FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 45 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Air Quality c) Continued… MM AQ-02: (Compliance with SJVAPCD) Verify SJAPCD’s Control Measures. The contractor, City Engineer, and Inspectors shall verify that the SJVAPCD’s control measure is implemented as outlined below or equivalent to reduce fugitive dust emissions throughout all phases of construction. These measures shall be incorporated in bid documents prior to City approval. The implementation of these measures shall be verified on an ongoing basis through construction inspections: 1. Require construction equipment used at the site to be equipped with catalysts/particulate traps to reduce particulate and NOx emissions. These catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). At the time bids are made, contractors shall show that the construction equipment used is equipped with particulate filters and/or catalysts or prove why it is infeasible. 2. Use alternative fuels and construction equipment. 3. Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set). 4. Install windbreaks on windward sides of construction areas. 5. Curtail construction during periods of high ambient pollutant concentrations. This may include ceasing construction activity during peak-hour vehicular traffic on adjacent roadways, and “Spare the Air Days” declared by the District. Throughout all phases of Project construction. Project contractor, City Engineer, and Inspectors Date: ________ Initials: _______ SC AQ-01: Regular Cleaning of Track-out Areas. Before Project approval, the City Engineer shall confirm that the plans and specifications for the Project include a note requiring regular cleaning of track-out areas throughout each workday and at the end of each workday to clean dirt deposited on any public highway or street (SJVAPCD Rule 8041: Carryout and Trackout). Prior to Project approval City of Escalon Engineering Department Date: ________ Initials: _______ d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? See Mitigation Measures MM AQ-01: Fugitive Dust Control. Throughout Project construction. City of Escalon; Project contractor(s) Date: ________ Initials: _______

Page 380 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 46 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Air Quality d) Continued… See Mitigation Measures MM AQ-02: (Compliance with SJVAPCD) Verify SJVAPCD’s Control Measures. Throughout all phases of Project construction. Project contractor, City Engineer, and Inspectors Date: ________ Initials: _______ Biological
Resources a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? MM BIO-01: Pre-construction Nesting Bird Clearance Surveys. If construction occurs between February 1st and August 31st, a p Pre- construction clearance surveys for nesting and protected birds and raptors should be conducted by a qualified biologist, pursuant to CDFW protocol and as delineated below within fifteen (15) days and three (3) days in advance of the start of any vegetation removal or ground disturbing activities and mobilization for the Project. Pre-construction surveys are intended to identify active nests and other evidence of protected species so that construction can completely avoid species that are protected under the MBTA and Fish, Game Code and that applicable agency protocol can be implemented so ensure that no nesting migratory birds, protected birds or raptors will be disturbed during construction. Survey Report: The biologist conducting the clearance surveys should document a negative survey with a brief letter report for each survey indicating that no impacts to active avian nests or protected species will occur or stating whether protocol surveys are warranted. If an active avian nest is discovered during the pre-construction clearance survey, construction activities should stay outside of a No Disturbance Buffer: A no-disturbance buffer or alternative method approved by CDFW that will be established by the City’s biologist to protect any species and active nests. The size of the no-disturbance buffer will be determined by the wildlife biologist and will depend on the level of noise and/or surrounding anthropogenic disturbances, line of sight between the nest and the construction activity, type and duration of construction activity, ambient noise, species habituation, and topographical barriers. These factors will be evaluated on a case-by-case basis when developing buffers and distances. Limits of construction to avoid an active nest or species take will be established in the field with flagging, fencing, or other appropriate barriers; and construction personnel will be instructed on the sensitivity of nest areas and species If construction occurs between February 1st and August 31st Prior to start of construction or mobilization City of Escalon, Project biologist, contractor
Date: ________ Initials: _______

Page 381 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 47 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Biological
Resources a) Continued…
a) Continued…
locations so that disturbance, take, possession, and destruction of any protected birds or raptors is completely avoided.

Biological Monitor: A biological monitor should be present to delineate the boundaries of the buffer areas and to monitor the active nest, protection in place, or relocations to ensure that protected species and nesting behavior is not adversely affected by the construction activity. Once the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions or if the biologist deems that there is no potential for impacts on protected species, construction activities within the buffer area can occur.

Swainson’s Hawk: A qualified biologist shall conduct a SWHA survey within a minimum 1/2-mile radius around the project. Surveys should be conducted according to the following the five-period schedule in accordance with the “Recommended Timing and Methodology for Swainson's Hawk Nesting Surveys in California's Central Valley (Swainson's Hawk Tech. Advis. Comm., 5/2000)”:
• January to March 20- One (1) Survey, All Day • March 20 to April 5- Three (3) Surveys, Sunrise to 1000 / 1600 to Sunset
• April 5 to April 20- Three (3) Surveys, Sunrise to 1200 / 1630 to Sunset
• April 21 to June 10- Monitoring • June 10 to July 30- Three (3) Surveys, Sunrise to 1200 / 1600 to Sunset
If an occupied nest is found and may be impacted by project activities, the project proponent should consult with CDFW and demonstrate compliance with CESA. CDFW is responsible for ensuring appropriate conservation of fish and wildlife resources including threatened, endangered, and/or candidate plant and animal species, pursuant to CESA. CDFW recommends that a CESA Incidental Take Permit (ITP) be obtained if the project has the potential to result in “take” (Fish & G. Code

Page 382 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 48 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Biological
Resources § 86 defines “take” as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill”) of CESA-listed species, either through construction or over the life of the project. Modified MM BIO-02: Ground Nesting Raptors Pre-construction Survey- Prior to Project construction, the City of Escalon shall retain a qualified biologist to conduct a survey for ground and other nesting raptors (in March or April) 30 fifteen (15) days and repeated 3 days prior to construction activities (i.e., grading) in areas containing suitable nesting habitat. Active raptor nests located within 500 feet of construction activity shall be mapped. Prior to Project construction. City of Escalon, Project biologist Date: ________ Initials: _______ Modified MM BIO-03: Raptor Nests- If active raptor nests are located on or within 500 feet of a construction site, a minimum of a 500 feet buffer area shall be established by a qualified biologist and construction activities shall be prohibited within this buffer zone until the end of the nesting season (April through August) or until the young have fledged. A qualified wildlife biologist shall monitor the nest to determine when the young have fledged and submit weekly reports to CDFW throughout the nesting season. If active raptor nests are located on or within 500 feet of a construction site. City of Escalon, Project contractor(s), Project biologist Date: ________ Initials: _______ Modified MM BIO-04: Active Nests- Prior to construction activities, the City of Escalon in coordination with the Project contractor and qualified biologist shall identify trees with active nests. Active nests shall only be removed prior to the onset of the nesting season (March) or after the young have fledged (late August). Prior to construction activities. City of Escalon, Project contractor(s), Project biologist Date: ________ Initials: _______ b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Modified MM BIO-05: Jack and Bore Construction- At jack and bore locations, bore pits shall be excavated at least 50 feet outside the edge of riparian vegetation to avoid impacts. A biological monitor shall be present during staking for jack and bore and during jack and bore construction to alert the construction crew to the possible presence of any special-status amphibian or reptile at risk during the crossing. The following measures shall be implemented: - Construction at stream crossings with riparian and/or emergent vegetation shall be limited to facilitate detection and reduce the potential of direct mortality for snakes. The USFWS Sacramento Field Prior to and throughout jack and bore construction. City of Escalon, Project contractor(s), Project biologist Date: ________ Initials: _______

Page 383 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 49 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Biological
Resources b) Continued…
office shall be contacted in the event that construction needs to occur between October 2 and April 30 to determine if additional measures are necessary to minimize and avoid take. - Two weeks prior to any ground-disturbing activity at stream crossings with riparian and/or emergent vegetation, the bore pit, staging area, and access routes shall be fenced with snake-proof fencing that will be installed under supervision of the city’s biologist. Two days prior to construction, a biological monitor with appropriate state and federal permits shall survey the fenced-in areas and determine the presence of snakes. If present, the monitor shall relocate snakes a minimum of 500 feet from construction activities. During construction, the monitor shall be present on-site to ensure that no snakes are in the disturbance area, that all excavated areas are backfilled or covered, and to educate the construction personnel as appropriate.

Cultural
Resources a) Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? Modified MM CUL-01: (Ground Inspection) Pre-Construction Crew Training. Prior to start of construction, the City of Escalon shall hire a qualified archaeologist and tribal monitor to conduct pre-construction tailgate training for the construction crew. The training can be videotaped for crew added later during construction. Training shall be documented with a sign-in sheet and written materials including photos of cultural materials as follows: • historic artifacts such as glass bottles and fragments, cans, nails, ceramic and pottery fragments, and other metal objects; • historic structural or building foundations, walkways, cisterns, pipes, privies, and other structural elements; • prehistoric flaked-stone artifacts and debitage (waste material), consisting of obsidian, basalt, and or cryptocrystalline silicates; • groundstone artifacts, including mortars, pestles, and grinding slabs; • dark, greasy soil that may be associated with charcoal, ash, bone, shell, flaked stone, groundstone, and fire-affected rocks. Prior to the start of construction. Project archeologist, tribal monitor, Project contractor, City of Escalon Date: ________ Initials: _______ Modified MM CUL-02: Discovery of Buried Cultural Resources. Throughout Project construction, the contractor shall maintain records of field crew training per Modified MM CUL-01: (Ground Inspection) Pre- Throughout Project construction. Project contractor, field personnel, Project Date: ________

Page 384 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 50 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Cultural
Resources a) Continued….

Construction Crew Training and a cultural resources monitor shall be present at the site to document any cultural resources encountered during construction with photos, georeferencing, and maps. If field personnel encounter buried cultural materials, work in the immediate vicinity of the find should cease within 50 feet of the resources and the City and a qualified archaeologist should be contacted immediately to assess the significance of the find. The qualified archaeologist shall have the authority to stop or divert construction and excavation as necessary. If the qualified archaeologist finds that any cultural resources present meet eligibility requirements for listing on the California Register or the National Register, plans for the treatment, evaluation, and mitigation of impacts to the find will need to be developed. archeologist, cultural resources monitor
Initials: _______
b) Cause a substantial adverse
change in the significance of an archaeological resource pursuant to § 15064.5? MM CUL-03: Cultural Resources Treatment and Disposition. Immediately upon discovery of buried resources encountered during construction, the contractor shall cease work in the immediate vicinity of the find pursuant to Modified MM CUL-02: Discovery of Buried Cultural Resources and allow the qualified archaeologist to determine: a) if any cultural resources are significant or meet eligibility requirements for listing on the California Register or the National Register; b) to identify appropriate disposition measures for proper treatment through protection in place or collection and curation to the find; and c) contact Native American tribes from NAHC’s SLF Search to determine the important of the find. Upon the discovery of buried resources during Project construction. Project contractor, Project archeologist, Native American Tribes Date: ________ Initials: _______ See Mitigation Measure Modified MM CUL-01: (Ground Inspection) PreConstruction Crew Training. Prior to the start of construction. Project archeologist, tribal monitor, Project contractor, City of Escalon
Date: ________ Initials: _______
See Mitigation Measure Modified MM CUL-02: Discovery of Buried Cultural Resources
Throughout Project
construction.

Project contractor, field personnel, Project archeologist Date: ________ Initials: _______
c) Disturb any human remains,
including those interred outside of dedicated cemeteries? MM CUL-04: Discovery of Human Remains: If human remains are encountered during construction, the contractor shall notify the County Coroner of the find immediately. If the remains are determined to be In the event human remains are discovered during
County Coroner, NAHC, Project contractor, MLD
Date: ________

Page 385 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 51 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Cultural
Resources c) Continued…
prehistoric, the coroner will notify the NAHC, which will determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 48 hours of notification by the NAHC.

Project construction.

Initials: _______
See Mitigation Measure Modified MM CUL-02: Discovery of Buried Cultural Resources
Throughout Project
construction.

