City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-672-140 1782 PISTACIA CT
Single-Family
Residential 13.31 451.54 431.76
0167-672-150 1786 PISTACIA CT
Single-Family
Residential 15.42 523.19 500.28
0167-672-160 1790 PISTACIA CT
Single-Family
Residential 13.06 443.07 423.66
0167-672-170 No Benefit 0.00 0.00 0.00
0167-672-180 1781 PISTACIA CT
Single-Family
Residential 13.77 467.14 446.68
0167-672-190 1777 PISTACIA CT
Single-Family
Residential 13.91 471.95 451.26
0167-672-200 1773 PISTACIA CT
Single-Family
Residential 13.12 444.96 425.46
0167-672-210 1769 PISTACIA CT
Single-Family
Residential 12.77 433.25 414.28
0167-672-220 1765 PISTACIA CT
Single-Family
Residential 13.12 444.91 425.40
0167-672-230 1761 PISTACIA CT
Single-Family
Residential 13.68 464.19 443.86
0167-691-020 No Benefit 0.00 0.00 0.00
0167-701-010 No Benefit 0.00 0.00 0.00
0167-710-010 801 WALDEN CT
Single-Family
Residential 9.84 333.89 319.26
0167-710-020 805 WALDEN CT
Single-Family
Residential 10.13 343.56 328.50
0167-710-030 809 WALDEN CT
Single-Family
Residential 9.21 312.61 298.92
0167-710-040 813 WALDEN CT
Single-Family
Residential 9.46 321.04 306.98
0167-710-050 817 WALDEN CT
Single-Family
Residential 12.82 434.75 415.70
0167-710-060 821 WALDEN CT
Single-Family
Residential 12.02 407.64 389.78
0167-710-070 825 WALDEN CT
Single-Family
Residential 11.22 380.47 363.80
0167-710-080 829 WALDEN CT
Single-Family
Residential 11.04 374.45 358.04
0167-710-090 833 WALDEN CT
Single-Family
Residential 11.31 383.67 366.86
0167-710-100 837 WALDEN CT
Single-Family
Residential 10.32 350.18 334.84
0167-710-110 841 WALDEN CT
Single-Family
Residential 10.96 371.96 355.66
0167-710-120 845 WALDEN CT
Single-Family
Residential 10.37 351.85 336.42
0167-710-130 849 WALDEN CT
Single-Family
Residential 10.60 359.60 343.84
0167-710-140 853 WALDEN CT
Single-Family
Residential 11.01 373.41 357.04
0167-710-150 857 WALDEN CT
Single-Family
Residential 10.91 370.04 353.82
0167-710-160 861 WALDEN CT
Single-Family
Residential 11.15 378.16 361.58
0167-710-170 865 WALDEN CT
Single-Family
Residential 10.31 349.89 334.56
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 26 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-710-180 869 WALDEN CT
Single-Family
Residential 10.59 359.32 343.58
0167-710-190 873 WALDEN CT
Single-Family
Residential 10.42 353.52 338.02
0167-710-200 877 WALDEN CT
Single-Family
Residential 10.16 344.54 329.44
0167-710-210 891 WALDEN CT
Single-Family
Residential 10.72 363.78 347.84
0167-710-220 895 WALDEN CT
Single-Family
Residential 10.46 354.70 339.16
0167-710-230 899 WALDEN CT
Single-Family
Residential 11.75 398.57 381.10
0167-710-240 903 WALDEN CT
Single-Family
Residential 11.15 378.30 361.72
0167-710-250 907 WALDEN CT
Single-Family
Residential 10.00 339.22 324.36
0167-710-260 911 WALDEN CT
Single-Family
Residential 10.74 364.41 348.44
0167-710-270 915 WALDEN CT
Single-Family
Residential 9.97 338.13 323.32
0167-710-280 870 WALDEN CT
Single-Family
Residential 11.78 399.45 381.96
0167-710-290 866 WALDEN CT
Single-Family
Residential 9.56 324.34 310.12
0167-710-300 862 WALDEN CT
Single-Family
Residential 10.46 354.84 339.28
0167-710-310 858 WALDEN CT
Single-Family
Residential 9.83 333.61 319.00
0167-710-320 854 WALDEN CT
Single-Family
Residential 9.63 326.67 312.34
0167-710-330 850 WALDEN CT
Single-Family
Residential 9.14 310.23 296.62
0167-710-340 846 WALDEN CT
Single-Family
Residential 10.21 346.30 331.12
0167-710-350 842 WALDEN CT
Single-Family
Residential 9.90 335.82 321.10
0167-710-360 808 WALDEN CT
Single-Family
Residential 9.53 323.27 309.10
0167-710-370 804 WALDEN CT
Single-Family
Residential 9.34 316.79 302.92
0167-710-380 4385 THE MASTERS DR
Single-Family
Residential 10.31 349.79 334.46
0167-710-390 4381 THE MASTERS DR
Single-Family
Residential 9.64 326.90 312.56
0167-710-400 4377 THE MASTERS DR
Single-Family
Residential 9.35 317.10 303.20
0167-710-410 4373 THE MASTERS DR
Single-Family
Residential 8.98 304.82 291.46
0167-710-420 4369 THE MASTERS DR
Single-Family
Residential 9.56 324.47 310.26
0167-710-430 4365 THE MASTERS DR
Single-Family
Residential 10.24 347.36 332.14
0167-710-440 4361 THE MASTERS DR
Single-Family
Residential 9.80 332.64 318.06
0167-710-450 4357 THE MASTERS DR
Single-Family
Residential 9.40 318.78 304.80
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 27 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-710-460 4353 THE MASTERS DR
Single-Family
Residential 9.98 338.66 323.82
0167-710-470 No Benefit 0.00 0.00 0.00
0167-710-480 4349 THE MASTERS DR
Single-Family
Residential 13.42 455.29 435.36
0167-710-490 No Benefit 0.00 0.00 0.00
0167-721-010 No Benefit 0.00 0.00 0.00
0167-721-020 762 LEESBURG CT
Single-Family
Residential 10.72 363.55 347.62
0167-721-030 766 LEESBURG CT
Single-Family
Residential 9.87 334.77 320.10
0167-721-040 770 LEESBURG CT
Single-Family
Residential 9.74 330.52 316.04
0167-721-050 774 LEESBURG CT
Single-Family
Residential 10.47 355.07 339.50
0167-721-060 773 LEESBURG CT
Single-Family
Residential 10.74 364.44 348.46
0167-721-070 769 LEESBURG CT
Single-Family
Residential 10.31 349.78 334.46
0167-721-080 765 LEESBURG CT
Single-Family
Residential 9.99 338.82 323.98
0167-721-090 772 MONTECITO CT
Single-Family
Residential 10.70 362.96 347.06
0167-721-100 776 MONTECITO CT
Single-Family
Residential 9.44 320.28 306.26
0167-721-110 780 MONTECITO CT
Single-Family
Residential 9.19 311.72 298.06
0167-721-120 787 MONTECITO CT
Single-Family
Residential 11.52 390.77 373.64
0167-721-130 783 MONTECITO CT
Single-Family
Residential 10.50 356.24 340.62
0167-721-140 779 MONTECITO CT
Single-Family
Residential 10.09 342.39 327.38
0167-721-150 775 MONTECITO CT
Single-Family
Residential 10.27 348.35 333.08
0167-721-160 771 MONTECITO CT
Single-Family
Residential 11.18 379.15 362.54
0167-721-170 767 MONTECITO CT
Single-Family
Residential 11.00 373.01 356.66
0167-721-180 763 MONTECITO CT
Single-Family
Residential 10.11 342.86 327.84
0167-721-190 803 WILMINGTON CT
Single-Family
Residential 9.89 335.36 320.66
0167-721-200 805 WILMINGTON CT
Single-Family
Residential 10.21 346.32 331.14
0167-721-210 814 WILMINGTON CT
Single-Family
Residential 10.38 352.10 336.68
0167-721-220 810 WILMINGTON CT
Single-Family
Residential 9.58 325.11 310.86
0167-721-230 806 WILMINGTON CT
Single-Family
Residential 9.41 319.37 305.38
0167-721-240 802 WILMINGTON CT
Single-Family
Residential 10.16 344.73 329.62
0167-721-250 No Benefit 0.00 0.00 0.00
0167-722-010 No Benefit 0.00 0.00 0.00
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 28 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-722-020 No Benefit 0.00 0.00 0.00
0167-722-030 No Benefit 0.00 0.00 0.00
0167-771-010 1065 WINTERWOOD DR
Single-Family
Residential 13.78 467.45 446.96
0167-771-020 1061 WINTERWOOD DR
Single-Family
Residential 12.55 425.61 406.96
0167-771-030 1057 WINTERWOOD DR
Single-Family
Residential 13.20 447.66 428.04
0167-771-040 1053 WINTERWOOD DR
Single-Family
Residential 14.69 498.32 476.50
0167-771-050 1049 WINTERWOOD DR
Single-Family
Residential 13.71 465.01 444.64
0167-771-060 1045 WINTERWOOD DR
Single-Family
Residential 11.93 404.80 387.06
0167-771-070 1006 WESTCHESTER CT
Single-Family
Residential 13.58 460.60 440.42
0167-771-080 1010 WESTCHESTER CT
Single-Family
Residential 13.93 472.58 451.88
0167-771-090 1014 WESTCHESTER CT
Single-Family
Residential 13.40 454.44 434.52
0167-771-100 1018 WESTCHESTER CT
Single-Family
Residential 15.09 511.98 489.56
0167-771-110 1022 WESTCHESTER CT
Single-Family
Residential 17.70 600.45 574.16
0167-771-120 1021 WESTCHESTER CT
Single-Family
Residential 18.36 622.61 595.34
0167-771-130 1013 WESTCHESTER CT
Single-Family
Residential 14.62 495.97 474.24
0167-771-140 1009 WESTCHESTER CT
Single-Family
Residential 12.67 429.88 411.04
0167-771-150 1005 WESTCHESTER CT
Single-Family
Residential 14.15 479.98 458.96
0167-772-010 4508 AVONDALE CIR
Single-Family
Residential 14.26 483.59 462.40
0167-772-020 4500 AVONDALE CIR
Single-Family
Residential 14.65 497.02 475.24
0167-772-030 4496 AVONDALE CIR
Single-Family
Residential 15.54 526.97 503.88
0167-772-040 4488 AVONDALE CIR
Single-Family
Residential 14.11 478.53 457.56
0167-772-050 4480 AVONDALE CIR
Single-Family
Residential 14.11 478.53 457.56
0167-772-060 1042 WINTERWOOD DR
Single-Family
Residential 11.96 405.70 387.92
0167-772-070 1046 WINTERWOOD DR
Single-Family
Residential 13.30 451.15 431.38
0167-772-080 1050 WINTERWOOD DR
Single-Family
Residential 14.58 494.72 473.04
0167-772-090 1054 WINTERWOOD DR
Single-Family
Residential 14.50 491.88 470.32
0167-772-100 1058 WINTERWOOD DR
Single-Family
Residential 13.48 457.27 437.24
0167-772-110 1062 WINTERWOOD DR
Single-Family
Residential 13.37 453.42 433.54
0167-772-120 1066 WINTERWOOD DR
Single-Family
Residential 16.04 543.97 520.14
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 29 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-773-010 4453 AVONDALE CIR
Single-Family
Residential 14.36 486.94 465.60
0167-773-020 4457 AVONDALE CIR
Single-Family
Residential 13.57 460.24 440.08
0167-773-030 4461 AVONDALE CIR
Single-Family
Residential 12.82 434.98 415.92
0167-773-040 4465 AVONDALE CIR
Single-Family
Residential 14.39 488.12 466.74
0167-773-050 4469 AVONDALE CIR
Single-Family
Residential 15.70 532.40 509.08
0167-773-060 4473 AVONDALE CIR
Single-Family
Residential 13.30 451.15 431.38
0167-773-070 4477 AVONDALE CIR
Single-Family
Residential 14.58 494.61 472.94
0167-773-080 4481 AVONDALE CIR
Single-Family
Residential 12.77 433.25 414.28
0167-773-090 4493 AVONDALE CIR
Single-Family
Residential 14.00 475.02 454.20
0167-773-100 4497 AVONDALE CIR
Single-Family
Residential 12.27 416.34 398.08
0167-773-110 4501 AVONDALE CIR
Single-Family
Residential 16.04 543.95 520.12
0167-773-120 1102 BUNKER CT
Single-Family
Residential 16.45 557.92 533.48
0167-773-130 1106 BUNKER CT
Single-Family
Residential 16.17 548.63 524.60
0167-773-140 1110 BUNKER CT
Single-Family
Residential 17.87 606.22 579.66
0167-773-150 4503 AVONDALE CIR
Single-Family
Residential 13.15 446.18 426.62
0167-773-160 4510 AVONDALE CIR
Single-Family
Residential 14.01 475.33 454.50
0167-781-010 1004 YARKON CT
Single-Family
Residential 12.54 425.28 406.64
0167-781-020 1008 YARKON CT
Single-Family
Residential 13.91 471.69 451.02
0167-781-030 1012 YARKON CT
Single-Family
Residential 15.13 513.36 490.88
0167-781-040 1016 YARKON CT
Single-Family
Residential 13.67 463.53 443.22
0167-781-050 1011 YARKON CT
Single-Family
Residential 13.83 469.22 448.66
0167-781-060 1007 YARKON CT
Single-Family
Residential 13.59 460.88 440.70
0167-781-070 4432 AVONDALE CIR
Single-Family
Residential 13.26 449.89 430.18
0167-781-080 4428 AVONDALE CIR
Single-Family
Residential 14.37 487.58 466.22
0167-781-090 1002 CHATSWOOD CT
Single-Family
Residential 13.27 450.10 430.38
0167-781-100 1006 CHATSWOOD CT
Single-Family
Residential 14.41 488.65 467.24
0167-781-110 1010 CHATSWOOD CT
Single-Family
Residential 16.00 542.58 518.80
0167-781-120 1014 CHATSWOOD CT
Single-Family
Residential 13.97 474.02 453.26
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 30 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-781-130 1013 CHATSWOOD CT
Single-Family
Residential 13.44 455.94 435.96
0167-781-140 1009 CHATSWOOD CT
Single-Family
Residential 15.39 521.92 499.06
0167-781-150 1005 CHATSWOOD CT
Single-Family
Residential 13.05 442.71 423.32
0167-781-160 1001 CHATSWOOD CT
Single-Family
Residential 14.30 485.04 463.78
0167-781-170 4404 AVONDALE CIR
Single-Family
Residential 13.41 454.91 434.98
0167-782-010 4401 AVONDALE CIR
Single-Family
Residential 20.19 684.83 654.82
0167-782-020 4405 AVONDALE CIR
Single-Family
Residential 15.92 540.14 516.48
0167-782-030 4409 AVONDALE CIR
Single-Family
Residential 13.51 458.22 438.16
0167-782-040 4413 AVONDALE CIR
Single-Family
Residential 12.32 417.82 399.52
0167-782-050 4417 AVONDALE CIR
Single-Family
Residential 13.60 461.27 441.06
0167-782-060 4421 AVONDALE CIR
Single-Family
Residential 13.82 468.70 448.18
0167-782-070 4425 AVONDALE CIR
Single-Family
Residential 14.86 504.07 482.00
0167-782-080 4429 AVONDALE CIR
Single-Family
Residential 14.30 484.95 463.70
0167-782-090 4433 AVONDALE CIR
Single-Family
Residential 13.35 452.78 432.94
0167-782-100 4437 AVONDALE CIR
Single-Family
Residential 13.97 473.87 453.12
0167-782-110 4441 AVONDALE CIR
Single-Family
Residential 13.32 451.68 431.90
0167-782-120 4445 AVONDALE CIR
Single-Family
Residential 14.14 479.68 458.66
0167-782-130 4449 AVONDALE CIR
Single-Family
Residential 12.48 423.51 404.96
0167-782-140 No Benefit 0.00 0.00 0.00
0167-831-070 Undeveloped 1.22 58.09 56.68
0167-831-080 Undeveloped 10.41 495.94 483.90
0167-841-010 1408 COUPLES CIR
Single-Family
Residential 12.46 422.70 404.18
0167-841-020 1404 COUPLES CIR
Single-Family
Residential 13.69 464.28 443.94
0167-841-030 1400 COUPLES CIR
Single-Family
Residential 12.80 434.18 415.14
0167-841-040 1396 COUPLES CIR
Single-Family
Residential 13.01 441.39 422.04
0167-841-050 1392 COUPLES CIR
Single-Family
Residential 14.12 478.90 457.92
0167-841-060 1388 COUPLES CIR
Single-Family
Residential 12.71 431.00 412.12
0167-841-070 1384 COUPLES CIR
Single-Family
Residential 14.94 506.63 484.44
0167-841-080 1380 COUPLES CIR
Single-Family
Residential 13.71 465.17 444.78
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 31 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-841-090 1376 COUPLES CIR
Single-Family
Residential 12.60 427.38 408.66
0167-841-100 1372 COUPLES CIR
Single-Family
Residential 14.01 475.37 454.54
0167-841-110 1368 COUPLES CIR
Single-Family
Residential 12.75 432.64 413.68
0167-841-120 1364 COUPLES CIR
Single-Family
Residential 14.65 497.03 475.26
0167-841-130 1360 COUPLES CIR
Single-Family
Residential 12.36 419.27 400.90
0167-841-140 1356 COUPLES CIR
Single-Family
Residential 12.34 418.75 400.40
0167-841-150 1352 COUPLES CIR
Single-Family
Residential 13.67 463.54 443.24
0167-841-160 No Benefit 0.00 0.00 0.00
0167-841-170 4921 COUPLES CIR
Single-Family
Residential 13.57 460.31 440.14
0167-841-180 4917 COUPLES CIR
Single-Family
Residential 13.61 461.76 441.54
0167-841-190 4913 COUPLES CT
Single-Family
Residential 11.67 395.87 378.52
0167-841-200 4909 COUPLES CIR
Single-Family
Residential 13.23 448.77 429.10
0167-841-210 4905 COUPLES CIR
Single-Family
Residential 12.81 434.66 415.62
0167-841-220 4901 COUPLES CIR
Single-Family
Residential 13.73 465.66 445.26
0167-842-010 1359 COUPLES CIR
Single-Family
Residential 14.77 501.04 479.08
0167-842-020 1363 COUPLES CIR
Single-Family
Residential 11.99 406.74 388.92
0167-842-030 1367 COUPLES CIR
Single-Family
Residential 12.30 417.40 399.12
0167-842-040 1371 COUPLES CIR
Single-Family
Residential 11.97 406.03 388.24
0167-842-050 1375 COUPLES CIR
Single-Family
Residential 12.28 416.48 398.24
0167-842-060 1379 COUPLES CIR
Single-Family
Residential 13.91 471.72 451.04
0167-842-070 1383 COUPLES CIR
Single-Family
Residential 14.20 481.51 460.42
0167-842-080 1387 COUPLES CIR
Single-Family
Residential 12.21 414.35 396.20
0167-842-090 1391 COUPLES CIR
Single-Family
Residential 14.15 479.83 458.82
0167-842-100 1395 COUPLES CIR
Single-Family
Residential 11.84 401.56 383.96
0167-842-110 1399 COUPLES CIR
Single-Family
Residential 12.13 411.51 393.48
0167-842-120 1403 COUPLES CIR
Single-Family
Residential 11.72 397.58 380.16
0167-843-010 1394 STEWART DR
Single-Family
Residential 11.77 399.15 381.66
0167-843-020 1390 STEWART DR
Single-Family
Residential 12.91 437.92 418.74
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 32 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-843-030 1386 STEWART DR
Single-Family
Residential 13.16 446.40 426.84
0167-843-040 1382 STEWART DR
Single-Family
Residential 13.69 464.36 444.02
0167-843-050 1378 STEWART DR
Single-Family
Residential 12.91 437.92 418.74
0167-843-060 1374 STEWART DR
Single-Family
Residential 13.69 464.36 444.02
0167-843-070 1370 STEWART DR
Single-Family
Residential 11.74 398.11 380.66
0167-843-080 1366 STEWART DR
Single-Family
Residential 13.45 456.40 436.40
0167-843-090 1362 STEWART CT
Single-Family
Residential 12.64 428.69 409.90
0167-843-100 1358 STEWART CT
Single-Family
Residential 13.75 466.32 445.90
0167-843-110 1354 STEWART CT
Single-Family
Residential 11.77 399.19 381.70
0167-843-120 1350 STEWART CT
Single-Family
Residential 15.31 519.47 496.70
0167-851-010 4845 DUVAL ST
Single-Family
Residential 13.53 459.05 438.94
0167-851-020 4841 DUVAL ST
Single-Family
Residential 13.32 451.74 431.94
0167-851-030 4837 DUVAL ST
Single-Family
Residential 13.79 467.69 447.20
0167-851-040 4833 DUVAL ST
Single-Family
Residential 13.40 454.53 434.62
0167-851-050 4829 DUVAL ST
Single-Family
Residential 12.97 439.96 420.68
0167-851-060 4825 DUVAL ST
Single-Family
Residential 13.75 466.41 445.98
0167-851-070 4821 DUVAL ST
Single-Family
Residential 11.99 406.67 388.86
0167-851-080 4817 DUVAL ST
Single-Family
Residential 13.99 474.40 453.62
0167-851-090 4813 DUVAL ST
Single-Family
Residential 13.02 441.57 422.22
0167-852-010 1415 THUNDERBIRD CT
Single-Family
Residential 13.35 452.80 432.96
0167-852-020 1419 THUNDERBIRD CT
Single-Family
Residential 14.20 481.78 460.68
0167-852-030 1422 THUNDERBIRD CT
Single-Family
Residential 14.15 479.98 458.96
0167-852-040 1418 THUNDERBIRD CT
Single-Family
Residential 13.98 474.36 453.58
0167-852-050 4816 DUVAL ST
Single-Family
Residential 11.55 391.74 374.58
0167-852-060 4820 DUVAL ST
Single-Family
Residential 12.75 432.48 413.52
0167-852-070 4824 DUVAL ST
Single-Family
Residential 13.29 450.74 431.00
0167-852-080 1413 JONES CT
Single-Family
Residential 13.85 469.66 449.08
0167-852-090 1417 JONES CT
Single-Family
Residential 12.63 428.44 409.66
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 33 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-852-100 1424 JONES CT
Single-Family
Residential 13.49 457.58 437.52
0167-852-110 1420 JONES CT
Single-Family
Residential 14.06 476.75 455.88
0167-852-120 4828 DUVAL ST
Single-Family
Residential 13.76 466.65 446.20
0167-852-130 4832 DUVAL ST
Single-Family
Residential 12.52 424.61 406.00
0167-852-140 4836 DUVAL ST
Single-Family
Residential 13.15 446.18 426.62
0167-852-150 4840 DUVAL ST
Single-Family
Residential 13.10 444.25 424.78
0167-852-160 1381 STEWART DR
Single-Family
Residential 13.66 463.28 442.98
0167-852-170 1385 STEWART DR
Single-Family
Residential 12.73 431.84 412.92
0167-852-180 1389 STEWART DR
Single-Family
Residential 13.26 449.74 430.04
0167-852-190 1393 STEWART DR
Single-Family
Residential 12.73 431.84 412.92
0167-852-200 1397 STEWART DR
Single-Family
Residential 13.38 453.85 433.96
0167-852-210 1401 STEWART DR
Single-Family
Residential 12.46 422.81 404.28
0167-852-220 1405 STEWART DR
Single-Family
Residential 12.99 440.71 421.40
0167-852-230 1409 STEWART DR
Single-Family
Residential 12.72 431.49 412.58
0167-852-240 1413 STEWART DR
Single-Family
Residential 12.99 440.71 421.40
0167-852-250 1417 STEWART DR
Single-Family
Residential 12.46 422.81 404.28
0167-852-260 1421 STEWART DR
Single-Family
Residential 13.06 442.89 423.48
0167-853-010 1414 STEWART DR
Single-Family
Residential 13.52 458.74 438.64
0167-853-020 1410 STEWART DR
Single-Family
Residential 11.38 386.03 369.12
0167-853-030 1406 STEWART DR
Single-Family
Residential 12.51 424.31 405.72
0167-853-040 1402 STEWART DR
Single-Family
Residential 12.95 439.23 419.98
0167-853-050 1398 STEWART DR
Single-Family
Residential 13.68 464.20 443.86
0167-854-010 1422 STEWART DR
Single-Family
Residential 13.42 455.14 435.20
0167-854-020 1418 STEWART DR
Single-Family
Residential 11.87 402.72 385.08
0167-855-010 1407 COUPLES CIR
Single-Family
Residential 12.11 410.71 392.72
0167-855-020 1411 COUPLES CIR
Single-Family
Residential 14.02 475.73 454.88
0167-855-030 1415 COUPLES CIR
Single-Family
Residential 12.08 409.76 391.80
0167-855-040 1419 COUPLES CIR
Single-Family
Residential 11.77 399.17 381.68
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 34 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-855-050 1423 COUPLES CIR
Single-Family
Residential 12.10 410.53 392.54
0167-855-060 1427 COUPLES CIR
Single-Family
Residential 13.98 474.32 453.54
0167-855-070 1431 COUPLES CIR
Single-Family
Residential 13.21 448.05 428.42
0167-856-010 1436 COUPLES CIR
Single-Family
Residential 13.48 457.29 437.26
0167-856-020 1432 COUPLES CIR
Single-Family
Residential 13.85 469.76 449.18
0167-856-030 1428 COUPLES CIR
Single-Family
Residential 13.77 466.97 446.52
0167-856-040 1424 COUPLES CIR
Single-Family
Residential 14.82 502.84 480.80
0167-856-050 1420 COUPLES CIR
Single-Family
Residential 13.63 462.36 442.10
0167-856-060 1416 COUPLES CIR
Single-Family
Residential 14.48 491.32 469.80
0167-856-070 1412 COUPLES CIR
Single-Family
Residential 13.84 469.31 448.74
0167-856-080 No Benefit 0.00 0.00 0.00
0167-861-010 4809 DUVAL ST
Single-Family
Residential 13.86 470.18 449.58
0167-861-020 4805 DUVAL ST
Single-Family
Residential 13.22 448.33 428.68
0167-861-030 4801 DUVAL ST
Single-Family
Residential 11.82 401.08 383.52
0167-861-040 4797 DUVAL ST
Single-Family
Residential 12.76 432.71 413.76
0167-861-050 4793 DUVAL ST
Single-Family
Residential 14.27 484.18 462.96
0167-861-060 No Benefit 0.00 0.00 0.00
0167-861-070 1401 ANNANDALE DR
Single-Family
Residential 15.16 514.10 491.58
0167-861-080 1405 ANNANDALE DR
Single-Family
Residential 12.30 417.38 399.08
0167-861-090 1409 ANNANDALE DR
Single-Family
Residential 11.95 405.39 387.62
0167-861-100 1413 ANNANDALE DR
Single-Family
Residential 14.40 488.39 466.98
0167-861-110 1417 ANNANDALE DR
Single-Family
Residential 13.20 447.66 428.04
0167-861-120 1421 ANNANDALE DR
Single-Family
Residential 13.20 447.90 428.28
0167-861-130 1425 ANNANDALE DR
Single-Family
Residential 13.62 462.04 441.80
0167-861-140 1429 ANNANDALE DR
Single-Family
Residential 11.91 404.14 386.44
0167-861-150 1433 ANNANDALE CT
Single-Family
Residential 12.93 438.47 419.26
0167-861-160 1437 ANNANDALE CT
Single-Family
Residential 13.33 452.16 432.36
0167-861-170 1441 ANNANDALE CT
Single-Family
Residential 11.74 398.34 380.88
0167-861-180 1445 ANNANDALE CT
Single-Family
Residential 12.89 437.09 417.94
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 35 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-861-190 1449 ANNANDALE CT
Single-Family
Residential 12.75 432.49 413.54
0167-861-200 1453 ANNANDALE CT
Single-Family
Residential 14.91 505.79 483.64
0167-861-210 1446 ANNANDALE CT
Single-Family
Residential 14.89 505.09 482.96
0167-861-220 1442 ANNANDALE CT
Single-Family
Residential 13.51 458.23 438.16
0167-861-230 1438 ANNANDALE CT
Single-Family
Residential 11.90 403.68 386.00
0167-861-240 1434 STEWART DR
Single-Family
Residential 13.91 471.74 451.08
0167-861-250 1430 STEWART DR
Single-Family
Residential 13.76 466.85 446.40
0167-861-260 1426 STEWART DR
Single-Family
Residential 12.98 440.17 420.88
0167-862-010 1425 STEWART DR
Single-Family
Residential 12.93 438.76 419.54
0167-862-020 1429 STEWART DR
Single-Family
Residential 13.21 448.19 428.56
0167-862-030 1433 STEWART DR
Single-Family
Residential 13.10 444.41 424.94
0167-862-040 1437 STEWART DR
Single-Family
Residential 14.50 491.73 470.18
0167-862-050 4800 CHESAPEAKE CT
Single-Family
Residential 13.93 472.42 451.72
0167-862-060 4804 CHESAPEAKE CT
Single-Family
Residential 13.67 463.76 443.44
0167-862-070 4808 CHESAPEAKE CT
Single-Family
Residential 14.29 484.60 463.38
0167-862-080 4805 CHESAPEAKE CT
Single-Family
Residential 13.58 460.60 440.42
0167-862-090 1410 ANNANDALE DR
Single-Family
Residential 13.35 452.69 432.86
0167-862-100 1406 ANNANDALE DR
Single-Family
Residential 12.85 435.74 416.64
0167-862-110 1402 ANNANDALE DR
Single-Family
Residential 13.79 467.76 447.28
0167-862-120 4804 DUVAL ST
Single-Family
Residential 12.69 430.35 411.50
0167-862-130 4808 DUVAL ST
Single-Family
Residential 11.55 391.73 374.56
0167-862-140 4812 DUVAL ST
Single-Family
Residential 12.76 432.83 413.86
0167-862-150 1411 THUNDERBIRD CT
Single-Family
Residential 13.82 468.86 448.32
0167-863-010 1435 COUPLES CIR
Single-Family
Residential 14.03 475.79 454.94
0167-863-020 1439 COUPLES CIR
Single-Family
Residential 11.73 397.98 380.54
0167-863-030 1443 COUPLES CIR
Single-Family
Residential 14.00 474.74 453.94
0167-863-040 1447 COUPLES CIR
Single-Family
Residential 13.11 444.75 425.26
0167-863-050 1451 COUPLES CIR
Single-Family
Residential 12.46 422.58 404.06
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 36 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-864-010 1456 COUPLES CIR
Single-Family
Residential 13.91 471.87 451.20
0167-864-020 1452 COUPLES CIR
Single-Family
Residential 12.52 424.78 406.18
0167-864-030 No Benefit 0.00 0.00 0.00
0167-864-040 1444 COUPLES CIR
Single-Family
Residential 13.79 467.92 447.42
0167-864-050 1440 COUPLES CIR
Single-Family
Residential 14.21 481.95 460.84
0167-950-010 No Benefit 0.00 0.00 0.00
0167-950-020 No Benefit 0.00 0.00 0.00
0167-950-030 No Benefit 0.00 0.00 0.00
0167-951-010 4427 TAHITI DR
Single-Family
Residential 6.05 288.46 281.44
0167-951-020 4431 TAHITI DR
Single-Family
Residential 6.56 312.56 304.96
0167-951-030 4435 TAHITI DR
Single-Family
Residential 6.02 286.99 280.00
0167-951-040
Single-Family
Residential 2.34 111.42 108.70
0167-951-050 4443 TAHITI DR
Single-Family
Residential 5.97 284.69 277.76
0167-951-060 4447 TAHITI DR
Single-Family
Residential 6.51 310.21 302.66
0167-951-070 4451 TAHITI DR
Single-Family
Residential 6.00 286.01 279.06
0167-951-080 4455 TAHITI DR
Single-Family
Residential 6.87 327.09 319.14
0167-951-090 4459 TAHITI DR
Single-Family
Residential 6.01 286.22 279.26
0167-951-100 4463 TAHITI DR
Single-Family
Residential 6.53 311.06 303.50
0167-951-110 4467 TAHITI DR
Single-Family
Residential 6.00 286.11 279.14
0167-951-120 4471 TAHITI DR
Single-Family
Residential 6.87 327.09 319.14
0167-951-130 4475 TAHITI DR
Single-Family
Residential 6.00 286.11 279.14
0167-951-140 4479 TAHITI DR
Single-Family
Residential 6.53 311.16 303.58
0167-951-150 4483 TAHITI CT
Single-Family
Residential 6.88 327.62 319.64
0167-951-160 4487 TAHITI CT
Single-Family
Residential 6.01 286.40 279.44
0167-951-170 No Benefit 0.00 0.00 0.00
0167-951-180 No Benefit 0.00 0.00 0.00
0167-951-190 4500 TAHITI CT
Single-Family
Residential 7.16 340.99 332.70
0167-951-200 4496 TAHITI CT
Single-Family
Residential 6.14 292.75 285.64
0167-951-210 4492 TAHITI CT
Single-Family
Residential 7.19 342.34 334.02
0167-951-220 4488 TAHITI CT
Single-Family
Residential 7.04 335.45 327.28
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 37 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-951-230 4484 TAHITI CT
Single-Family
Residential 6.34 302.05 294.70
0167-951-240 No Benefit 0.00 0.00 0.00
0167-951-250 4476 BAHAMA WAY
Single-Family
Residential 6.60 314.29 306.64
0167-951-260 4472 BAHAMA WAY
Single-Family
Residential 6.76 322.17 314.32
0167-951-270 4468 BAHAMA WAY
Single-Family
Residential 7.00 333.43 325.32
0167-951-280 4464 BAHAMA WAY
Single-Family
Residential 6.62 315.46 307.78
