NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -34 LSA searched the California Natural Diversity Database (CNDDB) 19 and the United States Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) website 20 for information on special-status species known to occur or with the potential to occur in the Project vicinity. LSA also relied on available documents related to the Project area, including the draft Solano Multispecies Habitat Conservation Plan (HCP) 21, the draft Environmental Impact Report for the Fairfield Train Station Specific Plan (TSSP) 22, previous reports related to biological resources in the area, and LSA biologists’ knowledge of species in the area.

The CNDDB search resulted in occurrence records for 49 special-status species within 5 miles of the Project site and pipeline alignments. An additional 7 wildlife species were considered based on the USFWS species list obtained for the Project vicinity, and an additional 6 plant species were considered based on their inclusion in the Solano Multispecies HCP. 23 Special-Status Plants. Based on the results of the evaluation, 23 plant species have the potential to occur within or adjacent to the Project site. Species listed under the ESA and/or CESA are Contra Costa goldfields (Lasthenia conjugens; federally endangered), Colusa grass (Neostapfia colusana; federally threatened, State endangered), San Joaquin Valley orcutt grass (Orcuttia inaequalis; federally threatened, State endangered), and Solano grass (Tuctoria mucronata; federally endangered, State endangered).

Additional special-status plants with California Rare Plant Ranks (CRPR) of 1A, 1B, or 2 and the potential to occur within or adjacent to the Project site are Ferris’ milk vetch (Astragalus tener var. ferrisiae; CRPR 1B), alkali milk-vetch (Astragalus tener var. tener; CRPR 1B), heartscale (Atriplex cordulata var. cordulata; CRPR 1B), brittlescale (Atriplex depressa; CRPR 1B), vernal pool smallscale (Atriplex persistens; CRPR 1B), pappose tarplant (Centromadia parryi ssp. parryi; CRPR 1B), recurved larkspur (Delphinium recurvatum; CRPR 1B), dwarf downingia (Downingia pusilla; CRPR 2B), San Joaquin spearscale (Extriplex joaquinana; CRPR 1B), adobe-lily (Fritillaria pluriflora; CRPR 1B), Bogg’s Lake hedge-hyssop (Gratiola heterosepala; CRPR 1B), Carquinez goldenbush (Isocoma arguta; CRPR 1B), Coulter’s goldfields (Lasthenia glabrata ssp. coulteri; CRPR 1B), Legenere (Legenere limosa; CRPR 1B), Marsh microseris (Microseris paludosa; CRPR 1B), Baker’s navarretia (Navarretia leucocephala subsp. bakeri; CRPR 1B), bearded popcornflower (Plagiobothrys hystriculus; CRPR 1B), California alkali grass (Puccinellia simplex; CRPR 1B), and saline clover (Trifolium hydrophilum; CRPR 1B).
19 California Department of Fish and Wildlife (CDFW). 2026. California Natural Diversity Database.

Commercial Version Dated January 6, 2026. Sacramento: California Department of Fish and Wildlife, Wildlife Habitat Data Analysis Branch. 20 United States Fish and Wildlife Service (USFWS). 2026. Information for Planning and Consultation (IPaC) Online Database. Sacramento: Sacramento Fish and Wildlife Office. Website: https://ecos.fws.gov/ipac (accessed January 7, 2026). 21 Solano County Water Agency (SCWA). 2025. Multispecies Habitat Conservation Plan. Prepared for United States Fish and Wildlife Service. Sacramento. 22 AECOM. 2010. Draft Environmental Impact Report for the Fairfield Train Station Specific Plan.

Sacramento: AECOM. December. 23 Solano County Water Agency (SCWA). 2025. Multispecies Habitat Conservation Plan. Prepared for United States Fish and Wildlife Service. Sacramento.

Page 178 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-35 The Biological Resources Report (Appendix B) ranks the potential for occurrence for these species as low, moderate, or high based on the presence of suitable habitat and distance to nearest known occupied habitat. Fifteen species have a low potential for occurrence due to low habitat suitability and/or historical agricultural disturbance of the site, and lack of records on contiguous properties.

Seven species have a moderate potential for occurrence based on presence of suitable habitat and nearby records. One species, Contra Costa goldfields, has a high potential for occurrence based on presence of suitable habitat and numerous records in the Project vicinity.

Special-Status Wildlife. A total of 18 wildlife species also have the potential to or are known to occur within or adjacent to the Project site and pipeline alignments. Species listed under the ESA and/or CESA are vernal pool fairy shrimp (Branchinecta lynchi), vernal pool tadpole shrimp (Lepidurus packardi), California tiger salamander (Ambystoma californiense; federally threatened, State threatened), Swainson’s hawk (State threatened), and tricolored blackbird (Agelaius tricolor; State threatened).

Four species are currently candidates for listing under the ESA or CESA: Crotch’s bumble bee (Bombus crotchii; State candidate), monarch butterfly (Danaus Plexippus; federal proposed), northwestern pond turtle (federal proposed, Species of Special Concern), and burrowing owl (State candidate).

White-tailed kite (Elanus leucurus) is fully protected under State law. The remaining special-status wildlife species with the potential to occur on site are California Species of Special Concern:
grasshopper sparrow (Ammodramus savannarum), loggerhead shrike (Lanius ludovicianus), short-eared owl (Asio flammeus), northern harrier (Circus hudsonius), and American badger (Taxidea taxus).

Bald eagle (Haliaeetus leucocephalus) and golden eagle (Aquila chrysaetos) may occasionally forage in the grasslands within the Project site, but there is no known nesting for these species in the immediate Project area, and they are unlikely to be significantly impacted by Project activities.

Similarly, mountain plover (Anarhynchus montanus) is a wintering species in the Project area and is unlikely to be present during the construction season.

4.4.1.7 Critical Habitat
There are no federally designated Critical Habitat Units on or adjacent to the Project site or pipeline alignments.

4.4.2 Regulatory Requirements

4.4.2.1 Federal Regulations
Federal Endangered Species Act. The federal Endangered Species Act (FESA) and subsequent amendments provide guidance for the conservation of endangered and threatened species and the ecosystems upon which they depend. The FESA defines species as threatened or endangered and provides regulatory protection for listed species. The FESA provides a program for the conservation and recovery of threatened and endangered species as well as the protection of designated critical habitat that United States Fish and Wildlife Service (USFWS) determines is required for the survival

Page 179 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -36 and recovery of listed species. The USFWS and National Marine Fisheries Service share responsibilities for administering the FESA.

Section 404 of the Clean Water Act. The Clean Water Act (CWA) provides the primary means for the protection of “waters of the United States” (WOTUS) including wetlands. Pursuant to Section 404 of the CWA, the USACE regulates discharges of dredged or fill material into waters of the United States.

These waters include wetlands and non-wetland bodies of water that meet specific criteria, including a direct or indirect connection to interstate commerce. The USACE regulatory jurisdiction pursuant to Section 404 of the CWA is founded on a connection, or nexus, between the waterbody in question and interstate commerce. This connection may be direct (through a tributary system linking a stream channel with traditionally navigable waters used in interstate or foreign commerce) or may be indirect (through a nexus identified in the USACE regulations). The USACE typically regulates as non-wetland waters of the United States any body of water displaying an ordinary high-water mark (OHWM). To be considered a jurisdictional wetland under Section 404, an area must possess three wetland characteristics: hydrophytic vegetation, hydric soils, and wetland hydrology.

Each characteristic has a specific set of mandatory wetland criteria that must be satisfied in order for that particular wetland characteristic to be met.

Section 401 of the Clean Water Act. Section 401 Certification requires an applicant for a federal license or permit to conduct any activity that may result in a discharge to waters of the United States to obtain certification from the state that the discharge will comply with other provisions of the act. Section 402 establishes a permitting system for the discharge of any pollutant (except dredged or fill material) into waters of the United States.

Migratory Bird Treaty Act. The Migratory Bird Treaty Act (MBTA) protects all common wild birds found in the United States except the house sparrow, starling, feral pigeon, and resident game birds such as pheasant, grouse, quail, and wild turkey. Resident game birds are managed separately by each state. Under the MBTA, “it shall be unlawful at any time, by any means or in any manner, to pursue, hunt, take, capture, kill, attempt to take, capture, or kill, possess, offer for sale, sell, offer to barter, barter, offer to purchase, purchase, deliver for shipment, ship, export, import, cause to be shipped, exported, or imported, deliver for transportation, transport or cause to be transported, carry or cause to be carried, or receive for shipment, transportation, carriage, or export, any migratory bird, any part, nest, or egg of any such bird, or any product, whether or not manufactured, which consists, or is composed in whole or part, of any such bird or any part, nest, or egg thereof …” (16 U.S.C. Section 703(a)).

4.4.2.2 State Regulations
California Endangered Species Act. The California Department of Fish and Wildlife (CDFW) administers the California Endangered Species Act (CESA). CESA applies to “endangered” or “threatened” birds, mammals, fish, amphibians, reptiles, and plants, but does not apply to insects (see 81 Ops.Cal.Atty.Gen. 222 (1998)). The State of California considers an “endangered” species one whose prospects of survival and reproduction are in serious danger of becoming extinct throughout all, or a significant portion, of its range due to one or more causes, including loss of habitat, change in habitat, overexploitation, predation, competition, or disease. Any species determined by the commission as “endangered” on or before January 1, 1985, is an “endangered

Page 180 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-37 species.” A “threatened” species is one present in such small numbers throughout its range that it is likely to become an endangered species in the foreseeable future in the absence of special protection or management. The California Endangered Species Act of 1970 created the categories of “Endangered” and “Rare.” The California Endangered Species Act of 1984 created the categories of “Endangered” and “Threatened.” On January 1, 1985, all animal species designated as “Rare” were reclassified as “Threatened”.Section 2080 of the Fish and Game Code (FGC) prohibits “take” of any species that the commission determines to be an endangered species or a threatened species. Take is defined in Section 86 of the FGC as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill.” CESA allows for take incidental to otherwise lawful development projects. CESA emphasizes early consultation to avoid potential impacts to rare, endangered, and threatened species and to develop appropriate mitigation planning to offset project-caused losses of listed species populations and their essential habitats. “Candidate species” means a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that the commission has formally noticed as being under review by the department for addition to either the list of endangered species or the list of threatened species, or a species for which the commission has published a notice of proposed regulation to add the species to either list (FGC Section 2068).

The CDFW exercises authority over mitigation projects involving State‐listed species, including those resulting from CEQA mitigation requirements. Lead agencies are directed by the CESA to consult with the CDFW on projects or actions that could affect listed species. A “taking” may be authorized by the CDFW if an approved habitat management plan or management agreement that avoids or compensates for possible jeopardy is implemented. In addition, the CDFW requires preparation of mitigation plans in accordance with published guidelines.

California Fish and Game Code Sections 3511, 4700, 5050, and 5515. The protection of “fully protected species” is described in FGC Sections 3511, 4700, 5050, and 5515. These statutes prohibit take or possession of fully protected species. CDFW is unable to authorize incidental take of fully protected species, except as allowed for in an approved Natural Communities Conservation Plan, or through direct legislative action. In July 2023, Senate Bill 147 was signed into law granting the CDFW the ability to issue a permit under CESA for the take of fully protected species for specific infrastructure projects including those related to the State Water Project, critical regional or local water agency infrastructure, transportation projects that do not increase highway or street capacity, and wind and solar projects within the State that provide electricity to a California-based balancing authority. Take permits may be issued under this law until December 31, 2033.

California Native Plant Protection Act. Under FGC Sections 1900 through 1913, all State agencies must use their authority to carry out programs to conserve endangered and rare native plants.

Provision of the California Native Plant Protection Act prohibits the taking of listed plants from the wild and requires notification of CDFW at least 10 days in advance of any change in land use. This allows CDFW to salvage listed plant species that otherwise would be destroyed. A project proponent is required to conduct botanical inventories and consult with CDFW during project planning to comply with the provisions of this act and sections of CEQA that apply to rare or endangered plants.

Page 181 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -38 State Species of Special Concern. The CDFW designates certain animal species as Species of Special Concern (SSC) based on factors such as declining populations, restricted distribution, or habitat loss.

SSCs are not formally listed under the CESA and do not receive the same statutory protections as listed or fully protected species. Instead, the SSC designation is used by CDFW as a management and planning tool to focus conservation attention and inform land‑use decision‑making. SSC is an administrative designation that carries no formal legal status per se but signifies that the species is recognized as sensitive by the CDFW. Section 15380 of the State CEQA Guidelines clearly indicates that species of special concern should be included in an analysis of project impacts if they can be shown to meet the criteria of sensitivity outlined therein.

California Fish and Game Code Section 3503. Section 3503 of the FGC prohibits the take, possession, or needless destruction of the nest or eggs of any bird, except as otherwise provided by the FGC or regulations adopted pursuant thereto. Section 3503.5 provides additional protections for birds of prey, including hawks and owls, by prohibiting the take, possession, or destruction of birds in the orders Falconiformes and Strigiformes, as well as their nests or eggs. In addition, FGC Sections 3513, 3800 and the federal Migratory Bird Treaty Act protect migratory nongame native bird species. Collectively, these regulations are intended to avoid disturbance to active nests and prevent the loss of reproductive effort resulting from vegetation removal, construction noise, or other project‑related activities.

Fish and Wildlife Protection - California Fish and Game Code, Sections 1600 to 1603. The FCG mandates that “it is unlawful for any person to substantially divert or obstruct the natural flow or substantially change the bed, channel, or bank of any river, stream, or lake designated by the department, or use any material from the streambeds, without first notifying the department of such activity.” CDFW jurisdiction includes ephemeral, intermittent, and perennial watercourses, including dry washes, characterized by the presence of hydrophytic vegetation, the location of definable bed and banks, and the presence of existing fish or wildlife resources. Furthermore, CDFW jurisdiction is often extended to habitats adjacent to watercourses, such as oak woodlands in canyon bottoms or willow woodlands that function as part of the riparian system. Historic court cases have further extended CDFW jurisdiction to include watercourses that seemingly disappear but re‐emerge elsewhere. Under the CDFW definition, a watercourse need not exhibit evidence of an OHWM to be claimed as jurisdiction. However, CDFW does not regulate isolated wetlands; that is, those that are not associated with a river, stream, or lake.

4.4.2.3 Regional/Local Regulations
City of Fairfield General Plan24
• Goal OSCR-3. Support public and private efforts for preserving open spaces and biological environments—particularly unique and fragile biological environments— within the Planning Area.
24 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 182 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-39 ○ Policy OSCR-3.1 Solano Multispecies Habitat Conservation Plan. Establish policies to protect indigenous wildlife and their habitats. Until the Solano Habitat Conservation Plan (HCP) is adopted, comply with all of the Avoidance, Minimization, and Mitigation Measures listed in the Draft Solano Habitat Conservation Plan (HCP). Support the Solano County Water Agency HCP preparation effort and, if the HCP is approved and adopted, implement its requirements.
○ Policy OSCR-3.5 Protection of Biological Resources with New Development. Protect critical habitat areas and special-status species through implementation of the following measures:
■ Continue to consult with, and refer development proposals in sensitive areas (e.g., areas containing habitat or qualities that potentially support special status species) to, State and federal wildlife agencies for review and comment.
■ For any proposed development site containing habitat or qualities that potentially support special status species, require qualified biologists to conduct a reconnaissance survey of the site for special-status species and their habitats, jurisdictional waters of the United States and any other protected biological resources. The data reviewed will include the biological resources setting and special-status species lists in the 2024 EIR and best available, current data for the area, including a current review of the California Natural Diversity Database. This requirement shall apply prior to City consideration of any development proposal for the site. If no sensitive biological resources are found during this survey, no further surveys will be necessary. ■ If sensitive biological resources are found on the proposed development site, the biologist will conduct additional surveys, as needed, using methods and protocols developed or acceptable by the U.S. Fish and Wildlife Service and California Department of Fish and Wildlife and make recommendations for avoiding sensitive biological resources to the extent feasible, or developing site-specific mitigation strategies to avoid impacts. This could include avoidance of the resource, providing setbacks, clustering development onto less sensitive areas, preparing restoration plans, off-site mitigation, and/or other similar measures as determined on a project-specific basis. The surveys will include seasonally appropriate, protocol-level surveys for all sensitive species or natural communities potentially in the area. The biologist will also flag or fence sensitive resources to be avoided. This requirement shall apply prior to City consideration of any development proposal for the site. ■ If other habitat for special status species is found on the proposed development site that could support state or federally threatened or endangered species, or state fully protected species, consult with the California Department of Fish and Wildlife to determine potential for impacts and prepare appropriate state and federal documentation for take authorization and any required mitigation for the loss of habitat through the permit process. This requirement shall apply prior to City consideration of any development proposal for the site. No take authorization is available for fully protected species, and consultation with the California Department of Fish and Wildlife would be required to develop approved avoidance measures.

Page 183 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -40 ○ Policy OSCR-3.6 Nesting Birds. Protect the nests of raptors and other birds when in active use, as required by State and federal regulations. In new development, avoid disturbance to and loss of bird nests in active use by scheduling vegetation removal and new construction during the non-nesting season or by conducting a preconstruction survey by a qualified biologist to confirm nests are absent or to define appropriate buffers until any young have successfully fledged the nest.
• Goal OSCR-4. Continue to collaborate with Solano County, neighboring jurisdictions, and regional agencies to support the management of natural resources, including riparian corridors, wetlands, and open space areas.
○ Policy OSCR-4.1 Restoration and Management. Promote restoration and establish permanent mechanisms to protect wetlands and riparian corridors and avoid or reduce the loss of riparian habitat to the extent feasible. Require assessment of habitat by qualified professionals for development projects along freshwater marsh, riparian, or open water habitat areas not already covered by the Creekside Protection Ordinance. ○ Policy OSCR-4.3 Vernal Pools. Identify and protect vernal pools located in the entire Planning Area.
○ Policy OSCR-4.4 Waterway Maintenance and Restoration. Maintain existing waterways in their natural state and restore degraded or damaged waterways to a natural state if possible.
○ Policy OSCR-4.5 Fairfield Watersheds. Protect Fairfield watersheds by minimizing point and nonpoint source pollutants.
○ Policy OSCR-4.6 Creekside Protection Plan. Continue to implement the City’s Creekside Protection Plan (Municipal Code Chapter 25, Article VIII) to preserve the riparian zone of creeks in the city.
○ Policy OSCR-4.7 Erosion Control. Manage erosion in the Planning Area, particularly in watershed areas, through on-site erosion control.
○ Policy OSCR-4.8 Minimize Site Disturbance. In design and construction, require use of best practices to preserve natural resources such as soil, trees, native plants, and permeable surfaces.
○ Policy OSCR-4.9 Prevent Contaminated Runoff. Ensure that new parking lots and commercial development incorporate best management practices, including low-impact development methods, designed to prevent or minimize runoff of oil, grease, solvents battery acid, coolant, gasoline, sediments, trash, and other pollutants from the site.

Page 184 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-41 City of Vacaville General Plan25
• Goal COS-1 Protect and enhance habitat for sensitive species and natural communities. ○ Policy COS-P1.2 Manage natural open space lands, where feasible, in a manner consistent with wildlife protection.
○ Policy COS-P1.3 Protect the existing wildlife movement corridors within the designated Vacaville-Fairfield Greenbelt area and create new wildlife corridors, including creek corridors and utility easements, where feasible, to enable free movement of animals, to minimize wildlife-urban conflicts, and to establish open space linkages. ○ Policy COS-P1.4 Continue to protect mature trees and existing native non-agricultural trees. ○ Policy COS-P1.5 Require new development proposals to provide baseline assessments prepared by qualified biologists. The assessment shall contain sufficient detail to characterize the resources on, and adjacent to, the development site. The assessment shall also identify the presence of important and sensitive resources, such as wetlands, riparian habitats, and rare, threatened, or endangered species affected by the development. ○ Policy COS-P1.6 Requires that new development minimize the disturbance of natural habitats and vegetation. Require revegetation of disturbed natural habitat areas with native or non-invasive naturalized species.
○ Policy COS-P1.9 Requires that new development include provisions to protect and preserve wetland habitats that meet one of the following conditions:
■ The wetlands contribute to the habitat quality and value of reserve/preserve lands established or expected to be established in perpetuity for conservation purposes. ■ The wetlands are contiguous to riparian or stream corridors, or other permanently protected lands.
■ The wetlands are located within or contiguous to other high value natural areas. ○ Policy COS-P1.10 Where avoidance of wetlands is not practicable or does not contribute to long-term conservation of the resources, require new development to provide for off-site mitigation that results in no net loss of wetland acreage and functional value within the watersheds draining to the Delta or Suisun Marsh.
○ Policy COS-P1.12 Until the Solano Habitat Conservation Plan (HCP) is adopted, comply with all of the Avoidance, Minimization, and Mitigation Measures listed in the Draft Solano HCP (see Appendix A for a list of the Avoidance and Minimization Measures that are applicable to Vacaville). In addition, require that development projects provide copies of required 25 City of Vacaville. 2015. Vacaville General Plan. Website: https://www.cityofvacaville.gov/home/ showpublisheddocument/14102/637045896849400000 (accessed June 2026).

Page 185 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -42 permits, or verifiable statements that permits are not required, from the California Department of Fish and Wildlife (2081 Individual Take Permit) and US Fish and Wildlife Service (Section 7 Take Authorization) prior to receiving grading permits or other approvals that would permit land disturbing activities and conversion of habitats or impacts to protected species. In cases where environmental review indicates that such permits may not be required, the Community Development Director may establish time limits of not less than 45 days from the submission of an adequate request for concurrence response from an agency. If the agency has not responded, or requested a time extension of no more than 90 days to complete their assessment, within the established time frame, applicable grading permits or other authorizations may be provided, subject to other City requirements and review. However, the City’s issuance of grading permits or other authorizations does not absolve the applicant’s obligations to comply with all other State and federal laws and regulations.
• Goal COS-2 Preserve and restore Vacaville’s creeks.
○ Policy COS-P2.2 Protect existing stream channels and riparian vegetation by requiring buffering or landscaped setbacks and storm runoff interception. ○ Policy COS-P2.3 Require creekway and riparian area protection during construction, such as providing adequate setbacks from the creek bank and riparian areas, and creekway and riparian area restoration after construction.

4.4.3 Impact Analysis
The upgrades to the existing North Bay Regional Water Treatment Plant (NBRWTP) along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment, which are further described in Chapter 2.0, Project Description. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Trail Alignment and the Peabody Road Alignment, as appropriate.
a. Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
Less Than Significant with Mitigation Incorporated. As further detailed in the Biological Resources Report (Appendix B) completed for the Project, the Linear Trail Alignment has the potential to significantly impact up to 23 special-status plant species and 18 special-status wildlife species, whereas the Peabody Road Alignment has the potential to significantly impact four special-status plant species and 16 special-status wildlife species. Potential biological resource impacts associated

Page 186 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 202 6

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-43 with implementation of the Peabody Road Pipeline Alignment would be less than those associated with the Linear Trail Pipeline Alignment because the Peabody Road Alignment primarily follows an existing roadway corridor characterized by previously disturbed habitats, maintained roadside vegetation, and developed land uses. In contrast, the Linear Trail Pipeline Alignment traverses a greater extent of seasonal wetlands, open space, and higher-quality upland and riparian habitats that provide suitable habitat for a larger number of special-status plant and wildlife species. No special-status plant or wildlife species were observed during reconnaissance field surveys conducted within the NBRWTP and along the original Linear Trail Pipeline Alignment on December 12, 16, and 17, 2025. Following identification of the additional Peabody Road Pipeline Alignment, a supplemental reconnaissance survey of that alignment was conducted on May 13, 2026. No special-status plant or wildlife species were observed during any of the field surveys, as documented in the Biological Resources Report (Appendix B). Table 4.4.A below provides a summary of State and federally listed and species that have the potential to occur within the Project vicinity, habitat associations for these species, potential effect determinations for these species, and the rational for the determinations by Project alternative alignment. No designated critical habitat is present in the Project area.

Preliminary estimates indicate that total Project ground disturbance, which would include NBRWTP impacts, would encompass up to approximately 56.82 acres under the Linear Trail Alignment and

57.48 acres under Peabody Road Alignment. Of the acreage affected under Linear Trail Alignment, approximately 19.77 acres are within previously developed areas, resulting in approximately 37.05 acres of impacts to undeveloped lands that may provide wildlife habitat, including but not limited to grassland and seasonal wetland habitats. Under Peabody Road Alignment, approximately 23.95 acres of the impacted area are within previously developed lands, reducing impacts to undeveloped lands and potential wildlife habitat to approximately 33.53 acres. Although the Peabody Alignment would result in a slightly larger overall disturbance footprint, a greater proportion of impacts would occur within already developed areas, thereby reducing impacts to natural habitats relative to the Linear Trail Alignment.