Project contractor, field personnel, Project archeologist Date: ________ Initials: _______
Geology and
Soils a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving: ii. Strong seismic ground shaking? Modified MM GEO-01: Seismic Design Criteria. Facility design shall comply with the site-specific seismic design criteria recommendations of a geotechnical engineer. Facility design shall also comply with the seismic design requirements of the UBC and with applicable provisions and policies of the San Joaquin County General Plan. Prior to the issuance of building permits. City of Escalon, geotechnical engineer Date: ________ Initials: _______ Modified MM GEO-02: Geotechnical Design Criteria- Facility design shall comply with the site-specific geotechnical design criteria recommendations of a geotechnical engineer, applicable requirements of the UBC, and applicable provisions and policies of the San Joaquin County General Plan. Prior to the issuance of building permits. City of Escalon, geotechnical engineer Date: ________ Initials: _______ b) Result in substantial soil erosion or the loss of topsoil? See Mitigation Measure Modified MM HYDRO-01: Stream Crossings. Prior to final approval of Project Plans and Specifications. City of Escalon Engineering Staff Date: ________ Initials: _______ See Mitigation Measure Modified MM HYDRO-03: Erosion Control. Prior to the final approval of Project Plans and prior to the start of construction. City of Escalon Engineering Staff Date: ________ Initials: _______ f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? MM PALEO-01- Paleontological Resource Mitigation Program: Prior to the start of Project construction, the City of Escalon shall hire a qualified paleontologist to conduct pre-construction tailgate trailing for the construction crew and monitoring during ground disturbance. The Prior to the start of Project construction. City of Escalon, Project archeologist Date: ________ Initials: _______

Page 386 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 52 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Geology and
Soils
f) Continued…
training can be videotaped for crew added later during construction. Training shall be documented with a sign-in sheet and written materials including photos of potentially significant paleontological resources.

In addition, the City’s paleontologist shall prepare and implement a Paleontological Resource Mitigation Program to monitor, salvage, and curate any recovered fossils which will be funded by the City. Throughout Project construction, the Project contractor shall maintain records of field crew training and monitoring and shall document any paleontological resources encountered during construction with photos, georeferencing, and maps. If field personnel encounter buried paleontological resources, work in the immediate vicinity of the find should cease within 50 feet of the resource and the City and a qualified paleontologist should be contacted immediately to assess the significance of the find. A qualified paleontologist shall have the authority to stop or divert construction and excavation as necessary.

Hydrology and Water Quality c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: i. result in a substantial erosion or siltation on- or off-site; Modified MM HYDRO-01: Stream Crossings- Prior to final approval of the Project Plans and specifications and the start of Project construction, the City of Escalon Engineering staff shall verify that standard design criteria for pipeline installation at stream crossings using the jack and bore method prevents destabilization of the streambed and banks. The Project design shall locate the pipe far enough below streambeds and site the boring entry location and boring slope at a significant distance from the streambank to avoid a future encounter between the pipeline and surface water due to stream downcutting or lateral migration. Prior to final approval of Project Plans and Specifications and during inspections throughout construction. City of Escalon Engineering Staff and project contractor Date: ________ Initials: _______ Modified MM HYDRO-02: SWPPP Specifications- Prior to the certification and approval of Project Plans and the start of Project construction, the City of Escalon Engineering staff shall verify that the Project contractor develops and implements a SWPPP, as required by the SWRCB and enforced by the CVRWQCB, for areas to be disturbed by construction activities. SSJID and the City of Escalon shall incorporate into contract specification the requirement that the contractor comply with, and implement the provisions of, the SWPPP and the RWQCB requirements for the NPDES General Permit for Discharges of Storm Water Associated Throughout Project construction activities. Project contractor Date: ________ Initials: _______

Page 387 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 53 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Hydrology and
Water Quality c) i) Continued….
with Construction Activity. The SWPPP should be kept on site during construction and implementation shall be recorded with the SWPPP. The objectives of the SWPPP are to identify pollutant sources that may affect the quality of stormwater discharge, to implement control practices to reduce pollutants in stormwater discharges, and to protect receiving water quality. The SWPPP may include, but is not limited to, the following elements: - Preparation of a site map; - Description of construction materials, practices, and equipment storage and maintenance; - List of pollutants likely to contact stormwater; - Estimate of the construction site area and percentage impervious area; - Site-specific erosion and sedimentation control measures including soil stabilization, revegetation, and runoff control to limit increases in sediment in stormwater runoff, such as detention basins, straw bales, silt fences, geo-fabrics, drainage swales, and sandbag dikes; - List of provisions to eliminate or reduce discharge of materials to stormwater including practices to minimize the contact of construction materials with stormwater; - Stockpiling of soils along the trench may be on the side of the trench farthest from the nearest creek or drainage where possible; - BMPs for fuel and equipment storage, refueling activities, and equipment inspections to prevent chemicals from contacting stormwater; - Description of waste management practices; and - Maintenance and training practices. Modified MM HYDRO-03: Erosion Control- Prior to the issuance of permits and Project construction activities, the City of Escalon shall incorporate into contract specifications requirements that the contractor(s) implement erosion control measures as well as RWQCB requirements for stormwater pollution prevention for construction activities. The contractor shall be required to exercise special care to Prior to the final approval of Project Plans and prior to the start of construction.

City of Escalon Engineering Staff Date: ________
Initials: _______

Page 388 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 54 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Hydrology and Water Quality c) i) Continued….
prevent erosion in disturbed earth areas, and silt or eroded materials may not be introduced into any storm drain system or watercourse during and following construction. The contractor shall also apply erosion control measures as outlined within Modified MM HYDRO-02: SWPPP Specifications(revegetation, soil stabilization, stray bales, silt fences, etc.) where indicated on contract drawings and where the contractor has disturbed natural vegetation. For construction adjacent to, or crossing any waterways, the City of Escalon shall obtain and comply with any necessary permits from state and local jurisdictions. MM HYDRO-04: Lead Agency Approval of Project Plans- Prior to final approval of the Project Plans and start of construction, City of Escalon Engineering staff shall verify that Project Plans implement the following measures to ensure water quality BMPs are maintained:
a) The generator, fuel tank, containment areas, controls, and transfer switches should be mounted and anchored securely above the expected flood level on a concrete platform inside or next to the building in a protective structure and shielded from wind or windborne debris. At a minimum, the generator should be placed above the main electrical service equipment and above the utility company pad mount transformer with containment. b) The location of the emergency generator’s transfer switch(es), and all electrical distribution equipment so that the generator switches are at elevations that are at least as high as the generator. c) Provide adequate access to the new generator so that related operating measures, chemicals, and processes are above the floodplain and accessible during storms and emergencies. d) If a fuel tank is provided on-site, provide containment and anchor tank to resist floatation.
e) Flood-proof any chemicals, process, or operations for the generator within the floodplain
Prior to the finalization of Project plans.

City of Escalon Engineering Staff, Project contractor
Date: ________ Initials: _______

Page 389 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 55 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Hydrology and Water Quality c) i) Continued….
f) Provide an approved operational plan for the Project to relocate chemicals above the floodplain in advance of a flood event. g) Verify that the local code requirements and standards and appropriate regulations of the utility companies are incorporated in Project plans h) Verify that Construction Plans incorporate all local and national building codes, as well as applicable electrical codes for the safety of site personnel. i) All fuel supply and electrical lines must be protected from potential flooding and high wind.
j) A consistent and regularly planned maintenance program should be developed, adopted, and enforced.
k) The City Engineer shall verify that construction within the floodway and flood zone will occur outside of the rainy season (October 15 through April 15). Active construction within the floodway and flood zone will not occur during rain events. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:iv. impede or redirect flood flows? BEST MANAGEMENT PRACTICESBMP HYDRO-05: Construction within Riverine Floodway- Prior to Project construction and final approval of Project plans, the City of Escalon’s Engineering staff and San Joaquin County Flood Management Division shall verify that Project Plans and Specifications contain the following measures to minimize impacts within FEMA-designated flood Zone A and AE:

1. A minimum of two (2) surveys are required; one before and one after construction. The first survey establishes the elevation of the project site and is compared to the BFE to determine the height above grade that flood damage reduction measures must be taken. Based on this initial survey, the “Preliminary Elevation Certificate” an FM form series must be completed by a surveyor or engineer and is required prior to clearance from Public Works. If your plans/ application package does not include a completed FM-1 you cannot proceed to the Community Development Building for a plan check (SJ SFHA Construction Requirements); Prior to the finalization of Project Plans and Specifications.

City of Escalon, Project contractor, San Joaquin County Flood Management Division Date: ________ Initials: _______

Page 390 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 56 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Hydrology and Water Quality c) iv) Continued… 2. All utilities, machinery, equipment, tanks, and wells are required to be elevated above the BFE or be designed, constructed, and installed to prevent floodwaters from entering or accumulating within its components. For additional information, see ASCE 24-05 Chapter 7(SJ SFHA Construction Requirements); 3. Upon the competition of daily Project activities within the flood zones, the Project contractor shall ensure that debris, trash, loose branches, and vegetation have been removed from Lone Tree Creek or riverbanks. Vegetation that is actively growing in the stream bank should not be removed without permission. Prior to any removal of streamside vegetation or to report any observations of the clearing of vegetation or trees on stream banks, contact San Joaquin County Channel Maintenance Division at 209.468.9698 (SJ Hazards in San Joaquin County); 4. Utilize methods and practices that minimize flood damage, throughout Project construction (Escalon Municipal Code Section 17.32.130 Standards of Construction); 5. Electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designated and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding (Escalon Municipal Code Section 17.32.130 Standards of Construction); 6. All new and replacement water supply and sanitary systems shall be designated to minimize or eliminate infiltration of flood waters into the systems; and discharge from the systems into flood waters (Escalon Municipal Code Section 17.32.150 Standards of Utilities).

Page 391 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 57 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Hydrology and Water Quality
c) iv) Continued…
See Mitigation Measure Modified MM HYDRO-02: SWPPP. Throughout Project construction activities.

Project contractor
Date: ________ Initials: _______
See Mitigation Measure Modified MM HYDRO-03: Erosion Control. Prior to the final approval of Project Plans and prior to the start of construction.

City of Escalon Engineering Staff Date: ________
Initials: _______
e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? MM HYDRO-02: Prevent Stormwater Pollution Throughout Project construction activities.

Project contractor
Date: ________ Initials: _______
Land Use and
Planning a) Physically divide an established community? Modified MM LAND-01: Landowner Consultation- The City of Escalon shall consult with all potentially affected landowners associated with the segments of the selected alignment that crosses farmland as part of the land acquisition process. As part of this acquisition process Escalon and the landowners shall negotiate an agreed-upon compensation for the loss of any existing orchard trees and/ or vines currently in production. During these consultations, Escalon shall also, in conjunction with landowners’ input, access gates. Access gate locations shall be included in the final design plans for the proposed Project. Modified MM TRAF-16: Routing Traffic Adjacent to Active Agriculture Operations provides for controlled access for vehicle traffic associated with active agricultural operations in farmland areas. Prior to the start of Project construction and certification of Project Design. The City of Escalon, local Landowners Date: ________ Initials: _______ Modified MM LAND-02: Advance Notice- The City of Escalon shall provide a minimum 2-week advance notice of the construction activities schedule to the affected community members adjacent to construction areas (e.g., residences, property owners, business owners, and public facility operators), including the posting of signs. Two weeks prior to Project construction activities. The City of Escalon Date: ________ Initials: _______ Modified MM LAND-03: Construction Contract Documents- The City of Escalon shall incorporate mitigation measures in construction contract documents (e.g., terms of schedule or access conditions or technical Prior to the finalization of The City of Escalon, Project contractor Date: ________

Page 392 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 58 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Land Use and
Planning a) Continued…
requirements). The City and its contractor(s) shall coordinate with local jurisdictions and obtain all necessary permits (e.g., encroachment permit, utility excavation permit), shall comply with permit conditions established to minimize construction impacts, and shall assign an inspector to the Project to oversee construction activities. Project construction contract documents. Initials: _______ Modified MM LAND-04: Operation of Project Components – The City of Escalon shall implement mitigation measures described in the Air Quality and Noise Section. Throughout the implementation of the proposed Project.