0167-951-290 4460 BAHAMA WAY
Single-Family
Residential 6.06 288.82 281.80
0167-951-300 4456 BAHAMA WAY
Single-Family
Residential 8.09 385.39 376.02
0167-951-310 4452 BAHAMA WAY
Single-Family
Residential 6.62 315.43 307.76
0167-951-320 4448 BAHAMA WAY
Single-Family
Residential 6.92 329.77 321.74
0167-951-330 4444 BAHAMA WAY
Single-Family
Residential 6.05 288.07 281.06
0167-951-340 4440 BAHAMA WAY
Single-Family
Residential 7.05 335.87 327.70
0167-951-350 4443 CANCUN CT
Single-Family
Residential 6.15 292.96 285.84
0167-951-360 4447 CANCUN CT
Single-Family
Residential 6.53 310.90 303.34
0167-951-370 4451 CANCUN CT
Single-Family
Residential 6.85 326.50 318.56
0167-951-380 4455 CANCUN CT
Single-Family
Residential 5.99 285.50 278.56
0167-951-390 4459 CANCUN CT
Single-Family
Residential 6.52 310.58 303.02
0167-951-400 4463 CANCUN CT
Single-Family
Residential 6.85 326.61 318.66
0167-951-410 4467 CANCUN CT
Single-Family
Residential 6.64 316.21 308.52
0167-951-420 4471 CANCUN CT
Single-Family
Residential 7.37 351.20 342.66
0167-951-430 4464 CANCUN CT
Single-Family
Residential 7.19 342.57 334.24
0167-951-440 4460 CANCUN CT
Single-Family
Residential 6.91 329.14 321.12
0167-951-450 4456 CANCUN CT
Single-Family
Residential 7.15 340.67 332.38
0167-951-460 4452 CANCUN CT
Single-Family
Residential 6.68 318.07 310.34
0167-951-470 4448 CANCUN CT
Single-Family
Residential 6.90 328.62 320.62
0167-951-480 4444 CANCUN CT
Single-Family
Residential 5.96 283.94 277.04
0167-951-490 Undeveloped 0.12 5.74 5.60
0167-951-500 4417 CANCUN DR
Single-Family
Residential 6.79 323.68 315.80
0167-951-510 4421 CANCUN DR
Single-Family
Residential 6.87 327.44 319.48
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 38 of 39 04/30/2025 03:08:44PM
City of Fairfield
Lighting Maintenance District No. 2023-11 (Paradise Valley) Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0167-951-520 4425 CANCUN DR
Single-Family
Residential 6.52 310.82 303.26
0167-951-530 4429 CANCUN DR
Single-Family
Residential 6.84 325.70 317.78
0167-951-540 No Benefit 0.00 0.00 0.00
0167-951-550 No Benefit 0.00 0.00 0.00
0167-951-560 No Benefit 0.00 0.00 0.00
0167-951-570 No Benefit 0.00 0.00 0.00
0167-952-010 4440 TAHITI DR
Single-Family
Residential 6.17 293.87 286.72
0167-952-020 4444 TAHITI DR
Single-Family
Residential 6.58 313.46 305.84
0167-952-030 4448 TAHITI DR
Single-Family
Residential 6.07 289.17 282.12
0167-952-040 4452 TAHITI DR
Single-Family
Residential 6.94 330.42 322.38
0167-952-050 4456 TAHITI DR
Single-Family
Residential 6.07 289.17 282.12
0167-952-060 4460 TAHITI DR
Single-Family
Residential 6.60 314.36 306.72
0167-952-070 4464 TAHITI DR
Single-Family
Residential 6.95 331.14 323.08
0167-952-080 4468 TAHITI DR
Single-Family
Residential 6.11 291.24 284.16
0167-952-090 4472 TAHITI DR
Single-Family
Residential 6.61 315.17 307.50
0167-952-100 4476 TAHITI DR
Single-Family
Residential 7.03 334.83 326.70
0167-952-110 Undeveloped 0.13 6.37 6.20
0167-952-120 4475 BAHAMA WAY
Single-Family
Residential 6.02 286.90 279.92
0167-952-130 4471 BAHAMA WAY
Single-Family
Residential 6.53 310.93 303.36
0167-952-140 4467 BAHAMA WAY
Single-Family
Residential 6.02 287.05 280.08
0167-952-150 4463 BAHAMA WAY
Single-Family
Residential 6.86 326.71 318.76
0167-952-160 4459 BAHAMA WAY
Single-Family
Residential 6.00 285.77 278.82
0167-952-170 4455 BAHAMA WAY
Single-Family
Residential 6.52 310.79 303.24
0167-952-180 4451 BAHAMA WAY
Single-Family
Residential 6.00 285.79 278.84
0167-952-190 4447 BAHAMA WAY
Single-Family
Residential 6.53 310.94 303.38
0167-952-200 4443 BAHAMA WAY
Single-Family
Residential 6.84 326.01 318.08
0167-952-210 4441 BAHAMA WAY
Single-Family
Residential 6.60 314.27 306.62
15,720.69 $593,238.07 $571,315.901,113 Accounts
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 39 of 39 04/30/2025 03:08:44PM
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-11 (Paradise Valley) – Fiscal Year 2025/26 Report 28
10. REFERENCES
Beutz v. Cnty. of Riverside, 184 Cal. App. 4th 1516, 1532 (2010) Broad Beach Geologic Hazard Abatement District v 31506 Victoria Point LLC, B304699 (81 Cal. App. 5th 1068, 1090 (2022))
National Cooperative Highway Research Program, “Transportation Research Board of The National Academies 2009 Annual Report”, 2009.
Coder, Kim D. “Identified Benefits of Community Trees and Forests.” University of Georgia Cooperative Extension Service - Forest Resources Publication, October 1996.
Van Dillen, Sonja et. al, “Greenspace in urban neighborhoods and residents’ health: Adding quality to quantity”, 2012.
Crompton, John L. "Parks and Economic Development." American Planning Association, p. 31-48, 2001.
Department of Parks and Recreation, California (DPR). "The Health and Social Benefits of Recreation." Sacramento, CA: California State Parks, March 2005.
Golden Hill Neighborhood Assn. v. City of San Diego CA4/1, D062203 (199 Cal. App. 4th 416, 438 (2011)) Iris Vilnai-Yavetz & Shaked Gilboa (2010) The Effect of Servicescape Cleanliness on Customer Reactions, Services Marketing Quarterly, 10.1080/15332961003604386 Kearney, Anne R. "Residential Development Patterns and Neighborhood Satisfaction: Impacts of Density and Nearby Nature." Environment and Behavior, 38, 112-139, 2006.
Rea, Mark S., et al. "Review of the Safety Benefits and Other Effects of Roadway Lighting." National Cooperative Highway Research Program Transportation Research Board of the National Academies, June 2009.
Throsby, D. “Cultural heritage as financial asset in strategies for urban development and poverty alleviation.” Paper for International Conference for Integrating Urban Knowledge & Practice, 2005.
Fairfield, City of. “Average Daily Traffic (ADT) Citywide Traffic Counts Map (Updated 2018)”, https://fairfield.maps.arcgis.com/apps/webappviewer/index.html?id=908b0082da8c47be87fb0689 75b69d35
Fairfield, City of. “City of Fairfield Design, Construction and Materials Specification Handbook”, 2020.
Town of Tiburon v. Bonander, 180 Cal. App. 4th 1057, 1084 (2009) "Trip Generation Manual, 11th Edition." Washington, D.C.: Institute of Transportation Engineers, 2022.
CITY OF FAIRFIELD
RESOLUTION NO. 2025-97
GRANTING PRELIMINARY APPROVAL OF THE FISCAL YEAR 2025-2026 ENGINEER’S REPORT,
DECLARING INTENTION TO ORDER THE LEVY AND COLLECTION OF ASSESSMENTS, AND
PROVIDING NOTICE OF A PUBLIC HEARING FOR LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2023-1 (GATEWAY)
WHEREAS, on June 4, 1991, this City C ouncil adopted Resolution No. 91 -136, a Continuing Resolution Directing Preparation of Annual Report for Maintenance Assessment Districts.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. Pursuant to said resolution, the engineer designated therein prepared a report in accordance with Section 22565 et seq. of the California Streets and Highways Code for the Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) (District). Said report, for fiscal year (FY) 2025-2026, ordered by the council and on file in the office of the city clerk, has been duly considered by this council and is hereby deemed sufficient and given preliminary approval. Said report shall constitute the engineer’s report for FY 2025-2026 (Engineer’s Report).
Section 2. It is the intention of this council to levy and collect assessments within the District for FY 2025-2026. The budgeted expenditures, as itemized in Attachment 1, include various administration, and the maintenance of various lighting and landscaping improvements. The lighting improvements to be financed by the District are located in the street rights -of-way and perimeter areas within the boundaries of the District and may be briefly des cribed the maintenance, operation, and servicing of street lighting, including theme light poles, ornamental lighting and other appurtenant facilities, including all works or improvements used or useful for the lighting of any public places, including orna mental standards, luminaires, poles, supports, tunnels, manholes, vaults, conduits, pipes, wires, conductors, guys, stubs, platforms, braces, transformers, insulators, contacts, switches, capacitors, meters, communication circuits, appliances, attachments, and appurtenances. Maintenance, operation, and servicing includes, but is not limited to, personnel, furnishing utilities, electrical energy and timing/switching, lamp changing, emergency services, pole painting, fixture cleaning, glassware replacement, a nd rehabilitation, which includes modernization and replacement of systems; repairs, including poles, conduit, wiring and fusing, and fixtures repair and replacement, contracting services and other items necessary for the satisfactory operation of these services.
The landscaping improvements are generally described as: the maintenance, operation, and servicing of trees, landscape and appurtenant facilities in the public right of way areas, as well as open space, trails and green belt areas dispersed throu ghout the District. Eligible District costs may include, but are not limited to, personnel, furnishing electrical energy, utilities such as water and gas, materials, contracting services, and other items necessary for the satisfactory operation of these services. Other improvements authorized to be maintained and serviced include, but are
RES. NO. 2025-97
not limited to groundcover, turf, trees, shrubs, planters, the landscaped areas and weed abatement of open spaces, and may also include sidewalk and hardscape improvements, entry monuments and associated appurtenant facilities. There are no substantial changes to be made from the previous fiscal year.
Section 3. Said District consists of the lots and parcels shown on the boundary map of the District on file with the city clerk in the City of Fairfield.
Section 4. The total FY 2025 -2026 assessment levy for the District is proposed at $349,059, which is a less than 1% increase from the total FY 2024 -2025 assessment levy of $346,288.
Assessment rates for each parcel vary de pending on multiple factors as described in Sections 2 - 6 of the proposed Engineer’s Report and are below the maximum allowable rates established in 2023. The proposed assessments do not exceed maximum rates adopted by the District, which are adjusted each year by the February SF-Oakland-Hayward All Urban Consumers Consumer Price Index (CPI).
Section 5. Reference is hereby made to the Engineer’s Report, on file with the city clerk, for a full and detailed description of the improvements, the boundaries of the District , and the proposed assessments upon assessable lots and parcels of land within the District. Any public property owned by any public agency or in use in the performance of a public function within the District may be assessed.
Section 6. This council hereby orders that a public hearing shall be held before this council in the regular meeting place thereof at the Council Chamber, Civic Center, 1000 Webster Street, Fairfield, California, or in any other manner as specified on the regular meeting agenda, as follows:
The public hearing shall be held on July 1, 2025, at the hour of 6:00 p.m., or as soon as possible thereafter, for the purposes of this council’s determination whether the public interest, convenience, and necessity require that the proposed levy be made, and this council’s final action upon the Engineer’s Report and the assessment therein. The agenda will be available on the City’s website, www.fairfield.ca.gov, at least 72 hours prior to the meeting.
Section 7. The city clerk shall cause notice of the hearing to be given by publishing a copy of this resolution once in the Daily Republic, a newspaper published and circulated in the city , at least ten days prior to the date of the public hearing specified in this resolution.
RES. NO. 2025-97
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________
_________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2023-1 (GATEWAY) FUND 187
FY 2025-2026 BUDGET PROJECTIONS
BUDGET
OBJECT FY23-24 Budget FY23-24 Actual FY24-25 Actual* FY24-25 Budget FY24-25 Proj FY25-26 Proj FY26-27 Proj FY27-28 Proj FY28-29 Proj FY29-30 Proj 6106 - SPECIAL ASSESSMENTS 338,154 338,191 173,144 346,288 346,288 349,059 356,610 367,309 378,328 389,678 6401 - INT INC ON POOLED INVESTMENTS - 3,155 2,001 500 500 2,431 3,152 2,699 3,462 4,254 7600 - TRANSFERS IN 83,318 83,281 55,914 89,457 93,473 89,670 91,627 94,376 97,207 100,124 TOTAL REVENUE 421,472 424,626 231,059 436,245 440,260 441,160 451,390 464,383 478,997 494,056 City Staff Costs
8101 - SALARIES 9,385 12,214 7,333 14,154 15,040 20,139 20,665 21,284 21,923 22,581 8103 - OVERTIME 18 23 - - - - - - - - 8105 - LEAVE TIME 1,679 2,185 2,123 1,998 2,123 - - - - - 8111 - BUDGETED SALARY SAVINGS - - - (712) (757) (1,015) (1,041) (1,072) (1,105) (1,138) 8209 - MEDICARE TAX 159 206 158 202 214 289 297 306 315 324 8210 - DEFERRED COMPENSATION 771 1,004 668 981 1,042 1,208 1,244 1,281 1,319 1,359 8211 - ICMA VANTAGECARE RETIREE HLTH 46 60 43 73 78 102 102 105 108 111 8212 - POB ER RATE 304 396 397 561 596 798 795 819 843 869 8219 - UNIFORM/EQUIP/BOOT/AUTO 8 11 8 9 10 10 10 10 10 10 8220 - MEDICAL 2,229 2,901 1,664 3,116 3,310 3,404 3,607 3,715 3,826 3,941 8221 - DENTAL AND VISION 137 178 91 185 196 156 292 301 310 319 8235 - LIFE/DISABILITY INSURANCE 39 51 33 49 53 68 70 72 74 76 8238 - SPECIAL COMPENSATION 37 48 30 45 48 120 120 124 127 131 8240 - PERS-MISCELLANEOUS-CLASSIC 443 577 369 542 576 562 555 571 588 606 8241 - PERS-MISCELLANEOUS-PEPRA 758 987 630 956 1,016 1,562 1,565 1,612 1,661 1,711 8242 - PERS-MISCELLANEOUS-UNFUND LIAB 1,636 2,129 2,439 3,520 3,740 5,780 6,224 6,411 6,603 6,801 8814 - WC INSURANCE CHARGES 251 327 325 465 494 663 950 979 1,008 1,039 8830 - VACATION/SICK LEAVE CHARGES 606 788 832 1,211 1,287 1,726 1,721 1,773 1,826 1,881 Subtotal - City Staff Costs 18,506 24,085 17,144 27,356 29,068 35,573 37,174 38,290 39,438 40,622 Other Administration
8911 - OTHER CONSULTING SERVICES 8,000 1,242 3,730 5,900 5,900 5,900 5,900 6,077 6,259 6,447 9003 - ADVERTISING - 389 - - 500 515 530 546 563 580 9038 - COUNTY ADMIN EXPENSES 4,173 3,382 1,731 3,490 3,490 3,600 3,600 3,708 3,819 3,934 Subtotal - Other Administration 12,173 5,013 5,461 9,390 9,890 10,015 10,030 10,331 10,641 10,961 Tree Maintenance
8403 - TREE TRIMMING/MAINTENANCE - - - - - - 120,000 - - - Subtotal - Tree Maintenance - - - - - - 120,000 - - - Landscaping
8405 - LANDSCAPING MAINTENANCE 182,614 176,726 105,656 181,125 181,125 183,842 189,357 195,038 200,889 206,916 8704 - WATER SERVICES 126,500 53,610 49,660 126,500 100,000 100,000 100,000 103,000 106,090 109,273 9028 - OTHER EXPENSES 16,300 4,698 18,034 16,875 20,000 28,384 28,936 29,804 30,698 31,619 Subtotal - Landscaping 325,414 235,034 173,350 324,500 301,125 312,226 318,293 327,842 337,677 347,807 Streetlights
8334 - STREET LIGHTS 2,227 - - 2,605 2,605 2,823 2,882 2,969 3,058 3,150 8702 - PG&E-ELECTRICITY 8,400 4,561 3,316 8,400 8,400 8,400 8,400 8,652 8,912 9,179 Subtotal - Streetlights 10,627 4,561 3,316 11,005 11,005 11,223 11,282 11,621 11,969 12,328 TOTAL EXPENSE 366,720 268,693 199,272 372,251 351,088 369,037 496,780 388,084 399,726 411,718 NET SURPLUS/DEFICIT 54,752 155,934 31,787 63,994 89,173 72,123 (45,390) 76,300 79,271 82,338
FUND BALANCE
Fund Balance FY23-24 Budget FY23-24 Actual FY24-25 Actual* FY24-25 Budget FY24-25 Proj FY25-26 Proj FY26-27 Proj FY27-28 Proj FY28-29 Proj FY29-30 Proj Beginning Fund Balance - - 153,947 153,947 153,947 243,120 315,243 269,853 346,153 425,423 Net Surplus/Deficit 54,752 155,934 31,787 63,994 89,173 72,123 (45,390) 76,300 79,271 82,338 Mkt Val-Unrealized Gain/Loss - (1,986) - - - - - - - - ENDING FUND BALANCE 54,752 153,947 185,734 217,941 243,120 315,243 269,853 346,153 425,423 507,761 *As of 02/28/25
LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2023-1 (GATEWAY) FUND 187
FY 2025-2026 BUDGET PROJECTIONS
FUND 187 RESERVES BY CATEGORY
RESERVE TYPE FY23-24 Budget FY23-24 Actual FY24-25 Actual* FY24-25 Budget FY24-25 Proj FY25-26 Proj FY26-27 Proj FY27-28 Proj FY28-29 Proj FY29-30 Proj
TREE MAINTENANCE
Beginning Balance - - 37,975 37,975 37,975 77,089 117,376 38,872 81,613 125,637 Contribution 37,975 37,975 - 39,114 39,114 40,287 41,496 42,741 44,023 45,344 Expensed - - - - - - (120,000) - - - Ending balance 37,975 37,975 37,975 77,089 77,089 117,376 38,872 81,613 125,637 170,980
LANDSCAPING
Beginning Balance - - 111,156 111,156 111,156 160,113 190,858 222,856 255,281 289,341 Original Budgeted Contribution 16,300 16,300 - 23,380 23,380 28,384 28,936 29,804 30,698 31,619 Landscaping Budget Surplus/Deficit - 90,380 - - 23,375 - - - - - Admin Budget Surplus/Deficit - 6,956 - - (486) - - - - - City Staff Costs Surplus/Deficit - (5,545) - - (1,700) - - - - - Special Assessments Surplus/Deficit 36 - - - - - - - - Interest Surplus/Deficit - 3,065 - 486 486 2,360 3,062 2,621 3,362 4,132 General Fund Contribution Surplus/Deficit** - (36) - - 3,902 - - - - - Expensed - - - - - - - - - - Ending balance 16,300 111,156 111,156 135,022 160,113 190,858 222,856 255,281 289,341 325,092
STREETLIGHTS
Beginning Balance - - 6,802 6,802 6,802 7,904 8,995 10,111 11,245 12,432 Original Budgeted Contribution 477 477 - 1,000 1,000 1,020 1,026 1,056 1,088 1,121 Streetlights Budget Surplus/Deficit - 6,066 - - - - - - - - Admin Budget Surplus/Deficit - 203 - - (14) - - - - - City Staff Costs Surplus/Deficit - (33) - - (12) - - - - - Special Assessments Surplus/Deficit 1 - - - - - - - - Interest Surplus/Deficit - 90 - 14 14 71 90 77 99 122 General Fund Contribution Surplus/Deficit** - (1) - 114 - - - - - Expensed - - - - - - - - - - Ending balance 477 6,802 6,802 7,816 7,904 8,995 10,111 11,245 12,432 13,675 TOTAL RESERVES BEGINNING BALANCE - - 153,947 153,947 153,947 243,120 315,243 269,853 346,153 425,423 Total Reserve Contribution 54,752 155,934 - 63,994 89,173 72,123 74,610 76,300 79,271 82,338 Total Reserve Expensed - - - - - - (120,000) - - - Total Unassigned* 0 0 - - 0 (0) (0) (0) (0) (0) Mkt Val-Unrealized Gain/Loss - (1,986) - - - - - - - - TOTAL RESERVES ENDING BALANCE 54,752 153,947 153,947 217,941 243,120 315,243 269,853 346,153 425,423 507,761
nbsgov.com
Prepared by:
Corporate Headquarters
32605 Temecula Parkway, Suite 100
Temecula, CA 92592
Toll free: 800.676.7516
Engineer’s Report For:
City of Fairfield Landscaping and
Lighting Maintenance District No.
2023-1 (Gateway)
May 2025
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................ 1
1.1 Background ........................................................................................................................... 1
1.2 Process for Annual Assessment ............................................................................................ 1
1.3 Legislative Context ................................................................................................................ 2
1.4 Court Rulings ......................................................................................................................... 3
2. PLANS AND SPECIFICATIONS ........................................................................................... 5
2.1 Description of Boundaries of the District ............................................................................. 5
2.2 Description of Improvements and Services .......................................................................... 5
3. ESTIMATE OF COSTS ....................................................................................................... 7
3.1 Improvement Costs .............................................................................................................. 7
3.2 Fiscal Year 2025/26 Assessment ........................................................................................... 8
3.3 Fund Balance ........................................................................................................................ 8
4. BENEFITS FROM IMPROVEMENTS ................................................................................... 9
4.1 Street Lighting ....................................................................................................................... 9
4.2 Street Trees and Other Landscaping .................................................................................. 10
5. QUANTIFICATION OF BENEFIT ....................................................................................... 11
5.1 Summary ............................................................................................................................. 11
5.2 General Benefit Analysis ..................................................................................................... 11
6. METHOD OF APPORTIONMENT ..................................................................................... 15
6.1 Parcel Characteristics ......................................................................................................... 15
6.2 Land Use ............................................................................................................................. 16
6.3 Total Special Benefit Points ................................................................................................ 19
6.4 Amount to Be Assessed ...................................................................................................... 20
6.5 FY 2025/26 Assessment Rate per Special Benefit Point for Each Improvement Type ....... 20
6.6 Annual Maximum Assessment Rate Inflation for Each Improvement Type ....................... 20
6.7 Future Changes to Parcel Characteristics ........................................................................... 21
6.8 Data for Annual Assessment Calculations .......................................................................... 21
6.9 Appeals ............................................................................................................................... 22
6.10 Method of Collection .......................................................................................................... 22
7. ENGINEER’S STATEMENT .............................................................................................. 23
8. ASSESSMENT DIAGRAM ................................................................................................ 24
9. ASSESSMENT ROLL ........................................................................................................ 25
10. REFERENCES ................................................................................................................. 26
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 1
1. INTRODUCTION
1.1 Background
The City Council of the City of Fairfield (the “City”) pursuant to the Landscaping and Lighting Act of 1972 (Streets & Highways Code Section 22500 et seq.) (the “1972 Act”), has adopted its Resolution Initiating Proceedings for the Annual Levy and Collection of Assessments and ordered the preparation of an Engineer’s Report for the City’s Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) (the “District”) for Fiscal Year (“FY”) 2025/26.
The Resolution Initiating Proceedings directed NBS to prepare and file an Annual Report for FY 2025/26 pursuant to the requirements of the 1972 Act. The Annual Report presents the plans and specifications describing the general nature, location and extent of the improvements to be maintained, an estimate of the costs of the maintenance, operations and servicing of the improvements for the District for the referenced fiscal year, diagrams for the District, showing the area and properties proposed to be assessed, and an assessment of the estimated costs of the maintenance, operations, and servicing the improvements, assessing the net amount upon all assessable lots and/or parcels in the District in proportion to the special benefit received.
The following assessment is proposed to be authorized in order to pay the estimated costs of administration, maintenance, operation, and servicing of the improvements to be paid by the assessable real property in the District in proportion to the special benefit received.
1.2 Process for Annual Assessment
The District was formed and assessments were established in previous fiscal years. As required by the procedures specified in the Act, an Engineer’s Report must be prepared on an annual basis which contains a full and detailed description of the improvements, the boundaries of the assessment district and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the assessment district. The Engineer’s Report may also identify future planned projects.
The City Council must also annually adopt a resolution of intention which:
Declares the intention of the City Council to levy and collect assessments within the assessment district for the fiscal year stated therein.
Generally describes the existing and proposed improvements and any substantial changes proposed to be made in existing improvements.
Refers to the assessment district by its distinctive designation and indicates the general location of the assessment district.
Refers to the report of the engineer, on file with the City Clerk, for a full and detailed description of the improvements, the boundaries of the assessment district and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the assessment district. Gives notice of the time and place for public hearing by the City Council on the levy of the proposed assessment.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 2 States whether the assessment is proposed to increase from the previous year.
If the assessments are to be levied in the same or lesser amounts than the maximum assessment allowed, the City Clerk shall give notice of the public hearing by causing the resolution of intention to be published at least 10 days prior to the date of the public hearing. Any interested person may, prior to the conclusion of the public hearing, file a written protest which shall state all grounds of objection. The protest shall contain a description sufficient to identify the property owned by the property owner filing the protest.
During the course or upon conclusion of the hearing, the City Council may order changes in any of the matters provided in the report, including changes in the improvements, any zones within the assessment district, and the proposed diagram or the proposed assessment. If the assessment to be levied exceeds the maximum assessment allowed, the City must comply with the procedures specified in Article XIII D and Proposition 218.
The City Council, upon conclusion of the public hearing must then adopt a resolution confirming the diagram and assessment, either as originally proposed or as changed by it. The adoption of the resolution shall constitute the levy of an assessment for the fiscal year referred to in the assessment. If confirmed, the assessments would be submitted to the County Auditor Controller for inclusion on the property tax roll.