Table 4.4.B provides a summary of potential impacts to land cover types by alternative alignment based on preliminary Project layouts. The two pipeline alignments have marginal differences in total acreage of impacts; however, composition of impacts varies between alignments, with the Linear Trail alignment resulting in greater impacts to natural areas. See also Figure 4.4-1: Land Cover Impacts.

Page 187 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -44 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Plants
Ferris’s milk vetch
Astragalus tener var.
ferrisiae
--/--/1B Vernally mesic meadows and mildly alkaline flats in valley and foothill grassland, usually on dry, heavy
clay or adobe soil. Blooms April through May.

Low potential. The seasonal wetlands on and
adjacent to the project site may provide potential
habitat for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. The only record for this species in
Solano County is a 1962 record located southeast of
Dixon. There are no CNDDB occurrences within 5
miles of the project site.

Alkali milk-vetch
Astragalus tener. var.
tener
--/--/1B Grows in alkaline/saline soils in vernally wet playas, flats, and valley and foothill grassland. It flowers
(February) March through June.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road.

Heartscale
Atriplex cordulata var.
cordulata
--/--/1B Grows in sandy, saline or alkaline flats or scalds, in chenopod scrub, meadows, and valley and foothill
grassland. Blooms April through October, depending
on local environmental conditions.

Low potential. Grassland habitat at the project site
may provide habitat for this species. However, past
agricultural disturbance has lowered overall habitat
quality, and this species has not been identified
during floristic surveys on adjoining lands east of the site and Vanden Road. The nearest CNDDB
occurrence overlaps the project site but dates back
to 1892.

Page 188 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-45 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Brittlescale
Atriplex depressa
--/--/1B Grows in relatively barren areas with alkaline clay soils within chenopod scrub, meadows, playas, vernal
pools, and valley and foothill grassland. Occasionally it is found in riparian marshes. Blooms from May
through October, depending on local environmental
conditions.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. Brittlescale has not been identified
during floristic surveys on adjoining lands east of the site and Vanden Road, but there is a CNDDB
occurrence 1.15 miles southwest of the project site.

Vernal pool smallscale
Atriplex persistens
--/--/1B Grows in alkaline grasslands as well as in large and small claypan and alkaline vernal pools. It blooms July through October.

Low potential. The grasslands and seasonal wetlands
near the north end of the project site may provide
habitat for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. There are no CNDDB occurrences
within 5 miles of the project site.

Pappose tarplant
Centromadia parryi ssp.
parryi
--/--/1B Occurs most frequently in mesic areas in coastal prairie, meadow, and grassland habitats, often on
alkaline substrates. Some disturbance appears to be
necessary for its persistence.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site and grasslands may
provide habitat for this species. Pappose tarplant has
not been identified during floristic surveys on
adjoining lands east of the site and Vanden Road,
but there is a CNDDB record 1.47 miles southwest of
the project site.

Soft salty bird’s-beak
Chloropyron molle ssp.
molle
FE/SR/1B Associated with salt and brackish marshes. No potential. There is no suitable habitat for this species on the project site. The nearest CNDDB
record is from Suisun Marsh, 4.42 miles from the
project site.

Suisun thistle
Cirsium hydrophilum
var. hydrophilum
FE/--/1B Upper reaches of tidal marshes near small
watercourses such as sloughs or ditches.

No potential. There is no suitable habitat for this
species on or adjacent to the project site. There are
no CNDDB occurrences within 5 miles of the project
site.

Page 189 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -46 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Recurved larkspur
Delphinium recurvatum
--/--/1B Grows in alkaline areas, in chenopod scrub,
cismontane woodland, and valley and foothill
grassland. It often grows in vernally moist or
inundated areas. It blooms March through May.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. The nearest CNDDB occurrence is 2.45
miles from the project site.

Dwarf downingia
Downingia pusilla
--/--/2B Grows in vernal pools, playa pools, and on margins of vernal lakes other mesic areas within valley and
foothill grassland, both in alkaline (saline) and non-alkaline soils. It flowers March through May depending on environmental conditions.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species, and dwarf downingia has been
identified in vernal pools and associated mesic
grasslands during floristic surveys on adjoining lands
east of the site and Vanden Road.

Mt. Diablo buckwheat
Eriogonum truncatum
--/--/1B Chaparral, coastal scrub, valley and foothill grassland.

Species only known to live on Mount Diablo in Contra
Costa County.

No potential. Outside of known range. The only
known extant occurrences are on Mt Diablo. The
nearest CNDDB occurrence is from 1888 in the
vicinity of Suisun City.

San Joaquin spearscale
Extriplex joaquinana
--/--/1B Grows in seasonal alkali wetlands and alkali sinks in chenopod scrub, meadows, playas, and valley and
foothill grassland. Blooms April through October,
depending on environmental conditions.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. The nearest CNDDB occurrence
overlaps the project site but dates back to 1892.

Page 190 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-47 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Adobe-lily
Fritillaria pluriflora
--/--/1B Occurs often on adobe soil within chaparral,
cismontane woodland, and valley and foothill
grassland. Blooms February to April.

Low potential. There is suitable grassland habitat for
this species on the project site. However, past
agricultural disturbance has lowered overall habitat
quality, and this species has not been identified
during floristic surveys on adjoining lands east of the site and Vanden Road. The nearest CNDDB
occurrence is a 1913 record located 2.56 miles from
the project site.

Bogg’s Lake hedge-hyssop
Gratiola heterosepala
--/SE/1B Grows on clay substrates in vernal pools, small playa-type pools, marshy areas, on the margins of reservoirs and lakes, and in man-made habitats such as borrow
pits and cattle ponds. Blooms April through August
depending environmental conditions.

Low potential. Seasonal wetlands and the pond
adjacent to and within the project site provide
habitat for this species. However, all known
populations in Solano County occur in the vicinity of
Jepson Prairie Preserve, and this species has not
been identified during floristic surveys on adjoining
lands east of the site and Vanden Road. There are no
CNDDB occurrences within 5 miles of the project
site.

Brewer’s western flax
Hesperolinon breweri
--/--/1B Occurs usually on serpentine soil within chaparral, cismontane woodland, and valley and foothill
grassland. Blooms May to July.

No potential. The project site does not have
serpentine soils favored by this species. The nearest
CNDDB occurrence is an 1892 record located 4.64
miles from the project site.

Carquinez goldenbush
Isocoma arguta
--/--/1B Grows in alkaline soils, on flats and low hills in valley and foothill grassland. It often occurs on low benches
near drainages and on mounds in swale areas. It
blooms August through December.

Moderate potential. There is suitable grassland
habitat for this species on the project site. Carquinez goldenbush has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road, but there is a CNDDB occurrence 1.64
miles southwest of the project site.

Page 191 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -48 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Contra Costa goldfields
Lasthenia conjugens
FE/--/1B Grow in vernal pools, swales, and other depressions in open grassland and woodland communities, often
in alkaline soils. It blooms from March through June,
depending on environmental conditions.

High potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species, and Contra Costa goldfields has been
identified in vernal pools and associated mesic
grasslands during floristic surveys on adjoining lands
east of the site and Vanden Road.

Coulter’s goldfields
Lasthenia glabrata ssp.
coulteri
--/--/1B Coastal salt marsh, playas, and vernal pools. Usually found on alkaline soils in playas, sinks, and grasslands.

Blooms February to June.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. The nearest CNDDB record is 2.76
miles from the project site.

Legenere
Legenere limosa
--/--/1B Legenere grows in the bottoms of vernal pools and other wet depressions in grassland communities. It
blooms April through June depending on
environmental conditions.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species, and legenere has been identified in
vernal pools and associated mesic grasslands during
floristic surveys on adjoining lands east of the site
and Vanden Road.

Mason’s lilaeopsis
Lilaeopsis masonii
--/SR/1B Mud banks and flats along erosional creek banks, sloughs, and rivers with tidal influence; brackish and
freshwater marshes and swamps and riparian scrub.

Blooms April through November.

No potential. There is no suitable habitat for this
species on or adjacent to the project site. The
nearest CNDDB occurrence is in Suisun Marsh 4.43
miles from the project site.

Marsh microseris
Microseris paludosa
--/--/1B Cismontane woodland, closed-cone coniferous forest, coastal scrub, and valley and foothill grassland.

Blooms April to June.

Low potential. Grasslands provide suitable habitat
for this species on the project site. However, past
agricultural disturbance has lowered overall habitat
quality, and this species has not been identified
during floristic surveys on adjoining lands east of the site and Vanden Road. The nearest CNDDB record is

4.02 miles from the project site.

Page 192 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-49 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Baker’s navarretia
Navarretia leucocephala
subsp. bakeri
--/--/1B Grows in vernal pools and other wet depressions in cismontane woodland, lower montane coniferous
forest, meadows, and valley and foothill grassland, in
adobe or alkaline soils. It blooms May through July.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, past agricultural
disturbance has lowered overall habitat quality, and
this species has not been identified during floristic
surveys on adjoining lands east of the site and
Vanden Road. The nearest CNDDB occurrence
overlaps the project site but dates back to 1930.

Colusa grass
Neostapfia colusana
FT/SE/1B Grows in large or deep vernal pools, in lakes and shallow playas, in saline/alkaline adobe clay soils. It blooms May through August, depending on
environmental conditions.

Low potential. The pond at the northern end of the
project site may provide potential habitat for this
species. However, occurrence is unlikely as this
species in Solano County is typically associated with
playa type pools on Pescadero soils which are not
present at the project site. There are no CNDDB
occurrences within 5 miles of the project site.

San Joaquin Valley
orcutt grass
Orcuttia inaequalis
FT/SE/1B Grows in vernal pools or larger playa pools in clayey or sandy, generally alkaline soils. It blooms May
through August, depending on environmental
conditions.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. However, there are only two known
locations of this species in Solano County. Both are
located on the Jepson Prairie, with the closest record

4.60 miles from the project site.

Bearded popcornflower
Plagiobothrys
hystriculus
--/--/1B Habitat is not well understood. Probably grows in vernal pools or wet sites in grasslands. Flowers in
April and May.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species. Bearded popcornflower has not
been identified during floristic surveys on adjoining
lands east of the site and Vanden Road, but there is
a CNDDB occurrence 1.58 miles east of the project
site.

Page 193 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -50 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
California alkali grass
Puccinellia simplex
--/--/1B Chenopod scrub, meadows and seeps, valley and
foothill grassland. Typically found on alkaline soils in flats, lake margins, and vernally mesic sites. Blooms
March through May.

Low potential. Seasonal wetland habitat at the
northern end of the project site may provide
marginal habitat for this species. However, past
agricultural disturbance has lowered overall habitat
quality, and this species has not been identified
during floristic surveys on adjoining lands east of the site and Vanden Road. The nearest CNDDB record is

4.86 miles from the project site.

Long-styled sand-spurrey
Spergularia macrotheca
var. longistyla
--/--/1B Alkaline marshes, mud flats, meadows, and hot
springs. Blooms February to May.

No potential. There is no suitable habitat for this
species on the project site. The nearest CNDDB
occurrence is 4.98 miles from the project site.

Suisun marsh aster
Symphyotrichum lentum
--/--/1B Brackish and freshwater marshes and swamps.

Blooms May through November.

No potential. There is no suitable habitat for this
species on the project site. The nearest CNDDB
occurrence is 0.69 mile from the project site.

Two-fork clover
Trifolium amoenum
FE/--/1B Habitat reported as open, sunny sites, sometimes on serpentine soil in coastal bluff scrub and valley and
foothill grassland. Blooms April to June.

No potential. Presumed extinct in the Central Valley
and Solano County. Only one known wild population
in coastal Marin County. All CNDDB records in the
project vicinity are from prior to 1910.

Saline clover
Trifolium hydrophilum
--/--/1B Grows in salt marshes and in alkaline soils in moist valley and foothill grasslands and vernal pools. It
flowers April through June depending on
environmental conditions.

Moderate potential. Seasonal wetland habitat at the
northern end of the project site may provide habitat
for this species, and saline clover is known to occur
within a mitigation bank east of Vanden Road, near
the project site.

Page 194 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-51 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Solano grass
Tuctoria mucronata
FE/SE/1B Found in drying, alkaline/saline clay bottoms of vernal pools, lakes, and shallow playa pools. Blooms April
through July.

Low potential. The seasonal wetland and pond near
the north end of the project site could provide
habitat with suitable, long-term inundation to
support this species. However, this species in Solano
County is typically associated with playa type pools
on Pescadero soils which are not present in the
project area. There are two known, extant
occurrences in Solano County and neither
occurrence is within 5 miles of the project site.

Crustaceans
Conservancy fairy
shrimp
Branchinecta
conservatio
FE/--/-- Occurs in ephemeral or temporary pools of somewhat turbid fresh water (vernal pools) that form in the cool, wet months of the year. Typically occurs in large,
playa pools on Pescadero clay soils.

No potential. The seasonal wetlands and pond along
the pipeline alignment lack microhabitat soil types
associated occupied habitat for this species. The
nearest CNDDB occurrence is from private property
east of Travis Air Force Base, 4.05 miles from the
project site.

Vernal pool fairy shrimp
Branchinecta lynchi
FT/--/-- Inhabit pools with clear to tea-colored water, most commonly in grass or mud bottomed swales, or basalt
flow depression pools in unplowed grasslands, but
sometimes in sandstone rock outcrops and alkaline
vernal pools.

Moderate potential. The seasonal wetlands and
pond along the pipeline alignment provide potential
habitat for this species. The nearest CNDDB
occurrence is 0.59 mile from the project site.

Vernal pool tadpole
shrimp
Lepidurus packardi
FE/--/-- Inhabits seasonal, vernal pools or swales that form in slight depressions after being inundated following fall and winter rains. The pools contain clear to highly
turbid water and have an impervious hardpan,
claypan, or basalt layer beneath the soil surface that
retains the water for a few months at a time.

Moderate potential. The seasonal wetlands and
pond along the pipeline alignment provide potential
habitat for this species. The nearest CNDDB
occurrence is 1.82 miles from the project site.

Page 195 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -52 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Insects
Crotch’s bumble bee
Bombus crotchii
--/SC/-- Grassland and scrub habitat. Typically active from March to August. Food plant genera include
Antirrhinum, Phacelia, Clarkia, Eschscholzia, and
Eriogonum.

High potential. Habitat is present on and adjacent to
the project site. Nearest CNDDB record is 1.72 miles
from the project site.

Western bumble bee
Bombus occidentalis
--/SC/-- Open grassy areas, urban parks and gardens,
chaparral and shrub areas, and mountain meadows.

Generalist forager of wild flowering plants in a range
of habitats.

No potential. The project site may provide habitat
for various native and non-native flowering plants
that would provide nectar sources for adults.

However, within California, this species is currently
only known to occur in high-elevation sites in the
Sierra Nevada and in a couple of locations on the
northern California coast. The nearest CNDDB
occurrence is a 1950 record from the general vicinity
of the City of Vacaville.

Monarch butterfly
Danaus plexippus
FPT/--/-- This butterfly occurs widely in the United States, southern Canada, and Mexico, eastern populations
winter primarily in Mexico but most of the western
population winters at selected sites along the
California coast in native pines but also in non-native trees such as eucalyptus. Milkweeds (Asclepias sp.)
are the larval host plant and the adults feed on the
nectar of variety of native and non-native flowers.

High potential. There is no overwintering habitat for
this species on or adjacent to the project site.

Various native and non-native flowering plants are
likely present that could be used as nectar sources
for migrating adults. There are no CNDDB
occurrences of winter roosts within 5 miles of the
project site, but there are records of both narrow-leaved milkweed (a larval host plant) and monarch butterflies in the project vicinity based on
observations on adjoining properties and the
Western Monarch Milkweed Mapper website
(WMMM 2018).

Valley elderberry
longhorn beetle
Desmocerus californicus
dimorphus
FT/--/-- Larvae are parasites on blue elderberry shrubs (Sambucus nigra) where they bore into the trucks and
stems.

No potential. There are no elderberry shrubs
suitable for this species within or adjacent to the
project site. The nearest CNDDB record is from a
riparian area 3.92 miles from the project site.

Page 196 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-53 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Delta green ground
beetle
Elaphrus viridis
FT/--/-- Current known range is restricted to the Jepson Prairie Region of Solano County. Appears to prefer
mesic grassland habitat that is interspersed with playa pools associated with Pescadero soils that typically
hold water for long time periods (Arnold and
Kavanaugh 2007).

No potential. Project site lacks the suitable playa
pools and associated grasslands on Pescadero soils
favored by this species. Project site is also outside of the species’ known range within the Jepson Prairie
Preserve and adjacent private properties (SCWA
2012; Arnold and Kavanaugh 2007). All CNDDB
occurrences in the vicinity are from areas east of
Travis Air Force Base, 4.18 to 4.77 miles from the
project site.

Amphibians
California tiger
salamander – Central
California DPS
Ambystoma
californiense
FT/ST/-- Grasslands and prairie habitats that include vernal pools or similar seasonal wetlands that typically pond
water for three to four months.

High potential. The seasonal wetland and pond near
the northern end of the project site provide
potential breeding habitat for this species and the
surrounding grasslands provide suitable upland
habitat. The nearest CNDDB occurrence is
immediately adjacent to the project site where
salamanders were relocated from an unrelated
residential development site. There are an additional
26 CNDDB occurrences within 5 miles of the project
site.

Foothill yellow-legged
frog – North Coast DPS
Rana boylii
--/--/SSC Streams with rocky or cobbly substrate that flow at least to May.

No potential. There is no suitable habitat for this
species on or adjacent to the project site. Nearby
CNDDB occurrences date back to 1912 from the
Vacaville area. The species is considered extirpated
from these locations.

Page 197 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -54 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
California red-legged
frog
Rana draytonii
FT/--/SSC Freshwater marshes, streams, ponds, and other semi-permanent water sources. Suitable breeding ponds and pools usually have a minimum depth of 20 inches
and must contain water during the entire
development period for eggs and tadpoles (typically
March through August).

No potential. There is no suitable habitat for this
species on or adjacent to the project site. Known
occurrences in Solano County are in the hills in the
western portion of the County and in the tri-city
open space area bordered by Vallejo, Cordelia, and
Benicia (SCWA 2012). There are no CNDDB records
within 5 miles of the project site.

Western spadefoot
Spea hammondii
FPT/--/SSC Open areas with sandy or gravelly soil within oak or mixed woodlands, grasslands, coastal sage scrub, and
chaparral. Breeds in vernal pools, stock ponds,
roadside ditches, and pools in ephemeral streams.

Ranges from Redding south through the Central
Valley and foothills, in the Central Coast ranges south of San Francisco Bay, and along the southern
California coast.

No potential. Solano County and the project site are
outside of this species’ range. There are no CNDDB
records within 5 miles of the project site.

Reptiles
Northwestern pond
turtle
Actinemys marmorata
FPT/--/SSC Permanent or nearly permanent waterbodies in a variety of habitat types. They can be found in ponds,
marshes, rivers, streams, and irrigation ditches within grasslands, woodlands, and open forests.

High potential. Union Creek and the pond near the
northern end of the project site provide suitable
habitat for this species. The nearest CNDDB
occurrence is 1.12 miles from the project site.

Birds
Tricolored blackbird
Agelaius tricolor
--/ST/SSC Open country. Forages in grassland and cropland habitats. Nests in large groups near fresh water,
preferably in emergent wetlands with tall, dense
cattails or tules, but also in thickets of willow,
blackberry, wild rose, or tall herbs. Seeks cover for
roosting in emergent wetland vegetation, especially
cattails and tules, and also in trees and shrubs.

High potential. The nearest CNDDB occurrence is
from the project site where the species was
observed nesting in a patch of thistle at the water
treatment plant; the site no longer appears to be an
active breeding site. The remaining non-developed
areas of the project site and adjacent properties
provide suitable foraging habitat.

Page 198 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-55 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Grasshopper sparrow
Ammodramus
savannarum
--/--/SSC An uncommon summer resident and breeder in
foothills and lowlands west of the Cascade-Sierra
Nevada crest from Mendocino and Trinity Counties
south to San Diego County. Found in dry, dense
grassland, especially those with a variety of grasses
and tall forbs and scattered shrubs for singing
perches. Nests in slight depressions on the ground at
the base of an overhanging clump of grasses or forbs.

Low potential. The project site provides suitable
habitat for this species, but it has not been observed
in the immediate vicinity of the project site. The
nearest CNDDB occurrence is 4.41 miles from the
project site.

Golden eagle
Aquila chrysaetos
--/--/FP Prefers open terrain for hunting, such as grasslands, deserts, savannahs, and early successional stages of
forest and shrub habitats. Nests in rugged, open
habitats with canyons and escarpments, typically on
cliffs and rock outcroppings; however, they will also
nest in large trees including oaks, sycamores,
redwoods, pines, and eucalyptus.

Low potential. There is no nesting habitat on or
adjacent to the project site. The site provides
potential foraging habitat. There are no CNDDB
records within 5 miles of the project site.

Short-eared owl
Asio flammeus
--/--/SSC Annual and perennial grasslands, prairies, meadows, dunes, irrigated lands, and saline and freshwater
emergent marshes. Requires dense vegetation for
resting and roosting cover, such as tall grasses, brush, ditches, and wetland vegetation.

Low potential. The site provides potential habitat for
this species on the project site. There are no CNDDB
records within 5 miles of the project site.

Burrowing owl
Athene cunicularia
--/SC/SSC Grasslands, deserts, and scrublands characterized by low-growing vegetation and suitable burrows for
nesting. Also known to use human structures such as
rock riprap and debris piles.

High potential. The project site provides suitable
nesting and foraging habitat for this species. The
nearest CNDDB occurrence is within the project site
where a breeding pair was observed along the South
Putah Canal in the early 1990s. There are an
additional 36 CNDDB occurrences within 5 miles of
the project site.

Page 199 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -56 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Swainson’s hawk
Buteo swainsoni
--/ST/-- Nests in riparian forest and scattered trees of open grasslands and agricultural fields; forages in
grasslands and agricultural fields.

High potential. The project site contains suitable
nesting habitat in riparian trees along Union Creek at
the north end of the site, but the surrounding
development and a high level of disturbance from
nearby roads makes nesting unlikely. Grasslands
along the pipeline alignment provide suitable
foraging habitat. The nearest CNDDB occurrence is
for a nesting pair 0.55 mile from the project site.

There are an additional 26 CNDDB occurrences
within 5 miles of the project site.

Mountain plover
Charadrius montanus
--/--/SSC Winter migrant. Short grass plains, plowed fields, arid plains, alkali sink scrub, valley sink scrub, alkali playa, burned and annual grasslands, and open sagebrush
areas that are barren or have very sparse vegetation
(less than 10% cover).

Low potential. The project site provides suitable
wintering (foraging) habitat for this species. There
are no CNDDB records within 5 miles of the project
site.

Northern harrier
Circus hudsonius
--/--/SSC Habitat types include brackish and freshwater marshes, alpine meadows, grasslands, prairies, and
agricultural lands. Wintering habitat includes fresh
and saltwater wetlands, coastal dunes, grasslands,
deserts, meadows, and crop lands. Breeding habitat
includes fresh water wetlands, coastal brackish
wetlands, open wet meadows and grasslands, shrub-steppe, desert sinks, areas along rivers and lakes, and crop fields.

Moderate potential. The project site provides
suitable habitat for this species. The nearest CNDDB
record is a breeding record 2.06 miles from the
project site at a location that has since been
developed.

White-tailed kite
Elanus leucurus
--/--/FP Nests in trees and shrubs within or adjacent to grasslands and savannahs; forages in grasslands and
agricultural fields.

Moderate potential. Riparian trees along Union
Creek at the north end of the project site provide
suitable nesting habitat for this species and
grasslands along the pipeline alignment provide
suitable foraging habitat. The nearest CNDDB
occurrence is a breeding record 1.99 miles from the
project site.

Page 200 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-57 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Saltmarsh common
yellowthroat
Geothlypis trichas
sinuosa
--/--/SSC Brackish marsh, riparian woodland/swamp,
freshwater marsh, salt marsh, and upland. Range
includes coastal areas and marshes surrounding San
Pablo and San Francisco bays.