The City of Escalon, Project contractor
Date: ________ Initials: _______
Noise a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the Project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? MM NOI-01: Construction Noise Attenuation- 1. During all Project Site excavation and grading, construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturer standards. 2. The contractor shall place all stationary construction equipment so that emitted noise is directed away from the noise-sensitive receptors nearest the project site. One-inch plywood or acoustic blankets capable of achieving a reduction level of at least 10 dB shall be used to keep equipment noise from exceeding the 80 dBA noise level standard. 3. Equipment shall be shut off and not left to idle when not in use. 4. Whenever possible, electric power will be used instead of internal combustion engine power. 5. The contractor shall locate equipment staging in areas that will create the greatest distance between construction-related noise/vibration sources and sensitive receptors nearest the Project Site during all project construction. 6. Jackhammers, pneumatic equipment, and all other portable stationary noise sources shall be shielded, and noise shall be directed away from sensitive receptors. 7. The Project proponent shall mandate that the construction contractor prohibit the use of music or sound amplification on the Project Site during construction. Throughout Project construction. City of Escalon, Project contractor Date: ________ Initials: _______

Page 393 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 59 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Noise a) Continued… 8. The construction contractor shall limit haul truck deliveries to the same hours specified for construction equipment. MM NOI-02: Stationary Source Noise- Option 1 Prior to Project construction, the Project contractor and the City of Escalon shall verify with sound measurements that the 125-kW diesel generator does not exceed 82 dB at 3 feet or a sound power level of 90; along with the proposed 25 Hp with a sound pressure level of 80 dB at 3 feet (sound power level of 88) and the proposed HVAC condenser with a sound pressure level of 62 dB at 3 feet (power level of 70). See Figure 13: BPS Operational Noise Levels. In addition, to ensure that operational noise levels do not exceed 65 CNEL during high demand, the Project contractor and City engineers shall require (measure, confirm, and monitor during site inspections) on an ongoing basis each 50 Hp pump does not have a noise level that exceeds 64 dB at a distance of 3 feet (sound power level of 72). See Figure 13: BPS Operational Noise Levels. OR Option 2 Prior to the issuance of building and grading permits, the City of Escalon engineering department shall verify Project plans including the construction of a 10-foot-high concrete barrier along the northern edge of the pad proposed for the pumps and a 7-foot-high barrier along the eastern boundary of the Booster Pump Station. See Figure 13: BPS Operational Noise Levels. OR Option 3 Prior to the issuance of building and grading permits, the City of Escalon engineering department shall verify Project plans including the construction of an 8-foot-high concrete barrier along the northern boundary of the existing parking lot and a 6-foot barrier along the eastern Throughout Project construction.

City of Escalon, Project contractor Date: ________
Initials: _______

Page 394 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 60 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
edge of the pump area pad, parallel to Escalon-Bellota Road. Figure 13:

BPS Operational Noise Levels. Public Services a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:

I. Fire Protection?
II. Police Protection?
III. Schools?
IV. Parks?
See Mitigation Measure Modified MM TRAF-01: Traffic Control Plan. Upon finalizing the Project plans
City of Escalon, Licensed Traffic Engineer
Date: ________ Initials: _______
I. Schools? See Mitigation Measure Modified MM TRAF-02: Coordinate Traffic Plan with EUSD.

Prior to Project
construction
City of Escalon, Escalon Unified School District, Project contractor Date: ________ Initials: _______
Transportation b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? Modified MM TRAF-01: Traffic Control Plan- Upon the finalization of a detailed pipeline alignment design, the City of Escalon shall arrange for a Traffic Control Plan to be prepared by a licensed traffic engineer, for all project-affected roadways and intersections. The Traffic Control Plan shall comply with requirements in encroachment permits issued by San Joaquin County. The Traffic Control Plan to be prepared by the construction contractors shall include, but not be limited to, the following measures: - Maintain the maximum amount of travel lane capacity during non- construction periods, with all trenches covered with steel plates, and provide flagger control at all construction sites to manage traffic control. Upon finalizing the Project plans City of Escalon, Licensed Traffic Engineer Date: ________ Initials: _______

Page 395 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 61 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Transportation b) Continued… - Limit the construction work zone in each block to a width that, at a minimum maintenance alternates one-way traffic flow past the construction zone. Alternatively, use detour signing on alternate access streets when temporary full streets closure is required. - Restrict construction to non-peak traffic periods as required for specific work sites in encroachment permits. Weekend and night work shifts may be considered in non-residential areas only. - Coordinate construction activities (time of year and duration) to minimize traffic disturbances adjacent to commercial areas (e.g., avoid the peak of Christmas, and holiday shopping period), dairies, and the Atlanta Cemetery. - Post advanced warnings of construction activities(e.g., signs, articles in newspapers, notices on radio/TV, etc.) to allow motorists to select alternative routes in advance. d) Result in inadequate emergency access? Modified MM TRAF-02: Coordinate Traffic Plan with EUSD - Prior to Project construction, the City of Escalon shall develop comprehensive strategies for maintaining emergency access for sensitive land uses such as Escalon police and fire stations, and Escalon Unified School District in consultation with the facility owner or administer, as part of the Traffic Control Plan for roadway segments and intersections. Strategies shall include but are not limited to, maintaining steel trench plates at the construction sites to restore access across open trenches, parking of fire trucks outside the firehouse on the side of the street opposite the construction during affected work hours, and identification of alternate routing around construction zones. Also, police, fire, and other emergency service providers shall be notified of the timing location, and duration of construction activities throughout the project, and the location of detours and lane closures. In addition, the Project contractor must share the traffic control plan with the Escalon Unified School District to coordinate best management practices during peak operational hours (pickup and drop-offs) at Escalon High School. Prior to Project construction City of Escalon, Escalon Unified School District, Project contractor Date: ________ Initials: _______ Modified MM TRAF-03: Advanced Notice- Prior to construction activities along the Project alignment and at the site of the FCF, and BPS, the City of Escalon shall require a minimum 72-hour advance notice of access Prior to construction activities along the Project alignment City of Escalon Date: ________

Page 396 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 62 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Transportation d) Continued… restrictions for residents and businesses. Affected residents and businesses shall be advised of the requirements for moving motor vehicles out of the area to be closed. and site of FCF and BPS Initials: _______ Modified MM TRAF-04: Off-Street Construction Parking- During construction activities, the City of Escalon may require the contractor(s) to provide off-street parking for construction worker’s vehicles in the vicinity of the work zone, or workers may be shuttled to the work from an off-site location. During construction activities City of Escalon, Project contractor(s) Date: ________ Initials: _______ Modified MM TRAF-05: Warning Signs- As part of the Traffic Control Plan(s) for roadway segments and intersections, the City of Escalon shall ensure that such plans stress advance “Road Work Ahead” warning signs and speed control (including signs informing drivers of State-legislation double fines for speed infractions in a construction zone) to achieve required speed reductions for safe traffic flow through the work zone. During construction activities City of Escalon, Project contractor(s) Date: ________ Initials: _______ Modified MM TRAF-06: Bicyclists and Pedestrians- Prior to construction activities, the City of Escalon shall incorporate into contract specifications for all project components that require that traffic control plans include detours for bicyclists and pedestrians in all areas potentially affected by project construction. Prior to Project construction City of Escalon, Project contractor(s) Date: ________ Initials: _______ Modified MM TRAF-07: Encroachment Permit- Before the approval of Project plans, the City of Escalon shall obtain encroachment permits from affected jurisdictions before construction of the project, and comply with haul route designations, and roadway wear monitoring and repairs conditions. Prior to Project construction City of Escalon, Project contractor(s) Date: ________ Initials: _______

Page 397 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 63 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials Tribal Cultural
Resources a) Would the Project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or ii. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe. MM TRI-01: Agreements, Consulting, and Monitoring with Affiliated Tribes. Prior to the issuance of grading or building permits, the City of Escalon shall secure agreements with Consulting Tribes for monitoring. The City will be required to provide 30 days’ advanced notice to the tribes of all ground-disturbing activities. The Native American Tribal Representatives shall have the authority to temporarily halt and redirect earth-moving activities in the affected area if suspected tribal resources are unearthed. The Native American Monitor(s) shall attend the pre- construction crew training with the Project Archaeologist, City, the construction manager, and any contractors pursuant to Modified MM CUL-01: (Ground Inspection) Pre-Construction Crew Training. The training will include a Tribal Perspective of the mandatory Cultural Resources Worker Sensitivity Training for those in attendance. Prior to the issuance of grading or building permits City of Escalon, Consulting Tribes Date: ________ Initials: _______ MM TRI-02: Diversity of Buried Tribal Cultural Resources. If sub-surface cultural resources are discovered during ground-disturbing activities (inadvertent discoveries), the following shall be carried out for final disposition of the discoveries: 1. Preservation-in-Place: The cultural resource shall be preserved in place by the Project contractor if possible. Preservation-in- Place means avoiding the resources and leaving them in place where they were found with no development affecting the integrity of the resources. All work around the inadvertent discoveries shall be halted until the Project archeologist or representative from a Consulting Tribe is notified and onsite for retrieval. 2. Notify Consulting Tribes: Prior to the reburial or resuming construction activities, tribes must be notified immediately by the District regarding the treatment and disposition of artifacts. 3. Reburial: Onsite reburial of the discovered items shall be reburied; and the reburial area shall be protected from any future impacts in perpetuity. Reburial shall not occur until all legally required cataloging and basic recordation have been completed. No recordation of sacred items is permitted without the written consent of all Consulting Tribes. The In the event, subsurface cultural resources were discovered during ground-disturbing activities. City of Escalon, Project contractor, Project archeologist or representative from a Consulting Tribe Date: ________ Initials: _______

Page 398 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 64 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Tribal Cultural
Resources a) i) &ii) Continued…
location for the future reburial area shall be identified on a confidential exhibit on file with the City and concurred to by the Consulting Tribes prior to certification of the environmental document. SC TRI-01: AB 52: Prior to Project construction, the City of Escalon shall complete coordination with the local tribes pursuant to AB 52. If a response has not been received within two weeks of notification, the City of Escalon might follow up with a telephone call or email to ensure that the Project information has been received and reviewed by each respective tribe.

Prior to Project construction
City of Escalon, Consulting Tribes Date: ________
Initials: _______
Utilities and Services a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Modified MM UTL-01- Existing Utilities- A detailed study identifying utilities within areas subject to earthwork with the Project construction shall be conducted during the pre-design stages of the Project. For project components with utility conflicts, the following mitigations are identified: - Utility excavation or encroachment permits shall be required from the appropriate agencies. These permits include measures to minimize utility disruption. The City and its contractors shall comply with permit conditions, and such conditions shall be included in construction contract specifications. - Utility locations shall be verified through field survey (potholing) and use of the Underground Service Alert (USA) services. - Detailed specifications shall be prepared as part of the design plans to include procedures for the excavation, support, and fill of areas around utility cables and pipes. All affected utility services shall be notified of the City’s construction plans and schedule. Arrangements may be made with these entities regarding protection, relocation, or temporary disconnection of services. - The City shall employ special construction techniques in areas where the water transmission pipeline is located parallel to wastewater pipelines. These special measures, which shall be included in the engineering specifications, may include trench Prior to Project construction and throughout Project construction. City of Escalon, Project contractor(s) Date: ________ Initials: _______

Page 399 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 65 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Utilities and Services a) Continued…
wall-support measures to guard against trench wall failure and possible resulting loss of structural support for the water pipeline. - Residents and businesses in the project area shall be notified of planned utility service disruption two to four days in advance, in conformance with county and state standards.

Modified MM UTL-02: Utility Conflicts- In order to reduce potential impacts associated with utility conflicts, the following measures shall be implemented in conjunction with Modified MM UTL-01- Existing Utilities: - Disconnected cables and lines shall be reconnected promptly - Based on the utilities investigation to be conducted by the City of Escalon shall consult with any entities having utility conflicts with the proposed project to negotiate relocation efforts or other plans to resolve the conflict. - The City of Escalon shall observe DHS standards Waterworks Standards found in the Cal. Code Regs. chapter 16 et. seq. and are under the authority of the State Water Resources Control Board, Division of Drinking Water which require: 1) a 10-foot horizontal separation between parallel sewer and water pipelines (gravity or force pipelines); 2) 1-foot vertical separation between perpendicular water and sewer line crossings (in the event that separation requirements may not be maintained, the City shall obtain DHS State Water Resources Control Board, Division of Drinking Water variance through provisions of sewer encasement, or other means deemed suitable by DHS State Water Resources Control Board, Division of Drinking Water); and 3) encasing water pipelines in protective sleeves where the pipeline crosses under or over an existing wastewater pipeline. Prior to Project construction and throughout Project construction. City of Escalon, Project contractor(s) Date: ________ Initials: _______ Wildfire a) Substantially impair an adopted
emergency response plan or
emergency evacuation plan?
See Mitigation Measure Modified MM TRAF-01: Traffic Control Plan. Upon finalizing the Project plans
City of Escalon, Licensed Traffic Engineer
Date: ________ Initials: _______
See Mitigation Measure Modified MM TRAF-02: Coordinate Traffic Plan with EUSD. Prior to Project construction City of Escalon, Escalon Unified Date: ________

Page 400 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
SEPTEMBER OCTOBER 2024
October 2024 Page 66 City of Escalon
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
School District, Project contractor Initials: _______

Page 401 of 440 ends

City of Escalon Connection to Nick DeGroot Water Treatment Plant Final Initial Study/ Mitigated Negative Declaration
State Clearinghouse No. 2024090184
October 2024 Page 67 City of Escalon

5.0 FINAL ISMND
This page was left intentionally blank.

Page 402 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 1
MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184 The following is a Mitigation Monitoring and Reporting Program (MMRP) for the City of Escalon Connection to Nick Groot Water Treatment Plant (Project) located in the southeastern corner of San Joaquin County, California. This MMRP has been prepared pursuant to Section 15097 of the CEQA Guidelines and Section 21081 of the Public Resources Code. This MMRP lists all applicable Project Mitigation Measures (MM), applicable Mitigation Measures previously approved by San Joaquin County via the South County Surface Water Supply Project EIR (SCH#98022018) (Modified MM), and environmental commitments for executing Standard Conditions (SC) that are required to be implemented with the Project under existing Plans, Programs, and Policies for environmental resource protection. This MMRP includes implementation timing and responsible party to ensure proper enforcement of all MM and SC to reduce Project impacts. The City of Escalon, the Lead Agency, will utilize the MMRP to document the implementation of Project mitigation and SC environmental commitments, which ensure all project impacts are reduced to less than significance pursuant to The California Environmental Quality Act (CEQA).

Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Aesthetics

c) In nonurbanized areas,
substanAally degrade the exisAng
visual character or quality of
public views of the site and its
surroundings? (Public views are
those that are experienced from
publicly accessible vantage point).

If the Project is in an urbanized
area, would the Project conflict
with applicable zoning and other
regulaAons governing scenic
quality?
MM AES-01: CoordinaAon with Private Landowners- Prior to the start of construcAon, the City and the contractor shall coordinate with private owners and obtain wriEen landowner approval for construcAon acAviAes on private property in the form of a signature on the plan sheet showing the proposed work. RestoraAon work on private property shall be agreed upon and approved by the landowner and the City in advance of construcAon. RestoraAon shall be cerAfied by the landowner and the City upon compleAon as adequately meeAng the City’s private landowner’s requirements.

Prior to the start of
construction.

City of Escalon,
Project contractor Date: ________
Initials: _______
Modified MM AES-04: Landscaping- Natural landscaping, which blends with the surrounding aesthetic features, shall be placed along the perimeter of the FCF and BPS.

Upon
implementation of
the proposed
Project
components.

City of Escalon,
Project contractor Date: ________
Initials: _______
d) Create a new source of substanAal
light or glare which would
adversely affect day or nighJme
views in the area?
MM AES-02: Construction Lighting Plan- If nighttime construction is planned to occur, the Project contractor must deploy the measures prior to and throughout nighttime construction activities (dusk to dawn).

Measures include directing light sources away from residential property or regularly occupied spaces. Elimination of uplighting will occur by angling light sources down and fitting light sources with covered bulbs, shields, and dimmers. Ensure that a 300-foot buffer from residential property lines is maintained throughout nighttime construction.

Throughout
nighttime
construction.

Project contractor
Date: ________
Initials: _______

Page 403 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 2
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Aesthetics

d) Continued… Modified MM AES-03: Lighting- Lighting at the FCF and BPS shall be positioned downward and shielded in order to prevent glare, and reduce offsite lighting, and disruption of adjacent neighbors.

Throughout Project
implementation and
design.

Project contractor
Date: ________
Initials: _______
Air Quality

c) Expose sensitive receptors to
substantial pollutant concentrations?
MM AQ-01: Fugitive Dust Control- For construction activities associated with all Project components: the City of Escalon shall require contractor(s) to implement the following measures throughout construction activities. These measures shall be incorporated in bid documents prior to City approval. The implementation of these measures shall be verified on an ongoing basis through construction inspections:
- Water, chemical soil stabilizers/ suppressants, or vegetaAve ground cover shall be used to control fugiAve dust from all disturbed areas, including storage piles, which are not in acAve use at the construcAon site.
- Water or chemical soil stabilizers shall be used to control fugiAve dust from all unpaved roads uAlized for construcAon access. - ApplicaAons of water or presoaking shall be performed to control fugiAve dust from all land clearing, grubbing, scraping, excavaAon, land leveling, grading, cut and fill, and demoliAon acAviAes. - Cover and wet all materials transported off-site or require all trucks to maintain at least size feet of freeboard from the top of the container.
- Remove accumulated mud directly from adjacent public streets at least every 24 hours during construcAon periods. (The use of dry rotary brushes is expressly prohibited, except where preceded or accompanied by sufficient weJng to limit the visible dust emissions.

The use of blower devices is also expressly forbidden.) - Water or chemical soil stabilizers/ suppressants shall be used to control fugiAve dust aOer each addiAon of materials to or removal of materials from all storage piles.
- Limit the speed of all construcAon vehicles to 15 miles per hour on unpaved roads.
- Re-plant vegetaAon in disturbed areas as quickly as possible.

Throughout Project
construction.

City of Escalon;
Project
contractor(s)
Date: ________
Initials: _______

Page 404 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 3
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Air Quality

c) Continued… MM AQ-02: (Compliance with SJVAPCD) Verify SJAPCD’s Control Measures. The contractor, City Engineer, and Inspectors shall verify that the SJVAPCD’s control measure is implemented as outlined below or equivalent to reduce fugitive dust emissions throughout all phases of construction. These measures shall be incorporated in bid documents prior to City approval. The implementation of these measures shall be verified on an ongoing basis through construction inspections:

1. Require construcAon equipment used at the site to be equipped with catalysts/parAculate traps to reduce parAculate and NOx emissions. These catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). At the Ame bids are made, contractors shall show that the construcAon equipment used is equipped with parAculate filters and/or catalysts or prove why it is infeasible.

2. Use alternaAve fuels and construcAon equipment.

3. Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set).

4. Install windbreaks on windward sides of construcAon areas.

5. Curtail construcAon during periods of high ambient pollutant concentraAons. This may include ceasing construcAon acAvity during peak-hour vehicular traffic on adjacent roadways, and “Spare the Air Days” declared by the District.

Throughout all
phases of Project
construction.

Project
contractor, City
Engineer, and
Inspectors
Date: ________
Initials: _______
SC AQ-01: Regular Cleaning of Track-out Areas. Before Project approval, the City Engineer shall confirm that the plans and specifications for the Project include a note requiring regular cleaning of track-out areas throughout each workday and at the end of each workday to clean dirt deposited on any public highway or street (SJVAPCD Rule 8041: Carryout and Trackout).

Prior to Project
approval
City of Escalon
Engineering
Department
Date: ________
Initials: _______
d) Result in other emissions (such as
those leading to odors) adversely
affecting a substantial number of
people?
See Mitigation Measures MM AQ-01: Fugitive Dust Control. Throughout Project construction.

City of Escalon;
Project
contractor(s)
Date: ________
Initials: _______

Page 405 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 4
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Air Quality

See Mitigation Measures MM AQ-02: (Compliance with SJVAPCD) Verify SJVAPCD’s Control Measures.

Throughout all
phases of Project
construction.

Project
contractor, City
Engineer, and
Inspectors
Date: ________
Initials: _______
Biological
Resources

a) Have a substanAal adverse effect,
either directly or through habitat
modificaAons, on any species
idenAfied as a candidate,
sensiAve, or special status species
in local or regional plans, policies,
or regulaAons, or by the California
Department of Fish and Game or
U.S. Fish and Wildlife Service?
MM BIO-01: Pre-construction Nesting Bird Clearance Surveys. If construction occurs between February 1st and August 31st, a p Preconstruction clearance surveys for nesting and protected birds and raptors should be conducted by a qualified biologist, pursuant to CDFW protocol and as delineated below, within fifteen (15) days and three (3) days in advance of the start of any vegetation removal or ground disturbing activities and mobilization for the Project. Pre-construction surveys are intended to identify active nests and other evidence of protected species so that construction can completely avoid species that are protected under the MBTA and Fish, Game Code and that applicable agency protocol can be implemented so ensure that no nesting migratory birds, protected birds or raptors will be disturbed during construction.

Survey Report: The biologist conducting the clearance surveys should document a negative survey with a brief letter report for each survey indicating that no impacts to active avian nests or protected species will occur or stating whether additional protocol surveys or protections are warranted. If an active avian nest is discovered during the preconstruction clearance survey, construction activities should stay outside of a
No Disturbance Buffer: A no-disturbance buffer or alternative method approved by CDFW that will be established by the City’s biologist to protect any species and active nests. The size of the no-disturbance buffer will be determined by the wildlife biologist and will depend on the level of noise and/or surrounding anthropogenic disturbances, line of sight between the nest and the construction activity, type and duration of construction activity, ambient noise, species habituation, and topographical barriers. These factors will be evaluated on a case-by-case basis when developing buffers and distances. Limits of construction to avoid an active nest or species take will be established in the field with flagging, fencing, or other appropriate barriers; and construction If construction
occurs between
February 1st and
August 31st
Prior to start of
construction or
mobilization
City of Escalon,
Project biologist,
contractor
Date: ________
Initials: _______

Page 406 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 5
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
Biological
Resources

a) Continued… personnel will be instructed on the sensitivity of nest areas and species locations so that disturbance, take, possession, and destruction of any protected birds or raptors is completely avoided.

Biological Monitor: A biological monitor should be present to delineate the boundaries of the buffer areas and to monitor the active nest, protection in place, or relocations to ensure that protected species and nesting behavior is not adversely affected by the construction activity.

Once the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions or if the biologist deems that there is no potential for impacts on protected species, construction activities within the buffer area can occur.
• The contractor shall inspect construcAon and
staging/stockpiles daily at the start and end of each day for wildlife and verify that storage areas are covered and secured.

If wildlife is encountered within these areas, the contractor shall immediately contact the city’s biologist to determine and implement appropriate handling and next steps.

Swainson’s Hawk: A qualified biologist shall conduct a SWHA survey within a minimum 1/2-mile radius around the project. Surveys should be conducted according to the following the five-period schedule in accordance with the “Recommended Timing and Methodology for Swainson's Hawk Nesting Surveys in California's Central Valley (Swainson's Hawk Tech. Advis. Comm., 5/2000)”:
• January to March 20- One (1) Survey, All Day
• March 20 to April 5- Three (3) Surveys, Sunrise to 1000 / 1600 to Sunset
• April 5 to April 20- Three (3) Surveys, Sunrise to 1200 / 1630 to Sunset
• April 21 to June 10- Monitoring

Page 407 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 6
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Biological
Resources

a) ConAnued…
• June 10 to July 30- Three (3) Surveys, Sunrise to 1200 / 1600 to Sunset
If an occupied nest is found and may be impacted by project activities, the project proponent should consult with CDFW and demonstrate compliance with CESA. CDFW is responsible for ensuring appropriate conservation of fish and wildlife resources including threatened, endangered, and/or candidate plant and animal species, pursuant to CESA. CDFW recommends that a CESA Incidental Take Permit (ITP) be obtained if the project has the potential to result in “take” (Fish & G. Code § 86 defines “take” as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill”) of CESA-listed species, either through construction or over the life of the project.

Modified MM BIO-02: Ground Nesting Raptors Pre-construction SurveyPrior to Project construction, the City of Escalon shall retain a qualified biologist to conduct a survey for ground and other nesting raptors (in March or April) 30 fifteen (15) days and repeated 3 days prior to construction activities (i.e., grading) in areas containing suitable nesting habitat. Active raptor nests located within 500 feet of construction activity shall be mapped.

Prior to Project
construction.

City of Escalon,
Project biologist Date: ________
Initials: _______
Modified MM BIO-03: Raptor Nests- If active raptor nests are located on or within 500 feet of a construction site, a minimum of a 500 feet buffer area shall be established by a qualified biologist and construction activities shall be prohibited within this buffer zone until the end of the nesting season (April through August) or until the young have fledged. A qualified wildlife biologist shall monitor the nest to determine when the young have fledged and submit weekly reports to CDFW throughout the nesting season.

If active raptor nests
are located on or
within 500 feet of a
construction site.

City of Escalon,
Project
contractor(s),
Project biologist
Date: ________
Initials: _______
Modified MM BIO-04: Active Nests- Prior to construction activities, the City of Escalon in coordination with the Project contractor and qualified biologist shall identify trees with active nests. Active nests shall only be removed prior to the onset of the nesting season (March) or after the young have fledged (late August).

Prior to construction
activities.

