MARK
"C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN
RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT(12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD).
PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
HORIZONTAL: NAD 83 (2011) POSITION - SPC CA 6 [- 1,851,748.52 N, 6,792,215.91 E ] IN FEET
985.97
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 2_INDEX SHEET.dwg 06/10/2022 08:23 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 "CORFMAN 1979" - HORIZONTAL CONTROL POINT #1
THE STATION IS LOCATED 1.4 MILES WEST OF THE TOWN OF HEBER IN THE SOUTHEAST QUADRANT OF THE INTERSECTION OF HEBER RD. AND CORFMAN RD. TO REACH THE STATION FROM THE POST OFFICE IN HEBER GO WEST ON STATE HIGHWAY 86, HEBER RD., FOR 1.3 MILES TO A POINT WHERE HIGHWAY 86 BEGINS A TURN TO THE RIGHT, CONTINUE STRAIGHT AHEAD, WEST, FOR 0.1 MILE ON HEBER RD. TO THE INTERSECTION OF CORFMAN ROAD AND THE STATION ON THE LEFT. THE STATION MARK IS A STANDARD CADT DISK STAMPED - CORFMAN 1979 - SET IN THE TOP OF A SQUARE CONCRETE MONUMENT, 58.04 FT. EAST OF A STANDARD CADT DISK STAMPED - CORFMAN RM NO 1 1979 - SET IN THE TOP OF A SQUARE CONCRETE MONUMENT, 81.95 FT. FROM A STANDARD CADT DISK STAMPED - CORFMAN RM NO 2 1979 - SET IN THE TOP OF A SQUARE CONCRETE MONUMENT, 28 FT. SOUTH OF THECENTERLINE OF HEBER RD., 11 FT. EAST OF THE CENTERLINE OF CORFMAN RD., 3.5 FT. NORTHWEST OF POWER POLE NO. 20058 ID, 22.5 FT. SOUTHWEST OF THE SOUTHWEST CORNER OF A 3.5 FT. BY 6.5 FT. CONCRETE UTILITY VAULT, AND 0.4 FT. LOWER THAN THE CENTERLINE OF HEBER RD.
VERTICAL- NAVD 88 ORTHO HEIGHT= -11.00 FEET+1000 FEET = 989.00 HORIZONTAL: NAD 83 (2011) POSITION - SPC CA 6 [- 1,846,310.59 N, 6,776,512.62 E] IN FEET "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMANROAD).
PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97HORIZONTAL: NAD 83 (2011) POSITION - SPC CA 6 [- 1,851,748.52 N, 6,792,215.91 E ] IN FEET MC CABE RM 1 - HORIZONTAL CP #3
THE STATION IS LOCATED 4.9 MILES SOUTHWEST OF THE TOWN OF EL CENTRO IN THE NORTHWEST QUADRANT OFTHE INTERSECTION OF STATE HIGHWAY 111 AND MC CABE RD. TO REACH THE STATION FROM THE JUNCTION OF STATE HIGHWAY 111 AND INTERSTATE HIGHWAY 8, WHICH IS 4.0 MILES EAST OF EL CENTRO, GO SOUTH ON HIGHWAY 111 FOR 1.5 MILES TO THE INTERSECTION OF MC CABE RD. AND THE STATION ON THE RIGHT. THE STATION MARK IS A STANDARD CADT DISK STAMPED - MC CABE RM NO 1 1979 - SET IN THE TOP OF A SQUARE CONCRETEMONUMENT, 42.42 FT. NORTHEAST OF A STANDARD CADT DISK STAMPED - MC CABE RM NO 2 - SET IN THE TOP OF A SQUARE CONCRETE MONUMENT, 2 FT. EAST OF A NORTH SOUTH FENCE, 47 FT. WEST OF THE CENTERLINE OF THESOUTHBOUND LANES OF HIGHWAY 111, 80 FT. NORTH OF THE CENTERLINE OF MC CABE RD., 48.5 FT. EAST OF THE END OF A CONCRETE LINED DITCH, AND 0.7 FT. LOWER THAN THE EDGE OF PAVEMENT OF THE SOUTHBOUND LANES OF HIGHWAY 111.
VERTICAL- NAVD 88 ORTHO HEIGHT= -22.00 FEET+1000 FEET = 978.00 HORIZONTAL: NAD 83 (2011) POSITION - SPC CA 6 [- 1,854,461.40 N, 6,791,948.65 E] IN FEET DESCRIPTIONS POINT No.
HORIZONTAL CONTROL POINTS
1 2
3 2
INDEX SHEET AND HORIZONTAL
AND VERTICAL CONTROL DATA
BENCHMARK ELEVATION CONVERSION
PK NAIL W/ METAL TAG "3696" ON TOP OF CURB AT NORTHWEST CORNER OF THE WAKE AVENUE AND S. IMPERIAL AVENUE INTERSECTION.
BM
TBM 1
EQUATION: CITY ELEVATION - 671.88 = CALTRANS DATUM
CITY ELEVATION - 1.84 = IID DATUM
DESCRIPTION CITY OF
EL CENTRO
IID CALTRANS
970.74 969.90 298.86
18.c
Packet Pg. 661
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) PHASE
CON
SS
SS
AV
DEAD END POWER POLE
975975
975
975
971
971
971
971 971
971
971
971
971
972
972
972
972
972
972
972 972
972
972 972 972
972
972972
972
972 972
972
973
973
973
973 973
973 973 973 973 973
973
973 973 973 973 973 973 973
973
974
974
974
974974 974 974974
974 974
974 974
974
974
974974 974
974
974
974
974
974
976
976
977
977
965
972 972
970
972
PP# T4196D
PP# PW-0301
965 965 965 965
965 965 965 965
965 965 965 965
965 965
970
970 970 970 970
970 970 970 970 970
970 970
975
975
975
975
975975
975
975
975
PP# 3690
969 969 969
971 971
974
971
971 971 971
965
965
965
965
965
965
965
965
965
965
971
965
969 969
968 971
18.60'
17.75'
50'
50'
(TOP 975.88)
(INV 970.73)
FLOW FLOW FLOW
POT HOLE DATED 12-09-2015
STA 32+00
(TOP OF PIPE EL. 966.86)
POT HOLE DATED 12-09-2015
STA 36+00
(TOP OF PIPE EL. 967.66)
POT HOLE DATED 12-09-2015
STA 40+65.5
(TOP OF PIPE EL. 968.55)
HEADWALL
L EL. 968.87)
9)
S.S. MANHOLE
STA 34+74S
(TMH 973.64)
(N.INV 960.95)
(S.INV 961.01)
(18" W) (18" W) (18" W) (18" W) (18" W)
6" OVERFLOW PIPE
INV EL. --.---
OH
E
OHE OHE
OHE
OHE
(18" W)
4 4
7 7 7 7
19 23
24 18
26 26 26
4 1
2 2
35 IID DATE DRAIN IID DATE DRAIN
(21"SS) (18" SS) (18" SS) (18" SS) (21"SS) (21"SS) (21"SS)
TRACT LINE TRACT LINE
RIGHT OF WAY RIGHT OF WAY
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
4 4
4 4
4 4
4 4
4 4
4 10
1 2
2 143'
6 (NS 970.98)
(NS 971.72)(NS 971.00)
(NS 971.04)
(NS 971.01)
(NS 972.45)(NS 973.41)(NS 973.98)
(NS 971.79)
(NS 971.00)
(NS 971.00)
(NS 971.00)
(NS 972.85)
(NS 973.51)
(NS 974.01)
(NS 973.55)
(NS 971.46)
(NS 971.54)
(NS 971.73)(NS 971.26)
(NS 972.45)
(NS 973.53)
(NS 974.14)
(NS 971.59)(NS 971.52)(NS 972.00)(NS 971.39)(NS 972.96)(NS 974.36) (NS 974.95)
(NS 974.16)
(NS 971.84)
(NS 971.71)
(NS 972.00)(NS 971.93)
(NS 973.00)
(NS 973.46)
(NS 973.20)
(NS 972.48)
(NS 972.00)
(NS 972.00)
(NS 972.00)
(NS 973.10)
(NS 973.64)(NS 974.01)(NS 973.75)
(NS 972.54)
(NS 972.00)(NS 972.00)(NS 972.00)(NS 973.10)(NS 973.71)(NS 974.00)(NS 973.47) (NS 972.36)(NS 972.00)(NS 972.42)(NS 972.58)
(NS 973.08)
(NS 974.07)
(NS 974.64)
(NS 974.28)
(NS 973.28)(NS 972.83)(NS 972.95)(NS 972.44)(NS 973.83)(NS 974.00)(NS 974.00) (NS 974.04)
(NS 973.95)(NS 973.48)
(NS 973.23)
(NS 972.99)
(NS 974.00)
(NS 973.87)
(NS 973.86)(NS 973.97)
4 15
9 2'
7 (TC 971.38)(FL 970.88)
(TC 971.38)(FL 970.88)
1 (TP 971.87) 5' 1
19 7
7 7
10 5
5 5
5 5
5 5
5 5
5 5
RIGHT OF WAY 5
8 11
13 11
11 0+00E 1+00E
38 18 26
5'
IID DATE DRAIN
8 5
3 SOUTH IMPERIAL AVENUE ROW TO ROW
ROW TO TL ROW TO TL
FLOW
19 14 5
17 4
14 27
26 IID DATE 18A 25
(TOP 975.88)(INV 970.73)
PP# 1111377D
15 31
27 28
22 22
14 8
7 7
14 21
36 36
S.SSTA
(TM(N.(S.
28 ROW ℄
ROW ROW ROW ROW
ROW ROW ROW ROW
(NS 973.92)
(TOP EL. 975.71)
(INV EL. 969.04)
60'
110'
60'
32.9'
4 5
4 5 4 5
4 5
4 5
4 5
4 5
40' EASMENT
40' EASMENT
40' EASMENT
PHASE II LIMITS OF
CONSTRUCTION
4 5 4
(NS 972.69) (NS 973.32) (NS 973.47)
SOUTH IMPERIAL AVENUE TRACT LINE 11 25
7'
10 35' 10 ABANDONED ELECTRICAL SERVICE POLE 90'
10 60'
39' 21'
STA
40+96.58
7 45
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
110'
WTR MANHOLE
(TMH 972.07) THG FIELD
(TOP OF PIPE 970.57) CALC.*
(INV. 966.57) CALC.*
*WADELL DESIGN:
TMH 968.28 TOP OF PIPE 966.78 INV. 962.78
DIRT ROAD
DIRT ROAD
DIRT ROAD
DIRT ROAD
DIRT ROAD
TOE OF SLOPE
TOP OF SLOPE
TOE OF SLOPE
TOP OF SLOPE TOP OF SLOPE
DIRT ROAD
DIRT ROAD
TOP OF SLOPE
DIRT ROAD
83.00'
29+00S 30+00S 31+00S 32+00S 33+00S 34+00S 35+00S 36+00S 37+00S 38+00S 39+00S 40+00S 41+00S
14 PP# 200184
44 PP# 1111377D
PP# PW-0301
ABANDONED ELECTRICAL
SERVICE POLE
ABANDONED ELECTRICAL
SERVICE POLE
PHASE II LIMITS OF
CONSTRUCTION
ROW
ROW ROW ROW ROW
21 21 21
10 22 20
7 17
33 34
21 22
7 7
25 25 14
14 15
27 28
21 17
28 14
31 21
33 33 8
27 22
TO E.C. WTP
SD
SS
SS
9 975
7 975 975
975
971
971
971
971
972
72 972
972
972 972
972 972
972
972
972
972
972
972
972
972
972972
972972
972972
972
972
972
972
972
972
972
972 972
972
972
972 972
972
972
972
9 972 972 97
973 973
973
973
973
973 973
973
973
973 973
973 973 973
973
974
974 974
974
974
974
974 974
974 974
976
976
977
977
PP# 200185 PP# 1111702D PP# 1197007D
965 965
965
970
970 970
975
975
975
975
975
975
975
974
971 971
77 5
(48"W) (48"W) (48"W)
(18" W) (18" W) (18" W)
PP# 28399D PP# 23207
PP# T4196D
PP# 3690
TOP OF SLOPE
TOE OF SLOPE OHE
OHE OHE OHE
OHE OHE
OHE
(18" W)
(UG) (UG) (UG
(18" SS) (18" SS) (TMH 976.48) (N.INV 962.20) (S.INV 962.24) (TOP 970.34) (INV 961.56) (FL EL. 970.76)
(EP EL. 971.89)
DEAD END
POWER POLE
126.44'
32.9'
18.67'
63'
63.14'
27 2 2
3 3
5 4
7 19
14 14 14
10 10
6 8
6 6 6
4 4
4 7
9 18
16 16 16
32 3
7 7
5 25
27 29
30 28
24 10
10 33
14 28
26 26
35 43
43 43
41 40 42
39 37
42 ROW
ROW
13 (NS 974.04)
(NS 974.05)
(NS 973.83)
(NS 973.40)
(NS 973.86)
(NS 974.01)
(NS 974.01)
(NS 972.02)
(NS 973.00)
(NS 972.16)
(NS 974.01)
(NS 974.01)
(NS 972.00)
(NS 973.09)
(NS 972.00)
(NS 974.00)
(NS 974.01)
(NS 972.01)
(NS 972.00)
(NS 974.00)
(NS 974.00)
(NS 972.00)
(NS 973.46)
(NS 972.00)
(NS 973.01)
(NS 973.01)
(NS 972.00)
(NS 972.99)
(NS 972.00)
(NS 972.00)
(NS 975.84)
23 ROW
7 0+00E 1+00E 2+00E 3+00E 4+00E 5+00E 6+00E 7+00E 8+00E 9+00E
DANENBERG DRIVE
2'
17 13.00'
5'
10.1'
10.01'
PP# 1111378D PP# T4197D PP# 200182 14 PP# 200183 14 14 14
PHASE II LIMITS OF
CONSTRUCTION
12 PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
ROW ℄ ROW ℄ ROW ℄ ROW ℄
ROW
TBM#2
EL 972.94
PHASE III IMPROVEMENTS
11'
36.62'
1 STA 6+82.76E
MATCH EXISTING 43
STA 6+82.27E
MATCH EXISTING
1 STA 9+16.29E
ROW
ROW ROW ROW
36 5'
13.57' 231.99'
22 POT HOLE DATED 12-09-2015
STA 40+65.5
(TOP OF PIPE EL. 968.55)
ABANDONED ELECTRICAL
SERVICE POLE
(GATE 975.71)
(INV 969.09)
(GATE 975.88)
(INV 971.01)
19 38.12'
3'
27.82'
5.87'
13.57'
5.77'
ROW ℄
4 4 11
4 4
4 4
4 4
4 4 10
4 5 4 5 4 5 4 5 4 5
5 4
9 12
12 5
5 5
5 5 5 5
7 10
11 11
11 11 11
13 3
14 5
5 2
2 12
12 3 3
1 10
1 1 1 1 3
7 7
15 1 1
PHASE II LIMITS OF
CONSTRUCTION
ASE II LIMITS OF
NSTRUCTION
40+00S
41+00S
+00S
4 5
25 11
19 11
11 END EXISTING CANAL
DEMO AND BACKFILL
AT STATION 41+50S
PP# 1111376D
3 0' 40' 80' 120'
SCALE: 1"=40'
40'
EXISTING/DEMOLITION SITE PLAN ALONG SOUTH IMPERIAL
AVENUE AND DANENBERG DRIVE
STATION 29+00
PHASE II START DEMOLITION
STATION 40+96.58
END OF PHASE II DEMOLITION
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 3_EXISTING DEMO.dwg 06/10/2022 08:24 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
22 20
19 23
242125
11 SEE BELOW FOR DANENBERG
DRIVE
IMPERIAL AVENUE EXISTING/DEMOLITION SITE PLAN - PHASE II STA 29+00S TO STA 40+96.58S
DANENBERG DRIVE EXISTING/DEMOLITION SITE PLAN - PHASE II STA 0+00E TO STA 9+29.30E
SAWCUT THE EXISTING A.C. PAVEMENT FOR THE FULL DEPTH OF THE A.C.
PAVEMENT.
COLD PLANE EXISTING A.C. PAVEMENT FOR A THICKNESS OF 0.20' MIN. PER DETAIL A ON SHEET 22. CONTRACTOR TO DISPOSE OF GRINDINGS.REMOVE AND DISPOSE OF EXISTING A.C. PAVEMENT AND UNDERLYING MATERIAL TO SUBBASE DESIGN GRADE.
REMOVE AND DISPOSE OF EXISTING NATIVE MATERIAL TO SUBBASE DESIGN GRADE.CLEAR AND GRUB ALL SURFACE FREE OF CROPS, DEBRIS AND/OR VEGETATION INCLUDING GRASS, BRUSH, WEEDS AND TREE STUMPS.
CONTRACTOR TO LOWER THE WATER VALVE RISER TO 0.30 FEET BELOW FINISHGRADE PRIOR TO PAVING ACTIVITIES.
THE CONTRACTOR TO PROTECT IN PLACE THE EXISTING MONUMENT / MONUMENT WELL. THE CONTRACTOR SHALL GRADE AROUND THE PERIMETER OF THE EXISTING MONUMENT / MONUMENT WELL. THE CONTRACTOR SHALL LOWER THE EXISTING MONUMENT WELL 0.30 FEET BELOW GRADE PRIOR TOPAVING ACTIVITIES. SEE DETAIL H ON SHEET 22.
CONTRACTOR TO LOWER THE SANITARY SEWER MANHOLE FRAME AND COVER TO 0.30 FEET BELOW FINISH GRADE PRIOR TO PAVING ACTIVITIES.
EXISTING POWER LINE/TELEPHONE LINE TO BE RELOCATED BY OTHERS.
CONTRACTOR SHALL REMOVE AND DISPOSE OF THE EXISTING POLE AFTER UTILITIES HAVE BEEN RELOCATED TO THE NEW LOCATION.REMOVE AND DISPOSE OF THE EXISTING CHAIN-LINK FENCE AND SWING GATE.REMOVE AND DISPOSE OF ALL OTHER APPURTENANCES INCLUDING, BUT NOTLIMITED TO, STEEL POSTS AND P.C.C. FOOTINGS.REMOVE AND DISPOSE OF EXISTING ABANDONED CONCRETE CANAL LINING,HEADWALLS, GATES, PIPELINES AND ALL OTHER APPURTENANCES CONFLICTING WITH SOUTH IMPERIAL AVENUE PHASE II IMPROVEMENTS. CONTRACTOR SHALL
BACKFILL THE EXISTING CANAL WITH NATIVE MATERIAL TO MATCH EXISTING TOP OF CANAL ELEVATION. COMPACT THE NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.REMOVE AND DISPOSE OF THE EXISTING DEAD-END BARRICADE AND SWING GATE.
EXISTING IID UTILITIES TO BE EITHER REMOVED, ABANDONED IN PLACE,REPLACED OR RELOCATED BY OTHERS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITES COMMENCEMENT. CONTRACTOR SHALL ASSUME ALL
IID UTILITIES DESIGNATED BY THIS KEYNOTE HAVE BEEN ADDRESSED PRIOR TO THE START OF CONSTRUCTION.
CONTRACTOR TO LOWER THE STORM WATER MANHOLE FRAME AND COVER TO
0.30 FEET BELOW FINISH GRADE PRIOR TO PAVING ACTIVITIES. SEE DETAIL F ONSHEET 22.
REMOVE AND DISPOSE OF EXISTING ABANDONED ELECTRICAL SERVICE POLE.
DEMOLITION KEYNOTES
1 23
4 56
7 89
10 11
12131415
STATION 9+29.30E END
OF PHASE II
DEMOLITION
SEE ABOVE FOR IMPERIAL HIGHWAY
EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100.EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&T DISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86. 2730282631322933343536373839404142434445
SCALE: 1"=40'
SCALE: 1"=40'
PHASE III
IMPROVEMENTS
18.c
Packet Pg. 662
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 970 966
967
966
967
968
968
969
969
971
971
971
965
965
965
965
965
965
970
970
966
966
967
967
967 967
968 968
969
969
971
965
966
967 968
970 970
970 970 970
970
975
971 971 971 971 971
972
972
972
972 972
972
972 972
973 973 973 973 973
973
974
974
E
AV
29+00S 30+00S 31+00S 32+00S 33+00S
AV
260' TRANSITION FROM CROWNED TO SUPER-ELEVATED ROADWAY
AGRICULTURAL FIELD
WATER
S=2.00%
S=2.00%
S=2.00% S=2.00%
S=2.00%
S=1.84%
S=2.00%
S=1.36%
S=2.00%
S=2.00%
S=0.27% S=0.27%
S=0.90% S=0.20% S=0.19%
ROW
℄ ℄
6.0'
5.0' 38.0' 43.0'
39.5' VARIES
ROW
℄
1 1
1 1
1 1
1 1
4 4 4
5 5
1 1
26 12 12 12
6 14 6 6 6 6
12 S=0.27%
AT STATION 29+00S
4 6.0'
55.0'
ROW TO ℄
18.6'
5.0'
31.5'
32+50S
16 S/W
VARIES
6.0'
6.0' 6.0'
AV
(21"SS) 18 (21"SS)
SEE SHEET 5 FOR MATCHLINE
AT STATION 33+50S
ROW TO ℄ (21"SS)
PHASE II IMPROVEMENTS BEGIN (21"SS) 2.0'
4 4 4
6.0'
S/W
S=1.50%ROW
6.0'
ROW
S=1.50%
6.0'ROW ROW
S=1.50%
S=1.50%ROW
ROW
12 ROW ROW ROW ROW
OHE
26 26
5 26
2 2.0'
2 S=0.20%
9 (18" W) (18" W)
4 4
5.0'
IID DATE DRAIN
29+50S 30+50S 31+50S
TC 971.38
FL 970.88
TP 971.87
TP 971.95 TP 972.22
7 S=0.90%
RIGHT OF WAY
STREET/ROW CENTERLINE STREET/ROW CENTERLINE
TRACT LINE TRACT LINE
TOP OF SLOPE
TOP OF SLOPE
TOP OF S
TOP OF SLOPE
GRADE BREAK
STA 29+40S
7 26
4 8
7 7
4 3
38 SW 971.38
SW 971.47
SW 972.40
7 TC 971.93
FL 971.43
TC 971.62
FL 971.12
TC 972.07
FL 971.57
TC 972.52
FL 972.02 TC 972.75
FL 972.25
TC 973.20
FL 972.70
TC 973.42
FL 972.92
EP 973.56
SW 971.53 SW 971.73 SW 971.86
SW 972.00
SW 972.06 SW 972.27
TP 971.82
TP 971.82 TP 971.89
TP 972.16
GRADE BREAK TP 972.29 TP 972.36 TP 972.42
EP 973.46 EP 973.61
EP 973.70
SW 972.33
BEGIN TRANSITION
ROW CENTERLINE
TC 971.39
FL 970.89
TP 971.79
EP 973.36 EP 973.41
SW 971.39 SW 971.46 SW 971.93
3 26 26
18 STA 31+00.00S
TC 973.65
FL 973.15 STA 33+00.00S TC 971.84 FL 971.34
TC 971.30
FL 970.80 TC 971.33 FL 970.83
2 4
7 2
1 1
1 2
SW 972.20
SW 972.13 SW 971.80
SW 971.66
SW 971.33
STA 30+00.00S
TC 972.40
FL 971.90
EP 973.66
MATCH
EXISTING
GRADE
GRADE BREAK
TC 972.97
TC 972.29 FL 972.47
FL 971.79
FUTURE IID DATE DRAIN PIPELINE
RIGHT OF WAY
GRADE BREAK RIGHT OF WAY
STA 29+00.00S
STA 29+00.00S
BEGIN TAPER AND A.C. DIKE
55.0'
SW 971.55
SW 971.60
STA 32+00.00S
STA 32+00
EXT. 18" W
(TOP EL. 966.86)
EASEMENT
14 4
40'
SW 971.30
18"SD 12"SD 12"SD 12"SD
S.D. DISCHARGE
INV. 956.13
DROP INLET
GRATE 968.00
INV 961.27
TOP 971.00
BOT 968.03
S.D. CATCH BASIN
TMH 971.30
E.INV. 960.55
W.INV. 960.45
BOT 968.03
TOP 971.01
TOP 971.01
26 BOT 968.01
BOT 968.01
BOT 968.00
TOP 971.06
TOP 971.06
BOT 968.06
BOT 968.06
TOP 971.11
TOP 971.11
BOT 968.11
BOT 968.11
TOP 971.16
TOP 971.16
BOT 968.16
BOT 968.16
TOP 971.21
TOP 971.21
BOT 968.21
BOT 968.21
TOP 971.26
TOP 971.26
BOT 968.26
BOT 968.26
TOP 971.31
TOP 971.31
BOT 968.31
BOT 968.31
TOP 971.36
TOP 971.36
BOT 968.36
BOT 968.36 TOP 971.41
TOP 971.41
BOT 968.41
BOT 968.41
EASEMENT
5' 5' 9' 9'
2'
10'
5' 5' 9' 9'
2'
10'
5' 9' 9'
2'
10'
5' 5' 9' 9'
2'
10'
TOP OF SLOPE TOP OF SLOPE
TOP OF SLOPE TOP OF SLOPE
BOT. OF SLOPE BOT. OF SLOPE BOT. OF SLOPE
CONC. CHANNEL
FL 970.86
26 26 26 26 26
20 20 20
20 20
20 20
20 28
29 29
5 5
SW 972.23
SW 972.36
SW 972.32
SW 972.26
SIDEWALK DRAIN
FL 971.70
SW 972.25
4' 4' 4'
38.0'
TC 972.33
FL 971.83
TC 972.23
TC 971.38 FL 971.73
FL 970.88
TC 971.33
FL 970.83
TC 971.46
FL 970.96
TC 971.73
FL 971.23
TC 971.86
FL 971.36
STA 30+00.00S
TC 971.60
FL 971.10 TC 971.66 FL 971.16 TC 971.80 FL 971.30 TC 972.00 FL 971.50
TC 972.06
FL 971.56
TC 972.13
FL 971.63
TC 972.20
FL 971.70
TC 971.30
FL 970.80
TC 972.27
FL 971.77
STA 32+95.00S
STA 32+00.00S STA 31+00.00S
STA 29+00.00S
15 15
30 SD=3.0% SD=4.0% SD=4.0% SD=0.5% SW 971.69 SW 971.82 SW 971.95 SW 972.09 SW 972.22 SW 972.35 SW 972.49 S=3.91%
S=3.91%
S=3.91%
S=8.80%
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3 TOP OF SLOPE S=0.10% S=0.10% S=0.10% S=0.10% SOUTH IMPERIAL AVE.
7 STA 29+40.00S
BEGIN TRANSITION
GRADE BREAK
STA 29+50.00S
TC 971.39
FL 970.89
E
STA 32+95 S STA 29+00 S
STA 29+00 S
TOP 971.00
82.7'
TC 971.53
FL 971.03
TP 972.02 EP TO EP110.0' 45 10
STA 31+20.97S 21
S=2.00%
STA 32+67.47S
21.5'
END TRANSITION AND C&G
S=-0.00%
TP 972.09
S=1.08%
UE UE UE UE UE UE UE
5.5'
5.5'
5.5'
5.5'
5.5'
5.5'
12 TC 972.25
FL 971.75
82.5'
EP 973.51
9'
ROW ℄ ROW ℄ ROW
32 18
PHASE II LIMITS OF
CONSTRUCTION
MATCH
EXISTING
GRADE
5.0'
6.5' 5.5'
5.5'
5.0'
6.5'
5.0'
STA 29+74.47S 21
5.0'
S.D. CATCH BASIN
TMH 971.30
E.INV. 957.01
W.INV. 956.91
PHASE II LIMITS OF
CONSTRUCTION
MATCH
EXISTING
GRADE 30.22'
15 MATCHEXISTING
GRADE
23.0'
21.8'
21 10.0' 6.0' MATCH
EXISTING
GRADE
5.0'
TOP OF SLOPE 22
MATCH
EXISTING
GRADE
PHASE II LIMITS OF
CONSTRUCTION
40'
5'
22 22
MATCHEXISTING
GRADE 22
PHASE II LIMITS OF
CONSTRUCTION
MATCH
EXISTING
GRADE
22 22
18 5.0'
5' TRANSITION
FROM
TO
S= 0.20% S= 0.27% S= 0.27%
S= 0.27%
S= 0.27%
STA 28+75S
TP 971.92
STA 29+00S
TP 971.87
STA 29+25S
TP 971.82
STA 29+50S
TP 971.82
STA 29+75S
TP 971.89
STA 30+00S
TP 971.95
STA 30+25S
TP 972.02
STA 30+50S
TP 972.09
STA 30+75S
TP 972.16
STA 31+00S
TP 972.22
STA 31+25S
TP 972.29
STA 31+50S
TP 972.36
STA 31+75S
TP 972.42
STA 32+00S
TP 972.49
STA 32+25S
TP 972.56
STA 32+50S
TP 972.62
STA 32+75S
TP 972.69
STA 33+00S
TP 972.76
STA 33+25S
TP 972.82
STA 33+50S
TP 972.89 (EG 972.90)
(EG 971.84)
(EG 972.02)
(EG 972.78) (EG 972.73)
(EG 971.73)
(EG 972.18) (EG 972.40)
(EG 971.64) (EG 971.77) GRADE BREAK
STA 29+40.00
TP 971.79
STA 32+75
TP 972.69
STA 31+75
TP 972.42
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 966.36)
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 966.66)
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 967.06)
(EG 972.84)
EXISTING GRADE
EXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
EXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
TOP OF PAVEMENT
AT CENTERLINE
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 966.34)
GRADE BREAK
STA 29+40.00E
FL 970.801
GRADE BREAK
STA 32+00.00E
FL 973.150 GRADE BREAK
STA 32+00.00E
EPFL 973.360
END OF C&G
BEG. OF A.C. DIKE
STA 32+25S
EP 973.41
STA 32+50S
EP 973.46
STA 32+75S
EP 973.51
STA 33+00S
EP 973.55
STA 33+25S
EP 973.60
STA 33+50S
EP 973.65
STA 28+75S
FL 970.93
STA 29+00S
FL 970.88
STA 29+25S
FL 970.83
STA 29+50S
FL 970.83
STA 29+75S
FL 970.89
STA 30+00S
FL 970.96
STA 30+25S
FL 971.03
STA 30+50S
FL 971.10
STA 30+75S
FL 971.16
STA 31+00S
FL 971.23
STA 31+25S
FL 971.30
STA 31+50S
FL 971.36
STA 31+75S
FL 971.43
STA 32+00S
FL 971.50
STA 32+25S
FL 971.56
STA 32+50S
FL 971.63
STA 32+75S
FL 971.70
STA 33+00S
FL 971.76
STA 33+25S
FL 971.83
STA 33+50S
FL 971.90
STA 29+50S
FL 970.89
STA 29+75S
FL 971.12
STA 30+00S
FL 971.34
STA 30+25S
FL 971.57
STA 30+50S
FL 971.79
STA 30+75S
FL 972.02
STA 31+00S
FL 972.25
STA 31+25S
FL 972.47
STA 31+50S
FL 972.70
STA 31+75S
FL 972.92
0.20%
S= 0.90%
S= 0.90%
S= 0.90%
S= 0.27%
S= 0.27%
S= 0.27%
S= 0.19%
END TRANSITION
AND CURB AND
GUTTER. BEGIN
TAPER AND A.C. DIKE
WEST CURB AND GUTTER FLOWLINE
WEST CURB AND GUTTER FLOWLINE
WEST EDGE OF PAVEMENT AT A.C. DIKE
EAST CURB AND GUTTER FLOWLINE INSTALL NEW CATCH BASIN PER DETAIL J ON SHEET 23 AND SECTION A-A ON SHEET 9.