No potential. There is no habitat for this species on
or adjacent to the project site. The nearest CNDDB
occurrence is from Suisun Marsh 4.93 miles from the
project site.

Bald eagle
Haliaeetus
leucocephalus
Delisted/SE/F
P
Low-disturbance areas, forest structure near
estuaries, large lakes, reservoirs, and rivers.

Low potential. There is no nesting or foraging
habitat for this species on or adjacent to the project
site, but they are occasionally seen in the area. The
nearest CNDDB occurrence is 1.89 miles from the
project site.

Loggerhead shrike
Lanius ludovicianus
--/--/SSC Nests in small trees and shrubs within and adjacent to open habitats; forages in grasslands and fields.

High potential. The project site provides suitable
nesting and foraging habitat for this species. There
are no CNDDB records within 5 miles of the project
site, but this species has been observed nesting on
nearby properties.

California black rail
Laterallus jamaicensis
coturniculus
--/ST/FP Freshwater marshes, wet meadows, and shallow
margins of saltwater marshes bordering larger bays.

Frequents marshes dominated by pickleweed
(Salicornia sp.).

No potential. There is no habitat for this species on
or adjacent to the project site. The nearest CNDDB
record is from Suisun Marsh 4.60 miles from the
project site.

Suisun song sparrow
Melospiza melodia
maxillaris
--/--/SSC Brackish marshes surrounding Suisun Bay. Dense vegetation is required for nesting sites, song perches, and cover from predators.

No potential. There is no habitat for this species on
or adjacent to the project site. The nearest CNDDB
occurrence is from Suisun Marsh 4.86 miles from the
project site.

California Ridgway’s rail
Rallus obsoletus
obsoletus
FE/SE/FP Saltwater and brackish marshes often crossed by tidal sloughs in San Francisco Bay. Associated with
substantial cover of cordgrass (Spartina sp.),
pickleweed (Salicornia sp.), and/or gumplant
(Grindelia sp.) cover.

No potential. There is no habitat for this species on
or adjacent to the project site. The nearest CNDDB
record is from Suisun Marsh 4.56 miles from the
project site.

Page 201 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -58 Table 4.4.A: Special-Status Species Evaluated for the Project Common Name
(Scientific Name)
Status*
(Federal/State/
Other)
Habitat Potential to Occur/Rationale**
Mammals
Townsend’s big-eared
bat
Corynorhinus
townsendii
--/--/SSC Typically roosts in open areas of abandoned buildings, caves, and mines. Forages along wooded habitat
edges, often gleaning insects from trees or shrubs.

No potential. The project site provides potential
foraging habitat for this species, but there is no
known roosting habitat on or adjacent to the project
site. The nearest CNDDB occurrence is 3.39 miles
from the project site.

Salt-marsh harvest
mouse
Reithrodontomys
raviventris
FE/SE/FP Saline emergent wetlands with pickleweed and
adjacent uplands for flood escape.

No potential. There is no habitat for this species on
or adjacent to the project site. The nearest CNDDB
occurrence is from Suisun Marsh 4.27 miles from the
project site.

American badger
Taxidea taxus
--/--/SSC Occurs in a diversity of habitats. The primary requirements seem to be sufficient food, friable soils, and relatively open, uncultivated ground in grassland
and savanna habitats.

Low potential. The project site provides suitable
habitat for this species, but there are no occurrences
in the immediate vicinity of the project site. The
nearest CNDDB occurrence is 2.40 miles from the
project site.
*Federal = Federal Endangered (FE), Federal Threatened (FT), Federal Proposed Threatened (FPT); State = State Endangered (SE), State Threatened (ST), State Candidate (SC), State Rare (SR), Fully Protected (FP). Other = California Native Plant Society California Rare Plant Rank (1B) [plants rare, threatened, or endangered in California and elsewhere] and 2B [plants rare, threatened, or endangered in California, common elsewhere]; California Species of Special Concern (SSC) (animals). **No Potential (plants) – no associated habitat present; Low - associated plant communities present but lacking micro-habitat conditions (e.g., soil characteristics, hydrology, aspect/slope); Moderate - associated plant communities and one or more micro-habitat or similar conditions present; High Potential - associated plant communities and one or more micro-habitat or similar conditions present and documented occurrences in the project area or in contiguous habitat. Historical agricultural disturbance was also considered due to its effects on habitat quality, lowering the rankings for most species within the project site.

Page 202 of 1497 ends
Page 203 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -60 This page intentionally left blank

Page 204 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-61 Table 4.4.B: Preliminary Potential Impacts to Land Cover Types1 Impacted Land Cover
Linear Trail
Alternative
Pipeline
(Acres)
Peabody Road
Alternate
Pipeline
(Acres)
Plant Site (Acres) Total Acres
Developed 10.42 14.60 9.35 34.37
Nonnative Annual Grassland 9.38 6.28 14.88 30.54
Planted Area with Nonnative Annual Grassland 1.19 1.60 5.63 8.42 Riparian 0.44 0.40 0.00 0.84
Ruderal 3.29 3.07 0.00 6.36
Seasonal Wetland 0.21 0.00 1.62 1.83
Seasonal Wetland Pond 0.38 0.05 0.00 0.43
Union Creek 0.04 0.00 0.00 0.04
Grand Total 25.34 26.00 31.48 82.82
Source: Compiled by LSA (2026).
1 Based on preliminary project layouts. Actual impacted habitats may increase or decrease based on final project design.

Special-Status Plant Species. Impacts to grassland and seasonal wetland habitats could impact special-status plants, if present, through direct removal of individuals or indirect impacts caused by altered hydrology of seasonal wetlands adjacent to work areas or introduction of invasive species or noxious weeds during construction. To avoid or reduce potential impacts to special-status plants during construction, Mitigation Measures BIO-1 through BIO-8 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; the completion of protocol-level preconstruction special-status plant surveys for all potentially occurring species by a qualified botanist; completing consultation with CDFW and USFWS if special-status plant populations are present to determine appropriate mitigation measures and permit requirements; restoration of existing wetlands and uplands to pre-disturbance conditions at a 1:1 ratio; providing a temporary restoration plan for review and approval by regulatory agencies; and mitigating for loss of delineated vernal pool and upland habitat. With implementation of Mitigation Measures BIO-1 through BIO-8 during construction, impacts to special-status plants would be less than significant.

Vernal Pool Fairy Shrimp and Vernal Pool Tadpole Shrimp. Vernal pool fairy shrimp is listed as threatened under the ESA and vernal pool tadpole shrimp is listed as endangered under the ESA.

These species have the potential to occur in the large pond at the north end of the Project site and in seasonal wetlands within and adjacent to the site. Vernal pool fairy shrimp have also been documented breeding in seasonal pools on properties in the vicinity of the Project site. As shown in Table 4.4.B, construction activities associated with the Project have the potential to directly impact seasonal wetlands, which provide habitat for vernal pool fairy shrimp and vernal pool tadpole shrimp. Additional wetland areas could be indirectly affected through effects on hydrology in ponds and seasonal wetlands within or adjacent to the Project site depending on final Project design. To avoid or reduce potential impacts to vernal pool fairy shrimp and vernal pool tadpole shrimp, Mitigation Measures BIO-1, BIO-2, BIO-4 and BIO-5 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; restoring wetlands and uplands to pre-disturbance conditions to mitigate for temporary effects; and preserving vernal

Page 205 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -62 pool and swale habitats to mitigate for permanent effects. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-4 and BIO-5, impacts to vernal pool fairy shrimp and vernal pool tadpole would be less than significant.

Crotch’s Bumble Bee. Crotch’s bumble bee is a State Candidate for listing under the CESA. The Project would result in both temporary and permanent impacts to grassland habitat suitable for this species. Temporary impacts would occur during construction within work areas that would be restored following completion of construction, while permanent impacts would be limited to areas where Project facilities would permanently replace existing habitat. The Project could affect Crotch’s bumble bee through direct disturbance of nest sites during construction and through the temporary or permanent removal of suitable nesting and foraging habitat within nonnative annual grassland, landscaped areas containing nonnative grassland cover, and adjacent ruderal habitats.

To avoid or minimize potential impacts to Crotch’s bumble bee, Mitigation Measures BIO-1, BIO-2 to BIO-8, and BIO-9 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW, providing environmental awareness training to personnel working at the Project site, providing focused surveys for Crotch’s bumble bee, establishing non-disturbance buffers if Crotch’s bumble bees are detected during the focused survey, preparing and implementing a revegetation plan, and mitigating for loss of permanent impacts to grassland habitat. With Implementation of Mitigation Measures BIO-1, BIO-2 to BIO-8, and BIO-9, temporary and permanent impacts to Crotch’s Bumble Bee would be less than significant.

Monarch Butterfly. Monarch butterfly is proposed for listing under the ESA. The site provides potential foraging and possible breeding habitat for monarch butterfly, though there is no overwintering habitat for this species on or adjacent to the site. The presence of milkweed (obligate larval host plants) needed for reproduction is unknown at this time. Project activities could impact monarch butterfly movement, foraging, and breeding habitat through temporary and permanent direct impacts to larval host plants (milkweed) and a reduction in foraging habitat. To avoid or minimize potential impacts during construction to Monarch butterfly, Mitigation Measures BIO-1, BIO-2 to BIO-8, and BIO-10 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW, providing environmental awareness training to people working at the Project site, conducting preconstruction surveys for milkweed and nectar plants, placing buffers around milkweed and nectar plants if present during breeding season; reseeding temporarily impacted grassland areas, and mitigating for loss of permanent impacts to grassland habitat. With Implementation of Mitigation Measures BIO-1, BIO-2 to BIO-8, and BIO-10, impacts to Monarch butterfly would be less than significant.

California Tiger Salamander. California tiger salamander is listed as threatened under the ESA and the CESA. This species has the potential to occur in the large pond at the north end of the Project site as well as in the surrounding grasslands. This species has been documented breeding in seasonal pools on properties in the vicinity of the Project site. The Project could affect suitable upland and aquatic habitat during construction activities within nonnative grasslands and seasonal wetland ponds. The Project has the potential to negatively impact California tiger salamanders directly through death or injury if a burrow is crushed during construction activities or indirectly through effects on hydrology in a potential breeding pond adjacent to the Project

Page 206 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-63 site. Construction activities could also disrupt or block seasonal movements. To avoid or minimize potential temporary impacts to California tiger salamander, Mitigation Measures BIO-1, BIO-2, BIO-4 to BIO-8, BIO-11 and BIO-12 would be required which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; limiting ground-disturbing work to the dry season; only initiating ground disturbing activities after a 72-hour, no precipitation forecast is obtained and ceasing ground disturbance activities 24 hours prior to a 40 percent or greater chance of rain forecast; submitting a California Tiger Salamander Relocation Plan to CDFW and USFWS; installing a temporary barrier fence; completing daily preconstruction surveys by a qualified biologist; implementing best management practices under the Project’s SWPPP; and preserving grassland habitat at a 1:1 ratio for temporary impacts and 3:1 ratio for permanent impacts and creating

0.01 acre of breeding habitat for each acre of upland habitat permanently removed. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-4 to BIO-8, BIO-11 and BIO-12, potential temporary impacts to California tiger salamander would be less than significant.

Northwestern Pond Turtle. Northwestern pond turtle is proposed for listing under the ESA and is a California Species of Special Concern. This species is known to occur in Union Creek east of the Project site and may be present in aquatic habitats and in adjacent uplands in Union Creek, the City of Vacaville detention basin, the large pond at the north end of the Project site, and the smaller pond on the west side of the treatment plant. The pond turtle could also breed in the grasslands and landscaped areas within the Project site under either alignment. The Project has the potential to negatively impact northwestern pond turtle directly through death or injury to individuals or destruction of nesting sites during construction activities, or indirectly through temporary effects on hydrology or water quality in Union Creek or ponds adjacent to the Project site during construction. To avoid or reduce potential temporary impacts to Northwestern Pond Turtle, Mitigation Measures BIO-1, BIO-2, BIO-4 to BIO-8, and BIO-13 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting preconstruction surveys for northwestern pond turtle individuals and nests; relocating individual turtles by a qualified biologist and placing buffers around any active nests; installing exclusionary fencing; and implementing best management practices under the Project’s SWPPP. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-4 to BIO-8, and BIO-13, potential temporary impacts to Northwestern pond turtle would be less than significant.

Burrowing Owl. Burrowing owls are a candidate for listing under the CESA and are a California Species of Special Concern. Nonnative grassland within the Project site provides potential breeding and foraging habitat for this species. There may also be breeding habitat along the banks of the irrigation canal and old railroad grade. The CNDDB includes a record of a breeding pair present from 1986 to 1991 along the Putah South Canal that overlaps the Project site, and they have more recently been documented nesting and overwintering on nearby properties. The Project has the potential to temporarily impact burrowing owls through direct impacts to nesting sites that result in the destruction of eggs or young or through disturbance that results in nest abandonment and subsequent loss of eggs or young. The Project will also result in the loss of potential foraging habitat in grasslands and associated land cover types. To avoid or reduce potential temporary impacts to burrowing owl, Mitigation Measures BIO-1, BIO-2, BIO-6

Page 207 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -64 to BIO-8, and BIO-14 to BIO-16 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting preconstruction surveys for suitable burrows; following proper procedure should an active burrow be found; preserving suitable burrowing owl habitat at a 3:1 ratio; and preserving any lost nest sites at a 1:1 ratio. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-14 to BIO-16, potential temporary impacts to burrowing owl would be less than significant.

Swainson’s Hawk. Swainson’s hawks are listed as threatened under the CESA. Willow trees along the detention basin and Union Creek at the northern end of the pipeline alignment provide potential nesting habitat for this species, and grasslands along the remainder of the alignment provide suitable foraging habitat. Breeding pairs are known from several nearby locations and may forage within the boundaries of the Project site. The Project has the potential to negatively impact Swainson’s hawks through direct construction impacts to nesting sites that result in the destruction of eggs or young or through disturbance that results in nest abandonment and subsequent loss of eggs or young if work is conducted during the nesting season within 0.25 to

0.5 mile of an active nest. The Project may also result in the loss of foraging habitat in grasslands and associated land cover types. To avoid or reduce potential temporary impacts to Swainson’s hawks, Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-17 to BIO-18 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting preconstruction surveys to identify active nests; establishing buffers around Swainson’s hawk nests; and preserving 3 acres of valley floor grassland habitat for every 1 acre of permanent impact and retaining active and suitable nest trees. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-17 to BIO-18, temporary construction-related impacts to Swainson’s hawk would be less than significant.

Tricolored Blackbird. Tricolored blackbird are listed as threatened under the CESA and is a California Species of Special Concern. A tricolored blackbird breeding colony was identified in a patch of thistle within the NBRWTP in 2017 and continued nesting at the site for several years.

They are not currently known to breed at the site, but there could be nesting habitat present in the northern portion of the NBRWTP. Tricolored blackbirds regularly forage in the grasslands in northeastern Fairfield, and foraging habitat is present throughout the grasslands on the Project site. The Project has the potential to temporarily impact tricolored blackbirds through direct impacts to nesting sites that result in the destruction of eggs or young or through disturbance that results in nest abandonment and subsequent loss of eggs or young. The Project would also result in the loss of potential grassland foraging habitat. To avoid or reduce potential temporary impacts to tricolored blackbird, Mitigation Measures BIO-1, BIO-2, BIO-5 to BIO-8, and BIO-19 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting preconstruction surveys for tricolored blackbird colonies; and establishing a buffer around any tricolored blackbird colonies. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-5 to BIO-8, and BIO-19, temporary construction-related impacts to tricolored blackbird would be less than significant.

Page 208 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-65 Other Migratory Birds. Other special-status bird species that have the potential to nest within or adjacent to the Project site include white-tailed kite (Fully Protected), northern harrier (Species of Special Concern), loggerhead shrike (Species of Special Concern), grasshopper sparrow (Species of Special Concern), and short-eared owl (Species of Special Concern). In addition, grasslands, shrubs, and trees on and adjacent to the Project site provide potential nesting habitat for other native bird species protected under the Migratory Bird Treaty Act and California Fish and Game Code. Active nests (i.e., nests containing viable eggs or young) of native birds could be adversely affected by Project construction activities through direct impacts to nesting sites that result in the destruction of eggs or young or through disturbance that results in nest abandonment and subsequent loss of eggs or young. To avoid or minimize potential construction-related impacts to other migratory birds, Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-20 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting a nesting bird survey; and establishing a buffer around any nest sites. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-20, temporary construction-related impacts to other migratory birds would be less than significant.

American Badger. American badger is a California Species of Special Concern. Grasslands within the Project site provide potential denning and foraging habitat for this species. The Project has the potential construction-related impacts American badger directly through injury or death of adults or young if a den is crushed during construction activities or indirectly through the loss of suitable grassland habitat. To avoid or reduce potential temporary impacts to American badger, Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO-21 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; providing environmental awareness training to people working at the Project site; conducting a survey for American badger burrows; and establishing buffers should any active badger dens be identified. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-6 to BIO-8, and BIO- 21, temporary construction-related impacts to American badgers would be less than significant. b. Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less Than Significant with Mitigation Incorporated. The Biological Resources Report (Attachment B) identifies several sensitive natural communities within the Project area, including riparian habitat associated with Union Creek and the City of Vacaville detention basin, as well as seasonal wetlands and other jurisdictional waters. These communities are considered sensitive under CEQA and are subject to State and federal regulatory protections.

Implementation of the NBRWTP improvements, which are common to both pipeline alignments, could temporarily and permanently affect sensitive natural communities within the facility.

Specifically, construction could temporarily affect and permanently remove approximately 0.5 acre of riparian habitat located along the edge of the City of Vacaville detention basin adjacent to Union Creek at the northern end of the NBRWTP.

Page 209 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -66 In addition to the common impacts associated with the NBRWTP, implementation of the Linear Trail Pipeline Alignment could result in temporary construction-related impacts to Union Creek where the pipeline would cross the creek. The Linear Trail Pipeline Alignment could also temporarily and permanently affect seasonal wetlands along the pipeline corridor and at the northern end of the NBRWTP, where trenching and associated construction activities would occur within or adjacent to jurisdictional wetland features.

Implementation of the Peabody Road Pipeline Alignment could also result in temporary construction-related impacts to Union Creek where the pipeline would cross the creek. However, because this alignment primarily follows an existing roadway corridor and avoids most seasonal wetland features present along the Linear Trail Pipeline Alignment, impacts to sensitive natural communities would be limited primarily to the Union Creek crossing and would be less extensive than those associated with the Linear Trail Pipeline Alignment.

Construction activities, including pipeline installation, grading, and work near Union Creek, could result in:
• Removal or disturbance of riparian vegetation
• Temporary and permanent loss of wetland and other sensitive habitats • Alteration of hydrology and drainage patterns
• Habitat fragmentation or degradation
To avoid or reduce potential temporary construction-related impacts to sensitive natural communities, implementation of Mitigation Measures BIO-4, BIO-5, BIO-22 and BIO 23 would be required, which entail obtaining the necessary permits under Sections 404 and 401 of the federal Clean Water Act, the Porter-Cologne Water Quality Control Act, and Section 1602 of the California Fish and Game Code and implementing permit conditions; evaluating alternatives that avoid fill in any vernal pools, seasonal wetlands, or Union Creek; restoring wetland habitat at a 1:1 ratio for temporary impacts and a minimum 2:1 ratio for permanent impacts; and replacing native woody vegetation according to appropriate ratios and performance standards. With implementation of Mitigation Measures BIO-4, BIO-5, BIO-22 and BIO 23, temporary construction-related impacts to riparian habitat and other sensitive natural communities would be less than significant. c. Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Less Than Significant with Mitigation Incorporated. As described in the Biological Resources Report (Appendix B), there are seasonal wetlands within the NBRWTP and along both of the proposed pipeline alignments. However, most of the wetlands are isolated with no direct connection to Union Creek or other navigable waters and, therefore, are likely not federally jurisdictional under current regulations. However, the determination of federal jurisdiction is subject to verification by the United States Army Corps of Engineers. Even if wetlands are not subject to federal protection under Section 404 of the Clean Water Act, the wetlands in the Project area are subject to regulation by the State of California under the Porter-Cologne Act.

Page 210 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-67 Construction activities associated with the Project have the potential to result in:
• Direct removal or fill of wetlands,
• Temporary disturbance of jurisdictional waters,
• Alteration of hydrology or drainage patterns, and
• Degradation of wetland function and habitat value.

To avoid or minimize potential temporary and permanent construction-related impacts to wetlands, implementation of Mitigation Measures BIO-1, BIO-2, BIO-4, BIO-5, and BIO-22 would be required, which entail obtaining all required authorizations from USFWS and/or CDFW; mitigating for loss of modeled vernal pool and upland habitat; and obtaining the necessary permits under Sections 404 and 401 of the federal Clean Water Act, the Porter-Cologne Water Quality Control Act, and Section 1602 of the California Fish and Game Code and implementing permit conditions. With implementation of Mitigation Measures BIO-1, BIO-2, BIO-4, BIO-5, and BIO-22 temporary and permanent construction-related impacts to wetlands would be less than significant. d. Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Less Than Significant with Mitigation Incorporated. Habitat linkages provide broad connections between larger habitat areas that are separated by development. Wildlife corridors are similar to linkages but provide specific pathways for animals to disperse or migrate between areas. A corridor can be defined as a linear landscape feature of sufficient width to allow animal movement between two comparatively undisturbed habitat fragments. Wildlife corridors are features that allow for the dispersal, seasonal migration, breeding, and foraging of a variety of wildlife species. Adequate cover is essential for a corridor to function as a wildlife movement area. It is possible for a habitat corridor to be adequate for one species yet still inadequate for others. Additionally, open space can provide a buffer against both human disturbance and natural fluctuations in resources.

The Project area includes a mix of developed areas, non-native grassland habitat, and aquatic features such as Union Creek, which may support movement of wildlife species at a local scale.

These features may provide opportunities for foraging, dispersal, and limited movement for common wildlife species, and potentially for special-status species associated with aquatic or riparian habitats. However, the Project area is not identified in regional or local plans as a mapped or designated wildlife corridor, nor does it support large, contiguous natural habitats typically associated with regional-scale wildlife movement. Existing development, infrastructure, and roadway networks in the vicinity already limit wildlife movement opportunities, and the Project is not considered a critical linkage area.

Project implementation would involve construction activities such as trenching, grading, and temporary disturbance associated with pipeline installation and facility expansion. These activities could result in:
• Temporary disturbance to wildlife movement during construction • Short-term displacement of species from active work areas • Potential temporary impacts to aquatic species during in-channel or near-channel work

Page 211 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -68 However, the Project would not introduce permanent barriers to movement. Both pipeline alignments would be buried and disturbed areas would be restored following construction; therefore, neither alignment would inhibit wildlife movement across the area once construction is complete. No fencing, walls, or other features that would impede wildlife movement would be introduced. Aquatic crossings would be designed to maintain hydrologic connectivity and allow continued passage of aquatic species.

Infrastructure that would be constructed within the water treatment plant is not expected to cause any changes to wildlife movement patterns. There are no structures, caves, or other features suitable for bat maternity roosts on or adjacent to the Project site. There are currently no known wildlife nursery sites on or adjacent to the property, although tricolored blackbirds nested in a thistle patch within the treatment plant for several years starting in 2017. The grasslands along the proposed pipeline alignment, banks along the irrigation canal and old railroad grade, and the riparian trees at the north end of the alignment provide additional habitat for nesting birds.

Potential temporary construction-related impacts to nesting birds would be addressed with preconstruction bird surveys and protection measures described under Mitigation Measure BIO-20.

Temporary impacts to California tiger salamander movement between aestivation and breeding sites will be addressed through protection measures described in Mitigation Measure BIO-11.