1.3 Legislative Context
In 1996, California voters adopted Proposition 218, known as the “Right to Vote on Taxes Act,” which added Articles XIII C and XIII D to the California Constitution. Article XIII D established new substantive and procedural requirements on agencies for levying assessments, being levies on real property by an agency for a special benefit conferred upon the real property. “Special benefit” is defined in Article XIII D as “a particular and distinct benefit over and above general benefits conferred on a real property located in the district or to the public at large.”
Article XIII D imposes five basic substantive requirements on assessments:
1. All parcels that will have a special benefit conferred upon them and upon which an assessment will be imposed must be identified;
2. The general benefits must be distinguished from the special benefits conferred on the parcels;
3. The proportionate special benefit derived by each identified parcel must be determined in relationship to the entirety of the capital cost of a public improvement, the maintenance and operation expenses of a public improvement, or the cost of the property related service being provided;
4. The amount assessed to a parcel must not exceed the reasonable cost of the proportional special benefit conferred on that parcel and must not include any costs attributable to the general benefit; and
5. Parcels within a district that are owned or used by any agency, the State of California or the United States shall not be exempt from assessment unless the agency can demonstrate by clear and convincing evidence that those publicly owned parcels in fact receive no special benefit.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 3 Article XIII D also places procedural requirements on assessments, which include preparing an engineer’s report, providing written notice of the proposed assessment and a public hearing to property owners, holding a public hearing, and providing for a protest ballot proceeding.
1.4 Court Rulings
Since the initial passage of Proposition 218, several court rulings have helped provide context and direction with respect to the procedures and requirements of Article XIII D for levying assessments. Several of the key concepts from these rulings are summarized below.
1.4.1 GENERAL BENEFIT
Article XIII D requires an agency to separate the general benefits from the special benefits conferred on the identified parcels because only special benefits are assessable.
The Court of Appeal in Golden Hills Neighborhood Assn., Inc. v. City of San Diego (2011) (“Golden Hills”) clarified this concept by stating, “Separation and quantification of general and special benefits must be accomplished by apportioning the cost of a service or improvement between the two and assessing property owners only for the portion of the cost representing special benefits.” The Court of Appeal in Beutz v. County of Riverside (2010) (“Beutz”) noted that the trial court took judicial notice of the Legislative Analyst’s Office pamphlet titled “Understanding Proposition 218” which states an agency must, “estimate the amount of special benefit landowners would receive from the project or service, as well as the amount of ‘general benefit.’ This step is needed because Proposition 218 allows local government to recoup from assessments only the proportionate share of cost to provide the special benefit.”
The Court in Beutz furthered this idea stating, “Separating the general from the special benefits of a public improvement project and estimating the quantity of each in relation to the other is essential if an assessment is to be limited to the special benefits.”
The Court of Appeal again reiterated the need to separate, quantify and apportion costs to general benefits from the improvements in Broad Beach Geologic Hazard Abatement District v 31506 Victoria Point LLC (2022), stating, “The District cites no authority, and we are aware of none, suggesting that an agency’s subjective intent determines the need to account for general benefits.”
1.4.2 BENEFIT-BASED NOT COST-BASED
In Town of Tiburon v. Bonander (2009) (“Tiburon”), the Court of Appeal clarified the idea that assessments must be apportioned based upon benefit rather than cost. The Court stated, “Proportionate special benefit is the basis upon which a project’s total assessable costs are apportioned among parcels within an assessment district.”
The assessment on a particular property cannot be based on the relative cost of the improvements to the property, but rather on the special benefit conferred on such property. The Court in Tiburon also stated, “an assessment represents the entirety of the cost of the improvement or property-related service, less any amount attributable to general benefits (which may not be assessed), allocated to individual properties in proportion to the relative special benefit conferred on the property.”
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 4
1.4.3 MEASURING AND APPORTIONING SPECIAL BENEFIT
The Court in Tiburon acknowledged the difficulty of trying to precisely assign and measure special benefit, stating, “Any attempt to classify special benefits conferred on particular properties and to assign relative weights to those benefits will necessarily involve some degree of imprecision.” The Court in Tiburon went on to say that a formula assigning equal weight to different special benefits “may be a legally justifiable approach to measuring and apportioning special benefits, [but] it is not necessarily the only valid approach. Whichever approach is taken to measuring and apportioning special benefits, however, it must be both defensible and consistently applied.”
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 5
2. PLANS AND SPECIFICATIONS
Pursuant to sections 22567(a) and 22568 of the 1972 Act, this report describes the existing and any proposed improvements for the District. The purpose of the District is to provide for the continued maintenance, operation, and servicing of various public improvements specially benefiting property within the District. The sections below provide general descriptions of the improvements maintained by the District.
The assessments will fund the following maintenance, operation, and servicing activities collectively referred to as the “Improvements.”:
Street Lighting
Street Trees and Other Landscaping
2.1 Description of Boundaries of the District
The Assessment Diagram showing the boundaries of the District can be found in Section 8.
2.2 Description of Improvements and Services
A general illustration of the location of the landscaping and lighting Improvements is shown below.
For illustration purposes only, not an official map.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 6
2.2.1 STREET LIGHTING
The Improvements include the maintenance, operation, and servicing of street lighting, including theme light poles, ornamental lighting and other appurtenant facilities in the public right of way areas throughout the boundary of the District, as identified in the above illustrative map. The Improvements are generally described as: maintenance, operation, and servicing of public street lighting facilities, including all works or improvements used or useful for the lighting of any public places, including ornamental standards, luminaires, poles, supports, tunnels, manholes, vaults, conduits, pipes, wires, conductors, guys, stubs, platforms, braces, transformers, insulators, contacts, switches, capacitors, meters, communication circuits, appliances, attachments, and appurtenances. Maintenance, operation, and servicing includes, but is not limited to, personnel, furnishing utilities, electrical energy and timing/switching, lamp changing, emergency services, pole painting, fixture cleaning, glassware replacement, and rehabilitation, which includes modernization and replacement of systems; repairs, including poles, conduit, wiring and fusing, and fixtures repair and replacement, contracting services and other items necessary for the satisfactory operation of these services. Currently, there are 70 total streetlights within the District and the general location of the Improvements within the District is shown in the illustration above.
2.2.2 STREET TREES AND OTHER LANDSCAPING
The Improvements include the maintenance, operation, and servicing of street trees and landscaping throughout the boundary of the District, as identified in the above illustrative map. The Improvements are generally described as: the maintenance, operation, and servicing of trees, landscape and appurtenant facilities in the public right of way areas, as well as open space, trails and green belt areas dispersed throughout the District. Eligible District costs may include, but are not limited to, personnel, furnishing electrical energy, utilities such as water and gas, materials, contracting services, and other items necessary for the satisfactory operation of these services described as follows:
The Improvements authorized to be maintained and serviced include, but are not limited to: groundcover, turf, trees, shrubs, planters, the landscaped areas and weed abatement of open spaces, and may also include sidewalk and hardscape improvements, entry monuments and associated appurtenant facilities.
There are approximately 365,228 square feet of landscape maintenance area and 651 street trees within the District. The general location of the Improvements within the District is described as follows:
1. Landscaping improvements on median islands and on both sides of Gateway Boulevard, Gateway Court, Maupin Lane, B. Gale Wilson Boulevard, B. Gale Wilson Drive, and Oxford Drive from the curb to the parking lot.
2. Landscaping improvements at various parking lot entryways.
3. Landscaping improvements along the perimeter of district boundaries except for the landscaping improvements located along the southern and eastern district boundaries beginning approximately 150 feet east of the Travis Boulevard and Gateway Boulevard intersection to approximately 150 feet south of the Pennsylvania Avenue and Gateway Boulevard intersection.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 7
3. ESTIMATE OF COSTS
3.1 Improvement Costs
The following table summarizes the estimated annual costs to fund the Improvements for Fiscal Year 2025/26:
Description Amount (1)
Landscaping and Street Trees
Landscape Maintenance $183,842
Landscape Maintenance – City Staff 27,518
Tree Maintenance 40,288
Irrigation 100,000
Contingency 28,384
Reserves 28,384
Subtotal Landscaping: $408,416
Street Lighting
Streetlight Maintenance 1,803
Electricity 8,400
Contingency 1,020
Reserves 1,020
Subtotal Street Lighting: $12,243
Administration
City Staff Costs $8,055
County Fees 3,600
Engineer/Consultant Costs 5,900
Noticing 515
Subtotal Administration $18,070
Total Cost of Improvements $438,729
Less General Benefit Portion (Lighting – 15.86%) (1,942) Less General Benefit Portion (Landscaping – 21.48%) (87,728) Total Cost of Improvements to Be Assessed $349,059
Total Special Benefit Points (2) 472
Maximum Rate Per Special Benefit Point - FY 2025/26 (3) Lighting $45.9651
Landscaping $1,460.8738
Assessed Rate Per Special Benefit Point - FY 2025/26
Lighting $45.8778
Landscaping $1,433.1878
(1) Slight variances may occur due to rounding.
(2) Total Benefit Points for each Lighting and Landscaping. (3) Refer to Section 6.6 for inflator information.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 8
3.2 Fiscal Year 2025/26 Assessment
The following table breaks down the estimated annual costs from above for Fiscal Year 2025/26 by Improvement type. The Landscaping and Lighting Budget, the Percent of Budget and the General Benefit Percentages by Improvement type utilized in the table below have been rounded. The final assessment rates listed in Section 9 have been truncated to two decimal places.
Description
Landscaping &
Lighting Budget
% of
Budget
Special
Benefit(1)
Admin
Budget (2)
Total to be
Assessed
Special
Benefit
Points (SBP)
Rate per
SBP
Lighting Budget $12,243 2.91% $10,301 $526 $10,827 236 $45.8778 Landscaping Budget 408,416 97.09% 320,688 17,544 338,232 236 1,433.1878 Total $420,659 $330,990 $18,070 $349,059
(1) See Section 5 for Quantification of Special Benefit. (2) Includes County fees, Engineer/Consultant costs and City staff costs. Equals (Total Admin Budget x % of Budget).
Slight variances may occur due to rounding.
3.3 Fund Balance
It is the intent of the City to maintain a Fund Balance which shall not exceed the estimated costs of maintenance and servicing of the Improvements prior to December 10 of the fiscal year, or when the City expects to receive its apportionment of special assessments and tax collections from the County, whichever is later.
The reserve balance information for the District is as follows:
Estimated Fiscal Year Ending June 30, 2025 Fund Balance $243,120 Fund Balance Contribution – Fiscal Year 2025/26
Tree Maintenance $0
Lighting 0
Landscaping 0
Fund Balance Collection – Fiscal Year 2025/26 (1)
Tree Maintenance $40,287
Lighting 1,020
Landscaping 28,384
Interest Earnings 2,431
Estimated Fiscal Year Ending June 30, 2026 Fund Balance $315,242 (1) The City will continue to collect reserves until it has accumulated fund balance in the amount equal to the cost of maintenance and servicing of the Improvements through the County of Solano’s apportionment of special assessments.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 9
4. BENEFITS FROM IMPROVEMENTS
The Improvements will confer special benefits upon certain parcels within the District. These special benefits created by the Improvements are summarized in the table below:
Improvement Benefit(s)
Street Lighting Improved Safety
Improved Accessibility
Street Trees and Other Landscaping Improved Aesthetics
Increased Economic Activity
The special benefits to be conferred by the Improvements are detailed below.
4.1 Street Lighting
4.1.1 IMPROVED SAFETY AND ACCESSIBILITY
The street lighting Improvements will confer safety benefits to assessable parcels in close proximity to lighting. This benefit extends to property, as adequate lighting should decrease vandalism and other property-related crime. As noted in one report, “Published studies having different methodologies tend to converge on an overall average reported 20% to 30% reduction in nighttime crash risk from lighting” (National Cooperative Highway Research Program Transportation Research Board of The National Academies, 2009). The same report also states, “… lighting has a positive effect on reducing crime ...” The Improvements will also provide improved safety benefits by facilitating a more efficient and safer flow of traffic to and from properties within the District between the dusk and dawn hours. It is a well-accepted fact that pedestrian and traffic safety is considerably reduced in the hours of darkness between dusk and dawn. Various studies have concluded that good quality street lighting reduces the accident rate by increasing the overall visibility, as vehicle headlights are inadequate for high-speed traffic. For example, “Driving outside of daylight hours is more dangerous – only a quarter of all travel by car drivers is between the hours of 7pm and 8am, yet this period accounts for 40% of fatal and serious injuries in the same group.” (Night-time accidents: a scoping study, UCL, London, 2009). Additionally, “… installing road lighting in a previously unlit road led to a rate ratio of 0.45 (95% confidence interval 0.29 to 0.69), which implies a 55% reduction in crashes compared to that in the control area.” (Street lighting for preventing road traffic injuries, Cochrane Database of Systematic Reviews, 2009) Therefore, the street lighting Improvements will confer safety benefits to property within the District and each assessable property will be assessed for its proportional special benefit.
The street lighting Improvements will also provide improved accessibility benefits to assessable parcels where street lighting is provided along the access route. The usefulness of a parcel cannot be realized unless it is accessible. Thus, improving the accessibility of a parcel through proper street lighting can improve its utilization. The street lighting Improvements will help improve access for emergency response vehicles as well. Efficient and timely response to emergencies is a critical component to the effectiveness of emergency response. It is reasonable to conclude that the maintenance, operation and servicing of street lighting will
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 10 improve emergency response efficiency in the District. Therefore, the street lighting Improvements will confer accessibility benefits.
4.2 Street Trees and Other Landscaping
4.2.1 IMPROVED AESTHETICS AND INCREASED ECONOMIC ACTIVITY The aesthetic benefit relates to the increase in the overall aesthetics as a result of the ongoing maintenance, operation, and servicing of the street trees and other landscaping within the District.
Specifically, the street trees and other landscaping are believed to create a more beautiful, aesthetically pleasing environment within the District and they enhance the overall image and desirability of the properties within the District. A study by the University of Georgia found "People’s preferences for locating areas of social interactions in calming, beautiful, and nature-dominated areas revolve around the presence of community trees and forests" (Coder, 1996). The same study noted “Large old street trees were found to be the most important indicator of attractiveness in a community” (Coder).
Conversely, "appeal decreases when Improvements are not well-maintained, unsafe, or destroyed by vandalism” (The Victoria Transportation Institute, 2011). Streetscapes have a significant effect on how people view and interact with their community. With streetscapes that are safe and inviting, people are more likely to walk, which can help reduce automobile traffic, improve public health, stimulate local economic activity and attract residents and visitors to the community. Therefore, the street trees and other landscaping Improvements will confer aesthetic benefits to properties in close proximity.
The street trees and other landscaping Improvements that confer aesthetic benefits will concurrently confer economic activity benefits as well. The Improvements will create a well-maintained and clean environment that is aesthetically pleasing, which has been shown to “increase consumer’s intentions to spend money” (Vilnai-Yavetz 2010). Additionally, "in contrast to areas without trees, shoppers indicated that they shop more often and longer in well-landscaped business districts and were willing to pay more for goods and services” according to the Pennsylvania Landscape & Nursey Association. Therefore, the Improvements will also confer economic activity benefits to properties in close proximity.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 11
5. QUANTIFICATION OF BENEFIT
As described in the Introduction, only special benefits are assessable and in order to assess only special benefits, the general benefits resulting from the Improvements must be separated and quantified. This section describes the process used to separate and quantify the general benefits.
5.1 Summary
As detailed below, it is estimated the Improvements will confer an Overall General Benefit of 37.34%.
5.2 General Benefit Analysis
5.2.1 GENERAL BENEFIT: VEHICLES PASSING THROUGH THE DISTRICT Traffic volume is utilized to help determine special benefits accruing to the District as opposed to the general benefits received by the public at large from the Improvements. As a result of the Improvements, there will be a level of general benefit conferred to pass-through vehicle traffic related to properties outside of the District whose occupants do not intend to access property within the District. As such, the benefit derived by pass-through vehicle traffic needs to be quantified. The percentage of pass-through vehicle traffic is calculated by comparing the estimated daily District generated vehicle trips to the total roadway design capacity, as detailed below.
In order to determine the average daily trips generated by parcels located within the District, the Institute of Transportation Engineer’s (ITE) Trip Generation Handbook was utilized to estimate the average daily trip counts by land use classification for each parcel. Per the ITE Trip Generation User’s Guide, a “Trip” is defined as a “single or one-direction vehicle movement with either the origin or the destination (exiting and entering) inside a study site. For trip generation purposes, the total trips for a land use over a given period of time are the total of all trips entering plus all trips exiting a site during a designated time period.” The ADT rates used in this analysis are shown in the table below and came from ITE Trip Generation Manual (11th Edition). Any future changes to land use classifications resulting in changes to a parcel’s ADT rates will be based on the values found in the 11th Edition of the ITE Trip Generation Manual.
Land Use
Classification
Institute of Transportation
Engineer’s (ITE) Value(s)
Average
Daily Trip
Rate Rate Per
Total
Parcels/
Units
Estimated
Daily District
Vehicle Trips
Commercial 310 – Hotel 7.99 Room 1 1,198.50
Commercial 435 – Multi-Purpose
Recreational Facility 3.58 1,000 sq. ft. GFA 1 119.06
Commercial 630 – Clinic 37.6 1,000 sq. ft. GFA 1 2,028.90 Commercial 820 – Shopping Center 37.01 1,000 sq. ft. GFA 39 55,114.70 Commercial 945 – Convenience
Store/Gas Station 265.12 Vehicle Fueling
Stations 1 2,386.08
Total: 60,847.24
Roadway design capacity is a critical element that affects trip distribution and was utilized in this analysis to estimate the number of daily vehicle trips passing through the District. From a visual inspection of the
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 12 District, the primary higher functional classification roadways serving the District parcels are Travis Boulevard, Gateway Boulevard, and Pennsylvania Avenue. Roadway design capacities, as defined in the City of Fairfield’s Travel Demand Forecasting Model, were estimated based on the functional classification of the roadway, the number of lanes, and the City’s minimum recommended Level of Service “C” (City of Fairfield Design, Construction and Materials Specification Handbook 2020). Roadway design capacity was calculated for the higher functional classification roadways (henceforth referred to as the “Major Roads”) identified above in order to estimate the total daily traffic flow through the District.
Using the methodology described above, the estimated pass-through vehicular traffic through the District is 67.50% as summarized in the table below:
Average Vehicle Trips
Through District
Estimated District
Generated Vehicle Trips
Estimated Pass Through
Vehicle Traffic
Pass Through
%
187,200 (1) - 60,847.24 = 126,352.76 67.50%
(1) Equals the design capacity of each roadway, reduced by 25% to recognize the City’s recommended “C” Level of Service. Breakdown by street name below.
The table below separates the weighted vehicular pass-through percentage factors by street name for the Major Roads traversing the District.
Street Name Vehicle Trips Passing-Through District
% of Total
Roadway Design
Capacity (1)
Weighted Vehicle
Pass-Through %
Factor (2)
Travis Boulevard 86,400 46.15% 31.15%
Gateway Boulevard 50,400 26.92% 18.17%
Pennsylvania Avenue 50,400 26.92% 18.17%
Total: 187,200 100.00% 67.50%
(1) Equals (Vehicle Trips Passing Through District on Roadway / Total Vehicle Trips Passing Through District). (2) Equals (% of Total Roadway Design Capacity x Pass Through %).
However, simply estimating the number of pass-through vehicle does not necessarily indicate the level of benefit accruing to vehicles passing through the District. We must look at each of the Improvements individually.
5.2.2 GENERAL BENEFIT: STREET LIGHTING
Certain streetlights to be funded by the assessment are on the Major Roads identified in Section 5.2.1.
Accordingly, some of the safety and access benefits will be conferred to vehicles that are just passing through the District. An analysis of the streetlights was prepared comparing the number of streetlights located on the Major Roads to the total number of streetlights within the District.
The street lighting Improvements are located along Gateway Boulevard, Pennsylvania Avenue, and throughout many of the other streets within the District. There are no streetlights located along Interstate 80, therefore there is no general or special benefit conferred by the street lighting Improvements along Interstate 80. The trips generated by the property within the District was taken as a percent of the total traffic on the Major Roads.
Although interior streets are intended to serve the interior parcels, one could imagine a small degree of “tourism” wherein drivers are in fact simply “passing through” to enjoy the views, the natural surroundings
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 13 or perhaps lost on their way to their intended destination. As such, approximately 2% is attributable to vehicles passing through on interior streets.
As summarized in the table below, the Effective General Benefit percentage from the Street Lighting Improvements is 15.86%.
Roadways with Streetlights
Number of
Streetlights
% of
Streetlights
Weighted Vehicle Pass-
Through % Factor
Effective General
Benefit % (1)
Gateway Boulevard 59 84.29% 18.17% 15.32%
Pennsylvania Avenue 1 1.43% 18.17% 0.26%
Interior Lights 10 14.29% 2.00% 0.29%
Total: 70 15.86 (2)
(1) Equals (% of Streetlights x Pass-Through Percentage). (2) Slight variances may occur due to rounding.
5.2.3 GENERAL BENEFIT: STREET TREES AND OTHER LANDSCAPING Certain street trees and other landscaping to be funded by the assessment are on the Major Roads as described previously. Accordingly, some of the aesthetic and economic activity benefits will be conferred to traffic passing through the District. An analysis of the street trees and landscaping areas within the District was conducted and whenever street trees and landscaping areas were located within close proximity to the Major Roads, those trees were considered as belonging to the Major Roads.
The landscaping Improvements are located along Travis Boulevard, Gateway Boulevard, Pennsylvania Avenue, and throughout the District. In order to quantify the General Benefits conferred by the landscaping Improvements, the total linear length of the Improvements were utilized. Interstate 80 does not provide direct access to the District, however drivers traveling eastbound on Interstate 80 receive benefits from the landscaping Improvements, therefore 100% of the linear length bordering the Improvements is recognized as pass-through traffic for the General Benefit analysis.
As mentioned above, although interior streets are intended to serve individual neighborhoods, one could imagine a small degree of “tourism” wherein drivers are in fact simply “passing through” to enjoy the views and the natural surroundings, or perhaps lost on their way to their intended destination. As such, approximately 2% is attributable to vehicles passing through on interior streets.
As summarized in the table below, the Effective General Benefit percentage from the Landscaping Improvements is 21.48%.
Roadways with Landscaping
Improvements
Feet of Roadway
with
Landscaping
Improvements
% of Total
Landscaping
Improvements (1)
Weighted
Vehicle Pass-
Through %
Factor
Effective
General
Benefit % (2)
Travis Boulevard 2,908 12.59% 31.15% 3.92%
Gateway Boulevard 3,688 15.97% 18.17% 2.90%
Pennsylvania Avenue 2,447 10.59% 18.17% 1.93%
Interstate 80 2,713 11.74% 100.00% 11.74%
Interior Streets 11,341 49.10% 2.00% 0.98%
Total: 23,097 21.48%
(1) Equals (Feet of Roadway with Landscaping Improvements / 23,097). (2) Equals (% of Total Landscaping Improvements x Weighted Vehicle Pass-Through % Factor).
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 14
5.2.4 OVERALL GENERAL BENEFIT
In order to determine an overall general benefit percentage to apply to the District, it is necessary to combine the separately analyzed components of each of the general benefits described above. As the benefits conferred by the streetlight Improvements and by Street Trees and Other Landscaping Improvements are independent of each other, it is appropriate to combine the individual general benefit percentages to determine a cumulative Overall General Benefit. The table below is a summary of the Overall General Benefit for the District.
General Benefit Category
General
Benefit %
Street Lighting 15.86%
Street Trees and Other Landscaping 21.48%
Overall General Benefit: 37.34%
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 15
6. METHOD OF APPORTIONMENT
Once special benefits are identified, they must be assigned based on the estimated proportionate special benefit derived by each parcel. This section describes the assignment of special benefit to each parcel.
6.1 Parcel Characteristics
The following parcel characteristics are used to determine each parcel’s proportionate special benefit:
Building Square Footage
Lot Square Footage
Average Daily Trip Generation
Differing levels of special benefit can largely be attributed to differences in building size, lot size, and trip generation associated with land use. As building size, lot size and average daily trip generation increase, parcels are considered to receive proportionately greater special benefit. For example, assuming all other factors are equal, a parcel with a large building will experience greater special benefit than a parcel with a small building. Therefore, these three parcel characteristics are deemed appropriate factors for determining proportional special benefit.
In order to relate differing parcel characteristics to one another, a relative factor is determined for each of the three parcel characteristics. The calculation methodology for the building factor, lot factor and average daily trip factor are described below.
6.1.1 BUILDING FACTOR
The average building size for all assessable parcels within the District is approximately 44,043.55 square feet. Each assessable parcel’s actual building size was divided by the District’s average building size to determine a Building Factor.
Parcel's Building
Square Feet / District's Average
Building Square Feet = Parcel's
Building Factor
6.1.2 LOT FACTOR
The average lot size for all assessable parcels within the District is approximately 130,457.77 square feet.
Each assessable parcel’s actual lot square footage was divided by the District’s average lot square footage to determine a Lot Factor.
Parcel's Lot
Square Feet / District's Average
Lot Square Feet = Parcel's
Lot Factor
6.1.3 ADT FACTOR
The average daily trip (ADT) count for all assessable parcels within the District is 1,644.52 trips. Each assessable parcel’s ADT was divided by the District’s ADT to determine the parcel’s ADT factor.
Parcel's
Trips / District's Average Trips = Parcel's
ADT Factor
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 16 Assessable parcels were assigned trip generation rates by land use classification in accordance with the Institute for Transportation Engineers (ITE) Trip Generation Manual (11th Edition). Per the ITE Trip Generation User’s Guide, a “Trip” is defined as a “single or one-direction vehicle movement with either the origin or the destination (exiting and entering) inside a study site. For trip generation purposes, the total number of trips for a land use over a given period of time are the total of all trips entering plus all trips exiting a site during a designated time period.”
The ADT rates used in this analysis are shown in the table below. ADT rates came from the ITE Trip Generation Manual (11th Edition), unless otherwise noted. For land uses with multiple ITE Codes, an average trip value was used for the ADT rate. Only those land use classifications currently being assessed at the time of preparation of this report are included below. Any future changes to a parcel’s land use classification resulting in changes to the parcel’s ADT rates will be based on the values found in the 11th Edition of the ITE Trip Generation Manual.
Land Use Classification
Institute of Transportation
Engineer’s (ITE) Value(s)
Average Daily
Trip (ADT) Rate
ADT
Rate Per
Commercial 310 – Hotel 7.99 Room
Commercial 435 – Multi-Purpose
Recreational Facility 3.58 1,000 sq. ft. GFA
Commercial 630 – Clinic 37.6 1,000 sq. ft. GFA
Commercial 820 – Shopping Center 37.01 1,000 sq. ft. GFA Commercial 945 – Convenience
Store/Gas Station 265.12 Vehicle Fueling
Stations
6.2 Land Use
In addition to building size, lot size and average daily trip generation a parcel’s land use will also affect the special benefits received. Following the calculation of each parcel’s characteristic factors in Section 6.1 above, Land Use Benefit Points were assigned. These benefit points correspond to the special benefits described in the Quantification of Benefit section of this report.
Each parcel within the proposed District boundary is assigned a land use classification for purposes of determining the special benefits received. Below is a description of the land use classifications to be assessed within the District. Not all land use classifications below are currently within the District.
Commercial Property consists of parcels used for commercial, for-profit or non-profit purposes including, but not limited to, retail, offices, restaurants, commercial garages, private schools, hotels/motels, medical/dental offices, and privately-owned pay-to-use parking lots and structures.
Multi-Family Residential Property consists of parcels that are duplexes, triplexes, fourplexes, and condominiums used exclusively for residential purposes.
Park Property consists of certain park parcels that are not being maintained by the District or included as part of the District Improvements.
Public Property consists of parcels used for public purposes including, golf courses, police and fire stations, public schools, libraries, and other government administration buildings.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 17 Single Family Residential Property consists of parcels that have stand-alone residential dwelling units with their own lots intended for one family.
Undeveloped Property consists of parcels with no structure value.
There are currently a total of 43 assessable parcels within the District.
6.2.1 APPORTIONING SAFETY AND ACCESSIBILITY BENEFIT
The Safety and Accessibility Benefits conferred by the Improvements will specially benefit all assessable land use classifications. Safety can be thought of as a universal need. Its importance can be seen in the fact that everyone desires to live and work in safe, crime-free areas (Lau Leby 2010). Therefore, because levels of safety affect all land uses, it follows that an increase in safety will specially benefit all land use classifications. Additionally, as noted in Section 4.1, the usefulness of a parcel cannot be realized unless it is accessible. As the street lighting Improvements allow for increased visibility around assessed parcels and easier access to properties throughout the District, these benefits are also not restricted to a particular land use.
However, due to their limited activity during the dusk to dawn hours, Park, Public and Undeveloped land use classifications will not experience the same level of safety and accessibility benefits compared to other land use classifications. For example, Park, Public and Undeveloped land use classifications experience limited activities during the evening hours when the greatest safety benefit from street lighting is received.
However, it is recognized that a visible and well-lit property, especially during the nighttime hours, will aid in deterring dumping and other illegal activities, such as property-related crime and will allow for access in case of an emergency. To account for this limited special benefit, Park and Public land use classifications are assigned a benefit point of 0.50 and Undeveloped land use classifications are assigned a benefit point of
0.25 for Safety and Accessibility. All other land use classifications will be assigned 1 Safety and Accessibility Benefit Point.