INSTALL NEW SIDEWALK
DRAIN STRUCTURE PERDETAIL N ON SHEET 24 W.INV 967.62
E. INV 967.52
FL 971.75
EAST AND WEST CURB AND GUTTERFLOWLINE
TRANSITION OF
P.C.C. CURB AND
GUTTER TO A.C.
DIKE
EAST CURB AND GUTTER FLOWLINE
5.0'
260' TRANSITION FROM CROWNED TO SUPER-ELEVATED ROADWAY
4 SOUTH IMPERIAL AVENUE PLAN AND PROFILE
FROM STATION 29+00S TO STATION 33+50S
STA 29 +00S STA 29 +50S STA 30 +00S STA 30 +50S STA 31 +00S STA 31 +50S STA 32 +00S STA 32 +50S STA 33 +00S STA 33 +50S
SOUTH IMPERIAL AVENUE TOP OF PAVEMENT AT ROW CENTERLINE PROFILE SCALEHORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
SEE SHEET 5 FOR MATCHLINE
AT STA 33+50S
PHASE II IMPROVEMENTS
BEGIN AT STA 29+00S
975974973972
971
970969968967966
975
974973972
971
970969968967966
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 4_IMPROVEMENT PLAN.dwg 06/10/2022 08:26 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 STA 29 +00S STA 29 +50S STA 30 +00S STA 30 +50S STA 31 +00S STA 31 +50S STA 32 +00S STA 32 +50S STA 33 +00S STA 33 +50S SOUTH IMPERIAL AVENUE EAST AND WEST FLOWLINE/EDGE OF PAVEMENT PROFILE SCALE HORIZONTAL:1" = 20' VERTICAL: 1" = 2'
SEE SHEET 5 FOR
PHASE II IMPROVEMENTS
MATCHLINE AT STA 33+50S
BEGIN AT STA 29+00S
977976975974973972
971
970
977976975974973972
971
970
A-A
4 9
A-A
4 9
B-B
4 9
B-B
4 9
INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEEGENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR AHORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION. INSTALL NEW P.C.C. CURB AND GUTTER TO A.C. DIKE TRANSITION PER DETAIL T ON SHEET 25.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. AMINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL 3 INCHES OF A.C. PAVEMENT OVER 9 INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ONSHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL. 1 23
4 5
6789
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
2223242526272829
30 31
32 3334
EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.
EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
22 20
19 273028
21 25
26313229
11 33343536373839404142434445
EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.
EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100.
EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.
EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.
EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&TDISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86.
2324
20 0 20 40 60
SCALE 1"= 20'
18.c
Packet Pg. 663
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 970
970
966 966
967
967 967
968
969
970 970 969 969
975
975
971 971
972 972
972 972 972 972
972
972
973 973
973
973
973973 973
973 973 973
974
974
974
974
974
974
974
974
974
974
974
E
SS
34+00S 35+00S 36+00S 37+00S 38+00S
ROW ROW ROW
ROW ROW ROW
S.S. MANHOLE
STA 34+74S
TMH 973.90
(N.INV 960.95)
(S.INV 961.01)
110.0'
RIGHT OF WAY
ROW
FUTURE IID DATE DRAIN PIPELINE
TRACT LINE
TRACT LINE
TOP OF SLOPE
TOP OF SLOPE
TOP OF SLOPE TOP OF SLOPE
6.0' 6.0'
STA 36+00
EX. 18" WATER PIPELINE
(TOP EL. 967.66)
SOUTH IMPERIAL AVE.
IID DATE DRAIN
AGRICULTURAL FIELD AGRICULTURAL FIELD
4 26
4 WATER
(21"SS) (18" SS) (18" SS) (18"
26 26 2
4 S=2.00% S=2.00%
S=2.00% S=2.00%
TC 972.36
FL 971.86
S=0.27% S=0.27% S=0.27% S=0.27%
S=0.19%
S=0.19
S=0.19%
S=0.19%
S=2.00% S=2.00%
6.0' 38.0' 40.3'
110.0'
ROW
SW 972.40 5
1 26
6 18
1 18 18
18 12
12 12
6 6 6
5 5
1 1
1 1
38.0'
34.8'
5 12
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
RIGHT OF WAY
EASEMENT
40'
EP 974.14
EP 974.33
SW 972.46
SW 972.53
SW 972.60 SW 972.66
SW 972.73
SW 972.80 SW 972.87 SW 972.93 SW 973.00
SW 973.07
SW 973.13
SW 973.27 SW 973.33 SW 973.40 SW 973.60
TC 973.13
FL 972.63
TC 973.20
FL 972.70
TC 973.27
FL 972.77
EASEMENT
40'
EP 974.19
EP 973.95 EP 973.99
EP 974.09 EP 974.24 EP 974.28 EP 974.38 EP 974.48
EP 974.53
29 STA 36+50.00S
EASEMENT
5 S=1.50%
S=1.50%
S=1.50%
S=1.50%
MATCH
EXISTING
GRADE
MATCHEXISTING
GRADE
MATCHEXISTING
GRADE
MATCH
EXISTING
GRADE
MATCHEXISTING
GRADE
S/W
S/W
26 6.0' 6.0'
S/W
ROW CENTER LINE ROW
CENTER LINE
CONC. CHANNEL
FL 971.51
38.5'
VARIES VARIES
6.0'
6.0'
VARIES
6.0'
5.0'
5.0'
5.0'
27.6'
EP 974.43
6.0'
VARIES
55.0'
EP 974.04
ROW TO ℄ 55.0'
ROW TO ℄
ROW
55.0'
ROW TO ℄
1 1
19 18
5'
TRANSITION
EP 973.90
5'
TRANSITION
EP 973.85
19 8
EP 973.80 EP 973.70 EP 973.75
SS
SEE SHEET 4 FOR MATCHLINE
AT STATION 33+50S
EP 973.66
SW 973.47
MATCHEXISTING
GRADE
STA 34+00.00S
STA 35+00.00S STA 36+00.00S
STA 37+00.00S
SEE SHEET 6 FOR MATCHLINE
AT STATION 38+00S STA 38+00.00S
40'
TC 973.60
FL 973.10
20.6'
VARIES
TC 972.40
FL 971.90
PHASE II LIMITS OF
CONSTRUCTION
34+50S 35+50S 36+50S 37+50S
PHASE II LIMITS OF
CONSTRUCTION
TOP 971.46TOP 971.46
TOP 971.41
TOP 971.41
TOP 971.51
TOP 971.51
TOP 971.56
TOP 971.56
TOP 971.61
TOP 971.61
TOP 971.66
TOP 971.66
TOP 971.71 TOP 971.76
TOP 971.76
TOP 971.81
TOP 971.81
BOT 968.41BOT 968.41
BOT 968.46
BOT 968.46
BOT 968.51
BOT 968.51
BOT 968.56
BOT 968.56 BOT 968.61
BOT 968.61
BOT 968.66BOT 968.66
BOT 968.71
BOT 968.71
BOT 968.76BOT 968.76
BOT 968.81
BOT 968.81
TOP 971.86
BOT 968.86
BOT 968.86
TOP 971.86
TOP OF SLOPE
TOP OF SLOPE
BOT. OF SLOPE
TOP OF SLOPE
TOP OF SLOPE
BOT. OF SLOPE
5' 5' 9' 9'
2'
10'
5' 5' 9' 9'
2'
10'
5' 5' 9' 9'
2'
10'
26 26 26 26 26
20 20 20
20 20
20 20
20 20
20 20
22 22 22 22 22
5 SIDEWALK DRAIN
FL 973.16 26 26
30 SW 973.18 SW 973.22
7 SW 973.20 SW 972.49 SW 972.62 SW 972.75 SW 972.89 SW 973.02 SW 973.16
SW 973.27 SW 973.31 SW 973.42 SW 973.56 SW 973.69
S=0.10%
S=12.12%
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3
S=1:3 S=1:3 S=0.10% S=0.10% S=0.10% S=0.10% S=0.10% S=
S=15.17%
S=19.56%
S=19.56%
S=19.56%
S=19.56%
S=19.56%
7 TC 973.07
FL 972.57 4 (18" W) TC 972.46
FL 971.96
4 TC 972.53
FL 972.03
STA 34+00.00S
TC 972.60
FL 972.10
TC 972.73
FL 972.23
TC 972.66
FL 972.16
4 TC 972.80
FL 972.30
(18" W) TC 972.87
FL 972.37
TC 972.93
FL 972.43
110.0'
TC 973.00
FL 972.50 4
18.9'
STA 36+00.00S
ROW CENTER LINE
(18" W) 4 29 4 TC 973.40 FL 972.90 4 TC 973.47 FL 972.97 STA 38+00.00S E
22 TOP 971.71
STA 34+13.97S 21 21STA 37+06.97S
TC 973.33
FL 972.83
STA 37+00.00S
UE UE UE UE UE UE UE
ROW ℄ ROW ℄ ROW ℄ ROW ℄ ROW ℄ RO
7 7
TC 973.53
FL 973.03
ROW TO ℄ 55.0'
SW 973.53
STA 35+00.00S
5 5.5'
5.5'
5.5'
5.5'
5.5'
5.5'
5.5'
5.0'
5.0'
5.0'
5.0'
5.0'
5.0'
S= 0.27%
S= 0.27%
S= 0.27%
S= 0.27% STA 33+25S
TP 972.82
STA 33+50S
TP 972.89
STA 33+75S
TP 972.96
STA 34+00S
TP 973.02
STA 34+25S
TP 973.09
STA 34+50S
TP 973.16
STA 34+75S
TP 973.22
STA 35+00S
TP 973.29
STA 35+25S
TP 973.36
STA 35+50S
TP 973.43
STA 35+75S
TP 973.49
STA 36+00S
TP 973.56
STA 36+25S
TP 973.63
STA 36+50S
TP 973.69
STA 36+75S
TP 973.76
STA 37+00S
TP 973.83
STA 37+25S
TP 973.89
STA 37+50S
TP 973.96
STA 37+75S
TP 974.03
STA 38+00S
TP 974.09
(EG 971.77) (EG 971.92)
(EG 972.96) (EG 972.97) (EG 972.96) (EG 972.96) (EG 972.97) (EG 972.98) (EG 973.00) (EG 973.27)
EXISTING GRADE EIXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
TOP OF PAVEMENT
AT CENTERLINE
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 967.16)
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 967.56)
EXISTING 18-INCH DIA.
WATER PIPELINE
(TOP 967.95)
STA 33+25S
EP 973.60
STA 33+50S
EP 973.65
STA 33+75S
EP 973.70
STA 34+00S
EP 973.75
STA 34+25S
EP 973.80
STA 34+50S
EP 973.85
STA 34+75S
EP 973.89
STA 35+00S
EP 973.94
STA 35+25S
EP 973.99
STA 35+50S
EP 974.04
STA 35+75S
EP 974.09
STA 36+00S
EP 974.14
STA 36+25S
EP 974.18
STA 36+50S
EP 974.23
STA 36+75S
EP 974.28
STA 37+00S
EP 974.33
STA 37+25S
EP 974.38
STA 37+50S
EP 974.43
STA 37+75S
EP 974.48
STA 38+00S
EP 974.52
STA 33+25S
FL 971.83
STA 33+50S
FL 971.90
STA 33+75S
FL 971.96
STA 34+00S
FL 972.03
STA 34+25S
FL 972.10
STA 34+50S
FL 972.16
STA 34+75S
FL 972.23
STA 35+00S
FL 972.30
STA 35+25S
FL 972.37
STA 35+50S
FL 972.43
STA 35+75S
FL 972.50
STA 36+00S
FL 972.57
STA 36+25S
FL 972.63
STA 36+50S
FL 972.70
STA 36+75S
FL 972.77
STA 37+00S
FL 972.83
STA 37+25S
FL 972.90
STA 37+50S
FL 972.97
STA 37+75S
FL 973.03
STA 38+00S
FL 973.10
S= 0.27%
S= 0.27%
S= 0.27%
S= 0.27%
S= 0.19%
S= 0.19%
S= 0.19%
WEST EDGE OF PAVEMENT AT A.C. DIKE
WEST EDGE OF PAVEMENT AT A.C. DIKE
EAST CURB AND GUTTER FLOWLINE
EAST CURB AND GUTTER FLOWLINE
EAST CURB AND GUTTER FLOWLINE
WEST EDGE OF PAVEMENT AT A.C. DIKE
INSTALL NEW SIDEWALK
DRAIN STRUCTURE PERDETAIL N ON SHEET 24
5 SOUTH IMPERIAL AVENUE PLAN AND PROFILE
FROM STATION 33+50S TO STATION 38+00S
STA 33 +50S STA 34 +00S STA 34 +50S STA 35 +00S STA 35 +50S STA 36 +00S STA 36 +50S STA 37 +00S STA 37 +50S STA 38 +00S SEE SHEET 4 FOR MATCHLINE
AT STA 33+50S
977976
975
974973972
971
970
969968
977976975974973
972
971
970969968
SEE SHEET 6 FOR MATCHLINE
AT STA 38+00S
PROFILE SCALE
HORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 5_IMPROVEMENT PLAN.dwg 06/10/2022 08:31 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
SOUTH IMPERIAL AVENUE ROW CENTERLINE
STA 33 +50S STA 34 +00S STA 34 +50S STA 35 +00S STA 35 +50S STA 36 +00S STA 36 +50S STA 37 +00S STA 37 +50S STA 38 +00S SOUTH IMPERIAL AVENUE EAST AND WEST FLOWLINE/EDGE OF PAVEMENT PROFILE SCALE HORIZONTAL:1" = 20' VERTICAL: 1" = 2'
SEE SHEET 5 FOR
PHASE II IMPROVEMENTS
MATCHLINE AT STA 38+00S
BEGIN AT STA 33+50S977 976 975 974 973 972
971
977976975974973972
971
C-C
C-C
5 9
967 967
INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCHWIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEEGENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR AHORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION. INSTALL NEW P.C.C. CURB AND GUTTER TO A.C. DIKE TRANSITION PER DETAIL T ON SHEET 25.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. AMINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL 3 INCHES OF A.C. PAVEMENT OVER 9 INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ONSHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL. 1 2
3 4
5 6
7 89
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
22 2324252627282930
31 323334
EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.
EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
22 20
19 273028
21 25
26313229
11 33343536373839404142434445
EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.
EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100.
EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.
EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.
EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&TDISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86.
2324
20 0 20 40 60
SCALE 1"= 20'
5 9
18.c
Packet Pg. 664
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SIGNAL
38+00S 39+00S 40+00S 4
SIGNAL
0+00E 1+00E
E
ROW
ROW
RIGHT OF WAY
110.00'
RIGHT OF WAY
ROW
DANENBERG
DRIVE
TRACT LINE
TOP OF SLOPE TOP OF
TOP OF SLOPE
AGRICULTURAL FIELD
6.00'
6.00'
7 10
23 18
26 IID DATE DRAIN
WATER
(18" SS)
(18" W) (18" W)
(18" SS)
4 7 7 7
PHASE II LIMITS OF
CONSTRUCTION
35 PHASE II LIMITS OF
CONSTRUCTION
S=0.27% S=0.27%
S=0.19%
S=0.19%
S=0.19%
S=2.00% S=2.00%
S=2.00% S=2.00% STA 40+91.58S TP 974.83 TP 974.87 STA 40+91.50S TC 974.21
FL 973.71
6.00'
38.00' 19.09'
ROW
ROW
ROW
SW 973.60 SW 974.15
1 1
1 1
1 6 6 6
5 5 5
26 12
12 18
18 18
4 4 4 4
7 6
18 37
25 25
5.00 5.00
EASEMENT
40'
STA 40+91.31S
26 26
5.00'
6.00'
26 EP 974.53 EP 974.67 EP 974.72 EP 974.77 EP 974.82
EP 974.86
EP 974.91
EP 974.96
EP 975.01
EP 975.06
TC 973.67
FL 973.17
TC 973.80
FL 973.30 TC 973.87
FL 973.37
TC 973.94
FL 973.44
TC 974.00
FL 973.50
TC 974.07
FL 973.57 TC 974.14
FL 973.64
SW 973.67 SW 973.80
SW 973.87
SW 973.94
SW 974.00
SW 974.07
S=0.27%
10 S=1.50%
S=1.50%
STA 40+65.
EXT. 18" W
(TOP EL. 968.55)
36 3
MATCHEXISTING
GRADE
6.00'
S/W
6.00'
S/W
38+50S 39+50S 40+50S
ROW CENTER LINE ROW CENTER LINE
19.09'
VARRIES
VARRIES
EP 974.62
38.00'
SOUTH IMPERIAL AVE.
EP 975.07
END OF A.C. DIKE
EP 974.57
SW 974.14 S=1.50%
STA 40+00.00S
STA 39+00.00S
SEE SHEET 5 FOR MATCHLINE
AT STATION 38+00S STA 38+00.00S STA 39+00.00S STA 40+00.00S TC 973.93
FL 973.43
MATCHEXISTING
GRADE
PHASE II LIMITS OF
CONSTRUCTION
MATCH
EXISTING
GRADE
MATCHEXISTING
GRADE
TOP 971.86
BOT 968.86
BOT 968.86
TOP 971.86
TOP 971.91
BOT 968.91
BOT 968.91
TOP 971.91
TOP 971.96
BOT 968.96
BOT 968.96
TOP 971.96
TOP 972.01
BOT 969.01
BOT 969.01
TOP 972.01
TOP 972.06
BOT 969.06
BOT 969.06
TOP 972.06
20 20 20
26 26 26 26
5' 5' 9' 9'
2'
10'
5' 5' 9' 9'
2'
10'
TOP OF SLOPE
TOP OF SLOPE
BOT. OF SLOPE BOT. OF SLOPE
TOP OF SLOPE
20 20
SW 973.69 SW 973.89 SW 974.21 SW 974.03
S=1:3
S=1:3
S=1:3
S=1:3
S=1:3
S=1:3
S=1:3
S=19.55%
S=19.55%
S=19.76%
S=21.97%
S=0.10% S=0.10% S=0.10% S=0.10%
TC 973.60
FL 973.10
STA 38+00.00S
TOP 972.08
STA 40+28.90 S
TOP 972.08
STA 40+19.89 S
31 LIMIT OF PAVEMENT SECTION
WTR MANH
(TMH 972.07) THG FI
(TOP OF PIPE 970.57) CA
(INV. 966.57) CA
25 10
10 3
5 STA 39+99.98S 21
STA 0+93.48E 21 PHASE II LIMITS OF CONSTRUCTION
SW 973.93
MATCHEXISTING
GRADE
SEE BLOW-UP
DETAIL 1 ON
PLAN SHEET 21. TOP OF SLOPE 22 22 22 22
12 12
5.00'
5.00'
1.00'
4 5.00'
5.00'
ROW ℄ ROW ℄ ROW ℄
5.5'
5.5'
5.5'
5.5'
23 23
2424
24 24
UE UE UE UE
UE
UE UE UE UE
22 24
UE
BC STA 40+54.34S
EC STA 40+29.67S
5 17
S= 0.27%
S= 0.27%
S= 0.27% STA 37+75S
TP 974.03
STA 38+00S
TP 974.09
STA 38+25S
TP 974.16
STA 38+50S
TP 974.23
STA 38+75S
TP 974.29
STA 39+00S
TP 974.36
STA 39+25S
TP 974.43
STA 39+50S
TP 974.49
STA 39+75S
TP 974.56
STA 40+00S
TP 974.63
STA 40+25S
TP 974.70
STA 40+50S
TP 974.76
STA 40+75S
TP 974.83
STA 41+00S
TP 974.90
STA 41+25S
(EG 973.27) (EG 973.22) (EG 973.32)
(EG 974.21)
(EG 975.00)
(EG 975.37)
(EG 974.00)
(EG 973.27)
EXISTING GRADE
EXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
TOP OF PAVEMENT
AT CENTERLINE TOP OF PAVEMENT AT CENTERLINE
EXISTING GRADE
EXISTING GRADE
41+21.5
STA 37+75S
EP 974.48
STA 38+00S
EP 974.52
STA 38+25S
EP 974.57
STA 38+50S
EP 974.62
STA 38+75S
EP 974.67
STA 39+00S
EP 974.72
STA 39+25S
EP 974.77
STA 39+50S
EP 974.82
STA 39+75S
EP 974.86
STA 40+00S
EP 974.91
STA 40+25S
EP 974.96
STA 40+50S
EP 975.01
STA 40+75S
EP 975.06
STA 41+00S
EP 975.11
STA 41+25S
STA 37+75S
FL 973.03
STA 38+00S
FL 973.10
STA 38+25S
FL 973.17
STA 38+50S
FL 973.23
STA 38+75S
FL 973.30
STA 39+00S
FL 973.37
STA 39+25S
FL 973.44
STA 39+50S
FL 973.50
STA 39+75S
FL 973.57
STA 40+00S
FL 973.64
S= 0.27%
S= 0.27%
S= 0.19%
S= 0.19% S= 0.19%
BC STA 40+56.34S
FL 973.43
EC STA 40+29.67S
FL 973.71
WEST EDGE OF PAVEMENT AT A.C. DIKE
EAST CURB AND GUTTER FLOWLINE
EAST CURB AND GUTTER FLOWLINE
CURB RETURN
WEST EDGE OF PAVEMENT AT A.C. DIKE
1+00S
PROPOSE
STA 41
F SLOPE
968.00
19 31
4 22
22 14
14 8
26 14
7 7
PP# PW-0301
PP#
OHE
OHE
(18" W)
7 34
25 NW CORNER
OF TRACT 84
TRACT LINE
25 ROW
0'
0'
END OF PHASE II CONSTRUCTION
AT STATION 41+96.58S
MATCHEXISTING
GRADE
HOLE
IELD
ALC.*
ALC.*
5.00'
11 11
5.00'
22 24
6 0' 20' 40' 60'
SCALE: 1"=20'
20'
SOUTH IMPERIAL AVENUE PLAN AND PROFILE
FROM STATION 38+00S TO STATION 40+96.58S
SEE SHEET 7 FOR PHASE II DANENBERG DR.
STA 38 +00S STA 38 +50S STA 39 +00S STA 39 +50S STA 40 +00S STA 40 +50S STA 41 +00S SEE SHEET 5 FOR MATCHLINE
AT STA 38+00S
979978977976975974973972
971
970
979978977976975
974
973
972
971
END OF PHASE II CONSTRUCTION 970
AT STA 40+96.58S
INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEE GENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR AHORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION. INSTALL NEW P.C.C. CURB AND GUTTER TO A.C. DIKE TRANSITION PER DETAIL T ON SHEET 25.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. AMINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL 3 INCHES OF A.C. PAVEMENT OVER 9 INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ONSHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL. 1 2
3 4
5 6789
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
22 23
24 252627282930
31 323334
PROFILE SCALEHORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 6_IMPROVEMENT PLAN.dwg 06/10/2022 11:00 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
SOUTH IMPERIAL AVENUE ROW CENTERLINE
SOUTH IMPERIAL AVENUE EAST AND WEST FLOWLINE/EDGE OF PAVEMENT PROFILE SCALE HORIZONTAL:1" = 20' VERTICAL: 1" = 2'
PHASE II IMPROVEMENTS
BEGIN AT STA 38+00S
979978977
976
975
974
973
972
979978977976975974973972
STA 38 +00S STA 38 +50S STA 39 +00S STA 39 +50S STA 40 +00S STA 40 +50S STA 41 +00S
END OF PHASE II
CONSTRUCTION AT STA
40+96.58S
18.c
Packet Pg. 665
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SIGNAL
40+00S S SD SIGNAL 0+00E 1+00E 2+00E 3+00E 4+00E
E
S=2.00%
6.5'
DANENBERG DR. STREET
CENTERLINE
TRACT LINE
TRACT LINE
38.0'
7 4
4 10
35 (18" SS) TC 973.93 FL 973.43 BC STA +66.91E S=0.70% S=0.70% S=2.00%
S=2.00% 6.5'
5.0'
PHASE II LIMITS OF
CONSTRUCTION
ROW ROW ROW ROW ROW
ROW ROW
TP 974.83
110.0'
S=0.70%
TC 974.21
FL 973.71
SW 97
S=2.00%
S=2.00%
S=2.00%
EC STA 0+41.32E
1 26
18 18
1 31
31 31 1
31 7
4 4 14 4
6 6 6
5 5 5 1
60.0'
ROW
℄
ROW TO BE
DEDICATED
EASEMENT
S=0.70%
ROW
℄
40'
EP 974.91
EP 974.96
EP 975.01
EP 975.06
SW 974.26
4 TC 973.52
FL 973.02
TC 973.35
FL 972.85
TC 973.17
FL 972.67 TC 973.00
FL 972.50
TC 972.82
FL 972.32
TC 972.65
FL 972.15
TC 972
FL 971.
SW 973.52 SW 973.35 SW 973.17 SW 973.00 SW 972.82
SW 972.42
SW 972.30
SW 972.24
SW 972.18
50.0'
S=0.24%
GRADE BREAK
STA 2+73.84E
TC 972.98
FL 972.48
SW 972.12
S=
(18" SS)
S=0.24%
TC 972.86
FL 972.36 TC 972.30
FL 971.80
TC 972.24
FL 971.74
TC 972.18
FL 971.68
GB
STA 2+73.84E
S=1.50%
16 16
STA 4+00.00E
4 10
10 TP 973.91 TP 973.56 TP 973.21
3 TP 974.26 3 TP 972.75 3 3
31 0+50E 1+50E 2+50E 3+50E
31.0'
S/W
S/W
STA 2+00.00E
S=0.70%
UE
S=0.27%
UE UE
UE
24 24
24 22
974 974
973
973
972
972
975
0+00E
3 0+50E TP 974.44
10 1+50E
STREET
CENTERLINE
TP 973.74 2+00E EP 973.39 2+50E TP 973.04 3+00E 3+50E 4+00E
5.0'
10.0'
6 TC 973.70
FL 973.20
STA 1+00.00E
31 1+00E TP 974.09
40+50
TC 972.12
FL 971.62
13 SD MANHOLE
STA 4+00E
TMH 972.43
N.INV 967.05
W.INV 966.85
38.0'
18"SD
SD=0.12%
18"SD
SD=0.12%
22 9'
2' 9'
10'
20 26
S IMPERIAL AVE.
STA 0+9.83 W
BEGIN HEADER BOARD
EP 975.09
18 7
LIMIT OFPAVEMENT
SECTION
22 25 25 TP 972.57 S=0.70% S=0.24%
℄ 5.0'
5.0'
5.0' EP 972.63
3 25 EP 972.81 EP 972.69
EP 972.51
25 ℄ 5.0'
R MATCHLINE AT STATION 4+50E
'
'
100.0'
'
100.0'
ROW
C2B 974.99 36
5.0'
PHASE II LIMITS OF
CONSTRUCTION
0 12
12 5.0'
12 MATCH
EXISTING
GRADE
11 RIGHT OF WAY
22 3.5'
PHASE II LIMITS OF
CONSTRUCTION
5.0'
MATCHEXISTING
GRADE
3.5'
11 11
PHASE II LIMITS OF
CONSTRUCTION
S=1.50%
SW 972.65 SW 972.36
MATCHEXISTING
GRADE
MATCHEXISTING
GRADE
RIGHT OF WAY
SD CATCH BASIN
TMH 972.18
S.INV 967.09
S=1.50%
S=1.50%STA 0+93.48E 21 21 STA 3+88.93E
TC 972.42
FL 971.92
TP 972.87
STA 3+00.00E
SW 972.48 17 6.0'
6.0'
6.0'
6.0'
23 W) (18" W) TP 974.6437
(18" W) 4
SW 974.00
ROW
SW 974.30
5 5
26 23
R25'
TP 972.45
STA 0+00E
TP 974.91
STA 0+25E
TP 974.66
STA 0+50E
TP 974.44
STA 0+75E
TP 974.26
STA 1+00E
TP 974.09
STA 1+25E
TP 973.91
STA 1+50E
TP 973.74
STA 1+75E
TP 973.56
STA 2+00E
TP 973.39
STA 2+25E
TP 973.21
STA 2+50E
TP 973.04
STA 2+75E
TP 972.87
STA 3+00E
TP 972.81
STA 3+25E
TP 972.75
STA 3+50E
TP 972.69
STA 3+75E
TP 972.63
STA 4+00E
TP 972.57
STA 4+25E
TP 972.51
STA 4+50E
GRADE BREAK
STA -0+06.87
TP 974.78
GRADE BREAK
STA 2+73.84
TP 972.87
S= 1.00%
S= 0.70%
S= 0.70%
S= 0.24% S= 0.24%
S= 0.12%
(EG 974.00)
(EG 974.77)
(EG 974.42) (EG 974.54) (EG 974.37)
(EG 974.36)
(EG 974.25)
(EG 974.14) (EG 974.22) (EG 974.10)
S= 0.52%
STA 1+25E
EP 973.19
STA 1+50E
EP 973.06
STA 1+75E
EP 972.93
STA 2+00E
EP 972.81
STA 2+25E
EP 972.68
STA 2+50E
EP 972.55
STA 2+75E
EP 972.42
STA 3+00E
EP 972.41
STA 3+25E
EP 972.39
STA 3+50E
EP 972.39
STA 3+75E
EP 972.36
STA 4+00E
EP 972.36
STA 4+25E
EP 972.34
STA 4+50E
EP 972.32
S= 0.06% S= 0.06% EXISTING GRADE
EXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
TOP OF PAVEMENT
AT CENTERLINE
TOP OF PAVEMENT
AT CENTERLINE
EXISTING GRADE
N.INV 967.05
W.INV 966.85
SD MANHOLE
STA 4+00E
TMH 972.43 INSTALL NEW STORM WATER MANHOLE PER
DETAIL F ON PLAN
SHEET 22.