City of Escalon,
Project
contractor(s),
Project biologist
Date: ________
Initials: _______

Page 408 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 7
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Biological
Resources

b) Have a substanAal adverse effect
on any riparian habitat or other
sensiAve natural community
idenAfied in local or regional plans,
policies, regulaAons, or by the
California Department of Fish and
Game or U.S. Fish and Wildlife
Service?
b) Continued…
Modified MM BIO-05: Jack and Bore Construction- At jack and bore locations, bore pits shall be excavated at least 50 feet outside the edge of riparian vegetation to avoid impacts. A biological monitor shall be present during staking for jack and bore and during jack and bore construction to alert the construction crew to the possible presence of any special-status amphibian or reptile at risk during the crossing. The following measures shall be implemented:
- ConstrucAon at stream crossings with riparian and/or emergent vegetaAon shall be limited to facilitate detecAon and reduce the potenAal of direct mortality for snakes. The USFWS Sacramento Field office shall be contacted in the event that construcAon needs to occur between October 2 and April 30 to determine if addiAonal measures are necessary to minimize and avoid take.
- Two weeks prior to any ground-disturbing acAvity at stream crossings with riparian and/or emergent vegetaAon, the bore pit, staging area, and access routes shall be fenced with snake-proof fencing that will be installed under supervision of the city’s biologist. Two days prior to construcAon, a biological monitor with appropriate state and federal permits shall survey the fenced-in areas and determine the presence of snakes. If present, the monitor shall relocate snakes a minimum of 500 feet from construcAon acAviAes. During construcAon, the monitor shall be present on-site to ensure that no snakes are in the disturbance area, that all excavated areas are backfilled or covered, and to educate the construcAon personnel as appropriate.

Prior to and
throughout jack and
bore construction.

City of Escalon,
Project
contractor(s),
Project biologist
Date: ________
Initials: _______
Cultural
Resources

a) Cause a substanAal adverse
change in the significance of an
archaeological resource pursuant
to § 15064.5?
Modified MM CUL-01: (Ground Inspection) Pre-Construction Crew Training. Prior to start of construction, the City of Escalon shall hire a qualified archaeologist and tribal monitor to conduct pre-construction tailgate training for the construction crew. The training can be videotaped for crew added later during construction. Training shall be documented with a sign-in sheet and written materials including photos of cultural materials as follows:
• historic arAfacts such as glass boEles and fragments, cans, nails, ceramic and poEery fragments, and other metal objects;
• historic structural or building foundaAons, walkways, cisterns, pipes, privies, and other structural elements;
Prior to the start of
construction.

Project
archeologist,
tribal monitor,
Project
contractor, City of
Escalon
Date: ________
Initials: _______

Page 409 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 8
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Cultural
Resources

a) Continued….
• prehistoric flaked-stone arAfacts and debitage (waste material), consisAng of obsidian, basalt, and or cryptocrystalline silicates;
• groundstone arAfacts, including mortars, pestles, and grinding slabs;
• dark, greasy soil that may be associated with charcoal, ash, bone, shell, flaked stone, groundstone, and fire-affected rocks.

Modified MM CUL-02: Discovery of Buried Cultural Resources.

Throughout Project construction, the contractor shall maintain records of field crew training per Modified MM CUL-01: (Ground Inspection) PreConstruction Crew Training and a cultural resources monitor shall be present at the site to document any cultural resources encountered during construction with photos, georeferencing, and maps. If field personnel encounter buried cultural materials, work in the immediate vicinity of the find should cease within 50 feet of the resources and the City and a qualified archaeologist should be contacted immediately to assess the significance of the find. The qualified archaeologist shall have the authority to stop or divert construction and excavation as necessary.

If the qualified archaeologist finds that any cultural resources present meet eligibility requirements for listing on the California Register or the National Register, plans for the treatment, evaluation, and mitigation of impacts to the find will need to be developed.

Throughout Project
construction.

Project
contractor, field
personnel, Project
archeologist,
cultural resources
monitor
Date: ________
Initials: _______
b) Cause a substanAal adverse
change in the significance of an
archaeological resource pursuant
to § 15064.5?
MM CUL-03: Cultural Resources Treatment and Disposition. Immediately upon discovery of buried resources encountered during construction, the contractor shall cease work in the immediate vicinity of the find pursuant to Modified MM CUL-02: Discovery of Buried Cultural Resources and allow the qualified archaeologist to determine: a) if any cultural resources are significant or meet eligibility requirements for listing on the California Register or the National Register; b) to identify appropriate disposition measures for proper treatment through protection in place or collection and curation to the find; and c) contact Native American tribes from NAHC’s SLF Search to determine the important of the find.

Upon the discovery
of buried resources
during Project
construction.

Project
contractor,
Project
archeologist,
Native American
Tribes
Date: ________
Initials: _______

Page 410 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 9
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Cultural
Resources
See Mitigation Measure Modified MM CUL-01: (Ground Inspection) PreConstruction Crew Training.

Prior to the start of
construction.

Project
archeologist,
tribal monitor,
Project
contractor, City of
Escalon
Date: ________
Initials: _______
See Mitigation Measure Modified MM CUL-02: Discovery of Buried Cultural Resources
Throughout Project
construction.

Project
contractor, field
personnel, Project
archeologist
Date: ________
Initials: _______
c) Disturb any human remains,
including those interred outside of
dedicated cemeteries?
c) ConAnued…
MM CUL-04: Discovery of Human Remains: If human remains are encountered during construction, the contractor shall notify the County Coroner of the find immediately. If the remains are determined to be prehistoric, the coroner will notify the NAHC, which will determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 48 hours of notification by the NAHC.

In the event human
remains are
discovered during
Project
construction.

County Coroner,
NAHC, Project
contractor, MLD
Date: ________
Initials: _______
See Mitigation Measure Modified MM CUL-02: Discovery of Buried Cultural Resources
Throughout Project
construction.

Project
contractor, field
personnel, Project
archeologist
Date: ________
Initials: _______
Geology and
Soils

a) Directly or indirectly cause potential
substantial adverse effects, including
the risk of loss, injury, or death
involving:
ii. Strong seismic ground shaking?
Modified MM GEO-01: Seismic Design Criteria. Facility design shall comply with the site-specific seismic design criteria recommendations of a geotechnical engineer. Facility design shall also comply with the seismic design requirements of the UBC and with applicable provisions and policies of the San Joaquin County General Plan.

Prior to the issuance
of building permits.

City of Escalon,
geotechnical
engineer
Date: ________
Initials: _______
Modified MM GEO-02: Geotechnical Design Criteria- Facility design shall comply with the site-specific geotechnical design criteria recommendations of a geotechnical engineer, applicable requirements of the UBC, and applicable provisions and policies of the San Joaquin County General Plan.

Prior to the issuance
of building permits.

City of Escalon,
geotechnical
engineer
Date: ________
Initials: _______

Page 411 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 10
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Geology and
Soils
b) Result in substantial soil erosion or
the loss of topsoil?
See Mitigation Measure Modified MM HYDRO-01: Stream Crossings. Prior to final approval of Project
Plans and
Specifications.

City of Escalon
Engineering Staff Date: ________
Initials: _______
See Mitigation Measure Modified MM HYDRO-03: Erosion Control. Prior to the final approval of Project
Plans and prior to
the start of
construction.

City of Escalon
Engineering Staff Date: ________
Initials: _______
f) Directly or indirectly destroy a unique
paleontological resource or site or
unique geologic feature?
f) Continued…
MM PALEO-01- Paleontological Resource MiAgaAon Program: Prior to the start of Project construcAon, the City of Escalon shall hire a qualified paleontologist to conduct pre-construcAon tailgate trailing for the construcAon crew and monitoring during ground disturbance. The training can be videotaped for crew added later during construcAon.

Training shall be documented with a sign-in sheet and wriEen materials including photos of potenAally significant paleontological resources.

In addiAon, the City’s paleontologist shall prepare and implement a Paleontological Resource MiAgaAon Program to monitor, salvage, and curate any recovered fossils which will be funded by the City. Throughout Project construcAon, the Project contractor shall maintain records of field crew training and monitoring and shall document any paleontological resources encountered during construcAon with photos, georeferencing, and maps. If field personnel encounter buried paleontological resources, work in the immediate vicinity of the find should cease within 50 feet of the resource and the City and a qualified paleontologist should be contacted immediately to assess the significance of the find. A qualified paleontologist shall have the authority to stop or divert construcAon and excavaAon as necessary.

Prior to the start of
Project
construction.

City of Escalon,
Project
archeologist
Date: ________
Initials: _______
Hydrology and
Water Quality

c) SubstanAally alter the exisAng
drainage paEern of the site or
area, including through the
alteraAon of the course of a
Modified MM HYDRO-01: Stream Crossings- Prior to final approval of the Project Plans and specifications and the start of Project construction, the City of Escalon Engineering staff shall verify that standard design criteria for pipeline installation at stream crossings using the jack and bore Prior to final
approval of Project
Plans and
Specifications and
City of Escalon
Engineering Staff
and project
contractor
Date: ________
Initials: _______

Page 412 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 11
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Hydrology and
Water Quality

stream or river or through the
addiAon of impervious surfaces, in
a manner which would:
i. result in a substanAal
erosion or siltaAon onor off-site;
c) i) Continued….
method prevents destabilization of the streambed and banks. The Project design shall locate the pipe far enough below streambeds and site the boring entry location and boring slope at a significant distance from the streambank to avoid a future encounter between the pipeline and surface water due to stream downcutting or lateral migration.
during inspections
throughout
construction.

Modified MM HYDRO-02: SWPPP Specifications- Prior to the certification and approval of Project Plans and the start of Project construction, the City of Escalon Engineering staff shall verify that the Project contractor develops and implements a SWPPP, as required by the SWRCB and enforced by the CVRWQCB, for areas to be disturbed by construction activities. SSJID and the City of Escalon shall incorporate into contract specification the requirement that the contractor comply with, and implement the provisions of, the SWPPP and the RWQCB requirements for the NPDES General Permit for Discharges of Storm Water Associated with Construction Activity. The SWPPP should be kept on site during construction and implementation shall be recorded with the SWPPP. The objectives of the SWPPP are to identify pollutant sources that may affect the quality of stormwater discharge, to implement control practices to reduce pollutants in stormwater discharges, and to protect receiving water quality. The SWPPP may include, but is not limited to, the following elements:
- PreparaAon of a site map;
- DescripAon of construcAon materials, pracAces, and
equipment storage and maintenance;
- List of pollutants likely to contact stormwater;
- EsAmate of the construcAon site area and percentage
impervious area;
- Site-specific erosion and sedimentaAon control measures including soil stabilizaAon, revegetaAon, and runoff control to limit increases in sediment in stormwater runoff, such as detenAon basins, straw bales, silt fences, geo-fabrics, drainage swales, and sandbag dikes;
Throughout Project
construction
activities.

Project contractor
Date: ________
Initials: _______

Page 413 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 12
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Hydrology and
Water Quality

c) i) Continued….
- List of provisions to eliminate or reduce discharge of materials to stormwater including pracAces to minimize the contact of construcAon materials with stormwater;
- Stockpiling of soils along the trench may be on the side of the trench farthest from the nearest creek or drainage where possible;
- BMPs for fuel and equipment storage, refueling acAviAes, and equipment inspecAons to prevent chemicals from contacAng stormwater;
- DescripAon of waste management pracAces; and
- Maintenance and training pracAces.

Modified MM HYDRO-03: Erosion Control- Prior to the issuance of permits and Project construction activities, the City of Escalon shall incorporate into contract specifications requirements that the contractor(s) implement erosion control measures as well as RWQCB requirements for stormwater pollution prevention for construction activities. The contractor shall be required to exercise special care to prevent erosion in disturbed earth areas, and silt or eroded materials may not be introduced into any storm drain system or watercourse during and following construction. The contractor shall also apply erosion control measures as outlined within Modified MM HYDRO-02: SWPPP Specifications(revegetation, soil stabilization, stray bales, silt fences, etc.) where indicated on contract drawings and where the contractor has disturbed natural vegetation. For construction adjacent to, or crossing any waterways, the City of Escalon shall obtain and comply with any necessary permits from state and local jurisdictions.

Prior to the final
approval of Project
Plans and prior to
the start of
construction.

City of Escalon
Engineering Staff Date: ________
Initials: _______
MM HYDRO-04: Lead Agency Approval of Project Plans- Prior to final approval of the Project Plans and start of construction, City of Escalon Engineering staff shall verify that Project Plans implement the following measures to ensure water quality BMPs are maintained:
a) The generator, fuel tank, containment areas, controls, and transfer switches should be mounted and anchored securely above the expected flood level on a concrete plaYorm inside or Prior to the
finalization of
Project plans.