Additionally, all land use classifications located in proximity to interior street lighting will experience a greater level of safety and accessibility benefits compared to other land use classifications due to the benefit of the parcel being located adjacent to interior street lighting. To account for this added benefit, parcels designated with the Interior Lighting land use classification are assigned double the benefit points for Safety and Accessibility, for example Public (Interior Lighting) land use classifications are assigned a benefit point of 1 and Undeveloped (Interior Lighting) land use classifications are assigned a benefit point of
0.50 for Safety and Accessibility. The table provided in Section 6.2.4 of this Report provides a summary of the land use benefit points assigned to the assessable land use classifications within the District.
After the land use benefit points have been assigned by land use classifications within the District, improved safety and accessibility from street lighting, as property-related benefits, can be measured by the characteristics of a parcel, namely the size of a building, its lot size, and daily trip generation. Parcels with larger building and lot sizes and parcels with greater intensity of use, measured by trip generation, will experience the Safety and Accessibility Benefits to a greater degree than smaller, less-utilized parcels.
Therefore, the Lot Factor, Building Factor and ADT factor are used to measure Safety and Accessibility Benefits. The calculation of Total Special Benefit Points for each parcel is detailed in Section 6.3 of this Report.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 18
6.2.2 APPORTIONING AESTHETIC BENEFIT
The Aesthetic Benefits conferred by the Improvements will specially benefit all assessable land use classifications. The benefit of visual appeal is not restricted to a particular land use. A more attractive public environment specially benefits all parcels irrespective of land use. Accordingly, each assessable land use classification will be assigned one Aesthetic Benefit Point. However, Undeveloped land use classifications will be assigned 0.25 Aesthetic Benefit Point due to the nature of the land use. Per the definition in Section 4.2.1, “the street trees and other landscaping are believed to create a more beautiful, aesthetically pleasing environment within the District and they enhance the overall image and desirability of the properties within the District.” As such, there is some aesthetic benefit conferred by the Improvements on undeveloped land use classifications. However, this benefit is limited, as undeveloped parcels are not utilized as areas recognized in the definition of aesthetic benefit of social interactions, areas where residents are likely to walk, areas of stimulated economic activity or locations that will attract residents and/or visitors to the community. Therefore, the undeveloped land use classifications are assigned the reduced 0.25 Aesthetic Benefit Points due to the nature of the land use compared to the developed land use classifications. The table provided in Section 6.2.4 of this Report provides a summary of the land use benefit points assigned to the assessable land use classifications within the District.
After the land use benefit points have been assigned by land use classifications within the District, improved aesthetics from tree and landscaping Improvements, as property-related benefits, can be measured by the characteristics of a parcel, namely the size of a building, its lot size, and daily trip generation. Parcels with larger building and lot sizes and parcels with greater intensity of use, measured by trip generation, will experience the Aesthetic Benefits to a greater degree than smaller, less-developed parcels. Therefore, the Lot Factor, Building Factor and ADT Factor are used to measure Aesthetic Benefits.
The calculation of Total Special Benefit Points for each parcel is detailed in Section 6.3 of this report.
6.2.3 APPORTIONING ECONOMIC ACTIVITY BENEFIT
The Economic Activity Benefits conferred by the Improvements will specially benefit all assessable land use classifications. Street trees and landscaping add value in many ways. They increase the social value of the City by making places more pleasing to people on foot and in cars and they also add great environmental benefits, which fuel economic benefits. The research has demonstrated that consumers will shop more often and for longer durations in well-landscaped business districts. The research also indicates that shoppers are willing to pay more money for goods and services in well-landscaped business districts.
Accordingly, each assessable land use classification will be assigned one Economic Activity Benefit Point.
The table provided in Section 6.2.4 of this Report provides a summary of the land use benefit points assigned to the assessable land use classifications within the District.
After the land use benefit points have been assigned by land use classifications within the District, improved economic activity from tree and landscaping Improvements, as a property related benefit, can be measured by the characteristics of a parcel, namely the size of a building, its size, and trip generation.
Parcels with larger building and lot sizes and parcels with greater intensity of use, measured by trip generation, will experience the Economic Activity Benefits to a greater degree than smaller, less-developed parcels. Therefore, the Lot Factor, Building Factor and ADT Factor are used to measure Economic Activity Benefits. The calculation of Total Special Benefit Points for each parcel is detailed in Section 6.3 of this report.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 19
6.2.4 LAND USE BENEFIT POINTS
The tables below summarize the Land Use Benefit Points assigned to the various assessable land use classifications within the District:
Street Lighting
Land Use Classification Per Safety Accessibility
Total Street
Lighting Land Use
Benefit Points
Single Family Residential Parcel 1 1 2
Single Family Residential (Interior Lighting) Parcel 2 2 4 Multi-Family Residential Parcel 1 1 2
Multi-Family Residential (Interior Lighting) Parcel 2 2 4 Commercial Parcel 1 1 2
Commercial (Interior Lighting) Parcel 2 2 4
Park Parcel 0.50 0.50 1
Park (Interior Lighting) Parcel 1.00 1.00 2
Public Parcel 0.50 0.50 1
Public (Interior Lighting) Parcel 1 1 2
Undeveloped Parcel 0.25 0.25 0.50
Undeveloped (Interior Lighting) Parcel 0.50 0.50 1
Street Trees and Other Landscaping
Land Use Classification Per Aesthetic Economic Activity Total Landscaping
Land Use Benefit
Points
Single Family Residential Parcel 1 1 2
Multi-Family Residential Parcel 1 1 2
Commercial Parcel 1 1 2
Park Parcel 1 1 2
Public Parcel 0.50 0.50 1
Undeveloped Parcel 0.25 0.25 0.50
6.3 Total Special Benefit Points
The calculation of Total Special Benefit Points for each parcel takes into account each component analyzed and described above, parcel characteristics and land use classification. The formula for determining each parcel’s Total Benefit Points is as follows:
( Building
Factor + Lot
Factor + ADT
Factor ) x
Street Lighting
Land Use Benefit
Points =
Total Street
Lighting Special
Benefit Points
( Building
Factor + Lot
Factor + ADT
Factor ) x
Landscaping Land
Use Benefit
Points
=
Total
Landscaping
Special
Benefit Points
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 20
The Total Special Benefit Points by Improvement type are computed for each parcel in the District and summed. The Total District Special Benefit Points are 472.00. These Total District Special Benefit Points are used to determine the proposed assessment amounts on each parcel.
6.4 Amount to Be Assessed
The total maximum amount to be assessed upon the assessable parcels is the total cost of the Improvements, as detailed above, less the portion of costs attributable to General Benefit as detailed in the Quantification of Benefit section.
The calculation of the balance to be assessed is shown below:
Description Amount
Total Cost of Improvements $438,729
Less General Benefit Portion (Lighting – 15.86%) (1,942) Less General Benefit Portion (Landscaping – 21.48%) (87,728) Total Cost of Improvements to Be Assessed $349,059(1)
(1) Slight variances may occur due to rounding. The final assessment rates in Section 9 have been truncated to two decimal places.
6.5 FY 2025/26 Assessment Rate per Special Benefit Point for Each Improvement Type
The Maximum Assessment Rate per Special Benefit Point is calculated by dividing the total costs to be Assessed by the total Special Benefit Points assigned to the parcels within the District for each Improvement type. The following formula provides the assessment rate per Special Benefit Point for each Improvement type.
Total Street Lighting Costs to be Assessed / Total Street Lighting Special Benefit Points = ($10,827.17) (236.00)
Assessment Rate per Street Lighting Special Benefit Point ($45.8778)
Total Landscaping Costs to be Assessed / Total Landscaping Special Benefit Points = ($338,232.32) (236.00)
Assessment Rate per Landscaping Special Benefit Point
($1,433.1878)
The Maximum Assessment Rate per Special Benefit Point for each Improvement type is then multiplied by each parcel’s total special benefit points to determine the maximum assessment amount per parcel.
6.6 Annual Maximum Assessment Rate Inflation for Each Improvement Type Each parcel’s maximum assessment for an Improvement type is determined by multiplying the maximum assessment rate per special benefit point by the parcel’s total special benefit points. If the total special benefit points for all assessable parcels in the District change in future years, the maximum allowable
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 21 annual assessment rate per special benefit point will not be recalculated. The maximum allowable annual assessment rate per special benefit point, plus the annual cost of living inflator, will remain fixed. The actual annual assessment rate per special benefit point will be calculated by dividing the fiscal year’s total cost of Improvements to be assessed by the total special benefit points, not to exceed the maximum allowable annual assessment rate per special benefit point for that fiscal year. The maximum allowable assessment rate per special benefit point is escalated each year on July 1 by the annual change in the February to February Consumer Price Index for all Urban Consumers, for the San Francisco-Oakland- Hayward CA region, not to exceed 3% annually, beginning July 1, 2024.
In any given year, the assessments may be at any rate sufficient to meet the estimated budget and levied without undertaking an assessment ballot proceeding, as long as the actual assessment rate per special benefit point does not exceed the Maximum Assessment Rate per special benefit point for that fiscal year.
If the change in CPI effective for any fiscal year is determined to be negative, the maximum assessment rate will remain unchanged from the previous fiscal year. The actual assessment rate may vary from year to year but will be no higher than the maximum rate.
The following table details the historical maximum assessment rates per benefit point:
Fiscal Year CPI
Lighting Maximum
Assessment Rate Per
Benefit Point
Lighting Maximum
Assessment Rate Per
Benefit Point
2023/24 N/A $43.7268 $1,389.7368
2024/25 2.366% 44.7614 1,422.6200
2025/26 2.689% 45.9651 1,460.8738
Slight variances may occur due to rounding.
6.7 Future Changes to Parcel Characteristics
Future changes to any of the parcel characteristics detailed in Section 6 will cause possible changes in the total assessment revenue. The assessment revenue for any given year will be the product of the District’s parcel characteristics, special benefit points and the budget in effect for such fiscal year. Development within the District that increases the overall building square footage, for example, will lead to possible increased assessment revenue, even if the assessment rate per special benefit point is not increased. By way of example, when a previously undeveloped parcel develops into a commercial land use classification, the parcel will no longer be assessed as an undeveloped land use, but rather as a commercial parcel with the updated parcel characteristics.
6.8 Data for Annual Assessment Calculations
Each year, as part of the assessment calculation procedures, the City or its designated consultant shall determine the land use classification for each parcel based on the County Assessor's use code or other supplementary information made available and deemed reliable. The parcel characteristics of building square footage and lot square footage shall similarly be based on the County Assessor's secured roll data for the applicable tax year and may be supplemented with other reliable data sources, such as County Assessor's parcel maps and GIS data.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 22 Assessment amounts for each parcel may change over time in accordance with changes to parcel characteristics including land use classification, building square footage, lot square footage and average daily trip generation.
6.9 Appeals
If any property owner believes the data used to calculate the assessment is inaccurate for any reason, the property owner shall submit, in writing, a request for review to the City. The property owner shall provide documentation to support the request for review. The City or its designated consultant shall review the request and provide a response to the property owner. The property owner must be current in the payment of all assessments when filing the request for review and must remain current during the review process.
If the review conducted by the City or its designated consultant results in the approval for changes to any parcel characteristics used to compute the assessment, the City or its designated consultant shall recalculate the assessment. When recalculating the assessment, the assessment rates actually applied in such fiscal year shall be used. Only the assessment for the parcel or parcels subject to review shall be recalculated.
If the recalculated assessment for the parcel or parcels being reviewed is less than the amount submitted to the County on the secured property tax roll, the difference shall be credited back to the property owner in a manner approved by the City. This credit shall be limited to the current fiscal year and the prior fiscal year, if applicable. The “fiscal year” shall follow the County’s fiscal year for property taxes, from July 1 to June 30. The applicable fiscal year shall be determined by the date the request for review is submitted to the City.
The credit may be provided in the form of a check issued to the property owner, an adjustment to the current year’s property tax roll (if possible), or a credit to the succeeding year’s assessment thereby reducing the amount placed on the secured property tax roll for such year.
If the recalculated assessment is greater than the amount submitted to the County on the secured property tax roll, the City or its designated consultant shall apply the recalculated assessment to the succeeding year’s property tax roll and no adjustments shall be made to the prior or current fiscal years’ assessments.
In any dispute over parcel characteristic data used to compute assessments, the City Manager (or his/her designee) shall make a conclusive determination and its decision shall be final.
6.10 Method of Collection
The assessments will be collected annually on the Solano County secured property tax roll. The assessments will be subject to the County’s assigned due dates and late penalties. However, the City Manager (or his/her designee) may choose to collect the assessments in an alternate manner (including directly billing the property owner) as may be deemed appropriate or necessary by the City or as allowed by law.
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 23
7. ENGINEER’S STATEMENT
The City of Fairfield Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) assessments described in this Report have been prepared pursuant to Article XIII D of the California Constitution. In preparing these assessments:
1. I have identified all parcels that will have a special benefit conferred upon them by the Improvements described in Section 2 of this Report (the “Specially Benefited Parcels”). a. For particulars as to the identification of these parcels, reference is made to the Assessment Diagram, a copy of which is included in Section 8 of this Report.
2. I have assessed the estimated costs and expenses of the Improvements upon the Specially Benefited Parcels. In making such assessment:
a. The proportionate special benefit derived from the Improvements by each Specially Benefited Parcel was determined in relationship to the entirety of the cost of the Improvements;
b. No assessment has been imposed on any Specially Benefited Parcel which exceeds the reasonable cost of the proportional special benefit conferred on such parcel by the Improvements; and
c. The general benefits have been separated from the special benefits and only special benefits have been assessed.
I, the undersigned, respectfully submit this Engineer’s Report and, to the best of my knowledge, information and belief, this Report, the assessments, and the Assessment Diagram herein have been prepared and computed in accordance with the 1972 Act.
By:
John G. Egan
Assessment Engineer
R.C.E. 14853
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 24
8. ASSESSMENT DIAGRAM
The following pages contain the assessment diagram for the District. The lines and dimensions of each lot or parcel within the District are those lines and dimensions shown on the maps of the County Assessor of the County of Solano, at the time this Engineer’s Report was prepared, and are incorporated by reference herein and made part of this report.
Source: Solano County GIS
Geographic Coordinate Reference: GCS North American 1983 Projection: NAD 1983 StatePlane California II FIPS 0402 Feet Sheet 1 of 1
C I T Y O F F A I R F I E L DC I T Y O F F A I R F I E L D
CITY OF FAIRFIELD
COUNTY OF SOLANO
STATE OF CALIFORNIA
CITY OF FAIRFIELD
LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT
NO. 2023-1 (GATEWAY)
FILED IN THE OFFICE OF THE CITY CLERK OF THE CITY OF FAIRFIELD, STATE OF CALIFORNIA, THIS _____ DAY OF __________, 202__.
___________________________________________
CITY CLERK
CITY OF FAIRFIELD
THE LINES AND DIMENSIONS OF EACH LOT OR PARCEL SHOWN ON THIS DIAGRAM SHALL BE THOSE LINES AND DIMENSIONS AS SHOWN ON THE SOLANO COUNTY ASSESSOR’S MAPS FOR THOSE PARCELS LISTED.
FOR PARTICULARS OF THE LINES AND DIMENSIONS OF ASSESSOR PARCELS, REFERENCE IS MADE TO THE MAPS OF THE ASSESSOR, COUNTY OF SOLANO, STATE OF CALIFORNIA. THE SOLANO COUNTY ASSESSOR’S MAPS SHALL GOVERN FOR ALL DETAIL CONCERNING THE LINES AND DIMENSIONS OF SUCH LOTS OR PARCELS. 12 80
80 80
1212
80 Richards Ct
Gateway Ct
Gateway Ct
Kensington Dr
Gateway Bl
Gateway Bl
Webster St
B Gale Wilson Bl
Dana Dr
Travis Bl
Truman St
2nd St
Barton Pl
Barton Ct
Travis Bl
ClevelandCt
80 Oxford Dr
Kansas St
Montezuma Ct
Bristol Ln
Buckingham Dr
Markham Ct Arguello Ct
Victoria Ct
New Hampshire St
Hayes St
5th St
Cleveland St
Barton Dr
Holiday Ln
Alvarado Ct
Barbour Dr
London Ct
Wilkie St
Wallace St
Michigan St
London Ln
Winston Ct
Alford Dr
Larkin Dr
Harding St
Pennsylvania Av
Tabor Av
Roosevelt St
New Jersey St
Grant St
Minnesota St
1st St Tyler St
Van Buren St
Toland Dr
Westminster Dr
Kent Wy
Lincoln St
Pennsylvania Av
Pennsylvania Av
80 9
4 1
18 10
13 14
6 2
43 39
21 12
11 15
38 41
16 5
20 7
22 17
40 3
42 19
23 26
35 24
37 25
36 31
27 34
28 32
29 30
33 8
LLMD 2023-1 (Gateway) Boundary
LLMD 2023-1 (Gateway) Parcels
Parcels 0 350 700175 Feet
O
Air Base Pkwy
Walters Rd
LLMD 2023-1 (Gateway) Boundary
0 2.5 51.25 Miles
O
ID APN
1 0033-220-010
2 0033-220-020
3 0033-220-030
4 0033-220-040
5 0033-220-050
6 0033-220-070
7 0033-220-080
8 0033-220-110
9 0033-230-740
10 0033-230-750
11 0033-230-770
12 0033-230-780
13 0033-230-790
14 0033-230-800
15 0033-230-810
16 0033-230-820
17 0033-230-830
18 0033-230-840
19 0033-230-850
20 0033-230-870
21 0033-230-880
22 0033-230-890
23 0033-230-900
24 0033-240-010
25 0033-240-030
26 0033-240-040
27 0033-240-050
28 0033-240-070
29 0033-240-080
30 0033-240-100
31 0033-240-110
32 0033-240-120
33 0033-240-130
34 0033-240-140
35 0033-240-160
36 0033-240-170
37 0033-240-180
38 0033-250-010
39 0033-250-020
40 0033-250-030
41 0033-250-040
42 0033-250-050
43 0033-250-060
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 25
9. ASSESSMENT ROLL
Assessor’s parcel identification, for each lot or parcel subject to the assessment, shall be based on the County Assessor’s secured roll data for the applicable year in which this report is prepared. A listing of assessor’s parcels subject to the assessments for Fiscal Year 2025/26, along with the assessment amounts, is on file in the office of the City Clerk and incorporated herein by reference.
Based on County Assessor’s secured roll data, current assessor’s parcels, including corrected and/or new assessor’s parcels, will be submitted and/or resubmitted to the County Auditor/Controller. The annual assessment amount to be levied and collected for the resubmitted parcel(s) shall be determined in accordance with the method of apportionment and assessment rate approved in this Report. Therefore, if a single assessor’s parcel has a status change in development, other land use change, or subdivides into multiple assessor’s parcels, the assessment amounts applied to each of the new assessor’s parcels shall be recalculated and applied according to the approved method of apportionment and assessment rate rather than a proportionate share of the original assessment amount.
The following pages contain the proposed Fiscal Year 2025/26 assessment roll for the District.
City of Fairfield
Lighting Maintenance District No. 2023-1 (Gateway)
Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0033-220-010 1400 GATEWAY BLVD Commercial 13.30 $10,023.68 $9,838.92 0033-220-020 1350 GATEWAY BLVD Commercial 6.33 4,775.38 4,687.36 0033-220-030 1345 GATEWAY BLVD Commercial 1.48 1,117.78 1,097.16 0033-220-040 1315 GATEWAY BLVD Commercial 20.03 15,091.31 14,813.14 0033-220-050 1340 GATEWAY BLVD Commercial 2.20 1,659.59 1,628.98 0033-220-070 1310 GATEWAY BLVD Commercial 7.13 5,376.59 5,277.48 0033-220-080 1305 GATEWAY BLVD Commercial 3.68 2,777.68 2,726.48 0033-220-110 1300 GATEWAY BLVD Commercial 8.95 6,749.34 6,624.92 0033-230-740 1550 GATEWAY BLVD Commercial 20.81 15,681.82 15,392.76 0033-230-750 1560 GATEWAY BLVD Commercial 7.73 5,824.61 5,717.24 0033-230-770 1580 GATEWAY BLVD Commercial 17.28 13,025.82 12,785.72 0033-230-780 1586 GATEWAY BLVD Commercial 4.27 3,224.25 3,164.80 0033-230-790 1590 GATEWAY BLVD Commercial 9.72 7,328.43 7,193.34 0033-230-800 1600 GATEWAY BLVD Commercial 7.35 5,540.36 5,438.22 0033-230-810 1610 GATEWAY BLVD Commercial 4.09 3,088.26 3,031.32 0033-230-820 1650 GATEWAY BLVD Commercial 2.35 1,770.61 1,737.96 0033-230-830 1640 GATEWAY BLVD Commercial 2.36 1,779.35 1,746.54 0033-230-840 2200 GATEWAY CT Commercial 15.51 11,687.52 11,472.10 0033-230-850 Commercial 0.11 83.56 82.00
0033-230-870 1570 GATEWAY BLVD Commercial 2.28 1,717.93 1,686.24 0033-230-880 1574 GATEWAY BLVD Commercial 5.57 4,198.55 4,121.16 0033-230-890 Commercial 0.43 324.61 318.62
0033-230-900 Commercial 0.12 94.71 92.96
0033-240-010 1300 TRAVIS BLVD Commercial 7.55 5,690.25 5,585.36 0033-240-040 1450 TRAVIS BLVD Commercial 3.64 2,747.88 2,697.22 0033-240-050 1544 TRAVIS BLVD Commercial 44.86 33,803.11 33,180.06 0033-240-070 Commercial 0.58 442.75 434.58
0033-240-080 1519 GATEWAY BLVD Commercial 8.00 6,031.24 5,920.06 0033-240-100 1451 GATEWAY BLVD Commercial 24.58 18,522.16 18,180.76 0033-240-110 1795 PENNSYLVANIA AVE Commercial 1.80 1,357.94 1,332.90 0033-240-120 1547 GATEWAY BLVD Commercial 25.03 18,864.25 18,516.54 0033-240-130 1350 TRAVIS BLVD Commercial 86.18 64,932.81 63,736.00 0033-240-140 1495 GATEWAY BLVD Commercial 3.01 2,273.73 2,231.80 0033-240-160 1340 TRAVIS BLVD Commercial 4.05 3,055.49 2,999.16 0033-240-170 1330 TRAVIS BLVD Commercial 41.86 31,541.59 30,960.22 0033-240-180 1320 TRAVIS BLVD Commercial 2.08 1,571.37 1,542.40 0033-240-190 TRAVIS BLVD Commercial 1.15 871.43 855.36
0033-240-200 TRAVIS BLVD Commercial 37.81 28,489.48 27,964.36 0033-250-010 1501 GATEWAY CT Commercial 2.90 2,189.09 2,148.74 0033-250-020 1525 GATEWAY CT Commercial 3.61 2,726.53 2,676.26 0033-250-030 1600 TRAVIS BLVD Commercial 1.51 1,144.64 1,123.54 Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 1 of 2 04/30/2025 03:08:05PM
City of Fairfield
Lighting Maintenance District No. 2023-1 (Gateway)
Assessment Roll for Fiscal Year 2025/26
Assessor's Parcel
Number Site Address
Land Use
Classification
Total Benefit
Points Max Assessment FY 2025/26 Levy
0033-250-040 Commercial 1.68 1,267.91 1,244.52
0033-250-050 1730 TRAVIS BLVD Commercial 1.88 1,420.33 1,394.14 0033-250-060 1750 TRAVIS BLVD Commercial 4.94 3,728.23 3,659.50 471.78 $355,613.97 $349,058.9044 Accounts
Slight variances may occur due to rounding
Copyright © 2013 by NBS Page 2 of 2 04/30/2025 03:08:05PM
City of Fairfield
Landscaping and Lighting Maintenance District No. 2023-1 (Gateway) – Fiscal Year 2025/26 Report 26
10. REFERENCES
Beutz v. Cnty. of Riverside, 184 Cal. App. 4th 1516, 1532 (2010) Broad Beach Geologic Hazard Abatement District v 31506 Victoria Point LLC, B304699 (81 Cal. App. 5th 1068, 1090 (2022))
National Cooperative Highway Research Program, “Transportation Research Board of The National Academies 2009 Annual Report”, 2009.
Coder, Kim D. “Identified Benefits of Community Trees and Forests.” University of Georgia Cooperative Extension Service - Forest Resources Publication, October 1996.
Van Dillen, Sonja et. al, “Greenspace in urban neighborhoods and residents’ health: Adding quality to quantity”, 2012.
Crompton, John L. "Parks and Economic Development." American Planning Association, p. 31-48, 2001.
Department of Parks and Recreation, California (DPR). "The Health and Social Benefits of Recreation." Sacramento, CA: California State Parks, March 2005.
Golden Hill Neighborhood Assn. v. City of San Diego CA4/1, D062203 (199 Cal. App. 4th 416, 438 (2011)) Iris Vilnai-Yavetz & Shaked Gilboa (2010) The Effect of Servicescape Cleanliness on Customer Reactions, Services Marketing Quarterly, 10.1080/15332961003604386 Reliance Foundry, “11 Benefits of Streets Trees in Urban Spaces, (2019), ” https://www.reliance- foundry.com/blog/11-benefits-street-trees
Pennsylvania Landscape & Nursery Association, (2022), “About the Green Industry,” https://www.plna.com/page/About_Industry
Kearney, Anne R. "Residential Development Patterns and Neighborhood Satisfaction: Impacts of Density and Nearby Nature." Environment and Behavior, 38, 112-139, 2006.
Rea, Mark S., et al. "Review of the Safety Benefits and Other Effects of Roadway Lighting." National Cooperative Highway Research Program Transportation Research Board of the National Academies, June 2009.
Throsby, D. “Cultural heritage as financial asset in strategies for urban development and poverty alleviation.” Paper for International Conference for Integrating Urban Knowledge & Practice, 2005.
Fairfield, City of. “Average Daily Traffic (ADT) Citywide Traffic Counts Map (Updated 2018)”, https://fairfield.maps.arcgis.com/apps/webappviewer/index.html?id=908b0082da8c47be87fb0689 75b69d35
Fairfield, City of. “City of Fairfield Design, Construction and Materials Specification Handbook”, 2020.
Town of Tiburon v. Bonander, 180 Cal. App. 4th 1057, 1084 (2009) "Trip Generation Manual, 11th Edition." Washington, D.C.: Institute of Transportation Engineers, 2022.
Agenda Item No: J.6
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2025 -98 PW Planning Area 5 – NBR Culvert Crossing Improvement Agreement
Authorizing the City Manager to Execute an Improvement Agreement to Construct the City of Fairfield Culvert Pipe Crossing Improvements
Funding Source: N/A
Contact: Alvin Lei, (707) 428-7476
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
One Lake Holding, LLC (Developer) is developing Planning Areas 4 and 5 (Development) of the Train Station Specific Plan (TSSP). A portion of the Development has an existing 18 -inch culvert, a type of tunnel or pipe that carries water under a road, railway, or pathway. This 18-inch culvert drains on the southern corner of the City of Fairfield’s Northbay Regional Water Treatment Plant.
To support stormwater drainage from the Development, the Developer is constructing an additional 36-inch culvert next to the 18 -inch culvert. The recommended act ion authorizes the Developer to construct these improvements.
DISCUSSION
On October 27, 2021, the City of Fairfield Planning Commission reviewed and approved the “Planning Area 5” tentative subdivision map of the TSSP by adopting Planning Commission Resolution No. PC2021-22.
The City currently owns and maintains an existing 18 -inch storm drain culvert that is located on the City’s Northbay Regional Water Treatment Plan Parcel (Assessor’s Parcel Number: 0166-060- 120). A new subdivision, Neighborhood A/B, is designed to drain stormwater towards this culvert.
To handle the additional stormwater directed towards the existing storm drain, the Developer is building a new 36-inch stormwater culvert pipe next to the existing 18 -inch stormwater culvert pipe. This pipe crosses over the Department of Water Resources’ existing 72-inch Northbay Aquaduct Transmission Main.
The Developer has received necessary permits from the Department of Water Resources to construct the new stormwater pipe culvert. The developer has provided all the necessary bonds, insurance, and paid the fees required to enter into this Agreement with City of Fairfield.
FINANCIAL IMPACT
There is no cost to the City in constructing the public improvements contemplated under the agreement. Acceptance of the public improvements by the council will obligate the City to maintain the new 36-inch storm drainpipe and associated improvements.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
If the council has any additi onal questions, action on this item may be postponed until those questions are addressed.
COORDINATED WITH
City Attorney’s Office
STAFF CONTACT
Alvin Lei, Senior Civil Engineer
(707) 428-7476
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Proposed Agreement
Attachment 4: Culvert Pipe Crossing – Vicinity Map
CITY OF FAIRFIELD
RESOLUTION NO. 2025-98
AUTHORIZING THE CITY MANAGER TO EXECUTE AN IMPROVEMENT AGREEMENT TO
CONSTRUCT THE CITY OF FAIRFIELD CULVERT PIPE CROSSING IMPROVEMENTS
WHEREAS, the City of Fairfield Planning Commission reviewed and approved the “Planning Area 5” tentative subdivision map of the Fairfield Train Station Specific Plan on October 27, 2021, by adopting Planning Commission Resolution No. PC2021-22, as amended per project number PDA2024-001; and
WHEREAS, One Lake Holding, LLC (Developer) is constructing a new subdivision that discharges towards an existing 18-inch stormwater pipe on the City’s Northbay Regional Water Treatment Plant on Assessor’s Parcel Number (APN): 0166-060-120; and
WHEREAS, the Developer and City both desi re to ensure stormwater discharge from the new subdivision is adequately conveyed; and
WHEREAS, City staff has reviewed the engineering design, plans, and specifications for the City of Fairfield (APN: 166-060-120) Culvert Pipe Crossing Department of Water Resources (DWR EP 2034) and found them to be reasonable and consistent with the current City Standard Specifications and Details; and
WHEREAS, the developer has provided all of the necessary bonds , insurance, and paid the fees required to enter into this improvement agreement.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The plans and specifications for the City of Fairfield (APN: 166-060-120) Culvert Pipe Crossing Department of Water Resources (DWR EP 2034) are hereby approved , and the city engineer is authorized and directed to sign and approve the engineering plans associated with the improvement agreement.