INSTALL NEW 18- INCH DIA.
SDR 26 PVC PIPELINE
STREET SECTION IS5-INCHES OF A.C.
PAVEMENT OVER 18
INCHES OF CLASS 2
BASE.
STREET SECTION IS7-INCHES OF A.C.
PAVEMENT OVER 26
INCHES OF CLASS 2
BASE.
SOUTH IMPERIAL
AVENUE RIGHT-OF-WAY
CENTERLINE.
SOUTH EDGE OF
PAVEMENT
SOUTH EDGE OF
PAVEMENT SOUTH EDGE OF PAVEMENT
GRADE BREAK
STA 0+66.91E
FL 973.43
STA 0+50E
FL 973.62
STA 0+75E
FL 973.37
STA 1+00E
FL 973.20
STA 1+25E
FL 973.02
STA 1+50E
FL 972.85
STA 1+75E
FL 972.67
STA 2+00E
FL 972.50
STA 2+25E
FL 972.32
STA 2+50E
FL 972.15
STA 2+75E
FL 971.98
STA 3+00E
FL 971.92
STA 3+25E
FL 971.86
STA 3+50E
FL 971.80
STA 3+75E
FL 971.74
STA 4+00E
FL 971.68
STA 4+25E
FL 971.62
STA 4+50E
FL 971.56
GRADE BREAK
STA 0+41.32E
FL 973.720
GRADE BREAK
STA 2+73.84E
FL 971.978 S= 0.70% S= 0.70%
S= 0.24%
S= 0.24%
S= 0.70%
NORTH CURB AND GUTTER FLOWLINE
NORTH CURB AND GUTTER FLOWLINE
S.INV 967.09
SD CATCH BASINSTA 4+00E
TMH 972.18
INSTALL NEW STORM
WATER CATCH BASIN
PER DETAIL J ON PLAN
SHEET 23.
CURB RETURN
SS
E
SIGNAL
41+00S
PROPOSED IID POWER POLE
EXISTING 48" RAW
WATER PIPELINE TO
CITY OF EL CENTRO
WTP TRACT LINE TRACT LINE TRACT LINE
TRACT LINE
TRACT CORNER- NO
PHYSICAL MONUMENT
POTHOLE DTD 12-09-2015
STA 1+87.50E
(TOP OF PIPE EL. 968.53)
20.0'
21 2
4 4
7 7
7 5 14
14 15
27 28 17
17 33
33 33
8 27
14 14
7 PP# 1111378D PP# T4197D
(18" W)
PP# PW-0301
OHE
OHE
E
OHE
OHE
O
(18" W) (18" W)
ROW
FLOW
℄
(18" W)
22 24
RIGHT OF WAY
RIGHT OF WAY
E
ROW
ROW ROW ROW ROW
OHE
34.5'
ABANDONED ELECTRICAL
SERVICE POLE
EXISTING CATHODIC
PROTECTION SYSTEM
ELECTRICAL PAD
CITY OF EL CENTRO WATER TREATMENT PLANT
23 ROW
PHASE II LIMITS OF
CONSTRUCTION
3 28.4' 3
30.0'
SEE SHEET 8 FOR MATCH EXISTING GRADE EP 972.57 PHASE II LIMITS OF CONSTRUCTION PHASE II LIMITS OF CONSTRUCTION
50.0'
5.0'
5.0'
5.0'
11 11 C2B 973.64 C2B 973.29 C2B 972.94 11 C2B 972.71 C2B 972.59 C2B 972.47
30.0'
15.2'
MATCH
EXISTING
GRADE
30.0' 11
5.0'
℄
C2B 974.34 C2B 973.99
40+50
ELECTRICAL BOX
STA 0+81.49E
EXISTING IID POWER POLE AND GUY
WIRES TO BE RELOCATED BY IID POWER
DIVISION PRIOR TO THE COMMENCEMENT
OF CONSTRUCTION ACTIVITIES.
(18" W
10'
UE
UE
PP# 1111377D
7 DANENBERG DRIVE PLAN AND PROFILE FROM
STATION 0+00E TO STATION 4+50E
STA 0 +00 STA 0 +50 STA 1 +00 STA 1 +50 STA 2 +00 STA 2 +50 STA 3 +00 STA 3 +50 STA 4 +00 STA 4 +50
DANENBERG DRIVE ROW CENTERLINE / SOUTH EDGE OF PAVEMENT SEE SHEET 8 FOR MATCHLINE AT STA 4+50E
SEE SHEET 6 FOR SOUTH
IMPERIAL AVENUE
977976975
974
973
972
971
970969968967966
977976975974973
972
971
970969968967966
PROFILE SCALE
HORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
SEE SHEET 6 FOR SOUTH IMPERIAL AVENUE
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 7_IMPROVEMENT PLAN.dwg 06/10/2022 11:06 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEE GENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR A HORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION. INSTALL NEW P.C.C. CURB AND GUTTER TO A.C. DIKE TRANSITION PER DETAIL T ON SHEET 25.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. A MINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL 3 INCHES OF A.C. PAVEMENT OVER 9 INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ON SHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL. 1 2
3 4
5 6789
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
222324
25 2627
282930
31 323334
EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.
EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
22 20
19 273028
21 25
26313229
11 33343536373839404142434445
EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.
EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100.
EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.
EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.
EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&TDISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86.
2324
STA 0 +00 STA 0 +50 STA 1 +00 STA 1 +50 STA 2 +00 STA 2 +50 STA 3 +00 STA 3 +50 STA 4 +00 STA 4 +50
DANENBERG DRIVE NORTH FLOWLINE
SEE SHEET 8 FOR MATCHLINE AT STA 4+50E
SEE SHEET 6 FOR SOUTH
IMPERIAL AVENUE
977976975
974
973
972
971
970969968967
977976975974973972
971
970969968967
PROFILE SCALE
HORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
D-D
7 D-D
7 10
10 20 0 20 40 60
SCALE 1"= 20'
SEE HANDICAP
RAMP BLOW-UP
DETAIL 1 ONPLAN SHEET 21.
18.c
Packet Pg. 666
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) S=0.05%
SD
SS SS
SD
5+00E 6+00E 7+00E 8+00E 9+00E
6.5' 5.0'
S=0.24% S=0.24%
S=0.24%
S=2.00%
S=2.00%
ROW ROW ROW ROW
(UG) (UG) (UG) SW 972.06
TC 971.82
FL 971.32
TC 971.76
FL 971.26 TC 971.38 FL 970.88
SW 971.94
SW 971.88 SW 971.82 SW 971.70 SW 971.64 SW 971.58
EP 972.33 EP 972.27 EP 972.21 EP 972.15
TC 971.58
FL 971.08
(FL EL. 970.76)
STA 6+70.00E
5'
6 31
5 5
6 4
31 14
16 16
13 S/W
16 32.3'
3 EP 972.39 9
3 38.0'
3 SW 971.76
MATCH
EXISTING
GRADE
PHASE II LIMITS OF
CONSTRUCTION
4 TC 972.06
FL 971.56
S=2.00%
SW 972.00 6
TC 972.00
FL 971.50
TC 971.94
FL 971.44
STA 5+00.00E
TC 971.88
FL 971.38
TC 971.70
FL 971.20
S=0.24%
TC 971.64
FL 971.14
EP 972.03
16 STA 6+84.39E 31
5 3
ROW
RIGHT OF WAY 3.5'
(SW EL. 970.37)(SW EL. 970.47)
4 DANENBERG DR.
5+00E 6+00E S=0.24%
2 1
2 3
5 4
6 6 6 9 12
16 16
32 3
22 7
4 1
1 43 43 43 43
4 6
8 41
39 40 42
3 7
2 13
SD MANHOLE
STA 6+70E
TMH 971.76
N.INV 966.62
E. INV 966.42W.INV 966.52
SD CATCH BASIN
STA 6+70E
TMH 971.38
S.INV 966.66
SD=0.12%
SD=0.12% SD=0.12%
18"SD 18"SD 18"SD 18"SD
STA 6+00.00E
2 25 EP 972.09 EP 971.97 25 5.0'
FACE OF CURB TO
STREET CENTERLINE
100.0'
GB
30.9'
℄ GB ℄
START TRANSITION
TO EXISTING A.C.
PAVEMENT
GRADE BREAK
STA 6+50E
℄
5+50E
(EP EL. 971.89)
℄
C2B 972.35
OF EXISTNG 48 INCH RAW WATER PIPELINE
C2B 972.23 C2B 972.11 C2B 971.99 C2B 971.87
HEET 7 FOR
CHLINE AT
TION 4+50E 11 5.0'
5.0'
5+00E 6+00E 7+00E 8+00E 9+00E
PHASE II LIMITS OF
CONSTRUCTION
31 PHASE II LIMITS OF
CONSTRUCTION
16 7+50E
3' 31
8+50E
4.84' PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
16 31
8 11
34 11'
9'
11'
13'
25 EP 972.45 25
PHASE II LIMITS OF
RIGHT OF WAY CONSTRUCTION
MATCH
EXISTING
GRADE
11 11
S=1.50%
S=1.50%
℄
(8"W)
(8"SS)
(8"W)
(8"SS)
31 35
33 ℄OF EXISTNG 48 INCH RAW WATER PIPELINE
33 11
STA 6+82 30E
STA 4+50E
TP 972.45
STA 4+75E
TP 972.39
STA 5+00E
TP 972.33
STA 5+25E
TP 972.27
STA 5+50E
TP 972.21
STA 5+75E
TP 972.15
STA 6+00E
TP 972.09
STA 6+25E
TP 972.03
STA 6+50E
TP 971.97
STA 6+75E
TP 971.91
S= 0.24%
GRADE BREAK
STA 6+90.00
TP 971.87
S= 0.24%
= 0.12%
S= 0.12% S= 0.12%
S= 0.12%
(EG 974.10)
(EG 973.75) (EG 973.96) (EG 973.81)
(EG 972.00)
(EG 971.74)
(EG 971.55) (EG 971.43) (EG 971.34) (EG 971.24) (EG
STA 4+25E
EP 972.34
STA 4+50E
EP 972.32
STA 4+75E
EP 972.31
STA 5+00E
EP 972.29S= 0.06%
EXISTING GRADE
TOP OF PAVEMENT
AT CENTERLINE
N.INV 966.52
E. INV 966.42
W.INV 966.52
SD MANHOLE
STA 6+70E
TMH 971.76
EX.SD MANHOLE
STA 9+24.65E
TMH 970.87
EXISTING GRADE
EXISTING GRADE
INSTALL NEW 18-INCH DIA. SDR 26 PVC STORMWATER PIPELINE INSTALL NEW 18-INCH DIA. SDR 26 PVC STORMWATER PIPELINE STA 4+25E
FL 971.62
STA 4+50E
FL 971.56
STA 4+75E
FL 971.50
STA 5+00E
FL 971.44
STA 5+25E
FL 971.38
STA 5+50E
FL 971.32
STA 5+75E
FL 971.26
STA 6+00E
FL 971.20
STA 6+25E
FL 971.14
STA 6+50E
FL 971.08
STA 6+75E
FL 970.83
GRADE BREAK
STA 6+50.00E
FL 971.075
GRADE BREAK
STA 6+82.30E
FL 970.760
%
S= 0.24% S= 0.24%
S= 0.98%
NORTH CURB AND GUTTER FLOWLINE
INSTALL NEW STORM DRAIN CATCH
BASIN PER DETAIL J ON SHEET 23.
S.INV 966.66
SD CATCH BASIN
STA 6+70E
TMH 971.38
FL 970.88
8.0'
PP# 200183 PP# 200184 PP# 200185 PP# 1111702D PP# 1197007D (18" W)
OHE OHE
PP# 200182
(18" W) (18" W)
RIGHT OF WAY RIGHT OF WAY
ROW ROW ROW ROW ROW
TRACT LINE
STA 9+13.79E PHASE II LIMITS OF
CONSTRUCTION
TRACT LINE
OHE
TRACT LINE
14 21 21 10 10
10 20
7 7
17 33 33
14 14
14 33 14
22 MATCH
EXISTING
GRADE
EX.SD MANHOLE
STA 9+24.65E
TMH 970.87
E. INV 965.56W.INV 965.66
℄ STREET
CENTERLINE
PHASE II LIMITS OF
CONSTRUCTION
MATCH
EXISTING
GRADE
OF EXISTNG 48-INCH RAW WATER PIPELINE 22
SEE S
MATC
STAT11 11
℄ ℄OF EXISTNG 48-INCH RAW WATER PIPELINE
NEW SS MH
STA 6+77.68E
TMH 971.42
E. INV 964.50
(W.INV 964.45±)
STA 6+82.30E
8 DANENBERG DRIVE PLAN AND PROFILE
FROM STATION 4+50E TO STATION 8+00E
DANENBERG DRIVE ROW CENTERLINE / SOUTH OF THE PAVEMENT
END OF PHASE II
ROAD IMPROVEMENTS
SEE SHEET 7 FOR
MATCHLINE AT STA 4+50E
977976975974973
972
971
970969968967966
977976975974973
972
971
970969968967966
PROFILE SCALEHORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
END OF PHASE II PROJECT LIMITS STA 9+50E
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 8_IMPROVEMENT PLAN.dwg 06/10/2022 08:43 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEEGENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR AHORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIESSHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. A MINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL NEW SANITARY SEWER MANHOLE PER THE CITY OF EL CENTRO DETAIL DWG. NO. EC-610 AS ILLUSTRATED IN DETAIL U ON PLAN SHEET 25. PLACE A 20-FOOT LONG, 8-INCH DIAMETER STUB-OUT PIPELINE WITH AN END CAP, EXTENDING WESTERLY FROM THE MANHOLE. INSTALL THE INVERT OF THE NEW STUB OUT ½- INCH HIGHER THAN THE EXISTING EAST INVERT ELEVATION AND MAINTAIN A 0.33% SLOPE.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ONSHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL.
INSTALL A BLOW-OFF ASSEMBLY AT THE END OF THE EXISTING 8-IN WATER PIPELINE PER DETAIL V ON PLAN SHEET 25. 1 2
3 4
5 6789
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
222324252627282930
31 32
33 34
35 STA 5 +00E STA 5 +50E STA 6 +00E STA 6 +50E STA 7 +00E
DANENBERG DRIVE NORTH FLOWLINE
END OF PHASE II
ROAD IMPROVEMENTS
SEE SHEET 7 FOR
MATCHLINE AT STA 4+50E
977976975974973
972
971
970969968967966
PROFILE SCALEHORIZONTAL:1" = 20'
VERTICAL: 1" = 2'
STA 4 +50E
E-E
8 10
E-E
8 10
977976975974973972
971
970969968967966
E. INV 965.56
(W.INV 965.66)
EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.
EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
22 20
19 273028
21 25
26313229
11 33343536373839404142434445
EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.
EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100.
EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.
EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.
EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&TDISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86.
2324
20 0 20 40 60
SCALE 1"= 20'
STA 4 +50E STA 5 +00E STA 6 +00E STA 7 +00E STA 8 +00E STA 9 +00E STA 5 +50E STA 6 +50E STA 7 +50E STA 8 +50E
18.c
Packet Pg. 667
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) TRACT
℄ LINE
ROW
WEST
ROW
EAST
ROW
55.00' 55.00'
5.00' 50.00'
40.00' NTS
43.00' 5.50' 6.00'
0.50'
1.67'
5.00'
7"
7"
7"
26"
26"
INSTALL 7 INCHES OF
A.C. PAVEMENT.
EXISTING NATIVE
MATERIAL
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE 4"
4"
43.00'
(NS 972.85)
0.50'
1.67'
TC 971.30
EP 970.97
TC 971.79
PHYSICAL ROAD
CENTERLINE
EP 970.97
TC 971.30
7.14'
INSTALL 4-INCH P.C.C. SIDEWALK WITH
THICKENED EDGES PER DETAIL D ON SHEET 22.
INSTALL 4 INCHES OF GRANULAR SAND
BENEATH THE P.C.C. SIDEWALK. COMPACT
THE GRANULAR SAND TO 95 PERCENT OF
MAXIMUM DENSITY PER ASTM D-1557.
(NS 973.19)
(NS 972.49)
3:1 MAX S=2.0% (NS 973.02) S=2.0% S=1.5% S=3.9% (NS 971.16)
ROW TO CL ROW TO CL
CL TO TL ROW TO TL
12"
12"
12.00'
SW 971.39
INSTALL NEW CATCH BASINPER DETAIL J ON SHEET 23.
INSTALL NEW CATCH BASIN
PER DETAIL J ON SHEET 23.
INV 960.45
INSTALL NEW 12-INCH DIAMETER PS
115 PVC STORM DRAIN PIPELINE
PER TRENCH DETAIL I ON SHEET 23.
INSTALL NEW 18-INCH DIAMETER PS
115 PVC STORM DRAIN PIPELINE PER
TRENCH DETAIL I ON SHEET 23.
SCARIFY THE TOP 12 INCHES OF SUB-GRADE
MATERIAL BENEATH A.C. PAVEMENT AREAS.MOISTURE CONDITION THE NATIVE MATERIAL TO OPTIMUM MOISTURE CONTENT AND COMPACT TO 95
PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
30.22'
86.0'
INSTALL 26 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASEMATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 6 INCHES OF CLASS 2 BASE.
COMPACT THE CLASS 2 BASE TO 95
PERCENT OF MAXIMUM DENSITYPER ASTM D-1557.
STORM DRAIN PIPELINE 26.5' NTS
EASEMENT
INV 959.81
EXISTING 21-INCH DIAMETER
SANITARY SEWER PIPELINE
TO REMAIN.
INV 956.91
TOP 971.00
PARKWAY
INV 957.01
GRADE NATIVE MATERIAL FOR DISTANCE OF 5 FEET FROM
FROM THE TOP OF THE NEW STORM WATER SWALE TO
DAYLIGHT. COMPACT THE NATIVE MATERIAL TO 90 PERCENT
MAXIMUM DENSITY PER ASTM D-1557.
10.00' NTS 20.00' STORM WATER SWALE
TOP 971.00
5' NTS
5' NTS
INSTALL NATIVE MATERIAL BACKING 1-INCH BELOW THE TOP OF P.C.C. SIDEWALK. EXTEND THE NATIVE MATERIAL BACKING FOR ADISTANCE OF 10 FEET FROM THE BACK OF SIDEWALK TO THE TOP OF THE NEW STORM WATER SWALE. COMPACT THE NATIVE MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
10.00' NTS
26"
12"
12"
12"
12"
INSTALL NEW 12-INCH DIAMETER PS
115 PVC STORM DRAIN PIPELINE
PER TRENCH DETAIL I ON SHEET 23.
STORM DRAIN PIPELINE
SCARIFY THE TOP 12 INCHES OF SUB-GRADE MATERIAL BENEATH A.C. PAVEMENT AREAS. MOISTURE CONDITION THE NATIVE MATERIAL TO OPTIMUM MOISTURE CONTENTAND COMPACT TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
27.65'
INSTALL 7 INCHES OF
A.C. PAVEMENT.
EXISTING 18-INCH DIAMETER CML
STEEL WATER PIPELINE TO REMAIN.
S=4.0%
S=4.0%
EXISTING NATIVE 9.00'
SURFACE
INV 960.55
STORM DRAIN
PIPELINE
18"
SW 971.30
(NS 971.06)
S=3:1
FUTURE 18-INCH DIA. WATER
PIPELINE. EXACT HORIZONTAL
LOCATION AND DEPTH SHALL BE
DETERMINED IN THE FUTURE.
5' NTS
INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND ANCILLARY ITEMS PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT POWER DIVISION. THE CONSTRUCTION OF THE IID’S ELECTRICAL FACILITIES SHALL BE COMPLETED IN ACCORDANCE WITH THE IID’S REQUIREMENTS UNDER IID’S SUPERVISION. A MINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID’S FACILITIES TO THE CITY INFRASTRUCTURE.
18.50'
℄
℄
2.00' 9.00'
EL.968.00
REMOVE AND DISPOSE OF EXISTING NATIVE MATERIAL TO FINISH GRADE TO
CONSTRUCT SWALE PER THE FLOWLINE ELEVATIONS, FLOWLINE SLOPE AND SIDE SLOPES AS ILLUSTRATED ON PLANS. MOISTURE CONDITION AND COMPACT THE FINISH SURFACE TO 90% OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 26 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASEMATERIAL TO 95 PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. ℄
INSTALL NEW STORM
WATER DROP INLET PER
DETAIL Q ON SHEET 24.
12-INCH DIAMETER PS 115 PVC
S=3.0% S=3.0%
EXISTING NATIVE
SURFACE
S=4.0%
TOP 958.48
12-INCH DIAMETER PS115 PVC
12"
S=3:1
12-INCH DIAMETER PS 115 PVC
INSTALL NEW 12-INCH
DIAMETER IN-LINE
DUCKBILL CHECK VALVE.
INV 961.27
GRATE
25.0' ± NTS
TBD
3.5' ±
TRACT
℄ LINE
ROW
WEST
ROW
EAST
ROW
55.00' 55.00'
5.00' 50.00'
40.00'
5.00'
5"
3"
3"
28.46' (VARIES) 38.00' 6.00'
0.50'
1.67'
10.00'
7"
7"
7"
26"
26"
26"
EP 974.43
TC 974.91 (NS 974.09)
EP 973.13
FL 972.97
TP 973.86
INSTALL NATIVE MATERIAL BACKING FLUSH WITH THE
NEW A.C. PAVEMENT AT THE BOTTOM OF THE NEW A.C.
DIKE. EXTEND THE NATIVE MATERIAL BACKING FOR A
DISTANCE OF 5 FEET FROM THE EDGE OF PAVEMENT TO
DAYLIGHT. COMPACT THE NATIVE MATERIAL TO 90
PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. INSTALL 6-INCH A.C. DIKE PER DETAIL M ON SHEET 23. INSTALL 7 INCHES OF A.C. PAVEMENT.
INSTALL 7 INCHES OF
A.C. PAVEMENT.
INSTALL 6-INCH P.C.C.
CURB AND GUTTER PER
DETAIL C ON SHEET 22.
INSTALL 26 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASE
MATERIAL TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
INSTALL 26 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASEMATERIAL TO 95 PERCENT OF MAXIMUMDENSITY PER ASTM D-1557.
EXISTING NATIVE
MATERIAL
EXISTING NATIVE
MATERIAL
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
(NS 974.01)
(NS 972.88) (NS 972.00) (NS 972.10) (NS 972.07)
4"
4"S=2.0% S=2.0% S=1.5% 3:1 MAX
5.50'
INSTALL NATIVE MATERIAL 1-INCH BELOW THE TOP OF P.C.C. CURB AND GUTTER AND THE TOP P.C.C. SIDEWALK. COMPACT THE NATIVE
MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 4 INCHES OF GRANULAR SAND.
COMPACT THE GRANULAR SAND TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM D-1557.
EXISTING NATIVE
SURFACE
SCARIFY THE TOP 12 INCHES OF SUB-GRADE MATERIAL
BENEATH A.C. PAVEMENT AREAS. MOISTURE CONDITION THE
NATIVE MATERIAL TO OPTIMUM MOISTURE CONTENT AND
COMPACT TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM
D-1557.
SCARIFY THE TOP 12 INCHES OF SUB-GRADE
MATERIAL BENEATH A.C. PAVEMENT AREAS. MOISTURE
CONDITION THE NATIVE MATERIAL TO OPTIMUM
MOISTURE CONTENT AND COMPACT TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM D-1557.
(NS 972.00)
INSTALL 6 INCHES OF CLASS 2 BASE. COMPACT
THE CLASS 2 BASE TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
ROW TO CL ROW TO CL
CL TO TL ROW TO TL
12"
12"
12"
EASEMENT
PARKWAY
TC 973.47
SW 973.47
℄
20.00'
9.00' 2.00' 9.00'
S=3:1
S=3:1
5.00'
INSTALL NEW ELECTRICAL UNDERGROUND
CONDUIT(S) AND ANCILLARY ITEMS PER THE
DRAWINGS AND SPECIFICATIONS PREPARED BY
THE IMPERIAL IRRIGATION DISTRICT POWER
DIVISION. THE CONSTRUCTION OF THE IID’SELECTRICAL FACILITIES SHALL BE COMPLETED IN ACCORDANCE WITH THE IID’S REQUIREMENTS
UNDER IID’S SUPERVISION. A MINIMUMHORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID’S
FACILITIES TO THE CITY INFRASTRUCTURE.
5.00'
℄
FUTURE 18-INCH DIA.
WATER PIPELINE
20.0'
INSTALL NATIVE MATERIAL BACKING 1-INCH BELOW THE
TOP OF P.C.C. SIDEWALK. EXTEND THE NATIVE MATERIAL
BACKING FOR A DISTANCE OF 10 FEET FROM THE BACK
OF SIDEWALK TO THE TOP OF THE NEW STORM WATERSWALE. COMPACT THE NATIVE MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
MATCH EXISTINGNATIVE SURFACE.
GRADE NATIVE MATERIAL FOR DISTANCE OF
5 FEET FROM FROM THE TOP OF THE NEWSTORM WATER SWALE TO DAYLIGHT.COMPACT THE NATIVE MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTMD-1557. STORM WATER SWALE
REMOVE AND DISPOSE OF EXISTING NATIVE MATERIAL TOFINISH GRADE TO CONSTRUCT SWALE PER THE FLOWLINEELEVATIONS, FLOWLINE SLOPE AND SIDE SLOPES AS ILLUSTRATED ON PLANS. MOISTURE CONDITION AND
COMPACT THE FINISH SURFACE TO 90% OF MAXIMUM
DENSITY PER ASTM D-1557.
EXISTING NATIVE
SURFACE
INSTALL 4-INCH P.C.C. SIDEWALK WITH
THICKENED EDGES PER DETAIL D ON SHEET 22.
TOP 971.81
BOT 968.81
BOT 968.81
TOP 971.81
SW 973.56
S=17.5%
EXISTING 18-INCH DIAMETER CML
STEEL WATER PIPELINE TO REMAIN.
EXISTING NATIVE
SURFACE
TRACT
℄ LINE
ROW
WEST
ROW
EAST
ROW
55.00' 55.00'
5.00' 50.00'
40.00'
43.00' 5.50' 6.00'
0.50'
1.67'
10.00'
7"
7"
7"
26"
26"
26"
GRADE THE EXISTING NATIVE MATERIAL
1-INCH BELOW THE TOP OF P.C.C. CURB AND
GUTTER. EXTEND THE NATIVE MATERIAL
GRADING FOR A DISTANCE OF 5 FEET FROM
BACK OF CURB TO DAYLIGHT. COMPACT THE
NATIVE MATERIAL TO 90 PERCENT OF
MAXIMUM DENSITY PER ASTM D-1557. INSTALL 7 INCHES OF A.C. PAVEMENT. INSTALL 7 INCHES OF A.C. PAVEMENT.
INSTALL 6-INCH P.C.C.
CURB AND GUTTER PER
DETAIL C ON SHEET 22.
INSTALL NATIVE MATERIAL 1-INCH BELOW THE TOP OF P.C.C. CURB AND GUTTER AND THE TOP P.C.C. SIDEWALK. COMPACT THE NATIVE
MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
EXISTING NATIVE
MATERIAL
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
4"
4"
43.00'
0.50'
1.67'
PHYSICAL ROAD
CENTERLINE
5.00'
INSTALL 4 INCHES OF GRANULAR SAND.
COMPACT THE GRANULAR SAND TO 95 PERCENTOF MAXIMUM DENSITY PER ASTM D-1557.
SCARIFY THE TOP 12 INCHES OF SUB-GRADE MATERIAL BENEATH A.C. PAVEMENT AREAS. MOISTURE CONDITION THE NATIVE
MATERIAL TO OPTIMUM MOISTURE CONTENT AND COMPACT TO
95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 26 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASEMATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 26 INCHES OF CLASS 2 BASE MATERIAL.
COMPACT THE CLASS 2 BASE MATERIAL TO 95
PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
3:1 MAX
ROW TO CL ROW TO CL
CL TO TL ROW TO TL
12"
12"
12"
INSTALL 6-INCH P.C.C. CURB AND
GUTTER PER DETAIL C ON SHEET 22.
INSTALL 6 INCHES OF CLASS 2 BASE. COMPACT
THE CLASS 2 BASE TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
7"
26"
(NS 973.49)
TC 973.65 FL 973.15
EP 973.32 TP 972.49
EP 971.66
FL 971.50
TC 972.00
SW 972.00
SW 972.09
(NS 974.15)
(NS 973.56)
(NS 972.37)
(NS 971.38)
(NS 971.77)
(NS 971.40)
(NS 970.95)
EASEMENT
PARKWAY
S=2.0%
S=2.0% S=1.5% S=8.3%
20.00'
9.00' 2.00' 9.00'
S=3:1
S=3:1
5.00'
INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND ANCILLARY ITEMS PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT POWER DIVISION. THE CONSTRUCTION OF THE IID’S ELECTRICAL FACILITIES SHALL BE COMPLETED IN ACCORDANCE WITH THE IID’S REQUIREMENTS UNDER IID’S SUPERVISION. A MINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID’S FACILITIES TO THE CITY INFRASTRUCTURE.
5.00' ℄
FUTURE 18-INCH DIA.
WATER PIPELINE ℄ 25.0'
INSTALL NATIVE MATERIAL BACKING 1-INCH BELOW THE TOP OF P.C.C. SIDEWALK. EXTEND THE NATIVE MATERIAL BACKING FOR A DISTANCE OF 10 FEET FROM THE BACK OF SIDEWALK TO THE TOP OF THE NEW STORM WATER SWALE. COMPACT THE NATIVE MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 4-INCH P.C.C. SIDEWALK WITH
THICKENED EDGES PER DETAIL D ON SHEET 22.
TOP 971.26
BOT 968.26
BOT 968.26 (NS 970.97)
MATCH EXISTINGNATIVE SURFACE.