City of Escalon
Engineering Staff,
Project contractor
Date: ________
Initials: _______

Page 414 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 13
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Hydrology and
Water Quality

c) i) Continued….
next to the building in a protecAve structure and shielded from wind or windborne debris. At a minimum, the generator should be placed above the main electrical service equipment and above the uAlity company pad mount transformer with
containment.
b) The locaAon of the emergency generator’s transfer switch(es), and all electrical distribuAon equipment so that the generator switches are at elevaAons that are at least as high as the generator.
c) Provide adequate access to the new generator so that related operaAng measures, chemicals, and processes are above the floodplain and accessible during storms and emergencies. d) If a fuel tank is provided on-site, provide containment and anchor tank to resist floataAon.
e) Flood-proof any chemicals, process, or operaAons for the generator within the floodplain
f) Provide an approved operaAonal plan for the Project to relocate chemicals above the floodplain in advance of a flood event.
g) Verify that the local code requirements and standards and appropriate regulaAons of the uAlity companies are
incorporated in Project plans
h) Verify that ConstrucAon Plans incorporate all local and naAonal building codes, as well as applicable electrical codes for the safety of site personnel.
i) All fuel supply and electrical lines must be protected from potenAal flooding and high wind.
j) A consistent and regularly planned maintenance program should be developed, adopted, and enforced.
k) The City Engineer shall verify that construcAon within the floodway and flood zone will occur outside of the rainy season (October 15 through April 15). AcAve construcAon within the floodway and flood zone will not occur during rain events.

BEST MANAGEMENT PRACTICES

Page 415 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 14
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Hydrology and
Water Quality

c) Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of the
course of a stream or river or through
the addition of impervious surfaces, in
a manner which would:
iv. impede or redirect flood flows?
c) iv) Continued…
BMP HYDRO-05: ConstrucAon within Riverine Floodway- Prior to Project construcAon and final approval of Project plans, the City of Escalon’s Engineering staff and San Joaquin County Flood Management Division shall verify that Project Plans and SpecificaAons contain the following measures to minimize impacts within FEMA-designated flood Zone A and AE:

1. A minimum of two (2) surveys are required; one before and one aOer construcAon. The first survey establishes the elevaAon of the project site and is compared to the BFE to determine the height above grade that flood damage reducAon measures
must be taken. Based on this iniAal survey, the “Preliminary ElevaAon CerAficate” an FM form series must be completed by a surveyor or engineer and is required prior to clearance from Public Works. If your plans/ applicaAon package does not include a completed FM-1 you cannot proceed to the
Community Development Building for a plan check (SJ SFHA Construcon Requirements);

2. All uAliAes, machinery, equipment, tanks, and wells are required to be elevated above the BFE or be designed,
constructed, and installed to prevent floodwaters from
entering or accumulaAng within its components. For addiAonal informaAon, see ASCE 24-05 Chapter 7(SJ SFHA Construcon Requirements);

3. Upon the compeAAon of daily Project acAviAes within the flood zones, the Project contractor shall ensure that debris, trash, loose branches, and vegetaAon have been removed from Lone Tree Creek or riverbanks. VegetaAon that is acAvely growing in the stream bank should not be removed without permission.

Prior to any removal of streamside vegetaAon or to report any observaAons of the clearing of vegetaAon or trees on stream banks, contact San Joaquin County Channel Maintenance
Division at 209.468.9698 (SJ Hazards in San Joaquin County); Prior to the
finalization of
Project Plans and
Specifications.

City of Escalon,
Project
contractor, San
Joaquin County
Flood
Management
Division
Date: ________
Initials: _______

Page 416 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 15
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Hydrology and
Water Quality
c) iv) Continued…

4. UAlize methods and pracAces that minimize flood damage, throughout Project construcAon (Escalon Municipal Code
Secon 17.32.130 Standards of Construcon);

5. Electrical, heaAng, venAlaAon, plumbing, and air condiAoning equipment and other service faciliAes that are designated and/or located so as to prevent water from entering or
accumulaAng within the components during condiAons of
flooding (Escalon Municipal Code Secon 17.32.130 Standards of Construcon);

6. All new and replacement water supply and sanitary systems shall be designated to minimize or eliminate infiltraAon of flood waters into the systems; and discharge from the systems into flood waters (Escalon Municipal Code Secon 17.32.150
Standards of Ulies).

See MiAgaAon Measure Modified MM HYDRO-02: SWPPP. Throughout Project construction
activities.

Project contractor
Date: ________
Initials: _______
See MiAgaAon Measure Modified MM HYDRO-03: Erosion Control. Prior to the final approval of Project
Plans and prior to
the start of
construction.

City of Escalon
Engineering Staff Date: ________
Initials: _______
e) Conflict with or obstruct
implementation of a water quality
control plan or sustainable
groundwater management plan?
MM HYDRO-02: Prevent Stormwater Pollution Throughout Project construction
activities.

Project contractor
Date: ________
Initials: _______
Land Use and
Planning

a) Physically divide an established
community?
Modified MM LAND-01: Landowner Consultation- The City of Escalon shall consult with all potentially affected landowners associated with the segments of the selected alignment that crosses farmland as part of the Prior to the start of
Project construction
The City of
Escalon, local
Landowners
Date: ________

Page 417 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 16
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Land Use and
Planning

a) Continued…
land acquisition process. As part of this acquisition process Escalon and the landowners shall negotiate an agreed-upon compensation for the loss of any existing orchard trees and/ or vines currently in production. During these consultations, Escalon shall also, in conjunction with landowners’ input, access gates. Access gate locations shall be included in the final design plans for the proposed Project. Modified MM TRAF-16: Routing Traffic Adjacent to Active Agriculture Operations provides for controlled access for vehicle traffic associated with active agricultural operations in farmland areas.
and certification of
Project Design.

Initials: _______
Modified MM LAND-02: Advance Notice- The City of Escalon shall provide a minimum 2-week advance notice of the construction activities schedule to the affected community members adjacent to construction areas (e.g., residences, property owners, business owners, and public facility operators), including the posting of signs.

Two weeks prior to
Project construction
activities.

The City of
Escalon Date: ________
Initials: _______
Modified MM LAND-03: Construction Contract Documents- The City of Escalon shall incorporate mitigation measures in construction contract documents (e.g., terms of schedule or access conditions or technical requirements). The City and its contractor(s) shall coordinate with local jurisdictions and obtain all necessary permits (e.g., encroachment permit, utility excavation permit), shall comply with permit conditions established to minimize construction impacts, and shall assign an inspector to the Project to oversee construction activities.

Prior to the
finalization of
Project construction
contract documents.

The City of
Escalon, Project
contractor
Date: ________
Initials: _______
Modified MM LAND-04: Operation of Project Components – The City of Escalon shall implement mitigation measures described in the Air Quality and Noise Section.

Throughout the
implementation of
the proposed
Project.

The City of
Escalon, Project
contractor
Date: ________
Initials: _______
Noise

a) GeneraAon of a substanAal
temporary or permanent increase
in ambient noise levels in the
vicinity of the Project in excess of
standards established in the local
general plan or noise ordinance, or
MM NOI-01: Construction Noise Attenuation1. During all Project Site excavaAon and grading, construcAon contractors shall equip all construcAon equipment, fixed or mobile, with properly operaAng and maintained mufflers, consistent with manufacturer standards.

2. The contractor shall place all staAonary construcAon equipment so that emiEed noise is directed away from the noise-sensiAve receptors nearest the project site. One-inch plywood or acousAc Throughout Project
construction.

City of Escalon,
Project contractor Date: ________
Initials: _______

Page 418 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 17
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Noise

applicable standards of other
agencies?
a) Continued…
blankets capable of achieving a reducAon level of at least 10 dB shall be used to keep equipment noise from exceeding the 80 dBA noise level standard.

3. Equipment shall be shut off and not leO to idle when not in use.

4. Whenever possible, electric power will be used instead of internal combusAon engine power.

5. The contractor shall locate equipment staging in areas that will create the greatest distance between construcAon-related noise/vibraAon sources and sensiAve receptors nearest the Project Site during all project construcAon.

6. Jackhammers, pneumaAc equipment, and all other portable staAonary noise sources shall be shielded, and noise shall be directed away from sensiAve receptors.

7. The Project proponent shall mandate that the construcAon contractor prohibit the use of music or sound amplificaAon on the Project Site during construcAon.

8. The construcAon contractor shall limit haul truck deliveries to the same hours specified for construcAon equipment.

MM NOI-02: Stationary Source NoiseOption 1
Prior to Project construction, the Project contractor and the City of Escalon shall verify with sound measurements that the 125-kW diesel generator does not exceed 82 dB at 3 feet or a sound power level of 90; along with the proposed 25 Hp with a sound pressure level of 80 dB at 3 feet (sound power level of 88) and the proposed HVAC condenser with a sound pressure level of 62 dB at 3 feet (power level of 70). See Figure 13:

BPS Operational Noise Levels.

In addition, to ensure that operational noise levels do not exceed 65 CNEL during high demand, the Project contractor and City engineers shall require (measure, confirm, and monitor during site inspections) on an ongoing basis each 50 Hp pump does not have a noise level that exceeds 64 dB at a distance of 3 feet (sound power level of 72). See Figure 13: BPS Operational Noise Levels.

Throughout Project
construction.

City of Escalon,
Project contractor Date: ________
Initials: _______

Page 419 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 18
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Noise

a) Continued…
OR
Option 2
Prior to the issuance of building and grading permits, the City of Escalon engineering department shall verify Project plans including the construction of a 10-foot-high concrete barrier along the northern edge of the pad proposed for the pumps and a 7-foot-high barrier along the eastern boundary of the Booster Pump Station. See Figure 13: BPS Operational Noise Levels.

OR
Option 3
Prior to the issuance of building and grading permits, the City of Escalon engineering department shall verify Project plans including the construction of an 8-foot-high concrete barrier along the northern boundary of the existing parking lot and a 6-foot barrier along the eastern edge of the pump area pad, parallel to Escalon-Bellota Road. Figure 13:

BPS Operational Noise Levels.

Public Services a) Result in substanAal adverse
physical impacts associated with the
provision of new or physically
altered governmental faciliAes, need
for new or physically altered
governmental faciliAes, the
construcAon of which could cause
significant environmental impacts,
in order to maintain acceptable
service raAos, response Ames, or
other performance objecAves for
any of the public services:

I. Fire ProtecAon?
II. Police ProtecAon?
III. Schools?
IV. Parks?
See Mitigation Measure Modified MM TRAF-01: Traffic Control Plan. Upon finalizing the Project plans
City of Escalon,
Licensed Traffic
Engineer
Date: ________
Initials: _______

Page 420 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 19
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
I. Schools? See Mitigation Measure Modified MM TRAF-02: Coordinate Traffic Plan with EUSD.

Prior to Project
construction
City of Escalon,
Escalon Unified
School District,
Project contractor
Date: ________
Initials: _______
Transportation

Transportation

b) Conflict or be inconsistent with CEQA
Guidelines § 15064.3, subdivision
(b)?
b) Continued…
Modified MM TRAF-01: Traffic Control Plan- Upon the finalization of a detailed pipeline alignment design, the City of Escalon shall arrange for a Traffic Control Plan to be prepared by a licensed traffic engineer, for all project-affected roadways and intersections. The Traffic Control Plan shall comply with requirements in encroachment permits issued by San Joaquin County. The Traffic Control Plan to be prepared by the construction contractors shall include, but not be limited to, the following measures:
- Maintain the maximum amount of travel lane capacity during nonconstrucAon periods, with all trenches covered with steel plates, and provide flagger control at all construcAon sites to manage traffic control.
- Limit the construcAon work zone in each block to a width that, at a minimum maintenance alternates one-way traffic flow past the construcAon zone. AlternaAvely, use detour signing on alternate access streets when temporary full streets closure is required. - Restrict construcAon to non-peak traffic periods as required for specific work sites in encroachment permits. Weekend and night work shiOs may be considered in non-residenAal areas only. - Coordinate construcAon acAviAes (Ame of year and duraAon) to minimize traffic disturbances adjacent to commercial areas (e.g., avoid the peak of Christmas, and holiday shopping period), dairies, and the Atlanta Cemetery.
- Post advanced warnings of construcAon acAviAes(e.g., signs, arAcles in newspapers, noAces on radio/TV, etc.) to allow motorists to select alternaAve routes in advance.

Upon finalizing the
Project plans
City of Escalon,
Licensed Traffic
Engineer
Date: ________
Initials: _______
d) Result in inadequate emergency
access?
Modified MM TRAF-02: Coordinate Traffic Plan with EUSD - Prior to Project construction, the City of Escalon shall develop comprehensive strategies for maintaining emergency access for sensitive land uses such Prior to Project
construction
City of Escalon,
Escalon Unified Date: ________

Page 421 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 20
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Transportation

D) ConAnued…
as Escalon police and fire stations, and Escalon Unified School District in consultation with the facility owner or administer, as part of the Traffic Control Plan for roadway segments and intersections. Strategies shall include but are not limited to, maintaining steel trench plates at the construction sites to restore access across open trenches, parking of fire trucks outside the firehouse on the side of the street opposite the construction during affected work hours, and identification of alternate routing around construction zones. Also, police, fire, and other emergency service providers shall be notified of the timing location, and duration of construction activities throughout the project, and the location of detours and lane closures. In addition, the Project contractor must share the traffic control plan with the Escalon Unified School District to coordinate best management practices during peak operational hours (pickup and drop-offs) at Escalon High School.