With implementation of Mitigation Measures BIO-11 and BIO-20, impacts related to wildlife movement, migratory corridors, or nursery sites would be less than significant. e. Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Less Than Significant with Mitigation Incorporated. The Project is subject to applicable City of Fairfield General Plan policies and Municipal Code provisions related to biological resources, including requirements for protection of sensitive habitats, trees, and wildlife resources. These may include tree protection or replacement requirements, restrictions on removal of protected species, and compliance with applicable environmental regulations during construction. The Open Space, Conservation, and Recreation Element of the General Plan outlines policies to protect natural resources, including special-status plants and animals, oak trees, and sensitive habitats. The City’s Section 25.36 Tree Conservation ordinance defines protected trees as:

A. All trees on public property.

B. Trees planted or preserved on private property or within the public right of way which were:

1. Required by the City as a condition of approval for the project; or

2. Shown on a landscape drawing or plan for a project approved by the City.

C. The following species of trees are located on undeveloped private properties which exceed 6 inches in caliper or diameter at breast height. Breast height is measured at a point located 4-1/2 feet above the existing ground level of the tree:

Page 212 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-69

1. Native Oaks Quercus

2. Bay Laurel Umbelluraria californica

3. Madrone Arbutus menziesi

4. Buckeye Aesculus californica
D. Trees or groups of trees having one or more of the following characteristics, as determined by the City during project review or through special studies:

1. Demonstrated habitat value.

2. Historical or cultural value, as documented by published sources.

3. Important aesthetic value.

4. Uniqueness or rarity.

5. Unusual size or age.

Numerous native trees are present on the northern portions of the water treatment plant to the west, the north, and the east of the solar arrays. Many or all of these trees may have been planted using tree mitigation funds acquired by the City for tree removal permits. Therefore, these trees may meet the ordinance criteria for protected trees. The ordinance prohibits any person or City department to remove, cut down, conduct excessive unnatural pruning, topping, or disfigurement of any protected tree, or perform any act which results in the premature death or decline of a protected tree unless a Tree Removal Permit has been obtained. The Project may require removal or disturbance of vegetation, including grassland and potentially individual trees associated with riparian or developed areas. However, any such activities would be conducted in compliance with applicable City regulations, as stipulated by Mitigation Measure BIO-23.

With implementation of Mitigation Measure BIO-23, temporary construction-related impacts related to conflicts with any local policies or ordinances protecting biological resources would be less than significant.
f. Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
Less Than Significant with Mitigation Incorporated. The Project site and pipeline alignments falls within the Solano Multispecies HCP area, which covers all of Solano County and a small portion of Yolo County 26. The Solano HCP is undergoing final review by the regulatory agencies and has not yet been fully approved. All mitigation measures for special-status species provided in this report comply with the draft HCP, and the Project is not expected to conflict with the ability to implement the conservation program under the HCP. With implementation of Mitigation Measures BIO-1 through BIO-13, temporary and permanent project-related impacts related to conflicts with an adopted HCP would be less than significant.
26 Solano County Water Agency (SCWA). 2025. Multispecies Habitat Conservation Plan. Prepared for United States Fish and Wildlife Service. Sacramento.

Page 213 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -70

4.4.4 Mitigation Measures
The mitigation measures presented below incorporate all the recommendations provided in Biological Resources Report (Appendix B). To improve clarity and avoid redundancy, measures with overlapping requirements were consolidated by species and applicable timing windows, while retaining all species-specific avoidance, minimization, monitoring, and seasonal requirements identified in the biological analysis.

Mitigation Measure BIO-1 Permitting and Regulatory Compliance. The Project applicant(s) shall obtain all required authorizations from the United States Fish and Wildlife Service (USFWS) and/or the California Department of Fish and Wildlife (CDFW) for actions resulting in the incidental take of or effects on listed, candidate, or proposed species under the Endangered Species Act (ESA) and/or the California Endangered Species Act (CESA) prior to the start of construction and shall comply with all avoidance, minimization, and mitigation requirements specified in the permit(s).

Mitigation Measure BIO-2 Onsite Worker Environmental Awareness Training. Prior to the initiation of work, an environmental awareness training shall be provided by a qualified biologist to all people working at the Project site. The training shall be conducted by a qualified biologist and shall include a discussion of biology and general behavior, distribution and habitat needs, sensitivity to human activities, and status pursuant to the ESA and the CESA for all special-status species potentially impacted by the Project. The training shall also include information on Project-specific protection measures and penalties for violations. Interpretation shall be provided for non-English-speaking workers, and the same instruction shall be provided to any new workers before they are authorized to perform work at the Project site. Upon completion of the program, employees shall be required to sign a form stating they attended the training and understand all protection measures.

Mitigation Measure BIO-3 Special Status Plants. A qualified botanist shall conduct protocol-level preconstruction special-status plant surveys in accordance with CDFW’s 2018 Protocol for Surveying and Evaluating Impacts to Special-Status Native Plant Populations and Sensitive Natural Communities, or subsequent applicable CDFW guidance, and during the appropriate blooming or identifiable period for potentially occurring species. The surveys shall be conducted no more than two growing seasons prior to and no later than the blooming period prior to the start of ground-disturbing activities. If no special-status plants are found during focused surveys, no additional mitigation is required.

Page 214 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-71 If special-status plant populations are present, the Project applicant(s) shall consult with CDFW and USFWS, as appropriate, to determine appropriate mitigation measures and permit
requirements for direct and indirect impacts on any special-status plant population. In general, special-status plant populations shall be avoided to the maximum extent feasible. Possible avoidance measures include fencing populations before construction and exclusion of Project activities from the fenced-off areas, and construction monitoring by a qualified botanist to keep construction crews away from the population.

Temporary effects to seasonal wetlands and uplands supporting special-status plants lasting no more than one growing season shall be mitigated by restoring the existing wetlands and uplands to pre-disturbance conditions by the end of the following growing season at a 1:1 ratio. Long-term effects lasting longer than one growing season shall be mitigated as though they are permanent impacts under Mitigation Measure BIO-4, below.

The applicant shall provide a temporary restoration plan for review and approval by the regulatory agencies to ensure successful restoration of temporarily disturbed areas and any affected special-status plant populations prior to completing the Project. All temporarily affected habitats shall be monitored for a minimum of two growing seasons to document that wetland hydrology and vegetation have been restored to pre-Project conditions. Additional monitoring and remedial measures, including possible mitigation, may be required if hydrology is not reestablished or special-status plants fail to meet performance criteria established in the restoration plan.

Mitigation Measure BIO-4 Vernal Pool and Upland Habitat Conservation. Prior to the initiation of ground-disturbing activities, the Project Applicant shall mitigate for the permanent loss of modeled vernal pool and associated upland habitat supporting special-status plant and wildlife species.

Habitat mitigation shall be accomplished through one or a combination of the following: (1) purchase of credits at an approved mitigation bank; (2) onsite habitat preservation; (3) offsite conservation lands; or (4) another mitigation strategy approved by the applicable regulatory agencies that provides equivalent conservation value. All mitigation lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism.

Where appropriate, habitat mitigation may overlap with mitigation required for Crotch’s bumble bee, monarch butterfly, California

Page 215 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -72 tiger salamander, burrowing owl, and Swainson’s hawk, provided all applicable mitigation requirements and habitat functions are fully achieved.

Mitigation Measure BIO-5 Wetland Restoration and Compensation. Consistent Temporary impacts to seasonal wetlands and associated uplands that persist for no more than one growing season shall be restored to pre-disturbance conditions no later than the end of the first growing season following construction. Prior to construction, the Project Applicant shall prepare and submit a Wetland Restoration Plan, for approval by the applicable regulatory agencies. The plan shall include restoration methods, performance standards, contingency measures, and a monitoring program. Restored wetlands shall be monitored for a minimum of two wet seasons to document
successful restoration of hydrology and native vegetation. If monitoring demonstrates that hydrology or vegetation has not been restored to pre-project conditions, additional monitoring, adaptive management, remedial actions, or compensatory mitigation shall be implemented in consultation with the applicable regulatory agencies. Permanent wetland impacts shall be mitigated as follows:
• Indirect impacts to avoided vernal pools and swales located within 250 feet of project development shall be compensated through preservation of comparable habitat at a minimum ratio of 1:1.
• Direct impacts to vernal pools and swales shall be compensated through preservation at a minimum ratio of 2:1 and restoration at a ratio of 1:1 where restored habitat is established and functional prior to project impacts, or 2:1 where restoration occurs concurrent with or after project impacts.

Mitigation Measure BIO-6 Grassland Restoration. All temporarily disturbed grassland habitat shall be restored using native plant plugs, native forb seed mixes, or other appropriate plant materials that are compatible with pre-project habitat conditions. A Grassland Revegetation Plan shall be submitted to the California Department of Fish and Wildlife (CDFW) for review and approval at least 90 days prior to implementation.

Temporary impacts to seasonal wetlands and associated uplands that persist for no more than one growing season shall be restored to pre-disturbance conditions no later than the end of the first growing season following construction.

The plan shall identify restoration methods, seed and plant sources, success criteria, monitoring requirements, contingency measures, and measures to provide suitable habitat for Crotch’s bumble bee

Page 216 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-73 and monarch butterfly, including the use of insecticide-free flowering species that provide pollen and nectar resources. All seed and plant materials shall originate from stock collected within California’s Great Central Valley unless otherwise approved in writing by CDFW. Neonicotinoid insecticides shall not be used within restoration areas. Revegetation shall be completed as soon as practicable and no later than one year following completion of construction in the affected area. Monitoring shall continue until performance standards identified in the approved Revegetation Plan are achieved.

Where appropriate, grassland restoration may also satisfy mitigation requirements for Crotch’s bumble bee, monarch butterfly, California tiger salamander, burrowing owl, and Swainson’s hawk, provided all species-specific mitigation requirements are met.

Mitigation Measure BIO-7 Indirect Upland Habitat Protection. Indirect impacts to avoided upland habitat located within 250 feet of project development shall be mitigated through preservation of comparable upland habitat at a minimum ratio of 1:1. Mitigation shall be accomplished through purchase of mitigation credits, onsite preservation, offsite conservation lands, or another mitigation strategy approved by the applicable regulatory agencies. All mitigation lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism.

Where appropriate, mitigation may overlap with habitat mitigation required for Crotch’s bumble bee, monarch butterfly, California tiger salamander, burrowing owl, and Swainson’s hawk, provided all applicable mitigation requirements are met.

Mitigation Measure BIO-8 Permanent Upland Habitat Compensation. Permanent direct impacts to upland habitat shall be mitigated through preservation of suitable habitat at a minimum ratio of 3:1. Mitigation shall be accomplished through one or a combination of the following: (1) purchase of credits at an approved mitigation bank; (2) onsite habitat preservation; (3) offsite conservation lands; or (4) another mitigation strategy approved by the applicable regulatory agencies that provides equivalent conservation value. All mitigation lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism. temporarily disturbed grassland.

Where appropriate, upland habitat mitigation may overlap with mitigation required for Crotch’s bumble bee, monarch butterfly,

Page 217 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -74 California tiger salamander, burrowing owl, and Swainson’s hawk, provided all applicable mitigation requirements are fully satisfied.

Mitigation Measure BIO-9 Minimize Take and Adverse Effects on Crotch’s Bumblebee. A qualified biologist shall conduct a focused survey of all suitable habitat within and adjacent to the Project before the start of any ground-disturbing activities at a time when Crotch’s bumble bee is most likely to be identified, typically from April through August when floral resources and ideal weather conditions are present.

Surveys shall follow the methods in Survey Considerations for California Endangered Species Act (CESA) Candidate Bumble Bee Species (CDFW 2023) or any subsequent protocol approved by CDFW. If Crotch’s bumble bees are not detected during the focused survey, no additional mitigation is required.

If Crotch’s bumble bees are detected during the focused survey, non-disturbance buffers shall be established around active nesting colonies until a qualified biologist has determined that they are no longer active. The size of the buffer shall be determined by the qualified biologist in consultation with CDFW but shall typically be at least 50 feet. The buffer shall be delineated using high-visibility fencing, flagging, or similar materials along with appropriate signage. Construction personnel shall be informed of the nest location and avoidance requirements during the preconstruction environmental awareness training. Use of neonicotinoid insecticides shall not be used within non-disturbance buffers. Preconstruction surveys shall be completed prior to the initiation of ground-disturbing activities during the active season for Crotch’s bumble bee. Nest avoidance measures and buffers shall be maintained throughout construction while the nest remains active.

If Crotch’s bumble bee is detected and take cannot be avoided through implementation of avoidance measures, the Project applicant shall obtain applicable incidental take authorization from CDFW prior to conducting activities that could result in take and shall comply with the terms and conditions of such authorization.

Mitigation Measure BIO-10 Minimize Take and Adverse Effects on Monarch Butterfly.

Preconstruction surveys for milkweed and nectar plants shall be conducted during the monarch breeding season (March 16 through November 30) to determine if milkweed is present within the site and is being used for monarch breeding. Surveys shall be conducted by a qualified biologist no more than 14 days prior to ground or vegetation disturbance. The biologist shall search for evidence of monarch eggs, caterpillars, chrysalises, and adults. If no active monarch breeding is identified, no further mitigation is required.

Page 218 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-75 If milkweed is present and monarch eggs, larva, or pupa (chrysalis) are present during breeding season from March 16 to November 30, buffers shall be placed around patches of milkweed and associated nectar plants. No vegetation removal or herbicide use may occur inside of the buffers. Buffer size shall be determined by the qualified biologist in consultation with USFWS; the expected buffer size is 125 feet. Buffers shall remain in place throughout the monarch breeding season or until all monarch breeding activity has been completed.

Vegetation removal is allowed without restriction between December 1 and March 15.

Mitigation Measure BIO-11 Minimize Take and Adverse Effects on California Tiger Salamander.

To minimize the potential for take of California tiger salamander, initial ground-disturbing activities within designated tiger salamander habitat areas shall be limited to the dry season (June 15 and October 15), unless otherwise approved by CDFW and USFWS and/or as approved through the permitting process outlined in MM-BIO-01. Ground-disturbing activities may only commence following confirmation of a 72-hour forecast from the National Weather Service (NWS) indicating no precipitation at the Project site. Ground disturbance shall cease at least 24 hours before the NWS forecasts a 40 percent or greater chance of precipitation and may resume no sooner than 24 hours after rainfall has ended, provided no precipitation is forecast within the subsequent 24-hour period.

At least 30 days prior to the initiation of construction, the Project Applicant shall prepare and submit a California Tiger Salamander Relocation Plan to CDFW and USFWS for review and approval. The approved plan shall describe relocation procedures, suitable release locations, monitoring requirements, and reporting protocols.

A temporary barrier fence shall be installed prior to the start of work to prevent California tiger salamanders from entering the Project site. The fence shall be designed to allow California tiger salamanders to leave the Project site using one-way funnels or other methods approved by regulatory agencies. The fence shall remain in place until work is completed, including during periods of inactivity. Coverboards shall be placed along the fence on both sides to provide refuge. A qualified biologist shall inspect fencing and cover boards daily during active work periods and weekly during periods of inactivity or during and following storm events. Animals found within the Project site may be relocated outside of the barrier by a qualified biologist in accordance with an approved relocation plan.

Page 219 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -76 Daily California tiger salamander preconstruction surveys shall be conducted by a qualified biologist. The biologist shall survey suitable habitat within the work area prior to disturbance. The survey shall also include all construction pipes, culverts, and similar structures if they are not capped to prevent animal entry. If a California tiger salamander is found, the qualified biologist may move it out of the work area in accordance with an approved relocation plan.

If take of California tiger salamander cannot be avoided, prior to conducting activities that could result in take, the Project applicant shall obtain applicable incidental take authorization from CDFW pursuant to CESA and authorization from USFWS pursuant to the federal Endangered Species Act, as applicable, and shall comply with the terms and conditions of such authorization.

Mitigation Measure BIO-12 California Tiger Salamander Habitat Compensation. To compensate for impacts to California tiger salamander habitat and movement corridors, the Project Applicant shall implement habitat mitigation.

Temporary impacts to upland grassland habitat shall be
compensated through preservation or restoration at a minimum ratio of 1:1. Permanent impacts to upland habitat shall be compensated through preservation at a minimum ratio of 3:1.

Habitat mitigation may be accomplished through approved mitigation banks, onsite preservation, offsite conservation lands, or another mitigation strategy approved by the applicable regulatory agencies. Preserved lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism.

In addition, the Project Applicant shall create a minimum 0.01 acre of California Tiger Salamander breeding habitat for each acre of upland habitat permanently removed. Created breeding habitat shall consist of seasonal wetlands meeting the following minimum criteria:
• Each wetland created as breeding habitat shall be a minimum of

0.02 acre.
• Multiple created compensatory breeding habitats may be clustered within 1,300 feet of each other
• Created wetland shall be within 2,100 feet of known breeding habitat
• Created wetlands shall be located within or adjacent to at least 300 contiguous acres of suitable upland habitat.

Page 220 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-77 A Habitat Mitigation and Breeding Habitat Creation Plan shall be submitted to CDFW and USFWS for review and approval prior to implementation. The plan shall include construction
specifications, performance standards, long-term management, monitoring, adaptive management measures, and financial assurances sufficient to ensure successful establishment of breeding habitat.

Mitigation Measure BIO-13 Minimize Take and Adverse Effects on Northwestern Pond Turtle.

A qualified biologist shall conduct a preconstruction survey for northwestern pond turtles and active nests within all suitable aquatic habitat and potential nesting habitat (upland loose soils, sands, sediment bars, grassy areas, or duff that is within 1,500 feet of a waterways which may support breeding or hibernation).

Surveys shall be completed within seven days prior to the initiation of ground-disturbing activities and shall encompass the construction footprint and a minimum 100-foot buffer. Surveys shall be conducted under suitable environmental conditions including sunny days between 9:00 a.m. and 4:00 p.m., with air temperatures between 55 and 90 degrees Fahrenheit, and wind speeds less than 12 miles per hour.

Individual turtles may be relocated by a qualified biologist to an appropriate nearby location, if necessary. Relocation areas shall be approved by the CDFW prior to the relocation of any turtles. If an active nest is found, a 50-foot buffer shall be placed around the nest. No work shall occur within the buffer until the eggs have hatched or the nest is no longer active, as determined by a qualified biologist.

Prior to the start of Project activities, exclusionary fencing shall be installed around the work area to ensure that northwestern pond turtles are kept out of the construction area. The fencing shall be maintained throughout the duration of construction. The integrity of the exclusion fencing shall be checked daily by a biological monitor. Additionally, a biological monitor shall check the work area every morning before construction begins to ensure that no turtles are within the exclusion area.

Mitigation Measure BIO-14 Minimize Take and Adverse Effects on Burrowing Owls. A qualified biologist shall conduct a preconstruction survey in accordance with CDFW’s 2012 Staff Report on Burrowing Owls (CDFG 2012). Surveys for nesting burrowing owls shall be conducted if Project construction starts during nesting season (February 1 to August 31), and surveys for wintering burrows owls shall be conducted if the construction starts during the wintering season (September 1 to

Page 221 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -78 January 31). The surveys shall encompass the Project area and surrounding suitable habitat within the applicable survey area as identified in CDFWs 2012 Staff report on Burrowing Owl Mitigation, to the extent that access is available or the area can otherwise be adequately surveyed, to detect burrowing owls that may be affected by Project activities. Surveys shall occur each year of Project construction, as conditions may change annually and suitable refugia for burrowing owl, such as small mammal burrows, can be created within a few hours or days, unless otherwise approved in writing by CDFW. Time lapses between surveys or Project activities shall trigger subsequent surveys including, but not limited to, a final survey within 24 hours prior to ground disturbance.

If an active burrow is found during the non-breeding season (September 1 through January 31) and cannot be avoided or adequately protected, the Project applicant shall obtain the necessary incidental take permit from the CDFW and may evict the owls from the area using passive relocation as described in CDFW’s Staff Report on Burrowing Owls (CDFG 2012) or as specified in the incidental take permit.

If an active burrow is found during the breeding season (February 1 through August 31), an appropriate avoidance buffer shall be established by the qualified biologist in accordance with CDFW’s 2012 Staff Report on Burrowing Owl Mitigation, based on the season, type and intensity of Project activity, existing site conditions, and anticipated potential for disturbance. The buffer shall be maintained until the burrow is no longer occupied or the qualified biologist determines that Project activities would not result in disturbance or take. If take cannot be avoided, the Project applicant shall obtain applicable incidental take authorization from CDFW prior to conducting activities that could result in take.

Mitigation Measure BIO-15 Burrowing Owl Habitat Compensation. Project applicants shall mitigate for the permanent loss or conversion of burrowing owl habitat (i.e., valley floor or vernal pool grassland) by preserving suitable habitat at a 3:1 ratio. Habitat mitigation may be accomplished through one or a combination of the following:
(1) purchase of credits at an approved mitigation bank; (2) onsite habitat preservation; (3) offsite conservation lands; or (4) another mitigation strategy approved by the applicable regulatory agencies that provides equivalent conservation value. All mitigation lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism.

Page 222 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-79 Where appropriate, preserved grassland habitat may also satisfy habitat mitigation requirements for California tiger salamander and Swainson’s hawk, provided all species-specific mitigation requirements and habitat functions are fully achieved.

Mitigation Measure BIO-16 Burrowing Owl Nest Compensation. If preconstruction surveys identify active burrowing owl nests that cannot be avoided and would be permanently lost as a result of Project activities the Project Applicant shall mitigate the loss through permanent preservation of occupied or otherwise suitable burrowing owl nest sites at a minimum of ratio of 1:1, consistent with the applicable CDFW guidance.

Preservation sites shall include suitable nesting and foraging habitat and be within Solano County, unless otherwise approved by agency review. Preserved lands shall be permanently protected through a conservation easement or other approved long-term protection mechanism and shall be managed in perpetuity under an approved long-term management and monitoring plan.

Mitigation Measure BIO-17 Minimize Take and Adverse Effects on Swainson’s Hawk. A qualified biologist shall conduct preconstruction surveys to identify active Swainson’s Hawk nests on and within 0.5 mile of the Project site. The surveys shall be conducted no more than 14 days prior to the start of construction. Guidelines provided in Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in the Central Valley (Swainson’s Hawk Technical Advisory Committee 2000) shall be followed. If no nests are found, no further mitigation is required.

If a Swainson’s hawk nest is found, a buffer shall be established around the nest. No work shall be conducted within the buffer until a qualified biologist has determined that the young have fledged or the nest is no longer active. CDFW guidelines recommend implementation of 0.25- or 0.5-mile-wide buffers, but the size of the buffer may be adjusted if a qualified biologist, in consultation with CDFW, determines that such an adjustment would not be likely to adversely affect the nest. Monitoring of the nest by a qualified biologist during and after construction activities shall be required if the activity has potential to adversely affect the nest. An incidental take permit (Mitigation Measure BIO-1) from CDFW may be required if construction disturbance could result in abandonment or lowered productivity of an active nest.

Mitigation Measure BIO-18 Swainson’s Hawk Habitat Compensation. Permanent impacts to suitable Swainson’s hawk foraging habitat shall be mitigated

Page 223 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -80 through the preservation of suitable foraging habitat at a ratio of 3 acres preserved for every 1 acre. Active and suitable nest trees within and adjacent to foraging habitat be retained through (1) permanent preservation of the species’ foraging habitat through a conservation easement and implementing and funding a long-term management plan in perpetuity, or (2) purchase of Swainson’s hawk foraging habitat credits at a CDFW-approved mitigation bank in the Solano County. This mitigation can be concurrent with mitigation for California tiger salamander habitat under Mitigation Measure BIO-4 provided the valley floor grassland habitat preserved is suitable for both species.

Mitigation Measure BIO-19 Minimize Take and Adverse Effects on Tricolored Blackbirds. To avoid and minimize impacts to tricolored blackbird, the Project applicant(s) shall conduct a preconstruction survey prior to any Project activity that would occur during the nesting season (February 1–August 31). The preconstruction survey shall be conducted by a qualified biologist before any activity occurring within 500 feet of suitable nesting habitat, including freshwater marsh, riparian scrub, and ruderal (weedy) areas. The survey shall be conducted within 5 days prior to the start of Project activity. As Tricolored blackbirds may renest late in the breeding season an additional survey may be required later in the breeding season (summer) depending on the timing of construction and availability of nesting habitat within or adjacent to the project. If no tricolored blackbird colony is present, no further mitigation is required.

If a colony is found, the qualified biologist shall establish a buffer around the nesting colony. No Project activity shall commence within the buffer area until a qualified biologist confirms that the colony is no longer active. The size of the buffer shall be determined in consultation with CDFW. Buffer size is anticipated to range from 100 to 500 feet, depending on the nature of the Project activity, the extent of existing disturbance in the area, and other relevant circumstances.

The preconstruction survey shall be conducted by a qualified biologist before any activity occurring within 500 feet of suitable nesting habitat, including freshwater marsh, riparian scrub, and ruderal (weedy) areas.

Mitigation Measure BIO-20 Minimize Take and Adverse Effects on Other Migratory Birds. A nesting bird survey shall be conducted by a qualified biologist prior to any ground disturbing work occurring during the nesting season (February 1 to August 31). The survey shall extend out 500 feet from the boundaries of the Project site to the extent feasible based on

Page 224 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-81 land uses and ownership of surrounding properties. The survey shall be completed no more than 5 days prior to the start of work. If no nests are found, no further mitigation is required.