GRADE NATIVE MATERIAL FOR DISTANCE OF 5 FEET FROM FROM THE TOP OF THE NEW STORM WATER SWALE TO DAYLIGHT. COMPACT THE NATIVE MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
STORM WATER SWALE
TOP 971.26
REMOVE AND DISPOSE OF EXISTING NATIVE MATERIAL TO FINISH GRADE TO
CONSTRUCT SWALE PER THE FLOWLINE ELEVATIONS, FLOWLINE SLOPE AND SIDE SLOPES AS ILLUSTRATED ON PLANS. MOISTURE CONDITION AND COMPACT THE FINISH SURFACE TO 90% OF MAXIMUM DENSITY PER ASTM D-1557.
SCARIFY THE TOP 12 INCHES OF SUB-GRADE
MATERIAL BENEATH A.C. PAVEMENT AREAS. MOISTURE
CONDITION THE NATIVE MATERIAL TO OPTIMUM
MOISTURE CONTENT AND COMPACT TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM D-1557.
EXISTING 18-INCHDIAMETER CML
STEEL WATER
PIPELINE TO REMAIN.
INSTALL 6 INCHES OF CLASS 2 BASE.
COMPACT THE CLASS 2 BASE TO 95 PERCENTOF MAXIMUM DENSITY PER ASTM D-1557.
EXISTING NATIVE
MATERIAL
29.71'
HIGH WATER
LEVEL
EL. 962.13
S=0.6%
(NS 963.61)
WATER
SURFACE
EL. 959.00
BOT 957.23
INV 956.73
INSTALL ONE (1) 7.5 FEET LONG
SECTION OF 18-INCH DIAMETER
RCP DISCHARGE PIPE.
EXISTING IID
DATE DRAIN
INV 956.73
9 SOUTH IMPERIAL AVENUE SECTION DETAILS
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 9-10_SECTION DETAILS.dwg 06/10/2022 08:50 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 SOUTH IMPERIAL AVENUE SECTION DETAIL AT STATION 29+40SSCALE: 1" = 5' HORIZONTAL 1" = 5' VERTICAL
SOUTH IMPERIAL AVENUE SECTION DETAIL AT STATION 37+50SSCALE: 1" = 5' HORIZONTAL 1" = 5' VERTICAL
SOUTH IMPERIAL AVENUE SECTION DETAIL AT STATION 32+00SSCALE: 1" = 5' HORIZONTAL 1" = 5' VERTICAL
A-A
4 9
B-B
4 9
C-C
5 9
INSTALL NEW 12-INCH DIAMETER PS
115 PVC STORM DRAIN PIPELINE PER
TRENCH DETAIL I ON SHEET 23.
GRADE THE EXISTING NATIVE MATERIAL FROM THE BACK
OF P.C.C. CURB AND GUTTER / CATCH BASIN. EXTEND THE
NATIVE MATERIAL GRADING FOR A DISTANCE OF 5 FEET
FROM BACK OF CURB / CATCH BASIN TO DAYLIGHT.
COMPACT THE NATIVE MATERIAL TO 90 PERCENT OF
MAXIMUM DRY DENSITY PER ASTM D-1557.
INSTALL A NON-SHRINK GROUT TO
SEAL THE VOID AT THE CONNECTION
BETWEEN THE 12-INCH DIA. PVC
PIPELINE AND THE 18-INCH DIA. RCPPIPELINE.
18.c
Packet Pg. 668
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) ℄
ROW
NORTH
ROW
SOUTH
ROW
50.00' 50.00'
38.00' 6.00' 5.00'
0.50' 0.50'
1.67'
3.50'
ROW TO CL ROW TO CL
TRACT
LINE
INSTALL 5 INCHES OF
A.C. PAVEMENT.
5"
18"
5"
18"
12"
12"
INSTALL 18 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASE
MATERIAL TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
SCARIFY THE TOP 12 INCHES OF
SUB-GRADE MATERIAL BENEATH A.C.
PAVEMENT AREAS. MOISTURE
CONDITION THE NATIVE MATERIAL TO
OPTIMUM MOISTURE CONTENT AND
COMPACT TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
EXISTING
NATIVE
MATERIAL
INSTALL 6-INCH P.C.C. CURB AND
GUTTER PER DETAIL C ON SHEET
22. INSTALL 6 INCHES OF CLASS 2 BASE. COMPACT
THE CLASS 2 BASE TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
INSTALL 4 INCHES OF GRANULAR SAND.
COMPACT THE GRANULAR SAND TO 95 PERCENTOF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NATIVE MATERIAL 1-INCH BELOW THE TOP OF P.C.C. CURB AND GUTTER AND THE TOP P.C.C. SIDEWALK. COMPACT THE NATIVE
MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
GRADE THE EXISTING NATIVE MATERIAL 1-INCH BELOW
THE TOP OF P.C.C. SIDEWALK. EXTEND THE NATIVE
MATERIAL GRADING FOR A DISTANCE OF 3.5 FEET FROMBACK OF SIDEWALK TO DAYLIGHT. COMPACT THENATIVE MATERIAL TO 90 PERCENT OF MAXIMUMDENSITY PER ASTM D-1557.
INSTALL 4-INCH P.C.C. SIDEWALK WITH
THICKENED EDGES PER DETAIL D ON SHEET 22.
EXISTING
NATIVE
MATERIAL
EXISTING
NATIVE
MATERIAL
(NS 972.38)
EP 973.36
FL 973.20
TC 973.70
SW 973.70
SW 973.77
(NS 973.17) (NS 974.60) (NS 974.25)
(NS 973.99)
(NS 973.71) S=2.0% S=1.5%
3:1 MAX
5.00'
(NS 974.54)
PARKWAY
(TOP 969.57)
18"
48" EXISTING 18" DIA. CML STEEL WATER PIPELINE TO REMAIN.
EXACT DEPTH UNKNOWN
EXISTING 48" DIA. RAW WATER
PIPELINE TO REMAIN. EXACTDEPTH UNKNOWN.
34.50'
11.20'
4"
4" 3:1 MAX S=2%
5.00'
INSTALL 8 INCHES OF CLASS 2 BASE MATERIAL FLUSH WITH THE A.C.
PAVEMENT. EXTEND THE CLASS 2 BASE MATERIAL FOR A DISTANCE OF 5 FEET FROM THE EDGE OF PAVEMENT AT A 2% OF SLOPE. COMPACT TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 2" X 8" PRESSURE TREATED HEADER
BOARDS PER DETAIL B ON SHEET 22.
TP 974.09
(NS 974.04)
8"
GRADE THE EXISTING NATIVE MATERIAL FLUSH WITH THE CLASS 2 BASE SURFACE FOR A DISTANCE OF 5 FEET FROM THE EDGE OF
CLASS 2 BASE TO DAYLIGHT. COMPACT THE NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557
EXISTING NATIVE
SURFACE
℄
ROW
NORTH
ROW
SOUTH
ROW
TRACT
LINE
50.00'
38.00' 6.00' 5.00'
0.50' 0.50'
1.67'
3.50'
ROW TO CL
5.00'
50.00'
ROW TO CL
30.00'
TL TO CL
INSTALL 5 INCHES OF
A.C. PAVEMENT. 5"
18"
12"
5"
18"
12"
INSTALL 18 INCHES OF CLASS 2 BASE
MATERIAL. COMPACT THE CLASS 2 BASE
MATERIAL TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
SCARIFY THE TOP 12 INCHES OF SUB-GRADE MATERIAL BENEATH A.C. PAVEMENT AREAS. MOISTURE CONDITION THE NATIVE MATERIAL TO OPTIMUM MOISTURE CONTENTAND COMPACT TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 6-INCH P.C.C. CURB AND
GUTTER PER DETAIL C ON SHEET 22.
INSTALL 6 INCHES OF CLASS 2 BASE. COMPACT
THE CLASS 2 BASE TO 95 PERCENT OF MAXIMUM
DENSITY PER ASTM D-1557.
INSTALL 4 INCHES OF GRANULAR SAND.
COMPACT THE GRANULAR SAND TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NATIVE MATERIAL 1-INCH BELOW THE TOP OF P.C.C. CURB AND GUTTER AND THE TOP P.C.C. SIDEWALK. COMPACT THE NATIVE
MATERIAL TO 90 PERCENT MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 4-INCH P.C.C. SIDEWALK WITH
THICKENED EDGES PER DETAIL D ON SHEET 22.
GRADE THE EXISTING NATIVE MATERIAL 1-INCH BELOW
THE TOP OF P.C.C. SIDEWALK. EXTEND THE NATIVE
MATERIAL GRADING FOR A DISTANCE OF 3.5 FEET FROMBACK OF SIDEWALK TO DAYLIGHT. COMPACT THENATIVE MATERIAL TO 90 PERCENT OF MAXIMUMDENSITY PER ASTM D-1557.
EXISTING
NATIVE
MATERIAL
EXISTING
NATIVE
MATERIAL
EXISTING
NATIVE
MATERIAL
EXISTING NATIVE
SURFACE
EXISTING NATIVE
SURFACE
S=2% S=2.0% S=1.5% 3:1 MAX
(NS 973.01) EP 972.09 FL 971.20
TC 971.70 SW 971.70
SW 971.77
(NS 972.37)
(NS 972.06)
PARKWAY
INSTALL NEW 18-INCH DIA. SDR
26 PVC STORM DRAIN PIPELINE
PER DETAIL I ON SHEET 22.
INV 966.60
4"
4"
8"
(TOP 968.53)
18" 11.20'
48" EXISTING 18" DIA. CML STEEL WATER PIPELINE TO REMAIN.
EXACT DEPTH UNKNOWN
34.50'
(NS 973.81)
3:1 MAX
5.00'
INSTALL 8 INCHES OF CLASS 2 BASE MATERIAL FLUSH WITH THE A.C.
PAVEMENT. EXTEND THE CLASS 2 BASE MATERIAL FOR A DISTANCE OF 5 FEET FROM THE EDGE OF PAVEMENT AT A 2 % SLOPE. COMPACT TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL 2" X 8" PRESSURE TREATED HEADER
BOARDS PER DETAIL B ON SHEET 22.
GRADE THE EXISTING NATIVE MATERIAL FLUSH WITH THE CLASS 2 BASE SURFACE FOR A DISTANCE OF 5 FEET FROM THE EDGE OF CLASS 2 BASE TO DAYLIGHT. COMPACT THE NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
EP 971.36
6.90' ℄
EXISTING 48" DIA. RAW WATERPIPELINE TO REMAIN. EXACTDEPTH UNKNOWN. 10 DANENBERG DRIVE SECTION DETAILS
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 9-10_SECTION DETAILS.dwg 06/10/2022 08:52 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 DANENBERG DRIVE SECTION DETAIL AT STATION 1+00E
SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
DANENBERG DRIVE SECTION DETAIL AT STATION 6+00E
SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
D-D
7 10
E-E
8 10
18.c
Packet Pg. 669
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) WEST
ROW
EAST
ROW
EASEMENT
43.0'
S=2.0%
5.5' 6.0'
8.0'
50.0'
12.0'
SHOULDER
BACKING SLOPE VARIES FROM S=-2.0% TO +2.0%
5.0'
TRACT
LINE
110.0'
55.0'
12.0'
℄
ROW
7"
26"
MATCH EXISTING
GRADE.
EXISTING NATIVE
GRADE.
1 4 2 5 6 7 8 4"
43.0'
40.0'
6.0'
4"
INSTALL 4-INCH P.C.C. SIDEWALK
OVER 4 INCHES OF GRANULAR SAND. INSTALL 6-INCH P.C.C. CURB AND GUTTER OVER 6 INCHES OF CLASS 2 BASE.
INSTALL 7 INCHES OF
A.C. PAVEMENT.
INSTALL 7 INCHES OF
A.C. PAVEMENT.
7"
26"
7"
26"
6"
0.50'
12.0'
INSTALL 26 NCHES
OF CLASS 2 BASE.
INSTALL 26 NCHES
OF CLASS 2 BASE.
INSTALL 6-INCH P.C.C.
CURB AND GUTTER OVER 6
INCHES OF CLASS 2 BASE.
6"
9 10 11
12 13
14 15
16 17 18
19 20
21 22
3 GRADE THE NATIVE MATERIAL FLUSH WITH THE
TOP OF CURB FOR A DISTANCE OF 8 FEET
FROM THE BACK OF CURB TO DAYLIGHT.
INSTALL NATIVE MATERIAL FLUSH WITH
THE TOP OF CURB AND THE TOP OF
SIDEWALK WITHIN PARKWAY AREAS.
TRAVELED WAY TRAVELED WAY
S=1.5%
11 SOUTH IMPERIAL AVENUE PAVEMENT DATA CHART
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 11-13_PAVEMENT DATA CHARTS.dwg 06/10/2022 08:53 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 SOUTH IMPERIAL AVENUE TYPICAL CROSS-SECTION FROM STA 29+00S TO STA 32+00S SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
PAVEMENT DATA CHART
CROWN/ROW
CENTERLINE
18.c
Packet Pg. 670
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
40.00'
EASEMENT 38.00'
6.00'
S=2.0%
5.50' 6.00'
5.00'
55.00'
12.00'
SHOULDER
BACKING
S=2.0%
VARIES FROM 48' TO 4'
5.00'
TRACT
LINE
110.00'
℄
ROW
VARIES
55.00'
17.50'±
TBD BY IID WATER
DEPARTMENT
WEST
ROW
12.00'
EAST
ROW
DAHLIA LATERAL UNDERGROUND 36-INCH
DIAMETER PIPELINE
7"
26"
7"
26"
0.50'
0.50'
INSTALL 6-INCH P.C.C.
CURB AND GUTTER OVER 6
INCHES OF CLASS 2 BASE.
INSTALL NATIVE MATERIAL FLUSH WITH
THE TOP OF CURB AND THE TOP OF
SIDEWALK WITHIN PARKWAY AREAS.
INSTALL 4-INCH P.C.C. SIDEWALK
OVER 4 INCHES OF GRANULAR SAND.
4 5
6 7 4"
4"
6"
10 11
12 13
16 17
18 19
INSTALL 7 INCHES OF
A.C. PAVEMENT.
INSTALL 26 NCHES
OF CLASS 2 BASE.
INSTALL 7 INCHES OF
A.C. PAVEMENT.
INSTALL 26 NCHES
OF CLASS 2 BASE.
INSTALL 6-INCH A.C. DIKE.
MATCH EXISTING
GRADE.
EXISTING NATIVE
GRADE.
1 3
8 14
2 9
15 1.00'
GRADE THE NATIVE MATERIAL FROM THE BOTTOM
OF THE A.C. DIKE FOR A DISTANCE OF 5 FEET FROM
THE BACK OF A.C. DIKE TO DAYLIGHT.
TRAVELED WAY TRAVELED WAY
S=1.5%
12 Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 11-13_PAVEMENT DATA CHARTS.dwg 06/10/2022 08:53 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 SOUTH IMPERIAL AVENUE TYPICAL CROSS-SECTION FROM STA 32+00S TO STA 44+00S SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
SOUTH IMPERIAL AVENUE PAVEMENT DATA CHART
TRACT
LINE
PAVEMENT DATA CHART
18.c
Packet Pg. 671
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
5.00'
VARIES
6.50'
5.00' 12.00'
CLASS 2 BASE
SHOULDER
5"
18"
℄
ROW
30.00'
SOUTH
ROW
20.00'
FUTURE ROAD ROW TO BE DEDICATED FROM
CITY OF EL CENTRO WATER TREATMENT PLANT 38.00'
3.50'
CITY OF EL CENTRO
WATER TREATMENT PLANT
50.00'
80.00'
TRACT
LINE
NORTH
ROW
5"
18"
INSTALL 5 INCHES OF
A.C. PAVEMENT.
INSTALL 18 NCHES
OF CLASS 2 BASE.
INSTALL NATIVE MATERIAL FLUSH WITH
THE TOP OF CURB AND THE TOP OF
SIDEWALK WITHIN PARKWAY AREAS.
INSTALL 6-INCH P.C.C.
CURB AND GUTTER OVER 6
INCHES OF CLASS 2 BASE.
INSTALL 4-INCH P.C.C. SIDEWALK
OVER 4 INCHES OF GRANULAR SAND.
4"
4"GRADE THE NATIVE MATERIAL FLUSH WITH THE TOP OF SIDEWALK FOR A DISTANCE OF 3.5 FEET FROM THE BACK OF SIDEWALK TO DAYLIGHT.
2 4
5 6 7
8 9
14 10 11 12
13 15 16 17
TRAVELED WAY
3 S=1.5%
5.00'
INSTALL 8-INCH OF CLASS 2
BASE SHOULDER.
INSTALL 2" X 8" PRESSURE
TREATED HEADER BOARD
GRADE THE NATIVE MATERIAL FLUSH WITH THE TOP
CLASS 2 BASE SURFACE FOR A DISTANCE OF 5 FEET
FROM THE EDGE OF CLASS 2 BASE TO DAYLIGHT. 1
13 Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 11-13_PAVEMENT DATA CHARTS.dwg 06/10/2022 08:53 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 DANENBERG DRIVE TYPICAL CROSS-SECTION FROM STA 0+91E TO STA 6+82E SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
DANENBERG DRIVE PAVEMENT DATA CHART
CROWN/ROW
CENTERLINE
18.c
Packet Pg. 672
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
55.00'
TRACT
LINE
110.00'
℄
ROW
55.00'
WEST
ROW ℄
PHYSICAL
ROAD EAST
ROW
40.00'
EASEMENT
DAHLIA LATERAL UNDERGROUND 36-INCH
DIAMETER PIPELINE
5.5' 12.0' VARIES
32.0'
0.5'
14.0' 11.0' 14.0' 11.0' 14.0'
32.0'
5.0' 6.0' 44.0'
A.C. PAVEMENT.
6-INCH P.C.C. CURB
AND GUTTER
P.C.C. SIDEWALK A.C. PAVEMENT.
6-INCH P.C.C. CURB
AND GUTTER
5.5'
0.5'
VARIES 5.0'
7"
26"
7"
26"
7"
26"
GRANULAR
SAND
GRANULAR
SAND
CLASS 2 BASE.
CLASS 2 BASE.
CLASS 2 BASE.
CLASS 2 BASE.
S=1.5%
S=1.5%
P.C.C. SIDEWALK
S=2.0%
NORTH
ROW
TRACT
LINE
12.00'
5"
18"
30.00'
SOUTH
ROW
38.00'
℄
ROW
100.00' ROW
38.00'
S=2.0%
12.00'
CITY OF EL CENTRO
WATER TREATMENT PLANT 76.00'
5"
18"
5"
18"
4"
6"
A.C. PAVEMENT.
CLASS 2 BASE.
4"
6"
6.00' 5.00'
3.50'
5.00' 6.00'
3.50'
13.0' 11.0' 11.5' 3.0' 6.0'
6-INCH P.C.C. CURB
AND GUTTER
P.C.C. SIDEWALK
MEDIAN
6.0' 11.5' 11.0'
A.C. PAVEMENT.
3.0'
CLASS 2 BASE. CLASS 2 BASE.
GRANULAR
SAND
CLASS 2 BASE.
GRANULAR
SAND
P.C.C. SIDEWALK
6-INCH P.C.C. CURB
AND GUTTER
S=1.5% S=1.5%
0.50' 0.50'
14 SOUTH IMPERIAL AVENUE & DANENBERG DRIVE
ULTIMATE ROADWAY SECTIONS
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 14_ULTIMATE ROAD SECTIONS.dwg 06/10/2022 08:54 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
SOUTH IMPERIAL AVENUE ULTIMATE ROADWAY SECTION
SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
DANENBERG DRIVE ULTIMATE ROADWAY SECTION
SCALE: 1" = 5' HORIZONTAL
1" = 5' VERTICAL
18.c
Packet Pg. 673
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) AV
8+00S 29+00S 30+00S 31+00S 32+00S 33+00S 34+00S 35+00S 36+00S AV
AV
ROW
ROW ROW RO
SOUTH IMPERIAL AVE.
STA 30+03.00
STA 30+53.00 STA 31+03.00
START STA 32+00.00
STA 31+03.00 STA 32+80.00
STA 33+80.00
3 2
2 2
15 14
13 2 2
2 14 STA 33+80.00
1 1
3 10
22 22
10 START STA 30+18.00
STA 34+30.00
STA 30+03.00
STA 34+80.00
END STA 34+05.00
STA 28+78.13
END STA 30+28.00
10 25
22 17
4 12.00'
11.50'11.50'
15'
11.25'11.25'
13.50' 4
11.25'13.50'
11.25' END STA 31+68.00 25
10 END TAPER STA 32+00.0010
END TAPER
STA 32+00.00
25 END TAPER
STA 32+00.00
25 END STA 32+00.00 25
1 1 1
1 22
10 START
STA 28+39.28
START
STA 28+39.28
STA 28+43.54
END
STA 28+43.54
END
STA 28+43.54
END
STA 28+43.54
START
STA 28+43.54
6 13 STA 29+03.00
15 STA 34+80.00
START STA 32+00.00 10
START STA 32+00.00 25
START TAPERSTA 32+00.00
25 36+00S 37+00S 38+00S 39+00S 40+00S
0+00E
ROW
ROW ROW
SOUTH IMPERIAL AVE.
START TAPERSTA 38+00.00
1 3
START TAPER
STA 40+21.72
16 0+00E
1 17 STA 39+85.45
20 16 STA 40+69.77
STA 39+88.15
16.85'
26 26
29 STA 39+20.27
11.25'
13.09'
START /END TAPERSTA 38+71.00
3 2
START
STA 40+21.72
END STA 40+21.72
10 9
23 5
11 END TAPER
STA 37+21.00
25 29.57'
18 27
END TAPER
START RADIUS
STA 40+21.72
9 25
19.75'
12 12
12 19
START STA 40+74.83 23
DANENBERG
DRIVE27
12 16
START TAPERSTA 37+00.00
9 26
21.25' 26 STA 39+46.36 26
15 STRIPING AND SIGNAGE PLAN FOR
SOUTH IMPERIAL AVENUE
STATION 28+16.32PHASE II
START STRIPING
STATION 36+00 MATCH LINE WITH
BOTTOM LEFT
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
"C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL
CONTROL POINT
THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE
HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONGSTATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD).
PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03FEET + 1000 FEET = 985.97 SEE SHEET 16 FOR
DANENBERG DRIVE
NOT
DO
PASS
R4-1
CURVE DATA CHART
CURVE NUMBER RADIUS (R) DELTA (Δ) CHORD LENGTH (C) LENGTH (L) DESIGN SPEED LIMIT = 35 MPH
CAMUTCD FIGURE 3B-14 (CA)
STATION 36+00 MATCH LINE WITH
TOP RIGHT
W9-1
LANE
RIGHT
DS EN
NOT
DO
PASS
R4-1
SPEED
R2-1
35 LIMIT
SPEED
LIMIT
35 R2-1
W9-1
LANE
RIGHT
DS EN
W4-2
MATCH LINE WITH SHEET 16
STA 40+28.42
1 44.85 87.97 62.29 68.86
2 SIGNAGE CHART
SIGN/PLAQUE SIGN DESIGNATION SIZE BACKGROUND COLOR QUANTITY
RIGHT LANE ENDS
(SYMBOL) SIGN
"RIGHT LANE ENDS" SIGN"DEAD END" SIGNOBJECT MARKER (END OF
ROADWAY) SIGN
W4-2
W9-1
W14-1
OM4-1
36"X36"36"X36"36"X36"
18"X18"
YELLOWYELLOW
224
RED 4
YELLOW
"DO NOT PASS" SIGN R4-1 24"X30" WHITE 2
R1-1 30"X30" RED 2 "STOP" SIGN
W1-6 (R)
W1-6 (L)
48"X24"48"X24"
YELLOW
YELLOW
11 ONE-DIRECTION LARGE
ARROW (R) SIGN
ONE-DIRECTION LARGE
ARROW (L) SIGN
SPEED LIMIT (35 MPH) SIGN R2-1 30"X36" WHITE 2
61.94 52.57 54.86 56.83
W4-2
W16-9
W1-6R
"AHEAD" SIGN W16-9 24"X12" YELLOW 2
STOP AHEAD SYMBOL SIGN W3-1A 30"X30" YELLOW 1
INSTALL TYPE I ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL TYPE VI ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL TYPE IV (L) ARROW PER CALTRANS STANDARD PLAN A24B.INSTALL TYPE IV (R) ARROW PER CALTRANS STANDARD PLAN A24B.INSTALL "STOP" LEGEND AND STOP BAR PER CALTRANS STANDARD PLAN A24D.
INSTALL LIMIT LINE PER CALTRANS STANDARD PLAN A24E.INSTALL YELLOW CENTERLINE PER CALTRANS STANDARD PLAN A20A, DETAIL 22.INSTALL 8-INCH-WIDE DIAGONAL AT 25 FEET ON CENTER IN THE RESTRICTED AREA.
INSTALL WHITE 6-INCH EDGELINE PER CALTRANS STANDARD DETAIL 27B ON PLAN SHEET A20B.
INSTALL WHITE 6-INCH-WIDE LANE LINE PER CALTRANS STANDARD DETAIL 9 ON PLAN SHEET A20A.
INSTALL STOP SIGN (R1-1) PER DETAIL E ON SHEET 22.INSTALL OBJECT MARKER SIGN (OM4-1) DETAIL AA ON SHEET 16.INSTALL RIGHT LANE ENDS SIGN (W9-1) PER CALTRANS STANDARD PLAN RS2.INSTALL RIGHT LANE ENDS (SYMBOL) SIGN (W4-2) PER CALTRANS STANDARD PLAN RS2.INSTALL DO NOT PASS SIGN (R4-1) PER CALTRANS STANDARD PLAN RS2.INSTALL DEAD END SIGN (W14-1) PER CALTRANS STANDARD PLAN RS2. 1 SIGNAGE AND STRIPING KEYNOTES
2 3
4 56789
10 11
1213141516
INSTALL SPEED LIMIT 35 MPH SIGN (R2-1) PER CALTRANS STANDARD PLAN RS2.INSTALL ONE DIRECTION LARGE ARROW (W1-6R) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL ONE DIRECTION LARGE ARROW SIGN (W1-6L) PER CALTRANS STANDARD PLAN RS2.INSTALL AHEAD SIGN (W16-9) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL STOP AHEAD (SYMBOL) SIGN (W3-1A) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL AN 8-INCH WIDE WHITE CHANNELING LINE PER CALTRANS STANDARD PLAN RSP A20D, DETAIL 38.
INSTALL YELLOW 6-INCH WIDE CENTERLINE EXTENSION PER CALTRANS STANDARD PLAN RSP A20D, DETAIL 41.
INSTALL LANE LINE MARKING PER CALTRANS STANDARD PLAN RSP A20A DETAIL 12.
INSTALL DOUBLE YELLOW LINE PER CALTRANS STANDARD PLAN RSP A20A DETAIL 29.
INSTALL WHITE DELINEATORS PER CALTRANS STANDARD PLAN RSP A73C.INSTALL TEMPORARY BARRICADE PER DETAIL AA ON SHEET 16.
REMOVE AND DISPOSE OF EXISTING PAVEMENT ENDS SIGN (W8-3).
INSTALL STOP AHEAD SIGN (W3-1) SIGN PER CALTRAN STANDARD PLAN RS2.INSTALL TYPE V ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL WHITE 6-INCH WIDE RIGHT EDGE LINE EXTENSION THROUGHINTERSECTIONS PER CALTRANS STANDARD PLAN RSP A20B DETAIL 27C. 171819
20 21
22 23
24 25
2627
282930
31 STRIPING QUANTITY CHART
KEYNOTE STRIPING TYPE STRIPING COLOR QUANTITY
TYPE I ARROWTYPE VI ARROWTYPE IV (L) ARROW
8-INCH LANE LINE
WHITEWHITE
EAEAEA
WHITE LFWHITE
6-INCH LANE EXTENSION YELLOW LF
LF
WHITE
WHITE
EAEA
TYPE IV (R) ARROW
"STOP" LEGEND AND STOP
BAR
6-INCH EDGE LINE WHITE LF
CENTERLINE YELLOW LF
DELINIATORS WHITE
YELLOW
1 2
3 4
579
22 23242526
8-INCH CHANNELING LINE WHITE LF
UNIT
76 4
0 80
1770
22 155
670
EA 3
R1-1
W3-1
8-INCH DOUBLE LINES
"STOP AHEAD" SIGN W3-1 30"X30" YELLOW 1 2340
30 TYPE V ARROW WHITE EA 0
W14-1
W14-1
AHEAD
30' 0' 30' 60' 90'
SCALE: 1"=30'
3 37.05 36.76 23.36 23.77
W1-6L
W14-1
OM4-1
OM4-1
OM4-1
OM4-1
6-INCH EDGE LINE
EXTENSTION 31 WHITE EA 105
#
1413161819
20 21
29 1715
12 11
28 W8-3 30"X30" YELLOW 1 REMOVE PAVEMENT END SIGN
6 LIMIT LINE WHITE LF 50
6-INCH LANE LINE WHITE LF 10 1710
27 BARRICADE RED/WHITE EA 3
85.90'
18.c
Packet Pg. 674
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 975
6 S
SD
0+00E 1+00E 2+00E 3+00E 4+00E 5+0
DANENBERG DR.
ROW ROW ROW ROW ROW
ROW
1+50E 2+50E 3+50E
973
1+00E 1+50E 2+00E 2+50E 3+00E 3+50E 4+00E
21 STA 2+66.91 E 16
1 2
END STA 0+66.91 E
5 STA 0+91.50 E
START STA0+66.91 E
STA 1+66.91 E
0+00E
20 END STA 2+20.02 E 7
20' 7
5+0
START STA 0+66.91 E
12 12
5 18
16.85'
END STA 0+66.91 E 31
END STA 2+20.02 E 9
16 12
12 64'
64'
23 9
9 START STA 2+20.02 E 9
END STA
0+66.91 E
9 23
27 STA 0+66.91E 11
S IMPERIAL
AVE.
27 16 19
970.88
SS
SD 00E 6+00E 7+00E
ROW ROW ROW
DANENBERG DR.