Section 2. The city manager is authorized and directed to execute that certain improvement agreement, between the City and the Developer.
Section 3. The city manager is hereby authorized to do all things necessary and proper to implement the above-mentioned agreement.
RES NO. 2025-98
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: COUNCILMEMBERS: MOY / BERTANI / CARR / PANDURO /TONNESEN / SANDHU / WILLIAMS
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
MAYOR
ATTEST:
____________________________
CITY CLERK
CITY OF FAIRFIELD
IMPROVEMENT AGREEMENT
CITY OF FAIRFIELD (APN: 166-060-120)
CULVERT PIPE CROSSING DWR (DWR EP 2034)
One Lake Holding, LLC
THIS IMPROVEMENT AGREEMENT ("Agreement"), for purposes of identification dated _ _ _ _ _ _ , 2025 is made and entered into by and between the CITY OF FAIRFIELD, a municipal corporation, hereinafter referred to as "City," and One Lake Holding, LLC, a Delaware limited liability company hereinafter referred to as "OLH." RE C IT A L S:
A. There is an existing 18-inch stormdrain pipe, located on the southeast corner of the City's Northbay Regional Water Treatment Plant (NBR) site (Assessor's Parcel Number (APN): 0166-060-200).
B. OLH is constructing a large residential development in the Train Station Specific Plan, commonly referred to as Planning Area 5, upstream from this 18-inch storm drain pipe and stormwater from a portion of this residential development is collected and conveyed towards the pipe. OLH desires to construct improvements to improve stormwater conveyance.
C. This Agreement concerns improvements commonly referred to as the City of Fairfield (APN: 166-060-120). Culvert Pipe Crossing DWR (DWR EP 2034) (the "Required Improvements").
A G R E E M E N T S:
The parties hereto agree as follows:
1. The General Contractor: City acknowledges and agrees that OLH is not a licensed contractor but that OLH will be contracting with a licensed general contractor (the "General Contractor") who will furnish, construct and install the Required Improvements pursuant to this Agreement. The contract between OLH and General Contractor for completion of the Required Improvements is referred to herein as the Construction Contract. -1-
2. 3.
4. Performance of Work: OLH agrees to furnish, construct, and install at its own expense, or cause to be furnished, constructed, and installed, all Required Improvements as shown on the plans and specifications, a copy of which is on file in the Office of the City Engineer and is incorporated herein by reference, along with any changes and modifications as may be required by the City Engineer due to errors of omission on the plans.
Work; Satisfaction of the City Engineer: All of the work on the Required Improvements is to be done at the places, with the materials, and in the manner and at the grades, all as shown upon the approved plans and specifications and the City's Standard Specifications and Details as authorized via Fairfield City Council Resolution 2014-93, and to the satisfaction of the City Engineer. No building permits or occupancy will be allowed for any building which fronts on improvements required by this Agreement until those improvements are constructed and approved by the City Engineer and the following conditions are satisfied:
a. Storm drainage utility infrastructure proposed as part of the Required Improvements shall be operational, connected and discharge to existing public infrastructure.
b. Any all-weather access roads to the building area within the right-of way, as approved by the Fire Marshal, shall be constructed consisting of a minimum six inches of aggregate base rock. c. See Section 21, "Additional Terms and Conditions", for additional building permit restrictions, if any.
Work; Time for Commencement and Performance: City fixes the time for the construction commencement of the work to be within fifteen (15) days following approval of this Agreement, and for its completion to be within 365 calendar days thereafter, based on the construction schedule provided by OLH and attached hereto as Exhibit A. At least fifteen (15) calendar days prior to the commencement of work hereunder, OLH shall notify the City Engineer in writing of the date fixed by OLH for construction commencement thereof, so that the City Engineer shall be able to provide -2-
7. services of inspection and a pre-construction meeting shall be held between the Parties.
5. Time of Essence: Extension: Time is of the essence of this Agreement, but the dates for commencement and completion of the work of construction may be extended pursuant to Sections 6 through 8 of this Agreement. The City Engineer shall be the sole and final judge as to whether good cause has been shown to entitle OLH to an extension.
6. Request for Extension; Granting: Requests for extension of commencement and completion date shall be in writing, and shall be delivered to City in the manner hereinafter specified for services of notices.
Extensions, if granted, shall be in writing; an oral extension shall not be valid for any purpose whatsoever.
Extension: No Release of Obligations: In the event it is deemed necessary by the City to extend the time of commencement or completion of the work , to be done under this Agreement beyond the dates specified herein, such extension as shall be granted shall in no way release any guarantee given by OLH pursuant to this Agreement, or to relieve or release those providing improvement security pursuant to this Agreement. The sureties in executing the bonds shall be deemed to have expressly agreed to any such extension of time.
Extension: Conditions: The granting of any extension may be conditioned upon OLH providing City with new or amended surety bonds in amounts increased to reflect increases in the costs of constructing the Required Improvements that have occurred prior to the granting of the extension or are likely to occur prior to the completion of work.
9. Improvement Security: Concurrently with the execution hereof, OLH shall furnish City:
(a) Improvement security in the sum of $281,033.00, which sum
8. is equal to one hundred ten percent (110%) of the estimated cost of constructing the Required lmproyements and the cost -3-
of any other obligation to be performed by OLH hereunder, securing the faithful performance of this Agreement.
(b) Separate improvement security in the sum of $140,517.00, which sum is equal to fifty-five percent (55%) of the estimated cost of constructing the Required Improvements, securing payment to the General Contractor, its subcontractors, and to persons furnishing labor, materials, or equipment to them for the construction of the Required Improvements.
The form of the improvement security shall be subject to the approval of the City Attorney. Improvement security shall be reduced or released by City only in the manner provided by the Ordinances of the City. No change, alteration, or addition to the terms of this Agreement or the plans and specifications accompanying the same shall in any manner affect the obligation of those providing improvement security pursuant to this Agreement.
10. Engineering and Inspection Fee: OLH shall:
(a) Pay to the City an engineering plan check fee of 1.35% of the total cost of the Required Improvements, as estimated by the City Engineer, less the initial plan check fee of one percent (1 %) of the total cost paid upon submittal of improvement plans, rounded to the nearest whole number. The total
amount of this fee still due is:
(1.35% X $255,484.00) - $1,350.00 = $2,099.03.
(b) Pay to the City an engineering and inspection fee of five and a half percent (5.5%) of the total cost of the Required Improvements, rounded to the nearest whole number, as
estimated by the City Engineer, being:
5.5% X $255,484.00 = $14,051.62.
-4-
Fee includes only items of work to be inspected by the City. It is understood that such fee covers only those inspections and engineering work performed by the City during the normal working hours of the City.
11. Hold Harmless Agreement: OLH will indemnify, hold harmless and assume defense of, in any actions of law or in equity, the City of Fairfield, its officers, employees, agents, and elective and appointive boards from all claims, losses, damage, including property damage, personal injury, including death, and liability of every kind, nature and description, directly or indirectly arising from the operations of OLH, General Contractor or any subcontractor, or of any person directly or indirectly employed by, or acting as agent for OLH, General Contractor or any subcontractor, but not including the sole or active negligence or willful misconduct of the City of Fairfield. This indemnification shall extend to claims, losses, damages, injury and liability for injuries occurring after completion of the work as well as during the work's progress.
Acceptance of insurance certificates required under this Agreement does not relieve OLH from liability under this indemnity and hold harmless clause. \
This indemnity and hold harmless clause shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of OLH's, its General Contractor's or any subcontractor's operations regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages.
12. Contractor's Insurance: OLH shall not commence work under this Agreement or permit its General Contractor or any subcontractor to commence work thereunder until OLH shall have obtained or caused to be obtained all insurance required under this paragraph and such insurance shall have been approved by the City Engineer of City as to form, amount, and carrier. The insurance shall be maintained in force and effect until the completion of work under this Agreement and the acceptance thereof by -5-
City. All requirements herein provided shall appear either in the body of the insurance policies or as endorsements, and shall specifically bind the insurance carrier.
(a) WORKER'S COMPENSATION INSURANCE: OLH shall
obtain and maintain (or cause to be obtained and maintained) workers' compensation insurance for all OLH and General Contractor employees employed at the site of improvement.
Proof of a qualified self-insurance program is acceptable.
OLH shall require any sub-contractor similarly to provide workers' compensation insurance for all of the subcontractor's employees, unless such employees are covered by the
protection afforded by OLH or the General Contractor. In case any class of employees engaged in work under this
Agreement at the site of the project is not protected under any workers' compensation law, OLH shall provide, and shall cause General Contractor and each subcontractor to provide, adequate insurance for the protection of employees not
otherwise protected. OLH hereby agrees to indemnify City for any damage resulting to it from failure of General Contractor or any subcontractors to take out or maintain such insurance.
OLH shall provide the City Engineer with a certificate of insurance indicating workers' compensation coverage prior to engaging in any activity required by this Agreement.
(b) LIABILITY INSURANCE: OLH, at its sole expense, shall obtain and maintain (or cause to be obtained and maintained) an insurance policy or policies, issued by an insurer or insurers as defined by the California Insurance Code with an A.M. Best rating of B+/XII or A-N II or better, providing the City, its officers, employees, and agents, named as additional insureds under the policy, broad form property damage,
personal injury, automobile, employers', and comprehensive -6-
form liability insurance in the amount of not less than $3 million per occurrence. By the terms of the insurance policy or policies, such insurance shall be deemed primary
insurance, and no other insurance effected by the City or other named insureds will be called upon to cover a loss covered thereunder. See Exhibit C for the City's minimum insurance requirements.
In the event that any of the insurance policies provided for in this Section 12 insures any entity, persons, boards, or commissions other than those mentioned in this paragraph, such policy shall contain a standard form of cross-liability endorsement, insuring on such policy City, its elective and appointive boards, commissions, officers, agents, and employees, OLH, General Contractor and any subcontractor performing work covered by this Agreement. All stated minimum levels of insurance may be met by a combination of primary, excess, and umbrella insurance, including any fronting or captive insurance, provided lndemnitee is endorsed as an additional insured with regard to all such excess coverage.
City agrees that the insurance requirements in this Section 12 may be satisfied with insurance furnished by the General Contractor that meets such insurance requirements. In its contract with the General Contractor, OLH agrees to require the General Contractor to agree to include in its subcontracts with all of its subcontractors (a) the same requirements and provisions of this Agreement including the indemnity and Insurance requirements to the extent they apply to the scope of the subcontractors' work, and (b) the requirement that the subcontractors include such provisions in the subcontracts, if any, that such subcontractors enter into with its subcontractors.
13. Evidence of Insurance: OLH shall furnish the City Engineer prior to commencement of any work hereunder, with satisfactory evidence of the insurance required, and evidence that each carrier is required to give City -7-
16. at least thirty days prior notice of the cancellation or reduction in coverage of any policy during the effective period of this Agreement.
14. Title to Improvements: Title to and ownership of all improvements constructed hereunder shall vest absolutely in City upon completion and acceptance of such improvements by City.
15. Repair or Reconstruction of Defective Work: If, within a period of one year after final acceptance of the work performed under this Agreement, any improvement or part of any improvement furnished and/or installed or constructed, or caused to be installed or constructed by OLH, or any of the work done under this Agreement fails to fulfill any of the requirements of this Agreement or the specifications referred to herein, OLH shall without delay and without any cost to City, repair or replace or reconstruct, or cause to be repaired or replaced or reconstructed, any defective or otherwise unsatisfactory part or parts of the work or structure. Should OLH fail to act promptly or in accordance with this requirement, or should the exigencies of the case require repairs or replacements to be made before OLH can be notified, City may, at its option, make the necessary repairs or replacements or perform the necessary work, and OLH shall pay to City the actual cost of such repairs plus fifteen percent (15%) within thirty (30) days of the date of billing for such work by City.
Neither OLH nor General Contractor Are Agent of City: Neither OLH nor General Contractor nor any of OLH's or General Contractor's agents or subcontractors are or shall be considered to be agents of City in connection with the performance of the obligations under this Agreement.
17. Notice of Breach and Default: If OLH refuses or fails to obtain prosecution of the work, or any severable part thereof, with such diligence as will ensure its completion within the time specified, or any extension thereof, or fails to obtain completion of the work within such time, or if OLH should be adjudged a bankrupt, or OLH should make a general assignment for the benefit of OLH's creditors, or if a receiver should be appointed in the event of OLH's insolvency, or if OLH or its General Contractor or any of its -8-
subcontractors, agents, or employees should violate any of the provisions of this Agreement, City Engineer may serve written notice upon OLH and OLH's surety of breach of this Agreement, or of any portion thereof, and of default of OLH hereunder.
18. Breach of Agreement; Performance by Surety or City: In the event of any such notice, OLH's surety shall have the duty to take over and complete the work and the improvement herein specified; provided, however, that if the surety within fifteen (15) days after the serving of such notice of breach upon it does not give City written notice of its intention to take over the performance of the contract, and does not commence performance thereof within fifteen (15) days after notice to City of such election, City may take over the work and prosecute the same to completion by contract, or by any other method City may deem advisable, for the account and at the expense of OLH, and OLH's surety shall be liable to City for any excess cost of damages occasioned City thereby; and in such event, City, without liability for so doing, may take possession of and utilize in completing the work, such materials, appliances, plant and other property belonging to OLH or its General Contractor as may be on the site of the work and necessary therefor. OLH shall cause the Construction Contract to include a provision implementing the rights of City pursuant to this Section 18.
19. Notices: All notices herein required shall be in writing, and delivered in person or sent by registered mail, postage prepaid.
Notices required to be given to City shall be addressed as follows:
Fairfield City Hall, Attn: City Engineer
1000 Webster Street
Fairfield CA 94533
Notices required to be given to OLH shall be addressed as follows:
ONE LAKE HOLDING LLC
2121 N. CALIFORNIA BLVD, STE #1010
WALNUT CREEK CA 94596
-9-
(To be completed by OLH)
Notices required to be given surety of OLH shall be addressed as follows:
ONE LAKE HOLDING LLC
2121 N. CALIFORNIA BLVD, STE #1010
WALNUT CREEK CA 94596
(To be completed by Surety)
Any party or the surety rriay change such address by notice in writing to the other party and thereafter notices shall be addressed and transmitted to the new address.
20. Oversizing: Public improvement oversizing and/or reimbursement as defined in City Code Chapter 68, Chapter 10, Article IV, Sections 10.56 through 10.65; and Chapter 25, Article Ill, Section 25.166.79 through
25.166.81 is not applicable.
21. Additional Terms and Conditions: This Agreement is subject to the following additional terms and conditions (except as specifically provided otherwise):
a) Approval of this Agreement shall not obligate the City to subsequently accept improvements which strictly conform to the plans referenced by this Agreement. All costs associated with modifications resulting from subsequent improvement plan changes required by the City shall be borne by OLH.
22. Prohibited Interest: No employee of the City shall have any direct financial interest in this Agreement. This Agreement shall be voidable at the opinion of the City if this provision is violated.
23. Local Employment Policy: The City of Fairfield desires, wherever possible, to hire qualified local residents to work on city projects. Local resident is defined as a person who resides in Solano County.
The City encourages an active affirmative action program on the part of its contractors, consultants, and OLHs.
-10-
When local projects require, subcontractors, contractors, consultants, and OLHs will solicit proposals from qualified local firms where possible.
24. Qualified Bids: Both the City and OLH acknowledge and agree that the contractor chosen as the General Contractor will satisfy the City's bidding requirements applicable to reimbursements for the improvements to be constructed under this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Improvement Agreement on the date set forth opposite its respective signatures.
Dated: - - - - - - - - - -
ATTEST:
By: _
City Clerk
City of Fairfield,
a municipal corporation
By: _
City Manager
One Lake Holding, LLC
a Delaw limited liability co pany
r .
-11-
Exhibit A
Task Name Duration Start Finish
CULVERT PIPE CROSSING
Manually rade days Mon 8/4/25 Scheduled
Manually o days Fri 8/8/25 Scheduled
Manually poxy pipe DWR days ed 8/20/25 cheduled
Manually days ue 8/26/25 Scheduled
1
Exhibit 8
IMPROVEMENT AGREEMENT CHECK LIST
SUBDIVISION: City of Fairfield (APN: 166-060-120), Culvert Pipe Crossing DWR (DWR EP 2034) OWNER: One Lake Holding, LLC
ADDRESS: 2121 N. California Blvd., Ste #1010, Walnut Creek, CA 94596 COUNCIL MEETING DESIRED: June 3, 2025
SUBMISSION DEADLINE: noon May 7, 2025
DESCRIPTION QUANTITY UNIT COST AMOUNT RECD BY DATE
Plan Check Fee (less initial PC) 1.35% $255,484 $2,099
Engineering/Inspection Fee 5.5% $255,484 $14,052
FSSD Plan Check Fee NA $0
TOTAL: $16,151
Bid Estimate $255,484
Faithful Performance Bond 110% $281,033
Labor and Materials Bond 55% $140,517
Insurance Certificate $3 Million
Signed Agreement
Construction Plans
Executed Copies Provided to:
City Manager
City Engineer
OLH
3&cM, Inc.
I Description Quantity Unit Unit Price Total I Storm Drain System 50" Epoxy Coated Steel casing 62 LF $2,442.00 $151,404.00 36" HDPE N-12 Main 90 LF $234.00 $21,060.00
Rip Rap Outlet 1 EA $8,285.00 $8,285.00
Rip Rap Inlet 1 EA $5~100.00 $5,100.00
Warning Sign Plaque 2 EA $750.00 $1,500.00
Headwall 1 EA $59,955.00 $59,955.00
Cathodic Protection 1 LS $8,180.00 $8,180.00
Storm Drain System Subtotal@ $255,484.00
Proposal Total@ $255,484.00
NOTES TO PROPOSAL
THE BELOW LISTED NOTES TO PROPOSAL OUTLINE THE CONDITIONS OF THE PROPOSAL AND MUST BE INCLUDED AS AN INTEGRAL PART OF ANY SUBCONTRACT AGREEMENT OR PUROlASE ORDER.
DATE: MARCH 27, 2025
TO: MCKINLEY PARTNERS, LLC
ATTENTION: MARK ELROD
PROJECT: CANON STATION- CULVERT PIPE CROSSING DWR- FAIRFIELD, CA •REVISION 1• PROPOSAL IS BASED UPON THE FOLLOWING DOCUMENTS:
1. CITY OF FAIR FILED CULVERT PIPE CROSSING DWR IMPROVEMENT PLANS BY CBG DATED NOVEMEBR 2024. 20SHEETS.
_ESTIMATED DURATIONS- ONE Ill CREW WORKING EIGHT@) HOURS PER DAY, MONDAY-FRIDAY;
1. STORM: 9 DAYS
ESTIMATED DURATIONS ARE FOR PRODUCTION WORK ONLY. DURATIONS DO NOT INCLUDE TESTING OR #CLEANUP" (E.G. RAISE IRON, SET METER BOXES, ADJUST CLEANOUTS). THE DURATIONS ARE INFORMATIONAL ONLY ANO NON-BINDING. ANY FORMAL PROJECT SCHEDULES SHALL BE PROVIDED TO ANO APPROVED BY J&M.
SCOPE PROVISIONS;
1. TRENCH DEWATERING IS NOT REQUIRED PER SOILS REPORT INDICATIONS. ALL TRENCH DEWATERING IS EXLCUDEO. IF DEWATERING IS REQUIRED, ALL COSTS WILL BE TRACKED ON TIME AND MATERIALS.
2. IF BOULDERS ARE ENCOUNTERED DURING EXCAVATION, LOSS OF PRODUCTION TO HANDLE THE BOULDERS WILL BE TRACKED ON TIME AND MATERIALS.
3. PROPOSAL IS BASED UPON PIPE ZONE BEDDING AND BACKFILL PER CITY OF FAIRFIELD BUILDING DEPARTMENT SPECIFICATIONS. BACKFILLING OF TRENCH ZONE IS WITH NATIVE MATERIAL AFTER MOISTURE CONDITIONING. TRENCHES THAT ARE OUTSIDE THE DEMO SAWCUT LINE OR THAT ARE IN THE PUBLIC RIGHT-OF-WAY WILL BE SAWClJT, BACKFILLED AND PATCH PAVED PER CITY OF FAIRFIELD SPECIFICATIONS.
6700 Natlonal Drive, Livermore, CA 94550 I Tel: 925-724-0300 I Fax: 925-724-0 160 Updated March 2025
Exhibit C
INSURANCE REQUIREMENTS
OLH shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by OLH, its agents, representatives, or employees.
1) MINIMUM SCOPE AND LIMITS OF INSURANCE
a) Commercial General Liability coverage (occurrence Form CG 00 01) with minimum limits of $3,000,000 per occurrence for bodily injury, personal injury, products and completed operations, and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b) Automobile Liability coverage (Form CA 00 01 with Code 1 - any auto) with minimum limits of $3,000,000 per accident for bodily injury and property damage. c) Workers' Compensation insurance as required by the State of California and Employers' Liability insurance, each in the amount of $1,000,000 per accident for bodily injury or disease.
2) INDUSTRY SPECIFIC COVERAGES
If checked below, the following insurance is also required:
✓ Professional Liability Insurance / Errors and Omissions Liability in the minimum amount of $3,000,000 per occurrence.
D Pollution Liability Insurance in the minimum amount of $3,000,000 per occurrence □ Garage Keepers Insurance in the minimum amount of $3,000,000 per occurrence D Fidelity / Crime / Dishonesty Bond in the minimum amount of$ _ D MCS-90 Endorsement to Business Automobile insurance for transportation of hazardous materials and pollutants
□ Builder's Risk / Course of Construction Insurance in the minimum amount of $ _
3) INSURANCE PROVISIONS
a) Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the CITY. At the option of the CITY,
either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the CITY, its officers, officials, employees and volunteers; or OLH shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.
b) The general and automobile liability policies (and if applicable, pollution liability, garage keepers liability and builder's risk policies) are to contain, or be endorsed to contain, the following provisions:
i) The CITY, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of work or operations performed by or on behalf of OLH; products and completed operations of OLH; premises owned, occupied or used by OLH; and automobiles owned, leased, hired or borrowed by OLH. The coverage shall contain no special limitations on the scope of protection afforded to the CITY, its officers, officials, employees or volunteers.
ii) For any claims related to this project, OLH'S insurance coverage shall be primary insurance as respects the CITY, its officers, officials, employees and volunteers. Any insurance or self-insured maintained by the CITY, its officers, officials, employees or volunteers shall be in excess of OLH'S insurance and shall not contribute with it.
iii) Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the CITY, its officers, officials, employees or volunteers.
iv) OLH'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. v) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the CITY. vi) The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated above shall not serve to reduce OLH'S policy limits of coverage. Therefore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement, or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured, whichever is greater. c) Acceptability of Insurer. Insurance is to be placed with insurers with a current A.M.
Best's rating of no less than A:VII, unless otherwise acceptable to the CITY.
Verification of Coverage. OLH shall furnish the CITY with original endorsements effecting coverage required by this Exhibit D. The endorsements are to be signed by a person
authorized by that insurer to bind coverage on its behalf; on forms equivalent to CG 20 10 11 85, subject to CITY approval; and submitted electronically through the Exigis insurance system to: [email protected]. All insurance certificates and endorsements are to be received and approved by the CITY before work commences. At the request of the CITY, OLH shall provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications.
d) Sub-contractors. OLH shall require all subcontractors to procure and maintain insurance policies subject to the requirements of Exhibit D. Failure of OLH to verify existence of sub-contractor's insurance shall not relieve OLH from any claim arising from sub-contractors work on behalf of OLH.
N ➤ ➤
N
Image © 2025 Airbus
Image © 2025 Airbus
Image © 2025 Airbus
Neighborhood A & B
Culvert
Crossing
Plannning Area 4
DENSITY CALCULATION
MANUEL CAMPOS PKWY
PEABODY ROADVANDEN ROADFOXBOROPARKWAYNUT TREE ROADLEISURE TOWNROADFRY ROAD
ALAMO DRIVECLAYBANKROADCEMENT HILL ROADEAST TABORAVENUEAIRBASE PARKWAYWALTERS ROADRAILROADAVENUE 80 TRAVIS AIRFORCE BASEMERIDIAN ROADMcCRORY ROADLEWIS ROADHAY ROAD
MARKELEY LANEGATE ROADCEMENT HILL ROADPROJECT SITEVICINITY MAP
PEABODY ROAD
VANDEN ROAD
AIR BASE
PARKWAY
PROJECT SITE
CEMENT HILL ROAD
CITY
LIMIT
TE
ONE L
COVR S
ATTACHMENT 4
VICINITY MAP
Plannning Area 5
Northbay
Regional Treatment
Plant
PEABODY ROAD
VANDEN ROAD Page 660 of 745
Agenda Item No: J.7
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2025 -99 PW Authorization to Increase F iscal Year 2024-2025 Budget in Transportation Fund
Authorizing an Update to the Fiscal Year 2024 -2025 Transportation Budget for the Transit FAST Connect & Americans with Disabilities Act Fund
Funding Source: $1,640,000; Transportation Fund ($1,140,000, Transportation Development Act; $500,000, Federal Transit Administration)
Contact: Nicole Benson, (707) 434-3806
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
The City of Fairfield’s Public Works Department’s Transportation Division is responsible for administering Fairfield’s transit system, FAST. This includes the City’s fixed route (FAST), microtransit (FAST Connect) and paratransit (FAST Connect Americans with Disabilities Act [ADA]) systems. The Transportation Division receives and is allocated grant funding to operate FAST services, the primary of which being the Transportation Development Act (TDA) and the Federal Transit Administration (FTA). The adoption of this resolution authorizes an update to the fiscal year (FY) 2024-2025 Budget to increase grant fund allocations.
DISCUSSION
The Transportation Division receives grant funding from multiple sources, the primary of which being TDA and FTA. These monies were previously allocated for and allow the Transportation Division to operate public transportation for the City. Due to increased costs and administrative oversight, increased expenses for grant funds in FY 2024-2025 were not adequately budgeted in the Transit FAST Connect & ADA Fund (Fund 452), which prevents these funds from being utilized despite their availability. Four microtransit/paratransit vehicles were purchased in April for FAST
Connect and FAST Connect ADA Services. Due to an increase in costs, this expense exceeded what was e stimated in the original budget. Due to administrative oversight, funds were primarily allocated to the Transit Fixed Route Fund (Fund 451) in the FY 2024-2025 budget. As funds should have been split between Transit Fixed Route Fund and the Transit FAST Connect & ADA Fund, some budget items in the Transit FAST Connect & ADA Fund do not have adequate funds allocated. As such, the Transportation Division does not have enough money allocated to Transit FAST Connect & ADA Fund to continue operations for the rem ainder of the fiscal year. This increase in budget will allow FAST to continue providing the essential service of public transportation for FY 2024 -2025. This includes paying contractors, consultants, janitorial, landscaping, insurance, bus stop improvemen ts, organization dues, electricity and gasoline as needed.
FINANCIAL IMPACT
The total authorization for an increase in appropriations to the FY 2024 -2025 budget for the Transportation (Fund 452) is $1,640,000 from the following: $1,140,000 for the Transportation Development Act and $500,00 0 for the Federal Transit Administration . No general fund money will be used.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The City Council may reject this resolution. However, this is not recommended due to the need to provide public transit services to the City of Fairfield. If this occurs, the City would need to reduce and/or eliminate microtransit (FAST Connect & FAST Connect ADA) services.
COORDINATED WITH
Finance Department
STAFF CONTACT
Nicole Benson, Management Analyst
(707) 434-3806
[email protected]
ATTACHMENTS
Attachment 1: Proposed Resolution
CITY OF FAIRFIELD
RESOLUTION NO. 2025-99
AUTHORIZING AN UPDATE TO THE FISCAL YEAR 2024-2025 TRANSPORTATION BUDGET FOR
THE TRANSIT FAST CONNECT & AMERICANS WITH DISABILITIES ACT FUND
WHEREAS, the City of Fairfield’s Public Works Department’s Transportation Division is responsible for administering Fairfield’s transit system, FAST; and
WHEREAS, the Transportation Division receives grant funding to operate FAST services, the primary of which are the Transportation Development Act (TDA) and the Federal Transit Administration (FTA); and
WHEREAS, increased expenses for grant funds in fiscal year (FY) 2024-2025 were not adequately budgeted in the Transit FAST Connect & ADA Fund (Fund 452), which prevents these funds from being utilized despite their availability; and
WHEREAS, this increase in budget will allow FAST to continue providing the essential service of public transportation for FY 2024-2025, thus requiring a budget adjustment of $1,640,000; and
WHEREAS, the revised appropriation constitutes an update to the FY 2024 -2025 Budget approved pursuant to Resolution No. 2024-133.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The council hereby approves a one-time budget adjustment of $1,640,000 ($1,140,000 Transportation Development Act ; $500,000 Federal Transit Administration ) for the Transportation Division’s FY 2024 -2025 budget for the Transit FAST Connect & ADA Fund (Fund 452).
Section 2. The council hereby approves an increase in appropriations of $1,640,000 in the Transit FAST Connect & ADA Fund (Fund 452).
RES. NO. 2025-99
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________
_________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
Agenda Item No: J.8
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2025-100 PR Contract Services for Afterschool Programs with Fairfield- Suisun Unified School District
Approving an Independent Contractor Service Agreement for Professional Services Between the City of Fairfield and the Fairfield-Suisun Unified School District to Provide Afterschool Program Services
Funding Source: N/A
Contact: Kristina Kaunzinger, (707) 428-7470
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
Fairfield-Suisun Unified School District (FSUSD) has state funding to offer after-school programming to FSUSD -eligible students and seek s a partnership with the City of Fairfield , through the Parks & Recreation Department, to staff and operate an after -school program at Anna Kyle Elementary, Fairview Elementary, and Sullivan Academy.