If an active nest is found, the qualified biologist shall establish a buffer around the nest site that shall be avoided until the young have fledged or the nest has otherwise become inactive. The size of the buffer shall be determined by the qualified biologist based on the nesting bird species and the context of the nest location relative to potential disturbance activities. Buffer size is expected to range from 50 to 500 feet, depending on the bird species, the nature of the Project activity, the extent of existing disturbance in the area, and other relevant circumstances. If ground-disturbing activities cease for 5 consecutive days or more during the nesting season, an additional nesting bird survey shall be completed prior to resuming such activities.

Mitigation Measure BIO-21 Minimize Take and Adverse Effects on American Badgers. A qualified biologist shall conduct a survey for American badgers no more than 14 days prior to the initiation of ground‐disturbing activities. Surveys shall consist of walking parallel transects looking for badger burrows and signs. If no badger dens are found, no further mitigation is required.

If active badger dens are identified, a non-disturbance buffer of 200 feet shall be established around the den and associated occupied areas. If avoidance is not feasible, a biologist shall determine if the burrow is being used as an active maternity den through use of remote cameras. If young are determined to be present, the burrow shall be avoided until a qualified biologist has determined that the young have vacated the burrow. If the burrow is determined not to be an active maternity den and young are not present, a one‐way eviction door may be installed between September 1 and January 1 to passively relocate the badger after consultation with CDFW. If the badger digs back into the burrow, CDFW staff may allow the use of live traps to relocate badgers to suitable habitat outside of the Project area.

Mitigation Measure BIO-22 Wetland Mitigation and Resource Agency Permits. Prior to the start of work, the Project applicant(s) shall secure the necessary permits under Sections 404 and 401 of the federal Clean Water Act, the Porter-Cologne Water Quality Control Act, and Section 1602 of the California Fish and Game Code, and shall implement all permit conditions to ensure no net loss of functions and values of wetlands and other waters of the United States and State of California.

Page 225 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -82 During the Project design, the Project applicant(s) shall evaluate alternatives that avoid fill in any vernal pools, seasonal wetlands, or Union Creek. Where fill of aquatic communities cannot be avoided, documentation shall be provided explaining why avoidance is not practicable. This analysis shall be consistent with the Environmental Protection Agency’s (EPA) Section 404(b)(1) guidelines, as required by the United States Army Corps of Engineers and as adopted by the State Water Resources Control Board.

Temporary impacts to wetland habitat shall be restored at a 1:1 ratio. Permanent impacts shall require establishment of new wetlands at a minimum 2:1 ratio. Mitigation shall be provided through one or a combination of the following: (1) purchase of credits at an approved mitigation bank; (2) onsite habitat preservation; (3) offsite conservation lands; or (4) another approved mitigation strategy that achieves equivalent conservation outcomes.

This mitigation can overlap with and be satisfied by wetland mitigation for special-status plants under Mitigation Measure BIO-4.

Mitigation Measure BIO-23 Tree Preservation. All native, woody vegetation greater than 1 inch in diameter at breast height removed during project activities shall be replaced by planting native woody vegetation at the following minimum ratios and performance standards:

The number of native riparian plants that become established at the end of a minimum of the 5-year monitoring period shall equal a minimum of 80 percent of total required plantings. Established plants may include natural regeneration and volunteer plants.

The Project shall inventory all trees planned for removal to assess their status as protected trees. If protected trees are to be removed, the water treatment plant shall obtain applicable tree removal permits and mitigate tree removal consistent with Ordinance 25.36 that encourages the replacement of protected trees on an inch-for-inch basis determined by diameter at breast height (4-1/2 feet above the normal surface). Inches of replacement may be translated into standard nursery planting sizes using the following formulas:
• 24-inch boxed tree = 3 replacement inches
• 15-gallon tree = 1 replacement inch
• 5-gallon tree = 1/2 replacement inch
Vegetation Replacement
Size (inches)
Native Species (except
Oaks and Elderberry)
Oak
Species
Nonnative
Species
<12 3:1 5:1 1:1
12–24 6:1 7:1 2:1
>24 10:1 12:1 3:1

Page 226 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-83

4.5 CULTURAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?
b. Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
c. Disturb any human remains, including those interred outside of formal cemeteries?

4.5.1 Baseline Conditions
The Project area is located in northeastern Fairfield and extends north into the City of Vacaville within Solano County. The Project includes improvements at the existing North Bay Regional Water Treatment Plant (NBRWTP) and two alternative pipeline alignments extending north toward Vacaville. The Project area consists of developed utility facilities, roadway corridors, annual grasslands, seasonal wetlands, seasonal ponds, and portions of Union Creek. Much of the Project area has been previously disturbed by construction and operation of the NBRWTP, roadway improvements, utility installation, agricultural activities, nearby residential development, and ongoing maintenance; however, undeveloped portions of the Project area retain the potential to contain previously undiscovered archaeological deposits.

4.5.1.1 Cultural Setting
The Project area lies within the ancestral homeland of the Patwin people, a Southern Wintun-speaking group that traditionally occupied much of present-day Solano and Yolo Counties. Prior to Euro-American settlement, Native American populations relied on the region’s abundant natural resources associated with seasonal wetlands, grasslands, and waterways, including Union Creek and nearby tributaries. During the historic period, the area was transformed through agricultural development, irrigation infrastructure, transportation improvements, and urban expansion associated with the Cities of Fairfield and Vacaville. These activities have substantially altered portions of the landscape while leaving the potential for buried archaeological deposits in less disturbed areas.

The Project area is situated on relatively level alluvial deposits associated with the Union Creek drainage and surrounding valley floor. Because repeated flooding and sediment deposition can bury archaeological materials over time, intact prehistoric archaeological deposits may occur beneath the existing ground surface, even in areas where previous disturbance has occurred. Consequently, the absence of visible surface artifacts does not preclude the presence of subsurface archaeological or tribal cultural resources.

4.5.1.2 Known Cultural Resources
Known cultural resources within the Project area include portions of the historic Sacramento Northern Railway, the Putah South Canal, and the historic Peabody Road alignment. In addition, one

Page 227 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -84 isolated precontact Native American bifacial flake tool has been documented within the Project area. The Sacramento Northern Railway is historically significant as a regional transportation corridor; however, the segment within the Project area has been substantially altered and no longer retains sufficient integrity to contribute to the significance of the overall resource. Similarly, the portions of the Putah South Canal and Peabody Road located within the Project area do not represent significant contributing elements of the larger historic resources. The isolated bifacial flake tool represents evidence of prehistoric Native American activity but, as an isolated find, is not considered eligible for listing in the California Register of Historical Resources (CRHR).

Although no known historical resources listed in or eligible for listing in the CRHR have been identified within the Project area, portions of the Project area retain moderate to high sensitivity for previously undiscovered archaeological resources because of their proximity to Union Creek, the presence of alluvial soils capable of preserving buried cultural deposits, and the long history of Native American occupation within the region. Tribal consultation conducted pursuant to Assembly Bill 52 also identified areas of cultural sensitivity within the vicinity of Union Creek, South Putah Creek, and the area near California State Prison, Solano. As a result, ground-disturbing activities in these locations have the potential to encounter previously unidentified archaeological resources or tribal cultural resources. Additional information regarding the cultural setting, records search, Native American outreach, field investigations, resource evaluations, and supporting documentation is provided in the Cultural Resources Report (Appendix C).

4.5.2 Regulatory Requirements

4.5.2.1 Federal Regulations
The National Historic Preservation Act of 1966. The National Historic Preservation Act requires that the federal government list significant historic resources on the National Register of Historic Places (National Register). Federal agencies must consult the National Register when planning to undertake or grant approval through permits for a project. Prior to the issuance of any license or implementation of any project, the federal agency must consider the effects of a project or license on any historical buildings, sites, structures, or objects that are included on, or eligible for inclusion on, the National Register (16 United States Code [USC] Section 470(f)). This typically includes consultation with the federal agency responsible for the undertaking; the State Historic Preservation Officer; local Native American groups and individuals; local and State historical societies and organizations; and relevant archival sources, including the appropriate facility of the California Historical Resources Information System. A cultural resource is evaluated for eligibility for listing in the National Register according to four criteria. These criteria generally require that the resource be 50 years of age or older and significant at the local, State, or national level according to one or more of the following:

A. It is associated with events that have made a significant contribution to the broad patterns of our history;
B. It is associated with the lives of persons significant in our past; C. It embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of a master, or possesses high artistic

Page 228 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-85 values, or that represent a significant and distinguishable entity whose components lack individual distinction; and/or
D. It has yielded, or may be likely to yield, information important to prehistory or history.

Properties that are not 50 years of age or older must have “exceptional significance” in accordance with National Register Criteria Considerations. The National Register also requires that a resource possess integrity, which is defined as “the ability of a property to convey its significance.” The aspects of integrity are location, design, setting, materials, workmanship, feeling, and association.

To determine which of these factors are most important will depend on the particular National Register criterion under which the resource is considered eligible for listing.

The Native American Graves Protection and Repatriation Act. The Native American Graves Protection and Repatriation Act (NAGPRA) (Public Law 101-601; 25 USC 3001-3013) describes the rights of Native American lineal descendants, Indian tribes, and Native Hawaiian organizations with respect to the treatment, repatriation, and disposition of Native American human remains, funerary objects, sacred objects, and objects of cultural patrimony, referred to collectively in the statute as cultural items, with which they can show a relationship of lineal descent or cultural affiliation. It requires that federal agencies and museums receiving federal funds inventory holdings of Native American human remains and funerary objects and provide written summaries of other cultural items. 27

4.5.2.2 State Regulations
State CEQA Guidelines Section 15064.5. Pursuant to Section 15064.5 of the State CEQA Guidelines, the term “historical resource” shall include:
(1) A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources [California Register] (Pub. Res. Code §5024.1, Title 14 California Code of Regulations [CCR], Section 4850 et seq.).
(2) A resource included in a local register of historical resources, as defined in section 5020.1(k) of the Public Resources Code or identified as significant in an historical resource survey meeting the requirements section 5024.1(g) of the Public Resources Code, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.
(3) A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical 27 National Park Service. n.d. The Native American Graves Protection and Repatriation Act (NAGPRA).

Website: https://www.nps.gov/archeology/tools/laws/nagpra.htm (accessed March 30, 2026).

Page 229 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -86 Resources [California Register] (Pub. Res. Code §5024.1, Title 14 California Code of Regulations [CCR], Section 4850 et seq.).
(4) A resource included in a local register of historical resources, as defined in section 5020.1(k) of the Public Resources Code or identified as significant in an historical resource survey meeting the requirements section 5024.1(g) of the Public Resources Code, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.
(5) Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be an historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the California Register of Historical Resources (Pub. Res. Code, § 5024.1, Title 14 CCR, Section 4852) including the following:

A. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

B. Is associated with the lives of persons important in our past.

C. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.

D. Has yielded, or may be likely to yield, information important in prehistory or history.

In addition, Section 15064.5(a)(4) of the State CEQA Guidelines states that the fact that a resource is not listed in, or determined to be eligible for listing in the California Register, not included in a local register of historical resources (pursuant to Public Resources Code [PRC] Section 5020.1(k)), or identified in an historical resources survey (meeting the criteria in PRC Section 5024.1(g)) does not preclude a lead agency from determining that the resource may be an historical resource as defined in PRC Sections 5020.1(j) or 5024.1.

Further, Section 15064.5(b) of the State CEQA Guidelines states that a project with an effect that may cause a substantial adverse change in the significance of an historical resource is a project that may have a significant effect on the environment. A “substantial adverse change” to a historical resource “means demolition, destruction, relocation, or alteration such that the significance of a historical resource would be impaired.”

Page 230 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-87 California Health and Safety Code Section 7050.5. California Health and Safety Code Section 7050.5 states that, in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the Coroner of the county in which the remains are discovered has determined whether or not the remains are subject to the Coroner’s authority. If the human remains are of Native American origin, the Coroner must notify the Native American Heritage Commission (NAHC) within 24 hours of this identification. The NAHC will identify a Native American Most Likely Descendant (MLD) to inspect the site and provide recommendations for the proper treatment of the remains and associated grave goods.

Public Resources Code Section 5097.5. PRC Section 5097.5 provides for the protection of cultural resources and prohibits the removal, destruction, injury, or defacement of archaeological features on any lands under the jurisdiction of State or local authorities.

California Register of Historical Resources (PRC Section 5020 et seq.). State law also protects cultural resources by requiring evaluations of the significance of prehistoric and historic resources in CEQA documents. A cultural resource is an important historical resource if it meets any of the criteria found in State CEQA Guidelines Section 15064.5(a). These criteria are nearly identical to those for the National Register, which are listed above under Section 4.5.2.1, Federal Regulations.

The State Historic Preservation Officer maintains the California Register. Properties listed, or formally designated eligible for listing, on the National Register are nominated to the California Register and then selected to be listed on the California Register, as are State Landmarks and Points of Interest.

The California Register criteria are based on National Register criteria. For a property to be eligible for inclusion in the California Register, one or more of the following criteria must be met:

1. It is associated with the events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States;

2. It is associated with the lives of persons important to local, California, or national history;

3. It embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of a master, or possesses high artistic values; and/or

4. It has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California, or the nation.

In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resource.” Fifty years is used as a general estimate

Page 231 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -88 of time needed to develop the perspective to understand the resource’s significance (California Code of Regulations [CCR] 4852[d][2]).

The California Register also requires that a resource possess integrity, which is defined as “the authenticity of an historical resource’s physical identity evidenced by the survival of characteristics that existed during the resource’s period of significance.” 28 To retain integrity, a resource should have its original location, design, setting, materials, workmanship, feeling, and association. Which of these factors is most important depends on the particular criterion under which the resource is considered eligible for listing. 29

4.5.2.3 Regional/Local Regulations
City of Fairfield General Plan30
• Goal OSCR-5. Protect and preserve Fairfield’s tribal, cultural, and historic resources. ○ Policy OSCR-5.1. Tribal Consultation. Pursuant to requirements of Senate Bill (SB) SB 18 and AB 52, consult with Native American tribes with ancestral ties to the lands within Fairfield city limits prior to new development projects or land use changes. ○ Policy OSCR-5.2. Cultural Resource Review. Prior to submittal of project applications, require project applicant in areas with known archaeological sensitivity to consult with the California Archaeological Inventory Northwest Information Center at Sonoma State University to determine if the project will have an impact on cultural resources. ○ Policy OSCR-5.3. Cultural Resource Impacts. Avoid impacts on cultural resources through the following mechanisms:

Require archeological studies by a qualified archeologist (as defined by the secretary of the Interior’s standards) in areas of archeological significance prior to approval of development projects.

If avoidance is infeasible, require site testing by a qualified archeologist to determine the significance of the resources, and implement recommended mitigation measures.

Halt construction at a development site if cultural resources are encountered unexpectedly during construction and require consultation with a qualified archeologist to determine the significance of the resources.
28 California Office of Historic Preservation (OHP). 1999. California Register and National Register: A Comparison (for purposes of determining eligibility for the California Register), OHP Technical Assistance Series #6. 29 Ibid. 30 City of Fairfield. 2024e. City of Fairfield General Plan, Open Space, Conservation, and Recreation Element. p. 6-29. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/12145/6387184933396 70000 (accessed February 13, 2026).

Page 232 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-89 City of Vacaville General Plan
• Goal COS-6. Protect and enhance cultural resources for their aesthetic, scientific, educational, and cultural values.
○ Policy COS-P6.1. Consult with those Native American Tribes with ancestral ties to the Vacaville city limits regarding proposed new development projects and land use policy changes.
○ Policy COS-P6.2. Require that a records search of the California Historical Resources Information System be conducted and reviewed by a cultural resources professional for proposed development areas to determine whether the site contains known prehistoric or historic cultural resources and the potential for as-yet-undiscovered cultural resources. ○ Policy COS-P6.3. Require that areas found to contain significant historic or prehistoric artifacts be examined by a qualified consulting archaeologist or historian for appropriate protection and preservation.
○ Policy COS-P6.4. Require that if cultural resources, including archaeological or paleontological resources, are uncovered during grading or other on-site excavation activities, construction shall stop until appropriate mitigation is implemented. ○ Policy COS-P6.5. Require that any archaeological or paleontological resources on a development project site be either preserved in their sites or adequately documented as a condition of removal. When a development project has sufficient flexibility, avoidance and preservation of the resource shall be the primary mitigation measure, unless the City identifies superior mitigation. If resources are documented, coordinate with descendants and/or stakeholder groups, as warranted.
○ Policy COS-P6.6. Treat human remains discovered during implementation of public and private projects within the city with respect and dignity.

4.5.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment, which are further described in Section 2.0, Project Description. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Trail Alignment and the Peabody Road Alignment, as appropriate.

Additional information regarding the cultural resources investigations completed for the Project is provided in the Cultural Resources Report (Appendix C).

Page 233 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -90 a. Would the project cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?
Less Than Significant with Mitigation Incorporated. A Cultural Resources Inventory was completed for the Project to identify historical resources that could be affected by implementation of the Project (Appendix C). The investigation included a records search, Native American outreach, and an intensive Class III pedestrian survey. The inventory identified three historic-era resources within the Project area, including portions of the Sacramento Northern Railway, the Putah South Canal, and the historic Peabody Road alignment. Each of these resources was evaluated for eligibility for listing in the California Register of Historical Resources (CRHR), and the portions located within the Project area were determined to be ineligible because they do not retain sufficient integrity or do not represent significant contributing elements of the larger historic resources. Therefore, no known historical resources, as defined by CEQA Guidelines Section 15064.5, would be directly affected by construction of the NBRWTP improvements or either pipeline alignment.

Although no known historical resources eligible for listing in the CRHR occur within the Project area, ground-disturbing activities associated with construction of the NBRWTP improvements and either pipeline alignment have the potential to encounter previously unidentified historical resources buried beneath the existing ground surface. Implementation of Mitigation Measures CUL-1 through CUL-4, including archaeological monitoring in sensitive areas, procedures for the treatment of unanticipated discoveries, and compliance with applicable State requirements, would avoid or reduce potential impacts to historical resources. With implementation of Mitigation Measures CUL-1 through CUL-4, impacts to historical resources would be less than significant. b. Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
Less Than Significant with Mitigation Incorporated. Although no significant archaeological resources were identified within the Project area during the cultural resources investigation, one isolated precontact Native American bifacial flake tool was documented, indicating prehistoric use of the area. The isolated artifact is not considered a unique archaeological resource or eligible for listing in the CRHR. However, portions of the Project area, particularly those associated with Union Creek, alluvial deposits, and areas identified during tribal consultation, retain the potential to contain previously undiscovered subsurface archaeological resources.

Construction of the NBRWTP improvements and either pipeline alignment would require excavation, trenching, grading, and other ground-disturbing activities that could disturb previously unidentified archaeological deposits if present. This potential exists for both pipeline alignments because each includes excavation in previously disturbed as well as less disturbed areas, although the specific locations of disturbance differ. As documented in Appendix C, archaeological monitoring is recommended in sensitive portions of the Project area, including the vicinity of the isolated artifact and areas identified through tribal consultation.

Implementation of Mitigation Measures CUL-1 through CUL-4, including archaeological monitoring, procedures for evaluating and treating any archaeological resources encountered during

Page 234 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-91 construction, and avoidance or appropriate treatment of significant discoveries, would reduce potential impacts to archaeological resources to a less than significant level. c. Would the project disturb any humans remains, including those interred outside of formal cemeteries?
Less Than Significant with Mitigation Incorporated. No known cemeteries, formal burial grounds, or recorded human remains are located within the Project area. However, because the Project includes excavation associated with the NBRWTP improvements and either pipeline alignment, there remains the possibility that previously undiscovered human remains could be encountered during ground-disturbing activities.

If human remains are encountered during construction, work in the vicinity of the discovery would cease immediately, and the remains would be treated in accordance with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98. The County Coroner would determine whether the remains are of Native American origin, and if so, the Native American Heritage Commission would designate the Most Likely Descendant to provide recommendations regarding appropriate treatment of the remains.

Implementation of Mitigation Measure CUL-5, including procedures for the treatment of unanticipated discoveries and human remains, would ensure compliance with applicable State laws and reduce impacts to human remains to a less than significant level.

4.5.4 Mitigation Measures
Mitigation Measure CUL-1 Worker Environmental Awareness Training. Prior to commencement of ground-disturbing activities, the Applicant shall retain a Secretary of the Interior-qualified archaeologist to provide Worker Environmental Awareness Program (WEAP) training to all construction personnel, including contractors and subcontractors.

The training shall describe the types of archaeological, historical, and tribal cultural resources that may be encountered, applicable legal protections, procedures to be followed if cultural resources are discovered, and the prohibition against collecting artifacts.

Additional training information shall be provided to all personnel who join the Project after the initial training.

Mitigation Measure CUL-2 Tribal Monitoring and Coordination. Prior to issuance of grading permits, the City shall continue consultation with culturally affiliated California Native American tribes, as appropriate, and execute a Tribal Monitoring Agreement, as requested by the consulting tribe.

Tribal monitoring shall be conducted during ground-disturbing activities within culturally sensitive areas identified during Assembly Bill 52 consultation, including the vicinity of Union Creek, South Putah Creek, and the area near California State Prison, Solano, or other locations identified through consultation. The tribal monitor

Page 235 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -92 shall coordinate with the Project archaeologist throughout construction.

Mitigation Measure CUL-3 Archaeological Monitoring. A Secretary of the Interior-qualified archaeologist shall monitor ground-disturbing activities within archaeologically sensitive areas identified in Cultural Resources Report (Appendix C), including the vicinity of archaeological isolate WY-ISO-01 and site P-48-000199. Monitoring shall continue until the Project archaeologist determines that excavation has reached previously disturbed or culturally sterile soils or that the potential for encountering buried cultural resources has been substantially reduced. Monitoring frequency may be reduced, with concurrence of the Project archaeologist, based on observed field conditions. If archaeological resources are encountered, work shall cease in the vicinity of the discovery until the resource has been evaluated and appropriate treatment measures are implemented.

Mitigation Measure CUL-4 Unanticipated Discovery of Cultural Resources. If archaeological materials or other cultural resources are encountered during construction, all ground-disturbing activities within at least 100 feet of the discovery, or another distance determined appropriate by the project archaeologist, shall cease immediately. The discovery shall be evaluated by a Secretary of the Interior-qualified archaeologist, in consultation with the tribal monitor, as appropriate, to determine whether the resource qualifies as a historical resource, unique archaeological resource, or tribal cultural resource pursuant to CEQA. If the resource is determined to be significant, it shall be avoided where feasible. If avoidance is not feasible, appropriate treatment measures, including data recovery, documentation, curation, or other measures developed in consultation with the City and affiliated tribes, shall be implemented before construction resumes.

Mitigation Measure CUL-5 Discovery of Human Remains. If human remains are encountered during construction, all work within the vicinity of the discovery shall cease immediately. The Solano County Coroner shall be notified in accordance with California Health and Safety Code Section 7050.5. If the Coroner determines the remains are of Native American origin, the Coroner shall notify the Native American Heritage Commission, which shall designate a Most Likely Descendant pursuant to Public Resources Code Section 5097.98.

The Applicant shall comply with the recommendations of the Most Likely Descendant, as appropriate, and all applicable State laws governing the treatment and disposition of human remains before construction resumes.

Page 236 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-93

4.6 ENERGY
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation? b. Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?

4.6.1 Baseline Conditions
The existing North Bay Regional Water Treatment Plant (NBRWTP) is an operational utility facility that consumes electricity and fuel to support water treatment, pumping, and distribution activities.

The facility’s energy demand includes electricity for pumps, treatment processes, lighting, and administrative operations, as well as fuel for standby generators and maintenance vehicles. Energy is supplied primarily through the regional electrical grid managed by Pacific Gas and Electric Company (PG&E), with natural gas available for backup or support systems where applicable. The existing baseline condition reflects typical energy use associated with an industrial-scale water treatment facility in an urban-industrial context, including ongoing electricity and fuel consumption necessary to maintain continuous potable water delivery to Fairfield and surrounding service areas.

Energy efficiency measures, such as high-efficiency pumps and lighting, are consistent with California energy standards and local regulations.