28 00E 6+00E
THE SAME NUMBER OF REFLECTORIZED RAILS
USE 3/8" DIAMETER, 4 1/4" LONG LAG BOLTS (GALVANIZED) FOR FASTENING ITEM 2 TOSTANDARD SPECIFICATION AND TO FHWA TYPE IIIA OR VISUAL IMPACT PERFORMANCE (VIP)OBJECT MARKER RED TYPE N2 SIGN REFLECTOR SHALL CONFORM TO STATE OF CALIFORNIAPRESSURE SENSITIVE ADHESIVE, WHITE AND RED TAPE WITH 6" WIDTH (SEE DETAIL ABOVE).REFLECTIVE TAPE CONSISTS OF REFLECTIVE DIAMOND GRADE SHEETING WITH HIGH TACKTHREE (3) CROSS PANELS TO BE 2" x 8" x VARIES, TIMBER S.4S.
SHALL BE ON EACH SIDE.WHEN RAILS ARE FACING IN TWO DIRECTIONS, NOTES:
6754132
ALL TIMBER TO BE S.4S. WEATHER RESISTANT.RAILS FACING TRAFFIC TO BE REFLECTORIZED.ITEM 1 (MINIMUM 4 BOLTS PER CONNECTION).POST IS TO BE 6" x 6" x VARIES, TIMBER S.4S. --
REFLECTIVE SHEETING. INSTALL TYPE N2 REFLECTOR ON ALL POSTS EXCEPT FOR THE END POSTS. ----
3 5'
7'
45° 45°
RED
CL
6"
6"
3' MIN.
28'
NOTE:
60'46'54'40'
7544
20' ALLEY
ROADWAY
WIDTH OF
32 PANELS
NUMBER OF 6
2 4
8'
3 1
8'
26'
4433
58'44'52'38'
OF RAILS
TOTAL LENGTH
N2
12 NO. OF
18'
1 1'
20" 20"
12"
4 4
3 1
BARRICADE DETAIL AA
NTS 15,16 16
TYP. TYP.
64' OR PER PLAN
SS
ROW
ROW
ROW
ROW ROW ROW ROW
64'
64'
27 16
0' 20' 40' 60'
SCALE: 1"=20'
20'
DANENBERG DRIVE STRIPING AND SIGNAGE
PLAN FROM STATION 0+00 E TO STATION 8+00 E
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 16_STRIPING PLAN.dwg 06/10/2022 11:12 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 OM4-1
STATION 5+00E MATCH LINE
WITH BOTTOM LEFT
STATION 6+82.19E END OF PHASE II
STRIPING
STATION 5+00E MATCH LINE WITH
TOP RIGHT
MATCH LINE WITH SHEET 15 STA 40+28.42
DESIGN SPEED LIMIT = 35 MPH
CAMUTCD FIGURE 3B-14 (CA)
W1-6L
W1-6R
W16-9
AHEAD
W3-1A
REFER TO SIGNAGE CHART AND
STRIPING QUANTITY CHART ON
SHEET 15
INSTALL TYPE I ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL TYPE VI ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL TYPE IV (L) ARROW PER CALTRANS STANDARD PLAN A24B.INSTALL TYPE IV (R) ARROW PER CALTRANS STANDARD PLAN A24B.INSTALL "STOP" LEGEND AND STOP BAR PER CALTRANS STANDARD PLAN A24D.
INSTALL LIMIT LINE PER CALTRANS STANDARD PLAN A24E.INSTALL YELLOW CENTERLINE PER CALTRANS STANDARD PLAN A20A, DETAIL 22.INSTALL 8-INCH-WIDE DIAGONAL AT 25 FEET ON CENTER IN THE RESTRICTED AREA.
INSTALL WHITE 6-INCH EDGELINE PER CALTRANS STANDARD DETAIL 27B ON PLAN SHEET A20B.
INSTALL WHITE 6-INCH-WIDE LANE LINE PER CALTRANS STANDARD DETAIL 9 ON PLAN SHEET A20A.
INSTALL STOP SIGN (R1-1) PER DETAIL E ON SHEET 22.INSTALL OBJECT MARKER SIGN (OM4-1) DETAIL AA ON SHEET 16.INSTALL RIGHT LANE ENDS SIGN (W9-1) PER CALTRANS STANDARD PLAN RS2.INSTALL RIGHT LANE ENDS (SYMBOL) SIGN (W4-2) PER CALTRANS STANDARD PLAN RS2.INSTALL DO NOT PASS SIGN (R4-1) PER CALTRANS STANDARD PLAN RS2.INSTALL DEAD END SIGN (W14-1) PER CALTRANS STANDARD PLAN RS2. 1 SIGNAGE AND STRIPING KEYNOTES
2 3
4 5
6 789
10 11
1213141516
INSTALL SPEED LIMIT 35 MPH SIGN (R2-1) PER CALTRANS STANDARD PLAN RS2.INSTALL ONE DIRECTION LARGE ARROW (W1-6R) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL ONE DIRECTION LARGE ARROW SIGN (W1-6L) PER CALTRANS STANDARD PLAN RS2.INSTALL AHEAD SIGN (W16-9) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL STOP AHEAD (SYMBOL) SIGN (W3-1A) SIGN PER CALTRANS STANDARD PLAN RS2.INSTALL AN 8-INCH WIDE WHITE CHANNELING LINE PER CALTRANS STANDARD PLAN RSP A20D, DETAIL 38.
INSTALL YELLOW 6-INCH WIDE CENTERLINE EXTENSION PER CALTRANS STANDARD PLAN RSP A20D, DETAIL 41.
INSTALL LANE LINE MARKING PER CALTRANS STANDARD PLAN RSP A20A DETAIL 12.
INSTALL DOUBLE YELLOW LINE PER CALTRANS STANDARD PLAN RSP A20A DETAIL 29.
INSTALL WHITE DELINEATORS PER CALTRANS STANDARD PLAN RSP A73C.INSTALL TEMPORARY BARRICADE PER DETAIL AA ON SHEET 16.
REMOVE AND DISPOSE OF EXISTING PAVEMENT ENDS SIGN (W8-3).
INSTALL STOP AHEAD SIGN (W3-1) SIGN PER CALTRAN STANDARD PLAN RS2.INSTALL TYPE V ARROW PER CALTRANS STANDARD PLAN RSP A24A.INSTALL WHITE 6-INCH WIDE RIGHT EDGE LINE EXTENSION THROUGHINTERSECTIONS PER CALTRANS STANDARD PLAN RSP A20B DETAIL 27C. 17 18
19 20
21 222324252627282930
31 R1-1
W14-1
W14-1
W14-1
OM4-1
OM4-1 OM4-1
CURVE DATA CHART
CURVE NUMBER RADIUS (R) DELTA (Δ) CHORD LENGTH (C) LENGTH (L) 1 44.85 87.97 62.29 68.86
2 53.25 90.83 75.85 82.83
18.c
Packet Pg. 675
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 2+00 3+00 4+00 5+00 6+00 7+00
50' ROW
STA 1+15E STA 3+75E STA 6+72E
FR FR FR FR FR FR FR FR FR
FR FR FR FR FR FR FR FR
5 5 5 5
5 5
5 5
5 5 5 5 5
5 5
5 2
7 4
2 7
9 9
2 2
3 7
7 2
SS
PI: 41+21.59
0+00 1+00 BP: 0+00.00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 STA 37+96S FR FR FR FR FR FR FR FR FR FR FR FR
FR FR FR FR FR
FR FR
FR FR FR FR
FR FR5
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5
9 9 2
2 1
DA-01
SSCA-01
SS SS
AV
PI: 28+00.00
40' EASEMENT 110' ROW28+00 29+00 30+00 31+00 32+00 33+00 34+00 STA 33+36S STA 29+40S STA 29+40S
FR FR FR FR FR FR FR FR FR FR FR
FR FR FR
FR
FR FR
FR FR
5 5 5 5 5 5 5 5 5
5 5
5 5 5 5 5
5 7
4 2
2 6
2 2
9 9 2
3 7 7
1 DA-01
SSCA-01
17 EROSION CONTROL PLAN
LEGEND
PORTABLE TOILET
GRAVEL BAGS
CONCRETE WASHOUT AREACONSTRUCTION ENTRANCE
FIBER ROLLSRAIN GAUGE
SAMPLE POINT
CONTRACTOR SHALL LOCATE THE PORTABLE
RESTROOM FACILITIES TO A LOCATION
APPROVED BY THE ENGINEER. SEE DETAIL D FOR
TYPICAL STAGING AREA ON SHEET 18.
INSTALL TWO (2) LAYER GRAVEL-FILLED BAGS AT
AND ALONG THE DOWNSTREAM LOCATIONS OF
THE EXISTING/NEW CONCRETE STORMWATER
CONVEYANCE FACILITIES AND ALONG THE LIMITSOF CONSTRUCTION. SEE DETAIL F ON SHEET 18.
INSTALL CONCRETE WASHOUT AREA PER
CALIFORNIA BMP HANDBOOK WM-8 DETAILS. SEE
DETAIL A ON SHEET 18.
INSTALL CONSTRUCTION ENTRANCE PER DETAIL E
ON SHEET 18.
INSTALL FIBER ROLLS PER DETAIL C ON SHEET 18.INSTALL A RAIN GAUGE PER THE CALTRANS
CONSTRUCTION SITE MONITORING PROGRAM
GUIDANCE MANUAL.
SAMPLING POINT
LIMITS OF CONSTRUCTION
WORK AREA
2 3
45 FR
1 BMP KEYNOTES
SCALE: 1"=40'
SCALE: 1"=40'
MATCHLINE SEE ABOVE
RIGHT AT STA 1+11E
MATCHLINE SEE ABOVE
RIGHT AT STA 34+56S
MATCHLINE SEE BELOW
LEFT AT STA 1+11E
BMP
NO. ITEM UNIT QUANTITY NOTES/ COMMENT
- CONSTRUCTION SITE AND SWPPP MANAGEMENT LS
SITE MANAGEMENT, INSPECTION AND MONITORING BY A QSP PROVIDED BY THE CONTRACTOR INCLUDING, BUT IS NOT LIMITED TO , NS-1 THROUGH NS-15 AND WM-1 THROUGH WM-10, REFER TO LATEST CALTRANS STANDARD PLANS AND SPECIFICATIONS AND CALTRANS CONSTRUCTION SITEBMPS MANUAL.
SE-7 STREET SWEEPING LS STREET SWEEPING SHALL BE PERFORMED DAILY AS NECESSARY TO ENSURE TRAVELED WAYS ARE FREE OF DIRT.
SE-5 TEMPORARY FIBER ROLLS LF 4,000 PERIMETER CONTROL, PLACED ALONG THE CONSTRUCTION LIMITS AS SHOWN ON THIS PLAN FOR EROSION CONTROL.
WE-1 WIND EROSION CONTROL LS MAINTAIN DUST CONTROL THROUGHOUT THE ENTIRE SITE FOR THE DURATION OF THE PROJECT. WATER TRUCKS, OR EQUIVALENT BMP, SHALL BE USED FOR DUST SUPPRESSION.
TC-1 & TC-3 TEMPORARY CONSTRUCTION ENTRANCE/ EXIT WITH TIRE WASH EACH 2 THE CONSTRUCTION ENTRANCES SHALL BE INSTALLED AND MAINTAINED UNTIL FINAL PAVEMENT CONSTRUCTION IS COMPLETE. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING CONTROL THROUGH REGULAR STREET SWEEPING, GRIZZLY PADS, OR OTHER TRACKING CONTROL MEANS. - TEMPORARY RESTROOM FACILITIES EACH 2 THE RESTROOM FACILITIES SHALL BE SECURED FROM OVERTURNING IN HIGH WIND CONDITIONS- RAIN GAUGE EACH 1 INSTALL A RAIN GAUGE PER THE CALTRANS CONSTRUCTION SITE MONITORING PROGRAM GUIDANCE MANUAL.- GRAVEL BAG LOCATION 3 INSTALL TWO (2) LAYER GRAVEL-FILLED BAGS AT AND ALONG THE DOWNSTREAM LOCATIONS OF
THE EXISTING/NEW CONCRETE STORMWATER CONVEYANCE FACILITIES AND AT THE LIMITS OF ROADWAY. SEE DETAIL F ON SHEET 18.
SP1
1. EROSION CONTROL PLAN INCLUDES ALL POSSIBLE BMPS FOR THE CONSTRUCTION OF THIS PROJECT.
CONTRACTOR SHALL APPLY APPROPRIATE BMPS FOR EACH PHASE OF CONSTRUCTION.
2. DURING MASS GRADING ACTIVITIES, STREETS WILL BE SWEPT AS NECESSARY TO PREVENT DIRT AND DUST FROM LEAVING THE CONSTRUCTION AREA.
3. CONTRACTOR SHALL PROVIDE ADEQUATE DUST SUPPRESSION TO MEET ALL LOCAL AIR POLLUTION CONTROL DISTRICT REQUIREMENTS INCLUDING ALL DETOUR SIDE ROADS.
4. ALL BEST MANAGEMENT PRACTICES SHALL MEET THE REQUIREMENTS OF THE LATEST VERSION OF CASQA STORMWATER BEST MANAGEMENT PRACTICE HANDBOOK.
5. SITE DISTURBING ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES.
6. NO SITE CLEARING OR GRADING SHALL BEGIN UNTIL ALL PERIMETER EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN INSTALLED.
7. GENERAL CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCE THAT APPLY.
8. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION.
9. DRAIN INLET PROTECTION SHALL BE PROVIDED THROUGHOUT THE DURATION OF THE PROJECT.
EXISTING DRAIN INLETS SHALL BE PROTECTED UNTIL FINAL REMOVAL AND THE CONNECTING PIPE SHALL BE PROPERLY CAPPED TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM.
10. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS NECESSARY TO
ESTABLISH PERMANENT SOIL STABILIZATION ON ANY EXPOSED AREAS WHEN THE PROJECT IS COMPLETE.
CITY OF EL CENTRO EROSION AND SEDIMENT CONTROL PLAN STANDARD NOTES GENERAL EROSION CONTROL NOTES:
1. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THERE IS A FIFTY PERCENT (50%) CHANCE OF RAIN WITHIN A FORTY-EIGHT (48) HOUR PERIOD. SILT AND DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
2. ONE HUNDRED TWENTY FIVE PERCENT (125%) OF ALL SUPPLIES NEEDED FOR BMP MEASURES SHALL BE
RETAINED ON THE JOB SITE IN A MANNER THAT ALLOWS FULL DEPLOYMENT AND COMPLETE INSTALLATION IN FORTY EIGHT (48) HOURS OR LESS OF A FORECASTED RAIN.
3. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT.
4. CONTRACTOR TO CONDUCT STREET SWEEPING EACH DAY AT CLOSE OF BUSINESS TO REMOVE CONSTRUCTION DEBRIS. INCREASE FREQUENCY IF DEBRIS ARE NOTICEABLE WITHIN THE TRAVELED WAY.
5. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MAINTAINED. MAINTENANCE SHALL INCLUDE
REMOVAL OF SILT FROM BARRIERS AND SEDIMENTATION DEVICES, SEEDING OR MULCHING OF DAMAGED STABILIZED AREAS AND REPLACEMENT OR REPAIR OF WORN OR DAMAGED GEOTEXTILE FABRIC.
6. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE RESIDENT ENGINEER OR OWNER AFTER EACH RUN-OFF PRODUCING RAINFALL.
7. ALL BARE SLOPES AND DISTURBED AREAS SHALL BE PLANTED AS EACH STAGE OF GRADING IS COMPLETE.
SUITABLE MEASURES TO PREVENT SLOPE EROSION, INCLUDING, BUT NOT LIMITED TO, RAPID GROWING
VEGETATION SUITABLE TO STABILIZE THE SOILS SHOULD BE INSTALLED ON ALL AREAS, AND/OR SUCHAREAS SHOULD BE MULCHED, WHILE THE PERMANENT VEGETATION COVER MATURES ENOUGH TO PROVIDE STABILITY.
8. ANY DISTURBED AREA THAT WILL NOT HAVE ANY SOIL DISTURBING ACTIVITIES FOR 14 DAYS OR MORE MUST BE FULLY PROTECTED FROM EROSION UNTIL ADEQUATE LONG-TERM PROTECTIONS ARE INSTALLED. ALLEROSION CONTROL MEASURES SHALL REMAIN INSTALLED AND MAINTAINED DURING ANY INACTIVE PERIOD.
9. ANY SLOPES WITH DISTURBED SOILS OR DENUDED VEGETATION MUST BE STABILIZED SO AS TO INHIBIT EROSION BY WIND AND WATER.
10. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
11. CONSTRUCTION MATERIALS SHALL BE STORED IN STAGING AREAS ON-SITE UNTIL NEEDED FOR INSTALLATION. WASTE WILL EITHER BE PLACED IN DUMPSTERS OR IN WASTE MANAGEMENT AREAS. ALL
WASTE WILL BE TRANSPORTED OFF-SITE IN A TIMELY MANNER TO APPROVED WASTE DISPOSAL AREAS (DUMPS). STORAGE, HANDLING AND TRANSPORTATION OF WASTE SHALL BE IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL LAWS.
12. CONSTRUCTION MATERIALS DELIVERED TO THE SITE SHALL BE STORED THROUGHOUT THE SITE. THE CONTRACTOR SHALL STORE THE MATERIALS AS TO MINIMIZE THE RISK OF STORM WATER POLLUTION,GROUND WATER POLLUTION, SOIL CONTAMINATION AND INJURY TO WORKERS AND VISITORS.
13. EQUIPMENT TO BE STORED, FUELED AND MAINTAINED ON SITE SHALL BE KEPT AWAY FROM ANY DRAINAGE COURSES. CONTRACTORS SHALL USE A DRAINAGE PAN OR DROP CLOTH TO CATCH ANY LEAKS OR SPILLS AT A MINIMUM.
6 7
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 17-18_EROSION CONTROL PLAN.dwg 06/10/2022 08:59 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
MATCHLINE SEE BELOW
LEFT AT STA 34+56S
SOUTH IMPERIAL AVENUE
START OF PROJECT
SCALE: 1"=40'
8 LIMITS OF CONSTRUCTION
9 WORK AREA
SP2
SP1
SP3
SP4
DANENBERG DRIVE END OF PROJECT SP5 SP6 SP7
18.c
Packet Pg. 676
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) PLAN
NOT TO SCALE
TYPE "BELOW GRADE"
VARIES
MIN
SANDBAG
LATH AND FLAGGING
ON ALL SIDES
A
NOT TO SCALE
SECTION A-A
SANDBAG
10 MIL
PLASTICLINING
BERM
3'-0"
10 MIL PLASTIC
LINING
A
10'-0"
NOTE:
CONTRACTOR SHALL USE A TEMPORARY WASHOUT AREA AT AREAS WHERE A PERMANENT CONCRETE WASHOUT IS NOT ALLOWED.
BERM
SS SS
WM-9
LEGEND
SE-1 SILT FENCESE-5 FIBER ROLLS
NS-8 VEHICLE AND EQUIPMENT CLEANINGNS-9 VEHICLE AND EQUIPMENT FUELINGNS-10 VEHICLE AND EQUIPMENT MAINTENANCE WM-1 MATERIAL DELIVERY AND STORAGEWM-3 STOCKPILE MANAGEMENTWM-4 SPILL PREVENTION AND CONTROLWM-5 SOLID WASTE MANAGEMENTWM-6 HAZARDOUS WASTE MANAGEMENTWM-9 SANITARY/SEPTIC WASTE MANAGEMENT TC-1 STABILIZED CONSTRUCTION ENTRANCE/EXITTC-3 TEMPORARY ENTRANCE/OUTLET TIRE WASH WE-1 WIND EROSION CONTROL (TO BE IMPLEMENTED FOR UNPAVED/NATIVE AREAS
STOCKPILE MANAGEMENT)
WM-9 NS-8
NS-9NS-10
WM-5
WM-1WM-3WM-4WM-6
TC-1TC-3
PERIMETER SEDIMENT
CONTROL (PSC) (SE-1, SE-5,
ETC.) AROUND PERIMETER OF
STAGING AREA IF AREA IS NOT
PAVED.
PSC PSC PSCPSC PSC PSC
PSC PSC PSC
PSC PSC
NOTES:
1. CONTRACTOR SHALL ADJUST THE LAYOUT OF STAGING AREA BASED ON PROJECT SITE CONDITIONS AS NECESSARY.
2. CONTRACTOR SHALL IMPLEMENT PERIMETER SEDIMENT CONTROL FOR
STAGING AREA BASED ON PROJECT SITE CONDITIONS UPON THE
APPROVAL OF THE RESIDENT ENGINEER.
TYPICAL STAGING AREA LAYOUT
SS SS
NS-8NS-9NS-10
WM-5
WM-1WM-3WM-4WM-6
TC-3
MARK BOUNDARY OF
AREA WITH ORANGE
CONES
PARKING AREA FOR
VEHICLES/EQUIPMENT
PERIMETER SEDIMENT
CONTROL (PSC) (SE-1, SE-5,
ETC.) AROUND PERIMETER OF
STAGING AREA IF AREA IS NOT
PAVED.
PSC PSC PSCPSC PSC PSC
PSC PSC PSC
PSC PSC
18 EROSION CONTROL DETAILS
CONCRETE WASHOUT AREA - DETAIL A
NOT TO SCALE
PAVED ROADWAY MATCH EXISTING GRADE
NOTE:MANY DESIGNS CAN BE FIELDFABRICATED, OR FABRICATEDUNITS MAY BE USED AS LONG ASDESIGN IS ADEQUATE FOR FULL
LENGTH CONSTRUCTION TRUCK
VEHICLES.
WASH RACK
A
A
B
B
DITCH TO CARRYRUNOFF TO A SEDIMENT
TRAPPING DEVICE
SECTION B-B
NTS
300 mm (12 IN) MIN, UNLESS OTHERWISESPECIFIED BY A SOILS ENGINEER CRUSHED AGGREGATE GREATER THAN 75
mm (3 IN) BUT SMALLER THAN 150 mm (6 IN)
FILTER FABRIC ORIGINAL GRADE
SECTION A-A
NTS
300 mm (12 IN) MIN, UNLESS OTHERWISESPECIFIED BY A SOILS ENGINEER
FILTER FABRIC ORIGINAL
GRADE
CRUSHED AGGREGATE GREATER THAN 75
mm (3 IN) BUT SMALLER THAN 150 mm (6 IN)
CORRUGATED STEEL PANELS
WATER SUPPLY
& HOSE
CONSTRUCTION ENTRANCE - DETAIL E
NOT TO SCALE
TYPICAL FIBER ROLL INSTALLATION - DETAIL C
NTS
TYPICAL STAGING AREA - DETAIL D
NOT TO SCALE
SLOPE
TOE OF SLOPE
6"
6"
18" 30"
6"
2" X 2" WOOD STAKE.
STAKE DIMENSIONS
ARE NOMINAL. STAKES
SHALL BE SPACED AT8'-0" MAXIMUM ANDSHALL BE POSITIONED
ON DOWNSTREAM SIDEOF FENCE.
SEE DETAIL A
FABRIC
DIMENSION MAY VARY
TO FIT FIELD CONDITION
2" X 2" WOOD SILT FENCE STAKE FABRIC
DETAIL A
6"
6"
SILT FENCE DETAIL - DETAIL B
NOT TO SCALE
TEMPORARY DRAINAGE
INLET PROTECTION (TYPE 3A)
(GRAVEL BAG BERM)
PERSPECTIVE
ROADWAY
CL
FLOW
PLAN
4'-0" MIN FROM EDGE
OF TRAVELED WAY
SLOPE OF ROADWAY (PERCENT) 1 to 3.9 4 to 5.9 6 to 7.9 8 to 10 For slope of less than 1%, install barriers only if erosion/sediment is prevalent INTERVAL BETWEEN BERM 100' 75' 50' 25'
GRAVEL BAG BERM (TYPE 3A) SPACING TABLE
12'
10+
GRAVEL BAG DETAIL - DETAIL F
NOT TO SCALE
PLACE ADDITIONAL BAGS ON TOP OF
CURB AND UPSTREAM OF GRAVEL BAG
BERM TO PREVENT OVER TOPPING.
INSTALL GRAVEL-FILLED BAGS FLUSH
AGAINST CURB OR DIKE FACE.
CONSTRUCT GRAVEL BAG BERM BY
TIGHTLY ABUTTING GRAVEL-FILLED
BAGS TO ELIMINATE GAPS AND
VOIDS.
FLOW
EXTEND AS NECESSARY TO FORCE
PONDED RUNOFF OVER SPILLWAY
INSTEAD OF OUT FLANKING AROUND
END OF BERM.
END OF GRAVEL
BAG BERM
STACK GRAVEL-FILLED BAGS
1-LAYER-HIGH FOR SPILLWAY AND
2-LAYERS-HIGH FOR REMAINING BERM
SPILLWAY
SPILLWAY
GRAVEL BAG BERM
DRAINAGE INLET
CURB OR DIKE
SIDEWALK OR
SHOULDER BACKING
INTERVAL (SEE TABLE)
4'-0"
TYP
4'-0" MIN
6'-0" MIN
4' MAX
4' MAX
4' MAX
4' MAX
VERTICAL SPACING MEASURED ALONG THE FACE OF THE SLOPE VARIES BETWEEN 10' AND 20' INSTALL A FIBER ROLL NEAR SLOPE WHERE IT TRANSITIONS INTO A STEEPER SLOPE.
INSTALL MULTIPLE FIBER
ROLLS AS APPLICABLE PERPLANS.
INSTALL MULTIPLE
FIBER ROLLS AS
APPLICABLE PER
PLANS.
1-FOOT
DIAMETER
FIBER ROLL
SLOPE VARIES
3/4" X 3/4" X 24" WOODSTAKES WITH MAXIMUMSPACING OF 4-FOOT ON CENTER .
2" MIN
4" MAX
BURY
DEPTH
12" MIN
SP4
SP5
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 17-18_EROSION CONTROL PLAN.dwg 06/10/2022 09:00 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
18.c
Packet Pg. 677
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
WAKE AVENUE
CYPRESS DRIVE
2 CLOSED
ROAD
AHEAD
W20-3
ROAD
WORK
AHEAD
W20-1
3 100'
NTS
1 100'
NTS
SOUTH IMPERIAL AVENUE
DANENBERG DRIVE
1 2
DIRT ROAD
3 2
WAKE AVENUE
1 1
19 TRAFFIC CONTROL PLAN
TRAFFIC CONTROL LEGEND
ITEM
NO.
ITEM
DESCRIPTION ITEM
1. 2.
3. 4.
5.6. CHANNELIZING DEVICE
DIRECTION OF TRAFFIC
TYPE III BARRICADE
WARNING/REGULATORY SIGNWARNING LIGHTWORK AREA
GENERAL TRAFFIC CONTROL NOTES:
1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE LATEST
VERSION OF CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) AND CA MUTCD SUPPLEMENT UNLESS SPECIFIED OTHERWISE.
2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL
MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY
THE CITY OF EL CENTRO PUBLIC WORKS DEPARTMENT REPRESENTATIVE, IMPERIAL COUNTY REPRESENTATIVE, OR THE RESIDENT ENGINEER. THESE CHANGES MAY BE ACCOMPLISHED IN THE FIELD.
3. TRAFFIC CONTROL DEVICES SHOWN ON PLANS ARE LOCATED APPROXIMATELY AND SHALL BE ADJUSTED AS REQUIRED TO MEET FIELD CONDITIONS. ALL SUCH CHANGES MADE DUE TO FIELD
CONDITIONS SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF CA MUTCD, CA MUTCD SUPPLEMENT, IMPERIAL COUNTY STANDARDS AND CITY OF EL CENTRO STANDARDS ANDSPECIFICATIONS.
4. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROLPLANS.
5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES.6. ALL SIGNS SHALL BE HIGH INTENSITY REFLECTIVE. ALL TRAFFIC CONTROL DEVICES SHALL BE REFLECTIVE WITH FLASHING LIGHTS.
7. THE INTENSITY AND DISTRIBUTION OF LIGHT FROM EACH ILLUMINATED SIGNAL LENS SHOULD CONFORM TO THE CURRENT “STANDARDS FOR VEHICLE TRAFFIC CONTROL SIGNAL HEADS” AND “TRAFFIC SIGNAL LAMPS” (SEE SECTION 1A.11 OF LATEST VERSION OF CA MUTCD). IF A SIGNAL
INDICATION IS OPERATED IN THE FLASHING MODE FOR NIGHTTIME OPERATION AND THE SIGNALINDICATION IS SO BRIGHT AS TO CAUSE EXCESSIVE GLARE, SOME FORM OF AUTOMATIC DIMMING SHOULD BE USED TO REDUCE THE BRILLIANCE OF THE SIGNAL INDICATION.
8. REFER TO THE LATEST REVISION OF CA MUTCD REGARDING THE NOTES FOR EACH TYPICAL APPLICATION CALLED OUT ON THIS PLAN.
9. CONTRACTOR SHALL INSPECT TRAFFIC CONTROL AT THE BEGINNING AND AT THE END OF EACH WORKING DAY TO ENSURE COMPLIANCE WITH THESE PLANS.
10. CONTRACTOR SHALL INSTALL ADA COMPLIANT TEMPORARY RAMPS BETWEEN THE EDGE OF THE EXISTING CURB RETURN/ HANDICAP RAMP AND EXCAVATED SURFACE AT THE END OF EACH WORKDAY.
11. CONTRACTOR SHALL INSTALL CLASS 2 BASE UP TO FINISHED GRADE ELEVATION AFTER SAWCUT AND REMOVAL OF EXISTING A.C. BARRIER CURB / A.C PAVEMENT SECTION / P.C.C. SIDEWALK.
PRIOR TO OPENING THE LANE TO TRAFFIC.CONTRACTOR SHALL PLACE CLASS 2 BASE FROM THEEXISTING EDGE OF PAVEMENT TO THE EDGE OF THE SAWCUT AREA AT A SLOPE NO STEEPER THAN 6:1.
12. NO STREET PARKING SHALL BE ALLOWED ALONG DANENBERG DRIVE WITHIN THE CONSTRUCTION ZONES DURING THE PROJECT CONSTRUCTION PERIOD. CONTRACTOR SHALL INSTALL NO PARKING SIGNS (R8-3A) AT ALL REQUIRED AREAS AT LEAST ONE WEEK PRIOR TO BEGINNING OF CONSTRUCTION.
13. CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL DEVICES ACCORDING TO TYPICAL APPLICATION CA MUTCD 2014, FIGURE 6H-29 (TA-29): CROSSWALK CLOSURES AND PEDESTRIAN
DETOURS IF REQUIRED TO PROVIDE TEMPORARY PEDESTRIAN ACCESS AT ALL INTERSECTIONS AFFECTED BY THE PROPOSED CONSTRUCTION ACTIVITIES. IF NECESSARY CONTRACTOR SHALL PROVIDE FLAG PERSONNEL FOR ADDITIONAL TRAFFIC CONTROL AS NEEDED.
