Vendor · Energy
Integrated Project Solutions
Contract actions with Integrated Project Solutions in California city council documents since 2022 — also written as Integrated Project Solutions, of Walnut Creek, California.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
2actions
2cities
$0.00approved (recorded vote)
$542,032proposed, no vote in the index
2024-04-02first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-01-13 | Lindsay | Award of Architecture-Engineering Services Contract to Integrated Project Solutions for the Lindsay Generators Project Microgrids and backup power | Award | $149,750 not to exceed | standby generators at seven City facilities | No vote recorded | packet · city original |
| 2024-04-02 | Santa Rosa | Professional Services Agreement Approval – Engineering Design Services for the Delta Pond Standby Generator and LTP Annex Boiler Replacements Microgrids and backup power | Award | $392,282 not to exceed | No vote recorded | staff report · city original |