DISCUSSION
Over the past two decades, the City of Fairfield Parks & Recreation received grant fu nding through the California Department of Education to staff, operate, and administer comprehensive afterschool programs at seven FSUSD school sites. In late 2024, the City received notification that grant funding is no longer eligible to be received dir ectly by cities, and funds will be transferred to the local school district, effective June 30, 2025.
The State of California provides funding for use by and through School Districts for Extending Learning Opportunities Programs (ELOP). FSUSD has been ope rating ELOP at all of their school sites for the past several years. In early 2024, FSUSD solicited an RFQ/P process for selecting contract service providers to staff and operate their ELOP programs. The City of Fairfield Parks
& Recreation responded to the solicitation and was selected as one of the contract service providers. The city will provide services at Anna Kyle Elementary, Fairview Elementary , and Sullivan Academy beginning August 13, 2025, through July 3, 2026. This includes 180 regular school days, including minimum release periods, and 30 days of full -day service during the summer.
A formal Independent Contract Service Agreement between the two agencies outlines the collaborative partnership and responsibilities. FSUSD will administer the State funding program and all reporting requirements. The city will provide qualified staffing and all program supplies for the daily operation of the after-school programs.
The ELOP funding will provide 100% of all the direct costs of the City’s commitment and responsibility for operating the programs. The anticipated service level requires the h iring of between 35 and 45 part-time staff as Recreation Lead and Recreation Assistant , with work schedules total ing up to approximately 1 ,200 hours per year each, and one (1) full -time Recreation Supervisor. These positions will be recruited as ‘provisional’ throughout the contract period or as extended and modified as mutually agreed by all parties.
FINANCIAL IMPACT
There is no financial impact as 100% of the cost for the contracted service will be reimbursed to the City with a not-to-exceed limit of $1,941,760.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
At the March 20, 2024, School Board Meeting, the Fairfield -Suisun Board of Directors approved the City of Fairfield Parks & Recreation Department to serve as one of the contracted service providers for the ELOP - afterschool programming.
ALTERNATIVE ACTION
The council may choose not to enter into a contract (RFQ/P-Contract #2244-26) for a service agreement with FSUSD.
COORDINATED WITH
N/A
STAFF CONTACT
Kristina Kaunzinger, Parks & Recreation Director
(707) 428-7470
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Proposed Agreement
CITY OF FAIRFIELD
RESOLUTION NO. 2025-100
APPROVING AN INDEPENDENT CONTRACTOR SERVICE AGREEMENT FOR PROFESSIONAL
SERVICES BETWEEN THE CITY OF FAIRFIELD AND THE FAIRFIELD-SUISUN UNIFIED SCHOOL
DISTRICT TO PROVIDE AFTERSCHOOL PROGRAM SERVICES
WHEREAS, Fairfield-Suisun Unified School District (FSUSD) receives State funding to provide Extending Learning Opportunities Programs (ELOP); and
WHEREAS, the FSUSD solicited a Request for Proposals ( RFQ) process for selecting contract service providers to staff and operate their ELOP programs; and
WHEREAS, the FSUSD Board of Directors approved utilizing the City of Fairfield, Parks & Recreation staff to serve as a contract service provider to operate th is program at Anna Kyle Elementary, Fairview Elementary, and Sullivan Academy; and
WHEREAS, FSUSD will reimburse the City of Fairfield 100% of the cost associated with providing said program service, which includes 180 regular school days, including early release days between August 13, 2025 , and June 5, 2026 , and full -day service during days outside of the regular school year, between June 8, 2026, and July 3, 2026.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The city manager or designee is hereby authorized to execute the independent contract agreement for professional services between the City of Fairfield and FSUSD.
Section 2. Approval for City of Fairfield, Parks & Recreation staff to provide contracted services to FSUSD for the purposes of operating an after -school program at Anna Kyle El ementary, Fairview Elementary, and Sullivan Academy which includes ensuring appropriate staff level, supplies, and equipment as outlined in the scope of serv ice of the contract agreement between FSUSD and City of Fairfield.
Section 3. Approval to hire provisional part-time staff members in the capacity of recreation lead and assistants, and a provisional full -time supervisor to oversee the program, staff, an d agreement.
Section 4. The contracted services period is August 13, 2025, through July 3, 2026.
RES. NO. 2025-100
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________
_________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
Agenda Item No: J.9
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2025 -101 FD Requesting I ndustrial Emergency Council Budget Adjustment
Approving a Net Neutral General Fund Budget Adjustment to the Fiscal Year 2024 -2025 Budget for the Fire Department Resulting from Participation in the Industrial Emergency Council Program
Funding Source: N/A
Contact: John Sturdee, (707) 436-7228
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
Industrial Emergency Council (IEC), a non -profit organization, coordinates and manages a vocational education program in collaboration with the state community college system that utilizes state funds to reimburse fire agencies for training compl eted by on-duty personnel. For FY 24/25 participation in the program, the Fire Department is requesting a budget adjustment of $67,301.91 in expenses and $67,301.91 in revenue, which would allow the department to spend the revenue earned on unplanned expen ses that have risen throughout the course of the fiscal year.
DISCUSSION
In order to participate and be eligible to receive funding through this program, the Fire Department must designate an Instructor of Record through IEC who is responsible for maintaining, auditing, and submitting accurate department training hours. The department’s Training Battalion Chief serves in this capacity , and the Training Division manages the incoming funds. At fiscal year end , the department will have earned $67,301.91 for t he corresponding summer, fall, winter, and spring semesters. As the department already maintains training
records, participation in the program requires little additional administrative effort in exchange for significant funding to offset unexpected costs throughout the year.
FINANCIAL IMPACT
Since funding earned through the program can vary significantly, the department did not budget for the revenue at the time of budget adoption. To have a balanced request with a net neutral impact, the department has waited until the spring semester figures were released to make a budget adjustment request to revenue of $67,301.91 (10055200) for fiscal year (FY) 2024-2025.
The department intends to utilize the funds to offset a variety of costs, including personal protective gear and equipment that will be critical for the upcoming fire season, in keeping staff safe while optimizing service delivery in our community. The department is requesting an offsetting expense adjustment of $67,301.91 (10155200) for FY 2024-2025 IEC participation.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The City Council may choose not to approve the budget adjustment, but then the Fire Department would need to forgo purchasing much needed equipment and personal protective equipment that are critical for firefighter safety and effective operational performance.
COORDINATED WITH
City Manager’s Office and Finance Department
STAFF CONTACT
Taylor Armour, Administration Division Manager
(707) 428-7593
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
CITY OF FAIRFIELD
RESOLUTION NO. 2025-101
APPROVING A NET NEUTRAL GENERAL FUND BUDGET ADJUSTMENT TO THE FISCAL YEAR 2024-2025 BUDGET FOR THE FIRE DEPARTMENT RESULTING FROM PARTICIPATION IN THE
INDUSTRIAL EMERGENCY COUNCIL PROGRAM
WHEREAS, the Fairfield Fire Department is eligible to participate in the Industrial Emergency Council (IEC) training program; and
WHEREAS, IEC, a non -profit organization, coordinates and manages a vocational educational program in collaboration with the state community college system that utilizes state funds to reimburse fire agencies for training completed by on-duty personnel; and
WHEREAS, for fiscal year (FY) 2024-2025 participation in the progra m, the Fire Department is requesting a budget adjustment of $67,301.91 in expenses and $67,301.91 in revenue; and
WHEREAS, the revised appropriation constitutes an update to the FY 2024 -2025 Budget approved pursuant to Resolution No. 2024-132 and 2024-133.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. A budget adjustment of $67, 301.91 in revenue and expenses is hereby approved for the Fire Department in FY 2024-2025 as a result of their participation in IEC’s training program.
Section 2. The city manager and Finance Director are hereby authorized to do all things necessary and proper to implement this resolution.
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________
_________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
Agenda Item No: K.1
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: CD Consultant Services Agreement for a New Downtown Fairfield Property-Based Improvement District or Community Benefit Improvement District
Consideration of a Consultant Services Agreement with New City America, Inc. for Investigation of and Potential Formation of a New Downtown Fairfield Property -Based Improvement District or Community Benefit Improvement District
Funding Source: $34,000; Fund to be Determined
Contact: David Zellers, (707) 428-7436
RECOMMENDED ACTION
Receive report, open discussion, and provide direction to staff.
STATEMENT OF ISSUE
Since termination of services with the Downtown Mainstreet Association, there has not been a central coordinating entity for business improvement services in downtown Fairfield. Formation of a Property -Based Improvement District (PBID) or Community Benefit Improvement District (CBID) can create a sustainable funding source for property/business owners to enhance downtown. New City America, Inc. manages processes to explore the establishment of districts to enhance business services.
DISCUSSION
The Downtown Parking and Business Improvement Area (PBIA) was established in 1971 by the City of Fairfield as a BID funded by assessments on businesses in the downtown area , with a volunteer committee of assessed businesses serving as an advisory board and adm inistrator of district services under City Council oversight. In 2010, the City changed the oversight model of the PBIA and entered into a contractual agreement for the newly formed nonprofit Fairfield Mainstreet Association to manage and administer the PB IA funds to provide business support and Main Street beautification and promotional services to the Downtown. In 2021, the City of
Fairfield terminated contracts with the Fairfield Mainstreet Association and brought in -house business support services. Using PBIA annual assessment revenues of $30,000 supplemented by City funding of $130,000 annually from Intergovernmental Services (IGS), the City currently provides services that include event coordination for large and small downtown community events such as 4th of July and Tomato and Vine Festival, Maykers Market, Taste of Downtown, as well as funding a part-time contracted position for coordination with downtown businesses.
In 2023, City Council discussed the exploration of a PBID as a strategy to further enhance revitalization efforts in downtown. Based on conversations and feedback with property owners at the time, there was little appetite to form a new assessment district such as a PBID. With the current investment in infrastructure throughout the Heart of Fairfield, as well as a desire for enhanced services downtown, it may be appropriate to more formally analyze the feasibility of a new PBID for downtown.
PBIDs are a type of Business Improvement District (BID) that levy assessments on properties to fund special benefit services within a defined area. These districts are typically managed by an organization comprised of representatives from the property owners and businesses within the district. This allows assessed property owners and their business te nants to direct the types of special benefit services they feel will most positively improve the district and increase commerce in their businesses. Typical services include maintenance, like cleaning sidewalks, trash removal, enhanced landscaping, private security services, events, marketing and promotions on social media, and public space development. Visit Fairfield is a type of BID focused on tourism, funded with assessments paid by guests at Fairfield hotel businesses, and where the local hoteliers and tourism businesses serve as the board of directors. Since California ’s 1965 BID Law first allowed BIDs in the state,
https://www.fhwa.dot.gov/ipd/pdfs/value_capture/strategies_in_practice/ca_business_improv ement_districts.pdf, hundreds of BIDs have been formed, with current average annual property assessments ranging from $250,000 to $1,350,000, and the larger BIDs , like the San Francisco Tourist Improvement District, generate annual assessments of $27 million each year.
To explore whether a PBID may be of interest to property owners and businesses, and to determine the technical and financial needs of forming a district, staff recommends hiring an expert to conduct outreach and engagement with the community. No decision on the formation of a PBID is being made at this time. The item before the c ouncil is whether to pursue a consultant-led detailed investigation into the support needed and the feasibility of forming a PBID.
New City America (NCA) is a leading firm in the creation and management of BIDs and community benefit districts, with a 30 -year track record of establishing nearly 100 such districts across the United States. Known for its comprehensive approach —from conce ptual planning to implementation and management —NCA has developed unique expertise in forming financing mechanisms and organizational structures that support thriving commercial areas and achieve dynamic business district goals.
NCA currently manages 7 dis tricts statewide: Little Italy/San Diego, Downtown Hayward, Downtown Glendale, Downtown Chula Vista, Historic Lincoln Heights Industrial Zone PBID, Downtown El Cajon , and the East Village Association/Downtown San Diego. New City America has managed San Diego’s Little Italy district for the past 30 years, winning awards and recognition for urban renewal.
NCA’s capabilities go beyond formation . It offers continued district management until local leadership is established and assists in setting up governance structures like boards of directors and management corporations. With nearly 30 district formations in the Bay Area alone since 2000, NCA has had ample success in the region. By the end of 2024, the districts it formed collectively generated over $120 mill ion in annual revenue. Headquartered in San Diego, NCA maintains a strong presence in Northern California, enabling responsive engagement with local stakeholders.
Scope of Work and Implementation Strategy
Downtown Fairfield Property-Based Business Improvement District/Community Benefit Improvement District Investigation Process
Phase 1 Tasks – Downtown Fairfield CBID Investigation
Task Comment Estimated Time
TASK 1
Prepare a feasibility
analysis for creating a
successful Downtown
Fairfield Stakeholders
group to include
various options on the
district boundaries.
NCA would commence the process
with one-on-one meetings with
property owners and businesses.
Examine documents relative to the
current situation in Downtown.
June
Meet with City
officials to review the
process and timeline
for a possible district
formation timeline.
TASK 2
Create a new Downtown
Fairfield Business
Improvement District
(BID) Steering Committee
made up of property and
business owners, conduct
outreach meetings to
obtain feedback from
property owners,
business owners and
other key stakeholders
on the BID effort.
NCA will conduct outreach and
engage with the stakeholders and
the new Downtown Fairfield BID
Steering Committee to determine
stakeholder needs, and conduct a
district SWOT analysis
NCA will distribute an online
survey via email and postal mail
and gather responses from a
majority of property owners in
the study area.
The survey will draw out support
and opposition to the concept of a
special assessment district and
June – July
Database created
based upon
presumed
boundaries
Survey mailout out
and tabulated on a
parcel map
Survey questions
prioritized
Discussion of
options and
Recommendations
made to the
Steering
provide critical data for contacting
property owners in the future.
At least three district-wide
meetings and three steering
committee meetings will be held
to go over the BID outreach
concept, survey review and
determination of the final fate of
the investigation.
Committee based
upon survey
responses
TASK 3
Take in the results of the
survey of property owners
and present them to the
City and the BID Steering
Committee. Meet with
property owners as
needed.
NCA has a unique program for
showing the levels of support and
gauging which priority services the
City and property owners would want
to see. NCA would map it out and
present it to the Steering Committee
July – August
Finalize survey results
and findings, make
recommendations to the
City and the Steering
Committee
TASK 4
Write a report to the
City on the results of the
investigation,
recommended
timeline, and feasibility
of formation.
If the survey response supports the
creation of a new BID, the final report
will include three options for services
and costs that would be viable. NCA
will work with the City to review the
various options, probably the PBID act
of 1994, to fund special benefit
services in Downtown Fairfield.
September
NCA would use the survey to reveal the levels of survey support and/or opposition to the creation of this new financing mechanism district. A parcel analysis that would take into account linear frontage, lot size, and building square footage of each parcel. The revenue would be based on an annual assessment amount generated.
If the investigation determines that the weighted property owners are open to the idea of a property assessment district to fund special benefit services, then NCA would give three options for services and costs.
Additional Phases of work will only occur if there is sufficient support from the surveyed property owners in forming a PBID and staff will bring back a discussion item to council with the timeline for the district formation process.
FINANCIAL IMPACT
This would be a performance -based contract with a monthly retainer amount of $8,500, estimated not to exceed $34,000 from the commencement of the contract to the end of the investigation study of a possible district.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose not to approve any exploration of a Property -Based Improvement District (PBID). If such direction is given, then the Downtown PBID/CBID project would be suspended, and no further action is necessary.
COORDINATED WITH
Community Development, City Manager’s Office, and Public Works
STAFF CONTACT
David Zellers, Community and Economic Development Manager (707) 428-7436
[email protected]
ATTACHMENTS
Attachment 2: Proposal
Corporate Office ▪ 710 W. Ivy St. ▪ San Diego, CA 92101 ▪ 619-233-5009 ▪ Fax 619-239-7105 New England Office: 42 Pearl Street ▪ New Bedford, MA ▪ 02740 [email protected] ▪ www.newcityamerica.com ▪ Facebook: New City America, Inc.
March 24, 2025
Savita Chaudhary
Assistant City Manager
City of Fairfield
1000 Webster Street Fairfield, CA
94533
Sent via e-mail: [email protected]
SUBJECT: Proposal for the Investigation of a New Downtown Fairfield Property Assessment District (Community Benefit Improvement District)
Dear Ms. Chaudhary:
Thank you for reaching out to me regarding the discussion on the improvement of Downtown Fairfield and a possible new property assessment district to aid the City in the improvement to Downtown Fairfield. This proposal will outline what the scope of services would be for such a study and implementation.
New City America has perhaps created and managed more districts statewide than any other company over the past 25 years. We are the only company which can simultaneously do the following:
• Investigate and establish BIDs and Community Benefit Districts; • Help to set up the new Board of Directors and management corporations of the entities who will run the district;
• Manage the district until such time that a full time Executive Director has been hired;
We currently manage 7 districts statewide: Little Italy/San Diego, Downtown Hayward, Downtown Glendale, Downtown Chula Vista, Historic Lincoln Heights Industrial Zone PBID, Downtown El Cajon and the East Village Association/Downtown San Diego. New City America has managed San Diego’s Little Italy district in the past 30 years winning awards and acknowledgements as follows:
2 • Was identified as a “Smart Community” when San Diego was designated as National Geographic International Television series on World Smart Cities. Was designated in April 2010 as the “Smart Growth Community of the Decade” by the Urban Land Institute San Diego/Tijuana Chapter.
• Was named the 10th most popular neighborhood for Millennials in the US today (Forbes Magazine, April 2014);
• Was named the most kid friendly neighborhood in Downtown San Diego by Red Tricycle Magazine in May 2015
• Was featured in Entrepreneur Magazine as one of the most dynamic growing districts in the US today; (2017)
• Was considered to be the leader in COVID response for restaurants throughout San Diego County in the summer of 2021;
• Was one of the only districts in Southern California which did not lose one restaurant, café or bar due to the forced government shut down during COVID; • Was recently acknowledged as having the 4th best Certified Farmers Market in the US;
• Was recently acknowledged to have one of the most successful weekend “Art Walks” in the US today;
• Has created nearly 25 Charter City enabling ordinances that are considered superior to the current Property Business Improvement District laws allowable under the California Streets and Highway Code. • Formed one of the largest Tourism Improvement Districts in the state of California through San Francisco Travel;
• Has been the leader nationwide in designing, funding and managing new public spaces in the many districts it manages.
Our strategy for working in Downtown Fairfield for the investigation and possible formation of a PBID/CBID would be as follows:
1. Meet first with City staff and then with Downtown Fairfield stakeholders and property owners to explain the purpose of the new assessment district - Community Benefit Improvement District, (CBID), formation process and the relevant timeline to achieve these goals. Give examples of other successful Downtowns that have used Special Benefit Districts to accelerate their reinvention and redevelopment.
2. With direction from City staff and the Downtown Fairfield business and property owners, work with all the key players to create a stakeholders based Downtown Fairfield CBID Steering Committee. The first task of the Steering Committee would be to set boundaries for a CBID study area in Downtown Fairfield.
3. Work with that new Downtown Fairfield CBID Steering Committee to oversee a mailed survey to all property owners in the proposed district ascertaining their conceptual support for the creation of a special benefits district.
4. Use the survey to reveal the levels of survey support and/or opposition to the creation of this new financing mechanism district.
3 If there does seem to be conceptual support for this new Downtown Fairfield Property Assessment District (CBID), we would discuss the timeline for the district formation process, which would be formed ideally by the Spring of 2026.
This would be a performance-based contract with a monthly retainer amount of $8,500, estimated not to exceed $ 34,000 from commencement of the contract to the end of the investigation study of a possible district. The estimated period to form this district would be 4 months from the date of commencement.
New City America is one of the only companies nationwide that has demonstrated its knowledge of conceptualizing a program, developing a strategy and creating the end result through a new financing mechanism and organization to achieve dynamic business dist rict goals. In terms of qualifications, please review following relevant facts:
• New City America has formed 98 similar districts throughout the United States over the past 24 years, perhaps more than any other company in the US. We anticipated forming five more similar districts the Spring of 2025. We have formed more similar property assessment districts in the Bay Area, than any other company, reaching almost 30 formations since 2000.
• The districts that are currently functioning throughout the country, formed by New City America, collectively generated over $1 20,000,000 in annual revenues at the end of 2024.
• Being based in San Diego and our current work in the Bay Area , allows for direct access to business and property owners for a quick response to anyone’s questions.
We hope that you find this proposal to be responsive to your request and look forward to being interviewed by you and your staff to move forward with this study of a Downtown Fairfield Community Benefit Improvement District.
Sincerely,
Marco Li Mandri
President,
New City America, Inc.
www.newcityamerica.com
www.littleitalysd.com
www.downtownglendale.com
www.downtownchulavista.com
4
4 SCOPE OF WORK PROGRAM
Detailed Scope of Work and Budget for the
Downtown Fairfield Property Business Improvement
District/Community Benefit Improvement District
(CBID) Investigation Process
Phase 1 Tasks – Downtown Fairfield CBID Investigation
Task Comment Estimated Time
1. Prepare a feasibility analysis
for creating a successful
Downtown Fairfield
Stakeholders group to include
various options on the district
boundaries.
We would commence the process
with one on one meetings with key
property owners and businesses.
Read documents relative to the
current situation in Downtown
June
Meet with City officials to
go over the process and
timeline for a possible
district formation timeline.
2. Create a new Downtown
Fairfield Community Benefit
Improvement District (CBID)
Steering Committee made up of
property and business owners,
conduct outreach meetings to
obtain feedback from property
owners, business owners and
other key stakeholders on the
CBID effort.
NCA will work with the
stakeholders and the new
Downtown Fairfield CBID Steering
Committee and will present a
written survey for response by
property owners. The survey will
draw out support and opposition to
the concept of a special
assessments district and provide
critical data for contacting property
owners in the future. At least three
meetings will be held to go over
the CBID outreach concept, survey
review and determination of the
final fate of the investigation
June - July
-Database created based
upon presumed
boundaries
-Survey mailout out and
tabulated on a parcel map
-Survey questions
prioritized
-Recommendations made
to the Steering Committee
based upon survey
responses:
3. Take in the results of the
survey of property owners and
present them to the City
Manager and the CBID Steering
Committee. Meet with property
owners as needed.
NCA has a unique program for
showing the levels of support and
gauging which priority services the
City and property owners would
want to see. We would map it out
and present to the Steering
Committee
July – August
- Finalize survey results
and findings, make
recommendations to the
City and the Steering
Committee
4. Write a report to the City
Manager on the results of the
investigation, recommended
timeline, and feasibility of
formation.
If the survey response supports the
creation of a new CBID, work with
the City Manager’s office to review
the various options, probably the
PBID act of 1994, to fund special
benefit services in Downtown
Fairfield.
September
Estimated Costs for
Investigation of Downtown
Fairfield CBID
$ 34,000
($8,500 x 4 months)
5 Term of Agreement:
Commencing in June 2025, and concluding at the end of September 2025, unless continued through mutual agreement of both parties. Both parties shall retain the right to withdraw from the agreement with cause, with a 30-day written notice. This is a performance based agreement
Costs:
Retainer payment, $ 8,500.00 per month, is due and payable upon review and receipt with a four-month minimum to carry us through the investigative stage of the study. If the CBID Steering committee and City Manager agree not to pursue the formation of the district, the contract will conclude in September 2025. It is anticipated that this full agreement will not exceed $ 34,000 for the term of the contract. Checks will be made out to:
New City America, 2011 W. California Street, San Diego, CA 92110
New City America has 14 staff members working throughout the state. Marco Li Mandri, President, would be the main point of contact for the City of Fairfield. Our staff will handle all aspects of the district investigation and formation process.
Marco Li Mandri – Chief Executive Officer, Marco Li Mandri will be the main point of contact for the Downtown Fairfield Assessment District Project Shirley Zawadzki – Chief Operating Officer
Laura Li Mandri – Controller and Chief Financial Officer Monica Montes – Database, survey compilation
Chris Gomez – Design and Layout
Jerry Klink – Mapping (sub-contractor)
Dominic Li Mandri – District Management support
Joey Li Mandri, Business Liaison, Communications
Ryan Huffman, Administration (Glendale)
Michelle Mercado – Communications
Nick Angulo – Event planning
Nick Yoo – Asst. District Manager, Hayward
Ed Henning – Independent Assessment Engineer
NCA Personnel who may
work on the Downtown
Fairfield Project
Title and involvement in
this investigation and
formation of a CBID in
Downtown Fairfield
Years in
this Field
Years with
New City
America
Marco Li Mandri
[email protected]
President, Project Manager,
Key personnel of the effort
30 Since 1995
Shirley Zawadzki
[email protected]
Assistant Project Manager 29 Since 1996
Chris Gomez
[email protected]
District Management Officer,
Graphics
24 Since 2001
Laura Li Mandri
[email protected]
Controller of Corporation,
Administration
20 Since 2005
6 Monica Montes
[email protected]
Database work, meeting
coordinator
22 Since 2003
Jerry Klink
[email protected]
Mapping, graphics, public
space design, assist in
meeting coordination
10 Since 2015
Dominic Li Mandri District
outreach/Management
11 Since 2014
References
Public sector client references within the last 3 years Public Sector Client References (for the last 3 years)
1. Mr. Kelly McAdoo, City Manager, City of Santa Barbara, (510) 209-2247
2. Ms. Christine Connelly, Deputy Mayor, City of New Bedford MA (508) 979-1410
3. Ms. Christine Bibler, Deputy Mayor for Economic Development/City of San Diego (619) 236-6550
4. Mr. Chris Corgas, Mayor’s Office of Economic Development/City of San Francisco, CBD Coordinator for the City, (415) 554-6661
5. Ms. Jennifer Hiramoto, Economic Development Director, City of Ontario (909) 816-8174
6. Mr. Alex Nguyen, City Manager of Oxnard, (510) 541-9941
7. Mr. Ben Martinez, City Manager of National City, (562) 665-5067
8. Ms. Barbara Harb, Economic Development Director, City of Manteca. (209) 914-3519
9. Mr. Tom Williams, City Manager of Millbrae, (650) 784-3434
PBID/CBD District Management Corporations
1. Little Italy Association/San Diego- Mr. Steve Galasso, President (619) 234-6767
2. Downtown Hayward Association - Mr. Resti Zaballos, President (510) 719-5979
3. Downtown Glendale Association - Mr. Rick Lemmo, Vice President (805) 469-2255
4. Lincoln Heights Industrial Zone-Mr. Seth Polen, President (213) 595-5726
5. East Village Association-Ms. Sarah Potter, President (619) 860-1210
6. Downtown Chula Vista Association-Dr. Q, President (619) 791-5064
7. Downtown Santa Barbara Improvement Association, David de L’Abre, President (805) 698-8750
8. Downtown El Cajon PBID, Mr. Chris Berg City Liaison, (805) 509-0382
Agenda Item No: K.2
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: CM City Council Fiscal Year 2025-2027 Strategic Goals and Priorities
Funding Source: N/A
Contact: David Gassaway, (707) 428-7400
RECOMMENDED ACTION
Receive report, open discussion, and provide direction to staff.
STATEMENT OF ISSUE
Each year, the City Council holds a strategic goal -setting session to identify goals and priorities for the City in the coming year. Goal setting helps the City to establish, prioritize, or reform programs and projects for the coming fiscal year.
DISCUSSION
In January 2025, the City Council, the Senior Leadership Team (SLT), and other key staff members held a two-day strategic goal-setting workshop. During both days, the council and staff discussed a long -term vision for the City, reviewed the six existing overarching goals, and prioritized numerous other objectives for the coming two fiscal year (FY) cycle. Following the workshop, SLT worked to expand on the objectives with various strategies and create a strategic goals document to highlight City priorities in the coming two year fiscal cycle.
In January 2024, staff presented the initial launch of the transparency portal for tracking the City Council goals and Priorities. The portal shared information about the council in a story map called “Know your Council ,” Council goals and Priorities, including performance reports, and a dashboard for Capital Improvement Projects ( CIP). In January 2025, additional datasets were released, which included the police transparency portal, open data portal, and development projects. As of April 2025, 65.7% of act ion items are complete, and 30.9% are in progress , meaning 96.6% of initiatives are either finished or actively underway.
Currently, the goals from FY 2023 -2025 are listed , and the portal is updated quarterly by staff.
The portal can be accessed by anyone here: https://transparency.fairfield.ca.gov. The strategic goals FY 2025-2027 document will guide City efforts in the coming two fiscal year cycle and identify areas where work is already underway or new programs or projects are needed. All current items with the status of “cancelled ,” “ongoing activities ,” or “completed” will not be carried over, and details will be reta ined in the published quarterly performance reports. The new items and the existing items in the status of “Not started” and “In Progress” will continue to be tracked as a new dataset for the upcoming two fiscal year cycle.
The performance report for April to June will be uploaded to the transparency portal in July 2025.
The goals and priorities for the new two -year fiscal cycle will be uploaded to the transparency portal effective August 1, 2025. Staff will continue to provide quarterly updates. City management will use the goals and objectives outlined to hold departments accountable in responding to the community's priorities.
FINANCIAL IMPACT
There is no direct financial impact on the approval of the annual goals. However, programs or projects stemming from strategic goals may require financial resources to implement. Those items are already included in the budget or will require additional council authorization as they advance.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
January 24-25, 2025 – Council Strategic Planning Retreat
ALTERNATIVE ACTION
The council may choose not to approve the strategic goals document or provide other direction to staff.
COORDINATED WITH
N/A
STAFF CONTACT
David Gassaway, City Manager
(707) 428-7400
[email protected]
ATTACHMENTS
Attachment 2: City Council Goals and Priorities 2025-2027
City Council
Goals & Priorities
2025 - 2027
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
CITY OF FAIRFIELD 2025-2027 COUNCIL GOALS
An overview of the City Council goals and priorities designed to guide City government operations within the two-year fiscal cycle.