14. IF A PORTION OF THE CONSTRUCTION AREA IS OPEN AT THE END OF THE WORK DAY, EACH EXPOSED SECTION MUST BE COMPLETELY FILLED WITH CLASS 2 BASE MATERIAL AND SURROUNDED WITH BARRICADES AND TAPE OR AS APPROVED BY THE CITY ENGINEER.
15. ALL ADJACENT BUSINESSES, RESIDENCES, SCHOOLS AND CHURCHES SHALL BE DULY NOTIFIED BY THE CONTRACTOR, IN WRITING, OF HIS PROPOSED OPERATIONS. NOTICE SHALL BE DELIVERED AT LEAST TWO (2) WORKING WEEKS PRIOR TO START OF CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPRODUCTION OF NOTIFICATION LETTERS. THE NOTIFICATION LETTERS SHALL BE WRITTEN IN ENGLISH AND SPANISH LANGUAGES.RE-NOTIFICATION WILL BE REQUIRED IF THE CONTRACTOR'S SCHEDULE IS ALTERED OR OTHERDELAYS OCCUR WHICH AFFECT THE PROJECT SCHEDULE.
16. IF CONSTRUCTION OCCURS DURING THE SCHOOL YEAR, CONTRACTOR SHALL NOTIFY IN WRITING
TO THE EL CENTRO ELEMENTARY SCHOOL DISTRICT AND EL CENTRO UNION HIGH SCHOOL DISTRICT OF THE PROPOSED ROAD CLOSURES AT LEAST TWO (2) WEEKS PRIOR TO START OF CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL COORDINATE WITH THE SCHOOL DISTRICTS ANY ADDITIONAL TRAFFIC CONTROL THAT MAY REQUIRED FOR SCHOOL BOUND PEDESTRIAN ANDVEHICULAR TRAFFIC.
17. THE CONTRACTOR SHALL MAKE ACCOMMODATIONS TO ALLOW REGULARLY SCHEDULED SOLID
WASTE DISPOSAL PICK UP ALONG THE AFFECTED STREET SECTIONS DURING THE PROJECT CONSTRUCTION PERIOD.
18. CONTRACTOR SHALL COVER EXISTING TRAFFIC SIGNS, TRAFFIC SIGNALS, OR PEDESTRIAN SIGNAL
INDICATIONS SHOULD SAID CONTROLS CONFLICT WITH TEMPORARY TRAFFIC CONTROL PLAN OR AS DIRECTED BY THE CITY OF EL CENTRO.
19. WHENEVER THE WORK CAUSES OBLITERATION OF PAVEMENT DELINEATION, TEMPORARY OR
PERMANENT PAVEMENT DELINEATION SHALL BE IN PLACE PRIOR TO OPENING THE TRAVELED WAY TO PUBLIC TRAFFIC. LANE LINES AND CENTERLINE PAVEMENT DELINEATION SHALL BE PROVIDED AT ALL TIMES FOR TRAVELED WAYS OPEN TO THE PUBLIC TRAFFIC.
20. CONTRACTOR SHALL REPLACE/REPAIR ANY AND ALL STRIPING, PAVEMENT MARKINGS, RAISED
PAVEMENT MARKERS, AND CURB PAINT DISRUPTED OR REMOVED DURING THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
21. ALL ADVANCED WARNING SIGNS SHALL BE EQUIPPED WITH FLAGS FLASHING YELLOW BEACONS, TYPE-B SHALL BE USED ON ALL W20-1, W20-2, C-19 SIGNS AND ON ALL TYPE-III AND TYPE-II BARRICADES GUARDING THE WORK AREA OVERNIGHT.
** LATEST VERSION OF CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) IS CA MUTCD 2014 **
*** A COPY OF CA MUTCD 2014 CAN BE OBTAINED FROM
"HTTP://WWW.DOT.CA.GOV/HQ/TRAFFOPS/ENGINEERING/MUTCD/CA_MUTCD2014.HTM" *** INSTALL TYPE III BARRICADE WITH WARNING LIGHTS ASILLUSTRATED ON PLANS.INSTALL WARNING/REGULATORY SIGN AS ILLUSTRATED ON THE PLAN.
INSTALL WARNING/REGULATORY SIGN WITH WARNING
LIGHT AS ILLUSTRATED ON THE PLAN.
123
TRAFFIC CONTROL KEYNOTES:
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 19_TRAFFIC CONTROL PLAN.dwg 06/10/2022 11:22 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 0' 100' 200' 300' SCALE: 1"=100' 100'
18.c
Packet Pg. 678
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 970 966 967966 967 968 968 969 969 971 971 971
965 965 965 965 965965
970 970 970 970 970 966 966 966 966 967 967 967 967 967 967 967 967
968 968 968 968 968
969
969 969 969 969
971
965
970 970
966967 968 968 968
969 969
970 970 970 970 970
970
975 975 975
975 971
971
971 971
971 971 971 971 971
972972
972
972
972 972 972 972 972 972
972 972 972 972 972 972 972 973 973 973 973 973 973 973 973 973 973 973 973973 973 973 973 973
974 974
974 974 974 974 974 974 974 974 974
974
974
976 977
9 E E
SIGNAL
SS
AV
29+00S 30+00S 31+00S 32+00S 33+00S 34+00S 35+00S 36+00S 37+00S 38+00S 39+00S 40+00S 41+00S AV
SI
GNA
L
0+00E
E 1+00E
(18" W) (18" W) (18" W) (18" W) (18" W)
SOUTH IMPERIAL AVENUE
SOUTH IMPERIAL AVENUE
IID DATE DRAIN IID DATE DRAIN WATER WATER WATER
(21"SS) (18" SS) (18" SS) (18" SS) (21"SS) (21"SS)
TRACT LINE TRACT LINE
RIGHT OF WAY RIGHT OF WAY
PHASE II LIMITS OF
CONSTRUCTION PHASE II LIMITS OF CONSTRUCTION PHASE II LIMITS OF CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
RIGHT OF WAY
6'
6'
6'
5'
5'
6'
38' 5'
6'
5'
6'
6'
5'
6'
110'
5' 38' 43'
38' 39.55'
110'
5.5'
6'
1 2 3 4 5 6
7 8 9 10
11 12 13
14 15
16 17 18 19 20 21 22 23 24 25 26 27 28 29
30 31
32 33
34 35 36 37 38 39 40 41 42 43 44 45 46
47 48 49 50 51 52 53 54 55 56 57 58
59 69
5'
5'
110'
37.97' 19.09'
TRACT LINE
5'
5'
5'
1'
86 87
88 89
90 100 99 98 97 96 95 94 93 92 91 101
102 103 104 105 106 107 108 109 110 111 112
113
114
115 116 117 118 119
120
121 122 123 124 125
126
127
5'
5.5'
129
130
131 20' 132 133
134
135
136 137 138 139 140 141 142
143
144
145 146 147 148
2'
149 150
151 152 153 154 155
156
157
158 2'
2'
2'
9'
9'
9'
9'
9'
20'
20'
20'
159
160 161
5'
162 163
164
165
Point Table
Point #
1 2
3 4
5 6
789
10 11
1213141516171819
20 21
222324252627
Northing
1860742.21
1860702.231860642.271860542.301860442.351860342.451860242.551860142.681860042.77 1859942.91
1859843.061859743.171859643.291859552.091860744.351860644.381860544.421860523.491860444.441860349.501860244.501860230.581860144.531860044.59 1859994.51
1859944.601859937.67
Easting
6770838.306770839.306770840.786770843.276770845.756770851.856770858.036770864.226770870.406770876.586770882.766770888.956770895.136770900.786770924.276770926.756770929.236770931.756770931.726770934.236770936.686770939.036770939.166770941.656770942.726770944.136770946.30 Description
WESTERLY FACE OF CURB/MATCH
CATCH BASIN
WESTERLY FACE OF CURBWESTERLY FACE OF CURB
WESTERLY FACE OF CURB/GRADE BREAK
WESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACEWESTERLY A.C DIKE FACE WESTERLY A.C DIKE FACE/END OF PHASE II CONSTRUCTION
EASTERLY FACE OF CURB/MATCH
EASTERLY FACE OF CURBEASTERLY FACE OF CURB
STREET LIGHT
EASTERLY FACE OF CURB/GRADE BREAK
SW DRAIN
EASTERLY FACE OF CURB
STREET LIGHT
EASTERLY FACE OF CURBEASTERLY FACE OF CURB
SW DRAIN
EASTERLY FACE OF CURB
STREET LIGHT
Point Table
Point #
282930
31 3233343536373839
40 41
4243444546474849
50 51
525354
Northing
1859844.651859744.68
1859615.021859590.64
1859597.68
1859592.84
1860743.40
1860643.441860543.441860443.52
1860343.531860243.581860143.591860043.651859943.631859843.66 1859743.741859643.74
1859552.191860743.28
1860643.31
1860543.371860443.371860343.431860243.431860143.47
1860043.52
Easting
6770946.61
6770949.09
6770952.31
6770977.49
6770959.91
6771004.046770886.286770888.776770891.256770893.73
6770896.21
6770898.706770901.186770903.666770906.146770908.63
6770911.11
6770913.596770915.866770881.296770883.77
6770886.21
6770888.73
6770891.11
6770893.706770896.186770898.66
Description
EASTERLY FACE OF CURBEASTERLY FACE OF CURB
END OF CURVE
BEGINNING OF CURVE
MIDDLE OF CURVE
STREET LIGHT
TRACT LINE/MATCH
TRACT LINETRACT LINE
TRACT LINE/END TRANSITION
TRACT LINETRACT LINETRACT LINETRACT LINETRACT LINETRACT LINETRACT LINETRACT LINE
TRACT COR/MONUMENT
ROW CENTERLINE/MATCH
ROW CENTERLINEROW CENTERLINE
ROW CENTERLINE/END TRANSITION
ROW CENTERLINEROW CENTERLINEROW CENTERLINEROW CENTERLINE Point Table
Point #
5556575859
60 61
62 63
64 656667686970
71 727374757677787980
81 Northing
1859943.531859843.58
1859743.61
1859643.591859552.151859591.641859592.381859595.541859592.961859593.871859594.621859594.99 1859595.01
1859595.301859552.971859553.641859554.201859554.401859555.151859555.891859556.621859556.991859557.241859562.001859563.951859607.231859606.62 Easting
6770901.156770903.63
6770906.11
6770908.596770910.866771110.856771210.856771299.486771310.576771410.856771510.856771560.566771580.56 6771593.32
6771010.896771110.85
6771184.92
6771210.856771310.856771410.856771510.856771560.85
6771593.32
6771310.796771580.796771592.786771510.85
Description
ROW CENTERLINEROW CENTERLINEROW CENTERLINEROW CENTERLINEROW CENTERLINE
NORTHERLY FACE OF CURBNORTHERLY FACE OF CURB
STREET LIGHT
CATCH BASIN
NORTHERLY FACE OF CURBNORTHERLY FACE OF CURB
NORTHERLY FACE OF CURB/GRADE BREAK
CATCH BASIN
NORTHERLY FACE OF CURB/MATCH
SOUTHERLY EPSOUTHERLY EPSOUTHERLY EPSOUTHERLY EPSOUTHERLY EPSOUTHERLY EPSOUTHERLY EP
SOUTHERLY EP/START TRANSITION
SOUTHERLY EP/MATCH
SDMHSDMH
ROW LIMITROW LIMIT
Point Table
Point #
828384
85 8687888990
91 929394
95 9697
9899
100
101
102103104105106107108
Northing
1859605.881859605.131859604.391859603.641859602.901859602.851859602.551859644.991859645.851859745.851859845.821859945.761860045.761860145.701860245.671860345.67 1860445.61
1860545.581860645.521860745.491860744.651860644.68
1860544.71
1860444.741860344.771860244.821860144.83
Easting
6771410.856771310.856771210.856771110.856771010.856771004.636770964.636770963.606770998.606770996.126770993.636770991.156770988.676770986.196770983.706770981.226770978.746770976.266770973.756770971.266770936.276770938.756770941.266770943.726770946.206770948.656770951.26 Description
ROW LIMITROW LIMITROW LIMITROW LIMITROW LIMIT
40-FT EASEMENT
ROW CORNER
ROW LIMIT
TOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALETOP OF SWALE
ROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMIT Point Table
Point #
109110
111
112113114
115
116117118119120
121
122123124
125
126127128129130
131
132133134
135
Northing
1860044.881859944.92
1859844.95
1859744.98
1860742.11
1860641.92
1860541.95
1860442.011860342.01
1860242.041860142.071860042.131859942.141859842.191859742.22 1859642.25
1859544.71
1859630.321859602.261859506.471859581.621859552.401860744.881860644.931860544.931860444.991860345.02 Easting
6770953.62
6770956.106770958.586770961.096770826.276770828.796770831.276770833.85 6770836.21
6770838.72
6770841.176770843.686770846.16
6770848.62
6770851.13
6770853.61
6770856.036770963.946770992.406771145.486770915.136770944.266770946.286770948.756770951.23 6770953.71
6770956.20
Description
ROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMITROW LIMIT
PCC RAMP CORPCC RAMP COR
TBM NO. 2
MONUMENTMONUMENT
TOP SWALETOP SWALETOP SWALETOP SWALETOP SWALE
Point Table
Point #
136137138139140
141
142143144145146147148149150
151
152153154155156157158159160
161
162
Northing
1860245.071860145.081860045.161859945.171859845.221859745.23 1859645.21
1859625.351859616.851860736.121860645.161860545.16
1860445.21
1860345.251860245.301860145.301860045.381859945.391859845.441859745.451859645.431859625.581860704.891860704.361860349.971859995.171859542.06 Easting
6770958.686770961.166770963.646770966.12
6770968.61
6770971.096770973.576770974.076770994.286770955.496770957.756770960.23 6770962.71
6770965.196770967.676770970.166770972.646770975.126770977.606770980.096770982.576770983.066770946.596770925.106770956.076770964.886770895.57 Description
TOP SWALETOP SWALETOP SWALETOP SWALETOP SWALETOP SWALETOP SWALETOP SWALETOP SWALE
BOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALEBOT SWALE
HEADWALL
CATCH BASIN
SCUPPER OUTLETSCUPPER OUTLET
LIMITS OF CONST.
Point Table
Point #
163
164
165
166
167168169
170
171
172
Northing
1859547.181859547.18
1859547.91
1859548.651859549.38
1859550.12
1859550.851859551.591859552.191859547.19
Easting
6770895.266770910.896771010.886771110.886771210.886771310.886771410.886771510.876771593.196771593.23 Description
C2BC2BC2BC2BC2BC2BC2BC2BC2B
LIMITS OF CONST.
966967
968
970969 971
972
976
976
977
977
E SIGNAL
SS
41+00S +00S PROPOSED IID POWER POLE SD
0+00E 1+00E 2+00E 3+00E 4+00E 5 00E
ROW
ROW ROW ROW ROW
(48"W) (48"W) (48"W)
(18" W) (18" W) (18" W)
TOP OF SLOPE
(18" W)
(18" SS)
(EP EL. 971.89)
ROW
ROW
TBM#2
EL 972.94
PHASE II LIMITS OF
CONSTRUCTION
DANENBERG DRIVE
14 46
59 69 70
71 72
73 74
5'
100'75 76
77 125
128
130 5'555
162 5'
163
164
165
166
167 168 169 170 171 172
970
969
968
975
973
974
970.88
SIGNAL
SD
SS
40+00S
S
SS
SD SD SD
SIGNAL
0+00E 1+00E 2+00E 3+00E 4+00E 5+00E 6+00E 7+00E 8+00E 9+00E E
TOP OF SLOPE
TOE OF SLOPE (UG) (UG) (UG)
(18" SS)
(FL EL. 970.76)
(EP EL. 971.89)
PHASE II LIMITS OF
CONSTRUCTION
ROW ROW ROW ROW
13 14
30 31 32 33
45 58
60 61 62 63 64 65 66 67 68
69 70 72
73 74
6.5'
5'
3.5'
5'
38'
3.5'
5'
5'
5'
5'
5'
6.5'
5'
3.5'
6.5'
38'
00'75
76 78 79
82 81 80 86 85 84 83
87 88
89 124 126
127
DANENBERG DRIVE DANENBERG DRIVE
129
130
142
143 144
156
157
5'
5'
5'
5'
5'
20 0' 40' 80' 120'
SCALE: 1"=40'
40'
HORIZONTAL CONTROL PLAN
STATION 29+00
PHASE II START DEMOLITION
STATION 40+96.58
END OF PHASE II DEMOLITION
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
RE
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
"C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL
CONTROL POINT
THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE
HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONGSTATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD).
PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03FEET + 1000 FEET = 985.97
SEE BELOW FOR DANENBERG DRIVE
STATION 9+26.30E END OF
PHASE II
SEE ABOVE FOR IMPERIAL HIGHWAY
18.c
Packet Pg. 679
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) (OHT) (OHT)
SIGNAL
40+00S 41+00S SIGNAL 0+00E 1+00E
E
S IMPERIAL AVE.
TRACT LINE
10.9'
TRACT LINE
30.0'
7 4
4 7
14 34
35 PP# PW-0301
OHE
(18" SS)
S=0.70%
S=2.00%
S=0.52%
S=2.00%
TC 973.73
FL 973.23
6.5' 5.0'
PHASE II LIMITS OF
CONSTRUCTION
38.0' 33.0'
TC 973.59
FL 973.09
110.0'
S=0.70%
S=0.27%
TC 974.14
FL 973.64
30.0'
26 12
6 21
18 1
5 4
11 ROW
(18" W)
EASEMENT
(18" W)
PHASE II LIMITS OF
CONSTRUCTION
RIGHT OF WAY
SW 974.17
SW 974.24
40.0'
5.0'
3.5'
PHASE II LIMITS OF
CONSTRUCTION
PHASE II LIMITS OF
CONSTRUCTION
DANENBERG DRIVE
S=1.50%
S=1.50%
1 1
1 31
31 6
5 26
26 7
SW 974.30
SW 974.00
SW 974.26
12 12
18 18
18 S=2.00% S=2.00%
S=2.00%
SW 973.70 SW 973.35
11 S=1.50%
S=1.50%
S=1.50%
(18" SS)
(18" SS)
10 10
S=0.19% S=0.19%
S=0.19%
6.0' 6.0' 10.0'
10 60.0'
TC 973.35
FL 972.85
24 23
STA 40+59.86
℄ ℄
STREET/ROW CENTERLINE
24 24
22 3.5'
5.0'
6.0'
6 6
5 5
20 20 26
20 26
20 26
22 22
22 9.0'
2.0'
9.0'
5.0' 5.0'
7 STA 41+3.09SSTA 0+12.53E
19 25
31 7
(18" W)
INSTALL NEW
JUNCTION BOX.
STA 0+94.61E
8.0'
28.4'
37 EP 975.57
TP 974.87
25 25
℄
5.0'
5.0'
5.0'
36 5.0'
S=0.94% S=0.70%
25 10
10 ℄
TP 974.83 TP 974.44
PHASE II LIMITS OF
CONSTRUCTION
TP 974.09
ROW CENTERLINE
℄
TP 973.74 3 3
3 S=0.70%
5.0'
5.0'
5.0' 11 11 11
TC 973.59
FL 973.59
7.1'
7.1'
TC 974.00
FL 973.50
TC 974.14
FL 973.64
S=0.74%SW 974.26
SW 973.93
7 30.0'
23 14.6'
31 31
S=0.27%
S=0.70%
PAVEMENT SECTION CHANGES
S=7.5%
26 4.17'
37.9'
6 5 17
6 5
4 4
4 4 4
STA 1+50.00E
STA 1+00.00E
STA 0+93.48E
TC 973.70
FL 973.20
TC 974.21
FL 973.71
STA 0+41.75E
STA 40+29.67W
TC 973.56
FL 973.56
S=0.74%
TC 973.93
FL 973.43
STA 0+66.91E
STA 40+00.00W
8.0'
5.0'
R25
S=7.88% SW 974.04
S=6.30%
S=0.74%
FL FL FL
FL FL
GRADE BREAK
GRADE BREAK
BLOW UP DETAIL SHEET
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE1601 N. Imperial Ave.El Centro, CA 92243 (760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042 SHEET 21_BLOW-UP DETAIL SHEET.dwg 06/10/2022 11:16 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 INSTALL 7-INCHES OF A.C. PAVEMENT OVER 26-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS A-A THROUGH C-C ON SHEET 9.
INSTALL 0.20 FOOT OF A.C. PAVEMENT AT COLD PLANED/HEADER CUT AREA PER DETAIL A ON SHEET 22.INSTALL 2" X 8" PRESSURE TREATED BOARDS. SECURE THE 2" X 8" PRESSURE TREATED BOARDS WITH 2 FOOT LONG- 2" X 4" STAKES 3 FEET ON CENTER. SECURE THE BOARDS TO THE WOOD STAKES WITH FOUR (4) 16 CC SINKER NAILS. SEE DETAIL B ON SHEET 22.
INSTALL 6-INCH P.C.C. CURB AND GUTTER PER CITY OF EL CENTRO STANDARD DETAIL EC-200. SEE DETAIL C ON SHEET 22.INSTALL 4-INCH P.C.C. SIDEWALK OVER 4-INCHES OF GRANULAR SAND PER CITY OF EL CENTRO STANDARD DETAIL EC-400.
SEE DETAIL D ON SHEET 22.
INSTALL NATIVE PARKWAY BETWEEN P.C.C. CURB AND GUTTER AND P.C.C. SIDEWALK PER CITY OF EL CENTRO STANDARD DETAIL EC-400. SEE DETAIL D ON SHEET 22.
INSTALL P.C.C. HANDICAP RAMP PER CALTRANS STANDARD PLAN A88A, CASE A. SEE DETAIL L ON SHEET 23. INSTALL P.C.C.
HANDICAP RAMP OVER 6-INCHES OF CLASS II BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUMDENSITY PER ASTM D-1557. SEE BLOW-UP DETAIL 1 ON SHEET 21.
CONTRACTOR TO ADJUST THE EXISTING MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE A 12-INCH DEEP 12-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE SANITARY SEWER MANHOLE PER DETAIL F ON SHEET 22.
CONTRACTOR TO ADJUST THE EXISTING WATER VALVE RISERS TO FINISH GRADE AFTER PAVING OPERATIONS ARECOMPLETE. PLACE AN 8-INCH DEEP 8-INCH WIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE WATER VALVE RISER PER CITY OF EL CENTRO STANDARD DETAIL EC-701. SEE DETAIL G ON SHEET 22.THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN PLACE THE EXISTING SURVEY MONUMENT. CONTRACTOR TO ADJUST THE MONUMENT WELL FRAME AND COVER TO FINISH GRADE. CONTRACTOR TO PLACE AN 8 1/2-INCH DEEP, 8-INCHWIDE, 5,000 PSI CONCRETE RING AROUND THE EXTERIOR CIRCUMFERENCE OF THE MONUMENT WELL FRAME AND COVER.
SEE DETAIL H ON SHEET 22. SHOULD ANY SUCH MONUMENTS OR BENCHMARKS BE REMOVED, DAMAGED, OBLITERATED OR
ALTERED BY THE CONTRACTOR'S OPERATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVATION OR
PERPETUATION BY THE PROPER RESETTING OF THE SAME AS PER THE SUBDIVISION MAP ACT, THE PROFESSIONAL LAND SURVEYORS ACT AND TO THE SATISFACTION OF THE COUNTY SURVEYOR/DIRECTOR OF PUBLIC WORKS DEPARTMENT. SEEGENERAL NOTE ON SHEET 1 AND SPECIFICATIONS FOR PERPETUATION OF MONUMENTATION.
AFTER THE PLACEMENT OF THE P.C.C. SIDEWALK, CLASS 2 BASE SHOULDER OR PAVEMENT IS COMPLETED PLACE NATIVE MATERIAL FLUSH WITH THE P.C.C. SIDEWALK, CLASS 2 BASE OR EDGE OF PAVEMENT/HEADER BOARD SURFACE FOR AHORIZONTAL DISTANCE OF 5-FEET TO DAY LIGHT OR AS ILLUSTRATED BY THE HATCH AREA. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557.APPLY LIGHT MIST OF WATER TO THE SURFACE OF THE NATIVE MATERIAL AFTER FINAL GRADING IS SATISFACTORILY COMPLETED.
AFTER THE PLACEMENT OF THE A.C. DIKE/ P.C.C. CURB AND GUTTER IS COMPLETED, GRADE THE NATIVE MATERIAL FROM THE BOTTOM OF THE A.C. DIKE/P.C.C. CURB AND GUTTER TO A HORIZONTAL DISTANCE OF 5-FEET TO DAYLIGHT. COMPACT NATIVE MATERIAL TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL NEW STORMWATER MANHOLE. ADJUST THE MANHOLE FRAME AND COVER TO FINISH GRADE AFTER PAVING OPERATIONS ARE COMPLETE. PLACE A 12-INCH WIDE, 12-INCH DEEP, 5,000 PSI CONCRETE RING AROUND THE EXTERIORCIRCUMFERENCE OF THE MANHOLE FRAME AND COVER. SEE DETAIL S ON SHEET 25.
INSTALL STORM WATER CATCH BASIN PER DETAIL J ON SHEET 23.INSTALL NEW 12-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL NEW 18-INCH DIAMETER PS115 PVC STORMWATER PIPELINE PER TRENCH DETAIL I ON SHEET 23.INSTALL TRUNCATED DOMES PER CALTRANS STANDARD PLANS DETAIL A88A OR DETAIL L ON SHEET 23.INSTALL NEW "TYPE A" A.C. DIKE PER MODIFIED CALTRANS STANDARD PLAN A87B. SEE DETAIL M ON SHEET 23. APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION. INSTALL NEW P.C.C. CURB AND GUTTER TO A.C. DIKE TRANSITION PER DETAIL T ON SHEET 25.
INSTALL NEW TYPE 'A' A.C. DIKE TRANSITION FROM 6-INCH HIGH TO 1-INCH HIGH A.C. DIKE. SEE DETAIL M ON SHEET 23.
APPLY TACK COAT BETWEEN A.C. PAVEMENT SURFACE AND A.C. DIKE PER SECTION 39 OF CALTRANS STANDARD SPECIFICATIONS LATEST EDITION.
INSTALL A 21-FOOT-WIDE, EARTH-LINED SWALE AS ILLUSTRATED BY THE GRADE ON THE IMPROVEMENT PLANS AND SECTIONS A-A THROUGH C-C ON PLAN SHEET 9.
INSTALL STREET LIGHT PER CITY OF EL CENTRO STANDARD DETAIL EC-900 OR DETAIL P ON SHEET 24.INSTALL NEW ELECTRICAL UNDERGROUND CONDUIT(S) AND OTHER ANCILLARY FACILITIES PER THE DRAWINGS AND SPECIFICATIONS PREPARED BY THE IMPERIAL IRRIGATION DISTRICT (IID) POWER DIVISION. THE IID'S ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE IID'S REQUIREMENTS UNDER IID'S SUPERVISION. AMINIMUM HORIZONTAL CLEARANCE DISTANCE OF 3-FOOT SHALL BE MAINTAINED FROM THE IID'S FACILITIES TO THE CITY INFRASTRUCTURE.INSTALL NEW NO. 3 1/2 NON-TRAFFIC PULL BOX PER 2018 CALTRANS STANDARD PLANS ES-8A.INSTALL NEW 3-INCH SCHEDULE 40 CONDUITS PER TRENCH DETAIL K ON SHEET 23 FOR THE FUTURE SIGNALIZATION ELECTRICAL LINE INSTALLATION.
INSTALL 8-INCHES OF CLASS II BASE MATERIAL FROM THE TOP OF THE HEADER BOARD TO A HORIZONTAL DISTANCE OF 5-FEET. COMPACT CLASS II BASE MATERIAL TO 95% PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
GRADE EXISTING NATIVE MATERIAL SURFACE TO FINISH DESIGN GRADE AS ILLUSTRATED ON THE IMPROVEMENT PLANS.
COMPACT THE NATIVE MATERIAL FINISH SURFACE TO 90 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
INSTALL A 12-INCH DIAMETER DUCKBILL CHECK VALVE AT THE DOWNSTREAM PIPE OF THE STORM DRAIN MANHOLE.
SECURE THE VALVE WITH 316 STAINLESS STEEL HARDWARE.
INSTALL STORM WATER DROP INLET PER DETAIL Q ON SHEET 24.
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK SLOPE PROTECTION (ROCK GRADATION FOR 7-INCH THICK LAYER) PER SECTION 72-4 OF 2018 CALTRANS STANDARD SPECIFICATIONS. INSTALL RSP FABRIC TYPE "8" UNDERNEATH THE RSP PERSECTIONS 72 AND 96-1.02I OF 2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL 5-INCHES OF A.C. PAVEMENT OVER 18-INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95-PERCENT OF MAXIMUM DENSITY PER ASTM D-1557. SEE SECTIONS D-D THROUGH E-E ON SHEET 10.
INSTALL THE PREVIOUSLY REMOVED AIR AND VACUUM RELEASE VALVE PER DETAIL R ON SHEET 25.INSTALL 3 INCHES OF A.C. PAVEMENT OVER 9 INCHES OF CLASS 2 BASE. COMPACT THE CLASS 2 BASE MATERIAL TO 95 PERCENT OF MAXIMUM DENSITY PER ASTM D-1557.
CORE EXISTING STORM DRAIN MANHOLE WALL AND INSTALL A NEW 18-INCH DIA. STORMWATER PIPELINE PER DETAIL O ONSHEET 24. MODIFY EXISTING MANHOLE BOTTOM SHELF TO CREATE A SMOOTH FLOW CHANNEL. 1 2
3 4
5 6789
10 11
141617121315
CONSTRUCTION KEYNOTES
18 19
20 21
22 23
24 252627282930
31 323334
EXISTING A.C. PAVEMENT TO REMAIN.EXISTING P.C.C. CURB AND GUTTER TO REMAIN.EXISTING P.C.C. SIDEWALK TO REMAIN.EXISTING SANITARY SEWER PIPELINE TO REMAIN.EXISTING SANITARY SEWER MANHOLE TO REMAIN.EXISTING WATER METER TO REMAIN.EXISTING WATER PIPELINE TO REMAIN.EXISTING WATER VALVE RISER AND COVER TO REMAIN.EXISTING FIRE HYDRANT TO REMAIN.EXISTING 6' CHAIN LINK FENCE TO REMAIN.EXISTING STORMDRAIN MANHOLE TO REMAIN.EXISTING STORMWATER CATCH BASIN TO REMAIN.EXISTING STREET LIGHT TO REMAIN.EXISTING POWER POLE TO REMAIN.EXISTING GUY WIRE TO REMAIN.EXISTING 6' WOODEN FENCE TO REMAIN.EXISTING 3" DIAMETER STEEL PIPE SWING GATE.EXISTING IID CONCRETE HEADWALL.