4.6.2 Regulatory Requirements

4.6.2.1 Federal Regulations
National Energy Conservation Policy Act. The National Energy Conservation Policy Act of 1978 is a United States statute that was enacted as part of the National Energy Act, designed to reduce energy demand, conserve nonrenewable resources, and promote efficiency in buildings, industry, and transportation, by directing utilities, states, and the federal government to create programs for residential and commercial energy conservation. Key provisions included utility-run programs for homeowners, federal building efficiency standards (like metering), and establishing frameworks for appliance efficiency.

Energy Policy Act of 2005. The Energy Policy Act of 2005 seeks to reduce reliance on nonrenewable energy resources and provides incentives to reduce current demand on these resources. For example, under this act, consumers and businesses can obtain federal tax credits for purchasing fuel-efficient appliances and products (including hybrid vehicles), building energy-efficient buildings, and improving the energy efficiency of commercial buildings. Additionally, tax credits are available for the installation of qualified fuel cells, stationary microturbine power plants, and solar power equipment.

Page 237 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -94 Corporate Average Fuel Economy Standards. On March 31, 2022, the National Highway Traffic Safety Administration finalized the Corporate Average Fuel Economy (CAFE) standards for Model Years 2024–2026 Passenger Cars and Light Trucks. The amended CAFE standards would require an industry-wide fleet average of approximately 49 miles per gallon for passenger cars and light trucks in model year 2026, by increasing fuel efficiency by 8 percent annually for model years 2024–2025, and 10 percent annually for model year 2026. The final standards are estimated to save about 234 billion gallons of gasoline between model years 2030 to 2050.

4.6.2.2 State Regulations
Assembly Bill 1575, Warren-Alquist Act. In 1975, largely in response to the oil crisis of the 1970s, the State Legislature adopted AB 1575 (also known as the Warren-Alquist Act), which created the California Energy Commission (CEC). The statutory mission of the CEC is to forecast future energy needs; license power plants with outputs of 50 megawatts or larger; develop energy technologies and renewable energy resources; plan for and direct State responses to energy emergencies; and, perhaps most importantly, promote energy efficiency through the adoption and enforcement of appliances and building energy efficiency standards. AB 1575 also amended Public Resources Code (PRC) Section 21100(b)(3) and State CEQA Guidelines Section 15126.4 to require Environmental Impact Reports (EIRs) to include, where relevant, mitigation measures proposed to minimize the wasteful, inefficient, and unnecessary consumption of energy caused by a project. Thereafter, the State Resources Agency created Appendix F to the State CEQA Guidelines. Appendix F assists EIR preparers in determining whether a project will result in inefficient, wasteful, and unnecessary consumption of energy. Appendix F of the State CEQA Guidelines also states that the goal of conserving energy implies the wise and efficient use of energy and the means of achieving this goal, including (1) decreasing overall per capita energy consumption; (2) decreasing reliance on fossil fuels such as coal, natural gas, and oil; and (3) increasing reliance on renewable energy sources.

Senate Bill 1389, Energy: Planning and Forecasting. In 2002, the State Legislature passed Senate Bill (SB) 1389, which required the CEC to develop an integrated energy plan every 2 years for electricity, natural gas, and transportation fuels for the California Energy Policy Report. The plan calls for the State to assist in the transformation of the transportation system to improve air quality, reduce congestion, and increase the efficient use of fuel supplies with the least environmental and energy costs. To further this policy, the plan identifies a number of strategies, including assistance to public agencies and fleet operators in implementing incentive programs for zero-emission vehicles and their infrastructure needs, and encouragement of urban designs that reduce vehicle miles traveled and accommodate pedestrian and bicycle access.

In compliance with the requirements of SB 1389, the CEC adopts an Integrated Energy Policy Report every 2 years and an update every other year. The most recently adopted report includes the 2024 Integrated Energy Policy Report Update.
31 The 2024 Integrated Energy Policy Report Update covers a broad range of topics, including decarbonizing buildings, integrating renewables, energy efficiency, energy equity, integrating renewable energy, updates on electricity reliability, climate adaptation activities for the energy sector, natural gas assessment, transportation energy demand forecast, and 31 California Energy Commission (CEC). 2024. 2024 Integrated Energy Policy Report Update. Docket Number 24-IEPR-01.

Page 238 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-95 the California Energy Demand Forecast. The 2024 Integrated Energy Policy Report Update provides the results of the CEC’s assessments of a variety of energy issues facing California. Many of these issues will require action if the State is to meet its climate, energy, air quality, and other environmental goals while maintaining energy reliability and controlling costs.

Renewable Portfolio Standard. SB 1078 established the California Renewable Portfolio Standards program in 2002. SB 1078 initially required that 20 percent of electricity retail sales be served by renewable resources by 2017; however, this standard has become more stringent over time. In 2006, SB 107 accelerated the standard by requiring that the 20 percent mandate be met by 2010. In April 2011, SB 2 required that 33 percent of electricity retail sales be served by renewable resources by 2020. In 2015, SB 350 established tiered increases to the Renewable Portfolio Standards of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. In 2018, SB 100 increased the requirement to 60 percent by 2030 and required that all the State’s electricity come from carbon-free resources by 2045. SB 100 took effect on January 1, 2019. 32 California Energy Code/Title 24. Energy consumption by new buildings in California is regulated by the Building Energy Efficiency Standards in Part 6 of Title 24 of the California Code of Regulations (CCR), known as the Energy Code. The CEC first adopted the Building Energy Efficiency Standards for Residential and Non-residential Buildings in 1978 in response to a legislative mandate to reduce energy consumption in the State. The Energy Code is updated every 3 years, with the most recent update consisting of the 2022 Energy Code that became effective January 1, 2023. Mid-cycle supplements to the 2022 Code became effective on July 1, 2024. The efficiency standards apply to both new construction and rehabilitation of both residential and nonresidential buildings, and regulate energy consumed for heating, cooling, ventilation, water heating, and lighting. The building efficiency standards are enforced through the local building permit process. Local government agencies may adopt and enforce energy standards for new buildings, provided these standards meet or exceed those provided in the Energy Code.

California Green Building Standards Code. In 2010, the California Building Standards Commission adopted Part 11 of the Title 24 Building Energy Efficiency Standards, referred to as the California Green Building Standards Code (CALGreen Code). The CALGreen Code took effect on January 1, 2011. The CALGreen Code is updated on a regular basis, with the most recent update consisting of the 2022 CALGreen Code standards that became effective January 1, 2023. The CALGreen Code established mandatory measures for residential and nonresidential building construction and encouraged sustainable construction practices in the following five categories: (1) planning and design, (2) energy efficiency, (3) water efficiency and conservation, (4) material conservation and resource efficiency, and (5) indoor environmental quality. Although the CALGreen Code was adopted as part of the State’s efforts to reduce GHG emissions, the CALGreen Code standards have co-benefits of reducing energy consumption from residential and nonresidential buildings subject to the standard.

California Energy Efficiency Strategic Plan. On September 18, 2008, the California Public Utilities Commission (CPUC) adopted California’s first Long-Term Energy Efficiency Strategic Plan, presenting 32 California Public Utilities Commission (CPUC). 2019. Renewables Portfolio Standard Program. Website:
cpuc.ca.gov/rps (accessed September 2025).

Page 239 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -96 a roadmap for energy efficiency in California. The Strategic Plan was updated in 2011. The plan articulates a long-term vision and goals for each economic sector and identifies specific near-term, mid-term, and long-term strategies to assist in achieving those goals. The Plan also reiterates the following four specific programmatic goals known as the “Big Bold Energy Efficiency Strategies” that were established by the CPUC in Decisions D.07-10-032 and D.07-12-051:
• All new residential construction will be zero net energy (ZNE) by 2020. • All new commercial construction will be ZNE by 2030.
• 50 percent of commercial buildings will be retrofitted to ZNE by 2030. • 50 percent of new major renovations of State buildings will be ZNE by 2025.

California Energy Plan. California’s Energy Plan is a comprehensive strategy led by the CEC, aiming for 100 percent clean electricity by 2045, focusing on massive renewable energy build-out, grid modernization, electrification of transport and buildings, and decarbonization across all sectors, supported by targets such as the California Renewables Portfolio Standard and initiatives for energy efficiency and equity.

State Alternative Fuels Plan. The CEC, in partnership with the California Air Resources Board, prepared the State Alternative Fuels Plan as required by Assembly Bill 1007. The Final Commission Report was adopted on December 5, 2007. The State Alternative Fuels Plan funds development of low-carbon fuels (hydrogen, electric, renewable diesel) and charging/refueling infrastructure, incentivizes advanced vehicles (Zero-Emission Vehicles, Fuel Cell Electric Vehicles), supports workforce training, and mandates cleaner state fleet use, aiming to reduce fossil fuel reliance and meet climate goals through programs like the Low Carbon Fuel Standard.

4.6.2.3 Regional/Local Regulations
City of Fairfield General Plan33
• Goal SUS-5. Coordinate with partners and the public to reduce energy consumption and promote energy conservation.
○ Policy SUS-5.1. Electricity Provider Conservation Efforts. Support efforts that increase energy conservation in all households and businesses.
• Goal SUS-6. Support the development of a robust, reliable, and resilient energy system by transitioning from fossil fuels to renewable sources.
○ Policy SUS-6.2. Minimizing Dependence on Natural Gas. Subject to further financial evaluation and community feedback, establish minimum sustainable energy requirements for municipal and private development that may result in a transition to electric building 33 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 240 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-97 systems and appliances in both new constructions and existing structures currently reliant on natural gas, to the extent permissible by law.
○ Policy SUS-6.3. Overcoming Regulatory Hurdles. Continue efforts to remove regulatory obstacles and introduce incentives to promote solar energy adoption, including rooftop solar installations and parking lot canopies. Encourage and expedite the deployment of renewable energy systems aligned with the objectives outlined in the Climate Action Plan.

City of Vacaville General Plan34
• Policy COS-P11.1. Require that new development incorporate energy-efficient design features for HVAC, lighting systems, and insulation that exceed Title 24. • Policy COS-P11.2. Require that site and structure designs for new development promote energy efficiency.

4.6.3 Impact Analysis
The upgrades to the existing North Bay Regional Water Treatment Plant (NBRWTP) along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment, which are further described in Chapter 2.0, Project Description. Both alignments would involve installation of similarly sized underground transmission infrastructure and would require comparable construction methods, equipment usage, operational pumping demands, maintenance activities, and supporting utility infrastructure. Although the alignments traverse different corridors and may differ in overall length by 400 feet, both would result in generally similar energy demands associated with construction, operation, and long-term maintenance. Therefore, both alignments are presumed to have similar impacts to energy and are analyzed together in this section. a. Would the project result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation?
Less Than Significant Impact. The Project involves expansion and upgrades of the existing NBRWTP, including installation of new treatment units, pipeline improvements within existing rights-of-way, and associated operational facilities. Construction activities would temporarily increase energy consumption for machinery, vehicles, and material transport; however, these demands are short-term, temporary, and consistent with typical utility construction projects. Best management practices for construction, such as fuel-efficient construction equipment, optimized construction schedules, and idling reduction measures, would minimize unnecessary energy use.

During operation, the NBRWTP expansion is expected to include upgrades to improve energy efficiency, including high-efficiency pumps, motors, and process controls, and LED lighting or 34 City of Vacaville. 2015. Vacaville General Plan. Website: https://www.cityofvacaville.gov/home/ showpublisheddocument/14102/637045896849400000 (accessed June 2026).

Page 241 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -98 building efficiency measures consistent with California Energy Code (Title 24). The proposed improvements are intended to optimize energy consumption per unit of water treated, ensuring that overall energy consumption is efficient.

Because the Project incorporates energy-efficient design and operational upgrades, complies with applicable State and local energy standards, and any incremental increase in energy use is proportional to the expanded capacity, the Project would not result in wasteful, inefficient, or unnecessary energy consumption and impacts would be less than significant. b. Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? No Impact. The Project would comply with State and local energy policies, including the California Energy Code (Title 24), the California Renewables Portfolio Standard, and PG&E energy efficiency and demand-side management programs. Energy-efficiency measures incorporated in the Project expansion design would align with State and local renewable energy and efficiency goals.

The Project does not preclude or obstruct implementation of renewable energy programs, nor would it interfere with existing or planned initiatives to reduce energy demand. Any on-site backup generation would comply with applicable air quality and energy regulations. Therefore, the Project would be consistent with local and State plans aimed at energy conservation and renewable energy deployment. Therefore, there will be no impacts that conflict or obstruct renewable energy or energy efficiency plans as a result of Project implementation.

4.6.4 Mitigation Measures
No mitigation measures are warranted.

Page 242 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-99

4.7 GEOLOGY AND SOILS
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning
Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure, including liquefaction? iv. Landslides?
b. Result in substantial soil erosion or the loss of topsoil? c. Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
d. Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property?
e. Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water?
f. Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?

4.7.1 Baseline Conditions

4.7.1.1 Earthquake Faults
The Project is in Solano County within the seismically active Northern California region. Although the site is not directly on a mapped active fault, it is within a broader area influenced by regional faults, including the Hayward, Concord–Green Valley, and Calaveras fault zones. The California Geological Survey (CGS) and the Alquist-Priolo Earthquake Fault Zones do not indicate any active faults crossing the Project parcel. 35 Therefore, the baseline condition reflects a site that is not directly traversed by active earthquake faults, though it remains subject to regional seismic hazard as typical for the northern Bay Area.

4.7.1.2 Seismic Ground Shaking
The Project is in a region subject to moderate to strong seismic ground shaking due to its proximity to multiple active faults in the San Francisco Bay Area. Past seismic events in Solano County and adjacent counties indicate that ground shaking could occur during a regional earthquake, but the 35 DOC California Geological Survey (CGS). 2021. Earthquake Zones of Required Investigation. Website:
https://maps.conservation.ca.gov/cgs/EQZApp/app/ (accessed July 2, 2024).

Page 243 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -100 existing facility has been constructed in accordance with California Building Code (CBC) seismic design standards for public utility structures. The baseline condition, therefore, reflects existing infrastructure that has been constructed to withstand seismic activity.

4.7.1.3 Liquefaction
According to the California Geological Survey and County of Solano seismic hazard mapping, portions of Fairfield, including low-lying areas with sandy soils or artificial fill, are susceptible to liquefaction during significant seismic events. The Project, situated on gently sloping San Ysidro sandy loam soils, does not include deep, loose, saturated sands typical of high liquefaction risk areas, although localized zones of loose near-surface soils may exist. Existing site infrastructure has been constructed on compacted soils with foundations designed to minimize settlement and liquefaction-related impacts. The baseline condition reflects a moderate liquefaction susceptibility typical of low-lying soils in the region, with existing engineering measures in place to manage risk.

4.7.1.4 Landslides
The Project and surrounding area are characterized by very low slopes (0–2%) and stable topography. Soil mapping and regional geomorphology indicate that landslides are unlikely at the site. No mapped landslide-prone zones or historical landslide events are documented within the facility boundaries or immediate vicinity. The baseline condition, therefore, reflects an essentially stable terrain with negligible landslide hazard under existing conditions.

4.7.1.5 Soils
The Project is on relatively flat terrain on the eastern periphery of Fairfield, Solano County, within an area characterized by low relief and gentle slopes. Based on the Natural Resources Conservation Service soil survey data for Solano County, the Project site consists predominantly of San Ysidro sandy loam (SeA and SeB, 46.3 percent and 1.5 percent), supporting shallow, well-drained soils with moderate permeability. Smaller areas of Antioch-San Ysidro complex (AoA and AsA, 0.2 and 7.6 percent of the Project site) are present with 0 to 2 percent slopes and moderately deep, well-drained soils, while Capay silty clay loam (Ca, 18.3 percent), Diablo-Ayar clays (DaC and DaE2, 9.3 and 18.9 percent) are present in localized pockets and along both the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. Approximately 0.1 percent of the Project site and Linear Trail Pipeline Alignment area is classified as water (W), reflecting existing ponds or surface water features. In addition, the Peabody Road Pipeline Alignment area consists of Brentwood Clay Loam (BrC, 2.0 percent) and Rincon clay loam (RoA, 0.9 percent), well-drained soils with moderately low to moderately high permeability. These soils are generally suitable for the development and operation of utility infrastructure without the need for extensive soil modification. The baseline condition therefore reflects a stable, predominantly sandy loam soil profile with minor clay inclusions, generally low slopes, and suitability for industrial-scale utility development, consistent with the current water treatment facility operations.

4.7.1.6 Paleontological Resources
The Project is on the eastern periphery of Fairfield within the Suisun Valley region of Solano County, an area underlain by Quaternary-age alluvial deposits derived from the surrounding Coast Ranges.

These unconsolidated alluvial soils—composed primarily of sand, silt, clay, and gravel—were

Page 244 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-101 deposited relatively recently in geologic time and are generally considered to have a low paleontological sensitivity near the surface because they are too young to contain significant fossil material. However, older Pleistocene-age deposits may occur at greater depths beneath the surficial soils and have the potential to contain scientifically important vertebrate fossils, including remains of extinct mammals commonly found in the region’s older alluvial formations.

The Project area has been previously disturbed by the construction and operation of the existing North Bay Regional Water Treatment Plant and associated infrastructure, which has substantially altered surface soils and reduced the likelihood of encountering undisturbed paleontological resources. No known fossil localities have been recorded within the Project or its immediate vicinity according to available regional databases maintained by the University of California Museum of Paleontology and the California Geological Survey. The baseline condition therefore reflects a setting of low to moderate paleontological resource sensitivity, with low sensitivity in disturbed surficial soils and moderate potential for fossil-bearing deposits at depth within undisturbed older alluvial materials.

4.7.2 Regulatory Requirements

4.7.2.1 Federal Regulations
Earthquake Hazards Reduction Act. The Earthquake Hazards Reduction Act was enacted in 1997 to “reduce the risks to life and property from future earthquakes in the United States through the establishment and maintenance of an effective earthquake hazards and reduction program.” To accomplish this, the act established the National Earthquake Hazards Reduction Program (NEHRP).

This program was significantly amended in November 1990 by the National Earthquake Hazards Reduction Program Act (NEHRPA), which refined the description of agency responsibilities, program goals, and objectives.

NEHRP’s mission includes improved understanding, characterization, and prediction of hazards and vulnerabilities; improvement of building codes and land use practices; risk reduction through post-earthquake investigations and education; development and improvement of design and construction techniques; improvement of mitigation capacity; and accelerated application of research results. The NEHRPA designates the Federal Emergency Management Agency as the lead agency of the program and assigns it several planning, coordinating, and reporting responsibilities.

4.7.2.2 State Regulations
Alquist‐Priolo Earthquake Fault Zoning Act (1972). The major State legislation regarding earthquake fault zones is the Alquist-Priolo Earthquake Fault Zoning Act (A-P Act), which was passed in 1972.

Following passage of the A-P Act, the State of California began delineating “Earthquake Fault Zones” (called Special Studies Zones prior to 1994) around and along faults that are “sufficiently active” and “well defined” to reduce fault-rupture risks to structures for human occupancy. 36 The boundary of an “Earthquake Fault Zone” is generally 500 feet from major active faults and from 200 to 300 feet from well-defined minor faults. The mapping of active faults is conducted by the State Geologist, 36 California Public Resources Code Sections 2621–2630.

Page 245 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -102 and these maps are distributed to all affected cities, counties, and State agencies for their use in developing planning policies and controlling renovation or new construction.

Before a project can be permitted within an identified Earthquake Fault Zone, cities and counties must require a geologic investigation to demonstrate that proposed buildings will not be constructed across active faults. A site-specific evaluation and written report must be prepared by a licensed geologist. If an active fault is identified, a structure intended for human occupancy cannot be placed over the trace of the fault and must be set back from the fault a minimum of 50 feet.

The A-P Act only addresses the hazard of surface fault rupture and is not directed toward other earthquake hazards.

Seismic Hazard Mapping Act (1990). The State adopted the Seismic Hazard Mapping Act in 1990 to address the potential hazards posed by secondary effects of seismic activity, including strong ground shaking, soil liquefaction, and associated ground failure and seismically induced landslides. The CGS prepares and provides local governments with seismic hazard zone maps that identify areas susceptible to amplified shaking, liquefaction, earthquake‐induced landslides, and other ground failures. The seismic hazard zones are referred to as “zones of required investigation” because site‐ specific geological investigations are required for construction projects within these areas. Before a project can be permitted, a geologic investigation, evaluation, and written report must be prepared by a licensed geologist to demonstrate that the potential hazards can be successfully mitigated.

Natural Hazards Disclosure Act. Effective June 1, 1998, the Natural Hazards Disclosure Act requires that sellers of real property and their agents provide prospective buyers with a “Natural Hazard Disclosure Statement” when the property being sold lies within one or more State-mapped hazard areas. If a property is in a Seismic Hazard Zone as shown on a map issued by the State Geologist, the seller or the seller’s agent must disclose this fact to potential buyers.

California Building Code. Current law states that every local agency enforcing building regulations, such as cities and counties, must adopt the provisions of the California Building Code (CBC) within 180 days of its publication. The publication date of the CBC is established by the California Building Standards Commission, and the code is also known as Title 24, Part 2, of the CCR. Local jurisdictions often adopt local, more restrictive amendments that are based on local geographic, topographic, or climatic conditions. These codes provide minimum standards to protect property and public safety by regulating the design and construction of excavations, foundations, building frames, retaining walls, and other building elements to mitigate the effects of seismic shaking and adverse soil conditions. The CBC contains provisions for earthquake safety based on factors including occupancy type, the types of soil and rock on-site, and the strength of ground shaking with a specified probability at a site. The 2025 CBC took effect on January 1, 2026.

Requirements for Geotechnical Investigations. Requirements for geotechnical investigations for subdivisions requiring tentative and final maps and for other types of structures are provided in California Health and Safety Code, Sections 17953 through 17955, and in Section 1802 of the CBC.

Testing of samples from subsurface investigations is required, such as from borings or test pits.

Studies must be done as needed to evaluate slope stability, soil strength, position and adequacy of

Page 246 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-103 load-bearing soils, the effect of moisture variation on load-bearing capacity, compressibility, liquefaction, differential settlement, and expansiveness.

California Public Resources Code Section 5097.5. Section 5097.5 of the Public Resources Code (PRC) provides for the protection of cultural and paleontological resources and prohibits the removal, destruction, injury, or defacement of archaeological and paleontological features on any lands under the jurisdiction of State or local authorities.

4.7.2.3 Regional/State Regulations
City of Fairfield General Plan. 37
• Goal HS-1: Protect people and property from earthquakes and other geologic hazards. ○ Policy HS-1.1 Seismic Hazard Zones. Require new development to be sited and designed to minimize risks from seismic events. Buildings for hu-man occupancy shall avoid surface traces of active faults and com-ply with the latest seismic and geologic safety structural standards, consistent with the Alquist-Priolo Earthquake Fault Zone Act and other relevant State laws.
○ Policy HS-1.2 Building Standards. Continue to maintain and enforce appropriate building standards, such as the California Building Code, to ensure new development is designed to meet current safety standards associated with seismic activity. ○ Policy HS-1.3 Geologic Studies. Require detailed geologic studies prior to issuance of building permits by a Registered Geologist, Certified Engineering Geologist, and/or Geotechnical Engineer for projects within areas of:
i. Potential seismic activity, including earthquake hazard zones shown in Figure 8-1, 8- 2, and 8-3. Studies prepared shall identify the location of all surface fault traces within 100 feet of any proposed structure and determine their relative activity; ii. Landslide potential;
iii. Liquefaction;
iv. Soils with high shrink/swell potential, or unstable soils; and v. Slope grades in excess of 20 percent.
○ Policy HS-1.4 Erosion Control. Require an erosion control and rehabilitation plan to be prepared for projects requiring substantial groundbreaking activities to control short-term and long-term erosion and sedimentation in nearby streams and rivers. 37 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 247 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -104 ○ Policy HS-1.7 Protect Water Infrastructure from Seismic Activity. Reinforce local direct-fed water systems, tanks, pumps and storage tanks that could potentially be damaged by seismic activity through various protection activities. ○ Policy LU-6.5 Environmental Constraints in Site Design. Ensure that development is reflective of the area’s environmental constraints—including localized presence of geologic faults, slopes/unstable soils, flood hazards—as well as natural resources. Consider incorporating geologic faults/Alquist Priolo Zones as part of the open space or trails system ○ Policy OSCR-4.7 Erosion Control. Manage erosion in the Planning Area, particularly in watershed areas, through on-site erosion control.

