Cities Index.
City · Energy

Fowler

Energy contracts the Fowler City Council took up since 2022. All Fowler meetings.

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
4actions
4vendors
$256,548approved (recorded vote)
$70,409proposed, no vote in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateVendorItemActionAmountSize · price · savingsOutcomeSources
2025-08-05Lithia Ford Lincoln of FresnoAPPROVE the purchase of a 2025 Ford F150 Lighting Pro EV Truck from Lithia Ford Lincoln of Fresno in the amount of $58,409.01 and authorize the City Manager to
Fleet vehicles
Purchase order$58,4091 new 2025 Ford F-150 Lightning Pro electric truck
$53,475.00 (subtotal before tax and fees)
No vote recordedpacket · city original
2022-09-20ARC AlternativesSolar Project Consultant Service Agreement with ARC Alternatives for Fire Station Solar Project
Solar and solar PPAs
Award$12,000
not to exceed
67.2-kilowatt photovoltaic systemNo vote recordedpacket · city original
2022-06-21Pacific SolarAPPROVE a contract with Pacific Solar Inc., in the amount of $155,020.52 for the Fire Station Solar Project and authorize the City Manager or her designee to ex check
Solar and solar PPAs
Award$155,02167.20 kWdc
$2.31 per watt
roughly $770,000 in total bill savings over 20 years
Approved
Ayes: Parra, Mejia, Kazarian, Rodriquez
minutes · minutes · packet · packet · packet
2022-06-07Advanced Lighting ServicesAPPROVE a contract with Advanced Lighting Services Inc., in the amount of $101,527.23 for the Lighting (LED) Project Phase 1 and authorize the City Manager or h
Efficiency retrofits and ESPCs
Award$101,527Estimated annual energy savings $15,865.81; payback 6.90 yearsApproved
Ayes: Kazarian, Mejia, Parra.
minutes · packet · packet · city original