EXISTING KEYNOTES
621
3 4579
10131214
8 1516
17 18
11 0' 10' 20' 30'
SCALE: 1"=10'
10'
HANDICAP RAMP BLOW UP DETAIL AT NORTHEAST CORNER OF DANENBERG DRIVE AND SOUTH IMPERIAL AVENUE SCALE 1"=10'
1 6,7 21
21 EXISTING IID CONCRETE GATE STRUCTURE.EXISTING DEAD END BARRICADE.EXISTING 3" DIAMETER STEEL PIPE FENCE TO REMAIN.EXISTING 48" DIAMETER RCP RAW WATER PIPELINE TO CITY OF EL CENTRO WTP.EXISTING 6" DIAMETER IID OVERFLOW PIPELINE.EXISTING 30" CONCRETE DIAMETER PIPELINE.EXISTING ABANDONED CONCRETE LINED IID DAHLIA LATERAL.EXISTING NATIVE EARTH DATE DRAIN TO REMAIN.EXISTING OVERHEAD SECONDARY POWER LINE TO REMAIN.EXISTING ELECTRICAL SERVICE POLE TO REMAIN.EXISTING AGRICULTURAL DRAIN WATER PUMP TO REMAIN.EXISTING POWER POLE AND TRANSFORMER FOR AGRICULTURAL DRAIN WATER PUMP STATION TO REMAIN.EXISTING 48-INCH RAW WATER PIPELINE JUNCTION MANHOLE.EXISTING STORMWATER PIPELINE TO REMAIN.EXISTING IID OVERHEAD PRIMARY POWER LINES.EXISTING AT&T OVERHEAD TELEPHONE LINES.EXISTING RP MONUMENT NOT FOUND, 60' NORTH OF NW CORNER OF TRACT 84 PER PM 9-100. 22 20
19 23
24 273028
21 25
26313229333435
EXISTING RP MONUMENT NOT FOUND, 30' NORTH OF NW CORNER OF TRACT 84 PER FM 19-35.EXISTING FOUND RP(IRON PIPE WITH BRASS CAP) TO NW CORNER OF TRACT 84 PER IMPERIAL COUNTY TIE CARD AND FM 20-86, 28.4' EAST AND 30' NORTH OF NW CORNER OF TRACT 84.EXISTING IID UNDERGROUND DATE DRAIN PIPELINE TO REMAIN.EXISTING AT&T ENCLOSURE TO REMAIN.EXISTING IID POWER DISTRIBUTION ENCLOSURE TO REMAIN.EXISTING SPECTRUM ENCLOSURE TO REMAIN.EXISTING UNDERGROUND ELECTRICAL, SPECTRUM, AND AT&T DISTRIBUTION LINES TO REMAIN.EXISTING UNDERGROUND SOUTHERN CALIFORNIA GAS PIPELINE.EXISTING CATHODIC PROTECTION SYSTEM TO REMAIN.EXISTING RP MONUMENT NOT FOUND, 800' NORTH OF SE CORNER OF TRACT 60 PER FM 20-86. 36373839404142434445
18.c
Packet Pg. 680
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
CAP DETAIL
WATER
CAST IRON VALVE BOX
6"
3' MIN. COVER
VALVE(NOT IN THIS ASSEMBLY)
SHAFT
EXTENSION
POUR 2'-0" X 2'-0" X 6" DEEP CONC. AS REQUIRED
7 1/2"
(OR SIMILAR)
VALVE BOX AND COVER ASSEMBLY DETAIL
CITY OF EL CENTRO STANDARD DETAIL EC-701
NTS
G
CONC. RING
(5,000 P.S.I.)
MONUMENT TYPE "B"
MON NOT TO SCALE
CONCRETE FILL
AROUND FRAMEAND COVER
F'c=5000 P.S.I. H.R.
(7 SACK MIX)
24"
10 3/4"
8"
SET BRASS DISK OR CAP WHICH
CLEARLY DISPLAYS THE CALIFORNIA
REGISTRATION NUMBER OF THE
LAND SURVEYOR OR CIVIL
ENGINEER FOR THE ESTABLISHING
THE MONUMENT
CLASS II AGGREGATE
BASE OR PIT RUN SAND
WITH A SAND
EQUIVALENT OF >30
COMPACTED TO 90%
MAX. DENSITY.
REINFORCED
CONCRETE CYLINDER5"-6" DIA. MINIMUM 24"
LONG
CAST IRON FRAME
AND COVERALHAMBRA FOUNDRYA-2925 OR ANAPPROVED EQUAL
PAVEMENT FINISHED
SURFACE
1/2" MIN
ALL AROUND
12" MIN 4"
18" MIN.
MONUMENT CYLINDER/FRAME AND COVER
CITY OF EL CENTRO STANDARD DETAIL EC-1200 B
H
NOTES:
24"
WHENEVER PRACTICABLE, THE FRAME AND COVER SHALL BE PLACED DIRECTLY OVER THE INLET OF THE STRUCTURE EXCEPT AS OTHERWISENOTED ON THE PLANS.
GRADE RINGS SHALL BE SET PLUMB.
PLACE CEMENT GROUT IN THE OPENINGS BETWEEN PRECAST MANHOLEUNITS AND GRADE RINGS FLUSH WITH THE INTERIOR AND EXTERIOR SURFACES PRIOR TO APPLYING THE RAVEN 405 (OR APPROVED EQUAL)
COATING OR COMPLETING BACKFILL WORK AROUND THE EXTERIOR OF THE MANHOLE.
1. 2.
3. MANHOLE FRAME AND COVER
SHALL BE ALHAMBRA FOUNDRY
A-1497 (SEWER) OR A-1325 (STORM
DRAIN) OR AN APPROVED EQUAL.
INSTALL A 1'-0" WIDE, 1'-0" DEEP CONCRETE
RING CIRCUMFERENTIALLY AROUND THEMANHOLE FRAME. PLACE THE CONCRETERING 3 8 INCH BELOW WITH THE EXISTING PAVEMENT OR 0.10 FEET ABOVE NATIVE
SURFACES. MANHOLE FRAME AND COVER TO
BE LOWERED 0.30 FEET BELOW GRADE PRIOR
TO PAVING. MANHOLE FRAME AND COVER
SHALL BE RAISED TO A VERTICAL POSITION 3 8
INCHES BELOW THE FINISH A.C. PAVEMENT
SURFACE AFTER PAVING OPERATIONS ARECOMPLETE.
PLACE CEMENT FLUSH WITH
THE INTERIOR AND
EXTERIOR SURFACES OF
THE MANHOLE ALONG ALL
CONCRETE JOINTS.
PLACE GRADE RINGS AS
REQUIRED TO ADJUST THE
MANHOLE COVER TO GRADE.
1'-0"
TYP.
ADJ. RING
11" MAX.
1'-0"
TYP.
3"
9"3
8 "
NTS
MANHOLE FRAME AND COVER F
8"
TYP.
3'-0"
TYP.
3'-0"
INSTALL 2-INCH THICK, 8-INCH HIGH PRESSURE
TREATED FORM BOARD.
INSTALL 24-INCH LONG HIGH PRESSURE TREATED 1 X
2 (FINISHED SIZE = 3/4-INCH X 1 1/2-INCH ) DOUGLAS
FIR TAPERED STAKES 3'-0" ON CENTER ALONG THEEXTERIOR PERIMETER OF THE PRESSURE TREATEDFORM BOARD. INSTALL TWO (2) NUMBER 8 GALVANIZED 2-INCH LONG NAILS TO SECURE THE
STAKE TO THE PRESSURE TREATED FORM BOARD.
HEADER FORM BOARD DETAIL
NTS
COLD PLANE DETAIL B
NTS
A
NOTES:
INSTALL NEW
A.C. PAVEMENT.
EXISTING A.C.PAVEMENT.
EXISTING BASE
MATERIAL.
INSTALL NEW
CLASS 2 BASE.
0.20' 2'-0"
2 1
3 COLD PLANE 2 FOOT WIDE X 0.20 FOOT DEEP AREA FOR THE FULL WIDTH OF THE A.C. PAVEMENT.
TACK COAT THE SAW-CUT A.C. PAVEMENT EDGE AND COLD PLANED AREA WITH A GRADE SS-1H EMULSIFIED ASPHALT AT AN APPROXIMATE RATE OF 0.05 TO 0.10 GALLON PER SQUARE YARD. THE SS-1HEMULSIFIED ASPHALT SHALL BE UNIFORMLY APPLIED PRECEDING THEPLACEMENT OF THE NEW ASPHALT CONCRETE. THE SURFACE SHALL
BE FREE OF WATER, FOREIGN MATERIAL OR DUST WHEN THE TACK COAT IS APPLIED.OVERLAY HEADER AREA TO MATCH NEW AND EXISTING A.C. SURFACES.
WHERE PAVEMENT IS INSTALLED ON A PROJECT ON MORE THAN ONE
DAY, A HEADER (AS HERE IN DESCRIBED) MUST BE PROVIDED AT THE CONSTRUCTION JOINT.
1 2
3 4
6-INCH P.C.C. CURB AND GUTTER DETAIL
CITY OF EL CENTRO STANDARD DETAIL EC-200
NTS
CL
2"
18"
1"
2"
R 3/4"
R 3/8"
12 1/2"
6"
R 1"
27"
ROADBED WIDTH TO THIS POINT
1"
6"
6" CURB FACE
SURFACING
2%
ASPHALT
2%
R 1/4"
6" MIN CLASS 2 BASE
COMPACTED TO 95% OF MAX
DRY DENSITY PER ASTM 1557.UNLESS OTHERWISE NOTED
LEVEL LINE
6"
NOTES:
REFER TO CURB & GUTTER JOINTS STANDARDS EC-210 FOR EXPANSION AND WEAKENEDPLANE JOINTS. SEE DETAIL X ON SHEET 33.
THE GUTTER SURFACE, CURB SURFACE, TOP OF CURB, AND SIDEWALK SURFACE SHALL RECEIVE A DOUBLETROWEL FINISH.THE CURB AND GUTTER EDGES SHALL BE PLACED TO LINE AND GRADE. VERTICAL ELEVATIONS SHALL NOT VARY MORE THAN ± 0.01' WITH MAXIMUM VARIANCE 0.02' FROM DESIGN GRADE OCCURRING IN ANY GIVEN 100 FOOT SECTION. THE HORIZONTAL CURB AND GUTTER EDGES SHALL NOT VARY MORE THAN 1/4" IN ANY GIVEN 100-FOOT SECTION.
SIDEWALK WILL BE INSTALLED AND ADJOINED TO THE CURB AND GUTTER AS ILLUSTRATED ON THE PLANS.
THE P.C.C. SHALL CONTAIN 7 SACKS OF CEMENT PER CUBIC YARD AND ATTAIN A COMPRESSIVE STRENGTH OF 5,000 PSI AFTER 28 DAYS.
1 2345
C
6'-6" MIN. WIDTH AS SHOWN ON PLAN
5'-0" MIN.
PL
FLAT 1/4" PER FT.
PARKWAY
R1/2"
NON-CONTIGUOUS
WEAKENED PLANE
JOINT 2" (BEYOND)
4"
1/4" PER FT.
4"
WEAKENED PLANE
JOINT 2" (BEYOND)
R1/2"
PL
CONTIGUOUS
WIDTH AS SHOWN ON PLAN
5'-0" MIN.
R1/2"
NOTES:1. CONCRETE SHALL BE CLASS B, 5000 PSI.2. SEE STANDARD DRAWING EC-401 & EC-402 FOR ADDITIONAL INFORMATION.3. LIGHT BROOM FINISH SHALL BE USED FOR SIDEWALK. (TYP.)
PER PLANS
PER PLANS
NOTE:PARKWAY ELEVATION
SHALL BE 1-INCH BELOW THE
TOP OF CURB ELEVATION AND
1-INCH BELOW THE TOP OF
SIDEWALK ELEVATION.
8"
3"
INSTALL 4-INCHES OF
GRANULAR SAND MATERIAL.COMPACT THE GRANULAR
SAND MATERIAL TO 95
PERCENT MAXIMUM DENSITYPER ASTM D-1557.
5-FOOT WIDE P.C.C. SIDEWALK DETAIL
CITY OF EL CENTRO STANDARD DETAIL EC-400
NTS
D
2'
TOP OF PAVEMENT
1"
E
INSTALL 4-INCHES OF
GRANULAR SAND
MATERIAL. COMPACT THE
GRANULAR SAND MATERIAL
TO 95 PERCENT MAXIMUM
DENSITY PER ASTM D-1557.
NATIVE MATERIAL
TYPICAL STOP AND STREET NAME SIGN DETAIL
NTS
R=3/8"
WEAKENED PLANE JOINT
1/4"
N.T.S.
3/16"
R=3/8"
N.T.S.
1/4"
R=3/8"
R=3/8"
1/4"
EXPANSION JOINT
ASPHALTIC JOINT SEALER
OR CELOTEX FIBER BOARD
321
PLACE WEAKENED PLANE JOINT AT
APPROXIMATELY 15' INTERVALS.
PLACE EXPANSION JOINT AT APPROXIMATELY
30' INTERVALS.
PLACE TOOLED JOINT AT APPROXIMATELY 5'
INTERVALS.
NOTES:
8" DIA.
7'-0" STREET SIGN ONLY
2'-0"
IN PARKWAY
1 3/4" x 1 3/4" x 10'
CLASS B
6"
1/2"R
2'-6"
CONCRETE
3"
1'-6"
2"x30" 12 GA.
ANCHOR
2 1/4"x18"
12 GA
SLEEVE
12 GA. SQUARE TUBE POST
6"
MIN.
FOR STREETS WITH ALLOWED SPEEDS GREATER THAN 25
MPH, LETTERING SHALL BE LARGER THAN 4" HEIGHT.
9'-8-1/2" STOP AND STREET SIGN
7'-0"
1.) SIGN MATERIAL, SIZES AND FABRICATION
A) SIGN BLANK MUST BE EXTRUDED BLADE ALUMINUM, 5052-H38 ALUMINUM ALLOY.
B) SIGN BLANK DIMENSIONS ARE 6" HIGH BY 24" MIN TO 48" MAX LONG AS REQUIRED.
C) SIGN SHEETING MUST BE HIGH PERFORMANCE WIDE ANGLE PRISMATIC LENS REFLECTIVE WHITE (SILVER) SHEETING (3M SCOTCHLITE DIAMOND GRADE VIP 3990). THE BACKGROUND MUST BE SCREEN PRINTED BLUES USING REFLECTIVESHEETING MANUFACTURER MATCH COMPONENT INK (3M 883I) D) THE LETTER SIZING AND SPACING MUST MEET FHWA SPACE GUIDELINES. MINOR VARIATIONS AS APPROVED BY THE CITY ENGINEER.
E) THE CITY EMBLEM MUST BE A BLUE GRAPHIC ON A WHITE BACKGROUND.
EXCEPTION: NO CITY EMBLEM REQUIRED FOR INTERSECTING SECONDARY STREETS.
F) STREET NAME MUST APPEAR ON EACH SIDE OF THE SIGN BLANK.
G) STREET NAME SIGN MAY BE FABRICATED USING REFLECTIVE SHEETING MANUFACTURED MATCHED COMPONENT ELECTRONIC CUTTABLE FILMS ( 3M E.C. 1175).
H) SLIGHT LAYOUT VARIATIONS ARE PERMITTED AND MUST BE APPROVED BY THE CITY ENGINEER.
1.) POST MATERIALS
A) POST MUST BE A TELESPAR 2" SQUARE POST (HOT DIPPED GALVANIZED INSIDE AND OUTSIDE) OR APPROVED EQUAL. ALL SIGNS POST SHALL BE 12 GAUGE STEEL.
B) ANCHORS MUST BE TELESPAR 30" OR 36"- 2 14" SQUARE ANCHORS AND 2 12 " SLEEVES OR APPROVED EQUAL. ALL ANCHORS AND SLEEVES SHALL BE 12GAUGE STEEL MIN.
C) DRIVE RIVETS MUST BE 3 8" STEEL COATED IN NICKEL, ZINC, OR CHROMIUM TO RESIST RUST (2 RIVETS MINIMUM REQUIRED PER POST/ ANCHOR ASSEMBLY).
D) ALUMINUM CAP POST BRACKET MUST BE 5.5" WIDE FOR STREET NAME SIGN UP TO 24". A 12" WIDE SADDLE SHALL BE UTILIZED FOR STREET NAME SIGN UP TO 48".
BRACKET MUST BE SIZED TO FIT EXTRUDED BLADE SIGNS PER MANUFACTURER SPECIFICATIONS.
E) ALUMINUM CROSS SADDLE BRACKET MUST BE 5.5" WIDE FOR STREET NAME SIGN UP TO 24”. A 12” WIDE SADDLE SHALL BE UTILIZED FOR STREET NAME SIGNS UP TO 48”. BRACKET MUST BE SIZED TO FIT EXTRUDED BLADE SIGNS PER MANUFACTURER SPECIFICATIONS.
FOR INTERSECTING SECONDARY STREETS(COLLECTOR &
LOCAL RESIDENTIAL), USE 4" UPPERCASE AND NO CITYEMBLEM. ALL OTHER DIMENSIONS AND INSTALLATION SAME AS STANDARD STREET NAME SIGN. BLOCK
NUMBERS ARE NOT SHOWN ON INTERSECTING
SECONDARY STREETS.
22 DETAIL SHEET
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
R
E
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:06 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 4-8 4-8 4-8 4-8 4-9 4-9 4-8 4-9
18.c
Packet Pg. 681
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 5'-0" 2'-0"
4'-0"
3/16"
DETAILSEE OPENING
6" MIN.
6" 2'-0"
1/4"/FT.
2'-6"
CLEAR
OPENING
SEE NOTE 1
1/2" X 10" ANCHORBOLTS AT 24" O.C.
1" CLEAR.
DETAIL
6"
MIN.
6"
2"
4"
SEE NOTE 3
5 - #5 REINF. BARS.
1/4"/FT.
2 1/2" CLR.
8" MIN.
MIN.
6"
SLOPE TO OUTLET 1/2"/FT.
SECTION
5 - NO. 5
5'-0"4'-0"
6"
SLOPE
4'-0" (SEE NOTE 1)
13'-0"
4'-0"
SLOPE
5" SLOPE
PLAN
5'-0"
CURB FACE.
FLOWLINE SHOWN ONPLAN AND PROFILE.
EXPANSION
JOINT.
5 - NO. 5 BARS
AT 4" ± O.C.
NO. 5 BARS AT 12" O.C.
VERT. & HORIZ. (TYP.)
24" X 24" CAST IRON FRAME
AND COVER "NEENAH" R-1810.
FLOWLINE SHOWN ONPLAN AND PROFILE.
3/8" A.C. ABOVE
CONCRETE.
A.C PAVING.
CURB FACE
#5 REINF. BARS,
HORIZONTAL FULL LENGTH
OF APRON AND WALL.
SEE PIPE DIAMETER ON
IMPROVEMENT PLANS.
MIN. 2 1/2"
CONC. COVER ALL
REINF. STEEL.
24" X 24" CAST IRON
FRAME AND COVER.
#5 REINF. BARS AT 12"
O.C. BOTH WAYS (TYP.)
5,000 P.S.I. CONCRETE.
INSTALL 18 INCHES OF
CLASS 2 BASE
BENEATH THE CATCHBASIN. COMPACT TO
95 PERCENT OF
MAXIMUM DENSITYPER ASTM D-1557.
6"
NO. 5 REINF.BARS AT 12" O.C.
BACK OF CURBBEYOND CATCH BASIN.
1/2"Ø BARS AT 4" O.C.
CONSTRUCTION
JOINT.
BELOW.
EXPANSION JOINT.
7' - 0"
1' TYP.
P.C.C. STORMWATER CATCH BASIN J
NTS
NOTES:
DEPTH VARIES
PER PLANS
2"
D D
1'-0"
PIPE ZONE VARIES
1 1
VARIES
1. TRENCH DEPTH VARIES PER PLANS.
2. WHERE THE PERMIT OF A GOVERNING AGENCY
SETS FORTH REQUIREMENTS MORE STRINGENT
THAN THOSE STATED HEREIN, THE CONTRACTOR
SHALL ADHERE TO THE AGENCY REQUIREMENTS.
3. WHERE THE TRENCH DEPTH EXCEEDS 3', THE
PIPELINE CONTRACTOR SHALL UTILIZE ANY OF THEFOLLOWING METHODS FOR EXCAVATION AND TRENCH STABILIZATION. THE METHOD OF
EXCAVATION AND TRENCH STABILIZATION SHALLBE APPROVED BY CAL OSHA.
A) SHORING AS APPROVED BY THE ENGINEER.
B) SLOPING BOTH TRENCH SIDES AT A 1:1 MAXIMUM
ABOVE THE BOTTOM 3 FEET.
C) "STEPPING OR BENCHING" BOTH TRENCH SIDES
AT 3 FOOT VERTICAL INCREMENTS, THE WIDTH
OF EACH BENCH SHALL BE THE SAME AS THE
BOTTOM 3 FEET.
D) USE OF A STEEL SHIELD.
VARIES E) USE OF TRENCH JACKS.
BACKFILL TRENCH WITH NATIVE
MATERIAL COMPACTED INMAXIMUM 12 INCH LIFTS TO 90PERCENT OF MAXIMUM DENSITYPER ASTM D - 1557. SUBSEQUENT
LIFTS SHALL NOT BE INSTALLED
UNTIL PREVIOUS LIFTS HAVE BEEN
TESTED AND APPROVED.
INSTALL NEW STORMWATER PIPELINE.
DIAMETER AND TYPE OF PIPELINE PER PLANS.
INSTALL GRANULAR SAND MATERIAL WITH
SAND EQUIVALENT OF 35 OR GREATER.COMPACT THE SAND BACKFILL TO 95
PERCENT OF MAXIMUM DENSITY PER
ASTM D-1557. * IF PIPE COVER IS LESS
THAN 3 FEET, INSTALL 2 SACK CEMENT
SLURRY FROM THE SPRING LINE OFSTORM WATER PIPELINE. THE THICKNESSOF THE CEMENT SLURRYCIRCUMFERENCE AROUND THE PIPELINESHALL BE 12-INCH MIN. 7"
26"
INSTALL NEW A.C. PAVEMENT.
DEPTH PER PLANS.
STORM WATER PIPE TRENCH DETAIL I
NTS
TRENCH DETAIL (FOR FUTURE
SIGNALIZATION ELECTRICAL LINE) K
NTS
CONNECTOR PIPE.
LIP OF GUTTER, LEVEL.
3 1/2" X 3 1/2" X 1/2" ANGLE, FULL
LENGTH OF OPENING; TILT TOMATCH CURB. HOT DIP
GALVANIZE AFTER
FABRICATION.
CURB RAMP DETAILS
2018 CALTRANS STANDARD PLANS DETAIL A88A
NTS
L A.C. DIKE DETAIL M
23 2018 CALTRANS STANDARD PLANS DETAIL A87B NTS
23 23 23
23 STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
HOT MIX ASPHALT DIKES A87B
PIPE INSTALLATION INNATIVE MATERIALFINISH SURFACE AREA
PIPE INSTALLATION INNEW PAVEMENT AREA
INSTALL CLASS 2 BASE
MATERIAL. DEPTH PER PLANS.
BACKFILL TRENCH WITHNATIVE MATERIAL COMPACTED
IN MAXIMUM 12 INCH LIFTS TO
90 PERCENT OF MAXIMUM
DENSITY PER ASTM D - 1557.
SUBSEQUENT LIFTS SHALL
NOT BE INSTALLED UNTILPREVIOUS LIFTS HAVE BEEN
TESTED AND APPROVED.
3'-0"*
MINIMUM DEPTH
PIPE INVERTELEVATION PERPLANS.
D = 6" FOR PIPE DIA. < 12"D = 12" FOR PIPE DIA. > 12"
PIPE TRENCH IN NATIVE MATERIAL ORNEW PAVEMENT AREA.
INSTALL 3INCHES OF A.C.
PAVEMENT.
INSTALL 9 INCHES OF 3/4" MAX
MED. CLASS 2 BASE. COMPACT TO
95 PERCENT OF MAXIMUM DENSITY
PER ASTM D-1557.
9"
3'-0"
2'-0"
MIN.
MINIMUM DEPTH
PER PLAN
PIPE DIAMETER AND
MATERIAL PER PLANS.
REMOVE AND DISPOSE OF
EXISTING NATIVE MATERIAL
WITHIN THE PIPE TRENCH FOR
THE PIPELINE INSTALLATION.
PER PLAN I.D.
1"
OVEREXCAVATION BELOW PIPE LAYING GRADE
SHALL BE RECOMPACTED TO 90% MAXIMUM DENSITY.
THE RECOMPACTED MATERIAL SHALL BE INSPECTED
AND APPROVED PRIOR TO PIPE PLACEMENT.
INSTALL GRANULAR SAND FILL WITH
A SAND EQUIVALENT OF 30 OR
GREATER. COMPACT TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM
D-1557 IN MAXIMUM 1 FOOT LIFTS.
SUBSEQUENT LIFTS SHALL NOT BE
PLACED UNTIL PREVIOUS LIFTS HAVE
BEEN TESTED AND APPROVED.
2'-0" MIN.
3"
COLD PLANE 2-FOOT WIDE X 0.20-FOOT
DEEP AREA FOR THE FULL WIDTH OF THE
A.C. PAVEMENT. TACK COAT THE
SAWCUT A.C. PAVEMENT EDGE AND
COLD PLANED AREA WITH GRADE SS-1H
EMULSIFIED ASPHALT. OVERLAY HEADER
AREA TO MATCH NEW AND EXISTING A.C.
PAVEMENT SURFACES WITH NEW HOT
MIX ASPHALT. (BOTH SIDES)
2'-0" MIN.
SAWCUT THE A.C. PAVEMENT
FOR THE FULL DEPTH OF THE
A.C. PAVEMENT. (BOTH SIDES)
D D
D= 6" FOR PIPE DIA. < 12"
D= 12" FOR PIPE DIA. > 12"
0.20'
MIN.
VARIES
PIPE TRENCH IN EXISTING PAVEMENT AREA
VARIES PER PLAN 7" 26"
DETAIL NOTES:
23 DETAIL SHEET
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
R
E
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:06 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97
OVEREXCAVATION BELOW
PIPE LAYING GRADE SHALL
BE RECOMPACTED TO 90%MAXIMUM DENSITY. THE
RECOMPACTED MATERIAL
SHALL BE INSPECTED AND
APPROVED PRIOR TO PIPE
PLACEMENT.
4-9 6,7
6,7,21 4-9
4-9
18.c
Packet Pg. 682
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)
ELEVATION
15'
STANDARD HIGH PRESSURE SODIUM
LUMINAIRE, TYPICAL, COMPLETE WITHPHOTO-CELL AND LAMP OR AS DIRECTED.LED MAY BE PROPOSED IN NEWDEVELOPMENT FOR CITY APPROVAL.
ROUND GALVANIZED MONOTUBE
STEEL POLE (KW INDUSTRIES
RTSE35-8.0-11-G-115PL OR APPROVEDEQUAL)
NOTES:
1. 250 WATTS LUMINAIRE @ STREET INTERSECTIONS OR IN FRONT OF INTERSECTION & 100 WATTS @ OTHER LOCATIONS, OR SIMILAR LUMEN STRENGTH IF LED IS PROPOSED.
2. #4 TIES TO BE @ 12" MIN. SEPARATION FROM TOP TO BOTTOM. SIDEWALL REBAR TO BE 3" OR MORE FROM EXCAVATION WALLS AND BOTTOM.
3. 1'-6" @ AREAS W/PARKWAY OR NO SIDEWALK, 5'-6" ELSEWHERE.
4. THIS DETAIL IS SUBJECT TO APPROVAL BY APPROPRIATE UTILITY AGENCY.
5. FOUNDATION CONCRETE TO BE 3500 PSI MIN. STRENGTH AND POURED AGAINST UNDISTURBED OR COMPACTED SOIL.6. DRILL OR BORE INTO UNDISTURBED OR COMPACTED SOIL (95% OF MAX DRY DENSITY). SONOTUBES NOT ALLOWED.
7. IF LED LIGHT IS SELECTED, CORRELATED COLOR TEMPERATURE (CCT) OF LED LIGHT SHALL NOT EXCEED 3,000K. 1"
ALUMINIUM
BASE COVER-
(4) QUARTER
SECTIONS
(4) 1
4" -20 HEX.
SOCKET COPSCREWS
1 1/4"
1/4" SLOPE
4"
VENT HOLE
HANDHOLE WITH
REINFORCING FRAME
AND COVER WITH
4" X 6 1
2 " OPENING.
BASE DETAIL
12 3/8"
30' MIN.
12"
MAX.
24"
MIN.
7 3/4"
TRENCH
NATIVE
90% COMPACTION
1" DIA. MIN. CONDUIT
ENCASED IN 2" MIN. RED
CONC. SIZE AND NO OF
WIRES PER I.I.D. DWGS.
PLACE CONDUIT BEHIND
CURB UNDER SIDEWALKOR PARKWAY.
18"
MIN.
FOUNDATION
5 FT. COIL
6" SAND FILL
#4 TIES TOP
AND BOTTOM
4-#4 BARS
CONDUIT SIZE AS
REQUIRED (1" MIN.)
SEE TRENCH DETAIL.
1" X 11" X 11 1/2"
POLE BASE PLATE
#4 BARE SINGLE STRAND
CONDUIT WIRE (MECH.GRD.
TO POLE) EXTEND 18"
ABOVE FOUNDATION.
AND WASHERS.
6" 6" 6"
4"
MIN.
6'-6"
4" X 20" SQ. TOP
1'-0" MIN.
3'-0"
3" OR MORE
CONC. BASE 1"
ABOVE SIDEWALK
SEE
NOTE 3
CL
SLOPE
PER PLANS (S=0.1%)
REPLACE EXISTINGPAVEMENT PER PIPE
TRENCH DETAIL I ON
SHEET 25.