City of Vacaville General Plan.
• Goal SAF-1: Minimize exposure to geologic hazards, including slope instability, subsidence, and expansive soils, and to seismic hazards, including ground shaking, fault rupture, liquefaction, and landslides.
○ Policy SAF-P1.6: Require preparation of a soils report prior to issuing a building permit, except where the Building Official determines that a report is not needed.

City of Fairfield Municipal Code.
• Chapter 5, Article 1 of the City of Fairfield Municipal Code adopts the 2025 California Building Standards Code (CBC) in its entirety, subject to the definitions, clarifications, and amendments set forth in the chapter. The CBC regulates seismic design, the excavation of foundations and retaining walls, analysis of slope instability, requirements for drainage and grading, and other aspects of building design and construction that relate to geology, soils, and seismicity.

Amendments to the CBC in the Municipal Code pertaining to geology and soils require that demolition prevents silt and dust from entering the storm drain system.

City of Vacaville Municipal Code.
• Title 15 of the City of Vacaville Municipal Code adopts the 2025 CBC in its entirety, subject to the definitions, clarifications, and amendments set forth in the chapter.

4.7.3 Impact Analysis
The upgrades to the existing North Bay Regional Water Treatment Plant (NBRWTP) along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way within the same or similar geologic conditions. Therefore, both alignments are presumed to have similar impacts to geology and soils and are analyzed together in this section.

Page 248 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-105 a. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.

No Impact. Fault rupture is generally expected to occur along active fault traces that have exhibited signs of recent geological movement (i.e., within the last 11,000 years). Alquist-Priolo Earthquake Fault Zones delineate areas around active faults with potential surface fault rupture hazards that would require specific geological investigations prior to approval of certain kinds of development within the delineated area. There are no mapped faults within or adjacent to the Project site or either pipeline alignment, and the Project and pipeline alignments are not within an Alquist-Priolo Zone. 38 The nearest mapped fault to the Project site is the San Cordelia fault, which is approximately 10 miles west of the Project. Therefore, the Project would not result in potential adverse effects, including the risk of loss, injury, or death involving the rupture of a known earthquake fault as delineated on the most recent Alquist-Priolo Earthquake Fault Zone Map. No impact would occur. ii. Strong seismic ground shaking?
Less Than Significant with Mitigation Incorporated. As discussed above, the Project is in a seismically active area, where earthquakes have the potential to subject the Project to strong seismic ground shaking. The intensity of ground shaking would depend on the characteristics of the fault, distance from the fault, the earthquake magnitude and duration, and site-specific geologic conditions.

The City requires projects to comply with the most recent building code, which is currently the 2025 California Building Standards Code (CBSC) (Title 24, CCR), 39 which provides for stringent construction requirements for projects in areas of high seismic risk based on numerous inter-related factors. It is acknowledged that seismic hazards cannot be completely eliminated, even with implementation of advanced building practices. However, the seismic design standards of the CBSC are intended to prevent catastrophic structural failure in the most severe earthquakes currently anticipated.

Additionally, implementation of Mitigation Measure GEO‐1, which requires the Project applicant to complete a design-level geotechnical investigation once site development plans are final and incorporate all recommendations into the Project development plans, would reduce the potential impacts related to strong seismic ground shaking to a less than significant level with mitigation. iii. Seismic-related ground failure, including liquefaction? Less Than Significant with Mitigation Incorporated. Soil liquefaction is a phenomenon primarily associated with saturated soil layers located close to the ground surface. During ground shaking, 38 California Department of Conservation. 2021. Earthquake Zones of Required Investigation. California Geologic Survey. Website: https://maps.conservation.ca.gov/cgs/EQZApp/app/ (accessed April 29, 2026). 39 City of Fairfield. n.d. Municipal Code, Chapter 5 City of Fairfield Building and Housing Code.

Page 249 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -106 these soils lose strength and acquire “mobility” sufficient to permit both horizontal and vertical movements. The significant factors on which liquefaction potential of a soil deposit depends include soil type, relative soil density, intensity of earthquake, duration of ground shaking, and depth of ground water. Soils that are most susceptible to liquefaction are clean, loose, uniformly graded, saturated, fine-grained sands that lie relatively close to the ground surface. However, loose sands that contain a significant amount of fines (i.e., silt and clay) may also liquefy.

As discussed above in Section 4.7.1.3, the Project site and pipeline alignments are on gently sloping San Ysidro sandy loam soils and does not include deep, loose, saturated sands typical of high liquefaction risk areas, although localized zones of loose near-surface soils may exist.

Implementation of Mitigation Measure GEO‐1, which requires the Project applicant to complete a design-level geotechnical investigation once site development plans are final and incorporate all recommendations into the Project development plans, would reduce the potential impacts related to liquefaction to a less than significant level with mitigation. iv. Landslides?
No Impact. A landslide generally occurs on relatively steep slopes and/or on slopes underlain by weak materials. The Project is primarily flat and is not located next to any slopes. Additionally, the Project is not located within a designated Earthquake Induced Landslide Zone. 40 Therefore, the Project would not result in potential adverse effects, including the risk of loss, injury, or death involving landslides. No impact would occur.
b. Would the project result in substantial soil erosion or the loss of topsoil? Less Than Significant Impact. Topsoil is defined as the upper part of the soil profile that is relatively rich in humus and is technically known as the A-horizon of the soil profile. 41 Grading and earthmoving during Project construction has the potential to result in erosion and the loss of topsoil. Exposed soils could be entrained in stormwater runoff and transported off the Project site.

To address the potential for erosion, the Project would be required to implement a Storm Water Pollution Prevention Plan (SWPPP), including BMPs during construction, which would reduce erosion in accordance with the requirements of the Construction General Permit as detailed in Section 4.10, Hydrology and Water Quality.

Operation of the Project would increase impervious surface area on the Project compared to existing conditions, which are not subject to erosion. Furthermore, the Project would be required to implement a Project-specific Stormwater Control Plan, which would contain post-construction measures to reduce potential impacts to soil erosion to less than significant levels as detailed in Section 4.10, Hydrology and Water Quality.
40 DOC. California Geologic Survey. 2021. Earthquake Zones of Required Investigation. Website:
https://maps.conservation.ca.gov/cgs/EQZApp/app/ (accessed April 29, 2026). 41 California State Mining and Geology Board. 2014. Surface Mining Reclamation Act Regulations. California Code of Regulations, Title 14, Division 2, Chapter 8, Subchapter 1.

Page 250 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-107 Compliance with existing regulatory requirements would ensure that the Project would not result in substantial soil erosion or the loss of topsoil during construction and/or operation. Impacts would be less than significant.
c. Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Less Than Significant with Mitigation Incorporated. As discussed in Section 4.7.1.a, site soils would not be subject to landslides and impacts associated with liquefaction would be less than significant with the implementation of Mitigation Measure GEO-1. Impacts associated with lateral spreading, subsidence, and unstable soils and collapse are further discussed below.

Lateral Spreading. Lateral spreading is a form of horizontal displacement of soil toward an open channel or other “free” face, such as an excavation boundary. In a lateral spread failure, a layer of ground at the surface is carried on an underlying layer of liquefied material over a nearly flat surface toward a river channel or other bank. The lateral spreading hazard tends to mirror the liquefaction hazard for a site. As discussed above, the Project site and both pipeline alignments are on gently sloping San Ysidro sandy loam soils and does not include deep, loose, saturated sands typical of high liquefaction risk areas, although localized zones of loose near-surface soils may exist. Implementation of Mitigation Measure GEO‐1, which requires the Project applicant to complete a design-level geotechnical investigation once site development plans are final and incorporate all recommendations into the Project development plans, would reduce the potential impacts related to lateral spreading to a less than significant level with mitigation.

Subsidence. Subsidence can result from the removal of subsurface water resulting in either gradual depression or catastrophic collapse of the ground surface. Construction of the Project would require excavation to a maximum depth of 25 feet below ground surface. Dewatering and shoring of groundwater may be required during construction activities involving excavation because fluctuations in groundwater levels occur seasonally and over a period of years due to variations in precipitation, temperature, irrigation, and other factors. Any dewatering would be temporary and would affect only the uppermost water-bearing zone. Such dewatering would be localized and would not result in the lowering of surrounding groundwater levels. Therefore, the Project would result in less than significant impacts related to subsidence. d. Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less Than Significant with Mitigation Incorporated. Expansive soils are characterized by the potential for shrinking and swelling as the moisture content of the soil decreases and increases, respectively. Shrink-swell potential is influenced by the amount and type of clay minerals present and can be measured by the percentage change of the soil volume. As discussed above, soils at the Project predominantly consist of a sandy loam soil profile with minor clay inclusions. Due to the clay inclusions, soils on-site may be subject to expansion. However, compliance with the requirements of the CBSC and recommendations specified in the Geotechnical Review and Report as required by

Page 251 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -108 Mitigation Measure GEO-1 would ensure that potential risks to people and structures as a result of expansive soils would be reduced to a less than significant level with mitigation incorporated. e. Would the project have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water?
No Impact. Development of the Project would not involve the use of septic tanks or alternative wastewater disposal systems. Therefore, the Project would have no impact related to the soils capability to adequately support the use of septic tanks or alternative wastewater disposal systems. f. Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less Than Significant with Mitigation Incorporated. As discussed above in Section 4.7.1.6, the Project is in an area with low to moderate paleontological resource sensitivity, with low sensitivity in disturbed surficial soils and moderate potential for fossil-bearing deposits at depth within undisturbed older alluvial materials. Therefore, the possibility of accidental discovery of paleontological resources during Project construction cannot be discounted. Implementation of Mitigation Measure GEO-2, which requires the implementation of a paleontological resources impact mitigation program, would reduce potential impacts to paleontological resources to a less than significant level with mitigation incorporated.

4.7.4 Mitigation Measures
Mitigation Measure GEO-1 Design-Level Geotechnical Investigation. Prior to the start of construction, a licensed Geotechnical Engineer or their representative shall be retained to perform a design‐level geotechnical investigation once site development plans are final. The design‐level geotechnical investigation shall further evaluate the potential geologic hazards of the Project site, shall be used to address any identified geotechnical concerns, and shall develop detailed recommendations for Project design and construction. Any recommendations included in the design‐level geotechnical investigation for the Project shall be incorporated into all Project-related design and engineering plans. At the end of construction, the Geotechnical Engineer shall provide a letter confirming contractor compliance with Project plans and specifications and with the recommendations of the Geotechnical Investigation and any supplemental recommendations issued during construction. The letter shall be submitted to the City of Fairfield Building Division for review.

Mitigation Measure GEO-2 Paleontological Resources Impact Mitigation Program. Should paleontological resources be encountered during Project subsurface construction activities, all ground-disturbing activities within 25 feet shall be redirected and a qualified paleontologist contacted to

Page 252 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-109 assess the situation, consult with agencies as appropriate, and make recommendations for the treatment of the discovery. For purposes of this mitigation, a “qualified paleontologist” shall be an individual with the following qualifications: (1) a graduate degree in paleontology or geology and/or a person with a demonstrated publication record in peer-reviewed paleontological journals; (2) at least 2 years of professional experience related to paleontology; (3) proficiency in recognizing fossils in the field and determining their significance; (4) expertise in local geology, stratigraphy, and biostra-tigraphy; and (5) experience collecting vertebrate fossils in the field.

If the paleontological resources are found to be significant and Project activities cannot avoid them, the construction contractor shall implement measures to ensure that the Project does not cause a substantial adverse change in the significance of the paleontological resource. Measures will be determined by the qualified paleontologist and may include monitoring, recording the fossil locality, data recovery and analysis, a final report, and accessioning the fossil material and technical report to a paleontological repository. Upon completion of the assessment, a report documenting methods, findings, and recommendations shall be prepared and submitted to the City of Fairfield for review. If paleontological materials are recovered, this report also shall be submitted to a paleontological repository such as the University of California Museum of Paleontology, along with significant paleontological materials.

Page 253 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -110

4.8 GREENHOUSE GAS EMISSIONS
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the
environment?
b. Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?

4.8.1 Baseline Conditions

4.8.1.1 Background Information
Greenhouse gases (GHGs) are present in the atmosphere naturally, are released by natural sources, or are formed from secondary reactions taking place in the atmosphere. The gases that are widely seen as the principal contributors to human-induced global climate change are:
• Carbon dioxide (CO2)
• Methane (CH4)
• Nitrous oxide (N2O)
• Hydrofluorocarbons (HFCs)
• Perfluorocarbons (PFCs)
• Sulfur hexafluoride (SF6)
Over the last 200 years, humans have caused substantial quantities of GHGs to be released into the atmosphere. These extra emissions are increasing GHG concentrations in the atmosphere and enhancing the natural greenhouse effect, which is believed to be causing global warming. Although manmade GHGs include naturally occurring GHGs (e.g., CO2, CH4, and N2O), some gases (e.g., HFCs, PFCs, and SF6) are completely new to the atmosphere.

4.8.1.2 Existing Sources of Greenhouse Gas Emissions
Existing GHG emissions in the Project vicinity are generated primarily by vehicle travel, energy consumption, agricultural operations, industrial activities, and operation of public utility infrastructure. At the North Bay Regional Water Treatment Plant (NBRWTP), existing GHG emissions are associated with electricity consumption for water treatment and pumping operations, facility maintenance activities, employee commute trips, and occasional delivery and service vehicles.

The Linear Trail Pipeline Alignment traverses primarily open space, utility corridors, and existing infrastructure corridors. Existing GHG emissions along this alignment are associated primarily with regional transportation activity, agricultural operations, maintenance activities, and utility operations. The Peabody Road Pipeline Alignment is primarily within or adjacent to an existing

Page 254 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-111 roadway corridor where existing GHG emissions are generated by vehicle traffic, agricultural activities, utility operations, and nearby residential and commercial land uses.

The Project would expand and modernize an existing regional water treatment facility and construct a new treated-water transmission pipeline. As a result, future GHG emissions associated with the Project would be generated primarily through construction equipment operation, worker vehicle trips, material transport, electricity consumption, pumping operations, and facility maintenance activities.

4.8.1.3 Thresholds of Significance
According to the Bay Area Air District (Air District), a project would have a less than significant impact related to GHG emissions if it would:
a. Include, at a minimum, the following project design elements:

1. Buildings
a. The project will not include natural gas appliances or natural gas plumbing (in both residential and nonresidential development).
b. The project will not result in any wasteful, inefficient, or unnecessary electrical usage as determined by the analysis required under CEQA Section 21100(b)(3) and Section 15126.2(b) of the State CEQA Guidelines.

2. Transportation
a. Achieve a reduction in project-generated vehicle miles traveled (VMT) below the regional average consistent with the current version of the California Climate Change Scoping Plan (currently 15 percent) or meet a locally adopted Senate Bill 743 VMT target, reflecting the recommendations provided in the Governor’s Office of Planning and Research’s Technical Advisory on Evaluating Transportation Impacts in CEQA:

1. Residential projects: 15 percent below the existing VMT per capita

2. Office projects: 15 percent below the existing VMT per employee

3. Retail projects: no net increase in existing VMT
b. Achieve compliance with off-street electric vehicle requirements in the most recently adopted version of CALGreen Tier 2.
c. Or be consistent with a local GHG reduction strategy that meets the criteria under State CEQA Guidelines Section 15183.5(b).

Page 255 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -112 In December 2024, the City of Fairfield adopted a Climate Action Plan (CAP) that is qualified under CEQA Section 15183.5(b). 42 The City of Fairfield’s CAP meets the requirements for a Qualified Greenhouse Gas Reduction Strategy and is designed to streamline environmental review of future development projects in Fairfield. Therefore, consistent with Threshold Item B, the level of significance is determined by evaluating the Project for consistency with the City of Fairfield’s CAP. A consistency analysis with the CARB’s 2022 Scoping Plan is also provided.

Although a small portion of the Project site is within the City of Vacaville, the City of Fairfield is the lead agency and the Project is primarily within Fairfield. The City of Vacaville Energy and Conservation Action Strategy (ECAS) was reviewed, and no policies or measures were identified that are applicable to the proposed pipeline facilities. Therefore, a detailed consistency evaluation with the ECAS was not warranted.

In addition, the Air District guidance states that a project with stationary sources of emissions must fall below the bright-line threshold of 10,000 metric tons (MT) of carbon dioxide equivalent (CO2e) per year to have a less than significant impact related to stationary-source GHG emissions. 43 Therefore, total quantified operational emissions are compared to the 10,000 MT CO2e per year threshold.

4.8.2 Regulatory Requirements

4.8.2.1 Federal Regulations
United States Environmental Protection Agency. The United States has historically had a voluntary approach to reducing GHG emissions. However, on April 2, 2007, the United States Supreme Court ruled that the United States Environmental Protection Agency (EPA) has the authority to regulate CO2 emissions under the (Federal) Clean Air Act (CAA).

While there currently are no adopted federal regulations for the control or reduction of GHG emissions, the EPA commenced several actions in 2009 to implement a regulatory approach to global climate change, including the 2009 EPA final rule for mandatory reporting of GHGs from large GHG emission sources in the United States. Additionally, the USEPA Administrator signed an endangerment finding action in 2009 under the CAA, finding that seven GHGs (CO2, CH4, N2O, HFCs, nitrogen trifluoride [NF3], PFCs, and SF6) constitute a threat to public health and welfare, and that the combined emissions from motor vehicles cause and contribute to global climate change, leading to national GHG emission standards. The 2009 endangerment finding was repealed in early 2026.

4.8.2.2 State Regulations
California Air Resources Board. The California Air Resources Board (CARB) is the lead agency for implementing climate change regulations in the State. Since its formation, CARB has worked with 42 City of Fairfield. 2024. City of Fairfield Climate Action Plan. December. Website:
https://www.fairfield.ca.gov/home/showpublisheddocument/12085/638701095833270000 (accessed June 2026). 43 Bay Area Air District. 2022 CEQA Guidelines. Website: https://www.baaqmd.gov/ plans-and-climate/ california-environmental-quality-act-ceqa/updated-ceqa-guidelines (accessed September 2026).

Page 256 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-113 the public, the business sector, and local governments to find solutions to California’s air pollution problems. Key efforts by the State are described below.

Assembly Bill 32 (2006), California Global Warming Solutions Act. California’s major initiative for reducing GHG emissions is AB 32, passed by the State Legislature on August 31, 2006. This effort set a target to reduce GHG emissions to 1990 levels by 2020. CARB has established the level of GHG emissions in 1990 at 427 million metric tons of CO2e. AB 32 requires CARB to prepare a Scoping Plan that outlines the main State strategies for meeting the 2020 deadline and to reduce GHGs that contribute to global climate change.

Climate Change Scoping Plan. The initial Scoping Plan was adopted in 2008. The CARB approved the First Update to the Climate Change Scoping Plan on May 22, 2014. CARB released a second update to the Scoping Plan, the 2017 Scoping Plan, 44 to reflect the 2030 target that was set by EO B-30-15 and codified by Senate Bill (SB) 32. The current scoping plan, the 2022 Scoping Plan45 was approved in December 2022 and assesses progress toward the statutory 2030 target while laying out a path to achieving carbon neutrality no later than 2045. The 2022 Scoping Plan Update focuses on outcomes needed to achieve carbon neutrality by assessing paths for clean technology, energy deployment, natural and working lands, and others, and is designed to meet the State’s long-term climate objectives and support a range of economic, environmental, energy security, environmental justice, and public health priorities.

The 2022 Scoping Plan focuses on building clean energy production and distribution infrastructure for a carbon-neutral future, including transitioning existing energy production and transmission infrastructure to produce zero-carbon electricity and hydrogen, and utilizing biogas resulting from wildfire management or landfill and dairy operations, among other substitutes. The 2022 Scoping Plan states that in almost all sectors, electrification will play an important role. The 2022 Scoping Plan evaluates clean energy and technology options and the transition away from fossil fuels, including adding four times the solar and wind capacity by 2045 and about 1,700 times the amount of current hydrogen supply. As discussed in the 2022 Scoping Plan, EO N-79-20 requires that all new passenger vehicles sold in California be zero-emission by 2035 and that all other fleets transition to zero-emission as fully as possible by 2045, which will reduce the percentage of fossil fuel combustion vehicles.

Senate Bill 32, California Global Warming Solutions Act of 2016, and Assembly Bill 197. In summer 2016, the Legislature passed, and the Governor signed, SB 32 and AB 197. SB 32 affirms the importance of addressing climate change by codifying into statute the GHG emission reduction target of at least 40 percent below 1990 levels by 2030 contained in Governor Brown’s April 2015 EO B-30-15. SB 32 builds on AB 32 and keeps us on the path toward achieving the State’s 2050 objective of reducing emissions to 80 percent below 1990 levels, consistent with an Intergovernmental Panel on Climate Change analysis of the emission trajectory that would stabilize 44 CARB. 2017. California’s 2017 Climate Change Scoping Plan. November. 45 CARB. 2022. 2022 Scoping Plan Update. May 10. Website: https://ww2.arb.ca.gov/sites/default/files/ 2022-12/2022-sp.pdf (accessed June 2026).

Page 257 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -114 atmospheric GHG concentrations at 450 parts per million of CO2e and reduce the likelihood of catastrophic impacts from climate change.

AB 197, the companion bill to SB 32, provides additional direction to CARB related to the adoption of strategies to reduce GHG emissions. Additional direction in AB 197 meant to provide easier public access to air emissions data that are collected by CARB was posted in December 2016.

Assembly Bill 1279. AB 1279 was signed in September 2022 and codifies the State goals of achieving net carbon neutrality by 2045 and maintaining net negative GHG emissions thereafter. This bill also requires California to reduce statewide GHG emissions by 85 percent compared to 1990 levels by 2045 and directs CARB to work with relevant State agencies to achieve these goals.

4.8.2.3 Regional/Local Regulations
CEQA Guidelines. The Air District’s CEQA Guidelines 46 identify applicable GHG significance thresholds. The Air District recommends these thresholds of significance for use in determining whether a Project will have a significant impact related to climate change. These thresholds evaluate a project based on its effect on California’s efforts to meet the State’s long-term climate goals.

Applying this approach, the Air District identifies and provides supporting documentation outlining the requirements that new land use development projects must comply with to achieve California’s long-term climate goal of carbon neutrality by 2045. Based on this research, the Air District has determined that new land use development projects need to incorporate design elements to contribute the “fair share” toward implementation of the goal of carbon neutrality by 2045. If a project is designed and built to incorporate the identified design elements, it will contribute its portion of what is necessary to achieve California’s long-term climate goals—its “fair share”—and an agency reviewing the project under CEQA can conclude that the project will not make a cumulatively considerable contribution to global climate change.

City of Fairfield General Plan. The Sustainability Element of the City of Fairfield’s General Plan47 includes goals and policies related to GHG emissions and climate change vulnerability. The following policies may be applicable to the Project:
• Goal SUS-1. Strive to reduce greenhouse gas emissions to 40 percent below 1990 levels by 2030, and reach carbon neutrality by 2045, consistent with State law. ○ Policy SUS-1.1. Climate Action Plan (CAP). Use the CAP (concurrently adopted with the General Plan) as the primary tool for achieving the City’s GHG reduction targets. Monitor and periodically report on CAP implementation progress and update the CAP as necessary to make progress toward the City’s greenhouse gas reduction goals. 46 Bay Area Air District. 2022 CEQA Guidelines. Website: https://www.baaqmd.gov/ plans-and-climate/ california-environmental-quality-act-ceqa/updated-ceqa-guidelines (accessed June 2026). 47 City of Fairfield. 2024d. General Plan Documents. December. Website: https://www.fairfield.ca.gov/ government/city-departments/community-development/planning-division/general-plan/general-plan-documents (accessed June 2026).

Page 258 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-115 • Goal SUS-5. Coordinate with partners and the public to reduce energy consumption and promote energy conservation
○ Policy SUS-5.1. Electricity Provider Conservation Efforts. Support efforts that increase energy conservation in all households and businesses.

City of Fairfield Climate Action Plan. In December 2024, the City of Fairfield adopted a Climate Action Plan (CAP) that is qualified under CEQA Section 15183.5(b). 48 The CAP identifies several GHG reduction measures that, when implemented, would help the City achieve its GHG reduction targets.