CITY OF FAIRFIELD COUNCIL GOALS
Housing
Provide housing diversity
affordable and accessible to all.
Community Engagement
Increase diversity of opportunity to
engage Fairfield community.
Organizational Excellence
Become a leader in local
government best practices.
Homelessness
Reduce homelessness and the
impacts of homelessness.
Economic Development
Foster Sustainable Economic Growth
Through Innovation, Investment, and
Inclusive Opportunities.
Quality of Life
Elevate Fairfield as the place
to live, work, and play.
GOALS
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
UNDERSTANDING THE CITY OF FAIRFIELD CITY COUNCIL
GOALS AND PRIORITIES DOCUMENT
The City of Fairfield’s Council Goals and Priorities Plan is a formal document adopted by the City Council that translates vision and goals into an actionable strategy that guides the organization’s focus, work, and resource alignment. It is a collaborative effort that is led by the City Council’s vision and leadership, influenced by resident feedback obtained from the Community Survey, reflective of staff contributions, and appropriately aligned with other significant initiatives.
Tactics
Strategies
Objectives
Goals
Mission
Vision
What is the future
for Fairfield we
seek to create?
Why do we exist?
Critical Issues to Deliver on
Vision & Mission
Focused priorities to tackle
within the plan timeline
Short- or Long-term Initiatives
to Deliver on Objectives
Action Steps to be Taken; by whom, by when,
resources needed, and success measures
Staff Driven
Council Driven
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
MISSION VISION VALUES
Mission
To foster a sense of pride in the community, improve the lives of our residents and deliver dependable essential services through integrity, professionalism, and fiscal responsibility.
Vision
Fairfield is a vibrant, safe, clean, affordable, and diverse community with robust commerce and thriving businesses.
Values
Mission
VisionValues
Communication
Diversity
Inclusion
Innovation
Transparency
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
CITY COUNCIL GOALS AND PRIORITIES
The council goals and priorities are distributed across 19 objectives, facilitating the translation of strategic priorities into operational and performance -based goals that are clear, focused, and measurable.
This is not a linear map in which each strategic priority is performed in sequence. Rather, each area is equally important and conducted simultaneously.
Council Priorities:
Homelessness Goal: Reduce homelessness and the impacts of homelessness
Quality of Life Goal: Elevate Fairfield as the place to live, work, and play Economic
Development
Goal: Foster sustainable economic growth through
innovation, investment, and inclusive opportunities.
Housing Goal: Provide housing diversity affordable and accessible to all
Community
Engagement
Goal: Increase diversity of opportunities to engage the Fairfield community
Organizational
Excellence
Goal: Become a leader in local government best practices
IMPLEMENTATION
The timeline for implementation will vary based on many factors, including the complexity of the objective, partner and community input, workforce capacity, budget availability, and coordination with City partners. Regular reviews of the implementation plans will ascertain their effectiveness in achieving the milestones outlines in the objectives and strategies.
The City's Council Goals Performance Dashboard is designed to:
Share progress toward realizing the City Council’s goals with the Community. Assist City management and Council in making data-driven decisions on key priority areas.
Enhance government accountability and transparency.
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Homelessness
Goal: Reduce homelessness and the impacts of homelessness Objective HM 1- Programs and Services for Addressing
Unsheltered Homelessness
HM 1.1- Partner with nonprofit agencies on sustainable solutions to get people off the street
HM 1.2- Identify and secure funding sources to support permanent solutions
Objective HM 2 – Improve Systems Coordination
HM 2.1 - Partner with provider agencies to break down silos and improve services coordination and coordinated entry system
HM 2.2 - Identify and reduce systemic barriers
Objective HM 3 – Support CAP Solano
HM 3.1 - Assist in implementing CAP Solano’s staffing plan to expand regional capacity HM 3.2 - Support CAP Solano staff with improving regional homeless response systems HM 3.3- Assist CAP Solano staff in implementing Results Based Accountability (Results from Investment) across county wide system of care
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Quality of Life
Goal: Elevate Fairfield as the place to live, work, and play Objective QL 1 – Strengthen Public Safety and Emergency Response
QL 1.1 - Finalize EMS Countywide Ambulance Transportation Contract QL 1.2 - Establish Analysis & Real-Time Intelligence Center (ARTIC) to support data- informed public safety operations
Objective QL 2 – Improve Infrastructure and Enhance Community Spaces
QL 2.1 - 2030 N. Texas Street - Execute operating MOU with First 5 for programming at the new Community Center
QL 2.2 - Finish Fire Station 36 & 39 - Complete construction of Fire Stations 36 and 39 through concurrent bidding to maximize cost efficiency
QL 2.3 - Complete Water Utility Master Plan and conduct Water Rate Study QL 2.4 - Improve and upgrade local transit service
QL 2.5 - Digital Inclusion, Equity and Broadband Infrastructure QL 2.6 - Vanden/Canon Road Overcrossing project
QL 2.7 - Markeley Lane - Planning, design, right-of-way acquisition, and environmental permitting to develop shovel-ready construction documents QL 2.8 - Develop new Soccer Complex to enhance recreational opportunities
Objective QL 3 – Programs and Services
QL 3.1 - Support Travis Air Force Base
QL 3.2 - Explore implementation of Micro Grid systems for energy resilience QL 3.3 - Develop and implement action plan based on Parks Master Plan results QL 3.4 – Modernizing the Municipal Code to address issues of Blight such as Rental Housing Inspection, Food Trucks, Tobacco retailers, and N. Texas cleanup
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Economic Development
Goal: Foster sustainable economic growth through innovation, investment, and inclusive opportunities.
Objective ED 1 – Improve Infrastructure
ED1.1 - Finalize North Texas grant program for property improvements o Explore inclusion of parking lot lighting, business signage, and landscape softening
o Fund porter service pilot program in partnership with NTSBA for more frequent cleanups
ED 1.2 - Enforce citywide smoke shop moratorium
o Target illegal sales and over-concentration along N. Texas corridor ED 1.3 - Implement Texas Streetscapes Plan – Phase 1 and 1A ED 1.4 - Complete Water Utility Infrastructure upgrades in Downtown ED 1.5 - Launch W. Texas Complete Street Project
ED 1.6 - Advance Streetscape Plan Phase 2: Corners & Pavement Overlay
Objective ED 2 – Advance Commercial Development and
Investment Readiness
ED 2.1 - Complete comprehensive update to the Zoning Code ED 2.2 - Document and streamline the development workflow ED 2.3 - Define specific redevelopment objectives for the targeted development areas (ex. Solano Town Center) and work with property owners on action plans where appropriate
ED 2.4 - Strengthen partnerships with universities, capital providers, and regional innovation assets to connect R&D with targeted industry recruitment
Objective ED 3 – Promote Placemaking, Business Retention, and District Activation
ED 3.1 - Coordinate with partners to expand support for small business events ED 3.2 - Increase public art and art-based programming ED 3.3 - Conduct business walks to support retention and outreach ED 3.4 - Release RFP for Downtown Theatre activation
ED 3.5 - Engage with agricultural organizations (ex. Farm Bureau) to support food sector cluster development and advocacy efforts
ED 3.6 - Explore naming rights opportunities for local assets ED 3.7 - Establish sustainable funding mechanism for Downtown (e.g., PBID – Property Based Improvement District)
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Housing
Goal: Provide housing diversity affordable and accessible to all Objective HS 1 – Increase Revenue for Affordable Housing Development
HS 1.1 - Develop an Inclusionary Housing Policy to support long-term affordability HS 1.2 - Dispose of Successor Agency properties to replenish low/moderate-income housing funds and create new housing opportunities - Target Properties: Sem Yeto and Hwy 12
Objective HS 2 – Initiatives to Reduce Housing Barriers HS 2.1 - Implement programs that promote community development and expand housing access
HS 2.2 - Strengthen participation in the Section 8 Housing Choice Vouchers Program
Objective HS 3 Develop and Preserve Mixed-Income and
Affordable Housing
HS 3.1 - Provide City subsidies and sponsorships for the development of housing for extremely low- to moderate-income households
HS 3.2 - Secure funding and move forward with the Tabor Commons Project HS 3.3 - Support preservation of small and large multifamily housing developments HS 3.4 - Collaborate to address Travis AFB housing needs, including support for VASH vouchers
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Community Engagement
Goal: Increase Diversity of Opportunity to Engage Fairfield Community Objective CE 1 – Increase Outreach
CE 1.1 - Solicit community feedback through multiple platforms CE 1.2 - Launch “FF101 Roadshow” to inform and engage residents about City operations and services
CE 1.3 – Educate community on the city’s financial position CE 1.4 – Educate community on LLMD 218 process
Objective CE 2 – Enhance Presence at Community Events
CE 2.1 - Provide staff presence and active support at community events to build trust and strengthen relationships with residents
Objective CE 3 – Intentional Communications Campaign
CE 3.1 - Promote the City’s achievements through targeted marketing and storytelling CE 3.2 - Develop and publish an Annual Report to highlight progress and impact
City of Fairfield
City Council Goals and Priorities – Fiscal Year 2025-2027
Organizational Excellence
Goal: Become a Leader in Local Government Best Practices Objective OE 1 – Retain, Recruit, and Develop an Empowered, Engaged, and Diverse Workforce
OE 1.1 - Implement a comprehensive employee engagement strategy OE 1.2 - Create a formal succession and promotion plan to support career growth and leadership development
OE 1.3 - Launch PERFORM, LEARN systems for performance evaluations and learning management
Objective OE 2 – Develop Strong and Effective Systems and Processes
OE 2.1 - Technology Infrastructure Modernization
OE 2.2 - Implement Cyber Resilience Plan (CRP)
OE 2.3 - Implement Geographical Information Systems (GIS) Master Plan
Objective OE 3 – Enhance the Customer Experience
OE 3.1 - Modernize City applications to improve user accessibility and service delivery OE 3.2 - Improve data driven decision making & information sharing across departments and with community
Objective OE 4 – Ensure Fiscal Sustainability
OE 4.1 - Continue identifying opportunities for providing cost savings with City services OE 4.2 - Continue identifying and pursuing opportunities to increase City revenues
Agenda Item No: L.1
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: HR Public Hearing Regarding Vacancies for Calendar Year 2024
Recruitment and Retention Efforts for Calendar Year 2024 as Required Under Assembly Bill 2561/Government Code Section 3502.3 Regarding Vacancies
Funding Source: N/A
Contact: Angela Broaddus, (707) 428-7396
RECOMMENDED ACTION
Receive report and hold public hearing.
STATEMENT OF ISSUE
Assembly Bill (AB) 2561 requires public agencies, including the City, to conduct at least one public hearing per fiscal year to report on staffing vacancies , recruitment, and retention efforts. This communication, along with the accompanying presentation, satisfies the City’s legal obligations under the new law, which took effect on January 1, 2025. The presentation is informational in nature and provides an update on the status of the City’s vacancies, recruitment initiatives, and employee retention strategies for calendar year 2024.
DISCUSSION
AB 2561 was enacted to address the growing challenge of job vacancies in local government, which can hinder the delivery of public services and increase employee workload. The legislation requires public agencies to hold a public hearing before their governing body at least once per fiscal year, prior to adopting the next fiscal year’s budget. During this hearing, agencies must present information on current vacancies, recruitment and retention efforts, and identify potential changes to policies, procedures, or recruitment practices that may create barriers in the recruitment and selection process. AB 2561 was signed into law and codified as Government Code section 3502.3, effective January 1, 2025. To comply with these new l egal requirements, the City must:
1. Report on vacancies by holding a Public Hearing: For calendar year 2024, the City’s average annual vacancy rate for regular full -time equivalent positions is 6.4%. The table below provides a month -by-month breakdown of va cancy rates for regular full -time equivalent positions:
2024 Jan Feb Mar Apr May June
# of Vacancies
Beginning of the
Month
10 10 3 8 10 8
# of Vacancies Filled 6 14 3 16 8 13
# of Budgeted FTEs 606 606 606 606 606 606
% of Vacancies 8.4% 7.8% 7.8% 6.4% 6.8% 6.1%
2024 July Aug Sep Oct Nov Dec
# of Vacancies
Beginning of the
Month
9 11 5 8 12 8
# of Vacancies Filled 13 5 12 8 12 7
# of Budgeted FTEs 595 595 595 597 597 597
% of Vacancies 5.5% 6.6% 5.4% 5.4% 5.2% 5.4%
2. Allow employee organization participation: The City must permit each recognized employee association representing a City bargaining unit to provide input during the public hearing regarding vacancies and efforts related to recruitment and retention. In accordance with Gov ernment Code § 3502.3(b), the Human Resources Department notified six represented bargaining units of the opportunity to participate in the hearing.
The Fairfield Part -Time Employees Association (FPTEA) bargaining unit does not include any regular full -time equivalent positions, as the members in this unit are employed in part-time/temporary/as-needed capacities.
3. Provide additional reporting for high vacancy rates: If vacancies within a single bargaining unit reach or exceed 20% of the authorized full -time positions for that unit, the City is required, upon request from the recognized employee organization representing that unit, to provide additional information during the public hearing. This information must include:
1) the total number of vacancies in the bargaining unit;
2) the number of applicants;
3) the average time to fill positions; and
4) potential opportunities to enhance compensation and working conditions for employees within the unit, in accordance with Government Code § 3502.3(c).
For calendar year 2024, all City bargaining units represented by recognized employee organizations maintained vacancy rates below 20%, as summarized in the table below:
2024 Annual Average Vacancy Rate
Bargaining Unit Percentage
Fairfield Employees’ Association (FEA) 6.1%
Fairfield General Management Association (FGMA) 6.1%
Fairfield Police Officers’ Association (FPOA) 7.4%
Fairfield Police Management Association (FPMA) 0%
Fairfield Professional Firefighters’ Association (FPFA) 0% Fairfield Fire Managers’ Association (FFMA) 0%
While not re quired for purposes of AB 2561, the vacancy rates for the City’s unrepresented groups are included below:
Unrepresented Unit Percentage
Non-Management Confidential 14.3%
Confidential Management 7.7%
Executive 0%
FINANCIAL IMPACT
There is no direct fiscal impact associated with conducting the public hearing required under Government Code section 3205.3.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
Staff recommends that the City Council receive the presentation for information purposes during the public hearing , at which the City will report on workforce vacancies, recruitment, and retention efforts.
ALTERNATIVE ACTION
Staff has not identified any viable alternatives to the recommended action.
COORDINATED WITH
N/A
STAFF CONTACT
Angela Broaddus, Human Resources Manager
(707) 428-7396
[email protected]
ATTACHMENTS
N/A
Agenda Item No: L.2
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2025-102 PD Parking Fee Schedule
Adding an Additional Section to the Parking Fee Schedule and Adopting the Current Parking Fee Schedule
Funding Source: N/A
Contact: Dan Marshall, (707) 428-7374
RECOMMENDED ACTION
Hold Public Hearing and adopt resolution.
STATEMENT OF ISSUE
Adopt the current fee schedule for parking fines and add an additional violation of 22500(n) of the California Vehicle Code (CVC) with a $58 fine. This updates the parking fee schedule previously updated by the City Council in 2010.
DISCUSSION
In 1993, Assembly Bill (AB) 408 (California Vehicle Code 40200) decriminalized parking citation s and removed the parking citation processing from the courts effective July 1, 1993, thereby making standing or parking citations a civil offense. AB 408 changed the parking violation adjudication process and shifted the responsibility of establishing a schedule of parking penalties for parking violations to the governing bodies within a county, which includes the City Council. A parking fee was created in a resolution and was passed by the council on July 20, 1993, Resolution No. 93-125 (Attachment 3).
On December 7, 2010, Resolution No. 2010-333 (Attachment 4) was passed by the council, which added a $3 increase to all parking offenses listed on the parking fee schedule. This $3 surcharge was established due to the passing of Senate Bill (SB) 857 on December 7, 2010, which increased the amount the City pays to the State of California for every parking citation issued.
Between 2010 and 2023, the parking fines were increased to their current rate of $58.
On October 10, 2023, the State of California pa ssed AB 413, also known as the California Daylighting Bill. AB 413 added a new subdivision to Vehicle Code section 22500. Section 22500(n) prohibits the stopping, standing, or parking of a vehicle within 20 feet of any unmarked or marked crosswalk or 15 feet of any crosswalk where a curb extension is present. This section was added to the CVC to help increase pedestrian safety and hopefully reduce the number of vehicle versus pedestrian crashes. Effective January 1, 2025, vehicles that are in violation of this section can be issued a parking citation.
Since 22500(n) CVC is a new section, the Fairfield Police Department has not yet set a fee amount.
Similar sections, such as 22500(a) CVC -parked within an intersection, 22500(b)CVC-parked over a crosswalk, 22500(e) CVC -Parked blocking a driveway, 22500(f) CVC-parked blocking sidewalk, 22500(h) CVC -double parked, 22500(I) CVC-parked in a bus zone, currently all impose a $58 fee.
The Police Department proposes to impose the same $58 fee on people who are in vi olation of the new section 22500(n) CVC. For any other parking violation listed in the Fairfield Municipal Code or California Vehicle Code and not listed in the proposed schedule, the fine shall be $58 unless otherwise indicated in the body of the statute.
The City’s fee must be comparable to fees issued by other cities in Solano County. The current $58 fee is comparable to surrounding agencies and therefore staff does not recommend increasing the fee amount.
FINANCIAL IMPACT
Additional revenue is generated from the fees collected from parking citations, which are entered into the Police Department General Fund account.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose not to adopt this resolution.
COORDINATED WITH
City Attorney’s Office
STAFF CONTACT
Robert Piro, Police Sergeant
(707) 428-7524
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Resolution No. 93-125
Attachment 4: Resolution No. 2010-333
Attachment 5: Proposed Parking Fee Schedule
CITY OF FAIRFIELD
RESOLUTION NO. 2025-102
ADDING AN ADDITIONAL SECTION TO THE PARKING FEE SCHEDULE AND ADOPTING THE
CURRENT PARKING FEE SCHEDULE
WHEREAS, on July 1, 1993, Assembly Bill 408 was passed, which shifted the responsibility of establishing a schedule of parking penalties for parking violations to the governing bodies within a county; and
WHEREAS, on December 20, 1993, the Fairfield City Council approved the proposed parking fee schedule under resolution No. 93-125; and
WHEREAS, on December 7, 2010, the Fairfield City Council approved a $3 surcharge for each parking fee due to the passing of Senate Bill 857, Resolution No. 2010-333; and WHEREAS, on October 10, 2023, Assembly Bill 413 was passed, which amended California Vehicle Code Section 22500 and added section 22500(n); and
WHEREAS, affective January 1, 2025, people who stop, stand, or park a vehicle within 20 feet of any unmarked or marked crosswalk or 15 feet of any crosswalk where a curb extension is present, are in violation of 22500(n) of the California Vehicle Code (CVC) and can be issued a parking citation; and
WHEREAS, the Fairfield Police Department wishes to add the new section of 22500 (n) of the California Vehicle Code to the current parking fee schedule; and
WHEREAS, the Fairfield Police Department wishes to impose a $58 fine on the newly added section of 22500(n) of the California Vehicle Code, which is a consistent fine associated with other similar parking sections currently on the fee schedule; and WHEREAS, any other parking violation listed in the Fairfield Municipal Code or California Vehicle Code and not listed in the proposed schedule, the fine shall be $58 unless otherwise indicated in the body of the statute.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The updated “Parking Fee Schedule” attached to this Resolution as Exhibit A is hereby adopted as the new parking fee schedule for the City of Fairfield.
Section 2. A violation of California Vehicle Code 22500(n) CVC is added to the City of Fairfield’s “Parking Fee Schedule” (Exhibit A) with a $58 fine.
RES. NO. 2025-102
Section 3. A new “catch -all” parking violation for any other parking violation of the California Vehicle Code not listed in the “Parking Fee Schedule” (Exhibit A) is added with a $58 fine unless otherwise indicated in the body of statute.
Section 4. The Fairfield Police Chief or his designated representative is authorized to do all things necessary to implement this new “Parking Fee Schedule” (Exhibit A), including, but not limited to, creating new forms and procedures for the issuing and enforcement of parking fines and fees in the City of Fairfield.
PASSED AND ADOPTED this 3rd day of June 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS:
ABSENT: MEMBERS:
ABSTAIN: MEMBERS:
MAYOR
ATTEST:
CITY CLERK
CITY OF FAIRFIELD
RESOLUTION NO. 2010 3 3
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FAIRFIELD INCREASING
PARKING CITATION FINES TO REFLECT THE SURCHARGE IMPOSED BY SENATE BILL 857
WHEREAS, Senate Bill 857 ("SB 857") becomes effective December 7, 2010, increasing the surcharge the City pays to the State of California for every parking citation issued; and WHEREAS, SB 857 adds a$3.00 surcharge for each parking offense where a parking penalty, fine, or forfeiture is imposed; and
WHEREAS, in order to offset the increased surcharge for parking citations issued on or after December 7, 2010, the City must increase its parking fines by an additional $3.00 per parking offense.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The City Council of the City of FairField does hereby approve and adopt the Parking Citation Fee Schedule attached hereto as Exhibit 1.
Section 2. The City Manager is authorized to implement this resolution.
PASSED AND ADOPTED this 7th day of December, 2010, by the following vote:
AYES: COUNCILMEMBERS: PxireRimm/ MoylMrazNaccaro
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
MAYOR
ATTEST:
G'` ti2,G - 1
CITY CLERK
S:1City Manager Files\Dave VVParking Citation\CC Fairfield Parking Citation Increase Resolution ( 01).DOCPage 716 of 745 EXHIBIT 1"
CITY OF FAIRFIELD PARKING PENALTY SCHEDULE
Current Current Proposed Proposed
Parking Delinquent Parking Delinquent
Code Section Descri tion Penalt Fee Penalt Fee
10207M 10.207 ( M) MC FIRE LANE 25 50 28 53
10301F 10.301 ( F) MC BUSINESS FIRE EXIT 25 50 28 53
1135B 11.3.5 ( B) MC TOW AWAY ZONE 25 50 28 53
1135C 11.35 ( C) MC NO PARKING SPECIFIED T[ME 25 50 28 53 1157 11. 5.7 MC VEH OVR 5 TONS ON RES STREET 25 50 28 53 117 I 1.7 MC PARKED WITHOUT PERMIT 25 50 28 53
1171 11. 7.1 MC RED CURB 25 50 28 53
1171 A 11.7.1 ( A) MC NO PRK AREA DIVISION ISLAND 25 50 28 53 1171 B 11.7.1 ( B) MC NO PARKING AREA HAZARD 25 50 28 53 1171C 11.7.1 C) MC CONSTRUCTION 25 50 28 53
1171D 11.7.1 D) MC POSTED PERMIT PARKING ONLY 25 50 28 53 1172 I 1.7.2 MC PARKED OVER 72 HOURS 25 50 28 53
1172B 11J.2 ( B MC POSTED NO PARKING 25 50 28 53
1174 11. 7.4 MC REPAIR VEHICLE IN STREET 25 50 28 53
1U6B 11.7.6 ( B) MC EMERGENCY PARKING STOPS 25 50 28 53 18 11.8 MC TIMED PARKING 25 50 28 53
1181 11.8.1 MC TRUCK PKG/LOAD W/FLAMABLE 35 70 38 73
1182 11. 8.2 MC COMM VEH IN RES DISTRICT 25 50 28 53
1183 11.8 ( 3) MC PARKED IN MARKED SPACES 25 50 28 53
1183B 11.8.3 ( B) MC MARKED SPACES NOT PARKED IN 25 50 28 53 185 11. 8.5 MC VEHICLE OVER 5 TONS 25 50 28 53
1186 11. 8.6 MC EXCEEDING HEIGHT LIMIT 25 50 28 53
118A 11.8 A) MC NO PARKING 25 50 28 53
118B 11.8 ( B) MC 2 HOUR PARKING 25 50 28 53
118C 11.8 ( C) MC POSTED NO PARKING INTO SPACES 25 50 28 53 1191 11. 9.1 MC RED ZONE 25 50 28 53
11911 11.9.1 ( 1) MC RED ZONE 25 50 28 53
11912 11.9.1 ( 2) MC WHITE ZONE 25 50 28 53
11913 11.9.1 ( 3) MC YELLOW ZONE 25 50 28 53
11914 1t.91 ( 4) MC GREEN ZONE 25 50 28 53
11915 11.9.1 ( 5) MC HANDICAPPED 275 550 278 553
1192 11. 9.2 MC NO PARKING IN ALLEY 25 50 28 53
12BIOA 12B.12 ( A) MC OFFER FOR SALE ON CITY PROP 25 50 28 53 12B4F 12B-4 ( F) MC LEAVE IN NON-DESIG PARKING 25 50 28 53 1643 16. 4.3 MC ENCROACHMENT ONTO PUB RIGHT 25 50 28 53 21113A 21113 (A) CVC NO PARKING ON PUBLIC GROUNDS 25 50 28 53 2204A 5204 (A) CVC CURR TAGS NOT DISPLAYED 65 130 68 133 225001 22500.1 CVC PARKED IN FIRE LANE 35 70 38 73
22500A 22500(A) CVC PARKED WITHIN INTERSECTION 25 50 28 53 22500AK 22500 A)- K) CVC PROHIBITED STOP 25 50 28 53
22500B 22500(B) CVC OVER CROSSHATCH/CROSSWALK 25 50 28 53 22500E 22500 E) CVC BLOCKING DRIVEWAY 25 50 28 53
22500F 22500 F) CVC PROHIBITED STOP/S[ DEWALK 25 50 28 53 22500G 22500(G) CVC PARKED OBSTRUCTING TRAFFIC 25 50 28 53 22500H 22500 H) CVC DOUBLE PARKED 25 50 28 53
22500[ 22500(I) CVC PARKED BLOCKING ACCESS RAMP 25 50 28 53 22502A 22502 (A) CVC PKD ON WRONG SIDE OF ROAD 25 50 28 53 22502C 22502 (C) CVC NOT PARKED W/IN 18" OF CURB 25 50 28 53 22502E 22502 (E) CVC ONE WAY ST NOT W/IN 18" CURB 25 50 28 53 22505B 22505 (B) CVC VIOLATION OF POSTED SIGNS 25 50 28 53 225078A 22507.8 ( A) CVC PARKED IN DISABLED SPOT 275 550 278 553 225078B 22507.8 ( B) CVC OBSTRUCTING DISABLED SPOT 275 550 278 553 225078C 22507.8 ( C) CVC SPACED 275 550 278 553
225078C2 22507. 8(C)( 2)CVC DISABLED CROSSHATCH 275 550 278 553 22514 22514 CVC FIRE HYDRANT LESS THAN 15 FEET 25 50 28 53 22521 22521 CVC TRACK 25 50 28 53
22522 22522 CVC BLOCKING HANDICAPPED 275 550 278 553
11245-0001 1306742v2.doc
Current Current Proposed Proposed
Parking Delinquent Parking Delinquent
Code Section Descri tion Penalt Fee Penalt Fee
251523D 25.1523 ( D) MC PROHIBITED VEH ADVERTISING SGN 100 200 103 203 27000 27000 CVC CORR 30 60 33 63
27401N 27.401 ( N MC PKD ON L7NIMPROVED SURFACE 25 50 28 53 28000 28000 CVC REFRIG VANS MUST HAVE EXIT 30 60 33 63
5200 5200 CVC NO LIC PLATES-$10 W/PROOF 30 60 33 63
5200A 5200 A CVC NO LIC PLATES-$10 W/PROOF 30 60 33 63
5201 5201 CVC PLATES NO SECURE-$10 W/PROOF 30 60 33 63
5201F 5201 F) CVC REAR LIC PLATE COVER-$10/ PROOF 30 60 33 63 5204 5204 CVC CURR TAGS NOT D[SPLAYED 65 130 68 133
5204A 5204 A) CVC CURR TAGS NOT DISPLAY $] 0/PRF 65 130 68 133 81 8.1 MC FIRE LANE 35 ' 70 38 73
ADM1N ADMIN FEE ADMINISTRATIVE FEE 0 25 X X
FEE
BOUNCE NSF FEE RETURNED CHECK FEE 0 25 X X
CORR CORRECTABLE CORRECTABLE AMOUNT 10 20 X X
AMT AMT
DMV 20100101 DMV ADMINISTRATIVE FEE 0 0 X X
FEEDT
2-
11245- 0001\1306742v2. doc
PARKING FINE SCHEDULE (Updated June 2025)
Section Fine Description
11.3.5(a) MC 58 TOW AWAY AUTHORITY-72 HOURS
11.3.5 (b) MC 58 TOW AWAY ZONE-SIGNS POSTED
11.3.5 (c) MC 58 NO PARKING SPECIFIED TIME/EVENT OR SWEEPING
11.5.7 MC 58 VEH OVR 5 TONS ON RES STREET
11.7.1 (a) MC 58 NO PRK AREA - DIVISION ISLAND
11.7.1 (b) MC 58 NO PARKING AREA - HAZARD
11.7.1 (c) MC 58 NO PARKING AREA - CONSTRUCTION
11.7.1 (d) MC 58 POSTED PERMIT PARKING ONLY
11.7.2 (b)(1) MC 58 PARKED OVER 72 HOURS
11.7.2(b)(2) MC 58 UNCONNECTED TRAILER ON STREET
11.7.2(b)(3) MC 58 IN CITY LOT AFTER BUSINESS HOURS
11.7.2(b)(4) MC 58 PARKED LESS THAN 30FEET FROM CORNER
11.7.2(b)(5) MC 58 DEBRIS ON OR AROUND PARKED VEHICLE
11.7.4 MC 58 REPAIR VEHICLE IN STREET
11.7.6 (b) MC 58 EMERGENCY PARKING STOPS/SPECIAL EVENTS
11.8.1 MC 58 TRUCK PKG/LOAD W/FLAMABLE
11.8.2 MC 58 COMM VEH IN RES DISTRICT
11.8.3 (b) MC 58 NOT PARKED IN MARKED SPACES
11.8.3(c) MC 58 VEHICLE EXCEEDS LENGTH OF MARKED SPACE
11.8.5 MC 58 VEHICLE OVER 5 TONS WHERE PROHIB. BY SIGNS
11.8.6 MC 58 EXCEEDING HEIGHT LIMIT BY SIGNS
11.8 (a) MC 58 NO PARKING-SIGNS OR PAINT
11.8 (b) MC 58 TIMED PARKING
11.8 (c) MC 58 OFF-STREET LOTS-SIGNS/CURBS
11.9.1(a)(1) MC 58 RED ZONE
11.9.1 (a)(2) MC 58 WHITE ZONE
11.9.1 (a)(3) MC 58 YELLOW ZONE
11.9.1 (a)(4) MC 58 GREEN ZONE
11.9.1 (a)(5) MC 363 HANDICAPPED
11.9.2 MC 58 NO PARKING IN ALLEY
12.16(a) MC 58 PRIVATE LOT CLOSED BUSINESS
12B.4(d) MC 58 MUST PARK IN MARKED SPACES IN PARK
12B.4(f) MC 58 MUST PARK BIKE IN BIKE RACK UNLESS FULL 21209(a)1 CVC 48 PARKED IN BICYCLE LANE
21211 (b) CVC 38 BLOCKING BIKE LANE
22500.1 CVC 78 PARKED IN FIRE LANE
22500 (a) CVC 58 PARKED WITHIN INTERSECTION
22500 (b) CVC 58 OVER CROSSWALK
22500 (c) CVC 48 BLOCKING TRAFFIC LANE
22500 (e) CVC 58 BLOCKING DRIVEWAY
22500 (f) CVC 58 PARKED ON SIDEWALK
22500 (h) CVC 58 DOUBLE PARKED
22500 (i) CVC 58 PARKED IN BUS ZONE-SIGNS OR PAINT
22500 (k) CVC 323 PARKED BLOCKING ACCESS RAMP
22500 (n) CVC 58 WITHIN 15/20 FEET OF CROSSWALK
22502 (a) CVC 58 NOT PARKED WITHIN 18IN OF CURB
22502 (e) CVC 58 ONE WAY ST NOT W/IN 18IN CURB
22507.8 (a) CVC 363 PARKED IN DISABLED SPOT
22507.8 (b) CVC 363 OBSTRUCTING DISABLED SPOT
22507.8 (c)(1) CVC 363 OCCUPYING TWO DISABLED SPACES
22507.8(c)(2)CVC 363 DISABLED CROSSHATCH
22514 CVC 58 FIRE HYDRANT LESS THAN 15 FEET
22521 CVC 58 PARKED ON TRAIN TRACKS
22522 CVC 363 PKD WITHIN 3FT OF ACCESS RAMP
27.401 (N) MC 58 PKD ON UNIMPROVED SURFACE
4000(a)(1) CVC 68 EXPIRED REG. $10 W/PROOF
5200 (a) CVC 58 NO LIC PLATES-$10 W/PROOF
5201(a) CVC 58 PLATE NOT SECURE-$10 W/PROOF
5201 (c) CVC 58 OBSTRUCTED PALTE $10/W PROOF
5201.1 (c) CVC 58 REFLECTIVE FILM $10 W/PROOF
5204 (a) CVC 83 CURR TAGS/MONTH AND YEAR NOT DISPLAYED $10/PROOF ** Any parking violation listed in the Fairfield Municipal Code or California Vehicle Code and not listed in this schedule shall have a $58 fine unless otherwise indicated in the body of the statute MC = Fairfield Municipal Code
CVC = California Vehicle Code
Updated April 2025 S:\Patrol Files\Traffic Unit\Parking Enforcement
Agenda Item No: L.3
AGENDA REPORT
DATE: June 3, 2025
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Ordinance 2025-04 FD Fire Hazard Severity Zones
Adding Chapter 8B Fairfield Fire Hazard Severity Zones Recommended by the California State Fire Marshal
Funding Source: N/A
Contact: Steven Conti, (707) 428-7550
RECOMMENDED ACTION
Hold public hearing; waive full reading, read by title only and introduce ordinance for first reading.