EXISTING
PAVEMENT
SECTION TO
REMAIN.
EXISTING 12" DIA.
SD PIPELINE TO
REMAIN.
EXISTING 18" DIA.
SD PIPELINE TO
REMAIN.
MODIFY EXISTING CONCRETE
SHELF PER DETAIL BELOW.
INSTALL NEW 18 "
DIA. SD PIPELINE.
SEE PIPECONNECTION DETAIL
BELOW.
EXISTING STORMDRAIN MANHOLE
TO REMAIN.
CORE EXISTING STORM
WATER MANHOLE WALL TO
INSTALL NEW PIPE. A NEW
ORIFICE TO INSTALL NEW
18-INCH DIA. PVC PIPE
SHALL BE CORED WITH AN
EQUIPMENT SPECIALLYDESIGNED TO CUT A
SMOOTH HOLE WITHOUTSPALLING OR DAMAGE TO
THE REINFORCING STEEL
OR STRUCTURE.
W. INV. 965.66
(E. INV. 965.56)
4'±
INSTALL A WATERSTOP
GASKET, PACK
ANNULAR SPACE W/
PLASTIC CEMENT ANDFILLER BLOCKS
6" FOR BELL END
11" FOR SPIGOT END
CONC STRUC WALL
EXISTING MANHOLE
WALL THICKNESS TO BE
VERIFIED PRIOR TO
CONNECTING NEW PIPE
CL PIPE
SLOPE PER PROFILE
OD
MIX AND APPLY SEAL TIGHT
W/PLASTIC CEMENT (TYP)
BELL OR SPIGOT END
PIPE CONNECTION DETAIL
NTS
SLOPE
SLOPE
SLOPE
CONCRETE SHELF MODIFICATION
GRIND EXISTING CONCRETE SHELF.CONSTRUCT NEW SHELF TOCREATE A SMOOTH FLOW CHANNEL FOR THE NEW 18" DIA. STORMDRAIN PIPELINE TO BE INSTALLED.
NTS
A
DROP INLET
MODEL NO. B WEIGHT
DI243636
DI243648
36"48"
42"54"
3028 LBS.3889 LBS.
* BOX ONLY
*
MODEL NO.
RS243612RS243606
900 LBS.450 LBS.
C WEIGHT
12"
6"
EXTENSION
24"x36"
BOX DESIGN LOAD:H-20 TRAFFIC
DI243660DI243672
60"72"
66"78"
5611 LBS.6472 LBS.
UP TO 6'-0" INSIDE DEPTH
18"x31" THINWALL KNOCKOUTS.SLEDGE OUT ASREQUIRED.(TYP. 2 PLACES) 4'-0"
3'-0"
36"
24"
AINSIDE
HEIGHTOF BOX
C
OPTIONAL
EXTENSION
HEIGHT
DROP INLET
OUTSIDE
HEIGHTOF BOX
FRAME AND GRATE
ASSEMBLY AVAILABLE
IN TRAFFIC OR
PEDESTRIAN MODELSLOOSE FRAMEPAVING NOTCH
3" (TRAFFIC)
1-1/2"
(PEDESTRIAN)
31" ROUND THIN
WALL KNOCKOUTS.
SLEDGE OUT AS
REQUIRED.
(TYP. 2 PLACES)
B
12"
20'
10'
INSTALL 12-INCHES OF SMALL ROCK SLOPE
PROTECTION AROUND THE NEW P.C.C. DROP
INLET BOX. USE SMALL ROCK SLOPE
PROTECTION (ROCK GRADATION FOR 7-INCH
THICK LAYER) PER SECTION 72-4 OF 2018
CALTRANS STANDARD SPECIFICATIONS.
INSTALL RSP FABRIC TYPE "8" UNDERNEATH
THE RSP PER SECTIONS 72 AND 96-1.02I OF
2018 CALTRANS STANDARD SPECIFICATIONS.
6'-0"
5'-0"
INSTALL 12-INCHES CLASS 2 BASE MATERIAL.
COMPACT THE CLASS 2 BASE TO 95 PERCENT
OF MAXIMUM DENSITY PER ASTM D-1557.
12"
ROW ROW
INSTALL P.C.C. STORMWATER VALLEY GUTTER.
THE P.C.C SHALL CONTAIN 7 SACKS OF
CEMENT PER CUBIC YARD AND ATTAIN ACOMPRESSIVE STRENGTH OF 5,000 PSI AFTER 28 DAYS CURING. SEE SECTION C-C.
CC
BB
D D
AA
FL SLOPE
PER PLAN
FL. EL. PER PLAN
INSTALL P.C.C. SIDEWALK
PER CITY STANDARD
WITHIN PARKWAY AREA.
12'
5.5'
PARKWAY
6'
SIDEWALK
5.5'
SIDEWALK
P.C.C. SIDEWALK
PER CITY
STANDARD.
INSTALL NEW TWO (2) MIN.
ALUMINUM DIAMOND PLATES
PER SECTION A-A AND
SECTION B-B.
FL S=0.35%
10'
GRADE
BREAK
20'
EARTH-LINED
SWALE
℄ ℄
GRADE EXISTING NATIVE
MATERIAL SURFACE TO
FINISH DESIGN GRADE ASILLUSTRATED ON THEIMPROVEMENT PLANS.
TOP OF SLOPE
TOE OF SLOPE
TOE OF
SLOPE
TOP OF SLOPE
11' 9'
20'
SLOPE
3H:1V MAX
SLOPE
3H:1V MAX
SLOPE
3H:1V MAX
40' EASEMENT
REMOVE AND DISPOSE OF EXISTING NATIVEMATERIAL TO SUBBASE DESIGN GRADE.
INSTALL RSP FABRIC, PRIOR TO THE
PLACEMENT OF THE ROCK SLOPEPROTECTION. INSTALL RSP FOR A DEPTH OF 18 INCHES AT THE BASE OF THE NEW
STORMWATER VALLEY GUTTER. THE FINISHGRADE OF THE RSP SHALL BE ESTABLISHED AT THE BOTTOM OF THE SWALE. SEE SECTION
D-D.
SLOPE
3H:1V MAX
0.10' SLOPE
8"
SLOPE
2'-0" 2'-0"
4'-0"
10"
FLOWLINE
GRADE EXISTING
NATIVE MATERIAL
SURFACE TO FINISH
DESIGN GRADE AS
ILLUSTRATED ON THEIMPROVEMENT PLANS.
NOT TO SCALE
INSTALL 10 INCHES OF CLASS 2
BASE. THE BASE MATERIAL SHALLBE COMPACTED TO 95 PERCENT OFMAXIMUM DENSITY PER ASTMD-1557. 6"
MIN
6"
6"
MIN
6"
GRADE EXISTING NATIVE
MATERIAL SURFACE TO
FINISH DESIGN GRADE AS
ILLUSTRATED ON THEIMPROVEMENT PLANS.
INSTALL P.C.C. STORMWATER
VALLEY GUTTER. THE P.C.C SHALL
CONTAIN 7 SACKS OF CEMENT PERCUBIC YARD AND ATTAIN ACOMPRESSIVE STRENGTH OF 5,000 PSI AFTER 28 DAYS CURING.
SECTION C-C
1"
4 1"
DETAIL
SECTION B-B
3" STUD ANCHOR AT 14" O.C.
1/2" CHECKERED PLATE
6"
2 6"
6" 4' 6"
2 FL EL. PER PLANS
NOT TO SCALE
6 1'-6"
MIN.
12"
VARIES PER PLAN
INSTALL 20' X 11' X 1.5' DEEP MIN. SMALL ROCK
SLOPE PROTECTION (ROCK GRADATION FOR
7-INCH THICK LAYER) PER SECTION 72-4 OF
2018 CALTRANS STANDARD SPECIFICATIONS.
INSTALL RSP FABRIC TYPE "8"
UNDERNEATH AND ALONG ALL
SIDE OF THE RSP PER SECTIONS72 AND 96-1.02I OF 2018 CALTRANSSTANDARD SPECIFICATIONS.
GRADE, SCARIFY, MOISTURE
-CONDITION AND COMPACT
NATIVE MATERIAL FOR A DEPTH
OF 12-INCH BENEATH FINISH
GRADE PRIOR TO INSTALLING
RSP FABRIC
VARIES PER PLAN X
X:Y SLOPE
PER PLANS
SIEVE SIZE PERCENT PASSING
5 INCH 100
4 INCH 90-100
3 INCH 25-40
2 INCH 0-10
SMALL ROCK PROTECTION GRADATION
INSTALL RSP FABRIC
TYPE "8" UNDERNEATH
AND ALONG ALL SIDE
OF THE RSP PER
SECTIONS 72 AND96-1.02I OF 2018
CALTRANS STANDARD
SPECIFICATIONS.
1.5%
SECTION A-A
1/4" CHECKERED PLATE
BEND END OFPLATE TO MATCH
CURB FACE
SLOPE TO SWALE
NOT TO SCALE
SLOPE VARIES PER PLAN
NOTE
1 UNDER SIDEWALK DRAIN NOT PERPENDICULAR TO
CURB REQUIRES THE APPROVAL OF THE CITY
ENGINEER.
2 SLOPE TO DRAIN TO CENTER.
3 ALL EXPOSED METAL PARTS TO BE GALVANIZED.
SCREWS TO BE STAINLESS STEEL GRADE 316.
4 1 1/2" X 1 1/2" X 1/4" "L" FRAME WITH
3/8" X 1/4" STEEL STRIP WELDED TO FRAME.
5 CHECKERED PLATE SHALL BE ALUMINUM DIAMOND
PLATES DIMENSIONS PER PLANS.
6 FASTEN WITH 1/4" COARSE-THREAD COUNTERSINK.
SCREWS SHALL BE STAINLESS STEEL GRADE 316.
DETAIL SHEET
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:07 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 24 STREET LIGHT MODIFIED CITY OF EL CENTRO STANDARD DETAIL EC-900 NTS P
4-8
EXISTING STORM WATER MANHOLE
MODIFICATION DETAIL
NTS
O
4-8
Exp. 12-31-22
No. 31773
AJ M G.
ES
OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E I REEN GN
SI L NA O
L
LI
I
F NRO IA *
RE GE TSI E P D E ROF RSN DRAWN BY:
DATE DESIGN BY:
S *
E TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:07 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 DROP INLET DETAIL NTS Q
4,9
NTS
N
4-8
UNDER SIDEWALK DRAIN CAST IN PLACE
CITY OF EL CENTRO MODIFIED STANDARD DETAIL EC-309.
PLAN VIEW
NOT TO SCALE
18.c
Packet Pg. 683
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 9 CURB &
18''x18''
DEPTHGUTTER
2' MIN.
3 2
11 1 12' MIN.
MAIN
(TYP.) RADIUS
VARIES
WATER
1" ROUND ROCK
INSTALL 18-INCH x 18-INCH
SQUARE, 3 FOOT DEEP, 1 INCH
ROUND ROCK MATERIAL
BENEATH STANDARD AIR AND
VACUUM RELEASE VALVE
ASSEMBLY.
STREET
GUTTERCURB &
WATERPIPELINE
R/W LINE
12"
12"
PAVEMENT
5 6
10 7
8 4
3" SLOPE 2%
BACK OF P.C.C. SIDEWALK
3' (MIN.) 17 3/4"
SECTION
PLAN
6 10
5 7
8 9
4 P.C.C. SIDEWALK
12"
12"
3 2
1 0.50 FEET
4.5'
4.5'
0.5'
CL
CL
CL
12"
24"
BASE ASSEMBLY DETAIL
CONCRETE
BASE SHALLBE CAST IN
PLACE.
3"
L
6"
8 11/16"
C. TO C.
17 3/8"
C
15 LC
1' 1'
12"
C
CAST HOLE 8 11/16" R.
24" L
REINFORCE WITH
A SINGLE LAYER
OF 20 INCH X 20
INCH 6" X 6" - 10
GAUGE WELDED
WIRE FABRIC.
4" DIA.
PLAN
SECTION
3/8"X4" LONG
GALVANIZED EXPANSION
BOLTS SET 3" DEEP IN
CONCRETE (TYP. 4
PLACES). COORDINATE
WITH COVER ASSEMBLY
DETAIL AS ILLUSTRATED
ON THE NEXT PAGE.COVER ASSEMBLY TO BECENTERED ON BASE
ASSEMBLY SLAB.
NOTES:
EXISTING BRONZE JAMES JONES CORPORATION STOP TO REMAIN.EXISTING BRONZE CAST BODY, DOUBLE STAINLESS STEEL STRAPS
WITH WELDED BOLT, PASSIVATED STAINLESS STEEL NUT, BNNA-N O'RING TO REMAIN.
INSTALL NEW WATER PIPE= ANACONDA TYPE "K" COPPER.
(SIZE 1" OR 2" DIA. TO BE VERIFIED AT FIELD)
INSTALL NEW BASE ASSEMBLY. SEE SUPPORT SLAB DETAIL.
EXISTING GATE VALVE 1"= MILWAUKEE NO. 105 TO REMAIN.EXISTING BRASS NIPPLE SIZE X CLOSE TO REMAIN.EXISTING AIR VACUUM RELEASE VALVE ASSEMBLY TO REMAIN.EXISTING OVERFLOW ASSEMBLY TO REMAIN.USE PREVIOUSLY REMOVED COVER ASSEMBLY.EXISTING JAMES JONES J-2605SG OR MUELLER H15428 MIP X COMPRESSION FITTING TO REMAIN.
NOT USED.
ALL CONCRETE SHALL CONTAIN 7 SACKS OF CEMENT PER CUBICYARD AND ATTAIN 5,000 PSI COMPRESSIVE STRENGTH AFTER 28 DAYS CURING.
ALL MANUFACTURED ITEMS INDICATED SHALL BE AS NOTED OR ANAPPROVED EQUAL AUTHORIZED BY THE CITY OF CENTRO ENGINEER IN WRITING.
ALL FITTINGS SHALL BE SWEAT FITTINGS EXCEPT AS NOTED. ALL SOLDERED JOINTS TO BE POLISHED WITH NO. 00 STEEL WOOL OR
FINE GRADE SANDCLOTH TO OBTAIN A BRIGHT AND CLEAN
SURFACE.
1 2
3 4
56789
121314
10 11
3/8" GALVANIZED
ANCHOR BOLTS
90.0°'
PLAN VIEW "B"
PLAN VIEW "A"
DEAD END MANHOLE
SHELF
SHELF
FLOW
CHANNEL
2'
A A FLOW
FLOW
CHANNEL SHELF
SHELF 4'-0" DIA. SHELF
24"
TYP.
1'-0"
MANHOLE BASE1/4"/FT.
2'-0"
4'-0"
ECCENTRIC CONE BASE SHAFT
TYP.
SECTION A-A
INSTALL SDR 35 PVC,
SDR 26 PVC OR
CORRUGATED HDPE
END CAP FITTING AT
THE TERMINATION
POINT OF THEPIPELINE FORPIPELINE STUBOUTS.
PLACE CLASS 2BASE TO THE
APPROPRIATE
GRADE. COMPACT
THE CLASS 2 BASETO 95 PERCENT OF
MAXIMUM DENSITYPER ASTM D-1557.
M.H. FRAME AND COVER SHALL BE
ALHAMBRA FOUNDRY A-1325 OR ANAPPROVED EQUAL MARKED "SD" OR "STORM DRAIN"
1'-0"
TYP.
INSTALL A 1'-0" WIDE, 1'-0" DEEP
CONCRETE RING CIRCUMFERENTIALLY
AROUND THE MANHOLE FRAME. PLACE
THE CONC. RING FLUSH WITH
PAVEMENT
PRECAST CONCRETE
CONES AND SHAFTS.
PER ASTM C478.
PLACE GRADE RINGS ASREQUIRED TO ADJUST THE
MANHOLE COVER TO GRADE.
PRECAST CONCRETE.
JOINTS INSIDE AND
OUTSIDE (TYPICAL).
18"
MAX.
GROUT ANNULARSPACE CREATED FORSEWER PIPELINE.
STORMWATER
MAIN.
1/4"/FT.
CEMENT
GROUT
1-1/2"
1" MORE THAN
RADIUS OF PIPE.
STORMWATER
MAIN.
STORMWATER
PIPELINE.
CONSTRUCT
NEW CONCRETEMANHOLE BASE
OVER THESTORMWATER
PIPELINE.
STORMWATER
PIPELINE.
EXTEND PIPE FROMMANHOLE SHAFT FOR
FUTURE CONNECTION.
1/4"/FT.
1/4"/FT.
STORMWATER
PIPELINE.
INSTALL SDR 35 PVC, SDR 26 PVC OR
CORRUGATED HDPE END CAP FITTING
AT THE TERMINATION POINT OF THE
PIPELINE FOR PIPELINE STUBOUTS.
PIPELINE DIAMETERPER PLAN.
3'-0" OR 2'-0"
45", 36", 30", 24",
15" OR 12"
VARIABLE NUMBER OF SECTIONS AS REQUIRED
4"
ADJ.
RING
5"
0.05' MIN DROP
BETWEEN PIPES
9"
VARIES
6'-10" DIA.
NATIVEMATERIAL
OUTLET PIPE
INLET PIPE
INSTALL STEPS PER DETAIL
GG AND HH ON SHEET 34.
12" MIN
12" MIN.
TYP.
5" 3" 3"
6" BOTTOM OF
A.C. DIKE
A.C.
PAVEMENT
2" 6"
P.C.C. CURB
AND GUTTER
12 1/2"
3"
MATCHPOINT
PROFILE VIEW
BOTTOM OF
A.C. DIKE
BOTTOM OF
A.C. DIKE
A.C.
PAVEMENT
BOTTOM OF A.C.DIKE TRANSITION
BOTTOM OF A.C.DIKE TRANSITION
GUTTER
EDGE
BOTTOM OFP.C.C. CURB
FACE OFP.C.C. CURB
BACK OFP.C.C. CURB
PLAN VIEW
TOP OF
A.C. DIKE
3" 3" 5" TOP OF A.C. DIKE TRANSITION
A.C.
PAVEMENT
A.C.
PAVEMENT
6" 18" 2"
FACE OF P.C.C. CURB
5' OR AS ILLUSTRATED ON PLANS
DETAIL SHEET
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
R
E
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:08 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 25
AIR VACCUM RELEASE VALVE DETAILNTS
R
4 25
Exp. 12-31-22
No. 31773
AJ M
G. ES OLT H
SHEET
135.042E
JOB NO.
OF SHEETS 34
E
I
R
E
E
N
GN
SI
L NA O
L
LI
I
F
NRO IA
*
RE
G
E
TS
I
E
P D E ROF RSN
DRAWN BY:
DATE DESIGN BY:
S
*
E
TAT
C OF
CHECKED BY: CI
JGH
R
A
V
S
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
ENGINEERING PLANNING SURVEYING
The Holt Group, Inc.
EL CENTRO OFFICE
1601 N. Imperial Ave.
El Centro, CA 92243
(760) 337-3883
BLYTHE OFFICE
201 E. Hobsonway
Blythe, CA 92225
(760) 922-4658
JAMES G. "JACK" HOLT R.C.E. NO.
DATE REG. EXP.
12/31/22
PREPARED UNDER THE DIRECT SUPERVISION OF:
31773
06/10/2022
CITY OF EL CENTRO
RSN/CAG
C:\Users\cgarcia\The Holt Group\135.042 - 135.042\CAD\PHASE II\135.042_SHEET 22-25_DETAILS.dwg 06/10/2022 09:08 "C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL CONTROL POINT THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONG STATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD). PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03 FEET + 1000 FEET = 985.97 48-INCH DIAMETER STORM DRAIN MANHOLE
NTS
S
4 25
CURB AND GUTTER TO A.C. DIKE TRANSITION
NTS
T
4 25
BLOWOFF ASSEMBLY
NTS
V
4 25
48 - INCH S.S. MANHOLE
NTS
U
4 25
CITY OF EL CENTROSTD. DWG NO. EC-610
18.c
Packet Pg. 684
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 0+00 1+00
P
SS SS
MH
WM
WM
SS
SS
SS SS
26+00
27+00
28+00
29+00
W
SOUTHIMPERIALAVE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF:
03/31/22
CITYOFELCENTRO
SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
ELECTRICALPLANINTERSECTION
SOUTHIMPERIALAVENUE&WAKEAVENUE
ELECTRICALPLAN(INTERSECTIONSOUTHIMPERIALAVENUE&WAKEAVENUE) SCALE1"=20'-0"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
SCALE:1"=20'
E1/26
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
&
&
&*
)
+""
+
&*
))
"&)!"")
%,""
*$#
&
&
&*
)
+
"
+
&*
),)!""&)!"")
%,""
*$#
&)
&
(
)
(
)
%
&
&
&
)
)
)
(
#
)
(
)
(
(
!$
,
"
18.c
Packet Pg. 685
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SS
SS
1+00 2+00 3+00 4+00 5+00 6+00
WAKEAVENUE
WAKEAVENUE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
FUTUREWAKEAVENUESTREETLIGHTING
FROMSTATION1+00ETOSTATION6+50E
E2/27
STREETLIGHTINGPLAN(STATION1+00ETO6+50E)
SCALE1"=20'-0"
SCALE:1"=20'
03/31/22
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
& &
&*
)
+""
+
&*
))
"&)!""
)
%,""
*$#
& &
&*
)
+
"
+
&*
),)!""&)!""
)
%,""
*$#
&)
& (
)
(
)
%
&
&
& ) )
)
(
#
)
(
)
(
(
!$
,
"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 686
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SS
SS 7+00 8+00 9+00 10+00 11+00 12+00 12+13
WAKEAVENUE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
FUTUREWAKEAVENUESTREETLIGHTING
FROMSTATION6+50ETOENDOFPROJECT
E3/28
STREETLIGHTINGPLAN(STATION6+50ETO12+50E)
SCALE1"=20'-0"
SCALE:1"=20'
03/31/22
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
& &
&*
)
+""
+
&*
))
"&)!""
)
%,""
*$#
& &
&*
)
+
"
+
&*
),)!""&)!""
)
%,""
*$#
&)
& (
)
(
)
%
&
&
& ) )
)
(
#
)
(
)
(
(
!$
,
"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 687
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 29+00
30+00
31+00
32+00
33+00
SOUTHIMPERIALAVE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
SOUTHIMPERIALAVENUESTREETLIGHTING
FROMSTATION29+00STOSTATION33+50S
STREETLIGHTINGPLAN(STATION29+00STO33+50S)
SCALE1"=20'-0"
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
&
&
&*
)
+""
+
&*
))
"&)!"")
%,""
*$#
&
&
&*
)
+
"
+
&*
),)!""&)!"")
%,""
*$#
&)
&
(
)
(
)
%
&
&
&
)
)
)
(
#
)
(
)
(
(
SCALE:1"=20'
E4/29
!$
,
"
03/31/22
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 688
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SS
34+00
35+00
36+00
37+00
38+00
SOUTHIMPERIALAVE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
SOUTHIMPERIALAVENUESTREETLIGHTING
FROMSTATION33+50STOSTATION38+00S
E5/30
STREETLIGHTINGPLAN(STATION33+50STO38+00S)
SCALE1"=20'-0"
SCALE:1"=20'
03/31/22
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
& &
&*
)
+""
+
&*
))
"&)!""
)
%,""
*$#
& &
&*
)
+
"
+
&*
),)!""&)!""
)
%,""
*$#
&)
& (
)
(
)
%
&
&
& ) )
)
(
#
)
(
)
(
(
!$
,
"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 689
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SS
0+00 1+00 (18"W) (18"W)
38+00
39+00 40+00
41+00
SOUTHIMPERIALAVE
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
SOUTHIMPERIALAVENUESTREETLIGHTING
FROMSTATION38+00STOSTATION41+01.67S
E6/31
STREETLIGHTINGPLAN(STATION38+00STO41+01.67S)
SCALE1"=20'-0"
SCALE:1"=20'
03/31/22
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
& &
&*
)
+""
+
&*
))
"&)!""
)
%,""
*$#
& &
&*
)
+
"
+
&*
),)!""&)!""
)
%,""
*$#
&)
& (
)
(
)
%
&
&
& ) )
)
(
#
)
(
)
(
(
!$
,
"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 690
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) 1+00 2+00 3+00 4+00 5+00 6+00 7+00
(8"W) (8"W)
DANENBERGDR DANENBERGDR
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF: CITYOFELCENTRO SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
DANENBERGDRIVESTREETLIGHTING
FROMSTATION0+00ETOSTATION7+00E
E7/32
STREETLIGHTINGPLAN(STATION0+00ETO7+00E)
SCALE1"=20'-0"
SCALE:1"=20'
03/31/22
NOTES:
!"#
$%
"$
&
'
&
(
!
(
)
)
&
)*$
$
'
&
%
%
LEGEND:
!
"
#
#
!
$
#
#
!$
#
#
!
"
%
&
'
"
#
( #
%
#
&
&
KEYNOTES:
& &
&*
)
+""
+
&*
))
"&)!""
)
%,""
*$#
& &
&*
)
+
"
+
&*
),)!""&)!""
)
%,""
*$#
&)
& (
)
(
)
%
&
&
& ) )
)
(
#
)
(
)
(
(
!$
,
"
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
18.c
Packet Pg. 691
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) ELECTRICALGENERALNOTES:
!
"
!
#
#
$
"
#
$! !
!!%&
'
"
$#
&
(
)
'
&!
*
"
+
"
$
!
,
-!*
!*
'
'
!*
,
-#
#
!!
&*&
+
+
+
!
,
-
!
$!.
!!
!!!
"
,
%
%
%!!
$ -
$#
+
+
,
(-
,
-
,-
$#/!0
(0
&!
&
!
!
!
!!
$#
+
,$-&
*#/*#
#
!
#
,
$
-
&
!
!
SHEET
135.042E
JOBNO.
OFSHEETS 34
JRA
DRAWNBY:
DATE DESIGNBY:
CHECKEDBY:
JRA
NO. APPROVED
mustbeinwritingandmustbeapprovedbytheprepareroftheseplans.for,orliablefor,unauthorizedchangestoorusesoftheseplans.AllchangestotheplansUNAUTHORIZEDCHANGES&USES:Theengineerpreparingtheseplanswillnotberesponsible REVISIONS:
PROJECTBENCHMARK:
ENGINEERINGPLANNINGSURVEYING
TheHoltGroup,Inc.
ELCENTROOFFICE
1601N.ImperialAve.
ElCentro,CA92243
(760)337-3883
BLYTHEOFFICE
201E.Hobsonway
Blythe,CA92225
(760)922-4658
R.C.E.NO.
DATE REG.EXP.
PREPAREDUNDERTHEDIRECTSUPERVISIONOF:
03/31/22
CITYOFELCENTRO
SOUTHIMPERIALAVENUEROADWAYEXTENSION
FROMWAKEAVENUETODANENBERGDRIVE-
PHASEII
STAFF
"C-161981"HORIZONTALCONTROLPOINT#2ANDVERTICAL
CONTROLPOINT
THESTATIONISLOCATED3.05MI(4.91KM)EASTALONGTHE HOLTON-URBANRAILWAYFROMTHESOUTHERNPACIFICRAILROAD STATIONINELCENTRO,THENCE3.75MI(6.03KM)SOUTHALONGSTATEHIGHWAY111,INTOPANDONTHESOUTHWESTCORNEROF DELIVERY31HEADWALLINALDERLATERAL5,65.0FT(19.8M)EAST OFTHEEASTRIGHT-OF-WAYFENCEOFHIGHWAY111,AND39.5FT (12.0M)EASTOFTHEEASTFRONTAGEROAD(YOURMANROAD).
PRIMARYVERTICALCONTROL-NAVD88ORTHOHEIGHT=-14.03 FEET+1000FEET=985.97
JAMESR.ADLER
12/31/2023
E16119
STREETLIGHTINGNOTES&DETAILS
JOLENTERPRISES,INC.
720E.39thPlace,Suite6
YumaArizona,85365
office:(928)783-0922
fax:(928)783-3854
www.jolenterprises.com
E8/33
STREETLIGHTASSEMBLY/POLEDETAIL
!
"
"
#
$
"
%
&
'
!
"
"
#
"
(%
&
ELECTRICALONE-LINEDIAGRAM
)$
*
$!
(+
+
++
NOTES(ONE-LINEDIAGRAM):
+
%
*
"
"
+
+
*
"
*
,-
"
%
"++.+
+
*
#&+(
.
+
$+
%
-
+
STREETLIGHTJUNCTIONBOXDETAIL
*
#"
&
",
*
/
(
+,
(
!
!
#
$&
#++
&
%
"
%
%
18.c
Packet Pg. 692
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II) SS SS
SHEET
135.042E
JOB NO.
OF SHEETS 34
HQL
DRAWN BY:
DATE DESIGN BY:
CHECKED BY:
KCY
NO. APPROVED
must be in writing and must be approved by the preparer of these plans.for, or liable for, unauthorized changes to or uses of these plans. All changes to the plansUNAUTHORIZED CHANGES & USES: The engineer preparing these plans will not be responsible REVISIONS: PROJECT BENCH MARK:
KALYAN C. YELLAPU R.C.E. NO.
DATE REG. EXP.
12/31/23
PREPARED UNDER THE DIRECT SUPERVISION OF:
75023
CITY OF EL CENTRO
DVS
"C-16 1981" HORIZONTAL CONTROL POINT #2 AND VERTICAL
CONTROL POINT
THE STATION IS LOCATED 3.05 MI (4.91 KM) EAST ALONG THE
HOLTON-URBAN RAILWAY FROM THE SOUTHERN PACIFIC RAILROAD STATION IN EL CENTRO, THENCE 3.75 MI (6.03 KM) SOUTH ALONGSTATE HIGHWAY 111, IN TOP AND ON THE SOUTHWEST CORNER OF DELIVERY 31 HEADWALL IN ALDER LATERAL 5, 65.0 FT (19.8 M) EAST OF THE EAST RIGHT-OF-WAY FENCE OF HIGHWAY 111, AND 39.5 FT (12.0 M) EAST OF THE EAST FRONTAGE ROAD (YOURMAN ROAD).
PRIMARY VERTICAL CONTROL - NAVD 88 ORTHO HEIGHT= -14.03FEET + 1000 FEET = 985.97 34 18.c
Packet Pg. 693
Attachment: 11X17 Phase II Bid Set Plans (5475 : Approval of Plans and Specs - Imperial Avenue Extension Phase II)