The GHG reduction measures are divided into the following sectors: transportation; built environment; solid waste; wastewater; potable water; and carbon sequestration. The following measures may be applicable to the Project:
• Measure BE-3: Reduce energy demand and consumption through energy efficiency and conservation.
• Measure SW-1: Reduce the amount of solid waste that is generated and sent to landfills, especially organic waste.
o Supporting Action SW-1E: Construction and Demolition Waste • Measure PW-1: Reduce water utility emissions by 60% below 2020 levels by 2030 and 100% by 2050.
o Supporting Action PW-1A: Landscape Efficiency
o Supporting Action PW-1B: Water Conservation Ordinance o Supporting Action PW-1C: Recycled Water Program
o Supporting Action PW-1D: Education and Incentives
City of Fairfield Municipal Code. Chapter 5, City of Fairfield Building and Housing Code, of the City’s Municipal Code adopts the 2025 California Building Standards Code, including Title 24 and the California Green Building Standards Code.

City of Vacaville General Plan. The Conservation and Open Space Element of the City of Vacaville General Plan includes goals and policies that relate to GHG emissions. In addition, the Safety Element of the City of Vacaville General Plan includes goals and policies that relate to climate change. The following policies may be applicable to the Project: 49 • Goal COS-9. Reduce greenhouse gas emissions and improve the sustainability of actions by City government, residents, and businesses in Vacaville.
48 City of Fairfield. 2024f. City of Fairfield Climate Action Plan. December. Website:
https://www.fairfield.ca.gov/home/showpublisheddocument/12085/638701095833270000 (accessed June 2026). 49 City of Vacaville. 2015. Vacaville General Plan. Website: https://www.cityofvacaville.gov/home/ showpublisheddocument/14102/637045896849400000 (accessed June 2026).

Page 259 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -116 ○ Policy COS-P9.8. Promote green building practices in new development.

City of Vacaville Energy and Conservation Action Strategy. In 2015, the City of Vacaville adopted the Energy and Conservation Action Strategy (ECAS), which meets the requirements of a qualified CAP under CEQA Section 15183.5(b). The ECAS establishes a strategy to reduce GHG emissions and achieve greater conservation of resources with regards to transportation and land use, energy, water, solid waste, and open space. The ECAS includes communitywide measures, which aim to reduce GHG emissions from activities that take place within the City, and municipal measures, which apply exclusively to City government operations. 50 There are not measures in the ECAS that are applicable to the portion of the proposed project that takes place within City of Vacaville limits, which is limited to an underground pipeline connection.

4.8.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. This analysis considers the longer pipeline alignment as the more conservative scenario. If the shorter pipeline alignment is ultimately selected, emissions will be less than what is presented herein.
a. Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less Than Significant Impact. The Project would generate construction- and operation-related GHG emissions and contribution to global climate change. The Air District has not addressed emissions thresholds for construction in its CEQA Guidelines; however, construction emissions are discussed in this section for disclosure purposes.

Construction Greenhouse Gas Emissions. Construction activities associated with the Project would produce combustion emissions from various sources. During construction, GHGs would be emitted through the operation of construction equipment and from worker and builder supply vendor vehicles, each of which typically use fossil-based fuels to operate. The combustion of fossil-based fuels creates GHGs such as CO2, CH4, and N2O. Furthermore, CH4 is emitted during the fueling of heavy equipment. Exhaust emissions from on-site construction activities would vary daily as construction activity levels change.

The Air District does not have an adopted threshold of significance for construction-related GHG emissions. However, lead agencies are encouraged to quantify and disclose GHG emissions that would occur during construction. Using CalEEMod (Appendix A), it was estimated that construction of the Project would generate approximately 5,858.5 metric tons of CO2e. 50 City of Vacaville. 2015. City of Vacaville Energy and Conservation Action Strategy. Website:
https://www.cityofvacaville.gov/home/showpublisheddocument/5454/636234161698230000 (accessed June 2026).

Page 260 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-117 Operational Greenhouse Gas Emissions. Long-term GHG emissions associated with the Project would typically be generated from mobile sources (e.g., vehicle trips), area sources (e.g., maintenance activities and landscaping), indirect emissions from sources associated with energy consumption, waste sources (land filling and waste disposal), and water sources (water supply and conveyance, treatment, and distribution). Mobile-source GHG emissions would include Project-generated vehicle trips to and from the Project site. Area-source emissions would be associated with activities such as landscaping and maintenance on the Project site. Energy-source emissions would be generated at off-site utility providers as a result of increased electricity demand generated by the Project. Waste-source emissions generated by the Project include energy generated by land filling and other methods of disposal related to transporting and managing Project-generated waste. In addition, water-source emissions associated with the Project are generated by water supply and conveyance, water treatment, water distribution, and wastewater treatment. Stationary-source emissions associated with diesel-fueled emergency generators proposed as part of the onsite microgrid were included in the operational emissions analysis.

Project GHG emissions were estimated using CalEEMod and are presented in Table 4.8.A below for disclosure purposes.

Table 4.8.A: Operational Greenhouse Gas Emissions
Emissions Source Operational Emissions (MT CO2e/yr)
Mobile 31.4
Area 0.1
Energy 102.7
Water 4.8
Waste 3.8
Off-Road 0.0
Stationary 68.8
Total Project Operational Emissions 211.5
Air District Bright-Line Threshold 10,000
Exceeds Threshold? No
Source: Compiled by LSA (September 2026).

CO2e = carbon dioxide equivalent
MT/yr = metric tons per year
As presented in Table 4.8.A, Project emissions, including those estimated for stationary sources, would be well below the 10,000 MT CO2e per year bright-line threshold applicable to stationary-source projects. Therefore, the Project would not result in a significant impact related to stationary-source GHG emissions.

In addition to evaluating the Project’s GHG emissions against the applicable stationary-source significance threshold, the Project's consistency with the City’s CAP was evaluated. As described above, the City’s CAP meets the Air District requirements for a Qualified GHG Reduction Strategy and is designed to streamline environmental review of future development projects in the City consistent with State CEQA Guidelines Section 15183.5(b) and the Air District CEQA Air Quality

Page 261 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -118 Guidelines. 51 The City’s CAP sets forth a menu of strategies to achieve GHG emission reductions; therefore, a qualitative analysis of the Project’s consistency with these policies and strategies is provided. These policies and other strategies include measures in transportation, land use, building energy, water, waste, and green infrastructure. The Project consists of improvements and expansion of an existing potable water treatment facility and associated transmission pipeline infrastructure.

Given the nature of the proposed, many of the CAP strategies are not applicable. The following measures and supporting actions are applicable to the Project:
• Measure BE-3: Reduce energy demand and consumption through energy efficiency and conservation.
• Measure SW-1: Reduce the amount of solid waste that is generated and sent to landfills, especially organic waste.
○ Supporting Action SW-1E: Construction and Demolition Waste • Measure PW-1: Reduce water utility emissions by 60% below 2020 levels by 2030 and 100% by 2050.
○ Supporting Action PW-1A: Landscape Efficiency
○ Supporting Action PW-1B: Water Conservation Ordinance ○ Supporting Action PW-1C: Recycled Water Program
○ Supporting Action PW-1D: Education and Incentives
The Project would also be consistent with Measure BE-3 by directly improving energy efficiency of treatment operations. Construction of the Project would be consistent with Measure SW-1 and Supporting Action SW-1E because construction activities would implement standard construction and demolition debris management practices, including recycling and diversion of materials to the extent feasible. The Project would be consistent with Measure PW-1 and its supporting actions (PW-1A through PW-1D) by modernizing and expanding existing potable water treatment infrastructure in a manner that improves operational efficiency and reliability. While the Project would increase overall treatment capacity, it would incorporate updated treatment processes, pumps, and associated equipment designed to improve energy efficiency relative to existing conditions, thereby reducing energy consumption per unit of water treated. Furthermore, implementation of the Project would not conflict with other CAP sectors, including transportation (TR-1 through TR-3), wastewater (WW-1), or carbon sequestration (CS-1), as it would not notably affect regional transportation patterns, wastewater treatment operations, or carbon sequestration programs.

Therefore, the Project would be consistent with the applicable GHG reduction strategies from the City’s qualified CAP. As a result, the Project would not generate GHG emissions that may have a significant impact on the environment, and the impact is less than significant. 51 City of Fairfield. 2024f. City of Fairfield Climate Action Plan. December. Website:
https://www.fairfield.ca.gov/home/showpublisheddocument/12085/638701095833270000 (accessed June 2026).

Page 262 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-119 b. Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less Than Significant Impact. Relevant GHG reduction plans include the City’s CAP and the CARB’s 2022 Scoping Plan. 52 As discussed above, the Project was determined to be consistent with the City’s CAP, which is a qualified GHG reduction strategy under State CEQA Guidelines Section 15183.5(b). The following discussion evaluates the Project for consistency with the goals of the 2022 Scoping Plan.

The 2022 Scoping Plan establishes a plan to achieve the state’s climate goals established by AB 32, SB 32, and AB 1279. The 2022 Scoping Plan focuses on outcomes needed to achieve carbon neutrality by assessing paths for clean technology, energy deployment, natural and working lands, and others, and is designed to meet the State’s long-term climate objectives and support a range of economic, environmental, energy security, environmental justice, and public health priorities. The Project consists of the expansion and modernization of an existing potable water treatment facility and associated infrastructure and would incorporate energy-efficient equipment and operational improvements that reduce energy use per unit of water treated compared to existing conditions.

As a utility infrastructure Project, the Project supports planned General Plan buildout and does not induce growth beyond that already assumed in adopted planning documents. Furthermore, the Project would not substantially increase vehicle miles traveled and would be subject to applicable Air District permitting requirements for any new stationary equipment. Therefore, the Project would be consistent with the overarching objectives set forth in the 2022 Scoping Plan, and would not conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing GHG emissions. The impact would be less than significant.

4.8.4 Mitigation Measures
No mitigation measures are warranted.
52 California Air Resources Board (CARB). 2022. 2022 Scoping Plan for Achieving Carbon Neutrality.

November 16. Website: https://ww2.arb.ca.gov/sites/default/files/2022-12/2022-sp_1.pdf (accessed June 2026).

Page 263 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -120

4.9 HAZARDS AND HAZARDOUS MATERIALS
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident
conditions involving the release of hazardous materials into the environment?
c. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? d. Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code
Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
e. For a project located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
f. Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
g. Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?

4.9.1 Baseline Conditions

4.9.1.1 Hazardous Materials
The North Bay Regional Water Treatment Plant (NBRWTP) is an established public utility facility that handles chemicals and materials commonly associated with large-scale potable water treatment operations. Typical materials stored and used on-site include aluminum sulfate (alum), sodium hypochlorite, polymer coagulants, lime, and other treatment-related chemicals. These materials are stored in designated containment areas designed to meet secondary containment and spill prevention requirements. The facility follows standard hazardous material management practices consistent with its operational permits and regulatory obligations under the California Health and Safety Code, Title 22 of the California Code of Regulations (CCR), and Occupational Safety and Health Administration (OSHA) standards. The NBRWTP maintains a current Hazardous Materials Business Plan (HMBP) on file with the Solano County Department of Resource Management, which includes information on material storage, emergency procedures, and employee training.

Page 264 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-121

4.9.1.2 Hazardous Waste
Routine operations at the NBRWTP generate limited quantities of hazardous waste, including used oil, chemical containers, laboratory reagents, and spent process materials. These wastes are properly characterized, labeled, and stored in compliance with Title 22 CCR hazardous waste management standards. The NBRWTP is classified as a small-quantity generator and uses licensed hazardous waste haulers for off-site disposal at permitted treatment, storage, and disposal facilities.

Given the ongoing compliance with hazardous waste handling and disposal regulations, existing conditions reflect a well-managed industrial facility with established controls and limited potential for improper waste management.

4.9.1.3 Hazardous Materials Transport
Chemical deliveries to the NBRWTP occur periodically via tanker trucks and other commercial vehicles using designated regional transportation routes, including Peabody Road and connecting arterials that access Interstate 80. Transport of hazardous materials is regulated by the United States Department of Transportation (USDOT) and the California Highway Patrol (CHP) under Title 49 Code of Federal Regulations (CFR) and Title 13 CCR, respectively. Existing baseline conditions include routine but controlled hazardous materials transport to and from the facility under well-established safety protocols, with no recorded incidents or violations associated with the NBRWTP.

4.9.1.4 Hazardous Materials Sites
A review of the California Department of Toxic Substances Control (DTSC) EnviroStor and State Water Resources Control Board (SWRCB) GeoTracker databases indicates that the Project is not listed as a hazardous material release site or cleanup location. Although the Project is not identified as a known hazardous material release site, there is potential for soil contamination to occur within portions of the overall Project area, particularly along the Peabody Road Pipeline Alignment.

Previous construction projects in the vicinity of the southern portion of the Peabody Road corridor have documented the presence of creosote and/or arsenic impacted soils associated with historic railroad-related activities and/or legacy infrastructure uses, as confirmed by City of Fairfield staff and prior environmental investigations. As a result, construction activities along the Peabody Road Pipeline Alignment could encounter contaminated soil during trenching and excavation activities.

Unlike the Peabody Road Pipeline Alignment, no known hazardous or contaminated soils have been identified along the Linear Trail alignment based on available environmental records.

4.9.1.5 Sensitive Receptors
Sensitive receptors near the Project area include nearby residential neighborhoods to the east (One Lake community) and to the west across Peabody Road, as well as schools and recreational areas farther from the facility. The immediate vicinity of the NBRWTP, however, is primarily characterized by open space, utility corridors, and service-industrial land uses that provide spatial buffering. Given the industrial nature of the existing facility and the lack of sensitive receptors in its immediate proximity, baseline exposure potential to hazardous materials is considered low.

Page 265 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -122

4.9.1.6 Airport Hazards
The Project site is approximately 3 miles northeast of Travis Air Force Base, within the general influence area but outside of the designated safety zones and flight paths defined in the Travis Air Force Base Land Use Compatibility Plan (LUCP). The NBRWTP is not subject to airport height restrictions or significant overflight exposure. Existing baseline conditions therefore do not present elevated risks related to aircraft operations or airport hazards.

4.9.1.7 Emergency Management and Response
The City of Fairfield’s Emergency Operations Plan53 and Solano County’s Hazard Mitigation Plan54 establish protocols for coordinated emergency response, including hazardous materials incidents, spills, and natural disasters. The NBRWTP maintains its own emergency response and notification procedures as part of its HMBP, including coordination with the Fairfield Fire Department, which provides hazardous material response services. The site has adequate access for emergency vehicles via Waterworks Lane and Peabody Road, and the facility is equipped with emergency shutoff systems, containment structures, and communication protocols. Baseline emergency preparedness is therefore considered robust and compliant with local and State requirements.

4.9.1.8 Wildland Fires
The Project is in a largely developed and managed setting near the urban edge of Fairfield and is not within a State-designated Very High Fire Hazard Severity Zone, according to CAL FIRE mapping. 55 The surrounding open space areas consist primarily of managed grasslands and low-growing vegetation, with limited fuel loads and minimal topographic relief. Given the maintained conditions and distance from forested lands, the baseline condition reflects a low wildland fire hazard potential.

4.9.2 Regulatory Requirements

4.9.2.1 Federal Regulations
Federal Emergency Management Agency. With respect to emergency planning, the Federal Emergency Management Agency is responsible for ensuring the establishment and development of policies and programs for emergency management at the federal, State, and local levels.

Enforcement of these laws and regulations is delegated to State and local environmental regulatory agencies.
53 City of Fairfield. 2022. Emergency Operations Plan. Website: https://www.fairfield.ca.gov/home/ showpublisheddocument/9947/638356466726400000 (accessed May 6, 2026). 54 Solano County Office of Emergency Services. 2022. Multi-Jurisdictional Hazard Mitigation Plan. Website:
https://www.solanocounty.gov/archival-document?document=https://content.solanocounty.gov/sites/ default/files/2025-05/Solano-MJHMP-VOL-1-FEMA_Approval_and_Adoptions_0.pdf&ad=aHR0cHM6 Ly9jb250ZW50LnNvbGFub2NvdW50eS5nb3Yvc2l0ZXMvZGVmYXVsdC9maWxlcy8yMDI1LTA1L1NvbGFuby 1NSkhNUC1WT0wtMS1GRU1BX0FwcHJvdmFsX2FuZF9BZG9wdGlvbnNfMC5wZGY=&title=Solano%20MJH MP:%20Volume%20I (accessed May 6, 2026). 55 CAL FIRE. 2026b. Fire Hazard Severity Zones. Website: https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/fire-hazard-severity-zones (accessed May 6, 2026).

Page 266 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-123 Resource Conservation and Recovery Act. The Resource Conservation and Recovery Act (RCRA) Subtitle C addresses hazardous waste generation, handling, transportation, storage, treatment, and disposal. It includes requirements for a system that uses hazardous waste manifests to track the movement of waste from its site of generation to its ultimate disposition. The 1984 amendments to the RCRA created a national priority for waste minimization. Subtitle D establishes national minimum requirements for solid waste disposal sites and practices. It requires states to develop plans for the management of wastes within their jurisdictions. Subtitle I requires monitoring and containment systems for underground storage tanks that hold hazardous materials. Owners of tanks must demonstrate financial assurance for the cleanup of a potential leaking tank.

United States Department of Transportation Regulations, Title 49 Code of Federal Regulations (Hazardous Materials Transportation Act). The Hazardous Materials Transportation Act is the statutory basis for the extensive body of regulations aimed at ensuring the safe transport of hazardous materials on water, rail, highways, in the sky, or in pipelines. It includes provisions for materials classification, packaging, marking, labeling, placarding, and shipping documentation.

Occupational Safety and Health Administration, Title 29 CFR. OSHA is the federal agency responsible for ensuring workplace safety and health under the authority of the Occupational Safety and Health Act of 1970. OSHA regulations, codified in Title 29 of the CFR, establish comprehensive standards for safe work environments and procedures across a wide range of industries. These standards include requirements for the storage, handling, labeling, and transportation of hazardous materials; worker training; use of personal protective equipment; and emergency response procedures. OSHA’s Hazard Communication Standard (29 CFR 1910.1200) requires employers to inform and train employees about the hazardous substances to which they may be exposed.

Additionally, the Hazardous Waste Operations and Emergency Response standard (29 CFR 1910.120) prescribes specific safety and health requirements for employees engaged in hazardous waste operations and emergency response activities. Compliance with OSHA regulations is mandatory for all public and private sector employers, ensuring that construction and operation of the Project are conducted in a manner protective of worker health and safety.

Toxic Substances Control Act. The Toxic Substances Control Act (TSCA), codified under Title 15 United States Code Sections 2601–2692 and implemented through Title 40 CFR Parts 700–799, authorizes the United States Environmental Protection Agency (EPA) to regulate the manufacture, importation, processing, distribution, use, and disposal of chemical substances and mixtures that may present an unreasonable risk to human health or the environment. The TSCA establishes requirements for chemical testing, reporting, recordkeeping, and restrictions related to chemical substances already in commerce, as well as new chemical substances prior to manufacture. Under the TSCA framework, USEPA maintains the TSCA Chemical Substance Inventory and has authority to require manufacturers to submit data on chemical toxicity, exposure potential, and environmental fate.Specific regulatory provisions under TSCA include the prohibition or control of hazardous substances such as polychlorinated biphenyls (PCBs), asbestos-containing materials, and lead-based paint. The TSCA also includes risk management actions to phase out or restrict the use of persistent, bioaccumulative, and toxic chemicals and mandates evaluation of existing chemicals to determine potential risks. Compliance with TSCA regulations ensures that construction and operation of

Page 267 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -124 projects involving hazardous materials are conducted in a manner that protects workers, the public, and the environment from chemical hazards.

The Clean Water Act. The Clean Water Act (CWA) is the primary federal law governing water pollution control in the United States. Its objective is to restore and maintain the chemical, physical, and biological integrity of the nation’s waters. Under Section 402 of the CWA, the National Pollutant Discharge Elimination System (NPDES) program regulates point source discharges of pollutants to surface waters, including those associated with construction activities and municipal stormwater systems. The EPA has delegated NPDES permitting authority in California to the SWRCB and its Regional Water Quality Control Boards (RWQCBs).

Section 402(p) specifically addresses stormwater discharges associated with industrial and construction activities, requiring operators to obtain NPDES permit coverage and implement best management practices (BMPs) to control pollutant discharges. The permits establish effluent limitations, monitoring requirements, and stormwater management measures designed to prevent contamination of surface waters and groundwater by hazardous materials, sediments, and other pollutants. Compliance with the NPDES Construction General Permit (Order No. 2022-0057-DWQ, NPDES No. CAS000002) and the Municipal Regional Stormwater Permit (Order No. R2-2022-0018, NPDES No. CAS612008) ensures that the Phase 2 RWMP and its future project components protect water quality during both construction and operational phases, consistent with federal and state regulatory standards.

Safe Drinking Water Act (SDWA) (42 United States Code Section 300(f) et seq.). The SDWA is the principal federal law enacted to ensure the quality and safety of the nation’s public drinking water supplies. Administered by the USEPA, the SDWA authorizes the establishment of national health-based standards for drinking water to protect against both naturally occurring and manmade contaminants. These standards apply to all public water systems in the United States and set maximum contaminant levels for a variety of substances, including heavy metals, organic chemicals, and microbial pathogens.

Wildland-Urban Interface Code. Section 202 of the International Code Council establishes a Wildland-Urban Interface (WUI) and requires projects within WUI areas to develop project-specific Fire Protection Plans that describe ways to minimize and mitigate the fire problems created by the project or development, with the purpose of reducing impacts on the community’s fire protection delivery system.

4.9.2.2 State Regulations
California Code of Regulations. Most State and federal regulations and requirements that apply to generators of hazardous waste are spelled out in the CCR. Title 22, Division 4.5. Title 22 contains the detailed compliance requirements for hazardous waste generators, transporters, treatment, storage, and disposal facilities. Because California is a fully authorized State according to the RCRA, most RCRA regulations (those contained in 40 CFR 260, et seq.) have been duplicated and integrated into Title 22. However, because the DTSC regulates hazardous waste more stringently than the EPA, the integration of California and federal hazardous waste regulations that make up Title 22 do not contain as many exemptions or exclusions as does 40 CFR 260. As with the California Health and

Page 268 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-125 Safety Code, Title 22 also regulates a wider range of waste types and waste management activities than do the RCRA regulations in 40 CFR 260. To aid the regulated community, California has compiled the hazardous material, waste and toxics-related regulations contained in CCR, Titles 3, 8, 13, 17, 19, 22, 23, 24, and 27 into one consolidated CCR, Title 26 “Toxics.” However, the California hazardous waste regulations are still commonly referred to as Title 22. For the purposes of clarity, because of the extensive reach of Title 22 and Title 26, many common household products sold in grocery stores and home improvement warehouses qualify as hazardous materials. These items include household cleaners, detergents, paint, motor oil, lubricants, glues, pesticides, etc. The term “hazardous materials” is also defined to include many on-site materials as well, such as lubricants, fuel, etc. Thus, when this section of the Draft EIR discusses the transport and storage of “hazardous materials,” it is referring to the potential transport of bulk products to the project locations and to the temporary storage of such materials at the Project sites prior to their re-packaging and transport to subsequent destinations.

California Water Code, Division 7, Chapter 7 (Water Recycling Law). The Water Recycling Law establishes California’s policy to promote the safe and beneficial use of recycled water to augment existing water supplies and reduce reliance on imported freshwater. The law encourages local agencies to develop and operate water recycling programs that provide a reliable, sustainable, and environmentally responsible alternative water source. Under this law, recycled water must meet treatment and quality standards established by the California Department of Public Health (Title 22, CCR) to protect public health and the environment. The Water Recycling Law ensures that recycled water distribution, storage, and application are conducted safely, efficiently, and in a manner consistent with State policy objectives to conserve potable water and support sustainable water management.

California State Hazard Mitigation Plan. The purpose of the State Hazard Mitigation Plan (SHMP) is to significantly reduce deaths, injuries, and other losses attributed to natural and human-caused hazards in California. The SHMP provides guidance for hazard mitigation activities emphasizing partnerships among local, State, and federal agencies as well as the private sector.

Cortese List: Section 65962.5(a). Government Code Section 65962.5 requires the California Environmental Protection Agency (CalEPA) to develop at least annually an updated Hazardous Waste and Substances Sites list (Cortese List). The Cortese List is a planning document used by the State, local agencies, and developers to comply with CEQA requirements in providing information about the locations of hazardous materials release sites. Release sites or hazardous materials release sites may include:
• All hazardous waste facilities subject to corrective action pursuant to Section 25187.5 of the Health and Safety Code
• All land designated as hazardous waste property or border zone property pursuant to Article 11 (commencing with Section 25220) of Chapter 6.5 of Division 20 of the Health and Safety Code • All information received by the Department of Toxic Substances Control pursuant to Section 25242 of the Health and Safety Code on hazardous waste disposals on public land