School District,
Project contractor
Initials: _______
Modified MM TRAF-03: Advanced Notice- Prior to construction activities along the Project alignment and at the site of the FCF, and BPS, the City of Escalon shall require a minimum 72-hour advance notice of access restrictions for residents and businesses. Affected residents and businesses shall be advised of the requirements for moving motor vehicles out of the area to be closed.

Prior to construction
activities along the
Project alignment
and site of FCF and
BPS
City of Escalon
Date: ________
Initials: _______
Modified MM TRAF-04: Off-Street Construction Parking- During construction activities, the City of Escalon may require the contractor(s) to provide off-street parking for construction worker’s vehicles in the vicinity of the work zone, or workers may be shuttled to the work from an off-site location.

During construction
activities
City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______
Modified MM TRAF-05: Warning Signs- As part of the Traffic Control Plan(s) for roadway segments and intersections, the City of Escalon shall ensure that such plans stress advance “Road Work Ahead” warning signs and speed control (including signs informing drivers of State-legislation double fines for speed infractions in a construction zone) to achieve required speed reductions for safe traffic flow through the work zone.

During construction
activities
City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______

Page 422 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 21
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Modified MM TRAF-06: Bicyclists and Pedestrians- Prior to construction activities, the City of Escalon shall incorporate into contract specifications for all project components that require that traffic control plans include detours for bicyclists and pedestrians in all areas potentially affected by project construction.

Prior to Project
construction
City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______
Modified MM TRAF-07: Encroachment Permit- Before the approval of Project plans, the City of Escalon shall obtain encroachment permits from affected jurisdictions before construction of the project, and comply with haul route designations, and roadway wear monitoring and repairs conditions.

Prior to Project
construction
City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______
Tribal Cultural
Resources

a) Would the Project cause a
substantial adverse change in the
significance of a tribal cultural resource,
defined in Public Resources Code §
21074 as either a site, feature, place,
cultural landscape that is
geographically defined in terms of the
size and scope of the landscape, sacred
place, or object with cultural value to a
California Native American tribe, and
that is:
i. Listed or eligible for lisAng in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in
Public Resources Code secAon
5020.1(k), or
ii. A resource determined by the lead
agency, in its discreAon and
supported by substanAal evidence,
to be significant pursuant to
criteria set forth in subdivision (c)
MM TRI-01: Agreements, ConsulAng, and Monitoring with Affiliated Tribes. Prior to the issuance of grading or building permits, the City of Escalon shall secure agreements with ConsulAng Tribes for monitoring.

The City will be required to provide 30 days’ advanced noAce to the tribes of all ground-disturbing acAviAes. The NaAve American Tribal RepresentaAves shall have the authority to temporarily halt and redirect earth-moving acAviAes in the affected area if suspected tribal resources are unearthed. The NaAve American Monitor(s) shall aEend the preconstrucAon crew training with the Project Archaeologist, City, the construcAon manager, and any contractors pursuant to Modified MM CUL-01: (Ground InspecAon) Pre-ConstrucAon Crew Training. The training will include a Tribal PerspecAve of the mandatory Cultural Resources Worker SensiAvity Training for those in aEendance.

Prior to the issuance
of grading or
building permits
City of Escalon,
Consulting Tribes Date: ________
Initials: _______
MM TRI-02: Diversity of Buried Tribal Cultural Resources. If sub-surface cultural resources are discovered during ground-disturbing acAviAes (inadvertent discoveries), the following shall be carried out for final disposiAon of the discoveries:

1. PreservaAon-in-Place: The cultural resource shall be preserved in place by the Project contractor if possible. PreservaAon-inPlace means avoiding the resources and leaving them in place where they were found with no development affecAng the
integrity of the resources. All work around the inadvertent In the event,
subsurface cultural
resources were
discovered during
ground-disturbing
activities.

City of Escalon,
Project
contractor,
Project
archeologist or
representative
from a Consulting
Tribe
Date: ________
Initials: _______

Page 423 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 22
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Tribal Cultural
Resources
of Public Resources Code § 5024.1.

In applying the criteria set forth in
subdivision (c) of Public Resource
Code § 5024.1, the lead agency
shall consider the significance of
the resource to a California NaAve
American tribe.
a) i) &ii) ConAnued…
discoveries shall be halted unAl the Project archeologist or representaAve from a ConsulAng Tribe is noAfied and onsite for retrieval.

2. NoAfy ConsulAng Tribes: Prior to the reburial or resuming construcAon acAviAes, tribes must be noAfied immediately by the District regarding the treatment and disposiAon of arAfacts.

3. Reburial: Onsite reburial of the discovered items shall be reburied; and the reburial area shall be protected from any future impacts in perpetuity. Reburial shall not occur unAl all legally required cataloging and basic recordaAon have been completed. No recordaAon of sacred items is permiEed
without the wriEen consent of all ConsulAng Tribes. The locaAon for the future reburial area shall be idenAfied on a confidenAal exhibit on file with the City and concurred to by the ConsulAng Tribes prior to cerAficaAon of the environmental document.

SC TRI-01: AB 52: Prior to Project construction, the City of Escalon shall complete coordination with the local tribes pursuant to AB 52. If a response has not been received within two weeks of notification, the City of Escalon might follow up with a telephone call or email to ensure that the Project information has been received and reviewed by each respective tribe.

Prior to Project
construction
City of Escalon,
Consulting Tribes Date: ________
Initials: _______
Utilities and
Services

a) Require or result in the relocaAon
or construcAon of new or
expanded water, wastewater
treatment or storm water
drainage, electric power, natural
gas, or telecommunicaAons
faciliAes, the construcAon or
relocaAon of which could cause
significant environmental effects?
Modified MM UTL-01- Existing Utilities- A detailed study identifying utilities within areas subject to earthwork with the Project construction shall be conducted during the pre-design stages of the Project. For project components with utility conflicts, the following mitigations are identified:
- UAlity excavaAon or encroachment permits shall be required from the appropriate agencies. These permits include
measures to minimize uAlity disrupAon. The City and its contractors shall comply with permit condiAons, and such condiAons shall be included in construcAon contract
specificaAons.

Prior to Project
construction and
throughout Project
construction.

City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______

Page 424 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 23
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials

Utilities and
Services a) Continued…
- UAlity locaAons shall be verified through field survey (potholing) and use of the Underground Service Alert (USA) services.
- Detailed specificaAons shall be prepared as part of the design plans to include procedures for the excavaAon, support, and fill of areas around uAlity cables and pipes. All affected uAlity services shall be noAfied of the City’s construcAon plans and schedule. Arrangements may be made with these enAAes
regarding protecAon, relocaAon, or temporary disconnecAon of services.
- The City shall employ special construcAon techniques in areas where the water transmission pipeline is located parallel to wastewater pipelines. These special measures, which shall be included in the engineering specificaAons, may include trench wall-support measures to guard against trench wall failure and possible resulAng loss of structural support for the water pipeline.
- Residents and businesses in the project area shall be noAfied of planned uAlity service disrupAon two to four days in advance, in conformance with county and state standards.

Modified MM UTL-02: Utility Conflicts- In order to reduce potential impacts associated with utility conflicts, the following measures shall be implemented in conjunction with Modified MM UTL-01- Existing Utilities:

- Disconnected cables and lines shall be reconnected promptly - Based on the uAliAes invesAgaAon to be conducted by the City of Escalon shall consult with any enAAes having uAlity conflicts with the proposed project to negoAate relocaAon efforts or other plans to resolve the conflict.
- The City of Escalon shall observe DHS standards Waterworks Standards found in the Cal. Code Regs. chapter 16 et. seq. and are under the authority of the State Water Resources Control Board, Division of Drinking Water which require: 1) a 10-foot horizontal separaAon between parallel sewer and water
pipelines (gravity or force pipelines); 2) 1-foot verAcal Prior to Project
construction and
throughout Project
construction.

City of Escalon,
Project
contractor(s)
Date: ________
Initials: _______

Page 425 of 440 ends

FINAL MITIGATION MONITORING AND REPORTING PROGRAM - STATE CLEARINGHOUSE NO. SCH 2024090184

CITY OF ESCALON CONNECTION TO NICK DEGROOT WATER TREATMENT PLANT PROJECT

ESCALON, SAN JOAQUIN COUNTY, CA
OCTOBER 2024
CITY OF ESCALON PAGE 24
Issue Potentially Significant Impact reduced
to Less than Significant Impact
Recommended Mitigation Measure Timing Responsible Party Date Completed and Initials
separaAon between perpendicular water and sewer line
crossings (in the event that separaAon requirements may not be maintained, the City shall obtain DHS State Water Resources Control Board, Division of Drinking Water variance through provisions of sewer encasement, or other means deemed
suitable by DHS State Water Resources Control Board, Division of Drinking Water); and 3) encasing water pipelines in
protecAve sleeves where the pipeline crosses under or over an exisAng wastewater pipeline.

Wildfire a) SubstanAally impair an adopted
emergency response plan or
emergency evacuaAon plan?
See Mitigation Measure Modified MM TRAF-01: Traffic Control Plan. Upon finalizing the Project plans
City of Escalon,
Licensed Traffic
Engineer
Date: ________
Initials: _______
See Mitigation Measure Modified MM TRAF-02: Coordinate Traffic Plan with EUSD.

Prior to Project
construction
City of Escalon,
Escalon Unified
School District,
Project contractor
Date: ________
Initials: _______

Page 426 of 440 ends

ITEM NO. 8

COUNCIL AGENDA ITEM
FOR OCTOBER 21, 2024
Prepared By: Jaylen French, Interim City Manager
Date: October 14, 2024
Subject: Agenda Item Request – City Councilmembers
Recommendation:

Discuss and provide direction on the Agenda Item Request from City Councilmember Strohman and Mayor Pro Tem Hagan to identify a prioritized list of programs/equipment to be submitted to the San Joaquin County District Attorney as part of the City of Escalon application for Asset Forfeiture funds.

Background and Discussion:

On June 17, 2024, Councilmember Strohman expressed desire to apply for up to $25,000 in San Joaquin County District Attorney (SJCDA). Asset Forfeiture Funds to support programs such as the Healthy Room Project and other programs/efforts and/or equipment for the youth of Escalon. Mayor Pro Tem Hagan supported bringing an item before the council to identify the preferred use of the funds to be compiled in an application and submitted to SJCDA with the hope of receiving said funds.

On July 15, 2024, the City Council discussed the matter and requested additional information on applicable uses of the identified funds. Additional information, obtained from the San Joaquin County District Attorney’s Office and from the Health and Safety Code §11489(a)(2)(A)(i), is provided below.

Fifteen percent (15%) of the funds distributed pursuant to this subparagraph shall be deposited in a special fund maintained by the county, city, or city and county of any agency making the seizure or seeking an order for forfeiture. This fund shall be used for the sole purpose of funding programs designed to combat drug abuse and divert gang activity, and shall wherever possible involve educators, parents, community-based organizations and local businesses, and uniformed law enforcement officers. Those programs that have been evaluated as successful shall be given priority. These funds shall not be used to supplant any state or local funds that would, in the absence of this clause, otherwise be made available to the programs.

It is the intent of the Legislature to cause the development and continuation of positive intervention programs for high-risk elementary and secondary school age students. Local law

Page 427 of 440 ends

enforcement should work in partnership with state and local agencies and the private sector in administering these programs.

The actual distribution of funds set aside is to be determined by a panel consisting of the sheriff of the county, a police chief selected by the other chiefs in the county, and the district attorney and the chief probation officer of the county.

The DA’s Office further shared that within their procedures, an initial eligibility determination is made by the Chief Deputy District Attorney. Then, any request is forwarded to an established panel that consists of District Attorney Ron Freitas, Sheriff Pat Withrow, Tracy Police Sekou Millington and Chief of Probation Steven Jackson. If approved, the fiscal department within the DA’s Office will arrange payment from the County Auditor and a ceremonial check presentation with Mr. Freitas is scheduled.

On August 5, 2024, City staff presented various options for Council’s consideration (as shown below). The Council discussed the various options, some which were agreeable and some which were not. Ultimately, the Council reached consensus to survey (including the desired options from below) the students in the School District to gauge what programming they would prefer to have available.