STATEMENT OF ISSUE
The California hazard maps are being updated to more accurately reflect zones susceptible to wildfire. New science in local climate data and improved fire assessment modeling are being incorporated to determine hazard ratings.
DISCUSSION
Government Code Section 51178 requires the California State Fire Marshal to identify and recommend areas within the state as Moderate, High, or Very High Fire Hazard Severity Zones based on consistent statewide criteria and the severity hazard expected to prevail in those areas.
On February 24, 2025, the City of Fairfield received the 2025 Fire Hazard Severity Zone (FHSZ) Map from the State Fire Marshal, identifying designated zones within the city’s jurisdiction .
Pursuant to California Government Code Section 51179(b)(3), the City is p rohibited from decreasing the level of fire hazard severity zone identified by the State Fire Marshal for any area within Fairfield, and this adoption is consistent with the model ordinance issued by the State Fire Marshal.
The factors considered in deter mining fire hazard within wildland areas are fire history, flame length, terrain, local weather, and potential fuel over a 50-year period. Outside of wildlands, the
model considers factors that might lead to buildings being threatened, including terrain, weather, urban vegetation cover, blowing embers, proximity to wildland, fire history, and fire hazard in nearby wildlands. This is not a structure loss model, as key information regarding structure ignition is not included. The purpose of the Fire Hazard Severity Zone map is to assist the city of Fairfield, property owners, and the community in understanding areas of elevated fire risk. The designations help guide defensible space requirements, building standards, fire mitigation strategies, and public awareness efforts.
FINANCIAL IMPACT
N/A
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
Pursuant to California Government Code Section 51178.5, the City of Fairfield made the draft updated hazard zone recommendations available for public review and comment within 30 days of receiving them.
ALTERNATIVE ACTION
Pursuant to Government Code Section 51179, local agencies are required to adopt the fire hazard severity zone designations within 120 days of receiving the recommendations from the State Fire Marshal.
COORDINATED WITH
City Attorney’s Office
STAFF CONTACT
Taylor Armour, Administration Division Manager
(707) 428-7593
[email protected]
ATTACHMENTS
Attachment 2: Proposed Ordinance
Attachment 3: Exhibit A – Fire Hazard Severity Zones Map Attachment 4: Exhibit B – Fire Hazard Severity Zones FAQs
CITY OF FAIRFIELD
ORDINANCE NO. 2025-04
ADDING CHAPTER 8B FAIRFIELD FIRE HAZARD SEVERITY ZONES RECOMMENDED BY
THE CALIFORNIA STATE FIRE MARSHAL
THE CITY COUNCIL OF THE CITY OF FAIRFIELD DOES ORDAIN AS FOLLOWS:
SECTION 1. Chapter 8B is hereby added to the Fairfield Municipal Code as follows:
Chapter 8B
FAIRFIELD FIRE HAZARD SEVERITY ZONES
Article I. Designation of Fire Hazard Severity Zones in the City of Fairfield
8B.1.1 Statutory Authorization and Designation of Fire Hazard Severity Zones.
(a) The City Council designates the Fire Hazard Severity Zones as identified by the State Fire Marshal pursuant to Government Code Section 51178. The map, dated February 24, 2025, and approved by the City Council, is hereby incorporated by reference, and entitled “Fairfield Fire Hazard Severity Zones.” The official map is located at the main office of the Fairfield Fire Department, and also accessible electronically on the following website https://www.fairfield.ca.gov/government/city-departments/fire/lra-fire-severity-zone- map;
SECTION 2: Severability. If any section, sub -section, subdivision, paragraph, clause or phrase in this Ordinance, or any part thereof, is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining sections or portions of this Ordinance or any part thereof. Th e City Council hereby declares that it would have passed each section, sub-section, subdivision, paragraph, sentence, clause or phrase of this Ordinance, irrespective of the fact that any one or more sections, sub - sections, subdivisions, paragraphs, sentences, clauses or phrases may be declared invalid or unconstitutional
SECTION 3. This Ordinance shall be effective 30 days following its adoption by the City Council. A summary of this Ordinance shall, within 15 days after passage, be published in accordance with Section 36933 of the Government Code of the State of California with the names of the City Councilmembers voting for and against it.
SECTION 4. Pursuant to Government Code section 51179(c), the Fairfield Fire Marshal or his designated representative shall transmit a copy of this ordinance to the State Board of Forestry and Fire Protection within 30 days of adoption. Pursuant to Government Code section 51179(g), the Fairfield Fire Marshal or his designated representative shall post a notice at the county recorder, county assessor, and county planning agency identifying
ORD. NO. 2025-04
the location of the map provided by the State Fire Marshal pursuant to Government Code section 51178. Finally, the Fairfield Fire Marshal and his designated representatives shall also do any other things required by local or State law to enact the provisions of this law.
INTRODUCED at a regular meeting of the City Council of the City of Fairfield on the 3rd day of June 2025, and
PASSED AND ADOPTED this ___ day of _________________ 2025, by the following vote:
AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________
_________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
City and County boundaries as of 10/22/24 (CA Board of Equalization) CAL FIRE State Responsibility Areas (SRA25_1)
CAL FIRE Fire Hazard Severity Zones (FHSZSRA23_3, FHSZLRA_25_1) Data Sources:
Daniel Berlant, State Fire Marshal, CA Department of Forestry and Fire Protection Joe Tyler, Director/Fire Chief, CA Department of Forestry and Fire Protection Wade Crowfoot, Secretary for Natural Resources, CA Natural Resources Agency Gavin Newsom, Governor, State of CaliforniaThe State of California and the Department of Forestry and Fire Pr
otection make no representations or warranties regarding the accuracy of data or maps. Neither the State nor the Department shall be liable under any circumstances for any direct, special, incidental, or consequential damages with respect to any claim by any user or third party on account of, or arising from, the use of data or maps. and other relevant factors including areas where winds
ha
ve been identified by the Office of the State Fire Marshal as a major cause of wildfire spread.
statewide criteria and based on the severity of fire hazard that is e
xpected to prevail in those areas. Moderate, high, and very high fire hazard severity zones shall be based on fuel loading, slope, fire weather, Government Code section 51178 requires the State Fire
Mar
shal to identify areas in the state as moderate, high,
and very high fire hazard severity zones based on consistent Waterbody
Federal Responsibility
Area (FRA)Unzoned LRA
Incorporated City
Projection: NAD 83 California Teale Albers
Scale: 1:1
08,000 at 11" x 17"
0 1 2 3 4 5 6 7 8Km
0 1 2 3 4 5Mi
Very High High Moderate
Fire Hazard Severity Zones in State Responsibility Area (SRA), Ef
fective April 1, 2024
Very High High Moderate
Fire Hazard Severity Zones (FHSZ) in Local Responsibility Area (LRA), as Identified b
y the State Fire Marshal
Fairfield
80 680
UNINCORPORATED
NAPA CO.
UNINCORPORATED
SOLANO CO.
UNINCORPORATED
SOLANO CO.
12 SUISUN CITY
VACAVILLE
VALLEJO
N A P A C O .
S O L A N O C O .
February 24, 2025
As Identified by the
S
tate Fire Marshal
Local Responsibility Area
Fire Hazard Se
verity Zones
CITY OF FAIRFIELD – SOLANO COUNTY
Exhibit A
Exhibit B
FHSZ Frequently Asked Questions
What do Fire Hazard Severity Zones measure?
The Fire Hazard Severity Zone map reflects “hazard,” not “risk”. The map is like flood zone maps, where lands are described in terms of the probability level of a par琀椀cular area being inundated by floodwaters, and not specifically prescrip琀椀ve of impacts. “Hazard” is based on the physical condi琀椀ons that create a likelihood and expected fire behavior over a 30 to 50-year period without considering mi琀椀ga琀椀on measures such as home hardening, recent wildfire, or fuel reduc琀椀on efforts.
“Risk” is the poten琀椀al damage a fire can do to the area under exis琀椀ng condi琀椀ons, accoun琀椀ng for any modifica琀椀ons such as fuel reduc琀椀on projects, defensible space, and igni琀椀on resistant building construc琀椀on.
What is a Fire Hazard Severity Zone or FHSZ?
Public Resource Code 4202; The State Fire Marshal shall classify lands within State Responsibility Areas into Fire Hazard Severity Zones. Each zone shall embrace rela琀椀vely homogeneous lands and shall be based on fuel loading, slope, fire weather, and other relevant factors present, including areas where winds have been iden琀椀fied by the department as a major cause of wildfire spread.
Government Code 51178; The State Fire Marshal shall iden琀椀fy areas in the state as Moderate, High, and Very High Fire Hazard Severity Zones based on consistent statewide criteria and based on the severity of fire hazard that is expected to prevail in those areas. Moderate, High, and Very High Fire Hazard Severity Zones shall be based on fuel loading, slope, fire weather, and other relevant factors including areas where winds have been iden琀椀fied by the Office of the State Fire Marshal as a major cause of wildfire spread.
Will the new Fire Hazard Severity Zones affect my ability to get or maintain insurance? Insurance companies use risk models, which differ from hazard models, because they consider the suscep琀椀bility of a structure to damage from fire and other short-term factors that are not included in hazard modeling. It is unlikely that insurance risk models would u琀椀lize CAL FIRE Fire Hazard Severity Zones as a factor, but much of the same data that is used in the Fire Hazard Severity Zone model are likely included in the insurance companies’ risk models. However, insurance risk models incorporate many addi琀椀onal factors and that change more frequently than those that CAL FIRE includes in its hazard mapping, which is built to remain steady for the next 10+ years.
General
FHSZ Frequently Asked Questions
When were the maps last updated?
In 2007, CAL FIRE updated the FHSZs for the en琀椀re State Responsibility Area (SRA). Between 2008- 2011 the department worked with local governments to make recommenda琀椀ons of the Very High Fire Hazard Severity Zones within Local Responsibility Area (LRA).
Why are fire hazard severity maps being updated?
The hazard maps are being updated to more accurately reflect the zones in California that are suscep琀椀ble to wildfire. The hazard mapping process will incorporate new science in local climate data and improved fire assessment modeling in determining hazard ra琀椀ngs.
Where do Fire Hazard Severity Zones apply?
Fire Hazard Severity Zones are found in areas where the state has financial responsibility for wildfire protec琀椀on and preven琀椀on, called the State Responsibility Area. More than 31 million acres are in this area. Under Senate Bill 63 (Stern, 2021) Government Code 51178 was amended to also iden琀椀fy the Moderate and High Fire Hazard Severity Zones with the Very High in Local Responsibility Area (LRA).
What are the uses of Fire Hazard Severity Zones?
The zones are used for several purposes including to designate areas where California’s defensible space standards and wildland urban interface building codes are required. They can be a factor in real estate disclosure, and local governments may consider them in their general plan.
What are the key elements of the Fire Hazard Severity Zone model? The fire hazard severity model for wildland fire has two key elements: probability of an area burning and expected fire behavior under extreme fuel and weather condi琀椀ons. The zones reflect areas that have similar burn probabili琀椀es and fire behavior characteris琀椀cs. The factors considered in determining fire hazard within wildland areas are fire history, flame length, terrain, local weather, and poten琀椀al fuel over a 50-year period. Outside of wildlands, the model considers factors that might lead to buildings being threatened, including terrain, weather, urban vegeta琀椀on cover, blowing embers, proximity to wildland, fire history, and fire hazard in nearby wildlands.
FHSZs are not a structure loss model, as key informa琀椀on regarding structure igni琀椀on (such as roof type, etc.) is not included.
General
FHSZ Frequently Asked Questions
How do the Fire Hazard Severity Zone Maps differ from California Public U琀椀li琀椀es Commission (CPUC) High Fire Threat District Maps?
The California Public U琀椀li琀椀es Commission (CPUC) sponsored map, known as "CPUC High Fire Threat District Map” (HFTD), includes similar factors as those in the FHSZ maps, however the CPUC HFTD Map is designed specifically for iden琀椀fying areas where there is an increased risk for u琀椀lity associated wildfires. As such, the CPUC map includes fire hazards associated with historical powerline-caused wildfires, current fuel condi琀椀ons, and scores areas based on where fires start, as opposed to where poten琀椀al fires may cause impacts.
Why is my property in a different zone than the adjacent area, which looks similar? In wildland areas, zone edges are a result of the way zones are delineated. Specifically, zones represent areas of similar slope and fuel poten琀椀al. Zone boundaries divide zones based on geographic and vegeta琀椀on features that align with fire hazard poten琀椀al; although, at a local scale, it may appear that the immediate area is similar on both sides of the edge. The class value within a zone is based on the average hazard score across the whole zone, so areas that are in the same zone but not immediately adjacent to a local area can have an influence on the final zone classifica琀椀on. Classifica琀椀on outside of wildland areas is based on the fire hazard of the adjacent wildland and the probability of flames and embers threatening buildings.
How are Fire Hazard Severity Zones determined?
CAL FIRE used the best available science and data to develop, and field test a model that served as the basis of zone assignments. The model evaluated the probability of the area burning and poten琀椀al fire behavior in the area. Many factors were included such as fire history, vegeta琀椀on, flame length, blowing embers, proximity to wildland, terrain, and weather.
What new data will be included in the new model, and how does this differ from the previous model?
A 2 km grid of climate data covering the years 2003-2018 is being used in the update. The previous model used stock weather inputs across the state to calculate wildland fire intensity scores. The updated model will adjust fire intensity scores based on the most extreme fire weather at a given loca琀椀on, considering temperature, humidity, and wind speed. In addi琀椀on, ember transport is being modeled based on local distribu琀椀ons of observed wind speed and direc琀椀on values instead of using a generic buffer distance for urban areas adjacent to wildlands.
General
FHSZ Frequently Asked Questions
How can I search the Fire Hazard Severity Zone of a property? You can search by address to find your current designa琀椀on on the web at: osfm.fire.ca.gov/FHSZ Why does the model place an emphasis on the spread of embers? Embers spread wildfire because they can travel long distances in the wind and ignite vegeta琀椀on, roofs, a琀?cs (by ge琀?ng into vents), and decks.
Why do waterbodies have a Fire Hazard Severity Zone Classifica琀椀on? All areas in State Responsibility Area, including water bodies, require a Fire Hazard Severity Zone designa琀椀on. The 2007 FHSZ maps zoned all water as Moderate by default. In the 2023 FHSZ model we added a buffer of FHSZ from the surrounding wildland into water bodies to account for poten琀椀al threat of embers to buildings on docks and house boats, as well as varia琀椀on in reservoir height that occurs with drought.
How does CAL FIRE assist Local Governments in Fire Hazard Severity Zones? CAL FIRE’s Land Use Planning Program is a specialized unit that provides support to local governments by providing fire safety exper琀椀se on the State’s wildland urban interface building codes, wildfire safety codes, as well as helping in the development of the safety elements in general plans.
General
FHSZ Frequently Asked Questions
What is State Responsibility Area or SRA?
SRA is a legal term defining the area where the state has financial responsibility for wildland fire protec琀椀on and preven琀椀on. Incorporated ci琀椀es and federal ownership are not included. Within the SRA, CAL FIRE is responsible for fire preven琀椀on and suppression. There are more than 31 million acres in SRA, with an es琀椀mated 1.7 million people and 800,000 exis琀椀ng homes.
How is State Responsibility Area determined?
The Board of Forestry and Fire Protec琀椀on (Board) classifies land as State Responsibility Area. The legal defini琀椀on of SRA is found in the Public Resources Code Sec琀椀on 4125. The Board has developed detailed procedures to classify lands as State Responsibility Area. Lands are removed from SRA when they become incorporated by a city, change in ownership to the federal government, become more densely populated, or are converted to intensive agriculture that minimizes the risk of wildfire. While some lands are removed from SRA automa琀椀cally, the Board typically reviews changes every five years.
What Fire Hazard Severity Zones are in State Responsibility Area? All of the State Responsibility Area is in a Fire Hazard Severity Zone. Lands are either ranked as Moderate, High or Very High Fire Hazard Severity Zones.
What are the wildland urban interface (WUI) building codes in State Responsibility Area? The WUI building codes (California Building Code (CBC) Chapter 7A) reduce the risk of embers fanned by wind-blown wildfires from igni琀椀ng buildings. The codes for roofing, siding, decking, windows, and vents apply throughout all State Responsibility Area regardless of the fire hazard severity ranking. Ember-resistant building materials can be found at:
h琀琀ps://osfm.fire.ca.gov/divisions/fire-engineering-and-inves琀椀ga琀椀ons/building-materials-lis琀椀ng/
State Responsibility Area
FHSZ Frequently Asked Questions
What is the difference between the various Fire Hazard Severity Zones? Classifica琀椀on of a wildland zone as Moderate, High or Very High Fire Hazard is based on the average hazard across the area included in the zone, which have a minimum size of 200 acres. In wildlands, hazard is a func琀椀on of modeled flame length under the worst condi琀椀ons and annual burn probability. Both these factors generally increase with increasing hazard level, but there may be instances where one value is Very High and the other is low, pushing the overall hazard into a more intermediate ranking. On average, both modeled flame length and burn probability increase by roughly 40-60% between hazard classes.
Is the GIS data for Fire Hazard Severity Zones available for download? The data inputs used to develop the Fire Hazard Severity Zones are iden琀椀fied in the Ini琀椀al Statement of Reasons (ISOR) Title 19 Development (ca.gov). CAL FIRE has developed an addi琀椀onal data package which consists of sequen琀椀al modeling steps, including any data inputs that were not already publicly available and referenced in the ISOR. The data package encompasses 34 spa琀椀al datasets and 8 tables, provided in raster, polygon, and table format. These datasets are forma琀琀ed for Esri ArcGIS so昀琀ware, except for four tables provided in Excel. Ten of the datasets are updated versions used to produce an edited SRA FHSZ map following the public comment period that ended April 4, 2023. Upon formal adop琀椀on of the FHSZ map, the final SRA FHSZ geospa琀椀al data file will become available. The data package is available on the FHSZ website Fire Hazard Severity Zones (ca.gov) under the science and methods banner.
State Responsibility Area
FHSZ Frequently Asked Questions
What is Local Responsibility Area or LRA?
Local Responsibility Areas (LRA) are incorporated ci琀椀es, urban regions, agriculture lands, and por琀椀ons of the desert where the local government is responsible for wildfire protec琀椀on. This is typically provided by city fire departments, fire protec琀椀on districts, coun琀椀es, and by CAL FIRE under contract.
When did Fire Hazard Severity Zones begin in Local Responsibility Area? Assembly Bill 337 (Bates, 1992) prompted by the devasta琀椀ng Oakland Hills Fire of 1991, calls for CAL FIRE to evaluate fire hazard severity in Local Responsibility Area and to make a recommenda琀椀on to the local jurisdic琀椀on where Very High FHSZ exist. Government Code 51175 then provides direc琀椀on for the local jurisdic琀椀on to take appropriate ac琀椀on.
How are Fire Hazard Severity Zones determined in Local Responsibility Areas? CAL FIRE uses an extension of the State Responsibility Area Fire Hazard Severity Zone model as the basis for evalua琀椀ng fire hazard in Local Responsibility Area. The Local Responsibility Area hazard ra琀椀ng reflects flame and ember intrusion from adjacent wildlands and from flammable vegeta琀椀on in the urban area.
What are the requirements for landowners in Fire Hazard Severity Zones in Local Responsibility Areas?
California’s WUI building codes (CBC Chapter 7A) apply to the design and construc琀椀on of new buildings located in High and Very High FHSZs in Local Responsibility Areas. Local ordinances may require igni琀椀on resistant construc琀椀on for remodel projects. Check with your local building department to determine which igni琀椀on resistant building codes apply to your project. In addi琀椀on, Government Code Sec琀椀on 51182 calls for defensible space clearance and other wildland fire safety prac琀椀ces for buildings. Owners are also required to make a natural hazard disclosure as part of a real estate transfer. For informa琀椀on regarding home hardening and defensible space clearance, visit www.readyforwildfire.org.
Does the designa琀椀on of Very High Fire Hazard Severity Zones in the Local Responsibility Area trigger the 100-foot clearance requirement?
Yes, per Government Code 51182 unless a local government has passed a more stringent requirement, the 100-foot defensible space clearance applies. For informa琀椀on regarding home hardening and defensible space clearance, visit www.readyforwildfire.org.
Local Responsibility Area
FHSZ Frequently Asked Questions
Why is my property in a different zone than the adjacent area, which looks similar? In non-wildland areas, zone edges occur based on distance to the wildland edge. Because hazard in these areas is largely determined by incoming embers from adjacent wildland, urban areas that are similar in vegeta琀椀on type and housing density may have a change in FHSZ class as the distance to the wildland edge increases. Areas immediately adjacent to wildland receive the same FHSZ score as that wildland where fire originates, and the model then produces lower scores as the distance to wildland edge increases.
What is the process for developing Fire Hazard Severity Zones in the Local Responsibility Area? CAL FIRE uses the same modeling data that is used to map the State Responsibility Area. The map, along with a model ordinance, are then sent to the governing body for adop琀椀on.
How are the new Fire Hazard Severity Zones impac琀椀ng development? Many of the changes expanding Fire Hazard Severity Zones in Local Responsibility Areas have been supported by the building industry. CAL FIRE works closely with the building industry when se琀?ng various building codes and defensible space requirements, so we are working together to not affect development itself but to make sure development matches the hazards of that area.
When will the Local Responsibility Area Map be released? The Local Responsibility Area map process will happen a昀琀er the State Responsibility Area process has been completed, which is es琀椀mated to occur in winter of 2025.
Why haven’t Moderate and High Fire Hazard Severity Zone classes been classified before in the Local Responsibility Area?
New legisla琀椀on, Senate Bill 63 (Stern, 2021), now requires the adop琀椀on of all three Fire Hazard Severity Zone classes in the Local Responsibility Area. Previously only Very High Fire Hazard Severity Zones were required for adop琀椀on in Local Responsibility Areas.
Local Responsibility Area
LRA Legislation Factsheet
Assembly Bill No.337
An act to add Chapter 6.8 (commencing with Section 51175) to Part 1 of Division 1 of Title 5 of the Government Code, and to amend Section 13108.5 of the Health and Safety Code, relating to fire protection.
[Enrolled, January 28, 1991]
AB 337, Bates. Very high fire hazard severity zones.
(1) Under existing law, the State Board of Forestry is required to classify all lands within the state, in accordance with prescribed criteria, for the purpose of determining areas in which the financial responsibility of preventing and suppressing fires is primarily the responsibility of the state.
This bill would declare that the prevention of fires is not a municipal affair but is instead, a matter of statewide concern, and would make a finding and declaration of the Legislature that its provisions apply to all local agencies, including, but not limited to, charter cities, charter counties, and charter cities and counties. The bill would prohibit that finding from limiting the authority of a local agency, as defined, from imposing more restrictive fire and panic safety requirements, as otherwise authorized by law.
The bill would state that it is not the intent of the Legislature to limit or restrict the authority of a local agency to impose more restrictive fire and panic safety requirements, as otherwise authorized by law.
This bill would require the Director of Forestry and Fire Protection to identify areas in the state as very high fire hazard severity zones within all counties pursuant to a prescribed schedule. The bill would require local agencies, as defined, to designate, by ordinance, very high fire hazard severity zones in their jurisdiction after receiving recommendations from the director, except as prescribed. The bill would authorize local agencies to include or exclude areas following certain findings and would require changes made by local agencies to be final and not rebuttable by the director. By requiring local agencies to designate very high fire hazard severity zones within their jurisdictions, this bill would impose a state-mandated local program. The bill would require the State Fire Marshal to prepare and adopt a model ordinance that provides for the establishment of any high fire hazard security zones.
LRA Legislation Factsheet
Assembly Bill No.337 (Continued)
(2) Under existing law, any person who owns, leases, controls, operates, or maintains any building or structure in, upon, or adjoining any mountainous area or forest-covered lands, brush-covered lands, or grass-covered lands, or any land that is covered with flammable material, is required to undertake specified fire protection measures, including the maintenance of specified firebreaks.
The bill would enact requirements of this nature for any person who owns, leases, controls, operates, or maintains, any occupied dwelling or occupied structure in, upon, or adjoining any mountainous area, forest-covered land, brush-covered land, grass-covered land, or land covered with flammable material, which area or land is within a very high fire hazard severity zone, as described in (1).
The bill would authorize local agencies to exempt certain structures and would exempt certain land or water areas.
The bill would make violation of these requirements an infraction or misdemeanor, as specified, thereby imposing a state-mandated local program by creating a new crime, and would specify related matters.
This bill would require local agencies to notify owners of property of violation and would authorize local agencies to correct the conditions and make a lien upon the property, as prescribed. By creating these requirements, this bill would impose a state-mandated local program.
The bill would permit a violation of these requirements to be considered a public nuisance, as specified.
(3) Existing law requires the State Fire Marshal to adopt, amend, and repeal regulations for roof coverings and openings into the attic areas of buildings in those fire hazard severity zones in state responsibility lands as designated by the director. Existing law requires the director to classify lands within state responsibility areas into fire hazard severity zones.
This bill would instead require the State Fire Marshal to propose, and would require the State Building Standards Commission to adopt, amend, and repeal those regulations. The bill would also require the State Fire Marshal to propose, and would require the State Building Standards Commission to adopt, amend, and repeal, those regulations for buildings in very high fire hazard severity zones in state responsibility lands, designated by the director, and in very high fire hazard severity zones as described in (1). The bill would require roofs on all new buildings and certain existing buildings in both of those zones to be at least a class B roof that complies with Standard 32-7 of the Uniform Building Code, as adopted in the California Building Standards Code. The bill would impose requirements on installers and roofing materials and make other related changes. The bill would exempt historic buildings, as defined, from these provisions.