Potential Ideas Previously Raised during Council Discussions or Provided by Staff The Healthy Room Project (https://thehealthyroomproject.org/home). The Healthy Room Project was established to address the detrimental effects of dangerous living conditions and inadequate spaces on the well-being and development of underprivileged children, especially from single-parent households, by collaborating with local police officers and others to execute a one-day initiative to revamp children’s bedrooms, providing essential furnishings such as a new bed, desk, dresser, lamp, bedding, and freshly painted walls.

Sports Equipment Assistance. Help fund the necessary sports equipment purchases for those participating in Escalon recreational sports that cannot afford the equipment.

City-Owned Chromebook Laptops. To be used for non-sport youth programs/trainings at the Community Center by an approved trainer or business. Further, the laptops could be stored at and managed by the Escalon Library, with Library approval, to be available for youth when not in use for programs/trainings.

Teen Excursions / Events. Locate a provider and fund/help fund excursions and/or events for teens.

For example, a trip to a professional sporting event, camping, or state park, etc. Or help fund events at the community center. For example, karaoke events, murder mysteries, scavenger hunts, talent shows, etc.

Non-Sport Programming. Locate a provider and fund/help fund non-sport programming.

On September 9, 2024, EUSD released a four question survey to students to gather input on the youth activities they desire most. The survey closed on September 20th. 406 survey responses were received. When asked to select two activity types:

Page 428 of 440 ends

- 70% of respondents indicated they desired to see teen excursions or events, such as trips to sporting events, state parks, karaoke or scavenger hunts. - 48% desired to see after-school activities such as clubs, recreation or educational activities. - 22% preferred non-sport activities such as STEM, art or music, and - 15% preferred technology programs such as coding or robotics.

In establishing the priority list of programming as part of the San Joaquin County District Attorney’s Asset Forfeiture Grant application, should the Council desire to follow the results of the survey, City staff recommends identifying and partnering with a youth group, like the Boys and Girls Club to implement an excursion or after-school program, as these groups are currently equipped to provide this type of programming or have existing program that can be leveraged to include more students.

The Escalon Unified School District has an established partnership with the Boys and Girls Club and therefore, City staff would work with them to provide a portion of the grant funding to carry out an excursion/event for the youth of Escalon.

City staff recommends requesting $25,000 in total funding from the San Joaquin County District Attorney’s Asset Forfeiture Grant program, and utilized in three program/activities as follows:
- $8,000 for the Healthy Room Project. This funding would provide the City an opportunity to complete four (4) room renovations per year, including all material costs and associated incidentals.
- $12,000 for youth excursion(s). This funding would be provided to the Boys and Girls Club, through their partnership with the Escalon Unified School District, or another entity to provide the youth excursion.
- $5,000 for after school activities. This funding would be provided to the Escalon Unified School District, the Boys and Girls Club, the Escalon Library or another entity to administer the after school activities.

Fiscal Impact:

There is not expected to be a negative fiscal impact to the City as part of this grant program.

Page 429 of 440 ends

ITEM NO. 9

COUNCIL AGENDA ITEM
FOR OCTOBER 21, 2024
Prepared By: Jaylen French, Interim City Manager
Date: October 14, 2024
Subject: Consider Agenda Item Request from Mayor Pro Tem Hagan and Councilmember Walker Regarding Proposed Approach for Escalon Baseball/Softball Program
Recommendation:

Consider Agenda Item Request from Mayor Pro Tem Hagan and Councilmember Walker Regarding Approach for Escalon Baseball/Softball Program.

Background and Discussion:

A new concept or approach for the Escalon recreation Baseball/Softball league has been brought forward for consideration. This concept was initially introduced at the July 10, 2024 Escalon Recreation Commission meeting. At that time, the proposers, Mayor Pro Tem Hagan and Councilmember Walker, in coordination with a proposed partner, Todd Davis, presented the concept to the Recreation Commission.

In summary, the concept:
- Proposes to join the league Stanislaus County League, as opposed to the Oakdale Baseball Softball League
o Escalon would play teams from: Hart Ransom, Modesto Christian, Hughson, Red Shield, Westport, Shilo Paradise, Eisenhut and others.
- Administration of the league (registration, scheduling, jersey ordering, etc.) would be handled through a contract with Todd Davis and an established external Board OR remain with the City of Escalon.
o The Board could be comprised of volunteer parents, recreation staff, and recreation commissioners
- Proposes to offer formal coaches clinics, a coach’s guidebook and ongoing coach support - Proposes to offer child skills clinics by Todd Davis and Escalon High School staff - Could include formal travel ball opportunities after the recreation season or remain as is - Would offer greater control over league rules
The Recreation Commission had questions regarding the proposal. Those questions, summarized, are below.

Page 430 of 440 ends

- What would be the cost of the revised approach/program? - Define the nature of Todd Davis’ role in the program? - What would the travel look like in the new league?
- What would be the make up of the Board?
This item was subsequently presented to the Recreation Commission at the August 7, 2024 meeting.

At that meeting, the questions issued in the July meeting were answered as provided below. - The ultimate cost of the program would be determined upon execution of the concept, and would depend on many factors, including type of umpire utilized, quality of jersey and hat, what equipment or uniform is included, the level of off-season support by the contractor, any fundraising or subsidy by outside entity, etc. It should be noted that the cost of the current program is more than the City recuperates through registration fees and sponsorships and therefore, the cost of the program could be increased compared to current levels. - Todd would serve as the league representative to the larger Stanislaus County League Board, would sit on the Escalon League Board, would be a key administrator of the program, and would provide the coaching and athlete skills clinics.
- Travel would increase for the older age divisions, and would include trips to Hart Ransom, Modesto Christian, Hughson, Red Shield, Westport, Shilo Paradise and Eisenhut, amongst others potentially.
- The Board is currently proposed to be comprised of volunteer parents, recreation staff, and recreation commissioners, but could be established with a different composition, depending on the will of the City Council or community.

This concept was subsequently presented to the public at a workshop held on September 11, 2024, in which nearly 30 people attended. The presentation and questions from prior meetings were provided to those in attendance. Mayor Pro Tem Hagan and Todd Davis provided an outline of the proposal and how it would work and how it would address some of the issues currently experienced in the current program. Todd Davis then answered the questions of the public. Many of the same questions and topics were raised. Other questions were also raised as outlined below.

Q: Who/what would be responsible for the concerns/complaints expressed by parents? A: The Board
Q: How would this proposal address the shortage of coach issue? A: The Stanislaus County League works with coaches or would be coaches to ensure there is an adequate number.

Q: Has this been coordinated with the High School and will they be involved? A: Yes.

Q: Would this allow an opportunity to not merge age groups? A: Yes.

Page 431 of 440 ends

Q: How would children who cannot afford an increase be impacted? A: It was stated that a non-profit (Escalon Strong or others) could help subsidize those costs for those in need. It was also stated that fundraising options could be explored.

Q: Would travel ball component be parent coached?
A: Travel ball would be coached by Todd Davis or a coach would be hand-selected.

Q: Does field availability impact the league approach?
A: It should not.

On October 2, 2024, this item was presented to the Escalon Recreation Commission. There was significant public comment and suggestions regarding the concept. The major themes/concerns/questions were as follows:
- Should the travel component of the concept be a separate consideration? - Should the contractor (Todd Davis) and an external board administer the program or the City of Escalon?
- Desire for a clearer picture on the role of the contractor (Todd Davis).

Ultimately, the Recreation Commission recommended the concept be forwarded to the Escalon City Council for consideration.

For Council’s consideration, the following is information on the three themes/concerns/questions from the October 2nd Recreation Commission meeting.
- Who (what entity) administers the program?
Excerpt from Exhibit A (attached):

To ease the minds of apprehensive families; this is not a 3rd party takeover of our recreation baseball and softball from the City of Escalon. This restructuring will be a supportive and benevolent addition to our current approach like many cities have done in years prior. This would target the 9/10u division and above, unless the newly created board wanted to change this approach in the future to modify the age groupings. This means the 8U and younger kids would stay in the current format without going out of town, with the exception of some rule modifications potentially, and the addition of skills camps and coach camps, and upgraded coaching support.
- Cost of Program and Associated Benefits?
Excerpt from Exhibit A (attached):

No kids will be left behind as the nonprofit Escalon Strong is committed to helping to fund these children through fundraising, donations, and running the Snack bar. The nonprofit has provided to date L-screens, pitching machines, hundreds of new baseballs and softballs, a batting cage, and even played a big role in securing the funds for the new homerun fences. They are committed to help next season where the league needs the help, including new mounds and drag nets to come.

Paraphrase of Exhibit A

Page 432 of 440 ends

o Improved communication between parents and league, and provide opportunity for direct input o Improved practice and game scheduling
o Improved coaching support and materials
o Provide league wide coaching philosophy
o Provide skills camps for children
o Provide coaching clinics
o Improved draft model
- Schedule and Scope of Work of Todd Davies
Excerpt from Exhibit A
November
- Retrofit website or launch a new one.
- Open registration
- Setup bank for funds or not depending on city
- Elect board
- This could all stay with the city if desired, but Todd Davis could facilitate - Join County league and start attending meetings
December
- Equipment needed baseballs who what where
- Sponsors for fields and fundraising
- Sizing dates set (normally 2 or 3 events for kids to try on uniforms (at park or maybe Dicks Sporting Goods)
- Determine cap on teams, i.e. what teams join country league 9/10 and up - Workout 1 – hitting, throwing, catching (offering two camps for 9/10 with 11/12 and 13/14 by itself).

And then repeat for softball same day or another weekend.

January
- Coach’s meeting
- Coaches camp or discussion on how to run each age group - Camp 2 with all the coaches included
- Who will do uniforms and hats what do we offer and what price point - Uniform sponsorship each coach needs one
- Order uniforms end of month insure they will be ready on opening day

February
- Close registration and finalize teams
- Field day prep
- Scout fields and options
- Assign coaches
- Set practice schedule
- Start scheduling games and umpires
- Save money on umps by using kids from high school
- Create umpire list of people available
- Set infrastructure for backup coaches and umpires
March

Page 433 of 440 ends

- Opening day
- Raffle baskets from teams and sponsorship
- Games / Makeup games
- Rainouts
- Promotions and swag gear
Fiscal Impact:

Depending on if the concept is approved and then the direction approved, the concept could have a significant or no impact to the City’s General Fund.

Attachments:

Exhibit A – Letter from Todd Davis and Councilmembers Hagan and Walker

Page 434 of 440 ends
Page 435 of 440 ends
Page 436 of 440 ends
Page 437 of 440 ends
Page 438 of 440 ends

ITEM NO. 10

COUNCIL AGENDA ITEM
FOR OCTOBER 21, 2024
Prepared By: Jaylen French, City Manager
Date: October 14, 2024
Subject: Consider designating Baseball Field B at Hogan-Ennis Park as Greg Largent Field
Recommendation:

Consider designating Baseball Field B at Hogan-Ennis Park as Greg Largent Field.

Background and Discussion:

At the September 16, 2024 Escalon City Council meeting, Mayor Pro Tem Hagan suggested renaming Baseball Field B to Greg Largent Field in honor of the longtime, and highly successful Escalon High School Baseball Coach. This was supported by Councilmember Engle.

Mayor Pro Tem Hagan received verbal approval from the Hogan Family. If the name change is approved by the City Council, a plaque would be made, similar to the sign installed at Sketti Field in 2019, and installed on the backstop. Further, the City would coordinate with others to host a ceremony for the field dedication.

Fiscal Impact:

The approval of the Field name change is expected to have minimal fiscal impact.

Attachments

1. Resolution xx-24

Page 439 of 440 ends

RESOLUTION NO. xx-24

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ESCALON

RENAMING BASEBALL FIELD B AT HOGAN-ENNIS PARK TO GREG LARGENT FIELD
WHEREAS, an Agenda Request Item was initiated by Mayor Pro Tem Hagan, and supported by Councilmember Engle to rename Baseball Field B at the Hogan-Ennis Park to Greg Largent Field; and
WHEREAS, Mayor Pro Tem Hagan received a letter of approval of the proposed name change from the Hogan Family; and
WHEREAS, the City of Escalon maintains an informal process to name or dedicate a facility or space within the City, which consists of approval of the majority of the City Council, stemming from a request for said name change by the public, the Council or another entity; and WHEREAS, in 2019, the Escalon City Council approved the name change and dedication of Field A at the Hogan-Ennis Field to Sketti Field.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Escalon that:

SECTION 1. The City Council does hereby approve the name change of Field B at the Hogan-Ennis Park to Greg Largent Field.

PASSED, ADOPTED AND APPROVED by the City Council of the City of Escalon at a regular meeting held this 21st day of October, 2024 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
________________________
DAVID BELLINGER, Mayor
ATTEST:
________________________
JAYLEN FRENCH, City Clerk

Page 440 of 440 ends